27 January 2025 
Members of the 
Environment and Climate Change Committee
Chief Executive’s Office
Archie Aitken
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk 
Notice is given that a Meeting of the Environment and Climate Change Committee is to
be held in the Council Chamber, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on
Wednesday, 05 February 2025 at 14:00 PM which you are requested to attend. 
The agenda of business is attached. 
Archie Aitken
Chief Officer (Legal & Democratic) 
Members : 
Clerk Name: Karen Swan
Clerk Telephone: 07919 730272
Clerk Email: committee@northlan.gov.uk 
H Loughran, J McPhilemy, T Carragher, P Di Mascio, K Duffy, A Duffy-Lawson, F
Fotheringham, W Goldie, K Harmon, J Leckie, F MacGregor, A Masterton, M McBride, B
McCulloch, M McCulloch, F McKay, C McManus, L Nolan, J Reddin, L Roarty, G Robinson,
A Smith, A Thomas, C Williams, N Wilson.  
Page 1 of 102

Page 2

Page 2 of 102

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical
Standards In Public Life Etc. (Scotland) Act 2000   
2 Trading Standards - Doorstep Crime and Related
Scams - Enforcement and Prevention Work
Submit report by Chief Officer (Community Operations)
highlighting the ongoing commitment of the Council's
Trading Standards service to protecting vulnerable
residents from doorstep crime. 
5 - 16 
3 Garden Waste Permit Scheme
Submit report by Chief Officer (Community Operations)
providing an update on the operation of the Garden
Waste Permit Scheme as approved by Committee on
30 October 2024. 
17 - 40 
4 Public Sector Duties Climate Change Report 2023-
2024
Submit report by Chief Officer (Assets and
Procurement) providing a summary of the Public
Sector Report on Compliance with Climate Change
Duties; progressing and retaining the budget and
targets of the Climate Plan ACT 2030 and advising that
the Climate Plan will be replaced by a Net Zero
Pathway. 
41 - 58 
5 Review of Strategy for the Inspection of
Contaminated Land 2025-2030
Submit report by Chief Officer (Community Operations)
seeking approval of the Council’s Environment
Pathway. 
59 - 90  
Contracts   
6 Contract Award for Supply and Delivery of Liquid
Fuels
Submit report by Chief Officer (Community Operations)
seeking approval for the award of a contract extension
for the Supply and Delivery of Liquid Fuels (the
‘Agreement’) to Highland Fuels Limited and Certas
Energy Limited t/a Scottish Fuels. 
91 - 98
Page 3 of 102

Page 4

7  Contracts Awarded Below Committee Approval
Threshold
Submit report by Chief Officer (Assets and
Procurement) notifying of the Contracts Awarded since
the last meeting of the Committee with a value below
the financial threshold requiring approval. 
99 - 102 
Page 4 of 102

Page 5

North Lanarkshire Council
Report
Environment and Climate Change Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    PM/MM/02 Date 05/02/25 
Trading Standards – doorstep crime and related scams –
enforcement and prevention work 
From  Lyall Rennie, Chief Officer (Community Operations)  
E-mail RennieLy@northlan.gov.uk Telephone 07855 193500 
1. Background 
1.1 Trading Standards, in collaboration with Police Scotland, aims to proactively safeguard
residents from doorstep crime incidents. Doorstep crime disproportionately affects
vulnerable individuals due to factors such as age, infirmity, illness, disability, poverty or
Executive Summary 
This report highlights the ongoing commitment of the Council’s Trading Standards service
to protecting vulnerable residents from doorstep crime. This is achieved through a
combination of proactive measures, enforcement actions, and community engagement.
These efforts aim to safeguard the overall health and wellbeing of our community. 
The report details various activities undertaken, often in collaboration with external
enforcement partners, to ensure the Council fulfils its statutory consumer protection duties
related to doorstep crime and scams. 
The success of these initiatives is evaluated using outcome-based models and reports,
ensuring continuous improvement and adaptation to emerging threats. 
Recommendations
It is recommended that Environment and Climate Change Committee: 
(1) Supports the Trading Standards preventative doorstep crime and scam
initiatives; and
(2) Endorses the work plan to increase the availability of call blocking technology
available to those potentially vulnerable to scam telephone calls.
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (14) Ensure the highest standards of public protection
Programme of Work All Programmes of Work
Item 2
Page 5 of 102

Page 6

bereavement. Criminals exploit these vulnerabilities by cold-calling and coercing
victims into agreeing to unnecessary property repairs or maintenance work. 
1.2 Nearly a decade ago, our Trading Standards service began working closely with Police
Scotland colleagues to take robust enforcement action against organised crime groups
involved in doorstep crime. We embedded a member of staff within a Police office, in
the first initiative of its kind in Scotland: Collaboration - TS Today (cpl.co.uk) 
1.3 Following the conclusion of Operation Doric, we have continued to collaborate with the
Police to report criminal offences to the Crown and develop new preventative
approaches to stop crimes before consumers become victims. 
1.4 In many of the recorded doorstep crime incidents, large cash deposits have been taken
by criminals for work which may be fraudulently deemed necessary, for the completion
of sub-standard work, and even for works which are never undertaken. Doorstep
criminals pressurise vulnerable consumers and exploit them for financial gain. They
often persuade victims to withdraw cash from bank or building society accounts whilst
they wait nearby to collect. 
1.5  Elderly victims face severe consequences from doorstep crime. Research indicates a
direct cost to Local Authorities, as victims often lose their confidence and
independence, suffer from depression, and require intervention. This may include
providing sheltered accommodation and Social Services support. Studies show that
older victims experience faster health declines compared to non-victims of a similar age
and are 2.4 times more likely to be in residential care within two years of being targeted. 
1.6 The UK government’s “Fraud Strategy: Stopping Scams and Protecting the Public”
emphasises the need to empower citizens against scams. Of particular concern in this
strategy document, published in 2023, is the statement that fraud now accounts for
40% of all crimes, making this issue critical. 
https://www.gov.uk/government/publications/fraud-strategy/fraud-strategy-stopping-
scams-and-protecting-the-public 
1.7 The Scottish Government’s ‘Scams prevention, awareness and enforcement strategy:
2021 to 2024’ Scams prevention, awareness and enforcement strategy: 2021 to 2024
- gov.scot (www.gov.scot) states that “scamming is a criminal offence” and that we must
tackle scams in the same way that we do any other type of criminal activity, through
enforcement, public education, resilience building and stakeholder coordination.  The
Plan for North Lanarkshire aims to improve the health and wellbeing of our communities
through the highest level of public protection and by improving preventative approaches
and supports at home. 
1.8  Trading Standard have developed several proactive measures to better protect
vulnerable residents, working in partnership with Police Scotland including:
• The introduction of designated No Cold Calling Zones (NCCZs)
• Provision of telephone call blocking technology to prevent scam and nuisance calls;
• Provision of video doorbells;
• Joint roaming patrols with Police Scotland across the area with a focus on doorstep
crime hotspots; 
• Shut out Scammers campaign; 
Page 6 of 102

Page 7

• Awareness raising visits to supermarkets, post offices and town centres to raise
awareness amongst staff of common scams (following visits in previous years to
banks and building societies); and
• Responding to National Trading Standards scam referrals. 
2. Report 
2.1 Trading Standards have worked in partnership with Police Scotland for several years
on reactive doorstep crime initiatives. Intelligence suggests that active crime groups
have in the main moved out of North Lanarkshire, and this is thought to be as a direct
result of the proactive and collaborative approach we have taken to doorstep crime in
recent years. 
2.2 Two joint investigations dating back to 2018-2019 resulted in 4 prolific doorstep crime
offenders being found guilty of fraud and Trading Standards offences at the Sheriff
Court in April 2024. The perpetrators failed to carry out works, falsely claimed Council
grants were available for roofing works / free boilers and signed victims up to loans for
thousands of pounds. All 4 offenders received substantial custodial sentences of
between 18 and 36 months. Two cowboy builders jailed after string of frauds that
included swindling one man out of £56k - Daily Record and Conmen jailed after
Lanarkshire householders lose thousands of pounds in heating scam - Daily Record 
2.3  A joint report to the Crown Office & Procurator Fiscal Service has been submitted
against a problem trader for both common law fraud and consumer protection from
unfair trading offences. The consumer detriment is in excess of £91,000. In addition,
the service is pursuing a civil Enforcement Order against the subject, to prohibit any
future repeat behaviour. 
2.4 On 8 August 2024, at Airdrie Sheriff Court, an Order was granted prohibiting a
Cumbernauld car company and its Director from engaging in several unlawful trading
practices. This action followed a significant number of complaints regarding the sale of
unroadworthy vehicles, misleading statements in respect of vehicles, and refusal to
provide consumers with their statutory right to redress when vehicle faults were
identified. An Interim Enforcement Order had been obtained from the Sheriff Court in
October 2023. The Enforcement Order places conditions on the business and its
Director. The service will monitor compliance and pursue any breaches of the Order.
Trading Standards take action against car dealer | North Lanarkshire Council 
2.5   At the time of preparing this report, 40 areas across North Lanarkshire have been
designated “No Cold Calling Zones” in Shotts, Cleland, Wishaw, Motherwell, New
Stevenston, Newarthill, Uddingston, Bellshill, Salsburgh, Chapelhall, Airdrie,
Cumbernauld, Coatbridge, Kilsyth and Moodiesburn. The zones include 33 out of 34
Retirement Housing Complexes run by North Lanarkshire Council and 7 out of 9 Bield
Housing & Care run premises https://www.bield.co.uk/about-us/. 
2.6  The zones have been identified as suitable for intensive intervention and joint patrols
by Trading Standards and Police officers. The initiative is designed to allow residents
to feel safer in their homes and help prevent doorstep crime. The zones follow requests
and consultation with residents in areas considered to be doorstep crime hot spots
Page 7 of 102

Page 8

and/or with a high number of elderly residents. Residents in the NCCZs have received
information on scam prevention and nuisance and scam telephone call blocking
technology. 
2.7   Scam telephone calls pose a significant threat to residents. Bogus callers impersonate
a wide range of individuals and organisations including Council staff, charity collectors,
meter readers, and financial institutions. Their goal is to obtain sensitive data, money,
or other valuable assets. We work in partnership with trueCall to provide specialised
call blocking technology designed for older and vulnerable individuals. The service has
seen an increase in demand for call blockers with 50 new requests for units in the last
12 months. 
2.8  North Lanarkshire Trading Standards has installed 158 trueCall call blocking units over
the past 10 years, with 43 units installed in 2024 alone. These units aim to protect
vulnerable residents from nuisance and scam phone calls. According to trueCall’s data,
the project is estimated to have prevented 323 scams over its lifetime, resulting in a
benefit of £1,838,869 to both individuals and the public purse. 
2.9  The call blocking units collect data on blocked calls, which is useful for law enforcement.
It contributes to identifying patterns and trends in fraudulent calls. Units fitted identified
that residents in the area receive 29 nuisance calls per month compared to the UK
average of 9 per month. Additionally, 34% of incoming calls received by the units (and
blocked) are nuisance and scam calls. 
2.10 A survey of those residents recently provided with a scam and nuisance call blocking
unit highlights a significant improvement in their sense of security and peace of mind.
Many users expressed relief from the anxiety and worry caused by scam and nuisance
calls. They appreciate the system's effectiveness in blocking unwanted calls, allowing
them to answer the phone without fear. The service has made their lives more relaxed
and comfortable. Overall, users are very pleased with the service, noting that it has
made their daily lives easier and more peaceful. The compelling feedback can be
viewed in appendix A. 
2.11 Trading Standards team members monitor the call blocking devices to identify any
unusual activity. A review of a recent referral from the family of a resident with
Alzheimer’s revealed that within the first three days of installation, the device
successfully blocked 47 scam and nuisance calls. These calls originated from various
phone numbers known for selling domestic appliance insurance, personal alarms, and
healthcare services, as well as conducting surveys.
2.12  Video doorbells are provided by Trading Standards in very limited circumstances to
vulnerable victims of doorstep crime where the provision is deemed likely to reduce the
likelihood of reoccurrence. Funding for video doorbells was provided through the
Community Partnership Team, Local Development Programme, Partnership Funding
and the National Trading Standards team. 
2.13 A complaint was received from the family of a vulnerable resident who received a cold
call at their front door, to have their roof washed and sealed. The perpetrator had the
consumer sign a waiver to have the work started right away. The resident in question
had Alzheimer’s and was terminally ill. The trader was known to our service and had a
previous criminal conviction for fraud. A same-day joint visit was made by Trading
Page 8 of 102

Page 9

Standards and Police colleagues. The trader drove into the street but quickly left when
they became aware of our presence at the locus. The family was supplied with a video
doorbell to offer protection, and the Police agreed the household would receive an
immediate response to any related 999 call and to carry out extra patrols in the area. 
2.14  It was recognised that greater awareness was needed to alert members of the public
to the most common scams. As part of the ‘Shut out Scammers’ campaign, Trading
Standards staff attended town centre locations with Police Scotland. During the
campaign, members of the public registered with the mailing preference service and
telephone preference service and were offered trueCall telephone call blocking devices
where this was identified as being of potential benefit. 
2.15  A high number of gift voucher scams have been reported in the area. The scams have
involved cold callers claiming to be from the Police, Local Authority, Driver and Vehicle
Standards Agency or HMRC, claiming their intended victim must pay a fine or tax. They
instruct the member of the public receiving these calls to purchase gift cards and pass
over the unique code as means of payment. Visits were made by the Police and Trading
Standards to supermarkets and town centres to carry out an input to tellers, asking that
they alert consumers to the fraud when buying a high value quantity of gift cards. 
2.16  The National Trading Standards team make referrals to local authority Trading
Standards services from mailing scams they are investigating or mail that they have
intercepted. Some referrals include the return of cheques the consumer has sent when
they have been duped. A visit is made to the consumer to return the cheque and provide
scam prevention information, assessing if the consumer would benefit from further
interventions. The service has received 20 scam referrals in this year. 
3. Measures of success 
3.1 No Cold Calling Zones will continue to be rolled out to doorstep crime hot spots and
areas where evidence supports their introduction. 
3.2  We have introduced an outcome based model for service response to complaints and
interventions. The model details: 
• the number and value of outcomes that prevent financial detriment, 
• ensure legitimate businesses are not disadvantaged through unfair competition,
• bring business into compliance with applicable legislation, 
• safeguard the health and wellbeing of consumers, 
• prevent inappropriate access to restricted products, and 
• reduce consumer exposure to unsafe products.
The outcome data in respect of preventing financial detriment and safeguarding the
health and wellbeing of consumers will assist the service in monitoring the impact of
our proactive measures. 
3.3  TrueCall offers a report detailing the number of units installed, the number of nuisance
calls prevented and an indicative figure of the reduced public service costs as a result
of the scam and nuisance telephone calls blocked. The report details the top 10
nuisance and scam callers to residents in the area, providing valuable data for
enforcement purposes and targeted publicity campaigns. 
3.4  In January 2024, it was identified that Trading Standards had fitted 35 trueCall units
per 100,000 North Lanarkshire population. The Scottish average is 105 units per
Page 9 of 102

Page 10

100,000 population. Increasing the availability of call blocking technology to potentially
vulnerable residents was identified as a key priority for the service, and we will continue
to deploy units as vulnerable residents are identified. 
3.5  In August 2024, the service was awarded funding from the Community Partnership
Team, Local Development Programme, Partnership Funding to purchase 40 call
blocking units and 3 video doorbells. The service sourced an additional 50 units from
the Society of Chief Trading Standards Officers and Trading Standards Scotland. 
3.6 In the first 11 months of 2024, our service has fitted 43 call blocking units providing
additional protection to residents vulnerable to scams. Appendix C illustrates that as of
October 2024, the new units had blocked 2,446 calls and were estimated to have
prevented 4 scams. Over the lifetime of the units, it is estimated that they will block
33,730 nuisance calls, of which 9,238 will have been scam calls. This is calculated to
lead to a reduction of £149,456 in NHS, social care and Police costs. 
3.7  A trueCall unit and associated information has been placed in the Tech flat (Housing
and Social Work’s Assistive Technology Team) which has generated further requests
for the provision of this call blocking technology to residents. 
3.8 Information on scams, no cold calling stickers and the availability of call blocking
technology has been sent to 44 Sheltered Housing Complexes.   
4. Supporting documentation 
4.1. Appendix A - trueCall, call blocking technology survey response returns 
4.2 Appendix B - table showing number of trueCall units fitted per 100,000 population 
4.3 Appendix C - infographic detailing the impact of the 40 units fitted between January
and October 2024. 
Lyall Rennie
Chief Officer (Community Operations) 
Page 10 of 102

Page 11

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 11 of 102

Page 12

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 12 of 102

Page 13

Appendix A 
Telephone call blocker survey results received from residents who have received a
call blocker in 2024. 
What impact has the call blocker had on your day to day life? 
“I feel a lot safer, and don’t have to worry about scammers.” 
“Don’t worry now when phone rings” 
“Causes me less worry and anxiety when I hear the phone ring as I know it won’t be a cold
call or scammer.” 
“Peace of mind. Absolutely terrific” 
“I have peace of mind” 
“Made life more relaxed and comfortable. So grateful to the two ladies who installed the
system… First class” 
“As the moment no calls are getting through. The hall phone rings once but doesn’t go any
further and the answer machine has been very quiet. This sits in the background, iv had no
issues.” 
“I am very pleased with the service, life is easier with the blocker.” 
“Gives me peace of mind that scammers won’t get through” 
“Its bliss I never get a nuisance call now” 
“The fact that it blocks these calls you can answer the phone knowing it’s a friend or family
and you don’t get these calls that call you before 9am.” 
“PEACE OF MIND knowing I will get peace from nuisance calls at all times of the day. Since
I had the blocker I have had no bother with unwanted calls” 
“I now answer phone calls” 
Page 13 of 102

Page 14

Appendix B 
The table below shows as of January 2024, NLC had fitted 35 Truecall units per
100,000 population.  We seek to increase this number in 2024/25 and beyond to
proactively protect North Lanarkshire residents. 
Page 14 of 102

Page 15

Appendix C - infographic detailing the impact of the 40 units fitted between January and
October 2024. 
Page 15 of 102

Page 16

Page 16 of 102

Page 17

Garden Waste Permit Scheme
North Lanarkshire Council
Report 
Does this report require to be approved? ☐ Yes  ☒ No
Ref LR Date 05/02/25 
From Lyall Rennie, Chief Officer (Community Operations)
E-mail renniely@northlan.gov.uk Telephone 07855 193500 
Executive Summary
The purpose of this report is to provide Members with a detailed report on the operation of
the Garden Waste Permit Scheme as recommended in the report approved by committee
on 30 October 2024. 
Recommendations
It is recommended that the Environment and Climate Change Committee: 
(1) Acknowledge the content of this report. 
The Plan for North Lanarkshire
Priority Improve the health and wellbeing of our communities
Ambition statement (17) Ensure we keep our environment clean, safe, and attractive
Programme of Work Sustainable Futures
1. Background 
1.1 In October 2024 the Environment and Climate Change Committee approved the
proposal to introduce a charge of £40 per annum for the uplift of garden waste and
agreed that a further detailed report be prepared and submitted prior to the introduction
of the scheme. 
1.2 As previously noted, the Council introduced a combined food and garden kerbside
waste collection service as part of the introduction of the three-weekly collection cycle
complying with the Waste (Scotland) Regulations 2012, which placed a statutory
obligation on local authorities in Scotland to provide householders with a separate food
waste collection service. Therefore, residents will continue to receive a food waste only
collection free of charge.
1.3 Approximately 110,000 households currently participate in the brown bin collection for
co-mingled food and garden waste.
Environment and Climate Change Committee
Item 3
Page 17 of 102

Page 18

2. Report 
National Position 
2.1 As councils across the country seek to address budgetary pressures, charging for
garden waste collections has become increasingly common. Of the 26 councils that
provide a garden waste collection service, 22 operate a chargeable garden waste
permit scheme. This leaves North Lanarkshire as one of only four councils still offering
a free garden waste collection serviceservice.   
Introduction of Scheme
2.2 The introduction of a garden waste permit scheme will generate income for the Council
and recover some of the costs associated with providing the non-statutory service. 
2.3 Residents who wish to participate in the scheme are required to purchase a permit for
each bin containing garden waste. Should any resident have more than one bin, then
a separate permit would be required for each bin. It should be noted that residents who
use the bin solely for depositing food waste do not require a permit as food waste would
still be collected free of charge as a statutory collection.
2.4 The cost of the permit is £40 per annum and will allow a resident to present one brown
bin containing garden waste on each scheduled collection day until the end of that year.
The brown bin is collected on a fortnightly basis with the exception of the Christmas
and New Year period when the collection is suspended. This is to allow Waste
Resources to prioritise the collection of residual and recyclable waste as tonnages of
these waste streams increase over this period, while garden waste tonnages are at
their lowest. The scheme will run 1 June to 31 May each year. 
2.5 The new service will commence on 1 June 2025. Residents will be able to purchase
their permits from 1 April 2025 and to provide residents with a sufficient period in which
to purchase the permit and adapt to the new collection scheme, all brown bins will be
collected as normal until 1 June 2025 when garden waste will only be collected from
those bins displaying the correct permit. 
Consultation 
2.6 Waste Resources have engaged with the council’s Business and Digital team and
development work is underway on the Council’s Customer Relationship Management
(CRM) system, to enable residents to order and pay for permits online. It should be
noted that North Lanarkshire Council housing tenants who are included in the garden
waste collection service will receive a permit automatically each year in the post,
removing the requirement to apply for the permit as the costs for the uplift of the garden
waste will be incorporated within the rental costs for the properties.
2.7 Discussions have also taken place with the Customer Service Hub and Housing
Management Services to advise them of the service change and agree processes for
the operation of the scheme. 
2.8 Waste Resources will undertake community engagement to ensure residents are
aware of the new charge as well as the alternatives if they do not wish to participate in
Page 18 of 102

Page 19

the service. These include continued use of the Council’s 6 Household Waste
Recycling Centres (HWRC) to dispose of garden waste for free as well as the promotion
of home composting. Information on home composting is available on the Council’s
website which also signposts to guidance and toolkits from Zero Waste Scotland. 
2.9 As part of the communications strategy, several documents have been developed
including Frequently Asked Questions, Terms and Conditions and summary
document for residents “Your Household Waste and Recycling Service” which applies
to all waste streams. A copy of these documents are attached as Appendices 1 to 3.
Project Support 
2.10 A Project Team has been established to manage the design, implementation and roll
out of the service and will be responsible for liaising with public, issuing
communications and dealing with any queries. Two temporary posts will also be
created to provide additional support which will limit the impact the project may have
on the Council’s Customer Service Hub staff. 
Financial Impact 
2.11 Based on an annual charge of £40 per annum, delivery of this permit scheme will
generate an overall net annual income to the Council of approximately £1.5m following
removal of the administration costs. Of this income, around £0.720m will be generated
from the Council’s Housing Revenue Account as the costs for the uplift of the garden
waste will be incorporated within the rental costs for the properties. The overall saving
figure also assumes a 30% uptake across all non-Council properties receiving the
current service and is net of the potential additional residual waste costs which may be
experienced if residents deposit garden waste within the residual black bin or at
recycling centres.
Recycling Impact 
2.12 The collection of garden waste accounts for around 15% of the Council’s current
recycling rate of 46.6%, with approximately 22,000 tonnes collected each year from
kerbside and recycling centres. The introduction of the charging scheme could
potentially have a negative impact on recycling rates depending on the level of uptake.
It should be noted however, that evidence from other local authorities suggests that
there is little or no impact upon recycling rates once implemented. It should be further
noted that grass and green waste is a sustainable product, and it is therefore
questionable as to why this is included in recycling statistics, as the focus should be on
non-sustainable items. 
3. Measures of success 
3.1 Improvement in the efficiency of waste collection.
4. Supporting documentation 
4.1 Appendix 1 – Frequently Asked Questions
4.2 Appendix 2 – Terms and Conditions
4.3 Appendix 3 – Your Household Waste and Recycling Service
Page 19 of 102

Page 20

Lyall Rennie
Chief Officer (Community Operations)   
5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts been discussed and agreed with
Finance?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact?
There is an anticipated income generation from the introduction of this charge. The
exact level will be dependent on the levels of uptake across the local authority
area.
5.3 HR policy impact
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
Page 20 of 102

Page 21

5.5 Data protection impact
Does the report / project / practice contain or involve the processing of personal
data?
Yes ☒ No ☐
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☒
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk
Yes ☒ No ☐
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact?
Continued use of the councils CRM system to management the payment.
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
There is a potential for additional garden waste to be disposed of through the
residual waste stream and an overall reduction in the Council’s recycling levels.
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
A communication campaign will be implemented to ensure all residents who have a
food/garden waste bin are aware of the charge
5.9 Risk impact   
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
There is a risk the councils recycling rate could fall significantly.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒
Page 21 of 102

Page 22

If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out?
Page 22 of 102

Page 23

Appendix 1
Read our garden waste permit FAQs. 
Why has the charge for garden waste been introduced? 
While there is a legal obligation for us to collect food waste, the same legal obligation doesn't apply to garden
waste. 
Along with many other local authorities, we're facing significant budget challenges and to ensure key frontline
services are protected, we've introduced this charge for residents who wish to continue to have their garden
waste collected. 
The price for the 2025/26 permit is £40.00. 
How do you apply for a garden waste collection permit?  
You can apply for a garden waste collection permit online (weblink text).  Applications can be made between
April and November. 
How far in advance do I need to apply for a permit?  
It can take up to 21 days for a permit to be processed and the bin sticker to be issued to your address. Your
bin will not be lifted until the permit is attached.  
Can residents purchase more than one permit for garden waste? 
Yes. There is no limit to the number of permits a household can purchase.  
How many collections will this involve? 
Your brown bin will be collected fortnightly with the exception of the Christmas and New Year period.  Please
refer to the council website for more information on collections over this period. 
2025/26 permits should be displayed from 1 June 2025. 
How do I attach the permit to my bin? 
When your permit arrives, peel the permit from the backing paper and attach the sticker to the back of your
brown bin, between the handles. The sticker must be applied to a clean dry, surface and not over an existing
sticker. 
What if my permit hasn't arrived yet? 
Once you have purchased your permit it can take up to 21 working days to arrive. 
If 21 working days have passed and you haven't received your permit, please log your issue
INSERTLINKTOWEBPAGE 
Your collections will begin when your permit is attached to your brown bin. 
Does payment of council tax not pay for garden waste collection? 
No, this service is non-statutory and therefore not a legal requirement for the Council to provide.  
Do other councils charge for this service? 
The majority of councils in Scotland are either charging for garden waste collections, considering
implementing a charge or not collecting this waste at all.  
How can I dispose of food waste if I don't have a permit? 
Page 23 of 102

Page 24

Food waste can be put into the brown bin and this will be collected fortnightly. 
If you use your brown bin for food waste only, then don't have to do anything. Food waste only brown bins will
continue to be collected fortnightly weekly without the need to apply for a permit. 
How will you know if someone has paid for a permit? 
When you purchase a permit you will be issued with a sticker that must be attached to your brown bin. The
permit sticker will include your address, so can't be used on bins at different addresses. Sticking the permit to
your brown bin indicates to the collection crew that you have subscribed to the garden waste service. 
What happens if residents don't purchase a permit and continue to place garden waste in their brown
bin? 
Our teams will undertake checks to ensure there is no garden waste in the brown bin if a permit sticker isn't
attached. If it's found that garden waste has been put into the bin and the resident hasn't paid for this service,
the bin won't be emptied. The bin will not be emptied and a tag attached providing information on how to
subscribe to the garden waste service. The resident will then need to dispose of the garden waste themselves
such as composting it or taking it to one of our household waste recycling centres.  
I don't want to pay for a permit, what are my options for disposing of my garden waste? 
Residents who don't want to purchase a permit can either dispose of their garden waste at one of our
household waste recycling centres or can compost it in their garden. Visit the Zero Waste Scotland
website for information on composting. 
Are there payment options or discounts for those in receipt of Universal Credit or other benefits? 
There are no discounts or exemptions available.  
What happens if residents receive an Assisted Pull-Out of their bins? 
The normal assisted collection service will continue for food waste collections. If residents in receipt of the
assisted collection service still wish their garden waste to be collected they must purchase a permit.  
What happens if I've a permit and my bin is missed? 
You can report a missed bin online. INSERT LINK 
If residents stay in a flat how does the scheme work? 
Residents who currently share a bin for their food and/or garden waste in flats can continue to do this for
garden waste as long as one of the residents applies and pays for the permit. 
Please note, the application and payment for a permit must be made by one resident and the Council won’t
become involved in any neighbour dispute over payment to another neighbour.  
What if I employ a gardener? 
If a resident employs the services of a gardener the waste is classified as commercial waste. The gardener
must take this away with them after finishing their work and dispose of this as commercially generated waste. 
What would happen if someone doesn't pay for a permit and uses another neighbour's bin to dispose
of their garden waste without their permission? 
This would be classified as fly-tipping and the individual would be risking a fine. You can report fly-tipping
online. 
With this new service will we not see an increase in fly tipping in North Lanarkshire? 
Councils who have already introduced this charge have found no evidence to suggest that fly tipping of Page 24 of 102

Page 25

garden waste has increased as a result. The disposal of garden waste is the householder's responsibility and
residents can continue to dispose of this free of charge at a household waste recycling centre.  
What happens if I don't initially purchase a permit and I want to join at a later date? 
There will be no discount depending on the time of year when you sign up to the scheme. If existing residents
or new residents to North Lanarkshire choose to join the scheme part way through the year the charge will still
be the full cost of the permit. 
What happens if I move house? 
The permit is issued for the household only, not to a named individual, and isn't transferable. 
What happens if my brown bin needs replaced? 
If it is damaged by our collection crew North Lanarkshire Council will reorder a replacement bin and permit for
you, you do not need to contact us this will be arranged automatically. If you have purchased a permit then a
replacement will be issued to you. 
If your bin or permit is damaged in some means other than by our collection crew or vehicle you should
reorder and pay for a replacement bin and or permit online  
What can I put in my brown bin?  
• Flowers  
• Plants  
• Grass cuttings  
• Shrub/Hedge clippings  
• Leaves  
• Weeds (not invasive plants like Japanese Knotweed)  
• Twigs/Branches  
• Straw or animal bedding  
• Food Waste  
Is this a mandatory charge?  
No, the charge is discretionary. It will be your own decision if you wish to purchase a permit to have your
garden bin emptied 
Page 25 of 102

Page 26

Appendix 2 
North Lanarkshire Council Garden Waste Service Terms and Conditions 
1. Introduction 
1.1. These terms and conditions apply to the North Lanarkshire Council garden waste collection service,
provision of the Permit and online application processes which together form a contract between the
Customer and the Council. 
1.2. By applying for this Garden waste collection Service, you accept these terms and conditions
including any Payment charges. 
2. Eligibility 
2.1. North Lanarkshire Council Garden Waste Service is for domestic properties or Places of
worship.  The service is NOT available to other persons, companies or commercial businesses.  
2.2. The Garden Waste Service is for the collection of organic garden waste that is presented in a brown
140/240 Litre wheeled bin.  
2.3. To qualify the Customer and their property must be on a pre-existing Council Brown bin collection
route, have adequate storage space for wheeled bins within the curtilage of their property and be
able to accommodate the wheeled bins at all times. 
2.4. The service is only provided to the collection address specified in the customer’s application and
permit.  If you move home - please leave the bin at the property. If you are moving into an area
which provides the garden waste collection service and there is no permit sticker on the garden
waste bin at the new address, you will be required to apply for a new permit sticker.   
3. Prices and Contract Period 
3.1. The annual charge for the garden waste bin collection is £40.00 per bin emptied on a fortnightly
basis, excluding the period of week of 24 December to week of 6 January as no garden waste bin
collection will take place during that time. 
3.2. Application period for applying for a permit is from 1st April – 30th November. 
3.3. The charging term lasts for a period of 12 months from 01 June to 30 May. The contract with each
Customer runs from the date of Permit purchase until the end of the charging term i.e., 30th May. 
3.4. The collection period is for all year with the exception of 2 weeks over the festive and New Year
period, exact dates of this period will be published on the council website each year and collection
calendars can be found by visiting When is my bin emptied? | North Lanarkshire Council. 
4. Annual Review of Charging 
4.1. The Council reserves the right to vary the charge of the service.  Charges are set annually, and the
Customer will be notified of any price increase as part of the annual renewal. 
5. Exemptions 
5.1. There are no exemptions to the scheme. 
Page 26 of 102

Page 27

6. Permits 
6.1. A valid Permit is required for each individual wheeled brown bin presented for collection. 
6.2. Customers must have adequate storage space for wheeled bins within the curtilage of their property
and be able to accommodate the wheeled bins at all times. 
6.3. Expected delivery time of the permit from purchase to delivery is 21 days. Your bin will not be
emptied during this period unless the permit has arrived and is on the bin.  
6.4. There will be no pro rata payments for customers that wish to join the service part way through the
year and no refunds or part refunds for the cancellation of the service part way through the year.  
6.5. There is a 14-day cancellation period for the Contract which starts on the day after purchase of the
Service. If cancellation is made during this time frame, a full refund will be provided. Thereafter, it
can be cancelled at any time, but no refunds or part refunds will be given.  
6.6. To ensure your collections continue uninterrupted, payment is required every year in advance, using
the online form. You will be notified of the charge and payment date in March each year. If you don’t
pay by the specified date, we will withdraw our service until such time as you re-join the scheme.  
6.7. When garden waste bins are presented for collection the permit sticker must be clearly visible to the
collection crew as shown in the instructions detailed in the letter posted with the permit.  
6.8. Permits are issued detailing the individual property information; they are non-transferrable and only
valid when presented at the property for which they were originally purchased.  
6.9. The Council has no obligation under this contract to empty wheeled bins where they do not comply
with these conditions. 
6.10. If wheeled bins are inaccessible, or the passageway is determined as having the potential to cause
risk or harm to the health of Council employees, then the waste will not be collected, and the
Customer shall be required to ensure that the hazards are removed, or conditions improved before
the next scheduled collection. 
7. Wheeled Bin Presentation 
7.1. Bins must be presented at the kerbside from 7am on the day of collection. Please make sure the bin
handle is facing the street.  
7.2. Collection crews will not empty any bin that does not display a valid current permit sticker.  
7.3. After the bin is emptied, it will be returned to the point of collection. It is your responsibility to make
sure that the bin is returned to your property.  
7.4. Your garden waste bin(s) must be used for garden and food waste only. Garden waste includes
grass, cuttings, hedge clippings, twigs, bark, leaves, straw, hay, flowers, plants and small branches.
Your garden waste bin should NOT be used for large branches, turf, earth, soil, stones, gravel etc.
The garden waste must not be placed in plastic bags, as this affects the composting process.  
7.5. The Council reserves the right not to empty bins in the following instances: -  
• Bins contain incorrect materials  
• Bins are too heavy to safely manoeuvre  
• Waste is heavily compacted or frozen 
• Bins where the bin lid is not closed  
• Bins from commercial premises   Page 27 of 102

Page 28

• Valid permit is not displayed on the bin 
7.6. If wheeled bins are inaccessible, or the passageway is determined as having the potential to cause
risk or harm to the health of Council employees, then the waste will not be collected, and the
Customer shall be required to ensure that the hazards are removed, or conditions improved before
the next scheduled collection. 
7.7. If your bin is damaged during collection or if it falls into the rear of a refuse vehicle, we will repair or
replace it free of charge and order you a replacement permit on your behalf, you do not need to
contact us to arrange this.  
7.8. The Council reserves the right to alter customer collection day.
7.9. The Council reserves the right to inspect bins and their contents at any time to ensure proper use.   
8. Contamination of Recycling Bins or Non-Permitted Waste 
8.1. Contaminated bins (i.e bins containing incorrect material(s) will not be emptied. If your bin is
contaminated, it is your responsibility to remove the item(s) of contamination prior to the next
collection. If the contamination continues, we may remove the bin(s) and no refund applied. 
8.2. The bin lid(s) must be completely closed, and no side waste will be collected, i.e. no extra waste next
to the bin(s) or placed on the lid(s). If the bin is too heavy to be lifted safely, the householder will be
expected to remove some garden waste making it safe to lift for the next scheduled collection. 
8.3. If there is repeated Contamination in Brown bins used for this Service, the Council reserves the right
to withdraw the Service from the Collection address. The Customer will be notified of this decision in
writing. 
8.4. The Customer is not eligible for a refund of the Payment where the Service is withdrawn for reason
of Contamination. 
9. Missed Bin Collections 
9.1. Refunds will not be given if a collection is missed through circumstances beyond the control of the
Council. 
9.2. Bins should be placed at the kerbside or agreed collection point by 7.00am on the scheduled
collection day for that bin. The Council will not return for bins missed due to late or incorrect
presentation. It will be the resident’s responsibility to dispose of any excess waste, either free of
charge at a Household Waste Recycling Centre or by arranging a chargeable special uplift (waste
removed from in and bagged for uplift). 
9.3. Where the bin has been missed due to a collection error, this should be reported online at the
councils website Report an issue with a bin | North Lanarkshire Council. If the Council agree that the
cause of the missed bin was a collection error the bin should remain at the collection point, the
Council will aim to collect it within 7 days. If after this time the vehicle has been unable to return the
bin should be returned to the storage point and represent on the next scheduled collection day for
this bin.   
9.4. If wheeled bins are inaccessible, or the passageway is determined as having the potential to cause
risk or harm to the health of Council employees, then the waste will not be collected, and the
Customer shall be required to ensure that the hazards are removed, or conditions improved before
the next scheduled collection. 
Page 28 of 102

Page 29

10. Household Waste Recycling Centres 
10.1. The Customer is entitled to use the Council's Household Waste Recycling Centres to dispose of
domestic Garden Waste free of charge. 
10.2. For further information, please visit our Household Waste Recycling Centre webpage Recycling
centres | North Lanarkshire Council. 
11. Shared Bins or Multiple Bins at a Specific Property 
11.1. If you wish to share a wheeled bin with one or more neighbours, you must agree one person who
will register and pay for the collection service. It will be the responsibility of that group of neighbours
to arrange their own payments among themselves and to ensure the wheeled bin is presented on
the correct days. 
11.2. There is no limit to how many wheeled bins you can register and pay for at an address. The charge
will be applied for each wheeled bin. 
12. Industrial Action 
12.1. In the event of cancelled or suspended garden waste collections e.g. due to industrial strike
action/inclement weather, collections will commence on resumption of service provision.  No refunds
will be offered for collections missed due to these occurrences. 
12.2. Garden waste collections will recommence once the reason for the service disruption  has ceased.
Information regarding any additional collections will be communicated via the website and social
media channels. 
13. Data Protection 
13.1. To deliver this Service, we need to collect Customers' Personal data including the: 
• Customer's name 
• Collection address 
• Billing address 
• email address 
• telephone number 
• Payment details
We use this data: 
• for Customers to pay for the Service 
• to provide Customers with the Service 
• to manage and administer the Service 
• to contact Customers about changes to the Service 
• to contact Customers when their Service is to expire and to offer a renewal 
• to improve the design and performance of the Service 
• to investigate complaints 
• to manage the finances of the Service 
• to recover money Customers may owe us. 
13.2. The Council's privacy policy sets what information we collect, how we collect it, what we do with it,
who we share it with and why Privacy and cookies | North Lanarkshire Council. 
Page 29 of 102

Page 30

14. Service Requests, Enquiries and Complaints 
14.1. For any service requests please report online Bins and recycling | North Lanarkshire Council 
14.2. The Council is committed to providing high quality services, if something goes wrong or you are
unhappy with our services, please tell us. 
14.3. To make a complaint - visit our website https://www.northlanarkshire.gov.uk/bins-and-
recycling/report-issue 
15. Additional Information 
15.1. The scheme is voluntary. There is no requirement for residents to participate. 
15.2. Further information and Frequently Asked Questions relating to the garden waste collection service
can be found at INSERT WEBPAGE  
15.3. Please note these Terms and Conditions are subject to change at the Council’s discretion without
notice. The current version will be held online at INSERT WEBPAGE 
15.4. The Council Garden Waste Collection Service including the Permit and these Terms and Conditions
will be governed by the Law of Scotland and subject to the exclusive jurisdiction of the Scottish
Courts.      
Page 30 of 102

Page 31

Appendix 3 
Your Household
Waste & Recycling
Service
November 2024
Page 31 of 102

Page 32

Household Waste & Recycling Policy  2
North Lanarkshire Council Household Waste and Recycling Policies 
1.1 The Council’s policy is to provide households with the following waste and recycling
containers where practicable and bins are provided are at a charge to the resident.
• One 240 litre grey wheeled bin for the storage of general domestic (non-recyclable) waste
• One 240 litre blue lidded wheeled bin for the collection of paper & card
• One 240 litre green lidded wheeled bin for the collection of plastics, metal and glass
• One 240 litre brown lidded wheeled bin for the collection of food waste (and garden waste if a permit
is purchased to participate in the collection service)
1.2 Additional recycling capacity will be provided at a charge to the resident if required, up to a
maximum of two 240 litre (blue/green) wheeled bins per household. Alternatively, one single larger
container (360 litre capacity) may be provided. 
There is no limit to the number of garden waste permits that can be purchased by a householder
however each brown bin presented must have a permit affixed to ensure it is collected.
1.3 Bins that are damaged during collection by our crew our vehicle will be replaced without charge. 
Where a bin is damaged through wear and tear, negligence or is stolen, the householder will be liable
for cost of replacement.
1.4 New build properties will be required to purchase their bins prior to receiving a 
service. The most up to date cost of containers can be found of the fees and charges 
section of the Council’s website. Bins should be ordered via our website. 
1.5 Only wheeled bins supplied by North Lanarkshire Council will be emptied. 
2. Additional Non-Recyclable Waste Capacity
2.1 North Lanarkshire Council will consider providing additional capacity for non-recyclable waste to
householders meeting the following criteria and demonstrating recycling of waste;
• five or more permanent residents in the household
• 2 or more children aged 3 or under in disposable nappies
• exceptional circumstances at the discretion of the Waste Services Manager.
2.2 Households considered eligible for additional capacity will be provided with a larger (360L) grey
wheeled container for non-recyclable waste.
2.3 Additional capacity will only be provided on evidence that the householder is making full use of the
kerbside recycling services and utilise 360l recycling bins.  Householders will be required to complete
and return a waste diary for a period of three weeks.
2.4 Applicants are required to re-register on a biennial basis.
2.5 Householders must notify the Council if circumstances change during the 24-month
agreement period which may alter their eligibility for additional non-recyclable waste 
capacity. 
3. Presentation, Storage and Collection
Page 32 of 102

Page 33

Household Waste & Recycling Property  3
3.1 The householder is required to present the appropriate bin(s) with the lid closed, handles facing
the kerb at the kerbside (or agreed uplift location) by 7:00am on the morning of collection.
3.2 The collection crew will not return for bins that are not presented in time. Bins not 
presented in time for uplift should be returned to the storage location and represented on the next
scheduled collection day for that bin.
3.3 Bins should be presented in such a way that they do not cause obstruction to 
pedestrians or road users.
3.4 Side waste or excess waste will not be accepted i.e. excess bags, cardboard boxes 
etc other than in circumstances communicated by the Council.
3.5 Overfilled and/or excessively heavy bins will not be accepted. Bins with items 
wedged into them will be left as these may present health and safety implications to 
operatives. The resident should rectify the issue and correctly re-present their bin on 
the next scheduled collection day for that bin.
3.6 Any excess recyclables or non-recyclable waste that cannot be accommodated 
within the appropriate bin(s) can be taken to a Household Waste Recycling Centre. 
See point 9.1 for location details.
3.7 Bins must be stored where possible within the curtilage of the property i.e. bin store, 
back court, garden etc.
3.8 Bins must be removed by the householder from the pavement/collection point and 
returned to storage location as soon as practical after emptying i.e. the same day as 
collection.
3.9 The Council reserves the right to remove any unauthorised bins presented or left on 
the pavement, if previous requests for householder co-operation in removing them 
are not adhered to.
3.10 Residents are advised to identify their bins with a house name or number.
3.11 Householders are responsible for ensuring the correct materials are placed in the appropriate bin
(see point 5.1).
3.12 The cleanliness of bins (inside and out) remains the responsibility of the resident and they should
be maintained in a clean and hygienic condition at all times Bin should presented in a serviceable
condition- all wheels in place, lid intact and no damage to the body of the bin. Unclean, unhygienic or
damaged bins may not be emptied.
3.13 Bins will be replaced after emptying by collectors to the original collection point, or 
within one refuse collection vehicle length of this location, ensuring adequate space 
for pedestrian movement and vehicle access to properties is maintained.
3.14 Access for the Refuse Collection Vehicle should be maintained clear of obstruction on uplift
days. Failure to do so may result in a missed collection, see point 6.3. Repeated missed bins due to
access issues will result in collection arrangements being reviewed.
4A. Assisted Collections
Page 33 of 102

Page 34

Household Waste & Recycling Property  4
4a.1 An assisted collection service will be provided when, due to physical or 
health condition no member of a household is able to present or retrieve their own 
bin(s) and have no other means of support to do this. This service is free of charge 
to people who qualify for it. You may be visited by a council officer to check your 
eligibility for the scheme.
4a.2 Applicants must apply for this service via the North Lanarkshire Council website and may be
required to provided evidence to support their application in the form of letter from a health or social
care professional and are required to re-register on a biennial basis.
4a.3 Bins will be collected from an agreed location within the curtilage of the property. All 
properties are risk assessed by a Council Officer to determine the manual handling 
risks associated with uplifting bins. Should a perceived risk be identified, it may 
necessitate a change to where the bin is stored to facilitate the safe collection and return of the bin. 
The bin must be at the agreed collection point to ensure uplift.
4a.4 Residents are required to ensure the bin storage area is easily accessible to the collection
crews. Gates should be unlocked and in good working condition to allow access. 
Dogs should be secured elsewhere to allow staff safe access to the property and access paths must
be clear of dog excrement.
4a.5 When moving house, it is important that residents who receive an assisted collection inform the
Waste Services so that records can be updated.
4a.6 Assisted collections will be reviewed on a biennial basis. If a household’s 
circumstances change and, as a result, they no longer need an assisted collection, 
residents or a representative must inform waste services. 
4B. Health Condition Collections
4b.1 An additional collection service will be provided when, due to health condition a member of a
household produces additional quantities of non-recyclable waste.  No additional bin will be provided
however the grey non-recyclable waste bin will be emptied every week, waste placed in the bin
should be double bagged. 
This service is free of charge to people who qualify for it;
4b.2 Applicants must apply for this service via the North Lanarkshire Council website and are required
to provide evidence in the form of a letter from a health or social care provider to support their
application. Applicants must re-register on a biennial basis.
4b.3 If the resident receives an assisted collection this will also be applied to the health collection.
4b.4 When moving house, it is important that residents who receive a health collection inform the
Council so that records can be updated.
4b.5 Health collections will be reviewed on a biennial basis. If a household’s 
circumstances change and, as a result, they no longer need a health collection, 
residents or a representative must inform the waste services. 
Page 34 of 102

Page 35

Household Waste & Recycling Property  5
4C. Simplified Collections
4c.1 If a resident has a health condition or disability that results in difficulties with recycling, we can
remove all recycling bins and provide a larger general waste bin that is collected on a three-weekly
basis. This service is free of charge to people who qualify for it. 
4c.2 Applicants must apply for this service via the North Lanarkshire Council website and are required
to provide evidence in the form of a letter from a health or social care provider to support their
application. Applicants must re-register on a biennial basis
4c.3 If the resident receives an assisted collection this will also be applied to the simplified collection.
4c.4 When moving house, it is important that residents who receive a simplified collection inform the
Council so that records can be updated.
4c.4 Simplified collections will be reviewed on a biennial basis. If a household’s 
circumstances change and, as a result, they no longer need a simplified collection, 
residents or a representative must inform the waste services. 
5. Contaminated Bins
5.1 Only waste or recycling materials detailed below will be accepted;
• Grey Bin – Non-recyclable Waste
• Blue Lidded Bin – Dry Mixed Recyclables – Paper & Cardboard
• Brown Bin – Food Waste and if permit is purchased garden waste is also accepted
• Green Lidded Bin – Dry mixed Recyclables– Plastics, Cans & Glass
Refer to www.northlanarkshire.gov.uk for more information on recycling
5.2 Householders are responsible for the waste and recycling that is contained in their 
bins. North Lanarkshire Council do not take responsibility for contaminated bins.
5.3 Contaminated bins will not be uplifted as they may contaminate the entire load within the vehicle
resulting in increased disposal cost and lower performing recycling rates against national targets
5.4 If contamination is found, the refuse collection crew will place a hanger on the bin, to advise the
householder, and record the contamination.
5.5 Contaminated bins will not be returned for and will only be emptied on the next 
scheduled collection day for that bin if the contaminants are removed.
5.6 Table 1 below is a guide to help determine whether a bin is deemed to be 
contaminated or not and the action to be taken  
Page 35 of 102

Page 36

Household Waste & Recycling Property  6
Table 1
Contamination level/Reason
Description Action
Contamination level/Reason
Description Action
Contamination level/Reason
Description Action
Severe contamination; or
repeat offender of medium
contamination (deliberate)
Filled black bags, food waste,
more non-recycling than
recycling. Or repeat offender of
medium contamination.
1) Do not empty bin 
2) Attach Bin Hanger/Sticker 
3) Record on handheld/in-cab
or route sheet
4) Letter sent to householder
Moderate contamination Obvious misunderstanding of
materials accepted (there
needs to be more recycling
than nonrecycling)
1) Empty bin on first instance 
2) Bin Hanger/Sticker 
3) Record on handheld/in-cab
or route sheet
Low contamination (non-
deliberate)
Low number of visible wrong
items when the bin lid is
opened.
1) Empty bin – likely that it is
accidental. 
2) No requirement to record 
5.7 North Lanarkshire Council reserve the right to withdraw the recycling service if repeat
contamination occurs. Any loss of recycling capacity by service removal (as a result of repeated
contamination) will not be replaced and non-recyclable waste collections will remain unchanged. 
6. Missed Bins
6.1 Bins should be placed at the kerbside or agreed collection point by 7.00am on the 
scheduled collection day for that bin. The Council will not return for bins missed due to late or
incorrect presentation. It will be the resident’s responsibility to dispose of any excess waste, either
free of charge at a Household Waste Recycling Centre or by arranging a chargeable special uplift
(waste removed from in and bagged for uplift).
6.2 Where the bin has been missed due to a collection error, this should be reported online at the
councils website Report an issue with a bin | North Lanarkshire Council .If the Council agree that the
cause of the missed bin was a collection error the bin should remain at the collection point, the
Council will aim to collect it within 7 days. If after this time the vehicle has been unable to return the
bin should be returned to the storage point and represent on the next scheduled collection day for this
bin.  If it is found that the missed collection was not due to collection error we will not return to empty
the bin.
6.3 Where the bin has been missed due to access issues, there is no need to report this as the
collection vehicle will return to attempt to service the bins. If the access issue is the result of road
closure they will return as soon as access allows.  If access is blocked by parked cars the collection
vehicle will make a maximum of two further attempts to collect the bins however If after this time the
vehicle has been unable access the bins, the resident should return their bin to the storage point and
represent the bin on the next scheduled collection day for that bin. Excess waste or recycling can be
taken to a Household Waste Recycling Centre for disposal.
6.4 Adverse weather or other conditions beyond the Council’s control can disrupt 
Page 36 of 102

Page 37

Household Waste & Recycling Property  7
collections. In such circumstances collection arrangements will be made as soon as 
possible and householders should leave their bins out for 2 days after the normal 
collection. If bins are not collected within this time, please refer to the Council’s 
website for collection updates.
6.5 If bins are not emptied due to waste being tightly lodged or frozen, the bin will not be 
collected until the next scheduled collection day for that bin and excess waste will not be accepted. 
Householders must ensure that the waste can be removed from the bin and any items are dislodged
before re-presenting.
7. Non-Standard Waste and Recycling Services
7.1 There are variations to the standard waste and recycling service outlined above for practical or
operational reasons e.g. a large proportion of flats share bins for refuse and recycling due to restricted
storage space. 
High flats and maisonettes (with bin chutes) use large communal bins and have a local mini recycling
points.
The most appropriate size and type of bin will be identified from the list below and are / will be
provided :
Flats
• Individual or communal grey wheeled bins (240 or 360 litre capacity) – residual, 
non recyclable waste
• Individual or communal blue lidded wheeled bins (240 or 360 litre capacity) – paper and cardboard
• Individual or communal green lidded wheeled bins (240 or 360 litre capacity) - plastics, cans and
glass
• Large communal grey 1100 litre bins – residual, non recyclable waste
• Large communal blue lidded 1100 litre bins – paper and card
• Large communal green lidded 1100 litre bins – plastics, cans and glass
• Brown-lidded communal wheeled bin for food waste 240 litre
High Flats
• Communal large bins (weekly / multi frequency)
• Local mini recycling sites with 1100 litre blue lidded & green lidded bins
• Brown lidded 240 litre wheeled bins for food waste 
7.2 Additional recycling capacity will be provided if possible, this will be assessed by a waste officer
on a site by site basis. 
7.3 Additional capacity for non-recyclable waste will only be provided as detailed in section 2 of this
Household Waste and Recycling Policy. 
8. Special Uplift/Bulky Uplift Collections
8.1 The Council also provides a waste collection service for certain large or bulky items. 
Page 37 of 102

Page 38

Household Waste & Recycling Property  8
8.2 The Council charges for collection of bulky waste items. An up-to-date list of fees and charges is
available on the website. Bookings can be made via the website. 
8.3 The items must be booked in for collection and will only be collected if they are an on the list of
accepted items and are presented as per the council’s terms and conditions published on the
Councils website. 
8.4 Waste electrical items (WEEE) and waste upholstered domestic seating (WUDS) is included in the
list of accepted items and will be collected in a separate collection vehicle from other items in the
special uplift to ensure compliance with legislation for these waste streams. 
9. Household Waste Recycling Centres
9.1 The Council operates 6 household waste recycling centres (HWRC) at the following 
locations:
• Stobcross
• LadyAnne
• Wardpark
• Shotts
• Reema Road
• Netherton
A full list of items accepted at each site and opening hours can be found on the 
Council’s web site.
9.2 Household Waste Recycling Centres are provided for use by North Lanarkshire Council residents
and for the recycling and disposal of household waste only. There is no provision for commercial
waste at any site.
9.3 Residents wishing to use a commercial style vehicle (van, pick up, trailer or mini bus) to dispose
of their waste must prebook their visit online at the council website prior to admission to the site.  A
maximum number of 12 visits are permitted each year for each resident.
9.4 Waste is subject to inspection by a member of staff. If waste is suspected to be 
commercial in origin it will not be permitted access to the site. 
10 Variations to the provision of Household Waste & Recycling Service
10.1 Recognising that there may be instances whereby conditions might be exceptional, 
variations will be considered if one or more of the following conditions exist:
• The property is not on a garden waste collection route and therefore does not 
have access to the food waste service.
• Where wheeled bins for recycling cannot be accommodated and/or serviced.
• Where travel is required up a private and/or un-adopted road.
• The Council has authorised another receptacle, container or sack in the 
absence of a wheeled bin.
• In exceptional circumstances as determined by the Waste Services Manager.
Page 38 of 102

Page 39

Household Waste & Recycling Property  9 
11 Rural Collection Services
11.1 North Lanarkshire Council do not have any obligation to provide all properties with the full range
of kerbside services in circumstances where this would present significant operational and/or cost
implications. 
12 Communal Containers
12.1 Communal containers will be provided if it is not feasible to provide each individual 
property within a flatted premise/multi occupancy dwelling with their own containers 
to store waste and recycling.
12.2. Communal containers will be provided at an agreed bin storage location, where the refuse
collection vehicle cannot gain access to 
multiple properties to service bins because of the road width, height limitations, inadequate turning or
other restrictions out with the Councils control.
12.3 Communal bin collection points should be a level hard standing surface, a maximum of 10
metres from where the refuse collection vehicle can safely stop. To enable servicing a suitable
surface over which the communal containers can be manoeuvred to the rear of the vehicle must be
maintained. 
13 Access Road Specification
13.1 Refuse Collection Vehicles will only provide kerbside waste and recycling collections to
properties situated on a private and / or unadopted road if all of the following conditions are met:
• The private road serves a settlement, or settlements, rather than isolated 
individual properties (as a guide, a settlement is a grouping of six or more 
properties).
• The road is constructed to withstand a gross vehicle weight of 26 tonnes and 
axle loading of 11.5 tonnes. Features in the road situated, such as manhole 
covers, gratings or cattle grids, must also be capable of withstanding these 
loads.
• There is sufficient space for a refuse collection vehicle to safely access and 
egress; with adequate space to turn, if applicable (i.e. a turning circle, T-junction or hammerhead).
• The road surface must be in a condition deemed acceptable by North Lanarkshire Council and this
standard must be maintained (i.e. any surface deterioration such as ruts or potholes must be
improved and the road must be cleared/treated in adverse weather).
• Sufficient and safe access for the refuse collection vehicle on collection day 
(i.e. absence of overhanging branches/overgrown bushes, no parked cars 
restricting space available to perform manoeuvres).
• The owner(s) of the private road agrees to indemnify the Council against 
Page 39 of 102

Page 40

Household Waste & Recycling Property  10
any damage caused from reasonable use of the road by a refuse collection 
vehicle.
13.2 Failure to meet any of the above conditions will prevent the refuse collection vehicle from
servicing bins and result in collection arrangements being reviewed. 
Page 40 of 102

Page 41

North Lanarkshire Council
Report
Environment & Climate Change Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    JMcK/LS Date 05/02/25 
Public Sector Duties Climate Change Report 2023/2024 
From James McKinstry, Chief Officer of Assets & Procurement  
E-mail McKinstryJ@northlan.gov.uk Telephone 07939 281102 
Executive Summary
The purpose of this report is to provide committee with a summary of the content of the
Public Sector Report on Compliance with Climate Change Duties submitted on behalf of
the Council in November 2024 for reporting year 2023/24 as well as provide an update on
progress against carbon budgets set within our Climate Plan ACT2030 and aspects of the
Sustainable Futures Programme of Work. 
For the reporting year (2023/24) the carbon boundary was expanded to include staff
commuting and refrigerants and resulted in a footprint of 62,124 carbon tonnes equivalent
(tCO2e). Measuring the original boundary against the baseline showed that there was a
continued decrease in emissions with an overall reduction of 1.4% from the previous year’s
report and an overall reduction of 48.5% from the baseline year of 2015/16. 
The report also highlights the need to retain the Climate Plan ACT 2030 carbon targets
and budgets until the publication of our ‘Net Zero Pathway’ later this year.  
Recommendations
It is recommended that Environment & Climate Change Committee: 
(1) Review the performance presented within this report and accompanying
appendices;
(2) Agree to retain the Climate Plan ACT 2030 targets and carbon budgets for 2024/25
and 2025/26 to enable continuity of performance monitoring; and
(3) Acknowledge that the aforementioned climate plan will be replaced by a Net Zero
Pathway and will be brought before this Committee in autumn 2025. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Sustainable Futures
Item 4
Page 41 of 102

Page 42

1. Background
1.1 The ‘Climate Change (Duties of Public Bodies; Reporting Requirements) (Scotland)
Order 2015’, introduced a legal obligation for public bodies to report annually detailing
their compliance with the duties specified in the Climate Change (Scotland) Act 2009
and its subsequent amendments. The report is produced annually for the most recently
completed financial year with a submission date of the 30th November.
1.2 Each year information and data are collated and verified for submission by individual
services. The report template is comprised of a number of sections which are mainly
descriptive of the organisation:
• Profile;
• Governance;
• Emissions and Projects;
• Adaptation;
• Procurement;
• Validation; and
• A non-mandatory section: Wider Influence.
1.3 Committee will recollect in last year’s reporting that they were advised that the
organisational carbon boundary (a list of the emissions that is reported) would increase.
This is in line with the ‘Public Sector Leadership on the Global Climate Emergency’
2021:
‘There is now a strong demand among the sector for robust, consistent and
comprehensive measurement and reporting of the entire carbon footprint of public
bodies to support the accelerated action now needed.’
Figure 1 North Lanarkshire Council's Carbon Boundary as amended (2023/24) 
1.4 Environmental Standards Scotland (ESS) were tasked with a review of the systems in
place to support local authorities in their duty to contribute to the delivery of the national
climate change targets and this included reporting requirements. The Climate Change
Lead Officer participated in workshops hosted by ESS and raised a concern with regard
to the validity of data and appropriate methodologies. One of the five recommendations
made by ESS to the Scottish Government was the mandatory reporting of Scope 3
emissions. Whilst this recommendation was rejected, the current guidance encourages
Page 42 of 102

Page 43

organisations such as local authorities to increase their reporting of this scope e.g.
procurement, staff commuting. Accurate reporting of procurement consumption is
currently beyond most organisation’s ability and has led to some contracting
consultants to carry this work out on an annual basis. The Council continues to
endeavour to improve on what is reported utilising a common-sense approach and as
a result this year’s boundary (Figure 1) includes staff commuting and refrigerant gases.
As commuting information is not a retained internal data set, a national one has been
used to assist in the calculation of this emission source. The methodology developed
will be consistently applied each year or until there is national guidance available on
the use of alternatives.
Net Zero Pathway
1.5 In support of the 2019 climate emergency ambition to realise net zero by 2030, the
Climate Plan ACT2030 was published in 2021 and included a series of thematic carbon
budgets that were intended to drive down the Council’s scope 1 and 2, as well as scope
3 emissions and were based on project information provided by the relevant
services/teams. Meaningful climate action is underway in key areas within the Council
Within our Sustainable Futures Programme of Work Board we have committed to
producing a new net zero pathway next calendar year which will contain costed actions
resulting in a realistic timescale and targets.
1.6 Work on this commenced in August 2024 with a workshop that key officers and chief
officers attended at Gartlea Community Centre. Considering the ‘road ahead’ for the
built environment and transport and planning in terms of legislative levers, attendees
were asked to consider the following:
• What action should the Council focus on and where should our resources be
prioritised?
• What should we be doing to ensure our priorities align with our duties e.g.: 
o Climate targets
o Heat in Buildings
o National Planning Framework 4
o Reduction in car use
• What are your thoughts on the opportunities/challenges we face? In particular:
o Funding
o Changing and dynamic legislation/expectations
o Influencing the balance between public sector and private sector action; and
o Ultimately how do we deliver the pathway to net zero?
• What are our immediate next steps following these discussions?
1.7 The responses to these questions will assist in the development of the net zero pathway
and will be further explored when individual services offer their contributions to the
action plan.
1.8 A draft climate plan template (Appendix 3) has been developed by ESS on behalf of
the Scottish Government with the intent that as local authorities update their climate
plans, the format can be adopted. It is expected that this will be on a voluntary basis
initially with an eventual ‘hard stop’ date. Due to the timing of the council’s next plan
i.e. the Net Zero Pathway, officers involved have opted to adopt the template to negate
the need for unnecessary rework of what will be a live document. 
Page 43 of 102

Page 44

2. Report
2.1 This report focuses primarily on the performance of the Council in reducing its carbon
emissions as contained within the November 2024 submission. Appendix 1
(Organisation Targets) and Appendix 2 (Breakdown of Emissions) supplement the
content of this report. The full submission will be available on Sustainable Scotland
Network’s website in March 2025. 
2.1.1 This report also contains a short review of performance against the council’s
own carbon budgets set within the Climate Plan ACT2030 as adopted.
2.1.2 To fully understand the content of this report Committee should be aware of
the following definitions:
Table 1 Explanation of Emission Scopes
Scope Organisational
Control
Emission Source Example
1 Direct Stationary combustion Fuel use in buildings
Mobile Combustion Fuel use in vehicles
Process emissions  Water treatment processes
Fugitive emissions Leaks of refrigerants from cooling
systems
2 Indirect Purchased electricity,
heat and steam
Grid electricity use
3 Indirect Several sources Purchased goods and services
Employee commuting and
business travel
Waste 
Public Sector Climate Change Duties Report 2023/24 
Figure 2 Total NLC Emissions by Scope (tCO2e)
2.2 The Council’s greenhouse gas emissions for this reporting year totalled 62,124 carbon
tonnes equivalent (tCO2e). This is comprised of 60,352 tCO2e of emission sources
baselined in 2015/16 and 1,772 tCO2e from those introduced this reporting year into
our carbon boundary. It is clear that over the past four years the organisation’s
emissions have plateaued, and it is believed that this is consistent with other public 
-
20,000
40,000
60,000
80,000
100,000
120,000
Scope 1 Scope 2 Scope 3
Page 44 of 102

Page 45

bodies. This suggests an upscale in effort including financial resources is required to
meet the council’s climate change duties.
2.2.1 From this point forward in the report we will focus on the footprint which is in
line with the organisation’s 2015/16 baseline.  
Table 2 NLC's Footprint since Baseline Year (tCO2e)
2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24*
117,075 112,341 121,723 97,900 77,113 59,852 62,770 61,909 60,352
Performance
v. baseline
-4,734 4,648 -19,175 -39,962 -57,223 -54,305 -55,166 -56,723
% change to
baseline
-4.0% 4.0% -16.4% -34.1% -48.9% -46.4% -47.1% -48.5%
change to
prev. year
-4,734 9,382 -23,822 -20,788 -17,260 2,917 -860 -1,557
% change to
prev. year
-4.0% 8.4% -19.6% -21.2% -22.4% 4.9% -1.4% -2.5%  
2.2.2 The above table provides a summary of the organisation’s progress. Within
the reporting year (2023/24) emissions have reduced by 48.5% from the
baseline year.  2020/21 reflected the period where there was very little
activity (building use and grey fleet) as most staff were working from home
as a result of the restrictions in place due to COVID-19. Excluding this year
from the analysis shows that good progress was made up to 2021/22 and
thereafter it has been minimal.
2.3 The following graph shows the Council’s progress in terms of its Scope 1 emissions
since the baseline year.
Figure 3 Scope 1 Emissions since Baseline Year (tCO2e) 
2.3.1 Scope 1 emissions accounted for 28,211 tCO2e for the reporting period,
which was a 2.6% reduction from last year and was achieved through a 4%
reduction in the use of natural gas (for heating) by focussing further
efficiencies through the use of Building Energy Management Systems. The
full effect of this was dissipated through increased use of other sources such
as the fleets use of diesel and petrol.
2.3.2 Figure 4 shows the change in Scope 2 emissions since the baseline year. 
Electricity is the sole source of the council’s Scope 2 emissions. There was
an increase in consumption during the reporting year of 696,183 kilowatts,
an increase of 0.9% from the previous year. 
Figure 4 Scope 2 Emissions since Baseline Year (tCO2e) 
-
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
Page 45 of 102

Page 46

2.3.3 The graph below shows the organisation’s progress in reducing its Scope 3
emissions. As mentioned earlier within this report, work continues to identify
the extent of the council’s Scope 3 emissions. 
Figure 5 Scope 3 Emissions since Baseline Year (tCO2e) 
2.3.4 Scope 3 emissions for the reporting year are 28% lower than that of the pre-
COVID year (2019/20) and this can be attributed to a decrease in waste-to-
landfill and home working emissions. The overall reduction since baseline
year is 23,593 tCO2e (59.1%). There have been increases in some waste
streams however as they are related to recycling, they are viewed as a
positive i.e. contributing to the reduction in waste to landfill emissions which
per tonne incurs a larger emission factor. Whilst business mileage emissions
have continued to increase it should be noted that it accounts for only 6.1%
of Scope 3 emissions.
Climate Plan ACT2030: Progress against carbon budgets
Table 3 Carbon Budgets set with the Climate Plan ACT2030 (tCO2e)
Annual Reduction
Targets Buildings Transport Waste Annual Emissions
Target
Reduction
from baseline
2021/22 49,205 5,973 12,133 67,311 42.5%
2022/23 46,745 5,855 12,133 64,733 44.7%
2023/24 44,408 5,737 12,133 62,278 46.8%
2024/25 42,187 5,619 10,355 58,161 50.3% 
-
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
45,000
-
10,000
20,000
30,000
40,000
50,000
60,000
Page 46 of 102

Page 47

2025/26 40,078 5,501 10,355 55,934 52.2%
2.4 The Climate Plan ACT2030 contains the targets and carbon budgets that we currently
work to (Table 3). This section of the report examines the council’s progress against
these.
2.4.1 The council’s footprint (2023/24) including and excluding the new sources is
below the annual emission target of 62,278 tCO2e.  The original footprint
realised a 48.5% reduction from the baseline year. 
Figure 6 Thematic emissions performance (2023/24) 
2.4.2 The ‘Net Zero Pathway’ will provide the Council with new interim and annual
targets as well as carbon budgets beyond 2025, initially for a five-year period
but also beyond. Given that climate action has and will continue during the
Pathway’s development, it would be prudent for the Council to continue to
work to the targets within the Climate Plan ACTG2030 for 2024/25 and
2025/26 to enable continuity of performance monitoring.
Energy Policy
2.5 Committee will recollect that in last year’s report it was proposed that the Energy Policy
would be reviewed as it targets although well-intended were overly ambitious. This work
will now be incorporated within the new ‘Net Zero Pathway’ and will contribute to the
evidence base for revised building related emission targets.
Climate Action
2.6 This section highlights some of the Council’s Climate activity and actions. These
actions contribute to reducing North Lanarkshire’s emissions as well as encouraging
more sustainable practices within the area.
2.6.1 The City Deal Team (Place) have incorporated Carbon Management into
their large-scale infrastructure projects through project development and in
time, project delivery, to take account of the whole life cycle of a project,
developing carbon management plans, where appropriate, to manage the
impact of both the implementation and end use of the infrastructure.
2.6.2 Procurement. The councils 2023 – 2024 Procurement Strategy includes
provision as to how the council will procure the Supplies, Works and Services
that we need. In line with the legislative framework for sustainable public
procurement in Scotland; we incorporate the following sustainable
procurement objectives:
0
10,000
20,000
30,000
40,000
50,000
Building energy use
(tCO2e)
Transport  (tCO2e) Waste  (tCO2e)
Consumption 2023/24 Budget 2023/24
Page 47 of 102

Page 48

• we have updated our internal procurement rules, documents and 
toolkits to reflect the new legislation; and
• we will embed the use of sustainability tools within our procurement
processes (e.g. the sustainability test, the prioritisation tool and the
flexible framework).
2.6.3 Non-Domestic Energy Efficiency Project: For this project, the Council enters
into a performance guarantee contract which ensures that savings projected via
the delivery of various measures are assured. Due to the scale of the project
the current phase has continued over from last year. The project is due to be
completed later this month (February 2025) and will see energy conservation
measures such as insulation, LED lighting and solar panels that will deliver a
25% reduction in energy use within targeted buildings and a reduction of
911tCO2e in building related emissions.
2.6.4 North Lanarkshire Energy Advice Service: This Service is funded by the UK
Shared Prosperity Fund and is delivered by the Wise Group’s Home Energy
Advice Team (HEAT) on behalf of the Council. The Service is available to
vulnerable and/or fuel-poor households across North Lanarkshire that require
support to resolve any energy-related issue and struggling to pay their energy
bill. Advice and assistance are offered to households such as help reducing
energy consumption as well as energy debt advocacy. This Service is due to
conclude March 2025.
2.6.5 Work has continued and developed with volunteer groups at Greenhead
Moss and Palacerigg Country Park, together with 7 Lochs volunteers, in
carrying out practical conservation tasks as well as some path and pond
construction projects. These volunteers gain huge benefits in terms of mental
and physical health from being involved in these projects, often they are
individuals who have struggled with their mental health and these opportunities
provide a chance to reconnect with society and their environment.
2.6.6 The Council utilised funding from the Nature Restoration Fund totalling £556k
to deliver a number of projects such as the seeding of native wildflower
meadows in eight town parks and biodiversity enhancements in four cemeteries. 
2.6.7 The New Build Team continue to produce quality, energy efficient housing in
2023/24: 
• A record 335 homes delivered meeting minimum EPC B rating. 19 net zero 
homes delivered.
• First housing project in North Lanarkshire to utilise a ground source heat
pump system commenced on site. 
• Zero-emission heating systems installed on several major housing sites.
• Renewable technologies such as PV installed on all NLC new builds.
• Fabric first approach on all NLC new build properties which includes  
enhanced insulation, window and doors standard.
2.6.8 Auchinlea Landfill Site. Following a review of Auchinlea Landfill Site a two-
phase project (surface water management and leachate management) which
commenced June 2024. Committee will note that the latter (leachate
management) refers to water, such as rainfall, which has passed through the
solid matter. In this case the solid matter is landfill.  Therefore both aspects of
the project were crucial to the environmental management of the site.  Phase 1
Page 48 of 102

Page 49

has seen the installation of a passive surface water drainage system that has
eliminated the need of costly diesel pumps.  The Council will save over £60,000
per annum as a result of this.  The second phase of the project is looking to
treat the leachate onsite by creating a lagoon filtration system. Discussions are
currently ongoing with SEPA. Should the project attain the necessary approvals,
it will:
• Enhance the biodiversity of the site
• Realise an annual saving of £85,000
• Eliminate the transporting of leachate, off site, for treatment.
2.6.9 The Council continues to invest in our existing housing stock to ensure that
we not only increase the energy efficiency of the properties but reduce carbon
emissions and contribute towards meeting national net zero targets. Overall,
6,000 energy efficiency measures installed in our homes in 2023/24, with 462
properties having External Wall Insulation installed, 600 properties having their
windows upgraded to Triple-Glazed Windows, 2,300 homes receiving Energy-
efficient Heating, 1,900 homes had Solar Panels installed and 689 received
Insulation Upgrades. As part of these works, we received funding from the
Scottish Government’s Energy Efficient Scotland: Area Based Scheme, to
install external wall insulation to flatted blocks in Kilsyth and Langloan. The
amount invested in these areas is £3.4m, with £1m being funded by the Scottish
Government to assist homeowners with the cost of the works.
2.6.10 Town and Community Hubs. Riverbank Community Hub opened in August
2023 and is a state of the arts facilities with multi-use flexible teaching areas
and an 11-a side outdoor pitch. The Hub is a resource that serves the local
community.
Adaptation Plan
2.7 The Council has a duty to act in a way that supports the successful delivery of the
Scottish National Adaptation Plan 2024-2029. The Council is already taking action to
enable North Lanarkshire to become more resilient to climate change. This is known as
adaptation. North Lanarkshire has already experienced some of the impacts of climate
change:
• Disruption to transport
• Heavy rainfall contributing to surface water flooding
• Increased risk of disruption to drainage systems
• Increase in severe weather events: heat and cold. 
Table 4 Projected Changes in Climate within North Lanarkshire
Page 49 of 102

Page 50

Source 1 Climate Report for North Lanarkshire (Met Office, 2024)
2.7.1 Some of the change to the climate is already locked in i.e. it is not likely to
improve and so in the future we are likely to see warmer, wetter winters and
hotter, drier summers with also an increase in intense rainfall events. The
information in Table 4 illustrates projections based on a selection of global
warming scenarios. 
2.7.2 Table 5 provides an example of adaptation action carried out within the council,
specifically by the Water Management Team: 
Table 5 Extract from Public Sector Climate Change Duties Report
Flood Risk Management (FRM) 
• Water Management are developing a maintenance and inspection schedule for
watercourses/culverts/debris screens. The proactive management of these assets would
reduce flood risk and the impact of flooding by reducing the likelihood of blockages and
failure of infrastructure. 
• Finalised a Strategic Flood Risk Assessment for the local authority area, which ranks
Council areas in terms of flood risk to property. This document will allow the Council to
prioritise actions to those areas at greatest flood risk.
• Progression to outline design for the Kilsyth Flood Risk Reduction Scheme. The scheme
proposes to protect 87 properties from flooding in a 1 in 100-year event from flooding from
the Ebroch Burn and Garrel Burn. The Scheme is scheduled to be constructed by spring
2026.
• Finalised the following actions from the Clyde and Loch Lomond Local Flood Risk
Management Plan:
o Phase 2 - Motherwell Surface Water Management Plan
o Phase 2 - Cumbernauld Surface Water Management Plan
• We are progressing the following actions, which are due for delivery before 2028:
o Phase 2 - Kilsyth Surface Water Management Plan
o Detailed Design of Kilsyth Flood Risk Reduction Scheme
o Phase 2 - Airdrie Surface Water Management Plan
o Airdrie - Floody Study and Optioneering
o Bellshill - Flood Study and Optioneering
• Flood studies and surface water management plans identify potential options that could
be implemented to manage future flood risk within the study area. The intention is to
further refine the options to those areas at greatest flood risk and deliver schemes to
reduce the flood risk and impact, subject to budget and resource availability.  
Page 50 of 102

Page 51

2.7.2 The Net Zero Pathway will incorporate adaptation as of one its key themes and
will be supported by direct and facilitating action. It will align with outcomes set
within the national plan:
• Nature Connects
• Communities
• Public Services and Infrastructure
• Economy, Business and Industry
• International Action 
Conclusions and Recommendations
2.8 The Council’s progress towards net zero emissions has slowed and requires a level of
action that reflects the climate and biodiversity emergency that is faced. The Net Zero
Pathway is in development and in its action planning, will look to determine solutions
that will enable the Council to meet its climate change duties. Its success will be reliant
on the Council’s commitment to resource these actions. 
2.8.1 The Council has continued to deliver climate action and has realised good
outcomes that goes beyond emission reductions such as helping those in fuel
poverty and improving wider poverty outcomes as well as improving the physical
and wellbeing of residents. Opportunities to collaborate with partners and co-
produce with our communities should be fully explored as the Net Zero Pathway
moves forward.
2.8.2 Adapting to a changing climate is an essential consideration for the Council and
in order to meet its duties it must formalise our actions within the Net Zero Plan.
Good work is already undertaken but our new net zero pathway will critically
review the way forward. 
3. Measures of success
3.1 Reduction in Emissions per Staff (tCO2e) 
3.2 Reduction in Emissions per Capita (tCO2e)
3.3 Reduction in Emissions per km2 (tCO2e) 
4. Supporting documentation  
Appendix 1  Organisational Targets
Appendix 2 Breakdown of Emissions (2023/24)
Appendix 3 Contents Page of Local Authorities Climate Change Plan Template
(Draft, 2024) 
James McKinstry
Chief Officer (Assets & Procurement) 
Page 51 of 102

Page 52

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Fulfilling the Council’s Climate Change Duties will require significant investment.
Meaningful retrofit, ensuring the Council will meet the 2038 Heat in Buildings
target, will require all buildings within the Council’s portfolio to undergo an intensive
fabric first (insulation, roofs, windows etc) approach, supported by replacement of
existing heating systems where natural gas is currently used. Climate change
impacts on buildings, our road infrastructure and other systems that we deem
essential to go about our daily lives. The cost of adapting these assets to the short
and medium term risks faced is yet to be determined but it is acknowledged that
this along with mitigation (deep retrofit) will require a significant resource which will
exceed what is currently available to the council.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Page 52 of 102

Page 53

Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The performance reviewed within this report shows that emissions have continued
to decline but as reported are slowing down. The commitment to producing a new
climate plan (Net Zero Pathway) will critically review the way forward. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Climate change is on the corporate risk register and there are controls/actions in
place to mitigate different aspects of the risk. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
Page 53 of 102

Page 54

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any Council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒
Page 54 of 102

Page 55

Appendix 1 - Organisational targets1 
Name of target Boundary/scope
of target
Year used
as
baseline
Baseline
figure
(tCO2e)
Target
completion
year
Progress
against
target
Comments
Climate Emergency Target Net Zero
(as amended May 2020) - All
emissions
All emissions  2015/16  117,075                 2030/31 60,352  
48.5% reduction from baseline excluding new
additions to reporting year footprint. Target
date 2030
Annual Emissions Reduction Target
(from baseline) All emissions  2015/16  117,075                 2023/24 60,352 
48.5% reduction from baseline excluding new
additions to reporting year footprint. Target
date 2030
Annual Emissions Reduction Target:
Buildings
Energy use in
buildings  2015/16  74,509               2023/24 40,686   45% reduction from baseline
Annual Emissions Reduction Target:
Transport Transport  2015/16  6,806  2023/24 6,147  10% reduction from baseline.
Annual Emissions Reduction Target:
Waste Waste  2015/16  35,760  2023/24 13,436  42% reduction from baseline 
1 Section 3d Public Bodies Climate Change Duties Compliance Report
Page 55 of 102

Page 56

Appendix 2 – Breakdown of emissions (2023/24)2
Emission source Scope Emissions (tCO2e) Trend
Average car – Unknown (Commuting) Scope 3 1,731.6 New to
Carbon
Boundary
Average local bus (Commuting) Scope 3 33.7
National rail (Commuting) Scope 3 7.0
Transmission and distribution - Electricity: UK Scope 3 1,365.8 
Electricity: UK Scope 2 15,786.6 
Natural gas Scope 1 22,672.1 
Water supply Scope 3 72.1 
Water treatment Scope 3 130.1 
Burning oil (Kerosene) Scope 1 44.6 
Wood chips Scope 1 35.2 
Gas oil Scope 1 304.3 
Household/Municipal/Domestic waste - Landfill Scope 3 10,530.9 
Commercial and industrial waste - Landfill Scope 3 970.9 
Organic: food and drink waste - Composting Scope 3 4.1 
Organic: mixed food and garden waste - Composting Scope 3 193.9 
Organic: garden waste - Composting Scope 3 6.1 
Paper and board: board - Composting Scope 3 73.4 
WEEE - mixed - Combustion Scope 3 26.8 
Glass - Recycled Scope 3 139.8 
Metal: mixed cans - Recycled Scope 3 171.1 
Household/Municipal/Domestic waste/Industrial - Combustion Scope 3 776.8 
Petrol (average biofuel blend) Scope 1 353.3 
Diesel (average biofuel blend) Scope 1 4,801.0 
Landfill gas Scope 1 0.1 
Average car - Diesel Scope 3 367.9 
Average car - Petrol Scope 3 603.8 
Average car - Unknown Scope 3 21.0 
Homeworking (office equipment + heating) Scope 3 358.7 
Mixed dry recyclates - Recycled Scope 3 541.9 -
HFC-32 Scope 1 0
New to
Carbon
Boundary
R407C Scope 1 0
R410A Scope 1 0
R22 Scope 1 0  
62,124.5 tCO2e 
2 Section 3b Public Bodies Climate Change Duties Compliance Report
Page 56 of 102

Page 57

Appendix 3 Contents Page of Local Authorities Climate Change Plan Template (Draft,
2024) 
Page 57 of 102

Page 58

Page 58 of 102

Page 59

North Lanarkshire Council
Report
Environment & Climate Change Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    MF/PB Date 05/02/25 
Review of Strategy for the Inspection of Contaminated Land 2025-
2030 
From  Lyall Rennie, Chief Officer (Community Operations)  
E-mail RennieLy@northlan.gov.uk  Telephone 07855 193500 
Executive Summary 
Following approval of the Council’s Environment Pathway document (which replaced the
Council’s Environment Strategy) at this committee on 3 May 2023 Document.ashx, this
report presents elected members with the latest review of the Council’s Contaminated Land
Strategy undertaken by Environmental Health’s Pollution Control service, including an
update on the progress to date and the strategic priorities, aims, objectives and review
timelines for the strategy. 
Recommendations
It is recommended that the Environment & Climate Change Committee: 
(1) Acknowledge the contents of the report; and
(2) Endorse and approve this strategy for the inspection of contaminated land.  
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (3) Maximise the use of our marketable land and assets through
improved development in business and industrial infrastructure
Ambition statement
(16) Transform our natural environment to support wellbeing and
inward investment and enhance it for current and future
generations
Ambition statement (17) Ensure we keep our environment clean, safe, and attractive
Programme of Work Statutory / corporate / service requirement
Item 5
Page 59 of 102

Page 60

1. Background 
1.1 The vision for North Lanarkshire to be a place of inclusive growth and prosperity for all
was founded on the evidence presented in the report ‘A Shared Ambition for North
Lanarkshire’ in September 2018. This report set out the operating framework required
for the Council to enhance the alignment of, and synergies between, strategic and
operational functions to successfully deliver on the vision which was thereafter
formalised through approval of ‘The Plan for North Lanarkshire’ and associated local
development plans Current North Lanarkshire Local Development Plan | North
Lanarkshire Council.  The contaminated land strategy supports these Council aims and
objectives in developing the area sustainably for the benefit of our communities. 
1.2 The implementation of the Council’s Environment Pathway document followed a review
and assessment of the Environment Strategy. The Pathway is aligned to the Shared
Ambition and Plan for North Lanarkshire documents as it brings together separate but
related strategies, policies and plans to ensure a one Council approach to the
environment and that we continue a route of inclusive growth, including the inspection
strategy for contaminated land. Significant resources are deployed in the management,
maintenance and construction of our environment and it is essential that these are
deployed to deliver the best possible outcomes for North Lanarkshire’s communities. 
1.3 It is essential that the Council recognises the importance that the environment plays in
the day-to-day life of people who live, work and visit North Lanarkshire. A key part of
the overall Environment Pathway document is the Council’s Contaminated Land
Strategy which details how the Council will fulfil its’ statutory duties, protect human
health and the environment whilst at the same time assisting with economic
regeneration. 
2. Report 
2.1 Part IIA of the Environmental Protection Act 1990 imposes duties upon local
authorities relevant to contaminated land. These include:
• To inspect their areas to identify any contaminated land; 
• To determine whether individual sites meet the statutory definition of contaminated
land; 
• To ensure that appropriate action is taken for the remediation of the land; and 
• To keep a public register of the sites designated as contaminated land and
actions taken to remediate. 
2.2 The Council published its first strategic document outlining our approach to fulfilling the
statutory duties placed upon us in respect of contaminated land in August 2001. The
original inspection strategy document has been updated several times in subsequent
years, and the inspection strategy enclosed as Appendix 1 is the latest strategy review,
noting the development of our policy and how we intend to take matters forward.  We
aim to prioritise sites of most concern, take proportionate actions based upon an
assessment of the actual or potential risk/s posed by sites, and ensure that resources
are effectively directed toward the sites where we believe we are most likely to
encounter contaminated land. 
2.3 Aligned to the Plan for North Lanarkshire’s Programme of Work, the inspection strategy
is part of the larger regeneration toolkit employed by the Council. We will continue to
work closely with Planning and Building Standards colleagues to ensure a rigorous
review of new development applications provides us with an increase in the standard
of remediation associated with land development in North Lanarkshire. 
Page 60 of 102

Page 61

2.4 This inspection strategy document recognises and reflects the overall strategic
direction of the Council, taking account of the Programme of Work and the ‘One
Service’ ethos, to ensure that services are delivered in a streamlined, efficient and
collegiate fashion, maintaining the overall vision of inclusive growth and prosperity for
all.  The strategy aims to assist in the delivery of the Programme of Work to 2028 and
beyond in relation to:
• Providing appropriate land supplies to meet expected demands;
• Safeguarding and improving environmental assets; and
• Seeking to minimise environmental impact. 
2.5 This Council is one of only 5 local authorities in Scotland which receives funding in
respect of the extent of vacant and derelict land (VDL) within the area and associated
levels of deprivation (the other authorities being Glasgow, South Lanarkshire, North
Ayrshire and Fife. The latest VDL site register from 2023 noted that the Council had
462 sites with a total area of 1,292 Hectares within North Lanarkshire classified as
vacant and derelict. VDL related funding for 2024-2025 was set at £1.231 million to
support us in implementing the objectives of the VDL fund to:
• tackle long term vacant and derelict land; 
• stimulate economic growth and job creation;
• develop a diverse sustainable environment with a focus on temporary and
permanent greening; and
• support communities to flourish and tackle inequalities. 
2.6 North Lanarkshire has a historic legacy of large scale heavy industry and as a
consequence we focus on the areas of potential historical contamination that require
attention as we pursue the development plans for the Council. Since the
implementation of the strategy, a number of previously identified contaminated land
sites have been partly or completely remediated; this process has increased in
importance as we continue to regenerate the area in line with agreed strategic goals. 
2.7 Allied to the remediation of land, preventing deterioration of the water environment,
including drinking water resource, is a key purpose of the strategy.  We want to improve
the condition of water bodies and protected areas that are not in a ‘good’ or ‘moderate’
condition, as defined by the SEPA River Classification 
https://informatics.sepa.org.uk/WaterClassificationHub/. 
2.8 The Council’s priorities when dealing with contaminated land are to:
• Protect –
 Human health
 The water environment
 Designated ecosystems
• Prevent –
 Damage to property
 Further contamination of land
• Encourage –
 Voluntary remediation
 Re-use of brownfield sites
• Stimulate – 
 Economic growth 
2.9 To help us deliver on these priorities, the objectives of the strategy include:
• To inspect our area from time to time to identify contaminated land;
• To determine whether a particular site meets the definitions of contaminated land
as defined under Part IIA;
Page 61 of 102

Page 62

• To establish responsibility and liability for remediation of contaminated land;
• To ensure that appropriate remediation of contaminated land takes place; 
• To keep a public register detailing regulatory action as defined under Part IIA;
• To assist in the delivery of the Plan for North Lanarkshire by improving the health
and care of our communities and encouraging economic growth and development;
• To recognise and incorporate recent legislative changes;
• To update the CL strategy by providing greater detail of the approach being taken
by North Lanarkshire when investigating potentially contaminated land sites based
on past experiences; and
• To inform neighbouring authorities, partner organisations, statutory and non-
statutory consultees of North Lanarkshire Council the aims and objectives of the
strategy. 
2.10 The Council is obliged to maintain a public register containing the details of
contaminated land sites as prescribed by Regulation.  This register is maintained and
available for inspection upon request from the Pollution Control team within Protective
Services. 
2.11 It is our intention to review the strategy every 5 years unless a change in legislation or
other external factor necessitates an earlier review. 
3. Measures of success 
3.1 Paragraphs 2.8 and 2.9 relate, as will the Council’s ongoing plans which this strategy
will assist with ensuring that North Lanarkshire is the place to live, learn, work, invest
and visit. 
4. Supporting documentation 
4.1 Appendix 1 - Review of Strategy for the Inspection of Contaminated Land 2025-2030. 
Lyall Rennie
Chief Officer (Community Operations) 
Page 62 of 102

Page 63

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Page 63 of 102

Page 64

Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles
from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 64 of 102

Page 65

Appendix 1   
NORTH LANARKSHIRE COUNCIL
STRATEGY FOR THE 
INSPECTION OF CONTAMINATED LAND 2025 – 2030 
Page 65 of 102

Page 66

Version control
Author Mark Findlay Contact findlaym@northlan.gov.uk 
Owner Lyall Rennie Contact  Renniel@northlan.gov.uk 
Date 20th December 2024 Version 1.0 Document Status Final 
Governance Committee Environmental and Climate Change 
Date Approved  February 2025 Review Date February 2030
Strategic Alignment 
Consultation and Distribution Record
Consultation process Stakeholder meetings and liaison as described in clause 11.1
Stakeholders SEPA, Internal Council Services, NHS Lanarkshire, Scottish
Government
Distribution  Publication on NLC website and document sent to partners   
Change Record
Date  Insert Date  Author Insert Name 
Change made   
Page 66 of 102

Page 67

CONTENTS 
Chapter 1: Introduction 4
Chapter 2: Strategic Priorities 5
2.1 North Lanarkshire Council Policy 6
2.2 The Plan for North Lanarkshire 6
2.3 Local Plan Policy Document 6
2.4 Regeneration 7
2.5 Environment Pathway 7
2.6 The Scottish Vacant and Derelict land Survey and the Vacant and Derelict Land
Fund
8
Chapter 3: Regulatory Context Applicable to North Lanarkshire 9
3.1 Role of Local Authority 10
3.2 Definition of Contaminated Land under Part IIA 10
3.3 Pollution Linkage 11
3.4 Significant Pollution Linkage 12
3.5 Suitable for Use 12
Chapter 4: Characteristics of the North Lanarkshire Area 12
4.1 Geographical Location 12
4.2 Size 13
4.3 Current Land Use Characteristics 13
4.4 Historical Information on Contamination 13
4.5 Updated Information on Contamination 14
4.6 Key Water Resources/Protection Issues 14
Chapter 5: Overall Aims, Objectives and Timescales 15
5.1 Aims of the Inspection Strategy 15
5.2 Objectives of the Contaminated Land Strategy 16
5.3 Priorities 17
Chapter 6: Procedures  18
6.1 Geo-Environs Site Prioritisation Module 18
Chapter 7: Remediation 20
Chapter 8: Information Management 21
Chapter 9: Public Registers 21
Chapter 10: Complaints and Requests for Information 21
Chapter 11: Liaison and Communication 22
11.1 Liaison with Consultees and Statutory Consultees - Table 1: List of Consultees 22
Chapter 12: Review Mechanisms 23
Chapter 13: Progress to Date and Timescales 23
13.1 Progress to Date - Table 2: Year on Year Progress 23
13.2 Future Tasks & Timescales - Table 3: Detailed Objectives, Actions & Proposed     
Timescales 
24 
Page 67 of 102

Page 68

Chapter 1: Introduction
A new statutory regime came into force in July 2000 when the Environmental Act 1995 modified
the Environmental Protection Act 1990 with regards to the regulatory powers available to Local
Authorities for dealing with contaminated land. These provisions are commonly referred to as
Part IIA. To supplement and enforce these provisions, Scottish Ministers also introduced the
Contaminated Land (Scotland) Regulations 2005 and the Radioactive Contaminated Land
(Scotland) Regulations 2007.
The duties imposed on Local Authorities are:
To inspect their areas from time to time to identify any contaminated land 
To determine whether a particular site meets the statutory definition of contaminated land 
To establish responsibilities for remediation of the land 
To ensure that appropriate remediation takes place:
• Through agreement with those responsible, or
• By serving a remediation notice on the appropriate person(s)
• In certain cases, carrying out these works themselves
• In certain cases, through the use of other powers 
To keep a public register detailing those sites designated as contaminated land and actions
taken thereby. 
In August 2001, North Lanarkshire Council published a strategic document outlining the
authority’s approach to using these powers entitled, “The Inspection Strategy for the
Identification of Contaminated Land” and supplemented this with various updates with the last
update being in 2019. This document provides the latest review of the information, updated
strategy and outlines the way in which North Lanarkshire Council intends to use the powers
under Part IIA to progress its inspection strategy.  North Lanarkshire Council intends to
continue to inspect its area using a strategic approach, which will:
Be rational, ordered and efficient 
Be proportionate to the seriousness of the actual or potential risk 
Seek to ensure that the most pressing and serious problems are located first 
Ensure that resources are concentrated on investigating areas where the authority is most
likely to find contaminated land; and 
Ensure that the authority efficiently identifies requirements for the detailed inspection of
particular areas of land 
Land contamination can be a potential constraint on development. This strategy recognises
the pivotal role played by the planning and development cycle in regenerating previous
industrial sites, particularly where, as is the case for North Lanarkshire, the desire is to improve
Page 68 of 102

Page 69

the long term economic and social development of the area. The urbanised nature of much of
North Lanarkshire with many sites identified as potentially contaminated in the initial stages of
the regime have been subject to redevelopment and subsequent work under Planning Advice
Note 33 (Plan 33).  As such this strategy seeks, whenever possible, to work within this broad
policy framework. The strategy aims to be part of a larger regeneration toolkit available to North
Lanarkshire and where possible combines the aims to deliver sites that are suitable for use
and for further development, encouraging long-term economic and social benefit to the local
population and communities. 
To improve understanding of Part IIA, the Pollution Control Team have worked hard to
establish effective communications with various services including but not limited to Planning,
Building Standards, Education, Estate Development, Housing Development, City Deal and
Greenspace.  Regular communication with colleagues from these service areas takes place to
ensure common goals around the Programme of Work are aligned. This in turn raises the
standard and scope of the supporting information submitted with planning applications where
land is contaminated and will require site investigations and remediation.  Robust peer review
of applications has achieved increased standards of remediation associated with land
development and consistency around our approach to this work has helped reduce the amount
of potentially contaminated land sites in North Lanarkshire since the introduction of the regime. 
North Lanarkshire remains committed to seeking voluntary remediation as the preferred
approach and thereby avoiding the need to serve formal notices under Part IIA.   This approach
is considered the most effective approach in the majority of situations for providing land
“suitable for use” that can be used to the long-term benefit of the residents and businesses
within North Lanarkshire.
The authority also recognises the potential risk to the water environment posed by
contaminated land and development work on such land. North Lanarkshire remains committed
to working with the Scottish Environment Protection Agency (SEPA) on policy and regulatory
practice as part of their responsibilities arising from the implementation of the Water
Framework Directive (WFD). At the time of writing this strategy we envisage that there will be
some legislative and regulatory change concerning the water environment and the council will
monitor any changes to ensure it takes account of these. 
It is North Lanarkshire Council’s intention that the reviewed Inspection Strategy for the
Identification of Contaminated Land will continue to form the basis for implementation of the
Part IIA legislative requirements. The Strategy will provide not only the arrangements and
procedures for inspection of land within North Lanarkshire but also a justification for, and a
transparency in the decisions on how the land will be inspected. It is considered that any
reprioritisation would take into consideration the responsibilities that would be required under
the WFD to consider any potential risk to the water environment - in particular, where the water
body status is at risk of deterioration.  
Page 69 of 102

Page 70

Chapter 2: Strategic Priorities
The Contaminated Land Strategy is an important element in the overall strategic direction of
the Council and integrates fully with the Council’s key strategic documents. 
2.1  North Lanarkshire Council Policy
The Contaminated Land Strategy will be an essential part in delivering key elements of The
Plan for North Lanarkshire and the Programme of Work which will regenerate land and provide
facilities for communities over the coming years to ensure that North Lanarkshire is the place
to live, learn, work invest and visit.
The priorities of the Plan to deliver the shared ambition of inclusive growth and prosperity,
mean that our work will be focused to:
1. Improve economic opportunities and outcomes
2. Support all children and young people to realise their full potential
3. Improve the health and wellbeing of our communities
4. Enhance participation, capacity, and empowerment across our communities
5. Improve North Lanarkshire’s resource base 
2.2  The Plan for North Lanarkshire
The Plan for North Lanarkshire sets the direction for the Council and partners. Its purpose is
to communicate the shared priorities and provide a focus for activities and resources.
The Plan for North Lanarkshire is a high-level strategic document that outlines a long-term
vision for North Lanarkshire - a vision where North Lanarkshire is the place to Live, Learn,
Work, Invest, and Visit.
The Plan for North Lanarkshire | North Lanarkshire Council 
2.3  Local Development Plan 
Planning colleagues are preparing the next Local Development Plan – North Lanarkshire Local
Development Plan 2 (NLLDP2).
The LDP is an important document that sets out the policies and proposals for land use and
development in North Lanarkshire.  It will set out the future for development, for example,
where new housing, business, and infrastructure will be located.  The timeline for its
preparation is set out in the Development Plan Scheme and Participation Statement, with the
adoption of NLLDP2 expected in 2027.
Page 70 of 102

Page 71

Further details in relation to the current local development plan and the development of the
new plan along with local place plans can be found at Development plans | North Lanarkshire
Council 
2.4  Regeneration
North Lanarkshire Council’s refreshed Economic Regeneration Delivery Plan (ERDP) was
published in 2023 and can be found here: Economic Regeneration Delivery Plan | North
Lanarkshire Council
The North Lanarkshire ERDP sets out a high-level framework for improving economic
opportunities and outcomes for all. The 2023-28 ERDP aims to do this by directing capital
investment towards four key goals: 
• developing housing that promotes improved quality of life and creates a better place to
live.
• reshaping our town centres to ensure that these provide modern and attractive centres
that meet the needs of our communities.
• improving our business and industrial infrastructure, creating opportunities for
investment and for companies to start-up and relocate here; and
• continuing to improve our connectivity and develop new opportunities by transforming
our road, rail and digital infrastructure.
The ERDP encompasses new housing development, infrastructure development, town centre
regeneration and business growth, and will build on the wide range of emerging economic and
physical regeneration activity that is already underway in North Lanarkshire. This will include:
• Creating viable and sustainable town centres, increasing delivery of new housing
supply across tenures, particularly within town centres and on brownfield sites, to meet
the housing needs within NL;
• Improving our business and industrial infrastructure, creating opportunities for
investment which include continuing to support enabling investment to bring vacant and
derelict land and brownfield sites into commercial use within NL;  
• Improving economic outcomes for local people, and in particular those who are
disadvantaged; and 
• the Plan for Growth identifies the main priorities for growing the North Lanarkshire
economy over the next five years and how this will be achieved. 
This strategy complements and reinforces the approach outlined in the ERDP Plan for North
Lanarkshire and within the contaminated land strategy there is a focus on what Pollution
Control can do to assist in the development of the local economy by helping bring the most
appropriate sites back into suitable use. 
Page 71 of 102

Page 72

2.5  Environment Pathway
Environment Pathway | North Lanarkshire Council
The purpose of the Environment Pathway for the Council, which was implemented following a
review and assessment of the Environment Strategy, is to align and connect separate but
related strategies, policies and plans to ensure a one Council approach to the environment
that ensures we continue with a route to inclusive growth by bringing these policies together.
Significant resources are deployed in the management, maintenance and construction of our
environment and it is essential that these are deployed to deliver the best possible outcomes
for North Lanarkshire’s communities. It is essential that the Council recognises the importance
that the environment plays in the day-to-day life of people who reside, work in and visit North
Lanarkshire. 
This includes everything from the air we breathe to how we travel throughout the area, and
how we maximise the use of our green and open spaces. The importance of this has recently
been recognised in the Council’s declaration of a Climate Emergency and the setting of a
challenging net-zero target for 2030 with the importance of high quality, local environments
being highlighted during the recent pandemic.  The Contaminated Land Strategy forms a key
part of this overall Environment Pathway document and is aligned with the strategic priorities
which aim for the Council to deliver on environmental improvements for communities.   
2.6 The Scottish Vacant and Derelict Land Survey (SVDLS) and the Vacant and
Derelict Land Fund (VDLF)
The SVDLS is a survey undertaken to establish the extent and state of vacant and derelict land
in Scotland. The survey has been operating since 1988 and is managed by the Scottish
Government Communities Analytical Services.  Most Councils submit data annually at the end
of the financial year. The data collected provides an invaluable source of information relating
to vacant and derelict sites and assists in reinforcing and justifying national policy established
to bring about the re-use and regeneration of these land resources. The site register for 2023
indicates that there are 462 sites with a total area of 1,292 Hectares within NL classified as
vacant and derelict.  A copy of the most up to date Vacant and Derelict Land Register can be
found here: 
Scottish Vacant and Derelict Land Survey - site register - gov.scot (www.gov.scot) 
The VDLF is an element of the local government budget settlement as agreed by the Scottish
Government.  It focuses on projects that promote innovation in both temporary and longer-
term greening techniques for vacant and derelict land sites. The fund is open to all 32 Scottish
local authorities individually, or whether they exercise their functions through urban
regeneration companies (URCs) or other special purpose vehicles (SPVs).  Only 5 local
authorities currently obtain funding, and North Lanarkshire is one of them.  The NL share of
funding for 2024/25 was £1.231million, reflecting the extent of vacant and derelict land in the
authority linked with associated levels of deprivation.  Currently, 69% of the population in North
Lanarkshire live within 500m of a derelict site. The other four authorities that receive funding
are Glasgow, South Lanarkshire, North Ayrshire and Fife.
Page 72 of 102

Page 73

Scottish Vacant and Derelict Land Survey 2023 - gov.scot (www.gov.scot)
https://www.gov.scot/policies/regeneration/capital-investment/
The key objectives of the VDLF are to:
1. Tackle Long Term Vacant and Derelict Land (VDL)
2. Stimulate economic growth and job creation
3. Develop a diverse sustainable environment with a focus on temporary and permanent 
greening
4. Support communities to flourish and tackle inequalities
Bringing abandoned and unloved urban places back into productive use can help to tackle
climate change, improve health and wellbeing, create more resilient communities and rebuild
the NL economy in a way that helps everyone achieve their full potential.  In 2018, the Scottish
Land Commission and SEPA jointly established a national taskforce to help realise this
opportunity. The Vacant and Derelict Land Taskforce brought together senior representatives
from around 30 businesses, public bodies and third sector organisations who have spent two
years working to transform the existing approach to bringing vacant and derelict land back into
productive use. The Taskforce has made a series of recommendations to the Scottish
Government to transform Scotland’s approach to tackling the legacy of derelict land and
ensure that it is no longer acceptable to allow land to fall into long term disrepair and they can
be found here:
Vacant and Derelict Land Taskforce - Housing & Development - Our work - Scottish Land
Commission
Working with SEPA and the Green Action Trust, the Scottish Land Commission have
published a map of long-term, derelict urban sites (DUSTEs), which includes ownership details
for each site. Landowners, including local authorities, are being asked to make a public
commitment to taking proactive steps to address the vacant and derelict sites identified.  
Transforming Vacant and Derelict Land - Housing & Development - Our work - Scottish Land
Commission
The above linked report highlights the various funding landscapes and updates the current
thinking around progressing with the reuse of existing VDL sites and preventing future sites
from becoming VDLs. North Lanarkshire is attempting to source funding from a variety of
different streams and will take cognisance of the recommendations outlined in the report.
Vacant and Derelict Land Reuse: Progress Report 2024 (landcommission.gov.scot) 
Chapter 3: Regulatory Context Applicable to North Lanarkshire 
The contaminated land provisions of Part IIA of the Environmental Protection Act 1990 came
into force in Scotland on 14 July 2000. The Scottish Ministers made the Environment Act 1995
(Commencement No.17 and Saving Provision)(Scotland) Order 2000 (SSI.2000/180) bringing
into force Part IIA of  the Environmental Protection Act 1990.  Part IIA was inserted into the
1990 Act by Section 57 of the Environment Act 1995.
Page 73 of 102

Page 74

The Scottish Ministers, in exercise of the powers conferred upon them by sections 78C (8)
to(10), 78E (6), 78G (5) and (6), 78L (4) and (5) and 78R (1), (2) and (8) of the Environmental
Protection Act 1990 and of all other powers enabling them made the Contaminated Land
(Scotland) Regulations 2000 (S.I.2000/178), and SERAD Circular 1/2000 Statutory Guidance
on Contaminated Land. Subsequently, and as a result of the Contaminated Land (Scotland)
Regulations 2005 (SSI 2005/658) (the Scottish Regulations) made by the Scottish Ministers
under powers conferred by section 20 of, and schedule 2 to, the Water Environment and Water
Services (Scotland) Act 2003. Circular SERAD 1/2000 has been replaced by the statutory
guidance as set out in Annex 3 to the Environmental Protection Act 1990: Part IIA
Contaminated Land Statutory Guidance: Edition 2, May 2006.  
Radioactive Contaminated Land (Scotland) Regulations 2007 (as amended) were brought into
force for the investigation, identification, characterisation and regulation of radioactive
contaminated land for which SEPA would take the lead role.
The Regulatory Reform (Scotland) Act 2014 amends the Environmental Protection Act 1990,
giving SEPA the choice to end the designation of a special site that no longer meets the
requirements of being so designated. In these circumstances, the local authority resumes the
responsibility as the lead regulator. The development of this strategy review is in response to
the requirements of Part IIA, which  requires local authorities to keep up to date their formally
adopted and published Contaminated Land strategy document outlining their approach to their
duties.
3.1 Role of Local Authority 
Under the provisions, duties have been assigned to both Local Authorities and SEPA. The
primary regulatory role for the Contaminated Land Regime rests with the Local Authority. The
role is designed to reflect the Authority’s existing functions under the statutory nuisance
regime, and also complement their responsibility as planning authorities.
The main role of the Local Authorities under this regime is to complete a ‘Contaminated Land
Inspection Strategy’ and:
• To cause their areas to be inspected from time to time to identify any contaminated
land
• To determine whether a particular site meets the statutory definition of contaminated
land
• Establish responsibilities for remediation of the land
• Ensure that appropriate remediation takes place through agreement with those
responsible preferably through planning development, or if not possible
• By serving a remediation notice, or
• In certain cases, the authority decides to carry out the work, or
• In rare circumstances, through our powers
Page 74 of 102

Page 75

• Keep a public register detailing any regulatory action taken under the CL regime 
3.2 Definition of Contaminated Land under Part IIA
Section 78A(2) of the Environmental Protection Act 1990 gives the statutory definition of
contaminated land for the purposes of Part IIA as:
“Any land which appears to the local authority in whose area it is situated to be in such a
condition, by reason of substances in, on or under the land, that- 
a) significant harm is being caused or there is a significant possibility of such harm is 
being caused; or 
b) significant pollution of the water environment is being caused or there is a 
significant possibility of such pollution being caused”.
The definition is intended to reflect the anticipated role of Part IIA, thus enabling the
identification and remediation of land on which contamination is causing unacceptable risk to
human health or the wider environment. The definition does not necessarily include all land
where contamination is present, even though the contamination may be relevant in the context
of other legislation.
Section 78A(5) requires the regulatory authority to act in accordance with guidance contained
within Scottish Executive Circular 1/2000 in determining significance and likelihood, now
replaced by the Contaminated Land (Scotland) Regulations 2005 (SSI 2005/658) (the 2005
Regulations). 
3.3 Pollution Linkage
Before any Local Authority can make a judgment that any land appears to be contaminated
land, the Authority must first identify a pollution linkage which is now well established. This
means that each of the following has to be identified:
• A contaminant
• A pathway
• A relevant receptor
A contaminant is defined as:
“a substance which is in, on or under the land and which has the potential to cause harm or to
cause pollution to the water environment”.
A receptor is defined as:
(a) “a living organism, a group of living organisms, an ecological system or a piece of property
which 
1. Is in a category listed in Table A, in Chapter A of the Scottish Government, 
Environmental Protection Act 1990, Part IIA Contaminated Land Statutory Guidance: 
Edition 2 May 2006 Paper SE/2006/44 as a type of receptor, and  
Page 75 of 102

Page 76

2. Is being, or could be, harmed by a contaminant, or 
(b) "the water environment is being, or could be, polluted by a contaminant”.
A pathway is defined as: 
One or more routes or means by, or through, which a receptor 
(a) “is being exposed to, or affected by, a contaminant, or  
(b) could be so exposed or affected”.  
This approach recognises that harm to health and the environment arises not from the mere
presence of contaminating substances in land, but from their movement along a pathway to
where they can cause harm to a receptor. Unless all three elements of a pollutant linkage are
identified in respect to any piece of land, that land should not be identified as contaminated
land. It is also possible that there may be more than one pollution linkage on any given piece
of land. 
3.4 Significant Pollution Linkage
In order to define an area of land as being contaminated under the legislation, a Local Authority
must further satisfy itself that such a pollutant linkage exists in respect of the piece of land, and
that pollutant linkage: 
• is resulting in significant harm being caused to the receptor in the pollution linkage
• presents a significant possibility of significant harm being caused to that receptor
• is resulting in significant pollution of the water environment or there is a significant
possibility of such pollution being caused; and/or
• is likely to result in such pollution.
Descriptions of significant harm and conditions for there being a significant possibility of
significant harm are listed in Tables A and B respectively of the Scottish Government
Environmental Protection Act 1990: Part IIA Contaminated Land Statutory Guidance: Edition
2 May 2006 Paper SE/2006/44.  Consideration must also be given to the timescale within
which the harm might occur (e.g. if the current use of the land is due to change) and the
vulnerability of the receptors. 
3.5 Suitable for Use
The Regulations are aimed at identification and dealing with significant contamination in
Scotland, and only specify a ‘suitable for current use’ approach.  The suitable for current use
approach recognises that the risks presented by contamination will vary dependent upon the
use of the land and other wider natural and built factors. The suitable for use approach consists
of three elements:
• Ensuring land is suitable for its current use;
• Ensuring land is made suitable for any new use, as planning permission is given for 
that new use; and
Page 76 of 102

Page 77

• Limiting requirements for remediation to the work necessary to prevent unacceptable
risks to human health and/or the environment in relation to the current use or future
use of the land for which planning permission is being sought. 
Chapter 4: Characteristics of the North Lanarkshire Area
4.1 Geographical Location
North Lanarkshire lies within the basin of the River Clyde and its tributaries, most notably the
Kelvin, North Calder Water and South Calder Water. There are areas of high ground along the
Central Scotland plateau in the east of the area and in the Kilsyth Hills to the north. 
Economically and socially, the area is strongly linked with the city of Glasgow and other
communities of the Clyde Valley and City Deal region.  
Situated in the heartland of Central Scotland, major transport routes play a critical role in the
North Lanarkshire economy. Radiating from Glasgow the A80/M80 is the main strategic link to
Falkirk, Stirling and the north of Scotland, the A8/M8 is the primary link with Edinburgh and the
east of Scotland and the M74 along the southern boundary of North Lanarkshire is Scotland’s
major link to the south. The major rail passenger and freight rail routes from Glasgow to
Edinburgh and the main Scotland/England routes all run through the area. 
4.2 Size
North Lanarkshire covers 47,222 hectares, just over a quarter of which is urban, with
development land covering 3,439 hectares and agricultural land covering 18,066 hectares.  
The National Records of Scotland estimated the population of North Lanarkshire in June 2022
to be 340,930, the 4th highest population out of the 32 local authority areas in Scotland. The
area provides 48% of all the industrial land developed in Glasgow and the Clyde Valley City
Region. Vacant and derelict land continues to account for over 10% of the urban area. 
4.3 Current Land Use Characteristics
Current land use in North Lanarkshire Council reflects the growing trend in much of the west
coast of Scotland where significant regeneration is taking place. As traditional heavy industry
has declined, much of the vacant and derelict land left behind has been used to provide
residential, commercial and light industrial development sites. Heavy industry remains
although largely contained within established industrial sites scattered throughout the
authority. The Scottish Vacant and Derelict Land Survey of 2023 shows that North Lanarkshire
Council is no longer the Authority with the largest percentage (by area) of Derelict and Urban
Vacant land in Scotland, the figures dropping from 1,429 Ha in 2010 to 1,292 Ha in 2023. 
Scottish Vacant and Derelict Land Survey 2023 - gov.scot (www.gov.scot) 
4.4 Historical Information on Contamination
Page 77 of 102

Page 78

North Lanarkshire has a wide and varied industrial legacy due to the abundance of raw
materials such as coal and iron ore.  The area was heavily industrialised by processes such 
as mining and quarrying, gas works, steel works and associated chemical works along with
rail infrastructure. This has left large areas of potential historical chemical contamination that
require attention. Equally, the rural parts of the district remained largely tied to agriculture,
intermixed with quarrying for raw material such as sand and stone to supply local industry.
In order to provide the necessary transport infrastructure that enable large scale industrial
development, extensive evidence of old railway lines, stations and storage facilities intersect
many parts of the urbanised areas of North Lanarkshire. While many of these lines have acted
as the basis of the current rail provision, some parts of the authority evidence old mineral
railway connections, which present a particular challenge when dealing with possible
contaminated sites.  
Many of the towns within the authority also have evidence of old gas works within the town
centres. These tended to appear upon connection to the rail network and subsequently closed
as the energy networks improved. However, because of their central position in towns, many
of these sites have actually been redeveloped and in some cases have been for a considerable
period. Similar to parts of the old railway network, town gas sites present a particular challenge
when dealing with the possibility of contaminated land. 
4.5 Updated information on contamination
North Lanarkshire Council launched its original inspection strategy in 2001. At that time, 5,146
Ha of land (around 11% of the area) was identified as having the potential to be contaminated
land based on former use, pathways and receptors.
Of the 3,650 Ha that have been formally surveyed; 794 Ha went through the reprioritisation
process between 2003 and 2004, 805 Ha between 2004 and 2005,  912 Ha between 2005 and
2006 and between 2006 and 2018, 5,537 Ha have been reprioritised and archived through
both Part IIA and the Planning Regime.  The latest update from 2019 to 2024 has seen 258
Ha remediated via planning this is from 48 sites that have been archived and 11 sites which
have had their boundary reduced and redrawn as not all of the site was remediated.
The number of walkovers has declined in recent years due to a change in focus towards
intrusive investigation on the higher risk sites with gaps in information but attempting to align
with the Council’s ambition strategies and budgetary constraints.  The process of survey,
reprioritisation and voluntary remediation continues. Since 2008, some of the sites previously
identified have been either partly or completely remediated as a consequence of the
development process, regulated through the Town and Country Planning legislation and
associated guidance, rather than Part IIA procedures. Given the drive to regenerate within
North Lanarkshire, this process is at the centre of our strategy to remediate sites. 
In order to assist development and avoid the potential for blight associated with Part IIA
procedures, North Lanarkshire Council has produced a contaminated land guide to
Page 78 of 102

Page 79

development which provides information on how to consider the contaminated land issue when
submitting planning applications or building warrant submissions.
This advice can be found at Development on contaminated land - what you need to know |
North Lanarkshire Council and is available to download. The purpose of this guidance is to
ensure that we have a consistent approach regarding contaminated land and it is designed to
help developers understand some of the challenges with land contamination and ground gas
conditions in North Lanarkshire. 
4.6 Key Water Resources / Protection Issues
Scotland has one of the best quality water environments in Europe and this deserved
reputation contributes to the country’s economic and social well-being.  Alongside improving
the condition of water bodies and protected areas that are not in a good or excellent condition,
we need to maintain the quality of those that are. Preventing deterioration of the water
environment, including drinking water sources, is a key purpose of this plan.  It is a significant
and constantly evolving challenge as pressures shift and change, and as more water bodies
are restored to a good condition over the period 2015 to 2027.  As an authority we are required
under the current legislative regime to work in partnership with SEPA to help protect Key Water
Resources for the future.
The Water Environment (Controlled Activities) (Scotland) Regulations 2011 (CAR) and the
amendments apply regulatory controls over activities which could possibly affect the water
environment.
The River Basin Management Plan for the Scottish River Basin District: 2015 – 2027 builds on
the first river basin management plan for the Scotland river basin district, published in 2009. It
sets revised objectives for the 12-year period from 2015 to the end of 2027 and a strengthened
programme of measures for achieving them.
SEPA has carried out formal River Classification of the main surface water features in North
Lanarkshire Council. The classification scheme relates to the chemical, biological, aesthetic
and nutrient content of surface waters and grades them from Good Condition through
Moderate and Poor to Bad. Currently in North Lanarkshire, there are 6 rivers in good condition,
15 in moderate condition, 19 in poor condition and 1 in a bad condition. A summary list of all
river conditions within North Lanarkshire can be found at
https://informatics.sepa.org.uk/WaterClassificationHub/   
The North Lanarkshire area does not include any aquifers designated as major sources of
drinking water but the general condition of many of our ground waters are classed as poor due
to legacy pollution from heavy industry. Improvement work is required as development takes
place to improve the water environments in North Lanarkshire which the authority will aim to
support in partnership with other public bodies and stakeholders as defined by SEPA’s current
priorities more in relation to that can be found at water-groundwater.pdf. 
Page 79 of 102

Page 80

Chapter 5: Overall Aims, Objectives and Priorities
A key aim of North Lanarkshire Council has been to adopt a methodology, which will assess
the possibility of significant harm where it could cause a human health effect, an ecological
effect, an animal or crop effect, a building effect, or where a water environment may be
affected.
5.1 Aims of the Inspection Strategy:
• Under the Environmental Protection Act 1990, the council has a responsibility to inspect
the area from time to time in order to identify contaminated land
• To continue to enhance, improve and update the methodology used to identify
potentially contaminated sites in a strategic manner as required by the legislation
• To continue to prioritise the inspection of sites in an impartial manner based on (so far
as reasonably practicable), robust, publicly available data sources
• To continue to provide an auditable path to prioritisation
• To continue to inspect sites in a cost-effective manner, identifying, where reasonable,
all previous work prior to undertaking any further investigation
• To maintain a database of all relevant data pertaining to potentially contaminated sites
• To continue to work with relevant internal and external stakeholders to improve the
understanding of Part IIA of the Environmental Protection Act 1990 and how it interacts
with the services they provide
• To secure the remediation of contaminated land as defined under Part IIA of the
Environmental Protection Act 1990. 
5.2 Objectives of the NL Contaminated Land Strategy
• To inspect our area from time to time to identify contaminated land
• To determine whether a particular site meets the definitions of contaminated land as
defined under Part IIA
• To establish responsibility and liability for remediation of contaminated land
• To ensure that appropriate remediation of contaminated land takes place 
• To keep a public register detailing regulatory action as defined under Part IIA
• To assist in the delivery of the Plan for North Lanarkshire by improving the health and
care of our communities and encouraging economic growth and development
• To recognise and incorporate recent legislative changes
• To update the CL strategy by providing greater detail of the approach being taken by
North Lanarkshire when investigating potentially contaminated land sites based on past
experiences
• To inform neighbouring authorities, partner organisations, statutory and non-statutory
consultees of North Lanarkshire Council the aims and objectives of the strategy.
The main objective originally set in 2001 related to the identification of locations within North
Lanarkshire Council with the highest potential to be contaminated as defined under Part IIA. 
Page 80 of 102

Page 81

This has been achieved and prioritisation of certain potential sites has been undertaken
however, work is ongoing to refine the assessment.
As a result of the reprioritisation process, North Lanarkshire Council is building a list of 
locations where intrusive work may be required to obtain further information around the
contaminants and risk of these sites. The locations will be based on the potential seriousness
of risk with priority on human health and possible future use of the site. 
Remediation through planning development is the main driver now to remove sites from the
potentially contaminated list and in 2024 a significant project commenced to ensure that all
sites which had been remediated through development planning conditions since 2020 was
undertaken to update our Geo Environs Contaminated Land Management System (MS). This
process risked these sites according to their new improved updated status.  This work has now
been implemented and the Geo Environs MS has been populated with past and current data
giving a more accurate position of the potentially contaminated land sites in North Lanarkshire.
Further to the above, the strategy will also prioritise sites which require to be developed to
ensure that the council delivers its regeneration programme of works in relation to house
building, town centre regeneration, cemeteries expansion, allotment provision linked to the
‘grow your own food’ programme and contribute to the phases of development for Ravenscraig
in line with the revised Masterplan. 
5.3 Priorities
The Council’s priorities when dealing with contaminated land are to:
Protect Human health
The water environment
Designated ecosystems
Prevent Damage to property
Further contamination of land
Encourage Voluntary remediation
Re-use of brownfield sites
Stimulate Economic growth 
On rare occasions there are certain situations that North Lanarkshire Council would propose
to enhance the normal timescale for inspection and assessment:
Critical or emergency situations requiring accelerated action under Part IIA
Where these situations arise, similar standards of investigation, assessment and monitoring
will be undertaken as a priority. This has occurred twice in recent years, once following an
Page 81 of 102

Page 82

alleged human health complaint in the Motherwell area, and soil contamination in the gardens
of two private households, which resulted in the Council’s first Part IIA designation.
Sites important for the implementation of major projects conforming to Council
ambition strategies and involving Council owned property 
Where sites are identified for development through appropriate Council strategies and plans
and are also considered as potentially contaminated land sites under the North Lanarkshire
Council Contaminated Land Strategy, early prioritisation and subsequent
inspection/assessment works may be undertaken to progress these sites. Examples include
works associated with delivery of the revised Ravenscraig Masterplan and delivery of the
Council’s ambitious house building programme. 
Sites with past NL Authority involvement
Sites where North Lanarkshire Council (and predecessors) may be the ‘appropriate person’
may be subject to early inspection/ assessment. An example of this is the former tar works at
Stane Gardens, Shotts that required immediate investigation and action following the
identification of high levels of contamination. This resulted in a significant remediation and
regeneration programme in partnership with SEPA. The outcome from this project not only
addressed the contaminated land issue but also resulted in the restoration of the South Calder
River and the creation of a country park facility within the heart of the local community.  The
water environment has been significantly improved with this project along with land
remediation. 
Cross Boundary Sites
Where suspected contaminative sites are identified within the Inspection Strategy and are
partly contained within another unitary authority boundary, arrangements will be made with the
appropriate authority to discuss the appropriate way to progress these sites. Where another
unitary authority approaches North Lanarkshire Council regarding a site or suspected site
which partly intrudes into their boundaries, similar levels of discussion will be initiated to
discuss the most appropriate way forward taking into account our current strategy. 
Chapter 6: Procedures
The process of implementing Part IIA results in the generation of large amounts of data. This
information will be used for a variety of purposes including prioritising sites, reporting to SEPA
and communicating risk to professional consultants and the general public. The data resource
will also form the basis of an historical land use archive, which will be used for many years to
come. It is hence important that a robust and flexible data management system is employed
for managing all of this data.
The information management system must be:
• Secure
• Capable of logging all information provided with respect to individual areas of land
Page 82 of 102

Page 83

• Able to tag information type (e.g. commercially confidential, subject to national security
constraints, possible blight etc.)
• Capable of being audited to ensure that any information held is both accurately
recorded and up to date.
North Lanarkshire will be able to give all relevant stakeholders such as SEPA, members of the
public etc. access to the data in electronic format such as a spreadsheet or in the form of a
GIS layer or as appropriate. The public registers will be in electronic form. 
North Lanarkshire Council has adopted the Geo Environs Contaminated Land Management
System produced by STM Environmental which is linked to our GIS system.  There has been
a GIS layer of potentially contaminated land sites produced which is shared internally with
appropriate colleagues in Planning and Building Standards. 
6.1 Geo Environs Site Prioritisation Module
The Geo Environs (a collection of data management software applications widely used by
environmental professionals in the UK and abroad) Site Prioritisation Module is the ideal
solution for managing the prioritisation of potential Part IIA sites. The system consists of an
SQL Microsoft access database (i.e. Microsoft SQL Server) and a seamless integration to GIS,
ArcGIS in this case, facilities that allow for easy management, visualization and reporting of
any potentially contaminated land data. The system provides us with a two-stage prioritisation
system:
Stage 1 Makes use of desk-top based information (i.e. GIS layers) to allow you to
rapidly prioritise the sites for inspection
Stage 2 Allows better characterization of high-risk sites for further investigation 
The system allows us to quickly and easily produce individual risk ranking reports for each
individual receptor category (i.e. human health, groundwater, surface water, ecology,
property). The authority has the added flexibility of being able to produce risk ranking reports
based on the total combined receptor scores the reports allows us to group the sites into risk
categories (i.e. High, Medium, Low) depending on the risk score allocated to them.  Due to the
prioritisation scores being calculated within the database, the generation of the  risk ranking
reports is instantaneous.
The system includes extensive facilities to add user defined fields to the database so that we
can add any type of information the user considers relevant to a site record. Going forward,
the inspection process will continue to be progressed by the use of Arc Pro View GIS and Geo
Environs. Geo Environs will also continue to be routinely updated with any new relevant
information received mainly from planning and development consultations. This has proven to
be a very important way of maintaining current, reliable and meaningful datasets to progress
the inspection strategy.
Page 83 of 102

Page 84

The methodology employed by the Geo Environs system assesses significant harm where it
is causing any or all of the following effects – on Human Health, on the Ecological System, on
Animals or Crops, on Buildings and where the water environment may be polluted. The
database uses up to date publicly available datasets from reliable organisations to identify
sources, pathways and receptors thus prioritising the locations categories through a series of
risk ranking scores  that scales potential risk according to the severity of source, efficiency of
pathway and sensitivity of receptor. Full details of the methodology employed to achieve
prioritisation can be obtained from the Pollution Control team at North Lanarkshire Council, 
Protective Services, 2nd Floor Civic Centre, Windmillhill Street, Motherwell,  ML1 1AB. This
methodology is summarised below:
1 Undertaking a Phase I investigation of prioritised contaminated land sites involving
desk studies, site walkover, collection of physical data (if appropriate) and
development of a Conceptual Site Model. The completion of this phase will involve a
risk-based assessment being undertaken to establish if it is likely that a contaminant
is actually present, and a receptor is actually or likely to be present and linked to the
contaminant.
2 Undertaking a Phase II investigation, which is likely to involve staged ground
investigation works and further refinement of the risk assessment and conceptual
site model in a cost-effective manner. These works require to be designed and
planned around the Conceptual Site Model established by the risk assessment in
Phase 1. Upon completion of these ground investigations, risk assessment and
evaluation on the evidence provided will identify what, if any, actions are necessary 
3 Liaison with SEPA where there is pollution or likely pollution of the water environment
or if the pollution of the water environment will result in deterioration of the water
body status, if the site is likely to be determined a Special Site or is suspected of
being radioactively contaminated 
Chapter 7: Remediation
If, following an investigation, the Council identifies land as contaminated it must then consider
the nature and extent of remediation that is deemed necessary to be carried out.
1 North Lanarkshire Council remains committed to working with all stakeholders during
the investigation process to achieve remediation of land that is potentially
contaminated. 
The council will always seek voluntary remediation as a preferred course of action
when dealing with sites that fall within the scope of Part IIA.
2 Due to the urbanised pattern of historical contaminative uses, a number of potentially
contaminated sites previously identified by the prioritisation methodology have
undergone remediation as part of the planning framework, where either the applicant
Page 84 of 102

Page 85

has ensured that the sites is decontaminated prior to development, or the developer
complies with decontamination requirements as part of development.
3 Due to the heightened awareness of the contaminated land regime and the
implications of Planning Advice Note 33 (PAN33) on development, it is anticipated that
an increasing number of sites identified by the methodology employed will be
remediated in this manner.
4 Land, which is not statutorily contaminated because of its current use, may become
so if either a pathway or new receptors are introduced as a consequence of
development. North Lanarkshire Council must ensure that any development proposed
on historically contaminated sites is ‘suitable for use’ on completion.
To achieve this, close liaison between Planning Service, Building Standards and the
Pollution Control Section is essential.
5 Pollution Control will seek to work closely with relevant colleagues within the Council
to investigate and assess land proposed for future development to ensure that there
is full transparency when engaging with proposed developers. 
North Lanarkshire Council has a Policy on the Recovery of Costs Associated with the
Remediation of Contaminated Land. Where North Lanarkshire Council exercises its powers of
remediation under Part IIA of the Environmental Protection Act 1990, it will seek to recover all
costs to which it is entitled. The Council will follow the “polluter pays” principle, by virtue of
which the costs of remediating pollution are to be borne by the polluter. The Council will aim
to ensure that the overall result is as just, fair and equitable as possible to all those who have
to meet the costs of remediation, including local and national taxpayers whilst taking into
account Best Value principles. 
Chapter 8: Information Management
All information relating to studies and investigations undertaken by North Lanarkshire Council
in relation to this strategy will be held in the Geo Environs Contaminated Land Management
System. This database is stored on a dedicated server, has password security and access is
restricted to members of the Pollution Control Section. 
The Geo Environs Contaminated Land Management System is a bespoke database, which
forms a key element of the strategy and can store site inspection records, textual reports and
photographs and all other site-specific data. This information is backed up on a daily basis. 
Chapter 9: Public Registers
North Lanarkshire Council is obliged to maintain a public register containing details prescribed
in Schedule 4 of the Contaminated Land (Scotland) Regulations 2005. This register will be
Page 85 of 102

Page 86

available for inspection at the offices of the Pollution Control team. North Lanarkshire Council
currently has two sites listed on its Contaminated Land Register, both of which are in the
Coatbridge area, and they have now been successfully remediated.  Legislative reform may in
the future allow for these sites to be removed from this register but at present there is no
mechanism for this to happen.  
Chapter 10: Complaints and Requests for Information
Complaints from members of the public, businesses and voluntary organisations will be logged
and responded to in accordance with normal Council procedures. The Pollution Control team
works within ISO 9001 Quality procedures and has a specified timescale for responding to any
complaint. Requests for information under the Freedom of Information (Scotland) Act 2002 are
addressed directly by a specified Freedom of Information officer, who coordinates and collates
responses. Environmental Information requests can also be made to the Council for specific
site information however, there is a charge for this information and more information in relation
to this can be found at Environmental health fees and charges | North Lanarkshire Council
Emerging contaminated land issues will be investigated and where required the matter will be
highlighted to colleagues in other service areas but in particular to Corporate Communications
to ensure that a consistent message is agreed with necessary information to be disseminated. 
Chapter 11: Liaison and Communication
11.1 Liaison with Consultees
North Lanarkshire Council recognises that effective interaction with SEPA is the first essential
step in securing successful implementation of Part IIA responsibilities. Communication will
occur as follows:
• Consultation with SEPA when reviewing the Contaminated Land Strategy
• Obtaining relevant datasets from SEPA (as required) 
• Liaising with SEPA in relation to special sites and sites potentially contaminated by
radioactivity
• Providing SEPA with the necessary information for inclusion in the state of contaminated
land report
• Liaison with SEPA if pollution of the water environment is occurring or likely to occur or if
the pollution of the water environment will result in deterioration of the water body status
If North Lanarkshire Council identifies a potential Special Site, a written request will be made
to SEPA for any supporting information. Information received will be reviewed, collated and
added to the Geo Environs Contaminated Land Management System before further
investigations are considered and a scope agreed. Liaison with SEPA will continue throughout
this process and appropriate interaction will take place on a site-by-site basis. SEPA will be
consulted immediately, in writing, prior to any designation of a Special Site. All requests to
SEPA will be made using the appropriate COSLA forms, as necessary. 
Page 86 of 102

Page 87

Table 1 below provides a list of the key statutory and non-statutory consultees relevant to Part
IIA.
Table 1. List of Consultees
Consultees Consultees
City of Glasgow Council Other Council Services
Community Councils Scottish Enterprise
East Dunbartonshire Council Scottish Government
Falkirk Council Scottish Natural Heritage
Food Standards Scotland SEPA
NHS Greater Glasgow and Clyde  South Lanarkshire Council
Health and Safety Executive  Stirling Council
Historic Scotland   The Coal Authority
NHS Lanarkshire  West Lothian Council 
Chapter 12: Review Mechanisms
Every 5 years, the Strategy for the Inspection of Contaminated Land and the subsequent
outcome of the Geo Environs Contaminated Land Management System and the prioritisation
process will be reviewed. The Geo Environs Contaminated Land Management System
provides flexibility to add, update and augment data sets as they change or become
superseded. North Lanarkshire Council intends to run this model annually moving forward to
present the authority with an understanding of the improved position and this will be reported
as part of the Protective Service annual performance report. It is necessary to permit the
authority to inspect their area from time to time.
Similar drivers for review include:
1 Significant changes in land use
2 Significant legislative changes
3 Information from the public
4 Information from external bodies e.g. SEPA, HSE, Scottish Land Commission
5 Unplanned events – major pollution incidents
6 Following receipt of remediation and validation information  
Chapter 13: Timescales and Progress to Date
13.1 Progress Update
Currently there are 7,090 sites of potentially contaminated land within North Lanarkshire
making up 7,207Ha of land. This is a further reduction and illustrates the previous strategies
have been successful.  The table below illustrates the progress made so far as part of  the
programme of works concentrated on the highest priority sites.
Page 87 of 102

Page 88

Table 2. Year on Year Progress
Year Walkovers
Completed
Intrusive
Investigations
Archived Land
(Hectares)
Part IIA
Designations
2010 250 11 
5,537 Ha 
0
2011 70 7 0
2012 0 5 0
2013 200 3 0
2014 218 6 0
2015 74 1 0
2016 0 6 2
2017 0 3 0
2018 0 5 0
2019 0 1 
941 Ha 
0
2020 0 3 0
2021 0 3 0
2022 0 3 0
2023 0 0 0
2024 0 1 0 
Work will now continue to assess the remaining sites with the intention of further reducing the
overall number of contaminated sites and bringing them into productive use and in turn
contribute to the overall aim to ensure that North Lanarkshire is the place to live, learn, work,
invest and visit in line with the Plan and Programme of Work. 
13.2 Future Tasks & Timescales 
North Lanarkshire Council will formally review their Contaminated Land Strategy every 5 years
provided there have been no significant changes that may instigate a review before that date.
This will include checking to identify any potential gaps or procedural changes that require to
be made to the document to keep it relevant to current practice.  
All previous activities listed in last strategy have been completed or are ongoing because the
task is continuous and requires to be updated annually.  Table 3 below outlines objectives and
actions that the authority and Protective Services require to consider for the next 5-year period.
Table 3. Detailed Objectives, Actions & Proposed Timescales
Objectives & Actions  Target Outcome 
Prepare, consult and publish the reviewed Contaminated
Land Strategy 
2030 Updated
Strategy
Continue to liaise with other Council services relating to the
inspection and investigation of land suspected of falling within
Part IIA including Cemeteries, New Build Housing, Hub
Projects, City Deal, Ravenscraig and Greenspace
Community Allotments. 
Annually Specific
Projects
detailed in
Service Plan
Annually
Detailed review, update and run of the Geo Environs
Contaminated Land Management System to produced
annual report of sites and hectares that remain potentially
contaminated. 
Annually Report data in
Protective
Services
performance
report
annually
Page 88 of 102

Page 89

Carry out an options appraisal for the replacement of Geo
Environs as this is an Access Database Management System
that is nearing the end of its life and will likely require to be
replaced within the next three years as it may become
unsupported. 
End of 2028 Complete
Options
appraisal for
new MIS for
CL 
Continue programme of intrusive site investigations, looking
at possible data gaps in our ongoing progress report model. 
Annually Specific
Projects in
Service Plan
Continue to provide GIS layer of potentially contaminated
land sites within NL to colleagues internally and be open to
discussions on providing this spatial data to government
agencies and public partners as models develop 
Continuous Protective
Services CL
GIS Layer to
be provided
corporately
Continue to develop the mine gas risk tool which has been
designed for internal use within NL to assist colleagues with
making informed decisions in relation to sites with future
intended uses considered. 
Annual
development
and
maintenance
Specific
development
or updates to
be detailed in
Service Plan
The authority should look to work with partners to influence
improvements where possible in water quality of rivers and
groundwater. 
As
opportunities
present
Improvements
, if possible, to
river water
quality
Consider any legislative changes which may occur and
ensure that the authority takes cognisance of such change
and incorporates these into the statutory work as required. 
As required  Legal
compliance 
Page 89 of 102

Page 90

Page 90 of 102

Page 91

North Lanarkshire Council
Report
Environment and Climate Change Committee 
Does this report require to be approved? ☒ Yes ☐ No
Ref: LR/CW Date: 05 February 2025 
Contract Award for Supply and Delivery of Liquid Fuels 
From  Lyall Rennie, Chief Officer (Community Operations) 
E-mail Renniely@northlan.gov.uk Telephone: 07855 193500 
Executive Summary 
The Committee is asked to approve the award of a contract extension for the Supply and Delivery of
Liquid Fuels (the ‘Agreement’) to Highland Fuels Limited and Certas Energy Limited t/a Scottish
Fuels. 
The initial Agreement was put in place on behalf of the Scottish Public Sector by Scottish
Procurement (a division of the Scottish Government) from the Call-off contracts from the Crown
Commercial Service (CCS) (a division of the UK Government) National Fuels Framework RM6177
for the Supply of Liquid Fuels. This was for a period of 24 months that commenced on 01 April 2023
and shall expire on 31 March 2025.   
Scottish Procurement have now taken up the option of a 24-month extension period for the Call-off
contracts from 01 April 2025 until 31 March 2027 allowing all Scottish Public Sector to take up a 24-
month extension to their current call-off contracts. Fleet Services would like to take up this extension. 
The maximum value of the Agreement shall not exceed Five Million Pounds Sterling (£5,000,000.00)
exclusive of VAT. 
Recommendations
It is recommended that the Environment & Climate Change Committee: 
(1) Approves the award of a 24-month extension Agreement to Highland Fuels Limited and
Certas Energy Limited t/a Scottish Fuels at the maximum value of Five Million Pounds
Sterling (£5,000,000.00) exclusive of VAT. 
The Plan for North Lanarkshire 
Priority All priorities 
Ambition Statement (17) Ensure we keep our environment clean, safe, and attractive 
Programme of Work Statutory / corporate / service requirement 
Item 6
Page 91 of 102

Page 92

1. Background 
1.1 The Council like many other large scale public and private organisations, has an ongoing
demand for liquid fuels i.e. petrol, diesel, “red diesel”, kerosene etc.. Liquid fuels are used by
the Council for a variety of reasons including powering vehicles, equipment, tools etc. as well
as providing a heat source for several buildings. 
1.2 Historically, the Councils liquid fuels provision have been procured by accessing third-party
arrangements put in place on behalf of the public sector by Scottish Procurement and CCS. 
1.3 With the introduction of the next generation of the CCS “Fuels 2” framework agreement,
Scottish Procurement undertook a further competition from this CCS framework on behalf of
the Scottish Public Sector to consolidate its fuel supply which the Council participated in. 
1.4 Following the exercise undertaken by Scottish Procurement, the Council received a
recommendation in late April 2023 for the Council to develop its fuels supply away from the
traditional one supplier approach and split it into two based on pricing models received for
fuel types the Council mainly requires. 
1.5 This recommendation from Scottish Procurement was based on historic spend information /
usage outlays and recent inflation trends and projections given the volatility of energy
markets. 
1.6 The requirements within the initial Agreement are with Highland Fuels Limited and Certas
Energy Limited t/a Scottish Fuels. This Agreement is due to expire on 31 March 2025, the
Scottish Government have offered an extension of a further 24 months from 1 April 2025 to
31 March 2027.
______________________________________________________________________________ 
2. Report 
2.1 The initial process involved a user intelligence group (the ‘UIG’) of technical and procurement
representatives within the Council who liaised with Scottish Procurement and they undertook
to agree the procurement strategy that would deliver maximum benefit for the Council via the
Agreement. 
2.2 The initial Agreement award recommendation was made on the basis of the justification and
guidance from Scottish Procurement and following completeness checks undertaken by the
Councils Corporate Procurement Team. It was the recommendation of Scottish Procurement
that Highland Fuels Limited should supply diesel only with Certas Energy Limited t/a Scottish
Fuels supplying all other fuel types.   
2.3 In November 2024, Scottish Procurement notified Councils that they had taken up the option
of a 24-month extension period for the Call-off contracts for the Supply of Liquid Fuels from
CCS’ National  Fuels Framework RM6177 to Certus Energy UK Ltd trading as Scottish Fuels
and Highland Fuels Ltd from 01 April 2025 until 31 March 2027. This would allow all Scottish
Public Sector to take up a 24-month extension to the current call-off contracts. 
2.4 The benefits in taking up the last 24-month extension would be supplier continuity and
delivery and  will allow adequate time to run a procurement exercise specifically tailored for
Scottish customers in  2026 under the upcoming CCS National Fuels 3 Framework. 
2.5 Further details of the procurement procedure is provided in Appendix 1 and the SME status
and location of the tenderer is located within Appendix 2.  Page 92 of 102

Page 93

2.6 The maximum value of the extension Agreement shall not exceed Five Million Pounds
Sterling (£5,000,000.00) exclusive of VAT. 
Financial / Budget Consideration 
2.7 The costs associated with contract delivery will be contained within the revenue budgets for
various Council service areas however the main spend area is within Waste Solutions and
Fleet, Community Operations. 
Price Stability 
2.8 Pricing within the Contract will be subject to variance throughout its duration. Price stability
and application will be undertaken By Scottish Procurement on behalf of the Council. 
Community Benefits 
2.9 The Council is committed to maximising the delivery of community benefits. For this
Agreement, community benefits will be delivered at a national level given the large-scale
collaborative approach taken. 
Fair Work First  
2.10 The Council is committed to maximising the delivery of the Fair Work First commitment.  For
this Agreement, Fair work First commitments will be delivered at a national level given the
large-scale collaborative approach taken. 
Contract Management 
2.11 Officers from Community Operations (with assistance from the Energy Team, Assets and
Procurement) will be responsible for managing the Agreement which will be undertaken in
accordance with the Councils agreed approach to contract and supplier management. 
3. Measures of success 
The Agreement will deliver the following outcomes: 
3.1 The Agreement will ensure the Council shall have continuity of supply and delivery for liquid
fuel whilst also achieving best value on behalf of the Council. 
4. Supporting documents 
Appendix 1 Summary of Procurement Process
Appendix 2 SME Status and Location of All Tenderers 
Lyall Rennie
Chief Officer (Community Operations)  Page 93 of 102

Page 94

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Budget in place for the requirements. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data? 
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-mailed to
dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐   Page 94 of 102

Page 95

5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts, highlighting
where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk
Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does
it relate to healthcare, housing, or education services for in-Service or ex-Service
personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to ensure
there has been appropriate consideration of the particular needs of the Armed Forces
community to make sure that they do not face disadvantage compared to other citizens in
the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service delivery,
policy, or plan that has an impact on children and young people up to the age of 18, or on
a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been made
to ensure there has been appropriate consideration of the relevant Articles from the United
Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been carried
out? 
Yes ☐ No ☐  
Page 95 of 102

Page 96

Appendix 1 – Summary of Procurement Process 
Response
CPT Contract Reference Allocated: NLC-CPT-23-010
Procurement Procedure Utilised: Scottish Government collaborative call from the
Crown Commercial Services (CCS) framework
Governing Legislation / Regulations: Public Contracts (Scotland) Regulations 2015
Date Contract Strategy Approved: 11 December 2024
Number of Recommended Tenders: 2
Anticipated Start Date of the Agreement: 01 April 2025
Total Agreement Period (Months): 24 
Awarded Value of the Agreement: £5,000,000 
Page 96 of 102

Page 97

Appendix 2 – SME Status and location of all Tenderers 
Name of Tenderer
Size of Tendering
Organisation
(Micro, Small,
Medium or Large)
Location
(Local Authority /
Council Area)
Highland Fuels Limited Medium Highland
Certas Energy Limited t/a Scottish Fuels Large Falkirk 
Page 97 of 102

Page 98

Page 98 of 102

Page 99

North Lanarkshire Council
Report
Environment and Climate Change Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    JMcK/CPT Date 05/02/25 
Contracts Awarded Below Committee Approval Threshold 
From  James McKinstry - Chief Officer (Assets and Procurement)  
E-mail McKinstryJ@northlan.gov.uk  Telephone 07939 281102 
Executive Summary
In accordance with the Council’s General Contract Standing Orders (“GCSOs”), GCSO
21.10 requires a summary report be presented to members with details of contracts
awarded since last committee, specifically for the spend range: 
• over £50,000 but below £500,000 for supplies or services; and,
• over £500,000 but below £2,000,000 for works. 
Recommendations
It is recommended that the Environment and Climate Change Committee: 
(1) Acknowledge the contract awards made since last committee reporting cycle. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Item 7
Page 99 of 102

Page 100

1. Background 
1.1 The Local Government (Scotland) Act 1973 section 81 requires local authorities to
“…make standing orders with respect to the making by them or on their behalf of
contracts for the supply of goods or materials or for the execution of works.”. 
1.2 The Council’s General Contract Standing Orders (“GCSOs”) set out the council’s
specific procurement procedures and responsibilities at all spend levels, and include
the reporting requirements of procurement activity, including contracts awards, to
committee for either approval or acknowledgement. 
2. Report 
2.1 In accordance with GCSO 21.10, this report summarises the contract awards since last
committee, specifically for the spend range: 
• over £50,000 but below £500,000 for supplies or services; and,
• over £500,000 but below £2,000,000 for works. 
2.2 If you require further information regards the contract awards reported, please refer to
the lead service area / Chief Officer detailed in the appendix. 
3. Measures of success 
3.1 All requirements contracted contribute to either the council’s programme of work and/or
fulfil a statutory requirement. 
3.2 All contract awards secure best value for the council in accordance with their evaluation
criteria. 
3.3 All necessary diligence has been undertaken in the evaluation and appointment of
contractors. 
3.4 All contract awards are logged in the council’s contract register. 
4. Supporting documentation 
4.1 Appendix 1 – Summary of contracts awarded. 
James McKinstry
Chief Officer (Assets and Procurement) 
5. Impacts 
5.1 Impacts considered as part of the contract award procedures are recorded in the
individual contract award reports held by the lead service area.  
Page 100 of 102

Page 101

Appendix 1 – Summary of Contracts Awarded 
Contract Ref NLC-SLP-23-122
Title NEC4 Contract Management Solution
Classification Supplies
Lead Service Area / Chief Officer Lyall Rennie, Chief Officer (Community Operation)      
Competition Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on 3rd party frameworks
Procurement Route Call-off following Direct Award using Third Party Framework
No. of Framework Contractors 27
Award Criteria Best Value assessment, in accordance with the Framework Information
Comments This has been procured via Direct Award approach, considering the relevant information on 
Framework Contractors technical and commercial proposals available through NHS Digital Workspace
Solutions Framework.     
Award
Details
Value £407,258
Contract Duration 36 months initial term, with option for further 12 months
Contractor Name Softcat PLC
Contractor Size Large Company
Contractor Location Buckinghamshire, UK
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? Yes      
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality Duty
and Fairer Scotland Duty
☐
HR Policy Impact ☐ Data Protection Impact ☐ Environment / Carbon
Impact ☐
Risk Impact ☒ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☐
Communications Impact
☐
Armed Forces Covenant
Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer       
Page 101 of 102

Page 102

Contract Ref NLC-SLP-24-083
Title Digital Road Condition Management Solution
Classification Supplies
Lead Service Area / Chief Officer Lyall Rennie, Chief Officer (Community Operation)      
Competition Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on 3rd party frameworks
Procurement Route Call-off following Direct Award using Third Party Framework
No. of Framework Contractors 27
Award Criteria Best Value assessment, in accordance with the Framework Information
Comments This has been procured via Direct Award approach, considering the relevant information on 
Framework Contractors technical and commercial proposals available through NHS Digital Workplace
Solutions SBS/19/AB/WAB/9411.     
Award
Details
Value £150,000
Contract Duration 36 months
Contractor Name Softcat PLC
Contractor Size Large Company
Contractor Location Buckinghamshire, UK
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? Yes      
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality Duty
and Fairer Scotland Duty
☐
HR Policy Impact ☐ Data Protection Impact ☐ Environment / Carbon
Impact ☐
Risk Impact ☒ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☐
Communications Impact
☐
Armed Forces Covenant
Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer       
Page 102 of 102