Page 1

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    PH/DG Date 17/02/23 
Programme of Work PO18.1 - Economic Regeneration Delivery
Plan 2023-2028 
From  Pamela Humphries, Chief Officer of Place  
E-mail Greerd@northlan.gov.uk Telephone
David Greer, Growth
Programme Manager:
07583059816 
Executive Summary 
The purpose of this report is to seek approval for North Lanarkshire’s refreshed Economic
Regeneration Delivery Plan (ERDP) 2023-2028 and associated annual ERDP Action Plan
for 2023/24. 
The ERDP is a high-level economic development framework which is aligned to the
composite capital programme and delivers on the first priority of The Plan for North
Lanarkshire – improving economic outcomes and opportunities for all. 
The 2023-28 refreshed ERDP replaces the previous ERDP which was approved by
Enterprise and Growth Committee in August 2019 and covered the timeframe 2019-2023. 
As with the previous ERDP, the refreshed ERDP aims to ensure that the council continues
to focus on investment in physical regeneration across four inter-related themes: 
• developing housing that promotes improved quality of life and creates a better place
to live;
• reshaping our town centres to ensure that these provide modern and attractive
centres that meet the needs of our communities;
• improving our business and industrial infrastructure, creating opportunities for
investment and for companies to start-up or relocate here; and
• continuing to improve our connectivity and develop new opportunities by
transforming our road, rail and digital infrastructure 
A 2023/24 ERDP Action Plan has also been developed and is included within the
supporting documents of this report. As throughout the delivery of the 2019-23 ERDP, this
action plan will be subject to annual monitoring, review and update.

Page 2

1. Background 
1.1 In August 2019, the Enterprise and Growth Committee approved North Lanarkshire’s
Economic Regeneration Delivery Plan (ERDP) covering the period 2019-2023. 
1.2 The ERDP was developed based on significant consultation and engagement with
stakeholders including elected members, North Lanarkshire residents, businesses,
council officers, and key partner organisations and was developed to help co-ordinate
the physical regeneration of North Lanarkshire, ultimately aimed at growing the North
Lanarkshire economy and improving economic opportunities and outcomes for all. 
1.3 Since 2019, an annual ERDP Action Plan has been approved by committee each year
detailing key milestones and targets for the financial year ahead. In 2022 a wider
Economic Performance Framework was also approved by committee which details
progress against short, medium and longer-term economic targets. 
1.4 Since the inception of the ERDP, several significant milestones have been achieved
through the delivery of the New Supply, Growth and City Deal programmes. This has
been previously communicated to committee in annual progress updates. Another
performance report will be presented to committee in Cycle 3 2023, detailing progress
against the 2022/23 ERDP Action Plan and wider Economic Performance Framework. 
1.5 As the initial ERDP only covered the period between 2019-23, a refresh has been
necessary to ensure that this plan remains fit for purpose. 
Recommendations
It is recommended that committee: 
1. Approve the refreshed ERDP (2023-2028) and Action Plan (2023/24) which are
attached to this report as appendices. 
2. Note that the approved ERDP and Action Plan will be subject to final review and
consultation. 
3. Note that an annual performance report detailing progress against the 2022/23
Action Plan and wider ERDP Performance Framework will be presented to
committee in Cycle 3 2023. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (1) Ensure a housing mix that supports social inclusion and
economic growth 
(2) Refocus our town centres and communities to be multi-
functional connected places which maximise social, economic, and
environmental opportunities 
(3) Maximise the use of our marketable land and assets through
improved development in business and industrial infrastructure 
(4) Market and promote North Lanarkshire as the place to live,
learn, work, invest, and visit 
(5) Grow and improve the sustainability and diversity of North
Lanarkshire's economy

Page 3

1.6 Due to the significant scale of ambition in North Lanarkshire, many of the existing ERDP
themes focus on longer-term programmes of work which will continue well beyond
2023. Moreover, internal stakeholder engagement has concluded that the revised
ERDP (2023-2028) should be a light touch refresh as we continue to progress our key
investments in housing, town centres, business and industry, roads, active travel and
digital infrastructure. 
2. Report 
2.1 Economic Regeneration Delivery Plan 2023-2028 
2.1.1 The refreshed ERDP continues to focus on the same four key inter-related themes as
the 2019-23 plan: 
• developing housing that promotes improved quality of life and creates a better place
to live;
• reshaping our town centres to ensure that these provide modern and attractive
centres that meet the needs of our communities;
• improving our business and industrial infrastructure, creating opportunities for
investment and for companies to start-up or relocate here; and
• continuing to improve our connectivity and develop new opportunities by
transforming our road, rail and digital infrastructure 
2.1.2 Our work in these areas will also be underpinned by several key policies and strategies
ultimately aimed at improving economic opportunities and outcomes for those who live,
learn and work in North Lanarkshire. These include: 
• North Lanarkshire’s Equality Strategy;
• The Workforce for the Future Strategy (and future updates);
• The Place, The Vision;
• Climate Plan, Action on Climate Together 2030; and
• The council’s Digital and IT Strategy.
2.2  Housing
2.2.1 Housing plays a key role in the health and wellbeing of North Lanarkshire’s people and
economy. Increasing housing supply and choice across all tenures will attract
investment, create jobs and reduce inequality.
2.2.2 To help deliver the homes that North Lanarkshire needs to grow over the next five
years, the revised ERDP recommends that the council will: 
• continue to focus investment in the council’s affordable housing stock to make sure
that the target of 5,000 new council homes for North Lanarkshire is reached by
2035;
• continue to support the delivery of the affordable housing programme including
intermediate tenures such as mid-market rent;
• enable private sector housing development to support the regeneration of strategic
sites such as Ravenscraig.

Page 4

2.3 Town Centres
2.3.1 Town Centres are vital for our sense of community and place and their attractiveness
and quality is strongly interlinked with the image and success of North Lanarkshire. 
2.3.2 North Lanarkshire has eight recognised town centres: Airdrie, Bellshill, Coatbridge,
Cumbernauld, Kilsyth, Motherwell, Shotts and Wishaw. Each town has its own
distinctive features and distinct mix of cultural, leisure and retail facilities.
2.3.3 To help reshape our town centres to ensure that these provide modern and attractive
centres that meet the needs of our communities over the next five years, the refreshed
ERDP recommends that the council will: 
• establish and commence delivery of town action plans for all eight town centres
(aligned with our approved town visions), agreeing short, medium and long-term
investment plans for each;
• continue to prioritise funding and secure external investment for the regeneration
of our town centres;
• review how the council can be more effective in addressing failing buildings in our
town centres, including potential use of Compulsory Purchase Orders where
required. 
2.4 Business and Industry 
2.4.1 North Lanarkshire has one of Scotland’s fastest growing economies and has huge
potential for future growth. To realise this potential, we need to enable our people and
businesses to thrive by continuing to invest in skills, in business and industrial space
and in marketing North Lanarkshire as the place to invest and work.
2.4.2 To help improve our business and industrial infrastructure and attract new investment
and employment, the refreshed ERDP will be supported through the delivery of a new
Business and Industry Strategy for North Lanarkshire. 
2.4.3 The revised ERDP also recommends that the council and our arms-length external
organisations (ALEOs) will focus on activities over the next five years which: 
• promotes a mix of development across our motorway corridors and accessible
business locations to support the development of our foundational economy as well
a high-end growth;
• continues to support enabling investment which brings our vacant and derelict land
and brownfield sites into commercial use;
• improves how we record and respond to enquiries from businesses to provide a co-
ordinated approach across relevant council services to help attract, retain and
expand businesses and employment opportunities; 
• builds upon work which supports innovation and skill development though the
development of sectoral learning academies; and
• supports investment, via our ALEOs, that will continue to improve, modernise and
expand commercial stock availability across North Lanarkshire. 
2.4.4 Added to these activities, it is also intended to undertake a full review of sites allocated
for business and industry within the current Local Development Plan (LDP) to inform
the preparation of the next LDP and ensure that we have suitable sites available to
attract and retain businesses and employment opportunities.

Page 5

2.5 Connectivity
2.5.1 Our existing roads, railways and digital infrastructure provide gateways to inclusive
growth and prosperity but there remains a need to better connect North Lanarkshire to
markets and employment opportunities by improving our strategic infrastructure.
2.5.2 To help improve our connectivity, the refreshed ERDP recommends that over the next
five years, the council will:
• continue to deliver the City Deal programme;
• ensure that inclusive economic growth remains at the heart of opportunity to support
affordable and accessible transport systems (via the Local Transport Strategy due
to be launched in 2024); 
• invest in the delivery of the council’s Active Travel Strategy to ensure a
comprehensive connection of active travel routes to key places across North
Lanarkshire;
• support the delivery of Electric Vehicle Charging infrastructure across North
Lanarkshire; and
• work with the council’s digital partner to install and invest in infrastructure that helps
create one of the best and most affordable/accessible digital provisions in the UK. 
2.6 ERDP Action Plan 
2.6.1 An action plan for 2023/24 has been devised to help progress delivery of the priorities
set out in the refreshed ERDP. This and future ERDP action plans will continue to be
subject to annual review, update and committee approval. This will allow for changes
to be made in response to any changing or arising challenges and opportunities facing
the North Lanarkshire economy at any given time. 
2.6.2 Whilst the ERDP 2023-2028 will remain a longer-term high-level framework for the
North Lanarkshire economy, the 2023/24 Action Plan outlines key targets and
objectives for the year ahead. 
2.6.3 The action plan will be delivered through the ERDP Steering Group (which comprises
key officers from contributing services across the council) and monitored through the
ERDP Board (which comprises senior officers across key services). 
2.7 Consultation and Briefings 
2.7.1 Following approval by committee, the finalised ERDP refresh will be subject to final
review (and potential minor amendment) by relevant services and wider stakeholders.
Once complete, an online briefing session on the finalised 2023-28 will be organised
for all members. 
3. Measures of success 
3.1  The annual ERDP Action Plan contains various targets, the delivery of such being key
to the success of the refreshed ERDP. 
3.2  A robust Economic Performance Framework has now also been established and
contains a series of key performance indicators, with short, medium, and long-term
targets attached as the operational measures of success. The next end-year
performance report is due to be presented to committee in Cycle 3 2023. This will
include progress against the 2022/23 ERDP Action Plan as previously approved by
committee.

Page 6

4. Supporting documentation 
Appendix 1 Economic Regeneration Delivery Plan (2023-2028) 
Appendix 2 ERDP Action Plan 2023/24 
Pamela Humphries
Chief Officer of Place

Page 7

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes x No ☐ 
If Yes, please provide a brief summary of the impact?  
The primary aim of the refreshed ERDP 2023-28 is to support inclusive economic
growth and opportunities for all. In doing so it aims to support investment in
creating a more equitable and fairer place for residents of North Lanarkshire to live. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The 2019-23 ERDP was funded through a mixture and a range of external funding
sources. It is envisaged that the 2023-28 ERDP will largely be funded in a similar
manner subject to available resources. 
An investment plan will be developed for the 2023-28 ERDP and opportunity will be
sought to use available funding for enabling works to try to help secure private
sector investment for proposals delivered through the ERDP. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?

Page 8

Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The ERDP remains one of the council’s key strategies and will be promoted
accordingly through Corporate Comms and digital platforms. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Risks are recorded and managed within Corporate Risk Register. Key risk is failure
to deliver on ERDP and its objectives of helping co-ordinate physical and economic
regeneration activity across North Lanarkshire, increasing economic output and
helping address social and economic inequality. This would result in the loss of
economic and social benefits to residents and business across North Lanarkshire
and significant reputational damage to the Council given the widespread public
nature of the programme. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒

Page 9

If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.

Page 10

Appendix 1
Economic
Regeneration
Delivery Plan 
2023-2028

Page 11

Foreword 
North Lanarkshire’s first Economic Regeneration Delivery Plan (ERDP) was launched in September
2019. The main focus of the plan was to help secure and direct capital investment in order to promote
inclusive economic growth, ensure community well-being and create a more prosperous place for
residents of North Lanarkshire to live. 
North Lanarkshire continues to be one of the fastest growing economies in Scotland. With our central
location, developing markets across construction, biotechnology, rail transportation and logistics,
North Lanarkshire has continued to re-profile its economy over the last decade. However, recent years
have thrown up many challenges with the economic impact of Brexit, Covid-19 and more lately the
cost-of-living crisis. 
To address this, North Lanarkshire needs to ensure that we are the best placed location in Scotland to
encourage investment, ensure that we have the homes and places where people want to live and the
digital and physical connectivity that attracts business and new opportunity. 
North Lanarkshire’s refreshed ERDP 2023-2028 builds upon the activity that the council and its
partners have been putting in place over the last 4 years. North Lanarkshire has consistently met
targets set out in previous annual ERDP Action Plans. However, the ERDP cannot be delivered as a
discrete strategy. It needs to be aligned with wider strategies for regeneration, digital, local housing
and investment. 
It needs to support our plans for net zero carbon emissions and environmental sustainability as well
as growth, whilst ensuring our communities have access to fair and equitable economic and
employment opportunities. 
Ayeshah Khan 
Convener, Enterprise and Fair Work Committee

Page 12

Introduction 
The North Lanarkshire ERDP sets out a high-level framework for improving economic opportunities
and outcomes for all. The 2019-23 ERDP (which the 2023-28 ERDP replaces) aimed to do this by trying
to direct capital investment towards four key goals: 
• developing housing that promotes improved quality of life and creates a better place to live;
• reshaping our town centres to ensure that these provide modern and attractive centres that
meet the needs of our communities;
• improving our business and industrial infrastructure, creating opportunities for investment
and for companies to start-up and relocate here; and
• continuing to improve our connectivity and develop new opportunities by transforming our
road, rail and digital infrastructure 
This framework was designed to focus activities and resources towards large-scale regeneration and
investment projects throughout North Lanarkshire. Nevertheless, since 2020, these goals to a certain
extent have been affected by wider economic issues and the global coronavirus pandemic. 
However, due to the significant scale of the planned investment and ambition in North Lanarkshire,
the previous ERDP themes were very focused on longer-term programmes of work which will continue
well beyond 2023. As such, internal stakeholder engagement has concluded that the refreshed ERDP
(2023-2028) should be a light touch refresh of the previous plan. This will allow the council to continue
to progress our key investments in housing, town centres, business and industry, roads, active travel
and digital infrastructure, whilst also at the same time being able to better reflect the current economic
environment. 
The core themes of the 2023-2028 ERDP will also continue to be underpinned by several principles
including skills, net zero and digital connectivity. This will be done by ensuring that the ERDP is aligned
to a number of key North Lanarkshire policies, strategies and plans which are already in place: 
• NLC’s Equality Strategy
• Workforce for the Future Strategy
• The Place, The Vision
• Climate Plan, Action on Climate Together 2030
• Digital and IT Strategy  
The 2023-2028 ERDP will continue to be supported by annual ERDP Action Plans which set out our
main objectives and targets related to physical infrastructure investments.  Action Plans will continue
to be subject to annual review and committee approval. This will allow for changes to be made in
response to any changing or arising challenges and opportunities facing the North Lanarkshire
economy at any given time. 
An Economic Performance Framework (EPF) was also developed in 2021 to try to measure the
economic outcomes of the ERDP and other associated activity being delivered through the council and
their partners. This framework contains a series of key performance indicators with short, medium and
long-term targets. The EPF will remain in place and annual performance reports will be presented to
North Lanarkshire Council’s Enterprise and Fair Work Committee.

Page 13

Key Strategic Links 
The Plan for North Lanarkshire sets the direction for the council and its partners. Its purpose is to
communicate our shared priorities and provide a focus for activities and resources. It is a high-level
strategic document that outlines a long-term vision for North Lanarkshire - a vision where North
Lanarkshire is the place to Live, Learn, Work, Invest, and Visit. 
The Plan for North Lanarkshire is underpinned by a number of strategies and plans which are closely
interlinked with the ERDP. As such, activity delivered through the ERDP annual action plans will aim,
where possible, to support the following: 
Equality Strategy
North Lanarkshire’s Equality Strategy focusses on furthering the council’s ‘We Aspire’ ambitions and
priorities. It recognises that the poverty, disadvantage and inequalities that exist for some people in
North Lanarkshire needs to be addressed. 
Addressing the disadvantage and inequality that some groups of people experience because of societal
constructs, prejudice, direct and indirect discrimination requires a strong, sustained strategic approach
directly aligned to The Plan for North Lanarkshire and other key plans such as North Lanarkshire’s
ERDP. ‘Employment’ and ‘Education’ are two of the five key themes of this strategy which need to be
embedded within the goals of the 2023-2028 ERDP. As such, and given current economic
circumstances, this ERDP will focus much more on opportunity and using investment to provide
chances to those most excluded. 
Workforce for the Future Strategy
Building a skilled workforce for the future plays a significant part in delivering our ambition for
North Lanarkshire. In economic terms, making sure that we have a skilled workforce will support
a more sustainable place that will help the council and its partners to continue to grow its economy
and create better opportunity for our residents and young people. 
The Workforce for the Future Strategy and ERDP Action Plans need to ensure that investment
plans continue to support future strategy that is focused on skills and community benefit. More
importantly, investment through the ERDP needs to be targeted and actively support skills
development across key growth sectors. 
The Place, The Vision
The Place, The Vision sets out an investment plan for North Lanarkshire focused on 4 key themes –
‘Town and Community Hubs’, ‘Town Centres’, ‘Country Parks’ and ‘Connectivity’. 
The refreshed ERDP needs to ensure that it remains closely linked to this vision and make sure that
investment being made in our housing, town centres, business and connectivity fits with wider plans
for our town and community hubs and greenspace and that these remain accessible to all. 
Climate Plan, Action on Climate Together 2030
This strategy encompasses the council’s climate emergency declaration and subsequent target to
achieve net-zero emissions by 2030. To do this, carbon efficiency has to be embedded in all future
investment decisions made by the council. 
Council decisions need to consider how new development can be offset against our plans for growth.
This not only means investment in council owned assets but consideration as to how the council can
drive forward carbon savings across the private sector and our third sector partners.

Page 14

Digital and IT Strategy
IT and digital are integral to the future success of The Plan for North Lanarkshire, Digital Communities,
a Digital Economy, and a Digital Council. Investment made through the ERDP offers opportunity for
digital infrastructure and better digital connectivity. 
Commsworld have been appointed as the council’s digital partner and there should be early
engagement with them in relation to all investment being made through the ERDP and other council
led capital investment plans to ensure that opportunity to improve digital infrastructure across North
Lanarkshire is not missed. 
Developing housing that promotes improved quality of life and creates a better place to live 
As of June 2021, there were more than 341,000 residents living in more than 153,00 homes across
North Lanarkshire’s towns and settlements. 
With over 30% of homes in North Lanarkshire socially rented (compared to a Scottish Average of 23%),
public sector investment in our housing stock remains critical to support population growth within
North Lanarkshire. This is reflected in part via the council’s commitment to delivering one of Scotland’s
most ambitious affordable housing programmes. In 2018 the council pledged to deliver 5,000 new
affordable homes by 2035 with 1,494 new council homes already completed and a further 267 in
development as of March 2022. Added to this, the council aims to support our partner social landlords
to deliver an additional 758 affordable homes by 2027/28. 
However, this is not simply just about constructing new properties but also about creating improved
quality of homes, following through on the council’s commitment to replace our ageing tower blocks
with modern, energy efficient and accessible property whilst recognising that young people, families
and our elderly population need the right homes in the right places. 
With only 70.3% of North Lanarkshire’s housing stock privately owned (owner occupied and private
rented), there is also a vital need to expand opportunity for people to be able to buy their own homes
and remain within or relocate to North Lanarkshire. With over 141ha of developable land available at
Cumbernauld Community Growth Area – (Cumbernauld CGA) and 140.46 available at Ravenscraig,
these two sites by far offer the most extensive opportunity for private sector build. 
While private sector housing in most areas of North Lanarkshire is generally affordable and in good
supply, businesses continue to highlight that there is lack of affordable rented accommodation for
those on short-term or temporary contract and who are unable or unwilling to commit to
homeownership. To address this issue, North Lanarkshire Council continue to review and assess
opportunity to support intermediate tenures such as mid-market rent. 
Lastly, whilst the total number of households in North Lanarkshire increased by 1,200, between 2019
and 2021, future projections to 2043 show significant growth. Nevertheless, since mid-2020, there has
been a number of issues which have affected development and provide challenges to the council to
ensure that our programme for housing development does not stall. 
Challenges Faced 
Covid, Brexit and the wider geopolitical landscape has had a significant impact on the council’s
construction and development programmes over the last three years. It has led to supply chain delays,
significant contract price increases and inflationary rises. This has in turn put significant pressure on
council budgets to deliver on its programme (with the average build cost of a new build council home

Page 15

rising from circa £190-195k (pre-Covid) to £215-220k. This represents the average cost across all
property types and sizes and costs vary from site to site.   
Added to this, all social landlords face significant pressure on their resources, which may impact on
their ability to fund new build and other investment programmes. 
Private sector development has also been constrained by rising costs and financial uncertainty over
the last two to three years with only 492 new private sector homes completed in 2021/22 compared
to 926 in 2018/19. However, private sector development is also affected by other issues at key sites
such as Cumbernauld CGA (where infrastructure investment is required) and Ravenscraig (where
abnormal ground conditions has led to significant abnormal costs). 
Recommendations 
To help deliver the homes that North Lanarkshire needs to grow over the next 5 years, the council will: 
• continue to focus investment towards the council’s affordable housing stock to make sure that
the target of 5,000 new council homes for North Lanarkshire is reached by 2035;
• continue to support the delivery of the affordable housing programme including intermediate
tenures such as mid-market rent;
• enable private sector housing development to support the regeneration of strategic sites such
as Ravenscraig.  
Reshaping our town centres to ensure that these provide modern and attractive centres that meet
the needs of our communities 
Town Centres are vital for our sense of community and place and their attractiveness and quality as a
place to live is strongly interlinked with the image and perceived success of North Lanarkshire. North
Lanarkshire has eight recognised town centres: Airdrie, Bellshill, Coatbridge, Cumbernauld, Kilsyth,
Motherwell, Shotts and Wishaw. Each town has its own distinctive features and distinct mix of cultural,
leisure and retail facilities. 
However, as with most other areas across Scotland and the UK, vacancy rates continue to increase
across our towns as town centre shopping continues to be impinged by out-of-town retail parks and
in particular online shopping. North Lanarkshire’s town centres have a vacancy rate of almost 19%.
This vacancy rate is projected to continue to rise as retail continues to fail (a decline which has been
accelerated by the impact of Covid and the cost-of-living crisis). 
To address this decline, the 2019-23 ERDP highlights that town centres need a broader foundation for
success with a mix of uses sustained by a resident population. In doing so, one of the recommendations
of the 2019-23 ERDP was to develop aspirational visions for all of North Lanarkshire’s eight town
centres. Following a programme of public engagement and stakeholder consultation, as well as input
from a range of expert consultants, these visions, providing high level concept designs for our town
centres, were approved by the council’s Policy and Strategy Committee in September 2021. Whilst
these Visions are very specific to each town centre and their communities, they shared a number of
commonalities: 
• the need to consolidate retail within our town centres, increase residential footfall and address
vacancy through town centre housing development;
• a wish to promote local access to our town centres through active travel;
• an aspiration to, where possible, establish transport hubs connecting up bus and rail networks;

Page 16

• a desire to incorporate proposals for town or community hubs within our town centres where
possible; and
• proposals to create new bespoke gateways to our towns. 
The next stage of bringing these visions to life involves developing action plans for each town that will
specifically identify short, medium and long-term activity to help promote and support the concepts
identified within the town centre visions. This work, co-produced with local communities and
residents, is already underway and will be completed for all eight towns by mid-2024. 
However, although the action plans for our town centres are still in development, the council has
continued to work to address key issues which impact upon the image of our centres and which
communities have identified as prolonged blight within our towns. As such, over the last four years of
the 2019-23 ERDP, more than £70m investment has been made in regenerating our town centres
funded through the council’s capital programme and a range of external town centre and place making
funds. 
Challenges Faced 
The work undertaken through the delivery of the 2019-23 ERDP, together with wider macro-economic
factors, has given rise to a number of practical challenges in relation to the regeneration of our town
centres.   
It was already well recognised that complex property ownership patterns within town centres and
development constraints constituted two of the main barriers to the redevelopment of our towns.
However, what has presented a greater challenge to the council more recently is owners’ unrealistic
expectations of town centre property value, which is often higher than the current market value that
the council is able to pay.  In most of these cases, the buildings being sought by the council are in poor
condition, with little or no ongoing maintenance, and will continue to fall into further disrepair due to
failure to agree their acquisition price. 
Added to this, there has been a number of other issues which have impacted on bringing other town
centre projects forward. These include: 
• the extended timescales and resource requirement needed to establish the justification and
implementation of compulsory purchase orders;
• medium to long-term lease agreements of individual units tying up the acquisition of larger
retail properties;
• energy efficiency and building regulation requirements, especially for conversion of property
to flatted accommodation above commercial premises; 
• finding an alternative use for vacant retail properties within our town centres where these are
not suitable for residential use; and
• the cost of conversion of town centre vacant properties. 
In addition to these project specific barriers, elevated inflation levels have not only given rise to
increased construction costs but has also led to increased pressure on council budgets. Moreover, one
of the key annual funding streams which is available to support town centre regeneration, the Scottish
Government’s Place Based Investment Programme, is only currently guaranteed up until 2024/25. As
such, longer-term funding plans still need to be put in place to support the delivery of the emerging
town centre action plans and ensure our ambitions for transformative town centre change can be met
in full.

Page 17

Recommendations 
To help reshape our town centres to ensure that these provide modern and attractive centres that
meet the needs of our communities over the next five years, the council will: 
• establish and commence delivery of town action plans for all eight town centres (aligned with
our approved town visions), agreeing short, medium and long-term investment plans for each;
• continue to prioritise funding and secure external investment for the regeneration of our town
centres;
• review how the council can be more effective in addressing failing buildings in our town
centres, including potential use of Compulsory Purchase Orders where required. 
Improving our business and industrial infrastructure, creating opportunities for investment and for
companies to start-up or relocate here 
North Lanarkshire has one of the fastest growing economies in Scotland with GVA increasing by 118%
over the last two decades. The number of registered enterprises in North Lanarkshire has also
increased from 6,760 to 8,420 between 2010 and 2022. 
Businesses across the authority have a combined turnover of almost £16M (6% of all Scottish business
turnover), with nearly half of North Lanarkshire’s businesses within the retail, construction, scientific
and technical services industries and the remaining sectoral mix fairly evenly spread between a diverse
range of sectors such as administrative and support services, transportation and storage,
accommodation and food services and manufacturing. 
Demand for commercial space in North Lanarkshire is high and, whilst our office market remains
relatively weak (due to historic oversupply), with almost 25million sqft of industrial floorspace, the
rate of vacant industrial units is at a historic low of 3.5%. Added to this, North Lanarkshire has over
half (53%) of all available marketable land in the Glasgow City Region. 
To support continued business growth across North Lanarkshire, the council took forward a number
of initiatives via the 2019-23 ERDP. These include:
• the development and delivery of the 2020-23 ‘Workforce for The Future Strategy’ which aims
to align workforce skills with future jobs demand and promote access to higher skilled
employment in order to help address ‘in-work poverty’;
• the preparation of North Lanarkshire’s Economic Recovery Plan which was designed to sustain
and support business recovery through the covid pandemic;
• the establishment of Invest in North Lanarkshire, a bespoke online marketing campaign
focused on promoting investment in North Lanarkshire and opportunities for companies to
locate here;
• £4.809m Vacant & Derelict Land Funding provided to Fusion Assets (NLC’s arms-length
economic regeneration and property development company) to help kick-start industrial
development at Gartcosh Business Interchange, Ravenscraig Industrial Park and Link Park
Business Park (Newhouse);
• securing funding for the development of the Smart Hub Lanarkshire, a new manufacturing
innovation hub at New College Lanarkshire (Ravenscraig Campus) used to promote new
technology and incorporation of automation within North Lanarkshire’s manufacturing
industries; and

Page 18

• securing £5m external funding for the regeneration and redevelopment of Braidhurst
Industrial Estate to be used as a pilot for the renewal of more marginal estate within North
Lanarkshire
In addition to activity undertaken though the council, the Glasgow City Region Economic Strategy was
launched in 2021, setting out a vision where by 2030 Glasgow City Region will have the most
innovative, inclusive and resilient economy in the UK. This regional strategy highlights three key
priorities which should be used to help guide future business and industry investment in North
Lanarkshire. These are:
• promoting an inclusive economy by addressing worklessness and creating accessible
employment opportunity;
• improving productivity through upskilling, innovation, fostering key growth sectors and the
continued expansion of the region’s ‘foundational economy’; and
• supporting investment and activity which promotes wider goals for net zero. 
Challenges Faced
Due to its close proximity to Glasgow and the draw that this has for financial and administration
sectors, the office market in North Lanarkshire is oversupplied and currently relatively weak with
vacancy rates of 15.4% and average rental values of 23% below the Glasgow regional average. 
On the other hand, over the last decade, average rents for industrial space in North Lanarkshire have
risen by an average of +3.1% per annum, whilst the volume of industrial property sales in 2020 at
£106m has been a record high, pushing average prices up. However, rising construction costs and an
oversupply of older industrial properties across the region (at a much lower rental cost than modern
new facilities) is likely to start to constrain investment in new facilities. 
A report prepared by Co-star in 2022 also highlighted that industrial vacancies along key motorway
corridors such as the M8 is now at a record low (3%) with demand continuing to far outstrip supply
and level of available developable land continuing to fall.
These strategic business locations represent a vital investment opportunity for North Lanarkshire and
the potential to make available land via the development of the Orchard Farm roundabout access of
the A8 to open-up new industrial land at Mossend International Railfreight Park (MIRP). 
Although these motorway corridors provide North Lanarkshire’s main strategic business locations,
consultation undertaken as part of the development of the ERDP 2023-2028 has highlighted that for
those without cars, accessing these locations is difficult from towns and settlements across North
Lanarkshire due to a lack of public transport options (as is the case for those residents from smaller
and rural settlements trying to access employment opportunity in general). 
Lastly, this consultation also highlighted that, although information in relation to commercial property
or land enquiries that the council or its partners receive is generally well shared, there remains a
number of initial enquiry entry points (including  Enterprise, Growth, Planning and Place and Estates
Teams, Fusion Assets, North Lanarkshire Properties, Lanarkshire Business Gateway and Scottish
Enterprise) without a formal process for recording, sharing or reporting on these.

Page 19

Recommendations 
In order to promote growth and inclusive growth over the next five years, the refreshed ERDP proposes
the following recommendations: 
• promotes a mix of development across our motorway corridors and accessible business
locations to support the development of our foundational economy as well a high-end growth;
• continues to support enabling investment which brings our vacant and derelict land and
brownfield sites into commercial use;
• improves how we record and respond to enquiries from businesses to provide a co-ordinated
approach across relevant council services to help attract, retain and expand businesses and
employment opportunities; 
• builds upon work which supports innovation and skill development though the development
of sectoral learning academies; and
• supports investment, via our ALEOs, that will continue to improve, modernise and expand
commercial stock availability across North Lanarkshire. 
Added to these activities, it is also intended to undertake a full review of sites allocated for business
and industry within the current Local Development Plan (LDP) to inform the preparation of next LDP
and ensure that we have suitable sites available to attract and retain businesses and employment
opportunities. 
Continuing to improve our connectivity and develop new opportunities by transforming our road,
rail and digital infrastructure 
With key motorways (M8, M74, M73 and M80) running across and linking the local authority area, rail
freight depots and a new transport hub being built at Motherwell Train Station, North Lanarkshire is
the ‘best-connected’ place in Scotland. 
The new orbital route delivered through City Deal will help improve this connectivity even further,
linking Motherwell, Ravenscraig, Airdrie and Cumbernauld directly to the M8 and M74 motorway
corridors. New active travel routes are helping to create 20-minute neighbourhoods, connecting our
communities with our greenspace, town centres, travel hubs and public facilities whilst new access
infrastructure such as the City Deal Orchard Farm Roundabout on the A8 will open up new commercial
development opportunity. 
In addition to this access infrastructure, work is being undertaken to support the delivery of Electric
Vehicle (EV) charging across North Lanarkshire. Much of this work is now being undertaken at new
housing and commercial developments. However, in 2020, Project PACE was formed to trial the
approach of an electricity network provider leading on the planning and installation of public EV charge
points at a regional scale across Lanarkshire. Between its launch and 2022, Scottish Power Energy
Network, funded through the Scottish Government, installed 167 EV charging points at 44 EV hubs
across Lanarkshire including 23 hubs in North Lanarkshire with 22 standard, 30 fast and 32 rapid
charging points. 
Building on the works undertaken through initiatives such as Project PACE, the Scottish Government
launched a £30M EV Investment Fund (EVIF) in 2022 in order to support local authorities to draw in
private investment across Scotland and enable the implementation of a variety of public charge point
owner/operator models. Models for delivering future EV charging are currently being considered at a
regional level. However, this needs to be interlinked to our wider plans for town centre renewal,

Page 20

housing supply, town and community hubs, parks for the future, business and community
regeneration. 
Digital connectivity also remains at the heart of renewing North Lanarkshire, ensuring that all our
residents and businesses have access to affordable full-fibre or fast-speed broadband. To support this,
the council has entered into a 15-year partnership agreement for digital connectivity services with
‘Commsworld’. This commercial partnership has been put in place to help deliver high-quality, reliable
fibre connections that will make a transformative difference to investment opportunities for
businesses in the area as well as tackling digital exclusion among our residents. 
It will achieve this by futureproofing North Lanarkshire’s digital backbone, enhancing the coverage and
reach of gigabit-capable networks to businesses, private and council-owned social housing and
residential households that are not currently served by existing networks. This will bring enormous
benefits including increased access to employment opportunities, improve health and social wellbeing
and economic growth.
Lastly, launched in 2021, North Lanarkshire’s Active Travel Strategy aims to direct the creation of a
wide range of connections across North Lanarkshire that can be utilised for everyday journeys such
as travelling for education, day to day needs and employment opportunity. Significantly, this
strategy provides a framework for the council to prioritise and bring forward active travel
interventions across North Lanarkshire that will improve links within our towns and planned town
and community hubs. 
In helping to deliver this, over the last four years, North Lanarkshire Council has made investment
in key routes such as Cumbernauld Greenlink and Ravenscraig Active Travel links. Added to this,
active travel plans are now being developed to deliver improved greenlinks to key employment
locations such as Eurocentral and Maxim. 
Challenges Faced
Although, North Lanarkshire has great road and rail infrastructure, access to and from many of our
rural communities and business locations is dependent upon car ownership. Car ownership across
most of North Lanarkshire is relatively low and, whilst pre-covid, commercial bus services across
many areas of North Lanarkshire was poor, post-covid, commercial routes have worsened. In 2019,
legislation was approved to permit local authorities to run public bus services. However, such
services, where most needed, are likely to be commercially unviable and would need to be heavily
subsidised. 
Whilst plans for City Deal Investment are ringfenced and on budget, as we progress with other
infrastructure investment plans across North Lanarkshire, as with all other capital programmes,
rising construction costs and inflation continues to impact on proposals. As such, there is a clear
need to prioritise this investment to help ensure that we best achieve our goals for inclusive
economic growth, net carbon zero and digital connectivity. 
Lastly, much of the land required for infrastructure development across North Lanarkshire falls
outside council ownership. This often results in the need to agree servitude rights or acquire land
or property through compulsory purchase orders, slowing development down and bringing about
higher costs (potentially making schemes financially unviable).

Page 21

Recommendations 
In order to continue to enhance connectivity across North Lanarkshire, it is recommended that the
council: 
• continue to deliver the City Deal programme;
• ensure that inclusive economic growth remains at the heart of opportunity to support
affordable and accessible transport systems (via the Local Transport Strategy due to be
launched in 2024); 
• invest in the delivery of the council’s Active Travel Strategy to ensure a comprehensive
connection of active travel routes to key places across North Lanarkshire;
• support the delivery of Electric Vehicle Charging infrastructure across North Lanarkshire; and
• work with the council’s digital partner to install and invest in infrastructure that helps create
one of the best and most affordable/accessible digital provisions in the UK. 
ERDP Action Plan 
The refreshed ERDP is a high-level five-year economic development framework which is aligned to The
Plan for North Lanarkshire. In order to support the delivery of this plan, the ERDP will be underpinned
by an Action Plan which will be subject to annual review, monitoring and update.
This Annual Action Plan will set clear targets and aims for each forth-coming year which will assessed
and measured bi-annually. This will allow for:
• amendments to be quickly made to plans in response to any changing or arising challenges
and opportunities facing the North Lanarkshire economy at any given time; and
• the impact of activity being delivered through the ERDP on North Lanarkshire’s wider
economic Performance Framework to be assessed.

Page 22

Appendix 2
ERDP Action Plan
2023-2024

Page 23

The Economic Regeneration Delivery Plan is a key strategic document which is aligned
to The Plan for North Lanarkshire and other key strategies, policies and plans. 
Together this strategic policy framework ensures
that work is aligned with our priorities and enables
the required resources and working practices needed
to facilitate delivery of the shared ambition. 
As a high-level investment framework,
the Economic Regeneration Delivery Plan will be
aligned with our composite capital programme and
will be refreshed again at the end of 2027/28. 
This Action Plan supports delivery of the Economic
Regeneration Delivery Plan. It will be monitored and
updated annually. Future updates can be found at
www.northlanarkshire.gov.uk/ERDP 
Improving
economic
opportunities and
outcomes for all
The Plan for
North Lanarkshire
Economic
Regeneration
Deliver Plan
NLC
Equalities
Strategy
Workforce
for the
Future
The Place,
The Vision
Climate Plan, Action
on Climate Together
2023 
Digital and IT
Strategy
Active Travel
Strategy

Page 24

Theme: Live
ERDP Priority 1: Developing housing that promotes improved quality of life and creates a better place to live 
ERDP Action Baseline Target 2023-24 Lead Team
1.1 Deliver new build council homes via
NLC’s New Supply Programme.
Between 2010/11 and 2021/22 NLC
has delivered 934 new build homes
across the authority via the New
Supply Programme alone.
Complete 276 new build
council homes during
2023/24
New Supply
1.2 Bring homes into council ownership
via NLC’s Open Market /Empty Homes
Purchase Schemes, including homes
previously bought under the Right to
Buy scheme
As of 31 March 2022, NLC had brought
560 homes into council ownership
since the introduction of the Open
Market /Empty Homes Purchase
Schemes.
75 Open Market /Empty
Homes Purchase Scheme
completions during
2023/24
New Supply
1.3 Enable the private sector to support
the delivery of the New Supply
Programme, via off the shelf
purchases.
As of 31 March 2022, NLC has
acquired 117 new build homes from
the private sector
Progress the delivery of a
further 50 new build
acquisitions during
2023/24.
New Supply
1.4 Prepare and support the delivery of
the Strategic Housing Investment Plan
(SHIP)
Between 2010/11 and 2021/22, 1,494
affordable homes have been delivered
via the council’s New Supply
Programme and 1,862 by Registered
Social Landlords (RSL’s) 
Prepare the 2024/25 SHIP
which will identify sites to
meet Local Housing
Strategy priorities and
maximises the use of
available Scottish
Government grant
funding. 
Support the delivery of
sites within the current
2023/24 SHIP.
New Supply

Page 25

Theme: Invest
ERDP Priority 2: Reshaping our town centres to ensure they provide modern and attractive centres that meet the needs of our communities 
ERDP Action Baseline Target 2023-24 Lead Team
2.1 Co-produce a series of Town Action
Plans with local communities to
enable the realisation of the Town
Visions.
Eight Town Visions were approved by
committee in 2021.
Finalise the first four Town
Action Plans in Airdrie,
Cumbernauld, Motherwell
and Wishaw. 
Town Action Plans for
Bellshill, Coatbridge,
Kilsyth and Shotts in
development for
completion mid-2024.
Growth
2.2 Develop a sense of place by
protecting, repurposing or
redeveloping vacant, derelict or
unused priority buildings and sites
within our town centres and investing
in town centre regeneration activity
that will support the delivery of the
Town Visions
Since the Growth Team was formed in
2019, 15 town centre properties/sites
have been acquired across the
authority with a view to either
converting existing properties to
residential developments, building
new homes on cleared sites or
upgrading commercial premises.
Continue to engage with
local property/landowners
with a view to acquiring
key town centre
properties/sites
earmarked for
conversion/improvement.
Growth 
2.3 Between 2010/11 and 2021/22 there
were 1,460 new homes delivered
within North Lanarkshire’s 8 town
centres (including edge of town
developments). These properties have
been delivered via North Lanarkshire
Council and Registered Social
Landlords (RSL’s).
Deliver or support the
delivery of 52 new
affordable homes within
our town centres
(including edge of town)
during 2023/24
New Supply / Growth

Page 26

2.4 Support new investment in North
Lanarkshire’s town centres.
£2.8m was secured via PBIP in
2021/22 and a further £2.4m in
2022/23.
Deliver the Scottish
Government’s Place Based
Investment Programme
allocation for 2023/24 (NB
allocation still to be
confirmed by Scottish
Govt).
Growth
2.5 North Lanarkshire has submitted
various funding bids over the course
of the previous ERDP (2019-2023)
including the UK Government’s
Levelling Up Fund and Community
Renewal Funds. 
North Lanarkshire secured more than
£3.7m during 2021/22 and 2022/23 as
part of the eighth and ninth rounds of
the Scottish Government’s
Regeneration Capital Grant Fund
(RCGF). 
In January 2023 the council was
awarded £9,225,000 from the UK
government’s Levelling Up Fund to
support the delivery of the
Cumbernauld Town Vision
Engage with local
community organisations
to enable applications to
third party regeneration
funds, where appropriate. 
Continue to support 2
existing community led
projects funded under
previous RCGF rounds. 
Submit bids to any
relevant regeneration
challenge funds
announced by the UK
Government, Scottish
Government, or other
relevant external funding
bodies.
Growth

Page 27

Theme: Work
ERDP Priority 3: Improve our business and industrial infrastructure, creating opportunity for investment and for companies to start-up or
relocate here 
ERDP Action Baseline Target 2023-24 Lead Team
3.1 Improve the provision of high-quality
business and industrial space either
directly or through our ALEOs or Joint
Ventures.
£1.334m invested in business and
industry zoned land or upgrades
to existing business and
industrial infrastructure
across North Lanarkshire between
2018/19 and 2021/22. 
This includes NLC and ALEO funding
only.
NLC and Fusion Assets to
invest a minimum of
£2.3m in key business and
industrial projects
Fusion Assets / Growth
3.2 £6.924m external, private or loan
funding secured for investment in
office and industrial developments
across North Lanarkshire between
2018/19 and 2021/22.
£3.45m external funding
(including private sector
funding) to be secured by
NLC/Fusion Assets for
business and industrial
infrastructure in 2023/24.
Fusion Assets / Growth
3.3 4.07ha of land remediated or
improved for business and industry
use across North Lanarkshire between
2018/19 and 2021/22.
2.0ha of land to be
remediated or improved
(by NLC or Fusion Assets)
for business and industry
use in 2023/24.
Fusion Assets/ Growth
3.4 69,910 sq.ft of commercial workspace
created or refurbished as a result of
investment by NLC, Fusion Assets or
NLP across North Lanarkshire between
2018/19 and 2021/22.
16,500 sq.ft of business
and industrial workspace
to be created or
refurbished by NLC, Fusion
Assets and North
Fusion Assets/ Growth

Page 28

Lanarkshire Properties in
2023/24.
3.5 Ensure our investment opportunities
deliver economic opportunities and
outcomes for all
Stage 2 RCGF submission for
Braidhurst Industrial Estate approved
December 2021 
- £1.8M RCGF awarded to project
Progress delivery of a
regeneration scheme for
Braidhurst Industrial
Estate, including the
provision of new start-up
units and refurbishment
of existing units owned by
North Lanarkshire
Properties.
Growth
3.6 N/A Develop a Business and
Industry Strategy
in line with investment
opportunities, site
prioritisation and future
market demand.
Growth

Page 29

Theme: Invest
ERDP Priority 4: Improve our connectivity and develop new opportunities by transforming our road, rail and digital infrastructure 
ERDP Action Baseline Target 2023-24 Lead Team
4.1 Continue to deliver the City Deal
Programme
Planning approval granted. 
Full Business Case (FBC) for the West
Coast Mainline Crossing approved
with works on site 2022/23.
Continue to progress
delivery of Ravenscraig
Access Infrastructure to
support the
redevelopment of
Ravenscraig and
connect the M74 to M8
as part of Pan
Lanarkshire Transport
Corridor. 
Complete West Coast
Mainline Crossing. 
Full Business Case (FBC)
approval for the
Motherwell to
Ravenscraig access (new
roundabout at Airbles
Road/Windmillhill Street
junction; dual carriageway
from the junction to
Ravenscraig Regional
Sports Facility) 
Enterprise Projects

Page 30

Commence construction
of Motherwell to
Ravenscraig access.   
4.2 Ground investigation works complete.
Preferred option for East Airdrie Link
Road route identified.
Continue to progress
delivery of the East Airdrie
Link Road (EALR). 
Procure and appoint
consultant team for Stage
3 (Detailed Design and
Planning Application). 
Commence detailed
design.  
Enterprise Projects
4.3 Contractor (Balfour Beatty) appointed,
and works have commenced on site.
Improve Motherwell
Town Centre transport
interchange to support
active and sustainable
travel.
Complete works at
Motherwell Rail Station
(ScotRail) and Muir Street
(NLC) during 2023/24.
Enterprise Projects
4.4 Outline Business Case (OBC) for
A8/M8 Corridor Access Improvements
project was approved by Glasgow City
Region City Deal Cabinet in 2022.
Full Business Case
approval for the Orchard
Farm roundabout. 
Enterprise Projects

Page 31

Appointment of
contractor to deliver the
Orchard Farm Roundabout
to support the
development of key
business and industrial
sites on the A8/M8
corridor.
4.5 The OBC for the A8/M8 Corridor
Access Improvements project was
approved by Glasgow City Region City
Deal Cabinet in 2022. This included
sustainable transport improvements
and enables us to develop and design
our proposals.
Progress delivery of the
Eurocentral Strategic
Active Travel project. 
Appoint consultants to
develop detailed design
proposals during 2023/24.
Enterprise Projects
4.6 Support and enable investment in
active travel
Ravenscraig Active Travel Link (RATL)
phase 1 complete – providing a new
path enabling residents to walk, wheel
and cycle. The path runs north from
‘The Castings’ housing development
off Meadowhead Road to Ravenscraig
Regional Sports Facility and 'The Craig'
public park. 
Deliver phase 2 of the
RATL from Meadowhead
Road to Robberhall Road. 
Enterprise Projects
4.7  Funding secured via UK Shared
Prosperity Fund - £75,000 allocated
towards active travel feasibility
studies. 
Undertake feasibility
studies to support the
development of active
travel routes across North
Lanarkshire. 
Infrastructure &
Transportation /
Enterprise Projects

Page 32

4.8 7.8km of active travel routes
enhanced or created between
2018/19 and 2021/22.  
A further 6km of active
travel routes to be
enhanced or created
during 2023/24, linking
communities, arterial
routes and transport hubs
with town centres
and key business locations
in North Lanarkshire. 
Infrastructure &
Transportation /
Enterprise Projects
4.9 Deliver a worldclass digital
Infrastructure across North
Lanarkshire
Commsworld Ltd were appointed to
deliver connectivity services in
February 2022. 
The project to deliver Full Fibre
connectivity through the Councils
Wide Area Network is progressing
well. To date, CommsWorld have
delivered 162k metres of Fibre
Infrastructure. 
3 apprentices were recruited during
2022 via the NLC/Commsworld Shared
Apprenticeship model.
Fibre infrastructure to be
fully delivered by June
2023. 
This infrastructure is key
to then enable other call
off contracts, one of which
is Public Wi-Fi, which
when delivered, will be
the single Public Wi-Fi
service that will
incorporate Town Centres
and any public use
buildings and spaces that
are deemed to require it. 
This new infrastructure
will be an enabler for
further digital
opportunities throughout
North Lanarkshire.
Business Solutions

Page 33

Through the Community
Benefits and Added Value
elements of the contract,
key actions will be
delivered throughout
2023-24 including:
• Recruitment of
additional 3
apprentices through
the NLC/Commsworld
Shared Apprenticeship
model.
• Continued delivery of
SmartSTEM/ Young
Enterprise Scotland
programme in Schools
• Provision of work
experience
placements
• Delivery of a digital
showcase for
businesses 
• Development of
activity to maximise
the uptake of Scottish
and national
broadband voucher
schemes
• Development and
delivery of actions to

Page 34

support community
engagement,
empowerment and
capacity building