Page 1

24 August 2023
Members of the
Enterprise and Fair Work Committee
Chief Executive’s Office
Archie Aitken
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk
Notice is given that a Meeting of the Enterprise and Fair Work Committee is to be held in the Council Chamber, Civic
Centre, Windmillhill Street, Motherwell, ML1 1AB on Monday, 04 September 2023 at 10:00 AM which you are requested to
attend.
The agenda of business is attached.
Archie Aitken
Chief Officer (Legal & Democratic)
Members :
Clerk Name: Clare Louise McDonald
Clerk Telephone: 01698 302190
Clerk Email: mcdonaldcl@northlan.gov.uk
A McVey, F McKay, A Bustard, D Crichton, P Di Mascio, K Docherty, K Duffy, H Dunbar, W Goldie, L Jarvie, A Khan, K
Larson, J Leckie, J Logue, F MacGregor, A Masterton, A McCrory, M McPake, L Nolan, L Roarty, G Robinson, R Sullivan,
J Toner, S Watson, C Williams.
Page 1 of 98

Page 2

Page 2 of 98

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical Standards In Public
Life Etc. (Scotland) Act 2000   
2 Transforming Places Economic Regeneration Delivery Plan and
Performance Framework - Annual Progress Update
Submit report by the Chief Officer (Place) providing an update on the progress
being made towards the implementation and delivery of North Lanarkshire's
Economic Regeneration Delivery Plan (ERDP) and associated Action Plan (copy
herewith) 
5 - 48 
3 Smart Hub Lanarkshire - Phase 3 Funding (UKSPF)
Submit report by the Chief Officer (Place) providing an update on the outputs and
outcomes of Smart Hub Lanarkshire, detailing plans to continue a phase two
delivery programme (copy herewith) 
49 - 56 
4 Re-appointment of Category B Director Routes to Work
Submit report by the Chief Officer (Education - South) seeking approval for the re-
appointment of the Category B Director to the Board of Directors of Routes to
Work Limited (copy herewith) 
57 - 62 
5 Contract Variation - Allotment Projects
Submit report by the Chief Officer (Place) to inform of a variation in costs against
tender contract price incurred on two projects undertake by the Growth Team
(copy herewith) 
63 - 70 
6 Transforming Places: Contract Award for the Centre Cumbernauld
Asset Management and Property Management
Submit report by the Chief Officer (Place) advising of the award of contracts for
Asset Management Services and Property Management Services at The Centre,
Cumbernauld (copy herewith) 
71 - 78 
7 Transforming Places: Contract Award for Braidhurst Industrial Estate
Works Contractor
Submit report by the Chief Officer (Place) advising of the award of a contract for
Braidhurst Industrial Estate Works to Tilbury Douglas Construction Ltd (copy
herewith) 
79 - 90 
8 Contracts Awarded below Committee Approval Threshold
Submit report by the Chief Officer (Asset and Procurement) providing notification
of the contracts awarded between 1 April and 30 June 2023 with a value below the
financial threshold requiring Committee approval (copy herewith) 
91 - 98  
EXCLUSION OF PUBLIC
The Sub-Committee is asked to consider passing the following resolution: "That
under Section 50A(4) of the Local Government (Scotland) Act 1973, the public be
excluded from the meeting for the following item of business on the grounds that it
involves the likely disclosure of exempt information as defined in paragraphs 6 &
14 of Part 1 of Schedule 7A of the Act". 
9 Business Gateway Lanarkshire - Future Delivery Model
Submit report by Chief Officer (Place) advising of the outcome of an options
appraisal and risk assessment undertaken to consider and evaluate the most
appropriate future delivery model for the Business Gateway Lanarkshire Service
(copy herewith) 
Page 3 of 98

Page 4

Page 4 of 98

Page 5

North Lanarkshire Council
Report 
Does this report require to be approved? ☐ Yes  ☒ No
Ref PH/DG Date 01/09/23 
From Pamela Humphries, Chief Officer (Place) 
E-mail Greerd@northlan.gov.uk Telephone 
Executive Summary 
David Greer, Growth
Programme Manager:
0758 305 9816
The purpose of this report is to update committee on the progress being made towards the
implementation and delivery of North Lanarkshire’s Economic Regeneration Delivery Plan
(ERDP) and associated Action Plan. The Action Plan is updated annually, and this progress
report details activity as at financial year end 2022/23. 
This report also presents the latest ERDP Performance Framework update which is used
to monitor wider ERDP performance over the short, medium and longer term (through to
2035). Unlike the ERDP Action Plan, figures within the Performance Framework are
reported on a cumulative basis to show the progress against the longer-term ambitions of
the ERDP. 
Recommendations
It is recommended that Enterprise and Fair Work Committee: 
(1) Consider the content of this report and progress made towards the delivery of the
2022/23 ERDP Action Plan, which was approved by Enterprise and Growth
Committee in February 2022. 
(2) Acknowledge the wider progress and performance against the ERDP 2019-2023,
2023-2028 and beyond. 
The Plan for North Lanarkshire
Priority Improve economic opportunities and outcomes
Ambition statement (1) Ensure a housing mix that supports social inclusion and
economic growth
(2) Refocus our town centres and communities to be multi-
functional connected places which maximise social, economic, and
environmental opportunities
Enterprise and Fair Work Committee
Transforming Places
Economic Regeneration Delivery Plan and Performance
Framework – Annual Progress Updates
Item 2
Page 5 of 98

Page 6

1. Background
(3) Maximise the use of our marketable land and assets through
improved development in business and industrial infrastructure
(4) Market and promote North Lanarkshire as the place to live,
learn, work, invest, and visit
(5) Grow and improve the sustainability and diversity of North
Lanarkshire's economy
1.1 The ERDP aims to help co-ordinate physical and economic regeneration activity across
North Lanarkshire, increase economic output and help address social and economic
inequality. 
1.2 The Economic Regeneration Delivery Plan (ERDP) was initially approved by the
Enterprise and Growth Committee in August 2019, covering the period 2019-2023. A
light-touch refreshed ERDP, covering the period 2023-2028, was then approved by
Enterprise and Fair Work Committee in February 2023. 
1.3 Since 2019, an Action Plan to support the delivery of the ERDP through a range of key
measures and investment programmes has also been produced and approved each
year by committee. The Action Plan sets the priorities for the financial year ahead,
reflecting progress made to date and the evolving priorities of the council. 
1.4 The 2022/23 Action Plan was approved by Enterprise and Growth Committee in
February 2022 and the current 2023/24 ERDP Action Plan was approved in February
2023. 
1.5 An accompanying ERDP Performance Framework was approved by Enterprise and
Growth Committee in February 2021. This comprises of a group of performance
indicators at three levels. These indicators aim to collectively provide an overview of
how the North Lanarkshire economy is performing as well as helping us to understand
the impact that the delivery of the ERDP is having on improving economic opportunities
and outcomes for all. 
2. Report 
2.1 Economic Regeneration Delivery Plan 2023-2028 
2.1.1 The refreshed ERDP continues to focus on the same four key inter-related themes as
the 2019-23 plan: 
• developing housing that promotes improved quality of life and creates a better place
to live;
• reshaping our town centres to ensure that these provide modern and attractive
centres that meet the needs of our communities;
• improving our business and industrial infrastructure, creating opportunities for
investment and for companies to start-up or relocate here; and
• continuing to improve our connectivity and develop new opportunities by
transforming our road, rail and digital infrastructure. 
2.1.2 To support the delivery of these objectives, annual ERDP Action Plans have been
developed each financial year since 2019/20.
Page 6 of 98

Page 7

2.2 2022/23 Action Plan – Performance Review 
2.2.1 Appendix 1 provides an update on the ERDP Action Plan objectives and targets
achieved during 2022/23. 
2.2.2 Good progress continues to be made against the ERDP’s key objectives with highlights
during 2022/23 including: 
• the delivery of an additional 152 new affordable homes via the New Supply
Programme, taking completions to 1,646 by 31 March 2023;
• 11 low carbon (net zero) homes at Dykehead Road, Airdrie were completed and
handed over to NLC, as part of the council’s ambition to ensure our homes are
sustainable and fit for purpose;
• Town Action Plans (TAP) have been subject to public consultation and are nearing
completion for the towns of Airdrie, Motherwell and Wishaw.
• £9.225m was secured from the UK Government’s Levelling Up Fund to support the
delivery of the Town Vision for Cumbernauld, including the acquisition of The Centre
Cumbernauld (completed in June 2023);
• Registered Social Landlords (RSLs) delivered 291 units at town centre
developments (including edge of town);
• Fusion Assets enabled the delivery of 47,500 sq.ft new business and industrial
workspace at Link Park, Newhouse (plot A2) through a development agreement;
• Significant progress was made on the delivery of City Deal projects, such as the
Ravenscraig Access infrastructure and the West Coast Mainline crossing (the rail
bridge was installed at Ravenscraig in April 2023) during 2022/23.
• Commsworld has delivered 162,000 metres of fibre infrastructure and will complete
the fibre rollout by November 2023. 
2.3 ERDP Performance Framework 
2.3.1 The ERDP Performance Framework also highlights significant progress in improving
economic opportunities and outcomes for North Lanarkshire’s residents and
businesses. Highlights achieved under the first ERDP, included: 
• 630 homes brought into council ownership via the Open Market Purchase Scheme,
including some homes previously sold under the Right to Buy.
• Over £73 million invested in town centre (including edge of town) developments, of
which around £32 million was secured via external funding sources.
• Town Visions created for all eight North Lanarkshire towns, with each town
scheduled to have an accompanying Town Action Plan in place by early 2024/25;
• 1,663 new affordable town centre homes completed (including edge of town sites)
by the council and housing associations. This includes developments across most
of our towns with completed sites including Caledonian Avenue (Bellshill), Berryhill
Road (Cumbernauld), 95 Main Street (Kilsyth) and Roberts Street (Wishaw)
amongst others.
• 117,410 sq.ft of business and industrial workspace created or refurbished as a
result of investment by NLC, Fusion Assets and North Lanarkshire Properties
(NLP).
• £42.34M invested in key road infrastructure projects funded via NLC and the
Glasgow City Region City Deal 
Page 7 of 98

Page 8

3. Measures of success 
3.1  The annual ERDP Action Plan contains various targets, the delivery of such being key
to the success of the refreshed ERDP. 
3.2 A robust Economic Performance Framework has now also been established and
contains a series of key performance indicators, with short, medium, and long-term
targets attached as the operational measures of success. 
4. Supporting documentation 
4.1 Appendix 1 Economic Regeneration Delivery Plan Action Plan 2022/23 – End       
of year performance report 
4.2  Appendix 2 ERDP Performance Framework 
Pamela Humphries
Chief Officer (Place) 
Page 8 of 98

Page 9

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Yes ☐ No ☐
The Equality Impact Assessment for the Economic Regeneration Delivery Plan has been
undertaken and is published on the council’s web site
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
If Yes, have all relevant financial impacts been discussed and agreed with
Finance?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact
Does the report / project / practice contain or involve the processing of personal
data?
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk
Yes ☐ No ☐
5.6   Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Yes   ☐ No ☒
If Yes, please provide a brief summary of the impact? Page 9 of 98

Page 10

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)?
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Risks are recorded and managed within Corporate Risk Register. 
Key risk is failure to deliver on the ERDP and its objectives of helping co-ordinate
physical and economic regeneration activity across North Lanarkshire, increasing
economic output and helping address social and economic inequality. This would
result in economic and social benefits to residents and business across North
Lanarkshire and significant reputational damage to the Council given the
widespread public nature of the programme.
5.10 Armed Forces Covenant Duty
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)?
Yes ☐ No ☒
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC).
Page 10 of 98

Page 11

Appendix 1 
ERDP Action Plan 2022/23 
End‐Year Performance Report
Page 11 of 98

Page 12

Theme: Live
Priority 1: We will help deliver the homes North Lanarkshire needs to grow
Key Action Milestone Target Update RAG
Ensure our future
housing mix supports
social inclusion and
economic growth
Deliver the New
Supply Programme
1,894 new council homes, in total, projected
to be completed by 2022/23 (including open
market purchases)
152 new council homes completed during 2022/23. 
As at end of 2022/23, 1,646 new council homes are
complete (including Open Market Purchase Scheme).
Amber   
A further 521 homes are currently under construction.
Target expected to be met during 2023/24. 
Enable the private
sector to support
the delivery of the
New Supply
Programme
Progress delivery of 44 acquisitions of new
build housing from the private sector through
the development and delivery of a pathfinder
approach and other partnership arrangements
in 2022/23
Five projects with a combined total of 90 affordable
homes now under construction for NLC, on mixed
tenue sites via private developers.
Green 
Prepare and
support the
delivery of the
Strategic Housing
Investment Plan
(SHIP)
Annual SHIP prepared which identifies suitable
deliverable sites to meet Local Housing
Strategy priorities and maximise the use of
available Scottish Government investment
target for 2022/23 of £32.967m
SHIP (2023/24 ‐ 2027/28) formally approved and
published on NLC website. 
SHIP (2024/25) currently being developed. Due for
submission in October 2023.
Green
Ensure our homes
are sustainable,
digitally connected
and fit for purpose
Develop
demonstrator
projects which
support the
council’s ambition
for digitally
connected and
carbon neutral
living
Develop an interactive smart home standard
for future use in new build Homes (through
enabling technology to be installed post
2022/23 drawing upon lessons learned from
the smart homes pilot at Kerr Grieve Court
retirement housing complex)
FTTP and Cat5e cabling now supplied as standard in
NLC new build homes to support future technologies
and use of telecare/telehealth solutions. Development
of a full interactive smart home model continues to be
progressed.
Amber
19 pilot eco homes delivered at Dykehead
Road, Airdrie featuring air source heat pump
heating, increased Photovoltaics and
powerwall battery storage.
First 11 low carbon (net zero) homes at Dykehead
Road, Airdrie now complete and handed over to NLC. 
New Supply project at Brandon Street, Motherwell,
featuring ground source heat pumps, currently under
construction.
Green
Page 12 of 98

Page 13

Theme: Invest
Priority 2: We will reshape and repopulate our town centres
Key Action Milestone Target Update RAG
Deliver Town Visions
for North
Lanarkshire
Develop Town
Centre
Action Plans for all
town
centres
Complete Town Centre Action Plans in
consultation with Community Boards for 3
town centres.
Town Action Plan consultations were held during May‐
June 2023 for the towns of Airdrie, Motherwell and
Wishaw. The finalisation of these three TAPs are now
nearing completion.
Amber
Develop a sense of
place by protecting,
repurposing or
redeveloping vacant,
derelict or unused
priority buildings and
sites within our town
centres and investing
in town centre
regeneration activity
that will support the
delivery of the town
visions
Develop and
implement plans to
repurpose
and redevelop
vacant, derelict or
unused priority
buildings and
sites within our
town centres
aligned to Town
Visions and
promote Town
Centre Living
Develop business case for the delivery of 5
town centre projects to ensure NLC have
‘shovel ready’ projects that can help secure
Scottish Government planned investment for
‘Town Centres’ and ‘Place’ over the next 5
years.
A feasibility study and project brief were completed
for a number of gap sites and housing conversion
sites to support a Levelling Up Fund Bid for Airdrie
Town Centre. 
This study covered 5 projects: Coats House, the former
Citizens Advice Bureau, the Police Station, the former
Poundstretcher property, a block at 5‐17 Graham
Steet and a site at East High Street with estimated
construction costs totaling more than £17m. 
The LUF application was submitted but unfortunately
was unsuccessful. However, the council did secure
£0.15M development funding from Historic
Environment Scotland and the National Heritage
Lottery Fund to support a future bid to these funders to
enable the delivery of a £3.1M heritage conservation
project for Airdrie Town Centre entitled ‘Rediscovering
Airdrie’. 
In addition to the plans supported in Airdrie, during
2022/23, feasibility studies were also commissioned
and initiated for projects in Bellshill, Motherwell and
Coatbridge Town Centres, These will enable the future
development of business cases for the regeneration
and improvement of a number of sites and assets.
Green 
Page 13 of 98

Page 14

Develop an action plan for key vacant and
derelict properties across North Lanarkshire
(including town centre properties)
Via the Town Action Plans, which are currently under
development, plans will be identified for the
regeneration of key vacant and derelict properties
within our 8 town centres. Opportunities will be
assessed according to funding availability and
deliverability.
Amber  
Develop a strategy for town centre living as
part of the emerging town action plans
Town Action Plans are in the process of development
(and are nearing completion for Airdrie, Motherwell
and Wishaw). NLC's Growth and New Supply teams
will continue to work together, alongside RSL's and
other relevant external agencies to prioritise town
centre living and deliver these opportunities where
appropriate. 
During 2022/23, we have continued to progress town
centre living projects such as the former Orrs building
in Airdrie and the former YMCA property on Brandon
Street, Motherwell.
Amber
Complete acquisition of 3 town centre
properties/ sites earmarked for
conversion/property improvement schemes in
2022/23.
Two parcels of land acquired at the rear of 39‐41 Main
Street, Coatbridge which will form part of a larger
development once all acquisitions are complete. 
In addition, although the acquisition of The Centre
Cumbernauld was delayed, this was completed in June
2023. 
A number of other negotiations to acquire further
properties also took place in 2022/23 and are
continuing. These further acquisitions are expected to
follow during 2023/24, following necessary due
diligence.
Amber
Page 14 of 98

Page 15

Finalise land packaging of two key brownfield
town centre sites for residential development
Kings House, Wishaw site investigations and
demolition now complete. This cleared site will form
part of the Stewarton Street and Kings House
development which is expected to deliver 18
residential units in total. A planning application has
now been submitted for this project.
Green   
Two parcels of land were purchased during 2022/23 at
Main Street, Coatbridge in addition to sites purchased
in previous financial years. This will form part of a
larger project to deliver 49 units at this site. Two
further properties remain outwith NLC ownership and
negotiations are ongoing. 
Completion of 200 new town centre/edge of
town homes by NLC and RSL’s during 2022/23.
291 units delivered during 2022/23 at town
centre/edge of town developments including Tinkers
Lane (Motherwell), Burns Road (Cumbernauld),
Broomknoll Street (Airdrie), 449 Main Street (Bellshill)
and Main Street (Wishaw).
Green
Undertake a Green/Blue feasibility study in
conjunction with Scottish Water to look at
options for using suitable vacant and derelict
land to remove surface water from the
overloaded combined sewer network to
provide ‘credits’ which could be used to
offset development within a town centre site. 
This could potentially provide opportunities to
develop town centre sites that currently have
complex drainage issues which would
otherwise be difficult to redevelop.
Study took longer than initially anticipated due to
assessment of various options. Due for completion Q3
2023.
Amber
Support new
investment within
North Lanarkshire
Town Centres (and
wider community
regeneration and
place making)
Identify and Secure
new investment for
North Lanarkshire’s
Town Centres
Delivery of the Scottish Government’s Place
Based Investment Programme budget
allocation – with specific investment focus on
town centres
All Place Base Investment Programme (PBIP) funds for
2022/23 (£2.436m) were contractually committed as
per funding requirement.
Green
Submit UK Levelling Up Fund bids for Airdrie,
Cumbernauld and Coatbridge town centres
3 bids were submitted to the UK Government's
Levelling Up Fund. The Cumbernauld bid was
successful with NLC receiving £9.25m to support the
delivery of the town vision for Cumbernauld, including
Green
Page 15 of 98

Page 16

the acquisition of 'The Cumbernauld Centre' shopping
mall. 
Support and enable a minimum of 3
Community Regeneration/Place making bids
through, for example, RCGF and V&DLIP
funds.
Submitted 5 bids to RCGF and 3 bids to VDLIP Round
1. Motherwell FC Well Hub project was successful in
securing £215k from the Scottish Government's RCGF
and Glenmanor Greenspace secured £230k from
VDLIP.
Bids were submitted to Historic Environment Scotland
and the National Lottery Heritage Fund for
development funding towards the Rediscovering
Airdire project. Awards of £50k (HES) and £100k
(NLHF) were later announced in June 2023.
Green
Theme: Work
Priority 3: We will enable our people and businesses to thrive
Key Action Milestone Target Update RAG
Maximise the use of
our marketable land
and assets through
the development
of business and
industrial
infrastructure
Improve the
provision of high‐
quality business
and industrial
space either
directly or through
our ALEOs and
Joint Ventures
NLC investment of a minimum of £2.5M for
key business and industrial infrastructure
projects
Fusion Assets have invested £1.15M VDLF in enabling
works for industrial development at Gartcosh Business
Interchange, as part of an overall £1.7M infrastructure
project (completed in June 2023).
A further £1.9M was secured for 2022/23 investment
at Ravenscraig Business Land, Plot 1 although the
acquisition of this site was delayed. This money will be
carried forward as the acquisition of this site to Fusion
Assets has now been agreed with Ravenscraig Ltd.
subject to the Scottish Government approval of
further funding (NLC’s 23/24 VDLF Programme) to
ensure funding is available to complete all initial
remediation and enabling works at this site as a
condition of sale.
Further additional funding has been secured for
significant investment in business and industrial
infrastructure during 2023/24 for the upgrading of
Amber
Page 16 of 98

Page 17

Braidhurst Industrial Estate (Motherwell), Condor Park
(Eurocentral) and Link Park (Newhouse). 
5.43ha of land to be improved or enabled (by
NLC/NLC ALEO) for industrial or business use
in 2022/23
Fusion Assets remediated 3.69ha of land at Gartcosh
Industrial Park, Phases 3 & 4. 
Future development has also been enabled through
VDLF funding secured for the acquisition of
Ravenscraig Business Park Plot 1 (2.55ha)
Amber
£11.64M external (including private sector)
investment secured by NLC/NLC ALEO for
business and industrial infrastructure in
2022/23
£7.55M has been invested by Realty Corporation at
Link Park (Plot 2 – Co‐op site), enabled by previous
investment in this site by Fusion Assets.
This has released £1.5M to Fusion Assets to support
the construction of a second industrial unit at Link
Park (Plot 1) costing £2.156M (including £0.656M
provided through NLC’s VDLF Programme). These
works have now been contracted and are due to be
completed late 2023.
An additional £1.8M VDLF investment was also
secured during 2022/23 for works at Ravenscraig
business land and Gartcosh Business Interchange with
a further £1.8M being sought for industrial
infrastructure works for 2023/24.
Amber
47,500sqft of new business and industrial
workspace completed (by NLC/NLC ALEOs) in
2022/23 at Link Park, Newhouse.
Fusion Assets has delivered 47,500sqft at Link Park,
Newhouse (Plot A2) through a development
agreement.
Green
Enable private
sector investment
for business and
industrial
Work with Fusion Assets to procure joint
venture private sector investment partner for
a minimum of 1 new industrial/office
development.
Condor Park Joint Venture has been agreed, subject to
a further phase of enabling works being undertaken
and loan finance being secured.
Amber
Page 17 of 98

Page 18

infrastructure Develop the business case required to support
the capital investment required to further
support Fusion Assets and help accelerate
industrial/office construction works through
Joint Venture partnerships.
Due to budget constraints, additional NLC funding
could not be provided to help accelerate the growth
of Fusion Assets. Instead, business cases have been
prepared for individual projects to help Fusion Assets
secure funding for future development, and ultimately
company growth.
Amber
Ensure our investment
activities deliver
inclusive growth
Support
investment
in local business
infrastructure that
will enable the
growth of micro‐
businesses and
SMEs (particularly
within recognised
areas of need)
Progress delivery of a regeneration scheme for
Braidhurst Industrial Estate that can be used
as a demonstrator project which can
potentially be rolled out for the renewal of
older/edge of town industrial estates across
North Lanarkshire.
Design team appointed and the preferred contractor
identified. Works due to start on site late
Summer/early Autumn 2023.
Green
Business & Industry
Strategy
Develop a 5‐year Business and Industry
Strategy in line with Investment opportunities
and to support development of new Local
Development Plan
Development of Business and Industry Strategy
underway including assessment of sites currently
allocated for business and industrial development
within Local Development Plan.
Amber
Theme: Invest
Priority 4: We will connect North Lanarkshire
Key Action Milestone Target Update RAG
Deliver the City Deal
Programme
Construct
Ravenscraig Access
Infrastructure to
support the
redevelopment of
Ravenscraig and
connect the M74 to
M8 as part of Pan
Lanarkshire
Transport Corridor
Deliver construction enabling works for West
Coast Main Line crossing.
West Coast Mainline Crossing construction progressed
over 2022/23 with the crossing moved into place
under railway in April 2023.
Green
Page 18 of 98

Page 19

Construct East
Airdrie Link Road as
a key North South
route as part of the
Pan Lanarkshire
Transport Corridor
Appoint consultants to take forward detailed
design of the road and active travel
infrastructure
The scope for the Stage 3 commission has been
finalised. Tenders will be issued in July 2023. It is
aimed to appoint a consultant by the end of 2023.
Amber
Develop Outline Business Case for submission
to the City Deal Cabinet
The OBC will now be submitted in late 2023 for
consideration at the February 2024 Glasgow City
Region City Deal Cabinet.
Amber
Create an
improved transport
interchange at
Motherwell Rail
Station to support
sustainable and
active travel and
create an improved
gateway into the
Glasgow City
Region.
Completion of Motherwell Rail Station
Works (by ScotRail)
Over 2022/23 the works at Motherwell Rail Station
progressed. However, delays to completion were
experienced due to various issues including utilities
and structural. The work were completed in June 2023
with an official opening on 20 June.
Amber
Completion of Muir Street works. Over 2022/23 the works progressed, however, delays
to completion were experienced due to utilities issues
and interactions with the Motherwell Rail Station
contract which was in delay. The works were
completed and the new infrastructure opened in May
2023, with an official re‐opening in June 2023.
Amber
Contribute to the
construction of
Orchard Farm
roundabout to
support
development
on the A8/M8
Outline Business Case approval by the
City Deal Cabinet
The Outline Business Case (OBC) was approved in
August 2022. 
The project is led by a private sector partnership. 
It is aimed to progress a funding agreement with the
partnership to conclusion by Q3 2023/24 with
submission of a Full Business Case (FBC) now targeted
for mid‐2024.
Green
Deliver infrastructure
that will complement
and add value to the
City Deal Investment
Enable and take
forward
investment within
Ravenscraig
Submit UK Levelling Up Fund bid to support
future enabling investment at Ravenscraig.
A bid for Ravenscraig was submitted to Round 2 of the
UK Governments Levelling Up Fund during 2022/23.
Unfortunately, the bid was unsuccessful.
Green
Page 19 of 98

Page 20

Alternative options are now being considered to bring
forward enabling works investment on the identified
site. 
Delivery of Ravenscraig Active Travel Link
(RATL) infrastructure.
Work on the RATL phase 2 project has progressed
over 2022/23 with completion in July 2023.
Green
Take forward
investment to
improve
connectivity
to/from
Motherwell Rail
Station and
promote
sustainable/active
travel.
Deliver Phase 1 of active travel route
infrastructure between Motherwell Rail
Station, Motherwell town centre and
Strathclyde Country Park.
Phase 1a of the Motherwell Station Active Travel Links
project was delivered over Q3 and Q4 of 2022/23,
with investment of circa £200k.
Delivery of Phase 1b has been delayed due to
additional scope requirements identified, which
require a new tender process, and new utility risks
which need to be assessed. It is planned to re‐tender
and deliver this phase, along with Phase 1c, over 2023
and 2024. This is dependent on a full funding package
being assembled.
Amber
Ensure our investment
infrastructure
contributes to the
council’s ambitions for
carbon reduction
Support the
delivery of EV
infrastructure
across North
Lanarkshire and at
key transport
locations
Develop and deliver an EV Charging Strategy
for North Lanarkshire (as part of a wider
Regional Strategy)
Mott McDonald has completed an EV strategy that
will support access to Scottish Government funding. 
Additional work has also been completed around
fleet.
Green
Establish an EV Charging Working Group to
support the development and delivery of EV
Charging within North Lanarkshire
EV Working Group established. Green
Page 20 of 98

Page 21

Deliver a worldclass
digital infrastructure
across North
Lanarkshire
Support the
delivery of the
Framework
Agreement for the
Provision of Digital
Connectivity
Services and
associated Call‐Off
contracts
Detailed delivery targets to be set in line with
the project plan once Framework is in place
and initial project plan approved.
The project to deliver full fibre connectivity through
the Council is progressing with 63 sites migrated to
the Commsworld Wide Area Network (WAN) service. 
Commsworld have delivered 162k metres of Fibre
Infrastructure (99% against January target of 163k)
and will complete the WAN and fibre rollout by
November 2023 which has been extended by 4
months due to civils construction delays. 
The fibre infrastructure is key to enable other call off
contracts including the provision of Internet Services
and Public Wi‐Fi. 
The Public Wi‐Fi service will incorporate town centres
and nominated public use buildings and spaces where
this service will provide service and community
benefits. 
The infrastructure being deployed will be a key
enabler for further digital opportunities throughout
North Lanarkshire.
Amber
Support the
Development and
Delivery of Proof of
Concepts; Added
value provisions;
and Community
Benefits identified
within the
Framework and
Call‐Off Contracts
Commsworld have been actively engaging with the
council over the added value and community benefits
offered within the council. 
Highlights as at 31st March 2023:
• 3 Modern Apprentices have been recruited
undertaking placements both with Commsworld
and the council
• A Flagship Primary School STEM event in
partnership with SMARTStems and Young
Enterprise Scotland took place at New College
Green
Page 21 of 98

Page 22

Lanarkshire in February 2023 with 200 pupils from
11 schools attending.
• 15 STEM career workshops in partnership with
SMARTStems have been delivered to 765 pupils
across 15 schools.
• 14 Enterprise Inspiration sessions have been
delivered in partnership with Young Enterprise
Scotland 
Commsworld have been liaising with the Driving
Digital Locally Group to identify actions within the
LOIPs to improve digital capabilities within local
communities. 
Active Travel Support and Enable
Investment in
Active Travel
A further 10km of Active Travel routes
enhanced or created during 2022/23.
A total of 5.66 kms of active travel infrastructure was
created in 2022/23. 
Projects include Newhouse to Salsburgh, A71 Horsley
Brae (Wishaw), South Biggar (Airdrie), Woodside
Street (Coatbridge), Ravenscraig Active Travel Link
Phase 2, and Motherwell Station Active Travel Phase
1A. 
The target of 10km was developed prior to the
development of NLC’s Active Travel Strategy (ATS)
which was adopted in 2021 and therefore revised
targets will be incorporated within future ERDP Action
Plans in line with the ATS.
Amber
Page 22 of 98

Page 23

RAG status key
Indicator Definition
Green Target met or exceeded. Project is generally on track, within budget, within scope and likely to deliver expected benefits.
Amber Target narrowly missed. Minor delays to project, minor cost overruns, changes to scope or reductions in benefits.
Red Target missed. Project experiencing significant delays, significant cost overruns, changes to scope or reductions in benefits.
Page 23 of 98

Page 24

Appendix 2 
Economic Regeneration Delivery Plan (ERDP)
Performance Framework 
June 2023
Page 24 of 98

Page 25

Introduction 
Improving economic regeneration plays a significant part
in our shared ambition to make North Lanarkshire the
place to live, learn, work, invest and visit.
The Economic Regeneration Delivery Plan (ERDP) sets out
how we will improve economic opportunities and
outcomes for everyone in North Lanarkshire. This includes
delivering new homes, reshaping town centres, attracting
investment and jobs. Our investments will benefit
everyone who lives, learns, invests and visits within North
Lanarkshire.
An ERDP Action Plan is updated annually and focuses on
our key objectives and day‐to‐day activities in delivering
the longer‐term vision set out within the ERDP and The
Plan for North Lanarkshire.
The ERDP Performance Framework comprises a set of
performance indicators at three levels. These indicators
aim to collectively provide an overview of performance
that helps us to understand the impact of our work on
improving economic opportunities and outcomes for all.
Given the shared ambition set out within The Plan for
North Lanarkshire, the ERDP Performance Framework is
closely aligned to the corporate Strategic Performance
Framework.
This framework aims to produce evidence that allows for
day‐to‐day activities, and progress towards improving
economic opportunities and outcomes for all to be
regularly monitored, reported, assessed, and scrutinised.
It will also enable performance issues against the ERDP’s
key priorities to be identified and addressed, mitigating the
risk of delivery failure.
The ERDP Performance Framework will be kept under
review to ensure arrangements remain effective and
aligned to future versions of the ERDP and The Plan for
North Lanarkshire.
Page 25 of 98

Page 26

ERDP Performance Framework
The three levels of performance indicators form an interrelated set, with operational measures supporting improvements to services and outcomes for
North Lanarkshire’s residents and businesses in the short, medium, and long‐term.
The three levels are summarised below: 
Level 1: The North Lanarkshire Economic Context
A suite of ‘state of the nation’ health check indicators which collectively provide the North Lanarkshire economic context.
These indicators are often at a macro level and out with the sole control of the Council. As such, these indicators do not have targets set against them,
instead they set out the intended direction of travel. This approach is consistent with The Plan for North Lanarkshire Strategic Performance Framework. The
ERDP framework uses 5 of the 28 indicators set out in the Strategic Performance Framework to assess the performance of the North Lanarkshire economy.
Data comes from national sources such as the Office for National Statistics (ONS) or Scottish Local Authority Economic Development (SLAED) Performance
Reports. As data is reported in a consistent manner nationally, North Lanarkshire can be benchmarked against Scotland and comparator authorities across
the Glasgow City Region. 
Level 2: Improving economic opportunities and outcomes for all
A suite of indicators and information to enable an assessment of progress towards our long‐term vision of improving economic opportunities and outcomes
for all.
When measuring outcomes there is often a delay in being able to demonstrate that outcomes have been achieved, or it may not be clear how much of a
change in an outcome can be attributed to NLC’s actions alone, or if external factors have influenced the outcome. Therefore, some of these indicators do
not have targets set against them but will instead be used for benchmarking purposes.
The group of performance indicators at all three levels in the ERDP Performance Framework therefore aims to collectively demonstrate improvements to
outcomes in the long‐term, while demonstrating effective use of resources in the short term (the latter through monitoring and measuring day to day
operations).
Page 26 of 98

Page 27

Level 3: Day to day operations
These performance indicators allow the quality, efficiency, and effectiveness of day‐to‐day operations to be assessed. They include targets in the short‐term
(current financial year), medium‐term, by the end of the current ERDP cycle (2027/28) and longer‐term (2035).
Targets are cumulative from the baseline onwards (not additional to previous target). For example, the 1,400 Open Market Purchase Scheme completions
by 2035 includes the 630 completions which have already been achieved by March 2023. Relevant teams across Place are identified against each indicator
to ensure accountability. The inclusion of input and output measures, and understanding how these lead to improved outcomes, will be an important factor
in determining the success of the Framework and Economic Regeneration Delivery Plan. 
ERDP Performance Framework: Level 1
The North Lanarkshire Economic Context
Indicator Baseline Latest
available
update
Measuring this
indicator will tell
us if we have…
What success
looks like
Intended
direction
of travel
Latest
direction of
travel
North Lanarkshire Commentary
Growth in Gross
Value Added
(GVA) (income
approach)
2016 
NL
+3.7% 
Scotland
+3.2%
2020 
NL
+0.3% 
Scotland
‐2.6%
Increased our
economic output
Continued
economic
growth in this
area   
The latest data shows a 0.3% increase in
NL from 2019 to 2020 which, although
smaller than previous years, is a more
positive position compared to nationally
where the % change shows a decline of
2.6% over the same period.     
The time lag in the availability of these
results means that the period covered by
this data does not yet reflect the impact
of the pandemic and, as such, will
continue to be monitored.
Page 27 of 98

Page 28

Gross weekly
pay (residents)
– full time
employees
2018 
NL
£548.90 
Scotland
£562.70
2022 
NL
£656.60 
Scotland
£640.30
Increased the
earnings of
people who live
in North
Lanarkshire
Earnings for
people who
live in NL
continue to
grow on a par
with national
levels   
The gross weekly pay for NL’s residents is
now higher than the average earnings for
both Scotland and GB for the first time
ever. 
In 2022, gross weekly earnings for NL’s
residents was £656.60 (based on all full‐
time workers); an increase of £63.90
from 2021 and £16.30 above the national
average.     
The 2022 figures represent over a 10%
increase in gross weekly earnings in NL
from 2021 compared to a 3% increase
nationally (i.e. an average increase of
£20.40 per week nationally).     
Traditionally, while wages have risen
steadily for the people who live in NL,
this had previously been at a lesser rate
than average earnings for Scotland and
GB.
% of all
economically
active in
employment (16‐
64 years)
Oct
2017/Sept
2018 
NL
77.8% 
Scotland
77.6%
Oct
2021/Sept
2022 
NL
68.9% 
Scotland
77.2%
Increased the
number of our
residents in
employment (or
actively seeking
employment)
More people
aged 16 to 64
living in NL are
economically
active and
contributing
to the local /
national
economy   
68.9% of NL’s working age population
were economically active as at
September 2022 which equates to
153,600 residents. This is a decrease
from the pre‐pandemic level in
September 2019 of 173,300. 
There are various factors which will
require to be investigated further in
terms of economic inactivity; of the
69,100 people currently recorded as
Page 28 of 98

Page 29

economically inactive, the latest figures
show that 19% are students, 14% are
looking after home/family, 10% are
retired, 41% are long‐term sick, with the
remainder classed as other. Of those
recorded as economically inactive, 84%
don’t want a job.
% of VAT/PAYE
registered
businesses that
survive for at
least three
years
2016 
NL
58.7% 
Scotland
62.1%
2021 
NL
58.1% 
Scotland
59.0%
Increased and
sustained our
new businesses
More locally
generated and
incoming
businesses
being created,
surviving and
sustaining in
the longer‐
term   
The latest business survival rates in NL
show an increase from 50.9% in 2020 to
58.1% in 2021. These results not only
follow the same trend as the national
average, they show an increase at a
greater rate. 
This represents an encouraging picture
given the results are still within the
period of the pandemic. It also shows
that rates in NL in 2021 have returned to
a similar level as the baseline for The
Plan for North Lanarkshire (58.7% in
2016).
% of working
age people (16‐
64) claiming one
or more of the
key benefits
Dec 2018 
NL
3.5% 
Scotland
2.8%
Dec 2022 
NL
3.3% 
Scotland
3.1%
Reduced the
number of our
residents reliant
on employment
related benefits
All of NLs
residents
capable of
working are
sustaining
employment   
The latest figure equates to 7,420 people
claiming work related benefits in NL as at
December 2022 ‐ a 6% decrease from the
December 2019 claimant count of 7,890
(pre‐pandemic levels). The latest figure
also represents a 47.7% decrease from
December 2020 (14,195), and a 22.5%
decrease from December 2021 (9,580).
Page 29 of 98

Page 30

ERDP Performance Framework: Level 2
Improving economic opportunities and outcomes for all 
Key
performance
indicator
What does this tell us? Baseline Short‐term
By first ERDP review
(31 March 2023)
Medium term
By next ERDP Review
(2027/28)
Long term
(By 31 March 2035)
Target Actual Target Target
Estimated
number of
construction
jobs (PYEs)
created
The number of gross construction jobs (PYEs)
created as a result of ERDP related investment
by NLC and our ALEOs across North Lanarkshire. 
Construction jobs created as a result of physical
regeneration projects occur during the
construction phase of the project only and do
not recur once the development is operational.
816 1,737 1,445 3,265 6,221 
Therefore, these figures are reported as Person
Year Equivalents (PYEs) rather than Full‐time
Equivalents (FTEs).     
Estimated
number of
gross full‐time
equivalents
(FTEs) created
The estimated number of gross jobs (FTEs)
created as a result of ERDP related investment
by NLC and our ALEOs across North Lanarkshire. 
The gross number of jobs created does not take
account of factors such as displacement. 
This measures the follow on impact generated
once the physical works have been completed
and the new infrastructure is being put to
economic use.
As these outcomes only occur once projects are operational,
there will be a delay in demonstrating this outcome has been
achieved. 
Therefore, this indicator has a long‐term target to 2035 only.
This indicator is
currently under
development to
ensure a robust
methodology for
target setting and
reporting progress
towards this.
Estimated
number of net
additional full‐
The estimated number of net jobs (FTEs)
created as a result of ERDP related investment
by NLC and our ALEOs across North Lanarkshire.
As these outcomes only occur once projects are operational,
there will be a delay in demonstrating this outcome has been
achieved.
This indicator is
currently under
development to
Page 30 of 98

Page 31

time
equivalents
(FTEs) created
Under this measure, the gross number of jobs
created is adjusted to better assess the true
extent of the likely impact of the ERDP on the
local labour market and economy. 
This measures the follow‐on impact generated
once the physical works have been completed
and the new infrastructure is being put to
economic use.
Therefore, this indicator has a long‐term target to 2035 only. ensure a robust
methodology for
target setting and
reporting progress
towards this.
Town centre
vacancy rates
‐ % of vacant
commercial
units as a % of
total units
across North
Lanarkshire’s
town centres.
This indicator measures the level of vacant units
within town centres. The ERDP aims to create
vibrant mixed‐use towns where people live,
work, shop, eat, and access local services. 
As such, recognition needs to be given to the
fact that vacancies may temporarily increase
where vacant possession of redundant retail
centres or land assembly is required to enable
transformative change.
18.9% 
Year:
2017/18
This measure will be used for benchmarking purposes only and
therefore no targets have been set. 
2021/22 ‐ Latest published data shows that North
Lanarkshire’s town centre vacancy rate was 18.7%, above the
Scottish average of 11.4% and approximately the same as measured in
2017/18.
% of
immediately
available
employment
land
The purpose of this measure is to contribute to
the assessment of how ‘investor ready’ North
Lanarkshire is in terms of providing the
necessary infrastructure for new and growing
businesses, including inward investment. 
Employment land includes any land that is
immediately available for business use, which
means it is fully serviced and marketed, as
opposed to simply designated for
employment/industrial use in the Local
Development Plan. The land is therefore
immediately available for business expansion or
relocation purposes.
65.7% 
Year:
2017/18
This measure will be used for benchmarking purposes only and
therefore no targets have been set. 
2021/22 ‐ Latest published data shows that 70.6% of North Lanarkshire’s
employment land was ‘immediately available’. This is significantly higher
than the Scottish average of 27.2% and slightly higher than levels
available in 2017/18. 
Given levels of developable land available, the council are currently
developing a Business & Industry Strategy for North Lanarkshire which
will aim to identify how council investment in such land should be
prioritised.
Page 31 of 98

Page 32

Commercial
planning
applications ‐
average time
(weeks) to
process
business and
industry
planning
applications
Planning applications are important in terms of
the future development and use of land across
our towns and communities. 
An efficient and well‐functioning planning
service plays an important role in facilitating
sustainable economic growth and delivering
high quality development in the right places. 
This indicator shows how long the council takes
to deliver commercial planning application
decisions (i.e., for a business and industry).
6.9 weeks 
Year:
2017/18
This measure will be used for benchmarking purposes only and
therefore no targets have been set. 
2021/22 – North Lanarkshire 12.6 weeks, compared to a Scottish
average of 11.7 weeks
Percentage of
premises able
to access
Superfast
Broadband
Digital infrastructure is one of the key gateways
to achieving inclusive growth and prosperity. By
improving our digital infrastructure, we will
connect North Lanarkshire to markets and
opportunities.
97.0% 
Year:
2017/18
This measure will be used for benchmarking purposes only.
2021/22 – North Lanarkshire – 98.6% / Scotland 94.1% 
NLC has a role alongside telecoms companies in
facilitating and enabling the development of
effective digital infrastructure.   
The required digital infrastructure speed
needed to have superfast broadband is
30Mbit/s.  
Carbon
Dioxide (CO2)
emissions per
capita
(tonnes)
Sustainability is one of the key principles which
underpins the ERDP. 
These estimates can assist us in understanding
our environmental impact and can be used to
inform our actions against climate change and
towards North Lanarkshire’s target of achieving
net zero emissions by 2030.
7.5t per
capita 
Year:
2014
This measure will be used for benchmarking purposes only.
2020 – North Lanarkshire 4.7 tCO2 / Scotland 4.6 tCO2
Page 32 of 98

Page 33

ERDP Performance Framework: Level 3
Day to day operations 
Priority 1: We will help deliver the homes North Lanarkshire needs to grow 
Why is this set of indicators of interest? The Plan for North Lanarkshire ambition statement alignment
This reflects the council’s commitment (through the Local Housing Strategy and
Programme of Work P013 ‐ New Supply Programme) to promote a supply of good
quality affordable housing across all tenures. 
This also supports the Strategic Housing Investment Plan (SHIP) which helps deliver
Local Housing Strategy priorities and maximise resources in the Affordable Housing
Supply Programme. 
The target to deliver 5,000 new homes by 2035, includes over 500 homes to be
acquired through the open market purchase scheme (an extension of the empty
homes purchase scheme). 
As a significant proportion of the council’s housing stock is within multi‐storey blocks,
the new supply programme is an integral part of the Programme of Work P014 ‐
Tower Strategy. 
The first phase of the re‐provisioning programme will potentially see all the council’s
tower blocks demolished, together with a number of low‐rise blocks of flats, over the
next 20 to 25 years.
1. Ensure a housing mix that supports social inclusion and
economic growth. 
2. Refocus our town centres and communities to be
multifunctional connected places which maximise social,
economic, and environmental opportunities.
Page 33 of 98

Page 34

Key
performance
indicator
What does this
tell us? 
Note: these figures are cumulative and not additional to each other Lead Team(s)
Baseline Short‐term Medium term Long term
By first ERDP review
(31 March 2023)
By 2023/24 By next ERDP
Review
(2027/28)
(By 31 March
2035)
Target Achieved Target Target Target
Number of new The number of 633 1,205 1,016 1,292 2,300 3,365 New Supply
build council new build       
house house Years:  Amber    
completions completions via 2010/11 –       
the council’s 2018/19       
New Supply       
Programme       
Number of The number of 133 689 630 705 1,055 1,635 New Supply
Open Market homes brought       
Purchase into Council Years:  Amber    
Scheme ownership, 2010/11 –      
completions including some 2018/19       
homes       
previously sold       
under the Right       
to Buy.       
Household The % of new 79% 89% 87% 90% 94% 96% New Supply
connectivity build housing       
capacity (via the New Years:  Amber     
Supply 2010/11 –       
Programme) 2018/19       
with high       
quality digital       
infrastructure       
capacity.       
Page 34 of 98

Page 35

High quality
digital
infrastructure
refers to a
property being
fibre
broadband or
5G enabled.       
Priority 1 Summary: 
Total number of indicators Number of indicators with ‘Green’
status
Number of indicators with ‘Amber’
status
Number of indicators with ‘Red’
status
3 0 3 0
Successes to date The New Supply Programme was introduced in 2010/11 and NLC has set an ambitious target of delivering 5,000
council homes by 2035. This will be achieved via a combination of new build, purchasing from the private sector
and buying existing homes via the Open Market Purchase Scheme. 
• 1,646 homes have been delivered via the New Supply Programme, as of 31 March 2023.
• The milestone 1,000th new build home was completed during 2022/23
• NLC’s first low carbon (net zero) homes completed at Dykehead Road, Airdrie. These homes feature air
source heat pump heating systems, battery storage and enhanced photovoltaic panels.
Challenges Various external factors such as the Covid‐19 pandemic, Brexit, the wider geopolitical environment, and rising
inflation across the UK economy have impacted construction and materials costs. 
The UK economy has also experienced a buoyant housing market, seeing house prices riding high since lockdown
restrictions eased in 2020. 
New build and open market purchases were slightly behind target as of March 2023. However, with over 400 units
currently on‐site and due to complete over the next year, the programme will have delivered circa. 2,000 units
between 2010 and 2024, in line with initial programme targets.
Page 35 of 98

Page 36

Priority 2: We will reshape and repopulate our town centres 
Why is this set of indicators of interest? The Plan for North Lanarkshire ambition statement alignment
A key priority within the Programme of Work, P018.1 ‐ Economic Regeneration
Delivery Plan (ERDP), is the regeneration of North Lanarkshire’s town centres and
their redevelopment as modern, high‐quality, mixed‐use spaces with a much stronger
focus on residential provision.
1. Ensure a housing mix that supports social inclusion and
economic growth. 
2. Refocus our town centres and communities to be
multifunctional connected places which maximise social,
economic, and environmental opportunities.
Key
performance
indicator
What does this
tell us? 
Note: these figures are cumulative and not additional to each other Lead Team(s)
Baseline Short‐term Medium term Long term
By first ERDP review
(31 March 2023)
By 2023/24 By next ERDP
Review
(2027/28)
(By 31 March
2035)
Target Achieved Target Target Target
Investment
made in town
centre
developments
The amount (£)
invested in
North
Lanarkshire’s
town centres to
enable sites to
be re‐purposed
or redeveloped.
This includes
NLC investment
and external
funding
sources.
£29.8M 
Year:
2010/11 –
2018/19
£83.96M £73.89M 
Amber
£96.2M £211.7M £272.1M Growth /
New Supply
External
funding secured
for town centre
The amount (£)
of external
funding
secured for
£9.26M 
Years:
£42.57M £32.0M 
Amber
£44.8M £93.0M £119.0M Growth/
New Supply
Page 36 of 98

Page 37

regeneration
projects
town centre
regeneration
projects in
North
Lanarkshire’s
town centres
2010/11 –
2018/19      
Number of
town centre
buildings
and/or sites re ‐
purposed or re
‐developed
The number of
existing
buildings or
vacant sites
within North
Lanarkshire’s
town centres,
which have
been re ‐
purposed or
redeveloped.
34 
Years:
2010/11 –
2018/19
57 58 
Green
60 75 90 Growth /
New Supply
Number of new
affordable
homes within
town centres
(or edge of
town)
The number of
units either
converted to
residential or
new build
house
completions via
the NL New
Supply
Programme,
NLC Growth
Programme
and SHIP within
North
Lanarkshire’s
town centres.
887 new
affordable
town centre
homes
completed 
Years:
2010/11 –
2018/19
1,492 1,663 
Green
1,715 2,171 2,560 New Supply /
RSLs / Growth
Page 37 of 98

Page 38

Edge of town is
defined as
within a 10 ‐
minute walk, as
per Sustrans
20‐minute
neighbourhood
definition       
Priority 2 Summary: 
Total number of indicators Number of indicators with ‘Green’
status
Number of indicators with ‘Amber’
status
Number of indicators with ‘Red’
status
4 2 2 0
Successes to date Reshaping and repopulating our town centres is a key objective of the ERDP. 
Since the ERDP was introduced in 2019, eight town visions have been developed for Airdrie, Bellshill, Coatbridge,
Cumbernauld, Kilsyth, Motherwell, Shotts and Wishaw. 
Town Action Plans have been developed for Airdrie, Motherwell and Wishaw so far, outlining the short, medium
and long‐term actions required to realise the visions for each town. It is anticipated that all 8 towns will have a
completed Town Action Plan by Summer 2024. 
Over £44million has been invested in towns between 2019‐2023, with key projects including: 
• Key town centre properties have been acquired, with plans to convert to residential developments. These
include the former YMCA building (Brandon Street, Motherwell), Motherwell Old Town Hall, Bank Street
and Main Street (Coatbridge), the former Masonic Hall (Hope Street, Motherwell), Kings House (Wishaw)
and the former Methodist Church (Wishaw).
• Enabling the regeneration of the Orrs building in Airdrie, due to complete in late 2023.
• Major improvements to community facilities such as Motherwell Library.
• A 2.3km Green Route, connecting Cumbernauld town centre with surrounding communities such as
Kildrum and Carbrain.
Page 38 of 98

Page 39

1,663 town centre homes have also been delivered via NLC and Registered Social Landlords (RSLs) as part of the
Strategic Housing Investment Plan (SHIP). This includes homes within a 10‐minute walk of town centres, in line
with the 20‐minute neighbourhood definition.
Challenges Various external factors such as the Covid‐19 pandemic, Brexit, the wider geopolitical environment, and rising
inflation across the UK economy have impacted construction and materials costs. 
However, progress continues towards reshaping and repopulating our town centres. NLC continues to engage with
property and landowners to acquire buildings/land which are strategically aligned with our redevelopment plans.
A key challenge is managing owner’s expectations around property/land value, ensuring best value is achieved. 
Although town centre investment targets were missed in 2022/23, this was largely due to delays in acquisition,
including the purchase of The Centre Cumbernauld (completed in June 2023 with £9.25m secured and spent via
the UK Government’s Levelling Up Fund). 
Priority 3: We will enable our people and businesses to thrive 
Why is this set of indicators of interest? The Plan for North Lanarkshire ambition statement alignment
Although North Lanarkshire has a significant amount of industrial land and premises,
some are not suitable for today’s needs. To enable our people and businesses to
thrive we’ll invest in business and industrial space and in marketing North Lanarkshire
as the place to invest and work.
2. Refocus our town centres and communities to be
multifunctional connected places which maximise social,
economic, and environmental opportunities. 
3. Maximise the use of our marketable land and assets through
improved development in business and industrial infrastructure. 
16. Transform our natural environment to support wellbeing and
inward investment and enhance it for current and future
generations.
Page 39 of 98

Page 40

Key
performance
indicator
What does this
tell us? 
Note: these figures are cumulative and not additional to each other Lead Team(s)
Baseline Short‐term Medium term Long term
By first ERDP review
(31 March 2023)
By 2023/24 By next ERDP
Review
(2027/28)
(By 31 March
2035)
Target Achieved Target Target Target
Investment
made
towards the
development of
business and
industrial
infrastructure
The amount (£)
invested in
business and
industry zoned
land or
upgraded to
existing
business and
industrial
infrastructure
across North
Lanarkshire.
This includes
NLC and ALEO
funding only.
£0.524M 
Year:
2018/19
£5.1M £2.852M 
Red
£4.19M £7.7M £14.9M Fusion Assets/
Growth
External/private
sector/loan
funding secured
for office and
industrial
development
The amount (£)
of external,
private or loan
funding
secured for
investment in
office and
industrial
developments
across North
Lanarkshire.
£1.3M 
Year:
2018/19
£17.6M £16.856M 
Amber
£21.7M £32.8M £40.4M Fusion Assets/
Growth
Page 40 of 98

Page 41

Ha of land
improved for
business and
industrial use
The amount
(Ha) of land
remediated or
improved for
business and
industry use
across North
Lanarkshire
3.61 ha 
Year:
2018/19
6.34 ha 7.74 ha
Green
9.5 ha 10.0 ha 11.73 ha Fusion Assets/
NLP/ Growth
Sq.ft of
commercial
workspace
created or
refurbished
The amount
(square
footage) of
commercial
workspace
created or
refurbished as
a result of
investment by
NLC, Fusion
Assets or North
Lanarkshire
Properties
across North
Lanarkshire.
18,000 sq.ft 
Year:
2018/19
117,410 sq.ft 117,410 sq.ft
Green
132,910
sq.ft
257,910 sq.ft 459,410 sq.ft Fusion Assets/
NLP/ Growth
Page 41 of 98

Page 42

Priority 3 Summary: 
Total number of indicators Number of indicators with ‘Green’
status
Number of indicators with ‘Amber’
status
Number of indicators with ‘Red’
status
4 2 1 1
Successes to date Since the introduction of the ERDP in 2019, almost an additional 100,000 sq.ft of commercial workspace has been
created, including 40,500 sq.ft at Gartcosh Industrial Park (buildings 2 and 3). 
11,410 sq.ft has been developed at Spruce Court within Orbiston Street Industrial Estate, Motherwell. This has
provided new start‐up units for SMEs as well as a unit for New College Lanarkshire students as part of an initiative
to support young entrepreneurs who are setting up a business within the area. 
Muir Construction have been appointed to deliver Fusion Assets new industrial flagship industrial building at Link
Park, Newhouse. The next phase of development will be a speculative 16,000 sq.ft industrial unit that will be net
zero carbon enabled. As part of the construction contract a community benefits clause has also been incorporated
which will see local school children and students from New College Lanarkshire gain work experience on site. 
NLC has also secured £1.9M from the Scottish Government’s Regeneration Capital Grant Fund which will
contribute to the significant redevelopment of Braidhurst Industrial Estate in Motherwell. This project will see the
upgrading of the existing units owned by North Lanarkshire Properties as well as the construction of industrial
units suited to local small‐medium sized enterprises (SMEs). 
Lastly, the council continue to receive ring‐fenced VDLF from the Scottish Government of circa. £1.8‐1.9M per year
(subject to the submission and approval of an annual VDLF Local Delivery Plan) and continue to focus this
investment towards the creation of new industrial and business space and ultimately new jobs.
Challenges Various external factors such as the Covid‐19 pandemic, Brexit, the wider geopolitical environment, and rising
inflation across the UK economy have impacted construction and materials costs. 
This has caused some delays to projects and investments made. However, there is still a clear commitment from
North Lanarkshire Council and Fusion Assets to invest in our business and industrial infrastructure with key
projects and enabling works in the pipeline such as Braidhurst Industrial Estate, Link Park Newhouse, Phase 3 & 4
of Gartcosh Industrial Park, Condor Park Eurocentral and Ravenscraig Business Land (plot 1).
Page 42 of 98

Page 43

Priority 4: We will connect North Lanarkshire 
Why is this set of indicators of interest? The Plan for North Lanarkshire ambition statement alignment
The Programme of Work P021 ‐ City Deal aims to increase Gross Value Added across
the entire Glasgow City Region by providing increased access to jobs through
improved connectivity to centres of employment and opening up development
opportunity. 
We will connect North Lanarkshire to markets and opportunities by improving our
strategic infrastructure.
2. Refocus our town centres and communities to be
multifunctional connected places which maximise social,
economic, and environmental opportunities. 
4. Market and promote North Lanarkshire as the place to live,
learn, work, invest, and visit. 
5. Grow and improve the sustainability and diversity of North
Lanarkshire’s economy 
16. Transform our natural environment to support wellbeing and
inward investment and enhance it for current and future
generations.
Key
performance
indicator
What does this
tell us? 
Note: these figures are cumulative and not additional to each other Lead Team(s)
Baseline Short‐term Medium term Long term
By first ERDP review
(31 March 2023)
By 2023/24 By next ERDP
Review
(2027/28)
(By 31 March
2035)
Target Achieved Target Target Target
Investment
made
in key
infrastructure
projects
(including City
Deal projects)
to date
The amount (£)
invested in key
infrastructure
projects
(including
investment
made in City
Deal projects to
date).
£6.8M 
Years:
2015/16 ‐
2018/19
£45.93M £42.34M 
Amber
£64.4M £163.1M £238.5M City Deal
Page 43 of 98

Page 44

This includes
NLC direct
investment and
Glasgow City
Region City
Deal funding.       
Number of key
infrastructure
contracts
completed
The number of
key Enterprise
Projects or City
Deal
infrastructure
contracts
completed. 
A long‐term
project can
contain
multiple
contracts.
3
Years:
2015/16 ‐
2018/19
8 7 
Amber
11 18 21 City Deal
Km of active
travel routes
created
The amount
(Km) of active
travel routes
created which
will improve
the ability of all
people to walk,
wheel and cycle
throughout
North
Lanarkshire. 
This will help
reduce
0 km 
Year:
2018/19
No target has
been
identified due
to a change in
this indicator
in 2023/24 to
ensure
reporting
aligns with
NLC’s Active
Travel
Strategy.
13.46 km 
No RAG status
determined as
no target to
compare
actual against. 
This refers to
7.8km
previously
delivered plus
an additional
5.66km
19.46km 50 km 125 km Infrastructure &
Transportation
Page 44 of 98

Page 45

inequalities by
providing
people with
more
opportunities
to access
employment,
local services,
education or
training.  
delivered in
2022/23.     
Priority 4 Summary: 
Total number of indicators Number of indicators with ‘Green’
status
Number of indicators with ‘Amber’
status
Number of indicators with ‘Red’
status
3
Note: 1 indicator has no RAG status
0 2 0
Successes to date The direct deliverable successes to March 2023 relate to business case approvals obtained; infrastructure delivery
completed or in progress; project development and delivery investment. 
The indirect deliverable successes to March 2023 relate to economic benefits realised; the impact of GCR City Deal
investment in addressing market failure and providing improved confidence to the market, people and businesses
to locate in North Lanarkshire. These successes are monitored through ongoing benefits monitoring data and
through evidence of market interest (through planning applications, proposal of application notices, commercial
enquiries). 
The following headline successes has been achieved since the commencement of the council’s City Deal
Infrastructure Investment Programme: 
• £38.48M City Deal Programme investment to March 2023 (project development and delivery)
• A further £3.86M of external funding secured and invested in other infrastructure projects to March 2023 to
support core City Deal projects.
Page 45 of 98

Page 46

• Seven infrastructure contracts delivered (City Deal contracts and other infrastructure contracts to support core
City Deal projects). 
Gartcosh/Glenboig Community Growth Area (CGA): 
• Gartcosh Business Park to Glenboig Link Road project delivered (comprising three works contracts).
• Benefits realisation has commenced as a result of the Glenboig Link Road project with housing developments
at Gartcosh/Glenboig CGA and Fusion Assets investment in commercial/industrial units at Gartcosh Business
Park. There has also been evidence of market interest (both residential and commercial) in the area.
Pan Lanarkshire Orbital Transport Corridor (Pan Lan): 
• Motherwell Station Park and Ride expansion project delivered.
• Muir Street Interchange works were underway during 2022/23 and completed in May 2023.
• Motherwell Station Active Travel Links Phase 1a delivered and detailed designs progressed for Phases 1b and
1c (with delivery planned for 2023 and 2024). 
• Ravenscraig Infrastructure Access (RIA) South: West Coast Mainline Crossing construction progressed over
2022/23 with the crossing guided into place under a closure of the rail line in April 2023. 
• East Airdrie Link Road (EALR) preferred alignment selected, ground investigation works completed and tender
for Stage 3 of the project prepared (to be issued Summer 2023). 
• Ravenscraig Active Travel Link Phase 1 completed with Phase 2 works nearing completion. 
A8/M8 Corridor Access Improvements: 
• Revised Outline Business Case for A8/M8 Corridor Access Improvements approved.
Challenges Over the last 3 years in particular, a variety of external factors and challenges have affected construction and
infrastructure activity which have impacted on project programmes and milestones:
Page 46 of 98

Page 47

Various external factors such as the Covid‐19 pandemic, Brexit, the war in Ukraine and rising inflation across the
UK economy have impacted construction and materials costs. Labour market and martial supply shortages have
also increased costs and put pressure on delivery timescales. 
Current market conditions have also impacted on contractor’s risk appetite and the value of tenders returned.
Due to the complex interdependencies between the delivery and design phases of projects within the City Deal
Programme, this has led to increases in design requirements, delivery timescales and costs and
project/programme risks identified. 
Internally, there has also been pressure on resource capacity with recruitment challenges for suitably qualified
staff over the last two years, with some vacancies remaining unfilled. This too has put pressure on delivery
programmes due to reduced capacity within the delivery team to take forward project development work. 
However, the following mitigation measures have been put in place or are in progress: 
• A review of delivery programmes and reprofiling to reduce risks where possible.
• Increased allowance and contingency for inflation within project budget profiling.
• Use of contract clauses which share the risk of inflation costs between the contractor and the client.
• Use of procurement frameworks and capability and capacity enquiries for services and works contracts.
• Partnership working with key project stakeholders to manage interface and interdependency risks.
• Project Team approach for East Airdrie Link Road established between Enterprise Project team and
Infrastructure and Transportation teams.
• Recruitment campaigns undertaken, with a new Project Development Co‐ordinator now appointed within the
Enterprise Projects team. 
Page 47 of 98

Page 48

Page 48 of 98

Page 49

North Lanarkshire Council Report 
Does this report require to be approved? ☒ Yes  ☐ No
Ref SHL/YW                       Date 01/09/23 
From Pamela Humphries, Chief Officer (Place) 
E-mail  weiry@northlan.gov.uk  Telephone
Yvonne Weir, Enterprise
Manager
07508 001238 
Executive Summary
This report provides update on the outputs and outcomes of Smart Hub Lanarkshire since
the project launched on 30 April 2021. It also details plans to continue a phase two delivery
programme from 1 September 2023 to 31 March 2025, utilising capital, and revenue grant
funding from the UK Shared Prosperity Fund (UKSPF). Smart Hub Lanarkshire was
established through funding awarded by the Advancing Manufacturing Challenge Fund
(AMCF), North Lanarkshire Council and in-kind contributions from New College
Lanarkshire which concluded on 30 June 2023.  The Hub facility has contributed to
advancing the productivity and manufacturing capabilities of Small to Medium-sized
Enterprises (SMEs) within North Lanarkshire and Scotland. 
Recommendations
It is recommended that the Enterprise and Fair Work Committee: 
(1) Acknowledge the outputs and outcomes delivered by Smart Hub Lanarkshire during
2021 to 2023. 
(2) Approve the proposal to commission and commence a phase two delivery project
up to 31 March 2025 funded from the Shared Prosperity Fund, subject to agreeing a
Business Plan and funding agreement with New College Lanarkshire. 
The Plan for North Lanarkshire
Priority Improve economic opportunities and outcomes
Ambition statement (5) Grow and improve the sustainability and diversity of North
Lanarkshire's economy 
Enterprise and Fair Work Committee
Smart Hub Lanarkshire – Phase 2 Funding (UKSPF)
Item 3
Page 49 of 98

Page 50

1. Background 
1.1 Smart Hub Lanarkshire (SHL) is an innovation asset housed within New College
Lanarkshire’s Motherwell campus. The Hub facility comprises: 
• A state-of-the art Robotics and Automation Training Facility.
• Dedicated space for manufacturing SMEs to meet, learn and
access industry-specific business support. 
1.2 The project was designed and developed jointly by North Lanarkshire Council (NLC)
and New College Lanarkshire (NCL). Through partnership with the University of
Strathclyde, SHL links with the National Manufacturing Institute Scotland (NMIS),
ensuring local manufacturing SMEs have access to sector-specific academic and
innovation-led support. 
1.3 SHL was 1 of 12 regional projects in Scotland to be awarded grant funding from the
competitive £15.8m Advancing Manufacturing Challenge Fund (AMCF) in April 2020.
This regional approach saw SHL commit to deliver support to manufacturing SMEs
based in the North Lanarkshire and surrounding Local Authority areas. 
1.4 With a total project value of £739,491.03, the SHL funding structure comprised: 
Project Costs  Total Cost
Funding Contributions
North
Lanarkshire
Council
New
College
Lanarkshire
AMCF
Digital Technology
& Project Resource £484,125.29 £193,650.12  £290,475.17
Smart Hub
Lanarkshire facility
fit out and two
part-time
members of staff
to support
marketing,
events, and
admin/reception
duties. 
£255,365.74    £255,365.74 
1.5 AMCF contract and grant award timing (9 April 2020) meant that SHL faced immediate
operating challenges including: 
• A 1-year delay to the project start date due to COVID requiring the closure of New
College Lanarkshire’s Ravenscraig Campus where the project is based.
• An initial 6-month period of SHL digital delivery due to restricted access to the
College campus / assets until November 2021.
• Inability to recruit or procure suitably experienced project management /
consultancy resource on a temporary basis.
Page 50 of 98

Page 51

1.6 As a result, Smart Hub Lanarkshire has operated with 1 FTE of ‘in kind’ NCL and
NLC staff resource. The following targets were delivered between 30 April 2021 and 30
June 2023: 
AMCF Output
Indicators
AMCF Target
9 April 2020 to 30
June 2023
SHL Actual
30 April 2021 to 30
June 2023
North
Lanarkshire
SMEs
SME Event
Attendance
345 361 106 (30%)
SMEs Supported
(7 Hours)
173 68 19 (28%)
SME Projects 86 25 8 (33%)
SME Research
Institute Collabs
43 6 0
SME Value of
Business
Expenditure on
Research &
Development
(BERD)
£287,688 £359,490 £109,810 (30%)
AMCF Outcome
Indicators   
SME New to
Market Products
14 1 0
SME New to Firm
Processes
43 24 10 (42%)
AMCF Additional
Output Indicators   
SME Robotic
Demos & Training
sessions
63 96 86 (90%)
Number of Cobot
Demonstration
Sessions to
Schools/Colleges
(started Aug 2022)
87 62 62 (100%)
SME Employee
Sign-ins to SHL
708 715 157 (22%)
NMIS Workstream
workshops
20 21 17 (81%) 
1.7 Outside of AMCF reporting, additional outputs resulted from the SHL project. These
included: 
• A total of 2,397 people registered and 1,985 engaged (83% uptake) with Smart Hub
Lanarkshire, which includes intermediaries (such as accountants, insurers, banks
etc.), North Lanarkshire-based school pupils and employees of large companies.
• SHL secured additional contract-based funding of £78,666 from the Scottish
Enterprise High Value Manufacturing Team to design and introduce an added layer
of support for manufacturing companies. The 12-month Cobot Trial pilot project
enabled 12 companies (of which 4 were from North Lanarkshire) to participate in
Page 51 of 98

Page 52

supported 2-week Cobot trials. Two participants have since invested in Cobots,
nine have stated intent to invest and one has further feasibility work to undertake. 
1.8  As a result of the AMCF grant award there is a 3-year contractual commitment to 30th
June 2026 for North Lanarkshire Council to provide annual reporting on SHL legacy
outputs, outcomes, and activities. The AMCF funded assets are also not able to be
commercially exploited or be used to generate revenue during this time. 
2. Report 
2.1 The UK Shared Prosperity Fund (UKSPF) is a UK Government-allocated fund which
has three core objectives to reduce inequalities between communities, aid people and
invest in their skills development, and support local businesses as part of the
Government’s wider Levelling up agenda. North Lanarkshire Councils UKSPF
Investment Plan and funding proposals were approved by the Enterprise, Growth and
Fair Work Committee on 29th August 2022. 
2.2 It is proposed that SHL will be delivered under the UKSPF Intervention S15 within the
Supporting Local Businesses Investment Theme. Specifically, the Smart Hub
Lanarkshire intervention will build on the success of Smart Hub Lanarkshire, to support
advanced manufacturing, robotics, and artificial intelligence (AI). The activity will invest
in further technology and support the ongoing capital and revenue costs of delivery to
support SMEs and engagement with schools and young people. 
2.3 Funding from the UKSPF will enable the continued delivery of the SHL service up to 31
March 2025. It also presents an opportunity to develop and evolve the offer, ensuring
North Lanarkshire-based manufacturers continue to benefit from local access to a
growing, tech-led, knowledge base and innovation asset. 
2.4 It is proposed to continue the successful partnership with New College Lanarkshire and
commission the College to deliver Phase 2 of SHL until 31st March 2025. Project
funding would comprise £280,000 to deliver the UKSPF outputs and outcomes detailed
in section 3.1 of this report. Specifically, this could encompass capital equipment (such
as cobot technology, virtual reality, augmented reality, and artificial intelligence-related
equipment) in addition to funding project-specific staff costs. 
2.5 New College Lanarkshire (NCL) will be responsible for the design and delivery of a
programme of technology focused business support for the North Lanarkshire
manufacturing sector. This will contribute to defined UKSPF Outputs and Outcomes
detailed in section 3.1 of this report. Support delivered will be non-financial and training
based. For businesses not based in North Lanarkshire there may be a fee levied for
accessing some Smart Hub Lanarkshire services. Fees will only be levied in
compliance with the AMCF funding conditions outlined in section 1.8 of this report. 
2.6 Non-financial support will enable the continuation of business support activity
established through the AMCF programme. It also presents an opportunity to develop
and innovate, ensuring the offer evolves and appeals to SHL’s existing and new target
manufacturing audience. Activities will include: 
• Robotic and technology demonstration events (Group and one to one)
• Thematic, sector focused events
• Business Support (3.5 Hrs / Half Day)
• Ongoing one-to-one project development support for businesses
• Introduction to Research / Partner Organisations Page 52 of 98

Page 53

2.7 Training (industry specific and technology-led) will include delegates from SMEs, large
businesses, schools, and further education as well as representatives from
intermediary organisations who will act as a conduit to the manufacturing sector. 
2.8 UKSPF funding requires focus on manufacturing businesses based within the North
Lanarkshire Council area. NCL will be commissioned to develop a service proposal that
prioritises North Lanarkshire-based manufacturers to ensure UKSPF Output and
Outcome targets are met. 
2.9 To ensure value for money and a quality service offer, as part of their Business Plan,
NCL will commit to meeting a number of requirements.  These include: 
i) Technology Investment – NCL to specify the proposed items of expenditure to
be included in capital budget spend (£100k) for approval 
ii) Branding and Marketing – NCL to develop and optimise the SHL brand and
associated marketing channels through the project duration. 
iii) Resource Allocation - NCL to provide a detailed people and time specification
for the resource that will work in and on the project. 
iv) In-Kind Contribution - NCL will require to document and commit £140k of in-
kind value to the project 
v) NCL will participate in monthly planning meetings to monitor project progress.
A quarterly meeting will enable NCL to report on KPIs against target. 
3.   Measures of success 
3.1   New College Lanarkshire will work to deliver defined Outputs and Outcomes over the
1.5-year commissioned contract term from September 2023 to March 2025: 
Total SHL Target
Outputs 
Number of businesses receiving non-financial support 140
Number of people attending training (inc. school
pupils)
400
Outcomes 
Number of enterprises adopting new or improved
products or services
5
Organisations engaged in new knowledge transfer
activity
6
Businesses adopting new to the firm technology or
processes
14 
Page 53 of 98

Page 54

4. Supporting documentation 
4.1 None. 
Pamela Humphries
Chief Officer (Place) 
Page 54 of 98

Page 55

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts been discussed and agreed with
Finance?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
North Lanarkshire has received an allocation of £13,871,047 from the UK Shared
Prosperity Fund (UKSPF) including £300,000 to support the business support
activity set out in this report.
5.3 HR policy impact
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact
Does the report / project / practice contain or involve the processing of personal
data?
Yes ☒ No ☐
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☒
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk
Yes ☐ No ☐ 
Page 55 of 98

Page 56

5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact   
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
There is a risk that if the college fails to deliver on the contract this could result in
an underspend in UKSPF funds. Regular monthly contract meetings will be
undertaken with the college to monitor and evaluate progress. In addition, it may be
possible for the council to reprofile spend towards other UKSPF projects should the
contract underperform.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 56 of 98

Page 57

Re-appointment of Category B Director Routes to Work
North Lanarkshire Council
Report 
Does this report require to be approved? ☒ Yes  ☐ No
Ref JO’N/PK                       Date 01/09/23 
From Janie O’Neill, Chief Officer (Education-South)
E-mail oneillja@northlan.gov.uk Telephone 
Executive Summary
This report concerns the re-appointment of a Category B director to Routes to Work Limited
(RTW) who is reaching the three-year limit on their appointment by the Council and are
willing to be re-appointed. 
Recommendations
It is recommended that the Enterprise & Fair Work Committee: 
(1) Approve the re-appointment of the Category B director, referred to in section 2.2,
to the Board of Directors of Routes to Work Limited. 
The Plan for North Lanarkshire
Priority Improve economic opportunities and outcomes 
Ambition statement
(11) Increase economic opportunities for adults by understanding,
identifying, and addressing the causes of poverty and deprivation
and barriers to financial inclusion
Enterprise & Fair Work Committee
Item 4
Page 57 of 98

Page 58

1. Background 
1.1 Routes to Work’s Board of Directors consists of up to ten members – two are Category
A members appointed by North Lanarkshire Council (one is an elected member, and
one is a senior Council officer) and up to eight Category B directors, who bring specialist
expertise to the company and are selected through a formal nominations procedure. 
1.2 The Board of Directors is responsible for ensuring that Routes to Work’s services are
delivered in accordance with approved Service Level Agreements and charitable
objectives. The Board meets quarterly to fulfil its governance responsibilities which
include operational delivery and management, staffing, financial control and reporting,
health and safety, performance monitoring and reporting and risk management. There
are three formal sub-groups of the Board that meet regularly: Governance, HR, and
Finance. 
2. Report 
2.1 Provisions of Articles of Association 
2.1.1 The Articles of Association of Routes to Work Limited include the following provisions
in respect of the composition of the Board of Directors and the appointment of
Independent Directors: 
50.1 A maximum of 8 directors shall be Category B Directors who shall be appointed
(after due consideration of the views of the board of directors) on the basis that: 
50.1.1 they are representative of the community within the Operating Area; and/or 
50.1.2 they have specialist skills or expertise which would be of assistance to the
board. 
64 Each office shall be held until the conclusion of the final meeting of the board of
directors which is held within the third financial year which follows the date of
appointment of an individual to the relevant office; a director whose period of office
expires under this article may be re-appointed to that office under article 62 (providing
he/she is willing to act). 
2.1.2 Under the terms of Article 55 the Council may appoint any Category B Director (other
than an officer, elected member or employee of the Council) in writing and signed by
an appropriate officer with the guidance of the company’s nominations sub-committee. 
2.1.3 The re-appointment of the Category B Director listed below has been discussed and
agreed at Routes to Work Ltd and it was agreed that the Council be approached to
secure the necessary approval for this re-appointment. The director seeking re-
appointment is: 
Professor Christopher Moore, Principal and Chief Executive of New College
Lanarkshire 
2.1.4 The independent director proposed for re-appointment has clear expertise within areas
that can support Routes to Work Ltd. A short profile of the proposed independent
director for re-appointment is included in Appendix 1. 
Page 58 of 98

Page 59

3. Measures of success 
3.1 Routes to Work Limited continues to utilise the experience and support of its
independent directors. 
4. Supporting documentation 
4.1 Appendix 1 - Profile of Category B Director Proposed for Re-appointment to Routes
to Work Limited Board. 
Janie O’Neill
Chief Officer (Education - South)
Page 59 of 98

Page 60

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
If Yes, have all relevant financial impacts been discussed and agreed with
Finance?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact
Does the report / project / practice contain or involve the processing of personal
data?
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk
Yes ☐ No ☐
5.6   Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Yes   ☐ No ☒
If Yes, please provide a brief summary of the impact?
Page 60 of 98

Page 61

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact   
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 61 of 98

Page 62

APPENDIX 1
Profile of Category B Director Proposed for Re-appointment to Routes to Work
Limited Board:
Professor Christopher Moore
Professor Moore has held the role of Principal and Chief Executive of New College
Lanarkshire since 2019 and has 22 years of academic leadership experience.   Prior to joining
New College Lanarkshire, he was senior deputy vice chancellor at York St John University.  
As well as leadership in education, Professor Moore comes from a business management
background, with a PhD in marketing. Having lived in Lanarkshire most of his life, Professor
Moore is passionate about developing opportunities and advancing the educational,
economic, social and cultural prospects of the region.  He has been a member of the Routes
to Work Board for three years.
Since being established in 2002 the Principal of New College Lanarkshire has always been
invited to play a role on the Routes to Work Board and this reflects the clear links between
reducing unemployment and skills development. 
Page 62 of 98

Page 63

North Lanarkshire Council     
Report 
Does this report require to be approved?              ☐ Yes  ☒ No
Ref PH/DG                 Date 01/09/23 
From Pamela Humphries, Chief Officer (Place) 
E-mail greerd@northlan.gov.uk Telephone   
Executive Summary 
In accordance with the Council’s Financial Regulations, any variations where the outturn / expected
costs exceed the tendered contract price by the higher of £25,000 or 5% should be reported by the
appropriate budget holder to the relevant spending committee. 
The purpose of this report is to inform committee of a variation in costs against tender
contract price incurred on two projects undertaken by the Growth Team. 
Recommendations 
It is recommended that the Enterprise and Fair Work Committee: 
(1) Note the action taken to respond to additional issues identified, remedial action taken
and the subsequent variation in costs as a result. 
The Plan for North Lanarkshire
Priority Improve the health and wellbeing of our communities
Ambition statement (19) Improve engagement with communities and develop their
capacity to help themselves 
Enterprise and Fair Work Committee
Contract Variation – Allotment Projects
Item 5
Page 63 of 98

Page 64

1. Background 
Hillrigg Allotments
1.1 The works contract for Hillrigg Allotments was awarded to Caley Construction Ltd on the
10 February 2021 to create an allotment site on an area of Council owned Vacant and
Derelict land at Hillrigg, Wattston. 
1.2 Located in Wattston (a small former mining village located between Airdrie and
Coatbridge), this 0.91-hectare derelict land site showed evidence of historic mining
activity and, as such, was put on North Lanarkshire’s V&DL register in 1988. 
1.3 Building on the success of the previous Vacant and Derelict Land Fund (VDLF)
supported community allotments and gardens project at Viewpark and Mossend, (which
have been able to effectively engage local communities in the remediation and
constructive reuse of these derelict land sites), the council made use of VDLF through
its 2019/20 Programme to support the establishment of community allotments/gardens at
Hillrigg and enable the productive re-use of this plot for community ‘growing’ space. 
1.4 As with the successful projects at Viewpark and Mossend, rather than basing the design
of this facility on traditional allotments scheme, this has instead been founded on a more
European model for such provision, developing individual plots within a community
garden setting with communal greenspace, orchards and wildflower areas. 
1.5 The works to construct 19 allotment plots including additional raised beds, installation of
a community cabin, orchard, polytunnel, community garden and resurfaced car park were
awarded to Caley Construction Ltd for £282,138.28 and were completed in December
2021. 
Airdriehead Allotments 
1.6 The works contract for Airdriehead Allotments to create 39 allotment plots including
additional raised beds, installation of a community cabin, orchard, polytunnel and
community garden was awarded to P1 Solutions on the 12 November 2021 to create a
community allotment on an area of Council owned land located within Cumbernauld
Community Park. 
1.7 The tender contract value was £234,886.00. The works were jointly funded by Campsie
Ltd, Cumbernauld and the Scottish Government’s Place Based Investment Programme. 
1.8 The works commenced in March 2022 and were completed in February 2023. 
1.9 The overall costs for delivering both of these projects exceeded the original agreed
contract sum due to various reasons which were not apparent at the outset of the project. 
2. Report 
Hillrigg Allotments 
2.1 The major issues encountered on this project which resulted in additional costs
included, but were not limited to:- 
• Discovery of asbestos contamination within the soil resulting in excavation and
removal of contaminated soil;
• Additional costs due to remediation of a larger area of land due to asbestos
Page 64 of 98

Page 65

contamination;
• Enhanced remediation of ground due to soil contaminants including arsenic and
zinc;
• Additional costs due to drainage issues caused by broken field pipes 
2.2 A Site Investigation was undertaken at spot points across the site during the design
stage. Testing of the samples did not uncover the asbestos contamination or the
widespread nature of the other contaminants. As the site was to be used for food
growing a greater amount of remediation had to be undertaken at significant additional
cost. 
2.3 During construction, the existing field drains were discovered to be broken causing
issues with drainage across the site. Additional drainage had to be installed to alleviate
potential flooding issues. 
Airdriehead Allotments 
2.4 The major issues encountered on this project which resulted in additional costs included,
but were not limited to:- 
• Additional costs due to changes in the design and specification of the proposed
community hub resulted in gas monitoring works being undertaken. There were
areas of historic shallow coal mining identified during the initial site investigation and
the community building was identified as a potential loading risk on ground that could
hold pockets of harmful gas.
• Due to an extension of the allotment drainage system following the discovery of
areas of non-porous ground conditions once works had commenced.
• Additional costs relating to Scottish Water requirements to relocate water
connections to the site.
• Additional costs due to the realignment of the site boundary following discussions
with Scottish Water. 
• The items of additional work also resulted in the overall programme increasing and
contributed to the cost increase. 
2.5 Both of these projects are now complete. Details of the increases for the individual
projects are listed in Appendix 1. 
2.6 Any future growing projects on brownfield sites may benefit from an increased site
investigation works at closer spot points to try and mitigate any failure to identify
contamination issues. 
3. Measures of success 
3.1 Provision of two allotment sites, providing a total of 58 allotment plots (Hillrigg 19 plots,
Airdriehead 39 plots) to be operated and managed by community groups. 
Page 65 of 98

Page 66

4. Supporting documentation 
Appendix 1 - Detail of Project Costs 
Pamela Humphries Chief
Officer (Place) 
Page 66 of 98

Page 67

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Project overspend has been financed through the Scottish Government’s Vacant
and Derelict Land Fund and Placed Based Investment Programme.
5.3 HR policy impact
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact
Does the report / project / practice contain or involve the processing of personal
data?
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk
Yes ☐ No ☐
5.6   Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Yes   ☐ No ☒ Page 67 of 98

Page 68

If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)?
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
The two projects have created community led allotment sites for the growing of
food. The Hillrigg project also dealt with a large area of ground contamination which
has been removed and remediated.
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.9 Risk impact
Is there a risk impact?
Yes ☐ No ☒
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed?
5.10 Armed Forces Covenant Duty
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)?
Yes ☐ No ☒
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out?
Yes ☐ No ☒
Page 68 of 98

Page 69

Appendix 1 – Detail of Project Costs 
Project Contract Sum Estimated Final
Account
Difference Main Reasons for Additional
Costs
Hillrigg Allotments £282,138.28 £455,193.58 £173,055.30 Additional costs in relation to a
number of ground
contaminants (including
asbestos, arsenic and zinc).
Additional costs in relation to
increased area of land
remediation.
Additional costs in relation to
drainage issues.
Airdriehead Allotments £234,866.00 £341,954.43 £107,088.43 Additional costs in relation to 
gas monitoring site
investigation works.
Additional costs in relation to
drainage issues and Scottish
Water additional works. 
Page 69 of 98

Page 70

Page 70 of 98

Page 71

North Lanarkshire Council
Report 
Does this report require to be approved? ☐ Yes ☒ No
Ref: PH/DG Date: 01/09/23 
From Pamela Humphries, Chief Officer (Place) 
E-mail Greerd@northlan.gov.uk Telephone: 
David Greer, Growth
Programme Manager,
07583 059816 
Executive Summary 
The Committee is asked to acknowledge the award of contracts for Asset Management services and
Property Management services at The Centre Cumbernauld (the ‘Agreement(s)’). 
As the Agreements are within the thresholds stated within condition 21.2 of the councils General
Contract Standing Orders (GCSO’s), the Chief Officer (Place) approved the award of Agreements
on 30 June 2023. The Agreements were procured via a “Negotiated Tender Procedure” (as per
sections 2.2 – 2.4 below) with the detail of this report required to be submitted to Committee in
accordance with GCSO 9.5. 
The Agreements are for an initial period of nine (9) months that commenced on 01 July 2023. The
council reserves the right to extend the Agreements for additional periods up to a maximum of a
further three (3) months. 
Recommendations 
It is recommended that Enterprise & Fair Work Committee acknowledges the award of Agreements
for: 
(1) Asset Management services at The Centre Cumbernauld to HKI Partnership LLP and Belgate
Estates Limited at the value of Ninety Thousand Pounds Sterling (£90,000.00) exclusive of
VAT; and
(2) Property Management services at The Centre Cumbernauld to Gatehouse Property
Management Limited at the value of One Hundred and Fifty Thousand Pounds Sterling
(£150,000.00) exclusive of VAT. 
The Plan for North Lanarkshire 
Priority Improve economic opportunities and outcomes 
Ambition Statement (2) Refocus our town centres and communities to be multi-functional
connected places which maximise social, economic, and environmental
opportunities 
Enterprise and Fair Work Committee
Transforming Places: 
Contract Award for The Centre Cumbernauld Asset Management and
Property Management
Item 6
Page 71 of 98

Page 72

1. Background 
1.1 Cumbernauld is North Lanarkshire's largest town. It now has an opportunity to redefine itself
as a '21st Century new town' and further develop its commercial, industrial and retail role as
a sustainable, green and low-carbon regional hub. The Vision for Cumbernauld will be built
around a transformed low-carbon town centre defining Cumbernauld as a hub for services,
education, shopping and leisure, expressed by a new restructured mixed-use centre situated
within a greenspace and parkland setting that supports active travel and leisure. The town
centre will become a vibrant, mixed-use, welcoming, safe and resilient place where people
are supported at all stages of their lives, where they can live and socialise and where
businesses can thrive. 
1.2 To achieve the vision for Cumbernauld, the council completed the property acquisition of The
Centre Cumbernauld (TCC) on 30 June 2023 from its previous owners. To enable TCC to
continue operating as a viable shopping destination in the short term, the council was
required to ensure that appropriate management arrangements were in situ prior to the
purchase of TCC. The management of TCC is split over two areas as detailed below: 
• The Asset Manager’s role is to optimise the commercial viability of TCC during the
transition period by actively managing the leases on behalf of the council; and 
• The Property Manager’s role is to collect rental and service charges from leaseholders
on behalf of the council whilst also being responsible for TCC’s operation i.e. cleaning,
security, repairs, maintenance etc 
1.3 In March 2022, the Policy and Strategy Committee approved (where possible), to continue
existing service provisions following the acquisition of TCC in order to minimise disruption
and enable a degree of continuity for the leaseholders, customers and supply chain in regard
to communication, operations, processes etc. 
1.4 The Agreements were therefore subject to “novation” from HAMCAP (Cumbernauld) LLP
(previous owners of TCC) to the council. As such, only minor amendments could be made to
the historical terms and conditions of the Agreements and changes made were only to ensure
compliance with the council’s public sector duties. 
1.5 Each Agreement has a maximum duration of 12 months. Work has already started by the
project team to procure and implement longer term management arrangements for TCC
following the expiry of the Agreements within this report. The new management
arrangements will be subject to competition and shall be procured in accordance with
applicable procurement legislation and the council’s General Contract Standing Orders. 
1.6 The requirements of the Agreements have never been contracted before by the council
therefore historical information, data etc. is not available. 
2. Report 
2.1 A group of technical and procurement representatives was formed to develop and agree the
procurement strategy for the Agreement to enable the council to achieve maximum benefit
for the requirements. 
2.2 Given the novation approach, the procurement of the Agreements was undertaken as
independent Negotiated Tender Procedures (NTP). The estimated value of each
Agreementdictated that each procurement procedure be undertaken in accordance
with the Procurement (Scotland) Regulations 2016 (the “Regulation(s)”). 
2.3 Justification for use of the NTP for both of the Agreements was made under Regulation
6(1)(b) “A contracting authority may award a public contract without seeking offers in relation
to the proposed contract where the works, supplies or services can be supplied only by a
particular economic operator where competition is absent for technical reasons but only, in
the case where no reasonable alternative or substitute exists, and the absence of competition
Page 72 of 98

Page 73

is not the result of an artificial narrowing down of the parameters of the procurement”.
Following advice from the Chief Officer (Asset and Procurement) and the Chief Officer (Legal
and Democratic), the Chief Officer (Place) approved the progression of both NTP’s on 21
April 2022. 
2.4 Following the justification detailed and appraised within the associated NTP strategy
documents, the NTP procedures are considered to demonstrate Best Value as the absence
of required service provision within the Agreements could impact the commercial viability of
TCC following its purchase. The appointed contractors have long established relationships
with TCC’s leaseholders, customers, staff, supply chain etc. which should enable a degree
of continuity for TCC’s operation. 
2.5 A summary of the procurement procedure is provided in Appendix 1. 
Financial / Budget Consideration 
2.6 The whole life budget for both Agreements is £240,000.00. 
2.7 The costs associated with delivery of the Agreements will be made via rental and service
charges collected from TCC leaseholders. 
Price Stability 
2.8 Costs and prices within both Agreements are fixed and unchangeable for their entire duration. 
Community Benefits 
2.9 The Agreements do not include a community benefit requirement due to their short duration,
the council’s inability to substantially change the historical terms and conditions of the
Agreements given the novation approach applied, and onus on developing a longer term
management strategy for TCC. 
Fair Work First 
2.10 Contractors appointed to each Agreement shall ensure staff identified to deliver required
service provision are treated fairly in accordance with the Scottish Governments “Fair Work
First” policy.
Page 73 of 98

Page 74

Contract Management 
2.11 Officers from the Growth Team, Place with externally appointed advisors Avison Young (UK)
Limited will be responsible for managing the Agreements which will be undertaken in
accordance with the applied contract and supplier management approach within the
Agreements. 
3. Measures of success 
The Agreements will deliver the following outcomes; 
3.1 Best Value has been considered to be demonstrated as per section 2.4 above; 
3.2 the appointment of contracts who have the experience and capability to deliver required
services; and 
3.3 the procurement procedures are compliant with the procurement legislation and internal
procedures. 
4. Supporting documents 
Appendix 1 Summary of Procurement Process 
Pamela Humphries
Chief Officer (Place) 
Page 74 of 98

Page 75

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☐ No ☒
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts been discussed and agreed with Finance?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
The costs associated with delivery of the agreements will be made via rental and service
charges collected from TCC leaseholders
5.3 HR policy impact
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts been discussed and agreed with People Resources?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact
Does the report / project / practice contain or involve the processing of personal data?
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☒
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-mailed
to dataprotection@northlan.gov.uk
Yes ☐ No ☐
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
Page 75 of 98

Page 76

Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)?
Yes ☐ No ☒
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts, highlighting
where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk
Registers), and how they are managed? 
Failure to appoint AM and PM for overall management of the Centre creates high risk for
service disruption and prevents a degree of continuity for the leaseholders and customers
in regard to communication, operations, processes etc. 
This is covered within the project risk register.
5.10 Armed Forces Covenant Duty
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does
it relate to healthcare, housing, or education services for in-Service or ex-Service
personnel, or their families, or widow(er)s)?
Yes ☐ No ☒
If Yes, please provide a brief summary of the provision which has been made to ensure
there has been appropriate consideration of the particular needs of the Armed Forces
community to make sure that they do not face disadvantage compared to other citizens in
the provision of public services.
5.11 Children’s rights and wellbeing impact
Does the report contain any information regarding any council activity, service delivery,
policy, or plan that has an impact on children and young people up to the age of 18, or on
a specific group of these?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles from the
United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been carried
out?
Yes ☐ No ☒
Page 76 of 98

Page 77

Appendix 1 – Summary of Procurement Process 
Asset Management Property Management
Procurement Procedure Utilised: Negotiated Tender Procedure (NTP)
CPT Contract Reference Allocated: NLC-CPT-21-155 NLC-CPT-21-156
Governing Legislation / Regulations: Procurement (Scotland) Regulations 2016
Regulation Number NTP Justified Under: Regulation 6(1)(b)
Date NTP Strategy Fully Approved: 21 April 2022
Number of Tenders Received: One
Start Date of the Agreement: 01 July 2023
Total Agreement Period (Months): Twelve – Nine (9) + Three (3)
Awarded Value of the Agreement: £90,000.00 £150,000.00 
Appointed Contractor Name(s) HKI Partnership LLP
Belgate Estates Limited  Gatehouse Property Management Limited
Size of Organisations Medium
Locations Glasgow City 
Page 77 of 98

Page 78

Page 78 of 98

Page 79

North Lanarkshire Council
Report 
Does this report require to be approved?    ☐ Yes ☒ No
Ref: PH / DG     Date: 01/09/23 
From Pamela Humphries, Chief Officer (Place) 
E-mail greerd@northlan.gov.uk Telephone 
David Greer, Growth
Programme Manager
07583 059816 
Executive Summary 
This report is to advise the Enterprise and Fair Work Committee (the “Committee”) of the decision
taken in accordance with condition 21.3.2 of the Council’s General Contract Standing Orders
(GCSO’s) where, outwith the committee cycle, the Depute Chief Executive approved the award of a
contract for Braidhurst Industrial Estate Works Contractor (the ‘Contract’) to Tilbury Douglas
Construction Ltd. 
The Contract was approved by the Depute Chief Executive on 13 August 2023 and was formally
awarded on 18 August 2023. The Contract is for a period of 24 months and commenced on 28
August 2023.   
The value of the Contract shall not exceed five million eight hundred and sixty one thousand, nine
hundred and eighty nine pounds sterling (£5,861,989) exclusive of VAT. 
Recommendations 
It is recommended that Enterprise and Fair Work Committee: 
(1)  Notes the award of the Contract in accordance with GCSO 21.3.2 to Tilbury Douglas
Construction Limited to the maximum value of five million eight hundred and sixty one thousand,
nine hundred and eighty nine pounds sterling (£5,861,989) exclusive of VAT. 
The Plan for North Lanarkshire 
Priority Improve economic opportunities and outcomes 
Ambition Statement (3) Maximise the use of our marketable land and assets through improved
development in business and industrial infrastructure 
Enterprise and Fair Work Committee
Transforming Places
Contract Award for Braidhurst Industrial Estate Works Contract
Item 7
Page 79 of 98

Page 80

1. Background 
1.1 Located in Forgewood, North Motherwell, Braidhurst is a 4.5Ha, 1960s industrial estate which
is in a poor condition. It has poor and ageing infrastructure and its industrial units are now
coming to the end of their useful lifespan. A large part (more than one acre) of the site is
vacant and derelict. Despite this, Braidhurst continues to trade reasonably well with most of
the units owner-occupied or let, however, without significant investment there is no viable
long-term future for the estate and its current condition belies Braidhurst’s potential as a
modern, low-carbon industrial estate which supports start-ups and SMEs and which sustains
skilled jobs in the local economy. The aims of the project are:- 
• Create 10 new, net zero ‘incubator’ units providing affordable premises for start-ups,
micro-businesses and social enterprises. Energy and heat demand met by on-site
generation.
• Providing two of these units, rent-free, to community services/organisations
• Refurbishing six outdated industrial units owned by North Lanarkshire Properties (NLP),
extending the life of this existing infrastructure (saving embodied carbon) and investing
in their energy efficiency to reduce heat demand and carbon usage
• Completely overhauling and upgrading Braidhurst’s infrastructure including roads,
footpaths, drainage, lighting and the estate’s boundary (including the former Eagle Inn
public house site), significantly improving environmental and operational quality and
reducing carbon
• Improving car parking provision, enabling investment in the former B&Q unit at the front
of estate (this unit has been purchased by a biotech business which has plans to
redevelop the building and create up to 75 jobs)
• Installing new infrastructure to ensure that businesses can connect to high-speed
broadband
• Installing EV charging infrastructure which will allow businesses at Braidhurst to
decarbonise their fleet and encourage workers to adopt electric vehicle use 
1.2 In total, this project will directly create 960m2 new industrial space (bringing a 0.44Ha vacant
and derelict site back into use) and 27.6 new FTE jobs while supporting 16 PYE construction
jobs. In refurbishing 760m2 of existing industrial space and improving the entire estate it will
also help safeguard 80 existing jobs at Braidhurst. 
1.3 An initial feasibility study for Braidhurst Industrial Estate was commissioned in 2019 to identify
the key elements for a regeneration project, the potential costs and an outline programme. 
1.4 This information was utilised to inform an external funding application to the Scottish
Government’s Regeneration Capital Grant Fund (RCGF) in 2020. 
1.5 The initial application to the RCGF was rejected in early 2021 and feedback was sought from
the Scottish Government. This enabled specific areas of the application to be improved upon
and the revised enhanced application was subsequently submitted in late 2021. 
1.6 The revised application was approved in early 2022 with an award of £1.8m towards a total
project cost of circa £6.5m. It was initially a requirement of the award that the project be
“contractually committed” by the 31 March 2023. 
1.7 However, following further discussions with the Scottish Government in March 2023, it was
agreed that the contractor would be contractually committed as soon as possible in 2023/24. 
Page 80 of 98

Page 81

1.8 An additional award of £100,000 was allocated to the project. This provides an overall RCGF
grant contribution of £1.9m. The remaining funding has been achieved through £1.3M in
Place Based Investment Programme monies from the Scottish Government, NLC
contribution of £2.8M in Ambition funding and £600,000 is being contributed from North
Lanarkshire Properties. 
1.9 The appointment of a works contractor has been undertaken by using the Crown Commercial
Services framework. Tilbury Douglas Construction Ltd were assessed to be the preferred
contractor following a thorough assessment process. 
1.10 The procurement of the works contractor followed an approval by the Head of Planning and
Regeneration (now Chief Officer (Place)) on 27 May 2022 to commence procurement,
following agreement of the procurement strategy and funding approach. 
2. Report 
2.1 Following confirmation of the RCGF award, an internal user intelligence group (the ‘UIG’) of
technical and procurement representatives was formed following the confirmation of the
RCGF monies to review technical specifications, discuss trading processes, market
conditions and trends, ways to maximise community benefits and sustainability and to agree
the procurement strategy that would deliver maximum benefit for the Council via the Contract. 
2.2 The feasibility study had provided an initial estimated value of the Contract which detailed
that the procurement procedure would require to be undertaken in accordance with the Public
Contracts (Scotland) Regulations 2015. 
2.3 However, the timescales involved in a procurement process at this level would take a number
of months and would prevent the project from being “contractually committed” resulting in
the loss of the RCGF monies (as understood at that particular time). 
2.4 Therefore, for the reasons outlined above, an appointment from an appropriate Framework
was considered to be the best approach in order to meet the Scottish Government funding
deadlines. 
2.5 Following consideration, the UIG identified the Crown Commercial Services (CCS)
Framework as being the most appropriate framework to use. The procurement procedure
was therefore undertaken as a “Direct Award” from the CCS Construction Works and
Associated Services (RM6088) Lot 2.4 – Scotland framework agreement (the “Framework”). 
2.6 Companies appointed to the Framework were invited to declare their interest in the Project
with all interested parties invited to complete a questionnaire to assist the Council in
identifying a contractor to be appointed via a direct award from the Framework. 
2.7 Of the thirteen companies on the Framework, two returned a completed questionnaire which
were evaluated by three independent assessors and Tilbury Douglas Construction Ltd were
identified as the preferred contractor. 
2.8 A scope of works was produced and issued to Tilbury Douglas Construction Ltd for pricing
for the required services as outlined in points 1.1 to 1.8 above. The requirements of this
Contract have never been contracted by the Council before therefore exact historical contract
information was not available for consideration.   
2.9 However, the submitted tender was evaluated and confirmed overall as representing the most
economically advantageous tender for this Contract. 
Page 81 of 98

Page 82

2.10 Appendix 1 confirms the scoring achieved by Tilbury Douglas Construction Limited within the
CCS Framework, further details of the procurement procedure is provided in Appendix 2 and
the SME status and location of the tenderer is located within Appendix 3. 
2.11 The value of the Contract is five million eight hundred and sixty one thousand, nine hundred
and eighty nine pounds sterling (£5,861,989) exclusive of VAT. 
2.12 The costs associated with contract delivery will be contained within the council’s capital
programme budget allocation for Place, the Scottish Government’s Place Based Investment
Programme and a contribution from North Lanarkshire Properties. The RCGF monies will be
expended on the works. 
Price Savings / Increases 
2.13 No savings are anticipated within the Contract. 
2.14 The Contract value is determined by the Framework fees and are calculated on the works
contract value. The works contract value for this project is £5.8m and the Framework band
that this project falls within is from £3m-£10m. 
Price Stability 
2.15 The prices are based current market valuation and will be fixed for the duration of the project. 
Community Benefits 
2.16 Tilbury Douglas Construction Limited have a requirement to provide 14 Community Benefits
points through this contract. The final community benefits offering is currently being
negotiated but Tilbury Douglas have already agreed to undertake various initiatives at
Braidhurst High School in conjunction with the design team led by Collective Architecture 
Fair Work First 
2.17 Within their tender submission, Tilbury Douglas Construction Limited advised that they will
commit to the Scottish Government’s “Fair Work First” initiative. 
Contract Strategy 
2.18 Officers from the Growth Team will be responsible for managing the Contract which will be
undertaken in accordance with the Councils agreed approach to contract and supplier
management. 
3. Measures of success 
3.1 The Contract will enable the delivery of the following outcomes: 
• Upgrade of Braidhurst Industrial Estate including the construction of 10 new start up
industrial units;
• upgrade of six existing North Lanarkshire Properties industrial units;
• provision of new car park with EV charging points;
• improved infrastructure including road and footpaths; and
• lighting, drainage and installation of high-speed fibre broadband to improve the
economic viability of this industrial estate on the edge of Motherwell town centre. 
Page 82 of 98

Page 83

4. Supporting documents 
4.1  Appendix 1 Summary of Tender Evaluation Process 
4.2 Appendix 2 Summary of Procurement Process 
4.3 Appendix 3 SME Status and Location of Tenderer 
Pamela Humphries
Chief Officer (Place) 
Page 83 of 98

Page 84

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Supporting Local Business
North Lanarkshire has lower levels of entrepreneurship than Scotland and UK on
average. Around 5.4% of people in employment in North Lanarkshire are classed as
self-employed. That’s about 8,100 individuals self-employed. This is significantly
lower than the Scottish rate of 10.3% and UK average of 12.4%. North Lanarkshire
requires a further 10,300 people to move into self-employment in order to level up to
the UK average. This project will provide 10 new start-up units which lend themselves
to use by new enterprises. 
Vacant and Derelict Land
North Lanarkshire has the largest area of Vacant and Derelict Land across
Scotland’s 32 local authorities with 1,354 hectares across 500 sites in 2021. This
represents a 14% share of the Scottish total. This project will remove 0.5 hectares of
Vacant and Derelict Land from the register. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts been discussed and agreed with
Finance?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
The project will require funding from North Lanarkshire Council and North
Lanarkshire Properties. The funding streams for both NLC and NLP have been
identified and secured and approval for spend has been obtained. The remainder of
the funding will come from the Scottish Government via the Regeneration Capital
Grant Fund, which was awarded in January 2022, and the Place Based Investment
Programme.
5.3 HR policy impact
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? Page 84 of 98

Page 85

Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact
Does the report / project / practice contain or involve the processing of personal
data?
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk
Yes ☐ No ☐
5.6   Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Yes   ☒ No ☐
If Yes, please provide a brief summary of the impact? 
The project will include the installation of high-speed fibre broadband to the
Industrial Estate which will help to secure the financial viability of the businesses on
the estate by future proofing the infrastructure improvements. 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)?
Yes ☐ No ☒
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The proposed upgrade works include an element to reduce carbon emissions by
insulating the existing six North Lanarkshire Properties industrial units, and the
provision of solar panels, smart lighting and low energy technology in the ten new
start up units being constructed. EV charging points will also be installed on the
estate.
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Page 85 of 98

Page 86

The Scottish Government’s Regeneration Capital Grant Funding and Place Based
Investment Programme have conditions attached that the works contractor must be
contractually committed in order for the Council to be able to draw down funding. 
This is recorded within the project risk register. We are on target to meet this funding
requirement.
5.10 Armed Forces Covenant Duty
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)?
Yes ☐ No ☒
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out?
Yes ☐ No ☐
Page 86 of 98

Page 87

Appendix 1 – Summary of Tender Evaluation Process 
Final
Rank  Tenderer Name
Total
Tender
Score (%)
Recommended
for Contract
Award (Y / N)
1 Tilbury Douglas Construction Limited 94.63% Y
Page 87 of 98

Page 88

Appendix 2 – Summary of Procurement Process 
Response
Procurement Procedure Utilised: Framework (Crown Commercial
Services)
Governing Legislation / Regulations: Public Contracts (Scotland) Regulations
2015
Date Contract Strategy Approved: 27 May 2022
Date Contract Notice Published: Not Applicable
Number of Companies Invited to Take Part: 1
SME % of Expressions of Interest: 0%
NLC Based % of Expressions of Interest: 0%
Tender Return Deadline: 10 March 2023
Number of Tenders Received: 1
Where Only One Tender Is Received, Why?: Direct Award Call-off from Framework
Tenders Received from SME’s: 0
Tenders Received from NLC Based Tenderers: 0
Number of Non−compliant Tenders: 0
Number of Compliant Tenders: 1
Number of Recommended Tenderers: 1
Basis of Contract Award: Quality: 75% Price: 25% 
Evaluation Team:
Framework Scoring was utilised with
compliance checks etc. undertaken by
Officers of the Growth Team.
Anticipated Contract Start Date: 28 August 2023
Total Contract Period (Months): 24 months
Maximum Total Contract Value: £5,861,989
Page 88 of 98

Page 89

Appendix 3 – SME Status and location of all Tenderers 
Name of Tenderer
Size of Tendering
Organisation
(Micro, Small,
Medium or Large)
Location
(Local Authority /
Council Area) 
Tilbury Douglas Construction Ltd  Large  West Lothian 
Page 89 of 98

Page 90

Page 90 of 98

Page 91

07939 281102
North Lanarkshire Council
Report 
Does this report require to be approved? ☐ Yes  ☒ No
Ref BF/JMcK Date 01/09/23 
From Chief Officer (Assets and Procurement)
Email mckinstryj@northlan.gov.uk Telephone James McKinstry 
Executive Summary 
This report notifies the Committee of the contracts awarded between 1 April 2023 to 30
June 2023. It sets out those contracts awarded with a value below the financial threshold
requiring Committee approval. 
Recommendations 
It is recommended that the Enterprise and Fair Work Committee: 
(1)  are advised of the Contracts awarded below Committee approval threshold between
1 April 2023 to 30 June 2023 as per the process within the Council’s General
Contract Standing Orders. 
The Plan for North Lanarkshire 
Priority Improve the health and wellbeing of our communities
Ambition statement (17) Ensure we keep our environment clean, safe, and attractive 
Enterprise and Fair Work Committee
Contracts awarded below Committee approval threshold
Item 8
Page 91 of 98

Page 92

1. Background 
1.1 The Councils General Contract Standing Orders (the ‘GCSOs’) outline financial
approval thresholds for contracts for goods, works and services. Contract awards
above £500,000 for Supplies and Services and above £2,000,000 for Works require
approval by the Committee. These contract awards are considered by the Committee
on a case-by-case basis. 
1.2 Where the value of a contract award is between £50,000 and £500,000 for Supplies
and Services and between £500,000 and £2,000,000 for Works, GCSOs require that
the Chief Officer of Assets and Procurement award these contracts on behalf of the
appropriate Chief Officer.t 
1.3 The Chief Officer of Assets and Procurement is required to notify Committee on a
regular basis of any such contracts awarded on behalf of Procuring Service Areas 
2. Report 
2.1 The GCSOs require that contracts in excess of £500,000 for supplies and services and
£2,000,000 for works are approved, on a case-by-case basis, by the Committee before
award. 
2.2 The GCSOs require that contracts with a value above £50,000 but less than £500,000
for Supplies and Services and above £500,000 but less than £2,000,000 for Works are
awarded by the Chief Officer of Assets and Procurement on behalf of the appropriate
Chief Officer. 
2.3 The contracts awarded by the Chief Officer of Assets and Procurement that are under
the £500,000 Committee financial approval threshold for Supplies and Services and
£2,000,000 for Works in the period from 1 April 2023 to 30 June 2023 are detailed in
Appendix 1.
3. Measures of success 
3.1 Contracts support the delivery of Council and service priorities. 
3.2 Appointment of contractors who have suitable experience and capability to deliver the
required supplies, services or works. 
3.3 Contracts awarded by the Council are compliant with GCSOs and procurement
legislation. 
3.4 The Council’s Contract Register is kept updated by services and management
information is comprehensive and accurate. 
3.5 Best Value is both demonstrable and achieved.
4. Supporting documentation 
4.1 Appendix 1 - Summary of contracts awarded. 
James McKinstry
Chief Officer (Assets and Procurement)  Page 92 of 98

Page 93

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts been discussed and agreed with
Finance?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Where Financial impacts have been identified, they have been established and
addressed in each specific Contract Strategy and incorporated into the project. 
The Council’s Procurement Strategy proposes methods of maximising the delivery
of procurement benefits that could bring improved financial return to the Council
and the areas wider economy. Certain benefits have a monetary value attached
and these will be monitored on a project-by-project basis.
5.3 HR policy impact
Does the report contain any HR policy or procedure impacts?
Yes ☒ No ☐
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Where HR impacts have been identified, they have been established and
addressed in each specific Contract Strategy and incorporated into the project. 
Contracts awarded by the Council are compliant with GCSOs and procurement
legislation.
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☒ No ☐
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Where Legal impacts have been identified, they have been established and
addressed in each specific Contract Strategy and incorporated into the project.
Page 93 of 98

Page 94

Contracts awarded by the Council are compliant with GCSOs and procurement
legislation.
5.5 Data protection impact
Does the report / project / practice contain or involve the processing of personal
data?
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☒
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk
Yes ☐ No ☐
5.6   Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Yes   ☒ No ☐
If Yes, please provide a brief summary of the impact? 
All contracts listed have been assessed by the Enterprise Architecture Governance
Group (EAGG). 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)?
Yes ☒ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Sustainable procurement is one of the key objectives of the Council’s Procurement
Strategy and will have a positive impact, including, embedding sustainable
procurement as business as usual and incorporating community benefits into the
Councils contracts. Supporting local businesses and SMEs through closer working
with colleagues in the Council’s Enterprise department and by making our
processes more streamlined and accessible.
Where Environmental/Carbon impacts have been identified, they have been
established and addressed in each specific Contract Strategy and incorporated into
the project.
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
Page 94 of 98

Page 95

If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Where Risk impacts have been identified, they have been established and
addressed in each specific Contract Strategy and incorporated into the project. 
Contract award procedures may be susceptible to legal challenge if they are not
discharged in accordance with GCSO and procurement legislation.
5.10 Armed Forces Covenant Duty
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)?
Yes ☐ No ☒
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out?
Yes ☐ No ☐
Page 95 of 98

Page 96

APPENDIX 1 – SUMMARY OF BELOW THRESHOLD CONTRACT AWARDS 
Contract Description Contract
Award
Date
Contract
Start
Date
Contract
End Date
Contract
Extension
Contract
Value (inc
extension) 
(£s)
Successful Tenderer Supplies
Services
Works
No of
Tenders 
Received 
Route*
School Walking Routes 12/05/2023 15/05/2023 31/03/2024 31/03/2025 £99,882.32 Atkins Ltd Services 1 *DAF3 
Business Support and Expert
Help Services 2023 – 2025  02/06/2023  03/07/2023  31/03/2025  N/A  £460,000.00
Become Interactive Ltd,
Brett Nicholls Associates Ltd,
CJM Project Financial Management Ltd,
Concept HR Solutions,
GAP Communications,
Glasgow Chamber of Commerce,
Inspirent Ltd,
Intend Business Development Ltd,
J&G3 Ltd,
KL Business Consulting Ltd,
Mabbett & Associates Ltd,
Managed IT Experts Ltd,
MJM Associates (Scotland) Ltd,
Morrow Associates Ltd,
NSDesign Ltd,
Optimum Business Growth Ltd,
Russell McLeod Ltd,
SBP (Scotland) Ltd T/A SBP Creative,
Secure Business Advisors Ltd,
Solutions on Demand Ltd,
Stirton Consulting Ltd,
TheMacDogFactory Ltd,
Tinto Procurement,
Where Now Consulting Ltd 
Services  39  CO 
*Direct Award from the Scotland Excel Engineering & Consultancy Services Multi-Supplier Framework, Lot 2 - Traffic & Transportation Services
to best value provider.
Key – Procurement Route
Page 96 of 98

Page 97

CO - Contract Open Procedure
CR - Contract Restricted Procedure
FO - Framework Open Procedure
FR - Framework Restricted Procedure
FMCC - Mini Comp Council Framework
FMC3 - Mini Comp 3rd Party Framework
DAFC - Direct Award Council Framework
DAF3 - Direct Award 3rd Party Framework
DAH&SC - Direct Award Health & Social Care Related Services
N - Negotiated Contract
EXT - Extension to Contract/Framework 
Page 97 of 98

Page 98

Page 98 of 98