Page 1

8 November 2023 
Members of the 
Enterprise and Fair Work Committee
Chief Executive’s Office
Archie Aitken
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk 
Notice is given that a Meeting of the Enterprise and Fair Work Committee is to be held in
the Council Chamber, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on Friday, 17
November 2023 at 10:00 AM which you are requested to attend. 
The agenda of business is attached. 
Archie Aitken
Chief Officer (Legal & Democratic) 
Members : 
Clerk Name: Clare Louise McDonald
Clerk Telephone: 01698 302190
Clerk Email: mcdonaldcl@northlan.gov.uk
A McVey, F McKay, A Bustard, D Crichton, P Di Mascio, K Docherty, K Duffy, H Dunbar, W
Goldie, L Jarvie, A Khan, K Larson, J Leckie, J Logue, F MacGregor, A Masterton, A
McCrory, M McPake, L Nolan, L Roarty, G Robinson, R Sullivan, J Toner, S Watson, C
Williams.
Page 1 of 312

Page 2

Page 2 of 312

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical Standards
In Public Life Etc. (Scotland) Act 2000   
Operational   
2 City Deal Programme Update
Submit report by the Chief Officer (Place) providing an update
on the current status of North Lanarkshire City Deal
Infrastructure Programme subprojects (copy herewith) 
5 - 14 
3 Town Action Plans Update
Submit report by the Chief Officer (Place) providing an update
on the progress made on the development of North
Lanarkshire's Town Visions Action Plans (copy herewith) 
15 -
156 
4 Renewal of Fair Trade Zone - Community Status for North
Lanarkshire
Submit report by the Chief Officer (Place) informing of the
activities of the North Lanarkshire Fair Trade Zone and
associated Steering Group since its approval in February
2020 (copy herewith) 
157 -
192 
5 Environmental Key Fund (EKF) Update
Submit report by the Chief Officer (Place) providing an update
on the Environmental Key Fund (copy herewith) 
193 -
202 
6 North Lanarkshire Industries
Submit report by the Chief Officer (Education - South)
outlining the impact of the pandemic on the capacity of North
Lanarkshire Industries, the actions taken during the period
and also the recovery to deliver its range of services and
contracts (copy herewith) 
203 -
208 
7 Routes to Work Ltd - Appointment of Category B
Directors
Submit report by the Chief Officer (Education - South) seeking
approval for the appointment of three new Category B
directors to Routes to Work Limited and proposing
amendments to its Articles of Association (copy herewith) 
209 -
216 
8 Fusion Assets Limited - Proposed Revisions to Articles
of Association
Submit report by the Chief Officer (Business and Digital)
setting out proposed revisions to the Articles of Association for
Fusion Assets Limited (copy herewith) 
217 -
254
Page 3 of 312

Page 4

Performance   
9 Strategic Performance Framework - latest performance
results for Employability
Submit report by the Chief Officer (Education - South)
highlighting the strategic performance framework within
Employability for Quarter 1 2023/24 (copy herewith) 
255 -
264 
10  Strategic Performance Framework - latest performance
results for Place
Submit report by the Chief Officer (Place) highlighting the
2022/23 year end performance and the 2023/24 year to date
performance of the Place Service in relation to the
performance indicators (copy herewith) 
265 -
274 
11  Routes to Work Ltd - Performance and Finance Report
Submit report by the Chief Officer (Education - South)
outlining Routes to Work Ltd's performance against its
charitable objectives and Council priorities and financial
performance for Quarter 4 2022/23 to Quarter 1 2023/24
(copy herewith) 
275 -
292 
12  Fusion Assets Limited – Performance Monitoring Report
to 30 June 2023
Submit report by the Chief Officer (Place) providing details of
Fusion Assets Ltd operational performance during 2023/24
and financial performance up to 30 June 2023 (copy herewith) 
293 -
308  
Contracts   
13  Contracts awarded below committee approval threshold
Submit report by the Chief Officer (Assets and Procurement)
advising of contracts awarded below Committee approval
threshold since the last meeting of the Committee (copy
herewith) 
309 -
312 
Page 4 of 312

Page 5

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    LN/PH Date 17/11/23 
City Deal Programme Update 
From  Pamela Humphries, Chief Officer (Place)  
E-mail NobleLy@northlan.gov.uk Telephone Lyndsay Noble
07970016256 
Executive Summary 
The North Lanarkshire City Deal Programme Update Report seeks to inform the Enterprise
and Fair Work Committee of the current status of North Lanarkshire City Deal Infrastructure
Programme subprojects.     
This report also seeks the agreement of Committee to submit the East Airdrie Link Road
(EALR) Outline Business Case (OBC) to the Glasgow City Region Cabinet for Approval in
February 2024. The approval of the OBC would allow for a significant governance
milestone to be met and for the project to proceed to Full Business Case, enabling
substantial drawdown of City Deal Funding.   
Recommendations
It is recommended that the Enterprise and Fair Work Committee: 
1)  Acknowledge the status and recent progress of North Lanarkshire City Deal
infrastructure subprojects. 
2) Agree to the submission of the East Airdrie Link Road Outline Business Case to the
Glasgow City Region Cabinet for Approval in February 2024. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (5) Grow and improve the sustainability and diversity of North
Lanarkshire's economy
Programme of Work Transforming Places
Item 2
Page 5 of 312

Page 6

1. Background 
1.1 The Glasgow City Region (GCR) City Deal is an agreement between the UK and
Scottish Governments and the eight GCR Local Authorities, with the sole focus of
creating additional economic growth.  The 20-year GCR Deal was accepted by GCR
Council Leaders on 20 August 2014 and incorporated: 
• implementing a £1.13bn Infrastructure Fund to improve the regional transport
network, regenerate sites for economic use and improve public transport
provision;
• supporting growth in the life sciences sector;
• helping small and medium enterprises to grow and develop;
• establishing programmes to support the unemployed; and 
• piloting new ways of boosting the incomes of low wage employees.   
1.2 The City Deal programme for North Lanarkshire as part of the Infrastructure Fund
comprises the following projects:
• A8/M8 Corridor Access Improvements
o Strategic Active Travel 
o Orchard farm Roundabout
• Glenboig Link Road (complete)
• Pan-Lan Orbital Transport Corridor
o East Airdrie Link Road
o Ravenscraig Access Infrastructure
o Motherwell Town Centre Transport Interchange (complete) 
2. Report 
2.1 Motherwell Town Centre Transport Interchange 
2.1.1 The Motherwell Town Centre Transport Interchange project, comprising Motherwell
Station and Muir Street improvements, is complete and performing well as an
integrated transport hub. The Station has undergone transformational change with the
improvements providing a high quality experience for rail passengers and railway
employees at Motherwell. Transport and public realm investment at Muir Street, led by
the council, complements, and supports the major investment in Motherwell Rail
Station, providing a new access road to the station and new taxi rank, expanded bus
stop capacity on Muir Street and public realm improvements.   
2.1.2 Together, the Station investment and Muir Street improvements have created a
sustainable transport hub in the heart of Motherwell. This provides an improved
gateway into Motherwell and the Glasgow City Region by public transport and forms a
key part of regeneration plans for Motherwell town centre. 
2.1.3 The Partnership between Scotrail, NLC, SPT and Transport Scotland in delivering the
joint project has been a success and is now driving forward related active travel projects
to connect Motherwell Rail Station and surrounding communities to leisure facilities,
employment and training opportunities at Strathclyde Country Park, Braidhurst
Industrial Estate, Ravenscraig and local services in Motherwell. 
2.1.4  Whilst the Muir Street contract works are complete and the new facilities are now open
and in use, there are some defects which require to be rectified by the contractor on
Page 6 of 312

Page 7

sections of the public realm and surfaced areas of Muir Street.  Once the timing and
duration of the rectification works has been agreed with the contractor this will be
communicated to local members, stakeholders, local businesses and residents. 
2.2  Ravenscraig Access Infrastructure 
2.2.1  The Ravenscraig Access Infrastructure project comprises three projects:
• a new road connection between Motherwell and Ravenscraig from Airbles Road,
passing under the West Coast Main Line railway, and on to the Regional Sports
Facility 
• completing the dualling of Airbles Road between Airbles Farm Road and Hamilton
Road and improving facilities for pedestrians and cyclists  
• upgrading the A723 for three kilometres from the New Craig Road junction at
Ravenscraig to the M8 at Holytown to create a dual carriageway and shared
footway/cycleway
2.2.2  In respect of the connection between Motherwell and Ravenscraig from Airbles Road,  
the first phase of works has now been completed with all works to complete the under
bridge crossing the WCML and to fully reinstate the railway finishing in September. The
council has been working with Network Rail to finalise the long-term agreements for the
future management and maintenance of the bridge. 
2.2.3   The remaining land required for the connection from Motherwell into Ravenscraig has
now been acquired under the Compulsory Purchase Order.  Advance works have taken
place to divert some public utilities around the Windmillhill Street / Airbles Road
roundabout and further works will be undertaken during late 2023 and early 2024. 
2.2.4   A revised procurement strategy for the development of the new road between
Windmillhill Street and the Ravenscraig Sports Facility has been developed.  The initial
phase of work will include the demolition of the buildings acquired for the scheme – at
Manse Road (formerly Cook & Indis and Yesss Electrical), the existing Evans Halshaw
dealership and the adjacent vacant commercial unit. Following tender award and
building warrant, works are expected to commence in early 2024. A later contract will
be published in early 2024 for advance groundworks within the Ravenscraig site itself.
The final phase of works will be for the construction of the road and associated works. 
The phasing of the works packages will allow time for further consideration of a wider
strategic and local drainage strategy to potentially help support further works to improve
the drainage network in the vicinity, which is significantly constrained and may inhibit
future redevelopment and regeneration of council and other sites. 
2.2.5   The advancement of the discrete demolition contract and a subsequent groundworks
contract will assist in maintaining progress and in de-risking the later main contract
works. 
2.2.6  Related to this part of the project, works have progressed well for the relocation of the
Evans Halshaw Ford car dealership with the construction of the new premises on the
nearby former Taggarts site progressing well. The main works will be complete in early
November as initially programmed however due to delays in works by public utility
providers, the opening of the dealership, and its relocation from the existing premises,
will be delayed to December.
2.2.7  It is anticipated that detailed design and supporting technical specifications will be
completed in early Summer 2024 for the dualling of the A723 from Ravenscraig to the
M8 at Holytown.  
Page 7 of 312

Page 8

2.3  East Airdrie Link Road 
2.3.1   As Committee is aware, the East Airdrie Link Road (EALR) will provide a new strategic
link between the M8 and south Cumbernauld.  The proposed link road will also provide
access to the New Monklands Hospital at Wester Moffat, Airdrie.  During DMRB Stage
2, the preferred route was amended and realigned accordingly to accommodate the
proposed Hospital site following the selection of the Wester Moffat site. The Scottish
Government approved The Monklands Replacement Project (MRP) Outline Business
Case in July 2023 and subsequently, NHS Lanarkshire (NHS L) submitted a planning
application to North Lanarkshire Council in early August 2023.  NHS L have appointed
Laing O’Rourke as their preferred contractor who will work alongside their design team
to progress the detailed design and project to Final Business Case.   
2.3.2  The EALR project team continue to liaise with NHS L through regular technical
meetings.  A Project Interface Board has been established to ensure coordination,
manage risk, secure efficiencies, and maximise benefits.  There are however a number
of significant risks and challenges for both the EALR and MRP projects around ground
conditions, technical consents, ecological constraints and land ownership.  There are
also real challenges for both, concerning management of programme, physical overlap
of works and construction access.   It has been highlighted to NHS L that sole reliance
on the EALR may present a risk to the Hospital Programme given the complexities of
the Link Road. 
2.3.3   In line with previous Committee approvals, the procurement for professional services
for the development of the preliminary design for the link road and preparation of the
planning application is nearing completion. The Design Manual for Roads and Bridges
(DMRB) Stage 3 procurement is in the final stages of evaluation and to maintain
programme it is likely that the contract will need to be awarded under delegated
authority by the Deputy Chief Executive in accordance with general Contract Standing
Orders, with the outcome reported to the next Committee. 
2.3.4   As previously reported to Committee, the programme for the development and delivery
of the EALR has been reviewed.  This is to accommodate complex design and planning
requirements and to allow for technical approvals and implementation of the land
acquisition strategy.  In moving into DMRB Stage 3 (subject to approval), the
programme can progress at pace and further consultation will take place with key
stakeholders including local communities and residents.   
2.3.5   To secure approval to move forward with the EALR project and to release the next
tranche of City Deal Funding, it is intended that an Outline Business Case (OBC) is
submitted to the GCR Cabinet in February 2024.  The OBC is in development and
requires to be submitted to the GCR Project Management Office for assessment in late
December 2023.  The Committee is therefore asked to agree the submission of the
EALR OBC to the Glasgow City Region for approval.  The OBC is based on the EALR
being both critical to the Pan Lanarkshire Orbital Transport Corridor and for the opening
and operation of the Monklands Replacement Hospital.   
2.4 Orchard Farm Roundabout 
2.4.1 The ‘A8/M8 Corridor Access Improvements’ Outline Business Case (OBC) including
the Orchard Farm Roundabout was approved by the GCR Cabinet on 30 August 2022. 
As reported, the scope of the Orchard Farm Roundabout project comprises a financial
contribution of £2m to the developer for the construction of the junction on the A8. 
Page 8 of 312

Page 9

2.4.2  The Orchard Farm Roundabout is a new junction on the A8 All Purpose Distributor
Road and critically supports the development of the Mossend International Rail Freight
Park (MIRP) and provides important access to a number of development sites to the
north of the A8/M8.   
2.4.3  The proposed Full Business Case (FBC) for the new junction will be underpinned by a
funding agreement between the council and the developer/s and will establish funding
arrangements, obligations and key milestones.  The remainder of the costs and any
associated delivery risks relating to the delivery of the infrastructure will be met by the
developer/s.  The infrastructure will form part of the strategic road network and will fall
under the responsibility of Transport Scotland.   
2.4.4   It is proposed to submit the FBC for the Orchard Farm Roundabout for approval to the
GCR Chief Executive’s Group in Summer 2024, subject to sufficient procurement
progress by the developers.  The FBC will report on the procurement outcome of the
new junction and associated works and is the final stage in the funding approvals to
allow for contract award and the delivery of the infrastructure.  Agreement will be sought
from Committee to submit the FBC to the GCR Chief Executives Group for approval in
due course.  This would allow for works to commence in late Autumn 2024, with the
intention that the works would be complete by late 2024. 
2.5 A8/M8 Corridor Strategic Active Travel 
2.5.1 The provision of Strategic Active Travel Links, connecting Eurocentral/Maxim Office
Park/Newhouse and Mossend to surrounding local communities and local rail stations
was approved by GCR Cabinet on 30 August 2022 as the new preferred option for the
Eurocentral sub-project.   
2.5.2 The routes identified are to the south of Eurocentral between Bellshill Rail Station/town
centre and the M8 cycle route at North Road; Bellshill town centre, Mossend and
Holytown, connecting into Eurocentral from Holytown and between Holytown and
Newhouse. To the north of Eurocentral, a route has also been identified from Whifflet
rail station to the M8 cycle route at Shawhead. These routes are designated as
Strategic Network Routes within the North Lanarkshire Active Travel Strategy. 
2.5.3 In total, it is aimed to deliver 10km of shared use walking and cycling routes with City
Deal investment. The routes link with other planned active travel route improvements
as part of the Ravenscraig Infrastructure Access and East Airdrie Link Road projects
and with other projects being developed by the Infrastructure and Transportation team.
There are also opportunities to seek match funding from other external funding sources
to expand the scope of the project to connect more communities to employment
opportunities. 
2.5.4 Due to the scale of the project, a phased approach will be taken to design and delivery.
Consultants have been appointed to progress options appraisal, consultation and
concept design work for the first phase of the project, focussing on the route into
Eurocentral from Holytown. It is planned to coordinate consultation activities with work
being led by Architecture and Design Scotland on the Holytown Climate Action Town
project.  Concept design work is also progressing on the Newhouse to Holytown and
Whifflet Corridor routes. Detailed design work will be progressed over 2024 with it then
intended, subject to Committee agreement, to submit a sub-project Full Business Case
in Winter 2024 and commence construction work in 2025. 
Page 9 of 312

Page 10

3. Measures of success 
3.1  The North Lanarkshire City Deal Programme construction timescales are as follows
(construction only): 
Glenboig/Gartcosh Community Growth Area: 
• Glenboig Link Road – May 2017 to June 2018 (complete) 
Pan Lanarkshire Orbital Transport Corridor: 
• Muir Street – January 2022 to June 2023 (complete) 
• Ravenscraig Access Infrastructure – March 2022 to December 2026 (delivered in
4 phases). 
• East Airdrie Link Road – Sept 2027 to Sept 2030 
A8/M8 Transport Corridor: 
• Orchard Farm Roundabout – Sept 24 to October 25 
• Eurocentral Strategic Active Travel – Aug 24 to Dec 25 (delivered in 4 phases) 
3.2  The Programme and its sub projects have been developed to ensure that at a North
Lanarkshire level, North Lanarkshire’s residents and businesses will directly benefit
through: 
• creation of 2,000 new workplace jobs, representing a 1.6% uplift in the future jobs
growth forecast for North Lanarkshire;
• a significant share of some 15,000 temporary construction jobs anticipated to be
generated by the development of the Infrastructure Investment Fund projects –
construction being a predominant local employment sector; 
• estimated 9.2% of North Lanarkshire working age residents having heightened
access to employment opportunities within the wider GCR area;
• additional tender opportunities as a result of GCR City Deal investment for North
Lanarkshire Business and SME’s;
• community benefits derived from all GCR City Deal contracts awarded over £50,000;
and
• a proportionate share of the £2.2bn per annum Gross Value Added (GVA) increase
in the GCR area over the lifetime of City Deal, equivalent to 4% uplift in the region. 
3.3  Each project at Outline Business Case stage and at sub-project at Full Business Case
stage has to demonstrate how it will contribute the high level benefits/impacts above. 
As part of the business case process, through the Economic Impact Assessment,
outputs and wider benefits are identified and are set out in a Benefits Realisation
Profile.  The Business Cases identify the economic impacts and the Benefits Profile
quantify and details when outputs will be delivered and achieved as a result of the
specific project investment.  This approach is in accordance with the GCR City Deal
Assurance Framework.  The benefits will be measured over a 10 year period, reporting
as part of the GCR Gateways until 2035.   
3.4  All North Lanarkshire City Deal contracts seek to maximise community benefits from
contracts awarded for the Project. Community Benefits will be secured for both sub-
projects comprising the Project, through the procurement of services and works in line
with the City Deal Community Benefit Strategy. The Community Benefits will be
delivered through the design, planning and implementation phases, through contracts
Page 10 of 312

Page 11

directly awarded by North Lanarkshire Council and where relevant its partners. The
community benefits menu within the City Deal Community Benefits Strategy will be
used to target benefits that support the Council’s key aims and objectives and deliver
against priorities.   
3.5 The type and number of community benefits to be delivered at a project and contract
level will be determined with reference to the nature and duration of each contract and
supplier. Community benefit outcomes for the Project will be linked to the Council’s
Single Outcome Agreement and Corporate Outcomes and the relevant local outcomes
which underpin these at a Service level. Community Benefits can be reported as part
of the sub projects updates. 
4. Supporting documentation  
4.1  No supporting document presented. 
Pamela Humphries 
Chief Officer (Place) 
Page 11 of 312

Page 12

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The City Deal Cabinet has agreed that Inclusive Growth is to be fully embedded
within the GCR City Deal programme delivery and that it is also committed to
supporting the delivery of the Fairer Scotland Action Plan.  Future NLC subproject
OBC/FBC development will be scrutinised to ensure it meets the duties of the
Fairer Scotland Action Plan. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The North Lanarkshire Council City Deal Programme approved funding allocation
across the 3 headline projects is as: 
• A8/M8 Corridor Access Improvements £6,478,521 
• Glenboig Link Road (complete)  £6,223,205
• Pan-Lan Orbital Transport Corridor  £215,696,493 
The City Deal funding comprises funding from the GCR City Deal Infrastructure
Fund (£148,956,293) and North Lanarkshire Council (£79,441,926). The financial
implications of the City Deal Programme are incorporated within the Council’s
Long-term Financial Plan and to date budgetary implications have been approved
by the Policy and Strategy Committee. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic?
Page 12 of 312

Page 13

Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The City Deal Team work closely with Legal Services on all sub projects focusing
on land acquisition and CPO, procurement and contract preparation and
management, funding agreements and any other related matters. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
All infrastructure projects developed by the council as part of the GCR City Deal will
be subject to relevant environmental and sustainability appraisal and as part of the
design process and subsequent planning application approvals and procurement.   
Furthermore, to adhere with HM Treasury Greenbook best practice, each iteration of
project business case seeking GCR City Deal funding will include a review of the
sustainability considerations, this will include carbon management, involving
categorisation, assessment and mitigation. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The City Deal programme and the delivery of the projects will continue to be
promoted through Corporate Communications and the Glasgow City Region’s
Communications team.   
Page 13 of 312

Page 14

Specific to Muir Street Improvements, a joint communications group with Scotrail,
Transport Scotland and North Lanarkshire Council has been set up to coordinate
communication and promote the Motherwell Station redevelopment and the City
Deal Muir Street improvements.   
In terms of East Airdrie Link Road, a joint communication plan will be developed
with NHS Lanarkshire and North Lanarkshire Council to coordinate communication,
stakeholder engagement and promote the projects as they develop.   
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
A key risk for the City Deal Programme is the current global economic climate and
its short and long term impacts on the delivery of the city deal projects.  This risk is
becoming a live issue for the Programme and will be assessed and recorded within
the City Deal Issues Register. This is not unique to City Deal and the approach to
this risk and issue management will be carried out in conjunction with Finance and
the Glasgow City Region Project Management Office.   
Risk management of North Lanarkshire’s City Deal activity is incorporated within
the council’s City Deal programme risk register which is reviewed by the City Deal
Manager and reported to the council’s City Deal Board.  The City Deal risks are
also integrated in the Planning and Regeneration Service Risk Register.  Each City
Deal sub project has a detail risk register and is managed by the Project Manager. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 14 of 312

Page 15

North Lanarkshire Council
Report
Enterprise and Fair Work Committee
Does this report require to be approved? ☒ Yes   ☐ No
Ref    TAP/CM Date 17/11/23
Town Action Plans Update  
From Pamela Humphries, Chief Officer (Place)
E-mail Greerd@northlan.gov.uk Telephone
David Greer, Growth
Programme Manager,
07583 059816
Executive Summary
The purpose of this report is to update committee on the progress which has been made
on the development of North Lanarkshire’s Town Visions through the publication of Town
Action Plans (TAPs) for Airdrie, Motherwell and Wishaw which were subject to public
consultation in May and June 2023.
The Town Visions were approved by Policy and Strategy committee in September 2021
and since then extensive engagement work has been undertaken to try to ensure that the
concepts and ideas being proposed within the visions truly reflect future community needs.
This report outlines the engagement work undertaken, a summary of findings for each town
and proposals for how the Town Action Plans for Airdrie, Motherwell and Wishaw will be
developed and delivered over the next 10-15 years. 
The Action Plans outline the bespoke proposals which sit behind each of the Town Visions
and identifies key town centre actions which the council will aim to take forward in the short,
medium and long-term.
Town Action Plans are also currently being developed for Bellshill, Kilsyth and Shotts.
Work has also started in relation to gathering local people’s views on Coatbridge Town
Centre as part of this Town Action Plan development process. However, the timescale for
the finalisation of the Coatbridge Town Action Plan is likely to be adjusted to reflect the
requirements of the £20m Town Fund recently announced by the UK Government.
Rather than a Town Action Plan, a finalised Masterplan will be developed for Cumbernauld
Town Centre in recognition of the scale of regeneration activity required following the
proposed demolition of The Centre Cumbernauld.
Lastly, this report provides an update on the £20M Town Fund which has been allocated
by the UK Government to deliver regeneration activity within Coatbridge over a 10-year
period from 2024/25.
Item 3
Page 15 of 312

Page 16

1. Background
1.1 In August 2019, the Enterprise and Growth Committee approved the Economic
Regeneration Delivery Plan (ERDP) 2019-23 as the high-level framework which aimed
to co-ordinate the physical and economic regeneration of North Lanarkshire, increase
economic output, and help address social and economic inequality.
1.2 As a key action arising from the development of the 2019-23 ERDP, in September
2021, the Policy & Strategy Committee approved the Town Visions for all eight town
centres within North Lanarkshire (Kilsyth, Cumbernauld, Airdrie, Coatbridge, Bellshill,
Motherwell, Wishaw and Shotts)
1.3 The development of the Town Visions was not an end in itself, they are conceptual in
nature and were intended to stimulate debate and set a direction of travel towards an
ambitious and sustainable future for our towns.
1.4 The Town Action Plans which stem from the visions were developed in consultation
with the local community. As part of this, site specific investment and development
proposals were identified and discussed in partnership with the Community Boards and
the general public to ensure that the community were directly involved in the
development of the Town Action Plans.
Recommendations
It is recommended that the Enterprise and Fair Work Committee:
1. Endorse the content of this report and the findings of the engagement work
undertaken on the development of the Town Action Plans for Airdrie, Motherwell
and Wishaw;
2. Approve the proposals outlined in the Town Action Plans in order to provide a
strategy for future investment within North Lanarkshire’s Towns;
3. Approve proposals to establish further Town Action Plans (in conjunction with key
stakeholders and local communities) for, Bellshill, Kilsyth and Shotts with overall
completion by April 2024;
4. Approve the approach to the development of the Town Action Plan for Coatbridge
which will be developed in accordance with the requirements related to the Town
Fund allocation for Coatbridge; and
5. Acknowledge that, rather than a Town Action Plan, a finalised Masterplan will be
developed for Cumbernauld Town Centre in recognition of the scale of
regeneration activity required following the proposed demolition of The Centre
Cumbernauld.
The Plan for North Lanarkshire
Priority Improve economic opportunities and outcomes
Ambition statement
(2) Refocus our town centres and communities to be multi-
functional connected places which maximise social, economic,
and environmental opportunities
Programme of Work Transforming Places
Page 16 of 312

Page 17

2. Report 
2.1 Consultation and Engagement  
2.1.1 The consultation on the Draft Town Action Plans for Airdrie, Motherwell and Wishaw
has involved a wide programme of engagement which ran between the 22nd of May
and the 30th of June 2023 and included: 
• press releases and information provided on council web and social media platforms; 
• flyers and posters dropped off in local town centre shops and businesses to raise
awareness of the plans within the local business community and promote planned
workshops, drop-in-sessions and exhibition; 
• on-line consultation via Community Boards and at Tenants & Residents Association
events. 
• the production of a physical exhibition for each of the three towns, located in the
library within each town, plus an online exhibition (accessible via the council’s
website) providing local residents with the opportunity to explore, review, comment
and add to the Town Action Plan proposals via an online survey; and 
• eighteen drop-in sessions which were held in the local libraries throughout the six
weeks of the consultation period to allow people to come in and discuss the
proposals/identify priorities for their town centre. 
2.1.2 The table below summarises the level of engagement achieved during the six-week
publicity and consultation period: 
Publicity & Consultation Event Summary
Table 
Total  Airdrie  Motherwell  Wishaw 
Number of Views to the TAP News Article  514       
Number of On-line Views of the TAP
Documents 
1,327  395  446  486 
Number of Views to Have Your Say page  289       
Number of Views to Consultation events
page 
110       
Responses to Survey Monkey
Questionnaire 
32  13  9  16 
Emails/Postcards/Letters  16 5  6 5 
Visitors to Drop-In Sessions  76  22  23  31 
2.1.3 The outcome of the consultation programme can be summarised as follows: 
• The response from the Community Boards was positive with some issues raised as
to the reliance upon buy-in and support from the private sector with the overriding
concern being the timescale for the delivery of the Town Hub investment and how
this could either add value to the town centre or damage the footfall over time. Every
Community Board recognised that retail trends are such that there needs to be an
alternative to the traditional function of our high streets, moving towards a more
mixed-use service and leisure-based economy. The Community Boards were
particularly supportive of the council’s promotion of new ‘Town Centre Living’
Page 17 of 312

Page 18

developments as pilot projects to persuade the private sector to invest in town
centres. 
• The public consultation generated over 1,300 views of the online TAP documents
in addition to the 76 people who engaged in discussion with officers at the drop-in
sessions at the physical exhibitions in the local libraries. The council received 32
written responses to the public consultation through the online survey – 13 Airdrie,
9 Motherwell and 10 Wishaw. The majority of responses supported the production
of the Town Action Plans and their content as it was recognised that our towns are
going through structural change and that within the council area we need both
mitigation and alternative forms of development to replace the more traditional uses
of the high street. The importance of heritage buildings to the sense of civic pride
was also a key priority for the public. 
• There was little or no response from the business community or retailers which is
disappointing as they hold the key to the delivery of the transformation that we are
seeking to promote. This is something that needs to be addressed in phase 2 of the
TAP programme. 
2.1.4 Full details of the engagement and consultation findings are outlined in Appendix 1:
The Report on the Consultation for the Draft Town Action Plan. The final versions of
the Town Action Plans for Airdrie, Motherwell and Wishaw are contained in Appendix
2. 
2.2     Delivering the Town Action Plans 
2.2.1 Further to committee approval of the finalised Town Action Plans, the delivery of the
proposals for each town will be taken forward as follows: 
• the rollout of the council’s New Supply Programme and implementation of
Registered Social Landlord planned developments to deliver new town centre living
opportunities across all three towns over the next five years;
• the delivery of short, medium and long-term regeneration proposals as outlined in
the Town Action Plans;
• continued engagement with local communities, private sector owners of the land,
buildings and businesses and potential investors to identify partnership projects and
ways to support the private sector in contributing to the delivery of the vision; 
• development of proposals to secure funding from the council’s next 5-year capital
programme from 2024/25;
• engagement with the UK and Scottish Governments and other grant giving bodies
to identify external funding to support the delivery of the Action Plans; and
• the production of a performance framework for each town that will be used to
measure and review progress and update plans. 
2.2.2 The Town Action Plans will be updated on an annual basis and be flexible enough to
reflect changes in council priorities, the availability of internal and external funding and
to deal with unknowns such as the impact from the pandemic, post-Brexit trade issues
and the cost-of-living crisis. 
2.3    Future Town Action Plan Development 
2.3.1 Town Action Plans are currently in development for Bellshill, Kilsyth and Shotts with
overall completion by April 2024.  Work has also started in relation to gathering local
people’s views on Coatbridge Town Centre as part of the Town Action Plan
Page 18 of 312

Page 19

development process. However, the timescale for the finalisation of the Coatbridge
Town Action Plan is likely to be adjusted to reflect the requirements of the £20m Town
Fund recently announced by the UK Government, as set out in 2.4 below.
2.3.2  It should also be noted that rather than a Town Action Plan, a finalised Masterplan will
be developed for Cumbernauld Town Centre in recognition of the scale of regeneration
activity required following the proposed demolition of The Centre Cumbernauld. 
2.4    UK Government Town Fund 
2.4.1   On 30th September, the UK Government announced that 55 towns will benefit from £1.1
billion levelling up investment as part of a long-term plan for towns across the UK. 
2.4.2 As part of this investment, 7 towns in Scotland were awarded £20M each to deliver
activity over a ten-year period (£2M funding per year) including Coatbridge. 
2.4.3 Although the council await further guidance on this fund, early information provided
highlights that: 
• funding will be made available from summer 2024;
• this funding will be available to spend across three streams: safety and security;
high streets, heritage and regeneration activity; and transport and connectivity; and
• long-term town plans must be developed and approved by a Town Board
(consisting of local community and business representatives, public sector
organisations, key cultural, arts, heritage and sporting organisations and local MP)
and submitted to UK Government for approval. 
2.4.4 As this fund will be a key driver in what will essentially be the Town Action Plan for
Coatbridge, this will impact upon how this specific plan is drawn up and delivered. 
3. Measures of success 
3.1 The successful delivery of the regeneration proposals as outlined in the Town Action
Plans. 
3.2 The development of effective Town Action Plans for Bellshill, Coatbridge, Kilsyth and
Shotts and masterplan for Cumbernauld Town Centre. 
3.3 The successful drawdown and spend of the Town Fund allocated to Coatbridge. 
4. Supporting documentation 
4.1 Appendix 1 The Report on the Publicity & Consultation
4.2 Appendix 2 Airdrie, Motherwell & Wishaw Town Action Plans 
Pamela Humphries
Chief Officer (Place) 
Page 19 of 312

Page 20

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☒ 
If Yes, please provide a brief summary of the impact?
The delivery of regeneration proposals will incur costs. As such, bids for these
works will be sourced through the council’s capital programme and where possible
external funding.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
TAP projects will require input from Legal & Democratic Services (including for
example conveyancing support, preparation of legal documents etc.). Projects and
required inputs are discussed regularly with Legal & Democratic Services through
ERDP Steering Group and project meetings.
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 20 of 312

Page 21

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Community input to the ongoing development and amendment of TAPs will be
promoted through council communications activity.
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 21 of 312

Page 22

Appendix 1 
Report on the Town Action Plan Publicity & Consultation
for Airdrie, Motherwell and Wishaw 
Introduction 
The following report sets out the publicity and engagement process to ensure community input
to the development of Town Action Plans for Airdrie, Motherwell and Wishaw. 
Background 
The Town Action Plans, which stem from the Town Visions, were developed in consultation
with the community through the relationships we have built with the Community Boards and
their sub-groups. Site specific investment and development proposals were identified and
discussed in partnership with the Community Boards to ensure that the community are directly
involved in the development of the draft Town Action Plans. 
The consultation on the Town Action Plans for Airdrie, Motherwell and Wishaw has also
involved a wide programme of community engagement which ran between the 22nd of May
and the 30th of June 2023 and included: 
• press releases and information provided on council web and social media platforms; 
• flyers and posters dropped off in local town centre shops and businesses to raise
awareness of the plans within the local business community and promote planned
workshops, drop-in-sessions and exhibition. 
• on-line consultation via, Community Boards and at Tenants & Residents Association
events; 
• the production of a physical exhibition for each of the three towns, located in the central
library plus an online exhibition (accessible via the council’s website) providing local
residents with the opportunity to explore, review, comment and contribute to the
proposals via an online survey; and 
• eighteen drop-in sessions which were held in the local libraries throughout the six
weeks of the consultation period to allow people to come in and discuss the Town
Action Plans directly with officers. 
The table below summarises the level of engagement achieved during the six-week publicity
and consultation period: 
Publicity & Consultation Event Summary
Table 
Total  Airdrie  Motherwell  Wishaw 
Number of Views to the TAP News Article  514       
Number of On-line Views of the TAP
Documents 
1,327  395  446  486 
Number of Views to Have Your Say page  289       
Number of Views to Consultation events
page 
110       
Responses to Survey Monkey
Questionnaire 
32  13  9  16 
Emails/Postcards/Letters  16 5  6 5 
Visitors to Drop-In Sessions  76  22  23  31 
Page 22 of 312

Page 23

The outcome of the consultation programme can be summarised as follows: 
• The response from the Community Boards was positive with some issues raised as to
the reliance upon buy-in and support from the private sector with the overriding concern
being the timescale for the delivery of the Town Hub investment and how this could
either add value to the town centre or damage the footfall over time. Every Community
Board recognised that retail trends are such that there needs to be an alternative to the
traditional function of our high streets, moving towards a more mixed-use service and
leisure-based economy. The Community Boards were particularly supportive of the
Council’s promotion of new ‘Town Centre Living’ developments as pilot projects to
persuade the private sector to invest in town centres. 
• The public consultation generated over 1,300 views of the online TAP documents in
addition to the 76 people who engaged in discussion with officers at the drop-in
sessions at the physical exhibitions in the local libraries. The council received 32 written
responses to the public consultation through the online survey – 13 Airdrie, 9
Motherwell and 10 Wishaw. The majority of responses supported the production of the
Town Action Plans and their content as it was recognised that our towns are going
through structural change and that as a council we need both mitigation and alternative
forms of development to replace the more traditional uses of the high street. The
importance of heritage buildings to the sense of civic pride was also a key priority for
the public. 
• There was little or no response from the business community or retailers or which is
disappointing as they hold the key to the delivery of the transformation that we are
seeking to promote. This is something that needs to be addressed in phase II of the
TAP programme. 
The following tables set out the comments received from the public: 
Town Action Plan Phase 1: Postcard/Letter/Email Responses (Verbatim) 
Public Comments
Airdrie 
We need homes for people like myself over sixty to buy in the town centre.
You can’t even buy a pair of trousers or shoes in Airdrie anymore, decent shops needed
too. 
No bus link to Glasgow! 
Need more men’s/women’s clothes and shoe shops. 
I am not at all impressed by your “Vision” for Airdrie because I know that at the foot of all
buildings the pavements will be just the same as they are now – covered in mud and puddles
when it is wet and dirt, grit and weeds when it is not. No one seems to know how to use a
brush any longer. You high flying executives need to get out of your helicopters and on to
your feet. 
I am concerned that the taxis that come round Buchanan Street and Boots corner may
disappear (due to no access) and that those with mobility issues may find it difficult to access
the town centre if the walk from and to the taxi rank in order to go to the shops or bank, is
any distance. 
I would also like to highlight the possibility that there may be a risk of pedestrians and
cyclists/scooters using the same space and I feel that could cause problems for mothers with
young children and the elderly. 
There may also be a lack of seating or benches around the town centre for the elderly or
people with mobility issues. 
Page 23 of 312

Page 24

Motherwell 
Public Transport is very important, more child friendly places to sit in warm for free. Safe and
secure town centre (no begging). Water feature, farmer markets. Lots of shops (drop rents),
free car parking.
The paths and grounds in the town centre are all stained and filthy. I think a start would be to
wash them regularly. 
Just looks like a housing estate with some shops! This is not a town centre in my opinion.
Action Plan Map, inaccurate labelling PO is no longer in that location, underpass/subway
why two terms? Underpass at Menteith Road not shown, Govt Offices is a car park?  
Action Plan/Vision Map, very little direct link between the plan and vision. 
The overall plan looks good. Replacing unwanted shops with housing is the only way to go.
The problem is, the new housing will require all vehicles to use Menteith Road which will
make it very congested. Better to have a new road to the right of High Road to take vehicles
round the back of the station. 
The Old Town Hall, YMCA and Masonic Halls are being made into housing is a good idea as
it keeps the history of Motherwell. Heritage assets are very important to any area. Motherwell
has already had many historic buildings removed, removing anymore will make Motherwell
more unrecognisable 
The bridge between the car park and the shopping centre is a brilliant idea as well as
changing the Aquatec to housing 
The new Transport Interchange Hub will help bring more people to the area. The Town Hub
being located at Ravenscraig is a good idea as that area needs help. Also the new road
through Ravenscraig to Airbles Road will benefit Motherwell and beyond 
Is it not better to build homes above the shopping centre as it is rather than demolition? 
I don’t agree with turning the area between Wilko and KFC into housing. I know you want to
build 5,000 homes by 2035, but is removing the shopping centre and replacing it with
housing a good idea? 
The new square within the shopping centre is a good idea, but is creating that as well as
encouraging new housing to the area a good idea? The shops will either have to close
completely or move elsewhere, this means people will have to go to other places and this will
cause the shopping centre to go into a decline. 
The Vision of Motherwell right now makes the area unrecognisable. Many years ago the
town centre was cut in half, if this vision happens then the town centre will be cut into a
quarter. 
The mixed town hub being proposed to be built within the town centre is a good idea as it will
bring people to the area for different reasons. 
Is the Town Vision being proposed already agreed? You say you are in talks with the owners
of the town centre now to create the new square and housing, has it been agreed fully
already or partially? Is this ‘Have Your say’ just box ticking? 
Wishaw 
Hopefully the Public Library will still stay where it is. 
I hope the housing projects have a bit of style and character and we don’t end up with the
visual prison – like boxes. Modern housing projects always prioritise the functional over
aesthetics. Hoping planners have a bit more vision than that and we are not left with a whole
load of short-lived carbuncles. 
The proposed plans seem to be a positive step. It would be helpful to address the anti-social
behaviour of pre-teens and teens so we can all live in peace. 
I have major concerns about the state of some (many) of the buildings along the streets of
the town centre. Someone is going to be injured by the decaying sandstone and roofing
falling onto pavements. Can you do anything to remove the danger? 
I am sending this to share my contact details with you as I wish to become more active in
supporting local development. My interests are in community development and as a project
Page 24 of 312

Page 25

consultant, I am keen to identify and engage in projects in and around Wishaw and
Lanarkshire. 
‘Have Your Say’ Online Survey Questionnaire (Verbatim free text Responses) 
Airdrie
Not enough variety in the shops.
More food shopping
Better choice of shops as there is nowhere really to buy clothes, books, toys, music
More choices in all retailers  
Get all the empty buildings turned into much needed housing and stop allowing all the cars
to drive through l would also like the shops put into the one section rather than
mismatched all over the place.
It will be good to have Airdrie back, but change has to happen, more new and Modern
buildings, houses, flats and would be nice to have some restaurant’s to eat out .
Green space so it is a pleasant place to walk about. At the moment if feels built for cars
and is grey and bleak.
We moved here a few years ago and essentially view the town centre as a drag to go into.
I support anything that would make the space greener and feel more like a community than
a dying open mall.
Make it prettier, cleaner, more green as in trees, plants, flower areas. More uniformity
across the buildings on Graham Street.
Just make it generally nicer 
Have Decent shops. Not houses. NLC need to Encourage people into the town with
attractive retail
Instead of high rents. Encourage low rent to encourage a variety and increased number of
retailers. This in turn would encourage people to visit the town and spend money. I rarely
come into Airdrie despite living local. There is nothing in it other than dozens of fast food
and charity shops. Nowhere to buy clothes or anything other than ‘pound’ shops for
household items
Protected cycle-only lanes between town centre, station and NCN75
Several errors in document text and some maps hard to see. No real vision for making
town centre enjoyable to walk around let alone cycle. Need networks of active travel routes
not just one or two. For example, quality link from lane next to Airdrie CHC with zigzag
ramp rebuilt as long slope along Callon St - widened paths and narrowed roundabout with
improved crossings to train station. Need more pedestrian/cycle bridges over railway - if
Motherwell can have more why not Airdrie?
Make it easier for people to walk, cycle and wheel into the town centre.
We live walking distance from the town centre but feel motor traffic has priority in terms of
timings for pedestrian crossings and a general feel that motorists and cars dominate the
area.
Have more shops that offer a variety of things to buy so you don’t need to leave for other
towns that have the shops you’re looking for
Motherwell
Make it a town centre again. Give businesses grants to open stores and cafes.
Improved retail & access. More restaurants
I think major investment in upgrading buildings, cafe, bars, restaurants are needed while
repurposing historic buildings and buildings of character
The shops are all much of the same. Having a wide variety of shops would bring different
people to the area. This would result in the shops having a wide range of customers and
using public transport more.
Page 25 of 312

Page 26

The Town Vision for Motherwell is very drastic and according to the plan you are already in
talks with the owners of the Town Centre to develop a new square and remove the shops
and buildings already there. It gives the impression the vision has been approved and this
'Have Your Say' questionnaire is a box ticking exercise.
Get rid of the high-rise tower and develop flats above the shops to bring people and
activity into the town centre.
Need to work with owners and businesses in the town centre to deliver the change set out
in the Vision. Motherwell deserves better.
Having a more variety of shops, restaurants, and bars. Motherwell needs a niche which will
make more people come to the area. By removing the Shopping Centre as it is and
'encouraging' more housing will cut the Centre in half and people will go elsewhere.
Motherwell has already lost so much of its heritage buildings and doesn't need to lose any
more.
This is a major change for Motherwell. So why isn't this being advertised in the Motherwell
Times? I believe the Town Vision has already been approved and this is just a box ticking
exercise for you to say the public had their say.
To have more variety of shops. This would bring more people to the area and will result in
people using the cafes and restaurants giving them a healthy profit.
More shops, cafes, bars, restaurants and entertainment events would be better for
Motherwell and bring people from all over to the area. The new Transport Interchange and
the new bus stop and taxi rank at Muir Street will bring more people to the area. Changing
the town centre to housing will mean less shops thus resulting in people going elsewhere.
This will cause Motherwell Town Centre to go into a decline and the area will become
rundown and will attract no visitors.
Just more shops & cafes. So many empty units makes it quite a depressing place to be.
Please protect the lovely old buildings that are left.  Like you're doing with the YMCA
building. I can't stand to see every trace of heritage wiped away. Please don't close any
more banks. Please keep free parking.
Build a network of protected cycle routes (not just painted lanes like picture)
Text in document for active travel seems to be for Wishaw not Motherwell? New bridge
could be useful link but no real vision for walking or cycling routes. If Aquatec goes, it's an
opportunity to upgrade Greenlink path and join it to improved crossing of Merry St at
Roman Rd. Only needs a short protected section and zebra crossing across Dalziel St to
car park. Dalziel House car park is now underused. Pull parking spaces in and create
segregated cycle route (with bollards/whatever) along north-west edge of car park to link to
underpass and path to Scott St. Other way from Dalziel St build cycle path on grass verge
east along Merry St, Wilson St, Allan St to Coursington Rd then into Ravenscraig. Would
be important active travel link plugging gap west of New Craig Rd. The new paths from
Sports Centre to Craigneuk and into Wishaw Main St show how it can be done. Complete
traffic-free route between Motherwell and Wishaw town centres would be a game changer.
If there was a more direct cycle route with on-road protected lanes it would be faster than
driving through traffic. Rail underpass should link to Windmillhill St at Lochend St too.
Make it single toucan crossing to a new build-out at Boots pharmacy (create parking lane if
you want). Build-out should go to corner into lane to McDonald St. Could then link south to
Airbles Rd and north to Asda. Also should have cycle routes along Airbles Rd to
Strathclyde Park - could have big benefits for health and quality of life. 
Wishaw
Upgrade Belhaven Park to a multigenerational park and build a community facility there
too but no more pump tracks it has to be multigenerational
Stop people hanging about outside shops, back courts drinking. It can be intimidating,
Have fewer empty shops
More living facilities within the town centre will lead to an increase in anti-social behaviour
More variety of shops within a smaller area. Wishaw needs an attraction which would be
unique and bring more people to the area.
Page 26 of 312

Page 27

Wishaw does need help and the current Town Vision being 'offered' will help the town.
No traffic lights at the Cross
Preserve the old buildings, whilst making good use of them. Fill empty units.
Wishaw's in a sorry state. Anything that can be done to improve the look of it, would be
very welcome. Please keep the free parking. The carpark near the bingo hall needs some
TLC though.
The cleanliness of the streets and the dog poo, try navigating with a pram to keep your
tires clean nearly impossible 
Build a network of protected cycle routes to encourage active travel
Glad to see route for Alexander St/Hill St/Kenilworth Ave - hope it's high quality. Must deal
with roundabout - no need for it to be as big. Looks like enough space to create Dutch-
style roundabout (see new East Ren one on A77). Lane downside of Houldsworth and
bingo needs ramp created to make it accessible. Across Kirk Rd end of Shand St should
replace railings with bollards and drop kerbs to open it up to active travel. Need quality link
between Wishawhill Main St path and Uni Hospital Wishaw. Lots of green space around
Wishaw, especially Greenhead Moss, but no decent active travel links between them.
Needs more retail shops. Lot of empty units. 
Page 27 of 312

Page 28

‘Have Your Say’ Online Questionnaire 
1. Which draft Town Action Plan are you commenting on? 
2. How often do you visit this town centre? 
41%
29%
29%
0% 5% 10% 15% 20% 25% 30% 35% 40% 45%
Airdrie
Motherwell
Wishaw
44%
29%
6%
9%
9%
0%
0% 10% 20% 30% 40% 50%
Daily
Weekly
Fortnightly
Monthly
A few times per year
Yearly
Page 28 of 312

Page 29

3. How do you usually travel to the town centre? 
4. Why do you visit the town centre? Please select all that apply. 
9%
12%
59%
3%
18%
0% 10% 20% 30% 40% 50% 60% 70%
Bicycle
Bus
Drive (private car)
Train
Walk
9%
4%
12%
8%
15%
3%
15%
12%
17%
0% 2% 4% 6% 8% 10% 12% 14% 16% 18%
Local services (GP, dentist, Council offices)
Leisure facilities (gym, swimming etc)
Library
Access to public transport (train station or bus stop)
Cafes, bars and restaurants
Entertainment
Access to banks, Post Office and other services
Shopping for other goods (e.g. clothes)
Shopping for food
Page 29 of 312

Page 30

5. To what extent do you agree with the following statement:
The town centre meets my needs… 
6. Please provide any comments as to why you agree or disagree with the previous
statement: 
15%
47%
15%
15%
9%
0% 10% 20% 30% 40% 50%
Strongly disagree
Disagree
Neither agree nor disagree
Agree
Strongly agree
Not enough variety of shops Too many charity shops –
need more food and clothes
shops
Empty buildings
need addressing
I want to see more
green spaces and
outdoor meeting areas
We need more focus on local
independent retailers. I’d
also like to see more dog
friendly cafes/bars.
The new transport
hub is a real asset
to Motherwell. It
makes travelling to
shops easier.
Wishaw shops are spaced
out over a large area with
gap sites in between – this
needs to be given attention.
Town centres
need better
cycle routes
Airdrie town centre needs
attention around the main
shopping areas, Stirling
Street and Graham Street
Page 30 of 312

Page 31

7. What does the town centre need to make you use it more often or to maintain your
interest? 
8. Do you support the actions/developments set out in the draft Town Action Plan which
seeks to move to a more mixed use? 
9. What are your priorities for change within the town centre?
Priority 1: Redevelop or upgrade empty retail units
Priority 2: Develop outdoor spaces for people to meet/event space (Civic Space)
Priority 3: Develop active travel routes to town centres
Priority 4: Develop new homes within the town centre
Priority 5: Make homes and businesses more energy efficient
8%
36%
6%
9%
17%
24%
0% 5% 10% 15% 20% 25% 30% 35% 40%
Other
Improved retail offering
More town centre housing
More local services (dentist, GP, Post Office)
Improved leisure offering (e.g. gym,
swimming pool)
More cafes, bars and restaurants
29%
21%
50%
0% 10% 20% 30% 40% 50% 60%
Unsure
No
Yes
Page 31 of 312

Page 32

10. Do you support the Council’s ambition to promote town centre living to address future
vacancy within town centres? 
11. Do you support the safeguarding of heritage buildings within the town centre? Heritage
buildings can include listed buildings or places of local historical interest. 
12. What is your favourite building/place within the town centre?  
21%
24%
56%
0% 10% 20% 30% 40% 50% 60%
Unsure
No
Yes
9%
3%
88%
0% 20% 40% 60% 80% 100%
Unsure
No
Yes
Page 32 of 312

Page 33

13. If you could change one thing about the town centre, what would it be and why? 
14. Do you have any other comments related to the Town Action Plans? 
Better variety of shops
Turn empty buildings
into much needed
housing
Put shops into one
section of the town
rather than a
mismatch all over 
the place
Green space so it is a
pleasant place to walk
about. At the moment it
feels built for cars and is
grey and bleak.
Make it easier
for people and
walk, wheel and
cycle to the
town centre
Demolish high rise
tower blocks and create
new flats above shops.
Build a network
of protected
cycle networks
Preserve the old
buildings and make
good use of them.
It will be good to have
Airdrie back – change
needs to happen.
I support anything that
will make the town
centre greener and feel
more like a community 
Lower rents to
encourage a variety and
increased number of
retailers into the town  
Theres no real vision for
making Airdrie town
centre enjoyable to walk
around let alone cycle
Need to work with
owners and
businesses in the
town centre to deliver
the change set out in
the Vision.
Motherwell deserves
better.
Please protect the
lovely old buildings
that are left like
you’re doing with
the former YMCA
building A complete traffic-free
route between
Motherwell and Wishaw
town centres would be a
game changer 
Page 33 of 312

Page 34

15. Which area are you a resident of? Please select your nearest town 
16. Which of the following best describes you? 
9%
18%
29%
3%
6%
35%
0% 5% 10% 15% 20% 25% 30% 35% 40%
Outwith North Lanarkshire
Wishaw
Motherwell
Coatbridge
Bellshill
Airdrie
0%
9%
9%
0%
12%
71%
0% 10% 20% 30% 40% 50% 60% 70% 80%
I attend school or college within this town
I have family/friends who live in this town
I often visit this town
I own a business which is based in this town
I work in this town
I live in this town
Page 34 of 312

Page 35

Appendix 2 
The following documents constitute Appendix 2 
• Town Action Plan for Airdrie 
• Town Action Plan for Motherwell 
• Town Action Plan for Wishaw 
Page 35 of 312

Page 36

Town Action Plan
Airdrie
Page 36 of 312

Page 37

Written, designed and produced by Corporate Communications, North Lanarkshire Council.
Design concepts provided by:
Ironside Farrar Ltd, Environmental Consultants - Town Vision design concepts
Norr, Architecture, Engineering, Planning and Design - Town and community hub design concepts
Mast Architects - Town living Design Concepts
All statistics and information correct at date of print: November 2023.
Page 37 of 312

Page 38

Contents
Introduction  .............................................................................. 5
SECTION 1: The Scale of the Challenge and Key Trends  .......... 7
SECTION 2: Key Considerations for Airdrie  ............................... 13
A High Street for Everyone ......................................................... 14
A Vision for our Towns  .............................................................. 15
The Vision for Airdrie  ................................................................. 17
Town and Community Hubs  ..................................................... 19
Economic Prosperity & Stability  ................................................ 21
Town Centre Living  ................................................................... 23
Movement & Active Travel  ......................................................... 26
Built Heritage & Place  ............................................................... 28
Transition to Net Zero  ............................................................... 31
Other Considerations  ................................................................ 32
SECTION 3: Airdrie Town Action Plan  ....................................... 33
Town Action Plan Proposals  ..................................................... 34
The Town Action Plan Proposals Map  ....................................... 35
3D Proposals Map  .................................................................... 36
Strategic Alignment  .................................................................. 37
Page 38 of 312

Page 39

Page 39 of 312

Page 40

Introduction
This is North Lanarkshire. This is
the place to Live, Learn, Work,
Invest and Visit. This is our vision.
We have come a long way with one of the fastest growing economies in
Scotland, the most ambitious council housebuilding programme in the
country, record levels of infrastructure investment and dozens of new
schools. These are just a few examples.
The Plan for North Lanarkshire, approved in 2019, offered a clear way
forward. It offered a shared ambition for inclusive growth and prosperity
for all and we are delivering on that ambition.
We’re making huge progress, with investment and development
happening in all our towns and communities.
But what comes next? How do we deal with the undoubted challenges
that remain, like unacceptably high levels of deprivation and child poverty,
in-work poverty and areas of inequality across communities? How do we
become the agents of change for towns and communities to ensure they
have a sustainable future in the face of declining revenue budgets?
This vision for North Lanarkshire, as the place to Live, Learn, Work, Invest
and Visit is reflected in the Town Action Plan for Airdrie which seeks to
identify site specific proposals to deliver the concepts set out in the vision.
The Town Action Plan has been divided into three sections as follows:
Section 1: The scale of the challenge facing North Lanarkshire and the
key trends which are impacting on North Lanarkshire’s Town Centres.
Section 2: The key issues and opportunties which have helped formulate
the proposals outlined in the Town Action Plan for Airdrie.
Section 3: The Town Action Plan Proposals.
5
Page 40 of 312

Page 41

Page 41 of 312

Page 42

Section 1:
The Scale of the Challenge
and Key Trends
Page 42 of 312

Page 43

Key Trends
The following highlights the potential impact of economic, demographic,
technological and social trends on our towns.
RETAILING
Demand for UK retail space on our high street is now at its lowest since 2007,
with a move toward online retail as well as prime mixed-use locations (such as
Silverburn and Braehead) offering retail, leisure, entertainment and amenities,
whilst serving vibrant night-time economies. Our town centres are highly
vulnerable to weak footfall with a decline in retail sales across Scotland of 6.2%
since 2021 alone (following year on year drops over the last decade).
The inevitable reality is that fewer physical stores will be present on the high
streets of the future and that the role of those remaining stores will need to
evolve. On its current trajectory, it is estimated that physical retail sales across
our towns will fall by a further 35% over the next five years with a growing
reliance on convenience and discount retailers paying lower rents. We will see
consumers with lower disposable income and limited access to higher end
retail. North Lanarkshire in particular will be highly susceptible to this trend
where our towns are competing with bigger centres such as Glasgow and
Edinburgh for footfall and retail spending.
Both large and small scale operators also continue to struggle to adapt to the
growth in online shopping. UK consumers spend more online than any other
European country – accounting for 18% of all retail sales. It is projected that
35% of sales within the next few years will be online..
Store-based profit margins have more than halved over the last decade as
consecutive rises in business rates, the national living wage, the national
minimum wage and relative occupancy costs spiral upwards.
8
Town Action Plan Airdrie
Page 43 of 312

Page 44

LIVING
North Lanarkshire is home to over 341,000 people living
in more than 154,000 homes. The Council is Scotland’s
largest local authority landlord, owning and managing
more than 36,000 homes with a further 5,000 new
affordable homes by 2035.
Forecasts predict that the number of households will
rise by 1.5% (2,300) between now and 2028. However,
the local development plan promotes sufficient land for
more than 21,000 homes across North Lanarkshire.
Of our 154,000 homes, only circa. 1,500 - or just under
1% - are located within town centres with over half of
these built before 1919 and likely to require significant
future repair and maintenance. There is, however,
significant opportunity for residential development to
replace the contraction in retail. This is a key way of
helping to develop footfall within our town centres and,
in turn, creating a more viable (although reduced) retail
and commercial offer.
POPULATION
North Lanarkshire is currently home to around 6.3% of Scotland’s total
population. However, the number of deaths has exceeded the number
of births over the last three years although it is forecast that North
Lanarkshire’s total population will increase by 0.3% between 2018-
28 due primarily as a result of net inward migration.  In contrast, the
population of Scotland over the same time period is anticipated to grow
by 1.8%, demonstrating that North Lanarkshire is still failing in attracting
people to come and live here.
It is well established that economic growth is closely linked to population
growth. As such, to help make North Lanarkshire a more prosperous
place, it is essential that we provide the right type of housing and
environment that will make this a place where people already living in, or
moving to or within Scotland, want to relocate.
DEMOGRAPHICS
Children and young people aged 0-15 make
up almost one fifth of North Lanarkshire’s
population (18%) and this is forecast to
decrease to almost 16% by 2028.
Almost two thirds (64%) of North Lanarkshire’s
population are of working age  (16-64 year
olds). This is forecast to continue to decline in
the long-term.
The older adult population (aged 65+) accounts
for 18% of North Lanarkshire’s total population.
This is expected to increase so that, by 2028,
one in five (20%) of people living in North
Lanarkshire will be aged 65+.
This demographic change will have an impact.
Tax income is likely to fall because there will
be fewer people of working age, and care
responsibilities will increase. It is essential that
towns are designed to ensure that people are
able to live safely in their own homes for as long
as possible, homes are adaptable and flexible
and local services accessible.
9
Page 44 of 312

Page 45

CONNECTIVITY
We need to put transport and digital infrastructure in
place to ensure residents can access employment
and leisure as well as online opportunities and
services.
13.2% of Scotland’s motorway network is located
in North Lanarkshire, a place which has excellent
rail links to Glasgow and Edinburgh as well as
three of Scotland’s busiest passenger train stations
(Motherwell, Croy and Airdrie).
While transport links in and out of North Lanarkshire
are excellent, there are relatively poor transport
connections within the local authority area. The
development of the Pan Lanarkshire Orbital Transport
Corridor linking the M80, M8 and M74 will in part
address this issue, but the visions need to ensure
that our towns are designed as accessible and well-
connected places.
Road and rail use has grown significantly over recent
years but the number of bus journeys has declined by
approximately 23% which is significantly higher than
the Scottish  average of a 5% decline. Given that only
37% of households earning less than £10,000 can
access a private car compared to 97% of those who
earn more than £40,000, public transport is a key
issue for the people of North Lanarkshire.
Whilst a national conversation about the shape of
future public transport is required, particularly in terms
of cost, ticketing, coverage and responsiveness,
the Council needs to work with partners to identify
local gaps and how they can be filled through, for
example, community transportation and active
travel. This was a key recommendation of the
North Lanarkshire Fairness Commission and will be
subject to discussion as part of the development
of the emerging Local Transport Strategy for North
Lanarkshire.
The ban on the sale of new petrol or diesel cars after
2030, and a requirement for them to be off the road
by 2040, will also require significant investment in
infrastructure to support a shift in how we fuel our
private vehicles e.g. electric vehicle charging points
within car park’s and on streets and the development
of EV Hubs (fast charge sites) along key transport
corridors and within town centres.
DIGITAL ECONOMY
86% of UK households use the internet on a
daily basis and it is anticipated that this use will
continue to grow and drive demand for faster
and better quality access.
It is clear that good quality internet access will
be essential for future business development
and will underpin many areas of employment.
Whilst 98% of homes have access to superfast
broadband, the uptake of this is relatively low
due to the cost of access. The Council has
secured a digital partner, Commsworld, to take
this investment further, expand opportunity for
full-fibre and ultra-fast broadband and develop
more affordable access for all. This will include
delivery of these digital connections as part of
the planned development and regeneration
works across North Lanarkshire’s town centres.
10
Town Action Plan Airdrie
Page 45 of 312

Page 46

THE LOW CARBON AGENDA
A Scottish target of net zero for all greenhouse
gas emissions has been set for 2045. However, in
recognition of the importance of climate change,
the council declared a climate emergency in 2019,
committing it to reduce council carbon emissions
to net zero by 2030.
In particular, new zero carbon policy and
legislation will inform the way we design and build
new housing, or refurbish existing housing stock,
towards zero carbon. This includes:
INFRASTRUCTURE
New development within our town centres could in
part be constrained by existing infrastructure such
as energy, water and sewerage.
There is a need for early engagement with utility
providers to identify issues of capacity within
existing networks to ensure that the infrastructure
to support development within our town centres is
available at the right time and the right cost.
• ensuring all new housing uses renewable or
low carbon heating systems from 2024;
• ensuring all private rented housing achieve an
Energy Performance Certificate (EPC) Rating
of Band C or above by 2030;
• ensuring all socially rented housing achieve an
Energy Performance Certificate (EPC) Rating
of Band B or above by 2032; and
• developing an undertaking, where financially
and technically viable, to ensure all housing is
net zero carbon by 2045.
11
Page 46 of 312

Page 47

12
Town Action Plan Airdrie
Page 47 of 312

Page 48

Section 2:
Key Considerations for Airdrie
Page 48 of 312

Page 49

22 
Wishaw
Rebalancing
RepopulatingRepositioning
Repurposing
Airdrie
A High Street for Everyone
A People Centred Approach
Our high streets offer a rich and authentic environment
that for generations has been the backdrop to the
ceremonies and memorable events of our community.
Furthermore, the health of our town centre reflect
the health of our wider community or society. An
energised town centre that is open to all and where
there is opportunity for improvement, will help
enrich the lives of our residents. It is critical that we
achieve a perception shift in our communities and
stakeholders and reposition the High Street at the
heart of the community. In doing so we are seeking to
develop a better town centre where the requirements
of all, regardless of age, ability or wealth, are
accommodated.
The following section outlines the key issues and
opportunities which have helped drive forward the
development of the Town Action Plan for Airdrie. These
key drivers have been identified from:
• the findings which were outlined in The Town
Centre Visions and Town & Community Hub plans
which were approved by Council in 2021 (as part
of the Council’s ‘The Place: The Vision’ strategy)
following an extensive programme of public
consultation;
• desktop research to assess the key challenges,
issues and opportunities which need to be
addressed or taken forward to help support the
transformational change of Airdrie Town Centre;
• and the workshops and consultation work
(including community board briefings, on-line
plans and questionnaire and a 6-week exhibition
held within Airdrie library which also incorporated
opportunity for one-to-one drop-in sessions) that
has allowed local communities to comment on
plans and bring forward proposals for change.
The general feedback from this consultation was as
follows:
• it was recognised that given current retail trends,
alternative options need to be developed for our
town centres;
• general support was given for the Council’s goals
to promote and enable town centre living;
• the importance of the heritage fabric of our towns
was highlighted and a demand to, where possible,
repurpose and reuse historic buildings rather than
replace these; and
• good transport and access links to our town
centres was seen as vital to success of our towns.
It should be noted that as part of the consultation
process, there was limited input received from retailers,
the business community in general. It is, however,
intended that the Council will undertake further
consultation on the Town Action Plans with local
communities and stakeholders (including targeting local
businesses) as part of future reviews and updates of
these plans.
14
Town Action Plan Airdrie
Page 49 of 312

Page 50

A Vision for our
Towns
Some of our town centres face difficulties.
Built around a twentieth century model of
primary retail, they have been challenged by
the rise of online and out-of-town shopping.
How do towns survive as retail gradually
moves away and how can the council
reimagine our towns?
The answer is to reposition town centres as mixed-use spaces. Only by shifting the
focus from retail-driven town centres to a broader mix of investment, and promoting
town centre living, can our towns have a sustainable future.
The council can bring about this change by positioning local services in towns and
communities. By doing so, local people can have direct access to services they need
and staff can be closer to the communities they work in.
This is about more than niche retail, developing the evening economy or increasing
leisure opportunities. These must be living towns, with a much stronger focus on
newbuild housing and residential conversion and the repurposing and reuse of our
existing buildings in order to help address the decline of the built environment.
Town Action Plan Aidrie
15
Page 50 of 312

Page 51

The Town Visions for all eight of North Lanarkshire’s Town Centres were approved
by the Council’s Policy & Strategy Committee in September 2021, detailing
concept designs for our towns and forming the foundation of our Town Action
Plans.
Crucially, the Town Visions join together with Town and Community Hubs and
our Country Parks for the Future programmes to create a coherent, vibrant and
sustainable future for North Lanarkshire.
The Town Visions highlight proposals for each town and how each town could
function in the future. These recognise that one size does not fit all. Each of the
towns in North Lanarkshire has its own challenges and opportunities and its own
history and heritage.
A number of common themes have emerged in the development of these
prospectuses. For example, there is a need for residential development which uses
land no longer required for traditional retailing. Improving town centre access and
active travel and examining the needs of an older population living longer, are also
key considerations.
The Council can’t do this alone.
The Town Vision for Airdrie contained within is just that: A Vision.
To become a reality, the vision needs to be shaped through extensive
consultation and engagement with community planning partners, landowners,
retailers, residents, councillors and other agencies (via the development of the
Town Action Plan). The Vision should inform both public and private sector
investment.
The Town Vision represents a long-term strategy for transformation over a 20 year
period. It works alongside town centre projects that are planned for the short,
medium and long-term including regeneration projects, the acquisition of prominent
vacant and derelict buildings and sites, new council house construction and
infrastructure and access developments.
Town Action Plan Airdrie
Page 51 of 312

Page 52

The Vision
for Airdrie
17
Page 52 of 312

Page 53

The Vision for Airdrie
Airdrie’s vision is built around transformational
investment in the town’s infrastructure that will create
one of the best connected settlements in North
Lanarkshire. A more accessible and attractive centre
built around its ’market town’ qualities will attract new
homes and new investment celebrating the towns
heritage, character, scale and connectivity.
New transport connections created by rail, road and
the green network make Airdrie an easy and accessible
place to move around. Moreover, the development of
Airdrie Health Centre supports town centre liveability,
health and wellbeing and creates a cluster of
accessible services to address local needs. 
Airdrie with its improved access and connections offers
excellent opportunities for town centre living. The historic
centre with sensitive urban infill and potential building
conversions will provide a range of homes with good
access to local services and an attractive town centre
environment.
Improved access to public services, employment and
leisure facilities could also allow Airdrie to take advantage
of its location and place appeal as an important town
centre in North Lanarkshire. The development of the
New Monklands Hospital on the edge of Airdrie also has
the capacity to drive demand for town centre living and
the growth of leisure and hospitality uses as we capture
some of the buying power and needs of a new
workforce.
Airdrie also has a number of quality heritage buildings
which contribute to the townscape and history of the
town. In seeking to move Airdrie to a mixed-use town
centre through the stabilisation of the retail, leisure and
hospitality offering and promoting new town centre
living, the heritage estate presents an opportunity for
refurbishment to these new uses in a way that secures
the character of the town. 
Airdrie Opportunities
Town centres are facing a range of opportunities and
challenges as community needs and the way we use
our town centres change. Airdrie needs to adapt and
strengthen its role as an appealing and active centre
based on quality of place, enterprise, community
assets, heritage and the potential for low carbon living.
The core concept proposals outlined in the Vision
include:
• developing a new Town Hub for the delivery of
public services including education and leisure
uses.
• focusing investment in the town centre around the
cross and connections to the rail station.
• the creation of new active travel routes to link the
town centre to major community assets, other
towns and important greenspace such as 
Brownsburn Park.
• promoting a sense of place by securing long term
futures for heritage assets such as the Townhouse,
Airdrie library and the former Royal Bank of
Scotland; and
• promoting lifestyle appeal based on town centre
living locations adjacent to facilities, services and
places of interest.
18
Town Action Plan Airdrie
Page 53 of 312

Page 54

Town & Community Hubs
As part of the Council’s ambition for North Lanarkshire,
all schools constructed pre-1996 have been identified
for improvement or replacement. So that they can
be sustainable, we need to reduce the number of
building assets across North Lanarkshire, working with
communities and partners. As such, our town and
community hubs will in some places, be merged,  
co-located or combined and integrated with other
community and partnership assets. For example, there
may be a single campus for 2-18 year olds where early
learning, primary and secondary education is delivered
alongside other council and community services.
To design this model, we will use six guiding principles:
• Inclusive, universal provision: a hub must serve
the whole community and offer universal provision of
services as a default.
• Sense of community ownership: central to the
model is learning and teaching, but the hub must be
an asset for the whole community.
• Maximum availability and usage: hubs will operate
from early in the morning until late in the evening.
They must be multi-functional and must be able to be
used throughout the day.
• Designed with the community: options for design
should be shared as early as possible in the process
so that people in communities have ownership.
• Tailored, bespoke, representative: each hub will be
unique to ensure it meets specific community needs.
• Maximise services on offer: services available
within the hub should complement rather than
compete with services already serving the same
community.
TOWN
HUBS
COMMUNITY
HUBS
SMALL
COMMUNITY
HUBS
EARLY YEARS
FACILITIES
(council or
partnership
run)
PRIMARY
PROVISION
SECONDARY
PROVISION
ADDITIONAL
SUPPORT NEEDS
(ASN)
PROVISION
COMMUNITY
FACILITIES
PLAY
OLDER
ADULTS CAFÉ
GREENSPACE
RETAIL/
COMMERCIAL/
START-UP
OFFICES
FAMILY COUNCIL AND
PARTNER
STAFF
LEISURE HEALTH
SERVICES
EMPLOYABILITY
/ TRAINING LIBRARY
SPORT
(INDOOR AND/
OR OUTDOOR)
TRANSPORT
Hubs will have a form and facilities based on the need of the local community.
Zones which could be included are numerous and could be some or all of the following:
We envisage three types of hub:
Town hubs are likely to include primary and secondary education and an early years
facility. Other services on offer in town hubs will be larger in scale, such as more
comprehensive sport and leisure offerings, more significant outdoor sport provision and a
wider range of services.
Community hubs are likely to include at least one learning establishment and may
include other zones such as sport and leisure.
Small community hubs may exist in areas where there is no requirement for new
education facilities but where there is a need to replace older facilities such as libraries,
community centres or health facilities.
19
Page 54 of 312

Page 55

Airdrie Town Hub
Following a programme of public consultation, the
Council has identified the land in and around  
St Margaret’s HS and Airdrie Sports centre at
Rawyards off Motherwell Street (A73) as the preferred
site for the development of the Town Hub for Airdrie.
This site was short-listed for consideration as it is
owned by the Council, has sufficient land to
accommodate the footprint of the Town Hub campus
and is easily accessible. An active travel route will be
developed to link the Town Hub to the town centre via
the existing green corridor of Central Park.
The Council is currently seeking to secure the funding
to proceed with the design development of the Town
Hub and the associated statutory public consultation
around education provision (although this is likely to be
a long-term project). The hub would provide new state
of the art facilities for St Margaret’s High School and
associated primary schools.
99  20
Town Action Plan Airdrie
Page 55 of 312

Page 56

Retail
Whilst the ambition for all of our town centres is to
move towards a more mixed-use offering to improve
resilience and recognise the shift in how we use our
town centres, the Council wants to retain and support
the retail sector and assist it’s recovery from the double
impacts of an economic downturn and the covid
pandemic.
Research has shown that the independent retail sector
is more resilient to change than larger national multiples
and that these, in most cases local businesses, will
prevail if sufficient infrastructure and interest is in place.
We will therefore seek to support the retail sector in
Airdrie by, offering support to smaller and independent
shop owners in core retail areas of the town centre.
Funding constraints and legal issues do, however,
constrain the level of support which the Council can
provide. Support could nevertheless be provided
through small funding schemes such as shop-front
improvement grants.
Moreover, where vacancies occur, we will encourage
businesses to concentrate around the key retail node
within the town centre (with other premises being
promoted for conversion to residential use) in an effort
to sustain existing footfall within the core town centre
and create a more viable offer.
Commercial
The collapse in the demand for commercial premises
such as offices in town centre locations echoes wider
structural changes in the economy and the growth of
digital connectivity. The impacts of the covid pandemic
demonstrated the benefits and ease of remote working
across the public and private sector and led to an
exponential growth in homeworking with a resulting
impact on footfall within the town centre.
This needs to be recognised in how we change the
structure of Airdrie town centre and make best use of
the vacant premises which occur as a result of lower
demand and need for town centre office space. In
addition, moving forward, the commercial space which
remains also needs to be more accessible and energy
efficient to compete with out of town locations with
consideration given to how we measure the scale of
this challenge and take forward the repurposing of
vacant office space.
Leisure & Hospitality
The leisure and hospitality sector is a key component
of the move towards a more mixed-use town centre.
The importance of ‘Place’ in terms of the public’s
perception of character and safety is very important in
attracting people to use existing leisure and hospitality
businesses. Ease of movement to and from these uses
will encourage people to access the town centre for
leisure activities and  sustain and develop the nighttime
economy and footfall. In meeting this aim, the Town
Action Plan for Airdrie aims to promote active travel
routes and transport options to support access to
Economic Prosperity & Stability
town centre facilities and build footfall that will help
these sectors to grow.
21
Page 56 of 312

Page 57

Image: Former Broomknoll Parish Church
22
Town Action Plan Airdrie
Page 57 of 312

Page 58

New Build
Encouraging more people to live in town centres is
a key policy aspiration for the Council underpinning
priorities around sustainability, net zero, inclusion and
wellbeing. More people living in town centres means
more support for local businesses. It means keeping
bus routes active, a safer place thanks to passive
policing and greater local interest in the town centre
environment. These all make a town more attractive to
people living here.
Admittedly, developers looking to offer housing
options within town centres find that they are typically
more expensive, riskier, and take longer than other
housebuilding options. Town centre projects also
tend to be smaller, providing less financial return.
However, the Council is of the view that the overall
gains  outweigh risks and costs if we take into account
the wider societal benefits such as improved wellbeing
and a reduction in carbon footprint. Key to helping
to deliver this is identifying how the Council de-risks
and enables such development through, for example,
providing development support (e.g. via the Council’s
Invest in North Lanarkshire’s Programme of Work) or
promoting development opportunity through agreeing
upfront to buy off-the-shelf housing being proposed
by the private sector (or an agreed percentage of
the proposed housing) in order to gaurantee sales.
Town Centre Living
For example, the former Orr’s Department store
development is seen as an approach which could set
the tone for future housing developments within the
town centre.This is a private sector investment where
the Council has agreed to purchase the new flats being
developed on the site of this former store for long-term
affordable housing. This type of joint venture between
the Council and the private sector is seen as a key
model for delivery of town centre living across North
Lanarkshire including in Airdrie.
The Council hopes that by taking the lead in the
delivery of town centre living, we can make the case
that there is a latent demand for good quality town
centre houses and encourage the private sector to
invest. Private sector investment and development is
important to ensure both tenure and design diversity
so that we can, over time, improve the townscape and
character of the town centre.
Image: Former Orr’s Department Store
23
Page 58 of 312

Page 59

Refurbishment
The Council is also actively seeking to replace
redundant and in some cases derelict properties within
the town centre to residential development to ensure
that we respond to issues of vacancy and dereliction in
order to maintain the character of the town centre and
to promote its place function.
It is hoped that private owner occupiers and landlords
will recognise both the environmental and financial
benefits of the refurbishment of existing properties over
the long-term.
Improving the thermal efficiency of existing properties
is in most cases easier than demolition and new build
where ownerships are complex. It can be argued that
refurbishment as opposed to demolition and new build
is more sustainable in terms of the carbon footprint,
but more importantly, it retains the character of the
townscape as it preserves the urban grain of the
streetscape and gives a unique sense of place to each
town centre.
The Council itself has also identified a number of
existing properties within Airdrie Town Centre that are
in need of refurbishment due to long term vacancy or
neglect. Where the building design contributes to the
townscape we will endeavour to retain and refurbish
the building towards a mixed use, with retail on the
ground floor and residential uses on the upper floors
(within the retail core area) and exclusively residential
outwith the core retail areas.
Heritage Refurbishment
The communities’ perception of ‘Place’ is informed
by the quality of the public realm and key heritage
buildings. Airdrie Town Centre has a number of heritage
properties which are functionally obsolete but of good
quality and whose external appearance contributes to
the character and history of Airdrie.
Key buildings on the Main Street include, for example,
the former Royal Bank of Scotland and the Treasury
Bar both of which are seeking a new purpose and
function. Such buildings make a significant contribution
to the townscape and it could be argued that the Main
Street would be poorer if they are not repurposed as
they could fall into disrepair leading to demolition.
We would encourage the owners of listed buildings
who are considering the future of their building(s) to
approach the Council to discuss ways in which the
properties can contribute to the vision of a mixed-use
town centre. The Council has recent experience in
working with external organisations such as Historic
Environment Scotland and RSL Partners to refurbish
such buildings towards a viable future use. This
includes, for example, the former Broomknoll Church in
Airdrie where the Council provided financial support to
allow this historic building to be repurposed for housing
by Clyde Valley Housing Association.
Tower Reprovisioning
North Lanarkshire’s Towers Reprovisioning Programme
is seeking to demolish all high-rise towers and selected
low-rise block properties across North Lanarkshire
and replace them with quality flatted, terraced and
semi-detached housing to meet the needs of the local
community.
In the first phase of these works, the low-rise
properties at Northburn and Holehills in Airdrie have
been replaced whilst the second phase of works (to
be delivered over the next 3-5 years) will include the
replacement of low-rise blocks at Kennedy Drive (4
blocks), Kippen Street (7 blocks) and Glencraig Street
(1-19). Whilst the footprint of these low-rise blocks
will provide housing for some former tenants, the
reprovisioning of existing properties and construction
of new residential development within the town centre
offers an opportunity to rehouse those tenants, helping
to repopulate the centre and bring them closer to key
facilities and services which our communities require.
24
Town Action Plan Airdrie
Page 59 of 312

Page 60

Image: Exemplars of modern residential flatted development
25
Page 60 of 312

Page 61

Movement & Active Travel
26
Town Action Plan Airdrie
Page 61 of 312

Page 62

Public Transport
Town centres are hubs for transport interchanges
with Airdrie having strong rail network and bus service
links. Developing the points of interchange, making
public transport more accessible, appealing and
environmentally responsive are key considerations
within the Airdrie Town Action Plan.
As already highlighted, Airdrie rail station is one of
the three busiest passenger train stations in North
Lanarkshire. The council will enter into discussions
with Scotrail and Strathclyde Passenger Transport
to consider the options for the development of an
improved transport interchange around the rail station,
potentially enhancing transitions between rail and
bus and increasing car parking capacity to promote a
switch from private car travel to public transport as part
of our commitment to a low carbon future.
Securing net zero and developing a carbon neutral
economy will require the need to travel to be reduced.
Radical solutions are required based on reduced
car travel, the development of stronger active travel
infrastructure and piloting new initiatives around
20-minute neighbourhoods.
Active Travel
Active travel (walking, wheeling and cycling) has many
environmental benefits, as well as improved health
and wellbeing, and is a core part of rebalancing the
transport modes within our town centres. The town
centre as a focus for active travel activity needs to be
driven by connecting the town to facilities and services
as well as the surrounding area. As such, developing
active travel routes between Airdrie and other nearby
towns and communities as well as other key facilities
and locations, such as the proposed town hub, local
schools and greenspace (e.g. Brownsburn Park), are
seen as a central priority of the Action Plan.
Movement & Active Travel
Prioritising Sustainable Transport
Walking and wheeling
Cycling
Public Transport
Taxis & Shared transport
Private Car
27
Page 62 of 312

Page 63

Built Heritage & Place
From Top Left: Airdrie Townhouse, Airdrie Health Centre, Cairnhill Parish Church, Former Broomknoll Parish Church, One Wellwynd, Airdrie Library & Observatory
28
Town Action Plan Airdrie
Page 63 of 312

Page 64

Built Heritage
Airdrie is a historic market town which has made
important contributions to banking, culture and
industry. The legacy of this rich history can also be
seen in Airdrie’s built environment, with its town centre
a designated conservation area boasting numerous
listed and other historic buildings. External funding
opportunities for built heritage in town centres
has recently been made available through two
complementary funding programmes run by Historic
Environment Scotland (HES) and the National Lottery
Heritage Fund (NLHF). NLC submitted development
phase applications to these funders for a project
entitled ‘Rediscovering Airdrie: the heritage-led
regeneration of Airdrie Town Centre’. In 2023 it was
announced that NLC’s development phase application
had been successful with a full project bid now being
worked up for submission in 2024.
Rediscovering Airdrie aims to rediscover and celebrate
the history of Airdrie and use it and the town’s historic
built environment as a catalyst for physical, social and
economic regeneration, connecting people with their
heritage and establishing Airdrie as a vibrant centre of
creativity, culture, enterprise and learning. It will do so
through two inter-related programmes
• a series of physical interventions aimed at restoring
and repurposing heritage assets and improving the
townscape and ‘Built Heritage & Place’.
Built Heritage & Place
• a series of heritage activities aimed at engaging
with a wide range of residents and visitors alike,
connecting them with Airdrie’s heritage, bringing
interest and investment into the town and
improving educational, health and wellbeing and
economic outcomes.
Proposed physical interventions (subject to funding
approval) include the repurposing of Airdrie Town
House to establish a new centre for culture and studio
space aimed at the creative sector businesses, works
to improve the rooftop observatory at Airdrie Library
and the refitting of One Wellwynd to support the
piloting of a Women’s Business Centre. The Council
also proposes to establish and administer funds to
support owners to improve shopfronts within the
core retail area of the town and to repair and maintain
tenement housing.
Place
When we speak of place we are talking about the
character and quality of the townscape which is a
key asset of our towns and comprises all publicly
accessible space (streets, squares and greenspace) for
people to come together and engage as a community.
We are seeking to promote a more inclusive place
promoting longer dwell time and increased town centre
footfall. Public use of town centres and increased
activity supports civic presence and improved security.
Actively used, thriving public space is both safer, and
more welcoming than unused space.
In helping to improve space within our town centres,
and in direct response to the requirement’s of
Scotland’s National Planning Framework 4, the Council
is currently preparing an Open Spaces Strategy for
North Lanarkshire.
This strategy will assess existing open space and green
networks and help guide how we manage and meet
the need for openspace in town centres such as Airdrie
in the future. Future reviews of the Action Plan will give
cognisance to the findings of this emerging strategy
and help guide how we shape our openspace going
forward.
Airdrie Townhouse
29
Page 64 of 312

Page 65

66 
30
Town Action Plan Airdrie
Page 65 of 312

Page 66

Carbon Reduction
Town Centres have a key role in supporting a
sustainable future and contributing to the essential
adaptation necessary to address climate change
and our commitment to net zero. Place shaping can
help contribute to climate change targets through
the repurposing of buildings; developing 20-minute
neighbourhoods, reducing the need to travel and
supporting flood mitigation.
Key measures within the vision for supporting carbon
reduction in Airdrie will include:
• property upgrading, retrofit and re-purposing
(making these more energy efficient);
• developing active travel infrastructure;
• greening activity;
• extending EV Charging infrastructure; and
• planning for compact urban centres and
accessible services.
The carbon cost of demolishing existing buildings
and then developing new buildings is also in most
cases higher than the carbon cost of refurbishment
and adaption of buildings to new uses. The Council
will, where possible, advocate and take forward the
adaption and reuse of buildings within the town centre,
rather than replacement, making them more energy
efficient and extending their viable use. This both
reduces our collective carbon footprint and retains the
heritage and character of the town. Buildings in scope
for such an approach to redevelopment include, for
example, Airdrie Town House and Coats House.
Transition to Net Zero
Green Blue Infrastructure
Planning needs to support local measures to minimise
the impact of intense rainfall events and to mitigate
flood risk while also designing-in flood resilient places.
Area wide measures may include, for example, green
corridors for storm water flows linked to new habitat
management measures and our active travel networks.
EV Charging Infrastructure
The Scottish Government’s requirement to phase out
the need for petrol and diesel vehicles by 2030 will
impact on our centres with charging and fast charging
points becoming part of the urban fabric.
From 5 June 2023, regulations also requires electric
vehicle charging to be installed for new buildings and
those subject to major renovation. This includes one
EV charge point socket to be provided for all new
housing and flats and in 10% of parking spaces for
non-domestic buildings where these have 10 car
parking spaces or more.
Added to this, in order to encourage and enable the
use of our towns, the council needs to take forward
the installation of EV charging points within our town
centres for general public use. At the moment work
is ongoing through the Glasgow City Region team on
behalf of all local authorities with a view to engaging a
provider to install and operate our EV charging going
forward.  As part of this, the intention would be for
the provider to agree proposed sites with the Council,
located at key points that will meet future demand and
need of town centre users.
The Council will adopt the guidance set out in the
revised Building Regulations regarding EV charging
points within new developments. The council will also
investigate the roll out of EV charging within public car
parks and public facilities.
31
Page 66 of 312

Page 67

Other Considerations
Finance & External Funding
It has been well publicised that over the next three
years, North Lanarkshire Council (along with other
public services across Scotland) face significant budget
cuts. As such, investment made through the Town
Action Plan has to ensure that ongoing future revenue
or operational costs associated with any works is
minimal and, where possible, additional revenue
generated through, for example, increased rents or
business rates.
Moreover, to reduce the burden on the Council’s
available capital, the Council will look to fund such
works by alternative means through: promoting
and seeking private sector investment; use of North
Lanarkshire’s Housing Revenue Account; and sourcing
funding through Scottish Government Programmes
(such as the Place Based Investment Programme and
Regeneration Capital Grant Fund Programme), the
UK Government (with funding recently received for
Cumbernauld and Coatbridge Town Centres through
their Levelling Up Fund and Town Fund programmes
respectively) or other funders (such as the National
Heritage Lotter Fund).
Community Wealth Building
The Town Action Plan for Airdrie has been developed
in consultation with local communities to help identify
the key actions which we want to take forward to help
improve and regenerate Airdrie Town Centre. However,
in order to drive and sustain real change, it is critical
that local communities buy in to and take ownership of
these plans.
Community Wealth Building is designed to harness
the economic leverage of local ‘anchor’ organisations
to tackle long-term systematic challenges within local
communities and help to change the way we manage
and provide local services through, for example,
community-owned assets, a focus on local supply
chains and local job creation – key goals which need to
be embedded as part of the delivery of the Action Plan.
Communications Plan
It has been identified that the Action Plan affects four
key stakeholder groups:
• local communities and residents living in the town
centre (with the viability of the centre dependent
upon being able to attract local people to use the
town and sustain local spend);
• local businesses and shops (with retailers
particularly interested in opportunities which may
be brought forward through the plan, how change
will affect their business and how works may
disturb trade);
• potential visitors to Airdrie and people who live
outwith Airdrie but work within the town centre
(both of whom will contribute to spend and the
local economy); and
• the council and other public bodies (who will lead
on and contribute to the delivery of the plan).
Raising awareness of our plans for Airdrie is essential
to keeping these stakeholders engaged in the process
of transforming the town centre and securing their
buy in to the works being proposed. To ensure these
groups are fully informed, a detailed Communications
Plan will be developed for Airdrie Town Centre to make
sure proposals are shared and stakeholders kept
updated on progress made.
As part of this Communications Plan, the Council aim
to host a bespoke ‘Town’s Page’ for each of the main
towns across North Lanarkshire on its website. This
will incorporate news and information for each town
including copies of the Town Visions and Action Plans
and progress being made on the delivery of Action Plan
proposals.
32
Town Action Plan Airdrie
Page 67 of 312

Page 68

Section 3:
Airdrie Town Action Plan
Page 68 of 312

Page 69

Project Proposal Timescales*
Economic Prosperity & Stability
Shopfronts Implement a shopfront improvements grant scheme for
core retail areas within the town centre as part of the
Rediscovering Airdrie Project
Short-term
Orrs Develop two commercial units as part of the Orrs
development floorplate
Short-term
Town Centre
Audit & Demand
Analysis – Vacant
Office Space
Undertake an Audit and Demand Analysis for vacant
office space within Airdrie Town Centre to help develop
a strategy for the repurposing of this space
Short-term
One Wellwynd The refitting of One Wellwynd to support the piloting
of a Women’s Business Centre as part of the
Rediscovering Airdrie Project
Medium-term
Town Centre Living
Orrs The development of 20 residential units through
the private sector (to be purchased by NLC by their
‘Pathfinder’ scheme)
Short-term
Hogg Street The development of 36 residential units to be taken
forward by Trust Housing Assoc.
Short-term
Mill Loan The development of 16 residential units to be taken
forward by Clyde Valley Housing Assoc.
Short-term
Coats House Feasibility & Design works to assess potential
residential conversion (with particular focus on
provision for older people give proximity to Airdrie
Health Centre)
Short-term
Airdrie Police
Station
Liaison with Police Scotland to determine future
requirement for building/potential residential conversion
Short-term
Tenement
Improvements
Implement a grants scheme for repairs and
improvement to historic tenement properties as part of
the delivery of the Rediscovering Airdrie Project
Short-term
Buy-Backs Continuation of the Council’s ‘buy-back’ scheme to
offer affordable housing within Airdrie Town Centre
Ongoing
Town Action Plan Proposals
Project Proposal Timescales*
Movement & Active Travel
Active Travel The development of a design and costing study,
aligned to North Lanarkshire’s Active Travel Strategy,
to map out potential Active Travel Networks across
Airdrie Town Centre. At the same time, work will also
be undertake to source external funding to support the
delivery of this infrastructure
Short-term
Airdrie Transport
Interchange
Initial engagement with Scotrail and Strathclyde
Passenger Transport as part of the Local Transport
Strategy to explore the options for the development
of an improved transport interchange around the rail
station to improve transitions between rail and bus and
increase car parking capacity
Short-term
Built Heritage & Place
Airdrie Town
House
The potential repurposing of Airdrie Town House to
establish a new centre for culture and studio space
aimed at the creative sector businesses
Medium-Term
Airdrie Library &
Observatory
Explore works to improve and create a viewing
platform for the rooftop observatory at Airdrie Library
as part of the Rediscovering Airdrie Project
Medium-Term
Transition to Net Zero
EV Charging Site Investigations of NLC’s carparks across Airdrie
Town Centre to assess suitability/infrastructure needs
for EV Charging Installation as part of the delivery
proposals currently being developed through Glasgow
City Region
Long-Term
Town & Community Hubs
Airdrie Town Hub The development of Airdrie Town Hub (with the
preferred location identified at St. Margaret’s High
School/Airdrie Sports Centre)
Long-term
34
Town Action Plan Airdrie
Page 69 of 312

Page 70

The Action Plan Proposals Map
G
G
G
G
PT
PT
Core Retail Area
Area of Change
G
Potential New Public Sector Housing
Potential New Private Sector Housing
Recent Housing Developments
Potential Active Travel Route
Enhanced Public Transport Hub
Heritage assets
New Gateway Feature
(Town Centre Boundary)
Potential Electric Vehicle Charging
Infrastructure (Public Car Parks)
ONE WELLWYND
ORR’S DEPT. STORE
LIBRARY AND OBSERVATORY
POLICE STATION COATS HOUSE
THE TOWNHOUSE
35
Page 70 of 312

Page 71

3D Proposals Map
MAP TO FOLLOW
36
Town Action Plan Airdrie
Page 71 of 312

Page 72

Strategic Alignment
The Town Action Plan for Airdrie is aligned with 
The Plan for North Lanarkshire and other key
strategies, policies and plans.
ACTIVITIES
ECONOMIC
REGENERATION
DELIVERY PLAN
ENVIRONMENTAL STRATEGY
LOCAL DEVELOPMENT PLAN
LOCAL HOUSING STRATEGY
DIGITAL AND IT STRATEGY
TACKLING POVERTY STRATEGY
ACTIVE TRAVEL STRATEGY
THE
PLAN FOR
NORTH LANARKSHIRE
SHARED
AMBITION
Together this strategic policy framework ensures
that work is aligned with our priorities and enables
the required resources and working practices
needed to facilitate delivery of the shared
ambition.
Airdrie Town Action Plan will be reviewed on an
annual basis, not only to ensure that it remains
aligned to any new or emerging strategies
developed by the Council and its partners, but
also to make sure that any new opportunities can
be incorporated within the plan proposals and
any new issues arising within the town centre
addressed.
37
Page 72 of 312

Page 73

Notes
38
Town Action Plan Airdrie
Page 73 of 312

Page 74

Notes
39
Page 74 of 312

Page 75

This document can be made available in a range of
languages and formats, including large print, braille,
audio, electronic and accessible formats.
To make a request, please contact Corporate Communications
at: corporatecommunications@northlan.gov.uk
’S urrainn dhuinn an sgrìobhaidh seo a chur ann an diofar chànanan agus chruthan,
a’ gabhail a-steach clò mòr, braille, cruth claisneachd agus cruthan dealanach agus
ruigsinneach.
Gus iarrtas a dhèanamh, cuir fios gu Conaltradh Corporra aig: 
corporatecommunications@northlan.gov.uk
Niniejszy dokument można otrzymać w wielu różnych językach i formatach, w tym
również dużym drukiem, alfabetem Braille’a, w wersji dźwiękowej, elektronicznej i w
innych dostępnych formatach.
Prośby należy składać na ręce zespołu ds. komunikacji drogą elektroniczną na adres: 
corporatecommunications@northlan.gov.uk
此文件可以多种不同语言和格式提供,包括大字体、点字、音频、电子和易读格式。
如想提出请求,请联系企业传讯部:corporatecommunications@northlan.gov.uk
corporatecommunications@northlan.gov.uk
CC_2023_00011
Produced by
NORTH LANARKSHIRE COUNCIL
Growth Team
Place
Civic Centre
Motherwell
ML1 4AB
e. growthteam@northlan.gov.uk
NORTHLANARKSHIRE.GOV.UKPage 75 of 312

Page 76

Town Action Plan
Motherwell
Page 76 of 312

Page 77

Written, designed and produced by Corporate Communications, North Lanarkshire Council.
Design concepts provided by:
Ironside Farrar Ltd, Environmental Consultants - Town Vision design concepts
Norr, Architecture, Engineering, Planning and Design - Town and community hub design concepts
MAST Architects, - Town Centre Living concepts
All statistics and information correct at date of print: November 2023.
Page 77 of 312

Page 78

Contents
Introduction  .............................................................................. 5
SECTION 1: The Scale of the Challenge and Key Trends  .......... 7
SECTION 2: Key Considerations for Motherwell ......................... 13
A High Street for Everyone ......................................................... 14
A Vision for our Towns  .............................................................. 15
The Vision for Motherwell  .......................................................... 17
Town and Community Hubs  ..................................................... 19
Economic Prosperity & Stability  ................................................ 21
Town Centre Living  ................................................................... 23
Movement & Active Travel  ......................................................... 26
Built Heritage & Place  ............................................................... 28
Transition to Net Zero  ............................................................... 31
Other Considerations  ................................................................ 32
SECTION 3: Motherwell Town Action Plan  ................................ 33
Town Action Plan Proposals  ..................................................... 34
The Town Action Plan Proposals Map  ....................................... 35
3D Proposals Map  .................................................................... 36
Strategic Alignment  .................................................................. 37
Page 78 of 312

Page 79

Page 79 of 312

Page 80

Introduction
This is North Lanarkshire. This is
the place to Live, Learn, Work,
Invest and Visit. This is our vision.
We have come a long way. One of the fastest growing economies in
Scotland. The most ambitious council housebuilding programme in the
country. Record levels of infrastructure investment and dozens of new
schools. These are just a few examples.
The Plan for North Lanarkshire, approved in 2019, offered a clear way
forward. It offered a shared ambition for inclusive growth and prosperity
for all and we are delivering on that ambition.
We’re making huge progress, with investment and development
happening in all our towns and communities.
But what comes next? How do we deal with the undoubted challenges
that remain, like unacceptably high levels of deprivation and child poverty,
in-work poverty and areas of inequality across communities? How do we
become the agents of change for towns and communities to ensure they
have a sustainable future in the face of declining revenue budgets?
This vision for North Lanarkshire, as the place to Live, Learn, Work, Invest
and Visit is reflected in the Town Action Plan for Motherwell which
seeks to identify site specific proposals to deliver the concepts set out in
the vision.
The Town Action Plans been divided into three sections as follows:
Section 1: The scale of the challenge facing North Lanarkshire and the
key trends which are impacting on North Lanarkshire’s Town Centres.
Section 2: The key issues and opportunities which have helped formulate
proposals outlined in the Town Action Plan for Motherwell.
Section 3: The Town Action Plan Proposals.
5
Page 80 of 312

Page 81

6
Town Action Plan Motherwell
Page 81 of 312

Page 82

Section 1:
The Scale of the Challenge
and Key Trends
7
Page 82 of 312

Page 83

Key Trends
The following highlights the potential impact of economic, demographic,
technological and social trends on our towns.
RETAILING
Demand for UK retail space on our high street is now at its lowest since 2007,
with a move toward online retail as well as prime mixed-use locations (such as
Silverburn and Braehead) offering retail, leisure, entertainment and amenities,
whilst serving vibrant night-time economies. Our town centres are highly
vulnerable to weak footfall with a decline in retail sales across Scotland of 6.2%
since 2021 alone (following year on year drops over the last decade).
The inevitable reality is that fewer physical stores will be present on the high
streets of the future and that the role of those remaining stores will need to
evolve. On its current trajectory, it is estimated that physical retail sales across
our towns will fall by a further 35% over the next five years with a growing
reliance on convenience and discount retailers paying lower rents. We will see
consumers with lower disposable income and limited access to higher end
retail. North Lanarkshire in particular will be highly susceptible to this trend
where our towns are competing with bigger centres such as Glasgow and
Edinburgh for footfall and retail spending.
Both large and small scale operators also continue to struggle to adapt to the
growth in online shopping. UK consumers spend more online than any other
European country – accounting for 18% of all retail sales. It is projected that
35% of sales within the next few years will be online..
Store-based profit margins have more than halved over the last decade as
consecutive rises in business rates, the national living wage, the national
minimum wage and relative occupancy costs spiral upwards.
8
Town Action Plan Motherwell
Page 83 of 312

Page 84

LIVING
North Lanarkshire is home to over 341,000 people living
in more than 154,000 homes. The Council is Scotland’s
largest local authority landlord, owning and managing
more than 36,000 homes with a further 5,000 new
affordable homes by 2035.
Forecasts predict that the number of households will
rise by 1.5% (2,300) between now and 2028. However,
the local development plan promotes sufficient land for
more than 21,000 homes across North Lanarkshire.
Of our 154,000 homes, only circa. 1,500 - or just under
1% - are located within town centres with over half of
these built before 1919 and likely to require significant
future repair and maintenance. There is, however,
significant opportunity for residential development to
replace the contraction in retail. This is a key way of
helping to develop footfall within our town centres and,
in turn, creating a more viable (although reduced) retail
and commercial offer.
POPULATION
North Lanarkshire is currently home to around 6.3% of Scotland’s total
population. However, the number of deaths has exceeded the number
of births over the last three years although it is forecast that North
Lanarkshire’s total population will increase by 0.3% between 2018-
28 due primarily as a result of net inward migration.  In contrast, the
population of Scotland over the same time period is anticipated to grow
by 1.8%, demonstrating that North Lanarkshire is still failing in attracting
people to come and live here.
It is well established that economic growth is closely linked to population
growth. As such, to help make North Lanarkshire a more prosperous
place, it is essential that we provide the right type of housing and
environment that will make this a place where people already living in, or
moving to or within Scotland, want to relocate.
DEMOGRAPHICS
Children and young people aged 0-15 make
up almost one fifth of North Lanarkshire’s
population (18%) and this is forecast to
decrease to almost 16% by 2028.
Almost two thirds (64%) of North Lanarkshire’s
population are of working age  (16-64 year
olds). This is forecast to continue to decline in
the long-term.
The older adult population (aged 65+) accounts
for 18% of North Lanarkshire’s total population.
This is expected to increase so that, by 2028,
one in five (20%) of people living in North
Lanarkshire will be aged 65+.
This demographic change will have an impact.
Tax income is likely to fall because there will
be fewer people of working age, and care
responsibilities will increase. It is essential that
towns are designed to ensure that people are
able to live safely in their own homes for as long
as possible, homes are adaptable and flexible
and local services accessible.
9
Page 84 of 312

Page 85

CONNECTIVITY
We need to put transport and digital infrastructure in
place to ensure residents can access employment
and leisure as well as online opportunities and
services.
13.2% of Scotland’s motorway network is located
in North Lanarkshire, a place which has excellent
rail links to Glasgow and Edinburgh as well as
three of Scotland’s busiest passenger train stations
(Motherwell, Croy and Airdrie).
While transport links in and out of North Lanarkshire
are excellent, there are relatively poor transport
connections within the local authority area. The
development of the Pan Lanarkshire Orbital Transport
Corridor linking the M80, M8 and M74 will in part
address this issue, but the visions need to ensure
that our towns are designed as accessible and well-
connected places.
Road and rail use has grown significantly over recent
years but the number of bus journeys has declined by
approximately 23% which is significantly higher than
the Scottish  average of a 5% decline. Given that only
37% of households earning less than £10,000 can
access a private car compared to 97% of those who
earn more than £40,000, public transport is a key
issue for the people of North Lanarkshire.
Whilst a national conversation about the shape of
future public transport is required, particularly in terms
of cost, ticketing, coverage and responsiveness,
the Council needs to work with partners to identify
local gaps and how they can be filled through, for
example, community transportation and active
travel. This was a key recommendation of the
North Lanarkshire Fairness Commission and will be
subject to discussion as part of the development
of the emerging Local Transport Strategy for North
Lanarkshire.
The ban on the sale of new petrol or diesel cars after
2030, and a requirement for them to be off the road
by 2040, will also require significant investment in
infrastructure to support a shift in how we fuel our
private vehicles e.g. electric vehicle charging points
within car park’s and on streets and the development
of EV Hubs (fast charge sites) along key transport
corridors and within town centres.
DIGITAL ECONOMY
86% of UK households use the internet on a
daily basis and it is anticipated that this use will
continue to grow and drive demand for faster
and better quality access.
It is clear that good quality internet access will
be essential for future business development
and will underpin many areas of employment.
Whilst 98% of homes have access to superfast
broadband, the uptake of this is relatively low
due to the cost of access. The Council has
secured a digital partner, Commsworld, to take
this investment further, expand opportunity for
full-fibre and ultra-fast broadband and develop
more affordable access for all. This will include
delivery of these digital connections as part of
the planned development and regeneration
works across North Lanarkshire’s town centres.
10
Town Action Plan Motherwell
Page 85 of 312

Page 86

THE LOW CARBON AGENDA
A Scottish target of net zero for all greenhouse
gas emissions has been set for 2045. However, in
recognition of the importance of climate change,
the council declared a climate emergency in 2019,
committing it to reduce council carbon emissions
to net zero by 2030.
In particular, new zero carbon policy and
legislation will inform the way we design and build
new housing, or refurbish existing housing stock,
towards zero carbon. This includes:
INFRASTRUCTURE
New development within our town centres could in
part be constrained by existing infrastructure such
as energy, water and sewerage.
There is a need for early engagement with utility
providers to identify issues of capacity within
existing networks to ensure that the infrastructure
to support development within our town centres is
available at the right time and the right cost.
• ensuring all new housing uses renewable or
low carbon heating systems from 2024;
• ensuring all private rented housing achieve an
Energy Performance Certificate (EPC) Rating
of Band C or above by 2030;
• ensuring all socially rented housing achieve an
Energy Performance Certificate (EPC) Rating
of Band B or above by 2032; and
• developing an undertaking, where financially
and technically viable, to ensure all housing is
net zero carbon by 2045.
11
Page 86 of 312

Page 87

Page 87 of 312

Page 88

Section 2:
Key Considerations for Motherwell
Page 88 of 312

Page 89

22 
Wishaw
Rebalancing
RepopulatingRepositioning
Repurposing
Airdrie
A High Street for Everyone
A People Centred Approach
Our high streets offer a rich and authentic environment
that for generations has been the backdrop to the
ceremonies and memorable events of our community.
Furthermore, the health of our town centre reflect
the health of our wider community or society. An
energised town centre that is open to all and where
there is opportunity for improvement, will help
enrich the lives of our residents. It is critical that we
achieve a perception shift in our communities and
stakeholders and reposition the High Street at the
heart of the community. In doing so we are seeking to
develop a better town centre where the requirements
of all, regardless of age, ability or wealth, are
accommodated.
The following section outlines the key issues and
opportunities which have helped drive forward the
development of the Town Action Plan for Motherwell.
These key drivers have been identified from:
• the findings which were outlined in The Town
Centre Visions and Town & Community Hub plans
which were approved by Council in 2021 (as part
of the Council’s ‘The Place: The Vision’ strategy)
following an extensive programme of public
consultation;
• desktop research to assess the key challenges,
issues and opportunities which need to be
addressed or taken forward to help support the
transformational change of Motherwell Town
Centre;
• and the workshops and consultation work
(including community board briefings, on-line plans
and questionnaire and a 6-week exhibition held
within Motherwell library which also incorporated
opportunity for one-to-one drop-in sessions) that
has allowed local communities to comment on
plans and bring forward proposals for change.
The general feedback from this consultation was as
follows:
• it was recognised that given current retail trends,
alternative options need to be developed for our
town centres;
• general support was given for the Council’s goals
to promote and enable town centre living;
• the importance of the heritage fabric of our towns
was highlighted and a demand to, where possible,
repurpose and reuse historic buildings rather than
replace these; and
• good transport and access links to our town
centres was seen as vital to success of our towns.
It should be noted that as part of the consultation
process, there was limited input received from retailers,
the business community in general. It is, however,
intended that the Council will undertake further
consultation on the Town Action Plans with local
communities and stakeholders (including targeting local
businesses) as part of future reviews and updates of
these plans.
14
Town Action Plan Motherwell
Page 89 of 312

Page 90

A Vision for our
Towns
Some of our town centres face difficulties.
Built around a twentieth century model of
primary retail, they have been challenged by
the rise of online and out-of-town shopping. 
A key strategy among larger retailers and
banks is to reduce their high street presence.
How do towns survive as retail gradually
moves away and how can the council
reimagine our towns?
The answer is to reposition town centres as mixed-use spaces. Only by shifting the
focus from retail-driven town centres to a broader mix of investment, and promoting
town centre living, can our towns have a sustainable future.
The council can bring about this change by positioning local services in towns and
communities. By doing so, local people can have more direct access to services they
need and staff can be closer to the communities they work in.
This is about more than niche retail, developing the evening economy or increasing
leisure opportunities. These must be living towns, with a much stronger focus on new-
build housing, residential conversion and refurbishment that will address the decline of
the built environment.
15
Page 90 of 312

Page 91

Crucially, the Town Visions join together with Town and Community Hubs and
our Country Parks for the Future programmes to create a coherent, vibrant and
sustainable future for North Lanarkshire.
The Town Visions which follow are concepts, highlighting proposals for each town
and how each town could function in the future. These recognise that one size
does not fit all. Each of the towns in North Lanarkshire has its own challenges and
opportunities and its own history and heritage.
A number of common themes have emerged in the development of these
prospectuses. For example, there is a need for residential development which uses
land no longer required for traditional retailing. Improving town centre access and
active travel, and examining the needs of an older population living longer, are key
considerations.
The council can’t do this alone.
The Town Vision for Motherwell contained within is just
that: A Vision.
To become a reality, the vision needs to be shaped through
extensive consultation and engagement with community
planning partners, landowners, retailers, residents,
councillors and other agencies (via the development of the
Town Action Plan). The Vision should inform both public
and private sector investment.
The Town Vision represents a long-term strategy for transformation over a 20-year
period. It works alongside town centre projects that are planned for the short,
medium and long-term including regeneration projects, the acquisition of prominent
vacant and derelict buildings and sites, new council house construction and
infrastructure and access developments.
16
Town Action Plan Motherwell
16
Page 91 of 312

Page 92

The Vision
for
Motherwell
17
Page 92 of 312

Page 93

The Vision for Motherwell
Motherwell is Lanarkshire’s best-connected town.
It has a major opportunity to develop around its
role within the City Region as a key transport hub
with excellent connections to Edinburgh, Glasgow,
Scotland’s Central Belt and the rest of the UK.
Connectivity has been identified a key 21st century
driver for growth. High quality connections both
physical and digital are increasingly recognized as
essential requirements of commercially vibrant, low
carbon sustainable places.
With its rail, road and active travel networks,
Motherwell is a key investment location for commercial,
residential and regional services. The investment in the
new Town Hub, the improved Transport Interchange
around the rail station, the potential redevelopment of
the town centre to include new civic space and the
improved visitor experience at Strathclyde Country
Park will be transformational to Motherwell’s appeal
and sense of place.
The outcomes for the community will be a centre which
is more attractive, safer, easier to get around and offers
wider choices meeting diverse and local needs. New
homes, new jobs and better connections will drive
additional demand for services and sustain a more
vibrant and active town centre.
Motherwell’s connections, street pattern and
greenspace make for a town that can build resilience
and adaption to climate change, strengthen community
life and support health and wellbeing and low-carbon
living. Sustainable and SMART urban systems (Waste/
Drainage/5G-Wifi/Transport) will with other facilities
make Motherwell a place of choice.
Motherwell Opportunities
Town centres are facing a range of opportunities and
challenges as community needs and the way we use
our centres change. Motherwell needs to adapt and
strengthen its role as an appealing and liveable centre
based on quality of place, enterprise, community
assets, heritage and low carbon living.
The core projects incorporated within Motherwell Town
Vision include:
• developing a new Town Hub for the delivery of
public services including education, leisure and
health uses;
• focusing investment in the town centre around the
Cross, Merry Street and Brandon Parade South
with clear connections to the improved transport
interchange;
• the creation of new active travel routes to link
the town centre to major community assets such
as the Town Hub, Strathclyde Country Park,
Motherwell Train Station and Ravenscraig;
• sustaining a sense of place by securing long term
futures for heritage assets such as the former
Town Hall, the Masonic Hall and Motherwell Train
Station; and
• promoting lifestyle appeal based on town centre
living adjacent to services and places of interest.
18
Town Action Plan Motherwell
Page 93 of 312

Page 94

Town & Community Hubs
As part of the Council’s ambition for North Lanarkshire,
all schools constructed pre-1996 have been identified
for improvement or replacement. So that they can
be sustainable, we need to reduce the number of
building assets across North Lanarkshire, working with
communities and partners. As such, our town and
community hubs will in some places be merged, co-
located or combined and integrated with other community
and partnership assets. For example, there may be a
single campus for 2-18 year olds where early learning,
primary and secondary education is delivered alongside
other Council and community services.
To design this model, we will use six guiding principles:
• Inclusive, universal provision: a hub must serve
the whole community and offer universal provision of
services as a default.
• Sense of community ownership: central to the
model is learning and teaching, but the hub must be
an asset for the whole community.
• Maximum availability and usage: hubs will operate
from early in the morning until late in the evening.
They must be multi-functional and must be able to be
used throughout the day.
• Designed with the community: options for design
should be shared as early as possible in the process
so that people in communities have ownership.
• Tailored, bespoke, representative: each hub will be
unique to ensure it meets specific community needs.
• Maximise services on offer: services available
within the hub should complement rather than
compete with services already serving the same
community.
TOWN
HUBS
COMMUNITY
HUBS
SMALL
COMMUNITY
HUBS
EARLY YEARS
FACILITIES
(council or
partnership
run)
PRIMARY
PROVISION
SECONDARY
PROVISION
ADDITIONAL
SUPPORT NEEDS
(ASN)
PROVISION
COMMUNITY
FACILITIES
PLAY
OLDER
ADULTS CAFÉ
GREENSPACE
RETAIL/
COMMERCIAL/
START-UP
OFFICES
FAMILY COUNCIL AND
PARTNER
STAFF
LEISURE HEALTH
SERVICES
EMPLOYABILITY
/ TRAINING LIBRARY
SPORT
(INDOOR AND/
OR OUTDOOR)
TRANSPORT
Hubs will have a form and facilities based on the need of the local community.
Zones which could be included are numerous and could be some or all of the following:
We envisage three types of hub:
Town hubs are likely to include primary and secondary education and an early years
facility. Other services on offer in town hubs will be larger in scale, such as more
comprehensive sport and leisure offerings, more significant outdoor sport provision and a
wider range of services.
Community hubs are likely to include at least one learning establishment and may
include other zones such as sport and leisure.
Small community hubs may exist in areas where there is no requirement for new
education facilities but where there is a need to replace older facilities such as libraries,
community centres or health facilities.
19
Page 94 of 312

Page 95

Motherwell Town Hub
Following a consultation the general public chose
Ravenscraig as the preferred site for the development
of the Town Hub for Motherwell. This site was selected
as it has sufficient land to accommodate the footprint
of the Town Hub campus and is easily accessible
The Council is currently seeking to secure the funding
to proceed with the design development of the Town
Hub, the purchase of the site from Ravenscraig Ltd.
and the associated statutory public consultation
around education provision. No formal decision has
been taken as to which schools will be incorporated
into the town hub campus.
Community Hubs
Community Hub’s will be designed to be open and
accessible to the whole community, with predominately
school access during the day and the wider community
able to access many areas within the hub outwith
school hours.
The design of the recent Newmains community Hub
is seen as an exemplar for the development of future
Community Hubs in terms of its energy efficiency,
accessibility, quality of internal and external learning
environments and play facilities.
The Council will continue to review the physical
condition of its education estate to ensure they
continue to meet the needs of the wider community.
2299  20
Town Action Plan Motherwell
Page 95 of 312

Page 96

Retail
While the ambition for all of our town centres is to
move towards a more mixed use offering to improve
resilience and recognize the shift in how we use our
town centres, the Council wants to retain and support
the retail sector and assist it’s recovery from the double
impacts of an economic downturn and the Covid
Pandemic.
Research has shown that the independent retail sector
is more resilient to change than larger national multiples
and that these, in most cases local businesses, will
prevail if sufficient infrastructure and interest is in place.
We will therefore seek to support the retail sector in
Motherwell by encouraging the town centre owners
to refurbish larger vacant units into smaller units to
provide space for entrepreneurs and established
businesses to find the optimum premises for their
business.
Added to this, and given the fact that the retail sector in
the town centre is primarily under a single ownership,
the Council aim to work with the Motherwell Town
Centre owner to support the repurposing of vacant
units (including, where appropriate the demolition of
existing properties and redevelopment for alternative
use) and potential conversion of upper floor
commercial space to residential use, in order to help
create a more mixed-use centre. These discussions
with the town centre owner have already started and
are actively ongoing.
Funding constraints and legal issues do, however,
constrain the level of support which the Council can
provide. However, we are working with partners to
identify potential funding streams to promote business
investment and the regeneration of the key retail areas
within Motherwell.
Commercial
The collapse in the demand for commercial premises
such as offices in town centre locations echoes wider
structural changes in the economy and the growth of
digital connectivity. The impacts of the covid pandemic
demonstrated the benefits and ease of remote working
across the public and private sector and led to an
exponential growth in homeworking with a resulting
impact on footfall within the town centre.
This needs to be recognised in how we change the
structure of Motherwell Town Centre and make best
use of the vacant premises which occur as a result of
lower demand and need for town centre office space.
In addition, moving forward, the commercial space
which remains also needs to be more accessible and
energy efficient to compete with out-of-town locations
(with consideration given to how we measure the scale
of this challenge and take forward the repurposing of
vacant office space).
Although located just outwith the town centre,
Motherwell does also have a number of small industrial
sites within easy walking distance such as the Orbiston
Street and Braidhurst Industrial Estates. The Council
has recognised the importance of such provision for
local jobs and the economy and as such have invested
in the recent development of 14 new industrial units
at Orbiston Street and are about to start on the £7M
refurbishment and upgrade of Braidhurst Industrial
Estate (including the construction of 10 new start-up
units at this site and refurbishment of 6 existing units
owned and managed by North Lanarkshire Properties)
Economic Prosperity & Stability
Leisure & Hospitality
The leisure and hospitality sector is a key component
of the move towards a more mixed-use town centre.
The importance of ‘Place’ in terms of the public’s
perception of character and safety is very important in
attracting people to use existing leisure and hospitality
businesses. Ease of movement to and from the town
centre will encourage people to access leisure activities
and sustain and develop the night-time economy and
footfall. In meeting this aim, the Town Action Plan for
Motherwell aims to promote and sustain active travel
routes and transport options to support access to
town centre facilities and build footfall that will help the
leisure and hospitality sectors in Motherwell to grow.
21
Page 96 of 312

Page 97

Town Centre Living
88 
Refurbishment of the former Motherwell YMCA and New Build Flatted Blocks on Brandon Street (under construction)
22
Town Action Plan Motherwell
Page 97 of 312

Page 98

New Build
Encouraging more people to live in town centres is
a key policy aspiration for the Council underpinning
priorities around sustainability, net zero, inclusion and
wellbeing. More people living in town centres means
more support for local businesses. It means keeping
bus routes active, a safer place thanks to passive
policing and greater local interest in the town centre
environment. These all make a town more attractive to
people living here.
Admittedly, developers looking to offer housing
options within town centres find that they are typically
more expensive, riskier, and take longer than other
housebuilding options. Town centre projects also
tend to be smaller, providing less financial return.
However, the Council is of the view that the overall
gains outweigh risks and costs if we take into account
the wider societal benefits such as improved wellbeing
and a reduction in carbon footprint. Key to helping
to deliver this is identifying how the Council de-risks
and enables such development through, for example,
providing development support (e.g. via the Council’s
Invest in North Lanarkshire’s Programme of Work) or
promoting development opportunity through agreeing
up front to buy ‘off-the-shelf’ housing being proposed
by the private sector in order to guarantee sales.
This type of model has been used to promote private
sector housing investment elsewhere across North
Lanarkshire and has proved successful. As such, it is
very much viewed as a potential model which could
be used to support the delivery of town centre living
across the local authority area and its towns.
Town Centre Living
There are a number of new housing developments
currently being taken forward by the Council in
Motherwell Town Centre (including, for example,
Old Motherwell Town Hall and the former YMCA on
Brandon Street)
However, the Council also work closely with Registered
Social Landlords (RSLs) to bring forward new
affordable housing within town centres through the
provision of Housing Grant. Nevertheless, quite often,
the level of Housing Grant is not sufficient to meet
the higher costs associated with smaller town centre
developments. As such, the Council has previously
supported RSL’s to address this ‘cost-gap’ by
providing funding through programmes such as the
Council’s ‘Placed Based Investment Programme’ and
this is still very much seen as another possible route
for helping to enable the development of new build
housing within Town Centres.
Lastly, the Council hopes that by taking a leading role
in the delivery of town centre living, we can make the
case that there is a latent demand for good quality
town centre housing and encourage the private
sector to invest. Development by the private sector is
particularly important to ensuring that both tenure and
design diversity, over time, can improve the townscape
and character of the town centre.
Brandon Court
23
Page 98 of 312

Page 99

Refurbishment
The Council is actively seeking to replace redundant
properties within the town centre with residential
development to ensure that we respond to issues
of vacancy and dereliction. It also recognises
that, in many cases, the refurbishment of existing
buildings within the town, rather than demolition and
replacement, can not only reduce the carbon footprint
of development but also retain the character of the
townscape and help preserve a centre’s unique ‘sense
of place’.
The Council has identified a number of existing
properties within Motherwell Town Centre that are in
need of refurbishment due to long-term vacancy or
neglect. Where the building design contributes to the
townscape we will endeavour to retain and refurbish
the building towards a mixed use, with retail on the
ground floor and residential uses on the upper floors
(within the retail core area) and exclusively residential
outwith the core retail areas.
As already stated, we would hope that the private
sector will take the lead in reinvesting in its own stock
and we will aim to work closely with them in order to
support this.
Heritage Refurbishment
The communities’ perception of ‘Place’ is informed
by the quality of the public realm and key heritage
buildings. Motherwell Town Centre has a number of
heritage properties which are functionally obsolete
but of good quality and whose external appearance
contributes to the character and history of the town.
Key heritage buildings within the town centre include
the Old Town Hall on Hamilton Road, the former
Masonic Hall on Hope Street and the former YMCA on
Brandon Street all of which have been acquired by the
Council in recent years to be repurposed for residential
development (with works already started on the former
YMCA building).
These buildings make a significant contribution to
the townscape. Motherwell as a place would be
architecturally poorer if these were not refurbished
and subsequently fell into disrepair. Where the Council
do not own heritage buildings, we will support the
owners in their endeavours to secure a future for these
buildings by assisting in sourcing external grants and
funding.
As such, we would encourage the owners of listed
buildings who are considering the future of their
building(s) to approach the Council to discuss ways
in which the properties can contribute to the vision
of a mixed-use town centre. The Council has recent
experience of working with organisations such as
Historic Environment Scotland, external funders such
as the National Heritage Lottery Fund and delivery
partners to help take forward the regeneration of such
properties.
Town Centre Living
Tower Reprovisiong
North Lanarkshire’s Towers Reprovisioning Programme
is seeking to demolish all high-rise towers and selected
low-rise blocks across North Lanarkshire and replace
them with quality flatted, terraced and semi-detached
housing to meet the needs of the local community.
In the first phase of these works, the demolition of
Coursington Tower in Motherwell is now well underway.
The second phase of the Towers Programme will
include the demolition of seven high-rise towers in
Motherwell (Anderson Tower, Oakfield Tower, Albion
Tower, Airbles Tower, Whamond Tower, Glen Tower
and Woodside Tower) and one low-rise block (1-
56 McClurg Court) and their replacement with new
housing (with this phase of works to be delivered over
the next 3-5 years).
Whilst the footprint of these towers will provide
housing for some former tenants, the reprovisioning
of existing properties and construction of new
residential development within the town centre offers
an opportunity to rehouse those tenants who have to
relocate, helping to repopulate the centre and bringing
tenants closer to the key facilities and services which
they need.
24
Town Action Plan Motherwell
Page 99 of 312

Page 100

Exemplars of modern residential flatted development.
25
Page 100 of 312

Page 101

Movement & Active Travel
26
Town Action Plan Motherwell
Page 101 of 312

Page 102

Public Transport
Town centres are hubs for transport interchanges with
Motherwell having strong rail network and bus service
links which have been massively improved following
the recent upgrade of the Train Station entrance and
forecourt, the construction of improved bus and taxi
access and improved park and ride provision.
It is essential that Motherwell Town Centre builds on
this strength, with the Council working with Scotrail
and Strathclyde Passenger Transport to ensure good
and co-ordinated public transport connectivity to this
interchange, potential ‘SMART’ ticketing and well-
maintained park and ride facilities.
Active Travel
Active travel (walking, wheeling and cycling) has many
environmental benefits, as well as improved health
and wellbeing, and is a core part of rebalancing the
transport modes within our town centres. The town
centre as a focus for active travel activity needs to be
driven by connecting the town to facilities and services
as well as the surrounding area.
In particular, the Motherwell Transport Interchange
needs to act as a key spoke for the town’s active
travel routes, connecting people with facilities and
locations such as Ravenscraig (including New College
Lanarkshire, Ravenscraig Regional Sports Centre and
the proposed Town Hub), Wishaw General Hospital,
Strathclyde Country Park (including the Watersport’s
Centre and Bellshill Cycle Gateway and Pump Track)
and local business locations (such as Orbiston Street
and Braidhurst Industrial Estates – with a new route
from St. Vincent Place Park and Ride to Braidhurst
Industrial Estate already in place).
Lastly, the Council has recently installed a modular
Active Travel Hub at the Bellshill Cycle Gateway in
Strathclyde Country Park and are actively looking to
develop a further hub within the town centre (location
still to be identified) that will help improve access to
and from the Train Station as well as enhance links to
the Cycle Hub and facilities within the park.
Movement & Active Travel
27
Page 102 of 312

Page 103

Built Heritage & Place
33 
From the top left, Old Motherwell Town Hall, Brandon Paradfe South, Merry Street, The Masonic Hall, Art Deco building on Merry Street, Brandon Court Tower
28
Town Action Plan Motherwell
Page 103 of 312

Page 104

Built Heritage & Place
Built Heritage
North Lanarkshire’s towns have character. Distinctive in
form and heritage, the town centres are a reminder of
a positive and defining economic past (coal, iron, steel,
mills, quarrying) with many notable buildings.
The vision for Motherwell seeks to build on the
distinctive character and quality of place using this
legacy to reinforce urban form and repurpose heritage
buildings for new uses.
This includes a number of heritage buildings In
Motherwell Town Centre (Motherwell Old Town Hall,
the former YMCA and the former Masonic Hall) which
the Council has recently purchased for residential
development (with works already on site at the former
YMCA and due to start at Motherwell Old Town Hall
in 2024). However, as previously highlighted, the
Council also work with the private sector and partners
such as RSL’s to support the delivery of housing
projects (including for heritage projects with successful
partnership development previously supported for key
historic town centre buildings such as for the Carnegie
Library in Airdrie and Bromknol Church in Airdrie).
To replicate such activity in Motherwell, as part of the
delivery of Motherwell Town Action Plan, the Council
will identify other key vacant or underused heritage
properties in the town centre and work with owners
and partners to identify and help secure funding for the
repurposing of such buildings for housing, community
or other viable uses.
Place
When we speak of place we are talking about the
character and quality of the townscape which is a
key asset of our towns and comprises all publicly
accessible space (streets, squares and greenspace) for
people to come together and engage as a community.
We are seeking to promote Motherwell as a more
inclusive place, promoting longer dwell-time and
increased town centre footfall. Public use of town
centres and increased activity supports civic presence
and improved security. Actively used, thriving public
space is both safer, and more welcoming, than unused
space.
In helping to improve space within our town centres,
and in direct response to the requirement’s of
Scotland’s National Planning Framework 4, the Council
is currently preparing an Open Spaces Strategy for
North Lanarkshire.
This strategy will assess existing open space and
green networks and help guide how we manage and
meet the need for openspace in town centres such as
Motherwell. As such, future reviews of the Action Plan
will give cognisance to the findings of this emerging
strategy and help guide how we shape our openspace
going forward.
However, the Vision for Motherwell Town Centre
already identifies a need for improved ‘gateways’ to
the town centre, improving the aesthetical quality
of streetscape and creating ‘place quality’. These
identified gateways are at Motherwell Library, Brandon
Street and at Menteith Road with these to be improved
as part of the TAP proposals in the short-medium term. Tenements at corner of Muir Street
The former Co-op Building on corner of Dalziel Street
29
Page 104 of 312

Page 105

66 
30
Town Action Plan Motherwell
Page 105 of 312

Page 106

Carbon Reduction
Town Centres have a key role in supporting a
sustainable future and contributing to the essential
adaptation necessary to address climate change
and our commitment to net zero. Place shaping can
help contribute to climate change targets through
the repurposing of buildings; developing 20-minute
neighbourhoods, reducing the need to travel and
supporting flood mitigation.
Key measures within the vision for supporting carbon
reduction in Airdrie will include:
• property upgrading, retrofit and re-purposing (making
these more energy efficient);
• developing active travel infrastructure;
• greening activity;
• extending EV Charging infrastructure; and
• planning for compact urban centres and accessible
services.
The carbon cost of demolishing existing buildings and
then developing new buildings is also in most cases
higher than the carbon cost of refurbishment and
adaption of buildings to new uses. In recognition of
this, key buildings within Motherwell such as the Old
Town Hall and former YMCA are to be refurbished
rather than demolished with works making them more
energy efficient and extending their viable use. This
both reduces our collective carbon footprint and retains
the heritage and character of the town.
Transition to Net Zero
Green Blue Infrastructure
Planning needs to support local measures to minimise
the impact of intense rainfall events and to mitigate
flood risk while also designing flood resilient places.
Area wide measures may include, for example, green
corridors for storm water flows linked to new habitat
management measures and our active travel networks.
The Council is also currently working with Scottish
Water to develop a pilot study on a vacant and derelict
land site in Motherwell. This study is focusing on
ways to manage surface water infrastructure so that
additional pressures are not placed upon the existing
combined sewer network within our town centres.
Electric Vehicle (EV) Charging
The Scottish Government’s requirement to phase out
the need for petrol and diesel vehicles by 2030 will
impact on our centres with charging and fast charging
points becoming part of the urban fabric.
From 5 June 2023, the regulations also requires
electric vehicle charging to be installed for new
buildings and those subject to major renovation. This
includes one EV charge point socket to be provided for
all new housing and flats and in 10% of parking spaces
for non-domestic buildings where these have 10 car
parking spaces or more.
Added to this, in order to encourage and enable the
use of our towns, the Council needs to take forward
the installation of EV charging points within our town
centres for general public use. At the moment, work
is ongoing through the Glasgow City Region team on
behalf of all local authorities with a view to engaging a
provider to install and operate our EV charging going
forward. The intention would be for the provider to
agree proposed sites with the Council and install and
manage the EV charging provision on the Councils
behalf.
As part of the delivery of Motherwell Town Action Plan,
the Council will also investigate the suitability of our
public car parks and facilities for EV Charging and
their capacity to meet future demand and need for EV
charging within our town centres.
31
Page 106 of 312

Page 107

Other Considerations
Finance & External Funding
It has been well publicised that over the next three
years, North Lanarkshire Council (along with other
public services across Scotland) face significant budget
cuts. As such, investment made through the Town
Action Plan has to ensure that ongoing future revenue
or operational costs associated with any works is
minimal and, where possible, additional revenue
generated through, for example, increased rents or
business rates.
Moreover, to reduce the burden on the Council’s
available capital, the Council will look to fund such
works by alternative means through: promoting
and seeking private sector investment; use of North
Lanarkshire’s Housing Revenue Account; and sourcing
funding through Scottish Government Programmes
(such as the Place Based Investment Programme and
Regeneration Capital Grant Fund Programme), the
UK Government (with funding recently received for
Cumbernauld and Coatbridge Town Centres through
their Levelling Up Fund and Town Fund programmes
respectively) or other funders (such as the National
Heritage Lotter Fund).
Community Wealth Building
The Town Action Plan for Airdrie has been developed
in consultation with local communities to help identify
the key actions which we want to take forward to help
improve and regenerate Airdrie Town Centre. However,
in order to drive and sustain real change, it is critical
that local communities buy in to and take ownership of
these plans.
Community Wealth Building is designed to harness
the economic leverage of local ‘anchor’ organisations
to tackle long-term systematic challenges within local
communities and help to change the way we manage
and provide local services through, for example,
community-owned assets, a focus on local supply
chains and local job creation – key goals which need to
be embedded as part of the delivery of the Action Plan.
Communications Plan
It has been identified that the Action Plan affects four
key stakeholder groups:
• local communities and residents living in the town
centre (with the viability of the centre dependent
upon being able to attract local people to use the
town and sustain local spend);
• local businesses and shops (with retailers
particularly interested in opportunities which may
be brought forward through the plan, how change
will affect their business and how works may
disturb trade);
• potential visitors to Airdrie and people who live
outwith Airdrie but work within the town centre
(both of whom will contribute to spend and the
local economy); and
• the council and other public bodies (who will lead
on and contribute to the delivery of the plan).
Raising awareness of our plans for Airdrie is essential
to keeping these stakeholders engaged in the process
of transforming the town centre and securing their
buy in to the works being proposed. To ensure these
groups are fully informed, a detailed Communications
Plan will be developed for Airdrie Town Centre to make
sure proposals are shared and stakeholders kept
updated on progress made.
As part of this Communications Plan, the Council aim
to host a bespoke ‘Town’s Page’ for each of the main
towns across North Lanarkshire on its website. This
will incorporate news and information for each town
including copies of the Town Visions and Action Plans
and progress being made on the delivery of Action Plan
proposals.
32
Town Action Plan Motherwell
Page 107 of 312

Page 108

Section 3:
Motherwell Town Action Plan
33
Page 108 of 312

Page 109

Project Proposal Timescales*
Economic Prosperity & Stability
Braidhust
Industrial
Estate
Take forward the £7M regeneration of Braidhurst Industrial
Estate (including the construction of 10 new start-up units and
the refurbishment of 6 existing NLP units).
Short-term
Town Centre
Audit &
Demand
Analysis –
Vacant Office
Space
Undertake an Audit and Demand Analysis for vacant office
space within Motherwell Town Centre to help develop a
strategy for the repurposing of this space.
Short-term
Town Centre Living
Former YMCA/
Brandon Street
The refurbishment of the former YMCA (to incorporate 6 new
residential units) and the development of 43 additional residential
units on adjacent land to be taken forward by NLC.
Short-term
Masonic Hall The redevelopment of the former Masonic Hall as a façade
retention, and the construction of 11 new residential units to be
taken forward by NLC.
Medium-term
Motherwell
Old Town Hall
The refurbishment of the Motherwell Old Town Hall (to incorporate
20 new residential units) to be taken forward by  NLC.
Short-term
Coursington &
Draffen Street
The development of 60 residential units to be taken forward by
NLC.
Medium-
term
Leslie Street The development of 13 residential units to be taken forward by
Clyde Valley Housing Assoc.
Short-term
Buy-Backs Continuation of the Council’s ‘buy-back’ scheme to offer
affordable housing within Airdrie Town Centre.
Ongoing
Movement & Active Travel
Active Travel
Works
Take forward planned investment in Motherwell’s Active Travel
Network to include new routes from/to:
• Braidhurst Industrial Estate to Bellshill Cycling Hub
(Strathclyde Country Park)
• Hamilton road between Motherwell Town centre and
Strathclyde Country Park
• Hope Street/Muir Street to Milton Street and Pollock Street
• Motherwell Town Centre to Carfin (via Merry Street)
• West Hamilton Street to Camp Street
• Windmillhill Streetbetween Camp Street and Airbles Road
Town Action Plan Proposals
Project Proposal Timescales*
Active Travel
Study
The development of a design and costing study, aligned to
North Lanarkshire’s Active Travel Strategy, to map out potential
Active Travel Networks across Motherwell Town Centre.
This will focus on identifying ‘gaps’ within the existing and
planned network.
At the same time, work will also undertake to source external
funding to suppport the delivery of this infrastructure.
Short-term
Active Travel
Hub
The development of a Town Centre Active Travel (location to be
identified) including potential charghing points for e-bikes.
Built Heritage & Place
Heritage
Buildings
Take forward the refurbishment and conversion of the former
Masonic Hall (façade retention only), the former YMCA and
Motherwell Old Town Hall for affordable housing.
Short to
medium-
term
Heritage
Buildings
Identify key heritage buildings within town centre that are
vacant, underused or in poor condition and enter/continue
discussion with owners to identify roue for safeguarding,
improving or repurposing properties. This will include helping to
source funding for these regeneration initiatives.
Medium-
term
Motherwell
Library,
Brandon
Street and
Menteith Road
Undertake feasibility works to assess viability and costs for the
development of town gateway features.
Short-term
Transition to Net Zero
EV Charging Site Investigations of NLC’s carparks across Motherwell
Town Centre to assess suitability/infrastructure needs for EV
Charging Installation as part of the delivery proposals currently
being developed through Glasgow City Region.
Long-term
Town & Community Hubs
Motherwell
Town Hub
The development of Motherwell Town Hub. Long-term
*Short-term: 1-3 Years
*Medium-term: 3-7 years
*Long-term: 7+ years
34
Town Action Plan Motherwell
Page 109 of 312

Page 110

The Action Plan Proposals Map
G
G
G
G
PT
PT
Core Retail Area
Area of Change
G
Potential New Public Sector Housing
Potential New Private Sector Housing
Recent Housing Developments
Potential Active Travel Route
Enhanced Public Transport Hub
Heritage assets
New Gateway Feature
(Town Centre Boundary)
Potential Electric Vehicle Charging
Infrastructure (Public Car Parks)
35
Page 110 of 312

Page 111

3D Proposals Map
MAP TO FOLLOW
36
Town Action Plan Motherwell
Page 111 of 312

Page 112

Strategic Alignment
The Town Action Plan for Motherwell is aligned
with The Plan for North Lanarkshire and other key
strategies, policies and plans.
Together this strategic policy framework ensures
that work is aligned with our priorities and enables
the required resources and working practices
needed to facilitate delivery of the shared
ambition.
Motherwell Town Action Plan will be reviewed on
an annual basis, not only to ensure that it remains
aligned to any new or emerging strategies
developed by the Council and its partners, but
also to make sure that any new opportunities can
be incorporated within the plan proposals and
any new issues arising within the town centre
addressed.
ACTIVITIES
ECONOMIC
REGENERATION
DELIVERY PLAN
ENVIRONMENTAL STRATEGY
LOCAL DEVELOPMENT PLAN
LOCAL HOUSING STRATEGY
DIGITAL AND IT STRATEGY
TACKLING POVERTY STRATEGY
ACTIVE TRAVEL STRATEGY
THE
PLAN FOR
NORTH LANARKSHIRE
SHARED
AMBITION
37
Page 112 of 312

Page 113

Notes
38
Town Action Plan Motherwell
Page 113 of 312

Page 114

Notes
39
Page 114 of 312

Page 115

This document can be made available in a range of
languages and formats, including large print, braille,
audio, electronic and accessible formats.
To make a request, please contact Corporate Communications
at: corporatecommunications@northlan.gov.uk
’S urrainn dhuinn an sgrìobhaidh seo a chur ann an diofar chànanan agus chruthan,
a’ gabhail a-steach clò mòr, braille, cruth claisneachd agus cruthan dealanach agus
ruigsinneach.
Gus iarrtas a dhèanamh, cuir fios gu Conaltradh Corporra aig: 
corporatecommunications@northlan.gov.uk
Niniejszy dokument można otrzymać w wielu różnych językach i formatach, w tym
również dużym drukiem, alfabetem Braille’a, w wersji dźwiękowej, elektronicznej i w
innych dostępnych formatach.
Prośby należy składać na ręce zespołu ds. komunikacji drogą elektroniczną na adres: 
corporatecommunications@northlan.gov.uk
此文件可以多种不同语言和格式提供,包括大字体、点字、音频、电子和易读格式。
如想提出请求,请联系企业传讯部:corporatecommunications@northlan.gov.uk
corporatecommunications@northlan.gov.uk
CC_2023_00011
Produced by
NORTH LANARKSHIRE COUNCIL
Growth Team
Place
Civic Centre
Motherwell
Ml1 4AB
e. growthteam@northlan.gov.uk
NORTHLANARKSHIRE.GOV.UKPage 115 of 312

Page 116

Town Action Plan
Wishaw
Page 116 of 312

Page 117

Written, designed and produced by Corporate Communications, North Lanarkshire Council.
Design concepts provided by:
Ironside Farrar Ltd, Environmental Consultants - Town Vision design concepts
Norr, Architecture, Engineering, Planning and Design - Town and community hub design concepts
MAST Architecture - Town Living design concepts
All statistics and information correct at date of print: November 2023.
Page 117 of 312

Page 118

Contents
Introduction  .............................................................................. 5
SECTION 1: The Scale of the Challenge and Key Trends  .......... 7
SECTION 2: Key Considerations for Wishaw  ............................ 13
A High Street for Everyone ......................................................... 14
A Vision for our Towns  .............................................................. 15
The Vision for Wishaw  .............................................................. 15
Town and Community Hubs  ..................................................... 19
Economic Prosperity & Stability  ................................................ 21
Town Centre Living  ................................................................... 23
Movement & Active Travel  ......................................................... 26
Built Heritage & Place  ............................................................... 28
Transition to Net Zero  ............................................................... 31
Other Considerations  ................................................................ 32
SECTION 3: Airdrie Town Action Plan  ....................................... 33
Town Action Plan Proposals  ..................................................... 34
The Town Action Plan Proposals Map  ....................................... 35
3D Proposal Map  ..................................................................... 36
Strategic Alignment  .................................................................. 37
Page 118 of 312

Page 119

Page 119 of 312

Page 120

Introduction
This is North Lanarkshire.
This is the place to Live,
Learn, Work, Invest and
Visit. This is our vision.
We have come a long way. One of the fastest growing economies in Scotland.  
The most ambitious council housebuilding programme in the country. Record levels of
infrastructure investment and dozens of new schools. These are just a few examples.
The Plan for North Lanarkshire, approved in 2019, offered a clear way forward.
It offered a shared ambition for inclusive growth and prosperity for all and we are
delivering on that ambition.
We’re making huge progress, with investment and development happening in all our
towns and communities.
But what comes next? How do we deal with the undoubted challenges that remain,
like unacceptably high levels of deprivation and child poverty, in-work poverty and
areas of inequality across communities? How do we become the agents of change
for towns and communities to ensure they have a sustainable future in the face of
declining revenue budgets?
This vision for North Lanarkshire, as the place to Live, Learn, Work, Invest and Visit is
reflected in the Town Action Plan for Wishaw which seeks to identify site specific
proposals to deliver the concepts set out in the vision.
The Town Action Plans been divided into three sections as follows:
Section 1: The scale of the challenge facing North Lanarkshire and the key trends
which are impacting on North Lanarkshire’s Town Centres.
Section 2: The key issues and opportunities which have helped formulate proposals
outlined in the Town Action Plan for Wishaw.
Section 3: The Town Action Plan Proposals.
5
Page 120 of 312

Page 121

Page 121 of 312

Page 122

Section 1:
The Scale of the Challenge
and Key Trends
Page 122 of 312

Page 123

Key Trends
The following highlights the potential impact of economic, demographic,
technological and social trends on our towns.
RETAILING
Demand for UK retail space on our high street is now at its lowest since 2007,
with a move toward online retail as well as prime mixed-use locations (such as
Silverburn and Braehead) offering retail, leisure, entertainment and amenities,
whilst serving vibrant night-time economies. Our town centres are highly
vulnerable to weak footfall with a decline in retail sales across Scotland of 6.2%
since 2021 alone (following year on year drops over the last decade).
The inevitable reality is that fewer physical stores will be present on the high
streets of the future and that the role of those remaining stores will need to
evolve. On its current trajectory, it is estimated that physical retail sales across
our towns will fall by a further 35% over the next five years with a growing
reliance on convenience and discount retailers paying lower rents. We will see
consumers with lower disposable income and limited access to higher end
retail. North Lanarkshire in particular will be highly susceptible to this trend
where our towns are competing with bigger centres such as Glasgow and
Edinburgh for footfall and retail spending.
Both large and small scale operators also continue to struggle to adapt to the
growth in online shopping. UK consumers spend more online than any other
European country – accounting for 18% of all retail sales. It is projected that
35% of sales within the next few years will be online..
Store-based profit margins have more than halved over the last decade as
consecutive rises in business rates, the national living wage, the national
minimum wage and relative occupancy costs spiral upwards.
8
Town Action Plan Wishaw
Page 123 of 312

Page 124

LIVING
North Lanarkshire is home to over 341,000 people living
in more than 154,000 homes. The Council is Scotland’s
largest local authority landlord, owning and managing
more than 36,000 homes with a further 5,000 new
affordable homes by 2035.
Forecasts predict that the number of households will
rise by 1.5% (2,300) between now and 2028. However,
the local development plan promotes sufficient land for
more than 21,000 homes across North Lanarkshire.
Of our 154,000 homes, only circa. 1,500 - or just under
1% - are located within town centres with over half of
these built before 1919 and likely to require significant
future repair and maintenance. There is, however,
significant opportunity for residential development to
replace the contraction in retail. This is a key way of
helping to develop footfall within our town centres and,
in turn, creating a more viable (although reduced) retail
and commercial offer.
POPULATION
North Lanarkshire is currently home to around 6.3% of Scotland’s total
population. However, the number of deaths has exceeded the number
of births over the last three years although it is forecast that North
Lanarkshire’s total population will increase by 0.3% between 2018-
28 due primarily as a result of net inward migration.  In contrast, the
population of Scotland over the same time period is anticipated to grow
by 1.8%, demonstrating that North Lanarkshire is still failing in attracting
people to come and live here.
It is well established that economic growth is closely linked to population
growth. As such, to help make North Lanarkshire a more prosperous
place, it is essential that we provide the right type of housing and
environment that will make this a place where people already living in, or
moving to or within Scotland, want to relocate.
DEMOGRAPHICS
Children and young people aged 0-15 make
up almost one fifth of North Lanarkshire’s
population (18%) and this is forecast to
decrease to almost 16% by 2028.
Almost two thirds (64%) of North Lanarkshire’s
population are of working age  (16-64 year
olds). This is forecast to continue to decline in
the long-term.
The older adult population (aged 65+) accounts
for 18% of North Lanarkshire’s total population.
This is expected to increase so that, by 2028,
one in five (20%) of people living in North
Lanarkshire will be aged 65+.
This demographic change will have an impact.
Tax income is likely to fall because there will
be fewer people of working age, and care
responsibilities will increase. It is essential that
towns are designed to ensure that people are
able to live safely in their own homes for as long
as possible, homes are adaptable and flexible
and local services accessible.
9
Page 124 of 312

Page 125

CONNECTIVITY
We need to put transport and digital infrastructure in
place to ensure residents can access employment
and leisure as well as online opportunities and
services.
13.2% of Scotland’s motorway network is located
in North Lanarkshire, a place which has excellent
rail links to Glasgow and Edinburgh as well as
three of Scotland’s busiest passenger train stations
(Motherwell, Croy and Airdrie).
While transport links in and out of North Lanarkshire
are excellent, there are relatively poor transport
connections within the local authority area. The
development of the Pan Lanarkshire Orbital Transport
Corridor linking the M80, M8 and M74 will in part
address this issue, but the visions need to ensure
that our towns are designed as accessible and well-
connected places.
Road and rail use has grown significantly over recent
years but the number of bus journeys has declined by
approximately 23% which is significantly higher than
the Scottish  average of a 5% decline. Given that only
37% of households earning less than £10,000 can
access a private car compared to 97% of those who
earn more than £40,000, public transport is a key
issue for the people of North Lanarkshire.
Whilst a national conversation about the shape of
future public transport is required, particularly in terms
of cost, ticketing, coverage and responsiveness,
the Council needs to work with partners to identify
local gaps and how they can be filled through, for
example, community transportation and active
travel. This was a key recommendation of the
North Lanarkshire Fairness Commission and will be
subject to discussion as part of the development
of the emerging Local Transport Strategy for North
Lanarkshire.
The ban on the sale of new petrol or diesel cars after
2030, and a requirement for them to be off the road
by 2040, will also require significant investment in
infrastructure to support a shift in how we fuel our
private vehicles e.g. electric vehicle charging points
within car park’s and on streets and the development
of EV Hubs (fast charge sites) along key transport
corridors and within town centres.
DIGITAL ECONOMY
86% of UK households use the internet on a
daily basis and it is anticipated that this use will
continue to grow and drive demand for faster
and better quality access.
It is clear that good quality internet access will
be essential for future business development
and will underpin many areas of employment.
Whilst 98% of homes have access to superfast
broadband, the uptake of this is relatively low
due to the cost of access. The Council has
secured a digital partner, Commsworld, to take
this investment further, expand opportunity for
full-fibre and ultra-fast broadband and develop
more affordable access for all. This will include
delivery of these digital connections as part of
the planned development and regeneration
works across North Lanarkshire’s town centres.
10
Town Action Plan Wishaw
Page 125 of 312

Page 126

THE LOW CARBON AGENDA
A Scottish target of net zero emissions of all
greenhouse gas has been set for 2045. However,
in recognition of the importance of climate change,
the council declared a climate emergency in 2019,
committing it to reduce council carbon emissions to
zero by 2030.
New legislation across a number of sectors including
transportation and housing will inform the way we
design new housing and the refurbishment of our
existing housing stock towards zero carbon through
legislative and policy requirements such as:
INFRASTRUCTURE
New development within our town centres could in
part be constrained by existing infrastructure such
as energy, water and sewerage.
There is a need for early engagement with utility
providers to identify issues of capacity and
networks to ensure that the infrastructure to
support the development of houses within our
town centres is available at the right time and the
right cost.
-  ensuring all new housing uses renewable or low
carbon heating systems from 2024;
-  ensuring all private rented housing achieve an
Energy Performance Certificate (EPC) Rating of
Band C or above by 2030;
-  ensuring all socially rented housing achieve an
Energy Performance Certificate (EPC) Rating of
Band B or above by 2032; and
-  developing an undertaking, where financially
and technically viable, to ensure all housing is
net zero carbon by 2045.
11
Page 126 of 312

Page 127

12
Town Action Plan Aidrie
Page 127 of 312

Page 128

Section 2:
Key Considerations for Wishaw
Page 128 of 312

Page 129

22 
Wishaw
Rebalancing
RepopulatingRepositioning
Repurposing
Airdrie
A High Street for Everyone
A People Centred Approach
Our high streets offer a rich and authentic environment
that for generations has been the backdrop to the
ceremonies and memorable events of our community.
Furthermore, the health of our town centre reflect
the health of our wider community or society. An
energised town centre that is open to all and where
there is opportunity for improvement, will help
enrich the lives of our residents. It is critical that we
achieve a perception shift in our communities and
stakeholders and reposition the High Street at the
heart of the community. In doing so we are seeking to
develop a better town centre where the requirements
of all, regardless of age, ability or wealth, are
accommodated.
The following section outlines the key issues and
opportunities which have helped drive forward the
development of the Town Action Plan for Airdrie. These
key drivers have been identified from:
• the findings which were outlined in The Town
Centre Visions and Town & Community Hub plans
which were approved by Council in 2021 (as part
of the Council’s ‘The Place: The Vision’ strategy)
following an extensive programme of public
consultation;
• desktop research to assess the key challenges,
issues and opportunities which need to be
addressed or taken forward to help support the
transformational change of Airdrie Town Centre;
• and the workshops and consultation work
(including community board briefings, on-line plans
and questionnaire and a 6-week exhibition held
within Wishaw library which also incorporated
opportunity for one-to-one drop-in sessions) that
has allowed local communities to comment on
plans and bring forward proposals for change.
The general feedback from this consultation was as
follows:
• it was recognised that given current retail trends,
alternative options need to be developed for our
town centres;
• general support was given for the Council’s goals
to promote and enable town centre living;
• the importance of the heritage fabric of our towns
was highlighted and a demand to, where possible,
repurpose and reuse historic buildings rather than
replace these; and
• good transport and access links to our town
centres was seen as vital to success of our towns.
It should be noted that as part of the consultation
process, there was limited input received from retailers,
the business community in general. It is, however,
intended that the Council will undertake further
consultation on the Town Action Plans with local
communities and stakeholders (including targeting local
businesses) as part of future reviews and updates of
these plans.
14
Town Action Plan Wishaw
Page 129 of 312

Page 130

A Vision for our
Towns
Some of our town centres face difficulties.
Built around a twentieth century model of
primary retail, they have been challenged by
the rise of online and out-of-town shopping. 
A key strategy among larger retailers and
banks is to reduce their high street presence.
How do towns survive as retail gradually
moves away and how can the council
reimagine our towns?
The answer is to reposition town centres as mixed-use spaces. Only by shifting the
focus from retail-driven town centres to a broader mix of investment, and promoting
town centre living, can our towns have a sustainable future.
The council can bring about this change by positioning local services in towns and
communities. By doing so, local people can have more direct access to services they
need and staff can be closer to the communities they work in.
This is about more than niche retail, developing the evening economy or increasing
leisure opportunities. These must be living towns, with a much stronger focus on new-
build housing, residential conversion and refurbishment that will address the decline of
the built environment.
15
Page 130 of 312

Page 131

Crucially, the Town Visions join together with Town and Community Hubs and
our Country Parks for the Future programmes to create a coherent, vibrant and
sustainable future for North Lanarkshire.
The Town Visions which follow are concepts, highlighting proposals for each town
and how each town could function in the future. These recognise that one size
does not fit all. Each of the towns in North Lanarkshire has its own challenges and
opportunities and its own history and heritage.
A number of common themes have emerged in the development of these
prospectuses. For example, there is a need for residential development which uses
land no longer required for traditional retailing. Improving town centre access and
active travel, and examining the needs of an older population living longer, are key
considerations.
The council can’t do this alone.
The Town Visions contained here are just that:
visions.
To become a reality, these visions need to be
shaped through extensive consultation and
engagement with community planning partners,
landowners, retailers, residents, councillors and
other agencies. These visions should inform both
public and private sector investment.
The Town Visions represent a long-term strategy for transformation over a 
15-20 year period. They work alongside town centre projects already planned
for the short and medium term including regeneration projects, the acquisition of
prominent vacant and derelict buildings and sites, new council house construction,
and infrastructure and access developments.
16
Town Action Plan Wishaw
Page 131 of 312

Page 132

The Vision
for Wishaw
17
Page 132 of 312

Page 133

The Vision for Wishaw
Wishaw is an enterprising well-connected town and
it is around these core values that the town’s future
is based. The vision seeks to build on this quality of
place creating a new compact and livable centre that
connects the Cross, the Houldsworth Centre, the rail
station, the proposed Town Hub, green areas and
pedestrian routes.
The vision is built around ‘town livability’ strengthening
Wishaw’s place quality and supporting community
wealth and civic value within an enterprising and
inclusive economy. New town centre living will be
provided for within a mix of affordable, amenity and
open market energy efficient homes which will support
growth and sustain a vibrant town centre.
Wishaw is a great place to live and work offering both
enterprise opportunities for home office and home
working units alongside a strong small business base.
Research has shown that the small independent
retail sector is more resilient to change during times
of economic stress and it is these local businesses
that the Council is seeking to secure moving forward.
Equally the centre is well connected with good public
transport links to Glasgow and other centres and can
be a quality commuter town offering accessible living
with good connections to employment in the city
region and beyond.
The proposed Town Hub together with the
Houldsworth Centre alongside easy access to regional
health, sports and educational facilities (Wishaw
General Hospital, Ravenscraig Regional Sports Centre,
New College Lanarkshire) make Wishaw and enviable
destination. Development of walking and cycling routes
and ‘greenways’ will further connect regional facilties
and adjacent centres creating an attractive green
circular network through the Clyde and Calder valleys.
Wishaw’s compactness, its connections, street pattern
and greenspace make for a town that can build
resilience and adaption to climate change, strengthen
community life, support health and wellbeing and low-
carbon living. Sustainable and SMART urban systems
(Waste/Drainage/5G-Wifi/Transport) will with other
facilities make Wishaw a place of choice.
Wishaw Opportunities
Town centres are facing a range of opportunities and
challenges as community needs and the way we use
our centres change. Wishaw needs to adapt and
strengthen its role as an appealing and liveable centre
based on quality of place, enterprise, community
assets, heritage and low carbon living.
The core projects involve:
• Developing a new Town Hub for the delivery of
public services including education and leisure
uses
• Focusing investment in the town centre around
the Cross, Kirk Road and connections to the rail
station.
• The creation of new active routes to link the town
centre to major community assets such as the
Town Hub, Wishaw General Hospital, Ravenscraig
etc.
• Promoting a sense of place by securing long term
futures for heritage assets.
• Promoting lifestyle appeal based on town centre
living adjacent to services and places of interest.
55 
18
Town Action Plan Wishaw
Page 133 of 312

Page 134

Town & Community Hubs
As part of the Council’s ambition for North Lanarkshire,
all schools constructed pre-1996 have been identified
for improvement or replacement. So that they can
be sustainable, we need to reduce the number of
building assets across North Lanarkshire, working with
communities and partners. As such, our town and
community hubs will in some places, be merged,  
co-located or combined and integrated with other
community and partnership assets. For example, there
may be a single campus for 2-18 year olds where early
learning, primary and secondary education is delivered
alongside other council and community services.
To design this model, we will use six guiding principles:
• Inclusive, universal provision: a hub must serve
the whole community and offer universal provision of
services as a default.
• Sense of community ownership: central to the
model is learning and teaching, but the hub must be
an asset for the whole community.
• Maximum availability and usage: hubs will operate
from early in the morning until late in the evening.
They must be multi-functional and must be able to be
used throughout the day.
• Designed with the community: options for design
should be shared as early as possible in the process
so that people in communities have ownership.
• Tailored, bespoke, representative: each hub will be
unique to ensure it meets specific community needs.
• Maximise services on offer: services available
within the hub should complement rather than
compete with services already serving the same
community.
TOWN
HUBS
COMMUNITY
HUBS
SMALL
COMMUNITY
HUBS
EARLY YEARS
FACILITIES
(council or
partnership
run)
PRIMARY
PROVISION
SECONDARY
PROVISION
ADDITIONAL
SUPPORT NEEDS
(ASN)
PROVISION
COMMUNITY
FACILITIES
PLAY
OLDER
ADULTS CAFÉ
GREENSPACE
RETAIL/
COMMERCIAL/
START-UP
OFFICES
FAMILY COUNCIL AND
PARTNER
STAFF
LEISURE HEALTH
SERVICES
EMPLOYABILITY
/ TRAINING LIBRARY
SPORT
(INDOOR AND/
OR OUTDOOR)
TRANSPORT
Hubs will have a form and facilities based on the need of the local community.
Zones which could be included are numerous and could be some or all of the following:
We envisage three types of hub:
Town hubs are likely to include primary and secondary education and an early years
facility. Other services on offer in town hubs will be larger in scale, such as more
comprehensive sport and leisure offerings, more significant outdoor sport provision and a
wider range of services.
Community hubs are likely to include at least one learning establishment and may
include other zones such as sport and leisure.
Small community hubs may exist in areas where there is no requirement for new
education facilities but where there is a need to replace older facilities such as libraries,
community centres or health facilities.
19
Page 134 of 312

Page 135

Wishaw Town Hub
The Council has identified the land in and around
Wishaw Sports Centre and Beltane Park off Alexander
Street as the preferred site (following a public vote) for
the development of the Town Hub for Wishaw. This
site was presented as one of two location options,
as it is owned by the Council, has sufficient land to
accommodate the footprint of the Town Hub campus
and is centrally located within Wishaw in close
proximity to the Town Centre, the mainline Rail Station
and Wishaw & district General Hospital.
The Council is currently seeking to secure the funding
to proceed with the design development of the Town
Hub and associated statutory public consultation. The
hub would provide new state of the art facilities for
St Aiden’s HS, St Thomas PS plus ASN and an early
years nursery.
Community Hubs
The Newmains and St Brigid’s Community Hub was
opened in January 2023. The hub accommodates
Newmains PS, St Brigid’s PS and the Newmains
Family Learning Centre. This facility has been designed
to be open and accessible to the whole community,
with predominately school access during the day and
the wider community able to access many areas within
the hub outwith school hours.
The building design is seen as an exemplar for the
development of future Community Hubs in terms of its
energy efficiency, accessibility, quality of internal and
external learning environments and play facilities.
The Council will continue to review the physical
condition of its education estate to ensure they
continue to meet the needs of the wider community.
11  20
Town Action Plan Wishaw
Page 135 of 312

Page 136

Retail
While the ambition for all of our town centres is to
move towards a more mixed use offering to improve
resilience and recognize the shift in how we use our
town centres the Council wants to retain and support
the retail sector and assist it’s recovery from the double
impacts of an economic downturn and the Covid
Pandemic.
Research has shown that the independent retail sector
is more resilient to change than larger national multiples
and that these, in most cases, local businesses, will
prevail if sufficient infrastructure and interest is in place.
We will therefore seek to support the retail sector
by encouraging existing landlords to refurbish larger
vacant units into smaller units to provide space for
entrepreneurs and established businesses to find the
optimum premises for their business.
There are fiscal and legal reasons why the Council
cant get involved in direct subsidies to the private
sector, however, we are working with partners to
identify potential funding streams to promote business
investment and regeneration of the high street.
Where vacancy occurs we will encourage businesses
to concentrate around key nodes with less accessible
premises being promoted for conversion to residential
use in an effort to sustain existing footfall within the
town centre.
Commercial
The collapse in the demand for commercial premises
such as offices in town centre locations echoes wider
structural changes in the economy and the growth of
digital connectivity. The impacts of the Covid pandemic
demonstrated the benefits and ease of remote working
across the public and private sector and led to an
exponential growth in homeworking with a resulting
impact on footfall within the town centre.
Moving forward commercial space needs to be
accessible and energy efficient to compete with out of
town locations. Given that existing commercial uses
are at first floor level their conversion into residential
use should be easier that the refurbishment of ground
floor premises.
Leisure& Hospitality
The leisure and hospitality sector is a key component
of the move towards a more mixed use town centre.
The importance of Place in terms of the public
perception of character and safety is very important
in attracting people to use existing businesses. Ease
of movement to and from these uses will encourage
people to access the town centre for leisure activities
to sustain and develop the nightime economy and
footfall. The Council’s role will be to promote active
travel routes, investment in public transport and the
cleanliness and safety of the public realm.
Economic Prosperity & Stability
21
Page 136 of 312

Page 137

88 
Image: Proposed residential flatted development on Main Street (former Anvil Block)
22
Town Action Plan Wishaw
Page 137 of 312

Page 138

New Build
Admittedly, developers looking to offer housing
options within town centres find that they are typically
more expensive, riskier, and take longer than other
housebuilding options. Town centre projects also
tend to be smaller, providing less financial return.
However, the Council is of the view that the overall
gains outweigh risks and costs if we take into account
the wider societal benefits such as improved wellbeing
and a reduction in carbon footprint. Key to helping
to deliver this is identifying how the Council de-risks
and enables such development through, for example,
providing development support (e.g. via the Council’s
Invest in North Lanarkshire’s Programme of Work) or
promoting development opportunity through agreeing
up front to buy ‘off-the-shelf’ housing being proposed
by the private sector in order to guarantee sales.
This type of model has been used to promote private
sector housing investment has been employed
elsewhere across North Lanarkshire and has proved
successful. As such, it is very much viewed as a
potential model which could be used to support the
delivery of town centre living across the local authority
area and its towns.
There are a number of new housing developments
currently being taken forward by the Council in Wishaw
Town Centre (including, for example, the former
Kingshouse office site on the corner of Graham Street
and Campbell Street and the former Methodist Church
site on Caledonian Road). However, there are also likely
to be opportunity for private sector development with,
for example, plans for LIDL to relocate to Heathery
Town Centre Living
Road in Wishaw and their existing site expected to be
brought to the market for residential development.
The Council hopes that by taking the lead in the
delivery of town centre living, we can make the case
that there is a latent demand for good quality town
centre houses and encourage the private sector to
invest. Private sector investment and development is
important to ensure both tenure and design diversity
so that we can, over time, improve the townscape and
character of the town centre.
23
Page 138 of 312

Page 139

Refurbishment
The Council is actively seeking to replace redundant
and in some cases derelict properties within the town
centre to residential development to ensure that we
respond to issues of vacancy and dereliction. However,
it also recognises that in many cases the refurbishment
of existing buildings within the town, rather than
demolition and replacement, can not only reduce
the carbon footprint of development but also retain
the character of the townscape and help preserve a
centre’s unique sense of place.
Since the launch of the Town Visions, the Council has
entered into conversation with private and third sector
property owners within Wishaw, who are potentially
looking to refurbish key buildings within the town
centre, in order to identify how we can lend support
for their plans. Although none of these proposals are
as yet at an advanced stage, the Council remains very
much committed to, where possible, safeguarding and
refurbishing buildings within the town centre (either
directly if under Council ownership or by working with
property owners when not) where these add value to
the quality of this environment.
Heritage Refurbishment
The communities’ perception of ‘Place’ is informed
by the quality of the public realm and key heritage
buildings. Wishaw Town Centre has a number of
heritage properties which are functionally obsolete
but of good quality and whose external appearance
contributes to the character and history of the town.
Heritage buildings on the Main Street include, for
example, the YMCA and the Church of Scotland.
Such buildings make a significant contribution to
the townscape and it could be argued that the Main
Street would be poorer if they are not improved and/or
repurposed as they could fall into disrepair eventually
resulting in demolition.
We would encourage the owners of listed buildings
who are considering the future of their building(s) to
approach the Council to discuss ways in which the
properties can contribute to the vision of a mixed-
use town centre. The Council has recent experience
of working with organisations such as Historic
Environment Scotland, external funders such as the
National Heritage Lottery Fund and delivery partners
(including Registered Social Landlords) to help take
forward the regeneration of such properties.
Tower Reprovisioning
North Lanarkshire’s Towers Reprovisioning Programme
is seeking to demolish all high-rise towers and selected
low-rise block properties across North Lanarkshire
and replace them with quality flatted, terraced and
semi-detached housing to meet the needs of the local
community.
In the first phase of these works, the replacement of
the low-rise properties at Gowkthrapple and Allershaw
are in progress and at design stage respectively whilst
the second phase of works (to be delivered over the
next 3-5 years) will include the replacement of low-
rise blocks at Greenfield Drive (4 blocks), Glasgow
Road (3 blocks) and the Anvil Block on Main Street.
Whilst the footprint of these low-rise blocks will provide
housing for some former tenants, the reprovisioning
of existing properties and construction of new
residential development within the town centre offers
an opportunity to rehouse these tenants, helping to
repopulate the centre and bring them closer to key
facilities and services which our communities require.
24
Town Action Plan Wishaw
Page 139 of 312

Page 140

88  88  Images: The top two images are exemplars of modern residential flatted development, the bottom two images are sketch proposals for the replacement for the
Anvill Block on Main Street.
25
Page 140 of 312

Page 141

Movement & Active Travel
26
Town Action Plan Wishaw
Page 141 of 312

Page 142

Movement & Active Travel
Public Transport
Town centres are hubs for transport interchanges with
Wishaw having strong rail network and bus service
links. Developing the points of interchange, making
public transport more accessible, appealing and
environmentally responsive are key considerations
within the Wishaw Town Action Plan.
Wishaw Train Station, located on the Lanark to
Glasgow mainline, offers excellent transport links. To
help to try to take advantage of this, the Council will
enter into discussions with Scotrail and Strathclyde
Passenger Transport to consider the options for the
development of an improved transport interchange
around the rail station, supporting improved active
travel routes, enhancing transitions between rail and
bus and improving the quality of the environment
around existing park and ride facilities to promote a
switch from private car travel to public transport as part
of our commitment to a low carbon future.
Securing net zero and developing a carbon neutral
economy will require the need to travel to be reduced.
Radical solutions are required based on reduced
car travel, the development of stronger active travel
infrastructure and piloting new initiatives around
20-minute neighbourhoods.
Active Travel
Active travel (walking and cycling including e-bikes)
Active travel (walking, wheeling and cycling) has many
environmental benefits, as well as improved health
and wellbeing, and is a core part of rebalancing the
transport modes within our town centres.
The town centre as a focus for active travel activity
needs to be driven by connecting the town to facilities
and services as well as the surrounding area. As
such, developing active travel routes between Wishaw
and nearby towns and communities as well as other
key facilities and locations, such as the proposed
Town Hub, the Houldsworth Centre, Wishaw General
Hospital, local schools and local greenspace (e.g.
Belhaven Park and Greenhead Moss Community
Nature Park) are seen as a central priority of the Action
Plan.
Prioritising Sustainable Transport
Walking and wheeling
Cycling
Public Transport
Taxis & Shared transport
Private Car
27
Page 142 of 312

Page 143

44 
Built Heritage & Place
Images from top left: Wishaw Main Street looking
south west, The former Greens Cinema/Mecca
Bingo Hall, The Houldsworth Centre, The Century
Bar and the Waverly Bar.
28
Town Action Plan Wishaw
Page 143 of 312

Page 144

Built Heritage & Place
Built Heritage
North Lanarkshire’s towns have character. Distinctive in
form and heritage, the town centres are a reminder of
a positive and defining economic past (coal, iron, steel,
mills, quarrying) with many notable buildings.
Wishaw like many towns has suffered from the loss
of key buildings and there is a need to consolidate
remaining historic buildings in the town centre and
sustain its heritage infrastructure.
The vision for Wishaw seeks to build on the distinctive
character and quality of place using this legacy to
reinforce urban form and repurpose heritage buildings
with new uses, creating new civic facilities, residential
homes and mixed-use premises.
Within Wishaw, the council has supported Registered
Social Landlords (RSLs) to address the ‘cost-gap’
associated with new build town centre housing sites
(e.g. by providing Vacant and Derelict Land Fund
monies for land remediation works at the former Tesco
site on Main Street) to help create a viable development
– this is very much seen as a possible route for
enabling the development of new build housing within
Wishaw Town Centre. However, this approach has
also been used to help regenerate and repurpose
buildings in other town centres which contribute to the
architectural and heritage value of these towns. This
includes, for example, the former Carnagie Library
in Coatbridge (where the council was able to secure
heritage lottery funding to support the award-winning
conversion of this building for housing) and Bromknol
Church in Airdrie (where the council allocated capital
to enable the successful redevelopment of this historic
building). To replicate such activity in Wishaw, the
Council will identify potential vacant or underused
heritage properties in the town centre and work with
owners and key partners to identify and help secure
funding for the repurposing of such buildings for
housing, community or other viable uses.
Place
When we speak of place we are talking about the
character and quality of the townscape which is a
key asset of our towns and comprises all publicly
accessible space (streets, squares and greenspace) for
people to come together and engage as a community.
We are seeking to promote a more inclusive place
promoting longer dwell time and increased town centre
footfall. Public use of town centres and increased
activity supports civic presence and improved security.
Actively used, thriving public space is both safer, and
more welcoming than unused space.
In helping to improve space within our town centres,
and in direct response to the requirement’s of
Scotland’s National Planning Framework 4, the Council
is currently preparing an Open Spaces Strategy for
North Lanarkshire.
This strategy will assess existing open space and
green networks and help guide how we manage and
meet the need for openspace in town centres such as
Wishaw in the future. As such, future reviews of the
Action Plan will give cognisance to the findings of this
emerging strategy and help guide how we shape our
openspace going forward.
However, the Vision for Wishaw Town Centre already
identifies a need for improved ‘gateways’ to the main
street, improving the aesthetical quality of streetscape
and creating ‘place quality’. In doing so, work has
already started on securing ownership and permissions
needed to address eyesores on entry to Wishaw at
Glasgow Road and at the former Stag Hotel site on
Main Street. In line with the Vision, new improved
entry points to the town also need to be developed on
Caledonian Road, Kennilworth Road and Stewarton
Street.
Lastly, vacant and derelict buildings within the town
centre continue to have a detrimental impact on
the quality of place and action needs to be taken to
reverse this (including, for example, the acquisition and
repurposing of buildings such as the former derelict
Sherlock’s public house).
29
Page 144 of 312

Page 145

66 
30
Town Action Plan Wishaw
Page 145 of 312

Page 146

Carbon Reduction
Town Centres have a key role in supporting a
sustainable future and contributing to the essential
adaptation necessary to address climate change
and our commitment to net zero. Place shaping can
help contribute to climate change targets through
the repurposing of buildings; developing 20-minute
neighbourhoods, reducing the need to travel and
supporting flood mitigation.
Key measures within the vision for supporting carbon
reduction in Airdrie will include:
• property upgrading, retrofit and re-purposing (making
these more energy efficient);
• developing active travel infrastructure;
• greening activity;
• extending EV Charging infrastructure; and
• planning for compact urban centres and accessible
services.
The carbon cost of demolishing existing buildings and
then developing new buildings is also in most cases
higher than the carbon cost of refurbishment and
adaption of buildings to new uses.
To date, the projects which the Council are taking
place in Wishaw have focused on the demolition of
building and replacement of new build due primarily
to the quality of building and/or suitability of design of
properties for conversion to alternative use.
However, where possible, the council will advocate and
take forward the adaption and reuse of buildings within
Transition to Net Zero
the town centre, rather than replacement, making them
more energy efficient and extending their viable use.
This both reduces our collective carbon footprint and
retains the heritage and character of the town.
Green Blue Infrastructure
Planning needs to support local measures to minimise
the impact of intense rainfall events and to mitigate
flood risk while also designing-in flood resilient places.
Area wide measures may include, for example, green
corridors for storm water flows linked to new habitat
management measures and our active travel networks.
EV Charging Infrastructure
The Scottish Government’s requirement to phase out
the need for petrol and diesel vehicles by 2030 will
impact on our centres with charging and fast charging
points becoming part of the urban fabric.
From 5 June 2023, the regulations also requires
electric vehicle charging to be installed for new
buildings and those subject to major renovation. This
includes one EV charge point socket to be provided for
all new housing and flats and in 10% of parking spaces
for non-domestic buildings where these have 10 car
parking spaces or more.
Added to this, in order to encourage and enable the
use of our towns, the council needs to take forward
the installation of EV charging points within our town
centres for general public use. At the moment work
is ongoing through the Glasgow City Region team on
behalf of all local authorities with a view to engaging a
provider to install and operate our EV charging going
forward. As part of this, the intention would be for
the provider to agree proposed sites with the council,
located at key points that will meet future demand and
need of town centre users.
The Council will adopt the guidance set out in the
revised Building Regulations regarding EV charging
points within new developments. The Council will also
investigate the roll out of EV charging within public car
parks and public facilities.
Moreover, the Council has also recently purchased
the area of derelict land on the corner of Steel Street
and Caledonian Road and will use this to extend the
existing town centre car park and create a potential EV
Charging hub at this site.
31
Page 146 of 312

Page 147

Other Considerations
Finance & External Funding
It has been well publicised that over the next three
years, North Lanarkshire Council (along with other
public services across Scotland) face significant budget
cuts. As such, investment made through the Town
Action Plan has to ensure that ongoing future revenue
or operational costs associated with any works is
minimal and, where possible, additional revenue
generated through, for example, increased rents or
business rates.
Moreover, to reduce the burden on the Council’s
available capital, the Council will look to fund such
works by alternative means through: promoting
and seeking private sector investment; use of North
Lanarkshire’s Housing Revenue Account; and sourcing
funding through Scottish Government Programmes
(such as the Place Based Investment Programme and
Regeneration Capital Grant Fund Programme), the
UK Government (with funding recently received for
Cumbernauld and Coatbridge Town Centres through
their Levelling Up Fund and Town Fund programmes
respectively) or other funders (such as the National
Heritage Lotter Fund).
Community Wealth Building
The Town Action Plan for Wishaw has been developed
in consultation with local communities to help identify
the key actions which we want to take forward to
help improve and regenerate Wishaw Town Centre.
However, in order to drive and sustain real change,
it is critical that local communities buy in to and take
ownership of these plans.
Community Wealth Building is designed to harness
the economic leverage of local ‘anchor’ organisations
to tackle long-term systematic challenges within local
communities and help to change the way we manage
and provide local services through, for example,
community-owned assets, a focus on local supply
chains and local job creation – key goals which need to
be embedded as part of the delivery of the Action Plan.
Communications Plan
It has been identified that the Action Plan affects four
key stakeholder groups:
• local communities and residents living in the town
centre (with the viability of the centre dependent
upon being able to attract local people to use the
town and sustain local spend);
• local businesses and shops (with retailers
particularly interested in opportunities which may
be brought forward through the plan, how change
will affect their business and how works may
disturb trade);
• potential visitors to Wishaw and people who live
outwith Wishaw but work within the town centre
(both of whom will contribute to spend and the
local economy); and
• the council and other public bodies (who will lead
on and contribute to the delivery of the plan).
Raising awareness of our plans for Wishaw is essential
to keeping these stakeholders engaged in the process
of transforming the town centre and securing their
buy in to the works being proposed. To ensure these
groups are fully informed, a detailed Communications
Plan will be developed for Wishaw Town Centre to
make sure proposals are shared and stakeholders kept
updated on progress made.
As part of this Communications Plan, the Council aim
to host a bespoke ‘Town’s Page’ for each of the main
towns across North Lanarkshire on its website. This
will incorporate news and information for each town
including copies of the Town Visions and Action Plans
and progress being made on the delivery of Action Plan
proposals.
32
Town Action Plan Wishaw
Page 147 of 312

Page 148

Section 3:
Wishaw Town Action Plan
Page 148 of 312

Page 149

Town Action Plan Proposals
Project Proposal Timescales*
Economic Prosperity & Stability
Sherlocks Pursue the acquisition, demolition and redevelopment of the former
Sherlock’s Public House on Caledonian Road including a new
commercial floor plate next to the Cross to offer opportunity for
business relocation to the core retail area of the town centre
Short-term
Town Centre Audit
& Demand Analysis
- Vacant Office
Space
Undertake an Audit and Demand Analysis for vacant office space
within Wishaw Town Centre to help develop a strategy for the
repurposing of this space
Short-term
Town Centre Living
Sherlocks The potential acquisition, demolition and redevelopment of the former
Sherlock’s Public House on Caledonian Road including new residential
accommodation above a new commercial floor plate
Medium-term
The Anvil Block
(Main Street)
The demolition of the Anvil Block and replacement with new flatted
development as part of NLC’s reprovisioning programme
Medium-term
Caledonian Road
(Former Methodist
Church & Thornlie
Parish Church Hall
sites)
The development of 15 residential units to be taken forward by NLC Short-term
Former Kingshouse
Offices
The development of 20 residential units to be taken forward by NLC Short-term
King Street The development of 5 residential units to be taken forward by NLC Short-term
Caledonian Road/
Lomond Drive
(V&DL Site)
The development of 21 residential units to be taken forward by Link
Housing Assoc.
Short-term
Buy-Backs Continuation of the Council’s ‘buy-back’ scheme to offer affordable
housing within Wishaw Town Centre
Ongoing
Project Proposal Timescales*
Movement & Active Travel
Active Travel The development of a design and costing study, aligned to North
Lanarkshire’s Active Travel Strategy, to map out potential Active Travel
Networks across Wishaw Town Centre. This will focus on access to
key facilities and locations including the proposed Town Hub, Wishaw
Train Station, the Houldsworth Centre, Wishaw General Hospital,
Ravenscraig and New College Lanarkshire
Short-trem
Wishaw Transport
Interchange
Initial engagement with Scotrail and Strathclyde Passenger Transport
to consider as part of the Local Transport Strategy options for the
development of an improved transport interchange around the rail
station to improve transitions between rail and bus and increase car
parking capacity
Short-term
Built heritage & Place
Heritage Buildings Identify key heritage buildings within town centre that are vacant,
underused or in poor condition and enter/continue discussion with
owners to identify roue for safeguarding, improving or repurposing
properties. This will include helping to source funding for these
regeneration initiatives.
Medium-Term
Glasgow Road &
Former Stag Hotel
Sites
Explore the potential to acquire the former Stag Hotel site and take
forward the regeneration of these key Town Centre Gateways through
the development of new green/civic space
Short-term
Caledonian Road,
Kennilworth Road
& Stewarton Street
Undertake feasibility works to assess viability and costs for the
development of new town gateways
Short-term
Transition to Net Zero
EV Charging Site Investigations of NLC’s carparks across Wishaw Town Centre to
assess suitability/infrastructure needs for EV Charging Installation
as part of the delivery proposals currently being developed through
Glasgow City Region
Long-term
Caledonain Road
Car Park
Explore the potential to extend the Car Park within V&DL site off Steel
Street to include additional parking and EV Charging Hub
Town & Community Hubs
Wishaw Town Hub The development of Wishw Town Hub (with the preferred location
identified at Wishaw Sports Centre/Beltane Park)
Long-term
*Short-term: 1-3 Years  /  *Medium-term: 3-7 years  /  *Long-term: 7+ years
34
Town Action Plan Wishaw
Page 149 of 312

Page 150

The Action Plan Proposals Map
G G
G
G
TH
PTT
PT
Core Retail Area
Area of Change
G
Potential New Public Sector Housing
Potential New Private Sector Housing
Recent Housing Developments
Potential Active Travel Route
Enhanced Public Transport Hub
Heritage assets
New Gateway Feature
(Town Centre Boundary)
Potential Electric Vehicle Charging
Infrastructure (Public Car Parks)
35
Page 150 of 312

Page 151

3D Proposals Map
MAP TO FOLLOW
36
Town Action Plan Wishaw
Page 151 of 312

Page 152

Strategic Alignment
The Town Action Plan for Wishaw is aligned with 
The Plan for North Lanarkshire and other key
strategies, policies and plans.
ACTIVITIES
ECONOMIC
REGENERATION
DELIVERY PLAN
ENVIRONMENTAL STRATEGY
LOCAL DEVELOPMENT PLAN
LOCAL HOUSING STRATEGY
DIGITAL AND IT STRATEGY
TACKLING POVERTY STRATEGY
ACTIVE TRAVEL STRATEGY
THE
PLAN FOR
NORTH LANARKSHIRE
SHARED
AMBITION
Together this strategic policy framework ensures
that work is aligned with our priorities and enables
the required resources and working practices
needed to facilitate delivery of the shared
ambition.
Wishaw Town Action Plan will be reviewed on an
annual basis, not only to ensure that it remains
aligned to any new or emerging strategies
developed by the Council and its partners, but
also to make sure that any new opportunities can
be incorporated within the plan proposals and
any new issues arising within the town centre
addressed.
37
Page 152 of 312

Page 153

Notes
38
Town Action Plan Wishaw
Page 153 of 312

Page 154

Notes
39
Page 154 of 312

Page 155

This document can be made available in a range of
languages and formats, including large print, braille,
audio, electronic and accessible formats.
To make a request, please contact Corporate Communications
at: corporatecommunications@northlan.gov.uk
’S urrainn dhuinn an sgrìobhaidh seo a chur ann an diofar chànanan agus chruthan,
a’ gabhail a-steach clò mòr, braille, cruth claisneachd agus cruthan dealanach agus
ruigsinneach.
Gus iarrtas a dhèanamh, cuir fios gu Conaltradh Corporra aig: 
corporatecommunications@northlan.gov.uk
Niniejszy dokument można otrzymać w wielu różnych językach i formatach, w tym
również dużym drukiem, alfabetem Braille’a, w wersji dźwiękowej, elektronicznej i w
innych dostępnych formatach.
Prośby należy składać na ręce zespołu ds. komunikacji drogą elektroniczną na adres: 
corporatecommunications@northlan.gov.uk
此文件可以多种不同语言和格式提供,包括大字体、点字、音频、电子和易读格式。
如想提出请求,请联系企业传讯部:corporatecommunications@northlan.gov.uk
corporatecommunications@northlan.gov.uk
CC_2023_00011
Produced by
NORTH LANARKSHIRE COUNCIL
Growth Team
Place
Civic Centre
Motherwell
Ml1 4AB
e. growthteam@northlan.gov.uk
NORTHLANARKSHIRE.GOV.UKPage 155 of 312

Page 156

Page 156 of 312

Page 157

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    FT/YW/AR Date 17/11/23 
Renewal of Fair Trade Zone/Community Status for North
Lanarkshire 
From  Pamela Humphries, Chief Officer (Place)          
E-mail weiry@northlan.gov.uk Telephone  07508 001238 
1. Background
1.1 On 4 April 2019, North Lanarkshire Council agreed a Motion to develop and support a
strategy to facilitate the promotion of foods with a Fairtrade Mark, actively supporting
marginalised producers achieve a fair price for their products and aim to be recognised
by the residents and business community of North Lanarkshire, suppliers, employees
and other Local Authorities, as a Council that actively supports and promotes Fairtrade.   
Executive Summary 
The purpose of this report is to inform the committee of the activities of the North
Lanarkshire Fair Trade Zone and associated Steering Group since its approval in February
2020, and the intention to apply to renew the Fair Trade Zone status for North Lanarkshire
before 1st January 2024.               
Recommendations
It is recommended that the Enterprise and Fair Work Committee: 
1) Acknowledge the activities of the North Lanarkshire Fair Trade Zone Steering Group
and enable the work to continue through supporting the proposal to apply to renew the
Fair Trade Zone status for North Lanarkshire with the Fairtrade Foundation; and 
2) Endorse the continued provision of Fairtrade coffee, tea and other products within
Council cafes, leisure and community facilities, and at Council hosted events. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (5) Grow and improve the sustainability and diversity of North
Lanarkshire's economy 
Programme of Work  Sustainable Futures 
Item 4
Page 157 of 312

Page 158

1.2 North Lanarkshire Council has contributed to achieving Fairtrade status for North
Lanarkshire by promoting the Fairtrade Mark using Fairtrade products in refreshment
areas and by promoting the Fairtrade Towns initiative in internal and external
communications.  This includes the engagement in Fairtrade Fortnight, the national
campaign held to promote the sales of products with the Fairtrade Mark. 
1.3 North Lanarkshire Council pledged to support the International Fair Trade Charter in
October 2019. The Charter‘s role is to address challenges including inequality, gender
rights, climate change and many of the topics of the UN Sustainable Development
Goals. The Charter was initiated by the two largest international Fair Trade
organisations – Fair Trade International and the World Fair Trade Organisation and
was also supported by the Scottish Fair Trade Forum. The Fair Trade movement was
established to ensure producers are paid a fair price and offered opportunities to
participate in global markets without exploitation.  The Charter has three main aims: 
• to raise awareness among consumers and citizens of the importance and impact
of Fair Trade;
• to connect Fair Trade Organisations’ specific missions and strategies with the
common philosophy of the movement; and 
• to enable others who work with Fair Trade Organisations to recognise the values
and approaches that unite the global movement 
The Charter details the positive impact that Fair Trade has on the lives of farmers, other
workers and artisans and illustrates how inclusive economic growth and improved
working conditions can be achieved, whilst empowering women and ensuring
opportunities for the next generation. Through signing the Charter, the council was
asked to recognise the Charter as a reference document for the global Fair Trade
movement and to reflect approaches within the charter when engaging in Fair Trade
issues. The Charter does not endow the council with any Fair Trade status. 
1.4 North Lanarkshire Council is also a member of the Scottish Fairtrade Forum which is
an independent membership body that was established by a group of Fair Trade
campaigners, Scotland-based non-governmental organisations and the Scottish
Government. The Forum promotes the cause of Fair Trade in Scotland and helped
secure Fair Trade Nation status for Scotland in 2013. 
1.5 In order for North Lanarkshire to achieve Fair Trade Zone status in 2020, 5 goals
required to be achieved: 
• Council Resolution: The Council had to pass a resolution supporting Fairtrade
and agreeing for example, to serve Fairtrade tea and coffee at its meetings and in
its offices and cafes. 
• Fairtrade Products Available Locally: A range of at least 4 Fairtrade products
needed to be readily available in a minimum of 26 of North Lanarkshire’s retail
outlets (shops, supermarkets, newsagents, petrol stations) and served in at least
13 local catering outlets (cafes, restaurants, pubs). A baseline audit was
undertaken to demonstrate this requirement had been met. 
• Fairtrade in local work places and organisations: This included workplaces,
community organisations (churches, schools) of significance to the zone if possible. 
This also needed to include a flagship employer, who was large, local and influential
workplace that uses Fairtrade products and promotes Fairtrade to its staff, clients
and contacts. Brakes Ltd as a key council supplier and local business agreed to
become the local flagship employer. 
Page 158 of 312

Page 159

• Establishment of a Steering Committee: This was essential to ensuring
continued commitment to Fairtrade Status. The North Lanarkshire Steering Group
was established with its inaugural meeting on 30 October 2018. The group includes
4 elected members, council officers from a range of services supported by the
Enterprise Team, local Fair Trade campaigners, staff from the Scottish Fair Trade
Forum, members of local Fair Trade groups and people from education, community
and faith groups.  The Steering Committee had responsibility for submitting the
area’s Fairtrade Zone Status application. 
• Attract media coverage and popular support:  To achieve Zone status, North
Lanarkshire needed to show that there had been a range of activities and events
throughout the Zone to promote Fair Trade and achieved press coverage for them.
This also included using social medial for the Zone to link with other groups and
amplify the Fairtrade message is a key apart of reaching and retaining Zone status. 
1.6 An application to achieve Fair Trade Zone status was submitted to the Fairtrade
Foundation on 9 January 2020. The Zone status was approved in February 2020 with
a launch event held at Brakes Ltd on 6 March 2020. 
2.   Report 
2.1 The following sections of the report highlight the wide range of Fair Trade Zone Activity
that has taken place across North Lanarkshire to support the current Zone status, and
details of the new process for the renewal of Zone status.  
North Lanarkshire Fair Trade Zone Steering Group 
2.2 Since its inception, the North Lanarkshire Fair Trade Zone Steering Group has met
regularly every 6 to 12 weeks.   The Steering Group is chaired by a local resident with
the Council actively supporting meetings and the ongoing development and activities
of the Steering Group. 
Activity of Local Fair Trade Groups 
2.3 The North Lanarkshire Zone has three towns which have gained Fair Trade Town
status through their group activities namely Motherwell, Airdrie and Wishaw. 
Representation from each group presents and updates at each meeting.  Due to the
Covid19 pandemic, activities were significantly curtailed within the communities,
preventing face to face events and interactions where Fairtrade produce would
normally be promoted and purchased.  The Council was advised on 7 June 2023 that
the Airdrie Fairtrade Group intended to dissolve their group. If North Lanarkshire Fair
Trade Zone Status is renewed, the intention would be to raise awareness of Fair Trade
in the Airdrie community and look to engage new champions to represent this area.  In
contrast, there is considerable activity ongoing in the Croy and Kilsyth area, both within
the community and schools, with an intention of working towards Fair Trade status for
these areas. 
Fair Trade Activity in North Lanarkshire Education Establishments.   
2.4 New College Lanarkshire have incorporated themes of Fair Trade and Just Transition
into their Global Citizenship studies for their special needs students.  They also run a
shop on the Motherwell campus that sells products such as gift boxes and gift bags
that include Fairtrade products or baked products incorporating Fairtrade ingredients. 
To celebrate the 10th Anniversary of Scotland a Fair Trade Nation, students at New
College Lanarkshire designed a bespoke banner depicting highlights of that decade
stitched using fabric from recycled Fairtrade cotton T-shirts. Page 159 of 312

Page 160

2.5 Schools throughout North Lanarkshire have shown engagement with Fair Trade
themes and activities peak during Fair Trade fortnight during February/March.  Schools
post their activities on social media and these are shared on Fairtrade North
Lanarkshire Twitter page @FairtradeNLan.  Schools can draw down resources from
the Scottish Fair Trade Forum and Fairtrade Foundation websites which have
resources for schools.  North Lanarkshire Council staff have also set up a bespoke
online education platform with Fairtrade resources to support teachers educating
primary school pupils.  The Wishaw Group involved primary school children from
Newmains by promoting Fairtrade in the community and learning about Fairtrade
products in shops.  In the Kilsyth area, volunteers supported secondary pupils to learn
about Fairtrade to foster global citizenship as part of the Duke of Edinburgh award
scheme. 
North Lanarkshire Council’s Support for Fair Trade   
2.6 North Lanarkshire Council coordinates the North Lanarkshire Fair Trade Zone Steering
Group meetings ensuring that papers are sent out in a timely manner and minutes
prepared are filed.  Four elected members sit within the Steering Group ensuring that
there is cross party representation. 
2.7 Awareness was raised during Fair Trade fortnight through the design and distribution
of posters across North Lanarkshire Council and NL Leisure buildings and cafés to
highlight our commitment to Fair Trade by the procurement of Fairtrade tea, coffee and
products.  Fairtrade posters were available on our website for download by any member
of our community supporting and campaigning for Fairtrade.  Following Fair Trade
fortnight posters were redesigned and are available on our website for more general
use. 
2.8 North Lanarkshire Council showed its firm commitment to Fairtrade during Fairtrade
Fortnight by flying a Fairtrade flag outside our Council Buildings in Motherwell.  The
raising of the flag by our Provost was witnessed by elected members, members of the
Fair Trade Zone Steering Group and a representative from the Scottish Fair Trade
Forum.  This act of commitment was reported across social media, local and national
press. 
2.9 The Council continues to supply Fairtrade coffee, tea and sugar plus other products in
its cafes, cultural and leisure facilities. 
2.10 Staff from the Enterprise Team regularly represent North Lanarkshire Council at local
and national events.   
Scotland A Fair Trade Nation - 10 years 
2.11 A number of activities were undertaken to mark 10 years of Scotland as a Fair Trade
Nation including members of the North Lanarkshire Fair Trade Zone Steering Group
attending a parliamentary event and a Glasgow based event on behalf of North
Lanarkshire. 
2.12 The Scottish Fair Trade Forum funded and commissioned five films to be made to
represent communities engaged in Fair Trade across Scotland.  One of the films
launched on 15 June 2023 showcased North Lanarkshire through the work of
supported learning students at New College Lanarkshire in conjunction with the
Motherwell and Wishaw Fair Trade groups. The video can be viewed at:
https://youtu.be/36q78Nc967A This highlighted at a national level the commitment of
our community to support Fairtrade. Page 160 of 312

Page 161

Renewal of Fair Trade Zone Status 
2.13 The attendance of staff from the Scottish Fair Trade Forum at the North Lanarkshire
Fair Trade Zone Steering Group has ensured that the group have been kept informed
of directives from the Fairtrade Foundation.  North Lanarkshire was due to renew its
Fair Trade Zone status in 2022, but due to the pandemic and the inability of
communities to organise in person activities across the UK, coupled with lower
engagement levels of the UK population with Fair Trade, the Fairtrade Foundation
developed new criteria for applications which were released in July 2023 (Appendix A). 
As part of the new criteria, North Lanarkshire Fair Trade Zone requires to submit an
online application by the deadline of 1st January 2024 for its status to be retained. 
2.14 Fairtrade status has been revised into several categories:  
- Fairtrade Communities (Towns, Cities, Villages, Islands, Boroughs, Counties and
Zones
- Fairtrade Places of Worship
- Fairtrade Schools
- Fairtrade Universities and Colleges 
2.15 Fairtrade campaigners are encouraged to learn about key Fairtrade issues online, take
action on campaigns, and join Fairtrade webinars. The Fairtrade Foundation has
outlined 5 Action areas which communities can engage in: 
• Action Area 1: Boosting Fairtrade. Encouraging the community to purchase and
use Fairtrade products. 
• Action Area 2: Connecting Fairtrade. Recognising the power of a collective voice,
bringing the social justice movement together, networking and partnering with other
individuals and groups in Fairtrade. 
• Action Area 3:  Fairtrade Changemakers. Growing political support for Fairtrade
locally.  Working with local council or government representatives to help create
changes needed to make trade fairer. 
• Action Area 4:  Fairtrade Ambassadors. Deepening one's own and others’
understanding of how fairer trade supports wider social change such as climate
justice and social justice.   
• Action Area 5: Fairtrade Influencers. Growing support for fairer trade in the digital
space and deepening the understanding your social media network has of how fair
trade supports wider social change. 
2.16 The support of North Lanarkshire Council to agree for the Council to continue its work
and lend its support towards the renewal of Fair Trade Zone status for North
Lanarkshire, along with the ongoing support of the Council to continue to provide
Fairtrade tea, coffee and produce for our cafes and events and show support for the
Fairtrade, will enable the Steering Group to prepare a case for the renewal deadline of
1 January 2024. 
3. Measures of success 
3.1  Formal recognition through the renewal process of North Lanarkshire as a Fair Trade
Community by the Fairtrade Foundation. 
Page 161 of 312

Page 162

3.2 Raising awareness of Fair Trade across the North Lanarkshire area, including within
the Council. 
3.3 Survival of existing Fair Trade Groups, successful renewal of Fair Trade Town status
by existing groups and new areas gaining Fair Trade status. 
3.4 Engagement of our schools and youth groups to establish an understanding of the
importance of Fair Trade in the wider context of Climate Change and Just Transition as
part of education in Global Citizenship.           
4. Supporting documentation 
4.1 Fairtrade Campaign Action Guide 2023     
Pamela Humphries
Chief Officer (Place) 
Page 162 of 312

Page 163

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Annual renewal of membership of the Scottish Fair Trade Forum is currently £250. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ Page 163 of 312

Page 164

If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 164 of 312

Page 165

FAIRTRADE
CAMPAIGN
ACTION GUIDE
Image: Fairtrade Guernsey community event, Community group Photo credit: The Drone Ranger.Page 165 of 312

Page 166

3       Welcome!
4       What is trade justice? 
6       How Fairtrade works  
8       Why we need you more than ever 
10      Becoming a Fairtrade campaigner
17      Action area 1: Boosting Fairtrade
19      Action area 2: Connecting Fairtrade
21      Action area 3: Fair trade Changemakers
23     Action area 4: Fairtrade Ambassadors
25     Action area 5: Fairtrade Influencers
27     Thank you
CONTENTS
Fairtrade Foundation   | 2 |   Campaign Action Guide
Page 166 of 312

Page 167

Thank you for finding out more about
campaigning for Fairtrade. This guide is
for anyone who is looking for a greater
understanding of what it means to be part
of the Fairtrade movement and how to
take action for trade justice. Fairtrade
campaigners and activists who have been
with us for many years may also find this
guide helpful for a fresh approach on how
to actively engage in the movement.
Fairtrade campaigners are a diverse and
energetic global movement taking action
across the UK, whether they are
passionate individuals or campaigning
with others in Fairtrade Communities,
Schools, Colleges, Universities or Places
of Worship. 
Fairtrade campaigners stand up for fairer
trade every day. That could be through
organising local events, influencing 
councils and businesses, or calling on the
government for change. Campaigners
may be convincing their workplaces to
support Fairtrade or simply encouraging
friends and family to start choosing
Fairtrade when they go shopping.
Whatever action they take, it all adds up.
The reality is that a world where trade is
fair needs action from different groups of
people – not just campaigners. This
includes progressive businesses
spearheading fair and sustainable
practices and being vocal advocates in
their industries. It also needs
policymakers and political leadership in
governments and institutions, along with
informed consumers demanding change.
We know that together we are stronger.
And it is together that we can change
modern trade structures that have grown
out of centuries of exploitation. As an
African proverb says…
Fairtrade Foundation   | 3 |   Campaign Action Guide
WELCOME!
'If you want to go fast,
go alone. If you want to
go far, go together.'
Page 167 of 312

Page 168

WHAT IS
TRADE JUSTICE?
Trade justice is the fight to change unfair
global trade and challenge the deep-rooted
power imbalances within it.
The unfair and exploitative global trade
system we live with today is a direct
result of our colonial and imperial past.
Former colonising nations of Europe, and
many of the companies based there, have
continued to hold an unfair advantage in
modern trade structures.  As a result, far
too many people living in formerly
colonised nations are simply unable to
earn enough for the essentials, no matter
how hard they work.
From the foods we eat to the clothes we
wear and so many other everyday
products, there continues to be a huge
power imbalance in global trade. One that
leaves millions unable to afford essentials
like decent food, access to clean water,
medical treatment and education for
their children.
Take cocoa, the plant we use to make
chocolate, as an example. It may be hard
to swallow but behind the sweet delight
of chocolate still lies the bitter taste of
exploitation. Cocoa was first grown on a
large scale in Africa by slaves in the 19th
century as a colonial cash crop. Today in
Ghana and Côte d’Ivoire, which account
for 60 percent of the world’s cocoa
production, a typical cocoa farmer lives on
less than £1 a day while the chocolate
industry is worth billions.
Fairtrade Foundation   | 4 |   Campaign Action Guide
i
i, Antonie Fountain & Friedel Huetz-Adams, Cocoa Barometer 2018, http://
www.cocoabarometer.org
Page 168 of 312

Page 169

Unfair trade and low pay contributes to
many adverse impacts on the human
rights of farmers and workers. Common
human rights violations in agricultural
supply chains include: low living
standards resulting in poor health; hunger
and lack of education; child labour;
discrimination against women, who are
underrepresented in decision-making, and
often face violence and harassment; and
safety hazards, such as exposure to
agrochemicals.
If that wasn’t enough to cope with, the
climate crisis is wreaking havoc on global
food production. Farmers are battling less
predictable seasons, more plant diseases
and weather extremes. They are
struggling to harvest their cocoa and
working longer hours, for lower prices.
Earning enough to live a dignified life is
something we all deserve.
As Article 23 (c) of the 1948 Universal
Declaration of Human Rights says:
‘Everyone who works has the right to just
and favourable remuneration ensuring for
himself and his family an existence
worthy of human dignity, and
supplemented, if necessary, by other
means of social protection.’
Fighting for trade justice and changing the
deeply unjust way trade is conducted
today is the only way we can ensure that
all people and our planet will have a
sustainable future.
Image: Ebrottie Tanoh Florentin, cocoa farmer
from Côte d ’Ivoire. Photo credit: Peter Caton.
Fairtrade Foundation   | 5 |   Campaign Action Guide
Page 169 of 312

Page 170

HOW FAIRTRADE
WORKS 
Fairtrade means farmers and workers in the
currently unfair trading system can earn
more income, develop knowledge networks,
access support and have a greater say in
their future. More than 2 million Fairtrade
farmers and workers in over 1,800 producer
organisations are part of the global
Fairtrade system. These farmers and
workers are located across Africa, South
America, and Asia and the Pacific. In each of
these regions, a dedicated Fairtrade
Producer Network allows farmers and
workers to share knowledge, access expert
support and feedback on how to improve
Fairtrade further. Some 47 percent of all
Fairtrade farmers produce coffee, but there
are also a huge number of other Fairtrade
products ranging from the well-known
bananas, chocolate and cotton to Fairtrade
gold, flowers and shea butter.
Dozens of Fairtrade organisations based in
countries across the world are part of our
global effort. And Fairtrade International
ties all of our work together, setting social,
economic and environmental standards for
the farmers, workers and companies
involved in a product’s supply chain.
It is the job of FLOCERT, an independent
organisation, to check that the Fairtrade
Standards have been met. To reassure
shoppers this has happened, we license the
use of the FAIRTRADE Mark on products and
packaging.
The benefits of Fairtrade have stretched
across the world. The extra income
generated by Fairtrade sales has seen
families sending children to secondary
schools and universities for the first time,
maternity clinics being built in areas that
previously had none and farmers investing
in sustainable organic methods.
But so much of this simply wouldn’t
have happened without the
campaigning work that’s helped
make Fairtrade an Awarded
Superbrand and a fixture on
supermarket shelves in the UK and
around the world.  If we keep
growing and strengthening demand
for Fairtrade, we can do even more.
Fairtrade Foundation   | 6 |   Campaign Action Guide
Page 170 of 312

Page 171

'We experienced very
difficult times when we
weren’t in Fairtrade. It
was very worrying to have
children and know you
couldn’t provide the
opportunity for the life
they deserve.'
Foncho Cantillo, banana farmer, Colombia Image: Foncho Cantillo, banana farmer,
Colombia. Photo credit: Chris Terry.
Fairtrade Foundation   | 7 |   Campaign Action Guide
Page 171 of 312

Page 172

WHY WE NEED YOU
MORE THAN EVER
So much has changed since Fairtrade
arrived in the UK. Businesses now know
they have a part to play in creating a more
sustainable future and customer demand
has forced companies to take sustainability
seriously.
Fairtrade campaigners and local grassroots
actions have raised awareness of unfair
trade and realised incredible achievements
nationally and internationally. Their
activities have boosted the growth in
Fairtrade product sales and awareness, and 
influenced shopping habits across the UK.
But for every success, there is a challenge,
and a need to evolve. Climate change has
accelerated the challenges for farmers and
workers, as it disproportionately hits small-
scale farmers in Africa, Asia, Latin America
and the Pacific, even though they have done
the least to cause the climate crisis. The
climate crisis was caused by centuries of
exploitation of people and planet by the
world’s wealthiest. The highest-earning 10
percent of people are responsible for 50
percent of global missions. But it’s the
communities already facing extreme
hardship due to unfair trade who are feeling
the worst effects of climate change and do
not have the income to cope with the
challenges it brings.
We’ve seen a welcome shift in focus for
world governments, with billions of pounds
being promised to tackle climate change.
But without addressing trade policy and
tackling the structural issues in supply
chains that deny farmers and workers their
human rights, no approach can really be
sustainable.
Businesses have changed too. Corporations
have grown across the globe, and the
technological revolution means we’re more
connected to those in other nations than
ever. Businesses are also now more
connected to their supply chains and more
aware of the impacts of how they do
business than ever before – but as
consumers and citizens, we need to make
sure their actions match their words.
Fairtrade Foundation   | 8 |   Campaign Action Guide
ii
ii, Our World in Data: https://ourworldindata.org/contributed-most-
global-co2
Page 172 of 312

Page 173

Being a Fairtrade campaigner is a powerful
action. Together we can raise awareness of
the issues of unfair trade, and demand
fairer trade deals for the farmers who
supply us with so much of our food. We can
ask the public to choose Fairtrade to
support farmers and workers right now and
raise their voices as they speak out for
climate justice. Together we can hold
companies and governments to account,
making sure they deliver on their
responsibilities, and convince more people
to choose Fairtrade so more farmers and
workers can drive positive change in their
communities.
'Over the years, the UK-wide
network of Fairtrade
campaigners and the
astonishing power of their
collective action has made the
invisible exploitation of
farmers and workers visible.
'Every single social media
post, petition signature, local
event, school presentation and
media story helps weave the
values of fair trade into our
society and influence decision-
makers to step up and drive
the change that is needed.
'With the urgent challenges of
food security, the cost of living
crisis and the climate
emergency, the power and
voice of Fairtrade
campaigners is needed now
more than ever.’
Michael Gidney, Chief Executive,
Fairtrade Foundation
Fairtrade Foundation   | 9 |   Campaign Action Guide
Page 173 of 312

Page 174

BECOMING A
FAIRTRADE
CAMPAIGNER
There are lots of ways to get involved as a
Fairtrade campaigner, whether that means joining
a group or taking action on your own.
Image: Ebrottie Tanoh Florentin, cocoa farmer from Côte d ’Ivoire. Photo credit: Peter Caton.
Fairtrade Foundation   | 10 |   Campaign Action Guide
Page 174 of 312

Page 175

HOW TO SIGN UP
Visit our Fairtrade Communities webpage for
more information about becoming a campaigner in
our Fairtrade Community scheme. You can sign up
and log in as a Fairtrade Community member on
the Community Space online platform.
In April 2000 the people of Garstang declared their small market town in
Lancashire the world’s first Fairtrade Town. Garstang has since inspired more
than 650 Fairtrade Towns, Cities, Villages, Islands, Boroughs, Counties and Zones
throughout the UK that have committed to becoming Fairtrade Communities.
Being a part of the Fairtrade Communities scheme involves teaming up with a
group of at least three people to support each other and keep up momentum
while organising local activities. There may already be an existing community
group local to you, or you can create a new group that wants to take up the cause
of fair trade locally. Once you have gathered your fellow campaigners, you can
commit to being a Fairtrade Community by filling in our online Commitment form,
telling us what you’ve already been up to and what you’ve got planned. Fairtrade
Communities can also earn special digital badges for their local activities by
logging on to our online Community Space and telling us about what they are
doing in specific 'Action Areas'. More on this below!
Fairtrade Communities help put a commitment to a fairer future at the heart of
their local communities. When Fairtrade Communities around the UK come
together, organise and take action, they create spaces where support for trade
justice can grow so loud that it cannot be ignored.
Fairtrade
Communities
Fairtrade Foundation   | 11 |   Campaign Action Guide
Page 175 of 312

Page 176

Fairtrade
Places of Worship
Faith groups and agencies were some of the earliest supporters of the fair trade
movement as it grew in the 1960s. They joined producers in actively working
towards a new form of trade to replace exploitative practices and poverty in
colonised and formerly colonised nations.
Today, churches, mosques, synagogues and other Places of Worship across the
UK remain at the heart of Fairtrade’s success. By using and promoting Fairtrade
products and encouraging public conversation about trade justice, so many Places
of Worship have put their faith into action.
Fairtrade Places of Worship use Fairtrade products wherever possible and spread
the word on trade justice within their wider congregation and community.
Operating at a local level within their religious communities, these groups work
together to drive support for trade justice.
HOW TO SIGN UP
Visit our Fairtrade Places of Worship webpage
for more information about becoming a
campaigner in this area. You can sign up and log
on to the Places of Worship online platform,
where you can download your certificate to
display with pride.
Fairtrade Foundation   | 12 |   Campaign Action Guide
Page 176 of 312

Page 177

HOW TO SIGN UP
Visit our Fairtrade Schools website
for more information about
becoming a campaigner in this
community. You can sign up and log
in as a Fairtrade Schools member on
the Fairtrade Schools Award online
platform to complete your Fairtrade
award and to gain your Fairtrade
FairAware, FairActive and
FairAchiever Awards and certificates.
Fairtrade Schools support learning about fair trade and global issues at all key
stages and levels, from nursery through to secondary school.
Schools can work their way through three award stages: FairAware, FairActive
and FairAchiever. As they move through the levels, schools are supported by a
wealth of online teaching resources that fit different curriculum areas – especially
Geography, Citizenship and PSHE. Each award criteria includes a number of
different audits which show us how you’ve integrated Fairtrade into your school,
as well as the chance to take part in learning challenges. Once schools have
achieved an award, it is valid for two years.
Our Fairtrade Schools Awards encourage students to explore their understanding
of the social and environmental impacts of their decisions, giving them the
opportunity to take real action for local and global change throughout their
education.
Fairtrade Schools
Fairtrade Foundation   | 13 |   Campaign Action Guide
Page 177 of 312

Page 178

Since the launch of our scheme in 2017, over 50 UK colleges and universities have
taken part and become Fairtrade-awarded institutions!
The Fairtrade University and College Award is conducted in partnership with
Students Organising for Sustainability UK (SOS-UK). SOS-UK is a charity that
support students and wider society to learn, act and lead for environmental
justice. Together, our partnership works with cohorts of institutions for two years
at a time to complete an award. Accreditations are then awarded and remain valid
for two years, until the next audit date.
With their passion for change, creative ideas and drive for innovation, students
enrolled in the Fairtrade Universities and Colleges scheme are an integral part of
our campaigns. By working together to support Fairtrade, students and
institutional leaders (such as lecturers, student unions, senior management, and
procurement and environmental leads) can have a hugely positive impact by
highlighting the inequalities of the global trade system to thousands of their
educational peers each year.
HOW TO SIGN UP
Visit our Fairtrade Universities and Colleges
webpage for more information about becoming a
campaigner in this community. You can sign up
and log in as a Fairtrade University and College
member on the SOS-UK website between
September and January each year.
Fairtrade Universities
and Colleges
Fairtrade Foundation   | 14 |   Campaign Action Guide
Page 178 of 312

Page 179

There’s so much you can do as an individual
campaigner, whether that’s learning about
key Fairtrade issues online, taking action on
the latest campaigns or joining in with our
campaign webinars.
INDIVIDUAL ACTION
THAT BACKS OUR
FAIRTRADE
CAMPAIGNING
For example, in 2022, our network of campaigners made
sure every single MP in the UK heard that their local
community cares about Fairtrade and climate justice.
Showing politicians there is deep-rooted support for a
fairer future across the whole of the UK is key to
convincing them to take real action.
HOW TO SIGN UP
Get our ‘latest news’ email, or follow us on social media on Facebook,
Twitter and Instagram to hear about opportunities to sign petitions,
contact your local politicians and spread the word online and offline.
Fairtrade Foundation   | 15 |   Campaign Action Guide
Page 179 of 312

Page 180

As you can see, there are many ways to use your
power as a student, consumer, activist or
community member to support Fairtrade. And
we love to hear about Fairtrade campaigners
getting creative.
To make it as simple as possible to get started, check out our 5 Action Areas. Each Action
Area is a crucial part in our joint effort to build a fairer future for trade and a potential way
your group can get involved with Fairtrade campaign. We’ve included ideas under each
Action Area that you can try out for yourselves.
Fairtrade Communities can earn special community badges for any campaigning linked to
a particular Action Area. Log in to the Community Space to find out more and start
collecting badges for your community.
Ready to get stuck in?  Check out our five Fairtrade Action Areas…
INTRODUCING
THE FAIRTRADE
ACTION AREAS
Fairtrade Foundation   | 16 |   Campaign Action Guide
Page 180 of 312

Page 181

Farmers and workers are often not even able to earn a living income or living wage – because
the price they receive for their produce is far too low. But people choosing Fairtrade products
is a proven way of driving up incomes.
To contribute to this Action Area, you can encourage local retailers, businesses and shoppers
or your own local social network to buy, stock or use Fairtrade products. For example, it could
mean you are taking part in ongoing actions or campaigns led by the Fairtrade Foundation to
drive awareness and purchase of specific Fairtrade commodities where we know that
farmers and workers need more Fairtrade sales. For Fairtrade campaigners, this could be
achieved by increasing access to Fairtrade products locally by holding a regular Fairtrade stall
at a local market, church or event.
Action Area 1:
Boosting Fairtrade
This area is all about consumer action. That is, encouraging the purchase
and use of Fairtrade products. This action is at the core of Fairtrade and
many grassroots campaigners will be well versed in campaigning this way. 
Fairtrade inspiration
'My plea is that we all buy
Fairtrade cocoa. So we
cocoa farmers, no matter
where we come from, can
earn a fair share.'
Lucy Iwenewaq, Fairtrade cocoa farmer,
Ghana.
Photo credit: Chris Terry.
Fairtrade Foundation   | 17 |   Campaign Action Guide
Page 181 of 312

Page 182

Action Area 1:
Boosting Fairtrade
Set up a stall at your local farmers’ market or craft fair to sell Fairtrade items.
Use and stock Fairtrade in your local community hall and meetings.
Encourage local schools, places of worship, colleges and universities to use and stock
Fairtrade.
Encourage a local business to stock and use Fairtrade for their staff and customers.
Explore some of our lesser-known products. For example, do your local florists and jewellers
know about Fairtrade flowers and Fairtrade gold?
Create a directory of local stores your community can buy Fairtrade from.
Encourage your social networks to choose Fairtrade.
Check out the Current Campaigns webpages for the latest actions for Boosting Fairtrade.
Check out the Boosting Fairtrade stories on our webpages to see what other campaigners
have been doing.
Ideas for Boosting Fairtrade    
Image: Lucy Iwenewaq, Fairtrade cocoa farmer, from Ghana. Photo credit: Chris Terry.
Fairtrade Foundation   | 18 |   Campaign Action Guide
Page 182 of 312

Page 183

Action Area 2:
Connecting Fairtrade
Working collectively makes us more powerful and makes our voices harder
for those who can drive change to ignore. More than ever, we need to bring
the social justice movement together. And so this Action Area is about
expanding your impact and shaping the wider movement by networking
and partnering with other individuals and groups  in Fairtrade and beyond. 
Fairtrade farmers often work together in co-operatives, making decisions together and
supporting each other. Campaigners can also come together to connect and work collectively.
To contribute to this Action Area, campaigners can actively connect with other groups across
the Fairtrade grassroots network, sharing your ideas, successes and learnings from your own
campaigning. This might mean working with the National Campaigner Committee to share
ideas and strengthen Fairtrade campaigning in the UK.
It could also mean you are networking with other
groups, individuals and partnerships outside Fairtrade
to take action together on issues such as climate change
and broader social justice. Many campaigners have had
lots of success encouraging other groups such as local
schools, universities, colleges and churches to join the
Fairtrade movement. Or you could join up with other
social justice groups such as local food projects or
environmental movements to show how trade justice
fits into the wider social justice space.
Fairtrade inspiration
Mauro da Silva, Fairtrade coffee farmer
from Brazil. Photo credit: Rodrigo Santus/
Matthew Algie.
Fairtrade Foundation   | 19 |   Campaign Action Guide
Page 183 of 312

Page 184

The Fairtrade Foundation   | 21 |   Campaigner Action Guide
Action Area 2:
Connect with local schools, places of worship, colleges, universities and Fairtrade
communities to make your group even stronger or support new groups to become Fairtrade.
Connect with other campaigners in your area who have similar values, for example eco and
trade justice groups, to share ideas, learn from each other and campaign together.
Look out for any large local manufacturing companies, plus football or sports clubs in your
area that you could connect with.
Check out the Current Campaigns webpages for the latest actions for Connecting Fairtrade.
Check out the Connecting Fairtrade stories on our webpages to see what other campaigners
have been doing.
Ideas for Connecting Fairtrade       
'I love working with
coffee, and I see a lot of
future, yes. There have
always been setbacks.
Inputs, climate change,
everything. But
together we will learn
to overcome these
difficulties.'
Mauro da Silva, Fairtrade coffee
farmer from Brazil
Photo credit: Rodrigo Santus/
Matthew Algie.
Connecting Fairtrade
Page 184 of 312

Page 185

Action Area 3:
Fair trade
Changemakers
This Action Area is about growing political support for fair trade locally. We
know that  the government and decision-makers are often driven to action
not by big organisations, but by the demands of their local constituents and
community members.
Fairtrade farmers have already shown their expertise by taking steps to tackle climate change
– for instance by planting trees and moving to greener farming methods. However, all this
costs money: they urgently need the financial support promised by richer, higher polluting
nations.
To contribute to this Action Area, you could be working with your local council or government
representative to help create the structural changes needed to make trade fairer. This might
include seeking local authority support through a council resolution to support Fairtrade
procurement, and scoping opportunities for further local procurement work through building
a relationship with them. 
It can also mean your campaign group is developing a relationship with your local
parliamentary representative (e.g. your MP, MSP, MLA or MS, or councillors). You could invite
them to meetings or events and encourage them to join any relevant Fairtrade groups or
committees such as the All-Party Parliamentary Group (APPG) for Fairtrade. 
You might also be campaigning to convince local politicians to back specific policy change.
This could involve sharing advocacy actions started by the Fairtrade Foundation or other
relevant organisations.
Fairtrade inspiration
Fairtrade Foundation   | 21 |   Campaign Action Guide
Page 185 of 312

Page 186

Invite your local representative to an event that you are hosting to engage them in local Fairtrade
activity.
Connect with your local council representatives about passing a council resolution that supports
Fairtrade in your area.
Connect with your local MP and suggest that they join the Fairtrade APPG.
Make sure you’re signed up to Fairtrade’s ‘latest news’ email, to keep up to date with petitions
and political lobbying activity.
Check out the Current Campaigns webpages for the latest actions for Fair trade Changemakers.
Check out the Fair trade Changemaker stories on our webpages to see what other campaigners
have been doing.
Ideas for Fair trade Changemakers    
'What we are looking for is
climate justice. As producers, we
know we produce the least
greenhouse  gases, but we also
get the least profit from those
processes. So, the companies who
go on to emit much more gases
should understand this. They
should not be exploiting us.'   
Andrés González, Fairtrade sugar farmer, from
Paraguay, speaking at the COP26 UN Climate Summit.
Photo credit: Fairtrade Foundation
Action Area 3:
Fair trade
Changemakers
Fairtrade Foundation   | 22 |   Campaign Action Guide
Page 186 of 312

Page 187

Action Area 4:
Fairtrade
Ambassadors
Being a Fairtrade Ambassador is about deepening your own and others'
understanding of how fairer trade supports wider social change such as
climate justice and global power balance.
To achieve climate justice, we need to address the global power imbalance. Richer nations
bear a historic responsibility for carbon emissions: the poorest half of the global population
are responsible for only around 10 percent of total global emissions, while 50 percent of these
emissions can be attributed to the richest 10 percent of people.
To contribute to this Action Area, you could be learning individually or together in your group
about the history of trade and our role within it, as well as how this links to the climate crisis
and other global and social issues. When you’re ready to, you might want to host
presentations and talks locally or run other events focused on trade and/or climate justice.
This might include running your own knowledge-sharing events about why fairer trade is a
vital part of building social justice and how it fits into this bigger dynamic.
ii
Fairtrade inspiration
You might also be offering your
knowledge at other local events or in
churches, schools or workplaces. You
can do this virtually or in person. Being a
Fairtrade Ambassador can also mean
that you are talking to your local media
for interviews or coverage on these
topics, inviting them to events that you
are hosting . Image: Ebrottie Tanoh Florentin, cocoa farmer from Côte
d ’Ivoire. Photo credit: Peter Caton.
Fairtrade Foundation   | 23 |   Campaign Action Guide
Page 187 of 312

Page 188

Action Area 4:
Fairtrade
Ambassadors
Learn more about some of our key campaign areas, such as: living income and climate justice.
Speak to your local community by holding an informational stall at your local farmers’ market
or craft fair.
Organise events and talks in your local community by using PowerPoints from the Resource
Library.
Speak to your local newspaper or radio station to get publicity.
Check out the Current Campaigns webpages for the latest actions for Fairtrade Ambassadors.
Check out the Fairtrade Ambassador stories on our webpages to see what other campaigners
have been doing.
Ideas for Fairtrade Ambassadors    
'Climate change is a
problem. It's not only
happening on a global
scale. We, the farmers,
have to live with it
every day.'
Ebrottie Tanoh Florentin, cocoa
farmer from Côte d ’Ivoire. Photo
credit: Peter Caton.
Fairtrade Foundation   | 24 |   Campaign Action Guide
Page 188 of 312

Page 189

Action Area 5:
Fairtrade Influencers
Fairtrade coffee has been the backdrop to Hugo Guerrero’s life. Hugo, who has followed in the
footsteps of his Fairtrade farmer parents to grow the crop for our cups in Peru, went on to
university after school, his higher education partly paid for from Fairtrade Premium. He’s now
using his knowledge to help his fellow farmers.
To contribute to this Action Area, you could be using your own social media account or a
dedicated channel to create and share information that helps others to understand how
important trade is in the wider issues of social and climate justice. This could include
amplifying actions and petitions, sharing Fairtrade products and stories, or sharing short films
and messages from farmers, particularly during times like Fairtrade Fortnight or Great Big
Green Week.
It can also mean using social media to connect with others and work together to share the
Fairtrade message.
This final Action Area is about growing support for fairer trade in the digital
space and deepening the understanding your social media network has of
how fair trade supports wider social change.
Fairtrade inspiration
'Within the university I learnt many things that I can
replicate and put into practice in the countryside... And in
this way I have the power to improve production within
my community.'
Hugo Guerrero Nevaca, coffee farmer from Peru.
Fairtrade Foundation   | 25 |   Campaign Action Guide
Page 189 of 312

Page 190

Action Area 5:
Fairtrade Influencers
Set up a social media page or website for your group.
Share Fairtrade-themed social media posts and messages online.
If you are a campaigner group involved in the Fairtrade Communities Scheme, opt in to feature
on our Fairtrade Community Map, so others can find you.
Check out the online Digital and Social Media Guide.
Check out the Current Campaigns webpages for the latest actions for Fairtrade Influencers.
Check out the Fairtrade Influencers stories on our webpages to see what other campaigners
have been doing.
Ideas for Fairtrade Influencers    
Image: Hugo Guerrero Nevaca, coffee farmer from Peru.  Photo credit: Eduardo Martino.
Fairtrade Foundation   | 26 |   Campaign Action Guide
Page 190 of 312

Page 191

Fairtrade Foundation, 
Unit 5.07, The Loom, 
14 Gower’s Walk, 
London, E1 8PY
fairtrade.org.uk 
We’re so grateful to the Fairtrade campaigners who keep the movement
going and continue to advocate for a fairer trade system. We couldn’t do
it without you. You help to make sure that the future is fair.
If you have any more questions about campaigning
with Fairtrade, please check out our campaigner FAQ
webpage, and if your question isn’t answered there,
please email hello@fairtrade.org.uk.
We’d love to hear from you.
Registered charity no. 1043886
A company limited by guarantee, 
registered in England and Wales no. 02733136 
THANK YOU
Fairtrade Foundation   | 27 |   Campaign Action Guide
Page 191 of 312

Page 192

Page 192 of 312

Page 193

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    PH/DG Date 17/11/23 
Environmental Key Fund (EKF) Update 
From  Pamela Humphries, Chief Officer of Place
E-mail Greerd@northlan.gov.uk Telephone David Greer, Growth
Programme Manager 
Executive Summary 
The purpose of this report is to provide committee with an update on the Environmental
Key Fund (EKF) and its delivery of the Blacklaw Windfarm Community Benefit Fund which
is received from Scottish Power Renewables Ltd. 
These funds are provided to local communities surrounding the Blacklaw Windfarm area,
such as Shotts, Hartwood, Allanton and Bonkle. North Lanarkshire Council acts as a
conduit of the funding and supports the EKF Board which is comprised of representatives
from various public and third sector organisations operating within the area. 
A number of projects and community groups have benefited from the fund, including the
Springhill Community Hall in Shotts which was recently completed. 
The council will continue to work with the EKF Board to promote the fund, ensure that the
fund’s aims and objectives are fit for purpose and maximise benefit to the eligible local
communities that this fund is intended to support. 
Recommendations
It is recommended that the Enterprise and Fair Work Committee: 
1) Acknowledge the performance report detailing the delivery of the Environmental
Key Fund and the Blacklaw Windfarm Community Benefit Fund.
2) Endorse plans to increase board membership to promote more local
representation.
3) Support proposals to review grant schemes and criteria and relaunch the Blacklaw
Windfarm Community Benefit Fund in Spring 2024. 
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement
(16) Transform our natural environment to support wellbeing and
inward investment and enhance it for current and future
generations
Programme of Work Transforming Places 
Item 5
Page 193 of 312

Page 194

1. Background 
1.1 To offset adverse community impacts caused by the construction of the Blacklaw
Windfarm, the Council receive windfarm payments from Scottish Power Renewables
(UK) Ltd. to distribute to the community. 
1.2 The Council entered into an agreement with Scottish Power Renewables (UK) Ltd in
2006 to act as fund administrator. 
1.3 Annual payment transfers were agreed at the outset between Scottish Power 
Renewables and North Lanarkshire Council as follows: 
• £1,000 per annum, per megawatt generated from Blacklaw Phase 1
• £2,500 per annum, per megawatt generated from Blacklaw Phase 1b
• £5,000 per annum, per megawatt generated from Blacklaw Stage 2 
1.4 Because of the phasing of the works, limited funding was received over the first number
of years of this agreement and no funding was distributed. 
1.5 As more funding became available, and to ensure transparency of community grant
award decisions, it was decided that the Environmental Key Fund (EKF), an established
grant award organisation in North Lanarkshire, should act as fund administrator.  The
EKF was established in 2004 to distribute Landfill Community Funding, although this
funding no longer exists and now only distribute Blacklaw Windfarm Community Benefit
Funding, and is a fully independent organisation. 
1.6 In 2016, a tri-party agreement was set up between Scottish Power Renewables (UK)
Ltd, the Council and the EKF whereby the Council would reallocate all Blacklaw
Windfarm funding they receive to the EKF. 
1.7 Following this, the Blacklaw Windfarm Community Benefit Fund was established to
award grant funding to community-based projects within an agreed eligible grant area. 
1.8  Communities such as Shotts, Hartwood, Allanton and Bonkle are within the eligible
grant application zone. A map illustrating the eligible area is provided within Appendix
1 of this report. 
1.9 The Council also has an administrative role for the EKF which includes, providing
secretarial assistance to the independent board of directors, overseeing grant
applications submitted via the EKF website and supporting community groups who
intend to submit grant applications or wish to discuss potential future projects.   
1.10 All website elements and board meetings are arranged/managed through the Council
along with the EKF bank account. All grant payments are arranged by the Council but
are signed off by at least two board directors (maximum of one from any one
organisation) for final payment. At present, there are five board directors although the
EKF Articles of Association allow a maximum of seven. 
1.11 There are currently three EKF grants available to eligible community organisations: 
• Community Grant – provides support of up to £1,000 per project
• Small Grant Fund – provides support of up to £10,000 per project 
• Blacklaw Windfarm Community Benefit Fund – provides support of up to £50,000
per project 
Page 194 of 312

Page 195

1.12 The EKF Community Grant is available for projects which either: 
• provide or improve a public space;
• encourages positive use of public green space;
• remove litter and waste from public green space;
• provides or improves biodiversity in public spaces; and/or
• encourages environmental education and engagement. 
1.13 The EKF Small Grant Fund is designed to deliver projects which either: 
• help to develop or improve a public park or other public amenity for leisure or
recreational purposes;
• conserves or improves biodiversity;
• improves or restores a place of worship or listed building or structure;
• improves energy efficiency; and/or
• reduces fuel poverty 
1.14 Applicants to the Blacklaw Windfarm Community Benefit Fund can apply for up to
£50,000 funding for projects (which can be increased in exceptional circumstances)
which meet one of the following five objectives: 
• Objective 1 - providing, maintaining or improving a public park or other community
facility (at a single identifiable site) for leisure or recreational purposes.   
• Objective 2 - protecting or improving the conservation of identified species or
habitats (at a single identifiable site) that are recognised in the UK Biodiversity
Action Plan (UKBAP) or Local Biodiversity Action Plan (LBAP).
• Objective 3 - maintaining, repairing or restoring a place of religious worship or a
building or structure that has architectural or historical significance.
• Objective 4 - encouraging the more efficient use of energy. 
• Objective 5 - reducing fuel poverty. 
2. Report 
2.1 EKF Governance/Processes 
2.1.1 The EKF Board is currently made up of five members – representatives from Voluntary
Action North Lanarkshire (VANL), Green Action Trust (GAT), Getting Better Together
Shotts (GBT) and two (one elected member and one senior officer) from North
Lanarkshire Council. 
2.1.2  It is intended to invite applications for new board members to increase this membership
to seven and promote greater representation of local groups. 
2.1.3 The board aim to meet quarterly to discuss, score and approve/reject grant applications
(although it has the ability to fast-track smaller grant applications outwith planned
meetings) and work with the Council to promote and encourage grant applications. 
2.1.4 Applications to this fund are made online (via EKF’s website) and support can be
provided to help eligible organisations apply. 
Page 195 of 312

Page 196

2.2 Finance 
2.2.1  A summary of the income and expenditure of the EKF over the last 5 years is shown
below: 
Year Opening Balance (£) Income (£) Expenditure (£) Closing Balance (£)
2018 361,370 162,122 132,615 390,877
2019 390,877 166,103 68,463 488,517
2020 488,517 170,355 168,091 490,761
2021 490,761 172,680 98,498 564,943
2022 564,943 174,888 34,644 705,167 
2.2.2 As of September 30th 2023, the EKF had a bank account balance of £658,626 with
current liabilities of £193,059 and a windfarm payment due of £190,252. As such, the
EKF currently has £682,829 Blacklaw Windfarm Community Benefit funding available
to distribute to community projects. 
2.3  Grants and Projects 
2.3.1 The Blacklaw Windfarm Community Benefit Fund grants awarded over the last two
years (and drawdown of grant to 30th September 2023) are as follows: 
EKF Project Grant Award
(£)
Drawdown to 30th September
(£)
Springhill Community Hub 200,000 200,000
Shotts Nature Park 42,134 0
Hartwood Greenspace Play
Project
69,800 0
Stane Primary 997 997
Shotts Family Learning Centre 990 990
Shotts Galaday 10,000 10,000
Shotts EU Church 10,000 0
Warm & Healthy – Fuel Poverty 40,500 0
Total 374,421 211,987 
2.3.2 Of particular recognition, £200,000 was awarded (as a ‘one-time grant’) to support the
development of Springhill Community Hall – a major £1.5M regeneration project aimed
at providing a much-needed facility in Springhill, Shotts, that will support a range of
services and leisure opportunity for the local community. This project had received
almost £1.2M funding from the Scottish Government’s Regeneration Capital Grant
Fund and was formally opened in September 2023. 
2.4  Future Delivery 
2.4.1 As well as increasing the board membership to allow for greater local representation,
it was agreed at a board meeting of the EKF directors held on the 26th of September
that a community workshop would be held towards the end of 2023 to review and
update the programmes offered by the EKF as well as use this as an opportunity to
promote the Blacklaw Windfarm Community Benefit Fund and identify potential
projects. 
2.4.2 In doing so, the EKF will work with the Council’s Community Matters Team to invite all
local groups and organisations to this event to consider various aspects of this scheme
such as:
Page 196 of 312

Page 197

• the scale of current grant awards and whether these should be increased,
particularly given rising costs;
• an appraisal of grant scheme criteria and whether the objectives of these should be
expanded to include a wider range of opportunities; and
• consideration as to whether a large-scale grant should be created to support a one-
off ‘legacy’ project (particularly given the significant funding which the EKF has
available). 
2.4.3 Following this, it is intended that the revised Blacklaw Windfarm Grant Fund would be
relaunched in Spring 2024 (although would remain open to applications in its current
format until then). 
2.4.4 Added to this, it is also intended to develop and implement a communications plan for
the EKF to continue to improve PR and promote funding opportunities. 
3. Measures of success 
3.1 Continue to promote this fund and support eligible grant applications by local
community groups and organisations. 
3.2 Undertake a full review of current grant schemes, amend these accordingly and
relaunch the Blacklaw Windfarm Grant Fund by Spring 2024. 
4. Supporting documentation 
Appendix 1 Blacklaw Windfarm Community Benefit Fund – Eligible Grant Area Map 
Pamela Humphries
Chief Officer (Place) 
Page 197 of 312

Page 198

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The EKF delivers projects that support community well-being, providing funds to
local communities to improve their environment and develop community assets
which promote and encourage a fairer society. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 198 of 312

Page 199

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Blacklaw Windfarm Community Benefit Fund funding provided through the
EKF supports a range of environmental and asset improvement projects which are
owned and maintained by local communities. A recent example of this is Springhill
Community Hall where funding was used to replace a rundown community hut with
a bespoke community hub and outdoor leisure facilities. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The EKF will make use of the council’s communications platforms to both promote
the Blacklaw Community Benefit Fund and the proposed workshop which will be
delivered to help renew and relaunch this fund. A communications plan will be
specifically developed to support the ongoing delivery of this fund. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
This report has no direct risk impact for the Council as the EKF is an entirely
independent body which has autonomy over the delivery of the Blacklaw Windfarm
Community Benefit Fund. However, a Risk Assessment is currently being
developed by the EKF to help ensure the future effective delivery of future funding
programmes and the management of this organisation. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Page 199 of 312

Page 200

Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 200 of 312

Page 201

Appendix 1 
Page 201 of 312

Page 202

Page 202 of 312

Page 203

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  JO’N/ PK Date 17/11/23 
North Lanarkshire Industries 
From  Janie O’Neill, Chief Officer (Education, South)  
E-mail ONeillJa@northlan.gov.uk Telephone 07790 894444 
1. Background
1.1 NLI is a Supported Business established by North Lanarkshire Council in 2014 and is
an example of both commercial success and social responsibility.  A Supported
Business is defined as one whose main aim is to integrate disabled or disadvantaged
people socially and professionally. Their workforce must be at least 30% disabled or
disadvantaged.  NLI has 31 staff in total of whom 25 (81%) have a range of significant
Executive Summary
North Lanarkshire Industries (NLI) is a supported business and a discrete part of
Employability Services within Education, Children and Families and all staff are North
Lanarkshire Council employees. NLI has Council and external contracts to fulfil on an
annual basis and is supported in securing new contracts by the Council’s Asset and
Procurement Solutions team as well as through its own network of contacts in the
commercial and public sectors.  The report outlines the impact of the pandemic on the
capacity of NLI, the actions it took during that period and its strong recovery to deliver its
current range of services and contracts.  The report also highlights future action proposed
to ensure income streams continue to be developed and maintained. 
Recommendations 
It is recommended that the Enterprise and Fair Work Committee: 
1) Approve the content of this report and consider the range of services and contracts
delivered by North Lanarkshire Industries 
2) Approve the development of an Action Plan for the period 2023-2026. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement
(11) Increase economic opportunities for adults by understanding,
identifying, and addressing the causes of poverty and deprivation
and barriers to financial inclusion
Programme of Work Brighter Futures
Item 6
Page 203 of 312

Page 204

disabilities.  Based in Wishaw, the facility is equipped with the latest production
machinery combined with a highly skilled, flexible workforce operating to BS EN ISO
9001:2015 quality assurance.  The supported business has a strong culture of
employee engagement, with open communication and active business development,
with employees being the key drivers in shaping its ethos and focus.
1.2 For other Council services they deliver on a range of contracts, and these include: 
- manufacturing and upholstering furniture (beds, sofas and seating areas) 
- soft furnishings (bedding and curtains)
- furniture storage service for displaced tenants 
- document storage service 
- Council fire equipment maintenance
Each of these contracts is negotiated and delivered within the terms of a contract
agreed with each customer. In terms of the benefits secured by our communities
through NLI delivering services on behalf of the Council these are at the heart of the
supported business.  NLI uses its Supported Business status to maintain its place on
the Scottish Government National Framework for Supported Businesses 
1.3 In the past NLI has worked with Edinburgh City Council designers on furniture and
furnishings on their Nurseries and Schools 21 programmes as well as supplying NLC
Education and Families contracts.  In the last few months NLI worked with Tier 1
contractor Morrisons to supply furniture and soft furnishings for the New Cortonvale
Prison. 
2. Report 
Impact of Covid 
2.1 A Business Plan for the period 2015-2020, outlining NLI’s plans, provided the basis for
the commercial strategy of the business in that period.  However, the impact of covid
restrictions, as well as having an impact on the business, also delayed the development
of a new business plan as NLI focused on adapting its business model to meet existing
contracts and services. 
2.2 Covid restrictions placed an increased burden on NLI in a variety of ways.  The majority
of the workforce, due to their disabilities, were in the shielded group and it was only
when the national vaccination programme got underway that they were able to return.
While regular contact was maintained with the staff, many within the workforce required
support in returning to work after long periods of social isolation.  On a commercial
basis, orders were no longer being placed or were being delayed and supply chains for
materials were also affected with either long delays to supplies or sharply increased
prices for materials. 
2.3 The remaining staff reacted positively to these challenges and established new income
streams as a result of the pandemic restrictions.   They set up a delivery service for
NHS Lanarkshire during the first lockdown for community pharmacies and a longer
term service for the sorting and delivery of PPE to Health and Social Care staff across
North Lanarkshire. 
Page 204 of 312

Page 205

2.4 In the last 12 months stability has returned to the workforce and to income streams
from contracts and services and there is now a focus on future sustainability with a new
Action Plan currently being developed for the period 2023-2026.   
2.5 While receiving the rewards and benefits due to all NLC employees those NLI staff with
disabilities also receive ongoing support from the management team at NLI on a range
of issues. These include training and support within the workplace in all employment
skills such as team working, communication, health and safety at work and specific
vocational skills related to their role.  In addition, staff are supported by the
management team on a range of subjects not directly related to employment, but which
are either a concern for individuals or are an issue that requires additional support
because of their disability. These are wide and varied subjects but include signposting
employees to support with housing, money management, benefits and health
challenges and, at times, acting as their advocate in such matters. Therefore, the social
return on this investment by various NLC departments in contracting services with NLI
is that 25 people with significant disabilities are employed in a real working environment
with all the rewards that having a job brings. These are not only the financial rewards
of employment; the psychological benefits of work also promote positive physical and
mental health and research tells us that those in work see their GP less often than
people who are unemployed. There is also a contribution to every community of having
residents in work and the financial security combined with a sense of pride and
purpose, that this offers employees and their families. 
Current Position 
2.5 As a Supported Business, NLI benefits from the work of the Assets and Procurement
Solutions team through their commitment to ensuring that for all Regulated
Procurement, the Council’s General Contract Standing Orders and procurement toolkit
ensure that pre-tender consideration is given to contracting opportunities that are suited
to the offerings available from Supported Businesses, including NLI.   The Council’s
Annual Procurement Report (APR) for 2022/23 shows that through the NLC contracted
services  with NLI the combined value of these arrangements amounted to a total spend
of £969,473 during the APR reporting period. 
Next Steps 
2.6  As stated above, NLI is developing its next stage Action Plan with a focus on both
income and on ensuring opportunities are available for disabled residents to be
supported in its workforce.  Alongside this there are several other actions planned for
2023: 
- Fulfilment and consolidation of current contracts within NLC
- Continued work with the Asset & Procurement Solutions team to identify
opportunities
- Awareness raising with NLC services of NLI products and goods
- Highlighting the sustainable procurement benefits to other public sector providers
within North Lanarkshire and Glasgow City Region of the benefits of working with
a local supported business
- Attendance at Scotland Excell trade conferences to exhibit goods and commercial
services available 
3. Measures of success 
3.1  Measures of success include:
Page 205 of 312

Page 206

• The implementation and mobilisation of new work streams, coupled with continuous
expansion and business growth, ensures NLI is well placed to deliver against future
business plan objectives and its commitment to support disabled persons across North
Lanarkshire.
• NLI continues to offer residents with disabilities the opportunity to enter the labour
market whilst ensuring social, environmental and economic value for money for all
stakeholders. 
4. Supporting documentation 
4.1 Not applicable.   
Chief Officer (Education, South) 
5. Impacts  
Page 206 of 312

Page 207

5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Page 207 of 312

Page 208

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Managing and monitoring service performance supports the ongoing monitoring of
the service’s risk register. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 208 of 312

Page 209

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    JO’N/ PK Date 17/11/23 
Routes to Work Ltd - Appointment of Category B Directors 
From  Janie O’Neill, Chief Officer (Education, South)  
E-mail oneillja@northlan.gov.uk  Telephone 07790 894444 
Executive Summary
This report requests approval for the appointment of three new Category B directors to
Routes to Work Limited (RTW) which accompany a change to its Articles of Association
approved at its AGM of 21 September 2023.   The change to the Articles of Association
relates to the maximum number of Category B (independent) Directors that can be
appointed to the Board and does not have any impact on the Council’s Category A
Directors or their position of authority in the governance of the organisation.   
The change to the Articles of Association proposes increasing the maximum number of
Category B Directors from eight to ten.  The reason for this is to provide capacity within the
governance subgroups operated by the Board on issues such as Finance, HR and
Governance.  In addition, two long standing members had given notice in June 2023 of
their intention to stand down at the company AGM on 21 September 2023.  A recruitment
exercise was undertaken as a matter of priority to identify up to three potential new
appointees to the Board to ensure that corporate governance arrangements could continue
to be fulfilled in accordance with the obligations and high standards of good practice
required and the three candidates for Board membership are presented to Committee for
approval. 
Recommendations
It is recommended that the Enterprise & Fair Work Committee: 
1) Approve change to Articles of Association increasing maximum number of Category
B Directors from eight to ten. 
2) Approve the appointment of the three Category B directors, referred to in section 2.1.2,
to the Board of Directors of Routes to Work Limited.  
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement
(11) Increase economic opportunities for adults by understanding,
identifying, and addressing the causes of poverty and deprivation
and barriers to financial inclusion
Item 7
Page 209 of 312

Page 210

1. Background 
1.1 Routes to Work’s Board of Directors has consisted of up to ten members – two are
Category A members appointed by North Lanarkshire Council (one is an elected
member, and one is a senior Council officer) and up to eight Category B directors, who
bring specialist expertise to the company and are selected through a formal
nominations procedure. 
1.2 The Board of Directors is responsible for ensuring that Routes to Work’s services are
delivered in accordance with approved Service Level Agreements and charitable
objectives. The Board meets quarterly to fulfil its governance responsibilities which
include operational delivery and management, staffing, financial control and reporting,
health and safety, performance monitoring and reporting and risk management. There
are three formal sub-groups of the Board that meet regularly: Governance, HR, and
Finance. 
2. Report 
2.1 Provisions of Articles of Association 
2.1.1 The Articles of Association of Routes to Work Limited include the following provisions
in respect of the composition of the Board of Directors and the appointment of
Independent Directors: 
60.2 a maximum of eight directors shall be Category B Directors, who shall be
appointed (after due consideration of the views of the board of directors) on the
basis that: 
60.2.1 they are representative of the community within the local authority area of the
Council; and/or
60.2.2 they have specialist skills or expertise which would be of assistance to the
board.
It was approved at the Routes to Work AGM held on 21 September 2023 that the
maximum number of Category B Directors be increased to ten given members
standing down and to ensure ongoing capacity to cover all aspects of the
governance of the organisation.
2.1.2 Under the terms of Article 65.1 the Council may appoint any Category B Director
(other than an officer, elected member or employee of the Council) in writing and
signed by an appropriate officer with the guidance of the company’s nominations sub-
committee.  A recruitment process was undertaken by the nominations committee of
Routes to Work Ltd which included advertising via social media and through SCVO
Good Moves recruitment page.  At its AGM of 21 September 2023, the Routes to
Work Board accepted the recommendation of its nominations committee to approve
the submission of the three candidates below, for approval by North Lanarkshire
Council: 
(i) Alan Hughes
(ii) Phillip Kinnell
Programme of Work Brighter Futures
Page 210 of 312

Page 211

(iii) David Strain 
2.1.3 The independent directors proposed for appointment have clear expertise within
areas that can support Routes to Work Ltd. A short profile of the proposed
independent directors is included in Appendix 1. 
3. Measures of success 
3.1  Routes to Work Limited continues to utilise the experience and support of
its independent directors.     
4. Supporting documentation 
4.1  Appendix 1 - Profile of Category B Directors Proposed for Re-appointment to
Routes to Work Limited Board. 
Janie O’Neill
Chief Officer (Education - South) 
Page 211 of 312

Page 212

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty   
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒
Page 212 of 312

Page 213

If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒ 
Page 213 of 312

Page 214

APPENDIX 1
Profile of Category B Director Proposed for Appointment to Routes to Work
Limited Board:
Alan Hughes
Over the course of his career in education and economic development, Alan has worked on
both policy development and operational delivery, enabling him to understand the intricate
dynamics of program implementation and its alignment with broader strategic goals. He began
his professional journey as an enterprise development officer in Craigmillar, Edinburgh, where
he spearheaded initiatives to establish community businesses and coordinated transnational
projects, empowering young individuals with essential work-related skills. Alan has spent the
largest proportion of his working life in Lanarkshire with the Lanarkshire Development Agency
and Scottish Enterprise and with the college mergers and has seen first-hand what a difference
Routes to Work has made over the years and is keen to make sure that success continues. 
Throughout his career, Alan has maintained an unwavering passion for creating opportunities
for individuals to access the job market, opening doors for their personal and professional
growth. His commitment to this cause has only deepened over the years. Recently, while
working at Fluido, Alan has been actively exploring ways to collaborate with voluntary sector
agencies to provide valuable training and employment prospects through the innovative use
of Salesforce technology. In addition to his experience in education and economic
development, Alan possesses a strong grasp of governance principles having established the
Joint Skills Committee for the Scottish Funding Council and Skills Development  Scotland. 
Current and recently held positions: 
• Graduate Mentor for Edinburgh Napier University
• GDPR and PCER champion University of Edinburgh
• Member of CRM Higher Education Group
• Advisor Larbert High Schools STEM Academy
• Member of the Scottish Governments Skills Utilisation Advisory Group
• Member of Chemicals Science Scotland Skills Group;
•  Advisory to John Cunningham Chair of MA Implementation Group(MAiG)
•  Advisory board member of the Lothian New Deal Partnership; 
Phillip Kinnell 
Phil is an expert procurement professional who has recently taken up a senior role with
Scotland Excell, having previously worked with BIP Solutions Limited for over 20 years in a
variety of procurement roles, including a secondment to the Scottish Government where he
delivered a research study to review existing approaches to public procurement remedies in
the UK and internationally (covering over 180 countries), with recommendations made for the
future development of procurement remedies in Scotland.  It was during his time at BIP
Solutions when Phil first came into contact with Routes to Work Ltd when he led on the project
in 2016 to establish our public procurement function, including analysis of the legal and
practical aspects, delivery of a Procurement Manual and Knowledge Transfer Workshops for
the wider management team and connected stakeholders. Since this commission in 2016, Phil
has provided both commissioned and pro-bono support to the management team at RTW
around various procurement matters and stated in his application that he has “long admired
Routes to Works's role in securing sustained employment and changing many thousands of
lives for the better. Working with an organisation with such a great reputation and the
opportunity to make a positive socioeconomic impact is something I know I’d find fulfilling”. 
Page 214 of 312

Page 215

Having recently left the organisation that had a commercial relationship with Routes to Work
Ltd, Phil is now free to join the Board with the support of his new employer. 
David Strain
David is a highly accomplished business leader/ mentor offering a wealth of expertise from
start-ups and charities to senior roles in blue-chip corporations. He has extensive experience
across a diverse range of industries, including consumer electronics, industrial products,
biotechnology, aerospace and oil and gas to tech start-ups and social enterprises. Consistently
driving company developments, ensuring impressive improvements in profitability and
efficiency, David is skilled in leading highly complex change management. A strategic thinker
with keen problem-solving abilities, David draws on over 25 years’ experience, bringing
invaluable insight and intrinsic worth to the Board room. 
David was born and brought up in North Lanarkshire and spent the largest slice of his career
working for Honeywell, probably the largest private sector employer in NL, where he started
as an apprentice and progressed to senior global roles.  In the last few years since moving into
semi-retirement, David has built up a portfolio of start-up investments which has allowed him
to work and support ‘young entrepreneurs’ on their journey to start and grow small businesses.
This plus involvement in third sector roles has enabled David to participate in several
mentoring, advisory board and Non-Executive Director roles which he believes could provide
valuable experience for the RTW Board.
Page 215 of 312

Page 216

Page 216 of 312

Page 217

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    KH/JL Date 17/11/23 
Fusion Assets Limited – Proposed Revisions to Articles of
Association 
From  Katrina Hassell, Chief Officer (Business and Digital)  
E-mail hassellk@northlan.gov.uk Telephone 07903 096121 
Executive Summary
Fusion Assets Limited became a wholly owned subsidiary of North Lanarkshire Council in
2008. The Arm’s Length External Organisation (ALEO) provides economic regeneration,
physical development and infrastructure projects on behalf of the Council, with a particular
focus on commercial development and land reclamation in areas where there is little
speculative development by the private sector. Fusion Assets is able to maximise the value
and impact of Vacant and Derelict Land Funding awarded to the Council by the Scottish
Government, other grant award funding and its own reserves by levering in additional
funding from the private sector through joint venture partnerships for individual projects. 
Six monthly operational and financial performance reports on Fusion Assets are submitted
by the Chief Officer (Place) to this Committee and Fusion Assets is consolidated within the
Council’s Group Accounts as a subsidiary company. 
This report focuses on proposed revisions to the company’s Articles of Association which
have been recommended by the company’s Board of Directors to strengthen governance
arrangements, reflect the requirement for meetings to be conducted remotely during the
pandemic and ensure that the Articles remain sufficiently robust, fit for purpose and support
the company in delivering its business objectives including economic regeneration,
investment and financial growth. 
The proposed changes to the Articles of Association introduce: 
i. Greater flexibility and parity of esteem between Partner and Co-opted Directors in
determining the quorum for meetings of the Fusion Assets’ Board of Directors;
ii. Provision for meetings to be held remotely if required;
iii. Strengthened governance arrangements including those that relate to the
appointment of Alternate Directors; and,
iv. Introduction of a new provision for Substitute Representatives to be nominated by
Partner Directors.
Recommendations
It is recommended that the Enterprise and Fair Work Committee: 
(1) Approves proposed revisions to the Articles of Association for Fusion Assets
Limited as summarised in this report and included in the updated Draft Articles of
Association attached as Appendix 1;
Item 8
Page 217 of 312

Page 218

1. Background 
1.1. Fusion Assets is a wholly owned subsidiary of the Council. It focuses on delivering
physical regeneration projects across North Lanarkshire and in particular the
redevelopment of vacant and derelict land and brownfield sites – a market where
there is currently limited speculative development. 
1.2. Fusion Assets utilises grant funding from the Council’s annual Vacant and Derelict
Land Fund (VDLF) allocation from the Scottish Government as enabling investment
for the acquisition and redevelopment of vacant and derelict land sites. Fusion’s
development model harnesses the value of these remediated land sites, plus loan
finance and/or Fusion’s reserves, to provide equity in the establishment of joint
venture private sector partnerships that subsequently fund and manage the
commercial redevelopment of the sites. Once the sites are complete, with any
industrial units that have been constructed either fully or partially let, the sites are
sold1 to a private sector investor with returns used to pay off loan funding and re-
invested in future regeneration projects. 
1.3. Fusion Assets is one of the Council’s longest established ALEOs having been
initially set up as a joint venture urban regeneration company between the Council
and Scottish Enterprise in 2006 following the closure of the Boots factory in Airdrie.
The company was restructured in 2008 when it became wholly owned by the
Council following Scottish Enterprise’s withdrawal from the joint venture and the
existing Articles of Association were updated at that time to reflect the change in
ownership. 
1 In some instances the terms and conditions of specific grant funding may restrict onward sale for a fixed
period and in these cases the asset is retained by Fusion Assets Ltd. 
(2) Agrees that the appointment of Alternate Directors is remitted to the meeting of
the Council on 21 December 2023 with a recommendation that four Alternate
Directors are appointed comprising two officer and two elected member
appointments;
(3) Further recommends to Council that the officer appointments will comprise a
Senior Manager within the Place Service and a Business Finance Manager within
the Finance Service;
(4) Recognises that the appointment of two elected members as Alternate Directors
will be considered by full Council at its meeting on 21 December 2023 via existing
processes; and,
(5) Acknowledges that a Special Resolution to give effect to the changes will require
to be prepared and agreed between Fusion Assets and the Council and agrees
that the Chief Officer (Legal and Democratic) is authorised to finalise and sign the
Special Resolution on behalf of the Council.  
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (3) Maximise the use of our marketable land and assets through
improved development in business and industrial infrastructure
Programme of Work Invest in North Lanarkshire 
Statutory / corporate / service requirement
Page 218 of 312

Page 219

2. Report 
Existing Articles of Association 
2.1. As the incorporation governance document, Fusion Assets’ Articles of Association
outline the purpose of the company, the rights and responsibilities of its members
and directors and the way in which the company must operate as a whole. 
2.2. The existing Articles of Association were approved in June 2008 when, following the
withdrawal of Scottish Enterprise Lanarkshire, Fusion Assets was restructured as a
wholly owned subsidiary company of North Lanarkshire Council with responsibility
for promoting industrial and commercial regeneration and encouraging economic
development in areas of established market failure where there is little speculative
development by the private sector. 
2.3. As sole shareholder the Council is responsible for appointing Directors to serve on
Fusion Assets’ Board of Directors and the Articles of Association make provision for
up to eight directors comprising five Council directors (Partner Directors) and up to
three Co-opted Directors drawn from the private sector who bring expertise, skills,
and business specialisms to the company. 
2.4. The Partner Director roles comprise three elected members and the positions of
Chief Officer (Finance) and Chief Officer (Place). 
2.5. The existing Articles of Association stipulate that the quorum for Board meetings of
Fusion Assets is four Partner Directors – the Co-opted Directors are not included in
constituting the quorum. This requirement has on a number of occasions over the
years resulted in Fusion Assets’ Board meetings being inquorate with business
having to be deferred. 
2.6. In response the Board of Directors agreed at their meeting on 24 November 2022 to
review the Articles of Association to address the limitations imposed by the current
quorum clause and also to conduct a wider review and update of the Articles to
ensure that they remain robust, fit for purpose and reflect the role of digital
technology to support virtual and hybrid meetings, as experienced during the
pandemic. 
2.7. This review has been undertaken in conjunction with the Council’s Legal and
Democratic Service and the solicitors Burness Paull acting for Fusion Assets. The
proposed amendments have been examined by colleagues from Legal and
Democratic and are accepted as reasonable revisions. 
2.8. At its meeting on 18 September 2023, the Board of Fusion Assets agreed the final
revised version of the Articles of Association and further agreed that these should be
submitted to the Council, as the sole member of the company, for consideration. 
2.9. A copy of the revised Draft Articles of Association, with a note of the Articles that
have been updated or introduced, are attached as Appendix 1. The main changes
that have been agreed by Fusion’s Board of Directors and duly assessed as
acceptable by officers within the Legal and Democratic Service are as follows. 
Remote and Hybrid Meetings 
2.10. New Articles are introduced to permit General Meetings and meetings of the Fusion
Assets’ Board of Directors to be held either completely remotely or as a hybrid
Page 219 of 312

Page 220

meeting, with one or more Directors dialling in. Fusion Assets’ Directors met
remotely during the pandemic although the Board meetings have generally reverted
to being held in person from February 2022 onwards. New Articles have also been
drafted to make onward provision should any future public health restrictions make it
unadvisable for meetings to be held in person. 
Quorum 
2.11. The quorate provisions have been amended so that any four directors present at
Board meetings form a quorum, provided that at least two of the four directors
present must be Partner Directors from the Council. This introduces greater
flexibility and provides parity of esteem for the Co-opted Directors who are all long-
standing members of the Board and bring wider business and commercial expertise. 
Alternate Directors 
2.12. The existing Articles of Association allow a Partner Director to appoint any other
Director, or an officer or elected member from the Council, to serve as an Alternate
Director should he or she be unable to attend a meeting. The existing Article is less
clear on the duration of any such appointment noting that unless the Partner
Director specifies the particular meeting(s) that the appointment relates to, the
appointment will remain in place until it is formally revoked. This arrangement also
places responsibility for identifying an appropriate Alternate Director on the Partner
Director and does not reflect the role of the Council in considering and appointing
Directors. 
2.13. The revised Articles of Association now allow the Council to nominate two or more
additional Council officers and/or elected members to act as Alternate Directors. It is
recommended that a maximum of four Alternate Directors – comprising two senior
officers and two elected members are appointed. This composition and balance
prevent the procedure from becoming overly cumbersome or bureaucratic and
provides scope to reflect particular specialisms. 
2.14. An existing Partner Director, who is unable to attend a Board Meeting, will be
required to nominate and advise Fusion Assets of their Alternate Director in advance
of the scheduled meeting. Thereafter, the Alternate Director(s) will need to be
registered with Companies House in the same manner as a full Director of the
company, although this can be done within 14 days of the relevant Board meeting.
As an Alternate Director is only appointed for one meeting (see paragraph 2.21
below) the Alternate Director will resign as Director after the relevant meeting. This
resignation will be registered at Companies House. Fusion Assets will be
responsible for notifying Companies House of these appointments and resignations. 
2.15. The Alternate Directors will be included in constituting that a meeting is quorate and
will also have voting rights as referenced further at 2.18 below. 
Council Appointment of Alternate Directors 
2.16. Referring first to the senior officer nominations, it is recommended that the
appointments reflect relevant posts rather than named individuals and are also
sufficiently flexible to accommodate instances of leave or other unavailability. To this
end, and reflecting Fusion Assets’ business objectives, the Enterprise and Fair Work
Committee is requested to recommend the appointment of ‘a Senior Manager from
within the Place Service’ and ‘a Business Finance Manager from within the Finance
Service’ as Alternate Directors and to remit this to full Council on 21 December
Page 220 of 312

Page 221

2023. These appointments maintain the emphasis on financial and economic
regeneration expertise being available to the Fusion Board. 
2.17. The appointment of an additional two elected members to serve as Alternate
Directors on the Fusion Board will also be considered at the above Council meeting
through the established, report, ‘Membership of Committees, Sub Committees,
Panels, Working Groups and Other Bodies’ which is a standing item of business on
the Council’s agenda. 
Fusion Assets - Voting Rights 
2.18. Each Partner Director or Alternate Director will have one vote each at any given
Fusion Board meeting and will no longer have the ability to allocate their vote to
another Partner Director if they cannot attend. While this is a change to the existing
Articles of Association, the existing provision and arrangement has never been used
in practise. 
Substitute Representatives 
2.19. The revised Articles of Association make explicit reference to the Partner Directors
now also being able to appoint a Substitute Representative at Board meetings.
Substitute Representatives would not have any formal voting rights and would not
count towards a quorum being in place at Board meetings. 
2.20. The intention behind the introduction of Substitute Representatives, who must either
be an officer or elected member of the Council, is to maintain the opportunities for a
Partner Director who cannot attend a Board meeting to ask an officer or elected
member to attend the board meeting which the Partner Director is unable to attend
without recourse to the formality of appointing and subsequently registering an
Alternate Director. 
Duration of Alternate and Substitute Nominations 
2.21. It should be noted that the revised Articles of Association, restrict the nomination of
an Alternate Director or Substitute Representative to a specific meeting. This means
that if a Partner Director was not able to attend a meeting, they would need to
appoint an Alternate Director or Substitute Representative for each occasion they
were unable to attend. 
Governance 
2.22. Finally a small number of new and/or updated Articles are introduced to strengthen
and/or re-state more explicitly governance, oversight and procedural matters within
Fusion Assets. These incorporate the following. 
• Stipulating that a Director shall vacate office if he or she becomes an employee
for the company.
• Introducing the entitlement for a Director, who is to be removed from office under
Section 168 of the Companie Act 2006, to be given reasonable prior written
notice of the proposed resolution and the opportunity to address the Directors’
meeting where such resolution is proposed, and the requirement that at least
two-thirds of the Directors must vote in favour of the resolution.
• Articulating the responsibility on Directors to take decisions in good faith that will
be most likely to promote the success of the company and to comply with the
Page 221 of 312

Page 222

Code of Conduct, including rules on Conflict of Interest, that may be prescribed
by the Fusion Assets’ Board at any time.
• Removing the stated obligation on Fusion Assets to appoint a company secretary
and the requirement for physical signing of Directors’ minutes. 
Next Steps 
2.23. The approval and implementation process for the proposed revisions is by way of a
Special Resolution that captures and narrates the amended and new Articles. It is
recommended that the Head of Legal and Democratic Solutions is authorised to
agree and sign the Special Resolution on behalf of the Council. Thereafter, Fusion
Assets will submit the newly adopted Articles of Association to Companies House. 
3. Measures of success 
3.1. The following measures of success are identified: 
• Appointment of two senior officers and two elected members as Alternate
Directors supporting existing Partner Directors to undertake their duties and
responsibilities as company directors; and,
• Timeous filing of the Special Resolution changing the Articles of Association with
Companies House. 
3.2. The ultimate objective in revising the Articles of Association is to ensure that Fusion
Assets Limited has robust governance arrangements in place with effective
leadership, direction, and oversight by the Board of Directors and that the Articles of
Association make adequate provision for Fusion to operate efficiently and adhere to
statutory duties and company law.   
4. Supporting documentation 
4.1. Appendix 1: Fusion Assets Limited – Updated Draft Articles of Association 
Katrina Hassell
Chief Officer (Business and Digital) 
Page 222 of 312

Page 223

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the Council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Solicitors within the Commercial and Compliance team in Legal and Democratic
have been involved from the outset in considering proposed changes to Fusion
Assets’ Articles of Association. This has included providing comments on early
drafts and confirming that the proposed revisions to the Articles of Association, as
approved by Fusion Assets’ Board of Directors on 18 September 2023, are
acceptable for consideration by the Council. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐
Page 223 of 312

Page 224

If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the Council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
The proposed revisions to Fusion Assets’ Articles of Association will help to
mitigate risks in relation to Board meetings being inquorate and ensure that the
company’s governance arrangements, conduct of meetings and business
transactions are completed efficiently and effectively. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any Council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒
Page 224 of 312

Page 225

If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 225 of 312

Page 226

APPENDIX 1
FSUION ASSETS LIMITED 
NOTE  OF  REVISED  AND  UPDATED ARTICLES  CONTAINIED  WITHIN  THE  DRAFT
ARTICLES  OF  ASSOCIATIONN  ATTACHED  AS  APPENDIX  1A 
ARTICLE(S) SECTION CATEGORY / SUMMARY
31, 32,  Notice of General Meetings
Provision for meetings to be held remotely
by audio and/or audio-visual link, including
where public health restrictions make in-
person meetings unadvisable.
36, 37, 38,
39, 41
Proceedings at General Meetings
54 Technical Objections to Remote
Participation in General Meetings
86, 94, 95,
96, 97, 98,
107
Proceedings of Directors
88, 89, 90.2 Proceedings of Directors • Increasing Quorum flexibility to recognise
Co-opted Directors;
• Requirement for at least 2 Partner
Directors rather than existing requirement
of 4 Partner Directors to constitute a
quorum; and,
• Conduct of business if a quorum is not
present.
108, 109,
110, 113,
114
Alternate Directors • Nomination of Alternate Directors by North
Lanarkshire Council;
• Appointment of Alternate Directors by
Partner Directors; and,
• Duration and voting rights of appointment.
119 to 128  Substitutes (non-Voting) • Appointment of Substitutes by Partner
Directors;
• Duration of appointment; and,
• Non-voting and excluded from quorum
68.8, 69.1 Disqualification and Removal of
Directors A series of new and/or updated Articles
designed to strengthen and/or re-state
governance arrangements more explicitly. 77, 78 Conduct of Directors
132, 133 Secretary and Minutes 
Page 226 of 312

Page 227

THE COMPANIES ACT 2006
COMPANY LIMITED BY GUARANTEE AND 
NOT HAVING A SHARE CAPITAL 
DRAFT ARTICLES OF ASSOCIATION 
OF 
FUSION ASSETS LIMITED
APPENDIX 1A
Page 227 of 312

Page 228

THE COMPANIES ACT 2006 
COMPANY LIMITED BY GUARANTEE AND 
NOT HAVING A SHARE CAPITAL 
ARTICLES OF ASSOCIATION 
of 
FUSION ASSETS LIMITED 
CONSTITUTION OF COMPANY
1. The model articles of association as prescribed in Schedule 1 to The Companies (Model
Articles) Regulations 2008 are excluded in respect of this company. 
Definitions
2. In these articles
“the Act” means (subject to article 3) the Companies Act 2006;
“conflict of interest” includes a conflict of interest and duty, and a conflict of duties;
“Conflict Situation” means any situation or matter (other than one which cannot reasonably
be regarded as likely to give rise to a conflict of interest) in which any director has or could
have a direct or indirect interest that conflicts, or possibly might conflict, with the interests of
the company including (without limitation) any such situation or matter which relates to the
exploitation of any property, information or opportunity (irrespective of whether the company
could take advantage of the property, information or opportunity);
“electronic form” has the meaning given in section 1168 of the Act;
“property” means any property, heritable or moveable, real or personal, wherever situated;
“Secretary” means the secretary of the company or any other person appointed to perform the
duties of the secretary of the company, including a joint, assistant or deputy secretary;
“subsidiary” has the meaning given in section 1159 of the Act.
3. Any reference in these articles to a statutory provision (including, for the avoidance of doubt,
a provision contained within a statutory instrument) shall be deemed to include any
modification or re-enactment of that provision in force from time to time.
Page 228 of 312

Page 229

4. Any reference to a provision of any legislation (including any statutory instrument) shall
include any statutory modification or re-enactment of that provision in force from time to time.
5. References in these articles to the singular shall be deemed to include the plural.
Objects
6. The company’s objects are: -
To promote urban regeneration and economic development within North
Lanarkshire (“the Operating Area”), focussing on property-based projects in areas
of established market failure and with a view to contributing towards sustainable
area-wide regeneration and long-term economic benefits in a manner which is in
alignment with the wider strategies for the Operating Area developed from time to
time through the community planning process; and in particular (but without
prejudice to the generality of those aims) to implement (directly and/or through a
subsidiary or joint venture company or companies) such projects (which may
include, without limitation, town centre renewal and the reuse of derelict land and
buildings) as the board of directors may consider appropriate from time to time by
reference to furtherance of the preceding aims, applying and/or reinvesting (whether
directly or via payments to any charitable company or to any other body) the net
proceeds (if any) of any such project in projects, initiatives or other interventions
which further the preceding aims.  
7. The company’s objects are restricted to those set out in article 6, but subject to article 8.
8. The company may add to, remove, or alter the statement of the company’s objects in article 6;
on any occasion when it does so, it must give notice to the registrar of companies and the
amendment will not be effective until that notice is registered on the register of companies.
Powers
9. In pursuance of the objects listed in article 6 (but not otherwise) the company shall have the
following powers: -
9.1 In implementing any project of the nature referred to above, to acquire appropriate
property interests in respect of the relevant sites, make appropriate contributions to
support roads and/or other infrastructure for the sites, obtain planning permission
and other necessary consents, secure the necessary funding, carry through the
remediation of the sites, carry out the construction or installation of roads, footpaths,
services and other works to produce serviced sites, landscaped areas, car parking,
Page 229 of 312

Page 230

public amenities and other facilities and/or construct buildings and other structures,
secure appropriate lettings, manage all or part of the completed development and
generally take all such other steps associated with the development of such sites
(which may include the grant of further leases and other rights of occupation or use
from time to time and/or disposal of the whole or any part of the development,
whether as a serviced site or following completion) as the board of directors may
consider appropriate from time to time; and such that, for the avoidance of doubt,
the company may carry out any of such steps directly and/or through a subsidiary or
joint venture company or companies.
9.2 To initiate, promote, conduct, participate in (whether via a joint venture company or
companies or otherwise), co-ordinate, monitor and/or assist (whether financially or
otherwise), other projects, initiatives and schemes of all kinds which further any of
the objects of the company.
9.3 To advise in relation to, prepare, organise, conduct and/or support conferences,
seminars and workshops, and educational and training events, courses and
programmes of all kinds. 
9.4 To commission and/or conduct research, and to publish and promote the results of
such research.
9.5 To design, prepare, publish and/or distribute information packs, leaflets, books,
newsletters, magazines, posters and other publications, audio and video recordings,
multimedia products and display materials, and to create and maintain a database or
databases.
9.6 To provide information, advisory, support and/or consultancy services which further
the objects and aims of the company.
9.7 To liaise with European, UK, Scottish and local government authorities and
agencies, local enterprise companies, local economic development companies,
voluntary sector bodies and others, all with a view to maximising the effectiveness
of the company in pursuing its objectives.
9.8 To carry on any other activity which may be appropriately carried on in connection
with any of the objects of the company.
9.9 To establish and/or participate in joint ventures and to promote companies whose
activities may further one or more of the above objects or may generate income to
Page 230 of 312

Page 231

support the activities of the company, acquire and hold shares, stocks, debentures
and other interests in such companies and carry out in relation to any such company
which is a subsidiary of the company, all such functions as may be associated with
a holding company.
9.10 To acquire and take over the whole or any part of the undertaking and liabilities of
any person entitled to any property or rights suitable for any of the objects of the
company.
9.11 To purchase, take on lease, hire, take in exchange, and otherwise acquire any
property and rights which may be advantageous for the purposes of the activities of
the company.
9.12 To improve, manage, enhance, develop, turn to account and otherwise deal with all
or any part of the undertaking, property and rights of the company.
9.13 To sell, let, hire, license, give in exchange and otherwise dispose of all or any part
of the undertaking, property and rights of the company.
9.14 To lend money and give credit to any person, with or without security, and to grant
guarantees and contracts of indemnity on behalf of any person.
9.15 To borrow money and give security for the payment of money by, or the
performance of other obligations of, the company or any other person.
9.16 To draw, make, accept, endorse, discount, negotiate, execute and issue cheques and
other negotiable or transferable instruments.
9.17 To remunerate any individual in the employment of the company and to establish,
maintain and contribute to any pension or superannuation fund for the benefit of,
and to give or procure the giving of any donation, pension, allowance or
remuneration to, and to make any payment for or towards the insurance of, any
individual who is or was at any time in the employment of the company and the
spouse, widow/er, relatives and dependants of any such individual; to establish,
subsidise and subscribe to any institution, association, club and fund which may
benefit any such person.
9.18 To oppose or object to any application or proceedings which may prejudice the
company’s interests.
Page 231 of 312

Page 232

9.19 To enter into any arrangement with any organisation, government or authority which
may be advantageous for the purposes of the activities of the company and to obtain
from any such organisation, government or authority any right, privilege or
concession.
9.20 To enter into any arrangement for co-operation or mutual assistance with any body,
whether incorporated or unincorporated.
9.21 To effect insurance against risks of all kinds.
9.22 To invest funds not immediately required for the purposes of the company’s
activities in such investments and securities (including land in any part of the world)
and that in such manner as may from time to time be considered advantageous, and
to dispose of and vary such investments and securities.
9.23 To establish and support any association or other unincorporated body having
objects altogether or in part similar to those of the company and to promote any
company or other incorporated body formed for the purpose of carrying on any
activity which the company is authorised to carry on.
9.24 To subscribe and make contributions to or otherwise support charitable bodies,
whether incorporated or unincorporated, and to make donations for any charitable
purpose connected with the activities of the company or with the furtherance of its
objects.
9.25 To accept subscriptions, grants, donations, gifts, legacies and endowments of all
kinds, either absolutely or conditionally or in trust, for any of the objects of the
company.
9.26 To take such steps (by way of personal or written appeals, public meetings or
otherwise) as may be deemed expedient for the purpose of procuring contributions
to the funds of the company, whether by way of subscriptions, grants, loans,
donations or otherwise.
9.27 To carry out any of these objects in any part of the world as principal, agent,
contractor, trustee or in any other capacity and through an agent, contractor, sub-
contractor, trustee or any person acting in any other capacity and either alone or in
conjunction with others.
9.28 To do anything which may be incidental or conducive to the attainment of any of
the objects of the company.
Page 232 of 312

Page 233

Restrictions on use of the company’s assets
10. The income and property of the company shall be applied solely towards the promotion of its
objects (as set out in article 6).
11. No part of the income or property of the company shall be paid or transferred (directly or
indirectly) to the members of the company by way of dividend, bonus or otherwise.
12. No benefit (whether in money or in kind) shall be given by the company to any director (other
than a Co-opted Director drawn from the private sector) except 
12.1 repayment of out-of-pocket expenses; 
12.2 reasonable payment in return for particular services (not being of a management
nature) actually rendered to the company; or 
12.3 reasonable remuneration paid or provided to a Director drawn from the private sector
for services provided as a director of the company.
13. No director of the company shall be appointed as a paid employee of the company, no director
(other than a Co-opted Director drawn from the private sector) shall hold any office under the
company for which a salary or fee is payable.
Liability of members
14. The liability of the members is limited.
15. Each member of the company undertakes to contribute such amount as may be required (not
exceeding £1) to the company’s assets if it should be wound up while it is a member or within
one year after it ceases to be a member, to be applied towards: 
15.1 payment of the company’s debts and liabilities contracted before it ceases to be a
member; 
15.2 payment of the costs, charges and expenses of winding up; and 
15.3 adjustment of the rights of the contributories among themselves.
General Structure
16. The structure of the company consists of:-
Page 233 of 312

Page 234

16.1 The MEMBERS – who have the right to participate in the annual general meeting
(and any other general meeting) and have important powers under the articles of
association and the Companies Act; in particular the members elect people to serve
as directors and take decisions in relation to changes to the articles of association;
16.2 The DIRECTORS – who hold regular meetings during the period between annual
general meetings, and generally control and supervise the activities of the company;
in particular, the directors are responsible for monitoring the financial position of
the company.
Qualifications for membership
17. Membership shall be open only to North Lanarkshire Council. 
Application for membership
18. Any incorporated body eligible for membership under article 17 (other than a subscriber to
the memorandum of association) which wishes to become a member shall lodge with the
company a written application for membership (in such form as the directors require); the
application for membership shall be signed on the relevant body’s behalf by an authorised
officer of that body.
19. A body eligible for membership under article 17 shall automatically constitute a member of
the company immediately upon receipt by the company of the application for membership,
duly signed in accordance with article 18.
Withdrawal from membership
20.  Any body which wishes to withdraw from membership shall lodge with the company a written
notice of retiral (in such form as the directors require), signed on its behalf by an authorised
officer of that body; on receipt of the notice by the company, it shall cease to be a member.
Register of members
21. The directors shall procure that a register of members is maintained in accordance with the
provisions of the Act and shall ensure that the appropriate entries in the register of members
are made immediately after any change in the membership of the company occurs.
General meetings 
22. All general meetings other than annual general meetings are to be called general meetings.
Page 234 of 312

Page 235

23. The directors shall convene an annual general meeting in each calendar year; not more than
15 months shall elapse between one annual general meeting and the next.
24. The directors must convene a meeting if there is a valid requisition by members (under section
303 of the Act) or a requisition by a resigning auditor (under section 518 of the Act).
25. Subject to the provisions of articles 23 and 24, the directors may convene general meetings
whenever they think fit.
Notice of general meetings
26. At least 14 clear days’ notice of each general meeting (including an annual general meeting)
must be given to all the members and directors, and (if auditors are in office at the time) to the
auditors.
27. The reference to “clear days” in article 26 shall be taken to mean that, in calculating the period
of notice, the day after the notice is posted, and also the day of the meeting, should be
excluded.
28. A notice calling a meeting shall specify the time, date and place of the meeting; it shall (a)
indicate the general nature of any business to be dealt with at the meeting;  (b) if a special
resolution (see article 33) (or a resolution requiring special  notice under the Companies Acts)
is to be proposed, also state that fact, giving the exact terms of the resolution; and (c) contain
a statement informing members of their right to appoint a proxy.
29. A notice convening an annual general meeting shall specify that the meeting is to be an annual
general meeting.
30. Notice of every general meeting shall be given in writing, and shall be: -
30.1 sent by post to the member, at the address last notified by them to the company; or 
30.2 sent by email to the member, at the email address last notified by them to the
company in hard copy form.
31. If members and directors are to be permitted to participate in a general meeting by way of
audio and/or audio-visual link(s) (see article 36), the notice (or notes accompanying the notice)
must: 
31.1 set out details of how to connect and participate via that link or links; and
Page 235 of 312

Page 236

31.2 (particularly for the benefit of those members who may have difficulties in using a
computer or laptop for this purpose) draw members' attention to the following
options:
31.2.1 participating in the meeting via an audio link accessed by phone, using
dial-in details (if that forms part of the arrangements); 
31.2.2 appointing the chairperson of the meeting as proxy, and directing the
chairperson on how they should use that proxy vote in relation to each
resolution to be proposed at the meeting; 
31.2.3 (where attendance in person is to be permitted, either on an open basis or
with a restriction on the total number who will be permitted to attend)
attending and voting in person at the meeting.
32. If participation in the meeting is to be by way of audio and/or audio-visual links - with no
intention for the meeting to involve attendance in person by two or more members in any
particular location - the place of the meeting shall, for the purposes of the notice calling the
meeting, be taken to be the place where the anticipated chairperson of the meeting is expected
to be, as at the time fixed for the commencement of the meeting; and, if it transpires that the
chairperson of the meeting is at some other place as at the commencement of the meeting, the
meeting shall be taken to have been validly adjourned to that other place.
Special resolutions and ordinary resolutions
33. For the purposes of these articles, a “special resolution” means a resolution of the members,
which is either: -
33.1 passed by 75% or more of the votes cast on the resolution at a general meeting,
providing proper notice of the meeting and of the intention to propose the resolution
has been given in accordance with articles 26 to 32; for the avoidance of doubt, the
reference to a 75% majority relates only to the number of  votes cast in favour of the
resolution as compared with the number of votes cast against the resolution, and
accordingly no account shall be taken of abstentions or members absent from the
meeting; or
33.2 passed by members representing not less than 75% of the total voting rights of
eligible members when passed by way of a written resolution, in accordance with
articles 55 to 58.
Page 236 of 312

Page 237

34. In addition to the matters expressly referred to elsewhere in these articles, the provisions of
the Companies Acts allow the company, by special resolution
34.1 to alter its name
34.2 to alter any provision of these articles or adopt new articles of association.
35. For the purposes of these articles, an “ordinary resolution” means a resolution of the members,
which is either: -
35.1 passed by majority vote (taking account only of those votes cast in favour as
compared with those votes cast against) at a general meeting, providing proper
notice of the meeting has been given in accordance with articles 26 to 32; or
35.2 passed by members representing a simple majority of the total voting rights of
eligible members when passed by way of a written resolution in accordance with
articles 55 to 58.
Proceedings at general meetings
36. The board may if they consider appropriate (and must, if that is required under article 37)
make arrangements for members and directors to participate in general meetings by way of
audio and/or audio-visual link(s) which allow them to hear and contribute to discussions at the
meeting, providing:
36.1 the means by which members and directors can participate via those link(s) are not
subject to technical complexities, significant costs or other factors which are likely
to represent - for all or a significant proportion of the membership - a barrier to
participation;
36.2 the notice calling the meeting (or notes accompanying the notice) contains the
information required under article 31; and
36.3 the manner in which the meeting is conducted ensures, so far as reasonably possible,
that those members and directors who participate via an audio or audio-visual link
are not disadvantaged with regard to their ability to contribute to discussions at the
meeting, as compared with those members and directors (if any) who are attending
in person (and vice versa). 
37. If restrictions arising from public health legislation or guidance are likely to mean that
attendance in person at a proposed general meeting would not be possible or advisable for all
Page 237 of 312

Page 238

or a significant proportion of the membership, the board must make arrangements for members
and directors to participate in that general meeting by way of audio and/or audio-visual link(s)
which allow them to hear and contribute to discussions at the meeting; and on the basis that
the requirements set out in articles 36.1, 36.2 and 36.3 will apply.
38. A general meeting may involve two or more members or directors participating via attendance
in person while other members and/or directors participate via audio and/or audio-visual links;
or it may involve participation solely via audio and/or audio-visual links.
39. References in articles 31 and 32 and articles 36 to 38 to members should be taken to include
proxies for members and authorised representatives of members.
40. No business shall be transacted at any meeting unless a quorum is present; one member,
represented by an authorised representative or by proxy, shall be a quorum.
41. An individual participating in a general meeting via an audio or audio-visual link which allows
them to hear and contribute to discussions at the meeting will be deemed to be present in
person (or, if they are not a member or the authorised representative of a member, will be
deemed to be in attendance) at the meeting.
42. If the quorum required under article 40 is not present within half an hour after the time
appointed for the meeting, or if during a meeting such a quorum ceases to be present, the
meeting shall stand adjourned to such time and place as may be fixed by the chairperson of
the meeting.
43. The Chair shall (if present and willing to act) preside as chairperson of the meeting; if the
Chair is not present and willing to act as chairperson of the meeting within 15 minutes after
the time appointed for holding the meeting, the Vice Chair shall act as chairperson of the
meeting.
44. If neither the Chair nor the Vice Chair is present and willing to act as chairperson of the
meeting within 15 minutes after the time appointed for holding the meeting, the directors
present shall elect one of their number to act as chairperson of the meeting or, if there is only
one director present and willing to act, he/she shall be chairperson of the meeting.
45. Each of the directors shall, notwithstanding that he/she is not a member, be entitled to attend
and speak at any general meeting.
46. The chairperson of the meeting may, with the consent of the meeting at which a quorum is
present (and must, if the meeting requests him/her to do so), adjourn the meeting but not for a
period in excess of thirty days; no notice need be given of an adjourned meeting.
Page 238 of 312

Page 239

Votes of members
47. Every member shall have one vote, which may be given either via its duly authorised
representative present at the meeting or by proxy.  
48. A member which wishes to appoint a proxy to vote on its behalf at any meeting (or adjourned
meeting) 
48.1 shall lodge with the company, at the company’s registered office, a written
instrument of proxy (in such form as the directors require), signed by an appropriate
officer of that member; or
48.2 shall send  by electronic means to the company at such electronic address as may
have been notified to the members by the company for that purpose, an instrument
of proxy (in such form as the directors require)
providing (in either case) the instrument of proxy is received by the company at the relevant
address not less than 48 hours before the time for holding the meeting (or as the case may be,
adjourned meeting); for the avoidance of doubt, in calculating the 48 hour period referring to
in the preceding provisions of this article 47, no account shall be taken of any part of a day
that is not a working day.
49. An instrument of proxy or electronic communication containing the appointment of a proxy,
which does not conform with the provisions of article 47, or which is not lodged or sent in
accordance with such provisions, shall be invalid.
50. A proxy appointed to attend and vote at any meeting instead of a member shall have the same
right as the member which appointed him/her to speak at the meeting and need not be a
member of the company.
51. A member which is an incorporated body may authorise an individual to act as its
representative at any general meeting of the company, providing particulars of the individual
so authorised and of the body which he/she is to represent are received by the company prior
to the commencement of the general meeting; the individual so authorised shall be entitled to
exercise the same powers on behalf of the member which he/she represents as that
incorporated body could exercise if it were an individual member.
52. The chairperson of a meeting shall not be entitled to a casting vote if an equality of votes arises
in relation to any resolution.
Page 239 of 312

Page 240

53. A vote given by proxy or by the duly authorised representative of a member which is an
incorporated body shall be valid notwithstanding that the authority of the person voting had
terminated prior to the giving of such vote unless notice of such termination was received by
the company at the company’s registered office before the commencement of the meeting or
adjourned meeting at which the vote was given.  
Technical objections to remote participation in general meetings
54. These articles impose certain requirements regarding the use of audio and/or audio-visual links
as a means of participation and voting at general meetings; providing the arrangements made
by the board in relation to a given general meeting (and the manner in which the general
meeting is conducted) are consistent with those requirements:
54.1 a member cannot insist on participating in the general meeting, or voting at the
general meeting, by any particular means; 
54.2 the general meeting need not be held in any particular place;
54.3 the general meeting may be held without any particular number of those
participating in the meeting being present in person at the same place (but
notwithstanding that, the quorum requirements - taking account of those
participating via audio and/or audio-visual links - must still be met);
54.4 the general meeting may be held by any means which permits those participating in
the meeting to hear and contribute to discussions at the meeting; 
54.5 a member will be able to exercise the right to vote at the general meeting (including
where a secret ballot is to be held) by such means as is determined by the chairperson
of the meeting (consistent with the arrangements made by the board) and which
permits that member's vote to be taken into account in determining whether or not a
resolution is passed.
Written resolutions
55. A written resolution can be passed by the members of the company (having been proposed by
either the members or the directors in accordance with the procedures detailed in Chapter 2 of
Part 13 of the Act) and will have effect as if passed by the members of the company in general
meeting; a written resolution is passed when the required majority of eligible members have
signified their agreement to it by sending to the company (in hard copy or electronic form) an
authenticated document which identifies the resolution to which it relates and which indicates
the member’s agreement to it.
Page 240 of 312

Page 241

56. For the purposes of the preceding article:-
56.1 the reference to “eligible members” is to those members who would have been
entitled to vote on the resolution on the circulation date of the resolution (which is
either (a) the date on which copies of the written resolution are sent or submitted to
the members in accordance with the procedures detailed in Chapter 2 of Part 13 of
the Act; or (b) if copies are sent or submitted to members on different days, the first
of those dates);
56.2 the reference to “required majority” is to the majority required to pass an ordinary
or a special resolution under the Act, as follows:-
56.2.1  in order to pass an ordinary resolution by way of written resolution, it
must be passed (in accordance with article 55) by members representing a
simple majority of the total voting rights of eligible members;
56.2.2 in order to pass a special resolution by way of written resolution, it must
be passed (in accordance with article 55) by members representing not less
than 75% of the total voting rights of eligible members and the resolution
must specifically state that it was proposed as a special resolution.
57. For the avoidance of doubt, a resolution to remove a director (under section 168 of the Act) or
a resolution to remove an auditor (under section 510 of the Act) cannot be proposed as a
written resolution under article 55.
58. For the purposes of article 55, a proposed written resolution will lapse if it is not passed before
the end of a period of 28 days beginning with the circulation date (as defined in article 56),
and the agreement of any member to a written resolution will be ineffective if signified after
the expiry of that period.
Categories of director
59. For the purposes of these articles
“Partner Director” means a director appointed or re-appointed under articles 61 to 64
“Co-opted Director” means a director appointed or re-appointed under articles 65 to 67.
Page 241 of 312

Page 242

Number of directors
60. The maximum number of directors (excluding for this purpose alternate directors) shall be 8;
out of that number no more than 5 shall be Partner Directors and no more than 3 shall be Co-
opted Directors. 
Appointment, removal, retirement, etc: Partner Directors
61. Subject to article 63, North Lanarkshire Council, so long as it remains a member of the
company, may by notice in writing, signed on its behalf by an appropriate officer and given to
the company
61.1 appoint any person (other than an employee of the company) who is willing so to
act to be a director (a “Partner Director”); or
61.2 remove any Partner Director appointed by that member from office as a director.
62. Any appointment or removal of a director under article 61 shall have effect from the date on
which the relevant notice is given to the company.
63. The powers conferred by article 61 shall be deemed to be limited such that the number of
individuals appointed by North Lanarkshire Council who may hold office as a director at any
given time shall not exceed five. 
64. Each of the Partner Directors shall vacate office with effect from the conclusion of each annual
general meeting, but shall then be eligible for re-appointment under article 61; if the notice re-
appointing him/her as a director is received by the company prior to the conclusion of the
annual general meeting, he/she shall continue in office as a director without interruption.
Appointment, vacating of office, re-appointment: Co-opted Directors
65. Subject to article 60, the directors may at any time appoint any individual (other than an
employee of the company) to be a director (a “Co-opted Director”) providing (a) he/she is
willing so to act and (b) they have obtained the prior approval in writing of the members in
respect of each such appointee. 
66. At the conclusion of each annual general meeting, all of the Co-opted Directors shall vacate
office.
67. Immediately following each annual general meeting, the directors may (with the prior
approval in writing of the members) reappoint any Co-opted Director who vacated office
under the preceding article at the conclusion of the annual general meeting; the directors may
Page 242 of 312

Page 243

alternatively appoint someone in his/her place (providing they have obtained the prior
approval in writing of the members in respect of the appointee) or resolve not to fill the
vacancy.
Disqualification and removal of directors
68. A director shall vacate office if:
68.1 he/she ceases to be a director by virtue of any provision of the Act or becomes
prohibited by law from being a director;
68.2 he/she is sequestrated;
68.3 he/she becomes incapable for medical reasons of fulfilling the duties of his/her office
and such incapacity has continued, or is expected to continue, for a period of more
than six months; 
68.4 in the case of a Partner Director, the body which appointed him/her ceases to be a
member of the company;
68.5 he/she resigns office by notice to the company;
68.6 he/she is absent (without permission of the directors) for more than three consecutive
meetings of directors and the directors resolve to remove him/her from office;
68.7 he/she is removed from office by ordinary resolution (special notice having been
given) in pursuance of section 168 of the Act.
68.8 he/she becomes an employee of the company
69. A resolution under article 68.7 shall be valid only if: - 
69.1 the director who is the subject of the resolution is given reasonable prior written
notice by the directors of the grounds upon which the resolution for his/her removal
is to be proposed;
69.2 the director concerned is given the opportunity to address the meeting of directors
at which the resolution is proposed, prior to the resolution being put to the vote; and
69.3 at least two thirds (to the nearest round number) of the directors then in office vote
in favour of the resolution.
Page 243 of 312

Page 244

Appointments to office
70. Directors shall be appointed to hold the offices of Chair and Vice Chair, an office carrying
special responsibility for monitoring the financial affairs of the company, and any other offices
which the directors may consider appropriate.
71. The appointments under the article 70 shall be made at meetings of directors.
72. Each office shall be held (subject to article 73) until the conclusion of the annual general
meeting which next follows; a director whose period of office expires under this article may
be re-appointed to that office under article 70 (providing that he/she is willing to act).
73. The appointment of any director to an office under article 70 shall terminate if he/she ceases
to be a director or if he/she resigns from that office by notice to the company.
74. If the appointment of a director to any office under article 70 terminates, the directors shall
appoint another director to hold the office in his/her place.
Directors’ interests 
75. Subject to the provisions of the Act and of articles 10 to 12 and provided that he/she has
disclosed to the directors the nature and extent of any personal interest which he/she has
(unless immaterial), a director (notwithstanding his/her office):
75.1 may be a party to, or have some other personal interest in, any transaction  or
arrangement with the company or any associated company;
75.2 may be a party to, or have some other personal interest in, any transaction or
arrangement in which the company or any associated company has an interest;
75.3 may be a director or secretary of, or employed by, or have some other personal
interest in, any associated company; and
75.4 shall not, because of his/her office, be accountable to the company for any benefit
which he/she derives from any such office or employment or from any such
transaction or arrangement or from any interest in any such company; 
and no such transaction or arrangement shall be liable to be treated as void on the ground of
any such interest or benefit.  
76. For the purposes of the preceding article: 
Page 244 of 312

Page 245

76.1 an interest of which a director has no knowledge and of which it is unreasonable to
expect him/her to have knowledge shall not be treated as an interest of his/hers; 
76.2 the references to “associated company” shall be interpreted as references to any
subsidiary of the company or any other company in which the company has a direct
or indirect interest.
Conduct of directors
77. It is the duty of each director of the company to take decisions (and exercise his/her other
powers and responsibilities as a director) in such a way as he/she considers, in good faith, will
be most likely to promote the success of the company in achieving its objects (as set out in
article 6) and irrespective of any office, post, engagement or other connection which he/she
may have with any other body which may have an interest in the matter in question.
78. Each of the directors shall comply with the code of conduct (incorporating detailed rules on
conflict of interest) prescribed by the board of directors from time to time; for the avoidance
of doubt, the code of conduct shall be supplemental to the provisions relating to the conduct
of directors contained in these articles, and the relevant provisions of these articles shall be
interpreted and applied in accordance with the provisions of the code of conduct in force from
time to time.
Directors’ remuneration and expenses
79. No director (other than a Co-opted Director) shall be entitled to any remuneration, whether in
respect of his/her office as director or as holder of any office under article 70; a Co-opted
Director drawn from the private sector may be remunerated for carrying his/her ordinary duties
as a director. 
80. The directors may be paid all travelling, hotel and other expenses properly incurred by them
in connection with their attendance at meetings of directors, general meetings, meetings of
committees of directors or otherwise in connection with the carrying-out of their duties.
Powers of directors
81. Subject to the provisions of the Act and of these articles, and to any directions given by special
resolution, the business of the company shall be managed by the directors who may exercise
all the powers of the company; no alteration of these articles and no direction given by special
resolution shall invalidate any prior act of the directors which would have been valid if that
alteration had not been made or that direction had not been given.
Page 245 of 312

Page 246

82. The powers conferred by article 81 shall not be limited by any special power conferred on the
directors by these articles.
83. A meeting of directors at which a quorum is present may exercise all powers exercisable by
the directors.
Proceedings of directors
84. Subject to the provisions of these articles, the directors may regulate their proceedings as they
think fit.
85. Any director may call a meeting of the directors or request the secretary (if there is a secretary
in office at the time) to call a meeting of the directors.
86. If directors are to be permitted to participate in a meeting of the directors by way of audio
and/or audio-visual link(s), the directors must, in advance of the meeting, be provided with
details of how to connect and participate via that link or links; and (particularly for the benefit
of those directors who may have difficulties in using a computer or laptop for this purpose)
the directors' attention should be drawn to the following options:
86.1 participating in the meeting via an audio link accessed by phone, using dial-in details
(if that forms part of the arrangements);  
86.2 (where attendance in person is to be permitted, either on an open basis or subject to
a restriction on the total number who will be permitted to attend) the ability to attend
the meeting in person.
87. Questions arising at any meeting of directors shall be decided by a majority of votes; the
chairperson of a meeting of directors shall have a second or casting vote.
88. The quorum for the transaction of business of the directors shall (subject to articles  89 and
90) be four, of whom not less than two must be Partner Directors.
89. A person acting as alternate director, shall, if his/her appointer is not present, be counted in
the quorum.
90. If the quorum required under article 88 is not present within half an hour after the time
appointed for the meeting, or if during a meeting such a quorum ceases to be present, 
90.1 the meeting shall stand adjourned to such time and place as may be fixed by the
chairperson of the meeting; or
Page 246 of 312

Page 247

90.2 the chairperson of the meeting may decide that any resolutions which were to be
proposed at the inquorate meeting shall, instead, be circulated for approval by the
directors in accordance with the written resolution procedure under article 100.
91. The continuing directors or a sole continuing director may act notwithstanding vacancies, but
if the number of remaining directors is less than the number fixed as the quorum, they or he/she
may act only for the purpose of filling of vacancies or of calling a general meeting.
92. Unless he/she is unwilling to do so, the Chair shall preside as chairperson at every meeting of
directors at which he/she is present; if the Chair is unwilling to act as chairperson or is not
present within fifteen minutes after the time appointed for the meeting, the Vice Chair shall
preside as chairperson.
93. If neither the Chair nor the Vice Chair is present and willing to act as chairperson at a meeting
of directors within 15 minutes after the time appointed for the meeting, the directors present
shall appoint one of their number to be chairperson of the meeting.
94. The board may, if they consider appropriate (and must, if this is required under article 95)
allow directors to participate in a meeting of directors by way of audio and/or audio-visual
link(s) which allow them to hear and contribute to discussions at the meeting, providing:
94.1 the means by which directors can participate in this manner are not subject to
technical complexities, significant costs or other factors which are likely to represent
- for all, or a significant proportion, of the directors - a barrier to participation; and
94.2 the manner in which the meeting is conducted ensures, so far as reasonably possible,
that those directors who participate via an audio or audio-visual link are not
disadvantaged with regard to their ability to contribute to discussions at the meeting,
as compared with those directors (if any) who are attending in person (and vice
versa).
95. If restrictions arising from public health legislation or guidance are likely to mean that
attendance in person at a proposed board meeting would not be possible or advisable for one
or more of the directors, the board must make arrangements for directors to participate in that
board meeting by way of audio and/or audio-visual link(s); and on the basis that:
95.1 the requirements set out in articles 94.1 and 94.2 will apply; and
95.2 the board must use all reasonable endeavours to ensure that all directors have access
to one or more means by which they may hear and contribute to discussions at the
meeting.
Page 247 of 312

Page 248

96. A meeting of directors may involve two or more directors participating via attendance in
person while other directors participate via audio and/or audio-visual links; or it may involve
participation solely via audio and/or audio-visual links.
97. Where a director or directors are participating in a meeting of directors via an audio or audio-
visual link, they may cast their vote on any resolution orally, or by way of some form of visual
indication, or by use of a voting button or similar, or by way of a message sent electronically.
98. The directors shall be entitled to allow any person to attend (whether in person or by way of
an audio or audio-visual link) and speak (but not vote) at any meeting of the directors; a person
invited to attend a meeting of the directors under the preceding provisions of this article shall
not be entitled to exercise any of the powers of a director, and shall not be deemed to constitute
a director for the purposes of the Act, or any provision of these articles.
99. All acts done by a meeting of directors or by a meeting of a committee of directors or by a
person acting as a director shall, notwithstanding that it is afterwards discovered that there was
a defect in the appointment of any director or that any of them was disqualified from holding
office or had vacated office or was not entitled to vote, be as valid as if every such person had
been duly appointed and was qualified and had continued to be a director and had been entitled
to vote.
100. A resolution in writing signed by all the directors entitled to receive notice of a meeting of
directors or of a committee of directors shall be as valid and effectual as if it had been passed
at a meeting of directors or (as the case may be) a committee of directors duly convened and
held; it may consist of several documents in the same form each signed by one or more
directors.
101. A resolution signed by an alternate director need not also be signed by his/her appointer; a
resolution signed by a director who has appointed an alternate director need not be signed by
the alternate director in that capacity.
102. A director shall not vote at a meeting of directors or at a meeting of a committee of directors
on any resolution concerning a matter in which he/she has, directly or indirectly, a personal
interest or duty (unless immaterial) which conflicts or may conflict with the interests of the
company.
103. For the purposes of the preceding article:-
103.1 an interest of a person who is taken to be connected with a director for any  purpose
of the Act shall be treated as a personal interest of the director;
Page 248 of 312

Page 249

103.2 an interest of the appointer of an alternate director shall be treated as a personal
interest of the alternate director;
103.3 a director shall (subject to article 103.4) be deemed to have a personal interest in
relation to a particular matter if a body in relation to which he/she is an employee,
director, member of the management committee, officer or elected representative
has an interest in that matter;
103.4 a Partner Director shall not be deemed to have a personal interest in relation to a
particular matter by reason only of the fact that he/she is an employee, officer or
elected representative of North Lanarkshire Council.
104. A director shall not be counted in the quorum present at a meeting in relation to a resolution
on which he/she is not entitled to vote. 
105. The company may by ordinary resolution suspend or relax to any extent, either generally or in
relation to any particular matter, the provisions of articles 102 to 104 
106. If a question arises at a meeting of directors or at a meeting of a committee of directors as to
the right of a director to vote, the question may, before the conclusion of the meeting, be
referred to the chairperson of the meeting; his/her ruling in relation to any director other than
himself/herself shall be final and conclusive.
107. The principles set out in article 54 (technical objections to remote participation) shall apply in
relation to remote participation and voting at a meeting of directors, as if each reference in that
article to a member were a reference to a director and each reference in that article to a general
meeting were a reference to a meeting of directors.
Alternate directors
108. North Lanarkshire Council may, from time to time, nominate (by notice to the company) one
or more senior officers and one or more elected members of North Lanarkshire Council who
shall each be available for appointment as an alternate director under article 109, and may
withdraw the nomination (by notice to the company) of any individual so nominated by it.  
109. Any Partner Director may (subject to article 110) appoint one of the individuals nominated by
North Lanarkshire Council under article 108, to be an alternate director and may remove from
office an alternate director so appointed by him/her.
Page 249 of 312

Page 250

110. A Partner Director may not appoint as an alternate director any individual who has already
been appointed as an alternate director by another Partner Director in respect of the same
meeting.
111. A Co-opted Director shall not be entitled to appoint an alternate director.
112. Any appointment or removal of an alternate director may be effected by notice to the company
signed by the Partner Director making or revoking the appointment or may be effected in any
other manner approved by the directors.
113. A notice appointing an alternate director must include details of not more than one particular
meeting that the appointment is to relate to; the alternate director appointment will only be
valid to the extent of the meeting specified within the notice of appointment; without prejudice
to article 116, an alternate director shall cease to be an alternate director on conclusion of the
meeting specified in the notice of appointment.
114. An alternate director shall, subject to the terms of the notice of appointment, only be entitled
to be given notice of the relevant meeting of directors or of the relevant meeting of committees
of directors of which his/her appointer is a member, to attend and vote at any such meeting at
which the director who appointed him/her is not personally present.
115. An alternate director shall not be entitled to receive any remuneration from the company for
his/her services as an alternate director.
116. An alternate director shall, subject to the following article, cease to be an alternate director if
his/her appointer ceases to be a director.
117. An alternate director shall alone be responsible for his/her own acts and defaults; an alternate
director shall not be deemed to be the agent of the director appointing him/her.
118. References in these articles to directors shall, unless the context otherwise requires, be
construed as including alternate directors.
Substitutes (non-voting)
119. Any Partner Director may (subject to article 120) appoint any individual, who is willing to act,
to be a substitute and may remove a substitute so appointed by him/her.
120. An individual may only be appointed as a substitute under article 119 if he/she is an officer or
elected member of North Lanarkshire Council.
121. A Co-opted Director shall not be entitled to appoint a substitute.
Page 250 of 312

Page 251

122. Any appointment or removal of a substitute may be effected by notice to the company signed
by the Partner Director making or revoking the appointment or may be effected in any other
manner approved by the directors.
123. A notice appointing a substitute must include details of not more than one particular meeting
that the appointment is to relate to; the substitute appointment will only be valid to the extent
of the meeting specified within the notice of appointment; without prejudice to article 126, a
substitute shall cease to be a substitute on conclusion of the meeting specified in the notice of
appointment.
124. A substitute may, subject to the terms of the notice of appointment, attend (whether in person
or by way of an audio or audio-visual link) and speak (but not vote) at the relevant meeting of
directors or of the relevant meeting of committees of directors of which his/her appointer is a
member and at which her/his appointor is not present.
125. A substitute shall not be entitled to receive any remuneration from the company for his/her
services as a substitute.
126. A substitute shall, subject to the following article, cease to be a substitute if his/her appointer
ceases to be a director.
127. A substitute shall alone be responsible for his/her own acts and defaults; a substitute shall not
be deemed to be the agent of the director appointing him/her.
128. A substitute shall not be entitled to exercise any of the powers of a director and shall not be
deemed to constitute a director for the purposes of the Act, or any provision of these articles.
Delegation to committees of directors and holders of offices
129. The directors may resolve to delegate any of their powers to any committee of directors
consisting of two or more directors; they may also delegate to the Chair or a director holding
any other office such of their powers as they consider appropriate.
130. Any delegation of powers under the preceding article may be made subject to such conditions
as the directors may impose and either collaterally with or to the exclusion of their own
powers, and may be revoked or altered.
131. Subject to any condition imposed in pursuance of the preceding article, the proceedings of a
committee consisting of two or more directors shall be governed by the articles regulating the
proceedings of meetings of directors so far as they are capable of applying.
Page 251 of 312

Page 252

Secretary
132. The directors may (notwithstanding the provisions of the Act) appoint a company secretary,
and on the basis that, if they do so, the term of office, remuneration (if any) and other terms
and conditions attaching to the appointment of the company secretary shall be as determined
by the directors; any company secretary may be removed by the directors at any time.
Minutes
133. The directors shall ensure that minutes are made (in books kept for the purpose) of all
proceedings at general meetings, meetings of the directors and meetings of committees of
directors; a minute of a meeting of directors or of a committee of directors shall include the
names of the directors present.
Accounts
134. Accounting records shall be kept in accordance with all applicable statutory requirements and
such accounting records shall, in particular, contain entries from day to day of all sums of
money received and expended by the company and the matters in respect of which such receipt
and expenditure take place and a record of the assets and liabilities of the company; such
accounting records shall be open to inspection at all times by any director of the company.
Notices
135. Any notice to be given in pursuance of these articles shall be given either in writing or by way
of electronic means.
136. The company may give any notice to a member either personally or by sending it by post in a
pre-paid envelope addressed to the member at its registered address or by leaving it at that
address; in the case of a member who has notified the company of an electronic address to be
used for this purpose, the company may give any notice to that member by electronic means.
137. A member may give any notice to the company either by sending it by post in a pre-paid
envelope addressed to the company at its registered office or by leaving it, addressed to the
company secretary, at the company’s registered office or (where the company has notified the
member of an electronic address to be used for this purpose) by way of electronic means.
138. Any notice, if sent by post, shall be deemed to have been given at the expiry of 24 hours after
posting; for the purpose of proving that any notice was given, it shall be sufficient to prove
that the envelope containing the notice was properly addressed and posted.
Page 252 of 312

Page 253

139. Any notice sent by electronic means shall be deemed to have been given at the expiry of 24
hours after it is sent; for the purpose of proving that any notice sent by electronic means was
indeed sent, it shall be sufficient to provide any of the evidence referred to in the relevant
guidance issued from time to time by the Chartered Institute of Secretaries and Administrators.
140. A member present or represented at any meeting of the company shall be deemed to have
received notice of the meeting and, where requisite, of the purposes for which it was called.  
Winding-up
141. If the company is wound up, the liquidator shall give effect to the provisions of article 15.
142. If on the winding-up of the company any property remains after satisfaction of all the
company’s debts and liabilities, such property shall not be paid to or distributed among the
members of the company but shall be transferred to some other body or bodies (whether
incorporated or unincorporated) operating for the benefit of the Operating Area whose objects
are altogether or in part similar to the objects of the company and whose constitution restricts
the distribution of income and assets among members to an extent at least as great as does
articles 10,11 and 12.
143. The body or bodies to which property is transferred under article 142 shall be determined by
the members of the company at or before the time of dissolution or, failing such determination,
by such court as may have or may acquire jurisdiction.
144. To the extent that effect cannot be given to the provisions of articles 142 and 143, the relevant
property shall be applied to some similar object or objects.
Indemnity
145. Every director or other officer or auditor of the company shall be indemnified (to the extent
permitted by sections 232, 234, 235, 532 and 533 of the Act) out of the assets of the company
against any loss or liability which he/she may sustain or incur in connection with the execution
of the duties of his/her office including, without prejudice to that generality (but only to the
extent permitted by those sections of the Act), any liability incurred by him/her in defending
any proceedings, whether civil or criminal, in which judgement is given in his/her favour or
in which he/she is acquitted or in connection with any application in which relief is granted to
him/her by the court from liability for negligence, default, breach of duty or breach of trust in
relation to the affairs of the company.
146. For the avoidance of doubt, the company shall be entitled to purchase and maintain for any
director insurance against any loss or liability which any director or other officer of the
Page 253 of 312

Page 254

company may sustain or incur in connection with the execution of the duties of his/her office,
and such insurance may extend to liabilities of the nature referred to in section 232(2) of the
Act (negligence etc. of a director). 
Page 254 of 312

Page 255

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  JO’N/ PK Date 17/11/23 
Strategic Performance Framework - latest performance results for
Employability 
From  Janie O’Neill, Chief Officer (Education, South)  
E-mail ONeillJa@northlan.gov.uk Telephone 07790 894444 
1. Background 
1.1 There are six inter-related strategic frameworks which are key to assessing the success
of The Plan for North Lanarkshire and monitoring delivery towards achieving the overall
Executive Summary
Driving up the employment rate in North Lanarkshire is a cornerstone of The Plan for North
Lanarkshire and ensuring employability support is available to all is recognised as a major
contributor to both local economic development and tackling poverty. Supporting
unemployed and underemployed residents into fair and sustained employment and
supporting all young people into a positive destination remain the priorities within
Education, Children and Families.  The Strategic Performance Framework enables
progress against strategic priorities and day to day operations to be regularly reported to
service committees. This allows Elected Members to monitor, assess, and scrutinise
performance to identify areas requiring improvement and inform future decision making. 
The report highlights the number of residents supported into employment in Q1 2023/24
as well as detailing the current employability issues and challenges within our communities. 
Alongside this the annually measured indicators are available to offer context on
performance  across a range of indicators. 
Recommendations 
It is recommended that the Enterprise and Fair Work Committee: 
(1) Review the high-level performance overview presented in Appendix 1, and the
supporting data contained within the linked Excel spreadsheet, and identify where
further information is required to understand or investigate performance further. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Item 9
Page 255 of 312

Page 256

vision by ensuring each stage is appropriately aligned, planned, guided, implemented,
and governed.   
1.2 The six frameworks focus on ensuring a corporate one council approach in respect of
Policy, Governance, Performance, Self-Evaluation, Project Management, and
Demonstrating Improved Outcomes for Communities.   
1.3 The Strategic Performance Framework comprises performance measurement at three
levels (as per the diagram on the right).  This aims to
collectively provide an overview of performance to help
understand the impact of Council activities on improving
services and outcomes for the people and communities of
North Lanarkshire.  The measures in this Framework allow for
day to day activities, and progress towards achieving the long-
term vision set out in The Plan for North Lanarkshire, to be
regularly monitored, reported, assessed, and scrutinised.   
1.4 The Strategic Performance Framework is aligned to the Accounts Commission 
statutory direction which places a requirement on councils to report a range of
information in terms of (1) improving local services and outcomes, and (2)
demonstrating Best Value.  Key points of note in this respect are that the Accounts
Commission also expect to see: 
(a) A balance in reporting areas of improvement that have been achieved and not
achieved.
(b) Reporting that is undertaken in a timely manner.
(c) Easy access to performance information for all citizens and communities. 
1.5 A Performance Reporting Schedule supports the timely submission of a range of
performance information that facilitates Elected Members and senior management to
undertake regular performance reviews that inform scrutiny, challenge, and decision
making processes.  This Schedule, endorsed by the Audit and Scrutiny Panel in
February 2023, includes Chief Officer’s individual six monthly Performance Reviews at
Service Committees in line with the Strategic Performance Framework. 
1.6 This report therefore presents the Enterprise and Fair Work Committee with the latest
performance results for a range of Employability measures for Members’ further review
and scrutiny. 
2. Strategic Performance Framework 
Enterprise and Fair Work Committee responsibilities 
2.1 In line with the terms of reference outlined in the Scheme of Administration, the
Enterprise and Fair Work Committee is responsible for monitoring and reviewing
performance information for the following Ambition Statements from The Plan for North
Lanarkshire: 
5.  Grow and improve the sustainability and diversity of North Lanarkshire’s
economy.
6.  Raise attainment and skills for learning, life, and work to enhance opportunities
and choices. 
2.2 The high-level performance overview in Appendix 1 presents Members with a summary
of the latest results for each performance indicator within the remit of the Chief Officer
Page 256 of 312

Page 257

(Education, South) relating to a range of Employability measures. 
2.3 The information in Appendix 1 comprises the following: 
• An ideal direction arrow - this indicates
whether a higher or lower figure is the
preferred direction of travel.  
• Measurement unit - for example whether the result is a %, a number, a unit cost
(in £), or a ratio.
• Performance results for the last five financial years (depending on availability of
data) along with the latest year’s target and corresponding RAG status (for
indicators where it is appropriate to set targets).   
• The most recent monthly or quarterly results, along with the corresponding target
and RAG status.  Note the inclusion of this information is dependent on the
measurement frequency of the indicator and availability of data as at the time of
reporting. 
• A trend graph - this captures the direction of travel achieved over the five financial
years and includes the most recent monthly or quarterly results where available.
• Comments - narrative summarising the current position and providing an
explanation for any significant variations in performance.  Where applicable, this
narrative also highlights the effect of the pandemic on service delivery, e.g. any
increase or decrease in the volume of transactions or enquiries processed. 
2.4 A large volume of data supports the high-level performance overview in Appendix 1. 
This is outlined in the latest performance results for Employability Excel
spreadsheet which is available through the following link for Members to carry out a
deep dive and review and scrutinise each performance indicator further.  The Menu on
the second tab of the spreadsheet contains built in hyperlinks that automatically take
the user to a tab for each performance indicator and therefore provides a useful
navigation aid to review the contents of the file.
• Latest performance results for Employability.xlsx 
Current context 
2.5 The labour market in North Lanarkshire has significantly changed in the post pandemic
period with several positive trends emerging.   These include low unemployment,
increases in average pay and sustained levels of participation in the labour market for
young people.  The key challenge that has emerged in the wake of the pandemic is the
increase in economic inactivity, particularly in the numbers classified as long-term sick
in North Lanarkshire which has risen from 16,500 in March 2020 to 25,400 in March
2023, though this has reduced from 28,400 in September 2022.  A combination of these
factors has also led to some local employers and sectors finding it difficult to recruit and
retain employees.  Also within the context of employability is the challenge of
persuading unemployed and economically inactive residents that they can be better off
in work and the current cost of living crisis has intensified that challenge.   A marketing
campaign under the banner of North Lanarkshire’s Working, designed in conjunction
with Corporate Communications, has recently been launched and has seen an
immediate increase in self-referrals for employment support.  In addition, the existing
cross service work with the Tackling Poverty team and other services continues to be
 A higher figure is better
 A lower figure is better
Key to RAG status
Green Performance is on target and/or within acceptable thresholds
Red Performance does not meet target and is outwith acceptable thresholds
Blue Performance surpasses the target and exceeds expectations
Page 257 of 312

Page 258

integral to the work of the employability team. 
North Lanarkshire Council funded employability programmes have always been adept
at aligning any sources of external funding available to Council plans and strategies
and to increase their scale and reach.  The current external funding environment has
been considerably bolstered in recent years by additional resources from the Scottish
Government to support their No One Left Behind policy and Young Person’s Guarantee
to alleviate the impact of the pandemic restrictions on the labour market.  These
sources have been used alongside the long term support the Council has gained from
the European Social Fund.  The external funding environment has now changed with
the end of EU funding and the introduction of the UK Shared Prosperity Fund.  In
parallel to this change, there is the introduction by the Scottish Government of
significant funding in 2023/24 for local employability services to support parents into
employment and several initiatives and programmes targeting parents for support are
now underway. 
Recent performance highlights 
2.6  With respect to the numbers of unemployed residents accessing Council support these
have grown in tandem with the increased external funding that was available in recent
times.  All Council funded programmes are targeted at people who are not only
unemployed, but who have additional barriers to getting a job.  Alongside this the
numbers supported into employment in Quarter 1 2023/24 have been above target with
the conversion from engagement to job entry remaining consistent, despite the fast-
changing labour market.  Most importantly, the percentage of people supported into
employment that have sustained employment is 70% or over. This performance has
consistently benchmarked North Lanarkshire Council programmes of support above
the national and family group of similar councils.   The change in investment from EU
funds to Shared Prosperity Funds has taken place fully in July 2023 with no interruption
to the service to residents.  In relation to support targeting parents early successes
have been in joint work with the NLC Recruitment team and with NHS Lanarkshire to
provide fully funded work placements for parents on low incomes for up to 6 months
with support to apply for vacancies within both organisations. 
In terms of the work to close the disability employment gap in North Lanarkshire, the
Supported Employment team continued to work with over 200 disabled people every
year using their person-centred model of support, with consistently higher rates of
employment sustainability at 6 months after job entry than mainstream programmes. 
Alongside their work with adults, they continue the work piloted using the Young
Person’s Guarantee in 2021/22 in supporting the transition from school of young people
who have additional support needs or who are care experienced, into long term work
placements leading to employment in a range of sectors.    
Areas of performance requiring improvement 
2.7 The number of economically inactive residents, particularly those with long term health
conditions, remains high and programmes are being adapted to support this group
towards employment or training.  Therefore, together with the continued delivery of
large-scale employability support to all unemployed and underemployed residents,
more targeted approaches for specific groups are being developed and launched which
address the local labour market priorities. Within employability programmes for 2023/24
there are specific initiatives which focus on youth employment, long term
unemployment and parental unemployment as part of the drive to reduce child poverty.  
The current demand for labour for some sectors and employers will not be met without
additional measures.  Therefore, a challenge fund which offers sector specific training
Page 258 of 312

Page 259

is being developed for use within the Shared Prosperity Fund for early 2024 and will
aim to meet the needs of local employers.
Next steps 
2.8 As noted in paragraph 1.5, the Strategic Performance Framework is supported by a
Performance Reporting Schedule.  This sets out the arrangements for service,
statutory, and Strategic Performance Framework reporting to committee.  In this
respect the relevant Committee can expect to receive the following in respect of
Employability areas of work during 2023/24. 
Report Description Committee Committee
cycle
Routes to
Work 
Routes to Work, established in 2002, is a
company limited by guarantee with
charitable status which is wholly owned by
the council. The organisation provides a
range of free employability services to
North Lanarkshire residents and specialises
in providing case worker support to
unemployed residents as well as support
with accessing vocational training and the
short-term costs associated with moving
from benefits to employment, such as
childcare and travel.
• Latest report in May 2023:
https://mars.northlanarkshire.gov.uk/egenda/image
s/att100587.pdf 
Enterprise
and Fair
Work
Committee
Cycles 2 and
4 in 2023 
3. Measures of success 
3.1  Measures of success include:
• Regular oversight and monitoring of performance across the organisation to gain
assurances in terms of governance and accountability.
• Regular review and challenge processes to scrutinise the performance of the
council to ensure effective use of resources and that resources are directed in
accordance with agreed policy and according to priorities, while ensuring sound
decision making and clear accountability for the use of resources in achieving
improved outcomes for service users and the local community.  
• Performance monitoring, management, and reporting arrangements that support
the demonstration of improved performance in local services and outcomes, and
the delivery of Best Value. 
4. Supporting documentation 
4.1 Appendix 1 -  High-level performance overview - Employability 
Chief Officer (Education, South) 
Page 259 of 312

Page 260

5. Impacts   
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 260 of 312

Page 261

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Managing and monitoring service performance supports the ongoing monitoring of
the service’s risk register. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐  
Page 261 of 312

Page 262

Appendix 1
Employability
High-level performance overview - as at September 2023 
Page 262 of 312

Page 263

Page 263 of 312

Page 264

Page 264 of 312

Page 265

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  PH Date 17/11/23 
Strategic Performance Framework - latest performance results for
Place 
From  Pamela Humphries, Chief Officer (Place)  
E-mail HumphriesP@northlan.gov.uk Telephone 07939 280710 
1. Background 
1.1 There are six inter-related strategic frameworks which are key to assessing the success
of The Plan for North Lanarkshire and monitoring delivery towards achieving the overall
vision by ensuring each stage is appropriately aligned, planned, guided, implemented,
and governed.   
1.2 The six frameworks focus on ensuring a corporate one council approach in respect of
Policy, Governance, Performance, Self-Evaluation, Project
Management, and Demonstrating Improved Outcomes for
Communities.   
1.3 The Strategic Performance Framework comprises performance
measurement at three levels (as per the diagram on the right).  This
aims to collectively provide an overview of performance to help
Executive Summary
The purpose of this report is to highlight the 2022/23 year end performance and the
2023/24 year to date performance of the Place Service in relation to the performance
indicators detailed at Appendix 1 for economic regeneration and growth. 
Recommendations
It is recommended that the Enterprise and Fair Work Committee: 
(1) Review the high-level performance overview presented in Appendix 1, and the
supporting data contained within the linked Excel spreadsheet, and identify where
further information is required to understand or investigate performance further. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Item 10
Page 265 of 312

Page 266

understand the impact of council activities on improving services and outcomes for the
people and communities of North Lanarkshire.  The measures in this Framework allow
for day to day activities, and progress towards achieving the long-term vision set out in
The Plan for North Lanarkshire, to be regularly monitored, reported, assessed, and
scrutinised.   
1.4 The Strategic Performance Framework is aligned to the Accounts Commission
statutory direction which places a requirement on councils to report a range of
information in terms of (1) improving local services and outcomes, and (2)
demonstrating Best Value.  Key points of note in this respect are that the Accounts
Commission also expect to see: 
(a) A balance in reporting areas of improvement that have been achieved and not
achieved.
(b) Reporting that is undertaken in a timely manner.
(c) Easy access to performance information for all citizens and communities. 
1.5 A Performance Reporting Schedule supports the timely submission of a range of
performance information that facilitates Elected Members and senior management to
undertake regular performance reviews that inform scrutiny, challenge, and decision
making processes.  This Schedule, endorsed by the Audit and Scrutiny Panel in
February 2023, includes Chief Officer’s individual six monthly Performance Reviews at
Service Committees in line with the Strategic Performance Framework. 
1.6 This report therefore presents the Enterprise and Fair Work Committee with the latest
performance results for Place for Members’ further review and scrutiny. 
2. Strategic Performance Framework 
Enterprise and Fair Work Committee responsibilities 
2.1 In line with the terms of reference outlined in the Scheme of Administration, the
Enterprise and Fair Work Committee is responsible for monitoring and reviewing
performance information for the following Ambition Statements from The Plan for North
Lanarkshire: 
1. Ensure a housing mix that supports social inclusion and economic growth. 
2. Refocus our town centres and communities to be multi-functional connected
places which maximise social, economic, and environmental opportunities.
3. Maximise the use of our marketable land and assets through improved
development in business and industrial infrastructure.
4. Market and promote North Lanarkshire as the place to live, learn, work, invest,
and visit.
5. Grow and improve the sustainability and diversity of North Lanarkshire’s
economy. 
2.2 The high-level performance overview in Appendix 1 presents Members with a summary
of the latest results for each performance indicator within the remit of the Chief Officer
(Place). 
Page 266 of 312

Page 267

2.3 The information in Appendix 1 comprises the following: 
• An ideal direction arrow - this indicates whether a higher or lower figure is the
preferred direction of travel.   
• Measurement unit - for example whether the result is a %, a number, a unit cost
(in £), or a ratio.
• Performance results for the last five financial years (depending on availability of
data) along with the latest year’s target and corresponding RAG status (for
indicators where it is appropriate to set targets).   
• The most recent monthly or quarterly results, along with the corresponding target
and RAG status.  Note the inclusion of this information is dependent on the
measurement frequency of the indicator and availability of data as at the time of
reporting. 
• A trend graph - this captures the direction of travel achieved over the five financial
years and includes the most recent monthly or quarterly results where available.
• Comments - narrative summarising the current position and providing an
explanation for any significant variations in performance.  Where applicable, this
narrative also highlights the effect of the pandemic on service delivery, e.g. any
increase or decrease in the volume of transactions or enquiries processed. 
2.4 A large volume of data supports the high-level performance overview in Appendix 1. 
This is outlined in the latest performance results for Place - economic regeneration
and growth Excel spreadsheet which is available through the following link for
Members to carry out a deep dive and review and scrutinise each performance indicator
further.  The Menu on the second tab of the spreadsheet contains built in hyperlinks
that automatically take the user to a tab for each performance indicator and therefore
provides a useful navigation aid to review the contents of the file.
• Latest performance results for Place - economic regeneration and growth.xlsx 
Current context 
2.5 Despite on-going economic challenges, including inflationary and labour market
pressures, North Lanarkshire’s economy is continuing to grow and attract new inward
investment and job growth.  The gross weekly pay for North Lanarkshire’s residents is
now higher than the average earnings for both Scotland and the UK for the first time
ever and North Lanarkshire has attracted over £100m of international investment over
the last two years, more than any other local authority in Scotland. 
The council, through the implementation of its Economic Regeneration Delivery Plan
and range of business support and employability activities continued to proactively
support sustainable growth to help improve economic outcomes for its residents. 
Recent Performance highlights 
2.6 Despite the challenging economic climate, the council and Business Gateway
supported 492 new businesses in 2022/23, which was slightly below the target of 500. 
In terms of number of new businesses supported per 10,000 population North
Lanarkshire is on par with the national average and family group.  
 A higher figure is better
 A lower figure is better
Key to RAG status
Green Performance is on target and/or within acceptable thresholds
Red Performance does not meet target and is outwith acceptable thresholds
Blue Performance surpasses the target and exceeds expectations
Page 267 of 312

Page 268

The Economic Regeneration Delivery Plan (ERDP) seeks to co-ordinate and maximise
the economic impact of the council’s place-based investment in housing, town centres,
infrastructure and industrial developments.  In addition to the direct benefits that these
programmes bring to local communities and the wider economy, the council’s
investment also provides construction employment opportunities. As at the end of
2022/23, 1,445 construction jobs had been created as a result of ERDP related
investment across North Lanarkshire by the council and the council's arms length
external organisations.  In addition 7.7 ha of vacant and derelict land has been
remediated and 13.46 kilometres of new or enhanced active travel routes which link
communities, arterial routes and transport hubs with town centres and key business
have been created since 2019. 
Areas of performance requiring improvement 
2.7 Town vacancy rates remains higher than the national and family group averages. 
However, this is a short-term measure that can only be impacted upon by long-term
activities and the council already has in place a large-scale transformation programme
for North Lanarkshire’s town centres, including, for example, ambitious plans to re-
develop Cumbernauld town centre.  The most recent update in this respect was
reported through the ERDP performance framework annual progress report in
September 2023.  The ERDP aims to create vibrant mixed-use towns where people
live, work, shop, eat, and access local services. As such, recognition needs to be given
to the fact that vacancies may temporarily increase where vacant possession of
redundant retail centres or land assembly is required to enable transformative change. 
Next steps 
2.8 As noted in paragraph 1.5, the Strategic Performance Framework is supported by a
Performance Reporting Schedule.  This sets out the arrangements for service,
statutory, and Strategic Performance Framework reporting to committee.  In this
respect the relevant Committee can expect to receive the following in respect of Place
areas of work during 2023/24. 
Report Description Committee Committee
cycle
Planning
performance
framework 
This report updates on the Scottish
Government’s feedback on the
performance of the planning and place
service for the latest year based on the
Planning Performance Framework (PPF)
submitted each year.
Planning
Committee
Cycle 4 in
2023
Economic
Regeneration
Delivery Plan
(ERDP)
Performance
Framework 
The ERDP Performance Framework was
approved by Committee in February 2021.
This comprises a group of performance
indicators at three levels. These indicators
aim to collectively provide an overview of
how the North Lanarkshire economy is
performing as well as help to understand
the impact that the delivery of the ERDP
is having on improving economic
opportunities and outcomes for all.
• Latest report in September 2023:
https://mars.northlanarkshire.gov.uk/egenda/imag
es/att101194.pdf 
Enterprise
and Fair
Work
Committee
Cycle 3 in
2023
Fusion Assets  Fusion Assets is a wholly owned
subsidiary of the council. It focuses on
Enterprise
and Fair
Cycles 2 and
4 in 2023
Page 268 of 312

Page 269

delivering physical economic regeneration
projects across North Lanarkshire and in
particular industrial development - a
market where there is currently limited
speculative development. Unlike more
traditional council owned property
companies, Fusion Assets is more similar
to an urban regeneration company whose
role is focused on the redevelopment of
vacant and derelict land and brownfield
sites rather than commercial property
management.
• Latest report in May 2023:
https://mars.northlanarkshire.gov.uk/egenda/imag
es/att100591.pdf 
Work
Committee
New supply
programme
update on
progress
This report aims to provide an update
regarding progress with the delivery of the
new supply programme which aims to
deliver 5,000 new homes by 2035.
Housing
Committee
Cycle 4 in
2023 
2.9  Development work is underway to further enhance recording, monitoring, and
reporting of the extent of the council’s business support and engagement; new
indicators in this respect will be introduced into Strategic Performance Framework
reporting for 2024/25. 
3. Measures of success 
3.1  Measures of success include:
• Regular oversight and monitoring of performance across the organisation to gain
assurances in terms of governance and accountability.
• Regular review and challenge processes to scrutinise the performance of the
council to ensure effective use of resources and that resources are directed in
accordance with agreed policy and according to priorities, while ensuring sound
decision making and clear accountability for the use of resources in achieving
improved outcomes for service users and the local community.  
• Performance monitoring, management, and reporting arrangements that support
the demonstration of improved performance in local services and outcomes, and
the delivery of Best Value. 
4. Supporting documentation 
4.1 Appendix 1 -  High-level performance overview 
Pamela Humphries
Chief Officer (Place) 
Page 269 of 312

Page 270

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 270 of 312

Page 271

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Managing and monitoring service performance supports the ongoing monitoring of
the service’s risk register.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐  
Page 271 of 312

Page 272

Appendix 1
Place
High-level performance overview - as at September 2023
Note, the figures for vacant and derelict land, kilometres of active travel routes, and estimated jobs created are cumulative and therefore the 2022/23 figures in the table below
refer to the period from 2019/20 to 2022/23. 
Page 272 of 312

Page 273

Page 273 of 312

Page 274

Page 274 of 312

Page 275

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref  JO’N/PK Date 17/11/23 
Routes to Work Ltd – Performance & Finance Report   
From  Janie O’Neill, Chief Officer (Education -South)  
E-mail oneillja@northlan.gov.uk Telephone   07790 894444 
Executive Summary 
Routes to Work Ltd.’s performance was previously considered by the former ALEOs and
External Bodies Monitoring Sub Committee.  Following changes to North Lanarkshire
Council’s Scheme of Administration, responsibility for oversight of service delivery by arm’s
length bodies now rests with the relevant service committee. The functions delivered by
Routes to Work on behalf of the Council fall within the Terms of Reference of the Enterprise
and Fair Work Committee and a performance report is submitted in line with the Strategic
Performance Framework considered by members in November 2019.  This report outlines
Routes to Work Ltd.’s performance against its charitable objectives and Council priorities
for Q4 2022/23 to Q1 2023/24.  This report also provides commentary in respect of the
charity’s governance arrangements to provide assurance that Council obligations are being
satisfied.  The financial performance of Routes to Work Ltd. for Q4 2022/23 to Q1 2023/24
and overall financial standing is also included within this report.   Future reports will be
submitted on a 6 monthly basis to committee. 
Recommendations
It is recommended that Committee: 
1) Note Routes to Work operational performance and finance for Q4 2022/23 to Q1
2023/24, along with wider achievements during that period. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement
(11) Increase economic opportunities for adults by understanding,
identifying, and addressing the causes of poverty and deprivation
and barriers to financial inclusion
Programme of Work Brighter Futures 
Item 11
Page 275 of 312

Page 276

1. Background 
1.1 Routes to Work, established in 2002, is a company limited by guarantee with charitable
status which is owned by North Lanarkshire Council.  The organisation provides a range
of free employability services to North Lanarkshire residents and specialises in
providing case worker support to unemployed residents as well as support with
accessing vocational training and the short-term costs associated with moving from
benefits to employment, such as childcare and travel.  They also provide in-work
support for up to 6 months for those participants that require it.     
1.2 In 2017 the company amended its Memorandum and Articles of Association to extend
its area of operation into other local authority areas thereby enabling Routes to Work
to bid to deliver national employability programmes in these areas. This is intended to
support the long-term sustainability of the company.  While joint delivery of the Council’s
EU funded and Shared Prosperity Fund programme has been and is currently the major
source of income for Routes to Work, in the past the organisation has delivered a wide
range of other programmes on behalf of the Council or in conjunction with the Council’s
Employability team.   
1.3 Routes to Work’s Board of Directors currently consists of up to ten members – two are
Category A members appointed by North Lanarkshire Council (one an elected member,
and one a senior Council officer) and up to eight Category B directors, who bring
specialist expertise to the company and are selected through a formal nominations
procedure. The Board currently has independent directors with interests and/or
experience in local community development and engagement, lifelong learning and
skills, business development and support, HR and Law. The Board of Directors has
responsibility for ensuring that Routes to Work’s services are delivered in accordance
with approved Service Level Agreements and charitable objectives and meets quarterly
to fulfil these duties.  Council funded activities delivered by Routes to Work are also
aligned to The Plan for North Lanarkshire and Council Programme of Work areas.   
1.4 Finally, Routes to Work were comprehensively reviewed in 2019 with the outcomes
from the review considered by the Policy and Strategy Committee at its meeting in
September 2019, where it was noted that the charity is performing well and delivering
on its key objectives.  The options appraisal confirmed that retaining Routes to Work
as an arm’s length provider remained the best option for the council.  In addition to
contractual performance monitoring by this committee, the Audit and Scrutiny Panel is
responsible for ensuring the effectiveness of each entity’s governance arrangements,
including financial governance. The Policy and Strategy Committee retains
responsibility for considering the outputs from reviews by the council into its arm’s
length delivery arrangements, including recommendations in relation to Best Value and
potential future delivery options. 
2. Report 
Operational Performance Q4 2022/23 to Q1 2023/24
2.1 The operational performance overview for employability initiatives delivered by Routes
to Work in the reporting period are attached at Appendix 1.  The following points are
service delivery highlights which are not included within the performance measures. 
Page 276 of 312

Page 277

Service Delivery Highlights 
2.2  Knowledge Transfer Partnership (KTP) – Social Value Framework 
Routes to Work completed a key output of the Knowledge Transfer Partnership, a
Social Value Evaluation forecast report; this report outlines, in academic terms, the
social value benefits of Routes to Work’s employability support activities. Once the
report was concluded it was submitted to Social Value UK and secured that body’s
quality assurance award.  This work is now being built upon to embed social value
throughout the organisation’s decisions, culture and services. With this progress and
the organisational membership of Social Value UK, Routes to Work can better
understand and improve their services to enable the most impactful employability
interventions. 
Within the report, the comprehensive SROI (Social Return on Investment) calculations,
guided by the principles of Social Value International, demonstrates the impact that
their programmes and services create and tells a story of empowerment, equity, and
evolution. A key outcome of the work is the monetary value calculated on social value
investment at Routes to Work Ltd.   This shows that every pound invested in Routes to
Work results in £6.89 worth of social value across other services. This ratio underlines
the significance of their contribution to the lives of their clients, stakeholders, and the
broader community. 
2.3 New Programmes 
During the reporting period the company designed and implemented the Coatbridge
Community Engagement Project which is funded from the UK Shared Prosperity Fund
utilising the learnings from the Community Renewal Fund pilot which ended in
December 2022. The project began in January 2023 and delivered a place-based
engagement service to people who are unemployed or economically inactive who
reside in Ward 7 – Coatbridge North. The project supported the local community
through piloting a new approach of concentrated and intense engagement, pre-
employability and personal development activities, on their doorstep. The project
demonstrated innovative practice and was aligned with the ‘people and skills’
investment priority. The project will continue to March 2025 and intends on engaging
with a further three local communities in North Lanarkshire.
2.4 Activities with Schools
Routes to Work Ltd continues to support in the delivery of an alternative Curriculum
Pathways to North Lanarkshire secondary and ASN schools. During Q1 of 2023/24 we
have been engaging with several schools to discuss delivery for the new academic year
with six schools confirmed for delivery in the current academic year, across 8 different
types of interventions and others considering specific proposals that were requested. 
In addition to this, Routes to Work will also be delivering a 4-week cluster approach
Future Friday Enrichment programme which all 23 secondary schools in North
Lanarkshire will have access to.  In the reporting period Routes to Work also delivered
five Construction Routeways courses to 28 school pupils who were undertaking their
Foundation Apprenticeship.
2.5 NHS Demonstrator Programme 
Further to the success of the first pilot in 2022/23 the organisation have once again
worked in partnership with NHS Lanarkshire and North Lanarkshire Council
Page 277 of 312

Page 278

Employability Team to provide an opportunity for unemployed parents and parents on
low incomes to access a 6 month paid work placement within various NHS roles. 
Initially it was agreed that 20 paid placements would be made available however due
to the success of the first programme and the volume of interest that up to 26
placements would be offered. There are currently 17 parents who been offered
opportunities to commence in October 2023 with a further round of interviews taking
place to fill the remaining placements.
2.6 Strategic Growth
The appointment of a Strategic Growth Manager in the latter part of 2022 was the
starting point for progressing RTW’s growth ambitions as outlined in their Business Plan
2021-2024 and their Knowledge Transfer Partnership (KTP). In the period, the following
strategic growth priorities were identified: 
• Positive Destinations – for young people, improve levels of positive destinations
and those sustaining those positive destinations
• KTP & Enterprise – Use the evidential base to demonstrate RTW’s impact on
clients, the economy and communities and consider how RTW and support Social
Enterprise Frameworks
• Procurement & Commissioning – Securing opportunities outwith North Lanarkshire
to  meet Regional and National priorities
• National funding streams – Raising the profile of RTW, highlighting success and
evaluate new models of funding
• Child Poverty – Delivery of new parental employability projects in early education
settings and integration of funding streams
• Place based Approach – Meeting the ongoing challenges of engagement with
hardest to reach clients replicating effectiveness of the Airdrie Central Community
Engagement Project
• Upskilling and In-work progression – Respond to ongoing challenges in relation to
unemployment post covid and economic & labour market changes 
• Focused delivery – strategic approach to targeted groups via statutory services
such as Housing, Justice & Health. 
Financial Performance Q4 2022/23 to Q1 2023/24 
Public Accountability Obligations 
2.7 To satisfy the Council’s duty to ensure the organisation delivering employment and
training services on its behalf is financially sound, the Council’s Section 95 Officer
maintains appropriate and proportionate processes and procedures for scrutinising
Routes to Work’s financial performance. 
2.8 The Council’s Legal Agreements with Routes to Work specify the financial information
which must be submitted to the Council including an annual business plan, quarterly
management accounts, audited financial statements etc. to enable Financial Solutions
to assess and report any financial risk likely to arise as a result of the Council using
Routes to Work to deliver these services. 
2.9 The Council expends revenue resources annually with Routes to Work to deliver
services which assist the Council in achieving its priority outcomes therefore has a duty
to ensure this money is being properly used to deliver both the Council’s and Routes
to Work objectives. 
Page 278 of 312

Page 279

2.10 Financial Outturn to 31st March 2023
The 2022/23 Annual Accounts approved by the Board at the AGM on 21 September
2023 reported a Net Movement in Funds of £1.561m, which included a significant uplift
in the annual valuation of FRS102 pension costs of £1.686m.  Therefore, the
operational Net Movement in Funds was a deficit of £0.125m resulting in a further
drawdown from reserves of £0.014m against budget. Further details on the Financial
Outturn to 31 March 2023 is outlined in Appendix 2. 
2.11 Balance Sheet at 31st March 2023
Key balances are set out in Appendix 3 to provide members with an update on the
overall financial standing of the company, as at 30 June 2023, along with the
comparator figures as at 31 March 2023. Council representatives are asked to note: 
• The company has net assets, excluding pension fund assets, of £0.927m. 
Therefore, Members can be assured that the company has sufficient resources to
meet its current obligations.
2.12 Forecast Financial Performance to 31 March 2024
For financial year 2023/24, income approved from the Council is £1.698m which
represents 36% of the organisations total budgeted income of £4.774m.  The balance
of income of £3.076m will primarily be generated from the UK Shared Prosperity
Fund.  The outturn to 31 March 2024 is projected to be on budget at an operational
deficit of £0.065m. A detailed comparison of projected outturn to the 2023/24 Budget
are provided in Appendix 4.
2.13 Balance Sheet at 30 June 2023
Key balances are set out in Appendix 5 to provide members with an update on the
overall financial standing of the company, as at 30 June 2023, along with the
comparator figures as at 31 March 2023. Council representatives are asked to note:
• The company has net assets, excluding pension fund assets, of £0.956m which is
a £0.028m favourable movement on the 31 March position.  This is predominantly
due to favourable movements in cash and prepayments partially offset by
increased creditors.  Therefore, members can continue to have assurance in the
company’s resources.  
2.14 Projected Cash flow to 31st March 2024
The cashflow for the year projected at 30th June 2023 to 31st March 2024 is attached
per Appendix 6. Cash balances vary from a high of £1.164m to a low of £0.351m
throughout the year. 
3. Measures of success 
3.1 Routes to Work Ltd. continue to provide an effective employability service on behalf of
the Council to support unemployed and underemployed residents of North Lanarkshire. 
Page 279 of 312

Page 280

4. Supporting documentation 
4.1 Appendix 1 Routes to Work – Q4 2022/23 to Q1 2023/24 Operational Performance 
4.2 Appendices 2 - 6 Routes to Work – Q4 2022/23 to Q1 2023/24 Financial Performance 
Janie O’Neill
Chief Officer for Education (South) 
Page 280 of 312

Page 281

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty   
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
The financial performance of Routes to Work is closely monitored by the council’s
Section 95 Officer and the financial performance as detailed above, along with
other key financial information presented in the report. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Page 281 of 312

Page 282

Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Routes to Work maintain a detailed risk register which is presented to each Board
meeting.  In terms of the Council, the risk of Routes to Work and the wider
employability programmes being deemed non-compliant with external funders is
present. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
Within all Council employability programmes veterans are immediately eligible for
support alongside other priority groups. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC).
Page 282 of 312

Page 283

If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒
Page 283 of 312

Page 284

APPENDIX 1 
Routes to Work – 2022/23 Q4 Operational Performance 
Employability
Programme
Indicator Target
Outcome/Purpose
2022/23
Q4 Target
2022/23
Q4 Actual
Blue
Red
Amber
Green
Comments
North Lanarkshire’s
Working
Employability
Pipeline (European
Social Fund)
The number of
job entries
Job entries secured 197 160 R This is the Council’s main EU funded
employability programme which from September
2018 became an all-age programme. This
programme also supports the Education and
Families Pathways Programme to September
2022.
Sustainment in
Employment
In work 26 weeks
after starting
employment
70% 75% B
Employability Fund
(Skills Development
Scotland
Qualifications Accredited
qualification
12 5 R The contract was awarded by SDS for coverage
across 2 Local Authority areas. Most Training
Providers closed their operations for many
months due to Covid, therefore training was
extremely limited, this affected the full delivery of
the contract.
Job Starts Entered employment
– 4 weeks
9 13 B
Sustainment Sustained in work at
26 weeks
10 27 B
No one Left Behind
(NOLB)
Number of
starts
Engaged on
programme
39 28 R This funding from Scottish Government. Delivery
is available to enhance support to specific
groups and this service is for people aged 50+,
the BAME community and people a mental
health issue.
Number of Job
Entries
Job Entries secured 17 7 R
26-week
sustainment
Jobs sustained at 26
weeks
76% 80% B
Parental
Employment Support
Fund
Number of
starts
Engaged on
programme
20 29 B Funding from the Scottish Government to
support employed and underemployed parents
who may be at risk of poverty. Number of Job
Entries
Job Entries secured 15 19 B
26-week
sustainment
Jobs sustained at 26
weeks
70% 74% B
Achieved
qualification
Accredited
qualification
14 24 B Funding from the Scottish Government to
protect young people aged 16 -24 years from
Page 284 of 312

Page 285

Young Persons
Guarantee
Programme (YPG)
Entered
FE/HE/Training
Moved into full time
education or training
programme
3 10 B the economic impact of COVID -19 by offering
them the opportunity of a job, apprenticeship,
further or higher education, training programme
or volunteering. Targeting particularly excluded
groups of 16-24 yr olds. This programme also
supports the Education and Families Pathways
Programme from October 2022.
Job entries
(including
MA’s)
Job entries secured 26 50 B
Commenced
Volunteering 
Moved onto a
volunteering
programme
3 2 R
Sustainment Post destination
sustained at 26 weeks
70% 76% B
Community Renewal
Fund
Registration Engaged on
programme
66 60 R Funding from the UK Government to help local
areas prepare for the introduction of the UK
Shared Prosperity Fund. The aim was to support
project proposals that align with long-term
strategic plans for local growth, target people
most in need and support community renewal. 
Achieved
Qualification
Accredited
qualification
18 15 R
Entered
FE/HE/Training
Moved into full time
education or training
programme
6 3 R
Job Searching Engaged in job
searching activities
18 12 R
Life Skills Improved life skills  20 18 R
Job Entries Job entries secured 12 13 B
Tailored Training
Solutions (NOLB
Grant Funding
Programme)
Registration Engaged on
programme
42 42 G Funded from Scottish Government the North
Lanarkshire Employability Grant Programme
aims to support unemployed people to move
towards and into work. It is a new initiative which
recognises that to help local people to develop
the skills and confidence employers are looking
for we all need to work together at a local level
to provide the best possible services to those
who need them most
Qualifications Accredited
qualification
12 10 R
Job Starts Entered employment
– 4 weeks
20 1 R 
Page 285 of 312

Page 286

Routes to Work – 2023/24 Q1 Operational Performance
Employability
Programme
Indicator Target
Outcome/Purpose
2023/24
Q1 Target
2023/24
Q1 Actual
Blue
Red
Amber
Green
Comments
North Lanarkshire’s
Working
Employability
Pipeline (European
Social Fund)
The number of
job entries
Job entries secured 195 210 B This is the Council’s main EU funded
employability programme which from September
2018 became an all-age programme. This
programme also supports the Education and
Families Pathways Programme to September
2022.
Sustainment in
Employment
In work 26 weeks
after starting
employment
70% 73% G
No one Left Behind
(NOLB)
Number of
starts
Engaged on
programme
41  41 G This funding from Scottish Government. Delivery
is available to enhance support to specific
groups and this service is for people aged 50+,
the BAME community and people a mental
health issue.
Number of Job
Entries
Job Entries secured 17  18 B
26-week
sustainment
Jobs sustained at 26
weeks
70% 74% B
Parental
Employment Support
Fund
Number of
starts
Engaged on
programme
27 30 B Funding from the Scottish Government to
support employed and underemployed parents
who may be at risk of poverty. Number of Job
Entries
Job Entries secured 18 24 B
26-week
sustainment
Jobs sustained at 26
weeks
80% 83% G
Young Persons
Guarantee
Programme (YPG)
Achieved
qualification
Accredited
qualification
25 27 B Funding from the Scottish Government to
protect young people aged 16 -24 years from
the economic impact of COVID -19 by offering
them the opportunity of a job, apprenticeship,
further or higher education, training programme
or volunteering. Targeting particularly excluded
groups of 16-24 yr olds. This programme also
supports the Education and Families Pathways
Programme from October 2022.
Entered
FE/HE/Training
Moved into full time
education or training
programme
0 0 -
Job entries
(including
MA’s)
Job entries secured 33 40 B
Commenced
Volunteering 
Moved onto a
volunteering
programme
0 1 G
Page 286 of 312

Page 287

Sustainment Post destination
sustained at 26 weeks
70% 77% B
UK Shared
Prosperity Fund
Registration Engaged on
programme
71 47 R Funding from the UK Government to help local
areas. The aim was to support project proposals
that align with long-term strategic plans for local
growth, target people most in need and support
community renewal. 
Achieved
Qualification
Accredited
qualification
25 17 R
Entered
FE/HE/Training
Moved into full time
education or training
programme
7 12 B
Job Searching Engaged in job
searching activities
12 3 R
Life Skills Improved life skills  20 14 R
Job Entries Job entries secured 12 17 B
Tailored Training
Solutions (NOLB
Grant Funding
Programme)
Registration Engaged on
programme
8 7 A Funded from Scottish Government the North
Lanarkshire Employability Grant Programme
aims to support unemployed people to move
towards and into work. It is a new initiative which
recognises that to help local people to develop
the skills and confidence employers are looking
for we all need to work together at a local level
to provide the best possible services to those
who need them most
Qualifications Accredited
qualification
24 14 R
Job Starts Entered employment
– 4 weeks
25 15 R
Key: - 
B - Blue (above threshold) ≥5% of target 
G - Green (within threshold and on target) = to or + 5% of target 
A - Amber (within threshold but below target) 
R - Red (below threshold) ≤ 5% of target 
Page 287 of 312

Page 288

Appendix 2
Routes to Work Limited
Outturn to 31 March 2023
Income & expenditure 2022/23 2022/23 2022/23 Commentary
Revised
Annual
Budget
Outturn to
31 March
2023
Revised
Budget vrs
Outturn
£'000 £'000 £'000
Income from NLC
ESF Pipeline 2,886 2,473 413
No one left behind 188 168 20
Prospects for Parents 208 168 40
National Training Transition Fund (NTTF) 0 0
Youth Enhanced Care Worker 407 387 20
CRF 291 361 (70)
0 0 0
Total Income from NLC 3,980 3,557 423
Skills Development Scotland 14 22 (8)
DWP Kickstart 60 56 4
Development Income 12 18 (6)
Other Income 183 222 (39)
Total Incoming Resources 4,249 3,875 374 Predominantely as a result of a reduction in SLA
income in the ESF project offset by corresponding
underspends within expenditure.
Expenditure:
Charitable Activities (4,360) (4,000) (360)
Total Resources Expended (4,360) (4,000) (360) The underspend in expenditure was a result of
decreased uptake in the major ESF project against pre
pandemic levels. This was predominantly offset by a
corresponding under-recovery in income.
Operational surplus / (deficit) (111) (125) 14
Page 288 of 312

Page 289

Appendix 3
Routes to Work Limited
Overall Financial Standing - Balance Sheet as at 31st March 2023
Balances/ Indicator 31 March 2022 31 March 2023 Variance Commentary
£ £ £
Fixed Assets 4,566 560 4,006 Net Book Value of ICT equipment has reduced since 31st March 2022 due to
end of life of assets.
Current Assets:
Trade Debtors 63,087 126,793 (63,706) Debtors balance has increased due to a previous payment on demand
arrangement no longer in place
Prepayments 486,492 548,315 (61,823) Increase primarily relates to adjusted income claims to NLC at year end
Bank / Cash 870,693 507,976 362,717 Lower balance at 2023 but mostly offset by increases in debtors, prepayments
and liabilites
1,420,272 1,183,084 241,194
Current Liabilities:
Creditors inc. Advanced payments, VAT &
other taxes
(371,930) (256,224) (115,706) Reduced balance mostly relates to deferred income in 2022 from an advanced
payment for the CRF programme. This ended in 2022.
(371,930) (256,224) (115,706)
Defined scheme pensions liabilities 16,000 1,702,000 (1,686,000) FRS102 actuarial valuation
Net Asset / (Liabilities) 1,068,908 2,629,420 (1,560,512)
Financed by Reserves:-
Designated Reserves 350,380 298,951 51,429 Reduction in reserves is due to the utilisation of the following funds: Future
Development, Knowledge Transfer Partnership ,Office Dilapidations and
Strategic Growth.
Unrestricted funds 803,308 749,655 53,653
Unrestricted Pension Fund 16,000 1,702,000 (1,686,000) FRS102 actuarial valuation
Restricted Funds (100,780) (121,186) 20,406 Movement relates to a timing issue with the claims.
Total Reserves 1,068,908 2,629,420 (1,560,512)
Page 289 of 312

Page 290

Appendix 4
Routes to Work Limited
Projected Outturn  to 31 March 2024
Income & expenditure 2023/24 2023/24 Year to date 2023/24 2023/24 Commentary Variance Budget vrs Projected Outturn
Budget
Budget Actual Variance
Projected
Outturn to
31 March
2024
Variance
Budget vrs
Projected 
Outturn
£'000 £ £ £ £'000 £'000
Income from NLC
ESF Pipeline 743 743 601 (141) 743 0
No one left behind 452 58 42 (16) 452 0
Prospects for Parents 353 52 40 (12) 353 0
Youth Enhanced Care Worker 111 111 102 (9) 111 0
CRF 0 0 0 0 0 0
TTS 39 39 28 (11) 39 0
Total Income from NLC 1,698 1,003 814 (189) 1,698 0
0 0
UKSPF 2,945 94 73 (21) 2,945 0
Development Income 27 9 12 3 27 0
Other Income 104 18 19 1 104 0
Total Incoming Resources 4,774 1,124 919 (205) 4,774 0 Under recovery relates to SLA income which is matched by a decrease in
expenditure below
Expenditure:
Charitable Activities (4,839) (1,156) (891) 265 (4,839) 0 Underspend relates to budgeted pay award not yet implemented and lower
than anticipated headcount relating to benficiary costs.
Total Resources Expended (4,839) (1,156) (891) 265 (4,839) 0
Operational surplus / (deficit) (65) (32) 28 60 (65) 0
Page 290 of 312

Page 291

Appendix 5
Routes to Work Limited
Overall Financial Standing - Balance Sheet as at 30 June 2023
Balances/ Indicator 31 March 2023 30 June 2023 Variance Commentary
£ £ £
Fixed Assets 560 189 371 Net Book Value of ICT equipment has reduced since 31st March 2023 due to
end of life of assets.
Current Assets:
Trade Debtors 126,793 64,933 61,860 Balance at 30 June relates to April/May claim for UKSPF and First Bus/Tesco
vouchers held for clients
Prepayments 548,315 886,270 (337,955) Movement is a result of increased income adjustments to include Q1 claims.
Bank / Cash 507,976 947,148 (439,172) Advanced payment from UKSPF resulting in a higher cash balance with partially
offsetting inrease to current  liabilities below
1,183,084 1,898,351 (714,896)
Current Liabilities:
Creditors inc. Advanced payments, VAT &
other taxes
(256,224) (942,818) 686,594 Increase within creditors balances as a result of the UKSPF advanced payment
of £757K reflected by an increased bank/cash balance above.
(256,224) (942,818) 686,594
Defined scheme pensions liabilities 1,702,000 1,702,000 0 FRS102 actuarial valuation
Net Asset / (Liabilities) 2,629,420 2,657,722 (28,302)
Financed by Reserves:-
Designated Reserves 298,951 280,252 18,699 Reduction in reserves is due to the utilisation of the following funds: Future
Development, Knowledge Transfer Partnership ,Office Dilapidations and
Strategic Growth.
Unrestricted funds 749,655 749,903 (248)
Unrestricted Pension Fund 1,702,000 1,702,000 0 FRS102 actuarial valuation
Restricted Funds (121,186) (74,432) (46,754)
Total Reserves 2,629,420 2,657,723 (28,303)
Page 291 of 312

Page 292

Appendix 6 
Page 292 of 312

Page 293

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    PH/DG Date 17/11/23 
Fusion Assets Limited – Performance Monitoring Report to 30th 
September 2023 and Financial Performance to 30th June 2023 
From  Pamela Humphries, Chief Officer of Place
E-mail Greerd@northlan.gov.uk Telephone
David Greer, Growth
Programme Manager:
07583 059 816 
1. Background 
Executive Summary 
This report provides details of the operational performance of Fusion Assets Ltd. (Fusion
Assets) during 2023/24 (up to 30th September 2023), outlines a range of economic outputs
and outcomes being delivered through this Arms Length Organisation (ALEO) and details
key highlights achieved during 2023/24 (Q1&2) 
The report also details the financial performance of Fusion Assets up to 30th June 2023,
their overall current financial standing and future financial projections. 
Recommendations
The Enterprise and Fair Work Committee is requested to: 
1) Note the content of this report and the operational targets set for Fusion Assets during
2023/24 and performance against these to 30th September (as outlined in Appendix 1); 
2) Note the financial performance of Fusion Assets (up to 30th June 2023), their overall
current financial standing and future financial projections as detailed in 2.3 onwards; 
3) Endorse the key highlights achieved during 2023/24; and 
4) Note proposed amendments to Fusion Assets’ Articles of Association and that revisions
to these will be reported separately to Council. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (3) Maximise the use of our marketable land and assets through
improved development in business and industrial infrastructure
Programme of
Work Transforming Places
Item 12
Page 293 of 312

Page 294

1.1.  Fusion Assets is a wholly owned subsidiary of the council. It focuses on delivering
physical economic regeneration projects across North Lanarkshire and in particular
industrial development – a market where there is currently limited speculative
development. Unlike more traditional council owned property companies, Fusion
Assets is more similar to an urban regeneration company whose role is focused on the
redevelopment of vacant and derelict land and brownfield sites rather than commercial
property management. 
1.2.  It should be noted that Fusion Assets does not receive an on-going or recurring
management fee from the council for the delivery of services but rather uses grant
funding from the council’s annual Vacant & Derelict Land Fund (VDLF) allocation from
the Scottish Government as enabling investment for the acquisition and redevelopment
of vacant and derelict land sites. In taking this forward, Fusion Assets has developed a
unique and innovative development model where the value of acquired/remediated
land sites, together with other loan funding and Fusion’s reserves, is used as equity to
set up joint venture partnerships with the private sector that will fund and manage the
commercial redevelopment of sites for industrial use. Once industrial units are complete
and let/partially let, unless restricted by the terms and conditions of any grant funding,
this asset is sold to a private sector investor with returns used to pay off loan funding
and re-invested in future regeneration projects. 
1.3.  Fusion Assets’ operational and financial performance was previously considered by the
former ALEOs and External Bodies Monitoring Sub Committee. Following changes to
the council’s Scheme of Administration, responsibility for oversight of service delivery
by arm’s length bodies now rests with the relevant service committee. The functions
delivered by Fusion Assets on behalf of the council fall within the Terms of Reference
of the Enterprise and Fair Work Committee. 
1.4.  In addition to performance monitoring by service committees, the Audit and Scrutiny
Panel holds responsibility for ensuring the effectiveness of the administrative and
financial governance of all of the council’s ALEOs (including Fusion Assets) whilst the
Policy and Strategy Committee retains responsibility for considering the outputs from
reviews by the council into its arm’s length delivery arrangements, including
recommendations in relation to Best Value and potential future delivery options. 
2. Report 
2.1  Operational Performance Indicators 
2.1.1  Fusion Assets’ 2023/24 annual targets and performance indicators are shown in
Appendix 1. These indicators have been developed to show this company’s
contribution to North Lanarkshire’s wider economy as well as the council’s strategic
priorities. 
2.1.2  Appendix 1 also details the external funding leverage secured by this company in
relation to completed industrial developments. 
2.2  Financial Performance 1 April 2022 to 31 March 2023 
2.2.1  The company’s draft audited annual accounts to 31 March 2023 reports a projected net
deficit of £0.012m. In respect of the underlying operational performance, this was a net
deficit of £0.156m, which is an adverse variance of £0.021m on a net operating
expenditure budget of £0.135m. Accounting adjustments resulted in a favourable
Page 294 of 312

Page 295

movement £0.144m, primarily due to impacts of updated land valuations. A summary
is provided at Appendix 2 along with previous year comparator outturn position.   
2.3  Overall Financial Standing as of 30th June 2023 
2.3.1  Appendix 3 gives an update on the overall financial standing of the company as of 30th
June 2023, together with further information and previous year’s comparator figures
which shows that the company at this point had cumulative net assets of £4.864m
predominately as a result of investments, work in progress and cash balances offset by
deferred income. 
2.4 Financial Performance 1 April 2023 to 30 June 2023 
2.4.1 The company has approved a 2023/24 operating budget with projected net operating
cost of £0.229m. This results in an increase on the utilisation of reserves of £0.094m
from 2022/23 and is mainly the result of increased costs in relation to professional
services (these have risen significantly post covid) and the creation of a distinct project
management budget.  For 2023/24 the company has also been successful in securing
a VDLF grant via the Council of £1.841m. 
2.4.2  Based on their financial statements to 30th June 2023, Fusion Assets is currently
projecting a small surplus on the operational budget of £0.003m.  A summary of the
2023/24 financial performance is provided at Appendix 4 along with previous year
comparator outturn position. 
2.4  Capital Development Expenditure/Projection as of 30th June 2023 
2.4.1  Reflecting the long-term regeneration and project-based nature of Fusion Assets, the
company’s project (capital) development expenditure is monitored cumulatively with
spend on all projects fully tracked back to each project’s inception. The summary
financial position of the projects is outlined in table 1 below. 
Table 1 – Capital Development Expenditure, Income & Projection 
Budget (£) Actual (£) Projection (£) Variance –
Budget v
Projection (£)
Expenditure (VDLF
& Non VDLF)
(23,401,430) (19,249,670) (23,613,631) (212,202)
Income (VDLF &
Non VDLF)
26,538,598 18,777,524 27,189,474 650,876
Net (Cost)/Surplus 3,137,168 (472,147) 3,575,843 438,674 
2.4.2 As outlined above, cumulative expenditure of £23.401m has been approved by Fusion
Asset’s board, which will be met from budgeted income of £26.539m; a combination of
VDLF grant, Regeneration Capital Grant Fund (RCGF) funding, anticipated capital
receipts and Fusion Assets’ own resources. An overall surplus of £3.576m is currently
projected, which is a decrease of £1.307m from what was previously reported in April
2023. These are estimates reflecting current valuations of land transfers and receipts
from onward sales, which may fluctuate, impacting the surplus projected. 
2.4.3  As of 30 June 2023, net deficits of £0.472m are reported (due to timing of VDLF grant
receipts), with a projected £4.364m of expenditure to be incurred on pre-development
and building works. Further receipts of £8.412m are still anticipated, mainly from the
onward sale of developments and VDLF funding. 
Page 295 of 312

Page 296

2.4.4  However, it should also be noted that the total investment required for the development
of the current portfolio of land owned by Fusion/Fusion Joint Ventures is in the order of
£54m, which predominantly rests with the joint venture companies and excludes some
£13.5m of pre-development works funded through VDLF grants. Fusion Assets’ share
of total development costs will be in the order of £9m and will consist of a mixture of
land, cash contributions and recycled receipts. 
2.5  Cash Flow Forecast to March 2025 
2.5.1 Fusion Assets requires effective cash management to support its development
programme and therefore the cash position is closely monitored. The cash balance as
at 30th June 2023 totalled £3.807m. The cash flow forecast to March 2025 is illustrated
within Appendix 5. Based on estimated expenditure and receipts, the forecast
demonstrates that there is sufficient funding available to carry out the proposed
development programme. The lowest cash balance is forecast at £2.484m in March
2025, with the balance reaching a high of £3.807m in June 2023. 
2.6  Key Achievements & Highlights 2023/24 (Q1&2) 
2.6.1    Between 2020 and 2022, Gartcosh Estates LLP (a joint venture between Fusion Assets
and J Smart & Co.) completed the construction of three industrial units (totalling 60,000
sqft in size) which formed the first phase at Gartcosh Business Interchange. All three
units have now been let. This will allow the investment sale of these units to proceed in
early 2024 and in turn the second phase of development to be taken forward at
Gartcosh. 
2.6.2  Fusion Assets have now completed the acquisition of Plot 1 within the employment
zone at Ravenscraig land with contractors now on site to undertake enabling works.
This will allow the future development of this 2.5ha site and represents the first
development works to proceed as part of the wider regeneration of the large-scale
business site. 
2.6.3 Fusion Assets are currently in the process of constructing a net zero enabled
commercial unit at Link Park which is scheduled for completion at the end of November
2023. The 16,000 sqft unit is being built on a speculative basis but is attracting interest
from a number of potential occupiers, prior to construction being completed. 
2.7  Revisions to Articles of Association 
2.7.1  As the incorporation governance document, Fusion Assets’ Articles of Association
outline the purpose of the company, the rights and responsibilities of its members and
directors and the way in which the company must operate as a whole. 
2.7.2 The existing Articles of Association were approved in June 2008 when, following the
withdrawal of Scottish Enterprise Lanarkshire, Fusion Assets was restructured as a
wholly owned subsidiary company of North Lanarkshire Council with responsibility for
promoting industrial and commercial regeneration and encouraging economic
development in areas of established market failure where there is little speculative
development by the private sector. 
2.7.3 A separate report is being submitted to Council to seek amendment of the Articles of
Association in order to address the limitations imposed by the current quorum clause
within the Articles. 
Page 296 of 312

Page 297

3  Measures of success 
3.1 Fusion Assets’ measures of success are reflected in the level of physical
regeneration works which they deliver together with economic outcomes achieved
from investment made. For 2023/24 this includes: 
• the investment sale of the units at Gartcosh Business Park;
• the completion of initial enabling works at Plot 1 Ravenscraig Industrial Park
(2.5 ha) to allow its future redevelopment for industrial use; 
• the completion of the second planned industrial unit at Plot A1, Link Park
(Newhouse Industrial Estate); and 
• the completion of enabling works at Condor Park to allow its future
redevelopment for industrial use.     
4 Supporting documentation 
4.1 Appendix 1: Fusion Assets Ltd - 2023/24 Operational Performance Measures,
Targets and Outcomes 
4.2 Appendix 2: Fusion Assets Ltd - Financial Performance as at 31st March 2023
4.3 Appendix 3: Fusion Assets Ltd - Overall Financial Standing as at 30 June 2023
4.4 Appendix 2: Fusion Assets Ltd - Financial Performance as at 31st March 2023
4.5 Appendix 5: Fusion Assets Ltd - Cashflow Forecast up to 31st March 2025 
Pamela Humphries 
Chief Officer (Place) 
Page 297 of 312

Page 298

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Promoting inclusive growth sits at the heart of the council’s Ambition Programme.
Fusion Assets will contribute towards this goal through the delivery of activity that
supports the council to meet its Fairer Scotland Duty and address socio-economic
disadvantage by promoting and enabling investment that will create and improve
access to new and better employment opportunity; and 
Fusion Assets also aim to ensure that any potential adverse equalities impacts as a
result of policy and/or plans developed are minimised or negated where possible. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Fusion Assets does not receive an on-going or recurring management fee from the
council for the delivery of services but rather uses grant funding from the council’s
Vacant & Derelict Land Fund (VDLF) allocation as enabling investment for the
acquisition and redevelopment of vacant and derelict land sites. 
The council awarded Fusion Assets £1.938M through the 2022/23 VDLF
Programme and £1.841M from its 2023/24 Programme for a variety of industrial
development projects. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐
Page 298 of 312

Page 299

If Yes, please provide a brief summary of the impact? 
Legal and Democratic Services provide Fusion Assets with third party Vacant &
Derelict Land Fund grant agreements and have supported the revision and
update of the companies’ Articles of Association. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Fusion Assets’ risk register review has been uploaded to the council’s Fig Tree Risk
Register and is reviewed annually. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)?
Page 299 of 312

Page 300

Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 300 of 312

Page 301

Appendix 1
Fusion Assets Ltd - 2023/24 Operational Performance Measures, Targets and Outcomes 
Area of Activity  Performance
Indicator 
2023/24 
Target
Outcome 
Outcome
Achieved  
Comments  Cumulative
Total 
(Since 2011) 
Improve economic opportunities and
outcomes 
Support development of
strategic investment sites,
Enterprise Areas and
Industrial arks 
Number of
infrastructure
works to
support
strategic
industrial
sites 
3 2  The infrastructure works at Link Park Plot A1 (building 2/3)
are due to be completed in December 2023 and building 2
is currently under construction  
Contract works are currently on site at Ravencraig Plot 1
and due to be finished by the end of December 2023. 
Works at Condor Park, Eurocentral, are due to start on
site in January 2024
10  
Area of Activity  Performance
Indicator 
2023/24 Businesses Accommodated by site as at
30 Sept 2023 
Comments  Cumulative
Total 
(Since 2011) 
Support businesses in
expansion and
development 
Number of
new gross
businesses
re-located 
T
A
R
G
E
T 
Dundyvan
Enterprise
Park 
N/A 
A
C
T
U
A
L 
Dundyvan
Enterprise
Park 
N/A  Dundyvan was sold in early 2018
and Western Campus in October
2019. Businesses accommodated at
these sites have not been counted
from after the date of sale. 
Link Park : The 47,500sqft building
for Co-Op on Plot A2 is complete.
Building 1 on Plot A1 is fully let and 
building 2 is expected to be
completed by December 2023  
Gartcosh – all three units in Phase
1 are now let. 
13 
Western
Campus 
N/A  Western
Campus 
N/A  12 
Drumpellier  N/A  Drumpellier  N/A  4
Link Park  1  Link Park  1 4
Gartcosh
(Phase 1) 
2 Gartcosh
(Phase
1) 
2  3
Total Number of businesses accommodated when properties under ownership of Fusion Assets/Fusion Assets JV.  36
Page 301 of 312

Page 302

Area of Activity  Performance
Indicator 
2023/24 Number of Gross Jobs Created by Site
as at 30 September 2023 
Comments  Cumulative
Total 
(Since 2011) 
Enhance the number of
direct, indirect and
induced jobs 
Number of
new direct
gross jobs
created
(FTE) 
TARGETS  ACTUAL     
Dundyvan
Enterprise Park 
N/A  Dundyvan
Enterprise Park 
N/A  Dundyvan sold in 2018 and Western
Campus in 2019. Jobs created since
date of sale have not been included. 
Drumpellier fully let prior to 1st April
2023 
Co-Op still to take occupation of A2
building, Building 2 on Plot A1 still to
complete.
119
Western
Campus 
N/A  Western Campus  N/A  166
Drumpellier  N/A  Drumpellier  N/A  53  
Link Park (A2) 
Building 2 (A1)  
50 
20
Link Park  0 
0 
63  
Gartcosh
(Phase 1) 
55 Gartcosh  Phase 1
(Buildings 2 & 3 )
60  85
Total Number of gross jobs created when properties under ownership of Fusion Assets/Fusion Assets JV.  486 
Area of Activity  Performance
Indicator 
2023/24 
Target
Outcome 
(ha) 
Actual Outcomes 
as at 30th September
Comments  Cumulative
Total - ha
(Since
2011) 
Improve the health and wellbeing of our
communities 
Improve brownfield and
vacant & derelict land 
Total of vacant
and derelict
land improved
(ha) 
2.55  0 New V&DL land is currently being improved at
Ravenscraig (further enabling works also taking
place at 2 existing Fusion sites – Link Park and
Condor Park)
15.8 
Page 302 of 312

Page 303

Vacant & derelict land sites
removed from register 
Total of vacant
and derelict
land taken off
register (ha) 
0 0 Previous land removed to date includes from
Dundyvan Enterprise Park, Western Campus,
Link Park (part), Drumpellier Business Park (part)
and Gartcosh Phase 1 (part). 
Remainder of Gartcosh Plot 1 to be removed from
register in 2023/24 
4.8
V&DL acquired for
commercial
development 
V&DL 
acquired (ha) 
2.55  2.55 Ravenscraig Plot 1 acquired in 2023/24  18.09 
Area of Activity  External Funding Leverage by Fusion Assets (Completed Projects)  Comments  Cumulative
Total 
(Since 2011) 
Improve North Lanarkshire’s Resource Base 
Leverage
on Council
Investment 
Project  Dundyvan  Western
Campus 
Gartcosh
Phase 1 
Drumpellier  Link Park – has been
excluded until full
development completed/
financed 
Gartcosh Phase 1: Excludes
VDLF investment made in
Phase 2, 3 and 4 as this not
currently financed. 
Total 
Total Project
Spend 
£2,985,993  £4,209,915  £5,541,621  £1,646,596  £14,384,125 
VDLF  £162,917  £748,564  £976,000  £300,000  £2,187,481 
NLC  N/A  £99,351  N/A  N/A  £99,351 
RCGF  N/A  N/A  N/A  £1,116,591  £1,116,591 
Private Sector  £387,750  £631,000  £857,000  £115,000  £1,990,750 
Fusion  £530,326  £631,000  £524,000  £115,000  £1,800,326 
Loan Finance  £1,905,000  £2,100,000  £3,184,621  N/A  £7,189,621 
Ratio of
Leverage
achieved
from NLC
investment
(inc. VDLF 
Funding) 
18:1  5:1  6:1  5:1  6:1 
Page 303 of 312

Page 304

Forecast GVA & Employment Impact of Projects Completed to Date 
Development
Name 
Construction
Spend *1 
Construction
Jobs (PYE) 
Construction
Impact – GVA (£) *2 
Employment By
2030*3 
GVA Impact By 2030 *3 
Local Economy  Value 
Dundyvan
Enterprise Park 
£2,823,000  18.8  £983,860  312 jobs  +
0.5% 
£37M 
Western Campus  £3,362,000  22.4  £1,172,259  357 jobs  +
0.7% 
£50M 
Gartcosh Industrial
Park Ph 1 (Building
1) 
£1,310,000  8.7  £455,297  175 jobs  +
0.1% 
£7M 
Gartcosh Industrial
Park Ph1 (Buildings
2 
& 3) 
£3,091,076  20.5  £1,074,318  413 jobs  +0.2%  £16M 
Enterprise House,
Drumpellier Business
Park 
£1,046,000  7.0  £366,331  65 jobs  + 0.02%  £2M 
Link Park,
Newhouse 
(Building 1) 
£1,100,000  7.3  £382,030  156 jobs  +
0.1% 
£8M 
TOTAL  £9,641,000  72.9  £4,434,095  + 1478
jobs 
+ 1.62%  £120M 
*1   Excludes site acquisition and remediation costs 
*2 Person Year Equivalent (PYE) construction impacts are reported as gross impacts and as such do not take account of displacement or leakage to the local
economy. Source: Scottish Annual Business Statistics 2019 
*3 Employment and GVA impacts take in to account direct impacts (changes in employment and GVA as a direct result of these commercial developments),
indirect impacts (impacts on supply chains) and induced impacts (household spending as a result of wages earned both via direct and indirect impacts).
The uplifts in GVA and employment figures are based on a number of assumptions around the occupancy rates and types of businesses occupying these
premises as well as macro-economic factors such as Brexit. The model on which 10 year Employment and GVA forecasts were produced was developed
before the Covid-19 global pandemic and therefore may prove optimistic. Source: NLC oxford Economics Model 2019 
Page 304 of 312

Page 305

Fusion Assets Limited Appendix 2
Financial Performance as at 31st March 2023
Income & expenditure 2021/22 Commentary
Budget Final Outturn Variance Final Outturn
£ £ £ £
Rental Income 161,707 116,420 (45,287) 134,275 Under-recovery in income at Newhouse Building due to
lease agreements (rent free periods)
Bank Interest 700 7,807 7,107 1,537 Increase in interest due to market impacts
Investments 0 0 0 207,200 No reciepts from Development sales in 2022/23
Misc 0 1,565 1,565 0
Total Income 162,407 125,792 (36,614) 343,011
Expenditure:
Staff costs (182,570) (183,420) (850) (167,294)
Board Costs (15,000) (15,000) 0 (15,000)
Premise Costs (9,250) (7,971) 1,279 0
Operating Costs (79,000) (66,290) 12,710 (78,608) Decreased expenditure in development and land
management fees
Running Costs (12,000) (8,983) 3,017 (21,837) Decrease expenditure in Insurance due to increase in
letting
Total Expenditure (297,820) (281,664) 16,156 (282,739)
Net Surplus/Deficit (135,414) (155,872) (20,458) 60,273
Accounting adjustments:
Release of deferred grant income 0 1,638,735 1,638,735 873,049
Unrealised gain/(loss) on investment
property
0 193,175 193,175 (5,905)
Impairment 0 (1,638,735) (1,638,735) (251,185)
Tax provision 0 (49,575) (49,575) (165,945)
Increase / (Utilisation) of Reserves (135,414) (12,272) 123,142 510,286
2022/23
Page 305 of 312

Page 306

Fusion Assets Appendix 3
Overall Financial Standing - Balance Sheet as at 30 June 2023
Balances/ Indicator as at 30 June
2023
as at 31 March
2023
Movement Commentary
£'000 £'000 £'000
Fixed Assets:
Investments 1,040 1,040 0 Gartcosh Estates LLP
Investment Property 2,195 2,195 0 Newhouse Building 1
3,235 3,235 0
Current Assets:
Stocks 3,939 3,191 748 Work in progress
Trade Debtors 414 1,170 (756) Debtors, VAT recoverable, deferred taxation, accrued income, prepayments
Bank 3,807 2,716 1,091 Increase largely due to reciept of profit share element in relation to sale of part
of the Newhouse development
Short-Term Investments 0 0 0
8,160 7,077 1,083
Current Liabilities:
Other Creditors inc. VAT & other taxes (4,064) (3,776) (288) Deferred income (VDLF), accruals, tax
(4,064) (3,776) (288)
Net current Assets/(liabilities) 4,096 3,301 795
Creditors:  Amounts falling due over 1 year (2,467) (2,467) 0 Deferred income (Boots)
Net Asset / (Liabilities) 4,864 4,069 795
Page 306 of 312

Page 307

Fusion Assets Limited Appendix 4
Financial Performance as at 30th June 2023
Income & expenditure 2022/23 Commentary
Annual
Budget
Projected
Outturn Variance Final Outturn
£ £ £ £
Rental Income 150,865 150,865 0 116,420
Bank Interest 1,000 7,000 6,000 7,807
Investments 0 0 0 0
Misc 0 0 0 1,565
Total Income 151,865 157,865 6,000 125,792
Expenditure:
Staff costs (188,950) (188,950) 0 (183,420)
Board Costs (15,000) (15,000) 0 (15,000)
Premises Costs (9,420) (12,170) (2,750) (7,971)
Operating Costs (153,500) (153,500) 0 (66,290)
Running Costs (14,000) (14,000) 0 (8,983)
0 0 0 0
Total Expenditure (380,870) (383,620) (2,750) (281,664)
Net Surplus/Deficit (229,005) (225,755) 3,250 (155,872)
Accounting adjustments:
Release of deferred grant income 0 0 0 1,638,735
Unrealised gain/(loss) on investment
property
0 0 0 193,175
Impairment 0 0 0 (1,638,735)
Tax provision 0 0 0 (49,575)
Increase / (Utilisation) of Reserves (229,005) (225,755) 3,250 (12,272)
2023/24
Page 307 of 312

Page 308

Appendix 5 
0.000
0.500
1.000
1.500
2.000
2.500
3.000
3.500
4.000
Apr-
23
May-
23
Jun-
23 Jul-23 Aug-
23
Sep-
23
Oct-
23
Nov-
23
Dec-
23
Jan-
24
Feb-
24
Mar-
24
Apr-
24
May-
24
Jun-
24 Jul-24 Aug-
24
Sep-
24
Oct-
24
Nov-
24
Dec-
24
Jan-
25
Feb-
25
Mar-
25
balance 2.829 2.804 3.807 3.204 2.500 2.532 2.817 2.899 2.888 3.063 2.890 2.563 2.594 2.626 2.621 2.627 2.660 2.650 2.576 2.585 2.575 2.529 2.566 2.484
Forecast Cash Balances to  31st March 2025
Page 308 of 312

Page 309

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    JMcK Date 17/11/23 
Contracts awarded below Committee approval threshold 
From  James McKinstry - Chief Officer (Assets and Procurement)  
E-mail McKinstryJ@northlan.gov.uk  Telephone 07939 281 102 
1. Background 
1.1 The Local Government (Scotland) Act 1973 require local authorities to make standing
orders with respect to the making of contracts for the supply of goods or materials or
for the execution of works. 
1.2 The Council’s General Contract Standing Orders (“GCSOs”) set out the council’s
specific procurement procedures and responsibilities at all spend levels, and include
the reporting requirements of procurement activity, including contracts awards, to
committee for either approval or acknowledgement. 
Executive Summary
In accordance with the Council’s General Contract Standing Orders (“GCSOs”), GSCO
21.10 requires a summary report be presented to members with details of contracts
awarded since last committee, specifically for the spend range: 
• over £50,000 but below £500,000 for supplies or services; and,
• over £500,000 but below £2,000,000 for works. 
Recommendations
It is recommended that the Enterprise and Fair Work Committee: 
1) Acknowledge the contract awards made since last committee reporting cycle.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Item 13
Page 309 of 312

Page 310

2. Report 
2.1 In accordance with GSCO 21.10, this report summarises the contract awards since last
committee, specifically for the spend range:
• over £50,000 but below £500,000 for supplies or services; and,
• over £500,000 but below £2,000,000 for works. 
2.2 If you require further information regards the contract awards reported, please refer to
the lead service area / chief officer detailed in the appendix. 
3. Measures of success 
3.1 All requirements contracted contribute to either the council’s programme of work and/or
fulfil a statutory requirement. 
3.2 All contract awards secure best value for the council in accordance with their evaluation
criteria. 
3.3 All necessary diligence has been undertaken in the evaluation and appointment of
contractors. 
3.4 All contract awards are logged in the council’s contract register. 
4. Supporting documentation 
4.1 Appendix 1 – Summary of contracts awarded. 
James McKinstry
Chief Officer (Assets and Procurement) 
5. Impacts 
5.1 Impacts considered as part of the contract award procedures are recorded in the
individual contract award reports held by the lead service area.  
Page 310 of 312

Page 311

Appendix 1 – Summary of Contracts Awarded 
Contract Ref NLC-SLP-23-069
Title Ravenscraig Access Infrastructure South- pre-works site security 
Classification Services - Standard
Lead Service Area / Chief Officer Place / Pamela Humphries      
Competition Governance by Value Lower Threshold Regulations
Procurement Route Framework Call-off, Direct Award
No. of Framework Contractors 14
No. of Bids Received 1
Award Criteria Framework, Best Value Assessment
Evaluation Scores Successful *Not applicable Others *Not applicable
Comments *No further evaluation scores recorded; Contractor awarded is ranked 1st on the Framework      
Award
Details
Value £145,000
Contract Duration 13 months
Contractor Name Securigroup Limited 
Contractor Size Large
Contractor Location Glasgow
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? No      
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer
Scotland Duty ☒
HR Policy Impact ☐ Data Protection
Impact ☐
Environment /
Carbon Impact ☐
Risk Impact ☒ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☐
Communications
Impact ☐
Armed Forces
Covenant Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer       
Page 311 of 312

Page 312

Page 312 of 312