North Lanarkshire Council
Report
Environment and Climate Change Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  Date 08/02/23 
Prioritisation of Road Safety Improvements 
From  Pamela Humphries, Chief Officer of Place  
E-mail woodg@northlan.gov.uk Telephone Gary Wood 07939 284954 
Executive Summary
The purpose of this report is to seek approval for implementing a revised policy for
prioritising traffic calming and pedestrian crossing requests.
Recommendations
It is recommended that the Committee: 
1. Recognise the importance of having an updated, fair, and transparent
assessment process for road safety requests to ensure the Council’s finite
resources are targeted to the areas in communities with the highest risk setting. 
2. Approve the policy for prioritising traffic calming and pedestrian crossing
requests as outlined in Appendix 1 and Appendix 2 of the report. 
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (17) Ensure we keep our environment clean, safe, and attractive

Page 2

1. Background 
1.1 The Road Traffic Act 1988, section 39, makes provision for each local authority to carry
out studies into accidents and to take steps to both reduce and prevent accidents.  This
places a duty on each local authority to: 
a)   Carry out studies into accidents arising out of the use of vehicles on roads or parts
of roads, other than trunk roads within their area; and
b)  in the light of those studies, take such measures as appear to the authority to be
appropriate to prevent such accidents. 
To comply with its obligations, the Council maintains a road accident database using
information provided by Police Scotland, which is updated monthly. 
1.2 The Council frequently receives requests for a wide range of road safety improvements. 
These requests, which typically exceed 200 per annum, are predominantly for traffic
calming measures or pedestrian crossings.  It is not possible for the Council to action
all requests within available budgets. 
1.3 On 26 May 2011, the Planning and Transportation Committee approved the traffic
calming priority list. These were sites with more than five injury accidents over a three-
year period. In the time since the traffic calming priority list was established, many
attributing factors and considerations have changed. Basing the need for road safety
improvements on a threshold of five injury accidents over a three-year period has its
limitations.  Roads that are longer in length than others have a greater likelihood of
reaching the threshold for road safety interventions.  Furthermore, it is often suggested
that focusing the assessment process solely on the accident history at a location, is a
reactive approach to accident investigation and prevention. 
1.4 At present, the Council does not have an approved policy for prioritising pedestrian
crossing requests.  For many years, the industry standard process to determine the
need for a pedestrian crossing, has been based on the degree of conflict between
pedestrians (P) and vehicles (V). This is known as the PV2 assessment, and surveys
are undertaken to identify the four peak hours with the greatest conflict between
pedestrians and vehicles. 
1.5 The Council has continued to use the PV2 assessment as the basis for prioritising
requests for pedestrian crossings. However, it is not without its limitations as every
pedestrian is considered to have the same requirements, irrespective of age or ability. 
Recent studies have found that vulnerable pedestrian groups feel that their road safety
needs are not being met by the PV2 assessment process. 
1.6 Due to the limitations of existing processes for prioritising road safety improvements,
including requests for traffic calming and pedestrian crossings, it was deemed
necessary to develop alternative methodologies that address community needs and
make better use of the Council’s resources. 
2. Report
2.1 Although the Council typically receives more than 200 requests for traffic calming
measures or pedestrian crossings, it is only possible to implement around five schemes
per year due to budget constraints. Therefore, it is essential that there is a fair and
transparent process to rank and prioritise schemes.

Page 3

2.2 A new staged assessment and prioritising methodology is proposed which would apply
to both traffic calming and pedestrian crossing requests. Thresholds would be applied
at each stage to determine whether a request proceeds to the next stage of
investigation. This methodology builds upon both the existing approved traffic calming
process and the PV2 assessment methodology, but with new considerations added.
This enables the assessment process to take better account of road safety and
environmental factors on a site-by-site basis. It also enables the pedestrian crossing
assessments to be closer aligned to new national guidance. 
2.3 The proposed assessment criteria for pedestrian crossings and traffic calming are
provided in the appendices. 
2.4 On completion of the assessment process, any site meeting the relevant total threshold
value will be ranked and prioritised for undertaking feasibility appraisals and, where
appropriate, detailed design work. It should be noted that triggering the required
thresholds will not guarantee that a site progresses to a feasibility assessment and
detailed design.  The number of sites targeted each year will be dependent on the
available budgets. 
2.5 Those locations that trigger the thresholds, but are not taken forward to the
implementation stage, will be retained on the priority list.  The priority list will be updated
each March to determine which schemes are taken forward for implementation during
the forthcoming financial year. 
2.6 Given the high number of requests received each year, and the limited number of
schemes that can be implemented, repeat investigations will not be undertaken at the
same location within an 18-month period. These would only be undertaken if there were
to be a material and demonstrable change to traffic conditions. 
2.7 Each year, there will be a review of Police Scotland’s accident data across the entire
North Lanarkshire road network.  This will identify accident clusters and inform the
Council’s own priorities for road safety improvements.  Any identified accident clusters
will go through the proposed assessment methodology and may alter the priority
ranking list. It should be noted that the accident history at every site on the priority list
will not be routinely revisited each year. 
3. Measures of success 
3.1  Reduction in the number and severity of recorded road injury accidents across the
Council’s network.   
4. Supporting documentation 
Appendix 1 – Scoring Matrix 
Appendix 2 – Assessment Methodology Flow Chart 
Pamela Humphries
Chief of Officer of Place

Page 4

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact?
The Council’s Road Safety budget is typically £400,000 per annum which is part of
in the Service’s 5-year Capital programme – 2021/22 to 2025/26 budget allocation.
This may be supplemented by external sources, should annual funding bids be
successful. All projects identified and prioritised as part of this process will only be
taken forward if budgets are available at that time.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐

Page 5

5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact
Is there a risk impact?
Yes ☐ No ☒
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.

Page 6

Appendix 1
Scoring Matrix
Stage 0 - Pedestrian Crossing Demand
This stage applies only to requests for pedestrian crossings. Requests for traffic calming
measures proceed straight to Stage 1. 
To determine the need for a pedestrian crossing, surveys will be undertaken to identify the four
peak hours with the greatest conflict between pedestrians (P) and vehicles (V). This is known
as the PV2 assessment. 
For example, if there were an average of 50 pedestrians and 600 vehicles recorded in the four
busiest hours, the PV2 value would be 50(P) x 600(V) x 600(V) = 18 million. 
Any site with a PV2 of 60 million or greater will proceed to Stage 1 for further investigation as
this will satisfy the minimum threshold score of 80, which is calculated by dividing the PV2 value
by 750,000. 
Stage 1 – Road Safety Indicators
For every request relating to traffic calming, speeding concerns, road safety issues or
pedestrian crossings, a seven-day classified traffic volume and survey will be undertaken.  This
survey will record the two-way traffic flows, the vehicle composition, and establish the average
bi-directional 85th percentile speed.   
Police Scotland’s database will be interrogated to establish the accident history, including
those including pedestrians, at the locations under consideration.  This review will be for the
most recent five-year period that data is available.  To ensure that the accident history is
scalable, and the results are proportionate, the number of accidents will be measured against
the length of the street or area under consideration. 
The following scoring methodology will be applied to all sites to determine whether they meet
the Stage 1 threshold score for Road Safety Indicators. 
Criteria Description Score 
Accident History
(per accident for the most recent
5 year period) 
Slight 20
Serious 40
Fatal 80 
Speed
(percentage over speed limit)
0% - 10% 5
10% - 20% 10
20% - 30% 20
30% - 50% 30
50% and above 40 
Traffic Volume
(average daily flow)
Per 1000 vehicles 1   
Vehicle Composition >10% HGVs
(7.5t and above)
5
STAGE 1 THRESHOLD  80

Page 7

Only sites that score more than the Stage 1 threshold will proceed to Stage 2 for further
investigation to identify potential traffic calming measures. 
Pedestrian crossing sites that met both Stage 0 and Stage 1 thresholds will proceed to Stage
2 for further investigation about installing a pedestrian crossing. 
Stage 2 – Environmental Factors
Proximity to local trip attractors form the basis of the Stage 2 assessment, as the risk setting
will be higher in and around places such as schools, hospitals, medical centres etc., where
there is likely to be a higher proportion of vulnerable road users. 
Two additional environmental factors will be assessed for pedestrian crossing sites during
Stage 2. These factors will take account of vulnerable users and road widths. 
The following scoring methodology will be applied on a site-by-site basis 
Criteria Description Score
Local Trip
Attractors
(within 200m of traffic
survey locations)
School / Nursery School Entrance 15
Significant route to school (other than above) 10
Hospital, Doctors, Nursing Home, Home for Elderly 10
Park / Playpark Entrance (not associated with school) 5
Shops 5
Bus Stops within 400m of count location 5
Health Centre 3
Community; Sports Centre 3
Footway on both sides (no = gets a score) 3   
Additional Factors for Pedestrian Crossings Only
Vulnerable Users Children, elderly or mobility impaired >15% of total
pedestrians
5
Road Width Less than 7.3 metres
Between 7.3 and 10 metres 
Over 10 metres
0
10
15 
Ranked and Prioritised Sites
The score obtained in Stage 2 will be added to the scores obtained from the previous stage(s)
to determine whether the following overall threshold values have been met for each site.   
Pedestrian Crossing Sites
Stage 0 Threshold 80
Stage 1 Threshold 160
Stage 2 Threshold 220  
Traffic Calming Sites
Stage 1 Threshold 80
Stage 2 Threshold 130

Page 8

Appendix 2 
Assessment Methodology Flow Chart