Democracy Spraffa

Agenda Document Pack - Enterprise and Fair Work Committee - 21/08/2026

North Lanarkshire Council · 21 August 2026
Back to Enterprise and Fair Work Committee — 21 August 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

12 August 2026 
Members of the 
Enterprise and Fair Work Committee
Chief Executive’s Office
Rachel Blair
Chief Officer (Legal, Democratic and Strategy)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk 
Notice is given that a Meeting of the Enterprise and Fair Work Committee is to be held in
the Council Chamber, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on Friday, 21
August 2026 at 10:00 AM which you are requested to attend. 
The agenda of business is attached. 
Rachel Blair
Chief Officer (Legal, Democratic and Strategy) 
Members : 
Clerk Name: Karen Swan
Clerk Telephone: 07919 730 272
Clerk Email: committee@northlan.gov.uk 
A McVey, F McKay, M Boyd, A Bustard, J Cairns, G Currie, K Docherty, A Duffy-Lawson, H
Dunbar, F Fotheringham, W Goldie, H Gray, A Khan, J Leckie, A Masterton, B McCulloch,
M McPake, L Nolan, D Robb, G Robinson, W Shields, R Sullivan.  
Page 1 of 110

Page 2

Page 2 of 110

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical
Standards In Public Life Etc. (Scotland) Act 2000 
Operational 
2 City Deal Programme Update
Submit report by the Chief Officer (Place) informing of
the current status of North Lanarkshire City Deal
Infrastructure Programme and its subprojects. 
5 - 16 
3 Visitor Levy and Visitor Strategy Update
Submit report by the Chief Office (Place) summarising
tourism development activity in line with the Council's
2022/26 Tourism Strategy, including UK Shared
Prosperity funded projects. 
17 - 26 
4 Economic Regeneration Delivery Plan and
Performance Framework – Annual Progress Report
Submit report by the Chief Officer (Place) providing an
update on progress made towards the implementation
and delivery of North Lanarkshire's Economic
Regeneration Delivery Plan (ERDP) and associated
Action Plan. 
27 - 80  
Performance 
5 Business Gateway Lanarkshire - Performance
Report 2025/26
Submit report by the Chief Officer (Place) providing an
update on the performance of the Business Gateway
Lanarkshire service from 1 April 2025 to 31 March
2026. 
81 - 94  
Contracts 
6 Braidhurst Industrial Estate – Contract Variation
Submit report by the Chief Officer (Place) advising of
the Braidhurst Industrial Estate contract spend. 
95 - 102
Page 3 of 110

Page 4

7  Re-appointment of Category B Directors - Routes
to Work Ltd
Submit report by the Chief Social Work Officer
(Education, Families, Justice & Integrated Practice)
seeking approval for the re-appointment of four
Category B directors to Routes to Work Limited. 
103 - 110 
Page 4 of 110

Page 5

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    LN/PH Date 21/08/26 
City Deal Programme Update 
From  Pamela Humphries, Chief Officer (Place)  
E-mail Lyndsay Noble, NobleLy@northlan.gov.uk 
Executive Summary 
The North Lanarkshire City Deal Programme Update Report seeks to inform the Enterprise
and Fair Work Committee of the current status of North Lanarkshire City Deal Infrastructure
Programme and its subprojects.       
Recommendations
It is recommended that the Enterprise and Fair Work Committee: 
(1) Acknowledges the status and recent progress of North Lanarkshire City Deal
infrastructure subprojects and revised programme. 
(2) Agree to the submission of the Enabling Commercial Spaces Ravenscraig Phase 2
Full Business Case (FBC) to the Glasgow City Region for approval.
(3) Approve the use of the £3,496,000 Local Growth Fund allocation to the Enabling
Commercial Spaces Programme for development of industrial units at Condor Park,
Eurocentral.   
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (5) Grow and improve the sustainability and diversity of North
Lanarkshire's economy
Programme of Work Transforming Places
Item 2
Page 5 of 110

Page 6

1. Background 
1.1 The Glasgow City Region (GCR) City Deal is an agreement between the UK and
Scottish Governments and the eight GCR Local Authorities, with the sole focus of
creating additional economic growth.  The 20-year GCR Deal was accepted by GCR
Council Leaders on 20 August 2014 and incorporated: 
• implementing a £1.13bn Infrastructure Fund to improve the regional transport
network, regenerate sites for economic use and improve public transport
provision;
• supporting growth in the life sciences sector;
• helping small and medium enterprises to grow and develop;
• establishing programmes to support the unemployed; and 
• piloting new ways of boosting the incomes of low wage employees.   
1.2 The City Deal Programme for North Lanarkshire, as part of the Infrastructure Fund
comprises the following sub projects: 
A8/M8 Corridor Access Improvements
• Eurocentral Strategic Active Travel 
• Orchard farm Roundabout
Glenboig Link Road (complete)
Pan-Lan Orbital Transport Corridor
• East Airdrie Link Road
• Ravenscraig Access Infrastructure South (Motherwell to Ravenscraig Link and
Airbles Road Improvements)
• Motherwell Town Centre Transport Interchange (complete) 
1.3 The City Deal programme under the Infrastructure Fund also includes the Enabling
Commercial Spaces project following a reallocation of City Deal Funding of
£11,287,602.00.
• Ravenscraig phase 1 – 2 commercial units 
• Ravenscraig phase 2 – 2 commercial units 
• West point, Cumbernauld – enabling works and 2 commercial units.   
2. Report 
2.1 East Airdrie Link Road 
2.1.1 The EALR Project has been developing at pace with 2 planning applications –
section one (Towers Road link) and full scheme – both now submitted in
January and June respectively.   Section one planning determination is currently
anticipated in September 2026.   
2.1.2 In May, to maintain momentum with the EALR programme, NHS Lanarkshire
appointed Atkins Realis Ltd to prepare the specimen design for Section 1 of the
EALR in May 2026.  The council, subject to approval, will progress the specimen
design for the remainder of the Scheme over 2026/27.  The council’s
procurement for the specimen design is nearing conclusion, and it is anticipated
Page 6 of 110

Page 7

that the contract award to the successful consultant will be approved by the
Depute Chief Executive under General Contract Standing Orders (21.3.2) and
reported to Committee in November for noting. 
2.1.3 The opportunity for section one of the EALR to be taken forward as a first phase
of work could still exist and subject to further project review a Full Business
Case (FBC) for section one would be submitted to the Glasgow City Region for
approval following agreement by Committee. 
2.1.4 The remainder of the EALR would follow subject to planning consent and land
acquisition with the full scheme intending to be complete and operational during
2031/32.  There may be opportunity, where feasible, for sectional completion of
the full scheme, allowing a further section to become operational during this
period. 
2.1.5 As Committee is aware, NHS Lanarkshire’s Monklands Replacement Hospital
Full Business Case (FBC) was not approved by the Scottish Government.  The
council has been seeking clarification from the Scottish Government and NHS
Lanarkshire with regards to the status of the Monklands Replacement Hospital. 
Currently, NHS Lanarkshire are advising that they will work closely with the
Scottish Government to progress a new hospital for Lanarkshire in a way that is
deliverable, affordable and provides best value for patients.   
2.1.6 The EALR project team are examining the impact of the Scottish Government
announcement on the EALR project.  The project team will work with NHS
Lanarkshire to understand the proposed ‘reset’ and redesign phase for the
proposed hospital whereby the revised hospital options are expected to go to
Scottish Ministers in 2027.  Members will be kept informed regarding the
potential implications for the delivery of the EALR as soon as further information
is available. 
2.2 Ravenscraig Access Infrastructure South 
2.2.1   As Committee is aware, the Ravenscraig Access Infrastructure South (RAIS)
project, following the removal of the RAI North sub project, now comprises two
sub projects: 
• Phase 1 - a new road connection between Windmillhill Street, Motherwell
and Ravenscraig from Airbles Road, passing under the West Coast Main
Line railway, and on to the Regional Sports Facility 
• Phase 2 - completing the dualling of Airbles Road between Hamilton Road
and Airbles Farm Road, with improved facilities for pedestrians and cyclists.   
2.2.2 Taking the RAIS project forward, as reported previously, a series of enabling
works will take place over 2026 and early 2027 comprising accommodation
works, service diversions and land remediation within Ravenscraig.  As these
enabling works progress, local members and committee will be kept updated. 
This builds upon the demolition of properties in 2025 to facilitate the new road
infrastructure. The procurement of the main works contract will follow towards
the end of 2026/27. 
2.2.3 As previously reported, the programme for the main construction works has
been reviewed to take into account the outcomes of the Value Engineering
Review and the appointment of consultants for the updated design work.  The
Page 7 of 110

Page 8

amendment to the programme previously reported also accommodates an
opportunity to bring part of the Airbles Road Improvement works forward in the
programme commencing enabling works during 2026/27. 
2.2.4 It is proposed that a members’ briefing will take place over September 2026 to
bring members up to date with the project. 
2.3 A8/M8 Corridor – Eurocentral Strategic Active Travel 
2.3.1 The Project will provide 10km of Strategic Active Travel Links, connecting
Eurocentral/Maxim Office Park/Newhouse and Mossend to surrounding local
communities and local rail stations.  These routes are designated as Strategic
Network Routes within the North Lanarkshire Active Travel Strategy. 
2.3.2 In May, Committee was advised that tenders to deliver works contracts to
deliver route sections between Holytown and Eurocentral and Whifflet Corridor
were to be issued via mini-competition using the Glasgow City Council Civils
and Infrastructure procurement framework. These route sections have been
prioritised as providing the most direct linkages between rail stations to both the
north and south of Eurocentral and connect to existing active travel
infrastructure along the M8 and within Eurocentral. To reduce risk, separate
tenders for each phase will now be issued. 
2.3.3 The Phase 1 (Holytown to Eurocental) tender has now been published and
subject to a successful tender outcome and securing all necessary approvals,
it is planned to commence work on site at Holytown in late 2026.  A comparison
between the cost, deliverability and benefits of Phase 2 and Phase 3 will be
undertaken in spring 2027, following completion of Phase 3 detailed design. 
This will determine the priority to take forward to construction with City Deal
Funding in early 2027.  As per the approved Outline Business Case, external
funding will be sought to deliver the remaining active travel phase. 
2.3.4 As agreed by committee in February 2026, the Full Business Cases will be
submitted to the Glasgow City Region City Deal Programme Management
Office (GCR PMO) for approval of the procurement outcome and release of the
remaining funding for the project.  Subject to approval of the Full Business Case
for Phase 1, it is anticipated that the contract award to the successful contractor
will be approved by the Depute Chief Executive under General Contract
Standing Orders (21.3.2) and reported to Committee in November for noting. 
2.4  Enabling Commercial Spaces Project (ECSP) 
2.4.1  As Committee agreed in May 2025, £11,287,602 of City Deal funding through
the Glasgow City Region (GCR) Enabling Commercial Spaces Programme was
allocated to support projects at Ravenscraig and Westfield Point, Cumbernauld
to be delivered by Fusion Assets. This funding is to support economic growth
by addressing market failure, creating flexible business space, providing
opportunities for employment and attracting inward investment. 
2.4.2  As Committee is aware, the North Lanarkshire Enabling Commercial Space
project will be taken forward as 3 sub projects - Ravenscraig phase one and two
and Westfield Point.  The 3 sub projects will be submitted as 3 separate Full
Business Cases.   
Page 8 of 110

Page 9

2.4.3 Phase 1 Ravenscraig ECSP Full Business Case (FBC) was submitted in
December 2025 (following agreement from Enterprise and Fair Work
Committee in August 2025) and was approved by the GCR Director of Regional
Economic Growth (under delegated authority) in January 2026.  Ravenscraig
Phase 1 comprises new build construction of 2 buildings totalling 29,210sq ft
and is currently on site, progressing well and is anticipated to be complete by
October 26.   
2.4.4 Ravenscraig Phase 2 comprises a further 2 industrial units extending to 32,920
sq ft.  The design team have completed the detail design, and the building
warrant is submitted allowing a FBC to be prepared to secure the City Deal
Funding.  Phase 2 has an anticipated works commencement at the beginning
of 2027 with a completion date prior to the end of that year.  The second phase
has secured VDLF of £500,000 to further extend the Enabling Commercial
Spaces overall project, maximising external funding. 
2.4.5  It is proposed to submit the Ravenscraig Phase 2 FBC to the GCR Project
Management Office for evaluation and approval in line with the dates set out for
2026. Committee is therefore asked to agree to the submission of the FBC
which will reflect the above scope, timescales and estimated works value of up
to £4.7m.  It is proposed that circa £4.2m of the remaining £8.23m of City Deal
Funding is allocated to Ravenscraig phase 2 and supplemented by £500,000 of
VDLF grant (as previously approved).   
2.4.6  Westfield Point, Cumbernauld phase 1 will also involve the development of 2
commercial units totalling 21,439 sq ft.  A design team will be commissioned in
due course, and an Agreement will be sought during 2027 from Committee for
submission to the Glasgow City Region in due course. 
2.4.7 Glasgow City Region Cabinet approved the Local Growth Fund (LGF)
Investment Plan at its meeting in May 2026.  This included additional funding of
£20m for the Enabling Commercial Space Programme (ECSP) over a 3 year
period April 2027 to March 2029, based on significant expressions of interest
from the 8 member authorities to invest in further employment land
development. North Lanarkshire has been allocated £3,496,000 from the LGF
Enabling Commercial Spaces Programme and it is proposed that this is used to
take forward the development and construction of industrial units at Condor
Park at Eurocentral by Fusion Assets. 
2.4.8 Approval is therefore being sought from Committee for the £3,496,000
allocation from the LGF Enabling Commercial Spaces Programme for
development at Condor Park, Eurocentral by Fusion Assets.  The 1.3 hectare
site already has planning approval for the construction of a multi-let industrial
scheme consisting of 8 units totalling 3,744 sqm and has match funding of
£300,000 in place from the vacant and derelict land fund for 26/27. 
Page 9 of 110

Page 10

3. Measures of success 
3.1 The North Lanarkshire City Deal Programme construction timescales have been
updated following a programme review (construction only): 
Glenboig/Gartcosh Community Growth Area: 
• Glenboig Link Road – May 2017 to June 2018 (complete) 
Pan Lanarkshire Orbital Transport Corridor: 
• Muir Street – January 2022 to June 2023 (complete) 
• Ravenscraig Access Infrastructure South – March 2022 to March 2029 - a phased
approach to be adopted with phase 1 Windmillhill Street, Motherwell to
Ravenscraig link June 27 to June 28 and Phase2 Airbles Road Improvements
September 26 to March 29.
• East Airdrie Link Road – August 27 to 2031/32 - a phased approach (subject to
land acquisition and planning permission) will be taken forward with section one
of the EALR is proposed to commence in August 27 and full scheme to follow
with completion during 2031/32. 
A8/M8 Transport Corridor: 
• Orchard Farm Roundabout – December 2027 to February 2029   
• Eurocentral Strategic Active Travel – October 2026 – June 2028 (delivered in
phases) 
Enabling Commercial Spaces: 
• Ravenscraig phase 1 – February 2026 to October 2026
• Ravenscraig Phase 2 – January 27 to October 27 
• Westfield Point, Cumbernauld – September 2027 to August 2028 
3.2  The Programme and its sub projects have been developed to ensure that at a North
Lanarkshire level, North Lanarkshire’s residents and businesses will directly benefit.  
3.3  Each project at Outline Business Case stage and sub-project at Full Business Case
stage has to demonstrate how it will deliver the direct and indirect benefits.  The
Business Cases identify the economic impacts, and the Benefits profile quantify and
details when outputs will be delivered and achieved as a result of the specific project
investment.  
3.4 The benefits will be measured over a 10-year period, reporting as part of the GCR
Gateways until 2035.   
3.5 All North Lanarkshire City Deal contracts seek to maximise community benefits from
contracts awarded for the Project. Community Benefits will be secured through the
procurement of services and works in line with the City Deal Community Benefit
Strategy. 
Page 10 of 110

Page 11

4. Supporting documentation 
4.1  No Supporting Documents. 
Pamela Humphries 
Chief Officer (Place) 
Page 11 of 110

Page 12

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The City Deal Cabinet has agreed that Inclusive Growth is to be fully embedded
within the GCR City Deal programme delivery and that it is also committed to
supporting the delivery of the Fairer Scotland Action Plan.  Future NLC subproject
OBC/FBC development will be scrutinised to ensure it meets the duties of the
Fairer Scotland Action Plan.  Fair work is integrated into City deal procurements. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Following Committee approval (May 2024) and GCR Cabinet Approval on 6 August
2024, the revised North Lanarkshire Glasgow City Region City Deal Programme is
as follows: 
• Glenboig Link Road                                                         £6.2m
• A8/M8 Corridor Access Improvements
o Orchard Farm                                                          £2.2m
o Eurocentral Active Travel                                        £4.3m
• Pan-Lan Orbital Transport Corridor
o East Airdrie Link Road                                  £185.3m
o Muir Street                                                              £3.8m
o Ravenscraig Access                                               £74.2m
Infrastructure                                                            
• Enabling Commercial Spaces (3 phases)                           £11.3m 
• Total                                                                                   £287.3m 
This is funded £160.3m by the GCR City Deal Infrastructure Fund and £127m by
North Lanarkshire Council. 
Subject to Committee Approval the Enabling Commercial Places total will increase
by £3,960,000.  This will be funded by the Local Growth Fund allocation to North
Lanarkshire Council. 
The financial implications of the City Deal Programme will be considered within the
council’s Long-term Financial Plan. To date budgetary implications over the next 5
years have been approved by the Policy and Strategy Committee. 
Page 12 of 110

Page 13

5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The City Deal Team work closely with Legal Services on all sub projects focusing
on land acquisition and CPO, procurement and contract preparation and
management, funding agreements and any other related matters. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☒ No ☐ 
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Individual projects under the City Deal Programme will require data management. 
As above, a data protection impact assessment has been and will, where required,
be carried out for projects.  Cybersecurity has been and will be fully considered in
conjunction with the Information Risk and Assurance Team as part of the projects,
procurements and in any required sharing of information. 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☒  
Page 13 of 110

Page 14

5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
All infrastructure projects developed by the council as part of the GCR City Deal will
be subject to relevant environmental and sustainability appraisal and as part of the
design process and subsequent planning application approvals and procurement.   
Furthermore, to adhere with HM Treasury Greenbook best practice, each iteration of
project business case seeking GCR City Deal funding will include a review of the
sustainability considerations, this will include carbon management, involving
categorisation, assessment and mitigation. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The City Deal programme and the delivery of the projects will continue to be
promoted through Corporate Communications and the Glasgow City Region’s
Communications team.   
For the East Airdrie Link Road, a joint communication plan will be developed with
NHS Lanarkshire and North Lanarkshire Council to coordinate communication,
stakeholder engagement and promote the projects as they develop.   
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
A key risk for the City Deal Programme is the current global economic climate and
its short and long term impacts on the delivery of the city deal projects.  This risk is
becoming a live issue for the Programme and will be assessed and recorded within
the City Deal Issues Register. This is not unique to City Deal and the approach to
this risk and issue management will be carried out in conjunction with Finance and
the Glasgow City Region Project Management Office.   
Due to the scale and complexity of the East Airdrie Link Road and Ravenscraig
Access Infrastructure South there is a risk of increased costs as a result of price
inflation and risk to full delivery if the programmes are delayed due to factors such
as technical and stakeholder approvals and land acquisition. 
Risk management of North Lanarkshire’s City Deal activity is incorporated within
the council’s City Deal programme risk register which is reviewed by the City Deal
Manager and reported to the council’s City Deal Board.  The City Deal risks are
also integrated in the Planning and Regeneration Service Risk Register.  Each City
Deal sub project has a detail risk register and is managed by the Project Manager. 
Page 14 of 110

Page 15

5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
A Children’s Rights and Wellbeing Impact Assessment has been carried out for
East Airdrie Link Road due to the interface the project has on Caldervale High
School.  The EALR project team are engaging with Education and the Head
Teacher on the Project. 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☒ No ☐ 
Page 15 of 110

Page 16

Page 16 of 110

Page 17

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref     PH/CB Date 21/08/26 
Visitor Levy and Visitor Strategy Update 
From  Pamela Humphries, Chief Officer (Place)  
E-mail Caroline Brown, browncar@northlan.gov.uk 
Executive Summary 
The Visitor Levy (Scotland) Act 2024 gives local authorities the power to introduce a levy
on overnight accommodation, with revenue re-invested in local services and tourism
infrastructure. With the Council’s 2022-26 Tourism Strategy due for renewal this year,
consideration of a visitor levy for North Lanarkshire provides opportunity to develop a new
Visitor Strategy alongside a levy framework, to determine whether to proceed to public
consultation.   
This report summarises tourism development activity delivered to date in line with the
Council’s 2022-26 Tourism Strategy, including UK Shared Prosperity funded projects. It
also sets out a recommended approach for considering a visitor levy by twin tracking the
shift to a new 10-year Visitor Strategy along with the development of a Visitor Levy
Framework for consultation. 
The Visitor Levy offers potential benefits, including sustainable funding for destination
development, but requires careful design to avoid negative impacts on competitiveness
and visitor demand. 
Recommendations
It is recommended that the Enterprise and Fair Work Committee: 
(1) Acknowledge progress of the North Lanarkshire Council Tourism Strategy and
Action Plan 2022 – 2026 and related UK Shared Prosperity Fund Outcomes
(2) Endorse the twin tracked approach to the development of a 10-Year Visitor Strategy
and Visitor Levy Framework for consultation. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (21) Continue to identify and access opportunities to leverage
additional resources to support our ambitions
Programme of Work Statutory / corporate / service requirement
Item 3
Page 17 of 110

Page 18

1.    Background 
1.1 North Lanarkshire Council’s Tourism Strategy and Action Plan 2022–2026 was
approved at Enterprise and Growth Committee on 3 Feb 2021. The Strategy aims to
make the area a sustainable and accessible destination that offers authentic
experiences and good value. The strategy supports the Plan for North Lanarkshire and
focuses on three key themes: Business, People & Skills and Place. It also encourages
collaboration with partners such as VisitScotland and supports the area marketing
brand, Visit Lanarkshire, to deliver marketing campaigns and improve the visitor
experience. Visit Lanarkshire is an initiative funded by both North and South
Lanarkshire Councils. 
1.2 The Visitor Levy (Scotland) Act 2024 gives local authorities the power to introduce a
levy on overnight accommodation, with funds reinvested into services and
infrastructure that benefit visitors and communities.  The Act was passed by the
Scottish Parliament in May 2024 and received Royal Assent in July 2024 granting
Councils the legal authority to introduce a levy.  The amount of the levy, either fixed or
percentage rate, would be part of the full public consultation. Previous consultations
from other Local Authorities have included a range of options from 5% to 7%, and
options for exemptions and offsetting of costs for accommodation providers. Local
Authorities must conduct a formal 12-week consultation, followed by an 18-month
implementation period prior to introducing a visitor levy. The consultation can be longer
than 12 weeks if required. 
1.3 At the request of the Council’s Finance and Resources Committee in September 2024,
an established Visitor Levy Working Group has continued to investigate the potential
for introducing a Visitor Levy within North Lanarkshire.  The working group,  consisting
of cross service officer representation, has considered the potential impact of
introducing a levy, including soft engagement with the business community and
learning from the early launches of other local authorities; as well as considering the
cost implications of set up, administration and monitoring of a levy scheme versus the
likely revenue to be generated. The Finance and Resources Committee of 10
September 2025 noted that a recommendation on how a potential Visitor Levy would
proceed will be reported to a future meeting of the Policy and Strategy Committee.  
2. Report 
2.1 North Lanarkshire Tourism Strategy and Action Plan (2022 – 2026) 
The Strategy identified 3 priority themes to support the vision, recovery and growth of
North Lanarkshire’s Tourism sector. These captured the main opportunities and 
challenges faced by the sector locally and included: 
• Priority 1 – Business
• Priority 2 – People and Skills
• Priority 3 – Place 
A detailed Action Plan sets out how outcomes against each of these priority themes
would be progressed and which partners would be involved in delivering against each
action. Section 4 of this report provides a link to the Tourism Strategy and Action Plan. 
2.2 The approved UK Shared Prosperity Fund Investment Plan for North Lanarkshire
provided funding through two interventions to support the marketing, promotion and
development of the tourism sector in North Lanarkshire. A total of £310,000 was
allocated to these activities from April 2023 up to 31st March 2026 and included:
Page 18 of 110

Page 19

• £160,000 to provide support for local tourism marketing to increase visitors and
support employment in the sector. 
• £150,000 to deliver a challenge fund in 2024/25 to support the development of
tourism facilities in North Lanarkshire.
2.3 Priority Themes: 
2.3.1 Tourism Strategy actions have been subject to ongoing monitoring and a full outcome 
report detailing what has been delivered between 2022-26 will be available in Spring 
2027.  Highlights reported so far include:     
Priority 1 – Business 
Aim: We will build business resilience, sustainability and profitability 
2.3.2 The baseline of tourism businesses in North Lanarkshire has been updated, in large 
part due to the implementation of the short term lets legislation. This tells us that in 
North Lanarkshire: 
• 30 Hotels are operational with some planned expansions
• 286 Bed and Breakfast/Self-catering units recorded (up from 19)
• 3 Campsites are operational
• 37 Visitor attractions exist (including 6 parks and gardens)
2.3.3 The Business Gateway Lanarkshire service engaged with and supported 51 new start  
and existing tourism businesses in North Lanarkshire between 2022 and 2026.
2.3.4 Tourism businesses can utilise free bespoke guides and templates developed by Green
Tourism with North and South Lanarkshire. Individual ‘green stories’ can be uploaded
and featured on the visitlanarkshire.com website. 
2.3.5 Attracting new and international customers by working with the travel trade is key to
growth for local accommodation and attractions. Tourism businesses are supported by
the enterprise team and VisitScotland to develop their trade product and attend
VisitScotland Connect annually. 
2.3.6  Tourism is defined as a key industry sector in North Lanarkshire and eligible   
businesses can apply for Business Growth Fund grants of up to 
£20,000 value (currently). Four businesses have been successful in accessing 
financial support for growth and investment projects between 2022 and 2026. 
UK Shared Prosperity Fund - Tourism Challenge Fund 
2.3.7 The fund was delivered during 2024/5 and designed to support up to 15 projects. 
Successful bidders were eligible for up to £10,000 funding to improve tourism 
facilities. Ten organisations were supported and included a range of projects which 
increased visitor numbers to North Lanarkshire 
Page 19 of 110

Page 20

Priority 2 - People and Skills
Aim: We will attract, develop, and retain a skilled, committed, diverse and
valued workforce. 
2.3.8 North Lanarkshire’s Working employability programmes support people with 
barriers to employment to find work. Posts in tourism and leisure businesses were 
filled as follows: 
• 2022/2023 – 35 posts supported (£128,201 wage subsidy value)
• 2023/2024 – 18 posts supported (£65,559 wage subsidy value) 
• 2024/2025 – 18 posts supported (£65,184 wage subsidy value) 
• 2025/2026 - 11 posts supported (£50,277 wage subsidy value) 
Total:  82 posts supported to the value of £309,221 in wage subsidies 
Note:  the reduction in  numbers reflects participant businesses being required to pay
the Real Living Wage from 2025 which has led to a reduction in applications for support. 
2.3.9 Businesses within the tourism sector are encouraged to adopt fair work practices 
including paying the real living wage, joining the Disability Confident Scheme and 
signing up to the North Lanarkshire Employer Charter. 
Priority 3 – Place
Aim: We will create and develop an attractive, competitive, and sustainable
destination that offers authentic and memorable experiences. 
2.3.10 Through the Place theme, the council seeks to further develop the potential of 
council owned venues to provide first class facilities and enhanced customer 
experience. 
2.3.11 Country Parks for the Future is a ten year plus delivery plan for greenspaces 
and includes: 
• £16m investment in the redevelopment of the Watersports Centre
• Velo Park at Bellshill Gateway, one of the largest pump tracks in Scotland,
funded by £1.6 million of investment from the Cycling Facilities Fund
• Interactive map of Strathclyde Country Park developed
• Palacerigg – Community Asset Transfer of visitor centre and café
• Colzium and Drumpellier Country Parks have tendered for private contractors
to run the onsite cafes. 
2.3.12  VisitLanarkshire.com continues to be the call to action for seasonal marketing 
campaigns. The objective is to raise awareness of Lanarkshire as a convenient visitor 
destination for a range of quality day trip (or short break) experiences with key target 
audiences. Between May 2025 to April 2026, VisitLanarkshire.com had 206,537 users
and 418,958 page views.  
Page 20 of 110

Page 21

UK Shared Prosperity Fund - Place Development 
2.3.13 The Tourism Campaigns project ran from 2023 to 2026 with budget allocated as 
follows:  
Apr 2023 – Mar 2025 Budget Total Spend
North Lanarkshire Stories £96,244 £85,525.60
Parks App £6,955 £6,955
VisitLanarkshire £16,800 £16,800
Apr 2025 – Mar 2026  
VisitLanarkshire £40,000 £40,000
TOTAL: £159,999 £149.280.60  
2.3.14 The North Lanarkshire Stories project commissioned ten original stories featuring ten
characters in ten time periods (from the Romans in 165 CE to modern day) set in ten
locations. Bespoke signage was installed with QR code to access the stories and an
interactive chat facility. Launched in 2025, the subsequent advertising campaign
included radio, outdoor advertising (billboards) in Glasgow city centre as well as digital
format online ads and a flyer. In addition, a wall mural and maquette of the signage
have been installed in North Lanarkshire Heritage Centre to further promote the
attraction. So far over 25,799 page views to the North Lanarkshire Stories webpage
have been recorded and 1043 user engagements with the QR codes on the physical
signage. 
2.3.15 Visit Scotland Connect is the largest travel trade event aimed at bringing Scottish
suppliers together with international and UK buyers. Visit Lanarkshire attended the
event held at Aberdeen Conference Centre in 2023, 2024 and 2025. In 2026 Connect
took place in the SEC Glasgow and Visit Lanarkshire had a destination stand and full
diary of 40 meetings over 2 days with a range of buyers from the travel trade. All
meetings were individually followed up and support with contacting any of our hotels
and attractions offered. 
2.4 Development of a Visitor Strategy and Visitor Levy Framework for Consultation 
2..4.1 The Visitor Levy Working Group has undertaken extensive preparatory work to help
inform future decisions for introducing a levy. This includes engagement with the
Scottish Government and VisitScotland on legislation and guidance available, and
monitoring progress and challenges faced by other local authorities. The table below
highlights the formally approved and announced Visitor Levy Schemes in Scotland. 
Area Rate Start date Details
City of Edinburgh
Council 5% 24 July 2026
Max 5 nights stay, 2% to be
retained by accommodation
providers
Glasgow City Council 5% 25 Jan 2027 Full stay, 1.5% to be retained by
accommodation providers
Aberdeen City Council 7% 1 April 2027 Full stay, 2.5% to be retained by
accommodation providers
Page 21 of 110

Page 22

2.4.2 The Working Group has undertaken initial modelling with the Glasgow City Region
Intelligence Hub to estimate the potential level of levy income using CoStar data. This
early analysis suggests that a Visitor Levy of 5% could generate in the region of £2m
per annum; however, this figure remains indicative and subject to further validation,
refinement and consideration of scheme operating and administration costs. In addition
to collection platform costs outlined in the next paragraph, legislation allows for local
authorities to retain the cost of administration and operating the scheme from income
generated. 
2.4.3 There is potential to explore the use of a shared Visitor Levy collection platform
currently under development by the Improvement Service. The system appears user
friendly and is intended to integrate with the Council’s Biz account (which is currently
being onboarded).  The collection platform will enable payments via BACS and includes
debt management functionality should this be required. 
2.4.4 Recognising that engagement with stakeholders and transparent communication will
be critical to the success of a visitor levy scheme, a business engagement session was
held in September 2025 with local hoteliers and tourism operators. 
2.4.5 Participants were invited to discuss the potential impact of a Visitor Levy on their
businesses. Feedback highlighted: 
• Concern price increases could adversely impact demand and occupancy
• Perception businesses would not directly benefit from the Visitor Levy 
• Businesses lack awareness of local attractions
2.4.6 This event has since been followed up with the circulation of a business survey to local
tourism businesses. The survey ran during November and December 2025 and 39
responses were received. A review of responses indicates that 57% of responders
either disagree or strongly disagree with the principle of undertaking consultation on a
Visitor Levy in North Lanarkshire.  33% agree or strongly agree. The remaining 10%
were neutral. In response to what would benefit tourism businesses/enable them to
grow, this provided insight as follows: 
• Financial Support for investment – 54%
• Increased area marketing – 49%
• Information on visitor trends/insights – 36%
• Consultancy support/Expert Help – 31%
• Support with digital skills – 23%
• Other – 21% 
Stirling Council 3% 14 June 2027 Max 7 nights stay; residents
exempt
West Dunbartonshire
Council 5% 1 July 2027 Full stay, 1.5% to be retained by
accommodation providers
Highland Council  Plans on hold Consultation closed 31 March 2025 
Argyll and Bute Council  Plans on hold Consultation closed 10 April 2025  
Page 22 of 110

Page 23

2.4.7 The needs of businesses to feel a benefit from the scheme, combined with changing
visitor trends has prompted a shift in focus from the existing tourism strategy to a
broader Visitor Strategy that could potentially be underpinned by a Visitor Levy that is
supported by tourism businesses. This new approach will seek to capture how revenue
generated from a Visitor Levy could potentially be reinvested to enhance infrastructure
and experiences for all visitor types while aligning with support for business
sustainability, growth, skills and job creation in the visitor economy sector.
Strengthening local knowledge and creating a more connected visitor offer through a
Visitor Strategy that is fit for purpose and delivers benefits for both visitors and
businesses will also help demonstrate how a Visitor Levy could help provide and
accelerate these offers. 
2.4.8 To progress this approach, external consultancy support with suitable expertise has
been procured to develop a new Visitor Strategy. The commission set out requirement
for robust research and analysis informed by local data and statistics, detailed sector
intelligence, and structured engagement with tourism, hospitality and leisure
businesses, alongside other relevant stakeholders. In parallel, the consultancy will
assess how a potential Visitor Levy could support the Visitor Strategy, including
consideration of the scale and potential use of levy income, alignment with strategic
priorities, delivery and governance mechanisms and longer-term investment
requirements. The findings of this work will provide an evidence base to inform the
Council’s decision on whether to proceed to a formal public consultation on the
introduction of a Visitor Levy
2.4.9 It is currently anticipated that the Draft Visitor Strategy and Draft Visitor Levy scheme
will be reported to Policy and Strategy Committee in cycle 4.  If there is approval in
principle to take forward a Visitor levy it is anticipated the formal consultation would
take place early 2027. 
3. Measures of success 
3.1  The development of a new 10-year Visitor Strategy (2027-37) that contributes to wider
economic and place-making objectives.   
3.2 Consultation on the potential to introduce a Visitor Levy Scheme to North Lanarkshire
which could generate additional investment to benefit the local visitor and tourism
economy. 
4.  Supporting Information 
4.1  North Lanarkshire Council Tourism Strategy and Action Plan (2022-26) 
Tourism Strategy and Action Plan . 
Pamela Humphries
Chief Officer (Place)
Page 23 of 110

Page 24

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
A full EQIA will be undertaken as part of the strategy development and draft Visitor
Levy Scheme. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Cost to appoint an external consultant to assist with the development of a Visitor
Strategy and Visitor Levy Scheme have been met from existing resources.  
A Visitor Levy could potentially generate income for re-investment to support North
Lanarkshire’s visitor economy.  Potential costs associated with implementation of a
Visitor Levy will be considered as part of future reports. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
Page 24 of 110

Page 25

5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
A full communications strategy will be required should the council proceed to
consult on the Visitor Levy. Corporate Communications is also actively engaged in
the working group   
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
High level risks have been discussed by the working group and a full risk
assessment will be undertaken in advance of consultation and potential future
delivery.    
Page 25 of 110

Page 26

5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 26 of 110

Page 27

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    MH/PH Date 21/08/26 
Economic Regeneration Delivery Plan and Performance
Framework – Annual Progress Report 
From  Mark Hynds, Economic Analyst  
E-mail hyndsm@northlan.gov.uk Telephone Mark Hynds 
07583 023248 
Executive Summary 
The purpose of this report is to update Enterprise and Fair Work Committee on progress
made to date towards the implementation and delivery of North Lanarkshire’s Economic
Regeneration Delivery Plan (ERDP) and associated Action Plan. The Action Plan is
updated annually, and this progress report details activity as at financial year end 2025/26. 
This report also presents the latest ERDP Performance Framework update which is used 
to monitor wider ERDP performance over the short, medium and longer term (through to 
2035). Unlike the ERDP Action Plan, figures within the Performance Framework are 
reported on a cumulative basis to show the progress against the longer-term ambitions of 
the ERDP. 
Recommendations
It is recommended that the Enterprise and Fair Work Committee: 
(1) Note the content of this report and progress made towards the delivery of the 2025/26
ERDP Action Plan, which was approved by Enterprise & Fair Work Committee in
February 2025. 
(2) Acknowledge the wider progress and performance against the ERDP 2023-2028. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement
(2) Refocus our town centres and communities to be multi-
functional connected places which maximise social, economic,
and environmental opportunities
Programme of Work Transforming Places
Item 4
Page 27 of 110

Page 28

1. Background 
1.1 The Economic Regeneration Delivery Plan (ERDP) aims to help co-ordinate physical
and economic regeneration activity across North Lanarkshire, increase economic
output and help address social and economic inequality. 
1.2  The ERDP was initially approved by the Enterprise and Growth Committee in August
2019, covering the period 2019-2023. A light-touch refreshed ERDP, covering the
period 2023-2028, was then approved by Enterprise and Fair Work Committee in
February 2023. 
1.3  Since 2019, an Action Plan to support the delivery of the ERDP through a range of key
measures and investment programmes has also been produced and approved each
year by committee. The Action Plan sets the priorities for the financial year ahead,
reflecting progress made to date and the evolving priorities of the council. 
1.4  The 2025/26 Action Plan was approved by Enterprise and Fair Work Committee in
February 2025 and the current 2026/27 ERDP Action Plan was approved in February
2026. 
1.5  An accompanying ERDP Performance Framework was approved by Enterprise and
Growth Committee in February 2021. This comprises of a group of performance
indicators at three levels. These indicators aim to collectively provide an overview of
how the North Lanarkshire economy is performing as well as helping us to understand
the impact that the delivery of the ERDP is having on improving economic opportunities
and outcomes for all. 
2. Report 
2.1 Economic Regeneration Delivery Plan 2023-2028 
2.1.1 The refreshed ERDP continues to focus on the same four key inter-related themes as
the 2019-23 plan:
• Developing housing that promotes improved quality of life and creates a better
place to live;
• Reshaping our town centres to ensure that these provide modern and attractive
centres that meet the needs of our communities;
• Improving our business and industrial infrastructure, creating opportunities for
investment and for companies to start-up or relocate here; and
• Continuing to improve our connectivity and develop new opportunities by
transforming our road, rail and digital infrastructure. 
2.1.2  To support the delivery of these objectives, annual ERDP Action Plans have been
developed each financial year since 2019/20. 
2.2 2025/26 Action Plan – Performance Review 
2.2.1 Appendix 1 provides an update on the ERDP Action Plan objectives and targets
achieved during 2025/26. 
2.2.2 Significant progress continues to be made against the ERDP’s key objectives with
highlights during 2025/26 including: 
Page 28 of 110

Page 29

• The purchase of an additional 125 homes via the Open Market/Empty Homes
Purchase Scheme (OMPS). Combined with new builds and previous OMPS
purchases, this takes completions to a total of 2,600 homes at 31 March 2026. 
• In additional to the New Supply Programme, 714 private tenure homes were also
completed across North Lanarkshire. 
• A Regeneration Plan for Coatbridge and an associated initial 4-Year Investment
Plan was developed and submitted to UK Government, which was subsequently
approved in March 2026 as part of their Pride in Place Programme which will see
up to £20 million invested in Coatbridge over the next decade. 
• The demolition of Fleming House was completed in Summer 2025, marking a
significant milestone in the regeneration of Cumbernauld town centre. 
• Construction commenced on redeveloping the former Motherwell Town Hall into 20
homes for social rent, as part of the New Supply Programme. 
• £1.45 million was secured from the National Lottery Heritage Fund as part of the
Rediscovering Airdrie project. An application seeking a further £1.2 million from
Historic Environment Scotland was also submitted, with a decision pending. This
funding will be used to redevelop Airdrie Library and provide third-party grants to
eligible properties as part of a Shopfront Improvement Scheme and a Repair &
Conservation Scheme to architecturally significant buildings within the scheme
area, part of Airdrie town centre. 
• Via Fusion Assets, construction of Building 3 at Link Park, Newhouse, was
completed in December 2025, delivering over 19.000 sq.ft of new industrial space.
This property was let on completion, resulting in 50 new jobs for North Lanarkshire. 
• North Lanarkshire Council secured £11.287 million from Glasgow City Region’s
Enabling Commercial Spaces to fund two Fusion Assets projects at Ravenscraig
Enterprise Park and Westfield Point, Cumbernauld. 
• Various active travel improvements were delivered, including construction of
Glasgow Road Phase 3, Wishaw (SNR3) and Phase 1 and 2 at Bellziehill
Roundabout (SNR8). 
2.3 ERDP Performance Framework 
2.3.1 The ERDP Performance Framework also highlights significant progress in improving
economic opportunities and outcomes for North Lanarkshire’s residents and
businesses. Highlights achieved as of 31 March 2026 include: 
• 1,630 new build council homes complete, with a further 375 homes for social rent
currently under construction as part of the New Supply Programme.
• 970 homes brought into council ownership via the Open Market Purchase Scheme,
including some homes previously sold under the Right to Buy.
• £132 million invested in town centre (including edge of town) developments, of
which more than £61.9 million was secured via external funding sources.
• Town Action Plans (TAPs) approved for Airdrie, Bellshill, Kilsyth, Motherwell, Shotts
and Wishaw. With a review scheduled for 2026/27, including the development of a
Page 29 of 110

Page 30

TAP for Coatbridge, following the recent approval of the Regeneration Plan for
Coatbridge.
• 1,848 new affordable town centre homes completed (including edge of town sites) 
by the council and housing associations. This includes developments across most 
of our towns with completed sites including the former Orrs building, South Bridge
Street (Airdrie), Caledonian Avenue (Bellshill) ,Church Court (Coatbridge), 95 Main
Street (Kilsyth), Brandon Street (Motherwell), the former Kingfisher Building,
Dowanfield Road (Motherwell) and Roberts Street (Wishaw), amongst others.
• 198,960 sq.ft of business and industrial workspace created or refurbished as a 
result of investment by the council,  Fusion Assets and North Lanarkshire
Properties (NLP).
• £63.6m invested in key road infrastructure projects funded via the council and the
Glasgow City Region City Deal.
• 22.7km of active travel routes created or enhanced. 
3. Measures of success 
3.1  The purpose of this report is to highlight the key actions, targets and indicators that are 
used to measure and monitor the delivery of the ERDP through the ERDP Action Plan 
and Performance Framework   
4. Supporting documentation 
4.1 Appendix 1:  Economic Regeneration Delivery Plan (ERDP) Action Plan 2025/26 –
End-Year Performance report 
4.2 Appendix 2: ERDP Performance Framework (June 2026) 
Pamela Humphries
Chief Officer (Place) 
Page 30 of 110

Page 31

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 31 of 110

Page 32

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Risks are recorded and managed within Corporate Risk Register.
Key risk is failure to deliver on the ERDP and its objectives of helping co-ordinate 
physical and economic regeneration activity across North Lanarkshire, failing to
increase economic output or address social and economic inequality. 
This would result in the loss of additional economic and social benefits to residents
and businesses across North Lanarkshire and significant reputational damage to
the Council given the widespread public nature of the programme. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 32 of 110

Page 33

Appendix 1 
ERDP Action Plan 2025/26
End-Year Performance Report 
Page 33 of 110

Page 34

Theme: Live
ERDP Priority 1: Developing housing that promotes improved quality of life and creates a better place to live
Ref ERDP Action 2025-26 Target What we achieved (2025-26) RAG
1.1
Continue to focus
investment towards the
council’s affordable
housing stock to make
sure that the target of
6,000 new council
homes for North
Lanarkshire is reached
by 2035
Completion of 53 new build homes during
2025/26
The completion of the new build
developments that were estimated to
complete in 2025/26 unfortunately slipped
into Quarter 1 2026/27, bringing the total
new builds due for completion in 2026/27 to
169. 
As at end of 2025/26, 2,600 new council
homes are complete (including Open
Market Purchase Scheme). 
Red
1.2
Begin construction of six new build
developments, totalling 140 homes during
2025/26
During 2025/26, construction of 7 new build
developments commenced. 
375 homes are currently under
construction.
Green
1.3 120 Open Market/Empty Homes Purchase
Scheme completions during 2025/26
125 Open Market/Empty Homes Purchase
Scheme completions during 2025/26.  Green 
1.4 Complete the acquisition of 20 new build off
the shelf units during 2025/26
No affordable homes were delivered off the
shelf via private developers in 2025/26. 
Currently, 3 projects, with a total of 127
homes, are due to be delivered via off the
shelf purchases by 2029.
Red
1.5a
Continue to support the
delivery of the affordable
housing programme,
including intermediate
tenures such as mid-
market rent
Prepare the 2026/27 SHIP which will identify
sites to meet Local Housing Strategy priorities
and maximises the use of available Scottish
Government grant funding. Support the
delivery of sites within the current 2024/25
SHIP 
SHIP (2026/27 – 2030/31) formally
approved and published on NLC website. 
The Scottish Government’s outturn report
has not yet been published, but it’s
projected that North Lanarkshire fully spent
the RPA allocation in 2025/26, supporting
completion of 118 new affordable homes.
Green
Page 34 of 110

Page 35

Support the delivery of sites within the current
2025/26 SHIP and spend full Resource
Planning Assumption (RPA) allocation
1.5b
Develop proposals for mid-market rent
projects(s) linked to town centre regeneration,
subject to available funding
Proposals to develop a mid-market rent
(MMR) model were approved at Policy &
Strategy committee in June 2026 as part of
the review of the council’s Programme of
Work priorities.  Further detail on the
proposed model will be reported to a future
Housing Committee. 
1.6a
Enable private sector
housing development to
support the local
economy and the
regeneration of strategic
sites such as
Ravenscraig
709 private tenure units estimated to be
completed during 2025/26
714 new private homes were delivered
across North Lanarkshire during 2025/26.  Green
1.6b Complete review of 2025 Housing Land Audit
2025 Housing Land Audit (HLA) completed
and draft 2026 HLA currently under
development. The review of the housing
land supply continues as part of the HLA
process and the preparation of the next
Local Development Plan. 
Green
1.6c Progress new Local Development Plan
An Evidence Report for the new Local
Development Plan (LDP) was progressed
during 2025/26 and the Evidence Report
was submitted to Scottish Government, late
June 2026 for approval. 
It is anticipated that the new LDP – North
Lanarkshire Local Development Plan 2
(NLLDP2) will be prepared and adopted in
2028.
Green
1.6d Launch Invest in NL service to help facilitate
and accelerate investment in new housing
During 2025/26, 15 housing proposals
received pre-application advice through
Invest NL. Of these applications, 4 were
submitted by the private sector. All 4 of the
applications related to major housing
Green
Page 35 of 110

Page 36

developments i.e. for 50 or more
dwellinghouses. 
Theme: Invest
ERDP Priority 2: Reshaping our town centres to ensure they provide modern and attractive centres that meet the needs of our
communities
Ref ERDP Action 2025-26 Target What we achieved (2025-26) RAG
2.1
Establish and commence
delivery of Town Action
Plans for all eight town
centres (aligned with our
approved Town Vision),
agreeing short, medium
and long-term
investment plans for
each
Town Action Plan Performance Framework to
be developed with annual progress reports to
be presented to Enterprise & Fair Work
Committee
A Town Action Plan update report was
presented to Enterprise & Fair Work
Committee in November 2025. 
Town Action Plans are due to undergo a
review, involving a programme of public
consultation during Autumn 2026.
Green
2.2
Continue to support Coatbridge Town Board
to deliver on the approved Long-Term Plan for
Coatbridge. 
Finalise Long Term Plan for Coatbridge and
initial 3-year Investment Plan and submit to
UK Government
Following the 2024 General Election, the
UK Government relaunched the fund under
the Pride in Place Programme. Coatbridge
will receive up to £20m funding over a 10-
year period. 
In line with fund guidance, a Regeneration
Plan for Coatbridge was developed and
submitted to UK Government in November
2025. This also included an accompanying
initial 4-Year Investment Plan. 
The Regeneration Plan and Investment
Plan were approved in March 2026, and the
delivery phase of the programme
commenced in April 2026, in line with fund
timescales. 
Green
Page 36 of 110

Page 37

2.3
Continue with The Centre Cumbernauld
project, including procurement of an architect
led design team during 2025/26, who will aid
the development of the Masterplan 
Conclude the procurement of the new long-
term management agent for The Centre
Cumbernauld. 
Progress demolition strategy including
procurement of specialist demolition
consultant.
The regeneration of Cumbernauld town
centre continued to make significant
progress during 2025/26. 
The demolition of Fleming House
completed in August 2025, marking a major
milestone in the regeneration of the town.
This space has been developed into a
temporary carpark for public use over the
next few years. It will then be used by
contractors for site access during the
second stage of demolition of The Centre
Cumbernauld.   
Following a procurement process,
Gatehouse Property Management (GPM),
were appointed as the long-term
management agents for The Centre
Cumbernauld, which should see continuity
of service until full closure of The Centre. 
Demolition strategy progressed during
2025/26 with first stage of demolition
estimated to take place in 2027. 
Green
2.4
NLC and RSLs to deliver 59 new affordable
homes within our town centres (including
edge of town) during 2025/26
77 units delivered during 2025/26 at town
centre/edge of town developments
including:
• Mill Loan, Airdrie (CVHA)
• Lennox House, Cumbernauld
(Sanctuary)
• Bank Street, Coatbridge (Wheatley
Group)
Green
Page 37 of 110

Page 38

2.5
Appoint main contractor and commence
works on site to redevelop the Category C
Listed, former Motherwell Town Hall to
residential units for social rent as part of the
New Supply Programme 
Commence demolition of the old main hall
and undertaken external repairs
During 2025/26, construction commenced
on redeveloping the former Motherwell
Town Hall into 20 homes for social rent. 
Demolition and repair works were
completed and major internal fit out works
are being progressed. 
The project is due to complete in early
2027.
Green
2.6
Continue to prioritise
funding and secure
external investment for
the regeneration of our
town centres
Await confirmation of the Scottish
Government’s Placed Based Investment
Programme (PBIP) and anticipated allocation
for 2025/26.
NLC was allocated a total of £1.698m via
the Scottish Government’s Place Based
Investment Programme for 2025/26, which
was to be paid in two tranches. The first
tranche of £1.329m was received and was
fully contractually committed. 
This funding was allocated towards projects
such as Kilsyth flood prevention and
Braidhurst Industrial Estate. 
The second tranche of 2025/26 PBIP
funding (£368k) was not received due to
Scottish Government funding constraints.
NLC had planned for this scenario and as
such, these funds had not been allocated to
any specific projects to avoid a funding
shortfall.   
2025/26 marked the end this five year
programme which has resulted in NLC
receiving £7.717m from this Scottish
Government fund across the lifespan of the
programme. It is not currently anticipated
that there will be further PBIP funding.  
Green
Page 38 of 110

Page 39

2.7a
Submit funding applications to Historic
Environment Scotland (HES) and National
Lottery Heritage Fund (NLHF) for up to £2.5
million. 
Subject to a successful funding award,
commence delivery of the Rediscovering
Airdrie project which may include:
• the refurbishment and enhancement of
Airdrie Library
• a shopfront improvement scheme
through grants to local property
owners
Two delivery phase funding applications
were submitted during 2025/26 to:
• National Lottery Heritage Fund,
seeking £1.45 million. Confirmation
of a successful bid was announced
in December 2025.
• Historic Environment Scotland’s
Heritage & Place Programme,
seeking £1.2 million. The outcome
of this bid is currently pending. 
Project delivery will not commence until all
required external funding has been
secured.
Green
2.7b
Continue to promote and engage with local
community organisations to enable external
funding applications to third party
regeneration funds, where appropriate (e.g.
Scottish Government’s Regeneration Capital
Grant Fund)
During 2024/25, the City Deal &
Regeneration team engaged with local
community groups to develop bids towards
the Scottish Government’s Regeneration
Capital Grant Fund (RCGF) and Vacant
and Derelict Land Improvement Programme
(VDLIP). However, due to budgetary
constraints, these funds were temporarily
paused during 2024/25, and no new awards
were granted. 
These funds have since restarted, and
North Lanarkshire has received a
conditional award of grant of £735k towards
the community led Cumbernauld Village
Blue-Green Space project.   
Green
2.8
Review how NLC can be
more effective in
addressing failing
buildings in our town
centres
Continue to engage with local property/land
owners with a view to acquiring key town
centre properties / sites earmarked for
conversion / redevelopment 
Officers continued to engage with various
property/landowners during 2025/26, to
enable key town centre projects to
progress. 
Green
Page 39 of 110

Page 40

Where necessary, commence CPO
processes, as a last resort, if failure to
purchase a site would be detrimental to town
centre regeneration plans
North Lanarkshire Council acquired
properties in Coatbridge, Cumbernauld and
Wishaw during 2025/26, as part of
unlocking development opportunities within
these town centres. 
With nine of the required ten properties
acquired at Main Street Coatbridge, the
Council has been unable to voluntarily
acquire the last remaining private property.
A report was approved at Planning
Committee in June 2026 to progress a
Compulsory Purchase Order. 
Theme: Work
ERDP Priority 3: Improve our business and industrial infrastructure, creating opportunity for investment and for companies to
start-up or relocate here
Ref ERDP Action 2025-26 Target What we achieved (2025-26) RAG
3.1a
Promoting a mix of
development across our
motorway corridors and
accessible business
locations to support the
development of our
foundational economy as
well as high-end growth
Delivery of a relationship managed service
(Invest in NL) to support businesses through
the statutory consent process from enquiry to
pre-planning to operational establishment 
The Invest NL pre-application advice
service ensures consultation is carried out
with all relevant council services to ensure a
co-ordinated response is provided in the
Feedback Report issued to the applicant by
Invest NL. This ensures the applicant
receives appropriate advice for any other
Council consent process such as Roads
Construction consent and not just on
Planning.  Enterprise participation ensures
early and firm links are made with new and
expanding NL businesses, enabling access
to business support services (Business
Gateway, recruitment and funding), key
Green
Page 40 of 110

Page 41

council services and local partner
organisations, supporting long-term
business and economic growth.
3.1b
Development of Invest NL Prospectus and
marketing activities 
An Invest NL prospectus has been
developed. A digital video campaign
featuring recent inward investor businesses
continued to be rolled out through 2025/26.
Green
3.1c
Mapping of available key sites and properties 
Development of Business and Industry
Strategy which will inform sites identified for
inclusion in the Local Development Plan 
An evaluation of North Lanarkshire
industrial land and industrial premise/office
stock was undertaken by Ryden LLP during
2025 and reported to Committee in
Februray 2026.  This analysis will form the
basis for the development of the Business
and Industry Strategy and forms part of the
evidence report for the new Local
Development Plan. 
Green
3.1d
Strengthening links with North Lanarkshire
Properties and Fusion Assets to market and
identify and promote key properties, sites and
opportunities 
Fusion assets and NLP are closely involved
in the development of the Business and
Industry Strategy which will identify potential
future development opportunities. 
£11.3m additional funding has been
secured through the Glasgow City Region
Enabling Commercial Space funding which
support new business/ industrial space in
Ravenscraig and Cumbernauld. 
Green
3.1e
Delivery of support for filming locations and
enquiries through Lanarkshire Screen
Locations and North Lanarkshire Film Charter
Officer-led film location support continues to
be delivered through Lanarkshire Screen
Locations and the North Lanarkshire Film
Charter
Green
Page 41 of 110

Page 42

3.2
Continuing to support
enabling investment
which brings our vacant
and derelict land and
brownfield sites into
commercial use.
1.6 ha of land to be remediated or improved
by Fusion Assets for business and industry
use in 2025/26
Enabling works were completed at Gartcosh
and Link Park, Newhouse Green
3.3
Improving how we record
and respond to enquiries
from businesses to
provide a
coordinated approach
across relevant council
services to help attract,
retain and expand
business and
employment
opportunities.
Continue to progress delivery of the Invest in
NL Programme of work 
Continued rollout of a CRM enquiry system
The Invest NL pre-application advice
service is now established to help co-
ordinate statutory consents and enable
early engagement with potential new or
expanding businesses. 
Phase 1 of CRM enquiry system adoption
progressed in 2025/6.  A purpose-built grant
administration platform was developed for
use in the 2026/7 grant year.
Phase 2 adoption will see the enquiry
system launched and used for broader
business engagement use and reporting.
Green
3.4
Building upon work which
supports innovation and
skills development
through the development
of sectoral learning
academies.
Continue to deliver NL Academies projects
which are funded via UK Shared Prosperity
Fund (UKSPF) – subject to allocation of
funding 
Built Environment 
Three priority workstreams will be
progressed:
• The development and implementation
of phase 1 of the Built Environment
Academy.
• The development of a Youth
Engagement Strategy to engage and
attract young people into the sector.
• Research into the current and future
North Lanarkshire skills demand and
UKSPF projects continued during 2025-26
within the Brighter Futures team with almost
500 North Lanarkshire residents receiving
support to enter employment. 
Built Environment
During 2025/26, Brighter Futures
progressed delivery of priority workstreams
to support the development of the Built
Environment Academy. 
Phase 1 activity focused on employer
engagement and partnership development
across the sector (including education
sector) establishing governance
Green
Page 42 of 110

Page 43

workforce demand. This workstream
will also map the current supply chain
ecosystem to identify clusters of
expertise, areas of specialism and
potential for growth. 
Care 
The Steering Group will prioritise activity
under 4 workstreams:
• attraction, recruitment, retention and
wellbeing
• pathways to care for young people
• adult pathways to care
• funding and procurement. 
A focus on collaborative apprenticeships is
planned, along with ensuring pathways for
people to work in the care sector are
developed within these. 
Digital 
Work will be progressed to engage with
employers to gain a deeper understanding of
skills and workforce challenges and gaps
within this industry in North Lanarkshire to
direct activity towards addressing these gaps.
arrangements and shaping the scope and
delivery model for the Academy. 
Work was also progressed to inform the
development of a Youth Engagement
Strategy, including early engagement with
schools and partners to promote pathways
into the sector. Research activity was
undertaken to assess current and future
built environment skills demand within North
Lanarkshire and to map the local supply
chain, identifying key areas of skills need,
specialisms and opportunities for growth. 
Care 
Throughout 2025/26, the Care Academy
Steering Group prioritised activity across its
four agreed workstreams, with a strong
focus on attraction, recruitment, retention
and wellbeing within the care sector. 
Progress was made in developing clear
pathways into care for young people and
adults, aligning existing provision and
identifying opportunities to strengthen
progression routes. Collaborative working
with providers and partners supported the
development of apprenticeship pathways,
helping to improve access to employment
and training opportunities in the sector. 
Engagement also informed discussions
around funding and procurement challenges
impacting workforce sustainability.
Page 43 of 110

Page 44

Digital
During 2025/26, Brighter Futures
progressed some engagement with digital
employers across North Lanarkshire to
strengthen understanding of workforce and
skills challenges within the sector. 
This work aligned with wider economic
development activity, including early
engagement and collaboration between the
team and partners following the
announcement of the North Lanarkshire AI
Growth Zone. 
Moving forward, the Brighter Futures team
activity will ensure that future skills and
workforce activity is well-positioned to
support the development of AI-related
opportunities locally and to respond to
anticipated skills demand associated with
the Growth Zone.
3.5a
Supporting investment,
via our Arms-Length
External Organisations,
that will continue to
improve, modernise and
expand commercial stock
availability across North
Lanarkshire.
Seek to secure funding for Phase 2 at
Gartcosh Industrial Park and commence
construction of 3 new industrial units, totalling
69,000 sq.ft.
Detailed design continues and discussions
ongoing with Joint Venture partner to secure
investment for development of Gartcosh
Industrial Park, Phase 2. 
Amber
3.5b
Secure planning approval for Phase 4 at
Gartcosh Industrial Park which consists of a
40,000 sq.ft single user site.
Planning Approval for Phase 4 was granted
on 16th February 2026. Green
3.5c
Ravenscraig: 
Examine the feasibility of
undertaking a second phase of development
at the Ravenscraig Employment Zone. 
Not progressing as Ravenscraig Ltd have
granted Apatura option over the site.  Red
Page 44 of 110

Page 45

3.5d
Condor park, Eurocentral: 
Conclude Joint Venture, secure funding and
commence construction of 41,000sq ft of
industrial space 
Indicative loan offer secured but
development currently under review due to
viability concerns by potential joint venture
partner.
Amber
3.5e
Link Park, Newhouse: 
Complete construction of a 19,000 sq.ft
industrial unit which represents the third and
final phase of development on the site.
Construction of Building 3 at Link Park was
completed in December 2025 and was let
on completion to Ritchie Precision
Engineering resulting in 50 new jobs for
North Lanarkshire.
Green
3.5f
Secure share of £64.5m Glasgow City
Region funding to progress additional
business and industry regeneration projects
at Ravenscraig and potentially Cumbernauld
and Chapellhall.
North Lanarkshire Council secured £11.287
million from Glasgow City Region to fund
two Fusion Assets projects at Ravenscraig
Enterprise Park and Westfield Point,
Cumbernauld. 
Following a tender exercise, construction
work began in February 2026 on Phase 1 at
Ravenscraig Enterprise Park.
Green  
Page 45 of 110

Page 46

Theme: Invest
ERDP Priority 4: Continuing to improve our connectivity and develop new opportunities by transforming our road, rail and digital
infrastructure
Ref ERDP Action 2025-26 Target What we achieved (2025-26) RAG
4.1
Continue to deliver the
City Deal Infrastructure
Programme
Ravenscraig Access Infrastructure 
Continue to progress the delivery of
Ravenscraig Access Infrastructure project
to support the redevelopment and connect
the M74 and M8 as part of the Pan
Lanarkshire Transport Corridor. 
• Commence advance service diversion
works for the road construction.
Finalise the scope of advanced
groundworks and commence
procurement. 
• Prepare tender package for
construction of the dual carriageway
between Ravenscraig Regional Sports
Facility and Airbles Road/ Windmillhill
Street. 
Planning and design of utility services
diversions for Phase 1 commenced in
March 2026, with completion scheduled
for August 2026. 
Scope of services for advanced works 
was delayed due to the need to
undertake additional geoenvironmental
testing. It is anticipated works will now
commence in Autumn 2026. 
Detailed design for main works now
scheduled for completion by December
2026 and procurement to commence in
Spring 2027. 
Red
4.2
East Airdrie Link Road 
Continue to progress delivery of the East
Airdrie Link Road (EALR) to improve
North/South road and active travel
connectivity as part of the Pan Lanarkshire
Transport Corridor. 
• Complete preliminary design for the
road alignment.
• Commence land acquisition strategy.
In June 2025, Policy and Strategy
committee approved the inclusion of the
Towers Road Link within the scope of the
proposed East Airdrie Link Road project. 
Completed Preliminary Design for the
road alignment. 
Completed Section 1 Environmental
Impact Assessment (EIA) and continued
development of Full Scheme EIA.
Green
Page 46 of 110

Page 47

• Environmental Impact Assessment to
be completed.
• Submit Planning application for the
East Airdrie Link Road.
• Appoint consultants to progress design
development of East Airdrie Link Road
active travel. 
Pre-Application Consultations (PAC)
were held (Airdrie / Chapelhall /
Cumbernauld and Caldervale High
School). 
Submission of Section 1 planning
application (30 January 2026).  A second
planning application for full scheme was
submitted in June 2026. 
Commenced land acquisition strategy. 
Appointment of consultants for 
Specimen Design (Full Scheme)
estimated to be Autumn 2026. 
4.3
Orchard Farm Roundabout 
Progress delivery of the Orchard Farm
roundabout to support the development of
key business and industrial sites on the
A8/M8 corridor. 
• Finalise a funding agreement with the
private sector partnership for the City
Deal contribution to the project.
• Maintain regular dialogue with the
partnership to ensure progress
towards target procurement and
delivery dates in 2025 and 2026.
• Start preparing Full Business Case
(FBC) for submission to the Glasgow
City Region City Deal Cabinet, once
procurement programme is finalised.
Progress stalled during 2025/26 due to a
wider site infrastructure funding gap
notified by the developers of the
Mossend International Railfreight Park
(MIRP). 
The council is working with Scottish
Enterprise to explore options to support
the delivery of the roundabout and wider
site infrastructure.  This includes a bid to
the UK Government Strategic Sites
Accelerator programme. 
The construction start date for the
roundabout now estimated November
2027.  
Amber
Page 47 of 110

Page 48

4.4
Eurocentral Strategic Active Travel 
Progress delivery of the Eurocentral
Strategic Active Travel project. 
• Completion of detailed design and
tender preparation, options appraisal
and concept design commission.
• Commence works procurement for
Holytown to Eurocentral/Maxim and
Whifflet Corridor routes and submit
sub-project Full Business Case (FBC)
for approval by the Glasgow City
Region City Deal Cabinet.
• Commence construction.
• Commence procurement of detailed
design and tender preparation services
for Bellshill to Mossend route. 
2025/26 saw the completion of detailed
design, options appraisal and concept
design commission. 
Tender issue for Phase 1 of the project
has slipped to 2026/27 with construction
now expected to start in October 2026. 
Procurement of detailed design and
tender preparation services for the
Bellshill to Mossend route will also be
undertaken in 2026/27. 
Amber
4.5
Invest in the delivery of
the council’s Active
Travel Strategy to
ensure a comprehensive
connection of active
travel routes to key
places across North
Lanarkshire
Continue to develop the Active Travel
Strategic Network Routes (SNRs), in line
with external funding resources. 
Progress designs of:
• SNR9 (Airbles Road to South
Lanarkshire at Strathclyde Park
and to Bothwell)
• SNR7 (Uddingston to Caldercruix)
• SNR6 (Stepps to Condorrat) 
• SNR8 (Glasgow City Council
boundary on A74 to Newhouse)
• SNR1 (Coatbridge to Muirhead)
• SNR3 (North-South Corridor) 
Design: 
• SNR9 - Commenced route
optioneering to determine preferred
route through Strathclyde Country
Park. This work will continue into
2026/27. 
• SNR7 - Detailed designs were
completed for section Alexander
Street - Stirling Road. To be
constructed during 2026/27. 
• SNR6 - Concept design commenced
for with detailed design to follow
Green
Page 48 of 110

Page 49

Progress delivery of AT improvements:
• Glasgow Road Phase 3, Wishaw
(SNR3)
• Alexander Street Phase 2, Wishaw
(SNR3)
• Belziehill Roundabout Phases 1
and 2 (SNR8)
• Riverbank Hub Phase 3 and
Orbiston Hub Phase 1 and 2 local
links.
during 2026/27, dependent on
availability of funding. 
• SNR8 – Detailed design of the
section of SNR8 between Holytown
and Newhouse has been completed.
Construction will follow, dependent on
the availability of external funding. 
• SNR1 - Concept design commenced,
to be completed in 2026/27. 
• Detailed design of Orbiston Phases
2B and 2C commenced during
2025/26, continuing into 2026/27. 
Delivery:
• Construction of Glasgow Road Phase
3, Wishaw (SNR3) was completed
during 2025/26 
• Construction of Alexander Street
Phase 2, Wishaw (SNR3)
commenced during 2025/26 and due
for completion in summer 2026
• Construction of Phases 1 and 2
(SNR8) at Bellziehill Roundabout
completed in October 2025.
• Construction of the Riverbank Phase
3 active travel routes was completed
during 2025/26.
• Construction of Orbiston Hub Phase
1 was completed during 2025/26.
• Construction of Orbiston Hub Phase
2A is currently underway on
Motherwell Road and Hamilton Road
Page 49 of 110

Page 50

with completion expected during
Summer 2026.
4.6
Ravenscraig Active Travel Links
Subject to securing external funding,
progress Ground Investigation work and
detailed design for the preferred option
identified from the feasibility
study and options appraisal commission,
for a route between the Employment
Access Area and Coursington Road. 
Motherwell Station Active Travel Links
Continue to progress delivery of the
Motherwell Station Active Travel Links
project.
• Progress detailed design of routes
sections between Camp Street and
Airbles Road, Glencairn Street and
Bellshill Road, subject to external
funding.
• Deliver works on route section on
Hope Street/ Muir Street, subject to
external funding.
Ravenscraig Active Travel Links
A consultant has been appointed to
progress Ground Investigation work and
detailed design for the preferred option
for RATL (Motherwell) identified through
the options appraisal commission.  This
will be progressed over 2026/27. 
Motherwell Station Active Travel Links
An options appraisal, concept design and
detailed design commission for Bellshill
Road was awarded, preferred option
identified and design work progressed.
Construction will follow, dependent on the
availability of external funding. 
Due to a notification of funding award
from Transport Scotland being received
too late in the financial year to achieve
delivery by 31 March 2026, delivery of
the work on Hope Street/Muir Street
could not progress. A new bid for funding
has been submitted to Transport
Scotland for 2026/27. 
Green
4.7
Ensure that inclusive
economic growth
remains at the heart of
opportunity to support
affordable and
accessible transport
systems (via the Local
Transport Strategy).
Finalise and seek Committee approval of
North Lanarkshire’s Local Transport
Strategy (LTS). 
The LTS will help prioritise available
investment to ensure communities can
access employment, education and leisure
opportunities, support inclusive economic
The second round of consultation was
undertaken in Winter 2025, with the draft
Local Transport Strategy (LTS) and its
supporting documents updated
accordingly. 
The draft LTS will be presented to
committee in August 2026.
Amber
Page 50 of 110

Page 51

growth and contribute to reducing carbon
emissions.
4.8
Support the delivery of
Electric Vehicle (EV)
charging infrastructure
and other green
transport solutions
across North
Lanarkshire.
Develop and implement a Glasgow City
Region approach to appoint a provider to
increase, manage and maintain public EV
infrastructure.
Full contract specification developed and
Invitation to Tender was issued by
Glasgow City Region in December 2025. 
Tender bids are currently being
evaluated. An update was reported to
Environment and Climate Change
Committee, April 2026.
Green
4.9 Work with the council’s
digital partner to install
and invest in
infrastructure that helps
create one of the best
and most
affordable/accessible
digital provisions in the
UK.
Progress next phase of call off contracts
covering public Wi-Fi and CCTV services. 
Commsworld and partners to continue to
invest in new Fibre to the Home coverage
for residents including Airdrie, Coatbridge,
Motherwell and Shotts.
Approximately 110 sites across North
Lanarkshire now have public Wi-Fi.
Around 30 sites now have CCTV
connectivity via this combined network. 
Through the wider Commsworld
partnership, a couple of partner
organisations have continued their roll
out of residential broadband with more
than 60,000 properties capable of being
served by new service providers who use
the Commsworld backbone for delivery.
Green
4.10
NLC and Commsworld Ltd will continue to
maximise added value via the Framework
Agreement for the provision of digital
connectivity services and associated call-
off contracts, ensuring the delivery of
Community Benefits and additional value
throughout 2025/26.
The initial community benefits associated
with the contract have successful run
their course during the first 3 years. North
Lanarkshire Council will be working with
the supplier to identify new defined
community benefits for the next 3 years.
Green  
Page 51 of 110

Page 52

Appendix 2 
Economic Regeneration Delivery Plan (ERDP)
Performance Framework 
June 2026 
Page 52 of 110

Page 53

Introduction 
Improving economic regeneration plays a significant part in our shared ambition to make North Lanarkshire the place to live, learn, work, invest
and visit. 
The Economic Regeneration Delivery Plan (ERDP) sets out how we will improve economic opportunities and outcomes for everyone in North 
Lanarkshire. This includes delivering new homes, reshaping town centres, attracting investment and jobs. Our investments will benefit everyone
who lives, learns, invests and visits within North Lanarkshire. 
An ERDP Action Plan is updated annually and focuses on our key objectives and day‐to‐day activities in delivering the longer‐term vision set
out within the ERDP and The Plan for North Lanarkshire. 
The ERDP Performance Framework comprises a set of performance indicators at three levels. These indicators aim to collectively provide an 
overview of performance that helps us to understand the impact of our work on improving economic opportunities and outcomes for all. 
Given the shared ambition set out within The Plan for North Lanarkshire, the ERDP Performance Framework is closely aligned to the corporate 
Strategic Performance Framework. 
This framework aims to produce evidence that allows for day‐to‐day activities, and progress made towards improving economic opportunities
and outcomes for all to be regularly monitored, reported, assessed, and scrutinised. 
It will also enable performance issues against the ERDP’s key priorities to be identified and addressed, mitigating the risk of delivery failure. 
The ERDP Performance Framework will be kept under review to ensure arrangements remain effective and aligned to future versions of the
ERDP and The Plan for North Lanarkshire. 
ERDP Performance Framework 
The three levels of performance indicators form an interrelated set, with operational measures supporting improvements to services and
outcomes for North Lanarkshire’s residents and businesses in the short, medium, and long‐term. The three levels are summarised below: 
Level 1: The North Lanarkshire Economic Context 
A suite of ‘state of the nation’ health check indicators which collectively provide the North Lanarkshire economic context. 
These indicators are often at a macro level and out with the sole control of the Council. As such, these indicators do not have targets set
against them, instead they set out the intended direction of travel. This approach is consistent with The Plan for North Lanarkshire Strategic
Page 53 of 110

Page 54

Performance Framework. The ERDP framework uses 5 of the 28 indicators set out in the Strategic Performance Framework to assess the
performance of the North Lanarkshire economy. 
Data comes from national sources such as the Office for National Statistics (ONS) or Scottish Local Authority Economic Development (SLAED) 
Performance Reports. As data is reported in a consistent manner nationally, North Lanarkshire can be benchmarked against Scotland and 
comparator authorities across the Glasgow City Region. 
Level 2: Improving economic opportunities and outcomes for all 
A suite of indicators and information to enable an assessment of progress towards our long‐term vision of improving economic opportunities and 
outcomes for all. 
When measuring outcomes there is often a delay in being able to demonstrate that outcomes have been achieved, or it may not be clear how
much of a change in an outcome can be attributed to NLC’s actions alone, or if external factors have influenced the outcome. Therefore, some
of these indicators do not have targets set against them but will instead be used for benchmarking purposes. 
The group of performance indicators at all three levels in the ERDP Performance Framework therefore aims to collectively demonstrate 
improvements to outcomes in the long‐term, while demonstrating effective use of resources in the short term (the latter through monitoring and 
measuring day to day operations). 
Level 3: Day to day operations 
These performance indicators allow the quality, efficiency, and effectiveness of day‐to‐day operations to be assessed. They include targets in
the short‐term (current financial year), medium‐term, by the end of the current ERDP cycle (2027/28) and longer‐term (2035). 
Targets are cumulative from the baseline onwards (not additional to previous target). For example, the 1,951 Open Market Purchase Scheme 
completions by 2035 includes the 970 completions which have already been achieved by March 2026. 
Relevant teams across Place are identified against each indicator to ensure accountability. The inclusion of input and output measures, and
understanding how these lead to improved outcomes, will be an important factor in determining the success of the Framework and Economic
Regeneration Delivery Plan. 
Page 54 of 110

Page 55

ERDP Performance Framework: Level 1 
The North Lanarkshire Economic Context 
Indicator Baseline Latest
available
update
Measuring this
will tell us if we
have…
What
success
looks like
Intended
direction
of travel
Latest
direction
of travel
North Lanarkshire commentary
Growth in
Gross
Value Added
(GVA) (income
approach) - %
change from
year to year
2015 –
2016 
NL
2.6% 
Scotland
1.1%
2022 –
2023 
NL
12.5% 
Scotland
9.1%
Increased 
North 
Lanarkshire’s 
economic 
output
Continued 
economic 
growth in 
North
Lanarkshire  
The latest data published shows
that GVA growth in North
Lanarkshire remains positive,
suggesting the local economy
continues to grow, and does so at
a greater rate than the national
average. 
The latest data shows an 12.5%
increase in GVA per head in NL
from 2022 to 2023, which is an
improving trend following year on
year growth of 7% recorded in the
previous year.
Gross weekly
pay (residents)
– full time
employees
2018 
NL
£545.70 
Scotland
£562.70
2025 
NL
£775.10 
Scotland
£775.60
Increased 
the earnings 
of people 
who live in 
North
Lanarkshire
Earnings for 
people who 
live in North 
Lanarkshire 
continue to 
grow on a
par with
national
levels 
Gross weekly pay for NLs
residents became higher than the
average earnings for Scotland for
the first time ever in 2022. Results
each year show gross weekly pay
has continued to increase
positively year on year since.
Page 55 of 110

Page 56

Indicator Baseline Latest
available
update
Measuring this
will tell us if we
have…
What
success
looks like
Intended
direction
of travel
Latest
direction
of travel
North Lanarkshire commentary
% of all
economically
active (16‐64 
years)
Oct
2017/Sept
2018 
NL
77.9% 
Scotland
77.6%
Oct
2024/Sept
2025 
NL
77.1% 
Scotland
77.3%
Increased 
the number 
of North 
Lanarkshire’s 
residents in 
employment
More people 
aged 16 to
64 living in
NL are
economically 
active and 
contributing 
to the local / 
national 
economy  
In 2020, this indicator started to
show a decline and remained
unsteady before reaching it’s
lowest point to date at September
2022 (66.8%), due to impacts of
the pandemic. Since then, gains
have been recorded, with the
most recent data showing an
increase from 70.5% in March
2024 to 77.1% in September
2025. 
In North Lanarkshire, this equates
to around 173,600 people
economically active with figures
almost returning to the 2019 pre-
pandemic level (174,000).
% of
VAT/PAYE
registered
businesses
that survive for
at least three
years
2013-
2016 
NL
58.7% 
Scotland
62.1%
2021 -
2024 
NL
53.4% 
Scotland
57.6%
Increased and
sustained new
businesses in
North
Lanarkshire
More locally 
generated 
and incoming 
businesses 
being
created, 
surviving,
and
sustaining in 
the longer-
term  
3-year survival rates for
businesses in North Lanarkshire
shows a varying position over the
years, with the latest results for
2024 (published in November
2025) showing that 53.4% of
businesses registered in 2021
have survived for 3 years. 
The latest results for North
Lanarkshire (53.4%) are higher
than the previous year (51.5%). 
Page 56 of 110

Page 57

Indicator Baseline Latest
available
update
Measuring this
will tell us if we
have…
What
success
looks like
Intended
direction
of travel
Latest
direction
of travel
North Lanarkshire commentary
% of working
age people
(16-64)
claiming one or
more key
benefits
Dec 2018 
NL
3.5% 
Scotland
2.7%
Dec 2025 
NL
2.8% 
Scotland
2.9%
Reduced the 
number of
residents reliant
on employment 
related benefits
All of North 
Lanarkshire’s 
residents 
capable of 
working are
sustaining 
employment  
The latest claimant count rate for
NL (3.2%) is now lower than The
Plan for North Lanarkshire
baseline of 3.5%, with the number
of people now claiming one or
more of the key benefits is 7,070
compared to the  baseline of
7,675. 
ERDP Performance Framework Level 2: 
Improving economic opportunities and outcomes for all 
Key
performance
indicator
What does this tell us? Baseline By 31 March
2025
Short-term
(By 31 March 2026)
Medium-term 
By next ERDP
Review
(31 March 2028)
Long-term
(By 31
March 2035)
Actual  Target Actual Target Target
Estimated
number of
construction
jobs (PYEs)
created
The number of gross construction
jobs (PYEs) created as a result of
ERDP related investment by NLC
and our ALEOs across North
Lanarkshire. 
Construction jobs created as a
result of physical regeneration
projects occur during the
construction phase of the project
only and do not recur once the
development is operational. 
796 3,153 3,672 3,681 4,884 7,883
Page 57 of 110

Page 58

Key
performance
indicator
What does this tell us? Baseline By 31 March
2025
Short-term
(By 31 March 2026)
Medium-term 
By next ERDP
Review
(31 March 2028)
Long-term
(By 31
March 2035)
Actual  Target Actual Target Target
Therefore, these figures are 
reported as Person Year 
Equivalents (PYEs) rather than
Full‐time Equivalents (FTEs). 
Estimated
number of
gross full‐time
equivalents
(FTEs) created
The estimated number of gross
jobs (FTEs) created as a result of
ERDP related investment by NLC
and our ALEOs across North
Lanarkshire. 
The gross number of jobs created
does not take account of factors
such as displacement. This
measures the follow on impact
generated once the physical works
have been completed and the new 
infrastructure is being put to
economic use. 
As these outcomes only occur once projects are operational, there
will be a delay in demonstrating this outcome has been achieved. 
Therefore, this indicator has a long‐term target to 2035 only. 
Note: This jobs figure is based on investment across North
Lanarkshire Council’s New Supply Programme, City Deal
Programme, and the Regenerating Cumbernauld project. Fusion
Assets investments are also included.
13,568
Estimated 
number of net 
additional full-
time equivalents 
(FTE) created
The estimated number of net jobs
(FTEs) created as a result of
ERDP related investment by NLC
and our ALEOs across North
Lanarkshire. 
Under this measure, the gross
number of jobs created is adjusted
to better assess the true extent of
As these outcomes only occur once projects are operational, there
will be a delay in demonstrating this outcome has been achieved. 
Therefore, this indicator has a long‐term target to 2035 only 
Note: This jobs figure is based on investment across North
Lanarkshire Council’s New Supply Programme, City Deal
Programme, and the Regenerating Cumbernauld project. Fusion
Assets investments are also included.
7,098
Page 58 of 110

Page 59

Key
performance
indicator
What does this tell us? Baseline By 31 March
2025
Short-term
(By 31 March 2026)
Medium-term 
By next ERDP
Review
(31 March 2028)
Long-term
(By 31
March 2035)
Actual  Target Actual Target Target
the likely impact of the ERDP on
the local labour market and
economy. 
This measures the follow‐on 
impact generated once the 
physical works have been 
completed and the new 
infrastructure is being put to
economic use. 
Town centre
vacancy rates
‐ % of vacant
Commercial
units as a % of
total units across
North
Lanarkshire’s
town centres.
This indicator measures the 
level of vacant units within 
town centres. 
The ERDP aims to create vibrant
mixed‐use towns where people
live, work, shop, eat, and access
local services. 
As such, recognition needs to be
given to the fact that vacancies
may temporarily increase where
vacant possession of redundant
retail centres or land assembly is
required to enable transformative
change.
18.9% 
Year:
2018/19
This measure will be used for benchmarking purposes only and therefore
no targets have been set. 
2024/25 ‐ Latest published data shows that North
Lanarkshire’s town centre vacancy rate was 17.7%, above the
Scottish average of 11.5%. However, North Lanarkshire’s town centre
vacancy rate has fallen slightly from the 2018/19 baseline of 18.9%. 
Reshaping our town centres to ensure they provide modern and
attractive centres that meet the needs of our communities remains a key
ERDP priority and the 2025/26 ERDP Action Plan performance report
outlines key steps taken over the last 12 months to redevelop our town
centres. 
Town Action Plans are in place for 6 of North Lanarkshire’s towns and
will be revised during 2026/27, including the development of a seventh
TAP, to include Coatbridge. Cumbernauld town centre is undergoing
significant regeneration, and a Masterplan process will commence during
2027 specifically for Cumbernauld.
Page 59 of 110

Page 60

Key
performance
indicator
What does this tell us? Baseline By 31 March
2025
Short-term
(By 31 March 2026)
Medium-term 
By next ERDP
Review
(31 March 2028)
Long-term
(By 31
March 2035)
Actual  Target Actual Target Target
% of marketable
employment 
land
The purpose of this measure is 
to contribute to the assessment of
how ‘investor ready’ North
Lanarkshire is in terms of providing
the necessary infrastructure for
new and growing businesses,
including inward investment. 
Employment land includes 
any land that is allocated for
employment use in the Local
Development Plan, or land that
has valid planning consent.  
Marketable land is defined as land 
that meets business requirements
and has secure planning status, is
serviced or serviceable within five
years, and is accessible by
walking, cycling and public 
transport. 
65.7% 
Year:
2017/18
This measure will be used for benchmarking purposes only and therefore
no targets have been set. 
2024/25 ‐ Latest published data shows that 68.0% of North Lanarkshire’s 
employment land was deemed to be ‘marketable land’. This is higher
than the Scottish average of 56.3%. 
The 2024/25 NL figure is slightly lower than the previous year (2023/24)
which was 71.0%. 
Given levels of developable land available, the council is currently
developing a Business & Industry Strategy for North Lanarkshire which
will aim to identify how council investment in such land should be
prioritised.
Commercial
Planning
applications‐
average time
(weeks) to
process
business and
Planning applications are 
important in terms of the future
development and use of land
across our towns and
communities. 
An efficient and well‐functioning
planning service plays an
6.9
weeks 
Year:
2017/18
This measure will be used for benchmarking purposes only and therefore
no targets have been set. 
2024/25 – North Lanarkshire 7.2 weeks, compared to a Scottish
average of 11.0 weeks
The North Lanarkshire processing time has reduced from 13.5 weeks
(2020/21) and 12.6 weeks (2021/22) during the pandemic and is now
below pre pandemic levels (9.1 weeks in 2019/20). However, application
Page 60 of 110

Page 61

Key
performance
indicator
What does this tell us? Baseline By 31 March
2025
Short-term
(By 31 March 2026)
Medium-term 
By next ERDP
Review
(31 March 2028)
Long-term
(By 31
March 2035)
Actual  Target Actual Target Target
Industry
planning
applications
important role in facilitating
sustainable economic growth and 
delivering high quality
development in the right places. 
This indicator shows how long 
the council takes to deliver
commercial planning application
decisions (i.e. for business and
industry). 
process timing remains higher than the 2017/18 baseline of 6.9 weeks.
The baseline year was a historic low and somewhat of an outlier
compared to other available data. 
Page 61 of 110

Page 62

Percentage of
premises able to
access
Superfast
Broadband
Digital infrastructure is one of 
the key gateways to achieving 
inclusive growth and prosperity. By
improving our digital infrastructure,
we will connect North Lanarkshire
to markets and opportunities.
NLC has a role alongside telecoms
companies in facilitating and
enabling the development of
effective digital infrastructure. 
The required digital infrastructure
speed needed to have superfast
broadband is 30Mbit/s. 
97.0% 
Year:
2017/18
This measure will be used for benchmarking purposes only. 
2024/25 – North Lanarkshire – 99.4% / Scotland 97.1% 
North Lanarkshire has a higher % of premises able to access superfast 
broadband compared to the Scottish average.
Carbon Dioxide 
(CO2) emissions
area wide per
capita (tonnes)
Sustainability is one of the key
principles which underpins the
ERDP. 
These estimates can assist us 
in understanding our
environmental impact and can 
be used to inform our actions 
against climate change and 
towards North Lanarkshire’s 
target of achieving net zero 
emissions by 2030.
5.92t per 
capita 
Year: 
2014
This measure will be used for benchmarking purposes only. 
2023 – North Lanarkshire 5.30t CO2 / Scotland 6.90t CO2 
North Lanarkshire’s CO2 emissions is lower than the Scottish average
on a per head basis. North Lanarkshire’s emissions data has been fairly
steady over the last 3 years and are below the baseline year of 2014. 
Emissions were at their lowest in 2020 (4.70t CO2) which was during the
lockdown period of the pandemic, which likely resulted in reduced
emissions from less traffic on roads and some industries reducing their
operations. 
Page 62 of 110

Page 63

ERDP Performance Framework: Level 3 
Day to day operations 
Priority 1: Developing housing that promotes improved quality of life and creates a better place to live 
Why is this set of indicators of interest? The Plan for North Lanarkshire ambition
statement alignment
This reflects the council’s commitment (through the Local Housing Strategy and Transforming
Places Programme of Work) to promote a supply of good quality affordable housing across all
tenures. 
This also supports the Strategic Housing Investment Plan (SHIP) which helps deliver Local
Housing Strategy priorities and maximise resources in the Affordable Housing Supply
Programme. 
The target to deliver 6,000 new homes by 2035, includes over 1,900 homes to be acquired
through the open market purchase scheme (an extension of the empty homes purchase
scheme).
1. Ensure a housing mix that supports
social inclusion and economic growth. 
2. Refocus our town centres and
communities to be multifunctional
connected places which maximise social,
economic, and environmental
opportunities. 
Page 63 of 110

Page 64

Key
performance
indicator
What does this tell
us?
Baseline Note: these figures are cumulative and not additional to each other Lead
Team(s) By
2024/25
Short-term Medium-
term
Long-term
2025/26 2026/27 By next
ERDP
Review
(2027/28)
2034/35
Actual Target Actual Target Target Target
Number of
new build
Council
house
completions
The number
of new build council
house completions
via the council’s
New Supply
Programme
633 
Years: 
2010/11
–
2018/19
1,629 1,672 1,630 
Amber
1,850 2,200 4,049 New
Supply
Number of
Open Market
Purchase
Scheme
completions
The number of
homes brought into
Council ownership,
Including some
homes previously
sold under the Right
to Buy
133 
Years:
2010/11
–
2018/19
845 973 970 
Amber
1,080 1,190 1,951 New
Supply
Household
connectivity
capacity
The % of new build
homes (via the New
Supply Programme)
with high quality
digital infrastructure
79% 
Years:
2010/11
–
2018/19
92% 92% 92% 
Green
92% 93% 98% New
Supply 
Page 64 of 110

Page 65

ERDP Priority 1 Performance Summary: 
Total number of indicators Number of indicators with
‘Green’ status
Number of indicators with
‘Amber’ status
Number of indicators with
‘Red’ status
3 1 2 0
Success to date The New Supply Programme was introduced in 2010/11 and NLC has set an ambitious target of
delivering 5,000 council homes by 2035. In February 2025, Housing Committee agreed to increase this
target to 6,000 homes by 2035. 
This will be achieved via a combination of new build, purchasing from the private sector (off the shelf) and
buying existing homes via the Open Market / Empty Homes Purchase Schemes:
• 2,600 homes have been delivered via the New Supply Programme, at 31 March 2026.This
includes 970 homes acquired via the Open Market and Empty Homes Purchase Schemes.
• NLC’s first low carbon (net zero) homes were completed at Dykehead Road, Airdrie in 2022/23.
These homes feature air source heat pump heating systems, battery storage and enhanced
photovoltaic panels. In 2024/25, new homes featuring ground source heat pump heating systems
were completed at Brandon Street, Motherwell.
• All NLC new build developments with building warrant submissions from April 2024 will include
non-gas, zero emission heating systems as standard. This approach supports our strategy of
delivering energy efficient and sustainable housing across North Lanarkshire. 
• The New Supply Programme continues to maximise community benefits through which forms part
of the procurement and contract evaluation process for new developments. Contractors support
employability, training and work experience opportunities for local people, helping young people
progress towards positive destinations within the construction sector.
• In 2023/24, a new amenity house opened in Castlehill Road, Wishaw for local residents to enjoy,
meet and socialise together. This is just one of the community benefits delivered as part of our
New Supply Programme.
• During 2025/26 alone, construction contractors were engaged to provide opportunities that
support young people towards positive destinations within the construction industry.  This included
14 x Full Time posts such as Trainee estimators, Apprentice Plumbers and Electrician, Trainee
Site Manager, Off Site Manufacturing and Assembly Operator. 17 work experience placements for
14 - 16yrs of age were also provided as well as 19 careers events to encourage young people to
consider careers in construction.  
Page 65 of 110

Page 66

Challenges Various external factors such as inflationary pressures across the UK economy and the wider
international geopolitical environment have impacted construction and materials costs. 
Despite these challenges, the programme is progressing well, with a further around 375 homes currently
under construction across 7 sites. 
Priority 2: Reshaping our town centres to ensure that they provide modern and attractive centres that meet the needs of our
communities 
Why is this set of indicators of interest? The Plan for North Lanarkshire ambition
statement alignment
A key priority within the Transforming Places Programme of Work Delivery Plan is the
regeneration of North Lanarkshire’s town centres and their redevelopment as modern, high‐
quality, mixed‐use spaces with a much stronger focus on residential provision.
1. Ensure a housing mix that supports
social inclusion and economic growth. 
2. Refocus our town centres and
communities to be multifunctional
connected places which maximise social,
economic, and environmental
opportunities. 
Page 66 of 110

Page 67

Key
performance
indicator
What does this tell
us?
Baseline Note: these figures are cumulative and not additional to each other Lead
Team(s) By
2024/25
Short-term Medium-
term
Long-
term
2025/26 2026/27 By next
ERDP
Review
(2027/28)
2034/35
Actual Target Actual Target Target Target
Investment
made in town
centre
developments
The amount (£)
invested in North
Lanarkshire’s town
centres to enable
sites to be
repurposed or
redeveloped.
This includes
NLC investment
and external funding
sources.
£29.8m 
Years:
2010/11
–
2018/19
£119.7m £133.8m £132.0m 
Amber
£165.7m £193.0m  £375.6m  City Deal &
Regeneration
/ New Supply
External
funding
secured for
town centre
regeneration
projects
The amount (£) of
external funding 
secured for town
centre regeneration 
projects in North
Lanarkshire’s town
centres
£9.26m 
Years:
2010/11
–
2018/19
£56.6m £62.2m £61.9m 
Amber 
£76.8m £91.7m £184.8m City Deal &
Regeneration
/ New Supply
Number of
town centre
buildings
and/or sites
repurposed or
redeveloped
The number of
existing buildings or
vacant sites within
North Lanarkshire’s
town centres, which
have been
repurposed 
or redeveloped.
34 
Years:
2010/11
–
2018/19
63 67 66 
Amber
71 78 95 City Deal &
Regeneration
/ New Supply
/ RSL’s
Page 67 of 110

Page 68

Key
performance
indicator
What does this tell
us?
Baseline Note: these figures are cumulative and not additional to each other Lead
Team(s) By
2024/25
Short-term Medium-
term
Long-
term
2025/26 2026/27 By next
ERDP
Review
(2027/28)
2034/35
Actual Target Actual Target Target Target
Number of
new
affordable
homes
completed
within town
centres (or
edge of town) 
The number of units 
either converted to
residential or new
build house
completions by NLC
or RSLs within 
town centres
883 
Years:
2010/11
–
2018/19
1,771 1,850 1,848 
Amber
2,020 2,485 2,662 New Supply /
RSL’s 
ERDP Priority 2 Performance Summary: 
Total number of indicators Number of indicators with
‘Green’ status
Number of indicators with
‘Amber’ status
Number of indicators with
‘Red’ status
4 0 4 0
Success to date Since the ERDP was introduced in 2019, eight town visions have been developed for Airdrie, Bellshill,
Coatbridge, Cumbernauld, Kilsyth, Motherwell, Shotts and Wishaw. 
Town Action Plans have been developed for Airdrie, Bellshill, Kilsyth, Motherwell, Shotts and Wishaw,
outlining the short, medium and long‐term actions required to realise the visions for each of these towns. 
A Neighbourhood Board has been established in Coatbridge. The board will drive the delivery of the
Regeneration Plan for Coatbridge, aligned to the Town Vision. Up to £19.5 million has been allocated to
Coatbridge and will be drawn down over the next 10 years. 
Page 68 of 110

Page 69

The council acquired The Centre Cumbernauld in June 2023, a major milestone in the redevelopment of
Cumbernauld town centre. Proposals are now being developed for the phased redevelopment of the town
centre. 
Fleming House was demolished during in 2025, marking another major milestone in the redevelopment of
the town. 
£132 million has been invested in towns since the launch of the ERDP in 2019, with key projects
including:
• The acquisition of key town centre properties, with plans to convert to residential developments. This
includes Motherwell Old Town Hall, Bank Street and Main Street (Coatbridge), the former Kings
House (Wishaw) and the former Methodist Church (Wishaw).
• Following the acquisition of the former YMCA building (Brandon Street, Motherwell), this property has
now been converted to 6 new flatted units for social rent and a further 42 new build units were
developed on an adjacent parcel of vacant land. Residents are now enjoying the benefits of these
new council homes.  
• Enabling the regeneration of the former Orrs building in Airdrie, which completed in 2024
• The acquisition of The Centre Cumbernauld in June 2023, unlocking the major regeneration of
Cumbernauld town centre.
• Major improvements to community facilities such as Motherwell Library.
• A 2.3km Green Route, connecting Cumbernauld town centre with surrounding communities such as
Kildrum and Carbrain.
• 1,848 town centre homes have been delivered via NLC and Registered Social Landlords (RSLs) as
part of the Strategic Housing Investment Plan (SHIP). This includes homes within a 10‐minute walk of
town centres, in line with the 20‐minute neighbourhood definition.
Challenges Various external factors such as inflationary pressures across the UK economy and the wider
international geopolitical environment have impacted construction and materials costs. 
Challenging public finances over the last few years have also put a recent strain on the availability of
external government funding towards capital projects. 
Despite this, progress continues towards reshaping and repopulating our town centres. The council
continues to engage with property and landowners to acquire buildings/land which are strategically
aligned with our redevelopment plans. However, a key challenge is managing owner’s expectations
around property/land value, ensuring best value is achieved.
Page 69 of 110

Page 70

Priority 3: Improve our business and industrial infrastructure, creating opportunity for investment and for companies to start-up or
relocate here 
Why is this set of indicators of interest? The Plan for North Lanarkshire ambition statement
alignment
Although North Lanarkshire has a significant amount of industrial land and
premises, some are not suitable for today’s needs. To enable our people and
businesses to thrive we’ll invest in business and industrial space and in
marketing North Lanarkshire as the place to invest and work.
2. Refocus our town centres and communities to be
multifunctional connected places which maximise social,
economic, and environmental opportunities. 
3. Maximise the use of our marketable land and assets
through improved development in business and industrial 
infrastructure. 
16. Transform our natural environment to 
support wellbeing and inward investment 
and enhance it for current and future 
generations 
Page 70 of 110

Page 71

Key
performance
indicator
What does this
tell us?
Baseline Note: these figures are cumulative and not additional to each other Lead
Team(s) By
2024/25
Short-term Medium-
term
Long-
term
2025/26 2026/27 By next
ERDP
Review
(2027/28)
2034/35
Actual Target Actual Target Target Target
Investment
made
towards the
development
of 
business and 
industrial
infrastructure
The amount 
(£) invested in 
business and
industry zoned
land or upgraded
to existing 
business and
industrial
infrastructure
across North
Lanarkshire.
This includes NLC
and ALEO funding 
only. 
£0.524m 
Year: 
2018/19
£8.25m £9.25m £9.60m 
Green
£10.60m  £12.60m £18.15m Fusion
Assets / NLP
/ City Deal &
Regeneration
External/
private
sector/loan
funding
secured for 
office and 
industrial
development
The amount (£) of
external, private or
loan funding
secured for
investment in
office and
industrial
developments
across North
Lanarkshire.
£1.3m 
Year: 
2018/19
£40.41m £46.30m £46.19m 
Amber
£52.07m £59.57m £67.17m Fusion
Assets / City
Deal &
Regeneration  
Page 71 of 110

Page 72

Ha of land
improved for
business and
industrial use
The amount (Ha)
of land remediated
or improved for
business and
industry use
across North
Lanarkshire
3.61ha 
Year: 
2018/19
12.47ha 12.47ha 12.47ha 
Green
12.47ha 14.18ha 16.21ha Fusion
Assets / City
Deal &
Regeneration
Sq.ft of 
commercial
workspace
created or
refurbished
The amount
(square footage) of
Commercial
workspace created
or refurbished 
as a result of
investment by
NLC, Fusion
Assets or North
Lanarkshire
Properties across
North Lanarkshire
18,000
sq.ft 
Year:
2018/19
169,733
sq.ft
221,000
sq.ft
198,960
sq.ft 
Amber
228,960
sq.ft
328,358
sq.ft
412,358
sq.ft
Fusion
Assets / City
Deal &
Regeneration 
Page 72 of 110

Page 73

ERDP Priority 3 Performance Summary: 
Total number of
indicators
Number of indicators with ‘Green’
status
Number of indicators with
‘Amber’ status
Number of indicators with
‘Red’ status
4 2 2 0
Success to date Since the introduction of the ERDP in 2019, an additional 198,960 sq.ft of commercial workspace has been
created, including 40,500 sq.ft at Gartcosh Industrial Park (buildings 2 and 3). 
During 2023/24, Fusion Assets acquired Plot One at the former Ravenscraig steelworks site in Motherwell.
Following the remediation and servicing of the 6.4 acre development site, Fusion Assets are currently on site
with the first phase of development of a multi let industrial scheme. Phase 1 consists of six units totalling 29,210
sq.ft which is scheduled for completion in October 2026. 
Fusion Assets completed the construction of a new 15,500 sq.ft, net zero carbon enabled, industrial building at
Link Park, Newhouse during 2023/24, which was immediately let for a new Scottish depot for a multinational
company 
Construction on the third and final building at Link Park, Newhouse completed during 2025/26, delivering an
additional 19,375 sq.ft of new industrial workspace. 
Enabling works were completed in June 2023 at Gartcosh Industrial Park (Phase 3). This site has planning
approval for the construction of up to four new industrial units, totalling 62,000 sq.ft. 
11,410 sq.ft has been developed at Spruce Court within Orbiston Street Industrial Estate, Motherwell. This has
provided new start‐up units for SMEs as well as a unit for New College Lanarkshire students as part of an
initiative to support young entrepreneurs who are setting up a business within the area. This project was part
funded by the Scottish Government’s Regeneration Capital Grant Fund (RCGF), following a successful bid
(£1.74m). 
The council has also secured £1.9m RCGF which contributed to the significant redevelopment of Braidhurst
Industrial Estate in Motherwell. This project upgraded and modernised six existing units owned by North
Lanarkshire Properties as well as the construction of 10 industrial units suited to local small‐medium sized
enterprises (SMEs). 
Page 73 of 110

Page 74

£11.28m has been secured for Fusion Assets led projects, via the Glasgow City Region City Deal Enabling
Commercial Spaces Programme. This will support the delivery of Ravenscraig Phase 1 (2 buildings totalling
29,210 sq.ft), Ravenscraig Phase 2 (2 buildings totalling 32,930 sq.ft) and Westfield Point, Cumbernauld Phase
1 (2 commercial units totalling an estimated 21,439 sq.ft).   
Lastly, the council continue to receive ring‐fenced Vacant and Derelict Land Fund (VDLF) funding from the
Scottish Government (subject to the submission and approval of an annual VDLF Local Delivery Plan) and
continue to focus this investment towards the creation of new industrial and business space and ultimately new
jobs.
Challenges Various external factors such as inflationary pressures across the UK economy and the wider international
geopolitical environment have impacted construction and materials costs. 
Increased construction costs, coupled with high interest rates for loan finance and lower investment yields have
also impacted on the viability of externally funded projects which Fusion Assets looks to deliver, either solely or
as a joint venture. 
This has caused some delays to projects and investments made. Despite these challenges, good progress has
been made against improving our business and industrial infrastructure, as demonstrated in the “success to
date” section above. 
Braidhurst Industrial Estate was chosen as a demonstrator project for improvements to our local light-industrial
stock. This pilot project has experienced significant cost overruns due to rising material costs and inflation as
well as abnormal costs due to the condition of the aging NLP units, which required significant works to upgrade
electrics and to improve the energy efficiency of the units. These works, as well as significant wait times getting
the utility companies onsite, have caused severe delays to programme which also substantially increasing costs
to the project. However, once operational, the project is anticipated to deliver significant benefits to the local
economy, supporting employment, business start-ups and expansion of local enterprises. 
Page 74 of 110

Page 75

Priority 4: Continuing to improve our connectivity and develop new opportunities to transform our road, rail and digital infrastructure 
Why is this set of indicators of interest? The Plan for North Lanarkshire ambition
statement alignment
Another key priority within the Transforming Places Programme of Work is the delivery of
the City Deal Infrastructure programme which aims to increase Gross Value Added
across the entire Glasgow City Region by providing increased access to jobs through
improved connectivity to centres of employment and opening up development
opportunity. 
We will connect North Lanarkshire to markets and opportunities by improving our strategic
infrastructure.
2. Refocus our town centres and communities to
be multifunctional connected places which
maximise social, economic, and environmental
opportunities. 
4. Market and promote North Lanarkshire as the
place to live, learn, work, invest, and visit. 
5. Grow and improve the sustainability and
diversity of North Lanarkshire’s economy 
16. Transform our natural environment to 
support wellbeing and inward investment 
and enhance it for current and future generations
Key
performance
indicator
What does this
tell us?
Baseline Note: these figures are cumulative and not additional to each other Lead Team(s)
By
2024/25
Short-term Medium-
term
Long-
term
2025/26 2026/27 By next
ERDP
Review
(2027/28)
2034/35
Actual Target Actual Target Target Target
Investment 
made in key 
infrastructure 
projects 
(including 
City Deal 
projects) to 
date
The amount (£)
invested in key
infrastructure
projects (including
investment made
in City Deal
projects to date).
This includes NLC
direct investment
£6.8m 
Years: 
2015/16
–
2018/19
£56.5m £69.89m £63.65m 
Red
£70.75m £112.86m £277.58m City Deal &
Regeneration
Page 75 of 110

Page 76

and Glasgow City
Region City Deal
funding. 
This excludes
Enabling
Commercial
Spaces funding
which is captured
under Priority 3:
Business and
Industry 
Number of 
key
infrastructure
contracts
completed
The number 
of key Enterprise
Projects or City
Deal infrastructure
Contracts
completed.
A long‐term
project can contain 
Multiple contracts
3  
Years: 
2015/16
–
2018/19
16 21 18 
Amber
25 29 33 City Deal &
Regeneration
Km of active 
travel routes
The amount (Km)
of active travel
routes created
which will improve
the ability of all
people to walk,
wheel and cycle
throughout North
Lanarkshire. This
will help reduce
Inequalities by
providing people
with more 
0km 
Year:
2018/19
19.85km 21.8km 22.7km 
Green
28.0km 50km 125km Infrastructure
&
Transportation
Page 76 of 110

Page 77

Opportunities 
to access
employment, 
local services, 
education or 
training. 
ERDP Priority 4 Performance Summary: 
Total number of indicators Number of indicators with
‘Green’ status
Number of indicators with
‘Amber’ status
Number of indicators with
‘Red’ status
3 1 1 1
Success to date The following headline successes has been achieved since the commencement of the council’s City Deal
Infrastructure Investment Programme:
• £63.6m City Deal Programme investment to March 2026 (project development and delivery)
• 18 infrastructure contracts delivered (City Deal contracts and other infrastructure contracts to support
core City Deal projects). 
Gartcosh/Glenboig Community Growth Area (CGA):
• Gartcosh Business Park to Glenboig Link Road project delivered (comprising three works contracts).
• Benefits realisation has commenced as a result of the Glenboig Link Road project with housing
developments at Gartcosh/Glenboig CGA and Fusion Assets investment in commercial/industrial units
at Gartcosh Business Park. There has also been evidence of market interest (both residential and
commercial) in the area. 
Motherwell Town Centre Transport Interchange: 
• Motherwell Station Park and Ride expansion project delivered.
• Muir Street Interchange works completed in May 2023. 
Ravenscraig Infrastructure Access (RIA) South:
• West Coast Mainline Crossing guided into place under a closure of the rail line in April 2023. 
• Demolition works completed to former business properties at Manse Road and Windmillhill Street during
2024/25.
Page 77 of 110

Page 78

East Airdrie Link Road (EALR)
• Outline Business Case approved August 2024. 
• In June 2025, Policy and Strategy committee approved the inclusion of the Towers Road Link within the
scope of the proposed East Airdrie Link Road project.
• Section one planning application for EALR submitted 
A8/M8 Corridor Access Improvements: 
• Options appraisal and concept design work progressed for Phase 1 and 2 of Eurocentral Strategic
Active Travel Links project. 
• Consultants have now been appointed to prepare detailed designs, which is progressing well. 
Active Travel
• Motherwell Station Active Travel Links Phase 1 (West Hamilton Street to Motherwell Civic Centre; Hope
Street, Muir Street and Pollock Street) works completed on West Hamilton Street and from Asda to
Camp Street at the Civic Centre.
• Ravenscraig Active Travel Link Phase 2 works completed; feasibility study and options appraisal
commission progressed for active travel links between Courington Road, Motherwell and Ravenscraig
Regional Sports Facility with final outcome of the study due Summer 2025.
• Alexander Street, Wishaw, Active Travel and Road Safety Improvements: construction completed.
• Meadowhead, Wishaw, Active Travel and Road Safety Improvements: construction completed.
• Glasgow Road, Wishaw, Active Travel and Road Safety Improvements: detailed design finalised and
Phase 1 constructed.
• Carnbroe Community Hub, Active Travel Links: detailed designs finalised and construction completed. 
Challenges Over the last 4 years in particular, a variety of external factors and challenges have affected construction
and infrastructure activity which have impacted on project programmes and milestones: 
Various external factors such as the Covid‐19 pandemic, Brexit, the wider geopolitical environment and
rising inflation across the UK economy have impacted construction and materials costs. Labour market and
material supply issues have continued to impact on tender costs and put pressure on delivery timescales. 
Ravenscraig Infrastructure Access South – due to identified drainage design issues within the
Motherwell to Ravenscraig works tender package.  A revised procurement strategy for development of the
new road between Windmillhill Street and the Ravenscraig Regional Sports Facility is now being taken
Page 78 of 110

Page 79

forward as a series of smaller, related work phases. Spend profiles for future years will be based on this
revised strategy. 
Advance demolition works at the former Evans Halshaw garage, former Cook and Indiis and YESS
electrical site have taken place, to prepare the land for construction of the new road. A Value Engineering
review commission was awarded and is now complete. This will inform the revised detailed design taking
place over 2026. 
East Airdrie Link Road – the consultancy commission for preliminary design and statutory approval
services for the East Airdrie Link Road has progressed well, with an updated alignment for the link road
prepared and Environmental Impact Assessment work underway. Preparations were made for public
consultation and submission of a PAN notice to the Planning Service.  A planning application for section one
was submitted in January 2026.  A second application will be submitted in June 2026 for full scheme.
Dialogue with NHS Lanarkshire on project interfaces with the Monklands Replacement Hospital Project has
also progressed. 
Active Travel infrastructure – the council is continuing to progress strategic Active travel projects in 
accordance with the priorities identified in its Active Travel Strategy, including improving active travel 
connections to new Community Hubs. However, progress with delivering new/improved routes is largely 
dependent on availability of external funding with allocations generally made on an annual basis which 
makes forward planning more challenging. 
Page 79 of 110

Page 80

Page 80 of 110

Page 81

North Lanarkshire Council
Report
Enterprise & Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref     PH/JG Date 21/08/26 
Business Gateway Lanarkshire - Performance Report 2025/26 
From  Pamela Humphries, Chief Officer (Place)  
E-mail Jaz GharraMcBeth, gharramcbethj@northlan.gov.uk 
Executive Summary 
This report provides an update to Committee on the activities and performance of the
Business Gateway Lanarkshire service from 1 April 2025 to 31st March 2026. 
During the period, North Lanarkshire Council continued to act as accountable body,
responsible for the management and delivery of the Business Gateway Lanarkshire service
which operates across the North and South Lanarkshire council areas. Service governance
was maintained through regular meetings comprising North and South Lanarkshire
Councils and Business Gateway Lanarkshire management. 
Recommendations
It is recommended that the Enterprise and Fair Work Committee: 
1) Acknowledge the performance of the service during 2025/6
2) Endorse improvements to service delivery for 2026/7 as set out in section 2.20 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (5) Grow and improve the sustainability and diversity of North
Lanarkshire's economy
Programme of Work Brighter Futures
Item 5
Page 81 of 110

Page 82

1. Background 
1.1 Business Gateway is a national service which is delivered by individual Local
Authorities to provide free, impartial advice and support to pre-start, new start and
existing businesses.
1.2 Business Gateway has the following core service objectives: 
• Support more people with their ambitions to start a business.
• Support more businesses to survive and achieve their growth ambitions.
• Support more people with their aspirations for high business growth.
• Support more people from underrepresented groups to access mainstream
business support. 
1.3 Underpinning the service objectives there is commitment to provide support 
across several themes. These include Carbon Reduction, Fair Work, Innovation, 
Internationalisation, Digital Upskilling, Community Wealth Building and Job Creation.
In addition, Local Authorities have the flexibility to tailor services to address specific
local needs and priorities. 
1.4 In addition to national objectives, the following local priorities and objectives were
agreed for 2025/26 to align to the plans for both North and South Lanarkshire Councils: 
• Increase the reach of Lanarkshire Business Gateway across all communities
including a renewed focus and take-up of services from residents from rural
communities and priority SIMD areas 
• Increase take-up of Lanarkshire Business Gateway services from under-
represented groups including long-term unemployed, economically inactive
residents, carers, young people, BAME, disabled people, restorative justice/ex-
offenders 
• Increase focus and take-up of Lanarkshire Business Gateway services from Social
Enterprises, employee-owned businesses and co-operatives 
• Inspire and increase engagement and take-up of services by young people
focussing on enterprise pathways in schools, college (New College
Lanarkshire/South Lanarkshire College), UWS, youth groups 
• Working alongside the Economic Development providing Business Gateway
services to key sectors including construction, food and drink, creative industries,
energy, manufacturing/engineering services, tourism and transport & logistics 
• Delivery of support to town centre businesses to support North Lanarkshire/South
Lanarkshire town centre action plans 
• Increase engagement with non-engaged business and those who require additional
support to survive 
2.  Report   
2.1   Enquiries 
Clients typically access the Business Gateway service through making an initial 
enquiry through a number of different channels including: 
• the BG website (Planning to Start Review and Strengthen Your Business
Review)  
Page 82 of 110

Page 83

• the Enquiry Fulfilment & Research Service (EFRS) – Telephone, E-mail and
Social Media and 3) 
• through Local Contact – Telephone, E-mail, Social Media, Client and Partner
Referral. 
Typically, Business Gateway Lanarkshire receives 3,000 enquiries per year, of which
2,000 relate to Pre-Start/New Start businesses with the balance of 1,000 being from
established businesses. 
2.2   2025/26 Enquiries 
Service Target Q1 Q2 Q3 Q4 Total % Target
Achieved NLC SLC
Total
Enquiries 3000 798 833 621    3188  106%
1726 1462
936  54%  46% 
Pre-Start/  
New  2000 549 593 415 615 2172 109%
1186 986
Business
Enquiries 55% 45%
Existing
Business
Enquiries   1000 249 244 206 317 1016 102%
540 476
53% 47% 
2.3 Total Enquiry volumes exceeded targets in the period 2025-26. Performance was led
by strong demand from pre-start/new businesses while existing business enquiries
surpassed target for the first time since 2022. 
Enquiries were broadly balanced across both North and South Lanarkshire with the
strongest enquiry months in April, September, January and March.  These months
involved key activities including; the launch of Council grant programmes and the
Expert Help framework, Startup focus month with significant local marketing activity
and a joint event supporting the Creative, Construction and Care sectors. 
The proportion of enquiries resulting in successful new business starts during 2025/6
was 1:3 this is an improvement on the 2024/5 performance level of 1:4. 
Business Start Up Service 
2.4 Prior to being allocated a dedicated business adviser, clients at the pre-start stage are
encouraged to complete a Planning to Start review which provides an overview of the
stage they are at on their start up journey. This enables an adviser to have a more
meaningful initial interaction with the client and for an individually tailored action plan
to be produced. It also allows the adviser to identify potential early-stage growth
businesses and classify them as pre-start plus, enabling more intensive support to be
provided. 
Once a pre-start client commences trading, the business is classified as either a New
Business or, if it has growth potential (hiring a team member, taking on a premises
and/or achieving the VAT threshold) as New Business Plus, with ongoing support being
provided during the first 12 months of trading. 
Page 83 of 110

Page 84

2.5 2025/26 Performance: 
Service Target Q1 Q2 Q3 Q4 Total % Target
Achieved NLC SLC                    
New
Business
Starts
650 150 172 138 142 602 93%
339 263
56% 44%
New
Business
Plus
60-
100 32 23 21 10 86 143%
48 38
56% 44% 
2.6 The number of customers supported to start a business remained strong during 2025/6.
The 602 new business starts fell short of the target of 650 and can be attributed to a
reduction in resource within the team of 8 business advisers (staff changes and
absence).  The New Business Plus categorisation exceeded the minimum target set. 
Performance has improved compared to previous years, although challenges with early
stage growth include changes in employment law, inflationary pressure and the impact
of increased National Insurance. 
2.7  The service continues to support a diverse range of customers into starting a business. 
Of those supported, 336 businesses were female-led, representing 56% of all startups
and reinforcing that the support is accessible and relevant to female customers across
the area.  Representation from minority ethnic communities continues to grow, year on
year with 40 customers progressing to start across Lanarkshire.  
Engagement from young people under 25, showed positive movement with North
Lanarkshire experiencing almost a 50% increase on the previous year at 46 starts,
while South Lanarkshire remained in line with the previous year at 30.  The number of
customers reporting a disability and starting a business, also increased across both
areas, rising by approximately 50% year on year to 26 in North Lanarkshire and 17 in
South Lanarkshire. 
Specific activity with Pop up display stands and leaflets in Colleges, Job centres,
presence at Job fayres and local community engagement event has worked well. 
Community champions will build on this progress by strengthening and expanding
pathways that improve engagement among underrepresented groups.  Key delivery
partners include The King’s Trust, DWP, Routes to Work (north and south) and the
colleges where joint working has contributed to the increase in engagement and
startups. 
Existing Business Services 
2.8 Businesses trading for more than 12 months are regarded as existing businesses and 
classified in one of the following ways: 
1. Business Base – Any business that does not satisfy the criteria below or require
intensive adviser support
2. Local Priority – A business that needs assistance to survive or achieve modest
growth and which satisfies local priority criteria set out in section 1.4
3. Business Gateway Growth – A business with plans to increase turnover by a
minimum of £200,000 within 3 years. 
Page 84 of 110

Page 85

2.9 2025/26 Performance  
Service Target Q1 Q2 Q3 Q4 Total % Target
Achieved NLC SLC
Business
Base 750 231 185 188 291 895 119% 477 418
53% 47%
Local
Priority 100 20 12 26 52 110 110% 60 50
55% 45%
Business
Growth 150 28 36 36 29 129 86% 76 53
59% 41% 
2.10 The performance was positive overall as the Business Base exceeded target with
delivery building through the year and peaking in Q4 (291).  This was due to the
marketing activity to reach out to businesses within the Business Gateway database
not currently receiving support to offer business support. 
Local Priority also surpassed target - driven by a strong performance in Q3 & Q4.  The
Business Growth categorisations fell short of target but had relatively steady quarterly
performances. The shortfall to target was a direct result of a reduction in resource (staff
absence). 
Expert Help Support (including Expert Surgeries and workshops)
2.11 The Framework Agreement for Expert Help consultancy support allows SMEs based in
Lanarkshire to receive a one-hour surgery, 1 day (7 hours) or up to five days (35 hours)
of fully funded consultancy support. This ensures that, in addition to 1-2-1 generalist
support from a Business Gateway adviser, customers can access qualified consultants
to provide bespoke advice and support. 
The procurement of the Expert Help Framework covers 4-years provision (2025-29)
with the option to renew each year.  The total value of the Framework is £1.4m over
the 4-years (£350K per annum). 
Quality Assurance 
2.12 The quality of Business Gateway service delivery in each Local Authority area is
monitored by BG National via an independent research organisation – The Progressive
Partnership.  A survey is emailed to customers that have interacted with the service
within two weeks and feedback is sought about satisfaction levels related to six criteria
as shown in the table below.   
Based on client feedback, a score is generated on the number of very satisfied/satisfied
responses received and measured against the national target of an 80% positive
response.  The respondent numbers are less than 5% of the total number of customers
using the service, therefore Business Gateway at a national level is exploring new
approaches for securing more meaningful engagement and feedback. 
Page 85 of 110

Page 86

2.13 2025/26 Performance: 
Service Average to date  
NLC SLC
Satisfaction with BG 79% (71) 80% (69)
Expectations Met/Exceeded 79% (70) 77% (69)
Beneficial to Business 67% (39) 68% (38)
Likelihood to Recommend 75% (69) 78% (69)
Likelihood to Keep Using 75% (69) 83% (69)
Satisfaction with Staff 89% (39) 85% (41) 
2.14  As the response numbers for Lanarkshire are very low, they do not provide an accurate
reflection of overall performance.  However, the customer satisfaction measures for the
small numbers demonstrate a strong and improving service offer across both North and
South Lanarkshire.  The average scores for overall satisfaction and expectations being
met/exceeded highlight consistent delivery against client needs.  Satisfaction with staff
is a particular strength with high averages of 89% in north Lanarkshire and 85% in
south Lanarkshire.   
Workshops/Events
2.15 A wide range of on-line webinars & tutorials are delivered by Business Gateway
nationally addressing a variety of business themes with quality content and
professionally delivered. 
In addition to the national offer, the advisory team responded to customer feedback
and created new monthly bootcamps which cover the main topics of startup, marketing,
cash flow and business planning.  This allows advisers to deliver support on a “one to
many” approach, maximising resource in the locations where there are a high volume
of enquiries.  This format also allows customers to meet in their local area and provides
the opportunity to network with others whilst starting to build a customer base and
secure supply chain contacts. 
2.16 Workshops and attendance is noted below:  
Service Q1 Q2 Q3 Q4 Total NLC SLC                
Local Workshops 5 5 6 9 25 14 11
Booked 104 122 136 198 560 -  -
*Attended 69 80 61 116 *326 163 147                
National Workshops 109 113 90 124 436 -  -
Booked 907 968 657 1152 3684 -  -
Attended 438 387 390 501 1761 761 1000     
*Note: Total attended figure includes people from outside NLC & SLC. 
2.17 The Business Gateway National events programme has recorded a total of 1761
Lanarkshire clients attending a variety of online events.  Despite the higher than 50%
drop off rate from booking to attending, 761 customers were from North Lanarkshire
and 1000 from South Lanarkshire.   
Page 86 of 110

Page 87

Each of these customers have a profile created in CRM and weekly checks by the
admin team ensure that an adviser is allocated to follow up with the customer to engage
and provide support if required.     
To date, the local workshop offering includes monthly bootcamps for the startup/new
business customers and monthly workshops style/networking events for the
established business community.  The attendance ratio is much higher for these in
person events covering key business topics with 326 participants attending; 163 from
north, 147 from south Lanarkshire and 16 from outside the Council areas. 
The towns where events have been hosted include: 
• North – Airdrie, Cumbernauld, Bellshill, Motherwell, Kilsyth
• South – Larkhall, Douglas, Blantyre, Hamilton, Bothwell, Lanark 
Established business events allow the service to deliver information on trending topics
for business owners using the Expert Help Framework and consultants.  Subjects
include; Cyber-crime and resilience, AI, NetZero, internationalisation and Business
Strategy, Making Tax Digital, Procurement and Digital Marketing.  By providing a space
for customers to network with other business owners and share experiences and/or
best practice, the Business Gateway team can then offer access to Expert Help and
other Council provisions, including signposting to employability and grant funding. 
2.18 Community Engagement 
A comprehensive programme of engagement was delivered across North and South
Lanarkshire throughout the year. This included attendance at a range of regular
networking events to build new connections, such as the Federation of Small
Businesses, EK Collective co-working space, the Lanarkshire Hub monthly meetings,
and The Hive's "Meet the Adviser" sessions. In addition, a number of sector-specific
and partnership events were supported, including Meet the Buyer (Clark Contracts) in
Airdrie, Skilled Trades and Build Lanarkshire activities, employability and skills
engagement initiatives, DWP Jobs Fairs, college presentations, and support for the
Lanarkshire Business Awards, Dragons' Lair, and Sharks' Reef programmes. 
The creation of the community champion role has provided clear ownership of key
towns and allowed each team member to take a more organic approach to local activity. 
This has enabled Advisers to explore key projects and initiatives across all large towns
and strategic economic areas in north and south Lanarkshire.  The ambition is to
strengthen connections between strategic services and communities, ensuring the
business support service is accessible, visible and relevant across Lanarkshire. 
2.19 Marketing 
Activity during the year focused on expanding Business Gateway Lanarkshire’s brand
visibility through targeted community outreach. This included increased presence
within the education sector, with marketing materials and digital screens at New
College Lanarkshire and South Lanarkshire College and engagement with
DWP/Jobcentre partners across Lanarkshire supported by pop-up promotion and
leaflets.  
To raise awareness of available business grants and reach an existing business
audience, a two-week digital marketing campaign was delivered during Q3. This
generated over 250 enquiries of which 200 were allocated across the advisory team. 
Over 70% were from established businesses – of which there was a good split between
Page 87 of 110

Page 88

new and lapsed customers.  This demonstrated the effectiveness of targeted digital
activity in stimulating demand and re-engaging previous service users. 
2.20 Business Gateway Service Improvement Plan 
The review of the Business Gateway operating model aims to modernise the service
by improving customer experience, strengthening business outcomes, and making
more effective use of resources. The proposed changes respond to increasing
demand, the need for more targeted support, and a greater focus on measuring
business growth and economic impact.
The revised model will introduce enhanced customer triage, reduce routine adviser
activity, and increase specialist senior adviser capacity to provide more intensive
support to priority and growth businesses. It will also strengthen partnership working,
improve use of staff skills, and support a more proactive approach to business
engagement.
Overall, the operational changes are expected to improve service efficiency and
resilience, enhance support for high-potential businesses, and deliver stronger
performance monitoring and economic outcomes across Lanarkshire. 
The expected benefits include:
• Improved customer experience by focusing support on engaged clients.
• More adviser time available for meaningful interventions and business growth
support.
• Increased community presence through customised workshops, outreach and
partnership activity.
• Stronger pipeline of viable start-ups and growth businesses.
• Enhanced support for businesses with complex needs, including growth,
investment readiness, business survival and succession planning.
• Better alignment of staff skills and roles, improving service quality and resilience.
• Improved performance monitoring through regular reviews, impact tracking, and
outcome-based reporting.
• Creation of a strategic portfolio of Lanarkshire's key SMEs, enabling targeted
support and stronger economic impact measurement.
The proposed model shifts the service from a largely reactive, enquiry-led approach to
a more targeted, proactive and impact-focused model.  This will ensure resources are
directed where they deliver the greatest value to businesses and the local economy. 
3. Measures of success 
3.1 The proposed service improvement plan will support and enable the following service
targets to be achieved during 2026/27:  
• 3000 Total enquiries generated through national and local marketing activities
(minimum baseline)
• 2000 Pre-start customers supported (minimum baseline)
Page 88 of 110

Page 89

• 650 – New businesses supported to start (retained at current level)
• 72 New Business Plus businesses supported (minimum baseline)
• 1000 Established business customers supported (minimum baseline)
• 80 Local Priority or Growth category businesses (per Senior Business Adviser)
actively supported (new target linked to service improvement plan)
3.2  Quality of service delivery will continue to be measured by an independent third party,
co-ordinated by Business Gateway National to achieve a target of 80%. 
3.3 The Business Gateway Lanarkshire service contributes towards the achievement of
National Health Check Indicators by supporting growth in new business starts and
improving the long-term sustainability and survival of local businesses. Office for
National Statistics (ONS) Business Demography statistics record local and national
performance and this will act as a baseline for future reporting as outlined below: 
• New Business starts per 10,000 working age population (16-64 years)
2024:  North Lanarkshire: 51    Scotland: 51 
• % of VAT/PAYE registered businesses that survive for at least 3 years
2021- 2024:  North Lanarkshire: 53.4%  Scotland: 57.6%   
4. Supporting documentation 
• Appendix 1 – Business Gateway Lanarkshire Performance infographic 2025/6 
Pamela Humphries 
Chief Officer (Place)  
Page 89 of 110

Page 90

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The service is open to all seeking assistance to set-up or grow a business. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments   
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
HR advice was taken and acted on in relation to the service improvement plan
(2026/7). 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
Page 90 of 110

Page 91

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
BGL services will continue to be actively marketed to local communities including
through Council social media and established communications channels.   
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
A risk register for the service is in place and monitored in line with council
guidelines. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 91 of 110

Page 92

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 92 of 110

Page 93

Appendix 1 – Annual Performance infographic: 
Page 93 of 110

Page 94

Page 94 of 110

Page 95

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref     GPT-E&C-004 Date 21/08/26 
Braidhurst Industrial Estate – Contract Variation 
From  Pamela Humphries, Chief Officer (Place) 
E-mail Stuart Hodge, hodges@northlan.gov.uk 
Executive Summary 
In accordance with the council’s Financial Regulations, this report notifies the Committee
of the Braidhurst Industrial Estate contract spend as the expenditure levels exceeded the
contract award levels by greater than 5% or £25,000. 
This regeneration project attracted significant external funding support, with over half of the
funding coming from the Scottish Government’s Regeneration Capital Grant Fund and
Place Based Investment Fund as well as £600,000 match funding from North Lanarkshire
Properties (NLP). 
Having recently completed in Summer 2026, the project has delivered upgrades to the
general infrastructure of Braidhurst Industrial Estate including road and car parking works,
as well as refurbishing 6 existing NLP owned and operated units to bring them up to modern
standards and prolong the lifespan of these light industrial workspaces. Furthermore, 10
new industrial units have been constructed on a parcel of vacant and derelict land on
Newhut Road within the estate, providing industrial units suitable for SME’s, a place for
North Lanarkshire businesses to start and grow. 
Two of the ten newly constructed units will be reserved as rent-free spaces for community
purposes, with details of tenants to be confirmed soon. 
The project is estimated to create up to 27 full-time equivalent (FTE) permanent jobs as
well as safeguarding 80 existing jobs. 
This North Lanarkshire Council led project has also enabled private investment at the
entrance of the estate, with a local life sciences business investing in the former vacant
B&Q site, converting the property for their own purposes, retaining their business within
North Lanarkshire and providing opportunities for expansion.   
Recommendations
It is recommended that the Enterprise and Fair Work Committee: 
(1) Acknowledge the content of this report.
Item 6
Page 95 of 110

Page 96

1. Background
1.1 The council’s Financial Regulations state that any variations where the
outturn/expected costs exceed the tendered contract price by the higher of £25,000 or
5%, or where the outputs/outcomes achieved by the expenditure differ from those
originally envisaged, shall be reported by the appropriate Chief Officer to the relevant
Committee. 
1.2 Due to the nature of construction contracts, a flexible approach is required to manage
contract deliverables and desired outcomes and typically this is achieved by the
inclusion of a contingency allowance to address unknown quantities or abnormalities. 
1.3 Any construction works undertaken within the council’s portfolio may encounter issues
that can result in additional costs after work has commenced. Large and complex civil
engineering projects can present difficult ground conditions which have to be managed,
addressing these issues is expensive. Asbestos is problematic and costly to address,
as is rot works, especially within the Council’s ageing property estate. Working within
“live” environments and restrictions of access is another contributing factor to
prolongation related claims, with other expenditure being attributed to health and safety
issues including addressing fire stopping issues. Additional client instructions being
added to contracts following award will also increase the overall contract sum, but it
should be noted that the scope of these instructions will be within the parameters of the
original tender documents and rates will be a direct drawdown from those already
provided or a benchmarking exercise is undertaken to demonstrate value for money. 
1.4 The regeneration of the Braidhurst Industrial estate in Motherwell incorporated the
following objectives: 
• Purchase of the vacant and derelict former Eagle Inn public house site on Bellshill
Road.
• Purchase and demolition of the former bookmaker’s cabin fronting onto Bellshill
Road.
• Demolition of fire damaged / partially collapsed buildings on the vacant and
derelict land.
• Refurbishment of six North Lanarkshire Properties (NLP) owned industrial units,
bringing these dated units up to a modern standard and safeguarding them for
years to come.
• Creation of a new car park on the former Eagle Inn pub site.
• Upgrade of existing car park.
• Road and drainage improvements along Newhut Road.
• Upgrade of turning head at the end of Newhut Road to facilitate improved delivery
vehicle movements.   
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (3) Maximise the use of our marketable land and assets through
improved development in business and industrial infrastructure
Programme of Work Transforming Places
Page 96 of 110

Page 97

• Development of 10 new start-up industrial units on the NLP owned vacant Newhut
Road site, providing vital supply of incubator units for local SME’s to start-up and
grow their businesses in North Lanarkshire. 
• Two of the ten units will be used by community organisations, with tenants still to
be confirmed
1.5 The project secured £1.9m from the Scottish Government’s Regeneration Capital Grant
fund, and a further £1.98m was allocated from the Scottish Government’s Place Based
Investment Fund, as well as a contribution of £0.6m from North Lanarkshire Properties.
The balance of funding has been met from the Place service’s Economic Regeneration
capital programme allocation. 
1.6 The construction contract to deliver the main works was awarded in accordance with
the Council’s Contract Standing Orders in August 2023 at a value of £5,861,989 and
was reported to the Enterprise and Fair Work Committee in September 2023. 
2. Report 
2.1 The regeneration of the Braidhurst Industrial estate has now been completed, and all
the original and planned objectives have been delivered. 
2.2 The six existing NLP owned units which were refurbished as part of this project were
leased to four tenants (one tenant had three units). All of the original tenants were
relocated to other NLP owned industrial estates to facilitate the refurbishment. 
2.3 Of the four tenants, three have expanded their operations since relocating to new units
owned and managed by NLP. 
2.4 Following completion of the refurbishment, three units have been leased to a company
already located on Braidhurst Industrial Estate who are having to vacate their current
unit by September due to the owner selling the property. They were considering closing
down so relocation to the NLP units has safeguarded 58 jobs.   
2.5 NLP are progressing with the lease of a fourth existing unit and have had interest in the
remaining two units. 
2.6 Of the 10 new industrial units, NLP are finalising lease arrangements with one new
tenant. Once fully occupied and let, it is estimated that these new units will create
around 27 FTE jobs. 
2.7 As part of the conditions of the RCGF funding, two new units are to be leased rent free
to community or charitable organisations. NLP are currently in Heads of Terms with
one charity organisation. 
2.8 NLP are confident that all the units will be leased quickly as they are comparable with
the units at Spruce Court, Motherwell, which are fully occupied. Rents for the new
Braidhurst units will be set at a level similar to the Spruce Court estate. 
2.9 Private sector investment has also flowed into the industrial estate, as an indirect
benefit of the North Lanarkshire Council led project. A local life sciences business
Page 97 of 110

Page 98

purchased the former B&Q site which was vacant. Following conversion, the business
is now operating from their new Motherwell base, retaining these high-skilled jobs within
North Lanarkshire and providing opportunities for future growth of the business.
2.10 However, the final contract value is projected to be £7,717,762, which is approximately
£1.856m higher than the original contract value. 
2.11 The project has been significantly affected by issues with utilities and utility providers.
On breaking ground an uncharted utility pipe was uncovered resulting in a 6-week
programme delay whilst the owner of the pipe was identified, and confirmation was
obtained that the pipe was redundant. 
2.12 Further contract delays were caused by utility provider, SPEN, whereby unforeseen but
necessary works were required.  This included the installation of electrical meters in
the new industrial units connecting to the grid. Over and above this, a late requirement
for SPEN’s infrastructure in the substation to be upgraded led to substantial delay and
resulted in the site being decommissioned and subsequently recommissioned having
an impact on programme and cost.  SPEN did not advise that this upgrade was required
for the commissioning of the units until a late stage.  This was non-negotiable with
SPEN and highlights the detrimental impact that utility companies can have on project
delivery.   
2.13 Additional works were required to the 6 existing units to bring them up to current
standards, including electrical safety and fire protection measures. The extent of this
work was not fully identified during the pre-works surveys of properties due to the units
being occupied and therefore full intrusive surveys were not possible. 
2.14 Additional spend was incurred due to ground conditions including soft spots which were
not identified during site investigations resulting in additional ground remediation works. 
Unforeseen costs also arose from additional ground remediation and excavation works
on the site of the new units due to greater and deeper levels of contamination than
testing allowed for during the project feasibility stage and tree roots growing through
utility cabling which required unplanned excavation. 
2.15 During the works, amendments to scope of the retaining wall as required by Network
Rail, additional surveys and unplanned work to the surface water drainage due to the
condition of the drains, additional sub-surface works to Newhut Road to build up soft
ground all contributed to the increased spend. 
2.16 While a successful project, in terms of the project deliverables and long-term
regeneration benefits, the project has been challenging particularly with the
dependency on external parties, in this case SPEN, with very limited influence over
their programming and costs which has resulted in the overspends detailed above.   
2.17 The Project team have carried out a lessons learned workshop to identify challenges
and how these could be prevented or mitigated for future projects.  The lessons learned
have been documented and shared, feeding into project management areas such as
project development including scope and feasibility, cost estimates and contingency
allowances, contract management arrangements, risk and issue management and cost
control. 
Page 98 of 110

Page 99

3. Measures of success 
3.1 The project has successfully delivered on its objectives outlined at 1.4 to regenerate
the Braidhurst industrial estate and help create new employment opportunities. 
3.2 The units are leased for market value and two charitable organisations are awarded a
rent free unit each as per the RCGF funding conditions. 
3.2 Contracts containing variances are managed by the council and are compliant with
Financial Regulations, GSCOs and procurement legislation. 
4. Supporting documentation 
4.1 There is no supporting documentation. 
Pamela Humphries
Chief Officer (Place)  
Page 99 of 110

Page 100

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The impacts have been agreed with Finance and the figures and sources of
funding agreed.  The additional spend has been met by the Place Based
Investment Programme and the Place Service’s Capital funding. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
Page 100 of 110

Page 101

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Contract management procedures may be susceptible to financial claims and legal
challenge if they are not discharged in accordance with Contract Conditions,
Financial Regulations, GCSO’s and procurement legislation.
Accumulation of contract overspends may impact on future Capital Programmes.
Project risks are logged on the appropriate Risk Registers and managed by the
Service.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 101 of 110

Page 102

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 102 of 110

Page 103

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  (AG/PK) Date 21/08/26 
Re-appointment of Category B Directors - Routes to Work Ltd 
From  Alison Gordon, Chief Social Work Officer (Education, Families, Justice &
Integrated Practice)  
E-mail gordonal@northlan.gov.uk   
1. Background 
1.1 Routes to Work’s Board of Directors consists of up to twelve members – two are
Category A members appointed by North Lanarkshire Council (one is an elected
member, and one is a senior council officer) and up to ten Category B directors, who
bring specialist expertise to the company and are selected through a formal nomination
procedure. 
1.2 The Board of Directors is responsible for ensuring that Routes to Work’s services are
delivered in accordance with approved Service Level Agreements and charitable
objectives and Board memberships are unpaid. The Board meets quarterly to fulfil its
Executive Summary 
This report concerns the re-appointment of four Category B directors to Routes to Work
Limited (RTW) who are reaching the three-year limit on their appointment by the Council
and are willing to be re-appointed. 
Recommendations
It is recommended that the Enterprise & Fair Work Committee: 
(1) Approve the re-appointment of the four Category B directors, referred to in section
2.3, to the Board of Directors of Routes to Work Limited. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement
(11) Increase economic opportunities for adults by understanding,
identifying, and addressing the causes of poverty and deprivation
and barriers to financial inclusion
Programme of Work Brighter Futures 
Item 7
Page 103 of 110

Page 104

governance responsibilities which include operational delivery and management,
staffing, financial control and reporting, health and safety, risk management and
performance monitoring and reporting. There are three formal sub-groups of the Board
that meet regularly.  These have remits for Governance, Human Resources, and
Finance. 
2. Report  
Provisions of Articles of Association
2.1 The Articles of Association of Routes to Work Limited include the following provisions
in respect of the composition of the Board of Directors and the appointment of
Independent Directors: 
60.2 a maximum of 10 directors shall be Category B Directors, who shall be
appointed (after due consideration of the views of the board of directors) on the basis
that: 
60.2.1 they are representative of the community within the local authority area of the
Council; and/or
60.2.2 they have specialist skills or expertise which would be of assistance to the
board.
2.2 Under the terms of Article 65.1 the Council may appoint/ re-appoint any Category B
Director (other than an officer, elected member or employee of the Council) in writing
and signed by an appropriate officer with the guidance of the company’s nominations
sub-committee.  The appointment/ re-appointment of Category B directors is for a
period of 3 years, after which directors must resign or be re-appointed by the Council
and under Article 67 the Council is guided bt the Nominations Committee of Routes to
Work ltd in its appointment of Directors. In addition, the Council can remove any
Category A or B director from office at any time. 
2.3 The re-appointment of the four Category B Directors listed below has been discussed
at the Routes to Work Ltd Board and it was agreed that the Council be approached to
secure the necessary approval for these re-appointments. The directors seeking re-
appointment are: 
(i) Professor Dr Christopher Moore
(ii) Phil Kinnell
(iii) Alan Hughes
(iv) David Strain 
2.4 The independent directors proposed for re-appointment have clear expertise within
areas that can support Routes to Work Ltd and a profile of each is included in Appendix
1. 
Page 104 of 110

Page 105

3. Measures of success 
3.1 Routes to Work Limited continues to utilise the experience and support of its
independent directors. 
4. Supporting documentation 
4.1 Appendix 1 Profile of Category B Director Proposed for Re-appointment to Routes to
Work Limited Board. 
Alison Gordon
Chief Social Work Officer (Education, Families, Justice & Integrated Practice) 
Page 105 of 110

Page 106

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty   
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
The financial performance of Routes to Work is closely monitored by the council’s
Section 95 Officer and the financial performance as detailed above, along with
other key financial information presented in the report. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Page 106 of 110

Page 107

Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Routes to Work maintain a detailed risk register which is presented to each Board
meeting.  In terms of the Council, the risk of Routes to Work and the wider
employability programmes being deemed non-compliant with external funders is
present and controlled through the strong monitoring arrangements and reflected in
Council risk registers. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
Page 107 of 110

Page 108

If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒ 
Page 108 of 110

Page 109

APPENDIX 1
Profile of Category B Directors Proposed for Re-appointment to Routes to Work
Limited Board:
1. Professor Dr Christopher Moore
Professor Moore is Principal and Chief Executive of New College Lanarkshire. Prior to his
appointment at NCL, he held senior leadership roles at Universities in Edinburgh, Glasgow
and York. He has a Professorship at the University of Manchester and was recently appointed
as visiting Professor at the University of the West of Scotland. With a PhD in Marketing, he
has a business research background and served for three years as expert adviser to the
Management Board of Marks & Spencer PLC. During his time at NCL, he has established an
Undergraduate School, a digital learning campus, as well as the first national Centre for Brain
Health in Health and Social Care in Scotland. In Autumn 2026, NCL will launch the Scottish
Centre for Dental Nursing Education at the Coatbridge campus.  Professor Moore serves as
the Vice Chair of the Coatbridge Neighbourhood Board and was appointed Deputy Lieutenant
for Lanarkshire in January 2026. 
Since being established in 2002 the Principal of New College Lanarkshire has always been
invited to play a role on the Routes to Work Board, and this reflects the clear links between
reducing unemployment and skills development. 
2. Philip Kinnell 
Phil is an expert procurement professional who has recently taken up a senior role with
Scotland Excel, having previously worked with BIP Solutions Limited for over 23 years in a
variety of procurement and supply chain roles, including a two year secondment and the
delivery of research services to the Scottish Government.
It was during his time at BIP Solutions when Phil first came into contact with Routes to Work
Ltd when he led on the project in 2016 to establish our public procurement function, including
analysis of the legal and practical aspects, delivery of a Procurement Manual and Knowledge
Transfer Workshops for the wider management team and connected stakeholders. Since this
commission in 2016, Phil has provided both commissioned and pro-bono support to the
management team at RTW around various procurement matters and stated in his application
that he has “long admired Routes to Works's role in securing sustained employment and
changing many thousands of lives for the better. Working with an organisation with such a
great reputation and the opportunity to make a positive socioeconomic impact is something I
know I’d find fulfilling”. 
Having left the organisation that had a commercial relationship with Routes to Work Ltd
around 3 years ago, Phil was free to join the Board with the support of his new employer and
has been a member of the Routes to Work Board for most of that time. Phils’ Skills include: 
Procurement Practitioner - Public procurement practitioner and consultant with expansive
knowledge of EU Procurement Directives, Scottish and UK legislation, policy and public
procurement case law (UK and EU). Experienced Project and Programme Manager/Director.
Practical commercial experience of regulated procurement and supply chain management
including, market engagement and sourcing, negotiation and contract management.
Experienced at drafting specifications, contract documents (e.g. award letters), and all other
required documentation for public procurement exercises. 
Phil also has an excellent depth of knowledge, experience and skills in training, research,
eLearning and supply chain development. 
Page 109 of 110

Page 110

3. Alan Hughes
Over the course of his career in education and economic development, Alan has worked on
both policy development and operational delivery, enabling him to understand the intricate
dynamics of program implementation and its alignment with broader strategic goals. 
He began his professional journey as an enterprise development officer in Craigmillar,
Edinburgh, where he spearheaded initiatives to establish a credit union, community
businesses and coordinated transnational projects, empowering young individuals with
essential work-related skills. Alan has spent the largest proportion of his working life in
Lanarkshire with the Lanarkshire Development Agency and Scottish Enterprise and with the
college mergers and has seen first-hand what a difference Routes to Work has made over
the years and is keen to make sure that success continues. Alan has been a member of
Routes to Work Board for almost 3 years. 
Throughout his career, Alan has maintained an unwavering passion for creating opportunities
for individuals to access the job market, opening doors for their personal and professional
growth. As a transformation and technology consultant, his commitment to this cause has
only deepened over the years. Recently, while working in the technology sector has been
actively exploring ways to collaborate with voluntary sector agencies to provide valuable
training and employment prospects through the innovative use of Salesforce technology. 
In addition to his experience in education and economic development, Alan possesses a
strong grasp of governance principles having established the Joint Skills Committee for the
Scottish Funding Council and Skills Development Scotland. 
Current and recently held positions: 
• Graduate Mentor for Edinburgh Napier University 
• GDPR and PCER champion University of Edinburgh 
• Member of CRM Higher Education Group 
• Advisor Larbert High Schools STEM Academy 
• Member of the Scottish Governments Skills Utilisation Advisory Group 
• Founding director of Edinburgh Community Food Initiative in the 1990s. 
4. David Strain 
David is a highly accomplished business leader/ mentor offering a wealth of expertise from
start-ups and charities to senior roles in blue-chip corporations. He has extensive experience
across a diverse range of industries with international companies .
Consistently driving company developments, ensuring impressive improvements in
profitability and efficiency, David is skilled in leading highly complex change management. A
strategic thinker with keen problem-solving abilities, David draws on over 25 years’
experience, bringing invaluable insight and intrinsic worth to the Board room. 
David was born and brought up in North Lanarkshire and spent the largest slice of his career
working for Honeywell, probably the largest private sector employer in NL, where he started
as an apprentice and progressed to senior global roles. In the last 5 years since moving into
semi-retirement, David has used his experience and talent in advisory board and Non-
Executive Director roles which he believes could provide valuable experience for the RTW
Board.
David has been a member of Routes to Work Board for almost 3 years. 
Page 110 of 110