Page 1

06 May 2026. 
Members of the 
Enterprise and Fair Work Committee
Chief Executive’s Office
Rachel Blair
Chief Officer (Legal, Democratic and Strategy)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk 
Notice is given that a Meeting of the Enterprise and Fair Work Committee is to be held in
the Council Chamber, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on Friday, 15
May 2026 at 10:00 AM which you are requested to attend. 
The agenda of business is attached. 
Rachel Blair
Chief Officer (Legal, Democratic and Strategy) 
Members : 
Clerk Name: Karen Swan
Clerk Telephone: 07919 730 272
Clerk Email: committee@northlan.gov.uk 
A McVey, F McKay, M Boyd, A Bustard, J Cairns, G Currie, K Docherty, A Duffy-Lawson, H
Dunbar, F Fotheringham, W Goldie, H Gray, A Khan, J Leckie, F MacGregor, A Masterton,
B McCulloch, M McPake, L Nolan, D Robb, G Robinson, W Shields, R Sullivan.  
Page 1 of 128

Page 2

Page 2 of 128

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical
Standards In Public Life Etc. (Scotland) Act 2000 
Operational 
2 City Deal Programme Update
Submit report by the Chief Officer (Place) informing of
the current status of North Lanarkshire City Deal
Infrastructure Programme and its subprojects. 
5 - 16 
3 External Funding Report
Submit report by the Chief Officer (Place) providing an
update on the council’s recent progress in developing
and securing external funding for physical regeneration
projects across North Lanarkshire. 
17 - 26 
4 Routes to Work Service Level Agreement 2026-27
Submit report by the Chief Social Work Officer
(Education, Families, Justice and Integrated Practice)
seeking approval of the Service Level Agreement with
Routes to Work Ltd for 2026/27. 
27 - 60  
Performance & Financial 
5 Routes to Work Ltd – Performance & Financial
Monitoring Report
Submit report by the Chief Social Work Officer
(Education, Families, Justice and Integrated Practice)
outlining Routes to Work Ltd.’s performance against its
charitable objectives and Council priorities for Q2
2025/26 to the end of Q3 2025/26. 
61 - 86 
6 Fusion Assets’ Performance and Financial
Monitoring Report
Submit report by the Chief Officer (Place) providing
details of the operational performance of Fusion Assets
Limited during 2025/26. 
87 - 106 
7 Strategic Performance Framework - latest
performance results for Employability
Submit report by the Chief Social Work Officer
(Children, Families, Justice and Integrated Practice)
providing a performance overview for Employability for
2025/26. 
107 - 116  
Contracts 
Page 3 of 128

Page 4

8  Contract Award for Ravenscraig Access
Infrastructure South Detailed Design
Submit report by the Chief Officer (Place)
acknowledging the award of a contract for Detailed
Design work for Ravenscraig Access Infrastructure
South (RIAS) (the ‘Agreement’). 
117 - 128 
Page 4 of 128

Page 5

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    LN/PH Date 15/05/26 
City Deal Programme Update 
From  Pamela Humphries, Chief Officer (Place)  
E-mail Lyndsay Noble, NobleLy@northlan.gov.uk 
Executive Summary 
The North Lanarkshire City Deal Programme Update Report seeks to inform the Enterprise
and Fair Work Committee of the current status of North Lanarkshire City Deal Infrastructure
Programme and its subprojects.       
Recommendations
It is recommended that the Enterprise and Fair Work Committee: 
(1) Acknowledges the status and recent progress of North Lanarkshire City Deal
infrastructure subprojects and revised programme. 
(2) Acknowledges the updates to the project delivery timescales following programme
reviews to manage and coordinate delivery phases and minimise disruption to local
road networks. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (5) Grow and improve the sustainability and diversity of North
Lanarkshire's economy
Programme of Work Transforming Places
Page 5 of 128

Page 6

1. Background 
1.1 The Glasgow City Region (GCR) City Deal is an agreement between the UK and
Scottish Governments and the eight GCR Local Authorities, with the sole focus of
creating additional economic growth.  The 20-year GCR Deal was accepted by GCR
Council Leaders on 20 August 2014 and incorporated: 
• implementing a £1.13bn Infrastructure Fund to improve the regional transport
network, regenerate sites for economic use and improve public transport
provision;
• supporting growth in the life sciences sector;
• helping small and medium enterprises to grow and develop;
• establishing programmes to support the unemployed; and 
• piloting new ways of boosting the incomes of low wage employees.   
1.2 The City Deal Programme for North Lanarkshire, as part of the Infrastructure Fund
comprises the following sub projects: 
A8/M8 Corridor Access Improvements
• Eurocentral Strategic Active Travel 
• Orchard farm Roundabout
Glenboig Link Road (complete)
Pan-Lan Orbital Transport Corridor
• East Airdrie Link Road
• Ravenscraig Access Infrastructure South (Motherwell to Ravenscraig Link and
Airbles Road Improvements)
• Motherwell Town Centre Transport Interchange (complete) 
1.3 The City Deal programme under the Infrastructure Fund also includes the Enabling
Commercial Spaces project following a reallocation of City Deal Funding of
£11,287,602.00.
• Ravenscraig phase 1 – 2 commercial units 
• Ravenscraig phase 2 – 2 commercial units 
• West point, Cumbernauld – enabling works and 2 commercial units.   
2. Report 
2.1 East Airdrie Link Road 
2.1.1 The Project is progressing at pace with the final road alignment concluded and,
following planning application submissions, it is proposed that the preliminary
design moves into the specimen design phase further defining structures,
associated road infrastructure and interfaces with the local road network.  The
council continues to work in partnership with NHS Lanarkshire to ensure the
EALR and the Monklands Replacement Hospital are aligned and the significant
benefits from two transformational projects are fully realised within North
Lanarkshire. 
Page 6 of 128

Page 7

2.1.2 As previously reported, an additional east west link to the East Airdrie Link Road
has been included within the scope of the project, following Policy and Strategy
Committee approval.  This link from Towers Road to the EALR importantly, will
create a second permanent direct route to the hospital for patients and staff,
public transport, active travel and emergency services.  For the EALR, its
introduction adds a valuable east west link to enhance the connectivity to the
local road network. Detailed traffic modelling has taken place demonstrating its
transport benefits and forms part of the Environmental Impact Assessment for
the EALR project. 
2.1.3 The inclusion of the Towers Road Link into the EALR project may allow for a
section of the EALR (including Towers Road Link) to be delivered earlier in the
overall project delivery programme.  Subject to Planning approval and land
acquisition, this early delivery could bring advantages for access to the EALR
and Monklands Replacement Hospital site to aid construction and support de-
risking the programme challenges between the projects and reducing impacts
of inflation on project costs.  The costs of introducing the Towers Road Link and
its subsequent delivery will be supported by a cost sharing agreement between
North Lanarkshire Council and NHS Lanarkshire. 
2.1.4 To facilitate the option of delivering a section of the EALR earlier, two planning
applications for the EALR project will be submitted. As reported to Committee
in February, the first planning application (section one – see figure 1), a joint
submission from North Lanarkshire Council and NHS Lanarkshire, was
submitted in January 2026.   
Figure 1 EALR section 1. 
2.1.5 A second application, for the full EALR scheme is intended to be submitted by
North Lanarkshire Council in May 2026. The application seeks approval for the
whole link road scheme which provides the council, local businesses and
communities with the confidence that the full EALR would (subject to approval)
Page 7 of 128

Page 8

have planning consent.  Achieving this key milestone for the full EALR would
allow the project to progress to the next stage of delivery.   
2.1.6 Working in Partnership with NHS Lanarkshire and subject to planning consent,
land acquisition and FBC approval, it is hoped that section one could commence
on site in Summer 2027, completing in advance of the Monklands Replacement
Hospital opening. 
2.1.7 The remainder of the EALR would follow subject to planning consent and land
acquisition with the full scheme intending to be complete and operational during
2031/32.  It may be that where feasible sectional completion of the full scheme
could possibly be achieved, and a further section becomes operational during
this period. 
2.1.8 It is intended that a Full Business Case (FBC) for section one would be
submitted to the Glasgow City Region for approval following agreement by
Committee. Agreement to submit the FBC will be sought from this Committee
in due course.  The FBC would include the cost sharing agreement with NHS
Lanarkshire for their contribution to section one.  The cost sharing agreement
remains in development and the EALR and Monklands Replacement Hospital
Joint Project Interface Board will have full oversight of how this is put in pace. 
2.1.9 As reported previously, in addition to planning approval, the council will require
to acquire the land to construct the EALR.  With the road alignment finalised,
this allows the land take required to be better understood and for the land
strategy to be implemented.  Given the scale and length of the EALR, the
number of landowners is substantial and the risk of acquiring all the land at the
same time is considered by the EALR project team to be of a level that will
require a compulsory purchase order (CPO).   In time, a proposal for
consideration and approval to promote a CPO for the necessary land for the link
road delivery would be submitted to this Committee. 
2.2 Ravenscraig Access Infrastructure South 
2.2.1   As committee is aware, the Ravenscraig Access Infrastructure South (RAIS)
project, following the removal of the RAI North sub project, now comprises two
sub projects: 
• Phase 1 - a new road connection between Windmillhill Street, Motherwell
and Ravenscraig from Airbles Road, passing under the West Coast Main
Line railway, and on to the Regional Sports Facility 
• Phase 2 - completing the dualling of Airbles Road between Hamilton Road
and Airbles Farm Road, with improved facilities for pedestrians and cyclists.   
2.2.2 A Value Engineering Review has been carried out to ensure the scheme is fit
for purpose and that wider road network schemes can be fully integrated with
RAIS.  The Review identified the need for additional design work to improve
constructability and reduce the cost of construction and future maintenance. 
The contract for the updated detailed design has been awarded. This contract
award is subject to a separate committee paper which notifies committee of the
Depute Chief Executive’s approval of the award in line with General Contract
Standing Orders. 
Page 8 of 128

Page 9

2.2.3 Taking the RAIS project forward, as reported previously, a series of enabling
works will take place over 2026 and will comprise accommodation works,
service diversions and land remediation within Ravenscraig.  As these enabling
works progress over 2026, local members and committee will be kept updated. 
This builds upon the demolition of properties in 2025 to facilitate the new road
infrastructure. The procurement of the main works contract will follow towards
the end of 2026. 
2.2.4 Environmental, geotechnical and noise and air quality surveys have been
commissioned and are ongoing to build on the work to date and support the
detailed design and delivery of the works.  The outcome of these surveys will
inform the additional detailed design and the approach to construction. 
2.2.5 Public consultation took place from 17 November to 14 December 2025,
following the Value Engineering Review.  The updated proposals have been in
general welcomed and supported.  The feedback from the consultation has
been fully considered, reported to local members, published and where
appropriate, will be integrated into the design and the delivery of the new road
infrastructure.   
2.2.6 The programme for the main construction works has been reviewed to take into
account the outcomes of the Value Engineering Review and the appointment of
consultants for the updated design work.  The updated programme has formed
part of a recent members’ briefing and is set out in section 3.  The amendment
to the programme accommodates the requirement for additional design from
the Value Engineering Review to improve the scheme and public feedback.  It
also facilitates an opportunity to bring part of the Airbles Road Improvement
works forward in the programme commencing enabling works during 2026.   
2.3 A8/M8 Corridor – Eurocentral Strategic Active Travel 
2.3.1 The provision of 10km of Strategic Active Travel Links, connecting
Eurocentral/Maxim Office Park/Newhouse and Mossend to surrounding local
communities and local rail stations was approved by GCR Cabinet on 30 August
2022 as the new preferred option for the Eurocentral sub-project.  These routes
are designated as Strategic Network Routes within the North Lanarkshire Active
Travel Strategy. 
2.3.2 As previously reported, a phased approach is being taken to the design and
delivery of the Active Travel routes.  Detailed design work for Phases 1 and 2
of the Project, covering routes from Holytown to Eurocentral, Newhouse to
Holytown and from Whifflet rail station to the M8 active travel route at
Shawhead, is now complete. Concept Design work for Phase 3, covering routes
from Bellshill town centre to Mossend and the M8 active travel route at North
Road, is also complete, with procurement for detailed design and tender
preparation underway. 
2.3.3 In February, Committee was advised that tenders to deliver works contracts to
deliver route sections between Holytown and Eurocentral and Whifflet Corridor
were to be issued via mini-competition using the Glasgow City Council Civils
and Infrastructure procurement framework. These route sections have been
prioritised as providing the most direct linkages between rail stations to both the
north and south of Eurocentral and connect to existing active travel
infrastructure along the M8 and within Eurocentral. Phase 1 (Holytown to
Eurocental) tender has now been published and subject to a successful tender
Page 9 of 128

Page 10

outcome and securing all necessary approvals, it is planned to commence work
on site at Holytown in late summer 2026.  A comparison between the cost,
deliverability and benefits of Phase 2 and Phase 3 will be undertaken in Autumn
2026, following completion of Phase 3 detailed design.  This will determine the
priority to take forward to construction with City Deal Funding in early 2027.  As
per the approved Outline Business Case, external funding will be sought to
deliver the remaining active travel Phase. 
2.3.4 As agreed by committee in February 2026, Full Business Cases will be
submitted to the Glasgow City Region City Deal Programme Management
Office (GCR PMO) for approval of the procurement outcome and release of the
remaining funding for the project.  Subject to approval of the Full Business Case
for Phase 1, it is anticipated that the contract award to the successful contractor
will be approved by the Depute Chief Executive under General Contract
Standing Orders (21.3.2) and reported to Committee in August for noting. 
2.3.5 The council will seek other external funding sources to support delivery of the
remaining routes sections between Newhouse to Holytown; Holytown to
Mossend; Bellshill Rail Station to Mossend and the M8 active travel
infrastructure at North Road. 
2.4  Enabling Commercial Spaces Project (ECSP) 
2.4.1  As Committee agreed in May 2025, £11,287,602 of City Deal funding through
the Glasgow City Region (GCR) Enabling Commercial Spaces Programme was
allocated to support projects at Ravenscraig and Westfield Point, Cumbernauld
to be delivered by Fusion Assets. This funding is to support economic growth
by addressing market failure, creating flexible business space, providing
opportunities for employment and attracting inward investment. 
2.4.2  As Committee is aware, the North Lanarkshire Enabling Commercial Space
project will be taken forward as 3 sub projects - Ravenscraig phase one and two
and Westfield Point.  The 3 sub projects will be submitted as 3 separate Full
Business Cases.  This approach has been adopted by other City Deal projects
and aids programme, cost and risk management.   
2.4.3 Phase 1 Ravenscraig ECSP Full Business Case (FBC) was submitted in
December 2025 (following approval from Enterprise and Fair Work Committee
in August 2025) and was approved by the GCR Director of Regional Economic
Growth (under delegated authority) in January 2026.  Ravenscraig Phase 1
comprises new build construction of 2 buildings totalling 29,210sq ft.  Following
securing the approval of the FBC, the contract was awarded to Luddons, with
works commencing on site in February 2026 and anticipated to be complete by
January 2027.   
2.4.4 Ravenscraig Phase 2 comprises a further 2 industrial units.  The design team
have now been appointed and an FBC will be prepared accordingly to secure
the City Deal Funding.  The FBC will be submitted to Committee seeking the
agreement to submit to the Glasgow City Region for approval.  Phase 2 has an
anticipated works commencement at the end of 2026.   
2.4.5  Westfield Point, Cumbernauld phase 1 will also involve the development of 2
commercial units totalling 21,439 sq ft.  A design team will be commissioned in
due course and an Agreement will be sought during 2027 from Committee for
submission to the Glasgow City Region in due course.
Page 10 of 128

Page 11

2.4.6 A separate Fusion Assets 6 month monitoring report has been submitted to this
Committee.  This report provides further detail on the Enabling Commercial
Spaces Project. 
3. Measures of success 
3.1 The North Lanarkshire City Deal Programme construction timescales have been
updated following a programme review (construction only): 
Glenboig/Gartcosh Community Growth Area: 
• Glenboig Link Road – May 2017 to June 2018 (complete) 
Pan Lanarkshire Orbital Transport Corridor: 
• Muir Street – January 2022 to June 2023 (complete) 
• Ravenscraig Access Infrastructure South – March 2022 to March 2029 - a phased
approach to be adopted with phase 1 Windmillhill Street, Motherwell to
Ravenscraig link June 27 to June 28 and Phase2 Airbles Road Improvements
September 26 to March 29.
• East Airdrie Link Road – August 27 to 2031/32 - a phased approach (subject to
land acquisition and planning permission) will be taken forward with section one
of the EALR is proposed to commence in August 27 and full scheme to follow
with completion during 2031/32. 
A8/M8 Transport Corridor: 
• Orchard Farm Roundabout – October 2026 to October 2027  
• Eurocentral Strategic Active Travel – July 2026 – August 2027 (delivered in
phases) 
3.2  The Programme and its sub projects have been developed to ensure that at a North
Lanarkshire level, North Lanarkshire’s residents and businesses will directly benefit.  
3.3  Each project at Outline Business Case stage and sub-project at Full Business Case
stage has to demonstrate how it will deliver the direct and indirect benefits.  The
Business Cases identify the economic impacts and the Benefits Profile quantify and
details when outputs will be delivered and achieved as a result of the specific project
investment.  
3.4 The benefits will be measured over a 10-year period, reporting as part of the GCR
Gateways until 2035.  Gateway 2, an onerous review of the completed GCR projects
and their outputs and outcomes has concluded successfully which allows for the next
5 year tranche of funding to be released.   
3.5 All North Lanarkshire City Deal contracts seek to maximise community benefits from
contracts awarded for the Project. Community Benefits will be secured through the
procurement of services and works in line with the City Deal Community Benefit
Strategy. The Community Benefits menu within the City Deal Community Benefits
Strategy will be used to target benefits that support the Council’s key aims and
objectives and deliver against priorities.  
Page 11 of 128

Page 12

4. Supporting documentation 
4.1  No Supporting Documents. 
Pamela Humphries 
Chief Officer (Place) 
Page 12 of 128

Page 13

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The City Deal Cabinet has agreed that Inclusive Growth is to be fully embedded
within the GCR City Deal programme delivery and that it is also committed to
supporting the delivery of the Fairer Scotland Action Plan.  Future NLC subproject
OBC/FBC development will be scrutinised to ensure it meets the duties of the
Fairer Scotland Action Plan.  Fair work is integrated into City deal procurements. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Following Committee approval (May 2024) and GCR Cabinet Approval on 6 August
2024, the revised North Lanarkshire Glasgow City Region City Deal Programme is
as follows: 
• Glenboig Link Road                                                         £6.2m
• A8/M8 Corridor Access Improvements
o Orchard Farm                                                          £2.2m
o Eurocentral Active Travel                                        £4.3m
• Pan-Lan Orbital Transport Corridor
o East Airdrie Link Road                                  £185.3m
o Muir Street                                                              £3.8m
o Ravenscraig Access                                               £74.2m
Infrastructure                                                            
• Enabling Commercial Spaces (3 phases)                           £11.3m 
• Total                                                                                   £287.3m 
This is funded £160.3m by the GCR City Deal Infrastructure Fund and £127m by
North Lanarkshire Council. 
The financial implications of the City Deal Programme will be considered within the
council’s Long-term Financial Plan. To date budgetary implications over the next 5
years have been approved by the Policy and Strategy Committee. 
Page 13 of 128

Page 14

5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The City Deal Team work closely with Legal Services on all sub projects focusing
on land acquisition and CPO, procurement and contract preparation and
management, funding agreements and any other related matters. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☒ No ☐ 
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Individual projects under the City Deal Programme will require data management. 
As above, a data protection impact assessment has been and will, where required,
be carried out for projects.  Cybersecurity has been and will be fully considered in
conjunction with the Information Risk and Assurance Team as part of the projects,
procurements and in any required sharing of information. 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☒  
Page 14 of 128

Page 15

5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
All infrastructure projects developed by the council as part of the GCR City Deal will
be subject to relevant environmental and sustainability appraisal and as part of the
design process and subsequent planning application approvals and procurement.   
Furthermore, to adhere with HM Treasury Greenbook best practice, each iteration of
project business case seeking GCR City Deal funding will include a review of the
sustainability considerations, this will include carbon management, involving
categorisation, assessment and mitigation. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The City Deal programme and the delivery of the projects will continue to be
promoted through Corporate Communications and the Glasgow City Region’s
Communications team.   
For the East Airdrie Link Road, a joint communication plan will be developed with
NHS Lanarkshire and North Lanarkshire Council to coordinate communication,
stakeholder engagement and promote the projects as they develop.   
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
A key risk for the City Deal Programme is the current global economic climate and
its short and long term impacts on the delivery of the city deal projects.  This risk is
becoming a live issue for the Programme and will be assessed and recorded within
the City Deal Issues Register. This is not unique to City Deal and the approach to
this risk and issue management will be carried out in conjunction with Finance and
the Glasgow City Region Project Management Office.   
Due to the scale and complexity of the East Airdrie Link Road and Ravenscraig
Access Infrastructure South there is a risk of increased costs as a result of price
inflation and risk to full delivery if the programmes are delayed due to factors such
as technical and stakeholder approvals and land acquisition. 
Risk management of North Lanarkshire’s City Deal activity is incorporated within
the council’s City Deal programme risk register which is reviewed by the City Deal
Manager and reported to the council’s City Deal Board.  The City Deal risks are
also integrated in the Planning and Regeneration Service Risk Register.  Each City
Deal sub project has a detail risk register and is managed by the Project Manager. 
Page 15 of 128

Page 16

5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
A Children’s Rights and Wellbeing Impact Assessment has been carried out for
East Airdrie Link Road due to the interface the project has on Caldervale High
School.  The EALR project team are engaging with Education and the Head
Teacher on the Project. 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☒ No ☐ 
Page 16 of 128

Page 17

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref     Date 15/05/26 
External Funding Report 
From  Pamela Humphries, Chief Officer (Place) 
E-mail Lyndsay Noble, noblely@northlan.gov.uk 
Executive Summary 
This report provides an update to Committee on the council’s recent progress in developing
and securing external funding for physical regeneration projects across North Lanarkshire
including the UK Government’s Pride in Place programme; Scottish Government’s Vacant
and Derelict Land Fund, and heritage funding programmes managed by Historic
Environment Scotland and National Lottery Heritage Fund.  The report also seeks approval 
for the use of the Vacant and Derelict land fund allocation for 2026/27. 
Recommendations 
It is recommended that the Enterprise and Fair Work Committee: 
(1) Acknowledges the update regarding the use of the 2025/26 Vacant & Derelict Land
Fund allocation. 
(2) Approves the proposed use of the Vacant and Derelict Land Fund 2026/27
allocation, to enable the Local Delivery Plan to be submitted for approval to the
Scottish Government. 
(3) Acknowledges the update on progress regarding the approval of the Regeneration
Plan for Coatbridge under the Pride in Place Programme. 
(4) Acknowledges the update regarding the award of Pride in Place programme
funding to Forgewood, North Motherwell and Town Centre. 
(5) Acknowledges the update on the Pride in Place Impact Fund. 
(6) Acknowledges progress with developing the heritage funding bids for the 
Rediscovering Airdrie and Summerlee Museum projects. 
(7) Acknowledges the update on the Scottish Government’s Regeneration Capital
Grant Fund including the successful application from Cairnlea Church, Airdrie. 
(8) Acknowledges the updated position on the Scottish Government’s Place Based
Investment Programme for 2025/26. 
Page 17 of 128

Page 18

1. Background 
1.1 The council aims to secure external funding to support the physical, social and
economic regeneration of North Lanarkshire, to deliver the Plan for North Lanarkshire.   
1.2 There has been significant recent activity across a range of funding streams. This report
provides an update on progress towards securing a range of funds to support the social,
physical and economic regeneration of North Lanarkshire. 
2. Report 
2.1  This report provides an update on current external funding activity, including recent bid
submissions and decisions. 
Vacant and Derelict Land Fund (VDLF) 
2.2  Since 2006, North Lanarkshire Council has received funding through the Scottish
Government’s Vacant and Derelict Land Fund (VDLF) Programme to support the
remediation and re-use of long-term vacant and derelict land sites within North
Lanarkshire. The award of this annual grant is subject to the submission of a VDLF
Local Delivery Plan (LDP) and its approval both by committee and the Scottish
Government.  
2.3  In 2025/26 North Lanarkshire was awarded £1,897,556 from the VDLF and, following
Committee and Scottish Government approval, it was allocated to support development
at Ravenscraig Business Park and Gartcosh Industrial Park.  Phase one of the works
at Ravenscraig is now on site with substantial match funding from the Glasgow City
Region City Deal Infrastructure fund under the Enabling Commercial Space Project
which will support the construction initially of 2 industrial units. The development at
Gartcosh is due to start on site in early 2026/27.  
2.4  In March, the Scottish Government confirmed the Vacant and Derelict Land Fund
allocation to North Lanarkshire for 2026/27 of £2,038,098. It is proposed that this is
allocated to Fusion Assets Ltd to progress works at Ravenscraig Enterprise Park;
Condor Park, Eurocentral and Strathclyde Business Park. An allocation of £250,000 is
also proposed for infrastructure and active travel design works at Ravenscraig south to
improve links to New College Lanarkshire.  
2.5  The works at Ravenscraig will complete enabling and servicing works on a second
phase of development on plot 1 leading to a further 2 industrial units, also to be funded
through the City Deal Enabling Commercial Space Project.  At Condor Park, the VDLF
funding will be used to carry out additional site investigations and gas monitoring ahead
of establishing a joint venture to take forward the overall development on the site. At 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement
(2) Refocus our town centres and communities to be multi-
functional connected places which maximise social, economic, and
environmental opportunities
Programme of Work Transforming Places
Page 18 of 128

Page 19

Strathclyde Business Park site investigation would be carried out, leading to acquisition
and enabling works being taken forward. 
Pride in Place Programme (Formerly Plan for Neighbourhoods)
2.6 As previously reported, it was confirmed in 2024 that Coatbridge had retained the
award of £19.5M over the next 10 years, through the rebranded UK Government Plan
for Neighbourhoods Programme. A further rebranding of this programme has since
been announced and has now become the Pride in Place Programme. Coatbridge
remains one of the towns within Phase 1 of the Pride in Place Programme with the
delivery phase due to commence in 2026/27. 
2.7 The Coatbridge Regeneration Plan and initial 4-year Investment Plan covering the
period 2026/27-2029/30 have now been approved by the UK Government. The Plan
outlines the vision for the town over the next 10 years. This will see an initial funding
allocation of £6.6M awarded to Coatbridge over a first 4-year investment period, to be
invested in projects and initiatives detailed within the Investment Plan and in line with
local priorities identified within the Coatbridge Regeneration Plan.   The funding
allocation for Phase 1 Pride in Place areas is 75% for capital expenditure and 25% for
revenue expenditure. 
2.8 As reported to Committee in February 2026, the UK Government announced an
extension of the Pride in Place Programme. A second neighbourhood within North
Lanarkshire was confirmed within the extended programme known as Phase 2. The
Forgewood, North Motherwell and Motherwell town centre area will receive up to £20
million regeneration funding over the next decade.  The funding allocation for Phase 2
of Pride in Place areas is 63% for capital expenditure and 37% for revenue expenditure.
As with Coatbridge, the council is the accountable body for this funding. 
2.9 Council officers, working with the local MP, have progressed an Expression of Interest
process for the role of the Neighbourhood Board Chair. This process has now
concluded with an independent Neighbourhood Board Chair successfully appointed.
Work is now focussing on forming the Neighbourhood Board. Board membership will
include the local MP, two elected members and a range of other local stakeholders
including community representatives in line with Pride in Place Funding Guidance. 
2.10 Board membership will be confirmed to the UK Government in July 2026 with a Pride
in Place Regeneration and Investment Plan to be developed and submitted by Winter
2026/27. Updates on Phase 2 will be presented to Committee prior to submission to
the UK Government.  The project delivery phase is then scheduled to commence
Spring 2027. 
Pride in Place Impact Fund (PiPIF) 
2.11 The UK Government published guidance on the Pride in Place Impact Fund in
September 2025, identifying 8 local authorities in Scotland, including North
Lanarkshire, to receive £1.5m in capital funding over the period September 2025 to
March 2027. The funding is split over the two financial years with £750,000 allocated
to each year.  Local authorities are expected to work in collaboration with MPs and
other stakeholders in their area to identify the interventions that will deliver the most
benefits to local residents and breathe new life into the areas in which they live. The
funding is to be used to support a range of activities under the following objectives:  
Page 19 of 128

Page 20

• Community spaces: creating, extending, improving or refurbishing existing
community facilities and enabling community organisations to take control or ownership
of underused but valued local assets. 
• Public spaces: enhancing the physical environment in public spaces - examples of
initiatives include new or improved green spaces or public squares, improved outdoor
play, sports and leisure spaces, installing street furniture, public art or wayfinding. 
• High street and town centre revitalisation: making these areas more attractive and
welcoming places where people congregate and which encourage economic activity.
Examples of initiatives that could be funded are shop frontage improvements,
adaptations that bring premises back into use, streetscape improvements, public art,
trails and wayfinding, and creating or improving the infrastructure for regular markets. 
2.12 Due to the limited time to develop and deliver capital projects through this fund, initial
work has focused on eligible activities that are already at an advanced stage of
development and have arisen from engagement with local communities. Importantly,
there has also been scope to reconfigure some projects previously supported through
the Shared Prosperity Fund that meet the criteria for the PiPIF such as community
grants (linking with the Local Development Programme) and business grants to
enhance retail and business units on our high streets.   
2.13 A list of project proposals was previously circulated to all Elected Members and
reported to Policy and Strategy Committee in March 2026.  The following table shows
the distribution of funds planned against the 3 objectives noted above.  Updates on the
projects will be brought back to Committee in due course. 
Sept 2025 - Mar 2026 Apr 2026 to Mar 2027
Community Spaces £35,000 £430,000
Public Spaces £606,000 £140,000
High Streets and Town
Centre Revitalisation £109,000 £180,000
TOTAL £750,000 £750,000 
Rediscovering Airdrie
2.14  In 2023, the council secured £150,000 from Historic Environment Scotland and
National Lottery Heritage Fund to support the ‘development phase’ of ‘Rediscovering
Airdrie’, a heritage-led regeneration project aimed at supporting a range of physical
interventions and community heritage activities in Airdrie town centre.
2.15  The development phase of the project formally commenced in January 2024. A bid for
£1.45m of delivery funding was approved by the National Lottery Heritage Fund in
December 2025. An application has also been submitted to Historic Environment
Scotland seeking a further £1.2m and a decision is awaited on this. Subject to approval,
this external funding of £2.65m will be supported by match funding of £2.375m from
the council’s capital programme.
2.16  If successful, the ‘delivery phase’ will focus on the redevelopment of Airdrie Public
Library, whilst offering a suite of activities for the community related to Airdrie’s
heritage, as well as offering third-party grant schemes for a Shopfront Improvement
Scheme and Repair and Conservation Grants for eligible works within the defined
scheme area.
Page 20 of 128

Page 21

Summerlee Redevelopment 
2.17  ‘New Stories, New Audiences, Better Lives’, a project which aims to redevelop parts of
Summerlee Museum of Scottish Industrial Life and deliver a programme of activities
aimed at engaging new audiences and extending the museum’s collections, secured
£127,000 in ‘development phase’ funding from National Lottery Heritage Fund in 2023.  
2.18  The project formally started in February 2024 with studies undertaken and the
preparation of documentation in support of the full application being developed fully. 
2.19 Due to rising costs, it was necessary to undertake a value engineering exercise prior
to submission of the final application. The full ‘delivery phase’ application, seeking
£3.4m in funding, will now be submitted by May 2026.  The total project cost is £5.6m,
with match funding secured from the Coatbridge Pride in Place programme.
Regeneration Capital Grant Fund (RCGF) / Vacant and Derelict Investment Programme
(VDLIP) 
2.20  The Scottish Government have recently announced that RCGF and VDLIP will be
combined and will continue to be known as the Regeneration Capital Grant Fund
(RCGF). It is intended to maintain this approach going forward for future rounds of the
RCGF. Stage 1 applications were invited to be submitted in June 2025, for projects to
be delivered during 2026/27. 
2.21  North Lanarkshire Council submitted three applications at Stage 1 on behalf of
community organisations for the following projects: Cairnlea Centre well-being hub
(Cairnlea Parish Church, Airdrie); Chapelhall Community Development Group for a
modular build community facility, and Glenboig Community Trust for community
greenspace. The Scottish Government recommended all three projects to proceed to
Stage 2 however the project at Glenboig was unable to progress due to a number of
internal issues for the Group. 
2.22 Final applications for Carinlea and Chapelhall Community Development Group were
submitted by the deadline of 28 November 2025.
2.23 The Scottish Government have recently confirmed that the application for Cairnlea
Church has been successful and will be awarded up to £1.7m of RCGF funding. The
Group have been notified, and officers are currently liaising with the group members
ahead of formally accepting the offer of grant.
2.24 Unfortunately, the application for Chapelhall was unsuccessful.  The Group have been
advised and feedback on their application from the Scottish Government has been
provided.
Place Based Investment Programme (PBIP) 
2.25  The Scottish Government committed to the establishment of a Place Based Investment
Programme (PBIP) allocating £140M to local authorities over 5 years commencing in
2021/22. 
2.26  This Fund has been used to take forward place-based initiatives focused on a range of
key themes including place making; town centre regeneration; 20 minute
neighbourhoods; community led regeneration and ownership; tackling inequalities;
accelerating goals for net zero carbon, and promoting community wealth building. 
Page 21 of 128

Page 22

2.27  The Fund was temporarily paused by the Scottish Government in early 2024. The
council subsequently received funding of £830,000 towards the Strathclyde Park
project. This was however a reduced allocation as an award of £1.698m had been
expected in 2024/25. 
2.28  The Scottish Government previously confirmed the allocation of Place Based
Investment Programme funding for the fifth and final year of the programme. North
Lanarkshire Council had been provisionally allocated £1.698m for 2025/26 and this
was to be awarded in two tranches. The first tranche amounted to £1,329,534 and was
confirmed and received. The Scottish Government have now advised that the second
tranche of £368,466 will not be confirmed and no further monies under PBIP will be
received. There has been no confirmation regarding whether the fund will be continued
or if a successor fund will be announced. 
3. Measures of success 
3.1  The primary measure of success arising from the work and updates outlined in this
report is to maximise external funding for investment in the regeneration of North
Lanarkshire and its places. 
3.2  Future economic and employment benefit gained from the investment of the council’s
allocated VDLF grant awards. 
4. Supporting documentation 
4.1 There are no supporting documents. 
Pamela Humphries 
Chief Officer (Place)   
Page 22 of 128

Page 23

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The various external funding awards and internal match funding is managed by the
Place Service and Finance.   
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 23 of 128

Page 24

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The City Deal and Regeneration team work alongside the Enterprise team within
Place and both have regular engagement with the council’s Corporate
Communications officers to ensure that both community and stakeholder
engagement and press releases announcing funding and project updates are in line
with council and government communication guidance. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
Individual risk registers are developed for any project receiving funding. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 24 of 128

Page 25

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles
from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 25 of 128

Page 26

Page 26 of 128

Page 27

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref   (AG/PK) Date 15/05/26 
Routes to Work Ltd Service Level Agreement 2026/27 
From  Alison Gordon, Chief Social Work Officer (Education, Families, Justice &
Integrated Practice)  
E-mail gordonal@northlan.gov.uk   
1. Background 
Executive Summary 
Routes to Work Ltd, a Council ALEO, delivers several employability programmes funded
by the Council and subject to an annually negotiated SLA (Service Level Agreement) which
specifies targets and expenditure.  Key parts of the Council’s employability programmes
related to supporting unemployed or economically inactive residents are delivered by
Routes to Work Ltd on the Council’s behalf across a range of venues in our communities. 
The current SLA ended in March 2026, and the new SLA is required for the period 2026/27
to ensure continuity of provision in North Lanarkshire’s communities.   Each SLA is
designed to ensure services are adjusted to meet the current challenges in our
communities and the new SLA will support the Council’s aim of delivering an employability
service open to all residents of North Lanarkshire alongside specialist support for those
with additional barriers to work.  Routes to Work Ltd. is the most significant contributor to
the effectiveness of North Lanarkshire Council’s community-based employability
programmes which, as part of The Plan for North Lanarkshire’s, support our residents to
move into fair and sustainable employment. 
Recommendations
It is recommended that Committee: 
(1) Approve the Service Level Agreement with Routes to Work Ltd for 2026/27   
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement
(11) Increase economic opportunities for adults by understanding,
identifying, and addressing the causes of poverty and deprivation and
barriers to financial inclusion
Programme of Work Brighter Futures
Page 27 of 128

Page 28

1.1 Routes to Work, established in 2002, is a company limited by guarantee with charitable
status which is owned by North Lanarkshire Council.  Routes to Work has been
comprehensively reviewed in 2019 and 2024 with the latest review being reported to
the Policy and Strategy Committee on 13 March 2025 where it was agreed that no
change to the external delivery arrangements are needed. 
1.2 Key strengths of the organisation identified in each review were its established brand
and presence within communities and track record of consistently supporting people
into sustainable employment alongside a service which treats residents with dignity
and respect.  The organisation provides a range of free employability services to North
Lanarkshire residents as part of the programmes funded by the Council and specialises
in providing case worker support to unemployed residents, access to vocational
training and the short-term costs associated with moving from benefits to employment,
such as childcare and travel.  They also provide in-work support for up to 6 months for
those participants that require it.   
1.3 Routes to Work Ltd are funded by the Council to play a central role within the
employability landscape in North Lanarkshire in their delivery of services across all
ages as well as in their focus on moving people into employment.  There are a number
of other providers active within North Lanarkshire, and these are managed by the local
employability partnership, chaired by the Council, to work in a manner that avoids
duplication and integrates their services with those of Routes to Work Ltd.   The Council
employability team manage the alignment of these programmes and monitor their
delivery as well as ensuring the overall strategy in line with the Brighter Futures
Programme of Work and The Plan for North Lanarkshire.
2. Report 
2.1 The programmes subject to the SLA in 2025/26 and funded by the Council and external
funders for delivery by Routes to Work were: 
(i) North Lanarkshire’s Working (NLW) – North Lanarkshire wide programme for
all unemployed or underemployed residents offering support to access advice,
training and employment opportunities within local communities.  This was the
third year of a programme jointly funded by the UK Shared Prosperity Fund and
the Council.
(ii) No One Left Behind (NOLB) - support for unemployed 16-19 year olds and
additional support to the Education & Families Pathways Programme for school
leavers to enter a job or training.  This was a single year programme funded by
the Scottish Government.
(iii) Working for Families (WfF) - support targeted at low-income parents across
North Lanarkshire with the long-term aim of increasing families’ incomes from
employment.  This was a single year programme funded by the Scottish
Government.
(iv) Specialist Support – to ensure a real focus on the barriers being highlighted by
clients and other Council services there was an additional focus on securing
jobs for clients who faced either health issues or barriers related to their
involvement with our justice services.  While there are additional targets for
these groups the funding for their support was drawn from the existing
resources allocated to Routes to Work Ltd. within the SLA. 
2.2 2025/26 Performance 
The performance targets and expenditure levels for the 2025/26 programmes have
been the subject of monthly monitoring meetings and quarterly funding reports as well
Page 28 of 128

Page 29

as being reviewed within the six-monthly Performance and Finance reports submitted
to the Enterprise and Fair Work Committee.   
2.3 Final figures for 2025/26 are provided below and table 1 shows the actual performance
against job outcome targets as well as the sustainability of employment, which is
measured after 26 weeks, and table 2 shows expenditure against that agreed within
the SLA.  In the last year increases in employer costs have resulted in business slowing
their recruitment.  However, unemployment in North Lanarkshire remains low and has
dipped below the Scottish average for the first time and this is alongside continued
wage growth for those in work in North Lanarkshire.  Therefore, supporting unemployed
residents into sustained and fair employment remains one of the key routes to tackling
poverty. 
Table 1: Job Outcomes (JO) & % sustained at 26 weeks (%s26)
2025/26
Programmes
Target Actual
JO %s26 JO %s26
NLW  648 70% 750 76%
NOLB 220 70% 250 76%
WFF 224 70% 290 75%
Specialist
Health &
Justice
128 70% 144 58%
Total 1,220 70% 1,434 71% 
Table 2: Expenditure
2025/26
Programmes
SLA
Expenditure
Actual  Variance Funding
Source 
NLW  £3,648,139  £3,376,698  -£271,441
54% NLC
/ 46 %
UKSPF 
NOLB  £697,233  £614,695  -£82,538
100% SG
NOLB 
WFF  £946,295  £933,417  -£12,878 
100% SG
NOLB 
Total  £5,291,667  £4,924,810  -£366,857
37% NLC/
31% SG/
UK 32% 
2.4 In the last year Council funded programmes have exceeded their job outcome targets
though key challenges remain.  One is the sustainability of employment for residents
who have health or justice issues and work is underway to provide additional support
to that group in order to drive up the sustainment in work outcomes.  The other
challenge addressed in 2025/26 was high economic inactivity and a real positive
achievement is that 13% of those on our employability programmes in the last year
who secured employment had been economically inactive with long term health
conditions and/or caring responsibilities.  The aim in 2026/27 is to maintain a focus on
engaging this group with a target of 18 % for the next year.    The underspends across
the programmes has been mainly due to staff turnover and has been recycled into
other employability activities delivered by the Council’s employability team, mainly
increased numbers of paid work placements for parents. 
2.5 Further information on the reach and profile of those supported by the Council’s
investment show that 66% of those supported were parents which has risen from 26%
Page 29 of 128

Page 30

in 2023/24 and 51.4% of those engaged overall were women with 48.6% men.  Further
analysis shows the investment is reaching those residents where the greatest impact
can be made. 27% of those engaged had a long-term health issue and 11% had
disclosed a conviction.  As always, the programmes maintained a higher per person
investment in the priority 16-24 age group with 39.8% of funding going to those young
people and 49.49% of employability clients supported in the last year live in the 20%
least prosperous datazones which also fits with our aspiration to engage those most in
need of our services.  Importantly, the significant increase in supporting the BAME
community has been maintained this year with 11% of clients having a BAME
background.   
2.6 Lastly, the two main barriers identified by unemployed residents on our programmes
have been lack of work experience and childcare.  These are followed by transport,
health, justice issues and caring responsibilities.  Removing these as a barrier to work
accounts for much of the time in preparing people for the workplace and the two main
barriers are straightforward to deal with but need time to be addressed effectively. 
Many local businesses, especially those NL Employer Charter members, have played
a significant role in providing work experience for our service users with the Third
Sector, NHS Lanarkshire and the Council all making high numbers of work experience
opportunities available for our parental employment programmes in the last year.  In
relation to childcare this is high due to the number of parents we support and is often
resolved by Routes to Work case workers liaising with local Council provision or private
providers, with clear and affordable plans put in place to support parents prior to
starting employment.   
2.7 2026/27 Targets and Funding 
The design of the new SLA targets and funding model has been based on the
experience of delivery of the last year and reflects the ambition of the Council to
maintain the high levels of support for unemployed residents, especially young people,
to access the opportunities available in the North Lanarkshire job market.   Sustainable
employment remains one of the key routes out of poverty for unemployed and
economically inactive residents and, while our programmes are open to all residents,
they continue to target those residents who, without our investment, would not secure
employment. In a move toward simplification there are now two distinct programmes
agreed with Routes to Work Ltd to be delivered in 2026/27.  This is undertaken without
losing ground on securing any of the Council’s priorities or those of our external
funders.   
2.8 All Age Employment Support 
The first of these is North Lanarkshire’s Working and offers all-age support (aged 16-
67) to all unemployed and economically inactive residents.  There will be overall targets
within this programme but also reporting targets for our priority groups of young people
as well as those with health and justice issues.   Funding for this programme is
supported by the Council’s core employability budget of £1,675,136 but also attracts
the investment of the Scottish Government No One Left Behind programme with
£697,000 and the UK Local Growth Fund with £500,000.   
2.9 Parental Employment 
The second of these is our Working for Families programme delivered across North
Lanarkshire including that part delivered by Routes to Work Ltd.  This is due to the
sustained level of funding from the Scottish Government to support parental
employment as a mechanism to tackle child poverty.  This funding will mainly support
Page 30 of 128

Page 31

out of work parents but also some employed parents on low incomes.  The Routes to
Work contribution to the parental employment programme is significant and is
integrated with a range of other Working for Families initiatives co-ordinated by the
Working for Families manager within the employability team.  These include paid work
placement programmes within the Council, NHS and third sector as well as services
provided to employability directly by the Tackling Poverty team.  In addition, there is
close working with the Council’s Whole Family Support and Wellbeing team to ensure
our parents get the services they need.  Funding for this programme is supported with
£1,207,530 from the Scottish Government’s latest Tackling Child Poverty Delivery Plan
2026-2031(Bringing Hope, Building Futures). 
2.10 Within the two programmes described above there is support available for every person
of working age in North Lanarkshire who is either economically inactive or unemployed
with additional support for employed parents on low incomes to increase their earnings.
Referrals to programmes continue to come from a range of sources and the North
Lanarkshire’s Working freephone number (0800 0730 226) and email mailbox
(northlanarkshiresworking@northlan.gov.uk) will continue to be managed by the
employability team to direct these to the most appropriate support. 
2.11 Proposed targets are given in Table 3 with a more detailed breakdown of both
programmes into target groups provided in table 4. 
Table 3: Targets 
2026/27
Programmes
SLA Targets
Engaged Qualifications Job
Outcomes
Sustainment
26 weeks
North Lanarkshire’s
Working 
1,250 431 688 70%
Working for Families  843 191 365 70%
Total 2,093 622 1,053 70% 
Table 4: Programme targets breakdown
North
Lanarkshire’s
Working (NLW)
Engaged Job Outcomes Sustainment
26 weeks
NLW Age 25+ 653 380 70%
NLW Age 16-19 226 113 70%
NLW Age 20-24 115 67 70%
NLW Health &
Justice
256 128 70%
Total  1,250 688 70%
Working for
Families (WFF)   
WFF Out of Work 720 324 70%
WFF in Work  123 41 70%
Total 843 365 70% 
2.12 Funding for these programmes is detailed in Table 5 below.  The levels of funding
committed for UK Local Growth Fund are already secured from the UK government
until March 2027 and the Scottish Government Funds are subject to a grant agreement,
valid until March 2027.  Where possible, external funding has been utilised to support
the delivery of employability programmes with 59% of the total coming from external
Page 31 of 128

Page 32

sources and 41% from NLC budgets allocated to match fund employability
programmes.   
Table 5: 2025/26 Proposed funding
2025/26
Programmes
SLA Expenditure Funding Source 
North Lanarkshire’s
Working  £2,897,000  59% NLC / 24% SG/
17% UKG 
Working for Families  £1,200,000  100% SG NOLB 
Total  £4,097,000
41% NLC/ 47% SG/
UK 12% 
2.13 These services funded by the Council and provided by Routes to Work Ltd will play a
major role in ensuring there is employability support available to every unemployed
and underemployed resident of North Lanarkshire and even with shifts in external
funding this remains a large-scale investment in economic inclusion and employability
by the Council and partners.  In addition, through the implementation of its ALEO Action
Plan Routes to Work Ltd is committed to continuing to align its activities with The Plan
for North Lanarkshire and play a full role in supporting the Council achieve its
ambitions.
3. Measures of success
3.1  Routes to Work Ltd continue to make a significant contribution to the Council’s
employability programmes and deliver on job outcomes within the agreed budgets
across North Lanarkshire.   
4. Supporting documentation 
4.1 Appendix 1   Draft Service Level Agreement between North Lanarkshire Council and
Routes to Work Ltd.   
Alison Gordon
Chief Social Work Officer (Education, Families, Justice & Integration)
Page 32 of 128

Page 33

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
All costs associated with the SLA are dictated by the financial parameters agreed
at the outset for the delivery of the Council’s UKSPF projects. Council resources to
match fund this activity are from NLC Match Funding allocated to employability
projects.  Routes to Work operate on a full cost recovery basis which requires that
all costs claimed reflect actual costs incurred and these are 100% verified quarterly
and subject to annual external audit. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
Page 33 of 128

Page 34

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Managing and monitoring service performance supports the ongoing monitoring of
the service’s risk register. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
Within all Council employability programmes veterans are immediately eligible for
support alongside other priority groups. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
Page 34 of 128

Page 35

If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒ 
Page 35 of 128

Page 36

Appendix 1 
Service Level Agreement 
between 
North Lanarkshire Council 
and 
Routes to Work Limited 
for 
(i) North Lanarkshire’s Working 
(ii) Working for Families 
April 2026 - March 2027 
Page 36 of 128

Page 37

CONTENTS 
1 Introduction        Page 3 
2 Definitions        Page 3 
3 Purpose of Agreement       Page 4 
4 Period of Agreement       Page 4 
5 Quality of Service        Page 4 
6 Provider’s Status        Page 4 
7 Payment         Page 4 
8 Variation         Page 4 
9 Fraud         Page 4 
10 Intellectual Property Rights      Page 5 
11 Intellectual Property Rights Indemnity     Page 5 
12 Indemnity and Insurance       Page 5 
13 Equalities and Human Rights                    Page 5 
14 Termination        Page 6 
15 Recovery of Sums Due       Page 6 
16 Confidentiality        Page 6 
17 Assignment and Sub-Contracting     Page 6 
18 Notices         Page 6 
19 Default         Page 7 
20 Dispute Resolution       Page 7 
21 Statutes         Page 8 
22 Governing Law        Page 8 
23 TUPE         Page 8 
24   Force Majeure               Page 8 
25   Employment Practices          Page 8 
26   Environmental Sustainability      Page 8 
Signatories to the Agreement       Page 9
Page 37 of 128

Page 38

Schedule A: Specification       Page 10 
Schedule B: Finance Schedule      Page 19 
Schedule C: Monitoring Schedule      Page 20 
Schedule D: Dispute Resolution Procedure                                                 Page 21 
Schedule E: Service Value and Targets      Page 23 
Page 38 of 128

Page 39

1 INTRODUCTION 
1.1 This Agreement records the arrangement between the Council and the Provider for the provision
of Employability Services in North Lanarkshire in respect of the management and delivery of
the programme North Lanarkshire’s Working and Working for Families programmes.  
1.2 The Agreement sets out the relationship between the Council and the Provider including
respective roles and responsibilities. 
1.3 The Service is funded through a combination of funding as detailed in the Finance Schedule
and the Agreement sets out all the requirements of these funding streams. 
1.4 The Agreement has been formulated within the context of the Council’s decision at a meeting
of the Enterprise & Fair Work Committee on 15 May 2026 to appoint the Provider to perform the
Service. 
1.5 The Agreement will form part of the Council’s approach to developing mechanisms to remove
barriers that clients residing within North Lanarkshire face in accessing employment
opportunities. Targeting people of working age who are not in work, the Agreement aims to
achieve this by developing a structured pathway towards sustainable labour market integration. 
2 DEFINITIONS 
“Agreement” means the contract between the Council and the Provider consisting of this service
level agreement and any other documents, schedules or annexes (or parts thereof) specified in
the Agreement.  
“The Council” means North Lanarkshire Council, a Local Authority created under the Local
Government (Scotland) Act 1994 and is statutory successors whomsoever 
“Equalities Legislation” means the Equalities Act 2010 and all other relevant statutory
obligations in relation to equalities which apply in the UK or the EU equivalent. 
“Force Majeure” means any event or occurrence which is outside the reasonable control of the
party concerned and which is not attributable to any act or failure to take preventative action by
that party, including fire, flood, violent storm, pestilence, explosion, malicious damage, armed
conflict, acts of terrorism, nuclear, biological or chemical warfare or any other disaster, natural
or man-made but excluding (a) any industrial action occurring within the Provider’s organisation;
or (b) the failure by any sub-contractor to perform its obligations under any contract. 
“GDPR” means the Data Protection Act 2018, the General Data Protection Regulation ((EU)
2016/679) and the Privacy and Electronics Communications (ED Directive) Regulations 2003
as such legislation may be amended, updated or replaced with equivalent legislation from time
to time. 
“Intellectual Property Rights” means all patents, trademarks, registered designs (and any
applications for any of the foregoing) copyright (including rights in software – object code and
source code), semi-conductor topography rights, database rights, unregistered design rights,
rights in and to trade names, business names, domain names, product names and logos,
databases, inventions, discoveries, know- how and any other intellectual or industrial property
rights in each and every part of the world together with all applications, renewals, revisals and
extensions. 
“The Provider” means Routes to Work Limited. 
“Service” means the provision of any goods, services, articles or materials which, as the context
of the Agreement so requires, the Provider is obliged to provide to the Council as detailed in the
Specification. 
“Specification” means the description of the Service annexed at Schedule A to the Agreement.
Page 39 of 128

Page 40

“Participant” means the individual recipient of the service provision. 
“Participant Records” means all associated forms and records required relating to the
participants participation in the service provided. 
“CEDR” means the Centre for Effective Dispute Resolution. 
“Minor Breach” means a delay or non-performance by the Provider of their obligations under
the Agreement which does not materially, adversely and substantially affect the execution of
the Agreement. 
“Serious Breach” means any breach or a series of “Minor Breaches” by the Provider of its
obligations under the Agreement which adversely, materially and substantially affects the
execution of the Agreement (or adversely affects the health and safety of staff or Participants);
or a “Minor Breach” of a specific obligation in respect of which the Council has served two
consecutive notices concerning the same or similar circumstances from where the Provider has
failed to remedy that breach. 
The condition and paragraph headings used herein are for purposes of convenience or
reference only and they shall not be used to explain, limit or extend the meaning of any part of
the Agreement. 
The masculine includes the feminine and the singular includes the plural and vice versa unless
the context otherwise requires. 
3 PURPOSE OF AGREEMENT 
3.1 The Agreement is between the Council and the Provider in respect of provision by the Provider
to the Council, of the Service. 
4 PERIOD OF AGREEMENT 
4.1 The Agreement will commence on 1 April 2026 and finish on 31 March 2027. 
4.2  The Council reserves the right, at its sole discretion, to extend the Agreement for a period
beyond the date mentioned in Clause 4.1 above, always under the same terms and conditions
as are specified in the Agreement. 
5 QUALITY OF SERVICE 
5.1 The Service shall comply in all respects with the Agreement or any authorised variation thereto
and shall be completed in a proper manner to the standards of best technical and commercial
practices using competent and appropriately trained staff taking due and diligent care and
attention at all times. 
6 PROVIDER’S STATUS 
6.1 In carrying out the Service, the Provider shall be acting as principal and not as the agent of the
Council.  Accordingly the Provider shall not (and shall procure that his agents and servants do
not) say or do anything that might lead any other person to believe that the Provider is acting
as the agent of the Council. 
7 PAYMENT 
7.1 The Council shall meet the costs of invoices which it accepts as accurate and pertinent to the
provision by the Provider of the Service under the Agreement. The Provider shall be obliged to
comply with all terms and conditions contained in Schedule B of the Agreement, and with all
other obligations contained in the Agreement, prior to being entitled to any payment by the
Council in respect of the Service carried out under the Agreement. 
8 VARIATION
Page 40 of 128

Page 41

8.1 The terms of the Agreement shall not be amended, modified or varied in any way whatsoever,
other than by a written minute of variation between the parties. 
9 FRAUD 
9.1 The Provider shall use their best endeavours to safeguard the Council’s funding of the Service
against fraud generally and, in particular, fraud on the part of the Provider's directors, employees
or sub-contractors. The Provider shall pay the utmost regard to safeguarding public funds
against misleading claims for payment and shall notify the Council immediately if they have
reason to suspect that any irregularity or fraud has occurred or is occurring. 
9.2 The Provider shall co-operate with the Council and assist in the identification of Participants
who may be unlawfully claiming state benefits.  The Council may from time to time brief the
Provider as to the co-operation and assistance it reasonably requires including the provision of
information regarding fraud by Participants.  On receipt of the information, further evidence may
be collected by the Council or other department, office or agency of Her Majesty’s Government
with a view to prosecution. 
9.3 Any act of fraud committed by the Provider (whether under the Agreement or any other contract
with the Council) shall entitle the Council to terminate the Agreement, and any other contract
the Council has with the Provider, by written notice to the Provider. 
10 INTELLECTUAL PROPERTY RIGHTS 
10.1 The Council and the Provider acknowledge that all Intellectual Property Rights owned by each
other at the date of the Agreement shall remain so owned. 
10.2 Except to the extent that the Agreement is carried out in accordance with designs furnished by
the Council, no part of the Agreement will infringe any patent, trade mark, registered design,
copyright or other rights in the nature of intellectual property of any third party and the Provider
shall indemnify the Council against all actions, suits, claims, demands, losses, charges, costs
and expenses which the Council may suffer or incur as a result of or in connection with any
breach of this condition. 
10.2 All rights (including ownership and copyright) in any specifications, instructions, plans, drawings,
patterns, models, designs or other material furnished to or commissioned by the Council or
made available to the Provider by the Council shall remain vested in the Council and the
Provider shall not (except to the extent necessary for the performance of the Agreement) without
prior written consent of the Provider use or disclose any such specification, plan, drawing,
pattern, model, design or information or other materials (whether or not relevant to the
Agreement) which the Provider may obtain in the performance of  the Agreement. 
10.3 All inventions, designs, methods, processes, data and software discovered or generated as a
result of or in the course of the Agreement and all intellectual property rights therein and in
anything produced in the course of the performance of the Agreement shall belong to the
Council and the Provider agrees to assign the same to the Council without cost. 
11 INTELLECTUAL PROPERTY RIGHTS INDEMNITY 
11.1 The Provider shall indemnify the Council against all claims, demands, actions, costs, (including
legal costs and disbursements on a solicitor and client basis), and losses arising from or incurred
by reason of any infringement or alleged infringement in the UK of any Intellectual Property
Right in connection with execution of the Agreement by the Provider. 
11.2 The Provider shall promptly notify the Council if any claim or demand is made or action brought
against the Provider for infringement or alleged infringement of any third party Intellectual
Property Rights which may affect the execution of the Agreement. 
12 INDEMNITY AND INSURANCE 
12.1 Without prejudice to any rights or remedies of the Council (including but not limited to the
Council’s rights under clause 19 hereof) the Provider shall indemnify the Council against all
Page 41 of 128

Page 42

suits, actions, claims, demands, losses, charges, costs and expenses which the Council may
suffer or incur as a result of or in connection with any damage to property or in respect of any
injury (whether fatal or otherwise) to any person which may result directly or indirectly from any
defect in the Service or any negligent or wrongful act or omission of the Provider. 
12.2 The Provider shall effect (and shall ensure that any sub-contractor shall effect) with a reputable
insurance company a policy or policies of insurance covering all matters which are the subject
of indemnities under the Agreement including Public Liability insurance to a minimum sum of
£5,000,000 and Employers Liability insurance to a minimum sum of £10,000,000 in each case
in respect of any one incident and unlimited to the number of incidents unless otherwise agreed
by the Council in writing. 
12.3 At the request of the Council, the Provider shall produce within forty-eight (48) hours, the policy
or policies required under clause 12.2 together with receipts or other evidence of payment of
the latest premium due thereunder. 
13 EQUALITIES LEGISLATION 
13.1 The Provider shall not unlawfully discriminate within the meaning and scope of the provisions
of the Equalities Legislation. The Provider shall take all reasonable steps to secure the
observance of the Equalities Legislation by all servants, employees or agents of the Provider
and all sub-contractors employed in the execution of the Agreement. The Provider shall at all
times comply with the requirements of the Human Rights Act 1998 insofar as they are carrying
out a function for the Council.  The Provider will indemnify the Council against any and all claims
which may be made against the Council due to the breach of the Equalities Legislation and/or
Human Rights Act 1998 which is caused by or arises out of the Agreement or any actions or
omissions of the Provider. 
14 TERMINATION 
14.1 The Agreement may be cancelled or suspended at any time by the Council giving the Provider
28 calendar days notice.  The Council shall meet all outstanding invoices due to the Provider in
respect of the Service at the time of termination, provided that the Council has accepted those
invoices as valid, relevant and pertinent to the Service to be provided by the Provider under the
Agreement. 
14.2 Without prejudice to any other rights or remedies of the Council, the Council shall have the right
forthwith to terminate the Agreement by written notice if the Provider (if a company) shall have
an administrator or receiver appointed or shall go into liquidation (other than for the purposes of
reconstruction or amalgamation) or (if an individual) be declared bankrupt under the provisions
of the Bankruptcy (Scotland) Act 1985. 
15 RECOVERY OF SUMS DUE 
15.1 Wherever under the Agreement any sum of money is recoverable from or payable by the
Provider, that sum may be deducted from any sum then due, or which at any later time may
become due, to the Provider under the Agreement or under any other agreement or contract
which the Provider holds or previously held with the Council. 
16 CONFIDENTIALITY 
16.1 The Agreement and the subject matter thereof and any information supplied by the Council and
relating in any way to the Council’s business, processes, research or property shall be used for
the exclusive purpose of performing the Agreement and be treated as and kept confidential by
the Provider who shall not disclose it or any details thereof for any purpose whatsoever without
the Council’s prior written consent. 
16.2 As a Scottish public authority, the Council is bound by the provisions of the Freedom of
Information (Scotland) Act 2002.  All information submitted to the Council may therefore need
to be disclosed and/or published by the Council in compliance with the Act (the decision of the
Council in the interpretation thereof shall be final and conclusive in any dispute, difference or
question arising in respect of disclosure under its terms), and any other law, or, as a
Page 42 of 128

Page 43

consequence of judicial order, or order by any court, tribunal or body with the authority to order
disclosure (including the Scottish Information Commissioner). 
16.3 The Provider will comply with the requirements of the GDPR which shall include, but not be
limited to, the provision and maintenance of technical and security arrangements for processing
personal data and the provision of assistance to the Council when they are dealing with subject
access requests.  The Provider shall ensure that any sub-contractors shall comply with the
requirements of the GDPR. 
17 ASSIGNMENT AND SUB-CONTRACTING 
17.1 The Provider shall not assign or sub-contract any portion of the Agreement without the prior
written consent of the Council, the granting of such consent being at the Council’s sole
discretion. Sub-contracting any part of the Agreement shall not relieve the Provider of any
obligation or duty attributable to them under the Agreement. The Council shall reserve in all
instances the right to refuse consent to the Provider assigning, sub-contracting or alienating in
any manner howsoever (including but not limited to the situation where the Provider enters into
the ownership of a third party) any of its rights and/or obligations under this Agreement to a third
party. 
18 NOTICES     
18.1 Any notice given under or pursuant to the Agreement may be sent by hand or by post or by
registered post or by the recorded delivery service or transmitted by telex, telemessage
facsimile transmission or other means of telecommunication resulting in the receipt of a written
communication in permanent form and if so sent or transmitted to the address of one party by
the other party, shall be deemed effectively given on the day when in the ordinary course of the
means of transmission it would first be received by the addressee in normal business hours. 
19 DEFAULT 
19.1 The parties acknowledge and agree that the Agreement is to be provided in the spirit of co-
operation. Each party shall do all things reasonably necessary to co-operate, aid and assist the
other in its performance of its obligations under the Agreement. 
19.2 Any one instance of failure by the Provider to meet any general or specific performance targets
set shall constitute “Minor Breach” whilst repeated or continual failure to meet such performance
targets shall constitute “Serious Breach”. 
19.3 In the event of a “Minor Breach” the Council will adopt the following procedure: 
19.3.1 The Council shall serve 1notice on the Provider specifying that it is a formal warning
notice and giving reasonable details of the breach sufficient for the Provider to identify
the breach.  Within five (5) working days of receipt of such notification, the Provider
shall meet with the Council to discuss why the breach has occurred and how it will be
remedied. The Provider shall have a reasonable period (such period to be mutually
agreed, and in the absence of mutual agreement, to be no longer than twenty-eight (28)
calendar days) following such meeting to remedy the breach. Notwithstanding any other
remedy under the Agreement, the Council shall be entitled to require the Provider to
promptly re-perform or replace the relevant part of the Agreement without additional
charge to the Council. 
19.4 In the event of a “Serious Breach”, the Parties shall adopt the following procedure: 
19.4.1 the Council shall serve written notice on the Provider giving reasonable details of the
breach sufficient for the Provider to identify the breach and requiring the Provider to
meet with the Council forthwith. Upon receiving notification, the Provider shall meet with
the Council forthwith to determine and agree in good faith and acting reasonably
whether a contingency plan is available to deal with the “Serious Breach”.
In the event that a contingency plan is activated, the Provider shall reimburse the
Council in respect of any costs incurred by the Council in activating the same (as set
Page 43 of 128

Page 44

out in the contingency plan) provided that the Council shall do all things to mitigate such
costs including by using the resources of the Provider as appropriate.  In the event that
a contingency plan is not available the Provider shall within five (5) Working Days
provide to the Council a plan, which to the Council's reasonable satisfaction, will when
implemented resolve the breach or remedy the breach itself. 
19.5 In the event that the Provider fails to meet any required action in a contingency plan or a
contingency plan is not available and the Provider does not present a satisfactory alternative
plan, the Council shall be entitled, at its discretion, to serve twenty-eight (28) calendar days’
notice on the Provider of its intention to terminate the Agreement. 
19.6 For so long as and to the extent that the required action is taken which prevents the Provider
from executing the Agreement, the Provider shall be relieved of their obligations under the
Agreement and in respect of the period in which the Council is taking the required action, the
Council shall be entitled to deduct from any sums due to the Provider under the Agreement, an
amount equal to the Council' reasonable costs in taking the required action (including where
relevant the costs of any sub-contractors), provided that the Council shall do all things to
mitigate such costs including by using the resources of the Provider (in each case as
appropriate). 
19.7 The Council shall at its discretion be entitled to continue the required action until the breach has
been remedied and the Provider has demonstrated to the Council's reasonable satisfaction that
it can execute the Agreement without a material probability of repeating the breach. 
20 DISPUTE RESOLUTION   
20.1 In the event of any dispute or event of default under the Agreement, arising between the Council
and the Provider which cannot be resolved directly by them, the issue in dispute will be referred
for dispute resolution in accordance with the Dispute Resolution Procedure outlined in Schedule
D herein. 
21 STATUTES 
21.1 The Provider warrants that at all times in the performance of the Agreement they shall comply
with all statutory requirements and obligations.  All references to Statutes shall include future
amendments and re-enactments of the same. 
22 GOVERNING LAW 
22.1 The Agreement shall be governed by and construed in accordance with Scots Law and the
Provider hereby irrevocably submits to the jurisdiction of the Scottish courts.  The submission
to such jurisdiction shall not (and shall not be construed so as to) limit the right of the Council to
take proceedings against the Provider in any other court of competent jurisdiction, nor shall the
taking of proceedings in any one or more jurisdictions preclude the taking of proceedings in any
other jurisdiction, whether concurrently or not. 
23 TRANSFER OF UNDERTAKINGS (PROTECTION OF EMPLOYMENT) 2006 : TUPE 
23.1 Upon termination of this Agreement TUPE 2006 Regulations may or may not apply in such
circumstances that the Service being provided continues (in part or whole) by another service
provider.  In such circumstances the Provider is expected to fully cooperate and provide the
necessary information to ensure full compliance with TUPE Regulations. 
24. FORCE MAJEURE 
No parties shall be liable to the other party for any delay in performing or failing to perform its
obligations under the Agreement (other than a payment of money) to the extent that such delay
or failure is a result of a Force Majeure event. 
Page 44 of 128

Page 45

Notwithstanding the foregoing, each party shall use all reasonable endeavours to continue to
perform its obligations under the Agreement for the duration of such Force Majeure event. 
However if such Force Majeure event prevents either party from performing its material
obligations under the Agreement for a period in excess of six months either party may terminate
the Agreement with immediate effect by notice in writing. 
Any failure or delay by the Provider in performing its obligations under the Agreement which
results from any failure or delivery by an agent, sub-contractor or supplier shall be regarded as
due to Force Majeure only if that agent, sub-contractor or supplier is itself impeded by Force
Majeure from complying with an obligation to the Provider. 
If any Party becomes aware of a Force Majeure event which gives rise to or is likely to give rise
to any failure or delay on its part it shall immediately notify the other party by the most
expeditious method then available and shall inform the other of the period for which it is
estimated that such failure or delay shall continue. 
25 EMPLOYMENT PRACTICES 
The Provider will issue that it takes a positive approach to fair working practices for employees
(including any agents or sub-contractor employees) or part of a fair and equitable employment
and reward practice which includes but is not limited to a fair and equal pay policy that includes
a commitment to supporting the Living Wage, clear management responsibility to nurture talent
and help individuals fulfil their potential, promoting equality of opportunity and developing a
workforce which reflects the population of Scotland in terms of characteristics such as age,
gender, religion or belief, sexual orientation and disability, support for learning and development,
stability of employment and hours of work, avoiding exploitative employment practices, support
for flexible working, family friendly working and wider work life balance and support for
progressive workforce engagement. 
26 ENVIRONMENTAL SUSTAINABILITY 
The Provider will ensure that its operations and activities are undertaken in a manner that
minimises adverse impacts to the local and global environment.  It will monitor and minimise its
energy use and associated emissions, reduce its use of raw materials and increase the re-use
and recycling of waste.  In particular it will work with customers and employees to maximise the
use of active travel and public transport, work with partners to provide suitable cycling and
electric charging infrastructure and ensure that a full range of waste recycling options are
provided. 
Page 45 of 128

Page 46

SIGNATORIES TO THE AGREEMENT 
For and behalf of North Lanarkshire Council 
Name   
Signature 
Designation 
Address 
Date   
For and behalf of Routes to Work Limited 
Name   
Signature 
Designation 
Address 
Date   
Page 46 of 128

Page 47

SCHEDULE A 
SPECIFICATION 
1 SPECIFICATION NORTH LANARKSHIRE’S WORKING AND WORKING FOR
FAMILIES 
1.1 North Lanarkshire’s Working is valued as follows and will deliver all-age
employability programmes across all communities, and these will be targeted on
economically inactive and unemployed residents who face barriers to entering or
progressing in the labour market: 
Eligible £2,897,000
Total £2,897,000 
North Lanarkshire’s Working has outcomes detailed below with a 70% sustainment
target on job entries at 26 weeks. North Lanarkshire’s Working - All Age Service 
2026/27
Programmes
SLA Targets
Engaged Qualifications Job
Outcomes
Sustainment
26 weeks
North Lanarkshire’s
Working 
1,250 431 688 70% 
North
Lanarkshire’s
Working (NLW)
Engaged Job Outcomes Sustainment
26 weeks
NLW Age 25+ 653 380 70%
NLW Age 16-19 226 113 70%
NLW Age 20-24 115 67 70%
NLW Health &
Justice
256 128 70%
Total  1,250 688 70% 
1.2 Working for Families is valued as follows in terms of costs eligible for No One Left
Behind Grant and will provide support for unemployed/ underemployed low-income
parents in North Lanarkshire: 
Eligible £1,200,000
Total £1,200,000 
Working for Families outcomes detailed below with a 70% sustainment target on job
entries at 26 weeks. 
2026/27
Programmes
SLA Targets
Engaged Qualifications Job
Outcomes
Sustainment
26 weeks
Working for Families  843 191 365 70%
Total 2,093 622 1,053 70% 
Page 47 of 128

Page 48

Working for
Families (WFF)
Engaged Job Outcomes Sustainment
26 weeks
WFF Out of Work 720 324 70%
WFF in Work  123 41 70%
Total 843 365 70% 
1.3 In addition to the above performance, additional outcomes for clients with health and
justice barriers are included as below: 
North
Lanarkshire’s
Working (NLW)
Engaged Job Outcomes Sustainment
26 weeks
NLW Health &
Justice
256 128 70%
Total  256 128 70% 
2 FINANCIAL APPRAISAL AND MONITORING 
2.1 The primary purpose of Financial Appraisal and Monitoring (FAM) is to provide the
Council with an assurance that payments to the Provider are in accordance with
Council requirements that public funds are protected and that value for money has
been obtained. 
2.2 Planning of FAM visits to the Provider shall take account of the materiality and the
assessment of the risk attached to the delivery of the provision. The assessment of risk
shall follow an evaluation of the key, relevant systems adopted by the Provider,
supported by the results of testing undertaken. 
2.3 The Provider shall have systems in place to: 
(a) detect and prevent duplicate claims; 
(b) prepare and submit accurate, valid, supported, timely claims; 
(c) monitor, record and manage lateness and all absences; 
(d) support claims for on-programme-payments through an effective attendance
recording procedure; 
(e) ensure that all the required evidence is collected (and submitted, where
appropriate) to support the claim; 
(f) identify Participants who have left the Programme (“Leavers”) early to prevent
over claiming; 
(g) carry out effective monitoring of sub-contractors; 
(h) respond to FAM reports with an appropriate action plan. 
2.4 The Council’s funding for the Service as detailed in the Agreement will be allocated to
the Provider according to the Finance Schedule contained in Schedule B herein. 
Amendments to planned expenditure must be approved by the Council. This process
will involve the submission of a written statement outlining why planned expenditure
needs to be realigned and a revised budgetary projection/forecast for the duration of
Page 48 of 128

Page 49

the Agreement. If the written submission is authorised by the Council then the Council
retain the right to review this at any given time. 
2.5 On completion of the Agreement all records, created by the Provider in the furtherance
of its obligations under the Agreement, will become the property of the Council.  A final
monitoring visit will be arranged which will finalise all records and ensure that they are
arranged in a suitable fashion  On receipt of a satisfactory final claim audit report all
records will be transferred to the Council. 
2.6 In the event the Council or external auditors identify that any expenditure claimed by
the Provider is ineligible, or that inadequate records of proof of additionality are
available and repayment of any external funds are due, or if repayment of funds is due
for any other reason resulting from the actions/inaction of the Provider, then the
Provider shall repay any funding already received, or appropriate part thereof, within
thirty (30) working days of written demand from the Council. 
2.7 Any expenditure deemed ineligible through any reasonable culpability on the part of
the Provider shall not be met by the Council. 
2.8 In the event that the Council terminates the Agreement under Clause 14 of this
Agreement, and such termination was taken as a result of the Provider’s having
committed a Serious Breach then the Provider shall meet any costs incurred by the
Council relating to the termination of the Agreement, and the process involved in
selecting an alternative provider. Such costs include, but are not limited to, the loss of
external funding by the Council and the loss of money endured by the Council , such
money having been received by the Provider but unused, in the reasonable opinion of
the Council, in the furtherance of the Service under this Agreement. The Provider shall
be obliged to meet these costs within thirty (30) working days of written demand for the
same from the Council. 
2.9 The Provider must produce accurate and regular financial reports as requested by the
Council in performance of the Service. 
2.10 Without prejudice to its obligations under this Agreement, The Provider shall have the
following management obligations: 
(a) Responsibility for advertising, promoting and publicising the Service, subject to
the conditions outlined in section 9 of this Agreement; 
(b) Responsibility for submitting a robust “Performance Management Framework”
that adheres to quality standards requested by the Council; 
(c) Responsibility for the further development of innovative mechanisms and
systems designed to effectively engage with the client group; 
(d) Responsibility for maintenance of systems, which will enable client profiles and
needs analysis to be completed for each client contact and intervention; 
(e) Responsibility for all administration and record keeping and financial
management relating to all aspects of the Agreement; 
(f) Responsibility for the monitoring of Service delivery progress and co-ordination
of all other related Service delivery; 
Page 49 of 128

Page 50

(g) Responsibility for compiling quarterly written reports, detailing Service delivery
progress in comparison to pre-determined targets. This timescale may be
reviewed should the Provider not meet specified targets and outputs; 
(h) Responsibility for ensuring prompt action to highlight any areas of concern in
Service delivery. Failure to do this may result in a breach of contract and the
introduction of performance management measures; and 
(i) Responsibility for Service delivery evaluation and end of year report. This may
also involve engaging with external stakeholders and organisations working on
behalf of the Council. 
3 MONITORING THE SERVICE 
3.1 The Council will use the Hanlon system as part of its monitoring procedures, therefore
it is expected that the Provider will maintain up-to-date and accurate participant records
on the system. 
3.2 All Participants will be made aware of the mandatory need for programme monitoring
and that they may be asked from time to time to participate in consultations. The
Council will provide a minimum of five (5) days notice for any notified visit. Should this
date not be suitable the Provider must inform the Council within two (2) working days
to schedule a new visit. Failure to adhere to this will result in a breach of the Agreement. 
3.3 The Council reserves the right to monitor and review any Participant Records. 
3.4 All performance indicators, customer tracking information, customer feedback,
customer complaints and compliments, and monitoring information will be fed back to
the Council by the Provider through the monitoring reports. 
3.5 The Council reserves the right to review monitoring and evaluation process
arrangements should the management information requirements of the Council
change. 
3.6 The Provider shall allow access by external auditors to all project records under
notification by the Council, assuming no conflict with the GDPR. 
3.7 The Council may also appoint an external consultant to participate in the monitoring
and evaluation of the Provider’s performance and the Provider will co-operate with such
consultants and take all reasonable and necessary steps to implement
recommendations made. 
3.8 The Council reserves the right to introduce bespoke management information systems
that allow the Provider to capture consistent and complimentary information. 
4 PERFORMANCE MANAGEMENT AND QUALITY 
4.1 The Provider shall work with the Council to establish and maintain an effective and
beneficial working relationship and to ensure the Agreement is delivered to the
standard specified in the Agreement. 
4.2 The Provider shall work with the Council to establish suitable administrative
arrangements for the effective management and performance monitoring of the
Agreement. 
Page 50 of 128

Page 51

4.3 The Provider will be responsible for managing and reporting on any sub-contractual
arrangements. Arrangements shall include mechanisms for the provision of
management information, feedback to and from employers and Participants, change
control procedures and the prompt resolution of any problems. 
4.4 The Council will agree with the Provider day-to-day relationship management, contact
points, communication flows and escalation procedures.  Roles and responsibilities will
be documented and the personnel involved in managing the relationship identified and
suitably empowered. 
4.5 The Provider will be expected to continuously improve the quality of the Service
including that delivered via sub-contract.  Where quality falls below acceptable levels
the Provider will be expected to have suitable escalation procedures in place and, in
respect of sub-contracted parts of the Service, take action where necessary to replace
those sub-contractors or assignees whose performance is unsatisfactory. 
4.6 The Council will regularly monitor the Provider’s performance at least monthly. Every
three (3) to six (6) months (or any other period to be notified as appropriate) the Council
will undertake a contractual review as specified in the Monitoring Schedule detailed in
Schedule C herein. 
4.7 Results of any reviews undertaken by the Council in relation to the Service will be
communicated to the Provider. The Provider will be expected to provide any additional
management information required by the Council to facilitate this process and arrange
where necessary access to any of their delivery locations, including those operated via
sub-contract. 
4.8 The purpose of the performance reviews is to encourage an open and regular dialogue
between the parties with the purpose of ensuring that the Agreement is being delivered
appropriately and to drive up performance and quality.  The reviews will encourage the
parties to review performance, discuss opportunities for continuous improvement and
raise and address any complaints or persistent problems encountered with the
Agreement.  Where issues cannot be immediately addressed, the Council and the
Provider will follow the Dispute Resolution Process detailed in Schedule D herein. 
4.9 The regular meetings between the Council and the Provider shall also cover, as
appropriate, resolving disputes and/or dealing with contractual breaches in accordance
with the terms and conditions of the Agreement. 
4.10 The Council shall monitor and review the performance and quality of the Provider
against set standards (see below) and within the overall contract management
approach as detailed above.  Additionally, the Provider may be subject to external
inspection by the Scottish Government and Audit Scotland. The Provider will be
expected to make any additional management information available to these
organisations and provide where necessary access to premises, including sub
contracted locations, as appropriate. 
5 ACCESS TO SUPPORTING EVIDENCE 
5.1 In line with the guidance for the UK LGF and SG NOLB Verification and Compliance
checks, the following is essential in the Agreement between the Council and the
Provider.  The Council has overall responsibility to manage the Agreement and to
ensure: 
Page 51 of 128

Page 52

(a) practical application and effectiveness of the management and control systems
for the Agreement; 
(b) compliance with external funding requirements legislation and with other
external funding conditions of grant; 
(c) that the performance of the Agreement is consistent with the Specification; 
(d) that the expenditure charged against the Agreement and subsequently claimed
has actually been paid out; 
(e) that the expenditure charged against the Agreement and subsequently claimed
is in line with the financial agreement and expenditure claimed is relevant to the
Agreement; 
(f) that the expenditure charged against the Agreement and subsequently claimed
is an item listed in the Payment Schedule detailed at Schedule C of the
Agreement and was incurred against activity delivered during the period
approved; 
(g) that the appropriate national co-financing has in fact been made available; 
(h) that there exists a full transparent audit trail which includes retention of
supporting documentation; 
(i) that all receipts which may have arisen under the Agreement are also taken into
account. 
6 DOCUMENT RETENTION AND RECORDS MANAGEMENT 
The Council is bound by the provisions of the Public Records (Scotland) Act 2011. In
terms of this legislation all public records managed by the Council must be managed
in accordance with the Records Management Plan (RMP) approved by the Keeper of
the Records of Scotland. 
The RMP and the guidance issued by the Keeper indicates that records created by the
Provider are also considered as “public records” under Section 3(1) of the Public
Records (Scotland) Act 2011 and must be appropriately managed during their
operational lifetime. 
6.1 The Provider warrants that: 
6.1.1 they have the capacity to store and retain all supporting documentation and that
they have efficient document retrieval systems in place until the specified
retention date; and 
6.1.2 that no supporting documentation shall be destroyed prior to the specified
retention date. 
6.2 The Provider will provide the Council with access to all supporting documentation under
the Agreement throughout its period and this shall apply even in the event that the
Agreement cannot be completed for whatever reason. 
6.3 The Council is responsible for ensuring that all project documentation retention date
(to be confirmed) is complied with.  Therefore the Provider will fully co-operate with the
Page 52 of 128

Page 53

Council in providing all appropriate documentation at all specified periods and to ensure
direct and immediate communication with the Council in the event of any issues relating
to documentation and/or documentation retention until specified date.  The Provider is
responsible for document retention of any third party information relating to the funded
projects (e.g. information held at any external organisations). 
6.4 In the event of dissolution of the Provider, the Provider will allow the Council access to
all appropriate project documentation.  The Provider agrees that in the event of their
dissolution they still have a responsibility to assist the Council in maintaining a clear
audit trail to all defrayed expenditure (i.e. access to company BACS, bank statements,
staffing payments invoices etc.) 
6.5 In the event that the Provider does not allow or enable access under Condition 6.2
above the Council will withhold any further payments to the Provider and will not be
liable for payment of issued invoices. 
7 HEALTH & SAFETY 
7.1 The Provider shall provide the Council with written details of their health & safety policy,
health and safety procedures, accident reporting and investigation procedures,
arrangements for the safe removal of dangerous substances and wastes and
arrangements for governing specific requirements to demonstrate safe working
practices under the Management of Health and Safety at Work Regulations 1992 and
the like. 
7.2 The Provider must further be able to demonstrate to the Council their arrangements
and those of their sub-contractors under the Health and Safety (Display Screen
Equipment) Regulations 1992, the Supply of Machinery (Safety) Regulations 1992, the
electromagnetic Compatibility Regulations 1992 and all relevant Acts of Parliament,
Regulations and other sources of Law pertaining to health and safety and have records
of same. The Provider must have at least one (1) designated health and safety officer
who has responsibility for all health and safety matters. 
7.3 The Council’s standards for Security and Health & Safety must be adhered to by the
Provider. 
7.4 Health and Safety is the responsibility of the Provider and they shall take out adequate
insurance to cover any possible liabilities. 
7.5 Health and Safety checks may be conducted by relevant representatives of the Council
during the Agreement. 
7.6 Without prejudice to any statutory duty of any person to report any death, injury, case
of disease or dangerous occurrence, the Provider shall inform the Council: 
7.6.1 immediately if any Participant dies or suffers any major injury or case of disease
falling within the scope of any regulations dealing with reporting of accidents at
work or cases of occupational diseases, should the occurrence take place in
the premises of Routes to Work or in any premises if the Participant is on a
work related placement activity. 
7.6.2 as soon as possible, but no longer than seven (7) days after the relevant
accident, of any other accident resulting in a participant being absent from the
programme of training for four (4) days or more resulting in any loss of physical
or mental capacity (including disfigurement).
Page 53 of 128

Page 54

7.7 The Provider shall ensure that there is a current fire certificate for all and any of its
premises which require one, and to provide evidence of the existence of the
aforementioned certificate to the Council on request. 
7.8 Where appropriate, it is the responsibility of the Provider to certify that any necessary
and relevant level of disclosure checks have been carried out under Disclosure
Scotland where clients may be working with vulnerable people, and that any / all
premises are properly registered. 
7.9 The Council’s representatives visit the Provider and their sub-contractors for a variety
of reasons. In the course of their normal duties the Council representatives shall adopt
an ‘eyes and ears' approach to monitoring health and safety.  In doing this the Council
representatives shall not be conducting a health and safety inspection, nor shall they
be in a position to offer advice on whether something is safe or not, instead they shall
approach this from the position of any lay person.  If however a Council representative
does notice something on which they require assurance or clarification, they shall raise
this with the Provider or the Provider’s sub-contractor at the location where they are
visiting. At no time shall the Council representatives be seen as offering professional
advice on health and safety matters and as such, shall not be liable for any advice or
comments or otherwise given to the Provider or their sub-contractor or any omission to
give such advice, comments or otherwise. 
8 SMOKING POLICY 
8.1 The Provider shall not allow the smoking of cigarettes on “No-Smoking Premises”,
within the meaning of the Smoking, Health Care and Social Work (Scotland) Act 2005 
Additionally all employees must respect any rules in force from time to time issued by
the Council within premises used to deliver outreach services. 
9 MARKETING 
9.1 The Provider will consult with the Council at the project conception stage, to identify
level of marketing support required. 
9.2 The Council will prepare a marketing brief based on this early discussion, outlining an
appropriate way forward. 
9.3 The Provider will liaise with the Council in the production of a marketing plan and its
implementation. 
9.4 The Council will provide ongoing marketing support and oversee the production of all
promotional materials. 
9.5 All marketing materials will acknowledge funding bodies as directed by the Council. 
10 STAFF QUALIFICATIONS AND DEVELOPMENT 
10.1 To ensure quality provision it is essential that staff training and expertise are given high
priority.  Therefore the following requirements must be met: 
10.1.1 Staff must hold relevant qualifications and have opportunities to attend relevant
courses. 
Page 54 of 128

Page 55

10.1.2 A personal training development plan must be maintained for all staff, including
a record of all courses attended; 
11 CO-OPERATION WITH RESEARCH INITIATIVES 
11.1 The Provider must co-operate with any research initiative authorised by the Council
including the provision of information about the Agreement.  
Page 55 of 128

Page 56

SCHEDULE B 
FINANCE SCHEDULE April 2026 - March 2027 
North Lanarkshire’s Working 
Eligible £2,897,000
Total £2,897,000 
Working for Families 
Eligible £1,200,000
Total £1,200,000 
Total SLA Project costs: £4,097,000 
Page 56 of 128

Page 57

SCHEDULE C
MONITORING SCHEDULE 
1. North Lanarkshire’s Working, Working for Families and Additional Health &
Justice April 2026 - March 2027 
Expected Outputs & Outcomes 
Outputs and Outcomes  As detailed in Schedule A at 1.1, 1.2, 1.3,
and 1.4 
Employment sustained at 26 weeks  70% 
Monitoring Schedule  Date of Visits 
April 2026 – March 2027  June 2026/ Sep 2026/ Dec 2026/ Mar 2027                
Payment Schedule 
Payment Type Detail Calculation
Advance payment 25%  Paid in April or when SLA
agreed - cashflow
£1,024,250
Actual Expenditure April – June 2026 July claim
Actual Expenditure July – September 2026 October claim
Actual Expenditure October- December 2026 January claim 
Actual Expenditure January – March 2027 Claimed in April (less 50% of
advance) 
SCHEDULE D
Page 57 of 128

Page 58

DISPUTE RESOLUTION PROCEDURE 
STAGE 1 – INFORMATION EXCHANGE
In the event of any dispute arising between the parties in connection with the Agreement the
party bringing the complaint, will write to the other party setting out full details of the dispute
and any proposals for resolving the dispute (the "Letter of Dispute").  The Letter of Dispute
should provide all the necessary details and any supporting documentation to enable the other
party to fully consider the dispute. 
The party which receives the Letter of Dispute should acknowledge its receipt within seven (7)
calendar days (“the Letter of Acknowledgment”).  If further information as to the matters
detailed in the Letter of Dispute is required so as to deal with it then full particulars of the further
information required should be given by letter within seven (7) calendar days of the Letter of
Acknowledgement (the “Further Information”). If further information is required, such further
information should be provided within fourteen (14) calendar days from the date of the Letter
of Acknowledgement.  The time for responding to the Letter of Dispute does not commence
until the further information has been provided or a satisfactory explanation has been received
as to why it cannot be provided. 
Within fourteen (14) calendar days of the Letter of Acknowledgment or within fourteen (14)
calendar days from the provision of the further information the other party shall provide a full
response to the Letter of Dispute (the "Letter of Response").  The Letter of Response shall, if
appropriate, provide terms on which the dispute can be resolved.  If the Letter of Response
cannot deal with all of the issues raised within the Letter of Dispute within fourteen (14)
calendar days the responding party shall provide a date within which the full response will be
provided.  Such full response must be given within twenty-eight (28) calendar days of the latest
of the Letter of Acknowledgment or the provision of any further information.  When the Letter
of Response has been sent, Stage 1 is concluded.  If the dispute has not been resolved by the
end of Stage 1, the parties shall move to Stage 2. 
STAGE 2 - MEETING
Following on from the Letter of Response either party can request that a meeting takes place
between the Council (Head of Service) and the Provider.  The Council and the Provider shall
within seven (7) calendar days of such a written request meet in a good faith effort to resolve
the dispute (the “First Meeting”). 
If the dispute cannot be resolved in the First Meeting the dispute shall be referred to the
Managing Director of the Provider and the Head of Asset and Procurement Solutions to seek
to resolve the dispute (the “Final Meeting”). If appropriate the parties can invite key personnel
to this meeting. If the dispute cannot be resolved within twenty-one (21) calendar days of the
Final Meeting the dispute shall be referred to a mediator in accordance with Stage 3. 
STAGE 3 - MEDIATION
The parties shall seek to agree on the appointment of a mediator to act in relation to the dispute
or an organisation which shall be approached to nominate a mediator.  If the parties cannot
agree on the appointment of a mediator the matter shall be referred to CEDR to appoint a
mediator.  If agreeable to the mediator, the parties shall within seven (7) calendar days of the
appointment of any such mediator meet with them to agree a programme for the exchange of
any relevant information, the structure to be adopted for the mediation and a date for the
mediation to be held (the “Agreed Procedure”).  If the mediator is not agreeable to a meeting
or the parties deem it unnecessary for the mediator to be involved they will reach agreement
on the agreed procedure between themselves. The parties will then act in accordance with the
agreed procedure and seek to resolve the dispute through mediation.  If the Parties fail to reach
Page 58 of 128

Page 59

agreement within twenty-eight (28) calendar days of the mediation then any dispute or
difference between them may be referred to the Courts. 
STAGE 4 - LITIGATION
All disputes not resolved pursuant to the procedures set out above may be referred by either
party to the courts. 
GENERAL
For the avoidance of doubt this shall in no way prejudice any rights or remedies of either party
under the Agreement including without limitation the right of termination.  However this will
survive termination of the Agreement and will govern any post termination dispute.  Each party
shall bear their own costs in relation to any procedure adopted pursuant to this.  Unless the
Agreement has already been repudiated or terminated the Provider shall, notwithstanding this,
continue to carry out its obligations in accordance with the Agreement. 
Page 59 of 128

Page 60

SCHEDULE E 
SERVICE VALUES AND TARGETS 
1. North Lanarkshire’s Working, Working for Families and Additional Health &
Justice April 2026 - March 2027 
Type Or, details below
regardless of benefit
or length of
unemployment 
Outcomes
Groups Age 16 -67 with
barriers to entering
the labour market. 
Within 6 months of
leaving school and
leaving to a
negative destination
without intervention 
Unemployed 16-19
year olds 
Unemployed and
employed Parents
on Low Incomes 
Unemployed and
underemployed
residents 
1.1, 1.2 and 1.3 
Page 60 of 128

Page 61

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref  (AG/PK) Date 15/05/26 
Routes to Work Ltd – Performance & Financial Monitoring Report   
From  Alison Gordon, Chief Social Work Officer (Education, Families, Justice &
Integrated Practice)  
E-mail gordonal@northlan.gov.uk   
Executive Summary 
Routes to Work Ltd.’s performance was previously considered by the former ALEOs and
External Bodies Monitoring Sub Committee.  Following changes to North Lanarkshire
Council’s Scheme of Administration, responsibility for oversight of service delivery by arm’s
length bodies now rests with the relevant service committee. The functions delivered by
Routes to Work on behalf of the Council fall within the Terms of Reference of the Enterprise
and Fair Work Committee and a performance report is submitted in line with the Strategic
Performance Framework considered by members in November 2019.  This report outlines
Routes to Work Ltd.’s performance against its charitable objectives and Council priorities
for Q2 2025/26 to the end of Q3 2025/26.    The financial performance of Routes to Work
Ltd. for Q2 2025/26 to the end of Q3 2025/26 and overall financial standing is also included
within this report.   
In addition, the report provides a update on the ALEO Review Action Plan developed to
take forward the recommendations of the ALEO Review reported to Policy & Strategy
Committee in March 2025 and considered by the Enterprise and Fair Work Committee at
its meeting on 20 February 2026. 
Recommendations
It is recommended that Committee: 
(1) Acknowledge Routes to Work operational performance and finance for Q2
2025/26 to the end of Q3 2025/26, along with wider achievements during that
period (as outlined at Appendix 1); 
(2) Acknowledge the Routes to Work Action Plan which has been developed to take
forward the recommendations of the ALEO Review (as outlined at Appendix 7). 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Page 61 of 128

Page 62

1. Background 
1.1 Routes to Work, established in 2002, is a company limited by guarantee with charitable
status which is owned by North Lanarkshire Council.  The organisation provides a range
of free employability services to North Lanarkshire residents and specialises in
providing case worker support to unemployed residents as well as support with
accessing vocational training and the short-term costs associated with moving from
benefits to employment, such as childcare and travel.  They also provide in-work
support for up to 6 months for those participants that require it.     
1.2 In 2017 the company amended its Memorandum and Articles of Association to extend
its area of operation into other local authority areas thereby enabling Routes to Work
to bid to deliver national employability programmes in these areas. This is intended to
support the long-term sustainability of the company.   
1.3 Routes to Work’s Board of Directors currently consists of up to twelve members – two
are Category A members appointed by North Lanarkshire Council (one an elected
member, and one a senior Council officer) and up to ten Category B directors, who
bring specialist expertise to the company and are selected through a formal
nominations’ procedure. The Board currently has independent directors with interests
and/or experience in local community development and engagement, lifelong learning
and skills, business development and support, HR and Law. The Board of Directors
has responsibility for ensuring that Routes to Work’s services are delivered in
accordance with approved Service Level Agreements and charitable objectives and
meets quarterly to fulfil these duties.  Council funded activities delivered by Routes to
Work are also aligned to The Plan for North Lanarkshire and Council Programme of
Work areas.   
1.4 Routes to Work has been comprehensively reviewed in 2019 and 2024 with the latest
review being reported to the Policy and Strategy Committee on 13 March 2025 where
it was agreed that no change to the external delivery arrangements are needed and
that the organisation’s work remains aligned and integrated with that of the Council. In
addition to contractual performance monitoring by this committee, the Audit and
Scrutiny Panel is responsible for ensuring the effectiveness of each entity’s governance
arrangements, including financial governance. The Policy and Strategy Committee
retains responsibility for considering the outputs from reviews by the council into its
arm’s length delivery arrangements, including recommendations in relation to Best
Value and potential future delivery options. 
1.5 In a wider context Routes to Work Ltd has been central to North Lanarkshire Council
being among the best performing nationally in terms of numbers engaged and job
outcomes, as reported in the Local Government Benchmarking Framework 2024/25
outcomes for employability services.  The work of the organisation is integrated and
aligned with that of other employability providers in North Lanarkshire by our Local
Employability Partnership.  This removes duplication of provision while also ensuring
Ambition statement
(11) Increase economic opportunities for adults by understanding,
identifying, and addressing the causes of poverty and deprivation
and barriers to financial inclusion
Programme of Work Brighter Futures 
Page 62 of 128

Page 63

there is a range of support available that is tailored to the needs of individuals and their
communities. 
2. Report 
2.1 Operational Performance Q2 2025/26 to Q3 2025/26 
The operational performance overview for employability initiatives delivered by Routes
to Work in the reporting period are attached at Appendix 1.   The Q2 - Q3 2025/26
programme performance is very positive in terms of job outcomes with targets being
exceeded across all programmes and 743 unemployed and economically inactive
residents being supported into work against a target of 563.  This also demonstrates
the continued buoyancy in the North Lanarkshire job market with employers continuing
to recruit in this period.  There remains work to be undertaken in aspects of each
programme, whether increasing engagements or sustainability of jobs for the health
and justice clients supported into employment; however, the overall performance of
Routes to Work Ltd against targets remains consistently positive. 
The following points are service delivery highlights which are not included within the
performance measures. 
2.2 Routeway Delivery 
Routes to Work Ltd have expanded their Sector Routeway Delivery Programme which
targets sectors where there are a number of vacancies. The programme upskills clients
and supports their progression into sustainable employment opportunities in these
sectors. Aligned with local labour market demand these include Retail, Warehouse/
Logistics, Security and Health & Social Care. 
These sector-focused programmes provide targeted training, employer engagement,
and practical insight into specific industries. Participants are also supported to achieve
relevant accredited qualifications and industry-recognised certificates, enhancing their
employment opportunities.  
Partners employers included Hochtief (Routes to Highway Maintenance) and Victor
Pizza (Routes to Food Manufacturing). These employer-led programmes offered
tailored training and direct engagement with recruiting employers, resulting in
participants achieving sector-specific qualifications and progressing into employment.  
2.3 Community Benefit Links
Engagement through Community Benefits has increased in recent months, creating
additional opportunities for clients. This has resulted in a number of job offers within
the construction sector through engagement with Dem-Master, as well as paid short-
term work placements for youth clients with Optimal FM, delivered in partnership with
Kier Construction, providing valuable work experience. 
Discussions are also underway with Hochtief to explore future collaboration around
Community Benefits delivery and recruitment challenges. Initial areas of focus include
increasing women’s participation in construction, improving engagement with
underrepresented groups, and supporting more inclusive recruitment practices. 
Page 63 of 128

Page 64

2.4 Thematic Health Partnerships
Routes to Work Ltd has mature partnerships across multiple organisations to support
clients whose health is proving a barrier to work and work has been undertaken to
refresh and strengthen these with: 
• Jobcentre Plus Disability Employment Advisors
• NHS Occupational Therapists
• SAMH (Scottish Association for Mental Health)
• Homes First
• SACRO
Open communication, shared knowledge, and strong partnerships are creating a
collaborative, robust employability service for health clients, positioning Routes to Work
as a preferred provider.
2.5 Investors in People
Routes to Work is a Platinum-accredited Investors in People organisation and in
November it was shortlisted as a finalist in ‘The Award for Excellence in Building
Purpose Driven Impact’ at the Investors in People Awards 2025. Routes to Work did
not win on the night but the category was on a worldwide scale and this recognition for
Routes to Work further reinforces its reputation as a leading employability organisation. 
Routes to Work are continuing their Investors in People journey with a commitment to
work towards the We Invest in Wellbeing standard. This has commenced with a
wellbeing diagnostic undertaken by Investors in People in November.
Financial Performance Q2 2025/26 to Q3 2025/26
Public Accountability Obligations
2.6 To satisfy the Council’s duty to ensure the organisation delivering employment and
training services on its behalf is financially sound, the Council’s Section 95 Officer
maintains appropriate and proportionate processes and procedures for scrutinising
Routes to Work’s financial performance. 
2.7 The Council’s Legal Agreements with Routes to Work specify the financial information
which must be submitted to the Council including an annual business plan, quarterly
management accounts, audited financial statements etc. to enable Financial Solutions
to assess and report any financial risk likely to arise as a result of the Council using
Routes to Work to deliver these services. 
2.8 The Council expends revenue resources annually with Routes to Work to deliver
services which assist the Council in achieving its priority outcomes therefore has a duty
to ensure this money is being properly used to deliver both the Council’s and Routes
to Work objectives. 
Financial Outturn to 31st March 2025
2.9 The 2024/25 Annual Accounts approved by the Board at the AGM on 18 September
2025 reported a Net Movement in Funds of £0.809m, which are a result of an actuarial
gain on pensions of £0.642m and increased charitable activities of £0.167m.  Further
details on the Financial Outturn to 31 March 2025 is outlined in Appendix 2. 
Page 64 of 128

Page 65

Balance Sheet at 31st March 2025
2.10 Key balances are set out in Appendix 3 to provide members with an update on the
overall financial standing of the company, as at 31 March 2025, along with the
comparator figures as at 31 March 2024. Council representatives are asked to note
that the company has net assets, excluding pension fund assets, of £1.082m (£0.930m
in 2023/24).  Therefore, Members can be assured that the company has sufficient
resources to meet its current obligations.
Forecast Financial Performance at 30 June 2025
2.11 For financial year 2025/26, income approved from the Council is £5.019m which
represents 98% of the organisations total budgeted income of £5.113m.  The balance
of income of £0.094m is to support development and management costs. 
The outturn to 31 March 2026 is projected to be on budget at an operational surplus of
£0.072m. A detailed comparison of projected outturn to the 2025/26 Budget are
provided in Appendix 4.
Balance Sheet at 30 June 2025
2.12 Key balances are set out in Appendix 5 to provide members with an update on the
overall financial standing of the company, as at 30 June 2025, along with the
comparator figures as at 31 March 2025. Council representatives are asked to note
that the company has net assets, excluding pension fund assets, of £1.129m which is
a £0.047m favourable movement on the 31 March position.  This is predominantly due
to favourable movements in cash offset by increased creditors.  Therefore, members
can continue to have assurance in the company’s resources.  
Projected Cash flow to 31st March 2026
2.13 The cashflow for the year projected to 31st March 2026 is attached per Appendix 6.
Cash balances vary from a high of £2.311m in May 2025 to a low of £0.917m in March
2026.  This demonstrates that RTW will hold sufficient cash levels to carry out the
approved programme of work. 
ALEO Review Action Plan 
2.14 As reported to this Committee on 20 February 2026 an action plan has been developed
in consultation with Routes to Work Limited to address the areas identified and
recommendations from the ALEO Review. It was highlighted that implementation of the
Action Plan was already underway and future updates would be reported to this
Committee alongside the six-monthly performance and finance update.    The updated
Action Plan is therefore attached as Appendix 7. 
3. Measures of success 
3.1 Routes to Work Ltd. continue to provide an effective employability service on behalf of
the Council to support unemployed and underemployed residents of North Lanarkshire. 
Page 65 of 128

Page 66

3.2       Implementation of the agreed action plan supports the delivery of the council’s strategic
priorities and increases the alignment of Routes to Work activities with The Plan for
North Lanarkshire. 
4. Supporting documentation 
The following appendices support this report: 
4.1   Appendix 1           Routes to Work Ltd Performance Indicators & Outcomes 
4.2   Appendices 2 - 6  Routes to Work Ltd Financial Performance
4.3   Appendix 7           Routes to Work Ltd ALEO Review Action Plan 
Alison Gordon
Chief Social Work Officer (Education, Families, Justice & Integrated Practice) 
Page 66 of 128

Page 67

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty   
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The financial performance of Routes to Work is closely monitored by the council’s
Section 95 Officer and the financial performance as detailed above, along with
other key financial information presented in the report. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Page 67 of 128

Page 68

Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Routes to Work maintain a detailed risk register which is presented to each Board
meeting.  In terms of the Council, the risk of Routes to Work and the wider
employability programmes being deemed non-compliant with external funders is
present. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
Within all Council employability programmes veterans are immediately eligible for
support alongside other priority groups. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒
Page 68 of 128

Page 69

If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒
Page 69 of 128

Page 70

Appendix 1
Routes to Work – Q2 – Q3 2025/26 - Operational Performance 
Employability
Programme
Indicator Target
Outcome/Purpose
2025/26
Q2-3
Target
2025/26
Q2-3
Actual
Blue
Red
Amber
Green
Comments
Working For
Families 
Number of
starts
Out of work parents
engaged
162 228 B Funding from the Scottish Government to
support low income employed and
underemployed parents. Number of
starts
In work parents
engaged
81 64 R
Number of
qualifications
Accredited
Qualifications
54 112 B
Number of Job
Entries
Out of work parents
gaining work
81 133 B
Number of Job
Entries
In work parents
progressing in work
22 21 A
26-week
sustainment
Jobs sustained at 26
weeks
70% 76% B
Youth Service Number of
starts
Young People
Engaging
197 293 B Funding from the Scottish Government and UK
Shared Prosperity Fund to provide young people
aged 15 -19 years the opportunity of a job,
apprenticeship, further or higher education,
training programme or volunteering. Targeting
particularly excluded groups of 15-19 yr olds.
This programme also supports the Education
and Families Pathways Programme. 
Number of
qualifications
Accredited
Qualifications
64 116 B
Entered
FE/HE/Training
Moved into full time
education or training
programme
31 45 B
Number of Job
Entries
Young People gaining
employment 
102 145 B
26-week
sustainment
Jobs sustained at 26
weeks
70% 79% B
Thematic Service Number of
starts
Clients engaging 146 157 B Funding from the Scottish Government and UK
Shared Prosperity Fund to support residents
who main barrier to employment is justice and
health, to improve their life chances and
Number of
qualifications
Accredited
Qualifications
41 47 B
Page 70 of 128

Page 71

Number of Job
Entries
Clients gaining
employment
59 71 B increase their pre-employability skills. The aim is
to support project proposals that align with long-
term strategic plans for local growth, target
people most in need and support community
renewal.  Work is ongoing to identify further
support that may be needed to increase
sustainability of jobs.
26-week
sustainment
Jobs sustained at 26
weeks
70% 59% R
All Age Services Number of
starts
Clients engaging 623 562 R Funding from the UK Government to deliver an
all-age employability programme supporting
economically inactive and unemployed North
Lanarkshire residents to progress closer to and
into sustainable employment.
Number of
qualifications
Accredited
Qualifications
192 153 R
Number of Job
Entries
Clients gaining
employment
299 373 B
26-week
sustainment
Jobs sustained at 26
weeks
70% 74% B
Key: - 
B - Blue (above threshold) ≥5% of target 
G - Green (within threshold and on target) = to or + 5% of target 
A - Amber (within threshold but below target) 
R - Red (below threshold) ≤ 5% of target
Page 71 of 128

Page 72

Appendix 2
Routes to Work Limited
Outturn to 31 March 2025
Income & expenditure
2024/25
Revised
Annual
Budget
2024/25
Outturn to
31 March
2024/25
Revised
Budget vrs
Outturn
Commentary
£'000 £'000 £'000
Income from NLC
No one left behind 627 593 34
Prospects for Parents 725 631 94
S31 - UKSPF Employment Support 572 418 154
S35 - UKSPF Employability & Skills Support 2,688 2,503 185
Programme Information Reporting 44 42 2
Allocations 364 335 28
Total Income from NLC 5,019 4,522 497
Development Income 32 33 (2)
Other Income 62 265 (203)
Total Incoming Resources 5,113 4,820 293 Under-recovery is predominately due to the timing of receipt
of project income.
Expenditure:
Charitable Activities (5,042) (4,012) (1,030)
Total Resources Expended (5,042) (4,012) (1,030) Underspend is predominately due to realisation of acturial
gains on pensions.
Operational surplus / (deficit) 72 809 (737)Page 72 of 128

Page 73

Appendix 3
Routes to Work Limited
Overall Financial Standing - Balance Sheet as at 31 March 2024
Balances/ Indicator 31/03/2025
£'000
31/03/2024
£'000
Variance
£'000 Commentary
Fixed Assets 0 0 0
Current Assets:
Trade Debtors 48 764 (717) Improved timing of claims income which is reflected in increased Bank /
Cash.
Prepayments 685 577 108 Timing of grant claims.
Bank / Cash 1,380 511 868 Increase largely attributable to receipt of grant funding.
Short Term Investments 0 85 (85)
2,112 1,938 259
Current Liabilities:
Creditors inc. Advanced payments, VAT & other taxes (1,030) (1,007) (23) Minor
(1,030) (1,007) (23)
Net Current Assets 1,082 930 238
Defined scheme pensions liabilities 2,410 1,753 657 FRS102 actuarial valuation
Net Asset / (Liabilities) 3,492 2,683 895
Financed by Reserves:-
Designated Reserves 475 284 192
Increase predominately within the Impact and Growth Fund to align with the
RTW Business Plan and strategy for the next 2 years, coupled with
provison for office upgrades and a self-insurance fund.
Unrestricted funds 701 721 (20) Minor
Unrestricted Pension Fund 2,410 1,753 657 FRS102 actuarial valuation
Restricted Funds (94) (74) (20) Minor
Total Reserves 3,492 2,683 809Page 73 of 128

Page 74

Appendix 4
Routes to Work Limited
Projected Outturn  to 31 March 2026
Income & expenditure 2025/26 2025/26 2025/26 Commentary Variance Budget vrs Projected Outturn
Budget
Projected
Outturn to
31 March
2025
Variance
Budget vrs
Projected 
Outturn
£'000 £'000 £'000
Income from NLC
No one left behind 627 627 0
Prospects for Parents / WFF 725 725 0
Programme Information Reporting 44 44 0
S31 - UKSPF Employment Support 572 572 0
S35 - UKSPF Employability & Skills Support 2,688 2,688 0
Allocations 364 364 0
Total Income from NLC 5,019 5,019 0
0
Development Income 32 32 0
Other Income 62 62 0
Total Incoming Resources 5,113 5,113 0
Expenditure:
Charitable Activities (5,042) (5,042) 0
Total Resources Expended (5,042) (5,042) 0
Operational surplus / (deficit) 72 72 0 Surplus due to timing of receipt of incomePage 74 of 128

Page 75

Appendix 5
Routes to Work Limited
Overall Financial Standing - Balance Sheet as at 30 June 2025
Balances/ Indicator 30/06/2025
£'000
31/03/2025
£'000
Variance
£ Commentary
Fixed Assets 0 0 0
Current Assets:
Trade Debtors 31 48 (16) Minror
Prepayments 695 685 11 Minor
Bank / Cash 1,977 1,380 597 Increase largely attributable to receipt of grant funding.
Short Term Investments 0 0 0
2,703 2,112 592
Current Liabilities:
Creditors inc. Advanced payments, VAT & other taxes (1,574) (1,030) (545) Advance payment from UKSPF
(1,574) (1,030) (545)
Net Current Assets 1,129 1,082 47
Defined scheme pensions liabilities 2,410 2,410 0 On target
Net Asset / (Liabilities) 3,539 3,492 47
Financed by Reserves:-
Designated Reserves 467 475 (8) Minor
Unrestricted funds 731 701 30 Minor
Unrestricted Pension Fund 2,410 2,410 0 On target
Restricted Funds (69) (94) 25 Minor
Total Reserves 3,539 3,492 47Page 75 of 128

Page 76

Page 76 of 128

Page 77

Appendix 7
Routes to Work Ltd – ALEO Review Action Plan (December 2025)
Action
Ref
Improvement
Area
SMART Goal Key Actions Responsible
Officer / Team
Timescale Resources
Required
Performance
Measure
Alignment to NLC
Plan
RTW01 Strengthen
Alignment and
collaboration
Deepen
integration with
NLC’s Plan and
Programmes of
Work 
- Schedule quarterly
strategic review
meetings with NLC
representatives to
assess alignment.
- Develop an internal
tracking system to
map RtW objectives
directly to NLC’s
evolving strategies.
- Assign a liaison
officer to maintain
continuous
communication with
NLC on any relevant
programme of work
changes. 
RTW – KC & DJ 
NLC – PK 
To
31/03/2027
- Time
- Up to date
information on
any changes to
NLC Plan
- Quarterly
meetings held
- Tracking
system in
place
- Regular
meetings of
liaison officer
and NLC
representative
These meetings will
regularly tie the
actions of the
organisation to The
Plan for NL and
make explicit links,
on an ongoing basis,
to the POWs.  Most
often the Brighter
Futures and
Resilient People.
Update: Quarterly
meetings
established and
first has taken
place.  RTW are
monitoring NLC
reports and
changes to POW to
ensure their work
complement
these.
Page 77 of 128

Page 78

RTW02 Strengthen
Alignment and
collaboration
Ensure flexible
and targeted
service delivery
(particularly
economically
inactive, school
leavers,
restorative
justice and
mental health
initiatives)
- Run an engagement
team for 2025/26 to
support engagement
of economically
inactive individuals
with a six-month
review.
- Expand health and
justice services for
2025/26 delivery 
RTW – KC & DJ
NLC - PK
01/04/2025-
31/03/2026
- Provision
included in
SLA
- Time 
- Stakeholder
involvement 
- Engagement
team in place
with review
carried out at
October 2025
- Increased
service
provision for
health &
justice clients; 
- increased
number of
clients
supported
Clear links to
Resilient People
programme of work
– many of those
supported by the
organisation are
also engaged by
other Council
services which
promote inclusion
and tackle poverty.
Update:
COMPLETE -  All
action
implemented in
last 9 months,
review carried out
and assessment of
numbers of clients
carried out
showing an
increase on 24/25.
RTW03 Strengthen
Alignment and
collaboration
Ensure branding
and
communication
reflect NLC’s
funding and
support role
- Develop co-branded
marketing materials
highlighting NLC’s
support.
- Implement a
communication
strategy ensuring
stakeholders
recognise NLC’s
contributions.
RTW – GRM &
CL
NLC - PK
By
31/03/2026
- Time
- Stakeholder
involvement
- Marketing,
promotion and
communicatio
n expertise 
- Updated
branded
marketing
materials that
highlight NLC’s
support
- Communicatio
n strategy in
place and
implemented
The Brighter Futures
programme can be
used as the vehicle
which supports the
integration of RTW
branding with that of
NLC.
Page 78 of 128

Page 79

Update:
COMPLETE - New
branding utilising
NLC ‘Work Here'
now being used. 
RTW04 Strengthen
Alignment and
collaboration
Address any
duplication in
service delivery
- Perform a joint audit
of existing skills
training programs
between RtW and
NLC.
- Identify any
duplication and
inefficiencies and
provide a strategy to
avoid these. 
RTW – DJ
NLC – PK and
CL&D
By
31/03/2027
- Time
- Co-operation
of NLC officers
in providing a
full audit of
NLC training
programmes
- Draft strategy
produced to
maximise
efficiency in
provision
- Audit
completed of
skills training
programmes
across RTW
and NLC
- There are no
duplication or
inefficiencies 
Brighter Futures
Board can address
any duplication of
provision and be
used to integrate
and align RTW with
NLC programmes.
Update: RtW
currently mapping 
their provision and
procurement
against the
services delivered
by NLC.
RTW05 Enhance
financial
sustainability
Explore
alternative
sources of
funding 
- Identify and apply for
one or two relevant
grant opportunities
annually.
- Research and assess
the feasibility of new
income-generating
services with other
Local Authorities 
RTW – SMa &
KC
NLC - PK
By
31/03/2026 &
by
31/03/2027
- External
opportunities
available
- Time 
- Brokered
introductions 
- Income
received
through
external grants
- Services
delivered in
other local
authorities
Brighter Futures
supports the co-
ordination and
integration of
external funds for
skills and
employability.
Update: Currently
have a 12-month
contract in West
Page 79 of 128

Page 80

Lothian until March
2026 – and a 3
month extension
until June 2026.
Continue to apply
for new funding
opportunities
RTW06 Enhance
financial
sustainability
Evaluate cost
structures 
- Conduct a salary and
benefits
benchmarking study
comparing RtW roles
with NLC equivalents.
- Assess any potential
savings for RtW
contracted services 
RTW – GRM
NLC – PK 
By
31/03/2026 &
by
31/03/2027
- Time
- Benchmark
data - Access
to NLC salaries
/ benefits 
- Information on
relative costs /
benefits of
NLC services
(that RTW
currently
contract) 
- Benchmarking
exercise
complete 
- Potential
savings
identified 
This improvement
area is shared
across the public
and third sector in
terms of being
legally required to
ensure RTW achieve
Best Value when
they perform their
day to day activities.
Update: RtW have
gathered
recruitment packs
and are working
with NLC to get
data on similar
roles in NLC (they
are also looking at
identical roles in
other LA’s where
their service is
delivered in
house).
Page 80 of 128

Page 81

RTW07 Enhance
financial
sustainability
Ensure reserves
meet operational
costs over the
short term
- Review current
reserves against
OSCR guidelines &
short term
operational costs to
ensure compliance. 
RTW – Board,
KC & KA
NLC – PK and
Finance
By
31/03/2026 &
by
31/03/2027
- Time
- OSCR
guidelines 
- Continued
compliance
with reserves
policy
- Short term
operational
costs
adequately
covered
This is a financial
issue for RTW
because of its third
sector status and its
OSCR
requirements.
Update: Current
reserves can fully
cover the wind up
of the company
and meet all
contingent
liabilities for 25/26.
OSCR rules on
excess reserves
restrict RTW
holding significant
amounts more
than that.  Further
discussion
planned with NLC
finance to
establish what is
required by NLC.
RTW08 Build capacity
and mitigate
recruitment
challenges
Address
recruitment and
retention
challenges
- Conduct a staff
turnover review over
the past 4 years and
assess any ongoing
recruitment
challenges
RTW - GRM By
31/03/2027
- Time
- Data – staff
turnover;
recruitment
challenges,
incentives,
benefits and
- Staff turnover
trends
- Retention of
new recruits
- Maximised
recruitment
Brighter Futures
supports the co-
ordination of
recruitment and
retention issues.
Page 81 of 128

Page 82

- Review and update
recruitment
incentives, including
benefits and career
development
pathways. 
career
development
pathways 
and retention
benefits
Update: The
environment in
which this action
was developed has
changed and
recruitment and
retention have
faded as an issue
for the company. 
Continues to be
monitored.
RTW09 Build capacity
and mitigate
recruitment
challenges
Tackle sickness
absence issues
- Compare RtW’s
current absence
management rates
with NLC’s levels &
identify any good
practice
- Revise the Wellbeing
strategy and
implement year 1
(this has been
superceded by the
pursuit of IIP’s We
invest in Wellbeing
accreditation)
RTW – GRM &
CL
NLC – PK and
People
Resources
By
31/03/2026
and by
31/03/2027
- Time 
- Access to
NLC’s sickness
absence rates
- Allocation of
funds for We
Invest in
Wellbeing
accreditation
- RTW Wellbeing
group input
- Increased
attendance
rate
- Good practice
identified and
shared
- Wellbeing
strategy and
activities in
place
- Accreditation
from IIP
obtained in 3
years
Brighter Futures
supports the co-
ordination of
recruitment issues.
Update: A new
well-being strategy
for staff is being
developed with
staff included in
research. 
Increased co-
operation with NLC
on recruitment.
RTW10 Build capacity
and mitigate
recruitment
challenges
Update
workforce skills
and capabilities
- Implement annual
skills audits to assess
workforce capability
gaps.
- Design targeted
training programs
RTW - GRM By
31/03/2026 &
by
31/03/2027
- Time
- Skills audit
matrix
developed
- Funds for
training
- Skilled and
qualified
workforce
Brighter Futures
supports the co-
ordination of skills
development and
recruitment.
Page 82 of 128

Page 83

based on audit
results. 
programs built
into SLA
Update: A Strategic
people plan has
been developed
and is being used
to refresh staff
training.
RTW11 Maximise
income
generation
Leverage
accredited SQA
centre status
- Expand course
offerings to include
high-demand
qualifications.
- Form strategic
partnerships with
local businesses to
create industry-
specific training
programs.
- Market the SQA
centre to external
clients to generate
additional revenue. 
RTW – DJ &
KMcL
By
31/03/2027
- Time
- Funding built
into SLA, and
training for
additional
qualifications
for skills
delivery staff
- Intelligence on
labour market
demands
- Focus on
marketing
activity 
- Increased
number &
variety of
qualifications
delivered
- Increased
number of
industry
routeways
delivered
- Income
generated due
to external
delivery of
qualifications 
Clear and positive
overlap with the
workstreams within
Brighter Futures for
future planning. 
Update:  Sectoral
routeways being
delivered to local
employers in care,
retail and
hospitality/
security with offer
of SQA
accreditation for
staff attached.
RTW12 Maximise
income
generation
Target tendering
opportunities
- Develop a centralised
database of
upcoming tender
opportunities.
- Assemble a fully
operational process
and resource to
RTW – KC,
GRM, SMa
NLC – PK 
By
31/03/2026 &
by
31/03/2027
- Time
- Bid writing
expertise for
large scale
contracts
- Stakeholder
involvement
- Systematic
environmental
scanning
- Clear roles,
responsibilitie
s, process and
tracking in
place for
Clear and positive
overlap with the
workstreams within
Brighter Futures for
future funding
opportunities.
Page 83 of 128

Page 84

assess and appraise
opportunities
- Provide clear
responsibilities on
bid-writing team
creation and process
map the
responsibilities
- Partner with other
organisations
(including NLC) to bid
on large-scale or
multi-year contracts,
where applicable. 
responding to
opportunities
- New large
scale or multi
year contracts
obtained in
partnership
Update: This has
been achieved for
this year with all
points
implemented.  To
be reviewed in
26/27.
RTW13 Maximise
income
generation
Expanded
utilisation of
Teckal status 
- Identify key services
that could be
delivered under
Teckal provisions.
- Engage with NLC
procurement teams
to streamline Teckal
contract processes.
RTW – KC, DJ,
SMa
NLC – PK &
other
departments
By
31/03/2027
- Time
- NLC to identify
services
across council
departments
that could be
delivered by
RTW under
Teckal
(Education,
ADP etc)
- Access to NLC
procurement
personnel
- Understanding
of Teckal
across Council
departments
- Increase in
services
delivered by
RTW through
Teckal
exemption
- Expansion of
RTW delivery
to various
council
departments
- Less
procurement
activity for NLC
procurement
teams 
Clear and positive
overlap with the
workstreams within
Brighter Futures for
future funding
opportunities,
which may also be
useful for other
programmes of work
if a non NLC vehicle
is needed to apply
for funding.
Update: Meetings
and discussions
underway with NLC
Page 84 of 128

Page 85

- RTW - Planning
for additional
services e.g.
Recruitment
staff and teams to
establish clear
plan for
progressing action.
Will be complete in
timescale.
Staff - Key
ID Role  ID Role
KC Chief Executive (RtW) CL Service Improvement Manager
(RtW)
GRM Depute Chief Executive (RtW) SMa Impact & Growth Manager (RtW)
DJ Head of Operations (RtW) KA Finance Manager (RtW)
KM Operations Manager (RtW) PK Business Manager (NLC) 
Page 85 of 128

Page 86

Page 86 of 128

Page 87

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref     PH/YW Date 15/05/26 
Fusion Assets’ Performance and Financial Monitoring Report 
From  Pamela Humphries, Chief Officer (Place)  
E-mail Yvonne Weir, weiry@northlan.gov.uk 
Executive Summary 
This report provides details of the operational performance of Fusion Assets Limited.
(Fusion Assets) during 2025/26. It outlines a range of economic outputs and outcomes
being delivered through this Arm’s Length Organisation (ALEO) and details key highlights
achieved during 2025/26. 
The report also details the overall current financial standing of Fusion Assets (as at 31
December 2025) and future financial projections. 
In addition, the report notes the progress in delivering the action plan developed to take
forward the recommendations of the ALEO Review reported to Policy & Strategy
Committee in March 2025. 
Recommendations
It is recommended that the Enterprise and Fair Work Committee: 
(1) Acknowledges the content of this report and the operational targets set for Fusion
Assets during 2025/26 and performance against these; 
(2) Acknowledges the overall current financial standing of Fusion Assets and future
financial projections as detailed in 2.2.5 onwards; and 
(3) Acknowledges the progress in delivering the action plan developed to take forward
the recommendations of the ALEO Review (as outlined in Appendix 5)  
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (3) Maximise the use of our marketable land and assets through
improved development in business and industrial infrastructure
Programme of Work Transforming Places
Page 87 of 128

Page 88

1. Background 
1.1 Fusion Assets is a wholly owned subsidiary of the council. It focuses on delivering
physical economic regeneration projects across North Lanarkshire and in particular
industrial development – a market where there is currently limited speculative
development. Unlike more traditional council owned property companies, Fusion
Assets is similar to an urban regeneration company whose role is focused on the
redevelopment of vacant and derelict land and brownfield sites rather than commercial
property management. 
1.2 It should be noted that Fusion Assets does not receive an on-going or recurring
management fee from the council for the delivery of services. Instead, Fusion Assets
uses grant funding from various sources such as the North Lanarkshire’s annual
Vacant & Derelict Land Fund (VDLF) allocation from the Scottish Government to enable
investment in the acquisition and redevelopment of vacant and derelict land sites. In
taking this forward, Fusion Assets has developed a unique and innovative development
model where the value of acquired/remediated land sites, together with other loan
funding and Fusion’s reserves, is used as equity to set up joint venture partnerships
with the private sector that will fund and manage the commercial redevelopment of
sites for industrial use. Once industrial units are complete and let, or partially let, they
are sold to a private sector investor with returns used to pay off loan funding and re-
invest in future regeneration projects, unless restricted by the terms and conditions of
any grant funding. During 2025/26 this model has been extended to utilise funding
through the Glasgow City Region’s Enabling Commercial Space Programme to
construct industrial units on previously remediated sites - with the first phase of this
programme focusing on development at Ravenscraig Industrial Site. 
1.3. Fusion Assets’ operational and financial performance was previously considered by the
former ALEOs and External Bodies Monitoring Sub Committee. Following changes to
the council’s Scheme of Administration, responsibility for oversight of service delivery
by arm’s length bodies now rests with the relevant service committee. The functions
delivered by Fusion Assets on behalf of the council therefore fall within the Terms of
Reference of the Enterprise and Fair Work Committee. 
1.4. In addition to performance monitoring by service committees, the Audit and Scrutiny
Panel holds responsibility for ensuring the effectiveness of the administrative and
financial governance of all of the council’s ALEOs (including Fusion Assets) whilst the
Policy and Strategy Committee retains responsibility for considering the outputs from
reviews by the council into its arm’s length delivery arrangements, including
recommendations in relation to Best Value and potential future delivery options.   
2. Report 
2.1 Operational Performance 
Gartcosh Industrial Park 
2.1.1 Gartcosh Industrial Park, a site of just over 13.5 hectares is being developed over 4
phases. The first phase is complete with 6.95 hectares of land remediated and 3 units
(totalling 5,435 sqm of industrial space) constructed and currently fully let. The
remainder of the site has been remediated over 3 phases to create a development
ready site. Activity at Gartcosh in 2025/26 has focused on further works to phase 2 and
securing planning approval for the development of phase 4. 
Page 88 of 128

Page 89

2.1.2 In relation to phase 2, a non-material variation application has been approved and a
new design team appointed. Fusion Assets is working through a joint venture company
- Gartcosh Estates LLP - to bring forward the next phase of development later this year
consisting of a further 3 units totalling 6,155 sqm. 
2.1.3 Progress has also been made at phase 4 of Gartcosh Industrial Park with a detailed
planning application submitted and approved for a standalone 3,744 sqm industrial unit.
Work is underway to complete all pre-commencement conditions on site to prepare for
the next stage of enabling works for which funding has been secured from the Vacant
and Derelict Land Fund. 
Condor Park, Eurocentral 
2.1.4 Condor Park is a 1.3 hectare site at Eurocentral that was purchased from Scottish
Enterprise by Fusion Assets prior to initiating a programme of site remediation and
enabling works. The proposed development has the aim of supporting the construction
of smaller industrial units to meet the local demand for this type of business space.
Planning approval is in place for construction of a multi-let industrial scheme consisting
of 8 units totalling 3,744 sqm. A package of enabling works was undertaken in 2023/24
to complete the site remediation and ensure the land was in development ready
condition. 
2.1.5  It is proposed that the development of Condor Park will be taken forward through a new
joint venture company which Fusion Assets have been in negotiation over following the
collapse of the original JV partner at the start of Covid. Unfortunately delays in moving
the development forward have resulted in an increase in costs and a potential funding
gap needs to be addressed to ensure the schemes viability. As a result, Fusion Assets
is currently reviewing the development options for the site. 
Ravenscraig Enterprise Park 
2.1.6 Substantial progress has been made in 2025/26 in respect of the development of plot
1 at Ravenscraig Enterprise Park. Glasgow City Region funding has been awarded
through the Enabling Commercial Space Programme to develop the site which will be
delivered in 2 phases each consisting of 2 industrial units. The full business case for
phase 1 was submitted and approved allowing construction of the initial two industrial
units of circa 2,787 sqm which commenced in March 2026 with works scheduled for
completion at the end of the year. 
2.1.7 The design team is in place for phase 2 of the development and are working towards
submission of a building warrant application. The full business case will be submitted
to Glasgow City Region and once approval is received it is planned that works will
commence on site later this year. 
Link Park, Newhouse 
2.1.8 Link Park consists of two plots of vacant and derelict land on either side of the Glasgow
and Edinburgh Road at Newhouse. Fusion Assets has remediated the land and built
out the development in a series of phases over the years. The southern plot was sold
and developed out through a joint venture partnership with Newlands Developments to
build a new 4,410 sqm distribution facility for the Co-Op. 
2.1.9 The northern plot adjacent to the M8 has been retained by Fusion Assets who have
built out three industrial units totalling 5,085 sqm. Construction of the final building at
Link Park commenced in May 2025 and was completed ahead of schedule in
Page 89 of 128

Page 90

December 2025. A tenant was secured for immediate entry following the completion.
Ritchie Engineering took up occupancy of building 3 in January 2026 brining some 45
- 50 jobs to North Lanarkshire. 
Updates from other developments 
2.1.10 Following a tender exercise a design team has been appointed to take forward the first
phase of development at Westfield Point, Cumbernauld. This is a 1,992 sqm multi let
industrial scheme which will be funded through the Glasgow City Region’s Enabling
Commercial Space Programme. 
2.1.11 Committee members should note that in December 2025 Fusion Assets sold the
Lanarkshire Enterprise Park (LEP) site at York Road, Chapelhall to HFD/DataVita for
the extension of an adjacent primary substation and a new 9,290 sqm datacentre 
2.2 Financial Impact 
Public Accountability Obligations – Financial year 2025/26 
2.2.1 To satisfy the Council’s duty to ensure the organisation delivering economic
regeneration projects on its behalf is financially sound, the Council’s Section 95 Officer
maintains appropriate and proportionate processes and procedures for scrutinising
Fusion Assets financial performance. 
2.2.2 The Council’s legal agreements with Fusion Assets specify the financial information
which must be submitted to the Council including an annual business plan, monthly
management accounts, audited financial statements etc., to enable Finance to assess
and report any financial risk likely to arise as a result of the Council using Fusion Assets
Limited to deliver these services. 
2.2.3 The Council expends VDLF resources annually with Fusion Assets to deliver services
which assist the Council in achieving its priority outcomes.  The Council has a duty to
continue to ensure this money is being properly used to deliver both the Council’s and
Fusion Assets key objectives. Fusion Assets has also been allocated funding from
GCR Enabling Commercial Space programme. This funding requires the submission
of quarterly claims which are subject to verification processes to ensure compliance
with the conditions of the grants awarded. 
2.2.4 The final position for financial year 2024/25 was presented to this committee in
November 2025. The 6 month performance report due to be presented in November
2026 will provide the outturn financial position for the period April 2025 to March 2026. 
Overall Financial Standing as of 31 December 2025 
2.2.5 Appendix 2 gives an update on the overall financial standing of the company, as of 31
December 2025, together with further information and previous year’s comparator
figures.  The company has cumulative net assets of £10.131m predominately as a
result of investment property at Newhouse, work in progress and cash balances, offset
by deferred VDLF income.   Members should be assured that the company has
sufficient resources to meet its current commitments. 
Page 90 of 128

Page 91

Financial Performance 1 April 2025 to 31 December 2025 
2.2.6 The company approved a 2025/26 operating budget with projected net operating
income of £0.003m.  This results in a decrease on the utilisation of reserves of £0.182m
from 2024/25 and is mainly the result of the increased rental income.  For 2025-26 the
company was successful in securing VDLF funding of £1.798m and a further £3.1m in
funding via a successful Glasgow City Region Enabling Commercial Space bid. 
2.2.7 Based on their financial statements to 31st December 2025, Fusion Assets is currently
projecting an increased over-recovery of £0.092m against budget, which is
predominately due to the timing of recruitment of the project manager post and
increased bank interest.  A summary is provided at Appendix 3 along with previous
year comparator outturn position. 
2.2.8 Reflecting the regeneration and project-based nature of Fusion Assets, the company’s
project (capital) development expenditure is monitored cumulatively with spend on all
projects fully tracked back to each project’s inception.  The summary financial position
of the projects as at 31 December 2025 is outlined in table 1 below. 
Table 1 – Capital development expenditure 
Budget Actual Projection Variance
(Budget v
Projection) 
£’mm £’m £’m £’m
Expenditure 
(VDLF & Non VDLF)
32.161 27.720 32.654 (0.493)
Income 
(VDLF & Non VDLF)
(34.873) (26.108) (37.381) 2.508     
Net Cost/Surplus (2.712) 1.611 (4.727) 2.015 
2.2.9 As outlined above, cumulative budgeted expenditure of £32.161m has been approved
by Fusion Asset’s Board, which will be met from budgeted income of £34.873m, a
combination of VDLF grant, regeneration capital grant funding, City Deal funding,
anticipated capital receipts and Fusion Assets own resources.   
2.2.10 An overall surplus of £2.015m is currently projected, which is an increase of £1.734m
(largely as a result of the sale of the LEP/York Road site) from what was previously
reported. These are estimates reflecting current valuations of land transfers and
receipts from onward sales, which may fluctuate, impacting the surplus projected. 
2.2.11 As of 31 December 2025, net expenditure of £1.611m is reported, with a projected
£4.934m of expenditure still to be incurred on pre-development and building works. 
Further receipts of £11.273m are still anticipated, mainly from the onward sale of
developments, VDLF funding & City Deal funding. 
2.2.12 Following the sale of the LEP/York Road site, the total development investment of the
current portfolio is in the order of £50m, which predominantly rests with the joint
venture companies and excludes some £17.5m of predevelopment works funded
through VDLF grants. Fusion Assets share of total development costs will be in the
order of £8 -10m and will consist of a mixture of land, cash contributions and recycled
receipts.
Page 91 of 128

Page 92

Cash Flow Forecast to December 2027  
2.2.13 Fusion Assets requires effective cash management to support its development
programme therefore the cash position is closely monitored, with the cash balance as
at 31 December 2025 totalling £6.649m. The cash flow forecast to December 2027 is
shown in Appendix 4. Based on estimated expenditure and receipts the forecast
demonstrates there is sufficient funding available to carry out the proposed
development programme.  The lowest cash balance over the 24 month period is
forecast at £3.198m in October 2027, with the cash balance forecast to be £3.200m
by the end of December 2027. 
2.3 ALEO Review Action Plan Update 
2.3.1 The ALEO Review reported to Policy & Strategy Committee in March 2025 identified
17 areas for future development within Fusion Assets under 6 main themes which are: 
• Address Staffing and Knowledge Risks
• Enhance Administrative and Operational Resource
• Expansion of Service Offerings and Expertise
• Align more closely with Strategic Objectives
• Amend Articles of Association for Broader Objectives
• Branding and Digital Presence 
2.3.2 An action plan was developed in consultation with Fusion Assets to address the areas
identified and recommendations from the ALEO Review. The action plan represents an
initial evaluation of the proposed actions and is designed to be a dynamic document,
subject to ongoing review and refinement. Progress in taking forward the actions is
being reported regularly to the Fusion Assets’ Board, with the last report being
presented on 10 March 2026. 
2.3.3 The Enterprise and Fair Work Committee is responsible for overseeing the
implementation of the action plan through its biannual performance monitoring reports.
The progress against each of the actions is set out in Appendix 5 of this report with the
following highlights noted: 
• Phase 1 of the Ravenscraig Industrial Site development funding through the
Enabling Commercial Space programme has been fully approved securing £3.1m
towards the development of the initial 2 industrial units
• A new project manager post has been established and the successful candidate
started work with Fusion Assets in January 2025
• New website has been developed and is ready to be launched to increase branding
and digital presence   
3. Measures of success 
3.1 Fusion Assets measures of success are reflected in the level of physical
regeneration works which they deliver together with economic outcomes achieved
from investment made. Section 2.1 of this report set out the progress being made
with each of the current live projects that Fusion Assets is taking forward. Appendix
1 provides further information on the outcomes achieved. 
Page 92 of 128

Page 93

3.2     For 2026/27 Fusion Asset’s targets and outcomes are as follows: 
• Secure funding and commence construction of the second phase of
development (three units totalling 6,155 sqm) at Gartcosh Industrial Park
through its joint venture company – Gartcosh Estates LLP. 
• Secure funding and commence construction at Condor Park, Eurocentral
• Complete construction of phase 1 units at Ravenscraig Enterprise Park, and
complete tender process for phase 2 of the site.
• Complete enabling works on plot 4 at Gartcosh Industrial Park
• Continue to implement the Action Plan in response to recommendations in the
ALEO review reported to Policy & Strategy Committee in March 2025.     
4. Supporting documentation 
Appendix 1  Performance Outcomes 
Appendix 2 Fusion Assets Limited - Overall Financial Standing as at 31st Dec 2025
Appendix 3 Fusion Assets Limited - Financial Performance as at 31st Dec 2025
Appendix 4 Fusion Assets Limited - Cashflow Forecast as at 31st Dec 2025
Appendix 5 Fusion Assets Limited – ALEO Review Action Plan (March 2026) 
Pamela Humphries
Chief Officer (Place)  
Page 93 of 128

Page 94

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The financial performance of Fusion Assets Limited is closely monitored by the
council’s Section 95 Officer and the financial performance as detailed above, along
with other key financial information presented in the report. 
Fusion Assets Limited does not receive an on-going or recurring management fee
from the council for the delivery of services but rather uses grant funding from the
external sources to enable investment for the acquisition and redevelopment of
vacant and derelict land sites. 
Fusion Assets Limited currently receives grants from through North Lanarkshire
Council from the Scottish Government Vacant and Derelict Land Fund (VDLF) and
the Glasgow City region Enabling Commercial Space Programme. Claims are
submitted and processed on a quarterly basis to draw down these funds. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Page 94 of 128

Page 95

Grant agreements are being developed are in place between North Lanarkshire
Council and Fusion Assets Limited for both the GCR Enabling Commercial Space
Programme (Ravenscraig Phase 1) and VDLF 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The work carried out by Fusion Assets contributes to the remediation of vacant and
derelict land to bring it back into productive use. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Individual Project Risk Registers are in place for projects. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)?
Page 95 of 128

Page 96

Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 96 of 128

Page 97

Appendix 1 
Fusion Assets Limited - Operational Performance and Outcomes   
Completed Developments 
Land
remediated
/improved
Units New/relocated
enterprises* 
Gross Jobs
created** Total Cost Current/Final position
Dundyvan Enterprise
Park  1.25 Ha 14 units
4,088 sqm 13 119 £2,985,993 Investment sold in 2018
Western Campus,
Bellshill  1.4 Ha 16 units
4,108 sqm 12 166 £4,209,915 Investment sold in October 2019
Enterprise House, 
Drumpellier Business
Park 
1.2 Ha
office
pavilion
790 sqm 
4 53 £1,646,596 Offices are currently fully let and retained by the
JV
Gartcosh (Phase 1)  2 Ha 3 units
5,481 sqm 3 85 £5,541,621 Investment sold in April 2024
Link Park, Newhouse
(plot 2A) 3.2 Ha  1 unit
4,645 sqm 1 50 £12,097,221 Building fully let and investment sold in June
2024
Lanarkshire Enterprise
Park 1.3 Ha 3 units
3,809 sqm N/A N/A £2,117,000 Site sold in December 2025
Bellshill Main Street  0.16 Ha 18
residential  N/A N/A £281,000 Site sold to Clyde Valley Housing for residential
use
* figures relate to enterprises at the time of sale and are not updated thereafter
** figures relate to jobs created by the date of the sale and are not updated thereafter 
Page 97 of 128

Page 98

Developments completed and Retained 
Land
remediated
/improved
Units New/relocated
Businesses* 
Gross Jobs
created** Total Cost Current/Final position
Link Park, Newhouse  2.6 Ha 3 units 4 163 £8,223,951 Fully let and retained by Fusion Assets 
Developments in progress 
Land
remediated
/improved
Units New/relocated
Businesses* 
Gross Jobs
created**
Total Cost Current/Final position
Drumpellier Business
Park 1.2 Ha 42 houses N/A N/A  Remaining land - residential
Gartcosh (Phase 2)
1.8 Ha 3 units
6,040 sqm   
Remediation and enabling works complete.
Construction of units to start in 2026/27 subject
to funding
Gartcosh (phase 3) 2.5 Ha 4 units     Remediation and enabling works complete
Gartcosh (Phase 4) 1.19 Ha I unit     Site investigation complete and remediation
and enabling works started in 2025/26
Westfield Point,
Cumbernauld (phase 1) 1.45 Ha 2 buildings
1,950 sqm   
Design works to be undertaken in 2026/27 and
timescale for construction agreed
Condor Park, Eurocentral 1.3 Ha 8 units
3,809 sqm   
Funding options for construction works being
considered
Ravenscraig Enterprise
Park Plot 1 2.5 Ha 4 units   
Enabling Commercial Space funding for
construction secured and phase 1 started on
site 
Page 98 of 128

Page 99

Appendix 2
Fusion Assets
Overall Financial Standing - Balance Sheet as at 31 December 2025
Balances/ Indicator as at 31
December 2025
as at 31 March
2025
Movement Commentary
£'000 £'000 £'000
Fixed Assets:
Investments 0 0 0 On target
Investment Property 4,320 4,320 0 On target - Newhouse Building 1 & 2
4,320 4,320 (0)
Current Assets:
Stocks 7,298 3,876 3,422 Work in progress
Trade Debtors (72) 1,655 (1,728)
Predominately due to VAT recoverable, deferred taxation, accrued income,
prepayments - cr due to sale of York Rd site in Dec25 (Sales VAT)
Bank 6,650 3,806 2,844
Increase largely due to reciept of profit share element in relation to sale of part
of the Newhouse development
Short-Term Investments 0 0 0 On target
13,875 9,337 4,538
Current Liabilities:
Trade Creditors 0 0
Other Creditors inc. VAT & other taxes (5,750) (6,058) 308 Deferred income (VDLF), accruals, tax
(5,750) (6,058) 308
Net current Assets/(liabilities) 8,125 3,280 4,846
Creditors:  Amounts falling due over 1 year (2,314) (2,314) 0 On target - deferred income (Boots)
Net Asset / (Liabilities) 10,131 5,285 4,846
Page 99 of 128

Page 100

Appendix 3 
Fusion Assets Limited
Financial Performance as at 3tst December 2025
Income & expenditure 2024/25 Commentary
Annual
Budget
Projected
Outturn Variance Final Outturn
£ £ £ £
Rental Income 319,598 293,823 (25,775) 303,813On target
Misc Income 99,120 50,400 (48,720) 0On target
Bank Interest 25,000 98,821 73,821 117,412Increase in bank interest due to level of cash balances,
cashflows and use of high-interest account
Investments 0 0 0 0On target
Misc 0 0 0 710,768On target
Total Income 443,718 443,044 (674) 1,131,992
Expenditure:
Staff costs (271,745) (228,752) 42,993 (199,588)
Realignment of project management budget to
Employee costs with the recruitment of Project Manager
post filled (vacant part-year)
Board Costs (15,000) (15,000) 0 (15,000)On target
Premises Costs (10,072) (10,583) (511) (10,594)
Operating Costs (127,000) (77,000) 50,000 (86,480)Realignment of project management budget to
Employee costs & underspend on professional fees
Running Costs (17,000) (17,000) 0 (6,644)On target
0 0 0 0On target
Total Expenditure (440,816) (348,334) 92,482 (318,305)
Net Surplus/Deficit 2,901 94,709 91,808 813,687
2025/26
Page 100 of 128

Page 101

Appendix 4 
0.000
1.000
2.000
3.000
4.000
5.000
6.000
7.000
8.000
9.000
Dec-
25
Jan-
26
Feb-
26
Mar-
26
Apr-
26
May-
26
Jun-
26 Jul-26 Aug-
26
Sep-
26
Oct-
26
Nov-
26
Dec-
26
Jan-
27
Feb-
27
Mar-
27
Apr-
27
May-
27
Jun-
27 Jul-27 Aug-
27
Sep-
27
Oct-
27
Nov-
27
Dec-
27
balance 6.649 6.774 7.708 7.284 6.520 5.744 4.774 4.398 3.658 4.054 4.516 3.861 3.201 3.303 3.341 3.304 3.407 3.408 3.410 3.324 3.325 3.326 3.198 3.199 3.200
Forecast Cash Balances to December 2027
Page 101 of 128

Page 102

Appendix 5
Fusion Assets – ALEO Review Action Plan (March 2026) 
Opportunities Identified Action  Responsibility  Work to date  Timescale
1 Council should explore
funding opportunities to
support delivery and
scalability of Fusion Assets 
Potential new funding stream to be identified
from Glasgow City Region as well as other
Scottish and UK initiatives such as National
Wealth Fund.
Managing
Director / NLC
Enterprise
Manager /
Board
£3.1m secured through City Deal’s
Enabling Commercial Space
programme. A further £8.187m
allocated to projects, subject to
approval of full business case. 
Exploring opportunities through the
UK Local Growth Fund
Ongoing - quarterly
review of funding
landscaping between
NLC & FA.
2 Fusion Assets & Council
develop Business Case to
explore other
opportunities beyond
industrial sector.
NLC have work ongoing looking at mid-market
housing which requires delivery vehicle to be
outwith Council. Fusion Assets may be suitable
to undertake this role or be involved.
May be other opportunities emerging from
NLC’s Business and Industry strategy once
completed.
Managing
Director / NLC
Enterprise
Manager /
Board
Following a review of the MMR
model, it has been agreed that an
alternative model of delivery will be
sought. 
FA engaged with NLC and
consultants in preparation of new
Business & Industry Strategy.
B&I Strategy background
paper was presented to
February 2026 EFW
Committee. Final
strategy and action plan
to be presented later in
2026. 
Area for future
Development
Action Responsibility Work to Date Timescale
3
Address Staffing and
Knowledge Risks.  
(a) Review resources and consider options to
increase capacity to enable future
expansion of activity. 
(b) Implement formal knowledge
management system and prepare
Business Continuity Plan.
Managing
Director / Board 
Managing
Director/Board
Project Manager appointed in
January 2026 to increase staff
resources and capacity. 
NLC passed on BCP template and
guidance for consideration and
incorporation into Corporate
Governance Manual. System to be
used to address succession planning
and knowledge sharing.
Complete 
Draft BCP to be
presented to Fusion
Assets Board  and
thereafter a testing
scenario carried out
annually.
4 Enhance Administrative
and Operational Resource 
Consider technology solutions to streamline
operations and improve efficiency
Managing
Director / Board 
Microsoft Project planner software
acquired along with Autocad LT and
Acrobat Pro. 
Complete 
Page 102 of 128

Page 103

Keep under review requirements for
additional admin or financial
resources. 
Investigate practicality of FA having
own email address and whether to
remain on NLC IT system. 
Annual Review
associated with SLA with
Finance. 
Initial meeting to be
arranged with IT to
review options.
5 Expansion of Service
Offerings and Expertise 
(a) Consider broadening the range of
development projects undertaken
including collaboration with NLC to
identify and strategic opportunities in
housing, retail, or mixed-use
developments. 
(b) Conduct a feasibility study to identify new
development projects, including
underutilised or strategically significant
properties. 
(c) Conduct a feasibility study for the
provision of consultancy services to other
public sector organizations or local
authorities lacking in-house expertise. 
(d) Establish partnerships with local
businesses, third-sector organisations, and
NL Properties LLP to leverage additional
resources and expertise.
Managing
Director / NLC
Enterprise
Manager /
Board
Priority sites to be identified and
investigated from ongoing work for
Business and Industry Strategy.
Fusion Assets previously worked
with SFT to replicate funding and
delivery model. 
Discussions ongoing to clarify who
relevant local stakeholders are to
allow FA to broaden its network of
contacts. 
B&I Strategy background
paper was presented to
February 2026 EFW
Committee. Final
strategy and action plan
to be presented later in
2026. Identification of
priority sites will follow. 
Position to be reviewed
in 6- 12 months to see if
any opportunities have
emerged from Glasgow
City Region. 
Meeting to be arranged
with NLC Estates and
NLP to discuss and scope
areas of opportunity.
6. Align more closely with
Strategic Objectives
(a) Review and update any memorandum of
understanding or service-level agreement
with North Lanarkshire Council to define
Managing
Director / NLC
Enterprise
(a) Fusion Assets operates through
individual grant agreements.
Progress is reported to
Report updated for May
2026 EFW Committee
and grant process and
Page 103 of 128

Page 104

expectations, objectives, and key
performance indicators (KPIs). 
(b) Strengthen alignment with key NLC
strategies, including The Plan for North
Lanarkshire and the Programmes of Work
including Transforming Places and Invest
NL. 
(c) Review current Performance
Management Framework to ensure
metrics reported clearly demonstrate
alignment with the Council’s priorities
including ERDP, Transforming Places
Programme of Work. 
(d) Strengthen oversight and monitoring
arrangements and ensure close alignment
with NLC’s strategic plan and programmes
of work. 
(e) Collaborate with NL Properties LLP to
define clear boundaries and roles for
commercial property rental activities
Manager /
Board
Committee on a biannual basis.
Reporting format currently
being reviewed by NLC. 
(b) FA business plan to incorporate
and reflect NLC priorities and
ensure alignment.  
(c) New Performance Management
Report being finalised. FA
outputs already captured in
update reports to ERDP Action
Plan, Transforming Places
Programme of Work and FA
Performance Monitoring Report
to EFW Committee. 
(d) Per (c) and FA will be
represented on Business and
Industries sub-group of
Transforming Places POW 
(e) Meeting to be arranged with
NLP to discuss.
legal agreements were
updated for VDLF and
Enabling Commercial
Space Programme. 
FA Business Plan due to
be updated in 2026. 
Business & Industry
Group will further review
performance
management framework
and monitoring
arrangements to align
with wider strategy. 
7 Amend Articles of
Association for Broader
Objectives 
Initiate a review of the current Articles of
Association to identify constraints and areas
for potential amendment
Managing
Director / Board 
Articles of Association are only likely
to need amended if company &
Council decide that Fusion Assets
should operate out with North
Lanarkshire. 
Requirement to be
monitored and reviewed
quarterly at Board
meetings, particularly in
relation to new
initiatives such as mid-
market rent. 
8 Branding and Digital
Presence 
(a) Update Fusion’s branding and website.  Managing
Director / Board 
New website launched at end of
March 2026.
Due to launch at end of
May 2026
Page 104 of 128

Page 105

(b) Develop a social media and digital
communications strategy to increase
visibility, engagement, and stakeholder
awareness. 
(c) Allocate resources for regular content
creation to keep stakeholders informed
and involved. 
Communications strategy to be
prepared targeting Fusion Assets
20th anniversary in 2026. 
Freelance marketing resource to be
retained for content creation,
events and publicity /stakeholder
engagement.
Draft to be presented by
September 2025 and
completed by December
Board meeting.
Focus to be on 2026 –
UKREiiF and 20th
anniversary of FA being
established. 
Page 105 of 128

Page 106

Page 106 of 128

Page 107

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    AG/PK Date 15/05/26 
Strategic Performance Framework - latest performance results for
Employability 
From  Alison Gordon, Chief Officer (Children, Families, Justice, and Integrated
Practice)  
E-mail GordonAl@northlan.gov.uk 
Executive Summary
Driving up the employment rate in North Lanarkshire is a cornerstone of The Plan for North
Lanarkshire’s vision for inclusive growth and prosperity for all people and communities in
our area. Providing an effective employability service is central to this and ensuring
employability support is available to all is recognised as a major contributor to both local
economic development and tackling poverty. 
Supporting unemployed and underemployed residents into fair and sustained employment
and supporting all young people into a positive destination remain a priority within
Education, Children and Families. The Strategic Performance Framework enables
progress against strategic priorities and day to day operations to be regularly reported to
service committees. This allows Elected Members to monitor, assess, and scrutinise
performance to identify areas requiring improvement and inform future decision making.
The report highlights the number of residents supported into employment in 2025/26 as
well as detailing the current employability challenges and highlights within local
communities. Alongside this, a range of annually measured indicators are available to offer
context on performance across a range of indicators. 
Recommendations 
It is recommended that the Enterprise and Fair Work Committee: 
(1) Review the high-level performance overview presented in Appendix 1 and identify
where further information is required to understand or investigate performance further. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Page 107 of 128

Page 108

1. Background 
1.1 There are six inter-related strategic frameworks which are key to evaluating the
success of The Plan for North Lanarkshire and assessing delivery towards achieving
the overall vision by ensuring each stage is appropriately aligned, planned, guided,
implemented, monitored, and governed.   
1.2 The six frameworks focus on ensuring a corporate one council approach in respect of
Policy, Governance, Performance, Self-Evaluation, Project Management, and
Demonstrating Improved Outcomes for Communities.   
1.3 The Strategic Performance Framework comprises performance measurement at three
levels.  This aims to collectively provide an overview of performance to help understand
the impact of council activities on improving services and outcomes for the people and
communities of North Lanarkshire.  The measures in this Framework allow for day-to-
day activities, and progress towards achieving the long-term vision set out in The Plan
for North Lanarkshire, to be regularly monitored, reported, assessed, and scrutinised.   
1.4 The Strategic Performance Framework is aligned to the Accounts Commission’
Statutory Direction which places a requirement on councils to ensure clear, balanced,
and effective reporting on how well services are performing that includes (i)
comparisons of performance over time and between councils, and (ii) shows how well
local outcomes are being improved. For information, the council’s comparative
performance in Local Government Benchmarking Framework (LGBF) indicators can be
viewed through the Improvement Service’s online dashboard: 
https://www.improvementservice.org.uk/benchmarking/explore-the-data   
1.5 A Performance Reporting Schedule supports the timely submission of a range of
performance information to ensure fully informed review, reporting, scrutiny, and
decision-making processes by Elected Members and senior management. This
Schedule, endorsed by the Audit and Scrutiny Panel each year, includes Chief Officer’s
individual Performance Reviews at Service Committees in line with the Strategic
Performance Framework. 
1.6 This report therefore presents the Enterprise and Fair Work Committee with the latest
performance results for the Employability function within the Children, Families, Justice,
and Integrated Practice service for Members’ further review and scrutiny. 
2. Strategic Performance Framework 
Enterprise and Fair Work Committee responsibilities 
2.1 In line with the terms of reference outlined in the Scheme of Administration, the
Enterprise and Fair Work Committee is responsible for monitoring and reviewing
performance information for the following Ambition Statements from The Plan for North
Lanarkshire.   
5. Grow and improve the sustainability and diversity of North Lanarkshire’s economy.
6. Raise attainment and skills for learning, life, and work to enhance opportunities
and choices. 
2.2 The high-level performance overview in Appendix 1 presents Members with a summary
of the latest results for performance indicators relating to the services that sit within the
remit of the Chief Officer (Children, Families, Justice, and Integrated Practice) in
Page 108 of 128

Page 109

relation to Employability. 
2.3 The information in Appendix 1 comprises the undernoted. Appendix 2 provides
additional context in respect of the council’s approach to the measurement of indicators
and setting of targets. 
• An ideal direction arrow - this indicates whether a higher or lower figure is the
preferred direction of travel.   
• Measurement unit - for example whether the result is a %, a number, a unit cost
(in £), or a ratio.
• Performance results for the most recent financial years (depending on availability
of data) along with the latest year’s target and corresponding RAG status (for
indicators where it is appropriate to set targets).   
• The most recent quarterly results, along with the corresponding target and RAG
status.  Note the inclusion of this information is dependent on the measurement
frequency of the indicator and availability of data as at the time of reporting. 
• A trend graph - this captures the direction of travel achieved over the years and
includes the most recent monthly or quarterly results where available.
• Comments - narrative summarising the current position and providing an
explanation for any significant variations in performance.  Where applicable, this
narrative also highlights any internal or external factors impacting on service
delivery as well as any residual effects of the pandemic, e.g. any increase or
decrease in the volume of transactions or enquiries processed. 
Current context 
2.4 The performance information presented in Appendix 1 should be considered within the
context of the following: 
The North Lanarkshire labour market reflects the national job market in that, while
recruitment has slowed in the last 12 months due to increased employer costs,
unemployment has remained relatively low. Indeed, unemployment in North
Lanarkshire has dipped below the Scottish average in a sustained way for the first time
in the last 6 months and is a demonstration of the longer term and sustained 
improvements that have been taking place in our local labour market as a result of the
general economy alongside the implementation of the Plan for North Lanarkshire with
effective business and employability support and excellent education and inclusion
services.    In addition, the longer term increase in average earnings in the area has
also contributed to the local economy. 
A very positive trend that has emerged in the last 12 months is a decrease in economic
inactivity levels in our communities. This had been a real concern in the post-covid
period when economic inactivity levels in North Lanarkshire were among the highest in
Scotland.  This trend in the last two years has seen North Lanarkshire move from
moving among the top 3 highest areas for economic inactivity in Scotland in 2024 to
now being 16th in Scotland, a significant improvement from 29.5% of the working age
population in March 2024 to 22.9% in the latest figures available (Scotland is at 22.7%). 
This is due to significant decreases in the number of people citing long-term sickness
 A higher figure is better
 A lower figure is better
Key to RAG status
Green Performance is on target and/or within acceptable thresholds
Red Performance does not meet target and is outwith acceptable thresholds
Blue Performance surpasses the target and exceeds expectations
Page 109 of 128

Page 110

or caring responsibilities as a barrier to work and coincides with an increase in the
number of economically inactive residents who say they do want a job increasing as
well.   
This is a very positive emerging trend in North Lanarkshire and employability
programmes will continue to promote themselves to this group alongside those who
are unemployed.  The increasing polarisation between those in work who are seeing
decent wage growth and some improvements in working hours and security and those
out of work who are facing the increased cost of living on benefits continues to grow
and makes the provision of employment to those not in work one of the key routes out
of poverty.  This polarisation around those in work and those out of the labour market
reinforces the Council strategy of working in a voluntary and supportive manner with
our residents who are unemployed or economically inactive and funding employability
programmes which deliver support to address barriers around health, wellbeing, and
money issues. These are provided alongside real vocational support in terms of training
and work experience to match our residents with the job that suits them and their
circumstances and include our area-based community engagement projects delivered
through Routes to Work Ltd and our Working for Families programme, which offers
support to parents on low incomes with a long term plan to get back to work. Cross
service work which includes whole family support, housing and tackling poverty
colleagues and other partners working together to support this group is now the norm
for employability programmes. 
Recent performance highlights 
2.5 North Lanarkshire Council funded employability programmes are benchmarked against
others in Scotland as part of the Local Government Benchmarking Framework and in
the latest snapshot for 2024/25 were third behind Eilean Siar and Fife Councils of all
32 local authorities in terms of supporting residents into employment. Alongside this in
2024/25 there has been an expansion and increase in reach of our Working for Families
programme which aims to attract low-income parents and the number of parents
supported has grown to become 66% of those supported.  Alongside this, Council
funded programmes are also supporting other priority groups such as people with long
term health issues (27%) and 50% of those supported overall live in our 20% least
prosperous datazones. 
2.6 In terms of the work to close the disability employment gap in North Lanarkshire, the
Supported Employment team continued to work with over 200 disabled people every
year using their person-centred model of support, with consistently higher rates of
employment sustainability at 6 months (79.4% in 2025/26) after job entry than
mainstream programmes. Alongside their work with adults, they continue to deliver
innovative support to young people with additional support needs leaving school and
transitioning into the job market with a similar programme for care experienced young
people.  These programmes are innovative and engage employers in a meaningful way
to employ young people with additional support needs or who have additional barriers
to securing employment. 
Areas of performance requiring improvement 
2.7  There are no areas of performance requiring improvement due to their RAG status but
while the number of economically inactive residents, particularly those with long term
health conditions, has decreased significantly it is an area that should have continued
focus and investment to sustain the improvements.   Alongside this, the participation of
young people aged 16-24 in the labour market is always an area for emphasis given
the importance of ensuring all young people have an opportunity to meet their potential
Page 110 of 128

Page 111

and the scarring effects that long term unemployment can have on their prospects.   
Next steps 
2.8 As noted in paragraph 1.5, the Strategic Performance Framework is supported by a
Performance Reporting Schedule. This sets out the arrangements for service, statutory,
and Strategic Performance Framework reporting to committee. In this respect the
relevant Committee can expect to receive the following reports relating to Employability
areas of work in 2026 to 2027. 
Report Description Committee Committee
cycle for next
report
Routes to Work -
performance and
finance report
Routes to Work, established in 2002, is a
company limited by guarantee with charitable
status which is wholly owned by the council. The
organisation provides a range of free
employability services to North Lanarkshire
residents and specialises in providing case
worker support to unemployed residents as well
as support with accessing vocational training and
the short-term costs associated with moving from
benefits to employment, such as childcare and
travel.
Latest report in November 2025: link to report
Enterprise and
Fair Work
Committee 
Cycle 2 and 4
in 2026 
3. Measures of success 
3.1 Measures of success include: 
• Regular oversight and monitoring of performance across the organisation to gain
assurances in terms of governance and accountability.
• Regular review and challenge processes to scrutinise the performance of the
council to ensure effective use of resources and that resources are directed in
accordance with agreed policy and according to priorities, while ensuring sound
decision making and clear accountability for the use of resources in achieving
improved outcomes for service users and the local community.  
• Performance monitoring, management, and reporting arrangements that support
the demonstration of improved performance in local services and outcomes, and
the delivery of Best Value. 
4. Supporting documentation 
Appendix 1      High-level performance overview. 
Appendix 2      Note for information in respect of performance indicators and targets. 
Alison Gordon
Chief Officer (Children, Families, Justice, and Integrated Practice) 
Page 111 of 128

Page 112

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
Page 112 of 128

Page 113

5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Monitoring and managing service performance supports the ongoing oversight of
the service’s risk register.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 113 of 128

Page 114

Appendix 1
Employability
High-level performance overview - as at April 2026
Note, for the majority of the benchmarking indicators the most up to date data that is available nationally relates to 2024/25
(https://www.improvementservice.org.uk/benchmarking/explore-the-data) 
Positive destinations - % pupils
leaving school and entering a
positive destination
CHN11
higher
figure is
better
% 94.3 92.2 94.5 94.2 94.7 94.2 93.9
n/a; indicator for
benchmarking
purposes only
n/a
The latest results show that the proportion of pupils leaving school in NL
and entering a positive destination is 93.9% - this equates to 3,384
leavers achieving a positive destination out of 3,605.  While this indicator
shows improvement from The Plan for North Lanarkshire baseline of
91.8%, the latest results are lower than the national average (95.7%) and
the family group of similar councils (94.6%).
Participation rate - % 16-19 year
olds engaged with an
organisation for the purposes of
learning, training, or work
CHN21
higher
figure is
better
% 90.1 90.7 91.5 90.2 91.0 91.9 92.2
n/a; indicator for
benchmarking
purposes only
n/a
Latest results for 2024/25 show 92.2% of 16-19 year olds in North
Lanarkshire are engaged in learning, training or work.  This is an increase
from previous years and is similar to the family group average of similar
councils (92.8%), and just below the national average (93.3%).
Employment support - %
unemployed people assisted
into work from council operated /
funded employability
programmes
ECON1
higher
figure is
better
% 25.3 21.6 12.9 35.0 20.4 21.9 23.7
n/a; indicator for
benchmarking
purposes only
n/a
Latest results show that 23.7% of people unemployed have been
supported into work through a council operated or funded employability
programme.  This is higher than the previous two years as well as the
national average of 14.2% and the average for the family group of similar
councils (21.9%).  NL has consistently remained in the top quartile out of
all 32 councils in Scotland for this benchmarking indicator.
Employment support - number of
people supported into
employment by the council
Pi026
higher
figure is
better
number 1,340 1,448 1,164 2,132 1,197 1,127 1,122 1,434 997 blue blue
The results reflect an effective year for NLC funded employability
providers, in particular Routes to Work Ltd.  The figure of 1,434 is a
significant increase on the previous year and due to a number of factors. 
One of these is the sustained and consistent level of external funding being
invested in employability by the Council and UK and SG Governments. 
The second is a result of applying the lessons learned in the previous year
of delivery of UKSPF and simplifying the delivery model but also focusing
on job outcomes for those engaged.
Employment support - % people
obtaining / sustaining
employment for 6 months or
more
Pi028
higher
figure is
better
% 78.6 70.0 71.0 70.0 76.0 75.7 75.9 71.0 70.0 green green
The consistently high levels of sustainment of those supported into
employment remain a reflection of the investment in support to those
residents who enter employment for up to 6 months after they start a job.
trend commentsIndicator id ideal
direction
unit of
measurem
ent
2018/19 2022/232019/20 2020/21 2025/26 target 2025/26 RAG status2021/22 2023/24 2024/25 2025/26
80.0
85.0
90.0
95.0
100.0
18/19 19/20 20/21 21/22 22/23 23/24 24/25
80.0
85.0
90.0
95.0
100.0
18/19 19/20 20/21 21/22 22/23 23/24 24/25
0.0
20.0
40.0
60.0
18/19 19/20 20/21 21/22 22/23 23/24 24/25
0
500
1,000
1,500
2,000
2,500
18/19 19/20 20/21 21/22 22/23 23/24 24/25 25/26
0.0
20.0
40.0
60.0
80.0
100.0
18/19 19/20 20/21 21/22 22/23 23/24 24/25 25/26
Page 114 of 128

Page 115

Employment support - % people,
with support needs, sustaining
employment for 6 months or
more
Pi027
higher
figure is
better
% 78.9 70.0 71.0 70.0 76.0 75.0 76.0 71.0 70.0 green green
A significant proportion of those supported by council employability
programmes identify need additional support for a range of reasons with
the most common being lack of work experience, health issues (both
physical and mental) and a lack of recent qualifications.  Sustain ment
levels are high and reflect the broader programme levels.
Supported enterprise service  -
% of people with supported
needs or barriers who
successfully obtained and
sustained employment for 6
months or more
Pi029
higher
figure is
better
% 84.6 85.1 89.1 86.9 74.2 89.3 81.8 79.4 70.0 blue blue
This indicator shows the continued effectiveness of the Supported
Enterprise Service and NL Industries in assisting people with additional
support needs and barriers to employment into work.  It demonstrates how
effective the supported employment process is in job matching and
delivering in work support to help job retention, i.e. from the outset in
supported employment there is a high investment of time and resource
into making sure the job is the right one for the circumstances.
Living wage - % of people (age
18+) in employment earning less
than the real living wage
ECON7
lower
figure is
better
% 20.5 19.3 15.8 14.9 8.8 11.4 11.4
n/a; indicator for
benchmarking
purposes only
n/a
This indicator measures the percentage of people in employment (age
18+) earning less than the real living wage.  It's based on a 1% sample of
the PAYE system which is undertaken by the Office of National Statistics. 
Figures are workplace based, so include all those that work in the council
area regardless of where they live. 
The latest results for this indicator show that 11.4% of people (age 18+) in
employment in North Lanarkshire are earning less than the real living
wage. This is similar to the national average (11.3%), and lower than the
average for the family group of similar councils (12.4%).
Out of work benefits - claimant
count as a % of working age
population
ECON12a
lower
figure is
better
% 3.9 3.7 6.5 4.0 3.5 3.4 3.2
n/a; indicator for
benchmarking
purposes only
n/a
Latest figures show the overall claimant count in NL is 3.2% in 2024/25 - a
steady decline over the years affected by the pandemic and not just a
return to pre-pandemic levels, but lower than this time. 
This is a similar position to the national average (3.1%) and the average
for the family group of similar councils (3.2%).
Out of work benefits - claimant
count as a % of the population
aged 16 to 24
ECON12b
lower
figure is
better
% 4.7 4.6 8.1 4.3 4.2 4.1 4.0
n/a; indicator for
benchmarking
purposes only
n/a
Latest figures show the overall claimant count in NL is 4% in 2024/25 - a
steady decline over the years affected by the pandemic and not just a
return to pre-pandemic levels, but lower than this time. 
This is higher than the national average (3.3%) but lower than the average
for the family group of similar councils (4.2%).
trend commentsIndicator id ideal
direction
unit of
measurem
ent
2018/19 2022/232019/20 2020/21 2025/26 target 2025/26 RAG status2021/22 2023/24 2024/25 2025/26
0.0
20.0
40.0
60.0
80.0
100.0
18/19 19/20 20/21 21/22 22/23 23/24 24/25 25/26
0.0
20.0
40.0
60.0
80.0
100.0
18/19 19/20 20/21 21/22 22/23 23/24 24/25 25/26
0.0
2.0
4.0
6.0
8.0
10.0
18/19 19/20 20/21 21/22 22/23 23/24 24/25
0.0
2.0
4.0
6.0
8.0
10.0
12.0
18/19 19/20 20/21 21/22 22/23 23/24 24/25
0.0
5.0
10.0
15.0
20.0
25.0
30.0
18/19 19/20 20/21 21/22 22/23 23/24 24/25
Page 115 of 128

Page 116

Appendix 2 
Note for information in respect of performance indicators and targets 
It should be noted that the nature of particular areas of service being measured in order to assess and manage performance do not always lend
themselves to a traditional approach to either measuring performance or setting targets, for example: 
• Some indicators (and targets) are required to monitor performance against a commitment or minimum standard the council has made in
advance to achieve a stated level of performance when delivering a service. 
• Some indicators (and targets) are required to assess compliance with legislative requirements.
• Some targets represent the level of performance that the council aims to achieve from a particular activity in either the short, medium, or long-
term.
• Some indicators are needed to help present a complete picture of performance in the round, as a single performance indicator used in isolation
rarely tells the whole performance story and a range of indicators are required to reflect the economic, efficient, and effective aspects of
demonstrating best value. 
• Some indicators and targets can help to support accountability to the public in terms of demonstrating best value and an efficient and effective
approach to the delivery of services. 
• Some indicators are monitored to ensure the council complies with specific requirements, such as information governance or health and safety.
• Some indicators are monitored to provide added context in order to help interpret performance results or supplement other existing measures.
Information such as this can be critical to enhance knowledge and decision making in terms of demand to help determine priorities and allocate
resources. 
• For some indicators it is not appropriate to set targets as it is the trend in the data (i.e. the direction of travel) that provides more meaningful
information to allow for an assessment in relation to whether performance has improved.
• Some indicators are national benchmarking indicators where their purpose is to allow for comparisons with other councils and the national
average.  These benchmarks are, in essence, can openers designed to focus questions on why variations in cost and performance are
occurring between similar councils.
• Some indicators are proxy measures, particularly in the case of measuring outcomes, as without directly measurable data for a desired outcome
the only alternative is to use a proxy that is an indirect measure of the desired outcome but which is itself strongly correlated to that outcome. 
Page 116 of 128

Page 117

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☐ Yes ☒ No
Ref: RAI S Detailed Design Date: 15 May 2026 
Contract Award for Ravenscraig Access Infrastructure South Detailed
Design 
From  Pamela Humphries, Chief Officer (Place) 
E-mail  Lyndsay Noble, noblely@northlan.gov.uk 
Executive Summary 
In accordance with the council’s General Contract Standing Orders (GCSOs), the Committee is
asked to acknowledge the award of a contract for Detailed Design work for Ravenscraig Access
Infrastructure South RIAS) (the ‘Agreement’) following the undertaking of a procurement procedure
as detailed within this report below. 
Given the value of the Agreement, permission to award out with the committee approval was sought
in accordance with GCSO 21.3.2 as the requirements within the Agreement are critical to maintaining
the Ravenscraig programme, managing project costs and coordination with other planned works by
the council on the road network and in the Motherwell area.   
Approval to award in accordance with GCSO 21.3.2 was received from the Depute Chief Executive
on 20 February 2026 and the Agreement was formally awarded on 27 February 2026. 
Recommendations 
It is recommended that the Enterprise and Fair Work Committee: 
(1) Acknowledges the award of the Agreement to AtkinsRéalis PPS Limited (the “Contractor”)
at the maximum value of Eight Hundred and Eighty Nine Thousand, Eight Hundred and four
Pounds Sterling and 98 Pence (£889,804.98) exclusive of VAT across the Agreements full
term which is made up of a period of nine months that commenced on 02 March 2026. 
The Plan for North Lanarkshire 
Priority Improve economic opportunities and outcomes 
Ambition Statement (5) Grow and improve the sustainability and diversity of North
Lanarkshire's economy 
Programme of Work Transforming Places 
Page 117 of 128

Page 118

1. Background 
1.1 The Ravenscraig Access Infrastructure South (RAIS) Project, forms part of the council’s City
Deal Programme, critically supporting the regeneration and redevelopment of Ravenscraig.
The infrastructure works create the road and public transport network required to support the
regeneration of the site and the development of a further 3,300 homes (in addition to the 900
already completed or under construction/approved) alongside over 160,000 square metres of
civic/community, office, retail, and employment development. 
1.2 The Ravenscraig Access Infrastructure South (RAIS) Project is one of two strategic projects
being delivered as part of the Pan Lanarkshire Transport Corridor. The Corridor will provide
a strategic north-south route between the M74 in the south to the M80 in the north. East
Airdrie Link Road forms the northern section of the Pan Lanarkshire Transport Corridor. 
1.3 The council wishes to appoint a multi-disciplinary project team to carry out further detailed
design building on the Value Engineering Review that was carried out by AtkinsRéalis UK
Limited for the project which identified opportunities to reduce costs, enhance functionality,
inform delivery phases, and improve constructability. 
1.4 The main requirements for the agreement are detailed in the Scope of Service with the
following high-level services being required: 
• Project Management. 
• Design Management. 
• Health and Safety Management, including acting as the Principal Designer under
the CDM Regulations 2015. 
• Risk Management, including Designers Risk Assessments, Risk Register – building
on those identified as part of the preliminary design. 
• A detailed Phased Construction Strategy and Delivery Programme. 
• Detailed cost estimates to be updated quarterly during the development of the detailed
design. 
• Carbon Management Plan further developed from the Value Engineering Review. 
• Roads design and associated disciplines, including traffic engineering, geotechnical/
geoenvironmental engineering, noise and air quality, pavement design,
structures, utilities, surface water drainage, and road lighting. 
• Identification of refresh or additional surveys or ground investigations to inform design
and construction phasing - provisional sums have been included for this activity. 
• Preparation and implementation of a Stakeholder Management Plan. Stakeholder
consultation including both statutory and non-statutory within the scope of the detailed
design stage. 
• Engage with Network Rail to manage the interface with the West Coast Mainline
Crossing. 
• Providing planning advice to the NLC RAIS Project Manager under the
current planning consent and, where relevant, prepare documentation to discharge any
relevant planning conditions under the existing planning consent. 
• Road Safety Audits – Stage 1 and Stage 2. 
1.5 The key objectives will be to develop a detailed design that can in time be tendered to deliver
the main works for the Ravenscraig Access Infrastructure to unlock the development potential
at Ravenscraig. In addition to minimise disruption to residents, businesses, and commuters
during construction; and help the council to identify opportunities to facilitate development
opportunities within Motherwell and Ravenscraig taking full cognisance of the recent transport
corridor work by the council’s Infrastructure and Transportation team. 
Page 118 of 128

Page 119

1.6 The procurement procedure was undertaken as a “Direct Award” from the City of Edinburgh
Consultancy Framework Agreement (the “Framework Agreement”) with Lot 11 Multidiscipline
Design Team Services being specifically used. 
1.7 Following the justification detailed and approved within the associated contract strategy
document, the Direct Award procedure was considered to demonstrate Best Value
as AtkinsRéalis UK PPS Limited has detailed pre-existing knowledge of the Agreement
requirements and NLC’s road network and importantly, wider current local network
knowledge relating specifically to design work on adjacent roads under recent contracts with
Infrastructure and Transportation. 
1.8 This will ensure project efficiency and advantage and allows for effective deployment
of directly related experience, skills and expertise from a multidisciplinary team who carried
out the Value Engineering Review and completed design work on the immediate road
network. This offers greater certainty of programme management and design interface.
Importantly, the outcomes of the recent Value Engineering Review and work packages
carried out by AtkinsRéalis UK Limited for Infrastructure and Transportation require to be
fully integrated into the RIA S Detail Design. 
1.9 Knowledge and direct access to the data, design parameters and appraisal work generated
from the areas of work above will allow for a seamless transfer of information and
understanding. These packages of works have significantly improved and advanced the
council’s understanding and further developed the requirements that RAIS needs
to consider. This will ensure the council can deliver and maximise the outputs and outcomes
as approved in the Outline Business Case for Ravenscraig Infrastructure. 
1.10 The Agreement will be funded by the Council’s City Deal Funding which comprises funding
from UK and Scottish Government and North Lanarkshire Council. This agreement is
essential to progress the delivery of the road infrastructure to enable the continued
regeneration of Ravenscraig. The previous RAIS Value Engineering Commission carried out
by AtkinsRéalis supports this agreement and the understanding and approach applied during
this work will maximise the outputs and outcomes from the Detailed Design agreement. 
1.11 Whilst the council has procured similar requirements in the past, the requirements specific to
this Agreement have never been contracted before by the council on this scale. 
1.12 To enable appropriate development and execution of the procedure required to form the
Agreement, a panel of technical and procurement representatives (the “User Intelligence
Group (UIG)”) was formed. 
1.13 The UIG were responsible for developing the required internal contract strategy (the “Contract
Strategy“) for the Agreement. The Contract Strategy sets out the parameters and approaches
the council would apply within the procurement, tendering, contracting and end of life stages
of the Agreement following appropriate analysis, research and investigation to ensure the
council achieves maximum benefit where possible. In accordance with GCSO 4.4, the
Contract Strategy for the Agreement was approved on 12 January 2026. 
2. Report 
2.1 The procurement procedure was undertaken as a “Direct Award”. A Direct Award is a
procurement procedure where an overarching framework agreement allows the council to
directly engage and contract with an appointed contractor that has already went through a
full competitive procurement procedure in a more efficient manner as per the framework
agreements terms and conditions. 
Page 119 of 128

Page 120

2.2 Within the associated Contract Strategy for the Agreement, the overarching framework
agreement and determination of whether Best Value was achievable via the Direct Award
procurement, the recommended Contractor was identified, engaged and issued an invitation
to tender to formalise the Agreement. 
2.3 The tender received from the recommended Contractor underwent appropriate appraisal to
ensure it was complete / compliant with the council’s requirements and demonstrated Best
Value. 
2.4 Appendix 1 provides a summary of the procurement procedure undertaken including the key
considerations and outcomes. 
Financial / Budget Consideration 
2.5 The pre-tender whole life estimate budget for the Agreement was £920,000.00 The costs
associated with delivery of the Agreement will be contained within the council’s City Deal
budget which combines funding from UK and Scottish Governments and North Lanarkshire
Council for the City Deal and Regeneration team within Place. 
2.6 The pre-tender whole life estimate was £920,000.00.  Following the procurement process,
the contract, subject to approval, totals £889,804.98.  This presents a £30,195.02 reduction
and alleviates the burden on the overall project budget.    This award value also includes
provisional sums which may not be required. 
Price Stability 
2.7 The pricing mechanism is a Fixed Priced Contract with an agreed Scope of Services and an
associated Activity Schedule offering a good level of cost certainty. 
Community Benefits 
2.8 The council is committed to maximising the delivery of community benefits. The procurement
included a community benefit requirement, this approach is designed to deliver local
community benefits where possible. 
2.9 Within their tender, the recommended Contractor committed to deliver community benefits
as detailed within Appendix 1 of this report: 
2.10 The community benefits committed as part of the Agreement does not include the creation of
jobs or apprenticeships.  
Fair Work First and Payment of the Living Wage 
2.11 Within their tender submission to obtain appointment to the overarching framework
agreement the recommended Contractor intimated that they would commit to the following
areas of the Scottish Governments “Fair Work First” initiative: 
• Within their tender submission, AtkinsRéalis PPS Limited confirmed that they will comply
with the CEC Framework Fair Work Practices, the principles of the Scottish
Page 120 of 128

Page 121

Government’s Fair Work First Initiative and will be applied to all staff involved in the
delivery of the contract. 
2.12 Further information on the Living Wage status of the recommended Contractor is detailed in
Appendix 1. 
Contract Management 
2.13 Officers from the City Deal and Regeneration team within Place will be responsible for
managing the Agreement which will be undertaken in accordance with the contract and
supplier management conditions applied within the Agreement. 
3. Measures of success 
3.1  The Agreement will deliver the following outcomes; 
• Detailed Design for RAIS 
• A detailed Phased Construction Strategy and Delivery Programme 
• Detailed cost estimates 
• Carbon Management Plan further developed from the Value Engineering Review 
• Stakeholder Management Plan. 
• Road Safety Audits – Stage 1 and Stage 2. 
3.2 Best Value will be demonstrated as outlined in Appendix 1; 
3.3 The Agreement is essential to facilitate the delivery of strategic road infrastructure to enable
forming an important part of the Pan Lanarkshire Transport Corridor and will significantly
improve north and south connectivity facilitating the realisation of associated economic
benefits. Critically, it removes the infrastructure barriers to the redevelopment of the former
Ravenscraig site. 
4. Supporting documents 
Appendix 1 Summary of Procurement Procedure 
Pamela Humphries 
Chief Officer (Place) 
Page 121 of 128

Page 122

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Glasgow City Region Cabinet has agreed that Inclusive Growth is to be fully
embedded within the GCR City Deal programme delivery and that it is also committed to
supporting the delivery of the Fairer Scotland Action Plan.  The
Outline Business Case/Full Business Case for the Project ensures it meets the duties of
the Fairer Scotland Action Plan.   
  
An Equality Impact Assessment has been undertaken for the Project and will remain under
development as the RAIS Project progresses.    
  
The review and relevant design work generated by the Value Engineering Review will be
built on by the Detailed Design work to ensure the Equality Impact Assessment is fully
considered particularly around access for pedestrians. Identified user groups within the
Equality Impact Assessment will aid in informing and confirming the design work as part of
the Agreement to support access for all.   
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The costs of the agreement will be fully met by the approved budget for the Ravenscraig
Access Infrastructure South Project as part of the NLC City Deal Programme. The Project
has an approved Outline Business Case. 
The financial implications of the City Deal Programme will be considered within the
council’s Long-term Financial Plan. To date budgetary implications over the next 5 years
have been approved by the Policy and Strategy Committee.   
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☒  
Page 122 of 128

Page 123

If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic?  
Yes ☐ No ☐  
If Yes, please provide a brief summary of the impact? 
All procurement procedures will have potential legal implications however throughout this
Agreement, compliance with the councils General Contract Standing Orders and the
relevant procurement regulations has been maintained with advice from colleagues in
Corporate Procurement and Legal Services sought as and when required. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data? 
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-mailed
to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
All infrastructure projects developed by the council as part of the GCR City Deal will be
subject to relevant environmental and sustainability appraisal and as part of the design
process and relevant statutory and technical approvals and related procurement.     
 
  
Furthermore, to adhere with HM Treasury Greenbook best practice, each iteration of the
RAI S project business case seeking GCR City Deal funding (for RAIS –
Full Business Case) will include a review of the sustainability considerations, this will
include carbon management, involving categorisation, assessment and mitigation.  
Carbon categorisation has been undertaken for RAI S and is reported to the GCR
through quarterly Project Status Reports.   
Carbon Management was integrated into the Value Engineering Review and the
development of this through Detailed design will ensure a robust Carbon Management
approach in line with GCR and Scottish Government Guidance. 
Page 123 of 128

Page 124

The consultant will be required to comply with the Councils and GCR City Deal policies,
including the Scottish Government’ current guidance for Scottish City Region and
Regional Growth Deals – Carbon Management guidance for Projects and Programmes.   
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The RIA S project team will engage with corporate communications on carrying out any
public consultation on the detailed design and on wider RIAS project matters. 
Any communications with members or local communities will be carried out by the project
team and supported by Corporate Communications. 
The City Deal and Regeneration Manager has regular communication meetings with the
corporate communications team for the City Deal programme.   
It should be noted that much of the communication on the RIA S will be on the wider
project and not solely focused on the technical requirements of this agreement.
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts, highlighting
where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk
Registers), and how they are managed? 
A risk assessment has been carried out for the delivery of this Agreement and recorded
as part of the approved Contract Strategy. 
In addition, a RAIS Project risk register has been developed for the whole project in line
with the Glasgow City Region Assurance Framework and associated Project
Management Framework. 
The key risk highlighted is risk to the City Deal Funding if the Agreement is not in put in
place or not put in place in a timely manner as it will have a significant impact on the ability
to deliver the project. The time saving is of particular importance to the externally funded
city deal programme and associated funding approvals.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does
it relate to healthcare, housing, or education services for in-Service or ex-Service
personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to ensure
there has been appropriate consideration of the particular needs of the Armed Forces
community to make sure that they do not face disadvantage compared to other citizens in
the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service delivery,
policy, or plan that has an impact on children and young people up to the age of 18, or on
a specific group of these? 
Yes ☐ No ☒ Page 124 of 128

Page 125

If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles from the
United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been carried
out? 
Yes ☐ No ☐  
Page 125 of 128

Page 126

Appendix 1 – Summary of Procurement Procedure 
Overview
Reference NLC-SLP-25-092
Title Ravenscraig South Access Infrastructure – Detailed Design 
Classification Services - Standard
Responsible Chief
Officer and Position Pamela Humphries, Chief Officer, Place 
Competition
Governance by Value Overarching Framework Agreements terms and condition in accordance with the Councils General Contract
Standing Orders
Route to Market Direct Award from a Third-Party Framework Agreement
Framework Agreement
Title, Ref and Lot Info City of Edinburgh Consultancy Framework, Lot 11 Multidiscipline Design Team Services 
Interest No. of Lot / Framework
Agreement Appointments  11 Date ITT Package Issued
(If Applicable) 14 January 2026
Direct Award Basis Best Value Assessment of Framework Contractors in Accordance with the Framework Agreement
How Has “Best Value”
Been Demonstrated?
• A single consultant driving the delivery of this project along with the above will ensure that there is a
seamless interface, significantly reducing the risk of abortive design and any associated delays to
programme that could potentially lead to increased costs.   
• A detailed knowledge and understanding from the Value Engineering Review and Infrastructure and
Transportation work packages taking a full corridor approach can be adopted integrating the proposed
RAIS new road infrastructure into the wider Motherwell Road network maximises the opportunities for roads
design and maintenance solutions to be achieved, creating efficiencies not only within this commission but
also enhances the opportunities for efficiencies in design and management along the whole corridor and
wider area.  
• The proposed direct award offers time and resource savings in procurement and programme management
within the council.    
• The time saving is of particular importance to the externally funded city deal programme and associated
funding approvals.  
• The time saving is of significant benefit regarding enabling existing surveys and design work to
be deemed relevant and allow for critical review in light of the more recent studies along the corridor which Page 126 of 128

Page 127

will reduce the need for repeating requirements unnecessarily and limit duplication
and consequently minimise any additional cost implications.   
• This robust process will derisk the project and provide the council with greater cost and programme
certainty.   
▪ Knowledge and direct access to the data, design parameters and appraisal work generated from the series
of work packages will allow for a seamless transfer of information and understanding.  
▪ The pre-tender whole life estimate was £920,000.00. Following the procurement process, the contract,
subject to approval, totals £889,804.98. This presents a £30,195.02 reduction and elevates the burden on
the overall project budget. This award value also includes provisional sums which may not be required. 
See RAIS Contract Strategy for full details. 
Additional Comments / 
Award Details
General Overview Total / Maximum Value £889,804.98 Contract Duration
(Months) 8 months 
Contractor Registered
Name(s) AtkinsRealis PPS Limited 
Contractor Overview Registered Local Authority
Area Glasgow  Contractor(s) Size Medium
Living Wage Paying the Living Wage Yes Living Wage Accredited Yes
Overview of
Community Benefits
Mandatory community benefits have been identified that are proportionate to the contract and will form part of the
contractual obligations and be in line with Glasow City Region Sustainable Procurement Strategy and buyers
guide as confirmed by City of Edinburgh Council. 
The outcomes will consist of: -
• 4 Work Experience placements, 
• 1 careers event and 
• £2000 financial contribution to a local community group. 
Additional Comments Community Benefits will be managed and monitored by the City Deal and Regeneration team in line with the
Glasgow City Region Procurement Strategy and Community Benefits approach.  Page 127 of 128

Page 128

Impacts
Summary,
Public Sector
Equality Duty
and Fairer
Scotland Duty
☒ HR Policy
Impact ☐ Data Protection
Impact ☒ Environment /
Carbon Impact ☒ Risk Impact ☒
Children’s
Rights and
Wellbeing
Impact
☐
Financial
Impact ☒ Legal Impact ☐ Technology /
Digital Impact ☒ Comms impact ☒ Armed Forces
Covenant Duty ☐ 
Page 128 of 128