Agenda Document Pack - Finance and Resources Committee - 22/05/2024

North Lanarkshire Council · 22 May 2024
Back to Finance and Resources Committee — 22 May 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

13 May 2024 
Members of the 
Finance and Resources Committee
Chief Executive’s Office
Archie Aitken
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk 
Notice is given that a Meeting of the Finance and Resources Committee is to be held in
the Council Chamber, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on
Wednesday, 22 May 2024 at 10:00 AM which you are requested to attend. 
The agenda of business is attached. 
Archie Aitken
Chief Officer (Legal & Democratic) 
Members : 
Clerk Name: Lesley Dysart
Clerk Telephone: 
Clerk Email: dysartl@northlan.gov.uk 
T Fisher, A Duffy-Lawson, C Barclay, A Beveridge, M Boyd, G Brennan, A Bustard, T
Carragher, C Costello, S Coyle, D Crichton, G Currie, K Duffy, H Dunbar, J Hume, L Jarvie,
D Johnston, T Johnston, J Jones, P Kelly, K Larson, G Lennon, J Logue, H Loughran, F
MacGregor, A Masterton, M McBride, P McDade, R McKendrick, J McLaren, M McPake, L
Nolan, P Patton, L Roarty, D Robb, G Robinson, R Sullivan, A Thomas, S Watson, G
Woods.  
Page 1 of 142

Page 2

Page 2 of 142

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical
Standards In Public Life Etc. (Scotland) Act 2000   
2 Finance and Resources Terms of Reference
Submit a copy of the remit/delegated function of the
Panel following agreement of the Policy and Strategy
Committee on 7 December 2023 
7 - 10 
3 Minute of the Joint Consultative Committee for
Local Government Employees of 19 March 24
Submit Minute of the Meeting of the Joint Consultative
Committee for Local Government Employees of 19
March 2024 
11 - 12  
Operational   
4 Amendment to Byelaws on the Employment of
Children
Submit report by the Chief Officer (Education
North) Submit seeking approval to amend the byelaws
to permit the employment of secondary school children
on a school day that falls on a Friday for up to four
hours instead of the current two hours 
13 - 22 
5 Registration Services
Submit report by the Chief Officer (Legal and
Democratic) providing (1) details of the performance of
North Lanarkshire Council's Registration in 2021 and
2022, and (2) an update on current and future
operations 
23 - 28  
Performance   
6 North Lanarkshire Properties LLP Performance
Indicators 4 August 2023 to 31 March 2024 &
Financial Performance as at 5 January 2024
Submit report by the Chief Officer (Assets and
Procurement) providing (1) details of North Lanarkshire
Properties LLP’s (NLP LLP) performance from 4th
August 2023 to 31 March 2024, and (2) an update on
significant events and service delivery highlights during
the reporting period 
29 - 44
Page 3 of 142

Page 4

7  Revenues and Benefits Update
Submit report by the Chief Officer (Finance) providing
an update on the performance within the Revenues
and Benefits functions of Finance as at 31 March 2024 
45 - 52 
8 Treasury Management Monitoring Report for
quarter ended 31 March 2024
Submit report by the Chief Officer (Finance) providing
Committee with the Treasury Management Activity for
the quarter ended 31 March 2024 including the
performance against the key treasury and prudential
indicators 
53 - 68 
9 Revenue Monitoring Reports   
9(a)  Revenue Budget Monitoring Report - Chief
Executive's Service 1 April 2023 to 1 March 2024
(Period 12)
Submit report by the Chief Officer (Finance) providing a
summary of the Chief Executive’s Service financial
performance for the Period from 1 April 2023 to 1
March 2024 (Period 12) 
69 - 80 
9(b)  Revenue Monitoring Report Council Summary 1
April 2023 to 1 March 2024
Submit report by the Chief Officer (Finance) providing
an update on the overall financial position for the
General Fund Account, Housing Revenue Account and
Adult Health and Social Care, for the financial year to
31 March 2024 
81 - 92 
10  Capital Monitoring Reports   
10(a)  Chief Executive's Service - Capital Monitoring
Report 1 April 2023 to 1 March 2024 (Period 12)
Submit report by the Chief Officer (Finance)
highlighting the financial performance and projected
outturn of 2023/24 Chief Executive capital programme
for the period ended  1 March 2024 (Period 12) 
93 - 100 
10(b)  Capital Programme 2023 24 Monitoring Report
Submit report by the Chief Officer (Finance) providing
an update on the 2023/24 resources and expenditure
for the Council's Strategic Capital Investment
Programme 
101 - 112
Page 4 of 142

Page 5

Contracts   
11  Contract Award for Provision of Merchant Aquiring
Services 2024-25
Submit report by the Chief Officer (Finance) seeking
homologation of the decision to award the contract for
provision of Merchant Acquiring Services 2024-25 to
Lloyds Bank Cardnet 
113 - 120 
12  Contract Award for Supply and Distribution of
Groceries and Provisions 2024-2026
Submit report by the Chief Officer (Community
Operations) seeking approval to award the contract for
Supply & Distribution of Groceries and Provisions 2024
– 2026 to Brake Bros Limited 
121 - 130 
13  Contracts with Variations
Submit report by the notifying the Committee of
contracts completed between 1st October 2023 and
31st March 2024, where the expenditure levels have
exceeded the contract award levels by greater than 5%
or £25,000 
131 - 138 
14  Contract Award Report Below Committee Approval
Threshold
Submit report by the Chief Officer (Assets and
Procurement) presenting details of a contract awarded
since the last committee which is below the threshold
requiring Committee approval 
139 - 142  
EXCLUSION OF PUBLIC
The Committee is asked to consider passing the
following resolution: "That under Section 50A(4) of the
Local Government (Scotland) Act 1973, the public be
excluded from the meeting for the following item of
business on the grounds that it involves the likely
disclosure of exempt information as defined in
paragraph 9 of Part 1 of Schedule 7A of the Act". 
15  Disposal of Pavilion, Sports Pitches and Ancillary
Ground at Deerdykes Place, Cumbernauld
Submit report by the Chief Officer (Assets and
Procurement) seeking consent to sell the site of the
former pavilion, sports pitch and ancillary land at
Deerdykes Place, Cumbernauld to the highest bidder 
Page 5 of 142

Page 6

Page 6 of 142

Page 7

FINANCE AND RESOURCES COMMITTEE 
(1) To plan, set targets for, and monitor the performance of all services within the remit of
this Committee. 
(2) Without prejudice to the duties and responsibilities of the Service Committees, to review
the effectiveness of the whole work of the Council and the standards and levels of service
provided, to identify the need for new services and to keep under review the necessity for
existing services. 
(3) To consider, whether following reference by another Committee or otherwise, new
policies or changes in policy which may have significant impact on the resources of the
Council. 
(4) To advise the Council on the allocation and oversight of its financial, personnel and land
resources. 
(5) To ensure that the organisation and management processes of the Council are designed
to make the most effective contribution to the achievement of the Council's objectives and,
to that end, to keep such organisation and management processes under review in light
of changing circumstances, making recommendations, as necessary, for change in either
the Committee or service structures and in the distribution of functions and
responsibilities. 
(6) To advise the Council generally as to its financial and economic policies and as to the
allocation and oversight of its financial resources and, in particular, to consider and make
recommendations to the Council on:- 
(a) the   annual   estimates   of   revenue   expenditure and estimates of capital
expenditure of all Committees; 
(b) all proposals relating to the setting of the Council Tax; 
(c) the determination of requests to incur expenditure not provided for in the
approved Capital Estimates, and 
(d) matters relating to local finance and taxation including the determination of
amounts due for the purpose of the Council Tax. 
(7) * To oversee arrangements made to secure that the functions of the Council are carried
out with due regard to the need to meet the requirements of the law for the time being
related to equalities and equal opportunities and to advise the Council generally on its
policies with regard thereto so as to promote equality of opportunity among the residents
of North Lanarkshire and users of the Council’s services. 
(8) To deal with any matters contained within the Terms of Reference of any Sub-Committee
of the Finance and Resources Committee. 
(9) To advise the Council on all matters relating to Finance and Local Taxation. 
(10) To make and supervise arrangements for the proper administration of the Council's
financial affairs. 
(11) To exercise such other functions in relation to matters of finance or local taxation as are
imposed on the Council by any Enactment or Statutory Order. 
(12) To be responsible for:- 
(a) supervision of the recovery of monies due to the Council;
Item 2
Page 7 of 142

Page 8

(b) all accounting and audit arrangements; 
(c) all insurance arrangements, and 
(d) all questions relating to loans or guarantees. 
(13) To write off accounts due to the Council. 
(14) To oversee co-ordination of financial provision for the undertaking of Council activities and
projects, including the securing of expenditure consents. 
(15) In terms of the Council's Financial Regulations to consider and determine requests to
incur expenditure not provided for in the approved Revenue Estimates. 
(16) In terms of the Council's Financial Regulations to consider and determine requests for
income or expenditure virement. 
(17) To monitor the capital and revenue budgets of the Council and all expenditure incurred
by the Council. 
(18) To monitor and approve expenditure falling within the remit of this Committee consistent
with approved Council objectives. 
(19) To oversee and allocate Trust Funds within the responsibility of the Council other than
Educational Endowments or any Trust appropriate to another Committee. 
(20) To write off deficiencies or bring into charge surplus stocks and stores held in any
service. 
(21) To oversee the operation of the Revenues function of the Council. 
(22) To consider reports summarising the financial position of revenue budgets under the
direct oversight of other Committees of the Council. 
(23) To consider monitoring reports in respect of the composite capital programme. 
(24) To formulate recommendations in relation to the operation of a housing benefit system in
terms of appropriate legislation. 
(25) To exercise the whole functions and powers of the Council as the Authority responsible
for licensing, registration and the determination of applications for permits and
permissions except to the extent that such functions and powers are expressly within
the Terms of Reference of another Committee or are the responsibility of the Licensing
Board. 
(26) * To make and review bye-laws and, except insofar as expressly contained within the
Terms of Reference of another Committee, management rules and to promote and
oppose private legislation. 
(27) To consider arrangements in relation to public and statutory holidays. 
(28) * To consider provisions contained in Bills, Acts and provisional Orders affecting the
interests of the Council and to promote or oppose provisional Orders etc. in the interests
of the Council but only in so far as such Bills, Acts or provisional Orders are not specifically
and solely appropriate for consideration by another Committee.
Page 8 of 142

Page 9

(29) To discharge the functions of the Council in relation to staffing, accommodation and
associated matters under the legislation relating to the jurisdiction of the Licensing Boards. 
(30) To oversee arrangements for the provision of resources for Members whether by way of
accommodation, equipment or otherwise. 
(31) To direct and supervise the discharge of functions of the Council under the Registration
of Births, Deaths and Marriages (Scotland) Act 1965 and the Marriage (Scotland) Act 1977
and any enactments altering or amending the same. 
(32) To consider and agree action in relation to petitions received by the Council relative to the
business of the Committee. 
(33) Oversight on broader Human Resource and Workforce matters such as employability,
managing absence, reviewing and managing human resource risks and programmes of
work under the "Workforce for the Future" strategy, including the Council's apprenticeship
programme. 
(34) To determine on behalf of the Council, responses to consultations in relation to pay
negotiations and associated national conditions of service. 
(35) To consider all matters associated with the employment policies and practices in relation
to the human resources of the Council including:- 
(a) the establishment of all services of the Council, and 
(b) the salaries, pay, and Conditions of Service of all Council employees including
matters associated with Sick Pay Schemes, Pensions and Accident Assurance
and Allowances. 
(36) To promote good industrial relations between the Council and its employees. 
(37) To grant authority to Members to attend seminars, conferences and other visits
concerning matters within the areas of responsibility of this Committee. 
(38) To accept tenders for previously approved projects within the responsibility of this
Committee. 
(39) To consider and agree action in relation to petitions received by the Council relative to the
business of the Committee. 
(40) To allocate to a Council Committee or to dispose of Council property other than Council
houses or lock-ups whether by way of sale or lease and irrespective of the identity of the
Committee to which such property was previously allocated. 
(41) To determine terms on which property and land is disposed of or acquired by the Council,
whether by way of sale, purchase, lease or otherwise. 
(42) To secure the provision of a complete construction service to the Council (non-housing)
and to all services of the Council including all feasibility, technical advice, brief preparation
work, programming, client and related tenant communications and all project
management duties of design and construction works implementation including site
supervision. 
(43) To secure the preparation, review, selection and appointment of all construction related
consultancy services (non-housing), including Construction (Design and Management)
Regulations and Health and Safety Regulations requirements, utilising both in-house
services and external services employed on fee basis arrangements.  Page 9 of 142

Page 10

(44) To secure the maximisation of use of construction resources, the achievement of value
for money in consultancy services and the progress of project implementation to optimise
the use of available finance and, thereby, assist all services of the Council (non-housing)
in achieving their objectives. 
(45) To secure the management and monitoring of all construction contract works (non-
housing) and related project expenditure and capital and revenue projects. 
(46) To deal with the creation and maintenance of the select list of contractors eligible to tender
for all construction works of the Council and to be responsible for determining if and when
a contractor should be removed from such a list. 
(47) To compile and maintain a register of all land and buildings owned or occupied by the
Council, incorporating information on location, size, use, condition, occupation, leases,
rentals, reviews and Committee allocation. 
(48) Subject to the operational requirements of a Committee to which property has been
allocated, to establish an effective system of management of all Council property other
than Council houses or lock-ups, including procedures for inspections, and assessment
of running costs. 
(49) To consider all matters relating to building works, both capital and maintenance, in respect
of all land and buildings used by more than one service of the Council (non-housing). 
(50) Except insofar as falling within the specific Terms of Reference of another Committee, to
oversee the specification of tenders, assess and authorise acceptances of such tenders,
monitor the performance of contracts and authorise the termination of any contracts for
maintenance of Council ground and to accept other tenders within the responsibility of
this Committee. 
(51) Provide Financial Inclusion services for the Council and the Health and Social Care
Partnership and monitor the provision of related services delivered through external
funding to third party providers. 
(52) To oversee all matters relating to central purchasing of goods and services, including
policies on procurement. 
(53) * To prepare and review Standing Orders relating to Contracts and Regulations governing
financial and contractual matters. 
(54) To provide oversight of the Council's Information Technology (IT) service in relation to
performance, expenditure and service delivery. 
(55) To advise and represent the Council on all matters relative to the operation of the
Lanarkshire Valuation Joint Board. 
Page 10 of 142

Page 11

JOINT  CONSULTATIVE  COMMITTEE  FOR  LOCAL  GOVERNMENT  EMPLOYEES  - 
19  MARCH  2024 
1
19 March 2024 at 2 pm. 
A Meeting of the JOINT  CONSULTATIVE  COMMITTEE  FOR  LOCAL  GOVERNMENT 
EMPLOYEES 
PRESENT 
Councillor Boyd, Vice-Convener; Councillors Ballinger, Brannan-McVey, Carragher, Duffy, Hume, Jarvie,
D. Johnston, and Logue. 
M. Quigley, Convener, Unison; A. Clark and J. Watson, Unison; D. Whelan, GMB, and J. Rooney, Unite
(T & G). 
CHAIR 
M. Quigley (Convener) presided. 
IN  ATTENDANCE 
Employment and Policy Manager; Occupational Safety and Wellbeing Manager, and Administrative Officer. 
APOLOGIES 
Councillors M. Coyle and Currie. 
H. Smith, GMB and J. Hannigan, Unison. 
DECLARATIONS  OF  INTEREST  IN  TERMS  OF  THE  ETHICAL  STANDARDS  IN  PUBLIC  LIFE  ETC. 
(SCOTLAND)  ACT  2000 
1. There were no declarations of interest. 
ABSENCE  REPORT  DECEMBER  2023  AND  QUARTER  3  2023/24 
2. There was submitted a report by the Chief Officer (People Resources) (1) providing the sickness
absence position for each Council Service, and the Council overall, for Quarter 3 2023/24, and
December 2023, together with comparative data for the previous year; (2) advising (a) that Enterprise
and Communities was the only Council Service to improve in absence levels from the same Quarter
in the previous year, and (b) that, whilst Adult Health and Social Care’s absence levels had remained
static over the last two months, the absence levels were still significantly higher than the Council
overall; (3) setting out, within the report, sickness absence targets for 2023/24; (4) informing that in
December 2023 there was a 6% improvement in Mental Health related absences which was reflective
of the work that had been, and continues to be, done around mental health, and (5) providing details
of the Health and Wellbeing activity which had been undertaken. 
Thereon, the Employment and Policy Manager advised that (1) a Working Group would be established
to explore the benefits of Self-Service Health Kiosks, and representatives from the Services would be
asked to participate, and (2) details of where compliance checks had been undertaken would be
included within future absence reports. 
During discussion, it was requested that further information be provided to the Trade Unions around
the Employee Counselling Service and how this was delivered to employees.
Item 3
Page 11 of 142

Page 12

JOINT  CONSULTATIVE  COMMITTEE  FOR  LOCAL  GOVERNMENT  EMPLOYEES  - 
19  MARCH  2024 
2
Decided: 
(1) that the sickness absence information for Quarter 3 2023/24, and December 2023, be noted; 
(2) that it be noted that a Working Group would be established to explore the benefits of the
Self-Service Health Kiosks, and that representatives of the Services would be asked to
participate; 
(3) that details of where compliance checks had been undertaken would be included within future
absence reports, and 
(4) that further information would be provided to the Trade Unions around the Employee
Counselling Service and how this would be delivered to employees. 
END  VIOLENCE  AT  WORK  CHARTER 
3. The Employment and Policy Manager informed that the Trade Unions had requested that the Council
sign up to Unison’s End Violence at Work Charter. 
Thereon, the Occupational Safety and Wellbeing Manager (1) provided an update on the Council’s
position in respect of the ten standards required by employers to qualify for Unison’s End Violence at
Work Charter, and (2) advised that “Trauma Informed” training would be provided to employees in due
course. 
Following discussion, it was agreed that the Council and Trade Unions would work together towards
agreeing an End Violence at Work Charter. 
Councillor Logue enquired whether the Council’s Residential staff had access to the services of Crisis
Aggression Limitation Management (CALM) or Therapeutic Crisis Intervention (TCI), and, following
discussion, it was agreed that a report exploring options for a one standard service for all employees
be submitted to the appropriate Committee of the Council. 
Decided: 
(1) that Council and Trade Unions work together to agree a Violence at Work Charter for North
Lanarkshire, and 
(2) that the report be otherwise noted. 
USE  OF  PERSONAL  MOBILE  PHONES 
4. The Employment and Policy Manager informed that the Trade Unions had enquired whether
employees who do not have a Council phone should use their own mobile phones to download the
authenticator app to enable them to log into Microsoft Office applications. 
The Employment and Policy Manager advised, following discussion with the Chief Officer (Business
and Digital), that Microsoft had been contacted with a view to finding an appropriate solution. 
Decided: that, following the outcome of discussions with Microsoft, confirmation would be
provided to the Trade Unions, and submitted to a future meeting of this Committee.
Page 12 of 142

Page 13

Amendment to Byelaws on the Employment of Children
North Lanarkshire Council
Report 
Does this report require to be approved? ☒ Yes  ☐ No
Ref E&F/GMcL/Contracts Date 22/05/24 
From Gerard McLaughlin, Chief Officer (Education North)
E-mail McLaughlinG@northlan.gov.uk Telephone 
Executive Summary
In accordance with the Young Persons (Scotland) Act 1937, North Lanarkshire Council’s
Byelaws on the Employment of Children sets out the conditions under which children and
young people may be employed.
The current byelaws were last amended in 2001 and, as such, do not take account of more
recent changes to secondary school timetabling that provide a core curriculum of 32
periods over four and a half days of delivery, otherwise known as Future Fridays. 
It is proposed that the byelaws are amended to permit the employment of secondary school
children on a school day that falls on a Friday for up to four hours instead of the current
two hours. Whilst this will not change the total hours permitted, it will allow applications for
employment to take account of the earlier finish for secondary pupils. It will remain the case
that any application for a work permit is considered on an individual basis and only where
such employment is in the child’s best interests. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1)  Approve the proposed change to the Employment of Children byelaws to reflect the
reconfigured school week. 
The Plan for North Lanarkshire
Priority Support all children and young people to realise their full potential
Ambition statement (6) Raise attainment and skills for learning, life, and work to
enhance opportunities and choices
Programme of Work Brighter Futures
Finance and Resources Committee
Item 4
Page 13 of 142

Page 14

1. Background 
1.1 In Scotland, the Children and Young Persons (Scotland) Act 1937, Section 28 (as
amended) states that children, who are under school leaving age, are allowed to work
but only where their safety, health, development, and education are not put at risk. The
rules about employing children are set by local authorities. 
1.2 North Lanarkshire Council’s byelaws on the Employment of Children were confirmed
by the Scottish Executive’s Education Department and were effective from 5 January
2002.
1.3 Education and Families Service implemented a reconfigured timetable for secondary
pupils, in August 2021, providing a core curriculum into 32 periods over four and a half
days with a finish on Fridays at 12:30 hours. 
2. Report 
Proposal for change to Byelaws 
2.1 The current byelaws states that: 
“No child shall be employed on any school day for a period or periods exceeding a total
of two hours, provided that not more than one hour of the said period or periods of
employment may take between 07.00 hours and 08.30 hours and the remainder of the
said period or periods of employment, if any, shall take place between 16.30 hours and
19.00 hours”.
2.2 The proposed change (as highlighted at Appendix 1) will permit a child to work on a
school day that falls on a Friday for up to four hours instead of two hours, given the
early finish for secondary pupils at 12.30 hours. The same requirement of not more
than one hour, of the four hours, may take place between 07.00 hours and 8.30 hours,
with the remainder of the four hours, if any, to take place between 14.00 hours and
19.00 hours. 
2.3 There will be no change to the total hours permitted to work on a school day that falls
on a Monday to Thursday; that will remain at a total of two hours per day. 
2.4 The proposed changes to the byelaws for a school day that falls on a Friday will be on
the basis that the hours and nature of the employment are not detrimental to the child’s
safety, health, development, and education. 
2.5 Applications for work permits for children are considered on an individual basis and
only permitted where the school confirms that the employment is in the child’s best
interest. 
2.6 The proposed change to the byelaws provides availability for young people to further
develop their life skills should they choose to do so and aligns with aims to develop the
young workforce. 
3. Measures of success 
3.1 Byelaws on the employment of children which are congruent with current practice. 
Page 14 of 142

Page 15

4. Supporting documentation 
4.1 Appendix 1 – Byelaws for Employment of Children (proposed amendments
highlighted) 
4.2 Previous relevant committee reports:
• General Purposes Committee on 08/05/01 – Protection of Children at Work: Byelaws
• General Purpose Committee on 18/02/02 – Byelaws on the Employment of Children
• Education and Families Committee on 24/11/20 – A Progress Update on the
Revision of the North Lanarkshire Curriculum Offering
• Education and Families Committee on 23/11/21 - A Progress Update on the
Revision of the North Lanarkshire Curriculum and introduction of 32 period week 
Gerard McLaughlin
Chief Officer (Education North) 
Page 15 of 142

Page 16

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
If Yes, have all relevant financial impacts been discussed and agreed with
Finance?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☒ No ☐
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact?
The changes will allow the current byelaws to better reflect time available to
children and young people to participate in work-related activity.
5.5 Data protection impact
Does the report / project / practice contain or involve the processing of personal
data?
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk
Yes ☐ No ☐  
Page 16 of 142

Page 17

5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact   
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC).
The proposed amendment remains consistent with current legislative practice and
it not understood to have a direct impact on civil, political, economic, social or
cultural rights of children. 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒
Page 17 of 142

Page 18

B y e la w s
Appendix 1 
On the Employment of Children 2024
Page 18 of 142

Page 19

North Lanarkshire Council, in exercise of the powers
conferred on it by Sections 28(2) and 30(2) of the
Children and Young Persons (Scotland) Act 19371,
hereby makes the following Byelaws : 
Citation
These Byelaws may be cited as the North
Lanarkshire Council Byelaws on the
Employment of Children 2024. 
Interpretation and extent
(2) In these Byelaws, unless the context otherwise
requires : 
• “the authority” means North Lanarkshire
Council;
• “child” means a person who is not for the
purposes of the Education (Scotland) Act 19802
over school age; 
• “employment” includes assistance in any trade
or occupation which is carried on for profit,
whether or not payment is received for that
assistance, and does not include a work
experience scheme under Section 123 of the
Education (Scotland) Act 1980;
• “light work” means all work which, on account
of the inherent nature of the tasks which it
involves and the particular conditions under
which they are performed is not likely to be
harmful to the safety, health or development of
children and is not such as to be harmful to
their attendance at school, their participation in
vocational guidance or training programmes or
a work experience scheme under section 123 of
the Education (Scotland) Act 1980 or their
capacity to benefit from the instruction
received;
• “parent”, in byelaw 10(d), includes any person
who has parental responsibilities in relation to a
child (within the meaning of section 1(3) of the
Children (Scotland) Act 1995)3;
• “public place” includes any public park, garden,
sea beach or railway station and any ground to
which the public for the time being have or are
permitted to have access, whether on payment
or otherwise;
• “street” includes any highway and any public
bridge, road, lane, footway, square, court, alley
or passage, whether a thoroughfare or not;
“street trading” includes the hawking of
newspapers, matches, flowers and other
articles, playing, signing or performing for
profit, shoe blacking and other like occupations
carried on in any street or public place; 
• “year”, except in expression of age, means a
period of twelve months beginning with 1st
January. 
1 1937 c.37
2 1980 c.44
3 1995 c.36 
Prohibited Employment 
(3) No child of any age may be employed -
(a)  in a cinema, theatre, discotheque,
dance hall or night club, except in
connection with a performance given
entirely by children;4 
(b)  to sell or deliver alcohol, except in
sealed containers;
(c)  to deliver milk, or any other dairy
products; 
(d) to deliver fuel oils;
(e) in a commercial kitchen;
(f) to collect or sort refuse; 
(g) in any work which is more than three
metres above ground level or, in the
case of internal work, more than three
metres above floor level;
(h) in employment involving harmful
exposure to physical, biological or
chemical agents; 
(i) to collect money or to sell or canvass
door to door, except under the
supervision of an adult;
(j) in work involving exposure to adult
material or in situations which are for
this reason otherwise unsuitable for
children; 
(k) in telephone sales; 
(l) in any slaughterhouse or in that part of
any butcher’s shop or other premises
connected with the killing of livestock,
butchery, or the preparation of
carcasses or meat for sale;
(m) as an attendant or assistant in a
fairground or amusement arcade or in
any other premises used for the
purpose of public amusement by
(n) means of automatic machines, games of
chance or skill or similar devices;
(o) in the personal care of residents or any
residential care home or nursing home
unless under the supervision of a
responsible adult. 
Permitted employment of children aged 14 and
over 
4 This does not prevent children taking part in performances
under the provisions of a licence granted in accordance with the
Children and Young Persons Act 1963, and the associated
Regulations
(1)
Page 19 of 142

Page 20

(4) A child aged 14 or over may be employed only
in light work. 
Permitted employment of children aged 13
(5) A child aged 13 may not be employed except in
light work in one or more of the following
specified categories: 
(a) agricultural or horticultural work;
(b) delivery of newspapers, journals and
other printed material, and collecting
payment for same, subject to the
provisions of byelaw 3(i); 
(c) shop work, including shelf stacking;
(d) hairdressing salons;
(e) office work; 
(f) car washing by hand in a private
residential setting;
(g) in a cafe or restaurant;
(h) in riding stables; 
(i) domestic work in hotels and other
establishments offering
accommodation;
(j) medical and dental surgeries; 
(k) race courses, dog racing enclosures,
football grounds or similar premises.
Hours of Employment
(6) 
(a) no child shall be employed on a school
day, that occurs on a Monday to
Thursday, for a period or periods
exceeding a total of two hours, provided
that not more than one hour of the said
period or periods of employment may
take between 07.00 hours and 08.30
hours and the remainder of the said
period or periods of employment, if any,
shall take place between 16.30 hours
and 19.00 hours. 
(b) no child shall be employed on a school
day, that occurs on a Friday, for a
period or periods exceeding a total of
four hours, provided that not more than
one hour of the said period or periods of
employment may take between 07.00
hours and 08.30 hours and the
remainder of the said period or periods
of employment, if any, shall take place
between 14.00 hours and 19.00 hours. 
(c) no child shall be employed in any non-
school day except between 07.30 and
19.00. 
(7) No child shall be employed during any period
when prevented from attending school by
reason of illness or contact with infectious or
contagious disease. 
Children exempted or excluded from attendance
at school 
(8) No child shall be employed during any period
when they are:-
(a) exempt from attendance at school, in
terms of Section 34 of the Education
(Scotland) Act 1980; or 
(b) excluded from attendance at school.
Additional conditions
(9) No child may be employed in any work out of
doors unless wearing suitable clothes and
shoes. 
Notification of employment and employment
permits
(10) Within one week of employing a child, the
employer must send to the authority written
notification stating: 
(a) their own name and address;
(b) the name, address and date of birth of
the child;
(c) the hours and days on which the child is
to be employed, the occupation in which
the child is to be employed, details of
the task involved and, if different from
(a) above, the place of employment;
(d) a statement of the child’s fitness to
work, and of approval for the child to be
employed, completed by the child’s
parent; 
(e) details of the school at which the child is
a registered pupil; and 
(f) a statement to the effect that an
appropriate risk assessment has been
carried out by the employer.
(11) Where, on receipt of a notification, the
education authority is satisfied that: 
(a) the proposed employment is lawful;
(b) the child’s health, welfare or ability to
take full advantage of their education
would not be jeopardised; and 
(c) the child is fit to undertake the work for
which they are be employed, it will
issue the child with an employment
permit.
(12) Before issuing an employment permit an
education authority may require a child to have
a medical examination.
Illness etc.
Page 20 of 142

Page 21

(13) The employment permit will state: 
(a) the name, address and date of birth of
the child;
(b) the hours and days on which the child is
to be employed, the occupation in which
the child is to be employed, details of
the task involved and the place of
employment; 
(14) A child may be employed only in accordance
with the details shown on their employment
permit.
(15) An education authority may if it considers it
appropriate amend a child’s employment permit
from time to time and without prejudice to the
foregoing generality may do so on the
application of an employer. 
(16) The education authority may if it considers it
appropriate at any time revoke a child’s
employment permit and without prejudice to
the foregoing generality may do so if it has
reasonable grounds to believe - 
(a) that the child is being unlawfully
employed, or 
(b) that their health, welfare or ability to
take advantage of their education are
suffering or likely to suffer as a result of
the employment.
(17) A child must produce their employment permit
for inspection when required to do so by an
authorised officer of the authority or a police
officer. 
Street Trading 
(18) No child under the age of 14 may engage in
street trading and a child aged 14 or over may
not engage in street trading unless:
(a) They are employed to do so by their
parents, in connection with their retail
business and under their direct
supervision; and 
(b) They have been granted a licence to do
so (“a street trader’s licence”) by the
authority and is acting in compliance
with the terms of that licence. 
(19) The authority shall not grant a street trader’s
licence to any child if it has reason to believe
that the employment of the child in street
trading would be prejudicial to their health,
welfare or ability to take full advantage of their
education or the child’s street trader’s licence
has previously been revoked. 
(20) A street trader’s licence (which may be
considered in relation to any places or times
other than Sunday) shall:
(a) be valid for not more than 12 months
and shall expire on 31 December; 
(b) prohibit the holder from touting or
importuning to the annoyance or
obstruction of any member of the public
in any street or public place;
(c) define the days, and hours, during
which, and the places at which the child
may engage or be employed in street
trading, and 
(d) require that the child notify the
authority within one week of any
change of address. 
(21) The authority may suspend or revoke a street
trader’s licence if it has reason to believe that
the holder’s continued employment in street
trading would be prejudicial to their health,
welfare, or ability to take full advantage of their
education, or if the holder:
(a) is found guilty of any offence connected
with the street trading;
(b) commits any breach of these Byelaws or
the terms of their street trader’s
licence; 
(c) uses the licence as a means for
begging, immorality or any other
improper purpose; or
(d) fails to notify the authority within one
week of any change of address.
Revocation 
(22) The Byelaws governing the employment of
children made by North Lanarkshire Council on
5 January 2002 and confirmed by the Secretary
of State for Scotland on 20 December 2001
shall be hereby revoked.
Page 21 of 142

Page 22

Page 22 of 142

Page 23

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref AA/REB Date 24/05/24 
Registration Services 
From  Archie Aitken, Chief Officer (Legal and Democratic)  
E-mail aitkena@northlan.gov.uk Telephone 
Executive Summary
This report provides details of the performance of North Lanarkshire Council’s Registration
Service in 2021 and 2022 and provides an update on current and future operations. 
Recommendations
It is recommended that Finance and Resources Committee: 
(1) Gives consideration to the contents of the report.  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of
Work Statutory/corporate/service requirement
Item 5
Page 23 of 142

Page 24

1. Background 
1.1 North Lanarkshire Council’s Registration Service is part of Legal and Democratic and
deals with births, deaths and marriages on behalf of the Registrar General for Scotland. 
Registrars conduct a variety of civil ceremonies, including marriage ceremonies, civil
partnership ceremonies and citizenship ceremonies. 
1.2 The Registration Service complies with all relevant statutory obligations and best
practice guidance and employs 14.5 FTE staff who are designated as static workers,
12 of which hold the Certificate of Proficiency in the Law and Practice of Registration. 
The Registration Service currently operates from three offices; Airdrie, Cumbernauld
and Motherwell.   
2. Report 
2.1 The Registration Service continues to face a high level of demand and works on a
flexible basis to meet this utilising an appointment basis, with appointments being in
person, over the telephone and by way of video conference. Motherwell’s Registration
office moved from the Civic Centre to the Dalziel Building in December 2022.  Staff
currently located within Cumbernauld Registration office will relocate to Airdrie
Registration office in May 2024, but will continue to provide a registration service in
Cumbernauld by way of the current appointment system. 
2.2 The Registration Service’s performance is monitored both internally by way of
performance management and externally, usually on an annual basis, by District
Examiners from the National Records of Scotland. 
2.3 The number of life events carried out by the Registration Service in 2021 and 2022 are
summarised in Appendix A.  The registers for 2021 and 2022 have been examined by
the District Examiner and the accuracy rate is also detailed in Appendix A.  The
Registration Service aims to provide an accurate service i.e. greater than 96% accuracy
which has been achieved in each District. 
2.4 The Registration Service is responding to the current levels of demand by active
monitoring, review and allocation of resources.  The Registration Service will continue
to be reviewed in light of any legislative changes, best practice guidance and/or
changing patterns of customer demand.   
3. Measures of success 
3.1  The continuation of a highly efficient and effective Registration Service to the people of
North Lanarkshire.   
4. Supporting documentation 
Appendix A – Registration Events 
Archie Aitken
Chief Officer (Legal and Democratic)
Page 24 of 142

Page 25

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 25 of 142

Page 26

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC).
The proposed amendment remains consistent with current legislative practice and
it not understood to have a direct impact on civil, political, economic, social or
cultural rights of children. 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 26 of 142

Page 27

Appendix A
Registration Events 
2021 
District Name
Births
Deaths
Religious
Marriages
Civil
Marriages
Total
Marriages
Civil
Partnerships
Stillbirths
Total Events
No. of Entries
with Errors
%
of
Entries
without
Corrections 
%
Error Rate
North
Lanarkshire,
North
(Cumbernauld) 
704  895  137  32 169 1 1 1,770  57 96.78% 3.22%
North
Lanarkshire,
Central (Airdrie) 
951  1,645  60  79 139  0 7 2,742  70 97.45% 2.55%
North
Lanarkshire,
South
(Motherwell) 
1,435  1,981  201 123 324  1 7 3,748  47 98.75% 1.25%
Total  3,090  4,521  39 234 632  2 15 8,260  174 97.89% 2.11% 
Page 27 of 142

Page 28

2022 
District Name
Births
Deaths
Religious
Marriages
Civil
Marriages
Total
Marriages
Civil
Partnerships
Stillbirths
Total Events
No. of Entries
with Errors
%
of
Entries
without
Corrections 
%
Error Rate
North
Lanarkshire,
North
(Cumbernauld) 
588  969  175  37 212 2 2 1,773  29 98.36% 1.64%
North
Lanarkshire,
Central (Airdrie) 
994  1,648  103 55 158  4 1 2,805  92 96.72% 3.28%
North
Lanarkshire,
South
(Motherwell) 
1,351  1,802  267 138 405  4 3 3,565  49 98.63% 1.37%
Total  2,933  4,419  545 230 775  10 6 8,143  170 97.91% 2.09% 
Page 28 of 142

Page 29

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    NLP/IM/JMcK Date 22/05/24 
North Lanarkshire Properties LLP – Performance Indicators: 4
August 2023 to 31 March 2024 and Financial Performance as at 5
January 2024 
From  James McKinstry, Chief Officer (Assets and Procurement)  
E-mail martini@northlan.gov.uk Telephone Ian Martin
Tel: 07966 397637 
Executive Summary
This report provides details of North Lanarkshire Properties LLP’s (NLP LLP) performance
from 4th August 2023 to 31 March 2024 and provides an update on significant events and
service delivery highlights during the reporting period. 
The report also provides details of the financial performance for the period from 1st April
2024 to 5th January 2024. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledges NLP LLP’s operational performance against its 2023/24 targets for the
period 4th August 2023 to 31 March 2024; 
(2) Acknowledges NLP LLP’s financial performance during the period from 1 April 2023
to 5th January 2024. 
(3) Acknowledges the Service delivery highlights detailed within the report;  
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (3) Maximise the use of our marketable land and assets through
improved development in business and industrial infrastructure
Programme of Work Transforming Places
Item 6
Page 29 of 142

Page 30

1. Background 
1.1 NLP LLP is a limited liability partnership established in 2013 between the Council and
its wholly owned company, North Lanarkshire Property Investments Ltd. It undertakes
the marketing, leasing and management of the Council’s commercial property portfolio
(shop units, office accommodation, business centres, industrial yards and storage
units) and, on behalf of the Council, manages legacy properties which remain in the
Council’s investment property portfolio. It also delivers services in relation to externally
owned properties that the Council leases for its own operational use and provides
general advice on lease transactions. 
1.2 Governance, strategic direction and oversight of the limited liability partnership is
provided by the Management Committee which comprises four elected members and
one senior Council officer appointed by the Council and one member appointed by the
limited company, NL Property Investments Ltd. Members to the Board of Directors of
the limited company, NL Property Investments Ltd, are also appointed by the Council
with five elected members and one senior officer appointed. The Management
Committee meets quarterly and is responsible for ensuring NLP LLP’s services are
delivered in accordance with the approved Service Level Agreement and company
objectives. 
1.3 The Management Committee undertook a number of measures to implement
recommendations from the ALEO review completed in 2018/19, most significantly, the
establishment restructure and enhancement proposals approved in February 2019. 
1.4 A further review of ALEO’s is being undertaken with a future report being presented to
the Policy and Strategy Committee for consideration on completion of this review.   
2. Report 
Performance Indicators 
2.1 Following changes to the council’s Scheme of Administration, responsibility for
oversight of service delivery by arm’s length bodies now rests with the relevant service
committee. The functions delivered by NLP LLP on behalf of the council fall within the
Terms of Reference of this committee and a six monthly performance report is
submitted in line with the Strategic Performance Framework considered by members
in November 2019. The report will confirm where NLP LLP is fulfilling its contractual
obligations and meeting the council’s service delivery expectations, as well as providing
information from Finance on financial performance and overall financial standing within
the company. This information will help give early warning of any financial risks which
may give rise to operational or reputational risks for the council. 
2.2 2023/24 Performance indicators are listed at appendix 1 along with actual performance
for the period 4th August 2023 to 31st March 2024, which fulfil the reporting requirements
agreed between the organisation and the council and further demonstrate where NLP
LLP is contributing to the council’s strategic priorities. 
2.3 The performance indicators for this report have been extended beyond the normal 6
month period to align with NLP Performance reporting periods. Future reports will
provide 6 monthly performance indicators. 
Page 30 of 142

Page 31

2.4 During the reporting period a total of 29 properties were let, renewed or assigned (12
Office; 4 Retail and 13 Industrial) and there were 19 lease terminations over the
corresponding period.   
2.5 The percentage of vacant properties across the NLP portfolio over the corresponding
period are shown at Section 12 in Appendix 1. The vacancy rates have decreased from
14.74% in P13 2022/23 to 13.24% in P13 2023/24. 
Service Delivery Highlights 
2.6 NLP have partnered with NLP Growth Team to develop the existing Braidhurst
Industrial Site in Motherwell where the development value is estimated to be in the
region of £6.5m.  Funding of £1.9m has been secured from the Scottish Government
Regeneration Capital Grant Fund (RCGF) and a further £1.3m from Place Based
Investment Programme (PBIP) for the construction of around 10 incubator units to bring
and support small to medium sized local businesses.  The project is being jointly funded
by NLC and NLP where NLP has committed to provide up to 10% of the project value
capped at a maximum of £600,000.  NLC have also committed to provide £2.8m
towards the project. The project will also include the upgrading to the existing industrial
units within the site and forms part of a larger project with the formation of a transport
link at nearby Newhut Road and Bellshill Road. The contractor has now taken
possession of the site and it is anticipated that works will be completed in late summer
2024.
2.7 On completion of the redevelopment of the former Orrs building in Airdrie the two
ground floor retail units will transfer to NLP.  This will provide increased retail provision
within Airdrie and support the wider regeneration of the town centre. The asset transfer
will be funded by the Scottish Government Place Based Investment Programme.  
2.8 NLP is actively supporting the Council’s Ambition Plan for Town Centre regeneration.
This has taken the form of identifying properties which could be converted to residential
use in Motherwell and Airdrie and which can be sold to the Council to further its plans. 
Financial Impact
Public Accountability Obligations – Financial year 2023/24 
2.9 To satisfy the Council’s duty to ensure the organisation delivering property
management services on its behalf is financially sound, the Council’s Section 95 Officer
maintains appropriate and proportionate processes and procedures for scrutinising
NLP LLP’s financial performance. 
2.10 The Council’s Legal Agreements with NLP LLP specify the financial information which
NLP must submit to the Council including an annual business plan, quarterly
management accounts, audited financial statements etc., to enable Finance to assess
and report any financial risk likely to arise as a result of the Council using NLP LLP to
deliver these services. 
2.11 The Council expends revenue resources annually with NLP LLP to deliver services
which assist the Council in achieving its priority outcomes. The Council has a duty to
continue to ensure this money is being properly used to deliver both the Council’s and
NLP LLP’s key objectives. 
Page 31 of 142

Page 32

2.12 For financial year 2023/24, the Council’s approved revenue spend includes property
management services (£0.198m) and rental charges for properties utilised by the
Council. 
Financial Performance 1 April 2023 to 5 January 2024 
2.13 Based on the financial performance 5 January 2024 a projected transfer into reserves
of £0.684m is reported to 31 March 2024 which is a favourable movement against a
budgeted transfer out of reserves of £0.320m.  The position is reflective of the reduction
in capital payments negotiated as part of the loan refinancing facility in October 2023. 
Further details on financial performance are given in Appendix 2. 
2.14 Appendix 3 provides Balance Sheet balances as at 5 January 2024 along with the
comparative figures as at 31 March 2023.  Council representatives are asked to note: 
• The company has net assets of £49.907m predominately due to the change in
the loan refinancing facility, coupled with improvements in payments to
Creditors and receipt of income from Debtors.  This is a favourable movement
of £2.202m on the previous year-end position.
• Members should be assured that the company has sufficient resources to meet
its current obligations. 
Projected Cashflow to December 2024 
2.15  Appendix 4 provides the projected cashflow to 31 December 2024. The minimum
balance of cash projected to be held is £4.270m in April 2024. The cashflow position
includes approved utilisation of reserves and is reflective of the final loan refinancing
facility.  This demonstrates that NLP will continue to hold sufficient levels of cash. 
Bank Covenant 
2.16 The new loan facility also revised the covenant arrangements, with a focus on achieving
an Actual Debt Service Covenant (ADSC) ratio of 1.1:1 each period.  As at P10 the
ADSC is 1.15: which is in excess of the revised ratio agreed. 
Budget 2024/25 
2.17 NLP continue to operate in a challenging environment mainly as a result of the current
cost of living crisis.  Therefore, a range of budget planning scenarios were considered
during the budget setting process.  The budget, approved by the Board in February
2024, is based on assumptions which are in line with those used in North Lanarkshire
Council medium term financial plan. 
2.18 The NLP Board approved a budget transferring £0.421m into reserves after loan debt
repayments.  This improvement is due to the reduction in capital repayments which
were negotiated as part of the refinancing agreement in October 2023.  The budget
also incorporates anticipated increased expenditure in employee and financing costs
(following the refinancing of the loan facility) offset by decreases in property costs and
water rates as previous assumptions have not materialised. 
2.19 Following the refinancing of the Loan Facility, NLP LLP are required to report against
the ADSC covenant and are budgeting a rate of 1.21:1.  Further details of the 2024/25
Budget are given at Appendix 5.  Performance against approved budget will continue
to be carefully monitored throughout the forthcoming year. 
Page 32 of 142

Page 33

2.20 NLC continue to monitor NLP financial performance closely with updates provided to
the Corporate Management Team. 
3. Measures of success 
3.1 The financial position of the company is being monitored closely to ensure that NLP
LLP will continue to meet its loan obligations. 
3.2 The re-development of Braidhurst Industrial Estate will provide new and refurbished
industrial units for let, supporting new and expanding business and contributing to the
overall vision for the area. 
3.2  The transfer of the retail units as part of the Orrs building redevelopment will assist in
the regeneration of Airdrie town centre.   
4. Supporting documentation 
Appendix 1 
Appendix 2 
Appendix 3     
Appendix 4 
Appendix 5 
Performance Update – 4th August 2023 to 31st March 2024. 
Financial Performance to 5th January 2024 
Overall Financial Standing – Balance Sheet as at 5th January 2024 
Cashflow Forecast to December 2024 
Approved Budget 2024/25 
James McKinstry
Chief Officer (Assets and Procurement) 
Page 33 of 142

Page 34

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The financial performance of NLP is closely monitored by the council’s Section 95
Officer and the financial performance from 1st April 2024 to 5th January 2024 along
with other key financial information is detailed within the report.   
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 34 of 142

Page 35

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 35 of 142

Page 36

Page 36 of 142

Page 37

Page 37 of 142

Page 38

Page 38 of 142

Page 39

Page 39 of 142

Page 40

Page 40 of 142

Page 41

Appendix 2 
North Lanarkshire Properties LLP
Year to date 05 January 2024
Income & expenditure 2023/24 2023/24 Year to date 2023/24 2023/24
Commentary:- 2023/24 Annual Budget vrs
2023/24 Projected Outturn
Annual
Budget Budget Actual Variance
Projected 
Outturn Variance
£m £m £m £m £m £m
Rental, SLA income and Insurance Income 6.404 5.365 5.457 0.092 6.558 0.153 Forecast rental income higher than anticipated at
time of setting budget
Investment and other income 0.005 0 0 0.252 0.258 0.253 Over-recovery attributable to bank interest rates.
Total Income 6.409 5.369 5.713 0.344 6.816 0.407
Expenditure;
Employee costs (0.710) (0.452) (0.341) 0.111 (0.567) 0.144 Underspend due to vacancies.
Property Costs (2.132) (0.994) (0.991) 0.003 (2.128) 0.004 Minor variance.
Supplies & Services  & Admin Costs (0.694) (0.302) (0.307) (0.006) (0.689) 0.005 Minor variance.
Financing Costs (1.817) (1.514) (1.570) (0.057) (1.876) (0.059) Financing costs associated with the finalisation of
the loan agreement higher than budgeted.
Total Expenditure (5.353) (3.261) (3.210) 0.051 (5.260) 0.093
Trading Profit 1.056 2.108 2.503 0.395 1.556 0.500
Loan Principal Repayments (1.376) (0.747) (0.747) 0.000 (0.872) 0.503
Reduction in capital payments negotiated as part
of the loan refinancing facility to ensure that
quarterly covenants can be achieved.
Profit Transferred to/(out) Reserves (0.320) 1.361 1.756 0.395 0.684 1.004
Page 41 of 142

Page 42

Appendix 3 
North Lanarkshire Properties LLP
Overall Financial Standing - Balance Sheet as at  05 January 2024
Balances/ Indicator As at
05 Jan 2024
As At 
31 March 2023
Variance Commentary
£m £m £m
Fixed Assets 74.206 74.206 0.000
Current Assets:
Trade Debtors 0.646 0.730 (0.084) Improved timing re payments received.
Bad Debt Provision (0.222) (0.222) 0.000
Prepayment and Other Debtors 0.000 0.000 0.000
Bank and short term investments 6.736 9.166 (2.430)
Reduction predominately due to one-off capital
payment completed as part of the loan
refinancing facility in October 2023.
7.160 9.674 (2.515)
Current Liabilities:
Creditors (0.905) (1.610) 0.705 Improved timing re processing of invoices.
Other Creditors inc. VAT & other taxes (0.554) (0.879) 0.325 VAT due to HMRC and accrued interest.
Loan payments due in <1 yr (0.500) (33.686) 33.186
Reduction in capital payments negotiated as
part of the loan refinancing facility to ensure
that quarterly covenants can be achieved.
(1.959) (36.176) 34.217
Net current Assets/(liabilities) 5.201 (26.502) 31.702
Loan repayments due in > 1 yr (29.500) 0.000 (29.500) Balance of loan refinancing facility agreed in
October 2023.
Defined scheme pensions liabilities 0.000 0.000 0.000
Net Asset / (Liabilities) 49.907 47.704 2.202
Page 42 of 142

Page 43

Appendix 4 
0.0
1.0
2.0
3.0
4.0
5.0
6.0
Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24
Balance -£m
NLP Cash Flow Forecast to December 2024
Total Balances
Page 43 of 142

Page 44

Appendix 5 
North Lanarkshire Properties LLP
Approved Budget - 24/25
Income & expenditure 2023/24
2024/25
Approved Commentary
Annual
Budget
Annual
Budget Movement
£m £m £m
Rental, SLA income and Insurance Income 6.404 6.407 (0.003)
Minor increase based on current occupancy
Investment and other income 0.005 0.005 0.000
Total Income 6.409 6.412 (0.003)
Expenditure;
Employee costs (0.710) (0.769) 0.059 Budget increased to reflect actual pay increases arising
from pay awards during 2023/24 and estimated
additional pay awards for 2024/25.
Property Costs (2.132) (2.019) (0.113) Budget reduction in Property and Water rates as
previous assumptions did not materialise.
Supplies & Services  & Admin Costs (0.694) (0.713) 0.019 Minor increase.
Financing Costs (1.817) (1.991) 0.174 Increase is reflective of the refinancing of the loan facility
in October 2023.
Total Expenditure (5.353) (5.492) 0.139
Accounting Profit 1.056 0.921 0.136
Loan Principal Repayments (1.376) (0.500) (0.876) Reduction in capital payments negotiated as part of the
loan refinancing facility to ensure that quarterly
covenants can be achieved.
Profit Transferred to/(out) Reserves (0.320) 0.421 (0.740)
Page 44 of 142

Page 45

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    EK / GT Date 22/05/24 
Revenues and Benefits Update 
From  Elaine Kemp, Chief Officer (Finance)  
E-mail kempe@northlan.gov.uk Telephone 07939 280601 
Executive Summary
This report provides an update on the performance within the Revenues and Benefits
functions of Finance as at 31 March 2024. 
Key points to note include: 
• As at 31 March 2024, 94.05% of Council Tax due for 2023/24 had been collected.
This is a reduction of 0.84% for the same period last financial year linked to the
Cost of Living award of £150 received by many households during 2022/23. 
• Non-Domestic Rates collection has shown a year-on-year increase from 94.43% to
31 March 2023 to 94.62% to 31 March 2024. 
• The service continues to meet statutory timescales for administering benefits
applications and changes of circumstance. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the content of the report. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (21) Continue to identify and access opportunities to leverage
additional resources to support our ambitions
Programme of Work Statutory / corporate / service requirement
Item 7
Page 45 of 142

Page 46

1. Background 
1.1 The Finance service is responsible for the administration and collection of all local
taxation in North Lanarkshire in the form of Council Tax and Non Domestic Rates. 
1.2 In addition, the service administers a number of benefits for residents of North
Lanarkshire including Housing Benefit, Council Tax Reduction, Scottish Welfare Fund,
Discretionary Housing Payment, Free School Meals and Clothing Grants. 
2. Report  
Council Tax 
2.1 The graph below shows the cash collected at 31 March for each financial year. It is
worth noting that cash is allocated to specific Council Tax years so the graph represents
cash received against the initial billing year (i.e. billed and received in 2023/24) and
does not include cash collected in subsequent years (i.e. billed in 2022/23 but received
in 2023/24). This ensures a like for like comparison. 
2.2 The collection figure for 2023/24 financial year of 94.05% is 0.84% lower than the same
period last financial year. However, the prior year collection figure benefits from the
impact of the Scottish Government’s Cost of Living Award of £150 for eligible
households with total cash received of £18.6m improving the in-year collection figure. 
2.3 It should be noted that in-year collection of Council Tax is a Statutory Performance
Indicator. However, it does not reflect the overall collection rate of Council Tax which
includes collection of prior year arrears. This latter measure has a greater bearing on
the Council’s finances and is reflected in the regular budget monitoring reports to
Committee. 
90
91
92
93
94
95
96
97
98
99
100
2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24
Percentage of annual billing collected
(%)
Financial Year
Council Tax Collection Rate at 31 March
Page 46 of 142

Page 47

Non-Domestic Rates 
2.4 The following graph shows the cash collected at 31 March for each financial year: 
2.5 The collection figure for 2023/24 is 94.62%; 0.19% higher than the 2022/23 financial
year. This increase has occurred in the context of a challenging year for Non-Domestic
Rates collection following the impact of the revaluation at 1 April 2023 which increased
the number of accounts under review with the Assessor and delayed payment from
many businesses while their reviews conclude. 
Housing Benefits 
2.6 The data below highlights the Statutory Performance Indicators measuring the speed
of processing for new Housing Benefit claims and for changes in circumstances. The
table shows the cumulative figures for the 2023/24 financial year. The Scottish average
comparator is based on the latest information published by DWP at Q4 2022/23. 
Days to Process 2022/23 2023/24
Latest
available
Scottish
average
New Claims  15 15 19
Change of Circumstances  8 8 3 
2.7 The service continues to perform well in the speed of processing for new claims
compared to the most recent Scottish average. The service also continues to meet
statutory requirements for the speed of processing changes of circumstance.
Performance during the 2023/24 financial year was affected by both increasing demand
and a number of staff vacancies. To further improve efficiency the service is
progressing a number of digital related improvements such as development of the
Landlord Portal and robotic process automation for a number of high-volume tasks. The
Landlord Portal has recently gone live; therefore, it is anticipated that this action will
see an improvement in the handling of correspondence received direct from landlords 
90
91
92
93
94
95
96
97
98
99
100
2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24
Percentage of annual billing collected
(%)
Financial Year
Non Domestic Rates Collection Rate at 31 March
Page 47 of 142

Page 48

Council Tax Reduction Scheme 
2.8 As at 31 March 2024 a total of £26.097m in Council Tax Reduction has been awarded
for the 2023/24 financial year. This compares to £24.383m to the same period during
2022/23, representing an increase of £1.714m (7%). 
2.9 The service received 7,497 applications throughout the financial year compared with
6,685 during 2022/23, representing an increase of 12% 
2.10 The service received an increased number of notifications for changes in
circumstances. For 2023/24 a total of 119,698 changes were processed compared to
92,711 the previous financial year; an increase of 29%. 
Discretionary Housing Payments (DHP) 
2.11  From 1 April 2017 funding for DHP has been devolved to Scottish Government. This
funding supports both the Scottish Government’s commitment to fully fund the
implications of the Bedroom Tax and an additional sum available for other reasons such
as the Benefit cap and the restrictions on Local Housing Allowance rates. 
2.12 From 1 January 2023 the Scottish Government is fully funding the implications of
mitigating the benefit cap. This was announced as part of the tackling child poverty
delivery plan ‘Best Start, Bright Futures’ in March 2022. Local authority Leaders have
agreed to fuller benefit cap mitigation through the DHP scheme from 1st January 2023.
For 2023/24 the Scottish Government has provided ring-fenced funding of £0.301m to
mitigate the benefit cap.  For 2023/24 the amount paid in respect of the benefit cap was
£0.101m (34%). 
2.13 For 2023/24 the total paid in respect of Bedroom Tax was £5.805m. In comparison this
sum was £5.374m during 2022/23. 
2.14 In addition the Council also receives £0.467m in respect of non-bedroom tax related
issues. A further £0.122m has been carried forward from the previous financial year
and an additional £0.109m has been received for 2023/24 bringing the total budget for
the 2023/24 financial year to £0.698m. A total of £0.698m (98%) has been paid or
committed from the fund. 
Scottish Welfare Fund 
2.15 The Council has administered the Scottish Government’s Scottish Welfare Fund (SWF)
since 1 April 2016. 
2.16 The Scottish Government provides an annual award budget of £2.760m to North
Lanarkshire Council. A further £1.518m one-off funding has been allocated following a
decision of the Wellbeing and Tackling Poverty Committee on 5 May 2023. Therefore,
the total award budget for 2023/24 was £4.278m. The additional funding allocation
meant that the fund remained at Medium priority level throughout 2023/24. 
2.17 There are two grant schemes and their relative performance during 2023/24 and prior
year comparison is as follows: 
Page 48 of 142

Page 49

2023/24 
Applications
Assessed
Awards Unsuccessful
Applications
Acceptance
Rate
Crisis Grants 21,558 15,279 6,279 70.9%
Community Care
Grants
6,488 4,737 1,751 73.0%
Total 28,046 20,016 8,030 71.4% 
2022/23 
Applications
Assessed
Awards Unsuccessful
Applications
Acceptance
Rate
Crisis Grants 20,876 15,942 4,934 76.4%
Community Care
Grants
6,246 4,533 1,713 72.6%
Total 27,122 20,475 6,647 75.5% 
2.18 For the 2023/24 financial year the total value of grants paid from the Scottish Welfare
Fund amounted to £5.322m, representing an overspend of £1.044m. Given the cost of
living crisis the Service has maintained the priority level at Medium throughout 2023/24
to ensure as many residents are supported as possible. The financial impact has been
managed throughout the Finance and wider Chief Executive’s service. 
2.19 For the 2024/25 financial year, Scottish Welfare Fund applications will be assessed at
High priority. This means that applications will only be considered where there is
immediate and severe need, applicants are highly vulnerable, where there will be
significantly adverse impacts to health and wellbeing with a no grant award and where
the effect of the grant is immediate and substantial. Staff assessing Scottish Welfare
Fund applications are highly trained in making these judgements in accordance with
the statutory guidance and where an application is unsuccessful they will signpost the
applicant to other community based supports. 
2.20 During 2023/24, the Scottish Welfare Fund has seen a significant increase in demand
with an increase of 3.3% in Crisis applications assessed compared to the previous
financial year. Similarly, there has been an increase of 3.9% in the volume of
Community Care Grant applications assessed over the same period. 
2.21 The Service strives to assess applications within the timescales outlined within Scottish
Government guidance. Throughout the period the service has continued to assess
Crisis applications within the two working day time limit and the fifteen working day limit
required for Community Care Grant applications. The service prioritises resources to
ensure Crisis Grant applications are assessed timeously. 
3. Measures of success 
3.1  Continuous improvement in processing and collection rates.   
4. Supporting documentation 
None 
Page 49 of 142

Page 50

Elaine Kemp
Chief Officer (Finance) 
Page 50 of 142

Page 51

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 51 of 142

Page 52

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The Service has been liaising with Business and Digital on the Landlord Portal and
RPA developments and these will be managed in line with Business and Digital’s
available resources. 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC).  
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 52 of 142

Page 53

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    EK/KS/RM/GM Date 22/05/24 
Treasury Management Monitoring Report for quarter ended 31
March 2024 
From  Elaine Kemp, Chief Officer (Finance)  
E-mail mcnameer@northlan.gov.uk Telephone Ryan McNamee, Finance
Manager 
Executive Summary
This report fulfils the key requirements of the Council’s reporting procedures for Treasury
Management in accordance with the CIPFA Code of Practice on Treasury Management
and the CIPFA Prudential Code for Capital Finance in Local Authorities. It informs on the
quarterly Treasury Management activity for the period 1 January 2024 to 31 March 2024
and compliance with the mandatory treasury and prudential indicators. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the Treasury Management Activity for the quarter ended 31 March
2024 including the performance against the key treasury and prudential indicators.  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 8
Page 53 of 142

Page 54

1. Background 
1.1 The Council manages its treasury activities in line with the CIPFA Code ‘Treasury
Management in the Public Services’. The Code requires the Council to produce reports
on its Treasury Management policies, practices and activities on a regular and ongoing
basis. The Council fulfils these obligations, in part, by the preparation of this Treasury
Management Monitoring report produced on a quarterly basis, encompassing a review
of performance. 
1.2 The Council’s “Treasury Management Strategy 2023/2024 and Treasury and
Prudential Indicators 2023/2024 to 2025/2026” was approved by Committee at its
meeting on 1 March 2023. The Treasury activity undertaken in the final quarter of
2023/24 reflects the key requirements of the Council’s 2023/24 Treasury Management
Strategy, with the Public Works Loan Board (PWLB) and Long-term Money Market
being the prime source of long-term funds. In terms of investment activity, this is
conducted in accordance with the approved 2023/24 investment strategy. 
2. Report 
Summary Position 
2.1 The net overall borrowing position to 31 March 2024 is £1,021.7m, which is an increase 
of £143.5m from the position at the 31 December 2023.  A detailed breakdown of the 
net cash movement is shown in column (6) within Appendix 1 and is discussed below.  
Borrowing 
2.2 At the end of the quarter, total external debt amounted to £1,075.9m, an increase of 
£136.4m. This was primarily due to additional net longer-term borrowing of £89.4m being 
undertaken, comprising new PWLB borrowing of £100.0m, partially offset by repayment 
of existing PWLB debt of £10.7m.   
2.3 During the quarter the Council sourced PWLB loans totalling £100.0m on an equal 
instalment payment (EIP) basis, which provides a smoother debt maturity profile, thus 
spreading the refinancing risk.  Interest rates have generally remained steady during the 
quarter and within anticipated budgeted levels.  All borrowing was over 10-year terms, 
with one £10m loan at the PWLB HRA rate (see para 2.2.6) of 3.98%, and the other 
£90m at the certainty rate discount (see para 2.2.5) ranging between 4.23% and 4.80%. 
2.4 In addition, there was net decrease in net temporary borrowing of £0.7m, due to £68.8m 
of new borrowing being offset by £69.5m falling due for repayment. There was also an 
overall increase in existing PPP obligations of £47.8m due to impact of the utilisation of 
Service Concession flexibility arrangements as approved in the Treasury Management 
Strategy, consisting of an increased liability of £50.3m and a reduction in finance leasing 
liabilities chargeable in 2023/24 of £2.6m. 
2.5 The Council’s approach to borrowing is in line with the approved strategy which aims to 
source long-term borrowing and take advantage of temporary (short-term) borrowing at 
attractive rates, and where possible, using internal cash balances, to meet the principal 
repayments, daily revenue account requirements and the capital financing requirement, 
in lieu of future borrowing for capital purposes. The strategy adopted considers interest 
rate forecasts, the management of carrying costs and the retention of cash balances at 
appropriate levels, whilst managing the associated investment, interest, and liquidity risk. 
Page 54 of 142

Page 55

2.6 The Council made a successful application to the PWLB to access the certainty rate 
which allows a 20-basis point (bps) (0.20%) discount on loans from the PWLB 
under the prudential borrowing regime. This will continue to provide the Council with an 
opportunity to borrow from the PWLB at more beneficial rates until 30 April 2024. 
2.7 A new PWLB HRA rate, which is 0.4% below the certainty rate, has been available from 
15th June 2023, which will now be available until June 2025, to support local authorities 
borrowing for Housing capital purposes or refinancing existing loans. In conjunction with 
our treasury advisors, we continue to review the requirements and assess the borrowing 
opportunities for the Council. 
2.8 The CIPFA Prudential Code stipulates that local authorities cannot borrow to invest 
primarily for financial return, deeming it imprudent to make investment or spending 
decisions which will increase the capital financing requirement resulting in new 
borrowing, unless it is directly and primarily related to the functions of the Council. The 
Council is compliant with this requirement.  Members should note also that PWLB loans 
are no longer available to local authorities planning to buy investment assets primarily 
for yield. 
2.9 Members will be aware interest rates have risen significantly over the past 2 years, 
increasing materially the cost of both short and long-term borrowing. In this quarter, the 
Bank of England held the base rate at 5.25%. It should be noted that the Council’s cost 
of short-term borrowing also continued to increase, with the in-year rise in the base rate 
and short-dated market rates. The cost of short-term borrowing from other local 
authorities has generally risen with bank rate over the year. Interest rates peaked at 
around 7% towards the later part of March 2024 due to demand for cash across many 
authorities. It is anticipated that the rates will fall to more normal market levels in April 
2024. The average rate on the Authority’s short-term loans at 31st March 2024 was 
5.37%. 
2.10 Gilt yields have remained volatile, facing upward pressure following signs that UK 
inflation was stickier than expected. With the Bank of England not inclined to cut rates 
soon, yields rose again, consequently resulting in rising PWLB rates.  On 31 March, the 
PWLB certainty rates for maturity loans were 4.74% for 10-year loans, 5.18% for 20-year 
loans and 5.01% for 50-year loans. 
Debt Restructuring 
2.11  In conjunction with our Treasury advisors, we monitored the economic climate in 
relation to our financial targets and Treasury Management strategy, for the quarter 
under review. The interest rates prevailing throughout the period resulted in no 
beneficial opportunities for debt restructuring/rescheduling of the existing PWLB  debt 
portfolio arising. 
2.12 The Council continues to hold £3.0m of LOBO (Lender’s Option Borrower’s Option) 
loans where the lender has the option to propose an increase in the interest rate at 
set dates, following which the Authority has the option to either accept the new rate 
or to repay the loan at no additional cost.  The rise in market interest rates increases 
the probability of LOBOs being called, however, no lender exercised their option 
during the quarter.    
2.13 Further reports regarding future activity will be presented to Committee as appropriate.  
Page 55 of 142

Page 56

Investments  
2.14 Treasury management investments arise from cash flows or treasury risk management 
activity, that results in balances being invested, until the cash is required for use in the 
course of business. 
2.15 At the end of the final quarter of 2023/24, the Council held total investments of £54.2m, 
which is a net decrease of £7.0m in cash and cash equivalents, primarily due to an 
increase in the bank overdraft including cash in transit of £9.2m, offset by a £2.2m 
increase in short-term investments, reflecting maturing temporary investments of 
approximately £355.1m, and undertaking new short-term investments of £387.3m.   See 
summary at Appendix 1, column 6. 
2.16 At quarter end, the bank overdraft including cash in transit was £7.6m which is a net 
overdrawn position compared to the net cash position at the end of the previous quarter 
of £1.6m. The negative net cash movement reflects mainly BACS payroll payments, as 
no significant BACS payment runs fell due for clearance at the quarter end date due to 
the Easter holiday period. The balance at 31 March 2024 comprises £7.6m of net BACS 
credits outstanding due for clearance within 3 days of the quarter end date, cash in transit 
balance of £0.2m, partly offset by cheques unpresented of £0.2m. 
2.17 In line with the approved strategy to manage liquidity, the Council maintained a minimum 
balance of £3.0m available on an overnight basis (instant access), ensuring a prudent 
level of funds is maintained to meet all service requirements. 
2.18 During the quarter, the MPC voted to keep the Bank of England base rate at 5.25%.  This 
stabilising of the base rate over the period under review, resulted in short-dated cash 
rates also stabilising, with rates ranging between 5.14% at the beginning of January to 
5.12% at the end of March, a small reduction of 0.02% for overnight/7-day maturities. 
There is little noticeable difference between the 7 day and 1-month SONIA (Sterling 
Overnight Rate) bid rates and generally available investment rates offered by financial 
institutions and money market funds. Despite this, the Council will endeavour to achieve 
good performance levels in investment activity.  
2.19 Overall the Treasury Management team continues to take a prudent approach to 
investing surplus funds in line with the approved 2023/24 Investment Strategy. Security 
of investment followed by ensuring sufficient liquidity are key investment criteria 
governing Council investment decisions. This approach is aligned to the prudent 
management of liquidity to meet current commitments and future cash demands based 
on the latest cashflow projections.  
2.20 However, as demonstrated by the liability benchmark reported at (xi) below and 
Appendix 3 attached, it is anticipated the Council will be a long-term borrower and 
therefore new treasury investments are primarily made to manage day-to-day cash flows 
using short-term low risk instruments. The existing portfolio of strategic pooled funds will 
be maintained to diversify risk into different sectors and boost investment income. 
Non-Treasury Management Investments   
2.21 During the quarter, no repayments were due in respect of third-party advances in 
connection with the Cumbernauld Academy DBFM and Greenfaulds DBFM. 
Page 56 of 142

Page 57

Interest Rate Movements & Other Economic Updates 
2.22 As outlined by our treasury management advisors, UK inflation continued to decline 
from the 8.7% rate seen at the start of 2023/24.  By the last quarter of the financial year 
headline consumer price inflation (CPI) had fallen to 3.4% in February and to 3.2% in 
March, which was slightly higher than market expectations. The core measure of CPI, 
i.e. excluding food and energy, also slowed in February to 4.5% and further to 4.2% in 
March, a reduction from 5.1% in January, a rate that had stubbornly persisted for three 
consecutive months.  Whilst inflation has fallen in recent months it is still above the 
Bank of England’s 2% target at the end of the period. 
2.23 The UK economy entered a technical recession in the second half of 2023, as growth 
rates of -0.1% and -0.3% respectively were recorded for Q3 and Q4. Over the 2023 
calendar year GDP growth only expanded by 0.1% compared to 2022. Of the recent 
monthly data, the Office for National Statistics reported a rebound in activity with 
economy expanding 0.2% in January 2024. While the economy may somewhat recover 
in Q1 2024, the data suggests that prior increases in interest rates and higher price 
levels are depressing growth, will continue to bear down on inflation throughout 2024. 
2.24 The Bank of England’s Monetary Policy Committee (MPC) continued tightening 
monetary policy over most of the period, deciding to hold the base rate at 5.25%.   
Following the March MPC meeting, the Councils’ treasury adviser maintained its central 
view that 5.25% is the peak in the base rate and will most likely start to be cut in second 
half of 2024. The risks in the short-term are deemed to be to the downside as a rate 
cut may come sooner than expected, but then more broadly balanced over the medium 
term. Although financial markets shifted their interest rate expectations downwards with 
expectations of a cut in June, the MPC’s focus remained on assessing how long interest 
rates would need to be restrictive in order to control inflation over the medium term. 
2.25 In the February 2024 Monetary Policy Report the Bank’s expectations for the UK 
economy were positive for the first half of 2024, with a recovery from the mild recession 
in second half 2023 being gradual. Headline CPI was forecast to dip below the 2% 
target quicker than previously thought due to declining energy prices, these effects 
would hold inflation slightly above target for much of the forecast horizon. 
2.26 Recent data showed the unemployment rate 3month/year declined to 3.9% for the 
quarter to January before rising to 4.2% for the quarter to February. Pay growth edged 
higher to 5.6% at February and 6.0% for regular pay, above the Bank’s forecasts. 
Adjusted for inflation, pay growth in real terms were positive at 1.6% and 1.9% for total 
pay and regular pay respectively.   
2.27 Sentiment in financial markets remained uncertain and bond yields continued to be 
volatile over the year. During the first half of the year, yields rose as interest rates 
continued to be pushed up in response to rising inflation. From October they started 
declining again before falling sharply in December as falling inflation and dovish central 
bank attitudes caused financial markets to expect cuts in interest rates in 2024. When 
it emerged in January that inflation was stickier than expected and the BoE was not 
inclined to cut rates soon, yields rose once again, ending the period some 50+ bps 
(0.5%) higher than when it started. 
2.28 Gilt yields rose towards the end of the period.  The 10-year UK benchmark gilt yield rose 
from 3.44% to peak at 4.75% in August before reducing to 3.44% in late December and 
rising again to 3.92% at end of March.  The Sterling Overnight Rate (SONIA) averaged 
4.96% over the period.  This resulted in the standard PWLB 10 year borrowing rate 
increasing from 4.57% at the start of the quarter to 4.94% at the end of the quarter,
Page 57 of 142

Page 58

showing a spread of 0.75% between the highest and lowest interest rates of 5.24% and 
4.49% respectively, averaging 4.97%. 
2.29 Due to holding of the base rate during the period, short-term borrowing interest rates 
stabilised with the short term 7-day offer rate ranging between 5.33% and 5.38% over 
the period. Taking account of the increase in borrowing rates and advice from our 
treasury management advisors, it was considered more cost effective in the near term 
to use a combination of internal resources or to borrow rolling temporary / short-term 
loans at lower interest rates where possible rather than long term borrowing. This will 
result in increased temporary borrowing costs for the Council partially offset by increased 
investment income earned on surplus balances. 
2.30 The Treasury Management Section will continue to monitor financial and economic policy 
and their impact upon the Council’s investment and borrowing activity. 
The Prudential Code for Capital Finance in Local Authorities 
2.31 The Local Government in Scotland Act 2003 requires the Council to undertake its 
Treasury activities in line with the Prudential Code for Capital Finance in Local 
Authorities. 
2.32 Committee, at its meeting on 1 March 2023, approved a report titled, “Treasury 
Management Strategy 2023/2024 and Treasury and Prudential Indicators 2023/2024 to 
2025/2026”. This report detailed a variety of mandatory and local indicators aimed at 
assisting members to determine that proposed capital investment levels and treasury 
management decisions satisfied the key requirements of affordability, prudence and 
sustainability. Performance against key prudential indicators for 2023/24 to date is 
detailed within Appendix 2. 
(i) Indicator 1(a) illustrates planned investment on capital expenditure is forecast to
be lower than initially anticipated by £37.1m in 2023/24. This reflects a reduction
of £33.3m in the General Fund capital investment and £3.8m for the HRA
Mainstream and New Build programmes.  For further information, this is monitored
in detail as part of the Council's capital programme reporting mechanisms which
will provide spend details including any revisions to the estimates approved in
2023/24. 
(ii) The mix of resources required to finance the capital expenditure in 2023/24 reflects
the updates on forecast capital investment. Therefore, the level of in-year
borrowing is anticipated to be lower by £40.8m due to a reduction in General Fund
programme of £39.6m and £1.2m for HRA programme. This forecast level of
borrowing also reflects a net increase in capital grants and external contributions
of £9.1m with additional funds available to the General Fund and HRA programmes
of £2.4m and £6.7m respectively. A reduction of £5.9m of CFCR is also anticipated,
due to a decrease of £9.8m in HRA, and an increase of £3.9m in General Fund. 
(iii) As a result of accounting issues arising from the pandemic recovery, the
implementation of IFRS 16 Lease Accounting was further delayed. Therefore, a
restatement of existing liabilities for operating leases to the credit arrangement
category will be applied in 2024/25 with an estimated impact of £2.3m. In addition,
implementation of the Service Concessions flexibility in 2023/24 on PPP liabilities,
and subsequent impact of IFRS16 implementation in 2024/25, is estimated to
result in capital investment of £131.6m being recognised in the period to 2025/26. 
It should be noted that this does not represent cash expenditure and is offset by
recognition of associated credit arrangements financing.
Page 58 of 142

Page 59

(iv) Indicator 1(b) – The Council’s cumulative outstanding amount of debt finance is
measured by the capital financing requirement (CFR). The CFR is essentially a
measure of Council’s underlying borrowing need i.e. capital expenditure not
resourced by capital grants, receipts or CFCR, with any new borrowing increasing
the CFR. The CFR is projected to rise to £1,396m as at 31 March 2024. 
(v) The Prudential Code requires the Council’s capital investment to be prudent and
affordable. To demonstrate this, a Prudential Margin (the need to borrow versus
actual borrowing) is calculated. Indicator 1(c) demonstrates a healthy prudential
margin of £320.1m as at 31 March 2024. The timing and profile of external
borrowing to replenish cash reserves and balances are being managed, giving full
consideration to liquidity, interest rate and refinancing risk, whilst minimising the
potential carrying costs. 
(vi) Indicator 1(d) illustrates that both the overall Authorised Limit and Operational
Boundary limits for borrowing and long-term liabilities have not been exceeded,
with the maximum borrowing undertaken within the period being well below the
approved boundaries. 
(vii) Indicator 1(e) illustrates the financing costs forecasts as at 31 March 2024 for both
general fund and HRA as a proportion of net revenue stream. Although capital
expenditure is not charged directly to revenue, interest payable on loans, and loan
fund and long-term liability repayments are.  The net annual charge is known as
financing costs; this is compared to the net revenue stream i.e. the amount funded
from Council Tax, NDR and government grants. 
(viii) Indicator 2(a) highlights the proportion of external interest payable by the Council
which is fixed and variable over the term of the borrowing, and therefore the
exposure to the effects of interest rate changes. As at 31 March 2024, the level of
borrowing subject to variability is deemed to be within acceptable levels. 
(ix) Indicator 2(b) highlights a projected loan charge overspend of £6.1m compared to
the initial prudential estimates for 2023/24. This projection takes into account
treasury management activity, internal Interest on Revenue Balances (IORB)
recharges due to increasing market interest rates, the loans fund holiday flexibility
adopted in 2022/23 and decisions of the Policy and Strategy Committee and the
Strategic Capital Delivery Group to reprofile the capital programme in response to
the significant delivery related challenges. This current loan charge variance is
made up of: 
• A net treasury management overspend of £6.8m is projected (£3.6m General
Fund, HRA £3.2m), which is a primarily a reflection of increased internal IORB
charges, and incorporates cashflow management techniques adopted, e.g.
directing the timing of new borrowing, managing investment security, liquidity
and interest rate risk. 
• In 2023/24 it is anticipated there will be reduction in anticipated loans fund
advance repayments of £0.7m (£0.5m and £0.2m for the General Fund and
HRA respectively). This is primarily due to lower final outturn capital borrowing
in 2022/23 than previously forecast. 
Page 59 of 142

Page 60

(x) Indicator 2(c) relates to the level of fixed debt due to mature within time periods. 
The level of debt maturing remains within the upper limits set for each category at
the beginning of the financial year. 
(xi) The Liability Benchmark at Appendix 3 is a new indicator.  The Treasury
Management Code states that organisations should evaluate the amount, timing
and maturities needed for new borrowing in relation to planned borrowing needs,
in order to avoid borrowing too much, too little, too long or too short. The liability
benchmark is an important tool to help establish whether the Council is likely to be
a long-term borrower or long-term investor in the future, and so shapes its strategic
focus and decision making. Essentially this benchmark identifies the projection of
external debt/borrowing required over the long term to fund approved revenue &
capital budgets, while keeping treasury investments at the minimum level required
to manage day-to-day cash. 
(xii) This represents the comparison of the Council’s actual borrowing against an
alternative strategy. This utilises the forecasts for Capital Financing Requirement,
long-term liabilities, current external borrowing, balance sheet resources i.e.
reserves, and that cash and investment balances are kept to a minimum of £30.0m
at each year-end to maintain sufficient liquidity but minimise credit risk. 
(xiii) The Loans CFR (solid light blue) represents the total cost of the capital expenditure
plans based on the estimated current profile of the 5-year Capital Programme
2024/2025 to 2028/2029 as approved by Policy & Strategy Committee on 17th
March 2024.  This reduces over time as scheduled principal repayments are made
to the loans fund. The Net Loans Requirement (dotted red line) represents the
minimum external borrowing required to fund the current capital expenditure plans
assuming all cash reserves and balances are utilised to offset borrowing
requirements.  The Liability Benchmark (solid red line) represents the estimated
borrowing required, taken account of liquidity allowance required of £30.0m to be
held to maintain liquidity and to manage day-to-day cashflows. 
(xiv) The solid grey section shows the maturity profile of current borrowing.  The gap
between the grey section and the liability benchmark line represents the estimated
additional borrowing that is forecast will be required to fund the current capital
expenditure plans, via long-term and short-term borrowing options. 
3. Measures of success 
3.1 Overall the approach adopted by the Council’s Treasury Management team during the
quarter under review met the key requirements of the 2023/24 Treasury Management
Strategy. Prudential indicators have remained in accordance with those approved by
31/3/23
Actual
£m
31/3/24
Forecast
£m
31/3/25
Forecast
£m
31/3/26
Forecast
£m
Loans CFR 1,052.7 1,187.0 1,348.5 1,552.1
less Balance Sheet Resources (387.4) (333.8) (283.0) (264.2)
Net Loans Requirement 665.3 853.1 1,065.5 1,287.9
plus: Liquidity Allowance 30.0 30.0 30.0 30.0
Liability Benchmark 695.3 883.1 1,095.5 1,317.9
Existing Borrowing 749.2 866.9 590.6 553.7
New Borrowing Required 0.0 16.2 504.9 764.2
Page 60 of 142

Page 61

Committee on 1 March 2023. The projected final outturn illustrates a healthy prudential
margin and borrowing levels that are below sustainable limits, ensuring that the
projected capital investment levels remain affordable and sustainable. However, the
current financial volatility and increased borrowing costs has resulted in an assessment
being undertaken of the potential impact on future years of the current capital
programme.  This will continue to be monitored to determine if any further review of the
programme is required to ensure that it remains sustainably affordable. 
4. Supporting documentation 
Appendix 1:  Loans, Long term Liabilities & Investments as at 31 March 2024 
Appendix 2:  Summary of Treasury and Prudential Indicators as at quarter ended 31 
March 2024 
Appendix 3: Liability Benchmark as at quarter ended 31 March 2024 
Elaine Kemp
Chief Officer (Finance) 
Page 61 of 142

Page 62

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Financial impacts are outlined within the report.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 62 of 142

Page 63

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
As the Council borrows and invests significant sums of money it is exposed to
financial risks including the loss of invested funds and the revenue effect of
changing interest rates. Therefore, successful identification, monitoring and control
of risk remains central to the Council’s treasury management strategy. 
Treasury Management activity by its very nature has a number of inherent risks
including interest rate, liquidity and refinancing risks. To minimise risk for its
treasury management activities the Council adopts and operates in accordance
with the guidelines for best practice prescribed within the CIPFA “Treasury
Management in the Public Services” Code of Practice and the CIPFA Prudential
Code for Capital Finance in Local Authorities. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 63 of 142

Page 64

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 64 of 142

Page 65

LOANS, LONG TERM LIABILITIES & INVESTMENTS AS AT 31 MARCH 2024                                                              Appendix 1
DEBT RESTRUCTURING   
BALANCE       
1-January-24
EARLY
REDEMPTION REFINANCING
NEW
BORROWING /
LONG-TERM
LIABILITIES
PRINCIPAL
REPAYMENTS
NET CASH
MOVEMENTS
BALANCE
31-March-24
(1) (2) (3) (4) (5) (6) (7)
LONG-TERM LOANS
PWLB 479,038,272 0 0 100,000,000 (10,637,720) 89,362,280 568,400,552
MONEY MARKET LOANS 54,000,000 0 0 0 0 0 54,000,000
LOBO 3,000,000 0 0 0 0 0 3,000,000
ENERGY EFFICIENCY LOAN 755,600 0 0 0 (26,023) (26,023) 729,577
536,793,872 0 0 100,000,000 (10,663,743) 89,336,257 626,130,129
SHORT-TERM LOANS
TEMPORARY 241,500,000 0 0 68,800,000 (69,500,000) (700,000) 240,800,000
MUNICIPAL BANK 0 0 0 0 0 0 0
INTERNAL LOANS 6,280 0 0 0 0 0 6,280
241,506,280 0 0 68,800,000 (69,500,000) (700,000) 240,806,280
LONG -TERM LIABILITIES
FINANCE LEASE OBLIGATIONS 1,288,579 0 0 0 0 0 1,288,579
LONG TERM LIABILITY 159,852,016 0 0 50,382,960 (2,586,390) 47,796,570 207,648,586
161,140,595 0 0 50,382,960 (2,586,390) 47,796,570 208,937,165
TOTAL EXTERNAL DEBT 939,440,747 0 0 219,182,960 (82,750,133) 136,432,827 1,075,873,574
INVESTMENTS
THIRD PARTY ADVANCES 1,168,251 0 0 0 (10,437) (10,437) 1,157,814
BANKS & OTHER FINANCIAL INSTITUTIONS 58,392,221 0 0 0 0 2,237,939 60,630,160
BANK OVERDRAFT INCL CASH IN TRANSIT 1,653,351 0 0 0 0 (9,231,761) (7,578,410)
CASH & CASH EQUIVALENTS 61,213,823 0 0 0 (10,437) (7,004,259) 54,209,564
NET BORROWING 878,226,924 0 0 219,182,960 82,739,696 143,437,086 1,021,664,010
Page 65 of 142

Page 66

Appendix 2 
Summary of Treasury and Prudential Indicators as at quarter ended 31 March 2024
1. Prudential Indicators
(a) Capital Expenditure Initial
Estimate
2023/2024
(£m)
Projected 
Outturn 
2023/2024 
(£m)
Variance
2023/2024
(£m)
Forecast 
2024/2025 
(£m)
Forecast 
2025/2026 
(£m)
Capital Expenditure: General Services 167.4 134.1 (33.3) 149.5 173.6
Capital Expenditure: HRA 131.0 127.2 (3.8) 154.1 183.9
Total spend : Capital Expenditure 298.4 261.3 (37.1) 303.6 357.5
Total spend : Credit Arrangement 49.3 44.8 (4.5) 88.7 0.3
Total Capital Investment 347.7 306.1 (41.6) 392.3 357.8
Financed By:   
Capital Grants & Other External Contributions 73.7 82.8 9.1 73.0 81.2
Capital from Current Revenue 27.1 21.2 (5.9) 41.5 40.1
Capital receipts 1.0 4.4 3.4 6.2 7.9
Capital receipts transfer to Capital Fund 0.0 (2.9) (2.9) (2.9) (2.9)
CFR : Borrowing - General Services 114.7 75.1 (39.6) 85.6 97.4
CFR : Borrowing - HRA 81.9 80.7 (1.2) 100.3 133.8
Credit Arrangements 49.3 44.8 (4.5) 88.7 0.3
check 0.0 0.0 0.0 0.1 0.0
(b) Capital Financing Requirement (CFR) Initial
Estimate
2023/2024
(£m)
Projected 
Outturn 
2023/2024 
(£m)
Variance
2023/2024
(£m)
Forecast 
2024/2025 
(£m)
Forecast 
2025/2026 
(£m)
General Services 948.5 887.2 (61.3) 1,045.9 1,126.3
HRA 519.5 508.8 (10.7) 595.8 714.5
Total CFR 1,468.0 1,396.0 (72.0) 1,641.7 1,840.8
Movement in CFR 220.9 176.4 245.7 199.1
(c) Gross Debt and the Capital Financing Requirement Initial
Estimate
2023/2024
(£m)
Projected 
Outturn 
2023/2024 
(£m)
Variance
2023/2024
(£m)
Forecast 
2024/2025 
(£m)
Forecast 
2025/2026 
(£m)
Gross Borrowing : Loan Debt 961.5 866.9 (94.6) 1,058.1 1,280.7
Long-term Liabilites 213.5 208.9 (4.6) 293.2 288.8
Gross Debt 1,175.0 1,075.9 (99.1) 1,351.3 1,569.5
Capital Financing Requirement 1,468.0 1,396.0 (72.0) 1,641.7 1,840.8
Prudential Margin 293.0 320.1 27.1 290.4 271.3
(d) Authorised Limit and Operational Boundary Initial
Authorised
Limit
2023/2024
(£m)
Initial
Operational
Boundary
2023/2024
(£m)
Maximum
Borrowing
Level Q4
2023/2024
(£m)
Borrowing 1,350.0 1,300.0 857.7
Other Long-term Liabilities 235.0 235.0 208.9
Total Debt 1,585.0 1,535.0 1,066.6
(e) Proportion of Financing Costs to Net Revenue Stream
Initial
Estimate
2023/2024
(£m)
Projected 
Outturn 
2023/2024 
(£m)
Variance
2023/2024
(£m)
Forecast 
2024/2025 
(£m)
Forecast 
2025/2026 
(£m)
General Fund Loan Charges 34.5 37.5 3.0 41.8 46.2
General Fund Finance Lease/PPP Costs 18.0 17.9 (0.1) 15.2 14.8
General Fund : Capital Financing Costs 52.5 55.4 2.9 57.0 61.0
General Fund : Net Revenue Stream 896.2 896.2 0.0 990.3 988.8
Proportion of Financing Costs to Net Revenue Stream - GF 5.9% 6.2% 0.3% 5.8% 6.2%
Proportion of Financing Costs to Net Revenue Stream
Initial
Estimate
2023/2024
(£m)
Projected 
Outturn 
2023/2024 
(£m)
Variance
2023/2024
(£m)
Forecast 
2024/2025 
(£m)
Forecast 
2025/2026 
(£m)
HRA Loan Charges 28.0 31.1 3.1 35.8 41.2
HRA Finance Lease/PPP Costs 0.3 0.3 (0.0) 0.3 0.3
HRA : Capital Financing Costs 28.4 31.4 3.0 36.1 41.5
HRA : Net Revenue Stream 148.2 148.2 0.0 160.5 167.1
Proportion of Financing Costs to Net Revenue Stream - HRA 19.1% 21.2% 2.0% 22.5% 24.8%
Page 66 of 142

Page 67

Appendix 2 (cont) 
Summary of Treasury and Prudential Indicators as at quarter ended 31 March 2024
2. Treasury Management Indicators
a) Interest Rate Exposures on External Interest Payments Position as at
31/03/2024
(£m) %
External Interest Payable on Fixed Rate Loan Debt 30.8 99.0%
External Interest Payable on Variable Rate Loan Debt 0.3 1.0%
b) Loans Fund Revenue Account Initial
Estimate
2023/2024
(£m)
Projected
Outturn 
2023/2024
(£m)
Variance
2023/2024
(£m) %age
Loans Fund Interest Payments 41.3 49.4 (8.1) (19.6%)
Loans Fund Expenses 0.4 0.4 0.0 7.0%
Total Loans Interest Payments & Expenses 41.7 49.8 (8.1) (19.3%)
Loans Funds Investment Income (1.3) (2.6) 1.3 (100.0%)
Total Loans Fund Interest Payments Investment Income & Expenses 40.4 47.2 (6.8) (16.7%)
Allocated as follows :
Loans Fund Interest Payments Investment Income & Expenses:General Fund 24.0 27.6 (3.6) (14.9%)
Loans Fund Interest Payments Investment Income & Expenses:HRA 16.4 19.6 (3.2) (19.8%)
Capital Advances Repayments -  General Fund 10.5 10.0 0.5 4.7%
Capital Advances Repayments -  HRA 11.7 11.5 0.2 1.5%
Total Capital Advances 22.2 21.5 0.7 3.0%
Total Loan Charges 62.6 68.7 (6.1) (9.7%)
c) Maturity Structure of Borrowing
<12months
12 months to
2 years 2 to 5 years 5 to 10 years
10 to 20
years
20 to 40
years >40 years
Upper Limit maturing :Fixed & Variable Rate Debt 15.0% 15.0% 25.0% 30.0% 35.0% 45.0% 30.0%
Lower Limit maturing :Fixed & Variable Rate Debt 0.0% 0.0% 5.0% 5.0% 5.0% 10.0% 10.0%
Maturity structure at the start of Q3 5.8% 5.0% 14.1% 19.3% 18.7% 32.2% 4.8%
Maturity structure at the end of  Q3 5.7% 5.9% 16.9% 24.6% 15.2% 27.6% 4.1%   
Page 67 of 142

Page 68

Appendix 3 
0
200
400
600
800
1,000
1,200
1,400
1,600
1,800
2023 2025 2027 2029 2031 2033 2035 2037 2039 2041 2043 2045 2047 2049 2051 2053
£m
Liability Benchmark - North Lanarkshire
Fixed rate loans LOBO loans Loans CFR Liability benchmark Net loans requirement
Page 68 of 142

Page 69

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    EK/NL/PF Date 22/05/24 
Revenue Budget Monitoring Report; Chief Executive’s Service
01.04.23 – 01.03.24 (Period 12) 
From  Elaine Kemp, Chief Officer (Finance)  
E-mail KempE@northlan.gov.uk Telephone 01698 302408 
Executive Summary
This report provides a summary of the Chief Executive’s Service financial performance for
the Period 1 April 2023 to 1 March 2024 (Period 12).   The report illustrates the provisional
outturn as at 31 March 2024, with major outturn variances highlighted and explained per
the Council’s approved Financial Regulations. 
The Service is currently forecasting a year end underspend of £6.493m, predominately as
a result of underspends within Employee costs and ICT contracts coupled with an over
recovery of income from HMRC recovering an overpayment of VAT on Sports and Leisure
income and the PPP contribution.  This is a movement of £0.607m since the last report
which is mainly the result of vacancies, further underspends within ICT and over-recoveries
in taxi licensing income and rent allowance / rent rebate overpayments offset by the release
of historic supplier payment debt. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the financial position of the 2023/24 Chief Executive’s Service revenue
budget.  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 9(a)
Page 69 of 142

Page 70

1. Background 
1.1 The Council’s approved Financial Regulations require the Chief Executive to remain
within the approved budgetary provision, and to report all significant deviations -
defined as the higher of £100,000 or 5% - within budget monitoring reports. Where
significant deviations are identified, the Chief Executive must provide explanatory
commentary, outline the action required to rectify such deviations and where relevant,
must also highlight the impact this has on other budget headings. 
2. Report 
Summary of Financial Position 
2.1 The Council approved its General Fund Revenue Budget on 23 February 2023, of
which £93.198m (9.48%) represented the approved Revenue Budget for the Chief
Executive’s Service. In-year transfers from Enterprise and Communities and additional
Discretionary Housing Payment Administration Grant results in a revised budget of
£97.308 m. 
2.2 The overall projected outturn is an underspend of £6.493m.  As detailed in Appendix 2
there are projected underspends within employee costs and ICT contracts, coupled
with an over-recovery of income predominately in relation to VAT recoveries, offset by
overspends in relation to postages and the Apprenticeship Levy. 
2.3 As at period 12 the position on Council Tax Reduction Scheme remains under review
along with other elements of the Council Tax Product including household numbers and
council tax collection for the year.  The Council Tax Product will then be assessed for
expected credit losses as part of the year end process. It is currently anticipated there
will be no material variance overall.   
2.4 The 2023/24 budget incorporates £0.127m savings in relation to Transitional Rates
Relief, which has been fully achieved.  Further information regarding savings is
included in Appendix 5. 
Analysis of Significant Variances 
2.5 The service currently anticipates a projected underspend of £2.724m within Employee
costs as a result of actual and projected vacancies.   
2.6 An underspend of £1.014m is projected within Supplies and Services.  Business and
Digital are reporting a net underspend of £0.972m which represents the continued
savings resulting from current usage levels of the cloud-based systems offsetting an
approved overspend on the investment model spend.  This net underspend is partially
offset by overspends in various other lines across the service. 
2.7 Transport & Plant is projected to underspend by £0.082m as a result of reduced travel
claims following the implementation of hybrid working and within Taxi MOT/plating
budgets. 
2.8 The service is currently anticipating an overspend of £0.693m within Administration
costs predominately due to payment to KPMG for professional fees associated with the
overpayment of Sport and Leisure VAT claim, postages associated with Council Tax,
NDR, Scottish Welfare Fund and Housing Benefits offset by reduced printing,
photocopying costs and release of historic supplier payment debt. 
Page 70 of 142

Page 71

2.9 The Service is currently projecting an overspend of £0.980m within Payments to Other
Bodies due to increased costs associated with Crisis and Community Grants. 
2.10 An overspend of £0.411m is currently projected within Other Expenditure due to
increased costs for the Apprenticeship Levy and Pensioner Fuel Payments. 
2.11  The projected outturn for income is an over-recovery of £4.716m predominately
attributable to the recovery of an historic overpayment of Sport and Leisure VAT
following a successful claim against HMRC, higher than anticipated income in relation
to rent allowances / rent rebates overpayments and increased income against budget
on the volume discount received through the Mears contract, which is in line with
previous years.  These are partially offset by under-recoveries within legal insurance,
licensing and registrars.   
2.12 There are various minor variances across other budget areas resulting in the Service
forecasting a favourable position of £6.493m as at 31 March 2024. 
Earmarked and One-off Reserves 
2.13 In finalising the Council’s draft accounts to 31 March 2023, the service was given
approval to earmark £4.771m of resources to fund key projects and initiatives.  During
the course of the year additional funding of £0.312m has been identified to support the
management and co-ordination of the Programme of Work Boards within Business &
Digital, resulting in a revised balance of £5.083m.  This has been profiled as £4.744m
required in 2023/24 with the balance of £0.339m in future years.  
2.14 It is anticipated that of the current year allocation, £3.148m of the reserves balances
will be utilised in 2023/24 with £1.064m slipping for use in future years and a balance
of £0.151m of reserves to be returned.  Details of the Service’s earmarked funds are
provided in Appendix 4. 
2.15  The Service has incurred £0.228m severance costs relating to previous year
savings/restructures.  Therefore, there is a requirement to utilise the Corporate Change
Management fund at this time.  Any further costs arising will be reported in future
reports as they are incurred.  These costs are not included in the Service outturn
position. 
2023/24 Budget Savings 
2.16 The Council approved savings of £0.127m savings in relation to Transitional Rates
Relief, which has been fully achieved.  Further information regarding savings is
included in Appendix 5. 
Management Actions 
2.17 The Service is being pro-active to ensure expenditure is contained within its approved
2023/24 budget. 
3. Measures of success 
3.1  The Service continues to operate within approved budget resources.   
4. Supporting documentation 
Appendix 1 Objective Summary
Page 71 of 142

Page 72

Appendix 2 Subjective Summary
Appendix 3 Payments to Other Bodies
Appendix 4 Earmarked Reserves
Appendix 5 Budget Savings 
Elaine Kemp
Chief Officer (Finance) 
Page 72 of 142

Page 73

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
As stated in the main body of the report. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 73 of 142

Page 74

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
All activities undertaken by the Council are subject to risk, and in acknowledging the
Council’s approved Risk Management Strategy, Services manage these as part of
their overall corporate and service planning processes. The current economic
climate, in particular, has the potential to impact upon the Council’s ability to provide
quality services within approved budget levels. 
Reflecting the risk analysis matrix included within the Risk Management Strategy,
the Service considers delays or amendments to savings proposals could present an
ongoing risk to the financial outturn for 2023/24. 
To minimise risk this report has been prepared by service based Finance
personnel in consultation with budget managers, in accordance with the Financial
Regulations. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 74 of 142

Page 75

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 75 of 142

Page 76

APPENDIX 1
[1] [2] [3] [5] [6] [7]
DIRECTORATE & SUPPORT 426,563 354,780 71,783 FAV 16.8% 7,819 Underspend in Employee costs primarily due to implementation of
Support Services Review.
FINANCE 45,962,667 46,218,935 (256,268) ADV (0.6%) (894,293)
Increased costs associate with Crisis and Community Grants,
postages, agency fees and release of supplier payment debt partially
offset by an over-recovery in income from Rent Allowances and Rent
Rebate overpayments plus underspends associated with vacancies,
ICT, printing and travel.
AUDIT & RISK 655,200 596,354 58,846 FAV 9.0% (2,002) Underspends within Employee costs as a result of vacancies.
LEGAL & DEMOCRATIC
SOLUTIONS 2,868,773 2,523,187 345,586 FAV 12.1% 324,533
Under-recovery in income within insurance, licensing, registrars plus
overspends in relation to building costs and net position for printing
and postages offset by underspends within employee costs, Taxi
MOT and plating, advertising and training.
BUSINESS & DIGITAL 22,954,512 21,410,662 1,543,850 FAV 6.7% 32,570
Underspends within ICT contracts linked to the timing of costs
associated with cloud based systems, vacancies and the over-
recovery of income associated with the recycling of IT Equipment
offset by costs in relation to the Investment Model and other services.
PEOPLE RESOURCES 9,111,393 8,604,549 506,844 FAV 5.6% 220,011
Net underspend associated with MA programme plus underspends
within Employee costs and an over-recovery of income for services
provided to Midlothian Council.
STRATEGIC COMMUNICATIONS 5,611,422 5,507,402 104,020 FAV 1.9% 73,199 Underspend predominately as a result of vacancies.
OTHER COPORATE SERVICES (4,320,129) (8,438,367) 4,118,238 FAV (95.3%) 844,749
Over-recovery attributable to HMRC for Sports and Leisure Services
VAT, PPP Contribution and NLP Financial Guarantee offset by
projected overspend relating to MA Levy.
JOINT BOARDS 14,037,909 14,037,909 0 0.0% 0
NET EXPENDITURE 97,308,310 90,815,412 6,492,899 FAV 6.7% 606,586
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Objective Analysis
Period 12 (01 April 2023 - 01 March 2024)
A - Chief Executives Service
DIVISION OF SERVICE ANNUAL
BUDGET
PROJECTED
OUT-TURN
PROJECTED OUT-
TURN VARIANCE %
[4]
PERIOD
MOVEMENT ANALYSIS
Page 76 of 142

Page 77

APPENDIX 2
[1] [2] [3] [5] [6] [7]
EMPLOYEE COSTS 47,252,821 44,528,406 2,724,415 FAV 5.8% 409,939 Underspends due to vacancies, overtime and pensions.
PROPERTY COSTS 2,417,052 2,446,529 (29,477) ADV (1.2%) 9,382 Minor variance
SUPPLIES & SERVICES 10,735,390 9,721,348 1,014,042 FAV 9.5% 107,500
Underspend within B&D represents continued savings from current
usage levels of cloud based systems offsetting an approved overspend
on the investment model and various other lines across the service.
TRANSPORT & PLANT 202,407 120,458 81,949 FAV 40.5% 16,934 Hybrid working has resulted in reduced travel claims plus underspends
within Taxi MOT and plating.
ADMINISTRATION COSTS 5,690,234 6,383,067 (692,833) ADV (12.2%) (512,252)
Professional fees associated with Sports and Leisure Services VAT
claim to HMRC plus postage costs for Council Tax, NDR, Scottish
Welfare Fund and Housing Benefits offset by reduced printing,
photocopying costs and release of supplier payment debt.
PAYMENTS TO OTHER BODIES 18,406,241 19,386,507 (980,266) ADV (5.3%) (991,241) Increased costs associated with Crisis and Community Grants.
TRANSFER PAYMENTS 106,643,538 106,643,538 0 0.0% 0
CAPITAL FINANCING COSTS 5,048,700 4,978,400 70,300 FAV 1.4% 0 Over-recovery attributable NLP Financial Guarantee following re-
financing in October 2023.
REVENUE FINANCING COSTS 0 0 0 0.0% 0
OTHER EXPENDITURE 3,867,025 4,278,264 (411,239) ADV (10.6%) (57,721) Overspend in relation to Apprenticeship Levy partially offset by historic
underspends within miscellaneous costs.
TOTAL EXPENDITURE 200,263,408 198,486,517 1,776,891 FAV 0.9% (1,017,459)
INCOME (102,955,097) (107,671,105) 4,716,008 FAV (4.6%) 1,624,045
Over-recovery attributable to HMRC for Sports and Leisure Services
VAT, higher than anticipated income in relation to rent allowances / rent
rebates overpayments and increased income against budget on the
volume discount received through the Mears contract, which is in line
with previous years, offset by under-recoveries within legal insurance,
licensing and registrars.
NET EXPENDITURE 97,308,310 90,815,412 6,492,899 FAV 6.7% 606,586
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Subjective Analysis
Period 12 (01 April 2023 - 01 March 2024)
A - Chief Executives Service
CATEGORY ANNUAL BUDGET PROJECTED
OUT-TURN
PROJECTED OUT-
TURN VARIANCE %
[4]
PERIOD
MOVEMENT ANALYSIS
Page 77 of 142

Page 78

APPENDIX 3
[1] [2] [3] [5] [6] [7]
PAYMENTS TO OTHER BODIES GENERAL 347,822 349,364 (1,542) ADV (0.4%) (1,542) Minor variance 
MEDICAL FEES 9,859 12,694 (2,835) ADV (28.8%) (2,600) Minor variance 
AGENCY FEES 98,542 111,193 (12,651) ADV (12.8%) 893 Recruitment agency costs which are being offset by
vacancies within Employee Costs
TOWN TWINNING 0 0 0 0.0% 0
CHILDRENS PANEL 25,035 17,774 7,261 FAV 29.0% (739) Lower than anticipated costs associated with training
COSLA ANNUAL LEVY 195,000 193,434 1,566 FAV 0.8% 0 Minor variance 
COMMUNITY COUNCIL GRANTS 158,629 152,094 6,535 FAV 4.1% 6,535 Minor variance 
GRANTS TO ORGANISATIONS 848,480 840,601 7,879 FAV 0.9% 7,879 Minor variance 
EXTERNAL AUDIT FEE 529,389 529,389 0 0.0% 0
ELECTION PROVISION 0 0 0 0.0% 0
TOURISM - VISIT NORTH LANARKSHIRE 43,252 43,252 0 0.0% 0
SCOTTISH WELFARE FUND 4,277,844 5,277,844 (1,000,000) ADV (23.4%) (1,000,000) Increased costs associate with Crisis and
Community Grants.
SUB-CONTRACTOR PAYMENTS 1,869 0 1,869 FAV 0.0% 369 Minor variance 
LOCAL TAX PAYPOINT COMMISSION 35,000 22,911 12,089 FAV 34.5% (1,599) Anticipated costs within Council Tax Collection lower
than budget
COSLA MIGRATION SCOTLAND 150,000 150,000 0 0.0% 0
LANDS VALUATION CONTRIBUTION 2,004,360 2,004,360 0 0.0% 0
SPT CONTRIBUTION 5,527,992 5,527,992 0 0.0% 0
SPT CONCESSIONARY FARES CONTRIBUTION 582,557 582,557 0 0.0% 0
CUSTOMER FIRST CONTRIBUTION 4,100,000 4,100,000 0 0.0% 0
TOTAL EXPENDITURE 18,935,630 19,915,458 (979,829) ADV (5.2%) (990,804)
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Payments to Other Bodies
Period 12 (01 April 2023 - 01 March 2024)
A - Chief Executives Service
CATEGORY ANNUAL BUDGET
[4]
PROJECTED OUT-TURN
VARIANCE
PROJECTED OUT-
TURN % PERIOD
MOVEMENT ANALYSIS
Page 78 of 142

Page 79

APPENDIX 4
Value %
Service Specific Earmarked Reserves:
Administration of Covid and Cost of Living related support scheme 25,000 25,000 13,081 25,000 100.0% 0 0 25,000
Pensioners Fuel Grant Payment 38,247 38,247 38,247 38,247 100.0% 0 0 38,247
Cost of Living Grant 310,593 310,593 274,377 286,593 92.3% 24,000 0 286,593
DHP Additional Admin (Benefits Cap) 35,313 35,313 35,313 35,313 100.0% 0 0 35,313
Modern Apprentices 86,000 (43,000) 43,000 8,457 10,000 23.3% 33,000 0 10,000
1fte appointed Summer intake, 1 fte appointed Winter
intake, balance required for 2024/25 to fund additional
2fte
Scottish Welfare Fund 1,518,000 1,518,000 1,518,000 1,518,000 100.0% 0 0 1,518,000
Digitisation 771,381 771,381 470,761 671,381 87.0% 100,000 0 671,381
One-off resourcing following insourcing of CLNL 18,557 18,557 12,589 12,589 67.8% 0 5,968 12,589 Balance has been idenitifed as no longer being
required as staff member has resigned from post.
One-off resourcing following insourcing of CLNL (ICT Development) 84,704 84,704 24,997 24,997 29.5% 0 59,707 24,997 Balance no longer required as ICT Development has
been completed
B&D - NLC10 posts 99,132 99,132 70,260 85,745 86.5% 13,387 0 85,745 Balance required in 2024/25 to support ongoing
commitments.
B&D - NLC 12 post 312,055 (296,452) 15,603 5,201 33.3% 10,402 0 5,201
Funding approved at Sept WSCG, assume that post
will be filled from March.  Balance required in future
years.
Learning Academy 100,000 100,000 0.0% 100,000 0 0
Construction Academy 300,000 300,000 37,359 92,809 30.9% 207,191 0 92,809
Resources 63,000 63,000 91,010 63,000 100.0% 0 0 63,000
One-off resourcing following insourcing of CLNL 109,608 109,608 106,340 109,608 100.0% 0 0 109,608
ESC Staffing 109,840 109,840 85,097 109,840 100.0% 0 0 109,840
CSH (NLC16 and NLC11 post) 141,616 141,616 126,250 141,616 100.0% 0 0 141,616
Recover NL - CSH extension of staff 172,521 172,521 87,725 87,725 50.9% 84,796 0 87,725
CSH Recover NL 2022/23 (Single Number) 489,218 489,218 31,357 31,357 6.4% 457,861 0 31,357
Cumbernauld Theatre 35,000 35,000 0.0% 0 35,000 0 The group had advised the service that this funding
was not required.
Recover NL Grants 172,294 172,294 120,867 172,294 100.0% 0 0 172,294
Cost of Living Grant 41,242 41,242 4,360 7,700 18.7% 33,542 0 7,700
Councillor Surgeries 50,000 50,000 0.0% 0 50,000 0
Council (Mar 2023) approved advertising of surgeries
via the Council's exisiting social media channels and
websites.
SUB-TOTAL 5,083,321 (339,452) 4,743,869 3,156,448 3,529,015 74.4% 1,064,179 150,675 3,529,015
Delays in the implementation of the single number
contact point in the Customer Service Hub has
resulted in a requirement to reprofile this reserve to
future years.
The service has supported costs for all areas from
the total approved allocation.
Reprofile to
Future Years
No Longer
Required
Reserves
Required In
Year
Commentary Regards Usage
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Status of Earmarked Reserves
Period 12 (01 April 2023 - 01 March 2024)
A - Chief Executives Service
FINANCIAL YEAR - 2023/24
DESCRIPTION OF EARMARKED RESOURCE
Reserve
Allocation
2023/24
Profiled in
Future Years
Approved
Reserve
Total
Spend to
Date
Projected Spend
Page 79 of 142

Page 80

APPENDIX 5
£000 £000 £000
CEBB01 Removal of Residual Transitional Rates
Relief Budget
127 127 0
TOTAL 127 127 0
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Savings
Period 12 (01 April 2023 - 01 March 2024)
A - Chief Executives Service
APPROVED SAVINGS
Ref. DESCRIPTION OF APPROVED SAVING Target Value Value
Deliverable Savings Gap Reasons for Savings Gap
Page 80 of 142

Page 81

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    EK/KS/FC Date 22/05/24 
Revenue Monitoring Report Council Summary
1 April 2023 to 01 March 2024 
From  Elaine Kemp, Chief Officer (Finance)  
E-mail KempE@northlan.gov.uk Telephone 07939 280601 
Executive Summary
This report updates on the overall financial position for the General Fund Account, Housing
Revenue Account and Adult Health and Social Care, for the financial year to 31 March
2024.  The report consolidates the budget monitoring position of all Services, highlighting
and explaining major variances as per the Council’s approved Financial Regulations. 
The Council approved its General Fund Revenue Budget on 23 February 2023.  Following
notification from Scottish Government of further funding made available to local authorities
the budget has been revised to £950.954m.  A surplus of £17.412m against this budget is
currently projected. However, as previously advised this includes a net one-off financial
benefit from loan charges.  Following a review of the medium-term forecast of loan charges
and interest on revenue balances, reflecting the impact of capital programme profiles,
higher interest rates, previous one-off debt re-profiling and forecast use of balances, the
review highlights a forecast net overspend of £5.220m and £4.509m for financial years
2025/26 and 2026/27, respectively.  Therefore, it is proposed that £9.279m of one-off
resources is earmarked as a one-off solution, to help smooth the impact of such variances
in the coming years.  This position will be kept under review to assess if any further one-
off or recurring budget solutions are required for this purpose, which will be managed as
part of the year end process and if required considered within the Medium Term Financial
Plan.  The resulting underlying surplus against budget is £8.133m, which is a £0.607m
increase from period 10. 
The 2023/24 budget incorporates £7.486m of net savings. It is projected that £7.418m of
the savings (99%) will be delivered within the financial year, with replacement savings of
£0.068m identified to fully address the shortfall.
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the financial position of the 2023/24 revenue budget; and
(2) Otherwise endorse the contents of this report. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Item 9(b)
Page 81 of 142

Page 82

1. Background 
1.1 The Council’s approved Financial Regulations require services to remain within their
approved budgetary provision, and to report all significant deviations - defined as the
higher of £100,000 or 5% - within their budget monitoring reports.  Where significant
deviations are identified, services must provide explanatory commentary, outline the
action required to rectify such deviations and where relevant, must also highlight the
impact this has on other budget headings. 
2. Report 
2.1 At its meeting of 23 February 2023, the Council approved a General Fund Revenue
Budget of £978.624m which included spend offset by ring fenced grants of £50.586m
and capital grant funding in lieu of pay award funding of £7.726m.  Additional funding
has since been confirmed as part of the Scottish Government budget setting together
with a number of redeterminations, including additional directed funding for pay awards,
resulting in an overall total budget of £950.954m. 
2.2 Following the budget setting in February the Council has an approved savings target
of £7.486m for 2023/24.  Further detail can be found in Section 2.10 below. 
2.3 Table 1 below summarises the projected income and expenditure position, which
illustrates a projected surplus of £17.412m, with £9.279m to be used to manage future
loan charges budget pressures, resulting in a remaining unallocated surplus of
£8.133m. 
Annual 
Budget
(£m)
Projected
Outturn
(£m)
P12
Variance
(£m)
P10
Variance
(£m)
P10 to P12
Movement
(£m)
Expenditure     
Total Expenditure 950.954 933.542 17.412 16.805 0.607
Income     
Aggregate External Finance   761.830   761.830 - - -
Additional SG Pay award funding 4.600 4.600 - - -
Local Tax Collection   166.849   166.849 - - -
Use of Balance   17.675 17.675 - - -
Total Income   950.954   950.954 - - -
Projected variance:
Surplus/(Deficit) at 31 March 2024 - 17.412 17.412 16.805 0.607
Earmarked for future budget
pressures (loan charges/IORB) - 9.279 9.279 9.279 -
Surplus/(Deficit) at 31 March 2024  - 8.133 8.133 7.526 0.607
Table 1 
Programme of Work Statutory / corporate / service requirement
Page 82 of 142

Page 83

Analysis of Significant Variations 
2.4 Table 2 below illustrates the projected outturn financial position of services:
Service P12 Outturn
(£m)
P10 Outturn
(£m)
P10 to P12
Movement
(£m)
Education, Children and Families - On Budget - On Budget -
Enterprise and Communities 2.335 Underspend 2.335 Underspend -
Chief Executives and Other
Corporate Services 6.493 Underspend 5.886 Underspend 0.607
Social Work (Non-Integrated) - On Budget - On Budget -
Executive Services Total 8.828 Underspend 8.221 Underspend 0.607
Financing Costs 8.584 Underspend 8.584 Underspend -
Budget Assumptions - On Budget - On Budget -
Total Projected
Surplus/(Deficit) 17.412 Underspend 16.805 Underspend 0.607
Earmarked for future budget
pressures (9.279) Overspend (9.279) Overspend -
Total 8.133 Underspend 7.526 Underspend 0.607
Table 2 
2.5 As reported in previous periods Education Children and Families is reporting a
breakeven position overall, however it should be noted that there are a number of
compensating variances within this position. Employee costs are forecast to
underspend by £4.251m, largely due to phasing of posts supported by external funding
together with vacancy management, an underspend of £0.867m within administration
costs, and £0.952m underspend within payments to other bodies primarily in relation
to demand led expenditure within Children & Families and underspends in relation
external placements within fostering / adoption fees and allowances.  This is primarily
offset by an overspend in transport costs of £2.629m arising from ASN and Gaelic
service delivery and increased market prices together with an under-recovery in income
of £3.144m primarily in relation to membership fees and site admissions within the
Active & Creative Communities estate of £2.055m and projected loss in income of
£0.485m due to the closure of Motherwell Concert Hall and Theatre. The overall
position includes a net overspend of £0.392m in relation to the closure of Motherwell
Concert Hall and Theatre due to a projected loss in income of £0.485m noted above,
partly offset by reduced expenditure of £0.093m. This compares to a budgeted full year
subsidy of £0.249m. The final overspend is subject to the development of service
operational plans, including the move of the pantomime to Ravenscraig. 
2.6 Enterprise and Communities is reporting a projected underspend of £2.335m.  This is
primarily as a result of employee vacancy savings across the service of £4.630m, and
an over-recovery in income of £0.980m mainly due to one-off grant income and
increased paid school meal income offset by reduced capital recharges and reduced
trade waste income. This is partially offset by an overspend of £1.382m mainly as a
result of agency fees due to difficulties in recruitment and increased roads contractor
costs, increased supplies and services costs of £0.623m mainly due to increased fleet
external hire and agency costs within waste, increased administration costs of £0.703m
Page 83 of 142

Page 84

as a result of increased consultancy costs linked to difficulties in recruitment, and
increased transport costs of £0.690m due to increased fleet repair costs. 
2.7 Chief Executives and Other Corporate Services is reporting a projected underspend of
£6.493m, an increase of £0.607m from previously reported.  This is largely due to a
projected underspend of £2.724m within employee costs as a result of vacancies, and
a £1.014m underspend within supplies and services mainly due to continued savings
resulting from current usage levels of the cloud-based systems.  There is also a net
over-recovery in income of £4.716m primarily as a result of a successful historical VAT
claim of £2.411m, following years of legal proceedings by HMRC, in respect of the VAT
treatment of sport and leisure income, along with higher than anticipated rent
allowances/ rebates overpayments and volume discount recoveries in relation to the
repairs and maintenance contract.  These are partially offset by increased costs
associated with crisis and community grants (£0.980m), administration costs (£0.693m)
primarily due to payment to KMPG for professional fees associated with VAT claim,
and an overspend of £0.411m in other expenditure mainly in relation to the
apprenticeship levy.   
2.8 As previously reported, a review earlier in the year of the medium term forecast on loan
charges and interest on revenue balances highlighted an estimated net financial benefit
at that time of £8.584m. The review also highlighted, forecast material overspends of
£5.221m and £4.509m for financial years 2025/26 and 2026/27, respectively.  The
modelling also shows a forecast overspend against current planned budgets into
2027/28.  This position is primarily due to a net increase in the cost of loan charges for
capital expenditure, partially offset by an over recovery on interest earned on revenue
balances.  The forecast contains some complex and highly volatile variables, therefore
there are a number of reasons for such material variances including the impact of;
higher interest rates on the cost of new borrowings, previously approved one-off debt
re-profiling savings, and the increased forecast cost of use of balances in lieu of
borrowing.  Due to the variability in the forecast it is currently proposed that £9.279m
of the overall 2023/24 underspend is earmarked as a one-off solution, to help smooth
the impact of the variances over the short term. This position will be kept under review
to assess if any further one-off or recurring budget solutions are required for this
purpose, which will be managed as part of the year end process and if required
considered within the Medium Term Financial Plan.   
2.9 It should also be noted that as at period 12 the Council Tax Product remains under
consideration. This includes consideration of Council Tax collection, Council Tax
Reduction Scheme up take and household numbers. In addition, the Council Tax
Product will then be assessed for Expected Credit losses as part of the year end
process. 
2023/24 Budget Savings 
2.10 As outlined in paragraph 2.2 above, the Council has approved net savings of £7.486m
for 2023/24.  Each Service reports on the achievement of their savings within the
relevant service monitoring report.  It is projected that £7.418m of savings (99%) will
be achieved in the current year, with the in-year gap of £0.068m being fully mitigated
by replacement savings. 
Earmarked Reserves and Change Management Fund 
2.11 The Council’s audited annual accounts highlight a General Fund reserve balance of
£249.872m.  This balance includes £8.000m for the Contingency Fund, with a further
£202.845m earmarked for specific future commitments including £28.115m allocated
Page 84 of 142

Page 85

to the Change Management Fund to support future budget pressures, one-off costs of
existing approved savings and to ensure the Council has a resilient and sustainable
financial plan. The remaining £39.027m of funds represent balances that were
unallocated as at 31 March 2023.  A total of £0.422m has subsequently been allocated
for posts to facilitate the transition to iTrent recruitment (£0.110m) and funding to
support the management and co-ordination of the Programme of Work Boards within
Business and Digital (£0.312m).  This results in a revised earmarked reserve balance
of £203.267m, and unallocated balances of £38.605m. 
2.12 A total of £97.428m of earmarked reserves is profiled for use in 2023/24 with a further
£105.839m profiled for use in future years. It is currently projected that £91.615m will
be spent during this financial year with £111.391m anticipated to be required in future
years, leaving reserves deemed no longer required of £0.261m. A summary position is
shown in Appendix 2.  As detailed in Appendix 3 there are a number of movements on
the unallocated balances, namely the projected surplus of £8.133m, earmarked
reserves no longer required as noted above, use of reserves of £4.719m approved to
support the budget due to the phasing of the 2024/25 savings, and an increase to the
Change Management Fund of £4.500m as highlighted within the Revenue Budget
paper presented to Council in February 2024. Taking account of these, it is expected
that at the end of the financial year the General Fund will include unallocated balances
of £37.780m.  The final unallocated balance as at 31 March 2024 will be reported in the
annual accounts.  These balances will be available to support future budget challenges
in accordance with the approved reserves policy, and any budget smoothing strategy
recommended by the S95 Officer. 
Risks and Uncertainty 
2.13 All activities undertaken by the Council are subject to risk, and in acknowledging the
Council’s approved Risk Management Strategy, Services manage these as part of their
overall corporate and service planning processes.  The current economic climate and
pay and non-pay inflation continuing at historically high levels, are some of the key
factors that have the potential to impact upon the Council’s ability to provide quality
services within approved budget levels. 
Housing Revenue Account 
2.14 The Housing Revenue Account is currently projecting an overspend of £3.383m for the
financial year, a favourable movement of £0.422m from the previously reported
position. This is as primarily as a result of overspends in property costs of £6.377m
primarily linked to increased costs associated with repairs, and increased loan charge
costs of £3.383m reflecting impact of higher interest rates. These overspends are
partially offset by an underspend in employee costs of £1.898m mainly due to
vacancies, reduced revenue contribution to capital programme resulting in £2.085m
underspend in CFCR, £0.732m underspend within other costs due to the release of
Ambition funding not required in the current financial year, an underspend of £0.500m
as a result of lower than anticipated IT recharges, underspend in administration costs
of £0.352 due to decreased legal and sheriff officer fees and an over-recovery in income
of £0.810m primarily due to increased interest on revenue balances associated with
increased market rates (£0.448m), increased mainstream rental income (£0.167m) and
increased contributions towards affordable housing through the Council Tax Levy
(£0.357m).  It is anticipated that £0.070m of savings (100%) will be delivered by the
year end. 
Page 85 of 142

Page 86

Adult Health and Social Care 
2.15 Council Adult Health and Social Care provision to the Integration Joint Board (IJB) is
projecting an underspend of £2.726m.  This position is primarily due to a projected
underspend in employee costs of £3.406m as a result of slippage in recruitment, and
lower than anticipated spend in administration costs of £0.832m in relation to carers
budgets. This is partly offset by a projected overspend of £1.217m in payments to other
bodies and transfer payments primarily in relation to the care at home sector who
provide services to individuals via the SDS commissioning framework, and in transport
and plant of £0.248m mainly due to higher than anticipated costs in relation to staff
mileage, coupled with estimated running costs associated with vehicles for use across
the Service. This overall position reflects an adverse movement of £0.386m from that
shown at period 10, mainly due to additional employee costs anticipated as a result of
recruitment, and payments in relation to private sector housing grants. 
3. Measures of success 
3.1 The Council continues to operate within approved budgeted resources.   
4. Supporting documentation 
Appendix 1 Summary by Division
Appendix 2 Anticipated Commitments – Earmarked Reserves
Appendix 3 Availability of One-Off Funds – Change Management Fund 
Elaine Kemp
Chief Officer (Finance) 
Page 86 of 142

Page 87

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 87 of 142

Page 88

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 88 of 142

Page 89

LINE SERVICE  ACCOUNT ANNUAL PROVISIONAL
NO. BUDGET OUTTURN
(1) (2) (3) (4)
£      £      £     
1 Education, Children & Families 530,685,347                530,685,347               -                               
2 Early Years 37,556,143                  37,556,143                 -                               
3 Primary Schools 159,885,874                159,885,874               -                               
4 Secondary Schools 144,465,041                144,465,041               -                               
5 Special Schools 25,619,775                  25,619,775                 -                               
6 Education & Families Service Delivery 76,780,410                  77,566,015                 (785,605 )                  
7 Childrens Services Social Work 43,870,370                  41,621,869                 2,248,501                
8 Justice Services 92,400                         236,884                      (144,484 )                  
9 Active and Creative Communities 29,994,200                  31,735,233                 (1,741,033 )               
10 Employability 5,138,981                    4,858,313                   280,668                   
11 Community Learning 5,143,955                    4,946,449                   197,506                   
12 Tackling Poverty 2,138,198                    2,193,751                   (55,553 )                    
13 Enterprise & Communities 159,550,697                157,215,771               2,334,926                
14 Assets & Procurement 44,755,010                  44,370,670                 384,340                   
15 Trading Accounts (462,202 )                      23,842                        (486,044 )                  
16 Community Operations 91,777,593                  91,550,499                 227,094                   
17 Housing Management 5,918,152                    5,241,882                   676,270                   
18 Housing Property Services 8,678,438                    8,007,881                   670,557                   
19 Place 8,883,706                    8,020,997                   862,709                   
20 Chief Executives & Other Corporate Services 97,308,310                  90,815,411                 6,492,899                
21 Directorate & Support 426,563                       354,780                      71,783                     
22 Finance 45,962,667                  46,218,935                 (256,268 )                  
23 Audit & Risk 655,200                       596,354                      58,846                     
24 Legal & Democratic 2,868,773                    2,523,187                   345,586                   
25 Business & Digital 22,954,512                  21,410,662                 1,543,850                
26 People Resources 9,111,393                    8,604,549                   506,844                   
27 Strategic Communication and Engagement 5,611,422                    5,507,402                   104,020                   
28 Other Corporate Services (4,320,129 )                   (8,438,367 )                  4,118,238                
29 Joint Boards 14,037,909                  14,037,909                 -                               
30 Social Work (non Integrated) 196,549,889                196,549,889               -                               
31 GENERAL FUND SERVICES 984,094,243                975,266,418               8,827,825                
32 FINANCING COSTS (44,490,145 )                 (53,074,145 )                8,584,000                
33 Reversal of Capital Charge (77,069,073 )                 (77,069,073 )                -                               
34 Loan Charges and Interest on Revenue Balances 32,578,928                  23,994,928                 8,584,000                
35 OTHER BUDGETARY ISSUES 11,349,936                  11,349,936                 -                               
36 Assumptions not yet Realised 11,349,936                  11,349,936                 -                               
37 TOTAL EXPENDITURE 950,954,034                933,542,209               17,411,825              
38 SOURCES OF FUNDING 950,954,034                950,954,034               -                               
39 Aggregate External Finance 761,829,569                761,829,569               -                               
40 Additional SG Pay award funding 4,600,000                    4,600,000                   -                               
41 Council Tax 166,849,465                166,849,465               -                               
42 Use of balances 17,675,000                  17,675,000                 -                               
43 (SURPLUS) / DEFICIT -                                   (17,411,825 )                17,411,825              
44 Earmarked for Future Budget Pressures (loan charges/
IORB)
-                                   9,279,000                   (9,279,000 )               
45 (SURPLUS) / DEFICIT -                                   (8,132,825 )                  8,132,825                
46 HOUSING REVENUE ACCOUNT (SURPLUS) / DEFICIT -                                   3,383,000                   (3,383,000 )               
47 ADULT HEALTH AND SOCIAL CARE (SURPLUS) /DEFICIT -                                   (2,726,026 )                  2,726,026                
Appendix  1
NORTH  LANARKSHIRE COUNCIL
SUMMARY BY DIVISION FOR PERIOD ENDING 1 March 2024 (PERIOD 12)
PROVISIONAL
VARIANCES
Page 89 of 142

Page 90

Appendix 2
Total Total
Opening
Reserve
Balances 
In-Year
Adjustment 
Revised
Reserve
Balance 
2023/24
Revised
Earmarked
Reserve 
23/24
Projected
Spend 
Anticipated
Year End
Balance 
Anticipated
Future Year
Use 
No Longer
Required 
Profiled
for Future
Years 
Anticipated
Future Year Use 
No Longer
Required 
No Longer
Required
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000
Change Management Fund 28,115       -                  28,115       12,840         12,840       -                   -                   -                15,275       15,275                -                -                   
Earmarked & One Off Resources
Schools Future Contractual Obligations 56,684       -                  56,684       -                  -                -                   -                   -                56,684       56,684                -                -                   
2023/24 - 2024/25 Budget One-off Use of Balances
21,075       -                  21,075       17,675         17,675       -                   -                   -                3,400         3,400                  -                -                   
Strategic Workforce Planning 13,000       -                  13,000       13,000         13,000       -                   -                   -                -                -                         -                -                   
Temporary Teachers 10,928       -                  10,928       9,928           9,928         -                   -                   -                1,000         1,000                  -                -                   
Temporary Accommodation 9,288        -                  9,288         -                  -                -                   -                   -                9,288         9,288                  -                -                   
Early Years & Childcare Expansion 7,312        -                  7,312         3,000           3,000         -                   -                   -                4,312         4,312                  -                -                   
Refugee Resettlement Programmes 5,699        -                  5,699         2,146           2,146         -                   -                   -                3,553         3,553                  -                -                   
Loans Charges - one-off mitigation 5,000        -                  5,000         -                  -                -                   -                   -                5,000         5,000                  -                -                   
Non-Pay Inflation Mitigation 4,902        -                  4,902         4,902           4,902         -                   -                   -                -                -                         -                -                   
Unmanaged burdens within Education, Children &
Families
4,755        -                  4,755         4,023           4,023         -                   -                   -                732            732                     -                -                   
Other E&C Service developments 4,184        -                  4,184         3,484           1,399         2,085            2,085            -                700            700                     -                -                   
Pupil Equity Fund 3,851        -                  3,851         3,851           3,851         -                   -                   -                -                -                         -                -                   
Balances held by Schools under Devolved School
Management
3,724        -                  3,724         3,724           3,724         -                   -                   -                -                -                         -                -                   
Economic Recovery 3,554        -                  3,554         3,454           3,436         18                 -                   -                100            100                     -                -                   
Whole Family Wellbeing 2,584        -                  2,584         584             584            -                   -                   -                2,000         2,000                  -                -                   
Winter Reserve 1,500        -                  1,500         1,500           -                1,500            1,500            -                -                -                         -                -                   
Business Gateway and Business Recovery 1,379        -                  1,379         899             899            -                   -                   -                480            480                     -                -                   
Rapid Rehousing 1,081        -                  1,081         1,081           1,081         -                   -                   -                -                -                         -                -                   
Other Earmarked Funds 14,230       422              14,652       11,337         9,127         2,210            1,967            261            3,315         3,315                  -                261               
Earmarked & One Off Resources Total 174,730     422              175,152     84,588         78,775       5,813            5,552            261            90,564       90,564                -                261               
Total Reserves 202,845     422              203,267     97,428         91,615       5,813            5,552            261            105,839     105,839              -            261               
Contingency Reserve 8,000        -              8,000        
Unallocated Balance 39,027       422-              38,605      
General Fund Surplus at 31 March 2023 249,872     -              249,872    
NORTH LANARKSHIRE COUNCIL
ANTICIPATED COMMITMENTS AGAINST EARMARKED RESERVES AS AT 1 March 2024 (PERIOD 12)
2023/24 Future Years
Page 90 of 142

Page 91

Appendix 3
£000 £000
Total Balance B/f per 2022/23 Annual Accounts 28,115 39,027
Approved commitments (422)
28,115 38,605
Period 12 reported variance 8,133
Earmarked Reserves no longer required 261
Total Balance 2023/24 before commitments 28,115 46,999
Revised one - off costs of approved savings (12,840)
Change Management Fund Topup 4,500 (4,500)
Earmarking for delay in implementation of 2024/25 savings (4,719)
Total Balance 2023/24 19,775 37,780
Known Commitments :- Revised one - off costs of approved savings (475)
Estimated future Capital Fund Drawdown to 2024/25 3,968
Forecast Balance 19,300 41,748
NORTH  LANARKSHIRE COUNCIL
AVAILABILITY OF GENERAL FUND BALANCES AS AT 1 March 2024 (PERIOD 12)
Change Management
Fund
Unallocated General
Fund
Page 91 of 142

Page 92

Page 92 of 142

Page 93

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    EK/NL/PF Date 22/05/24 
Chief Executive Service – Capital Monitoring Report 1 April to 01
March 2024 (Period 12) 
From  Elaine Kemp, Chief Officer (Finance)  
E-mail KempE@northlan.gov.uk Telephone 01698 302408 
Executive Summary
This report highlights the financial performance and projected outturn of 2023/24 Chief
Executive capital programme for the period ended 1 March 2024 (Period 12). 
In summary the Service has a total capital budget of £13.639m, comprising of £9.984m
within Business and Digital and £3.655m within Strategic Communications and
Engagement.  This budget reflects the budget approved by the Policy and Strategy
Committee in March 2023, balances carried forward from previous years and in-year
adjustments. 
The Service is currently projecting an underspend of £4.074m at this stage of the financial
year. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Considers the financial position of the 2023/24 Chief Executive capital programme.  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 10(a)
Page 93 of 142

Page 94

1. Background 
1.1 This report provides a summary of the Chief Executive Service financial performance
for the period 1 April 2023 to 1 March 2024 (Period 12).  The report illustrates the
projected outturn as at 31 March 2024, with major outturn variances highlighted and
explained per the Council’s approved Financial Regulations. 
1.2 The Council approved its Capital programme at Policy and Strategy Committee on 16
March 2023 with an allocated budget £14.345m for the current year.  In addition, carry
forwards from the previous year and in-year adjustments have resulted in a revised
Capital Programme of £13.639m for the 2023/24 Financial Year as detailed in Appendix
1 of this report. 
1.3 The Council’s approved Financial Regulations required the Chief Executive to remain
within his approved budgetary provision, and to report all significant deviations –
defined as the higher of £0.100m or 5% - within their budget monitoring reports.  Where
significant deviations were identified, Chief Officers must provide explanatory
commentary, outline the action required to rectify such deviations and where relevant,
must also highlight the impact this has on other budget headings. 
2. Report 
Summary of Financial Position 
2.1 The Service is projecting an underspend of £4.074m for the financial year 2023/24 of
the Capital Programme.  Capital budgets and expenditure are summarised by
Project/Theme in Appendix 1. 
Analysis of Significant Variances   
2.2 An explanation of variances within Business and Digital is detailed below: 
• Digitisation & Innovation
The service is projecting an underspend of £1.209m due to delays in
procurement and building issues associated with the Community Alarm Project
and the Document Retention and Scanning Project. There are further
underspends as a result of timing linked to the Digital Economy and Place
(DigitalNL Connectivity) and the BIHub. 
• Line of Business (LOB)
A year end underspend of £0.979m is anticipated due to timing of procurement
relating to the Digital Telephony Project and the PoS & Access Control
Hardware Upgrade coupled with delays in progressing Financial Systems
Transformation and the ASC Case Management System. 
• End User Device (EUD)
There are delays associated with the Digital Classroom project due to building
control issues and in procurement related to the Interactive Panel Refresh
Programme resulting in a projected underspend of £0.415m. 
2.3 Strategic Communications and Engagement have recently undertaken procurement
exercises which has led to several projects, predominately within Play Areas, slipping
to 2024/25.  This has resulted in an increased projected underspend of £1.471m for the
current year. 
Page 94 of 142

Page 95

Management Action 
2.4 The Service will closely monitor all activities to ensure available budgets are maximised
whilst monitoring and actively managing the ongoing external challenges in delivery of
projects.  The Service will continue to review the programme with updates being
provided to the SCDG and Committee. 
3. Measures of success 
3.1  The Service aim is to operate within approved budget resources over the term of the
capital programme. 
4. Supporting documentation  
Appendix 1 Summary Expenditure by Project / Theme 
Elaine Kemp
Chief Officer (Finance) 
Page 95 of 142

Page 96

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
As stated within the main body of the report. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 96 of 142

Page 97

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.9.1 All activities undertaken by the Council are subject to risk, and in
acknowledging the Council’s approved Risk Management Strategy, Services
manage these as part of their overall corporate and service planning
processes.  The current economic climate, in particular, has the potential to
impact upon the Council’s ability to provide quality services within approved
budget levels. 
5.9.2 To minimise risk this report was prepared by Finance personnel in
consultation with budget managers, in accordance with the Financial
Regulations. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 97 of 142

Page 98

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 98 of 142

Page 99

Appendix 1
Theme 
Budget
£
Actual
£
Committed
£
Uncommitted
£
Projected
Outturn
£
Outturn
variance
£
Digitisation & Innovation 6,395,059     3,580,171     5,154,260     32,004            5,186,265     1,208,794    
Line of Business (LOB) System Portfolio 2,062,205     541,810        986,566        96,489            1,083,055     979,150       
End User Device (EUD) Refresh 1,527,007     407,506        1,110,137     1,870              1,112,007     415,000       
TOTAL BUSINESS and DIGITAL 9,984,271     4,529,487     7,250,963     130,364          7,381,327     2,602,944    
Community Board Project Investment Fund 3,655,261     1,538,809     2,106,006     78,516            2,184,522     1,470,739     
TOTAL STRATEGIC COMMUNICATIONS and
ENGAGEMENT 3,655,261     1,538,809     2,106,006     78,516            2,184,522     1,470,739    
TOTAL CHIEF EXECUTIVES 13,639,532   6,068,296     9,356,969     208,880          9,565,849     4,073,683    
YTD OUTTURN
Chief Executives Capital Programme 2023/24
Summary Expenditure by Thematic Categories
1st April 2023 - 1 March 2024 (Period 12)
Page 99 of 142

Page 100

Page 100 of 142

Page 101

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    EK/GT/RM Date 22/05/24 
Capital Programme 2023/24 Monitoring Report 
From  Elaine Kemp, Chief Officer (Finance)  
E-mail kempe@northlan.gov.uk Telephone 07939 280 601 
Executive Summary
The purpose of the report is to provide an update on the 2023/24 resources and
expenditure for the Council's Strategic Capital Investment Programme. The report also
shows the 2023/24 projected outturn position and the resultant variances. 
The capital programme continues to face challenges in relation to the wider economic
climate linked to availability of materials, contractors and inflationary pressures. It is
currently anticipated that expenditure in the General Fund programme will be £10.209m
lower than programme as the expenditure profile has been reviewed across the multi-year
programme for live projects, and also those in development. 
With the HRA programme, it is currently anticipated that expenditure will be £1.756m more
than the current programme due to an increase in the Buy Back programme as the service
anticipates the purchase of additional properties together with increased average property
prices and associated repairs costs, which are partly offset by re-profiling in the New Build
programme due to project delays and acceleration of specific projects. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledges the financial position of the Council’s Strategic Capital Investment
Programme as at 1 March 2024. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 10(b)
Page 101 of 142

Page 102

1. Background 
1.1 The Strategic Capital Investment Programme 2021/22 to 2025/26 was originally
approved at Policy and Strategy Committee in March 2021, with an updated
programme profile for 2023/2024 to 2025/2026 approved in March 2023 and represents
the total Community Investment Programme incorporating the General Services Capital
Programme and HRA Capital Programmes.  The programme was developed in
conjunction with Services and led by the Strategic Capital Delivery Group (SCDG)
using the principles established by the Council’s Capital Strategy. 
1.2 The General Services Capital Programme supported by General Services resources
demonstrates to communities that the place making visions for towns remains a priority,
and that the Council considers the approved 5-year capital investment plan to be a
major boost to assist the recovery of the local economy. It is also a clear statement that
the Council is planning beyond the pandemic to deliver on the long-term needs and
aspirations of communities. The programme includes additional investment in Town
and Community Hubs, the City Deal programme, and external grant funding. 
1.3 In addition, the Housing Revenue Account (HRA) resources support several HRA
Capital Investment Programmes including Mainstream, Ambition, New Build and
Council Buy Back scheme. 
1.4 The 2023/2024 General Services Capital Programme is currently £144.275m with a
£125.470m investment programme in relation to the Housing Revenue Account. This
reflects the approved budget in March 2023 at Policy and Strategy Committee and
subsequent decisions made at the Strategic Capital Delivery Group (SCDG) in
accordance with the SCDG terms of reference, and where appropriate either by the
individual service committees, Finance and Resources Committee or the Policy and
Strategy Committee per the Scheme of Administration. Appendix 1 provides a
breakdown of the overall 2023/24 budget by Service Programme and associated
approved budget movements. 
2. Report 
Overall Council Strategic Capital Investment Programme 
2.1  The overall Council Strategic Capital Investment programme for 2023/24 and the
projected outturn to the 31 March 2024 is summarised in Table 1 as follows: 
Page 102 of 142

Page 103

2.2  On a budgeted programme of £269.745m expenditure is anticipated to be £8.453m 
lower than current programme at this stage of the financial year. Further financial 
performance information regarding each of the programmes is discussed in section 2.3 
and 2.15 below. 
General Services Capital Programme and Projected Outturn by Service/ Programme 
2.3 The forecast financial performance of the overall General Services Investment
programme at 31 March 2024 is detailed in Appendix 2 and summarised below. 
General Services Total Resources 
2.4 The revised programme is £144.275m incorporating decisions of the Housing
Committee and SCDG to reprofile £55.049m and £20.966m respectively, to future
Community Capital Investment  Programme Summary 2023/24
Current
Programme
£000s
Projected
Outturn 
£000s
Outturn
Variance 
£000s
Enterprise & Communities 128,448 122,279 6,169
Chief Executives 13,639 9,566 4,073
Adult Health & Social Care 2,188 2,221 (33)
General Services: Total Capital Investment 144,275 134,066 10,209
General Services Resources:
General Fund
External Grants & Contributions 2023/24 39,872 39,872 0
External Grants & Contributions b/f 2022/23 16,325 16,325 0
External Grants & Contributions Unapplied (2,115) (2,115) 0
Net External Grants & Contributions 54,082 54,082 0
Capital Receipts 1,000 1,617 617
Capital Receipts -Transfer to Capital Fund 0 (617) (617)
CFCR 3,904 3,904 0
General Services: Total Resources 58,986 58,986 0
General Services : Borrowing Requirement 85,289 75,080 (10,209)
HRA : Total Capital Investment 125,470 127,226 (1,756)
HRA Resources:
Net External Grants & Contributions 19,643 28,689 9,046
Capital Receipts 0 450 450
CFCR 27,146 17,342 (9,804)
HRA : Total Resources 46,789 46,481 (308)
HRA : Borrowing Requirement 78,681 80,745 2,064
Summary
Total Council : Capital Investment 269,745 261,292 8,453
Total Council : Resources 105,775 105,467 (308)
Total Council : Borrowing Requirement 163,970 155,825 (8,145)
Page 103 of 142

Page 104

years of the capital planning period. Total resources available to meet the current
programme are forecast to be £58.986m, resulting in a borrowing requirement of
£85.289m. 
2.5 In 2023/24 net external grants and contributions of £54.082m will be utilised. This
capital resource primarily includes the Scottish Government (SG) General Capital
Grants receivable of £24.134m and other specific SG Grants including City Deal
(£3.000m), Vacant and Derelict Land Fund (VDLF, £1.841m), the Place Based
Investment Programme (PBIP, £1.698m), and Cycling, Walking and Safer Streets
(CWSS, £2.180m), Live Labs II (LLII,  £1.865m) and also NHS contributions of
£4.933m. In addition, capital grants received in 2022/23 have been added to the
programme to match expenditure in 2023/24 including £8.730m for Levelling Up Fund
(LUF), £3.291m for VDLF, £2.283m for PBIP, £1.235m for Regeneration Capital Grant
Fund, £0.289m for Shared Prosperity Fund, £0.272m for CO2 Monitors and £0.230m
for Vacant and Derelict Land Investment Programme. This has been offset by £2.115m
of external grant and contributions which will not be applied in 2023/24 including
£1.000m for VDLF and £1.115m for LL II, in respect of projects which will not now be
completed until 2024/25. 
2.6 Receipts from the sale of assets are currently projected to be £1.617m, which is
£0.617m greater than the budget of £1.000m.  In accordance with the approach agreed
within the Strategic Capital Investment Programme 2021/22 to 2025/26, capital receipts
above the budgeted level of £1.000m will be transferred to the Capital Fund and drawn
down to support the Council’s future revenue budget strategy. 
General Services Total Expenditure 
2.7 As indicated in Table 1 the General Services investment programme is £144.275m. At
Period 12, the outturn spend is anticipated to be £10.209m lower than current
programme. This is primarily due to the outcome of updated programming projections
which have affected several investment themes. The Council’s SCDG continues to
monitor the situation closely. Further analysis by service/programme is outlined below
and summarised within Appendix 2. 
2.8 Enterprise and Communities is projecting outturn expenditure of £122.279m, which
is a £6.169m variance from current programme. 
2.9 Assets and Procurement are forecasting a variance more than programme of £1.076m, 
incorporating a number of compensating variances, arising from the multi-year 
programme of activity. There are forecast over programme variances in Town and 
Community Hubs of £1.826m due to the successful progression of works over the 
winter months on Orbiston Community Hub, additional expenditure in Design Fees of 
£0.427m, Maintaining Existing Assets of £0.222m and Office Rationalisation of 
£0.180m. These are partly offset by reduced expenditure on Sustainable Estate which 
is forecasting a variance of £0.800m, mainly due to timing issues with the physical 
delivery of modular accommodation, Carbon Management of £0.395m for contractually 
committed NDEE projects, ASN Rationalisation of £0.273m due to work on Netherton, 
Childrens Houses and Seven Day Centre now expected to span into the 2024/25 
financial year and Outdoor Education and Outdoor spaces £0.102m. 
2.10 Community Operations are forecasting a variance less than programme of £2.186m 
with variances of £0.991m for Road Asset Management primarily as a result of design 
and installation works now expected to fall into 2024/25 including £0.494m for Street 
Lighting and £0.408m for the Vehicle Restraint System. The Vehicle Replacement 
Programme, Parks Master Plan and Depot Rationalisation themes are also reporting
Page 104 of 142

Page 105

variances of £0.637m, £0.417m and £0.296m respectively as vehicles won’t now be 
procured/delivered.  In addition, committed projects such as the Bellshill Cycle 
Gateway and Bellshill Depot works will not be completed and fully spent until 2024/25. 
2.11 Place is forecasting expenditure to be £5.059m less than programme with variances of 
£3.738m for Economic Regeneration / Growth due to works at Braidhurst Industrial 
Estate, where external funding is being maximised this financial year and Cumbernauld 
Town Centre where demolition work has slipped into 2024/25. A variance of £0.160m 
is reported within the Infrastructure & Transportation theme due to Bridge Safety works 
which are contractually committed but now forecast to be completed in 2024/25. Within 
City Deal, an in-year variance of £1.161m is now forecast as works originally scheduled 
for 2023/24 are also now expected to complete in 2024/25. 
2.12 Committed expenditure of £119.591m is currently reported, which represents 97.80% 
of the targeted expenditure, and actual expenditure is £99.215m. 
2.13 Chief Executives is projecting total expenditure of £9.566m, which is a £4.073m lower
than the current programme. This is primarily attributable to slippage arising from the
prioritisation of projects. This has resulted in reduced in-year expenditure and affected
procurement within Line of Business (£0.979m), Digitisation & Innovation (£1.209m),
End User Device Refresh (£0.415m) and Strategic Communications and Engagement
(£1.471m). Committed expenditure of £9.357m is currently reported, which represents
97.82% of the targeted expenditure, and actual expenditure is £6.068m. 
2.14 Adult Health & Social Care is projecting outturn expenditure of £2.188m, which is a
£0.033m variance from current programme. This is attributable to heightened demand
and complexity of need primarily as a result of the recent pandemic. Committed
expenditure of £1.940m is currently reported, which represents 87.35% of the targeted
expenditure, and actual expenditure is £1.591m.  
HRA Capital Investment 
2.15 The financial performance of the HRA Capital Programme is reported in detail to the
Housing Committee.  A summary of performance as at 1 March 2024 is provided at
Appendix 3. Total expenditure of £127.226m is forecast for 2023/24 which is an
increase on programmed expenditure of £1.756m. This is primarily due to a £5.404m
increase in the Buy Back programme as the service anticipates the purchase of
additional properties in the current financial year together with increased average
property prices and associated repairs costs, and £0.899m increase in the Mainstream
theme due to contractor issues resulting in additional costs to ensure commitments for
planned works are met. These are partly offset by a forecast variance of £4.547m in
the New Build programme due to projects in Airdrie, Coatbridge and Wishaw which are
now expected to complete in 2024/25. 
2.16 The in-year variance is supported by longer-term financial planning assumptions within
the HRA. 
2.17 Committed expenditure of £127.001m is currently reported, which represents 99.82%
of the targeted expenditure, and actual expenditure is £103.867m. 
3. Measures of success 
3.1  N/A   
Page 105 of 142

Page 106

4. Supporting documentation 
Appendix 1: Strategic Capital Investment Programme 2023/24 budget movements
Appendix 2: General Services Capital Investment Programme Summary 2023/24
Appendix 3: HRA Capital Investment Programme Summary 2023/24 
Elaine Kemp
Chief Officer (Finance) 
Page 106 of 142

Page 107

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The financial impact is outlined within the report
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 107 of 142

Page 108

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Despite the updated programme phasing approved at Policy and Strategy
Committee on 16 March 2023 the capital programme continues to face ongoing
delivery risks and challenges. These are currently being managed by services and
Project Boards associated with specific programme delivery and will continue to be
monitored throughout the year in accordance with the SCDG Terms of Reference.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 108 of 142

Page 109

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 109 of 142

Page 110

2023/24 Strategic Capital Investment Programme – budget movements                                                                                         Appendix 1 
Enterprise &
Communities
Chief
Executives
Adult Health
&Social Care Corporate
Total General
Services
Investment
Programme
Total HRA
Investment
Programme
Total Community
Investment
Programme
£000s £000s £000s £000s £000s £000s £000s
23/24 Opening programme approved Policy& Strategy Committee 16 March '23 190,795 14,346 2,200 0 207,341 130,990 338,331
22/23 Overs/Unders Carry Forward 20,366 616 (12) 0 20,970 (5,598) 15,372
23/24 Budget adjustments approved by SCDG (13,682) (1,122) 0 0 (14,804) 0 (14,804)
23/24 Budget adjustments approved by Housing Committee (54,849) (200) 0 0 (55,049) 0 (55,049)
Increase/(Decrease) in Externally Funded Projects (14,477) (1) 0 0 (14,478) 0 (14,478)
Increase/(Decrease) in Council Funded Projects (3,609) 0 0 0 (3,609) 78 (3,531)
CFCR 3,904 0 0 0 3,904 0 3,904
Revised Capital Programme 2023/24 128,448 13,639 2,188 0 144,275 125,470 269,745
Page 110 of 142

Page 111

General Services Capital Investment Programme Summary 2023/24 - as at 31 March 2024 Appendix 2
Investment Current
Programme
2023/24
£000s
Projected
Outturn
2023/24
£000s
Outturn
Variance
2023/24
£000s
Committed
Expenditure @
P12          
£000s
Committed
Expenditure  %
of Projected
Outturn
Actual
Expenditure 
@ P12      
£000s
Enterprise & Communities 128,448 122,279 6,169 119,591 97.80% 99,215
Chief Executives 13,639 9,566 4,073 9,357 97.82% 6,068
Adult Health & Social Care 2,188 2,221 (33) 1,940 87.35% 1,591
Total General Services Investment 144,275 134,066 10,209 130,888 97.63% 106,874
General Services Resources;
External Grants & Contributions 2023/24 39,872 39,872 0
External Grants & Contributions b/f 2022/23 16,325 16,325 0
External Grants & Contributions Unapplied cfwd to
2024/25
(2,115) (2,115) 0
Net External Grants & Contributions 54,082 54,082 0
CFCR 3,904 3,904 0
Capital Receipts 1,000 1,617 617
Capital Receipts - Transfer to Capital Fund 0 (617) (617)
Total Resources  58,986 58,986 0
Borrowing Requirement:
General Services 85,289 75,080 (10,209)
Total General Services Borrowing Requirement 85,289 75,080 (10,209)
Total Resources incl Borrowing Requirement 144,275 134,066 (10,209)
Page 111 of 142

Page 112

HRA Capital Investment Programme Summary 2023/24 - as at 31 March 2024 Appendix 3
Investment Current
Programme
2023/24
£000s
Projected
Outturn
2023/24
£000s
Outturn
Variance
2023/24
£000s
Committed
Expenditure
@ P12       
£000s
Committed
Expenditure      
% of Projected
Outturn
Actual
Expenditure
@ P12     
£000s
Mainstream Programme 55,347 56,246 (899) 56,021 99.60% 44,378
New Build Programme 59,995 55,448 4,547 55,448 100.00% 45,900
Council Buy Back Scheme 10,128 15,532 (5,404) 15,532 100.00% 13,589
Total HRA Investment 125,470 127,226 (1,756) 127,001 99.82% 103,867
HRA Capital Resources;
External Grants & Contributions 19,643 28,689 9,046
External Grants & Contributions Unapplied 0 0 0
Net External Grants & Contributions 19,643 28,689 9,046
CFCR 27,146 17,342 (9,804)
Capital Receipts 0 450 450
Total Resources 46,789 46,481 (308)
Borrowing Requirement:
HRA - Mainstream 32,871 33,217 346
HRA - New Build 39,978 38,181 (1,797)
HRA - Buyback Scheme 5,832 9,347 3,515
Total Borrowing Requirement 78,681 80,745 2,064
Total Resources incl Borrowing Requirement 125,470 127,226 1,756
Page 112 of 142

Page 113

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes ☒ No
Ref: NLC-NPT-23-135 Date: 22 May 2024 
Contract Award for Provision of Merchant Acquiring Services 2024-25 
From  Elaine Kemp, Chief Officer (Finance) 
E-mail kempe@northlan.gov.uk Telephone: 07939 280 601 
Executive Summary 
The Committee is asked to note the award of a contract for Provision of Merchant Acquiring Services
2024-25 (the ‘Agreement’) to Lloyds Bank Cardnet, which is the provision for processing debit and
credit card transactions. 
The award has been made utilising the Council’s Negotiated Tender Procedure (NTP).  The
Agreement is for an initial period of 12 months and commenced on 1st April 2024. 
The value of the Agreement is Two Hundred and Twenty Thousand Pounds Sterling (£220,000)
exclusive of VAT. 
Recommendations 
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the award of the Agreement to Lloyds Bank Cardnet at the value of Two Hundred
and Twenty Thousand Pounds Sterling (£220,000) exclusive of VAT. 
The Plan for North Lanarkshire 
Priority Improve North Lanarkshire's resource base 
Ambition Statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning 
Programme of Work Statutory / corporate / service requirement 
Item 11
Page 113 of 142

Page 114

1. Background 
1.1 The contract is for the provision of merchant acquiring services to the Council, which
incorporates an electronic card merchant acquiring solution to process debit and credit card
transactions and manage the Council's relationship with card schemes e.g. VISA and issuers
such as Barclays bank.  These services enable the Council to accept / receive any card
payments across its services via e-commerce, online or telephone transactions. 
1.2 The requirements within the current Agreement are managed by Lloyds Bank Cardnet, which
was due to expire on 31st March 2024.  The Agreement detailed within this report will
supersede this. 
2. Report 
2.1 Technical and procurement officers developed and agreed the procurement strategy for the
Agreement to ensure the Council achieved maximum benefit and for continuity of service
provision. 
2.2 Based on the initial estimated value of the Agreement the procurement procedure should
have been undertaken in accordance with the Public Contracts (Scotland) Regulations 2015. 
2.3 However, a NTP was used partly because the available procurement frameworks to permit a
direct award before contract expiry, themselves expired in March 2024, thus excluding this
option as a route to award.  In addition, resourcing other priorities resulted in insufficient time
to undertake a full market exercise. Therefore, through the NTP a new short-term contract of
12 months has been agreed with the current supplier, which provides continuation of
essential services, and allows the Council more time to plan a new procurement exercise. 
This will include investigating options of contract route e.g. refreshed procurement
frameworks or full market tender exercise to enable new multi-year contract award by March
2025. 
2.4 The NTP request has been made under regulation 33 (b) (ii) where competition is absent due
to technical reasons, and there is a need to ensure continuity of service provision with the
existing provider.  Transition to a potential new provider through a new longer term
procurement exercise would take considerable time, and the Council cannot risk the
disruption to this service as this would impact income collection via e-commerce, online or
telephone payments from residents and customers. 
2.5  The current supplier was best value option in the previous full market tender exercise and
has agreed to continue the contract on a 12-month extension under existing contract terms. 
Interchange fees are set by the market e.g. Visa / Mastercard.  Service charges for
transactions will remain as per current contract. 
2.6 Following advice from the Chief Officer (Asset and Procurement) and the Chief Officer (Legal
and Democratic), the Chief Officer (Finance) approved the progression of the NTP on 28
March 2024. 
2.7 Following the justification detailed and appraised within the associated NTP strategy
document, the NTP procedure was considered to demonstrate Best Value and is reasonable
in order to minimise significant disruption to existing provision of processing debit and credit
card transactions.  However, it is acknowledged that the nature of requirements and their
total value, does not comply with obligations set out in Regulation 33. Therefore, the service
will undertake a procurement exercise and seek to secure a long-term solution prior to the
end of the NTP contract of 25 March 2025. 
Page 114 of 142

Page 115

2.8 The tender received from Lloyds Bank Cardnet underwent appropriate appraisal to ensure it
was complete / compliant with the council’s requirements and demonstrated best value. 
2.9 Further details of the procurement procedure is provided in Appendix 1 and the SME status
and location of the tenderer is located within Appendix 2. 
Financial / Budget Consideration 
2.10 The pre-tender wholelife estimate budget for the Agreement was £220,000. Following
completion of the procurement procedure, the value of the Agreement to be awarded is Two
Hundred and Twenty Thousand Pounds Sterling (£220,000) exclusive of VAT, the same as
the current contract.  This 
2.11 The costs associated with delivery of the Agreement will be managed within existing revenue
budgets across the Council. 
Price Stability 
2.12 The contract is for a short period of 12 months and no changes in pricing mechanisms are
expected. 
Community Benefits 
2.13 The procurement did not include a community benefit requirement due to the low value of the
contract. 
Fair Work First  
2.14 Lloyds Bank Cardnet advised that they commit to the following areas of the Scottish
Governments “Fair Work First” initiative: 
• payment of at least the real Living Wage;
• provide appropriate channels for effective workers’ voice, such as trade union 
recognition;
• investment in workforce development;  
• action to tackle the gender pay gap and create a more diverse and inclusive 
workplace; and
• offer flexible and family friendly working practices for all workers from day one of 
employment.       
Contract Management 
2.15 Officers from Finance will be responsible for managing the Agreement which will be
undertaken in accordance with the contract and supplier management conditions applied
within the Agreement. 
3. Measures of success 
The Agreement will deliver the following outcomes; 
3.1 Best Value has been considered to be demonstrated by current supplier who was the best
value option for the Council in the previous full market tender exercise.  Current supplier has
agreed to continue the existing contract on a 12-month extension on current contract terms. 
Interchange fees are set by the market e.g. Visa / Mastercard.  Service charges for
transactions will remain as per current contract.
Page 115 of 142

Page 116

4. Supporting documents 
Appendix 1 Summary of Procurement Process
Appendix 2 SME Status and Location of All Tenderers 
Elaine Kemp
Chief Officer (Finance)  
Page 116 of 142

Page 117

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Full impacts have been detailed in the report.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data? 
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-mailed
to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐ Page 117 of 142

Page 118

5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts, highlighting
where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk
Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does
it relate to healthcare, housing, or education services for in-Service or ex-Service
personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to ensure
there has been appropriate consideration of the particular needs of the Armed Forces
community to make sure that they do not face disadvantage compared to other citizens in
the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service delivery,
policy, or plan that has an impact on children and young people up to the age of 18, or on
a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles from the
United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been carried
out? 
Yes ☐ No ☐  
Page 118 of 142

Page 119

Appendix 1 – Summary of Procurement Process
CPT Contract Reference Allocated: NLC-NTP-23-135
Procurement Procedure Utilised: Negotiated Tender Procedure (NTP)
Governing Legislation / Regulations: Public Contracts (Scotland) Regulations 2015
Regulation Number NTP Justified Under: 33 (b) (ii)
Date NTP Strategy Fully Approved: 28 March 2024
Tender Platform Utilised: Email
Date Tender Documents Released: n/a
Tender Return Deadline: n/a
Number of Tenders Received: 1
Tenders from SME’s: 0
Tenders from NLC Based Tenderers:  0
Tenders from Supported Businesses: 0
Number of Recommended Tenderers: 1
Assessment Team: Ryan McNamee / Tracy McCartney / Deborah
Donnelly
Anticipated Start Date of the Agreement: 01 April 2024
Total Agreement Period (Months): 12
Awarded Value of the Agreement: £220,000  
Page 119 of 142

Page 120

Appendix 2 – SME Status and location of all Tenderers 
Name of Tenderer
Size of Tendering
Organisation
(Micro, Small,
Medium or Large)
Location
(Local Authority /
Council Area)
Lloyds Bank Cardnet Large City of Edinburgh   
Page 120 of 142

Page 121

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☒ Yes ☐ No
Ref: LR Date: 22 May 2024 
Contract Award for Supply & Distribution of Groceries and Provisions
2024 – 2026 
From  Lyall Rennie (Chief Officer, Community Operations) 
E-mail hanlona@northlan.gov.uk Telephone: Anne Hanlon – 0793980199 
Executive Summary 
The Committee is asked to approve the award of a contract for Supply & Distribution of Groceries
and Provisions 2024 – 2026 (the ‘Agreement’) to Brake Bros Limited. 
The Agreement is for an initial period of 13 months anticipated to commence on 08 June 2024 until
30 June 2025.  The council reserves the right to extend the Agreement for additional periods up to
a maximum of a further 12 months until 30 June 2026. 
The maximum value of the Agreement for its entire potential duration is Six Million Pounds Sterling
(£6,000,000) exclusive of VAT. 
Recommendations 
It is recommended that the Finance and Resources Committee: 
(1) Approves the award of the Agreement to Brake Bros Limited at the maximum value of Six
Million Pounds Sterling (£6,000,000) exclusive of VAT. 
The Plan for North Lanarkshire 
Priority Improve the health and wellbeing of our communities 
Ambition Statement (22) Facilitate a North Lanarkshire wide approach to asset rationalisation,
including with communities and partners 
Programme of Work Brighter Futures 
Item 12
Page 121 of 142

Page 122

1. Background 
1.1 The council is required to purchase a wide range of ambient, chilled / dairy and confectionery
groceries and provisions to enable the delivery of school meals, catering options etc. 
1.2 Based on recent financial data, the council historically spends on average circa £2.25m
annually for these requirements. Although purchased throughout the council, Facility Support
Services are by far the biggest spend area making up circa 75% of the councils total spend. 
1.3 As has been well publicised, the cost of food and drink products has risen sharply over the
past two years. The institute of Grocery Distribution predicts that food and drink markets are
moving towards recovery in 2025 however prices will remain much higher than what they
were immediately after the Covid pandemic. 
1.4 Historically, the councils grocery and provision have been procured via arrangements
implemented by Scotland Excel with their current arrangement due to expire on 30 April 2024.
However, in January 2024, Scotland Excel advised all participating authorities that their new
framework would not be procured in time and Scotland Excel are extending their current
arrangement by 12 months until 30 April 2025 in line with the appropriate procurement
regulations. 
1.5 The council’s current arrangement for groceries and provisions is due to expire in early June
2024 and the original plan was to migrate to the new Scotland Excel arrangement that was
due to commence on 01 May 2024. However, with this no longer being viable, the council is
now required to procure a new contract to supersede the existing arrangement when it
expires to enable appropriate contractual coverage. 
1.6 In future, and following the expiry of this potential Agreement, it is the councils view to again
migrate requirements to the new Scotland Excel framework. Accordingly, this Agreement
includes appropriate timescales and extension periods to enable a review of the new
Scotland Excel framework once implemented, a review of internal approaches, and the
potential undertaking of a competitive mini-competition via the new Scotland Excel framework
to enable continued contract coverage from 2025 /2026 onwards. 
2. Report 
2.1 A group of technical and procurement representatives was formed to develop and agree the
procurement strategy for the Agreement to enable the council to achieve maximum benefit
for the requirements. 
2.2 The initial estimated value of the Agreement dictated that the procurement procedure be
undertaken in accordance with the Public Contracts (Scotland) Regulations 2015. 
2.3 The procurement procedure was undertaken as a “Direct Award” from the Scotland Excel
framework agreement for Groceries and Provisions (1219) (the “Framework”) 
2.4 Following the justification detailed and appraised within the associated contract strategy
document, the Direct Award procedure was considered to demonstrate Best Value as
detailed below: 
• enabling a continuous, consistent and well established approach to the supply of the
councils groceries and provisions;
• minimal service disruption to a key requirement within the council and any potential “cost
to change” should another supplier be selected to perform the requirements of the
Agreement;
• utilising a well-established route to market via the Framework; Page 122 of 142

Page 123

• Brake Bros Limited being ranked first on the three lots required to be utilised via the
Framework;
• Brake Bros Limited providing a:
o 4% discount against their core item rates should they be appointed to all three of
the identified lots;
o 25% discount against non-core items that are not part of the Framework; and
o 2.25% annual rebate for all spend the council makes should they be appointed to
all three of the identified lots;
• Brake Bros Limited having a large distribution warehouse in North Lanarkshire therefore
protecting local jobs / opportunities; and
• Commitment by Brake Bros Limited to provide a further 0.70% rebate for the sole use of
delivering a range of community benefits specific to North Lanarkshire. 
It should be noted that as well as requirements being procured via the Framework, Brakes
Bros Limited deliver cooked meats and frozen goods through two separate contracts
procured via separate Scotland Excel frameworks. Accordingly, Brakes Bros Limited shall
deliver the requirements of all three contracts in the one delivery where appropriate. This
approach therefore reduces: 
• traffic in school playgrounds;
• carbon emissions; and
• invoice / P2P transactional costs therefore creating a process efficiency. 
2.5 The tender received from Brake Bros Limited underwent appropriate appraisal to ensure it
was complete / compliant with the council’s requirements and demonstrated best value. 
2.6 Further details of the procurement procedure is provided in Appendix 1 and the SME status
and location of the tenderer is located within Appendix 2. 
Financial / Budget Consideration 
2.7 The pre-tender wholelife budget for the Agreement was set as Six Million Pounds Sterling
(£6,000,000) exclusive of VAT. 
2.8 This Agreement is set with a maximum value to enable contingency against any future price
rises with the council offering no guarantee or obligation that the Agreement’s budget be
spent throughout its lifecycle. 
2.9 The majority of costs associated with delivery of the Agreement will mainly be contained
within the revenue budget for Facility Support Services albeit some of the costs will be offset
via payments received for school meals. 
Price Stability 
2.10 Given the ongoing volatile nature of the food markets, an increase in item costs cannot be
ruled out throughout the duration of the Agreement. In the event of any price changes, these
will be applied as directed by Scotland Excel in line with the terms and conditions applied
within the Framework. 
Community Benefits 
2.11 The council is committed to maximising the delivery of community benefits. The procurement
included a community benefit requirement, this approach is designed to deliver local
community benefits where possible. 
Page 123 of 142

Page 124

2.12 Within their tender, Brake Bros Limited committed to provide a further 0.70% rebate of annual
sales for the sole use of delivering a range of community benefits specific to North
Lanarkshire. 
2.13 Accordingly, Facility Support Services will engage with appropriate internal service areas to
enable the delivery of community benefits throughout the Agreements term when the rebate
is received. 
Fair Work First  
2.14 The Fair Work First initiative was not implemented until after the Framework commenced
However, as part of the tender process for the Framework, Scotland Excel assessed areas
such as how tenderer’s will commit to fair work practices and confirmation that staff in
Scotland are paid a minimum of the real living wage or higher. 
Contract Management 
2.15 Officers from Facility Support Services will be responsible for managing the Agreement which
will be undertaken in accordance with the contract and supplier management conditions
applied within the Agreement. 
3. Measures of success 
The Agreement will deliver the following outcomes; 
3.1 Best Value has been considered to be demonstrated as outlined above in section 2.4. 
3.2 the appointment of a supplier who has the experience and capability to provide the
requirements in an efficient form of arrangement;  
3.3 conclusion of a procurement procedure that is compliant with procurement legislation and
internal procedures; and, 
3.4 delivery of a range of Community Benefits in the form of a rebate provided direct to the council
to apply accordingly. 
4. Supporting documents 
Appendix 1 Summary of Procurement Process
Appendix 2 SME Status and Location of All Tenderers 
Lyall Rennie
Chief Officer (Community Operations)  
Page 124 of 142

Page 125

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Generally increased costs for reasons indicated in sections 1.3 and 2.8 above which
impacts on the councils food cost. This shall be continually monitored and associate
budgets reserves should be available to provide comfort should market costs increase
further. Additionally, as above food inflation is being monitored closely. FSS have a
working group to look at both costs and meal uptake. Marketing can be done to promote
uptake of free and paid school meals to both parents and pupils. The higher the uptake
the lower the food cost based on economies of scale. The contents of the menu and
recipes can be reviewed. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data? 
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-mailed
to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 125 of 142

Page 126

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Scotland Excel included a number of sustainability related method statements within the
tender including:
• Carbon dioxide (CO2) emissions, food miles & route planning
• Recycling cradle to cradle - This is the name given to describe products that have
been designed so that every element or material used in its construction can be
either recycled, reused, composted or consumed. The aim of recycling Cradle to
Cradle products are essentially waste-free. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts, highlighting
where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk
Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does
it relate to healthcare, housing, or education services for in-Service or ex-Service
personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to ensure
there has been appropriate consideration of the particular needs of the Armed Forces
community to make sure that they do not face disadvantage compared to other citizens in
the provision of public services. 
Page 126 of 142

Page 127

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service delivery,
policy, or plan that has an impact on children and young people up to the age of 18, or on
a specific group of these? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles from the
United Nations Convention on the Rights of the Child (UNCRC). 
Free school meals is a statutory service therefore the provision of this Agreement shall
contribute towards Children’s Rights and Wellbeing. 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been carried
out? 
Yes ☐ No ☒  
Page 127 of 142

Page 128

Appendix 1 – Summary of Procurement Process
CPT Contract Reference Allocated: NLC-
Procurement Procedure Utilised: Direct Award From Framework Agreement
Governing Legislation / Regulations: Public Contracts (Scotland) Regulations 2015
Date Contract Strategy Approved: 04 March 2024
Framework Owner: Scotland Excel
Framework Title: Groceries and Provisions
Framework Reference Number: 1219
Lot Reference / Title:
Lot 1: Supply & Distribution of Dairy & Chilled
Products
Lot 2: Supply & Distribution of Dried Goods and
Ambient Products
Lot 3: Supply & Distribution of Crisps, Confectionery,
Soft Drinks and Water
Date ITT Published: 14 March 2024
Tender Platform Utilised: PCS-Tender (PCST)
Tender Return Deadline: 12 Noon, 19 March 2024
Number of Tenders Received: 1
Tenders from SME’s: 0
Tenders from NLC Based Tenderers:  1
Tenders from Supported Businesses: 0
Number of Recommended Tenderers: 1
Assessment Team: Officers from Facility Support Services and the
Corporate Procurement Team
Anticipated Start Date of the Agreement: 08 June 2024
Total Agreement Period (Months): 25 (13 + 6 + 6)
Awarded Value of the Agreement: £6,000,000
Page 128 of 142

Page 129

Appendix 2 – SME Status and location of all Tenderers 
Name of Tenderer
Size of Tendering
Organisation
(Micro, Small,
Medium or Large)
Location
(Local Authority /
Council Area)
Brake Bros Limited Large Kent¹ 
¹ Although Brake Bros Limited are registered in Kent, their distribution centre for the majority of Scotland
is located in a prominent position within North Lanarkshire 
Page 129 of 142

Page 130

Page 130 of 142

Page 131

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    VarRepApril24/JMcG/JMcK Date 23/05/24 
Contracts with Variations 
From  James McKinstry, Chief Officer (Assets and Procurement)  
E-mail mckinstryj@northlan.gov.uk Telephone 
Executive Summary
In accordance with the Council’s Financial Regulations, this report notifies the Committee
of contracts completed between 1st October 2023 and 31st March 2024, where the
expenditure levels have exceeded the contract award levels by greater than 5% or
£25,000. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Note the content of this report and the accompanying appendix. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory/Corporate/Service Requirement
Item 13
Page 131 of 142

Page 132

1. Background 
1.1 The Councils General Contract Standing Orders (the ‘GCSOs’) outline financial
approval thresholds for contracts for goods, works and services. This report details
Works (construction contracts) where funding has previously been approved in line with
GCSO’s. 
1.2 The Councils Financial Regulation, (13.4) Significant Variations, details the threshold
of variances where reporting is required. 
1.3 The Chief Officer of Assets and Procurement is required to notify Committee on a
periodic basis of any such contracts containing variations as identified by the criteria in
1.1 above. 
2. Report 
2.1 The Councils Financial Regulations state, any variations where the outturn/expected
costs exceed the tendered contract price by the higher of £25,000 or 5%, or where the
outputs/outcomes achieved by the expenditure differ from those originally envisaged,
shall be reported by the Executive Director or appropriate Officer to the relevant
Spending Committee at the earliest opportunity. 
2.2 Contracts awarded by the Chief Officer of Assets and Procurement for works
undertaken in the period 1st October 2023 and 31st March 2024 containing variations
are detailed in Appendix.1 below. 
2.3 Due to the nature of construction contracts a flexible approach is required to manage
contract deliverables and desired outcomes and typically this is achieved by the
inclusion of a contingency allowance to address unknown quantities or abnormalities. 
2.4 Any construction works undertaken within the Council’s portfolio may encounter issues
that can result in additional costs after work has commenced. Asbestos is problematic
and costly to address, especially within the Council’s ageing property estate. The
rerouting of service provisions is another contributing factor with other expenditure
being attributed to health and safety issues including addressing fire stopping issues.
Additional client instructions being added to contracts following award will also increase
the overall contract sum, but it should be noted that the scope of these instructions will
be within the parameters of the original tender documents and rates will be a direct
drawdown from those already provided or a benchmarking exercise is undertaken to
demonstrate value for money. 
3. Measures of success 
3.1  Contracts support the delivery of Council objectives and service priorities. 
3.2 Contracts containing variances are managed by the Council and are compliant with
Financial Regulations, GCSOs and procurement legislation. 
3.3 The Council’s Contract Register and budgetary monitoring systems are kept updated
by services and management information is comprehensive and accurate. 
3.4 Best Value is both demonstrable and achieved.   
Page 132 of 142

Page 133

4. Supporting documentation 
4.1 Appendix 1 – Summary of construction contracts containing variations. 
James McKinstry
Chief Officer (Assets and Procurement) 
Page 133 of 142

Page 134

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
As detailed in Appendix 1. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 134 of 142

Page 135

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Contract management procedures may be susceptible to financial claims and legal
challenge if they are not discharged in accordance with Contract Conditions,
Financial Regulations, GCSO’s and procurement legislation. 
Accumulation of contract overspends may impact on future Capital Programmes.
Project risks are logged on the appropriate Risk Registers and managed by the
Service.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 135 of 142

Page 136

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 136 of 142

Page 137

APPENDIX 1
Summary of construction contracts containing variations: 
Project Title Estimated
Final Out-turn Tender Amount Variation Reason
Langloan Primary School,
Coatbridge - Perimeter Wall/ Shed
Repair
£243,417.62 £191,914.61
An additional section of wall had to be rebuilt which
led to an extension of time instruction.
St Margaret’s High School, Airdrie
– Pupil toilet upgrade £282,972.39 £239,192.79
Repairs and upgrading of existing ventilation
system required new a power supply and the
installation of an additional distribution board.
Westfield Primary School,
Cumbernauld - Pupil Toilet
Upgrade
£227,112.32 £184,729.83 Asbestos removal and the subsequent installation
of new suspended ceilings.
Firpark ASN School, Motherwell –
Toilets Upgrade  £369,515.74 £257,380.72
Repairs to existing ventilation system led to the
requirement for a new power supply and the
installation of additional distribution boards;
Underground drainage pipes had to be re-laid.
St Patrick’s Primary School,
Shotts – Rewire, Fire Stopping
and Redecoration
£1,168,246.81 £1,047,186.81
Additional out of hours working required to
minimise disruption to school and the provision of
additional IT Data cables.
Tryst Sports Centre, Cumbernauld
- Reroofing £334,132.58 £266,126.00 Replacement of complete corroded box guttering
required.
Langloan Primary School,
Coatbridge – Window
Replacement
£359,954.56 £332,183.80
Unforeseen high volume of rot in sash boxes was
replaced, additional insulation was required and
additional fans installed.
Corpus Christi Primary School,
Airdrie - New Kitchen Upgrade  £340,180.46 £244,966.51
Additional steelwork required to support Air
Handling Unit; New power supply to kitchen from
main Distribution Board from other side of school;
additional new suspended ceiling and lighting.
St Gerard's Primary School,
Bellshill - New Kitchen Upgrade £353,134.70 £300,140.10 Additional steelwork on roof required to support
new Air Handling Unit.
St Brendan’s Primary School,
Motherwell - New Kitchen
Upgrade
£342,498.86 £309,743.33 Following the removal of asbestos the Client
instructed installation of new ceilings.
Page 137 of 142

Page 138

Project Title Estimated
Final Out-turn Tender Amount Variation Reason
Thornlie Primary School, Wishaw -
New Kitchen Upgrade £365,317.71 £253,974.25
Upgrade to power supply required to kitchen from
main distribution board; additional new suspended
ceiling + lighting required
St Maurice's High School,
Cumbernauld - School Science
Labs
£382,873.26 £351,700.28
Air-conditioning duct was rerouted via roof;
additional time claim to allow working with school
timelines; Client instructions including additional
lighting, ceilings and water supply. 
Page 138 of 142

Page 139

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    JMcK/CPT Date 22/05/24 
Contracts awarded below Committee approval threshold 
From  James McKinstry, Chief Officer (Assets and Procurement)  
E-mail McKinstryJ@northlan.gov.uk  Telephone 07939 281 102 
Executive Summary
In accordance with the Council’s General Contract Standing Orders (“GCSOs”), GCSO
21.10 requires a summary report be presented to members with details of contracts
awarded since last committee, specifically for the spend range: 
• over £50,000 but below £500,000 for supplies or services; and,
• over £500,000 but below £2,000,000 for works. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the contract awards made since last committee reporting cycle.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work All Programmes of Work
Item 14
Page 139 of 142

Page 140

1. Background 
1.1 The Local Government (Scotland) Act 1973 section 81 requires local authorities to
“…make standing orders with respect to the making by them or on their behalf of
contracts for the supply of goods or materials or for the execution of works.”. 
1.2 The Council’s General Contract Standing Orders (“GCSOs”) set out the council’s
specific procurement procedures and responsibilities at all spend levels, and include
the reporting requirements of procurement activity, including contracts awards, to
committee for either approval or acknowledgement. 
2. Report 
2.1 In accordance with GCSO 21.10, this report summarises the contract awards since last
committee, specifically for the spend range: 
• over £50,000 but below £500,000 for supplies or services; and,
• over £500,000 but below £2,000,000 for works. 
2.2 If you require further information regards the contract awards reported, please refer to
the lead service area / Chief Officer detailed in the appendix. 
3. Measures of success 
3.1 All requirements contracted contribute to either the council’s programme of work and/or
fulfil a statutory requirement. 
3.2 All contract awards secure best value for the council in accordance with their evaluation
criteria. 
3.3 All necessary diligence has been undertaken in the evaluation and appointment of
contractors. 
3.4 All contract awards are logged in the council’s contract register. 
4. Supporting documentation 
4.1 Appendix 1 – Summary of contracts awarded. 
James McKinstry
Chief Officer (Assets and Procurement) 
5. Impacts 
5.1 Impacts considered as part of the contract award procedures are recorded in the
individual contract award reports held by the lead service area.  
Page 140 of 142

Page 141

Appendix 1 – Summary of Contracts Awarded 
Contract Ref NLC-SLP-23-091
Title Heathery Park Family Learning Centre; Completion Project
Classification Works
Lead Service Area / Chief Officer James McKinstry, Chief Officer (Assets and Procurement)      
Competition Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on 3rd party frameworks
Procurement Route Direct Award using Third Party Framework
No. of Framework Contractors 17
Award Criteria Best Value assessment, in accordance with the Framework Information
Comments This call-off was made from Scotland Excel’s Property Maintenance and Refurbishment Framework,
ref: 1821, Lot 15 Multi Trades. The Framework permits use of the Direct Award approach.     
Award
Details
Value £713,194.86
Contract Duration 5
Contractor Name Procast Building Contractors Ltd
Contractor Size SME
Contractor Location South Lanarkshire
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? Yes      
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer Scotland
Duty ☐
HR Policy Impact ☐ Data Protection Impact ☐ Environment / Carbon
Impact ☐
Risk Impact ☐ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☐ Legal Impact ☐ Technology / Digital
Impact ☐
Communications Impact
☐
Armed Forces Covenant
Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer       
Page 141 of 142

Page 142

Page 142 of 142