Democracy Spraffa

Agenda Document Pack - Enterprise and Fair Work Committee - 16/02/2024

North Lanarkshire Council · 16 February 2024
Back to Enterprise and Fair Work Committee — 16 February 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

6 February 2024 
Members of the 
Enterprise and Fair Work Committee
Chief Executive’s Office
Archie Aitken
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk 
Notice is given that a Meeting of the Enterprise and Fair Work Committee is to be held in
the Council Chamber, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on Friday, 16
February 2024 at 10:00 AM which you are requested to attend. 
The agenda of business is attached. 
Archie Aitken
Chief Officer (Legal & Democratic) 
Members : 
Clerk Name: Clare Louise McDonald
Clerk Telephone: 01698 302190
Clerk Email: mcdonaldcl@northlan.gov.uk
A McVey, F McKay, A Bustard, D Crichton, P Di Mascio, K Docherty, K Duffy, A Duffy-
Lawson, H Dunbar, W Goldie, L Jarvie, A Khan, J Leckie, F MacGregor, A Masterton, A
McCrory, M McPake, L Mitchell, L Nolan, L Roarty, G Robinson, R Sullivan, J Toner, S
Watson, C Williams.  
Page 1 of 64

Page 2

Page 2 of 64

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical Standards
In Public Life Etc. (Scotland) Act 2000   
Operational   
2 Transforming Places Economic Regeneration Delivery
Plan Action Plan 2024 25
Submit report by the Chief Officer (Place) seeking approval
for North Lanarkshire's Economic Regeneration Delivery Plan
(ERDP) Action Plan for 2024/25 
5 - 30 
3 Insourcing of the Lanarkshire Business Gateway Service
and Review of Business Support Services
Submit report by the Chief Officer (Place) seeking approval
for North Lanarkshire's Economic Regeneration Delivery Plan
(ERDP) Action Plan for 2024/25 
31 - 42 
4 Net Zero Business Challenge Fund
Submit report by the Chief Officer (Place) seeking approval
for a Net Zero Business Challenge Fund to support local
small to medium-sized businesses within North Lanarkshire to
reduce their environmental impact and improve
the sustainability of their operations 
43 - 50  
Contracts   
5 Contract Award for East Airdrie Link Road Stage 3
(Preliminary Design & Planning)
Submit report by the Chief Officer (Place) seeking
approval for the award of a contract for Professional Service
for Stage 3 of the East Airdrie Link Road Project 
51 - 60 
6 Contracts Awarded Below Committee Approval Threshold
Submit report by the Chief Officer (Assets and
Procurement) acknowledge the contract awards made since
last committee reporting cycle 
61 - 64 
Page 3 of 64

Page 4

Page 4 of 64

Page 5

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    PH/SH/MH Date 16/02/24 
Transforming Places
Economic Regeneration Delivery Plan
Action Plan 2024/25 
From  Pamela Humphries, Chief Officer (Place)  
Email Hyndsm@northlan.gov.uk Telephone
Mark Hynds,
Economic Analyst
07583 023 248 
Executive Summary
The purpose of this report is to seek approval for North Lanarkshire’s Economic Regeneration
Delivery Plan (ERDP) Action Plan for 2024/25. 
The ERDP is a high-level economic development framework which is aligned to the composite
capital programme and delivers on the first priority of The Plan for North Lanarkshire –
improving economic outcomes and opportunities for all. It cuts across various themes of the
Programme of Work but mainly focuses on the Transforming Places workstream.   
An updated ERDP was approved by the Enterprise & Fair Work Committee in February 2023
and covers the period 2023-2028. 
Since 2019, an ERDP Action Plan has been developed annually, detailing the key milestones
and targets North Lanarkshire Council and our partners will take over the coming financial
year to achieve the recommendations set out across the ERDP’s 4 key interrelated themes. 
Subject to committee approval, this 2024/25 action plan will undergo monitoring and review
with an end year performance report due to be presented to committee Cycle 3 2025,
alongside the ERDP Performance Framework which is used to monitor wider ERDP
performance over the short, medium and longer-term (through to 2035). 
A copy of the draft ERDP Action Plan 2024/25 is appended to this report. 
Recommendations
It is recommended that Enterprise and Fair Work Committee: 
(1) Approve the ERDP Action Plan 2024/25 which is attached to this report as an
appendix. 
(2) Recognise that an annual performance report detailing progress against the
2023/24 Action Plan and wider ERDP Performance Framework will be presented
to Committee in cycle 3 2024. 
Item 2
Page 5 of 64

Page 6

Programme of Work  Transforming Places 
1. Background 
1.1 The 2023-2028 ERDP, approved by Enterprise & Fair Work Committee in February
2023, aims to help co-ordinate physical and economic regeneration activity across North
Lanarkshire, increase economic output and help address social and economic inequality.
It continues to build upon the first ERDP which covered the period 2019-2023 and
focuses on the same four key interrelated themes. 
1.2 Since 2019, an Action Plan to support the delivery of the ERDP through a range of key
measures and investment programmes has also been produced and approved each year
by committee. The Action Plan sets the priorities for the financial year ahead, reflecting
progress made to date and the evolving priorities of the council.  The current 2023/24
ERDP Action Plan was approved in February 2023. 
1.3 An accompanying ERDP Performance Framework was approved by Enterprise and
Growth Committee in February 2021. This comprises of a group of performance
indicators at three levels. These indicators aim to collectively provide an overview of how
the North Lanarkshire economy is performing as well as helping us to understand the
impact that the delivery of the ERDP is having on improving economic opportunities and
outcomes for all. 
1.4 Since the inception of the ERDP, several significant milestones have been achieved
through the delivery of the New Supply, Growth and City Deal programmes.  These
achievements have been reported to committee in previous annual progress and
performance updates. The next performance report will be presented to committee in
Cycle 3 2024, detailing progress against the 2023/24 ERDP Action Plan and wider ERDP
Performance Framework. 
(3) Acknowledge that an annual performance report detailing progress against the
2024/25 Action Plan and wider ERDP Performance Framework will be presented
to Committee in cycle 3 2025. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (1) Ensure a housing mix that supports social inclusion and
economic growth 
(2) Refocus our town centres and communities to be multi-
functional connected places which maximise social, economic, and
environmental opportunities 
(3) Maximise the use of our marketable land and assets through
improved development in business and industrial infrastructure 
(4) Market and promote North Lanarkshire as the place to live,
learn, work, invest, and visit 
(5) Grow and improve the sustainability and diversity of North
Lanarkshire's economy
Page 6 of 64

Page 7

2. Report 
Economic Regeneration Delivery Plan 2023-2028 
2.1 The refreshed ERDP continues to focus on the same four key inter-related themes as
the 2019-23 plan: 
• developing housing that promotes improved quality of life and creates a better place
to live;
• reshaping our town centres to ensure that these provide modern and attractive
centres that meet the needs of our communities;
• improving our business and industrial infrastructure, creating opportunities for
investment and for companies to start-up or relocate here; and
• continuing to improve our connectivity and develop new opportunities by
transforming our road, rail and digital infrastructure.
2024/25 Action Plan
2.2 To support the delivery of the ERDP objectives, annual ERDP Action Plans have been
developed each financial year since 2019/20. 
2.3 Appendix 1 provides detail on the key ERDP actions, targets and objectives for 2024/25. 
This is aligned to the four themes of the ERDP and details which ERDP priority each
action is specifically seeking to achieve.   
2.4 The delivery of the Action Plan will be overseen by the ERDP Steering Group with
progress updates provided to committee on an annual basis. Detailed reports concerning
individual project and programmes within the ERDP (e.g. City Deal Programme) are also
provided to committee on a regular basis.   
3. Measures of success 
3.1  The annual ERDP Action Plan contains multiple targets with achievement of the targets
being key to the success of the refreshed ERDP. 
3.2  A robust Economic Performance Framework has been established and contains a series
of key performance indicators, with short, medium, and long-term targets attached as the
operational measures of success. 
4. Supporting documentation 
Appendix 1 Economic Regeneration Delivery Plan Action Plan 2024/25 
Pamela Humphries
Chief Officer (Place) 
Page 7 of 64

Page 8

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐  
If Yes, please provide a brief summary of the impact? 
The primary aim of the 2023-2028 ERDP is to support inclusive economic
growth and opportunities for all. In doing so it aims to support investment in
creating a more equitable and fairer place for residents of North Lanarkshire to live. 
If Yes, has an assessment been carried out and published on the council’s
website? 
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The 2023 - 2028 ERDP is funded through a mixture of external funding sources,
and from the council’s capital programmes.   
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒
Page 8 of 64

Page 9

If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☒ 
If Yes, please provide a brief summary of the impact? 
The 2023-2028 ERDP remains one of the council’s key strategies and will be
promoted accordingly through corporate communications, mainly via our digital
platforms. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Risks are recorded and managed within Corporate Risk Register. 
Key risk is failure to deliver on the ERDP and its objectives of helping co-ordinate
physical and economic regeneration activity across North Lanarkshire, increasing
economic output and helping address social and economic inequality. This would
result in economic and social benefits to residents and business across North
Lanarkshire and significant reputational damage to the Council given the
widespread public nature of the programme. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)?
Page 9 of 64

Page 10

Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 10 of 64

Page 11

Appendix 1 
ERDP Action Plan 
2024/25 
Page 11 of 64

Page 12

Theme: Live
ERDP Priority 1: Developing housing that promotes improved quality of life and creates a better place to live
Reference Number ERDP Priority  What we’ve delivered so
far…
What we’ll aim to deliver
during 2024/25…
Lead Team
1.1 Continue to focus
investment towards the
council’s affordable
housing stock to make
sure that the target of
5,000 new council homes
for North Lanarkshire is
reached by 2035
Between 2010/11 and
2022/23 NLC has
delivered 1,016 new build
homes across the
authority via the New
Supply Programme alone,
with a further 334
scheduled to complete
during 2023/24.
Completion of 268 new
build homes during
2024/25.
New Supply
1.2 As of 31 March 2023, NLC
has brought 630 homes
into council ownership
since the introduction of
the Open Market/Empty
Homes Purchase
Schemes, with a further
125 estimated to be
completed during
2023/24.
100 Open Market/Empty
Homes Purchase Scheme
completions during
2024/25
New Supply
1.3 As of 31 March 2023, NLC
has acquired 123 new
build homes from the
private sector, with a
further 78 planned to be
completed during
2023/24. 
Complete the acquisition
of 82 new build off the
shelf units during
2024/25.
New Supply
Page 12 of 64

Page 13

1.4 Continue to support the
delivery of the affordable
housing programme
including intermediate
tenures such as mid-
market rent
Between 2010/11 and
2022/23, 1,646 affordable
homes have been
delivered via the council’s
New Supply Programme
and 2,319 by Registered
Social Landlords (RSL’s)
Prepare the 2025/26
Strategic Housing
Investment Plan (SHIP)
which will identify sites to
meet Local Housing
Strategy priorities and
maximises the use of
available Scottish
Government grant
funding. 
Support the delivery of
sites within the current
2024/25 SHIP.
New Supply
1.5 Enable private sector
housing development to
support the local
economy and the
regeneration of strategic
sites such as Ravenscraig.
2,659 private tenure
houses were completed
and occupied across
North Lanarkshire
between 2019/20 and
2022/23. 
A further 867 private
tenure units are
estimated to be
completed during
2023/24.
943 private tenure units
estimated to be
completed during
2024/25.
Planning 
Page 13 of 64

Page 14

Theme: Invest
ERDP Priority 2: Reshaping our town centres to ensure they provide modern and attractive centres that meet the needs of our
communities
Reference Number ERDP Recommendation What we’ve delivered so
far…
What we’ll aim to deliver
during 2024/25…
Lead Team
2.1 Establish and commence
delivery of town action
plans for all eight town
centres (aligned with our
approved town visions),
agreeing short, medium
and long-term investment
plans for each.
Eight Town Visions were
approved by committee
in 2021. 
Town Action Plans have
been developed and
approved for Airdrie,
Motherwell and Wishaw.
Finalise Town Action Plans
for Bellshill, Kilsyth and
Shotts.
Growth
2.2 Initial consultation has
commenced with the
Coatbridge Community. 
North Lanarkshire Council
has had early discussions
with the UK Government
around the Long-Term
Plan for the £20m Town
Fund awarded to
Coatbridge town centre. 
Production and submission
of a Town Action Plan for
Coatbridge by August 2024,
aligned to the UK
Government’s
requirements for the Long-
Term Plan for Towns
funding to secure and draw
down the first tranche of
the £20 million allocated to
Growth
Page 14 of 64

Page 15

Coatbridge over the next
10 years
2.3 NLC has acquired The
Centre Cumbernauld,
with the intention to
demolish the building and
redevelop Cumbernauld
town centre.
Continue with The Centre
Cumbernauld project,
including business and
stakeholder engagement.
Growth 
2.4 Between 2010/11 and
2022/23 there were 1,663
new homes delivered
within North
Lanarkshire’s town
centres (including edge of
town developments).
These properties have
been delivered by NLC
and Registered Social
Landlords (RSLs)
NLC and RSLs to deliver 105
new affordable homes
within our town centres
(including edge of town)
during 2024/25. 
New Supply
2.5 Continue to prioritise
funding and secure
external investment for
the regeneration of our
town centres.
Placed Based Investment
Programme secured so
far:
- £2.807m in 2021/22
- £2.436m in 2022/23
- £1.698m in 2023/24
Deliver the Scottish
Government’s Placed Based
Investment Programme
(PBIP) anticipated
allocation of £1.698 million
for 2024/25.
Growth
2.6 £150k secured from
Historic Environment
Scotland (HES) and
National Lottery Heritage
Fund (NLHF) to develop
Submit a final stage funding
application for
approximately £2.5m to
HES and NHLF to support
Growth
Page 15 of 64

Page 16

plans during 2023/24 to
deliver a heritage-led
regeneration project in
Airdrie.
the Rediscovering Airdrie
project. 
It is proposed that this
project will include the
redevelopment of Airdrie
Library, the repurposing of
Airdrie Town House, and
shopfront improvements
through grants to property
owners. 
2.7 NLC now has an
established process in
place for inviting
Expressions of Interest
from local community
organisations, with
support in place to submit
external funding
application forms where
project ideas meet
funding criteria.
Continue to promote and
engage with local
community organisations
to enable external funding
applications to third party
regeneration funds, where
appropriate (e.g. Scottish
Government’s
Regeneration Capital Grant
Fund)
Growth
2.8 NLC has a track record of
supporting community
led projects to secure
funding, to deliver
projects and draw down
awarded funds. 
Support community led
projects, successfully
funded under Scottish
Government regeneration
funds, including the
Regeneration Capital Grant
Growth
Page 16 of 64

Page 17

Project examples include
Springhill Community Hub
(Shotts) and The Well Hub
(Motherwell)
Fund (RCGF) and Vacant
and Derelict Land
Investment Programme
(VDLIP)
2.9 Review how NLC can be
more effective in
addressing failing
buildings in our town
centres, including
potential use of
Compulsory Purchase
Orders (CPO) were
required
Since 2018/19, 58 town
centre buildings or vacant
sites have been re-
purposed or redeveloped
(including edge of town),
across the authority. 
A further 20
properties/sites have
been acquired by the
council with a view to
either converting existing
properties to residential
developments, building
new homes on cleared
sites or upgrading
commercial premises.
Continue to engage with
local property / landowners
with a view to acquiring key
town centre properties /
sites earmarked for
conversion /
redevelopment. 
Where necessary,
commence CPO processes,
as a last resort, if failure to
purchase a site would be
detrimental to town centre
regeneration plans.
Growth
Theme: Invest
ERDP Priority 3: Improving our business and industrial infrastructure, creating opportunities for investment and for companies to start-up
or relocate here
Reference Number ERDP Priority  What we’ve delivered so
far…
What we’ll aim to deliver
during 2024/25…
Lead Team
3.1 Promoting a mix of
development across our
motorway corridors and
£2.85m invested in
business and industry
zoned land or upgrades to
NLC and Fusion Assets to
invest a minimum of £3
million in key business and
Fusion Assets /
Growth
Page 17 of 64

Page 18

accessible business
locations to support the
development of our
foundational economy as
well as high-end growth
existing business and
industrial infrastructure
between 2018/19 and
2022/23. 
This includes NLC and
Arms-Length External
Organisations only.
industrial projects – (e.g.
Condor Park and Braidhurst
Industrial Estate)
3.2 £16.85m external, private
or loan funding secured
for investment in office
and industrial
developments across
North Lanarkshire
between 2018/19 and
2022/23.
£5 million external funding
(including private sector
funding) to be secured by
NLC / Fusion Assets for
business and industrial
infrastructure in 2024/25 
Fusion Assets
3.3 117,410 sq.ft if
commercial workspace
created as a result of
investment by NLC,
Fusion Assets or North
Lanarkshire Properties
across North Lanarkshire
between 2018/19 and
2022/23. 
27,300 sq.ft of business and
industrial workspace to be
created or refurbished by
NLC, Fusion Assets and
North Lanarkshire
Properties in 2024/25. 
Growth / 
NLP / Fusion Assets
3.4 Secured £1.9m from the
Scottish Government’s
Regeneration Capital
Grant Fund (RCGF) and
£1.3m from the Place
Complete delivery of the
Braidhurst Industrial Estate
project. 
Growth
Page 18 of 64

Page 19

Based Investment
Programme (PBIP) to
support the delivery of
the Braidhurst Industrial
Estate project. 
Appointed works
contractor to deliver the
project works.
This project will deliver 10
new build business start-up
units and the
refurbishment of 6 existing
NLP owned units as well as
environmental and
infrastructure
improvements throughout
the estate. 
3.5 N/A Develop a Business and
Industry strategy and
related Action Plan which
will form part of evidence
base for next Local
Development Plan.
Enterprise
3.6 Continuing to support
enabling investment
which brings our vacant
and derelict land and
brownfield sites into
commercial use
7.74ha of land
remediated or improved
for business and industry
use across North
Lanarkshire between
2018/19 and 2022/23
4.5ha of land to be
remediated or improved
(by NLC or Fusion Assets)
for business and industry
use in 2024/25. 
Fusion Assets / 
Growth
3.7 Improving how we record
and respond to enquiries
from businesses to
provide a co-ordinated
approach across relevant
council services to help
A six-month Invest in NL
pilot commenced
September 2023 as part
of the new Programme of
Work. 
Progress delivery of the
Invest in NL Programme of
Work.
Place 
Page 19 of 64

Page 20

attract, retain and expand
business and employment
opportunities
The primary aim of the
Invest in NL advisory team
is to facilitate investment
in NL by providing a co-
ordinated advisory service
to help accelerate the
statutory consent process
for developers.  
3.8 NLC Business Solutions
has been developing a
Case Management
System that will allow
efficient and more
detailed recording and
reporting on the council’s
interactions with
businesses. 
It will also offer a better
customer experience by
allowing local businesses
24/7 access to a broader
range of council services
at the click of a button,
via their business
account.
Deploy and promote the
Case Management System
to North Lanarkshire based
businesses.
Enterprise
3.9 Building upon work which
supports innovation and
skill development through
the development of
Three sectoral learning
academies are being
taken forward under the
Brighter Futures
Deliver NL Academies
projects which are funded
via UK Shared Prosperity
Fund (UKSPF).
People Resources
Page 20 of 64

Page 21

sectoral learning
academies
Programme of Work (Built
Environment; Care and
Digital), to help attract
and train a workforce to
meet demand in these
key sectors and support
the local economy. 
The Built Environment
Academy and supporting
Sector Board will
implement, prioritise, and
progress its plan of work
and aim to implement a
sustainable funding model
for skills development
within the industry.   
Within Care, a focus on
collaborative
apprenticeships is planned,
along with ensuring
pathways for people to
work in the care sector are
developed. 
Within the Digital
Academy, work will be
progressed to develop an
approach to addressing the
digital skills gaps within
North Lanarkshire.
3.10 Supporting investment,
via our Arms-Length
External Organisations,
that will continue to
improve, modernise and
Planning approval has
been obtained for three
phases of development at
Gartcosh Industrial Park. 
Conclude sale of Phase 1
and progress the second
phase of development at
Gartcosh Industrial Park
which consists of a further
Fusion Assets
Page 21 of 64

Page 22

expand commercial stock
availability across North
Lanarkshire
Phase 1 is complete with
the construction of 3
industrial units totalling
60,000 sq.ft of class 4,5
and 6 floorspace. 
Following letting of the 3
units, the scheme is
currently being marketed
for sale by the JV
company as an
investment. 
3 units totalling 69,000
sq.ft. 
3.11 Fusion Assets have
secured planning consent
for a 41,000 sq.ft multi let
industrial scheme at
Condor Park consisting of
8 units. A further phase of
enabling works has been
completed.   
The terms of a Joint
Venture have been
agreed, subject to
securing loan financing. 
Progress delivery of Condor
Park, Eurocentral through
securing loan finance,
tendering the construction
contract and beginning
construction of a
speculative industrial
scheme to provide an
additional 41,000 sq.ft of
industrial space. 
Fusion Assets
Page 22 of 64

Page 23

3.12 Fusion Assets has
delivered a total of 83,000
sq.ft across three
buildings at Link Park,
Newhouse (47,500 sq.ft at
Plot A2through a
development agreement
and 35,000 sq.ft on Plot
A1 through direct build).
Following the successful
letting of Building 2,
explore funding
opportunities to complete
the development at Link
Park, Newhouse by
constructing a 20,000 sq.ft
industrial unit on the
remaining vacant plot. 
This is subject to a
successful NLC capital
funding bid and will also
include contributions from
the Scottish Government’s
Vacant and Derelict Land
Fund (VDLF) as well as
Fusion Assets funding.
Fusion Assets
Theme: Invest
ERDP Priority 4: Continuing to improve our connectivity and develop new opportunities by transforming our road, rail and digital
infrastructure
Reference Number ERDP Priority  What we’ve delivered so
far…
What we’ll aim to deliver
during 2024/25…
Lead Team
4.1 Continue to deliver the
City Deal Infrastructure
Programme
Ravenscraig Access
Infrastructure 
Planning approval granted
for new dual carriageway
from Ravenscraig
Regional Sports Facility to
Continue to progress the
delivery of Ravenscraig
Access Infrastructure
project to support the
redevelopment and
connect the M74 and M8
as part of the Pan
Enterprise Projects
Page 23 of 64

Page 24

Motherwell at the Airbles
Road/Windmillhill Street
junction. 
Bridge crossing under the
West Coast Mainline
Railway was completed in
2023. 
Land acquisition/ CPOs
concluded. 
Lanarkshire Transport
Corridor. 
Commence demolition
works to former business
sites at Airbles Road and
Windmillhill Street.
Procure and award a
contract for advanced
ground works. 
Procure and award a
contract for the dual
carriageway construction
works. 
Develop detailed designs
for upgrading the A723
from New Craig Road
junction at Ravenscraig to
the M8 at Holytown.
4.2 East Airdrie Link Road 
Ground investigation
works complete and
preferred option for East
Airdrie Link Road
identified.
Continue to progress the
delivery of the East
Airdrie Link Road to
improve north/south road
and active travel
connectivity as part of the
Pan Lanarkshire Transport
Corridor. 
Enterprise Projects
Page 24 of 64

Page 25

Progress Design Manual
for Roads and Bridges
(DMRB) Stage 3
consultancy services
contract. Confirm
alignment and commence
design. Commence
Environmental Impact
Assessment. 
Secure Outline Business
Case (OBC) approval from
the Glasgow City Region
City Deal Cabinet. 
4.3 A8/M8 Corridor Access
Improvements 
Outline Business Case
(OBC) for A8/M8 Corridor
Access Improvements
project approved. 
Progress delivery of the
Orchard Farm roundabout
to support the
development of key
business and industrial
sites on the A8/M8
corridor.  
Secure Full Business Case
(FBC) approval from the
Glasgow City Region City
Deal Cabinet.
Enterprise Projects
4.4 Eurocentral Strategic
Active Travel 
Sustainable transport
improvements form part
Progress delivery of the
Eurocentral Strategic
Active Travel project. 
Enterprise Projects
Page 25 of 64

Page 26

of the A8/M8 Corridor
Access Improvements
project which was
received Outline Business
Case (OBC) approval
Appoint consultants to
develop detailed designs
for Phase 1 (Holytown to
Eurocentral and Holytown
to Newhouse) and Phase
2 (Whifflet Corridor). 
Commence procurement
for construction works. 
Appoint consultants to
carry out an options
appraisal, select preferred
option and prepare
concept designs for Phase
3 (Bellshill to Mossend).
4.5 Invest in the delivery of
the council’s Active Travel
Strategy to ensure a
comprehensive
connection of active
travel routes to key
places across North
Lanarkshire
13.46km of active travel
routes created between
2019/20 and end of
2022/23. 
Project examples include
Newhouse to Salsburgh,
A71 Horsley Brae
(Wishaw), South Biggar
(Airdrie), Woodside Street
(Coatbridge), Ravenscraig
Active Travel Link Phase 2,
and Motherwell Station
Active Travel Phase 1A
Continue to develop the
Active Travel Strategic
Network Routes (SNRs),
to ensure a portfolio of
construction ready
projects can then be
progressed in line with
external funding
resources. 
Detailed designs for the 2
highest priority active
travel Strategic Network
Routes (SNRs) will be
Infrastructure &
Transportation
Page 26 of 64

Page 27

progressed during 24/25.
These are:
• SNR7 (Uddingston to
Caldercruix via
Coatbridge and Airdrie
utilising both NCN75
and A89 route
operations)
• SNR9 (Airbles Road to
South Lanarkshire at
Strathclyde Country
Park and to Bothwell) 
4.6 Ravenscraig Active Travel
Links 
Construction of Phase 1
and Phase 2 of the
Ravenscraig Active Travel
Links project completed. 
Motherwell Station
Active Travel Links
Construction of Phase 1a
(Muir Street to Braidhurst
Industrial Estate) of the
Motherwell Station Active
Travel Links project
completed. 
Continue to progress
delivery of the
Motherwell Station Active
Travel Links project. 
Complete detailed design
for Phase 2 of the project
(Bellshill Road).
Enterprise Projects
Page 27 of 64

Page 28

Detailed design of phases
1b and 1c (Motherwell
Rail Station and town
centre to the Civic Centre)
complete. 
4.7 Ensure that inclusive
economic growth remains
at the heart of
opportunity to support
affordable and accessible
transport systems (via the
Local Transport Strategy)  
N/A Develop North
Lanarkshire’s Local
Transport Strategy, which
will be the mechanism for
delivering on this ERDP
recommendation.
Infrastructure &
Transportation
4.8 Support the delivery of
Electric Vehicle (EV)
charging infrastructure
and other green transport
solutions across North
Lanarkshire
Progressed work to
develop a Glasgow City
Region EV Charging
Strategy.
Develop and implement a
Glasgow City Region
approach to appoint a
provider to increase,
manage and maintain
public EV infrastructure. 
Community Operations
4.9 Work with the council’s
digital partner to install
and invest in
infrastructure that helps
create one of the best
and most
affordable/accessible
digital provisions in the
UK.
Significant progress has
been made against the
fibre rollout to complete
the Wide Area Network
(WAN). This is key to
enabling the provision of
internet services and
public wi-fi.
Completion of the
councils Wide Area
Network (WAN),
integrating all Corporate
and Education sites. 
Progress next phase of
call off contracts covering
public Wi-Fi and CCTV
services.
Business Solutions
Page 28 of 64

Page 29

4.10 As part of the Comms
World Framework a
number of community
benefits have been
delivered, including:
• 6 Modern
Apprentices  recruited
via NLC/Commsworld
shared Apprenticeship
Model
• Delivery of
SmartSTEM
programme across
North Lanarkshire
schools including 1
primary school
flagship event (200
attendees), 1
secondary school
flagship event (200
attendees), and
delivery of 20
individual primary
school workshops to
1,418 pupils.
• Development of an
interactive, online
map highlighting
organisations and
NLC and Commsworld Ltd
will continue to maximise
added value via the
Framework Agreement
for the provision of digital
connectivity services and
associated call-off
contracts, ensuring the
delivery of Community
Benefits and additional
value throughout
2024/25. 
The additional value will
focus on increasing full
fibre coverage, take-up of
services and vouchers,
choice & innovation and
future proofing. 
Business Solutions
Page 29 of 64

Page 30

venues delivering
community based
digital services and
resources across
North Lanarkshire.
• Delivery of a flagship
business event
"Accelerate North
Lanarkshire" attended
by 196 people in
Motherwell Concert
Hall and Theatre. 
Page 30 of 64

Page 31

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    PH/YW Date 16/02/24 
Insourcing of the Lanarkshire Business Gateway Service and
Review of Business Support Services 
From  Pamela Humphries, Chief Officer (Place)  
E-mail weiry@northlan.gov.uk Telephone 07508 001238 
Executive Summary
Further to the decisions made by North Lanarkshire Council’s Enterprise and Fair Work
Committee meeting on 4 September 2023, and South Lanarkshire Council’s Community
and Enterprise Resources Committee on 29 August 2023, this report provides an update
on progress with insourcing the Lanarkshire Business Gateway Service from 1 March
2024. 
The insourcing of the Lanarkshire Business Gateway Service contract gives rise to a
relevant transfer under the Transfer of Undertakings (Protection of Employment)
Regulations 2006 (TUPE) as this is a service provision change and, specifically, a change
in the provider of a service by way of insourcing as activities are ceasing to be carried out
by a contractor on behalf of both North and South Lanarkshire and will be carried out
instead by North Lanarkshire Council on behalf of both North and South Lanarkshire
Councils.   
There are a number of employees of Enterprise North East Trust Ltd (Elevator) who are in
scope to transfer to North Lanarkshire Council on 1 March 2024 upon termination of the
existing contract.   
The report provides an update on the proposed future operating model for the Business
Gateway service and highlights that a wider review of the Council’s own business support
services will be undertaken to ensure effective co-ordination and alignment of business
support services and make best use of available resources.   
Recommendations
It is recommended that Committee: 
(1) Note the position in relation to the insourcing and transfer of employees from
Enterprise North East Trust Ltd (Elevator); and 
(2) Endorse the proposals for a review of wider business support services. 
Item 3
Page 31 of 64

Page 32

1. Background 
1.1. Business Gateway is a publicly funded service delivered through Scottish Local
Authorities providing access to free business support / impartial advice to start-up and
existing businesses in Scotland. Business Gateway has an important role to play in
promoting an entrepreneurial culture within Scotland and stimulating awareness of,
and demand for, business support services (both public and private sector) among
Scotland’s business base. 
1.2. Business Gateway has the following service objectives: 
• Support more people with their ambitions to start a business; 
• Support more businesses to survive and achieve their growth ambitions 
• Support more people with their aspirations for high business growth; and, 
• Support more people from underrepresented groups to access mainstream
business support. 
1.3. Underpinning the service objectives there is a commitment to providing support
across a number of themes such as Carbon Reduction, Fair Work, Innovation,
Internationalisation, Digital Upskilling, Community Wealth Building, and Job Creation. 
1.4. Business Gateway Key Principles have been developed and endorsed by Scottish
Government and Local Government. Local Government remains responsible for
ensuring that these principles are implemented. The eight key principles are: 
1. Local Authorities are responsible for local economic development and Business
Gateway is a key element of the support they provide to businesses. 
2. Businesses across Scotland can expect a consistent start-up service and a
consistent established business service. These core services are complemented
by local services, designed by local authorities responding to the needs and
opportunities of their local business base. 
3. Business Gateway will be well integrated with other local authority services
impacting on business to ensure that businesses get the information they need to
set up and flourish. 
4. Business Gateway will ensure its services are accessible, making best use of digital
technology. 
5. Business Gateway is a key part of the economic development landscape and will
operate in a joined-up way with the range of other organisations offering business
support with a particular role in signposting to relevant expertise and specific and/or
sectoral support. 
6. Local authorities across Scotland will use the Business Gateway brand within
agreed guidelines. 
7. Business Gateway will engage with businesses and their representative
organisations to ensure they are responsive to business needs. 
8. The governance structure and accountability of the Business Gateway will be clear
and effective at the local authority level and at the national level.
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (5) Grow and improve the sustainability and diversity of North
Lanarkshire's economy
Programme of Work Brighter Futures
Page 32 of 64

Page 33

1.5. A new National Service Specification for Business Gateway was approved by CoSLA
Leaders on 24 November 2024. This identified the following four key service areas
which will form Business Gateway from 1 April 2024: 
1. Start-Up Advisory Service (core service); 
2. Existing and Growing Businesses Service (core services); 
3. Business Gateway Local Services (determined locally to meet local needs); and 
4. Additional Services utilising external funding (where appropriate and to meet local
needs) 
1.6. There will also be a robust, consistent Aftercare programme developed nationally as
part of the renewal of the Business Gateway service, using best practice from around
the network to design the programme that can be successfully delivered locally. 
1.7. The new National Service Specification has also identified the following Customer
Categories which will form part of the local service specification and operating model:
• Pre-start: An individual who has indicated an interest in starting a business. 
• Pre-start Plus: An individual with a clear plan for a new business which has the
potential to show sustained levels of growth and offer employment. 
• New Business: A business up to one year from being ‘claimed’ as a start-up.
• New Business Plus: A business up to one year from being ‘claimed’ as a start-
up that was previously in the Pre-Start Plus category. 
• Business Base: Any existing business. 
• BG Growth: A trading business with plans for significant growth. 
• Local Priority: To be determined by individual areas but expected to be for
businesses who do not meet the BG Growth definition, and who are eligible for
individual local authority support programmes. 
1.8. The nature and intensity of the support provided will be determined by client needs
and ambitions, and the potential for economic impact, hence the expectation that
those offering higher growth potential will typically receive more intensive support. 
1.9. North Lanarkshire Council has managed the delivery of Business Gateway Services
on behalf of both North and South Lanarkshire Councils since 1 April 2008. The
service since then has been delivered through outsourced contracts. Following the
conclusion of an options appraisal carried out earlier this year, both Councils obtained
Committee approval to insource the service with effect from 1 March 2024 with North
Lanarkshire Council delivering the service on behalf of both Councils. A letter
terminating the current contract with effect from 29 February 2024 has been issued to
the current service provider Enterprise North East Trust Ltd (Elevator). This has been
acknowledged in writing by Elevator. 
1.10. In addition to Lanarkshire Business Gateway Services, the Council is already
delivering a complementary range of business support services through the
Enterprise Development Team. These services include: 
• Business Grant Funding – through the delivery of the Council’s Business Start-
Up Fund, the Small Business and Self-Employed Support Scheme, The Energy
Audit Voucher Scheme, the Business Growth Fund, the Tourism Challenge Fund
and subject to approval, the Net Zero Business Challenge Fund. With the
exception of the Energy Audit Voucher Scheme, these funds are all supported by
the UK Shared Prosperity Fund (UKSPF).
Page 33 of 64

Page 34

• Expert Help Framework – funded through the UKSPF, the Framework provides
up to five days of specialist consultancy support to businesses in the areas of
Financial Management; Human Resources, Leadership and Skills; Procurement;
Marketing; Information and Digital Technology; Legal Support; Energy Efficiencies
and Net Zero; Business Development; and New Market Opportunities and
Internationalisation 
• Inward Investment and Business Engagement – this includes the delivery of
the Council’s inward investment activities and campaigns, the provision of a single
point of contact for investors and businesses looking to locate in North Lanarkshire
or do business with North Lanarkshire Council, and the provision of free property
and land searches. 
• Business and Industry Strategy – the team are leading on the development of
the Council’s Business and Industry Strategy. 
• Procurement and Supply Chain Development – this includes the local delivery
and promotion of the national Supplier Development Programme which provides
support to those looking to tender with the public sector and the delivery of
Lanarkshire Meet the Real Buyer Event which enables businesses to engage on
a 1-2-1 basis with buyers from the public sector and Tier 1 contractors. In addition,
the team arrange for bespoke tender training for specific tenders and meet the
buyer events linked to key contract opportunities. 
• Sector-Specific Support 
o Manufacturing – through the continued delivery of Smart Hub Lanarkshire
and wider sectoral activities.
o Tourism – through the delivery of the North Lanarkshire Tourism Strategy
and visitor destination marketing via the Visit Lanarkshire brand. Funding
is also in place through the UKSPF to deliver a heritage trail, support
bespoke marketing activity and to deliver the tourism challenge fund.
o Social Enterprise – through the delivery of the North Lanarkshire Social
Enterprise Framework and Action Plan including the delivery of bespoke
social enterprise support funded through the UKSPF.
o Construction and Built Environment – through the delivery of the Hub
South West Build Lanarkshire programme and work to support the
development of the sector and pathways into the sector for young people
and those seeking employment.
o Digital and Creative – engagement with businesses to address the digital
skills gaps and shortages, and development of support for the film and
creative sector including the delivery of Lanarkshire Screen Locations
which provides a free support service for filming enquiries in North
Lanarkshire.
o Fair Trade – promotion of Fair Trade across North Lanarkshire to support
the council’s Fairtrade Zone status, local businesses and communities.
o Food and Drink – support for the development of Lanarkshire Larder and
wider sectoral initiatives.
o Life Science – direct engagement and officer-led support for the growing
sector. 
Page 34 of 64

Page 35

• Development of Entrepreneurship – Through UK Shared Prosperity Funding,
the Council is delivering bespoke community-based advice and support to
individuals who typically experience structural barriers to self-employment or
running their own business. This support includes the development of Lanarkshire
Women in Business programme, the development of a women’s business
incubator in Airdrie and tailored business support to the Black and Minority Ethnic
(BAME) communities in North Lanarkshire. 
• Development of the Young Entrepreneur – working with education to develop
and deliver pathways into entrepreneurship for young people including the
delivery of the annual Dragons’ Lair Competition for teams of S3 pupils across
North Lanarkshire. 
• Business Events – delivery of keynote business events including the annual
Lanarkshire Business Excellence Awards, Lanarkshire Meet the Real Buyers and
an annual digital business event delivered in partnership with Commsworld.   
2. Report 
2.1. This report provides an overview on progress with the transfer of Lanarkshire
Business Gateway services and also an overview of the review of the Council’s
current business support services. 
In-Sourcing of Lanarkshire Business Gateway Services 
2.2. The termination of the Business Gateway Lanarkshire Service contract is a relevant
transfer and, specifically, a service provision change under Regulation 3 of TUPE. 
Following discussion and correspondence with Elevator, it has been determined that
the additional conditions for a service provision change have also been satisfied: 
• there is an organised grouping of employees situated in Lanarkshire; 
• the principal purpose of the organised grouping is the carrying out of the activities
on behalf of North and South Lanarkshire Councils; 
• North Lanarkshire intends to carry out the activities on its own behalf and on
behalf of South Lanarkshire Council; 
• The activities do not relate to a single specific event or short-term task; and 
• The activities do not consist wholly or mainly of the supply of goods for North
Lanarkshire’s use. 
2.3. As this is a relevant transfer, the contracts of employment of transferring employees
do not terminate, but transfer. An employee caught by the automatic transfer principle
transfers on existing terms of employment and with continuity of service intact.  This
automatic transfer principle extends to both contractual and statutory benefits.   
2.4. Engagement is underway with the employee representatives regarding the transfer to
the Council Individual meetings with employees have also taken place which includes
an initial introduction and induction to working for North Lanarkshire Council in
advance of their start date of 1 March 2024. 
Page 35 of 64

Page 36

2.5. An interim operating structure has been developed, incorporating all of the current
staff covered under the TUPE transfer and has been subject to discussion with the
employee representatives. It is currently anticipated that 20 posts equating to 18.4
FTE will transfer to the council to deliver the Lanarkshire Business Gateway service.   
2.6. The following table highlights the proposed changes to governance once the service
has transferred to North Lanarkshire Council. A Service Level Agreement is being
drawn up to reflect the role of North Lanarkshire Council and how the service will be
managed and delivered by North Lanarkshire Council on behalf of both Councils. 
Current Governance  Proposed Governance
Contract Management – NLC on behalf of
NLC and SLC
Service Management – NLC on behalf of
NLC and SLC
Lead Officer Group – NLC/SLC - Monthly Lead Officer Working Group – NLC/SLC
– Monthly 
NLC/SLC Memorandum of Understanding Service Level Agreement between North
and South Lanarkshire Council including
a Data Processing Agreement
Business Gateway Lanarkshire Steering
Group – officer/member group chaired by
SLC which meets quarterly to oversee
delivery;  two elected members from each
council on the Steering Group.
Business Gateway Lanarkshire Board –
comprising senior officers from North
and South Lanarkshire and relevant
managers to monitor service delivery -
Quarterly 
6-monthly reports to respective service
Committees 
Marketing, Social Media and PR 
2.7. A communication and marketing plan is being developed. This is being supported by
Strategic Communications and will be agreed with South Lanarkshire Council. 
2.8. There is a national marketing budget for Business Gateway held by CoSLA. A
proportion of the national marketing spend will be allocated to fund local marketing
activity across North and South Lanarkshire Council areas. This activity will be
planned by the Business Gateway National Unit (BGNU) with input from Local
Authority Service Managers. The budget will not transfer to North Lanarkshire
Council. Any wider marketing undertaken locally including events and PR is required
to follow Business Gateway brand guidelines and utilise the national marketing
toolkits. It is proposed that the Council will maintain a small additional marketing
budget for ad hoc activities that cannot be funded through the national budgets. 
Quality Standards and Survival Monitoring 
2.9. There is an expectation that once transferred to North Lanarkshire, the Lanarkshire
Business Gateway service will deliver a high-quality service, and that minimum quality
standards will be met in line with the levels of service which clients can expect.
Performance against these standards will be monitored to ensure that clients
Page 36 of 64

Page 37

accessing support from Lanarkshire Business Gateway service are receiving a high-
quality service, and identify any areas for improvement.  Customer Satisfaction is also
monitored closely and this is undertaken by an independent body appointed by the
Business Gateway National Unit (BGNU) to all individuals who receive a service. 
2.10. BGNU will also deliver a robust survival monitoring methodology on behalf of the
council. Clients who have been given assistance to start a new business are
contacted via text survey at the 12 month and 36-month anniversary of their trading
start date to determine if they are still in business. The responses from the survey are
reported at a national and regional level on an annual basis. 
Premises 
2.11. As a nationally recognised brand, and to maintain brand awareness, it is preferable
that the Service be delivered in suitable branded premises for customers to easily
access. A potential working base for staff is being progressed within the Dalziel
Business Centre. The Business Centre provides a professional working environment
for staff within a public-facing building. In addition, the Business Centre has bookable
training facilities which can support event delivery which is a key feature of the
ongoing service provision. 
2.12. Additional premises are being identified within the estates of both North and South
Lanarkshire Council for the Business Gateway staff to use as touchdown facilities, to
meet clients and to deliver events. As the service covers both North and South
Lanarkshire Council areas it is important that the service is visible across all areas
and would include Hubs, libraries and community facilities. 
Wider Review of Business Support Services 
2.13. As outlined in section 1.7 above, the Council is already delivering a complementary
range of business support services through the Enterprise Development Team. It is
proposed that in-line with the in-sourcing of the Lanarkshire Business Gateway
Services, all business support services will be reviewed during 2024 to ensure that
best use is made of available resources to deliver effective business support across
Lanarkshire.  The review will identify any opportunities and/or gaps in provision,
consider opportunities for external funding, income generation and efficiency savings,
consider the changing external environment and business needs in North
Lanarkshire, and consider associated key performance indicators. 
2.14. The review will also consider:
• How the Council engages with businesses to improve coordination across
services
• How bespoke support to businesses looking to set up and locate or expand in
North Lanarkshire is delivered
• How entrepreneurialism is promoted in North Lanarkshire to raise business birth
and survivability rates
• How businesses are supported to improve their digital capabilities
• How businesses are supported to reduce their carbon emissions and achieve net
zero
• How to engage businesses in Community Wealth Building
• How to better understand and help meet the skills and employment needs of
businesses to improve access to employment, training, and work experience
opportunities for residents and young people.
Page 37 of 64

Page 38

2.15. It is proposed that a review of these services will be undertaken and concluded by
autumn 2024 bringing forward key recommendations for consideration following this
review. 
3. Measures of success  
3.1. Delivery of an insourced operating model and approach which ensures services are
fully aligned and integrated with business-facing services and aligned within the Plan
for North Lanarkshire and Programmes of Work along with associated South
Lanarkshire Council services and plans within the available budget envelope, meeting
performance and quality standards. 
3.2. As well as any local measures of success, a new Performance Measurement
Framework is being put in place nationally for Business Gateway which will include: 
• Input measures: resources committed to Business Gateway services (financial
and human resources); 
• Activity measures: number of enquiries received, appointments, phone calls,
letters and emails completed, number of defined products delivered, number of
referrals made (internal and external partners), category referrals completed,
research requests made to EFRS, aftercare activity and number of event
attendees are uploaded to the BG Datawarehouse ultimately allowing a
calculation of the number of unique clients supported. 
• Output measures: number of businesses achieving a growth category (formerly
segmentation); number of completed action plans (including cross cutting
themes, for example sustainability, exporting, innovation, fair work which will
provide a degree of flexibility to meet changing economic priorities). 
• Outcome/ impact measures: number of viable new business starts; improved
survival rates of new businesses; tracking employment in supported businesses;
level of business ambitions met. 
3.3. As the new Performance Measurement Framework is substantially different from the
current Framework, work is underway to map existing deliverables to support the
identification of initial targets which will remain under review during the first year of
delivery. 
3.4. In relation to quality assurance and customer satisfaction, a minimum score of 80%
will be expected across the following four KPIs on a quarterly basis: 
• overall satisfaction with the service received; 
• whether the service delivered met expectations; 
• benefits the business will gain from the service received; and 
• whether the client would recommend Business Gateway to someone else. 
Page 38 of 64

Page 39

4. Supporting documentation 
4.1. There is no supporting documentation. 
Pamela Humphries
Chief Officer (Place) 
Page 39 of 64

Page 40

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The service provides support to individuals looking to become self-employed or to
set-up a business and also provides support to existing self-employed individuals
and businesses to assist them to grow. The EQIA considers how the service will be
accessible to all and any positive actions proposed. This will be a working
document with related equalities workplan. In addition, businesses supported will
also be encouraged to consider equalities and Fair Work practices. The service will
also report equalities information through its KPIs. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The cost of the insourced service will be contained within the current operating
budget of £1.15m. 
In addition to the operational costs, there will be one-off costs associated with the
transfer. It is estimated this will be in the region of £80 - £100,000 which can be
met from Business Gateway earmarked reserves. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
It has been established that the insourcing of the Lanarkshire Business Gateway
Service contract gives rise to a relevant transfer under the Transfer of undertakings
(Protection of Employment) Regulations 2006 (TUPE). There are a number of
employees who are in scope to transfer to North Lanarkshire Council. 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Page 40 of 64

Page 41

Notice for the termination of the current contract with effect from 29 February 2024
has been given. Consideration is being given to ensure all contractual obligations
are met. A Service Level Agreement with South Lanarkshire Council is also being
developed.
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☒ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☒ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The service will require access to IT equipment and mobile telephones. Access to
software and platforms will be required with staff required to maintain their
bgateway.com emails as well as new Northlan.gov.uk emails. In addition, a central
telephone number linked to mobiles will be required. The new premises will also
require WiFi and access to network connectivity. Discussions on the above have
taken place with Business & Digital team. 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
It should be noted that the service will support businesses to reduce their carbon
footprint and work towards net zero.
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
There will be communication required with Business Gateway customers and
stakeholders to advise of the change. In addition, the Council will be responsible for
local marketing of the service and event delivery. The Council will assume
responsibility for the local Business Gateway social media channels. A
communication and marketing plan is being developed.
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Page 41 of 64

Page 42

A detailed Project Risk Register has been developed. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 42 of 64

Page 43

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref     Date 16/02/24 
Net Zero Business Challenge Fund 
From  Pamela Humphries, Chief Officer (Place)  
E-mail weiry@northlan.gov.uk Telephone Yvonne Weir, 07508
001238 
Executive Summary
The purpose of this report is to seek approval for a Net Zero Business Challenge Fund to
support local small to medium-sized businesses within North Lanarkshire to reduce their
environmental impact and improve the sustainability of their operations. Recent research
has highlighted one of the key barriers to small and medium-sized businesses achieving
net zero is finance. Utilising funding from the UK Shared Prosperity Fund enables North
Lanarkshire Council to support local businesses to reduce emissions through establishing
a Net Zero Business Challenge Fund. The Fund will ultimately help deliver on The Plan for
North Lanarkshire, North Lanarkshire’s Climate Plan ACT2030, and also the UK Shared
Prosperity Fund outputs and outcomes. 
Recommendations
It is recommended that the Enterprise and Fair Work Committee: 
(1) Approves the proposed use of UK Shared Prosperity Funding to support
businesses within North Lanarkshire to reduce their environmental impact and
enhance the sustainability of their operations by establishing a Net Zero Business
Challenge Fund. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (5) Grow and improve the sustainability and diversity of North
Lanarkshire's economy
Programme of Work Sustainable Futures
Item 4
Page 43 of 64

Page 44

1. Background 
1.1 The UK Shared Prosperity Fund (UKSPF) is a central pillar of the UK Government’s
levelling up agenda and succeeds the former EU funding received by the UK. Funding
of £2.6bn of capital and revenue has been put in place from April 2022 to March 2025
across the UK, with each lead authority receiving a direct allocation over the 3 financial
years. 
1.2 The key priorities of the UKSPF are to deliver pride in place and better life chances
through support for a range of strategic interventions across 3 key investment themes:
Communities and Place, Supporting Local Business and People and Skills, and a final
ring-fenced allocation to Multiply - an adult numeracy programme. 
1.3 The UKSPF Investment plan for Glasgow City Region was approved on 5th December
2022. Within that, North Lanarkshire’s UKSPF Investment Plan will receive an
allocation of £13,871,047 and will manage its distribution to projects across each of the
investment themes and throughout North Lanarkshire for the duration of the UKSPF. 
1.4 The UK Shared Prosperity Fund Investment Plan for North Lanarkshire was approved
at the Enterprise, Growth and Fair Work Committee in August 2022 with £250,000
allocated against the following Intervention:   
• S20: Support for expert business advice and support programmes at the local
and regional level, including support for decarbonisation, climate adaptation and
circular economy advice. 
1.5 To deliver on Intervention S20, this report proposes to establish a Net Zero Challenge
Fund that will enable North Lanarkshire Council to meet the outputs and outcomes
associated with its UK Shared Prosperity Fund allocation and support local businesses
to move towards decarbonising their business and operate in a more environmentally
sustainable manner. 
1.6 The Net Zero Business Challenge Fund will also complement the Energy Audit Voucher
Scheme that was approved by the Enterprise and Fair Work Committee in November
2022. The Energy Audit Vouchers provide North Lanarkshire-based small to medium-
sized businesses with up to £2,500 of financial support to undertake an energy audit to
identify how the business can reduce its energy bills. 
2. Report 
2.1 Tackling and preventing further climate change is important to us all. In 2019, North
Lanarkshire Council declared a Climate Emergency and set a target to reach net-zero
for North Lanarkshire by 2030. 
2.2 North Lanarkshire Council’s Climate Plan ACT2030 details how the council will respond
to the climate emergency and work towards achieving net zero emissions. The Climate
Plan highlights there are over 10,000 businesses operating in the area and each
generates carbon emissions through their use of buildings and transport as well as
industrial or farming processes.   
2.3 In 2022, a first of its kind survey of businesses from the United Nations-backed Small
to Medium Enterprise (SME) Climate Hub shows that SME businesses need additional
resources and guidance to reduce their carbon emissions. The SME Climate Hub
conducted a survey of 194 of their member businesses representing a sample of
Page 44 of 64

Page 45

companies around the world, and across sectors, size, and income. The most common
barrier to reducing emissions reported by companies was a lack of skills and knowledge
(63%), followed by funding (48%), and time (40%). In addition, only one-third of SMEs
have been offered a financial incentive to reduce emissions, with only 8% of SME
owners having received support from their banks. 
2.4 A more recent report from the Bank of Scotland, published in 2023, outlines 3 principal
barriers to SME businesses achieving net zero including finance, but also factors
around control, which centres around the difficulty in reducing emissions outside of their
own operations, and assessment, as it can be difficult to measure environmental
impact. To account for this, applicants to the Net Zero Business Challenge Fund will be
required to utilise the Energy Audit Voucher to assess any gaps in their knowledge and
assessment of their business’s environmental impact. Applicants will be able to
incorporate an Energy Audit Voucher as part of their Net Zero Business Challenge
Fund bid but this cannot be used as evidence of match funding. 
2.5 The proposal to establish a Net Zero Business Challenge Fund for North Lanarkshire
will offer local businesses the opportunity to address all three of the principal barriers
through a competitive application process. With a £250,000 budget, it is anticipated that
a minimum of 20 successful bidders could receive up to a maximum of £15,000 each
to help make their business more environmentally sustainable and/or reduce
emissions. The Fund will only be available to North Lanarkshire-based small to
medium-sized businesses. 
2.6 While match funding is not required, applicants will be made aware that value for money
is a key criterion in the assessment of applications and applicants are encouraged to
provide some match funding to support their application, this can be contributions from
the applicant organisation or external funding from another provider. Local Authority
funding from other grant schemes cannot be used as match funding. 
2.7 Projects must deliver activity that is line with the UKSPF Prospectus and The Plan for
North Lanarkshire and help identify a solution to reduce a company’s emissions or help
the business to trade more sustainably. Specifically, proposals should seek to deliver
either a step change in a business's ability to decarbonise their operations, trade in a
more climate-friendly way, and/or embeds circular economy principles into their
products, services, or operations. Some examples of proposals that will be considered
include: 
• Developing systems and/or processes for monitoring, quantifying, and reducing
carbon emissions. Workable solutions for ease in calculating carbon footprints
and carbon accounting.
• Developing sustainable, circular manufacturing models or remanufacturing
processes to minimise waste.
• Developing new products using recycled materials, repurposed materials,
minimising waste, or utilising waste from other industries.
• Developing new products and/or services that enable decarbonisation. This can
include products that already exist but are new to the applicant business or new
products designed to reduce carbon usage. 
• Enabling a business to undertake pilot work or prototype development for new
products and systems.
• Creating green jobs.  
• Creating training tools and courses or importing training into a business to
retrain or upskill staff to develop a workforce that operates as carbon neutral or
net zero. This may lead to new job roles or changes to existing staff roles. 
Page 45 of 64

Page 46

• Developing business systems and manufacturing processes that utilise
alternative, renewable energy sources. This may also include innovative
approaches to energy generation and storage.
• Developing innovative approaches to utilising degradable/biodegradable
materials or find alternatives raw materials or more efficient extraction
processes to redress the decline in valuable commodities (e.g. rare earth
metals).
• Developing innovative solutions for product packaging, to reduce waste and
promote environmental awareness.
• Development of new innovative business solutions to address the impacts of
climate change. 
2.8 The fund will be administered by North Lanarkshire Council staff and companies will be
invited to apply with all applications adhering to a set deadline. Applicants must explain
in their application how they have estimated each of the outputs and results for their
project, demonstrating clearly how each of the proposed outputs and results link to their
specific project activities and objectives. An example of outputs and outcomes by
intervention is listed in Table 1 below, with S20 detailing those which are mandatory to
report as part of the UK Shared Prosperity Fund. 
Table 1: Summary of Outputs and Outcomes by Intervention 
Intervention Outputs Outcomes
Support for North
Lanarkshire
businesses to
develop new
business models,
new products, new
circular
manufacturing
processes, retrain or
upskill staff for
create new roles in
sustainability.
• Increase in revenue.
• Creation of green jobs
• Demonstrating North
Lanarkshire’s business
community’s ability to
innovate
• Understanding of carbon
accounting and
monitoring
• Creation of carbon
reduction plans
• Increased number of
businesses operating as
carbon neutral or net
zero
• Raise awareness of the
advantages of circular
businesses models and
circular manufacturing
• Demonstrate reductions
in carbon footprint and
proactive approach to
reaching North
Lanarkshire and
Scotland’s Net Zero
targets
S20: Support for
expert business
advice and support
programmes at the
local and regional
level, including
support for
decarbonisation,
climate adaptation
and circular
economy advice. 
• Number of enterprises
receiving grants
• Adoption of new to the
firm technologies or
processes 
2.9 Applications will be assessed against a range of criteria, such as how the proposal will
benefit North Lanarkshire by supporting the delivery of existing plans and policies; the
outputs and outcomes it will deliver for the business; deliverability of the project, and
Page 46 of 64

Page 47

how the business will be more environmentally sustainable as a result of the award. An
assessment panel will then score applications with those scoring highest awarded
funds from the Challenge Fund. The assessment panel will comprise representatives
from North Lanarkshire Council and relevant stakeholders from, for example, Scottish
Enterprise’s Sustainability Team or Zero Waste Scotland. In selecting the proposals to
be funded priority will be given to those that have the greatest potential to deliver
against key local growth priorities such as The Plan for North Lanarkshire; the
Economic Regeneration Delivery Plan (ERDP); Active Travel Strategy; and North
Lanarkshire’s Climate Plan ACT2030.   
2.10 It is proposed the Net Zero Business Challenge Fund will by launched by the end of
February 2024 and a first call for applications would look to close towards the end of
March 2024. Should there be any underspend further funding rounds may be launched
but this will be dependent on any funding remaining from each subsequent call. 
2.11 Following acceptance of the grant award in April 2024, businesses would have until
31st March 2025 to complete their project. Successful applicants will be required to sign
a Grant Offer Letter from North Lanarkshire Council which will include several
stipulations relating to monitoring and evaluation of the project and funds can only be
paid out retrospectively once eligible project costs have been incurred. Applicants must
also commit to providing outputs and outcomes one year following conclusion of the
fund. 
3. Measures of success 
3.1  A range of key performance measures will be in place for the Net Zero Business
Challenge Fund. These will include: 
• Reduction in CO2 emissions
• Investment by businesses to support net zero project (match funding)
• Number of businesses adopting new to the firm technologies or processes
• Number of jobs created.
• Number of jobs safeguarded.
• Number of grants awarded.
• Value of grants awarded.   
4. Supporting documentation 
4.1 None 
Pamela Humphries
Chief Officer (Place) 
Page 47 of 64

Page 48

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
£250,000 of funding has been secured from the UK Shared Prosperity Fund for the
establishment of net zero support for businesses in 2024/25. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 48 of 64

Page 49

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Net Zero Business Challenge Fund will support local businesses to reduce
their own emissions and/or improve the environmental sustainability of their
operations, products, or services. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Ongoing marketing and communications is essential for the delivery of the
Challenge Fund. The Corporate Communications and Marketing Team will be
actively involved and engaged in the delivery of the Challenge Fund. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Risks are managed in accordance with the council’s agreed Risk Management
Strategy to ensure that risks are managed at the appropriate level. There are no
significant organisational risks associated with the Net Zero Business Challenge
Fund. Key risks will be recorded through a project risk register that reports to North
Lanarkshire Councils UK Shared Prosperity Fund Board. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☒ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 49 of 64

Page 50

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 50 of 64

Page 51

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☒ Yes ☐ No
Ref: PH/LN Date: 16 February 2024 
Contract Award for East Airdrie Link Road Stage 3 (Preliminary Design
and Planning) 
From  Pamela Humphries, Chief Officer (Place) 
E-mail noblely@northlan.gov.uk  Telephone: Lyndsay Noble, City Deal
Manager, 07970 016256 
Executive Summary
The Committee is asked to approve the award of a contract for Professional Service for Stage 3
(Preliminary Design and Planning) for the East Airdrie Link Road Project (the ‘Contract’) to
AtkinRéalis UK Limited. 
This procurement recommendation follows the completion of a procurement exercise, where the
successful tender has been evaluated as providing the most economically advantageous tender in
terms of cost and quality for the council. 
The Contract is for a period of 16 months anticipated to commence on 18 March 2024. 
The value of the Agreement is two million, eight hundred ninety-four thousand eight hundred and
seventy-one Pounds Sterling (£2,894,871.00) exclusive of VAT. 
The Contract will support the delivery of the North Lanarkshire Council City Deal East Airdrie Link
Road Project. 
Recommendations 
It is recommended that the Committee: 
(1) Approves the award of the East Airdrie Link Road Stage 3 (Preliminary Design and Planning)
Professional Contract to AtkinRéalis UK Limited at the value of two million, eight hundred
ninety-four thousand eight hundred and seventy-one Pounds Sterling (£2,894,871.00)
exclusive of VAT. 
The Plan for North Lanarkshire
Priority   Improve economic opportunities and outcomes 
Ambition statement  (5) Grow and improve the sustainability and diversity of North
Lanarkshire's economy 
Programme of Work  Transforming Places 
Item 5
Page 51 of 64

Page 52

1. Background 
1.1 The East Airdrie Link Road is a key City Deal infrastructure project and is the northern section
of the Pan Lanarkshire Orbital Transport Corridor which forms an important north south
strategic link between the M74 and the M80.  The project will provide a new single
carriageway road east of Airdrie, between the M8 and the A73 south of Cumbernauld. It will
also deliver a separate north-south route for walking, cycling, and wheeling focusing on the
A73 linking local communities to key destinations, offering local and strategic routes.
Critically, the proposed link road will also provide access to the New Monklands Hospital at
Wester Moffat, Airdrie. 
1.2 In line with earlier Committee reports and approvals, the procurement is for professional
services for the development of the preliminary design for the link road and preparation of
the planning application with supporting documents including an Environmental Impact
Assessment. 
1.3 As previously reported to Committee, the programme for the development and delivery of the
EALR has been reviewed. This is to accommodate complex design and planning
requirements, to allow for technical approvals and implementation of the land acquisition
strategy. In moving into DMRB Stage 3, the programme can progress at pace and further
consultation will take place with key stakeholders including Members, local communities and
residents. 
1.4 This multidisciplinary professional services contract has been procured to further develop
proposals to deliver the East Airdrie Link Road. The Contract will specifically progress the
Project through Preliminary Design and submission of a Planning Application. Through the
development of the preliminary design, the road alignment will be fixed, structures and links
to the local network will be agreed and land take understood to inform the land strategy to
deliver the link road.   
2. Report 
2.1 An internal user intelligence group of technical and procurement representatives was formed
to review technical specifications, trading processes, market conditions and trends, ways to
maximise community benefits and sustainability and to agree the contract strategy that would
deliver maximum benefit for the council via the Contract. 
2.2 The initial estimated value of the Contract dictated that the procurement procedure be
undertaken in accordance with the Public Contracts (Scotland) Regulations 2015. 
2.3 The procurement procedure therefore was undertaken from the Scotland Excel framework
agreement for Engineering and Technical Consultancy Services 0820 Framework Agreement
(the “Framework Agreement”) with Lot 1 Roads and Structures being specifically used.   
2.4 Invitation to Tender documentation was issued to companies appointed to the Framework
Agreement following a capability and capacity enquiry and the approval of a Contract
Strategy. The council received 6 tender submissions. 
2.5 Following the completion of the procurement procedure, AtkinRéalis UK Limited has been
evaluated as demonstrating Best Value for the council. 
Page 52 of 64

Page 53

2.6 Appendix 1 confirms the scoring achieved by each tenderer, further details of the
procurement procedure are provided in Appendix 2 and the SME status and location of all
tenderers is located within Appendix 3. 
Financial / Budget Consideration 
2.7 Following completion of the procurement procedure, the value of the Contract to be awarded
is two million, eight hundred ninety-four thousand eight hundred and seventy-one Pounds
Sterling (£2,894,871.00) exclusive of VAT. 
2.8 The costs associated with delivery of the Contract will be contained within the North
Lanarkshire Council City Deal Programme budget which combines capital funding from UK
and Scottish Governments and Member Authorities.   
Price Stability 
2.9 The pricing mechanism is a Priced Contract with a robust Scope of Services and an agreed
Activity Schedule offering a good level of cost certainty. 
Community Benefits 
2.10 The council is committed to maximising the delivery of community benefits. The procurement
included a community benefit requirement, this approach is designed to deliver local
community benefits where possible and has been carried out in line the Glasgow City Region
City Deal Community Benefit Strategy. The Community Benefits will be delivered through the
design, and planning phases. The community benefits menu within the City Deal Community
Benefits Strategy has been used to target benefits that support the council’s key aims and
objectives and deliver against priorities.   
2.11 Within their tender, AtkinRéalis UK Limited committed to deliver the following community
benefits within the Contract:  
Community Benefit Type Quantity
Committed
EMP01 New Employee Full Time Job (from Priority Group) 1
EMP06 New Entrant Graduate - Full Time (from Priority Group) 1
SKL03 Work Experience Placement - Foundation Apprenticeship – Civil
Engineering, placements to take place in June 24 and / or Oct 24 4
SKL06 Work Experience Placement - Non School 4
SKL10 Work Experience Summer Placement 2
SKL11 Primary School Engagement (mini careers event for P6 / P7) QTR 1 24/25 1
SKL12 Careers Event (Virtual Teams Session) Scottish Apprenticeship Week
(SAW) in March 24 1
COM02 Non-financial support for a community project (Minimum 7 hours). 2 
Page 53 of 64

Page 54

Fair Work First  
2.12 All consultants appointed to the Scotland Excel Engineering and Technical Consultancy
Framework have evidenced Fair Work practices and demonstrated how they will promote
them in the delivery of contract call-offs from the Framework. 
Contract Management 
2.13 Officers from both the City Deal Team and Infrastructure and Design Team in Place will be
responsible for managing the Contract which will be undertaken in accordance with the
contract and supplier management conditions applied within the Contract. 
3. Measures of success 
3.1  The Contract will deliver the following outcomes: 
• Preliminary Design for the East Airdrie Link Road 
• Route alignment 
• Stage 3 Assessment 
• Stakeholder consultation and Engagement Plan 
• Whole life costings
• Planning Application 
3.2 The Contract will facilitate the delivery of strategic road infrastructure to enable forming an
important part of the Pan Lanarkshire Transport Corridor and will significantly improve north
and south connectivity facilitating the realisation of associated economic benefits.  The
contract also contributes to enabling the development of Monklands Replacement Hospital
at Wester Moffat, Airdrie. 
4. Supporting documents 
4.1 Appendix 1 Summary of Tender Evaluation Process 
Appendix 2 Summary of Procurement Process 
Appendix 3 SME Status and Location of All Tenderers 
Pamela Humphries 
Chief Officer (Place)  
Page 54 of 64

Page 55

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
An Equality Impact Assessment has been carried out for the East Airdrie Link Road
project and will be further developed and integrated into the preliminary Design.   
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The cost of this procurement will be met from the City Deal Programme, which combines
capital funding from UK and Scottish Governments and Member Authorities.   
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐  
If Yes, please provide a brief summary of the impact? 
The City Deal Team work closely with Legal Services on all sub projects focusing on land
acquisition and CPO, procurement and contract preparation and management, funding
agreements and any other related matters. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data? 
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-mailed
to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
Page 55 of 64

Page 56

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi? 
Yes ☒ No ☒ 
If Yes, please provide a brief summary of the impact? 
The East Airdrie Link Road will make provision for digital connectivity as part of the
preliminary Design.   
The council’s Digital Partner, CommsWorld has been identified as a stakeholder within
the Scope of this Contract and there is a requirement that the consultants will engage
with CommsWorld to ensure Digital connectivity is integrated into the preliminary design
for the Link Road and that in partnership that innovation and contributions to digital
transformation is identified and enabled as part of this stage of the East Airdrie Link
Road. 
There may also opportunities for the Link Road to support the Digital Strategy of the
Monklands Replacement Hospital.  Through liaison with NLC, CommsWorld and NHS
Lanarkshire any opportunities will be explored and where appropriate integrated into this
design stage of the Link Road.   
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
All infrastructure projects developed by the council as part of the GCR City Deal will be
subject to relevant environmental and sustainability appraisal and as part of the design
process and subsequent planning application approvals and procurement. Furthermore,
to adhere with HM Treasury Greenbook best practice, each iteration of project business
case seeking GCR City Deal funding will include a review of the sustainability
considerations, this will include carbon management, involving categorisation,
assessment and mitigation. 
Within the Scope of Services relevant environmental appraisals will be carried out
particularly in the form of an Environmental Impact Assessment to inform the preliminary
design and environmental mitigation including landscape, contamination, ground
conditions, energy, materials, waste and will support the submission of a full Planning
Application for the Link Road. 
As part of the requirements of the contract, a carbon management plan will be developed
to identify the impacts and set out an action plan for appropriate mitigation over the life of
the Link Road. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Page 56 of 64

Page 57

The City Deal programme and the delivery of the East Airdrie Link Road will continue to
be promoted through Corporate Communications and the Glasgow City Region’s
Communications team. 
Specific to the East Airdrie Link Road, a joint communication plan will also be developed
with NHS Lanarkshire and North Lanarkshire Council to coordinate communication,
stakeholder engagement and promote the projects as they develop. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts, highlighting
where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk
Registers), and how they are managed? 
Risk management of North Lanarkshire’s City Deal activity is incorporated within the
council’s City Deal programme risk register which is reviewed by the City Deal Manager
and reported to the council’s City Deal and Ravenscraig Steering Group. The City Deal
risks are also integrated in the Place Service Risk Register. 
The East Airdrie Link Road has a detail risk register and is managed by the Project
Manager.   
A joint Risk Register has been developed with NHS Lanarkshire to identify partner risks,
common and shared risks and agree on mitigation and risk ownership.  This will be
reported and managed by the NLS/NHS Lanarkshire Project Interface Board over the
lifespan of the two projects. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does
it relate to healthcare, housing, or education services for in-Service or ex-Service
personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to ensure
there has been appropriate consideration of the particular needs of the Armed Forces
community to make sure that they do not face disadvantage compared to other citizens in
the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service delivery,
policy, or plan that has an impact on children and young people up to the age of 18, or on
a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles from the
United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been carried
out? 
Yes ☐ No ☒ 
Page 57 of 64

Page 58

Appendix 1 – Summary of Tender Evaluation Process 
Final
Rank Tenderer Name Total Tender
Score (%)
Recommended
for Award      
(Yes / No)
1 AtkinRéalis UK Limited  83.89%  Yes
2 Stantec Uk Limited   76.58% No
3 Amey OW Limited   72.00% No
4 Sweco UK ltd   61.99% No
5 Mott MacDonald   55.05% No
/ Aecom Limited 
Failed to
meet pass
mark
No                 
Page 58 of 64

Page 59

Appendix 2 – Summary of Procurement Process 
Response
CPT Contract Reference Allocated: NLC-SLP-23-011
Procurement Procedure Utilised: Call off via a mini competition from existing
Framework 
Governing Legislation / Regulations: Public Contracts (Scotland) Regulations 2015
Date Contract Strategy Approved: 03 July 2023
Framework / DPS Owner: Scotland Excel 
Framework / DPS Title: Scotland Excel Engineering and Technical
Consultancy Services Framework 
Framework / DPS Reference Number: Ref 0820
Lot Reference / Title: Lot 1 Roads and Structures 
Companies Appointed to Framework / Lot: 14
Number of Companies Invited to Take Part: 14
Date ITT Published: 13 July 2023
Tender Platform Utilised: PCS-Tender (PCST)
Tender Return Deadline: 27 September 2023 
Number of Tenders Received: 6
Tenders from SME’s: 6
Tenders from NLC Based Tenderers:  1
Tenders from Supported Businesses: 0
Number of Non−compliant Tenders: 1
Number of Compliant Tenders: 5
Number of Recommended Tenderers: 1
Basis of Award: Quality: 70% Price: 30%
Evaluation Team: NLC Enterprise Projects team and Infrastructure and
Design team. 
Anticipated Start Date of the Agreement: 18 March 2024
Total Agreement Period (Months): 16 months 
Awarded Value of the Agreement:
Two million, eight hundred ninety-four thousand
eight hundred and seventy-one Pounds Sterling
(£2,894,871.00) exclusive of VAT.  
Page 59 of 64

Page 60

Appendix 3 – SME Status and location of all Tenderers 
Name of Tenderer
Size of Tendering
Organisation
(Micro, Small,
Medium or Large)
Location
(Local Authority /
Council Area)
AtkinRéalis UK Limited  Large Edinburgh
Stantec Uk Limited  Large Glasgow 
Amey OW Limited  Large North Lanarkshire 
Sweco UK ltd  Large Glasgow 
Mott MacDonald  Large Edinburgh
Aecom Limited  Large Edinburgh 
Page 60 of 64

Page 61

Contracts awarded below Committee approval threshold
North Lanarkshire Council
Report 
Does this report require to be approved? ☐ Yes  ☒ No
Ref JMcK/CPT Date 16/02/24 
From James McKinstry - Chief Officer (Assets and Procurement)
E-mail McKinstryJ@northlan.gov.uk Telephone 07939 281 102 
Executive Summary
In accordance with the Council’s General Contract Standing Orders (“GCSOs”), GCSO
21.10 requires a summary report be presented to members with details of contracts
awarded since last committee, specifically for the spend range: 
• over £50,000 but below £500,000 for supplies or services; and,
• over £500,000 but below £2,000,000 for works. 
Recommendations
It is recommended that the Enterprise and Fair Work Committee:
(1) Acknowledge the contract awards made since last committee reporting cycle. 
The Plan for North Lanarkshire
Priority All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Enterprise and Fair Work Committee
Item 6
Page 61 of 64

Page 62

1. Background 
1.1 The Local Government (Scotland) Act 1973 section 81 requires local authorities to
“…make standing orders with respect to the making by them or on their behalf of
contracts for the supply of goods or materials or for the execution of works.”.
1.2 The Council’s General Contract Standing Orders (“GCSOs”) set out the council’s
specific procurement procedures and responsibilities at all spend levels, and include
the reporting requirements of procurement activity, including contracts awards, to
committee for either approval or acknowledgement. 
2. Report
2.1 In accordance with GCSO 21.10, this report summarises the contract awards since last
committee, specifically for the spend range:
• over £50,000 but below £500,000 for supplies or services; and,
• over £500,000 but below £2,000,000 for works. 
2.2 If you require further information regards the contract awards reported, please refer to
the lead service area / Chief Officer detailed in the appendix. 
3. Measures of success
3.1 All requirements contracted contribute to either the council’s programme of work and/or
fulfil a statutory requirement.
3.2 All contract awards secure best value for the council in accordance with their evaluation
criteria. 
3.3 All necessary diligence has been undertaken in the evaluation and appointment of
contractors. 
3.4 All contract awards are logged in the council’s contract register. 
4. Supporting documentation
4.1 Appendix 1 – Summary of contracts awarded. 
James McKinstry
Chief Officer (Assets and Procurement) 
5. Impacts 
5.1 Impacts considered as part of the contract award procedures are recorded in the
individual contract award reports held by the lead service area.
Page 62 of 64

Page 63

Appendix 1 – Summary of Contracts Awarded 
Contract Ref NLC-CPT-23-031
Title Targeted entrepreneurial support for Black and Minority Ethnic Groups (BAME)
Classification Services - Standard
Lead Service Area / Chief Officer Pamela Humphries, Chief Officer (Place)
Competition Governance Lower Threshold Regulations - The Procurement Reform (Scotland) Act 2014
Procurement Route Single Stage
No. of Expressions of interest 25
No. of Bids Received 6
Award Criteria Most Economically Advantageous Tender
Evaluation Score – Successful 78.61%
Evaluation Scores – Unsuccessful 78.17% to 58.99%
Comments Tender evaluation was conducted by officers with subject matter expertise
Award
Details
Value £155,362
Contract Duration 15 months
Contractor Name Asian Business Chamber Limited
Contractor Size Micro
Contractor Location Cumbernauld, North Lanarkshire
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? No
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer Scotland
Duty ☐
HR Policy Impact ☐ Data Protection Impact ☐ Environment / Carbon
Impact ☐
Risk Impact ☒ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☐
Communications Impact
☐
Armed Forces Covenant
Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer 
Page 63 of 64

Page 64

Page 64 of 64