Democracy Spraffa

Agenda Document Pack - Enterprise and Fair Work Committee - 30/08/2024

North Lanarkshire Council · 30 August 2024
Back to Enterprise and Fair Work Committee — 30 August 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

21 August 2024 
Members of the 
Enterprise and Fair Work Committee
Chief Executive’s Office
Archie Aitken
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk 
Notice is given that a Meeting of the Enterprise and Fair Work Committee is to be held in
the Council Chamber, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on Friday, 30
August 2024 at 10:00 AM which you are requested to attend. 
The agenda of business is attached. 
Archie Aitken
Chief Officer (Legal & Democratic) 
Members : 
Clerk Name: Clare Louise McDonald
Clerk Telephone: 01698 302190
Clerk Email: mcdonaldcl@northlan.gov.uk 
A McVey, F McKay, A Bustard, D Crichton, G Currie, P Di Mascio, K Docherty, K Duffy, A
Duffy-Lawson, H Dunbar, W Goldie, L Jarvie, J Leckie, F MacGregor, A Masterton, A
McCrory, B McCulloch, M McPake, L Mitchell, L Nolan, L Roarty, G Robinson, R Sullivan, A
Thomas, C Williams.  
Page 1 of 80

Page 2

Page 2 of 80

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical
Standards In Public Life Etc. (Scotland) Act 2000   
Operational   
2 Business Gateway Performance Update
Submit report by Chief Officer (Place) providing an
update on the insourcing of the Business Gateway
contract and an overview of the implementation of the
new BG National Service Specification. 
5 - 14 
3 Economic Regeneration Delivery Plan and
Performance Framework – Annual Progress
Updates
Submit report by Chief Officer (Place) providing an
update on the progress being made towards the
implementation and delivery of North Lanarkshire's
Economic Regeneration Delivery Plan and associated
Action Plan. 
15 - 58 
4 City Deal Programme Update
Submit report by Chief Officer (Place) providing an
update on the changes to the City Deal Programme. 
59 - 70 
5 Re-appointment of Category B Directors - Routes
to Work Ltd
Submit report by Chief Social Work Officer (Education,
Families, Justice & Integrated Practice) seeking
approval to re-appointment the four Category B
directors to the Board of Directors of Routes to Work
Limited. 
71 - 76  
Contracts   
6 Contract Awards Below Committee Approval
Threshold
Submit report by Chief Officer (Assets and
Procurement) acknowledging the contract awards
made since the last committee reporting cycle. 
77 - 80 
Page 3 of 80

Page 4

Page 4 of 80

Page 5

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    YW/PH Date 30/08/24 
Business Gateway Performance Update 
From  Pamela Humphries, Chief Officer (Place)  
E-mail weiry@northlan.gov.uk Telephone   Yvonne Weir
07508 001238 
Executive Summary 
North Lanarkshire Council has managed the delivery of Business Gateway Services on
behalf of both North and South Lanarkshire Councils since 1 April 2008. Between April 2008
and February 2024, the service has been delivered through outsourced contracts. Following
an options appraisal carried out during 2023, both Councils obtained Committee approval to
insource the service with effect from 1 March 2024 with North Lanarkshire Council delivering
the service on behalf of both Councils. 
This report provides an overview of the positive performance of the final Lanarkshire
Business Gateway outsourced contract, which was delivered by Enterprise North East Trust
Ltd., trading as Elevator (Elevator), during the period 1st March 2021 to 29th February 2024. 
The report also provides an update on the insourcing of the Business Gateway contract and
gives an overview of the implementation of the new BG National Service Specification which
was outlined at the February 2024 meeting of the Enterprise and Fair Work Committee. 
Recommendations
It is recommended that the Enterprise and Fair Work Committee: 
(1) Acknowledges the final outturn of the Business Gateway contract to 29 February 2024;
(2) Acknowledges that the Business Gateway Lanarkshire service is now being delivered
via an inhouse model and acknowledges the update on the new service specification
that is now being delivered across Lanarkshire 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (5) Grow and improve the sustainability and diversity of North
Lanarkshire's economy
Programme of Work Brighter Futures
Item 2
Page 5 of 80

Page 6

1. Background 
1.1 Business Gateway is a publicly funded service delivered through Scottish Local
Authorities providing access to free business support / impartial advice to start-up and
existing businesses in Scotland. Business Gateway has an important role to play  in
promoting an entrepreneurial culture within Scotland and stimulating awareness of, and
demand for, business support services (both public and private sector) among
Scotland’s business base. 
1.2 Business Gateway has the following service objectives: 
• Support more people with their ambitions to start a business; 
• Support more businesses to survive and achieve their growth ambitions 
• Support more people with their aspirations for high business growth; and, 
• Support more people from underrepresented groups to access mainstream
business support. 
1.3 Underpinning the service objectives there is a commitment to providing support across
a number of themes such as Carbon Reduction, Fair Work, Innovation,
Internationalisation, Digital Upskilling, Community Wealth Building, and Job Creation. 
1.4 The nature and intensity of the support provided will be determined by client needs and
ambitions, and the potential for economic impact, hence the expectation that those
offering higher growth potential will typically receive more intensive support. 
1.5 The Business Gateway Service directly supports the Plan for North Lanarkshire
Council, supporting the development of an entrepreneurial culture, and supporting the
establishment, sustainability and growth of businesses. 
2. Report 
Business Gateway Performance: 1st March 2021 to 29th February 2024 
2.1 The Business Gateway Lanarkshire service during the period of the former contract
had two key service areas: firstly, to support pre-start and new businesses trading less
than 12 months and secondly, to support existing businesses. The overarching aim of
the support was to increase the number of businesses per capita in Lanarkshire,
increase the productivity and outputs of Lanarkshire businesses, help them to access
new markets, introduce innovation, and ultimately create more and better paid jobs for
Lanarkshire residents. 
2.2 Services to support new businesses included one-to-one advice and support from a
dedicated business adviser, access to training workshops and webinars, market
research and online resources to help businesses successfully commence trading. The
table below outlines the number of client enquiries and new businesses supported
during the contract period 1 March 2021 to 28 February 2024, against the minimum
targets set in the contract: 
Number
Supported
% To target
Achieved
North
Lanarkshire
South
Lanarkshire
Client Enquiries 9,119 N/A 4,451 4,668
New Business
Starts
2996 99.87% 1526 1470 
Page 6 of 80

Page 7

2.3 During the 3-year contract period, 2,996 new start businesses were supported through
the service. This was against a target of 3000. 
2.4 Services to support existing businesses were delivered through the existing and
growing business service, which had three different strands: 
• Early Stage Growth: for new businesses that had early growth potential.
• Business Boost: for existing businesses that had modest growth potential.
• Growth Advisory Service: for existing businesses that had high growth potential. 
2.5 The support provided was tailored to meet individual circumstances and would typically
include: one-to-one advice and support from a dedicated business advisor to help
businesses create an action plan for growth, access to expert surgeries, accelerator
programmes, workshops and up to 21 hours of expert support from a qualified
consultant on a wide range of business topics including Finance, HR, Digital
Development, Innovation, Procurement and Marketing. 
2.6 The following table outlines the intensive support provided to growth businesses during
the contract period against the minimum targets set in the contract:    
Support Service Number of
Businesses
Supported
% To target
Achieved
North
Lanarkshire
South
Lanarkshire
Early Stage Growth 290 97% 136  154 
Business Boost 331 110% 143 188
Growth Advisory
Service
609 102% 288  321 
2.7 A total of 1,230 businesses received intensive support through the existing and growing
business service during the period of the 2021 - 2024 contract. This was against a
target of 1,200. 
2.8 In addition to the above, during the 3-year contract period, the following additional
outputs and outcomes were achieved: 
• 651 starts were projected to trade in excess of the VAT threshold within 12-18
months against a target of 1200 (54%)
• 246 locally delivered start up workshops were attended by 1763 participants
• 244 locally delivered existing business workshops were attended by 1479  
participants
• 3,966 hours of ad hoc support was provided to local businesses against a target of
4,200 (94%)
• 351 expert surgery sessions were delivered
• 2,369 businesses operating in local key sectors were supported against a target of
2,550 (93%)
• 732 existing businesses engaged with Business Gateway for the first time against
a target of 600 (122%)
• 1,411 businesses supported employed people under 25 years old against a target
of 1,500 (94%) 
• 1,179 business supported operated in areas of deprivation against a target of 300
(393%) 
Page 7 of 80

Page 8

Financial Performance Update   
2.9 The total cumulative spend for the contract period 1st March 2021 to 28th February 2024
was £3,344,942 against a total available budget of £3,449,772. The core reason for the
underspend of £104,830 was the decision not to spend the discretionary innovation
budget in year 2023/24. It was jointly agreed between NLC and SLC that the funds
would be used to support the cost of transitioning the service to an inhouse model. 
Quality / Customer Satisfaction Performance 
2.10 To monitor the local and national customer satisfaction rates, the Business Gateway
National Unit in CoSLA instruct an independent quarterly satisfaction survey. This is
issued to clients that have been supported through the service. 
2.11 The client satisfaction results averaged over the duration of the 3 years of the contract
are detailed in the following table with the national target of 80% exceeded across all
measures.   
Target North
Lanarkshire
South
Lanarkshire
Overall Satisfaction (Extremely
satisfied, very satisfied or satisfied)  80%  82.46%  86.92%
Service Met Expectations (Met or
exceeded expectations)  80%  84.20%  83.96%
Benefit the business will gain from
service received
(All saying yes, support will be beneficial
– excluding those who report it is ‘too
early to say’) 
80%  88.34%  87.48%
Would recommend Business Gateway
(Definitely or probably)  80%  85.06%  88.15% 
Insourcing of the Business Gateway Lanarkshire Service and Implementation of the
New National Service Specification 
2.12 In accordance with the options appraisal to consider future service delivery options,
which was undertaken in 2023 and subsequent committee approval, the Business
Gateway contract that had been held by Enterprise North East Trust Ltd was concluded
on 29th February 2024, with service delivery subsequently taken inhouse by North
Lanarkshire Council. 
2.13 The insourcing of the Lanarkshire Business Gateway Service contract gave rise to a
relevant transfer under the Transfer of undertakings (Protection of Employment)
Regulations 2006 (TUPE). On 1st March 2024, 20 members of staff previously
employed by Enterprise North East Trust Ltd were transferred to North Lanarkshire
Council. 
Page 8 of 80

Page 9

2.14 The team is based at Dalziel House, Motherwell in a large open plan office which is
shared with North Lanarkshire Properties. The building has bookable meeting rooms
and a training room which are used by advisers for client meetings and delivery of
training workshops. 
2.15 After an initial period of familiarisation with council systems, processes, procedures,
and mandatory training modules, all members of the team are now settled into their
new working arrangements with North Lanarkshire Council. 
2.16 The top priority for the team is to continue to deliver a high-quality Business Gateway
service. However, the intention is to change the geographic location of delivery by
having advisers engage with clients in their local area, rather than have clients travel
to a central location. Work is currently ongoing to identify suitable outreach locations in
both North and South Lanarkshire and outreach activities have already been held in a
range of areas including: The Job Centre and Broadwood Hub, Cumbernauld; Routes
to Work South, Cambuslang; The Hive, Airdrie; EK Collective, East Kilbride; WATIF,
Loanhead Farm; SLC Headquarters, Hamilton and Motherwell Library. 
2.17 A further priority for the service is to develop relationships between Business Gateway
and the other council departments that have business facing responsibilities across
both councils. A series of meet the team sessions have already taken place and more
are planned over the coming months. In addition, ongoing engagement and sessions
have been taking place with external stakeholders. 
2.18 The focus for the new service sees a move away from a contractual target driven
approach in favour of enabling advisers to have closer engagement and spend more
time with clients that have growth ambition and the potential for it to be realised. 
2.19  To support this approach a new system of client classification has been introduced and
there will be a focus on assessing the outcomes and impacts as a result of the support
provided, rather than the number of “activities” delivered. Work is underway to develop
a process to gather, record, analyse and measure the information to best understand
these outcomes and impacts. 
2.20 The new service specification will also involve the introduction of an aftercare service
which will be designed to improve the survivability of new start businesses. The details
of how this service will be delivered have still to be developed by the Business Gateway
National Unit. However, consideration is currently being given as to how aftercare
provision could be introduced in Lanarkshire, rather than wait for direction to be given
by Business Gateway National.  
2.21 In addition to the nationally recognised objectives for Business Gateway, the following
initial local objectives and priority customers have been identified aligned to both
councils’ priorities, plans and strategies: 
• Increase the reach of Lanarkshire Business Gateway across all communities
including a renewed focus and take-up of services from residents from rural
communities and priority SIMD areas
• Increase take-up of Lanarkshire Business Gateway services from under-represented
groups including long-term unemployed, economically inactive residents, carers,
young people, BAME, disabled people, restorative justice/offenders
• Increase focus and take-up of Lanarkshire Business Gateway services from Social
Enterprises, employee-owned businesses and co-operatives
Page 9 of 80

Page 10

• Inspire and increase engagement and take-up of services by young people focussing
on enterprise pathways in schools, college (New College Lanarkshire/South
Lanarkshire College), UWS, youth groups
• Working alongside sectoral plans provide Business Gateway services to key sectors
including construction, food and drink, creative industries, energy sector,
manufacturing/engineering services, tourism, transport & logistics
• Delivery of support to town centre businesses to support North Lanarkshire/South
Lanarkshire town centre action plans 
• Increase engagement with non-engaged businesses 
• Businesses who require additional support to survive 
3. Measures of success 
3.1  Delivery of an insourced operating model and approach will ensure Business Gateway
services are fully aligned and integrated with other council business-facing services.
Being aligned with the Plan for North Lanarkshire and Programmes of Work, along with
associated South Lanarkshire Council plans and services and within the available
budget envelope, to meet all performance and quality standards. 
3.2 As well as local measures of success, a new Performance Measurement Framework
is being put in place nationally for Business Gateway which will include: 
• Input Measures: resources committed to Business Gateway services (financial
and human resources); 
• Activity Measures: number of enquiries received, appointments, phone calls,
letters and emails completed, number of defined products delivered, number of
referrals made (internal and external partners), category referrals completed,
research requests made to the National Enquiry Service, aftercare activity and
number of event attendees are uploaded to the BG Datawarehouse ultimately
allowing a calculation of the number of unique clients supported. 
• Output Measures: number of businesses achieving a growth category (formerly
segmentation); number of completed action plans (including cross cutting themes,
for example sustainability, exporting, innovation, fair work which will provide a
degree of flexibility to meet changing economic priorities). 
• Outcome/Impact Measures: number of viable new business starts; improved
survival rates of new businesses; tracking employment in supported businesses;
level of business ambitions met. 
3.3 As the focus for the new Business Gateway Service is for advisers to spend more time
working with clients that have growth potential and that the Performance Measurement
Framework is substantially different from what has gone before, an initial set of
performance targets for the first year of in-house delivery; April 2024 to March 2025,
has been developed to reflect the new circumstances, as follows: 
• Pre-Start Clients Supported 2000
• New Business Starts  750
• New Business+ Starts  200
• Local Priority Projects  150
• BG Growth Projects  150
• Business Base   700
Page 10 of 80

Page 11

These proposed targets will remain under review during the first year of delivery. 
3.4 The quality of service delivery will continue to be measured by an independent third
party. The target will continue at 80% across the 4 key quality areas: Overall
Satisfaction, Expectations Met, Business Benefits, and Recommend Service. 
4. Supporting documentation 
4.1 There are no supporting documents. 
Pamela Humphries
Chief Officer (Place) 
Page 11 of 80

Page 12

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Business Gateway Services is a free service which is open and accessible to
all. The Service seeks to support individuals to become self-employed, set-up in
business, and support existing businesses to sustain existing jobs and to grow
creating more local employment opportunities and jobs for local residents. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The insourced Lanarkshire Business Gateway service is being delivered within its
approved budget of £1.15m per annum.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The insourcing of the Lanarkshire Business Gateway service included the TUPE
transfer of 20 individuals into North Lanarkshire Council. The transfer was
supported by People Resources and Legal and Democratic Services.
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Page 12 of 80

Page 13

Yes ☒ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☒ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The promotion and marketing of the Lanarkshire Business Gateway Service is
undertaken through a range of mediums including online, through social media
including video content, by email, events/workshops, networking and via the
publication of case studies. The service also complies with Business Gateway
National marketing and branding guidelines.
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
The risks associated with Service have been assessed and recorded in the
council’s Corporate Risk Register. A series of controls are in place to manage and
mitigate the risks and these are monitored on a regular basis. 
The key risks are:
• that the service is not delivered in line with the expectations of North and South
Lanarkshire Councils, local and national stakeholders
• that service delivery does not meet the expectations of individuals and
businesses that the service supports 
• that the service fails to provide a consistently high quality of advice to clients
and fails to meet targets.
The impact of these risks are that there would be fewer businesses set-up and
growing across Lanarkshire and also a reputational risk for Business Gateway in
Lanarkshire. 
Page 13 of 80

Page 14

5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Consideration will be given to the development and delivery of Business Start Up
workshops specifically aimed at ex-service personnel.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 14 of 80

Page 15

North Lanarkshire Council 
Report
Enterprise & Fair Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    MH/PH Date 31/08/24 
Economic Regeneration Delivery Plan and Performance
Framework – Annual Progress Updates 
From  Pamela Humphries, Chief Officer (Place)  
E-mail hyndsm@northlan.gov.uk  Telephone  Mark Hynds, 
07583 023248 
Executive Summary 
The purpose of this report is to update committee on the progress being made towards the
implementation and delivery of North Lanarkshire’s Economic Regeneration Delivery Plan
(ERDP) and associated Action Plan. The Action Plan is updated annually, and this progress
report details activity as at financial year end 2023/24. 
This report also presents the latest ERDP Performance Framework update which is used
to monitor wider ERDP performance over the short, medium and longer term (through to
2035). Unlike the ERDP Action Plan, figures within the Performance Framework are
reported on a cumulative basis to show the progress against the longer-term ambitions of
the ERDP. 
Recommendations
It is recommended that the Enterprise and Fair Work Committee: 
(1) Consider the content of this report and progress made towards the delivery of the
2023/24 ERDP Action Plan, which was approved by Enterprise & Fair Work
Committee in February 2023. 
(2) Acknowledge the wider progress and performance against the ERDP 2019-2023,
2023-2028 and beyond. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement
(2) Refocus our town centres and communities to be multi-
functional connected places which maximise social, economic,
and environmental opportunities
Programme of Work Transforming Places
Item 3
Page 15 of 80

Page 16

1. Background
1.1 The ERDP aims to help co-ordinate physical and economic regeneration activity across
North Lanarkshire, increase economic output and help address social and economic
inequality. 
1.2 The Economic Regeneration Delivery Plan (ERDP) was initially approved by the
Enterprise and Growth Committee in August 2019, covering the period 2019-2023. A
light-touch refreshed ERDP, covering the period 2023-2028, was then approved by
Enterprise and Fair Work Committee in February 2023. 
1.3 Since 2019, an Action Plan to support the delivery of the ERDP through a range of key
measures and investment programmes has also been produced and approved each
year by committee. The Action Plan sets the priorities for the financial year ahead,
reflecting progress made to date and the evolving priorities of the council. 
1.4 The 2023/24 Action Plan was approved by Enterprise and Fair Work Committee in
February 2023 and the current 2024/25 ERDP Action Plan was approved in February
2024. 
1.5 An accompanying ERDP Performance Framework was approved by Enterprise and
Growth Committee in February 2021. This comprises of a group of performance
indicators at three levels. These indicators aim to collectively provide an overview of
how the North Lanarkshire economy is performing as well as helping us to understand
the impact that the delivery of the ERDP is having on improving economic opportunities
and outcomes for all. 
2. Report 
2.1  Economic Regeneration Delivery Plan 2023-2028 
2.1.1 The refreshed ERDP continues to focus on the same four key inter-related themes as
the 2019-23 plan:
• Developing housing that promotes improved quality of life and creates a better
place to live;
• Reshaping our town centres to ensure that these provide modern and attractive
centres that meet the needs of our communities;
• Improving our business and industrial infrastructure, creating opportunities for
investment and for companies to start-up or relocate here; and
• Continuing to improve our connectivity and develop new opportunities by
transforming our road, rail and digital infrastructure.  
2.1.2 To support the delivery of these objectives, annual ERDP Action Plans have been
developed each financial year since 2019/20. 
2.2 2023/24 Action Plan – Performance Review 
2.2.1 Appendix 1 provides an update on the ERDP Action Plan objectives and targets
achieved during 2023/24.   
2.2.2 Good progress continues to be made against the ERDP’s key objectives with highlights
during 2023/24 including:
• The delivery of an additional 335 new build council homes via the New Supply
Page 16 of 80

Page 17

• Programme, as well as a further 126 Open Market/Empty Homes Purchase
Scheme completions, taking total completions to 2,104 by 31 March 2024
(including Open Market Purchase Scheme);
• Committee approval of Town Action Plans (TAPs) for Airdrie, Motherwell and
Wishaw in November 2023 with a second phase of TAPs produced and publicly
consulted on for Bellshill, Kilsyth and Shotts during 2023/24 (which were
subsequently approved in May 2024);
• The acquisition of The Centre Cumbernauld in June 2023, following £9.225m
secured from the UK Government’s Levelling Up Fund, marking a major milestone
in the redevelopment of Cumbernauld town centre;
• Springhill Community Hub, managed by Getting Better Together Shotts, officially
opened in September 2023;
• The council secured £150k funding from National Lottery Heritage Fund and
Historic Environment Scotland to develop plans for the heritage led regeneration
of Airdrie town centre, the Rediscovering Airdrie project; 
• Fusion Assets remediated 2.55 hectares of land at Plot 1, Ravenscraig;
• Significant progress was made on the delivery of City Deal projects, such as the
Ravenscraig Access infrastructure with the West Coast Mainline crossing rail
bridge installed at Ravenscraig in April 2023;
• A consultant team was appointed to commence detailed design works for the East
Airdrie Link Road;
• Considerable progress has been made to migrate the last remaining sites across
to the new fibre CommsWorld network, with 96% of sites currently connected. 
2.3 ERDP Performance Framework 
2.3.1 The ERDP Performance Framework also highlights significant progress in improving
economic opportunities and outcomes for North Lanarkshire’s residents and
businesses. Highlights achieved as at 31 March 2024, included: 
• 1,351 new build council homes complete
• 753 homes brought into council ownership via the Open Market Purchase Scheme,
including some homes previously sold under the Right to Buy. 
• £92 million invested in town centre (including edge of town) developments, of which
around £44 million was secured via external funding sources.
• Town Visions created for all eight North Lanarkshire towns;
• Town Action Plans (TAPs) approved for Airdrie, Motherwell and Wishaw (November
2023)
• TAPs were developed for Bellshill, Kilsyth and Shotts (and subsequently approved
in 2024/25).
• 1,692 new affordable town centre homes completed (including edge of town sites)
by the council and housing associations. This includes developments across most
of our towns with completed sites including Caledonian Avenue (Bellshill), Berryhill
Road (Cumbernauld), 95 Main Street (Kilsyth) and Roberts Street (Wishaw)
amongst others.
• 132,910 sq.ft of business and industrial workspace created or refurbished as a
result of investment by NLC, Fusion Assets and North Lanarkshire Properties
(NLP).
• £55.16m (TBC) invested in key road infrastructure projects funded via NLC and the
Glasgow City Region City Deal 
Page 17 of 80

Page 18

3. Measures of success 
3.1  The purpose of this report is to highlight the key actions, targets and indicators that are
used to measure and monitor the delivery of the ERDP through the ERDP Action Plan
and Performance Framework. 
4. Supporting documentation 
4.1 Appendix 1 Economic Regeneration Delivery Plan (ERDP) Action Plan 2023/24 –
End-Year Performance Report 
4.2 Appendix 2 ERDP Performance Framework (June 2024) 
Pamela Humphries
Chief Officer (Place)  
Page 18 of 80

Page 19

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 19 of 80

Page 20

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Risks are recorded and managed within Corporate Risk Register. 
Key risk is failure to deliver on the ERDP and its objectives of helping co-ordinate
physical and economic regeneration activity across North Lanarkshire, increasing
economic output and helping address social and economic inequality. This would
result in the loss of additional economic and social benefits to residents and
business across North Lanarkshire and significant reputational damage to the
Council given the widespread public nature of the programme. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 20 of 80

Page 21

Appendix 1 
ERDP Action Plan 2023/24
End-Year Performance Report 
Page 21 of 80

Page 22

Theme: Live
ERDP Priority 1: Developing housing that promotes improved quality of life and creates a better place to live
Ref ERDP Action 2023-24 Target What we achieved 
(2023-24)
RAG
1.1 Deliver new build
housing via NLC’s New
Supply Programme
Complete 276 new build council
homes during 2023/24 
335 new build council homes completed during 2023/24. As at end
of 2023/24, 1,351 new build council homes have been completed. 
A further 279 homes are currently under construction.
G
1.2 Bring homes into
council ownership via
NLC’s Open Market
/Empty Homes
Purchase Schemes,
including homes
previously bought
under the Right to Buy
scheme
75 Open Market /Empty Homes
Purchase Scheme completions
during 2023/24
126 Open Market/Empty Homes Purchase Scheme completions
during 2023/24.
G
1.3 Enable the private
sector to support the
delivery of the New
Supply Programme, via
off the shelf
purchases.
Progress the delivery of a further 50
new build acquisitions during
2023/24.
A total of 82 affordable homes delivered on mixed tenure sites via
private developers in 2023/24. A further five projects, with a total of
76 homes, due to be delivered via off the shelf purchases in
2024/25.
G
1.4 Prepare and support
the delivery of the
Strategic Housing
Investment Plan (SHIP)
Prepare the 2024/25 SHIP which
will identify sites to meet Local
Housing Strategy priorities and
maximises the use of available
Scottish Government grant
funding. 
Support the delivery of sites within
the current 2023/24 SHIP.
SHIP (2024/25 ‐ 2028/29) formally approved and published on NLC
website.
SHIP (2025/26) currently being developed. Due for submission by
30 October 2024.
G
Page 22 of 80

Page 23

Theme: Invest
ERDP Priority 2: Reshaping our town centres to ensure that they provide modern and attractive centres that meet the needs of our
communities
Ref ERDP Action 2023-24 Target What we achieved 
(2023-24)
RAG
2.1 Co-produce a series of
Town Action Plans with
local communities to
enable the realisation
of the Town Visions
Finalise the first four Town Action
Plans in Airdrie, Cumbernauld,
Motherwell and Wishaw. 
Town Action Plans for Bellshill,
Coatbridge, Kilsyth and Shotts in
development for completion mid-
2024.
Following a period of public consultation, Town Action Plans for
Airdrie, Motherwell and Wishaw were approved by Enterprise & Fair
Work Committee in November 2023. 
Enterprise & Fair Work Committee (Nov 2023) also approved that a
Masterplan would be developed for Cumbernauld, rather than a
Town Action Plan. This is to reflect the scale of the regeneration
activity that will be required following the proposed demolition of
The Centre Cumbernauld. 
Town Action Plans for Bellshill, Kilsyth and Shotts were developed,
following public consultation, and approved by Enterprise & Fair
Work Committee in May 2024. 
A long-term plan for Coatbridge, aligned to the Town Vision, will be
developed during 2024/25 to secure and draw down the first
tranche of the £19.5 million allocated to Coatbridge over the next
10 years from the UK Government.
G
2.2 Develop a sense of
place by protecting,
repurposing or
redeveloping vacant,
derelict or unused
priority buildings and
sites within our town
centres and investing
in town centre
regeneration activity
Continue to engage with local
property/landowners with a view to
acquiring key town centre
properties/sites earmarked for
conversion/improvement.
Officers continued to engage with property/landowners during
2023-24 with a view to acquire key properties and parcels of land
across various towns such as Coatbridge, Cumbernauld and
Motherwell. Some of these negotiations are currently ongoing. 
The council acquired The Centre Cumbernauld in June 2023, a
major milestone for the proposed regeneration of Cumbernauld
town centre.
G
2.3 Deliver or support the delivery of
52 new affordable homes within
29 affordable homes were delivered by Clyde Valley Housing
Association at Parkfoot Street Kilsyth. When targets were set, this
A
Page 23 of 80

Page 24

that will support the
delivery of the Town
Visions
our town centres (including edge of
town) during 2023/24
development had been estimated to deliver 32 units, in line with
the Strategic Housing Investment Plan (SHIP). 
The completion of the redevelopment of the former Orrs building at
South Bridge Street, Airdrie was delayed slightly. However, this did
complete in May 2024. NLC acquired 20 new build units which
were delivered as an off-the shelf purchase as part of the New
Supply Programme. 
2.4 Support new
investment in North
Lanarkshire’s town
centres
Deliver the Scottish Government’s
Place Based Investment
Programme allocation for 2023/24.
NLC was allocated £1.698m via the Scottish Government’s Place
Based Investment Programme for 2023/24. This was fully
contractually committed. 
Projects that benefited from PBIP funding during 2023/24 include
Glenmanor Greenspace (Moodiesburn);  28 Hamilton Road
(Motherwell); Braidhurst Industrial Estate (Motherwell);  
Strathclyde Park (feasibility works) and Motherwell Station active
travel route.
G
2.5 Engage with local community
organisations to enable
applications to third party
regeneration funds, where
appropriate. 
Continue to  support 2 existing
community led projects funded
under previous RCGF
rounds. 
Submit bids to any relevant
regeneration challenge funds
announced by the UK Government,
Scottish Government, or other
relevant external funding bodies.
The council invited Expressions of Interest (EOIs) from local
community groups and third sector organisations during 2023/24
to explore and develop project ideas which may be eligible for
Scottish Government funding via the Regeneration Capital Grant
Fund (RCGF) and Vacant and Derelict Land Investment Programme
(VDLIP). 
Applications were made to both of these Funds. However, the
Scottish Government advised that these programmes have been
paused during 2024/25 due to budget constraints. 
Getting Better Together Shotts was awarded funding from the
previous round of RCGF to develop the Springhill Community Hub
and the Growth Team supported this community led project to be
delivered. The Springhill Community Hub officially opened in
September 2023, providing accommodation for community groups
G
Page 24 of 80

Page 25

and clubs, as well as meeting space, an outdoor play area and a
cycle pump track. 
Other community led projects (Reeltime and The Well Hub) 
funded under previous RCGF rounds were also supported and
continued to progress. 
The Growth Team submitted a funding bid to the National Lottery
Heritage Fund (NLHF) and Historic Environment Scotland (HES)
and was awarded £150k to develop plans for the Rediscovering
Airdrie project which focuses on the heritage led regeneration of
Airdrie.
Theme: Work
ERDP Priority 3: Improve our business and industrial infrastructure, creating opportunity for investment and for companies to start-up or
relocate here
Ref ERDP Action 2023-24 Target What we achieved 
(2023-24)
RAG
3.1 Improve the provision
of high-quality
business and
industrial space either
directly or through our
ALEOs or Joint
Ventures
NLC and Fusion Assets to invest a
minimum of £2.3m in key business
and industrial projects. 
NLC and ALEO funding only. 
Fusion Assets invested £1.3m of its own capital on the
construction of Building 2 at Link Park, Newhouse during 2023 -
2024. 
Around £2.8m council capital funding has been allocated to the
Braidhurst Industrial Estate regeneration project. However, this will
be spent in 2024/25 as external funding was secured and invested
into this project during 2023/24 instead.
A
3.2 £3.45m external funding (including
private sector funding) to be
secured by NLC/Fusion Assets for
business and industrial
infrastructure in
2023/24.
NLC and Fusion Assets secured and invested £4.95m external
funding in key business and industry projects during 2023/24,
including: 
£656k of Vacant and Derelict Land Fund (VDLF) monies were
invested in a second phase of enabling works at Link Park,
Newhouse and £1.9m in an initial phase of enabling works at
Ravenscraig during 2023 - 2024. 
G
Page 25 of 80

Page 26

Fusion Assets also invested £427k of VDLF at Condor Park,
Eurocentral. These works were later completed in May 2024. 
Braidhurst – £628k Scottish Government Place Based Investment
Programme (PBIP) monies spent on design team fees, surveys,
utility connections and statutory fees and £1.16m Scottish
Government Regeneration Capital Grant Funding spent on
construction works during 2023/24 only. Works are continuing and
further investment will be made during 2024/25. 
£182k was also invested from Scottish Government’s PBIP in
refurbishing a retail unit at 28 Hamilton Road, Motherwell. This
project has since completed during 2024/25. 
3.3 2.0ha of land to be remediated or
improved (by NLC or Fusion
Assets) for business and industry
use in 2023/24.
Fusion Assets remediated 2.55 hectares of land at Plot 1,
Ravenscraig during 2023/24.
G
3.4 16,500 sq.ft of business and
industrial workspace to be created
or refurbished by NLC, Fusion
Assets and North Lanarkshire
Properties (NLP) in 2023/24.
Fusion Assets completed the construction of a new 15,500  sq.ft,
net zero carbon enabled, industrial building at Link Park,
Newhouse during 2023/24. 
Works progressed to develop 10,300 sq.ft of new workspace and
upgrade 17,000 sq.ft of existing NLP owned units at Braidhurst
Industrial Estate which is scheduled to complete during 2024/25. 
Works also progressed on 28 Hamilton Road, Motherwell to
refurbish 448 sq.ft of retail floorspace at this key site at the
entrance to Motherwell town centre. This project has since
completed during 2024/25. 
A
Page 26 of 80

Page 27

3.5 Ensure our investment
opportunities deliver
economic
opportunities and
outcomes for all
Progress delivery of a regeneration
scheme for Braidhurst Industrial
Estate, including the provision of
new start-up units and
refurbishment of existing units
owned by North Lanarkshire
Properties.
A works contractor was appointed in October 2023 to deliver the
regeneration of Braidhurst Industrial Estate.
Works are currently underway and are scheduled for completion in
2024/25. This project is expected to deliver 10 new build business
start-up units and the refurbishment of 6 existing NLP owned units
as well as environmental and general infrastructure improvements
throughout the estate.  
G
3.6 Develop a Business and Industry
Strategy in line with investment
opportunities, site prioritisation
and future market demand.
This action has been carried forward to the 2024/25 ERDP Action
Plan. A business and industry strategy and accompanying action
plan will be developed to form part of the evidence base for the
next Local Development Plan. This development work is currently
underway. 
A
Theme: Invest
ERDP Priority 4: Improve our connectivity and develop new opportunities by transforming our road, rail and digital infrastructure
Ref ERDP Action 2023-24 Target What we achieved 
(2023-24)
RAG
4.1a Continue to deliver the
City Deal Programme
Continue to progress delivery of
Ravenscraig Access Infrastructure
to support the redevelopment of
Ravenscraig and connect the M74
to M8 as part of Pan Lanarkshire
Transport Corridor. 
Complete West Coast Mainline
Crossing.
The West Coast Mainline crossing is now completed and in place. G
4.1b Full Business Case (FBC) approval
for the Motherwell to Ravenscraig
access (new roundabout at Airbles
Road/Windmillhill Street junction;
dual carriageway from the junction
Additional design work was required on the drainage design for the
new access road, which resulted in a revised procurement and
delivery strategy being developed which in turn has delayed the 
submission of the Full Business Case.  
A
Page 27 of 80

Page 28

to Ravenscraig Regional Sports
Facility. 
4.1c Commence construction of
Motherwell to Ravenscraig access
Refer to update above (4.1b). A
4.2a Continue to progress delivery of
the East Airdrie Link Road (EALR).
Procure and appoint consultant
team for Stage 3 (Detailed Design
and Planning Application).
Procurement for the DMRB Stage 3 consultants has been
concluded with a consultant team appointed in Q4 23/24.
G
4.2b East Airdrie Link Road -
Commence detailed design.
The consultant appointed to progress the East Airdrie Link Road
DMRB Stage 3 commission commenced in Q4 24/25 on route
design review and preliminary design.
G
4.3 Improve Motherwell Town Centre
transport interchange to support
active and sustainable travel.
Complete works at Motherwell Rail
Station (ScotRail) and Muir Street
(NLC) during 2023/24.
The Muir Street Interchange contract and Motherwell Rail Station
contracts were completed in May 2023 and June 2023 respectively.
Discussions are continuing with the contractor on defects
correction and final account resolution.
G
4.4a Full Business Case (FBC) approval
for the Orchard Farm Roundabout.
The delivery of this project is being led by a private sector
partnership, with a £2m contribution of the capital costs to be
made from the City Deal programme, subject to finalisation of a
funding agreement and confirmation from the partnership of the
full construction funding package being in place. 
Progress stalled over 23/24 financial year, both on conclusion of
the funding agreement and progression of tender action by the
private sector partnership, due to longer than anticipated technical
R
Page 28 of 80

Page 29

approval timescales and funding assembly issues. This has
delayed submission of the FBC. The revised target date for
submission is now summer 2025.
4.4b Appointment of contractor to
deliver the Orchard Farm
Roundabout to support the
development of key business and
industrial sites on the A8/M8
corridor.
Refer to update above. The revised target date for appointment of a
contractor to deliver the Orchard Farm roundabout is now Autumn
2025.
R
4.5 Progress delivery of the
Eurocentral Strategic Active Travel
project. 
Appoint consultants to develop
detailed design proposals during
2023/24
Due to the scale of the project, a phased approach will be taken to
design and delivery. 
Detailed design work will be progressed over 2024 and early 2025.
Subject to Full Business Case approval, it is planned to commence
construction on the first phases during 2025. Completion of the
City Deal funded phases is projected for March 2027. 
A
4.6 Support and enable
investment in active
travel
Deliver phase 2 of the Ravenscraig
Active Travel Links from
Meadowhead Road to Robberhall
Road.
Delivery of Phase 2 of the Ravenscraig Active Travel Links project
was completed in summer 2023.
G
4.7 Undertake feasibility studies to
support the development of active
travel routes across North
Lanarkshire.
In partnership with South Lanarkshire Council, four active travel
cross boundary connections were taken to concept design:
Waterloo to Law; Uddingston to Bellshill; A725 to Strathclyde
Country Park; and Bothwell to Strathclyde Country Park
G
4.8 A further 6km of active travel
routes to be enhanced or created
during 2023/24, linking
communities, arterial routes and
transport hubs with town centres
3.74 kms of active travel infrastructure was enhanced or created 
in 23/24 throughout the area including Airdrie, Wishaw and
Coatbridge.   
A
Page 29 of 80

Page 30

and key business locations in
North Lanarkshire.
Construction of the Glasgow Road, Wishaw Active Travel project
commenced in 2023/24, with all works to be completed during
2024/25. 
Riverbank and Newmains community hubs were opened in
Coatbridge and Wishaw, incorporating improved active travel
links/paths surrounding the Hubs, and on site cycle storage
facilities. 
4.9 Deliver a worldclass
digital Infrastructure
across North
Lanarkshire
Fibre infrastructure to be fully
delivered by June 2023. 
This infrastructure is key to then
enable other call off contracts, one
of which is Public Wi-Fi, which
when delivered, will be the single
Public Wi-Fi service that will
incorporate Town Centres and any
public use buildings and spaces
that are deemed to require it. 
This new infrastructure will be an
enabler for further digital
opportunities throughout North
Lanarkshire. 
Through the Community Benefits
and Added Value elements of
the contract, key actions will be
delivered throughout 2023-24
including:
• Recruitment of additional 3
apprentices through the NLC/
With regards to fibre infrastructure, there has been considerable
progress made to migrate the last remaining sites across to the
new fibre CommsWorld network. 96% of sites are currently
connected. The remaining 4% of sites are affected by road
infrastructure issues, which are being addressed, to allow for
completion of the project. 
Public Wi-Fi is underway with deployment split into quick to deploy
sites (reusing existing council wireless infrastructure) and those
sites requiring deployment of new physical infrastructure by
CommsWorld technology. Pilots are underway with the current
expectation of the “quick to deploy” sites being delivered by end of
Q2 2024/25. 
Works also progressed with smart park technology deployed via an
Intelligent Lighting System within Palacerigg and Strathclyde
country parks. Electrical connections remain outstanding due to
duct blockages but are expected to be operational by end of
August 2024. 
Key Highlights of Community Benefits delivered throughout
2023/24 included:
• modern apprentices recruited and shared between the council
and Commsworld.
A
Page 30 of 80

Page 31

Commsworld Shared
Apprenticeship model.
• Continued delivery of
SmartSTEM/ Young Enterprise
Scotland
programme in Schools
• Provision of work experience
placements
• Delivery of a digital showcase for
businesses
• Development of activity to
maximise the uptake of Scottish
and
national broadband voucher
schemes
• Development and delivery of
actions to support community
engagement, empowerment and
capacity building
• 2 flagship events were delivered in partnership with
SmartSTEM at New College Lanarkshire one for Primary and
one for Secondary schools. 
• 20 workshops for primary schools were delivered, highlighting
careers in STEM
• 10 Circular Economy Challenge Events delivered for schools.
• Flagship business event held in Motherwell Concert Hall on 19
April 2023 to highlight how digital technology and skills can
promote business growth.
• Mapping of digital services  developed and launched,
highlighting venues and digital services available across all
communities in North Lanarkshire 
Page 31 of 80

Page 32

Appendix 2 
Economic Regeneration Delivery Plan (ERDP)
Performance Framework 
June 2024 
Page 32 of 80

Page 33

Introduction 
Improving economic regeneration plays a significant part in our shared ambition to make North Lanarkshire the place to live, learn, work, invest and
visit.
The Economic Regeneration Delivery Plan (ERDP) sets out how we will improve economic opportunities and outcomes for everyone in North
Lanarkshire. This includes delivering new homes, reshaping town centres, attracting investment and jobs. Our investments will benefit everyone who
lives, learns, invests and visits within North Lanarkshire.
An ERDP Action Plan is updated annually and focuses on our key objectives and day‐to‐day activities in delivering the longer‐term vision set out
within the ERDP and The Plan for North Lanarkshire.
The ERDP Performance Framework comprises a set of performance indicators at three levels. These indicators aim to collectively provide an
overview of performance that helps us to understand the impact of our work on improving economic opportunities and outcomes for all. 
Given the shared ambition set out within The Plan for North Lanarkshire, the ERDP Performance Framework is closely aligned to the corporate
Strategic Performance Framework. 
This framework aims to produce evidence that allows for day‐to‐day activities, and progress towards improving economic opportunities and
outcomes for all to be regularly monitored, reported, assessed, and scrutinised.
It will also enable performance issues against the ERDP’s key priorities to be identified and addressed, mitigating the risk of delivery failure. 
The ERDP Performance Framework will be kept under review to ensure arrangements remain effective and aligned to future versions of the ERDP and
The Plan for North Lanarkshire. 
Page 33 of 80

Page 34

ERDP Performance Framework 
The three levels of performance indicators form an interrelated set, with operational measures supporting improvements to services and outcomes
for North Lanarkshire’s residents and businesses in the short, medium, and long‐term. The three levels are summarised below: 
Level 1: The North Lanarkshire Economic Context 
A suite of ‘state of the nation’ health check indicators which collectively provide the North Lanarkshire economic context. 
These indicators are often at a macro level and out with the sole control of the Council. As such, these indicators do not have targets set against
them, instead they set out the intended direction of travel. This approach is consistent with The Plan for North Lanarkshire Strategic Performance
Framework. The ERDP framework uses 5 of the 28 indicators set out in the Strategic Performance Framework to assess the performance of the North
Lanarkshire economy. 
Data comes from national sources such as the Office for National Statistics (ONS) or Scottish Local Authority Economic Development (SLAED)
Performance Reports. As data is reported in a consistent manner nationally, North Lanarkshire can be benchmarked against Scotland and
comparator authorities across the Glasgow City Region. 
Level 2: Improving economic opportunities and outcomes for all 
A suite of indicators and information to enable an assessment of progress towards our long‐term vision of improving economic opportunities and
outcomes for all. 
When measuring outcomes there is often a delay in being able to demonstrate that outcomes have been achieved, or it may not be clear how much
of a change in an outcome can be attributed to NLC’s actions alone, or if external factors have influenced the outcome. Therefore, some of these
indicators do not have targets set against them but will instead be used for benchmarking purposes. 
The group of performance indicators at all three levels in the ERDP Performance Framework therefore aims to collectively demonstrate
improvements to outcomes in the long‐term, while demonstrating effective use of resources in the short term (the latter through monitoring and
measuring day to day operations). 
Page 34 of 80

Page 35

Level 3: Day to day operations 
These performance indicators allow the quality, efficiency, and effectiveness of day‐to‐day operations to be assessed. They include targets in the
short‐term (current financial year), medium‐term, by the end of the current ERDP cycle (2027/28) and longer‐term (2035). 
Targets are cumulative from the baseline onwards (not additional to previous target). For example, the 1,400 Open Market Purchase Scheme
completions by 2035 includes the 630 completions which have already been achieved by March 2023. Relevant teams across Place are identified
against each indicator to ensure accountability. The inclusion of input and output measures, and understanding how these lead to improved
outcomes, will be an important factor in determining the success of the Framework and Economic Regeneration Delivery Plan. 
Page 35 of 80

Page 36

ERDP Performance Framework: Level 1 
The North Lanarkshire Economic Context
Indicator Baseline Last available
update
Measuring
this will tell
us if we
have…
What
success
looks like
Intended
direction
of travel
Latest
direction of
travel
North Lanarkshire
Commentary
Growth in Gross
Value Added
(GVA) (income
approach)
2016 
NL
+3.7% 
Scotland 
+3.2%
2021 
NL
+5.2% 
Scotland
-3.7%
Increased
North
Lanarkshire’s
economic
output
Continued
economic
growth in
North
Lanarkshire  
The latest data published
shows that GVA growth
remains positive, suggesting
NLs economy continues to
grow. This follows a dip in the
previous year which mirrored
the national position. 
The latest data shows a 5.2%
increase in GVA per head in NL
from 2020 to 2021 which
reverses the previous year's
declining figure of -3.7% and
starts to return the level of
growth to the pre-pandemic
position of 6.6%.
Gross weekly
pay (residents)
– full time
employees
2018 
NL 
£548.90 
Scotland
£562.70
2023 
NL
£705.70 
Scotland
£702.40
Increased
the earnings
of people
who live in
North
Lanarkshire
Earnings for
people who
live in North
Lanarkshire
continue to
grow on a par
with national
levels  
Gross weekly pay for NLs
residents became higher than
the average earnings for
Scotland and GB for the first
time ever in 2022; latest
results shows this positive
position remains in 2023. 
Page 36 of 80

Page 37

% of all
economically
active (16‐64
years)
Oct 2017/Sept
2018 
NL 
77.9% 
Scotland
77.6%
Oct 2022/Sept
2023 
NL
75.0% 
Scotland
77.9% 
Increased
the number
of North
Lanarkshire’s
residents in
employment
More people
aged 16 to 64
living in NL
are
economically
active and
contributing
to the local /
national
economy  
The latest result as at
September 2023 equates to
171,100 residents
economically active in NL; this
is an increase from March
2020 (170,700) but figures
have not yet returned to
the pre-pandemic level in
2019 (174,000).
% of VAT/PAYE
registered
businesses that
survive for at
least three
years 
2016 
NL
58.7% 
Scotland
62.1% 
2019 
NL
54.0% 
Scotland
57.0% 
Note: data
released
November 2023
Increased
and
sustained
new
businesses
in North
Lanarkshire
More locally
generated
and
incoming
businesses
being
created,
surviving,
and
sustaining in
the longer-
term  
The latest business survival
rates in North Lanarkshire
show a varying position. 
54% of North Lanarkshire
based businesses registered
in 2019 survived for at least
three years. This represents a
slight decrease from the
previous year (58%). However,
these businesses were in their
infancy during when the Covid
pandemic hit during 2020 and
trading conditions were
extremely challenging. 
This downward trend does
follow the national average,
although at a slightly greater
decrease 
Page 37 of 80

Page 38

% of working
age people (16‐
64) claiming
one or more of
the key benefits
Dec 2018 
NL
3.5% 
Scotland
2.8%
Dec 2023 
NL
3.3% 
Scotland
3.0%
Reduced the
number of
residents
reliant on
employment
related
benefits
All of North
Lanarkshire’s
residents
capable of
working are
sustaining
employment  
The latest figure equates to
7,320 people claiming work
related benefits in NL as at
December 2023 - a 7%
decrease from the December
2019 claimant count of 7,890
(pre-pandemic levels), but
only a decrease of 100 from
7,330 as at December 2022. 
ERDP Performance Framework Level 2: 
Improving economic opportunities and outcomes for all
Key
Performance
Indicator
What does this tell us? Baseline First ERDP
Review
(By 31 March
2023)
Short-term
(By 31 March 2024)
Medium-term
By next ERDP
Review
(By 31 March
2028)
Long-term
(By 31 March
2025) 
Target Actual Target Target
Estimated
number of
construction
jobs (PYEs)
created
The number of gross
construction jobs (PYEs)
created as a result of ERDP
related investment by NLC and
our ALEOs across North
Lanarkshire. 
Construction jobs created as a
result of physical regeneration
projects occur during the
construction phase of the
project only and do not recur
once the development is
796 1,849 2,569 2,539 4,784 7,626 
Note: this
does not take
account of
additional
construction
jobs created
as a result of
follow-on
private sector
developments
enabled as a
Page 38 of 80

Page 39

operational. 
Therefore, these figures are
reported as Person Year
Equivalents (PYEs) rather than
Full‐time Equivalents (FTEs).
result of NLC
investments. 
Estimated
number of
gross full‐time
equivalents
(FTEs) created
The estimated number of
gross jobs (FTEs) created as a
result of ERDP related
investment by NLC and our
ALEOs across North
Lanarkshire. 
The gross number of jobs
created does not take account
of factors such as
displacement. 
This measures the follow on
impact generated once the
physical works have been
completed and the new
infrastructure is being put to
economic use.
As these outcomes only occur once projects are operational, there will be a
delay in demonstrating this outcome has been achieved. 
Therefore, this indicator has a long‐term target to 2035 only. 
Note: 
This jobs figure is based on investment across North Lanarkshire Council’s
New Supply Programme, City Deal Programme, and the Regenerating
Cumbernauld project. Fusion Assets investments are also included.  
13,349
Estimated
number of net
additional full-
time
equivalents
(FTE) created 
The estimated number of net
jobs (FTEs) created as a result
of ERDP related investment
by NLC and our ALEOs across
North Lanarkshire. 
Under this measure, the gross
number of jobs created is
adjusted to better assess the
As these outcomes only occur once projects are operational, there will be a
delay in demonstrating this outcome has been achieved. 
Therefore, this indicator has a long‐term target to 2035 only 
Note:
This jobs figure is based on investment across North Lanarkshire Council’s
New Supply Programme, City Deal Programme, and the Regenerating
Cumbernauld project. Fusion Assets investments are also included.  
6,879
Page 39 of 80

Page 40

true extent of the likely impact
of the ERDP on the local
labour market and economy. 
This measures the follow‐on
impact generated once the
physical works have been
completed and the new
infrastructure is being put to
economic use.
Town centre
vacancy rates
‐ % of vacant
commercial
units as a % of
total units
across North
Lanarkshire’s
town centres.
This indicator measures the
level of vacant units within
town centres. 
The ERDP aims to create
vibrant mixed‐use towns
where people live, work, shop,
eat, and access local services.
As such, recognition needs to
be given to the fact that
vacancies may temporarily
increase where vacant
possession of redundant retail
centres or land assembly is
required to enable
transformative change
18.9% 
Year:
2018/19
This measure will be used for benchmarking purposes only and
therefore no targets have been set. 
2022/23 ‐ Latest published data shows that North
Lanarkshire’s town centre vacancy rate was 18.7%, above the
Scottish average of 11.6% and approximately the same as measured in
2017/18.
% of
immediately
available
employment
land
The purpose of this measure is
to contribute to the
assessment of how ‘investor
ready’ North Lanarkshire is in
terms of providing the
65.7% 
Year:
2017/18
This measure will be used for benchmarking purposes only and therefore no
targets have been set. 
2022/23 ‐ Latest published data shows that 70.4% of North Lanarkshire’s
employment land was ‘immediately available’. This is higher than the Scottish
average of 62.0%. 
Page 40 of 80

Page 41

necessary infrastructure for
new and growing businesses,
including inward investment. 
Employment land includes
any land that is immediately
available for business use,
which means it is fully
serviced and marketed, as
opposed to simply designated
for employment/industrial use
in the Local Development
Plan. The land is therefore
immediately available for
business expansion or
relocation purposes.
The 2022/23 NL figure is in line with the previous year (2021/22) which was
70.6%. 
Given levels of developable land available, the council is currently developing a
Business & Industry Strategy for North Lanarkshire which will aim to identify
how council investment in such land should be prioritised.
Commercial
planning
applications‐
average time
(weeks) to
process
business and
industry
planning
applications
Planning applications are
important in terms of the
future development and use of
land across our towns and
communities. 
An efficient and well‐
functioning planning service
plays an important role in
facilitating sustainable
economic growth and
delivering high quality
development in the right
places. 
This indicator shows how long
the council takes to deliver
6.9 weeks 
Year:
2017/18
This measure will be used for benchmarking purposes only and therefore no
targets have been set. 
2022/23 – North Lanarkshire 9.6 weeks, compared to a Scottish
average of 12.0 weeks 
The North Lanarkshire processing time has reduced from 13.5 weeks (2020/21)
and 12.6 weeks (2021/22) during the pandemic, and is now returning to pre
pandemic levels (9.1 weeks in 2019/20).
Page 41 of 80

Page 42

commercial planning
application decisions (i.e., for
a business and industry).
Percentage of
premises able
to access
Superfast
Broadband
Digital infrastructure is one of
the key gateways to achieving
inclusive growth and
prosperity. By improving our
digital infrastructure, we will
connect North Lanarkshire to
markets and opportunities. 
NLC has a role alongside
telecoms companies in
facilitating and enabling the
development of effective
digital infrastructure. 
The required digital
infrastructure speed needed
to have superfast broadband
is 30Mbit/s.
97.0% 
Year:
2017/18
This measure will be used for benchmarking purposes only. 
2023 – North Lanarkshire – 98.4% / Scotland 92.0% 
North Lanarkshire has a higher % of premises able to access superfast
broadband compared to the Scottish average.
Carbon Dioxide
(CO2)
emissions area
wide per capita
(tonnes)
Sustainability is one of the key
principles which underpins
the ERDP. 
These estimates can assist us
in understanding our
environmental impact and can
be used to inform our actions
against climate change and
towards North Lanarkshire’s
target of achieving net zero
emissions by 2030.
5.92t per
capita 
Year:
2014/15
This measure will be used for benchmarking purposes only. 
2021/22 – North Lanarkshire 5.07 tCO2 / Scotland 5.10 tCO2
Page 42 of 80

Page 43

ERDP Performance Framework: Level 3
Day to day operations
Priority 1: Developing housing that promotes improved quality of life and creates a better place to live
Why is this set of indicators of interest? The Plan for North Lanarkshire
ambition statement alignment
This reflects the council’s commitment (through the Local Housing Strategy and Transforming Places
Programme of Work) to promote a supply of good quality affordable housing across all tenures. 
This also supports the Strategic Housing Investment Plan (SHIP) which helps deliver Local Housing
Strategy priorities and maximise resources in the Affordable Housing Supply Programme. 
The target to deliver 5,000 new homes by 2035, includes over 500 homes to be acquired through the
open market purchase scheme (an extension of the empty homes purchase scheme).
1. Ensure a housing mix that supports
social inclusion and economic growth. 
2. Refocus our town centres and
communities to be multifunctional
connected places which maximise social,
economic, and environmental
opportunities. 
Key
performance
indicator
What does
this tell us?
Baseline Note: These figures are cumulative and not additional to each other Lead
Team(s) By first ERDP
Review
(2022/23) 
Short-term Medium-
term
Long-term
By 31 March 2024 By 31
March
2025
By next
ERDP
Review
(2027/28)
By 31
March
2035
Actual Target Actual Target Target Target
Number of
new build
council
house
completions
The number
of new build
council
house
completions
via the
council’s
633 
Years:
2010/11 –
2018/19
1,016 1,292 1,351 
Green
1,619 2,300 3,600 New
Supply
Page 43 of 80

Page 44

New Supply
Programme
Number of
Open Market
Purchase
Scheme
completions
The number
of homes
brought into
council
ownership,
including
some homes
previously
sold under
the Right to
Buy,
133 
Years:
2010/11 –
2018/19
630 705 753 
Green
853 1,055 1,400 New
Supply
Household
connectivity
capacity
The % of new
build homes
(via the New
Supply
Programme)
with high
quality digital
infrastructure
79% 
Years:
2010/11 –
2018/19
87% 90% 90% 
Green
91% 94% 96% New
Supply 
ERDP Priority 1 Performance Summary:
Total number of indicators Number of indicators with
‘Green’ status
Number of indicators with
‘Amber’ status
Number of indicators with ‘Red’
status
3 3 0 0
Success to date The New Supply Programme was introduced in 2010/11 and NLC has set an ambitious target of delivering
5,000 council homes by 2035. This will be achieved via a combination of new build, purchasing from the
private sector (off the shelf) and buying existing homes via the Open Market Purchase Scheme: 
• 2,104 homes have been delivered via the New Supply Programme, at 31 March 2024.
Page 44 of 80

Page 45

• NLC’s first low carbon (net zero) homes were completed at Dykehead Road, Airdrie in 2022/23. These
homes feature air source heat pump heating systems, battery storage and enhanced photovoltaic
panels. 
• As part of our new council house building programme we maximise the delivery of community benefits.
These form part of our valuation process when we’re reviewing contracts for our new build projects and
these benefits are key to supporting communities, future workforce and local people.
• In 2023/24, a new amenity house opened in Castlehill Road, Wishaw for local residents to enjoy, meet
and socialise together. This is just one of the community benefits delivered as part of our New Supply
Programme.
• We’re also helping young people towards positive outcomes and work with education, supported
enterprise and employability teams to help facilitate work experience and opportunities to positive
destinations within construction. 
Challenges Various external factors such as the Covid‐19 pandemic, Brexit, the wider geopolitical environment, and
rising inflation across the UK economy have impacted construction and materials costs. 
Despite these challenges, the programme is progressing well and all 3 related ERDP Priority 1 Performance
Indicators were met or exceeded by 2023/24. 
Priority 2: Reshaping our town centres to ensure that they provide modern and attractive centres that meet the needs of our communities 
Why is this set of indicators of interest? The Plan for North Lanarkshire
ambition statement alignment
A key priority within the Transforming Places Programme of Work Delivery Plan is the regeneration of
North Lanarkshire’s town centres and their redevelopment as modern, high‐quality, mixed‐use
spaces with a much stronger focus on residential provision.
1. Ensure a housing mix that supports
social inclusion and economic growth. 
2. Refocus our town centres and
communities to be multifunctional
connected places which maximise social,
economic, and environmental
opportunities. 
Page 45 of 80

Page 46

Key
performance
indicator
What does
this tell us?
Baseline Note: These figures are cumulative and not additional to each other Lead
Team(s) By first
ERDP
Review
(2022/23) 
Short-term Medium-
term
Long-term
By 31 March 2024 By 31
March
2025
By next
ERDP
Review
(2027/28)
By 31
March
2035
Actual Target Actual Target Target Target
Investment
made in town
centre
developments
The amount
(£)
invested in
North
Lanarkshire’s
town centres
to enable
sites to be
repurposed
or
redeveloped.
This includes
NLC
investment
and external
funding
sources.
£29.8m 
Years:
2010/11 –
2018/19
£73.89m £96.2m £91.9m 
Amber
£114.5m £218.7m £289.2m Growth /
New
Supply
External
funding
secured for
town centre
regeneration
projects
The amount
(£) of external
funding
secured for
town centre
regeneration
projects in
North
£9.26m 
Years:
2010/11 –
2018/19
£32.0m  £44.8m £44.3m 
Amber
£54.7m £92.9m £120.4m Growth /
New
Supply
Page 46 of 80

Page 47

Lanarkshire’s
town centres.
Number of
town centre
buildings
and/or sites
repurposed or
redeveloped
The number
of existing
buildings or
vacant sites
within North
Lanarkshire’s
town centres,
which have
been
repurposed
or
redeveloped.
34 
Years: 
2010/11 –
2018/19
58 61 59 
Amber
64 85 91 Growth /
New
Supply /
RSL’s
Number of
new
affordable
homes
completed
within town
centres (or
edge of town)
The number
of units
either
converted to
residential or
new build
house
completions
by NLC or
RSLs within
town centres
887 
Years
2010/11 –
2018/19
1,663 1,728 1,692 
Amber
1,797 2,574 2,715 Growth /
New
Supply /
RSL’s 
Page 47 of 80

Page 48

ERDP Priority  2 Performance Summary:
Total number of indicators Number of indicators with
‘Green’ status
Number of indicators with
‘Amber’ status
Number of indicators with ‘Red’
status
4 0 4 0
Success to date Since the ERDP was introduced in 2019, eight town visions have been developed for Airdrie, Bellshill,
Coatbridge, Cumbernauld, Kilsyth, Motherwell, Shotts and Wishaw. 
Town Action Plans have been developed for Airdrie, Bellshill, Kilsyth, Motherwell, Shotts and Wishaw,
outlining the short, medium and long‐term actions required to realise the visions for each of these towns.
These will be reviewed annually. 
A Town Board has been established in Coatbridge. The board will drive the development of a Long-Term Plan
for Coatbridge, aligned to the Town Vision, which will be submitted to the UK Government during 2024/25.
This will act as a three-year investment plan towards drawing down the first tranche of funding from the £19.5
million allocated to Coatbridge over the next 10 years. 
The council acquired The Centre Cumbernauld in June 2023, a major milestone in the redevelopment of
Cumbernauld town centre. Proposals are now being developed for the phased redevelopment of the town
centre, including traffic/transportation assessments. 
Over £90 million has been invested in towns since the launch of the ERDP in 2019, with key projects
including: 
• The acquisition of key town centre properties, with plans to convert to residential developments. These
include the former YMCA building (Brandon Street, Motherwell), Motherwell Old Town Hall, Bank Street
and Main Street (Coatbridge), the former Masonic Hall (Hope Street, Motherwell), Kings House (Wishaw)
and the former Methodist Church (Wishaw).
• Enabling the regeneration of the Orrs building in Airdrie, which completed in 2024
• Major improvements to community facilities such as Motherwell Library.
• A 2.3km Green Route, connecting Cumbernauld town centre with surrounding communities such as
Kildrum and Carbrain. 
Page 48 of 80

Page 49

1,692 town centre homes have also been delivered via NLC and Registered Social Landlords (RSLs) as part of
the Strategic Housing Investment Plan (SHIP). This includes homes within a 10‐minute walk of town centres,
in line with the 20‐minute neighbourhood definition.
Challenges Various external factors such as the Covid‐19 pandemic, Brexit, the wider geopolitical environment, and
rising inflation across the UK economy have impacted construction and materials costs. 
Challenging public finances over the last few years have also put a recent strain on the availability of external
government funding towards capital projects, such as the recent pausing of the Scottish Government’s
Regeneration Capital Grant Fund (RCGF) and Vacant and Derelict Land Investment Programme (VDLIP), as
well as delays in confirming Place Based Investment Programme budgets for 2024/25. 
However, progress continues towards reshaping and repopulating our town centres. The council continues to
engage with property and landowners to acquire buildings/land which are strategically aligned with our
redevelopment plans. 
A key challenge is managing owner’s expectations around property/land value, ensuring best value is
achieved. 
Priority 3: Improve our business and industrial infrastructure, creating opportunity for investment and for companies to start-up or relocate
here 
Why is this set of indicators of interest? The Plan for North Lanarkshire
ambition statement alignment
Although North Lanarkshire has a significant amount of industrial land and premises, some are not
suitable for today’s needs. To enable our people and businesses to thrive we’ll invest in business and
industrial space and in marketing North Lanarkshire as the place to invest and work.
2. Refocus our town centres and
communities to be multifunctional
connected places which maximise social,
economic, and environmental
opportunities. 
3. Maximise the use of our marketable
land and assets through improved
Page 49 of 80

Page 50

development in business and industrial
infrastructure. 
16. Transform our natural environment to
support wellbeing and inward investment
and enhance it for current and future
generations. 
Key
performance
indicator
What does
this tell us?
Baseline Note: These figures are cumulative and not additional to each other Lead
Team(s) By first
ERDP
Review
(2022/23) 
Short-term Medium-
term
Long-term
By 31 March 2024 By 31
March
2025
By next
ERDP
Review
(2027/28)
By 31
March
2035
Actual Target Actual Target Target Target
Investment
made
towards the
development of
business and
industrial
infrastructure
The amount
(£) invested in
business and
industry
zoned land or
upgraded to
existing
business and
industrial
infrastructure
across North
Lanarkshire.
This includes
NLC and
ALEO funding
only.
£0.524m 
Year:
2018/19
£2.852m £4.19m £4.65m 
Green
£7.89m £9.2m £14.9m Fusion
Assets /
NLP /
Growth
Page 50 of 80

Page 51

External/private
sector/loan
funding
secured for
office and
industrial
development
The amount
(£) of external,
private or loan
funding
secured for
investment in
office and
industrial
developments
across North
Lanarkshire.
£1.3m 
Year:
2018/19
£16.85m £21.7m £22.35m 
Green
£27.35m  £32.8m £40.4m Fusion
Assets /
Growth
Ha of land
improved for
business and
industrial use
The amount
(Ha) of land
remediated or
improved for
business and
industry use
across North
Lanarkshire
3.61ha 
Year:
2018/19
7.74ha 9.5ha 10.29ha 
Green
14.26ha 15.0ha 16.0ha Fusion
Assets /
Growth
Sq.ft of
commercial
workspace
created or
refurbished
The amount
(square
footage) of
commercial
workspace
created or
refurbished
as a result of
investment by
NLC, Fusion
Assets or
North
Lanarkshire
Properties
18,000 sq.ft 
Year:
2018/19
117,410 sq.ft 132,910
sq.ft
132,910
sq.ft 
Green
160,658
sq.ft
258,358
sq.ft
459,858
sq.ft
Fusion
Assets /
NLP / 
Growth
Page 51 of 80

Page 52

across North
Lanarkshire 
ERDP Priority 3 Performance Summary:
Total number of indicators Number of indicators with
‘Green’ status
Number of indicators with
‘Amber’ status
Number of indicators with ‘Red’
status
4 4 0 0
Success to date Since the introduction of the ERDP in 2019, almost an additional 115,000 sq.ft of commercial workspace has
been created, including 40,500 sq.ft at Gartcosh Industrial Park (buildings 2 and 3). 
During 2023/24, Fusion Assets acquired Plot One at the former Ravenscraig steelworks site in Motherwell.
Following the remediation and servicing of the 6.4 acre development site, Fusion Assets will bring forward
plans for a multi let industrial scheme.  
Fusion Assets completed the construction of a new 15,500 sq.ft, net zero carbon enabled, industrial building
at Link Park, Newhouse during 2023/24.  
Enabling works were completed in June 2023 at Gartcosh Industrial Park (Phase 3). This site has planning
approval for the construction of up to four new industrial units, totalling 62,000 sq.ft. 
11,410 sq.ft has been developed at Spruce Court within Orbiston Street Industrial Estate, Motherwell. This
has provided new start‐up units for SMEs as well as a unit for New College Lanarkshire students as part of an
initiative to support young entrepreneurs who are setting up a business within the area. 
The council has also secured £1.9M from the Scottish Government’s Regeneration Capital Grant Fund which
will
contribute to the significant redevelopment of Braidhurst Industrial Estate in Motherwell. This project will see
the upgrading of the existing units owned by North Lanarkshire Properties as well as the construction of
industrial units suited to local small‐medium sized enterprises (SMEs). 
Page 52 of 80

Page 53

Lastly, the council continue to receive ring‐fenced Vacant and Derelict Land Fund (VDLF) funding from the
Scottish Government (subject to the submission and approval of an annual VDLF Local Delivery Plan) and
continue to focus this investment towards the creation of new industrial and business space and ultimately
new jobs. 
Challenges Various external factors such as the Covid‐19 pandemic, Brexit, the wider geopolitical environment, and
rising inflation across the UK economy have impacted construction and materials costs. 
High interest rates and lower investment yields have also impacted on the viability of externally funded
projects which Fusion Assets looks to deliver, either solely or as a joint venture. 
This has caused some delays to projects and investments made. Despite these challenges, good progress
has been made against improving our business and industrial infrastructure with all 4 key performance
measures under this ERDP priority either met or exceeded by March 2024. 
Priority 4: Continuing to improve our connectivity and develop new opportunities to transform our road, rail and digital infrastructure
Why is this set of indicators of interest? The Plan for North Lanarkshire
ambition statement alignment
Another key priority within the Transforming Places Programme of Work is the delivery of the City Deal
Infrastructure programme which aims to increase Gross Value Added across the entire Glasgow City
Region by providing increased access to jobs through improved connectivity to centres of
employment and opening up development opportunity. 
We will connect North Lanarkshire to markets and opportunities by improving our strategic
infrastructure.
2. Refocus our town centres and
communities to be multifunctional
connected places which maximise social,
economic, and environmental
opportunities. 
4. Market and promote North Lanarkshire
as the place to live, learn, work, invest,
and visit. 
5. Grow and improve the sustainability
and diversity of North Lanarkshire’s
economy 
Page 53 of 80

Page 54

16. Transform our natural environment to
support wellbeing and inward investment
and enhance it for current and future
generations. 
Key
performance
indicator
What does
this tell us?
Baseline Note: These figures are cumulative and not additional to each other Lead Team(s)
By first
ERDP
Review
(2022/23) 
Short-term Medium-
term
Long-term
By 31 March 2024 By 31
March
2025
By next
ERDP
Review
(2027/28)
By 31
March
2035
Actual Target Actual Target Target Target
Investment
made in key
infrastructure
projects
(including
City Deal
projects) to
date
The amount
(£) invested
in key
infrastructure
projects
(including
investment
made in City
Deal projects
to date). 
This includes
NLC direct
investment
and Glasgow
City Region
City Deal
funding.
£6.8m 
Years:
2015/16 –
2018/19
£42.34m £64.4m £55.16m 
Red
£68.12m £154.44m £243.45m City Deal
Page 54 of 80

Page 55

Number of
key
infrastructure
contracts
completed
The number
of key
Enterprise
Projects or
City Deal
infrastructure
contracts
completed. 
A long‐term
project can
contain
multiple
contracts
3  
Years:
2015/16 –
2018/19
7 11 13 
Green
17 25 28 City Deal
Km of active
travel routes
The amount
(Km) of active
travel routes
created
which
will improve
the ability of
all people to
walk, wheel
and cycle
throughout
North
Lanarkshire. 
This will help
reduce
inequalities
by providing
people with
0km 
Year:
2018/19
13.46km 19.46km 17.2km 
Amber
21.8km 50km 125km Infrastructure
&
Transportation
Page 55 of 80

Page 56

more
opportunities
to access
employment,
local
services,
education or
training. 
ERDP Priority 4 Performance Summary:
Total number of indicators Number of indicators with
‘Green’ status
Number of indicators with
‘Amber’ status
Number of indicators with ‘Red’
status
3 1 1 1
Success to date The direct deliverable successes to March 2024 relate to infrastructure delivery completed or in progress;
procurement activity progressed and contracts awarded; project development and delivery investment. 
The indirect deliverable successes to March 2024 relate to economic benefits realised; the impact of GCR
City Deal investment in addressing market failure and providing improved confidence to the market, people
and businesses to locate in North Lanarkshire. These successes are monitored through ongoing benefits
monitoring data and through evidence of market interest (through planning applications, proposal of
application notices, commercial enquiries). 
The following headline successes has been achieved since the commencement of the council’s City Deal
Infrastructure Investment Programme: 
• £55.16m City Deal Programme investment to March 2024 (project development and delivery)
• A further £1.15m of external funding secured and invested in other infrastructure projects to March 2024
to support core City Deal projects.
• 13  infrastructure contracts delivered (City Deal contracts and other infrastructure contracts to support
core City Deal projects). 
Page 56 of 80

Page 57

Gartcosh/Glenboig Community Growth Area (CGA):
• Gartcosh Business Park to Glenboig Link Road project delivered (comprising three works contracts).
• Benefits realisation has commenced as a result of the Glenboig Link Road project with housing
developments at Gartcosh/Glenboig CGA and Fusion Assets investment in commercial/industrial units
at Gartcosh Business Park. There has also been evidence of market interest (both residential and
commercial) in the area. 
Motherwell Town Centre Transport Interchange : 
• Motherwell Station Park and Ride expansion project delivered.
• Muir Street Interchange works completed in May 2023. 
Ravenscraig Infrastructure Access (RIA) South: 
• West Coast Mainline Crossing guided into place under a closure of the rail line in April 2023. 
East Airdrie Link Road (EALR) 
• Tender for consultancy services for stage 3 of the project issued, evaluated and contract awarded.
Outline Business Case developed, for submission in Summer 2024. 
A8/M8 Corridor Access Improvements: 
• Options appraisal and concept design work progressed for Phase 1 and 2 of Eurocentral Strategic Active
Travel Links project. Tender for consultancy services for design and tender information prepared for issue
in June 2024. 
Active Travel
• Motherwell Station Active Travel Links Phase 1 (West Hamilton Street to Motherwell Civic Centre; Hope
Street, Muir Street and Pollock Street) detailed designs progressed and a contract awarded for works on
West Hamilton Street.
• Ravenscraig Active Travel Link Phase 2 works completed; feasibility study and options appraisal contract
awarded for active travel links between Courington Road, Motherwell and Ravenscraig Regional Sports
Facility.
• Alexander Street, Wishaw, Active Travel and Road Safety Improvements: construction completed.
• Meadowhead, Wishaw, Active Travel and Road Safety Improvements: construction completed.
Page 57 of 80

Page 58

• Glasgow Road, Wishaw, Active Travel and Road Safety Improvements: detailed design finalised and
Phase 1 constructed.
• Carnbroe Community Hub, Active Travel Links: detailed designs finalised and construction completed. 
Challenges Over the last 4 years in particular, a variety of external factors and challenges have affected construction and
infrastructure activity which have impacted on project programmes and milestones: 
Various external factors such as the Covid‐19 pandemic, Brexit, the wider geopolitical environment and rising
inflation across the UK economy have impacted construction and materials costs. Labour market and
material supply issues have continued to impact on tender costs and put pressure on delivery timescales. 
Ravenscraig Infrastructure Access South – due to identified drainage design issues within the Motherwell to
Ravenscraig works tender package, the decision was made not to continue with the works tender to the
planned programme. This impacted upon the projected spend profile for the RIAS project in 23/24. A revised
procurement strategy for development of the new road between Windmillhill Street and the Ravenscraig
Regional Sports Facility is now being taken forward as a series of smaller, related work phases. Spend
profiles for future years will be based on this revised strategy.  
East Airdrie Link Road – the procurement programme for appointment of consultancy services to progress
preliminary design and statutory approval services for the East Airdrie Link Road project was longer than
originally anticipated and impact the projected spend profile in 2023/24.  The contract has now been
awarded and spend profiles for future years will be updated. 
Active Travel infrastructure – the council is continuing to progress strategic Active travel projects in
accordance with the priorities identified in its Active Travel Strategy, including improving active travel
connections to new Community Hubs.  However, progress with delivering new/improved routes is largely
dependent on availability of external funding with allocations generally made on an annual basis which
makes forward planning more challenging. 
Page 58 of 80

Page 59

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    LN/PH Date 30/08/24 
City Deal Programme Update 
From  Pamela Humphries, Chief Officer (Place)  
E-mail NobleLy@northlan.gov.uk Telephone Lyndsay Noble
07970016256 
Executive Summary 
The North Lanarkshire City Deal Programme Update Report seeks to inform the Enterprise
and Fair Work Committee of the current status of North Lanarkshire City Deal Infrastructure
Programme and its subprojects.     
The report provides Committee with an update on the approved changes to the City Deal
Programme. The report also advises Committee of the submission and approval of the
East Airdrie Link Road Outline Business Case by the Glasgow City Region Cabinet.   
Recommendations
It is recommended that the Committee: 
(1) Acknowledges the status and recent progress of North Lanarkshire City Deal
infrastructure subprojects and revised Programme. 
(2) Acknowledges the Glasgow City Region Approval on 6 August 2024 to remove the
Ravenscraig North sub project from the City Deal Programme (dualling of A723) and
reprofile the Airbles Road Improvements sub project to 2028 and 2029.  
(3) Acknowledges the approval of the East Airdrie Link Road Outline Business Case. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (5) Grow and improve the sustainability and diversity of North
Lanarkshire's economy
Programme of Work Transforming Places
Item 4
Page 59 of 80

Page 60

1. Background 
1.1 The Glasgow City Region (GCR) City Deal is an agreement between the UK and
Scottish Governments and the eight GCR Local Authorities, with the sole focus of
creating additional economic growth. The 20-year GCR Deal was accepted by GCR
Council Leaders on 20 August 2014 and incorporated: 
• Implementing a £1.13bn Infrastructure Fund to improve the regional transport
network, regenerate sites for economic use and improve public transport
provision;
• Supporting growth in the life sciences sector;
• Helping small and medium enterprises to grow and develop;
• Establishing programmes to support the unemployed; and 
• Piloting new ways of boosting the incomes of low wage employees. 
1.2 As Committee is aware, a strategic review and prioritisation of all projects within the NL
City Deal programme has been carried out and formed part of the consideration of the
council’s Strategic Capital Investment Programme 2024/25 to 2028/29 approved by
Policy & Resources Committee on 14 March 2024. 
1.3 The review of City Deal Programme was to ensure the Programme remained fit for
purpose and aligned to the Plan for NL and Programmes of Work and to manage project
delivery and, importantly, to assess cost pressures on the projects. The impacts on
inflation, suppliers and materials and risk uncertainties resulting from a combination of
Brexit, Covid, and the Ukraine war has all led to a significant increased pressure on
infrastructure projects.  The revised programme now allows for a stronger focus on
strategic connectivity, and new road infrastructure to enable regeneration and
development. 
1.4 Following Committee approval in May 2024 for the proposed changes to the City Deal
Programme, it can now be confirmed that on 6 August 2024 the Glasgow City Region
Cabinet also approved the changes to allow the NLC Programme to be reset and
refocused. 
1.5 The City Deal Programme for North Lanarkshire, as part of the infrastructure fund,
following the removal of the Ravenscraig North sub project comprises the following sub
projects:
• A8/M8 Corridor Access Improvements
o Strategic Active Travel 
o Orchard farm Roundabout
• Glenboig Link Road (complete)
• Pan-Lan Orbital Transport Corridor
o East Airdrie Link Road
o Ravenscraig Access Infrastructure South (Motherwell to Ravenscraig
and Airbles Road Improvements)
o Motherwell Town Centre Transport Interchange (complete) 
1.6 As Committee is aware, the strategic review and prioritisation of all projects within the
City Deal programme formed part of the consideration of the council’s Strategic Capital
Investment Programme 2024/25 to 2028/29 approved by Policy & Resources
Committee on 14 March 2024.    
Page 60 of 80

Page 61

2. Report 
City Deal Programme 
2.1 The Programme has been revised as outlined above and focuses on creating the Pan
Lanarkshire Transport Corridor and improving the A8/M8 Corridor Improvements
supporting both the city deal objectives and the Plan for North Lanarkshire. 
2.2 Following approval of the new five-year capital programme (March 24), Enterprise and
Fair Work Committee approval (May 24) and Glasgow City Region Cabinet approval
(August 24) to amend the Programme, the RIA North sub project has been removed
from the City Deal Funding Programme. As part of the revised Programme, the Airbles
Road Improvements have also been reprofiled with works now planned during February
2028 to March 2029. 
2.3 As previously reported, this now allows the RAI North funding allocation of the City Deal
grant to be reallocated to further support the remaining Pan Lanarkshire Corridor sub
projects and for the significant committed NLC additional contributions from RAI North
(in the region of £50m) to be re-profiled over existing City Deal projects. This enables
the council to prioritise resources on the new sections of road and potentially further
consider active travel provision along the A723 to create the Pan Lanarkshire Transport
Corridor supporting vehicle movement, public transport and active travel. 
Project Updates 
2.4 East Airdrie Link Road 
As Committee is aware, the East Airdrie Link Road (EALR) will provide a new strategic
link between the M8 and south Cumbernauld.  The proposed link road will also provide
the access to the Replacement Monklands Hospital at Wester Moffat, Airdrie. The
Monklands Replacement Project is moving forward at present with the Scottish
Government approving the Monklands Replacement Project (MRP) Outline Business
Case in July 2023.  A further key milestone has also been achieved by NHS Lanarkshire
with Planning Permission being granted for the Replacement Hospital on 20 June 2024.
NHS Lanarkshire have appointed Laing O’Rourke as their preferred contractor who will
work alongside their design team to progress the project to Full Business Case. 
2.5 The EALR project team continue to liaise with NHS Lanarkshire through regular
technical meetings and a Project Interface Board provides governance around
coordination, manage risk, secure efficiencies, and maximise benefits. 
2.6 With the EALR project now firmly in DMRB Stage 3 (preliminary design and planning),
the agreed previously reported programme is progressing at pace with design fix one
complete and design fix two almost complete. These design phases will allow the
alignment to be confirmed and will support further consultation with key stakeholders
including local communities and residents. To support the design work and planning
application, topographical surveys and environmental surveys are underway.  The
Project team have commenced consultation with key landowners, affected residents
and the wider community. 
2.7 As committee is aware, an Outline Business Case was required to be submitted to the
GCR Cabinet to secure approval to move forward with the EALR project to Full
Business Case and to release the next tranche of City Deal Funding. The OBC has
now been approved by the GCR Cabinet on the 6 August 2024, meeting a major
funding milestone for the EALR.  
Page 61 of 80

Page 62

2.8 The approved EALR OBC reflects the increased estimated budget previously reported
of £185M. The OBC is based on the agreed delivery timescales with the EALR
completion by 2030. The business case focuses on the link road being critical to both
the Pan Lanarkshire Orbital Transport Corridor and for the opening and operation of
the Monklands Replacement Hospital.   
Motherwell Town Centre Transport Interchange 
2.9 The Motherwell Town Centre Transport Interchange project, comprising Motherwell
Station and Muir Street improvements, is complete. The Station has undergone
transformational change with the improvements providing a high-quality experience for
rail passengers and railway employees at Motherwell. 
2.10 The Partnership between Scotrail, NLC, SPT and Transport Scotland in delivering the
joint project has been a success and is now driving forward related active travel projects
to connect Motherwell Rail Station and surrounding communities to leisure facilities,
employment and training opportunities at Strathclyde Country Park, Braidhurst
Industrial Estate, Ravenscraig and local services in Motherwell. 
2.11 Whilst the Muir Street contract works are complete and the new facilities are now open
and in use, defects remain which require to be rectified by the contractor on sections
of the public realm and surfaced areas of Muir Street. Discussions continue with the
contractor and once the timing and duration of the rectification works has been agreed
this will be communicated to local members, stakeholders, local businesses and
residents. 
Ravenscraig Access Infrastructure 
2.12 The Ravenscraig Access Infrastructure project, following the removal of the RIA N sub
project, comprises 2 sub projects: 
• A new road connection between Motherwell and Ravenscraig from Airbles Road,
passing under the West Coast Main Line railway, and on to the Regional Sports
Facility 
• Completing the dualling of Airbles Road between Airbles Farm Road and Hamilton
Road and improving facilities for pedestrians and cyclists.   
2.13 A revised procurement strategy for the development of the new road between
Windmillhill Street and the Ravenscraig Sports Facility is now being taken forward as a
series of related work phases. The first phase of work comprises the demolition of the
buildings acquired for the scheme – at Manse Road (formerly Cook & Indi’s and Yesss
Electrical), the existing Evans Halshaw dealership and the adjacent vacant commercial
unit. The demolition contract is progressing with the works taking place from late
summer 2024. 
2.14 The advancement of the works through a series of packages including the demolition
contract, subsequent proposed groundworks and advanced utilities works will assist in
maintaining progress, minimising the impact on Motherwell Town Centre and local road
network and will de-risk the main works contract. 
2.15 The phasing of the works packages also allows further consideration of a wider
strategic and local drainage strategy to potentially help support further works to improve
the drainage network in the vicinity, which is significantly constrained and may inhibit
Page 62 of 80

Page 63

future redevelopment and regeneration of council and other sites.  It also allows the
potential to link in with proposed road improvements being considered by the Roads
Authority and supporting the delivery of the Active Travel Strategy 
2.16 Design work will continue for the Airbles Road Improvement sub project with the
delivery of the works now programmed for February 2028 to March 2029 as per the
approval at the May Committee. 
2.17 For Ravenscraig North, as outlined earlier in this report, the RAI N sub project has now
been removed from the City Deal Programme. We are currently bringing the design
work to a sensible staged conclusion over 2024/25.  If required in the future, it will be
submitted as part of a future capital programme bid and considered within the long-
term financial planning of the council. 
Orchard Farm Roundabout 
2.18 The ‘A8/M8 Corridor Access Improvements’ Outline Business Case (OBC) including
the Orchard Farm Roundabout was approved by the GCR Cabinet on 30 August 2022.
The scope of the Orchard Farm Roundabout project comprises a financial contribution
of £2m to the developer for the construction of the junction on the A8. The Orchard
Farm Roundabout is a new junction on the A8 All Purpose Distributor Road and critically
supports the development of the Mossend International Rail Freight Park (MIRP) and
provides important access to a number of development sites to the north of the A8/M8. 
2.19 The proposed Full Business Case (FBC) to secure the city deal funding for the new
junction will be underpinned by a funding agreement between the council and the
developer/s and will establish funding arrangements, obligations and key milestones.
The remainder of the costs and any associated delivery risks relating to the delivery of
the infrastructure will be met by the developer/s.  The infrastructure will form part of the
strategic road network and will fall under the responsibility of Transport Scotland. 
2.20 Discussions are continuing with the private sector partnership responsible for delivering
the new roundabout infrastructure on programme; procurement approach; costs and
funding package. Value engineering opportunities have been identified which will
provide increased delivery certainty. These are being developed by the partnership’s
consultants for further discussion with Transport Scotland and other key stakeholders.
This will impact upon the target date of October 2024 for submission of the FBC for
approval to the GCR Chief Executive’s Group however will provide increased certainty
of delivery within budget. A programme change control has been approved by the GCR
Cabinet move the FBC submission from October 24 to Summer 2026. Discussions will
continue with the private sector partnership over the coming months on the revised
programme milestones. The FBC, once submitted, will report on the procurement
outcome of the new junction and associated works and is the final stage in the funding
approvals to allow for contract award and the delivery of the infrastructure. 
2.21 Agreement will be sought from Committee to submit the FBC to the GCR Chief
Executives Group for approval in due course.   
A8/M8 Corridor Strategic Active Travel 
2.22 The provision of 10 km of Strategic Active Travel Links, connecting Eurocentral/Maxim
Office Park/Newhouse and Mossend to surrounding local communities and local rail
stations was approved by GCR Cabinet on 30 August 2022 as the new preferred option
for the Eurocentral sub-project. 
Page 63 of 80

Page 64

2.23 The routes identified are to the south of Eurocentral between Bellshill Rail Station/town
centre and the M8 cycle route at North Road; Bellshill town centre, Mossend and
Holytown, connecting into Eurocentral from Holytown and between Holytown and
Newhouse. To the north of Eurocentral, a route has also been identified from Whifflet
rail station to the M8 cycle route at Shawhead. These routes are designated as
Strategic Network Routes within the North Lanarkshire Active Travel Strategy. 
2.24 The proposed shared use walking and cycling routes will be delivered by both City Deal
investment and other external funding. The routes link with other planned active travel
route improvements as part of the East Airdrie Link Road project and with other projects
being developed by the Infrastructure and Transportation team. 
2.25 Due to the scale of the project, a phased approach will be taken to design and delivery.
Detailed design work will be progressed over 2024 and early 2025, and subject to
Committee agreement, it is proposed to submit a first phase sub-project’s Full Business
Case in Summer 2025 and commence construction soon after, with completion of the
first phase in Autumn 2026. 
3. Measures of success 
3.1 The North Lanarkshire City Deal Programme construction timescales have been
updated following a programme review and approval of the Strategic Capital
Investment Programme are as follows (construction only): 
Glenboig/Gartcosh Community Growth Area: 
• Glenboig Link Road – May 2017 to June 2018 (complete) 
Pan Lanarkshire Orbital Transport Corridor: 
• Muir Street – January 2022 to June 2023 (complete) 
• Ravenscraig Access Infrastructure – March 2022 to March 2029 (no longer
including RAI N but including the reprofiling of Airbles Road) 
• East Airdrie Link Road – Sept 2028 to Sept 2030 
A8/M8 Transport Corridor: 
• Orchard Farm Roundabout – October 2026 to October 2027  
• Eurocentral Strategic Active Travel – June 2025 – March 2027 (delivered in
phases) 
3.2 The Programme and its sub projects have been developed to ensure that at a North
Lanarkshire level, North Lanarkshire’s residents and businesses will directly benefit.  
3.3 Each project at Outline Business Case stage and at sub-project at Full Business Case
stage has to demonstrate how it will deliver the direct and indirect benefits. As part of
the business case process, through the Economic Impact Assessment, outputs and
wider benefits are identified and are set out in a Benefits Realisation Profile. The
Business Cases identify the economic impacts and the Benefits Profile quantify and
details when outputs will be delivered and achieved as a result of the specific project
investment.  
Page 64 of 80

Page 65

3.4 The benefits will be measured over a 10-year period, reporting as part of the GCR
Gateways until 2035 and beyond. The City Deal Programme is currently in Gateway 2,
with the outcome to be presented to the Scottish Government and UK Government in
October 2024. A successful Gateway allows for the next 5 year tranche of funding to
be released. 
3.5 All North Lanarkshire City Deal contracts seek to maximise community benefits from
contracts awarded for the Project. Community Benefits will be secured for both sub-
projects comprising the Project, through the procurement of services and works in line
with the City Deal Community Benefit Strategy. The Community Benefits will be
delivered through the design, planning and implementation phases, through contracts
directly awarded by North Lanarkshire Council and where relevant its partners. The
community benefits menu within the City Deal Community Benefits Strategy will be
used to target benefits that support the Council’s key aims and objectives and deliver
against priorities. 
3.6 The type and number of community benefits to be delivered at a project and contract
level will be determined with reference to the nature and duration of each contract and
supplier. Community benefit outcomes for the Project will be linked to the Council’s
Single Outcome Agreement and Corporate Outcomes and the relevant local outcomes
which underpin these at a Service level. Community Benefits can be reported as part
of the sub projects updates. 
4. Supporting documentation 
4.1  No Supporting Documents. 
Pamela Humphries 
Chief Officer (Place) 
Page 65 of 80

Page 66

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The City Deal Cabinet has agreed that Inclusive Growth is to be fully embedded
within the GCR City Deal programme delivery and that it is also committed to
supporting the delivery of the Fairer Scotland Action Plan.  Future NLC subproject
OBC/FBC development will be scrutinised to ensure it meets the duties of the
Fairer Scotland Action Plan. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Following Committee approval (May 24) and GCR Cabinet Approval on 6 August
2024, the revised North Lanarkshire Glasgow City Region City Deal Programme is
as follows: 
• A8/M8 Corridor Access Improvements £6.5m
• Glenboig Link Road (complete)  £6.2m
• Pan-Lan Orbital Transport Corridor  £264.9m
• Total                                                              £277.6m 
This is funded £149.0m by the GCR City Deal Infrastructure Fund and £128.6m by
North Lanarkshire Council. 
The financial implications of the City Deal Programme will be considered within the
council’s Long-term Financial Plan. To date budgetary implications over the next 5
years have been approved by the Policy and Strategy Committee. 
Page 66 of 80

Page 67

5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The City Deal Team work closely with Legal Services on all sub projects focusing
on land acquisition and CPO, procurement and contract preparation and
management, funding agreements and any other related matters. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
All infrastructure projects developed by the council as part of the GCR City Deal will
be subject to relevant environmental and sustainability appraisal and as part of the
design process and subsequent planning application approvals and procurement.   
Page 67 of 80

Page 68

Furthermore, to adhere with HM Treasury Greenbook best practice, each iteration of
project business case seeking GCR City Deal funding will include a review of the
sustainability considerations, this will include carbon management, involving
categorisation, assessment and mitigation. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The City Deal programme and the delivery of the projects will continue to be
promoted through Corporate Communications and the Glasgow City Region’s
Communications team.   
Specific to Muir Street Improvements, a joint communications group with Scotrail,
Transport Scotland and North Lanarkshire Council has been set up to coordinate
communication and promote the Motherwell Station redevelopment and the City
Deal Muir Street improvements.   
In terms of East Airdrie Link Road, a joint communication plan will be developed
with NHS Lanarkshire and North Lanarkshire Council to coordinate communication,
stakeholder engagement and promote the projects as they develop.   
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
A key risk for the City Deal Programme is the current global economic climate and
its short and long term impacts on the delivery of the city deal projects.  This risk is
becoming a live issue for the Programme and will be assessed and recorded within
the City Deal Issues Register. This is not unique to City Deal and the approach to
this risk and issue management will be carried out in conjunction with Finance and
the Glasgow City Region Project Management Office.   
Risk management of North Lanarkshire’s City Deal activity is incorporated within
the council’s City Deal programme risk register which is reviewed by the City Deal
Manager and reported to the council’s City Deal Board.  The City Deal risks are
also integrated in the Planning and Regeneration Service Risk Register.  Each City
Deal sub project has a detail risk register and is managed by the Project Manager. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 68 of 80

Page 69

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 69 of 80

Page 70

Page 70 of 80

Page 71

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  AG/PK Date 30/08/24 
Re-appointment of Category B Directors - Routes to Work Ltd 
From  Alison Gordon, Chief Social Work Officer (Education, Families, Justice &
Integrated Practice)  
E-mail gordonal@northlan.gov.uk Telephone   01698 332001 
1. Background 
1.1 Routes to Work’s Board of Directors consists of up to twelve members – two are
Category A members appointed by North Lanarkshire Council (one is an elected
member, and one is a senior council officer) and up to ten Category B directors, who
bring specialist expertise to the company and are selected through a formal nomination
procedure. 
1.2 The Board of Directors is responsible for ensuring that Routes to Work’s services are
delivered in accordance with approved Service Level Agreements and charitable
objectives. The Board meets quarterly to fulfil its governance responsibilities which
include operational delivery and management, staffing, financial control and reporting,
health and safety, risk management and performance monitoring and reporting. There
Executive Summary 
This report concerns the re-appointment of four Category B directors to Routes to Work
Limited (RTW) who are reaching the three-year limit on their appointment by the Council
and are willing to be re-appointed. 
Recommendations
It is recommended that the Enterprise & Fair Work Committee: 
(1) Approve the re-appointment of the four Category B directors, referred to in section
2.3, to the Board of Directors of Routes to Work Limited. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement
(11) Increase economic opportunities for adults by understanding,
identifying, and addressing the causes of poverty and deprivation
and barriers to financial inclusion
Programme of Work Brighter Futures 
Item 5
Page 71 of 80

Page 72

are three formal sub-groups of the Board that meet regularly.  These have remits for
Governance, Human Resources, and Finance. 
2. Report
Provisions of Articles of Association
2.1 The Articles of Association of Routes to Work Limited include the following provisions
in respect of the composition of the Board of Directors and the appointment of
Independent Directors: 
60.2 a maximum of 10 directors shall be Category B Directors, who shall be
appointed (after due consideration of the views of the board of directors) on the basis
that: 
60.2.1 they are representative of the community within the local authority area of the
Council; and/or
60.2.2 they have specialist skills or expertise which would be of assistance to the board.
2.2 Under the terms of Article 65.1 the Council may appoint/ re-appoint any Category B
Director (other than an officer, elected member or employee of the Council) in writing
and signed by an appropriate officer with the guidance of the company’s nominations
sub-committee.  The appointment/ re-appointment of Category B directors is for a
period of 3 years, after which directors must resign or be re-appointed by the Council. 
In addition, the Council can remove any Category A or B director from office at any
time. 
2.3 The re-appointment of the four Category B Directors listed below has been discussed
and agreed at Routes to Work Ltd Board and it was agreed that the Council be
approached to secure the necessary approval for these re-appointments. The directors
seeking re- appointment are: 
(i) Robert King
(ii) Liz McCutcheon
(iii) Martin McGuire
(iv) Kenny Nicholson 
2.4 The independent directors proposed for re-appointment have clear expertise within
areas that can support Routes to Work Ltd. A short profile of the independent directors
proposed for re-appointment is included in Appendix 1. 
3. Measures of success 
3.1 Routes to Work Limited continues to utilise the experience and support of its
independent directors. 
Page 72 of 80

Page 73

4. Supporting documentation 
4.1 Appendix 1 Profile of Category B Director Proposed for Re-appointment to Routes to
Work Limited Board. 
Alison Gordon
Chief Social Work Officer (Education, Families, Justice & Integrated Practice) 
Page 73 of 80

Page 74

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty   
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
The financial performance of Routes to Work is closely monitored by the council’s
Section 95 Officer and the financial performance as detailed above, along with
other key financial information presented in the report. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Page 74 of 80

Page 75

Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Routes to Work maintain a detailed risk register which is presented to each Board
meeting.  In terms of the Council, the risk of Routes to Work and the wider
employability programmes being deemed non-compliant with external funders is
present and controlled through the strong monitoring arrangements and reflected in
Council risk registers.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒ 
Page 75 of 80

Page 76

APPENDIX 1
Profile of Category B Directors Proposed for Re-appointment to Routes to Work
Limited Board:
1. Robert King, Clyde & Co.
Robert King, Clyde & Co.Robert is a consultant with Clyde and Co, an international law firm,
and is qualified in both Scottish & English law. He was accredited by the Law Society of
Scotland as a Specialist in Employment Law in 2009 and as a Specialist in Discrimination
Law in 2015. In addition to employment law, Robert is also experienced in the professional
regulatory field and in 2021 the Scottish Social Services Council appointed him as a Legally
Qualified Chair on its Fitness to Practise panels.  Robert is the Chair of the Routes to Work
Board of Directors and also sits on the Routes to Work HR sub-committee to which he brings
knowledge and experience of employment law and HR related issues.  
2. Liz McCutcheon, Inspirent Ltd.
As the Chief Executive of Inspirent Ltd, a third sector organisation, Liz provides strategic
direction for Inspirent’s activities, the predominant activity being the provision of economic
development support for Small to Medium Enterprises across Scotland. Specifically, their
purpose is to support SMEs and their leaders to start up and grow their businesses, to provide
high-quality, well-paid employment so that individuals and communities' flourish. A key
channel of Inspirent’s purpose is the delivery of a range of business startup and growth
support as well as fund management services to support digital transformation on behalf of
the public sector and the Scottish Government. This includes a range of business support via
Business Gateway across several local authorities’ areas and Just Enterprise for the third
sector.  Liz has over 20 years of experience gained at a strategic level, operating in economic
development and as a director in the private sector and sits on the main board of Routes to
Work as well as the Governance sub-committee.
3. Martin McGuire, WorldSkills UK
Martin is the former Director Scotland of WorldSkills UK and held responsibility for working
with Skills bodies, the tertiary education sector, the business community and other
stakeholders to harness the impact of international skills development to help deliver more
world-class outcomes across the Scottish skills system.  Martin has extensive experience in
senior management roles in Further Education having previously held the role of Principal at
Cumbernauld college, New College Lanarkshire and Adam Smith College in Fife.  A
Chartered Physicist, having initially lectured in electronic engineering, he is a strong advocate
of skills enhancement and STEM participation. Martin is the Vice Chair of the RTW Board of
Directors, and he also sits on the Routes to Work HR sub-committee. 
4. Kenny Nicholson, Alzheimer Scotland. 
Kenny Nicholson is Executive Lead for People, Wellbeing & Facilities with Alzheimer
Scotland, Scotland’s leading dementia charity. He has over 30 years' experience in human
resources management in various positions in local government, housing and private
enterprise and is a Fellow of the Chartered Institute of Personnel & Development. Kenny is
extremely proud to have been Trustee of Routes to Work for the past 14 years and is Chair
of the HR Sub-Committee to which he brings his knowledge and experience of HR and
employment, as well as his strong interest in wellbeing, equality and diversity related issues.
Page 76 of 80

Page 77

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    JMcK/CPT Date 30/08/24 
Contracts awarded below Committee approval threshold 
From  James McKinstry, Chief Officer (Assets and Procurement)  
E-mail McKinstryJ@northlan.gov.uk  Telephone 07939 281 102 
Executive Summary
In accordance with the Council’s General Contract Standing Orders (“GCSOs”), GCSO
21.10 requires a summary report be presented to members with details of contracts
awarded since last committee, specifically for the spend range: 
• over £50,000 but below £500,000 for supplies or services; and,
• over £500,000 but below £2,000,000 for works. 
Recommendations
It is recommended that the Enterprise and Fair Work Committee: 
(1) Acknowledge the contract awards made since last committee reporting cycle.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Transforming Places
Item 6
Page 77 of 80

Page 78

1. Background 
1.1 The Local Government (Scotland) Act 1973 section 81 requires local authorities to
“…make standing orders with respect to the making by them or on their behalf of
contracts for the supply of goods or materials or for the execution of works.”. 
1.2 The Council’s General Contract Standing Orders (“GCSOs”) set out the council’s
specific procurement procedures and responsibilities at all spend levels, and include
the reporting requirements of procurement activity, including contracts awards, to
committee for either approval or acknowledgement. 
2. Report 
2.1 In accordance with GCSO 21.10, this report summarises the contract awards since last
committee, specifically for the spend range: 
• over £50,000 but below £500,000 for supplies or services; and,
• over £500,000 but below £2,000,000 for works. 
2.2 If you require further information regards the contract awards reported, please refer to
the lead service area / Chief Officer detailed in the appendix. 
3. Measures of success 
3.1 All requirements contracted contribute to either the council’s programme of work and/or
fulfil a statutory requirement. 
3.2 All contract awards secure best value for the council in accordance with their evaluation
criteria. 
3.3 All necessary diligence has been undertaken in the evaluation and appointment of
contractors. 
3.4 All contract awards are logged in the council’s contract register. 
4. Supporting documentation 
4.1 Appendix 1    Summary of contracts awarded. 
James McKinstry
Chief Officer (Assets and Procurement) 
5. Impacts 
5.1 Impacts considered as part of the contract award procedures are recorded in the
individual contract award reports held by the lead service area.  
Page 78 of 80

Page 79

Summary of Contracts Awarded                      Appendix 1 
Contract Ref NLC-CPT-23-129
Title Cumbernauld Town Centre Client Interface 2024 - 2025
Classification Services
Lead Service Area / Chief Officer Pamela Humphries, Chief Officer (Place)      
Competition Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on 3rd party frameworks
Procurement Route Call-off following Direct Award using Third Party Framework
No. of Framework Contractors 19
Award Criteria Best Value assessment, in accordance with the Framework Information
Comments This Direct Award was made from the Crown Commercial Services (“CCS”) Estate Management
Services (RM6168) framework agreement, Lot 1 – Total Estate Management.     
Award
Details
Value £100,000
Contract Duration Initial 12 months with option to extend by a further 6 months
Contractor Name Avison Young (UK) Limited
Contractor Size Large Company
Contractor Location West Midlands
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? Yes      
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer Scotland
Duty ☐
HR Policy Impact ☐ Data Protection Impact ☐ Environment / Carbon
Impact ☐
Risk Impact ☒ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☐
Communications Impact
☐
Armed Forces Covenant
Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer       
Page 79 of 80

Page 80

Page 80 of 80