Agenda Document Pack - Enterprise and Fair Work Committee - 14/02/2025

North Lanarkshire Council · 14 February 2025
Back to Enterprise and Fair Work Committee — 14 February 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

5 February 2025 
Members of the 
Enterprise and Fair Work Committee
Chief Executive’s Office
Archie Aitken
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk 
Notice is given that a Meeting of the Enterprise and Fair Work Committee is to be held in
the Council Chamber, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on Friday, 14
February 2025 at 10:00 AM which you are requested to attend. 
The agenda of business is attached. 
Archie Aitken
Chief Officer (Legal & Democratic) 
Members : 
Clerk Name: Clare Louise McDonald
Clerk Telephone: 07350 435308
Clerk Email: committee@northlan.gov.uk 
A McVey, F McKay, M Boyd, A Bustard, D Crichton, G Currie, P Di Mascio, K Docherty, A
Duffy-Lawson, H Dunbar, W Goldie, H Gray, L Jarvie, J Leckie, F MacGregor, A Masterton,
A McCrory, B McCulloch, M McPake, L Mitchell, L Nolan, G Robinson, R Sullivan, A
Thomas, C Williams.  
Page 1 of 100

Page 2

Page 2 of 100

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical
Standards In Public Life Etc. (Scotland) Act 2000   
Operational   
2 Economic Regeneration Delivery Plan Action Plan
2025-26
Submit report by the Chief Officer (Place) seeking
approval of North Lanarkshire's Economic
Regeneration Delivery Plan (ERDP) Action Plan
2025/26 
5 - 32 
3 Smart Parks Update
Submit report by the Chief Officer (Business and Digital
Solutions) providing an update on the deployment of
Internet of Things technologies via Smart Park Proof of
Concepts within two of the Council's country parks 
33 - 40 
4 Review of Business Support Services
Submit report by the Chief Officer (Place) seeking
approval of amendments and improvements to the
current suite of business grant funding 
41 - 58 
5 External Funding Update Report
Submit report by the Chief Officer (Place) providing an
update on progress in developing and securing
external funding for physical regeneration projects
across North Lanarkshire and seeking approval of the
reallocation of the Vacant and Derelict Land Fund
2025/26 
59 - 66 
6 UK Shared Prosperity Fund 2025 - 26
Submit report by the Chief Officer (Place) seeking
approval for delivery of the UK Shared Prosperity Fund
for 2025/26                 
67 - 76
Page 3 of 100

Page 4

Contracts   
7 Contract Award for Business Support and Expert
Help Services 2025-2029
Submit report by the Chief Officer (Place) seeking
approval to award a Multi Lot/Multi Supplier Framework
Agreement for Business Support and Expert Help
Services 2025-2029 
77 - 94 
8 Contract Awards Below Committee Approval
Threshold
Submit report by the Chief Officer (Assets and
Procurement) acknowledging the contract awards
made since last committee reporting cycle 
95 - 100 
Page 4 of 100

Page 5

North Lanarkshire Council
Report
Enterprise & Fair Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    PH/SH/MH Date 14/02/25 
Economic Regeneration Delivery Plan Action Plan 2025/26 
From  Pamela Humphries, Chief Officer (Place) 
E-mail hyndsm@northlan.gov.uk Telephone Mark Hynds, Economic
Analyst, 07583 023 248 
Executive Summary 
The purpose of this report is to seek approval for North Lanarkshire’s Economic
Regeneration Delivery Plan (ERDP) Action Plan 2025/26. 
The ERDP is a high-level economic development framework which is aligned to the
composite capital programme and delivers on the first priority of The Plan for North
Lanarkshire – improving economic outcomes and opportunities for all. 
It cuts across various themes of the Programme of Work but mainly focuses on the
Transforming Places workstream. 
An updated ERDP was approved by the Enterprise & Fair Work Committee in February
2023 and covers the period 2023-2028. 
Since 2019, an ERDP Action Plan has been developed annually, detailing the key
milestones and targets North Lanarkshire Council and our partners will take over the
coming financial year to achieve the priorities set out across the ERDP’s 4 key interrelated
themes. 
If approved, the 2025/26 action plan will undergo monitoring and review with an end year
performance report due to be presented to committee Cycle 3 2026, alongside the ERDP
Performance Framework which is used to monitor wider ERDP performance over the short,
medium and longer-term (through to 2035). 
A copy of the draft ERDP Action Plan 2025/26 is appended to this report. 
Recommendations
It is recommended that the Enterprise and Fair Work Committee: 
(1) Approves the ERDP Action Plan 2025/26, which is attached to this report as an
appendix
(2) Acknowledges that an annual performance report detailing progress against the
2025/26 Action Plan and wider ERDP Performance Framework will be presented to
committee in 2026. 
Item 2
Page 5 of 100

Page 6

1. Background 
1.1 The 2023-2028 ERDP, approved by Enterprise & Fair Work Committee in February
2023, aims to help co-ordinate physical and economic regeneration activity across
North Lanarkshire, increase economic output and help address social and economic
inequality. It continues to build upon the first ERDP which covered the period 2019-
2023 and focuses on the same four key interrelated themes. 
1.2 Since 2019, an Action Plan to support the delivery of the ERDP through a range of key
measures and investment programmes has also been produced and approved each
year by committee. The Action Plan sets the priorities for the financial year ahead,
reflecting progress made to date and the evolving priorities of the council. The current
2024/25 ERDP Action Plan was approved in February 2024. 
1.3 An accompanying ERDP Performance Framework was approved by Enterprise and
Growth Committee in February 2021. This comprises of a group of performance
indicators at three levels. These indicators aim to collectively provide an overview of
how the North Lanarkshire economy is performing as well as helping us to understand
the impact that the delivery of the ERDP is having on improving economic opportunities
and outcomes for all. 
1.4 Since the inception of the ERDP, several significant milestones have been achieved
through the delivery of the New Supply, Growth and City Deal programmes. These
achievements have been reported to committee in previous annual progress and
performance updates. The next performance report will be presented to committee in
Cycle 3 2025, detailing progress against the 2024/25 ERDP Action Plan and wider
ERDP Performance Framework.  
2. Report 
Economic Regeneration Delivery Plan 2023 - 2028 
2.1 The ERDP focuses on four key inter-related themes: 
• developing housing that promotes improved quality of life and creates a better place
to live;  
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (1) Ensure a housing mix that supports social inclusion and
economic growth 
(2) Refocus our town centres and communities to be multi-
functional connected places which maximise social, economic,
and environmental opportunities 
(3) Maximise the use of our marketable land and assets through
improved development in business and industrial infrastructure 
(4) Market and promote North Lanarkshire as the place to live,
learn, work, invest, and visit 
(5) Grow and improve the sustainability and diversity of North
Lanarkshire's economy
Programme of Work Transforming Places
Page 6 of 100

Page 7

• reshaping our town centres to ensure that these provide modern and attractive
centres that meet the needs of our communities;
• improving our business and industrial infrastructure, creating opportunities for
investment and for companies to start-up or relocate here; and
• continuing to improve our connectivity and develop new opportunities by
transforming our road, rail and digital infrastructure. 
2025/26 Action Plan 
2.2 To support the delivery of the ERDP objectives, annual ERDP Action Plans have been
developed each financial year since 2019/20. 
2.3 Appendix 1 provides detail on the key ERDP actions, targets and objectives for
2025/26. This is aligned to the four themes of the ERDP and details which ERDP priority
each action is specifically seeking to achieve. 
2.4 The delivery of the Action Plan will be overseen by the ERDP Steering Group with
progress updates provided to committee on an annual basis. Detailed reports
concerning individual projects and programmes within the ERDP (e.g. City Deal
Programme) are also provided to committee on a regular basis. 
3. Measures of success 
3.1  The annual ERDP Action Plan contains multiple targets with achievement of the targets
being key to the success of the refreshed ERDP. 
3.2 A robust Economic Performance Framework has been established and contains a
series of key performance indicators, with short, medium, and long-term targets
attached as the operational measures of success. 
4. Supporting documentation 
4.1  Appendix 1  Economic Regeneration Delivery Plan Action Plan 2025/26   
Pamela Humphries
Chief Officer (Place) 
Page 7 of 100

Page 8

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The primary aim of the 2023-2028 ERDP is to support inclusive economic growth
and opportunities for all. In doing so it aims to support investment in creating a
more equitable and fairer place for residents of North Lanarkshire to live 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The 2023 - 2028 ERDP is funded through a mixture of external funding sources,
and from the council’s capital programmes. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Page 8 of 100

Page 9

Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The 2023-2028 ERDP remains one of the council’s key strategies and will be
promoted accordingly through corporate communications, mainly via our digital
platforms. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Risks are recorded and managed within Corporate Risk Register. 
Key risk is failure to deliver on the ERDP and its objectives of helping co-ordinate
physical and economic regeneration activity across North Lanarkshire, increasing
economic output and helping address social and economic inequality. This would
result in economic and social benefits to residents and business across North
Lanarkshire and significant reputational damage to the Council given the widespread
public nature of the programme. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 9 of 100

Page 10

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 10 of 100

Page 11

Economic Regeneration Delivery Plan
Action Plan 2025/26 
Page 11 of 100

Page 12

Theme: Live
ERDP Priority 1: Developing housing that promotes improved quality of life and creates a better place to live
Reference No. ERDP Priority What we’ve delivered so
far…
What we’ll aim to deliver
during 2025/26…
Lead Team
1.1 Continue to focus investment
towards the council’s affordable
housing stock to make sure that
the target of 5,000 new council
homes for North Lanarkshire is
reached by 2035
Between 2010/11 and
2023/24 NLC has delivered
1,351 new build homes
across the authority via the
New Supply Programme
alone, with a further 268
scheduled to complete
during 2024/25 
Completion of 53 new build
homes during 2025/26 
New Supply 
1.2 Begin construction on six
new build developments,
totalling 140 homes, during
2025/26
New Supply
1.3 As of 31 March 2024, NLC
has brought 753 homes into
council ownership since the
introduction of the Open
Market / Empty Homes
Purchase Schemes, with a
further 100 estimated to
complete during 2024/25
120 Open Market / Empty
Homes Purchase Scheme
completions during 2025/26
New Supply
1.4 As of 31 March 2024, NLC
has acquired 205 new build
homes from the private
sector, with a further 82
planned to be completed
during 2024/25
Complete the acquisition of
20 new build off the shelf
units during 2025/26
New Supply
1.5 Continue to support the delivery
of the affordable housing
programme including intermediate
tenures such as mid-market rent
Between 2010/11 and
2023/24, 2,104 affordable
homes have been delivered
via the council’s New Supply
Programme
and 2,444 by Registered
Social Landlords (RSL’s)
Prepare the 2026/27
Strategic Housing
Investment Plan (SHIP)
which will identify sites
to meet Local Housing
Strategy priorities and
New Supply
Page 12 of 100

Page 13

maximises the use of
available Scottish
Government grant funding. 
Support the delivery of sites
within the current
2025/26 SHIP and spend full
Resource Planning
Assumption (RPA)
allocation. 
Develop proposals for mid-
market rent project(s) linked
to town centre
regeneration, subject to
available funding.
1.6 Enable private sector housing
development to support the local
economy and the regeneration of
strategic sites such as Ravenscraig.
2,659 private tenure houses
were completed and
occupied across North
Lanarkshire between
2019/20 and 2023/24. 
A further 720 private tenure
units are estimated to be
completed during 2024/25.
709 private tenure units
estimated to be completed
during 2025/26. 
Complete Review of 2025
Housing Land Audit 
Progress new Local
Development Plan. 
Launch Invest in NL service
to help facilitate &
accelerate investment in
new housing 
Planning 
Page 13 of 100

Page 14

Theme: Invest
ERDP Priority 2: Reshaping our town centres to ensure they provide modern and attractive centres that meet the needs of our communities
Reference No. ERDP Priority What we’ve delivered so
far…
What we’ll aim to deliver
during 2025/26…
Lead Team
2.1 Establish and commence delivery
of town action plans for all eight
town centres (aligned with our
approved town visions), agreeing
short, medium and long-term
investment plans for each.
Eight Town Visions were
approved by committee in
2021. 
Town Action Plans have
been developed and
approved for Airdrie,
Bellshill, Kilsyth,
Motherwell, Shotts and
Wishaw.
Town Action Plan
Performance Framework to
be developed with annual
progress reports to be
reported to Enterprise &
Fair Work Committee,
August 2025.
Growth 
2.2 Coatbridge has been
awarded £19.5m in funding
from the UK Government’s
Long-Term Plan for Towns
funding 
A Town Board has been
established and an
Investment Plan has been
drafted. 
Continue to support
Coatbridge Town Board to
deliver on the approved
Long-Term Plan for
Coatbridge 
Finalise Long Term Plan for
Coatbridge and initial 3 year
Investment Plan and submit
to UK Government.
Growth
2.3 NLC acquired The Centre
Cumbernauld in June 2023
with the intention of
demolishing the
megastructure and
redevelop Cumbernauld
town centre.
Continue with The Centre
Cumbernauld project,
including procurement of an
architect led design team
during 2025/26, who will aid
the development of the
Masterplan.
Growth
Page 14 of 100

Page 15

First stage of consultation
and engagement with
businesses and residents
has been completed. 
Conclude the procurement
of the new long-term
management agent for The
Centre Cumbernauld. 
Progress demolition strategy
including procurement of
specialist demolition
consultant
2.4 Between 2010/11 and
2023/24 there
were 1,662 new, social
rented homes delivered
within North Lanarkshire’s
town centres (including
edge of town
developments). 
These properties have been
delivered by
NLC and Registered Social
Landlords (RSLs) .
NLC and RSLs to deliver 59
new affordable
homes within our town
centres (including edge
of town) during 2025/26. 
New Supply
2.5 NLC acquired the former
Motherwell Town Hall from
NLP in 2020.
Appoint main contractor
and commence works on
site to  redevelop the
Category C Listed, former
Motherwell Town Hall to
residential units for social
rent as part of the New
Supply Programme. 
New Supply
Page 15 of 100

Page 16

Commence demolition of
the old main hall and
undertaken external repairs.
2.6 Continue to prioritise funding and
secure external investment for the
regeneration of our town centres.
Placed Based Investment
Programme secured so far:   
• £2.807m in 2021/22
• £2.436m in 2022/23
• £1.698m in 2023/24
• £0.830m in 2024/25
Await confirmation of the
Scottish Government’s
Placed
Based Investment
Programme (PBIP) and
anticipated allocation for
2025/26.
Growth
2.7 £150k secured from Historic
Environment Scotland (HES)
and
National Lottery Heritage
Fund (NLHF) to develop
plans during 2023/24 and
2024/25 to deliver a
heritage-led regeneration
project in Airdrie. 
A final stage application will
be submitted to HES and
NLHF to support the
Rediscovering Airdrie
project.
Submit funding application
to HES and HLF for up to
£2.5m 
Subject to a successful
funding award, commence
delivery of the
Rediscovering Airdrie
project which may include:
• the refurbishment and
enhancement of Airdrie
Library
• a shopfront
improvement scheme
through grants to local
property owners.
Growth 
2.8 Review how the council can be more
effective in addressing failing buildings
in our town centres.
Since 2018/19, 59 town
centre buildings or vacant
sites have been re-
purposed or redeveloped
(including edge of town),
across the authority. 
Continue to engage with
local property / landowners
with a view to acquiring key
town centre properties /
sites earmarked for
conversion /
redevelopment.
Growth & Planning
Page 16 of 100

Page 17

A further 19 properties/sites
have been acquired by the
council with a view to either
converting existing
properties to residential
developments, building new
homes on cleared sites or
upgrading
commercial premises.
Where necessary,
commence CPO processes,
as a last resort, if failure to
purchase a site
would be detrimental to
town centre regeneration
plans. 
Theme: Invest
ERDP Priority 3: Improving our business and industrial infrastructure, creating opportunities for investment and for companies to start-up or relocate
here
Reference No. ERDP Priority What we’ve delivered so
far…
What we’ll aim to deliver
during 2025/26…
Lead Team
3.1 Promoting a mix of development
across our motorway corridors
and accessible business locations to
support the development of our
foundational economy as well as high-
end growth
INVEST HERE website
launched – a promotional
tool to market North
Lanarkshire. 
INVEST digital video
campaign – a series of 7
video interviews featuring
recent NL inward
investment companies
which as so far resulted in
more than 3.7 million
impressions and 20k clicks
across YouTube and
LinkedIn. 
• Delivery of a
relationship managed
service (Invest in NL) to
support businesses
through the statutory
consent process from
enquiry to pre-planning
to operational
establishment 
• Development of Invest
NL Prospectus and
marketing activities
• Mapping of available
key sites and properties 
• Development of
Business and Industry
Strategy which will
Enterprise
Page 17 of 100

Page 18

INVEST brochure created –
providing key data on NL as
an attractive and supportive
inward investment business
location. 
INVEST trade press
advertorial (September
2024) in Commercial
Property Monthly,
showcasing NL’s success in
attracting recent
multimillion pound
company investments. 
inform sites identified
for inclusion in the Local
Development Plan 
• Strengthening links with
North Lanarkshire
Properties and Fusion
Assets to market and
identify and promote
key properties, sites and
opportunities
• Delivery of support for
filming locations and
enquiries through
Lanarkshire Screen
Locations and North
Lanarkshire Film Charter 
3.2 Continuing to support enabling
investment which brings our vacant and
derelict land and brownfield sites into
commercial use
10.29 ha of land remediated
or improved for business
and industry use across
North Lanarkshire between
2018/19 and 2023/24.
1.6 ha of land to be
remediated or improved by
Fusion Assets for business
and industry use in 2025/26.
Fusion Assets
3.3 Improving how we record and respond
to enquiries from businesses to provide
a coordinated approach across relevant
council services to help attract, retain
and expand business and employment
opportunities
A six-month Invest in NL
pilot commenced
September 2023 as part of
the new Programme of
Work. 
The primary aim of the
Invest in NL advisory team is
to facilitate investment
Continue to progress
delivery of the Invest in NL
Programme of Work. 
Continued rollout of a CRM
enquiry system. 
Place 
Enterprise 
Page 18 of 100

Page 19

in NL by providing a co-
ordinated advisory service
to help accelerate the
statutory consent process
for developers. 
CRM system created to
record any business
enquiries and interactions,
including promotional
marketing and onward
referrals. 
3.4 Building upon work which supports
innovation and skill development
through the development of sectoral
learning academies
Three sectoral learning
academies are
being taken forward under
the Brighter Futures
Programme of Work
(Built Environment; Care
and Digital), to
help attract and train a
workforce to meet demand
in these key sectors and
support the local economy. 
Funded projects have taken
place to support employers
fill workforce gaps.  Some
examples are provided
below: 
SP Energy Networks have
employed 14 adult
apprentices on a training
Continue to deliver NL
Academies projects which
are funded via UK Shared
Prosperity Fund (UKSPF) –
subject to allocation of
funding. 
Built Environment
Three priority workstreams
will be progressed; 
• The development and
implementation of
phase 1 of the Built
Environment Academy.
• The development of a
Youth Engagement
Strategy to engage and
attract young people
into the sector. 
• Research into the
current and future
People Resources
Page 19 of 100

Page 20

programme with
guaranteed employment
upon completion.  A further
4 roles are being developed
by end 2024/25. 
47 participants attended
digital training for 16–24-
year-olds with support for 6
months post completion to
enter into an
apprenticeship.  Outcomes
are expected in the first half
of 2025/26. 
15 over 18’s attended a
Futures in Construction
Programme over 12 weeks
with 10 gaining employment
opportunities thereafter. 
Over 350 attendees
participated in Low Carbon
Learning programmes and
Next Gen programmes
supported by BE-ST.  The
participants ranged from S1-
S6 pupils, Pathways and
Virtual Schools participants
and Teaching staff.
The Built Environment
Sector Board and Care
Academy Steering Group are
North Lanarkshire skills
demand and workforce
demand.  This
workstream will also
map the current supply
chain ecosystem to
identify clusters of
expertise, areas of
specialism and potential
for growth. 
Care
The Steering Group will
prioritise activity under 4
workstreams;
• attraction, recruitment,
retention and wellbeing
• pathways to care for
young people
• adult pathways to care
• funding and
procurement. 
A focus on collaborative
apprenticeships is planned,
along with ensuring
pathways for people to work
in the care sector are
developed within these.
Digital
Work will be
progressed to engage with
employers to gain a deeper
Page 20 of 100

Page 21

now established and have
commenced.
understanding of skills and
workforce challenges and
gaps within this industry in
North Lanarkshire to direct
activity towards addressing
these gaps. 
3.5 Supporting investment, via our
Arms-Length External Organisations,
that will continue to improve, modernise
and expand commercial stock availability
across North
Lanarkshire
Planning approval has been
obtained for three phases of
development at
Gartcosh Industrial Park. 
Phase 1 at Gartcosh is
complete with the
construction of 3 industrial
units totalling
60,000 sq.ft of class 4,5 and
6 floorspace. 
Following letting of the 3
units, the Phase 1 was
successfully marketed and
sold as an investment. 
At Ravenscraig, a six acre
development plot was
acquired and a programme
of enabling works
undertaken to create a
development ready site.  
At Link Park, Newhouse a
second industrial building of
During 2025/26 Fusion
Assets will:
• Seek to secure funding
for Phase 2 at Gartcosh
Industrial Park and
commence   
construction of 3 new
industrial units, totalling
69,000 sq.ft.
• Secure planning
approval for Phase 4 at
Gartcosh Industrial Park
which consists of a
40,000 sq.ft single user
site.
• Ravenscraig – Examine
the feasibility of
undertaking a second
phase of development
at the Ravenscraig
Employment Zone.
• Condor park,
Eurocentral – conclude
Joint Venture, secure
funding and commence
construction of
Fusion Assets
Page 21 of 100

Page 22

15,000 sqft was completed
and let resulting in the
creating of 72 additional
jobs in North Lanarkshire. 
41,000sq ft of industrial
space
• Link Park, Newhouse -
Complete construction
of a 19,000 sq.ft
industrial unit which
represents the third and
final phase of
development on the
site. 
Secure share of £64.5m
Glasgow City Region funding
to progress additional
business and industry
regeneration projects at
Ravenscraig and potentially
Cumbernauld and
Chapelhall. 
Page 22 of 100

Page 23

Theme: Invest
ERDP Priority 4: Continuing to improve our connectivity and develop new opportunities by transforming our road, rail and digital infrastructure
Reference No. ERDP Priority What we’ve delivered so
far…
What we’ll aim to deliver
during 2025/26…
Lead Team
4.1 Continue to deliver the City Deal
Infrastructure Programme
Ravenscraig Access
Infrastructure 
Planning approval granted
for new dual carriageway
from Ravenscraig Regional
Sports Facility to
Motherwell at the Airbles
Road/Windmillhill Street
junction. 
Bridge crossing under the
West Coast Mainline
Railway was completed in
2023. 
Land acquisition/ CPOs
concluded.
Demolition works
commenced to former
business sites at Airbles
Road and Windmillhill
Street, due to be complete
January 2025. 
Continue to progress the
delivery of Ravenscraig
Access Infrastructure project
to support the
redevelopment and connect
the M74 and M8 as part of
the Pan Lanarkshire
Transport Corridor. 
• Commence advance
service diversion works
for the road
construction. Finalise
the scope of advanced
groundworks and
commence
procurement. 
• Prepare tender package
for construction of the
dual carriageway
between Ravenscraig
Regional Sports Facility
and Airbles
Road/Windmillhill
Street. 
Enterprise Projects
Page 23 of 100

Page 24

4.2 East Airdrie Link Road 
Preferred option for East
Airdrie Link Road identified. 
Advance ground
investigation works
completed for preferred
route. 
Outline Business Case (OBC)
approved by Glasgow City
Region City Deal Cabinet. 
First Draft of EALR
alignment (preliminary
design fix 1) complete and
public and landowner
engagement taken place. 
Environmental Impact
Assessment Scoping report
submitted to Planning. 
Continue to progress the
delivery of the East Airdrie
Link Road to improve
north/south road and active
travel connectivity as part of
the Pan Lanarkshire
Transport Corridor. 
• Complete preliminary
design for the road
alignment.   
• Commence land
acquisition strategy. 
• Environmental Impact
Assessment to be
completed. 
• Submit Planning
application for the East
Airdrie Link Road. 
• Appoint consultants to
progress design
development of East
Airdrie Link Road active
travel. 
Enterprise Projects  
Page 24 of 100

Page 25

4.3  A8/M8 Corridor Access
Improvements 
Outline Business Case (OBC)
for A8/M8 Corridor Access
Improvements project
approved. 
The Orchard Farm
roundabout project will
support the development of
key business and industrial
sites on the A8/M8 corridor,
with delivery led by a
private sector partnership
(PD Stirling and ID Meiklam
Trust) 
Regular dialogue and
meetings established with
the private sector partners
to discuss and monitor
progress. 
Progress delivery of the
Orchard Farm roundabout
to support the development
of key business and
industrial sites on the
A8/M8 corridor. 
• Finalise a funding
agreement with the
private sector
partnership for the City
Deal contribution to the
project. 
• Maintain regular
dialogue with the
partnership to ensure
progress towards target
procurement and
delivery dates in 2025
and 2026. 
• Start preparing Full
Business Case (FBC) for
submission to the
Glasgow City Region City
Deal Cabinet, once
procurement
programme is finalised. 
Enterprise Projects
Page 25 of 100

Page 26

4.4 Eurocentral Strategic Active
Travel 
Sustainable transport
improvements form part of
the A8/M8 Corridor Access
Improvements project
which has received Outline
Business Case (OBC)
approval 
Options appraisal
undertaken and concept
designs prepared for routes
between Holytown and
Eurocentral/Maxim Office
Park; Holytown and
Newhouse (Phase 1);
Whifflet rail station to
Shawhead (Phase 2). 
Consultants appointed to
prepared detailed designs
and prepare tender
documents for Phases 1 and
2; assess options and
develop concept design for
a route between Bellshill
and Mossend (Phase 3).
Progress delivery of the
Eurocentral Strategic Active
Travel project. 
• Completion of detailed
design and tender
preparation, options
appraisal and concept
design commission. 
• Commence works
procurement for
Holytown to
Eurocentral/Maxim and
Whifflet Corridor routes
and submit sub-project
Full Business Case (FBC)
for approval by the
Glasgow City Region City
Deal Cabinet. 
• Commence
construction. 
• Commence
procurement of detailed
design and tender
preparation services for
Bellshill to Mossend
route. 
Enterprise Projects  
Page 26 of 100

Page 27

4.5 Invest in the delivery of the
council’s Active Travel Strategy to
ensure a comprehensive connection of
active travel routes to key places across
North Lanarkshire
17.2km of active travel
routes created between
2019/20 and end of 
2023/24.
Project examples include
Newhouse to Salsburgh,
South Biggar (Airdrie),
Ravenscraig Active Travel
Link Phase 2, Motherwell
Station Active Travel Phase
1A and Alexander Street
Active Travel (Wishaw).
Continue to develop the
Active Travel Strategic
Network Routes (SNRs), in
line with external funding
resources. 
Progress designs of:
• SNR9 (Airbles Road to
South Lanarkshire at
Strathclyde Park and to
Bothwell)
• SNR7 (Uddingston to
Caldercruix)
• SNR6 (Stepps to
Condorrat) 
• SNR8 (Glasgow City
Council boundary on
A74 to Newhouse)
• SNR1 (Coatbridge to
Muirhead)
• SNR3 (North-South
Corridor) 
Progress delivery of AT
improvements: 
• Glasgow Road Phase 3,
Wishaw (SNR3)
• Alexander Street Phase
2, Wishaw (SNR3)
• Belziehill Roundabout
Phases 1 and 2 (SNR8)
Infrastructure &
Transportation
Page 27 of 100

Page 28

• Riverbank Hub Phase 3
and Orbiston Hub Phase
1 and 2 local links. 
4.6  Ravenscraig Active Travel
Links 
Construction of Phase 1 and
Phase 2 of the Ravenscraig
Active Travel Links project
completed. 
Feasibility Study and
Options Appraisal
commission awarded and in
progress for a further phase
of the project, from the
Employment Access Area to
Coursington Road. 
Motherwell Station Active
Travel Links 
Muir Street (Motherwell Rail 
Station) to Braidhurst
Industrial Estate Active
Travel Links project
completed. 
Detailed design of
Motherwell Rail Station to
the Civic Centre at Camp
Street complete.
Ravenscraig Active Travel
Links 
Subject to securing external
funding, progress Ground
Investigation work and
detailed design for the
preferred option identified
from the feasibility study
and options appraisal
commission, for a route
between the Employment
Access Area and
Coursington Road. 
Motherwell Station Active
Travel Links 
Continue to progress
delivery of the Motherwell
Station Active Travel Links
project. 
• Progress detailed design
of routes sections
between Camp Street
and Airbles Road,
Glencairn Street and
Enterprise Projects
Page 28 of 100

Page 29

Concept design for Bellshill
Road complete. 
Works on West Hamilton
Street route section
complete; section between
Asda and Civic Centre at
Camp Street to commence
in January ’25. 
Feasibility study and options
appraisal for route section
between Camp Street and
Airbles Road and Glencairn
Street underway.
Bellshill Road, subject to
external funding. 
• Deliver works on route
section on Hope
Street/Muir Street,
subject to external
funding.
4.7 Ensure that inclusive economic
growth remains at the heart of
opportunity to support affordable
and accessible transport systems
(via the Local Transport Strategy)
Local Transport Strategy
development commenced
during 2024/25.
Finalise and seek Committee
approval of North
Lanarkshire’s Local
Transport Strategy (LTS)
The LTS will help prioritise
available investment to
ensure communities can
access employment,
education and leisure
opportunities, support
inclusive economic growth
and contribute to reducing
carbon emissions. 
Infrastructure &
Transportation  
Page 29 of 100

Page 30

4.8 Support the delivery of Electric
Vehicle (EV) charging infrastructure and
other green transport solutions across
North Lanarkshire
Progressed work to develop
a Glasgow City Region EV
Charging Strategy
Develop and implement a
Glasgow City Region
approach to appoint a
provider to increase,
manage and maintain public
EV infrastructure.
Community Operations
4.9 Work with the council’s digital partner
to install and invest in infrastructure that
helps create one of the best and most
affordable/accessible digital provisions
in the UK.
Significant progress has
been made against the fibre
rollout to complete the
Wide Area Network (WAN).
This is key to enabling the
provision of internet
services and public wi-fi. 
320km of fibre built to date. 
29 public parks now
connected to the new ultra-
fast fibre backbone
network. 
25 business parks now
connected to the new ultra-
fast fibre backbone
network.
Progress next phase of call
off contracts covering public
Wi-Fi and CCTV services. 
Commsworld and partners
to continue to invest in new
Fibre to the Home coverage
for residents including
Airdrie, Coatbridge,
Motherwell and Shotts. 
Business Solutions
4.10 As part of the Comms World
Framework a number of
community benefits have
been delivered, including: 
• 9 Modern Apprentices
recruited via
NLC/Commsworld
NLC and Commsworld Ltd
will continue to maximise
added value via the
Framework Agreement for
the provision of digital
connectivity services and
associated call-off contracts,
ensuring the delivery of
Business Solutions
Page 30 of 100

Page 31

shared Apprenticeship
Model. 
• Delivery of SmartSTEM
programme across
North Lanarkshire
schools including 2
primary school flagship
events, 2 secondary
school flagship events,
and over 40 individual
primary school
workshops to over 3000
pupils. 
• Development of an
interactive, online map
highlighting
organisations and
venues delivering
community based digital
services and resources
across North
Lanarkshire. 
• Delivery of a flagship
business event
“Accelerate North
Lanarkshire” attended
by 196 people in
Motherwell.
Community Benefits and
additional value throughout
2025/26. 
Page 31 of 100

Page 32

Page 32 of 100

Page 33

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    KH/GR Date 14/02/25 
Smart Parks Update 
From  Katrina Hassell, Chief Officer (Business and Digital)  
E-mail HassellK@northlan.gov.uk Telephone 07903 096121 
1. Background 
1.1 Following extensive market research, a PIN notice and a negotiated tender process, it
was recommended to award a Connectivity Framework to Commsworld Ltd, for an
initial period of 180 months (15 years) with the council reserving the right to extend the
Agreement for additional periods up to a maximum of a further 60 months (5 years).
The value of the Framework Agreement shall not exceed One Hundred and Fifty Million
Pounds Sterling (£150,000,000) exclusive of VAT. 
1.2 To date contracts to the value of c£25M have been awarded via the contract. 
1.3 An intention of the Framework was to provide market awareness and access to
innovative solutions and suppliers in the connectivity technology marketplace.  To aid
this the ITT evaluation process included a quality segment on Innovation, within that an
area asked suppliers to propose and scope proof of concept solutions that utilised
Executive Summary 
This report provides a summary and update of the deployment of Internet of Things (IoT)
technologies via Smart Park Proof of Concepts (POC’S) within two of the Councils country
parks.  Further it explores how the success of these units will be monitored and potential
benefits that may be achieved. 
Recommendations
It is recommended that Enterprise and Fair Work Committee: 
(1) Acknowledge the implementation of these POC’s and consider the potential benefits
associated with their use. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Digital North Lanarkshire
Item 3
Page 33 of 100

Page 34

connectivity, particularly demonstrating how the proposed connectivity network could
be integrated with these solutions. 
1.4 One such solution put forward by Commsworld was that of Smart Parks, introducing
aesthetically pleasing smart hubs, reimaging traditional lighting solutions incorporating
modules that assist park operation and maintenance whilst enhancing the visitor
experience. 
1.5 Following award this concept was further explored through consultation with
Greenspace and Country Parks and ultimately POC’s were agreed for both Palacerigg
and Strathclyde Country Parks. 
1.6 The vendor of the solution is a local company Automomous IoT based in Chapelhall
Industrial Estate. 
1.7 Although the Council is funding these POC’s both Commsworld and Autonomous have
financially invested in them and hope to be able to use as future reference sites for
potential customers as well as demonstrating their successful use to the Council. 
2. Report 
2.1 The POC’s utilise Smart Hub’s housed inside a lighting module with inbuilt solar array
and wind turbine, that allows the units to work off grid if needed, whilst also able utilise
their battery packs to offset main usage for mains connected devices.   The units are
capable of being attached to standard lighting poles, however for the areas picked no
poles existed and hence the POC’s include the installation of concrete plinths and
suitably sized poles. 
2.2 These units house the battery packs but are also capable of accommodating
communication modules, sensors and security functions.  Incorporated into a unit at
each site is an Internet of Things (IoT) gateway that uses LoRaWan (Long Range Wide
Area Network) technology that can be used to connect to remote battery powered
sensors that can capture environmental data that is transmitted back through the
module to a centrally hosted solution that will be utilised to provide trended information. 
2.3 Each deployment also includes at least one WiFi gateway that is connected to the
Councils public WiFi service and direct fibre connectivity has been terminated at each
pole bringing fibre services directly into each park with potential for further future use.
Page 34 of 100

Page 35

Palacerigg Country Park 
2.4 In Palacerigg the installation comprises 3 units strategically placed to enhance the
lighting solutions within the park 
2.5 The units include Public WiFi modules that provide coverage around the play area the
car park and the area in-between.   CCTV cameras within the housing unit also cover
Page 35 of 100

Page 36

these areas, whilst one unit has an IoT gateway in place used to connect remote
sensors. 
2.6 A small water treatment plant exists towards the rear of the park, that requires
monitoring of water quality.  A battery powered turbidity sensor has been installed within
the plant that connects through the IoT gateway to portal that logs and trends turbidity
of the water which provides a measure of water quality. 
2.7 A simple beam sensor has been installed at the car park entrance that similarly uses
the IoT gateway and portal to capture traffic flow into and out of the car park, providing
a simple measure of usage. 
Strathclyde Country Park 
2.8 Three units have been deployed in the over spill carpark area beyond the Water Sports
Centre, this is to enhance the visitors experience with access to Wi-Fi and some
sensitive lighting and CCTV in the area, the increased access to this infrastructure will
allow a more positive experience when attracting events and companies hiring the
venue. 
2.9 Although no IoT sensors have been installed at this time within the Park it is expected
that the understanding gained via Palacerigg will provide background that will inform
further opportunities. 
Delivery to Date 
2.10 Unfortunately, the installations have been beset with deployment problems that have
delayed the delivery, however the experience has been useful in informing the Council
of the range of skills and types of issues faced, these are of course why POC’s are
carried out. 
Page 36 of 100

Page 37

2.11 The units within Palacerigg are now fully operational, whilst at this time (mid December)
Strathclyde Park remains operational off-grid only due to further delays in installation
of mains power. 
Future Opportunities 
2.12 Identifying opportunities for operational efficiency, visitor experience and park
utilisation will be key to determining how the use of technology can grow in these
sectors.   The known issue of algae bloom within bodies of water is well known, similar
to the monitoring of the treatment plant, the lochs water quality requires frequent
testing, this is a time consuming and at cost process, can we use technology to reduce
that impact, and/or raise awareness for visitors. 
2.13 People counters deployed at various waypoints can provide analytical data on usage,
that can be used to predict maintenance requirements or opportunities for engagement. 
2.14 Tracking of equipment can show actual distribution of use as well as security
monitoring. 
2.15 Further environmental sensors such as air quality, ground moisture content, ice
conditions, etc are all available should the organisation identify the need. 
2.16 Ultimately the opportunities for IoT technologies are endless, what these installations
have done is provide that infrastructure to enable future needs, whilst providing an
enhanced experience to these visitor attractions. 
3. Measures of success 
3.1 A single management platform with monitoring and control will allow collation of data
previously unavailable or only anecdotal that can now inform development of the parks.
This wealth of data which will allow us to understand user needs and patterns as well
as a range of environmental factors which we currently must manually collect. Training
has still to be provided on how to use the interface, once this has been completed. We
can fully manage and monitor the POC evaluating the user interaction, environmental
data, and visitor numbers.   
3.2 Main factors to consider: 
• If the collation of data is good and usable.
• How the public interact. (do they use the Wi-Fi)
• CCTV, does this work well with the Community Safety teams current systems
• Do the visitor number increase due to additional lights at the carparks.
• Future event up take with the inclusion of the Wi-Fi on site
• Does turbidity sensor reduce need for in person sampling and testing 
4. Supporting documentation 
None 
Page 37 of 100

Page 38

Katrina Hassell 
Chief Officer (Business & Digital) 
Page 38 of 100

Page 39

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Page 39 of 100

Page 40

Technology impact managed through connectivity contract and has subsequently
engaged in the formal processes for adoption. 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☒ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 40 of 100

Page 41

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    PH/YW Date 14/02/25 
Review of Business Support Services 
From  Pamela Humphries, Chief Officer (Place)  
E-mail weiry@northlan.gov.uk Telephone Yvonne Weir
07508 001238 
Executive Summary
To support local businesses, the council delivers a suite of business support services to new
and existing businesses, key sectors and businesses looking to locate in North Lanarkshire.
This support includes delivery of the Lanarkshire Business Gateway Service, expert help
support, grant funding, activities to support key sectors and support with inward investors and
businesses looking for properties and sites to set-up, grow or expand their business. 
The purpose of this report is to review the delivery of this support to address gaps in provision,
opportunities and challenges to enable and support the continued growth of the local
economy and the creation of employment opportunities. 
The report also includes proposals for amendments and improvements to the current suite of
business grant funding provided by the council based on internal reviews by key Enterprise
Development and Business Gateway staff, and by an independent, external evaluation
carried out in late 2023. 
Recommendations
It is recommended that the Enterprise and Fair Work Committee: 
(1) Acknowledge  the content of the report and the range of activity being undertaken
to support economic growth and entrepreneurship in North Lanarkshire;
(2) Endorse the key deliverables for 2025/26; and
(3) Approve changes to the Business Start-Up Fund and the Business Growth Fund. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (5) Grow and improve the sustainability and diversity of North
Lanarkshire's economy
Programme of Work Brighter Futures
Programme of Work Transforming Places
Programme of Work Invest in North Lanarkshire
Item 4
Page 41 of 100

Page 42

1. Background 
1.1 North Lanarkshire has a diverse and growing local business base. To support local
businesses, the council delivers a suite of business support services to new and
existing businesses, key sectors and businesses looking to locate in North Lanarkshire.
The purpose of this report is to review delivery of this support to address the gaps in
provision, opportunities and challenges to enable and support the continued growth of
the local economy and the creation of employment opportunities. 
1.2 The current services and programmes being delivered include: 
1.2.1 Lanarkshire Business Gateway Service – the service was insourced on 1 March
2024 providing one-to-one advisory support, workshops, specialist surgeries and
networking opportunities to new and existing businesses across Lanarkshire. 
1.2.2 Business Grant Funding – during 2024/25 this has included the delivery of the
Council’s Business Start-Up Fund, the Small Business and Self-Employed Support
Scheme, the Energy Audit Voucher Scheme, the Business Growth Fund, the Tourism
Challenge Fund, and the Net Zero Business Challenge Fund. Across all the Funds
since they were launched in 2023/24, the spend to-date is £822,965 with a further
£981,943 of grant awards made. A further £374,013 of grant requests received are
currently being considered by officers. The grant funds have been supported through
the UK Shared Prosperity Fund and covid recovery funding.   
1.2.3 Expert Help Framework – providing up to five days of specialist consultancy support
to businesses in the areas of Financial Management; Human Resources, Leadership
and Skills; Procurement; Marketing; Information and Digital Technology; Legal Support;
Energy Efficiencies and Net Zero; Business Development; and New Market
Opportunities and Internationalisation. 
1.2.4 Inward Investment and Business Engagement – which includes the delivery of the
Council’s inward investment activities and campaigns, the provision of a single point of
contact for investors and businesses looking to locate in North Lanarkshire or do
business with North Lanarkshire Council, and the provision of free property and land
searches. 
1.2.5 Procurement and Supply Chain Development – this includes the local delivery and
promotion of the national Supplier Development Programme, delivery of the
Lanarkshire Meet the Real Buyer Event, and arranging for bespoke supplier events
linked to key contract opportunities including the 2025-2029 Expert Help Framework. 
1.2.6 Sector-Specific Support – through 2024/25 this has included: 
• Manufacturing – through the continued development and delivery of Smart Hub
Lanarkshire.
• Tourism – through the delivery of the North Lanarkshire Tourism Strategy and
visitor destination marketing via the Visit Lanarkshire brand. 
• Social Enterprise – through the delivery of the North Lanarkshire Social Enterprise
Framework and Action Plan including the delivery of bespoke social enterprise
support. 
• Construction and Built Environment – through the delivery of the Hub South West
Build Lanarkshire programme and work to support the development of the sector
and pathways into the sector particularly for young people and those seeking
employment. 
Page 42 of 100

Page 43

• Digital and Creative – engagement with businesses to address the digital skills gaps
and capabilities, and development of support for the creative sector including the
delivery of Lanarkshire Screen Locations which provides a free support service for
filming enquiries in North Lanarkshire.
• Fair Trade – promotion of Fair Trade across North Lanarkshire to support the
council area’s Fairtrade Zone status, local businesses and communities.
• Food and Drink – support for the development and delivery of Lanarkshire Larder.
• Life Science – direct engagement and officer-led support for the growing sector. 
1.2.7 Development of Entrepreneurship – Through the UK Shared Prosperity Fund, the
Council has delivered bespoke community-based advice and support to individuals who
typically experience structural barriers to self-employment or running their own
business. This support includes the development of the Hive for women entrepreneurs
in Airdrie and tailored business support to Minority Ethnic communities. 
1.2.8 Development of the Young Entrepreneur – working with education to develop and
deliver pathways into entrepreneurship for young people including the delivery of the
annual Dragons’ Lair Competition for teams of S3 pupils across North Lanarkshire. 
Overview of the Business Sector in North Lanarkshire 
1.3 The most recent 2024 Business in Scotland figures produced by the Scottish
Government highlight that the number of registered private sector businesses in North
Lanarkshire stood at 8,385 during 2024. This represents 4.8% of Scottish based
businesses. 
1.4 With 8,385 businesses in 2024, this represents an increase of 60 businesses since
2023 (+0.7%). This is similar to the wider Scottish picture, which saw an increase of
0.4%. Comparing over the last decade (2014-2024), North Lanarkshire's business base
has increased by 1,020 businesses (+ 13.8%). This is significantly higher than the
growth in business numbers Scotland has experienced over the same time period
(+4.5%). 
1.5 North Lanarkshire's 8,385 businesses have a combined turnover of £17.283 billion.
This accounts for 5.1% of Scotland's total turnover. This highlights a good performance
of North Lanarkshire's businesses. It represents a significant increase in turnover of
£2.21 billion since 2023 (+14.7%). However, this is slightly less than the Scottish
increase in turnover of 18.7%. 
1.6 North Lanarkshire's 8,385 businesses employed 97,960 people in 2024. This is an
increase of 440 people (+ 0.5%) employed by our private sector enterprises since 2023.
Despite the increase in employment, this has yet to return to pre-pandemic levels which
saw 98,720 people employed by North Lanarkshire based enterprises in 2019 and over
100,000 in 2020. 
1.7 North Lanarkshire has a lower proportion of small enterprises than Scotland and a
larger share of medium and large enterprises than Scotland. This is demonstrated in
the table below: 
Page 43 of 100

Page 44

Area Business size (employees)
Small enterprises 
(0-49 employees)
Medium enterprises
(50 - 249 employees)
Large enterprises
(250+ employees)
North
Lanarkshire
89.8% 4.0% 6.1%
Scotland 96.3%  2.2% 1.4% 
1.8 In terms of self-employment, the latest statistics from the Office of National Statistics
(ONS) Annual Population Survey indicate that 9.9% (15,500) of North Lanarkshire
working age residents (aged 16-64) who are in employment are self-employed. This is
less than the Scottish figures of 11.0% and the UK figure of 12.2%. There is a significant
gender difference. Of the 15,500 self-employed, 11,300 are males which equates to
13.2% of all males who are in employment. This is similar to the Scottish figure of 13.4%
but below the UK figure of 15.0%. In North Lanarkshire women are under-represented
in entrepreneurship.  There are 4,200 females aged 16-64 in North Lanarkshire
classified as self-employed. This is 3.8% of the entire female working age population
and 5.9% of all North Lanarkshire females who are actively working. The North
Lanarkshire figures are far less than the Scottish averages whereby 6.2% of all females
aged 16-64 are self-employed and 8.6% of all Scottish females who are actively
working. (Annual Population Survey, ONS (July 2023 – June 2024 data). 
1.9 Furthermore, the number of new business starts per 10,000 working age population
(2023) indicated that there were 48 new starts in North Lanarkshire compared to
Scottish figure of 52. In relation to 3-year business survival rates, over the period 2020-
2023, the North Lanarkshire rate was 51.5% which was lower than the Scottish rate of
56.0%. 
1.10 Between 2023 and 2024, the number of small businesses (employing 0-49 people)
recorded an increase of 55 businesses (+0.7%) and medium sized businesses
(employing 50-249 people) also recorded a slight increase of 5 businesses (+1.5%).
With 515 large businesses (employing 250+ people) recorded in 2024, this represents
no change over the last year. Scotland wide, there was a 2% increase in the number
of large businesses. 
1.11 In 2023 Construction overtook Wholesale, Retail and Repairs as the largest sector
within North Lanarkshire in terms of number of businesses. This held during 2024 with
1,560 Construction businesses employing 13,660 individuals with a combined turnover
of £2.7bn now based here. Construction businesses represent 18.6% of all North
Lanarkshire based businesses and around 7% of Scotland's total Construction sector
businesses. The North Lanarkshire Construction sector saw a 9.5% increase in
employment between 2023 and 2024. 
1.12 Wholesale, Retail and Repairs which represents 18.0% of businesses (1,510
enterprises) with 20,450 individuals employed within this sector. This accounts for
17.7% of private sector employment within the area. Despite remaining the largest
employment sector - this has decreased between 2023 and 2024 with 1,040 fewer
employees. This is a 4.8% reduction in employment over the last year, higher than the
Scottish decrease of 1.6%. The Wholesale, Retail and Repairs sector has the largest
combined business turnover of £4.8 billion - 28% of North Lanarkshire's total business
turnover and an increase of £338m over the last year (+7.5%). 
Page 44 of 100

Page 45

1.13 In 2024, NL has 690 Transport and Storage businesses, employing 9,300 people, with
the sector generating £1.188 billion in turnover.  While the number of people employed
in the sector decreased by 1,030 since 2023, business numbers and turnover
generated have both grown on 2023 figures (670 businesses and £1,080 billion
turnover). Looking back over the last 10 years, North Lanarkshire’s Transport and
Storage sector has grown substantially from 490 recorded businesses, employing
7,510 people and generating £833m in Turnover in 2014.  
1.14 In 2024, NL has 550 manufacturing businesses, employing 11,810 people, with the
sector generating £2.854 billion in turnover. Since 2023 the number of manufacturing
businesses has remained the same while employee numbers and turnover generated
have both increased from 2023 figures of 11,450 employees and £2.405 billion. In 10
years, the number of manufacturing businesses in North Lanarkshire’s economy has
increased by 40, employment has decreased from 12,890 along with turnover
generated by the sector which in 2014 was £2.981 billion. 
1.15 From the available statistics, knowledge of current economic trends and engagement
with local businesses, there is a clear requirement to continue to focus efforts on
developing a culture of entrepreneurship and measures to encourage more individuals
to consider becoming self-employed and setting up their own business to reduce the
gap in business starts per 10,000 population and improve North Lanarkshire’s business
birth rate. This is particularly the case for women and other groups with barriers to
participation. Aligned to this is the need to support more businesses to survive to reduce
the gap in 3-year survivability persistent in North Lanarkshire. 
1.16 In relation to the growth sectors, the research and statistics are highlighting
considerable areas of opportunity across a range of sectors particularly within the life
science, advanced manufacturing, construction, transport and logistics and food and
drink sectors in North Lanarkshire, alongside the cross-cutting areas of skills,
digitisation and net zero. 
1.17 The review of business support services has sought to consider the following areas: 
▪ How the Council engages with businesses to improve coordination across services 
▪ How the Business Gateway service is integrated with existing business support
structures
▪ How the services provided meet gaps in provision and complement services
delivered by partners and other agencies 
▪ How bespoke support to businesses looking to set up and locate or expand in North
Lanarkshire is delivered 
▪ How entrepreneurialism is promoted in North Lanarkshire to raise business birth
and survivability rates 
▪ How businesses are supported to improve their digital capabilities 
▪ How businesses are supported to reduce their carbon emissions and achieve net
zero 
▪ How to engage businesses in Community Wealth Building 
▪ How to better understand and help meet the skills and employment needs of
businesses to improve access to employment, training, and work experience
opportunities for residents and young people
▪ How we improve the measurement of outputs and outcomes of the services
delivered 
1.18 The review has also included a review of grant eligibility and criteria based on internal
and external evaluations of the funding programmes.
Page 45 of 100

Page 46

2. Report 
2.1 Moving forward the business support from the council requires to be more clearly
focussed on alignment to the Plan for North Lanarkshire and associated Programmes
of Work, addressing gaps in provision, and areas of growth and opportunity. Support
will also be closely aligned to adoption of a Community Wealth Building approach to
economic development. 
2.2 As previously reported, the Lanarkshire Business Gateway service was insourced on 1
March 2024. The service has settled in well and has been improving integration and
alignment with the Enterprise Development team activities and across a range of other
council services and local partners. Work is continuing to take place to improve
alignment to local priorities and meet the needs and demands of local businesses and
those seeking to set-up in business, and to continually improve the services delivered.
Recent satisfaction statistics from customers have been extremely positive. A review
of the operating model is currently underway to look at what changes are required and
improvements that can be made to the model. 
2.3 Business continue to face challenging and uncertain trading conditions moving into
2025. Many of these challenges are consistent across all sectors including continued
cost pressures, access to finance, skills shortages, hard to fill vacancies, low
productivity, and lack of investment in skills, Research and Development and
innovation. The provision of a mix of advisory, expert help, and funding support will be
critical moving forward supported by bespoke key sector interventions to understand
and address these challenges. 
2.4 As outlined in the background to this report, there continues to be a lower than average
business birth rate and levels of self-employment in North Lanarkshire particularly for
women. As a result there needs to be a continued focus on developing an
entrepreneurial culture particularly through educational pathways, providing robust new
start business support with a focus on those facing barriers and the provision of start-
up funding alongside activities to improve the survivability of business starts. 
2.5 Digital capabilities, skills and adoption continue to be a barrier to growth for local
businesses and in particular the rapid growth of areas such automation, artificial
learning and machine learning. Cyber security remains a major risk for businesses of
all sizes and awareness raising and training in this area will be vital moving forward to
ensure businesses have appropriate cyber strategies in place. Businesses will also
require continued support to enable the investment in innovation and technology to
improve their efficiency and productivity. 
2.6 There are also many opportunities which require to be capitalised through the business
support delivered. These include: 
2.6.1 Promotion of Key Sites and Investment – With a considerable amount of affordable
marketable land and strong transport links, North Lanarkshire remains in a strong
position to attract businesses to invest and grow in the area. However, industrial
vacancy rates (currently 2.3%) remain at near record lows amid positive demand
alongside low levels of speculative development.  The market for larger warehouses is
particularly tight. Vacancies in the 50,000 sq ft + size bracket are below 2% and
projected to fall further. New construction faces barriers from high interest rates
alongside elevated build costs (CoStar Group, May 2024). Essential to addressing the
opportunities and indeed challenges, will be the ongoing marketing of the area and also
Page 46 of 100

Page 47

the development of the Business and Industry Strategy and the next Local
Development Plan.  There will also need to be stronger connections to maximise
opportunities through Fusion Assets and North Lanarkshire Properties, as well as  land
owners and property agents to ensure that North Lanarkshire continues to have the
correct mix of land and properties to meet current and future requirements. With
industrial vacancy rates at low levels, bringing new sites and properties to the market
and improving existing properties and sites to ensure they are fit for purpose will be
critical moving forward. 
2.6.2 Support for Key Sectors – Developing a deeper and clearer understanding of the
challenges and opportunities facing key sectors across North Lanarkshire will also be
critical. This will require improved engagement across those sectors, partners and
industry bodies to develop bespoke activities and plans for those sectors. 
2.6.3 Support for Net Zero – There is a strong opportunity to support businesses to adopt
or develop new processes, products, systems and models to address rising energy
costs, reduce energy use, adopt renewable energy sources, increase recycling, reduce
waste, support decarbonisation, tackle climate change, and to upskill existing staff and
create new green jobs. To remain competitive and to support the meeting of local and
national net zero targets, there is much work to be done to engage and support
businesses in this area. 
2.7 The following table summarises the opportunities and challenges, key business support
deliverables and key measures of success that will be put in place from 1 April 2025: 
Opportunity/Challenges Key Deliverables 2025/26 Outputs/Outcomes
Inward Investment and
Promotion 
Aim: To develop,
promote and showcase
North Lanarkshire as a
key location to invest,
create employment and
do business
• Delivery of a relationship
managed service (Invest in NL)
to support businesses through
the statutory consent process
from enquiry to pre-planning to
operational establishment 
• Development of Invest NL
Prospectus and delivery of
associated marketing activities
and campaigns
• Mapping of available key sites
and properties 
• Development of Business and
Industry Strategy
• Strengthening links with North
Lanarkshire Properties and
Fusion Assets to market and
identify and promote key
properties, sites and
opportunities
• Delivery of support for filming
locations and enquiries through
Lanarkshire Screen Locations
and North Lanarkshire Film
Charter
• Delivery of Lanarkshire Business
Excellence Awards 2025 
• Number of enquiries
(including film
enquiries)
• Number of successful
enquiries (i.e business
who invest/expand in
North Lanarkshire_
• Mapping of enquiries
• Proposed Jobs
• Actual Jobs (measured
at 12-months post
investment)
• Investment in North
Lanarkshire (£)
(including filming
investment)
• Income generated
(through filming and
Lanarkshire
Excellence Awards) 
Page 47 of 100

Page 48

Entrepreneurship 
Aim: To increase the
levels of self-employment
and new business
creation in North
Lanarkshire to address
low levels of business
birth rates and improve
survivability
• Delivery of one-to-one advisory
support, workshops, specialist
surgeries and networking
opportunities through the
Lanarkshire Business Gateway
service
• Delivery of support and review of
provision to Minority Ethnic
Communities
• Delivery of the Hive Business
Centre for Women in Airdrie
• Delivery of support to increase
female entrepreneurship
• Delivery of entrepreneurial
support to young people in
schools
• Delivery of start-up funding
• Delivery of support for new
inclusive and democratic
business models (social
enterprises, employee-owned
businesses and co-operatives) 
• Number of new
business starts
• Number of new starts
still trading at 12
months
• Value of start-up
grants delivered
• Forecast jobs and
actual jobs created
after 12 months of
grant support
• Forecast turnover and
actual jobs created
after 12 months of
grant support
• Number of young
people supported
through enterprise
activities within
schools
• Increase in the number
of women becoming
self-employed or
setting up in business
• Increase in the number
of people from minority
ethnic groups
becoming self-
employed or setting up
in business
• Increase in the number
of social enterprises,
employee-owned
businesses and co-
operatives 
Sustainability and
Growth of Existing
Businesses 
Aim: To increase the
sustainability, growth and
job creation of existing
businesses 
• Delivery of one-to-one advisory
support, workshops, specialist
surgeries and networking
opportunities through the
Lanarkshire Business Gateway
service
• Delivery of Lanarkshire Expert
Help Framework
• Delivery of grant funding to
support investment in capital
expenditure, infrastructure,
digitisation, skills, and net zero 
• Continued joint working and
referrals to key internal services
and external partners to support
growth
• Number of existing
businesses supported
• Value of grant support
delivered
• Forecast jobs and
actual jobs created
after 12 months of
grant support
• Forecast turnover and
actual turnover
generated after 12
months of grant
support 
• Increased participation
in Supplier
Development
Page 48 of 100

Page 49

• Assistance through Invest NL to
find sites and properties 
• Delivery of procurement training
and access to procurement and
supply chain opportunities for
SMEs and social enterprises
through Lanarkshire Meet the
Real Buyer, bespoke supply
chain events and the Supplier
Development Programme 
Programme training
and events
• Increase in the number
of SMEs and social
enterprises accessing
North Lanarkshire
Council procurement
opportunities
• Annual tracking of
businesses, jobs and
turnover through
Business in Scotland
statistics 
Key Sector
Development 
Aim: To increase
understanding North
Lanarkshire’s key sectors
to support their long-term
sustainability and growth,
and to understand their
current and future skills
and employment
requirements 
Focus on:
• Construction
• Manufacturing
• Transport and
Logistics
• Food and Drink
• Life Sciences
• Creative Industries
• Renewable Energy 
• Health & Social Care
• Tourism & Hospitality
• Social Enterprises 
• Increased sector engagement
with businesses and supporting
partners and industry bodies
• Mapping of key sectors and
businesses
• Development of key sector
action plans
• Delivery of the North Lanarkshire
Tourism Strategy and Action
Plan 2022-2026
• Promotion of North Lanarkshire
as a key visitor destination
through Visit Lanarkshire
• Delivery of the North Lanarkshire
Social Enterprise Framework
2021-2026
• Delivery of 2025 cohort of Build
Lanarkshire programme in
partnership with South
Lanarkshire Council and Hub
South West
• Engagement and participation in
workstreams of the North
Lanarkshire Construction Board
• Review of support to Lanarkshire
Larder
• Leading on the implementation
of North Lanarkshire’s Fairtrade
status
• Input to the development and
implementation of the North
Lanarkshire Good Food Nation
plan 
• Number of businesses
engaged
• Increase in visitor
numbers to North
Lanarkshire
• Increase in visitor
spend to North
Lanarkshire
• Increase in number of
social enterprises in
North Lanarkshire
• Annual tracking of
businesses, jobs and
turnover through
Business in Scotland
statistics
• Referrals for
employment, training,
apprenticeship and
work experience
opportunities for
residents and young
people 
Digital 
Aim: To support
businesses to adopt new
digital technologies,
• Delivery of Lanarkshire Expert
Help Framework Lot 6:
Information Technology and
Digital
• Number of businesses
engaged and
supported through
digital activities
Page 49 of 100

Page 50

enhance digital skills and
capabilities, and
implement cyber security
strategies and measures.
• Delivery of grant funding
programmes
• Delivery of bespoke marketing
and awareness campaigns 
• Value of digital support
provided
Support for New Zero 
Aim: To support
businesses to adopt or
develop new processes,
products, systems and
models to support the
journey to net zero and
to create green jobs 
• Review of the North Lanarkshire
Energy Audit Voucher Scheme
• Delivery of Lanarkshire Expert
Help Framework Lot 7: Energy
Efficiency and Net Zero
• Delivery of grant funding
programmes
• Delivery of bespoke marketing
and awareness campaigns 
• Number of businesses
engaged and
supported through net
zero activities
• Value of net zero
support provided
• Quantification (where
practical) of
measurable impact
(e.g. costs savings,
jobs created, reduction
in emissions, reduction
in waste etc) 
2.8 Work will be undertaken during 2025 to adopt a benefits realisation approach to
understand the financial and non-financial benefits which contribute to the delivery of
The Plan for North Lanarkshire and associated Programmes of Work. An online system
has also been developed to enable improved coordination of enquiries and manage
referrals to other services across the council. 
Review of Grant Funding 
2.9 As outlined in Section 1 of the report, the council has operated a series of grant funds
for businesses for a number of years. These funds have been reviewed both internally
through staff workshops, and through an external evaluation by EKOS Ltd between
June and December 2023. The external evaluation covered the business grant
schemes which had been in place between 2015 and 2023. 
2.10  The external evaluation found that:
• The grant schemes have broadly been an effective mechanism to support business
start-up, development and growth and have also broadly supported the right types
of people, businesses, and activities. 
• The grants were pitched at the right level of grant award 
• The grants are valued by new starts and existing businesses and stakeholders
alike. 
• There is a clear and continuing strategic rationale for the provision of grant support
for business development and growth. 
• The grant schemes have made a strong contribution to policy priorities such as: 
• Promoting and supporting the growth of entrepreneurship across North
Lanarkshire. 
• Supporting business resilience and growth. 
• Creating more jobs.
• Feedback from grant recipients was largely positive and the grant schemes are
generating value and impact.
• There were high levels of satisfaction among grant receipts. 
Page 50 of 100

Page 51

2.11 The evaluation also identified that further work was required improve the reach and
penetration rate of the grants, and to take steps to improve the additionality of the
grants and to collect more robust monitoring information from business. 
2.12 By 2028, the evaluation forecast that NLC’s Business Support Funds for existing
businesses will generate a Return on Investment of 12.4. This means that for every £1
of grant money awarded an additional £12.4 in net additional GVA within North
Lanarkshire will be generated. For grants to start-ups the Return on Investment was
4.7. 
2.13 The evaluation made a series of recommendations to identify opportunities and to
address issues and challenges with the funds including: 
• Revisiting the aims, objectives, and outcomes of its replacement business start-up
and growth grants schemes to provide renewed clarity on the purpose of each of
the Funds, and what they are seeking to achieve before devising/
formulating/revising the solutions. 
• Review application and appraisal forms to ensure that applicants are asked the
right questions and are asked to provide supporting evidence for appraisers to be
able to use the information collated to undertake an informed and verified
assessment of evidence of need. 
• Formal appraisal training could be considered.
• Improve marketing and promotion of the grant schemes – to broaden reach and
awareness, to stimulate demand, as well as to increase penetration rates among
existing micro businesses and SMEs. 
• Consider a shift from the current largely transactional grant led support model, to
an account managed, relationship driven or a place-based approach. An account
management approach for existing businesses would lend itself well to the potential
for discretion for priority (or strategic) projects.
• In terms of resource allocation, business advice and grant support to pre-starts,
new starts and volume businesses should be much more light touch, small awards,
and focussed on helping pre-starts commence trading, and helping new-starts and
volume businesses gain skills and sustain trading. 
• More intensive engagement with new starts with the potential to scale up activity
as well as supporting existing businesses with growth potential for progression up
the growth pipeline. Businesses showing growth potential could then have access
to the greater levels of grant funding and other forms of support. 
2.14 A further independent evaluation of the current grant schemes is being undertaken by
external consultants through the UK Shared Prosperity Fund. Any recommendations
from this will be taken into account and changes made as appropriate to the schemes.
A subsequent internal review of the Energy Audit Voucher scheme will also take place
in 2025.
2.15 In line with both the internal review with staff and the evaluation recommendations it is
proposed that the following amendments are made to grant funds with effect from 1
April 2025. 
Page 51 of 100

Page 52

Business Start-Up Fund
2.16 It is proposed to merge the current Business Start-up Fund and the Small Business
and Self-Employed Support Scheme into a single, more streamlined and simplified
Fund to support pre-start, self-employed and small businesses who have been trading
for a period of up to a maximum of 12-months. The current Business Start-Up Fund
supports pre-start businesses with up to £1K if home based and up to £2,500 if
operating from commercial premises and/or with employees. The current Small
Business and Self-Employed Support Scheme provides support of up to £1,000 for
self-employed individuals with no employees and up to £3,000 for businesses with
more than one full-time employee. This leaves a gap in provision for businesses
between 0 and 3-months which is a critical time in the business life cycle.
2.17 The purpose of the Business Start Up Fund is to provide grant funding to help pre-start
businesses with a robust and viable business idea to start trading earlier than would
otherwise be possible, and to support early-stage businesses to grow by creating or
safeguarding jobs and improving the viability of their business.
2.18 The Fund would support essential business purchases up to a maximum of 10 items,
such as IT equipment, capital expenditure, infrastructure, website design, training/skills
development, attending trade shows/exhibitions and stock costs. It will not be geared
towards addressing working capital requirements. 
2.19 The Fund would provide 100% funding up to £3,000 on a tiered basis as follows:
• Grant funding of £1,000 for home-based businesses with no employees.
• Grant funding of up to £3,000 for businesses who are taking on employees,
premises or who will be VAT registered.  
2.20 To be eligible, the business would require to be a full-time business and be working
with a Business Gateway Adviser with a clear business plan or action plan in place.
This will also ensure appropriate aftercare is in place to support the business as it
grows. The Fund will focus on higher value / quality starts that are likely to grow
headcount and provide a future Return on Investment.
2.21 Where businesses are employing staff, they will be expected to be paying the Real
Living Wage, meet the effective voice condition and be committed to the wider Fair
Work First principles. Limited exceptions will only be considered on a case by case
basis in line with Scottish Government Supporting Guidance where the potential grant
recipient genuinely cannot afford to pay the Real Living Wage to part(s) or all of its
workforce.
2.22 Projects that have already started and purchases that have already been paid for (prior
to a decision on the application) will be ineligible. The grant will require to be claimed
within 6 months of the award date (or earlier subject to external funding requirements),
and only after the project has been completed and all suppliers have received payment
in full.
2.23 Businesses supported will be required, as a condition of grant, to provide impact
information on employment and turnover 12-months after support.
Business Growth Fund
2.24 The Business Growth Fund (BGF) is a competitive, discretionary grant fund targeted
at new and existing SMEs (less than 250 employees) to support the strategic, long-
Page 52 of 100

Page 53

term sustainability and growth of the business. Currently the Business Growth Fund
cannot support businesses trading for less than 12-months. It is proposed that for
businesses trading less than 12-months, the Fund will be extended to provide support
to new businesses which can demonstrate scalability of the business and high growth
potential aligned to the Business Gateway growth categorisation of turnover above
£200K within a 3-year period. The impact of the business project seeking support on
improving business turnover, job creation, productivity, environmental sustainability,
and digital capabilities will be of particular importance. 
2.25 The Fund will continue to be focussed on business operating within the following key
sectors – Construction, Manufacturing, Life Sciences, Transport & Logistics, Tourism,
Creative Industries, Digital, Renewable Energy, and Health & Social Care. Social
Enterprises will also continue to be eligible. A new discretionary element will be
available to support businesses with priority or strategic projects aligned to key council
objectives in other sectors. The Tourism Challenge Fund and Net Zero Challenge Fund
which operated in 2024/25 will also be mainstreamed into the new Fund.
2.26 The Fund will move away from speculative enquiries and applications to supporting
businesses who are committed to engaging with the council and its wider services.
Businesses must be working with a Business Gateway Adviser and/or Enterprise
Development Officer within the Enterprise Team and have a business plan or project
plan with an associated detailed action plan in place demonstrating clear links to wider
economic development objectives, employment, sustainability and growth.
2.27 The Fund will contribute towards project-related costs associated with capital
expenditure, infrastructure improvements, training/skills development, consultancy,
and attending trade shows/exhibitions. It is not geared towards addressing working
capital requirements.
2.28 Business Growth Fund grants can provide up to 50% towards eligible project costs (ex
VAT) with the following funding caps in place: 
• Capital expenditure - £20K cap – focussed on jobs, productivity, net zero and
Digital/Ecommerce/Connectivity outcomes
• Infrastructure improvement - £20K cap – focussed on jobs, premise expansion /
adaptation for growth, efficiency, productivity outcomes
• Workforce Skills Development - £5K cap – focussed on people, process and system
development to improve workforce efficiency, productivity, upskilling of staff. This
will include support towards ISO accreditations.
• Trade Shows/Exhibitions - £4K Cap – focussed on growth and accessing new
markets
2.29 Whilst the current fund increased the funding cap to £50K, the current average grant is
less than £20K. It is therefore proposed to reduce the cap back to £20K to enable more
business to receive support. Businesses will be restricted to a maximum of 2 Business
Growth Fund grants in a rolling 24-month period.
2.30  Businesses will be required to clearly evidence need for funding and sources of match
funding for the grants. 
2.31 Businesses seeking grant of £10,000 or more must be able to demonstrate how they
propose to provide community benefits within North Lanarkshire by committing to
additional activities which will benefit local communities, residents or businesses. For
example, this could include the provision of work experience placements for young
Page 53 of 100

Page 54

people or those seeking employment, or, the provision of support through volunteering
or the supply of materials for local community projects.
2.32 Projects that have already started/purchases that have already been paid for (before a
decision on the application) will be ineligible. The grant must be claimed within 12
months of the award date, and only after the project has been completed and all
suppliers have received payment in full.
2.33 Where businesses are employing staff, they will be expected to be paying the Real
Living Wage, meet the effective voice condition and be committed to the wider Fair
Work First principles. Limited exceptions will only be considered on a case by case
basis in line with Scottish Government Supporting Guidance where the potential grant
recipient genuinely cannot afford to pay the Real Living Wage to part(s) or all of its
workforce.
2.34 Projects that have already started and purchases that have already been paid for (prior
to a decision on the application) will be ineligible. The grant must be claimed within 6
months of the award date (or earlier subject to external funding requirements), and only
after the project has been completed and all suppliers have received payment in full.
2.35 To improve consistency of appraisals and decision making, a monthly panel will be
convened to consider all applications received. An appeals process will also be put in
place.  
2.36 Businesses supported will be required, as a condition of grant, to provide impact
information on employment, turnover and other Key Performance Indicators agreed in
the offer of grant letter 12-months after support.
Conclusion
2.37 As outlined above, North Lanarkshire remains a key location for businesses. In order
to capitalise on opportunities and challenges, the deliverables outlined in this paper
provide a framework for the delivery of business support from 1st April 2025 which can
be delivered within current staff and financial resources. 
3. Measures of success 
3.1  The measures of success are all detailed in the table within section 2.7 of the report. 
3.2 The following health check indicators will also be considered to measure success: 
C16: Growth in Gross Value Added (GVA) 
C17: Gross weekly pay (residents) – full time employees
C18: % of all people economically active in employment (16-64 years)
C19: % of the VAT/PAYE registered business that survive for at least 3 years
C27: Total employment in sustainable tourism as % of growth sector
C28: Gross Value Added per head in sustainable tourism (employment)     
Page 54 of 100

Page 55

4. Supporting documentation 
n/a 
Pamela Humphries
Chief Officer (Place)  
Page 55 of 100

Page 56

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Funding to support the activity will be met from existing budgets, earmarked
reserves and external funding through the UK Shared Prosperity Fund. 
Budgets for 2025/26 for the grant funds are anticipated to be as follows:
• Business Start-Up Fund - £150,000
• Business Growth Fund - £1,000,000
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
Page 56 of 100

Page 57

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
A key focus of business support activity will be supporting businesses to improve
their digital capabilities, adoption of new technologies, improving digital
infrastructure, Artificial Intelligence, data, robotics, automation and protection
against cyber-crime. 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☒ 
If Yes, please provide a brief summary of the impact? 
A key focus of business support will be supporting businesses to improve their
energy efficiency, reduce energy costs, adopt new green technologies, adopt
renewable energy, reduce waste and increase recycling. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The support provided will be actively marketed through marketing plans including
the development of marketing materials, online information, social media, case
studies, events and engagement with businesses.
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Risk registers are in place for the service. Key risks include:
• Demand for services – past experience, evaluations and continued
engagement with businesses demonstrates ongoing demand for services.
• Loss of skilled staff 
• Availability of funding – there is a reliance on one-off funds and external funding
e.g. UK Shared Prosperity Fund to support project delivery.
• Prevention of fraud – robust grant appraisal and monitoring checks are in place.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒
Page 57 of 100

Page 58

If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 58 of 100

Page 59

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    PH/SH Date 14/02/25 
External Funding Update Report 
From  Pamela Humphries, Chief Officer (Place)  
E-mail Hodges@northlan.gov.uk Telephone Stuart Hodge, 07583 091571 
Executive Summary 
This report provides an update to Committee on the Council’s recent progress in developing
and securing external funding for physical regeneration projects across North Lanarkshire
including the UK Government’s Long-Term Plan for Towns; Scottish Government’s Vacant
and Derelict Land Fund, and heritage funding programmes managed by Historic Environment
Scotland and National Lottery Heritage Fund. 
The report also seeks approval for the reallocation of VDLF grant monies towards a new
feasibility study and details the proposed 2025/26 Vacant and Derelict Land Fund (VDLF)
allocation of £1.896m, and proposed projects to be supported, subject to submission and
approval by the Scottish Government of a Local Delivery Plan.  
Recommendations 
It is recommended that the Enterprise and Fair Work Committee: 
(1) Approve the additional project for inclusion within the 2024/25 Vacant and Derelict
Land Fund and the proposed projects for inclusion within the 2025/26 Vacant and
Derelict Land Fund.
(2) Acknowledges the update on progress regarding the allocation of £19.51m over 10
years to Coatbridge through the UK Government’s Long-Term Plan for Towns. 
(3) Acknowledges progress with progressing heritage funding bids for projects in Airdrie,
Summerlee Museum and Palacerigg Country Park. 
(4) Acknowledges the award of £250,000 from National Lottery Heritage Fund to
establish a new heritage network for North Lanarkshire.
(5) Acknowledges the current position regarding the Scottish Government’s
Regeneration Capital Grant Fund and the Vacant and Derelict Land Investment
Programme. 
(6) Acknowledges the current position regarding the future allocation of funding from the
Scottish Government’s Place Based Investment Programme for 2025/26. 
(7) Acknowledges the award of £830,000 from the 2024/25 Place Based Investment
Programme for the redevelopment of Strathclyde Park. 
Item 5
Page 59 of 100

Page 60

1. Background 
1.1 The Council aims to secure external funding to support the physical, social and
economic regeneration of North Lanarkshire, with regular updates made to committee. 
1.2 There has been significant recent activity across a range of funding streams. This report
provides an update on progress towards securing a range of funds to support the social,
physical and economic regeneration of North Lanarkshire. 
2. Report 
Current Timescales 
2.1 This report provides an update on current external funding activity, including recent
funding bid submissions and decisions. 
Vacant and Derelict Land Fund (VDLF) 
2.2  Since 2006, North Lanarkshire Council has received funding through the Scottish
Government’s Vacant and Derelict Land Fund (VDLF) Programme to support the
remediation and re-use of long-term vacant and derelict land sites within North
Lanarkshire. The award of this annual grant is subject to the submission of a VDLF
Local Delivery Plan (LDP) and its approval both by committee and the Scottish
Government. 
2.3  The VDLF is a ring-fenced annual capital grant allocation which provides financial
support from the Scottish Government to assist with the regeneration of registered
vacant and derelict land (V&DL) sites across selected local authority areas. Funding
provided through the VDLF Programme is subject to the submission and approval by
the Scottish Government of a LDP which sets out local authority investment proposals
to meet the objectives of the VDLF Programme. 
2.4  These objectives are to:-
• tackle long term vacant and derelict land (and in particular sites which have been
registered as vacant or derelict for at least 15 years); 
• stimulate economic growth and job creation; 
• develop a diverse sustainable environment with a focus on temporary and
permanent greening; and 
• support communities to flourish and tackle inequalities. 
2.5  There is a range of activity which this fund cannot support including major infrastructure
works, retail and housing projects. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement
(2) Refocus our town centres and communities to be multi-
functional connected places which maximise social, economic, and
environmental opportunities
Programme of Work Transforming Places
Page 60 of 100

Page 61

2.6 Fusion Assets previously purchased land within the Commercial Zone in Ravenscraig
in September 2023 and a contract to undertake enabling works to facilitate a
development ready plot has been let. 
2.7 The opportunity exists for Fusion to acquire an adjacent site to expand the scope of the
proposed development and create further development ready plots. A feasibility study
and ground investigation would be required to consider if the site was suitable for
development. 
2.8 To facilitate this, Fusion propose to reallocate underspend from two existing VDLF
projects to enable the feasibility study to proceed - £15,000 of uncommitted funds from
the Ravenscraig Renewables Study budget and £23,000 from the Brownfield Land
Feasibility Studies budget. 
2.9 This proposed project was not contained within the 2024/25 Local Delivery Plan that
was approved by the Scottish Government and Committee on 10th May 2024. The
Scottish Government have subsequently confirmed that the proposed use of grant is
compliant with the terms and conditions of the VDLF and approve this project. 
2.10 Following the Scottish Government Budget announcement in December 2024, it is
anticipated that £1.896M capital grant funding will be awarded to North Lanarkshire
Council subject to the submission and approval of a 2025/26 VDLF LDP. 
2.11    Two projects have been identified at Gartcosh and Ravenscraig by Fusion Assets to
receive VDLF grant funding. The projects involve site investigative works, potential site
acquisition and enabling works thereafter. It is proposed that the funding is allocated to
these projects with the breakdown finalised prior to submission of the LDP to Scottish
Government for final approval. The grant offers to Fusion will reflect the final grant offer
received from Scottish Government. 
Long-Term Plan for Towns Programme 
2.12  In late 2023, Coatbridge was awarded £19.51m in UK Government funding through its
Long-Term Plan for Towns programme. The council is the accountable body for this
funding and responsible for establishing and supporting a Coatbridge Town Board
which will oversee the development and delivery of the Long-Term Plan for Coatbridge.
2.13 It was initially expected that Long-Term Plans would have to be submitted for UK
Government approval by August 2024 however this submission date has been delayed
following the election of a new UK Government in July 2024, which advised it was
reviewing all previously made funding commitments. The funding stream (and
Coatbridge’s inclusion within the programme) was confirmed at the Budget in October
and UK Government has advised that updated guidance will be published in the New
Year and that project delivery will commence from 2026/27. 
2.14 Significant work has already been undertaken to establish the Town Board and engage
with the people and communities of Coatbridge to establish priorities and inform the
future Investment Plan.  Once the new guidance is issued the Draft Investment Plan
will be produced for final consultation prior to submission to the UK Government for
approval during 2025.  
2.15 A further update will be provided to committee when updated information is made
available and prior to submission of the Plan to the UK Government.  
Page 61 of 100

Page 62

Rediscovering Airdrie 
2.16  In 2023, the council secured £150,000 from Historic Environment Scotland and
National Lottery Heritage Fund to support the ‘development phase’ of ‘Rediscovering
Airdrie’, a heritage-led regeneration project aimed at supporting a range of physical
interventions and community heritage activities in Airdrie town centre. 
2.17 The project formally commenced in January 2024 with the development phase having
now concluded. Officers are currently preparing bids for full ‘delivery phase’ funding (of
£2.65m) towards the project, which will be supported by match funding from the council. 
2.18 Subject to funding bid approval, the project will establish a new creative sector hub
(including an Airdrie Museum, Box Office, gallery and studio space), administer grants
to property owners to improve shopfronts and for the repair and conservation of their
buildings, and support a wide range of community heritage activities including
programmes for local schools, youth arts, local artists and craftspeople and a ‘heritage
socials’ project aimed at engaging under-represented communities in heritage-themed
activities and events to improve their health and wellbeing. 
Summerlee Redevelopment 
2.19  ‘New Stories, New Audiences, Better Lives’, a project which aims to redevelop parts of
Summerlee Museum of Scottish Industrial Life and deliver a programme of activities
aimed at engaging new audiences and extending the museum’s collections, secured
£127,000 in ‘development phase’ funding from National Lottery Heritage Fund in 2023. 
2.20  The project formally started in February 2024. A full ‘delivery phase’ application,
seeking £3.4m in funding will be submitted by June 2025. 
Palacerigg Redevelopment 
2.21  A bid seeking £266,000 in ‘development phase’ funding for ‘New Roots, Old Roots’,
aproject aiming to redevelop Palacerigg Country Park has been submitted to National
Lottery Heritage Fund, with a funding decision expected in March 2025. 
2.22  The project, led on by the council’s Greenspace Projects Team, will improving trails
and natural heritage and reopening the Visitor Centre (for community management) If
successful, it is expected that a full ‘delivery phase’ application seeking £3.5m (towards
overall project costs of £5.3m) will be submitted in autumn 2025. 
North Lanarkshire Heritage Network 
2.23  The council was awarded £250,000 from National Lottery Heritage Fund to manage a
North Lanarkshire heritage network. This funding was to be used to employ a new
Heritage Outreach Officer who will be responsible for establishing and supporting the
network and working with individuals and groups to develop heritage projects and
secure external funding for these. This will include intensive engagement works across
each of North Lanarkshire’s nine Community Board areas on a rolling basis across a
three-year period. 
2.24 This post has now been filled with work currently underway to plan engagement activity. 
Regeneration Capital Grant Fund (RCGF) 
2.25  As previously advised to Committee, the Scottish Government had previously paused
assessment of Round 11 of RCGF due to financial constraints. It had also advised that
it may not be in a position to launch any further rounds of the Fund. The council had
submitted a bid for the development of a new community wellbeing hub at Cairnlea
Parish Church in Airdrie.
Page 62 of 100

Page 63

2.26 In December 2024, the council was advised that Scottish Government may now be in
a position to make funding awards for Round 11 bids and intends to re-assess these in
the new year. Officers are working with trustees at Cairnlea to confirm if the project
remains viable and an updated RCGF application was submitted to the Scottish
Government on Friday 31st January for consideration for a funding award.
Vacant and Derelict Land Investment Programme (VDLIP) 
2.27  As previously advised to Committee, the Scottish Government had previously paused
assessment of Round 3 of the VDLIP due to financial constraints. It had also advised
that it may not be in a position to launch any further rounds of the Fund. The council
had submitted bids for community-led greenspace projects on vacant and derelict land
in Cumbernauld Village and in Glenboig.
2.28 In December 2024, the council was advised that Scottish Government may now be in
a position to make funding awards for Round 3 bids and intends to re-assess these in
the new year. Officers are working with both respective partner organisations
(Cumbernauld Village Community Council and Glenboig Development Trust) and
submitted updated VDLIP applications to the Scottish Government on Friday 24th
January for consideration for a funding award.
Place Based Investment Programme (PBIP) 
2.29  The Scottish Government committed to the establishment of a Place Based Investment
Programme (PBIP) allocating £140M to local authorities over 5 years commencing in
2021/22.
2.30  This fund is used to take forward place-based initiatives focused on a range of key
themes including place making, town centre regeneration, 20 minute neighbourhood,
community led regeneration and ownership, tackling inequalities, accelerating goals for
net zero carbon, and promoting community wealth building. 
2.31  The fund was temporarily paused by the Scottish Government in early 2024. The
Council subsequently received funding of £830,000 towards the Strathclyde Park
project. This was a reduced allocation as an award of £1.698m had been expected.
2.32 The Scottish Government have confirmed that they expect the Place Based Investment
Programme to continue in 2025/26 in what would be the fifth and final year of its
operation. Presently, the Scottish Government are unable to confirm how much will be
available or if any of the terms and conditions of the grant will change. The Council had
expected to receive £1.698m in 2025/26.
Strathclyde Country Park 
2.33  The Scottish Government has also paused the Green Growth Accelerator funding
programme, through which the council expected to receive up to £10m towards the low
carbon redevelopment of Strathclyde Park. 
2.34  A bid for £2.345m from the Scottish Government’s Public Sector Heat Decarbonisation
Fund towards the low-carbon redevelopment of Strathclyde Country Park was
submitted in December 2023, with funding secured in March. This funding will
contribute towards the ‘fabric first’ elements of the retrofit of the Watersports Centre in
the Park. 
2.35 Unfortunately, however, due to its changing capital position Scottish Government
required that this funding was spent in this financial year. The council would however
only be able to spend a small proportion of this, and in so doing it would undermine any
future bids to the fund during 2025/26. The council has therefore not accepted this
funding and intends to resubmit for the full funding award in the next financial year,
Page 63 of 100

Page 64

should the Fund be relaunched as expected. 
2.36 The council has however secured and accepted £830,000 in funding from the Scottish
Government’s Place Based Investment Programme, which was made available in
Autumn 2024 following a ‘call for projects’ which were reliant on the previously paused
programme and which were at risk of failing in the event that funding was not awarded. 
2.37  While this project is supported through the council’s strategic capital programme,
additional funds will need to be secured to enable the project to proceed as originally
planned, and officers are liaising with potential funders such as Clyde Mission with a
view to securing the necessary additional funds. 
3. Measures of success 
3.1 The primary measure of success arising from the work and updates outlined in this
report is to maximise external funding for investment in the regeneration of North
Lanarkshire and its places. 
3.2 Future economic and employment benefit gained from the investment of the council’s
allocated VDLF grant awards made from the Scottish Government. 
4  Supporting Documents 
None 
Pamela Humpries
Chief Officer (Place) 
Page 64 of 100

Page 65

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 65 of 100

Page 66

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Risks are identified and managed within the relevant project risk registers. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 66 of 100

Page 67

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    SD/PH Date 14/02/25 
UK Shared Prosperity Fund 2025/26 
From  Pamela Humphries, Chief Officer (Place)  
E-mail Douglass@northlan.gov.uk Telephone Sharon Douglas
07970 489136 
Executive Summary 
As part of the UK Government’s Autumn Budget Statement presented to Parliament on
Thursday 30 October 2024, the Chancellor confirmed that UKSPF will continue for a Year 4
with a budget of £900m for the 12 month-period.  Further details on how UKSPF will be
implemented during 2025/26 and the allocations to lead authorities were confirmed by the UK
Government on 13th December 2024.The UKSPF allocation for North Lanarkshire for
2025/26 will be £6,034,163. 
The Council’s UKSPF Project Board met in November and December 2024 to consider
options for the transition year and this report presents proposals for the distribution of funding
for 2025/26. 
Recommendations
It is recommended that the Committee: 
(1)  Approve the proposals recommended by the UKSPF Board for delivery during
2025/26 as set out in section 2 and Appendix 1 of this report to enable Glasgow City
Region to submit the Year 4 Plan to the UK Government.  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (21) Continue to identify and access opportunities to leverage
additional resources to support our ambitions
Programme of Work All Programmes of Work
Item 6
Page 67 of 100

Page 68

1. Background 
1.1 The UK Government’s Shared Prosperity Fund (UKSPF) provided £2.6bn of capital
and revenue funding across the UK for local investment from April 2022 to March 2025.
As part of that funding, the 8 member authorities in the Glasgow City Region received
a combined allocation of £73.9m which was approximately 35% of the Scottish
allocation. North Lanarkshire received an allocation of £13,871,047. 
1.2 The primary goal of the UKSPF was to build pride in place and increase life chances
across the UK. Underneath this overarching aim, there were three UKSPF investment
priorities:
• Communities and place
• Supporting local business
• People and skills
In addition, Multiply was a specific budget within the UKSPF to support adult numeracy
skills. North Lanarkshire’s allocation included £11,475,646 as core UKSPF funding and
£2,395,402 to be ringfenced for delivery of activity under Multiply. 
1.3 At the last reporting point (December 2024), cumulative spend for UKSPF Programme
was £10,009,411, representing 73% of the programme allocation. The UK Government
has confirmed that there will be no opportunity for underspend as at the end of March
2025 to be carried forward. It is expected that full spend will be achieved. 
1.4 As part of the UK Government’s Autumn Budget Statement presented to Parliament on
Thursday 30 October 2024, the Chancellor confirmed that UKSPF will continue for a
Year 4 with a budget of £900m for the 12 month-period. This is a reduction of 40% on
the UKSPF year 3 (2024/25) allocation of £1.5bn. The intention is that this ‘transition’
year allows the continuation of activities while a new programme approach is developed
for April 2026 onwards. More information on the new approach is expected in the UK
Government’s Spring Statement.
1.5 Further details on how the UKSPF transition year will be implemented and the
allocations to lead authorities were confirmed by the UK Government on 13th December
2024.  The key points relating to the allocation methodology were:
• the overall 40% reduction in UKSPF has not been applied evenly across all areas.
Areas with a higher level of deprivation will receive a 20% reduction with other
areas receiving a 45% reduction;
• there is a minimum requirement for capital spend of around 26% of the UKSPF
allocation to each area; and,
• there will be no ringfenced funding for Multiply, although these activities can be
continued under the People and Skills theme. 
1.6 As a result of deprivation levels being taken into account in the allocation methodology,
Glasgow City Region, and within that North Lanarkshire Council, will receive more
UKSPF than would have been the case if the 40% reduction had been implemented
across the board. North Lanarkshire is one of 6 areas in Scotland to receive the lower
reduction. The UKSPF allocation for North Lanarkshire for 2025/26 is £6,034,163. 
Page 68 of 100

Page 69

1.7 Along with confirmation of UKSPF allocations to lead authorities, the UK Government
issued a technical note on managing the fund in 2025/26. While broadly continuing the
current management and reporting arrangements, the technical note sets the UKSPF
out in terms of its contribution to the UK Government’s 5 national missions with a
special focus on the mission to kickstart economic growth. 
1.8 The Council’s UKSPF Project Board met in November and December 2024 to consider
options for the transition year and this report presents proposals for the distribution of
funding for 2025/26.  
2. Report 
2.1 The aim of year 4 is to provide a smooth transition from the existing UKSPF programme
to a new, future funding framework. The UK Government is also committed to restoring
decision making on structural funding to representatives of Scotland, Wales and
Northern Ireland and will work closely with the devolved governments to honour this
commitment. 
2.2 The UK Government has set out an ambitious plan for change, focused on 5 national
Missions. The UKSPF in 2025/26 is intended to proactively support Mission-delivery,
pushing power out to communities everywhere, with a specific focus to help kickstart
economic growth and promote opportunities in all parts of the UK. The UKSPF’s current
53 interventions have been mapped to 12 new sub-themes, meaning that UKSPF can
still support the wide range of activity delivered since it started in 2022. The priorities,
themes and sub-themes are shown in Appendix 2. 
2.3 The role of lead authorities in the delivery of the UKSPF for 2025/26 remains the same.
Lead local authorities will receive an area’s allocation to manage, including the
assessment and approval of projects, processing of payments and day to day
monitoring of activities. They also retain the ability to use up to 4% of their allocation to
undertake necessary UKSPF administration and reporting. 
North Lanarkshire Proposals 
2.4 The oversee the implementation of the UKSPF programme for the initial programme
running from April 2022 to March 2025, a UKSPF Board was established, chaired by
the Chief Officer (Place) as the Senior Responsible Officer. The Board has met at least
quarterly since February 2023 and has monitored progress of the UKSPF programme
including approval of project proposals/changes, submission of quarterly reports and
monitoring of risks. Latterly it has also considered the UK Government’s allocation for
a fourth year of funding – 2025/26 – and has developed proposals to ensure continued
delivery and preparation for a transition towards a new future funding framework. 
2.5 Prior to considering proposals from current projects the Board established 3 key
principles: 
• the starting point for proposals being developed would be a reduction of 40% in
funding - in line with the overall UKSPF budget. Thereafter performance and
the impact of stopping delivery and potentially restarting in 2026 would be taken
into account;
Page 69 of 100

Page 70

• adult numeracy activities should be continued under the people and skills
investment there, albeit that a reduction in the level of provision would be
necessary; and,
• capital proposals should be tied into the capital plan already approved as these
projects had already gone through an assessment and prioritisation process 
2.6 Based on the principles above, the Board agree that proposals for 2025/26 should be
based initially on a reduction of approximately 40% for activities under the Communities
and Place and Business Support interventions. Furthermore, as employability, skills
and multiply provision are primarily staff based that the remaining funds be allocated to
increase the budget provision for the People and Skills theme, including activities
previously funded through Multiply.  This results in the following recommended
distribution of funds across the 3 priorities set out by the UK Government: 
Priority 2024/25 (year 3)
allocation
Year 4 proposed
distribution 
Capital (C&P) 1,406,500 1,405,960 23.3% of total –
this is minimum
requirement
Communities and
Place
858,500 485,000 58% of year 3
allocation
Local Business
Support
1,667,738 1,015,000 61% of year 3
allocation
People and Skills 3,072,976 2,886,837 75% of year 3
allocation Multiply 802,181
Management and
Administration
325,329 241,366  4% of total
allocation
TOTAL 8,133,224 6,034,163 
2.7 A full list of projects under each of the priority themes, and sub themes, is provided in
appendix 1 of this report. 
3. Measures of success 
3.1  Success of the UKSPF is monitored and reported through a set of outputs and
outcomes. These were agreed with the UK Government as part of the original UKSPF
investment plan submitted in August 2022 and approved in December 2022. Monitoring
reports are required to be submitted to the UK Government every 6 months. 
3.2 The North Lanarkshire UKSPF Investment Plan included 92 outputs and outcomes
across the 3 investment themes and the Multiply interventions. While not all of these
have remained relevant to the implementation of the programme, output and outcome
achievements continue to be collected and reported. A report on achievements will be
provided to the UK Government on completion of the original 3 year programme at the
end of March 2025. This report will also present the proposals for use of the funds in
2025/26. 
3.3 The UK Government has indicated that it is continuing to simplify UKSPF where
possible, including reducing the list of outputs and outcomes for 2025-26 and
simplifying reporting requirements. An updated list of outputs and outcomes for 2025-
Page 70 of 100

Page 71

26 will be published in due course and outputs/outcomes for the proposed activities in
North Lanarkshire will be updated accordingly. 
4. Supporting documentation 
4.1  Appendix 1     List of UKSPF proposed projects
4.2 Appendix 2     UKSPF Investment priorities and the Government’s Missions
4.3  Further information on the UKPSF can be found at the UK Government website - UK
Shared Prosperity Fund - GOV.UK 
Pamela Humphries
Chief Office (Place) 
Page 71 of 100

Page 72

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
An EQIA was carried out and published for the North Lanarkshire UKSPF Investment
Plan in 2023 – this additional year of funding will be delivered in line with the original
EQIA - UK Shared Prosperity Fund Investment Plan: North Lanarkshire | North
Lanarkshire Council 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
This report presents proposals for the distribution of additional funding from the UK
Government to support a transition year for the UK Shared Prosperity Fund. The
Chief Officer (Financial Solutions) is a member of the UKSPF Board and has been
involved in developing the proposals presented. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
A number of the projects to be funded will offer contract extensions to staff on
temporary contracts due to the time limited nature of the funding programme. Project
lead officers will discuss the implications of any reduction in funding with the relevant
People Resources contacts. The Chief Officer (People and Organisational
Development) is a member of the UKSPF Board and has been involved in developing
the proposals presented. 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒
Page 72 of 100

Page 73

If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Funding from the UK Shared Prosperity Fund requires to be acknowledged in any
communications or publicity. Corporate Communications are aware of this
requirement and provide advice and guidance to project lead officers. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Page 73 of 100

Page 74

There is a risk that the funding will not be adequately managed and reporting
requirements will not be met resulting in a need to repay funds. A full programme
risk register is in place and will be updated accordingly. This is overseen by the
UKSPF Board. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
Some project activities will impact on vulnerable young people and will assist them
to reach higher levels of attainment and vocational training. 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒ 
Page 74 of 100

Page 75

Appendix 1 
SHARED PROSERITY FUND ALLOCATIONS 2025/26 
Capital Projects (funding distribution to be finalised)
Watersports Centre, Strathclyde Country Park 1,405,960 The Time Capsule
Communities and Place
Thriving Places – development of visitor economy
Visitor Campaigns – Visit Lanarkshire 40,000
Healthy, Safe and Inclusive Communities – improve health and wellbeing
Impactful Volunteering – Volunteer NL 85,000
Healthy, Safe and Inclusive Communities – brining communities together
Investment in Capacity Building – Community Empowerment NL 360,000    
Local Business Support
Advice and Support to Businesses
SME Development Grants and Support - Business Grants 650,000
SME Development Grants and Support - Smart Hub Lanarkshire 50,000
Expert Help 175,000
Enterprise Culture and Start up Support
Strengthening Entrepreneurial support – BAME and Female
Entrepreneurs
100,000
Social Enterprise Support 40,000    
People and Skills
Supporting people to progress towards and into employment
North Lanarkshire’s Working 1,568,837
Support for young people who are or at risk of being NEET
Vocational training support for vulnerable leaving school 250,000
Employment Related Skills
NL Built Environment Academy 230,000
Essential Skills (including numeracy, literacy, ESOL and digital)
NL Digital Skills Academy 224,000
Multiply - Sum it Up 496,000
Multiply - Managing Your Money 118,000  
Management and Administration (4%) 241,367   
Page 75 of 100

Page 76

Appendix 2    
UKSPF Investment priorities and the Government’s Missions
Communities and Place Supporting Local Business People and Skills
Healthy, Safe and
Inclusive
Communities
Thriving Places Support for Business Employability Skills
Sub-themes
• Healthy:
improve
health and
wellbeing
• Safe: reduce
crime and the
fear of crime
• Inclusive:
bringing
communities
together;
tackling
homelessness
Sub-themes
• Development
of the visitor
economy
• High street
and town
centre
improvements
Sub-themes
• Advice and support to businesses
• Enterprise culture and start up
support
• Business sites and premises
Sub-themes
• Supporting
people to
progress
towards and
into
employment
• Support for
young people
who are at
risk of being
NEET
Sub-themes
• Essential
skills
(including
numeracy,
literacy,
ESOL and
digital)
• Employment
related skills
Contributing to
UKG Missions:
• Make Britain a
clean energy
superpower
• Take back our
streets
• Bring down
barriers to
opportunity
• Build an NHS
for the Future
Contributing to
UKG Missions:
• Kickstart
Economic
Growth
Contributing to UKG Missions:
• Kickstart Economic Growth
• Make Britain a clean energy
superpower
• Bring down barriers to opportunity
Contributing to
UKG Missions:
• Kickstart
Economic
Growth
• Make Britain
a clean
energy
superpower
• Bring down
barriers to
opportunity
Contributing to
UKG Missions:
• Kickstart
Economic
Growth
• Make Britain
a clean
energy
superpower
• Bring down
barriers to
opportunity 
Page 76 of 100

Page 77

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☒ Yes ☐ No
Ref: NLC-CPT-24-057 Date: 14 February 2025 
Contract Award for Business Support and Expert Help Services 2025-
2029 
From  Pamela Humphries, Chief Officer (Place) 
E-mail weiry@northlan.gov.uk Telephone: Yvonne Weir
07508 001238 
Executive Summary 
The Committee is asked to approve the award of a Multi Lot/Multi Supplier Framework Agreement
for Business Support and Expert Help Services 2025-2029 (the ‘Agreement’) to the Tenderers listed
within Appendix 1. 
The Agreement is a collaboration between North Lanarkshire Council (the “Council”) and South
Lanarkshire Council (“SLC”) with the Council acting as the lead authority. 
The Agreement is for an initial period of 12 months anticipated to commence on 01 April 2025. The
Council reserves the right to extend the Agreement for additional periods up to a maximum of a
further 36 months (3 x 12 month periods). 
The value of the Agreement shall not exceed One Million, Four Hundred Thousand Pounds Sterling
(£1,400,000.00) exclusive of VAT. 
Recommendations
It is recommended that the Committee:
(1) Approves the award of the Agreement to Tenderers listed within Appendix 1, at the maximum
value of One Million, Four Hundred Thousand Pounds Sterling (£1,400,000.00) exclusive of
VAT. 
The Plan for North Lanarkshire 
Priority Improve economic opportunities and outcomes 
Ambition Statement (5) Grow and improve the sustainability and diversity of North
Lanarkshire's economy 
Programme of Work Invest in North Lanarkshire 
Item 7
Page 77 of 100

Page 78

1. Background 
1.1  The requirements within the Agreement are currently under contract with 27 Contractors via
a 9 Lot Agreement . This arrangement is due to expire on 31 March 2025 with the Agreement
detailed within this report due to supersede it. 
1.2  The Council in partnership with (SLC) are seeking to appoint a range of skilled business
Contractors across a variety of disciplines to deliver business support and expert help
services for Lanarkshire based Small to Medium Sized Enterprises (SMEs). 
1.3 Both Councils have secured a further 12-month’s funding to 31 March 2026 from the UK
Shared Prosperity Fund (UKSPF) to provide Business Support and Expert Help Services that
supplement and provide additional support to the existing services available through
Business Gateway services in Lanarkshire. 
1.4 Services required include business support and expert help to businesses within Lanarkshire
covering themes such as: 
• Financial Management;
• Business Growth and Development;
• Human Resources, Leadership and Skills;
• Procurement;
• Marketing;
• Information Technology and Digital;
• Energy Efficiencies and Net Zero; and
• New Market Opportunities and Internationalisation 
1.5 The main purpose of the Agreement is to support Lanarkshire businesses to grow; thus
providing employment opportunities, growth in key sectors and inclusive growth. This will be
achieved by providing support to businesses on specific topics which will help their
understanding, skills and capabilities; highlight potential areas for improvement; signposting
service users to further support that helps and agree an action plan with some identified next
steps to implement to help the business meet their objectives. 
1.6 The agreement for Business Support and Expert Help Services 2025–2029 shall allow
Lanarkshire based SMEs to receive: 
• between one (1) and five (5) days “Expert Help Support”;
• access to various “Training and Support Workshops”; and / or
• access to “Specialist Support Surgeries”. 
1.7 The main aim of the Agreement is to ensure that suitably qualified consultants are available
to provide Lanarkshire based SMEs with bespoke advice and support, focusing on
sustainability and growth areas such as: 
• reviewing existing processes, strategies, policies or plans; 
• supporting businesses to improve these accordingly or to introduce new processes,
strategies, policies or plans as required;
• introduce new products or services; and
• reach new markets 
Page 78 of 100

Page 79

1.8 To enable appropriate delivery of services, the opportunity was presented as a framework
agreement consisting of 8 separate Lots. 
1.9 The Agreement although procured and owned by the Council will be available for use by
SLC. The Agreement has its own operating and management conditions applied within
however the responsibility for making services available to service users, raising call-off
contract/purchase orders, payment of invoices etc. shall be the sole responsibility of each
Council. 
1.10 The aim was to appoint a maximum of 4 Tenderers to each Lot of the Agreement.  
Appointment to the Agreement would be achieved by way of the relevant highest scoring
(most economically advantageous tenders) Tenderers within the procurement process for
each Lot.   
1.11 All Lots within the Agreement will operate on an unranked basis. Once a Contractor has been
identified to deliver the Council’s requirements, a “Call-Off Contract” will be raised by way of
a Direct Award only. For each Lot, the Council’s decision on who to award services to is final. 
2. Report 
2.1 A group of technical and procurement representatives was formed to develop and agree the
procurement strategy for the Agreement to enable the Council to achieve maximum benefit
for the requirements. 
2.2 The initial estimated value of the Agreement dictated that the procurement procedure be
undertaken in accordance with the Public Contracts (Scotland) Regulations 2015.  An advert
for the procurement opportunity was published on the Public Contracts Scotland and the UK
Find a Tender (FTS) website. 
2.3 The procurement procedure was undertaken as an “Open Procedure” and a “Supplier
Engagement Event” was held to provide an overview of the requirement with 78 Contractors
attending the event. 
2.4 Across the 8 Lots, there were 59 Tenderers who submitted bids. This amounted to 74
individual proposals and each bid was evaluated in accordance the evaluation criteria and
scoring methodology set out in the invitation to tender package within the procurement
procedure, an evaluation of tender responses received was completed by members identified
by the User Intelligence Group (UIG).  Selection stage responses were assessed first and
compliant Tenderers that satisfied/declared that they met the published minimum selection
stage criteria progressed to the award stage evaluation. Following identification of the
recommended Tenderer(s), their selection stage responses were assessed in more detail to
ensure they satisfied the minimum selection stage criteria applied. 
2.5 The Agreement award recommendation is made on the basis of the Tenderers who submitted
the most economically advantageous tender for each Lot consequently demonstrating Best
Value. 
2.6 The tenders as detailed within Appendix 1 have been evaluated as representing the most
economically advantageous tender for each Lot of the Agreement. 
Page 79 of 100

Page 80

2.7 Appendix 2 confirms the scoring achieved by each Tenderer for each Lot, further details of
the procurement procedure is provided in Appendix 3 and the SME status and location of all
Tenderers is located within Appendix 4. 
2.8 The total value of the Agreement shall not exceed One Million, Four Hundred Thousand
Pounds Sterling (£1,400,000.00) exclusive of VAT. The Agreement is further broken down
on a Lot by Lot basis as detailed below: 
Lot Lot Title Maximum Lot
Value
1 Financial Management £160,000
2 Business Growth and Development £250,000
3 Human Resources, Leadership and Skills   £80,000
4 Procurement £250,000
5 Marketing £280,000
6 Information Technology and Digital £280,000
7 Energy Efficiency and Net Zero   £50,000
8 New Market Opportunities and Internationalisation   £50,000 
Financial / Budget Consideration 
2.9 The maximum value of the Agreement is £1,400,000.00 exclusive of VAT.   
2.10 The costs associated with delivery of the Agreement will be contained within the Revenue
budget for Enterprise Team, Place as supplemented by funding from the UK Shared
Prosperity Fund for 2024/2025.  This will be reviewed on an annual basis subject to funding
being available.  SLC have their own budgetary procedures in place to account for services
they procure via the Agreement. 
Price Stability 
2.11 Prices within the Agreement shall remain firm and unchangeable for the first 2 x 12 months
periods (24 months in total) thereafter may be subject to price review as per the Agreement
Terms & Conditions. 
Page 80 of 100

Page 81

Community Benefits 
2.12 The Council is committed to maximising the delivery of community benefits. The procurement
included a community benefit requirement, this approach is designed to deliver local
community benefits where possible. 
2.13 All Tenderers confirmed their commitment to delivering community benefits should they be
successful in being awarded a Call Off Contract as a result of the Agreement. 
2.14 Accordingly, there is no community benefits as part of the appointment to the Agreement.
However, as call off contracts are achieved, community benefits will be delivered. 
2.15 The following community benefits were committed to by those identified for appointment
within the Agreement: 
Community Benefit Type Quantity
Committed
Business Event / Briefing to promote supply chain opportunities 9
Business Mentoring and Advice to support to an SME / Social Enterprise /
Voluntary organisation 50
Educational Sponsorship 2
Educational Support and Skills Transfer 2
Educational Visits 18
Educational Workplace Visit 5
Financial Support for a Community Project / Organisation 9
Non-financial Support for a Community Project / Organisation 19
Work Experience Placement for an individual aged 14 to 16 years of age 5
Work Experience Placement for an individual 16+ years of age 6  
2.16 The community benefits delivered as part of the Agreement does not include the creation of
jobs or apprenticeships. 
Fair Work First  
2.17 As part of the tender exercise Contractors (including sub-contractors, supply chain partners
etc) were encouraged to ensure compliance with the Scottish Governments “Fair Work First”
initiative should they be successful in being awarded a Call Off Contract as a result of the
Agreement. 
Contract Management 
2.18 Officers from the Enterprise Team, Place will be responsible for managing the Agreement
which will be undertaken in accordance with the contract and supplier management
conditions applied within the Agreement. 
Page 81 of 100

Page 82

3. Measures of success 
The Agreement will deliver the following outcomes; 
3.1 Best Value has been considered to be demonstrated by:
• procuring via the open market with a streamlined approach making it easier for SME’s
and sole traders to bid therefore encouraging competition; 
• enabling a platform for a continuous, consistent and further established approach to the
delivery of Business Support and Expert Help Services; 
• enabling a broad skillset of experts to be engaged in specialist areas to complement
existing business support services; 
• creating the opportunity to develop a relationship with multiple Contractors (as opposed
to a single organisations) which should benefit the Agreements operation and spread the
work over many organisations; and 
• enabling the delivery of additional benefits to the Lanarkshire community. 
3.2 The appointment of Contractors who have the experience and capability to deliver an
innovative, high quality and responsive Business Support and Expert Help service that will
deliver the minimum service delivery targets; 
3.3 The procurement procedure was compliant with the procurement legislation and internal
procedures; 
3.4 The Agreement secured a range of community benefits; 
3.5 The Agreement performance is proactively managed against a number of local Key
Performance Indicators and national targets; and 
3.6 A collaborative approach to the procurement of the requirement, minimising the burden on
internal resource and leveraging the economies of scale. 
4. Supporting documents 
4.1 Appendix 1       Summary of Tenderers Identified for Appointment to the Framework                                     
Agreement
4.2 Appendix 2       Summary of Tender Evaluation Process
4.3 Appendix 3       Summary of Procurement Process
4.4 Appendix 4       SME Status and Location of All Tenderers 
Pamela Humphries
Chief Officer (Place)  
Page 82 of 100

Page 83

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data? 
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-mailed
to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The services procured include Information Technology, Digital and Digital marketing
support for businesses.
Page 83 of 100

Page 84

Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The services procured include Environmental Efficiency and Net Zero support for
businesses to improve their performance and capabilities in these areas. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The services will be marketed through the council’s social media and other channels, and
on the council’s website.
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts, highlighting
where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk
Registers), and how they are managed? 
A project specific risk register will be put in place.
Key risks include:
• Lack of demand for services – the values of each Lot have been based on
previous demand. Marketing of the services will take place and robust contract
monitoring will be in place.
• Lack of future funding – the Framework has been designed to accommodate this.
• Poor service delivery by Experts – robust contract management and feedback
from clients will be in place to address any service delivery concerns.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does
it relate to healthcare, housing, or education services for in-Service or ex-Service
personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to ensure
there has been appropriate consideration of the particular needs of the Armed Forces
community to make sure that they do not face disadvantage compared to other citizens in
the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service delivery,
policy, or plan that has an impact on children and young people up to the age of 18, or on
a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles from the
United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been carried
out? 
Yes ☐ No ☐ Page 84 of 100

Page 85

Summary of Tenderers Identified for Appointment to the Framework Agreement                             Appendix 1
Tenderer Name Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 Lot 7 Lot 8 Total
Lots
Accountants Plus (Hamilton) Limited t/a Accountants Plus 4th         1
Arthian Ltd       2nd  1
Callann Bid Services Ltd    3rd     1
CJM Project Financial Management Limited 3rd         1
Concept HR Solutions   1st      1
Connect Three Solution Limited   2nd      1
Coull Coaching Ltd  4th 4th       2
FP Business Services Limited 2nd         1
GAP Communications  1st   1st    2
Inspirent Ltd  2nd   4th    2
Intelligens Consulting Ltd      1st    1
Intend Business Development Limited    1st      1
J&G3 Ltd     3rd    1
Keep Scotland Beautiful       4th   1
KL Business Consulting Limited 1st         1
Managed IT Experts Ltd      2nd    1
MJM Associates (Scotland) Ltd        2nd 1
Morrow Associates Ltd    2nd     1
NSDesign Ltd      4th   1
Secure Business Advisors Limited  3rd       1
Stirling Enterprise Park Ltd   3rd   3rd   2
Stirton Consulting Ltd       3rd   1
Synergie Environ Ltd       1st  1
Taylor Comms Limited T/A Taylor Communications     2nd    1
TheMacDogFactory Limited trading as BrexEasy        1st 1
Tinto Procurement    4th     1
Page 85 of 100

Page 86

Summary of Tender Evaluation Process                   Appendix 2
Lot 1 –  Financial Management
Final
Rank Tenderer Name Total Tender
Score (%)
Recommended
for Award
1 KL Business Consulting Limited 84.40% Yes
2 FP Business Services Limited 82.26%  Yes
3 CJM Project Financial Management Limited 79.06% Yes
4 Accountants Plus (Hamilton) Limited 
t/a Accountants Plus 76.29%  Yes
5 Firstimpact Business Ltd 73.21% No 
Lot 2 –  Business Growth and Development
Final
Rank Tenderer Name Total Tender
Score (%)
Recommended
for Award
1 GAP Communications 91.40% Yes
2 Inspirent Ltd 84.94% Yes
3 Secure Business Advisors Limited   84.90% Yes
4 Coull Coaching Ltd 77.65% Yes
5 Firefly Innovation Ltd 76.32% No
6 Connect Three Solution Limited 72.39% No
7 The Power Within Training and Development  70.75% No
8 Genoa Black Ventures LLP 70.01% No
9 Firstimpact Business Ltd 67.93% No
10 Academy of Enterprise Education (AEE) 66.74% No
11 Momentic Limited 66.47% No
12 Defankle Innovation Limited 64.84% No
13 Perception Insights Ltd 63.01% No
14 Basics and Beyond Ltd 62.86% No
15 Where Now Consulting Ltd 62.67% No
Page 86 of 100

Page 87

16 Real Retail Solutions 60.63% No
17 Studio Zao Innovations Ltd 58.41% No
18 Geisel Consulting Limited 49.23% No 
Lot 3 –  Human Resources, Leadership and Skills
Final
Rank Tenderer Name Total Tender
Score (%)
Recommended
for Award
1 Concept HR Solutions 88.40% Yes
2 Connect Three Solution Limited 88.32% Yes
3 Stirling Enterprise Park Ltd 81.40% Yes
4 Coull Coaching Ltd 80.96% Yes
5 Arena HR Ltd 76.90% No
6 Katie Bell HR Ltd 70.29% No
7 Orbit Agency Limited 62.46% No
8 Albany HR Ltd 58.61% No
9 Perception Insights Ltd 57.98% No
N/A Flexibility Works
Failed to
meet
technical
requirements
No 
Lot 4 - Procurement
Final
Rank Tenderer Name Total Tender
Score (%)
Recommended
for Award
1 Intend Business Development Limited 77.61% Yes
2 Morrow Associates Ltd 76.50% Yes
3 Callann Bid Services Ltd 74.12% Yes
4 Tinto Procurement 73.49% Yes
5 Bluestack Loudon Services Limited 69.80% No
6 Caughey Solutions Ltd 69.31% No
7 Geisel Consulting Limited 44.81% No
Page 87 of 100

Page 88

Lot 5 - Marketing
Final
Rank Tenderer Name Total Tender
Score (%)
Recommended
for Award
1 GAP Communications 91.40% Yes
2 Taylor Comms Limited T/A Taylor Communications 85.58% Yes
3 J&G3 Ltd 84.31% Yes
4 Inspirent Ltd  78.49% Yes
5 NSDesign Ltd 77.95% No
6 Breeze Connection Limited 71.99% No
7 Janine Marriott Ltd 71.06% No
8 Electrify Marketing & Communications 70.62% No
9 Genoa Black Ventures LLP 70.03% No
10 Quantum Marketing Solutions (Scotland) Ltd 68.71% No
11 Academy of Enterprise Education (AEE) 67.09% No
12 Momentic Limited 66.82% No
13 Basics and Beyond Ltd  63.28% No
14 Strategic Digital Marketing Group Ltd 60.30% No
15 Orbit Agency Limited 60.29% No
16 Solutions on Demand Ltd 58.97% No
17 New College Lanarkshire 51.43% No
18 Digital Landscope Limited 46.94% No
19 Sigma Communications & Marketing Limited 42.81% No 
Page 88 of 100

Page 89

Lot 6 - Information Technology and Digital
Final
Rank Tenderer Name Total Tender
Score (%)
Recommended
for Award
1 Intelligens Consulting Ltd 87.33% Yes
2 Managed IT Experts Ltd 86.34% Yes
3 Stirling Enterprise Park Ltd 79.12% Yes
4 NSDesign Ltd 78.23% Yes
5 R Cubed Technology Ltd 68.72% No
6 Solutions on Demand Ltd 65.86% No
7 Digitals OYT Ltd 62.84% No 
Lot 7 - Energy Efficiency and Net Zero
Final
Rank Tenderer Name Total Tender
Score (%)
Recommended
for Award
1 Synergie Environ Ltd 83.80% Yes
2 Arthian Ltd 68.27% Yes
3 Stirton Consulting Ltd 68.04% Yes
4 Keep Scotland Beautiful 56.76% Yes
5 Climate Essentials Limited 49.30% No
N/A Calash Ltd
Failed to
meet
technical
requirements
No 
Lot 8 - New Market Opportunities and Internationalisation
Final
Rank Tenderer Name Total Tender
Score (%)
Recommended
for Award
1 TheMacDogFactory Limited trading as BrexEasy 87.20% Yes
2 MJM Associates (Scotland) Ltd 82.35% Yes  
Page 89 of 100

Page 90

Summary of Procurement Process                          Appendix 3 
Response
CPT Contract Reference Allocated: NLC-CPT-24-057
Procurement Procedure Utilised: Open Procedure
Governing Legislation / Regulations: Public Contracts (Scotland) Regulations 2015
Date Contract Strategy Approved: 26 September 2024
Tender Platform Utilised: PCS-Tender (PCST)
Date Contract Notice Published: 04 October 2025
Total Expressions of Interest Received: 127
Tender Return Deadline: 05 November 2024
Number of Tenders Received: 74 Tenders (59 Tenderers) 
Tenderers who are SME’s: 58
Tenderers based in NLC:  8
Tenderers from Supported Businesses: 0
Number of Non−compliant Tenders: 0
Number of Compliant Tenders: 74
Number of Recommended Tenderers:
Lot 1 - 4
Lot 2 - 4
Lot 3 - 4
Lot 4 - 4
Lot 5 - 4
Lot 6 - 4
Lot 7 - 4
Lot 8 - 2
Basis of Award:
Most economically advantageous tender (per Lot)
Quality: 60% Price: 40%
Evaluation Team:
Officers from the Enterprise Team (Place), Economic
Development (SLC) and Corporate Procurement
Team
Anticipated Start Date of the Agreement: 01 April 2025
Total Agreement Period (Months): 48 months (initial 12 months with 3 x 12 month
optional extension periods )
Awarded Value of the Agreement: £1,400,000.00 
Page 90 of 100

Page 91

SME Status and location of all Tenderers                         Appendix 4 
Name of Tenderer
Size of
Tendering
Organisation
(Micro,
Small,
Medium or
Large)
Location
(Local Authority /
Council Area)
1. Academy of Enterprise Education (AEE) Micro South Lanarkshire
2. Accountants Plus (Hamilton) Limited Small South Lanarkshire
3. Albany HR Ltd Micro Edinburgh
4. Arena HR Ltd Micro Kilmarnock
5. Arthian Ltd Medium Glasgow
6. Basics and Beyond Ltd Micro East Renfrewshire
7. Bluestack Loudon Services Limited Micro North Lanarkshire
8. Breeze Connection Limited Micro Renfrewshire
9. Calash Ltd Small Aberdeen
10. Callann Bid Services Ltd Micro North Lanarkshire
11. Caughey Solutions Ltd Micro East Lothian
12. CJM Project & Financial Management Micro Prestwick
13. Climate Essentials Limited Small South Hampton
14. Concept HR Solutions Micro New Cumnock
15. Connect Three Solution Limited Small Glasgow
16. Coull Coaching Ltd Micro South Lanarkshire
17. Defankle Innovation Limited Micro Glasgow
18. Digital Landscope Limited Micro Renfrewshire
19. Digitals OYT Ltd Small London
20. Electrify Marketing & Communications Micro West Lothian
Page 91 of 100

Page 92

21. Firefly Innovation Ltd Micro North Lanarkshire
22. Firstimpact Business Ltd Micro Edinburgh
23. Flexibility Works Micro Glasgow
24. FP Business Services Limited Micro North Lanarkshire
25. GAP Communications Micro East Ayrshire
26. Geisel Consulting Limited Micro East Ayrshire
27. Genoa Black Ventures LLP Small Edinburgh
28. Inspirent Ltd Small North Lanarkshire
29. Intelligens Consulting Ltd Micro Glasgow
30. Intend Business Development Limited Micro Stirling
31. J&G3 Ltd Micro Glasgow
32. Janine Marriott Ltd Micro Renfrewshire
33. Katie Bell HR Ltd Micro Glasgow
34. KL Business Consulting Limited Micro Glasgow
35. Keep Scotland Beautiful Small Stirling
36. Managed IT Experts Ltd Micro Fife
37. MJM Associates (Scotland) Ltd Micro Clackmannanshire
38. Momentic Limited Small Derby
39. Morrow Associates Ltd Micro Glasgow
40. New College Lanarkshire Large North Lanarkshire
41. NSDesign Ltd Small Glasgow
42. Orbit Agency Limited Micro Isle of Lewis
43. Perception Insights Ltd Micro Stirling
44. Quantum Marketing Solutions (Scotland) Ltd Micro North Lanarkshire
Page 92 of 100

Page 93

45. R Cubed Technology Ltd Small Edinburgh
46. Real Retail Solutions Micro Glasgow
47. Secure Business Advisors Limited Micro East Dunbartonshire
48. Sigma Communications & Marketing Limited Micro Perth & Kinross
49. Solutions on Demand Ltd Small Ayrshire
50. Stirling Enterprise Park Ltd Small Stirling
51. Stirton Consulting Ltd Micro East Lothian
52. Strategic Digital Marketing Group Ltd Micro Edinburgh
53. Studio Zao Innovations Ltd Micro London
54. Synergie Environ Ltd Small Glasgow
55. Taylor Comms Limited T/A Taylor Communications Micro East Renfrewshire
56. The Power Within Training and Development  Small North Lanarkshire
57. TheMacDogFactory Limited trading as BrexEasy Micro Stirling
58. Tinto Procurement Micro South Lanarkshire
59. Where Now Consulting Ltd Micro Inverclyde 
Page 93 of 100

Page 94

Page 94 of 100

Page 95

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    JMcK/CPT Date 14/02/25 
Contracts awarded below Committee approval threshold 
From  James McKinstry - Chief Officer (Assets and Procurement)  
E-mail McKinstryJ@northlan.gov.uk  Telephone 07939 281102 
Executive Summary
In accordance with the Council’s General Contract Standing Orders (“GCSOs”), GCSO
21.10 requires a summary report be presented to members with details of contracts
awarded since last committee, specifically for the spend range: 
• over £50,000 but below £500,000 for supplies or services; and,
• over £500,000 but below £2,000,000 for works. 
Recommendations
It is recommended that the Enterprise and Fair Work Committee: 
(1) Acknowledge the contract awards made since last committee reporting cycle.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Item 8
Page 95 of 100

Page 96

1. Background 
1.1 The Local Government (Scotland) Act 1973 section 81 requires local authorities to
“…make standing orders with respect to the making by them or on their behalf of
contracts for the supply of goods or materials or for the execution of works.”. 
1.2 The Council’s General Contract Standing Orders (“GCSOs”) set out the council’s
specific procurement procedures and responsibilities at all spend levels, and include
the reporting requirements of procurement activity, including contracts awards, to
committee for either approval or acknowledgement. 
2. Report 
2.1 In accordance with GCSO 21.10, this report summarises the contract awards since last
committee, specifically for the spend range: 
• over £50,000 but below £500,000 for supplies or services; and,
• over £500,000 but below £2,000,000 for works. 
2.2 If you require further information regards the contract awards reported, please refer to
the lead service area / Chief Officer detailed in the appendix. 
3. Measures of success 
3.1 All requirements contracted contribute to either the council’s programme of work and/or
fulfil a statutory requirement. 
3.2 All contract awards secure best value for the council in accordance with their evaluation
criteria. 
3.3 All necessary diligence has been undertaken in the evaluation and appointment of
contractors. 
3.4 All contract awards are logged in the council’s contract register. 
4. Supporting documentation 
4.1 Appendix 1  Summary of contracts awarded. 
James McKinstry
Chief Officer (Assets and Procurement) 
5. Impacts 
5.1 Impacts considered as part of the contract award procedures are recorded in the
individual contract award reports held by the lead service area.  
Page 96 of 100

Page 97

Appendix 1 – Summary of Contracts Awarded 
Contract Ref NLC-SLP-24-072
Title The Centre Cumbernauld - MAST Development Proposals
Classification Services
Lead Service Area / Chief Officer Pamela Humphries, Chief Officer (Place)      
Competition Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on 3rd party frameworks
Procurement Route Call-off following Direct Award using Third Party Framework
No. of Framework Contractors 18
Award Criteria Best Value assessment, in accordance with the Framework Information
Comments This has been procured via Direct Award approach, considering the relevant information on
Framework Contractors technical and commercial proposals available through the Scotland Excel
Framework Agreement for Building Construction Consultancy (0920). 
Award
Details
Value £125,700
Contract Duration 18 months
Contractor Name MASTARCH Ltd
Contractor Size Small
Contractor Location Glasgow
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? Yes      
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer Scotland
Duty ☐
HR Policy Impact ☐ Data Protection Impact ☐ Environment / Carbon
Impact ☐
Risk Impact ☒ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☐
Communications Impact
☐
Armed Forces Covenant
Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer       
Page 97 of 100

Page 98

Contract Ref NLC-SLP-24-048
Title Kilsyth Surface Water Management Plan
Classification Services
Lead Service Area / Chief Officer Pamela Humphries, Chief Officer (Place)      
Competition Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on 3rd party frameworks
Procurement Route Call-off following Direct Award using Third Party Framework
No. of Framework Contractors 11
Award Criteria Best Value assessment, in accordance with the Framework Information
Comments This has been procured via Direct Award approach, considering the relevant information on 
Framework Contractors technical and commercial proposals available through Scotland Excel E&T
Consultancy Framework Lot 5 Drainage and Flooding (08-20).     
Award
Details
Value £65,489
Contract Duration 8 Months
Contractor Name AtkinsRealis UK Limited
Contractor Size Large Company
Contractor Location Surrey, UK 
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? Yes      
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer Scotland
Duty ☐
HR Policy Impact ☐ Data Protection Impact ☐ Environment / Carbon
Impact ☒
Risk Impact ☒ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☐
Communications Impact
☐
Armed Forces Covenant
Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer       
Page 98 of 100

Page 99

Contract Ref NLC-SLP-24-028
Title Eurocentral Strategic Active Travel Phase 1 and 2 Detailed Design, Phase 3 Options Appraisal and
Concept Design
Classification Services
Lead Service Area / Chief Officer Pamela Humphries, Chief Officer (Place)      
Competition Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on 3rd party frameworks
Procurement Route Call-off following Mini Competition using Third Party Framework
No. of Framework Contractors 12
No. of Bids Received 6
Award Criteria Most Economically Advantageous Tender, 40% Quality:60% Price
Evaluation Scores – Successful 87.50%
Evaluation Scores – Unsuccessful 77.17% - 85.28%
Comments Mini Competition from the Scotland Excel Engineering and Technical Consultancy Framework
Agreement (reference 08/20), Lot 2 (Transportation and Traffic).     
Award
Details
Value £239,725
Contract Duration 30 months
Contractor Name Stantec UK Limited
Contractor Size Large Company
Contractor Location Glasgow
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? No      
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer Scotland
Duty ☒
HR Policy Impact ☐ Data Protection Impact ☐ Environment / Carbon
Impact ☒
Risk Impact ☒ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☐
Communications Impact
☐
Armed Forces Covenant
Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer       
Page 99 of 100