North Lanarkshire Council · 29 April 2026
Back to Environment and Climate Change Committee — 29 April 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

20 April 2026 
Members of the 
Environment and Climate Change Committee
Chief Executive’s Office
Rachel Blair
Chief Officer (Legal, Democratic and Strategy)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk 
Notice is given that a Meeting of the Environment and Climate Change Committee is to
be held in the Council Chamber, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on
Wednesday, 29 April 2026 at 14:00 PM which you are requested to attend. 
The agenda of business is attached. 
Rachel Blair
Chief Officer (Legal, Democratic and Strategy) 
Members : 
Clerk Name: Mark Hamill
Clerk Telephone: 07811 294 702
Clerk Email: committee@northlan.gov.uk 
H Loughran, J McPhilemy, T Carragher, K Duffy, A Duffy-Lawson, F Fotheringham, W
Goldie, K Harmon, J Leckie, F MacGregor, A Masterton, M McBride, B McCulloch, M
McCulloch, F McKay, J Reddin, L Roarty, G Robinson, W Shields, A Smith, A Thomas, S
Watson, C Williams, N Wilson.  
Page 1 of 228

Page 2

Page 2 of 228

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical
Standards In Public Life Etc. (Scotland) Act 2000 
Operational 
2 Trading Standards – focus on consumer product
safety work
Submit report by Chief Officer (Community Operations)
setting out the consumer product safety initiatives
delivered by the Trading Standards team. 
5 - 20 
3 Development of an Action Plan for Graffiti
Submit report by Chief Officer (Community Operations)
seeking approval for the establishment of a
multiagency working group to address graffiti across
North Lanarkshire. 
21 - 28 
4 Dumbrek Local Nature Reserve - Bringing Life to
Heritage
Submit report by Chief Officer (Community Operations)
highlighting the completion of phase 2 of the Dumbreck
& Garrell Burn Project. 
29 - 40 
5 Redevelopment of Colzium House, Kilsyth
Submit report by Chief Officer (Community Operations)
providing an update on the work undertaken and future
plans at Colzium House, Kilsyth. 
41 - 48 
6 Fleet Asset Management Plan 2026-2035
Submit report by Chief Officer (Community Operations)
seeking approval of the Fleet Asset Management Plan. 
49 - 72 
7 Road Safety Plan
Submit report by Chief Officer (Place) provides an
update on the implementation of the policy for
prioritising road safety improvements. 
73 - 98 
8 20mph Speed Limits Case for Change
Submit report by Chief Officer (Place) to proceed with
the consultation on the rollout of 20mph roads across
North Lanarkshire. 
99 - 108 
9 Roads Asset Management Plan 2026-2030
Submit report by Chief Officer (Community Operations)
seeking approval of the Roads Asset Management
Policy and Plan. 
109 - 164
Page 3 of 228

Page 4

10  Electric Vehicle Charging Infrastructure Update
April 2026 Transfer of Asset Ownership
Submit report by Chief Officer (Community Operations)
seeking approval and Transfer of Ownership of the
future North Lanarkshire EV charging infrastructure to
the new Charge Point Operator. 
165 - 176 
11  North Lanarkshire's Path to Net Zero (2045)
Submit report by Chief Officer (Assets & Procurement)
seeking approval to replace the current Climate Plan
Act 2030 (2021- 2030), our Path to Net Zero (2045) 
177 - 220  
Contracts 
12  Contract Awards Below Committee Approval
Threshold
Submit report by Chief Officer (Assets and
Procurement) advising of contracts awarded since the
last meeting. 
221 - 228 
Page 4 of 228

Page 5

North Lanarkshire Council
Report
Environment & Climate Change Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    PB/MM Date 29/04/26 
Trading Standards – focus on consumer product safety work 
From  Lyall Rennie, Chief Officer (Community Operations)  
E-mail RennieLy@northlan.gov.uk   
Executive Summary 
At the last meeting of the Environment and Climate Change Committee, elected members
requested further detail on the consumer product safety initiatives delivered by the Trading
Standards team, to support information sharing with Community Boards and constituents.
The Committee has previously demonstrated its commitment to this area, for example in
supporting North Lanarkshire becoming a signatory to the button battery awareness pledge
at the meeting held on 9 November 2022. 
Over the past 18 months, the Trading Standards service has delivered three key initiatives: 
• a programme to identify and support North Lanarkshire based online sellers in
understanding their product safety responsibilities, 
• a public awareness campaign highlighting the significant safety risks associated
with second hand consumer goods supported through external funding from the
Office for Product Safety and Standards (OPSS), and 
• a targeted electrical item safety amnesty funded by Electrical Safety First (ESF)
which offered consumers the opportunity to exchange unsafe products for safer
alternatives. 
These initiatives focused on increasing public awareness of safety risks and supporting
businesses to meet their legal responsibilities. 
Alongside these preventative initiatives, the service made significant reactive interventions
arising from consumer complaints, safety referrals and service requests, ensuring that
unsafe products were identified, investigated and, where necessary, removed from sale
and supply. This combined approach of prevention, intervention and partnership working
reinforces the Council’s commitment to protecting consumers, supporting legitimate
businesses and contributing to wider corporate priorities on community wellbeing and
safety. 
Page 5 of 228

Page 6

Recommendations
It is recommended that the Environment & Climate Change Committee: 
(1) Recognise the significant community benefit delivered through these consumer
product safety initiatives and related enforcement work. 
(2) Support the promotion of these and future initiatives within local communities
and through elected members’ own communication channels and
representation on community boards, helping raise awareness of key risks. 
(3) Support continued awareness raising activity to help residents identify unsafe
products and make safer purchasing decisions, with a particular focus on
families and vulnerable households. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Page 6 of 228

Page 7

1. Background 
1.1 Unsafe consumer products can cause severe harm, with past incidents showing that
faults in everyday household items can lead to serious injuries and/or fatalities. The
growth of online purchasing and the rise in homebased sellers have also increased the
complexity of safety risks and the need to support businesses in understanding their
product safety responsibilities. Local authority Trading Standards services are charged
with the regulatory functions and statutory duties implemented to safeguard the public
from unsafe consumer products. 
1.2 North Lanarkshire Council was one of eight Scottish local authorities participating
between October 2024 and March 2025 in a national online sellers project aimed at
identifying local businesses trading online and assessing their understanding of product
safety responsibilities. The project highlighted the challenges faced by Trading
Standards in identifying businesses and their controlling legal minds, as there is
currently no requirement for sellers to register with local authorities. 
1.3 In August 2025, the team successfully secured funding from OPSS Community Fund
to deliver a dedicated second-hand goods product safety initiative. This opportunity
arose in direct response to growing safety concerns linked to second-hand consumer
products, particularly those used by or accessible to children. Intelligence gathered
internally from partner agencies and via national alerts has highlighted recurring risks
associated with toys, items containing button or coin batteries, child appealing high-
powered magnets, nursery equipment, children’s clothing and small electrical goods.
These products are frequently traded at car boot sales, baby markets, informal
community events and online platforms, often without adequate safety checks or seller
awareness of their legal responsibilities. The combination of high-risk products and
informal selling environments means that vulnerable households, especially families
relying on low-cost second-hand items, are disproportionately exposed to the risk of
injury or worse. 
1.4 In recent years, incidents reported in the media have highlighted the very real dangers
posed by unsafe second-hand goods, including a tragic local child fatality involving a
button battery. Media reports have also shown that many parents are unaware that
everyday household items purchased second-hand can present severe risks until their
child experiences an accident or near miss. These incidents reinforce the need for clear
public information and proactive intervention. Safety risks can arise at the point of
purchase, where buyers may unknowingly acquire damaged or noncompliant items,
and during use, where missing instructions, faulty components or wear and tear
increase the likelihood of choking, poisoning, burns or electrocution. 
1.5 A focused product safety initiative aimed at improving public awareness and supporting
residents to make safer purchasing decisions was developed. The initiative was
designed to deliver clear, practical information on identifying unsafe or recalled
products, recognising hazards linked to button batteries and high-powered magnets
and assessing the condition and compliance of second-hand electrical items, toys and
children’s products. In May 2025, a UK study found that around 300 children were
admitted to A&E in a single year after ingesting small, high-powered magnets, with one
in ten requiring lifesaving surgery - https://research.uhs.nhs.uk/news/doctors-warn-of-
magnetic-toy-dangers-as-study-reveals-hundreds-of-children-hospitalised 
1.6 To ensure the initiative reached those most likely to rely on second-hand goods, the
service worked closely with colleagues in the Tackling Poverty and Community Safety
teams, foodbanks and local event organisers. Engagement was centred in community
settings including car boot sales, baby markets, foodbanks, colleges and seasonal
Page 7 of 228

Page 8

fayres, supported by a complementary social media campaign to extend reach. This
combined approach was intended to empower vulnerable households with the
knowledge needed to reduce harm and to strengthen understanding of consumer
product safety. 
1.7 Funding was secured from Electrical Safety First to deliver a product safety amnesty to
address the risks posed by unsafe electrical goods, particularly low-cost chargers,
electric blankets, travel adaptors, four-way block adaptors and other small electricals.
During the amnesty events, portable appliance (PAT) testing and assessment of items
was made available and where products were found to be unsafe, they were
exchanged for safer replacements or a voucher. Worn electric blankets were replaced
like for like. 
1.8 Alongside the education and awareness activities, local authority Trading Standards
services have a statutory duty to enforce consumer product safety legislation, while
OPSS provides national oversight. Our Trading Standards team meets this
responsibility by investigating complaints received, through targeted enforcement
projects to address unsafe products identified through complaints, via intelligence
gathering and national alerts. This work supports the wider aim of reducing the
availability of unsafe goods on the UK and Scottish marketplace. 
2. Report 
Online Sellers Project 
2.1 The online sellers project provided the service with a structured opportunity to identify
North Lanarkshire based businesses trading through online platforms and assess their
baseline understanding of product safety requirements. The project enabled officers to
engage directly with sellers, offer tailored advice on legal responsibilities and direct
participants to accredited training provided through the Chartered Trading Standards
Institute. The findings from this work also reinforced the ongoing challenges in locating
and supporting online traders, particularly where individuals operate informally or
without any requirement to register with the local authority. 
2.2 Outcomes of the project included 55 locally based online businesses being identified
(with assistance from our colleagues in the council’s Enterprise team) and contacted.
6 businesses progressed to accredited product safety training, and several others
chose to change the way they were trading following engagement, reflecting improved
awareness of their legal responsibilities. The project therefore succeeded in increasing
the visibility of Trading Standards within this sector and prompting positive behavioural
change among online sellers. 
Second-Hand Goods Education Initiative 
2.3 The initiative was delivered through a programme of community engagement events
across North Lanarkshire, with practical, hands-on demonstrations to help residents
recognise unsafe second-hand goods. Displays included examples of children’s
clothing with cords presenting entrapment or strangulation hazards, toys with
accessible stuffing or small parts, electrical items showing damaged wiring, and
products containing unsecured button batteries or small, powerful magnets, as shown
in appendix 1. These items were used to demonstrate simple checks that consumers
can carry out before buying used products. Events were held in high footfall locations
such as car boot sales, baby markets, colleges and foodbanks to ensure engagement
Page 8 of 228

Page 9

with families and households most likely to rely on second-hand goods. A list of the
events attended can be found in appendix 2. 
2.4 A complementary social media campaign ran in the lead up to Christmas 2025,
supporting the in-person events and sharing short clips and advice on identifying
unsafe goods. The clip can be viewed on the council webpage here. 
2.5 Alongside this education work, Trading Standards carried out a targeted enforcement
project to examine second-hand goods available in retail premises. Officers inspected
a wide range of items similar to those used in the public displays, identifying issues
such as insecure battery compartments, damaged electrical components and unsafe
toys. Where problems were found, officers provided tailored advice, and through
effective engagement with the businesses we ensured that retailers voluntarily
removed unsafe products from sale. 
2.6 The combined education and enforcement approach delivered clear and measurable
impact. Over 1900 residents engaged directly with officers across 11 events, and the
visual demonstrations proved particularly effective, with many attendees expressing
surprise at how easily everyday items could present hazards. Attendees were asked to
complete a survey which showed a strong improvement in consumer confidence, with
almost all respondents reporting that they felt better equipped to identify unsafe goods
after visiting the stall. 
Product Safety Amnesty 
2.7 The product safety amnesty, supported by funding from ESF, was delivered through
community-based engagement events combining practical demonstrations, free PAT
testing and an ‘Unsafe Electricals Amnesty.’ Officers attended sessions at Wishaw
Foodbank, Bellshill Cultural Centre, the Antonine Shopping Centre, and the Buchanan
Centre Coatbridge, offering attendees clear guidance on how to recognise hazards
such as damaged charging cables, faulty adaptors, recalled appliances and unsafe
electrical goods. Real examples were used to illustrate common risks and to show
residents quick, simple checks they can carry out at home. At the time of writing this
report, further events are scheduled to take place at Forgewood Housing Cooperative
and Motherwell Foodbank, to ensure continued engagement with households most
likely to rely on low-cost or second-hand electrical items. The initiative was publicised
through posters at the venues (example in appendix 3), the Council webpage and
locality social media pages, encouraging residents to attend and bring items for
assessment - https://www.northlanarkshire.gov.uk/winter-services/consumer-
advice/electrical-product-amnesty 
2.8 Amnesty event safeguarding activities have resulted in the safe surrender of several
hazardous items, including a blender, electric blankets and a damaged mobile phone
charging cable which a parent discovered in their child’s bedroom after attending the
event. The amnesty has encouraged residents to check items at home and return with
anything they were concerned about, and the PAT testing service has supported people
in understanding the condition of items they regularly use. Feedback from participants
highlighted that the demonstrations helped them identify risks they had never
previously considered. This feedback directly informed the planning of the two events
in Motherwell. 
2.9 Although assessment of the programme is ongoing, early impact is clear. Attendees
have reported an increased ability to recognise unsafe electrical goods and several
returned with further items for assessment after undertaking checks at home. The
surrender of damaged and potentially dangerous products demonstrates that residents
Page 9 of 228

Page 10

are acting on the advice provided and removing hazards from their homes. Feedback
from the first four events shows strong demand for continued engagement, with many
residents requesting repeat sessions to support them in checking additional items. 
Enforcement Activity Summary 
2.10 The Trading Standards service delivers targeted enforcement interventions to address
unsafe products identified in the marketplace. Below is a sample of complaints and
projects led by the team: 
• Mothballs containing banned carcinogenic ‘naphthalene.’ A complaint led to
the identification of mothballs sold via an online marketplace containing
naphthalene, a prohibited substance, and lacking manufacturer information. It was
identified that a total of 4,939 units had been sold via a business based outside of
the UK. A referral resulted in customer alerts being issued and 364 units being
removed from warehouse stock for destruction. Our engagement with OPSS
resulted in their publishing a safety alert -
https://assets.publishing.service.gov.uk/media/67ab24124a8e03aa8a56aa17/250
1-0066-product-safety-report-mothballs-pdf.pdf 
• Water Beads - A complaint was received about a children’s science kit containing
water beads that expanded far beyond safe limits during one of the experiments.
Testing confirmed that the beads increased to more than 50% of their original size,
presenting a serious risk of gastrointestinal blockage if swallowed in their
dehydrated form, and a risk of airway obstruction if swallowed when hydrated.
Water beads have been linked to severe injuries in the UK, including emergency
surgery for intestinal obstruction, and to child fatalities overseas. Officers raised the
issue with the local authority Trading Standards service with jurisdictional
responsibility for the business and led corrective action to warn consumers and
withdraw the product from the market. OPSS published the safety alert - Product
Safety Report: Letterbox Lab Explore Box 9 and Investigate Box 9 Child's Science
Experiment Kit containing Water Beads (2501-0087) - GOV.UK 
• Building Blocks - A complaint was received regarding building blocks, containing
high-powered magnets, purchased from an online marketplace. The sides of the
blocks came apart and exposed small, powerful magnets. The parent who
submitted the complaint item had bought the toy for her young son and was
concerned about the safety risk. The social media platform which sold the product
responded positively and, within 24 hours of our request for test certification,
removed the offending product line along with 46 similar listings. Shortly afterwards,
a newspaper reported an incident involving a comparable product in which a young
child required attendance at A&E after swallowing tiny magnets from a similar toy.
It was subsequently identified that almost 7,000 of the products had been sold.
Consumers were notified that the product posed a serious risk that if the magnets
were ingested, they could cause a block in the intestine. Copy of the product safety
alert linking to the recall notice is provided in appendix 4. 
• Non‑compliant imported construction products – this case was referred to the
team from the National Ports and Borders team and involved a North Lanarkshire
importer of incorrectly labelled plastic flooring. The product lacked the required
Declaration of Performance and associated technical documentation. Following
engagement, the importer agreed not to place the product on the market and
arranged for the goods to be destroyed. 
Page 10 of 228

Page 11

• Children’s nightlight – A complaint was received that a child appealing Pokémon
Pikachu night light, bought from an online marketplace, was found to have an easily
accessible button battery compartment. If a child accesses and ingests a button
battery, it can cause life threatening internal burns within hours and this harm has
been linked to severe injuries and child fatalities in the UK, including in North
Lanarkshire. Our investigation resulted in the product being withdrawn from the
market and consumers informed. Copy of the product safety alert linking to the
recall notice is provided appendix 5. 
• Costume Jewellery project – Officers identified unsafe costume jewellery
products in two national retailers and one local retailer. Voluntary sign over for
destruction was obtained from the local retailer and the information on the national
retailer failures was passed to the relevant Primary Authority for appropriate action
to remove the risk to consumers. 
• Tanning Accelerators and Teeth Whiteners Project. 6 businesses were
inspected, with 24 cosmetic products assessed for compliance. Varying levels of
compliance were identified, with one business referred to its Home Authority for
support and one ongoing investigation relating to the safety of products suspected
of containing hydrogen peroxide above legal (safe) limits. 
• Electrical Chargers Project. Across 20 premises, 58 chargers were inspected,
with two found to be non-compliant. Although compliance levels were generally
good, issues with documentation and marking highlight the need for continued
monitoring and business engagement. 
• Second-hand goods project - Officers inspected more than 1,000 items across
local retailers, identifying non-compliant electrical goods, toys and clothing. This
included PAT test failures on electrical goods, toys with no evidence of compliance,
and children’s clothing with hazardous cords. 1 retailer removed 20 second-hand
TVs from sale following advice. The project revealed that most retailers were
unaware of their product recall obligations or relevant safety standards, underlining
the importance of continued business education and market surveillance. 
2.11 As illustrated above, our community education initiatives have highlighted that many
consumers assume products must be safe if they are available to buy. Enforcement
activity clearly demonstrates that this is not always the case, particularly with the rise
in online shopping where regulatory oversight is limited. Strengthening and expanding
consumer safety and education is therefore essential to better protect residents and
ensure communities are equipped to identify unsafe or non-compliant products. 
3. Measures of success 
3.1 This ongoing regulatory advice, enforcement and educational activity strengthened
consumer product safety awareness among online sellers and led to positive changes
in trading practices. 
3.2 The footfall at each public event and feedback sought through a questionnaire was
monitored after each event to identify any areas that required to be modified to meet
our objectives. 
Page 11 of 228

Page 12

3.3 14 consumer product safety events were delivered in areas with child poverty rates of
between 26% and 33% which is above the Scottish average of 24%1. The average
rating of knowledge of high-risk hazards before attending the awareness event was at
an average of 6.69 out of 10. After engaging with our consumer education initiative,
confidence in identifying unsafe second-hand goods rose to an average of 8.88 out of
10. A total of 98% of participants reported maintained or improved confidence. 75% of
participants showed a measurable increase in their knowledge of consumer product
safety issues.  
3.3 Our enforcement interventions led to more than 56 product lines and tens of thousands
of unsafe products being withdrawn from the market. 
4. Supporting documentation 
Appendix 1 – Second-Hand Goods Education Initiative 
Appendix 2 – Events attended during the Second-Hand Goods Education Initiative (and
indicative footfall at stalls) 
Appendix 3 – Product Safety Amnesty Poster 
Appendix 4 – Product Safety Report, Building Blocks 
Appendix 5 – Product Safety Report, children’s night light 
Lyall Rennie
Chief Officer (Community Operations) 
1 North Lanarkshire Local Child Poverty Action Report 2023-2024
Page 12 of 228

Page 13

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Page 13 of 228

Page 14

Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The report contains links to the council website containing short awareness raising
clips, information shared through the council’s social media platforms and a request
for support of any future communications on product safety initiatives. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles
from the United Nations Convention on the Rights of the Child (UNCRC). 
These initiatives support the safety and wellbeing of children by raising awareness
of known product risks and preventing harm within households. As the report does
not introduce new policy or service decisions affecting children or young people, a
formal Children’s Rights and Wellbeing Impact Assessment is not required. 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒
Page 14 of 228

Page 15

Appendix 1 – Second-Hand Goods Education Initiative 
Page 15 of 228

Page 16

Appendix 2 - Events attended during the Second-Hand Goods Education Initiative (and
indicative footfall at stalls)
Event Area Date Footfall
Too Good to Throw Wishaw 30 August 2025 250
Car Boot Sale Bellshill 20 September 2025 200
Jack n Jill Baby Market Ravenscraig 13 August 2025 250
Coatbridge College Coatbridge 10 November 2025 150
Food Bank Airdrie 14 November 2025 30
Food Bank Wishaw 25 November 2025 60
Cumbernauld College,
Foodbank
Cumbernauld 10 November 2025 150
Christmas Fayre Airdrie 6 December 2025 250
Foodbank/Christmas Fayre Wishaw 16 December 2025 200
Buchanan Centre Coatbridge 2 February 2026 100
Bellshill Cultural Centre Bellshill 29 January 2026 150
Antonine Centre Cumbernauld 3 March 110
Forgewood Housing 
Co-Operative
Motherwell 30 March 2026 TBC
Foodbank Motherwell 2 April 2026 TBC
Total footfall to date – 1,900  
Page 16 of 228

Page 17

Appendix 3 – Product Safety Amnesty poster 
Page 17 of 228

Page 18

Appendix 4 – Product Safety Report, Building Blocks 
Page 18 of 228

Page 19

Appendix 5 – Product Safety Report, children’s night light 
Page 19 of 228

Page 20

Page 20 of 228

Page 21

North Lanarkshire Council
Report
Environment & Climate Change Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    SW/LR Date 29/04/26 
Development of an Action Plan for Graffiti 
From  Lyall Rennie, Chief Officer (Community Operations)  
E-mail renniely@northlan.gov.uk   
Executive Summary 
Graffiti is increasingly visible across North Lanarkshire’s road network, particularly on street
furniture maintained by Community Operations and control cabinets owned by public utility
companies. This form of vandalism contributes to public safety concerns and a perception
of neglect in local communities. 
North Lanarkshire Council currently manages graffiti removal on its own assets, prioritising
removal of offensive content, but does not oversee or coordinate with other responsible
organisations. 
This initiative aims to enhance accountability and responsiveness of public utilities with
regards to graffiti removal. 
Recommendations
It is recommended that the Environment and Climate Change Committee: 
(1) Approve the establishment of a multi‑agency officer working group to address
graffiti across North Lanarkshire; and 
(2) Approves the proposal to write to relevant organisations including Police Scotland,
statutory undertakers, neighbouring local authorities, Motherwell Football Club,
Glasgow Celtic Football Club and Glasgow Rangers Football Club to seek support.
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (17) Ensure we keep our environment clean, safe, and attractive
Programme of Work Transforming Places
Page 21 of 228

Page 22

1. Background 
1.1 Graffiti is a form of vandalism that damages property, causes public safety issues and
can result in a sense of neglect. It negatively impacts local neighbourhoods by making
public spaces appear unsafe. 
1.2 The Council is responsible for removing graffiti from Council owned buildings and
property. Removal of graffiti from other buildings and property is the responsibility of
the property owners. 
1.3 The Council has the power to take enforcement action against perpetrators of graffiti
where there is enough evidence to do so under the Antisocial Behaviour etc. (Scotland)
Act 2004.   
2. Report 
2.1 Community Operations has an established procedure for removing graffiti from Council
owned buildings and assets, with response times determined by whether the graffiti is
classified as offensive or non-offensive.   
2.2 The Service responds to reports submitted via the Customer Hub or the Council’s
website. At present, only graffiti affecting North Lanarkshire Council–owned property is
recorded within our asset management systems and subsequently actioned. In
addition, Community Operations deploy crews who proactively identify, report, and
remove graffiti on Council-owned land and assets. These proactive interventions are
also captured within the figures presented in Table 1 below. 
2.3 Customers reporting graffiti on private property and control cabinets owned by public
utilities are advised to contact the relevant owner directly. These reports are not
recorded by the Council and therefore we do not hold data on the scale of graffiti
affecting private assets. 
2.4 The numbers of graffiti related reports to the Council is shown in Table 1 below. A
further 238 calls were received for graffiti on assets that were not maintained by the
Council. 
Table 1 – Numbers of Enquiries in Relation to Graffiti
Year Offensive Racist Sectarian Other Total
2023 227 26 144 641 1038
2024 384 49 193 495 1121
2025 277 108 196 583 1164
2026 
1st Quarter
54 11 105 140 310 
2.5 Emerging anecdotal evidence indicates a noticeable rise in sectarian and
football‑related graffiti, likely linked to the unusually competitive nature of the current
Premier League season. A significant number of images are now circulating that
document this increase. This type of graffiti has a negative impact on local
communities, contributing to a sense of division, reducing feelings of safety and
undermining the overall appearance of neighbourhoods. 
2.6 Simply cleaning graffiti each time it is reported does not address the underlying
behaviours that cause repeat incidents, particularly where markings are intended to
Page 22 of 228

Page 23

provoke tensions. These types of graffiti often reappear quickly after removal, creating
a cycle of reactive work that absorbs significant staff time without achieving a lasting
improvement in the local environment. While prompt removal is important, it does not
deter individuals who are motivated by rivalry, territory-marking, or the desire for
visibility. Without a wider approach including prevention and community engagement,
enforcement the problem simply resurfaces. 
2.7 The financial and operational implications of this cycle are substantial. Each call-out
requires staff, vehicles, cleaning materials and, in some cases, specialist equipment or
protective coatings. Over time, repeated visits to the same locations place pressure on
already limited resources and divert crews away from other essential maintenance
tasks. This reactive model is not sustainable, especially as costs continue to rise. A
more strategic and proactive approach is therefore necessary to reduce recurrence and
ensure that resources are used efficiently. 
Other Private Property 
2.8 North Lanarkshire Council does not routinely remove graffiti from privately owned
property. This is because undertaking such work could expose the Council to the risk
of causing accidental damage to the property during the removal process. As liability
for any such damage would rest with the Council, it is not considered appropriate to
carry out graffiti removal on property that is not under Council ownership or control.
Property owners are therefore responsible for arranging the removal of graffiti from their
own premises. 
Public Utility Apparatus 
2.9 The level of graffiti and in particular ‘tagging’ on street furniture appears to be increasing
significantly. This activity is visible on street furniture and particularly control cabinets,
the majority of which are owned and managed by public utility companies (water, gas,
electricity, telecoms). 
2.10 Public utility companies (e.g., water, gas, electricity, telecoms) have statutory rights
under the New Roads and the Street Works Act 1991 to place, inspect, maintain, adjust,
repair, alter, change position or renew apparatus within the Public Road network. 
2.11 The Transport (Scotland) Acts of 2005 and 2019, form the primary legislation governing
the rights of statutory undertakers in Scotland. Although this legislation covers the
safety and maintenance of apparatus and the road structure, it does not place any duty
on utilities to remove graffiti. 
2.12 Roads authorities are responsible for ensuring the safety of the road network through
routine, planned inspections. These inspections do not include recording or reporting
graffiti. Most utilities do not carry out scheduled inspections of the visual condition of
their own apparatus. 
2.13 The Service met with major utility providers in 2024 following concerns about
widespread graffiti on control cabinets. Utilities confirmed they have procedures to
respond to reports of offensive graffiti when notified. Many control cabinets appear
similar and lack identifying information, making ownership difficult to determine.
Guidance is provided on the Council website to assist customers in identifying the
responsible utility. 
2.14 Feedback indicates that graffiti is not being removed consistently, although the Service
cannot confirm whether residents are reporting incidents to utilities. A review of practice
Page 23 of 228

Page 24

in other Scottish authorities indicates that utilities generally respond to graffiti reports
promptly and reasonably. 
2.15 Many of the utility control cabinets contain expensive technology that supports the
provision of key services to local communities and businesses. Some cabinets have
vents to prevent the technology overheating. Hence there may be a significant risk of
damage if this Service were to undertake to remove such graffiti. 
Legislation 
2.16 The Antisocial Behaviour etc. (Scotland) Act 2004 (the 2004 Act), empowers local
authorities to serve a ‘graffiti removal notice’ on a person responsible for a relevant
surface in that local authority’s area where that surface has been defaced by graffiti
and that graffiti is either offensive or detrimental to the amenity of the locality requiring
them to remove the graffiti within a specified time of at least 28 days. 
2.17 The legislation also allows that where a person fails to comply with a graffiti removal
notice, the local authority may remove the graffiti from the property themselves, may
enter any land reasonably necessary for that purpose and may recover any costs
incurred in doing so from the person on whom the graffiti removal notice was served. 
Action 
2.18 Community Operations aims to establish a coordinated, multiagency approach that
brings together Police Scotland, public utility providers, community organisations,
education partners and the Council. This partnership would focus on tackling the issue
through a balanced programme of education and enforcement. 
2.19 Delivering this approach will require support from colleagues across Communications,
Education, the Community Partnership Team and other relevant services to ensure full
coordination and consistency. 
2.20 In light of the current challenges, the Service proposes to engage directly with
Motherwell Football Club, Celtic Football Club and Rangers Football Club to seek their
cooperation and support. 
2.21 North Lanarkshire will continue to respond to reports of graffiti on Council‑owned
assets. A proactive approach will be adopted to address tagging on street‑lighting
control cabinets, setting a positive example. 
2.22 Rising levels of graffiti are not unique to North Lanarkshire and are regularly
encountered across many communities throughout the West of Scotland. Sectarian
and football‑related markings are part of a wider regional issue, and their persistence
highlights the need for a collaborative response rather than isolated local action. For
this reason, we intend to explore opportunities to work with neighbouring local
authorities to share good practice, coordinate approaches, and develop joint strategies
that can more effectively deter repeat incidents and reduce the resources required to
address them. 
3. Measures of success 
3.1  The Service can ensure that reports of graffiti are reported to the correct organisation
and the visual appearance of street furniture and subsequently our communities. 
Page 24 of 228

Page 25

3.2 Development of a coordinated, multi‑agency approach to address this issue through a
combination of education and enforcement. 
4. Supporting documentation 
N/A 
Lyall Rennie
Chief Officer (Community Operations) 
Page 25 of 228

Page 26

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data? 
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 26 of 228

Page 27

Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 27 of 228

Page 28

Page 28 of 228

Page 29

North Lanarkshire Council
Report
Environment and Climate Change Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref     LR/VA/HA Date 29/04/26 
Dumbreck Local Nature Reserve: Bringing Life to Heritage 
From  Lyall Rennie – Chief Officer, Community Operations  
E-mail renniely@northlan.gov.uk   
Executive Summary
The purpose of this report is to provide committee with an overview of the successful
completion of phase 2 of the Dumbreck & Garrell Burn Project. The report provides a
summary of works delivered on site, community participation, and the future of the site. 
In order to satisfy the terms of the National Heritage Lottery Fund grant, five approved
purposes and outcomes were identified for delivery during the project. 
• Recruit a project officer. 
• Recruit 25 community volunteers from a range of backgrounds and provide appropriate
conservation training.
• Support the establishment of a volunteer conservation management group for the
nature reserve.
• Engage the community through a series of events, training workshops, and oral history
interviews.
• Consult with the community to inform the design of interpretation and sculpture. 
All purposes and outcomes were achieved, with the grant successfully claimed on time. 
Recommendations
It is recommended that the Environment and Climate Change Committee: 
(1) Acknowledge the success of the project. 
(2) Consider the legacy of the project through the continued work of the conservation
volunteer group.  
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (15) Encourage the health and wellbeing of people through a range
of social, cultural, and leisure activities
Programme of Work Sustainable Futures
Page 29 of 228

Page 30

1. Background 
1.1 Dumbreck Marsh Local Nature Reserve is an area of open countryside covering an
area of approximately 72 hectares with the Garrell Burn running through it, the LNR is
located in the centre of Kilsyth, North Lanarkshire. 
1.2 The previously industrialised brownfield site was awarded funding through the Water
Environment Fund (WEF), and North Lanarkshire Council (NLC) and in 2022, in
partnership with Scottish Environment Agency (SEPA) and the Centre for River
Restoration phase 1 of the site transformation was completed.  Full details on the
enhancements that took place were reported to the Environment & Place Committee in
August 2022 
1.3 Building on the success of phase 1, Community Greenspace applied for and gained
funding (£110,255) from the National Lottery Heritage Fund (NLHF) to undertake phase
2 between April 2023 and November 2025, which focused on community engagement
and involvement.   Transformation of the site continued, and Dumbreck now provides
a destination to attract more visitors to a high quality greenspace, rich in stories of its
history and providing a haven for its wildlife. 
2. Report 
2.1 Historically the land at Dumbreck was used for farming and to a lesser extent weaving.
However, the main activities on the land in the mid / late 20th century were linked to
mining. Old mineral railways lines, bing mounds, coke and coal waste and alterations
to the water channel were evident across the whole site. 
2.2 Following the closure of the colliery the site was abandoned and left to nature. Owing
to its unique environment with its variety of habitats including large areas of grasslands,
woodlands, running water and ponds, the site was recognised for its local importance
and was designated as a Local Nature Reserve (LNR) in 1996 for its valuable wetland
habitats.  
2.3 Phase 2 of the project identified 3 main themes: Environment, Heritage, and
Community.  A series of interlinked projects were developed to continue improvements
to the environment and to inform residents about the heritage of the site. Delivery of all
the initiatives relied upon involvement, engagement, and participation of the local
community. 
Environment 
2.4 Dumbreck Marsh LNR is a unique and special place with the marsh habitat playing a
key feature, providing natural water retention properties during flooding conditions.
Marshes are wetland habitats with water saturated soil and emergent vegetation like
grasses and reeds and are highly productive ecosystems that provide habitats for a
variety of wildlife and birds. 
2.5 Dumbreck has a mosaic network of habitats across the site from the marsh vegetated
areas, the water environments, forest & woodland sites along with species rich
meadows. 
Page 30 of 228

Page 31

2.6 To maintain these valuable habitats and encourage species diversity requires ongoing
active management.  Woodland, grassland and general reserve management projects
were identified for the conservation group to undertake.  Hedgerows of Alder, Willow,
Hawthorn, Hazel, Dogwood and Blackthorn were planted across the site and coppicing
and thinning practices were undertaken. The open grassland had been naturally
colonised by Broom which was taking water from the ground and degrading the habitat. 
Hand removal of Broom and planting of native wildflowers including Cowslip, Bluebells,
Snowdrops, Daffodils, Wood Anemone, Primrose, Lesser Celandine and Marsh Violet
was completed during 2025. 
2.7 The water environment was given a further boost by the removal of culverts. Allowing
free movement of water will keep the marsh wetted and improve this threatened habitat
for the future. 
2.8 Some specific habitat improvements (wetland scrapes and replenishing the sand martin
wall) were carried out to benefit particular species including Sand Martin and Lapwing. 
Heritage 
2.9 Dumbreck Marsh is practically unrecognisable from what the site looked like 50+ years
ago. The cultural and natural heritage at Dumbreck is everywhere in the landscape
although knowledge of its history was not widely known. 
2.10 An intergenerational initiative working with younger residents from local schools and
groups, together with older residents, captured memories, stories of the site in the past
and also heard about local people’s current experiences of the site and what they hope
it will be like in the future.  Working with a small production company, a short film called
Bringing History to Life at Dumbreck – Past, Present & Future was created and can be
viewed here. https://vimeo.com/1157237916?share=copy&fl=sv&fe=ci 
2.11 During the making of the film a huge amount of research materials were accumulated
about the site. The company were also simultaneously working on another local project
and brought to our attention work on the Eco-Museum of Scottish Mining Landscapes
which is a comprehensive archive of mining heritage across the central belt of Scotland. 
Our funders allowed us to expand the original remit of our project to develop a physical
and virtual heritage trail using the research materials to create interpretation lecterns
and also to upload the virtual trail to the Eco-Museum of Scottish Mining Landscape
site. Mining Landscapes.  Examples of the interpretation lecterns have been included
in appendix 2. 
Community Involvement 
2.12  One of the main elements of the community theme was the creation of a bespoke art
work to celebrate the successful return of Salmon to the Garrell Burn, which was made
possible by the first phase of the Dumbreck & Garrell project. 
2.13 Working with a small company who have previously worked in the local area; outdoor
sessions with children from local primary schools and the high school were arranged,
along with evening sessions with the guides and scouts. Their drawing, collage
pictures, and Cyanotype printing artwork informed the design of the Salmon Sculpture. 
2.14 The Salmon Sculpture comprises 8 individual Corten Steel panels. Each one is unique
and includes elements of the landscape, plants, animals, birds, fish, and
macroinvertebrate life found in the burn. 
Page 31 of 228

Page 32

2.15 A further output of this community theme was the formation of the Conservation Group. 
Set up during the early stages of the project with a few individuals, the number of
volunteers continued to grow throughout the project and is now a healthy group of 12. 
Originally the group received Project Officer support but is now aligned under the
Kilsyth Community Council and continue to meet fortnightly. 
2.16 The Conservation Group volunteers have also taken part in several workshops and
training sessions. They have learned about Riverfly monitoring, Dragonfly and
Damselfly survey techniques and have gained woodworking skills and been trained in
the use of mini diggers, strimmer equipment, invasive species control and removal
methods. The group are hugely important as they are well equipped and skilled to
continue to take on general habitat and species conservation management tasks on
site. 
2.17 The continued work being carried out by the Conservation Group provides ongoing
maintenance on site. It also provides opportunities for local people to volunteer and
give back to their community fostering a sense of pride in their area and benefiting from
having a high quality greenspace on their doorstep.  Over the whole project there was
just under 500 hrs of volunteer participation on site. 
2.18 During the project students and their support workers from New College Lanarkshire
were also welcomed to the site. The students are attending college to help them with
gaining employment and volunteering outside is an important part of their course.  Many
of the students were not familiar with using hand tools, working outside, or carrying out
any practical conservation activities but they learned new skills including painting,
sanding down wood, clearing vegetation, using hand tools and also hedgerow planting. 
Under the supervision and guidance of the Project Officer the students visibly grew in
confidence and capability. 
2.19 Throughout the project the local community were offered many opportunities to be
involved through practical tasks, events and volunteering. Through direct feedback it
was highlighted that visitors needed resting places and would appreciate repairs and
path works to be delivered, which has subsequently been implemented.  
2.20 Encouraging visitors to the town was also important and as a result 4 large signs were
installed at key entrance points to the site. These standardised signs make it easy to
navigate around the site; each one has a ‘You Are Here’ starting point depending on
where you enter.  A printed leaflet was also designed for visitors to the site to enable
clear wayfinding. 
2.21 To complement the new signs, a stonemason also created two beautiful stone walls at
the Garrell Road and Gavell Road entrances. 
3. Measures of success  
3.1 The Countryside Ranger Service will continue to monitor this site’s important habitats
and species through regular site stewardship visits. 
3.2 Volunteer hours will continue to be included in the service KPIs. 
Page 32 of 228

Page 33

4. Supporting documentation 
4.1 Appendix 1 - Environment theme pictures 
4.2  Appendix 2 - Heritage theme pictures
4.3 Appendix 3 - Community theme pictures 
Lyall Rennie 
Chief Officer, Community Operations 
Page 33 of 228

Page 34

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒   
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒  
Adopting the reviewed Core Paths Plan will ensure the council continues to fulfil its
statutory duties under the Land Reform (Scotland) Act 2023. 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data? 
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐
Page 34 of 228

Page 35

If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
There has been a positive environmental impact through improving habitats,
building nature networks and preserving the path network to offer the opportunity
for active travel choices. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒  
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
Page 35 of 228

Page 36

If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 36 of 228

Page 37

Appendix 1 – Images of the Environment Theme 
Page 37 of 228

Page 38

Appendix 2 – Images of the Heritage Theme 
Page 38 of 228

Page 39

Appendix 3 – Images of the Community Theme 
Page 39 of 228

Page 40

Page 40 of 228

Page 41

North Lanarkshire Council
Report
Environment & Climate Change 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    LR/HL Date 29/04/26 
Redevelopment of Colzium House, Kilsyth 
From  Lyall Rennie, Chief Officer (Community Operations)  
E-mail liddleh@northlan.gov.uk   
Executive Summary 
This report provides an update on work recently undertaken to begin redevelopment of
Colzium House, outlining future plans, stakeholder engagement and potential funding
options for further consideration.  
Recommendations 
It is recommended that the Environment and Climate Change Committee: 
1) Acknowledge the work undertaken to date at Colzium House, Kilsyth and future
development plans. 
2) Otherwise, acknowledge the contents of the report. 
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement
(16) Transform our natural environment to support wellbeing and
inward investment and enhance it for current and future
generations
Programme of Work Statutory / corporate / service requirement
Page 41 of 228

Page 42

1. Background 
1.1 Colzium House sits within the Colzium Lennox Estate on the northeast edge of Kilsyth.
Its history spans centuries, from medieval land grants to Jacobite upheaval and
modern community use.  Colzium House is a category B listed building which sits within
wider estates featuring gardens, woodland walks, the Clock Theatre café, the castle
ruins, and historic landscape elements. 
1.2 Previously operated as a community facility, Colzium has been used as a wedding
venue and meeting space for local groups.  Over lockdown and subsequently, wedding
bookings have reduced.  The Friends of Colzium are a volunteer group associated with
Colzium House and Estate in Kilsyth, whose primary role is to support public
engagement with the site’s history and heritage.  They continue to make use of the
house and gardens. 
1.3 In 2024, the management of Colzium House transferred from Community Facilities to
Active & Creative Communities.  This report outlines the work undertaken to date and
with the recent approval of £820,000 in capital funding for 2026/27, gives an overview
of our plans for further development. 
2. Report 
Phase One 
2.1 Phase one of the restoration was supported by capital funds held by Active & Creative
Communities.  This included restoration of the main Ground Floor Function Rooms and
the Courtyard - both now successfully complete and open for use. These works have
removed outdated additions to reveal the building's authentic historic character,
creating a sophisticated environment for local community groups, clubs, weddings and
corporate events and meetings.  Works undertaken include: 
● Ceiling Restoration: Dated finishes, including Artex, were removed and
replaced with smooth, traditional plasterwork to restore original ceiling profiles.
● Ornamental Plasterwork: New decorative ceiling roses and matching period
cornices were professionally installed to reinstate the rooms' original elegance.
● Heritage Wall Treatments: The rooms now feature custom timber wall
panelling and high-quality artistic wallpapers to provide a premier and elegant
setting.
● Fireplace Conservation: Original fireplaces were uncovered and restored,
with the addition of period-style corbel details and decorative tiling as focal
points.
● Courtyard Improvements: The courtyard was transformed from a neglected
space into a safe, versatile outdoor asset with new composite decking and
lighting. 
2.2 The total investment to date is £125,000. This expenditure has successfully returned
the primary Function Rooms and Courtyard to high-quality use, providing a significant
return in terms of building preservation and community value.  We have also worked
with colleagues to install public WIFI throughout the venue. 
Page 42 of 228

Page 43

Phase Two 
2.3 With new capital funding secured, phase two of the project will focus on making the
building fully accessible and restoring key hospitality facilities. These phases are
designed to protect the building’s historic value while maximising commercial
opportunities and community access. Scheduled to begin in September 2026, this
focuses on the main entrance and guest suites to solidify the building's position as a
premier wedding and event destination.
● Reception and Entrance: Woodwork will be restored and a new solid Douglas
Fir entrance door installed featuring a bespoke etched ‘peacock’ design to
provide a grand arrival for guests.
● Bridal Suite: Will be finished with premium Muraspec Carmen wallcoverings
and durable Axminster carpeting to meet the standards of a high-end venue.
● Improved Access: The ground floor corridor will be updated with two new
doors leading to the courtyard to improve guest circulation during large events.
Page 43 of 228

Page 44

● Community Gallery: Corridor walls will be converted into a dedicated
exhibition space, providing a platform for local community art and photography
groups. 
Phase Three 
2.4 Phase Three is Perhaps the largest and most challenging part of all the phases, this
structural project will bring back the grand scale of the main event and hospitality
space, making it incredibly versatile to host large-scale community meetings and civic
events.
● Revealing the original roof structure: Modern grid ceilings will be removed
to expose the original roof structure, supported by new structural Oak beams.
● Grand Lighting: The hall will feature three large, tiered ring chandeliers and
modern architectural lighting to create a flagship space for weddings and other
events. 
Phase Four 
2.5 Phase Four will be the last to be delivered as it will be subject to available funding. It
will set out to create a high-end social and hospitality events space to provide a new
source of income for the house, ensuring its long-term viability as a community asset. 
• Hospitality Features: A professional bar with illuminated displays and curved
mirrors will be installed to support commercial event opportunities.
• Premium Materials: The bar will use high-quality stone and walnut finishes to
ensure durability for frequent community and private use. 
Phase Five 
2.6 Phase 5 represents a major capital commitment to making Colzium House inclusive
for everyone, particularly local clubs, schools and visitors with mobility requirements.
Page 44 of 228

Page 45

This phase will create a new, purpose-built museum area by converting the old
adjoining, currently derelict, flat into a high-specification cultural space.
2.7 The conversion of the old flat will see the space converted into new museum provision
is an important offering that will properly showcase the history of Kilsyth. It will feature
the ability to display key artifacts and offer educational storytelling regarding significant
local events, such as the Battle of Kilsyth.
● Improved Access: A new accessible ramp will be built from the upper carpark to
ensure barrier-free access, inviting more people to explore the estate's heritage.
This new, dedicated separate entrance will be created for the first floor to serve the
museum and also the house for the community and school groups more effectively.
● Educational Display: The area will be reconfigured with new display plinths and
shallow-framed panels designed to narrate Kilsyth’s history including the events of
the Battle of Kilsyth. 
2.8 In recognition of the recent council funding provision of £820,000 to support plans as
outlined, the council is also exploring opportunities for external funding.  We recognise
that further funding will be required to achieve all plans as outlined. Linking with
ongoing projects in Airdrie and Summerlee, the council has strong relationships with
both Historic Environment Scotland and the Heritage Lottery Fund.  We are now in
initial stages of discussion about potential opportunities which may provide opportunity
to protect, enhance and promote our historic environment.   
2.9 Finally, in continuing to make improvements within the House, we have been engaging
with community representatives, most notably the Friends of Colzium.  The group
continue to undertake environmental clean ups throughout the estate and are keen to
work with the council as redevelopment continues. 
3. Measures of success 
3.1 Restoration of a key historical venue, repurposing the facility for future generations. 
4. Supporting documentation 
N/A 
Lyall Rennie
Chief Officer (Community Operations) 
Page 45 of 228

Page 46

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
We continue to manage all budgets to ensure we are able to support ongoing
works.  We are exploring additional external funding opportunities.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒
Page 46 of 228

Page 47

If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 47 of 228

Page 48

Page 48 of 228

Page 49

North Lanarkshire Council
Report
Environment & Climate Change 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    JMcE / LR Date 29/04/26 
Fleet Asset Management Plan 2026 – 2035 
From  Lyall Rennie, Chief Officer (Community Operations)  
E-mail renniely@northlan.gov.uk   
Executive Summary 
The Fleet Asset Management Plan (FAMP) sets out how the Council manages its vehicle
and plant assets to support delivery of the Council’s Ambition Programme 2026–2035 and
seeks Committee approval for its adoption. The Plan provides an overview of the
management of the fleet asset base and demonstrates how it is aligned with the Council’s
strategic objectives, ensuring that fleet assets are effectively planned, maintained, and
renewed to meet both current operational needs and future service requirements in a
sustainable and cost-effective manner. 
Recommendations 
It is recommended that the Environment & Climate Change Committee: 
(1) Approve the Fleet Asset Management Plan.
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (22) Facilitate a North Lanarkshire wide approach to asset
rationalisation, including with communities and partners
Programme of Work Sustainable Futures
Page 49 of 228

Page 50

1. Background 
1.1 The Council is committed to the preparation of a Fleet Asset Management Plan that
establishes a consistent and strategic approach to asset management across the
organisation. Aligning with the Plan for North Lanarkshire and the Corporate Asset
Management Plant, the Plan ensures that investment in assets, is planned, prioritised,
and delivered in line with the Council’s longer term objectives and five-year Capital
Investment Programme. 
2. Report 
2.1 The overall aim of Fleet Asset Management Plan is to maintain and improve the
condition suitability and utilisation of assets in terms of service delivery and best value. 
2.2  The FAMP details the strategic objectives and how we manage our asset base and
ensure our Fleet assets meet current and future operational needs and aspirations of
the Council. 
2.3 A key focus of current targets is the decarbonisation of the fleet, which is one of the
largest contributors to emissions. This includes promoting the uptake of alternatively
fuelled vehicles and developing the necessary infrastructure to support their use. 
2.4 This is an opportunity for NLC Fleet Services to promote innovation whilst challenging
existing practices to improve fleet utilisation. Within such a high profile, highly technical
and heavily regulated area, it is forecast that several alterations to current practice will
become evident over the next five years. These areas may be driven by operational
practices, central government initiatives, good practice, legislation, or environmental
concerns. 
3. Measures of success 
3.1 Fleet KPI success. 
3.2 Fleet Vehicle Replacement Program spend. 
3.3 Maintaining highly trained and qualified workforce capable of meeting the challenges
of innovative and emerging technologies. 
4. Supporting documentation 
Appendix 1 Fleet Asset Management Plan 
Lyall Rennie
Chief Officer (Community Operations) 
Page 50 of 228

Page 51

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
Capital VRP budget in place and will be aligned to this project 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒
Page 51 of 228

Page 52

If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Aligned to Scottish government climate change policy 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 52 of 228

Page 53

N
FLEET ASSET MANAGEMENT
PLAN – 2026 TO 2035 
Page 53 of 228

Page 54

Fleet Asset Management Plan – 2026 to 2035  2
Document control
Title Fleet Asset Management Plan
Owner John McElhinney Contact McElhinneyJ@northlan.gov.uk 
Governance Group Finance and Resources 
Author John McElhinney Contact McElhinneyJ@northlan.gov.uk 
Revision History
Number Originator Date Review Commenced Revision description/record of change             
Document Approvals
Number Governance
Group
Date approval granted Date approval to be requested 
(if document still draft)
01 Finance and
Resources           
Consultation Record (for most recent update)
Status of document consulted upon 
Stakeholders consulted/date 
Strategic Alignment 
Next review date
Review Date 
Page 54 of 228

Page 55

Fleet Asset Management Plan – 2026 to 2035  3
Contents  
Executive Summary ............................................................................................................................... 5
North Lanarkshire 5 Strategic Priorities  ............................................................................................... 6
Introduction .......................................................................................................................................... 7
Corporate Fleet Management .............................................................................................................. 7
Current Fleet ......................................................................................................................................... 7
Current Fleet Vehicle Types .................................................................................................................. 8
Maintenance of Fleet ............................................................................................................................ 8
Workshop Vehicle Frequency ............................................................................................................... 8
Workshop Staffing ................................................................................................................................ 9
Corporate Objectives for Fleet............................................................................................................ 10
Aims for Fleet ...................................................................................................................................... 10
Operator Licence Undertakings .......................................................................................................... 11
Carbon Emission Reduction ................................................................................................................ 12
Fleet Performance .............................................................................................................................. 13
Page 55 of 228

Page 56

Fleet Asset Management Plan – 2026 to 2035  4
Fleet Performance Systems ................................................................................................................ 14
Future Fleet Governance and Structure ............................................................................................. 15
Ownership of Fleet Asset Management Plan ..................................................................................... 16
Operational Challenges ....................................................................................................................... 17
Procurement ....................................................................................................................................... 17
Future needs and Challenges .............................................................................................................. 18 
Page 56 of 228

Page 57

Fleet Asset Management Plan – 2026 to 2035  5
Executive Summary 
The Fleet Asset Management Plan (FAMP) covers the period 2026–2035 and sets out
the policy framework for managing the Council’s fleet. It provides an overview of the
scope, purpose, and current activities of our fleet operations, while identifying future
actions and potential risks. The plan supports the delivery of a well-managed,
environmentally responsible fleet that meets operational needs both now and in the
future. 
The plan is fully aligned with the overarching North Lanarkshire Council Plan, ensuring
a clear connection to the council’s strategic aims, objectives, and priority outcomes. 
aligned with the overarching North Lanarkshire Council Plan which in turn is aligned
to council aim, objectives and delivery of priorities. 
Page 57 of 228

Page 58

Fleet Asset Management Plan – 2026 to 2035  6
North Lanarkshire - 5 Strategic Priorities 
This Asset Management Plan delivers benefits across all 5 strategic Priorities: 
1. Improve economic opportunities and outcomes 
2. Support all children and young people to realise their full potential 
3. Improve the health and wellbeing of our communities
4. Enhance participation, capacity and empowerment across our communities
5. Improve North Lanarkshire’s resource base 
Page 58 of 228

Page 59

Fleet Asset Management Plan – 2026 to 2035  7
Introduction
The Fleet Asset Management Plan (FAMP) forms part of a suite of strategic documents that collectively define, guide, and enhance the management of
the Council’s assets. Developed in alignment with the Council’s Corporate Plan, it outlines North Lanarkshire’s aims and objectives for our fleet assets,
ensuring they are managed effectively, efficiently, and in a way that supports the delivery of high‑quality services.
Corporate Fleet Management
The corporate management of the Council’s fleet asset portfolio plays a critical role in supporting the Council’s Transformation Agenda and will
encompass the following areas: 
1. Providing oversight of day‑to‑day fleet operations, including the maintenance and repair of existing fleet assets
2. Strengthening investment decision‑making to ensure fleet developments align with the Council’s wider strategic objectives
3. Procuring new fleet assets that are appropriately specified, well‑designed, and fully aligned with service requirements
4. Reducing overall cost and risk through effective planning, governance, and operational control
5. Identifying surplus fleet assets and managing their disposal in a timely and efficient manner
6. Ensuring effective management of fleet‑related leases, licences, and associated contractual arrangements
7. Maximising the utilisation, efficiency, and effectiveness of the Council’s fleet assets across all departments 
Page 59 of 228

Page 60

Fleet Asset Management Plan – 2026 to 2035  8
Our Current Fleet 
North Lanarkshire Council’s fleet currently comprises of 703 core vehicles, representing a substantial operational asset that supports the delivery of
essential Council services. Effective management of this fleet is vital to ensuring legal compliance, service reliability, and the long-term sustainability of
the asset base. 
The primary service users include: 
1. Land and Waste – Recycling and refuse collection vehicles, street‑cleansing and sweeping equipment, specialist loading and lifting equipment,
light and heavy commercial vans, grass‑cutting machinery, and tractors
2. Education Transport – Vehicles used for the transportation of ASN and mainstream pupils to and from school
3. Education & Families – Justice Services vehicles and CCTV units
4. Environment & Infrastructure – Vehicles supporting Country Park Rangers, Housing, Environmental Health, and a range of light commercial
and specialist operational requirements
5. Health & Social Care Partnership (HSCP) – Fleet cars, vehicles used for home support, day and resource centres
Fleet Vehicle Types 
1. Heavy Goods Vehicles (HGVS) 
2. PSV (Passenger Transport Vehicles) 
3. Light Commercial Vehicles (Cars, Vans, People Carriers) 
4. Precinct Sweepers 
5. Pick Up 4X4s 
6. Tractors 
Page 60 of 228

Page 61

Fleet Asset Management Plan – 2026 to 2035  9
Maintenance of Fleet 
All fleet servicing and maintenance is carried out in-house within the vehicle workshop. The workshop undertakes a range of essential regulatory
duties on behalf of the Council’s fleet users and is also responsible for conducting taxi compliance tests for all NLC-licensed approved taxi operators. 
Workshop Vehicle Frequency 
1. Heavy Goods Vehicles: Serviced 4-6 Weekly
2. Buses & Street Cleaning Vehicles: Serviced 8 Weekly
3. Light Commercial Vehicles and Plant: Serviced 6 Monthly.   
Workshop Staffing 
The effective operation of a vehicle workshop and plant/groundcare service depends on a well-structured and appropriately skilled staffing model
that underpins safety, reliability, and operational efficiency across all fleet activities. Vehicle workshop staffing typically comprises qualified vehicle
technicians, MOT testers, apprentices, parts specialists, and Inspectors. Together, these roles support diagnostic activities, repairs, planned
preventative maintenance, statutory inspections, compliance monitoring, and accurate record keeping, ensuring vehicles consistently meet
roadworthiness and legal standards.
The plant and groundcare workshop complement the fleet workshop and operates through specialist technicians trained in the maintenance and
repair of agricultural, horticultural, and cemetery-related equipment. This includes mowers, tractors, small plant, and seasonal or specialist machinery
essential to frontline service delivery.
Strong cohesion between the vehicle workshop and plant/groundcare teams is essential to maintaining high levels of asset availability throughout the
year. Effective collaboration reduces downtime, enhances workforce and resource planning, and ensures statutory compliance and safety obligations
are met consistently. This is particularly critical where fleet and equipment reliability underpin essential frontline delivery and public-facing services.
Page 61 of 228

Page 62

Fleet Asset Management Plan – 2026 to 2035  10
Job Title Staff Numbers
Business Manager (Fleet) 1
Service Delivery Manager 1
Workshop Co – Ordinator 1
Fleet Inspector 2
Fleet Technician 14
Workshop Assistant 3
Apprentice 2
Vehicle Wash Operative 1 
Inspector (Ground Maintenance) 1
Technician (Ground
Maintenance)
2
Page 62 of 228

Page 63

Fleet Asset Management Plan – 2026 to 2035  11
Corporate Objectives for Fleet
The primary role of Fleet Services is to ensure that North Lanarkshire Council’s operational teams have access to safe, reliable, and fit-for-purpose
vehicles that enable them to deliver essential services to the community. This includes procuring, maintaining, and managing a diverse fleet that
supports the full range of Council operations. Through proactive asset management, effective maintenance planning, and operational support, the
service plays a critical role in enabling departments to meet their service commitments and maintain operational service delivery. 
Aims for Fleet 
1. To ensure the most efficient use of resources and provide and maintain a high level of support to users
2. To maintain high levels of operational vehicle and equipment availability 
3. To strive for best value in fleet management and maintenance operations 
4. To maintain an appropriate degree of flexibility to adjust to the changing operational demands that the Council will face now and in future
5. To facilitate a long-term plan to manage the vehicular assets of NLC 
6. To align with national targets to phase out petrol and diesel vehicles from our public sector fleet 
Page 63 of 228

Page 64

Fleet Asset Management Plan – 2026 to 2035  12
Operator Licence Undertakings 
North Lanarkshire Council’s undertakings under its Heavy Goods Vehicle (HGV) Operator Licence constitute a series of legally binding commitments
made to the Traffic Commissioner. These undertakings are designed to ensure that the Council’s fleet is operated safely, lawfully, and responsibly at
all times. They are enshrined within the Goods Vehicles (Licensing of Operators) Act 1995 and associated regulations, and are enforced to safeguard
road safety, promote fair competition, and ensure the appropriate management of operating centres and environmental impacts.
As an HGV operator, North Lanarkshire Council is required to demonstrate ongoing compliance with a number of core statutory obligations. These
include maintaining all vehicles in a safe and roadworthy condition, conducting regular and effective safety inspections, and retaining comprehensive
maintenance and inspection records for a minimum period of 15 months. The Council must also ensure that all drivers operate in full compliance with
relevant legislation, including driver hours, working time, and tachograph requirements.
In addition, the Council must continue to satisfy financial standing requirements, maintain good repute, and, where applicable, ensure that a suitably
qualified and professionally competent Transport Manager is appointed to exercise continuous and effective control over transport operations.
Failure to meet these undertakings may result in enforcement action by the Driver and Vehicle Standards Agency (DVSA), deterioration of the
Operator Compliance Risk Score (OCRS), and formal regulatory action by the Traffic Commissioner. Such action can include the calling of a Public
Inquiry and may ultimately lead to the curtailment, suspension, or revocation of the Operator Licence. 
The Council’s nominated certificate of professional competence holder is, John McElhinney, Business Manager (Fleet) 
Operator Licence
Number 
Number of Vehicles 
OM0012238 73 
Page 64 of 228

Page 65

Fleet Asset Management Plan – 2026 to 2035  13
Carbon Emission Reduction 
The Scottish Government declared a climate emergency in April 2019. It has set several targets to reduce emissions from the transport sector which
contributes a large part of the country’s total carbon emissions. For the public sector, these targets include: 
1. Phasing out petrol and diesel cars by 2030
2. Phasing out the need for new petrol and diesel light commercial vehicles from 2025 -30  
3. Phasing out the need for new petrol and diesel heavy duty vehicles from 2030 onwards (Vehicles with a gross vehicle weight of more than 3.5t
or passenger transport vehicle of more than 8 seats buses and coaches) 
Our fleet service will continue to work collaboratively with vehicle‑using departments to ensure the Council’s fleet evolves in line with emerging
technologies and Scottish Government policy. This creates a significant opportunity for North Lanarkshire Council to drive innovation, modernise fleet
practices, and enhance Fleet Asset Management across the organisation.
Due to the complex and highly regulated nature of fleet operations, changes to existing practices are expected over the next five years, driven by
operational need, national policy, legislative change, industry best practice, and environmental considerations. 
Page 65 of 228

Page 66

Fleet Asset Management Plan – 2026 to 2035  14
Fleet Performance 
A core objective of the Fleet Asset Management Plan is to provide a clear and comprehensive assessment of current service performance. The use of
robust performance indicators is essential to strengthening the performance management framework and ensuring effective corporate governance
of the Council’s fleet assets.
The Council has established a suite of key performance targets for fleet that are relevant, measurable, and aligned with national benchmarking
standards. 
In parallel, the Council will continue to develop local performance measures that reflect corporate priorities and support continuous improvement in
service delivery to meet community needs. 
Performance indicators will be reviewed regularly to ensure they remain relevant, provide accurate and meaningful insights, and effectively inform
management decision-making across the Fleet service.
Fleet performance is external audited and accredited to ISO 9001:2015, ISO 14001:2015 & ISO 45001:2018 
Sample of KPI
Number of Vehicles Inspected Within ISO Week 
Number of MOT Passed 1st Time 
Number of Light Commercial Fleet that is Alternative Fuel 
Page 66 of 228

Page 67

Fleet Asset Management Plan – 2026 to 2035  15
Fleet Data Management Systems
The Council’s Fleet data is collected, recorded, and monitored through three integrated management systems, each supporting different aspects of
fleet operations:
1. Freeway Fleet Management System
Freeway is the Council’s primary fleet management system and provides comprehensive support for fleet and asset administration. The system
covers a wide range of operational functions, including vehicle and asset management, driver documentation, accident and risk management
reporting, hire and leasing orders, work authorisation, and vehicle workshop and stores management. Freeway enables effective oversight and
control of fleet assets throughout their lifecycle.
2. Insego – Fleet Tracker System
Insego provides real-time fleet performance monitoring and vehicle tracking. The system allows the Council to view vehicle locations, monitor key
performance indicators (KPIs), and analyse operational data through an easy-to-use dashboard. Insego offers an extended range of reports, including
address reports, trip reports, logbooks, and working time reports, providing detailed insight into fleet usage and performance. The data is live and is
reported monthly to User Departments.
3. Fuellink Fuel Management System
Fuellink is a web-based fuel management system designed to secure fuel against unauthorised use and to enable the monitoring and control of all
fuel-related activity. Fuel data is entered manually by drivers at the vehicle pump. This information is then processed through the FUELtran system,
providing real-time access to vehicle, driver, fuel stock, and fuelling data 24 hours a day, 7 days a week. The system also allows Fleet Services to
monitor additional fuel usage and identify trends or anomalies. 
Page 67 of 228

Page 68

Fleet Asset Management Plan – 2026 to 2035  16
Vehicle Replacement Programme
As part of the vehicle replacement programme, the council operates a vehicle purchase policy for most categories of vehicles to ensure the most cost-
effective operation of our assets. 
The policy considers the following factors:
1. Condition
2. Mileage
3. Age
4. Whole-life costings
5. Environmental targets 
In 2025/26 there is a planned investment of £5.5M which represents 30 new vehicles across the Council. It is the responsibility of each Department to
identify their operational need and to ensure sufficient budget to accommodate their replacement program. The replacement program has been
developed in accordance with optimum replacement timing principles, based on whole of life costs. 
Estimates of vehicle residual values are factored into whole-life costing calculations, so that vehicle disposal is considered from the beginning of the
Council’s operational planning. Vehicles identified for disposal will be fully assessed to determine the requirement for replacement and levels of
service and see what options are available for alternate service delivery, if any. 
Year  Budget 
26/27 6.0m
27/28 6.0m
28/29 2.0m 
The Council will continue to consider all potential procurement routes for future purchases, along with any other suitable/innovative forms of
funding, in circumstances where such arrangements maximise value for the Council. 
The Council has had a long running Policy to purchase fleet vehicles rather than lease and a financial option appraisal is regularly undertaken to
identify the most cost-effective funding method for NLC vehicle acquisitions.  This means that a capital or revenue receipt at disposal is achieved, and
Page 68 of 228

Page 69

Fleet Asset Management Plan – 2026 to 2035  17
the arrangement allows for more flexibility during the life of the vehicle. Any enhancements to vehicle condition or capability are to the benefit of NLC
rather than the lease company.   
Page 69 of 228

Page 70

Fleet Asset Management Plan – 2026 to 2035  18
Ownership of The Fleet Asset Management Plan 
The Fleet Asset Management Plan is a live document, controlled by the Chief Officer (Community Operations) and the Business Manager (Fleet). 
The main function of these roles: 
1. Distribution to appropriate staff, members, and the public
2. Monitoring of improvement actions and the implementation plan
3. Authorising the updates to the plan 
Position Role
Chief Officer (Community
Operations  
Owner of the FAMP 
Business Manager (Fleet) 
Oversight, ensuring that all
appropriate information is
collated and passed to the
relevant parties involved in
the asset management
process 
The FAMP will be reviewed and updated annually, as a minimum, with key processes linked to the budget cycle the Corporate Planning process. 
Page 70 of 228

Page 71

Fleet Asset Management Plan – 2026 to 2035  19
Operational Challenges 
Our Fleet service will facilitate, vehicle user group meetings with all key vehicle stakeholders to identify future needs and operational requirements.
These meetings provide an important forum for engagement, collaboration, and forward planning across the organisation.
Effective communication is critical to the successful implementation of the Fleet Asset Management Plan (FAMP). As delivery of the plan progresses, it
is recognised that ongoing communication and consultation with stakeholders will be essential to ensuring alignment, managing change, and
achieving intended outcomes.
Procurement 
The Scotland Excel framework is used for purchases of heavy goods vehicles. The Council also makes use of the Government Procurement Fleet
Portal which is a framework agreement for light commercial vehicles.  Procurement of vehicles will continue to follow best practice. 
The Council’s Procurement Strategy provides a structured framework to ensure best value is achieved across all procurement activities. Procurement
decisions are informed by whole-life costing principles, beginning with the identification of operational requirements by the relevant service areas.
Within Fleet, there is a continuous and evolving challenge to embrace technological advancement and innovation in support of the Council’s journey
towards net zero emissions. Fleet will continue to trial emerging vehicle technologies through the use of demonstrator vehicles, working
collaboratively with user departments to assess whether these solutions meet operational and service delivery requirements. 
VRP Procurement Strategy: 
VRP Procurement Strategy v1.0.pdf 
Page 71 of 228

Page 72

Fleet Asset Management Plan – 2026 to 2035  20
Future needs and Challenges 
Looking ahead, the industry faces a range of significant challenges during the coming period. A central priority of the forthcoming strategy will be the
effective adoption of new technologies across the Council’s fleet, alongside supporting anticipated changes to working practices within many
operational areas.
The Council’s fleet plays a vital role in the delivery of frontline services to the residents of North Lanarkshire. For many communities, it represents the
most visible expression of the Council’s activity. It is therefore essential our fleet consistently demonstrates high standards of quality, reliability, and
operational efficiency, reinforcing public confidence and supporting the Council’s wider service objectives.
Some of the key challenges we anticipate are outlined below: 
1. Converting the vehicle workshop to digital working 
2. To attain DVSA Earned Recognition for Operators Licence
3. Maintaining highly trained and qualified workforce capable of meeting the challenges of innovative and emerging technologies
4. Creating a pathway for apprentice Technicians to gain full qualification with “grow your own mindset”
5. Ensuring that the primary users are aware of innovations and new technology solutions which maximise use of the fleet and minimise
operational costs
6. Continuing to work closely with Transport Scotland and Energy Saving Trust with Investment opportunities within Fleet
7. Reducing the average age of the fleet 
Page 72 of 228

Page 73

North Lanarkshire Council
Report 
Environment and Climate Change Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref     Date 29/04/26 
Road Safety Plan 
From  Pamela Humphries, Chief Officer (Place)  
E-mail Gary Wood, woodg@northlan.gov.uk   
Executive Summary
This report provides an update on the implementation of the policy for prioritising road
safety improvements, which was approved by Committee in February 2023.  At that time it
was agreed that a report reviewing the operation of the policy would be brought back to a
future committee.  Further, a motion approved at Council in June 2025 agreed that a review
of the current policy should be undertaken and reported to this Committee. This report
includes details of the number of requests submitted and assessed under the current policy
framework and details of the projects which have been completed or are in progress.  The
report also considers the effectiveness of the current policy and potential improvements to
streamline the process for targeting high risk sites and ensure best value from available
resources. 
It is also acknowledged that the scope of the current policy is focussed on engineering
interventions and does not include other interventions that influence road safety such as
education, publicity campaigns, roads maintenance and fleet vehicles, as well as
enforcement activity through Police Scotland.  The approach to work in partnership with
key stakeholders able to influence road safety is also outlined within this broader scoped
Road Safety Plan. 
Recommendations 
It is recommended that the Environment and Climate Change Committee: 
1. Acknowledge the position as set out in the report that the current policy has been
effective in improving road safety at high-risk areas.
2. Consider the findings of the review of the current policy and approve the proposed
amendments to the process for identifying and prioritising sites for intervention.
3. Endorse the approach to work in partnership with key stakeholders as part of a
wider Road Safety Plan.  
4. Note that an annual update on the Road Safety Plan will be reported to Committee. 
Page 73 of 228

Page 74

1. Background 
1.1 The Road Traffic Act 1988 section 39 makes provision for each local authority to carry out
studies into accidents and to take steps to both reduce and prevent accidents.  This places
a duty on each local authority to:
a)   Carry out studies into accidents arising out of the use of vehicles on roads or parts of
roads, other than trunk roads within their area; and
b)  in the light of those studies, take such measures as appear to the authority to be
appropriate to prevent such accidents. 
1.2 The Scottish Government’s Road Safety Framework sets out an ambitious and compelling
long-term goal for road safety where no-one dies or is seriously injured on Scotland’s
Roads by 2050. Whilst the number of collisions have generally reduced in North
Lanarkshire in recent times, there is still work to be done in meeting the national targets. 
1.3 To help achieve that vision, the framework sets out five strategic outcomes which describe
the road safety environment it aims to deliver. These outcomes align with the five pillars
of the Safe System: Safe Road Use; Safe Vehicles; Safe Speeds; Safe Roads and
Roadsides; and Post-crash Response. This safe system approach has helped reduce road
collision casualties significantly in Scandinavian countries. Whilst the council cannot
directly influence Safe Vehicles and Post-crash Response, the council can influence Safe
Road Use, Safe Speeds and Safe Roads and Roadsides. 
1.4  To comply with its obligations, the council maintains a road collision database using
information provided by Police Scotland (STATS19/STATS21). This collision data is
updated monthly. It should be noted that since September 2016, non-injury collision details
are not recorded by Police Scotland.  Given this, there is no consistent or objective way of
collating or considering either non-injury collisions or near-miss events. 
1.5 The council receives over 250 requests per annum for road safety improvements.  These
requests are predominantly requests for traffic calming measures or pedestrian crossings. 
It is not possible for the Council to action all requests with available resources. 
1.6 On 8 February 2023, the Committee approved a revised criteria for assessing and
prioritising road safety improvement requests.  The intention was to implement a fair and
transparent process which involves undertaking traffic surveys at all locations for which a
request was received, and considers a number of factors including vehicle speeds,
volumes and collision history. A copy of the assessment criteria is attached at Appendix
1. 
1.7 It was agreed at this Committee that a report reviewing the operation of the policy be
brought to a future Committee at an appropriate time.  Further, at the meeting of the
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (17) Ensure we keep our environment clean, safe, and attractive
Programme of Work Statutory / corporate / service requirement
Page 74 of 228

Page 75

Council on 19 June 2025 a motion was raised ‘that a review should be undertaken to
evaluate the effectiveness of the policy and to consider whether any further revisions may
be appropriate. The review should include: the number of requests submitted and
assessed under the current policy framework; and details of those requests which have
progressed to completion’. 
2. Report 
Overview of current policy 
2.1 Since 8 February 2023, when the current assessment methodology was approved by
Committee, around 800 requests for road safety improvements have been received.
These include requests for traffic calming, pedestrian crossings, speed limit reductions,
and parking restrictions.  Discounting duplicate requests for the same area and requests
not within scope of the current policy, for example, parking restrictions, results in
approximately 600 locations which have been evaluated to the current policy. 
2.2 To ensure that sites are assessed and prioritised in accordance with current policy, a traffic
survey must be undertaken, and collision analysis carried out.   Undertaking these traffic
surveys costs upwards of £50k p.a. in addition to approximately £50k p.a. of staff time
processing requests, both funded from the road safety budget. 
2.3 It should be noted that in addition to evaluating requests, an annual accident review is
undertaken whereby sites are identified which have four or more collisions within a 100m
diameter ‘cluster site’ over the previous five-year period.  Following elimination of collisions
which are not related, e.g. isolated collisions on side roads where the main cluster is
focussed on the junction, and collisions involving serious criminal activity, locations with
four or more collisions are scored and ranked in the same manner as requests. 
2.4 From the 600 locations that have been scored, 41 locations met the Stage 2 threshold to
be considered for road safety improvements at time of evaluation. The priority list is
reviewed and updated annually, reflecting collision history in the preceding 5-year period,
and sites where there is not a viable engineering solution are removed.  As a result there
are currently 15 locations where potential road safety improvements are prioritised for
feasibility, design or construction, dependant on their stage of progress and available
resources. 
2.5 The assessment process has demonstrated that the dominant factor for sites to meet the
threshold for road safety improvement investigation is collision history, with the remaining
criteria typically being a secondary factor in determining the overall score.  It should be
noted that external funding from Transport Scotland’s Road Safety Infrastructure Fund,
which comprises a substantial proportion of the Council’s overall road safety budget, is
granted on the basis of addressing historic collisions, since this is generally accepted to
be the best predictor of the likelihood of future collisions. 
Budget 
2.6 The total estimated budget allocation for road safety improvements for the period of the
current 5 year capital programme (2024/25 – 2028/29) is £11m, which includes £7.4m
from the council’s core capital programme, and an estimated £3.6m from Transport
Scotland’s Road Safety Improvement Fund, which is confirmed on an annual basis.  The
Page 75 of 228

Page 76

budget is allocated between traffic calming improvements, new pedestrian crossings and
the replacement of ageing traffic signals.  In the current year the council was successful
in securing an additional £1.223m from Transport Scotland towards the Bargeddie Cross
signalised junction improvements and the recently constructed A73 Stirling
Road/Dykehead Road Junction signalised junction improvements. 
Review of completed projects 
2.7 A total of 15 road safety improvement related projects have been completed since
February 2023 (Appendix 3, Table 1 and Table 2). Completed project spend is c. £7.8M
with a further c. £2.1M of projects committed and under construction.  Improvement
projects have been presented under the headings of ‘traffic calming’ (11) and ‘pedestrian
crossings’ (4) to reflect how they have originated and been assessed to the current policy. 
In addition, 20 traffic signal installations were renewed and upgraded at a cost of c. £2.2M. 
2.8 It should be noted that several of the projects have been funded by sources other than the
road safety budget, including external funding from SPT and Transport Scotland for active
travel.   The primary focus of these projects is on improving active travel and transportation
links for example, with secondary but meaningful benefits for road safety.  This ensures
that the road safety budget is preserved and targeted to address the highest risk sites that
have a viable engineering solution. 
2.9 Appendix 3, Table 1 and Table 2 present the completed projects with site collision history
in the five-year period pre-completion and post completion.  The data generally indicates
that collisions have been eliminated or substantially reduced where road safety
improvement projects have been delivered, albeit a full 5-year accident history is not yet
available. 
2.10 Also included in Appendix 3 is the ‘First Year Rate of Return’ which is used to show how
cost-effective an accident prevention measure is within the first year after it is
implemented. This helps with the consideration of whether a project represents good value
for money as it compares the cost of carrying out the work with the financial and human
cost of road casualties, using a methodology and figures set by the Department for
Transport, and Transport Scotland.  This is important because Transport Scotland requires
it as evidence for Road Safety Improvement Funding, which makes up a significant
proportion of the funding used to deliver road safety projects.   
2.11 The evidence shows that the interventions have been effective in improving road safety at
high-risk locations and are generally a good value return on investment when simply
considering collision prevention.  The rate of return does not take account of any potential
secondary benefits to traffic flow, accessibility or active travel provision, for example. 
Review of North Lanarkshire road collision data 
2.12 Over the previous 5-year period, there have been 1422 casualties on both local roads and
trunk roads, with 1170 of those occurring on local roads (Appendix 4, Table 3 and Table
4).   
2.13 The annual average number of casualties within North Lanarkshire, including trunk roads,
was 594 within the five-year period of 2014 to 2018 (Appendix 4, Table 5).  This is the
baseline period for Transport Scotland’s Road Safety Framework to 2030, which sets
Page 76 of 228

Page 77

targets of a reduction of 50% reduction in serious and fatal casualties and a 60% reduction
in serious and fatal casualties affecting children.  The total number of casualties in 2024
was 266, which represents a reduction of 55% from baseline. Serious casualties have
reduced by around 25% in recent post-policy years compared to baseline. However, fatal
casualties have increased from an annual average of 5 at baseline to 7 post-policy
including trunk roads.  This is mostly attributable to fatalities sustained in 2024, which was
unusually high.  
2.14 There is clearly more work to be done to meet Transport Scotland’s ambitious targets. 
However, benchmarking against other Local Authorities and the Scottish average shows
that North Lanarkshire’s progress towards meeting targets is largely comparable
(Appendix 4, Table 5). A comparison of neighbouring authorities reveals that North
Lanarkshire experiences a similar number of road casualties per km of road to South
Lanarkshire and West Lothian Councils (Appendix 4, Table 6).  It should be noted that
more heavily trafficked roads are expected to experience higher accidents per km, which
may explain why Glasgow City Council experiences the highest accidents per km. 
Contributory Factors 
2.15 Contributory factors, or road safety factors as they are now known as, are recorded using
STATS19 forms and are generally based on observations taken by the attending police
officer, although a contributory factor is not always recorded.  There are dozens of
potential factors, grouped into categories such as road environment, vehicle defects, driver
behaviour and vision impairment.  Interrogation of STATS19 data shows that the category
associated with the greatest number of collisions throughout North Lanarkshire is ‘driver
error’ followed by ‘driver behaviour’ (662 and 259 instances respectively in the previous
five-year period).  This highlights the importance of driver awareness and education
campaigns.  In addition, there has been a marked increase in recordings of
‘careless/reckless driving’ and ‘dazzling sun’ in period 2023 – 2025 compared to 2020-
2022 (60 to 121 and 18 to 42 instances respectively). 
2.16 Categories that have greatest potential for road safety improvement projects include ‘road
environment’, ‘driver vision affected’, and contributory factors associated with excessive
speeding, which all reduced in 2023-2025 compared to 2020-2022 (73 to 51, 18 to 4, and
77 to 39 instances respectively). There were also substantial reductions in collisions with
a recorded contributory factor of ‘slippery road due to weather’, ‘failed to look properly’ and
‘travelling too fast for conditions’ (48 to 17, 175 to 136, and 49 to 25 instances respectively
in 2023-2025 compared to 2020-2022). 
2.17 Analysis of contributory factors is part of feasibility and subsequent design of viable sites
that meet the relevant threshold score for further consideration.  Casualty sites with
contributory factors not associated with the environment are less likely to have a road
improvement solution. 
Review of current road safety improvement prioritisation methodology 
2.18 As outlined above the current policy is considered to be effective at addressing road safety
at sites where there has been intervention.  However, there are potential improvements
that can be made to streamline the process for identification of sites at greatest risk and
for improving best value by prioritising the delivery of projects that have a high benefit to
cost ratio.
Page 77 of 228

Page 78

2.19 From the 800 requests and the resulting 600 evaluations, 41 have met the threshold for
prioritisation since policy commencement, with 15 currently meeting the threshold.  Fifteen
sites is a manageable number to progress through design and construction, if budget
permits, and would take several years to deliver assuming existing funding is maintained
and annual rankings do not substantially change. Therefore, amending thresholds to
increase the number of sites for consideration would not accelerate delivery, given that
resources are the limiting factor. 
2.20 There is a perception that the current process is reactive.  However, collision history is
generally accepted to be the best predictor of the likelihood of future collisions.  To the
service’s knowledge, it is the principal measurement used by other Local Authorities and
Transport Scotland to calculate collision risk and justify award of external funding.  Like
some other Local Authorities, pre-emptive factors such as vehicle speed, proximity to
sensitive trip attractors, etc. are currently considered in scoring and ranking sites for
potential road safety improvements, but these have a secondary impact over collision
history. 
2.21 The service is however exploring the potential for emerging technology such as the use of
connected vehicle data and AI to predict potential collisions and risk profile sites to
supplement collision history.  Many modern vehicles are a source of data to approximate
vehicle speeds and traffic flow, for example, which is less costly and time consuming than
conducting traffic surveys.  Connected vehicle data can also identify where harsh braking
occurs, which may help identify sites with collision risk.  Evaluation of the suitability of
connected vehicle data and AI tools is ongoing and will take time to trial and consider.
Should trials prove that adoption is likely to be cost effective, proposals for any
amendments to the methodology will be brought before a future committee meeting. 
2.22 As outlined in section 2.2, the resource needed to process requests is approximately
£100k p.a.  Additionally, requested sites that meet the threshold are often already
identified within the annual review of cluster sites, or their priority is changed by the results
of the subsequent annual review.  Of the 800 requests, only seven requested sites met
the stage 2 threshold that were not identified within the previous or subsequent annual
review.  Given that collision history is accepted as being the predominant factor in the
prioritisation of traffic calming works there is potential to streamline the assessment
process by introducing an initial stage for traffic calming requests based solely on collision
history.  This would result in only undertaking traffic surveys and further assessment for
sites that are more likely to meet the stage 2 threshold for prioritisation. 
2.23 Analysis of over 500 site assessments to date has shown that, excluding sites with
fatalities, a minimum of three collisions within the previous five-year period was required
to meet the stage 2 threshold for prioritisation.  It is therefore proposed that in processing
traffic calming requests, a minimum of three collisions within the previous five-year period
is required before surveys and scoring is undertaken.  The proposed exception to this will
be sites experiencing a fatality, which shall be progressed to feasibility and prioritisation
assessment as soon as practical after their occurrence.  This change aligns with the
principal that collision history is generally accepted to be the best predictor of the likelihood
of future collisions.  The proposed prioritisation methodology is given in Appendix 2. 
Page 78 of 228

Page 79

2.24 Under the current process, viable sites which meet the stage 2 threshold are prioritised for
delivery by risk score alone.  There is no formal mechanism to allow for the prioritisation
of lower scoring schemes which have a greater benefit to cost ratio. This could allow for
the delivery of less costly improvements to several locations rather than delivering one
expensive scheme (to address the single top scoring site), resulting in better value.  It is
therefore proposed that traffic calming requests which meet the stage 2 threshold and
have a feasible engineering intervention are prioritised for delivery by their estimated
benefit to cost ratio (First Year Rate of Return as explained in section 2.10). 
2.25 Analysis of the current policy has highlighted that the pedestrian crossing locations that
met the threshold score to progress were less dominated by collision history, instead more
driven by pedestrian and vehicle demand. This aligns with the typical process for
evaluating the need for a pedestrian crossing, which is primarily based on assessing the
opportunity to safely cross the road rather than collision history.  Consequently, it is
proposed to retain the current assessment and prioritisation methodology for pedestrian
crossings, i.e. prioritised by score rather than benefit-cost ratio with no initial stage collision
history requirement. 
20mph speed limits 
2.26 The implementation of 20mph zones, in accordance with Scottish Government policy, is
an important measure to improve road safety which does not explicitly feature within the
current policy.  The Case for Change for 20mph speed limits is being brought as a separate
report to committee. 
Partnership working 
2.27 The current policy focuses on the prioritisation methodology for delivering traffic calming
and pedestrian crossings, i.e. physical road safety improvements.  However, driver error
and driver behaviour are contributory factors in many collisions. Education and awareness
campaigns are important tools to address this.  Other council services also have an
important part to play, including Roads & Asset Services and Fleet Services with respect
to maintenance and vehicle safety, as do the Police. 
2.28 Police Scotland
The council and Police Scotland are committed to continuing to work closely together to
reduce casualties across our network. Areas of concern are raised and discussed at the
Lanarkshire Road Safety Governance Board meetings. Furthermore, there will continue
to be direct dialogue and intelligence sharing in relation to moving traffic offences and
siting and provision of safety cameras. Responsibility for both these matters lies with
Police Scotland. The intention is to further strengthen this partnership by convening
additional meetings to discuss operational ‘blue-light’ issues with all the emergency
services. 
2.29 Misuse of ‘off-road’ vehicles continues to be a challenge for many authorities and
agencies, and this council is no different in this regard. Discussions are continuing with
Police Scotland, who are responsible for enforcement of such activities. To support the
Police, the council’s Community Partnership teams are gathering intelligence from the
communities on hot spot areas with a view to setting up local action plans to tackle this
anti-social behaviour. 
Page 79 of 228

Page 80

An online consultation on the misuse of off-road bikes was carried out during September
and October 2025. The survey was widely promoted and received a total of 2,179
responses were received. The findings were shared with Community Boards during late
2025 and early 2026, and the feedback has helped identify local hotspot areas to inform
future partnership action and enforcement activity. 
2.30 Education and publicity campaigns
Road safety education is key to reducing casualty risk. Road Safety Scotland, a subsidiary
of Transport Scotland, develop and supply a wide range of educational material for use in
Primary and Secondary Schools.  The council’s Education & Families service has recently
undertaken a survey of schools regarding the delivery of road safety education and usage
of the available material. The findings were that almost all establishments (94%) include
road safety in their curriculum.  Road safety is seen as a core part of personal and social
education for students and as part of curriculum planning. A high proportion of schools are
using the available educational material and work is on-going to further promote the
available resources to ensure road safety education is consistently embedded within the
school curriculum.  In addition, cycle training for children, including working with third
parties, will continue to be a priority.  These ambitions will be underpinned by the
promotion of appropriate and targeted road safety awareness campaigns, including
coordinated campaigns with Road Safety Scotland. 
2.31 Road maintenance
A well-maintained road network reduces accidents, improves traffic flow, and ensures the
longevity of infrastructure.  Defects in the road surface can cause vehicle damage or loss
of traction, particularly in wet or icy conditions. Poor drainage results in standing water,
heightening hydroplaning risks. Similarly, worn or missing road markings or inadequate
signage compromise lane discipline and visibility, especially at night. Winter gritting
ensures road safety, prevents accidents, and keeps transportation networks functional
during adverse weather. Effective maintenance supports the safety of all road users,
including cyclists and pedestrians, who may be more exposed to the effects of surface
defects and poor conditions.  Modern asset management emphasises a risk-based
approach that prioritises resources based on risk rather than fixed intervals.  This
approach involves assessing risk factors, categorising defects and prioritising
interventions where they have the greatest impact, making roads safer for all users. 
Inspection regimes take into account factors such as traffic volumes, speed limits, accident
history, and environmental conditions, so that routes presenting greater safety risks
receive proportionately more frequent attention. By focusing on risk, accidents caused by
surface defects are reduced, limited budgets are optimised by undertaking maintenance
through an informed asset management approach, and resilience of the network against
extreme weather and increased traffic demand is improved. The Transportation
Engineering team will continue to work closely with colleagues in Roads and Asset
Services to highlight areas at greater risk of collisions where maintenance interventions
are likely to be of value. 
2.32 A risk-based asset management plan supports long term planning, ensuring that
investment is directed where it delivers the greatest benefit.  Integrating asset
management within the wider road safety strategy strengthens network resilience,
improves road user confidence, and helps create a safer environment for all who travel on
the network.  An updated Road Asset Management Plan (RAMP) is being brought to
committee as a separate report. 
Page 80 of 228

Page 81

2.33 Design of new roads
Road safety is considered at the earliest stages of potential development, during the
assessment of planning applications.  Consideration is given to the effect of the
development on existing roads, the provision of servicing and parking, and new roads are
assessed against relevant safety guidelines with respect to visibility, layout, geometry,
speeds, and pedestrian and crossing provision for example.  If the effect on the existing
road network is detrimental to capacity or safety, developer delivered improvements, such
as signalised junctions or crossings for example, or contributions towards council delivered
improvements are conditioned as part of planning consent.  In addition, Road Construction
Consent (RCC) is required from the council for a new road or an extension of an existing
road which is to be adopted by the council.   Roads must meet the council’s design
standards and procedures, currently published on the council’s website.  Updated
Guidelines for Development Roads are currently under development. 
2.34 Parking Management
Unauthorised parking can have negative impacts on road safety and accessibility. 
Effective management of parking measures reduces congestion and unnecessary vehicle
manoeuvres around schools, hospitals, commercial areas, and residential streets.  Clear
rules, visible markings, and efficient layouts help drivers make predictable decisions,
which is essential for preventing collisions and keeping traffic flowing at a steady,
manageable pace.  To improve safety and accessibility for pedestrians and other footpath
users such as people using wheelchairs, enforcement of pavement parking and dropped
kerb parking restrictions in accordance with the Transport (Scotland) Act 2019 began in
March 2025.  Town centre and village parking strategies are being reviewed to ensure
they remain fit for purpose. Officers are currently reviewing and altering parking restrictions
in Bellshill and Muirhead/Chryston. Further reviews of Kilsyth and Cumbernauld are
planned to commence in 2026. 
2.35 Council vehicles
The council’s fleet is managed in accordance with recognised best‑practice road safety
standards to ensure that all vehicles remain safe, efficient, and compliant while operating
on the road network. Vehicle maintenance and compliance activities follow the Driver and
Vehicle Standards Agency’s (DVSA) Guide to Maintaining Roadworthiness, which outlines
the legal obligations and best‑practice expectations for keeping vehicles roadworthy. In
addition, the council adheres to the responsibilities and undertakings required to maintain
its operator licence as set out by the Traffic Commissioner and DVSA.  This commitment
includes inspections and servicing schedules, ensuring all drivers are fully trained and
competent, supporting safe driving behaviours across all operational activities.  All council
vehicles are also fitted with telematics-based tracking systems capable of monitoring
speeding, harsh braking, and wider driver behaviours. These systems combined with
incident reporting and continuous performance monitoring help identify emerging risks,
support timely interventions, and reduce collisions and other vehicle‑related incidents.
2.36 Transport Scotland
Road collision statistics presented in this paper includes casualties that occur on
motorways and trunk roads in North Lanarkshire, the A725, A8, M73, M74, M8 and M80.
Whilst road safety on these roads is largely out with the council’s control, we will continue
to work in partnership with Transport Scotland and their trunk road operators (BEAR,
Amey, and Scottish Roads Partnership) in respect of road safety. The council will continue
to liaise with Transport Scotland to help progress relevant improvements to our road
Page 81 of 228

Page 82

network in the vicinity of the trunk roads. This approach was key to delivering the recent
road safety and active travel improvements at Belziehill Interchange. 
Current priorities and next steps 
2.37 The construction of Bargeddie Cross signalised junction and controlled crossings is the
council’s current priority project, with an anticipated completion date of August 2026.  This
site has consistently been one of the highest ranked sites by score and by historic
collisions for the past several years.  This project has benefited from £628,905 of additional
external funding from Transport Scotland. 
2.38 The focus for financial year 2026/27 will be to complete works at Bargeddie Cross and
progress the design and construction of the projects contained within Appendix 4, Table 3
and Table 4. 
2.39 It is proposed to bring an annual update on road safety to the committee, which will include
updated accident statistics, completed projects and future priorities. 
2.40 Further to the progression of road safety improvements, broader road safety actions
identified within Appendix 6 will be pursued with relevant partners. 
3. Measures of success 
3.1  Progression towards meeting Transport Scotland’s Road Safety Framework targets for
reduction in the number and severity of recorded road injury collisions across the Council’s
network. 
4. Supporting documentation 
Appendix 1 – Current road safety prioritisation methodology 
Appendix 2 – Proposed road safety prioritisation methodology 
Appendix 3 – Projects completed and projects under construction 
Appendix 4 – North Lanarkshire road casualty statistics 
Appendix 5 – Current priority projects 
Appendix 6 – Road Safety Plan actions 
Pamela Humphries
Chief Officer (Place) 
Page 82 of 228

Page 83

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒  
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒  
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 83 of 228

Page 84

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐     
Page 84 of 228

Page 85

Appendix 1 - Current road safety prioritisation methodology 
Stage 0 - Pedestrian Crossing Demand 
This stage applies only to requests for pedestrian crossings. Requests for traffic calming
measures proceed straight to Stage 1. 
To determine the need for a pedestrian crossing, surveys will be undertaken to identify the four
peak hours with the greatest conflict between pedestrians (P) and vehicles (V). This is known as
the PV2 assessment. 
For example, if there were an average of 50 pedestrians and 600 vehicles recorded in the four
busiest hours, the PV2 value would be 50(P) x 600(V) x 600(V) = 18 million. 
Any site with a PV2 of 60 million or greater will proceed to Stage 1 for further investigation as this
will satisfy the minimum threshold score of 80, which is calculated by dividing the PV2 value by
750,000. 
Stage 1 – Road Safety Indicators 
For every request relating to traffic calming, speeding concerns, road safety issues or pedestrian
crossings, a seven-day classified traffic volume and survey will be undertaken.  This survey will
record the two-way traffic flows, the vehicle composition, and establish the average bi-directional
85th percentile speed.   
Police Scotland’s database will be interrogated to establish the accident history, including
pedestrians, at the locations under consideration.  This review will be for the most recent five-year
period that data is available.  To ensure that the accident history is scalable, and the results are
proportionate, the number of accidents will be measured against the length of the street or area
under consideration. 
The following scoring methodology will be applied to all sites to determine whether they meet the
Stage 1 threshold score for Road Safety Indicators. 
Criteria Description Score 
Accident History
(per accident for the most recent
5 year period) 
Slight 20
Serious 40
Fatal 80 
Speed
(percentage over speed limit)
0% - 10% 5
10% - 20% 10
20% - 30% 20
30% - 50% 30
50% and above 40 
Traffic Volume
(average daily flow)
Per 1000 vehicles 1
Page 85 of 228

Page 86

Vehicle Composition >10% HGVs
(7.5t and above)
5
STAGE 1 THRESHOLD  80 
Only sites that score more than the Stage 1 threshold will proceed to Stage 2 for further
investigation to identify potential traffic calming measures. 
Pedestrian crossing sites that met both Stage 0 and Stage 1 thresholds will proceed to Stage 2
for further investigation about installing a pedestrian crossing. 
Stage 2 – Environmental Factors
Proximity to local trip attractors form the basis of the Stage 2 assessment, as the risk setting will
be higher in and around places such as schools, hospitals, medical centres etc., where there is
likely to be a higher proportion of vulnerable road users. 
Two additional environmental factors will be assessed for pedestrian crossing sites during Stage
2. These factors will take account of vulnerable users and road widths. 
The following scoring methodology will be applied on a site-by-site basis 
Criteria Description Score
Local Trip
Attractors
(within 200m of traffic
survey locations)
School / Nursery School Entrance 15
Significant route to school (other than above) 10
Hospital, Doctors, Nursing Home, Home for Elderly 10
Park / Playpark Entrance (not associated with school) 5
Shops 5
Bus Stops within 400m of count location 5
Health Centre 3
Community; Sports Centre 3
Footway on both sides (no = gets a score) 3   
Additional Factors for Pedestrian Crossings Only
Vulnerable Users Children, elderly or mobility impaired >15% of total
pedestrians
5
Road Width Less than 7.3 metres
Between 7.3 and 10 metres 
Over 10 metres
0
10
15 
Page 86 of 228

Page 87

Ranked and Prioritised Sites
The score obtained in Stage 2 will be added to the scores obtained from the previous stage(s) to
determine whether the following overall threshold values have been met for each site.   
Pedestrian Crossing Sites
Stage 0 Threshold 80
Stage 1 Threshold 160
Stage 2 Threshold 220  
Traffic Calming Sites
Stage 1 Threshold 80
Stage 2 Threshold 130 
Current Road Safety Prioritisation Process Map 
Page 87 of 228

Page 88

Appendix 2 - Proposed road safety prioritisation methodology 
It is proposed that the scoring criteria and thresholds will remain the same as the current
methodology.  The proposed process map is given below.  Proposed changes to the process are
as summarised below:
• Sites experiencing a fatality shall be progressed to feasibility assessment as soon as
practical after their occurrence.  Should an engineering intervention prove feasible, the
project will be ranked by priority for design and construction.
• Introduction of an initial stage for traffic calming requests whereby the requested site is
checked for collision history.  Only sites with collision history of three or greater within the
previous five-year period will progress to stage 1 assessment.
• Traffic calming requests which meet the stage 2 threshold and have a feasible engineering
intervention are prioritised for delivery by their estimated benefit to cost ratio using the
economic and human cost of casualties as defined by Transport Scotland and project
estimates. As is the case currently, priority rankings will be re-assessed during the annual
review.
• The process map clarifies that in addition to requests, an annual review is undertaken. 
The annual review identifies sites across North Lanarkshire with collision history of four or
more collisions within a 200m diameter within the previous five-year period.  These sites
are then scored, assessed for feasibility and prioritised for delivery in the same manner
as requests.
Proposed road safety prioritisation process map  
Page 88 of 228

Page 89

Appendix 3 – Projects completed and projects under construction 
Table 1 – Traffic calming projects completed since Feb 2023 
Project Score
(at time of
commitment)
Casualties
(within 5-year
period prior
to
completion)
Completion
date
Approx.
Cost
Casualties
(post
completion)
First
Year
Rate of
Return
(FYRR)
(payback
period) 
A71 Horsley Brae
/ Brownlee Road,
near
Overtown (junction
realignment &
signals)
Pre-policy
project and
alternatively
funded
4 slight Oct 2022 £3.05M
(funded by
SPT,
Transport
Scotland, and
successful
council capital
bid) 
1 serious
(driver error) 
N/A    
A73 Carlisle Road
/ Petersburn
Road, Airdrie (mini
roundabout and
crossing) 
pre-policy
committed
project - not
scored
4 slight Oct 2023 £700k 1 slight  N/A 
A73 Carlisle Road
/ South Biggar
Road,
Airdrie (double
mini roundabout
and crossing) 
pre-policy
committed
project - not
scored
1 serious, 
2 slight
Aug 2023 £650k 1 slight 12%
(3.7yrs) 
Lindsaybeg Road,
Chryston (new
puffin crossing
and footway
widening works) 
160 2 serious,
2 slight
Oct 2023 £55k 1 slight 259%
(0.38yrs) 
Viewpark Area,
multiple roads,
Uddingston (spee
d limit signing &
lining) 
355 4 serious,
5 slight
Feb 2024  £6k 0 5000%
(0.02yrs) 
A73 Carlisle Road
at Craigneuk Park
Airdrie (new
pedestrian
crossing) 
165 1 serious,
2 slight
May 2024 £260k 0 27%
(3.8yrs) 
Page 89 of 228

Page 90

A80 Cumbernauld
Road / Cardowan
Rd/Station Road,
Stepps (traffic
signal optimisation
and
refurbishment) 
133 1 serious,
3 slight
May 2024 £164k 0 51%
(1.9yrs) 
A803 Kilsyth Road
Queenzieburn
(Pedestrian
crossing and
public transport
improvements) 
186 2 serious,
2 slight
Aug 2025 £12k 0 1183
(0.09yrs) 
A73 Stirling
Road/Dykehead
Road Junction
Airdrie (signalised
junction, widened
footways,
improved lighting
and drainage) 
241 3 serious, 
2 slight
Oct 2025 £750k 0 27%
(3.7yrs) 
Bellziehill
Interchange
Bellshill
(signalised
junction with
widened footways
and cyclist
parapets) 
305 1 fatal, 
2 serious,
5 slight
Oct 2025 £1.75M
(wholly
funded by
Active Travel
Infrastructure
Fund) 
0 39%
(2.6yrs) 
A73 Carlisle Road
S Bends between
Chapelhall &
Airdrie (new anti-
skid surfacing,
edge line &
slowmarkings,
solar active studs
and general
maintenance) 
132 1 serious,
3 slight
Nov 2025 £60k
(£33k funded
by roads
maintenance
budget)
0 151%
(0.7yrs) 
A89 Coatbridge
Road/Langmuir
Road Bargeddie
(removal of
roundabout and
introduction of
traffic signals,
widened footways
and controlled
crossings)
215 2 serious,
6 slight
completion
due June
2026
Est. £2M 0 8.6%
(11.7yrs) 
Page 90 of 228

Page 91

Table 2 –Pedestrian crossing projects completed since Feb 2023 
Project 
Score
(at time of
commitment)
Casualties
(within 5-year
period prior
to
completion)
Completion
date
Approx.
Cost
Casualties
(post
completion)
Airdrie Road Kilsyth (New
puffin crossing with
associated carriageway
resurfacing) 
222 1 serious Oct 2023 £85k 0
Robberhall Road Wishaw
(New puffin crossing with
associated carriageway
resurfacing, drainage and
bus stop improvements) 
278 0 Apr 2024 £81k 0
Chapel Street Airdrie
(Existing island relaced with
new puffin crossing with
associated carriageway
resurfacing and bus stop
improvements) 
269 1 serious,
1 slight
Apr 2025 £80k 0
A723 Carfin
(Existing island replaced
with new puffin crossing
with associated
carriageway resurfacing) 
236 2 slight May 2025 £56k 0
Sikeside Steet, Coatbridge
(Existing island replaced
with new toucan crossing
with associated
carriageway resurfacing,
footway widening and bus
stop improvements)
433 0 Due 2026/27 Est. £60k N/A       
Page 91 of 228

Page 92

Appendix 4 – North Lanarkshire road casualty statistics 
Table 3 – North Lanarkshire casualties including trunk roads 
29/6/20-
31/12/20
1/1/21-
31/12/21
1/1/22-
31/12/22
1/1/23-
31/12/23
1/1/24-
31/12/24
1/1/25-
31/12/25
Number of
fatalities
4 7 6 5 11 4
Number of
people seriously
injured
41 52 79 108 93 87
Number of
people slightly
injured
82 187 202 250 162 169
total 127 246 287 363 266 260
Number of
children fatalities
(under 16) 
0 1 0 0 0 0
Number of
children (under
16) seriously
injured
13 4 14 19 16 15
Source – STATS19
Table 4 – North Lanarkshire casualties exc. trunk roads 
29/6/20-
31/12/20
1/1/21-
31/12/21
1/1/22-
31/12/22
1/1/23-
31/12/23
1/1/24-
31/12/24
1/1/25-
31/12/25
Number of
people killed
2 7 3 1 10 3
Number of
people seriously
injured
35 40 71 90 89 75
Number of
people slightly
injured
69 169 159 193 133 127
total 106 216 233 284 232 205
Number of
children (under
16) killed
0 1 0 0 0 0
Number of
children (under
16) seriously
injured
13 4 14 19 16 15
Source – STATS19
Page 92 of 228

Page 93

Table 5 – Casualties by area and severity inc. trunk roads for baseline period and 2024 
Council Fatal
2014-18
average
Serious 
2014-18
average
All severities
2014-18
average
Fatal
2024 
Serious
2024 
All
severities
2024 
Stirling 6 72 227  9  39  135 
Falkirk 3  72  287  6  40  130 
Glasgow City 12  299  1432  5  223  772 
East Dunbartonshire 0  25  110  1  25  48 
West Lothian 5  94  460  2  57  184 
North Lanarkshire 5  125  594  11 93 266 
South Lanarkshire 11  135  580  8  130 355
Scotland 174 2728 10207 160 1931 5576
Source - Key Reported Road Casualties Scotland 2024 | Transport Scotland 
Table 6 – 2019-2023 collisions average annual collisions per km inc. trunk roads
Source – STATS19, Key Reported Road Casualties Scotland 2024 | Transport Scotland 
Total Slight Serious Fatal
Council Network
(km)
Collisions Col./km rank Collisions Col./km rank Collisions Col./km rank Collisions Col./km rank
GCC 1957 772 0.394 1 544 0.278 1 223 0.114 1 5 0.003 6
WLC 1120 184 0.164 2 125 0.112 2 57 0.051 3 2 0.002 8
SLC 2421 355 0.147 3 217 0.090 4 130 0.054 2 8 0.003 4
NLC 1729 252 0.146 4 159 0.092 3 85 0.049 4 8 0.005 3
Falkirk 1048 130 0.124 5 84 0.080 5 40 0.038 6 6 0.006 2
Stirling 1166 135 0.116 6 87 0.075 6 39 0.033 8 9 0.008 1
Scotland 57327 5576 0.097 7 3485 0.061 7 1931 0.034 7 160 0.003 5
EDC 531 48 0.090 8 22 0.041 8 25 0.047 5 1 0.002 7 
Council Average 268 0.169  - 177 0.110  - 86 0.055  - 6  0.169  -
Page 93 of 228

Page 94

Appendix 5 – Current priority projects 
Table 7 – Current priority traffic calming projects
Rank
by
score
Location Score 
Aug 25
Progress to Date Estimated
Cost
Collisions FYRR
(Payback) 
Rank
by
FYRR
1 Cambusnethan
Street, Wishaw 
ATC 3 
228 Feasibility concluded 25/26.
Design and consultation 26/27,
construction 27/28
Approx. Est.
£400k
0 Fatal 
2 Serious 
5 Slight 
41% 
(2.4yrs) 
9
2 A89
Coatbridge
Road/Langmuir
Road
Bargeddie 
215 Under construction.  Due for
completion June 2026
£2.1M 0 fatal
2 serious
6 slight
8.6%
(11.7yrs)
15
3 Main Street,
Plains
199 Feasibility / prelim design
concluded, detailed design in
26/27 for 27/28 construction.
Programme may be influenced
by EALR (potential for Active
Travel Investment SNR7) 
Est. £1.8M 1 Fatal 
2 Serious 
1 Slight 
36% 
(2.rs) 
10
4 Allanton Road
A71
177 Feasibility concluded 25/26,
detailed design and
construction 26/27. 
Est. £1M 0 Fatal 
1 Serious 
6 Slight 
11% 
(9.5yrs) 
14
5 Bo’ness Road,
Holytown 
172 Feasibility / design and
construction to be completed
26/27 
Approx. Est.
£150k
0 Fatal 
2 Serious 
2 Slight 
95% 
(1.1yrs) 
6
6 Townhead
Road,
Coatbridge
160 Phase 1 – Feasibility, design and
construction to be completed
2026/27 (potential for Active
Travel Investment SNR1) 
Approx. Est.
£1M
0 Fatal 
2 Serious 
3 Slight 
15% 
(6.7yrs) 
12
7 North Road,
Cumbernauld 
160 Design and construction to be
completed 26/27
Est. £70k 0 Fatal 
2 Serious 
1 Slight 
193% 
(0.5yrs) 
5
8 Shottskirk
Road, Shotts
156 Feasibility / prelim design
concluded, detailed design in
25/26 for 26/27 construction
Approx. Est
£250k
0 Fatal 
3 Serious 
0 Slight 
77% 
(1.3yrs) 
7
Page 94 of 228

Page 95

9 Dunbeth Road,
Coatbridge
153 Feasibility / prelim design
concluded, detailed design and
construction in 26/27 
Approx. Est
£200k
0 Fatal 
2 Serious 
1 Slight 
68% 
(1.5yrs) 
8
10 Condorrat Ring
Road, Rannoch
Drive 
141 Feasibility and detailed design
concluded, 26/27 construction
Est. £20k 0 Fatal 
2 Serious 
2 Slight 
711% 
(0.1yrs) 
1
11 Coltness Road,
North
Dryburgh Rd,
Wishaw 
135 Feasibility / prelim design and
construction to be completed
26/27
Approx. Est.
£50k
0 Fatal 
2 Serious 
2 Slight 
284% 
(0.3yrs) 
4
12 Clark Street,
Airdrie
133 Feasibility completed 25/26,
design and construction 26/27
Approx. Est.
£150k
1 Fatal 
0 Serious 
1 Slight 
354% 
(0.3yrs) 
3
13 Hirst Road,
Harthill
132 Feasibility completed 25/26,
design and construction to be
completed 26/27 
Est. £20k 0 Fatal 
2 Serious 
2 Slight 
711% 
(0.1yrs) 
1
14 A89 / East
Muiryhall
Roundabout
132 Feasibility concluded, detailed
design in 26/27, construction
27/28 
Est. £800k 0 Fatal 
2 Serious 
1 Slight 
18% 
(5.6yrs) 
11
15 Dunnswood Rd
/ Forrest Rd,
Cumbernauld
131 Detailed design concluded,
construction 26/27
Est. £1.2m 0 Fatal 
2 Serious 
2 Slight 
12% 
(8.4yrs) 
13 
Table 8 – Current priority pedestrian crossing projects
Rank Location Score Progress to Date Estimated Cost
1 Sikeside Steet, Coatbridge 433 Construction 26/27 Est. £60k
2 Airbles Road, Motherwell 396 Signalised crossings incorporated
within planned active travel
improvements
Est. £60k for ped
crossing at Hamilton
Rd Junction
3 Shields Road, Motherwell 302 Feasibility Ongoing Approx. Est £200-300k     
Page 95 of 228

Page 96

Appendix 6 – Road Safety Action Plan 
action lead responsibility target
implementation /
frequency 
1. Develop 20mph proposals
for consultation 
• NLC (Infrastructure and
Transportation) 
Summer 2026
2. Arrange and engage in
regular liaison meetings with
Police and other emergency
services 
• NLC (Infrastructure and
Transportation)
• Police Scotland
Quarterly frequency
3. Develop plan to tackle anti-
social use of off-road
vehicles 
• Police Scotland
• NLC (Communities)
August 2026
4. Further promote and embed
Road Safety education
within the school curriculum,
including expansion of the
Junior Road Safety Officers
(JRSO) Programme within
primary schools 
• NLC (Education and
Families)
August 2026 
5. Plan and coordinate road
safety awareness
campaigns
• NLC (Corporate
Communications)
• NLC (Infrastructure and
Transportation)
• Road Safety Scotland 
Quarterly frequency
6. Develop Road Asset
Management Plan
• NLC (Roads and Asset
Services)
• NLC (Infrastructure and
Transportation) 
Spring 2026
7. Develop updated Guidelines
for Development Roads 
• NLC (Infrastructure and
Transportation)
Winter 2026
8. Review parking strategies
within town centres and
villages
• NLC (Infrastructure and
Transportation)
Chryston and Bellshill
summer 2026.
Bellshill autumn 2026.
Kilsyth and
Cumbernauld summer
2027. 
9. Trial emerging technology
such as connected vehicle
data and AI tools for
potential to identify and
prioritise sites at risk 
• NLC (Infrastructure and
Transportation)
Spring 2027
Page 96 of 228

Page 97

10. Delivery and evaluation of 
road safety projects in line
with prioritisation
methodology and available
budgets and provide an
annual update to
Committee. 
• NLC (Infrastructure and
Transportation)
annually 
Page 97 of 228

Page 98

Page 98 of 228

Page 99

North Lanarkshire Council
Report
Environment and Climate Change Committee
Does this report require to be approved? ☒ Yes   ☐ No
Ref    RT-22-049 Date 29/04/26
20mph Speed Limits – Case for Change  
From Pamela Humphries, Chief Officer (Place)
E-mail Gary Wood, woodg@northlan.gov.uk
Executive Summary
This report outlines the benefits associated with the rollout of 20mph speed limits on
suitable roads to improve safety, health, and wellbeing. National strategies, including
Scotland’s Road Safety Framework to 2030 and the Programme for Government, advocate
widespread adoption of 20mph limits in built-up areas. 
Evidence from UK and international case studies shows significant reductions in collisions
and casualties following implementation, with benefits extending to vulnerable road users
and active travel.  Local data confirms that roads with 20mph limits have lower collision
and casualty rates compared to those at 30mph or above. 
Assessments of over 4,000 roads across North Lanarkshire are continuing which will
determine 30mph roads considered appropriate to be lowered to 20mph. Thereafter, an
interactive map will be shared with elected members prior to public consultation
commencing outlining the streets proposed to be subject to a lower speed limit.
Recommendations
It is recommended that Environment and Climate Change Committee:
1. Consider the benefits of reduced speed limits in appropriate areas.
2. Endorse the approach set out in the report to progress consultation on the rollout
of 20mph on suitable roads across North Lanarkshire.
3. Note that the final proposals will be reported back to a future committee following
the proposed consultation outlined in this report.
Page 99 of 228

Page 100

1. Background 
1.1 The legislative context for accident investigation and prevention was set out in the Scottish
Government’s Road Safety Framework to 2030, which was launched on 25 February
2021. This sets national targets and measures for casualty reduction to 2030, to which
each roads authority has a duty, under The Road Traffic Act 1988, to contribute. 
1.2 At a national level, Transport Scotland’s Strategic Transport Policy Review 2 (STPR2)
report includes a recommendation to expand 20mph limits and zones in Scotland.
Furthermore, the 2021 Programme for Government (PfG) committed “We will ensure all
appropriate roads in built-up areas have a safer speed limit of 20mph by 2025, forming a
task group to plan the most effective route for implementation”. Across Scotland, councils
are at various stages of considering and rolling out 20mph limits, and therefore the PfG
commitment will not be achieved. 
1.3.  The Council’s Local Transport Strategy (LTS) (2010) referenced improving safety and
security on the transport network across North Lanarkshire as a key priority. The safety
and security policies also contributed to achieving objectives in other areas such as
regeneration, lifelong learning, health and wellbeing and the built environment. Road
safety themed policies previously approved within the LTS included Improving safety in
residential areas, around schools and in town centres including the introduction of 20mph
zones where regulations allow (Policy S7).  This correlates with and supports the above
National Framework and National Strategy for 20mph. 
1.4 The Council’s draft Local Transport Strategy (2026), which has recently been out to
consultation and is expected to be published later this year, highlights concerns about
roads being ‘unsafe’ which discourages people from choosing sustainable and active
travel options for their daily journeys. Projects such as 20mph speed limits in appropriate
locations will help to create safer conditions for all road users 
1.5.  To deliver the National Strategy for 20mph across Scotland, the Scottish Government
established a Task Force that reviewed methods used in setting 20mph speed limits
elsewhere and lessons learned. The group established a pragmatic approach for
assessing roads to ensure a level of consistency when introducing 20mph on appropriate
roads based on the following criteria:- 
• roads within a 100 metre walk of an educational setting (for example, primary,
secondary, further and higher education)
• roads where the number of residential and/or retail premises fronting it (on one or
both sides) exceeds 20 over a continuous length of between 400 to 600 metres
• roads within 100 metre walk of a community centre, church, place of worship, sports
facility, any hospital, General Practitioner (GP), or health centre
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (17) Ensure we keep our environment clean, safe, and attractive
Programme of Work Statutory / corporate / service requirement
Page 100 of 228

Page 101

• roads where the composition of users implies a lower speed of 20mph will improve
the conditions and facilities for vulnerable road users and other mode shift (reflect
on future plans such as active and sustainable travel, places for people, consider
existing and potential levels of vulnerable road users)
• where the road environment, surrounding environment, community and quality of life
impact (for example, severance, noise, or air quality) will be improved by
implementing 20mph speed limits 
1.6 The initial presumption is that all 30mph roads that meet one of the criteria set out in
paragraph 1.5 are appropriate for a lower speed limit of 20mph including residential streets
currently subject to an advisory ‘20’s Plenty’ speed limit. However, there will be some
anomalies, where roads meet the criteria but are not appropriate and others which do not
meet the place criteria but are appropriate for a 20mph speed limit. This is where local
knowledge and community feedback is key to setting the most appropriate speed limit for
the environment. 
1.7 The speed limit reduction would not apply to roads currently subject to a 40mph or higher
speed limit and, in general, a road suitable to remain at 30mph will typically be on A and
B Class roads with little frontage activity and where people walking, wheeling, and cycling
do not need to share space with motor traffic. A minimum road length for the 20mph speed
limit is suggested between 400 and 600 metres. The length adopted will depend on the
conditions at or beyond the end points. 
1.8 Transport Scotland previously engaged with local authorities asking that a 'Road
Assessment' be undertaken using the above criteria on all existing 20mph and 30mph
roads. This exercise was to inform the National Strategy for 20mph with the aim of
ensuring that a consistent method of assessment was being used across Scotland. This
exercise is underway, and should this report be endorsed by Committee, the intention
would be to share the roads likely to be reduced to 20mph from 30mph with elected
members in advance of any formal public consultation taking place.   
2. Report 
Safe Systems 
2.1 The safe system approach to road safety has helped reduce road collision casualties
significantly in Scandinavian countries, and is now commonly being adopted as best
practice in the UK. The safe system is modelled around five key strands: Safe Road Use;
Safe Vehicles; Safe Speeds; Safe Roads and Roadsides; and Post-crash Response. 
Whilst the Council cannot directly influence Safe Road Use, Safe Vehicles and Post-crash
response, the Council can influence Safe Speeds and Safe Roads and Roadsides. 
2.2 One component of the safe system “Safe Speeds” aims to establish appropriate speed
limits according to the features of the road, the function it serves, and the physical
tolerance of those who use it.  20mph schemes are a fitting example of this approach. This
reduces speed and the risk of collisions occurring by providing more time for a driver to
react to unexpected events. If the collision does occur at 20mph it reduces the risk of
causing death or severe injury inside and outside the vehicle. 
Page 101 of 228

Page 102

Evidential Base 
2.3 The evidential base for lowering speed limits in appropriate built-up areas is strong. There
are many case studies that can be referenced which demonstrate real life benefits where
speed limits have been reduced. 
2.4 From 2000 onwards, the Council implemented introduced advisory 20mph speed limits in
every residential area under the Twenty's Plenty initiative. Although the reduction in
vehicle speeds was relatively modest, there was a 25 per cent reduction in the number of
injury accidents over the whole council area in the first year after the introduction of the
scheme compared with the previous year. This was considered a significant reduction,
especially given it was associated with unenforceable speed limits.  The Council have also
in recent years been implementing part-time 20mph speed limits adjacent to schools
throughout our road network. The benefits of this exercise have yet to established. 
2.5 Researchers from the University of Edinburgh worked with the City of Edinburgh Council
in 2019 to gauge the effectiveness of lowering speed limits to 20mph.The study found that
a reduction of not only speed but road traffic collisions was achieved across Edinburgh,
even without extra traffic-calming measures and police patrols, making the scheme cost-
effective. 
2.6 It should be noted that the position of Police Scotland in respect of the enforcement of
20mph aligns with the enforcement activity criteria for all published speed limits. This is
contained within the Speeding Standard Operating Procedure which states “deployment
of resources must prioritise sites which represent the greatest risk and should only be
undertaken where considered necessary and in the interests of casualty reduction.  This
will remain the case where a 20mph replaces a 30mph speed limit. 
2.7 In Bristol (2019), researchers identified a general trend of reductions in road injuries and
strong evidence of a reduction of city-level fatal injuries following the 20mph speed limit
reductions in parts of the city. This suggests that a city wide 20mph speed limits could be
an effective strategy for reducing injuries, as it encourages safer driving behaviour that is
not restricted to 20mph roads. 
2.8 Transport for London recently undertaken extensive analysis of 157 20mph schemes
across their boroughs, which were implemented between 1989 and 2013.  This highlighted
that there was a 34 per cent reduction in the number of people killed or seriously injured
(from 395 to 260), compared against the background trend of a 15 per cent fall in people
killed or seriously injured across borough roads not subject to a 20mph limit over the same
period.  Similarly, a 75 per cent reduction in the number of children killed (from 4 to 1),
compared with no change across the control group. 
2.9 Wales was the first country of the UK to make 20mph the default speed limit having come
into law on 17 September 2023. Although this is a differing approach to Scotland, the
potential impact of this widespread change to 20mph should be noted.  Changes in traffic
speeds on urban roads in Wales have been dramatic following the widespread 20mph
speed limit implementations. Measured speeds dropped an average of 2.9 mph in the
analysis period immediately after the change by simply changing the posted speed limit.
Speeds increased very slightly over the first 3 months to 20.3 mph i.e. 2.4 mph reduction.
In the last quarter of 2023, Wales recorded a 32% decrease in casualties on 20mph and
30mph roads. There were 100 fewer people killed or seriously injured on 20mph and
Page 102 of 228

Page 103

30mph roads in the 12 months following the speed limit change compared to the previous
year. 
2.10 Further afield, in May 2021 Spain introduced a new speed limit of 30 km/h on single-lane
urban roads in towns and cities. A first evaluation of crash data for the year 2021 compared
with 2019 shows that the number of deaths in road crashes on urban roads has decreased
by around 25%, which means 97 fewer deaths. The number of fatal pedestrian crashes
went down by 32%. 
2.11 Recent research also shows people hit by a car driving at 30mph are seven times more
likely to die than if they were hit at 20mph. 
2.12 Falkirk Council has previously piloted the introduction of a 20mph speed limit at Airth.
Whilst the outcome of their trial is not currently known, it is important to note public opinion
in their council area in relation to the lowered speed limits.  Prior to the pilot site, there was
over two-thirds opposed to the roll-out of 20mph speed limits throughout their area. For
Airth 20mph speed limit specifically, over 70% of their community supported the proposals. 
Collision / Casualty Statistics
2.13 Using Police Scotland’s road collision database, data relating to injury accidents for a 5-
year period (2020 to 2024) across North Lanarkshire has been collated. It is important to
note that the data presented includes the Trunk Road network for which the Council has
no remit. See tables below.
Table 1 Average Annual Collision Rate per Km (2020 – 2024)
Speed
Limit
Slight
Collisions
Serious
Collisions
Fatal
Collisions
Total
Collisions
Km of
network
Collision
rate per
km
20mph 2 1 0.2 3.2 62.7 0.051
30mph
and
above
134 69.6 6 209.6 1666 0.126 
Table 2 Average Annual Casualty rate per Km (2020 to 2024)
Speed
Limit
Slight
Casualty
Serious
Casualty
Fatal
Casualty
Total
Casualties
Km of
network
Casualty
rate per
km
20mph 2.8 1 0.4 4.2 62.7 0.067
30mph
and
above
189.0 78.8 6.2 278.0 1666 0.167 
2.14 Tables 1 and 2 above highlight that both collision and casualty rate per km of road network
are lower when roads are subject to 20mph, compared to those with speed limits of 30mph
and above. The reductions highlighted exceed those within the case studies referenced
above.  However, relying on accident rate per kilometre as a sole collision metric has its
limitations. For example, it doesn’t distinguish between low and high trafficked roads. 
Page 103 of 228

Page 104

2.15 The number or kilometre of roads currently subject to a 30mph speed limit but to be
reduced to 20mph is not currently known, as assessments are continuing in this regard.
However, a 50% reduction is not an unreasonable projection at this stage. This equates
to 535km of roads in North Lanarkshire with 30mph speed limits reducing to 20mph. 
2.16 By applying a conservative reduction rate of 20% for collisions and casualties which is
consistent with some of the case studies referenced above, we can estimate that lowering
the speed limits to 20mph could result in annual collisions reducing by 42 from 209, and
similarly for casualties, annually these could reduce by 55 from 278. 
2.17 The current estimate for the rollout of 20mph speed limits across North Lanarkshire ranges
between £1M and £2M. This will require funding from the Council’s existing budget if
funding from the Scottish Government is not available, as the external funding position
available to each local authority is not currently known. For reference, the total budget
available nationally was £10M for local authorities who were in a position to implement
before April 2026. Budget availability beyond April 2026 has yet to be confirmed. To date
only three councils in Scotland have fully completed the roll out of 20mph speed limit
across their network; Aberdeenshire Council, Highland Council and Scottish Borders
Council. 
2.18 It should be noted that the above costs are current estimates, and, as such, should be
taken with caution until all the streets which it is proposed should be subject to a lowered
20mph speed limit are agreed. It may be possible that additional streets are added or
removed following consultation, the process of which is outlined below. 
Next Steps
2.19 Assessments of over 4,000 roads across North Lanarkshire are continuing which will
determine 30mph roads considered appropriate to be lowered to 20mph.  As outlined
above, A and B class roads are expected to largely maintain their existing 30mph speed
limit, unless they meet the place-based assessment criteria outlined by Transport
Scotland. This typically may include town centres, near schools, or areas with a significant
presence of vulnerable road users. 
2.20 The intention thereafter is to map the streets with the proposed lowered speed limit on an
interactive GIS system.  The maps will be shared with local elected members in a future
members’ briefing session prior to public consultation currently estimated to commence in
Summer 2026. 
2.21 A pragmatic and balanced approach to managing road safety whilst also maintaining
economic growth opportunities will be adopted. It should be noted that roads currently
subject to 40mph speed limit or higher, or dual carriageways are not considered
appropriate as part of this process. 
2.22 Typically, any changes to speed limits require the successful promotion of a Traffic
Regulation Order (TRO). This process can take between six and nine months to complete,
is very resource intensive and can be objected to by members of the public or other parties. 
Page 104 of 228

Page 105

2.23 Temporary Traffic Regulation Orders (TTRO) could be considered an alternative route to
implement 20mph speed limits, facilitating expedited progress and allowing the wider
community time to experience the change and for the lower speed limit to be monitored
and evaluated over a maximum period of 18 month. 
2.24 The preferred route for implementing the lower speed limits will be confirmed when the
assessment process is concluded.  Irrespective of the route adopted, there will be the
need for engagement with neighbouring authorities to ensure cross boundary speed limits
are consistent and enforceable. 
3. Measures of success 
3.1  Implementation of lower speed limits on appropriate roads 
3.2 Progression towards meeting Transport Scotland’s Road Safety Framework to 2030
targets for reduction in the number and severity of recorded road injury collisions across
the Council’s network. 
4. Supporting documentation 
4.1 Transport Scotland’s 20mph Speed Limit Implementation Guide - 20mph Speed Limits in
Scotland. 
Pamela Humphries
Chief Officer (Place) 
Page 105 of 228

Page 106

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Implementation costs are currently estimated to cost between £1M and £2M and
these costs will need to be  met from existing budgets  if external funding is not
available. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Legal / Committee Services will need to input into any Traffic Regulation Order
process to reduce vehicle speeds. 
Page 106 of 228

Page 107

5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
A communication strategy will be required to outline the initial proposals and
thereafter how to implement. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Service risk – lack of buy-in from key stakeholders. Risk Mitigation – the status quo
in relation to existing speed limits will remain. 
Page 107 of 228

Page 108

5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 108 of 228

Page 109

North Lanarkshire Council
Report
Environment and Climate Change Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    LR/SW Date 29/04/26 
Roads Asset Management Plan 2026-2030 
From  Lyall Rennie, Chief Officer (Community Operations)  
E-mail renniely@northlan.gov.uk   
Executive Summary 
The Roads Asset Management Policy and Plan (RAMP) set out the approach for the
management of North Lanarkshire’s Roads assets for the next four years and beyond, by
implementing strategies that support and deliver the Roads Asset Management Policy
objectives. 
The RAMP establishes a comprehensive and structured framework for managing the
council’s critical infrastructure assets. By aligning with national, regional, and corporate
priorities, the plan aims to ensure that asset management activities support wider strategic
goals while providing a consistent, evidence-based approach to maintenance, renewal,
and long-term planning. 
The Plan also sets out the key opportunities and financial challenges facing the service,
emphasising the need for ongoing and sustained investment to maintain agreed service
standards. Through this approach, the Plan aims to strengthen the long-term resilience and
performance of the network, improve customer satisfaction, and ensure that the road
infrastructure continues to meet community needs both now and in the future. 
Recommendations 
It is recommended that the Environment and Climate Change Committee: 
(1) Approve the Roads Asset Management Policy (Appendix 1); and
(2) Approve the Roads Asset Management Plan (Appendix 2).  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Page 109 of 228

Page 110

1. Background 
1.1 North Lanarkshire Council’s Corporate Asset Management Plan (CAMP) was approved
at Finance & Resources Committee on 14 September 2022. 
1.2 The Roads Asset Management Plan (RAMP) is identified as one of the documents
required by the CAMP. The overall aim of the RAMP is to provide a sustainable Public
Road network that is safe and will support The Plan for North Lanarkshire to generate
and promote growth in business, leisure and everyday living within our communities. 
1.3 The Public Road network represents the Council’s largest and most prominent
community asset, with a gross replacement value of £4.5 billion. It is relied upon daily
by residents, businesses, and visitors, and plays a vital role in supporting the economic,
social, and environmental wellbeing of our communities. The condition and
performance of this network shape the character and quality of the areas it serves and
make a significant contribution to achieving the Council’s broader strategic vision and
commitments. 
1.4 In order to meet the demands placed on it, it is crucial that the Public Road network is
adequately maintained. Continuing growth in traffic has brought an increasingly
widespread recognition of the importance of these assets and the high value placed on
it both by users and the wider community. 
1.5 The RAMP has been prepared in line with the nationally adopted common framework
developed through the Scottish Collaboration of Transport Specialists (SCOTS) Road
Asset Management Project, which is supported by all 32 Scottish Local Authorities. 
1.6 The RAMP and associated sub-reports will be used to inform elected members of the
long‑term investment requirements for the council’s assets, setting out both the
resources needed to maintain the network and the implications of underfunding. It will
provide a transparent basis for understanding how different levels of investment
influence condition, performance, risk, and long‑term cost. 
2. Report 
2.1  The Road Asset Management Policy formalises the Council’s commitment to the
principles of Asset Management, clearly defines responsibilities and details policy
requirements across 9 policy categories of SCOTS Roads Asset Management
Practices to be adopted assessed and where necessary revised. 
2.2 The Policy guides the management of Council’s roads assets to ensure that:- 
• Assets continue to deliver a service to the community at an agreed level of service, 
• There is clear direction for staff to make informed decisions, 
• Legislative requirements are satisfied, 
• Exposure to risk is limited to acceptable levels, 
• Asset purchases or construction are only approved after whole of life costs and
benefits are assessed. 
Page 110 of 228

Page 111

2.3 The Roads Asset Management Plan (2026 to 2030) sets out the Council’s approach
for the management of the council’s road assets for the next four years by implementing
strategies that support and deliver the Policy objectives. 
2.4 The RAMP sets out a structured approach to:
• Managing a diverse range of road assets
• Improving lifecycle planning
• Targeting capital and revenue funding
• Demonstrating value for money
• Aligning service delivery with national, regional, and corporate priorities 
2.5 The Plan aligns with both national and local transport strategy and the principles of Well
Managed Highway Infrastructure Code of Practice. 
2.6 Assets are defined into 6 distinct groups in accordance with the Chartered Institute of
Public Finance and Accountancy (CIPFA) Code of Practice on Transport Infrastructure
Assets: 
• Carriageways 
• Footways and Cycleways 
• Street Lighting
• Structures
• Traffic Management and 
• Street Furniture. 
2.6  It is widely recognised that the application of modern asset management practices can
enable improved value for money. In these challenging times is it essential that the
Council embraces these methods and strives to ensure that funding is invested as
wisely as possible. This Plan forms an important part of the Council’s commitment to
apply good asset management to roads. 
2.7 The Plan will also take account of the infrastructure renewal programmes procured
through historic, current and future Revenue and Capital budgets and assess to what
extent these investments have arrested depreciation of the asset as a whole. On this
basis future plans will be able to indicate; if funding is sufficient to arrest depreciation
or what funding is required to enable this to happen or what funding is necessary to
improve the asset year on year. The RAMP will also help prioritise infrastructure
renewal projects to make the most efficient use of the funding available. 
2.8 The RAMP recognises that customer expectations around road condition and safety
continue to rise, with the public increasingly sensitive to issues such as potholes and
other reactive defects. This growing demand reinforces the importance of shifting from
a reactive approach to one that places greater emphasis on planned & preventative
maintenance to improve long‑term network condition and value for money. 
Page 111 of 228

Page 112

2.9 The Plan highlights the need for improved communication, transparency, and more
accessible public information about how roads are managed. It sets out enhancements
to digital reporting and feedback mechanisms, alongside clearer public‑facing
explanations of how works are prioritised and programmed. Together, these measures
aim to strengthen trust, improve customer understanding, and support more efficient
service delivery. 
2.10 The RAMP includes SCOTS Core Performance Indicators, covering: 
• Carriageway condition 
• Footway safety and condition 
• Structural inspections and Bridge Condition Indicators (BCI) 
• Lighting safety, energy performance, and column age profiles 
• Traffic signal controller lifecycle and resilience. 
The Service Standards reflect affordable levels of service at current funding, while
identifying gaps where further investment is required. 
2.11 The Plan establishes a clear set of objectives designed to strengthen the management
and long-term sustainability of the road network. This also reinforces commitment to
environmental sustainability, safety improvement, and the promotion of healthier, more
active travel choices. Alongside this, the Plan prioritises cost-effective lifecycle planning
to maximise the value of available resources, while enhancing the quality, consistency,
and use of asset data to support more robust performance management and informed
decision-making. 
3. Measures of success 
3.1 The Roads Asset Management Plan will result in a long-term strategy for the
sustainable and affordable maintenance of all Council owned roads assets. 
4. Supporting documentation 
Appendix 1 – Roads Asset Management Policy 
Appendix 2 – Roads Asset Management Plan 
Lyall Rennie
Chief Officer (Community Operations) 
Page 112 of 228

Page 113

5. Impacts
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 113 of 228

Page 114

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The RAMP highlights the current sustainability practices, policies and objectives
within the management of the road network. Primarily focused on achieving best
value from our existing resources, reducing carbon emissions and energy
consumption, while increasing the use of recycled materials as appropriate. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
Page 114 of 228

Page 115

If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 115 of 228

Page 116

ROADS ASSET
MANAGEMENT
POLICY 
VERSION 1.1 APRIL 2026 
Page 116 of 228

Page 117

ROADS ASSET MANAGEMENT POLICY V1.1 1 
This Policy aligns our road asset management processes and procedures with our
corporate goals and objectives. We recognise the vital role played by the local road
network in supporting the Authority’s vision and its strategic transport goals. 
1. The road infrastructure is a vital element in providing an integrated transport system
that helps promote equality of opportunity for all our residents by improving the
connectivity and accessibility of our transport system. 
2. The road infrastructure is this Council’s most valuable asset, a fundamental component
of long-term planning is to ensure the asset base is preserved and replenished in a
sustainable way without imposing an undue financial burden on future generations. 
3. The Council is committed to making the best use of its budgets and will employ an asset
management approach for the maintenance of the transport infrastructure and assets, in
order to help deliver the vision for local people. 
4. The Road Asset Management Plan (RAMP) will set out how this policy will be delivered. 
5. The Council’s RAMP will seek to deliver a road network that is fit for purpose and
supports a transport system that: 
• Promotes the growth of a sustainable local economy. 
• Improves quality of life for the people of North Lanarkshire. 
• Makes the most of our assets. 
This strategy also incorporates the vision and objectives of the Local Transport Strategy.
As a Roads Authority with almost 1,700 km of carriageway and 2,300km of footways to
maintain, North Lanarkshire Council must manage this network under increasing
pressures from: 
• Growing traffic volumes, particularly heavy goods vehicles, increasing network demands
• Reducing real terms budgets, limited resources, and the need to deliver efficiencies. 
• Rising customer expectations, Increasing demands and greater public accountability.
• Environmental and climate change pressures. 
North Lanarkshire has adopted a coordinated asset management approach to
demonstrate that assets are being managed in a way that stakeholder demands,
Page 117 of 228

Page 118

ROADS ASSET MANAGEMENT POLICY V1.1 2 
expectations, and asset performance are delivered. The asset management approach
enables us to make well informed decisions to ensure the best allocation of scarce
resources for the management and operation of the road infrastructure. 
Over the period of the Council Plan the RAMP will show what pressures are being put on
the road infrastructure and how resources are being managed to meet them.
Page 118 of 228

Page 119

ROADS ASSET MANAGEMENT POLICY V1.1 3 
INTRODUCTION
This Policy statement formalises the Council’s commitment to the principles of Asset
Management and details policy requirements across 9 policy categories. Asset
Management practice will be assessed against these policies on an annual basis and where
necessary revised.   
SCOPE
This Policy statement applies to the creation/construction, acquisition, operation,
maintenance, rehabilitation and disposal of all Council Road Assets.
POLICY OBJECTIVES
This policy guides the management of Council’s Assets to ensure that:
− Assets continue to deliver a service to the community at an agreed level of service.
− There is clear direction for staff to make informed decisions.
− Legislative requirements are satisfied.
− Exposure to risk is limited to acceptable levels.
− Asset purchases or construction are only approved after whole of life costs and
benefits are assessed.
− Clear allocations of responsibilities for the management of each class of asset are
given. 
Assets shall be managed to effectively support The Plan for North Lanarkshire, ‘a shared
ambition for inclusive growth and prosperity for all’ where North Lanarkshire is the place
to Live, Learn, Work, Invest and Visit. 
Page 119 of 228

Page 120

ROADS ASSET MANAGEMENT POLICY V1.1 4 
DEFINITIONS
− Assets: Any physical item that Council acquires or constructs which gives benefit or
service to the community.
− Asset Register: A record of asset information considered worthy of separate
identification.
− Asset Life: Time from construction or acquisition to disposal.
− Asset Management: Activities and practices through which Council optimally
manages its physical assets over their lifecycle for the purpose of achieving the
organisational strategic plan.
− Asset Managem ent Plan: A plan that details financial and technical treatments over
the life of the asset to allow the asset to maintain an agreed level of service.
− Level of Service: The service standard set for an asset group/type. 
− Whole Life Costs: Total cost of an asset over its entire life including Capital,
Maintenance and Disposal Expenditure.
− Capital Expenditure: Any expenditure that is used to procure or construct: a new
asset, upgrade the capability of an asset, make improvements to an asset, make
additions to an asset or replace an asset.
− Revenue/ Maintenance Expenditure: Any expenditure that allows an asset to
continue providing the agreed level of service until the end of life is reached.
− SCOTS: Society of Chief Officers of Transportation in Scotland.
− RAMP: Road Asset Management Plan.
− Road Asset: Physical item maintained by the Roads Service identified in section 2 of
the Road Asset Management Plan. 
Page 120 of 228

Page 121

ROADS ASSET MANAGEMENT POLICY V1.1 5 
POLICY DETAILS
1. Asset Planning
− Council will adopt an asset management planning approach for the management of
infrastructure assets including the application of life cycle cost analysis as advocated
in the SCOTS Asset Management Framework.
− Prior to acceptance, proposed Capital Works projects shall be subjected to technical
and life cycle cost evaluation and prioritised using predetermined criteria developed
to satisfy the goals of the Council and the RAMP. 
− Wherever possible predictive modelling will be used to develop and implement
preventative maintenance programs to ensure lowest life cycle costs. 
2. Community Expectations
− All road services will align with the Climate Change Commitment set out by North
Lanarkshire Council.
− Council will regularly review its asset inventory and identify opportunities for
rationalisation in line with community requirements. 
3. Risk Assessment and Management
− Council will maintain a programme of regular inspections of assets to minimise risk to
the community based on legislative requirements.
− The council will maintain and regularly review a Road Asset Risk Register that will
identify the risks associated with the council’s Road infrastructure and record the
controls in place to manage them.
− 
4. Asset Accounting
− Council will maintain asset registers to the level of detail required to meet the
requirements of the NLC RAMP.
− Useful service life shall be determined and given to each asset group / type or
component based on past experience and current benchmarked standards.
− Annual Depreciation costs will be reported annually with gross replacement and
depreciated replacement cost figures. 
Page 121 of 228

Page 122

ROADS ASSET MANAGEMENT POLICY V1.1 6 
5. Budget Allocation
− The council budgets for Roads including the funding for all asset construction,
maintenance, rehabilitation and replacement shall be guided by Council’s RAMP.
− The capital and revenue programmes will be reviewed as required taking into account
the status of each asset and the level of service desired.
− A rolling 5-year programme of proposed capital works will be developed linked to the
Road Asset Management Plan and long-term financial plans. 
6. Road Asset Management Plan
− Council will further develop the RAMP covering all the councils Road Assets including
carriageways, footways, street lighting, structures, traffic signals and street furniture.
− The Asset Management Plan sets out for each asset group/type:
o Predicted future changes in demand and Levels of service required.
o The investment required in the maintenance, renewal and replacement of
assets required to meet the levels of service.
o Methods of performance monitoring and appraisal.
o Financial projections and the risks associated with the plan. 
7. Road Maintenance Manual
− The council will develop a manual detailing how Road maintenance is carried out.  
− The Road maintenance manual will define how and when we:
o Inspect, categorise and prioritise reactive repairs.
o Assess condition, identify and prioritise sites for renewal or replacement.
o Choose the materials used and prepare works programmes.
o Procure, manage works, record and report costs.
o Record and respond to customer contacts.
Page 122 of 228

Page 123

ROADS ASSET MANAGEMENT POLICY V1.1 7 
8. Reporting
− The council will develop condition and option reports as required to support future
capital bids.
− A revised asset management plan will be developed to support future capital
programmes.
− Annual performance reports on the major asset groups will be submitted to
Committee. 
9. Roles And Responsibilities 
Council
− To act as custodians of community assets.
− To set corporate asset management policy with linkage to The Plan for North
Lanarkshire 2021.
− To set agreed Levels of Service and Levels of Acceptable Risk.
− To allocate budgets to achieve the levels set.
− To ensure appropriate resources for Asset Management activities are made available. 
Chief Executive Officer / Executive Team
− To provide strategic direction and leadership.
− To ensure there is continuous improvement in asset management.
− To ensure accurate and reliable asset information is presented to Council. 
Managers and Staff
− To implement the Asset management policy and plan with agreed resources.
− To develop and implement improvement plans for individual asset groups.
− To develop and implement Maintenance and Capital Works programs in accordance
with Asset Management Plan and budgets.
− To deliver levels of service to agreed risk and cost standards. 
Page 123 of 228

Page 124

N
ROADS ASSET MANAGEMENT
PLAN V2.03
NORTH LANARKSHIRE COUNCIL 
VERSION 2.03 APRIL 2026 
Page 124 of 228

Page 125

2 
Table of Contents
Foreword ............................................................................................................................................................................................................................................................. 5
Document Control & Council Approval ........................................................................................................................................................................................................... 6
Responsibility for the Plan ................................................................................................................................................................................................................................ 6
The responsibility for the delivery of and updating of this plan are shown below: .......................................................................................................................... 6
1. Introduction ........................................................................................................................................................................................................................................... 7
1.1 Overview ............................................................................................................................................................................................................................................ 7
1.2 Purpose ............................................................................................................................................................................................................................................. 7
1.3 RAMP and Other Plans .................................................................................................................................................................................................................... 8 
........................................................................................................................................................................................................................................................................... 8 
........................................................................................................................................................................................................................................................................... 8
2 Road Assets ................................................................................................................................................................................................................................................. 9
2.1 Road Assets covered by the RAMP ................................................................................................................................................................................................ 9
2.2 Inventory Data .................................................................................................................................................................................................................................. 9
3 Customer Expectations ........................................................................................................................................................................................................................... 10
3.1 Introduction ................................................................................................................................................................................................................................... 10
3.2 Key Stakeholders ........................................................................................................................................................................................................................... 12
3.2.1 List of Stakeholders .................................................................................................................................................................................................................. 12
3.3 Information Publication ............................................................................................................................................................................................................... 13
3.3.1 Freedom of Information (FOI) requests ................................................................................................................................................................................. 13
3.3.2 Other recurring queries ........................................................................................................................................................................................................... 13
3.4 Communications Channels and Processes................................................................................................................................................................................ 13
3.4.1 Online – Council Website ......................................................................................................................................................................................................... 14
Page 125 of 228

Page 126

3 
3.4.2 Reporting of Issues ................................................................................................................................................................................................................... 14
3.4.3 Collecting Feedback .................................................................................................................................................................................................................. 14
4 Our Road Asset Management Objectives ............................................................................................................................................................................................. 15
5 Demands ................................................................................................................................................................................................................................................... 16
5.1 Asset Growth ................................................................................................................................................................................................................................. 16
5.2 Traffic Growth and Composition ................................................................................................................................................................................................. 16
5.3 Environmental Conditions ........................................................................................................................................................................................................... 16
5.4 People and Competency .............................................................................................................................................................................................................. 18
6 Service Standards .................................................................................................................................................................................................................................... 19
6.1 SCOTS CORE PERFORMANCE INDICATORS ................................................................................................................................................................................ 19
6.2 Performance Management .......................................................................................................................................................................................................... 21
7 Financial Summary .................................................................................................................................................................................................................................. 22
7.1 Asset Valuation .............................................................................................................................................................................................................................. 22
7.2 Planned Funding ........................................................................................................................................................................................................................... 23
8 Asset Investment Strategies ................................................................................................................................................................................................................... 24
8.1 Investment between Asset Types ............................................................................................................................................................................................... 24
8.2 Carriageways Investment Strategy ............................................................................................................................................................................................. 26
8.3 Footways Investment Strategy .................................................................................................................................................................................................... 27
8.4 Carriageway and Footway Strategy Overview ........................................................................................................................................................................... 27
8.5 Street Lighting Investment Strategy ........................................................................................................................................................................................... 28
8.6 Structures Investment Strategy ................................................................................................................................................................................................... 29
8.7 Traffic Signals ................................................................................................................................................................................................................................. 30
8.8 Street Furniture ............................................................................................................................................................................................................................. 32
9 Risk Management .................................................................................................................................................................................................................................... 33
Page 126 of 228

Page 127

4 
9.1 Approach ........................................................................................................................................................................................................................................ 33
9.2 Scenario Likelihood ....................................................................................................................................................................................................................... 33
9.3 Risk Consequence ......................................................................................................................................................................................................................... 33
9.4 Risk Evaluation ............................................................................................................................................................................................................................... 35
10 Risks ..................................................................................................................................................................................................................................................... 36 
Page 127 of 228

Page 128

5 
Foreword
The public road network in North Lanarkshire is the council’s largest and most visible community asset, with a gross replacement value of more than £3
billion. It is used every day by our residents and businesses, and it plays a crucial role in supporting The Plan for North Lanarkshire, which guides our collective
direction. This includes our partners, stakeholders and most importantly our diverse communities and the people who live, learn, work, invest and visit here. 
Given its importance, it is essential that this asset is effectively managed, maintained and enhanced. The Roads Asset Management Plan (RAMP) supports
this by providing a strategic framework for how resources are allocated, prioritised and applied to the management of our road infrastructure. 
Our aim is to deliver a network that is safe, reliable, and fit for purpose both now and in the long term. Achieving this requires a balance between routine
maintenance, targeted renewal, and strategic improvement. It also demands a commitment to continuous improvement, ensuring that our practices evolve
in response to climate change, technological advancements, and the changing needs of our communities. 
Through this plan, we reaffirm our commitment to responsible asset stewardship, value for money, and delivering a high‑quality roads and infrastructure
network that supports the well‑being and prosperity of all who rely on it. We look forward to working with partners, stakeholders, and our communities as
we implement this plan and work towards a more connected, sustainable, and resilient future. 
Councillor Helen Loughran   
Convenor of Environment & Climate Change 
Lyall Rennie
Chief Officer (Community Operations) 
Pamela Humphries
Chief Officer (Place) 
Page 128 of 228

Page 129

6 
Document Control & Council Approval
Document Control
Version Number / Date Approved by Council
V2.03 Approved by Environment & Climate Change Committee April 2026      
Next Update Due Date
Responsibility for the Plan
The responsibility for the delivery of and updating of this plan are shown below:
Council Officer Responsible for
Scott Walker (Roads & Assets Services), 
Stewart Barr (Infrastructure Manager)
Informed Decision making and identifying where improvements to the service can
be made.
Paul Mahoney (Asset Services Manager)  Ensuring the RAMP is updated and suitable Data management and work
programming procedures are implemented.
Mamadou Jalloh (Strategy Team Leader)
Elaine Nicol (Roads Maintenance Manager)
Gary Wood (Transportation Manager)
John Scott (Engineering Manager)
Ensuring the RAMP continues to be aligned to operational requirements.
Page 129 of 228

Page 130

7 
1. Introduction
1.1 Overview
Our Road Asset Management Policy confirms our commitment to asset management and
aligns our approach with the Council’s Corporate Asset Strategy and the SCOTS Road Asset
Management Framework of Recommended Practices. 
This Asset Management Plan links to the Council’s Corporate Asset Management Plan and
translates the corporate objectives into clear, concise, and aligned road asset management
objectives. Additionally, this Plan also provides high-level strategies that direct and support
the development of the individual asset-specific maintenance process and procedures. 
This Road & Asset Management Plan (RAMP) outlines the council’s overall strategy and its
intentions for how to manage the local road network to achieve asset management
objectives. This plan considers stakeholder expectations, existing and future projected
demands on the road assets, anticipated resources, and risks, to deliver service standards
which provide the greatest benefit against our objectives and strategic outcomes. 
The RAMP sets out North Lanarkshire
Council’s plans for the Road Assets for the
period 2026-2030. The RAMP defines the
Council’s plans for the maintenance of the
“Road Asset” which comprises of
carriageways, footways, structures, street
lighting, traffic management and street
furniture. 
1.2 Purpose
The purpose of RAMP is to: 
 Formalise strategies for investment in road asset groups. 
 Define service standards. 
 Improve how the road asset is managed. 
 Enable a better value for money road service to be delivered. 
Page 130 of 228

Page 131

8 
1.3 RAMP and Other Plans
The Road Asset Management Plan relates to other National, Regional and Council plans as
illustrated below: 
National
Transport  
Strategic
Transport    
National Code of Practice
– Well Maintained   
Regional
Economic  
Regional
Transport  
NLC Priorities
and  
NLC Active
Travel Strategy 
NLC Roads and
Infrastructure Service  
North Lanarkshire Council Road Asset Management Plan 
THE PLAN FOR
NORTH
LANARKSHIRE
Page 131 of 228

Page 132

9 
2 Road Assets 
2.1 Road Assets covered by the RAMP 
2.2 Inventory Data
This plan is based upon currently available inventory data for road assets, i.e. carriageway,
structures, street lighting, and traffic signals. Footway and street furniture is based on an
estimated inventory. Also, for some minor road assets inventory data is not currently held,
however, an attempt has been made to incorporate these assets within this plan using local
estimates and sample surveys.
A plan to improve asset data forms part of the council’s Road Asset Data Management Plan
Carriageways 1,671 kilometres (9.2 million square metres) 
Footways 2,613 kilometres 
Footpaths 617km 
Structures 541 no. 
Street Lighting Columns 64,330 no. 
Illuminated Signs 2,772 no. 
Illuminated Bollards 658 no. 
Traffic Management Systems 65 Controlled Junctions
182 Signalised Pedestrian Crossings 
Grit Bins 2,924 no. 
Weather Stations 5 no. 
The Plan also covers the
following assets which are
estimated where data is
available.
Road Drainage Assets (Drainage systems, Gullies, Ditches, Trash
Screens, etc)
Non-illuminated Signs (7,205 no.)
Non-illuminated Bollards (658 no.)
Pedestrian Barriers (10,247 ln m)
Safety Fences (circa 84.7km)
Street Name Plates (8,242 no.) 
Verge Marker Posts (168 no.)                                                    
Bus Shelters (666 no.)                                                           
Electric Car Charging Points (97 no.) 
The RAMP covers the Council assets that are maintained by Roads or Infrastructure Service and are directly
linked to the Public Road network. There are many other similar assets that are owned by the Council but are
the responsibility of other Council departments and therefore are not covered in this RAMP, e.g. non-public
car parks, private bridges, core paths, public rights of way and water related infrastructure that does not
form part of the road network.
Page 132 of 228

Page 133

10 
3 Customer Expectations 
3.1 Introduction 
There has been an increasing interest in how local government can improve both its customer
focus and customer relations. A key to this is an understanding of what drives customer
satisfaction, this would enable the Council to prioritise investment in service improvements
based on their likely impact on customer satisfaction. However, this is a difficult task as the
improvements the public have experienced in other areas of the private sector has led to rising
expectations in the services the Council provides, and therefore there are major challenges in
meeting those expectations. Our aim is to provide as much of a positive customer experience
as possible. 
The information above details the number of enquiries received by the service throughout
2025. Each enquiry is assessed and inspected by one of our 12 road inspectors or 3 lighting
inspectors. Where defects are identified that meet the relevant criteria and associated risk level,
instructions are issued to our contractor in line with our Risk Based Approach. This Policy also
sets out the Service’s safety inspection strategy, ensuring all priority routes are inspected
monthly and all residential roads are inspected at least once each year. 
Effective asset management relies heavily on managing expectations. To illustrate the scale of
the challenge in maintaining the road network, it is worth noting that carriageway widths
typically range from around 5.5 m on residential streets to approximately 7.3 m on
higher‑speed principal routes. Even applying the minimum width of 5.5 m across our 1,670 km
of adopted carriageway results in an estimated 9.2 million square metres of road surface that
the service is responsible for maintaining. 
The cost of reactive maintenance (e.g. responding to an individual pothole) is far greater per
square metre than planned activities such as resurfacing a section of road. Reactive repairs
deliver poorer long-term value and contribute to a cycle of repeat interventions, hence the 
Enquiries
Received 
During 2025
Asset Type Number of
Enquiries
Carriageways / Potholes 3219
Drainage / Flooding 1515
Footways / Potholes 1117
Street Furniture 838
Street Lighting 2003
Vegetation 191
Winter 374
Page 133 of 228

Page 134

11 
Service is focused on reducing the volume of reactive works and prioritising planned,
preventative schemes. Planned resurfacing offers greater efficiency, longer asset life, and
better value for money. 
Public‑facing communications will primarily be delivered through the Council’s website. For a
number of Roads‑related functions, customers will be able to access programme information
for specific road activities. However, it is recognised that the current approach to
communicating Roads activities can be improved to better meet the needs of our communities
and stakeholders. 
Improved communication is essential to engaging effectively with all stakeholders and
gathering meaningful customer intelligence that can be used to enhance our services.
Strengthening how we communicate will also help build stronger relationships with key
partners and make it easier for people to understand what we do and how we do it. Clear,
accessible information supports the achievement of our organisational objectives and helps
demonstrate value for money. 
Enhancing communication will also ensure that up‑to‑date information on Roads activities, such
as when and where works are taking place and how long they will last, is readily available. It
allows us to explain why road works are necessary and the methods used to carry them out,
helping to demonstrate the success and value of the service. Ultimately, better communication
will ensure people remain well‑informed and will help challenge and change any negative
perceptions of the Roads Service. 
The Council works hard to ensure that local people, businesses, stakeholders and partners are
informed about the detail of any work on their doorstep. A range of communication tools are
used to ensure people are kept informed about what is happening and when it is happening. 
 Communications / Social media (X (Twitter)) 
 Advance warning signs for roadworks
 Roads Asset Management Plan  
 North Lanarkshire Council Website  
Page 134 of 228

Page 135

12 
3.2 Key Stakeholders 
Identification of key stakeholders is essentially for effective asset management communication;
it is necessary to identify not just what you are communicating but also with who. Stakeholder
lists have been split into internal and external stakeholders. 
3.2.1 List of Stakeholders 
 Table 3.1 – List of Internal Stakeholders 
 Table 3.2 – List of External Stakeholders 
Internal Stakeholder(s) Responsibility / influence 
Council / Elected Members Ultimate decision making
Council Leader Decision making
Portfolio Holder Portfolio responsibility and decision making
Chief Executive / Depute Chief
Executive / Chief Officers
Decision making
Managers Decision making & Connections between
Services
Team Leaders Lead delivery and implementation 
Team Members Delivery of service
Finance / Legal / HR Team Specialist advice / reporting
Communications Team Information sharing and promotion
Transport Scotland Community Groups / Community Councils
North Lanarkshire residents Bus Operators
Non-resident road users Glasgow Bus Partnership
Business community Network Rail
Neighbouring authorities Scottish Canals
Strathclyde Passenger
Transport (SPT)
Scottish Water
Glasgow City Region Partners 
Page 135 of 228

Page 136

13 
3.3 Information Publication 
The Council publish annual performance reports covering Council services as a whole. As part
of this some road indicators are included such as: 
o Condition of roads and pavements 
o Information of additional funding received 
o Customer satisfaction 
In addition to this to ensure both ease of update and transparency of figures annual asset
performance reports are produced as part of the RAMP. More information can be found in
section 6 of this Plan (Service Standards). 
3.3.1 Freedom of Information (FOI) requests 
Where FOI requests for similar subjects recur, the aim is to produce these are readily
available frequently available datasets. This has the advantage of both time saved by The
Council and quicker access to data for requestors.
3.3.2 Other recurring queries 
Other queries and recurring requests are also considered for information publication or
even clarifying of existing data provided. A prime example on this is the process of
prioritising planned maintenance (for example resurfacing). The current revision of the
RAMP has separated this into its own section with clear, detailed information on how we
select works to be undertaken. This is present in section 7 of the RAMP (Forward Works
Programme and Prioritisation). 
3.4 Communications Channels and Processes 
The council recognises the diverse needs across different stakeholder groups and aspires to
provide data and information in formats that are relevant to need. 
Effective communication and coordination of road works are essential to maintaining a safe,
efficient, and reliable road network. As a local authority, we have statutory duties under the
New Roads and Street Works Act (NRSWA) to plan, manage, and supervise works on the public
road in a way that minimises disruption, protects public safety, and ensures that all undertakers
meet required standards. This includes responsibilities for noticing, inspecting, coordinating
works between utilities and contractors, and ensuring reinstatements are completed to the
correct specification. 
The Scottish Road Works Commissioner oversees compliance with these duties, promoting
good practice, monitoring performance, and ensuring that all works are properly recorded and
managed. The Commissioner’s national coordination platform Road Works Scotland provides
a single, transparent portal for registering, coordinating, and reviewing road works activity. By
Page 136 of 228

Page 137

14 
using this system effectively, we support better planning, reduce conflicts and congestion,
improve communication with stakeholders, and uphold our legal obligations while delivering a
well-managed, accountable road network for our communities. 
3.4.1 Online – Council Website 
The Council website contains a large variety of information relating to Roads in general
within the area. These include (but are not limited to): 
o Gritting and Winter Service 
o Regulation and Enforcement 
o Street lighting and traffic signals 
o Road safety.
3.4.2 Reporting of Issues 
Stakeholders can report issues online through the website or over the phone. Roads
issues are logged in our asset management system and safety inspectors are assigned to
investigate and raise works orders where necessary. An emergency out-of-hours service is
also available. 
3.4.3 Collecting Feedback 
The Council collect feedback in a variety of formats, each webpage has a feedback option
at the bottom of the page to collect stakeholder feedback and improvements are
implemented when necessary. 
We are also initiating new ways of connecting with customers after the submission of
requests and the completion of roadworks.
This data is processed annually to see how we are performing against national and
regional averages, more information on how we use this data is available in section 6 of
the HIAMP (Performance Monitoring and Strategic Objectives).  
Page 137 of 228

Page 138

15 
4 Our Road Asset Management Objectives 
Our Asset Management Objectives support the alignment with The Plan for North Lanarkshire
and provides direction for the implementation of Asset Management Practices across the Roads
Service. 
The Asset Management Objectives support the Road Service to: 
o Measure Performance
o Communicate decision risks and opportunities
o Provide a consistent approach to managing the asset
Environmental 
Long-term option and planning analysis to minimise the environmental of impacts of maintenance. 
Safety
Provide a safe network for all road users through the continuous refinement of the authority’s intelligence-
led approach. 
Healthier 
Promote the healthier travel options through the provision of maintenance that priorities pedestrians and
cyclists. 
Customer Engagement 
Engage with customers to understand their needs, priorities, and expectations to support the development
of service standards and improve customer satisfaction.
Page 138 of 228

Page 139

16 
5 Demands 
5.1 Asset Growth
The asset grows each year due to the adoption of new Roads and construction of new Road
links.  Over the last 5 years (excluding Covid period) the following additional assets have been
adopted by the council:
− Carriageways 35 km
− Footways  60 km 
− Street Lighting 3,500
New assets create the need for maintenance, management and associated funding in future
years as these additional assets age.  This is particularly relevant to street lighting as energy
costs increase immediately exacerbating the effect of rising energy prices. 
5.2 Traffic Growth and Composition
Traffic over the last 15 years has increased
considerably, placing increasing pressure
on the Road network due to a significant
increase in the general volume of traffic
and in particular, large commercial
vehicles. Data from Transport Scotland
shows that total vehicle kilometres across
all North Lanarkshire Council roads in
2023/24 was comparable to pre-pandemic
levels. 
SPT’s study Freight Strategy for Strathclyde dated January 2017 highlights that 3,205 goods
vehicles were registered within North Lanarkshire.  This represents 10.92% of all registered
goods vehicles in Scotland 29.8% of all registered goods vehicles within the Strathclyde area. 
Many of the council’s roads were not originally designed to accommodate this volume of
traffic or the increased demands posed by heavier electric vehicles. With the level of proposed
development over the next 5 years, an increase in traffic is inevitable. This will contribute to
the accelerated wear and tear of the road assets and means increased levels of maintenance
will be required in future. As a result, there is an escalating need for additional investment. 
5.3 Environmental Conditions
Pressure on the road asset continues to escalate due to a range of changing environmental
conditions, including:
Page 139 of 228

Page 140

17 
 Winter weather: Although the effect of climate change has in recent years seen milder
winters, it is predicted that we are also likely to experience more severe events. The
effects on our road condition can be significant with major damage to road surfaces. 
 Flooding: Certain areas are
susceptible to flooding, and recent
events have resulted in significant
impacts on the road network. 
 Rainfall intensity: climate change is
changing weather patterns resulting
in more intense rainfall in localised
areas. 
 Warmer Summers: recent warmer
summers have caused roads to melt,
with excess bitumen bleeding to the road surface and increasing the likelihood of
deformation defects (such as rutting) occurring, preventing the road surface from draining
effectively. 
These environmental pressures are driving a need to review investment and revise service
standards to reflect what is affordable, unless further funding is made available. 
Live Labs 2
North Lanarkshire Council is a lead authority in ADEPT’s Live Labs 2: Decarbonising Local Roads,
a UK‑wide £30m programme funded by the Department for Transport. NLC leads the North
Campus of the Centre of Excellence for Decarbonising Roads (CEDR). 
NLC’s leadership role in Live Labs 2 positions the council at the forefront of UK roads
decarbonisation. Through innovation trials, cross‑sector collaboration, formal evaluation
frameworks, and SME engagement, NLC is generating robust evidence to support low‑carbon
materials and methods across all stages of the road asset lifecycle. This work will directly inform
future maintenance strategies, investment planning, lifecycle modelling, and sustainability
commitments within the Roads Asset Management Plan. 
Page 140 of 228

Page 141

18 
5.4 People and Competency
The Roads Service continues to operate under significant and ongoing pressure as it responds
to changing demands on the road network alongside constrained resources. Our highly trained,
experienced, and competent officers work diligently to prioritise, manage, and deliver essential
services that support both organisational priorities and the objectives of the RAMP. 
However, without sufficient resourcing and effective workforce planning, the service faces
increased risk of negative impacts on its ability to:
 contribute effectively to the Corporate Plan and wider strategic aims.
 Deliver the Asset Management Plan and
associated objectives.
 Maintain operational resilience.
 Adapt to emerging and future challenges. •
 Drive service improvements.
 Support robust succession planning across key
roles.
The Service continues to investigate the use of new technologies, such as digital surveys and AI to
support our existing resources. 
Page 141 of 228

Page 142

19 
6 Service Standards 
This Plan is based upon delivering the service standards indicated below.  The standards reflect
the funding levels in section 7 and reflect the standards that Service users can expect from the
Council’s Road assets during the Plan period. Details of how the specific measures shown below
are calculated are included in the Road maintenance manual. 
6.1 SCOTS CORE PERFORMANCE INDICATORS 
North Lanarkshire Council has set Service Standards aligned to the following key performance
indicators defined by SCOTS Performance Group and forms part of the annual Performance
Management Recommended Practice. 
Carriageways 2023/24 2024/25 Target 
Safety
Percentage of Cat 1 defects made safe within
response times. (* digital data disrupted
during mobilisation)
89% 95%* 100%
Percentage of Cat 2 defects made safe within
response times.
93% 84%* 95%
Percentage of safety inspections completed
against target times
94% 90% 95% 
Condition
Percentage of “A” Class road network which
has been assessed as ‘consider for
maintenance treatment’.
23.8% 23.6% 30%
Percentage of “B” Class road network which
has been assessed as ‘consider for
maintenance treatment’.
31.0% 28.8% 30%
Percentage of “C” Class road which has been
assessed as ‘consider for maintenance
treatment’.
31.1% 30.4% 30%
Percentage of unclassified, non-principal
Road’s network which has been assessed as
‘maintenance should be considered’.
34.6% 33.2% 35%
Length (km) of carriageway treated 1.9% 1.7% 2.5%     
Page 142 of 228

Page 143

20 
Footways 2023/24 2024/25 Target
Safety Percentage of Cat 1 defects made safe within
response times. (* digital data disrupted
during mobilisation)
86% 94%* 100%
Percentage of Cat 2 defects made safe within
response times.
90% 87%* 90%
Percentage of safety inspections completed
against target times
83% 93% 90%
Condition Length (km) of footway to be considered for
maintenance treatment  
N/A
Trial
Underway 
Length (km) of footway treated 0.2% 0.3% 0.5%     
Street Lighting 2023/24 2024/25 Target
Safety Percentage of Cat 1 defects made safe within
response times. (* digital data disrupted
during mobilisation)
94% 95%* 100%
Percentage of Cat 2 defects made safe within
response times.
97% 91%* 95%
Condition Percentage street lighting columns that are
over 40 years old (**Note 2023/24 was
measured as over 30 years old)
13.4% 18.5% **30%
Environment Average annual electricity consumption per
Streetlight (kWh) 
195.3 188.1 200     
Page 143 of 228

Page 144

21 
Structures 2023/24 2024/25 Target
Safety Percentage of principal inspections carried
out on time
100% 100% 100%
Percentage of general inspections carried out
on time
100% 100% 100%
Condition Bridge Stock Condition Indicator (BCIav) 85 84.2 90%
Bridge Stock Condition Index (BCIcrit) 68.5 67.9 80%     
Traffic Signals   
Resilience
Percentage of signalised junctions with LED
aspects
100% 100% 100%
Percentage of signalised crossings with LED
aspects
100% 100% 100%
Condition
Percentage of signalised junction controllers
within life expectancy (20 years)
98.4% 100% 100%
Percentage of signalised crossing controllers
within life expectancy (20 years)
100% 100% 100% 
6.2 Performance Management 
In addition to measuring our performance via the SCOTS & APSE process the service also
monitors our performance through the Roads & Infrastructure Contract Performance
Management regime. This allows us to report regularly on our performance against specific
targets within the Performance Handbook for each period and ensure actions are taken as soon
as possible to address in concerns. 
Most of the asset management performance data is updated annually, while other Roads and
Transportation data is updated monthly or quarterly. Information will be available internally
and will be reported to Committee through the Roads & Infrastructure Contract cyclic reports.  
Page 144 of 228

Page 145

22 
7 Financial Summary
7.1 Asset Valuation
The Asset Valuation figures provide a financial report of the Road asset. The Gross
Replacement Cost (GRC) represents how much it would cost to construct the Road
Infrastructure from a green field site utilising modern materials, technologies, and techniques
(Modern Equivalent Asset – MEA)
The depreciated replacement cost (DRC) illustrates
the extent to which the asset has been consumed (used
up). 
The annualised depreciation cost (ADC) represents
the average annual investment required in planned
maintenance (renewal of the asset) required to maintain
the asset.  Comparing the annual capital investment
against this figure provides an indication of whether long
term funding needs are being met (or not). 
As at 2025 the Road asset is valued as follows:
Asset Value and Depreciation
Asset Type 
Gross Replacement
Cost (GRC) £’000
Depreciated
Replacement Cost
(DRC) £’000
Annualised
Depreciation
Cost (ADC) £’000
Comments
Carriageways £1,961,120 £1,552,486 £36,788 
Footways &
Cycleways £552,708 £337,657 £9,890 
Structures £592,145 £581,369 £10,776 
Street
Lighting £293,361 £142,348 £7,382 
Street
Furniture £43,435 £21,820 £2,261 
Traffic
Signals £15,490  £7,745 £1,033 
Traffic
Management £9,721 £6,325 £415 
Land £1,115,409   
Total £4,583,389,000 £2,642,005,000 £68,545,000 
Page 145 of 228

Page 146

23 
7.2 Planned Funding
The service standard targets shown in section 5 are based upon the following funding levels. 
The funding for years 1 -3 is based upon the approved short-term budget as confirmed by the
council .
Funding beyond year 3 shown is indicative to allow the prediction of long-term condition.  It has
been assumed that a level of funding similar to current funding levels (the average of the last 3
years) will be provided.  Any changes to these funding predictions in the future will require an
update of this RAMP. Detailed figures will be provided in future reports.   
Asset Works Funding Allocated
£k
Long Term
Annual
Funding
Required £k
2025-2026 2026-2027 2027-2028 2028 +
Carriageways Reactive £3,460 £3,460 £3,460 
Planned £7,010 £6,370 £6,410 
Footways Reactive £1,159 £1,200 £1,200 
Planned £1,408 £1,250  £1,260 
Structures 
(Note: this
does not
include
allowances for
bridge
renewals)
Reactive £47 £55 £55 
Planned  £1,782 £1,755 £1,755 
Street
Lighting
Energy
Costs £2,728 £TBC £TBC 
Reactive £1,040 £1,040 £1,040 
Planned £2,661 £2,660 £2,771 
Traffic
Signals
Energy
Costs
Included in Street Lighting Energy Costs
Reactive £149 £150 £150 
Planned £500 £500 £500 
Page 146 of 228

Page 147

24 
Asset Works Funding Allocated
£k
Long Term
Annual
Funding
Required £k
2025-2026 2026-2027 2027-2028 2028 +
Street
Furniture Reactive  £567   
Planned £128   
8 Asset Investment Strategies
The service is actively exploring the use of artificial intelligence and advanced digital solutions
to enhance the management of the public road carriageway network. We aim to introduce more
accurate, data‑driven approaches to condition assessment, defect identification, deterioration
modelling, and investment planning. These technologies have the potential to significantly
improve the consistency and efficiency of inspections, provide predictive insights to support
earlier and more cost‑effective interventions, and strengthen the overall evidence base for
asset management decisions. This work forms part of our wider commitment to modernising
operational practices and ensuring that resources are targeted where they will deliver the
greatest benefit to the network and local communities.
The strategies in this section are being developed using predictions of future condition over a
20-year period.  The predictions enable strategies to be created to look at the whole life cost of
maintaining the asset.  Using long term predictions means that decisions about funding levels
can be taken with due consideration of the future maintenance funding liabilities that are being
created. Investment strategies for the major asset types are summarised below.  These
strategies are designed to enable the service standards in section 6 to be delivered. 
8.1 Investment between Asset Types
While analysis in ongoing, initial indications estimate that in comparison to historical
investment, future investment is planned to be:
− Carriageways:  level of Capital investment will require to increase to maintain a steady
state. 
− Footways:  level of Capital investment may require to increase slightly. 
− Structures: level of Capital investment maintained at similar levels (Assuming that any
future bridge replacement is funded separately when the need is identified). 
− Street lighting; level of Capital investment is insufficient to maintain the asset. Increased
investment required. 
Page 147 of 228

Page 148

25 
− Traffic signals; level of Capital investment may require to increase to maintain a steady
state. 
It is recognised that the Service is undergoing measures of efficiency savings. Generally, asset
types depreciate slowly over a long period and therefore short periods of funding restrictions
may not impact significantly on the overall condition of the asset. However, continued reduced
investment would be detrimental to the condition of the Asset.  
Page 148 of 228

Page 149

26 
8.2 Carriageways Investment Strategy   
Category Description Basis of Strategy
Routine and
Reactive
Repair
Repair of defect to
current intervention
standards and
response times.
The strategy emphasises the importance of delivering
works on a planned basis wherever possible, thereby
reducing dependence on reactive interventions. This
approach is underpinned by the Risk‑Based Safety
Inspection regime and informed by intelligence
gathered through routine inspections and customer
reports. 
In parallel, the Service is working with Hochtief to
introduce more innovative and sustainable methods
for pothole repair, although it is recognised that
temporary repairs will remain necessary in certain
circumstances. 
From Autumn 2026, the Service will implement a
programme of planned patching ahead of winter to
build resilience within the network. In addition, the
availability of hotboxes will be brought forward earlier
in the winter season to strengthen reactive repair
capacity and improve overall response times.
Preventative
Maintenance 
A programme of
preventative
treatment or Roads
in the initial stages
of deterioration. 
The strategy proposes applying low-cost preventative
treatments (such as surface dressing or rejuvenation)
at an early stage, before roads deteriorate to a point
where more extensive and costly repairs are required.
While current investment levels are not expected to
fully prevent some decline in overall network condition,
the targeted use of appropriate preventative
treatments will minimise deterioration and help
maximise the value and effectiveness of available
funding.
Planned
Maintenance
Corrective
Programme of
resurfacing where a
preventative
treatment cannot
be applied
Where road surfaces have deteriorated to a level that
only full resurfacing can provide a long‑term solution,
these locations will be prioritised through the condition
assessment process. Sites that cannot be addressed
within current funding allocations will continue to be
managed safely through interim measures until
additional resources become available. 
Page 149 of 228

Page 150

27 
8.3 Footways Investment Strategy
Category Description Basis of Strategy
Routine and
Reactive
Repair
Repair of defect to
current
intervention
standards and
response times.
The strategy emphasises the importance of delivering works on a
planned basis wherever possible, thereby reducing dependence
on reactive interventions. This approach is underpinned by the
Risk‑Based Safety Inspection regime and informed by intelligence
gathered through routine inspections and customer reports. 
In parallel, the Service is working with Hochtief to introduce more
innovative and sustainable methods for pothole repair, although
it is recognised that temporary repairs will remain necessary in
certain circumstances. 
Planned
Maintenance
Corrective
Programme of
resurfacing/renewal
of footways.
The current level of investment is not expected to fully prevent
some deterioration in footway condition; however, the targeted
use of appropriate corrective maintenance treatments will help
minimise the extent of decline and ensure resources are directed
to where they will have the greatest impact. 
8.4 Carriageway and Footway Strategy Overview
The investment level is not sufficient to address all locations in need of resurfacing. As part of
the SCOTS Roads Asset Management team a series of cost and condition projection tools have
been developed for carriageways. This tool allows authorities to analyse what impact the
current level of investment will have on the condition of their carriageway asset over the longer
term. 
The SCOTS Road Condition Assessments is a collaborative project to aid authorities to evaluate
the condition of their carriageway assets. National road condition assessments are undertaken
each year using specialist vehicles equipped with lasers and high resolution cameras. 
The collected data is assessed, and a Road Condition
Indicator (RCI) score assigned to both each 
road classification and the overall network. The RCI score
indicates the percentage of the road 
network in need of maintenance. Unfortunately, this
service is not provided for any other assets. 
Each Road classification is further broken down into one
of three categories;
 Green – where the road is generally in a good condition
 Amber – where the road shows deterioration requiring investigation
 Red – where the road is poor overall and maintenance is required 
Page 150 of 228

Page 151

28 
Our most recent condition assessment results for 2024/26 are shown below :- 
The current RCI of 31.3 is a slight improvement from the 2023/25 RCI - 32.6. The strategy
currently aims to maintain the network in a steady-state condition. Work is ongoing to develop
a condition indicator for the footpath network with significant trials of digital surveys completed
in Cumbernauld. 
8.5 Street Lighting Investment Strategy
Category Description Basis of Strategy
Routine and
Reactive Repair
Repair of defect to
current intervention
standards and
response times.
The completion of the lantern replacement programme
with modern LED equivalent should be fully completed in
26/27. 
The street lighting maintenance regime aims to maximise
planned work and reduce reliance on reactive repairs
wherever possible. Planned activities will be informed by
the programme of routine structural and electrical testing,
ensuring that maintenance is scheduled based on asset
condition and risk. The Roads Street Lighting team will
continue to respond to individual fault reports in line with
agreed service timescales. 
Where inspection findings identify an immediate safety
concern, urgent action may be required, including the
removal of lighting columns or the temporary
disconnection of units. In such cases, there may be
unavoidable delays before replacement lighting can be
installed, depending on the availability of resources,
materials, and funding.
Planned
Maintenance
Corrective
Programme of
structural renewal
Planned column replacements are undertaken annually
based on the age, condition and fault levels prioritised by
risk. 
A significant number of street lighting columns are now
exceeding their service life. Additional investment is
required to maintain this asset group. 
Road Classification Percentage
Red
Percentage
Amber
Percentage
Green
RCI
A Class 2.97 20.64 76.39 23.6
B Class 3.72 25.03 71.25 28.8
C Class 3.58 26.86 69.56 30.4
Unclassified 5.03 28.13 66.84 33.2
Overall Network 4.47 26.85 68.68 31.3
Page 151 of 228

Page 152

29 
The table below identifies the number of lighting columns that have exceeded their anticipated
service life, along with an indicative cost for their replacement. Although these columns are
beyond their nominal design lifespan, they continue to function effectively although some are
now showing signs of deterioration. 
Height No of Columns Overhead Lines Replacement Cost
Estimate
<=6m 9801 524 £5,390,550
8m 2257 651 £1,410,625
10m 787 63 £550,900
12m 15  £10,500 
12860 1238 £7,362,575 
8.6 Structures Investment Strategy
Category Description Basis of Strategy
Routine and
Reactive
Repair
Repair of defect to
current intervention
standards and
response times.
The strategy requires deploying works contractors,
primarily the Council’s term service contractor, to carry
out emergency repairs as well as non-emergency
maintenance. The need for these works will be identified
through general and principal bridge inspections, along
with notifications and reports of bridge strikes or other
structural damage. 
Strengthening
(council
structures)
Strengthening of
bridges currently
assessed as being
weak. 
Strengthening of bridges will primarily be driven by
regular structural reviews and bridge assessments as the
need arises.   
Refurbishment Refurbishment of
structures that have
deteriorated into a
poor or very poor
condition.
- The strategy involves intervening to repair the
following assets that are in poor condition or make
safety critical or accessibility improvements. Road
bridges
- Footbridges
- Culverts 
- Retaining walls
- High Mast Lights
- Subways/Underpasses
This work will be informed by findings from inspections
and assessments. Prioritisation of works will be based
Page 152 of 228

Page 153

30 
on several factors, including bridge condition
indicators and the strategic importance of the route.
- 
Parapet works Strengthening or
replacement of weak
parapets
This work will be informed by findings from inspections
and assessments. Prioritisation of works will be based
on several factors, including bridge condition
indicators and the strategic importance of the route. 
Scour
Protection
Scour protection
works on structures
susceptible to scour
This activity will be driven primarily by Level 1 and Level
2 scour assessments, along with findings from
inspections, which identify scour risk and recommended
work. 
The structures investment strategy allows the council to fulfil its statutory obligations and
makes allowance for safety critical repairs and improvements. Any major bridge replacements
would require additional funding after the need is identified.   
8.7 Traffic Signals
Category Description Basis of Strategy
Routine and
Reactive Repair
Repair of defect to
current intervention
standards and
response times.
The strategy requires the deployment of works
gangs/other agencies on emergency repairs and on
other non-emergency repairs. 
Refurbishment
of signalised
junctions
Refurbishment of
junctions that have
deteriorated or the
equipment has
become
obsolete/unreliable
Prioritise investment on signalised junctions outwith
life expectancy period (20 years). Other factors which
may also need to be considered include annual fault
history, spare part availability, power efficiency, traffic
sensitivity, available budgets and funding 
Refurbishment
of signalised
crossings
Refurbishment of
crossings that have
deteriorated or the
equipment has
become
obsolete/unreliable
Prioritise investment on signalised crossings outwith
life expectancy period (20 years). Other factors which
may also need to be considered include annual fault
history, spare part availability, power efficiency, traffic
sensitivity, available budgets and funding 
Page 153 of 228

Page 154

31 
Page 154 of 228

Page 155

32 
8.8 Street Furniture
Category Description Basis of Strategy
Routine and
Reactive Repair
Repair of defect to
current intervention
standards and
response times.
Defects are recorded via reports from the Public or
identified during other operations. Response times
are set dependent on nature of the defect. Works are
undertaken by our term maintenance contractor.
Planned
Maintenance
Corrective
Programme of
renewal /
replacements
Larger assets shall be targeted for replacement based
on available funding, demand and condition. A
prioritisation process requires to be developed. 
Page 155 of 228

Page 156

33 
9 Risk Management
9.1 Approach
Any scenarios impacting the delivery of this Road Asset Management Plan and its Asset
Management Objectives will be assessed utilising the following outlined approach. All identified
scenarios must be assessed to determine their significance, reviewing the likelihood of the
scenario occurring and the most probable (not worst possible) consequence to the delivery of
the RAM Plan and Objectives should the scenario occur. 
9.2 Scenario Likelihood 
The scenario likelihood is assessed with regard to how probable a scenario is of occurring, for
example, if the Council Roads Service is allocated its budget on an Annual Basis, the likelihood
of the risk of receiving lower budgets than levels assumed in when developing the Strategy is
Possible, due to the chance of the budget being adjusted annually.
The likelihood of a scenario occurring, within the established context, will be assessed on a scale
of Remote to Almost Certain using the following descriptors: 
Likelihood /
Probability Likelihood Description
Almost Certain Will undoubtedly happen Daily
Likely Will probably happen, but not persistent  Monthly
Possible May happen occasionally Annually
Unlikely Not expected to happen, but it is
possible 10 Years
Remote Improbable 20 Years 
9.3 Risk Consequence
The scenario consequence is assessed by considering the most probable (NOT worst possible)
outcome (impact) should the scenario occur and will be determined on a scale of Negligible to
Catastrophic as follows: 
Page 156 of 228

Page 157

34 
Table 2  Consequence (Impact/Severity) Score
Consequence
(Impact / Severity)
Description
Impact on Asset Management / Service
Objectives
Financial Impact Impact on people Impact on Reputation
Catastrophic Unable to function / inability to fulfil objectives Severe 
financial loss Death Highly damaging, sever loss of public
confidence
Major Significant impact on delivery of objectives Major 
financial loss Extensive injury, major permanent harm Major adverse publicity, major loss of
confidence
Moderate Service objectives partially achievable Significant 
financial loss
Medical treatment required, semi-
permanent harm 
up to 1 year
Some adverse publicity, legal
implications
Minor Minor impact on service objectives Moderate
financial loss
First aid treatment, non-permanent harm
up to 1 month
Some public embarrassment, no
damage to reputation
Negligible Minimal impact, no service disruption Minimal
financial loss No obvious harm/injury No interest to the press, internal only 
The scenarios considered within the RIAM Plan are primarily focused on the delivery of the Plan and Objectives, however the scenarios
can still have impacts on financials, people, and reputation; all aspects should be considered ensuring that all angles are thought through. 
Page 157 of 228

Page 158

35 
9.4 Risk Evaluation
The risk factor for a particular scenario is determined utilising the likelihood and consequence as shown in the risk matrix, table 3: 
Table 3 - Risk Matrix
Consequence Negligible  Minor Moderate Major  Catastrophic 
Likelihood
Remote  Very Low  Very Low  Very Low  Very Low  Medium
Unlikely  Very Low  Very Low  Low  Low  Medium
Possible  Very Low  Low  Low  Medium  High
Likely  Very Low  Low  Medium  High  Very High
Almost Certain  Very Low  Medium  High  Very High  Very High 
Page 158 of 228

Page 159

Roads Asset Management Plan V2.03  36
10 Risks
The risks that could prevent achievement of the standards specified in this plan (section 6) are:
Risk Id
Context Risk Risk Mitigation Monitors
Scenario
Description
Likelihood
Consequence
Rating
Treatment
Likelihood
Consequence
Rating
1 The plan is based
upon current and
historical asset
data trends. 
Where limited
data was
available,
assumptions have
been made by
experienced and
competent
officers.
Levels of Service
unattainable due to
unforeseen adverse
weather, causing
accelerated
deterioration of the
Road assets.
Possible
Major
M
edium
Review and
update
deterioration
models, plus
revise options
analysis to assess
impacts and
adjust plan
accordingly. 
Roads Business
Continuity Plan
regularly
reviewed.
Possible
Moderate
Low 
Page 159 of 228

Page 160

Roads Asset Management Plan V2.03   37
Risk Id
Context Risk Risk Mitigation Monitors
Scenario
Description
Likelihood
Consequence
Rating
Treatment
Likelihood
Consequence
Rating
2 Available budgets
have been
assumed as
shown in section
8.
Actual funding levels
differ to assumed levels
Likely
Moderate
M
edium
Review and
update
deterioration
models, plus
revise options
analysis to assess
impacts and
adjust plan
accordingly.
Possible
Moderate
Low
• 5-year budget
trends
3 Construction
inflation 
Inflation significantly
above average levels.
Likely
Major
High
Revise options
analysis based on
new rates, assess
impacts, and
adjust plan
accordingly.
Possible
Major
M
edium
• 5-year average
Inflation rate
• Projected
inflation rates
(Gulf Conflict)
Page 160 of 228

Page 161

Roads Asset Management Plan V2.03   38
Risk Id
Context Risk Risk Mitigation Monitors
Scenario
Description
Likelihood
Consequence
Rating
Treatment
Likelihood
Consequence
Rating
4 Resources are
available to
support the
delivery of the
Asset
Management
Plan.
Pressures on resources
mean that staff focused
on service delivery and
Asset Management
becomes a ‘nice-to-
have’. Likely
Major
High
Organisation’s
commitment to
provide the
resources to
support and
improve Road
Asset
Management
across the
service.
Unlikely
Major
Low
• Number of Full-
Time Equivalent
Asset
Management
Positions
Page 161 of 228

Page 162

Roads Asset Management Plan V2.03   39
Risk Id
Context Risk Risk Mitigation Monitors
Scenario
Description
Likelihood
Consequence
Rating
Treatment
Likelihood
Consequence
Rating
5 Staff have the
skills, experience,
and competences
to deliver the
Road Asset
Management
Plan.
Lack of succession
planning and
competence
framework, in
combination with
reorganisation,
restructuring and cost
saving exercises, plus
an aging workforce,
meaning the loss of
experienced/competent
staff.
Likely
Major
High
a. Strategic
workforce
plan
b. Support via
supply chain.
c. Develop and
implement
succession
plan.
d. Report staff
competence
levels and
risks, as part
of ASOR.
Unlikely
Major
Low
• Staff competence
level quantities
• Staff age group
demographics
Page 162 of 228

Page 163

Roads Asset Management Plan V2.03   40
Risk Id
Context Risk Risk Mitigation Monitors
Scenario
Description
Likelihood
Consequence
Rating
Treatment
Likelihood
Consequence
Rating
6 Delivery of the
service is aligned
with RIAM Plan.
Service delivery
activities are either not
documented or of
insufficient detail,
preventing the
consistent delivery of
activities, plus the
review and alignment of
activities with RAM Plan.
Variable – individually assessed
Variable – individually assessed
Variable – individually assessed
Prioritise
documenting
activities based
on risk, utilising
the SCOTS
Recommended
Practices Task 5 –
Maintenance
Manual
templates.
Possible
Variable – individually assessed
Low
or M
edium
• % of activities
documented
that are
assessed to be
medium risk or
higher.
• % of
documented
activities that
have been
reviewed
against current
RAM Plan.
Page 163 of 228

Page 164

Roads Asset Management Plan V2.03   41
Risk Id
Context Risk Risk Mitigation Monitors
Scenario
Description
Likelihood
Consequence
Rating
Treatment
Likelihood
Consequence
Rating
7 Maintenance Manual
process and
procedures are not
followed when service
delivery activities are
carried out. Likely
Moderate
M
edium
Undertake
routine auditing
of process and
procedures,
based on risk of
non-compliance
for each process
and procedure.
Unlikely
Moderate
Low
• % of audits
completed
within
timescales.
• Number of
Corrective
Actions
Requests in the
last 12 months.
8 Embedment of
Road Asset
Management
across the service.
Asset Management is
perceived as a bolt-on
to “normal day job”
and/or tick box
exercise. Possible
Moderate
M
edium
Regular
stakeholder
communication
and engagement,
e.g.  forums,
meetings, and
training.
Unlikely
Moderate
Low
• % of staff
achieved SCOTS
RAM
Fundamentals
certificate
• Number of
RAMP meetings 
Page 164 of 228

Page 165

North Lanarkshire Council
Report
Environment and Climate Change Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    LR/SW Date 29/04/26 
Electric Vehicle Charging Infrastructure Update April 2026
Transfer of Asset Ownership 
From  Lyall Rennie, Chief Officer (Community Operations)  
E-mail renniely@northlan.gov.uk   
Executive Summary 
This report presents Elected Members with a summary of the progress made to date on
the Glasgow City Region Electric Vehicle Charging Infrastructure (EVCI) project and
provides an update on the process to engage a commercial charge point operator (CPO)
to expand the network of electric vehicle charging infrastructure (EVCI) across North
Lanarkshire. 
Recommendations 
It is recommended that the Environment and Climate Change Committee: 
(1) Acknowledge the content of the report; and; 
(2) Approve the future Transfer of Ownership of the existing North Lanarkshire EV
charging infrastructure (as listed in Appendix 1) to the new Charge Point Operator as
part of the new Contract.  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (5) Grow and improve the sustainability and diversity of North
Lanarkshire's economy
Programme of Work Sustainable Futures
Page 165 of 228

Page 166

1. Background 
1.1 The full background to the Glasgow City Region Electric Vehicle Charging
Infrastructure (EVCI) project and details on the work undertaken to date can be found
within previous reports submitted and approved at Environment & Climate Change
Committees on: 
Electric Vehicle Charging Infrastructure Report 1 May 2024 
Electrical Vehicle Charging Infrastructure Update 2025/26 29 October 2025 
1.2 On the 13 February 2024, the Glasgow City Region Cabinet endorsed the Preferred
Way Forward with the Project Management Officer and the Member Authorities (MAs)
collaborating to procure a Charge Point Operator (CPO) to expand the Electric Vehicle
Charging Infrastructure. 
1.3 The MAs entered into an Inter-Authority Agreement (“IAA”) which came into effect on 
3rd October 2024. This IAA appointed Glasgow City Council as Lead Authority, acting 
on behalf of MAs, with responsibility to conduct and manage the procurement process 
for the appointment of a CPO up to (and including) contract award. 
1.4 Glasgow City Council issued a Prior Information Notice (PIN) to potential suppliers in
April 2025 to gather feedback on the draft project specification. When the PIN closed
on 12 May there was a clear indication of strong market interest in the project from
CPOs. 
1.5 The Publication of Concessions Notice (PCN) & Pre-selection to Participate (ITP) was
issued in December 2025. 
2. Report 
Progress since last Report to Committee 
2.1  Glasgow City Council (GCC) have commenced the procurement activity to appoint the
CPO on behalf of all Eight Member Authorities using the procedure of Competitive
Procedure with Negotiation 
2.2  The indicative programme for the procurement is set out below. A strong response was
received to the IPT and the Project Procurement Team are currently evaluating the
initial submissions. 
Timescale Stage
December 2025 Publication of Concession Notice & Pre - selection Invitation to
Participate (ITP) stage 
The ITP was published for a 30-day period and included the pre-
selection criteria (technical/professional capability, economic financial
standing). 
3 February 2026 Deadline for ITP Responses
February – early
March 
ITP Evaluation Period – the evaluation of the ITP submissions and
shortlisting of five bidders to be invited to next stage of the
procurement process.
January - March Drafting of Procurement and Contract Documents
March Procurement and Contract Documents shared with GCR MAs for
comment.
Page 166 of 228

Page 167

April – late June Invitation to Tender (ITT) stage – The full technical, legal and
commercial package will be issued to shortlisted bidders.  This will
include the: 
• detailed specification;
• the contract terms and conditions; and 
• the award criteria/weightings.
Early June – late
August 
Evaluation of Initial Bids - Upon receipt and successful evaluation of
Initial bids, GCC reserves the right of awarding the contract without
undertaking any negotiations.
TBC Negotiation Phase - If no bids meet the requirements, GCC may
undertake to negotiate with bidders prior to inviting the next stage of
bids so that a winning tender can be identified.
If necessary, the process of negotiation and further bid submissions
can continue until a winning tender is identified.  This flexibility will be
built into the programme.
Late September
2026 (assuming
no requirement for
negotiation)
Award stage - Once a preferred bidder has been identified and GCC
committee approval granted, GCC will move to the standstill period
and contract award. 
2.3  The projected timescales for the project will vary depending on the progress of the
procurement process and whether there is a requirement to negotiate with suppliers. 
2.4  The programme in relation to the extension of the CPS back-office system offered two
scenarios. The scenario which does not require supplier negotiation indicates: 
• Contract Award:  September 2026 
• Completion of Migration of Existing Assets:  End of November 2026. 
2.5 GCR PMO has advised that should supplier negotiation be required, then a further
extension into early 2027 will be required. 
Transfer of Assets  
2.6 In order to participate in the Glasgow City Region Electric Vehicle Project, North
Lanarkshire Council proposes to transfer ownership of its existing electric vehicle
chargepoints to the new chargepoint operator who will be appointed to as the
Concessionaire, to own, maintain, operate and provide back office services for the
network within Glasgow City Region. 
2.7 North Lanarkshire seeks delegated authority for the Depute Chief Executive to
authorise the transfer the ownership of existing chargepoint assets following contract
award.  The transfer of assets will take place in a phased approach immediately after
the contract has been signed between Glasgow City Council, as the Lead Authority,
and the Concessionaire and will migrate the chargepoints from the existing Charge
Place Scotland system and onto a new back office service. 
2.8 This will include transferring ownership of all of the equipment associated with the EV
charger, including: feeder pillar, local connection assets (the electrical and
communications connection from the Electrical Feeder Pillar up to the EV Charger),
cabling and any associated equipment (i.e. battery) required to operate the EV Charger. 
Page 167 of 228

Page 168

2.9 The estimated value of the existing assets (including depreciation) has been modelled
in a consistent way across the Glasgow City Region member authorities using the
approach set out below. 
2.10 A standard, high-level cost for different charger types is set out below: 
7kW Cost (AC) £2,000.00
22kW Cost (AC) £3,000.00
50kW Cost (DC) £20,000.00 
2.11. These costs do not include the below ground infrastructure and civils costs of creating
the asset. However, these elements have no market value in that they cannot be resold
and the value should instead be regarded as part of the land for which a concessionaire
will tender. 
2.12 For depreciation purposes a straight-line model has been used which would assume a
15-year lifespan for an AC device and 10 years for a DC device.   
2.13 The GCR PMO have used these costs and depreciation assumptions, to model the
value of the chargepoints over the period from the year that the device was installed
through to the end of March 2027.  This provides a total value for North Lanarkshire
Council’s 130 no. existing assets at £466,200. 
2.14 It should be recognised the calculation of the value of existing assets does not take into
account technological advances and user expectations which have not remained static.
It may also be the case that a number of devices will be regarded as having nil book
value due to outdated operating systems, incompatibility with modern requirements and
difficulties with maintenance.   
2.15 North Lanarkshire Council will grant a Licence to Occupy to the Concessionaire for
each EV charger location. This will allow the Concessionaire to use the location for the
existing or any replacement EV Charging Equipment. Ownership of Equipment itself
transfers to the Concessionaire under the Contract both to transfer responsibility for the
Equipment to it and also to allow it to remove and replace the Equipment in accordance
with the Contract. 
Next steps 
2.16  The immediate next steps will include: 
a) Continuing the procurement process and finalisation of technical documents. 
b) Continuation of the work to complete certificate of title for the existing and new EVCI 
sites. 
2.17 Information on existing NLC-owned charge points currently operated by our provider is
available on Charge Place Scotland and listed in Appendix 1. Appendix 2 lists the car
park sites being considered for the next phase of charge point installations, scheduled
to begin in 2027. 
3. Measures of success 
3.1 The delivery of electric vehicle charging infrastructure across North Lanarkshire and 
the wider Glasgow City Region which allows the transformative shift to net zero 
Page 168 of 228

Page 169

emission vehicles which in turn will contribute to delivery of the council’s net zero
ambition. 
4. Supporting documentation 
Appendix 1 – Existing EV ChargePoint Sites.
Appendix 2 – Proposed EV Chargepoint sites (Phase 1). 
Lyall Rennie
Chief Officer (Community Operations) 
Page 169 of 228

Page 170

5. Impacts
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The transfer of assets has been highlighted to colleagues within Finance. This has
no direct financial impact but does affect accounting practices. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 170 of 228

Page 171

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles
from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐  
Page 171 of 228

Page 172

Appendix 1 – Existing EV ChargePoint Sites 
CPID Name/Location Postcode
50259 Watersports Centre, Strathclyde Country Park, Motherwell ML1 3ED
50260 Watersports Centre, Strathclyde Country Park, Motherwell ML1 3ED
50611 Croy Park & Ride, Croy, Glasgow G65 9HT
50652
Newhouse Car Park, Edinburgh Road, M8 Junction 6, Newhouse,
Motherwell ML1 5SY
51004 Greenfaulds Park and Ride, Cumbernauld G67 2XJ
51209 Blair Road Park & Ride, Coatbridge ML5 1NQ
51497 Croy Park & Ride, Croy, Glasgow G65 9HA
53054 Strathclyde Park Charging Hub ML1 3RT
53055 Strathclyde Park Charging Hub ML1 3RT
53056 Strathclyde Park Charging Hub ML1 3RT
53057 Strathclyde Park Charging Hub ML1 3RT
53120 Strathclyde Park Charging Hub ML1 3RT
53121 Strathclyde Park Charging Hub ML1 3RT
53250 Wishaw Sports Centre ML2 0HF
53251 Wishaw Sports Centre ML2 0HF
53252 Wishaw Sports Centre ML2 0HF
53253 Wishaw Sports Centre ML2 0HF
53254 Wishaw Sports Centre ML2 0HF
53263 King Street, Coatbridge ML5 1JE
53264 King Street, Coatbridge ML5 1JE
53265 King Street, Coatbridge ML5 1JE
53268 Burngreen Park, Kilsyth G65 0HT
53269 Burngreen Park, Kilsyth G65 0HT
53312 Drumgelloch Railway Station, Airdrie ML6 7BL
53313 Drumgelloch Railway Station, Airdrie ML6 7BL
53314 Drumgelloch Railway Station, Airdrie ML6 7BL
53315 Drumgelloch Railway Station, Airdrie ML6 7BL
53316 Drumgelloch Railway Station, Airdrie ML6 7BL
53330 The Time Capsule ML5 1DW
53331 The Time Capsule ML5 1DW
53332 The Time Capsule ML5 1DW
53333 The Time Capsule ML5 1DW
53334 The Time Capsule ML5 1DW
53414 Aquatec, Motherwell ML1 1AZ
53415 Aquatec, Motherwell ML1 1AZ
53416 Aquatec, Motherwell ML1 1AZ
53417 Aquatec, Motherwell ML1 1AZ
53418 Aquatec, Motherwell ML1 1AZ
53494 Shotts Library ML7 5EX
53495 Shotts Library ML7 5EX
53496 Shotts Library ML7 5EX
53579 Broadwood Stadium G68 9NE
53580 Broadwood Stadium G68 9NE
Page 172 of 228

Page 173

53581 Broadwood Stadium G68 9NE
53582 Broadwood Stadium G68 9NE
53583 Broadwood Stadium G68 9NE
53584 Broadwood Stadium G68 9NE
53585 Pivot Centre G69 0DL
53586 Pivot Centre G69 0DL
53587 Pivot Centre G69 0DL
53588 Pivot Centre G69 0DL
53589 Drumpellier Country Park ML5 2EH
53590 Drumpellier Country Park ML5 2EH
53591 Drumpellier Country Park ML5 2EH
53592 Cairnhill Road ML6 9BT
53593 Cairnhill Road ML6 9BT
53594 Cairnhill Road ML6 9BT
53595 Cairnhill Road ML6 9BT
53596 Cairnhill Road ML6 9BT
53597 Cairnhill Road ML6 9BT
53598 Cairnhill Road ML6 9BT
53599 Cairnhill Road ML6 9BT
53600 Hallcraig Street ML6 6AW
53601 Hallcraig Street ML6 6AW
53602 Hallcraig Street ML6 6AW
53701 Muirfield Centre G67 1AG
53702 Muirfield Centre G67 1AG
53703 Muirfield Centre G67 1AA
53796 Harthill Park & Ride ML7 5SD
53797 Harthill Park & Ride ML7 5SD
53798 Harthill Park & Ride ML7 5SD
53799 Harthill Park & Ride ML7 5SD
53800 Harthill Park & Ride ML7 5SD
53819 Burnhead Street G71 5AT
53820 Burnhead Street G71 5AT
53821 Burnhead Street G71 5AT
53822 Burnhead Street G71 5AT
53936 Stepps - Blenheim Avenue G33 6HN
53937 Stepps - Blenheim Avenue G33 6HN
53938 Stepps - Blenheim Avenue G33 6HN
53939 Stepps - Blenheim Avenue G33 6HN
54007 Newhouse Park & Ride ML1 5GH
54008 Newhouse Park & Ride ML1 5GH
54009 Newhouse Park & Ride ML1 5GH
54010 Ravenwood G67 1LA
54011 Ravenwood G67 1LA
54012 Ravenwood G67 1LA
54017 Bellshill ,Caledonian Avenue, Nobles View & West End Drive ML4 3AS
54039 The Wynd G67 2SU
Page 173 of 228

Page 174

54040 The Wynd G67 2ST
54041 The Wynd G67 2RX
54042 Shotts Community Centre ML7 5ET
54043 Shotts Community Centre ML7 5ET
54148 Bellshill ,Caledonian Avenue, Nobles View & West End Drive ML4 3AP
54267 Glebe Street ML4 3DQ
54268 Glebe Street ML4 3DQ
60070 Strathclyde Park ML1 3ED
60071 Strathclyde Park ML1 3ED
60072 Strathclyde Park ML1 3ED
60073 Strathclyde Park ML1 3ED
60732 McConville Court ML4 2UG
60733 McConville Court ML4 2UG
60745 Plains,Park Place, Plains 
60908 Chryston Community Hub G69 4DB
60910 Lindsaybeg Road Charger G69 9DQ
61028 Chryston Community Hub G69 4DB
61029 Chryston Community Hub G69 4DB
61114 Burnhall Place, Wishaw ML2 8EE
61414 Dryburgh Gardens ML2 7JB
61415 Dryburgh Gardens ML2 7JB
61416 Lismore Drive ML5 5FP
61417 Lismore Drive ML5 5FP
61418 Lismore Drive ML5 5FP
61711 Newmains & St Brigids ML2 9DH
61712 Newmains & St Brigids ML2 9DH
61713 Newmains & St Brigids ML2 9DH
61714 Newmains & St Brigids ML2 9DH
62033 Dykehead Road ML6 6EX
62653 Dykehead Road, Airdrie ML6 6EX
62678 Dykehead Road, Airdrie ML6 6EX
62679 Dykehead Road, Airdrie 
62688 Dykehead Road, Airdrie 
62689 Dykehead Road, Airdrie ML6 6EX
62698 Dykehead Road, Airdrie ML6 6EX
62699 Dykehead Road, Airdrie FK2 7EN
N/A Heritage Centre Car Park, Elm Street, Motherwell 
N/A Bellshill Park & Ride 
N/A Airdrie Road Car Park, Kilsyth 
CPID_ 12
Riverbank Community Hub, 1 Paddock Street,
Coatbridge ML5 4PG ML5 4PG
NCPID_
13
Riverbank Community Hub, 1 Paddock Street,
Coatbridge ML5 4PG ML5 4PG  
Page 174 of 228

Page 175

Appendix 2 – Proposed EV Chargepoint sites (Phase 1) 
Name Easting Northing Postcode Type
Airdrie Leisure Centre 277271 666067 ML6 7HU
Car
Park
Banton Community Hall 275007 679132 G65 0QN
Car
Park
Gartlea Community Centre 276977 664737 ML6 9PB
Car
Park
Kilsyth Swimming Pool 271479 678010 G65 9JE
Car
Park
Langmuirhead Road, Auchinloch 266076 670831 G66 5DG
Car
Park
The Safety Zone Community Centre 270104 664105 G69 7SN
Car
Park
BOWLING GREEN STREET 273975 660374 ML4 1HT
Car
Park
JOHN STREET (WEST) 273318 660198 ML4 1RJ
Car
Park
MACDONALD STREET 275600 656508 ML1 1XD
Car
Park
CALLON STREET 276217 665293 ML6 6BW
Car
Park
HIGH ROAD (SOUTH) 274988 656994 ML1 3DA
Car
Park
HIGH STREET 276004 665628 ML6 6JF
Car
Park
BAIRD STREET (South) 273105 665193 ML5 3AW
Car
Park
WHIFFLET STREET 273646 664037 ML5 4ER
Car
Park
POLLOCK STREET 1 275241 657246 ML1 1JE
Car
Park
POLLOCK STREET 3 275154 657229 ML1 1BS
Car
Park
BLAIRGROVE 272517 664810 ML5 1ET
Car
Park
MAIN ROAD ( CONDORRAT SOCIAL CLUB ) 273547 673291 G67 4BT
Car
Park
KIRK ROAD 279840 655224 ML2 7BT
Car
Park
THE WYND/SMITHYENDS 276748 676144 G67 2RX
Car
Park
AIRDRIE ROAD 271710 677877 G65 0NQ
Car
Park
KING STREET SOUTH 271826 677880 G65 0AW
Car
Park
KING STREET (North) 271804 677940 G65 0AJ
Car
Park
Page 175 of 228

Page 176

WISHAW STATION (South) 279173 654853 ML2 0EX
Car
Park
Motherwell Station Park & Ride (East) Muir St 275046 657291 ML1 1DG
Car
Park
Motherwell Station Park & Ride (West) High St 274934 657070 ML1 3GZ
Car
Park
BAIRD STREET (North) 273094 665246 ML5 3DH
Car
Park
EAST ACADEMY STREET 279755 654855 ML2 8FB
Car
Park
SHOTTS STATION Park & Ride FOUNDARY RD 287355 659774 ML7 4BJ
Car
Park
CROY STATION PARK & RIDE 272977 675330 G68 9FA
Car
Park
JOHN STREET (EAST) 273404 660201 ML4 1AB
Car
Park
HOZIER STREET 273560 663935 ML5 4EJ
Car
Park
Community Centre, Monkland View Crescent,
Bargeddie 270113 664092 G69 7RY
Car
Park 
Page 176 of 228

Page 177

North Lanarkshire Council
Report
Environment & Climate Change Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    JMcK/LS Date 29/04/26 
North Lanarkshire’s Path to Net Zero (2045) 
From  James McKinstry, Chief Officer (Assets & Procurement)  
E-mail mckinstryj@northlan.gov.uk   
Executive Summary 
The purpose of this report is to bring before the Environment & Climate Change Committee
a replacement for our current Climate Plan ACT2030 (2021-2030), our Path to Net Zero
(2045) which provides detail on the revised Council position in relation to our climate
emissions and the work that the Council has to do to address the Scottish Government’s
new carbon budgets. These budgets have been set to 2045 however this first edition of our
Path to Net Zero (2045) considers the first of these which is set for 2030 at 57% reduction
from baseline. Progress against the 5-year budget will be monitored annually via thematic
(buildings, waste and fleet) reduction targets. 
Our annual Public Sector Climate Duties Report was presented to cycle 1 (2026) of this
Committee and showed that the Council has reduced its emissions by 51.2%.  Following
on from our previous climate plan, the Path to Net Zero (2045) continues the strategic
climate change journey for the Council ensuring it meets its statutory duties which is
primarily to: 
• Mitigate emissions;
• Adapt to climate impacts; and
• Act sustainably. 
Our Path to Net Zero (2045) introduces a strategic climate vision for the Council that will
prioritise Scope 1 (emissions where the Council owns or operates the source) and Scope
2 (indirect emissions that arise through the generation of the energy we use), recognising
the Council’s ability to reduce these. 
The Vision aligns itself with the Scottish Government’s 2045 target for net zero emissions
and takes account of the Scotland’s Draft Climate Plan: 2026-2040 published in November
2025 which incorporates the carbon budgets set within the Climate Change (Scotland) Act
2009 (Scottish Carbon Budgets) Amendment Regulations 2025. The incremental thematic
milestones contained within the Path to Net Zero (2045) will support progress towards this,
reflecting statutory responsibilities as well as internal ambition along with aligning to the
national Scotland’s Climate Change Plan. 
The estimated cost, at today’s prices, of delivering a full Path to Net Zero (2045) for the
Council is in excess of £3 billion. 
Page 177 of 228

Page 178

1. Background 
1.1 The Council’s previous Climate Plan was approved at Committee in February 2022 and
was the vehicle for demonstrating the Council’s commitment to the Council Motion of
June 2019 where a ‘Climate Emergency’ was declared. The motion was in line with the
Paris Agreement (2015) where nations were encouraged to reduce emissions as much
as possible by 2030.
1.2 A series of thematic carbon budgets with annual targets was set across the Council to
help drive reductions as shown in the table below. These were based on planned
project activity from, for example, the Council’s capital plan at that time and therefore
were SMART (Specific, Measurable, Achievable, Relevant and Timebound).
Table 1 Thematic Targets (2021-2026) – Climate Plan ACT2030                
Buildings Transport Waste Annual Emissions Target Target Reduction from baseline
2021/22 49,205 5,973 12,133 67,311 42.5%
2022/23 46,745 5,855 12,133 64,733 44.7%
2023/24 44,408 5,737 12,133 62,278 46.8%
2024/25 42,187 5,619 10,355 58,161 50.3%
2025/26 40,078 5,501 10,355 55,934 52.2% 
The report also provides detail of a new tool, Climate View, which the Council services can
use to model our actions and how they impact on our carbon emissions. Presentations will
be given to the Council management team on this tool during cycle 2, 2026. 
Recommendations
It is recommended that the Environment and Climate Change Committee: 
(1) Approve the strategic vision contained within the Path to Net Zero (2045).
(2) Endorse the adoption of the Scottish Government carbon budgets and application
to the Council’s baseline year (2015/16).
(3) Review and adopt the contents of the Path to Net Zero (2045) as the Council’s
new climate plan.
(4) Accept that going forward the Path to Net Zero (2045) will be strengthened
through an on-going review process.
(5) Endorse the use of ClimateView by the Council services to map the impact of
climate action and track greenhouse gas emissions in North Lanarkshire.
(6) Recognise the financial challenge of delivering net zero emissions and the need
to keep future budget allocations under review. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work All Programmes of Work
Page 178 of 228

Page 179

1.3 Whilst the original projects have been subject to change over the years, the Council
has made good progress to remain on track for meeting the targets and budgets set as
shown in the table below.
Table 2 Reported Council Emissions (2016-2025)
2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25
117,075 112,341 121,723 97,900 77,113 59,852 62,770 61,909  61,773   57,147 
Emission
reductions from
baseline
-4,734 4,648 -19,175 -39,962 -57,223 -54,305 -55,166 -55,302  -59,928 
% change from
baseline
-4.0% 4.0% -16.4% -34.1% -48.9% -46.4% -47.1% -47.2% -51.2% 
1.4 At Policy & Strategy (March 2024) the reporting of the positive internal audit on Climate
Change (November 2023) provided the opportunity to advise Committee that it was
now an opportunity to review our Climate Plan in line with the Council’s positive
progress which had been reported to Environment & Climate Change Committee the
month before (February 2024).
1.5 The Scottish Government launched a consultation in December 2025 on Scotland’s
Draft Climate Plan (2026-2040), and so officers took the opportunity to review the
consultation and use it to finalise our Path to Net Zero (2045).
1.6 The challenges of net zero were presented to Committee such as the complexity and
significant cost and that a new climate plan, a Path to Net Zero (2045), would be
produced. 
1.7 It is worth noting at this point in this report, the definition of net zero. Net Zero does not
mean zero emissions. Net zero is where an organisation, such as the Council, aim to
reduce their emissions as much as feasible and as close to zero as possible, with any
remaining (i.e. residual) emissions absorbed by nature (such as the Woodland Carbon
Code) and/or offset by technology such as carbon capture technology. 
Figure 1 Illustration of Net Zero Emissions 
1.8 For the Council, the priority must be emission avoidance through energy efficiency and
use of low or zero carbon technology such as electric vehicles. 
National Context
1.9 The Scottish Government has stated that they remain committed to achieving net zero
greenhouse gas emissions by 2045. Scotland’s Draft Climate Change Plan was
consulted on in December 2025 and once adopted will provide a formal pathway to net
zero emissions by 2045 through key sector-specific actions. These will be supported
by carbon budgets which will enable the monitoring of emissions over five-year periods.
This is a key change in the Scottish Government’s approach.
Page 179 of 228

Page 180

1.10 A revised Heat in Buildings Bill is currently paused and will be reintroduced following
the Scottish Government election. It is likely to be more lenient in terms of polluting
heating systems whilst still focussing on the decarbonisation of heat and will exclude
minimum requirements for private landlords. 
1.11 These impending changes and existing challenges will impact on the Council’s
approach to net zero and therefore the Path to Net Zero (2045) has been developed
with this in mind. Committee will observe that it is incremental and adaptable, retaining
focus on the three themes of buildings, transport and waste via thematic carbon
budgets that combined will work to those prescribed by the Scottish Government. 
Emission Scopes 
1.12 To fully understand the content of this report Committee should bear in mind the
following definitions:
Table 3 Explanation of Emission Scopes
Scope Organisational
Control
Emission Source Example
1 Direct Stationary combustion Fuel use in buildings
Mobile Combustion Fuel use in vehicles
Process emissions Water treatment processes
Fugitive emissions Leaks of refrigerants from cooling systems
2 Indirect Purchased electricity, heat and
steam
Grid electricity use
3 Indirect Several sources Purchased goods and services
Employee commuting and business travel
Waste 
2 Report 
2.1 This report provides a summary of North Lanarkshire’s Path to Net Zero (2045), the
Council’s updated climate plan. 
Path to Net Zero (2045) 
Development 
2.2 In line with its predecessor Climate Plan ACT2030, North Lanarkshire’s Path to Net
Zero (2045)1 (Appendix 1) will continue to convey the Council’s commitment to its
statutory duties in terms of climate change. 
2.3 The actions associated with the previous Climate Plan have been reviewed and where
relevant have continued to be incorporated within the Path to Net Zero (2045).
2.4 The text that now follows, will focus on key sections within the Path to Net Zero (2045). 
1 Referred to hereon in as ‘the Path to Net Zero (2045)’
Page 180 of 228

Page 181

The Vision and Introduction 
2.5 The Path to Net Zero (2045) requires a strategic vision to aid long term planning and
decision making within the Council. The Vision recognises that achieving Net Zero is a
complex journey and is a long-term commitment that cannot be delivered by the Council
on its own. Key aspects of the Vision will: 
• Provide a clear, unequivocal, strategic direction;
• Help align Council operations, services and partnerships towards a shared goal,
facilitating consistency;
• Be a main consideration for future policy development within the Council; and
• Help attract funding as well as justify spend. 
2.6 Our Vision links in directly with the Council’s Climate Emergency Declaration of 2019
and the United Nations Sustainable Development Goals. 
North Lanarkshire (Overview) and Emissions 
2.7 This section of our Path to Net Zero (2045) starts by indicating: - the scale of the task
that is ‘Net Zero’; that we are not at the start of our journey; and we are already
witnessing climate change and experiencing its impacts. This change is ‘locked in’ and
therefore we must adjust to current and expected impacts, i.e. climate adaptation. The
section also summarises what the area-wide and organisational emissions are with the
key details shown in figures 2 and 3 respectively. 
Area-Wide Emissions 
Figure 2 NL Area-Wide Greenhouse Gases by Source (tco2e) 
2.8 Figure 2 above shows the North Lanarkshire area’s Scope 1 & 2 emissions and are as
a result of all public bodies, business and industry, agriculture and other land use, and
residents located within the area using or living in buildings, travelling and disposing of
waste. The Council via the Scottish Climate Intelligence Service (SCIS) use
ClimateView to detail the area’s emissions. At present Scope 3 emissions are
excluded.
BUILDINGS
68%
TRANSPORT
23%
WASTE
9%
We will cut greenhouse gas emissions from all council operations to net zero by 2045 for
Scope 1 and 2, and reduce Scope 3 emissions where we can. We will follow Scotland’s
carbon budgets and support a just transition for communities, businesses, and the
environment
Page 181 of 228

Page 182

2.8.1 For these emissions, the Council is able to facilitate and influence change through
activities such as, but not limited to, the Active Travel Strategy, Air Quality
Management, Capital Programme, Local Heat & Energy Efficiency Strategy and
Delivery Plan, and the Local Housing Strategy. These strategies and plans will help
bring about change that will positively impact on emissions.
North Lanarkshire Council Emissions
Figure 3 NLC’s Greenhouse Gases by Source (tco2e) 
2.9 Figure 3 shows the greenhouse gas emissions of the Council only and covers Scope
1, 2 & 3. Waste is classed as Scope 3 within this footprint as it is a source that is not
directly owned nor controlled by the Council. i.e. it is primarily others waste.
2.9.1 Figure 4 shows the Council’s Carbon boundary and illustrates what emission sources
are included within our footprint and what scope they fall under.
Figure 4 NLC’s Carbon Boundary 
BUILDINGS
68%
TRANSPORT
12%
WASTE
20%
Page 182 of 228

Page 183

2.9.2 At this point is important to note that the Council appoints from the current members a
Climate Champion to promote the work the Council does in this area and that both the
Senior and Assistant Senior Responsible Officer of the Sustainable Futures Board have
a ‘championing’ role through ensuring the progress of the relative Programme of Work.
Strategic Objectives (Targets and Key Mission Statements) 
Table 4 Thematic Carbon Budgets (2025-2030) 
Buildings Transport Waste Total
Emissions
%
Reduction
from
Baseline
Average
reduction
at end of 5-
year period
2025/26            35,811           6,777         11,718            54,306                 54% 
57%
2026/27            35,239           6,669         11,531            53,439                 54% 
2027/28            33,442           6,329         10,943            50,714                 57% 
2028/29            31,645           5,989         10,355            47,989                 59% 
2029/30            29,848           5,649           9,767            45,263                 61% 
2.10 The Council will continue to commit itself to doing its upmost to reduce the greenhouse
gas emissions its responsible for i.e. Scope 1 and Scope 2 by 94% by 2045. It will also
support area-wide decarbonisation through leadership, partnerships, and encouraging
investment within the area. Table 3 shows our updated carbon budgets going forward
to 2030. This is based on the first of the Scottish Government carbon budgets which is
set from 2025 to 2030. During 2029/2030 we will review our overall performance before
setting the next set of targets for the 2035 carbon budget which is set at 69% average
reduction over the 5-year period.
2.10.1 Our carbon budget is set against the Council’s baseline year (2015/16) allowing the
Council to continue to monitor its performance in terms of carbon reductions annually
but will also provide milestone budgets that the carbon footprint should not exceed.
Key Mission Statements
2.11 Within the Path to Net Zero (2045) we have committed to Key Mission Statements, and
these will be supported by the actions contained in the Action Plan. We will:
• Building & Energy
o Switch to cleaner energy sources for heating in our existing buildings
o Increase our use of renewables, battery storage and consider carbon capture
o Through the Tackling Poverty Strategy and the Local Housing Strategy we will
provide advice and support to local residents at risk of or in fuel poverty.
• Transport
o Continue to develop our alternative vehicle fleet through targeted investment
in light commercial vehicles, and explore alternative fuels and emerging
technologies for heavy goods vehicles where feasible
o Continue to grow our internal and public electric vehicle charging network
o Promote the use of public transport and active travel.
• Waste & Circular Economy
o Continue to improve our response to waste management and the circular
economy.
Procurement
Page 183 of 228

Page 184

2.12 Procurement will play an important role in delivering these statements whilst also
ensuring that the Council limits our scope 3 emissions that are contained within the
goods and services it purchases.
Adaptation  
2.13 The impact of climate change continues to become more apparent as well as the risk
it poses to the Council and its partners in the delivery of services. Adaptation, i.e.
becoming more climate resilient through planning for the future, is important and should
be integrated where possible in climate action. 
2.13.1 The Council’s primary focus is our response to flooding through our flood prevention
planning. The Council contributes to both Clyde and Loch Lomond and Forth Estuary
Local Flood Risk Management Plans. A Strategic Flood Risk Assessment has been
developed for North Lanarkshire, ranking areas in terms of flood risk to property. This
document allows the Council to prioritise actions to those areas at greatest risk of
flooding. 
2.13.2 The Council will continue to improve its approach to adaptation and will focus on the
national objectives contained within the Scottish National Adaptation Plan 2024-2029. 
Finance 
2.14 Financing Net Zero is one of the challenges that must be addressed. The cost of key
climate actions has been approximated within the Path to Net Zero (2045), resulting in
a total estimated cost of £3 billion to deliver Net Zero: Housing £1.95 billion, Fleet £20.8
million and, Offices and buildings £999 million. Committee should note that the values
reported here are based on current assumptions. They should be considered
provisional and may change materially as additional information emerges. 
Review and updates 
2.15 The Path to Net Zero (2045) will be reviewed on an annual basis to ensure its currency
and to monitor progress against the yearly emission reduction targets. The findings will
be reported to this Committee.
Action Plan
2.16 The action plan contains timelines, action ownership, carbon savings (where available)
and importantly, alignment with the United Nations Sustainable Development Goals.
The key actions are as follows:
• Net Zero Housing
• Community Hubs
• Capital investment in existing assets
• Fleet Decarbonisation
• Flood Protection
• Active Travel Routes
• Sustainable Procurement 
2.16.1 The Path to Net Zero (2045) actions will be subject to review and as a live document
will be subject to change through additional actions, amendment or removal of existing
ones. Each Service within the Council will have a responsibility to contribute whether
Page 184 of 228

Page 185

through delivery pr participation, consistent with delivery of the current performance of
our Climate Plan. 
Next steps: ClimateView 
2.17 Since the production of our previous Climate Plan, a new national tool ClimateView,
managed by the Scottish Climate Intelligence Service (SCIS), has been developed and
is a data-driven platform that visualises emission data, tracking progress toward climate
targets and assesses the impact of climate actions on a wider extent: jobs, health, and
vulnerable communities etc.
2.17.1 The platform provides a consistent method for reporting area-wide emissions across
Scotland and helps local authorities such as North Lanarkshire plan, monitor, and
communicate their climate strategies. Furthermore, it supports evidence-based
decision-making for reducing emissions and improving resilience.
2.17.2 The Climate & Energy Team have begun work on populating the platform and by
conclusion of this work, the Path to Net Zero (2045) will be contained within a publicly
accessible dashboard. It is anticipated that this will be available by early 2027. 
3. Measures of success 
3.1  Achieve the Carbon Budgets set within North Lanarkshire’s Path to Net Zero (2045)
4. Supporting documentation 
Appendix 1 North Lanarkshire’s Path to Net Zero (2045) 
James McKinstry
Chief Officer (Assets & Procurement) 
Page 185 of 228

Page 186

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Within our social housing, any action such as change of heating needs to be
mindful of the impact on the current and future occupants of the property in relation
to fuel poverty. The impact of this is considered within the published LHS EqIA
(18/2/26) 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
The cost of delivering Net Zero is estimated at £3 billion pounds. The Key Mission
Statements will need to be resourced over future Capital Plans. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
The Path to Net Zero (2045) is based on the Climate Change (Scotland) Act 2009
as amended and therefore not a new consideration. 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒
Page 186 of 228

Page 187

If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The successful delivery of the Path to Net Zero (2045) will positively impact on
organisational emissions – reducing them to 94% by 2045 from the 2015/16
baseline year.
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
The risks associated with Climate Change are incorporated within the Corporate
Register as well as Project Risk Registers. The Corporate Register is updated
frequently as the risk is currently perceived to be ‘High’.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 187 of 228

Page 188

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 188 of 228

Page 189

North Lanarkshire’s Path
to Net Zero (2045)  
Page 189 of 228

Page 190

Contents
Vision ................................................................................................................................ 3
Introduction ....................................................................................................................... 4
A Climate & Biodiversity Emergency ................................................................................. 4
The United Nations Sustainable Development Goals ......................................................... 5
North Lanarkshire (Overview) .............................................................................................. 6
The Plan for North Lanarkshire ......................................................................................... 6
North Lanarkshire Emissions ........................................................................................... 7
The Council’s Emissions ................................................................................................. 8
Climate Champions ........................................................................................................ 8
Strategic Climate Objectives ............................................................................................... 8
Targets ........................................................................................................................... 9
Our Key Mission Statements by 2045 .............................................................................. 10
Building & Energy ...................................................................................................................... 10
Transport.................................................................................................................................. 10
Waste & Circular Economy ........................................................................................................ 10
Procurement ............................................................................................................................ 10
Adaptation ............................................................................................................................... 10
Finance ........................................................................................................................... 11
Planned reviews and updates ............................................................................................ 12
Appendix 1 Actions ........................................................................................................... 13
Appendix 2 The Council’s Carbon Boundary ....................................................................... 22
Appendix 3 Supporting Strategies and Plans ....................................................................... 23
Appendix 4 North Lanarkshire Council ............................................................................... 24
Our Services ................................................................................................................. 24
Roles and responsibilities ............................................................................................. 25
Appendix 5 External Funding Opportunities ........................................................................ 27 
Page 190 of 228

Page 191

3 | P a g e
Vision 
We will cut greenhouse gas emissions from all council
operations to net zero by 2045 for Scope 1 and 2, and reduce
Scope 3 emissions where we can. We will follow Scotland’s
carbon budgets and support a just transition for communities,
businesses, and the environment.  
Page 191 of 228

Page 192

4 | P a g e
Introduction
The Earth’s climate has always changed because of natural causes like volcanic eruptions and
changes in the planet’s orbit. But since the Industrial Revolution (1760-1820), human activity has
caused temperatures to rise much faster than ever before. This rapid change is now affecting both
people and nature. We are seeing more extreme weather, pressure on food and water supplies, rising
sea levels, and damage to ecosystems.
Climate change is one of nine “planetary boundaries” that are limits of key earth systems that we
should not go beyond. Other boundaries include:- ocean acidification, stratospheric ozone depletion,
atmospheric aerosol loading, biosphere integrity, land use, biogeochemical flows, freshwater use and
chemical pollution (novel entities). By 2023, scientists had found that six had been breached: climate
change, biosphere integrity, land use, freshwater and biogeochemical flows. These boundaries are
linked, meaning that breaking one can make others worse. For example, climate change damages
ecosystems, which then release more carbon, further warming the planet. Human activity is pushing
the Earth toward changes that could become irreversible. Some climate impacts can no longer be
avoided, so we must adapt quickly to reduce the risks.
Scotland has taken strong action on climate change and nature loss since the Climate Change
(Scotland) Act 2009. Since our baseline year of 2015/16 North Lanarkshire Council has reduced its
greenhouse gas emissions by 51.2% as at March 2025.
A Climate & Biodiversity Emergency
The council declared a Climate Emergency in June 2019 and signed the Edinburgh Declaration on Post-
2020 Global Biodiversity Framework to support climate and biodiversity action. The council is
committed to these declarations and aside from this Path to Net Zero (2045), has other supporting
strategies and plans as seen in Appendix 3. North Lanarkshire Council recognises that the wellbeing
and prosperity of our communities depend on both reducing emissions and preparing for the changes
already happening to our weather patterns. North Lanarkshire’s Path to Net Zero (2045) is how we
intend to do this:
Figure.7.Public.Bodies.Climate.Change.Duties.in.a.North.Lanarkshire.Context 
Minimise
emissions in
North
Lanarkshire as
much as feasibly
possible
Adapt to future
changes in our
local climate to
avoid damage
and disruption
Improve our
approach to
sustainability
Page 192 of 228

Page 193

5 | P a g e
The United Nations Sustainable Development
Goals
In our action plan in Appendix 1 you will see that our actions align
with the UN’s 17 Sustainable Development Goals. We believe that
through more sustainable actions we can help deliver a just
transition to net zero. 
The United Nation’s Sustainable Development Goals (SDGs) are designed to work towards a fairer,
balanced planet through:
• Tackling hunger and poverty, ensuring everyone’s basic needs are met
• Promoting health, education and equality
• Protecting the planet through conservation, the use of sustainable resources and tackling
climate change
• Encouraging innovation, responsible consumption and production
• Promoting cooperation – globally, nationally and locally
Figure.8.Summary.of.UN҂s.Sustainable.Development.Goals1 
1 The content of this publication has not been approved by the United Nations and does not reflect the views of the United Nations or its
officials or Member States
Did you know?
A just transition refers to a fair and
inclusive approach to transitioning towards
a sustainable, low-carbon economy,
ensuring that all communities and workers
are supported throughout the process.
Page 193 of 228

Page 194

6 | P a g e
North Lanarkshire (Overview)
North Lanarkshire is located in west-central Scotland. It borders Glasgow City, East Dunbartonshire,
Falkirk, Stirling, South Lanarkshire, and West Lothian. Covering approximately 470 square kilometres, a
quarter of its land is urban however the area is rich in biodiversity, supporting diverse ecosystems and
natural habitats. It is Scotland's fourth most populated local authority area with a population of
341,691, living within 154,382 households. 
North Lanarkshire lies within the Glasgow City Region,
and experiences similar issues due to climate change
as neighbouring authorities. Climate change impacts
greatest on the most vulnerable in our society and
therefore impacts on issues such as poverty and social
inequality. Our summers will become hotter, and our
winters will have milder temperatures and will be
wetter with less chance of snow. Our summers are
traditionally a time where we use less energy however
in the event of sustained or intense heat, we will
become increasingly reliant on mechanical means to
cool. Increased rainfall may lead to more frequent
flooding impacting on homes and business. The
following impacts of climate change have been
witnessed more frequently in recent years.
• Health impacts/Heatstroke
• Availability of certain foods and increased costs
• Travel disruption
• Emergency response situations
• Loss of power supply
• Landslides
• Flooding
• Loss of biodiversity
• Increased risk of fires
• Disruption to service delivery 
The Plan for North Lanarkshire
The Plan for North Lanarkshire sets out a shared ambition to make North Lanarkshire a great place to
live, learn, work, invest in, and visit.
The Plan brings together the work of the council and its partners, helping us focus on what matters
most for local people. This work is overseen through a number of themed Boards: Brighter Futures,
Digital North Lanarkshire, Invest in North Lanarkshire, One Service, Resilient People, Sustainable
Futures, and Transforming Places.
Tackling climate change is one of our top priorities. We are working hard to:
• reduce greenhouse gas emissions,
Did you know?
That in North Lanarkshire there are: 
9 Local Nature Reserves 
3 Country Parks 
380 Sites of Importance for Nature
Conservation 
3 Special Areas for Conservation 
1 Special Protected Area 
11 Sites of Special Scientific Interest 
5 Scottish Wildlife Trust Reserves 
1 Royal Society for the Protection of
Birds Reserve
Page 194 of 228

Page 195

7 | P a g e
• use more renewable energy in our buildings and homes, and
• protect our parks, greenspaces, rivers, and lochs.
Reaching our climate goals will take new ideas, investment, and strong partnerships with communities
and organisations across the area.
Working together is essential. Through our Delivering for Communities approach, senior leaders work
closely with local community boards, making sure residents’ voices guide local climate action. This
joined-up way of working will help North Lanarkshire move towards its long-term aim of net-zero
emissions.
For information on the council and its services refer to Appendix 4. 
North Lanarkshire Emissions
Figure.9.North.Lanarkshire.Area‗Wide.Emissions
Figure 3 is a
summary of the
Scope 1 and 2
greenhouse gases
emitted in North
Lanarkshire
(explanation above). “Stationary energy” means the fuel
used to heat and power buildings. It does not include fuel
used for transport, like petrol or diesel. Most stationary
energy is used in homes, and in North Lanarkshire, 49% of
these emissions come from residential buildings. This is
why it’s important that housing is energy efficient and
moves away from gas and oil heating. 
There are more than 10,000 businesses in the area, and all
of them produce carbon emissions through their buildings,
transport, and industrial or farming activities. For transport
emissions, 97% come from vehicles on the road. To cut
these emissions, more people need to use public
transport. council plans, such as the Active Travel
Strategy, will help encourage people to change how they travel.
The carbon footprint data comes from the Scottish Climate Intelligence Service, which manages the
ClimateView tool for all Scottish councils. The tool is still being developed in Scotland, so it currently
reports only Scope 1 and Scope 2 emissions. In future, it is expected to include Scope 3 emissions as
well. For the first time, this tool allows every Scottish local authority to report its area‑wide emissions in
a consistent way. 
Did you know?
That Scope 1 & 2 emissions are those
which we have more control over. We
have focussed on tackling these types of
emissions because this is where we can
affect the most change:
• Scope 1 – heating, fuel for transport
and machinery, livestock and,
fugitive and process emissions
• Scope 2 – Purchased: electricity,
heat, steam, and cooling
Whereas Scope 3 we don’t have any
control over but is related to our daily
activities:
• Scope 3 - emissions from: producing
the goods or materials you buy,
suppliers, and waste disposal
STATIONARY
ENERGY
68%
TRANSPORT
23%
WASTE
9%
Page 195 of 228

Page 196

8 | P a g e
The Council’s Emissions
Figure 4 North Lanarkshire council’s Emissions 
The council’s greenhouse gas emissions for the 2024/25
reporting year totalled 57,155 carbon tonnes equivalent (tCO2e).
Figure 4 is a summary of the greenhouse gas inventory for the
council’s own emissions. As it is not feasible to separate the data
into council and non-council waste, we include all waste
activities, and these are recorded as scope 3 emissions.  For
further information on the council’s emission sources see Appendix 2 ‘The council’s Carbon
Boundary’.
Climate Champions
The council’s climate champion is appointed from the current serving elected members. Their role is to
influence, encourage, and support positive change. The Sustainable Futures Board’s Senior and
Assistant Senior Responsible Officer act as climate champions too by ensuring the projects within the
Programme of Work are delivered.
Strategic Climate Objectives 
The council recognises that the need for urgent action
is not solely to reduce the impact on humans. In
Scotland climate change is contributing to the decline
of native species like the Atlantic Puffin, Mountain
Hare, Great Yellow Bumblebee, and Bluebell, while
non-native species and emerging diseases (SARS,
MERS, Ebola, COVID-19) may become more common. 
By delivering the actions contained within this Path to Net Zero (2045) we will:
Reduce emissions from council operations by 94% by 2045 
As illustrated above, we will follow the Scottish Government Climate Budgets and the timeframe set.
By doing so, we will continue to improve our response to reducing carbon emissions. In order to meet
the Path to Net Zero (2045) milestones, we have set thematic targets. We have estimated that to
Net Zero
2045
(94% lower than
2015 levels)
57% lower
than 2015
levels
69% lower
than 2015
levels
80% lower
than 2015
levels
Did you know?
That the UK has a ‘watch list’ of invasive
species? The list to date includes 145 non-
native plants and animals which have been
assessed to have the ability to become
invasive. These are species that pose a risk to
biodiversity, ecosystems, human health, and
the economy.
STATIONARY
ENERGY
68%
TRANSPORT
12%
WASTE
20%
Page 196 of 228

Page 197

9 | P a g e
deliver net zero emissions will cost in excess of £5 billion. We recognise that it is going to be
challenging to reduce our emissions beyond 2035 and so we also must now look at ways to store
carbon.   Trees, depending on site and species, can provide a natural carbon store (carbon
sequestration). It takes between 31 to 46 trees to offset 1 tonne of carbon2. We have estimated that for
the council to achieve net zero emissions by 2045 we will need to plant between 217,775 and 323,150
trees, in addition to deliberate climate action to reduce our emissions.
The council does not have a direct responsibility for the overall emissions in North Lanarkshire however
we will:
Support area-wide decarbonisation through leadership,
partnerships, and encouraging climate friendly investment
We will do so through the implementation of some of the policies referred to earlier in this document
such as the Local Plan, the Active Travel Strategy and the Local Housing Strategy as well as the Local
Heat & Energy Efficiency Strategy.
Targets
In this edition of our Path to Net Zero (2045), we have set yearly targets up to 2030. These targets are
based on the Scottish Government’s goal for 2030, which is a 57% reduction in greenhouse gas
emissions compared to the baseline year. Our baseline year is 2015/16. By 2030, we aim for our 5-year
average emissions to be 50,342 tonnes of carbon equivalent. In future updates, we’ll set targets for
2035, 2040 and 2045 based on how well we perform over this 5-year period. Our action plan has been
updated in developing the Path to Net Zero (2045). (See Appendix 1).
Table.7.Thematic.Annual.Targets.(868❶‗8696) 
Buildings Transport Waste Total
Emissions
% Reduction
from
Baseline
Average
reduction at
end of 5-year
period
2025/26            35,811           6,777         11,718            54,306                 54% 
57%
2026/27            35,239           6,669         11,531            53,439                 54% 
2027/28            33,442           6,329         10,943            50,714                 57% 
2028/29            31,645           5,989         10,355            47,989                 59% 
2029/30            29,848           5,649           9,767            45,263                 61% 
2 https://8billiontrees.com/carbon-offsets-credits/how-many-trees-to-offset-1-ton-of-co2/
Page 197 of 228

Page 198

10 | P a g e
Our Key Mission Statements by 2045
Building & Energy
We will: 
• Switch to cleaner energy sources for heating in our
existing buildings
• Increase our use of renewables, battery storage and
consider carbon capture
• Through the Tackling Poverty Strategy and the Local
Housing Strategy we will provide advice and support to
local residents at risk of or in fuel poverty.
Transport
We will: 
• Continue to develop our alternative vehicle fleet through
targeted investment in light commercial vehicles, and
explore alternative fuels and emerging technologies for
heavy goods vehicles where feasible
• Continue to grow our internal and public electric vehicle charging network
• Promote the use of public transport and active travel.
Waste & Circular Economy
We will:
• Continue to improve our response to waste management and the circular economy.
Procurement
The Sustainable Procurement Duty (contained within the Procurement Reform (Scotland) Act 2014)
requires the council to consider the environment during its procurement activities. Procurement
therefore has an important role in the council’s Path to Net Zero (2045). The goods and services that
the council buys all have climate impacts and so our procurement function is well equipped via the
Scottish Government’s Sustainable Procurement Tools to identify opportunities where we can reduce
our emissions and encourage our supply chain to do the same.
Adaptation
Earlier in this document (within the North Lanarkshire (Overview) section) we mentioned the impacts
we are experiencing due to a changing climate. In 2025 the UK experienced the hottest summer yet. The
heavy rainfall and extreme winds of Storm Babet caused loss of life, travel disruption, disruption to
water supplies, damage to infrastructure and flooding. Extreme conditions can impact on the public
bodies such as emergency services and the council. The council and its partners plan for extreme
events within its Contingency Planning which helps the continued delivery of services to residents such
as during the ‘Beast from the East’ (snow and gale storm of 2018).
The Scottish National Adaptation Plan 2024-2029 is the pathway to becoming more resilient to the
impacts of climate change. The council’s primary focus is our response to flooding through our flood
Did you know? 
On a car journey from Glasgow to
London, petrol and diesel cars each
produce roughly 90 kg CO₂e —
but an electric car emits only about
29 kg CO₂e, making the same trip
with less than one-third of the
emissions (Source: Department for
Transport Statistics) 
Vehicle emissions can stay trapped
in our atmosphere for 300-1000
years. (Source: Greenhouse Gas Protocol)
Page 198 of 228

Page 199

11 | P a g e
prevention planning. The council contributes to both Clyde and Loch Lomond and Forth Estuary Local
Flood Risk Management Plans. A Strategic Flood Risk Assessment has been developed for North
Lanarkshire, ranking areas in terms of flood risk to property. This document allows the council to
prioritise actions to those areas at greatest risk of flooding.
Within the council's risk register, climate change has been identified as a key risk and has presently a
number of key controls and actions whose focus is mitigation and climate resilience. As a member of
Climate Ready Clyde the council contributed to the identification of risks and opportunities for the
Glasgow region. The council continues to participate in the Climate Ready Clyde partnership, which
will assist to further drive this agenda on a regional level via the delivery of Flagship Actions such as the
Clyde Climate Forest.
There are many examples of adaptation action within North Lanarkshire such as Cumbernauld Living
Landscape’s Ravenswood Local Nature Reserve project delivered in partnership with the council,
Scottish Wildlife Trust, The Conservation Volunteers, the James Hutton Institute and the housing
association Sanctuary Scotland which not only saw improvement in local greenspace but wider
benefits of improvements in mental health and the learning of new skills. We cannot afford to be too
relaxed or stop paying attention to the importance of climate resilience. We will continue to improve
our approach, and we will focus on the national objectives that we are able to contribute to.
Finance
The council’s 5-year Capital Programme (2024/25-2028/29) totals £880,941,830 and this includes
monies that will be spent on our buildings, greenspaces and fleet.
Table.8.Summary.of.North.Lanarkshire.Council"s.Capital.Programme.8680‗868❺
Service Area Total Allocations 2024/25-2028/29
Enterprise & Communities £838,161,004
Chief Executive’s £23,154,937
Other £19,625,889 
We recognise there is a funding gap between what we currently have and what is needed to deliver our
climate ambitions.  To help close this gap, we actively pursue external funding from national
programmes and other available sources. An example of external funding is below and a further
summary of other sources available to the council, its partners and communities is contained in
Appendix 5.
Scottish Public Sector Loan Scheme
Within this loan scheme, there is a fund known as ‘The Scotland Recycling Fund’. Despite its name, it is
nothing to do with recycling of waste. It is called a ‘recycling fund’ as the savings are continually
reinvested i.e. recycled to be used again. 
This fund is created using capital from the Scottish Government and matched by public bodies such as
councils. It supports long‑term investment in energy‑efficient projects—like upgrades to lighting,
heating, and insulation—with 100% interest‑free repayable support. Savings generated from these
projects are reinvested into further improvements, helping public bodies reduce carbon emissions year
after year. The council has a fund of £2m which since 2017 has enabled the delivery of 43 energy
efficiency projects with a total value of £3,605,418.16.
Page 199 of 228

Page 200

12 | P a g e
Planned reviews and updates
The Path to Net Zero (2045) is considered a ‘live’ document and therefore will be regularly reviewed to
ensure that it is taking into account all that is current. The responsibility of maintaining this document
will lie with the Climate & Energy Team supported by colleagues in other areas of the council.
An annual review will be carried out with the findings being reported to the Environment & Climate
Change Committee. The annual review will include progress against the annual targets and highlight
action taken. 
Page 200 of 228

Page 201

13 | P a g e
Appendix 1 Action Plan
This action plan is not an exhaustive list of how we intend to achieve net zero emissions by 2045 as we will continue to add and review our actions in order
to achieve our climate budgets. 
Colour Key for Responsible Section: 
Action & Description Key Mission &
Responsible
Section
Start
Year
End
Year
Carbon Savings
(tco2e)
Other
Benefits
Link to
Sustainable
Development
Goals (SDGs)
Impact Baseline
Net Zero Housing 
Develop a route map for
council stock to meet the
new SHNZs (following
publication of the new
standard)
Buildings &
Energy  2026 2028 314,700 tco2e
- Health
- Financial
- Fuel Poverty
7 (Affordable &
Clean Energy),
11
(Sustainable
Cities and
Communities),
13 (Climate
Action)
Area-wide 2,174,093,264 kwh
Heat in Buildings
Scotland: Area Based
Scheme (HiBS:ABS) 
Maximise the use of
(HiBS:ABS) through
encouraging homeowners
and private landlords to
participate 
Buildings &
Energy  2026 2028
The Scheme will improve
thermal efficiency in
participating homes reducing
consumption and associated
emissions
- Health
- Financial
- Fuel Poverty
7 (Affordable &
Clean Energy),
11
(Sustainable
Cities and
Communities),
13 (Climate
Action)
Area-wide 2,174,093,264 kwh
Salix Recycling Fund
Projects 
Energy Efficiency projects
chosen from a list of
eligible technologies that
have an acceptable
payback period in terms
of financial and carbon.
Buildings &
Energy 2026 2030 485 tco2e - Financial 13 (Climate
Action) Organisation 16,294 kwh
Housing Assets & Procurement Community Operations Place
Page 201 of 228

Page 202

14 | P a g e
Action & Description Key Mission &
Responsible
Section
Start
Year
End
Year
Carbon Savings
(tco2e)
Other
Benefits
Link to
Sustainable
Development
Goals (SDGs)
Impact Baseline
Community Hub
Projects 
Community hub projects
energy (heat and power)
consumption target to be
less than
100Kw/m2/annum. The
councils ACRs will set the
requirements for targeted
energy consumption
Buildings &
Energy 2022 2027
Carbon Savings will be
dependent on the
consumption of the original,
replaced building
-Health
-Financial
-Community Facility
7 (Affordable &
Clean Energy),
11
(Sustainable
Cities and
Communities),
13 (Climate
Action)
Organisation Consumption levels
varies per site
Non-Domestic Energy
Efficiency 
Energy efficiency
Improvements in the
Corporate Estate. Works
undertaken via NDEEF to
reduce carbon emissions
from buildings such as
schools, offices, sport
centres etc. Waste
products arising from
works will be recycled
where appropriate.
Proposed measures are
lighting upgrades, BEMS
optimisation, solar panels
and reinstating existing
CHP engines.
Buildings &
Energy 2023 2026 801 tco2e
-Health
-Financial
-Improved user
experience
7 (Affordable &
Clean Energy),
11
(Sustainable
Cities and
Communities),
13 (Climate
Action)
Organisation
Electricity –
64,292,292 kwh
Gas – 126,552,067
kwh
Energy Policy 
Review the council’s
Energy Policy to ensure
consumption reduction in
Buildings &
Energy 2026 2027 376 tco2e (Estimate) - Financial 13 (Climate
Action) Organisation
Electricity –
64,292,292 kwh
Gas – 126,552,067
kwh
Page 202 of 228

Page 203

15 | P a g e
Action & Description Key Mission &
Responsible
Section
Start
Year
End
Year
Carbon Savings
(tco2e)
Other
Benefits
Link to
Sustainable
Development
Goals (SDGs)
Impact Baseline
our offices and public
buildings is maximised
Sustainable
Procurement 
Ensure that the council
meets its responsibilities
in terms of sustainable
procurement promoting
‘reduce, recycle, reuse’
including the disposal of
items
Procurement 2014 2045
At present, we are unable to
report carbon savings data for
this action however will do so
when there is a nationally
agreed methodology to do so  
- Financial
- Reputation
12
(Responsible
Consumption
and
Production)
Organisation Not applicable
Enterprise Contract 
Ensure that the Enterprise
Contract fully meets the
requirement of Section 9
of the Procurement
Reform (Scotland) Act
2014 by limiting
unnecessary emissions,
supporting a circular
economy and where
possible negating
negative environmental
impacts.
Procurement 2024 2036 - - 13 (Climate
Action) Organisation Not applicable
Staff Training 
Create an online carbon/
climate literacy training
module:
establish a basic training
module for staff and
elected members
Buildings &
Energy, Waste,
Transport,
Procurement
2026 2027 2,500 tco2e - Financial
12
(Responsible
Consumption
and
Production), 13
(Climate
Action)
Organisation -
Page 203 of 228

Page 204

16 | P a g e
Action & Description Key Mission &
Responsible
Section
Start
Year
End
Year
Carbon Savings
(tco2e)
Other
Benefits
Link to
Sustainable
Development
Goals (SDGs)
Impact Baseline
Local Heat & Energy
Efficiency 
Continue to implement
and develop a LHEES for
NL
Lead the development of
the Local Heat and Energy
Efficiency Strategy’s
Delivery Plan
Buildings &
Energy 
Assets &
Procurement
2023 2043
Carbon savings will be
dependent on the number of
buildings connected to any
future heat network
-Financial
-Health
7 (Affordable &
Clean Energy),
13 (Climate
Action)
Area-wide
Baseline figure
dependent on
location.
Information on heat
network zones is
available within the
LHEES
Fabric Improvements of
the School Estate 
To upgrade all schools
above a ‘B’ (stock
condition)
Buildings &
Energy 
Assets &
Procurement
2025 2045
Carbon savings will be
dependent on the work
required to improve rating of
school
-Financial
-user experience
12
(Responsible
Consumption
and
Production), 13
(Climate
Action)
Organisation Consumption levels
varies per site
Decarbonisation retrofit
of the School Estate 
Decarbonisation suitable
to individual site needs
whilst ensuring
affordability of utilities. 
Buildings &
Energy 
Assets &
Procurement
2025 2045 2,850 -Financial
-user experience
7 (Affordable &
Clean Energy),
11
(Sustainable
Cities and
Communities),
12
(Responsible
Consumption
and
Production), 
13 (Climate
Action)
Organisation
Electricity –
64,292,292 kwh
Gas – 126,552,067
kwh
Decarbonisation of Fleet 
Utilisation of available
technology to reduce fleet
emissions.
Transport 2025 2028
Carbon savings will be
achieved however to what
level is dependent on the
alternative fuel
-Financial
-Health
12
(Responsible
Consumption
and
Production), 
Organisation
Petrol - 359,066
litres
Diesel - 1,845,793
litres
Page 204 of 228

Page 205

17 | P a g e
Action & Description Key Mission &
Responsible
Section
Start
Year
End
Year
Carbon Savings
(tco2e)
Other
Benefits
Link to
Sustainable
Development
Goals (SDGs)
Impact Baseline
13 (Climate
Action)
Kilsyth Flood Protection
Scheme 
Construction of Kilsyth
Flood Risk Reduction
Scheme and conclusion
of agreements with
Scottish Canals prior to
operation
Adaptation 2022 2027 Not applicable - Health
3 (Good health
and
Wellbeing),
13 (Climate
Action)
Area-wide Not applicable
Active Travel Delivery 
Developing and
implementing Active
Travel routes in line with
the council’s  Active
Travel Strategy approved
in August 2021 – Multiple
Projects
Transport 2021 2031 986 - Financial
- Health
3 (Good health
and
Wellbeing),
12
(Responsible
Consumption
and
Production), 
13 (Climate
Action)
Area-wide
Main mode of travel
2024:
Walking 12%
Driving car or van
58%
Passenger car or van
17%
Bicycle less than 1%
Bus 5%
Taxi 1%
Rail 4%
Other 2%
New Build – Energy
Efficiency Performance 
To increase the average
Energy Performance
Certificate rating for all
NLC new build homes
(3,229 properties), in
terms of energy efficiency
and environmental
ratings. 
Buildings &
Energy 2025 2030
New build offers carbon
avoidance rather than carbon
savings
- Financial
- Health
- Fuel Poverty
3 (Good health
and
Wellbeing),
12
(Responsible
Consumption
and
Production), 
13 (Climate
Action)
Area-wide
Baseline as at
2019/20 was Energy
Efficiency (B, 85) and
CO2 (B, 88)
Page 205 of 228

Page 206

18 | P a g e
Action & Description Key Mission &
Responsible
Section
Start
Year
End
Year
Carbon Savings
(tco2e)
Other
Benefits
Link to
Sustainable
Development
Goals (SDGs)
Impact Baseline
New Build - EV charging
availability 
To increase the number of
EV charging points
available for use within
council new build
developments. This
includes EV points to
individual homes and EV
pillars within parking
courts. Baseline at
2020/21 was 4 charging
points
Transport 2021 2030
Carbon savings will be
realised through the transition
from petrol and diesel
vehicles to Electric Vehicles
Improved User
Experience
11
(Sustainable
Cities and
Communities),  
13 (Climate
Action)
Area-wide -
Optimise climate
resources for SMEs 
Partnership working with
Zero Waste Scotland and
Energy Saving Trust.
Optimise resources
available for SMEs from
Zero Waste Scotland and
Energy Saving Trust in the
form of information,
expert help and practical
assessments of business.
Buildings &
Energy,
Procurement
2026 2030
Carbon savings will be
dependent on the measures
implemented by individual
businesses
- Finance
8 (Decent Work
and Economic
Growth), 
9 (Industry,
Innovation and
Infrastructure)
Area-wide -
Page 206 of 228

Page 207

19 | P a g e
Action & Description Key Mission &
Responsible
Section
Start
Year
End
Year
Carbon Savings
(tco2e)
Other
Benefits
Link to
Sustainable
Development
Goals (SDGs)
Impact Baseline
Delivery of Regional
Economic Strategy 
Glasgow City Region –
Delivery of Regional
Economic Strategy (RES)
and action plan on
climate change
Contribution to Delivery of
key Programmes in RES
such as Clyde Mission,
Housing retrofit, EV
infrastructure, Green
Business Support
Buildings &
Energy,
Procurement,
Transport
2021 2030
Carbon savings are
dependent on the programme
delivery within North
Lanarkshire
- Fuel Poverty
- Health
- Improved User
Experience
-Finance
3 (Good health
and
Wellbeing), 
7 (Affordable &
Clean Energy),
11
(Sustainable
Cities and
Communities),  
13 (Climate
Action) 
Area-wide -
Delivery of Glasgow City
Region's Sustainable
Procurement Strategy
Objective 5 - Mitigating
the impact to Climate
Change 
Maximise use of
procurement to support
transition to net zero
emissions, reduce supply
chain disruptions and
work with supply chains
to incentives climate
resilience, mitigation
efforts and build capacity
Procurement 2021 2030
Carbon savings are
dependent on minimising
waste and the reuse of
materials
- Finance
8 (Decent Work
and Economic
Growth), 
9 (Industry,
Innovation and
Infrastructure)
Area-wide -
Page 207 of 228

Page 208

20 | P a g e
Action & Description Key Mission &
Responsible
Section
Start
Year
End
Year
Carbon Savings
(tco2e)
Other
Benefits
Link to
Sustainable
Development
Goals (SDGs)
Impact Baseline
NL City Deal
Infrastructure
Programme 
Application of Scottish
Governments
Sustainability Test and
Carbon Management
Guidance into Business
cases, design,
procurement, and
implementation on whole
life basis. 
Fully integrate Active
Travel into proposals 
Support Sustainable
travel and 20 min
neighbourhoods
Procurement,
Transport 2021 2026
Carbon savings are
dependent on the specific
action taken
- Health
- Air Quality
3 (Good health
and
Wellbeing),
11
(Sustainable
Cities and
Communities),  
12
(Responsible
Consumption
and
Production) 
Area-wide -
Reduce embodied
carbon potential 
Enabling the repurposing
of historic buildings
Reducing embodied
carbon by repurposing
(and improving the energy
efficiency of) historic
buildings, beginning with
Kildonan Street,
Coatbridge, Motherwell
Old Town Hall and
Motherwell YMCA
Buildings &
Energy, Waste 2025 2030 Preservation of embodied
carbon of buildings retained - Sustainability
11
(Sustainable
Cities and
Communities),  
12
(Responsible
Consumption
and
Production) 
Area-wide -
Page 208 of 228

Page 209

21 | P a g e
Action & Description Key Mission &
Responsible
Section
Start
Year
End
Year
Carbon Savings
(tco2e)
Other
Benefits
Link to
Sustainable
Development
Goals (SDGs)
Impact Baseline
Development of Local
Development Plan 
Local Development Plan 2
Produce Local
Development Plan 2 in
line with the requirements
of the Development Plan
Regulations and in
compliance with NP4.
NPF4 and the National
Planning Policy Handbook
(therein) will be part of the
Development Plan and
therefore Planning Policy.
Buildings &
Energy 2022 2027 Not applicable
- protection of
greenspace
-sustainable
development
11
(Sustainable
Cities and
Communities),  
15 (Life on
Land)
Area-wide Not applicable
Page 209 of 228

Page 210

22 | P a g e
Appendix 2 The Council’s Carbon Boundary
Carbon Boundaries are imaginary containers that capture all the emissions that organisations
have a responsibility for. The council’s Carbon Boundary was determined by looking at how our
buildings are used, transport use for service delivery and waste management for North
Lanarkshire. In line with guidance, we are currently looking at how we can capture our
procurement emissions as well as our staff’s use of public transport for business purposes.
Figure.❶.North.Lanarkshire.Council҂s.Carbon.Boundary 
Page 210 of 228

Page 211

23 | P a g e
Appendix 3 Supporting Strategies and Plans
Document Link
Air Quality Action Plan https://www.northlanarkshire.gov.uk/pests-and-pollution/pollution/air-
quality/air-quality-management-areas
Active Travel Access
Strategy
https://www.northlanarkshire.gov.uk/your-council/council-strategies-and-
plans/council-strategies/active-travel-strategy
Biodiversity Action Plan
https://www.northlanarkshire.gov.uk/leisure-parks-and-culture/countryside-
and-parks/countryside-management-and-biodiversity/biodiversity/our-local-
biodiversity
Contaminated Land
Strategy
https://www.northlanarkshire.gov.uk/pests-and-
pollution/pollution/contaminated-land
Core Paths Plan https://www.northlanarkshire.gov.uk/leisure-parks-and-culture/countryside-
and-parks/accessing-local-environment
Corporate Asset
Management Plan
https://www.northlanarkshire.gov.uk/your-council/council-strategies-and-
plans/council-strategies/corporate-asset-management-plan
Food Growing Strategy https://www.northlanarkshire.gov.uk/leisure-parks-and-culture/countryside-
and-parks/community-food-growing-and-allotments
Housing Asset
Management Plan
https://www.northlanarkshire.gov.uk/sites/default/files/2023-
04/Homes%20fit%20for%20the%20future%2C%20HAMP%202021-26.pdf
Local Development Plan https://www.northlanarkshire.gov.uk/planning-and-building/development-
plans/current-north-lanarkshire-local-development-plan
Local Heat & Energy
Efficiency Strategy and
Delivery Plan
https://www.northlanarkshire.gov.uk/your-council/council-strategies-and-
plans/council-strategies/local-heat-and-energy-efficiency-strategy-and-
delivery-plan
Local Housing Strategy https://www.northlanarkshire.gov.uk/your-council/local-housing-strategy
Local Transport Strategy
New strategy expected 2026.
https://www.northlanarkshire.gov.uk/your-council/council-strategies-and-
plans/council-strategies/local-transport-strategy
Open Space Strategy https://www.northlanarkshire.gov.uk/planning-and-building/development-
plans/land-supply/open-space-strategy
Tackling Poverty
Strategy ‘Towards a
Fairer North
Lanarkshire’
https://www.northlanarkshire.gov.uk/your-community/tackling-poverty 
Tree Risk Management
Strategy
https://www.northlanarkshire.gov.uk/sites/default/files/2023-
01/TRAM%20Strategy.pdf 
Page 211 of 228

Page 212

24 | P a g e
Appendix 4 North Lanarkshire Council
North Lanarkshire council, established in 1996, is a single-tier authority and a member of the
Glasgow City Region. It employs 13,400 staff (2024) and is responsible for education, social
care, infrastructure, economic development, housing, environmental protection, waste
management, and community planning, ensuring best value in service delivery.
The council manages approximately 1,000 operational assets worth £1.2bn, including schools,
care homes, depots, offices, and surplus land. Its roads infrastructure spans 1,575 km of
carriageway, 199 pedestrian crossings, 2,902 km of footpaths, 542 bridges, and over 61,241
street lighting columns. Additionally, it oversees a range of leisure and cultural facilities,
including sports venues, community centres, museums, libraries, and theatres.
Our Services 
The following is a summary of relevant activities carried out by our Services.
Education and Families Service continues to encourage school action on embedding
sustainability via the curriculum for excellence. Topics such as litter, energy, water, waste
management, healthy living and transport are tackled. Each year the schools participate in the
Earth Hour Competition which encourages pupils to use their artistic or poetic creativity to
produce works. A selection of these is chosen and are used to create short videos for social
media, aired on the day of Earth Hour.
Enterprise and Communities, as one of the larger services within the organisation, has
responsibility for: - regulatory and waste solutions; environmental assets; (corporate estate)
assets and procurement delivering energy efficiency works via the NDEE and BEMS
management; communities; housing (operations, repairs and projects); new build housing; and
planning. The diverse range of functions offered by the service can significantly impact on the
council’s carbon footprint. E.g. Electrification of the fleet; diversion of waste from landfill (the
Clyde Valley Residual Waste Project) and recycling rates; development of environmental
resources as possible climate resources; improving the energy efficiency of the built
environment (domestic and non-domestic) such as EESSH and other Energy Efficient Scotland
programmes. The council does not have a direct labour organisation rather it procures the
services required to carry out repairs and major works to assets such as buildings, social
housing and roads. The council does not currently report the consumption and emissions of its
contractors which are associated with works carried on its behalf.
Page 212 of 228

Page 213

25 | P a g e
The Health and Social Care service report directly to the Joint Improvement Board. The JIB
report annually as a separate entity for the purposes of complying with Public Bodies Climate
Change Duties Annual Compliance Reporting. 
The council is committed to ensuring North Lanarkshire is climate resilient and maximises its
opportunities to adapt via its membership in Climate Ready Clyde. The value of other external
relationships in maximising opportunities for knowledge and project development is realised
through the council’s continued involvement in other regional bodies such as the Glasgow and
the Clyde Valley Strategic Development Planning Authority and other organisations such as the
Sustainable Scotland Network and the Public Sector Climate Adaptation Network.
Roles and responsibilities
The council’s committee structure was amended in 2022 and included the change of the
Environment and Transportation committee to the Environment and Climate Change
Committee. This signified the overt commitment to climate action and is evidence of the
corporate awareness of the importance of this issue. Within the elected members’ roles is that
of the Climate Champion whose role is independent and allows to them to advocate for change
and also to question and challenge where necessary.
The governance of climate change and the council’s duties as a public body lies with the
Sustainable Futures (SF) Board and is led by the Chief Officer (Assets & Procurement) as the
Senior Responsible Officer and is supported by the Chief Officer (Community Operations). The
Board’s remit is to deliver key projects in its Programme of Work that will assist the council and
the area of North Lanarkshire to become more resilient whilst reducing its emissions. The SF
Board reports to relevant Committees e.g. progress on housing actions is reported to Housing
Committee.
The Public Sector Duties Reporting Working Group assists with the completion of the annual
reporting duty with the SF Board having oversight this. The annual report provides a progress
update on the individual public body’s journey towards net zero and how it contributes to the
national adaptation strategy. It is reported in Cycle 1 to the Environment & Climate Change
Committee having been submitted to the Scottish Government the previous November.
The Local Heat and Energy Efficiency Strategy Board oversees progress of the LHEES and its
Delivery Plan. The Board has responsibility for approving the strategy’s direction and any
significant changes to it and the Delivery Plan. There is a crossover in terms of this Board and
that of the SF Board as some of the actions contained within the Delivery Plan will contribute to
the SF Programme of Work. 
The Audit and Scrutiny Team are independent of the above activity and police the organisation’s
progress in terms of the Public Sector Duties. Updates on improvement actions are provided,
and progress reports from the Chief Officer (Assets & Procurement) are submitted to the Panel
on request. The Risk Team are also independent and ensure that regular consideration is given
to effective climate action controls to guarantee that all climate risks are owned and managed
throughout the organisation.
North Lanarkshire Partnership is the Community Planning Partnership which facilitates a
collaboration within the Strategic Leadership Board of Chief Officers and Chairs of key partner
agencies. A strategic aim of this collective is climate change and supports the community Local
Outcome Improvement Plans where Environment was identified as priority by local
communities. 
Page 213 of 228

Page 214

26 | P a g e
Figure.❷.Climate.™.Energy.Team.Staffing.Structure 
The Climate & Energy Team is based within the Asset Management Section of Assets &
Procurement. The team has the overall responsibility for this document (Path to Net Zero
(2045)), the LHEES and its Delivery Plan as well as the council’s Energy Policy including any
updates or reviews. They are lead for the Corporate Climate Change risk, carrying out frequent
reviews of controls and actions as well as co-ordinating the council’s response to all external
consultations related to the Climate Change (Scotland) Act 2009. The Team is also part of the
Estate Working Group whose members are all based within Assets & Procurement. The Working
Group’s remit is to improve the condition of non-domestic buildings with a view to
decarbonising as part of any relevant works taken.
Page 214 of 228

Page 215

27 | P a g e
Appendix 5 External Funding Opportunities 
Finance Source Finance Type Applicants Category Description
Electric Vehicle
Infrastructure Fund
Grant Local authorities  Mitigation £30M in funding for Scotland's local authorities to install public EV
charging infrastructure. £4.73M has been allocated to the Glasgow
City Region which includes North Lanarkshire.
Public Sector Heat
Decarbonisation
Fund
Grant Local authorities,
universities and
arms-length
organisations
Mitigation Funding for public sector building heating decarbonisation and
energy efficiency retrofit improvements. £11M in funding for the
decarbonisation of public sector properties.
Climate Ready
Regions Funding
Grant Regional
adaptation
partnerships
Adaptation Funding for Scottish regional adaptation partnerships to advance
locally led solutions identified by partnership members.
Page 215 of 228

Page 216

28 | P a g e
Finance Source Finance Type Applicants Category Description
SUEZ Communities
Fund - Scotland -
Grantscape
Grant Not-for-profits;
community
groups and local
authorities
Nature-based £200,000 in funding for applications of up to £40,000 of
environmental improvement capital works at public amenities.
Applications made for the public amenity, biodiversity or historic
building funding category must be in the vicinity of a landfill site or
transfer station.
Clean Heating &
Energy Efficiency
Grants (Home Energy
Scotland Grant &
Loan) 
Grant Homeowners Mitigation Grant funding for homeowners of up to £7,500 for energy efficiency
improvements and £7,500 for clean heating systems. Houses in rural
areas can receive up to an additional £1,500 for both category.
Additional interest-free loans are also available.
CARES Community
Buildings Fund
Grant Charities,
community
groups or faith
groups
Community Funding for renewable technology installation in owned or leased
buildings like heat pumps, PV panels and energy saving
improvements.
Rural and Island
Infrastructure Fund
Grant Land-owning
business or
charge point
operator
Mitigation Funding to install public EV charging infrastructure, maximums are
based on charger type. Applications must be made for land within a
category 5-8 postcode under the Scottish 8-Fold Urban Rural
Classification.
Page 216 of 228

Page 217

29 | P a g e
Finance Source Finance Type Applicants Category Description
Climate Engagement
Fund
Grant Local community
or voluntary
groups
Community Trusts
Community
Planning
Partnerships
Colleges and
Universities
Cultural
Organisations
Science and
Environmental
Organisations
Community £275,000 in funding for projects that help to build people's
understanding of the climate emergency. £25K-80K per project
funding allocations.
Lanarkshire Climate
Action Hub Micro-
grants
Grant Community
groups
Community Various grants to spur community-led climate action within
Lanarkshire. Awards range from £250 to £2,000 including the
Climate Ready Places, Climate Change in Your Community, Active
Travel Communities, Youth Reuse and Sharing, and the Climate
Action grants.
Page 217 of 228

Page 218

30 | P a g e
Finance Source Finance Type Applicants Category Description
Urban Forestry
Challenge Fund
Grant Non-profits or
constituted
bodies
Nature-based Funding for new tree planting, tree and woodland maintenance,
urban forestry management research, education, skills development
and engagement. Areas are selected based on the provided Tree
Equity Score, prioritising areas of at least moderate priority. Projects
can apply for between £2,000 up to £20,000 and over £20,000 up to
£100,000. 
Scottish Central
Government Energy
Efficiency Grant
Scheme
Grant Public Sector
(limited)
Mitigation Capital grant funding for heat decarbonisation and energy efficiency
projects across the public sector, specifically to organisations with
limited access to borrowing funds for this category of work.
Scottish Public
Sector Energy
Efficiency Loan
Scheme and Scotland
Recycling Fund
Loan Public sector
bodies  
Mitigation Financing for energy efficiency projects with a maximum 12-year
payback at a cost of £305 per tonne of carbon dioxide equivalent. 
Heat Network Fund Grant Public, private and
third sector
businesses and
organisations
Mitigation Funding for projects that support commercialisation or construction
support for the legal definition of a district heat network or
communal heat network. Maximum grant amount £1M. 
Page 218 of 228

Page 219

31 | P a g e
Finance Source Finance Type Applicants Category Description
National Lottery
Climate Action Fund
Grant Registered
charities, public
body, school,
college or
university
All Various opportunities through the Climate Action Fund Food
Systems, Energy and Climate, Nature and Climate and Our Shared
Future strands. Funding ranges greatly across categories from
£50,000 to £7M 
Page 219 of 228

Page 220

Page 220 of 228

Page 221

North Lanarkshire Council
Report
Environment and Climate Change Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    JMcK/CPT Date 29/04/26 
Contracts awarded below Committee approval threshold 
From  James McKinstry - Chief Officer (Assets and Procurement)  
E-mail McKinstryJ@northlan.gov.uk   
Executive Summary
In accordance with the Council’s General Contract Standing Orders (“GCSOs”), GCSO
21.10 requires a summary report be presented to members with details of contracts
awarded since last committee, specifically for the spend range: 
• over £50,000 but below £500,000 for supplies or services; and,
• over £500,000 but below £2,000,000 for works. 
Recommendations
It is recommended that the Environment and Climate Change Committee: 
(1) Acknowledge the contract awards made since last committee reporting cycle.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Page 221 of 228

Page 222

1. Background 
1.1 The Local Government (Scotland) Act 1973 section 81 requires local authorities to
“…make standing orders with respect to the making by them or on their behalf of
contracts for the supply of goods or materials or for the execution of works.”. 
1.2 The Council’s General Contract Standing Orders (“GCSOs”) set out the council’s
specific procurement procedures and responsibilities at all spend levels, and include
the reporting requirements of procurement activity, including contracts awards, to
committee for either approval or acknowledgement. 
2. Report 
2.1 In accordance with GCSO 21.10, this report summarises the contract awards since last
committee, specifically for the spend range: 
• over £50,000 but below £500,000 for supplies or services; and,
• over £500,000 but below £2,000,000 for works. 
2.2 If you require further information regards the contract awards reported, please refer to
the lead service area / Chief Officer detailed in the appendix. 
3. Measures of success 
3.1 All requirements contracted contribute to either the council’s programme of work and/or
fulfil a statutory requirement. 
3.2 All contract awards secure best value for the council in accordance with their evaluation
criteria. 
3.3 All necessary diligence has been undertaken in the evaluation and appointment of
contractors. 
3.4 All contract awards are logged in the council’s contract register. 
4. Supporting documentation 
4.1 Appendix 1 – Summary of contracts awarded. 
James McKinstry
Chief Officer (Assets and Procurement) 
5. Impacts 
5.1 Impacts considered as part of the contract award procedures are recorded in the
individual contract award reports held by the lead service area.  
Page 222 of 228

Page 223

Appendix 1 – Summary of Contracts Awarded 
Contract Ref NLC-CPT-25-123
Title Supply and Delivery of 40 x 35 Cubic Yard Open Skips
Classification Supplies
Chief Officer, Procuring Service Area Lyall Rennie, Chief Officer (Community Operations)
Competition Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on 3rd party frameworks
Procurement Route Call-off following Mini Competition using a Third-Party Framework (Multi Contractor Framework)
No. of Contractors invited 5
No. of Bids Received 2
Award Criteria Most Economically Advantageous Tender (“MEAT) Scoring Model
Evaluation Scores – Successful 91.50%
Evaluation Scores – Unsuccessful Not Applicable
Comments Procured via Scotland Excel Framework Agreement for Waste Disposal Equipment, Lot 1 – Skips and
Containers (Ref.0923).
Only one compliant tender received; the other tenderer failed to comply with the council’s Details of
Requirements.
Award
Details
Value £268,000
Contract Duration 2 months
Contractor Name Skip Units Limited
Contractor Size SME
Contractor Location Derbyshire
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? No
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer
Scotland Duty ☐
HR Policy Impact ☐ Data Protection
Impact ☐
Environment / Carbon
Impact ☒
Risk Impact ☒ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☒ Technology / Digital
Impact ☐
Communications
Impact ☐
Armed Forces
Covenant Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer
Page 223 of 228

Page 224

Contract Ref NLC-SLP-25-023         
Title Supply of 6 x Precinct Sweepers
Classification Supplies
Chief Officer, Procuring Service Area Lyall Rennie, Chief Officer (Community Operations)
Competition Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on 3rd party frameworks
Procurement Route Call-off following Direct Award using a Third-Party Framework (Multi Contractor Framework)
No. of Framework Contractors 6
Award Criteria Best Value assessment, in accordance with the Framework Information
Comments Procured via Scotland Excel Framework Agreement for Heavy Vehicles - Lot 7 Complete Road Sweepers
(Ref.0321)
Award
Details
Value £425,000
Contract Duration 2 months
Contractor Name Bucher Municipal Limited
Contractor Size SME
Contractor Location Surrey
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? No
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer
Scotland Duty ☐
HR Policy Impact ☐ Data Protection
Impact ☐
Environment / Carbon
Impact ☒
Risk Impact ☐ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☐
Communications
Impact ☐
Armed Forces
Covenant Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer 
Page 224 of 228

Page 225

Contract Ref NLC-CPT-25-100
Title Machine Repairs of Building Cleaning Equipment
Classification Services
Chief Officer, Procuring Service Area Lyall Rennie, Chief Officer (Community Operations)
Competition Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on 3rd party frameworks 
Procurement Route Call-off following Direct Award using a Third-Party Framework (Single Contractor Framework)
No. of Framework Contractors 1
Award Criteria Best Value assessment, in accordance with the Framework Information
Comments Procured via Scotland Excel Framework Agreement for Cleaning Equipment - Lot 2 Maintenance &
Repair of Cleaning Equipment & Associated Products (Ref.0523)
Award
Details
Value £210,824
Contract Duration 42 months (initial 30 months, option to extend 12 months)
Contractor Name DMG Floorcare Ltd
Contractor Size SME
Contractor Location Glasgow
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? Yes
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer
Scotland Duty ☐
HR Policy Impact ☐ Data Protection
Impact ☐
Environment / Carbon
Impact ☒
Risk Impact ☒ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☒ Technology / Digital
Impact ☐
Communications
Impact ☐
Armed Forces
Covenant Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer 
Page 225 of 228

Page 226

Contract Ref NLC-SLP-25-020 
Title Supply of 2 x 15T Road Sweepers
Classification Supplies
Chief Officer, Procuring Service Area Lyall Rennie, Chief Officer (Community Operations)
Competition Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on 3rd party frameworks
Procurement Route Call-off following Direct Award using a Third-Party Framework (Multi Contractor Framework)
No. of Framework Contractors 10
Award Criteria Best Value assessment, in accordance with the Framework Information
Comments Procured via Scotland Excel Framework Agreement for Heavy Vehicles - Lot 1 Chassis (Ref.0321)
Award
Details
Value £333,328
Contract Duration 5 months
Contractor Name Volvo Truck and Bus Centre North & Scotland
Contractor Size Large Company
Contractor Location Warwickshire
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? Yes
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer
Scotland Duty ☐
HR Policy Impact ☐ Data Protection
Impact ☐
Environment / Carbon
Impact ☒
Risk Impact ☐ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☐
Communications
Impact ☐
Armed Forces
Covenant Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer 
Page 226 of 228

Page 227

Contract Ref NLC-SLP-25-027
Title Provision of Routing with Associated In-Cab and Handheld Solution
Classification Supplies
Chief Officer, Procuring Service Area Lyall Rennie, Chief Officer (Community Operations)
Competition Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on 3rd party frameworks
Procurement Route Call-off following Direct Award using a Third-Party Framework (Multi Contractor Framework)
Award Criteria Best Value assessment, in accordance with the Framework Information
Comments Procured via Direct Award approach, considering the relevant information through the Crown
Commercial Services G-Cloud 14 Framework (RM1557.14), Lot 2: Cloud Software.    
“G-Cloud” is an Agreement established by Crown Commercial Services (“CCS”) to provide a large variety
of cloud-based services from a range of suppliers under: cloud hosting; cloud software; and cloud
support. The G-cloud provides the online sourcing platform for public bodies to use search parameters
to narrow suppliers and/or solutions to match their core specification of requirements, then refine
further through benchmarking and comparison of the potential offers/solutions. 
Award
Details
Value £482,827
Contract Duration 48 months (initial 36 months, option to extend 12 months)
Contractor Name Bartec Municipal Technologies Limited
Contractor Size SME
Contractor Location South Yorkshire
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? Yes
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer
Scotland Duty ☐
HR Policy Impact ☐ Data Protection
Impact ☐
Environment / Carbon
Impact ☒
Risk Impact ☐ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☒
Communications
Impact ☐
Armed Forces
Covenant Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer 
Page 227 of 228

Page 228

Contract Ref NLC-SLP-25-035 
Title Resilience Software
Classification Supplies
Chief Officer, Procuring Service Area Lyall Rennie, Chief Officer (Community Operations)
Competition Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on 3rd party frameworks 
Procurement Route Call-off following Direct Award using a Third-Party Framework (Multi Contractor Framework)
Award Criteria Best Value assessment, in accordance with the Framework Information
Comments Procured via Direct Award approach, considering the relevant information through the Crown
Commercial Services G-Cloud 14 Framework (RM1557.14), Lot 2: Cloud Software.    
“G-Cloud” is an Agreement established by Crown Commercial Services (“CCS”) to provide a large variety
of cloud-based services from a range of suppliers under: cloud hosting; cloud software; and cloud
support. The G-cloud provides the online sourcing platform for public bodies to use search parameters
to narrow suppliers and/or solutions to match their core specification of requirements, then refine
further through benchmarking and comparison of the potential offers/solutions.
Award
Details
Value £99,000
Contract Duration 36 months (initial 24 months, option to extend 12 months)
Contractor Name Continuity 2 Ltd
Contractor Size SME
Contractor Location Glasgow
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? Yes
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer
Scotland Duty ☐
HR Policy Impact ☐ Data Protection
Impact ☒
Environment / Carbon
Impact ☐
Risk Impact ☒ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☒ Technology / Digital
Impact ☒
Communications
Impact ☒
Armed Forces
Covenant Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer 
Page 228 of 228