Page 1

14 August 2023 
Members of the 
Environment and Climate Change Committee
Chief Executive’s Office
Archie Aitken
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk 
Notice is given that a Meeting of the Environment and Climate Change Committee is to be held in the Council Chamber,
Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on Wednesday, 23 August 2023 at 14:00 PM which you are
requested to attend. 
The agenda of business is attached. 
Archie Aitken
Chief Officer (Legal & Democratic) 
Members : 
Clerk Name: Andrew Rose
Clerk Telephone: 07951 409714
Clerk Email: rosean@northlan.gov.uk
H Loughran, J McPhilemy, T Carragher, P Di Mascio, K Duffy, F Fotheringham, W Goldie, J Leckie, A Masterton, M
McBride, B McCulloch, M McCulloch, P McDade, F McKay, C McManus, L Mitchell, L Nolan, J Reddin, L Roarty, A Smith, A
Stubbs, A Thomas, C Williams, N Wilson, G Woods.
Page 1 of 366

Page 2

Page 2 of 366

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical Standards In Public
Life Etc. (Scotland) Act 2000   
Operational   
2 Burial Space Strategy and Cemeteries Creation/Extension
Submit report by the Chief Officer (Community Operations) presenting updated
information on burial space needs within North Lanarkshire, and actions proposed
to provide sufficient new burial space on a community basis, together with details
on estimated costs and likely future increases (copy herewith) 
5 - 12 
3 Sustainable Futures - Country Parks for the Future
Submit report by the Chief Officer (Community Operations) (1) presenting the
proposed forward work plan for continued delivery of Country Parks for the Future
projects over the next two year period, and (2) advising that Country Parks for the
Future delivers much needed upgrades to the County Park infrastructure (copy
herewith) 
13 - 22 
4 North Lanarkshire Council Air Quality Action Plan 2023-2028
Submit report by the Chief Officer (Community Operations) seeking approval for
the Council’s updated Air Quality Action Plan for the period 2023-2028 which is a
statutory requirement under the Local Air Quality Management Framework (copy
herewith) 
23 - 194 
5 Cemeteries Management Update
Submit report by the Chief Officer (Community Operations) (1) providing an update
on changes to memorial management to improve health and safety across the
authority, and (2) outlining proposed improvements to cemetery infrastructure,
management and operations (copy herewith) 
195 - 206 
6 Mission Zero for Transport
Submit report by the Chief Officer (Community Operations) outlining how the
Council will move its own fleet to zero emissions but also act as a facilitator to
allow its residents and businesses across the Council area to make a similar shift
and deliver on the local and national net zero ambition (copy herewith) 
207 - 220 
7 Business Regulation Service Plan 2023-2024
Submit report by the Chief Officer (Community Operations) seeking approval for
the Service Plan for the Council’s Business Regulation Service which fulfils the
Council’s obligations relevant to food and health and safety law (copy herewith) 
221 - 264 
8 Seven Lochs Heritage Project and Partnership
Submit report by the Chief Officer (Community Operations) (1) explaining that the
Council has provided capital funding for improvements and benefitted from
National Lottery Heritage funding at a match of around 63% for these projects,
with this lottery funding due to end in December; (3) summarising delivery
outcomes from the lottery funding in North Lanarkshire, and (3) presenting the
collaboration agreement proposed to sustain the partnership to both protect the
lottery investment and to look for further funding streams to continue
improvements (copy herewith) 
265 - 292 
9 Winter Service Policy and Procedures 2023/24
Submit report by the Chief Officer (Community Operations) (1) presenting details
of the proposed Winter Service Policy and Procedures for 2023/24; (2) advising
that the Council has an obligation to take such steps as it considers reasonable to
prevent snow and ice endangering safe passage of pedestrians and vehicles over
public roads, and (3) explaining that to ensure that these obligations are met, the
Council is required to annually review its processes and procedures and approve
an annual refresh of its policy (copy herewith) 
293 - 318   
Page 3 of 366

Page 4

10 Sustainable Futures - Local Heat and Energy Efficiency Strategy
Submit joint report by the Chief Officer (Housing Management ) and the  Chief
Officer (Assets and Procurement) advising of the progress made in producing a
Local Heat and Energy Efficiency Strategy for North Lanarkshire which will set out
the long-term plan for decarbonising heat in buildings and improving their energy
efficiency across the entire local authority area (copy herewith)
319 - 328 
11  Annual Report on the Performance of North Lanarkshire Council
from the Scottish Roadworks Commissioner and Transport
(Scotland) Act 2019 Update
Submit report by the Chief Officer (Community Operations) presenting details of
the Scottish Road Works Commissioner’s Performance Review in relation to Road
Works undertaken by North Lanarkshire Council during 2022/23 for which it has a
Duty under Section 118(1) of the New Roads and Street Works Act 1991, to co-
ordinate the execution of works of all kinds in roads for which it is responsible
(copy herewith) 
329 - 346  
Contracts   
12  Transforming Places: Contract Award for Live Labs 2 Professional
Services Support
Submit report by the Chief Officer (Community Operations) seeking approval to
approve the award of a contract for Live Labs 2 Professional Services Support
which supports a key project within the Council’s Sustainable Futures Programme
of Work (copy herewith) 
347 - 358 
13  Contracts Awarded Below Committee Approval Threshold
Submit report by the Chief Officer (Assets and Procurement) providing notification
of the contracts awarded between 1 April 2023 to 30 June 2023 with a value below
the financial threshold requiring Committee approval (copy herewith) 
359 - 366 
Page 4 of 366

Page 5

North Lanarkshire Council
Report
Environment and Climate Change Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    AMcP/VA/CM Date 23/08/23 
Burial Space Strategy and Cemeteries Creation/Extension 
From  Chief Officer (Community Operations)  
E-mail McPhersona@northlan.gov.uk Telephone 07939 280467 
Executive Summary 
This report presents committee with updated information on burial space needs within
North Lanarkshire, and actions proposed to provide sufficient new burial space on a
community basis. 
The Burial Space Strategy monitors annual changes in lair capacity at each cemetery and
lair sales projections allowing the council to plan ahead with the aim of providing sufficient
space before capacity runs out as close to our communities as possible. 
The original 2020-2025 cemeteries capital program contained three major projects. 
• Wishaw Area - Pather Farm New Cemetery Creation – Replaces Cambusnethan
Cemetery which cannot be extended and has a run out date of September 2026 
• Coatbridge Area - Coltswood Cemetery Extension – Run out date June 2026 
• Airdrie Area - New Monklands Cemetery Extension.  – Run out date July 2031 
Current cost estimates show these cannot all be delivered in full within the existing capital
allocation. Pather Farm Cemetery has been in design since 2017. Various factors,
including ground water levels and access restrictions have impacted on the project
resulting in several rounds of redesign work. The estimated costs have risen steeply, and
any further delays will likely lead to further increases. 
Recommendations
It is recommended that the Environment and Climate Change Committee: 
(1) Acknowledge the projected demand for burial space.
(2) Note the significant capital resource required to develop burial space and the restricted
availability of appropriate land.
(3) Agree the proposed approach for prioritising delivery of new lairs as resources allow.
(4) Approve, in advance of tender returns, awarding contract to construct the new cemetery
at Pather Farm (see section 2.10 of this report).  Following tender returns a full update will
be provided to committee.
Item 2
Page 5 of 366

Page 6

1. Background 
1.1 North Lanarkshire Council has a legal obligation to provide burial space. 
1.2 The agreed Burial Space Strategy outlines the most effective ways to do this with the
aim of:
• Providing sufficient burial space within a reasonable distance of each community to
enable bereaved families to visit graves regularly and without undue cost. 
• Prioritising utilising any appropriate existing space in active cemeteries and then
extending existing cemeteries as a cost efficient and functionally effective means
of providing sufficient burial space in each community. 
1.3 Annual monitoring of burial space uptake enables the council to project ahead to
estimate future burial space needs and plan delivery of sufficient space. This identifies
several cemeteries where space is running out. A previous report to the Environment
and Transportation committee in May 2019 highlighted action needs to be taken and
that committee: 
• Agreed to secure land for the extension of New Monkland and Coltswood Road
cemeteries.
• Approved the development of a new cemetery for Wishaw at Pather Farm. 
2. Report 
Overview 
2.1 Projects designed to address the identified needs were proposed in the last capital
program, with budgets based on historic costs from previous projects. Following site
investigations and design work this budget is insufficient to enable all three sites to be
constructed. A breakdown of cost estimates is given in Table 1. 
Table 1
Project Name Current Cost Estimate
Pather Farm including design costs £5,060,000 
Coltswood Extension- including design costs £2,747,350 
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (17) Ensure we keep our environment clean, safe, and attractive
Page 6 of 366

Page 7

New Monklands Extension – including design costs £4,054,900
TOTAL £11,862,250
Current Capital Allocation £4,967,432 
Pather Farm New Cemetery Creation Project 
2.2 The proposed new cemetery at Pather Farm has been in development since 2017. It
will replace Cambusnethan when the main section of that cemetery becomes full
(projected Sept 2026) serving the community of Wishaw and surrounding areas.
Planning permission for the development has been secured subject to conditions,
including agreement with SEPA on proposed layout. Following a series of required
redesigns, vehicular access will now be through Pather Village and the majority of the
lairs on offer will be single. Single lairs are not the preferred option for council or
communities but may be the only way of adapting to the higher than expected water
table on this site. The projected costs of phase 1 of the project are currently in the
region of £5 million and this cost will be confirmed when tender prices are returned
October 2023. Works are projected to start on site in early 2024 and conclude the same
year.  This would enable the construction phase to finish six months before space in
Cambusnethan is projected to run out..  A phase 2 can be delivered to the south east
of phase 1 and would deliver a further 10 year capacity, development costs will be
significantly lower for phase 2 as all the major infrastructure will be delivered through
phase 1.   
Coltswood Cemetery Extension 
2.3 Coltswood Cemetery is projected to run out of burial space in June 2026. The extension
of the site into land at Morven Street is currently in design. Site investigations have
highlighted issues with made up ground and contamination which require further
investigation to assess the viability of the project. Estimated costs for the whole project
are currently £2.7million. The proposed phase 1 costs are estimated at £1m. Delivery
could start late 2024, depending on ground condition viability and budget availability. 
2.4 To reduce the risk of burial space running out for this community, while the external
extension is still being assessed for viability, the cemeteries team are investigating
interim additional burial space through changes to the soft landscaping design of the
existing cemetery. This could provide significant additional lair space.  The mature trees
surrounding the cemetery will be retained but this will involve the removal of some
existing shrubs and semi mature trees and may involve removing ad hoc
memorialisation that has been placed in the trees.  This will be done as sensitively as
possible, but as these are not lairs there are no records of the memorialisation.  Social
media channels, community boards and on-site notices will all be used to raise
awareness of changes. 
New Monklands Cemetery Extension 
2.5 New Monklands Cemetery is projected to run out of burial space in July 2031. The
extension of the site into nearby farmland acquired by the council is in the early stages
of design and ground investigation. The estimated costs for the whole project are £4
million and the proposed phase 1 costs £0.74m.
Page 7 of 366

Page 8

Bedlay Cemetery Extension 
2.6 Bedlay Cemetery is currently closed to new burials. A potential extension site has been
identified and provisional planning permission granted however the site is not owned
by the council and further progress requires the conclusion of a Section 75 agreement
linked to the development of neighbouring land. Progress on this is currently stalled
with no active negotiations in place with house builders. Planning permission for the
potential extension was renewed in June 2023 so the council is in a position to progress
with plans at such time as the development progresses provided resource is available
in the capital programme..   
Cambusnethan Faith Section 
2.7 The Muslim and Faith section of Cambusnethan has capacity to continue to operate
until 2043 but will require investment from the capital program to continue with
installation of headstones foundations and paths. 
Bothwellhaugh Cemetery Extension 
2.8 Projected run out date for currently developed space in phase 1 of this cemetery is April
2027, however within phase 1 there are existing areas which can be delivered by
adding foundation strips for headstones. If capital resources allow this could extend run
out dates at this site to 2033. 
Eastfield Cemetery Replacement 
2.9 This site currently has a forecast run out date in 2029. Adjacent council land appears
highly unsuitable for extension due to geotechnical issues and an alternative new
cemetery for this community should be considered. The service will start to work with
property colleagues to identify possible sites. 
Proposed approach to prioritisation. 
2.10 The service has considered not only the revised run out dates for burial space but also
the anticipated risks associated with costs and timescales for delivery of projects to
address this identified need. Committee is asked to approve the following
recommended approach: 
• Continue to construction phase of Pather cemetery.  Tender returns for this
project are due to be returned mid September 2023 and would be awarded,
subject to affordability and a report to committee providing details of the award
once complete. 
• Continue with site investigations and design for Coltswood and New Monklands
cemetery extension projects as budget allows and seek to utilise all appropriate
space in existing cemetery footprints. 
2.11 As resources allow in the new capital programme the service will seek to:
• Finalise design and enter into construction of Coltswood and New Monklands
Cemetery external extensions. 
• Action internal extension plans for Cambusnethan Faith Section, and
Bothwellhaugh Cemetery.
• Investigate alternative sites to replace Eastfield cemetery.
Page 8 of 366

Page 9

• Design and construct Bedlay Cemetery if and when S75 concluded. 
3. Measures of success 
• Burial space available within reasonable reach of each community.
• Burial provision achieved in the most cost-effective manner possible.     
4. Supporting documentation 
Appendix 1:  Cemetery run out dates from Burial Space Strategy data – updated April
2023. 
Andrew McPherson
Chief Officer (Community Operations) 
Page 9 of 366

Page 10

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
In order to deliver the full program additional capital resources are required. Should
Pather tender costs exceed the estimate it will not be achievable within the current
capital programme 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Page 10 of 366

Page 11

Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
If the full program is not deliverable communities may need to travel further,
increasing funeral poverty.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 11 of 366

Page 12

Appendix 1 – Burial Space Strategy run out dates across cemeteries 
Cemetery Area served Runout Date of
Developed
Lairs (April
2023)
Runout Date of
Lairs being
Developed
During 2023/24
Potential
Additional Life
Span
Runout Date of
Developed
Lairs +
Potential lairs
Bedlay
Cemetery
Northern
Corridor
Closed at
present time for
new lairs
- Extension being
developed,
subject to
section 75
agreement with
developer,
currently
redirecting
burials to other
cemeteries
Approx 20
years capacity,
once developed
Pather Farm
Cemetery
Wishaw and
surrounding
area
In development - Procurement
underway for
construction to
commence
winter 2023 and
completion
autumn 2024
Approx 5-7
years capacity
in Phase 1,
once developed
Coltswood
Road Cemetery
Coatbridge and
surrounding
area
Jun-2026 - Extension
possible
through
development of
fields to west
Feb-2036
Cambusnethan
Cemetery
Wishaw and
surrounding
area
Sep-2026 - None Sep-2026
Cambusnethan
Cemetery
Muslim Burial
Space
Southern area Mar-2027 - Further
development of
remaining
Muslim area
May-2043
Bothwellhaugh
Cemetery
Motherwell,
Bellshill and
surrounding
area
Apr-2027 May-2031 Phased
development
within cemetery
boundaries
Jun-2049
Eastfield
Cemetery
Cumbernauld
and
surrounding
area
Feb-2029 - Area to east,
requires
geotechnical
investigation
Jul-2062
Kilsyth
Cemetery
Kilsyth and
surrounding
area
Feb-2031 - Development of
lairs along
northern wall of
existing
cemetery.
Jan-2036
New Monkland
Cemetery
Airdrie and
surrounding
area
Jul-2031 - Area to north Jan-2053
Benhar
Cemetery
Shotts and
surrounding
area
May-2035 - Potential
extension into
council-owned
land to north
Aug-2086
Eastfield
Cemetery
Muslim Burial
Space
Northern area Jul-2116 - Potential to
include in wider
cemetery
extension
above
Jul-2116 
Page 12 of 366

Page 13

North Lanarkshire Council
Report
Environment and Climate Change Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    AM/VA/CM Date 23/08/23 
Sustainable Futures - Country Parks for the Future 
From Chief Officer (Community Operations)  
E-mail McPhersona@northlan.gov.uk  Telephone  07939 280467 
Executive Summary 
Considerable progress has now been made by a dedicated team driving forward the
program of work needed to achieve the council’s Country Parks for the Future ambition. 
In order to catalyse the health and wellbeing of our communities, a new gateway into
Strathclyde Country Park has been created for the community in Bellshill. This connecting
communities approach is now being extended to improve the entrance to Drumpellier
Country Park from Blair Road, centred around the green corridors promoted by the Seven
Lochs project. 
Plans which transform Palacerigg Country Park into a playful landscape for all ages have
been co-created with the communities in Cumbernauld. The proposals are based on a
series of themed areas and trails creating a high quality greenspace for local residents and
improving the economy by attracting regional tourists. 
Green spaces are key for mitigating and adapting to climate change. The Green Growth
Accelerator project at Strathclyde Country Park is awaiting confirmation of a £10million
pound grant enabling £15million investment in upgrading the existing watersports centre
into a low carbon wellbeing hub with improved outdoor education facilities and sporting
activities. 
Remembering Together, the Scotland wide fund to create Covid-19 memorials in each local
authority area, has been working with community groups across North Lanarkshire to
design a memorial which be the first major piece in an Art Trail at Strathclyde Country Park. 
Country Parks for the Future (CPFF) delivers much needed upgrades to our County Park
infrastructure, improving health and wellbeing, enhancing our environment, encouraging
economic regeneration through place making activity, and reducing our carbon footprint
The program is based on significant research and consultation but also remains agile,
adapting to capitalise on external funding and responding to changes in the needs of the
communities we serve. 
Recommendations
It is recommended that Committee
Item 3
Page 13 of 366

Page 14

1. Background 
1.1 The One Place – One Plan report approved at Policy and Strategy in March 2020
introduced the Country Parks for the Future programme. A 10 year delivery plan to
create a shift in the way communities use their parks and greenspace from passive,
leisure use to active, engaged community involvement; delivering improvements in
health, wellbeing, and social outcomes, as part of the council’s Programme of Work. It
aligns with both Sustainable Futures and Transforming Places. 
1.2 A dedicated Greenspace Projects Team manage the program and have been in place
since June 2021, delivering and developing plans alongside the community. 
1.3 A £5million capital program allocation towards the £100million estimated cost of
delivering the parks masterplans was allocated in 2020 and program delivery
demonstrates an over 50% leverage rate in attracting external investment to support
the council’s ambition.
1.4 The masterplanning process took place just before Covid-19 dramatically changed
communities lives and behaviours. The pandemic highlighted the importance of
greenspace for health and wellbeing and as a significant preventative health
resource. Our communities value and utilise greenspace more than ever and we see
increased interest from them in actively shaping a new future for our Country Park
resource.
1.5 A report to Environment and Transportation committee in February 2022 outlined the
designed proposals for a cycle gateway in Bellshill and this report updates committee
on delivery
1.6 A report to this committee in February 2023 outlined the proposals for a green growth
accelerator in Strathclyde Park and this report updates these proposals. 
2. Report 
2.1 Country Parks for the Future reimagines our public green spaces as health hubs for the
community; sites with high quality public facilities which meet modern needs, providing
effective environmental services and opportunities for education, active travel and
economic growth. By transforming these valued spaces we can create sustainable,
bright futures. 
1. Recognise the progress made so far in delivering Country Parks for the Future
and the contribution this makes to our programme of work ambitions, particularly
around Sustainable Futures and Transforming Places 
2. Endorse the proposed forward work plan for continued delivery of CPFF projects
over the next 2 year period.  
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement
(16) Transform our natural environment to support wellbeing and
inward investment and enhance it for current and future
generations
Page 14 of 366

Page 15

Active Parks 
2.2  The Bellshill Gateway to Strathclyde Country Park creates an appealing entrance into
the country park for three of the more deprived communities in the area, with open-air
wheeled sports facilities as the flagship attraction. These were highlighted by the
community as an area of interest when the 2019 Masterplan for Strathclyde Country
Park was created. The project has delivered a pump track, jump line, mountain bike
skills loop, mountain bike trails area (a first for a public park in Scotland) and a
mountain bike trails obstacle course. These facilities offer a top quality experience to
the community of North Lanarkshire.  In depth consultation, which took place to
design the gateway, led to several additions including two new ‘learn to ride’ areas in
the wider park and sports lighting at the pump track which extends usability in the
Scottish winter months. Complimentary features have also been delivered including 
• outdoor natural play
• biodiversity enhancements
• nature trail including an activity pack and an app for visually impaired visitors.
• a car park 
2.3  Improved walking and cycling routes connect the gateway right through to
Strathclyde Loch, and an active travel hublette was added to the design in order to
link with the Motherwell Station improvement program. The project was delivered in
collaboration with community organisations and local residents. External funding from
five different funders contributed over 50% of the £1.5million being invested through
the project. 
2.4 To stimulate use of the new facilities, a £60,000 activity program was organised
through funding from Smarter Choices Smarter Places. This provided cycle
engagement sessions at the learn to ride areas and pump-track. Over 1000 local
people have taken part in 70 different wheeled sports activity sessions and over 49
local volunteers, the council and NHS staff have also benefitted from training to
enable them to continue providing activities on site. Funding from Events Scotland
supported ‘Cycle Fest’ in May 2023, a community celebration at the Bellshill Gateway
providing activities across the wheeled sports facilities as well as walks and other
activities. 
2.5 In order to gauge the impact of the works the number of general visitors using the
facilities are recorded via a series of people/cycle counters. These show that from 22
November 2022 to 29 June 2023, 80,730 pedestrians, 49,971 cyclists, 6108 scooters
have used the Bellshill Gateway and associated park improvements. 
2.6  More detailed feedback from the community partner organisations delivering activities
at the Gateway tells us that participants at their sessions go from riding a bike with
stabilisers at the beginning to wheeling freely on their own at the end. Teens who turn
up with e-bikes are converting to pedal bikes and there is an uptake in helmet
wearing. Young adults with high levels of skill are helping others in their peer group to
pick up tricks and being encouraged to return to sessions as they have made friends. 
As a stamp of approval Scottish Cycling use the project as an example of best
practice and the UCI championships held one of their junior heats at the facility. The
project has been submitted for a COSLA Excellence Award under the category -
Tackling Inequality and Improving Health and Wellbeing.
Page 15 of 366

Page 16

2.7  Our communities get the most benefit from our greenspaces if they can access them
easily and enjoyably as shown through the Bellshill Gateway project. Improving the
quality of routes through greenspaces extends the number of different types of people
who can use them and adding lighting increases their usability as active travel routes
during darker winter afternoons/early evening. The Greenspace Projects team have
undertaken a series of other smaller improvements over the last two years based on
this principle.
2.8  £260,000 of improvements to the drainage and surfacing of over five miles of paths in
Palacerigg Country Park have been carried out. The routes chosen were selected
based on feedback from staff and stakeholders as well as a public survey in January
2023. To improve navigation around the path network, key visitor signage is also
being replaced and refreshed, starting at the key entrances, main car park and
around buildings but also stretching out to provide better navigation on all main
routes. A group of staff from different departments along with community stakeholder
organisations involved in Palacerigg Country Park are working on designs and
£47,000 of new signage will be in place this autumn. 
“Now that the work on Palacerigg and surrounding area paths is fully complete, I
wanted to write to you on behalf of all of us at Palacerigg parkrun, to thank you and
the team for all your support in making this happen. I know the original plans did not
include all of of the parkrun route, and that your team worked to get alternative
funding in order for us to have the entire route upgraded, the result is amazing. We
have seen our participant numbers double to mid 90's since we relaunched after the
improvements and the feedback has been nothing but positive. The quality of the path
network now makes it so much more accessible to many more people who want to run,
walk, jog, or even push a buggy to take part in parkrun. It also means many more
people are enjoying everything that Palacerigg has to offer.”  Parkrun volunteer
organiser.
2.9  Navigation is an important part of encouraging more recreational and active travel
access, and at Strathclyde Country Park a new, interactive map has been developed
with the community. Funded through Smarter Choices Smarter Places, the project
has collected favourite routes and information on points of interest and used these to
create an engaging, online map which will encourage people to try new running
routes or cut through the park on their way to work. 
2.10  Building on this success of the new Bellshill Gateway at Strathclyde Country Park the
entrance to Drumpellier Country Park from Blair Road is being enhanced,
encouraging visitors to walk through the park to reach the Visitor Centre and Crannog
play area rather than travelling by car. The existing informal parking is being
transformed into a formal car park, with appropriate Blue Badges spaces and
surrounding tree and wildflower planting. The next steps are to develop a nature trail
connecting Blair Road to the Lochside. 
Creative Parks
2.11 Our communities have many different interests and through the Masterplans we aim
to provide a broad range of opportunities so that as many different types of people
engage with parks and gain the wellbeing benefits this brings. The ‘Creative Country
Parks’ approach crafts parks where culture complements sport and recreation, where
Page 16 of 366

Page 17

the natural environment is enhanced by creative arts, and where visitors are inspired
and engaged. This vision is an integral part of the Country Parks for the Future
programme and provides the opportunity to contribute directly across a wide range of
council priorities from economic development and education to community
empowerment. 
2.12 An Art Park Advisory Group has been formed from key officers across relevant
council departments, and two community artists in residences for 2023/24
established. A range of projects are in development with external funding applications
underway to support delivery, and a highlight is the Remembering Together North
Lanarkshire project.
2.13  The Environment and Climate change committee received a report on the
Remembering Together project, creating a Covid-19 memorial for North Lanarkshire
in February 2023. Since then, feedback from the public consultation has enabled a
concept design to be finalised.
2.14  Participants had reflected that the pandemic made them appreciate outdoor spaces
for recreation but that they missed social contact during this period. They suggested
that the memorial could offer a place for people to meet and Remember Together as
well as for community designed art panels to be displayed. Wider public feedback
highlighted seating should accommodate all ages and abilities and to take into
account the needs of those suffering from long-covid.
2.15 The public survey gave a clear steer on location and soft landscaping preferences
and determined that the art panels should be made from materials which reflect
Lanarkshire’s manufacturing heritage. A lectern at the entrance will have information
about the pandemic, the process of creating the memorial, and direct visitors to the
Remembering Together website where more information is available. The memorial
space itself will not contain any words. 
2.16  The detailed technical design will be produced this summer, tendered in the autumn
and delivered spring 2024. Particular consideration will be given to working with firms
based in North Lanarkshire or who’s business has a positive impact on the area. The
public will be offered the opportunity to be involved in creating the soft landscaping
elements of the Remembering Together memorial through tree planting, blub planting
and wildflower seed sowing activities.
2.17 The Remembering Together Memorial will become a living space which our
communities can continue to benefit from as we move forward out of the pandemic.
Encouraging them to continue leading healthy active lives and building stronger,
caring communities. 
Sustainable Parks 
2.18  The Mega Flora project is a interdepartmetal approach to naturalising and enhancing
grassland management. The project will create diverse and healthy greenspaces for
local people to enjoy that reduce biodiversity loss, provide ecosystem services, and
help combat the climate emergency.
2.19 The Greenspace Scotland “levelling-up parks” fund has provided £35k for research
into naturalising grassland, developing a detailed plan for different wildflower
establishment techniques which are tailored to each land parcel, increasing the
Page 17 of 366

Page 18

success rate of meadow establishment. Information will be provided at each location,
with a link to a website where more information can be found. Through engaging with
local communities to discuss the trial sites near them, we hope to change perceptions
and increase awareness.
2.20  Community Operations have been investigating green energy solutions linked to
parks for several years through a Scotland wide Park Power research project led by
Greenspace Scotland. Strathclyde Country Park (SCP) was identified by independent
consultants as a site with very high potential. The need to modernise the Watersports
Centre and provide updated public services, including space for delivery of the
Outdoor Education program, was scoped during the Masterplanning process and
approved by committee in 2020. A report to this committee in February 2023 outlined
the bid submitted to Scottish government. We have not yet received a funding
decision from the Scottish government which has pushed the project timelines back 6
months with potential completion in 2027. 
Playful Landscapes  
2.21  The Palacerigg Country Park Masterplan was developed in consultation with the local
population of Cumbernauld through drop-in events and an online questionnaire. Over
1,500 people engaged in the consultation including over 300 at face-to-face events and
1,200 online responses.  
This consultation process identified Play, Access and Community as key areas in need
of improvement. The community want a place full of special and authentic experiences
hosting a wide range of activity, and the masterplan recommends developing a strong,
distinctive brand identity with ‘best-in-class’ attractions at a regional/Scottish level
capable of providing a driver for visitor footfall and repeat visits. 
2.22 The Masterplan recommends combining natural play in traditional settings with a range
of adventurous and exploratory experiences across the natural landscape of the park.
The service commissioned a co-design process in 2022 and 2023 which focussed on
creating a plan for a playful landscape for everyone at Palacerigg Country Park. The
design process included 27 workshops with stakeholder groups, conducted 26 face to
face surveys in Cumbernauld Town Centre, ran 3 co-design workshops in the park with
105 people and also surveyed over 300 members of the wider population through a
digital questionnaire. 
2.23 All of this information, plus surveys of the park, was used to design a playful landscape
made up of complementary but thematically distinct interventions. There is now a fully
costed plan outlining how to deliver of all the aspects of the design. Attracting sufficient
funding and delivering this vision would create new infrastructure, improving the social
and physical environment in the park and creating a regional/national level Country
Park attraction, bringing in more tourists and providing a valuable resource for residents
of Cumbernauld across all age groups. 
2.24 The visitor centre is subject to an active Community Asset Transfer request by
Palacerigg Community Trust (PCT) which aims to provide affordable, inclusive
services for the community based in the former visitor centre. If the transfer is
successfully concluded in the near future the service intends to work with the trust in
seeking external funding streams  for insulation, efficiency improvements, and
renewable energy generation. 
Page 18 of 366

Page 19

2.25 In addition to proposed car parking improvements at Palacerigg, access to the site via
Active Travel would also benefit from be improved through links to the Community
Growth Areas which are being developed to the North and West of the park, and
through them to the Town Centre and the Pan orbital expressway over the next 7
years. The feasibility of this will be examined as a cross departmental area of focus. 
2.26 Combining activity, sustainability and creativity the Playful Landscape Plan for
Palacerigg will act as the catalyst to regenerating the whole park. In order to deliver
these ambitious plans investment of £4 million is required and currently funding bids to
RCGF and NHLF and CARES are being prepared. 
Next Steps Timeline 
2.27
Project 23/24 24/25 25/26 26/27 27/28 28/29
Blair Road Gateway      
Remembering Together      
Mega Flora      
Art Parks*      
Green Growth Accelerator*      
Playful Landscapes*      
(*indicates projects subject to funding being secured) 
3. Measures of success 
3.1  Completion of priority projects listed within the approved Masterplans, utilising available
external funding to boost capital allocation for CPFF.
3.2 Engagement with communities relevant to each project to ensure their feedback is
incorporated at a design stage and they are actively engaged in making best use of
delivered projects.
3.3 Cross departmental working which genuinely transforms places for our communities,
linking up the different services they receive from the council.   
Andrew McPherson
Chief Officer (Community Operations)  
Page 19 of 366

Page 20

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
Projects detailed will only be fully deliverable if budget is secured. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Page 20 of 366

Page 21

Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Several projects detailed will have a positive impact on the carbon footprint of
council operations
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The projects provide positive opportunities for communicating progress in
achieving our POW with communities in North Lanarkshire
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 21 of 366

Page 22

Page 22 of 366

Page 23

North Lanarkshire Council
Report
Environment and Climate Change Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref     Date 23/08/23 
North Lanarkshire Council Air Quality Action Plan 2023-2028 
From  Andrew McPherson, Chief Officer (Community Operations)  
E-mail mcphersona@northlan.gov.uk  Telephone    07939 280467 
Executive Summary
This report presents Elected Members with the Council’s updated Air Quality Action Plan
(AQAP) for the period 2023-2028. A statutory requirement under the Local Air Quality
Management (LAQM) framework where Air Quality Management Areas (AQMAs) have
been declared, the AQAP outlines measures the council pledge to take over the coming
years to improve air quality within the AQMAs and wider North Lanarkshire area. The
measures in the AQAP were prepared with input from internal and external stakeholders
and were subject to robust consultation in accordance with the relevant guidance. The
AQAP has been appraised by relevant and statutory consultees including the Scottish
Government and Scottish Environment Protection Agency (SEPA). 
Air pollution continues to be the biggest environmental threat to health in the UK, with
between 28,000 and 36,000 deaths a year being attributed to long-term exposure (UK
Committee on the Medical Effects of Air Pollutants). In 2018, Health Protection Scotland
estimated that approximately 1,700 attributable (premature) deaths in Scotland annually
can be attributed to air pollution. 
Once committee approval has been granted it will become a publicly available document
which demonstrates the Council’s commitment to improving air quality for the people of
North Lanarkshire. 
Recommendations
It is recommended that the Committee: 
• Consider the contents of this report and the accompanying appendices; and
• Approve the North Lanarkshire Council Air Quality Action Plan 2023-2028 
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (14) Ensure the highest standards of public protection
Item 4
Page 23 of 366

Page 24

1. Background 
1.1 Air pollution is associated with an ever-increasing range of adverse health impacts,
from cardiovascular and respiratory illnesses to more-recently links with incidence of
dementia. 
1.2 Local authorities in Scotland have a statutory duty to monitor and report on air quality
in their area under a framework known as Local Air Quality Management (LAQM).
National objectives and dates for compliance have been set for seven significant
pollutants. The main pollutants of concern in North Lanarkshire are Nitrogen Dioxide
(NO2) and Particulate Matter (PM10 and PM2.5). Road traffic emissions are a significant
source of these pollutants in North Lanarkshire. 
1.3 As a result of extensive air quality monitoring and investigation over several years,
pollution levels exceeding the national air quality objectives for PM10 were identified in
several areas of North Lanarkshire and these were consequently declared AQMAs.
Some of the AQMAs have since been revoked (the last revocation being for the Croy
AQMA, effective from 18/07/2022) however three AQMAs remain:-
• Motherwell Town Centre
• Whifflet/Shawhead/Kirkshaws (Coatbridge), 
• Chapelhall 
The declaration of AQMAs requires that an Air Quality Action Plan (AQAP) is prepared
and published. This latest AQAP follows on from the previous Plan which was approved
by the Infrastructure Committee on 21/11/2018. 
2. Report 
2.1 The AQAP 2023-28 has been produced as part of our statutory duties required by the
LAQM Framework. It outlines the actions the Council will take to improve air quality in
North Lanarkshire between 2023-2028 and encompasses input from across various
council services. 
2.2 Following the relevant air quality guidance (Policy Guidance document PG(23))
stakeholders from across several council services, elected members and relevant
external stakeholders attended two meetings to discuss and formulate the basis for the
preparation of the action plan measures. Subsequently the proposed action plan
measures were developed, and an online public consultation took place. Consideration
was then taken of the consultation responses and a list of action plan measures was
finalised and the Final Draft AQAP document written up. The final Draft AQAP was then
subject to further final consultation with statutory consultees including the Scottish
Government and SEPA and comments raised during this consultation were noted. 
2.3 From the overall list the key priorities that the Council pledge to focus on are as follows:
• We will investigate air quality around schools in North Lanarkshire with a focus
on drop-off and pick-up times.
• We will facilitate modal shift from private car use to active travel and public
transport.
• We will improve active travel options to North Lanarkshire Council hubs.
Page 24 of 366

Page 25

• As a council we will lead by example in taking measures to reduce air pollution
in North Lanarkshire, including decarbonisation of the Council’s vehicle fleet.
• We will undertake a comprehensive review of air quality monitoring to optimise
resources and coverage across North Lanarkshire.
• We will increase EV charging infrastructure across North Lanarkshire. 
2.4 The Glasgow Region City Deal includes several major projects aimed at increasing
regeneration and investment in the North Lanarkshire area through improving transport
links and infrastructure and redeveloping sites including:
• A8/M8 corridor access improvements;
• Glenboig link road; and
• Pan Lanarkshire orbital transport corridor.
These works are complemented by local long-term redevelopments and regeneration
projects which are progressing under the Plan for North Lanarkshire.  The development
control process for each of these will consider the potential effects on local air quality
and assessments will determine any impact on the relevant statutory objectives for air
quality. Any potential for cumulative impacts on air quality as development progresses
will also be considered in relation to these major infrastructure projects. Cognisance
will be taken of developments close to or impacting on the AQMAs. 
2.5 This updated Plan also forms part of the overall Environment Strategy for the Council
which will continue to be reported to elected members at relevant intervals. 
3. Measures of success 
3.1  Under the requirements of the Local Air Quality Management framework, progress with
the action plan measures will continue to be evaluated on an annual basis and reported
on in the statutory Annual Progress Report submitted to Scottish Government and
SEPA.   
4. Supporting documentation 
1. Appendix 1 Air Quality Action Plan 2023-2028
2. Appendix 2 Air Quality Annual Progress Report 2022 
Andrew McPherson
Chief Officer (Community Operations) 
Page 25 of 366

Page 26

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Each individual action plan measure contained within the document has financial
information included, as well as details on how each measure will be funded. There
is also access to apply for ring-fenced Scottish Government Air Quality Action plan
grant funding on an annual basis. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The production of the AQAP is a statutory requirement under the Environment Act
1995. Legal and Democratic Solutions have been involved in aspects of air quality
work such as the revocation of AQMAs 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐
Page 26 of 366

Page 27

If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Colleagues involved in carbon reduction measures in North Lanarkshire have been
involved in the preparation of this AQAP. One of the action plan measures is that
that the council will ensure air quality and climate change policy actions in North
Lanarkshire enjoy a relationship with co-benefits for both areas. 
The AQAP has also been subject to a strategic environmental assessment (SEA)
Screening Assessment, the Determination outcome being that no further SEA
assessment was necessary for the plan. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
In carrying out our statutory responsibilities a key element has been awareness-
raising on issues of air quality. To this end we liaise regularly with corporate
communications on awareness-raising campaigns e.g. Clean Air Day as well as in
communicating relevant consultations as part of the LAQM framework. Air quality
within North Lanarkshire is improving and it is important to make this known to
residents. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒
Page 27 of 366

Page 28

If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 28 of 366

Page 29

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028
OFFICIAL
OFFICIAL
OFFICIAL
OFFICIAL
North Lanarkshire Council
Air Quality Action Plan
In fulfilment of Part IV of the Environment Act 1995
Local Air Quality Management  
2023 - 2028 
Appendix 1
Page 29 of 366

Page 30

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028
OFFICIAL
OFFICIAL
OFFICIAL
OFFICIAL
Information North Lanarkshire Council
Local Authority Officer Fiona Maguire
Department Protective Services
Address Civic Centre, Windmillhill St, Motherwell,
ML1 1AB
Telephone 01236 856300
E-mail maguiref@northlan.gov.uk
Report Reference Number NLC AQAP
Date July 2023
Page 30 of 366

Page 31

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028
OFFICIAL
OFFICIAL
OFFICIAL
OFFICIAL
Document control
Title North Lanarkshire Council Air Quality Action Plan 2023-2028
Owner Andrew McPherson Contact mcphersona@northlan.gov.uk
Governance Group Environment and Climate Change Committee
Author Fiona Maguire Contact maguiref@northlan.gov.uk
Revision History
Number Originator Date Review Commenced Revision description/record of change
No revisions as yet –
new document
Document Approvals
Number Governance
Group
Date approval granted Date approval to be requested
(if document still draft)
1 Environment and
Climate Change
Committee
23rd August 2023
Consultation Record (for most recent update)
Status of document consulted upon Final Draft Air Quality Action Plan 2023-2028
Stakeholders consulted/date Stakeholder meetings, steering group and public consultation undertaken
during 2022-2023. 
Stakeholders consulted included relevant services North Lanarkshire
Council, elected members, statutory consultees including Scottish
Government, SEPA, neighbouring local authorities, Transport Scotland, SPT.
Full details of consultation in Sections 1.8, 1.9 and Appendix A 
Strategic Alignment
The Plan for North Lanarkshire
Climate Plan – Action on Climate Together 2030
Local Transport Strategy
Environment Plan
Local Development Plan
Biodiversity Action Plan 2023-2027
Priority – Improve the health and wellbeing of our communities.
Ambition Statement – (14) Ensure the highest standards of public protection.
Next review date
Review Date 2028
Page 31 of 366

Page 32

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028
OFFICIAL
OFFICIAL
OFFICIAL
OFFICIAL
Executive Summary
This Air Quality Action Plan (AQAP) has been produced as part of our statutory duties
required by the Local Air Quality Management framework. It outlines the action we will
take to improve air quality in North Lanarkshire Council between 2023-2028.
This action plan replaces the previous action plan which ran from 2018-2021. Projects
delivered through the past action plan include: 
• Revocation of Croy Air Quality Management Area (AQMA).
• Continuous Improvements to the North Lanarkshire Council vehicle fleet with
over 50% of vehicles fitted with tracking devices to monitor and provide
information on idling, speeding and unnecessary journeys.
• Driver Certificate of Professional Competence training has been provided for all
Council drivers, including modules on safe and efficient driving.
• Extensive provision of pool cars for use for Council business, including electric
and hybrid vehicles.
• Expansion of electric vehicle charging points, some of which are available for
public use.
• Continuation of the Eco Stars Fleet Recognition exceeding a total of 200
members.
• Car parking enforcement in town centres in North Lanarkshire to deter
inappropriate parking and to encourage the use of public transport and active
travel where available.
• Ongoing promotion of sustainable travel methods, particularly walking and
cycling for both leisure and commute. This included funding from the Scottish
Government air quality budget being provided for footpath shared use works
and signage in Motherwell Town Centre linking into wider active travel
improvements in the area.
• Establishing a monitoring network for PM2.5 in line with statutory requirements.
Page 32 of 366

Page 33

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 i
OFFICIAL
OFFICIAL
OFFICIAL
OFFICIAL
• The ongoing programme of upgrading our automatic air monitoring units and
ensuring they are sited in the most appropriate locations. Over the past few
years a new automatic monitoring site has been set up at Ravenscraig and sites
at Sunnyside Rd and Calder St (both Coatbridge) decommissioned and
relocated to more appropriate sites. 
• Development of a regional Air Quality dispersion model to include the most
populated centres and areas of growth within North Lanarkshire Council,
enabling the Council to target areas for monitoring, consider cumulative effects
of developments and plan and prioritise areas for future actions.
• Motherwell Town Centre Transport Interchange and redevelopment of
Motherwell Train Station and new road infrastructure behind Muir Street are now
complete and should lead to improved air quality in this area of Motherwell Town
Centre by reducing traffic congestion and making public transport a more
attractive and accessible  alternative to the car. 
• Contributions to improving cycling infrastructure in Strathclyde Park has also
been carried out, and several ebikes purchased which are due to be added to
the park’s bike hire fleet. 
• Significant awareness-raising of air quality issues among the public, including
the promotion of the “A Breath of Fresh Air in Lanarkshire” walking and Cycling
map and APP for Strathclyde Park in conjunction with South Lanarkshire
Council. This APP received a refresh and was launched on Clean Air Day in
2021. The North Lanarkshire Council website was also upgraded in 2021 and
all pages relating to air pollution were updated.
Air pollution is associated with several adverse health impacts. It is recognised as a
contributing factor in the onset of heart disease and cancer. Additionally, air pollution
particularly affects the most vulnerable in society - children and older people, and those
Page 33 of 366

Page 34

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 ii
OFFICIAL
OFFICIAL
OFFICIAL
OFFICIAL
with heart and lung conditions. There is also often a strong correlation with equalities
issues because areas with poor air quality are also often the less affluent areas1,2.
North Lanarkshire Council is committed to reducing the exposure of people in North
Lanarkshire to poor air quality to improve health.
There has been three consecutive years of compliance with the relevant air quality
objectives (AQOs), however, transport numbers were dramatically affected by the
lockdown-restrictions of the Covid-19 pandemic in 2020 and rose again in 2021 and
2022.  As we are still in a post-pandemic recovery phase, it is our duty to maintain the
AQAP until we have collected the required evidence to ensure that there is no
likelihood of exceedance of any of the AQOs at sensitive receptor locations across the
Council area.
We have developed actions that can be considered under seven broad topics:
• Alternatives to private vehicle use
• Promoting Travel Alternatives
• Promoting low emission transport
• Vehicle fleet efficiency
• Policy guidance and development control
• Public information
• Transport planning and infrastructure
Our priorities are: 
• Priority 1 – we will investigate air quality around schools in North Lanarkshire
with a focus on drop-off and pick-up times.
• Priority 2 – we will facilitate modal shift from private car use to active travel
and public transport. 
1 Environmental equity, air quality, socioeconomic status and respiratory health, 2010
2 Air quality and social deprivation in the UK: an environmental inequalities analysis, 2006
Page 34 of 366

Page 35

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 iii
OFFICIAL
OFFICIAL
OFFICIAL
OFFICIAL
• Priority 3 – we will improve active travel options to NLC hubs.
• Priority 4 – as a council we will lead by example in taking measures to reduce
air pollution in North Lanarkshire, including decarbonisation of the Council’s
vehicle fleet.
• Priority 5 – we will undertake a comprehensive review of air quality monitoring
to optimise resources and coverage across North Lanarkshire.
• Priority 6 – We will increase EV infrastructure across North Lanarkshire.
In this AQAP we outline how we plan to effectively tackle air quality issues within our
control to meet statutory air quality objectives within the shortest possible time.
However we recognise that there are many air quality policy areas that are outside of
our influence, but for which we may have useful evidence, and so we will continue to
work with the Scottish Government and partner organisations on policies and issues
beyond North Lanarkshire Council’s direct influence.
In accordance with the requirements of PG (S) (23), North Lanarkshire Council expects
the Nitrogen Dioxide (NO2) element of the Chapelhall and Coatbridge AQMAs to be
revoked no later than 2024 with the remaining AQMAs revoked within the shortest
possible time. 
Responsibilities and Commitment
This AQAP was prepared by the Pollution Control Team of North Lanarkshire Council
with the support and agreement of the following officers and departments:
• Fiona Maguire, Senior Environmental Health Officer, Pollution Control
• Mark Findlay, Assistant Business Manager, Pollution Control
• Annie Danskin, ITP Energised
• Susan McDougall, Team Leader (Transport and Planning)
• Lorna Bowden, Planning and Place Manager
• Gordon Laing, Planning Manager (Strategy and Policy)
• Edward McLennaghan, Senior Planning Officer
• Lyndsay Noble, City Deal Manager
Page 35 of 366

Page 36

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 iv
OFFICIAL
OFFICIAL
OFFICIAL
OFFICIAL
• Lynda Stevenson, Climate Change Lead Officer
• Andrew McPherson, Chief Officer (Community Services)
• Hayley Andrew, Community Greenspace Manager
• Chris Gannon, Procurement Manager
• Michael Dolan, Education and Families Manager
• Allan Comrie, SPT
Following consultation with statutory and other relevant consultees including SEPA
and the Scottish Government, this AQAP will be approved by the North Lanarkshire
Council Environment and Climate Change Committee and thereafter ratified by Full
Council and submitted to the Defra via the Report and Submission Website (RSW).
This AQAP will be formally reviewed and republished on a five-yearly cycle from date
of initial publication. Progress each year will be reported in the Annual Progress Report
(APR) produced by North Lanarkshire Council, as part of our statutory Local Air Quality
Management duties. 
A local authority should allow 12 months for the formal action plan review process to
take place and to ensure the revised action plan is republished within the five-yearly
cycle. 
If you have any comments on this AQAP, please send them to Fiona Maguire at:
Pollution Control and Public Health, Protective Services, Civic Centre, Windmillhill
Street, Motherwell, ML1 1AB
Telephone : 01236 856300
Email : maguiref@northlan.gov.uk
Page 36 of 366

Page 37

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 v
OFFICIAL
OFFICIAL
OFFICIAL
OFFICIAL
Table of Contents
Executive Summary ...................................................................................................
Responsibilities and Commitment ......................................................................... iii
Introduction ............................................................................................................. 10
Summary of Current Air Quality in North Lanarkshire Council .......................... 13
1.1 Nitrogen Dioxide (NO2) .........................................................................................13
1.2 Particulate Matter (PM10) ......................................................................................14
1.3 Particulate Matter (PM2.5) .....................................................................................15
North Lanarkshire Council’s Air Quality Priorities .............................................. 16
1.4 Source Apportionment ..........................................................................................16
1.5 Required Reduction in Emissions .........................................................................21
1.6 Key Priorities ........................................................................................................23
1.7 Links with other North Lanarkshire Council Plans and Strategies .........................24
Development and Implementation of North Lanarkshire Council AQAP ........... 26
1.8 Consultation and Stakeholder Engagement..........................................................26
1.9 Steering Group .....................................................................................................29
AQAP Measures ...................................................................................................... 30
Appendix A: Response to Consultation ............................................................... 37
Appendix B: Reasons for Not Pursuing Action Plan Measures ......................... 50
Appendix C: Trend Graphs of Pollution Levels within the AQMAs .................... 51
Appendix D: Summary of Source Apportionment Analysis within AQMAs ...... 60
Appendix E: Summary of Regional Modelling Studies 2020-2022 ..................... 78
Glossary of Terms .................................................................................................. 86
List of Tables
Table 1: Source Apportionment in Chapelhall ........................................................... 18
Table 2: Source Apportionment in Coatbridge ........................................................... 19
Table 3: Source Apportionment in Motherwell ........................................................... 20 Page 37 of 366

Page 38

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 vi
OFFICIAL
OFFICIAL
OFFICIAL
OFFICIAL
Table 4:Comparison of Statutory Air Quality Objectives and 2021 WHO Guideline
Values ....................................................................................................... 22
Table 5:Statutory Consultees .................................................................................... 26
Table 6: Invitees to Stakeholder Event ...................................................................... 27
Table 7: Air Quality Action Plan Measures ................................................................ 30
List of Figures
Figure 1: Annual Mean Concentrations of NO2 at CM1 Chapelhall ........................... 50
Figure 2: Annual Mean Concentrations of NO2 at CM4 Motherwell ........................... 50
Figure 3: Annual Mean Concentrations of NO2 at CM3 Whifflet ................................ 51
Figure 4: Annual Mean Concentrations of NO2 at CM12 Whifflet A725 ..................... 51
Figure 5: Annual Mean Concentrations of NO2 at CM5 Shawhead Coatbridge ......... 52
Figure 6: Annual Mean Concentrations of NO2 at CM6 Kirkshaws Coatbridge ......... 52
Figure 7: Annual Mean Concentrations of PM10 at CM1 Chapelhall .......................... 53
Figure 8: Annual Mean Concentrations of PM10 at CM4 Motherwell.......................... 53
Figure 9: Annual Mean Concentrations of PM10 at CM3 Whifflet ............................... 54
Figure 10: Annual Mean Concentrations of PM10 at CM12 Whifflet A725 .................. 54
Figure 11: Annual Mean Concentrations of PM10 at CM5 Shawhead Coatbridge ..... 55
Figure 12: Annual Mean Concentrations of PM10 at CM6 Kirkshaws Coatbridge ...... 55
Figure 13: Annual Mean Concentrations of PM2.5 at CM1 Chapelhall ....................... 56
Figure 14: Annual Mean Concentrations of PM2.5 at CM4 Motherwell ....................... 56
Figure 15: Annual Mean Concentrations of PM2.5 at CM3 Whifflet ............................ 57
Figure 16: Annual Mean Concentrations of PM2.5 at CM12 Whifflet A725 ................. 57
Figure 17: Annual Mean Concentrations of PM2.5 at CM5 Shawhead Coatbridge ..... 58
Figure 18: Annual Mean Concentrations of PM2.5 at CM6 Kirkshaws Coatbridge ..... 58
Figure 19: Contribution to Annual Mean NOx Concentrations from Different Source
Types in Chapelhall .................................................................................. 60
Page 38 of 366

Page 39

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 vii
OFFICIAL
OFFICIAL
OFFICIAL
OFFICIAL
Figure 20: Contribution to Annual Mean NOx Concentrations from Different Road
Traffic Sources in Chapelhall- Site 1 Lauchope Street ............................. 60
Figure 21: Contribution to Annual Mean NOx Concentrations from Different Road
Traffic Sources in Chapelhall- Site 2 A73 Main Street .............................. 61
Figure 22: Contribution to Annual Mean PM10 Concentrations from Different Source
Types in Chapelhall .................................................................................. 61
Figure 23: Contribution to Annual Mean PM10 Concentrations from Different Road
Traffic Sources in Chapelhall- Site 1 Lauchope Street ............................. 62
Figure 24: Contribution to Annual Mean PM10 Concentrations from Different Road
Traffic Sources in Chapelhall- Site 2 A73 Main Street .............................. 62
Figure 25: Contribution to Annual Mean PM2.5 Concentrations from Different Source
Types in Chapelhall .................................................................................. 63
Figure 26: Contribution to Annual Mean PM2.5 Concentrations from Different Road
Traffic Sources in Chapelhall- Site 1 Lauchope Street ............................. 63
Figure 27: Contribution to Annual Mean PM2.5 Concentrations from Different Road
Traffic Sources in Chapelhall- Site 2 A73 Main Street .............................. 64
Figure 28: Contribution to Annual Mean NOx Concentrations from Different Source
Types in Motherwell .................................................................................. 64
Figure 29: Contribution to Annual Mean NOx Concentrations from Different Road
Traffic Sources in Motherwell – Site 3 Airbles Road ................................. 65
Figure 30: Contribution to Annual Mean NOx Concentrations from Different Road
Traffic Sources in Motherwell – Site 4 Windmillhill Street ......................... 65
Figure 31: Contribution to Annual Mean NOx Concentrations from Different Road
Traffic Sources in Motherwell – Site 5 Hamilton Road .............................. 66
Figure 32: Contribution to Annual Mean PM10 Concentrations from Different Source
Types in Motherwell  ................................................................................. 66
Figure 33: Contribution to Annual Mean PM10 Concentrations from Different Road
Traffic Sources in Motherwell – Site 3 Airbles Road ................................. 67
Figure 34: Contribution to Annual Mean PM10 Concentrations from Different Road
Traffic Sources in Motherwell – Site 4 Windmillhill Street ......................... 67 Page 39 of 366

Page 40

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 viii
OFFICIAL
OFFICIAL
OFFICIAL
OFFICIAL
Figure 35: Contribution to Annual Mean PM10 Concentrations from Different Road
Traffic Sources in Motherwell – Site 5 Hamilton Road .............................. 68
Figure 36: Contribution to Annual Mean PM2.5 Concentrations from Different Source
Types in Motherwell .................................................................................. 68
Figure 37: Contribution to Annual Mean PM2.5 Concentrations from Different Road
Traffic Sources in Motherwell – Site 3 Airbles Road ................................. 69
Figure 38: Contribution to Annual Mean PM2.5 Concentrations from Different Road
Traffic Sources in Motherwell – Site 4 Windmillhill Street ......................... 69
Figure 39: Contribution to Annual Mean PM2.5 Concentrations from Different Road
Traffic Sources in Motherwell – Site 5 Hamilton Road .............................. 70
Figure 40: Contribution to Annual Mean NOx Concentrations from Different Source
Types in Coatbridge .................................................................................. 70
Figure 41: Contribution to Annual Mean NOx Concentrations from Different Road
Traffic Sources in Coatbridge – Site 6 Whifflet Street ............................... 71
Figure 42: Contribution to Annual Mean NOx Concentrations from Different Road
Traffic Sources in Coatbridge – Site 7 Kirkshaws Road ........................... 71
Figure 43: Contribution to Annual Mean NOx Concentrations from Different Road
Traffic Sources in Coatbridge – Site 8 Calder Street ................................ 72
Figure 44: Contribution to Annual Mean PM10 Concentrations from Different Source
Types in Coatbridge .................................................................................. 72
Figure 45: Contribution to Annual Mean PM10 Concentrations from Different Road
Traffic Sources in Coatbridge – Site 6 Whifflet Street ............................... 73
Figure 46: Contribution to Annual Mean PM10 Concentrations from Different Road
Traffic Sources in Coatbridge – Site 7 Kirkshaws Road ........................... 73
Figure 47: Contribution to Annual Mean PM10 Concentrations from Different Road
Traffic Sources in Coatbridge – Site 8 Calder Street ................................ 74
Figure 48: Contribution to Annual Mean PM2.5 Concentrations from Different Source
Types in Coatbridge .................................................................................. 74
Figure 49: Contribution to Annual Mean PM2.5 Concentrations from Different Road
Traffic Sources in Coatbridge – Site 6 Whifflet Street ............................... 75 Page 40 of 366

Page 41

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 ix
OFFICIAL
OFFICIAL
OFFICIAL
OFFICIAL
Figure 50: Contribution to Annual Mean PM2.5 Concentrations from Different Road
Traffic Sources in Coatbridge – Site 7 Kirkshaws Road ........................... 75
Figure 51: Contribution to Annual Mean PM2.5 Concentrations from Different Road
Traffic Sources in Coatbridge – Site 8 Calder Street ................................ 76
Figure 52: Regional Modelling Study Area of Coverage included Explicitly Modelled
Roads 2021-2022 ..................................................................................... 79
Figure 53:Predicted Annual Mean NO2 Concentration Across Study Area ................ 80
Figure 54:Predicted Annual Mean PM10 Concentration Across Study Area .............. 81
Figure 55:Predicted Annual Mean PM2.5 Concentration Across 7 Study Area ........... 82
Figure 56:Areas of Major Infrastructure Projects in North Lanarkshire ...................... 83
Figure 57: The Pan-Lanarkshire Orbital Transport Corridor ...................................... 84
Page 41 of 366

Page 42

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 10
OFFICIAL
OFFICIAL
OFFICIAL
OFFICIAL
Introduction
This report outlines the actions that North Lanarkshire Council will deliver between
2023-2028 to reduce concentrations of air pollutants and exposure to air pollution;
thereby positively impacting on the health and quality of life of residents and visitors to
the North Lanarkshire Council area.
The AQAP covers all three of North Lanarkshire Council’s AQMAs, namely Motherwell
Town Centre, Chapelhall and Coatbridge, and focuses on the concentrations of
Nitrogen Dioxide (NO2) and Particulate Matter (PM10 and PM2.5) across the North
Lanarkshire Council Area. Compliance with the Air Quality Strategy (AQS) objectives
for other pollutants was met at the start of the LAQM process and there is no monitoring
carried out for other pollutants.  
It has been developed in recognition of the legal requirement on the local authority to
work towards AQS objectives under Part IV of the Environment Act 1995 and relevant
regulations made thereunder and to meet the requirements of the Local Air Quality
Management (LAQM) statutory process.
There has been several years of compliance with the NO2 objectives within the AQMAs
and, in accordance with the requirements of PG (S) (23), North Lanarkshire Council
expects the NO2 element of the Chapelhall and Coatbridge AQMAs to be revoked no
later than 2024 with the remaining AQMAs revoked within the shortest possible time
following sustained compliance with the statutory air quality objectives.
North Lanarkshire continues to be a popular commuter destination with its extensive
trunk road network providing easy access to the major cities of Glasgow, Edinburgh
and Stirling. Several large-scale developments and major infrastructure projects are
proposed in North Lanarkshire over the next decade that have the potential to influence
air quality across North Lanarkshire and the Chapelhall and Motherwell AQMAs in
particular. 
The Glasgow Region City Deal includes several major projects aimed at enabling
regeneration and generating investment in the North Lanarkshire area through
significantly improving transport links and infrastructure and redeveloping sites. There
are three core City Deal projects in North Lanarkshire:
• A8/M8 corridor access improvements Page 42 of 366

Page 43

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 11
OFFICIAL
OFFICIAL
OFFICIAL
OFFICIAL
• Glenboig link road
• Pan Lanarkshire orbital transport corridor
The Pan Lanarkshire Orbital Transport Corridor (the “Pan-Lan”) is a £245.5 million road
improvement project linking the M74 in the south with the M80 on a route through the
Ravenscraig site at the top of Motherwell. The Pan-Lan comprises three distinct
projects:
• East Airdrie Link Road (EALR) – creating a new 10 kilometre road link that
provides a more direct north-south link between the M8 (at the
Newhouse/Eurocentral interchange) to the A73 north of Riggend. This will
enable much of the current A73 through traffic to avoid Chapelhall and should
deliver a significant reduction in traffic-related air pollution in the Chapelhall
AQMA.  It is anticipated that this new road link will also be the main access to
the NHS Lanarkshire New Monklands Hospital (not yet constructed) proposed
for Wester Moffat, near Drumgelloch.
• Ravenscraig Access Infrastructure – creating new and upgraded road
infrastructure from the M74 at Motherwell to the M8 at Eurocentral/Newhouse,
crossing under the West Coast Mainline. Also providing access to the
Ravenscraig major development site.
• Motherwell Town Centre and Rail Station – the redevelopment of Motherwell
Rail Station, led by ScotRail with funding support from Transport Scotland and
SPT. This involves public realm improvements and road layout changes at Muir
Street, Motherwell to create more capacity for buses and new arrangements for
taxis, drop-off and disabled parking. This will reduce traffic congestion in this
part of Motherwell town centre enabling greater free-flow of traffic and provide
additional infrastructure for public transport and active travel interchange at
Motherwell Train Station. The work at Motherwell train station and Muir Street
is now complete and the new facilities opened in June 2023. 
Further detailed information is available on the North Lanarkshire Council website at
Pan Lanarkshire orbital transport corridor.
In addition to the City Deal projects there is also the long-term redevelopment of the
former Ravenscraig steelworks site, to the north of Motherwell. The regeneration and
redevelopment of the Ravenscraig site will involve new housing, employment and
Page 43 of 366

Page 44

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 12
OFFICIAL
OFFICIAL
OFFICIAL
OFFICIAL
commercial development built over a long period of time. It is highly likely that this
development will impact on air quality within the Motherwell area. As part of the Pan
Lanarkshire Corridor project, local and strategic active travel will be delivered to
support wider development and any growth along the corridor.
Another significant project is the planned relocation of the existing NHS Lanarkshire
University Hospital Monklands from Airdrie to an area east of Airdrie known as Wester
Moffat. This site has been approved by the Scottish Government and the projected
opening year for the new hospital at the time of writing is 2031.
The development control process for each of these developments will consider the
potential effects on local air quality and assessments will determine any impact on the
relevant statutory objectives for air quality. Any potential for cumulative impacts on air
quality as development progresses will also be considered in relation to these major
infrastructure projects. Cognisance will be taken of developments close to or impacting
on the AQMAs. 
A map outlining the location of the major developments and the AQMAs is provided in
Figure 56 in Appendix E.
This AQAP will be reviewed every five years and progress on Action Plan Measures
(APMs) reported on annually within the North Lanarkshire Council Annual Progress
Report. 
When all AQMAs are revoked, we will continue to promote the uptake of initiatives and
policies that ensures ongoing protection for local air quality and the health of the
population of NLC and its visitors.
Page 44 of 366

Page 45

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 13
OFFICIAL
OFFICIAL
OFFICIAL
OFFICIAL 
Summary of Current Air Quality in North
Lanarkshire Council 
This section includes a summary of the current air quality in North Lanarkshire. Please
refer to the latest APR3 from North Lanarkshire Council for more detailed information
on site specific concentrations and trends in local air quality. The APR can be viewed
at Air Quality Monitoring in North Lanarkshire | North Lanarkshire Council
Sections 1.1 to 1.3 provide a summary of the monitoring results between 2018-2022.
1.1 Nitrogen Dioxide (NO2)
There were no exceedances of the annual mean AQS objective for NO2 at any of the
continuous monitoring sites in operation over the last five years between 2018 and
2022 or at any of the passive diffusion tube (PDT) monitoring sites since 2019.
There was a significant decrease in measured concentrations across the whole
network in 2020 due to the Covid-19 Pandemic and the various restrictions on activities
and Government advice such as working from home where possible leading to
dramatic reduction in road traffic movements. The established practice of home and
hybrid working has had a continued impact on the method and frequency of travel.
Although traffic movements across North Lanarkshire increased in 2021 and 2022,
they did not return to pre-Pandemic levels which is reflected in the monitoring results.
The monitoring results across the network will continue to be reported in the Annual
Progress Reports to check for continued compliance the objectives. 
Data from the new Whifflet Cross A725 automatic roadside monitoring site that was
commissioned in 2021 will enable North Lanarkshire Council to check if measured 
3 Annual Progress Report (APR), In fulfilment of Part IV of the Environment Act 1995, North
Lanarkshire Council August 2022
Page 45 of 366

Page 46

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 14
OFFICIAL
OFFICIAL
OFFICIAL
OFFICIAL
concentrations at locations where there is significant potential for public exposure
within the Coatbridge AQMA are consistently compliant with the AQS objectives prior
to making any decisions regarding revocation. 
There were no exceedances of the hourly mean objective level at the automatic air
monitoring stations in operation between 2018 and 2022. 
A study carried out on behalf of Defra and the Devolved Administrations4 identified that
exceedances of the NO2 1-hour mean are unlikely to occur where the annual mean is
below 60µg/m3.  There were no measured annual mean concentrations in excess of
60 µg/m3 in the same period indicating compliane with the 1-hour mean objective
across the North Lanarkshire Council Region.
The graphs in Figures 1 to 6 in Appendix C show the trend in annual mean NO2
concentrations at continuous monitoring sites within the AQMAs.
1.2 Particulate Matter (PM10)
There were no exceedances of the annual mean AQS objective for PM10 at any of the
continuous monitoring sites in operation between 2018 and 2022.
As for NO2, due to Covid-19 Pandemic restrictions, PM10 concentrations at all sites
decreased in 2020 and increased again in 2021/22 but remained below 2019 pre-
Pandemic concentrations.  The reduction in road traffic movements in 2020 and 2021
did not result in the same magnitude of reduction in PM10 concentrations as for NO2,
as a significant amount of the total emissions across North Lanarkshire are from non-
traffic sources including industrial, agricultural, waste management and energy
generation facilities as demonstrated in the Source Apportionment tables for the
AQMAs in Section 1.4.
There were no monitored exceedances of the 24-hour AQO for PM10 between 2018-
2021. 
4 Local Air Quality Management Technical Guidance (TG22) -Defra August 2022
Page 46 of 366

Page 47

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 15
OFFICIAL
OFFICIAL
OFFICIAL
OFFICIAL
The PM10 monitoring network has been enhanced by the commissioning of the two
new monitoring sites at Whifflet Cross within the Coatbridge AQMA, and Ravenscraig.
The graphs in Figures 7 to 12 in Appendix C show the trend in annual mean PM10
concentrations at continuous monitoring sites within the AQMAs.
1.3 Particulate Matter (PM2.5)
There were no exceedances of the annual mean AQO for PM2.5 recorded at any of the
monitoring sites in in operation between 2018 and 2022 in North Lanarkshire.
PM2.5 concentrations measured in 2021 and 2022 were similar to those measured in
2020, and slightly below those of 2019. It is unclear if this is related to reduced road
traffic as a result of the Covid-19 pandemic as a significant amount of the total PM2.5
emissions across North Lanarkshire are from non-traffic sources as for PM10 and rural
background sources contribute up to 85% of the measured concentrations within North
Lanarkshire.
The PM2.5 monitoring network has been enhanced by the commissioning of the two
new monitoring sites at Whifflet Cross within the Coatbridge AQMA, and Ravenscraig. 
The graphs in Figures 13 to 18 in Appendix C show the trend in annual mean PM2.5
concentrations at continuous monitoring sites within the AQMAs.
Page 47 of 366

Page 48

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 16
OFFICIAL
OFFICIAL
OFFICIAL
OFFICIAL
North Lanarkshire Council’s Air Quality
Priorities
1.4 Source Apportionment
The AQAP measures presented in this report are targeted towards the predominant
sources of emissions within North Lanarkshire Council’s area. 
A source apportionment exercise was carried out by North Lanarkshire Council in 2018
with reference to the 2017-based National Atmospheric Emissions Inventory (NAEI)5. 
The data was used to evaluate the emissions contributions from multiple source types
within 1 km x 1 km grid squares covering the AQMAs. For each grid square, the road
source emissions were further analysed to identify contributions from motorcycles,
cars, light goods vehicles (LGVs), buses, and heavy goods vehicles (HGVs) using
emissions factors and vehicle split information from Department of Transport data.
Dispersion modelling was used to calculate the contribution to ambient annual mean
concentrations of each pollutant from the main source groups at roadside receptors at
different locations within each AQMA.  The results within each AQMA are summarised
in Appendix D.
In summary, concentrations of particulates within each of the AQMAs are dominated
by rural background sources, while NO2 concentrations are dominated by road
transport sources, in particular cars and LDVs.  
The 1 km x 1 km grid square emissions were updated for expanded regional modelling
studies in 2021 and 2022 using updated versions of the NAEI with no significant
variation in the dominant sources.  The modelled contributions to concentrations at
roadside receptors within the AQMAs are therefore dominated by the same principal
sources. 
Table 1- 
5 https://naei.beis.gov.uk/data/
Page 48 of 366

Page 49

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 17
OFFICIAL
OFFICIAL
OFFICIAL
OFFICIAL
Pollutant Emissions Source Apportionment (NAEI 2020)
Average Contribution to Annual
Mean Concentration at Roadside
Receptors in the AQMA
Roads
Other
mobile (inc.
air and rail)
&
Machinery
Combustion
Plant
Other
including
Rural/Long
Range
Transportation
Traffic Rural
Background Other
NO2 75% 5% 3% 17%
48%
(c.80%/20%
Cars,
Motorbikes &
LGV/Buses,
Taxis &
HGV)
40% 12%
PM10 36% 2% 1% 61%
10%
(c.80%/20%
Cars,
Motorbikes &
LGV/Buses,
Taxis &
HGV)
85% 5%
PM2.5 31% 3% 1% 65%
10%
(c.80%/20%
Cars,
Motorbikes &
LGV/Buses,
Taxis &
HGV)
85% 5%
Page 49 of 366

Page 50

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 18
OFFICIAL
OFFICIAL
OFFICIAL
OFFICIAL 
Table 3 provide a summary of the emissions source apportionment for 2020 and the
average contribution each group of sources makes to the modelled concentrations in
each AQMA.   
Prioritising the reduction in emissions from LDVS (cars, taxis and vans) across North
Lanarkshire to reduce ambient concentrations of NO2 will also have the impact of
reducing ambient particulate concentrations, but by a significantly smaller margin as
contributions from other sources including agriculture dominate.  
Page 50 of 366

Page 51

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028        19
OFFICIAL OFFICIAL
OFFICIAL OFFICIAL
Table 1: Source Apportionment in Chapelhall
Pollutant Emissions Source Apportionment (NAEI 2020) Average Contribution to Annual Mean Concentration at
Roadside Receptors in the AQMA 
Roads Other mobile (inc. air and
rail) & Machinery Combustion Plant
Other including
Rural/Long Range
Transportation
Traffic Rural Background Other
NO2 73% 10% 8% 9%
50%
(c.80%/20% Cars,
Motorbikes & LGV/Buses,
Taxis & HGV)
35% 15%
PM10 37% 8% 0% 55%
13%
(c.75%/25% Cars,
Motorbikes & LGV//Buses,
Taxis & HGV)
85% 2%
PM2.5 37% 12% 2% 49%
13%
(c.75%/25% Cars,
Motorbikes & LGV/Buses,
Taxis & HGV)
85% 2%  
Page 51 of 366

Page 52

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028        20
OFFICIAL OFFICIAL
OFFICIAL OFFICIAL 
Table 2: Source Apportionment in Coatbridge
Pollutant Emissions Source Apportionment (NAEI 2020) Average Contribution to Annual Mean Concentration at
Roadside Receptors in the AQMA 
Roads Other mobile (inc. air and
rail) & Machinery Combustion Plant
Other including
Rural/Long Range
Transportation
Traffic Rural Background Other
NO2 75% 5% 3% 17%
48%
(c.80%/20% Cars,
Motorbikes & LGV/Buses,
Taxis & HGV)
40% 12%
PM10 36% 2% 1% 61%
10%
(c.80%/20% Cars,
Motorbikes & LGV/Buses,
Taxis & HGV)
85% 5%
PM2.5 31% 3% 1% 65%
10%
(c.80%/20% Cars,
Motorbikes & LGV/Buses,
Taxis & HGV)
85% 5%  
Page 52 of 366

Page 53

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028        21
OFFICIAL OFFICIAL
OFFICIAL OFFICIAL 
Table 3: Source Apportionment in Motherwell
Pollutant Emissions Source Apportionment (NAEI 2020) Average Contribution to Annual Mean Concentration at
Roadside Receptors in the AQMA 
Roads Other mobile (inc. air and
rail) & Machinery Combustion Plant
Other including
Rural/Long Range
Transportation
Traffic Rural Background Other
NO2 52% 8% 12% 28%
42%
(c.80%/20% Cars,
Motorbikes & LGV/Buses,
Taxis & HGV)
35% 23%
PM10 24% 3% 0% 73%
25%
(c.80%/20% Cars,
Motorbikes & LGV/Buses,
Taxis & HGV)
60% 15%
PM2.5 21% 5% 0% 74%
25%
(c.80%/20% Cars,
Motorbikes & LGV/Buses,
Taxis & HGV))
60% 15% 
Page 53 of 366

Page 54

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 22
OFFICIAL OFFICIAL
OFFICIAL OFFICIAL
1.5 Required Reduction in Emissions
The required reduction in emissions is an estimate in the improvement in air quality
required to achieve compliance with the National Air Quality Strategy (NAQS)
objectives for NO2, PM10 and PM2.5 within each of the AQMAs. The results contained
within Sections 1.1-1.4 of the report indicate that measured concentrations of NO2,
PM10 and PM2.5 within each of the AQMAs and across the monitoring network are
currently in compliance with NAQS objectives.
Regional scale modelling6demonstrate that there are other areas such as within
Community Growth Areas and sites close to City Deal infrastructure projects where
there is the potential for future exposure to result in elevated concentrations of air
appropriate for the Council to target a continued improvement in local air quality, such
that contributions from new developments do not result in any further degradation of
air quality at both hot spot locations and more widely.
A further factor to consider is that the World Health Organisation (WHO) has deemed air
pollution as the second highest risk factor for non-communicable diseases and has
consequently in 2021 published new guideline values for certain air pollutants Ambient
(outdoor) air pollution (who.int).  The 2021 WHO guideline values are more stringent
than current statutory air quality objectives in Scotland. A comparison of the current air
quality objectives and WHO guideline values is shown in Table 4.
6 Extended and Updated Regional Air Quality Model for North Lanarkshire Council 2021/2022 –
Expansion into Wishaw/Newmains – ITPEnergised report 4382- April 2022.
Page 54 of 366

Page 55

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 23
OFFICIAL OFFICIAL
OFFICIAL OFFICIAL
Table 4:Comparison of Statutory Air Quality Objectives and 2021 WHO
Guideline Values
Pollutant Averaging Period Current Air Quality
Objective (Scotland)
WHO Guideline Value
(2021)
NO2
Annual Mean
(µg/m3) 40 10
PM10
Annual Mean
(µg/m3) 18 15
PM2.5
Annual
Mean(µg/m3) 10 5
1.6 Key Priorities
Our priorities are to minimise emissions from road traffic from LDVs including private
cars, taxis and vans, reducing short journeys and increasing and promoting low
emissions, public transport and active travel alternatives.
• Priority 1 – We will investigate air quality around schools in North Lanarkshire
with a focus on drop-off and pick-up times.
• Priority 2 – We will facilitate modal shift from private car use to active travel
and public transport.
• Priority 3 – We will improve active travel options to NLC hubs.
• Priority 4 – as a council we will lead by example in taking measures to reduce
air pollution in North Lanarkshire, including decarbonisation of the Council’s
vehicle fleet.
• Priority 5 – we will undertake a comprehensive review of air quality monitoring
to optimise resources and coverage across North Lanarkshire.
• Priority 6 – We will increase EV infrastructure across North Lanarkshire.
Page 55 of 366

Page 56

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 24
OFFICIAL OFFICIAL
OFFICIAL OFFICIAL
1.7 Links with other North Lanarkshire Council Plans
and Strategies
In preparing this AQAP a review has been undertaken of all Council policies which
have an overlap or input to the AQAP and the improvement of air quality in North
Lanarkshire. Input from steering group members has facilitated this. North Lanarkshire
Council Plans and policies can be viewed in full at Council and partnership strategies,
policies, and plans | North Lanarkshire Council however a brief outline of the most
relevant plans is outlined below:
North Lanarkshire Council Climate Plan and Routemap – North Lanarkshire
Council has a statutory duty to reduce carbon emissions, adapt to climate change and
act sustainably. In recognition of the threat of increased global temperatures, the
Council declared a climate emergency setting a target of net-zero greenhouse gas
emissions by 2030 for North Lanarkshire. The Council’s response to climate change
and how it will progress towards its target by 2030 is set out in the document Climate
Plan Action on Climate Together (ACT) 2030 supported by a list of multi service
actions.
North Lanarkshire Council has recognised the link between climate change and air
quality. As such APM 6, specific to air quality and climate change has been included
to maximise opportunities for co-benefits in these areas of responsibility. 
Active Travel Strategy 2021-2031 – The Active Travel Strategy (ATS) aims to create
a wide range of (transport) connections across North Lanarkshire which can be used
for everyday journeys such as travelling to access employment, education or meeting
essential needs in addition to recreational purposes. Key targets of the Strategy
include increasing the number of cycle parking spaces at local amenities, employment
centres, transport links and Town and Community Hubs, and introducing additional
walking, wheeling, and cycling connections to key destinations and local community
hubs. Both key ATS targets are reflected in the APMs within this AQAP. The Active
Travel Strategy can be accessed here Active Travel Strategy | North Lanarkshire
Council
Page 56 of 366

Page 57

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 25
OFFICIAL OFFICIAL
OFFICIAL OFFICIAL
Local Transport Strategy – North Lanarkshire Council’s LTS is due for update in
2023/24. Measures within the AQAP will be considered as part of this update. The LTS
can be accessed here Local Transport Strategy 2010.pdf (northlanarkshire.gov.uk)
National Planning Framework 4 - National Planning Framework (NPF) 4 came into
force in February 2023. It contains a raft of Policies that have to be taken into account
as a whole in determining planning applications, with an emphasis on tackling the
climate emergency. Air quality and the potential requirement for air quality
assessments are specifically mentioned in Policy 23 (d) and in the vision for Central
Scotland. NPF 4 can be accessed here National Planning Framework 4 - gov.scot
(www.gov.scot)
Local Development Plan – North Lanarkshire Council’s Local Development Plan
(LDP) was Adopted and implemented in July 2022. This is the land use planning
strategy for the coming 5-10 years and it focuses on Promoting development locations
and Protecting assets. Air quality is specifically mentioned in the LDP in the section on
Placemaking Environment and Design Qualities (EDQ) for Development. Category
EDQ2 includes air quality as a Special Feature for Consideration for proposed
development. Also, within EDQ3 Policy section of the LDP there is reference to air
quality as one of a number of considerations in relation to planned development.
Particular note is made of proposed development within or adjacent to AQMAs which
are detailed on the LDP’s Protect Map. The Policies are written in such a way as to
apply to any AQMA the Council designates in the future during the lifetime of the Local
Development Plan. The Local Development Plan can be accessed here The North
Lanarkshire Local Development Plan | North Lanarkshire Council
North Lanarkshire Council Environment Pathway – the Environment Pathway
brings together several strategies, action plans and policies which contribute to the
development and protection of the environment. Cognisance was taken in the
preparation of this AQAP update of all relevant plans under the Environment Pathway.
The Environment Pathway can be accessed here Environment Pathway | North
Lanarkshire Council
North Lanarkshire Council Biodiversity Action Plan 2023-2027 – this plan
recognises the benefits of air quality regulation in providing the ecosystems necessary
to ensure biodiversity can thrive and grow. The Biodiversity Action Plan can be
accessed here Our local biodiversity | North Lanarkshire CouncilPage 57 of 366

Page 58

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 26
OFFICIAL OFFICIAL
OFFICIAL OFFICIAL
In addition to North Lanarkshire Council plans and policies cognisance was also taken
of the Scottish Government document Cleaner Air for Scotland – CAFS 2 Cleaner Air
for Scotland 2 - Towards a Better Place for Everyone - gov.scot (www.gov.scot)
Published in 2021, CAFS 2 sets out how the Scottish Government will deliver further
air quality improvements based on a delivery plan with ten priorities. Of the ten there
are three that relate directly to this AQAP update: 
Placemaking – we promote and support the place principle with place-based
approaches, delivering air quality improvements as a direct co-benefit of
sustainable places. This relates to Action Plan Measure 8- Placemaking.
Behaviour change – ensure the Scottish public are aware of air pollution issues
and are empowered to make behaviour changes that contribute towards
improving air quality and reducing exposure. This relates to Action Plan
Measure 11 – awareness raising and joint working on air quality initiatives such
as Clean Air Day.
Transport – we will support a modal shift to active travel and public transport.
This will mean, among other objectives, encouraging SPT in their remit to
provide a transport system that facilitates active travel choices and public
transport provision. The Council will also utilise measures to improve traffic flow,
and consequently air quality, including parking enforcement and Vehicle
Emission Testing and Vehicle Idling patrols, especially in urban centres where
pollution and congestion are most acute. This is covered in Action Plan
Measures 1 and 3. 
Development and Implementation of North
Lanarkshire Council AQAP
1.8 Consultation and Stakeholder Engagement
In developing/updating this AQAP, we have worked with other local authorities,
agencies, businesses, and the local community to improve local air quality. Schedule
11 of the Environment Act 1995 requires local authorities to consult the bodies listed
in Table 5.
Page 58 of 366

Page 59

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 27
OFFICIAL OFFICIAL
OFFICIAL OFFICIAL
Table 5:Statutory Consultees
Consultee Consultation Undertaken
The Scottish Government Yes
The Scottish Environment Protection Agency  (SEPA) Yes
Transport Scotland Yes
All neighbouring local authorities Yes
Other public authorities as appropriate, such as NHS Scotland and Health
Boards Yes
Bodies representing local business interests and other organisations such
as community groups as appropriate Yes
In addition to engaging with the statutory consultees listed in Table 5 we have also
undertaken the following stakeholder engagement in the process of updating the
AQAP:
• Two meetings of relevant stakeholders from within the Council, and external
interested parties. Invites were extended to the statutory consultees as well as
a wider variety of other relevant stakeholders and Elected Members from
across the relevant political parties. Other relevant organisations such as active
travel organisations, transport bodies etc. were also invited to take part in the
process of developing new APMs and the subsequent consultation on these.
Attendees invited to the two stakeholder events are listed in 6.
• Following the two stakeholder events the proposed APMs were then presented
as an online public consultation by means of a questionnaire. This
questionnaire asked respondents to state their support for the proposed APMs
on a scale. Also included for each question was an open comments facility for
respondents to enter any additional comments they may have. The online
consultation ran for over 6 weeks in December 2022/January 2023 and was
widely publicised on social media and the Council website. Individual emails
were also sent out to all relevant stakeholders it was felt may have in interest
in responding to the survey as shown in Table 6. This included community
Page 59 of 366

Page 60

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 28
OFFICIAL OFFICIAL
OFFICIAL OFFICIAL
council contacts, NHS Lanarkshire, Lanarkshire Chamber of Commerce etc.  A
full analysis of the outcome of the online questionnaire consultation is given in
Appendix A. 
Table 6: Invitees to Stakeholder Event
NLC Service/External Organisation Attended Did not attend
NLC Roads √
NLC Planning and Place √
NLC Climate Change √
NLC Waste and Fleet √
NLC City Deal √
NLC Education √
NLC Greenspace √
NLC Senior Management Team √
NLC Pollution Control √
NLC Elected Members √
Glasgow City Council √
South Lanarkshire Council √
Falkirk Council √
West Lothian Council √
East Dunbartonshire Council √
SPT √
Sustrans √
Living Streets √
Cycling Scotland √
ITP Energised √
Page 60 of 366

Page 61

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 29
OFFICIAL OFFICIAL
OFFICIAL OFFICIAL
NLC Service/External Organisation Attended Did not attend
Scottish Government √
SEPA √
Transport Scotland √
EP Scotland √
1.9 Steering Group
North Lanarkshire Council has an established track record of liaising with other Council
Services when preparing APRs or updates to the AQAP. For the preparation of this
update to the AQAP, preparations began in Summer 2022 with the establishment of a
Steering Group comprising relevant internal stakeholders. The Council recognises the
importance of commitment from other services in realising the success of APMs, and
the inclusion of any policies and areas of work that feed into the AQAP. In the
preparation of this AQAP, update meetings were held with officers from relevant
service areas across the council to prepare an initial suggested list of APMs. Officers
involved in this exercise are listed in the Responsibilities and Commitment section
detailed previously. 
Once the draft list of new APMs was created, two stakeholder meetings were held.
Invitations were sent to the officers listed as well as other key personnel from across
relevant services, along with Elected Members and external stakeholders. The first
stakeholder meeting comprised short presentations on relevant air quality issues and
the draft APMs were outlined and discussed in small working groups. Stakeholder
responses were considered and included in the refinement of the draft APMs.
Thereafter further targeted meetings were held with steering group members to agree
the wording of the draft APMs and a second stakeholder meeting was held to finalise
the proposed APMs. This involved the same cohort of attendees and was well attended
with enthusiastic and fruitful discussion from the members. Detailed information on the
attendees at both stakeholder meetings is included in Table 6. 
Page 61 of 366

Page 62

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 30
OFFICIAL OFFICIAL
OFFICIAL OFFICIAL
AQAP Measures
Table 7 shows the North Lanarkshire Council AQAP measures. It contains:
• A list of the measures that form part of the plan.
• Expected or actual completion year for measures.
• Measure status (whether the measures are planned, in progress, completed or
delayed)
• The responsible individual and departments/organisations who will deliver
these measures.
• How the measure will be funded (Scottish Government or other).
• Estimated cost of implementing each measure (overall cost and cost to the
local authority).
• Expected benefit in terms of pollutant emission and/or concentration reduction.
• Key milestones towards delivery.
Page 62 of 366

Page 63

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 -2028  31
OFFICIAL OFFICIAL
Priority Actions are shaded as follows:
Table 7: Air Quality Action Plan Measures
Measure
No. Measure Category and
Classification
Expected/Actual
Completion Year
Measure
Status
Delivery
Organisation(s)
Funding
Source Funding Status
Estimated
Cost of
Measure
Target Reduction
in Pollutant /
Emission from
Measure
Key Milestones Comments
1 Facilitate modal shift from private
car use to active travel and public
transport including:
a) Input to the Local Transport
Strategy
Alternatives to
Private Vehicle Use
2024 Planned
NLC
Roads/Protective
Services/SPT
No extra
funding
required
N/A N/A Unknown Publication of LTS
b) Pre- and post- implementation
monitoring of strategic active
travel infrastructure projects,
including traffic counts, speed
and air quality will be
undertaken.
2024-2026 Planned
NLC Protective
Services/
NLC Roads
Variety of
Sources
depending on
works
required
Ongoing funding
required
<£10K per
year
Unknown at this
stage
Collation of
evidence from one
key active travel
intervention 
Evidence used to demonstrate
if health benefits are achieved
where modal shift increases
will be used to make case for
implementation of further
schemes in other communities
c) Complete an audit of public
transport across North
Lanarkshire, looking at things
such as key commuter routes to
main centres of employment, out
of hours provision and age of
fleet
2024/2025 Planned Protective
Services/
External
Consultant/
SPT
Scottish
Government
Air Quality
Grant
Not funded £10-50K No target
reduction in
emissions
Completion of initial
study and thereafter
determine what
action may be
required
North Lanarkshire Council does
not have control over the
provision of public transport,
including buses. It is important
to note that NLC can only
identify gaps in provision and
pass the analysis to SPT
2 Investigate air quality around
schools in North Lanarkshire with
focus on drop-off and pick-up
times:
a) Review of existing monitoring
network and deployment of
additional monitoring equipment
where necessary
Promoting Travel
Alternatives
Initial round by end
2023 for data
collection in 2024
planned Protective
Services
Scottish
Government
Air Quality
Grant
Ongoing funding
required
Re-
deployment
of current
equipment
in first pilot
Data gathering will
determine target
reduction
Initial review of
existing network
Further milestones
defined after initial
review
Review Completion
Page 63 of 366

Page 64

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 -2028  32
OFFICIAL OFFICIAL
Measure
No. Measure Category and
Classification
Expected/Actual
Completion Year
Measure
Status
Delivery
Organisation(s)
Funding
Source Funding Status
Estimated
Cost of
Measure
Target Reduction
in Pollutant /
Emission from
Measure
Key Milestones Comments
b) Establish Air Quality Champion
Schools in each of our AQMAs,
and other relevant areas looking
at School Travel Planning and
behaviour change campaigns to
encourage sustainable travel
to/from school for both pupils
and staff working in the school
3 pilot schools in
programme by end
of 2027
Planned NLC
Education
and Families,
Other NLC
Services and
external
partners as
required.
Variety of
Sources
depending on
project
Ongoing funding
required
£10-50k Unknown, but
anticipated
reduction in
emissions locally
at schools
involved in project
Monitoring before
and after
interventions to test
effectiveness on
local air quality
Ties in with climate action
work being carried out in
schools in NLC with funding
obtained for this.
3 Improve Active Travel Options to
North Lanarkshire Community
hubs:
a) Audit existing infrastructure
2023-2028 Planned NLC Roads
External
Consultant
NLC Capital
Budget
External
funding
Not Funded £10K-20K
Unknown until
assessment of
existing
infrastructure
carried out
Report on provision
and
recommendations
for improvements
b) Publicity campaigns to promote
options 2023-2028 Planned
Corporate
Communicati
ons
Roads
Protective
Services
No extra
funding
required
Not funded NA Unknown Publicity campaign
undertaken and
thereafter
completion of
campaign
To minimise car journeys to
NLC buildings by staff and
public
4 Lead by example in taking
measures to reduce air pollution in
North Lanarkshire:
a) In line with the Council’s
approved Leadership/Operating
Model we will support home
working and the use of hubs in
addition to fixed work locations to
reduce workplace travel
Ongoing In progress All Services N/A N/A N/A N/A Ongoing
Page 64 of 366

Page 65

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 -2028  33
OFFICIAL OFFICIAL
Measure
No. Measure Category and
Classification
Expected/Actual
Completion Year
Measure
Status
Delivery
Organisation(s)
Funding
Source Funding Status
Estimated
Cost of
Measure
Target Reduction
in Pollutant /
Emission from
Measure
Key Milestones Comments
b) We will enhance the digital
delivery of services to reduce the
need for employees and
customers to travel to council
buildings
Ongoing In progress All Services
NLC Digital
Services
NLC Budget N/A £100-500K
Anticipated
continued
reduction in
emissions due to
less car travel.
,
Ongoing
c) We will continue to offer and
promote the Cycle to Work
scheme for employees of North
Lanarkshire. We will also look to
introduce a lease scheme for
Electric/Ultra Low Emission
Vehicles for Council employees.
Ongoing In progress All Services NLC Budget Ongoing Unknown Unable to quantify
at this time
Ongoing initiative to
promote Active
Travel in NLC
employees
5 Review of Monitoring Network to
optimise resources and coverage
across North Lanarkshire
Policy Guidance and
Control 2023-2025 Planned
Protective
Services
External
consultant
Scottish
Government
Air Quality
Grant
Funding required £10K-20K Compliance with
AQS Objectives at
new sites for PDT
and Continuous
Monitors
Initial round of
review by Oct/Nov
2023 for data
collection in 2024
Annually reviewed
during AQAP
Will enable some baseline
monitoring to be undertaking
prior to the commencement of
construction on significant
infrastructure schemes
6 Ensure air quality and climate
change policy actions in North
Lanarkshire enjoy a relationship
with co-benefits for both areas. 
a) We will work towards the
decarbonisation of the NLC fleet.
2023-2028 and
beyond In progress NLC Waste and
Fleet Services
New-build
Housing Team
Planning, 
NLC Capital
Funding Bid
and other
sources
Will require
significant
expenditure and
accordingly the
rate at which the
fleet will move
away from existing
petrol and diesel
vehicles will be
determined by the
level of internal
funding and the
levels available
from any external
source. 
£50m-
£100m
Unknown,  but
NLC is major
employer in area
so expect
reasonable
emission reduction
as fleet moves to
full
decarbonisation
Proportion of fleet
decarbonised
reported annually.
Decarbonisation of fleet is key
target within NLC Climate
Change Route map RSWS4
To cease the purchase of any
new petrol or diesel LGV
vehicles by 2025 and no petrol
or diesel purchases after 2030
in line with Scottish
Government target for public
fleets. The Council is now
actively engaged to determine
the feasibility of this task and
will publish its vehicle
replacement programme for
Page 65 of 366

Page 66

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 -2028  34
OFFICIAL OFFICIAL
Measure
No. Measure Category and
Classification
Expected/Actual
Completion Year
Measure
Status
Delivery
Organisation(s)
Funding
Source Funding Status
Estimated
Cost of
Measure
Target Reduction
in Pollutant /
Emission from
Measure
Key Milestones Comments
2024/29 at the end of the
current financial year
b) we will increase EV charging
infrastructure within council new-
build development. 2023-2028 and
beyond
In progress NLC Housing NLC budget Ongoing
Unknown Unknown Number of Council
houses built with EV
included reported
annually.
Increasing EV charging in
council new-builds is key target
within Climate Change Route
map PR2
c) We will increase EV charging
infrastructure across North
Lanarkshire 2023-2028 and
beyond
In progress
Partner Local
Authorities within
the Glasgow City
Deal Region
Unknown Unknown Increase in public
EV points reported
annually
We are currently working with
our partner local authorities
within the Glasgow City
Region to look at the
possibility of a partnership
approach with the private
sector to accelerate the
number of charging points
available across the region.
7 We will ensure air quality has greater
importance in NLC’s procurement and
contract processes in terms of the
sustainable procurement duty
requirement as outlined in Section 9 of
the Procurement Reform (Scotland)
Act 2014
2023-2028 then
ongoing In progress
NLC
Procurement
All NLC Services
No Budget
Implications
Funding not
required
No cost Unknown Ongoing
8 Aligning Planning and Air Quality
Guidance and Placemaking Targets
outlined in CAFS 2
a) We will continue to ensure that
air quality is a material
consideration in development
Ongoing
Ongoing
Planning and
Place
N/A N/A No cost Applying this
policy to all
Providing air quality
updates as
Page 66 of 366

Page 67

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 -2028  35
OFFICIAL OFFICIAL
Measure
No. Measure Category and
Classification
Expected/Actual
Completion Year
Measure
Status
Delivery
Organisation(s)
Funding
Source Funding Status
Estimated
Cost of
Measure
Target Reduction
in Pollutant /
Emission from
Measure
Key Milestones Comments
management decisions and
where appropriate will promote
best practice to realise air quality
improvements such as
connectivity to active/public
transport
b) We will ensure air quality is
included in any revisions to the
Local Development Plan and
take due cognisance of air
quality requirements that are
included in National Planning
Framework 4.
Protective
Services
development
management
decisions will see
an overall
reduction in air
pollution
necessary to
changes in NLC
Planning Policy and
Guidance
9 Revoke the NO2 element of the
Chapelhall and Coatbridge AQMAs
2024
Planned
Protective
Services
No funding
required
No funding
required
No funding
required
N/A Revocation
achieved in 2024
10 Continuation, Expansion and
Promotion of Ecostars Environmental
fleet recognition scheme  
a) An Eco Stars taxi operator
scheme will be set up in North
Lanarkshire in addition to the
Eco Stars Fleet Scheme
b) We will promote the NLC Eco
Stars scheme to Council
contractors and endeavour to
ensure they are members.
Promoting Vehicle
efficiency
Ongoing In Progress NLC Protective
Services /NLC
Licensing
Services
Scottish
Government
Air Quality
Grant
Ongoing Funding
Required
£20k per
annum for
both fleet
and taxi
schemes
Anticipated
reasonable
emission reduction
as more vehicles
join EcoStars
schemes
Annual membership
increase
Provides opportunities for joint
working with neighbouring
authorities to run Eco Stars
awareness raising workshops
11 Raising awareness including through
Clean Air Day, Vehicle Emissions Testing
and Idling Campaigns
Public Information 5 VET days/year
c.100 Vehicle Idling
Patrols/year
CAD event in place
June 2023
Subject to
annual
review
Protective
Services 
Partner agencies
Neighbouring
authorities
Scottish
Government
air quality
grant
Funding required <£10K Unknown CAD event annually Collaborative working with
neighbouring authorities as
encouraged by CAFS 2
Page 67 of 366

Page 68

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 -2028  36
OFFICIAL OFFICIAL
Measure
No. Measure Category and
Classification
Expected/Actual
Completion Year
Measure
Status
Delivery
Organisation(s)
Funding
Source Funding Status
Estimated
Cost of
Measure
Target Reduction
in Pollutant /
Emission from
Measure
Key Milestones Comments
12 Continue our ongoing engagement with
the Enterprise Projects Team to ensure
that air quality is given appropriate
consideration in City Deal projects
Transport Planning
and Infrastructure
2023-2028
In progress Protective
Services
Enterprise
Projects Team
No funding
required
No funding
required
No cost Anticipated
reduction in
emissions
Delivery of City Deal
Projects with
relevant AQ input
To ensure AQ is appropriately
considered in City Deal
projects preventing
degradation of AQ
NB: Please see future Annual Progress Report for annual updates on implementation of these measures.
Page 68 of 366

Page 69

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 37
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Appendix A: Response to Consultation
Online Public Consultation
As outlined earlier in the report, in the process of writing this updated AQAP we have
undertaken an online public consultation exercise using online questionnaire software.
The public consultation involved listing the proposed APMs and asking respondents to
state their support for the APM using the scale Strongly Agree/ Agree/
Neutral/Disagree/Strongly Disagree. For each proposed APM an open text box was
included for respondents to record their own additional comments. The online public
consultation ran for 6 weeks in December 2022/ January 2023. It was widely publicised
through the Council’s social media channels and on the Council website. Individual
emails were also sent out directly to anyone it was felt would have an interest in
responding, including the statutory consultees, community council representatives,
NHS Lanarkshire and the Lanarkshire Chamber of Commerce. 
The public consultation attracted 243 responses, 235 from individuals and 8 from
organisations. The findings of the online public consultation are summarised below.
Q1 - We will encourage the move from private car use to "active travel" and
public transport. By "active travel" we mean - walking/cycling/scooting 
% Responses
Strongly agree 22% 52
Agree 24% 57
Neutral 14% 34
Disagree 17% 41
Strongly disagree 22% 52
Total  236
As can be seen from the analysis just under half of respondents agreed with this APM,
with a small amount neutral and slightly more than a third not in agreement. This
question attracted 124 open comments/opinions. Approximately two thirds of these
commented that Active Travel infrastructure and public transport provision in North
Lanarkshire is currently not good enough to encourage most people to switch from
private cars to active travel or public transport. Several commented that some people Page 69 of 366

Page 70

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 38
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
rely on their car (e.g., disabled, elderly), and some were concerned about the safety
aspect of Active Travel compared to private car use. 
Q2 - We will monitor air quality and compare traffic levels and speed before and
after the Council’s proposed active travel infrastructure projects, including
traffic counts, speed and air quality. 
% Responses
Strongly agree 28% 64
Agree 32% 73
Neutral 19% 44
Disagree 6% 14
Strongly disagree 15% 35
Total  230
Just under two thirds of respondents agreed with this measure. The majority of the 77
open comments also voiced agreement with all or part of this APM. Although not
directly relevant to air quality some comments were made in relation to safety concerns
regarding the speed of traffic. 
Page 70 of 366

Page 71

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 39
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Q3 - We will undertake an audit of bus provision in North Lanarkshire, looking at
things such as:
key commuter
routes to
employment
out of hours public
transport provision
the age of the public
bus fleet operating in
North Lanarkshire
fuel type of the
public bus fleet
(i.e.  diesel etc.)
Strongly agree 47% 112 48% 114 44% 104 45% 107
Agree 33% 79 34% 81 38% 90 33% 80
Neutral 11% 27 8% 19 12% 29 13% 31
Disagree 3% 6 3% 7 1% 3 4% 9
Strongly disagree 7% 16 8% 18 5% 13 5% 13
Total 240 239 239 240
There was a high level of support for this APM, which reinforces the opinion expressed
in Q1 regarding the perceived insufficient level of public transport currently in North
Lanarkshire. 
Page 71 of 366

Page 72

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 40
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Q4 - We will look at the existing air quality monitoring network and ensure we
have adequate air quality monitoring around appropriate NLC schools, installing
further monitoring if necessary. 
% Responses
Strongly agree 45% 104
Agree 26% 61
Neutral 15% 34
Disagree 3% 8
Strongly disagree 11% 25
Total 100% 232
Again, the respondents showed broad agreement with this proposed APM, with 71%
either agreeing or strongly agreeing. This was again borne out in the open comments,
with a number of people expressing concern about the age of buses used for school
transport, many of which are very old.
Q5 - We will aim to work with Air Quality Champion Schools in each of our air
quality management areas, and other relevant areas looking at School Travel
Planning, relevant behaviour change campaigns and potential infrastructure
improvements to encourage sustainable travel to/from school for both pupils
and staff working in the school. 
Responses
Strongly agree 34% 77
Agree 34% 77
Neutral 16% 37
Disagree 6% 13
Strongly disagree 10% 23
Total 227
Over two thirds of respondents were in favour of this APM however comments made
confirmed that this would need buy-in from both schools and parents. It was also noted
that more alternatives to private car use and the appropriate supporting infrastructure
need to be looked at for school travel. Page 72 of 366

Page 73

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 41
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Q6 – We will conduct an audit of active travel infrastructure at North Lanarkshire
Council community hubs to encourage people to walk/wheel/cycle where
possible, instead of travelling by car.
Responses
Strongly agree 28% 64
Agree 31% 71
Neutral 16% 37
Disagree 8% 19
Strongly disagree 15% 35
Total 226
Over half of respondents agreed with this APM although a number of comments
submitted stated that they think there is a lack of the required infrastructure for
increasing rates of active travel.
Q7 - We will undertake publicity campaigns to encourage active travel to/from
these sites.
Strongly
disagree Disagree Neutral Agree
Strongly
agree Total
% Count % Count % Count % Count % Count
Responses 16% 38 8% 19 19% 45 33% 77 23% 54 233
16%
8%
19%
33%
23%
Strongly disagree Disagree Neutral Agree Strongly agree
Page 73 of 366

Page 74

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 42
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
While just over half agreed with this APM it is worthy to note that about a quarter of
respondents did not agree with this APM. Comments submitted reinforced this, with
responses indicating the money should be spent on infrastructure needs to be put in
place instead, and others questioning the worth of publicity campaigns.
Q8 - We will support home working and the use of hubs in addition to fixed work
locations to reduce workplace travel and unnecessary vehicle journeys.
Responses
Strongly agree 31% 71
Agree 32% 73
Neutral 15% 35
Disagree 5% 12
Strongly
disagree 17% 40
Total 231
Just under two thirds of respondents agreed with this APM, with under a quarter not
agreeing. Comments submitted were more in relation to the concept of home working
and associated aspects such as isolation. Interestingly, several respondents
suggested giving employees travel passes to use public transport to get to/from work
instead of pursuing the home working route. 
Page 74 of 366

Page 75

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 43
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Q9 – We will enhance the digital delivery of services to reduce the need for
employees and customers to travel to council buildings. 
Responses
Strongly agree 31% 74
Agree 30% 70
Neutral 19% 44
Disagree 7% 16
Strongly disagree 13% 31
Total 235
Respondents mostly agreed with this question however a number of comments were
made in relation to a significant amount of people not having access to digital services,
and also many people preferring to access services face to face and not online.
Q10 – We will:
Over half of respondents agreed with this APM however a quarter disagreed citing
concerns such as the lack of EV charging points and the disposal of EV batteries. Also
of concern was the financial aspect of providing these incentives to employees.
Page 75 of 366

Page 76

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 44
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Q11 – We will:
undertake the electrification of the NLC
fleet
increase EV charging points within council new-
build dev’s
Strongly agree 28% 68 41% 97
Agree 38% 91 32% 75
Neutral 15% 37 14% 32
Disagree 6% 14 4% 9
Strongly disagree 12% 29 10% 24
Total 239 237
While over two thirds of respondents agreed with these proposals there was a large
number of comments made in relation to the lack of EV charging points. Respondents
did not think this should be limited to NLC new build housing, but also EV provided at
existing NLC housing and existing NLC buildings.
Page 76 of 366

Page 77

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 45
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Q12 –
We will continue with the Eco Stars fleet
recognition scheme (or equivalent scheme)
An Eco Stars taxi operator scheme
will be set up in North Lanarkshire
We will promote the NLC Eco Stars
scheme to Council contractors and
endeavour to ensure they are
members
Strongly agree 23% 54 24% 57 22% 51
Agree 32% 76 30% 70 31% 73
Neutral 31% 74 29% 68 29% 68
Disagree 3% 7 6% 13 6% 13
Strongly
disagree 10% 24 12% 28 12% 29
Total 235 236 234
Around half of respondents agreed with the proposed APMs in relation to the Eco Stars
fleet and taxi schemes. There were slightly fewer open comments added for this
question however this may be due to a lack of knowledge about Eco Stars apart from
those already involved in the schemes.
Page 77 of 366

Page 78

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 46
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Q13 – We will continue to ensure that air quality is a material consideration:
Responses
Strongly agree 39% 89
Agree 34% 78
Neutral 14% 33
Disagree 3% 7
Strongly disagree 10% 22
Total 229
• in planning decisions
• revisions to the Local Development Plan
• included in the National Planning Framework
• in promoting best practice to realise air quality improvements
Almost three quarters of respondents support this proposed APM with only a minimal
number of open comments.
Q14 – We will continue to undertake joint working with neighbouring authorities
and other agencies on raising awareness. 
Responses
Strongly agree 35% 80
Agree 36% 84
Neutral 15% 34
Disagree 3% 8
Strongly
disagree 11% 25
Total 231
Again, there was a high level of support for this APM (71% agree or strongly agree).
In the open comments the issue of vehicle idling was raised. This is an area where
NLC already works with other local authorities. Resources were highlighted as an issue
by a few respondents.
11%
3%
15%
36%
35%
Strongly disagree
Disagree
Neutral
Agree
Strongly agree
We will continue to undertake joint working with neighbouring
authorities and other agencies on raising awareness of air
quality:
Page 78 of 366

Page 79

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 47
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Q15 - We will continue to work with the Enterprise Projects Team to ensure that
air quality is given appropriate consideration in City Deal projects and other
relevant active travel projects.
Responses
Strongly agree 34% 77
Agree 34% 77
Neutral 18% 42
Disagree 4% 9
Strongly
disagree 10% 24
Total 229
68% of respondents agreed or strongly agreed with this APM with only 14%
disagreeing. Comments made included that there should be more emphasis on
projects other than roads, such as active travel improvements, in City Deal Projects. 
Q16 – We will undertake a comprehensive review of air quality monitoring in
North Lanarkshire. This will consider the region-wide dispersion modelling
along with recent committed development and road infrastructure changes. It
will provide robust justification for monitoring types and locations through the
North Lanarkshire area. 
There was broad agreement on this proposal from respondents, with some open
comments citing concern about pollution from road traffic emissions and suggesting
there should be some community input into monitoring.
Q17 – Following the recommendation made in the review of the 2022 Annual
Progress Report the Air Quality Management Areas (AQMAs) at Chapelhall and
Coatbridge will be amended with the NO2 element revoked in each. Any other
AQMAs that would be deemed appropriate to revoke during the lifetime of this
Air Quality Action Plan will also be duly considered.
Respondents who commented did agree with this proposal however there were several
comments saying they were not able to comment on this measure.
Page 79 of 366

Page 80

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 48
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Consultation on Final Draft AQAP
Following the completion of the Final Draft AQAP this was subject to a final
consultation exercise and sent to all relevant stakeholders as well as the statutory
consultees defined in the Air Quality Policy Guidance PG(23). A summary of
response to the consultation on the Final Draft AQAP is provided in Table A.1
Table A.1:Summary of Responses to Consultation and Stakeholder
Engagement on the Final Draft AQAP
Consultee Category Response
Scottish Government Statutory Consultee Suggest inclusion of new WHO guideline values
SEPA Statutory Consultee
Suggest vehicle type source apportionment data included
– added in Appendix D
Transport Scotland Statutory Consultee No response
South Lanarkshire
Council
Statutory Consultee
(neighbouring authority) AQAP endorsed, no further comments
Glasgow City Council Statutory Consultee
(neighbouring authority) No response
Falkirk Council Statutory Consultee
(neighbouring authority) AQAP endorsed, no further comments
West Lothian Council Statutory Consultee
(neighbouring authority) AQAP endorsed, no further comments
East Dunbartonshire
Council
Statutory Consultee
(neighbouring authority) AQAP endorsed, no further comments
SPT Relevant stakeholder AQAP endorsed, no further comments
Sustrans Relevant Stakeholder AQAP endorsed, particular emphasis on Active Travel
Nature Scotland Relevant Stakeholder Response received via SEA process.
Lanarkshire Chamber of
Commerce Relevant Stakeholder No response
Historic Environment
Scotland Relevant Stakeholder AQAP endorsed, no further comments
NHS Lanarkshire Statutory Consultee No response
NLC Planning NLC Service Information on NPF 4 provided for inclusion in AQAP
Page 80 of 366

Page 81

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 49
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Consultee Category Response
NLC Roads NLC Service
Request input on potential infrastructure improvements
works and active travel pledges be clarified. Changes
made to reflect Roads response
NLC City Deal NLC Service Updated City Deal information provided
NLC Climate Change NLC Service Minor amendments suggested and incorporated
NLC Greenspace NLC Service No response
NLC Education NLC Service
Request key priority regarding AQ around schools include
commitment to focus on drop-off and pick-up times –
AQAP amended to include this
Public Health Scotland Relevant Stakeholder No response
Page 81 of 366

Page 82

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 50
OFFICIAL OFFICIAL
OFFICIAL OFFICIAL
Appendix B: Reasons for Not Pursuing Action Plan Measures
Table B.1:Action Plan Measures Not Pursued and the Reasons for that Decision.
Action category Action description Reason action is not being pursued (including Stakeholder views)
Promoting low emission transport Low Emission Zones (LEZ)
A screening assessment was undertaken to determine the effectiveness of a
LEZ for the North Lanarkshire AQMAs. The conclusion of this was that for the
journey types in the area a LEZ would not have the desired impact in reducing
traffic or air pollution levels
Transport Planning and Infrastructure Public cycle hire scheme Initial feasibility study was carried out however currently financial and staff
resources are not available to take this to the next stage
Page 82 of 366

Page 83

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 51
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Appendix C: Trend Graphs of Pollution Levels
within the AQMAs
Figures 1 to 6 below show the trend graphs of measured annual mean NO2
concentrations over the period 2018-2022 in the three AQMAs.
Figure 1: Annual Mean Concentrations of NO2 at CM1 Chapelhall
Figure 2: Annual Mean Concentrations of NO2 at CM4 Motherwell
Page 83 of 366

Page 84

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 52
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Figure 3: Annual Mean Concentrations of NO2 at CM3 Whifflet
Figure 4: Annual Mean Concentrations of NO2 at CM12 Whifflet A725
Page 84 of 366

Page 85

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 53
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Figure 5: Annual Mean Concentrations of NO2 at CM5 Shawhead Coatbridge
Figure 6: Annual Mean Concentrations of NO2 at CM6 Kirkshaws Coatbridge
Page 85 of 366

Page 86

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 54
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Figures 7 to 12 below show the trend graphs of measured annual mean PM10
concentrations over the period 2018-2022 in the three AQMAs. 
N.B. Monitoring Data of PM10 and PM2.5 has been adjusted in line with the Scottish
Government guidance issued May 2023 to adjust all PM data collected by Fidas 200
instruments to be using factors PM10 divided by 0.909 and PM2.5 multiplied by 1.06.
Figure 7: Annual Mean Concentrations of PM10 at CM1 Chapelhall
Figure 8: Annual Mean Concentrations of PM10 at CM4 Motherwell
0
5
10
15
20
2018 2019 2020 2021 2022Pollutant Concentrations µg/m
3
Year
CM1 Chapelhall- Annual Mean PM10
Annual Mean PM10 Monitoring Results (µg/m3) AQO
Page 86 of 366

Page 87

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 55
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Figure 9: Annual Mean Concentrations of PM10 at CM3 Whifflet
Figure 10: Annual Mean Concentrations of PM10 at CM12 Whifflet A725
Page 87 of 366

Page 88

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 56
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Figure 11: Annual Mean Concentrations of PM10 at CM5 Shawhead Coatbridge
Figure 12: Annual Mean Concentrations of PM10 at CM6 Kirkshaws Coatbridge
Page 88 of 366

Page 89

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 57
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Figures 13  to 18 below show the trend graphs of measured annual mean PM2.5
concentrations over the period 2018-2022 in the three AQMAs.
Figure 13: Annual Mean Concentrations of PM2.5 at CM1 Chapelhall
Figure 14: Annual Mean Concentrations of PM2.5 at CM4 Motherwell
Page 89 of 366

Page 90

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 58
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Figure 15: Annual Mean Concentrations of PM2.5 at CM3 Whifflet
Figure 16: Annual Mean Concentrations of PM10 at CM12 Whifflet A725
Page 90 of 366

Page 91

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 59
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Figure 17: Annual Mean Concentrations of PM2.5 at CM5 Shawhead Coatbridge
Figure 18: Annual Mean Concentrations of PM2.5 at CM6 Kirkshaws Coatbridge
Page 91 of 366

Page 92

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 60
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Appendix D: Summary of Source
Apportionment Analysis within AQMAs
The charts that follow show the results of a dispersion modelling study carried out in
2018 to calculate the contribution to baseline air quality from each source type at
several roadside locations within each AQMA.  The concentrations attributable to road
sources are then broken down into the contributions from each of the following vehicle
types:
• motorcycles
• cars
• LDVs
• Buses & Taxis
• HDVs
Page 92 of 366

Page 93

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 61
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Figure 19: Contribution to Annual Mean NOx Concentrations from Different
Source Types in Chapelhall
Figure 20: Contribution to Annual Mean NOx Concentrations from Different
Road Traffic Sources in Chapelhall- Site 1 Lauchope Street
Page 93 of 366

Page 94

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 62
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Figure 21: Contribution to Annual Mean NOx Concentrations from Different
Road Traffic Sources in Chapelhall- Site 2 A73 Main Street
Figure 22: Contribution to Annual Mean PM10 Concentrations from Different
Source Types in Chapelhall
Page 94 of 366

Page 95

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 63
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Figure 23: Contribution to Annual Mean PM10 Concentrations from Different
Road Traffic Sources in Chapelhall- Site 1 Lauchope Street
Figure 24: Contribution to Annual Mean PM10 Concentrations from Different
Road Traffic Sources in Chapelhall- Site 2 A73 Main Street
Page 95 of 366

Page 96

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 64
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Figure 25: Contribution to Annual Mean PM2.5 Concentrations from Different
Source Types in Chapelhall
Figure 26: Contribution to Annual Mean PM2.5 Concentrations from Different
Road Traffic Sources in Chapelhall- Site 1 Lauchope Street
Page 96 of 366

Page 97

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 65
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Figure 27: Contribution to Annual Mean PM2.5 Concentrations from Different
Road Traffic Sources in Chapelhall- Site 2 A73 Main Street
Figure 28: Contribution to Annual Mean NOx Concentrations from Different
Source Types in Motherwell
Page 97 of 366

Page 98

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 66
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Figure 29: Contribution to Annual Mean NOx Concentrations from Different
Road Traffic Sources in Motherwell – Site 3 Airbles Road
Figure 30: Contribution to Annual Mean NOx Concentrations from Different
Road Traffic Sources in Motherwell – Site 4 Windmillhill Street
Page 98 of 366

Page 99

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 67
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Figure 31: Contribution to Annual Mean NOx Concentrations from Different
Road Traffic Sources in Motherwell – Site 5 Hamilton Road 
Figure 32: Contribution to Annual Mean PM10 Concentrations from Different
Source Types in Motherwell
23.0%
0.0%
12.8%
17.3%
7.6%
% Contribution to Total Baseline (2017) NOx Concentration From
Different Road Vehicle Types: Site  5
Cars
Motorcycles
LGVs
Buses
HGVs
Page 99 of 366

Page 100

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 68
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Figure 32: Contribution to Annual Mean PM10 Concentrations from Different
Road Traffic Sources in Motherwell – Site 3 Airbles Road
Figure 33: Contribution to Annual Mean PM10 Concentrations from Different
Road Traffic Sources in Motherwell – Site 4 Windmillhill Street
Page 100 of 366

Page 101

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 69
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Figure 34: Contribution to Annual Mean PM10 Concentrations from Different
Road Traffic Sources in Motherwell – Site 5 Hamilton Road
Figure 35: Contribution to Annual Mean PM2.5 Concentrations from Different
Source Types in Motherwell
Page 101 of 366

Page 102

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 70
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Figure 36: Contribution to Annual Mean PM2.5 Concentrations from Different
Road Traffic Sources in Motherwell – Site 3 Airbles Road
Figure 37: Contribution to Annual Mean PM2.5 Concentrations from Different
Road Traffic Sources in Motherwell – Site 4 Windmillhill Street
Page 102 of 366

Page 103

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 71
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Figure 38: Contribution to Annual Mean PM2.5 Concentrations from Different
Road Traffic Sources in Motherwell – Site 5 Hamilton Road
Figure 39: Contribution to Annual Mean NOx Concentrations from Different
Source Types in Coatbridge
Page 103 of 366

Page 104

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 72
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Figure 40: Contribution to Annual Mean NOx Concentrations from Different
Road Traffic Sources in Coatbridge – Site 6 Whifflet Street
Figure 41: Contribution to Annual Mean NOx Concentrations from Different
Road Traffic Sources in Coatbridge – Site 7 Kirkshaws Road
Page 104 of 366

Page 105

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 73
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Figure 42: Contribution to Annual Mean NOx Concentrations from Different
Road Traffic Sources in Coatbridge – Site 8 Calder Street
Figure 43: Contribution to Annual Mean PM10 Concentrations from Different
Source Types in Coatbridge
Page 105 of 366

Page 106

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 74
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Figure 44: Contribution to Annual Mean PM10 Concentrations from Different
Road Traffic Sources in Coatbridge – Site 6 Whifflet Street
Figure 45: Contribution to Annual Mean PM10 Concentrations from Different
Road Traffic Sources in Coatbridge – Site 7 Kirkshaws Road
Page 106 of 366

Page 107

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 75
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Figure 46: Contribution to Annual Mean PM10 Concentrations from Different
Road Traffic Sources in Coatbridge – Site 8 Calder Street
Figure 47: Contribution to Annual Mean PM2.5 Concentrations from Different
Source Types in Coatbridge
Page 107 of 366

Page 108

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 76
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Figure 48: Contribution to Annual Mean PM2.5 Concentrations from Different
Road Traffic Sources in Coatbridge – Site 6 Whifflet Street
Figure 49: Contribution to Annual Mean PM2.5 Concentrations from Different
Road Traffic Sources in Coatbridge – Site 7 Kirkshaws Road
Page 108 of 366

Page 109

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 77
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Figure 50: Contribution to Annual Mean PM2.5 Concentrations from Different
Road Traffic Sources in Coatbridge – Site 8 Calder Street
Page 109 of 366

Page 110

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 78
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
Appendix E: Summary of Regional Modelling
Studies 2020-2022
North Lanarkshire Council commissioned external Consultancy ITPEnergised in 2018-
2020 to undertake a detailed dispersion modelling study and further assessment of air
quality within each of the AQMAs. The study included consideration of the modified M8
and A8 road layout between Shawhead and Newhouse and its effect on air quality in
the Coatbridge and Chapelhall AQMAs and adjoining roads. Consideration was also
given to the (then) proposed routes for Ravenscraig access infrastructure.
At the point of assessment in 2019 there was limited traffic data available for the new
M8/A8 road configuration. Transport Scotland and SEPA had commissioned further
traffic surveys which were ongoing at the time of the further assessment. It was agreed
that the dispersion modelling study would be updated and predicted pollutant
concentrations re-evaluated accordingly when data became available.
A Community Growth Area (CGA) has been allocated by NLC on the M73 corridor,
known as the Glenboig:Gartcosh CGA. This includes a strategy for significant
residential development which will have cumulative effects on local traffic flows, and
therefore local air quality, in the Gartcosh and Glenboig area and includes the Glenboig
Link Road which opened in June 2018. The requirement for an extension of the further
assessment study to include the M73 corridor from Bargeddie to Mollinsburn, including
allowance for the development proposals within the CGA, was therefore identified.
A number of large-scale developments, including major infrastructure developments
are proposed in North Lanarkshire over the next decade, as part of the Glasgow
Region City Deal funding. The main road developments are related to the Pan-
Lanarkshire Orbital Link Road (Pan-Lan) and projects along the A8/M8, which will have
particular influence on traffic movements and therefore air quality within the AQMAs. 
The regional modelling study was expanded in 2021-2022 to include the populated
area of Wishaw/Newmains where significant development sites are under
construction or have been allocated for future development in the local development
plan.  
Page 110 of 366

Page 111

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 79
OFFICIAL
OFFICIAL OFFICIAL
OFFICIAL
The area covered by the most recent study is shown in Figure 51: Regional
Modelling Study Area of Coverage included Explicitly Modelled Roads 2021-2022
The predicted annual mean concentrations for a baseline 2019 year, 2022 and a
future year of 2028 are shown for each pollutant in Figures 53 to 55.  The areas of
major infrastructure are shown with the AQMAs in Figure 56.  The City Deal projects
and the Pan-Lanarkshire Orbital Transport Corridor are shown in Figure 57.
The results of the regional modelling studies have assisted North Lanarkshire
Council to identify appropriate locations for additional coverage and/or deployment of
low-cost continuous monitoring sensors and locations where monitoring can be
discontinued due to many years of compliance with AQS objectives and a low risk of
public exposure.  This will make best use of resources while maintaining the
adequate coverage through the duration of this AQAP. 
The regional study results will also assist North Lanarkshire Council in the selection
of appropriate schools to include in APM 2b and to identify “hotspots” where APMs
could be prioritised such as targeting routes for low emission vehicle use in the
Council Fleet and liaising with bus operators to identify priority target routes for the
introduction of low/zero emission buses.
Page 111 of 366

Page 112

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 80
OFFICIAL OFFICIAL
OFFICIAL OFFICIAL
Figure 51: Regional Modelling Study Area of Coverage included Explicitly Modelled Roads 2021-2022
Page 112 of 366

Page 113

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 81
OFFICIAL OFFICIAL
OFFICIAL OFFICIAL
Figure 52:Predicted Annual Mean NO2 Concentration Across Study Area
Page 113 of 366

Page 114

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 82
OFFICIAL OFFICIAL
OFFICIAL OFFICIAL
Figure 53:Predicted Annual Mean PM10 Concentration Across Study Area
Page 114 of 366

Page 115

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 83
OFFICIAL OFFICIAL
OFFICIAL OFFICIAL
Figure 54:Predicted Annual Mean PM2.5 Concentration Across 7 Study Area
Page 115 of 366

Page 116

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 84
OFFICIAL OFFICIAL
OFFICIAL OFFICIAL
Figure 55:Areas of Major Infrastructure Projects in North Lanarkshire
Page 116 of 366

Page 117

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028
85
OFFICIAL OFFICIAL
OFFICIAL OFFICIAL
Figure 56: The Pan-Lanarkshire Orbital Transport Corridor
Page 117 of 366

Page 118

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 86
OFFICIAL OFFICIAL
OFFICIAL OFFICIAL
Glossary of Terms
Abbreviation Description
ATS Active Travel Strategy
AQAP
Air Quality Action Plan - A detailed description of measures,
outcomes, achievement dates and implementation methods,
showing how the local authority intends to achieve air quality limit
values’
AQMA
Air Quality Management Area – An area where air pollutant
concentrations exceed / are likely to exceed the relevant air
quality objectives. AQMAs are declared for specific pollutants
and objectives
APM Action Plan Measure
AQS Air Quality Strategy
APR Annual Progress Report
CAFS Cleaner Air for Scotland
EU European Union
LAQM Local Air Quality Management
LDP Local Development Plan
LTS Local Transport Strategy
NAQS National Air Quality Strategy
NO2 Nitrogen Dioxide
NOx Nitrogen Oxides
Page 118 of 366

Page 119

North Lanarkshire Council
North Lanarkshire Council Air Quality Action Plan 2023 - 2028 87
OFFICIAL OFFICIAL
OFFICIAL OFFICIAL
Abbreviation Description
PM10
Airborne particulate matter with an aerodynamic diameter of
10µm (micrometres or microns) or less
PM2.5
Airborne particulate matter with an aerodynamic diameter of
2.5µm or less
SEPA Scottish Environment Protection Agency
WHO World Health Organisation
Page 119 of 366

Page 120

North Lanarkshire Council
Annual Progress Report (APR)
2022 Air Quality Annual Progress Report (APR) for North Lanarkshire Council
In fulfilment of Part IV of the Environment Act 1995
Local Air Quality Management
August 2022
Appendix 2
Page 120 of 366

Page 121

North Lanarkshire Council 
Information North Lanarkshire Council 
Local Authority Officer Fiona Maguire
Department Regulatory Services and Waste Solutions
Address Civic Centre, Windmillhill Street,
Motherwell, ML1 1AB
Telephone 01236 856300
E-mail maguiref@northlan.gov.uk
Report Reference Number NorthLanAPR2022
Date August 2022
Page 121 of 366

Page 122

North Lanarkshire Council
LAQM Annual Progress Report 2022 iii
Executive Summary: Air Quality in Our Area
Air Quality in North Lanarkshire
North Lanarkshire Council is Scotland’s fourth largest (by population) local authority,
situated in Central Scotland. Traditionally an area associated with heavy industry, this has
significantly declined in recent years and the economy of the area now focuses on
commerce and light industry. Due to its geographical location many of Scotland’s trunk roads
pass through North Lanarkshire, including the M8/A8, M74, M73 and M80/A80. There is also
substantial cross-boundary travel with neighbouring local authority areas, particularly
Glasgow, South Lanarkshire, Falkirk and West Lothian, for employment, education and
leisure activities. The main source of air pollution within North Lanarkshire is road traffic
emissions, with a small element attributable to small-scale quarrying activities. 
North Lanarkshire Council operate an extensive network of air monitoring equipment
comprising ten real-time automatic monitoring stations measuring Nitrogen Dioxide (NO2)
and fine Particulate Matter (PM10 and PM2.5) as well as a comprehensive network of 81
passive diffusion tubes monitoring NO2. Our monitoring locations, both automatic and
diffusion tubes are reviewed on a regular basis to ensure we target the most appropriate
locations in terms of air pollution sources and the potential for receptor exposure. The
reporting period 2021 saw some changes in our automatic monitoring locations, with the
decommissioning of the Sunnyside Rd, Coatbridge and the Calder St, Whifflet sites. Two
new, more representative automatic sites were installed – at Whifflet Cross, A725 and also
at Ravenscraig. The Whifflet site is closer to the source of pollution in the area (road traffic
emissions) and receptors. The Ravenscraig site will serve to provide meaningful air
monitoring data as the site is developed over the coming years. New air monitoring
equipment was also purchased in 2021 using Scottish Government air quality grant funding,
one Particulate Analyser (FIDAS) and two Nitrogen Dioxide analysers installed in existing
sites to replace ageing equipment. In 2022 grant funding has been awarded to purchase
further Nitrogen Dioxide analysers to replace further existing equipment, and thus ensure
the highest integrity air monitoring data in North Lanarkshire.
In 2021 Scotland was in the second year of the Covid-19 pandemic and the level of road
traffic was significantly lower than in pre-pandemic years due to ongoing infection control
restrictions and work from home advice. All automatic and non-automatic (passive diffusion Page 122 of 366

Page 123

North Lanarkshire Council
LAQM Annual Progress Report 2022 iv
tube) monitoring of NO2, PM10 and PM2.5 indicated levels below the annual mean and short-
term statutory objectives. A slight increase on 2020 monitored levels was noted, but still
comfortably meeting the statutory objectives. It is highly likely that the reduced levels of road
traffic as a result of the Covid-19 pandemic is the reason for the reduced air pollution levels.
A key task in 2022 will be to compare both automatic and diffusion tube monitoring for 2021
with that of 2019 – the last representative year, prior to the Covid-19 pandemic. 
There are a number of major developments planned in the North Lanarkshire Council area
over the coming years. City Deal projects including the Pan Lan access to Ravenscraig
routes, and the East Airdrie Link Road, not to mention the NHS Lanarkshire New Monklands
Hospital and active travel improvements in Motherwell Town Centre. We will strive to ensure
air quality is considered at the earliest possible stage in both major and smaller scale
developments.
In line with the commitments within the Air Quality Action Plan North Lanarkshire Council
has continued to promote sustainable travel, in particular walking and cycling and have been
successful in obtaining Scottish Government air quality grant funding for a number of
initiatives over the past few years. In 2021 funding was obtained to contribute towards active
travel improvements in Motherwell Town Centre, close to Motherwell train station. In 2022
similar funding has been secured to contribute towards cycling infrastructure within
Strathclyde Park. We also worked alongside South Lanarkshire Council to promote walking
and cycling in and around Strathclyde Park using our bespoke “A Breath of Fresh Air in
Lanarkshire” map and APP. 
In 2022 the revocation of the Croy AQMA will be completed and the North Lanarkshire
Council’s Air Quality Action Plan will also be updated and published. This Action Plan will
bring together various council services whose functions impact on air quality to create a plan
to improve air quality in the North Lanarkshire Council area.
Actions to Improve Air Quality
2021 was the second year of the pandemic and various restrictions remained in place to
reduce the spread of infection. While this did impact the work of the Pollution Control and
Public Health Team at North Lanarkshire Council we are pleased to report that a number of
actions were still able to be progressed in terms of local air quality management work in
2021. Several projects were able to be realised in line with the pledges within the Council’s
Air Quality Action Plan. Page 123 of 366

Page 124

North Lanarkshire Council
LAQM Annual Progress Report 2022 v
In terms of air monitoring – using Scottish Government air quality grant funding the council
was able to purchase one new particulate analyser (FIDAS) and two new Nitrogen Dioxide
(NO2) analysers to upgrade equipment in two of our existing air monitoring stations. In
addition to this a low cost Zephyr air monitor was purchased for short-term air monitoring. 
Work also continued on the promotion of sustainable travel methods, particularly walking
and cycling, with funding from the air quality budget being provided for footpath share-use
works and signage in Motherwell town centre linking into wider active travel improvements
in the area. In a similar vein further work was carried out in conjunction with South
Lanarkshire Council to further promote the “A Breath of Fresh Air in Lanarkshire” walking
and Cycling map and APP for Strathclyde Park. This APP received a refresh and was
launched on Clean Air Day in 2021. 
The Eco Stars Fleet Recognition Scheme continued in 2021 and exceeded a total of 200
members. The planned Eco Stars bus operator workshop did not go ahead however, due to
the Covid-19 pandemic restrictions. 
Further information on actions taken to improve air quality in 2021 is detailed in Chapter 2
of the report.
Local Priorities and Challenges
In 2022/23 North Lanarkshire Council will continue to monitor air quality using our extensive
network of automatic and passive air monitors. Subject to Scottish Government air quality
grant funding and a robust procurement exercise further equipment will be purchased and
installed in existing air monitoring stations to ensure the highest standard of equipment, and
thus integrity of data that is possible. 
We will take due cognisance of air monitoring in 2022/23 as we go through the third year of
the Covid-19 pandemic and restrictions ease further. Comparisons will be made with 2019
(pre-pandemic) traffic levels and monitored levels of air pollutants in North Lanarkshire.
Particular attention will be paid to monitoring at the two new automatic air stations at Whifflet
A725, Coatbridge, and at Ravenscraig. 
The low-tech Zephyr air monitor purchase in 2021 will be deployed at a suitable location and
a further Zephyr purchased in 2022/23. 
Page 124 of 366

Page 125

North Lanarkshire Council
LAQM Annual Progress Report 2022 vi
The recently completed regional dispersion modelling exercise undertaken will be used to
undertake a comprehensive review of air quality monitoring locations in North Lanarkshire,
for both automatic and non-automatic equipment to ensure monitoring is carried out in the
most appropriate locations for both sources and potential receptor exposure. Further
upgrade of automatic air monitoring equipment will also take place, subject to Scottish
Government air quality grant funding.
The Eco Stars Fleet Recognition Scheme will continue to operate in North Lanarkshire in
2022 and a new, separate Eco Stars scheme for taxi operators will be established. Eco Stars
workshops will also be run in conjunction with South Lanarkshire Council, for bus and taxi
operators to encourage uptake in these sectors. 
A significant task for 2022 will be the update of the Council’s Air Quality Action Plan. This
Action Plan will be strongly linked with the Cleaner Air for Scotland Strategy document,
updated in 2021. Stakeholder events will be held to ensure input from all relevant service
areas and to highlight the necessity of inter-departmental working in air quality action
planning. 
The revocation of the Croy Air Quality Management Area (AQMA) will also be completed in
2022. 
We will also continue to promote and link in with sustainable travel initiatives within the
Council where possible, recognising its importance in improving local air quality. In recent
years we have been successful in obtaining air quality funding to contribute towards
elements of larger projects. For 2022 we have obtained funding for footpath, access and
signage work at Strathclyde Park to improve access for new cycling infrastructure that is
being installed. We will also continue to work with South Lanarkshire Council to encourage
greater levels of walking and cycling through our “A Breath of Fresh Air in Lanarkshire
walking and cycling map/APP. Where possible we will strive to continue promotion and
expansion of this resource.
How to Get Involved
Further information on air quality in North Lanarkshire can be found on the Council’s website
at http://www.northlanarkshire.gov.uk/pests-and-pollution/pollution/air-pollution or by
contacting kildonanPS@northlan.gov.uk 
Page 125 of 366

Page 126

North Lanarkshire Council
LAQM Annual Progress Report 2022 vii
Table of Contents
Executive Summary: Air Quality in Our Area ................................................................. iii
Air Quality in North Lanarkshire  ..................................................................................................iii
Actions to Improve Air Quality .................................................................................................... iv
Local Priorities and Challenges ................................................................................................... v
How to Get Involved ................................................................................................................... vi
1 Local Air Quality Management ................................................................................... 1
2 Actions to Improve Air Quality ................................................................................... 2
2.1 Air Quality Management Areas ......................................................................................... 2
2.2 Cleaner Air for Scotland 2 ................................................................................................. 3 
Placemaking – Plans and Policies ............................................................................................. 3 
Transport – Low Emission Zones .............................................................................................. 4 
Air Quality and Climate Change ................................................................................................ 4
2.3 Progress and Impacts of Measures to address Air Quality in North Lanarkshire ............... 5
3 Air Quality Monitoring Data and Comparison with Air Quality Objectives .......... 16
3.1 Summary of Monitoring Undertaken ................................................................................ 16 
Automatic Monitoring Sites ...................................................................................................... 16 
Non-Automatic Monitoring Sites .............................................................................................. 16 
Other Monitoring Activities ....................................................................................................... 17
3.2 Individual Pollutants ........................................................................................................ 17 
Nitrogen Dioxide (NO2) ............................................................................................................ 17 
Particulate Matter (PM10) ......................................................................................................... 18 
Particulate Matter (PM2.5) ......................................................................................................... 19 
Sulphur Dioxide (SO2).............................................................................................................. 20 
Carbon Monoxide, Lead and 1,3-Butadiene ............................................................................ 20
4 New Local Developments ......................................................................................... 21
4.1 Road Traffic Sources ...................................................................................................... 21
4.2 Other Transport Sources ................................................................................................ 25
4.3 Industrial Sources ........................................................................................................... 25
Page 126 of 366

Page 127

North Lanarkshire Council
LAQM Annual Progress Report 2022 viii
4.4 Commercial and Domestic Sources ................................................................................ 26
4.5 New Developments with Fugitive or Uncontrolled Sources ............................................. 27
5 Planning Applications ............................................................................................... 28
6 Conclusions and Proposed Actions ........................................................................ 31
6.1 Conclusions from New Monitoring Data .......................................................................... 31
6.2 Conclusions relating to New Local Developments ........................................................... 32
6.3 Proposed Actions ............................................................................................................ 33
Appendix A: Monitoring Results .................................................................................... 34
Appendix B: Full Monthly Diffusion Tube Results for 2021 ......................................... 56
Appendix C: Supporting Technical Information / Air Quality Monitoring Data QA/QC
........................................................................................................................................... 59
New or Changed Sources Identified Within North Lanarkshire During 2021 .............................. 59
Additional Air Quality Works Undertaken by North Lanarkshire Council During 2021 ................ 59
QA/QC of Diffusion Tube Monitoring ......................................................................................... 59
Diffusion Tube Annualisation ................................................................................................................... 60
Diffusion Tube Bias Adjustment Factors ................................................................................................. 61
NO2 Fall-off with Distance from the Road ................................................................................................ 61
QA/QC of Automatic Monitoring ................................................................................................ 62
PM10 and PM2.5 Monitoring Adjustment ................................................................................................... 62
Automatic Monitoring Annualisation ........................................................................................................ 63
NO2 Fall-off with Distance from the Road ................................................................................................ 63
Glossary of Terms ........................................................................................................... 65
References ....................................................................................................................... 66  
Page 127 of 366

Page 128

North Lanarkshire Council
LAQM Annual Progress Report 2022 ix
List of Tables
Table 1.1 – Summary of Air Quality Objectives in Scotland ................................................. 1
Table 2.1 – Declared Air Quality Management Areas .......................................................... 2
Table 2.2 – Progress on Measures to Improve Air Quality................................................... 8
Table 5.1 – Relevant Planning Application from 2021……………………………………..…28
Table A.1 – Details of Automatic Monitoring Sites ............................................................. 34
Table A.2 – Details of Non-Automatic Monitoring Sites ..................................................... 36
Table A.3 – Annual Mean NO2 Monitoring Results (µg/m3) ............................................... 44
Table A.4 – 1-Hour Mean NO2 Monitoring Results, Number of 1-Hour Means > 200µg/m3
........................................................................................................................................... 52
Table A.5 – Annual Mean PM10 Monitoring Results (µg/m3) .............................................. 53
Table A.6 – 24-Hour Mean PM10 Monitoring Results, Number of PM10 24-Hour Means >
50µg/m3 ............................................................................................................................. 54
Table A.7 – Annual Mean PM2.5 Monitoring Results (µg/m3) ............................................. 55
Table B.1 – NO2 2021 Monthly Diffusion Tube Results (µg/m3) ......................................... 56
Table C.1 – Bias Adjustment Factor .................................................................................. 64
Table C.2 – Annualisation Summary (concentrations presented in µg/m3) for PDT sites
DT144, DT145 and DT146 ................................................... Error! Bookmark not defined. 
List of Figures
Figure C.1 – Glasgow Scientific Services – National Average Bias Adjustment Factor
Spreadsheet 06/22
Page 128 of 366

Page 129

North Lanarkshire Council
LAQM Annual Progress Report 2022 1
1 Local Air Quality Management
This report provides an overview of air quality in North Lanarkshire Council during 2021. It
fulfils the requirements of Local Air Quality Management (LAQM) as set out in Part IV of the
Environment Act (1995) and the relevant Policy and Technical Guidance documents. 
The LAQM process places an obligation on all local authorities to regularly review and
assess air quality in their areas, and to determine whether or not the air quality objectives
are likely to be achieved. Where an exceedance is considered likely the local authority must
declare an Air Quality Management Area (AQMA) and prepare an Air Quality Action Plan
(AQAP) setting out the measures it intends to put in place in pursuit of the objectives. This
Annual Progress Report (APR) summarises the work being undertaken by North
Lanarkshire Council to improve air quality and any progress that has been made.
Table 1.1 – Summary of Air Quality Objectives in Scotland
Pollutant Air Quality Objective
Concentration
Air Quality
Objective
Measured as
Date to be
Achieved
by
Nitrogen
dioxide (NO2)
200 µg/m3 not to be exceeded
more than 18 times a year 1-hour mean 31.12.2005
Nitrogen
dioxide (NO2) 40 µg/m3 Annual mean 31.12.2005
Particulate
Matter (PM10)
50 µg/m3, not to be exceeded
more than 7 times a year 24-hour mean 31.12.2010
Particulate
Matter (PM10) 18 µg/m3 Annual mean 31.12.2010
Particulate
Matter (PM2.5) 10 µg/m3 Annual mean 31.12.2021
Sulphur
dioxide (SO2)
350 µg/m3, not to be exceeded
more than 24 times a year 1-hour mean 31.12.2004
Sulphur
dioxide (SO2)
125 µg/m3, not to be exceeded
more than 3 times a year 24-hour mean 31.12.2004
Sulphur
dioxide (SO2)
266 µg/m3, not to be exceeded
more than 35 times a year 15-minute mean 31.12.2005
Benzene 3.25 µg/m3 Running annual
mean 31.12.2010
1,3 Butadiene 2.25 µg/m3 Running annual
mean 31.12.2003
Carbon
Monoxide 10.0 mg/m3 Running 8-Hour
mean 31.12.2003  
Page 129 of 366

Page 130

North Lanarkshire Council
LAQM Annual Progress Report 2022 2
2 Actions to Improve Air Quality
Air Quality Management Areas
Air Quality Management Areas (AQMAs) are declared when there is an exceedance or likely
exceedance of an air quality objective. After declaration, the authority must prepare an Air
Quality Action Plan (AQAP) within 12 months, setting out measures it intends to put in place
in pursuit of the objectives.
A summary of AQMAs declared by North Lanarkshire Council can be found in Table 2.1.
Further information related to declared or revoked AQMAs, including maps of AQMA
boundaries are available online at https://www.northlanarkshire.gov.uk/pests-and-
pollution/pollution/air-quality/air-quality-management-areas
In 2021, following approval from the Scottish Government and SEPA, North Lanarkshire
Council began the formal process of revoking the Croy Air Quality Management Area
(AQMA). The revocation process was completed in 2022.
Table 2.1 – Declared Air Quality Management Areas
AQMA
Name
Pollutants
and Air
Quality
Objectives
City / Town Description Action Plan
AQMA
Chapelhall
NO2 annual
mean
PM10 annual
mean
Chapelhall
An area encompassing a
number of properties at the
junction of Main Street and
Lauchope Street
http://www.northlanarks
hire.gov.uk/pests-and-
pollution/pollution/air-
quality/air-quality-
management-areas 
AQMA
Coatbridge
NO2 annual
mean
PM10 annual
mean
Coatbridge
Whifflet Street stretching from
roundabout at McDonalds to
Shawhead roundabout.
Extended in 2015 to include
Kirkshaws Road
http://www.northlanarks
hire.gov.uk/pests-and-
pollution/air-quality/air-
quality-management-
areas 
AQMA
Motherwell
PM10 annual
mean Motherwell
An area encompassing part of
Motherwell Town Centre 
http://www.northlanarks
hire.gov.uk/pests-and-
pollution/pollution/air-
quality/air-quality-
management-areas 
Page 130 of 366

Page 131

North Lanarkshire Council
LAQM Annual Progress Report 2022 3
Cleaner Air for Scotland 2
Cleaner Air for Scotland 2 – Towards a Better Place for Everyone (CAFS2) is Scotland’s
second air quality strategy. CAFS2 sets out how the Scottish Government and its partner
organisations propose to further reduce air pollution to protect human health and fulfil
Scotland’s legal responsibilities over the period 2021 – 2026. CAFS2 was published in July
2021 and replaces Cleaner Air for Scotland – The Road to a Healthier Future (CAFS), which
was published in 2015. CAFS2 aims to achieve the ambitious vision for Scotland "to have
the best air quality in Europe". A series of actions across a range of policy areas are outlined,
a summary of which is available on the Scottish Government’s website. 
Progress by North Lanarkshire Council against relevant actions for which local authorities
are the lead delivery bodies within this strategy is demonstrated below.  
Placemaking – Plans and Policies
Local authorities with support from the Scottish Government will assess how effectively air
quality is embedded in plans, policies, City Deals and other initiatives, and more generally
in cross departmental working, identifying and addressing evidence, skills, awareness and
operational gaps. 
North Lanarkshire Council submitted its draft Local Development Plan (LDP) to the Scottish
Government for appraisal and has recently been granted approval that the Draft LDP can
be formally adopted. The Draft LDP includes a section on Placemaking Policies which
details Environment and Design Qualities (EDQ) for development. Category EDQ C2
includes air quality as a Special Feature for Consideration for proposed development.
In addition, within the EDQ3 Policy section of the Draft LDP there is reference to air quality
as one of a number of considerations in relation to planned development. Particular note is
made of proposed development within or adjacent to Air Quality Management Areas.
North Lanarkshire Council Pollution Control and Public Health Team are consulted by
Development Control on any proposed developments that could potentially impact on air
quality. Where deemed necessary an Air Quality Impact Assessment is requested in respect
of the proposed development and thereafter reviewed before a response is made back to
Planning to be included in their overall assessment of the planning application. This includes
major infrastructure projects such as the City Deal projects. If appropriate pre-application
discussions in respect of air quality will take place in respect of major development projects.  Page 131 of 366

Page 132

North Lanarkshire Council
LAQM Annual Progress Report 2022 4  
Transport – Low Emission Zones
Local authorities working with Transport Scotland and SEPA will look at opportunities to
promote zero-carbon city centres within the existing LEZs structure.
North Lanarkshire Council has no Low Emission Zones and following a screening exercise
has concluded that there are no areas where Low Emission Zones would be appropriate at
this time. 
Air Quality and Climate Change
The Climate Plan Act 2030 is the first in a series of documents which will form the climate
strategy for North Lanarkshire. The council declared a climate emergency and committed
itself and the area of North Lanarkshire to an accelerated target of net-zero greenhouse
gas emissions by 2030, beyond the ambition of the Climate Change (Emission Reduction
Targets)(Scotland) Act 2019. This has required a new approach to the council’s own
emission reductions as well as recognising the need for an area-based strategic approach
to incorporate the full intent of the Climate Change (Scotland) Act 2009 [as amended].
Targeting transport emissions is key to the delivery of this ambitious target as within the
North Lanarkshire area road emissions account for 36.3% of total local greenhouse
gas emissions. Work is progressing in its development and is supported by current and
future planned activity: 
• The future workplace model has witnessed a transition for staff who were
designated as home workers during COVID-19 restrictions to that of hybrid,
requiring full time staff to work from the office a minimum of 6 days per month. This
change will see an increase in commuting however will not revert back to the same
level as pre-March 2020. Staff continue to be supported by the increased capacity
and reliability of connections and digital technology at their workplace and home.
This capability facilitates opportunities to reduce transport emissions and non-
essential travel as meetings can be hosted via Microsoft Teams. 
• Pool vehicles are now distributed to services as per demand. The use of pool
vehicles continues to be encouraged in line with the council’s business travel policy. 
• The council has entered into a strategic partnership for electric vehicle charging
infrastructure with Transport Scotland, Scottish Power Energy Networks and South Page 132 of 366

Page 133

North Lanarkshire Council
LAQM Annual Progress Report 2022 5
Lanarkshire Council. Project Pace installed community electric vehicle charging
stations at 44 locations. Other than improving the vehicle charging provision, the
council has no direct influence on consumer behaviour however a commitment has
been made to increasing its Low Emission fleet and so are visibly supporting this
agenda.
Progress and Impacts of Measures to address Air Quality in
North Lanarkshire Council
North Lanarkshire Council has taken forward a number of measures during the current
reporting year of 2021 in pursuit of improving local air quality. Details of all measures
completed, in progress or planned are set out in Table 2.2. More detail on these measures
can be found in the air quality Action Plan relating to each AQMA. Key completed measures
are: 
• Consultation process undertaken on revocation of Croy AQMA
• Purchased new monitoring equipment – two new NOx analysers, one particulate
analyser (FIDAS) and a low-cost Zephyr air monitor
• Decommissioned two air monitoring stations and set up two new stations in areas of
more relevant exposure
• Updated all AQ pages on NLC website – the North Lanarkshire Council website was
upgraded in 2021 and all pages relating to air pollution were updated
• Expanded Dispersion modelling study – the original dispersion modelling study was
expanded in 2021 to include the Wishaw and Newmains areas in order to get a
picture of modelled air pollution levels across the area. 
• Funding awarded from the Scottish Government Air Quality Action Plan grant
contributed towards the larger Motherwell Station Active Travel Links Project.
Specifically this funding paid for widening and resurfacing a section of path alongside
the Aquatec in Motherwell town centre for shared use and the installation of new
shared use signage. This section of path will link into wider active travel
improvements between Motherwell rail station, Motherwell town centre and
Strathclyde Country Park.  
Progress on the following measures has been slower than expected due to: 
Page 133 of 366

Page 134

North Lanarkshire Council
LAQM Annual Progress Report 2022 6
• The revocation of Croy AQMA did not progress as quickly as expected due to
competing operational pressures as a result of the Covid-19 pandemic. This work will
be completed in 2022
• The planned Eco Stars bus operator workshop that was being held in conjunction
with South Lanarkshire Council did not go ahead because of the Covid-19 pandemic. 
• No air quality work with schools was able to take place during 2021 due to access to
schools being restricted because of the Covid-19 pandemic.
North Lanarkshire Council expects the following measures to be completed over the course
of the next reporting year:
• One of the main pieces of work in 2022 will be the update of the Council’s Air Quality
Action Plan. 
• Following the necessary consultation exercise the process of revoking the Croy
AQMA will be completed. 
• Subject to funding and following a robust procurement process the council intend to
purchase up to eight NOx air monitors to replace ageing monitoring equipment in
some of our existing air stations
• Following on from initiatives in recent years around cycling and walking in Strathclyde
Park in 2022 we have been successful in obtaining Scottish Government air quality
funding to contribute to a wider project involving the improvement of the cycling
infrastructure at Strathclyde Park. Specifically for this year we are supporting footpath
widening, signage etc. changes to link new cycling infrastructure in the north of
Strathclyde Park with the existing cycle hire facilities at the Watersports Centre. This
will have the benefit of improving access to cycling and promoting cycling as a
preferred sustainable transport option rather than private vehicle use.
• Following on from the previous Strathclyde Park map/APP “A Breath of Fresh Air in
Lanarkshire” project with South Lanarkshire Council. A new Treasure Trail route will
be developed and added to the APP. This will be launched in the school summer
holidays in 2022
• In 2022 we will undertake an extension of the regional air quality dispersion model to
cover the whole remainder of the North Lanarkshire area. This would include the
above Northern part of the district, and also the east of the district (Shotts, Harthill
etc).  
Page 134 of 366

Page 135

North Lanarkshire Council
LAQM Annual Progress Report 2022 7
• A comprehensive review of North Lanarkshire Council’s air monitoring equipment will
be undertaken taking due cognisance of the dispersion modelling studies we have
had carried out over the past couple of years. This will ensure that all monitoring,
both automatic and non-automatic (passive diffusion tubes) will be sited in
appropriate locations having regard to likely (modelled) levels and relevant receptor
exposure.
• The Eco Stars Fleet Recognition Scheme will continue to run in 2022 with fleet
operators in North Lanarkshire. In addition to the fleet scheme in 2022 a separate
Eco Stars scheme for taxi operators will be launched.  We also hope to run two Eco
Stars workshops, in conjunction with South Lanarkshire Council, in 2022. One will be
for bus operators and one for taxi operators. 
Page 135 of 366

Page 136

North Lanarkshire Council
LAQM Annual Progress Report 2022 8
Table 2.2 – Progress on Measures to Improve Air Quality
Me
asu
re
No.
Measure Category Focus Lead
Authority
Plann
ing
Phas
e
Imple
ment
ation
Phas
e
Key
Perf
orm
anc
e
Indi
cat
or
Target
Pollution
Reduction in
the AQMA
Progr
ess
to
Date
Estim
ated
Com
pletio
n
Date
Comments
1
NLC Vehicle Fleet and Work Journeys 
• The Council will strive to reduce car
journey for work purposes eg by
teleconferencing. For instances
where work travel is necessary the
Council’s car fleet will be utilised with
electric/hybrid vehicles provided
where possible. 
• Further consideration will be given to
reducing the number of private
vehicles used for Council business,
introducing bus/sustainable
transport where possible
Promoting
Travel
Alternative
s
Workplac
e Travel
Planning
NLC All
Depts
2018/
19
2019-
2021 NA
Anticipated
reduction in
concentration,
based on the
result of
quantitative
appraisal
(using
dispersion
modelling
and/or
screening
tools)
Ongoi
ng
Ongoi
ng
Since the start of the
Covid-19 pandemic
there has been a
reduction in use of pool
cars due to home
working and buildings,
and issues surrounding
the sanitisation of
vehicles between uses. 
Working from home
and remote meetings
have meant a
reduction in work-
associated travel. 
Pool cars are now the
responsibility of
individual services
within the council, and
not operated centrally
via Fleet and
Transport. This is as a
result of less demand
for pool cars in the
post-covid landscape.
2
Vehicle Fleet Efficiency 
• Tracking devices will continue to be
fitted to NLC fleet vehicles in order to
provide info on managing
idling/speeding and unnecessary
journeys 
Vehicle
Fleet/Effici
ency/Traffi
c
Manageme
nt 
Driver
training
and Eco
driving
aids
NLC Fleet
and
Transport
2018 2018-
2021 NA
Anticipated
reduction in
NLC vehicle
fleet
contributions
to poor air
quality
Comp
lete
Comp
lete
In 2021 tracking
devices were fitted on
308 fleet vehicles.
Following a
procurement exercise
in 2022 this figure is
expected to rise to 600
which will be all of the Page 136 of 366

Page 137

North Lanarkshire Council
LAQM Annual Progress Report 2022 9
• Driver Certificate of Professional
Competence training will be
provided for all Council drivers,
including modules on safe and
efficient driving 
• The Council will introduce
scheduling of Council vehicles eg by
coordinating school
bus/minibus/community transport
vehicles 
NLC fleet with tracking
systems. 
Driver CPC training is
ongoing for all NLC
driving staff 
2021-Optimal routing
of NLC buses on hold
due to pandemic
however waste still use
Fleetroute to manage
their street routing and
the efficiency of
vehicles. It is hoped to
introduce the use of
Fleetroute for NLC
buses. 
3
Subject to Scottish Govt grant funding the
Council will continue to operate the NLC Eco
Stars fleet recognition scheme and use this
to engage with certain vehicle sectors on
route planning as appropriate to avoid
AQMAs
Vehicle
Fleet
Efficiency
Fleet
Efficiency
and
recogniti
on
schemes
NLC
Protective
Services
and
external
consultant
delivering
Eco Stars
2018 2018-
2021 NA
Targeted
reduction of
certain vehicle
sectors in
AQMAs
leading to
reduced
emission in
AQMAs
Ongoi
ng
Ongoi
ng
The North Lanarkshire
Council Eco Stars fleet
recognition scheme
continued in 2021
4
The Council will continue to increase the
provision of electric vehicle (EV) charging
points, where possible ensuring that they are
accessible to both NLC staff and the general
public. The Council will engage with other
public sector agencies (eg NHS Lanarkshire)
to encourage similar provision to ensure
adequate coverage of EV charging points
across NLC area
Promoting
low
emission
transport
Promotio
n of EV
charging
NLC/other
public
bodies in
the area
2018-
2021
2018-
2021 NA
Greater
facilities for EV
should
encourage
uptake,
reducing
vehicle
emission in
AQMAs
Ongoi
ng
Ongoi
ng
A further 40 EV
charging points have
been installed in NLC
premises in 2021/22
5
The Council will abide by their statutory duty
of sustainable procurement and sustainable
section of the sourcing methodology
documentation, which will consequently feed
through into the specification/award criteria
where appropriate
Promoting
low
emission
transport
Public
vehicle
procurem
ent –
prioritisin
g uptake
of low
NLC
Procureme
nt
2018-
19
2018
–
2021
NA NA In
place
Ongoi
ng
Procurement Strategy
document includes info
on sustainable
procurement
Page 137 of 366

Page 138

North Lanarkshire Council
LAQM Annual Progress Report 2022 10
emission
transport
6
Increasing levels of sustainable travel 
• The Council will work with agencies
such as SPT and Sustrans (among
others) to develop and implement
measures which will encourage
modal shift to public transport and
active travel 
• A programme of awareness raising
and promotion initiatives will be
progressed around walking and
cycling in North Lanarkshire. This
will incorporate information on routes
to key destinations in the NLC area
Promoting
travel
alternative
s
Intensive
active
travel
campaig
n and
infrastruc
ture
NLC
Protective
Services,
Roads,
City Deal,
external
organisatio
ns on
behalf of
NLC
2018/
19
2018-
2021 NA Unknown Ongoi
ng
Ongoi
ng
The North Lanarkshire
Council Active Travel
Strategy was approved
by the Council’s
Environment and
Transportation
Committee in August
2021. 
Currently the Council is
working through the
Active Travel strategy
to prioritise future
projects
7
The Council will engage with SPT and other
relevant local authorities to develop common
engine standards for all tendered school bus
contracts
Promoting
sustainable
travel
Public
vehicle
procurem
ent-
promotin
g uptake
of low
emission
vehicles
NLC, SLC,
other
neighbouri
ng
authorities
2018 2018-
2021 NA
Improved
emissions
from buses
travelling in
AQMAs should
improve
overall AQ in
AQMAs
Initial
meeti
ng
held
with
SPT
in
early
2020,
just
prior
to
start
of
pand
emic
Ongoi
ng
No progress on this in
2021 due to the Covid-
19 pandemic
8
The Council will continue to progress their
Workplace Travel Plan especially in view of
other relevant NLC policies, such as property
rationalisation, home working policy etc. 
Promoting
sustainable
travel
Workplac
e travel
planning
NLC, all
services
2018-
2021 2019 NA Unknown
Work
starte
d
2018/
19. 
Ongoi
ng
A consultant was
engaged in 2018/19 to
undertake a Workplace
Travel Survey.
Because of the Covid-
19 pandemic this WTS
will require to be
updated to reflect
changed working
practices once the
pandemic is over. No
further action was
taken on this in 2021. Page 138 of 366

Page 139

North Lanarkshire Council
LAQM Annual Progress Report 2022 11
9
The Council will continue to run and publicise
Vehicle Emission Testing and Vehicle Idling
Enforcement campaigns in areas of known
and suspected persistent idling.
Traffic
manageme
nt
Anti-
idling
enforcem
ent
/testing
vehicle
emission
s
NLC
Protective
Services
2018/
19
2018-
2021 NA Unknown Ongoi
ng
Ongoi
ng
Vehicle Emission
Testing and Vehicle
Idling Enforcement
continued in 2021
where possible 
10
The Council will introduce car parking on-
street enforcement in town centres in North
Lanarkshire in order to reduce inappropriate
parking in town centres and other areas
Traffic
manageme
nt
Parking
enforcem
ent
NLC  2018 2018-
19 NA
Unknown, but
aim is to be a
deterrent to
driving in town
centres
Comp
leted
and
ongoi
ng
Comp
leted
and
ongoi
ng
Parking enforcement
team is now fully
staffed and operational
in North Lanarkshire
11
The Council will investigate options for
improving bus service provision in North
Lanarkshire
• Encourage partnership with SPT and
bus operators to ensure major
developments are fully connected
from the outset
• Investigate/implement better bus
infrastructure, particularly bus
priority measures to ensure greater
uptake of bus travel and reduce
emissions from buses, helping
congestion
• Work with bus operators (eg via Eco
Stars) to improve emission
standards for buses operating in
North Lanarkshire and particularly
within AQMAs
Transport
planning
and
infrastructu
re 
Traffic
manageme
nt 
Vehicle
Fleet
Efficiency
Bus route
improve
ment 
Bus
priority 
Promotin
g low
emission
transport
NLC 
SPT
2018-
2021
2019-
2021 NA
Anticipated
reduction in
emissions
Ongoi
ngv
and
compl
ete
Ongoi
ng
and
compl
ete
Roads and
Transportation have
designed bus
infrastructure
improvements on bus
corridor.
The contractor is
anticipated to
commence works in
Autumn 2022
12
Fully support and input to where possible the
planned Strategic Travel Hub for Motherwell,
ensuring project objectives include air quality
indicators. Part of this will include taking
forward the findings of the Motherwell Cycle
Hire Feasibility Study recently undertaken for
the town.
Transport
planning
and
infrastructu
re
Public
transport
improve
ment-
interchan
ges,
stations
and
services.
Also
public
cycle hire
schemes
NLC 
City Deal
2018-
2021
2019-
2021 NA
Anticipated
reduction in
emissions in
Motherwell
through modal
shift and
greater options
for sustainable
travel
Ongoi
ng,
long
term
initiati
ve
Ongoi
ng,
long
term
initiati
ve
In 2021 Scottish
Government air quality
funding enabled works
involved widening and
resurfacing a section of
path alongside the
Aquatec in Motherwell
town centre for shared
use and installation of
new shared use
signage. This section
of path will link into
wider active travel link
Page 139 of 366

Page 140

North Lanarkshire Council
LAQM Annual Progress Report 2022 12
improvements between
Motherwell Rail
Station, Motherwell
town centre and
Strathclyde Country
Park, which are being
design at present. This
is to complement the
Strategic Travel Hub
proposed for
Motherwell. 
13
The Council will investigate all potential
options for the improvement of traffic flow, and
therefore air quality, through the Chapelhall
AQMA
Transport
planning
and
infrastructu
re
Traffic
manage
ment
NLC
Roads 2019 2020 NA
Anticipated
reduction in
traffic and
therefore
emissions in
Chapelhall
Comp
lete
Comp
lete
Works to install speed
tables in Chapelhall
were completed in
March 2022. Post-
implementation traffic
surveys will be
undertaken in Spring
2023
14
The Council will ensure that air quality issues
are duly considered for proposed major
infrastructure projects which have the
potential to impact on the Council’s AQMAs
Policy
guidance
and
developme
nt control
Air
Quality
planning
and
policy
guidance
NLC
Planning
and Place
2018 2019-
2021 NA Unknown Ongoi
ng
Ongoi
ng
In 2021 North
Lanarkshire Council
has continued to
ensure that air quality
is appropriately
considered in all
proposed major
infrastructure projects.
Air quality continues to
be recognised as a
significant factor when
assessing City Deal
major road
infrastructure projects.
15
The Council will ensure that all policies in
relation to the Public Sector Climate Change
responsibilities will take due cognisance of air
quality implications as appropriate,
particularly where there is potential for
adverse air quality impacts.
Policy
guidance
and
developme
nt control
Other
policy NLC 2018 2018-
2021 NA Unknown In
place
Ongoi
ng
See update in section
2.1.3 of report
16 The Council will continue to ensure that air
quality is appropriately considered in all
Policy
guidance
Air
quality
NLC
planning 2018 2018-
2021 NA Unknown In
place
Ongoi
ng
In 2021 the council has
continued to ensure Page 140 of 366

Page 141

North Lanarkshire Council
LAQM Annual Progress Report 2022 13
relevant planning applications and ensure that
planning decisions and policy at both strategic
and local level will take due cognisance of the
Cleaner Air For Scotland (CAFS) Strategy
and the Council’s Air Quality Action Plan
and
developme
nt control
planning
and
policy
guidance
that air quality is
appropriately
considered in all
relevant planning
applications and policy
17
The Council will endeavour to ensure the
highest quality of air monitoring data is
produced in order to provide robust evidence
for air quality decision-making. Specifically:-
• A revie, including a GIS-mapping
exercise will be undertaken of all
NLC-operated air quality monitoring
sites (automatic and non-automatic)
to ensure that monitoring is being
carried out at the most appropriate
locations. In terms of receptor
exposure and sources of air
pollution. 
• The automatic air monitoring unit at
Civic Centre, Motherwell, will be
relocated to a more representative
location which will enable a
comparison of air quality before and
after the planned road infrastructure
changes and other major
developments in the area.
• In line with new statutory
requirements the council will set up
a monitoring network for PM2.5 
• An updated dispersion modelling
exercise will be undertaken of the
A73, Monklands and Motherwell
area in order to obtain an accurate
picture of air quality levels in North
Lanarkshire
Public
information
Awarene
ss raising
NLC
Protective
Services
2018 2019 NA NA Comp
lete
Comp
lete
In 2021 the following
projects were
completed:- 
The Calder Street,
Whifflet air monitoring
station was moved to
Whifflet St, A725,
which is a more
representative location 
A new automatic
monitoring station was
set up at Ravenscraig 
The monitoring site at
Sunnyside Rd,
Coatbridge, was
decommissioned.
The monitoring site at
Calder St, Coatbridge
was decommissioned
in favour of the new
Whifflet site at Whifflet
Cross A725. 
One new PM analyser
(FIDAS) and two new
NOx analysers were
purchased and
installed, as upgrades
to equipment within
existing monitoring
stations 
An extension of the
Dispersion Modelling
study carried out in
2020 was expanded in
2021 to include
Wishaw and Newmains Page 141 of 366

Page 142

North Lanarkshire Council
LAQM Annual Progress Report 2022 14
areas which feed
directly down past the
ongoing Ravenscraig
development site and
into Motherwell at the
AQMA
18
The Council will ensure that air quality is
included in the Council’s input to the NHS
Lanarkshire Joint Health Protection Plan and
carry out work with local health boards to raise
awareness of air pollution as a public health
issue
Public
information Other
NLC
Protective
Services
2018-
2021
2018-
2021 NA NA NA NA
This information is
requested by NHS
Lanarkshire at the time
they are preparing their
Plan. No requests for
information were
received from NHS
Lanarkshire in 2021
19
The Council commits to working with
neighbouring authorities where appropriate
on air quality projects to ensure consistency
of approach, as well as raising awareness of
air quality issues among a wider audience
Public
information
Joint/part
nership
working
NLC and
neighbouri
ng
authorities
2018 2018-
2021 NA Unknown In
place
Ongoi
ng
In 2021 in conjunction
with South Lanarkshire
Council we completed
and launched the
Treasure Trail route
may and APP for
Strathclyde Park. We
launched this on Clean
Air Day and offered 5
prizes for the winners. 
We had also planned
to run an Eco Stars
bus operator workshop
along with South
Lanarkshire Council
however this did not go
ahead due to covid
20
The Council pledges to carry out awareness
raising of air quality issues with communities
and schools. Part of this will involve taking
part in national Clean Air Day as well as other
relevant air quality initiatives and events
Public
information
Awarene
ss raising
NLC
protective
services
2018 2018-
2021 NA Unknown In
place
Ongoi
ng
With the ongoing
covid-19 pandemic and
restrictions around
non-teaching staff
going into schools it
was not possible to
undertake and school
outreach work in 2021
21
Planning policy:-
• The council pledges to develop
planning policy to reflect the
increasing demand/requirement for
Electric Vehicle charging points in
new public and private development
Policy
guidance
and
developme
nt control
Low
emission
strategy/
air quality
planning
and
NLC
planning
and
regeneratio
n service
2018 2018 NA NA In
place
Ongoi
ng
The Council’s updated
Local Development
Plan (LDP) has
recently been updated
and approved by the
Scottish Government Page 142 of 366

Page 143

North Lanarkshire Council
LAQM Annual Progress Report 2022 15
• Planning guidance for developers
will be updated to reflect current best
practice guidance on domestic wood
burning, commercial heating and
biomass
policy
guidance
to be adopted. This
LDP contains
information on the
importance of Air
Quality and also of EV
infrastructure provision
within its Environment
and Design Quality
Policies. 
The update of NLC air
quality planning
guidance is nearing
completion and a
training event is
planned to update
relevant parties on this.
22
The Council will undertake a feasibility study
into strategic planting of “green wall”
structures in relevant areas of North
Lanarkshire
NA NA NLC/extern
al agency
2018-
2021
2018-
2021 NA Unknown at
this time
Comp
leted
Comp
leted
A desktop literature
review study was
carried out in 2020 into
green wall
infrastructure with
regard to its suitability
for use within North
Lanarkshire
Page 143 of 366

Page 144

North Lanarkshire Council
LAQM Annual Progress Report 2022  16
3 Air Quality Monitoring Data and Comparison with
Air Quality Objectives
Summary of Monitoring Undertaken 
Automatic Monitoring Sites
This section sets out what monitoring has taken place and how local concentrations of the
main air pollutants compare with the objectives.
North Lanarkshire Council undertook automatic (continuous) monitoring at 10 sites during
2021. Table A.1 in Appendix A shows the details of the sites. National monitoring results are
available at http://www.scottishairquality.scot
Maps showing the location of the monitoring sites are provided at
http://www.scottishairquality.scot . Further details on how the monitors are calibrated and
how the data has been adjusted are included in Appendix C.
Two automatic monitoring sites were decommissioned in 2021, and two new automatic
monitoring sites were installed. The Sunnyside Rd (Coatbridge) automatic monitoring site
was decommissioned as monitored concentrations at this location were consistently low. In
addition to this the long-standing Calder Court (Whifflet, Coatbridge) automatic monitoring
station was decommissioned and a new monitoring site installed at Whifflet Cross, A725,
closer to the road, and more representative of receptor exposure. 
Also in 2021 a new automatic monitoring site was installed at Ravenscraig. This site was
chosen having taken due cognisance of the Ravenscraig Masterplan and current knowledge
of committed and proposed development planned for the site. The purpose of the new
automatic monitoring station is to provide data for before and after development in the area.
Data from the Ravenscraig monitoring station will not be active until 2022 and as such no
data from Ravenscraig is included in this report. 
Non-Automatic Monitoring Sites
North Lanarkshire Council undertook non- automatic (passive) monitoring of NO2 at 81 sites
during 2021. Table A.2 in Appendix A shows the details of the sites. Page 144 of 366

Page 145

North Lanarkshire Council
LAQM Annual Progress Report 2022 17
Maps showing the location of the monitoring sites are provided at
http://www.scottishairquality.scot . Further details on Quality Assurance/Quality Control
(QA/QC) and bias adjustment for the diffusion tubes are included in Appendix C. 
Other Monitoring Activities
Through the 2021/22 Scottish Government air quality monitoring grant funding North
Lanarkshire Council was able to purchase one low cost Zephyr air monitor. This will be
utilised for short-term, non-LAQM air quality monitoring projects.
Individual Pollutants
The air quality monitoring results presented in this section are, where relevant, adjusted for
annualisation and bias. Further details on adjustments are provided in Appendix C. 
Nitrogen Dioxide (NO2)
Table A.3 in Appendix A compares the ratified and adjusted monitored NO2 annual mean
concentrations for the past five years with the air quality objective of 40 µg/m3.
In 2021 the measured annual mean concentrations of NO2 at all automatic monitoring sites
in North Lanarkshire complied comfortably with the air quality annual mean objective of
40µg/m3.  The highest measured NO2 concentration noted at an automatic monitoring site
in 2021 was 14.8 µg/m3.
The highest measured NO2 concentrations in 2021 at the non-automatic monitoring sites
(Passive Diffusion Tube sites) were 27.2 µg/m3, recorded at Central Way, Cumbernauld
(DT61) and 27.1 µg/m3 at Grahamshill Street, Airdrie (DT135). At these recorded
concentrations, both are still far below the air quality statutory objective of 40 µg/m3.
For the duration of the reporting period (2021) Scotland was still in the midst of the Covid-
19 pandemic with various restrictions on activities and Government advice such as working
from home where possible to reduce transmission of the virus. Although not as strict as 2020
these restrictions and advice had an impact on the method and frequency of travel, which is
evident in the monitoring results from 2021 and makes it difficult to determine trends. Of the
81 Diffusion Tubes operated in North Lanarkshire in 2021 the monitored concentrations
were found to increase from 2020 levels in 50 Diffusion Tubes sites, but still remaining below
Page 145 of 366

Page 146

North Lanarkshire Council
LAQM Annual Progress Report 2022 18
2019 measured concentrations. For the remaining 31 Diffusion Tube sites measured
concentrations either remained the same or reduced slightly in 2021. 
For diffusion tubes, the full 2021 dataset of monthly mean values is provided in Appendix
B.
Table A.4 in Appendix A compares the ratified continuous monitored NO2 hourly mean
concentrations for the past five years with the air quality objective of 200µg/m3, not to be
exceeded more than 18 times per year. No exceedances of the hourly mean objective level
were measured at the automatic air monitoring stations in 2021. In addition, there were no
measured annual mean concentrations in excess of 60 µg/m3 at non-automatic (diffusion
tube) monitoring sites in 2021, indicating that exceedances of the 1-hour mean objective is
also unlikely at these sites.   
Particulate Matter (PM10)
Table A.5 in Appendix A compares the ratified and adjusted monitored PM10 annual mean
concentrations for the past five years with the air quality objective of 18µg/m3.
In 2021 all automatic continuous monitoring sites measuring PM10 in North Lanarkshire
complied comfortably with the annual mean air quality objective of 18 µg/m3. The range of
concentrations across all PM10 monitoring automatic sites was 8.5 – 10.2 µg/m3 and all sites
achieved a high level of data capture, with the exception of two monitoring stations (New
Edinburgh Rd, CM7 and Kenilworth Drive, Airdrie, CM10). Both these stations measure
PM10 using a Beta-Attenuation-Monitor (BAM) and there were several faults with these
monitors in 2021. Utilising Scottish Government air quality grant funding the BAM at the New
Edinburgh Road monitoring site was replaced with a FIDAS analyser. 
As with NO2 it is difficult to analyse trends in PM10 monitored concentrations due to the
impact of the Covid-19 pandemic however measured PM10 levels in 2021 were slightly
higher than in 2020. The increase, however, was not of the magnitude seen in the NO2
monitoring results for 2021 when compared to 2020 and as such, the conclusion suggested
last year that residual background PM10 remains the main component of total PM10 in North
Lanarkshire at this time.
In 2021 using Scottish Government air quality grant funding and following a robust
procurement exercise two of the BAM particulate analysers were replaced with FIDAS
analysers. This was in the New Edinburgh Road, Uddingston monitoring station, and in the Page 146 of 366

Page 147

North Lanarkshire Council
LAQM Annual Progress Report 2022 19
Adele Street, Motherwell monitoring station. These new FIDAS monitor both PM10 and PM2.5
at these sites.
As previously mentioned in Section 3.1.1 two automatic monitoring stations were
decommissioned and two new sites installed in 2021 in North Lanarkshire. Sunnyside Rd,
Coatbridge was decommissioned, as was Calder Street, Whifflet. A new automatic
monitoring site was installed at Whifflet Cross, A725, which is closer to the road and more
representative of receptor exposure. This new site at Whifflet Cross utilises a FIDAS
analyser to monitor PM10 and PM2.5. In addition to this a new monitoring site was installed
at Ravenscraig. Ravenscraig is a large former industrial site which is being re-developed
over a long number of years. It was felt that an automatic monitoring site should be installed
to obtain monitoring data as the re-development of the site progresses. The new
Ravenscraig automatic monitoring site utilises a FIDAS analyser to monitor concentrations
of PM10 and PM2.5.
Table A.6 in Appendix A compares the ratified continuous monitored PM10 daily mean
concentrations for the past five years with the air quality objective of 50µg/m3, not to be
exceeded more than seven times per year. There were no monitored exceedances of the
air quality objectives for PM10 in 2021. In addition to this there were no measured annual
mean concentrations in excess of 60 µg/m3 at non-automatic monitoring sites in 2021,
indicating that exceedance of the 1-hour mean objective is also unlikely at these sites. 
Particulate Matter (PM2.5)
Table A.7 in Appendix A compares the ratified and adjusted monitored PM2.5 annual mean
concentrations for the past five years with the air quality objective of 10µg/m3.
There were no exceedances of the annual mean objective for PM2.5 recorded at any of the
monitoring sites in North Lanarkshire in 2021. PM2.5 concentrations measured in 2021 were
similar to that measured in 2020, and slightly below that of 2019. In line with conclusions
drawn in 2020 it is unclear if this is related to reduced road traffic in 2021 as a result of the
Covid-19 pandemic. 
Two new PM2.5 monitoring sites were established in 2021. Whifflet Cross A725, and
Ravenscraig. Details of these have been provided in section 3.1.5
Page 147 of 366

Page 148

North Lanarkshire Council
LAQM Annual Progress Report 2022 20 
Sulphur Dioxide (SO2)
Following a number of years with no measured exceedances of SO2 and with the agreement
of the Scottish Government the monitoring of SO2 in North Lanarkshire ceased at the
beginning of 2018. 
Carbon Monoxide, Lead and 1,3-Butadiene
Historically, CO monitoring was undertaken at one site, Croy, where measured
concentrations were substantially below the CO objectives, with no exceedances of the air
quality objectives noted. Monitoring was discontinued at the end of 2017. No monitoring was
undertaken for Lead or 1,2-Butadiene concentrations within the Council area in 2021. No
significant sources of these pollutants have been identified in the previous round of review
and assessment. Should any sources become known to the Council then discussions 
around the monitoring of these pollutant would be undertaken to decide on the most
appropriate course of  action.
Page 148 of 366

Page 149

North Lanarkshire Council
LAQM Annual Progress Report 2022  21
4 New Local Developments
4.1 Road Traffic Sources
North Lanarkshire Council Roads and Transportation Team were consulted in relation to
changes in traffic flows on roads within North Lanarkshire in 2021 and the following
information was reported.
• Narrow, congested streets with residential properties close to the kerb – there are no
new/changed streets that meet this criteria
• Busy streets where people may spend one hour or more close to traffic – there are
no new/changed streets that meet this criteria
• Roads with a high flow of buses and/or HGVs – there are no new/changed roads that
meet this criteria
• Junctions – 
o A new junction has been created at Dimsdale Rd, Wishaw to accommodate a
new housing development. 
o A new access has been created off the roundabout on A73 Holytown to
accommodate additional development at Torrance Park
o A71 Horsley Brae junction upgrade under construction with anticipated
completion Autumn 2022
• New roads constructed or proposed – there are no new roads which meet the criteria,
other than possibly internal roads within new residential developments
• Roads with significantly changed traffic flows – there are no new/changed roads that
meet this criteria
• Bus or coach stations – there are no new/altered bus or coach stations 
In addition to the above information the following projects are of interest in terms of air quality
in North Lanarkshire.
• Calderbank – additional traffic calming measures have been introduced on the B802
Main Street, Calderbank
• Junction of A73 and South Biggar Road – a design has been finalised for the
construction of two mini roundabouts at the Craigneuk Road and South Biggar Road
Page 149 of 366

Page 150

North Lanarkshire Council
LAQM Annual Progress Report 2022 22
junctions. The tenders for the work are currently being assessed, and it is anticipated
works will begin in Autumn 2022.
City Deal Road Infrastructure Projects Update
Glasgow City Region Deal is an agreement between the UK Government, Scottish
Government and 8 local authorities, including North Lanarkshire Council. The City Deal
consists of a £1.13 billion Infrastructure Fund to create economic growth by improving
transport and regenerating or developing sites over the next 20 years. In North Lanarkshire,
City Deal investment will provide major road infrastructure to support the redevelopment of
Ravenscraig, as this is a nationally important development site. The main focus will be to
deliver the Pan Lanarkshire Orbital Transport Corridor, or Pan Lan as it is known.
The Pan Lan is a £127 million pound project linking the M74 in the south with the M80 on a
route through Ravenscraig. The Pan Lan will create a new and upgraded transport
infrastructure in North Lanarkshire. 
Pan Lan comprises three projects, as follows:-
East Airdrie Link Road
• Creating a new link road between Newhouse and Stand which will reduce traffic
congestion;
• Will link in with the Ravenscraig access infrastructure;
• Will improve air quality in the Chapelhall AQMA by relieving congestion along the
A73 and the Chapelhall AQMA;
• The road will have limited connections to the local road network in order to optimise
traffic flow. It will be a new single carriageway road link from north of the M8
(A723/Newhouse Interchange) to the A73, north of Riggend;
• The current stage is that the Stage 2 Phase 2 Public Engagement outlining the
options appraisal process and Strategic Environmental Assessment will take place in
June 2022 and sharing the preferred route will take place over summer 2022;
• Following Stage 2, consultants will be appointed in Autumn 2022 to develop the
design of the link road, with a view to submitting a planning application in Autumn
2023. 
Page 150 of 366

Page 151

North Lanarkshire Council
LAQM Annual Progress Report 2022 23
Ravenscraig Access Infrastructure North
• Plans for access to the north section of Ravenscraig involve upgrading 3km of the
A723 to provide a dual carriageway and shared footway/cycleway from the New Craig
Road junction at Ravenscraig to the M8 at Holytown;
• The current status is that an outline business case was approved by North
Lanarkshire Council and Glasgow City Region City Deal in 2020. The delivery
programme, as per the approved outline business case, is for works to start on site
in Sept 2023 and be completed in Dec 2025. Consultants to carry out further design
and project and contract manage the works will be appointed in late Summer 2022. 
Ravenscraig Access South
• Creating a new road link and pedestrian and cycle paths into Ravenscraig from
Airbles Road, and continuing to the Ravenscraig Regional Sports Facility;
• Planning permission has been granted for the new dual carriageway from
Ravenscraig Regional Sports Facility to Motherwell, including a new bridge crossing
under the West Coast Main Line railway, an improved junction at Airbles
Rd/Windmillhill Street and improved walking and cycling routes;
• A contractor has been appointed to deliver the West Coast Main Line crossing and
works commenced in May 2022 and is planned for completion in June 2023;
• It is anticipated that connection comprising a new dual carriageway and junction
works at Windmillhill Street will commence subject to successful procurement and
approval of a full business case in January 2023 and complete by June 2025.
In addition to the Pan Lan, City Deal are also involved in the following project.
M8/A8 Corridor Project
The City Deal Orchard Farm roundabout project involves a £2m funding contribution from
City Deal towards the development of a new junction on the A8 for heavy goods vehicles,
light commercial vehicles and cars to Mossend International Rail Freight Park and Mossend
rail head, as well as to the former Shanks and McEwan site and Carnbroe Business
Development. The roundabout will enable new industrial developments at these locations.
The project relies on PD Stirling Ltd delivering the Mossend International Rail freight park.
Further information can be viewed by searching the North Lanarkshire Council online Page 151 of 366

Page 152

North Lanarkshire Council
LAQM Annual Progress Report 2022 24
planning portal using the reference 19/00002/FUL.  The Outline Business
Case(OBC)  which includes the Orchard Farm Roundabout was approved by the Glasgow
City Region (GCR) Cabinet on 30th August 2022.  The OBC also includes 10km of strategic
Active Travel linking local communities with key employment sites along the A8/M8 to
stimulate modal shift and address access barriers for local areas. 
In addition to City Deal projects, the following works and planned infrastructure changes are
included as they will have an impact on local air quality in North Lanarkshire over the coming
years.
New Monklands Hospital
NHS Lanarkshire have purchased 161.5 acres of land at Wester Moffat, Airdrie. This is to
be the site for the replacement Monklands Hospital. Aspiring to be a “woodland hospital”
the chosen site is in a semi-rural location on the outskirts of Airdrie. The new hospital will
be accessed via the City Deal East Airdrie Link Road. The current status for the
replacement hospital is that a detailed planning application will be submitted to the council
in late 2022. 
Motherwell Town Centre Projects
Muir Street Travel Interchange, Motherwell
• Work is continuing on the creation of improved public transport interchange
arrangements on Muir Street in Motherwell town centre (adjacent to AQMA).
• The work involves creating an expanded bus stop on Muir Street to help alleviate
traffic congestion on Muir Street as it runs past Motherwell Rail Station. The bus stop
capacity will increase to 4 buses.
• A new access road is also being created from the roundabout at West Hamilton Road
to provide access to the station entrance for taxis, disabled parking and drop-off/pick-
up. A new taxi rank will also be created. This will help to remove vehicle conflicts and
congestion on Muir Street.
• The work is expected to be complete by Winter 2022/23. 
Page 152 of 366

Page 153

North Lanarkshire Council
LAQM Annual Progress Report 2022 25
Related planned projects (Motherwell Town Centre) Active Travel
• Work is planned to reconfigure the roundabout junction at Hope St/Muir St to a
signalised junction to improve pedestrian and cyclist access to Motherwell Rail
Station. 
• Active travel routes are also planned from the station north along Muir Street to
Braidhurst Industrial Estate and along Hope Street/Pollock Street into the town
centre.
• These works will be delivered over 2022 and 2023, subject to funding being secured.
• The design of a further three active travel routes (Hamilton Road, Merry Street and
Bellshill Road) is planned over 2022 and 2023. Delivery of the routes is subject to
securing funding.
Other Transport Sources
North Lanarkshire Council considered the relevant criteria set out in the template and can
confirm that there are no other significant transport sources to be considered in the report.
• Airports – there are no relevant sources in North Lanarkshire
• Locations were diesel or stream trains are regularly stationary for periods of 15
minutes or more, with potential for relevant exposure within 15m – there are no
relevant sources in North Lanarkshire
• Locations with large numbers of movements of diesel locomotives – no relevant
sources in North Lanarkshire
• Ports for shipping – there are no relevant sources within North Lanarkshire
Industrial Sources
On consulting with SEPA for this section the following responses were provided for 2021.
• Industrial installations : new or proposed installations for which an air quality
assessment has been carried out – SEPA advised that they were consulted on two
such installations in 2021 – 
o 20/00452/FUL -Installation of one Combined Heat and Power (CHP) unit,
waste heat boiler, transformer, lube oil tanks and gas booster with a 14m
stack. Site – Warburtons Bakery, Sholto Cres, Righead Ind Est, Bellshill.
SEPA presented no objections to this. Page 153 of 366

Page 154

North Lanarkshire Council
LAQM Annual Progress Report 2022 26
o 19/01284/FUL – Energy Recovery Centre with associated infrastructure. Site
– Greengairs Landfill Site, Meikle Drumgray Rd, Greengairs. Discharge of
various planning conditions. Original application (which included an AQIA)
considered in 2020. 
• Industrial installations : existing installations where emissions have increased
substantially or new relevant exposure has been introduced – SEPA responded that
as the 2021 Scottish Pollutant Release Inventory (SPRI) data is currently undergoing
quality checks SEPA are unable to provide information on any SEPA-regulated
installations where annual emissions have increased. SEPA advises that 2021
emissions data will be available in Autumn 2022. Data up to 2020 is available on the
SPRI website.
• Industrial installations : new or significantly changed installations with no previous
air quality assessment – SEPA responded with one premises
o PPC/A/1018364 – Woodhead, Eurocentral, ML1 4XL covering a substantial
variation to existing authorisation, which included an expansion of the process
on new land across the road and which was technically connected to the
original installation.
• Major fuel storage depots storing petrol – SEPA responded that there were no new
major fuel storage depots in North Lanarkshire area in 2021
• Petrol stations – our Trading Standards service advised that one new petrol station
became operational in 2021. This was Airdrie Service Station, Alexander Street,
Airdrie
• Poultry farms – SEPA responded that there were no poultry farms in North
Lanarkshire area in 2021
Commercial and Domestic Sources
On consulting with SEPA for details of any new commercial and domestic sources they
provided the following response:-
• Biomass combustion plant – SEPA has advised that no new Medium Combustion
Plants (MCPs) were permitted for North Lanarkshire area in 2021.
• Areas where the combined impact of several biomass combustion sources may be
relevant – there are no areas where levels of combined biomass combustion sources
are relevant.
Page 154 of 366

Page 155

North Lanarkshire Council
LAQM Annual Progress Report 2022 27
• Combined Heat and Power (CHP) Plant – SEPA responded that no new CHPs above
20MW were permitted in North Lanarkshire in 2021. One permit was issued in June
2021, however, for a site which could be considered a CHP. This was at Drumgray
Energy from Waste plant and concerned a “high efficiency condensing steam turbine
for the generation of electrical energy and allowing heat export. SEPA advises that
the plant may not be built for several years, or at all. 
• Areas where domestic solid fuel burning may be relevant – there are no areas in
North Lanarkshire where domestic solid fuel burning is a relevant source of air
pollution.
New Developments with Fugitive or Uncontrolled Sources
On consulting with SEPA the following information was provided:-
• Landfill sites – SEPA has advised that no new landfill sites were permitted in North
Lanarkshire in 2021.
• Quarries – SEPA advised that they are currently unable to carry out radius searches
of specific areas at present due to the 24th December 2020 cyber attack. 
• Unmade haulage roads on industrial sites – SEPA has reported that 4 waste
management licence exemptions (to enable the re-use of waste on sites for
unmade roads) were granted in 2021. 
o WML/XC/SEPA 2021-5839 – West Torrance Farm, Shotts. 
o WML/XC/1194685 – land east of Main St, Newmains, ML2 9BG.
o WML/XC/1175614 – Keepmoat Homes, Meadowhead Rd, Ravenscraig.
o WML/XC/1143631 – Springbank Quarry, Airdrie.
• Waste transfer stations – SEPA response advised that they are currently unable to
carry out radius searches of specific areas at present due to the 24th December
2020 cyber attack
• Other potential sources of fugitive particulate matter emissions - SEPA response
advised that they are currently unable to carry out radius searches of specific areas
at present due to the 24th December 2020 cyber attack 
Page 155 of 366

Page 156

North Lanarkshire Council
LAQM Annual Progress Report 2022  28
5 Planning Applications
North Lanarkshire Planning and Place service was consulted for details of any relevant
planning applications under consideration and planning applications granted consent during
2021 that have the potential to impact on local air quality. All relevant information is
presented in Table 5.1 below.
Table 5.1 – Relevant Planning Applications from 2021
Application
Number
Brief
Description
of
Development
AQ impact Comments/Further Information
19/00274/PPP Residential
development at
Heathfield Farm,
Muirhead.
AQ Impact
Assessment
submitted and
accepted. Not
in/near AQMA
https://eplanning.northlanarkshire.gov.uk/online-
applications 
20/00412/PPP Mixed use
development,
Westway Retail
Park, Wardpark,
Cumbernauld
AQ Assessment
submitted and
accepted. Not
in/near AQMA
https://eplanning.northlanarkshire.gov.uk/online-
applications 
21/01443/FUL Distribution
centre, Condor
Glen,
Eurocentral
AQ Assessment
submitted and
accepted. Not in
AQMA
https://eplanning.northlanarkshire.gov.uk/online-
applications 
21/01316/MSC
and
21/00982/PPP
Residential
development,
care unit etc.
Gowkthrapple
AQ Assessment
submitted and
accepted. Not
in/near AQMA
https://eplanning.northlanarkshire.gov.uk/online-
applications 
21/01275/FUL Roadside
services area,
AQ Assessment
submitted and
https://eplanning.northlanarkshire.gov.uk/online-
applications
Page 156 of 366

Page 157

North Lanarkshire Council
LAQM Annual Progress Report 2022 29
Hornshill,
Stepps (M80). 
accepted. Not
in/near AQMA 
21/00934/FUL Construction of
5 warehouses,
Bellshill Ind Est,
Bellshill
No AQ
Assessment
requested. Not
in/near AQMA
https://eplanning.northlanarkshire.gov.uk/online-
applications 
21/00436/FUL Construction of
primary school
to replace
existing 2
schools in same
area, Paddock
St, Coatbridge
AQ Assessment
submitted and
reviewed.
Accepted. Near
Coatbridge AQMA
https://eplanning.northlanarkshire.gov.uk/online-
applications 
21/00432/FUL Construction of
primary school,
Community
Health Centre
and Hub,
Muirhead
No AQ
Assessment
submitted. Not
in/near AQMA
https://eplanning.northlanarkshire.gov.uk/online-
applications 
21/00372/PPP Redevelopment
of office for
residential, St
Mungos Rd,
Cumbernauld
AQIA requested
although no
estimated
increase in traffic.
Not in/near AQMA 
https://eplanning.northlanarkshire.gov.uk/online-
applications 
21/00335/FUL Enabling works
for residential
development,
Main St,
Newmains
AQ Assessment
submitted and
accepted. 
Not in/near AQMA
https://eplanning.northlanarkshire.gov.uk/online-
applications 
21/00273/FUL Rail freight
terminal,
distribution
centre,
associated
infrastructure
AQ Assessment
submitted. Still
under
consideration
https://eplanning.northlanarkshire.gov.uk/online-
applications 
Page 157 of 366

Page 158

North Lanarkshire Council
LAQM Annual Progress Report 2022 30
21/00242/PPP Residential
development at
Palacecraig St,
Coatbridge
AQ Assessment
submitted and
accepted. In
Coatbridge AQMA
https://eplanning.northlanarkshire.gov.uk/online-
applications 
Page 158 of 366

Page 159

North Lanarkshire Council
LAQM Annual Progress Report 2022  31
6 Conclusions and Proposed Actions
Conclusions from New Monitoring Data
Conclusions from the 2021 monitoring data presented in this report can be summarised as
follows.
• Measured NO2 concentrations at all automatic monitoring sites in 2021 were well
below the statutory air quality objectives for both annual mean and short-term
statutory objectives. High levels of data capture were achieved at all sites. Measured
levels of NO2 at automatic monitoring stations remain around the same as 2020
levels, and below 2019 levels by approximately 30%. As with 2020, this is most likely
attributable to the Covid-19 pandemic and subsequent reduction in road traffic
emissions.
• In 2021 all passive Diffusion Tubes measured NO2 below the statutory annual mean
objective. The highest reading Diffusion Tubes recorded an annual mean of just over
27 µg/m3 of NO2 which is well below the statutory objective of 40 µg/m3. Almost two
thirds of Diffusion Tube sites in 2021 showed a greater rise towards 2019 levels than
was seen in the 2020 results. This could possibly be explained by Covid-19 pandemic
restrictions being less in 2021 than they were in 2020. 
• No NO2 monitoring sites breached the short-term statutory objective in 2021.
• All automatic PM10 monitoring undertaken in 2021 measured below the annual mean
objective, with levels in the range 8.5 – 10.2 µg/m3. Levels in 2021 were broadly
consistent with 2019 and 2020 further reinforcing the 2020 suggestion that the
measured level of PM10 mainly comprises the residual background level of PM10 in
the area. 
• In 2021 two of the Council’s air monitoring stations were upgraded to enable the
monitoring of PM2.5 bringing the total number of PM2.5 monitoring stations to nine.
Monitoring of PM2.5 in 2021 yielded results broadly similar to that of 2019 and 2020.
• Two automatic monitoring stations were decommissioned in 2021 – namely
Sunnyside Rd, Whifflet and Calder Court, Whifflet. Two new automatic monitoring
sites have been set up in 2021. One is Whiffle Cross, A725, which is within the
Coatbridge AQMA and is closer to the road and more representative of relevant
exposure.  The other new site is in Ravenscraig – this is to obtain monitoring data for
Page 159 of 366

Page 160

North Lanarkshire Council
LAQM Annual Progress Report 2022 32
before, during and following development of the Ravenscraig site over the coming
years. 
• Following the completion of a North Lanarkshire-wide dispersion modelling study it is
the council’s intention to conduct a comprehensive review of all monitoring sites, both
automatic and non-automatic (Diffusion Tube). The purpose of this is to ensure all
monitoring undertaken is in appropriate and relevant locations.
• In terms of air monitoring equipment – the council has been fortunate to be able to
utilise Scottish Government air quality grant funding to upgrade almost all of our
particulate analysers over the past several years. As our NO2 monitoring equipment
is now ageing it is our intention to work towards the replacement of this equipment
over the next couple of years. This will ensure the integrity of air quality monitoring
for NO2 in North Lanarkshire.
• We also intend to continue automatic air monitoring at the Croy monitoring station, at
least in the short-term, following the revocation of the Croy AQMA in 2022.
Conclusions relating to New Local Developments
North Lanarkshire Council’s Pollution and Public Health Team has taken due cognisance of
the information provided by the Council’s Development Management and Strategic Planning
Teams in relation to developments in 2021 and also in reviewing Air Quality Impact
Assessments that were submitted in support of planning applications in 2021. In considering
this we conclude that there are no significant issues in relation to new local developments.
This is due to the developments not being located in areas where air quality levels are close
to the statutory objective and/or the developments themselves did not lead to significant
effects on air quality or result in exceedances of air quality objectives at nearby sensitive
receptors. 
The Pollution and Public Health Team will continue to work with Planning colleagues to
identify any future developments that may present air quality issues and take any action
deemed appropriate at that time. 
We will also continue to have an input as required to City Deal projects and other major
infrastructure projects in order to highlight any potential impact on local air quality at the
earliest possible (pre-planning and Masterplanning) stage where possible.
Page 160 of 366

Page 161

North Lanarkshire Council
LAQM Annual Progress Report 2022 33
Proposed Actions
The focus of air quality work in North Lanarkshire in 2022/23 will be as follows.
• The Council’s Air Quality Action Plan will be updated and re-published. This will
involve engaging with internal and external stakeholders to ensure appropriate
involvement from all relevant services within the council. The updated action plan
should be completed in early 2023.
• The revocation of the Croy AQMA will be completed in 2022, following the necessary
consultation. No other changes to the remaining AQMAs are anticipated in 2022,
however we will be closely observing the monitored pollutant levels across the area
as we emerge from the Covid-19 pandemic and its associated restrictions are lifted.
• Following completion of a North Lanarkshire-wide dispersion modelling study we will
undertake a comprehensive review of all our monitoring sites, both automatic and
non-automatic. We will also pay close attention to the new automatic air monitoring
stations at Whifflet Cross A725 and Ravenscraig.
• The Pollution Control and Public Health Team will continue to act as a consultee for
development management, major infrastructure and City Deal planned projects,
highlighting air quality where necessary at the earliest possible stage in the planning
process.
• New air monitoring equipment will be purchased as necessary, subject to Scottish
Government air quality funding, to replace ageing equipment in some of the existing
air monitoring stations.
• The Eco Stars Fleet Environmental Recognition Scheme for freight/fleet operators
will continue to be run in 2022/23. In addition to this a new, separate Eco Stars taxi
operator scheme will be introduced. We will also strive to run two Eco Stars
workshops in conjunction with South Lanarkshire Council. One for bus operators and
one for taxi operators, to encourage uptake of relevant grants and membership of the
Eco Stars scheme
• Subject to Scottish Government air quality funding we will continue to support
projects relating to sustainable travel and the encouragement of walking and cycling
as alternatives to car travel. 
Page 161 of 366

Page 162

North Lanarkshire Council
LAQM Annual Progress Report 2022  34
Appendix A: Monitoring Results
Table A.1 – Details of Automatic Monitoring Sites
Site ID Site Name Site Type X OS
Grid Ref
Y OS
Grid Ref
Pollutants
Monitored
In AQMA?
Which
AQMA?
Monitoring
Technique
Distance to
Relevant
Exposure (m)
(1)
Distance to
kerb of
nearest road
(m) (2)
Inlet
Height
(m)
CM1 Chapelhall Roadside 278174 663124 NO2
PM10 , PM2.5 
YES
(Chapelhall
AQMA) 
Chemiluminescent; 
FIDAS 20 10 2
CM2 Croy Special –
by quarry 272775 675738 NO2
PM10 , PM2.5
NO (recently
revoked
AQMA)
Chemiluminescent
FIDAS 30 10 2
CM3 Coatbridge
(Whifflet)
Urban
Backgroun
d
273674 663927 NO2
PM10, PM2.5
Y
(Coatbridge
AQMA)
FIDAS(3) 20 30 2
CM4 Motherwell Roadside 275458 656792 NO2
PM10 . PM2.5
Y
(Motherwell
AQMA)
FIDAS 20 8 2
CM5 Shawhead,
Coatbridge Roadside 273411 662997 NO2
PM10 , PM2.5
Y
(Coatbridge
AQMA)
FIDAS 22 20 2
CM6 Kirkshaws Roadside 272523 663030 NO2
PM10 , PM2.5
Y
(Coatbridge
AQMA)
FIDAS 20 8 2
CM7
New
Edinburgh Rd,
Uddingston
Roadside 269144 661496 NO2
PM10
N Chemiluniescent;
FIDAS 30 10 2
CM8(4) Sunnyside Rd,
Coatbridge Roadside 273056 665234 NO2
PM10
N
Chemiluminescent;
BAM gravimetric
equivalent
30 10 2
CM9b(5)
Civic Centre,
Motherwell
(from 2015)N
Mobile Lab 275788 656219 PM10
PM2.5
Y Chemiluminescent;
TEOM 50 15 3
Page 162 of 366

Page 163

North Lanarkshire Council
LAQM Annual Progress Report 2022 35
Site ID Site Name Site Type X OS
Grid Ref
Y OS
Grid Ref
Pollutants
Monitored
In AQMA?
Which
AQMA?
Monitoring
Technique
Distance to
Relevant
Exposure (m)
(1)
Distance to
kerb of
nearest road
(m) (2)
Inlet
Height
(m)
CM10 Kenilworth
Drive, Airdrie Roadside 277385 665837 NO2
PM10
N
Chemiluminescent;
BAM gravimetric
equivalent
30 10 2
CM11 Adele Street,
Motherwell Roadside 275642 656148 NO2
PM10 , PM2.5
Y
(Motherwell
AQMA)
Chemiluminescent
FIDAS 20 0.75 2
CM12 Whifflet Cross,
A725 Roadside 273646 663867 NO2
PM10 , PM2.5
Y
(Coatbridge
AQMA)
Chemiluminescent
FIDAS  16 20 2
Notes:
(1) 0m if the monitoring site is at a location of exposure (e.g. installed on the façade of a residential property).
(2) N/A if not applicable.
(3) CM3 Whifflet Coatbridge – as stated in Annual Statistics Report for 2020, PM10 was monitored using Conventional TEOM Gravimetric
Equivalent technique for the month of January. From 28th January 2020 onwards, PM10 was monitored using the FIDAS technique.
(4) CM8 Sunnyside Rd, Coatbridge was disconnected in September 2020 and equipment was relocated to CM12 Whifflet Cross A725
with new PM2.5 analyser added.
(5) CM9b not utilised since 2020 
Page 163 of 366

Page 164

North Lanarkshire Council
LAQM Annual Progress Report 2022  36
Table A.2 – Details of Non-Automatic Monitoring Sites
Site ID Site Name Site Type
X OS
Grid
Ref
Y OS
Grid Ref
Pollutants
Monitored
In AQMA?
Which
AQMA?
Distance to
Relevant
Exposure (m)
(1)
Distance to
kerb of
nearest road
(m) (2)
Tube co-
located with a
Continuous
Analyser?
Tube
Height
(m)
DT10 Castle Court,
Castlecary Roadside 278528 677864 NO2 N 10 2 N 2.5
DT47 Lay-by in Stand Roadside 276538 668899 NO2 N 10 2 N 2.5
DT48
Bus stop, Bron
Way,
Cumbernauld
Kerbside 275920 674203 NO2 N 10 2 N 2.5
DT49 Swimming pool,
Kilsyth Kerbside 271514 678040 NO2 N 50 2 N 2.5
DT50
1791
Cumbernauld
Rd, Stepps
Kerbside 265198 668204 NO2 N 25 2 N 2.5
DT51
131
Cumbernauld
Rd, Stepps
Kerbside 265971 668567 NO2 N 30 2 N 2,5
DT52
Traffic lights
A80 Eastbound,
Moodiesburn
Kerbside 269966 670412 NO2 N 30 2 N 2.5
DT53
Traffic lights
A80 Westbound
Moodiesburn
Kerbside 269986 670400 NO2 N 10 2 N 2.5
DT54 (Site
renamed
DT58 in
2018)
Lochend
Rd/Coatbridge
Rd, Gartcosh
(A752)
Urban
background 269828 668354 NO2 N 20 2 N 2.5
DT55 Whitelaw Rd
end, Glenboig
Urban
background 272614 668138 NO2 N 50 2 N 2.5
DT56
Garnqueen Cr,
lamp post
LHSO, Glenboig
Urban
background 271751 668432 NO2 N 50 2 N 2.5
DT57
Main St/ Carrick
View jn,
Glenboig
Urban
background 272030 668564 NO2 N 10 2 N 2.5
Page 164 of 366

Page 165

North Lanarkshire Council
LAQM Annual Progress Report 2022 37
Site ID Site Name Site Type
X OS
Grid
Ref
Y OS
Grid Ref
Pollutants
Monitored
In AQMA?
Which
AQMA?
Distance to
Relevant
Exposure (m)
(1)
Distance to
kerb of
nearest road
(m) (2)
Tube co-
located with a
Continuous
Analyser?
Tube
Height
(m)
DT58 (site
was DT54
until
renamed
DT58 in
2018)
Lochend
Rd/Coatbridge
Rd, Gartcosh
(A752)
Urban
background 269828 668354 NO2 N 20 2 N 2.5
DT59
10-16
Coronation Pl,
Mount Ellen
Urban
Background 269356 669173 NO2 N 20 2 N 2.5
DT61
Under bridge
Central Way
Eastbound,
Cumbernauld
Roadside 275778 674440 NO2 N 10 2 N 2.5
DT62
Central Way A
Westbound,
Cumbernauld
Roadside 275920 674511 NO2 N 10 2 N 2.5
DT63
Central Way B
Westbound,
Cumbernauld
Roadside 275642 674271 NO2 N 10 2 N 2.5
DT64
Under bridge
Central Way,
Westbound,
Cumbernauld
Roadside 275666 674293 NO2 N 10 2 N 2.5
DT100 Civic Centre,
Motherwell Roadside 275820 656208 NO2
Y
Motherwell 10 2 N 2.5
DT101 Shields Rd,
Motherwell Roadside 274594 655113 NO2 N 15 2 N 2.5
DT102 Emily Dr,
Motherwell
Urban
background 275439 665696 NO2 N 15 2 N 2.5
DT103 Kethers Lane,
Motherwell
Urban
background 273986 656985 NO2 N 10 2 N 2.5
DT104 Coursington Rd,
Motherwell
Urban
background 276178 657344 NO2 N 20 2 N 2.5
DT105 Craigneuk Rd,
Carfin
Urban
background 277244 658415 NO2 N 10 2 N 2.5
Page 165 of 366

Page 166

North Lanarkshire Council
LAQM Annual Progress Report 2022 38
Site ID Site Name Site Type
X OS
Grid
Ref
Y OS
Grid Ref
Pollutants
Monitored
In AQMA?
Which
AQMA?
Distance to
Relevant
Exposure (m)
(1)
Distance to
kerb of
nearest road
(m) (2)
Tube co-
located with a
Continuous
Analyser?
Tube
Height
(m)
DT106 Camp St,
Motherwell
Urban
background 275654 656342 NO2 N 10 2 N 2.5
DT107 Braehead Farm,
Bargeddie Roadside 270929 663464 NO2 N 500 50m to A8 N 2.5
DT108
MSA Factory,
Shawhead,
Coatrbridge
Roadside 273830 662676 NO2 N 500 50m to A8 N 2.5
DT110
New Edinburgh
Rd(1), M74,
Uddingston
Roadside 272789 675735 NO2 N 30 2 N 2.5
DT111
New Edinburgh
Rd(2), M74,
Uddingston
Roadside 272789 675735 NO2 N 15 2 N 2.5
DT112
New Edinburgh
Rd(3), M74,
Uddingston
Roadside 272789 675735 NO2 N 10 2 N 2.5
DT113 Tinkers Lane,
Motherwell Roadside 274305 656466 NO2 N 20 2 N 2.5
DT114 Main St,
Overtown Kerbside 280370 653072 NO2 N 15 2 N 2.5
DT115
Plantation
Rd/Ravenscraig
Spine Rd
Kerbside 277282 657607 NO2 N 15 2 N 2.5
DT116 Delburn St,
Motherwell
Urban
background 275981 656111 NO2
Y
Motherwell 10 2 N 2.5
DT117 Hamilton Rd,
Motherwell
Urban
background 275091 656986 NO2 N 20 2 N 2.5
DT118 (site
changed
number in
2017 to
newDT119 
see later in
table)
Shawhead
Roundabout Kerbside 273432 662965 NO2
Y
Coatbridge 30 2 N 2.5
Page 166 of 366

Page 167

North Lanarkshire Council
LAQM Annual Progress Report 2022 39
Site ID Site Name Site Type
X OS
Grid
Ref
Y OS
Grid Ref
Pollutants
Monitored
In AQMA?
Which
AQMA?
Distance to
Relevant
Exposure (m)
(1)
Distance to
kerb of
nearest road
(m) (2)
Tube co-
located with a
Continuous
Analyser?
Tube
Height
(m)
DT119 Kirkshaws Rd,
Coatbridge Kerbside 273436 662982 NO2
Y
Coatbridge 30 2 N 2.5
DT120 Watsonville,
Motherwell Kerbside 275237 656662 NO2
Y
Motherwell 10 2 N 2.5
DT121 Flannigan Rd,
Bellshill
Urban
background 273180 660350 NO2 N 30 2 N 2.5
DT122 Main St,
Mossend Roadside 274082 660308 NO2 N 60 2 N 2.5
DT123
Hamilton Rd,
Orbiston
Bellshill
Kerbside 272687 659512 NO2 N 20 2 N 2.5
DT124 Scotmid,
Tannochside Kerbside 270073 661870 NO2 N 20 2 N 2.5
DT125
Main St nr
Motherwell Rd,
Bellshill
Kerbside 273767 661281 NO2 N 25 2 N 2.5
DT126 Main St nr
Tesco, Bellshill Kerbside 273541 660339 NO2 N 2 2 N 2.5
DT129 Newmains
Police Station Roadside 282392 656016 NO2 N 7 2 N 2.5
DT130
Main St
(bottom),
Wishaw
Roadside 279118 655327 NO2 N 5 2 N 2.5
DT131 Brandon Pl,
Bellshill Roadside 272302 659237 NO2 N 5 2 N 2.5
DT132 Airdrie Rd,
Caldercruix Roadside 281713 667517 NO2 N 10 2 N 2.5
DT133 Coatbridge 1,
Bank Street Roadside 272887 664991 NO2 N 2 2 N 2.5
DT134 Coatbridge 2,
Whifflet Court Kerbside 273655 664003 NO2
Y
Coatbridge 10 20 N 2.5
DT135 Grahamshill St,
Airdrie Kerbside 277276 665615 NO2 N 10 2 N 2.5
Page 167 of 366

Page 168

North Lanarkshire Council
LAQM Annual Progress Report 2022 40
Site ID Site Name Site Type
X OS
Grid
Ref
Y OS
Grid Ref
Pollutants
Monitored
In AQMA?
Which
AQMA?
Distance to
Relevant
Exposure (m)
(1)
Distance to
kerb of
nearest road
(m) (2)
Tube co-
located with a
Continuous
Analyser?
Tube
Height
(m)
DT136
Airdrie 3,
Springwells
Cres
Roadside 274162 674130 NO2 N 30 2 N 2.5
DT137 Auchenkilns,
Cumbernauld Roadside 274164 674130 NO2 N 30 2 N 2.5
DT138
Main St (near
shops),
Chapelhall
Roadside 278037 662798 NO2
Y
Chapelhall 10 2 N 2.5
DT139
Lauchope
St/Main St jn,
Chapelhall
Roadside 278178 663111 NO2
Y
Chapelhall 10 2 N 2.5
DT140 Dundyvan rd,
Coatbridge Kerbside 273293 664120 NO2 N 5 1 N 2.5
DT141
Main St(1),
Harthill(nr
shops)
Kerbside 290652 664493 NO2 N 10 2 N 2.5
DT142
Salsburgh
house no 337,
R15
Roadside 283850 663082 NO2 N 15 30 N 2.5
DT143
Main St(2),
Harthill(nr
shops)
Roadside 290482 664386 NO2 N 10 2 N 2.5
DT144 Lab 1, Constarry
Rd, Croy Roadside 272789 675735 NO2 N 100 5 Y 2.5
DT145 Lab 2, Constarry
Rd, Croy Roadside 272789 675735 NO2 N 100 5 Y 2.5
DT146 Lab 3, Constarry
Rd, Croy Roadside 272789 675735 NO2 N 100 5 Y 2.5
DT147
Bank St,
Coatbridge
(nearest house)
Roadside 272947 665037 NO2 N 15 0 N 2.5
DT148 Main St (R22),
Chapelhall Kerbside 278105 663174 NO2
Y
Chapelhall 15 2 N 2.5
DT149 Main St (R33),
Chapehall Kerbside 278119 663075 NO2
Y
Chapelhall 15 2 N 2.5
Page 168 of 366

Page 169

North Lanarkshire Council
LAQM Annual Progress Report 2022 41
Site ID Site Name Site Type
X OS
Grid
Ref
Y OS
Grid Ref
Pollutants
Monitored
In AQMA?
Which
AQMA?
Distance to
Relevant
Exposure (m)
(1)
Distance to
kerb of
nearest road
(m) (2)
Tube co-
located with a
Continuous
Analyser?
Tube
Height
(m)
DT150 Eastfield Rd,
Cumbernauld Kerbside 275160 676210 NO2 N 25 2 N 2.5
DT151 Main St,
Holytown
Urban
background 276635 660569 NO2 N 10 2 N 2.5
DT152
Coatbridge Rd
(shops),
Townhead
Roadside 272391 665824 NO2 N 10 2 N 2.5
DT153 72 Townhead
Rd, Coatbridge Roadside 271720 666053 NO2 N 20 2 N 2.5
DT154 Sunnyside Rd,
Coatbridge Roadside 273042 665176 NO2 N 20 2 N 2.5
DT156 Stirling St,
Airdrie Roadside 276005 665406 NO2 N 50 2 N 2.5
DT157 31 Station
Road, Muirhead Roadside 268442 669262 NO2 N 15 2 N 2.5
DT158a
Croftmoraig
Ave,
Moodiesburn
Kerbside 270281 671715 NO2 N 15 2 N 2.5
DT158b Deedes St,
Airdrie Roadside 274819 665005 NO2 N 7 2 N 2.5
DT159 Glenview Cres,
Moodiesburn Roadside 270391 671505 NO2 N 10 2 N 2.5
DT160 The Cuillins,
Moodiesburn Roadside 270067 671604 NO2 N 10 2 N 2.5
DT161 Bridgend Cres,
Moodiesburn Roadside 269071 670889 NO2 N 1 1 N 2.5
DT162
Auchingeoch
Rd,
Moodiesburn
Roadside 269022 670979 NO2 N 2 1 N 2.5
DT163
12 Inchwod Rd,
Westfield,
Cumbernauld
Roadside 273098 673321 NO2 N 10 1 N 2.5
DT164
12 Leckethill Ct,
Westfield,
Cumbernauld
Roadside 272634 672994 NO2 N 10 1 N 2.5
Page 169 of 366

Page 170

North Lanarkshire Council
LAQM Annual Progress Report 2022 42
Site ID Site Name Site Type
X OS
Grid
Ref
Y OS
Grid Ref
Pollutants
Monitored
In AQMA?
Which
AQMA?
Distance to
Relevant
Exposure (m)
(1)
Distance to
kerb of
nearest road
(m) (2)
Tube co-
located with a
Continuous
Analyser?
Tube
Height
(m)
DT165 Kildonan St,
Coatbridge Roadside 273727 665285 NO2 N 20 2 N 2.5
DT166 22 Cumbernauld
Rd, Chryston Roadside 268392 669502 NO2 N 10 2 N 2.5
NewDT54
Columba Ct/Old
Edinburgh Rd,
Viewpark
Roadside 271259 661016 NO2 N 15 2 N 2.5
NewDT55 Old Edinburgh
Rd, Viewpark Roadside 270463 661441 NO2 N 15 2 N 2.5
NewDT56 Bargeddie Roadside 270201 664281 NO2 N 10 2 N 2.5
NewDT102 Windmillhill St
(1), Motherwell Roadside 275738 656400 NO2
Y
Motherwell 50 1 N 2.5
NewDT103
Windmillhill
St(2),
Motherwell
Roadside 275733 656439 NO2
Y
Motherwell 20 1 N 2.5
NewDT106 Civic Centre(1),
Motherwell Roadside 275911 656237 NO2
Y
Motherwell 100 30 N 2.5
NewDT107 Civic Centre(2),
Motherwell Roadside 275911 656237 NO2
Y
Motherwell 100 30 N 2.5
NewDT108 Civic Centre(3),
Motherwell Roadside 275911 656237 NO2
Y
Motherwell 100 30 N 2.5
NewDT116
Airbles Rd
(Electric Bar),
Motherwell
Roadside 274814 656147 NO2 N 15 5 N 2.5
NewDT118 Merry St/Dalziel
St, Motherwell Roadside 275444 657312 NO2 N 15 5 N 2.5
NewDT119
(long-
standing
site, re-
numbered
from DT118
to DT119 in
2017)
Shawhead
Roundabout,
Coatbridge
Kerbside 273432 662965 NO2
Y
Coatbridge 30 2 N 2.5
Page 170 of 366

Page 171

North Lanarkshire Council
LAQM Annual Progress Report 2022 43
Site ID Site Name Site Type
X OS
Grid
Ref
Y OS
Grid Ref
Pollutants
Monitored
In AQMA?
Which
AQMA?
Distance to
Relevant
Exposure (m)
(1)
Distance to
kerb of
nearest road
(m) (2)
Tube co-
located with a
Continuous
Analyser?
Tube
Height
(m)
NewDT120 Kirkshaws Rd,
Coatbridge Roadside 271939 663179 NO2
Y
Coatbridge 10 2 N 2.5
NewDT127 Matalan,
Wishaw Kerbside 278059 655368 NO2 N 10 2 N 2.5
NewDT128
Wishaw
Cross/Stewarton
St, Wishaw
Roadside 279587 655125 NO2 N 30 2 N 2.5
NewDT137 Main St, Village,
Cumbernauld Roadside 276710 676098 NO2 N 10 2 N 2.5
NewDT141 Station Rd,
Shotts Roadside 286840 656978 NO2 N 20 2 N 2.5
NewDT142 Stane Gdns,
Shotts Roadside 287954 659620 NO2 N 20 2 N 2.5
NewDT157a Swing Park,
Castlecary Roadside 278470 677901 NO2 N 30 2 N 2.5
Notes:
(1) 0m if the monitoring site is at a location of exposure (e.g. installed on/adjacent to the façade of a residential property).
(2) N/A if not applicable. 
Page 171 of 366

Page 172

North Lanarkshire Council
LAQM Annual Progress Report 2022  44
Table A.3 – Annual Mean NO2 Monitoring Results (µg/m3)
Site ID Site Type Monitoring
Type
Valid Data
Capture for
Monitoring Period
(%) (1)
Valid Data
Capture 2021 (%)
(2)
2017 2018 2019 2020 2021
CM1-Chapelhall Roadside Automatic 99.5% 99.5% 33.8 27.7 21.7 18.0 14.8
CM2 - Croy Special-by quarry Automatic 99.3% 99.3% 20.4 17.5 19.0 12.0 10.0
CM3-Calder Ct, Whifflet Urban background Automatic 93.6% 96.6% - - 17.2 12.0 11.5
CM4-Menteith Rd,
Motherwell Roadside Automatic 93.6% 93.6% - - - 12.6 10.8
CM5-Shawhead,
Coatbridge Roadside Automatic 91.1% 91.1% 28.5 20.7 20.3 16.0 14.2
CM6-Kirkshaws,
Coatbridge Roadside Automatic 96.2% 96.2% 22.0 18.3 20.3 13.0 13.6
CM7-New Edinburgh Rd,
Uddingston Roadside Automatic 98.3% 98.3% - - 24.4 17.0 16.6
CM8 – Sunnyside Rd,
Coatbridge Roadside Automatic - - - - 22.6 - -
CM10-Kenilworth Dr,
Airdrie Roadside Automatic 96.5% 96.5% - - 16.9 14.0 11.9
CM11-Adele St,
Motherwell Roadside Automatic 78.8% 78.8% - - - - 9
CM12-Whifflet Cross
A725 Roadside Automatic 89.5% 60.0%     13.9
DT10- Castle Ct,
Castlecary Roadside Diffusion
Tube - - 34.2 - - - 
DT47-Lay by in Stand Roadside Diffusion
Tube 100% 100% 21 21.7 21.4 14.7 14.0
DT48-bus stop, Bron
Way, Cumbernauld Kerbside Diffusion
Tube 100% 100% 28.9 27.3 25.7 17.8 16.9
DT49- Swimming Pool,
Kilsyth Kerbside Diffusion
Tube 100% 100% 17.4 22.5 18.3 11.2 13.0
DT50-1791 Cumbernauld
Rd, Stepps Kerbside Diffusion
Tube 100% 100% 22.4 21.9 20.2 12.4 16.0
DT51- 131 Cumbernauld
Rd, Stepps Kerbside Diffusion
Tube 100% 100% 24.7 27.4 21.0 14.6 16.8
Page 172 of 366

Page 173

North Lanarkshire Council
LAQM Annual Progress Report 2022 45
Site ID Site Type Monitoring
Type
Valid Data
Capture for
Monitoring Period
(%) (1)
Valid Data
Capture 2021 (%)
(2)
2017 2018 2019 2020 2021
DT52 – Traffic lights A80
Eastbound, Moodiesburn Kerbside Diffusion
Tube 100% 100% 17.4 25.4 22.6 14.6 14.2
DT53-traffic lights A80
Westbound, Moodiesburn Kerbside Diffusion
Tube 100% 100% 20.9 22.9 18.3 10.5 11.1
DT54- Coatbridge
Rd/Gartcosh Rd A752
Gartcosh (name changed
to DT58 in 2018)
Urban background Diffusion
Tube - - 22.8 - - - -
DT55-Whitelaw Rd end,
Gartcosh Urban background Diffusion
Tube - - 9.7 - - - -
DT56-Garnqueen Cr,
Glenboig Urban background Diffusion
Tube - - 14.3 - - - -
DT57-Main St/Garrick
View, Glenboig Urban background Diffusion
Tube 100% 100% 16.2 18.1 16.6 - 12.8
DT58-Lochend
Rd/Coatbridge Rd
(previously called DT54,
changed in 2018)
Urban background Diffusion
Tube 100% 100% - 25.8 22.9 9.8 17.9
DT59-10-16 Coronation
Pl, Mount Ellen Urban background Diffusion
Tube 100% 100% 17.2 19.8 17.7 14.3 12.5
DT61-under Central Way,
Eastbound, Cumbernauld Roadside Diffusion
Tube 100% 100% 51.3 43.6 40.5 12.6 27.2
DT62-Central Way
Westbound (A),
Cumbernauld
Roadside Diffusion
Tube 100% 100% 38.1 39.0 32.9 25.8 24.2
DT63-Central Way
Westbound (B),
Cumbernauld
Roadside Diffusion
Tube 100% 100% 26.7 45.7 37.5 17.9 26.6
DT64-Under Central Way,
Westnound, Cumbernauld Roadside Diffusion
Tube 100% 100% - 32.2 28.7 21.2 21.8
DT100 – Civic Centre,
Motherwell Roadside Diffusion
Tube 100% 100% - 36.9 36.9 15.6 22.1
DT101- Shields Rd,
Motherwell Roadside Diffusion
Tube 100% 100% 23.2 24.9 20.1 22.4 14.8`
Page 173 of 366

Page 174

North Lanarkshire Council
LAQM Annual Progress Report 2022 46
Site ID Site Type Monitoring
Type
Valid Data
Capture for
Monitoring Period
(%) (1)
Valid Data
Capture 2021 (%)
(2)
2017 2018 2019 2020 2021
DT102-Emily Dr,
Motherwell Urban background Diffusion
Tube - - 10.8 - - - -
DT103-Kethers Lane,
Motherwell Urban background Diffusion
Tube - - 15.8 - - - -
DT104-Coursington Rd,
Motherwell Urban background Diffusion
Tube 100% 100% 11.9 10.5 10.5 10.2 7.7
DT105-Craigneuk Rd,
Carfin Urban background Diffusion
Tube 92% 92% 13.5 16.4 12.6 11.5 10.3
DT106-Camp St,
Motherwell Urban background Diffusion
Tube - - 18.2 - - - -
DT107-Braehead Farm,
Bargeddie Roadside Diffusion
Tube - - 23.7 - - - -
DT108-MSA Factory,
Shawhead Roadside Diffusion
Tube - - 27.7 - - - -
DT110-New Edinburgh
Rd(1), Uddingston Roadside Diffusion
Tube 100% 100% 33.7 33.8 28.9 20.2 23.9
DT111-New Edinburgh
Rd(2), Uddingston Roadside Diffusion
Tube 100% 100% 31.7 30.4 31.1 22.2 19.0
DT112-New Edinburgh
Rd,(3), Uddingston Roadside Diffusion
Tube 100% 100% 32.7 32.3 28.6 20.3 23.4
DT113-Tinkers Lane,
Motherwell Roadside Diffusion
Tube 100% 100% 21.8 22.0 17.9 14.1 14.4
DT114-Main St, Overtown Kerbside Diffusion
Tube 100% 100% 19.6 17.7 15.0 14.1 9.9
DT115-Plantation Rd,
Ravenscraig, Motherwell Kerbside Diffusion
Tube 100% 199% - 15.4 13.8 10.7 8.2
DT116-Delburn St,
Motherwell Urban background Diffusion
Tube - - 23.1 - - - -
DT117-Hamilton Rd,
Motherwell Urban background Diffusion
Tube 100% 100% 30.3 27.4 26.8 18.6 19.5
DT118-Shawhead
roundabout, Coatbridge
(Changed to NewDT119
in 2018)
Kerbside Diffusion
Tube - - 28.2 - - - -
Page 174 of 366

Page 175

North Lanarkshire Council
LAQM Annual Progress Report 2022 47
Site ID Site Type Monitoring
Type
Valid Data
Capture for
Monitoring Period
(%) (1)
Valid Data
Capture 2021 (%)
(2)
2017 2018 2019 2020 2021
DT119-Kirkshaws Rd
(changed to NewDT119 in
2018))
Kerbside Diffusion
Tube - - 31.3 - - - -
DT120- Watsonville,
Motherwell Kerbside Diffusion
Tube - - 14.8 - - - -
DT121-Flannigan Grove,
Bellshill Urban background Diffusion
Tube 100% 100% 19.5 20.3 20.2 13.8 15.4
DT122-Main St, Mossend Roadside Diffusion
Tube 92% 92% 28.2 27.5 24.0 17.1 15.2
DT123-Hamilton Rd,
Orbiston, Bellshill Kerbside Diffusion
Tube 100% 100% 25.2 23.9 21.4 16.7 17.1
DT124-Scotmid,
Tannochside Kerbside Diffusion
Tube 100% 100% 25.6 29.5 23.5 15.7 16.3
DT125-Main
St/Motherwell Rd, Bellshill Kerbside Diffusion
Tube 100% 100% - 24.4 18.8 15.2 15.5
DT126-Main St, near
Tesco delivery rd, Bellshill Kerbside Diffusion
Tube 100% 100% 19.8 20.4 21.4 14.6 15.1
DT129-Newmains Police
Station Roadside Diffusion
Tube 100% 100% 26.5 27.7 27.3 17.7 21.5
DT130- Main St, Wishaw
(bottom) Roadside Diffusion
Tube 100% 100% 14.4 17.1 15.8 12.5 11.1
DT131- Brandon Pl,
Bellshill Roadside Diffusion
Tube 100% 100% 19.3 19.4 14.6 14.1 16.4
DT132 – Airdrie Rd,
Caldercruix Roadside Diffusion
Tube 100% 100% 14.3 16.8 15.8 10.2 9.9
DT133- Bank St (1),
Coatbridge Roadside Diffusion
Tube 92% 92% 33.4 30.4 30.1 17.5 23.5
DT134- Whifflet Ct (2),
Coatbridge  Kerbside Diffusion
Tube 92% 92% 23 19.8 20.4 12.8 15.4
DT135 -Grahamshill St,
Airdrie Kerbside Diffusion
Tube 100% 100% 33 29.3 28.3 22.1 27.1
DT136- Airdrie 3,
Springwell Cres Roadside Diffusion
Tube 100% 100% 20.1 21.1 17.9 11.0 14.5
DT137 – Auchenkilns,
Cumbernauld Roadside Diffusion
Tube - - 24.8 - - - -
Page 175 of 366

Page 176

North Lanarkshire Council
LAQM Annual Progress Report 2022 48
Site ID Site Type Monitoring
Type
Valid Data
Capture for
Monitoring Period
(%) (1)
Valid Data
Capture 2021 (%)
(2)
2017 2018 2019 2020 2021
DT138- Main St,
Chapelhall (nr shops) Roadside Diffusion
Tube 92% 92% 25 22.7 23.1 12.3 16.7
DT139- Lauchope
St/MainSt, Chapelhall Roadside Diffusion
Tube 92% 92% 39 29.4 28.1 18.1 22.8
DT140 – Dundyvan Rd,
Coatbridge Kerbside Diffusion
Tube 100% 100% 23.6 21.7 23.2 14.8 20.9
DT141- Main St,(1),
Harthill, nr shops Kerbside Diffusion
Tube - - 14.8 - - - -
DT142 -house no 337,
Salsburgh, R15 Roadside Diffusion
Tube - - 14.4 - - - -
DT143- Main St(2),
Harthill (nr shops) Roadside Diffusion
Tube 83% 83% 15.9 17.8 15.4 11.6 11.6
DT144-Lab 1, Constarry
Rd, Croy Roadside Diffusion
Tube 33% 33% 17.2 17.9 16.7 9.5 9.7*
DT145-Lab 2, Constarry
Rd, Croy Roadside Diffusion
Tube 33% 33% 17 20.4 16.4 9.9 10.4*
DT146- Lab 3, Constarry
Rd, Croy Roadside Diffusion
Tube 33% 33% 16.7 22.9 15.8 11.6 9.5*
DT147- Bank St,
Coatbridge (nearest
house)
Roadside Diffusion
Tube 100% 100% 31.6 28.5 27.4 13.7 20.2
DT148- Main St,
Chapelhall, R32 Kerbside Diffusion
Tube 92% 92% 28.8 31.2 28.0 17.6 20.6
DT149- Main St,
Chapelhall, R33 Kerbside Diffusion
Tube 100% 100% 31 26.9 29.1 17.2 20.7
DT150- Eastfield Rd,
Cumbernauld Kerbside Diffusion
Tube 100% 100% 20.1 19.2 18.7 11.2 11.8
DT151- Main St,
Holytown Urban background Diffusion
Tube 92% 92% 24.7 24.3 17.5 12.0 14.0
DT152- Coatbridge Rd,
(Townhead shops) Roadside Diffusion
Tube 100% 100% 28.9 28.6 30.3 20.7 20.3
D153- 72 Townhead Rd,
Coatbridge Roadside Diffusion
Tube 92% 92% 17.7 20.9 19.5 13.1 17.3
DT154- Sunnyside Rd,
Coatbridge Roadside Diffusion
Tube 100% 100% 33.9 24.7 27.4 18.3 21.5
Page 176 of 366

Page 177

North Lanarkshire Council
LAQM Annual Progress Report 2022 49
Site ID Site Type Monitoring
Type
Valid Data
Capture for
Monitoring Period
(%) (1)
Valid Data
Capture 2021 (%)
(2)
2017 2018 2019 2020 2021
DT156- Stirling Rd,
Airdrie Roadside Diffusion
Tube 100% 100% 33.8 30.9 28.4 18.9 26.0
DT157- Station Rd,
Muirhead Roadside Diffusion
Tube 100% 100% 25.6 34.1 22.3 14.4 19.1
DT158a- Croftmoraig
Cres, Moodiesburn Roadside Diffusion
Tube 100% 100% 17.9 18.4 17.8 11.2 11.4
DT158b- Deedes St,
Airdrie Roadside Diffusion
Tube 92% 92% 34.4 29.5 30.3 22.0 23.4
DT159- Glenview Cres,
Moodiesburn Roadside Diffusion
Tube 100% 100% 15.7 17.7 18.4 11.1 12.2
DT160- The Cuillins,
Moodiesburn Roadside Diffusion
Tube 100% 100% 15.7 17.6 18.4 10.7 11.3
DT161- Bridgend Cres,
Moodiesburn Roadside Diffusion
Tube 100% 100% 14.6 16.8 15.7 10.4 10.9
DT162- Auchegeoch Rd,
Moodiesburn Roadside Diffusion
Tube 100% 100% 19.5 19.4 18.3 11.6 12.1
DT163- 12 Inchwood Rd,
Westfield, Cumbernauld Roadside Diffusion
Tube 100% 100% 22.8 22.8 21.7 14.2 15.6
DT164 – 12 Leckethill Ct,
Westfield,  Cumbernauld Roadside Diffusion
Tube 100% 100% 18.2 19.5 19.0 11.2 9.9
DT165- Kildonan St,
Coatbridge Roadside Diffusion
Tube 83% 83% - 23.4 23.2 14.5 16.3
DT166 – 22 Cumbernauld
Rd, Chryston Roadside Diffusion
Tube 100% 100% - 28.7 26.0 14.7 16.8
NewDT54 – Columba
Ct/Old Edinburgh Rd,
Viewpark
Roadside Diffusion
Tube 100% 100% 22.9 25.6 23.6 14.0 16.4
NewDT55 – Old
Edinburgh Rd, Viewpark Roadside Diffusion
Tube 100% 100% 29.8 27.6 24.7 13.6 19.3
NewDT56 – Bargeddie Roadside Diffusion
Tube 100% 100% 20.3 20.6 20.0 12.2 14.1
NewDT102 – Windmillhill
St(1), Motherwell Roadside Diffusion
Tube 100% 100% 17.9 20.4 18.3 14.1 12.1
NewDT103 – Windmilllhilll
St(2), Motherwell Roadside Diffusion
Tube 92% 92% 21.1 25.9 20.7 16.6 15.1
Page 177 of 366

Page 178

North Lanarkshire Council
LAQM Annual Progress Report 2022 50
Site ID Site Type Monitoring
Type
Valid Data
Capture for
Monitoring Period
(%) (1)
Valid Data
Capture 2021 (%)
(2)
2017 2018 2019 2020 2021
NewDT 106 – Civic
Centre (1), Motherwell Roadside Diffusion
Tube - - 19.6 20.7 15.8 8.7 -
NewDT 107 – Civic
Centre (2), Motherwell Roadside Diffusion
Tube - - 19.6 19.6 18.2 11.9 -
NewDT 108 – Civic
Centre (3), Motherwell Roadside Diffusion
Tube - - 17 17.9 19.8 11.4 -
NewDT 116 – Airbles Rd,
(Electric  Bar), Motherwell Roadside Diffusion
Tube 92% 92% 17.7 22.3 17.2 13.3 14.3
NewDT 118 – Merry
St/Dalziel St, Motherwell Roadside Diffusion
Tube 92% 92% 27.7 28.3 24.1 17.1 17.6
NewDT119- Shawhead
roundabout, Coatbridge
(formerly DT118-
changed in 2017)
Kerbside Diffusion
Tube 100% 100% 28.2 27.8 23.7 18.5 19.7
NewDT120- Kirkshaws
Rd, Coatbridge (formerly
DT119, changed in 2017
Roadside Diffusion
Tube 100% 100% 31.3 26.5 24.4 18.9 20.5
NewDT 127 – Matalan,
Wishaw (formerly DT128,
number changed in 2017)
Kerbside Diffusion
Tube 100% 100% 27.1 24.3 26.6 18.9 18.0
NewDT 128 – Wishaw
Cross/Stewarton St,
Wishaw
Roadside Diffusion
Tube 100% 100% 26.5 26.7 27.9 21.8 22.6
NewDT137 – Main St,
Village, Cumbernauld
Roadside Diffusion
Tube 100% 100% 24 20.6 22.5 13.9 16.4
New DT141 – Station Rd,
Shotts
Roadside Diffusion
Tube 92% 92% 15 14.0 12.7 9.6 10.2
NewDT142 – Stane
Gdns, Shotts
Roadside Diffusion
Tube 92% 92% 14.8 18.4 16.9 11.8 12.8
Page 178 of 366

Page 179

North Lanarkshire Council
LAQM Annual Progress Report 2022 51
Site ID Site Type Monitoring
Type
Valid Data
Capture for
Monitoring Period
(%) (1)
Valid Data
Capture 2021 (%)
(2)
2017 2018 2019 2020 2021
NewDT157a Roadside Diffusion
Tube 100% 100% - 28.9 25.4 18.5 19.4
Notes:
Means for diffusion tubes have been corrected for bias. 
*All means have been “annualised” as per LAQM.TG(16) if valid data capture for the full calendar year is less than 75%. See Appendix C
for details. (Applies to DT144, 145 and 146, Croy)
(1) Data capture for the monitoring period, in cases where monitoring was only carried out for part of the year.
(2) Data capture for the full calendar year (e.g. if monitoring was carried out for 6 months, the maximum data capture for the full calendar
year is 50%).
(3) CM8 decommissioned – relocated to new CM12. 
Page 179 of 366

Page 180

North Lanarkshire Council
LAQM Annual Progress Report 2022  52
Table A.4 – 1-Hour Mean NO2 Monitoring Results, Number of 1-Hour Means > 200µg/m3
Site ID Site Type Monitoring
Type
Valid Data
Capture
for
Monitoring
Period (%)
(1)
Valid Data
Capture 2021
(%) (2)
2017 2018 2019 2020 2021
CM1-Chapelhall Roadside Automatic 99.5% 99.5% 6 0(142) 0(112) 0 0
CM2-Croy Special – by
quarry Automatic 99.3% 99.3% 0(104) 0(93) 0(77) 0(73) 0
CM3-Calder Ct, Whifflet Urban
background Automatic 96.9% 96.9% - - 0(78) 0 0
CM4-Menteith Rd, Motherwell Roadside Automatic 93.6% 93.6% - 0(125) 0(114) 0(113) 0
CM5-Shawhead Roadside Automatic 91.15 91.1% 0(125) 0(114) 0(113) 0 0
CM6-Kirkshaws Roadside Automatic 96.2% 96.2% 0 0(107) 0(114) 0 0
CM7-New Edinburgh Rd, Uddingston Roadside Automatic 98.3% 98.3% - - 0(87) 0 0
CM8-Sunnyside Rd, Coatbridge Roadside Automatic - - - - 9(105) - -
CM10Kenilworth Dr, Airdrie Roadside Automatic 96.5% 96.5% - - 0(83) 0 0
CM11-Adele St, Motherwell Roadside Automatic 78.8% 78.8% - - - - 0(75.1)
CM12-Whifflet Cross A725 Roadside Automatic 89.5% 60.0% - - - - 0(71)
Notes:
If the period of valid data is less than 85%, the 99.8th percentile of 1-hour means is provided in brackets.
(1) Data capture for the monitoring period, in cases where monitoring was only carried out for part of the year.
(2) Data capture for the full calendar year (e.g. if monitoring was carried out for 6 months, the maximum data capture for the full calendar
year is 50%). 
Page 180 of 366

Page 181

North Lanarkshire Council
LAQM Annual Progress Report 2022  53
Table A.5 – Annual Mean PM10 Monitoring Results (µg/m3)
Site ID Site Type
Valid Data
Capture for
Monitoring Period
(%) (1)
Valid Data
Capture
2021 (%) (2)
2017 2018 2019 2020 2021
CM1-Chapelhall Roadside 99% 99% 12.0 10.2 10.0 9.0 9.4
CM2-Croy Special – by quarry 100% 100% 11.3 12.2 11.0 8.0 8.5
CM3-Calder Ct, Whifflet, Coatbridge Urban background 100% 100% 11.4 6.9 13.5 8.0 8.5
CM4-Menteith Rd, Motherwell Roadside 89% 89% 13.0 9.7 11.0 9.0 9.6
CM5-Shawhead Roadside 99% 99% 14.0 4.9 10.0 8.0 9.1
CM6-Kirkshaws Roadside 100% 100% 9.0 9.6 20.0 9.0 8.9
CM7-New Edinburgh Rd, Uddingston Roadside 11% 11% - - 13.5 9.0 9.5
CM10-Kenilworth Dr, Airdrie Roadside 62% 62% - - 12.2 7.8 10.2
CM11-Adele St, Motherwell Roadside 97% 97% - - - 8.0 8.8
CM12-Whifflet Cross A725 Roadside 89.5% 60% - - - - 9.4
Notes:
All means have been “annualised” as per LAQM.TG(16), valid data capture for the full calendar year is less than 75%. See Appendix C
for details.
(1) Data capture for the monitoring period, in cases where monitoring was only carried out for part of the year.
(2) Data capture for the full calendar year (e.g. if monitoring was carried out for 6 months, the maximum data capture for the full calendar
year is 50%). 
Page 181 of 366

Page 182

North Lanarkshire Council
LAQM Annual Progress Report 2022  54
Table A.6 – 24-Hour Mean PM10 Monitoring Results, Number of PM10 24-Hour Means > 50µg/m3
Site ID Site Type
Valid Data
Capture for
Monitoring
Period (%) (1)
Valid Data
Capture
2021 (%) (2)
2017 2018 2019 2020 2021
CM1-Chapelhall Roadside 99% 99% 0.0 0(24) 1 0 0
CM2-Croy Special – by quarry 100% 100% 1(35) 0(42) 3 0(18) 0
CM3-Calder Ct, Whifflet, Coatbridge Urban background 100% 100% 0(29) 0(27) 0(22) 0 0
CM4-Menteith Rd, Motherwell Roadside 89% 89% 0.0 0(23) 2 0 0
CM5-Shawhead Roadside 99% 99% 0.0 0(19) 2 0 0
CM6-Kirkshaws Roadside 100% 100% 0(26) 0(21) 1 0 0
CM7-New Edinburgh Rd, Uddingston Roadside 11% 11% - - 0(21) 0(15) 0(18.3)
CM10-Kenilworth Dr, Airdrie Roadside 62% 62% - - 0(21) 0(23) 0(22.4)
CM11-Adele St, Motherwell Roadside 97% 97% - - - 0(18) 0
CM12-Whifflet Cross A725 Roadside 89.5% 60% - - - - 0(21.2)
Notes: 
If the period of valid data is less than 85%, the 98.1st percentile of 24-hour means is provided in brackets.
(1) Data capture for the monitoring period, in cases where monitoring was only carried out for part of the year.
(2) Data capture for the full calendar year (e.g. if monitoring was carried out for 6 months, the maximum data capture for the full calendar
year is 50%). 
Page 182 of 366

Page 183

North Lanarkshire Council
LAQM Annual Progress Report 2022  55
Table A.7 – Annual Mean PM2.5 Monitoring Results (µg/m3)
Site ID Site Type
Valid Data
Capture for
Monitoring
Period (%) (1)
Valid
Data
Capture
2021
(%) (2)
2017 2018 2019 2020 2021
CM1-Chapelhall Roadside 99% 99% 5.0 5.3 6.0 5.0 5.0
CM2-Croy Special – by quarry 100% 100% - 6.0 6.0 4.0 4.9
CM3-Calder St, Whifflet Coatbridge Urban background 100% 100% - - - - 5
CM4-Menteith Rd, Motherwell Roadside 89% 89%27 - 5.4 6.0 5.0 5.0
CM5-Shawhead Roadside 99% 99% - 5.6 6.0 5.0 4.8
CM6-Kirkshaws Roadside 100% 100% - 5.4 6.0 5.0 4.9
CM7-New Edinburgh Rd, Uddingston Roadside 11% 11% - - - - 5.0
CM11-Adele St, Motherwell Roadside 97% 97% - - - 4.5 5.0
CM12-Whifflet Cross A725 Roadside 89.5% 60% - - - - 5.2
Notes:
Exceedances of the PM2.5 annual mean objective of 10 µg/m3 are shown in bold.
All means have been “annualised” as per LAQM.TG(16), valid data capture for the full calendar year is less than 75%. See Appendix C
for details.
(1) Data capture for the monitoring period, in cases where monitoring was only carried out for part of the year.
(2) Data capture for the full calendar year (e.g. if monitoring was carried out for 6 months, the maximum data capture for the full calendar
year is 50%).
Page 183 of 366

Page 184

North Lanarkshire Council
LAQM Annual Progress Report 2022  56
Appendix B: Full Monthly Diffusion Tube Results for 2021
Table B.1 – NO2 2021 Monthly Diffusion Tube Results (µg/m3)
Site ID Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Annual Mean:
Raw Data
Annual Mean:
Bias
Adjusted (1)
DT47 27.9 1.5 7.9 13.5 13.4 13.6 12.0 2.0 17.4 21.5 20.2 22.9 14.5 14.0
DT48 <1.0 2.0 15.7 15.1 16.6 16.0 12.1 16.5 24.8 25.8 19.7 27.8 17.5 16.9
DT49 1.0 2.0 9.0 13.3 12.1 16.0 12.3 16.0 17.8 21.1 19.6 20.7 13.4 13.0
DT50 35.3 7.2 24.3 13.7 6.3 10.8 11.5 12.4 16.8 19.9 21.0 18.3 16.5 16.0
DT51 27.3 19.0 9.2 9.4 15.7 11.8 13.0 13.7 16.6 20.8 25.7 25.8 17.3 16.8
DT52 28.0 10.2 7.0 12.6 18.8 12.2 9.1 19.0 15.3 18.3 23.1 1.8 14.6 14.2
DT53 8.7 14.0 17.9 4.3 12.0 7.5 12.0 10.3 14.9 14.8 19.7 1.6 11.5 11.1
DT57 23.7 15.7 13.6 11.7 13.5 9.4 5.2 6.1 9.1 16.0 13.6 21.1 13.2 12.8
DT58 26.7 19.8 12.6 14.2 16.9 15.5 11.7 19.9 17.4 18.0 27.4 21.9 18.5 17.9
DT59 25.0 17.2 9.7 11.7 12.6 8.5 9.6 8.9 6.0 12.0 15.6 17.9 12.9 12.5
DT61 29.2 31.7 17.9 37.1 27.6 15.2 17.2 25.2 35.2 2.6 63.5 34.4 28.1 27.2
DT62 38.1 20.2 15.7 25.9 33.8 22.9 11.6 22.6 27.9 22.7 29.0 28.8 24.9 24.2
DT63 41.4 31.6 37.7 40.1 24.7 28.8 24.2 28.7 32.4 24.1 2.7 13.2 27.5 26.6
DT64 27.9 24.8 12.6 22.2 14.3 17.0 18.9 21.4 25.3 37.3 23.7 24.5 22.5 21.8
DT100 17.9 40.7 17.5 13.5 14.6 14.9 10.1 23.7 26.7 30.5 33.2 30.3 22.8 22.1
DT101 16.4 8.4 12.3 13.1 9.6 18.3 7.3 13.1 17.3 23.3 23.9 20.1 15.3 14.8
DT104 10.5 7.4 2.7 7.4 4.4 2.5 5.5 3.8 11.8 9.2 17.9 11.7 7.9 7.7
DT105 22.8 10.1 4.9 6.1 6.2 - 11.8 7.6 6.9 13.2 11.2 15.9 10.6 10.3
DT110 24.2 40.7 19.9 30.6 11.7 15.8 16.6 16.6 27.8 32.0 27.8 32.1 24.7 23.9
DT111 29.3 19.0 23.3 33.9 5.0 20.2 15.0 26.6 26.7 1.8 29.6 5.1 19.6 19.0
DT112 28.8 20.0 18.4 24.9 8.7 23.1 19.2 20.7 25.5 31.2 35.1 34.2 24.2 23.4
DT113 15.7 18.6 16.8 10.0 11.5 7.7 10.0 10.3 16.8 19.2 22.2 19.2 14.8 14.4
DT114 17.0 6.6 9.1 8.0 6.4 5.2 5.8 9.0 10.8 11.5 16.2 17.4 10.3 9.9
DT115 13.8 7.4 7.6 4.8 4.5 4.1 5.6 6.7 8.6 10.2 15.9 11.7 8.4 8.2
DT117 32.5 19.7 11.9 21.7 9.5 10.5 15.5 17.1 22.1 26.1 27.4 27.3 20.1 19.5
DT121 27.2 15.8 5.8 9.5 12.7 13.1 11.7 16.2 16.4 19.3 20.3 22.0 15.8 15.4
DT122 21.1 12.5 - 11.5 11.7 10.6 15.3 15.2 19.8 19.5 18.0 17.2 15.7 15.2
DT123 23.1 15.3 15.3 10.7 9.9 18.8 10.7 19.0 19.9 21.9 25.0 21.6 17.6 17.1 Page 184 of 366

Page 185

North Lanarkshire Council
LAQM Annual Progress Report 2022 57
Site ID Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Annual Mean:
Raw Data
Annual Mean:
Bias
Adjusted (1)
DT124 27.1 8.3 7.3 23.7 3.3 12.0 7.5 18.9 21.1 23.8 26.0 22.4 16.8 16.3
DT125 24.5 16.1 8.9 13.2 10.6 16.2 9.6 15.8 18.4 18.6 20.6 19.6 16.0 15.5
DT126 25.6 15.1 8.6 18.3 9.0 8.9 12.8 13.6 18.1 16.3 20.8 19.6 15.6 15.1
DT129 28.9 20.5 18.3 16.7 18.9 22.4 17.3 27.1 25.2 21.4 26.1 23.7 22.2 21.5
DT130 22.3 12.3 7.3 12.1 8.3 12.1 7.4 11.0 10.8 14.9 17.4 1.6 11.5 11.1
DT131 23.8 11.5 14.3 16.8 10.1 14.2 13.4 14.4 16.7 21.7 26.9 18.6 16.9 16.4
DT132 22.5 3.8 9.0 11.3 9.7 5.9 6.9 5.0 8.9 13.2 14.6 12.1 10.3 9.9
DT133 33.7 46.7 16.0 20.6 11.6 16.0 17.6 23.6 27.4 28.8 - 24.0 24.2 23.5
DT134 24.3 14.4 16.5 13.0 7.6 - 11.8 10.7 14.5 19.2 23.4 19.3 15.9 15.4
DT135 36.6 11.8 25.8 26.1 17.8 18.4 23.7 21.7 30.4 33.8 39.8 49.8 28.0 27.1
DT136 19.3 11.8 10.3 11.0 7.3 1.6 9.8 13.6 15.5 21.3 39.2 18.8 15.0 14.5
DT138 25.4 12.7 14.9 15.0 12.7 14.2 - 9.8 17.7 20.3 24.7 22.4 17.3 16.7
DT139 34.0 24.5 24.9 16.6 14.1 20.5 25.2 23.6 2.1 37.3 35.3 - 23.5 22.8
DT140 31.3 14.2 11.4 20.4 11.8 10.2 15.1 15.7 16.3 51,5 26.9 34.0 21.6 20.9
DT143 13.1 9.0 10.6 13.0 - - 7.7 11.2 12.5 14.6 13.4 14.3 11.9 11.6
DT144 18.8 - 8.3 - - - - - - 14.2 - 14.9 14.1 13.6
DT145 19.4 - 11.3 - - - - - - 14.4 - 15.2 15.1 14.6
DT146 14.1 - 8.7 - - - - - - 15.0 - 17.3 13.8 13.4
DT147 29.0 22.7 15.4 22.4 13.9 16.2 8.5 20.0 25.5 17.1 31.1 27.6 20.8 20.2
DT148 21.3 19.0 17.9 22.3 8.8 14.2 - 23.5 25.1 28.5 24.7 28.2 21.2 20.6
DT149 23.5 13.2 16.0 24.9 17.8 16.5 20.4 20.7 23.8 24.5 26.9 28.4 21.4 20.7
DT150 13.4 9.4 9.2 13.7 7.4 9.8 9.8 12.4 13.9 13.8 14.6 18.1 12.1 11.8
DT151 23.1 8.1 14.2 17.5 8.9 - 11.1 11.3 15.6 18.9 21.4 18.7 15.3 14.9
DT152 29.4 23.5 19.9 20.6 13.4 13.1 14.8 19.0 19.1 23.9 27.5 27.0 20.9 20.3
DT153 27.0 - 15.8 16.8 11.4 10.5 16.2 13.4 17.0 21.2 23.9 22.9 17.8 17.3
DT154 24.0 18.1 15.8 25.3 15.9 16.9 18.9 22.4 26.0 28.2 30.4 24.5 22.2 21.5
DT156 27.0 29.0 19.0 25.3 16.1 20.1 16.3 27.5 833.0 34.8 51,4 22.2 26.8 26.0
DT157 31.8 19.4 21.2 21.2 10.2 15.5 23.1 13.5 22.7 28.2 27.5 1.5 19.7 19.1
DT158a 18.0 10.8 12.6 11.7 3.9 8.7 7.3 7.0 11.2 13.8 20.1 16.1 11.8 11.4
DT158b 26.5 10.3 23.3 21.4 24.1 - 23.1 24.7 30.0 33.1 23.5 25.3 24.1 23.4
DT159 18.6 9.7 8.7 12.5 12.3 7.0 10.5 11.9 15.3 14.4 14.2 16.1 12.6 12.2
DT160 19.3 8.0 5.6 11.9 5.4 11.9 10.6 5.3 12.9 13.9 16.8 17.6 11.6 11.3
DT161 18.5 16.3 8.2 5.6 11.2 8.7 11.9 7.2 11.0 11.8 12.0 12.0 11.2 10.9
DT162 13.3 21.2 8.6 10.9 8.9 11.9 8.5 8.8 15.2 15.3 14.1 11.8 12.5 12.1
DT163 21.8 11.1 19.2 17.2 10.1 12.6 10.5 14.6 15.1 16.1 19.8 24.4 16.0 15.6
Page 185 of 366

Page 186

North Lanarkshire Council
LAQM Annual Progress Report 2022 58
Site ID Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Annual Mean:
Raw Data
Annual Mean:
Bias
Adjusted (1)
DT164 10.3 13.6 10.7 11.5 9.3 6.2 8.2 9.6 10.6 12.8 17.7 1.6 10.2 9.9
DT165 19.3 12.9 19.7 17.5 12.8 11.1 13.3 - 18.7 21.7 - 21.3 16.8 16.3
DT166 19.8 10.7 15.2 17.6 16.2 10.6 13.0 20.1 14.4 20.4 27.0 23.1 17.3 16.8
NewDT54 34.7 13.8 10.1 15.9 17.0 12.7 11.1 13.8 18.0 14.2 14.7 27.4 17.0 16.4
NewDT55 32.1 22.5 11.6 23.9 19.8 15.2 12.0 14.7 14.1 19.9 25.1 28.0 19.9 19.3
NewDT56 31.5 9.3 11.2 14.4 13.4 11.2 6.8 9.6 13.0 14.9 16.9 22.0 14.5 14.1
NewDT102 13.9 13.4 10.1 8.2 7.7 6.2 8.7 12.2 14.4 18.0 20.8 16.1 12.5 12.1
NewDT103 18.9 15.6 9.5 11.5 - 7.6 12.8 12.5 19.6 20.3 22.6 20.0 15.5 15.1
NewDT106 - - - - - - - - - - - - - -
NewDT107 - - - - - - - - - - - - - -
NewDT108 - - - - - - - - - - - - - -
NewDT116 24.2 13.9 10.1 9.3 14.2 8.1 12.4 12.1 17.0 19.9 20.6 - 14.7 14.3
NewDT118 23.6 20.4 9.5 12.3 8.7 14.9 17.9 20.9 22.2 26.4 23.3 - 18.2 17.6
NewDT119 32.0 18.4 18.5 11.5 10.7 21.7 13.1 20.7 26.4 32.9 1.5 35.8 20.3 19.7
NewDT120 31.8 20.6 14.8 12.5 8.5 15.9 14.6 20.4 27.8 29.7 26.4 30.2 21.1 20.5
NewDT127 33.9 10.4 18.0 19.6 14.6 15.8 16.0 21.5 17.5 26.0 28.2 1.7 18.6 18.0
NewDT128 29.3 20.5 16.3 24.2 15.7 19.8 11.3 24.7 28.3 29.3 33.9 26.7 23.3 22.6
NewDT137 26.8 16.8 6.3 17.0 9.6 13.8 12.5 19.0 18.7 19.4 20.7 22.6 16.9 16.4
NewDT141 16.3 11.2 7.2 13.2 7.7 7.6 - 8.3 08.4 9.3 14.2 12.0 10.5 10.2
NewDT142 14.0 10.8 13.9 14.9 10.2 11.5 11.2 13.5 - 12.7 17.3 15.5 13.2 12.8
NewDT157a 31.8 19.4 21.2 10.2 15.5 23.1 13.5 22.7 28.2 27.5 1.5 25.7 20.0 19.4
Notes:
(1) See Appendix C for details on bias adjustment 
Page 186 of 366

Page 187

North Lanarkshire Council
LAQM Annual Progress Report 2022  59
Appendix C: Supporting Technical Information / Air
Quality Monitoring Data QA/QC
New or Changed Sources Identified Within North Lanarkshire
During 2021
North Lanarkshire Council has not identified any new sources relating to air quality within
the reporting year of 2021.
Additional Air Quality Works Undertaken by North Lanarkshire
Council During 2021
In 2021 further work was carried out on the large-scale dispersion modelling work that was
carried out in 2020. In 2021 this was expanded to include the Wishaw and Newmains areas
of North Lanarkshire that feed directly down past the ongoing Ravenscraig development
area and into Motherwell Town Centre and the Motherwell AQMA. The study took into
account the major committed development, and their projected impact on the Motherwell
AQMA.  The study report includes verification of model-predicted concentrations within NLC
monitoring data for the updated baseline year or 2019, and provides predictions of local air
quality in the future years of 2022 and 2028 across the study. 
Scottish Government air quality funding has been secured in 2022 to expand this study to
include all other areas of North Lanarkshire not already covered by the 2020 and 2021
dispersion modelling studies.
QA/QC of Diffusion Tube Monitoring
The diffusion tubes for the year 2021 were supplied and analysed by Glasgow Scientific
Services (GSS). The tubes were prepared using the 20% TEA in water preparation method.
All results have been bias adjusted and annualised (where required). GSS is a UKAS
accredited laboratory and participates in the AIR-PT Scheme (a continuation of the
Workplace Analysis Scheme for Proficiency (WASP) for NO2 tube analysis and the Annual
Field Inter-Comparison Exercise. These provide strict performance criteria for participating
laboratories to meet, thereby ensuring NO2 concentrations reported are of a high calibre.  
Page 187 of 366

Page 188

North Lanarkshire Council
LAQM Annual Progress Report 2022 60
The latest AIR-PT results are as follows:-
• AIR-PT AR040 (September to October 2020) – 100%
• AIR-PT AR042 (January to February 2021) – 50% 
• AIR-PT AR043 (May to June 2021) – 100%
• AIR-PT AR045 (July to August 2021) – 100%
• AIR-PT AR046 (September to October 2021) – No results
Over a rolling five round AIR-PT window, it is expected that 95% of laboratory results should
be greater than or equal to +2. If this percentage is substantially lower than 95% for a
particular laboratory, within this five-round window, then one can conclude that the
laboratory in question may have sources of error within their analytical procedure.
The AIR-PT AR042 results of 50% were investigated by the laboratory to the satisfaction of
their accreditation body UKAS and no reprocessing was required. 
Excluding this result, the results of all round results from 2021 were 100% demonstrating
satisfactory performance of the laboratory.
The monitoring was largely carried out in adherence with the 2021 Diffusion Tube Monitoring
Calendar, with the exception of one period of divergence as a result of staff holidays. DTs
40-49,50-166, 61-64 and 132 were changed on 18th August 2021 and not changed again
until 28th September 2021. Glasgow Scientific Services laboratory were advised of this and
have applied the appropriate correction to compensate for this. 
Diffusion Tube Annualisation
Annualisation was required for three PDT monitoring sites co-located at Croy, namely DT
144, DT 145 and DT 146 as they had a data capture of 33%. It was not possible to use the
Annualisation Tool or the Diffusion Tube Processing Tool to perform this task as it required
the raw hourly data for the continuous monitoring sites used in the process. We did not have
access to that and have therefore used the method from our annual reports as per Chapter
7: NOx and NO2 Monitoring of the Technical Guidance LAQM. TG16. The calculation
method is shown in Table C.2
All other diffusion tube monitoring locations within North Lanarkshire recorded data capture
of above 75% therefore no further annualization was undertaken. In addition, any sites with
a data capture below 25% do not require annualization. Page 188 of 366

Page 189

North Lanarkshire Council
LAQM Annual Progress Report 2022 61
Diffusion Tube Bias Adjustment Factors
North Lanarkshire Council have applied a national bias adjustment factor of 0.97 to the 2021
monitoring data. A summary of bias adjustment factors used by North Lanarkshire Council
over the past five years is presented in Table C.1.
Table C.1 – Bias Adjustment Factor
Year Local or National If National, Version of National
Spreadsheet Adjustment Factor
2021 National 06/22 0.97(1)
2020 National 06/21 0.89(1)
2019 National 06/20 0.87(1)
2018 National 03/19 0.92(1)
2017 National 06/18 0.90(1)
(1) Adjustment Factor was derived from using the average of the diffusion tubes
with Good Precision only 
Figure C.1 Glasgow Scientific Services  - National Average Bias Adjustment Factor
Spreadsheet 06/22 
Page 189 of 366

Page 190

North Lanarkshire Council
LAQM Annual Progress Report 2022 62
NO2 Fall-off with Distance from the Road
No diffusion tube NO2 monitoring locations within North Lanarkshire required distance
correction during 2021.
QA/QC of Automatic Monitoring
Automatic monitoring of NOx, PM10 and PM2.5 is completed within North Lanarkshire
Council using Chemiluminescence and FIDAS (PM10 and PM2.5) analysers. All data is
available in real-time and, following data dissemination, is ratified by Ricardo Energy and
Environment to AURN standards.
The data from the automatic monitoring stations is checked by the Local Site Operator (in-
house member of staff). 
Live and historic data are available from http://www.scottishairquality.scot/
Details of the calibration, servicing etc. arrangements for the automatic air monitoring
stations in North Lanarkshire are as follows.
• Automatic analysers are set up to calibrate themselves every 72 hours
• All automatic analysers are audited by Ricardo every six months
• Analysers are serviced by the maintenance contractor for the equipment every six
months. Maintenance contracts are in place for the analysers to ensure this. this also
covers attending faults as necessary.
• Our in-house LSO maintains the air station network in terms of filter changes, gas
ordering, initial fault-finding and reporting of faults, as necessary. They also carry out
visual checks on the monitors and ancillary equipment, enclosures etc. 
PM10 and PM2.5 Monitoring Adjustment
All PM10 and PM2.5 monitoring within North Lanarkshire is carried out using either the
conventional TEOM gravimetric equipment monitoring technique or the FIDAS monitoring
technique. All correction factors applied to monitoring data of PM10 and PM2.5 within North
Lanarkshire are detailed in the Annual Statistics Reports for the monitoring sites published
by Ricardo Energy and Environment. 
Page 190 of 366

Page 191

North Lanarkshire Council
LAQM Annual Progress Report 2022 63
Automatic Monitoring Annualisation
All automatic monitoring locations within North Lanarkshire Council recorded data capture
of greater than 75% therefore it was not required to annualise any monitoring data. In
addition, any sites with a data capture below 25% do not require annualisation.
NO2 Fall-off with Distance from the Road
No automatic NO2 monitoring locations within North Lanarkshire Council required distance
correction during 2021.
Page 191 of 366

Page 192

North Lanarkshire Council
LAQM Annual Progress Report 2022  64
Table C.2 – Annualisation Summary for PDT sites DT144, DT145 and DT146
(concentrations presented in µg/m3)
Background Site Annual Mean NO2
2021 (Am)
Period Mean NO22021
(Jan, Mar, Oct, Dec) (Pm) Ratio (Am/Pm)
CM3 Coatbridge Whifflet
(Urban Background) 11 16.5 0.67
Glasgow Townhead (Urban
Background) 7 9.75 0.72
Waulkimillglen (Rural) 18 23.75 0.76
Average Ratio (Ra) 0.71
PDT Site Raw Data
Annual Mean
Raw Data Bias
Adjusted (0.97)
Average
Annualisation
Factor
Annualised
Annual Mean
DT144 14.1 13.6 0.71 9.7
DT145 15.1 14.6 0.71 10.4
DT146 13.8 13.4 0.71 9.5
Page 192 of 366

Page 193

North Lanarkshire Council
LAQM Annual Progress Report 2022  65 
Glossary of Terms
Abbreviation Description
AQAP
Air Quality Action Plan - A detailed description of measures,
outcomes, achievement dates and implementation methods,
showing how the LA intends to achieve air quality limit
values’
AQMA
Air Quality Management Area – An area where air pollutant
concentrations exceed / are likely to exceed the relevant air
quality objectives. AQMAs are declared for specific pollutants
and objectives
APR Air quality Annual Progress Report
AURN Automatic Urban and Rural Network (UK air quality
monitoring network)
Defra Department for Environment, Food and Rural Affairs
DMRB Design Manual for Roads and Bridges – Air quality screening
tool produced by Highways England
FDMS Filter Dynamics Measurement System
LAQM Local Air Quality Management
NO2 Nitrogen Dioxide
NOx Nitrogen Oxides
PM10
Airborne particulate matter with an aerodynamic diameter of
10µm (micrometres or microns) or less
PM2.5
Airborne particulate matter with an aerodynamic diameter of
2.5µm or less
QA/QC Quality Assurance and Quality Control
SO2 Sulphur Dioxide
Page 193 of 366

Page 194

North Lanarkshire Council
LAQM Annual Progress Report 2022  66
References
LAQM Technical Guidance TG(16), Defra
Cleaner Air for Scotland : An Air Quality Strategy for Scotland, Scottish Government
North Lanarkshire Council Air Quality Action Plan 2018-2021
North Lanarkshire Council Annual Progress Report 2021
Page 194 of 366

Page 195

North Lanarkshire Council
Report
Environment and Climate Change Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref AMcP/VA Date 23/08/23 
Cemeteries Management Update 
From  Andrew McPherson, Chief Officer (Community Operations)  
E-mail McPhersonA@northlan.gov.uk Telephone 07939 280467 
1. Background 
1.1 Memorial Stabilisation is a high priority for North Lanarkshire Council following the
lessons learned from the fatal accident in Glasgow City Council in 2015.
Executive Summary 
The purpose of this report is to provide an update on changes to memorial management
to improve health and safety across the authority and to outline proposed improvements to
cemetery infrastructure, management and operations. 
Recommendations 
It is recommended that committee: 
1. Endorses the progress in addressing the risk associated with unsafe memorial
stones.
2. Endorses progress in making Health & Safety improvements across all cemeteries.
3. Endorses the proposed new management rules to restrict the height of memorials.
4. Endorses progress in increasing choice and affordability of interment options.
5. Approves a range of new burial options and charges.
6. Approves changes to summer funeral appointments.
7. Approves differential charges for Saturday and Public holiday interments.
8. Approves the permanent closure of a number of cemetery toilets.
9. Approves the removal of armistice wreaths in the last two weeks of March.
10. Notes delivery of infrastructure improvements across a number of cemeteries.
11. Endorses a trial of biodiversity enhancements in selected areas of old lairs and
cemetery margins 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (17) Ensure we keep our environment clean, safe, and attractive
Item 5
Page 195 of 366

Page 196

1.2 A previous report to committee in August 2022 outlined our approach to memorial
safety and undertook to bring a further report to committee in 2023.
1.3  A restructure in 2021 increased the Cemetery Asset team to five FTE. Their initial
priority has been the trenching of headstones which have been ‘orange-fenced’. 
These are classed as Category 1 in terms of risk and when found immediate action is
taken to fence and then, as soon as possible, trench these stones. Work within this
area continues and the estimated completion date for all known Category 1
headstones is late 2023. 
1.4  In recognition of the importance which cemeteries are held within the community,
additional permanent funding was provided to the service as part of the budget setting
process for 2023/24. This additional funding has allowed the recruitment of an
additional 8 cemetery asset operatives to undertake additional memorial inspection
and stabilisation during the winter months.  It is anticipated by Spring 2024 we will be
able to instigate an ongoing pro-active inspection and remediation policy aiming to
mitigate memorial risk as it is discovered, which will follow the Scottish Government
memorial management guidance issued in 2019. This revised policy is dependent on
improvements being brought forward through the current Digital NL sprint. This should
ensure that instances of memorial fencing and banding remain low, and regular
progress reports will be brought to committee. 
1.5 The 2023/24 budget also awarded funds for four additional gravediggers.  This
additional resource, combined with the cemetery asset operatives, will allow the
maintenance and grass cutting of all cemeteries to be undertaken exclusively by the
cemeteries team as opposed to the Land Services team. Although the principle of
cutting all grass to a similar frequency and standard was a sensible one, in practice it
has become very clear that the grass covering the cemetery of a loved one cannot,
and should not, be treated the same as that of a general greenspace site.
1.6 At the same time as addressing safety concerns within the existing cemeteries assets,
there is also a need to improve regulation of the memorial work that is undertaken by
external companies to reduce the risk of reintroducing any safety concerns. 
1.7 While the majority of memorial risk lies within the older cemetery estate, a recent incident
where a large newly installed headstone failed with potentially fatal consequences, has
led to a review of both the memorial masons’ permits and attendance, and the
management rules for memorialisation within cemeteries.  Although the service has an
open gate policy to allow grieving families unrestricted access to their family lair, this
should not be extended to any third parties undertaking headstone erection work within
the cemeteries and they should always be under the supervision of council employees. 
1.8 A report to Environment and Transportation committee in February 2022 highlighted the
issue of lawn memorialisation outwith the 12 inch area in front of the headstone that is
allowed in the management rules. The report highlighted the issues this presents for
efficient maintenance, and committee agreed that enforcement of management rules
should take place where this is an issue. 
1.9 Funeral costs remain a concern for families and a greater range of choice in interment
options can assist families in making choices about a fitting end of life tribute that is
affordable.  The service has reviewed practice across the country to inform this report 
and proposes to start to introduce a greater range of interment options as appropriate
and deliverable across our cemeteries.  This will also assist in efficient use of our
cemetery space and potentially reduce the pressure on burial space. 
Page 196 of 366

Page 197

1.10 Charges for Saturday and public holiday interments are currently the same as weekday
services. Many burial authorities across Scotland charge a premium for Saturday and
public holiday interments to reflect the higher staffing costs incurred. In the current
financial climate this is a burden on the service that can be mitigated by establishing a
higher charge for these appointments in cemeteries. 
1.11  Toilets have been closed since the pandemic, and the service has been unable to reopen
across all sites due to costs of upgrading toilets facilities to be fit for purpose and difficulty
in recruiting cleaning staff to take up limited hours in sometimes harder to reach
locations. 
1.12 As part of the 2022/23 budget a one off spend of £975K was awarded to cemeteries to
improve infrastructure and assist long-term maintenance. The service has completed
spend across several cemeteries. 
1.13 Our cemeteries represent a considerable land holding of the council and have the
potential to contribute significantly to our Local Biodiversity Action plan. We have a
Cemeteries and Burial ground plan, and the council have committed to the objective of
considering management changes to conserve and enhance biodiversity in
cemeteries.  Other authorities are improving their cemeteries for wildlife with new
management case studies across the country.  Any change in management regime
needs to be acceptable to cemetery visitors and we will consider emerging best practice
around engaging with the diverse community that uses cemeteries and explaining the
benefits of naturalised management in certain areas. 
2. Report   
Memorial Stabilisation Progress 
2.1 Memorial stabilisation is progressing toward the trenching of all current orange fenced
memorials. We currently have approximately 500 stones with orange fencing and the
memorial team are working towards completing this by 1st September 2023. 
2.2 The second phase of memorial stabilisation is to identify and contact lair holders for
smaller memorials that have been banded due to being identified as unsafe when a
neighbouring lair has been opened for an interment. A stone is banded using stakes
either side of the memorial and a banding around them to aid stability. There are
approximately 800 banded memorial stones. The completion date for this is 31st
December 2023.
2.3 The provision of the additional 8FTE as part of the investment within cemeteries has
allowed acceleration of these remedial works. 
Improvements to Health & Safety 
2.4  North Lanarkshire Council’s open gate policy in cemeteries has allowed contractors,
clients, and members of the public unlimited access. Councils have statutory duties to
ensure the health and safety of employees and visitors in burial grounds both in terms
of the Health and Safety at Work etc Act 1974 and the Occupiers Liability (Scotland)
Act 1974. Ensuring that memorials are in a safe state is a vital part of adhering to
these duties and that necessarily includes having oversight of work which is
conducted to memorials.
Page 197 of 366

Page 198

2.5 The service operates a Memorial Mason Registration Scheme which aims to establish
a uniform and best practice standard of workmanship and working practices throughout
all North Lanarkshire Council's cemeteries and churchyards. The scheme addresses
the standards needed for the installation, repair, and maintenance of memorials, both
new and existing. It ensures health and safety, and administrative requirements are
met, with a view to producing a common approach at every cemetery or churchyard
under the Council’s management. 
2.6 Following an internal Health and Safety review of memorial management, it has been
agreed that there must be a Council employee present on site when masons are
arriving to start work that involves erection, removal, or stabilisation of a memorial. 
On arrival, the Memorial Mason will present their Permit to Work and Fixer’s Licence
to the chargehand who will then ensure that the mason is attending the correct lair
and, where applicable, a suitable foundation has been installed ready for the erection
of a headstone.
2.7 No headstone erection, stabilisation or removal works will be permitted in the
absence of a chargehand which will prevent any memorial works on site over the
weekend when no chargehand cover is available. The majority of this work
undertaken by masons is delivered Monday to Friday so this will have limited impact
on the industry, but it will remove the previous risk that existed when masons
attended cemeteries at the weekend to undertake works without any supervision. 
Masons will be permitted to undertake engraving and lettering works at the
weekends, provided they have attended with their permit, and confirmed the work
location with the chargehand on the Friday preceding or by arrangement on a
Saturday if there are staff available. This scheme has been in place since early 2023
and is being proposed to be formalised through the management rules consultation. 
Memorial masons are currently working successfully with this change. 
Permit to Work Application Process
2.8 As part of the corporate move to digital processes, we will be moving the issuing of
memorial permits online as opposed to the current phone booking system. 
2.9  Moving to online booking will enable recording and issuing permits, booking
appointments and co-ordinating the memorial masons coming into the cemeteries
through one system. This will give the service a better overview and control of the
memorial work being carried out within cemetery premises. 
2.10 This process has been trialled in two cemeteries and initial issues around the booking
process resolved in discussion with participating memorial masons. This will be rolled
out to all cemeteries once a digital solution is fully in place. 
Management rules
2.11 A review of management rules across the council has taken place.  The review has
taken the opportunity to improve the clarity of the management rules and ensure
updated rules are included.  
2.12 In addition to the statutory consultation, the service undertook additional consultation
with memorial masons to gain feedback on the management rules.  A drop-in session
was arranged at Strathclyde Park on 6 June 2023 and all registered memorial
masons were contacted to advise of drop in arrangements, hard copy consultation via
libraries and the web location of the online consultation.  At the drop in event  Fu  one
query was raised regarding the proposed new rule to introduce a memorial height
Page 198 of 366

Page 199

restriction of 4 ft with a suggestion that 5ft would be more acceptable as it would have
only limited effect on the choice offered and would allow companies to utilise existing
stock. Further written comments were also received highlighting issues of customer
choice and existing stock. The service has looked at practice across Scotland and
has amended the proposed rules  changing the restriction to new memorials to
1500m (approx. 5ft) in height. Restriction to 1500mm still greatly reduces the liability
of memorial failure in cemeteries, while providing a range of choice in line with the
Charter for the Bereaved.  
2.13 Committee is asked to note that the revised management rules will be placed before
the Policy and Strategy committee in September 2023.  
Burial Choice
2.14 Giving a greater range of burial choice enables families to have a range of choice for
both end-of-life preference and financial consideration.  Across Scotland, authorities
are now offering a wider range of options for full coffin burial and interment of
cremated remains.
2.15 Additional burial ground is increasingly hard to find within council resources due to the
constraints such as drainage, previous mineral working, slope, access for
communities etc. Land identified as suitable often has competing priorities such as
housing or leisure. A wider range of choices also allows the service to better utilise
space in existing and new cemeteries. With identification of additional burial space
becoming increasingly challenging this is an important step in becoming more
environmentally responsible in our use of land for interment.
2.16 In developing new cemeteries, cemetery extensions and areas within existing
cemeteries, the service intends to explore the use of cremation remains only plots
which will be smaller in size, columbarium for cremated remains and lairs for single or
two coffin burials and gardens for scattering ashes. Previously we have designed
cemeteries around the ability of lairs to accommodate 3 full coffins, which restricts
which areas of a cemetery can be developed. Committee is asked to approve these
principles of greater choice in burial options for future developments and a further
paper will be presented to Committee when further detailed proposals are available. 
Changes to Fees and Charges
2.17 Outwith the standard lair charges currently in place, the service has looked at charges
for cremated remains, single/two coffin lairs and columbaria in other authorities and
balanced this with the desire to give families affordable alternatives and encourage
sustainable choices in burial preferences.
2.18 As detailed above, the costs associated with funerals on a Saturday or public holiday
come at an increased cost to the service through the necessity of overtime payments
etc. The majority of other local authorities apply an additional charge for funerals on
such days and it is proposed that this uplift is now also applied within our own
cemetery facilities. 
2.19 The table below provides details of the proposed charges to reflect the proposals in
paragraphs 2.17 and 2.18 above:
Service Provision Fee Notes
Page 199 of 366

Page 200

5-foot depth lairs (up to
two interments)
£800 Option to purchase two
adjoining plots to be
allowed if only one
interment possible
Cremated remains lair (up
to 6 interments
£540 New burial option
(currently only a full lair
purchase available) 
Scattering ashes in
communal rose garden
£40 New burial option
(currently only scattered
where a full lair is
purchased)
Uplift in charges for
Saturday and Public
Holiday interments
25% uplift on interment
fee
Currently no uplift applied 
Changes to summer hours to standard year-round service
2.20 Previously the cemetery service offered Mon – Friday 3pm burial slots April to
October and 12 noon slots on Saturdays. These slots are becoming increasingly hard
to staff as they depend on non-contractual overtime to enable staff to complete the
interment process. This can be as much as 6 hours for a Saturday 12pm
appointment. Staff consultation has indicated that there is increasing reluctance to
take on these additional hours. A review of uptake of these slots over the last two
years has shown a low uptake with less than 2 slots per month requested for 3pm in
total across our cemeteries and less than one Saturday 12 noon slot per month
requested. 
2.21 The committee is asked to approve a year-round schedule with the latest
appointments being 2pm on weekdays and 11am on Saturdays. 
Significant days of family remembrance 
2.22 It is recognised that there is a significant attendance at our cemeteries on Mother’s
Day and Father’s Day as well as around Christmas and Easter with families visiting
loved ones. The committee is asked to note that the cemetery teams are now well
aware of this increased usage over these periods and every attempt will be made to
ensure that the cemeteries are well presented at this time and the additional FTE will
assist in the enhanced resourcing over this time.
Cemeteries Public Toilet Facilities
2.23 All cemetery toilets were closed during the pandemic. The service has faced challenge
in reopening public toilets in cemeteries due to the aged state of some facilities and the
require for upgrade to reach an acceptable standard. In addition, our Facility Services
team have difficulty in recruiting cleaning staff to the short hours contracts in sometimes
harder to access sites. As visits to cemeteries are generally of short duration, the
service proposes to permanently close all cemeteries toilets that are no longer fit for
purpose with the exception of those recently upgraded facilities at Bothwellhaugh and
Coltswood which would remain open. 
Cemeteries upgrades 
2.24 Following one off spend allocated to cemeteries in financial year 2022/23, a number of
improvement works have taken place. To date the following projects have been
completed:
Page 200 of 366

Page 201

• Holytown Cemetery wall 
• Red Ash paths topping up in various cemeteries 
• Eastfield Cemetery, Cumbernauld - Drainage section D
• Various smaller scale design, drainage and path finishes across several
cemeteries
• Bothwellpark path works 
• Cambusnethan Pathworks/drainage at section G
• Kilsyth cemetery drainage
• Property Repairs 
The following works are in development to complete spend this financial year
• Old Monkland drainage
• St Patricks's phase 3 drainage
• Bothwellhaugh foundations within section D
• Cambusnethan Reconstruction of footpaths including gullies and drainage.
• Cambusnethan Pathworks and drainage at section K
• Cambusnethan infrastructure to enable additional lairs 
In addition, the service has been awarded £250K to make upgrades to staff bothys and
ensure the expanded workforce has fit for purpose welfare facilities 
Armistice wreaths 
2.25 A motion was passed by full council on 16 December 2021 stating that “This Council
understands that Remembrance Sunday is a poignant and moving day of reflection
when we commemorate the great sacrifices of our servicemen and women who paid
the ultimate price in defending our country at home and abroad. Further understands
that it can be upsetting to residents when memorial wreaths are left to deteriorate over
a period. Therefore, a paper will be brought to the appropriate committee with a suitable
recommendation for the sensitive and appropriate time for the removal of memorial
wreaths by Council colleagues”. 
2.26 At present the removal of wreaths is currently undertaken at the discretion of the service
and can vary depending on the severity of weather. Following observations of the
appearance of wreaths in late winter 2022 and early 2023, the service proposes that
armistice wreaths will be removed during the last two weeks of March across all
memorial sites. 
Biodiversity enhancement
2.24 To contribute to the council objective of management changes to enhance biodiversity
in cemeteries, the service proposes to trial wildflower sowing and naturalised
management in the oldest section of St Joseph’s cemetery and in edge areas not
suitable for lair space in Bothwellhaugh cemetery. The project will also consider other
nature recovery interventions such as bat and bird boxes. The project will start with
raising awareness amongst cemetery visitors of the proposals and working with
cemetery chargehands to identify the most appropriate areas and management
regimes. Care will also be taken to ensure onsite information is in place to explain the
management changes as they are implemented.  Full funding is available through the
Scottish Governments Nature Recovery funding. 
3. Measures of success
Page 201 of 366

Page 202

• Improvements in health and safety and management across all cemeteries. 
• Communities access a wider choice of burial options.
• Overall improvement in the appearance of cemeteries and memorials across
the North Lanarkshire area. 
Andrew McPherson
Chief Officer (Community Operations)
Page 202 of 366

Page 203

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The proposed charges will have an impact on income.  We have reviewed the
charges with finance and benchmarked against other authorities and anticipate the
changes will have a limited but positive impact on overall revenue costs
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
Legal Services have advised on the changes to the memorial masons registration
scheme and Management Rules and any impacts to the council
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Page 203 of 366

Page 204

Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The memorial inspection programme is part of the current Digital sprint in
Greenspace and digital solutions are being identified to improve the inspection and
remediation process 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Increased burial choice may reduce the demand for full lair burial which would have
an environmental benefit for land use.
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The updated management rules will be promoted through all channels.
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Progress on memorial remediation and forward planning has reduced a key service
risk.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
Page 204 of 366

Page 205

If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 205 of 366

Page 206

Page 206 of 366

Page 207

North Lanarkshire Council
Report
Environment and Climate Change 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  : AM Date 23/08/23 
Mission Zero for Transport 
From  Andrew McPherson, Chief Officer (Community Operations)  
E-mail mcphersona@northlan.gov.uk Telephone 07939 280467 
Executive Summary 
The Scottish Government has set an ambitious target for the country to reduce its
emissions by 75% by 2030 and to be net zero by 2045. Transport emissions are Scotland’s
single largest source of greenhouse gases, accounting for 36% of the total in 2018 and
only having reduced by 0.5% since 1990. Achieving net zero by 2045 will therefore require
a rapid reduction in these emissions. A key part of this will be encouraging residents to
make greater use of public transport, cycling and other forms of active travel and the
Council’s Active Travel Strategy will provide a pathway as to how this will be delivered in
North Lanarkshire. However, it must also be accepted that there will still be a reliance on
private vehicles and accordingly a wholesale shift to zero emission vehicles is also
necessary to meet the net zero goal. For this transformative shift towards net zero emission
vehicles to be successful, it must also be supported by a similarly rapid increase in the
overall electric vehicle charging infrastructure (EVCI).   
This report outlines how the Council will move its own fleet to zero emissions but also act
as a facilitator to allow our residents and businesses across the Council area to make a
similar shift and deliver on the local and national net zero ambition. It also fully supports
the ambitions within the Council’s Sustainable Futures Programme of Work. 
Recommendations 
It is recommended that Committee: 
1. Recognises the work already undertaken to rapidly improve the electric vehicle
charging infrastructure across North Lanarkshire and supports the proposed
actions to deliver a recommendation on the preferred option to deliver EVCI across
North Lanarkshire which will be brought back to the relevant committee for
approval. 
2. Recognises the demand for similar charging infrastructure across private fleets and
how the public sector can support this through our own strategy and expansion
plan. 
Item 6
Page 207 of 366

Page 208

1. Background 
1.1 The Scottish Climate Change Plan sets out ambitious targets for the country to be net
zero by 2045 with an interim position to reduce its emissions by 75% (from a 1990
baseline) by 2030. 
1.2 Transport emissions are Scotland’s single largest source of greenhouse gases,
accounting for 36% of the total in 2018 and they have only reduced by 0.5% since 1990. 
1.3 Scotland’s Mission Zero for Transport Strategy sets a target to reduce transport carbon
emissions by 56% by 2030 and to decarbonise completely by 2045. 
1.4 The Scottish and UK Governments’ policy is that no new petrol and diesel cars or vans
will be sold from 2030. The number of electric vehicle (EV) cars and light goods vehicles
licenced in Scotland increased from 500 in 2012 to almost 50,000 in 2022 with an
expectation that the number of EVs on Scotland’s roads could be anywhere from
500,000 to 1 million by 2030. The rate of this shift to zero emission vehicles will be in
direct relation to the available infrastructure and it is therefore vital that Scotland
expands the Electric Vehicle Charging Infrastructure (EVCI) network to meet the
growing demand for EVs. 
1.5 There is a further requirement on public bodies to be exemplars in this approach with
even more challenging targets set and summarised in the diagram below: 
3. Supports the approach taken to provide an outline of the costs and timeline
associated with the transformational shift of the Council’s fleet to net-zero. 
4. Supports the approach towards EVCI within our New Build and Hub Development
programmes. 
5. Supports the approach for the introduction of EVCI across our existing depot and
office buildings. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (17) Ensure we keep our environment clean, safe, and attractive
Page 208 of 366

Page 209

1.6 The main policy approach to expanding Scotland’s EVCI is set out in the Scottish
Government’s vision statement for the future of the EV charging network (March 2022).
The key requirements of this vision are: 
• People have access to a well-designed and comprehensive public network of
charge points.
• The public electric vehicle network works for everyone regardless of age,
health, income or other needs.
• Scotland has attracted private sector investment to grow the public electric
charging network, ensuring it meets the needs of all people.
• The public charging network is powered by clean, renewable energy and drivers
benefit from advancements in energy storage, smart tariffs and network design.
• People’s first choice wherever possible is active and public transport with the
location of electric vehicle charging points supporting those choices. 
1.7 To support local authorities to deliver an improved network of charging points, the
Scottish Government have established the Electric Vehicle Infrastructure Fund (EVIF).
The principle behind the EVIF is to maximise private sector investment in the expansion
of the EV network. 
1.8 The EVIF is administered through Transport Scotland with each local authority able to
utilise up to £140k to develop their own Strategy and Expansion Plans (SEPs).  Local
Authorities have been able to access £60k of this in 2022/23 and the remaining £80k
is available to assist in moving through procurement towards delivery. 
1.9 In addition, across Scotland there is a total of £25.52m that is available across all local
authorities for Capital Project Funding for the period 2022/23 to 2025/26.  There is no
formulaic distribution of this capital.  It was agreed by CoSLA that each local authority
would receive a minimum of £300k of capital funding over the four-year period of the
fund for new delivery models and the remaining amount (£15.6m approx) “will also be
based on an assessment of need identified by… Strategy and Expansion Plans”. 
1.9 To deliver on all of the above, the Council has established a Mission Zero for Transport
Group. The purpose of this group will be to agree the actions on how the Council will
move its own fleet to zero emissions in line with the above timeframe, but also act as a
facilitator to allow our residents and businesses across the Council area to make a
similar shift and deliver on the local and national net zero ambition. This report
summarises the work currently being progressed through this group and how it will
deliver on several key projects outlined within the Sustainable Futures Programme of
Work. 
2. Report 
Strategy and Expansion Plan for EVCI Across North Lanarkshire 
2.1 At present there are around 174 publicly available EV charging points within North
Lanarkshire and divided as described in Table 1 below: 
Page 209 of 366

Page 210

7kW 22kW Rapid 50kW Ultra Rapid
100kW+
Total
Council 26 52 25 0 103
Private 18 9 22 22 71
Total 44 61 47 22 174 
Table1: Current EV Charging Infrastructure within North Lanarkshire  
2.2 The number of electric vehicles currently within North Lanarkshire, and the expected
increase, can be summarised in Table 2 below: 
Total Registered
in 2022
Per 100K of
Population
Per 100K of
Population
by 2026
Per 100K by
2030
1093 584 2444 6487   
Table 2: Current and Predicted Levels of Electric Vehicles within North Lanarkshire 
2.3 It is clear therefore, that to match the expected and required increase in EV vehicles
there must also be a very rapid improvement in the overall supporting infrastructure. 
2.4 In response to this, and through the Glasgow City Region (GCR), Mott MacDonald
consultants were tasked with reviewing the current and expected demand for EV
vehicles and associated infrastructure across the GCR as a whole and within each of
the eight individual local authority areas. The purpose of this was to deliver a business
case as to how each individual local authority and/or the GCR could facilitate the
necessary investment in infrastructure that would be required over the next three to
four years. 
2.5 From the work undertaken by Mott MacDonald, the number of charging points across
North Lanarkshire has been estimated based on the knowledge that 58% of all housing
within the Council has access to off-street parking and the assumption that most
charging for these vehicles will be undertaken at home:  
2026 Forecast
Requirements
2030 Forecast
Requirements 
Low Central High Low Central High
Residential
(Slow)
280 481 830 454 857 1291
Destination
(Slow)
334 574 988 755 1438 2161
Destination
(Fast)
78 134 231 177 336 505
Rapid 72 127 229 199 406 611
Total Devices 764 1316 2278 1585 3037 4568  
Table 3 – Forecasted charging points required within North Lanarkshire.
Page 210 of 366

Page 211

2.6 The report also outlined proposed sites for delivery of the 1316 charging points based
on the following three principles: 
• Grid Connection – SPEN have been contacted and all site locations would be able
to be delivered from existing grid capacity but further discussion with SPEN
required.
• 99% of properties within 10-minute drive of charging point. Five-minute walking
catchments have been assumed to residential chargers where off-street parking is
limited to help deliver the ‘equitable’ and ‘usable’ objectives. 
• The proposed network supports the transport hierarchy through ensuring chargers
are provided in close proximity to active travel and public transport as potential
mobility hubs. 
2.7 The numbers detailed above include all chargers that will be required. This number
includes all existing chargers (174) those expected to be installed by independent
providers without any intervention by the public sector (248) with the remaining 894 to
be delivered as part of a public sector strategic approach. The costs to deliver the 894
chargers has been estimated at £12M. These costs also assume that the existing grid
capacity will be able to accommodate all the increased demand. Although Scottish
Power Energy Networks were consulted in the preparation of the report, there is no
guarantee that the current capacity will accommodate the proposed EVCI and
accordingly additional costs and time may need to be built in to address this issue, the
extent of which is currently unknown. 
2.8 Although outwith the scope of the EVIF, eight potential ultra rapid charging sites were
identified, all being a maximum of 1km from a main trunk road: 
• Main Street, Cumbernauld Village
• Broadwood Loch, Cumbernauld
• South Muirhead Rd, Cumbernauld
• Stepps Centre
• Drumpellier Country Park
• Strathclyde Park (x2)
• Glebe Street, Bellshill 
The above locations provide access off all the main trunk roads with the exception of
the M8 and this will be a consideration going forward. 
2.9 The above figures relate solely to North Lanarkshire and when combining all eight
authorities it is considered that the GCR will collectively require to secure significant
investment to deliver an overall increase to the existing network of 964 charge points,
to 8,798 charging points by 2026. It is estimated that 4,868 of these will have to be
supported through the public sector at an overall cost of approximately £71.5M. 
2.10 Through meetings of the GCR Chief Executive Group, it was agreed that all eight local
authorities would initially undertake a collaborative approach to determine how work
towards delivery of this overall expansion could proceed. This would be delivered
through a Senior Officer EV Group and supported by the GCR Electric Vehicle
Taskforce. 
2.11 There have now been several meetings of the Senior Officer Group which has resulted
in the issue of a PIN through the Public Contracts Scotland portal. The purpose of this
Page 211 of 366

Page 212

PIN is to enter a market engagement exercise with charge place operators (CPO) to
seek their views on how best to deliver the expansion of the infrastructure network in a
way that aligns with the requirements of the Scottish Government’s vision statement.
Returns on this PIN were received on the 7th July and at the time of writing this report,
several of the CPO’s have now been invited to further informal discussions which will
allow further consideration of the options available. Although not included within the
overall scope of the EVIF, consideration will also be given as to the provision of other
low emission fuels (most notably Hydrogen) and whether the introduction of ultra rapid
charging sites should also be included within the expansion plan. The PIN also asks
which solution would be provided to cover the back-office administration of charge
points which will be critical to ensure there is an appropriate solution in place following
the removal of the publicly funded Charge Place Scotland network in the spring of 2025. 
2.12 Running in parallel with the market engagement exercise, Mott MacDonald have been
tasked with providing a more detailed review of the potential delivery options that would
be open to the GCR/ individual authorities to consider: 
• Privately owned and operated model - lowest risk to local authority, but likely
to be coverage gaps and no influence on scope and tariffs.
• Privately operated model – with local authority receiving revenue stream
from lease of ground etc.
• Privately Operated with Risk Share – as above but with local authority
capital investment which could lead to increased revenue but greater risk.
• Public Sector Owned and Operated Model - fully publicly financed, owned,
operated and maintained network, allowing greatest degree of control by
local authority, but with need to finance capital and revenue costs and cover
all risks. 
2.13 The outcome from this report will summarise the comparative overall strengths,
weaknesses, risks, and opportunities of all models and provide a financial forecast for
both the capital and revenue spend and the projected net income. The financial
scenarios will also include a forecast for low, medium, and high uptake scenarios.
2.14  At present, the view of North Lanarkshire is that a concession model format is the most
preferred, but this is not a shared view across all local authorities within the GCR. It is
hoped that the information contained in the outcome from this report (expected late
July) will lead to a more unified approach. It should also be recognised that the Scottish
Government have made it clear that local authorities who choose to operate their own
charging scheme independent of any partnership arrangement with the private sector
will not be allowed access to the EVIF and will require to fund all capital costs from their
own solution. 
2.15 One of the key factors which will be considered by the Council as part of the overall
strategy, will be to ensure a ‘fair transition’ towards EV. We are all aware of the current
fuel poverty concerns, and key to the strategy will be to recognise that those areas of
North Lanarkshire who are not able to access home charging facilities are provided
with access to charging infrastructure which is at least comparable to that if they were
to charge at home. In the absence of this, we will only further exacerbate the ongoing
fuel poverty issue and place a significant barrier to many residents making the choice
to switch to a low emission vehicle. 
2.16 Following conclusion of all the above measures, and discussion amongst all eight local
authorities, a further report will be brought back to the relevant Committee outlining the
outcome and with a recommendation on how the Council should proceed to deliver on
Page 212 of 366

Page 213

its EV charging infrastructure strategy. It is expected this report will be presented
towards the end of this calendar year or early into the next. 
HGV and Fleet Vehicles 
2.17 At the same time as the SEP to deliver an increased charging network is being
undertaken, there is another element of work being completed to determine what
level of infrastructure would be required to deliver sufficient charging capacity for
business fleet vehicles across the city region. 
2.18 It is estimated that there are around 111,400 fleet vehicles in the GCR made up of
cars, taxis and private hire vehicles (42%), LGVs (40%), HGVs (9%), bus and coach
(3%) and other vehicles (6%). Fleet vehicles currently use and are predicted to
continue to use, a mix of depot based and non-depot-based charging and the
demand for publicly accessible charging points for private fleet vehicles has been
included within overall strategy and expansion plan for EVCI. 
2.19 By 2030, the total number of electric fleet vehicles in the GCR could be as high as
around 30,000 cars, taxis and LGVs and 3,800 HGVs, buses and coaches with the
following depot-based charging facilities: 
• Light Goods Vehicles – 5,350 (average of between 2,450 and 8,850)
• Heavy Goods Vehicles – 1,663 
2.20 Based on the above numbers, the cost estimates for the required depot based EVCI
for cars and LGVs could range between £75M and £129M depending on charger
type, with the costs for heavy goods vehicles estimated at around £163M. 
2.21 Although the public sector will not be responsible for delivery on the above, there is
an expectation that local authorities will play a role in helping to support fleet owners
and operators plan for the provision of depot-based charging. Some options identified
include: 
• As the likely drivers of local EVCI strategy, local authorities can consider how
they can include fleet EVCI demand as part of the overarching strategy,
particularly with regards to identifying grid capacity issues, overcoming
potential connection challenges and opportunities for cost savings.
• Identify Council owned land which could be leased by business for shared
depot charging.
• Establish a process for sharing charging infrastructure among fleet operators.
• Ensure some EVCI is accessible for LGVs. This includes the provision of
parking spaces which are of sufficient size to enable an LGV to access the
space and charge their vehicles.
• Provide EVCI in locations easily accessible to fleet vehicles, for example with
easy access to the main road network. 
2.22 Although the requirement for depot charging facilities is not included within the scope
of the strategy and expansion plan for EVCI, the two are not mutually exclusive and
when considering the final model, consideration will be given as to how this model
can support the net zero ambition of private fleets. 
Decarbonising the Council Fleet 
2.23 At present the Council has around 610 vehicles split into the following categories:
Page 213 of 366

Page 214

Vehicle Type   Total number  
Cars  230
Light Goods Vehicles  229
Heavy Goods Vehicles  80
Passenger vehicles  57
Other  14
Total 610 
2.24 The Fleet Service has now adopted a three-stage approach towards the
transformational shift of the Council’s fleet to net zero: 
• The first stage involved the service securing £50K in funding from Transport
Scotland’s Fleet Pathfinder fund. This allowed the employment of consultants
(Jacobs UK Ltd) who have provided a report indicating options on which vehicles
could move to which low emission fuel and within which timescale. The outcome
from this report has shown that it would be possible to make this shift (to a
predominantly EV solution) within a five-year period, but at a current vehicle cost
anywhere between £62.6M and £81.2M – providing that delivery times for
vehicles were achievable and appropriate funding available. Discussions have
also taken place with several vehicle suppliers to further clarify delivery timelines
and price points. 
• The second stage involved engaging with the Scottish Government’s Hydrogen
Accelerator team who agreed to review the report received from Jacobs. The
outcome from this was general agreement, but at the present time, there was still
too much technical and financial uncertainty involved in whole scale change of our
HGV fleet. Consequently, the Council will now move to replace all LGV fleet to
electric but pause on any final decision with HGV as the risk associated with
pursuing a single option at present is too great a financial and operational risk.
Although we will continue to purchase predominantly diesel HGV engines in the
next 3 to 5 years this will be based on two conditions: 
o That the HGV fleet will as far as possible, transfer to Hydrotreated
Vegetable Oil (HVO) fuel. HVO is a fossil-free paraffinic diesel, meaning it
can be used as a direct replacement for mineral diesel fuel. Made from
certified waste materials, HVO therefore supports the circular economy
and helps to reduce emissions by up to 90%. The cost of HVO is on a par
with diesel.
o Where funding and opportunity allows, we will also trial/ start to introduce
EV and Hydrogen options for the HGV fleet. 
• The third stage will now involve more detailed discussions with fleet suppliers and
potential funding streams to further refine costs which will then allow a more
accurate assessment which can be included within the forthcoming bid for the
council’s five-year capital programme later this year. 
2.25  The process outlined above will provide a clear audit trail as to the rationale behind
the decision to proceed with certain vehicle purchases and any financial limitation
which has prevented the council from delivering on the targets set for the public
sector by the Scottish Government.
Page 214 of 366

Page 215

Future Proofing New Build 
2.26 Integrated within the council’s New Build and Hub Development programmes as part
of the Transforming Places programme of work, is a commitment to future proof all new
developments to allow the creation of immediate EV charging capacity but also the
infrastructure to support further expansion: 
• As a minimum, future hubs currently allow for compliance with the new
Building Regulations which came into force on the 5th June - 10% of total
parking provided with a charging facility and 50% ducting to remaining spaces.
(These projects include: Orbiston CH, St Kevin’s CH, St Stephen’s CH and
Gartcosh CH all of which will open between 2025 and 2026). 
• All new individual houses with driveways are now provided with an integrated
charging facility.
• For communal properties, parking facilities are provided with the appropriate
number of charging pillars to comply with the new Building Regulations. At
present there are 32 charging pillars providing 64 charging facilities.
• All communal charging points described above will be listed on Charge Place
Scotland. 
2.27 The above charging strategy will be kept under review to ensure it is reflective of best
practice. 
Existing Depot and Office Facilities 
2.28 In addition to the public charging infrastructure, the Fleet Service is now undertaking a
review of the location of all fleet vehicles relative to their base location. This exercise is
being done in partnership with Transport Scotland and the Energy Savings Trust. The
outcome from this exercise will allow the number of charging points for each location
to be identified to ensure that sufficient capacity will be available to allow the transition
of all vehicles to electric. This assessment will also include the grid capacity available
and whether additional substation provision would be required. 
2.29 Although the depot facilities may have to be restricted for Council use only, the number
of charging facilities at office locations such as the Civic Centre, Dalziel House etc will
also be maximised so that on top of the provision for our own fleet, additional facilities
are introduced to allow public charging also. This additional capacity would be included
within the overall increase required as part of the strategic and expansion plan for the
North Lanarkshire area. 
2.30 We are expecting to receive confirmation of the number of charging points required for
the Council fleet later this year which will allow for inclusion in the capital funding bid
process and accessing funding through the EVIF. 
Active Travel Strategy 
2.31 As detailed within the Scottish Government’s vision statement for the future of the EV
charging network, people’s first choice wherever possible must still be active and public
transport. As a consequence, it will be important to ensure that both the planning of
and investment in public electric vehicle charging infrastructure is undertaken in a way
that considers the wider sustainable transport system and supports, integrates and
aligns with our own Active Travel Strategy. 
Page 215 of 366

Page 216

2.32 This commitment will also be integral to the development of the Town and Community
Hub programme and the upgrading of our existing office and depot assets. Appropriate
facilities to support active travel will be part of the design for such facilities and will
include shower facilities, charging for E-bikes etc. so these destination points fully
support the principles of the active travel strategy and connectivity across our towns
and villages. 
3. Measures of success 
3.1  The delivery of electric vehicle charging infrastructure across North Lanarkshire which
allows the transformative shift to net zero emission vehicles which in turn will contribute
to delivery of the council’s net zero ambition.   
Andrew McPherson
Chief Officer (Community Operations) 
Page 216 of 366

Page 217

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
At present there are no financial impacts associated with this paper, however, as
detailed in the paper, more detailed conversation will need to take place to
determine the financial model associated with any concession contract and the
capital funding that may be required to deliver on the model and to transition the
council fleet to net zero. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
Nothing at present, but there will be a requirement to seek legal advice, the extent
of which will be determined on the type of model pursued by the council to deliver
its EVCI. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Page 217 of 366

Page 218

Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Along with the legal requirement, the transition to net zero vehicles will contribute
significantly to the net zero ambition for North Lanarkshire. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
None at present but the risks associated with the various EVCI delivery models will
require assessment and will be included in any decision-making process. An
appropriate risk-based approach has also been introduced in considering the future
of the Council’s HGV fleet. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact
Page 218 of 366

Page 219

Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 219 of 366

Page 220

Page 220 of 366

Page 221

North Lanarkshire Council
Report
Environment & Climate Change Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    AM/PB Date 23/08/23 
Business Regulation Service Plan 2023-2024 
From  Andrew McPherson, Chief Officer (Community Operations)  
E-mail mcphersona@northlan.gov.uk    Telephone  07939 280467 
1. Background 
1.1 The Business Regulation Service is a subset of Protective Services and is
responsible for the delivery of the statutory enforcement and advisory service for: 
• Food law in all food establishments within North Lanarkshire; and
Executive Summary
All local authority regulators of food law and occupational health & safety law must plan
their enforcement and advisory activities and, in accordance with independent auditor
preference, present that plan before a relevant committee for its approval. 
The report provides a summary of the service plan for the Council’s Business Regulation
service which fulfils the Council’s obligations relevant to food and health and safety law.   
A full copy of the Service Plan is enclosed at Appendix 1.
Recommendations
It is recommended that the Environment & Climate Change Committee: 
1. Approve the Business Regulation Service Plan 2023-2024. 
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (14) Ensure the highest standards of public protection
Item 7
Page 221 of 366

Page 222

• Occupational health & safety law in those premises within North Lanarkshire for
which they have an enforcement role (health and safety enforcement within
premises being split between local authorities and the Health and Safety
Executive (HSE) depending on the nature of the business). 
1.2 The Service is required to prepare an annual plan which clearly maps out specific
aims and objectives for the financial year.   
1.3 Food Standards Scotland (FSS) advocates that transparency is best achieved by
seeking and obtaining the approval of elected members.  FSS is independent of
national government and has the primary objective of protecting the health and other
interests of consumers in relation to all food issues.   
1.4 HSE’s National Local Authority Enforcement Code requires us to be accountable to the
public and businesses for our actions.  This can be achieved by publication of our
Service Plan. 
1.5 A copy of the Service Plan is attached as Appendix 1. 
2. Report 
2.1 Food Law Code of Practice Recovery Plan 
2.1.1 FSS granted dispensation to local authorities to deviate from their annual food
inspection plans from 30/03/2020 due to the restrictions imposed during the Covid
pandemic, and to enable re-tasking of officers to undertake wider public health duties
related to Coronavirus legislation.  The dispensation ended on 31/08/2021. 
2.1.2 During this financial year we will continue to implement the inspection recovery plan,
from year 2 into year 3 of the 5-year rolling plan.  We have undertaken extensive risk
rating and forward planning to ensure that FSS remain satisfied that we are adopting
an appropriate recovery plan to ensure that all premises receive the required
inspection visits within a practicable and programmed timeframe. 
2.2 Food Law Performance Targets 
2.2.1 The Service Plan details resources and targets for inspections and interventions in
respect of food law, including:
• Achieving a target of at least 75% of all our programmed food law inspections
within agreed timeframes.  This is an increase on last years’ target which was
set at 70%. 
• Ensuring at least 80% of our food business operators’ premises achieve a
‘Pass’ status in accordance with the national Food Hygiene Information
Scheme (FHIS). This is an increase on last years’ target which was set at
70%.  
• Commence investigation of 90% of food complaints within 2 working days of
receipt.
• Maintain a target of at least 94% of infectious disease cases being responded
to in accordance with the NHS Lanarkshire Epidemiological Investigation
Protocol. 
• Respond to at least 93% of high-risk requests for assistance/advice within 2
working days of receipt. 
• Respond to at least 93% of low-risk requests for assistance/advice within 5
working days of receipt.
Page 222 of 366

Page 223

2.2.2 An important principle of the Food Law Rating Scheme (FLRS) is to allow local
authorities to target resources on high risk and non-compliant businesses.  The Food
Law Intervention scheme rating is based upon a recent food business performance
model that targets resources on high to medium risk and non-compliant businesses. 
This impacts upon the frequency of inspection of food establishments for both
hygiene and standards components of a ‘food law’ inspection.  The FLRS takes
account of a food business operator’s track record of compliance and where this is
good, they will receive ‘earned recognition’ influencing the risk rating to reduce the
frequency of inspections.  This will assist resources to be targeted towards non-
compliant businesses which will be subject to more frequent inspections and potential
enforcement activity. 
2.3 Occupational Health and Safety Law 
2.3.1 The HSE’s national Local Authority Enforcement Code sets out a risk-based
approach to targeting occupational health and safety interventions to be followed by
local authority regulators.  A key component is to ensure that appropriate
interventions are focussed on specified high-risk sectors. 
2.3.2 In accordance with the national code, the Service will continue to respond to requests
for advice, investigate complaints, accidents, dangerous occurrences and other
incidents reported to us and we will undertake appropriate interventions, particularly
relevant to North Lanarkshire, wherever possible. 
2.3.3 The Service Plan details activities which are planned throughout the financial year in
respect of occupational health and safety matters. 
2.3.4 Additional projects may also be added where appropriate, having been highlighted by
the HSE, regionally by the West of Scotland Health & Safety Liaison Group or through
local intelligence, complaint, notification or other direct referral to the Service. 
3. Measures of success 
3.1 Performance is monitored in a several ways including on a quarterly basis by the 
Protective Services Management Team (PSMT).  If under performance or deviation is
identified, corrective action is promptly implemented. 
3.2 Performance outcomes for all participant food businesses in respect of the ‘pass’ and 
‘improvement required’ standard stipulated in the national Food Hygiene Information 
Scheme (FHIS) are reported locally to populate key performance indicator 
requirements. These are published on North Lanarkshire Council’s website and
returned separately to FSS.  
3.3 The quality of the performance and professional conduct of the Council’s 
enforcement personnel during inspections of businesses (both food and non-food
based) has been monitored, in part, using post-intervention customer service
questionnaires, in which service recipients are encouraged to provide their appraisal
of the standard of service delivered.  We are implementing these questionnaires
again in 2023-2024.     
4. Supporting documentation 
4.1 Appendix 1 - Business Regulation Service Plan 2023-2024. 
Page 223 of 366

Page 224

Andrew McPherson
Chief Officer (Community Operations)
5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Page 224 of 366

Page 225

Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Page 225 of 366

Page 226

5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 226 of 366

Page 227

food safety/occupational health & safety service plan 2023/2024  1 
Community Operations 
Protective Services 
(Business Regulation Service) 
Food Safety/Occupational Health & Safety
Service Plan 2023/2024 
STATUTORY AND GENERAL OBLIGATIONS ON FOOD AUTHORITIES 
Page 227 of 366

Page 228

food safety/occupational health & safety service plan 2023/2024  2 
Legal Obligation on Food Authority 
Compliance with statutory guidance ‘Food Law Code of Practice (Scotland) 2019’ (the Code) and ‘Interventions Food
Law Code of Practice (Scotland) 2019’ (the Interventions Code) is an important requirement to safeguard and ensure
proper and consistent administration of food law across Scotland. 
In delivery of Official Food Controls, North Lanarkshire Council is legally required to ensure: 
a. The effectiveness and appropriateness of Official Controls. 
b. That controls are applied at an appropriate risk-based frequency. 
c. That there are a sufficient number of suitably qualified and experienced competent staff and adequate facilities
and equipment to carry out duties properly. 
d. That staff are free from conflicts of interest. 
e. That there is access to an adequate laboratory capacity and capability for testing. 
Food Standards Scotland (FSS) seeks to work in partnership with Local Authorities to help them deliver on official
control policies and Codes, and to assist them in implementing the Codes. 
Effects of Failure to Comply with these Statutory Obligations 
Section 40(2)(a) of the Food Safety Act 1990 requires a local authority to have regard to the relevant provisions of
the Codes.  Section 40(3) allows FSS to consult Scottish Ministers in relation to non-compliance with the Codes to
order the issue of a direction to a local authority requiring it to take steps to comply with the Codes.  Failure to
comply with a ministerial direction by a local authority may be sanctioned by order of the Court of Session.  Where
Scottish Ministers are satisfied that a Food Authority has failed to discharge any duty imposed by or under the Act,
where that failure affects the general interests of consumers of food, they may by order empower another Food
Authority or officer of the Ministers to discharge that duty in place of the Authority in default, and recover costs from
the defaulting Authority. 
Requirement to Prepare an Annual Service Plan 
Each Food Authority should complete an Annual Service Plan which details the Interventions programme for the
coming year.  They should ensure such a programme is adequately resourced and that the overall plan is subject to
approval timeously at the appropriate governance level within the Local Authority. 
The Service Plan should include: -
• A statement in relation to the Food Authority’s approach or policy on Interventions, Enforcement, and
Service Delivery. 
• A Food Authority’s approach to Interventions out-of-hours.
• Details on how new Food Business Establishments are to be included in the Authority’s planned Intervention
Programme.
• Effective routine sampling. 
• Strategies for maintaining surveillance of “low-risk” establishments where the LA has decided these will be
subjected to alternative enforcement strategies in either their Food Service Plan or Enforcement Policy. 
The Service Plan or Enforcement Policy should include: -
Page 228 of 366

Page 229

food safety/occupational health & safety service plan 2023/2024  3 
• The Food Authority’s approach to revisits and enforcement action - North Lanarkshire’s approach to
enforcement is included within the Enforcement Policy.  Its approach to revisits and enforcement action is
incorporated within Food Policies and Standard Operating Procedures (SOPs) which are an extension of the
Enforcement Policy.
• Strategies for maintaining surveillance of “low-risk” establishments where the LA has decided these will be
subjected to alternative enforcement strategies in either their Food Service Plan or Enforcement Policy.  
North Lanarkshire has included these within both the Service Plan and the Interventions SOP which are an
extension of the Enforcement Policy. 
The Interventions Programme should include: -
• The Food Business Establishment profile.
• The number of Interventions programmed.
• An estimate of the number of revisits that will be made.
• An estimation of resources required. 
• Resource for new businesses.
• Detail any targeted Intervention activity that the Food Authority intends to carry out including any extra
resources this may require. 
• Identification of any priorities relating to nationally or locally driven outcomes, such as compliance with new
legislation or improved compliance with existing legislation and other central government initiatives,
including compliance with the Food Law Code of Practice (Scotland) 2019 and the Interventions Food Law
Code of Practice (Scotland) 2019. 
SECTION 1: SERVICE AIMS AND OBJECTIVES 
1.1 Aims and Objectives 
North Lanarkshire Council is committed to delivering customer excellence for all its service users to maximise the
benefits of North Lanarkshire’s geographical location, creating prosperity, achieving social justice and fulfilling local
needs by providing best value. 
The following aims and objectives have been identified as being fundamental to this process. 
1. To place the safety, health and well-being of the employed and the general public foremost. 
2. To protect public health and affirm the continuing commitment to assist businesses in their recovery from the
pandemic. 
3. To inspect businesses for food law and/or health and safety law compliance within at least the minimum targets
which have been set for inspection purposes and ensure that a proportionate and consistent enforcement policy
is adhered to. 
4. To commit to the national Regulators’ Code for reserved matters and the Scottish Regulators’ Strategic Code of
Practice for devolved matters. 
5. To undertake a programme of effective routine food sampling to ensure that food is of the nature, quality and
substance demanded by the public and to take appropriate action to remove any unsatisfactory foodstuffs
identified during this process. 
6. To respond appropriately to relevant food alerts as required by FSS. 
7. To investigate food complaints and report to the Crown, recommending that they initiate legal proceedings
where this is deemed to be in the public interest. 
Page 229 of 366

Page 230

food safety/occupational health & safety service plan 2023/2024  4 
8. To offer free advice and guidance to the public, voluntary organisations and the food and health & safety
businesses within North Lanarkshire for the purposes of achieving compliance with statutory requirements and
assisting in developing and promoting competence in food and workplace health & safety awareness. 
9. To prepare reports and other related data for other Services within the Authority, FSS, the Health & Safety
Executive (HSE) and other relevant Agencies to demonstrate transparency, ensure compliance with legislation
and to provide a coordinated approach to food safety and health & safety related matters. 
10. To investigate instances of food and water borne diseases within North Lanarkshire in a coordinated approach
with the relevant Health Authorities. 
11. To fully and promptly investigate notifications of work-related accidents, dangerous occurrences and ill health
and take enforcement action in accordance with guidance to prevent harm and secure justice, where
appropriate. 
12. To respond promptly and courteously to requests for assistance and commit to the delivery of customer service
excellence for all our service users. 
13. To aim to deliver public confidence in the way food safety and health & safety issues are monitored and enforced
within North Lanarkshire. 
14. To respond appropriately and effectively to public health emergencies which impact on public safety. 
1.2 Links to Corporate Ambition Statements and Priorities 
This Operational Plan is linked with the Protective Services Operational Plan and is made in accordance with
aspirations and objectives contained within the Plan for North Lanarkshire. 
For example, from The Plan for North Lanarkshire: 
‘Improve economic opportunities and outcomes’ 
The growth and sustainability of local business is actively supported.  Working in partnership with Business Gateway,
we offer a comprehensive and free consultancy service to start-up, fledgling and mature businesses to help with
legal compliance in relation to food safety and, where appropriate, occupational health & safety legislation.  (This
was stood down due to the pandemic, but we will resume liaison as part of business recovery.) 
‘Improve the health and wellbeing of communities’ 
In accordance with the Interventions Food Law Code of Practice (Scotland) 2019, formal, unannounced inspections of
North Lanarkshire’s food businesses are undertaken to ensure operators make or sell foods which meet
compositional and declaration legal standards, are safe to eat and will not cause illness or disease.  Where food
businesses are found operating unsafely, they may be compulsorily closed or prohibited from undertaking specific
activities to safeguard public health, reported to the Crown and the unfit foods seized for destruction (as
appropriate).  The only food businesses which would not be subjected to proactive inspections are low risk Group 3
Band A premises which, following initial or subsequent intervention or where the food registration form gives
sufficient information to make determination that there is minimal inherent risk, and the Lead Food Officer
determines either to place the business on a 60 month intervention frequency or choose not to undertake a
proactive intervention. 
We respond quickly to consumer concerns about food business operators, whether that is the condition of their
premises, the state of the food products or the malpractices allegedly conducted there.
Page 230 of 366

Page 231

food safety/occupational health & safety service plan 2023/2024  5 
The Service investigates outbreaks of infectious disease in conjunction with NHS Lanarkshire and acts over concerns
of poor public or private water supplies.  The Service implements a monitoring programme for private water supplies
and undertakes risk assessments, where applicable, in relation to water introduced into, and supplied through and
from, each private water supply system to premises in its area, to establish if there is any risk that the water could
pose a potential danger to human health. 
A similar service exists for occupational health & safety where the local authority is the relevant enforcement body. 
During the pandemic, the Service took on an advisory and enforcement role in terms of Coronavirus related
Regulations to prohibit certain businesses from opening, and to ensure that social distancing arrangements and other
mitigations were in place for businesses that were allowed to continue to trade under restricted conditions.   This role
included business compliance visits and outbreak investigations.  Whilst restrictions are no longer in place, there may
be a future ask from the Service in respect of Pandemics. 
Plan for North Lanarkshire 
The Plan for North Lanarkshire identifies 25 high level ambition statements aligned into five priorities and the
Business Regulation’s Food Safety /Occupational Health & Safety Service Plan links with these priorities as follows: 
Improve the health and wellbeing of communities 
• Programme of targeted interventions to determine compliance with statutory requirements along with
proportionate enforcement action, as required.
• A commitment to the prevention of death, injury and ill health arising out of or in connection with a work
activity.
• Food sampling programme.
• Partnership working with NHS Lanarkshire to locate the source and prevent the further spread of infection.
• Focusing on specific health & safety issues.
• Working in partnership with NHS Lanarkshire, FSS, the HSE and other agencies to promote and deliver health
improvements for the employed within North Lanarkshire and its citizens. 
Improve North Lanarkshire’s Resource Base 
• Provision of food safety literature and correspondence in a range of ethnic minority languages along with
access to interpreters to promote social inclusion.
• Updating and maintaining enforcement officer competence. 
• FHIS (Food Hygiene Information Scheme).
• Online publication of food law intervention letters and of register of notices served under The Food Hygiene
(Scotland) Regulations 2006, Regulations 6 to 9 and the Health and Safety at Work etc. Act 1974, Sections 21
and 22.
• OHSAS 45001 (the occupational health and safety management standard).
• APSE (Authority Public Service Excellence). 
Business Regulation regards high quality public service as its key value and this commitment is reflected in that the
Service achieved OHSAS 45001 accreditation. ISO 9001 quality standards adherence is monitored internally. 
Key food safety and health & safety policies and procedures are within scope of an ISO 9001: 2008 compliant Quality
System and are periodically reviewed to reflect procedural changes. 
Business Regulation aims to support and work alongside various organisations including FSS, HSE, Police Scotland,
Scottish Fire & Rescue, NHS Lanarkshire and Health Protection Scotland to deliver common objectives which prevent
or mitigate against illness, disease or injury and to deliver better health outcomes for residents, consumers and
employees by sharing  and promoting best practice for food safety, public health and occupational health & safety
Page 231 of 366

Page 232

food safety/occupational health & safety service plan 2023/2024  6 
interventions. Where appropriate we will link service provision to any national and local updated plans and strategies
relevant to the recovery process post pandemic. 
SECTION 2: BACKGROUND 
2.1 Profile of the Local Authority 
North Lanarkshire is the 4th largest authority in Scotland with a population of 341,140 and an area of 47,222 hectares
(2021). It is situated approximately halfway between the cities of Glasgow and Edinburgh and many of its residents
live in the six main towns of Airdrie, Coatbridge, Cumbernauld, Bellshill, Wishaw and Motherwell. 
North Lanarkshire is in the midst of a process of major social, economic and environmental change.  This has required
a process of regeneration which is perhaps best illustrated in the Ravenscraig initiative whereby work is now
proceeding with large commercial and residential developments on the former steelwork’s site. 
This process of economic re-generation will continue and is greatly assisted by the strategic location of North
Lanarkshire with regard to links to the South via the M73 and M74 and to Glasgow and Edinburgh via the A8/M8
motorways. Extensive improvements to the local motorway network and various arterial roads, recently completed,
following a massive infrastructure investment and upgrade.
Page 232 of 366

Page 233

food safety/occupational health & safety service plan 2023/2024  7 
Here is a plan of North Lanarkshire Council’s catchment zone. 
Page 233 of 366

Page 234

food safety/occupational health & safety service plan 2023/2024  8 
2.2 Organisational Structure 
The configuration of the Business Regulation Service for 2023/2024 (at June 2023). 
Chief Officer 
(Community Operations) 
Protective Services Manager
(Responsibilities include Business
Regulation, Pollution Control & Public
Health and Trading Standards)
Assistant Business Manager
(Business Regulation) 
Senior EHO (North) 
North Division  
4.5 X FTE EHOs
+
1 vacant FSO/EHO Post 
South Division 
5 X FTE EHOs
+
1 X FTE FSO 
Senior EHO (South)  Senior EHO (Central) 
Central Division 
5 X FTE EHOs 
Page 234 of 366

Page 235

food safety/occupational health & safety service plan 2023/2024  9 
2.3 Scope of the Business Regulation Service 
The services which are provided include: - 
• Advice/Guidance to the Private Sector/Voluntary Groups as well as to business.
• Compilation of Performance Indicator Data (e.g., NLC PI data, LAE1, FSS Audit returns etc.).
• Disposal/Seizure of Unfit Foodstuffs.
• Eat Safe Initiative.
• Export Health Certificates.
• Attestations & Food Premises Compliance Certificates for Export.
• Food Law Interventions.
• Food Safety Alerts.
• Food Safety/Health & Safety Promotional Initiatives.
• Approval of Premises under Regulation EC No 853/2004.
• Food Hygiene and Food Standards Inspections of Premises Approved under EC No 853/2004 and of Primary 
Producers 
• Food Standards Inspections of Meat Plants Approved under EC No 853/2004 by FSS
• Formal/Informal Food Sampling.
• Frequent Liaison with FSS and NHS Lanarkshire Public Health.
• Health & Safety Interventions.
• Healthy Living Awards.
• Originating Authority Responsibilities.
• Infectious Disease Investigations.
• Enforcement within Skin Tanning Premises.
• Investigation of Complaints Regarding Workplaces.
• Investigation of Food Complaints.
• Investigation of Workplace Accidents, Dangerous Occurrences and Occupational Ill Health.
• Licensing and Inspection of Skin Piercing & Tattooing Premises.
• Licensing of Venison Dealers
• Monitoring of Compliance with the National Tobacco Smoking Ban in Public Places.
• Precognition/Reports to the Crown Office & Procurator Fiscal Service.
• Private Water Supply Register, Risk Assessments, Sampling, Grant Assistance & Water Scarcity.
• Promoting Healthier Food in Catering.
• Public Mains Water Sampling.
• Reports to Licensing Boards.
• Representation on the Official Control Verification Working Group.
• Representation on the West of Scotland Health & Safety Liaison Group.
• Representation on West of Scotland Food Liaison Group.
• Representative on the Review of the Scottish Waterborne Hazard Plan.
• Responses to Building Warrants and Planning Enquiries.
• Shared maintenance of the FHIS Website at a local input level.
• Work in Partnership with the HSE on National Campaigns & Initiatives.
• Shared maintenance of Scottish National Database (SND) at local input level.
• Advisory and enforcement role in respect of Pandemic legislation, including business compliance visits and 
outbreak investigations.  
Chemical analysis and microbiological examination of food samples is undertaken by Glasgow Scientific Services
(GSS) on behalf of the Service. 
Page 235 of 366

Page 236

food safety/occupational health & safety service plan 2023/2024  10 
The Service has access to translation services for documentary purposes and to facilitate routine inspections and
other food and health and safety enquiries where this is required. 
The approach to the Interventions Food Law Code of Practice (Scotland) 2019 (the Interventions Code) and the Food
Law Code of Practice (Scotland) 2019 (the Code) focuses predominantly on intervention and audit of premiss to the 4
Es approach of Engage, Explain, Encourage and Enforce. 
There was a significant resource dedicated to dealing with COVID-19 related complaints, where authorised officers
carrying out food law interventions also have responsibility for inspection of premises under health and safety
legislation, as well as outbreak investigations and close working undertaken with NHS Lanarkshire Public Health Teams.
Assistance was also provided to other Services, including Education, Social Work, Facilities Support, Transport and
Internal Health and Safety to assist with outbreaks within Council run establishments, as well as assistance to partners
such as the HSE.   
Premises inspections provisionally resumed on 1 September 2021 following Desktop Transfer and the revised
Intervention Programme.   For performance monitoring and reporting purposes the Intervention Programme Start
Date for North Lanarkshire was 1 October 2021 to keep all quarterly reports aligned with normal Service planning and
reporting.  The revised intervention due date determined from the anticipated Intervention Programme Start Date
was uploaded onto the Service’s Management Information System (MIS) for performance monitoring purposes. 
Feed issues are dealt with exclusively by FSS. 
Our Service headquarters is based at Civic Centre, Windmillhill Street, Motherwell ML1 1AB.   
2.4 Demands on the Business Regulation Service 
Food establishments are grouped as 1 to 3 depending on the nature of the food business, with Group 1 businesses
including e.g. manufacturers of high risk foods down to Group 3 businesses including licensed premises not providing
catering.  Within each of the groups the food establishment is risk rated in Bands A to E, dependent upon the
business performance and compliance, with Band A being sustained compliance and E being sustained non-
compliance and/or issues of public health significance or fraudulent activity. 
The data relating to the food premises profile is in the following tables. 
Page 236 of 366

Page 237

food safety/occupational health & safety service plan 2023/2024  11 
Food Law Business Groups and Risk Ratings
1A 34
1B 12
1C 3
1D 0
1E 0
Awaiting Inspection 2
Food Standards Only* 4 
Total 55  
2A 141
2B 942
2C 404
2D 9
2E 1
Awaiting Inspection                                                                    58
Total 1555  
3A 111
3B 781
3C 126
3D 0
3E 0
Awaiting Inspection 20 
Total 1038  
Total  2,648  
SND Category & Premises Count  
Primary Producers 20
Manufacturers & Packers 78
Importers 0
Distributors/Transporters 68
Retailers 439
Supermarket/Hypermarket  64
Small Retailer 10
Retailer-Other 8
Restaurant &Caterers 217
Restaurant/Café/Canteen 199
Restaurant/Caterer-
Others
609
Hotel & Guest house    33
Pub/Club 229
Takeaway 442
Caring Premises 53
School/College 144
Mobile Food Unit 
Other
154
0
Total 2,767
Note:   Food Standards Only*-Included within the figures above are 4 meat plants which are approved by FSS but for
which we enforce Food Standards legislation.
Page 237 of 366

Page 238

food safety/occupational health & safety service plan 2023/2024  12 
In addition to numbers referenced within the Food Law Business Groups and Risk Ratings table above, there are:
• 19 separate establishments currently approved under EC Regulations;
• 15 primary producers (dairy farms)
• 7 Premises ungrouped awaiting inspection.
• 189 Premises on our MIS without Food Law Intervention Codes 
Our Management Information System is a live system with information being automatically uploaded to SND on a
weekly basis, which accounts for some disparity in totals.  FSS undertook a project which was aimed at identifying
and resolving data accuracy and quality issues between LA MIS and SND. We are currently undertaking a
housekeeping exercise of our MIS as have identified 189 premises without Food Law Intervention Codes. A number
of these will be duplicate premises, but there are some which aren’t and will result in additional interventions being
programmed in throughout the year. An exercise is already underway to identify which of these premises are not
duplicates so they can be included in the intervention programme. 
We have approximately 3,500 businesses at present for which we have responsibility for the enforcement of
occupational health & safety law. 
The new Food Law Rating System (FLRS) ensures that the profile of food standards is raised whilst reducing
duplication and bureaucracy caused by two inspection regimes.  Importantly, Local Authorities can target resources
on high risk and non-compliant businesses.  Even as an early adopter, the pause in intervention programme brought
about by the pandemic meant that not all premises within North Lanarkshire had undergone a food law intervention,
and as such had not been banded.  We changed from Annex 5 rating scheme to the FLRS based on guidance provided
by the Scottish Food Law Enforcement Committee (SFELC) COVID-19 Recovery  Working Group using a formula based
on Annex 5 food hygiene scores for hygiene, structure and confidence in management alone, as it was assessed that
a number of the other elements previously contained in Annex 5 had been taken into account at the ‘Group’ stage,
and that confidence in management scores were, in the vast majority of cases, consistent between food hygiene and
food standards scoring systems.  In order to ensure, however, that food standards were given an appropriate level of
consideration during the desktop transfer, at the end of the process we conducted a final check to ensure that any
establishment which had previously been given a poor rating for ‘Level of Compliance’ in Annex 5 Food Standards 
Scoring System would be given a ‘Band D’ in FLRS.  Within NL, none were identified.  Whilst this exercise had a
significant impact on officer time, it assisted in identifying priorities for the food law recovery process. 
One of the Key Performance Indicators for the Service is the percentage of food establishments which achieve the
Food Hygiene Information Scheme (FHIS) ‘Pass Award’.  Our target for 2019/20 was set at 90%, with an overall rate
achieved of 94.09%.  It was anticipated there will be a greater number of Improvements Required due to the pause
in programmed interventions due to the COVID-19 pandemic and the authorised deviation from the Code from 30
March 2020 to 31 August 2021.  Our target for 2022/23 was set at 70%, with an overall rate of 94.8%. Our target for
2023/24 has been set at 80%   
Our normal business hours are 08.45am to 16.45pm, Monday to Thursday with a 16.15pm closure on Friday.
However, a standby service is available to respond to emergencies including Food Alerts For Action (FAFA), outwith
normal business hours. 
EU exit impacted on the Service due to preparation for food exports and in particular fish exports to the EU.  Further
detail is provided on this in Section 3.9 ‘’EU Exit’’. 
2.5 Enforcement Policy 
North Lanarkshire Council has a documented enforcement policy which was approved by Elected Members at the
Infrastructure Committee in September 2018 and is available on the NLC website to businesses and consumers.  The
policy was updated to reflect: -
• Changes in legislation;
Page 238 of 366

Page 239

food safety/occupational health & safety service plan 2023/2024  13 
• The effect of the Scottish Regulators’ Strategic Code of Practice (SRSCoP) on food safety matters;
• Due regard to the general principles of the Regulators' Compliance Code in respect of health and safety
matters;
• Advice issued by Food Standards Scotland (FSS) and the HSE; and 
• Relevant provisions of the Code for Crown Prosecutors. 
The enforcement policy is subject to further review (pending). 
All Authorised Officers with responsibility for inspecting premises and/or dealing with other food and health and
safety issues are aware of the enforcement policy.  Authorised Officers are also aware that it is the Council’s policy to
offer advice where this is appropriate or requested, particularly in regard to small and medium sized businesses. 
Arrangements will be made to inspect and register any food premises found to be trading but which have not
registered with the Authority.  It will not normally be the policy of the Authority to submit a report to the Crown
regarding failure to register alone unless a food business operator habitually refuses to do so or in combination with
the discovery of unregistered premises in a serious state of non-compliance with food law. 
The enforcement policy for Council operated food businesses will be as detailed within the Food Law Code of
Practice (Scotland) however the standards expected and required are no different to those demanded in private
sector premises. 
The Service will adhere to the HSE’s enforcement policy statement in relation to matters of occupational health &
safety. 
SECTION 3: SERVICE DELIVERY 
3.1 Food and Health & Safety Premises Interventions 
Food Safety 
Previously we had a target of achieving at least 96% of all our programmed food inspections.  In 2018/19, which was
the last complete year we had pre-pandemic we reached this target.  When the Food Law Recovery started in
2021/22, our target was revised to 60% as it was dependent on staff resource available to undertake the Food Law
Recovery Process (FLR).  We achieved 87% of planned interventions by the scheduled date.  The Interventions Food
Law Code of Practice (Scotland) requires that establishments receive an Intervention no more than 28 days after the
scheduled date, unless they are rated Band E, the lowest possible rating.  The scheduled dates for FLR visits are the
latest date by which that intervention should be undertaken and do not have a 28 day grace period.  Our
performance in terms of the Interventions Food Law Code of Practice (Scotland) is therefore greater than that
reported if taking account of the 28 day grace period for some interventions.  Year 1 was a lighter year in terms of
food law recovery and the associated scheduled dates for intervention which has allowed us to bring forward some
Interventions from Year 2, one of the two heaviest years forecast in terms of FLR.  The target for 2022/23 was set at
70% for programmed food inspections. We achieved 95.9% of planned interventions by the scheduled date.  The
target for 2023/24 has been set at 75% for programmed food inspections. 
Business Regulation stepped up to being an ‘early adopter’ of the new Annex 5 pilot scheme and participated in the
implementation group, having formerly worked in partnership with FSS to develop a viable alternative for rating of
food establishments referred to as the Food Law Rating System (FLRS).  The FLRS combines the rating systems for
Food Hygiene and Food Standards into one Food Law Intervention scheme based upon a new Food Business
performance model that will target resources on high to medium risk and non-compliant businesses.  This impacts
upon the frequency of inspection of food establishments for both hygiene and standards components of what is now
known as a ‘food law’ inspection.  The scheme went live to all local authorities on 1 July 2019 and has been formally
adopted by us. 
Page 239 of 366

Page 240

food safety/occupational health & safety service plan 2023/2024  14 
The FLRS takes account of a food business operator’s track record of compliance and where this is good, they will
receive ‘earned recognition’ influencing the risk rating to reduce intervention frequency.  This will assist resources to
be targeted towards businesses which consistently fail to achieve satisfactory standards, and which will be subjected
to sustained and intense enforcement activity. 
This links into our policy for working more efficiently, effectively ensuring that resources are always targeted where
they are most needed. 
In addition, new premises will receive an initial inspection to check that everything is in order and will be risk rated in
accordance with the Interventions Food Law Code of Practice (Scotland) 2019.  The only food businesses which
would not be subjected to proactive inspections are low risk Group 3 Band A premises which following initial or
subsequent intervention or where the food registration form gives sufficient information to make determination that
there is minimal inherent risk, and the Lead Food Officer determines either to place the business on a 60 month
intervention frequency or choose not to undertake a proactive intervention.  Questionnaires would be used to assess
ongoing compliance with Group 3 Band A premises, with inspections being carried out only where deemed
necessary. 
Impact of Covid-19
On 17 March 2020, following publicity of Covid-19 cases within a care home located within North Lanarkshire, NLC
food officers stood down inspections initially of premises with a community risk including care homes, hospices,
hospitals, schools, pensioners clubs and prisons, due to Covid-19, then of all other inspections/visits until a policy
was formulated with forthcoming advice from FSS.  This means that our intervention programme from 2019/2020
was not completed and there was a carry over.  Face to face interventions were again stood down late December
2021 to end of January 2022 due to the wave of Omicron variant, except where required to protect public health or
safety and where remote working would not be sufficient.   
Food Law Code of Practice deviations: 
Given the unprecedented nature of the Covid-19 pandemic and national infection control measures introduced in
March 2020, and the anticipated disruption caused by staff shortages, it was recognised that deviation from certain
elements of the Food Law Code of Practice (Scotland) 2019 (the Code), and associated Interventions Food Law Code
of Practice 2019, would be necessary to ensure Local Authority Environmental Health Services had the ability to
undertake wider public health duties related to Covid-19.  LAs received written confirmation (FSS/ENF/20/006) from
FSS that the Minister for Public Health and Sport agreed to allow LAs to deviate from the Code and the agreement
covered the following areas which are considered to be reasonable and proportionate in the circumstances. 
Food Law Code of Practice deviations included:
a) Food Law interventions to all care facilities including hospitals, care homes, nurseries, and childminders. 
b) Planned programmed Interventions at all lower risk Group 2 and 3 businesses within the Food Law Rating
System (FLRS), and all Crown Establishments. 
c) Low risk primary production activities - exception for dairy farms supplying raw milk for the manufacture of
raw milk cheese. This includes on farm inspection to assess compliance against primary production controls. 
d) Approved establishments and other high risk manufacturers may limit access to high risk production areas.
Therefore, it is recommended that Interventions at Approved establishments, and higher risk FLRS Group 1
businesses, are based on an initial Food Safety Management System and associated documentation audit
followed up by physical inspection only if public health concerns are identified.
e) Intelligence driven Interventions at all food business establishments regardless of category should continue
where possible. Intelligence will include information that suggests fraudulent activity or imminent risk to
public health, e.g., consumer complaints, credible allegations of food poisoning, failed samples of a serious
nature that suggest fraud or health risk. 
The Food Law Code of Practice deviations were then revised and extended to 31 August 2021: 
Page 240 of 366

Page 241

food safety/occupational health & safety service plan 2023/2024  15 
a) Food Law interventions to all care facilities including hospitals, care homes, nurseries, and childminders. 
Restricting interventions in this sector will assist with maintaining physical distance requirements and
acknowledges the associated risks to these vulnerable groups.
b) Planned programmed Interventions in all risk levels above a C band across all business groups within the
FLRS and all Crown Establishments. 
c) Low risk primary production activities - exception for dairy farms supplying raw milk for the manufacture of
raw milk cheese.  This includes on farm inspection to assess compliance against primary production controls. 
It was confirmed with FSS that for interventions of C, D & E premises which were no longer included in deviations
from the Code that we could continue with established practice during Pandemic, i.e., initial remote assessment
(Official Control Verification letter or business questionnaire) with follow up visit being carried out only where
deemed necessary to protect public health.  Ongoing demands on Service meant that we adopted this approach for
Band D & Es but did not have the capacity to also adopt for Band Cs due the increased time resource required for
remote assessments and other demands on the Service. 
Food Law Code of Practice deviations recovery plans
FSS and SFELC agreed broad principles on which Local Authority Covid-19 Recovery Plans would be based.  A project
to deliver the framework for each Scottish Local Authority to reconfigure or reset its intervention programme was
undertaken by the SFELC Covid-19 Recovery Working Group.  The desired outcome of this project was to assist LAs
devise their work programme and help the authority recover from the pandemic.  This includes adaption of
Intervention Plans to accommodate not only those establishments/interventions which were ‘missed’ during the
Covid-19 lockdown phase but also those which had previously fallen out of scope as a consequence of being missed. 
The estimation of staffing resources required is also based on the SFELC Covid-19 Recovery Working Group guidance
for calculating staffing resources. 
The project was designed to facilitate the following by defined completion dates: 
• Local Authorities will present a revised Intervention Programme which will operate from a defined date; 
• The Intervention Programme shall include all food establishments, each being accorded a revised due
intervention date; 
• Every food establishment on the Intervention Programme shall be risk-rated in accordance with the
Interventions Code 2019 Food Law Rating Scheme, except for approved premises and primary producers
which remain under Annex 5 Risk Rating Systems; 
• Every Local Authority shall present a Service Plan, incorporating the revised Intervention Programme in
addition to all other responsibilities, in accordance with the current service planning guidance (Note the
forthcoming Administration and Service Planning, Food Law Code of Practice (Scotland) 2020, which had
been expected to be published by December 2022 is currently on hold pending a wider project to review and
update the FLCoP as well as the mechanism for updating the Code to support the launch of the Scottish
Authority Food Enforcement Rebuild (SAFER) programme.)
• Local Authorities shall calculate the total FTE resource required to satisfy the Intervention Programme and
the remainder of the Service Plan by means of an agreed calculation methodology. 
It was acknowledged that the project outcomes would highlight some shortfall in available resources at some Local
Authorities.  While clear sight of these shortfalls is an essential deliverable of the project, the project scope does not
extend to addressing these deficits in any practical sense. 
Methodology 
SFELC convened a short-life working group which delivered the key requirements.  All Scottish Local Authorities were
invited to participate and NLC was represented.  A FSS Project Team was assembled to support the SFELC Working
Group and provide oversight of progress. The SFELC Working Group had 4 work streams: 
1. Desktop Transfer: The initial formula to convert premises on Annex 5 to FLRS.
2. Creation of an intervention programme: Ensuring all FLRS premises are within the revised Inspection
Programme with due intervention dates included.
3. Resource Calculation: Based on the SFELC resource methodology on FSS/SFELC website and refining this to
accommodate current circumstances.
Page 241 of 366

Page 242

food safety/occupational health & safety service plan 2023/2024  16 
4. Service Planning Guidance: Revising the Service Planning Guidance and using the draft Administration and
Service Planning Food Law Code of Practice.
The outcome of the SFELC Working Group was published in December 2020 ‘Local Authority Recovery Project
Recovery Process Guidance’. 
There are Tables with Appendices 3, 4 and 5 which explain the calculation of resource requirements for food law
recovery and programmed interventions. The calculations remain as detailed in the appendices as we are awaiting
information from FSS on the outcome of a Time Management Exercise (TME) involving all Local Authorities. 
Appendix 3- These resource calculations are for a 12 month period, with Year 1 commencing on 1 October 2021. 
• Appendix 3 Table 1 - Annual Breakdown of Food Law Recovery Plan Interventions Required to Be Carried
Out - details the total number of planned food law recovery interventions to be undertaken within the
maximum time frame after the Intervention Start Date, including Approved Premises and Group 1
Manufacturers.  Note there are further details of how these should be spread within that time frame
depending on Priorities within FSS and SFELC Recovery Process Guidance. 
• Appendix 3 Table 2 - Food Law Interventions Recovery - Officer FTE Resource Calculation Per Intervention
Category (Recovery Visits Only) - details the Officer FTE resource estimated to deliver the food law recovery
interventions only.  NB - this does not include other interventions in addition to food law recovery
inspections during this period. 
• Appendix 3 Table 3 - Estimate of Timescales and Numbers for Food Law Recovery Intervention and First
Next Programmed Intervention After Food Law Recovery Intervention - this is a breakdown of the number
of food law recovery interventions and first recurring risk assessed intervention per group and band which
require to be scheduled across the five years of the recovery period. 
• Appendix 3 Table 4 - Calculation of Resources Required for First Next Programmed Intervention After Food
Law Recovery Intervention - this only takes into account the first recurring risk assessed programmed
intervention, following the Food Law Recovery Intervention and Officer FTE resource estimated to deliver it.
It does not account for further recurring risk assessed programmed interventions e.g., those at 12, 18 or 24
intervention intervals which might fall again within the 5 year recovery period.  Nor does the figure include
projected Band E intensive 1 month interventions and Band D intensive 3 month interventions, revisits and
new premises inspections. 
• Appendix 3 Table 5 - Combined Estimate FTE Resource Calculation Per Annum for Food Law Recovery and
PI Interventions - details likely timescale for when next programmed inspection will be due after food law
recovery inspection and the Officer FTE resource estimated to deliver the food law recovery interventions
and next programmed interventions after food law recovery intervention.  It does not include projected
Band E intensive 1 month interventions and Band D intensive 3 month interventions, the anticipated uplift in
enforcement action, revisits and visits to new premises registering from 1 October. 
• Appendix 3 Table 6 - Summary of FTE Base Resource Needed to Meet FLRP+ First Recurring PI Thereafter -
this is a summary of FTE resource needed to meet the Food Law Recovery Plan and the first recurring PI
thereafter only.  It does not include projected Band E intensive 1 month interventions and Band D intensive 3
month interventions, the anticipated uplift in enforcement action, revisits and visits to new premises
registering from 1 October.  
• Appendix 3 Table 7 - Estimate of Minimum FTE Resource Requirement for Revisit Interventions - this is a
summary of FTE resource needed to meet the revisit requirement of Food Law Recovery Plan and the first
recurring PI thereafter only.  This resource calculation is based on a 1 hour revisit for every intervention
averaged out across the 5 years.  Whilst some premises will not require a revisit, others will require longer
revisits or multiple revisits.  It was intended to bring forward year 2 visits into year 1 if there was capacity. 
This Table does not include revisits to projected Band E and D intensive 1 month and 3 month interventions. 
Page 242 of 366

Page 243

food safety/occupational health & safety service plan 2023/2024  17 
The purpose of revisits is to monitor non-compliant standards arising from the initial inspection and/or
matters of evident concern. 
• Appendix 3 Table 8 - Additional Food Law Interventions Arising from Poor Compliance and From New
Businesses Year 1 Estimate Only - poor compliance interventions relate to a minimum frequency of re-
intervention of 1 month, followed by 3 months, after service of formal notices or serious non-compliance.
This is a summary of FTE resource needed to meet Year 1 projected 78 Band E intensive 1 month
interventions (based on total numbers of Remedial Action Notices and Voluntary Closure Agreements during
2018-19 and an anticipated 200% uplift in enforcement action due to the pause in interventions) which at
best will result in a further 78 subsequent Band D 3 month interventions.  This is during a 12 month period
until 30 September 2022.  These are estimated as Group 2 Band D & E resource requirement.
The number of anticipated new businesses interventions is based on previous annual figures and are
estimated as Group 2, Band C, average resource requirement. 
• Appendix 3 Table 9 - Estimated Resource Required for Formal Food Enforcement Notices - this is a
summary of FTE resource needed for formal food enforcement notices served in a typical year pre-Covid
(2018-19). 
• Appendix 3 Table 10 - Service Requests Resource Summary-Based on A Typical Year Pre-Covid (2018-19)-
details Officer FTE resource estimated to deliver service requests for the range of functions undertaken by
Business Regulation in a typical year pre-Covid (2018-19) 
• Appendix 3 Table 11 - Miscellaneous Foreseeable Additional Demands on Service Resource - details Officer
FTE resource estimated to deliver additional demands on Service not included elsewhere.  Please note that in
respect of FHIS Uploads included in this table, although there is some input required from officers, there is
significant Support resource provided to undertake the main body of this work which reduces the burden
that would otherwise be placed on officers.  Excluded from this table is, for example, work related to 
COVID-19 pandemic, food poisoning outbreaks and reports to the Crown as these are impossible to quantify. 
•  Appendix 3 Table 12 - Estimate of Resources Required to Deliver Business Regulation Service Across The
Food Law Recovery Period (Oct 2021-Sep 2026) - details Officer FTE resource estimated to deliver demands
on Service.  This is a conservative figure.  Formal Food Enforcement Notices are based on numbers served in
2018-19 of which there are anticipated to be more during the food law recovery period.  Food Law
Interventions arising from poor compliance have been included only for Year 1.  Excluded also is, for
example, work related to COVID-19 pandemic, food poisoning outbreaks and reports to the Crown as these
are impossible to quantify. 
Appendix 4 – Updated Tables of Calculations and Information Relating to Staff Resources for Service Plan 2023-
2024 including Year 3 of Food Law Recovery Plan commencing 1 October 2023. 
• Appendix 4 Table 1 - Annual Breakdown of Food Law Recovery Plan Interventions Required to Be Carried
Out- details the total number of planned food law recovery interventions to be undertaken within the
maximum time frame after the Intervention Start Date, including Approved Premises and Group 1
Manufacturers.  Note there are further details of how these should be spread within that time frame
depending on Priorities within FSS and SFELC Recovery Process Guidance. 
• Appendix 4 Table 2 - Food Law Interventions Recovery - Officer FTE Resource Calculation Per Intervention
Category (Recovery Visits and New Premises Only) - details the Officer FTE resource estimated to deliver the
food law recovery interventions only.  Note this does not include other interventions in addition to food law
recovery inspections during this period. 
• Appendix 4 Table 3 - Estimate of Minimum FTE Resource Requirement for Revisit Interventions - this is a
summary of FTE resource needed to meet the revisit requirement of Food Law Recovery Plan and the first
recurring PI thereafter only.  This resource calculation is based on a 1 hour revisit for every intervention
Page 243 of 366

Page 244

food safety/occupational health & safety service plan 2023/2024  18 
averaged out across the 5 years.  Whilst some premises will not require a revisit, others will require longer
revisits or multiple revisits.  This includes some year 2 visits being brought into year 1 where capacity exists. 
This Table does not include revisits to projected Band E and D intensive 1 month and 3 month interventions. 
The purpose of revisits is to monitor non-compliant standards arising from the initial inspection and/or
matters of evident concern. 
• Appendix 4 Table 4 - Estimate of Resources Required to Deliver Business Regulation Service Across the Food
Law Recovery Period (Oct 2021-Sep 2026) - details Officer FTE resource estimated to deliver demands on the
Service.  This is a conservative figure.  Formal Food Enforcement Notices are based on numbers served in 2018-
19 of which there are anticipated to be more during the food law recovery period.  Food Law Interventions
arising from poor compliance have been included only for Year 1.  Excluded also is, for example, work that was
related to COVID-19 pandemic, food poisoning outbreaks and reports to the Crown as these are impossible to
quantify. 
The estimated resource requirement is under ongoing review.  The calculations remain as detailed in the
appendices as we are awaiting information from FSS on the outcome of a Time Management Exercise (TME)
involving all Local Authorities. At June 2023, we are still within Year 2 of the Intervention Programme Start
Date.   
• Appendix 5 - Premises Outwith Food Law Rating - Calculation of Required Annual Resource (June 2023) -
Approved Premises, High-Risk Group 1 Manufacturers and Primary Producers.
This details Officer FTE to deliver interventions of Approved Premises and High Risk Group 1 Manufacturers
based on Official Control Verification (OCV) principles and other business still operating under Annex 5 (Food
Hygiene and Food Standards), except those approved by FSS and for which we deal with Food Standards only and
are included within Appendix 3 Table 11. High Risk Group 1 manufacturers continue to fall within the food law
rating scheme. Due to other demands on the Service, the roll out of OCV for these premises has not been fully
implemented. Food law interventions undertaken for the high risk Group 1 manufacturers during 2023/24 will
not utilise the OCV audit process, except where deemed appropriate. It is anticipated that these premises will
receive interventions based on OCV principles and methods of the OCV when resources permit. 
At June 2023, Year 2 of Food Law Recovery is still ongoing.  Food Law interventions are combined interventions
covering both food hygiene and food standards interventions.  The resource calculation has been reviewed but
does not present a full year of interventions since the start of the food law recovery and remains a conservative
figure. Due to Year 2 being a heavier year in terms of food law recovery inspections than Year 1, we brought
forward interventions due within 18 months to Year 1, where capacity existed.  The estimated inspection activity
for Year 3 (commencing 1 October 2023) is summarised below. 
Estimated Inspection Activity Sub-Totals Total
Number of Food Law Interventions due to end of
Year 3 FLR 30/9/24 
(This does not take into account revisits,
new premises visits or formal actions) 
1071
Additional Food Law Interventions Arising from Poor
Compliance and From New Businesses (Appendix 3
Table 8)- projected Band E intensive 1month
interventions based on total numbers of Remedial
Action Notices and Voluntary Closure Agreements
during 2021 - 2022 which at best will result in
subsequent Band D 3 month interventions 
32 Band E & 32 Band D  64
secondary food law inspections (or revisits). The
purpose of revisits is to monitor non-compliant
standards arising from the initial inspection and/or
matters of evident concern. Resource calculations
for revisits for Year 1 (12 months) average over 5
1,338  1388
Page 244 of 366

Page 245

food safety/occupational health & safety service plan 2023/2024  19 
years is recorded in Appendix 3 Table 7 to estimate
for Year 2 
New Premises Inspections -Premises currently
registered and awaiting inspection
80 80
Total  2603 
Our average annual number of revisits to check on non-compliance over 2016 to 2019 was 1,218 (991 food hygiene
and 227 food standards).  The revisits we undertook in 2019/2020 were 461 food law, 172 food hygiene and 27 food
standards.  For Year 1 Food Law Recovery (October 21-September 22), we undertook 549 revisits to food premises
(food law, food hygiene and food standards). For the first 6 months of Year 2 Food Law Recovery to date (October 22
to March 23), we have undertaken 277 revisits to food premises (food law, food hygiene and food standards). This
figure excludes revisits to investigate complaints. 
Our average annual number of new premises visits over 2016 to 2019 for food hygiene was 208 and for food
standards is 207.  The new premises inspections we undertook in 2019/2020 were 190 food law, 63 food hygiene and
62 food standards.  It was expected that due to the anticipated increase in enforcement action, the number of
revisits required in Year 1 would be at a higher rate in comparison to Interventions undertaken than in previous
years, with the resource required to deliver this being calculated over a 5 Year average in Appendix 3 Table 7.  Not
included here are any unpredictable or ad hoc interventions, for example, responding to consumer concerns over
poor cleanliness or structural conditions, hygiene malpractices or unsatisfactory foods prepared or sold locally.
The number of new premises registered during 2022/2023 was 184, of which 136 were inspection during that period.
The number of new premises inspections registered during the first 6 months of Year 2 FLR (October 21-September
22) was 100, of which 67 were inspected during that period.  As many register in advance of the 28 days statutory
period, new premises inspections cannot be undertaken as the business isn’t yet trading. 
The new FLRS places more emphasis on previously under enforced food standards matters and is therefore more
resource intensive.   
In addition, the Service has continued with the rollout of the OCV audit process for approved premises.  Training
rolled out by FSS on this to ensure that officers can robustly challenge documentation provided by food business
operators was delivered in 2022.  The OCV checklist had been used to undertake desk top assessments of Group1
businesses, including manufacturers in line with Food Law Code of Practice deviations permitted by The Minister for
Public Health and Sport. 
The OCV approach has been developed to ensure that the verification of a food control management system (FCMS)
during an official control inspection is systematic, structured and scientific.  It also ensures that the FCMS is verified
both in terms of its validation and implementation. Implementation of this new process will significantly increase the
time spent on official control visits at approved establishments. 
Food law interventions undertaken for the high risk Group 1 manufacturers during 2023/24 will not utilise the OCV
audit process, except where deemed appropriate. 
With regard to the inspection of food premises outwith normal working hours, our policy is to ensure that, where
premises are only open out with normal hours, appropriate provision is made for them to be inspected in accordance
with at least the minimum number of visits determined by their risk rating. 
Health & Safety 
There is a Statement of commitment between Local Authority and HSE Regulatory Services which sets out our shared
vision for an ongoing LA/HSE co-regulatory partnership available via https://www.hse.gov.uk/lau/statement.htm 
and which is appended to this Service Plan. 
Page 245 of 366

Page 246

food safety/occupational health & safety service plan 2023/2024  20 
In our interventions, we will respect the key provisions of the National Local Authority Enforcement Code.  Priority
action is resource dependent and will focus on matters pertinent locally. 
Fuller details of the occupational health & safety targets and objectives are prescribed in the report’s Appendix 1 and
are subject to adequate resources. 
Other projects may be added where they present nationally via the HSE, regionally from the West of Scotland Health
& Safety Liaison Group meetings or within North Lanarkshire through local intelligence. 
During 2021/2022 we undertook health and safety inspections of hotels and other accommodation is use for COP26
to check for legislative compliance and reduce likelihood of incidents arising to help ensure the success of COP26 and
protect reputation of all agencies involved. 
During 2022/2023 We undertook 2 projects for proactive inspections based on national intelligence:  
(i) High Volume Warehousing/Distribution in respect of poorly managed workplace transport. 
(ii) Industrial retail/wholesale premises in respect of poorly managed workplace transport/work at height/cutting
machinery/lifting equipment. 
We also undertook one project for pro-active inspection based on local intelligence involving hospitality
establishments-electrical safety, legionella and storage of equipment when not in use. 
We issued mailshots to 4 private swimming pools regarding global shortage of chlorine products and 38 to hotels
regarding a number of national and local topics, including safe storage and retrieval of equipment when not in use,
electrical safety in hospitality settings, duty to manage asbestos, falls from height & work on/adjacent to fragile
roofs/materials, gas safety in commercial catering premises, preventing exposure to carbon monoxide from use of
solid fuel appliances in commercial kitchens, legionella risks and spa pools and hot tubs 
It is estimated that 3 FTE of warranted officers time is spent on Health and Safety (based upon previous years’
intervention findings). 
3.2 Food and Food Premises Complaints 
The Authority’s policy regarding the investigation of food complaints is detailed in the Service Delivery Procedure
QAP 5.3 (Business Regulation) within the ISO 9001: 2000 Quality Management Document and within the Service’s
Food and Food Premises Complaints Policy and Food Complaints Standard Operating Procedure (SOP).The Service
intends to seek to maintain the performance target for investigating food complaints by commencing the
investigation of a minimum of 90% food complaints within two working day’s notification. 
In addition, we will observe the advice contained within LACORS guidance on food complaints and liaise with
home/primary and/or originating authorities. 
During the COVID-19 pandemic, many food businesses changed their operation, now having a greater presence on
social media/digital platforms and therefore wider distribution.  In addition, it is anticipated that there is an
increased number of establishments under new ownership or management. As such it is more difficult to predict the
number of food and food premises complaints anticipated during 2023/2024. 
Our average annual number of consumer complaints is 307 based on the last three years prior to 1 April 2020.  These
complaints may relate to the nature, substance or quality of foods, the condition of the businesses from where the
foods were made or sold or the malpractice of food business operators.  It was estimated that during 2022/23, we
would deal with 300 consumer complaints, including ‘Other Food’ jobs logged.  During 2022/23, we dealt with 248
Food and Food Premises Complaints, and 77 ‘Other Food’ service requests, totalling 325.   They vary in complexity
and the time required to complete our enquiries and can require corroboration increasing resource demand. During
2023/24 we anticipate we will deal with numbers similar with those experienced in 2022/23.
Page 246 of 366

Page 247

food safety/occupational health & safety service plan 2023/2024  21 
Food and Food Premises Complaints are only a fraction of the overall Service Requests dealt with by the Service. 
During 2020/2021 there were 2,600 service requests were dealt with by Business Regulation, which was 33% more
than the annual average from 2017/2018 to 2019/2020. During 2022/2023 there were 1997 service requests dealt
with by Business Regulation, which is similar to annual numbers received in a typical year pre-Covid (2018/2019 –
1954 Service Requests in Appendix 3 Table 7 Service Requests). 
The estimate of anticipated resource required to process Food and Food Premises Complaints, including ‘Other Food’
service requests in a typical year is recorded in Appendix 3 Table 7 Service Requests. 
3.3 Home Authority Principle/ Primary Authority Partnerships 
This Authority supported the LACORS principle of the home authority which has undergone review.  We do not act as
Home Authority for any businesses within the food sector.  Home Authority agreements exist with other UK local
authorities and for which we continue to liaise with those authorities where appropriate.  There are currently no
Primary Authority Partnerships in place in North Lanarkshire.  Where businesses have Primary Authority Partnerships
(PAPs) with other local Authorities, inspection plans and guidance published by the PAP will be considered and as a
matter of course there will be liaison with the PAP if formal enforcement action is considered. 
Notwithstanding this, advice and guidance is given freely, where requested, to food traders and numerous enquiries
are dealt with from other Authorities throughout the UK in accordance with the following broad principles. 
• Special emphasis is placed on the monitoring of goods and services originating from this area.
• Guidance and advice are given to businesses on food safety matters.
• Enforcement action makes provision for liaison with Other Authorities, where appropriate. 
3.4   Advice to Businesses 
Free advice is normally given to food safety and occupational health & safety businesses following routine
interventions and/or in response to separate enquiries. 
There is also a partnership agreement with Business Gateway to offer free advice to start up and ‘fledgling’
businesses who choose to locate within North Lanarkshire.  This was stood down due to pandemic as it is reliant on
information being furnished by Business Gateway, but we anticipate that this will resume as part of business
recovery. 
We regard the advice given by our Officers as being an important part of our role as a regulator in helping businesses
to understand what is required and what good practice looks like. 
We are keen to ensure that all this work is undertaken to the highest possible standard and, wherever possible,
improve the level of customer service.  As part of this process, customer satisfaction questionnaires were sent to all
businesses following a routine intervention to ascertain the level of customer service and to afford the recipients of
our service, an opportunity to make their views on the level of customer service we provide, known to us.  By doing
so, we also commit to improve our standards where we can.  This was stood down during the Pandemic and will be
reviewed to digitise the process before resuming. 
During each phase of the COVID-19 pandemic, we provided advice, information and support to help secure the
confidence of those operating in the food and drink sector.  The demand on the service was significant and during
2020-21 included over recorded 2,600 service requests for Covid work for Business Regulation.  This includes service
requests from business, complaints against business, proactive visits and outbreak investigations.  It does not include
the proactive visits carried out during projects where recording was undertaken by exception only. In addition to this,
the Service sent in excess of 3,500 email communications to businesses, primarily within the food and drink sector to
assist with food safety, health and safety and Covid mitigations, for businesses which were able to continue
operating to operate as well as those restating after a period of closure.
Page 247 of 366

Page 248

food safety/occupational health & safety service plan 2023/2024  22 
Business Regulation used mailshot email communications with business for relevant matters arising e.g., during
2021/2022 for introduction of new legislation relating to food prepacked for direct sale (Natasha’s Law) and during
2022/2023 to raise awareness of Listeria monocytogenes cold cuts of meat and smoked fish amongst butcher's
premises and care homes respectively.  
Our average number of business advice requests was 195 based on the last 3 years prior to Covid.  We have seen a
reduction in the number of business advice requests received over the last couple of years. During 2021/2022 we
received 120 and during 2022/2023 we received 112.  It is anticipated this demand will be ongoing.  These vary in
complexity and time required to complete. As such it is difficult to accurately assess resource implications. 
Customer service satisfaction questionnaires were previously dispatched to all other service users where a request
has been logged on our computer system.  This included food product and food business premises complaints,
infectious disease investigations, health & safety issues and complaints and enquiries from members of the public. 
This was stood down during the Pandemic and will be reviewed to digitise the process before resuming. 
3.5 Food Inspection and Sampling 
The policy of this Authority is to have an effective routine sampling programme where the principal aim is to assist in
protecting the public and to meet relevant statutory obligations. 
The main thrust of the sampling programme is to focus on high risk food premises and on local manufacturers. The
Council also participates in sampling initiatives agreed by the West of Scotland Food Liaison Group. 
The analysis or examination of food and water samples is conducted by Glasgow Scientific Services who are also
consulted with regard to the nature and range of samples proposed to be taken each year in accordance with the
requirements of the Food Law Code of Practice (Scotland). 
Whilst our annual Sampling Programme for 2023/2024 has still to be created, it will continue to be a risk based
approach and will be undertaken in accordance with our Sampling Policy.  It will focus on high risk premises within
North Lanarkshire and is based on local priorities, as well as national priorities recommended by FSS, SFELC and
projects agreed within West of Scotland Food Liaison Group. 
Note: The number of samples taken will be determined by availability and priorities for the year. 
3.6 Control and Investigation of Communicable Disease including Outbreaks and Food Related Infectious Disease 
This Authority has developed and agreed an Outbreak Control Plan with NHS Lanarkshire which confirms agreed
procedures for the investigation and control of food poisoning.  North Lanarkshire Council works in partnership with
NHS Lanarkshire and South Lanarkshire Council and has produced a Joint Health Protection Plan for the Lanarkshire
area.  This is an important document which acts as a reference point for assisting in the investigation and control of
public health outbreaks and incidents.  Desktop exercises to ‘test’ plans have been useful in the past and are likely to
be repeated. 
Our average annual number of confirmed cases of food poisoning notified is 106 based on three years prior to 1 April
2020.  In 2020/21, 40 cases of food poisoning were reported to this Authority by NHS Lanarkshire, which is a
significant drop in previous years.  In 2021/22, 47 cases of food poisoning were reported to this Authority by NHS
Lanarkshire which is 17.5% increase from the previous year. In 2022/23, 87 cases of food poisoning were reported to  
this Authority by NHS Lanarkshire. This is an 85% increase on the previous year.  The number of notifications is
anticipated to continue to increase to pre-Pandemic average levels due to the return of international travel. The
Service seeks to maintain that a target of a minimum of 94% of infectious disease cases will be responded to within
the time frames stated within the NHSL Epidemiological Investigation Protocol.   During 2022/23, we responded to
100% of these within timeframe.  The estimate of anticipated resource required to process IDs based on a typical
year is recorded in Appendix 3 Table 7 Service Requests.
Page 248 of 366

Page 249

food safety/occupational health & safety service plan 2023/2024  23 
In response to the Omicron Wave of Covid-19 in December 2021, Protective Services established a Covid Team which
consisted of an Assistant Business Manager (Acting Up Temporary), a Senior Officer (Acting Up Temporary) and, from
Business Regulation, 2 seconded Environmental Health Officers.  One of the 2 EHOs remained within the team for 1
month and the other for 3 months, which impacted on the non- Covid work undertaken by that staffing resource. 
It is estimated that over 45% of Business Regulation staff time was dedicated to pandemic response during 2021/22
and over 80% in 2020/21.  The time spent on non- Covid work was also impacted due to precautions to be taken and
alternative ways of working to be found, resulting in work taking longer than would otherwise have been the case. It
is unknown what further ask may be made of the Service due to other Pandemics in future.   
3.7 Food Safety Incidents 
These are dealt with in accordance with the procedures detailed in the Food Law Code of Practice (Scotland).  An out
of office hours stand by service is maintained to respond to emergencies including Food Alerts for Action (FAFA)
issued through Food Standards Scotland’s warning system. 
No FAFA were received from FSS in 2018/2019 to 2022/2023. We undertook 19 spot checks following Food Alerts for
Information to check retailers had taken appropriate action.  It is estimated that that we will receive no more than 5
Food Alerts For Action from FSS during 2023/24. One FAFA was received during the 1st quarter of 2023/2024 which
involved considerably staff resource. 
During 2021/2022 we dealt with 10 Food Safety Incidents and Investigations in partnership with FSS.  These are an
intense use of officer resource requiring input from multiple officers and management working in partnership with
Food Standards Scotland Food Crime and Incidents Unit, with implications across Scotland and UK.   This number is
far greater than previously experienced and forecast but is difficult to predict.  During 2022/2023, we dealt with 7
Food Safety Incidents and Investigations. One related to food retailed within NLC but manufactured within another
LA. It is estimated that that we will deal with no more than 10 Food Safety Incidents and Investigations in partnership
with FSS. 
The estimate of anticipated resource required to process Food Safety Incidents in a typical year is recorded in
Appendix 3 Table 8 - Miscellaneous Foreseeable Additional Demands on Service Resource. 
Food Safety Incidents may be linked with Food Crime and Fraudulent Activities, Paragraph 3.10. 
3.8 Liaison with Other Organisations 
To ensure a consistent approach to enforcement action with neighbouring local authorities, North Lanarkshire is
represented in the West of Scotland Food Liaison Group (WSFLG) and the West of Scotland Health & Safety Liaison
Group (WSHSLG).  North Lanarkshire is also a WSHSLG representative on the Health and Safety Co-ordinating Group
Scotland (HASCOG), a group which co-ordinates health and safety enforcement.  The Authority was also represented
on the Official Control Verification Working Group (OCV).   The OCV Working Group was a new group amalgamated
from The Approved Establishment and the OCV Implementation Working Groups.  NL was represented at SFELC
Seafood Working Group for a Scottish solution to Export Health Certification requirements for Scottish Seafood
Industry in preparation for our exit from EU in respect of fish exporters.   
Internally, the Service liaises with Planning and Building Standards to ensure responses to planning and building
warrant consultations are responded to within timeframe.  The control of ventilation within the workplace is one of
the key mitigations in control of Coronavirus.  It is therefore anticipated that ventilation requirements within new
builds will be of key consideration in both planning and building warrant consultations on which this Service will be
consulted.  This Service also liaises with Licensing to ensure the same for licensing consultations and provides Section
50 Certification for premises confirming they meet with the structural requirements of food legislation.  The Service
is also represented on NLC’s Safety Advisory Group (SAG) which co-ordinates and considers event applications to
NLC.  As previously stated, NLC works in partnership with NHS Lanarkshire and South Lanarkshire Council and has
Page 249 of 366

Page 250

food safety/occupational health & safety service plan 2023/2024  24 
produced a Joint Health Protection Plan for the Lanarkshire area.  This is an important document which acts as a
reference point for assisting in the investigation and control of public health outbreaks and incidents.  Although the
Pandemic greatly increased our level of interaction between NHS Lanarkshire Public Health, Liaison Meetings with
NHS Lanarkshire were always held on a regular basis and will continue to be so. 
The estimate of anticipated resource required to process services requests in respect of liaison with other
organisations and internally is recorded in Appendix 3 Table 7 - Service Requests - Based on a typical year pre-Covid
(2018-19).  Table 7 does not include provision of mutual aid. 
3.9 EU Exit 
Of greatest concern in respect of the impact of EU exit was the Scottish food export market and in particular fish and
shellfish.  North Lanarkshire has two major fish exporters within its boundary.  Prior to 1 January 2021 there was no
need for export health certificates (EHCs) for such produce to the EU, however this changed due to exit which in
short means that each individual consignment of fish/ shellfish requires an individual EHC.  Export Certification Hubs
such as those within North Lanarkshire reduced the impact of EHCs required and therefore associated charges.  This
was foreseen to place a very significant burden on those LAs in which they are situated and who were unable to
resource it from current staffing resources without a very significant and detrimental impact to other public health
roles and to the Local Authorities statutory functions.  In July 2020, Scottish Government determined that provision
of EHCs at the Hubs would be overseen by FSS and not LAs.   
North Lanarkshire Council formally offered mutual aid to FSS in respect of fish export hubs located within the district,
effective from 1 January 2021.  This was to ensure adequate resource was in place at the hubs to issue Export Health
Certificates and thereby prevent exports being adversely hampered by the pandemic.  Although this has not been
called upon, the mutual aid for other agency partners remains in place. 
The Hub model requires risk based certification of fishery products and live bivalve molluscs which required
originating authorities, including North Lanarkshire, to provide attestations of compliance of supplier premises to
Food Standards Scotland which oversees the hubs.  These are done in at least 6 monthly intervals and require
ongoing OCV audit of supplier premises. 
We have also provided support and guidance to other approved premises and manufacturing premises which export
to assist with the complex EU exit rules which now exist.  These can involve complex considerations following export
issues at Border Control Posts and can require liaison with both FSS and Department of Environment Food and Rural
Affairs (DEFRA). 
The Windsor Framework will alleviate the potential impact of the original NI Protocol in respect of exports of
Products of Animal Origin to Northern Ireland. 
3.10 Food and Health & Safety Promotion 
We aim to continue to give our full support in 2023/2024 to Food Standards Scotland’s Eat Safe Initiative.  The
scheme consists of an award granted by Councils to specific categories of food businesses within the scheme which
meet standards of hygiene in excess of that required by current food hygiene legislation. 
It is intended to promote the scheme, wherever possible, to encourage as many food businesses as possible to
attempt to obtain and retain the award thus helping to drive up food safety standards within North Lanarkshire. 
We will continue our partnership work with the Scottish Government and NHS Health Scotland to promote the
Healthy Living Award via our website.  The Healthy Living Award was paused due to Covid-19 Pandemic and restarted
in May 2022. 
We will also continue to work with the Scottish Centre for Healthy Working Lives to promote health & safety in small
and medium sized businesses within North Lanarkshire.
Page 250 of 366

Page 251

food safety/occupational health & safety service plan 2023/2024  25 
And we will work with the HSE to promote national priority topics and campaigns such as ‘Helping GB Work Well’.  
It is difficult to accurately assess resource implications for the initiatives and promotional work which we aim to
undertake during 2022/2023.  It is also difficult to identify measures that will be used to evaluate the effectiveness of
these. 
3.10 Food Crime and Fraudulent Activities 
Activity that is classed as Food Fraud and / or Food Crime can be described as serious dishonesty that impacts
detrimentally on either the safety or the authenticity of food.   Food Fraud is a dishonest act or omission, relating to
the sale or preparation of food, which is intended for personal gain or to cause loss to another party.  Food Crime
(serious Food Fraud) is considered to be serious or complex fraud or serious and dishonest regulatory 
non-compliance in relation to food, drink and animal feed. 
Upon suspicion of Food Fraud, action shall be taken as set out within the Service Food Incidents, Alerts, Food Fraud &
Food Crime Policy and Standard Operating Procedure, which are aligned with the Food Law Code of Practice
(Scotland) 2019.  There is an anticipated increase in food crime and fraudulent activities as a result of our exit from
the EU.  These are an intense use of officer resource requiring input from multiple officers and management working
in partnership with Food Standards Scotland Food Crime and Incidents Unit, and across other local authorities.  The
estimate of anticipated resource required to process Food Crime in a typical year is recorded in Appendix 3 Table 8 -
Miscellaneous Foreseeable Additional Demands on Service Resource. 
Food Crime and Fraudulent Activities may be linked with Food Safety Incidents, Paragraph 3.7. 
3.12 Other Demands on Service 
The average annual number of service Requests dealt with by Business Regulation from 2017/2018 to 2019/2020
was 1,951.  During 2020/2021, Business Regulation alone undertook over 5,000 service requests, which included
proactive and reactive Covid visits to businesses, including long and complicated COVID outbreak investigations
involving multiple officers.  This does not include the 953 Covid complaints and visits undertaken by Trading
Standards colleagues, which again excludes the proactive visits they carried out during projects where recording was
undertaken by exception only.  During 2021/2022, Business Regulation dealt with 2,600 service requests, which was
33% more than the annual average from 2017/2018 to 2019/2020. During 2022/2023 there were 1997 service
requests dealt with by Business Regulation, which is similar to annual numbers received in a typical year pre-Covid. 
In October 2022, FSS announced the launch of the Scottish Authority Food Enforcement Rebuild (SAFER) programme
to develop the future model for delivery of official controls. It is to be a collaborative approach involving FSS, Local
Authorities and Scottish Government.  It is recognised that, for a number of years, across Scotland there has been a
decline in FTE Food Officers but an increase in demands placed upon them due to changes in food premises and
increased demands due to the new Food Law Rating Scheme.  Local Authorities are being asked to free up resource
to assist with its development. 
The SAFER themes and workstreams include:
Resourcing- Qualifications and Competency
Digitalisation-Centralised Database & Dynamic Delivery
Food Law Delivery-Interventions & Charging 
North Lanarkshire Council Business Regulation staff have already attended SAFER events to contribute to the
programme and are already engaging with FSS. 
To assist with succession planning , North Lanarkshire Council continue to train student Environmental Health
Officers and have committed to offer a training position each year to a student studying Environmental Health at
University of the West of Scotland, during their 3rd year and following graduation,  to provide the practical training
Page 251 of 366

Page 252

food safety/occupational health & safety service plan 2023/2024  26 
required for them to be presented for examination for the professional qualification required for Environmental
Health Officers. 
SECTION 4: RESOURCES 
4.1 Financial Allocation 
The cost of operating the food safety service is estimated at £1,105,252. This is based on 80% of Business Regulation
staff resource being spent on Food Safety (and is inclusive of the annual SLA charge for GSS which is utilised across
other NLC services and is £279,286 this financial year).   
There is no specific financial provision for any legal action necessary as part of our enforcement function as this is
provided within the Council by its Legal & Democratic Solutions Service. 
4.2 Staffing Allocation 
The current Business Regulation Service staff establishment is as follows: 
• Protective Services Manager (Non-operational and shared with Pollution Control & Public Health and Trading
Standards)
• Assistant Business Manager (Business Regulation) who is also Lead Food Officer
• 3 Senior FTE Environmental Health Officers 
• 14.5 FTE Environmental Health Officers
• 1 FTE Food Safety Officer (FSO)
• 1 Vacant FSO Post (Recruitment process underway June 2023) 
The main changes to staffing allocation since 2022/2023 Service Plan is: 
• Loss of 0.5 FTE FSO post. 
• Change of an EHO post on the establishment to an FSO post, due to difficulty in recruiting an EHO for a post
vacated late 2022. 
The Service is jointly responsible for food safety and occupational health & safety issues.  Consequently, staff have a
dual role, but flexibility is applied whereby staff resources will be used wherever there is most need and this will be
kept under review. 
The Food Law Code of Practice (Scotland) 2019 details competency and authorisation levels of Authorised Officers of
Food Authorities who carry out interventions, in line with Regulation (EC) No 882/2004.  Authorisation Levels are
published on NLC’s  website.  EH and FSO competency and authorisation levels in June 2023: 
Designation Number of FTE Officers  Certifying Support Officer
Competency
EHO >2 Years Food Experience 13 N/A
EHO <2 Years Food Experience 1.5 N/A
FSO >2 Years Food Experience 1 N/A
Total 15.5 0 
The anticipated increase in our inspection activity due to the progressive implementation of the Food Law Rating
Scheme and intended roll out of OCV for approved premises and high risk Group 1 manufacturers placed doubt over
North Lanarkshire Council’s resource capability to deliver its estimated inspection activity in 2019/2020.  This
resulted in the creation of an additional 2 FTE permanent EHO posts in November 2019.  A review of Business
Regulation Management Resource undertaken in August 2020 led to the creation of a third SEHO post and the
Page 252 of 366

Page 253

food safety/occupational health & safety service plan 2023/2024  27 
deletion of a front line EHO post.  Following approval at the Workforce Steering Group on 23 July 2021 for an
additional 3 temporary EHOs/FSOs to assist with COVID recovery, recruitment campaigns for temporary staff were
unsuccessful.  This resulted in the deletion of these 3 temporary posts and the creation of 2 FTE Environmental
Health Officer posts as permanent additions to the establishment within Business Regulation early 2022. 
FSS Resource Methodology Guidance was utilised to identify any potential shortfall in staffing compliment.  
Programmed food law Interventions resumed on 1 September 2021 following the Desktop Transfer and revised
Intervention Programme. However, for performance monitoring and reporting purposes, the Intervention
Programme Start Date for North Lanarkshire was 1 October 2021 as this will keep all quarterly reports aligned with
normal Service planning and reporting. It is anticipated that the total resource required from the Intervention
Programme Start Date of 1 October 2021 is as follows, as detailed in Appendix 4 Table 4: 
Activity/ statutory Duty
Required FTE
resource
calculated-annual
Required FTE
resource
calculated - over 5
years
Food Law Recovery process visits   15.97
Food Interventions – first recurring
programmed intervention only   18.80
FL intervention revisits   4.05
FL Interventions re Poor
Compliance and New Businesses
Year 1 Only  
6.73
New Business Interventions Years 2
to 5 3.174 12.7
Service Requests 5.49 27.45
formal food enforcement notices   0.5
Health & Safety Enforcement 3 15
OCV/ group 1/Primary Producers 1.51 7.55
Subtotal – 5 year resource FTE  
108.75
(21.75 Average per
annum)      
Sickness/ Special Leave & Training 1.98 9.91
Miscellaneous Additional Demands
on Service Resource   5.24
Total   123.90 FTE over 5
years    
24.78 FTE per
annum (average)   
A ‘standard day’ figure for the calculation of resources required to meet food law obligations has been considered
and determined that the figure of 5 hours is the most suitable.  This figure accords with that in the OCV resource
calculation.
Page 253 of 366

Page 254

food safety/occupational health & safety service plan 2023/2024  28 
The number of working days per officer per year, taking account of annual leave and public holidays is 218, however
other leave such as sickness absence, special leave and training still need to be factored in.  This other leave has been
considered in the above table to determine resource needed. 
As an alternative to recruitment consideration will again be given to the use of agency staff for inspections, if
required, albeit any enforcement action will require to be handed back to NLC staff to implement.  Costings of
agency inspections will need to be undertaken before a final decision is taken on this. 
A review of North Lanarkshire Council resource to meet its statutory obligations in terms of the Interventions Food
Law Code of Practice (Scotland) 2019 and Food Law Code of Practice (Scotland) 2019 has been undertaken as part
of the Food Law Code of Practice Deviation Recovery Plan.  The estimated resource requirement shows a deficit in
our resource to meet statutory requirements, even if the current vacant posts were to be filled.  There is a
national shortage of Environmental Health Officers which impacts on the success of recruitment campaigns,
particularly for temporary posts.  The estimated resource requirement is under ongoing review.  At June 2023, we
are still within Year 2 of the Intervention Programme Start Date.   
4.3   Staff Development Plan 
The Service is committed to ensuring that staff receive sufficient training in order to properly conduct their statutory
duties.  The key aim of the performance review & development scheme (PRD) is to provide a means of identifying
training which meet their professional requirements and help reach the targets of the Operational and Service Plans
as well as the Single Outcome Agreement Framework.  Limited management capacity within Business Regulation
coupled with preparations for EU exit dates set and resource demands from the pandemic meant the Business
Regulation Service was unable to deliver PRDs within 2019/2020 to 2022/2023.  As yet there has not been the
resource to do so within 2023/2024.  It is however ensured that all Business Regulation staff undergo a minimum of
10 hours of Continuous Professional Development (CPD) in food related matters, in line with requirements of the
Food Law Code of Practice (Scotland) 2019.  This was achieved on an annual basis from 2019/2020 to 2022/2023.  In
addition, all Environmental Health Officers within Business Regulation undergo a minimum of approximately 3 hours
of health and safety CPD annually. 
Adequate time needs to be set aside to allow officers to acquire knowledge and competency with new and amended
legislation and guidance e.g., that relating to improving allergen information for food sold prepacked for direct sale
introduced October 2021 (Natasha’s Law).  In addition, there had been a need for officers to refamiliarize themselves
with other food guidance as a result of food interventions having been stood down. 
Food Standards Scotland rolled out Level 4 HACCP Courses and OCV courses and which were successfully delivered
online during the pandemic.  The HACCP course lasted for 5 days with exams on the 6th day.  The revised HACCP run
in 4th quarter of 2021/2022 and of 2022/2023 lasted for 4 days with exams on the 5th day.  In addition, 1 day study
leave is given to each officer attending to prepare for exams, in accordance with the Council’s Special Leave Policy. 
The OCV course also lasts for 4 days with exams on the 5th day.  The revised OCV course during 2021/2022 ran for 3
days, with 14 hours pre-course reading.   The time allocated to each course by the Council will be 6 days for Level 4
HACCP and 5 days for OCV.  During 2021/2022 we had 15 staff attend OCV training and none attending Level 4
HACCP.  During 2022/2023, 3 staff successfully completed Level 4 HACCP Training and Qualification. It is hoped that
places will be available for an OCV course this year for these staff to attend. 
During 2022/2023, 21 Business Regulation staff underwent Food Competent Certifying Officer (FCCO) training and
successfully completed the examination.  This is a requirement for BR Staff to act as FCCOs to provide and validate
export health certificates and attestations for the purpose of international food exports post EU exit. 
Resource required for training is included within Appendix 3 Table 12 - Summary Estimate of Resources Required to
Deliver Business Regulation Service Across the Food Law Recovery Period (Oct 2021-Sep 2026).
Page 254 of 366

Page 255

food safety/occupational health & safety service plan 2023/2024  29 
SECTION 5: QUALITY ASSESSMENT 
5.1 Quality Assessment and Internal Monitoring 
Key food safety and health & safety policies and procedures are included within an ISO 9001: 2008 compliant Quality
System and within the Services Food Policies and Standard Operating Procedures are periodically reviewed to reflect
on-going legislative and procedural changes. Reviews have recommenced following being stood down during the
Pandemic due to other demands placed on the Service. 
In response to the 2018 Audit by FSS, we reviewed our internal monitoring, which had previously formed part of the
ISO System, and implemented an Internal Monitoring Policy and Procedure to ensure that the nature and quality of
food law interventions undertaken by officers are, so far as is reasonably practical, carried out to a uniform high
standard and that interpretation and action taken by officers is consistent.  This Internal Monitoring Policy and
Procedure was stood down due to the pause in food law interventions and the additional pressures placed on the
Service in response to the pandemic.  This Internal Monitoring Policy and Procedure has now been reviewed and is
being implemented during 2023/24. 
SECTION 6: REVIEW 
6.1 Review against the Operational Plan 
The Service Plan will be reviewed quarterly by the Assistant Business Manager (Business Regulation) and details of
reviews will be documented in the minutes of the PSMT and any decisions taken to address deficiencies shall be
recorded therein.  Review and reporting delivery of the 2019/2020 Service Plan was not concluded due to pressures
placed upon the Service due to the pandemic.  The intervention programme was not concluded because inspections
were stood down on 17 March 2020.  Inspections missed because of that are incorporated into the Food Recovery
Plan contained within this Service Plan.   Annual performance reports of Key Performance Indicators shall be
published on North Lanarkshire Council’s website at: www.northlanarkshire.gov.uk.  Review and reporting delivery of
the 2021/2022 Service Plan was not concluded due to pressures placed upon the Service due to the pandemic. 
Review against the Operation Plan was resumed during 2022/2023. 
6.2 Identification of any Variation from the Operational Plan 
Variances from the Operational Plan will be highlighted at the time of the review and any reasons for the variance
will be noted along with any corrective action, if appropriate. 
6.3 Areas for Improvement 
Any areas identified as requiring action will be detailed as part of the audit and review process.  These will be
addressed by the Protective Services Manager and the Assistant Business Manager (Business Regulation) as part of
the review process and action taken shall range from immediate action to inclusion in the Operational Plan for future
years.  Business Regulation participated in the NL Digital Sprint during 2021/22 for Licensing activities before the
main Service Sprint currently underway in 2023/24.  The full Digital Sprint was due to have been undertaken in spring
2021 and then January 2022 but had to be pushed back due to other demands on the Service.  It is anticipated
participation in this may last approximately 7 months and commitment could be 2 to 3 workshops per week across
the different service areas, with each workshop usually lasting up to 3 hours per workshop.  It is anticipated that at
least one front line staff member would participate in each workshop.  The resource capacity for this is included
within Appendix 3 Table 11 - Miscellaneous Foreseeable Additional Demands on Service Resource. 
Review and upgrade of MIS will also require a resource capacity which is difficult to determine, and which will add to
the demands placed on the Service. 
Page 255 of 366

Page 256

food safety/occupational health & safety service plan 2023/2024  30 
In addition to the above there are Business Regulation Service Improvement Working Groups which are set up, as
required.  The estimate of anticipated resource required is included within Appendix 3 Table 11 - Miscellaneous
Foreseeable Additional Demands on Service Resource. 
SECTION 7:  PERFORMANCE PLANNING 
7.1 Performance Plan
The Performance Plan for 2023/2024 details the targets which have been set for key areas of work.  Monitoring against
these key areas will be undertaken on a quarterly basis as part of the review process and reasons will be recorded for
any non-conformance together with the appropriate corrective action.  Inspections resumed on 1 September 2021
following the Desktop Transfer and revised Intervention Programme.  However, for performance monitoring and
reporting purposes, the Intervention Programme Start Date for North Lanarkshire was 1 October 2021 (with the
agreement and approval of FSS) to keep all quarterly reports aligned with normal Service planning and reporting.  At
1 April 2023, we were 6 months into Year 2 of a 5 Year Food Law Recovery Plan. 
The details are listed in the Appendix 1 Business Regulation Performance Plan below. 
Page 256 of 366

Page 257

food safety/occupational health & safety service plan 2023/2024  31 
Appendix 1 - BUSINESS REGULATION PERFORMANCE PLAN 
Note: The Intervention Programme Start Date for North Lanarkshire’s food law recovery was 1 October 2021 to keep all quarterly reports aligned with normal Service Planning and 
Reporting.  The food law recovery plan is programmed for a 5 year period from 1 October 2021. Note the Scottish Authority Food Enforcement Rebuild (SAFER) being led by Food Standards
Scotland could impact on the performance targets below. 
Core Activities Target Start
& 
Stop Dates
Projected Achievements/
Outcomes
Lead
Team
Other
Teams
Monitoring Arrangements
BR1  Food Law Code of Practice Deviation
Recovery Plan 
1 April 2023
to 31 March
2024
Continue the Food Law Code of Practice Deviation
Recovery Plan in accordance with FSS and Scottish
Food Enforcement Liaison Committee broad
principles
BR
Service
None Quarterly review 
BR 2 Food Law Inspections of all risk rated
premises. 
1 April 2023
to 31 March
2024
Undertake 75% of inspections within deadlines set
from FLCoP Deviation Recovery Plan. 
BR
Service
None Monthly – Assistant BR
Manager / Quarterly review. 
BR 3  Sampling in Food Premises.  1 April 2023
to 31 March
2024
Review sampling programme and take samples
within scope of sampling agreement with GSS &
FLCoP Deviation Recovery Plan. Priority given to
samples from Approved or manufacturing premises
located within North Lanarkshire.
BR
Service 
None  Sample numbers monitored by
PS Manager.  Assistant BR
Manager to monitor follow-up
of reports of sample failures.
BR 4 National Food Sampling Programme. 1 April 2023
to 31 March
2024
Seek to conduct food sampling in partnership with
other agencies, in accordance with national
programmes & FLCoP Deviation Recovery Plan.
BR
Service
FSS,
WOSF
LG
Quarterly review of
programmes/ sample types by
Assistant BR Manager.
BR 5 Investigation of Food Complaints.  1 April 2023
to 31 March
2024
Commence investigation of 90% of complaints
within 2 working days of receipt. 
BR
Service
None BR Managers monitor progress
of investigation.
BR 6 Sampling from Public Water supply. 1 April 2023
to 31 March
2024
Limited to domestic complaint samples after referral
to SW has not resolved issue and sampling of
commercial premises (manufacturers and approved
premises), as appropriate.
BR
Service
None Quarterly review by Assistant
BR Manager. 
BR 7 Investigation of Infectious Disease
Reports.
1 April 2023
to 31 March
2024
Respond to 94% of notifications in accordance with
the NHSL Epidemiological Investigation Protocol.
BR
Service
None Assistant BR Manager
Page 257 of 366

Page 258

food safety/occupational health & safety service plan 2023/2024  32 
BR 8 Requests for assistance and advice. 1 April 2023
to 31 March
2024
Respond to 93% of high risk requests for
assistance/advice within 2 working days of receipt. 
BR
Service
None BR Managers to conduct
random checks. 
BR 9 Requests for assistance and advice. 1 April 2023
to 31 March
2024
Respond to 93% of low risk requests for
assistance/advice within 5 working days of receipt. 
BR
Service
None BR Managers to conduct
random checks. 
BR 10 Ongoing review of food safety
policies and procedures in line with
Food Law Code of Practice
(Scotland).
1 April 2023
to 31 March
2024
Review policies and update where required. BR
Service
None Monitoring undertaken by
Assistant BR Manager.
BR 11 Professional Training.  1 April 2023
to 31 March
2024
Ensure all BR Officers meet professional
development targets including that required by the
Food Law Code of Practice (Scotland) and FCCO
training, as required by APHA. 
BR
Service
Yes BR Managers ongoing review.
Monitoring for non BR Standby
Officers undertaken by
Protective Services Manager.
BR 12 Food Hygiene Information Scheme
(FHIS).
1 April 2023
to 31 March
2024
Maintain and supply data for FHIS BR
Service
None Assistant BR Manager
BR 13 Food Hygiene Information Scheme
(FHIS).
1 April 2023
to 31 March
2024
80% of food premises achieve the FHIS ‘Pass’ award.
It is anticipated there will be a greater number of
Improvement Required due to pause in programmed
interventions. 
BR
Service
None Assistant BR Manager 
Quarterly review. 
BR 14 Food Premises Registration Form 1 April 2023
to 31 March
2024
Continue to develop online registration of food
establishments as Digital NL Sprint progresses
BR
Service  IT
Assistant BR Manager
BR 15 Applications for approval under
Regulation EC No 853/2004
1 April 2023
to 31 March
2024
Ensure that all applications for approved premises
are processed within the legislative time frame 
BR
Service
None Quarterly review by Assistant
BR Manager. 
BR 16 Audit of Premises approved under
Regulation EC No 853/2004
1 April 2023
to 31 March
2024
Continue to progress implementation of the Official
Control Verification (OCV) audit process for
Approved Premises in line with FSS OCV
Implementation Guide.
BR
Service
None Quarterly review by Assistant
BR Manager. 
Page 258 of 366

Page 259

food safety/occupational health & safety service plan 2023/2024  33 
BR 17 Private Water Supplies 1 April 2023
to 31 March
2024
Update and maintain register of Private Water
Supplies and investigate opportunity for online
publication.  Continue to implement a monitoring
programme for each regulated supply and each
private water supply zone.  For regulated supplies,
continue to undertake risk assessments, where
applicable, in relation to water introduced into, and
supplied through and from, each private water
supply system to premises in its area, to establish if
there is any risk that the water could pose a
potential danger to human health. 
BR
Service
None Quarterly review by Assistant
BR Manager. 
BR 18 Process all applications for Private
Water Supply Grant Assistance
1 April 2023
to 31 March
2024
Ensure that all applications for grant assistance are
processed within the legislative timescale.
BR
Service
None Quarterly review by Assistant
BR Manager.
BR 19 Attestation and Export Health
Certification Requirements after EU
exit.
1 April 2023
to 31 March
2024
Continue to provide Attestations and Export Health
Certificates, as required. 
BR
Service  None
PS Manager/ Assistant BR
Manager.
BR 20 Health and Safety Enforcement. 1 April 2023
to 31 March
2024
Implement the provisions of the National Local
Authority Enforcement Code. Priority with regard to
implementation will be dependent on resources and
will focus on those provisions which are particularly
relevant to North Lanarkshire Council.
BR
Service
HSE Assistant BR Manager/
Quarterly Review. 
BR 21 Gas Safety and electrical safety in
catering establishments. 
1 April 2023
to 31 March
2024
Undertake surveillance in catering premises visited
during food inspections for matters of evident
concern relating to gas safety and electrical safety. 
BR
Service
None Assistant BR Manager/
Quarterly Review. 
BR 22 Hospitality Establishments-electrical
safety 
1 April 2023
to 31 March
2024
To improve standards of compliance, increase
awareness of legislative requirements to ensure
electrical equipment with potential to cause injury is
maintained in a safe condition.  Remind duty holders
to ensure both the fixed installation and electrical
appliances are inspected by competent persons at
appropriate intervals. Pubs, restaurants and cafés
are urged to ensure outdoor electrical equipment  
Assistant BR Manager/
Quarterly Review. 
Page 259 of 366

Page 260

food safety/occupational health & safety service plan 2023/2024  34 
such as lights and heaters are specifically designed
for outdoor use, installed by a competent person
and checked regularly for damage or water ingress.
Useful guidance Electrical safety at work 
BR 23 Health & Safety projects (subject to
adequate resources and which will
be dependent on FLCoP Deviation
Recovery Plan). 
1 April 2023
to 31 March
2024
(i) Proactive inspection of High Volume
Warehousing/Distribution in respect of poorly
managed workplace transport.
(ii) Proactive inspection of industrial retail/wholesale
premises in respect of poorly managed workplace
transport/work at height/cutting machinery/lifting
equipment.
(iii) Raise awareness with relevant premises (e.g.,
restaurants, takeaways, warehouses that receive
regular deliveries) the national priority in relation to
welfare provision for delivery drivers that HSE
guidance states that where it is practicable and
appropriate, any onsite toilet and rest facilities
should be made available to visiting workers if
requested.
(iv) incorporate into interventions of commercial
catering premises using solid fuel cooking
equipment, that appropriate measures are taken to
prevent carbon monoxide poisoning from lack of
suitable ventilation and/or unsafe appliances.
(v) Visitor attractions to prevent or control ill health
arising from animal contact-awareness raising,
education or proactive intervention.
(vi) Inflatable Amusement Devices-awareness raising
of safety measures;
(vii) Trampoline Parks/Inflatable Jump Parks-
highlight with local duty holders improved
information provision and supervision of users; 
(vii) Investigation of any patterns of accidents. 
BR
Service
HSE/
WSH&
SLG
Assistant BR Manager/
Quarterly Review.
Page 260 of 366

Page 261

food safety/occupational health & safety service plan 2023/2024  35 
(ix) Work Related Road Safety-awareness raising in
LA enforced premises e.g., warehouses, restaurants,
takeaways and other retail premises where workers
make deliveries that law requires business to
manage work related road risk in accordance with
recently reviewed joint HSE/DfT guidance Driving
and Riding Safely for Work 
(x)Falls from height-work on/adjacent to fragile
roofs/materials- where identified during visits
discuss associated risks, to ensure prospective
clients for repair and maintenance work (owner or
building user) are aware of their duties under CDM
2015 and the precautions needed, referring them to
the appropriate guidance Fragile roofs: Safe working
practices (hse.gov.uk). 
(xi) Raising awareness of the work related stress and
mental health campaign ‘Working Minds’ with
businesses. 
Officers to continue to deal with any MEC arising
whilst carrying out other interventions, including e.g.
•  ‘Slips, Trips & Falls’ 
• handling hot liquids in catering premises 
• safety of solid fuel ovens in catering
premises, and
•  work at height and fragile roofs. 
Additional projects will be added to those detailed
above if they become relevant having been
highlighted nationally by the HSE, regionally by the
WSHSLG or by local intelligence. 
Page 261 of 366

Page 262

food safety/occupational health & safety service plan 2023/2024  36 
BR 24 Licensing Applications 1 April 2023
to 31 March
2024
Ensure licensing responses to consultation are made
within 10 working days.
BR
Service
Licensi
ng
Assistant BR Manager
BR 25 Skin Piercing & Tattooing Licensing
Applications
1 April 2023
to 31 March
2024
Review licence conditions associated with Skin
Piercing & Tattooing Licensing Applications
BR
Service
None Assistant BR Manager
BR  26 Process all applications for skin
piercing and tattooing licences.
1 April 2023
to 31 March
2024
Ensure that all applications are processed within the
legislative timescale 
BR
Service
None Assistant BR Manager/
Quarterly Review 
BR  27 Skin Piercing & Tattooing Licenses 1 April 2023
to 31 March
2024
Develop Licences incorporating photograph of
operator for Skin Piercers and Tattooists
BR
Service
None Assistant BR Manager/
Quarterly Review 
BR 28 Investigation of reported accidents  1 April 2023
to 31 March
2024
Commence 88% of investigations required by HSE
incident selection criteria within 3 working days.
BR
Service
None Assistant BR Manager/
Quarterly Review 
BR 29 Maintain OHSAS 45001 Standard
Accreditation. 
1 April 2023
to 31 March
2024
Implement any action plan provisions following an
internal and/or external audit.
BR
Service
EH &
BI
PS Manager/Assistant BR
Manager.
BR 30 Review Business Regulation
Procedures and Work Instructions
relevant to internally audited ISO
9001 standards.
1 April 2023
to 31 March
2024
Where resources allow, review BR Procedure and
Work Instructions relevant to ISO 9001 standards.
BR
Service
EH &
BI
Assistant BR Manager/
Quarterly Review. 
BR 31 Customer Satisfaction Surveys  1 April 2023
to 31 March
2024
Review Business Regulation question set for
Customer Satisfaction Surveys
In respect of internally audited ISO 9001 standards.
BR
Service
EH &
BI
Assistant BR Manager.
BR 32 Joint Public Health Protection Plan.  1 April 2023
to 31 March
2024
Participate in training events and work in
partnership with NHS Lanarkshire Health Board and
South Lanarkshire Council, as appropriate.
BR
Service
NHS
LHB
PS Manager/ Assistant BR
Manager.
BR 33 Review of Fees & Charges 1 April 2023
to 31 March
2024
Review Business Regulation Fees and Charges BR
Service
None PS Manager/ Assistant BR
Manager.
BR 34 Planning and building control
consultations
1 April 2023
to 31 March
2024
Ensure planning and building control Service
Requests are actioned as appropriate within the 21
day consultation period.
BR
Service
Built
Env
PS Manager/ Assistant BR
Manager.
Page 262 of 366

Page 263

food safety/occupational health & safety service plan 2023/2024  37 
BR 35 Management Information Systems 1 April 2023
to 31 March
2024
Data management in line with Retention Schedule BR
Service
None PS Manager/ Assistant BR
Manager.
BR 36 Extant Notices 1 April 2023
to 31 March
2024
Review of Extant Notices  BR
Service
None Assistant BR Manager.
BR  37 Template Notices 1 April 2023
to 31 March
2024
Review of Template Notices used by Business
Regulation 
BR
Service
None Assistant BR Manager.
BR  38 Digital NL  1 April 2023
to 31 March
2024
Participate with Digital NL Sprint for Protective
Services as required
BR
Service
CE
Dept
PS Manager/Assistant BR
Manager.
BR 39 Scottish Authority Food Enforcement
Rebuild (SAFER)
1 April 2023
to 31 March
2024 
Participate in FSS SAFER and other working groups as
appropriate
BR
Service
None Assistant BR Manager
BR  40 Internal Monitoring 1 April 2023
to 31 March
2024
Undertake Internal Monitoring in line with Internal
Monitoring Policy & Procedure
BR
Service
None Assistant BR Manager 
APPENDIX 2- STATEMENT OF COMMITMENT BETWEEN LOCAL AUTHORITY AND HSE REGULATORY SERVICES 
Appendix 2 -
Statement of commitm 
APPENDIX 3- TABLES OF CALCULATIONS AND INFORMATION RELATING TO STAFF RESOURCES       
Contents
• Table 1 - Annual Breakdown of Food Law Recovery Plan Interventions Required to Be Carried Out
• Table 2 - Food Law Interventions Recovery- Officer FTE Resource Calculation Per Intervention Category (Recovery Visits Only)
• Table 3 - Estimate of Timescales and Numbers for First Next Programmed Intervention After Food Law Recovery Intervention
• Table 4 - Calculation of Resources Required for First Next Programmed Intervention After Food Law Recovery Intervention
Page 263 of 366

Page 264

food safety/occupational health & safety service plan 2023/2024  38 
• Table 5 - Combined Estimate FTE Resource Calculation Per Annum for Food Law Recovery and Pi Interventions
• Table 6 - Summary of FTE Base Resource Needed to Meet FLRP+ First Recurring Pi Thereafter
• Table 7 - Estimate of Minimum FTE Resource Requirement for Revisit Interventions
• Table 8 - Additional Food Law Interventions Arising from Poor Compliance and From New Businesses
• Table 9 - Estimated Resource Required for Formal Food Enforcement Notices
• Table 10 - Service Requests Resource Summary-Based on A Typical Year Pre-Covid (2018-19)
• Table 11 - Miscellaneous Foreseeable Additional Demands on Service Resource
•  Table 12 - Summary Estimate of Resources Required to Deliver Business Regulation Service Across the Food Law Recovery Period (Oct 2021-Sep 2026)
Appendix 3 - tables
of resource calculation 
APPENDIX 4- UPDATED TABLES OF CALCULATIONS AND INFORMATION RELATING TO STAFF RESOURCES (2023/2024)       
Contents
• Table 1 - Annual Breakdown of Food Law Recovery Plan Interventions Required to Be Carried Out
• Table 2 - Food Law Interventions Recovery- Officer FTE Resource Calculation Per Intervention Category (Recovery Visits and New Premises Visits Only)
• Table 3 - Estimate of Minimum FTE Resource Requirement for Revisit Interventions
• Table 4 - Estimate of Resources Required to Deliver Business Regulation Service Across the Food Law Recovery Period (Oct 2021-Sep 2026)            
Appendix 4  Revision
2023-2024.docx   
APPENDIX 5 – PREMISES OUTWITH FOOD LAW RATING - CALCULATION OF REQUIRED ANNUAL RESOURCE (JUNE 2023) - APPROVED PREMISES, HIGH-RISK GROUP 1 MANUFACTURERS
AND PRIMARY PRODUCERS 
Appendix 5 Revision
2023-2024.docx         
Page 264 of 366

Page 265

North Lanarkshire Council
Report
Environment and Climate Change Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref: AM/VA Date 23/08/23 
Seven Lochs Heritage Project and Partnership 
From  Chief Officer (Community Operations)  
E-mail McPhersonA@northlan.gov.uk Telephone 07939 280467 
Executive Summary 
The Seven Lochs Wetland Park project has been delivering improvements within North
Lanarkshire since 2016.  The council has provided capital funding for improvements and
benefitted from National Lottery Heritage funding at a match of around 63% for these
projects. The lottery funding is coming to an end in December. 
This report summarises the delivery outcomes from the lottery funding in North
Lanarkshire.  The report also presents the collaboration agreement proposed to sustain
the partnership to both protect the lottery investment and to look for further funding streams
to continue improvements. 
Recommendations
It is recommended that committee: 
1) Endorses the successful delivery of heritage improvements across the Seven
Lochs Wetland Park.
2) Endorses the commitment to continue to work in partnership to deliver the
objectives of the Seven Lochs Wetland Park.
3) Approves the council entering into a further collaboration agreement to continue
the partnership work.
4) Continues membership of the Seven Lochs Partnership Board. 
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement
(16) Transform our natural environment to support wellbeing and
inward investment and enhance it for current and future
generations
Item 8
Page 265 of 366

Page 266

1. Background 
1.1 The Seven Lochs Wetland Park is a partnership project receiving funding since 2016
from the National Lottery Heritage Fund. Previous reports to committee in Nov 2016
outlined the National Heritage Lottery Fund (NHLF) award to support the delivery of
the Seven Lochs Wetland Park.  This report gave approval to enter into a partnership
with Glasgow City Council as the project lead and other partners to deliver the project. 
1.2 Country Parks for the Future updates to committee in November 2020 and February
2022 updated committee on aspects of delivery of the Seven Lochs Heritage project 
1.3 The Seven Lochs project had 3 principle aims:
• Develop the Seven Lochs Wetland Park as a new heritage and nature attraction of
national significance.
• Deliver the Seven Lochs Heritage Project, a £6.8 million partnership project
supported by a £4.4million award from the National Lottery Heritage Fund.
• Drive forward the creation of the Seven Lochs Green Network as a high quality
multi-functional network of green spaces. 
2. Report 
2.1 Over the last 6 years the Seven Lochs partnership has effectively delivered a large
scale, multi-partner and cross boundary green network project.  A recent Partnership
review found that all partners had an ongoing interest in the sustainable management
and further development of the wetland park and green network and are committed to
ongoing involvement through a renewed collaboration agreement. 
Project outcomes in North Lanarkshire  
2.2 Drumpellier Country Park 
• Visitor centre extension & refurbishment including updated interpretation
both internal and external to the visitor centre.
• An impactful heritage and nature themed crannog adventure play are
• Wildlife tower with wildlife cameras to link to interpretation 
• Floating habitat islands on Lochend loch
• Peatland restoration 
2.3 Gartcosh Local Nature Reserve
• New amphibian ponds 
• Hibernacula 
• Hedgerow and woodland management 
2.4 Frankfield Loch
• Improvements to habitat specifically for water vole populations
• Woodland habitat improvement
• Installation of bird and bat boxes to enhance roosting opportunities
• Improved interpretation for the proposed LNR (to be designated jointly
with Glasgow in 2023) 
2.5 Glenboig Village Park
• Improved interpretation and some sculptural seating to interpret the
brickworks history of the local area in partnership with Glenboig
Development Trust 
Page 266 of 366

Page 267

2.6 Area wide improvements 
• The development and delivery of the 7 lochs trail across the wider wetland
park, which is signposted from Hogganfield Loch in Glasgow to
Drumpellier Country Park and links to transport nodes.
• Volunteering and employability opportunities created in conjunction with
TCV and our own countryside ranger service for people to volunteer at
various sites across the project area and make improvements to habitat
networks in our much loved and valued greenspaces. 
• Production of a Conservation Action Plan for water voles within the area
• Production of a Seven Lochs Design Guide to encourage developers to
support the aims of the wetland park and to inform high quality design.     
Project Sustainability 
2.7 The previous Seven Lochs collaboration agreement expired in June 2023.  A
requirement of the NHLF grant is to put in place sustainable structures to safeguard
management of the heritage resource invested in for the period of the 20-year grant
maintenance period. 
2.8 The new collaboration agreement is for 20 years with reviews every 5 years.  Partner
roles are updated to focus on sustaining, developing, and delivering projects and
activities in the Seven Lochs Wetland Park. 
2.9 To date funding has been secured to continue the staff team (hosted by Glasgow City
Council) and the Conservation Volunteers until March 2025. The council has
contributed £50K from parks funding to focus on delivering community engagement
and volunteering.   A key role for the staff team will be to continue to secure additional
funding routes for the project, particularly for improved habitats, access networks and
green infrastructure. 
2.10 The staff team will also assess how the wetland park can contribute to the Scottish
Government’s 30x30 target to protect 30% of Scotland’s habitats for nature by 2030. 
Any proposed designations for the wetland park will be brought back to committee. 
3. Measures of success 
3.1  Seven Lochs Collaboration agreement entered into for a further 20 years. 
3.2 Continued delivery of volunteering and site improvements in the Seven Lochs area.
4. Supporting documentation 
Appendix 1 - Seven Lochs collaboration agreement 
Andrew McPherson 
Chief Officer (Community Operations) 
Page 267 of 366

Page 268

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Legal have reviewed the Collaboration agreement and are content that it is
appropriate for the council to enter into
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒
Page 268 of 366

Page 269

If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The 7 Lochs project has delivered many environmental improvements in the area
over the last 6 years and the partnership aims are to continue to deliver nature
network improvements
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 269 of 366

Page 270

Appendix 1 Collaboration Agreement 
Seven Lochs Collaboration Agreement 
between: 
1. Glasgow City Council, established under the Local Government etc (Scotland) Act
1994 and having its chief office at City Chambers, Glasgow, G21DU (hereinafter
referred to as “GCC”)
and 
2. North Lanarkshire Council, established under the Local Government etc (Scotland)
Act 1994 and having its chief office at Civic Centre, Windmillhill Street, Motherwell,
ML11AB (hereinafter referred to as “NLC”)
and 
3. The Conservation Volunteers (Scotland ), charity number SCO39302 who’s
registered office is at Sedum House, Mallard Way, Doncaster, South Yorkshire, DN4
8DB (hereinafter referred to as “TCV Scotland”)
and
4. Glenboig Development Trust, Scottish Charitable Incorporated Organisation charity
number SCO046147 who’s registered office is at Glenboig Life Centre, Main St,
Glenboig, ML5 2RD (hereinafter referred to as “GDT”)
and
5. Provan Hall Community Management Trust, Scottish Charitable Incorporated
Organisation charity number SCO047978 who’s registered office is at Provan Hall,
Auchinlea Rd, Glasgow, G34 9PQ (hereinafter referred to as “PHCMT”)
and
6. R&A Championships Ltd, a private limited company incorporated in Scotland under
company number SC247047 and who’s registered office is at Beach House, Golf
Place, St Andrew’s, Fife, KY16 9JA (hereinafter referred to as “R&A”). 
Each a “Party” and collectively “the Parties” 
Page 270 of 366

Page 271

WHEREAS: 
The Parties shall work together to deliver and further develop the Seven Lochs Project, which
includes the sustainable management and improvement of the Seven Lochs Wetland Park as
a high-quality visitor attraction, and the development and management of a wider Seven Lochs
Green Network extending from the wetland park into surrounding communities. 
The Parties therefore agree as follows: 
Definitions and Interpretation 
In this Agreement unless the context otherwise requires, the following expressions shall have
the following meanings assigned to them: 
"Agreement" means this agreement including the Schedules. 
“Board” means representatives of the Parties responsible for the overall strategic
management and delivery of the Seven Lochs Project, and which shall include, in addition to
the representatives, an elected member from GCC and NLC. 
“Contribution Agreement” means those project agreements to be entered into by the parties
which will prescribe the manner and circumstances in which one party will pay to other parties
a share of funding held to deliver Seven Lochs Project activities, and the Terms and Conditions
under which the funding will be administered. 
“Chairperson” means a member of the Partnership Board, Project Team or working group
elected or appointed to oversee the running of project meetings. 
“Green Network” means a high quality, multi-functional network of open spaces and green
corridors. 
“Data Protection Law” means the law relating to data protection, the processing of personal
data and privacy from time to time. 
“Project Team” means those persons appointed by the parties to coordinate the day-to-day
operation of the Seven Lochs Project.
Page 271 of 366

Page 272

“Seven Lochs Project” means the overall project for the development of the Seven Lochs and
includes capital projects and activity programmes that have been approved in principle by the
Parties to this agreement. 
“Seven Lochs Wetland Park” means the area of approximately 16.8 km square identified as
the area bounded in green on Figure 1 as included in Schedule 1. 
"Schedule" means a schedule appended to and forming part of this Agreement. 
“UK GDPR” means the retained EU law version of the General Data Protection Regulation
((EU) 2016/679). 
Reference to any statute or statutory provision shall include a reference to any statute or
statutory provision which amends, extends, consolidates or replaces the same (save to the
extent that any amendment, extension, consolidation or replacement would impose more
onerous obligations than otherwise exist at the date on which this Agreement is executed by
the Parties) or which has been amended, extended, consolidated, or replaced by the same
and shall include any orders, regulations, instruments or other subordinate legislation made
under the relevant statute or statutory provision.
The singular includes the plural and vice versa and any gender includes all genders.
The headings are inserted for convenience only and shall not affect the construction of this
Agreement. 
If there is any inconsistency or conflict between the terms of the Clauses and the Schedules
then the terms of the contract clauses shall prevail. 
1. PURPOSE 
1.1 the purpose of this agreement is to set out how Parties shall work together to manage the
development and delivery of collaborative projects and joint activities that make up the
overall Seven Lochs Project. 
1.2 this Agreement will continue for 20 years from the first of January 2024, with a review of the
purpose, objectives, membership and structure every 5 years. 
Page 272 of 366

Page 273

1.3 the parties may bring the Agreement to an end at an earlier date with the consensus of all
Parties at a meeting of the Board. 
2. OBJECTIVES FOR THE PROJECT 
2.1  the Parties shall work together to manage, maintain and improve the Seven Lochs
Wetland Park as a heritage and nature park and outdoor activity attraction of national
significance. 
2.2.  the Parties shall drive forward the creation of the Seven Lochs Green Network
(hereinafter referred to as “the Green Network”), a high quality, multi-functional network
of open spaces and green corridors. 
2.3 the Parties shall develop and deliver new collaborative projects and joint activities with
reference to the Seven Lochs vision and masterplan, the Seven Lochs Green Network
Strategy, and the Seven Lochs Landscape Conservation Action Plan and such other
new plans and strategies which amend, supplement or supersede these as may be
approved by the Board during the term of this Agreement. 
2.4 the Parties shall seek, secure and manage partner and external grant funding for the
Seven Lochs Project as further detailed in clause 6 and shall ensure compliance with
the funding terms and conditions of partners and external funders . 
3. STRUCTURE AND MEMBERSHIP 
3.1 there shall be a Board and a Project Team. The Parties shall nominate representatives
to the Board and Project Team as set out in Clause 5 of this Agreement. The members
of the Board shall be elected representatives, senior managers, or Board members
from the Parties to this agreement. The members of the Project Team shall be
operational officers from the Parties to this agreement. The Board may invite advisors
from other organisations to join the Project Team to provide expert advice on any
matter which may arise. 
3.2 the Board shall be responsible for overseeing the strategic direction and overall
management and delivery of the Seven Lochs Project. The quorum of the Board shall
be 5. 
Page 273 of 366

Page 274

3.3 the Project Team shall be led and co-ordinated by the Board. It shall be responsible
for operational delivery of Seven Lochs Project activities as directed by the Board. 
3.4 the Project Team directed by the Board shall:
• have a clear work programme, milestones and outputs;
• have responsibility for decision-making on specific matters where this has been
delegated by the Board;
• report to the Board. 
3.5 both the Board and the Project Team may agree to establish working groups for the
purpose of advising them on either topic-based or area-based matters. Working groups
shall comprise of any individual within any of the Parties or other relevant organisations
who the Board or Project Team agree shall enable the working group to fulfil its role. 
3.6 working groups shall:
• have clear terms of reference and duration as directed by the Board or Project
Team;
• have responsibility for decision-making on specific matters where this has been
delegated by the Board;
• report to the Board or Project Team as required. 
3.7 changes to the structure of the Board and Project Team shall be approved by a simple
majority of the Board. Changes will be circulated in writing to all Parties with any
accompanying changes required to the Board responsibilities. 
3.8 the Board and Project Team shall each meet quarterly, or more regularly as agreed by
the Board, to allow decisions to be taken as required. Procedures for the administration
of meetings are detailed in Section 7. 
3.9 Board and Project Team members may nominate a substitute representative to attend
meetings on occasions where absence can be reasonably foreseen.  Where a
substitute is required to attend on behalf of a Board or Project Team member, that
member shall ensure that the substitute is adequately briefed in advance of the
meeting. 
3.10 in the event that a representative of one of the Parties fails to attend three consecutive
Board or Project Team meetings the Chairperson of the Board shall write to the Party
notifying them of the continued absence.  If this absence continues the Party shall be
asked to nominate an alternative representative to sit on the Board.
Page 274 of 366

Page 275

3.11 any member of the Board who is directly or indirectly interested in any matter brought
up for consideration at a meeting shall disclose the nature of their interest to the
meeting and shall not participate in the discussion or the decision-making process if it
is a direct interest. Board members should notify the Chairperson in advance if any
matter on the agenda necessitates their absence from discussion of any particular
item(s) in order that business on the agenda can be managed accordingly. 
3.12 additional members invited to become parties to this Agreement shall sign a deed of
accession. 
3.13 in the event of any disagreement between the Parties the matter will be brought to the
Board’s attention for resolution. 
4. ADMINISTRATION OF MEETINGS 
4.1 the following shall be adopted as standard procedures for meetings of the Board,
Project Team and working groups:
• decisions shall be made through consensus, however, if this cannot be achieved
then decisions shall be made by a simple majority vote, with the Chairperson
having a casting vote;
• members of the Board may request inclusion of items for discussion in Board and
Project Team meeting agendas (except in the case of working groups);
• agendas shall be drafted by GCC staff in collaboration with the Chairperson of the
relevant group and in consultation with the Parties
• the agenda, papers and previous minutes for all meetings shall be distributed 7
days in advance of a meeting;
• the Board agenda shall include a report from the Project Team as a standing item,
which shall contain information on progress against milestones and outputs,
project management, and risks to the delivery of the project;
• minutes shall be kept of all meetings, and agendas, papers and approved minutes
of meetings shall be available to the public. 
4.2 the Board shall be responsible for ensuring provision of administrative support
services, facilities for meetings of the Board and, at its discretion, for meetings of
working groups. 
5. ROLES AND RESPONSIBILITIES OF PARTIES 
Page 275 of 366

Page 276

5.1 Glasgow City Council (GCC) shall have the following roles and responsibilities:
• GCC shall act as lead agency responsible for ensuring the financial administration
and financial management of the Seven Lochs Project in accordance with partner
and funder requirements and in line with procedures for drawing down external
grant awards.
• GCC shall nominate an elected member and a senior officer to represent GCC on
the Board; the key decision-making body. The GCC elected member shall be
Chairperson of the Board.
• GCC shall nominate an operational officer to the Project Team to co-ordinate
appropriate resource input to the Seven Lochs Project.
• GCC shall have lead responsibility for delivering projects and activities at GCC
sites within the Seven Lochs Project area during the period of this agreement.
• GCC shall provide advice, assistance and support on the delivery of the Seven
Lochs Project and associated activities as appropriate.
• GCC shall enter into Contribution Agreements with the other parties as and when
required. 
5.2 North Lanarkshire Council (NLC) shall have the following roles and responsibilities:
• NLC shall nominate an elected member and a senior officer to represent NLC on
the Board; the key decision-making body. The NLC elected member shall be vice-
chairperson of the Board.
• NLC shall nominate an operational officer to the Project Team to co-ordinate
appropriate resource input to the Seven Lochs Project.
• NLC shall have lead responsibility for delivering projects and activities based at
NLC sites within the Seven Lochs Project area during the period of this agreement.
• NLC shall provide advice, assistance and support on the delivery of the Seven
Lochs Project and associated activities as appropriate.
• NLC shall enter into Contribution Agreements with GCC as and when required in
respect of those projects to be delivered within the boundary area of NLC. 
5.3  The Conservation Volunteers Scotland (TCV Scotland) shall have the following
roles and responsibilities:
• TCV Scotland shall nominate a senior officer to represent them on the Board.
• TCV Scotland shall nominate an operational officer to the Project Team to co-
ordinate appropriate resource input to the Seven Lochs Project.
• TCV Scotland shall provide advice, assistance and support on the delivery of the
Seven Lochs Project and associated activities as appropriate. 
5.4  Glenboig Development Trust (GDT ) shall have the following roles and
responsibilities:
• GDT shall nominate a senior officer or trustee to represent them on the Board.
• GDT shall nominate an operational officer to the Project Team to co-ordinate
appropriate resource input to the Seven Lochs Project.
Page 276 of 366

Page 277

• GDT shall have lead responsibility for delivery of projects and activities at Glenboig
Life Centre.
• GDT shall provide advice, assistance and support on the delivery of the Seven
Lochs Project and associated activities as appropriate. 
5.5  Provan Hall Community Management Trust (PHCMT) shall have the following roles
and responsibilities:
• PHCMT shall nominate a senior officer or trustee to represent them on the Board.
• PHCMT shall nominate an operational officer to the Project Team to co-ordinate
appropriate resource input to the Seven Lochs Project.
• PHCMT shall have lead responsibility for delivery of projects and activities at Provan Hall
under the terms of a lease agreement with GCC.
• PHCMT shall provide advice, assistance and support on the delivery of the Seven
Lochs Project and associated activities as appropriate. 
5.6  R&A Championships Ltd (R&A) shall have the following roles and responsibilities
during the delivery phase:
• R&A shall nominate a senior officer to represent them on the Board.
• R&A shall nominate an operational officer to the Project Team to co-ordinate
appropriate resource input to the Seven Lochs Project.
• R&A shall have lead responsibility for delivery of projects and activities at Golf-It
Glasgow.
• R&A shall provide advice, assistance and support on the delivery of the Seven
Lochs Project and associated activities as appropriate. 
6. FUNDING 
6.1 the Parties agree to commit funding, subject to securing any necessary internal
approvals, to support the delivery of the project. 
6.2 the Parties commit to assisting with grant funding applications for the Seven Lochs
Project where appropriate, subject to securing any necessary internal approvals. 
6.3 the Parties may make individual funding applications without prior Board approval
where the purpose of such funding aligns with the strategic direction and delivery of
the Seven Lochs Project. 
6.4 the Parties will work together to identify and develop sustainable income streams that
can help support the long-term, sustainable management of the Seven Lochs Wetland
Park and Green Network.
Page 277 of 366

Page 278

7. PUBLIC RELATIONS 
7.1 any press releases or other public statements in relation to the working of the Parties
in terms of this agreement shall be prepared in collaboration with the Board. 
7.2 Promotion of the Seven Lochs Project and the Seven Lochs Wetland Park shall be
carried out in accordance with procedures required by funders as a condition of grant
award. 
8. ACCEPTANCE 
8.1 the Parties by their execution hereof, accept and agree to be bound by the terms set
out in this Agreement. Each party shall receive a copy of the fully signed Agreement. 
9. AMENDMENTS 
9.1 any amendments to this Agreement must be formally agreed in writing and signed by
all the Parties. 
10 NO PARTNERSHIP 
10.1 for the avoidance of doubt it is expressly stated that the entering of this agreement
does not constitute a legal partnership, joint venture or agency amongst the
participants. No Party shall have any authority to make any commitments on another
Party's behalf unless otherwise outlined in this Agreement 
11 DATA PROTECTION AND FREEDOM OF INFORMATION 
Data Protection 
11.1  All Parties will comply with the applicable requirements of Data Protection Law to the
extent they apply to any activities under this Agreement. 
Page 278 of 366

Page 279

11.2 The Parties agree that it is their mutual expectation that they will not share personal
data with each other under this Agreement. In the event that, contrary to this mutual
expectation, personal data is shared then the following provisions of this Clause shall
apply in the event that the Parties do not agree in writing any express provisions
regulating such processing. 
11.3 To the extent that any Party discloses personal data to another Party it will ensure that
such disclosure is fair, lawful and transparent in the context of the purposes for which
the personal data is to be processed by the receiving Party and otherwise complies
with the requirements of Data Protection Law. 
11.4 Without prejudice to Clause 24.2, if any Party ("Processor”) acts as a processor of
personal data for any other Party ("Controller") in relation to any activities under this
Agreement then: 
11.4.1 the Processor shall process such personal data only for the purposes of this
Agreement and subject to any express written instructions of the Controller
from time to time, and otherwise on such terms relating to the processing as
the Controller may reasonably specify in writing; 
11.4.2 the Processor shall assist the Controller in complying with its obligations under
Data Protection Law and in demonstrating such compliance, including by
documenting and agreeing in writing any particular aspects of the processing
and providing such information in relation to the processing, to the extent
reasonably required to do so by the Controller; and 
11.4.3 the provisions of Articles 28.2, 28.3 (a) to (h) and 28.4 of the UK GDPR shall
be incorporated into this Agreement mutatis mutandis by way of direct
contractual obligation on the part of the Processor to the Controller. 
Freedom of Information
11.5 Subject to clause 11.6, if any Party to this Agreement which is subject to the Freedom
of Information (Scotland) Act 2002 (“FOISA”) or the Environmental Information
(Scotland) Regulations 2004 (“the EIRs”), receives a request for information under
FOISA or, if applicable, under the EIRs (or any statutory amendment or re-enactment
thereof), that Party may seek the input of any of the other Parties to this Agreement in
relation to responding to said request.   Such other parties shall work in a collaborative
manner with the Party in receipt of the request to provide such assistance as may
reasonably be required by that Party in order to respond to the request for information. 
Page 279 of 366

Page 280

11.6 In all cases the Party in receipt of the request under FOISA or the EIRs may, without
consent of any of the other Parties, disclose any of the requested information if that
Party (acting reasonably) is satisfied that it is in the public interest to do so.  In reaching
this conclusion the relevant Party shall take into account any representation made in
connection to the request for information by any other Party but the decision of the
Party in receipt of the request as to what constitutes public interest shall be final and
conclusive in any dispute, difference or question arising in respect thereof. 
12. CORRUPT GIFTS OR PAYMENTS 
12.1 the Parties shall not offer or give, or agree to give, to anyone associated with the
project, employee or representative of the Council any gift or consideration of any kind
as an inducement or reward for doing or refraining from doing or for having done or
refrained from doing, any act in relation to the obtaining or execution of this or any
other agreement with any Party  or for showing or refraining from showing favour or
disfavour to any person in relation to this or any such agreement. 
12.2 the Parties shall not engage in any activity, practice or conduct which would constitute
an offence under sections 1, 2 or 6 of the Bribery Act 2010. 
12.3 the Parties shall maintain in place adequate procedures designed to prevent any
associated person from undertaking any conduct that would give rise to an offence
under section 7 of the Bribery Act 2010. 
12.4  the Parties undertake to use reasonable endeavours to procure that its agents (in such
capacity), officers and employees adhere to the obligations as are placed on The
Parties by virtue of, and contained in, this clause as if they were a party hereto. 
12.5 the Parties shall provide any information reasonably requested by the Council in
relation to their compliance with this clause. 
12.6 breach of the above provisions shall be construed as a material breach of this
Agreement incapable of being remedied. 
13. ASSIGNATION AND TRANSFER
13.1 Subject to the exception in Clause 13.2, no Party may, unless the prior written consent
of all of the other Parties has been obtained (such consent not to be unreasonably
delayed, withheld or made subject to unreasonable conditions):
13.1.1 assign any of its rights under this Agreement;
13.1.2 transfer any of its obligations under this Agreement; or
13.1.3 sub-contract or delegate any of its obligations under this Agreement. 
Page 280 of 366

Page 281

13.2 A Party may assign any of its rights or transfer any of its obligations under this
Agreement to a statutory successor without the consent of the other Parties. 
14. THIRD PARTY RIGHTS
14.1 A person who is not a party to this Agreement has no right under the Contract (Third
Party Rights) (Scotland) Act 2017 to enforce or to enjoy the benefit of any term of this
Agreement. Nothing in this Agreement, whether express or implied, is intended or shall
be construed to confer, directly or indirectly, upon or give to any person, other than the
Parties hereto, any right, remedy or claim under or in respect of this Agreement or any
undertaking, condition or other provision contained herein. 
15. CONFIDENTIALITY
15.1 Subject to clauses 15.3 and 15.4, any information supplied by one Party (“the supplying
Party”) to any other Party (“the receiving Party”) shall be kept confidential and shall
only be used for the performance of the receiving Party’s obligations under this
Agreement.  
15.2 Upon request, and in any event upon expiry or termination of the Agreement for
whatever reason, the receiving Party shall destroy forthwith (or at the supplying Party’s
written request, return forthwith to the supplying Party) any information provided by the
supplying Party pursuant to the Agreement.
15.3 The receiving Party may disclose the supplying Party's confidential information:
15.3.1 as may be required by law (including under FOISA or the EIRs), a court of
competent jurisdiction or any governmental or regulatory authority; or
15.3.2 where such information requires to be disclosed to a provider of grant funding
for the Seven Lochs Project in accordance with the requirements of any grant
funding agreements, providing that the receiving Party provides the supplying
Party with reasonable notice of such disclosure.
15.4 The provisions of this Clause 15 shall not apply to any information that:
15.4.1 is available or becomes generally available to the public (other than as a result
of its disclosure in breach of this Clause 15); or
15.4.2 was available to the receiving Party on a non-confidential basis before
disclosure by the supplying Party; or 
15.4.3 was, is or becomes available to the receiving Party on a non-confidential basis
from a person who, to the receiving Party’s knowledge, is not bound by a
confidentiality agreement with the supplying Party or otherwise prohibited from
disclosing the information to the receiving Party; or
15.4.4 the Parties agree in writing is not confidential or may be disclosed; or 
15.4.5 is developed by the receiving Party independently from the information
Page 281 of 366

Page 282

disclosed by the supplying Party.
16. SEVERENCE
16.1 If any provision of this Agreement is held to be invalid or unenforceable by any judicial
or other competent authority, all other provisions of this Agreement will remain in full
force and effect and will not in any way be impaired.
16.2 If any provision of this Agreement is held to be invalid or unenforceable but would be
valid or enforceable if some part of the provision were deleted, the provision in question
will apply with the minimum modifications necessary to make it valid and enforceable. 
17. SCOTS LAW 
17.1 this Agreement shall be interpreted according to and shall receive effect according to
the Law of Scotland and the parties hereto subject to the exclusive jurisdiction of the
Scottish Courts. IN WITNESS WHEREOF these presents typewritten on this, and the
preceding 6 pages and the Schedules annexed to this Agreement are subscribed as
follows:- 
Page 282 of 366

Page 283

On behalf of Glasgow City Council 
By _______________________________________________ 
At _______________________________________________ 
On _______________________________________________ 
Before the following witness 
Name _________________________________________ 
Signature ______________________________________ 
Page 283 of 366

Page 284

IN WITNESS WHEREOF these presents are subscribed as follows: 
On behalf of North Lanarkshire Council 
By _______________________________________________ 
At _______________________________________________ 
On _______________________________________________ 
Before the following witness 
Name _________________________________________ 
Signature ______________________________________ 
Page 284 of 366

Page 285

IN WITNESS WHEREOF these presents are subscribed as follows: 
On behalf of The Conservation Volunteers (Scotland) 
By _______________________________________________ 
At _______________________________________________ 
On _______________________________________________ 
Before the following witness 
Name _________________________________________ 
Signature ______________________________________ 
Page 285 of 366

Page 286

IN WITNESS WHEREOF these presents are subscribed as follows: 
On behalf of Glenboig Development Trust 
By _______________________________________________ 
At _______________________________________________ 
On _______________________________________________ 
Before the following witness 
Name _________________________________________ 
Signature ______________________________________ 
Page 286 of 366

Page 287

IN WITNESS WHEREOF these presents are subscribed as follows: 
On behalf of Provan Hall Community Management Trust 
By _______________________________________________ 
At _______________________________________________ 
On _______________________________________________ 
Before the following witness 
Name _________________________________________ 
Signature ______________________________________ 
Page 287 of 366

Page 288

IN WITNESS WHEREOF these presents are subscribed as follows: 
On behalf of R&A Championships Ltd 
By _______________________________________________ 
At _______________________________________________ 
On _______________________________________________ 
Before the following witness 
Name _________________________________________ 
Signature ______________________________________ 
Page 288 of 366

Page 289

OFFICIAL 
OFFICIAL   
THIS IS SCHEDULE 1 TO THE FOREGOING COLLABORATION AGREEMENT BETWEEN
GLASGOW CITY COUNCIL, NORTH LANARKSHIRE COUNCIL, THE CONSERVATION
VOLUNTEERS (SCOTLAND), GLENBOIG DEVELOPMENT TRUST, PROVAN HALL COMMUNITY
MANAGEMENT TRUST AND R&A CHAMPIONSHIPS LTD.
Page 289 of 366

Page 290

SCHEDULE 1
Figure 1 – Seven Lochs Wetland Park
Page 290 of 366

Page 291

Page 291 of 366

Page 292

Page 292 of 366

Page 293

1 
North Lanarkshire Council
Report
Environment and Climate Change Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref     Date 05/06/23 
Winter Service Policy and Procedures 2023/24 
From  Andrew McPherson  
E-mail mcphersona@northlan.gov.uk Telephone 07939 280467 
1. Background 
1.1 Under Section 34 of the Roads (Scotland) Act, 1984, North Lanarkshire Council has a
statutory obligation to take such steps as it considers reasonable to prevent snow and
ice endangering the safe passage of pedestrians and vehicles over their public roads
which by definition includes carriageways, footways and footpaths. 
Executive Summary 
This report presents Elected Members with details of the proposed Winter Service Policy
and Procedures for 2023/24.  The council has an obligation under the Roads (Scotland)
Act 1984 to take such steps as it considers reasonable to prevent snow and ice
endangering safe passage of pedestrians and vehicles over public roads. This obligation
is discharged through the council’s term maintenance contract with our Limited Liability
Partners, Amey Public Services (APS). To ensure that these obligations are met the council
is required to annually review its processes and procedures and approve an annual refresh
of its policy. 
Recommendations
It is recommended that the Environment and Climate Change Committee: 
(1) Considers the contents of this report and accompanying appendix.
(2) Agrees the proposed Winter Service Policy and Procedures 2023/24 as the base for
winter service delivery in the coming year.
(3) Acknowledges the outcome from the member/officer working group on Grit Bins and
Community Resilience. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (17) Ensure we keep our environment clean, safe, and attractive
Item 9
Page 293 of 366

Page 294

2 
1.2 This does not mean that all roads and footways must be treated as soon as ice
formations or snow accumulations exist. To do so would be impossible and out with the
limit of the resources available, and the Courts have recognised that it would not be
reasonably practical to do so. Nevertheless, to deal efficiently and effectively with winter
events, operations need to be planned in a systematic manner and it is therefore
essential that a policy with clearly defined priorities is established. 
1.3 The policy outlines how the winter service will be delivered across the council and how
the road network has been prioritised for carriageways, footway, footpaths and cycle
routes. The policy also details the levels of service that are to be achieved and
procedures around the winter decision making process. 
2. Report 
2.1 The Winter Service provided by the council takes cognisance of the recommendations
in the document Code of Practice ‘’Well-Managed Highway Infrastructure (2018)’’ for
Highway Maintenance Management.  Winter Service reviews are undertaken annually
to determine how the service can be improved with the resources available. A
contingency plan has been prepared for extreme weather events. 
2.2 Plans indicating the Primary and Secondary roads within each ward will be circulated
to Local Members and relevant information placed on the council web site. Copies of
the document will also be distributed to those listed in Appendix C of the document. 
Overview of Weather Conditions Over Previous Year 
2.3 In terms of the weather conditions through the winter period, October was a very mild
and wet month. The mean temperature was 1.5 to 2.5 degrees Celsius above the
monthly average.  October was also relatively wet with rainfall 25% to 50% above the
average for the time of year and 75% above in a few areas. Road Surface temperatures
remained well above zero the entire month. 
2.4 November was also very mild with temperatures close to 2 degrees Celsius above the
long-term average.  Air temperature peaked at 16.4c making it in the top five warmest
Novembers in Scotland since records began.  Precipitation amounts were near the 30-
year normal for the month.  Road surface temperatures were predominately above
zero, except for a few nights. 
2.5 December was a cold month with the mean temperature close to 1.5 degrees Celsius
below the 30-year average and was the coldest since 2010.  A band of accumulating
snow passed across the northern part of the region on the morning of the 16th.  Snow
amounts were generally 2 to 5cm with some reaching 10cm. 
2.6 January was interchangeable with mild conditions at the start and end and a cold spell
in the middle of the month. 
2.7 February was a quiet month for winter roads, it was very mild with mean temperatures
averaging 2 degrees Celsius above the 30-year normal.  It was also drier than normal
with only 70% of the normal rainfall. Road Surface temperatures were mainly above
zero with temperatures falling below zero towards the end of the month. 
2.8 March was interchangeable with the second week of the month being a particularly cold
week. 
Page 294 of 366

Page 295

3 
Winter Service Review 
2.9 Winter Service reviews are undertaken annually to determine how the service can be
improved with the resources available.  A review of the winter period was undertaken
on the 31 May 2023 in conjunction with the council’s partners APS which covered a
range of items such as fleet, operations, monitoring of service, resources, health, and
safety etc.  The key points are detailed further below. 
2.10 The current partnership with APS operates a multi-functional fleet meaning that
vehicles can be used for both traditional road works and winter services.  APS continue
to renew older fleet as it reaches end of life. During this period APS brought in 4
additional Muli- Purpose Vehicles which increased their resilience with a further 2 fleet
vehicles to be replaced this year prior to the winter period of 2023/24. Once again, the
summer servicing of the tractor fleet had a very positive impact which helped limit
mechanical failures.  The new tractor unit replacement program was completed prior to
the start of the Winter period, with a move to the John Deer model. The performance
of the tractors was closely monitored by North Lanarkshire Council and APS and it was
found that following some minor adjustments to the plough facility on the tractors, their
overall performance was good.   
2.11 APS continue to maintain a sufficient driver resource and reported a positive upturn in
the recruitment of qualified drivers.  They also continue to maintain high standards of
driving via their Driver Certificate of Professional Competence (DCPC) training
program. 
2.12 During the winter period we experienced no systems failure with the forecasting
information. However, on one occasion the domain forecast dropped below zero very
briefly and North Lanarkshire Council was not informed.  This matter was immediately
brough to the attention of providers and was discussed at the West of Scotland Local
Authority weather consortium meeting and assurances given by the provider that
measures were put in place to avoid a reoccurrence. 
Weather Station Improvements 
2.13 As part of the winter service and to assist in the forecasting of conditions, the council
operates five weather stations at the A803 Kilsyth, B7066 Hirst, A73 Brownshill, A73
Stand, and Sikeside Street, Coatbridge.  The weather stations provide a range of
information including road surface temperature, road condition, wind speed etc. and
the A803 Kilsyth is currently the only station not fitted with a camera to enable real time
information to be viewed by decision makers. 
2.14 The weather station at the A803 Kilsyth is a solar power station and as such it was not
possible to have a camera as part of this site.  This weather station is now at the end
of its life, and it is proposed to relocate the station to enable a power connection which
would allow a camera to be installed when the site is upgraded.  It is proposed that this
work will be completed this calendar year and both stations will operate in tandem to
enable a comparison of data to be undertaken. 
2.15  To further enhance the available road condition information it is proposed to install a
new a Groundcast (underground) and Tempcast (above ground) sensor which will be
located on the A89 Airdrie Road – East of Raiziehill Farm, within the east domain.  The
sensor will operate for a period of three years and help inform whether an additional
weather station in the east domain would help improve forecasting information and
service delivery. 
Page 295 of 366

Page 296

4 
Route Forecasting Trial 
2.16 During the 2022/23 Winter period North Lanarkshire Council undertook a trial to
compare route-based forecasting with the current domain-based forecasting method,
which currently drives our Winter treatment decision making. We found that compared
to the domain forecasts, the route-based forecasts were high granularity forecasts
which allowed a more targeted treatment of the Network.  They shared the same
methodology as the domain-based forecasting that we currently use but benefited from
advances in higher resolution modelling providing us with the ability to highlight specific
route sections with colder road surface temperatures, which from an operational
perspective allowed winter treatment decisions to be made on a route-by-route basis
on a wider forecast area. When the results between the actual treatments carried out
using domain-based forecasting and the hypothetical treatments using the route-based
approach were compared, the most noticeable difference in winter treatments was
during spells of marginal weather forecasts. During these periods the number or
treatments, salt use, length of network treated, and the length of network travelled
decreased. It is hoped that by adopting the route-based forecasting approach the
savings that could be achieved will fall within the range of 6 – 15% in salt and fuel
usage, depending on the climatological efficiency of the routes.  This would have a
positive impact on the environment and carbon reduction targets through reduced salt
usage and network length travelled.  It is proposed that the actual treatments will
continue based on the domain-based forecasts during winter 2023/24 however we will
continue the trial to monitor and assess the route-based system further. 
Member/ Officer Working Group 
2.17 Following the Environment and Place Committee of 24 August 2022, it was agreed that
a member officer working group would be established to review the allocation of salt
bins throughout the Council area and determine how to maximise community resilience. 
2.18 There were two meetings of the working group in March and June of 2023. A full report
on these meetings are contained within Appendix 2 but the following actions were
identified by the group to be taken forward and an outcome from these will be reported
to Committee as part of the next Winter Service Policy report: 
• Acknowledge the position around providing additional information for the
treatment of schools before the next winter period.
• Agreed the proposed decision matrix for inclusion in the Winter Service Policy
and Procedures 2023/24 and the application of the criteria for outstanding
requests from 2022/23.
• Agreed that robust data is gathered over the next winter period regarding grit
bin use.  This will be reported as part of the approval for the Winter Service
Policy and Procedures 2024/25, including options for rationalisation.
• Housing Services and the Community Partnership Team will continue to liaise
with community groups to encourage the use of local grit bins and grow
community resilience. 
3. Measures of success 
Page 296 of 366

Page 297

5 
3.1  The road network is generally available for residents, commerce and blue light services
to use safely throughout the winter period enhancing North Lanarkshire as the place to
live, learn, work, invest and visit.   
4. Supporting documentation 
Appendix 1 –  Winter Service Policy and Procedures 2023/24 
Appendix 2 –  Reporting detailing the discussions and outcome of the member/ officer working
group for grit bins and community resilience. 
Andrew McPherson
Chief Officer (Community Operations) 
Page 297 of 366

Page 298

6 
5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
The replacement cost of the weather station is around £36k and the new sensors
will cost around £6,600 with additional costs for a Scottish Power connection. 
These costs will be met from the Roads Winter budget. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 298 of 366

Page 299

7 
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Potential reduction in carbon reduction through use of route forecasting trial.
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 299 of 366

Page 300

8 
APPENDIX 1
Contents                                                                                                         Page No 
1.  INTRODUCTION         2 
2.  POLICY         
2.1  Treatment of Roads       3 
2.2  Salt Stock Levels       5   
2.3 Level of Service       5 
3.  PROCEDURES 
3.1 Preparation of Routes       6 
3.2  Meteorological Reports      6 
3.3  Decision Making Process      7 
3.4  Resources        8 
3.5  Road Condition Reports      8 
3.6  Liaison with Police       9 
3.7  Warning Signs        9   
3.8  Road Closures        9 
3.9  Salt Bins        9 
3.10 Community Salt Stocks      10 
3.11  Keeping and Retention of Records     10 
Appendix 'A'  - Plan of Council Areas       11 
Appendix 'B'  - Office and Contact Details      12 
Appendix 'C'  - Distribution List       12 
Appendix 'D'  - Salt bin decision matrix      13 
Page 300 of 366

Page 301

9 
NORTH LANARKSHIRE COUNCIL 
WINTER SERVICE 
1. INTRODUCTION 
Under Section 34 of the Roads (Scotland) Act, 1984, North Lanarkshire Council has a
statutory obligation to take such steps as it considers reasonable to prevent snow and
ice endangering the safe passage of pedestrians and vehicles over their public roads
which by definition includes carriageways, footways and footpaths. 
The A725, A8 trunk roads and the M73, M8, M80 and M74 motorways are the direct
responsibility of the Scottish Government.   
It is the aim of North Lanarkshire Council as the local Roads Authority to:- 
(i) provide a standard of service on public roads which will permit safe
movement of vehicular and pedestrian traffic appropriate to the
prevailing weather conditions; 
(ii)  establish a pattern of working which will keep delays, diversions or road
closures to a minimum during adverse weather conditions; 
(iii)  conduct operations having regard to the requirements of the Health and
Safety at Work Act, 1974. 
This winter service policy has been developed taking account of Well Managed Highway
Infrastructure A code of Practice (2018)’. 
This document is supplemented by a Winter Service Operational Plan developed in
conjunction with our Partner, Amey Public Services LLP (APS), and is reviewed annually. 
The provision of the service is supported by the Council’s Customer Services Hub. 
Page 301 of 366

Page 302

10  Page 302 of 366

Page 303

11 
2.  POLICY 
2.1 TREATMENT OF ROADS 
North Lanarkshire Council has the following priorities for treatment of carriageways and
footways/footpaths that has been formulated on a hierarchical basis: 
CARRIAGEWAY PRIORITIES
Primary Road
Network 
These roads
are treated on a
Precautionary
Salting basis
All ‘A’, ‘B’ and some ‘C’ classified roads, main distributor roads; main
roads in the vicinity of schools; access roads to hospitals, ambulance
depots, main police stations and fire stations, and main bus routes.
Other main roads steeper than 1 in 10 gradient (10%) and roads that
are of local or national importance for the delivery of essential services.
Where severe weather conditions are predicted these roads will be pre-
salted and this will normally be carried out before the morning peak.
Depending on weather conditions this could also involve an evening
pre-salt. Where severe conditions such as snow persist, resources will
remain concentrated on these roads.
Secondary
Road Network  
These are
treated on a
Post Salting
basis, except as
described for
schools. 
Secondary distributor roads; access to isolated villages and rural
communities; a main access road to each school; rural through routes
not included above; spine roads into residential and industrial areas.
Residential areas with road gradients steeper than 1 in 12.5 (8%),
where the length of gradient exceeds 100m and where specific
difficulties have been identified and where it is practical to do so. 
Secondary roads will be post treated when road surface temperatures
are forecast to stay below zero for a significant period beyond 12
noon, following the precautionary treatment of the primary road
network. 
Where road surface temperatures are forecast to stay below zero for
a significant period beyond 12 noon and when resources are
available secondary routes will be pre-treated to improve travel to
school.
Other Roads
These are
treated on a
Post Salting
basis. 
On the satisfactory completion of post salting of the abovementioned
roads and if severe weather conditions persist, the remaining road
network will be treated on a reactive basis. Treatment will be
dependent on resources and changing weather conditions. 
Depending on weather conditions, treatment of the remaining network
may take several days from onset of severe weather as priority will be
given to, and concentrated on, the above stated road hierarchy. 
Post salting will only be undertaken if severe weather conditions are
likely to extend for a significant period beyond 12 noon. Post salting
operations will normally be undertaken out with the morning peak. 
During a period of prolonged severe weather conditions forecast to last
longer than 7 days, blue light enquiries will be prioritised, and priorities
will also take into account funerals, weddings, births and anyone
requiring immediate hospital treatment (the council will coordinate this
element of operations with NHS Lanarkshire).  Reactive squads will
Page 303 of 366

Page 304

12 
FOOTWAY, FOOTPATH AND CYCLE ROUTE PRIORITIES 
Primary Path
Network -
Treated on a
Precautionary
Salting basis 
Urban Shopping areas, precincts and main pedestrian routes remote
from carriageways which link major residential /commercial / industrial
/ educational facilities. 
Secondary Path
Network –
Treated on a
Post
Salting basis. 
Footways and Footpaths not covered above and Cycle Routes 
The treatment of primary path network will normally be carried out before the morning
peak. The Secondary path network and other paved areas shall only be considered for
treatment in times of persistent ice or snow.   
also prioritise special education needs schools, cemeteries, council
sheltered housing and ice on ponds. 
In some cases, roads may remain untreated until weather conditions
ease.
Snow Clearing
Operations 
Following the onset of heavy snowfalls the maximum available fleet of
ploughing vehicles will be utilised. These operations will continue whilst
snow is still falling with resources targeted to keep arterial routes open.
After snow has stopped falling but is still lying, routes will be treated in
line with salting priorities as resources permit. During prolonged events
forecast to last more than 7 days additional resources supplied by Land
Management or other resources will be deployed. 
Patrolling When marginal forecasts predict temperatures approaching but not
expected to dip below zero degrees and when forecasters are low in
confidence about their predictions, patrolling takes place.  This
operation is principally to check what the actual road conditions are
on the network. A representative sample of the network will be
patrolled to identify if a full pre-cautionary salt is necessary.
Page 304 of 366

Page 305

13 
2.2 SALT STOCK LEVELS 
In extreme conditions salt stock levels can fall significantly in a very short period. In
certain rare and unusual circumstances normal re-stocking of salt has in the past been
prevented by external forces out with the control of the Council and its partners. If such
an occurrence is repeated in the future, to conserve limited salt stocks, the winter
service provision will be dedicated to the treatment of the primary networks only. 
APS have covered storage areas that hold a maximum of 10,000 tonnes of salt. The
salt held in stock is monitored on a weekly basis to ensure that the average stock level
of 7,500 tonnes is maintained during the high season. This average stock level is
reduced to 4,500 tonnes at the end of February. 
The Council also has a covered strategic salt stock of 10,000 tonnes to enhance
corporate resilience for the delivery of all services during periods of prolonged severe
winter weather.  
2.3      LEVEL OF SERVICE 
The decision to initiate winter service operations will normally be based upon the
forecast received from the council’s weather service provider during the winter period. 
These forecasts will be provided every day at 0600hrs, 1200hrs and 1800hrs (including
weekends and public holidays) to staff providing the winter service. In addition, the
weather service provider will contact the Council’s partner, APS if there is any major
change in the projected weather conditions. 
Winter service operations will also be initiated by APS on confirmed reports of adverse
weather conditions. 
As the decision to initiate winter service operations will normally be based on the
weather service forecast, it is proposed where possible to treat primary roads out with
the hours of peak traffic flows. Therefore, it is intended that the treatment of all primary
roads will be completed prior to the morning peak (0730 hrs).  Where forecasts indicate
adverse conditions in the evening, all reasonable effort will be made to treat primary
roads out with the evening peak, but this will not always be practicable. 
Primary Path Network salting operations will be generally undertaken between the
hours of 0500 hrs and 0800 hrs. Following prolonged periods of cold dry weather salting
may not be undertaken if it is considered that sufficient residual salt is present. If severe
weather is forecast in the evening, treatment of footpaths will be undertaken during
daylight hours where there is no residual salt present and heavy precipitation is not
forecast. 
Carriageway treatment will normally be undertaken within the following timescales. 
• Primary Road Network – completed within 3.5 hours of commencement of
treatment. 
• Secondary Road Network – completed within 3.5 hours of the completion of
Primary roads network, subject to weather conditions and the need to repeat
treatment on the primary road network. 
• Other Roads – these are dependent on weather conditions and resource
availability and may be measured in timescales of several days from onset of
severe weather.
Page 305 of 366

Page 306

14 
In recent years several attacks on the winter fleet have been perpetrated by individuals
throwing missiles. This has caused damaged to vehicles and had the potential to
seriously injure winter service operatives. Where such instances occur, the service will
be withdrawn / restricted until a risk assessment considers it is safe to reinstate the
normal level of service.  
3. PROCEDURES 
3.1 PREPARATION OF ROUTES 
Prior to the commencement of the winter service period, the council’s roads winter
service contractor will prepare a list of priority routes based on the carriageway,
footway, footpath and cycle path priorities shown in section 2. However, to minimise
unproductive mileage some roads in a lower category may be treated out of sequence. 
A full set of priority routes will be kept by the Chief Officer (Community Operations). 
The winter service provider will also have a full set of routes. 
Any alterations to the carriageway, footway and footpath priorities will be notified in
writing to the roads winter service contractor who will make the necessary adjustments
to the routes. 
3.2 METEOROLOGICAL REPORTS 
Arrangements shall be made by the Chief Officer (Community Operations), through the
West of Scotland Weather Consortium, for the weather forecast to be provided for the
North Lanarkshire Area from early October to the middle of May each year. 
The weather service provider will provide the Council and it’s roads winter service
contractor with the forecast each day at 0600hrs, 1200hrs and 1800hrs and any other
weather warnings out with these times throughout the winter service period. 
The Council will ensure that weather service provider is provided with the telephone
numbers of the members of staff responsible, on a rota basis, for initiating action out
with normal working hours. 
The roads winter service contractor and the Council’s staff have the facility at any time
to contact the weather service provider’s duty forecaster to discuss/clarify the forecast. 
All staff involved in decision making for the delivering of the Winter Service shall be
trained in the interpretation and comprehension of climatic, temperature and weather
conditions and forecasts.  
Page 306 of 366

Page 307

15 
3.3 DECISION MAKING PROCESS 
The topography of North Lanarkshire is such that three distinct geographical areas of
potential climatic variation have been identified. The weather forecast provides
information for these geographical areas to reflect different climatic conditions. These
forecasts will be used by the council’s roads winter service contractor to determine and
plan the scope of work necessary and to minimise unnecessary treatment and action. 
The winter service period is split into a High and a Low Period. During the High Period,
mid-October to mid-April, the council’s roads winter service contractor has resources
on standby to react to prevailing weather forecast. During the Low Period, between
early October and mid-October and mid-April to mid-May the council’s roads winter
service contractor may not be on standby and therefore reaction times may be greater.
These periods can be altered as required to reflect longer term weather forecast.   
When the staff member of the council’s roads winter service contractor receives the
weather forecast at 1100 hours they shall make a decision on whether or not action is
required. All proposed actions will be acknowledged by the Client standby officer.
Further, the Client reserves the right to amend the proposed action if deemed
necessary. The Client standby officer will approve all actions. The Council has access
to 5no. weather stations to assist the decision-making process. 
When updates to the forecast are received out with normal working hours the staff
member on standby for the council’s roads winter service contractor shall take
appropriate action based on the update. If there is a significant change to the weather
forecast and / or proposed actions the appropriate Client staff will be informed. 
During periods of low temperature, if there is uncertainty about the course of action
required by the update, consultation will take place with trained members of staff and
/or the duty forecaster from the weather service provider. 
The provision of an internet Weather Consortium Message Board for posting of
decisions taken by North Lanarkshire Council and by adjacent Authorities will allow
continuity of service to be monitored and action taken where it is considered
appropriate. North Lanarkshire Council actions will be posted together with updates to
proposed actions. 
Decisions taken regarding North Lanarkshire routes will be recorded on the Winter
Service electronic management system. 
. 
Page 307 of 366

Page 308

16 
3.4 RESOURCES 
(a)  Salt 
Under the Road Street Lighting and Winter Services contract, it is the responsibility
of the council’s roads winter service contractor to organise the provision of salt to
each depot and ensure the levels of salt do not fall below the prescribed minimum
levels.   
At main recycling centres within the Council Area, a single quantity of 20kg or less
of sand salt mix will be available for issue free of charge to the public, subject to
them supplying a suitable container. 
(b) Personnel 
The council’s roads winter service contractor will provide a stand-by rota of
supervisors and manual operators for the winter service period. Standby will
commence in mid-October and continue until the middle of April. However, this
period may commence earlier or finish later should conditions warrant. 
During moderate winter weather it is envisaged that resources from the council’s
roads winter service contractor will be able to provide the level of service described
in section 2.2. In extreme conditions, however, additional labour may be required
from other sources, including other services of the Council. 
(c) Plant 
During the summer period, all equipment for salting roads and clearing snow will
be maintained to ensure it is in working order prior to the start of the winter service
period and where appropriate ensure that ancillary items can be fitted to vehicles
without difficulty. 
The council’s roads winter service contractor will provide a communications
system between the depot and all the winter service fleet. 
The winter fleet is fitted with data logging and a Geographic Positioning System
(GPS). 
3.5 ROAD CONDITION REPORTS 
Each working day throughout the winter service period, a daily report of the operations
that have taken place during the previous 24 hours will be available on the electronic
manager system.  The report shall provide information on routes treated, salt used,
time operations started, roads closed, additional resources used and details of any
other major problem. 
The report is available to the Chief Officer (Community Operations) and the Roads
Teams, any major incident will be reported immediately to Client staff. 
Page 308 of 366

Page 309

17 
3.6 LIAISON WITH POLICE 
In recognition of the role of the Police during difficult weather conditions, the council’s
roads winter service contractor shall advise the Police of all adverse forecasts relating
to winter operations. The council’s roads winter service contractor shall also request
appropriate assistance from the Police when moving equipment, arranging road
closures, and dealing with abandoned vehicles.   
Where appropriate, the council’s roads winter service contractor shall advise the Police
at the Force Control Room of all extreme adverse road conditions, including roads
closed or conditions which may lead to roads being closed. The Police may report such
matters to the broadcasting authorities. Such communications will be followed up by
reports on progress and clearance, particularly when conditions are returning to
normal. On request to their Group Traffic Superintendent, the Police have agreed to
assist the movement of ploughs and salting vehicles on principal traffic routes. 
The councils roads winter service contractor shall issue out of hours rotas (including
amendments) to the Chief Constable, Divisional Commander's Office and local Police
Offices. 
Reports from the Police regarding dangerous road conditions shall be acted upon by
the council’s roads winter service contractor’s designated staff on stand-by as soon as
practicable, having regard to priorities in this document and the conditions pertaining
throughout the Council's area. 
3.7 WARNING SIGNS 
The Chief Officer (Community Operations) shall at appropriate locations arrange for
the erection of signs giving warning of sections of road liable to icing. 
3.8 ROAD CLOSURES 
Where a road is closed, the council’s roads winter service contractor is responsible for
ensuring that the Police and Council staff are advised and that appropriate signs are
erected.  When the road continues into an adjoining Council area that Council shall be
kept informed. 
3.9 SALT BINS 
Salt bins will be provided in the vicinity of all school.  They may also be provided at
specific locations to assist the local community in areas not on priority routes or at
known trouble spots including steep gradients and sharp bends.  Bins will only be
provided at those locations that meet the minimum scoring criteria set out in appendix
D and where agreement can be reached with the adjacent property owner/ occupier. 
It is intended that these salt bins are for the self-use of the public as an enhancement
to the service provided by the Council. Records of existing salt bin locations are held
by the Chief Officer (Community Operations) and detailed on the Council’s winter
service webpage. 
Page 309 of 366

Page 310

18 
3.10 COMMUNITY SALT PILES 
Community Salt Piles will be provided at the following locations, establish for the
winter of 2021/22.
• Coatbridge - Time Capsule Coatbridge
• Airdrie – Airdrie leisure Centre
• Bellshill – Matt Busby Centre
• Motherwell – aquatec
• Wishaw – sports centre
• Kilsyth – sports centre
• Cumbernauld – Broadwood stadium
• Shotts – sports centre
• Northern Corridor – Ian Nicholson Centre
• Salsburgh  - Community Centre
• Viewpark – Car park at Burnhead CC
• Croy – area at hub
• Newmains – NCT Centre
• Moodiesburn – Pivot Centre 
3.11 KEEPING AND RETENTION OF RECORDS 
Appropriate records will be kept of the following by the council’s roads winter service
contractor :- 
(a)   The weather forecasts, including updates. 
(b)   Decisions taken based on the weather forecasts. 
(c)   Decisions taken based on other reports. e.g. police reports. 
(d)   Maximum and minimum air temperatures at each depot. 
(e)   Details and timings of routes salted. 
The council’s roads winter service contractor will be responsible for preparing and
retaining the above records for a minimum period of 7 years. Records from the Council
weather stations are held by the service provider. 
Page 310 of 366

Page 311

19 
APPENDIX A 
PLAN OF NORTH LANARKSHIRE AND WEATHER DOMAINS 
Page 311 of 366

Page 312

20 
APPENDIX B – CONTACT INFORMATION 
It should be noted that the service cannot react to individual requests for streets to be treated/
cleared therefore individual requests are no longer logged.  
All enquiries relating to the filling of and request of new salt bins should be directed to the
following 
New salt bin - Grit bin: request a new grit bin | North Lanarkshire Council 
Refill a salt bin - Grit bin: request refill | North Lanarkshire Council 
Website: www.northlanarkshire.gov.uk 
In the event of an emergency Police Scotland should be the first point of contact. 
APPENDIX C – DISTRIBUTION LIST 
Internal :- 
North Lanarkshire Local Elected Members
Chief Executive
Depute Chief Executive
Chief Officer (Legal and Democratic) 
External :- 
Trunk Road Operators 
Amey Public Services LLP
Automobile Association (AA)
Chief Executives of Adjacent Councils :-
(East Dunbartonshire, South Lanarkshire, City of Glasgow, West Lothian, Falkirk, Stirling)
Community Councils
Grid Controller, Scottish Gas
Road Haulage Association
Royal Automobile Club (RAC)
Scottish Ambulance Service
Scottish Government
Scottish Fire & Rescue Service – Service Delivery Director - West
Scottish Fire & Rescue Service – Chief Officer
Strathclyde Partnership for Transport
(Local Bus Companies distributed via SPT)
Police Scotland - Divisional Commanders
Scottish Road Partnership Project Ltd 
Page 312 of 366

Page 313

21 
APPENDIX D – SALT BIN DECISION MATRIX 
Road name and number 
Is there a grit bin within 300m of the location* If yes do not proceed with assessment
Would this bin be placed on a public road If not do not proceed with assessment
Is there a suitable hardstanding location for a
salt bin
If not do not proceed with assessment
Is there agreement from the adjacent property
owner/ occupier
If not do not proceed with assessment 
Characteristic Severity Standards
Score
Assessed
Score
Gradient Gradient (>1 in 20)
Gradient (<1 in 20)
20
0
Bend Bend (> 90 degrees)
Bend (< 90 degrees)
10
0
Close proximity to and falling
towards 
A or B class Roads
Unclassified/ residential roads
10
0
On a treated route Primary carriageway  -10 
Vertical traffic calming
measures
Yes
No
10
0
Any special features
(Hospital, doctors surgery)
Yes
No
20
0
Total of 20 or
above qualifies 
*The 300m distance would be the walking distance using the existing footways/ footpaths,
shared surface, and shared spaces. 
Page 313 of 366

Page 314

Appendix 2 
North Lanarkshire Council
Report
Member/ Officer Working Group 
Does this report require to be approved? ☒ Yes   ☐ No
Ref     Date 20/06/23 
Salt bins and community resilience 
From  John Ashcroft (Roads and Land Maintenance Manager)  
E-mail ashcroftj@northlan.gov.uk Telephone 01236 632584 
1. Background 
1.1 At the meeting of former Environment and Place Committee on the 24 August 2022 a
report was submitted for approval containing the council’s annual Winter Service Policy
and Procedures 2022/23.
Executive Summary 
The purpose of this report is to provide an overview of the member/officer working group
discussion that have taken place.  Agree the actions to be taken forward following the
discussion. 
Recommendations
It is recommended that the group. 
(1) Acknowledges the position around providing additional information for the
treatment of schools.
(2) Agrees the proposed decision matrix for inclusion in the Winter Service Policy and
Procedures 2023/24 and the application of the criteria for outstanding requests
from 2022/23.
(3) Agrees that robust data is gathered over the next winter period regarding grit bin
use.  This is reported as part of the approval for the Winter Service Policy and
Procedures 2024/25, including options for rationalisation.
(4) Housing Services and the Community Partnership Team continue to liaise with
community groups to encourage the use of local grit bins and grow community
resilience. 
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (17) Ensure we keep our environment clean, safe, and attractive
Page 314 of 366

Page 315

1.2 Within the report paragraphs 2.13 to 2.16 discussed the existing number of grit bins
provided across North Lanarkshire and proposed that all bins were assessed against
Appendix D of the Winter Service Policy and Procedures and thereafter a rationalisation
proposal would be considered as part of the council’s annual budget processes and
implemented during the summer of 2023. 
1.3 The purpose of the rationalisation was to ensure that salt bins were provided at the
most challenging locations, and they can be effectively serviced during periods of
adverse weather. 
1.4 At the meeting an amendment was moved with the significant challenge of servicing
the bins being acknowledged and recommendations of undertaking an analysis to
identify high priority bins.  Establish a working Group to evaluate and maximise both
Service and community resilience and report back to a later cycle of the committee. 
2. Working Group of 20 March 2023 
2.1 The first meeting of the working group took place on the 20 March 2023 and discussion
took place around the policy, legal context, salt bin provision, community resilience,
budget/ finance, and available options.  Following the initial discussion, the following
was decided to help inform discussions at the next meeting. 
• that detail be provided to the Group on the quantity of salt used over the previous
years;
• that information be provided to the Group on the contract currently in place
regarding paths and roads managed by schools;
• that details be provided to the Group on Tenants Associations and Groups that
could be used as part of a communication strategy;
• that details be provided to the Group of those groups who have been provided with
a Winter Resilience Pack who could be a part of a Community Resilience strategy;
• that a 3-stage prioritisation decision matrix be developed;
• that the Community Board area with the largest number of grit bins to be used as a
pilot for a revised matrix/refilling strategy;
• that it be acknowledged that any proposals would be applicable for those bins which
are not re-filled as they have over 50% grit levels, and
• that officers investigate whether it could be established how many properties have
access to grit bins, e.g. 100m from a bin, 200m from a bin etc. 
Working Group of 05 June 2023 
2.2 The second meeting of the group took place on the 5 June 2023 and in response to the
decision above the following information was provided and discussed. 
Historic Salt Use for the last five years 
• 2018/19 15,148 tonnes
• 2019/20 16,047 tonnes
• 2020/21 26,476 tonnes
• 2021/22 12,995 tonnes
• 2022/23 14,902 tonnes 
Page 315 of 366

Page 316

Treatment of schools 
2.3 Treatment of schools is undertaken by Mitie as part of a separate arrangement out with
the council’s statutory responsibility for Roads.  In addition, the Facility Support Teams
are issued with guidance around Emergency Arrangements for Severe Weather. 
Tennant’s Association and Groups 
2.4 Details were provided of groups know to Housing Services and the Community
Partnership Team. It was clear that the groups are engaging with different parts of the
council for different services.  Discussion took place around engaging all groups in
terms of winter resilience and growing local resilience.  It was acknowledged that some
groups may have limitations due to lack of storage opportunities. 
Prioritisation Matrix 
2.5 At the previous meeting it was agreed to select the Community board area with the
greatest number of grit bins and use this to develop a prioritisation matrix for filling grit
bins. The current number of grit bins within each board area was as follows. 
• Airdrie – 526 Grit Bins
• Bellshill – 289 Grit Bins
• Coatbridge – 319 Grit Bins
• Cumbernauld – 555 Grit Bins
• Kilsyth – 155 Grit Bins
• Motherwell – 314 Grit Bins
• Northern Corridor – 216 Grit Bins
• Shotts – 152 Grit Bins     
• Wishaw – 247 Grit Bins 
2.6 Given that the grit bin numbers were similar for Airdrie and Cumbernauld, the exercise
was carried out for both Community Board areas.  This exercise identified those bins
that had less than 50% salt within them and were filled in September, January, both
September and January and those that did not require to be filled as part of this process
as they still had salt stocks greater than 50% at that time.  This exercise did not include
one off ad-hoc requests. 
2.7 The exercise showed a point in time, and it was acknowledged that this can change
from year to year and to create a prioritisation for each grit bin using this information
may not be representative of the true position.  Discussion took place around how the
information could be improved using technology to gather more robust information to
help inform future decisions. 
Property distance from grit bins 
2.8 It was agreed that a review would be undertaken to establish how many properties had
access to grit bins and the distance from each property within certain parameters e.g.
100m, 200m.  This task could not be completed due to system changes and lack of
data. 
Page 316 of 366

Page 317

Proposed Actions 
2.9 The group decided the following actions. 
• that the information regarding salting in and around schools be noted;
• that additional information would request from Corporate Property of the areas
within schools treated by them during periods of winter weather, and
• that Facilities Management would be contacted with a view to requesting that
the responsibility for salting footpaths adjacent to schools be embedded in the
job descriptions for school janitorial staff.
• that the position be noted regarding refilling of individual salt bins in two
Community Board areas;
• that options be explored for the inclusion into the new Enterprise Contract of a
requirement for the contractor to monitor and review salt usage over a set period
of time;
• that staff from the current contractor be provided with a digital tool to record data
on salt levels in grit bins with reporting thereafter on the data acquired to the
appropriate Committee;
• that a review be undertaken of the criteria to be applied to determine the “Priority
Level” for new bin requests, and
• that, at this time, no recommendations be made in relation to a change in policy
for the refilling or removal of grit bins. 
Considerations for Group 
2.10 Discussions have taken place with Corporate Property around additional information
relating to gritting within school grounds.  Providing additional information to local
elected members is currently being reviewed and options for provision digital mapping
similar to the road’s information is also being considered. 
2.11  The existing decision matrix has been reviewed and the proposed replacement for
the matrix within the Winter Service Policy and Procedures is shown in Appendix 1. 
It is proposed that this matrix is also applied to requests received for requests received
during the previous winter. Failure to assess requests against this criterion could
result in a further increase in provision within areas that already have adequate grit
bin provision. 
2. Supporting Documents 
Appendix 1 – Salt Bin Decision Matrix 
John Ashcroft
Roads and Land Maintenance Manager 
Page 317 of 366

Page 318

Appendix 1 
Appendix D - Salt Bin Decision Matrix 
Road name and number 
Is there a grit bin within 300m of the location If yes do not proceed with assessment
Would this bin be placed on a public road If not do not proceed with assessment
Is there a suitable hardstanding location for a
salt bin
If not do not proceed with assessment
Is there agreement from the adjacent property
owner/ occupier
If not do not proceed with assessment 
Characteristic Severity Standards
Score
Assessed
Score
Gradient Gradient (>1 in 20)
Gradient (<1 in 20)
20
0
Bend Bend (> 90 degrees)
Bend (< 90 degrees)
10
0
Close proximity to and falling
towards 
A or B class Roads
Unclassified/ residential roads
10
0
On a treated route Primary carriageway  -10 
Vertical traffic calming
measures
Yes
No
10
0
Any special features
(Hospital, doctors surgery)
Yes
No
20
0
Total of 20 or
above qualifies 
Page 318 of 366

Page 319

North Lanarkshire Council
Report
Environment and Climate Change Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    SL/JMcK/MK/LS Date 23/08/23 
Sustainable Futures - Local Heat and Energy Efficiency Strategy 
From  Stephen Llewellyn, Chief Officer, Housing Management
James McKinstry, Chief Officer, Assets and Procurement  
E-mail llewellyns@northlan.gov.uk
mckinstryj@northlan.gov.uk Telephone 01698 274192
07939 281102 
1. Background 
1.1 The Scottish Government’s Heat in Buildings Strategy (2021) sets out its aims and
objectives for achieving net zero emissions within the entire building stock in Scotland
by 2045, including addressing energy efficiency as a driver of fuel poverty. As part of
Executive Summary 
The purpose of this report is to advise committee of the progress made in producing a
Local Heat and Energy Efficiency Strategy (LHEES) for North Lanarkshire. 
The LHEES will set out the long-term plan for decarbonising heat in buildings and improving
their energy efficiency across the entire local authority area, with a key objective to
eliminate poor energy efficiency as a driver of fuel poverty. In October 2022, a statutory
order was passed by the Scottish Parliament that requires all local authorities to prepare
and publish an LHEES and accompanying delivery plan by 31 December 2023. 
Recommendations
It is recommended that the Environment and Climate Change Committee: 
(1) Recognise the requirement for a LHEES and accompanying delivery plan to be in
place by 31 December 2023.
(2) Appreciate the progress made to date in producing the LHEES.
(3) Acknowledge consultation will take place with key stakeholders over the
forthcoming months with publication of the draft LHEES planned for public
consultation in October 2023.
(4) Acknowledge approval for the LHEES and accompanying delivery plan will be
sought at Policy and Strategy Committee in December 2023.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Item 10
Page 319 of 366

Page 320

this Strategy, LHEES will set out the long-term plan for decarbonising heat in buildings
and improving energy efficiency across the entire local authority area. 
1.2 The purpose of LHEES is to provide ‘a framework for taking an area-based approach
to heat and energy efficiency planning and delivery’ and aims to: 
• set out how each segment of the building stock needs to change to meet national
objectives, including achieving zero greenhouse gas emissions in the building
sector, and the removal of poor energy efficiency as a driver of fuel poverty; 
• identify heat decarbonisation zones, and set out the primary measures for reducing
emissions within each zone, with a view to zones acting as a potential trigger for
regulation in the future if required; and 
• prioritise areas for delivery, against national and local priorities. 
1.3 The LHEES is driven by Scotland’s statutory targets for greenhouse gas emissions
reduction and fuel poverty: 
• Net zero emissions by 2045 and 75% reduction by 2030.
• In 2040, as far as reasonably possible, no household in Scotland is in fuel poverty. 
1.4 The methodology for developing a LHEES was issued to local authority contacts in
Autumn 2021, with the final guidance issued in October 2022. Under the Local Heat 
and Energy Efficiency Strategies (Scotland) Order 2022, the council has a legal 
obligation to prepare and publish an LHEES and a Local Heat and Energy Efficiency
Delivery Plan (LHEEDP) for North Lanarkshire by 31 December 2023. It must then be
updated every five years. 
1.5 The LHEES should be structured around the following six considerations: 
Heat decarbonisation
• Off-gas grid buildings – transitioning from heating oil and liquified petroleum gas
(LPG) in off-gas grid areas;
• On-gas grid buildings – on-gas grid heat decarbonisation;
• Heat networks – decarbonisation with heat networks;
Energy efficiency and other outcomes
• Poor building energy efficiency;
• Poor building energy efficiency as a driver of fuel poverty; and
• Mixed-tenure, mixed-use buildings, listed building and buildings in conservation
areas. 
1.6 The LHEES is evidence based, covering the full domestic and non-domestic building
stock within North Lanarkshire, as far as reasonably possible.  It is being developed in
collaboration with stakeholders, which include internal council stakeholders from key
services, as well as external stakeholders.  These include, but are not limited to, other
public sector bodies, such as NHS Lanarkshire and the Scottish Prison Service,
Registered Social Landlords,  Community Boards, VANL, delivery partners such as
Energy Saving Trust and Home Energy Scotland, utilities, heat network and waste
network providers, transport providers, land/environment agencies as well as the
general public.  The LHEES is a corporate document that should be agreed and
supported by all relevant council services.  
Page 320 of 366

Page 321

1.7 Spatial zoning is a key element in LHEES, it helps to support and differentiate
interventions required across areas of North Lanarkshire.  At a higher level Strategic
Zones are used to present a visualisation of the building stock across broader areas of
North Lanarkshire.  This is useful to understand the baseline performance and identify
considerations of focus within LHEES for follow on engagement.   
1.8 From Strategic Zones, Delivery Areas then look at a higher granularity to identify
specific clusters of buildings which have common challenges and can therefore benefit
from the same interventions.  The zoning will be used to guide the design of the policy
levers, such as advice, funding programmes and regulation to give further direction and
clarity to delivery routes and timescale.   
1.9 Under the Heat Networks (Scotland) Act 2021, local authorities are required to carry
out a review of potential areas for heat networks. The LHEES Methodology provides
an approach to help support local authorities to discharge this duty. The designation of
heat network zones however falls out with the scope of the LHEES. 
1.10  The LHEES Methodology comprises of 8 stages: 
• Stage 1: Policy and strategy review
• Stage 2: Data and tools library
• Stage 3: Strategy zoning and pathways
• Stage 4: Generation of initial Delivery Areas
• Stage 5: Building-level pathway assessment
• Stage 6: Finalisation of delivery areas
• Stage 7: LHEES Strategy
• Stage 8: LHEES Delivery Plan 
1.11 In 2019, the council, along with other local authorities, took part in the Scottish
Government’s LHEES phase 2 pilot project. The pilot tested and developed a method
for creating an LHEES, including identifying appropriate data sources, gaps, and the
resources and knowledge required to produce an LHEES. The project was led by the
Energy Team based within Assets and Procurement and was supported by colleagues
from other services, as well as Zero Waste Scotland and the Scottish Government.
Burohappold Engineering were commissioned by the council to assist in this pilot. 
Whilst a useful exercise the former LHEES methodology and guidance differs
significantly from the current version. 
2. Report 
2.1  To help local authorities develop and deliver the LHEES, the Scottish Government has
committed to a total funding package of £375,000 for North Lanarkshire over five years.
This will be delivered in annual payments of £75,000 from 2022/23 to 2027/28. 
2.2  Given the highly complex technical aspects and resource intensive nature of
developing the LHEES, as well as the challenging timescales, it was agreed that the
council would appoint a consultant to assist in the production of the LHEES. 
2.3 Ricardo Energy and Environment were successfully awarded the contract for
production of the LHEES and LHEEDP in April 2023. Prior to the appointment of
Ricardo, the council undertook a full policy and strategy review in line with Stages 1 &
Page 321 of 366

Page 322

2 of the LHEES Methodology. This will be further refined and updated on an iterative
basis as the project progresses, to ensure alignment with any changes in national or
local policy. Stages 3 to 8, alongside the necessary required impact assessments will
be undertaken by Ricardo, with support from the council as required. Appointment of
Ricardo is being funded using the first year of Scottish Government funding. 
2.4 A cross-service LHEES Project Team has been established to progress development
of the LHEES. The Project Team meet on a regular basis to monitor progress and
provide support to Ricardo. Overall governance for progression of the LHEES lies with
the LHEES Board, who meet on a six-weekly basis.  The LHEES Board comprises the
five Chief Officers within Enterprise and Communities, with senior reporting officers
Chief Officer, Housing Management and Chief Officer, Asset and Procurement
Solutions, alongside two project managers, who lead on the day-to-day progression of
the LHEES. 
2.5 Though timescales remain challenging, the LHEES project is currently on track to meet
the 31 December 2023 deadline. Stages 3 & 4 of the LHEES Methodology are now
complete and initial findings have been presented to the LHEES Board for
consideration. Findings include recommendations on the definition of strategic zones
(including those that should be the focus for Delivery Areas), the identification of
potential heat network zones, pathways for decarbonisation for each zone and an
overall summary of the opportunities and challenges for heat decarbonisation in North
Lanarkshire. 
2.6  It is anticipated that the final draft LHEES and LHEEDP will be available for public
consultation in October 2023. The final LHEES and LHEEDP will then be presented to
Policy and Strategy Committee for consideration and approval on 7 December 2023.
Full details of timescales are detailed in the Project Plan (attached as an Appendix to
this report). 
2.7  Although the LHEES and LHEEDP do not require to be formally submitted to the
Scottish Government, the Scottish Government have announced their commitment to
funding a review of local authorities’ draft LHEES.  The review is intended to act as a
critical friend for local authorities, providing feedback to ensure requirements are met
as set out in the LHEES Guidance.  Although participation in this is optional, the council
have indicated their intention to participate and it is expected this will coincide with the
public consultation in October 2023. 
2.8  Following production of the LHEES there will be an ongoing requirement for a resource
to co-ordinate and monitor progression of the LHEES actions. It is envisaged that
following the initial development and publication phase, there will be a need for a
dedicated post to carry out this role. The Board are actively considering this and intend
to take a view on this following finalisation of the first iteration of the LHEES and
feedback received from participation in the Scottish Government review of LHEES. 
This will provide an indication of any further development of the LHEES required which
may entail resource from the Scottish Government annual LHEES funding allocation. 
3. Measures of success 
3.1 Production and publication of a Local Heat and Energy Efficiency Strategy and Local
Heat and Energy Efficiency Delivery Plan by 31 December 2023. 
Page 322 of 366

Page 323

4. Supporting documentation 
Appendix – Local Heat and Energy Efficiency Strategy Project Plan. 
Stephen Llewellyn               James McKinstry
Chief Officer (Housing Management)        Chief Officer (Assets and Procurement) 
Page 323 of 366

Page 324

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
An equality impact assessment is underway and will be published with the final
LHEES and LHEEDP. 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
Scottish Government have committed to a funding package of £75,000 per annum
over the 2022/23 – 2027/28 period to aid development and delivery of the LHEES. 
Although there are no financial impacts currently there may be future financial
impacts arising from the implementation of the LHEES and associated LHEEDP.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
There is a statutory order in place for local authorities to produce an LHEES and
accompanying delivery plan by 31 December 2023.  
Page 324 of 366

Page 325

5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The LHEES provides the plan for decarbonisation of building stock in North
Lanarkshire.  The implementation of LHEES will have a significant impact on
reducing carbon emissions in North Lanarkshire.
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
The main risk at this stage is failure to meet the statutory order timescale of
publication of the LHEES by 31 December 2023.  This risk is actively managed and
recorded on  the project risk register. 
Page 325 of 366

Page 326

5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
This report in itself does not contain any information which has an impact on
children and young people.  However, a CRWIA is being undertaken for the
LHEES as it progresses to identify any potential impact and actions required, as
set out in the LHEES Guidance. 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 326 of 366

Page 327

Appendix – Local Heat and Energy Efficiency Strategy Project Plan
LOCAL HEAT AND ENERGY EFFICIENCY STRATEGY PROGRAMME
Project week number 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Activities (wk commencing)
24-Apr
01-May
08-May
15-May
22-May
29-May
05-Jun
12-Jun
19-Jun
26-Jun
03-Jul
10-Jul
17-Jul
24-Jul
31-Jul
07-Aug
14-Aug
21-Aug
28-Aug
04-Sep
11-Sep
18-Sep
25-Sep
02-Oct
09-Oct
16-Oct
23-Oct
30-Oct
06-Nov
13-Nov
20-Nov
27-Nov
04-Dec
Initial introductory meeting
Project start-up meeting
Data request
Project progress meetings
Stage 1 and 2 update
Stage 3 - Strategic zoning
Stage 4 - Generation of initial delivery areas
Stakeholder engagement led by council
Stage 5 - Building level pathway assessment
Stage 6 - Finalisation of delivery areas
Stakeholder engagement led by council
Contingency
Stage 7 - Production of initial draft LHEES (inc. live updates throughout project duration)
Stage 8 - Production of initial draft LHEEDP (inc. live updates throughout project duration)
Council review of draft LHEES/LHEEDP
Final draft LHEES/LHEEDP
Public consultation
Update following consultation
Impact Assessments
Final LHEES/LHEEDP
Head of service deadline
Conveners
Policy and Strategy Committee
NL School holidays
Page 327 of 366

Page 328

Page 328 of 366

Page 329

North Lanarkshire Council
Report
Environment & Climate Change Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    JA/AM Date 23/08/23 
Annual report on the performance of North Lanarkshire Council
from the Scottish Roadworks Commissioner and Transport
(Scotland) Act 2019 update. 
From  Andrew McPherson, Chief Officer (Community Operations)  
E-mail mcphersona@northlan.gov.uk Telephone 07939 280467 
Executive Summary 
The Scottish Road Works Commissioner oversees improvements to the planning,
coordination, and quality of road works by both local authorities and statutory undertakers
in Scotland. The Council has a Duty under section 118(1) of the New Roads and Street
Works Act 1991, to co-ordinate the execution of works of all kinds in roads for which they
are responsible. This report presents Elected Members with details of the Scottish Road
Works Commissioner’s Performance Review in relation to Road Works undertaken by
North Lanarkshire Council during 2022/23. 
The Transport (Scotland) Act 2019 introduced new legislative reform measures to further
improve the regulation of road works in Scotland. These new measures are now being
implemented following delays, mainly due to Covid. 
Recommendations
It is recommended that the Environment and Climate Change Committee: 
(1) Acknowledge the Service’s operational performance between 1 April 2022 and 31
March 2023 as outlined within the Scottish Road Works Commissioner’s Annual
Report and;
(2) Recognise the potential resource implications due to the ongoing implementation
of the Transport (Scotland) Act 2019
(3) Acknowledge the arrangements for securing an improved level of performance from
all utility companies. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (17) Ensure we keep our environment clean, safe, and attractive
Item 11
Page 329 of 366

Page 330

1. Background 
1.1 The Scottish Road Works Commissioner is an independent public official established
under section 16 of the Transport (Scotland) Act 2005 and is accountable to the
Scottish Ministers and ultimately the Scottish Parliament. The Commissioner's aim is
to improve the planning, coordination, and quality of road works throughout Scotland. 
1.2 This Report updates the Committee on the performance of North Lanarkshire’s Roads
Service following the publication of the annual performance report by the Scottish Road
Works Commissioner for 2022/23. 
1.3 The Scottish Parliament voted to pass the Transport (Scotland) Bill on Thursday 10
October 2019. The Bill received royal assent on 15 November 2019 and became the
Transport (Scotland) Act 2019. The Act consists of 10 Parts and introduces new
measures across a range of transport related disciplines. The current and future
implications of Part 9 (Road Works) are outlined within this Report. 
2. Report 
2.1 The Commissioner monitors performance, promotes and encourages good practice
across both utility companies and roads authorities. The Commissioner also has
powers to impose financial penalties on roads authorities who systematically fail in their
duty to co-ordinate and upon statutory undertakers who systematically fail to co-operate
when undertaking road works. 
2.2 Responsibility for the day-to-day management and co-ordination of works undertaken
on roads is as follows: 
• North Lanarkshire Council, as the roads authority, has a duty to co-ordinate all road
works carried out on any road for which they are responsible;
• The reinstatement of road surfaces remains the responsibility of the party
undertaking the works. The roads authority has powers to inspect road works to
ensure that statutory undertakers (typically utility companies) fulfil their obligations;
• Traffic management at road works (cones, signs and barriers) is the responsibility
of the party undertaking the works; and
• The roads authority is responsible for any decisions related to the repair and
maintenance of their roads. 
2.3 All works undertaken within the Public Road in Scotland require to be noticed in
accordance with the conditions and timescales as set out in the New Roads and Street
Works Act 1991 and associated Codes of Practice. All works must be recorded on the
Scottish Road Works Register (Aurora). Any proposed works entered onto the Aurora
system without the requisite information, or out-with the prescribed timescales (both
prior to and after the works are undertaken) will incur a ‘noticing failure’. 
2.4 The Office of the Scottish Roadworks Commissioner issues annual performance review
letters to all works promoters in Scotland. Any organisation that fails to meet the
identified performance figures may be required to meet with representatives from the
Commissioner’s office to discuss the figures in greater detail. 
Page 330 of 366

Page 331

2.5  The aim is to balance the statutory rights of road works authorities and undertakers to
carry out works, with the expectation of road users that disruption from works shall be
kept to a minimum. 
2.6 The Commissioner has the Power to issue a Penalty of up to £100,000 to organisations
who persistently fail to comply with the requirements of the Act and / or secondary
legislation. 
2.7 As a result of the Covid-19 pandemic, most road operations and utility works were
suspended in the early part of 2020. The Service has recently been receiving an
increase in the number of requests for work, resulting in higher competition for road-
space. 
2.8 The telecommunications sector has seen a significant increase in installation of new
services. This includes the replacement of copper cables with fibre optic services and
within North Lanarkshire, the roll out of the digital infrastructure transformation project. 
2.9 Performance levels in recent years have generally been to a high standard. In 2019/20
the Report stated that in relation to works planning and operational functions, ‘North
Lanarkshire’s performance sets an example to other roads authorities.’ 
2.10 The Commissioners 2020/21 report took cognisance of the disruption across the
industry caused by the onset of Covid-19. North Lanarkshire’s general performance
was recorded as ‘satisfactory with a requirement to deliver greater consistency and
focus. 
2.11  It was noted that there was an administrative failure in following the Commissioner’s
guidance to undertake ‘emergency works only’ at the onset of the pandemic. While the
Council complied with the spirit of this guidance and focused on the wellbeing of our
staff, the Service failed to update a descriptive field in the notices for around 50% of
the emergency works that were undertaken. This has subsequently been addressed. 
2.12 Performance in 2021/22 was recorded as ‘well managed’ with no improvement action
identified. 
2.13 The full report for 2022/23 is available in Appendix 1 with performance summarised as: 
‘Overall, the road works performance of North Lanarkshire Council was well-managed
during 2022/23. This continues the good management from the 2021/22 reporting year
and I acknowledge your continuing commitment.’ 
2.14 One minor improvement action was highlighted in relation to the consistency of
submission of quarterly updates to the National Street Gazetteer. This is required to
ensure that the most current and accurate information is available to stakeholders using
the Scottish Road Works Register. This will be addressed going forward. 
2.15  In depth analysis of the Council’s performance is detailed in Appendix 2 and includes 
the following key indicators:- 
• Noticing failures; 
• Works stated and completed;
Recent North Lanarkshire Council Performance
Page 331 of 366

Page 332

• Overrunning Works;
• Fixed Penalty Notices issued to Statutory Undertakers;
• Sample inspections undertaken on Statutory Undertakers works. 
2.16  The Commissioner introduced further minor changes to the defect noticing regime on
1 April 2023, aimed at enabling more effective monitoring and governance of remedial
works on reinstatements and apparatus. Internal training has been undertaken to
enable compliance.   
2.17 The Transport (Scotland) Act 2019 was designed to help make Scotland’s transport
network cleaner, smarter and more accessible than ever before - aiming to empower
local authorities and establish consistent standards to tackle current and future
challenges, while delivering a more responsive and sustainable transport system for
everyone in Scotland. The Act consists of 10 Parts although only Part 9 (Road Works)
is considered within this Report. 
2.18 The Act amends the 2005 Transport (Scotland) Act and strengthens the status of the
Scottish Road Works Commissioner. The Commissioner now has powers of direction
through compliance notices, power to issue increased fixed penalty notices (£100,000,
previously £50,000), an inspection function and new inspection powers.  The provisions
also cover signing, lighting and guarding at road works sites, safety measures, the
qualifications of roads authority workers, reinstatement quality plans, information about
apparatus and commencement and completion notices. 
2.19 Significant changes included the mandatory requirement for Roads Authorities to fully
comply with the Code of Practice for Safety at Street Works and Road Works and a
mandatory requirement that roads authorities’ supervisors and officers have relevant
qualifications. 
2.20 The Service completed a training review in 2021/22 to identify gaps associated with the
new provisions, with training subsequently organised and completed to ensure
compliance. 
2.21 The Transport Act also gives the Scottish Road Works Commissioner powers to inspect
Road Authority works and associated documentation. The Council will continue to
prepare, undertake and notice road works to a high standard to reduce the risk of
potential fines and issue of compliance notices. 
2.22 The restructure of Roads & Lands Maintenance in 2021 incorporated the resources
required to ensure the Service continues to comply with the requirements of both the
New Roads & Street Works Act and Office of the Scottish Road Works Commissioner. 
2.23  On the 01 April 2023, recording of start/ stop notices became more onerous and
these are now required to be completed within both 2 hours of the work starting and
being completed. This seeks to improve the provision of more accurate information to
all road users going forward and has required changes in working practices for both
the Roads Service and Amey Public Services to ensure compliance. 
Transport (Scotland) Act 2019 – Road Works
Page 332 of 366

Page 333

2.24 Schedule 6B of the New Roads & Street Works Act, as amended by the Transport
(Scotland) Act 2005 enables Roads Authorities to issue Fixed Penalty Notices, for a
specific range of offences. This includes fines to utility companies who fail to notice
works in accordance with legislative requirements. The objective of this is to improve
the quality and timeliness of utility companies' notices, and ultimately the coordination
of roadworks. 
The Council’s Role in Public Utility Works 
2.25 The Council endeavours to balance the needs of the utility companies, supporting them
to complete the works in the shortest practical time, against the overall needs of those
who live, work, visit and travel in the area. 
2.26 Statutory Inspections are a method by which a Roads Authority can regularly establish
the performance of utility companies and involves inspection of a random sample of
sites at various stages during the works and the guarantee period following completion. 
2.27  There are three key stages related to these inspections and 10% of each utility’s
works are inspected at each stage: 
• Cat A - while it is being carried out (live sites); 
• Cat B - once a reinstatement is complete; and 
• Cat C - up to the end of their guarantee period. The guarantee period currently
lasts for a period of two years. This will be increased to six years for most
reinstatements from 1 October 2023 and will require changes to the Cat C
inspection process going forward. 
2.28  Typically, inspections of utility providers work will consider, but are not limited to, the
following: 
• Safe and proper traffic management used; 
• Ramps and correct information signs used; 
• Correct materials used; 
• Surface profile and condition; 
• Compaction of materials; 
• Sealing of joints, joints that have begun opening up; and
• All markings been replaced. 
2.29 Fees are payable to road works authorities for each sample inspection undertaken, as
prescribed by regulations. The current fee is set by the Scottish Government at £36 per
inspection. 
2.30 The number of sample inspections undertaken is based on the average number of
works by each utility during the previous three years. In 2022/23, the total number of
Sample Inspections carried out was 1,341. The breakdown of inspections on the major
utility company sites carried out is shown in Table 1 below. The average pass rate for
Page 333 of 366

Page 334

sample inspections for all public utility reinstatements was 97.3%. The Commissioner’s
target pass rate for each utility is 90%.   
Table 1 – Performance of Major Statutory Undertaker 
2.31 An additional process of defect inspections is carried out on reinstatements where
failures are found until remedial works are undertaken. This is supplemented by
additional target inspections on those utilities where performance is deemed not to be
acceptable. 
2.32 The Council issue FPN’s whenever there is a clear breach of noticing requirements in
line with the Code of Practice. Each Fixed Penalty Notice is for £120, discounted to £80
if payment is made within 29 days. 
2.33 The Service issued 238 FPN’s to utility companies during 2022/23 and Table 2 provides
a breakdown of the organisations to whom the majority of the FPN’s were issued.   
2.34 While the Commissioner’s Report highlights that the performance of the Council is
generally to a high standard, the Service recognises the need for further improvement
in the quality of road reinstatements and in minimising inconvenience during future
works. 
Page 334 of 366

Page 335

2.35 Council officers will continue to coordinate all works requested by public utilities and
implement procedures to ensure conformity with the legislative changes outlined
above. Further training will be provided to ensure readiness. 
2.36 The majority of FPN’s issued at present are system generated. These FPN’s are
detected by the Scottish Road Works Register and issued by council officers where the
offences are substantiated. In line with the role out of the additional FPN’s highlighted
in 2.24 above, the Service will develop awareness and capability across the Teams to
increase compliance monitoring.     
2.37 Partnership working with all relevant stakeholders and utilising all available innovation
and technology to better coordinate road works and minimise disruption on the network
will continue. 
3. Measures of success 
3.1  The service continues to perform at or beyond the levels identified within the Office of
the Scottish Road Works Commissioners Report and adapts to the legislative changes
contained within the Transport (Scotland) Act 2019. 
4. Supporting documentation 
Appendix 1  RA Performance Review to North Lanarkshire Council – April 2021 to
March 2023.pdf 
Appendix 2 RA Performance Review to North Lanarkshire Council – April 2021 to
March 23023 – Data.pdf 
Andrew McPherson
Chief Officer (Community Operations) 
Page 335 of 366

Page 336

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 336 of 366

Page 337

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 337 of 366

Page 338

Appendix 1 
Page 338 of 366

Page 339

Page 339 of 366

Page 340

Page 340 of 366

Page 341

Appendix 2 
Page 341 of 366

Page 342

Page 342 of 366

Page 343

Page 343 of 366

Page 344

Page 344 of 366

Page 345

Page 345 of 366

Page 346

Page 346 of 366

Page 347

North Lanarkshire Council
Report
Environment & Climate Change Committee 
Does this report require to be approved? ☒ Yes ☐ No
Ref: JA/AM Date: 23 August 2023 
Transforming Places: Contract Award for Live Labs 2 Professional
Services Support 
From  Andrew McPherson, Chief Officer (Community Operations) 
E-mail mcphersona@northlan.gov.uk Telephone: 07939 280467 
Executive Summary 
Committee is asked to approve the award of a contract for Live Labs 2 Professional Services Support
(the ‘Agreement’) to Amey OW Limited which supports a key project within the Council’s Sustainable
Futures Programme of Work. 
The Agreement is for an initial period of 36 months anticipated to commence on 01 September 2023.
The council reserves the right to extend the Agreement for additional periods up to a maximum of a
further 12 months. 
The maximum value of the Agreement is Two Million, Six Hundred Thousand Pounds Sterling
(£2,600,000) exclusive of VAT. 
Recommendations 
It is recommended that the Environment & Climate Change Committee: 
(1) approves the award of the Agreement to Amey OW Limited at the maximum value of Two
Million, Six Hundred Thousand Pounds Sterling (£2,600,000) exclusive of VAT. 
This recommendation follows the completion of a procurement procedure where the tender
recommended for award has been evaluated as demonstrating Best Value for the council. 
The Plan for North Lanarkshire 
Priority Improve North Lanarkshire's resource base 
Ambition Statement (25) Ensure intelligent use of data and information to support fully evidence
based decision making and future planning 
Item 12
Page 347 of 366

Page 348

1. Background 
1.1 The requirements of the Agreement have never been contracted before by the council
therefore historical contractual information is not available. 
1.2 Decarbonisation of transport in the UK has focused mostly on electric vehicles, active travel
and changing public behaviour rather than the planning and design of transport infrastructure
or local roads assets. However, the UK’s local roads infrastructure and maintenance make a
significant and ongoing contribution to greenhouse gas emissions, climate change impacts
and future resilience. 
1.3 The Association of Directors of Environment, Economy, Planning & Transport (ADEPT) has
developed “Live Labs 2” to support the transition to net zero carbon local roads. 
1.4 Live Labs 2 is: 
• a three-year, £30million, UK-wide programme funded by the Department for Transport
(DfT) that will run until March 2026;
• aimed at the decarbonisation of local roads infrastructure and assets;
• a unique innovation programme, designed to stimulate innovation in the local authority
road sector; and
• seeking to be a multi-stranded transformation programme which will deliver new ways of
working, Business as Usual (BaU) and standards across the four nations’ local roads
sector. 
1.5  The council along with several other partners, successfully bid into the ADEPT Live-Labs 2
programme. The council’s bid ‘UK Centre of Excellence for Materials Decarbonisation in
Local Roads’ focuses around two core elements: 
(1) A UK Centre of Excellence for materials and manufacturing in roads, comprising
standards, knowledge management, a cloud database, global network and systematic
measurement; and 
(2)  A materials testing programme identifying and deploying the top global innovation on UK
roads. 
1.6 The council’s bid application was successful with circa £4.5m worth of funding granted. The
funding package is split over three years on a proposed 40 / 40 / 20 split with funding for year
one already received. 
Page 348 of 366

Page 349

1.7 The Centre of Excellence will support the objectives of the Council’s Climate Plan 2030 by
supporting and driving decarbonisation within our roads infrastructure and is a key project
within the Sustainable Futures Programme of Work. 
1.8 The Council will steer the development and operation of the Centre of Excellence throughout
the period of the Live Lab. During this phase, North Lanarkshire and its partners will seek to
develop a self-financing operational model to enable the Centre to mature beyond the Live
Lab funding period. 
1.9 ADEPT have advised that there will be “Stage Gates” within the Live Labs 2 project around
April 2024 and April 2025. Further funding will not be awarded if ADEPT, via their
Commissioning Board, deem that the council has not made sufficient progress. 
1.10 There is no guidance or details available at time of writing on the requirements to meet these
Stage Gates. It is fundamental to the Agreement that Amey OW Limited fully supports the
council in meeting the requirements of any such Stage Gates as failure to do so would result
in reputational damage to both parties. In the unlikely event of failure to meet the Stage Gate
requirements, this will result in termination / cancellation of the Agreement therefore the
following Stop / Go points are built into the Agreement to mitigate this risk. 
Stop Date Go Date Requirement
31 August
2024
1 September
2024
Project meets ADEPT / DfT Stage Gate requirements for
Year 2 funding
31 August
2025
1 September
2025
Project meets ADEPT / DfT Stage Gate requirements for
Year 3 funding 
1.11 Additionally, the council will be closely working with Transport for West Midlands (TfWM) on
this Agreement alongside other key partners. TfWM were awarded circa £4m in grant funding
on the same theme as the council. Accordingly, the council and TfWM will collaborate to
minimise overhead costs, reduce duplication, and create efficiencies. 
1.12 The services aspect of Live Labs 2 involves the development of a network of global partners
to tackle the core challenges in materials facing the roads sector. Due to the innovative nature
of the Agreement, estimates were based on initial discussions with a variety of different
organisations over a 12-month period. The Agreement requires to be fluid and relies on
utilising respected leaders in a variety of fields to ensure validity and achieving the objective
of becoming an industry recognised Centre of Excellence. 
1.13 As a result, the council require professional services support for development and
management in the creation of the anticipated Centre of Excellence. Accordingly, services
required within this Agreement include but are not limited to: 
• Overall Project Management;
• Database and Industry Knowledge Expertise;
• Legal & Contractual Opinion;
• Communications Direction;
• Carbon Monitoring & Evaluation;
• Academia;
• SME Incubator Programme (upscaling and delivery of local SME’s where possible);
• Specifications & Standards; and Page 349 of 366

Page 350

• Contingency 
1.14 In addition to the services required within this Agreement, a series of construction / works
packages shall also be required to trial / implement the findings. It is intended that these
appointments will be made primarily from the council’s existing Strategic Roads Partnership
and then arrangements awarded via the “Roads and Related Services: Maintenance &
Improvement” agreement currently being procured via the “Enterprise Project”. 
2. Report  
2.1 A group of technical and procurement representatives was formed to develop and agree the
procurement strategy for the Agreement to enable the council to achieve maximum benefit
for the requirements. 
2.2 The initial estimated value of the Agreement dictated that the procurement procedure be
undertaken in accordance with the Public Contracts (Scotland) Regulations 2015. 
2.3 The procurement procedure was undertaken as a “Direct Award” from the Scotland Excel
framework agreement for Engineering and Technical Consultancy, Lot 9 – Project and
Commercial Management (the “Framework”). Following the justification detailed and
appraised within the associated contract strategy document, the Direct Award procedure was
considered to demonstrate Best Value for the council as Scotland Excel undertook a rigorous
and detailed market analysis / appraisal exercise prior to procuring the Framework in which
Amey OW Limited were appointed. 
2.4 The tender received from Amey OW Limited underwent appropriate appraisal to ensure it
was complete / compliant with the council’s requirements and demonstrated best value. 
2.5 In addition Amey OW Limited were involved in the management of two successful projects
during Live Labs 1 hence the programme management team bring significant experience to
this Agreement. Recognising and exploiting the synergies between Live Labs 1 & 2 will
enable closer collaboration and delivery of the interconnected themes. 
2.6 Amey OW Limited are also our incumbent term maintenance provider and therefore we have
a good working relationship in place which will further benefit the delivery of this agreement
and the wider Live Labs 2 project e.g. materials testing. 
2.7 Further details of the procurement procedure is provided in Appendix 1 and the SME status
and location of the tenderer is located within Appendix 2. 
2.8 The maximum value of the Agreement is Two Million, Six Hundred Thousand Pounds Sterling
(£2,600,000) exclusive of VAT including any option to extend the Agreement. 
2.9 The costs associated with delivery of the Agreement will be fully funded via the grant received
from the Department of Transport. 
Price Savings / Increases 
2.10 The pre-tender whole life estimate for the Agreement was £2,345,650. 
Page 350 of 366

Page 351

2.11 At time of tendering the Framework, Scotland Excel conducted a price benchmarking
exercise comparing its hourly rates with those previously used by councils and associate
members, which demonstrated an average saving of 3.7%. However, since award of the
Framework, pricing has increased in accordance with the applied approach due to external
factors such as inflation. Accordingly, the maximum budget for the Agreement has been
increased to £2,600,000 to enable service delivery throughout the anticipated whole life term. 
2.12 Rates have been benchmarked against other framework suppliers evidencing competitive
response. 
Price Stability 
2.13 The pricing mechanism applied within the Agreement follows the guidance and conditions
permitted within the Framework. The Agreement shall be governed in accordance with the
industry recognised set of conditions: NEC4 Professional Services Contract (June 2017),
Option A – Priced Contract with Activity Schedule. 
2.14 Salary Banded Rates, overhead percentages and fee percentages are fixed for the entire
duration of the Framework and are therefore applicable within the Agreement. Professional
Title Rates are fixed for minimum periods of 12 months with any increase limited to the
general rate of inflation. 
Community Benefits 
2.15 The council is committed to maximising the delivery of community benefits. The procurement
included a community benefit requirement, this approach is designed to deliver local
community benefits where possible. 
2.16 Within their tender, Amey OW Limited committed to deliver community benefits in line with
the requirements of the Framework. The specific detail of these benefits will be developed
during the mobilisation period of the Agreement.    
2.17 The community benefits to be delivered as part of the Agreement includes the creation of a
“Project Manager” role on a permanent basis, to be based in Central Scotland and be
dedicated to the Agreement over its lifespan. This post will be recruited by Amey OW Limited
who have committed to retaining & funding the role after the expiry of the Agreement. 
2.18 Due to the nature and financial value of this Agreement, both the council and Amey OW
Limited have agreed to increase opportunities for collaboration, and to increase the delivery
of training and development which is hoped to benefit a significant number of organisations
locally, nationally and internationally going forward. 
Fair Work First  
2.19 Within their tender submission, Amey OW Limited confirmed their commitment to the
following areas of the Scottish Governments “Fair Work First” initiative: 
• Payment of the real living wage; 
• No zero hour contracts;
• Appropriate channels for effective voice; 
• Investment in workforce development,  Page 351 of 366

Page 352

• Action to tackle the gender pay gap and create a more diverse and inclusive workplace;
and
• Offer flexible and family friendly working practices for all workers from day one of
employment. 
Contract Management 
2.20 Officers from Community Operations will be responsible for managing the Agreement which
will be undertaken in accordance with the council’s agreed approach to contract and supplier
management. 
3. Measures of success 
The Agreement will deliver the following outcomes; 
3.1 The appointment of a Service Provider who has the experience and capability to deliver an
innovative, high quality and responsive service. 
3.2 The procurement procedure is compliant with procurement legislation and internal
procedures. 
3.3  Best Value being delivered (see item 2.4). 
3.4  Securing a range of community benefits. 
3.5 Drive government objectives towards Net Zero and a sustainable future and enabling
innovation and change to Business as Usual. 
3.6 The Centre of Excellence will become a single source of truth for materials testing within the
highways sector. 
4. Supporting documents 
Appendix 1 Summary of Procurement Process
Appendix 2           SME Status and Location of All Tenderers 
Andrew McPherson
Chief Officer (Community Operations  
Page 352 of 366

Page 353

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Project is fully funded by external bodies. Finance Team made aware of all potential
financial impacts. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data? 
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-mailed
to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Page 353 of 366

Page 354

Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Project is focused on decarbonisation of road materials and supports the objectives of
councils Climate Plan 2030 with Climate Change Lead Officer supporting relevant
workstreams. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Corporate Communications are involved in the project’s communications strategy and in
providing ongoing comms support throughout the lifespan of the Live Labs project. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts, highlighting
where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk
Registers), and how they are managed? 
Governance of the Project includes a Steering Board whose duties include ensuring risks
are managed effectively. The major risk to the council is of reputation damage should the
project team fail to deliver and not provide sufficient progress to achieve year 2 or year 3
funding. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does
it relate to healthcare, housing, or education services for in-Service or ex-Service
personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to ensure
there has been appropriate consideration of the particular needs of the Armed Forces
community to make sure that they do not face disadvantage compared to other citizens in
the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service delivery,
policy, or plan that has an impact on children and young people up to the age of 18, or on
a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles from the
United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been carried
out?  Page 354 of 366

Page 355

Yes ☐ No ☐  
Page 355 of 366

Page 356

Appendix 1 – Summary of Procurement Process
CPT Contract Reference Allocated: NLC-CPT-22-155
Procurement Procedure Utilised: Direct Award From Framework Agreement
Governing Legislation / Regulations: Public Contracts (Scotland) Regulations
2015
Date Contract Strategy Approved: 14 February 2023
Framework Owner: Scotland Excel 
Framework Title: Engineering & Technical Consultancy 
Framework Reference Number: 08-20
Lot Reference / Title: Lot 9 – Project and Commercial
Management 
Date ITT Published: 19 June 2023
Tender Platform Utilised: PCS Quick Quote (PCSQQ)
Tender Return Deadline: 26 June 2023
Number of Tenders Received: 1
Tenders Received from SME’s: 0
Tenders Received from NLC Based Tenderers:  0
Number of Recommended Tenderers: 1
Assessment Team: Roads and Lands Maintenance team  
Anticipated Agreement Start Date: 01 September 2023
Total Agreement Period (Months): 36 + 12
Maximum Total Agreement Value: £2,600,000 
Page 356 of 366

Page 357

Appendix 2 – SME Status and location of all Tenderers 
Name of Tenderer
Size of Tendering
Organisation
(Micro, Small,
Medium or Large)
Location
(Local Authority /
Council Area)
Amey OW Ltd Large  London 
Page 357 of 366

Page 358

Page 358 of 366

Page 359

North Lanarkshire Council
Report
Environment and Climate Change Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref BF/JMcK Date 23/08/23 
Contracts awarded below Committee approval threshold 
From  Chief Officer (Assets and Procurement)  
Email mckinstryj@northlan.gov.uk   Telephone James McKinstry
07939 281102 
1. Background 
1.1 The Councils General Contract Standing Orders (the ‘GCSOs’) outline financial
approval thresholds for contracts for goods, works and services. Contract awards
above £500,000 for Supplies and Services and above £2,000,000 for Works require
approval by the Committee. These contract awards are considered by the Committee
on a case-by-case basis. 
1.2 Where the value of a contract award is between £50,000 and £500,000 for Supplies
and Services and between £500,000 and £2,000,000 for Works, GCSOs require that
the Chief Officer of Assets and Procurement award these contracts on behalf of the
appropriate Chief Officer. 
1.3 The Chief Officer of Assets and Procurement is required to notify Committee on a
regular basis of any such contracts awarded on behalf of Procuring Service Areas. 
Executive Summary 
This report notifies the Committee of the contracts awarded between 1 April 2023 to 30
June 2023. It sets out those contracts awarded with a value below the financial threshold
requiring Committee approval. 
Recommendations
It is recommended that the Environment and Climate Change Committee: 
(1) are advised of the Contracts awarded below Committee approval threshold
between 1 April 2023 to 30 June 2023 as per the process within the Council’s
General Contract Standing Orders.   
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (17) Ensure we keep our environment clean, safe, and attractive
Item 13
Page 359 of 366

Page 360

2. Report 
2.1 The GCSOs require that contracts in excess of £500,000 for supplies and services and
£2,000,000 for works are approved, on a case-by-case basis, by the Committee before
award. 
2.2 The GCSOs require that contracts with a value above £50,000 but less than £500,000
for Supplies and Services and above £500,000 but less than £2,000,000 for Works are
awarded by the Chief Officer of Assets and Procurement on behalf of the appropriate
Chief Officer. 
2.3 The contracts awarded by the Chief Officer of Assets and Procurement that are under
the £500,000 Committee financial approval threshold for Supplies and Services and
£2,000,000 for Works in the period from 1 April 2023 to 30 June 2023 are detailed in
Appendix 1. 
3. Measures of success 
3.1 Contracts support the delivery of Council and service priorities. 
3.2 Appointment of contractors who have suitable experience and capability to deliver the
required supplies, services or works. 
3.3 Contracts awarded by the Council are compliant with GCSOs and procurement
legislation. 
3.4 The Council’s Contract Register is kept updated by services and management
information is comprehensive and accurate. 
3.5 Best Value is both demonstrable and achieved.     
4. Supporting documentation 
4.1 Appendix 1 - Summary of contracts awarded. 
James McKinstry
Chief Officer (Assets and Procurement) 
Page 360 of 366

Page 361

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Where Financial impacts have been identified, they have been established and 
addressed in each specific Contract Strategy and incorporated into the project.   
The Council’s Procurement Strategy proposes methods of maximising the delivery
of procurement benefits that could bring improved financial return to the Council
and the areas wider economy. Certain benefits have a monetary value attached 
and these will be monitored on a project-by-project basis. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Where HR impacts have been identified, they have been established and
addressed in each specific Contract Strategy and incorporated into the project.   
Contracts awarded by the Council are compliant with GCSOs and procurement
legislation. 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Where Legal impacts have been identified, they have been established and 
Page 361 of 366

Page 362

addressed in each specific Contract Strategy and incorporated into the project.   
Contracts awarded by the Council are compliant with GCSOs and procurement
legislation. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
All contracts listed have been assessed by the Enterprise Architecture Governance
Group (EAGG). 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☒ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Sustainable procurement is one of the key objectives of the Council’s Procurement
Strategy and will have a positive impact, including, embedding sustainable
procurement as business as usual and incorporating community benefits into the
Councils contracts. Supporting local businesses and SMEs through closer working
with colleagues in the Council’s Enterprise department and by making our
processes more streamlined and accessible. 
Where Environmental/Carbon impacts have been identified, they have been 
established and addressed in each specific Contract Strategy and incorporated into 
the project.  
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact?
Page 362 of 366

Page 363

Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Where Risk impacts have been identified, they have been established and 
addressed in each specific Contract Strategy and incorporated into the project. 
Contract award procedures may be susceptible to legal challenge if they are not
discharged in accordance with GCSO and procurement legislation. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 363 of 366

Page 364

APPENDIX 1 – SUMMARY OF BELOW THRESHOLD CONTRACT AWARDS
Contract Description Contract
Award
Date
Contract
Start   
Date
Contract
End Date
Contract
Extension
Contract
Value (inc
extension)
(£s)
Successful
Tenderer 
Supplies
Services
Works
No of
Tenders
Received 
Route*
Belziehill Interchange - Detailed
Design 28/04/2023 01/05/2023 30/09/2023 28/02/2024 £81,848.74 Systra Ltd Services 1 *DAF3
NLC Ash Dieback Disease
Action Plan 25/05/2023 26/05/2023 22/11/2023 N/A £63,250.00 Mott MacDonald Services 1 **DAF3
Maintenance and Servicing
Contract for Automatic Air
Monitoring Equipment
29/05/2023 03/07/2023 03/07/2026 03/07/2029 £200,000.00 ACOEM UK Ltd Services 1 ***CO 
*Direct Award from the Scotland Excel Engineering & Consultancy Services Multi-Supplier Framework, Lot 2 - Traffic & Transportation Services
to best value provider.
**Direct Award from the Scotland Excel Engineering & Consultancy Services Multi-Supplier Framework, Lot 9 - Project & Commercial
Management to best value provider.
***Open Procedure contract awarded to best value provider.   
Key – Procurement Route
CO -   Contract Open Procedure
CR -   Contract Restricted Procedure
FO -   Framework Open Procedure
FR -   Framework Restricted Procedure
Page 364 of 366

Page 365

FMCC - Mini Comp Council Framework
FMC3 - Mini Comp 3rd Party Framework
DAFC - Direct Award Council Framework
DAF3 -  Direct Award 3rd Party Framework
DAH&SC - Direct Award Health & Social Care Related Services
N -   Negotiated Contract
EXT -  Extension to Contract/Framework 
Page 365 of 366

Page 366

Page 366 of 366