Agenda Document Pack - Environment and Climate Change Committee - 21/08/2024

North Lanarkshire Council · 21 August 2024
Back to Environment and Climate Change Committee — 21 August 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

12 August 2024 
Members of the 
Environment and Climate Change Committee
Chief Executive’s Office
Archie Aitken
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk 
Notice is given that a Meeting of the Environment and Climate Change Committee is to
be held in the Council Chamber, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on
Wednesday, 21 August 2024 at 14:00 PM which you are requested to attend. 
The agenda of business is attached. 
Archie Aitken
Chief Officer (Legal & Democratic) 
Members : 
Clerk Name: Clare Louise McDonald
Clerk Telephone: 01698 302058
Clerk Email: mcdonaldcl@northlan.gov.uk 
H Loughran, J McPhilemy, T Carragher, P Di Mascio, K Duffy, F Fotheringham, W Goldie, K
Harmon, J Leckie, F MacGregor, A Masterton, M McBride, B McCulloch, M McCulloch, F
McKay, C McManus, L Nolan, J Reddin, L Roarty, G Robinson, A Smith, A Thomas, C
Williams, N Wilson, G Woods.  
Page 1 of 204

Page 2

Page 2 of 204

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical
Standards In Public Life Etc. (Scotland) Act 2000   
Operational   
2 Flood Risk Management Plan
Submit report by the Chief Officer (Place) providing an
update on progress to deliver Flood Risk Management
Plans throughout North Lanarkshire. 
7 - 16 
3 Update on Parking Enforcement
Submit report by the Chief Officer (Place) providing an
update on the progression towards the enforcement of
new parking regulations. 
17 - 22 
4 Sustainable Futures - Burial Space Strategy and
Cemeteries Creation Projects
Submit report by the Chief Officer (Community
Operations) seeking approval to seek alternative sites
for a replacement cemetery in Coatbridge. 
23 - 32 
5 Sustainable Futures - Country Parks for the Future
Update
Submit report by the Chief Officer (Community
Operations) detailing a progress update on the Country
Parks for the Future project and seeking delegated
authority for the Chief Officer (Legal and Democratic) in
conjunction with the Chief Officer (Community
Operations) to progress the award of the contract for
the redevelopment of the Watersports Centre, circa
£14 million, following completion of the procurement
process undertaken with Hub South West. 
33 - 42 
6 Winter Service Policy and Procedures 2024/2025
Submit report by the Chief Officer (Community
Operations) seeking approval of the Winter Service
Policy and Procedures for 2024/25. 
43 - 62 
7 Business Regulation Service Plan 2024-2025
Submit report by the Chief Officer (Community
Operations) seeking approval of the Business
Regulation Service Plan 2024-2025. 
63 - 110
Page 3 of 204

Page 4

8  Fly-Tipping – Steps Taken to Counter the Increase
in Criminal Activity
Submit report by the Chief Officer (Community
Operations) detailing the steps taken by Protective
Services’ Pollution Control & Public Health team to
counter the increase in criminal activity. 
111 - 124 
9 Trading Standards – Underage Sales, Illicit
Tobacco and Vaping Products
Submit report by the Chief Officer (Community
Operations) providing details on the level of
enforcement activity. 
125 - 136 
10  Introduction of Living Christmas Trees
Submit report by the Chief Officer (Community
Operations) detailing the investigations undertaken
regarding the installation of living Christmas Trees
within communities following approval by the Council
meeting of the 28 March 2024. 
137 - 148 
11  Land and Waste Service Review
Submit report by the Chief Officer (Community
Operations) providing an update on the service review
being undertaken across the Land and Waste services. 
149 - 154  
Performance   
12  Amey Public Services LLP: Operational
Performance Monitoring Report for 1 November
2023 to 31 March 2024, Financial Performance at 31
December 2023
Submit report by the Chief Officer (Community
Operations) outlining Amey Public Services (APS)
Limited Liability Partnership (LLP) performance against
its’ business objectives and council priorities for the
period from 1 November 2023 to 31 March 2024 and
its’ financial performance to December 2023. 
155 - 166 
13  Annual Report on the Performance of North
Lanarkshire Council from the Scottish Roadworks
Commissioner
Submit report by the Chief Officer (Community
Operations) providing details of the Scottish Road
Works Commissioner’s Performance Review in relation
to Road Works undertaken by North Lanarkshire
Council during 2023/24. 
167 - 184
Page 4 of 204

Page 5

Contracts   
14  Contract Award for Bridge Inspections 2024/25
Submit report by the Chief Officer (Place) advising of
the award of the Contract to AtkinsRealis Limited at the
value of Seven Hundred and Forty Thousand, One
Hundred and Seventy-Four Pounds Sterling and
Seventeen Pence (£740,174.17) exclusive of VAT. 
185 - 194 
15  Contract Award for Provision of an Enterprise
Management Solution (CONFIRM)
Submit report by the Chief Officer (Community
Operations) advising of the award of the Agreement to
Computacenter (UK) Ltd up to a maximum value of Six
Million, Forty-Nine Thousand and Forty-Nine Pounds
Sterling (£6,049,049). 
195 - 204 
Page 5 of 204

Page 6

Page 6 of 204

Page 7

North Lanarkshire Council
Report
Environment and Climate Change Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref SB/PH Date 21/08/24 
Flood Risk Management Plan 
From  Pamela Humphries, Chief Officer (Place)  
E-mail Scottjohn2@northlan.gov.uk Telephone John Scott,
07923100254 
Executive Summary 
The purpose of this report is to provide an update on progress to deliver Flood Risk
Management Plans throughout North Lanarkshire. This is a deliverable within the Sustainable
Futures Programme of Work under climate resilience and flood risk management. In addition,
committee approval is sought for the methodology of how resources are prioritised to manage
flood risk to areas of greatest need. 
The Council has a statutory duty under the Flood Risk Management Act to reduce flood risk
throughout North Lanarkshire. Currently, there are 12 Potentially Vulnerable Areas (PVAs)
which fall entirely or partially within North Lanarkshire. These PVAs form part of the Clyde
and Lomond Local Flood Risk Management Plan (CaLLFRMP), detailing target areas and
actions over six-year cycles. Of the 12 PVA’s only 7 contain target areas for action within
North Lanarkshire. 
Despite the focus on PVAs within the CaLLFRMP other areas within the council boundary are
at risk of flooding. To gain a better understanding of the risk to all council areas a Strategic
Flood Risk Assessment (SFRA) was developed. The SFRA uses datasets such as SEPA
Flood Maps, regional pluvial maps, and historical flood data to enhance understanding and
resilience. 
The SFRA adopts a ranking methodology to ensure that resources are allocated effectively
to manage the worst affected areas in addition to the 12 actions within the CaLLFRMP. A
proactive approach to flood risk management will be adopted, with reactive interventions as
necessary. 
The SFRA highlighted Kilsyth, Bellshill, and Cumbernauld South with local areas at greatest
risk of fluvial (river) flooding, and Kilsyth, Motherwell North, and Airdrie North with local areas
at greatest risk of surface water flooding. This ranking supports the prioritisation of actions
under the CaLLFRMP. 
Current commissions include the development of surface water management plans for
Motherwell, Cumbernauld, Airdrie and Coatbridge. Flood studies for Motherwell, Airdrie and
Coatbridge, and Bellshill are all due for completion in summer 2024. Progress is being made
on the Kilsyth Flood Risk Reduction Scheme (FRRS) which is at preliminary design stage and
being developed in partnership with Scottish Canals. A surface water management plan for
Kilsyth will be developed in late 2024. 
Item 2
Page 7 of 204

Page 8

1. Background 
1.1  Flooding affects approximately nine thousand properties and businesses within North
Lanarkshire. It causes disruption to residents, businesses, roads and services across
the region, and flood risk is projected to increase with the effect of climate change. 
1.2 The Plan for North Lanarkshire set out a long-term vision for growth and prosperity for
all. Flood risk within North Lanarkshire is considered as part of The Plan and
Sustainable Futures Programme of Work. 
1.3 The National Planning Framework 4 (NPF4) categorises flood risk as where the annual
exceedance probability (AEP) of flooding in a particular area is greater than 0.5% (1 in
200-year event), including an allowance for climate change. This means the probability
of a flood occurring is greater than 0.5% in any one year. 
1.4 The Flood Risk Management Act (2009) sets out a proactive approach to managing
flood risk within Scotland and sets out clear roles and responsibilities in which SEPA,
Scottish Water and Local Authorities are working together. SEPA have a national
responsibility leading on the national flood risk assessments and identification of
potentially vulnerable areas (PVA). Local Authorities have local accountability by
leading on the preparation of local flood risk management plans, which supplement the
national strategies prepared by SEPA, ensuring actions are locally targeted and
delivered. This includes the design and implementation of flood protection schemes. 
1.5 Currently there are 12 PVAs which fall entirely or partially within the Council’s boundary.
PVAs are typically catchment based and can include more than one town. Of the 12
PVAs, seven contain target areas for action within North Lanarkshire. 
1.6 Each PVA forms part of the Clyde and Loch Lomond Local Flood Risk Management
Plan (CaLLFRMP), which sets out target areas and actions to be undertaken by
responsible authorities within six-year cycles. Actions that the Council are responsible
for progressing are given in Appendix 1. 
Recommendations 
It is recommended that the Environment and Climate Change Committee: 
(1)     Acknowledge the contents of this report. 
(2) Endorse the approach taken to prioritise flood risk management actions, such as the
progression of flood risk studies, design and works, to areas at greatest risk of flooding. 
The Plan for North Lanarkshire 
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Sustainable Futures 
Page 8 of 204

Page 9

1.7 To gain a better understanding of the risk to all Council areas a Strategic Flood Risk
Assessment (SFRA) has been developed by the Council. The SFRA uses datasets
such as SEPA Flood Maps, regional pluvial maps, and historical flood data to identify
locations susceptible to flooding throughout North Lanarkshire. Some areas out with
the designated PVAs have been identified by the Council as being at risk of flooding.
These areas have been assessed to improve understanding of flood risk.  The SFRA
adopts a ranking methodology to direct resources for assessing and reducing flood risk
to the worst affected areas. 
1.8 Other duties of the Council under the Flood Risk Management Act include: 
• Inspection and assessment of flood risk associated with open and culverted
watercourses, and 
• where the Council consider that clearance and repair would substantially reduce
flood risk then such clearance would be planned and actioned. 
1.9 The Council will continue to investigate and react to flood incidents within its obligations
and available resources but prioritising action to the worst affected areas, as outlined
in this report, will remain the priority. 
1.10 In addition, the Council is improving the way flood incidents are reported and making
the public aware of their responsibilities and those of other organisations such as
Scottish Water, SEPA, landowners and the general public. The Council website for
reporting issues is being updated to inform users of responsibilities under the Flood
Risk Management Act and give advice to prepare for a flood event. 
2. Report 
2.1 The actions contained in Appendix 1 are primarily to develop flood studies and surface
water management plans to the target areas. The studies and plans are then used to
identify if flood risk alleviation is possible. Optioneering, design, and construction of
flood alleviation schemes will follow provided viability is confirmed and resources are
available. 
2.2 AtkinsRéalis were commissioned to undertake a strategic flood risk assessment
(SFRA) for North Lanarkshire. This assessment considered the flood risk from fluvial
(river) and surface water for a range of events. SEPA classifies flood risk into the
following three categories: 
• High – meaning there is a 10% chance or greater of flooding in a year, referred
to as a 1 in 10-year event. 
• Medium – meaning there is a 0.5% chance or greater of flooding in a year,
referred to as a 1 in 200-year event. 
• Low – meaning there is a 0.1% chance or greater of flooding in a year, referred
to as 1 in 1000-year event. 
2.3 The SFRA considered each Council area and identified those areas where there is a
flood risk using SEPA’s flood maps as the primary dataset. The assessment was based
on the following datasets:
• Scottish Environment Protection Agency (SEPA) Flood Maps V1.3.
• Regional Pluvial & Velocity Maps.
• National Pluvial Maps.
Page 9 of 204

Page 10

• National Flood Risk Assessment.
• National Receptor Database.
• Historical flooding information. 
2.4 The flood maps were overlaid on GIS maps of properties in North Lanarkshire to locate
properties at risk from flooding. Areas for assessment are based on Council ward
boundaries. 
2.5 The assessment areas are ranked based on the number of properties affected by fluvial
and surface water flood risk for the Medium and High likelihood of flooding respectively. 
2.6 The SFRA identified areas within Kilsyth, Coatbridge South and Bellshill to be at the
greatest risk of fluvial flooding, and Kilsyth, Motherwell North and Coatbridge South at
the greatest risk of surface water flooding. The ranking correlates with historic reports
of flooding and the actions identified within the CaLLFRMP. 
2.7 North Lanarkshire areas, ranked by fluvial and surface water flood risk, are given in
Appendix 2 and Appendix 3 respectively. 
2.8 The SFRA will be a ‘live document’ and rankings for all areas will be reviewed by the
Council every six years to coincide with the CaLLFRMP, which is the statutory review
period adopted nationally, or earlier when there is a known notable change to risk, such
as the implementation of flood alleviation measures. 
2.9 The improved understanding of flood risk that the SFRA provides has allowed the
prioritisation of actions under the Flood Risk Management Act resulting in the
production and development of the following studies:
• Airdrie Surface Water Management Plan.
• Airdrie Flood Study.
• Cumbernauld Surface Water Management Plan.
• Bellshill Flood Study.
• Motherwell Flood Study. 
• Motherwell Surface Water Management Plan. 
2.10 The following studies are planned for 2024/25. 
• Allanton Natural Flood Risk Management Study. 
• Kilsyth Surface Water Management Plan.
• Kilsyth Flood Reduction Scheme – Detailed Design. 
2.11 Due to the flood studies and surface water management plans being at relatively early
stages of development, the only project that has currently reached prelim design is the
Kilsyth Flood Risk Reduction Scheme (KFRRS).  Areas within Kilsyth are at the greatest
risk of flooding within North Lanarkshire.  The KFRRS aims to reduce the risk of flooding
from the Ebroch and Garrel Burn by diverting flood water from the Colzium Burn to the
Scottish Canal owned reservoir Banton Loch.  The intention is to progress detailed
design through 2025 and construct during 2026 in partnership with Scottish Canals.   
2.12 Progression from flood studies to design and subsequent construction for other flood
alleviation projects will be prioritised in line with the areas at greatest risk, identified in
Appendix 2 and Appendix 3, and subject to available funding.
Page 10 of 204

Page 11

2.13 It should be noted that Scottish Government funding for construction-ready flood
alleviation schemes to 2028 is fully subscribed, mostly due to overspend from existing
commitments from 2016-2022. However, the Council has budget provision within the
current capital programme to contribute towards the delivery of the KFRRS and
progression of the actions contained in the CaLLFRMP, in Appendix 1. 
2.14 An aligned piece of work is to investigate the possibility of using the detailed information
within the SFRA, flood studies and plans to help developers identify and address any
potential flood risks and inform assessment of planning applications.  For example,
where a developer proposes to discharge surface water to a watercourse with a
downstream flood risk, there is potential for their proposals to incorporate some
betterment through a reduced greenfield equivalent discharge. 
3. Measures of success 
3.1 A reduction of the likelihood or severity of flooding to the worst affected areas within
North Lanarkshire. 
4. Supporting documentation 
Appendix 1 - Clyde and Lomond Local Flood Risk Management Plan Action Summary
Appendix 2 - Fluvial Flood Risk Areas 
Appendix 3 – Surface Water Flood Risk Areas 
Pamela Humpries
Chief Officer (Place) 
Page 11 of 204

Page 12

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Budget is available within the Infrastructure and Transportation capital budget
2024-29 to progress the work identified within this report. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Page 12 of 204

Page 13

Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The report contains a methodology for identifying areas at risk of flooding
throughout North Lanarkshire and for prioritising resources to manage and reduce
flood risk to the worst affected areas.
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
The report contains a methodology for identifying areas at risk of flooding
throughout North Lanarkshire and for prioritising resources to manage and reduce
flood risk to the worst affected areas. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 13 of 204

Page 14

Appendix 1 – Clyde and Loch Lomond Local Flood Risk Management Plan Action
Summary 
Cycle 1
2016 – 2022  Target Area
(to identify localised
flood risk) 
Action  Progress 
Coatbridge and Airdrie Surface Water Plan /Study Completion summer 2024
Cumbernauld Flood Protection Study Delivery during 2025 in
partnership with East
Dunbartonshire Council
Surface Water Plan /Study Completion summer 2024
Kilsyth Flood Protection Study Complete
Holytown Flood Protection Study Complete
Greenacres Flood Protection Study Complete – flood model has
confirmed property should
not flood in a 1:200yr event
Bothwellhaugh Site Protection Plans Complete – flood model has
confirmed property should
not flood in a 1:200yr event
Motherwell Flood Modelling  Complete   
Cycle 2 
2022-2028  Target Area
(to identify localised
flood risk) 
Action    Progress 
Airdrie Surface Water Management Plan In progress
Flood Study   In progress
Kilsyth      Surface Water Management Plan  Delivery 2024/25
Flood Scheme or design works Ongoing
Community Engagement   Ongoing
Flood Study  Complete
Motherwell    Surface Water Management Plan  Complete
Flood Study  Complete
Options Appraisal   Not required
Holytown and New
Stevenson  
Surface Water Management Plan  to be started
Wishaw North  Surface Water Management Plan to be started
Allanton   Flood Study  Awarded   
Cycle 3
2028-2034  Target Area
(to identify localised
flood risk) 
Action    Progress                
Coatbridge    Flood Study   Delivery after 2028
Surface Water Management Plan  Delivery after 2028
Chapelhall   Surface Water Management Plan  Delivery after 2028
Bellshill    Surface Water Management Plan   Delivery after 2028
Flood Study  Ongoing
Cumbernauld East    Surface Water Management Plan  Delivery after 2028
Community Engagement   
Wishaw South   Surface Water Management Plan  Delivery after 2028
Newarthill   Surface Water Management Plan  Delivery after 2028  
Page 14 of 204

Page 15

Appendix 2 – Fluvial (river) flood risk areas 
Areas   Property Count
(1 in 10yr event)
Rank
(1 in 10yr
event) 
Kilsyth  72  1 
Coatbridge South  52  2 
Bellshill  37  3 
Cumbernauld South  32  4 
Airdrie North  31  5 
Fortissat  19  6 
Coatbridge North  12  7 
Airdrie Central  10  8 
Coatbridge West  8  9 
Cumbernauld North  7  10 
Motherwell West  3  =11 
Wishaw  3  =11 
Abronhill, Kildrum and the Village  2  =13 
Airdrie South  2  =13 
Gartcosh, Glenboig and Moodiesburn  2  =13 
Mossend and Holytown  2  =13 
Murdostoun  2  =13 
Motherwell North  1  18 
Motherwell South East and Ravenscraig  0  =19 
Stepps, Chryston and Muirhead  0  =19 
Thorniewood  0  =19 
Page 15 of 204

Page 16

Appendix 3 – Surface water flood risk areas 
Area  Property Count 
(1 in 200yr event)
Rank  
(1 in 200yr event) 
Kilsyth   633  1 
Motherwell North  556  2 
Coatbridge South  512  3 
Abronhill, Kildrum and the Village (Cumbernauld East)  458  4 
Motherwell West  396  5 
Bellshill  373  6 
Airdrie North  365  7 
Thorniewood  364  8 
Mossend and Holytown  349  9 
Motherwell South East and Ravenscraig  343  10 
Coatbridge West  337  11 
Airdrie South  312  12 
Wishaw  295  13 
Gartcosh, Glenboig and Moodiesburn  282  14 
Cumbernauld South  259  15 
Airdrie Central  252  16 
Cumbernauld North  218  17 
Coatbridge North  191  18 
Stepps, Chryston and Muirhead  181  19 
Murdostoun  176  20 
Fortissat  76  21 
Page 16 of 204

Page 17

North Lanarkshire Council
Report
Environment and Climate Change Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref PH/GW  Date 21/08/24 
Update on Parking Enforcement 
From  Pamela Humphries, Chief Officer (Place)  
E-mail woodg@northlan.gov.uk Telephone Gary Wood 07939284954 
1. Background 
1.1 Part 6 of the Transport (Scotland) Act 2019 introduced the statutory framework for a
national ban on pavement parking, double parking and parking at dropped kerbs to
make it easier for local authorities to ensure pavements and roads are safer and more
accessible to all. 
1.2 In 2019 the Scottish Parliament passed the Transport (Scotland) Act 2019 which
included powers to introduce three new parking prohibitions nationally. These ban
parking on pavements, at dropped kerbs at known crossing places, and double parking. 
Executive Summary
The purpose of this report is to provide an update on the progression towards the
commencement of enforcement of new parking regulations, as decided at this Committee
on 7 February 2024, and increased Penalty Charge levies in North Lanarkshire, approved
as part of the budget setting process. 
Recommendations
It is recommended that the Environment and Climate Change Committee: 
(1) Acknowledge the update provided within the report in respect of the implementation
of new parking regulations and increased Penalty Charge levies.
(2) Acknowledge that a further update will be provided to a future committee regarding
the impact of enforcement of the new parking regulations, including any exemptions
to be considered. 
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (17) Ensure we keep our environment clean, safe, and attractive
Programme of Work Transforming Places
Item 3
Page 17 of 204

Page 18

1.3 All secondary legislation has been put in place to give local authorities the powers they
require to enforce these new parking offences. The Parking Prohibitions (Enforcement
and Accounts) (Scotland) (Regulations) 2023 were enacted on 11 December 2023,
which provides local authorities with the powers to enforce the new parking prohibitions.  
The penalty charge level is set at £100, although this reduces to £50 if paid within 14
days. 
1.4 Some exemptions apply to the new parking offences, which include: 
• To allow for the normal operation of the emergency services, or medical
practitioners in emergency situations.
• To allow the response to an emergency or accident.
• To allow for certain deliveries and collections.
• Vehicles used for undertaking works on roads or removal of obstructions. 
1.5 These exceptions are only valid if specific criteria are met and there is no other
reasonable parking available. Local Authorities in Scotland have powers to exempt
certain areas of pavement, should they feel it necessary. In general, local authorities
can consider an exemption where one of two criteria are met, where:
• Its layout or character would allow for a width of 1.5 metres of the footway to remain
unobstructed when any part of a vehicle is parked on it, or
• The layout or character of the carriageway associated with the footway is such
that the passage of an emergency vehicle would be impeded by the presence of
a vehicle parked on the carriageway. 
1.6 Where an exemption is put in place, the area subject to the exemption must be clearly
signed and marked so that members of the public understand that they are allowed to
park on that area of pavement.   
1.7 On 7 February 2024, the Council’s Environment and Climate Change Committee
approved a report to commence towards the enforcement of pavement parking, double
parking and parking at dropped kerbs. It was agreed that a report outlining the progress
in this regard be brought back to this Committee in Cycle 3. 
1.8 It should also be noted that as part of the Council’s budget setting process, it was
agreed to increase existing Penalty Charge Notice penalties to £100, reducing to
£50 if paid within 14 days, which is consistent with the penalties mandated for the
new parking offences. 
2. Report 
2.1 Since receiving approval from this Committee to progress towards enforcement, the
immediate focus has been on developing the back-office systems, as well as
commencing recruitment to employ additional technical and frontline enforcement staff. 
2.2 As outlined in the previous report, a collaborative working agreement is in place with
Glasgow City Council to provide back-office support for the Council’s parking
enforcement service. Glasgow City Council also have a similar collaboration with East
Renfrewshire Council and East Dunbartonshire Council.    
Page 18 of 204

Page 19

2.3 Changes to the back-office systems are required for both the enforcement of the new
parking offences and the increase in Penalty Charge to £100/£50. The local authorities
involved in the collaboration are reliant on the same back-office systems. To
accommodate the changes required, it is necessary for all authorities to undertake
robust testing of handheld devices, IT servers, payment systems, etc. within the same
timeframe.   
2.4 The testing environment to increase the Penalty Charge to £100/£50 is almost
complete. It is anticipated that this will be implemented by September 2024. The
Council has a duty to advertise the change in penalty charge, and it is intended to
publicise this via local press adverts, the Council’s website and social media channels. 
2.5 Regarding enforcement of pavement parking, and the other new parking offences, the
timescale for implementation has been delayed.  This is mainly due to the delay in
commencing back-office testing, which requires third party IT support who have had
capacity issues which has impacted on their ability to undertake the work within the
expected timescales. 
2.6 It was previously reported that before the Council can commence enforcement, it would
be necessary to provide additional training to staff.  Additionally, it was previously
agreed as part of the Council’s budget setting process to expand the parking team with
additional technical and frontline enforcement staff.  This recruitment exercise is
currently ongoing, with two new parking attendants in post so far. 
2.7 Taking the outstanding back-office system works into consideration, along with the
progress in recruitment, it is currently estimated that the enforcement of the new parking
offences will commence towards the end of 2024, although every effort is being made
to accelerate this timescale. 
2.8 It was outlined to Committee on 7 February 2024 that in preparation for the introduction
of these new parking offences, the Council has assessed the entire public road network
within North Lanarkshire to determine whether exemptions should apply.  As the vast
majority of pavement parking is occurring where there is existing on-street provision or
private driveways, it is considered that no Exemption Orders are required at this time. 
Instead, it is proposed to undertake an operational review within the first year of
enforcement to determine whether any Exemption Orders are appropriate. 
2.9 Prior to enforcement commencing in this regard, the Council will run a complementary
communications campaign aligned with the national approach, which will commence
four weeks prior to the implementation date.  In addition, to raise awareness of these
new prohibitions, the intention is to initially undertake a soft approach for the first four
weeks of enforcement, by affixing warning notices to offending vehicles. Thereafter,
Penalty Charge Notices will be issued. 
2.10 As reported to this Committee on 7 February 2024, it will be necessary to prioritise how
enforcement resources are deployed to target locations with a greater road safety risk
to pedestrians or other road users as a result of pavement and double parking.   This
would typically be in areas with high traffic volumes and high pedestrian movements. 
3. Measures of success 
3.1  Through greater enforcement of pavement parking, there will be improved accessibility
in our town centres and communities.     
Page 19 of 204

Page 20

4. Supporting documentation 
No supporting documents.   
Pamela Humphries
Chief Officer (Place) 
Page 20 of 204

Page 21

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact?
Positive impacts – greater accessibility in town centres and communities. EqIA
prepared
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☒ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Whilst there may be an increase in Penalty Charge Notice (PCN) income resulting
from the enforcement of the new parking offences, the value is difficult to forecast.   It
should be noted the main objective of parking enforcement is not to raise income but
to encourage safe and responsible road use.  The Regulations expect that any surplus
is utilised to facilitate the Council’s local transport strategy and / or to support the
costs of maintaining off-street parking. The increased income resulting from the
increase to £100 PCN’s was included within the 2024/25 budget setting process.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☒ No ☐
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
If any Exemption Orders are retrospectively considered, this will be discussed with
Legal and Democratic Services and appropriate legal advice obtained.
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐ Page 21 of 204

Page 22

5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact?
The development of the back-office systems, required to facilitate the enforcement of
the new parking offences and £100/£50 PCN’s, required input from the Council’s
Business and technology team. 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact?
There will be a requirement raise awareness via Corporate Communications in
advance of the enforcement of pavement parking etc.
5.9 Risk impact
Is there a risk impact?
Yes ☐ No ☒
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service or
Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-Service
personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the Armed
Forces community to make sure that they do not face disadvantage compared to other
citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the age
of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles from
the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 22 of 204

Page 23

North Lanarkshire Council
Report
Environment and Climate Change Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    LR/VA/CM Date 21/08/24 
Sustainable Futures - Burial Space Strategy and Cemeteries
Creation Projects 
From  Chief Officer (Community Operations)  
E-mail Renniely@northlan.gov.uk Telephone 07855 193500 
Executive Summary 
This report provides committee with an update on burial space needs within North
Lanarkshire and actions proposed to provide sufficient new burial space for each community. 
All currently available burial space within North Lanarkshire, with the exception of Eastfield
Muslim burial area, is projected to be utilised within approximately 10 years, highlighting the
importance of prioritising ongoing burial space development projects.
This report provides detailed information on progress to provide additional lairs for
communities using Cambusnethan and Coltswood cemeteries, which both have run out dates
forecast in the next few years. 
The report also updates committee on improvement projects undertaken during the last year
across active cemeteries.
Recommendations
It is recommended that the Environment and Climate Change Committee: 
(1) Approves the service proposal to seek alternative sites for a replacement cemetery
in Coatbridge as a matter of urgency 
(2) Agrees modifications to the design of the proposed new cemetery Pather Farm,
required by peer review of planning permission conditions.  
(3) Recognises the future impact of other run out dates presented in the Burial space
strategy and 
(4) Approves the service proposal that future new cemetery creation projects are
prioritised based on burial space run out dates and site suitability, with the aim of
meeting the council’s commitment to reduce funeral poverty by providing burial
space in each local area,  
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (17) Ensure we keep our environment clean, safe, and attractive
Item 4
Page 23 of 204

Page 24

1. Background 
1.2 The main options for increasing burial space, in order of decreasing cost effectiveness
are: 
• Development of unused or under-used areas within existing cemeteries 
• Extension of existing cemeteries or creation of a nearby ‘satellite’ site if no suitable
adjacent land exists for extension
• Development of new cemeteries. 
1.3 Cambusnethan and Coltswood cemeteries are currently projected to run out of burial
space in 2026, and Cambusnethan Muslim burial area is projected to run out of space
in 2027. Plans are in development for small internal extensions in each of these, in
conjunction with the continued development new cemetery projects outlined below.
This will ensure continuity of local burial space.
1.4 Pather Farm New Cemetery has been in development since 2019 and when developed
to full capacity will provide over 2000 lairs. 
1.5 Bedlay Cemetery is already closed for new lairs, an extension is only possible subject
to a section 75 agreement progressing with an adjacent proposed housing
development.   
1.6 A report to committee in Sept 2023 detailed improvements undertaken in existing
cemeteries during 2023 and outlined those in the pipeline for the coming year.  An
update on these is provided. 
2. Report 
Burial Space Strategy 
2.1  Appendix 1 shows the currently available new lair provision across North Lanarkshire.
Without the development of additional burial space, Cambusnethan and Coltswood
cemeteries will run out of space within two years, and all cemeteries currently offering
new lairs will run out within approximately 10 years. 
2.2 A cross service Cemeteries Projects Team is in place to identify, investigate, design,
procure and build new burial spaces. Projects they are currently working on are
summarised below. 
2.3 Cambusnethan cemetery has a small area to the east of existing burial space with
capacity for approximately 300 lairs. Site investigation is underway to determine the
suitability of this space which would provide over 3 years additional capacity and aid
with the transition to the new cemetery at Pather Farm.
Programme of Work Statutory / corporate / service requirement
1.1 There are currently fifteen operational cemeteries in North Lanarkshire, seven of which
offer new lairs. The Burial Space Strategy monitors annual changes in lair capacity at
each cemetery allowing the council to plan ahead with the aim of providing sufficient
space before capacity runs out. Run out dates by cemetery are provided in Appendix
1.  
Page 24 of 204

Page 25

2.4 Capacity for approximately 200 lairs exists within the existing Muslim burial area at
Cambusnethan cemetery, which requires the development of paths and headstone
foundations.   
2.5 As approved by committee in 2023 the service has explored creation of additional burial
space within the existing Coltswood cemetery. The works have been phased over 2
years, with approx. 250 lairs to be created in phase 1 and over 500 in phase 2. Phase
1 will provide more than 2 years additional capacity, and phase 2 could provide a further
4 years. 
2.6 Site investigation has been underway at New Monkland cemetery for several years,
and a provisional design has been drafted which could provide around 1500 lairs. The
project will now progress to a detailed design stage with the aim of applying for planning
permission during 2025. 
2.7 Identification of suitable extension sites is underway at Eastfield and Kilsyth
cemeteries, which are the next approaching run-out dates. 
Coatbridge - Morven Street extension to Coltswood Cemetery 
2.8 In March 2022 the Finance and Resources Committee approved the development of
an extension to Coltswood Cemetery into the only available adjacent land, disused
sports pitches at Morven Street. Initial assessment of the land had concluded the land
could be suitable for burial space. 
2.9 In depth site investigations were carried out by specialists over the course of a full year,
as SEPA stage 2 investigation requires 12 months of water level monitoring. The
council have now received a report analysing the results and this recommends that the
site is not suitable for burial space for the following reasons: 
2.10 The SEPA guidance note indicates that burials below the water table will not be
permitted in any circumstance and that at least a metre of soil has to be present above
the level of any burial. Groundwater seepages were recorded within four of the trial pit
excavations which took place at Morven Street, at depths of between 0.70m and 2.00m
below ground level, with further seepages recorded at ground level within two other
locations. Groundwater level monitoring carried out within installed boreholes indicated
median groundwater levels of between 0.47m and 3.76m below ground level. The full
year of monitoring suggests the presence of a shallow water table, and burials would
therefore be beneath the water table across much of the site, which is not permitted in
any circumstances. 
2.11 In addition SEPA guidance indicates that no coarse sand and gravel can be present 
within burial excavations. Particle size distribution (PSD) tests were carried out on both
the granular and cohesive made ground and natural glacial till to determine the
proportions of the individual soil constituents, both the made ground and natural soils
comprise a high proportion of courses grained materials meaning the site is also likely
to be rejected by SEPA based on their criteria for land suitable for burial space.
2.12 Samples of made ground and glacial till have been subjected to laboratory analysis for
a range of typical contaminants. Asbestos has been detected within the made ground
across the site, and this poses a risk to human health, particularly to personnel
employed to dig graves. The potential for generation of marginally elevated
concentrations of zinc, petroleum compounds and organic leachates has been
Page 25 of 204

Page 26

identified and groundwater analysis has shown that these are having an impact on
shallow groundwater across the site.  In addition, nitrate and ammoniacal nitrogen
concentrations within the groundwater were particularly high, suggesting that the
adjacent land use could be having an impact on groundwater quality already. Further
development may exacerbate this and is not recommended.
2.13 Numerous obstructions were recorded within the made ground, this represents a further
constraint to the use of the site for burials as graves could not be dug where large sub
surface obstructions are present, but this would not be known until a lair was used for
the first time.
2.14 New roads constructed as part of the proposed cemetery would require a full capping
layer, due to the presence of made ground at formation level across most of the site.
This would generate additional costs for any development of the site not just Cemetery
use.
2.15  Raising the ground level was considered but this is extremely unlikely to be structurally
possible due to the gradients on site and the potential risk to the neighbouring housing
development downslope. If it were technically achievable the costs would be out of
proportion with the number of lairs which could be created.
2.16 As a consequence of these results Property Services have already begun the process
of identifying and investigating alternative sites for cemetery creation within Coatbridge.
Wishaw - Pather New Cemetery Creation 
2.17 Pather Farm has been in development as a standalone new cemetery for Wishaw since
2018. The site could provide well over 2000 burials spaces with 978 forecast in the first
phase. 
2.18 The full project extends the burial space run out date in Wishaw and also provides
capacity to meet the requirements of other adjacent local areas if required. The first
phase alone meets the forecasted requirement of burial space for the Wishaw
community for at least a decade. 
2.19 The construction contract for phase 1 of the cemetery creation was tendered in Jan
2024 and the price returned was £3,746,762.97. Following Peer Review of the site
investigation information submitted as part of the Planning Application modifications
relating to grouting boreholes, capping landscaped areas, treating asbestos containing
materials (ACM’s) and minor changes to the building warrant are required. These
modifications will be covered by provisional sums already included within the contract
and do not alter the separate contingency sum of £200k for the project. 
2.20 Approval for contract award was approved by this committee in Feb 2024. The Contract
was awarded on the 4th June 2024 by the Chief Officer of Asset and Procurement
Solutions. Work on site will start in August 2024 and take until May 2025 to complete.
Cemetery Improvement Projects 
2.21 Since the last report in September 2023 the following improvement works have been
completed:
• Drainage works at Old Monkland cemetery.
• Additional drainage works at St Patricks cemetery.
• Foundation works at Bothwellhaugh section D.
Page 26 of 204

Page 27

• Footpath and drainage improvements at Cambusnethan cemetery
• Refurbishment of the Baby Garden at Cambusnethan cemetery 
2.22 The refurbishment of the baby garden was undertaken in consultation with local charity
Baby Loss Retreat, who were invaluable in providing guidance and an interface with
bereaved families.  The service is now looking to undertake a similar project at
Bothwellpark baby garden as resources allow.
2.23 A pilot project has been undertaken in Old Monkland cemetery to replace cemetery
bins with larger bins in casings and reviewing locations.  This has improved the
cemeteries environment, reduced manual handling associated with the old-style bins
and increased capacity.  Following the success of this pilot the service will work with
Waste services to roll this out across further cemeteries, as resources allow. 
3. Measures of success 
3.1 Sufficient burial space to meet the council’s statutory obligation to bury the dead.
3.2 Enough burial space in each locality to ensure funeral poverty is minimised.
3.3 Cemetery expansion/ Creation Projects developed as economically as possible. 
4. Supporting documentation 
Appendix 1 – Burial Space run out dates by cemetery. 
Lyall Rennie
Chief Officer (Community Operations) 
Page 27 of 204

Page 28

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
This report covers the award of a contract of significant value which is covered by
the current capital programme 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Page 28 of 204

Page 29

Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Environmental impacts of the proposed Coltswood extension have been identified
and an alternative site is being explored
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Boards will be kept informed of progress to identify a revised cemetery site for
Coatbridge
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Risks associated with each individual project referenced in the report are managed
through the risk register for each project as part of the council’s standard project
management process.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 29 of 204

Page 30

Appendix 1 – Burial Space run-out dates by Cemetery 
Cemetery Area served Runout
Date of
Developed
Lairs (April
2024)
Runout
Date of
Lairs
being
Developed
During
2024/25
Potential
Additional
Life Span
Runout
Date of
Developed
Lairs +
Potential
lairs
Bedlay
Cemetery
Northern
Corridor
closed at
present time
for new lairs
- Extension
being
developed,
subject to
section 75
agreement
with
developer,
currently
redirecting
burials to
other
cemeteries
Approx 20
years
capacity,
once
developed
Pather Farm
Cemetery
Wishaw and
surrounding
area
in
development
- Procurement
underway for
construction
to commence
in 2024 and
completion in
2025
Approx 12
years
capacity in
Phase 1,
once
developed
Cambusnethan
Cemetery
Wishaw and
surrounding
area
Apr-2026 - Site
investigation
underway for
small
extension to
east of
existing
cemetery
Feb-2030
Coltswood
Road
Cemetery
Coatbridge
and
surrounding
area
May-2026 Jul-2028 Extension
through
development
of fields to
west
unfeasible.
Opportunity
to expand
capacity of
existing
cemetery
area by
removing
trees and
landscaping.
Jan-2033
Page 30 of 204

Page 31

Cambusnethan
Cemetery
Muslim Burial
Space
Southern
area
Apr-2027 - Further
development
of remaining
Muslim area
Oct-2040
Eastfield
Cemetery
Cumbernauld
and
surrounding
area
Aug-2029 - Area to east,
requires
geotechnical
investigation
Dec-2061
New Monkland
Cemetery
Airdrie and
surrounding
area
Jan-2031 - Area to north Dec-2050
Kilsyth
Cemetery
Kilsyth and
surrounding
area
Aug-2032 - Development
of lairs along
northern wall
of existing
cemetery.
Mar-2037
Bothwellhaugh
Cemetery
Motherwell,
Bellshill and
surrounding
area
Aug-2033 - Phased
development
within
cemetery
boundaries
Apr-2048
Benhar
Cemetery
Shotts and
surrounding
area
Nov-2034 - Potential
extension
into council-
owned land
to north
Jul-2084
Eastfield
Cemetery
Muslim Burial
Space
Northern
area
Jan-2117 - Potential to
include in
wider
cemetery
extension
above
Jan-2117 
Page 31 of 204

Page 32

Page 32 of 204

Page 33

North Lanarkshire Council
Report
Environment and Climate Change Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    LR/VA/CM Date 21/08/24 
Sustainable Futures - Country Parks for the Future Update 
From  Lyall Rennie, Chief Officer (Community Operations)  
E-mail Renniely@northlan.gov.uk Telephone 07855 193500 
Executive Summary 
This report is an annual update to the committee on delivery of Country Parks for the Future
projects which contribute to both Sustainable Futures and Transforming Places
Programme of Work. 
The report provides information on two large projects which are in development and early
delivery; the net-zero led redevelopment of Strathclyde Country Park Watersports Centre
into a Green Health Hub, and the community co-delivery of a heritage focussed program
of improvements at Palacerigg Country Park. 
The report also provides a progress update on other pipeline projects approved by
committee in August 2023, including the Blair Road gateway works at Drumpellier Country
Park and the Remembering Together Covid-19 memorial for North Lanarkshire at
Strathclyde Country Park. 
Recommendations
It is recommended that the Environment and Climate Change Committee: 
(1) Recognise the continued progress made in delivering Country Parks for the Future
and the contribution this makes to our programme of work ambitions, particularly
around Sustainable Futures and Transforming Places. 
(2) Considers the significant community and placemaking benefits that will arise from
the redevelopment of the Watersports Centre and the commitment of staff time and
resources required to successfully deliver the project. 
(3) Authorise the Chief Officer (Legal and Democratic) in conjunction with the Chief
Officer (Community Operations) to progress the award of the contract for the
redevelopment of the Watersports Centre, circa £14 million, following completion of
the procurement process undertaken with Hub South West as outlined in section 2.7
in the main report below. 
(4) Considers the large-scale heritage themed project in development at Palacerigg and
endorse the approach to continuing to seek external funding support to deliver health
and wellbeing benefits for the community of Cumbernauld. 
Item 5
Page 33 of 204

Page 34

1. Background 
1.1 This report updates committee on progress with delivering Country Parks for the Future
since the update to this committee in August 2023, at which the committee approved
the project pipeline. 
1.2 The pipeline included:
• Detailed development work, and fundraising, for heritage and play themed
improvements to Palacerigg Country Park.
• Delivery of the community co-designed Remembering Together Covid-19
memorial.
• Net-zero led redevelopment of the Watersports Centre at Strathclyde Country Park.
• Artist in Residence/ Art Park projects. 
1.3 A previous report to the committee in February 2023 updated committee on the Green
Growth Accelerator pathfinder project which developed proposals to upgrade the
Watersports Centre and reduce its carbon emissions.   
1.4 The Strathclyde Country Park Watersports Centre Redevelopment is based on
research work started in 2017 as part of the national Park Power research project. This
identified that Strathclyde Loch had enormous heat potential which could provide
renewable heat for Strathclyde Park and surrounding neighbourhoods. 
1.5  Capitalising on the findings from the research project, the greenspace projects team
applied to become one of the Scottish Governments Green Growth Accelerator
Pathfinder Projects. The Green Growth Accelerator (GGA) fund was designed to
catalyse the adoption of renewable energy options in the public sector. A revenue grant
of £120k enabled the council to prepare a business case for the net-zero led
redevelopment of the Watersports Centre into a Green Health Hub. The Green Growth
Accelerator funding was suspended for all projects by the Scottish Government in Nov
2023.  This report updates committee on progress in securing new funding to take
forward delivery of the project. 
1.6 Drumpellier Country Park has been part of the Seven Lochs Wetland Park project for
the last 5 years and has seen a range of improvements take place, including the
Crannog play area and the new interpretive display in the Visitor Centre. Adding to this
work in 2023 the project team planned improvements to the Gateway into the park from
Blair Road. An update on delivery of these is provided in the report. 
1.7 All these projects contribute to the Sustainable Futures theme of the council’s
Programme of Work. The net zero led transformation of the Watersports Centre into a
health and education hub is a key deliverable for the programme. Under the theme of
Climate Adaptation, the Country Parks for the Future program is also a key deliverable
aiming to make country parks significant assets for communities, enabling active
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement
(16) Transform our natural environment to support wellbeing and
inward investment and enhance it for current and future
generations
Programme of Work Sustainable Futures
Page 34 of 204

Page 35

greenspace use and engaged community involvement which brings improvements for
health, wellbeing and other social outcomes. 
1.8 The Transforming Places Program of Work recognises that the council needs to invest
in cultural and heritage assets to increase community pride and awareness of local
heritage, which makes North Lanarkshire an attractive visitor destination, and commits
to working with a range of local community groups to celebrate heritage. 
2. Report 
Strathclyde Country Park Masterplan Delivery 
Watersports Centre Redevelopment 
2.1 £2.3 million of external funding from the Public Sector Heat Decarbonisation Fund
(Scottish Government) has been secured for the net-zero led redevelopment of the
Watersports Centre, tied to reduction of carbon emissions. Delivery of the project will
help the council commitment to reach net zero by 2030 by reducing the energy demand
of the building by around 90%. 
2.2 This reduction is achieved through two key measures. Firstly, the heated parts of the
building will be grouped together and heavily insulated, this reduces the heat demand
of the building. Secondly a renewable heat source will be fitted to the building. The
current design is based on a closed loop water source heart pump which could be
installed in the loch, complemented by a Photo voltaic (PV) array on the roof, these
renewable sources provide (averaged over a year) a significant proportion of the energy
demand of the refurbished building. 
2.3 As well as helping mitigate climate change the project will also transform the building
to make it fit for modern needs. The 1970’s Watersports centre building will widen its
focus to become a green health hub for the whole community. There are four key areas
of change: 
2.3.1 The current café is on the first floor and this will be moved down to the ground            
floor benefiting from a mixed indoor-outdoor seating area and a refreshed            
catering offer. Being highly visible and accessible will encourage new            
customers into the building, boosting economic activity and engagement with 
green health provision. 
2.3.2 By creating flexible spaces which can be hired and leased on different days for            
different activities the Green Health Hub will be able to host a range of wellbeing 
activities, complemented by breastfeeding friendly areas, fully accessible
Changing Places facilities and a warm customer welcome based on trauma
informed design principles. This ensures all of our residents have the fullest
opportunities to improve their physical and mental health. 
2.3.3 Encouraging use of the park and facilities by our young people is extremely 
important. The park is the home of the council’s P7 Outdoor Education program
and Edinburgh University Rowing Club and this project will enhance the existing
bespoke outdoor education areas within the building and create a new crew
room and office space for Edinburgh University. Edinburgh University are also
leasing space adjacent to the building to create their own boat store. 
Partnership with the University and Scottish Rowing is leading to a wider range
of pathways to encourage local young people into the sport and to access the
Page 35 of 204

Page 36

unique international standard facility on their doorstep. A further update on local
pathway provision will be reported to a future meeting of the committee. 
2.3.4 Temporary buildings in the car park of the current Watersports Centre host
arboricultural services, access staff, countryside rangers and other greenspace
staff. These spaces are reaching the end of their lifespan. This project will
create a bespoke arboricultural base separate from the Watersports Centre.
The remaining staff in the current temporary building will be moved into new
office accommodation created by extending out onto the first-floor terrace of the
current Watersports Centre building. The new offices have been designed to
meet the new 50:50 hybrid working pattern and are based on hot desking
principles with breakout pods, meeting rooms and audio pods to create space
for efficient in person collaboration and online working for mixed teams. 
2.4 The Scottish Government took a decision in November 2023  to discontinue their Green
Growth Accelerator capital grants program. Given the compelling research and
business case already established, Greenspace projects team has now secured the
necessary budget to progress this transformative carbon reduction NL project from the
following sources. 
• NLC 2024-2029 Capital Program - £9million
• Public Sector Heat Decarbonisation Fund (PSHDF) - £2.3million 
• Country Parks for the Future budget - £1.5million
• Place Based investment Program - £950k (subject to SG confirming allocation for
new financial year)
• Shared Prosperity Fund - £400k (subject to SG allocation for new financial year) 
2.5 A Contract Strategy has been prepared and approved for this procurement. The
professional services required to deliver the project have so far been commissioned
through Hub South West, and the project team intend to continue to use that route. 
2.6 The project is currently forecast to take 2 years to complete. The first phase of the
project will see the terrace extension and insulation works carried out. These must be
progressed by March 2025 in order to comply with the conditions of the PSHDF grant.
The second phase of the project will involve installing the renewable energy solutions
and completing the internal alterations and finishes required to reopen to the public. 
2.7 In order to keep pace with the tight timeline for the project we intend awarding the
construction contract by October 2024. This will take place using the established Hub
SW procurement route. An indicative timeline for the works will be available in autumn
2024, from the main contractor, once design works are complete. Given the timescales
associated with the project and potential funding implications, it is recommended the
Committee authorises the Chief Officer (Legal and Democratic) in conjunction with the
Chief Officer (Community Operations) to progress the award of the contract for the
Redevelopment of the Watersports Centre of circa £14 million following completion of
the procurement process undertaken with Hub South West. If approved, a report
providing more detail of the procurement process and its outcomes shall be reported
to the next available committee meeting. 
2.8 The main risks associated with the project are associated with meeting the timescales
for spending external grants and ensuring the carbon reduction targets are met.
Emissions will be monitored to check performance once the building is reopened. In
order to mitigate the risks, sufficient staff capacity across all specialities must be
Page 36 of 204

Page 37

committed to the project. A project board is in place to manage these risks and reports
to the Sustainable Futures board. 
2.9 The project forms part of a suite of complementary projects across the park which over
time will build up to create a high quality recreational, educational and tourism resource
meeting the needs of the population of North Lanarkshire. Continued commitment to
the holistic Country Parks for the Future vision will be required to achieve this.
2.10 Since the last report to this committee in August 2023 there has also been progress in
in delivering the following smaller projects from the approved pipeline: 
2.11 The Gathering Space, North Lanarkshire’s community co-created Covid-19 Memorial
art project, which finished in July 2024. This work was part of a Scotland wide
government funded project to create a Covid-19 memorial in each local authority area.
The process of co-creation was reported to this committee in August 2023. The finished
installation takes the form of a circular plaza with tiered seating around part of the
circumference, decorated by art panels and coloured inserts to the paving. In spring
2024 representatives from each local area planted a tree to provide a green backdrop
to the memorial and residents have also helped sow wildflower seeds. The Gathering
Space has a peaceful view of the loch and is easily accessed from the Beach carpark
which has also just been resurfaced and relined. 
2.12 During 2023 an Artist in Residence Program took place in the park which resulted in
the upgrading of the picnic pavilions and the conversion of the old Starters Portakabin
into an Art bothy. Sculptures have also been commissioned to highlight the Mega Flora
wildflower areas which have been created to connect nature in the park and
surrounding grassland. The sculptures complement the existing interpretive panels
which explain the multiple benefits of more nature-based grassland management.
Strathclyde Country Park will also host Active and Creative Communities Travelling
Gallery on the 10th of July 2024 and have contributed to North Lanarkshire’s new Art
Strategy. 
2.13 A new interactive travel map (Interactive map for Strathclyde Country Park | North
Lanarkshire Council) complements access upgrades which have created important
links on recreational and commuting routes through the park. 
Palacerigg Country Park Masterplan Delivery 
2.14 Big changes are planned for Cumbernauld through the Town Centre vision, enabled
by the council’s acquisition of the shopping centre, and the progression in delivery of
two large Community Growth Areas immediately adjacent to Palacerigg Country Park
which will bring thousands of new residents to the park doorstep. Forward planning is
needed to prepare the park for this additional pressure and ensure the health and
wellbeing needs of Cumbernauld residents are met through a regional country park
attraction. 
2.15 As reported to this committee in August 2023, work to deliver the Masterplan at
Palacerigg centres around the three key aims for the park, determined in consultation
with the residents of Cumbernauld, which were Access, Community and Play. 
2.16 Over the past year community organisations involved in the site (Palacerigg Community
Trust and Watch us Grow) have worked alongside the Greenspace Projects Team,
other stakeholders on site, council departments delivering services in the park, and the
wider community to prepare funding bids for Masterplan projects and the Playful
Landscape Plan for Palacerigg Country Park.  The Palacerigg Community Trust have
Page 37 of 204

Page 38

an active Community Asset Transfer request under consideration to run community
based services from the visitor centre and some associated buildings and fields. 
2.17 The largest of the funding bids is an application to the National Lottery Heritage Fund,
submitted in February 2024. Feedback on the development year plan was received in
June 2024 requesting some alterations and additional information.  This is currently
being gathered and an updated proposal will be submitted in November 2024 (with a
decision expected early 2025). A second bid to NHLF for capital funds to deliver the
plans would then be applied for to deliver change over a 3 year period. 
2.18 If the funding is provided by NLHF it will secure around 60% of the funds required to: 
• Improve the energy efficiency of the community use buildings in order to reduce
running costs and carbon emissions. 
• Restore existing features and create ‘destination’ level attractions in the park linked
to the creative, social and natural heritage of the site. 
• Improve visitor facilities such as signage, wayfinding, active travel routes
connecting to communities and car parking. 
• Provide opportunities for local people to be involved in the program of activity and
gain skills and experiences as a result which improve their lives. 
• Run events and activities for the whole community attracting a wider range of
visitors to the park, improving their health and wellbeing while showcasing the
important heritage of the park. 
2.19  Additional fundraising will be required to resource the remaining 40% of the project
budget. A variety of possible sources have been identified and work is starting with the
community organisations to prepare and submit applications where funding deadlines
are imminent.  Part of the bid is funding for a temporary Project Officer and Project
Assistant dedicated to development for the first year with the possibility to extend their
contracts for a further 3 years if delivery funding was secured. 
2.20 The anticipated value of the full program is circa £5million. The value of the submitted
NLHF application is circa £3million. 
Drumpellier Country Park 
2.21 Since the report to this committee in August 2023, the planned upgrades to the Blair
Road entrance to Drumpellier Country Park have been completed. These include a new
hard surfaced car park with demarcated blue badge bays, a Nature Connector Route
which leads from Blair Road to the Visitor Centre, and a new interactive App for the
park. This suite of improvements ensures residents at the eastern edge of the park
receive improved health and wellbeing access to the full suite of facilities available at
Drumpellier Country Park, gateway to the Seven Lochs. 
2.22 The Nature Connector Route has been funded in part through Scottish Government
Nature Recovery funding, and combines environmental improvements such as invasive
species removal, tree planting, wildflower meadow establishment and pond creation.
These improvements are highlighted for public education/ enjoyment through eye-
catching features such as carved wooden bee posts, metal hibernacula with art panels,
tree rubbing posts and interpretive panels with wildlife information. They will be
Page 38 of 204

Page 39

complemented with wildlife cameras later in the year uncovering the secret lives of
different creatures, like owls and otters, who make their homes in Drumpellier Country
Park. 
2.23 An interactive App for Drumpellier is being delivered with support from the Shared
Prosperity Fund. The launch was timed to coincide with the start of the school summer
holidays and encourages local families and tourists to spend longer exploring the
Country Park. The app is free for customers to use and features three routes around
the park. As visitors travel around the park the app keeps them on the right track, and
at pre-determined points brings up information and questions from a fun quiz for them
to try and answer. There are also features like augmented reality masks which enable
the user to create quirky ‘selfies’ of themselves as unusual animals. Engagement with
the app content will be monitored over the next year to test whether a broader roll out
of smart phone app content could encourage increased use of greenspaces in North
Lanarkshire. 
3. Measures of success 
3.1  90% reduction in carbon emissions associated with the current Watersports Centre
Building in Strathclyde Country Park 
3.2  Removal of 1 temporary building and restoration of 1 building at Strathclyde Country
Park. 
3.3 Enhanced health and wellbeing facilities attract 20% increase in visitors to both
Strathclyde and Palacerigg Country Parks 
4. Supporting documentation 
No support documents. 
Lyall Rennie
Chief Officer (Community Operations) 
Page 39 of 204

Page 40

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Both projects will enhance accessibility and positively contribute to delivering
services in a more equitable way. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
If the external funding bids are successful NLC will need to find a minimum
applicant contribution towards the Palacerigg project as well as sourcing additional
external grants to complete the full budget. This will be discussed with finance once
the main funding situation is clarified. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Page 40 of 204

Page 41

Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
All projects contain works which help contribute to our aim to be net zero by 2030.
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The good news stories associated with all projects should be communicated to the
public and NLC Comms staff are developing a planned program of coverage. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed?
There are expected financial, reputational and resourcing risks associated with any
externally grant aided program of activity and these are detailed in the risk registers
for each individual project. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC).
Page 41 of 204

Page 42

The WSC contains provision for the p& Outdoor Activity program and this is aimed
at young people below 18. Detailed stakeholder engagement is in place to ensure
the project provides positive improvements for these young people. 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒ 
Page 42 of 204

Page 43

North Lanarkshire Council
Report
Environment and Climate Change Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    LR/JA Date 21/08/24 
Winter Service Policy and Procedures 2024/25 
From  Lyall Rennie, Chief Officer (Community Operations)  
E-mail renniely@northlan.gov.uk Telephone 07855 193500 
1. Background 
1.1 Under Section 34 of the Roads (Scotland) Act, 1984, North Lanarkshire Council has a
statutory obligation to take such steps as it considers reasonable to prevent snow and
ice endangering the safe passage of pedestrians and vehicles over their public roads
which by definition includes carriageways, footways and footpaths. 
1.2 This does not mean that all roads and footways must be treated as soon as ice
formations or snow accumulations exist. To do so would be impossible and out with the
Executive Summary 
This report presents Elected Members with details of the proposed Winter Service Policy
and Procedures for 2024/25.  The council has an obligation under the Roads (Scotland)
Act 1984 to take such steps as it considers reasonable to prevent snow and ice
endangering safe passage of pedestrians and vehicles over public roads. This obligation
is discharged through the council’s term maintenance contractor. To ensure that these
obligations are met the council is required to annually review its processes and procedures
and approve an annual refresh of its policy. 
Recommendations
It is recommended that the Environment and Climate Change Committee: 
(1) Considers the contents of this report and accompanying appendix.
(2) Agrees the proposed Winter Service Policy and Procedures 2024/25 as the base
for winter service delivery in the coming year.
(3) Agrees that a future report be submitted regarding grit bin provision and use prior to
the 2025/26 winter period. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (17) Ensure we keep our environment clean, safe, and attractive
Programme of Work Statutory / corporate / service requirement
Item 6
Page 43 of 204

Page 44

limit of the resources available, and the Courts have recognised that it would not be
reasonably practical to do so. Nevertheless, to deal efficiently and effectively with winter
events, operations need to be planned in a systematic manner and it is therefore
essential that a policy with clearly defined priorities is established. 
1.3 The policy outlines how the winter service will be delivered across the council and how
the road network has been prioritised for carriageways, footway, footpaths, and cycle
routes. The policy also details the levels of service that are to be achieved and
procedures around the winter decision making process. 
2. Report 
2.1 The Winter Service provided by the council takes cognisance of the recommendations
in the document Code of Practice ‘’Well-Managed Highway Infrastructure (2018)’’ for
Highway Maintenance Management.  Winter Service reviews are undertaken annually
to determine how the service can be improved with the resources available. A
contingency plan has been prepared for extreme weather events. 
2.2 Plans indicating the Primary and Secondary roads within each ward will be circulated
to Local Members and relevant information placed on the council web site. Copies of
the document will also be distributed to those listed in Appendix C of the document. 
Overview of Weather Conditions Over Previous Year 
2.3 In terms of the weather conditions through the winter period. In October temperatures
were just above the 1991-2020 average and it was wetter than normal with rainfall up
21.3% on the 1991-2020 climate average rainfall with well over 100mm of rain falling
in parts of the west.  Storm Babet impacted parts of Scotland on the 19th resulting in
Widespread and significant flooding in parts of Scotland.   
2.4 November saw temperatures lower than average and it was also drier than average
with 91% of normal rainfall.  Storm Cairan impacted the south of Scotland however
there was widespread and heavy rain, including much of the Central Belt experiencing
30-40mm across the region.  The picture of rainfall continued for most of the month.   
2.5 Temperatures in December were slightly above average, and it was also an unsettled
and wet month with rainfall being 61.6% higher than average.  Snow showers affected
the Central Belt at the start of the month.   
2.6 In January temperatures were a little below average in Scotland frost and rainfall above
average.  Weeks beginning the 8th and 15th saw periods of snow across much of
Scotland including the Central Belt.   
2.7 February was again a relatively mild and unsettled month with the temperature and
rainfall being 1.1C and 18.4% respectively, above the means.   
2.8 March started colder than average then largely remained above average through the
rest of the month.  Temperatures were around the average in April, although it was an
unsettled month with rainfall 72.5% higher than the 1991-2020 climate average.   
Winter Service Review 
2.9 Winter Service reviews are undertaken annually to determine how the service can be
improved with the resources available.  A review of the winter period was undertaken
Page 44 of 204

Page 45

on the 13 June 2024 in conjunction with the council’s partners Amey Public Services
which covered a range of items such as fleet, operations, monitoring of service,
resources, health, and safety etc.  The key points are detailed further below. 
2.10 The current partnership with APS operates a multi-functional fleet meaning that
vehicles can be used for both traditional road works and winter services. APS continue
to renew older fleet as it reaches end of life. During this period APS brought in 2
additional Muli-Purpose Vehicles which increased their resilience prior to the winter
period of 2024/25. Once again, the summer servicing of the tractor fleet had a very
positive impact which helped limit mechanical failures.  The new tractor unit
replacement program was completed prior to the start of the Winter period last year,
with a move to the John Deer model. The performance of the tractors was again closely
monitored by North Lanarkshire Council and APS and it was found that additional
access to tracking information would be helpful in determining when the routes are
being treated. This year their overall performance was good however there were
concerns expressed in some locations when snow had solidified on footpaths.  the
current treatment did not seem to thaw the snow therefore it was agreed that other
treatments be investigated for these situations.    
2.11 APS continue to maintain a sufficient driver resource and reported a positive upturn in
the recruitment of qualified drivers.  They also continue to maintain high standards of
driving via their Driver Certificate of Professional Competence (DCPC) training
program.  
2.12 During the winter period we experienced no systems failure with the forecasting
information from MetDesk. However, due to a very varied level of cloud cover during
periods the forecasts were a little more difficult to predict and, in these instances, a
worst-case scenario forecast was delivered and actioned. In addition to this, the
MetDesk forecasts are delivered at 12 noon and on a couple of occasions they were
delivered slightly late, however this did not affect the treatment, outcome, or delivery.  
This matter was immediately brough to the attention of our providers and was
discussed at the West of Scotland Local Authority weather consortium meeting and
assurances given by the provider that measures were put in place to avoid a
reoccurrence. MetDesk will be working closely with the West of Scotland Local
Authority Weather Forecasting Partnership (WoSLA) over the summer months to
introduce a rolling 72 hour forecast which will assist in planning treatments.   
Weather Station Improvements 
2.13 As part of the winter service and to assist in the forecasting of conditions, the council
operates five weather stations at the A803 Kilsyth, B7066 Hirst, A73 Brownshill, A73
Stand, and Sikeside Street, Coatbridge.  The weather stations provide a range of
information including road surface temperature, road condition, wind speed etc. and
the A803 Kilsyth is currently the only station not fitted with a camera to enable real time
information to be viewed by decision makers. 
2.14 The weather station at the A803 Kilsyth is a solar power station and as such it was not
possible to have a camera as part of this site.  This site was identified being at the end
of its life and members were previously advised of proposals to relocate the station to
enable a power connection which would allow a camera to be installed when the site is
upgraded.  This work was identified for completion last financial year however due to
land ownership issues it is now anticipated to be completed for the commencement of
the forthcoming winter period. 
Page 45 of 204

Page 46

2.15  Members were also advised previously of plans to further enhance the available road
condition information by installing a new a Groundcast (underground) and Tempcast
(above ground) sensor which would be located on the A89 Airdrie Road – East of
Raiziehill Farm, within the east domain.  This sensor will operate for a period of three
years and help inform whether an additional weather station in the east domain would
help improve forecasting information and service delivery, this work was completed in
September 2023. 
Route Forecasting Trial 
2.16 Members were previously advised of trials relating to route-based forecasting.  These
trials have been undertaken for the last two years with a view to reducing the salt used
as part of the winter service.  The data from the exercise has been considered and the
desired salt savings would not have come to fruition if route-based forecasting was in
place.  It is therefore proposed to cease any further trials and remain undertaking winter
treatment on the current domains detailed within the policy.  Industry developments and
innovation will continue to be monitored and where changes to existing procedures
would provide a benefit this will be reported to committee at that time. 
Member/ Officer Working Group 
2.17 At the Environment and Place Committee of 24 August 2022, it was agreed that a
member officer working group would be established to review the allocation of salt bins
throughout the Council area and determine how to maximise community resilience. 
2.18 There were two meetings of the working group in March and June of 2023 and one of
the actions was to data gather regarding filling of grit bins and this was to be reported
as part of this report for the approval of the Winter Service Policy and Procedures
2024/25.  Whilst the data has been gathered, the analysis will take longer than
anticipated and as such it is proposed to bring back a separate report on grit bins
detailing the outcome of this exercise.   This report would help to inform the position on
grit bins and ensure an equitable provision across North Lanarkshire an advance of the
2025/26 winter period. 
3. Measures of success 
3.1  The road network is generally available for residents, commerce, and blue light
services to use safely throughout the winter period enhancing North Lanarkshire as the
place to live, learn, work, invest and visit. 
4. Supporting documentation 
Appendix 1 –  Winter Service Policy and Procedures 2024/25 
Lyall Rennie
Chief Officer (Community Operations) 
Page 46 of 204

Page 47

Page 47 of 204

Page 48

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 48 of 204

Page 49

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 49 of 204

Page 50

APPENDIX 1
Contents                                                                                                         Page No 
1.  INTRODUCTION         2 
2.  POLICY         
2.1  Treatment of Roads       3 
2.2  Salt Stock Levels       5   
2.3 Level of Service       5 
3.  PROCEDURES 
3.1 Preparation of Routes       6 
3.2  Meteorological Reports      6 
3.3  Decision Making Process      7 
3.4  Resources        8 
3.5  Road Condition Reports      8 
3.6  Liaison with Police       9 
3.7  Warning Signs        9   
3.8  Road Closures        9 
3.9  Salt Bins        9 
3.10 Community Salt Stocks      10 
3.11  Keeping and Retention of Records     10 
Appendix 'A'  - Plan of Council Areas       11 
Appendix 'B'  - Office and Contact Details      12 
Appendix 'C'  - Distribution List       12 
Appendix 'D'  - Salt bin decision matrix      13 
Page 50 of 204

Page 51

NORTH LANARKSHIRE COUNCIL 
WINTER SERVICE 
1. INTRODUCTION 
Under Section 34 of the Roads (Scotland) Act, 1984, North Lanarkshire Council has a
statutory obligation to take such steps as it considers reasonable to prevent snow and
ice endangering the safe passage of pedestrians and vehicles over their public roads
which by definition includes carriageways, footways and footpaths. 
The A725, A8 trunk roads and the M73, M8, M80 and M74 motorways are the direct
responsibility of the Scottish Government.   
It is the aim of North Lanarkshire Council as the local Roads Authority to:- 
(i) provide a standard of service on public roads which will permit safe
movement of vehicular and pedestrian traffic appropriate to the
prevailing weather conditions; 
(ii)  establish a pattern of working which will keep delays, diversions or road
closures to a minimum during adverse weather conditions; 
(iii)  conduct operations having regard to the requirements of the Health and
Safety at Work Act, 1974. 
This winter service policy has been developed taking account of Well Managed Highway
Infrastructure A code of Practice (2018)’. 
This document is supplemented by a Winter Service Operational Plan developed in
conjunction with our service provider and updated annually. 
The provision of the service is supported by the Council’s Customer Services Hub. 
Page 51 of 204

Page 52

2.  POLICY 
2.1 TREATMENT OF ROADS 
North Lanarkshire Council has the following priorities for treatment of carriageways and
footways/footpaths that has been formulated on a hierarchical basis: 
CARRIAGEWAY PRIORITIES
Primary Road
Network 
These roads
are treated on a
Precautionary
Salting basis
All ‘A’, ‘B’ and some ‘C’ classified roads, main distributor roads; main
roads in the vicinity of schools; access roads to hospitals, ambulance
depots, main police stations and fire stations, and main bus routes.
Other main roads steeper than 1 in 10 gradient (10%) and roads that
are of local or national importance for the delivery of essential services.
Where severe weather conditions are predicted these roads will be pre-
salted and this will normally be carried out before the morning peak.
Depending on weather conditions this could also involve an evening
pre-salt. Where severe conditions such as snow persist, resources will
remain concentrated on these roads.
Secondary
Road Network  
These are
treated on a
Post Salting
basis, except as
described for
schools. 
Secondary distributor roads; access to isolated villages and rural
communities; a main access road to each school; rural through routes
not included above; spine roads into residential and industrial areas.
Residential areas with road gradients steeper than 1 in 12.5 (8%),
where the length of gradient exceeds 100m and where specific
difficulties have been identified and where it is practical to do so. 
Secondary roads will be post treated when road surface temperatures
are forecast to stay below zero for a significant period beyond 12
noon, following the precautionary treatment of the primary road
network. 
Where road surface temperatures are forecast to stay below zero for
a significant period beyond 12 noon and when resources are
available secondary routes will be pre-treated to improve travel to
school.
Other Roads
These are
treated on a
Post Salting
basis. 
On the satisfactory completion of post salting of the abovementioned
roads and if severe weather conditions persist, the remaining road
network will be treated on a reactive basis. Treatment will be
dependent on resources and changing weather conditions. 
Depending on weather conditions, treatment of the remaining network
may take several days from onset of severe weather as priority will be
given to, and concentrated on, the above stated road hierarchy. 
Post salting will only be undertaken if severe weather conditions are
likely to extend for a significant period beyond 12 noon. Post salting
operations will normally be undertaken out with the morning peak. 
During a period of prolonged severe weather conditions forecast to last
longer than 7 days, blue light enquiries will be prioritised, and priorities
will also take into account funerals, weddings, births and anyone
requiring immediate hospital treatment (the council will coordinate this
element of operations with NHS Lanarkshire).  Reactive squads will
Page 52 of 204

Page 53

FOOTWAY, FOOTPATH AND CYCLE ROUTE PRIORITIES 
Primary Path
Network -
Treated on a
Precautionary
Salting basis 
Urban Shopping areas, precincts, and main pedestrian routes remote
from carriageways which link major residential /commercial / industrial
/ educational facilities. 
Secondary Path
Network –
Treated on a
Post
Salting basis. 
Footways and Footpaths not covered above and Cycle Routes 
The treatment of primary path network will normally be carried out before the morning
peak. The Secondary path network and other paved areas shall only be considered for
treatment in times of persistent ice or snow.   
also prioritise special education needs schools, cemeteries, council
sheltered housing and ice on ponds. 
In some cases, roads may remain untreated until weather conditions
ease.
Snow Clearing
Operations 
Following the onset of heavy snowfalls the maximum available fleet of
ploughing vehicles will be utilised. These operations will continue whilst
snow is still falling with resources targeted to keep arterial routes open.
After snow has stopped falling but is still lying, routes will be treated in
line with salting priorities as resources permit. During prolonged events
forecast to last more than 7 days additional resources supplied by Land
Management or other resources will be deployed. 
Patrolling When marginal forecasts predict temperatures approaching but not
expected to dip below zero degrees and when forecasters are low in
confidence about their predictions, patrolling takes place.  This
operation is principally to check what the actual road conditions are
on the network. A representative sample of the network will be
patrolled to identify if a full pre-cautionary salt is necessary.
Page 53 of 204

Page 54

2.2 SALT STOCK LEVELS 
In extreme conditions salt stock levels can fall significantly in a very short period. In
certain rare and unusual circumstances normal re-stocking of salt has in the past been
prevented by external forces out with the control of the Council and its partners. If such
an occurrence is repeated in the future, to conserve limited salt stocks, the winter
service provision will be dedicated to the treatment of the primary networks only. 
APS have covered storage areas that hold a maximum of 10,000 tonnes of salt. The
salt held in stock is monitored on a weekly basis to ensure that the average stock level
of 7,500 tonnes is maintained during the high season. This average stock level is
reduced to 4,500 tonnes at the end of February. 
The Council also has a covered strategic salt stock of 10,000 tonnes to enhance
corporate resilience for the delivery of all services during periods of prolonged severe
winter weather.  
2.3      LEVEL OF SERVICE 
The decision to initiate winter service operations will normally be based upon the
forecast received from the council’s weather service provider during the winter period. 
These forecasts will be provided every day at 0600hrs, 1200hrs and 1800hrs (including
weekends and public holidays) to staff providing the winter service. In addition, the
weather service provider will contact the Council’s partner, APS if there is any major
change in the projected weather conditions. 
Winter service operations will also be initiated by APS on confirmed reports of adverse
weather conditions. 
As the decision to initiate winter service operations will normally be based on the
weather service forecast, it is proposed where possible to treat primary roads out with
the hours of peak traffic flows. Therefore, it is intended that the treatment of all primary
roads will be completed prior to the morning peak (0730 hrs).  Where forecasts indicate
adverse conditions in the evening, all reasonable effort will be made to treat primary
roads out with the evening peak, but this will not always be practicable. 
Primary Path Network salting operations will be generally undertaken between the
hours of 0500 hrs and 0800 hrs. Following prolonged periods of cold dry weather salting
may not be undertaken if it is considered that sufficient residual salt is present. If severe
weather is forecast in the evening, treatment of footpaths will be undertaken during
daylight hours where there is no residual salt present and heavy precipitation is not
forecast. 
Carriageway treatment will normally be undertaken within the following timescales. 
• Primary Road Network – completed within 3.5 hours of commencement of
treatment. 
• Secondary Road Network – completed within 3.5 hours of the completion of
Primary roads network, subject to weather conditions and the need to repeat
treatment on the primary road network. 
• Other Roads – these are dependent on weather conditions and resource
availability and may be measured in timescales of several days from onset of
severe weather.
Page 54 of 204

Page 55

In recent years several attacks on the winter fleet have been perpetrated by individuals
throwing missiles. This has caused damaged to vehicles and had the potential to
seriously injure winter service operatives. Where such instances occur, the service will
be withdrawn / restricted until a risk assessment considers it is safe to reinstate the
normal level of service.  
3. PROCEDURES 
3.1 PREPARATION OF ROUTES 
Prior to the commencement of the winter service period, the council’s roads winter
service contractor will prepare a list of priority routes based on the carriageway,
footway, footpath and cycle path priorities shown in section 2. However, to minimise
unproductive mileage some roads in a lower category may be treated out of sequence. 
A full set of priority routes will be kept by the Chief Officer (Community Operations). 
The winter service provider will also have a full set of routes. 
Any alterations to the carriageway, footway and footpath priorities will be notified in
writing to the roads winter service contractor who will make the necessary adjustments
to the routes. 
3.2 METEOROLOGICAL REPORTS 
Arrangements shall be made by the Chief Officer (Community Operations), through the
West of Scotland Weather Consortium, for the weather forecast to be provided for the
North Lanarkshire Area from early October to the middle of May each year. 
The weather service provider will provide the Council and it’s roads winter service
contractor with the forecast each day at 0600hrs, 1200hrs and 1800hrs and any other
weather warnings out with these times throughout the winter service period. 
The Council will ensure that weather service provider is provided with the telephone
numbers of the members of staff responsible, on a rota basis, for initiating action out
with normal working hours. 
The roads winter service contractor and the Council’s staff have the facility at any time
to contact the weather service provider’s duty forecaster to discuss/clarify the forecast. 
All staff involved in decision making for the delivering of the Winter Service shall be
trained in the interpretation and comprehension of climatic, temperature and weather
conditions and forecasts.  
Page 55 of 204

Page 56

3.3 DECISION MAKING PROCESS 
The topography of North Lanarkshire is such that three distinct geographical areas of
potential climatic variation have been identified. The weather forecast provides
information for these geographical areas to reflect different climatic conditions. These
forecasts will be used by the council’s roads winter service contractor to determine and
plan the scope of work necessary and to minimise unnecessary treatment and action. 
The winter service period is split into a High and a Low Period. During the High Period,
mid-October to mid-April, the council’s roads winter service contractor has resources
on standby to react to prevailing weather forecast. During the Low Period, between
early October and mid-October and mid-April to mid-May the council’s roads winter
service contractor may not be on standby and therefore reaction times may be greater.
These periods can be altered as required to reflect longer term weather forecast.   
When the staff member of the council’s roads winter service contractor receives the
weather forecast at 1200 hours they shall make a decision on whether or not action is
required. All proposed actions will be acknowledged by the Client standby officer.
Further, the Client reserves the right to amend the proposed action if deemed
necessary. The Client standby officer will approve all actions. The Council has access
to 5no. weather stations to assist the decision-making process. 
When updates to the forecast are received out with normal working hours the staff
member on standby for the council’s roads winter service contractor shall take
appropriate action based on the update. If there is a significant change to the weather
forecast and / or proposed actions the appropriate Client staff will be informed. 
During periods of low temperature, if there is uncertainty about the course of action
required by the update, consultation will take place with trained members of staff and
/or the duty forecaster from the weather service provider. 
The provision of an internet Weather Consortium Message Board for posting of
decisions taken by North Lanarkshire Council and by adjacent Authorities will allow
continuity of service to be monitored and action taken where it is considered
appropriate. North Lanarkshire Council actions will be posted together with updates to
proposed actions. 
Decisions taken regarding North Lanarkshire routes will be recorded on the Winter
Service electronic management system. 
. 
Page 56 of 204

Page 57

3.4 RESOURCES 
(a)  Salt 
Under the Road Street Lighting and Winter Services contract, it is the responsibility
of the council’s roads winter service contractor to organise the provision of salt to
each depot and ensure the levels of salt do not fall below the prescribed minimum
levels.   
At main recycling centres within the Council Area, a single quantity of 20kg or less
of sand salt mix will be available for issue free of charge to the public, subject to
them supplying a suitable container. 
(b) Personnel 
The council’s roads winter service contractor will provide a stand-by rota of
supervisors and manual operators for the winter service period. Standby will
commence in mid-October and continue until the middle of April. However, this
period may commence earlier or finish later should conditions warrant. 
During moderate winter weather it is envisaged that resources from the council’s
roads winter service contractor will be able to provide the level of service described
in section 2.2. In extreme conditions, however, additional labour may be required
from other sources, including other services of the Council. 
(c) Plant 
During the summer period, all equipment for salting roads and clearing snow will
be maintained to ensure it is in working order prior to the start of the winter service
period and where appropriate ensure that ancillary items can be fitted to vehicles
without difficulty. 
The council’s roads winter service contractor will provide a communications
system between the depot and all the winter service fleet. 
The winter fleet is fitted with data logging and a Geographic Positioning System
(GPS). 
3.5 ROAD CONDITION REPORTS 
Each working day throughout the winter service period, a daily report of the operations
that have taken place during the previous 24 hours will be available on the electronic
manager system.  The report shall provide information on routes treated, salt used,
time operations started, roads closed, additional resources used and details of any
other major problem. 
The report is available to the Chief Officer (Community Operations) and the Roads
Teams, any major incident will be reported immediately to Client staff. 
Page 57 of 204

Page 58

3.6 LIAISON WITH POLICE 
In recognition of the role of the Police during difficult weather conditions, the council’s
roads winter service contractor shall advise the Police of all adverse forecasts relating
to winter operations. The council’s roads winter service contractor shall also request
appropriate assistance from the Police when moving equipment, arranging road
closures, and dealing with abandoned vehicles.   
Where appropriate, the council’s roads winter service contractor shall advise the Police
at the Force Control Room of all extreme adverse road conditions, including roads
closed or conditions which may lead to roads being closed. The Police may report such
matters to the broadcasting authorities. Such communications will be followed up by
reports on progress and clearance, particularly when conditions are returning to
normal. On request to their Group Traffic Superintendent, the Police have agreed to
assist the movement of ploughs and salting vehicles on principal traffic routes. 
The council’s roads winter service contractor shall issue out of hours rotas (including
amendments) to the Chief Constable, Divisional Commander's Office and local Police
Offices. 
Reports from the Police regarding dangerous road conditions shall be acted upon by
the council’s roads winter service contractor’s designated staff on stand-by as soon as
practicable, having regard to priorities in this document and the conditions pertaining
throughout the Council's area. 
3.7 WARNING SIGNS 
The Chief Officer (Community Operations) shall at appropriate locations arrange for
the erection of signs giving warning of sections of road liable to icing. 
3.8 ROAD CLOSURES 
Where a road is closed, the council’s roads winter service contractor is responsible for
ensuring that the Police and Council staff are advised and that appropriate signs are
erected.  When the road continues into an adjoining Council area that Council shall be
kept informed. 
3.9 SALT BINS 
Salt bins will be provided in the vicinity of all school.  They may also be provided at
specific locations to assist the local community in areas not on priority routes or at
known trouble spots including steep gradients and sharp bends.  Bins will only be
provided at those locations that meet the minimum scoring criteria set out in appendix
D and where agreement can be reached with the adjacent property owner/ occupier. 
It is intended that these salt bins are for the self-use of the public as an enhancement
to the service provided by the Council. Records of existing salt bin locations are held
by the Chief Officer (Community Operations) and detailed on the Council’s winter
service webpage. 
Page 58 of 204

Page 59

3.10 COMMUNITY SALT PILES 
Community Salt Piles will be provided at the following locations, establish for the
winter of 2021/22.
• Coatbridge - Time Capsule Coatbridge
• Airdrie – Airdrie leisure Centre
• Bellshill – Matt Busby Centre
• Motherwell – aquatec
• Wishaw – sports centre
• Kilsyth – sports centre
• Cumbernauld – Broadwood stadium
• Shotts – sports centre
• Northern Corridor – Ian Nicholson Centre
• Salsburgh  - Community Centre
• Viewpark – Car park at Burnhead CC
• Croy – area at hub
• Newmains – NCT Centre
• Moodiesburn – Pivot Centre 
3.11 KEEPING AND RETENTION OF RECORDS 
Appropriate records will be kept of the following by the council’s roads winter service
contractor :- 
(a)   The weather forecasts, including updates. 
(b)   Decisions taken based on the weather forecasts. 
(c)   Decisions taken based on other reports. e.g. police reports. 
(d)   Maximum and minimum air temperatures at each depot. 
(e)   Details and timings of routes salted. 
The council’s roads winter service contractor will be responsible for preparing and
retaining the above records for a minimum period of 7 years. Records from the Council
weather stations are held by the service provider. 
Page 59 of 204

Page 60

APPENDIX A 
PLAN OF NORTH LANARKSHIRE AND WEATHER DOMAINS 
Page 60 of 204

Page 61

APPENDIX B – CONTACT INFORMATION 
It should be noted that the service cannot react to individual requests for streets to be treated/
cleared therefore individual requests are no longer logged.  
All enquiries relating to the filling of and request of new salt bins should be directed to the
following 
New salt bin - Grit bin: request a new grit bin | North Lanarkshire Council 
Refill a salt bin - Grit bin: request refill | North Lanarkshire Council 
Website: www.northlanarkshire.gov.uk 
In the event of an emergency Police Scotland should be the first point of contact. 
APPENDIX C – DISTRIBUTION LIST 
Internal :- 
North Lanarkshire Local Elected Members
Chief Executive
Depute Chief Executive
Chief Officer (Legal and Democratic) 
External :- 
Trunk Road Operators 
Amey Public Services LLP
Automobile Association (AA)
Chief Executives of Adjacent Councils :-
(East Dunbartonshire, South Lanarkshire, City of Glasgow, West Lothian, Falkirk, Stirling)
Community Councils
Grid Controller, Scottish Gas
Road Haulage Association
Royal Automobile Club (RAC)
Scottish Ambulance Service
Scottish Government
Scottish Fire & Rescue Service – Service Delivery Director - West
Scottish Fire & Rescue Service – Chief Officer
Strathclyde Partnership for Transport
(Local Bus Companies distributed via SPT)
Police Scotland - Divisional Commanders
Scottish Road Partnership Project Ltd 
Page 61 of 204

Page 62

APPENDIX D – SALT BIN DECISION MATRIX 
Road name and number 
Is there a grit bin within 300m of the location* If yes do not proceed with assessment
Would this bin be placed on a public road If not do not proceed with assessment
Is there a suitable hardstanding location for a
salt bin
If not do not proceed with assessment
Is there agreement from the adjacent property
owner/ occupier
If not do not proceed with assessment 
Characteristic Severity Standards
Score
Assessed
Score
Gradient Gradient (>1 in 20)
Gradient (<1 in 20)
20
0
Bend Bend (> 90 degrees)
Bend (< 90 degrees)
10
0
Close proximity to and falling
towards 
A or B class Roads
Unclassified/ residential roads
10
0
On a treated route Primary carriageway  -10 
Vertical traffic calming
measures
Yes
No
10
0
Any special features
(Hospital, doctors surgery)
Yes
No
20
0
Total of 20 or
above qualifies 
*The 300m distance would be the walking distance using the existing footways/ footpaths,
shared surface, and shared spaces. 
Page 62 of 204

Page 63

Business Regulation Service Plan 2024-2025
North Lanarkshire Council
Report 
Does this report require to be approved? ☒ Yes  ☐ No
Ref IM/PB Date 21/08/24 
From Lyall Rennie, Chief Officer (Community Operations)
E-mail RennieLy@northlan.gov.uk Telephone 07855 193500 
Executive Summary
All local authority regulators of food law and occupational health and safety law must plan
their enforcement and advisory activities and, in accordance with independent auditor
preference, present that plan before a relevant committee for its approval. 
The report provides a summary of the service plan for the Council’s Business Regulation
Service which fulfils the Council’s obligations in respect of food law and health and safety
law. 
A copy of the service plan is enclosed at Appendix 1. 
Recommendations
It is recommended that the Environment & Climate Change Committee: 
(1)    Approve the Business Regulation Service Plan 2024-2025. 
The Plan for North Lanarkshire
Priority Improve the health and wellbeing of our communities
Ambition statement (14) Ensure the highest standards of public protection
Programme of Work Statutory / corporate / service requirement
1. Background 
1.1 The Business Regulation Service is a team with Community Operations’ Protective
Services and is responsible for the delivery of the statutory enforcement and advisory
service for: 
• Food law within all food establishments within North Lanarkshire; and
• Occupational health and safety law in those premises within North Lanarkshire for
which they have an enforcement responsibility (health and safety enforcement
within premises being split between local authorities and the Health & Safety
Executive (HSE) depending upon the nature of the business).
Environment & Climate Change Committee
Item 7
Page 63 of 204

Page 64

1.2 The Service is required to prepare an annual plan which clearly maps out specific
aims and objectives for the financial year. 
1.3 Food Standards Scotland (FSS) advocates that transparency is best achieved by
seeking and obtaining the approval of elected members. FSS has the primary
objective of protecting the health and other interests of consumers in relation to all
food issues. 
1.4 HSE’s national ‘Local Authority Enforcement Code’ requires us to be accountable to
the public and businesses for our actions. This can be achieved by the publication of
our service plan.
1.5 A copy of the service plan is enclosed at Appendix 1. 
2. Report
Food Law Code of Practice Recovery Plan 
2.1 FSS granted dispensation to local authorities to deviate from their annual food
inspection plans from 30/03/2020 due to the restrictions imposed during the Covid
pandemic, and to enable re-tasking of Environmental Health officers to undertake
wider public health duties related to Coronavirus legislation. The dispensation ended
on 31/08/2021, at which point local authorities commenced work recovery plans in
this area. 
2.2 During this financial year we will continue to implement the inspection recovery plan,
from year 3 into year 4 of the 5-year rolling plan. We have undertaken extensive risk
rating and forward planning to ensure that FSS remain satisfied that we are adopting
an appropriate recovery plan to ensure that all premises receive the required
inspection visits within a practicable and programmed timeframe. 
Food Law Performance Targets 
2.3 The service plan details resources and targets for inspections and interventions in
respect of food law, including: 
• Achieving a target of at least 80% of all our programmed food law inspections
within agreed timeframes. This is an increase on last years’ target which was set
at 75%.
• Ensuring at least 90% of our food business operators’ premises achieve a ‘Pass’
status in accordance with the national Food Hygiene Information Scheme (FHIS).
This is an increase on last years’ target which was set at 80%.
• Commence investigation of at least 90% of high-risk food and food premises
complaints within 2 working days of receipt, and commence investigation of at
least 90% of low-risk food and food premises complaints within 5 working days of
receipt. (This amends the target from last year, when the annual performance
measure did not distinguish between high-risk and low-risk.)
• Maintain a target of at least 94% of infectious disease cases being responded to
in accordance with the NHS Lanarkshire Epidemiological Investigation Protocol.
• Respond to at least 93% of high-risk requests for assistance / advice within 2
working days of receipt.
• Respond to at least 93% of low-risk requests for assistance / advice within 5
working days of receipt.
Page 64 of 204

Page 65

2.4 An important principle of the Food Law Rating Scheme (FLRS) is to allow local
authorities to target resources on high-risk and non-compliant businesses. The food
law intervention scheme rating is based upon a recent food business performance
model that targets resources on high to medium risk and non-compliant businesses.
This impacts upon the calculation used to determine the frequency of inspection of
food business establishments for both the ‘hygiene’ and ‘standards’ components of a
food law inspection. The FLRS takes account of a food business operator’s track
record of compliance and where this is good, the business will receive an ‘earned
recognition’ status influencing the risk rating to reduce the frequency of inspections.
This assists the Service by enabling resources to be targeted towards non-compliant
businesses which are subjected to more frequent inspections and enforcement
actions where required. 
Occupational Health and Safety Law 
2.5 The HSE’s national ‘Local Authority Enforcement Code’ sets out a risk-based
approach to targeting health and safety interventions to be followed by local authority
regulators. A key component is to ensure that appropriate interventions are focussed
upon specified high-risk sectors. 
2.6 In accordance with the national enforcement code, the Service will continue to
respond to requests for advice, investigate complaints, accidents, dangerous
occurrences and other incidents reported to us and we will undertake appropriate
interventions, particularly relevant to North Lanarkshire, wherever possible.
2.7 The service plan details activities which are planned to be undertaken throughout the
financial year in respect of our regulation of occupational health and safety matters.
2.8 Additional projects may also be added where appropriate, having being highlighted by
the HSE, regionally by the West of Scotland Health & Safety Liaison Group or through
local intelligence, complaint, notification or other direct referral to the Service. 
3. Measures of success 
3.1 Performance is monitored in several ways, including on a quarterly basis by update
and review at the Protective Services Management Team (PSMT). If under
performance or deviation from the plan is identified, corrective action is promptly
implemented.
3.2 Performance outcomes for all participant food businesses in respect of the ‘Pass’ and
‘Improvement Required’ standards stipulated in the national FHIS are reported locally
to populate key performance indicator requirements. These are published on FSS
website and accessible via the Council’s website:
https://www.northlanarkshire.gov.uk/business/food-safety/food-hygiene-information-
scheme. 
3.3 The quality of the performance and professional conduct of the Council’s Business
Regulation service enforcement staff during inspections of businesses (both food and
non-food based) was monitored, in part, using post-intervention customer service
questionnaires, in which service recipients were encouraged to provide their appraisal
of the standard of service delivered. This was stood down during the pandemic and
has since been reviewed to digitise the process. The new digitised process, which
commenced on 01/07/2024, includes a QR code and online survey link being added
Page 65 of 204

Page 66

to the templates of our standard letters so they will be included in correspondence
issued to all food establishments after routine interventions. Survey links are also
now available on our website. This will ascertain the perceived levels of customer
service and afford the recipients of our service an opportunity to make their views on
the level of customer service we provide known to us. By doing so, we also commit
to improve our standards where we can. 
4. Supporting documentation
Appendix 1 - Business Regulation Service Plan 2024-2025. 
Lyall Rennie
Chief Officer (Community Operations)
Page 66 of 204

Page 67

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact   
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact   
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.4 Legal impact   
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data? 
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 67 of 204

Page 68

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact   
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 68 of 204

Page 69

food safety/occupational health & safety service plan 2024/2025 1 
Appendix 1: Business Regulation Service Plan 2024-2025 
Community Operations 
Protective Services
(Business Regulation Service)
Food Safety/Occupational Health & Safety
Service Plan 2024/2025
Page 69 of 204

Page 70

food safety/occupational health & safety service plan 2024/2025 2 
STATUTORY AND GENERAL OBLIGATIONS ON FOOD AUTHORITIES 
Legal Obligation on Food Authority 
Compliance with statutory guidance ‘Food Law Code of Practice (Scotland) 2019’ (the Code) and ‘Interventions Food
Law Code of Practice (Scotland) 2019’ (the Interventions Code) is an important requirement to safeguard and ensure
proper and consistent administration of food law across Scotland. 
In delivery of Official Food Controls, North Lanarkshire Council is legally required to ensure:
a) The effectiveness and appropriateness of Official Controls.
b) That controls are applied at an appropriate risk-based frequency.
c) That there are a sufficient number of suitably qualified and experienced competent staff and adequate
facilities and equipment to carry out duties properly.
d) That staff are free from conflicts of interest.
e) That there is access to an adequate laboratory capacity and capability for testing. 
Food Standards Scotland (FSS) seeks to work in partnership with Local Authorities to help them deliver on official
control policies and Codes, and to assist them in implementing the Codes. 
Effects of Failure to Comply with these Statutory Obligations
Section 40(2)(a) of the Food Safety Act 1990 requires a local authority to have regard to the relevant provisions of
the Codes. Section 40(3) allows FSS to consult Scottish Ministers in relation to non-compliance with the Codes to
order the issue of a direction to a local authority requiring it to take steps to comply with the Codes. Failure to
comply with a ministerial direction by a local authority may be sanctioned by order of the Court of Session. Where
Scottish Ministers are satisfied that a Food Authority has failed to discharge any duty imposed by or under the Act,
and where that failure affects the general interests of consumers of food, they may by Order empower another Food
Authority or officer of the Ministers to discharge that duty in place of the Authority in default, and recover costs from
the defaulting Authority. 
Requirement to Prepare an Annual Service Plan 
Each Food Authority should complete an Annual Service Plan which details the Interventions programme for the
coming year. They should ensure such a programme is adequately resourced and that the overall plan is subject to
approval timeously at the appropriate governance level within the Local Authority.
The Service Plan should include: -
• A statement in relation to the Food Authority’s approach or policy on Interventions, Enforcement, and
Service Delivery.
• A Food Authority’s approach to Interventions out-of-hours.
• Details on how new Food Business Establishments are to be included in the Authority’s planned Intervention
Programme.
• Effective routine sampling.
• Strategies for maintaining surveillance of “low-risk” establishments where the LA has decided these will be
subjected to alternative enforcement strategies in either their Food Service Plan or Enforcement Policy. 
The Service Plan or Enforcement Policy should include: -
• The Food Authority’s approach to revisits and enforcement action - North Lanarkshire’s approach to
enforcement is included within the Enforcement Policy. Its approach to revisits and enforcement action is
incorporated within Food Policies and Standard Operating Procedures (SOPs) which are an extension of the
Enforcement Policy.
Page 70 of 204

Page 71

food safety/occupational health & safety service plan 2024/2025 3 
• Strategies for maintaining surveillance of “low-risk” establishments where the LA has decided these will be
subjected to alternative enforcement strategies in either their Food Service Plan or Enforcement Policy.
North Lanarkshire has included these within both the Service Plan and the Interventions SOP which are an
extension of the Enforcement Policy. 
The Interventions Programme should include:-
• The Food Business Establishment profile.
• The number of Interventions programmed.
• An estimate of the number of revisits that will be made.
• An estimation of resources required.
• Resource for new businesses.
• Detail any targeted Intervention activity that the Food Authority intends to carry out including any extra
resources this may require.
• Identification of any priorities relating to nationally or locally driven outcomes, such as compliance with new
legislation or improved compliance with existing legislation and other central government initiatives,
including compliance with the Code and the Interventions Code. 
SECTION 1: SERVICE AIMS AND OBJECTIVES 
1.1 Aims and Objectives
North Lanarkshire Council is committed to delivering customer excellence for all its service users to maximise the
benefits of North Lanarkshire’s geographical location, creating prosperity, achieving social justice and fulfilling local
needs by providing best value. 
The following aims and objectives have been identified as being fundamental to this process:
1. To place the safety, health and well-being of the employed and the general public foremost. 
2. To protect public health and affirm the continuing commitment to assist businesses in their recovery from the
pandemic.
3. To inspect businesses for food safety law and/or health and safety law compliance within at least the minimum
targets which have been set for inspection purposes and ensure that a proportionate and consistent
enforcement policy is adhered to. 
4. To commit to the national Regulators’ Code for reserved matters and the Scottish Regulators’ Strategic Code of
Practice for devolved matters. 
5. To undertake a programme of effective routine food sampling to ensure that food is of the nature, quality and
substance demanded by the public and to take appropriate action to remove any unsatisfactory foodstuffs
identified during this process.
6. To respond appropriately to relevant food alerts as required by FSS.
7. To investigate food and food premises complaints and report to the Crown, recommending that they initiate
legal proceedings where this is deemed to be in the public interest. 
8. To offer free advice and guidance to the public, voluntary organisations and the food and health & safety
businesses within North Lanarkshire for the purposes of achieving compliance with statutory requirements and
assisting in developing and promoting competence in food and workplace health & safety awareness.
Page 71 of 204

Page 72

food safety/occupational health & safety service plan 2024/2025 4 
9. To prepare reports and other related data for other Services within the Authority, FSS, the Health & Safety
Executive (HSE) and other relevant Agencies to demonstrate transparency, ensure compliance with legislation
and to provide a coordinated approach to food law and occupational health & safety law. 
10. To investigate instances of food and water borne diseases within North Lanarkshire in a coordinated approach
with the relevant Health Authorities.
11. To fully and promptly investigate notifications of work-related accidents, dangerous occurrences and ill health
and take enforcement action in accordance with guidance to prevent harm and secure justice, where
appropriate. 
12. To respond promptly and courteously to requests for assistance and commit to the delivery of customer service
excellence for all our service users. 
13. To aim to deliver public confidence in the way food safety and health & safety issues are monitored and enforced
within North Lanarkshire.
14. To respond appropriately and effectively to public health emergencies which impact on public safety. 
1.2 Links to Corporate Ambition Statements and Priorities
This Operational Plan is linked with the Protective Services Operational Plan and is made in accordance with
aspirations and objectives contained within the Plan for North Lanarkshire. 
For example, from The Plan for North Lanarkshire:
‘Improve economic opportunities and outcomes’
The growth and sustainability of local business is actively supported. Working in partnership with Business Gateway,
we offer a comprehensive and free consultancy service to start-up, fledgling and mature businesses to help with
legal compliance in relation to food safety and, where appropriate, occupational health & safety legislation. (This
was stood down due to the pandemic, but we will resume liaison as part of business recovery.) 
‘Improve the health and wellbeing of our communities’ 
In accordance with the Code and the Interventions Code, formal, unannounced inspections of North Lanarkshire’s
food businesses are undertaken to ensure operators make or sell foods which meet compositional and declaration
legal standards, are safe to eat and will not cause illness or disease. Where food businesses are found operating
unsafely, they may be compulsorily closed or prohibited from undertaking specific activities to safeguard public
health, reported to the Crown and the unfit foods seized for destruction (as appropriate). The only food businesses
which would not be subjected to proactive inspections are low risk Group 3 Band A premises which, following initial
or subsequent intervention or where the food registration form gives sufficient information to make determination
that there is minimal inherent risk, and the Lead Food Officer determines either to place the business on a 60-month
intervention frequency or choose not to undertake a proactive intervention. 
We respond quickly to consumer concerns about food business operators, whether that is the condition of their
premises, the state of the food products or the malpractices allegedly conducted there. 
The Service investigates outbreaks of infectious disease in conjunction with NHS Lanarkshire and acts over concerns
of poor public or private water supplies. The Service implements a monitoring programme for each regulated supply
and each private water supply zone. For regulated supplies, we undertake risk assessments, where applicable, in
Page 72 of 204

Page 73

food safety/occupational health & safety service plan 2024/2025 5 
relation to water introduced into, and supplied through and from, each private water supply system to premises in
its area, to establish if there is any risk that the water could pose a potential danger to human health. 
A similar service exists for occupational health & safety where the local authority is the relevant enforcement body.
During the pandemic, the Service took on an advisory and enforcement role in terms of Covid related Regulations to
prohibit certain businesses from opening, and to ensure that social distancing arrangements and other mitigations
were in place for businesses that were allowed to continue to trade under restricted conditions. This role included
business compliance visits and outbreak investigations. Whilst restrictions are no longer in place, there may be a future
ask from the Service in respect of pandemics. 
Plan for North Lanarkshire 
The Plan for North Lanarkshire identifies 25 high level ambition statements aligned into five priorities and the
Business Regulation’s Food Safety /Occupational Health & Safety Service Plan links with these priorities as follows: 
Improve the health and wellbeing of communities 
• Programme of targeted interventions to determine compliance with statutory requirements along with
proportionate enforcement action, as required.
• A commitment to the prevention of death, injury and ill health arising out of or in connection with a work
activity.
• Food sampling programme.
• Partnership working with NHS Lanarkshire to locate the source and prevent the further spread of infection.
• Focusing on specific health & safety issues.
• Working in partnership with NHS Lanarkshire, FSS, the HSE and other agencies to promote and deliver health
improvements for the employed within North Lanarkshire and its citizens.
Improve North Lanarkshire’s Resource Base
• Provision of food safety literature and correspondence in a range of ethnic minority languages along with
access to interpreters to promote social inclusion.
• Updating and maintaining enforcement officer competence.
• FHIS (Food Hygiene Information Scheme).
• Online publication of food law intervention letters and of register of notices served under The Food Hygiene
(Scotland) Regulations 2006, Regulations 6 to 9 and the Health and Safety at Work etc. Act 1974, Sections 21
and 22.
• BS ISO 45001 : 2018 (the occupational health and safety management standard). 
Business Regulation regards high quality public service as its key value and this commitment is reflected in that the
Service achieved ISO 45001 accreditation. Key food safety and health & safety policies and procedures are in line
with ISO 9001: 2015 Quality Management System and are periodically reviewed to reflect procedural changes. 
Business Regulation aims to support and work alongside various organisations including FSS, HSE, Police Scotland,
Scottish Fire & Rescue, NHS Lanarkshire and Public Health Scotland to deliver common objectives which prevent or
mitigate against illness, disease or injury and to deliver better health outcomes for residents, consumers and
employees by sharing and promoting best practice for food safety, public health and occupational health & safety
interventions. Where appropriate we will link service provision to any national and local updated plans and strategies
relevant to the recovery process post pandemic.
Page 73 of 204

Page 74

food safety/occupational health & safety service plan 2024/2025 6 
SECTION 2: BACKGROUND
2.1 Profile of the Local Authority 
North Lanarkshire is the 4th largest authority in Scotland with a population of 341,140 and an area of 47,222 hectares
(2021). It is situated approximately halfway between the cities of Glasgow and Edinburgh and many of its residents
live in the six main towns of Airdrie, Coatbridge, Cumbernauld, Bellshill, Wishaw and Motherwell.
North Lanarkshire is in the midst of a process of major social, economic and environmental change. This has required
a process of regeneration which is perhaps best illustrated in the Ravenscraig initiative whereby work has been
proceeding with large commercial and residential developments on the former steelwork’s site.
This process of economic regeneration will continue and is greatly assisted by the strategic location of North
Lanarkshire with regard to links to the South via the M73 and M74 and to Glasgow and Edinburgh via the A8/M8
motorways. Extensive improvements to the local motorway network and various arterial roads, recently completed,
following a massive infrastructure investment and upgrade.
Page 74 of 204

Page 75

food safety/occupational health & safety service plan 2024/2025 7 
Here is a plan of North Lanarkshire Council’s catchment zone. 
Page 75 of 204

Page 76

food safety/occupational health & safety service plan 2024/2025 8 
Senior EHO (North)
Assistant Business Manager
(Business Regulation)
Central Division
5 X FTE EHOs 
Senior EHO (Central)  Senior EHO (South)
Protective Services Manager
(Responsibilities include Business
Regulation, Pollution Control & Public
Health and Trading Standards)
Chief Officer
(Community Operations)
North Division 
4.5 X FTE EHOs
+
1 X FTE FSO
South Division 
5 X FTE EHOs
+
1 X FTE FSO
2.2 Organisational Structure
The configuration of the Business Regulation Service for 2024/2025 (at June 2024). 
Page 76 of 204

Page 77

food safety/occupational health & safety service plan 2024/2025 9 
2.3 Scope of the Business Regulation Service
The services which are provided include: - 
• Advice/Guidance to the Private Sector/Voluntary Groups as well as to business.
• Compilation of Performance Indicator Data (e.g., NLC PI data, LAE1, FSS Audit returns etc.).
• Disposal/Seizure of Unfit Foodstuffs.
• Eat Safe Initiative.
• Export Health Certificates.
• Attestations & Food Premises Compliance Certificates for Export.
• Food Law Interventions.
• Food Safety Alerts.
• Food Safety/Health & Safety Promotional Initiatives.
• Approval of Premises under Regulation EC No 853/2004.
• Official Control Verification (OCV) audit process of Premises Approved under EC No 853/2004.
• Food Hygiene and Food Standards Inspections of Primary Producers.
• Food Standards Inspections of Meat Plants Approved under EC No 853/2004 by FSS.
• Formal/Informal Food Sampling.
• Frequent Liaison with FSS and NHS Lanarkshire Public Health.
• Health & Safety Interventions.
• Originating Authority Responsibilities.
• Infectious Disease Investigations.
• Enforcement within Skin Tanning Premises.
• Investigation of Complaints Regarding Workplaces.
• Investigation of Food Complaints and Food Premises Complaints.
• Investigation of Workplace Accidents, Dangerous Occurrences and Occupational Ill Health.
• Licensing and Inspection of Skin Piercing & Tattooing Premises.
• Licensing of Venison Dealers.
• Monitoring of Compliance with the National Tobacco Smoking Ban in Public Places.
• Precognition/Reports to the Crown Office & Procurator Fiscal Service.
• Private Water Supply Register, Risk Assessments, Sampling, Grant Assistance & Water Scarcity.
• Promoting Healthier Food in Catering.
• Public Mains Water Sampling.
• Reports to Licensing Boards.
• Representation on the West of Scotland Health & Safety Liaison Group.
• Representation on West of Scotland Food Liaison Group.
• Responses to Building Warrants and Planning Enquiries.
• Shared maintenance of the FHIS Website at a local input level.
• Work in Partnership with the HSE on National Campaigns & Initiatives.
• Shared maintenance of Scottish National Database (SND) at local input level.
• Advisory and enforcement role in respect of Pandemic legislation, including business compliance visits and
outbreak investigations. 
Chemical analysis and microbiological examination of food samples is undertaken by Glasgow Scientific Services
(GSS) on behalf of the Service.
The Service has access to translation services for documentary purposes and to facilitate routine inspections and
other food and health and safety enquiries where this is required.
Page 77 of 204

Page 78

food safety/occupational health & safety service plan 2024/2025 10 
The approach to the Code and the Interventions Code and focuses predominantly on intervention and audit of premiss
to the 4 Es approach of Engage, Explain, Encourage and Enforce.
Feed issues are dealt with exclusively by FSS. 
Our Service headquarters is currently based at Civic Centre, Windmillhill Street, Motherwell ML1 1AB but is due to
relocate during 2024/2025.
2.4 Demands on the Business Regulation Service 
Food establishments are grouped as 1 to 3 depending on the nature of the food business, with Group 1 businesses
including e.g. manufacturers of high risk foods down to Group 3 businesses including licensed premises not providing
catering. Within each of the groups the food establishment is risk rated in Bands A to E, dependent upon the
business performance and compliance, with Band A being sustained compliance and E being serious non-compliance,
which includes any non-compliances that are an immediate risk to consumer health, allow consumers to make
unsafe food choices or could give rise to fraudulent gain. 
The data relating to the food premises profile is in the following tables. 
Food Law Business Groups and Risk Ratings
1A 35
1B 13
1C 1
1D 1
1E 0
Awaiting Inspection 1
Food Standards Only* 4
Total 55 
2A 261
2B 858
2C 414
2D 9
2E 2
Awaiting Inspection 26
Total 1570 
3A 128
3B 843
3C 90
3D 
1
3E 0
Awaiting Inspection 15
Total 1077 
Total 2,702 
Page 78 of 204

Page 79

food safety/occupational health & safety service plan 2024/2025 11 
SND Category & Premises Count 
Primary Producers 22
Manufacturers & Packers 84
Distributors/Transporters 68
Retailers 477
Supermarket/Hypermarket 65
Small Retailer 7
Retailer-Other 9
Restaurant &Caterers 241
Restaurant/Café/Canteen 208
Restaurant/Caterer-
Others
612
Hotel & Guest house 32
Pub/Club 237
Takeaway 457
Caring Premises 50
School/College 145
Total 2,865
Note: Food Standards Only*- Included within the figures above are 4 meat plants which are approved by FSS but for
which we enforce Food Standards legislation. 
In addition to numbers referenced within the Food Law Business Groups and Risk Ratings table above, there are:
• 20 separate establishments currently approved under EC Regulations;
• 14 primary producers (dairy farms);
• 3 Premises ungrouped awaiting inspection;
• 30 Premises on our MIS without Food Law Intervention Codes. 
Our Management Information System (MIS) is a live system with information being automatically uploaded to the
SND on a weekly basis, which accounts for some disparity in totals. Last year we undertook a housekeeping
exercise of our MIS as we had identified 189 premises without Food Law Intervention Codes. A number of these
were duplicate premises, but some weren’t and resulted in additional interventions being programmed in
throughout the year. We have repeated this housekeeping exercise and have identified 30 premises without Food
Law Intervention Codes, which is a significant reduction on last year. An exercise will be undertaken to identify which
of these premises are not duplicates so they can be included in the intervention programme.
We have approximately 3,500 businesses at present for which we have responsibility for the enforcement of
occupational health & safety law.
The new Food Law Rating System (FLRS) ensures that the profile of food standards is raised whilst reducing
duplication and bureaucracy caused by two inspection regimes. Importantly, Local Authorities can target resources
on high risk and non-compliant businesses. Even as an early adopter, the pause in the intervention programme
brought about by the pandemic meant that not all premises within North Lanarkshire had undergone a food law
intervention, and as such had not been banded. We changed from Annex 5 rating scheme to the FLRS based on
guidance provided by the Scottish Food Law Enforcement Committee (SFELC) COVID-19 Recovery Working Group
using a formula based on Annex 5 food hygiene scores for hygiene, structure and confidence in management alone,
as it was assessed that a number of the other elements previously contained in Annex 5 had been taken into account
at the ‘Group’ stage, and that confidence in management scores were, in the vast majority of cases, consistent
between food hygiene and food standards scoring systems. In order to ensure, however, that food standards were
given an appropriate level of consideration during the desktop premises ratings transfer, at the end of the process
we conducted a final check to ensure that any establishment which had previously been given a poor rating for ‘Level
of Compliance’ in Annex 5 Food Standards Scoring System would be given a ‘Band D’ in FLRS. Within NL, none were
Page 79 of 204

Page 80

food safety/occupational health & safety service plan 2024/2025 12 
identified. Whilst this exercise had a significant impact on officer time, it assisted in identifying priorities for the food
law recovery process.
One of the Key Performance Indicators for the Service is the percentage of food establishments which achieve the
Food Hygiene Information Scheme (FHIS) ‘Pass Award’. Our target for 2019/20 was set at 90%, with an overall rate
achieved of 94.09%. It was anticipated there will be a greater number of Improvements Required due to the pause
in programmed interventions due to the Covid-19 pandemic and the authorised deviation from the Code from 30
March 2020 to 31 August 2021. Our target for 2022/23 was set at 70%, with an overall rate of 94.8% and our target
for 2023/24 was set at 80%, with an overall rate of 95.6%. Our target for 2024/2025 has been set at 90%, which is
the same as the target that was set pre-Covid in 2019/2020. 
Our normal business hours are 08.45am to 16.45pm, Monday to Thursday with a 16.15pm closure on Friday.
However, a standby service is available to respond to emergencies including Food Alerts For Action (FAFA), outwith
normal business hours. 
EU exit impacted on the Service due to preparation for food exports and in particular fish exports to the EU. Further
detail is provided on this in Section 3.9 ‘’EU Exit’’.
2.5 Enforcement Policy 
North Lanarkshire Council has a documented enforcement policy which was approved by Elected Members at the
Infrastructure Committee in September 2018 and is available on the NLC website to businesses and consumers. The
policy was updated to reflect: -
• Changes in legislation;
• The effect of the Scottish Regulators’ Strategic Code of Practice (SRSCoP) on food safety matters;
• Due regard to the general principles of the Regulators' Compliance Code in respect of health and safety
matters;
• Advice issued by Food Standards Scotland (FSS) and the HSE; and
• Relevant provisions of the Code for Crown Prosecutors.
Food Standards Scotland’s direction is that enforcement policies last reviewed 8 to 10 years ago will again be
reviewed and approved. The NLC enforcement policy is due to be reviewed in 2026. 
All Authorised Officers with responsibility for inspecting premises and/or dealing with other food and health and
safety issues are aware of the enforcement policy. Authorised Officers are also aware that it is the Council’s policy to
offer advice where this is appropriate or requested, particularly in regard to small and medium sized businesses. 
Arrangements will be made to inspect and register any food premises found to be trading but which have not
registered with the Authority. It will not normally be the policy of the Authority to submit a report to the Crown
regarding failure to register alone unless a food business operator habitually refuses to do so or in combination with
the discovery of unregistered premises in a serious state of non-compliance with food law. 
The enforcement policy for Council operated food businesses will be as detailed within the Code however the
standards expected and required are no different to those demanded in private sector premises. 
The Service will adhere to the HSE’s enforcement policy statement in relation to matters of occupational health &
safety. 
SECTION 3: SERVICE DELIVERY 
3.1 Food and Health & Safety Premises Interventions
Page 80 of 204

Page 81

food safety/occupational health & safety service plan 2024/2025 13 
Food Safety
Previously we had a target of achieving at least 96% of all our programmed food inspections. In 2018/19, which was
the last complete year we had pre-pandemic we reached this target. When the Food Law Recovery started in
2021/22, our target was revised to 60% as it was dependent on staff resource available to undertake the Food Law
Recovery Process (FLR). We achieved 87% of planned interventions by the scheduled date. The Interventions Food
Law Code of Practice (Scotland) requires that establishments receive an Intervention no more than 28 days after the
scheduled date, unless they are rated Band E, the lowest possible rating. The scheduled dates for FLR visits are the
latest date by which those interventions should be undertaken and do not have a 28-day grace period. Our
performance in terms of the Code and the Interventions Code is therefore greater than that reported if taking
account of the 28 day grace period for some interventions. Year 1 was a lighter year in terms of food law recovery
and the associated scheduled dates for intervention which allowed us to bring forward some Interventions from Year
2, one of the two heaviest years forecast in terms of FLR. The targets for programmed inspections and performance
achieved are as follows: 
Year Target for Programmed Inspection
to be undertaken by due date
Performance
2022/23 70% 95.9%
2023/24 75% 94.8 % 
The target for 2024/25 for programmed food inspections has been set at 80%.
Business Regulation stepped up to being an ‘early adopter’ of the new Annex 5 pilot scheme and participated in the
implementation group, having formerly worked in partnership with FSS to develop a viable alternative for rating of
food establishments referred to as the Food Law Rating System (FLRS). The FLRS combines the rating systems for
Food Hygiene and Food Standards into one Food Law Intervention scheme based upon a new Food Business
performance model that will target resources on high to medium risk and non-compliant businesses. This impacts
upon the frequency of inspection of food establishments for both hygiene and standards components of what is now
known as a ‘food law’ inspection. The scheme went live to all local authorities on 1 July 2019 which is when we
formally adopted it. 
The FLRS takes account of a food business operator’s track record of compliance and where this is good, they will
receive ‘earned recognition’ influencing the risk rating to reduce intervention frequency. This will assist resources to
be targeted towards businesses which consistently fail to achieve satisfactory standards, and which will be subjected
to sustained and intense enforcement activity. 
This links into our policy for working more efficiently, effectively ensuring that resources are always targeted where
they are most needed. 
In addition, new premises will receive an initial inspection to check that everything is in order and will be risk rated in
accordance with the Interventions Code or the Code, as appropriate for the type of business. The only food
businesses which would not be subjected to proactive inspections are low risk Group 3 Band A premises which
following initial or subsequent intervention or where the food registration form gives sufficient information to make
determination that there is minimal inherent risk, and the Lead Food Officer determines either to place the business
on a 60-month intervention frequency or choose not to undertake a proactive intervention. Questionnaires would
be used to assess ongoing compliance with Group 3 Band A premises, with inspections being carried out only where
deemed necessary. 
Impact of Covid-19
On 17 March 2020, following publicity of Covid-19 cases within a care home located within North Lanarkshire, NLC
food officers stood down inspections initially of premises with a community risk including care homes, hospices,
hospitals, schools, pensioners clubs and prisons, due to Covid-19, then of all other inspections/visits until a policy
Page 81 of 204

Page 82

food safety/occupational health & safety service plan 2024/2025 14 
was formulated with forthcoming advice from FSS. This means that our intervention programme from 2019/2020
was not completed and there was a carry over. Face to face interventions were again stood down late December
2021 to end of January 2022 due to the wave of Omicron variant, except where required to protect public health or
safety and where remote working would not be sufficient. 
Food Law Code of Practice deviations: 
Given the unprecedented nature of the Covid-19 pandemic and national infection control measures introduced in
March 2020, and the anticipated disruption caused by staff shortages, it was recognised that deviation from certain
elements of the Code, and the Interventions Code, would be necessary to ensure Local Authority Environmental
Health Services had the ability to undertake wider public health duties related to Covid-19. LAs received written
confirmation (FSS/ENF/20/006) from FSS that the Minister for Public Health and Sport agreed to allow LAs to deviate
from the Code and the agreement covered the following areas which are considered to be reasonable and
proportionate in the circumstances. 
Food Law Code of Practice deviations included:
a) Food Law interventions to all care facilities including hospitals, care homes, nurseries, and childminders.
b) Planned programmed Interventions at all lower risk Group 2 and 3 businesses within the Food Law Rating
System (FLRS), and all Crown Establishments.
c) Low risk primary production activities - exception for dairy farms supplying raw milk for the manufacture of
raw milk cheese. This includes on farm inspection to assess compliance against primary production controls.
d) Approved establishments and other high risk manufacturers may limit access to high risk production areas.
Therefore, it is recommended that Interventions at Approved establishments, and higher risk FLRS Group 1
businesses, are based on an initial Food Safety Management System and associated documentation audit
followed up by physical inspection only if public health concerns are identified.
e) Intelligence driven Interventions at all food business establishments regardless of category should continue
where possible. Intelligence will include information that suggests fraudulent activity or imminent risk to
public health, e.g., consumer complaints, credible allegations of food poisoning, failed samples of a serious
nature that suggest fraud or health risk. 
The Food Law Code of Practice deviations were then revised and extended to 31 August 2021:
a) Food Law interventions to all care facilities including hospitals, care homes, nurseries, and childminders.
Restricting interventions in this sector will assist with maintaining physical distance requirements and
acknowledges the associated risks to these vulnerable groups.
b) Planned programmed Interventions in all risk levels above a C band across all business groups within the
FLRS and all Crown Establishments.
c) Low risk primary production activities - exception for dairy farms supplying raw milk for the manufacture of
raw milk cheese. This includes on farm inspection to assess compliance against primary production controls. 
It was confirmed with FSS that for interventions of C, D & E premises which were no longer included in deviations
from the Code that we could continue with established practice during the pandemic, i.e., initial remote assessment
(Official Control Verification letter or business questionnaire) with follow up visit being carried out only where
deemed necessary to protect public health. Ongoing demands on Service meant that we adopted this approach for
Band D & Es but did not have the capacity to also adopt for Band Cs due the increased time resource required for
remote assessments and other demands on the Service. 
Food Law Code of Practice deviations recovery plans
FSS and SFELC agreed broad principles on which Local Authority Covid-19 Recovery Plans would be based. A project
to deliver the framework for each Scottish Local Authority to reconfigure or reset its intervention programme was
undertaken by the SFELC Covid-19 Recovery Working Group. The desired outcome of this project was to assist LAs
devise their work programme and help the authority recover from the pandemic. This includes adaption of
Page 82 of 204

Page 83

food safety/occupational health & safety service plan 2024/2025 15 
Intervention Plans to accommodate not only those establishments/interventions which were ‘missed’ during the
Covid-19 lockdown phase but also those which had previously fallen out of scope as a consequence of being missed.
The estimation of staffing resources required is also based on the SFELC Covid-19 Recovery Working Group guidance
for calculating staffing resources. 
The project was designed to facilitate the following by defined completion dates:
• Local Authorities will present a revised Intervention Programme which will operate from a defined date;
• The Intervention Programme shall include all food establishments, each being accorded a revised due
intervention date;
• Every food establishment on the Intervention Programme shall be risk-rated in accordance with the
Interventions Code 2019 Food Law Rating Scheme, except for approved premises and primary producers
which remain under Annex 5 Risk Rating Systems;
• Every Local Authority shall present a Service Plan, incorporating the revised Intervention Programme in
addition to all other responsibilities, in accordance with the current service planning guidance (Note the
forthcoming Administration and Service Planning, Food Law Code of Practice (Scotland) 2020, which had
been expected to be published by December 2022 has been on hold pending a wider project to review and
update the FLCoP as well as the mechanism for updating the Code to support the launch of the Scottish
Authority Food Enforcement Rebuild (SAFER) programme. A draft revised Food Law Code of Practice
(Scotland) is anticipated in summer of 2024).
• Local Authorities shall calculate the total FTE resource required to satisfy the Intervention Programme and
the remainder of the Service Plan by means of an agreed calculation methodology.
It was acknowledged that the project outcomes would highlight some shortfall in available resources at some Local
Authorities. While clear sight of these shortfalls is an essential deliverable of the project, the project scope does not
extend to addressing these deficits in any practical sense. 
Methodology
SFELC convened a short-life working group which delivered the key requirements. All Scottish Local Authorities were
invited to participate and NLC was represented. A FSS Project Team was assembled to support the SFELC Working
Group and provide oversight of progress. The SFELC Working Group had 4 work streams:
1. Desktop Transfer: The initial formula to convert premises on Annex 5 to FLRS.
2. Creation of an intervention programme: Ensuring all FLRS premises are within the revised Inspection
Programme with due intervention dates included.
3. Resource Calculation: Based on the SFELC resource methodology on FSS/SFELC website and refining this to
accommodate current circumstances.
4. Service Planning Guidance: Revising the Service Planning Guidance and using the draft Administration and
Service Planning Food Law Code of Practice.
The outcome of the SFELC Working Group was published in December 2020 ‘Local Authority Recovery Project
Recovery Process Guidance’.
There are Tables with Appendices 3, 4 and 5 which explain the calculation of resource requirements for food law
recovery and programmed interventions. These have been revised in line with FSS/ENF/22/013 that LAs use a 7-hour
day in calculations. The OCV calculation has been calculated in accordance with FSS/ SFLEC OCV Guidance which does
not include travelling time or time allocated to report writing or enforcement activity. For the purposes of the OCV
calculation, 1 FTE officer-day equates to 5 FTE Hours. FSS/ENF/22/013 also includes that food related activity
undertaken by managers, supervisors and Administration should be counted. At 19th June 2024 FSS were going
through the process of drafting guidance on the use of the soon-to-be -published Required Resource Calculator,
scheduled to be issued in 2024 which will incorporate these for future resource calculations. 
Appendix 3- These resource calculations are for a 12-month period, with Year 1 commencing on 1 October 2021.
Page 83 of 204

Page 84

food safety/occupational health & safety service plan 2024/2025 16 
• Appendix 3 Table 1 - Annual Breakdown of Food Law Recovery Plan Interventions Required to Be Carried
Out - details the total number of planned food law recovery interventions to be undertaken within the
maximum time frame after the Intervention Start Date, including Approved Premises and Group 1
Manufacturers. Note there are further details of how these should be spread within that time frame
depending on Priorities within FSS and SFELC Recovery Process Guidance. 
• Appendix 3 Table 2 - Food Law Interventions Recovery - Officer FTE Resource Calculation Per Intervention
Category (Recovery Visits Only) - details the Officer FTE resource estimated to deliver the food law recovery
interventions only. NB - this does not include other interventions in addition to food law recovery
inspections during this period. 
• Appendix 3 Table 3 - Estimate of Timescales and Numbers for Food Law Recovery Intervention and First
Next Programmed Intervention After Food Law Recovery Intervention - this is a breakdown of the number
of food law recovery interventions and first recurring risk assessed intervention per group and band which
require to be scheduled across the five years of the recovery period.
• Appendix 3 Table 4 - Calculation of Resources Required for First Next Programmed Intervention After Food
Law Recovery Intervention - this only takes into account the first recurring risk assessed programmed
intervention, following the Food Law Recovery Intervention and Officer FTE resource estimated to deliver it.
It does not account for further recurring risk assessed programmed interventions e.g., those at 12, 18 or 24
intervention intervals which might fall again within the 5-year recovery period. Nor does the figure include
projected Band E intensive 1-month interventions and Band D intensive 3 month interventions, revisits and
new premises inspections. 
• Appendix 3 Table 5 - Combined Estimate FTE Resource Calculation Per Annum for Food Law Recovery and
PI Interventions - details likely timescale for when next programmed inspection will be due after food law
recovery inspection and the Officer FTE resource estimated to deliver the food law recovery interventions
and next programmed interventions after food law recovery intervention. It does not include projected
Band E intensive 1-month interventions and Band D intensive 3 month interventions, the anticipated uplift in
enforcement action, revisits and visits to new premises registering from 1 October. 
• Appendix 3 Table 6 - Summary of FTE Base Resource Needed to Meet FLRP+ First Recurring PI Thereafter -
this is a summary of FTE resource needed to meet the Food Law Recovery Plan and the first recurring PI
thereafter only. It does not include projected Band E intensive 1-month interventions and Band D intensive 3
month interventions, the anticipated uplift in enforcement action, revisits and visits to new premises
registering from 1 October.
• Appendix 3 Table 7 - Estimate of Minimum FTE Resource Requirement for Revisit Interventions - this is a
summary of FTE resource needed to meet the revisit requirement of Food Law Recovery Plan and the first
recurring PI thereafter only. This resource calculation is based on a 1-hour revisit for every intervention
averaged out across the 5 years. Whilst some premises will not require a revisit, others will require longer
revisits or multiple revisits. It was intended to bring forward year 2 visits into year 1 if there was capacity.
This Table does not include revisits to projected Band E and D intensive 1 month and 3-month interventions.
The purpose of revisits is to monitor non-compliant standards arising from the initial inspection and/or
matters of evident concern. 
• Appendix 3 Table 8 - Additional Food Law Interventions Arising from Poor Compliance and From New
Businesses Year 1 Estimate Only - poor compliance interventions relate to a minimum frequency of re-
intervention of 1 month, followed by 3 months, after service of formal notices or serious non-compliance.
This is a summary of FTE resource needed to meet Year 1 projected 78 Band E intensive 1-month
interventions (based on total numbers of Remedial Action Notices and Voluntary Closure Agreements during
2018-19 and an anticipated 200% uplift in enforcement action due to the pause in interventions) which at
Page 84 of 204

Page 85

food safety/occupational health & safety service plan 2024/2025 17 
best will result in a further 78 subsequent Band D 3 month interventions. This is during a 12-month period
until 30 September 2022. These are estimated as Group 2 Band D & E resource requirement.
The number of anticipated new businesses interventions is based on previous annual figures and are
estimated as Group 2, Band C, average resource requirement.
• Appendix 3 Table 9 - Estimated Resource Required for Formal Food Enforcement Notices - this is a
summary of FTE resource needed for formal food enforcement notices served in a typical year pre-Covid
(2018-19). 
• Appendix 3 Table 10 - Service Requests Resource Summary-Based on A Typical Year Pre-Covid (2018-19)-
details Officer FTE resource estimated to deliver service requests for the range of functions undertaken by
Business Regulation in a typical year pre-Covid (2018-19) 
• Appendix 3 Table 11 - Miscellaneous Foreseeable Additional Demands on Service Resource - details Officer
FTE resource estimated to deliver additional demands on Service not included elsewhere. Please note that in
respect of FHIS Uploads included in this table, although there is some input required from officers, there is
an ongoing demand on Business Regulation Managers’ resource to undertake the main body of this work
which reduces the burden that would otherwise be placed on officers. Excluded from this table is, for
example, work related to COVID-19 pandemic, food poisoning outbreaks and reports to the Crown as these
are impossible to quantify.
Excluded also is the service provided by Support to redact and publish food law intervention letters on NLC
website following planned programmed inspections and revisits.
•  Appendix 3 Table 12 - Estimate of Resources Required to Deliver Business Regulation Service Across The
Food Law Recovery Period (Oct 2021-Sep 2026) - details Officer FTE resource estimated to deliver demands
on Service. This is a conservative figure. Formal Food Enforcement Notices are based on numbers served in
2018-19 of which there are anticipated to be more during the food law recovery period. Food Law
Interventions arising from poor compliance have been included only for Year 1. Excluded also is, for
example, work related to COVID-19 pandemic, food poisoning outbreaks and reports to the Crown as these
are impossible to quantify. 
Appendix 4 – Updated Tables of Calculations and Information Relating to Staff Resources for Service Plan 2024-
2025 including Year 4 of Food Law Recovery Plan commencing 1 October 2024. 
• Appendix 4 Table 1 - Annual Breakdown of Food Law Recovery Plan Interventions Required to Be Carried
Out- details the total number of planned food law recovery interventions to be undertaken within the
maximum time frame after the Intervention Start Date, including Approved Premises and Group 1
Manufacturers. Note there are further details of how these should be spread within that time frame
depending on Priorities within FSS and SFELC Recovery Process Guidance. 
• Appendix 4 Table 2 - Food Law Interventions Recovery - Officer FTE Resource Calculation Per Intervention
Category (Recovery Visits and New Premises Only) - details the Officer FTE resource estimated to deliver the
food law recovery interventions only. Note this does not include other interventions in addition to food law
recovery inspections during this period. 
• Appendix 4 Table 3 - Estimate of Minimum FTE Resource Requirement for Revisit Interventions - this is a
summary of FTE resource needed to meet the revisit requirement of Food Law Recovery Plan and the first
recurring PI thereafter only. This resource calculation is based on a 1-hour revisit for every intervention
averaged out across the 5 years. Whilst some premises will not require a revisit, others will require longer
revisits or multiple revisits. This includes some year 2 visits being brought into year 1 where capacity exists.
This Table does not include revisits to projected Band E and D intensive 1 month and 3-month interventions.
Page 85 of 204

Page 86

food safety/occupational health & safety service plan 2024/2025 18 
The purpose of revisits is to monitor non-compliant standards arising from the initial inspection and/or
matters of evident concern.
• Appendix 4 Table 4 - Estimate of Resources Required to Deliver Business Regulation Service Across the Food
Law Recovery Period (Oct 2021-Sep 2026) - details Officer FTE resource estimated to deliver demands on the
Service. This is a conservative figure. Formal Food Enforcement Notices are based on numbers served in 2018-
19 of which there are anticipated to be more during the food law recovery period. Food Law Interventions
arising from poor compliance have been included only for Year 1. Excluded also is, for example, work that was
related to COVID-19 pandemic, food poisoning outbreaks and reports to the Crown as these are impossible to
quantify. 
The estimated resource requirement is under ongoing review. The calculations remain as detailed in the
appendices as we are awaiting information from FSS on the outcome of a further Time Management Exercise
(TME) involving Local Authorities. At June 2024, we are still within Year 3 of the Intervention Programme Start
Date. 
• Appendix 5 - Premises Outwith Food Law Rating - Calculation of Required Annual Resource (June 2024) -
Approved Premises, High-Risk Group 1 Manufacturers and Primary Producers.
This details Officer FTE to deliver interventions of Approved Premises and High Risk Group 1 Manufacturers based on
Official Control Verification (OCV) principles and other business still operating under Annex 5 (Food Hygiene and
Food Standards), except those approved by FSS and for which we deal with Food Standards only and are included
within Appendix 3 Table 11. High Risk Group 1 manufacturers continue to fall within the food law rating scheme. Due
to other demands on the Service, the roll out of OCV for these premises has not been implemented. Food law
interventions undertaken for the high risk Group 1 manufacturers during 2024/25 will not utilise the OCV audit
process, except where deemed appropriate. It is anticipated that these premises will receive interventions based on
OCV principles and methods of the OCV when resources permit. The calculation for the High Risk Group 1
Manufacturers in Appendix 5 is not included in the annual average as it is not intended to utilise the OCV audit
process for them during 2024/2025. 
At June 2024, Year 3 of Food Law Recovery is still ongoing. Food Law interventions are combined interventions
covering both food hygiene and food standards interventions. The resource calculation has been reviewed but
remains a conservative figure. Due to Year 2 being a heavier year in terms of food law recovery inspections than Year
1, we brought forward interventions due within 18 months to Year 1, where capacity existed. Due to Year 4 being a
heavier year in terms of food law recovery visits than Year 3, we have and will continue to bring forward
interventions into Year 3, where capacity exists. Due to environmental health vacancies and recruitment issues
within another part of Protective Services, officers within Business Regulation provided assistance with public health
service requests for 8 months from September 2023 to April 2024, and which affected capacity for Year 4 FLR visits to
be brought forward. The estimated inspection activity for Year 4 (commencing 1 October 2024) is summarised below.
Note the number of food law interventions due to end of Year 4 FLR (30/9/25 ) exclude those which have already
been brought forward into year 3 FLR at 2 July 2024. 
Estimated Inspection Activity Sub-Totals Total
Number of Food Law Interventions due to end of
Year 4 FLR 30/9/25
(This does not take into account revisits,
new premises visits or formal actions)
1682
Additional Food Law Interventions Arising from Poor
Compliance and From New Businesses (Appendix 3
Table 8)- projected Band E intensive 1month
interventions based on total numbers of Remedial
Action Notices and Voluntary Closure Agreements
during Year 2 FLR 2022 - 2023 which at best will result
in subsequent Band D 3-month interventions 
21 Band E & 21 Band D  42
Page 86 of 204

Page 87

food safety/occupational health & safety service plan 2024/2025 19 
secondary food law inspections (or revisits). The
purpose of revisits is to monitor non-compliant
standards arising from the initial inspection and/or
matters of evident concern. Resource calculations
for revisits for Year 1 (12 months) average over 5
years is recorded in Appendix 3 Table 7 to estimate
for Year 4
1,815 1815
New Premises Inspections -Premises currently
registered and awaiting inspection
42 42
Total Total -1899 3581 
Our average annual number of revisits to check on non-compliance over 2016 to 2019 was 1,218 (991 food hygiene
and 227 food standards). The revisits we undertook in 2019/2020 were 461 food law, 172 food hygiene and 27 food
standards. For Year 1 Food Law Recovery (October 21-September 22), we undertook 549 revisits to food premises
(food law, food hygiene and food standards). For Year 2 Food Law Recovery to date (October 22 to March 23), we
have undertaken 608 revisits to food premises (food law, food hygiene and food standards). For The first 6 months of
Year 3 Food Law Recovery (October 2023 to March 24) , we have undertaken 256 revisits to food premises (food law,
food hygiene and food standards). This figure excludes revisits to investigate complaints.
Our average annual number of new premises visits over 2016 to 2019 for food hygiene was 208 and for food
standards is 207. The new premises inspections we undertook in 2019/2020 were 190 food law, 63 food hygiene and
62 food standards. It was expected that due to the anticipated increase in enforcement action, the number of
revisits required in Year 1 would be at a higher rate in comparison to Interventions undertaken than in previous
years, with the resource required to deliver this being calculated over a 5 Year average in Appendix 3 Table 7. Not
included here are any unpredictable or ad hoc interventions, for example, responding to consumer concerns over
poor cleanliness or structural conditions, hygiene malpractices or unsatisfactory foods prepared or sold locally.
The number of new premises which opened during Year 1 FLR 2021/2022 was 181. This was additional to 275 new
premises which opened from 1 April 2020 to 31 August 2021 when food inspections had been suspended. The
number of new premises which opened during Year 2 FLR (October 22-September 23) was 227. At 28th June 2024 all
but 42 have been inspected. These have been scheduled for inspection. As many register in advance of the 28 days
statutory period, new premises inspections cannot be undertaken as the business isn’t yet trading.
When a food premises registration form (FPRF) is received by the Service, it is recorded as a Service Request. From
that Service Request, the establishment will be created on the Service’s MIS and a Scheduled Inspection for it
created 28 days from the date the FPRF is received. As such the scheduled inspections for new establishments are
incorporated into the Service’s monthly inspection plans. 
The new FLRS places more emphasis on previously under enforced food standards matters and is therefore more
resource intensive. 
In addition, the Service has continued with the rollout of the OCV audit process for approved premises. Training
rolled out by FSS on this to ensure that officers can robustly challenge documentation provided by food business
operators was delivered in 2022. The OCV checklist had been used to undertake desk top assessments of Group1
businesses, including manufacturers in line with Food Law Code of Practice deviations permitted by The Minister for
Public Health and Sport. 
The OCV approach has been developed to ensure that the verification of a food control management system (FCMS)
during an official control inspection is systematic, structured and scientific. It also ensures that the FCMS is verified
both in terms of its validation and implementation. Implementation of this new process will significantly increase the
time spent on official control visits at approved establishments.
Page 87 of 204

Page 88

food safety/occupational health & safety service plan 2024/2025 20 
Food law interventions undertaken for the high risk Group 1 manufacturers during 2023/24 did not utilise the OCV
audit process, except where deemed appropriate.
Food law interventions undertaken for the high risk Group 1 manufacturers during 2024/25 will not utilise the OCV
audit process, except where deemed appropriate. 
The total numbers of inspections undertaken since FLR commenced on 1 October 2021 ( notionally started 1
September 2021) are: 
Year
FLR
Dates Food Law Food Hygiene Food Standards Total
1 01/09/2021-30/09/2022 1291 31 23 1345
2 01/10/2022-30/09/2023 1723 42 38 1803
3 01/10/2023-31/03/2024
( 6 months only)
812 12 11 835
TOTAL     3983 
With regard to the inspection of food premises outwith normal working hours, our policy is to ensure that, where
premises are only open out with normal hours, appropriate provision is made for them to be inspected in accordance
with at least the minimum number of visits determined by their risk rating.
Health & Safety 
There is a Statement of commitment between Local Authority and HSE Regulatory Services which sets out our shared
vision for an ongoing LA/HSE co-regulatory partnership available via https://www.hse.gov.uk/lau/statement.htm
and which is appended to this Service Plan. 
In our interventions, we will respect the key provisions of the National Local Authority Enforcement Code. Priority
action is resource dependent and will focus on matters pertinent locally. 
Fuller details of the occupational health & safety targets and objectives are prescribed in the report’s Appendix 1 and
are subject to adequate resources.
Other projects may be added where they present nationally via the HSE, regionally from the West of Scotland Health
& Safety Liaison Group meetings or within North Lanarkshire through local intelligence. 
During 2023/2024, we continued 2 projects for proactive inspections based on national intelligence:
(i) High Volume Warehousing/Distribution in respect of poorly managed workplace transport.
(ii) Industrial retail/wholesale premises in respect of poorly managed workplace transport/work at height/cutting
machinery/lifting equipment. 
We also undertook one project for pro-active inspections based on local intelligence involving tanning salons
focussing on measures in place to monitor and validate that the necessary control measures are being implemented
to minimise the risk to the health of persons using the tanning equipment or in the immediate vicinity of tanning
equipment whilst it is operating. 
When food inspections are carried out, where relevant, gas safety, electrical safety and solid fuel appliance checks
are undertaken. We have incorporated within our food safety letter templates information relating to health and
safety topic information relating to :
• Welfare provision for delivery drivers;
• Work related road safety;
Page 88 of 204

Page 89

food safety/occupational health & safety service plan 2024/2025 21 
• The need to prevent injury to members of the public from accessing large commercial waste and
recycling bins;
• Work related stress and mental health campaign ‘Working Minds’.
This has resulted in an excess of 1800 letters being sent containing this information to raise awareness of these key
topics. 
It is estimated that 2.8 FTE of warranted officers time is spent on Health and Safety (based upon previous years’
intervention findings). 
3.2 Food and Food Premises Complaints
The Authority’s policy regarding the investigation of food complaints and food premises complaints is detailed in the
Service’s Food and Food Premises Complaints Policy and Food Complaints Standard Operating Procedure (SOP) are
within scope of the Service Delivery Procedure QAP 5.3 (Business Regulation) within the ISO 45001 compliant
Occupational Health and Safety System. The Service intends to seek to maintain the performance target for
investigating food and food premises complaints by commencing the investigation of a minimum of 90% of high risk
food and food premises complaints within two working day’s notification and of low risk food and food premises
complaints within 5 days. 
In addition, we will observe the advice contained within LACORS guidance on food complaints and liaise with
home/primary and/or originating authorities. 
During the COVID-19 pandemic, many food businesses changed their operation, now having a greater presence on
social media/digital platforms and therefore wider distribution. In addition, it is anticipated that there is an
increased number of establishments under new ownership or management. As such it is more difficult to predict the
number of food and food premises complaints anticipated during 2024/2025. 
Our average annual number of consumer complaints is 307 based on the last three years prior to 1 April 2020. These
complaints may relate to the nature, substance or quality of foods, the condition of the businesses from where the
foods were made or sold or the malpractice of food business operators. It was estimated that during 2022/23, we
would deal with 300 consumer complaints, including ‘Other Food’ jobs logged. During 2022/23, we dealt with 248
Food and Food Premises Complaints, and 77 ‘Other Food’ service requests, totalling 325. During 2023/24 we
anticipated we will deal with numbers similar with those experienced in 2022/23. During 2023/24, we dealt with 216
High Risk Food and Food Premises Complaints and 20 Low Risk Food and Food Premises Complaints, and 76 ‘Other
Food’ service requests, totalling 312. They vary in complexity and the time required to complete our enquiries and
can require corroboration increasing resource demand. 
Food and Food Premises Complaints are only a fraction of the overall Service Requests dealt with by the Service.
During 2020/2021 there were 2,600 service requests were dealt with by Business Regulation, which was 33% more
than the annual average from 2017/2018 to 2019/2020. During 2022/2023, Business Regulation dealt with 1,997
service requests, and in 2023/20204, dealt with 2,020 service requests. Over the last 2 years, the numbers of service
requests dealt with by Business Regulation is marginally higher than the annual numbers received in a typical year
pre-Covid (2018/2019 – 1,954 Service Requests in Appendix 3 Table 7 Service Requests). 
The estimate of anticipated resource required to process Food and Food Premises Complaints, including ‘Other Food’
service requests in a typical year is recorded in Appendix 3 Table 7 Service Requests. 
3.3 Home Authority Principle/ Primary Authority Partnerships 
This Authority supported the LACORS principle of the home authority which has undergone review. We do not act as
Home Authority for any businesses within the food sector. Home Authority agreements exist with other UK local
authorities and for which we continue to liaise with those authorities where appropriate. There are currently no
Page 89 of 204

Page 90

food safety/occupational health & safety service plan 2024/2025 22 
Primary Authority Partnerships in place in North Lanarkshire. Where businesses have Primary Authority Partnerships
(PAPs) with other local Authorities, inspection plans and guidance published by the PAP will be considered and as a
matter of course there will be liaison with the PAP if formal enforcement action is considered. 
The Primary Authority Scheme does not apply in Scotland with regard to Food Law. Collaboration and a good
working relationship between local authorities and the Primary/Home Authority is encouraged by FSS and is
undertaken by this Authority as per the Code. As such matters of legal interpretation and consistency in relation to
enforcement of a business within NLC and which may have implications for their business premises outwith our area
will be discussed with colleagues in the appropriate regional or local food liaison group and the Home Authority and
/ or Originating Authority, if appropriate. Unilateral decisions on interpretations will be avoided without first seeking
the views of other Food Authorities, the Scottish Food Enforcement Liaison Committee (SFELC) or in relation to
England the Local Government Association (LGA). 
Notwithstanding this, advice and guidance is given freely, where requested, to food traders and numerous enquiries
are dealt with from other Authorities throughout the UK in accordance with the following broad principles:
• Special emphasis is placed on the monitoring of goods and services originating from this area.
• Guidance and advice are given to businesses on food safety matters.
• Enforcement action makes provision for liaison with Other Authorities, where appropriate. 
3.4 Advice to Businesses
Free advice is normally given to food safety and occupational health & safety businesses following routine
interventions and/or in response to separate enquiries. 
There is also a partnership agreement with Business Gateway to offer free advice to start up and ‘fledgling’
businesses who choose to locate within North Lanarkshire. This was stood down due to pandemic as it is reliant on
information being furnished by Business Gateway, but we anticipate that this will resume as part of business
recovery. 
We work in partnership with the Enterprise Team who award Business Improvement Grants to help identify new or
existing businesses with which we may have an interest and provide advice as appropriate. 
We regard the advice given by our Officers as being an important part of our role as a regulator in helping businesses
to understand what is required and what good practice looks like. 
We are keen to ensure that all this work is undertaken to the highest possible standard and, wherever possible,
improve the level of customer service. As part of this process, customer satisfaction questionnaires were sent to all
businesses following a routine intervention. This was stood down during the Pandemic and has since been reviewed
to digitise the process. The new digitised process, which will commence during 2024/2025, includes a QR code and
online survey link being added to templates of our standard letters so they will be included in correspondence
issued to all food establishments after routine intervention. This will ascertain the perceived level of customer
service and afford the recipients of our service an opportunity to make their views on the level of customer service
we provide known to us. By doing so, we also commit to improve our standards where we can. 
Business Regulation use mailshot email communications with business for relevant matters arising e.g., during
2021/2022 for introduction of new legislation relating to food prepacked for direct sale (Natasha’s Law), during
2022/2023 to raise awareness of Listeria monocytogenes in cold cuts of meat and smoked fish amongst butcher's
premises and care homes respectively and during 2023/2024 to raise awareness amongst relevant businesses of
industry guidance relating to the sale of slush ice drinks in response to adverse health effects experienced by young
children after consuming slush iced drinks.
Page 90 of 204

Page 91

food safety/occupational health & safety service plan 2024/2025 23 
Our average number of business advice requests was 195 based on the last 3 years prior to Covid. We have seen a
reduction in the number of business advice requests received over the last couple of years. During 2021/2022 we
received 163, during 2022/2023 we received 113 and during 2023/2024 we received 62. It is anticipated this
demand will be ongoing. These vary in complexity and time required to complete. As such it is difficult to accurately
assess resource implications.
Customer service satisfaction questionnaires were previously dispatched to a proportion of all other service users
where a request has been logged on our computer system. This included food product and food business premises
complaints, infectious disease investigations, health & safety issues and complaints and enquiries from members of
the public. This was stood down during the Pandemic and has since been reviewed to digitise the process. The new
digitised process, which will commence during 2024/2025, includes an online survey link being added to the NLC
website. 
3.5 Food Inspection and Sampling 
The policy of this Authority is to have an effective routine sampling programme where the principal aim is to assist in
protecting the public and to meet relevant statutory obligations.
The main thrust of the sampling programme is to focus on high risk food premises and on local manufacturers. The
Council also participates in sampling initiatives agreed by the West of Scotland Food Liaison Group.
The analysis or examination of food and water samples is conducted by Glasgow Scientific Services who are also
consulted with regard to the nature and range of samples proposed to be taken each year in accordance with the
requirements of the Food Law Code of Practice (Scotland). 
Whilst our annual Sampling Programme for 2024/2025 has still to be completed, it will continue to be a risk based
approach and will be undertaken in accordance with our Sampling Policy. It will focus on high risk premises within
North Lanarkshire and is based on local priorities, as well as national priorities recommended by FSS, SFELC and
projects agreed within West of Scotland Food Liaison Group. The FSS funded sampling programme co-ordinated by
GSS across LAs within the West of Scotland Food Liaison Group and which focuses on potentially emerging issues has
commenced. 
Note: The number of samples taken will be determined by resource availability and priorities for the year.
3.6 Control and Investigation of Communicable Disease including Outbreaks and Food Related Infectious Disease
This Authority works with NHS Lanarkshire Public Health to the national guidance by Scottish Health Protection
Network on management of public health incidents and management of foodborne illness for the investigation of
public health incidents and control of food poisoning. This is an important document which acts as a reference point
for assisting in the investigation and control of public health outbreaks and incidents. Desktop exercises to ‘test’
plans, working in partnership with South Lanarkshire Council and NHS Lanarkshire Public Health have been useful in
the past and are likely to be repeated. 
Our average annual number of confirmed cases of food poisoning notified is 106 based on three years prior to 1 April
2020. In 2020/21, 40 cases of food poisoning were reported to this Authority by NHS Lanarkshire, which is a
significant drop in previous years. In 2021/22, 47 cases of food poisoning were reported to this Authority by NHS
Lanarkshire which is 17.5% increase from the previous year. In 2022/23, 87 cases of food poisoning were reported to
this Authority by NHS Lanarkshire. This is an 85% increase on the previous year. The number of notifications was
anticipated to continue to increase to pre-pandemic average levels due to the return of international travel. In
2023/2024, 114 cases of food poisoning were reported to this Authority by NHS Lanarkshire seeing a return to
around the pre-pandemic annual average. The Service seeks to maintain that a target of a minimum of 94% of
infectious disease cases will be responded to within the time frames stated within the NHSL Epidemiological
Page 91 of 204

Page 92

food safety/occupational health & safety service plan 2024/2025 24 
Investigation Protocol. During 2023/24, we responded to 100% of these within timeframe. The estimate of
anticipated resource required to process IDs based on a typical year is recorded in Appendix 3 Table 7 Service
Requests. 
3.7 Food Safety Incidents
These are dealt with in accordance with the procedures detailed in the Food Law Code of Practice (Scotland). An out
of office hours stand by service is maintained to respond to emergencies including Food Alerts for Action (FAFA)
issued through Food Standards Scotland’s warning system. 
No FAFA were received from FSS in 2018/2019 to 2022/2023. One FAFA was received during the 1st quarter of
2023/2024 which involved considerable staff resource. It is estimated that that we will receive no more than 5 Food
Alerts For Action from FSS during 2024/25.
During 2021/2022 we dealt with 10 Food Safety Incidents and Investigations in partnership with FSS. These are an
intense use of officer resource requiring input from multiple officers and management working in partnership with
the FSS Food Crime and Incidents Unit, with implications across Scotland and UK. This number is far greater than
previously experienced and forecast but is difficult to predict. During 2022/2023, we dealt with 7 Food Safety
Incidents and Investigations. One related to food retailed within NLC but manufactured within another LA. During
2023/2024, we dealt with 5 Food Safety Incidents and Investigations all relating to food manufactured outside North
Lanarkshire but delivered to premises within. It is estimated that in 2024/2025 we will deal with no more than 10
Food Safety Incidents and Investigations in partnership with FSS. 
The estimate of anticipated resource required to process Food Safety Incidents in a typical year is recorded in
Appendix 3 Table 8 - Miscellaneous Foreseeable Additional Demands on Service Resource. 
Food Safety Incidents may be linked with Food Crime and Fraudulent Activities, Paragraph 3.10. 
3.8 Liaison with Other Organisations
To ensure a consistent approach to enforcement action with neighbouring local authorities, North Lanarkshire is
represented in the West of Scotland Food Liaison Group (WSFLG) and the West of Scotland Health & Safety Liaison
Group (WSHSLG). During 2023/2024, North Lanarkshire was also a WSHSLG representative on the Health and Safety
Co-ordinating Group Scotland (HASCOG), a group which co-ordinates health and safety enforcement. NL was
represented at SFELC Seafood Working Group for a Scottish solution to Export Health Certification requirements for
Scottish Seafood Industry in preparation for our exit from EU in respect of fish exporters. 
Internally, the Service liaises with Planning and Building Standards to ensure responses to planning and building
warrant consultations are responded to within timeframe. The control of ventilation within the workplace is one of
the key mitigations in control of Coronavirus. It is therefore anticipated that ventilation requirements within new
builds will be of key consideration in both planning and building warrant consultations on which this Service will be
consulted. This Service also liaises with Licensing to ensure the same for licensing consultations and provides Section
50 Certification for premises confirming they meet with the structural requirements of food legislation. The Service
is also represented on NLC’s Safety Advisory Group (SAG) which co-ordinates and considers event applications to
NLC. As previously stated, NLC works in partnership with NHS Lanarkshire and South Lanarkshire Council and has
produced a Joint Health Protection Plan for the Lanarkshire area. This is an important document which acts as a
reference point for assisting in the investigation and control of public health outbreaks and incidents. Although the
pandemic greatly increased our level of interaction between NHS Lanarkshire Public Health, liaison meetings with
NHS Lanarkshire were always held on a regular basis and will continue to be so.
Page 92 of 204

Page 93

food safety/occupational health & safety service plan 2024/2025 25 
The estimate of anticipated resource required to process services requests in respect of liaison with other
organisations and internally is recorded in Appendix 3 Table 7 - Service Requests - Based on a typical year pre-Covid
(2018-19). Table 7 does not include provision of mutual aid. 
3.9 EU Exit
Of greatest concern in respect of the impact of EU exit was the Scottish food export market and in particular fish and
shellfish. North Lanarkshire has two major fish exporters within its boundary. Prior to 1 January 2021 there was no
need for export health certificates (EHCs) for export of such produce to the EU, however this changed due to EU exit
which in short means that each individual consignment of fish/ shellfish requires an individual EHC. Export
Certification Hubs such as those within North Lanarkshire reduced the impact of EHCs required and therefore
associated charges. This was foreseen to place a very significant burden on those LAs in which they are situated and
who were unable to resource it from current staffing resources without a very significant and detrimental impact to
other public health roles and to the Local Authorities statutory functions. In July 2020, Scottish Government
determined that provision of EHCs at the Hubs would be overseen by FSS and not LAs. 
North Lanarkshire Council formally offered mutual aid to FSS in respect of fish export hubs located within the district,
effective from 1 January 2021. This was to ensure adequate resource was in place at the hubs to issue Export Health
Certificates and thereby prevent exports being adversely hampered by the pandemic. Although this has not been
called upon, the mutual aid for other agency partners remains in place. 
The Hub model requires risk-based certification of fishery products and live bivalve molluscs which required
originating authorities, including North Lanarkshire, to provide attestations of compliance of supplier premises to
Food Standards Scotland which oversees the hubs. These are done in at least 6 monthly intervals and require
ongoing OCV audit of supplier premises. 
We have also provided support and guidance to other approved premises and manufacturing premises which export
to assist with the complex EU exit rules which now exist. These can involve complex considerations following export
issues at Border Control Posts and can require liaison with both FSS and Department of Environment Food and Rural
Affairs (DEFRA). 
The Windsor Framework has alleviated the potential impact of the original NI Protocol in respect of exports of
Products of Animal Origin to Northern Ireland. 
3.10 Food and Health & Safety Promotion
We aim to continue to give our full support in 2024/2025 to Food Standards Scotland’s Eat Safe Initiative. The
scheme consists of an award granted by Councils to specific categories of food businesses within the scheme which
meet standards of hygiene in excess of that required by current food hygiene legislation. 
This scheme provides a recognisable sign of excellence in food hygiene. It is intended to promote the scheme,
wherever possible, to encourage as many food businesses as possible to attempt to obtain and retain the award thus
helping to drive up food safety standards within North Lanarkshire. 
We had worked in partnership with the Scottish Government and NHS Health Scotland to promote the Healthy
Living Award via our website. The Healthy Living Award was paused due to Covid-19 Pandemic and is not being
restarted. A new eating out, eating well framework is being developed by Public Health Scotland to help
businesses offer healthier food options.
We will also continue to work with the Scottish Centre for Healthy Working Lives to promote health & safety in small
and medium sized businesses within North Lanarkshire. (This was stood down due to the pandemic, but we will
resume liaison as part of business recovery.)
Page 93 of 204

Page 94

food safety/occupational health & safety service plan 2024/2025 26 
And we will work with the HSE to promote national priority topics and campaigns. 
It is difficult to accurately assess resource implications for the initiatives and promotional work which we aim to
undertake during 2024/2025. It is also difficult to identify measures that will be used to evaluate the effectiveness of
these. 
3.10 Food Crime and Fraudulent Activities 
Activity that is classed as Food Fraud and / or Food Crime can be described as serious dishonesty that impacts
detrimentally on either the safety or the authenticity of food. Food Fraud is a dishonest act or omission, relating to
the sale or preparation of food, which is intended for personal gain or to cause loss to another party. Food Crime
(serious Food Fraud) is considered to be serious or complex fraud or serious and dishonest regulatory
non-compliance in relation to food, drink and animal feed. 
Upon suspicion of Food Fraud, action shall be taken as set out within the Service Food Incidents, Alerts, Food Fraud &
Food Crime Policy and Standard Operating Procedure, which are aligned with the Code. There is an anticipated
increase in food crime and fraudulent activities as a result of our exit from the EU. These are an intense use of
officer resource requiring input from multiple officers and management working in partnership with Food Standards
Scotland Food Crime and Incidents Unit, and across other local authorities. The estimate of anticipated resource
required to process Food Crime in a typical year is recorded in Appendix 3 Table 8 -Miscellaneous Foreseeable
Additional Demands on Service Resource.
Food Crime and Fraudulent Activities may be linked with Food Safety Incidents, Paragraph 3.7. 
3.12 Other Demands on Service
During 2022/2023 there were 1,997 service requests, and during 2023/2024 there were 2,020 service requests dealt
with by Business Regulation. This has seen a return in the last 2 years to annual numbers received in a typical year
pre-pandemic. 
In October 2022, FSS announced the launch of the Scottish Authority Food Enforcement Rebuild (SAFER) programme
to develop the future model for delivery of official controls. It is to be a collaborative approach involving FSS, Local
Authorities and Scottish Government. It is recognised that, for a number of years, across Scotland there has been a
decline in FTE Food Officers but an increase in demands placed upon them due to changes in food premises and
increased demands due to the new Food Law Rating Scheme. Local Authorities are being asked to free up resource
to assist with its development. 
The SAFER themes and workstreams include:
Resourcing- Qualifications and Competency
Digitalisation-Centralised Database & Dynamic Delivery
Food Law Delivery-Interventions & Charging 
North Lanarkshire Council Business Regulation staff have already attended SAFER events to contribute to the
programme and are already engaging with FSS. 
To assist with succession planning , North Lanarkshire Council continue to train student Environmental Health
Officers and have committed to offer a training position each year to a student studying Environmental Health at
University of the West of Scotland, during their 3rd year and following graduation, to provide the practical training
required for them to be presented for examination for the professional qualification required for Environmental
Health Officers.
Page 94 of 204

Page 95

food safety/occupational health & safety service plan 2024/2025 27 
SECTION 4: RESOURCES
4.1 Financial Allocation 
The cost of operating the food safety service is estimated at £1,206,160. This is based on 80% of Business Regulation
staff resource being spent on Food Safety (and is inclusive of the annual SLA charge for GSS which is utilised across
other NLC services and is £293,538 this financial year).
There is no specific financial provision for any legal action necessary as part of our enforcement function as this is
provided within the Council by its Legal & Democratic Solutions Service.
4.2 Staffing Allocation 
The current Business Regulation Service staff establishment is as follows: 
• Protective Services Manager (Non-operational and shared with Pollution Control & Public Health and Trading
Standards)
• Assistant Business Manager (Business Regulation) who is also Lead Food Officer
• 3 Senior FTE Environmental Health Officers
• 14.5 FTE Environmental Health Officers
• 2 FTE Food Safety Officer (FSO) 
The main changes to staffing allocation since 2023/2024 Service Plan is: 
• The vacant FSO post for which recruitment was underway in June 2023 has been filled. This post had
changed on the establishment from an EHO to an FSO due to difficulty in recruiting an EHO for a post
vacated late 2022. 
The Service is jointly responsible for food safety and occupational health & safety issues. Consequently, staff have a
dual role, but flexibility is applied whereby staff resources will be used wherever there is most need and this will be
kept under review. 
The Food Law Code of Practice (Scotland) 2019 details competency and authorisation levels of Authorised Officers of
Food Authorities who carry out interventions, in line with Regulation (EC) No 882/2004. Authorisation Levels are
published on NLC’s website. EH and FSO competency and authorisation levels in June 2024: 
Designation Number of FTE Officers Certifying Support Officer
Competency
EHO >2 Years Food Experience 13 N/A
EHO <2 Years Food Experience 1.5 N/A
FSO >2 Years Food Experience 2 N/A
Total 16.5 0 
The anticipated increase in our inspection activity due to the progressive implementation of the Food Law Rating
Scheme and intended roll out of OCV for approved premises and high risk Group 1 manufacturers placed doubt over
North Lanarkshire Council’s resource capability to deliver its estimated inspection activity in 2019/2020. This
resulted in the creation of an additional 2 FTE permanent EHO posts in November 2019. A review of Business
Regulation Management Resource undertaken in August 2020 led to the creation of a third SEHO post and the
deletion of a front line EHO post. Following approval at the Workforce Steering Group on 23 July 2021 for an
Page 95 of 204

Page 96

food safety/occupational health & safety service plan 2024/2025 28 
additional 3 temporary EHOs/FSOs to assist with COVID recovery, recruitment campaigns for temporary staff were
unsuccessful. This resulted in the deletion of these 3 temporary posts and the creation of 2 FTE Environmental
Health Officer posts as permanent additions to the establishment within Business Regulation early in 2022. 
The FSS Resource Methodology Guidance was utilised to identify any potential shortfall in our staffing complement.
Programmed food law Interventions resumed on 1 September 2021 following the Desktop Transfer and revised
Intervention Programme. However, for performance monitoring and reporting purposes, the Intervention
Programme Start Date for North Lanarkshire was 1 October 2021 as this will keep all quarterly reports aligned with
normal Service planning and reporting. It is anticipated that the total resource required from the Intervention
Programme Start Date of 1 October 2021 is as follows, as detailed in Appendix 4 Table 4: 
Activity/ statutory Duty Required FTE resource
calculated-annual
Required FTE resource
calculated - over 5 years
Food Law Recovery process visits  16.66
Food Interventions – first recurring programmed
intervention only 
13.16
FL intervention revisits  2.84
FL Interventions re Poor Compliance and New
Businesses Year 1 Only 
4.71
New Business Interventions Years 2 to 5 2.22 8.89
Service Requests 3.89 19.45
formal food enforcement notices  0.35
Health & Safety Enforcement 3 15
OCV/Primary Producers 0.92 4.6 
Subtotal – 5 year resource FTE 
85.66
(17.13 Average per
annum)   
Sickness/ Special Leave & Training 1.98 9.91
Miscellaneous Additional Demands on Service
Resource 
4.77
Total  100.34 FTE over 5 years  
20.07 FTE per annum
(average) 
A ‘standard day’ figure for the calculation of resources required to meet food law obligations has been considered
and determined that the figure of 7 hours is the most suitable. The OCV calculation has been calculated in
accordance with FFS/SFLEC OCV Guidance which does not include travelling time or time allocated to report writing
or enforcement activity. For the purposes of the OCV calculation, 1.0 officer-day equates to 5 FTE Hours.
Page 96 of 204

Page 97

food safety/occupational health & safety service plan 2024/2025 29 
The number of working days per officer per year, taking account of annual leave and public holidays is 218, however
other leave such as sickness absence, special leave and training still need to be factored in. This other leave has been
considered in the above table to determine resource needed. 
As an alternative to recruitment consideration will again be given to the use of agency staff for inspections, if
required, albeit any enforcement action will require to be handed back to NLC staff to implement. Costings of
agency inspections will need to be undertaken before a final decision is taken on this. 
A review of North Lanarkshire Council resource to meet its statutory obligations in terms of the Interventions Food
Law Code of Practice (Scotland) 2019 and Food Law Code of Practice (Scotland) 2019 has been undertaken as part of
the Food Law Code of Practice Deviation Recovery Plan. The estimated resource requirement shows a deficit in our
resource to meet statutory requirements. There is a national shortage of Environmental Health Officers which
impacts on the success of recruitment campaigns, particularly for temporary posts. The estimated resource
requirement is under ongoing review. At June 2024, we are still within Year 3 of the Intervention Programme Start
Date.
4.3 Staff Development Plan 
The Service is committed to ensuring that staff receive sufficient training in order to properly conduct their statutory
duties. The key aim of the performance review & development scheme (PRD) is to provide a means of identifying
training which meet their professional requirements and help reach the targets of the Operational and Service Plans
as well as the Single Outcome Agreement Framework. Limited management capacity within Business Regulation
coupled with preparations for EU exit dates set and resource demands from the pandemic meant the Business
Regulation Service was unable to deliver PRDs within 2019/2020 to 2023/2024. As yet there has not been the
resource to do so within 2024/2025. It is however ensured that all Business Regulation staff undergo a minimum of
10 hours of Continuous Professional Development (CPD) in food related matters, in line with requirements of the
Food Law Code of Practice (Scotland) 2019. This was achieved on an annual basis from 2019/2020 to 2023/2024. In
addition, all Environmental Health Officers within Business Regulation undergo a minimum of approximately 3 hours
of health and safety CPD annually. 
Adequate time needs to be set aside to allow officers to acquire knowledge and competency with new and amended
legislation and guidance e.g. that relating to improving allergen information for food sold prepacked for direct sale
introduced October 2021 (Natasha’s Law). In addition, there had been a need for officers to refamiliarize themselves
with other food guidance as a result of food interventions having been stood down. 
FSS rolled out Level 4 HACCP (Hazard Analysis and Critical Control Point) Courses and OCV courses and which were
successfully delivered online during the pandemic. The HACCP course lasted for 5 days with exams on the 6th day.
The revised HACCP run in 4th quarter of 2021/2022 and of 2022/2023 lasted for 4 days with exams on the 5th day. In
addition, 1 day study leave is given to each officer attending to prepare for exams, in accordance with the Council’s
Special Leave Policy. The OCV course also lasts for 4 days with exams on the 5th day. The revised OCV course during
2021/2022 ran for 3 days, with 14 hours pre-course reading. The time allocated to each course by the Council will
be 6 days for Level 4 HACCP and 5 days for OCV. During 2021/2022 we had 15 staff attend OCV training and none
attending Level 4 HACCP. During 2022/2023, 3 staff successfully completed Level 4 HACCP Training and
Qualification. OCV training courses were not available for these staff to attend in 2023/2024. It is hoped that places
will be available for an OCV course this year for these staff to attend to enable them to lead on OCV at Approved
Establishments. 
During 2022/2023, 21 Business Regulation staff underwent Food Competent Certifying Officer (FCCO) training and
successfully completed the examination. This is a requirement for BR Staff to act as FCCOs to provide and validate
export health certificates and attestations for the purpose of international food exports post EU exit.
Page 97 of 204

Page 98

food safety/occupational health & safety service plan 2024/2025 30 
During 2022/2023 and 2023/2024, the majority of Business Regulation staff attended a 2 day Enforcement Sanctions
training course through Food Standards Scotland. The purpose of these courses was to provide officers with the
scientific, legal, theoretical and practical knowledge, in order to competently serve a range of enforcement notices.
These courses included workshop participation alongside enforcement colleagues from other local authorities. 
E-learning courses from Food Standards Scotland were undertaken by most officers in 2023/2024. These included
three 7- hour courses on Ready to Eat Food, Game and Fish. This has been extended in 2024/2025 for remaining
officers who did not complete them last year due to competing demands. 
Resource required for training is included within Appendix 3 Table 12 - Summary Estimate of Resources Required to
Deliver Business Regulation Service Across the Food Law Recovery Period (Oct 2021-Sep 2026). 
SECTION 5: QUALITY ASSESSMENT 
5.1 Quality Assessment and Internal Monitoring
Key food law and occupational health & safety law policies and procedures are within scope of an ISO 45001: 2018
Occupational Health and Safety Management System and are periodically reviewed to reflect on-going legislative and
procedural changes. Reviews have recommenced following being stood down during the pandemic due to other
demands placed on the Service. 
In response to the 2018 Audit by FSS, we reviewed our internal monitoring, which had previously formed part of the
ISO System, and implemented an Internal Monitoring Policy and Procedure to ensure that the nature and quality of
food law interventions undertaken by officers are, so far as is reasonably practical, carried out to a uniform high
standard and that interpretation and action taken by officers is consistent. This Internal Monitoring Policy and
Procedure was stood down due to the pause in food law interventions and the additional pressures placed on the
Service in response to the pandemic. This Internal Monitoring Policy and Procedure was reviewed in 2023 and is
being implemented again during 2024/25. 
SECTION 6: REVIEW 
6.1 Review against the Operational Plan
The Service Plan will be reviewed quarterly by the Assistant Business Manager (Business Regulation) and details of
reviews will be documented in the minutes of the Protective Services Management Team and any decisions taken to
address deficiencies shall be recorded therein. Review and reporting delivery of the 2019/2020 Service Plan was not
concluded due to pressures placed upon the Service due to the pandemic. The intervention programme was not
concluded because inspections were stood down on 17 March 2020. Inspections missed because of that are
incorporated into the Food Recovery Plan contained within this Service Plan. Annual performance reports of Key
Performance Indicators shall be published on North Lanarkshire Council’s website at: www.northlanarkshire.gov.uk.
Review and reporting delivery of the 2021/2022 Service Plan was not concluded due to pressures placed upon the
Service due to the pandemic. Review against the Operation Plan was resumed during 2022/2023. 
6.2 Identification of any Variation from the Operational Plan 
Variances from the Operational Plan will be highlighted at the time of the review and any reasons for the variance
will be noted along with any corrective action, if appropriate.
6.3 Areas for Improvement
Page 98 of 204

Page 99

food safety/occupational health & safety service plan 2024/2025 31 
Any areas identified as requiring action will be detailed as part of the audit and review process. These will be
addressed by the Protective Services Manager and the Assistant Business Manager (Business Regulation) as part of
the review process and action taken shall range from immediate action to inclusion in the Operational Plan for future
years. Business Regulation participated in the NL Digital Sprint during 2021/22 for Licensing activities before the
main Service Sprint which is still to be completed. The resource capacity for this is included within Appendix 3 Table
11 - Miscellaneous Foreseeable Additional Demands on Service Resource. 
Review and upgrade of our MIS will also require a resource capacity which is difficult to determine, and which will
add to the demands placed on the Service. A new MIS solution has not yet been selected. 
In addition to the above there are Business Regulation Service Improvement Working Groups which are set up, as
required. The estimate of anticipated resource required is included within Appendix 3 Table 11 - Miscellaneous
Foreseeable Additional Demands on Service Resource. 
SECTION 7: PERFORMANCE PLANNING
7.1 Performance Plan
The Performance Plan for 2024/2025 details the targets which have been set for key areas of work. Monitoring against
these key areas will be undertaken on a quarterly basis as part of the review process and reasons will be recorded for
any non-conformance together with the appropriate corrective action. Inspections resumed on 1 September 2021
following the Desktop Transfer and revised Intervention Programme. However, for performance monitoring and
reporting purposes, the Intervention Programme Start Date for North Lanarkshire was 1 October 2021 (with the
agreement and approval of FSS) to keep all quarterly reports aligned with normal Service planning and reporting. At
1 April 2024, we were 6 months into Year 3 of a 5 Year Food Law Recovery Plan. 
The details are listed in the Appendix 1 Business Regulation Performance Plan below.
Page 99 of 204

Page 100

Appendix 1 - BUSINESS REGULATION PERFORMANCE PLAN 2024-2025
Note: The Intervention Programme Start Date for North Lanarkshire’s food law recovery was 1 October 2021 to keep all quarterly reports aligned with normal Service Planning and
Reporting. The food law recovery plan is programmed for a 5-year period from 1 October 2021. Note the Scottish Authority Food Enforcement Rebuild (SAFER) being led by Food Standards
Scotland could impact on the performance targets below. 
Core Activities Target Start
&
Stop Dates
Projected Achievements/
Outcomes
Lead
Team
Other
Teams
Monitoring Arrangements
BR1 Food Law Code of Practice Deviation
Recovery Plan
1 April 2024
to 31 March
2025
Continue the Food Law Code of Practice Deviation
Recovery Plan in accordance with FSS and Scottish
Food Enforcement Liaison Committee broad
principles
BR
Service
None Quarterly review
BR 2 Food Law Inspections of all risk rated
premises.
1 April 2024
to 31 March
2025
Undertake 80% of inspections within deadlines set
from FLCoP Deviation Recovery Plan.
BR
Service
None Monthly – Assistant BR
Manager / Quarterly review.
BR 3 Sampling in Food Premises. 1 April 2024
to 31 March
2025
Review sampling programme and take samples
within scope of sampling agreement with GSS &
FLCoP Deviation Recovery Plan. Priority given to
samples from Approved or manufacturing premises
located within North Lanarkshire.
BR
Service
None Sample numbers monitored by
PS Manager. Assistant BR
Manager to monitor follow-up
of reports of sample failures.
BR 4 National Food Sampling Programme. 1 April 2024
to 31 March
2025
Seek to conduct food sampling in partnership with
other agencies, in accordance with national
programmes & FLCoP Deviation Recovery Plan.
BR
Service
FSS,
WOSF
LG
Quarterly review of
programmes/ sample types by
Assistant BR Manager.
BR 5 Investigation of Food and Food
Premises Complaints.
1 April 2024
to 31 March
2025
Commence investigation of 90% of high risk food
and food premises complaints within 2 working days
of receipt.
BR
Service
None BR Managers monitor progress
of investigation.
BR 6 Investigation of Food and Food
Premises Complaints.
1 April 2024
to 31 March
2025
Commence investigation of 90% of low risk food
and food premises complaints within 5 working days
of receipt.
BR
Service
None BR Managers monitor progress
of investigation.
BR 7 Sampling from Public Water supply. 1 April 2024
to 31 March
2025
Limited to domestic complaint samples after referral
to SW has not resolved issue and sampling of
BR
Service
None Quarterly review by Assistant
BR Manager.
food safety/occupational health & safety service plan 2024/2025 32 Page 100 of 204

Page 101

33 food safety/occupational health & safety service plan 2024/2025 
commercial premises (manufacturers and approved
premises), as appropriate.   
BR 8 Investigation of Infectious Disease
Reports.
1 April 2024
to 31 March
2025
Respond to 94% of notifications in accordance with
the NHSL Epidemiological Investigation Protocol.
BR
Service
None Assistant BR Manager
BR 9 Requests for assistance and advice. 1 April 2024
to 31 March
2025
Respond to 93% of high risk requests for
assistance/advice within 2 working days of receipt.
BR
Service
None BR Managers to conduct
random checks.
BR 10 Requests for assistance and advice. 1 April 2024
to 31 March
2025
Respond to 93% of low risk requests for
assistance/advice within 5 working days of receipt.
BR
Service
None BR Managers to conduct
random checks.
BR 11 Ongoing review of food safety
policies and procedures in line with
Food Law Code of Practice
(Scotland).
1 April 2024
to 31 March
2025
Review policies and update where required. BR
Service
None Monitoring undertaken by
Assistant BR Manager.
BR 12 Professional Training. 1 April 2024
to 31 March
2025
Ensure all BR Officers meet professional
development targets including that required by the
Food Law Code of Practice (Scotland) and FCCO
training, as required by APHA.
BR
Service
Yes BR Managers ongoing review.
Monitoring for non BR Standby
Officers undertaken by
Protective Services Manager.
BR 13 Food Hygiene Information Scheme
(FHIS).
1 April 2024
to 31 March
2025
Maintain and supply data for FHIS BR
Service
None Assistant BR Manager
BR 14 Food Hygiene Information Scheme
(FHIS).
1 April 2024
to 31 March
2025
90% of food premises achieve the FHIS ‘Pass’ award.
It is anticipated there will be a greater number of
Improvement Required due to pause in programmed
interventions.
BR
Service
None Assistant BR Manager
Quarterly review.
BR 15 Food Premises Registration Form 1 April 2024
to 31 March
2025
Continue to develop online registration of food
establishments as Digital NL Sprint progresses
BR
Service  IT
Assistant BR Manager 
Page 101 of 204

Page 102

BR 16 Applications for approval under
Regulation EC No 853/2004
1 April 2024
to 31 March
2025
Ensure that all applications for approved premises
are processed within the legislative time frame
BR
Service
None Quarterly review by Assistant
BR Manager.
BR 17 Audit of Premises approved under
Regulation EC No 853/2004
1 April 2024
to 31 March
2025
Continue to progress implementation of the Official
Control Verification (OCV) audit process for
Approved Premises in line with FSS OCV
Implementation Guide.
BR
Service
None Quarterly review by Assistant
BR Manager.
BR 18 Private Water Supplies 1 April 2024
to 31 March
2025
Update and maintain register of Private Water
Supplies and investigate opportunity for online
publication. Continue to implement a monitoring
programme for each regulated supply and each
private water supply zone. For regulated supplies,
continue to undertake risk assessments, where
applicable, in relation to water introduced into, and
supplied through and from, each private water
supply system to premises in its area, to establish if
there is any risk that the water could pose a
potential danger to human health.
BR
Service
None Quarterly review by Assistant
BR Manager.
BR 19 Process all applications for Private
Water Supply Grant Assistance
1 April 2024
to 31 March
2025
Ensure that all applications for grant assistance are
processed within the legislative timescale.
BR
Service
None Quarterly review by Assistant
BR Manager.
BR 20 Attestation and Export Health
Certification Requirements and other
certification relating to exports.
1 April 2024
to 31 March
2025
Continue to provide Attestations, Export Health
Certificates, and other certification relating to
exports as required.
BR
Service  None
PS Manager/ Assistant BR
Manager.
BR 21 Health and Safety Enforcement. 1 April 2024
to 31 March
2025
Implement the provisions of the National Local
Authority Enforcement Code. Priority with regard to
implementation will be dependent on resources and
will focus on those provisions which are particularly
relevant to North Lanarkshire Council.
BR
Service
HSE Assistant BR Manager/
Quarterly Review.
BR 22 Gas Safety and electrical safety in
catering establishments.
1 April 2024
to 31 March
2025
Undertake surveillance in catering premises visited
during food inspections for matters of evident
concern relating to gas safety and electrical safety.
BR
Service
None Assistant BR Manager/
Quarterly Review.
food safety/occupational health & safety service plan 2024/2025 34 Page 102 of 204

Page 103

food safety/occupational health & safety service plan 2024/2025 35 
A recent trend being reported is catering premises
switching from mains gas to LPG. As well as the
requirements for proper installation, maintenance
and inspection by a competent Gas Safe registered
engineer, visits should also check the nature of any
fuel supplies to gas fired appliances. Where LPG is
used as a fuel supply, checks should include its safe
use and storage.
Useful resources: Catering Information Sheet
(CAIS23) - Gas safety in catering and hospitality
Catering Information Sheet Catering Information
Sheet (CAIS10) – Ventilation in catering kitchens
http://www.hse.gov.uk/toolbox/gas.htm Safe use of
propane and butane cylinder and cartridges.   
BR 23 Hospitality Establishments-electrical
safety
1 April 2024
to 31 March
2025
To improve standards of compliance, increase
awareness of legislative requirements to ensure
electrical equipment with potential to cause injury is
maintained in a safe condition. Remind duty holders
to ensure both the fixed installation and electrical
appliances are inspected by competent persons at
appropriate intervals. Pubs, restaurants and cafés
are urged to ensure outdoor electrical equipment
such as lights and heaters are specifically designed
for outdoor use, installed by a competent person
and checked regularly for damage or water ingress.
Useful guidance Electrical safety at work  
Assistant BR Manager/
Quarterly Review.
BR 24 Health & Safety projects (subject to
adequate resources and which will
be dependent on FLCoP Deviation
Recovery Plan).
1 April 2024
to 31 March
2025
(i) ( Proactive inspection of High Volume
Warehousing/Distribution in respect of poorly
managed workplace transport.
(ii) Proactive inspection of industrial retail/wholesale
premises in respect of poorly managed workplace
BR
Service
HSE/
WSH&
SLG
Assistant BR Manager/
Quarterly Review.
Page 103 of 204

Page 104

food safety/occupational health & safety service plan 2024/2025 36 
transport/work at height/cutting machinery/lifting
equipment.
(iii) Raise awareness with relevant premises (e.g.,
restaurants, takeaways, warehouses that receive
regular deliveries) the national priority in relation to
welfare provision for delivery drivers that HSE
guidance states that where it is practicable and
appropriate, any onsite toilet and rest facilities
should be made available to visiting workers if
requested.
(iv) incorporate into interventions of commercial
catering premises using solid fuel cooking
equipment, that appropriate measures are taken to
prevent carbon monoxide poisoning from lack of
suitable ventilation and/or unsafe appliances.
(v) Visitor attractions to prevent or control ill health
arising from animal contact-awareness raising,
education or proactive intervention.
(vi) Inflatable Amusement Devices-awareness raising
of safety measures;
(vii) Trampoline Parks/Inflatable Jump Parks-
highlight with local duty holders improved
information provision and supervision of users; 
(viii) Investigation of any patterns of accidents. 
(ix) Work Related Road Safety-awareness raising in
LA enforced premises e.g., warehouses, restaurants,
takeaways and other retail premises where workers
make deliveries that law requires business to
manage work related road risk in accordance with
recently reviewed joint HSE/DfT guidance Driving
and Riding Safely for Work   
Page 104 of 204

Page 105

food safety/occupational health & safety service plan 2024/2025 37 
(x) Falls from height-work on/adjacent to fragile
roofs/materials- where identified during visits
discuss associated risks, to ensure prospective
clients for repair and maintenance work (owner or
building user) are aware of their duties under CDM
2015 and the precautions needed, referring them to
the appropriate guidance Fragile roofs: Safe working
practices (hse.gov.uk). 
(xi) Raising awareness of the work related stress and
mental health campaign ‘Working Minds’ with
businesses. 
(xii) Legionella-Raise awareness of the risk of spa
pools and hot tubs in the holiday sector.
(xiii) project that Legionella risks from cooling towers
in built up areas are being appropriately managed. 
(xiii) Continue local project regarding compliance
within tanning salon sector 
(ix) Nailbar project in conjunction with other LA
within WSHSLG 
Officers to continue to deal with any MEC arising
whilst carrying out other interventions, including e.g.
• ‘Slips, Trips & Falls’
• handling hot liquids in catering premises
• safety of solid fuel ovens in catering
premises, and
• work at height and fragile roofs. 
Additional projects will be added to those detailed
above if they become relevant having been   
Page 105 of 204

Page 106

food safety/occupational health & safety service plan 2024/2025 38 
highlighted nationally by the HSE, regionally by the
WSHSLG or by local intelligence.   
BR 25 Licensing Applications 1 April 2024
to 31 March
2025
Ensure licensing responses to consultation are made
within 10 working days.
BR
Service
Licensi
ng
Assistant BR Manager
BR 26 Skin Piercing & Tattooing Licensing
Applications
1 April 2024
to 31 March
2025
Review licence conditions associated with Skin
Piercing & Tattooing Licensing Applications
BR
Service
None Assistant BR Manager
BR 27 Process all applications for skin
piercing and tattooing licences.
1 April 2024
to 31 March
2025
Ensure that all applications are processed within the
legislative timescale.
BR
Service
None Assistant BR Manager/
Quarterly Review
BR 28 Skin Piercing & Tattooing Licenses 1 April 2024
to 31 March
2025
Develop Licences incorporating photograph of
licence holder for Skin Piercers and Tattooists
BR
Service
None Assistant BR Manager/
Quarterly Review
BR 29 Investigation of reported accidents 1 April 2024
to 31 March
2025
Commence 88% of investigations required by HSE
incident selection criteria within 3 working days.
BR
Service
None Assistant BR Manager/
Quarterly Review
BR 30 Maintain ISO 45001 : 2018 Standard
Accreditation.
1 April 2024
to 31 March
2025
Implement any action plan provisions following an
internal and/or external audit.
BR
Service
EH &
BI
PS Manager/Assistant BR
Manager.
BR 31 Review Business Regulation
Procedures and Work Instructions
relevant to internally audited ISO
45001 standards.
1 April 2024
to 31 March
2025
Where resources allow, review BR Procedure and
Work Instructions relevant to ISO 45001 standards.
BR
Service
EH &
BI
Assistant BR Manager/
Quarterly Review.
BR 32 Joint Public Health Protection Plan. 1 April 2024
to 31 March
2025
Participate in training events and work in
partnership with NHS Lanarkshire Health Board and
South Lanarkshire Council, as appropriate.
BR
Service
NHS
LHB
PS Manager/ Assistant BR
Manager.
BR 33 Review of Fees & Charges 1 April 2024
to 31 March
2025
Review Business Regulation Fees and Charges BR
Service
None PS Manager/ Assistant BR
Manager.
BR 34 Planning and building control
consultations
1 April 2024
to 31 March
2025
Ensure planning and building control Service
Requests are actioned as appropriate within the 21-
day consultation period.
BR
Service
Built
Env
PS Manager/ Assistant BR
Manager.
Page 106 of 204

Page 107

food safety/occupational health & safety service plan 2024/2025 39 
BR 35 Management Information Systems 1 April 2024
to 31 March
2025
Data management in line with Retention Schedule BR
Service
None PS Manager/ Assistant BR
Manager.
BR 36 Extant Notices 1 April 2024
to 31 March
2025
Review of Extant Notices BR
Service
None Assistant BR Manager.
BR 37 Template Notices 1 April 2023
to 31 March
2024
Review of Template Notices used by Business
Regulation
BR
Service
None Assistant BR Manager.
BR 38 Digital NL 1 April 2024
to 31 March
2025
Participate with Digital NL Sprint for Protective
Services as required
BR
Service
CE
Dept
PS Manager/Assistant BR
Manager.
BR 39 Scottish Authority Food Enforcement
Rebuild (SAFER)
1 April 2024
to 31 March
2025
Participate in FSS SAFER and other working groups as
appropriate
BR
Service
None Assistant BR Manager
BR 40 Internal Monitoring 1 April 2024
to 31 March
2025
Undertake Internal Monitoring in line with Internal
Monitoring Policy & Procedure
BR
Service
None Assistant BR Manager
BR 41 Public Entertainment Licence Events 1 April 2024
to 31 March
2025
Monitor PEL events and undertake site visits as
appropriate subject to adequate resources and in
response to concerns
BR
Service
None Assistant BR Manager
Page 107 of 204

Page 108

food safety/occupational health & safety service plan 2024/2025 40 
APPENDIX 2- STATEMENT OF COMMITMENT BETWEEN LOCAL AUTHORITY AND HSE REGULATORY SERVICES 
Appendix 2 -
Statement of commitm       
APPENDIX 3- TABLES OF CALCULATIONS AND INFORMATION RELATING TO STAFF RESOURCES (Revised)
Contents
• Table 1 - Annual Breakdown of Food Law Recovery Plan Interventions Required to Be Carried Out
• Table 2 - Food Law Interventions Recovery- Officer FTE Resource Calculation Per Intervention Category (Recovery Visits Only)
• Table 3 - Estimate of Timescales and Numbers for First Next Programmed Intervention After Food Law Recovery Intervention
• Table 4 - Calculation of Resources Required for First Next Programmed Intervention After Food Law Recovery Intervention
• Table 5 - Combined Estimate FTE Resource Calculation Per Annum for Food Law Recovery and Pi Interventions
• Table 6 - Summary of FTE Base Resource Needed to Meet FLRP+ First Recurring Pi Thereafter
• Table 7 - Estimate of Minimum FTE Resource Requirement for Revisit Interventions
• Table 8 - Additional Food Law Interventions Arising from Poor Compliance and From New Businesses
• Table 9 - Estimated Resource Required for Formal Food Enforcement Notices
• Table 10 - Service Requests Resource Summary-Based on A Typical Year Pre-Covid (2018-19)
• Table 11 - Miscellaneous Foreseeable Additional Demands on Service Resource
• Table 12 - Summary Estimate of Resources Required to Deliver Business Regulation Service Across the Food Law Recovery Period (Oct 2021-Sep 2026) 
APPENDIX 3 Revision
2024-2025.pdf
Page 108 of 204

Page 109

food safety/occupational health & safety service plan 2024/2025 41 
APPENDIX 4- UPDATED TABLES OF CALCULATIONS AND INFORMATION RELATING TO STAFF RESOURCES (2023/2024)
Contents
• Table 1 - Annual Breakdown of Food Law Recovery Plan Interventions Required to Be Carried Out
• Table 2 - Food Law Interventions Recovery- Officer FTE Resource Calculation Per Intervention Category (Recovery Visits and New Premises Visits Only)
• Table 3 - Estimate of Minimum FTE Resource Requirement for Revisit Interventions
• Table 4 - Estimate of Resources Required to Deliver Business Regulation Service Across the Food Law Recovery Period (Oct 2021-Sep 2026) 
APPENDIX 4 Revision
2024-2025.pdf
APPENDIX 5 – PREMISES OUTWITH FOOD LAW RATING - CALCULATION OF REQUIRED ANNUAL RESOURCE (JUNE 2024) - APPROVED PREMISES, HIGH-RISK GROUP 1 MANUFACTURERS
AND PRIMARY PRODUCERS
Appendix 5 Revision
2024-2025.pdf
Page 109 of 204

Page 110

Page 110 of 204

Page 111

North Lanarkshire Council
Report
Environment & Climate Change Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    MF/PB Date 21/08/24 
Fly-tipping – steps taken to counter the increase in criminal
activity 
From  Lyall Rennie, Chief Officer (Community Operations)  
E-mail RennieLy@northlan.gov.uk  Telephone 07855 193500 
1. Background 
1.1 Fly-tipping is the illegal disposal of household, industrial, commercial, and other
‘controlled’ waste.  It results in environmental blight, damage to land and water courses,
and can harm both farmed and wild animals. The motivations for fly-tipping vary and
include a basic lack of awareness, laziness, and financial gain. 
1.2 The cost of dealing with fly-tipping and litter is estimated to be in the region of £281
million per year. Litter and flytipping: scale and cost - gov.scot (www.gov.scot) 
This figure does not include the cost to private landowners in removing illegal waste
deposits from their land. There are more than 60,000 incidents of fly-tipping reported in
Executive Summary
Fly-tipping is a growing concern for communities across the length and breadth of Scotland.
A number of local authority services, other public sector partners and private landowners
face significant financial and resource burdens associated with clean ups, enforcement,
and prevention initiatives. 
This report provides a summary of recent steps taken by Protective Services’ Pollution
Control & Public Health team to counter the increase in criminal activity. 
Recommendations
It is recommended that the Environment and Climate Change Committee: 
(1)   Note the actions which are being taken by appropriate Council officers, in conjunction  
with external partners, to utilise all available resources to counter and deliver effective  
punitive sanction against the criminal acts of fly-tipping. 
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (17) Ensure we keep our environment clean, safe, and attractive
Programme of Work One Service
Item 8
Page 111 of 204

Page 112

Scotland each year. The 2014 National Litter Strategy captured direct local authority
costs for the removal of fly-tipped materials, and when these figures are increased to
account for inflation and population growth, they currently stand at approximately £13
million. 
1.3 In North Lanarkshire, over the last 5 financial years 2019-2020 to 2023-2024, the costs
incurred by the Council for the clearance and disposal of fly-tipping from council land,
adopted roads etc. amounted to £2.1668 million. That financial burden relates to the
uplift and disposal of 19,449 tonnes of fly-tipped materials and does not include costs
for removal of hazardous waste such as asbestos and tyres.  This data also does not
include the costs incurred by private landowners in respect of clearing and disposing
of illegal dumping on their land. 
1.4 In June 2023, the Scottish Government published the new National Litter and Fly-
Tipping Strategy with an associated 2023-2024 Action Plan
https://www.gov.scot/publications/national-litter-flytipping-strategy/documents/. 
Actions which have already been delivered include: 
• Raising the value of the Fixed Penalty Notice which can be issued for the crime of
fly-tipping from £200 to £500 (changed in December 2023); and
• Simplify existing fly-tipping reporting channels by the closure of the Dumb Dumpers
website (closed in March 2023 https://www.sepa.org.uk/media/594698/dumb-
dumpers-closure-faqs.pdf). 
1.5 North Lanarkshire Council provides 6 household waste and recycling centres which 
are open every day of the year excepting Christmas Day and New Year’s Day. 
Additionally, the Council subsidises a bulk uplift service for residents to dispose of 
waste items that fall outwith the normal domestic waste stream e.g. white goods.   
2. Report 
2.1 Every local authority in Scotland faces significant issues with the problems associated
with fly-tipping. Instances of fly-tipping can be broadly categorised into 3 types: 
• Small scale, domestic dumping;
• Small and medium sized business (SME) dumping; and
• Large scale industrial dumping by serious organised crime groups (SOCGs). 
2.2 The motivations for fly-tipping include a basic lack of awareness, laziness, and the
desire to make financial gain. We would contend that it would be reasonable to assume
that everyone who engages in regular fly-tipping understands that what they are doing
is wrong, that it is illegal and that they are committing crimes which cost the public
purse, have a financial impact upon private landowners and negatively impact the
environment. 
2.3 Over recent years, the Council has seen a rise in the costs we have incurred for the
clean-up and disposal of illegally fly-tipped materials.  As an example, during Easter
weekend 2021 the trailers shown in Appendix 1 were dumped, full of waste materials,
in Netherton Industrial Estate.  They were not roadworthy and could not be attached to
a tractor unit and driven away; the Council required to engage a contractor to dismantle
them at the location, after they had been emptied.  The trailers contained a total of 77.4
tonnes of household and builders’ waste.  The cost to the Council for removing these
trailers and the waste within them was £17,377.  No CCTV coverage of the trailers
Page 112 of 204

Page 113

being moved along the local road network was obtained and no individual was identified
as being responsible. 
2.4 In order to improve the Council’s evidence capture, to enable action to be taken against
any and all identified perpetrators of fly-tipping, we agreed to fund a proposal to buy
and site remotely deployable CCTV that was capable of operating without connection
to a mains power source and which could be installed in rural and urban locations
known to be hotspots of fly-tipping activity.  Within the staff of Protective Services, we
understand that criminals involved in regular fly-tipping will not cease until those
responsible are caught and punished.  We have now deployed 40 remote CCTV
cameras over a number of hotspot locations associated with extensive fly-tipping
problems. 
2.5 The remotely deployable CCTV cameras are able to be quickly installed and removed,
providing us with excellent mobile capabilities.  They are fitted with motion sensors, can
operate using solar power, and are connected via a link to the Council’s 24/7 staffed
CCTV hub.  When fly-tipping activities cease at a location under evidence capture, they
can be easily moved to the next priority site identified.   
2.6 The remote CCTV cameras have been sited at locations identified by: 
• Analysing the reports of fly-tipping received by the Council;
• Utilising intelligence gathered by our Environmental Protection Officers, who
investigate fly-tipping offences for loads that fall to our jurisdiction i.e. up to the
equivalent of a skip load; and
• Listening to and acting upon feedback from communities and businesses in respect
of where regular fly-tipping is occurring. 
Our EPOs patrol these identified locations in conjunction with our use of the Council’s 
CCTV network and the recently deployed remote CCTV equipment to ensure that 
fresh instances of fly-tipping are captured and dealt with appropriately.  In most 
instances where evidence is uncovered to identify the perpetrator, this results in the 
issue of a Fixed Penalty Notice (FPN).  
2.7 The remote CCTV camera deployment has resulted in an increase in the number of
FPNs issued by the Council’s Environmental Protection Officers and the capture of high
quality evidence of the commission of offences.  The officers are authorised in terms of
the Environmental Protection Act 1990 to issue £500 FPNs in instances where the
necessary level of evidence has been secured.  The below table shows the increase in
FPNs issued over the last 4 financial years, and it is worthy of note that several other
Scottish local authorities have visited us to examine our fly-tipping work, to understand
how we are obtaining good evidence capture and interventions, as our peers consider
that we are illustrating a best practice approach in this area. 
Financial Year Fly-Tipping FPNs Issued
2020-21  39
2021-22  32
2022-23  57
2023-24  109 
Page 113 of 204

Page 114

2.8 Established in 1996, the Scottish Environment Protection Agency (SEPA) is the
principal regulator for the prevention of waste crime in Scotland.  Our CCTV evidence
capture of serious fly-tipping incidents is being passed on via sanitised intelligence logs
to SEPA for appropriate enforcement considerations.  Intelligence is also being shared
with Police Scotland where we have reasonable cause to suspect that instances of fly-
tipping are being committed by serious organised crime groups. 
2.9 We are now attending regular meetings at a local level with officers from adjoining
council areas, Police, SEPA and other partners to ensure that local intelligence is
disseminated, and the jurisdictional boundaries of local authority areas are not
preventing the co-ordinated investigation of serious offences.  An example of this is the
Lanarkshire Partnership Against Rural Crime (LPARC).  Police Scotland led meetings
take place on a quarterly basis with attending partners including representatives of the
Forestry Commission and the National Farmers Union (Scotland).  A local fly-tipping
forum meets every 6 weeks between Police Scotland, SEPA, and North and South
Lanarkshire Councils where more detailed intelligence on fly-tipping and waste crime
is discussed.  These meetings are crucial to developing local partnership interventions
to tackle fly-tipping crimes, led by SEPA and supported by Police and local authority
officers. 
2.10 Since the deployment of our remote CCTV equipment, we have had 3 criminal cases
called in court: 
• In May 2023, Miroslaw Bortkiewicz was fined £750 and ordered to pay a £300
compensation order for a fly-tipping offence committed in October 2021 
https://news.sky.com/story/fly-tipper-ordered-to-pay-up-after-dumping-waste-in-
motherwell-12872769;
• An individual received a £100 Fiscal fine for a fly-tipping offence captured at
Windyedge Road, Cleland in July 2023, and was ordered to pay the Council £700
in costs for the uplift and disposal of the waste;
• A case called in May this year for a fly-tipping offence captured in Forgewood,
Motherwell, however proceeding s have now been abandoned by the Crown as the
individual responsible has left the country and is not expected to return. 
2.11 There are further ongoing criminal cases in respect of fly-tipping crimes which have
been reported to Crown, and these include evidence capture in Bargeddie, Carnbroe,
Newhouse Industrial Estate, Motherwell and Braidhurst Industrial Estate, Motherwell. 
2.12  With the current backlogs and resulting delays being faced by the criminal courts
process, there can be significant delays between the reporting of fly-tipping cases and
matters being brought to a successful conclusion.  Consequently, officers from
Environmental Health are liaising with colleagues from SEPA on a fast-track procedure
to process cases with strong evidence capture.  SEPA officers are empowered to issue
fixed monetary penalties of £1,000.  SEPA’s Board can approve variable monetary
penalties of up to £40,000 and can invoke both civil and criminal asset recoveries in
respect of proceeds of crime legislation.  We have agreed a protocol that, where we
are able to provide the requisite level of offences within our jurisdictional area, SEPA
will issue variable monetary penalties to the identified individuals responsible for these
waste crimes.  This new collaborative approach should provide a more timely and
effective mechanism to punish the perpetrators of waste crime.   
3. Measures of success 
Page 114 of 204

Page 115

3.1 A reduction in the levels of environmental blight suffered across the Council area as a
consequence of fly-tipping offences. 
3.2 A reduction in the costs borne by both the Council and private land owners for the uplift
and proper disposal of illegally dumped waste. 
4. Supporting documentation 
Appendix 1 Photograph of trailers dumped in Netherton Industrial Estate during
Easter weekend 2021.
Appendix 2 Photograph of abandoned waste laden trailer on the A80 at
Moodiesburn. 
Appendix 3 Photograph of used tyres illegally dumped at an abandoned site in
Newhouse Industrial Estate.
Appendix 4 Photograph of illegally dumped waste in a lay-by, Aitkenhead Road,   
Bargeddie.
Appendix 5 Photograph of illegally dumped waste on the Glasgow / Edinburgh Road
at Newhouse.
Appendix 6 Photograph of illegally dumped asbestos in Shotts. 
Lyall Rennie
Chief Officer (Community Operations) 
Page 115 of 204

Page 116

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Page 116 of 204

Page 117

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Improved evidence capture and enforcement action against the perpetrators of fly-
tipping will reduce the environmental blight suffered within our jurisdictional area
and our actions will continue to have a positive environmental impact.
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 117 of 204

Page 118

Appendix 1 trailers dumped in Netherton Industrial Estate during Easter weekend 2021. 
Cost of removal £17, 377. 
Page 118 of 204

Page 119

Appendix 2 abandoned waste laden trailer on the A80 at Moodiesburn.    
Cost of removal £8,813. 
Page 119 of 204

Page 120

Appendix 3 Used tyres illegally dumped at an abandoned site in Newhouse Industrial 
Estate. 
Page 120 of 204

Page 121

Appendix 4 illegally dumped waste in a lay-by, Aitkenhead Road, Bargeddie. 
Page 121 of 204

Page 122

Appendix 5 illegally dumped waste on the Glasgow / Edinburgh Road at Newhouse. 
Page 122 of 204

Page 123

Appendix 6 illegally dumped asbestos in Shotts. 
Page 123 of 204

Page 124

Page 124 of 204

Page 125

North Lanarkshire Council
Report
Environment and Climate Change Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    LR/PB/MM Date 21/08/24 
Trading Standards – Underage Sales, Illicit Tobacco and Vaping
Products 
From  Lyall Rennie, Chief Officer (Community Operations)  
E-mail RennieLy@northlan.gov.uk  Telephone 07855 193500 
Executive Summary
North Lanarkshire Council has a duty under Section 26 of the Tobacco and Primary Medical
Services (Scotland) Act 2010 to carry out an appropriate enforcement programme to
investigate complaints of the offence of selling tobacco or Nicotine Vapour Products (NVPs)
to persons under the age of 18 and to take measures to reduce the incidence of such
offences.  
This report provides information on the level of enforcement activity and complaints relating
to the Act.  The report also advises of the service interventions to combat illicit tobacco and
illicit NVPs, including the partnership work which we undertake with HM Revenue and
Customs (HMRC). The Trading Standards service also has legal duties to undertake
enforcement functions under Section 93 of the Trade Marks Act 1994 and various consumer
product safety legislation. 
Recommendations
Is it recommended that the Environment and Climate Change Committee: 
(1) Endorses the enforcement strategy relevant to tobacco and NVP products; and 
(2) Recognises the enforcement action undertaken during 2023/24.  
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition Statement
(9) Invest in early interventions, positive transitions, and
preventative approaches to improve outcomes for children and
young people
Programme of Work All Programmes of Work
Item 9
Page 125 of 204

Page 126

1. Background 
1.1 Trading Standards has a duty to enforce legislation relating to several age-restricted
products. These include the supply of tobacco, nicotine vapour products (NVPs),
fireworks, spray paints, computer games, solvents and butane gas. 
1.2 Smoking remains the greatest threat to public health in Scotland and Trading Standards
continues to play a vital role in the Scottish Government’s Tobacco Control Strategy. 
Specific Scottish Government funding has been allocated to the local authority in order
for Trading Standards to enforce all of the legislative requirements for both tobacco and
NVPs. This is incorporated into the Scottish local authority Enhanced Tobacco Sales
Enforcement Protocol (ETSEP). 
1.3 The Scottish Government also requires all local authority Trading Standards Services 
to: 
• Provide education and advice visits to 20% of the registered tobacco product and
NVP retailers annually, and;
• Conduct underage sales test purchase exercises to 10% of the registered tobacco
product and NVP retailers annually, in line with the government’s health agenda and
the protection of young people. 
1.4 The 2017-2021 Scottish Health Survey identified that the highest prevalence of
smoking in Scotland was in North Lanarkshire (21%). Smoking is the leading cause of
preventable deaths with around a quarter of all deaths in Scotland associated with
tobacco use. The Scottish Government tobacco strategy aims for Scotland to have a
smoking rate of 5% or lower and to create a tobacco-free generation by 2034. 
1.5 The Chartered Trading Standards Institute https://www.tradingstandards.uk/
acknowledges that whilst vaping poses far less risk than smoking tobacco (which
remains the single biggest cause of preventable illness and death in the UK) and vapes
can be an effective means of helping smokers to quit, there is a need for better
regulation to ensure that vapes do not get into the hands of children and create nicotine
dependence in a new generation.  Public Health expert advice remains that smokers
should switch to vaping products to help them quit smoking, but non-smokers should
not take up vaping.  Vaping products contain significantly less harmful chemicals than
cigarettes but are not without some risks of their own. 
1.6 The current regime of unrestricted displays and flavours has led to bright, colourful and
attractive displays of products which are clearly aimed at the youth market and
advertised as a lifestyle product rather than a smoking cessation aid. Couple this with
the explosion onto the market of single use vapes which are cheap and easy to use,
which undermines vapes as a valuable tool in smoking cessation.  Vapes should not in
our view be marketed as a lifestyle product, attracting a whole new generation of young
people who have never smoked, and like tobacco, it is unlawful to supply them to
persons below the age of 18 years. These products, whilst safer than traditional tobacco
products, are not without risk; they can lead to nicotine dependence, and their long-
term effects are as yet unknown.   
1.7 The Scottish Government has already published proposals to ban the sale and supply
of single-use vapes in Scotland using existing environmental powers. If agreed by the
Scottish Parliament, this would come into effect on 1 April 2025.   
1.8 The UK has developed one of the highest tobacco tax regimes in the world, to deter
people from smoking. These high duty rates, make tobacco less affordable and have
helped reduce smoking prevalence. Illicit tobacco, however, undermines these efforts.
Page 126 of 204

Page 127

The trade in illegal tobacco creates a cheap source for tobacco for the public including
children and young people, who might otherwise be deterred by cost. 
2. Report 
2.1 For the financial year 2024-2025, the following targets have been set by the Scottish
Government for tobacco and NVP retailers: 
• Visit a minimum of 82 tobacco retailers to provide relevant legislative business
education and advice (20% of the 406 registered tobacco retailers in North
Lanarkshire);
• Conduct covert test purchase visits at a minimum of 41 tobacco retailers (10%
of the 406 registered tobacco retailers in North Lanarkshire);
• Visit a minimum of 65 NVP retailers to provide relevant legislative business
education and advice (20% of the 322 registered NVP retailers in North
Lanarkshire); and
• Conduct covert test purchase visits at a minimum of 33 NVP retailers (10% of
the 322 registered NVP retailers in North Lanarkshire). 
These targets aim to enhance compliance and ensure responsible practices within the
retail sector. 
2.2 The Council's enforcement strategy towards tobacco and NVPs includes: 
2.2.1 Guidance to Retailers: 
Retailers receive guidance visits on tobacco products and NVPs, emphasising
legal requirements to prevent underage sales and the Council’s commitment to
enforcement. 
2.2.2 Investigating Complaints: 
Complaints related to sales to individuals under 18 years of age will be
thoroughly investigated. 
2.2.3 Fixed Penalty Notices (FPNs):
FPNs will be issued for breaches of legislation, with non-payment reported to
the Procurator Fiscal. 
2.2.4 Banning Orders: 
Businesses violating tobacco or NVP laws three times within a rolling 2-year
period may face banning orders.
Trading Standards operations tackle underage sales and illegal tobacco trade
| North Lanarkshire Council 
2.2.5 Enforcement Programme: 
Covert test purchase exercises involving underage volunteers will be
undertaken, aligning with the Scottish Government’s tobacco and vaping
framework. 
https://www.gov.scot/publications/tobacco-vaping-framework-roadmap-
2034/pages/5/ 
Page 127 of 204

Page 128

Enforcement Activity Report (2023-2024) 
2.3 During the financial year 2023-2024 a similar enforcement strategy was implemented,
focusing on tobacco and NVP retailers. The following statistics and actions were
recorded: 
2.3.1 Tobacco Retailers:
• Total education & guidance visits to retail outlets: 193
• Complaints received: 2
• Reports to Procurator Fiscal: 1
• Banning orders: Nil
• Test purchase exercises:
 Attempts made: 57
 Sales: 10
 Fixed Penalty Notices (FPNs) issued: 19
• 17 x £200 FPNs issued for first sale
• 2 x £400 FPNs issued for second sale within a 24-month period (all FPNs
are discounted by £50 if paid within 14 days)
 Test purchase failure rate: 17.54% 
2.3.2 NVP Retailers:
• Total education visits to retail outlets: 218
• Complaints received: 77
• Reports to Procurator Fiscal: Nil
• Banning orders granted: 1 
Council supports disposable vape ban | North Lanarkshire Council
• Test purchase exercises:
 Attempts made: 69
 Sales: 14
 FPNs issued: 25
• 18 x £200 FPNs issued for first sale
• 5 x £400 FPN issued for second sale within a 24-month period
• 2 x £600 FPN issued for third sale within a 24-month period (all FPNs are
discounted by £50 if paid within 14 days)
 Test purchase failure rate: 20.28% 
2.4 Enforcement activity to provide advice to business and carry out a programme of test
purchase activity was significantly impacted by the covid pandemic. During the two
years immediately following the outbreak, Trading Standards had a key role in
enforcing and advising on the legislative restrictions on business which had to be
prioritised. 
2.5 The impact of the lack of our visibility within retail premises was significant, with a sharp
rise in complaints and test purchase failure rates for both tobacco and NVPs. There is
no doubt this has been exacerbated by the explosion in popularity and accessibility of
single use vapes. 
2.6 During 2023-2024, the service experienced a significant increase in complaints related
to the sale of age-restricted products. Specifically, 77 complaints alleged the sale of
NVPs to individuals under the age of 18. This contrasts significantly with the 8 NVP
related complaints received during the 3-year period from 2019-2020 to 2022-2023. In
response, the service focused education and advice visits to retail premises selling
NVPs, exceeding the Scottish Government target to visit 58 premises by visiting 218
NVP retailers.
Page 128 of 204

Page 129

2.7 The majority of the 44 FPNs issued in 2023-2024 were for first sales.  A FPN for a first
sale is £200 (discounted by £50 to £150 if paid within 14 days).  2 retailers sold tobacco
products and 5 retailers sold NVPs on a 2nd occasion, resulting in a £400 FPN
(discounted to £350 for payment within 14 days).  1 business and their employee sold
an NVP to an underage volunteer on a 3rd occasion, resulting in a £600 FPN for both
the employee and business entity.   
2.8 The Motherwell retailer who sold NVPs to underage children on 3 occasions between
May 2022 and September 2023 was issued with a banning order. The business and its
employees were banned from carrying on a tobacco or NVP business for 2 years (the
maximum period available) from 16 January 2024.  The business was also ordered to
pay the Council £315 in costs.  The ban and costs were in addition to the FPNs issued
and paid by the business, totalling over £1,000. 
2.9 At the time of compiling this report, an application is being processed for a banning
order against a premise that sold NVPs to persons under the legal age on 3 occasions
between October 2023 and May 2024.  The business, subject to 16 incidents of
complaints and intelligence, has been issued with and paid 3 FPNs totalling £1,050. 
Illicit goods 
2.10  Illicit tobacco products are sold at less than half the price of legal products, around £6
for a packet of cigarettes or £8 for a 50g pouch of hand rolling tobacco, making them
more affordable and appealing. 
2.11 Illicit NVPs feature tanks with capacities exceeding the 2ml legal limit. The vape tank is
the part of the product which holds the liquid to be vaped and contains a heat coil which
vaporizes the liquid for subsequent inhalation. 
Operation CeCe 
2.12  Operation CeCe is a joint initiative between Trading Standards services across the UK
and HMRC. The partnership’s goal is to reduce the availability of illicit tobacco and
disrupt criminal activity related to tobacco distribution.  Operations include intelligence
gathering from a number of sources, and subsequent seizure operations, often using a
specially trained sniffer dog to detect illicit tobacco which can be hidden behind walls
or radiators, hidden within toilets or mixed within legitimate stock. Retailers often
attempt to evade detection, for example by spraying tobacco with vinegar or using
spices to put the dog off the scent. 
New Sanctions 
2.13 As of July 2023, new powers have come into force, allowing penalties of up to £10,000
for businesses and individuals caught selling illicit tobacco products. Trading Standards
can refer cases to HMRC for further investigation.  HMRC administers the penalties to
ensure appropriate sanctions are applied for and enforced. These measures strengthen
the response against retail level supply of illicit tobacco and act as a deterrent for illegal
sales. 
2.14 Enforcement Activity (since June 2023) 
2.14.1 Seizures:
• Illicit cigarettes: 98,680 sticks
• Hand rolling tobacco (HRT): 13 kg
Page 129 of 204

Page 130

• Illicit NVPs: 2,772 illicit NVPs
• Seizures from 9 premises 
2.14.2 Undertakings:
• The controlling minds of 2 businesses have formally agreed to refrain from
supplying illicit tobacco in the future. 
2.14.3 Reports to the Procurator Fiscal:
• 3 criminal case reports have been submitted to the Procurator Fiscal:
• 2 cases are scheduled for hearing in July 2024;
 1 case has resulted in a guilty plea;
 1 defendant received a 60-hour community payback order and a
compensation order of £475.
2.14.4 Sanctions Referrals to HMRC
• Financial penalties are based upon the quantity of tobacco sticks and/or
HRT found:
 Category A: £2,500 (where less than 100 packs are held)
 Category B: £5,000 (where 100 to 299 packs are held)
 Category C: £7,500 (where 300 to 499 packs are held)
 Category D: £10,000 (where 500 or more packs are held)
• Applications made:
 1 application has been made to HMRC in each of the above categories,
relating to 4 premises where seizures have been made. A further 2
seizures made on 17 July 2024 are the subject of pending applications
to HMRC in respect of Category C quantities. 
Illicit NVPs: 
2.15 The nicotine content of some ‘supersized’ vapes which we have seized contained the
equivalent of 400 cigarettes worth of nicotine, with tank sizes 5 to 10 times the legal
limit. Notably, some of the vapes seized were packaged in a manner that could appeal
to children, with flavours such as “Gummy Bear,” “Rainbow Candy,” and “Bubble-gum
Ice.” 
2.16 Vapes labelled as being ‘nicotine free’ were submitted to the Public Analyst for testing
and were found to contain nicotine. The service will raise public awareness of this
worrying development through the Council’s corporate communications team. 
3. Measures of success 
3.1  By preventing youth from accessing tobacco and NVPs, we contribute to the healthy
development of young people aged 12–18. 
3.2 We will continue to record tobacco and NVP statistics, submitting our data returns to
the Scottish Government on an annual basis. 
3.3 As a result of Trading Standards' enforcement activities there is a clearer understanding
and awareness amongst retailers in North Lanarkshire of the provisions prohibiting the
sale of tobacco products and NVPs to persons under the age of 18 years. 
3.4 The programme of test purchasing in the last financial year resulted in one banning
order and 44 FPNs being issued in respect of 24 sales of tobacco and NVPs to Trading
Standards' underage volunteers. Those sales were from 126 test purchase attempts,
Page 130 of 204

Page 131

which gives an 81% compliance rate. The service will continue to publicise our
interventions to act as a deterrent and drive up compliance in the retail sector. 
3.5 North Lanarkshire Trading Standards service continues to be one of the leading
exponents of business advice and enforcement in the area of age restricted products
in Scotland. 
4. Supporting documentation 
Appendix 1 Table of underage sales test purchasing statistics for the last 5 financial   
years.
Appendix 2 Examples of illicit NVPs seized by officers in North Lanarkshire. 
Lyall Rennie
Chief Officer (Community Operations) 
Page 131 of 204

Page 132

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 132 of 204

Page 133

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 133 of 204

Page 134

Appendix 1
Table of underage sales test purchasing (TP) statistics for the last 5 financial years 
NVPs
Year Complaints Business advice TP Total TP Fail % TP failure
2019 - 2020 0 134 38 5 13.16%
2020 - 2021 0 2 0 0 -
2021 - 2022 8 127 23 6 26%
2022 - 2023 26 109 42 12 28.60%
2023 - 2024 77 218 69 14 20.28%
Tobacco
Year Complaints Business advice TP Total TP Fail % TP failure
2019 - 2020 1 129 69 5 7.24%
2020 - 2021 3 1 0 0 -
2021 - 2022 5 107 25 6 24%
2022 - 2023 3 102 55 10 18.18%
2023 - 2024 2 193 57 10 17.54%
Page 134 of 204

Page 135

Appendix 2 
Examples of illicit NVPs seized by officers in North Lanarkshire 
Page 135 of 204

Page 136

Page 136 of 204

Page 137

North Lanarkshire Council
Report
Environment and Climate Change Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    LR/JA Date 21/08/24 
Introduction of Living Christmas Trees 
From  Lyall Rennie  
E-mail Renniel@northlan.gov.uk Telephone 07855 193500 
Executive Summary 
The purpose of the report is to advise on the investigations undertaken regarding the
installation of living Christmas Trees within all communities following the motion submitted
and agreed at the council meeting of the 28 March 2024. 
Recommendations
It is recommended that the Environment and Climate Change Committee agree: 
(1) Living Christmas trees are only introduced within towns and village where there is
an established community group for December 2025.
(2) Funding be provided through the Local Development Programme on a one-off basis
in financial year 2025/26.
(3) Future Living Christmas trees can be introduced where they are self-funded and only
within those communities identified in Appendix A.
(4) The location of living Christmas trees will be at already established locations, where
practicable.
(5) A standard tree specification is applied with the preferred option being the Blue
Spruce (Edith Version) subject to accessibility, or other suitable alternative.
(6) Alternative species that provide greater biodiversity benefits be provided where
agreed with the community group.
(7) All tasks relating to Christmas trees would be subject to full cost recovery from the
relevant community group.   
The Plan for North Lanarkshire
Priority  Enhance participation, capacity, and empowerment across our
communities
Ambition statement (20) Improve the involvement of communities in the decisions, and
development of services and supports, that affect them
Programme of Work Statutory / corporate / service requirement
Item 10
Page 137 of 204

Page 138

1. Background 
1.1 The council historically provided Christmas Trees (including associated lighting) within
town centres and villages which are listed in Appendix 1.  The size of the tree varied
depending on the local limitations and safety requirements for the area.   Christmas
Trees were erected by the councils Streetscene Service, and lighting was provided
through the existing Roads, Street Lighting and Winter Service contract with Amey
Public Services. 
1.2 At the council meeting of the 24 February 2020, it was agreed as part of the budget
process that festive lighting, which included trees and associated lighting would be
ceased, resulting in a saving of £250,000.   
1.3 At the council meeting of the 02 March 2021, a £300,000 one off investment was agreed
to ensure that Christmas Trees and associated lighting was provided within towns in
2021/22 and 2022/23. 
1.4 Between 2020 and 2023 communities have self-funded Christmas Trees and
associated lighting within their local community. However, in this time only a limited
number of trees have been erected as shown in Appendix 2.  During this time trees
have been requested for 11 locations, generally with the same reoccurring locations
each year although the number of locations has dropped from 10 in 2020 to 6 in 2023. 
1.5 From 2020 to 2023 the cost of providing trees (not including installation) has increased
significantly with 6.1m, 7.6m and 9.1m trees increasing in cost by 43%, 49% and 73%
respectively. The delivery costs of trees have also increased by 62% during this period. 
The cost of work through the existing Roads Street Lighting and Winter Service contract
with APS LLP, including installing lighting, undertaking repairs etc. has also increased
by 24% during this period.   
2. Report 
Council Motion 
2.1   At the council meeting on the 28 March 2024 a motion was put forward and agreed: 
2.1.1 To investigate the potential to plant ‘Living Christmas Trees’ as a cost effective
and environmentally friendly option across North Lanarkshire Towns and
Villages.  Following the recent appointment of a Project Development Officer
/(Trees) and receipt of £1m of one-off funds, this would form part of the
operational plan to guide replanting and further guided by the Climate Forest
work on urban tree canopy across all Council Wards. 
2.1.2 That it be noted that the living Christmas Trees would be a substantial size,
2.5m to 3m tall, with the cost of a containerised/ root balled tree in the region
of £1,100. 
2.1.3 Furthermore, environmentally friendly lighting options such as solar lighting
will be explored to keep ongoing maintenance and costs down; All of which
would be subject to consultation with Community Boards, in conjunction with
the Community Partnership Officers and Land Management Teams, to identify
Page 138 of 204

Page 139

appropriate streets or parks for placement of these Christmas Trees to be
enjoyed by future generations. 
Planting and future maintenance 
2.2 It is essential that trees are planted at the correct time of the year which would normally
be Autum or Early Spring.  Planting nearer to the summer months is likely to introduce
a need for enhanced tree watering until the trees are established.  By way of an
example watering of 48 avenue trees recently incurred costs of around £650 and given
the travel time between the living trees it is likely that these costs would increase. 
2.3 Although living trees will reduce reoccurring costs for the community it is worth noting
that whilst a tree may be 4.5m when planted, the trees can grow quickly given the right
conditions.  The table below shows the typical common species of trees that are used
for outdoor Christmas Trees, their maximum average height and approximate growth
rate per year.   
Species  Average Max
Height in UK
Approx growth rate per year 
Norway Spruce 40 - 50m Can grow up to 1m per year early in life 
Blue Spruce  15m  Up to 60cm per year. The variety ‘Edith’ is a dwarf
Blue Colorado Spruce that grows to about 3 meters
in height and 2.5 meters in spread over 20 years.
Nordmann Fir 20m  Slow growing up to 30cm per year 
2.4 Given the growth rate and significant height that can be reached by a Norway Spruce
it would not be considered appropriate to plant this type of tree.  The Blue Spruce and
Nordmann Fir are slower growing and can be sourced easily.  However, the Edith
variety would be the preferred choice due to the smaller size, which enables it to be lit
and decorated more easily and reduces the health and safety risks associated with
these tasks.  That said it may be difficult to source a standard sized tree. 
2.5 There will be a requirement to water each tree during the summer months for the first
two years of planting.  This is likely to result in a cost of £150 per tree each year.  The
trees would be inspected and remediated in future years as part of the ongoing Tree
Asset Management strategy. 
2.6  Following the establishment of the trees any trees that are damaged or diseased may
require to be removed and there is no guarantee that any replanting will be done on a
like for like basis, or that the same location would be used. 
2.7 It should be noted that although the motion considers this type of individual planting to
be in keeping with the Council’s commitments under the Clyde Climate Forest, planting
individual trees of these species would not conform to the expectations of the project
and does not conform to the principal of ‘right tree, right place’.  In these more urban
locations, species selection would ideally include hardy species that have shown
resistance to pollution (silver birch or sycamore for example). 
Page 139 of 204

Page 140

Alternative Species 
2.8 Consideration could also be given to planting alternative species such as Holly, Scot’s
Pine, or Hornbeam Fastigia as they provide greater benefits in terms of biodiversity. 
However, they do not have the appearance of a typical Christmas tree. 
Health and Safety  
2.9 When the council install trees and tree lighting, we use contractors who have
experience in undertaking this task and they use the correct access measures to
ensure any lights at height can be installed safely.  Whilst some communities have
access to this type of equipment and have relationships with contractors/ suppliers this
does not apply to every community.  It is therefore important that where living trees are
established safe installation methods are agreed with each community group.
Estimated costs for Living Trees 
2.10 For a ready to plant Tree measuring 4.5m the cost would be in the region of £800 which
includes the purchase and installation.  Adding the watering costs identified in
paragraph 2.5 would mean the cost of planting and establishing a living tree would be
in the region of £1,100.   
2.11 Assuming a suitable location can be established for all locations identified in Appendix
1, the cost of Installing trees within the 35 communities would be in the region of
£38,500.  This base cost could increase for locations where a tree has never been
provided depending on any other preparatory work.  The cost does not include
provision for traffic management as this would be site specific and trees would ideally
be located away from the road network. 
2.12 An Enquiry has been made through the council’s existing roads contractor regarding
the availability of commercial standard LED lighting for outside use.  The feedback is
that lighting levels in Scotland during the winter months is insufficient to illuminate lights
through the winter period and as such any LED solution would require a battery backup. 
It would also appear that there is no off the shelf product available at present. 
Therefore, each community group could procure their own LED lighting or mains
connected lighting could be provided through the council’s roads contractor, for either
option, the costs would be met by the community group.   It should be noted that lighting
is normally wrapped around the tree limbs, and where lights are left in-situ, as the tree
grows there is a risk that the lighting is damaged and any costs for replacement or
additional lighting would require to be met by the Community.  
2.13 Although most locations have a current power supply, there are some where this is not
the case and in those instances the community group would require to meet the costs
of installing the necessary infrastructure, including connection to the Scottish Power
network. 
2.14  Although solar lighting would help to reduce the cost burden on communities, this
saving is mainly due to removing the requirement for electrical testing, repairs to circuits
and installation of fuses and not energy consumption.   
2.15 When trees have been installed in previous years, low energy LED lighting is used,
each tree will generally have 6 strings of LED’s that have a wattage of 9.4w per string,
56.4w per tree.  Based on 35 days of operation and the 2023/24 energy costs this
equates to under £6 per tree. 
Page 140 of 204

Page 141

2.16 It is assumed that any tree lighting is installed and dressed by the community, where
this is not the case the work could be sourced through the council’s Roads and
Infrastructure Improvement Contract.  Community groups would require funding for this
work that would be carried out at contract rates.  
Proposals 
2.17 Given that trees have been installed at specific locations for several years, it would be
proposed that any living tree be placed at these established locations and limited to
those communities identified in Appendix 1.   
2.18 As town centres do not generally have active community groups, this is likely to be a
barrier to establishing living trees within these areas.  Town centre locations are also
not considered to be the most appropriate locations for single trees, as these may be
more susceptible to damage caused by weather as they do not have the same
protection as a small woodland would provide. It is therefore not proposed to install
trees within town centre locations. 
2.19 It is proposed that a single specification be used for all trees with the preferred option
being the Blue Spruce (Edith Version) subject to accessibility, or other suitable
alternative.  Alternative species would be considered where they provided greater
benefits in terms of biodiversity. 
Community Ownership 
2.20 Whilst the council motion relates to the establishment of living trees within all towns and
villages it is essential that community ownership is established for each location.  It is
important to highlight that not every community has an active group that have the
capability/ capacity to take ownership of an established tree. 
2.21 The community would be responsible for meeting all costs associated with the tree
following establishment.  This will include items such as storage, erection and removal
of lighting, dressing trees.  The community would also be responsible for meeting costs
incurred by the council for attending issues with the tree such as vandalism/ damage. 
Funding 
2.22 The installation of living trees will cost in the region of £38,500.  This will be funded
through the Local Development Programme (LDP).  This is subject to there being an
active community group who would take responsibility for the tree and associated costs
as outline in paragraph 2.20 and 2.21. 
2.23 It should be noted that the funding identified above is based on a one off for financial
year 2025/26 and there would be no financial support from the council beyond this
period.  Any living trees installed after 2025/26 would require to be fully funded by the
community.   
3. Measures of success 
3.1  Where the offer of a one-off tree is taken up, communities would continue to have a
festive display, albeit a living tree with solar lighting that they are responsible for
maintaining. 
Page 141 of 204

Page 142

3.2 Trees would be inspected through the Council’s Tree Asset Management Strategy and
remediated / removed where required, therefore continuing to reduce any risks
associated with the Council’s tree stock.   
4. Supporting documentation 
Appendix 1  List of historic Christmas tree locations, size of trees 
Appendix 2  List of locations where trees have been self-funded from 2020 to 2023. 
Lyall Rennie
Chief Officer Community Operations 
Page 142 of 204

Page 143

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☐ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
Page 143 of 204

Page 144

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 144 of 204

Page 145

Appendix 1 
Location
Tree Size
Installed
Located in
Open
Space Comments        
Town Centres     
Airdrie 7.6m no Street tree could be relocated
Bellshill 7.6m no Street tree could be relocated
Coatbridge 9.1m no Street tree could be relocated
Cumbernauld (No tree in
town centre placed in
Cumbernauld Village)
7.6m
yes  On banking at memorial 
Kilsyth 7.6m yes  Located in grass area 
Motherwell civic centre  12.2m yes  Could be planted on site/ remove socket. 
Motherwell town centre  9.1m no Street tree could be relocated
Shotts 7.6m yes   
Wishaw 7.6m yes  Street tree could be relocated        
Villages      
Allanton 9.1m yes  Placed on church grounds 
Bonkle 9.1m yes  Located in grass area
Cambusnethan 7.6m yes  Located in a shrub bed
Carfin 6.1m yes  Located in grass area
Chapelhall 7.6m yes  Located in a shrub bed
Cleland 6.1m yes  Located in grass area
Coltness 6.1m yes  Located in grass area
Condorrat 6.1m yes  Located in grass area
Craigneuk 7.6m yes  Located in grass area
Cumbernauld Village 7.6m yes   Located in grass area
Glenboig 6.1m yes  Located in a shrub bed
Glenmavis Living Tree N/A At church and between Raebog Rd and Crathie Dr  
Greengairs No tree N/A Tree never provided
Harthill & Eastfield 6.1m yes  Located in a shrub bed
Holytown No tree N/A Tree never provided
Moodiesburn 7.6m yes  Located in grass area
Morningside No tree N/A Tree never provided
Mossend 9.1m yes  Located in grass area
Muirhead 7.6m yes  Located in a shrub bed
Netherton 7.6m yes  Located in grass area
New Stevenson No tree N/A Tree never provided
Newarthill 6.1m yes  Located in grass area
Newmains 9.1m  
On a roundabout in a socket could be moved to
shrub bed , depth <
Overtown Living Tree N/A They have a living Christmas tree at the church
Plains 7.6m yes Located in grass area
Page 145 of 204

Page 146

Salsburgh 7.6m yes  Located In Jubilee Gardens 
Stepps No tree N/A Tree never provided
Viewpark 7.6m yes  Located in a shrub bed
Waterloo 6.1m yes  Located in grass area
Bargeddie 7.6m yes  Located in grass area
Pather 6.1m yes  Located in grass area
Abronhill  4.6m no Inside shopping centre no suitable location 
Caldercruix (Insitu) Living Tree N/A  
Croy (Insitu) Living Tree N/A  
Upperton No Tree N/A  Tree never provided 
Page 146 of 204

Page 147

Appendix 2 
Self-funded tree provision from 2020 to 2023. 
2020 2021 2022 2023
Bellshill Cross Cleland Caldercruix Cleland
Cleland Coltness Cleland Craigneuk
Coltness Harthill Coltness Moodiesburn
Craigneuk Moodiesburn Craigneuk Muirhead
Harthill Muirhead Moodiesburn Newarthill
Muirhead Newmains Muirhead Newmains
Netherton  Newmains 
Newarthill   
Newmains   
Shotts   
Page 147 of 204

Page 148

Page 148 of 204

Page 149

North Lanarkshire Council
Report
Environment and Climate Change Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    LR Date 21/08/24 
Land and Waste Service Review 
From  Lyall Rennie, Chief Officer (Community Operations)  
E-mail renniely@northlan.gov.uk Telephone 07855 193500 
1. Background 
1.1 On 1st December 2022, the Policy and Strategy Committee approved a governance
update to the Council’s One Place One Plan approach which resulted in the majority of
the services previously retained within the Environmental Services team (Street
Executive Summary 
The Policy and Strategy Committee approved a governance update to the Council’s One
Place One Plan approach on 1st December 2022, resulting in the creation of the Community
Operations service.  A further review was carried out and changes which included Land
and Waste sitting under one Business Manager was reported to the Environment and
Climate Change Committee on 1 November 2023.   
The purpose of this report is to provide Members with an update on the service review now
being undertaken across the Land and Waste services.   
Recommendations
It is recommended that the Environment and Climate Change Committee: 
(1) Supports the progress made on the Land and Waste Service Review and the
outcome from the employee consultation. 
(2) Agrees that a further report is submitted to Committee on 30 October 2024, providing
further detail on the preferred operational change and outlining the associated
efficiency saving. 
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (17) Ensure we keep our environment clean, safe, and attractive
Programme of Work Sustainable Futures
Item 11
Page 149 of 204

Page 150

Cleaning, Grounds Maintenance, Cemetery Services, Roads Maintenance Operations,
Greenspace and Country Parks for the Future) being merged with those within
Regulatory Services and Waste Solutions, resulting in the creation of the Community
Operations service.  There then followed a review of the overall deployment of these
service areas and their line management allocation, and an update was reported to
Environment and Climate Change Committee on 1st November 2023 which included
Land Services and Waste Services sitting under a single business manager. 
1.2 Following changes to the reporting structure, a review is underway into the working
areas across Land and Waste services, the outcome of which will be to deliver
operational efficiencies and improved outcomes. 
2. Report 
2.1 The initial stages of the review have identified inefficiencies in service delivery,
including staffing levels and vehicles. 
2.2 These inefficiencies can be attributed, in part, to current shift patterns.  A preliminary
review has indicated that a change will deliver significant improvements, ensuring more
efficient use of resources, fully optimised routes and reduction in costs related to the
current working arrangements. 
2.3 The initial stages of the review will focus on waste collection routes with phase two of
the review focussing on the overall structure across Land and Waste services. This
report focuses exclusively on the waste collection routes. 
2.4 A full options appraisal was carried out in respect of waste service delivery models with
the most feasible options being taken forward for consultation with trade union
representatives and employees.   
2.5 The service engaged with trade union representatives early in the process. Initially
weekly meetings were implemented, and the frequency reduced as negotiations
progressed. Further, trade union representatives and human resource managers were
invited to attend the consultation events for employees to allow any employee to seek
advice in relation to their personal circumstances. 
2.6 Consultation with employees was carried out on a one-to-one basis.  In advance of
meetings all employees were provided with notification of meetings, option forms and
a question-and-answer sheet. 
2.7 Meetings took place throughout June and out of 231 employees only 13 employees
were unable to attend in person due to sickness absence.  These individuals were
contacted by telephone and the proposals explained.  The paperwork was posted out
with a return envelope for their completed option form.   
2.8 Of the 231 employees affected, 90% of employees returned completed option forms.
From this feedback, 78% have indicated a preference to move to a 4-day week.  Table
1 below provides a breakdown of the outcome of the employee consultation exercise. 
Table 1 – Employee Consultation Outcome
Proposed Shift Pattern No. of responses %
Tuesday to Friday 117 51
Monday to Thursday 47 20 
Page 150 of 204

Page 151

Monday to Friday 14 6
Monday to Friday or Tuesday to Friday 1 0
Monday to Thursday or Tuesday to Friday 1 0
Monday to Friday or Monday to Thursday 1 0
All 3 options 5 2
No change 23 10
Nil return 22 10
TOTAL 231 100 
2.9 From the table above, it is clear that there is a definite preference for a move to a four-
day working week. This option (irrespective of the 4-day pattern) aligns with the
preferred option by the management team of the service. Initial projections on this
option have demonstrated that this could deliver a more efficient service and release
an annual revenue saving of circa £1million.  
2.10 It should be noted that the potential impact on residents, will be minimal. There will be
no change to current waste streams or collection frequencies and the only change will
be the day of collection for a proportion of properties. The service will endeavour to
keep this to a minimum; however it is likely a high number of properties will be affected. 
2.11 It is fully recognised that should it be agreed to change the collection schedule, then a
full communications strategy will require be developed to ensure all key stakeholders
are fully informed and engaged. 
2.12 The service will now prepare a more detailed report for Committee fully outlining its final
proposal and including details of the level of efficiency saving together with details on
the revised collection routes etc. This update report will be submitted to Committee on
30 October 2024.   
3. Measures of success 
3.1  Improvement in the efficiency of waste collection routes. 
4. Supporting documentation 
No supporting documents. 
Lyall Rennie
Chief Officer (Community Operations)  
Page 151 of 204

Page 152

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
Although there are no impacts with this report, it is fully expected that a revenue
saving in the region of £1 million could be achieved if the service was to move to a
four day working week. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
Not at present but colleagues within HR will continue to be fully engaged with this
process when drafting the final proposal for a move to a different shift pattern. 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Page 152 of 204

Page 153

Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 153 of 204

Page 154

Page 154 of 204

Page 155

North Lanarkshire Council
Report
Environment and Climate Change Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref LR/JA Date 21/08/24 
Amey Public Services LLP: Operational Performance Monitoring
Report for 01 November 2023 to 31 March 2024, Financial
performance at 31 December 2023 
From  Lyall Rennie, Chief Officer (Community Operations)  
E-mail renniely@northlan.gov.uk Telephone 07855 193500 
1. Background 
1.1 The council created the roads, street lighting and winter maintenance services LLP in
2010, following a tender exercise for a strategic partner to deliver such services over a
ten-year period. The successful bidders were Amey Local Government Limited and the
contract commenced on 14 December 2010. Amey LG Ltd (now Amey Public Services
LLP) owns a 67% shareholding in the strategic partnership with the council owning the
remaining 33%. 
Executive Summary 
This report outlines Amey Public Services (APS) Limited Liability Partnership (LLP)
performance against its’ business objectives and council priorities for the period October
November 2023 to March 2024 and its’ financial performance to December 2023.
Recommendations 
It is recommended that the Environment and Climate Change Committee: 
(1) Acknowledge APS LLP’s operational performance up to 31 March 2024, along with
service delivery highlights over the past 6 months.
(2) Acknowledge APS LLP’s financial performance at 31 December 2023. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (17) Ensure we keep our environment clean, safe, and attractive
Programme of Work Statutory / corporate / service requirement  
Item 12
Page 155 of 204

Page 156

1.2 A Management Committee consisting of representatives from both APS and North
Lanarkshire Council is responsible for the LLP’s governance, which includes
operational delivery and management, staffing, financial control and reporting, health
and safety, performance monitoring and risk management. The Management
Committee meets quarterly, with council representation consisting of one senior officer
and one Elected Member, and APS LLP membership comprising up to four
representatives. 
1.3 As per the Works Agreement, service reviews required to be carried out jointly at year
4 and 8 of the strategic partnership. The former Planning and Transportation Committee
considered the findings of the Year 4 review and approved the requirement for the
council to continue working with APS LLP to identify opportunities for the business to
establish a stable financial position. 
1.4 The Year 8 review commenced in July 2018 with the outcome initially reported to the
former Infrastructure Committee in November 2018, but then carried forward to former
Policy and Resources Committee in December 2018. The review recommended that
the then Head of Environmental Assets conduct a market testing exercise to identify
whether amending some of the existing contract rates and prices for a term beyond
June 2021 will be more beneficial to the council than ceasing the contract at its natural
termination date. 
1.5 The results of the market testing demonstrated that amending APS LLP rates provided
value for money and recommended that the contract be extended for a period up to
June 2024. The extension to the contract was reported to and approved by the former
Environment and Transportation Committee in August 2019. 
2. Report 
2.1 This report confirms where Amey Public Services LLP are fulfilling its contractual
obligations and meeting the council’s service delivery expectations, as well as providing
information from Financial Solutions on financial performance and overall financial
standing within the company. This information will help give early warning of any
financial risks which may give rise to operational or reputational risks for the council. 
Performance Indicators 
2.2 Operational and financial performance is reported to this Committee after it has been
considered by the Amey Management Committee. This provides Management
Committee representatives with the opportunity to address any issues which require
attention and thereafter, allows this Committee to receive the updated position,
including any remedial actions where these may be required. 
2.3 The outcomes from the 2023-24 and the forecast for 2024-25 performance indicators
are detailed within appendix 1. 
Overview of Governance Arrangements 
2.4 APS LLP satisfies the council’s required oversight arrangements, and routinely submits
the monitoring information expected by council officers in line with the timeframes
specified within the LLP Agreement. 
Comments, Compliments and Complaints 
Page 156 of 204

Page 157

2.5 During this reporting period APS received 1 compliment this was a letter of thanks from
Glenboig Community Garden for social value support given in July 2023. 
2.6 During this period APS received 2 complaints relating noise nuisance at Glen Fyne
Road and the failure of traffic signals at Wardpark in Cumbernauld. 
Service Delivery Highlights 
2.7 The following service delivery highlights were achieved during this period:- 
• Completed the 2023/24 carriageway resurfacing programme.
• Completed the LED replacement programme which was focused on 90% of the
existing street lighting assets.
• Since the start of April 2023 carried out cyclic gully cleaning, attending 14,660
gullies and cleansed 13,445 with additional visits required for those not cleaned
due to parked vehicles, jammed lids etc.  
• Completed the construction of Newhouse to Salsburgh active travel route.
• Completed junction improvements at A73 Carlisle Road/ Brownsburn Road,
Airdrie.
• Completed footway widening and traffic signal refurbishment at A721 New
Edinburgh Road, Uddingston.
• Completed first phases of junction improvements and footway widening at
Paddock Street/ Sikeside Street, Coatbridge and commenced phase 3 of works.
• Completed bus infrastructure improvements with Airdrie at 36 bus stops.
• Commenced footway widening, traffic calming and carriageway and footway
resurfacing at Meadowhead Road, Wishaw.
• Commenced junction improvements at Cumbernauld Road/ Lenzie Road/
Cardowan Road. 
2.8 APS staff have also undertaken several activities in support of the local and wider
community: 
• In October 2023, the Blairlinn depot organised an event to raise funds for breast
cancer.  This event was a success and raised almost £2,000.
• In November 2023 staff at the Bargeddie depot supported Bargeddie Primary
School’s collection for Coatbridge footbank.  APS donated four boxes of
foodstuffs for the collection with a value of approximately £250.
• In December 2023 staff supported the Save the Children Christmas Jumper day
raising approximately £500 on the day. 
Business Development 
2.9 A key aim of the contract is to encourage business development. During this period
APS were successful in the following: 
• Supporting Renfrewshire council with a review of its street lighting maintenance
services and identify areas for improvement. 
Financial Impact 
Public Accountability Obligations – Financial year 2023/24
2.10 To satisfy the Council’s duty to ensure the organisation delivering roads, street lighting
and winter services on its behalf is financially sound, the Council’s Section 95 Officer
Page 157 of 204

Page 158

maintains appropriate and proportionate processes and procedures for scrutinising
APS LLP’s financial performance. 
2.11 The Council’s Legal Agreements with APS LLP specify the financial information which
must submit to the Council including an annual business plan, monthly management
accounts, audited financial statements etc., to enable Finance to assess and report any
financial risk likely to arise as a result of the Council using APS LLP to deliver these
services.
2.12 The Council expends both revenue and capital resources annually with APS LLP to
deliver services which assist the Council in achieving its priority outcomes.  For the
Councils financial year 2023-24, sums of £12.504m and £9.055m were budgeted in
respect of revenue and capital respectively for roads and lighting maintenance.  APS
operates a financial year ending 31 December 2023 and revises its forecast twice
throughout the year.  Based on APS Reforecast Budget 2, works from the Council
represent around 91.37% of annual anticipated net turnover. 
Financial Performance as at 31st December 2023
2.13 Based on their financial statements to 31st December 2023, members will wish to note
the LLP is reporting a provisional annual accounting deficit of £0.469m, which is an
adverse variance of £0.587m to the budgeted forecast profit of £0.118m.  This is
primarily due to increased volume of capital works and winter maintenance resulting in
higher than anticipated employee, materials and plant and vehicle costs. Appendix 2
provides further details regarding the LLP’s financial position as well as commentary to
explain the key variances reported.   
2.14 Although the contract provides scope for the Council to receive dividends from this
partnership agreement, the cumulative negative trading position evidenced in the
balance sheet means the LLP has not yet had an opportunity to declare any dividends.
2.15 In return for satisfactory service delivery and effective financial performance through
the LLP, Amey Local Government Limited is entitled to receive a management fee
which comprises both fixed and variable elements and is partially linked to level of
works delivered through the contract.  However, the payment of the management fee
is dependent upon generation of cumulative profits and given the LLP currently has
cumulative net liabilities, the management committee has agreed that no management
fee is payable for 2023.
Overall Financial Standing – Balance Sheet as at 31st December 2023
2.16 Appendix 3 provides key balances to give members an update on the overall financial
standing of the company, as at 31st December 2023, along with the previous year’s
comparator figures.  Key balances and indicators worthy of specific note include: 
2.16.1 The company has cumulative net liabilities of £6.095m predominately due to
the reliance on the approved parent loan and timing of payroll transactions
between the group.  This is an adverse movement on the previous year position
of £0.470m. 
2.16.2 The LLP has a long-term liabilities balance of £7.718m, which predominantly
reflects the parent loan of £6.575m and timing of payroll transactions between
the group of £0.871m which are provided by the parent company Amey LG to
enable the LLP to continue delivering services.  In recognising the LLP is largely
dependent upon the support received from the parent company, officers from
Page 158 of 204

Page 159

Finance regularly obtain assurances from the LLP and Amey LG regarding their
continued loan support. 
2.16.3 A comparison of the LLP’s current assets to its current liabilities equates to a
net current asset of £1.622m.  Members should be assured that the company
has sufficient resources to meet its current obligations, however it should be
noted that the company continues to rely heavily on the approved parent loan
as detailed in above. 
Approved Budget 2024
2.17 Members should note that the 2024 budget is part year and has been prepared based
on the current partnership agreement ending in May 2024.
In line with Amey group timelines, the 2024 budget indicates an anticipated accounting
surplus position of £0.328m on turnover of £7.994m.  Based on APS budget, works
from the Council represent around 81% of annual anticipated net turnover.
2.18  Appendix 4 provides detail on the 2024 budget which has been prepared to May 2024
as outlined in section 2.17.  For comparison purposes the 2023 budget has been shown
both as the full annual budget and the 5-month budget to May 2023. 
3. Measures of success
3.1  These reports are intended to give Members an insight into how the LLP is performing
and where it is supporting delivery or adding value to the council’s priorities. 
4. Supporting documentation 
Appendix 1  Performance Indicators & Outcomes 
Appendix 2  Financial Performance as at 31 December 2023
Appendix 3  Overall Financial Standing – Balance Sheet as at 31 December 2023
Appendix 4  Approved Budget 2024 – (based on the cessation of the current LLP
May 2023) 
Lyall Rennie
Chief Officer (Community Operations) 
Page 159 of 204

Page 160

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 160 of 204

Page 161

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 161 of 204

Page 162

Appendix 1  
Performance 
Service Area  Target Outcome/Purpose  2023/24   
Actual 
2024/25 
Target 
2024/25
Actual 
Comments 
Improve economic opportunities and outcomes 
OBJECTIVE: Improve infrastructure to help current and incoming businesses to grow and create employment, help current and incoming businesses to grow
and create employment 
Street Lighting 
Activities 
To enable vulnerable people to feel
safe in their local area  97.37%  95%  TBC 
This performance target includes measures related to:
Works Outstanding, Works Quality, Dispute Resolution,
Dark Street Lamps & Works Registration Compliance
(SRWR). 
Roads Works
Activities 
Contribute to the long-term economic
sustainability of North Lanarkshire  97.23%  95%  TBC 
This performance target includes measures related to:
Works Outstanding, Works Quality, Dispute Resolution
& Road Works Registration Compliance (SRWR). 
General
Performance 
Contribute to the long-term economic
sustainability of North Lanarkshire  78.51%  95%  TBC
This performance target includes: Reinstatement
Compliance, Remedial Works Compliance, Prompt
Payment to Suppliers, Public Complaints & Health and
Safety Compliance. 
General Performance – Performance is below the target of 95% this relates to the time being taken for APS to make payment to their supply chain, the
number of street lighting reinstatements meeting the specified standards and remedial work not completed within the maintenance period.  All these issues
have been raised with APS. 
Page 162 of 204

Page 163

Appendix 2 
Page 163 of 204

Page 164

Appendix 3 
Page 164 of 204

Page 165

Appendix 4 
Approved Budget - 2024 (based on cessation of the current LLP May 2024)
2023 2023 2024 Commentary 2023
Annual
Forecast
(RF2)
Annual
Forecast
(RF2)
to May
2023
Budget
to May 2024
Movement
May 2023 v
2024
Provisional
Outturn
£m £m £m £m £m
Income from NLC 16.969 8.260 6.487 (1.772) Decrease in Revenue & Capital funding due to cessation
of current LLP arrangement. 20.051
Strategy WIP (net of
provision) (0.278) 0.035 0.045 0.010 Write down strategy 0.598
Other 3rd party income 1.881 0.238 1.462 1.224 Increased income from other clients inc. other local
authorities 0.871
Total Income 18.573 8.532 7.994 (0.538) 21.520
Expenditure;
Employee costs (7.073) (3.223) (2.696) 0.527 (8.221)
Sub-contractor costs (2.472) (1.245) (0.645) 0.600 (3.291)
Materials (3.435) (2.016) (1.126) 0.890 (5.561)
Plant & Vehicle costs (4.636) (1.606) (2.759) (1.153) Increased costs associated with internal hires within
Amey Group. (3.984)
Property,
Communications &
Other
(0.840) (0.230) (0.440) (0.210) Increased costs predominately associated with rates. (0.931)
Total resources
expended (18.455) (8.321) (7.666) 0.655 (21.988)
Trading profit/(loss) 0.118 0.212 0.328 0.116 (0.469)
Management Fee 0.000 0.000 0.000 0.000 0.000
Net profit/(loss) 0.118 0.212 0.328 0.116 (0.469)
Amey Public Services LLP
Income &
expenditure
Decrease is a result of 2024 budget being based on the
cessation of the current LLP (May 2024)
Page 165 of 204

Page 166

Page 166 of 204

Page 167

North Lanarkshire Council
Report
Environment & Climate Change Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    LR Date 21/08/24 
Annual report on the performance of North Lanarkshire Council
from the Scottish Roadworks Commissioner 
From  Lyall Rennie, Chief Officer (Community Operations)  
E-mail renniely@northlan.gov.uk Telephone  07855 193500 
1. Background
Executive Summary
The Scottish Road Works Commissioner oversees improvements to the planning,
coordination and quality of road works by both local authorities and statutory undertakers
in Scotland. The Council has a Duty under section 118(1) of the New Roads and Street
Works Act 1991, to co-ordinate the execution of works of all kinds in roads for which they
are responsible. This report presents Elected Members with details of the Scottish Road
Works Commissioner’s Performance Review in relation to Road Works undertaken by
North Lanarkshire Council during 2023/24. 
The Transport (Scotland) Act 2019 introduced new legislative reform measures to further
improve the regulation of road works in Scotland. These new measures are now being
implemented following delays, mainly due to Covid. 
Recommendations
It is recommended that the Environment and Climate Change Committee: 
(1) Acknowledge the Service’s operational performance between 1 April 2023 and 31
March 2024 as outlined within the Scottish Road Works Commissioner’s Annual
Report and;
(2) Recognise the resource implications due to the ongoing implementation of the
Transport (Scotland) Act 2019
(3) Acknowledge the arrangements for securing an improved level of performance from
all utility companies. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (17) Ensure we keep our environment clean, safe, and attractive
Programme of
Work Statutory / corporate / service requirement
Item 13
Page 167 of 204

Page 168

1.1 The Scottish Road Works Commissioner is an independent public official established
under section 16 of the Transport (Scotland) Act 2005 and is accountable to the
Scottish Ministers and ultimately the Scottish Parliament. The Commissioner's aim is
to improve the planning, coordination, and quality of road works throughout Scotland. 
1.2 This Report updates the Committee on the performance of North Lanarkshire’s Roads
Service following the publication of the annual performance report by the Scottish Road
Works Commissioner for 2023/24. 
1.3 The Scottish Parliament voted to pass the Transport (Scotland) Bill on Thursday 10
October 2019. The Bill received royal assent on 15 November 2019 and became the
Transport (Scotland) Act 2019. The Act consists of 10 Parts and introduces new
measures across a range of transport related disciplines. The current and future
implications of Part 9 (Road Works) are outlined within this Report. 
2. Report 
2.1 The Commissioner monitors performance, promotes and encourages good practice
across both utility companies and roads authorities. The Commissioner also has
powers to impose financial penalties on roads authorities who systematically fail in their
duty to co-ordinate and upon statutory undertakers who systematically fail to co-operate
when undertaking road works. 
2.2 Responsibility for the day-to-day management and co-ordination of works undertaken
on roads is as follows: 
• North Lanarkshire Council, as the Roads Authority, has a duty to co-ordinate all
road works carried out on any road for which they are responsible;
• The reinstatement of road surfaces remains the responsibility of the party
undertaking the works. The roads authority has powers to inspect road works to
ensure that statutory undertakers (typically utility companies) fulfil their obligations;
• Traffic management at road works (cones, signs and barriers) is the responsibility
of the party undertaking the works; and
• The roads authority is responsible for any decisions related to the repair and
maintenance of their roads. 
2.3 All works undertaken within the Public Road in Scotland require to be noticed in
accordance with the conditions and timescales as set out in the New Roads and Street
Works Act 1991 and associated Codes of Practice. All works must be recorded on the
Scottish Road Works Register (Aurora). Any proposed works entered onto the Aurora
system without the requisite information, or out-with the prescribed timescales (both
prior to and after the works are undertaken) will incur a ‘noticing failure’. 
2.4 The Office of the Scottish Roadworks Commissioner issues annual performance review
letters to all works promoters in Scotland. Any organisation that fails to meet the
identified performance figures may be required to meet with representatives from the
Commissioner’s office to discuss the figures in greater detail. 
Page 168 of 204

Page 169

2.4.1  The aim is to balance the statutory rights of road works authorities and
undertakers to carry out works, with the expectation of road users that disruption
from works shall be kept to a minimum. 
2.4.2 The Commissioner has the Power to issue a Penalty of up to £100,000 to
organisations who persistently fail to comply with the requirements of the Act
and / or secondary legislation. 
2.5 As a result of the Covid-19 pandemic, most road operations, utility works and new
construction / development was suspended in the early part of 2020. The Service has
continued to note an increase in the number of requests for work, resulting in higher
competition for road-space. 
2.5.1 The telecommunications sector has seen a significant increase in installation of
new services. This includes the replacement of copper cables with fibre optic
services and within North Lanarkshire, the roll out of the digital infrastructure
transformation project. 
2.6 Performance levels in recent years have generally been to a high standard. In 2019/20
the Report stated that in relation to works planning and operational functions, ‘North
Lanarkshire’s performance sets an example to other roads authorities’. 
2.7 Performance in 2022/23 was summarised as: 
‘Overall, the road works performance of North Lanarkshire Council was well-managed
during 2022/23. This continues the good management from the 2021/22 reporting year
and I acknowledge your continuing commitment.’ 
2.8 Performance in 2023/24 was summarised as: 
‘Overall, the road works performance of North Lanarkshire Council was satisfactory
during 2023/24. I expect to see increased efforts to deliver a well-managed
performance in 2024/25.’ 
2.9 The primary reason for the reduction in overall performance was due to the more
stringent requirement in noticing regulations implemented through the Transport
(Scotland) Act 2109 on 1 April 2023. 
2.9.1 On the 01 July 2023, the requirement to record start / stop notices within both 2
hours of the work starting and being completed on site was formally introduced.
This change seeks to improve the provision of more accurate information to all
road users going forward and has required changes in working practices for
both the Roads Service and Amey Public Services LLP to ensure compliance. 
2.9.2 Training was provided to both internal officers and Amey Public Services
operatives in advance of the new requirement. However, both parties initially
struggled to implement the operational changes, primarily due to difficulties in
sub-contractor compliance and a lack of mobile devices on the operational side.
There were also issues identified around public holiday periods. This initially
resulted in a significant number of notice failures in quarter 2, followed by
gradual improvement throughout the remainder of the year.   
Recent North Lanarkshire Council Performance
Page 169 of 204

Page 170

2.9.3 Overrunning Works were also identified as an area requiring improvement.
These occur when the works take longer than anticipated due to unforeseen
circumstances, and where the responsible officer fails to apply for a notice
extension within the required timeframe. Performance sharply declined for this
indicator in Q2 2024, potentially due to an unanticipated consequence of the
change to the completion notice requirements within 2.9.1 above. Following
investigation, further training was undertaken with all relevant officers and
contractors to address this issue.       
2.10 Performance in Quarter 4 shows that noticing performance was back within the
Commissioner’s expected performance range where it is anticipated to remain going
forward, due to the additional resources and procedures now in place. The Service are
focused on minimising the risk presented during the forthcoming transition to the Roads
and Infrastructure Enterprise Contract. 
2.11  In depth analysis of the Council’s performance is detailed in Appendix 2 and includes
the following key indicators:- 
• Noticing failures; 
• Works stated and completed;
• Overrunning Works;
• Fixed Penalty Notices issued to Statutory Undertakers;
• Sample inspections undertaken on Statutory Undertakers works.   
2.12 The Transport (Scotland) Act 2019 was designed to help make Scotland’s transport
network cleaner, smarter and more accessible than ever before - aiming to empower
local authorities and establish consistent standards to tackle current and future
challenges, while delivering a more responsive and sustainable transport system for
everyone in Scotland. The Act consists of 10 Parts although only Part 9 (Road Works)
is considered within this Report. 
Transport (Scotland) Act 2019 – Road Works
Page 170 of 204

Page 171

2.13 The Act amends the 2005 Transport (Scotland) Act and strengthens the status of the
Scottish Road Works Commissioner. The Commissioner now has powers of direction
through compliance notices, power to issue increased fixed penalty notices (£100,000,
previously £50,000), an inspection function and new inspection powers.  The provisions
also cover signing, lighting and guarding at road works sites, safety measures, the
qualifications of roads authority workers, reinstatement quality plans, information about
apparatus and commencement and completion notices. 
2.14 Significant changes included the mandatory requirement for Roads Authorities to fully
comply with the Code of Practice for Safety at Street Works and Road Works and a
mandatory requirement that roads authorities’ supervisors and officers have relevant
qualifications. Training has been provided for all relevant Officers to ensure
compliance. 
Page 171 of 204

Page 172

2.15 From 1 April 2024, the Act makes provision for the Commissioner to issue Compliance
Notices where specific duties under NRSWA and Roads (Scotland) Act 1984 have
been breached (see table below). In practice, these will generally be issued on the
Commissioner’s behalf by Compliance Officers.
Page 172 of 204

Page 173

2.15.1 The Scottish Road Works Commissioner has directed that Compliance Notices will
be issued to address both: 
• Systematic failings, i.e. those where a pattern of non-compliance is identified
and; 
• One-off failings of a suitably serious nature;
o Safety breaches where an identifiable danger exists to life and limb;
o High profile non-compliances where media or political interest exists. 
2.15.2 Failure to comply with a Compliance Notice is an offence under the Act, which can
be subject to various financial penalties: 
• Upon summary conviction, a fine of up to £50,000 
• Upon conviction, an unlimited fine, 
• A Fixed Penalty Notice (it is anticipated that this will be the preferred means of
dealing with failures). 
2.16 Road works on local roads within North Lanarkshire have historically been managed in
line with the Safety at Street Works and Road Works Code of Practice, ensuring the
Page 173 of 204

Page 174

safety of the public and road workers.  The first provision (No.1) in the table above
presents an additional operational challenge to all Road Authorities to comply with the
full pedestrian segregation requirements within the Code of Practice, while retaining
access and accessibility for residents, particularly during road resurfacing and
improvement schemes. 
2.16.1 The signing and guarding of each site will continue to be determined during
the works planning phase through risk assessment, however full mandatory
compliance with the Code presents additional financial pressures on service
budgets. 
2.17 Further changes in relation to Fixed Penalty Notices are scheduled to be introduced
this year to allow the Commissioner to issue a wider range of FPN’s. 
The Council’s Role in Public Utility Works 
2.18 The Council endeavours to balance the needs of the utility companies, supporting them
to complete the works in the shortest practical time, against the overall needs of those
who live, work, visit and travel in the area. 
2.19 Statutory Inspections are a method by which a Roads Authority can regularly
establish the performance of utility companies It involves inspection of a random
sample of sites at various stages during the works and the guarantee period
following completion. 
2.20 There are three key stages of work for inspections and 10% of each utility’s works
are inspected at each stage: 
• Cat A - while it is being carried out (live sites); 
• Cat B - once a reinstatement is complete; and 
• Cat C - up to the end of their guarantee period. Prior to 1 October 2023, the
guarantee period lasted for a period of two years. This has now been increased
to six years for most reinstatement types. 
2.21 Typically, inspections of utility providers work will consider, but are not limited to,
the following: 
• Safe and proper traffic management used; 
• Ramps and correct information signs used; 
• Correct materials used; 
• Surface profile and condition; 
• Compaction of materials; 
• Sealing of joints, joints that have begun opening up; and
• All markings been replaced. 
Page 174 of 204

Page 175

2.22 Fees are payable to road works authorities for each sample inspection undertaken,
as prescribed by regulations. The current fee is set by the Scottish Government at
£36 per inspection. 
2.23 The number of sample inspections undertaken is based on the average number of
works by each utility during the previous three years. In 2023/24, the total number
of Sample Inspections carried out was 1,352. The breakdown of inspections on the
major utility company sites carried out is shown in Table 1. 
2.24 The average pass rate for sample inspections for all public utility reinstatements
was 97.0%. The Commissioner’s target pass rate for each utility is 90%.   
2.25 The extension of the guarantee period for public utility reinstatements to six years
will require changes to the Cat C inspection process going forward. 
Table 1 – Performance of Major Statutory Undertaker 
2.26 An additional process of defect inspections is carried out on reinstatements where
failures are found until remedial works are undertaken. This is supplemented by
additional target inspections on those utilities where performance is deemed not to
be acceptable. 
2.27 The Council issue Fixed Penalty Notices whenever there is a clear breach of
noticing requirements in line with the Code of Practice. Each Fixed Penalty Notice
is for £120, discounted to £80 if payment is made within 29 days. The objective of
the Fixed Penalty Notices is to improve the quality and timeliness of utility
companies notices, and ultimately the coordination of roadworks. 
2.28 The Service issued 236 FPN’s to utility companies during 2023/24. Table 2 provides
a breakdown of the organisations to whom the majority of the FPN’s were issued.   
2.29 While the Commissioner’s Report highlights that the performance of the Council is
satisfactory, the Service recognises the need for ongoing improvement in our
noticing practices, the quality of road reinstatements and in minimising
inconvenience during future works. 
2.30 Council officers will continue to coordinate all works requested by public utilities
and implement procedures to ensure conformity with the legislative changes
outlined above. Further training will be provided to ensure readiness. 
Page 175 of 204

Page 176

2.31 The majority of FPN’s issued at present are system generated. These FPN’s are
detected by the Scottish Road Works Register and issued by council officers where
the offences are substantiated. In line with the role out of the additional FPN’s
highlighted in 2.17 above, the Service will develop awareness and capability across
the Teams to increase compliance monitoring.     
2.32 Partnership working with all relevant stakeholders and utilising all available
innovation and technology to better coordinate road works and minimise disruption
on the network will continue. 
3. Measures of success 
3.1  The service continues to perform at or beyond the levels identified within the Office of
the Scottish Road Works Commissioners Report and adapts to the legislative changes
contained within the Transport (Scotland) Act 2019. 
4. Supporting documentation 
Appendix 1  Road Works Performance Review for North Lanarkshire Council –
2023/24
Appendix 2 Road Works Performance Review for North Lanarkshire Council –
2023/24 - Data 
Lyall Rennie
Chief Officer (Community Operations) 
1
1
1
1
2
2
8
13
21
30
33
46
63
Hutchison 3G
ESP Electricity
Nexfibre Networks Limited
Network Rail
Commsworld Limited
Vodafone Limited
Axione UK Limited
Virgin Media Group
SGN
Netomnia Limited
Scottish Water
SP Energy Networks
BT
Number of FPNs Issued by Public Utility
Page 176 of 204

Page 177

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 177 of 204

Page 178

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 178 of 204

Page 179

Appendix 1 
Page 179 of 204

Page 180

Page 180 of 204

Page 181

Appendix 2 
Page 181 of 204

Page 182

Page 182 of 204

Page 183

Page 183 of 204

Page 184

Page 184 of 204

Page 185

North Lanarkshire Council
Report
Environment & Climate Change Committee 
Does this report require to be approved? ☐ Yes ☒ No
Ref: PH/SB Date: 21/08/24 
Contract Award for Bridge Inspections 2024/25 
From  Pamela Humphries, Chief Officer (Place) 
E-mail barrst@northlan.gov.uk Telephone: Stewart Barr,
07958166657 
Executive Summary 
This report is to advise the Environment & Climate Change Committee of the decision taken in
accordance with condition 21.3.2 of the Council’s General Contract Standing Orders (GCSO’s)
where, out with the committee cycle, the Depute Chief Executive approved the award of a contract
for Bridge Inspections 2024/25 (the ‘Contract’) to AtkinsRealis Limited. 
The Contract was approved by the Depute Chief Executive on 27 June 2024 and was formally
awarded on 28 June 2024. The Contract is for a period of 9 months and commenced on 1 July 2024. 
The value of the Contract shall not exceed Seven Hundred and Forty Thousand, One Hundred and
Seventy-Four Pounds Sterling and Seventeen Pence (£740,174.17) exclusive of VAT. 
Recommendations 
It is recommended that the Environment and Climate Change Committee: 
(1) Acknowledge the award of the Contract to AtkinsRealis Limited at the value of Seven
Hundred and Forty Thousand, One Hundred and Seventy-Four Pounds Sterling and
Seventeen Pence (£740,174.17) exclusive of VAT. 
The Plan for North Lanarkshire 
Priority Improve North Lanarkshire's resource base
Ambition Statement (17) Ensure we keep our environment clean, safe, and attractive
Programme of Work Statutory / corporate / service requirement 
1. Background 
1.1 An annual contract is let to inspect the Council’s bridge stock and other road and path
structures. The 2023/24 contract expired on 31 March 2024. The Contract detailed within this
report facilitates the inspection of the scheduled structures for 2024/25.
Item 14
Page 185 of 204

Page 186

1.2 The Council has a statutory duty to carry out these inspections to ensure public safety and
fulfil our legal obligations. The Roads Scotland Act (1984) requires Local Authorities to have
a well-managed and maintained road network. Inspections and assessments are critical
activities for managing the road network and informing maintenance and replacement
regimes. 
1.3 The Council is required to appoint an appropriately experienced and qualified professional
consultant to carry out consultancy services in accordance with the specification, job
description and activity schedule included within the tender documentation. The consultant
is required to: 
• Provide suitably qualified staff, including sign offs of all principal Inspection reports by a
chartered Civil Engineer. 
• Provide appropriate temporary traffic management measures and suitable access
equipment/vehicle to enable the inspections. 
• Undertake principal inspections of 126 bridges. 
• Undertake general inspections of 167 bridges. 
• Undertake six level 1 scour assessments as per BD97/12. 
• Undertake six structural reviews as per CS451. 
• Undertake one structural assessment of half jointed structures as per CS466.
• Undertake general inspections of 30 park and core path bridges within Council
ownership.
• Produce and submit general and principal inspection reports, scour assessments and
structural reviews to the relevant standards detailed in the contract documents.
• Upload all the inspection information to the Council’s asset management software. 
1.4 The Scotland Excel Engineering and Technical Consultancy Framework 0820 has been
identified as the most appropriate route to market for this contract award procedure. Lot 1
Roads and Structure Services scope matches contract requirements. The underlying
consultancy contract will be NEC4 Professional Services Contract (June 2017) Option A
and will be managed by a Council Project Manager.   
2. Report 
2.1 A user intelligence group (the ‘UIG’) of technical and procurement representatives was
formed to review technical specifications, ways to maximise community benefits and
sustainability and to agree the procurement strategy that would deliver maximum benefit for
the Council via the Contract. 
2.2 The initial estimated value of the Contract dictated that the procurement procedure be
undertaken in accordance with the Public Contracts (Scotland) Regulations 2015. 
2.3 The procurement procedure was undertaken as a “Direct Award” from the Scotland Excel
framework agreement for Lot 1 Roads & Structures Services. The Scotland Excel
Engineering and Technical Consultancy Framework 0820 has been identified as the most
appropriate route to market for this contract award procedure. Lot 1 Roads and Structure
Services scope matches the Contract requirements. 
2.4 AtkinsRealis was selected to provide a tender in accordance with the direct award call-off
procedure “7.4 Selecting a Supplier (call off procedure)”. This clause states that a supplier
can be selected to carry out a work order from a selection of 10 different criteria of which one
needs to be satisfied. In this instance the applicable criteria being the combined tenderers
Technical and Commercial Scores were used. 
2.5 The tender submitted by AtkinsRealis Ltd has been evaluated as representing the most
economically advantageous tender for this Contract. 
Page 186 of 204

Page 187

2.6 Further details of the procurement procedure is provided in Appendix 1 and the SME status
and location of the tenderer is located within Appendix 2. 
Price Savings / Increases 
2.7 The pre-tender whole life estimate for the Contract was One Million Pounds (£1,000,000). An
estimate for the original scope was received and valued at approximately £1.4M.  A rescoping
exercise was subsequently undertaken, with the removed from scope services rescheduled
to be delivered across future years. Following the revision of the scope and completion of the
procurement procedure, the value of the Contract is Seven Hundred and Forty Thousand,
One Hundred and Seventy-Four Pounds Sterling and Seventeen Pence (£740,174.17)
exclusive of VAT. 
2.8 The revised scope removed the following anticipated services:  
• Five structures for structural assessment of half joints as per CS466
• The inspection of 50 park and path bridges and structures. 
2.9 The consultant submitted a detailed breakdown of the activity schedule, including rates for
all categories of employees, and sub-contractor costs. This was reviewed by the Tender
Evaluation Team and shown to offer best value and were in line with framework rates. 
2.10 The costs associated with contract delivery will be contained within the capital budget for
Infrastructure & Transportation, Bridge Engineering. 
Price Stability 
2.11 The payment mechanism is an NEC4 Professional Services Fixed Price Activity Schedule.
Any out-of-scope variations will be treated as a compensation event. 
Community Benefits 
2.12 The procurement included a community benefit requirement, this approach is designed to
deliver local community benefits where possible. 
2.13 AtkinsRealis Limited committed to deliver awarding a minimum of four number sub-contracts
for supplies, services or works to local SMEs. 
2.14 The community benefits delivered as part of the Agreement does not include the creation of
jobs or apprenticeships. 
Fair Work First  
2.15 Within their tender submission, AtkinsRealis Limited advised that they commit to the key
areas of the Scottish Government’s “Fair Work First” initiative. 
Contract Management 
2.16 Officers from Bridge Engineering, Infrastructure & Transportation will be responsible for
managing the Agreement which will be undertaken in accordance with NEC4 Professional
Services contract conditions. 
3. Measures of success 
3.1 The Contract will deliver the following outcomes:
Page 187 of 204

Page 188

• Identification of asset condition and safety concerns for 323 bridges, allowing action to
be taken such as remedial action or closures.
• Conformation of load capacity of one bridge.
• Provision of data required to support effective management, maintenance, renewal and
financial planning.
• Assist in delivery of a well-managed and maintained road network. 
• Compliance with relevant legislation. 
4. Supporting documents 
Appendix 1 Summary of Procurement Process 
Appendix 2 SME Status and Location of All Tenderers 
Pamela Humphries 
Chief Officer (Place) 
Page 188 of 204

Page 189

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
There is sufficient budget provision within Bridge Engineering, (Infrastructure &
Transportation).
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data? 
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-mailed
to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Page 189 of 204

Page 190

Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts, highlighting
where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk
Registers), and how they are managed?
The contract outcomes are control measures within Corporate Risk Register Reference
RIS0000497 - Bridges and Retaining Structures Asset Conditions.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does
it relate to healthcare, housing, or education services for in-Service or ex-Service
personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to ensure
there has been appropriate consideration of the particular needs of the Armed Forces
community to make sure that they do not face disadvantage compared to other citizens in
the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service delivery,
policy, or plan that has an impact on children and young people up to the age of 18, or on
a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles from the
United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been carried
out? 
Yes ☐ No ☐  
Page 190 of 204

Page 191

Appendix 1 – Summary of Procurement Process
CPT Contract Reference Allocated: NLC-CPT-23-137
Procurement Procedure Utilised: Direct Award from Framework Agreement
Governing Legislation / Regulations: Public Contracts (Scotland) Regulations 2015
Date Contract Strategy Approved: 30 April 2024
Framework Owner: Scotland Excel
Framework Title: Engineering and Technical Consultancy
Framework
Framework Reference Number: 0820
Lot Reference / Title: Lot 1 – Roads & Structures 
Companies Appointed to Framework / Lot:
AECOM Limited 
Amey OW Limited
AtkinsRealis UK Limited
Gavin & Doherty Geosolutions (UK) Limited
Haskoningdhv UK Limited
Ironside Farrar Limited
Jacobs UK Limited
Local Transport Projects Limited
Mott MacDonald Limited
RPS Consulting Services Limited
RSK Environment Limited
Stantec UK Limited
Sweco UK Limited
WSP UK Limited
Date ITT Published: 12 June 2024
Tender Platform Utilised: PCS Quick Quote (PCSQQ)
Tender Return Deadline: 17 June 2024
Number of Tenders Received: 1
Tenders from SME’s: 0
Tenders from NLC Based Tenderers:  0
Tenders from Supported Businesses: 0
Number of Recommended Tenderers: 1
Assessment Team: Bridge Engineering Team (Infrastructure and
Transportation)
Anticipated Start Date of the Agreement: 01 July 2024
Total Agreement Period (Months): 9 Page 191 of 204

Page 192

Awarded Value of the Agreement: £740,174.17
Page 192 of 204

Page 193

Appendix 2 – SME Status and location of all Tenderers 
Name of Tenderer
Size of Tendering
Organisation
(Micro, Small,
Medium or Large)
Location
(Local Authority /
Council Area)
AtkinsRealis Limited. Large Midlothian 
Page 193 of 204

Page 194

Page 194 of 204

Page 195

North Lanarkshire Council
Report
Environment & Climate Change Committee 
Does this report require to be approved? ☐ Yes ☒ No
Ref: NLC-CPT-23-017 Date: 21/08/24 
Contract Award for Provision of an Enterprise Asset Management
Solution (CONFIRM) 
From  Lyall Rennie, Chief Officer (Community Operations) 
E-mail renniely@northlan.gov.uk Telephone 07855 193500 
Executive Summary 
This report is to advise Committee of the decision taken in accordance with condition 21.3.2 of the
Councils General Contract Standing Orders (GCSO’s) where in the absence of committee, the
Depute Chief Executive approved the award of a contract for the Provision of an Enterprise Asset
Management Solution (CONFIRM) (the ‘Agreement’) on 22 February 2024 to Computacenter (UK)
Ltd. 
The Agreement was formally awarded on 27 February 2024 and is for an initial period of 96 months
backdated to 1 December 2023, the contract award has been back dated as the previous contract
expired 30 November 2023. The council reserves the right to extend the Agreement for additional
periods up to a maximum of a further 48 months. 
The maximum value of the Agreement is Six Million, Forty-Nine Thousand and Forty-Nine Pounds
Sterling (£6,049,049) exclusive of VAT. 
Recommendations 
It is recommended that the Environment and Climate Change Committee: 
(1) Acknowledges the award of the Agreement to Computacenter (UK) Ltd at a maximum value
of Six Million, Forty-Nine Thousand and Forty-Nine Pounds Sterling (£6,049,049) exclusive of
VAT over the entire proposed contract period. 
The Plan for North Lanarkshire 
Priority Improve North Lanarkshire's resource base
Ambition Statement (17) Ensure we keep our environment clean, safe, and attractive
Programme of Work Digital North Lanarkshire 
Item 15
Page 195 of 204

Page 196

1. Background 
1.1 Part of the requirements within the Agreement were under contract with Brightly (previously
known as initially Pitney Bowes and then Dude Solutions). This arrangement expired on 30
November 2023 with the Agreement detailed within this report due to supersede it. 
1.2 The CONFIRM asset management application has been used by Streetscene Services for
more than 20 years and is now embedded into operations across a number of services and
includes integration to North Lanarkshire Council’s Customer Relationship Management
(CRM) system. 
1.3 Over the last few years Housing & Property Services and Waste & Streetscene have utilised
a further Agreement on a limited basis for asset management purposes. In 2020, the Head
of Environmental Assets gave approval for all Roads and Infrastructures assets to be
transferred from the existing RMS platform onto CONFIRM, to generate efficiencies through
the Service’s Digital NL Sprint. 
1.4 NLC had two separate contracts covering multiple service areas which are being
consolidated to a single contract to minimise procurement and achieve future cost avoidance.
By operating with two contracts NLC have resources from multiple services operating the
same system separately. This procurement establishes a single long-term solution that
consolidates existing contracts while continuing to meet core business requirements for all
involved services while continuing to align to NLC’s enterprise architecture principles and
technical standards. 
1.5 In aligning to enterprise architecture, moving the CONFIRM system to a supplier hosted
solution (Cloud First) will minimise business disruption due to system upgrades and/or
software maintenance. By moving to a hosted solution, tasks and risks associated with
(software/hardware) upgrades and maintenance are transferred to the supplier with the aim
of reducing service impact. 
1.6 A detailed report including recommendations was submitted to a special Enterprise
Architecture Governance Group (EAGG) meeting on 14 December 2022. Approval was
provided to progress the use of the Scottish Government Software Value Added Reseller
(SVAR) Framework (SP-21-034) to source a long-term contract. This will cover the use of
Confirm (provided by Brightly) as an Enterprise Asset management solution across multiple
NLC service areas including Community Operations (Roads, Streetscene, Cemeteries)
Corporate Properties. A link to the report and the meeting minute showing approval is
provided below:
20221214 EAGG Briefing Paper - Enterprise Asset Management - Use of Confirm.docx
Special EAGG Minute 14 12 2022.docx 
1.7 The Activity Schedule issued with the Tender documents was developed to allow scope for
expansion and contraction of users throughout the life of the Contract. This will enable further
consolidation of software systems as other service areas undertake digital transformation
allowing a fluid and flexible licence agreement. 
1.8 The proposed licence profile has been offered at significantly commercially advantageous
rates due to both parties proposing to enter a long-term relationship. This offers North
Lanarkshire Council the opportunity of realising a minimum of £1.5m in cost avoidance
throughout the lifetime of the contract, based on the minimum commitment of 290 licences
required at the commencement of the Agreement. 
Page 196 of 204

Page 197

2. Report 
2.1 A group of technical and procurement representatives was formed to develop and agree the
procurement strategy for the Agreement to enable the council to achieve maximum benefit
for the requirements. 
2.2 The initial estimated value of the Agreement dictated that the procurement procedure be
undertaken in accordance with the Public Contracts (Scotland) Regulations 2015. 
2.3 The procurement procedure was undertaken as a “Direct Award” from the Scottish
Government’s Software Value Added Reseller (SVAR) framework agreement. Following the
justification detailed and appraised within the associated contract strategy document, the
Direct Award procedure was considered to demonstrate “Best Value” for the council. 
2.4 The key aim of the SVAR framework is to provide Scottish public sector and third sector
bodies (framework public bodies) with a one-stop access to a commercial arrangement for
the purchase of commercial off the shelf (COTS) software and support services.  There are
no lots and only a single supplier with one call-off method, direct award. 
SVAR Framework benefits include: 
• Reduction in duplication of procurement activity within the Scottish public sector. 
• Easy to use, single supplier framework, with no need to run a mini competition. 
• Standardised terms and conditions. 
• Structured discounts in place for software purchases that will deliver demonstrable
value for money and savings. 
• Centralised framework administration and management. 
• Asset recording of purchased software. 
• Aggregation of bulk software purchases (bringing together organisations with similar
purchases to identify savings). 
• Management and administration of price competitions between software options to
identify further savings. 
• Reduction in the amount of NLC (IT, Service and Procurement) staff resources
required from multiple services to support the procurement process.
• Provides transparency in the process of sourcing a contract with an existing supplier. 
2.5 The use of the SVAR framework allows NLC to make use of a 3rd party to engage with Brightly
Software in relation to the direct award of a long-term contract where the 3rd party provides
procurement support to complete required negotiations. 
2.6 The strategic objective aligns with the Plan for North Lanarkshire which sets out our vision
and plans to deliver a world class digital infrastructure capable of enhancing digital skills and
levels of participation within our communities. The planned digital transformation will ensure
intelligent use of data and information to support fully evidence-based decision making and
future planning. Rationalisation of line of business systems feeds directly into Digital NL
objectives. 
2.7 Other strategic/technical objectives include: 
• Deliver best value to the Council.
• Adhere to NLC’s enterprise architecture principles and technical standards.  Page 197 of 204

Page 198

• Enable business continuity and certainty of service provision.
• Establish beneficial contractual obligations for tight control of spend throughout the
agreed term in accordance with the Council’s General Contract Standing Orders
(GCSO).
• Further develop the relationship between Brightly (via Computacenter) and the
Council to deliver further efficiencies and best practice.
• Promote a positive arrangement to the Council and the appointed Supplier ensuring
effective communication, risk management & dispute resolution.
• Ensure the Council’s adherence to statutory regulations in respect of the services
being undertaken.
• Ensure appropriate insurance provisions are in place and maintained throughout the
contract term.
• Access to and appointment of Supplier(s) that meet all statutory obligations i.e.,
equalities, health, and safety etc.
• Promote the Council’s aspirations in relation to creating prosperity and achievement
of social justice by considering workforce matters as part of the procurement process. 
2.8 NLC has 2 separate procurement exercises underway to source high value contracts for: 
• Housing & Corporate Maintenance & Investment Services (8+2+2)
• Roads & Infrastructure Maintenance and Improvement Services (8+1+1+1+1) 
Both contracts have a term length of up to 12 years. These contracts are interlinked with
this system so the durations have been aligned. 
2.9 Asset management is a key activity related to both contracts and as such the Brightly
Software Confirm system is classed as a strategic NLC business system where the new
contract should aim to be on a similar term basis as both enterprise contracts. By doing this
NLC can: 
• Develop an NLC enterprise asset management system strategy & roadmap and
produce an asset transition/development backlog that is likely to take several years to
complete.
• Minimise longer term service disruption allowing the time required to develop the
processes and required activities for each new asset type added to the system. 
• Remove the demand on service and procurement staff to repeat this procurement
process at some point (halfway) through the proposed enterprise contract term. 
• Gain long term visibility of system maintenance and development costs.
• Complete integrations/system links with 3rd party enterprise contract suppliers knowing
that it will not need to be redone during the length of the enterprise contracts and
additional integrations will not required.
• By establishing long term commitment to the supplier, NLC will gain long term pricing
benefits. 
2.10 The new contract will include a roadmap for adding assets and rationalising line of business
systems over the first 3-4 years. Agreed standard costs for ad hoc changes will also form
part of a long-term contract to minimise future price changes. 
2.11 As approved at NLC’s Enterprise Architecture Group, the Brightly Software CONFIRM
system will be used as a strategic asset management solution with asset types across
multiple services targeted to be transitioned to the Brightly Software CONFIRM system as an
approach to standardise the management of assets across NLC. 
Collaboration activities during the lifetime of the project will include but not be limited to: 
• Work to develop a roadmap for multiple asset types to be transferred, initially during
the first 4 years of the contract term. Page 198 of 204

Page 199

• The completion of work to transfer Roads, Bridges and Structures assets to the system
(July 2024).
• The transfer of assets from the Epilog cemetery system. 
• Small financial benefit possible by discontinuing the use of the Epilog system. 
• Completion of an evaluation exercise to move Protective Services and Trading
Standards activities to be managed using Confirm.
• Possible financial benefit from discontinuing the use of Civica APP.
• Planning and implementation of corporate properties and related asset types to
Confirm.
• The introduction of the Brightly Software Predictor module for use in assisting service
teams to identify future capital investment required for the entire asset lifecycle.
• Completion of a review of specialist staff resources required to support the system as
a strategic asset management system.
• Completion of reviews of other asset management systems across NLC including IT,
Fleet, Leisure and Housing. 
2.12 The tender received from Computacenter (UK) Ltd) underwent appropriate appraisal to
ensure it was complete / compliant with the council’s requirements and demonstrated value
for money. 
2.13 Further details of the procurement procedure is provided in Appendix 1 and the SME status
and location of the tenderer is located within Appendix 2. 
Financial / Budget Consideration 
2.14 Following completion of the procurement procedure, the maximum value of the Agreement
to be awarded is Six Million, Forty Nine Thousand and Forty Nine Pounds Sterling
(£6,049,049) exclusive of VAT. 
2.15 Prices were requested based on a minimum / maximum level and also on 4 separate bands
between 290 and 550 user licenses. Price breaks are applied at agreed levels where the rate
per individual licence drops as usage increases. 
2.16 The costs associated with delivery of the Agreement will be contained within the Capital &
Revenue budgets for the duration of the Contract. The licence costs will be covered by
individual services revenue budgets. 
Price Stability 
2.17 The tenderer has committed to a long-term pricing model, holding rates from years 1-5, 6-8
and 9-12 as tendered. Therefore, there will be no further effect of inflation on this contract
and improves service budget planning. 
Community Benefits 
2.18 The framework includes delivery of community benefits based on specific call-off spend. 
2.19 The community benefits delivered as part of the Agreement does not include the creation of
jobs or apprenticeships. 
Fair Work First  
2.20 Within their tender submission, Computacenter (UK) Ltd advised that they will commit to the
Scottish Governments “Fair Work First” initiative. 
Contract Management
Page 199 of 204

Page 200

2.21 Officers from Community Operations will lead and be responsible for managing the
Agreement which will be undertaken in accordance with the councils agreed approach to
contract and supplier management. Officers from other services will be included as required. 
3. Measures of success 
3.1 The Agreement will deliver the following outcomes; 
• The appointment of a Service Provider who has the experience and capability to deliver
an innovative, high quality and responsive service.
• The procurement procedure is compliant with procurement legislation and internal
procedures.
• Best value is being delivered through commercially advantageous rates due to the long-
term collaborative approach developed.
• Enables intelligent use of data and information to support fully evidence-based decision
making and future planning, in line with The Plan for North Lanarkshire objectives.
• Drive government objectives towards Net Zero and a sustainable future and enabling
innovation and change to Business as Usual processes. 
• Reduction in the amount of NLC (IT, Service and Procurement) staff resources required
from multiple services to support the procurement process and multiple systems. 
4. Supporting documents 
Appendix 1     Summary of Procurement Process
Appendix 2    SME Status and Location of All Tenderers 
Lyall Rennie
Lyall Rennie
Chief Officer (Community Operations)
Page 200 of 204

Page 201

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Summary of financial impact contained within report. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data? 
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-mailed
to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
See EAGG minutes contained within body of report. 
Page 201 of 204

Page 202

Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☒ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Indirectly via the CONFIRM system itself. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts, highlighting
where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk
Registers), and how they are managed? 
These are included on a separate risk register. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does
it relate to healthcare, housing, or education services for in-Service or ex-Service
personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to ensure
there has been appropriate consideration of the particular needs of the Armed Forces
community to make sure that they do not face disadvantage compared to other citizens in
the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service delivery,
policy, or plan that has an impact on children and young people up to the age of 18, or on
a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles from the
United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been carried
out? 
Yes ☐ No ☒ 
Page 202 of 204

Page 203

Appendix 1 – Summary of Procurement Process
CPT Contract Reference Allocated: NLC-CPT-23-017
Procurement Procedure Utilised: Direct Award via Framework Agreement
Governing Legislation / Regulations: Public Contracts (Scotland) Regulations
2015
Date Contract Strategy Approved: 20 December 2023
Framework Owner: Scottish Government
Framework Title: Software Value Added Reseller Framework
Framework Reference Number: SP-21-034
Lot Reference / Title: 1 - SVAR
Companies Appointed to Framework / Lot: Computacenter (UK) Ltd
Date ITT Published: 01 December 2023
Tender Platform Utilised: Other
Tender Return Deadline: 20 December 2023
Number of Tenders Received: 1
Tenders from SME’s: 0
Tenders from NLC Based Tenderers:  0
Tenders from Supported Businesses: 0
Number of Recommended Tenderers: 1
Assessment Team: Tommy Docherty, Scott Walker
Anticipated Start Date of the Agreement: 01 December 2023
Total Agreement Period (Months): 144 (8 + 2 + 2)
Awarded Value of the Agreement: £6,049,049 (maximum value)
Page 203 of 204

Page 204

Appendix 2 – SME Status and location of all Tenderers 
Name of Tenderer
Size of Tendering
Organisation
(Micro, Small,
Medium or Large)
Location
(Local Authority /
Council Area)
Computacenter (UK) Ltd Large Hertfordshire 
Page 204 of 204