Clerk Name: Clare Louise McDonald
Clerk Telephone: 07350 435308
Clerk Email: committee@northlan.gov.uk
20 August 2025
Members of the
Enterprise and Fair Work Committee
Chief Executive’s Office
Rachel Blair
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk
Notice is given that a Meeting of the Enterprise and Fair Work Committee is to be held in
the Council Chamber, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on Friday, 29
August 2025 at 10:00 AM which you are requested to attend.
The agenda of business is attached.
Rachel Blair
Chief Officer (Legal & Democratic)
Members :
A McVey, F McKay, M Boyd, A Bustard, J Cairns, D Crichton, G Currie, P Di Mascio, K
Docherty, A Duffy-Lawson, H Dunbar, W Goldie, H Gray, A Khan, J Leckie, F MacGregor, A
Masterton, B McCulloch, M McPake, L Mitchell, L Nolan, G Robinson, R Sullivan, A
Thomas, C Williams.
Page 1 of 128

Page 2

Page 2 of 128

Page 3

Agenda
1 Declarations of Interest In Terms of the Ethical
Standards In Public Life Etc. (Scotland) Act 2000
Operational
2 City Deal Programme Update
Submit report by the Chief Officer (Place) informing of
the current status of North Lanarkshire City Deal
Infrastructure Programme and its subprojects.
5 - 16
3 North Lanarkshire Town Centre Retail Business
Fund
Submit report by the Chief Officer (Place) seeking
approval to introduce the pilot grant funding
programme 'North Lanarkshire Town Centre Retail
Fund' during 2025/26, to support businesses located
within North Lanarkshire's town centres.
17 - 24
4 Environmental Key Fund Update
Submit report by the Chief Officer (Place) providing an
update on the delivery of the Environmental Key Fund
(EKF) and Blacklaw Windfarm Community Benefit
Funds, received from Scottish Power Renewables.
25 - 34
5 Economic Regeneration Delivery Plan and
Performance Framework – Annual Progress Report
Submit report by the Chief Officer (Place) providing an
update on progress made  towards the implementation
and delivery of North Lanarkshire's Economic
Regeneration Delivery Plan (ERDP) and associated
Action Plan.
35 - 84
6 North Lanarkshire Employer Charter
Submit report by the Chief Social Work Officer
(Education, Families, Justice and Integrated Practice)
highlighting the work of North Lanarkshire Employer
Charter.
85 - 94
Page 3 of 128

Page 4

7 UK Shared Prosperity Fund Employability
Programmes
Submit report by the Chief Social Work Officer
(Education, Families, Justice and Integrated Practice)
detailing the implementation and performance of the
UK Shared Prosperity Fund employability programmes
delivered over 2023/24 and 2024/25 and how this
supports the design and delivery of the current
programme.
95 - 102
Performance
8 City Deal Programme – Community Benefits
Delivery Update
Submit report by the Chief Officer (Place) providing an
update on the delivery of community benefits related to
the City Deal Programme over financial year 2024/25.
103 - 112
9 Lanarkshire Business Gateway – Performance
Report
Submit report by the Chief Officer (Place) providing an
overview of the activities and performance achieved
during the first year of an in-house delivery model of
the Business Gateway Lanarkshire service.
113 - 124
Contracts
10 Contract Awards Below Committee Approval
Threshold
Submit report by the Chief Officer (Assets and
Procurement) advising of the contracts awarded since
the last meeting of the committee.
125 - 128
Page 4 of 128

Page 5

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    LN/PH Date 29/08/25 
City Deal Programme Update 
From  Pamela Humphries, Chief Officer (Place)  
E-mail NobleLy@northlan.gov.uk Telephone Lyndsay Noble 
07970 016256 
Executive Summary 
The North Lanarkshire City Deal Programme Update Report seeks to inform the Enterprise
and Fair Work Committee of the current status of North Lanarkshire City Deal Infrastructure
Programme and its subprojects.       
Recommendations
It is recommended that the Committee: 
(1) Acknowledges the status and recent progress of North Lanarkshire City Deal
infrastructure subprojects and revised Programme. 
(2) Agrees to support the submission of the Ravenscraig Phase 1 Enabling Commercial
Spaces Project to the Glasgow City Region Director of Regional Economic Growth
for approval. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (5) Grow and improve the sustainability and diversity of North
Lanarkshire's economy
Programme of Work Transforming Places
Item 2
Page 5 of 128

Page 6

1. Background 
1.1 The Glasgow City Region (GCR) City Deal is an agreement between the UK and
Scottish Governments and the eight GCR Local Authorities, with the sole focus of
creating additional economic growth.  The 20-year GCR Deal was accepted by GCR
Council Leaders on 20 August 2014 and incorporated: 
• implementing a £1.13bn Infrastructure Fund to improve the regional transport
network, regenerate sites for economic use and improve public transport
provision;
• supporting growth in the life sciences sector;
• helping small and medium enterprises to grow and develop;
• establishing programmes to support the unemployed; and 
• piloting new ways of boosting the incomes of low wage employees.   
1.2 As Committee is aware, a strategic review and prioritisation of all projects within the
North Lanarkshire City Deal programme has been carried out and formed part of the
consideration of the council’s Strategic Capital Investment Programme 2024/25 to
2028/29 approved by Policy & Strategy Committee on 14 March 2024.   
1.3 The review of City Deal Programme was to ensure the Programme remained fit for
purpose and aligned to the Plan for North Lanarkshire and Programmes of Work and
to manage project delivery and, importantly, to assess cost pressures on the projects.
Following Committee approval in May 2024 and Glasgow City Region Cabinet approval
in August 2024, the revised Programme now allows for a stronger focus on strategic
connectivity, and new road infrastructure to enable regeneration and development. 
1.4 The City Deal Programme for North Lanarkshire, as part of the infrastructure fund
comprises the following sub projects:
• A8/M8 Corridor Access Improvements
o Strategic Active Travel 
o Orchard farm Roundabout
• Glenboig Link Road (complete)
• Pan-Lan Orbital Transport Corridor
o East Airdrie Link Road
o Ravenscraig Access Infrastructure South (Motherwell to Ravenscraig
and Airbles Road Improvements)
o Motherwell Town Centre Transport Interchange (complete) 
2. Report 
East Airdrie Link Road 
2.1 As Committee is aware, the East Airdrie Link Road (EALR) will provide a new strategic
link between the M8 and south of Cumbernauld.  The proposed link road will also
provide access to the Monklands Replacement Hospital at Wester Moffat, Airdrie.  The
EALR project team continue to liaise with NHS Lanarkshire through regular technical
meetings and a Project Interface Board provides governance around coordination,
manage risk, secure efficiencies, and maximise benefits.   
Page 6 of 128

Page 7

2.2 With the approval of the EALR Outline Business Case in August 2024 and the project
in DMRB Stage 3 (preliminary design and planning), the agreed programme is
progressing at pace with the final road alignment design being concluded by the end of
2025. Engagement with stakeholders, survey work and further design, has allowed a
greater focus on the positioning of the road structures, better integration of the new
road with local roads, and importantly, more refinement of the alignment to lessen the
impact on land, ecology, landscape and woodland.  The current road proposal now
comprises a well-defined road alignment including structures, associated road
infrastructure and interfaces with the local road network.   
2.3 An additional access to the proposed hospital at Wester Moffat, namely the Towers
Road link, has been identified by the council and NHS Lanarkshire as an option that
offers the Monklands Hospital and the EALR significant benefits. The Policy and
Strategy Committee (June 2025) approved the inclusion of the Towers Road link into
the wider East Airdrie Road Link Project (subject to conclusion of viability assessment
and funding).   
2.4 This link from Towers Road to the EALR offers additional construction access to both
projects, provides a corridor for some of the hospital’s public utilities but more
importantly, will create a second permanent direct route to the hospital for patients,
staff, public transport, active travel and emergency services and a valuable east west
link for the EALR to enhance the connectivity to the local road network. The Towers
Road link also benefits the immediate local road network with road improvements to
Towers Road. The link would divert hospital-related traffic away from other local roads,
with the potential to relieve pressure on existing junctions in particular at the A89. 
Detailed traffic modelling is taking place and will form part of the Environmental Impact
Assessment supporting the Planning Application. 
2.5 A Pre-Application Notice (PAN) for the EALR was submitted in May 2025, in advance
of the planning application for the Link Road proposal being submitted late 2025. The
statutory consultation which comprised the EALR including the Towers Road Link, as
part of the PAN, has taken place over summer with a second consultation planned for
autumn 2025.  The in-person consultation was well attended and provided an
opportunity for the project team to discuss the latest proposals with local residents,
landowners and other interested parties. The 3 in person consultation events were
supported by an online consultation that ran for 8 weeks between 16 June and 10
August 2025.  Both have allowed further consultation on the proposed road alignment
and comments to be considered and incorporated into the design where possible. 
2.6 The outcome of the Pre Application Notice and Pre Application Consultation will lead
to a third and final road alignment design being concluded to allow for the submission
of the planning application. 
2.7 To support the design work and planning application, environmental surveys continue
to take place across the extent of the proposed link road.  Additional Ground
Investigation work will take place from August to November 2025 to confirm the final
design and structure locations.  It will also inform the construction methodology for the
link road and provide further certainty of construction costs and overall project budget. 
2.8 As reported previously, the council will require to acquire the land to construct the
EALR.  As the road alignment becomes finalised, this allows the land take required to
be better understood and for the land strategy to be implemented.  Given the scale and
length of the EALR, the number of landowners is substantial and the risk of acquiring
Page 7 of 128

Page 8

all the land at the same time is considered by the EALR project team to be of a level
that will require a compulsory purchase order (CPO).   
2.9 It is intended to bring further information back to Committee on the land strategy
including the potential for voluntary acquisition and CPO for the EALR.  In time, a
proposal for consideration and approval to promote a CPO for the necessary land for
the link road delivery would be submitted to this Committee. 
Ravenscraig Access Infrastructure 
2.10 As committee is aware, the Ravenscraig Access Infrastructure project, following the
removal of the RAI N sub project, now comprises 2 sub projects: 
• a new road connection between Motherwell and Ravenscraig from Airbles Road,
passing under the West Coast Main Line railway, and on to the Regional Sports
Facility 
• completing the dualling of Airbles Road between Airbles Farm Road and Hamilton
Road and improving facilities for pedestrians and cyclists.   
2.11 The first phase of work comprised the demolition of the buildings acquired for the road
scheme – at Manse Road (formerly Cook & Indis and Yesss Electrical), the former
Evans Halshaw dealership and the adjacent vacant commercial unit at Windmillhill
Street.  The demolition works are now complete, and the sites have been secured.   
2.12 With the former Evans Halshaw site being cleared, a temporary car park for North
Lanarkshire Council employees has been created.  This parking facility (in the region
of 100 spaces) provides much needed car parking for the council. It is proposed that it
will be available for approximately 18 months.  Providing this temporary car parking
arrangement, should take the pressure for parking away from local residential streets
and town centre car parks.  This car park however will be removed when the site is
needed for the link road into Ravenscraig. 
2.13 A Value Engineering Review has taken place to ensure the design and layout of the
Motherwell to Ravenscraig road link remains fit for purpose and links in with ambitions
across the road network especially the Motherwell to Ravenscraig and Wishaw
Corridor, and to where possible, improve drainage provision to support wider
development opportunities for Motherwell and Ravenscraig.  The Review was also an
opportunity to examine the design and construction methods to manage costs and
where possible create efficiencies in the delivery phases to minimise disruption and
impact on the town centre. 
2.14 The Value Engineering Review has identified the need for further design work to
maximise the infrastructure.  The detailed design will allow us to progress the main
works contract and form the basis for taking forward the enabling works.  As reported
previously the enabling work comprise accommodation works, service diversions and
land remediation within Ravenscraig.  Further information on the detailed design will be
reported to future committees. 
2.15 Environmental and geotechnical surveys have been commissioned to build on the work
to date and support the detailed design and delivery of the works.  It is also intended to
commission noise and air quality surveys. 
Page 8 of 128

Page 9

2.16 It is also intended to carry out a public consultation in late August/September on the
proposed changes following the Value Engineering Review.  This builds on the local
member briefing that has taken place prior to summer.   
2.17 This RAI S programme will be continuously reviewed and updated.  The programme
for the proposed remaining works phases currently is: 
• Enabling works - November 25 to September 2026 
• Main Works – October 2026 to August 2027 
2.18 These dates may change to allow for further design work, to facilitate the efficient
delivery of the enabling works and main works and to co-ordinate with other planned
works within Motherwell to minimise disruption.  Committee will be updated of any
changes to the programme in due course.   
2.19 Design work will continue for the Airbles Road Improvements with the delivery of the
works now programmed for February 2028 to March 2029 as per the approval at the
May Committee 2024.   
A8/M8 Corridor Strategic Active Travel 
2.20 2.3.1 The provision of 10km of Strategic Active Travel Links, connecting
Eurocentral/Maxim Office Park/Newhouse and Mossend to surrounding local
communities and local rail stations was approved by GCR Cabinet on 30 August 2022
as the new preferred option for the Eurocentral sub-project.   
2.21 The routes identified are to the south of Eurocentral between Bellshill Rail Station/town
centre and the M8 cycle route at North Road; Bellshill town centre, Mossend and
Holytown, connecting into Eurocentral from Holytown and between Holytown and
Newhouse. 
2.22 To the north of Eurocentral, a route has also been identified from Whifflet rail station to
the M8 cycle route at Shawhead. These routes are designated as Strategic Network
Routes within the North Lanarkshire Active Travel Strategy. 
2.23 The routes importantly link with other planned active travel route improvements as part
of the East Airdrie Link Road project and with other projects under the Active Travel
Strategy being taken forward by the Infrastructure and Transportation team. 
2.24 Due to the scale of the project, a phased approach will be taken to design and delivery.
Detailed design work is well under way and will be progressed over 2024 and 2025. 
2.25 The delivery programme has been adjusted to take into account the need to undertake
additional topographical survey work to ensure detailed design information is robust
prior to issue of works tenders. Subject to Committee agreement, it is now proposed to
submit a first phase Full Business Case in April 2026.  It would be intended to
commence construction in June 2026, with completion of the first phase of work by
November 2026.   
Enabling Commercial Spaces Project (ECSP) 
2.26 As Committee agreed in May 2025, £11,287,602 of City Deal funding through the
Glasgow City Region (GCR) Enabling Commercial Spaces Programme was allocated
to support projects at Ravenscraig and Westfield Point, Cumbernauld to be delivered
Page 9 of 128

Page 10

by Fusion Assets.  It has now been confirmed by the GCR that both these projects can
proceed to Full Business Case.  This funding is to support economic growth by
addressing market failure, creating flexible business space, providing opportunities for
employment and attracting inward investment. 
2.27 It is proposed to take forward the overall North Lanarkshire Enabling Commercial
Space project in 3 sub projects - Ravenscraig phase one and two and Westfield Point. 
The 3 sub projects will be submitted as 3 separate Full Business Cases.  This approach
has been adopted by other City Deal projects and aids programme, cost and risk
management.   
2.28 To secure approval to move forward with the main works of the Phase 1 Ravenscraig
ECSP a Full Business Case (FBC) is now being prepared and will be required to be
submitted to the Glasgow City Region.  Ravenscraig Phase 1 comprises new build
construction of 2 buildings totalling 29,210sq ft.  The detail design is underway and
subject to FBC approval, it is proposed that the works would commence in January
2026 and anticipated to be complete by February 2027. 
2.29 It is proposed to submit the Ravenscraig phase 1 FBC to the GCR Project Management
Office for evaluation and, subject to a positive recommendation, approval by the
Director of Regional Economic Growth under delegated approval arrangements in
Autumn 2025.  Committee is therefore asked to support the submission of the FBC
which will reflect the previously reported scope, timescales and estimated works value
of up to £4.5m.  It is proposed that c£3m of the £11.2m of City Deal Funding is allocated
to Ravenscraig phase 1 and supplemented by £1.4m of VDLF. 
2.30 Ravenscraig Phase 2 and Westfield Point Full Business Cases will follow over 2026
and 2027 respectively.  Agreement will be sought from Committee for submission to
the Glasgow City Region in due course. 
3. Measures of success 
3.1 The North Lanarkshire City Deal Programme construction timescales have been
updated following a programme review and approval of the Strategic Capital
Investment Programme are as follows (construction only): 
Glenboig/Gartcosh Community Growth Area: 
• Glenboig Link Road – May 2017 to June 2018 (complete) 
Pan Lanarkshire Orbital Transport Corridor: 
• Muir Street – January 2022 to June 2023 (complete) 
• Ravenscraig Access Infrastructure – March 2022 to March 2029 (no longer
including RAI N but including the reprofiling of Airbles Road) 
• East Airdrie Link Road – May 2028 to Sept 2030 
A8/M8 Transport Corridor: 
• Orchard Farm Roundabout – October 2026 to October 2027  
• Eurocentral Strategic Active Travel – June 2026 – August 2027 (delivered in
phases) 
Page 10 of 128

Page 11

3.2 The Programme and its sub projects have been developed to ensure that at a North
Lanarkshire level, North Lanarkshire’s residents and businesses will directly benefit.  
3.3 Each project at Outline Business Case stage and sub-project at Full Business Case
stage has to demonstrate how it will deliver the direct and indirect benefits.  As part of
the business case process, through the Economic Impact Assessment, outputs and
wider benefits are identified and are set out in a Benefits Realisation Profile.  The
Business Cases identify the economic impacts and the Benefits Profile quantify and
details when outputs will be delivered and achieved as a result of the specific project
investment.  
3.4 The benefits will be measured over a 10-year period, reporting as part of the GCR
Gateways until 2035.  Gateway 2, an onerous review of the completed GCR projects
and their outputs and outcomes has concluded successfully which allows for the next
5-year tranche of funding to be released.   
3.5 All North Lanarkshire City Deal contracts seek to maximise community benefits from
contracts awarded for the Project. Community Benefits will be secured through the
procurement of services and works in line with the City Deal Community Benefit
Strategy. The Community Benefits will be delivered through the design, planning and
implementation phases, through contracts directly awarded by North Lanarkshire
Council and where relevant, its partners. The Community Benefits menu within the City
Deal Community Benefits Strategy will be used to target benefits that support the
Council’s key aims and objectives and deliver against priorities.   
3.6 The type and number of community benefits to be delivered at a project and contract
level will be determined with reference to the nature and duration of each contract and
supplier. Community benefit outcomes for the Project will be linked to the Council’s
Single Outcome Agreement and Corporate Outcomes and the relevant local outcomes
which underpin these at a Service level. 
4. Supporting documentation 
4.1  No Supporting Documents. 
Pamela Humphries 
Chief Officer (Place) 
Page 11 of 128

Page 12

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The City Deal Cabinet has agreed that Inclusive Growth is to be fully embedded
within the GCR City Deal programme delivery and that it is also committed to
supporting the delivery of the Fairer Scotland Action Plan.  Future NLC subproject
OBC/FBC development will be scrutinised to ensure it meets the duties of the
Fairer Scotland Action Plan. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Following Committee approval (May 2024) and GCR Cabinet Approval on 6 August
2024, the revised North Lanarkshire Glasgow City Region City Deal Programme is
as follows: 
• Glenboig Link Road                                                         £6.2m
• A8/M8 Corridor Access Improvements
o Orchard Farm                                                          £2.2m
o Eurocentral Active Travel                                        £4.3m
• Pan-Lan Orbital Transport Corridor
o East Airdrie Link Road                                  £185.3m
o Muir Street                                                              £3.8m
o Ravenscraig Access                                               £74.2m
Infrastructure                                                            
• Total                                                                                   £276m 
This is funded £149m by the GCR City Deal Infrastructure Fund and £127m by
North Lanarkshire Council. 
The financial implications of the City Deal Programme will be considered within the
council’s Long-term Financial Plan. To date budgetary implications over the next 5
years have been approved by the Policy and Strategy Committee. 
Page 12 of 128

Page 13

5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The City Deal Team work closely with Legal Services on all sub projects focusing
on land acquisition and CPO, procurement and contract preparation and
management, funding agreements and any other related matters. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
All infrastructure projects developed by the council as part of the GCR City Deal will
be subject to relevant environmental and sustainability appraisal and as part of the
design process and subsequent planning application approvals and procurement.   
Page 13 of 128

Page 14

Furthermore, to adhere with HM Treasury Greenbook best practice, each iteration of
project business case seeking GCR City Deal funding will include a review of the
sustainability considerations, this will include carbon management, involving
categorisation, assessment and mitigation. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The City Deal programme and the delivery of the projects will continue to be
promoted through Corporate Communications and the Glasgow City Region’s
Communications team.   
In terms of East Airdrie Link Road, a joint communication plan will be developed
with NHS Lanarkshire and North Lanarkshire Council to coordinate communication,
stakeholder engagement and promote the projects as they develop.   
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
A key risk for the City Deal Programme is the current global economic climate and
its short and long term impacts on the delivery of the city deal projects.  This risk is
becoming a live issue for the Programme and will be assessed and recorded within
the City Deal Issues Register. This is not unique to City Deal and the approach to
this risk and issue management will be carried out in conjunction with Finance and
the Glasgow City Region Project Management Office.   
Risk management of North Lanarkshire’s City Deal activity is incorporated within
the council’s City Deal programme risk register which is reviewed by the City Deal
Manager and reported to the council’s City Deal Board.  The City Deal risks are
also integrated in the Planning and Regeneration Service Risk Register.  Each City
Deal sub project has a detail risk register and is managed by the Project Manager. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒
Page 14 of 128

Page 15

If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 15 of 128

Page 16

Page 16 of 128

Page 17

North Lanarkshire Council 
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    PH/CB Date 29/08/25 
North Lanarkshire Town Centre Retail Business Fund 
From  Pamela Humphries, Chief Officer (Place) 
E-mail browncar@northlan.gov.uk Telephone
Caroline Brown,
Enterprise Development
Manager, 07919 483861 
Executive Summary 
The purpose of this report is to outline plans to introduce a pilot grant fund designed to
support businesses located within North Lanarkshire’s town centres. The fund will help
address the issue of vacant town centre space, stimulate business start-up activity and
support business expansion. This will help improve amenity, increase footfall and
contribute to re-shaping and creating vibrant town centre environments in line with the
Council’s Economic Regeneration Delivery Plan (ERDP) 2023-2028. 
Recommendations
It is recommended that the Enterprise and Fair Work Committee: 
(1) Acknowledge the transition of retail in a town centre context and the need for
targeted grant and business support. 
(2) Recognise the potential of the fund to stimulate new business creation, support
existing business growth as well as employment within North Lanarkshire’s town
centres. 
(3) Approve the proposed North Lanarkshire Town Centre Retail Fund to operate as a
pilot programme during the 2025/6 financial year. 
The Plan for North Lanarkshire 
Priority  Improve economic opportunities and outcomes
Ambition statement (5) Grow and improve the sustainability and diversity of North
Lanarkshire's economy
Programme of Work Invest in North Lanarkshire
Programme of Work Transforming Places   
Item 3
Page 17 of 128

Page 18

1. Background 
1.1 In North Lanarkshire the Wholesale, Retail and Repair sector contributes significantly
to the local economy. Scottish Government Businesses in Scotland statistics for 2024
indicate that there are 1,510 businesses operating in the sector, employing 20,450
people and generating £4.839billion in turnover. This accounts for 18% of North
Lanarkshire’s total business numbers, 21% of North Lanarkshire’s total employment
and 28% of the total turnover generated by North Lanarkshire businesses. 
1.2 In a North Lanarkshire town centre context, retail is transitioning.  As with most other
areas in Scotland and the UK, vacancy rates continue to increase as town centres are
impacted by out-of-town retail parks and the continued growth in online shopping. North
Lanarkshire’s town centres have an average vacancy rate of 17.7%, which is
significantly higher than the Scottish average of 12.2%. This vacancy rate is projected
to continue to rise as retail continues to fall. This decline has been further accelerated
by the impact of COVID and the cost-of-living crisis 
1.3 North Lanarkshire Council is committed to re-shaping its towns to ensure they provide
modern and attractive centres that meet the needs of local communities. The Council’s
Economic Regeneration Delivery Plan (ERDP) 2023-28 details commitment, through
the creation of town centre visions and action plans, to address shared commonalities
in the need to:
• Consolidate retail within our town centres, increase residential footfall and
address vacancy through town centre housing development
• Promote local access to our town centres through active travel
• Establish transport hubs connecting up bus and rail networks
• Incorporate proposals for town or community hubs within our town centres and 
• Create new bespoke gateways to our towns. 
1.4 North Lanarkshire has a lower proportion of small enterprises than in Scotland as a
whole. The number of new business starts per 10,000 working age population (2023)
indicates that there were 49 new starts in North Lanarkshire compared to the Scottish
figure of 53. In relation to 3-year business survival rates, over the period 2020- 2023,
the North Lanarkshire rate was 54.6% which was lower than the Scottish rate of 56%.
Statistics and current economic trends indicate need for support interventions that will
help develop North Lanarkshire’s business birth rate and contribute to improving
business survival rates. 
1.5 Existing business grant schemes administered by North Lanarkshire Council Enterprise
team in the current financial year include:
• The Business Start-Up Fund – this offers 100% funded grants of up to £1,000
(home based businesses) and up to £3,000 (businesses that will take on
commercial premises or employ staff or be VAT registered). The fund is
available at pre-start up to 12 months trading stage and can be accessed by a
range of business sectors.
• The Business Growth Fund - this is targeted to identified key sector industries
(excludes retail) and provides 50% grant funding up to £20,000 (Capital
Expenditure and Infrastructure Improvement projects), £5,000 (Skills/Workforce
development) and £4,000 (Exhibitions/Trade Show attendance).  Businesses
must be trading for more than 12 months and have reached VAT threshold to
apply or demonstrate high growth start-up potential. 
Page 18 of 128

Page 19

2. Report 
2.1 It is proposed that the North Lanarkshire Town Centre Retail Fund will operate and be  
delivered within the current 2025/6 financial year with an allocated budget of £250,000.
Eligible town centre areas would include Airdrie, Bellshill, Coatbridge, Cumbernauld,
Kilsyth, Motherwell, Shotts and Wishaw. Consideration will also be given to outlying
retail cluster areas. 
2.2 There will be three routes into the proposed fund to maximise uptake. These include:
a) Owners of vacant properties or their representatives where they have a new tenant
ready for the premises or are actively in the process of finding one. 
b) Start-ups who want to lease an empty retail property to establish a new business
and 
c) Existing business owners seeking to expand into a new location or bigger property. 
2.3 Retail properties must have been vacant for a minimum period of 3 months to qualify  
for grant support. There must be a minimum lease term of 12-months in place for the 
premises at the time of application to the fund. 
2.4  Ineligible businesses include, but are not limited to, large national chains (ie. Tesco,  
Boots, Starbucks), betting shops, sex shops, pawn brokers, tanning salons,  
tobacconists, vape shops and alcohol-only outlets.  Where the leaseholder applying is    
a social enterprise (including charities), the Council would need to be 
satisfied that the new venture is income generating and adds to the amenity of the town
centre locality. 
2.5 Grant awards from the proposed fund will offer up to 50% of project costs for eligible 
physical works and reconfiguration with a maximum award amount of £20,000 per   
premise. Remaining project costs would be met by the applicant and/or private  
investment or sourced from alternative public funds. Only one application per premise  
may be submitted over the duration of the scheme. 
2.6 This fund will support project costs for eligible internal & external works and 
reconfiguration of ground floor vacant units to enable reoccupation, new commercial 
activity and support new employment opportunities.  Funding can be spent on capital 
investment only. Revenue or operating costs are not eligible with the exception of     
directly related architect fee and professional costs. Eligible project costs 
include:
• internal reconfiguration to support new retail, office, work, exhibition space or
similar, including room partitioning
• installation of permanent WC, kitchen facilities, upgrade of heating, lighting,
plumbing, electrics and sales points
• permanent flooring
• installation or upgrade of fixtures including slat walling and shelving or fittings
such as display units or business equipment
• internal improvements as recommended on the building’s Energy Performance
Certificate
• accessibility improvements above and beyond those required to meet legal  
requirements
• external works and improvements (replacement windows and doors,   
signage and frontages, exterior upgrades).
Page 19 of 128

Page 20

2.7 The Fund would be used to complete work that enables the premises to become
functional, rather than to deliver a bespoke fit out. Two valid quotes will be required for
all items of expenditure. Architect fees and professional costs associated with the
capital expenditure may be included (10% of total project costs considered maximum).
Irrecoverable VAT can be included as an eligible cost. 
2.8 The Fund recognises that consents may be required. These could include Planning
Permission, Listed building Consent and Building Warrant Approval. Applicants will
require to obtain any relevant consents and meet any other legislative requirements
prior to commencement of works. This will be a condition of the grant agreement.
Statutory consent fees are eligible for grant funding where they clearly relate to the
project. 
2.9 All new and existing businesses that express interest in the Fund will be directed into
Business Gateway Lanarkshire services to access advice and support linked to the
project, as well as to be able to apply to the North Lanarkshire Town Centre Retail
Fund. This will ensure that grant is awarded as part of a co-ordinated approach,
ensuring a wider package of business support is channelled into the business. This will
help support business viability and safeguard grant investment to ensure projected
economic impacts are realised. 
2.10 Applications to the North Lanarkshire Town Centre Retail Business Fund will be
appraised by Enterprise team officers, using the same process and compliance checks
applied to existing Business Growth and Start Up funds. Decision making on grant
awards will be taken at a monthly panel where Enterprise officers and a team manager
will discuss recommendations and agree application outcomes. Applicant commitment
to Fair Work First employment principles, including payment of the Real Living Wage
when employing staff, will be a key criteria of the fund.  Businesses will be encouraged
to utilise, where possible, local North Lanarkshire trade contractors, helping maximise
grant budget spend and impact in our local economy. 
2.11 In the event of an application to the Town Centre Retail Fund being declined, the
applicant will have the right to appeal the decision and provide additional information
to support their case. This must be submitted in writing within 14 days of the grant
decline notification being received. 
3. Measures of success 
3.1  It is projected that the fund will grant support between 12-20 new and existing town
centre businesses in North Lanarkshire.  Project success will be measured on the basis
of:
• Number of new businesses supported to start
• Number of existing businesses supported to grow 
• Business start-up and growth turnover projected and achieved within 12 months of
grant award 
• Job creation projected and achieved within 12 months of grant award
• Value (£) of grant award spend directed to local North Lanarkshire trade contractor
and supplier businesses
• Ongoing monitoring and reduction of town centre vacancy rates 
Additionally, the following North Lanarkshire health check indicators will also be
considered to measure success: 
Page 20 of 128

Page 21

C16: Growth in Gross Value Added (GVA) 
C17: Gross weekly pay (residents) – full time employees
C18: % of all people economically active in employment (16-64 years)
C19: % of the VAT/PAYE registered business that survive for at least 3 years 
4. Supporting documentation 
4.1       No supporting documentation 
Pamela Humphries
Chief Officer (Place) 
Page 21 of 128

Page 22

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Funding to support the activity will be met from existing budgets (earmarked
reserves). 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 22 of 128

Page 23

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☒ 
If Yes, please provide a brief summary of the impact? 
Support includes grant provision to improve energy efficiency and performance
within retail premises. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Fund will be actively marketed including the development of marketing
materials, online information, social media, case studies, events and engagement
with businesses. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Risk registers are in place for the service. Key risks include:
• Demand for services – past experience, evaluations and continued
engagement with businesses demonstrate ongoing demand for services.
• Loss of skilled staff 
• Availability of funding – this is a pilot and may identify / unlock demand that
there is no guarantee of servicing in future financial year. However this could
also demonstrate need levels to make case for future provision
• Prevention of fraud – robust grant appraisal and monitoring checks are in place. 
Page 23 of 128

Page 24

5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒ 
Page 24 of 128

Page 25

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref   PH/SH  Date 29/08/25 
Environmental Key Fund Update 
From  Pamela Humphries, Chief Officer of Place  
E-mail hodges@northlan.gov.uk Telephone
Stuart Hodge, Senior
Project Manager
07583 091571 
Executive Summary 
The purpose of this report is to provide committee with an update on the delivery of the
Environmental Key Fund (EKF) and Blacklaw Windfarm Community Benefit Funds,
received from Scottish Power Renewables. These funds are provided to the local
communities surrounding the Blacklaw Windfarm such as Shotts and Hartwood. 
North Lanarkshire Council acts as administrator to the fund and supports the EKF Board
which is comprised of representatives from various public and third sector organisations
operating within the area. 
Various projects have, or are soon to benefit from the fund, including Women’s Aid, Paul’s
Parcels, and EU Church Shotts, which is currently under construction. 
The council will continue to work with the EKF Board to promote the fund, and ensure the
fund’s aims and objectives are fit for purpose, ensuring we maximise benefit to the eligible
local communities that these funds are intended to support. 
Recommendations 
It is recommended that Committee: 
(1) Acknowledges the performance report detailing the delivery of the Environmental
Key Fund and the Blacklaw Windfarm Community Benefit Funds. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement
(16) Transform our natural environment to support wellbeing and
inward investment and enhance it for current and future
generations
Programme of Work Transforming Places
Item 4
Page 25 of 128

Page 26

1. Background 
1.1 The Environmental Key Fund (EKF), established in 2004 and re-launched in June 2009,
is an incorporated and enrolled Distributing Environmental Body which is a separate
entity from North Lanarkshire Council (NLC). 
1.2 The Blacklaw Windfarm was constructed in three phases. To offset any adverse
environmental impacts caused by the construction of the windfarm, the EKF was set
up to receive payments from Scottish Power Renewables (UK) Ltd to be distributed to
community-based projects within the agreed eligible grant area. 
1.3 Communities such as Shotts, Hartwood, Allanton and Bonkle are within the eligible
grant application zone. A map illustrating the eligible area is provided within Appendix
1 of this report. 
1.4 Annual payment transfers were agreed at the outset between Scottish Power
Renewables and North Lanarkshire Council as follows: 
• £1,000 per annum, per megawatt generated from Blacklaw Phase 1
• £2,500 per annum, per megawatt generated from Blacklaw Phase 1b
• £5,000 per annum, per megawatt generated from Blacklaw Stage 2 
1.5 The council entered into an agreement with Scottish Power Renewables (UK) Ltd in
2006 to act as EKF administrator. Revised agreements followed during the expansion
of subsequent extension phases to Blacklaw Windfarm. 
1.6 The council’s main administrative roles include overseeing grant applications submitted
via the EKF website and to support community groups who intend to submit grant
applications or to discuss potential future projects.   
1.7 An EKF Board was established to oversee the distribution of the funds generated from
Scottish Power Renewables. As part of the council’s administrative roles, support is
provided to the board. Board membership includes representatives from Voluntary
Action North Lanarkshire (VANL), Green Action Trust (GAT), Getting Better Together
Shotts (GBT) and North Lanarkshire Council. 
1.8 All website elements and board meetings are arranged by the council along with bank 
account financial issues. All grant payments are arranged by the council but are signed
off by at least two board directors for final payment. At present, there are five board 
directors, including 1 elected member. 
1.9 Since 2018, the EKF has awarded grants totalling £1.3M supporting over 30 local
community-based projects throughout the eligible application area. 
1.10 The following projects are examples of community projects that received grant award
funding: 
▪ Shotts Ironworks Bowling Club – this grant award will allow the club established in
1868 to fully replace the clubhouse roof and at the same time install a solar panel
system with battery storage facility to allow the club to drastically reduce their
energy bills. The club was awarded £104,000 from the EKF. 
▪ Shotts Scout Group – the grant awarded allowed the group to install a battery
storage conversion system to their existing solar panel system which will allow the
Page 26 of 128

Page 27

club to save on energy costs. The group received a grant of £4,695 to support this
project. Future projects are planned to add to this project. 
▪ Friends of Hartwood Cemetery – a very proactive group of volunteers requested
grant support for two projects including a composting accessible toilet allowing
visitors and volunteers to use on site facilities due to the cemetery’s remote
location. The group were awarded £11,000 to pay for the supply and install of the
toilet. The second more recent project was for the installation of bee hives within
the cemetery to replace hives that were previously removed. The group were
awarded £4,120 to complete their project. 
▪ Pauls Parcels - is a food poverty prevention charity.   The group were awarded
£100,000 to support families who live with food poverty/insecurity on a day-to-day
basis. By doing this the group help alleviate fuel poverty within the household by
freeing up what little funds the families have. To further assist families, Pauls
Parcels supply 'heat at home meals' which are pre-cooked healthy, homemade
meals, that the family simply have to take home and reheat in the microwave. The
group also provide emergency food parcels to those who may need assistance.
During the winter period they also run a project called ' Meet, heat and eat'. This is
a free homecooked meal, served to everyone who wishes to join them. This part of
the project began in 2022 and ran until April 2023. During this period, 4000 lunches
were served, free of charge to families. 
▪ Bon accord Football Club is a Scottish semi-professional football club established
in the Lanarkshire League in 1950. The club were awarded a main grant application
of £116,752.00 which allowed them to begin upgrading the facilities at Shotts Bon
Accord and offering the use of the grounds to the wider community. Upgrading the
facilities allowed the club to develop as a hub for the community. The grounds will
host social events, community meetings, and celebrations, bringing people together
and fostering a sense of community. Improved facilities can accommodate family-
oriented events such as fun days, fairs, and festivals, appealing to a wide range of
age groups. Access to the upgraded sports facilities will encourage physical activity,
better facilities can support local football leagues and other sports, providing
opportunities for residents to engage in regular physical activity. The club will be
able to work with community partners to deliver fitness classes, walking football
clubs, and other health-related programmes, promoting a healthier lifestyle for the
community. 
▪ EU Church Shotts – the group were awarded a grant of £110,331 to allow them to
create a better, safer access for pedestrians and groups wishing to utilise the
church facilities. Better water management was created in the form of a SUDS
system with additional tree and shrub planting. 
▪ Spotlight Shotts Theatre – a local theatre group were awarded £100,000 to support
the development of the group and support the development of local environmental
shows highlighting the current environmental issues facing the UK.   
2. Report 
2.1 There are three EKF grants available to eligible community organisations: 
• Community Grant – provides support of up to £2,000 per project
• Small Grant Fund – provides support of up to £20,000 per project 
• Blacklaw Windfarm Community Benefit Fund – provides support of up to
£100,000 per project
Page 27 of 128

Page 28

2.2 The EKF recently revisited the three grant funds available and agreed that due to a
general increase in costs in relation to material and construction costs the three funds
should be increased to new figures as outlined above. This increase would also help
support start up projects over more than one year.     
2.3 The EKF Small Grant Fund is designed to deliver projects which either: 
• Helps to develop or improve a public park or other public amenity for leisure or
recreational purposes
• Conserves or improves biodiversity
• Improves or restores a place of worship or listed building or structure
• Improves energy efficiency 
• Reduces fuel poverty 
2.4 Applicants to the Blacklaw Windfarm Community Benefit Fund can apply for up to
£100,000 of ‘capital’ or ‘revenue’ funding for projects which meet one of the following
five objectives: 
• Objective 1 - providing, maintaining or improving a public park or other
community facility (at a single identifiable site) for leisure or recreational
purposes.   
• Objective 2 - protecting or improving the conservation of identified species or
habitats (at a single identifiable site) that are recognised in the UK Biodiversity
Action Plan (UKBAP) or Local Biodiversity Action Plan (LBAP).
• Objective 3 - maintaining, repairing or restoring a place of religious worship or
a building or structure that has architectural or historical significance.
• Objective 4 - encouraging the more efficient use of energy. 
• Objective 5 - reducing fuel poverty 
2.5 The EKF Board also discussed wider issues now facing communities within the
Environmental Key Fund area and agreed that these were becoming more urgent to
tackle and support following the pandemic and cost of living crisis. These growing
issues included tackling social isolation, food poverty and improving outdoor space for
health benefits. These new and developing problems now form part of the EKF’s overall
objectives. The fund is now not only tackling environmental issues where possible but
also groups struggling to regain financial stability following the pandemic. 
EKF Financial Reporting 
2.6 Below is a summary of the funding generated from Blacklaw Windfarm and received
from Scottish Power Renewables: 
Phase 2020 2021 2022 2023 2024 2025
Phase 1 £7,303 £7,410 £8,074 £9,165 £9559 £9704
Phase 1b £62,691 £63,481 £62,434 £77,798 £80,782 £83,355
Phase 2 £100,412 £101,788 £104,379 £124,894 £129,290 £133,172
Total £170,406 £172,679 £174,887 £211,857 £219,631 £226,231
Page 28 of 128

Page 29

2.7 The Environmental Key Fund bank account balance is currently sitting at £729,842.
Based on recent expenditure and funds committed to existing and future projects there
is approximately £400,000 available. 
2.8 Awareness of the potential EKF funds available is raised through the local community
boards where an EKF director is included as a standing item on the agenda to discuss
and promote what the EKF can support locally. Regular meetings are held with the
Community Partnership Team who have a direct link to the local groups within the area. 
2.9 Following the completion of each project where possible a plaque is presented to the
applicants to erect promoting the EKF’s support. 
Project Pipeline 
2.10 The following projects have not yet commenced but have committed EKF funding of
£224,848.60: 
• Shotts Ironworks Bowling Club
• Springhill Recreational open space
• Voices from the Grave, Paupers Cemetery
• Pauls Parcels – Community Garden 
3. Measures of success 
3.1  NLC/EKF annually report to Scottish Power Renewables (Blacklaw Windfarm) the
projects supported throughout the previous financial year by the Environmental Key
Fund confirming funds allocated throughout the areas listed within section 1.3. Final
reports once projects are complete will be generated reviewing overall success.   
4. Supporting documentation 
4.1       Appendix 1 Blacklaw Windfarm Community Benefit Fund – Eligible Grant Area Map 
Pamela Humphries
Chief Officer (Place)
Page 29 of 128

Page 30

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 30 of 128

Page 31

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The EKF is committed to developing projects where organisations can apply for
solar panel and battery storage installations allowing the projects to reduce the use
of fossil fuels and helping achieve NLC’s carbon emission targets. Green space
and biodiversity projects have been and will continue to be supported by the EKF.     
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The EKF is promoted by NLC’s Community Partnership team and at Community
Council meetings. Events are held where local groups are invited to come to
discuss the EKF and what is can support. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 31 of 128

Page 32

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐                        
Page 32 of 128

Page 33

Appendix 1 
Blacklaw Windfarm Community Benefit Fund – Eligible Grant Area Map   
Page 33 of 128

Page 34

Page 34 of 128

Page 35

North Lanarkshire Council
Report
Enterprise & Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    MH/PH Date 29/08/25 
Economic Regeneration Delivery Plan and Performance
Framework – Annual Progress Report 
From  Pamela Humphries, Chief Officer (Place)  
E-mail hyndsm@northlan.gov.uk Telephone Mark Hynds 
07583 023248 
Executive Summary 
The purpose of this report is to update committee on progress made to date towards the
implementation and delivery of North Lanarkshire’s Economic Regeneration Delivery Plan
(ERDP) and associated Action Plan. The Action Plan is updated annually, and this
progress report details activity as at financial year end 2024/25. 
This report also presents the latest ERDP Performance Framework update which is used 
to monitor wider ERDP performance over the short, medium and longer term (through to 
2035). Unlike the ERDP Action Plan, figures within the Performance Framework are 
reported on a cumulative basis to show the progress against the longer-term ambitions of 
the ERDP. 
Recommendations
It is recommended that the Enterprise and Fair Work Committee: 
(1) Acknowledge the content of this report and progress made towards the delivery of the
2024/25 ERDP Action Plan, which was approved by Enterprise & Fair Work
Committee in February 2024. 
(2) Acknowledge the wider progress and performance against the ERDP 2023-2028. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement
(2) Refocus our town centres and communities to be multi-
functional connected places which maximise social, economic,
and environmental opportunities
Programme of Work Transforming Places
Item 5
Page 35 of 128

Page 36

1. Background 
1.1 The Economic Regeneration Delivery Plan (ERDP) aims to help co-ordinate physical
and economic regeneration activity across North Lanarkshire, increase economic
output and help address social and economic inequality. 
1.2  The ERDP was initially approved by the Enterprise and Growth Committee in August
2019, covering the period 2019-2023. A light-touch refreshed ERDP, covering the
period 2023-2028, was then approved by Enterprise and Fair Work Committee in
February 2023. 
1.3  Since 2019, an Action Plan to support the delivery of the ERDP through a range of key
measures and investment programmes has also been produced and approved each
year by committee. The Action Plan sets the priorities for the financial year ahead,
reflecting progress made to date and the evolving priorities of the council. 
1.4  The 2024/25 Action Plan was approved by Enterprise and Fair Work Committee in
February 2024 and the current 2025/26 ERDP Action Plan was approved in February
2025. 
1.5  An accompanying ERDP Performance Framework was approved by Enterprise and
Growth Committee in February 2021. This comprises of a group of performance
indicators at three levels. These indicators aim to collectively provide an overview of
how the North Lanarkshire economy is performing as well as helping us to understand
the impact that the delivery of the ERDP is having on improving economic opportunities
and outcomes for all. 
2. Report 
Economic Regeneration Delivery Plan 2023-2028 
2.1 The refreshed ERDP continues to focus on the same four key inter-related themes as
the 2019-23 plan:
• Developing housing that promotes improved quality of life and creates a better
place to live;
• Reshaping our town centres to ensure that these provide modern and attractive
centres that meet the needs of our communities;
• Improving our business and industrial infrastructure, creating opportunities for
investment and for companies to start-up or relocate here; and
• Continuing to improve our connectivity and develop new opportunities by
transforming our road, rail and digital infrastructure. 
2.2 To support the delivery of these objectives, annual ERDP Action Plans have been
developed each financial year since 2019/20. 
2024/25 Action Plan – Performance Review 
2.3 Appendix 1 provides an update on the ERDP Action Plan objectives and targets
achieved during 2024/25. 
2.4 Significant progress continues to be made against the ERDP’s key objectives with
highlights during 2024/25 including: 
Page 36 of 128

Page 37

• The delivery of an additional 278 new build homes via the New Supply Programme,
as well as a further 92 Open Market/Empty Homes Purchase Scheme (OMPS)
completions, taking total completions to 2,474 by 31 March 2025 (including OMPS).
• Committee approval of Town Action Plans (TAPs) for Bellshill, Kilsyth and Shotts.
• The formation of a Coatbridge Neighbourhood Board to deliver the UK
Government’s £19.5m Plan for Neighbourhoods funding as well as a series of
public engagement across Summer 2024 to kickstart the development of the
decade long Regeneration Plan for the town.
• A six-week public consultation held at Cumbernauld Library, showcasing initial
timescales and early exemplar images of the reimagined Cumbernauld town
centre, attracting more than 440 in person engagements and 1,600 website views
during the consultation period. 
• 105 new affordable homes delivered across North Lanarkshire’s town centres,
including edge of town sites. This includes NLC developments as well as
Registered Social Landlords (RSLs).
• Construction of Building 3 at Link Park, Newhouse began in February 2025. This
project is scheduled to complete in December 2025 and will deliver 19,375 sq.ft of
new industrial workspace.
• A new Invest NL team and formal multi-disciplinary pre-application service was
established
• As part of the Ravenscraig Access Infrastructure project, demolition works were
completed to properties at Manse Road (former Cook & Indis and Yesss Electrical)
and the former Evans Halshaw dealership and the adjacent vacant commercial unit
at Windmillhill Street.
• Outline Business Case (OBC) approval was secured for the East Airdrie Link Road
(EALR) project from Glasgow City Region City Deal Cabinet in August 2024. 
ERDP Performance Framework 
2.5 The ERDP Performance Framework also highlights significant progress in improving
economic opportunities and outcomes for North Lanarkshire’s residents and
businesses. Highlights achieved as of 31 March 2025 include: 
• 1,629 new build council homes complete
• 845 homes brought into council ownership via the Open Market Purchase Scheme,
including some homes previously sold under the Right to Buy.
• £119.7 million invested in town centre (including edge of town) developments, of
which more than £56 million was secured via external funding sources.
• Town Action Plans (TAPs) approved for Airdrie, Bellshill, Kilsyth, Motherwell, Shotts
and Wishaw
• 1,797 new affordable town centre homes completed (including edge of town sites) 
by the council and housing associations. This includes developments across most 
of our towns with completed sites including the former Orrs building, South Bridge
Street (Airdrie), Brandon Street (Motherwell), the former Kingfisher Building,
Dowanfield Road (Motherwell), Caledonian Avenue (Bellshill), 95 Main Street
(Kilsyth) and Roberts Street (Wishaw) amongst others.
• 169,733 sq.ft of business and industrial workspace created or refurbished as a 
result of investment by NLC, Fusion Assets and North Lanarkshire Properties
(NLP).
• £62.3m invested in key road infrastructure projects funded via NLC and the
Glasgow City Region City Deal. 
Page 37 of 128

Page 38

3. Measures of success 
3.1  The purpose of this report is to highlight the key actions, targets and indicators that are 
used to measure and monitor the delivery of the ERDP through the ERDP Action Plan 
and Performance Framework   
4. Supporting documentation 
4.1 Appendix 1   Economic Regeneration Delivery Plan (ERDP) Action Plan 2024/25 –
End-Year Performance report 
4.2 Appendix 2    ERDP Performance Framework (June 2025) 
Pamela Humphries
Chief Officer (Place) 
Page 38 of 128

Page 39

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 39 of 128

Page 40

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Risks are recorded and managed within Corporate Risk Register.
Key risk is failure to deliver on the ERDP and its objectives of helping co-ordinate 
physical and economic regeneration activity across North Lanarkshire, failing to
increase economic output or address social and economic inequality. 
This would result in the loss of additional economic and social benefits to residents
and businesses across North Lanarkshire and significant reputational damage to
the Council given the widespread public nature of the programme 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 40 of 128

Page 41

Appendix 1 
ERDP Action Plan 2024/25
End-Year Performance Report 
Page 41 of 128

Page 42

Theme: Live
ERDP Priority 1: Developing housing that promotes improved quality of life and creates a better place to live
Ref ERDP Action 2024-25 Target What we achieved (2024-25) RAG
1.1 Continue to focus
investment towards the
council’s affordable
housing stock to make
sure that the target of
6,000 new council
homes for North
Lanarkshire is reached
by 2035
Complete 268 new build council homes during
2024/25
278 new council homes completed during
2024/25. 
As at end of 2024/25, 2,474 new council
homes are complete (including Open
Market Purchase Scheme). A further 176
homes are currently under construction. 
Green
1.2 100 Open Market/Empty Homes Purchase
Scheme completions during 2024/25
92 Open Market/Empty Homes Purchase
Scheme completions during 2024/25.
Amber 
1.3 Complete the acquisition of 82 new build off
the shelf units during 2024/25
A total of 96 affordable homes delivered off
the shelf via private developers in 2024/25. 
A further 3 projects, with a total of 137
homes are due to be delivered via off the
shelf purchases by 2028.
Green
1.4
Continue to support the
delivery of the affordable
housing programme,
including intermediate
tenures such as mid-
market rent
Prepare the 2025/26 SHIP which will identify
sites to meet Local Housing Strategy priorities
and maximises the use of available Scottish
Government grant funding. Support the
delivery of sites within the current 2024/25
SHIP
SHIP (2025/26 – 2029/30) formally
approved and published on NLC website.
SHIP (2026/27) currently being developed
and due for submission by 31 October
2025.
Green
1.5
Enable private sector
housing development to
support the local
economy and the
regeneration of strategic
sites such as
Ravenscraig
943 private tenure units estimated to be
completed during 2024/25
1,022 housing units were delivered during
2024/25 across North Lanarkshire.
This includes 675 private tenure homes and
347 affordable tenure homes. 
Red 
Page 42 of 128

Page 43

Theme: Invest
ERDP Priority 2: Reshaping our town centres to ensure they provide modern and attractive centres that meet the needs of our
communities
Ref ERDP Action 2024-25 Target What we achieved (2024-25) RAG
2.1
Establish and commence
delivery of Town Action
Plans for all eight town
centres (aligned with our
approved Town Vision),
agreeing short, medium
and long-term
investment plans for
each.
Finalise Town Action Plans for Bellshill,
Kilsyth and Shotts
Town Action Plans were developed and
approved by Enterprise & Fair Work
Committee in May 2024.
Green
2.2
Production and submission of a Town Action
Plan for Coatbridge by August 2024, aligned
to the UK Government’s requirements for the
Long-Term Plan for Towns funding to secure
and draw down the first tranche of the
£20million allocated to Coatbridge over the
next 10 years
Due to the UK General Election in July
2024 and the subsequent formation of a
new Labour UK Government, The Long-
Term Plan for Towns fund was paused and
ultimately repackaged as the Plan for
Neighbourhoods. 
Significant consultation and engagement
work has already been conducted, and the
Coatbridge Neighbourhood Board has been
formed. A Regeneration Plan and
associated Investment Plan, covering the
first 4-years of delivery, are now being
finalised and will be submitted by the
deadline of November 2025 at the latest.
Green
2.3
Continue with The Centre Cumbernauld
project, including business and stakeholder
engagement.
The regeneration of Cumbernauld town
centre continued to make significant
progress during 2024/25. The demolition of
Fleming House commenced in December
2024, marking the first steps to regenerate
the town. 
Significant engagement activity also took
place with businesses and third sector
organisations based within the NLC owned
The Centre Cumbernauld over Summer
2024 to communicate high-level plans and
timescales for redevelopment. 
Green
Page 43 of 128

Page 44

A 6-week public consultation also took
place during late August – early October
2024. This included an exhibition space
within Cumbernauld Library. Officers
engaged with over 400 visitors during this
time. Further consultation will be
undertaken during the master-planning
process with all stakeholders.
2.4
NLC and RSLs to deliver 105 new affordable
homes within our town centres (including
edge of town) during 2024/25
105 units delivered during 2024/25 at town
centre/edge of town developments
including the former Orrs building at South
Bridge Street (Airdrie), Brandon Street
(Motherwell), Downfield Road
(Cumbernauld) and Leslie Street
(Motherwell).
Green
2.5
Continue to prioritise
funding and secure
external investment for
the regeneration of our
town centres
Deliver the Scottish Government’s Place
Based Investment Programme (PBIP)
anticipated allocation of £1.698 million for
2024/25
NLC was allocated £830k via the Scottish
Government’s Place Based Investment
Programme for 2024/25. This was fully 
contractually committed. 
This funding was allocated towards the
£12m Strathclyde Watersports Centre
redevelopment project which will see the
centre redeveloped into a low-carbon hub. 
Green
2.6
Submit a final stage funding application for
approximately £2.5 million to HES and NLHF
to support the Rediscovering Airdrie project. 
It is proposed that this project will include the
redevelopment of Airdrie Library, the
repurposing of Airdrie Town House, and
shopfront improvements through grants to
property owners.
Development works continued on the
Rediscovering Airdrie project during
2024/25, including the necessary Skills and
Materials Audits required by Historic
Environment Scotland and the National
Lottery Heritage Fund. Engagement has
also taken place with local shop owners
and local community groups to develop an
Area Action Plan and Activity Plan, which
are also required for submission as part of
funding guidelines. 
Amber
Page 44 of 128

Page 45

The development phase was part funded
via a £100k contribution from the National
Lottery Heritage Fund and an additional
£50k from Historic Environment Scotland,
as well a contribution from North
Lanarkshire Council. 
The conclusion of the development phase
was extended throughout 2024/25 due to
the attempted sale of a private property
originally within scope for this project, which
led to the project refocusing on Airdrie
Public Library as the core redevelopment
offering. 
A delivery phase application is now being
developed which will be submitted during
August 2025 and a funding decision is
expected by December 2025.
2.7
Continue to promote and engage with local
community organisations to enable external
funding applications to third party
regeneration funds, where appropriate (e.g.
Scottish Government’s Regeneration Capital
Grant Fund)
During 2024/25, the City Deal &
Regeneration team engaged with local
community groups to develop bids towards
the Scottish Government’s Regeneration
Capital Grant Fund (RCGF) and Vacant
and Derelict Land Improvement Programme
(VDLIP). However, due to budgetary
constraints, these funds were temporarily
paused during 2024/25 and no new awards
were granted. 
These funds have since restarted and North
Lanarkshire has received a conditional
award of grant of £735k towards the
community led Cumbernauld Village Blue-
Green Space project.   
Green
Page 45 of 128

Page 46

2.8
Support community led projects, successfully
funded under Scottish Government
regeneration funds, include the Regeneration
Capital Grant Fund (RCGF) and Vacant and
Derelict Land Investment Programme (VDLIP)
During 2024/25, officers supported
Motherwell Football Club Community Trust
to deliver The Well Hub project which was
awarded £215k from the Scottish
Government’s Regeneration Capital Grant
Fund (RCGF) 2023/24 application round.
The Well Hub officially opened in October
2024 and provides a community-based
response to the challenges of poor mental
health and wellbeing - using football to
engage with hard-to-reach groups that are
at a higher risk of suicide.
Green
2.9
Review how NLC can be
more effective in
addressing failing
buildings in our town
centres
Continue to engage with local property/land
owners with a view to acquiring key town
centre properties / sites earmarked for
conversion / redevelopment. 
Where necessary, commence CPO
processes, as a last resort, if failure to
purchase a site would be detrimental to town
centre regeneration plans.
Officers continued to engage with various
property/landowners during 2024/25, to
enable key town centre projects to
progress. 
In February 2025, Finance & Resources
Committee approved the purchase of a
private property within Cumbernauld town
centre and legal agreements are currently
being finalised before North Lanarkshire
Council takes possession. 
CPO being considered at Main St,
Coatbridge if last remaining ownership
interest cannot be acquired by voluntary
means. 
Green 
Page 46 of 128

Page 47

PlannedTheme: Work
ERDP Priority 3: Improve our business and industrial infrastructure, creating opportunity for investment and for companies to
start-up or relocate here
Ref ERDP Action 2024-25 Target What we achieved (2024-25) RAG
3.1
Promoting a mix of
development across our
motorway corridors and
accessible business
locations to support the
development of our
foundational economy
as well as high-end
growth
NLC and Fusion Assets to invest a
minimum of £3m in key business and
industrial projects (e.g. Condor Park and
Braidhurst Industrial Estate)
In 2024/25 Fusion Assets invested £350k
of its own capital. This was committed to
the construction of Building 3 at Link
Park, Newhouse. In addition, NLC
provided a capital contribution of
£1.125m towards this project during
2024/25. 
Planned investment of £2.2m in 2024/25
by Fusion Assets   in Condor Park and
Gartcosh Phase 2 was delayed pending
outcome of the ALEO review.  This
investment will now take place in
2025/26. 
A further £3.2m was invested by the
council in upgrading Braidhurst Industrial
Estate during 2024/25. 
Green
3.2
£5 million external funding (including
private sector funding) to be secured by
NLC / Fusion Assets for business and
industrial infrastructure in 2024/25
Fusion Assets secured £1.231m in VDLF
funding for 2024/25 for additional phases
of enabling works at Gartcosh and Link
Park, Newhouse. 
Private sector investment in Gartcosh
and Condor park was put on hold
pending conclusion and outcome of the
ALEO review. Fusion Assets is actively
working to secure this investment.   
Amber
Page 47 of 128

Page 48

Additionally, £1.9m was also invested at
Braidhurst Industrial Estate during
2024/25, via a mixture of Scottish
Government’s Regeneration Capital
Grant Funding (RCGF) and Place Based
Investment Programme (PBIP) funding. 
3.3
27,300 sq.ft of business and industrial
workspace to be created or refurbished by
NLC, Fusion Assets and North
Lanarkshire Properties in 2024/25
Construction of Building 3 at Link Park ,
Newhouse began in February 2025. This
project is scheduled to complete in
December 2025 and will deliver 19,375
sq.ft of new industrial workspace. 
Six NLP owned light-industrial units were
also refurbished during 2024/25 at
Braidhurst Industrial Estate, modernising
17,000 sq.ft of business workspace. NLP
are currently in the process of re-letting
these units to businesses. 
Works to create an additional 10,330 sq.ft
of new workspace at Braidhurst Industrial
Estate also progressed during 2024/25
and will be completed during 2025/26. 
Green
3.4
Complete delivery of the Braidhurst
Industrial Estate project. 
This project will deliver 10 new build
business start-up units and the
refurbishment of 6 existing NLP owned
units as well as environmental and
infrastructure improvements throughout
the estate.
Significant progress was made with the
Braidhurst Industrial Estate upgrade
project during 2024/25. 
The 10 new build units are currently
awaiting the completion of utility
connections before being handed over to
North Lanarkshire Properties. Handover
is expected during 2025/26. 
Amber
Page 48 of 128

Page 49

3.5
Develop a Business and Industry strategy
and related Action Plan which will form
part of evidence base for next Local
Development Plan.
Work to develop the Business and
Industry strategy is underway. The
strategy will be presented to the
Enterprise & Fair Work Committee
November 2025.
Amber
3.6
Continuing to support
enabling investment
which brings our vacant
and derelict land and
brownfield sites into
commercial use
4.5ha of land to be remediated or
improved (by NLC or Fusion Assets) for
business and industry use in 2024/25.
Fusion Assets let contracts for enabling
works covering 4.4ha (at Ravenscraig
Phase 2, Gartcosh Phase 2 and Plot 3 at
Newhouse) during 2024/25.
Green
3.7
Improving how we
record and respond to
enquiries from
businesses to provide a
coordinated approach
across relevant council
services to help attract,
retain and expand
business and
employment
opportunities
Progress delivery of the Invest in NL
Programme of Work.
Invest NL team and formal multi-
disciplinary pre-application service
established during 2024/25. A number of
cases are now progressing through the
system, both New Supply and external
business. Committee approval for fee
structure and process will be reviewed
January 2026.
Green
3.8
Deploy and promote the Case
Management System to North Lanarkshire
based businesses.
Case management system is now
complete. Further work is being
undertaken to develop the system to
accept grant applications online. There
will be linked campaign when the grants
go live to encourage businesses to
register.
Amber
3.9
Building upon work
which supports
innovation and skill
development through
the
development of sectoral
learning academies
Deliver NL Academies projects which are
funded via UK Shared Prosperity Fund
(UKSPF). 
The Built Environment Academy and
supporting Sector Board will implement,
prioritise, and progress its plan of work
and aim to implement a sustainable
2024/25 UKSPF projects were delivered
successfully and within budget across the
Built Environment and Digital Sectors.   
The Built Environment Sector Skills
Board has prioritised and is progressing 2
workstreams and a supporting research
project to help tackle the industry's skills
and workforce challenges.  
Green
Page 49 of 128

Page 50

funding model for skills development
within the industry. 
Within Care, a focus on collaborative
apprenticeships is planned, along with
ensuring pathways for people to work in
the care sector are developed. 
Within the Digital Academy, work will be
progressed to develop an approach to
addressing the digital skills gaps within
North Lanarkshire.
The research project looks to gain a
better understanding of the future
demand and supply of built environment
skills in the local area to create an
evidence base to support the Boards
workstreams / activity.  The 2
workstreams linked to this project are the
creation and implementation of the North
Lanarkshire Built Environment Academy
and the introduction of a Youth
Engagement Strategy. 
Within Care, the first collaborative
apprenticeship in conjunction with NHS
Lanarkshire is underway.  The Care
Academy Steering Group is progressing
5 workstreams:
• Attraction, recruitment, retention and
wellbeing 
• Young Peoples Pathways to Care
• Adult Pathways to Care
• Funding and Procurement
• Communications 
Within the Digital sector, Digital
Bootcamps were delivered to young
people aged 16-24 years old to gain
business-related and technology-related
skills with support towards apprenticeship
opportunities also provided.   Employer
engagement around digital skills in Care
and the Built Environment also begun.  
Page 50 of 128

Page 51

3.10
Supporting investment,
via our Arms-Length
External Organisations,
that will continue to
improve, modernise and
expand commercial
stock availability across
North Lanarkshire
Conclude sale of Phase 1 and progress
the second phase of development at
Gartcosh Industrial Park which consists of
a further 3 units totalling 69,000 sq.ft.
Successful investment sale of Phase 1 at
Gartcosh Industrial Park completed in
April 2024. The second phase of
development was put on hold pending
outcome of ALEO Review but is now
being progressed with joint venture
partner.
Amber
3.11
Progress delivery of Condor Park,
Eurocentral through securing loan finance,
tendering the construction contract and
beginning construction of a speculative
industrial scheme to provide an additional
41,000 sq.ft of industrial space. 
Project was put on hold pending outcome
of the Council ALEO Review - now being
picked up and progressed with potential
Joint Venture partner and funders. Works
are anticipated to begin during 2025/26.
Amber
3.12
Following the successful letting of Building
2, explore funding opportunities to
complete the development at Link Park,
Newhouse by constructing a 20,000 sq.ft
industrial unit on the remaining vacant
plot. This is subject to a successful NLC
capital funding bid and will also include
contributions from the Scottish
Government’s Vacant and Derelict Land
Fund (VDLF) as well as Fusion
Assets funding.
During 2024/25 Fusion Assets
assembled a funding package for the
19,375 sq.ft Building 3 at Link Park,
Newhouse which consisted of a £896k
VDLF award, alongside £1.125m from
NLC's Capital Programme and £350k
from Fusion Assets own capital
resources. 
The building contract was tendered and
let in February 2025 and works are
scheduled to be complete by December
2025. 
Green  
Page 51 of 128

Page 52

Theme: Invest
ERDP Priority 4: Continuing to improve our connectivity and develop new opportunities by transforming our road, rail and digital
infrastructure
Ref ERDP Action 2024-25 Target What we achieved (2024-25) RAG
4.1a
Continue to deliver the
City Deal Infrastructure
Programme
Ravenscraig Access Infrastructure 
Continue to progress the delivery of
Ravenscraig Access Infrastructure project
to support the redevelopment and connect
the M74 and M8 as part of the Pan
Lanarkshire Transport Corridor. 
Commence demolition works to former
business sites at Airbles Road and
Windmillhill Street. 
Demolition works were completed during
2024/25 to properties at Manse Road
(former Cook & Indis and Yesss
Electrical) and the former Evans Halshaw
dealership and the adjacent vacant
commercial unit at Windmillhill Street.
Green
4.1b Procure and award contract for advance
ground works.
Value engineering consultancy
commission awarded which will inform
the scope of enabling works and advance
ground works packages. 
Amber
4.1.c Procure and award contract for the dual
carriageway construction works
A Value Engineering Review was
awarded to ensure the design and layout
of the Motherwell to Ravenscraig road
link remains fit for purpose. The review
provides an opportunity to examine the
design and construction methods to
manage costs and where possible, create
efficiencies in the delivery phase to
minimise disruption and impact to road
users. A tender package for the
construction of the dual carriageway will
be prepared during 2025/26. 
Amber
Page 52 of 128

Page 53

4.1d
Develop detailed designs for upgrading
the A723 from New Craig junction at
Ravenscraig to the M8 at Holytown. 
Design work is completed and detailed
design package output
delivered. The Project has been deferred
and is not scheduled to proceed within
the current City Deal programme 
Green
4.2a
East Airdrie Link Road 
Continue to progress delivery of the East
Airdrie Link Road (EALR). Progress
Design Manual for Roads and Bridges
(DMRB) Stage 3 consultancy services
contract. Confirm alignment and
commence design. Commence
Environmental Impact Assessment.
The appointed consultant team for the
EALR project are progressing through
DMRB Stage 3 (preliminary design and
planning) with progress against the
agreed programme maintained. Work
commenced on the Environmental Impact
Assessment.
Green
4.2b
Secure Outline Business Case (OBC)
approval from the Glasgow City Region
City Deal Cabinet
Outline Business Case (OBC) was
approved by Glasgow City Region City
Deal Cabinet in August 2024.  Green
4.3a
Orchard Farm Roundabout 
Progress delivery of the Orchard Farm
roundabout to support the development of
key business and industrial sites on the
A8/M8 corridor.
The Orchard Farm Roundabout project
will be procured and delivered by the
private sector Mossend International Rail
Freight Park (MIRP) partnership. City
Deal funding will provide a contribution
towards provision of a four-arm
roundabout on the A8 at Orchard Farm.
Progress with delivery stalled due to
construction cost pressures and a
corresponding need for the development
partnership to undertake a value
engineering review and develop an
associated revised design solution for the
roundabout junction. 
Amber
Page 53 of 128

Page 54

This has resulted in a proposal which is
more cost and time efficient to deliver
and meets the in-principle approval of
Transport Scotland but requires
acquisition of areas of land to the north of
the A8 from another commercial party.
Positive progress was made by the
private sector partnership in relation to
acquisition negotiations on land required
for construction of the revised roundabout
layout, however terms have not yet been
finalised.
4.3b
Secure Full Business Case (FBC)
approval for the Orchard Farm
Roundabout from the Glasgow City
Region City Deal Cabinet. 
It is now proposed to submit the Full
Business Case (FBC) in August 2026 to
reflect the MIRP Partnership's revised
procurement and delivery programme. 
4.4a
Eurocentral Strategic Active Travel 
Progress delivery of the Eurocentral
Strategic Active Travel project. 
Appoint consultants to develop detailed
designs for Phase 1 (Holytown to
Eurocentral and Holytown to Newhouse)
and Phase 2 (Whifflet Corridor). 
Consultants have been appointed to
prepare detailed designs and prepare
tender documentation for Phases 1 and 2
of the project. The commission is
progressing well. Additional traffic survey,
topographical survey and design review
requirements have been identified which
will impact on programme for completion.
Green
4.4b Commence procurement for construction
works
It is now proposed to commence
procurement for Phase 1 and 2
construction works in early 2026.
Amber
4.4c
Appoint consultants to carry out an options
appraisal, select preferred option and
prepare concept designs for Phase 3
(Bellshill to Mossend).
Consultants have been appointed to
undertake options appraisal and develop
concept design for Phase 3. The
commission is progressing well.
Green
Page 54 of 128

Page 55

4.5
Invest in the delivery of
the council’s Active
Travel Strategy to
ensure a comprehensive
connection of active
travel routes to key
places across North
Lanarkshire
Continue to develop the Active Travel
Strategic Network Routes (SNRs), to
ensure a portfolio of construction ready
projects can then be progressed in line
with external funding resources. 
Detailed designs for the 2 highest priority
active travel Strategic Network Routes
(SNRs) will be progressed during 2024/25.
These are:
• SNR7 (Uddingston to Caldercruix via
Coatbridge and Airdrie utilising both
NCN75 and A89 route operations)
• SNR9 (Airbles Road to South
Lanarkshire at Strathclyde Country Park
and to Bothwell) 
The detailed design for both SNR 7 and
SNR 9 has been completed. Funding is
currently being pursued for the
Coatbridge to Airdrie section of SNR 7.
Subject to successful funding, this
segment is scheduled for delivery in the
2025/26 financial year (1.4km). 
Further stakeholder engagement and
consultation are required for SNR 9, this
is planned for the 2025/26 financial year. 
In addition, detailed design work has
been undertaken for active travel routes
linked to the community hubs and City
Deal projects. 
There have also been other sections of
the active travel network constructed,
including: 
• Glasgow Road (SNR 3)
• Carnbroe (LNR 315)
• Carlisle Road/Craigneuk Park
(supports SNR 7 and SNR 3)
• Motherwell Station Active Travel
Routes (SNR 3) 
Green  
Page 55 of 128

Page 56

4.6 
Continue to progress delivery of the
Motherwell Station Active Travel Links
project. Complete detailed design for
Phase 2 of the project (Bellshill Road)
Detailed design of the Bellshill Road
phase of the project was not able to
progress during 2024/25 financial year
due to a lack of external funding. A bid
has been submitted to Transport
Scotland for design funding for 2025/26
financial year to take forward this work. A
decision is expected in August 2025. 
Red
4.7
Ensure that inclusive
economic growth
remains at the heart of
opportunity to support
affordable and
accessible transport
systems (via the Local
Transport Strategy)
Develop North Lanarkshire’s Local
Transport Strategy, which will be the
mechanism for delivering on this ERDP
recommendation.
The Local Transport Strategy (LTS) has
undergone the first stage of engagement
and consultation. This ran from
November 2024 - February 2025 and
involved:
• Internal and External Workshops
(including NLC Officers, Elected
Members, Key Stakeholders,
Community Boards/Councils)
• Community drop-in events
• A public survey (which received more
than 1,000 responses) 
This engagement allowed all transport
constraints, challenges, and opportunities
to be identified to help shape the new
LTS with relevant key issues. 
Furthermore, while the consultation
process was running, a variety of
baseline data was being collected and
analysed. 
Green
Page 56 of 128

Page 57

Baseline data has been collected and
analysed alongside the consultation data
and a vision statement, objectives and
indicators for the new LTS have been
developed. 
It is anticipated that the LTS will be
finalised during 2025/26.
4.8
Support the delivery of
Electric Vehicle (EV)
charging infrastructure
and other green
transport solutions
across North
Lanarkshire
Develop and implement a Glasgow City
Region approach to appoint a provider to
increase, manage and maintain public EV
infrastructure.
During 2024/25, Jacobs was appointed to
undertake contract development. 
A Prior Information Notice (PIN) was also
issued and an initial site selection review
was completed.
Green
4.9
Work with the council’s
digital partner to install
and invest in
infrastructure that helps
create one of the best
and most affordable/
accessible digital
provisions in the UK.
Completion of the councils Wide Area
Network (WAN), integrating all Corporate
and Education sites. 
Progress next phase of call off contracts
covering public Wi-Fi and CCTV services. 
NLC and Commsworld Ltd will continue to
maximise added value via the Framework
Agreement for the provision of digital
connectivity services and associated call-
off contracts, ensuring the delivery of
Community Benefits and additional value
throughout 2024/25. 
The additional value will focus on
increasing full fibre coverage, take-up of
services and vouchers, choice &
innovation and future proofing.
Fibre Infrastructure has now been
completed across all
Corporate/Education sites. 
The final phase of the Public Wi-Fi roll
out across the NLC estate is currently
ongoing. There are currently 29 live sites
with a further 14 sites expected to be live
by end August. 
Works have continued to progress with
smart park technology deployed via an
Intelligent Lighting System within
Palacerigg and Strathclyde country parks
is now live.
Green 
Page 57 of 128

Page 58

Appendix 2 
Economic Regeneration Delivery Plan (ERDP)
Performance Framework 
June 2025 
Page 58 of 128

Page 59

Introduction 
Improving economic regeneration plays a significant part in our shared ambition to make North Lanarkshire the place to live, learn, work, invest
and visit. 
The Economic Regeneration Delivery Plan (ERDP) sets out how we will improve economic opportunities and outcomes for everyone in North 
Lanarkshire. This includes delivering new homes, reshaping town centres, attracting investment and jobs. Our investments will benefit everyone
who lives, learns, invests and visits within North Lanarkshire. 
An ERDP Action Plan is updated annually and focuses on our key objectives and day‐to‐day activities in delivering the longer‐term vision set
out within the ERDP and The Plan for North Lanarkshire. 
The ERDP Performance Framework comprises a set of performance indicators at three levels. These indicators aim to collectively provide an 
overview of performance that helps us to understand the impact of our work on improving economic opportunities and outcomes for all. 
Given the shared ambition set out within The Plan for North Lanarkshire, the ERDP Performance Framework is closely aligned to the corporate 
Strategic Performance Framework. 
This framework aims to produce evidence that allows for day‐to‐day activities, and progress made towards improving economic opportunities
and outcomes for all to be regularly monitored, reported, assessed, and scrutinised. 
It will also enable performance issues against the ERDP’s key priorities to be identified and addressed, mitigating the risk of delivery failure. 
The ERDP Performance Framework will be kept under review to ensure arrangements remain effective and aligned to future versions of the
ERDP and The Plan for North Lanarkshire. 
ERDP Performance Framework 
The three levels of performance indicators form an interrelated set, with operational measures supporting improvements to services and
outcomes for North Lanarkshire’s residents and businesses in the short, medium, and long‐term. The three levels are summarised below: 
Level 1: The North Lanarkshire Economic Context 
A suite of ‘state of the nation’ health check indicators which collectively provide the North Lanarkshire economic context. 
These indicators are often at a macro level and out with the sole control of the Council. As such, these indicators do not have targets set
against them, instead they set out the intended direction of travel. This approach is consistent with The Plan for North Lanarkshire Strategic
Page 59 of 128

Page 60

Performance Framework. The ERDP framework uses 5 of the 28 indicators set out in the Strategic Performance Framework to assess the
performance of the North Lanarkshire economy. 
Data comes from national sources such as the Office for National Statistics (ONS) or Scottish Local Authority Economic Development (SLAED) 
Performance Reports. As data is reported in a consistent manner nationally, North Lanarkshire can be benchmarked against Scotland and 
comparator authorities across the Glasgow City Region. 
Level 2: Improving economic opportunities and outcomes for all 
A suite of indicators and information to enable an assessment of progress towards our long‐term vision of improving economic opportunities and 
outcomes for all. 
When measuring outcomes there is often a delay in being able to demonstrate that outcomes have been achieved, or it may not be clear how
much of a change in an outcome can be attributed to NLC’s actions alone, or if external factors have influenced the outcome. Therefore, some
of these indicators do not have targets set against them but will instead be used for benchmarking purposes. 
The group of performance indicators at all three levels in the ERDP Performance Framework therefore aims to collectively demonstrate 
improvements to outcomes in the long‐term, while demonstrating effective use of resources in the short term (the latter through monitoring and 
measuring day to day operations). 
Level 3: Day to day operations 
These performance indicators allow the quality, efficiency, and effectiveness of day‐to‐day operations to be assessed. They include targets in
the short‐term (current financial year), medium‐term, by the end of the current ERDP cycle (2027/28) and longer‐term (2035). 
Targets are cumulative from the baseline onwards (not additional to previous target). For example, the 1,845 Open Market Purchase Scheme 
completions by 2035 includes the 845 completions which have already been achieved by March 2025. 
Relevant teams across Place are identified against each indicator to ensure accountability. The inclusion of input and output measures, and
understanding how these lead to improved outcomes, will be an important factor in determining the success of the Framework and Economic
Regeneration Delivery Plan. 
Page 60 of 128

Page 61

ERDP Performance Framework: Level 1 
The North Lanarkshire Economic Context 
Indicator Baseline Latest
available
update
Measuring this
will tell us if we
have…
What
success
looks like
Intended
direction
of travel
Latest
direction
of travel
North Lanarkshire commentary
Growth in
Gross
Value Added
(GVA) (income
approach) - %
change from
year to year
2015 –
2016 
NL
2.6% 
Scotland
1.1%
2021 –
2022 
NL
8.9% 
Scotland
10.0%
Increased 
North 
Lanarkshire’s 
economic 
output
Continued 
economic 
growth in 
North
Lanarkshire  
The latest data published shows
that GVA growth remains positive
suggesting NLs economy
continues to grow, this follows a
dip in 2020 which mirrored the
national position. 
The latest data shows an 8.9%
increase in GVA per head in NL
from 2021 to 2022 which is an
improvement from 6.1% in the
previous year’s figures and higher
than the position just before the
pandemic of 4.4% (2019)
Gross weekly
pay (residents)
– full time
employees
2018 
NL
£545.70 
Scotland
£562.70
2024 
NL
£740.40 
Scotland
£740.00
Increased 
the earnings 
of people 
who live in 
North
Lanarkshire
Earnings for 
people who 
live in North 
Lanarkshire 
continue to 
grow on a
par with
national
levels 
Gross weekly pay for NLs
residents became higher than the
average earnings for Scotland for
the first time ever in 2022; latest
results shows this positive position
remained into 2023 and 2024.
Page 61 of 128

Page 62

Indicator Baseline Latest
available
update
Measuring this
will tell us if we
have…
What
success
looks like
Intended
direction
of travel
Latest
direction
of travel
North Lanarkshire commentary
% of all
economically
active (16‐64 
years)
Oct
2017/Sept
2018 
NL
77.9% 
Scotland
77.6%
Oct
2023/Sept
2024 
NL
74.7% 
Scotland
76.6%
Increased 
the number 
of North 
Lanarkshire’s 
residents in 
employment
More people 
aged 16 to
64 living in
NL are
economically 
active and 
contributing 
to the local / 
national 
economy  
The latest result as at September
2024  - 164,100 residents
economically active in NL. This is
a decrease from March 2020
(170,700) and figures have not yet
returned to the pre-pandemic level
in 2019 (174,000).
% of
VAT/PAYE
registered
businesses
that survive for
at least three
years
2013-
2016 
NL
58.7% 
Scotland
62.1%
2020 -
2023 
NL
54.6% 
Scotland
56.0%
Increased and
sustained new
businesses in
North
Lanarkshire
More locally 
generated 
and incoming 
businesses 
being
created, 
surviving,
and
sustaining in 
the longer-
term  
The latest business survival rates
in NL show a varying position. 
54.6% of North Lanarkshire based
businesses registered in 2020
survived for at least three years.
This represents a slight increase
from the previous year of 54.0%. 
This latest trend follows an
increase in the national average,
although to a lesser extent. 
% of working
age people
(16-64)
claiming one or
more key
benefits
Dec 2018 
NL
3.5% 
Scotland
2.8%
Dec 2024 
NL
3.2% 
Scotland
3.1%
Reduced the 
number of
residents reliant
on employment 
related benefits
All of North 
Lanarkshire’s 
residents 
capable of 
working are
sustaining 
employment  
The latest claimant count rate for
NL (3.2%) is now lower than The
Plan for North Lanarkshire
baseline of 3.5%, with the number
of people now claiming one or
more of the key benefits is 7,070
compared to the  baseline of
7,675. 
Page 62 of 128

Page 63

ERDP Performance Framework Level 2: 
Improving economic opportunities and outcomes for all 
Key
performance
indicator
What does this tell us? Baseline By 31 March
2024
Short-term
(By 31 March 2025)
Medium-term 
By next ERDP
Review
(31 March 2028)
Long-term
(By 31
March 2035)
Actual  Target Actual Target Target
Estimated
number of
construction
jobs (PYEs)
created
The number of gross construction
jobs (PYEs) created as a result of
ERDP related investment by NLC
and our ALEOs across North
Lanarkshire. 
Construction jobs created as a
result of physical regeneration
projects occur during the
construction phase of the project
only and do not recur once the
development is operational. 
Therefore, these figures are 
reported as Person Year 
Equivalents (PYEs) rather than
Full‐time Equivalents (FTEs). 
796 2,539 3,139 3,153 4,784 7,728
Estimated
number of
gross full‐time
equivalents
(FTEs) created
The estimated number of gross
jobs (FTEs) created as a result of
ERDP related investment by NLC
and our ALEOs across North
Lanarkshire. 
As these outcomes only occur once projects are operational, there
will be a delay in demonstrating this outcome has been achieved. 
Therefore, this indicator has a long‐term target to 2035 only. 
Note: This jobs figure is based on investment across North
Lanarkshire Council’s New Supply Programme, City Deal
13,349
Page 63 of 128

Page 64

Key
performance
indicator
What does this tell us? Baseline By 31 March
2024
Short-term
(By 31 March 2025)
Medium-term 
By next ERDP
Review
(31 March 2028)
Long-term
(By 31
March 2035)
Actual  Target Actual Target Target
The gross number of jobs created
does not take account of factors
such as displacement. This
measures the follow on impact
generated once the physical works
have been completed and the new 
infrastructure is being put to
economic use. 
Programme, and the Regenerating Cumbernauld project. Fusion
Assets investments are also included.
Estimated 
number of net 
additional full-
time equivalents 
(FTE) created
The estimated number of net jobs
(FTEs) created as a result of
ERDP related investment by NLC
and our ALEOs across North
Lanarkshire. 
Under this measure, the gross
number of jobs created is adjusted
to better assess the true extent of
the likely impact of the ERDP on
the local labour market and
economy. 
This measures the follow‐on 
impact generated once the 
physical works have been 
completed and the new 
infrastructure is being put to
economic use. 
As these outcomes only occur once projects are operational, there
will be a delay in demonstrating this outcome has been achieved. 
Therefore, this indicator has a long‐term target to 2035 only 
Note: This jobs figure is based on investment across North
Lanarkshire Council’s New Supply Programme, City Deal
Programme, and the Regenerating Cumbernauld project. Fusion
Assets investments are also included.
6,879
Page 64 of 128

Page 65

Key
performance
indicator
What does this tell us? Baseline By 31 March
2024
Short-term
(By 31 March 2025)
Medium-term 
By next ERDP
Review
(31 March 2028)
Long-term
(By 31
March 2035)
Actual  Target Actual Target Target
Town centre
vacancy rates
‐ % of vacant
Commercial
units as a % of
total units across
North
Lanarkshire’s
town centres.
This indicator measures the 
level of vacant units within 
town centres. 
The ERDP aims to create vibrant
mixed‐use towns where people
live, work, shop, eat, and access
local services. 
As such, recognition needs to be
given to the fact that vacancies
may temporarily increase where
vacant possession of redundant
retail centres or land assembly is
required to enable transformative
change.
18.9% 
Year:
2018/19
This measure will be used for benchmarking purposes only and therefore
no targets have been set. 
2023/24 ‐ Latest published data shows that North
Lanarkshire’s town centre vacancy rate was 17.7%, above the
Scottish average of 12.2%. However, North Lanarkshire’s town centre
vacancy rate has fallen slightly from the 2018/19 baseline of 18.9%. 
Reshaping our town centres to ensure they provide modern and
attractive centres that meet the needs of our communities remains a key
ERDP priority and the 2024/25 ERDP Action Plan performance report
outlines key steps taken over the last 12 months to redevelop our town
centres. A separate Town Action Plan performance report has also been
prepared, focusing on short, medium and long-term progress towards
achieving the Town Visions which were approved by committee in 2021. 
% of marketable
employment 
land
The purpose of this measure is 
to contribute to the assessment of
how ‘investor ready’ North
Lanarkshire is in terms of providing
the necessary infrastructure for
new and growing businesses,
including inward investment. 
Employment land includes 
any land that is allocated for
employment use in the Local
Development Plan, or land that
has valid planning consent.  
65.7% 
Year:
2017/18
This measure will be used for benchmarking purposes only and therefore
no targets have been set. 
2023/24 ‐ Latest published data shows that 71.0% of North Lanarkshire’s 
employment land was deemed to be ‘marketable land’. This is higher
than the Scottish average of 61.8%. 
The 2023/24 NL figure is in line with the previous year (2022/23) which
was 70.4%. 
Given levels of developable land available, the council is currently
developing a Business & Industry Strategy for North Lanarkshire which
will aim to identify how council investment in such land should be
prioritised.
Page 65 of 128

Page 66

Key
performance
indicator
What does this tell us? Baseline By 31 March
2024
Short-term
(By 31 March 2025)
Medium-term 
By next ERDP
Review
(31 March 2028)
Long-term
(By 31
March 2035)
Actual  Target Actual Target Target
Marketable land is defined as land 
that meets business requirements
and has secure planning status, is
serviced or serviceable within five
years, and is accessible by
walking, cycling and public 
transport. 
Commercial
Planning
applications‐
average time
(weeks) to
process
business and
Industry
planning
applications
Planning applications are 
important in terms of the future
development and use of land
across our towns and
communities. 
An efficient and well‐functioning
planning service plays an
important role in facilitating
sustainable economic growth and 
delivering high quality
development in the right places. 
This indicator shows how long 
the council takes to deliver
commercial planning application
decisions (i.e. for business and
industry). 
6.9
weeks 
Year:
2017/18
This measure will be used for benchmarking purposes only and therefore
no targets have been set. 
2023/24 – North Lanarkshire 8.0 weeks, compared to a Scottish
average of 10.7 weeks 
The North Lanarkshire processing time has reduced from 13.5 weeks
(2020/21) and 12.6 weeks (2021/22) during the pandemic and is now
below pre pandemic levels (9.1 weeks in 2019/20). However, application
process timing remains higher than the 2017/18 baseline of 6.9 weeks.
The baseline year was a historic low and somewhat of an outlier
compared to other available data. 
Page 66 of 128

Page 67

Percentage of
premises able to
access
Superfast
Broadband
Digital infrastructure is one of 
the key gateways to achieving 
inclusive growth and prosperity. By
improving our digital infrastructure,
we will connect North Lanarkshire
to markets and opportunities.
NLC has a role alongside telecoms
companies in facilitating and
enabling the development of
effective digital infrastructure. 
The required digital infrastructure
speed needed to have superfast
broadband is 30Mbit/s. 
97.0% 
Year:
2017/18
This measure will be used for benchmarking purposes only. 
2023/24 – North Lanarkshire – 98.6% / Scotland 95.9% 
North Lanarkshire has a higher % of premises able to access superfast 
broadband compared to the Scottish average.
Carbon Dioxide 
(CO2) emissions
area wide per
capita (tonnes)
Sustainability is one of the key
principles which underpins the
ERDP. 
These estimates can assist us 
in understanding our
environmental impact and can 
be used to inform our actions 
against climate change and 
towards North Lanarkshire’s 
target of achieving net zero 
emissions by 2030.
5.92t per 
capita 
Year: 
2014/15
This measure will be used for benchmarking purposes only. 
2022/23 – North Lanarkshire 4.82t CO2 / Scotland 4.81t CO2 
North Lanarkshire’s CO2 emissions is similar to the Scottish average on
a per head basis. Emissions have fallen over the last decade with the
2022/23 (latest available) data at a near historic low. 
Emissions were only lower in 2020/21 (4.56t CO2) which was during the
lockdown period of the pandemic, which likely resulted in reduced
emissions from less traffic on roads and some industries reducing their
operations. 
Page 67 of 128

Page 68

ERDP Performance Framework: Level 3 
Day to day operations 
Priority 1: Developing housing that promotes improved quality of life and creates a better place to live 
Why is this set of indicators of interest? The Plan for North Lanarkshire ambition
statement alignment
This reflects the council’s commitment (through the Local Housing Strategy and Transforming
Places Programme of Work) to promote a supply of good quality affordable housing across all
tenures. 
This also supports the Strategic Housing Investment Plan (SHIP) which helps deliver Local
Housing Strategy priorities and maximise resources in the Affordable Housing Supply
Programme. 
The target to deliver 6,000 new homes by 2035, includes over 1,800 homes to be acquired
through the open market purchase scheme (an extension of the empty homes purchase
scheme).
1. Ensure a housing mix that supports
social inclusion and economic growth. 
2. Refocus our town centres and
communities to be multifunctional
connected places which maximise social,
economic, and environmental
opportunities. 
Page 68 of 128

Page 69

Key
performance
indicator
What does this tell
us?
Baseline Note: these figures are cumulative and not additional to each other Lead
Team(s) By
2023/24
Short-term Medium-
term
Long-term
2024/25 2025/26 By next
ERDP
Review
(2027/28)
2034/35
Actual Target Actual Target Target Target
Number of
new build
Council
house
completions
The number
of new build council
house completions
via the council’s
New Supply
Programme
633 
Years: 
2010/11
–
2018/19
1,351 1,619 1,629 
Green
1,672 2,300 4,155 New
Supply
Number of
Open Market
Purchase
Scheme
completions
The number of
homes brought into
Council ownership,
Including some
homes previously
sold under the Right
to Buy
133 
Years:
2010/11
–
2018/19
753 853 845 
Green
973 1,145 1,845 New
Supply
Household
connectivity
capacity
The % of new build
homes (via the New
Supply Programme)
with high quality
digital infrastructure
79% 
Years:
2010/11
–
2018/19
90% 91% 92% 
Green
92% 94% 96% New
Supply 
Page 69 of 128

Page 70

ERDP Priority 1 Performance Summary: 
Total number of indicators Number of indicators with
‘Green’ status
Number of indicators with
‘Amber’ status
Number of indicators with
‘Red’ status
3 3 0 0
Success to date The New Supply Programme was introduced in 2010/11 and NLC has set an ambitious target of
delivering 5,000 council homes by 2035. In February 2025, Housing Committee agreed to increase this
target to 6,000 homes by 2035. 
This will be achieved via a combination of new build, purchasing from the private sector (off the shelf) and
buying existing homes via the Open Market / Empty Homes Purchase Schemes:
• 2,474 homes have been delivered via the New Supply Programme, at 31 March 2025.This
includes 845 homes acquired via the Open Market and Empty Homes Purchase Schemes.
• NLC’s first low carbon (net zero) homes were completed at Dykehead Road, Airdrie in 2022/23.
These homes feature air source heat pump heating systems, battery storage and enhanced
photovoltaic panels. In 2024/25, new homes featuring ground source heat pump heating systems
were completed at Brandon Street, Motherwell.
• All NLC new build developments with building warrant submissions from April 2024 will include
non-gas, zero emission heating systems as standard. This approach supports our strategy of
delivering energy efficient and sustainable housing across North Lanarkshire. 
• As part of our new council house building programme we maximise the delivery of community
benefits. These form part of our valuation process when we’re reviewing contracts for our new
build projects and these benefits are key to supporting communities, future workforce and local
people.
• In 2023/24, a new amenity house opened in Castlehill Road, Wishaw for local residents to enjoy,
meet and socialise together. This is just one of the community benefits delivered as part of our
New Supply Programme.
• We’re also helping young people towards positive outcomes and work with education, supported
enterprise and employability teams to help facilitate work experience and opportunities to positive
destinations within construction. For example, during 2024/25, McTaggarts Construction
supported 7 students from Buchanan High School, Coatbridge, through their Construction Skills
Certification Scheme (CSCS) training and assessments.  
Page 70 of 128

Page 71

Challenges Various external factors such as inflationary pressures across the UK economy and the wider
international geopolitical environment have impacted construction and materials costs. 
Despite these challenges, the programme is progressing well and all 3 related ERDP Priority 1
Performance Indicators were met or exceeded by 2024/25. 
Priority 2: Reshaping our town centres to ensure that they provide modern and attractive centres that meet the needs of our
communities 
Why is this set of indicators of interest? The Plan for North Lanarkshire ambition
statement alignment
A key priority within the Transforming Places Programme of Work Delivery Plan is the
regeneration of North Lanarkshire’s town centres and their redevelopment as modern, high‐
quality, mixed‐use spaces with a much stronger focus on residential provision.
1. Ensure a housing mix that supports
social inclusion and economic growth. 
2. Refocus our town centres and
communities to be multifunctional
connected places which maximise social,
economic, and environmental
opportunities. 
Page 71 of 128

Page 72

Key
performance
indicator
What does this tell
us?
Baseline Note: these figures are cumulative and not additional to each other Lead
Team(s) By
2023/24
Short-term Medium-
term
Long-
term
2024/25 2025/26 By next
ERDP
Review
(2027/28)
2034/35
Actual Target Actual Target Target Target
Investment
made in town
centre
developments
The amount (£)
invested in North
Lanarkshire’s town
centres to enable
sites to be
repurposed or
redeveloped.
This includes
NLC investment
and external funding
sources.
£29.8m 
Years:
2010/11
–
2018/19
£91.9m £114.5m £119.7m 
Green 
£134.5m £218.7m  £307.5m  City Deal &
Regeneration
/ New Supply
External
funding
secured for
town centre
regeneration
projects
The amount (£) of
external funding 
secured for town
centre regeneration 
projects in North
Lanarkshire’s town
centres
£9.26m 
Years:
2010/11
–
2018/19
£44.3m £54.7m £56.6m 
Green 
£62.2m £93.8m £148.3m City Deal &
Regeneration
/ New Supply
Number of
town centre
buildings
and/or sites
repurposed or
redeveloped
The number of
existing buildings or
vacant sites within
North Lanarkshire’s
town centres, which
have been
repurposed 
or redeveloped.
34 
Years:
2010/11
–
2018/19
59 64 63 
Amber
67 82 92 City Deal &
Regeneration
/ New Supply
/ RSL’s
Page 72 of 128

Page 73

Key
performance
indicator
What does this tell
us?
Baseline Note: these figures are cumulative and not additional to each other Lead
Team(s) By
2023/24
Short-term Medium-
term
Long-
term
2024/25 2025/26 By next
ERDP
Review
(2027/28)
2034/35
Actual Target Actual Target Target Target
Number of
new
affordable
homes
completed
within town
centres (or
edge of town) 
The number of units 
either converted to
residential or new
build house
completions by NLC
or RSLs within 
town centres
887 
Years:
2010/11
–
2018/19
1,692 1,797 1,797 
Green 
1,876 2,511 2,688 New Supply /
City Deal &
Regeneration
/ RSL’s 
ERDP Priority 2 Performance Summary: 
Total number of indicators Number of indicators with
‘Green’ status
Number of indicators with
‘Amber’ status
Number of indicators with
‘Red’ status
4 3 1 0
Success to date Since the ERDP was introduced in 2019, eight town visions have been developed for Airdrie, Bellshill,
Coatbridge, Cumbernauld, Kilsyth, Motherwell, Shotts and Wishaw. 
Town Action Plans have been developed for Airdrie, Bellshill, Kilsyth, Motherwell, Shotts and Wishaw,
outlining the short, medium and long‐term actions required to realise the visions for each of these towns. 
A Neighbourhood Board has been established in Coatbridge. The board will drive the development and
delivery of a Regeneration Plan for Coatbridge, aligned to the Town Vision, which will be submitted to the
UK Government during 2025/26. This will include a four-year investment plan towards drawing down the
first tranche of funding from the £19.5 million allocated to Coatbridge over the next 10 years. 
Page 73 of 128

Page 74

The council acquired The Centre Cumbernauld in June 2023, a major milestone in the redevelopment of
Cumbernauld town centre. Proposals are now being developed for the phased redevelopment of the town
centre. 
Almost £120 million has been invested in towns since the launch of the ERDP in 2019, with key projects
including:
• The acquisition of key town centre properties, with plans to convert to residential developments. This
includes Motherwell Old Town Hall, Bank Street and Main Street (Coatbridge), the former, Kings
House (Wishaw) and the former Methodist Church (Wishaw).
• Following the acquisition of the former YMCA building (Brandon Street, Motherwell), this property has
now been converted to 6 new flatted units for social rent and a further 42 new build units were
developed on an adjacent parcel of vacant land. Residents are now enjoying the benefits of these
new council homes.  
• Enabling the regeneration of the former Orrs building in Airdrie, which completed in 2024
• The acquisition of The Centre Cumbernauld in June 2023, unlocking the major regeneration of
Cumbernauld town centre.
• Major improvements to community facilities such as Motherwell Library.
• A 2.3km Green Route, connecting Cumbernauld town centre with surrounding communities such as
Kildrum and Carbrain.
1,797 town centre homes have also been delivered via NLC and Registered Social Landlords (RSLs) as
part of the Strategic Housing Investment Plan (SHIP). This includes homes within a 10‐minute walk of
town centres, in line with the 20‐minute neighbourhood definition.
Challenges Various external factors such as inflationary pressures across the UK economy and the wider
international geopolitical environment have impacted construction and materials costs. 
Challenging public finances over the last few years have also put a recent strain on the availability of
external government funding towards capital projects, such as the recent pausing of the Scottish
Government’s Regeneration Capital Grant Fund (RCGF) and Vacant and Derelict Land Investment
Programme (VDLIP), as well as delays in confirming Place Based Investment Programme budgets for
2025/26. 
Despite this, progress continues towards reshaping and repopulating our town centres. The council
continues to engage with property and landowners to acquire buildings/land which are strategically
aligned with our redevelopment plans. However, a key challenge is managing owner’s expectations
around property/land value, ensuring best value is achieved.
Page 74 of 128

Page 75

Priority 3: Improve our business and industrial infrastructure, creating opportunity for investment and for companies to start-up or
relocate here 
Why is this set of indicators of interest? The Plan for North Lanarkshire ambition statement
alignment
Although North Lanarkshire has a significant amount of industrial land and
premises, some are not suitable for today’s needs. To enable our people and
businesses to thrive we’ll invest in business and industrial space and in
marketing North Lanarkshire as the place to invest and work.
2. Refocus our town centres and communities to be
multifunctional connected places which maximise social,
economic, and environmental opportunities. 
3. Maximise the use of our marketable land and assets
through improved development in business and industrial 
infrastructure. 
16. Transform our natural environment to 
support wellbeing and inward investment 
and enhance it for current and future 
generations 
Page 75 of 128

Page 76

Key
performance
indicator
What does this
tell us?
Baseline Note: these figures are cumulative and not additional to each other Lead
Team(s) By
2023/24
Short-term Medium-
term
Long-
term
2024/25 2025/26 By next
ERDP
Review
(2027/28)
2034/35
Actual Target Actual Target Target Target
Investment
made
towards the
development
of 
business and 
industrial
infrastructure
The amount 
(£) invested in 
business and
industry zoned
land or upgraded
to existing 
business and
industrial
infrastructure
across North
Lanarkshire.
This includes NLC
and ALEO funding 
only. 
£0.524m 
Year: 
2018/19
£4.65m £7.89m £8.25m 
Green
£9.25m  £11.75m £18.15m Fusion
Assets / NLP
/ City Deal &
Regeneration
External/priv
ate
sector/loan
funding
secured for 
office and 
industrial
development
The amount (£) of
external, private or
loan funding
secured for
investment in
office and
industrial
developments
across North
Lanarkshire.
£1.3m 
Year: 
2018/19
£22.35m £27.35m £40.41m 
Green
£46.30m £48.7m £56.3m Fusion
Assets / City
Deal &
Regeneration  
Page 76 of 128

Page 77

Ha of land
improved for
business and
industrial use
The amount (Ha)
of land remediated
or improved for
business and
industry use
across North
Lanarkshire
3.61ha 
Year: 
2018/19
10.29ha 14.26ha 12.47ha 
Amber
14.6ha 15.0ha 16.0ha Fusion
Assets / City
Deal &
Regeneration
Sq.ft of 
commercial
workspace
created or
refurbished
The amount
(square footage) of
Commercial
workspace created
or refurbished 
as a result of
investment by
NLC, Fusion
Assets or North
Lanarkshire
Properties across
North Lanarkshire
18,000
sq.ft 
Year:
2018/19
132,910
sq.ft
160,658
sq.ft
169,733
sq.ft 
Green
221,000
sq.ft
268,000
sq.ft
470,000
sq.ft
Fusion
Assets / City
Deal &
Regeneration 
Page 77 of 128

Page 78

ERDP Priority 3 Performance Summary: 
Total number of
indicators
Number of indicators with ‘Green’
status
Number of indicators with
‘Amber’ status
Number of indicators with
‘Red’ status
4 3 1 0
Success to date Since the introduction of the ERDP in 2019, an additional 151,700 sq.ft of commercial workspace has been
created, including 40,500 sq.ft at Gartcosh Industrial Park (buildings 2 and 3). 
During 2023/24, Fusion Assets acquired Plot One at the former Ravenscraig steelworks site in Motherwell.
Following the remediation and servicing of the 6.4 acre development site, Fusion Assets will bring forward plans
for a multi let industrial scheme. 
Fusion Assets completed the construction of a new 15,500 sq.ft, net zero carbon enabled, industrial building at
Link Park, Newhouse during 2023/24, which was immediately let for a new Scottish depot for a multinational
company 
Construction on the third and final building at Link Park, Newhouse began in February 2025. This project is
scheduled to complete in December 2025 and will deliver 19,753 sq.ft of new industrial workspace. 
Enabling works were completed in June 2023 at Gartcosh Industrial Park (Phase 3). This site has planning
approval for the construction of up to four new industrial units, totalling 62,000 sq.ft. 
11,410 sq.ft has been developed at Spruce Court within Orbiston Street Industrial Estate, Motherwell. This has
provided new start‐up units for SMEs as well as a unit for New College Lanarkshire students as part of an
initiative to support young entrepreneurs who are setting up a business within the area. 
The council has also secured £1.9M from the Scottish Government’s Regeneration Capital Grant Fund which
will contribute to the significant redevelopment of Braidhurst Industrial Estate in Motherwell. This project will see
the upgrading of the existing units owned by North Lanarkshire Properties as well as the construction of
industrial units suited to local small‐medium sized enterprises (SMEs). 
Lastly, the council continue to receive ring‐fenced Vacant and Derelict Land Fund (VDLF) funding from the
Scottish Government (subject to the submission and approval of an annual VDLF Local Delivery Plan) and
continue to focus this investment towards the creation of new industrial and business space and ultimately new
jobs.
Page 78 of 128

Page 79

Challenges Various external factors such as inflationary pressures across the UK economy and the wider international
geopolitical environment have impacted construction and materials costs. 
High interest rates for loan finance and lower investment yields have also impacted on the viability of externally
funded projects which Fusion Assets looks to deliver, either solely or as a joint venture. 
This has caused some delays to projects and investments made. Despite these challenges, good progress has
been made against improving our business and industrial infrastructure, as demonstrated in the “success to
date” section above. 
Braidhurst Industrial Estate was chosen as a demonstrator project for improvements to our local light-industrial
stock. This pilot project has experienced significant cost overruns due to rising material costs and inflation as
well as abnormal costs due to the condition of the aging NLP units, which required significant works to upgrade
electrics and to improve the energy efficiency of the units. These works, as well as significant wait times getting
the utility companies onsite, have caused severe delays to programme which also substantially increasing costs
to the project.   
Priority 4: Continuing to improve our connectivity and develop new opportunities to transform our road, rail and digital infrastructure 
Why is this set of indicators of interest? The Plan for North Lanarkshire ambition
statement alignment
Another key priority within the Transforming Places Programme of Work is the delivery of
the City Deal Infrastructure programme which aims to increase Gross Value Added
across the entire Glasgow City Region by providing increased access to jobs through
improved connectivity to centres of employment and opening up development
opportunity. 
We will connect North Lanarkshire to markets and opportunities by improving our strategic
infrastructure.
2. Refocus our town centres and communities to
be multifunctional connected places which
maximise social, economic, and environmental
opportunities. 
4. Market and promote North Lanarkshire as the
place to live, learn, work, invest, and visit. 
5. Grow and improve the sustainability and
diversity of North Lanarkshire’s economy 
16. Transform our natural environment to 
support wellbeing and inward investment 
and enhance it for current and future generations
Page 79 of 128

Page 80

Key
performance
indicator
What does this
tell us?
Baseline Note: these figures are cumulative and not additional to each other Lead Team(s)
By
2023/24
Short-term Medium-
term
Long-
term
2024/25 2025/26 By next
ERDP
Review
(2027/28)
2034/35
Actual Target Actual Target Target Target
Investment 
made in key 
infrastructure 
projects 
(including 
City Deal 
projects) to 
date
The amount (£)
invested in key
infrastructure
projects (including
investment made
in City Deal
projects to date).
This includes NLC
direct investment
and Glasgow City
Region City Deal
funding. 
£6.8m 
Years: 
2015/16
–
2018/19
£55.16m £68.12m £62.3m 
Amber
£69.89m £154.44m £243.45m City Deal &
Regeneration
Number of 
key
infrastructure
contracts
completed
The number 
of key Enterprise
Projects or City
Deal infrastructure
Contracts
completed.
A long‐term
project can contain 
Multiple contracts
3  
Years: 
2015/16
–
2018/19
13 17 16 
Amber
21 27 30 City Deal &
Regeneration  
Page 80 of 128

Page 81

Km of active 
travel routes
The amount (Km)
of active travel
routes created
which will improve
the ability of all
people to walk,
wheel and cycle
throughout North
Lanarkshire. This
will help reduce
Inequalities by
providing people
with more 
Opportunities 
to access
employment, 
local services, 
education or 
training. 
0km 
Year:
2018/19
17.2km 21.8km 19.85km 
Amber
24.3km 70km 155km Infrastructure
&
Transportation 
Page 81 of 128

Page 82

ERDP Priority 4 Performance Summary: 
Total number of indicators Number of indicators with
‘Green’ status
Number of indicators with
‘Amber’ status
Number of indicators with
‘Red’ status
3 0 3 0
Success to date The direct deliverable successes to March 2025 relate to infrastructure delivery completed or in progress;
procurement activity progressed, and contracts awarded; project development and delivery investment. 
The indirect deliverable successes to March 2025 relate to economic benefits realised; the impact of GCR
City Deal investment in addressing market failure and providing improved confidence to the market, people
and businesses to locate in North Lanarkshire. These successes are monitored through ongoing benefits
monitoring data and through evidence of market interest (through planning applications, proposal of
application notices, commercial enquiries). 
The following headline successes has been achieved since the commencement of the council’s City Deal
Infrastructure Investment Programme:
• £62.3m City Deal Programme investment to March 2025 (project development and delivery)
• 16 infrastructure contracts delivered (City Deal contracts and other infrastructure contracts to support
core City Deal projects). 
Gartcosh/Glenboig Community Growth Area (CGA):
• Gartcosh Business Park to Glenboig Link Road project delivered (comprising three works contracts).
• Benefits realisation has commenced as a result of the Glenboig Link Road project with housing
developments at Gartcosh/Glenboig CGA and Fusion Assets investment in commercial/industrial units
at Gartcosh Business Park. There has also been evidence of market interest (both residential and
commercial) in the area. 
Motherwell Town Centre Transport Interchange: 
• Motherwell Station Park and Ride expansion project delivered.
• Muir Street Interchange works completed in May 2023. 
Ravenscraig Infrastructure Access (RIA) South:
• West Coast Mainline Crossing guided into place under a closure of the rail line in April 2023. 
• Demolition works completed to former business properties at Manse Road and Windmillhill Street during
2024/25.
Page 82 of 128

Page 83

East Airdrie Link Road (EALR)
• Tender for consultancy services for stage 3 of the project issued, evaluated and contract awarded.
Outline Business Case approved August 2024. 
A8/M8 Corridor Access Improvements: 
• Options appraisal and concept design work progressed for Phase 1 and 2 of Eurocentral Strategic
Active Travel Links project. 
• Consultants have now been appointed to prepare detailed designs, which is progressing well. 
Active Travel
• Motherwell Station Active Travel Links Phase 1 (West Hamilton Street to Motherwell Civic Centre; Hope
Street, Muir Street and Pollock Street) works completed on West Hamilton Street and from Asda to
Camp Street at the Civic Centre.
• Ravenscraig Active Travel Link Phase 2 works completed; feasibility study and options appraisal
commission progressed for active travel links between Courington Road, Motherwell and Ravenscraig
Regional Sports Facility with final outcome of the study due Summer 2025.
• Alexander Street, Wishaw, Active Travel and Road Safety Improvements: construction completed.
• Meadowhead, Wishaw, Active Travel and Road Safety Improvements: construction completed.
• Glasgow Road, Wishaw, Active Travel and Road Safety Improvements: detailed design finalised and
Phase 1 constructed.
• Carnbroe Community Hub, Active Travel Links: detailed designs finalised and construction completed. 
Challenges Over the last 4 years in particular, a variety of external factors and challenges have affected construction
and infrastructure activity which have impacted on project programmes and milestones: 
Various external factors such as the Covid‐19 pandemic, Brexit, the wider geopolitical environment and
rising inflation across the UK economy have impacted construction and materials costs. Labour market and
material supply issues have continued to impact on tender costs and put pressure on delivery timescales. 
Ravenscraig Infrastructure Access South – due to identified drainage design issues within the Motherwell to
Ravenscraig works tender package, the decision was made not to continue with the works tender to the
planned programme. This impacted upon the projected spend profile and programme for the RIAS project.
A revised procurement strategy for development of the new road between Windmillhill Street and the
Ravenscraig Regional Sports Facility is now being taken forward as a series of smaller, related work
phases. Spend profiles for future years will be based on this revised strategy. 
Page 83 of 128

Page 84

Advance demolition works at the former Evans Halshaw garage, former Cook and Indiis and YESS
electrical site were progressed, to prepare the land for construction of the new road. A Value Engineering
review commission has been awarded and is progressing. This will inform the revised detailed design. 
East Airdrie Link Road – the consultancy commission for preliminary design and statutory approval services
for the East Airdrie Link Road has progressed well, with an updated alignment for the link road prepared
and Environmental Impact Assessment work underway. Dialogue with NHS Lanarkshire on project
interfaces with the Monklands Replacement Hospital Project has also progressed. Preparations were made
for public consultation and submission of a PAN notice to the Planning Service. 
Active Travel infrastructure – the council is continuing to progress strategic Active travel projects in 
accordance with the priorities identified in its Active Travel Strategy, including improving active travel 
connections to new Community Hubs. However, progress with delivering new/improved routes is largely 
dependent on availability of external funding with allocations generally made on an annual basis which 
makes forward planning more challenging. 
Page 84 of 128

Page 85

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref (AG/PK) Date 29/08/25 
NL Employer Charter 
From  Alison Gordon, Chief Social Work Officer (Education, Families, Justice &
Integration)  
E-mail gordonal@northlan.gov.uk Telephone 01698 332001 
1. Background
1.1 Brighter Futures is one of the seven strategic Programme of Work areas approved by
the Policy and Strategy Committee which guides the work of the Council until 2028. 
Within the Brighter Futures Programme of Work there are a number of workstreams
and activities being led and delivered by a broad range of teams and operational
Executive Summary 
Within the current Plan for North Lanarkshire the Brighter Futures programme of work is
delivering activities across several workstreams and an update on the achievements
across all Programmes of Work is being reported to the Policy and Strategy Committee. 
One of the deliverables featured within the Brighter Futures programme of work is to
develop and embed the NL Employer Charter within a broad range of businesses.  This
work is relevant to the remit of the Enterprise and Fair Work Committee in its promotion of
local economic development and work with local employers encouraging fair work practices
in our local economy.  A detailed description of the charter and its work to date are provided
within the report for Committee to consider. 
Recommendations 
It is recommended that the Enterprise and Fair Work Committee: 
(1) Recognise and endorse the role the NL Employer Charter has in supporting the
engagement of employers with Council services and in aligning local employers with
the aims of the Council. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (5) Grow and improve the sustainability and diversity of North
Lanarkshire's economy
Programme of Work Brighter Futures
Item 6
Page 85 of 128

Page 86

programmes.  These inform the One Council Delivery Plan which sets out the portfolio
of programmes, projects, and activities to support delivery of the Programme of Work
to 2028.  Brighter Futures aims to achieve the following:
To support and improve educational attainment, employment opportunities,
entrepreneurship, and volunteering and prepare young people and the wider
community for the future through specialised education, voluntary work and
enterprise. This programme will give them the skills, knowledge, and confidence to
successfully transition to further education, training or employment. This will shape
innovative employment pathways and maximise key industry growth sectors to boost
economic growth. This will provide opportunities to develop real-world job skills that
add value and pathways to specific industries and help to offer choice and inclusive
access to jobs and training.
1.2 Given the aims of Brighter Futures it was identified early in the programme that
engagement with employers would be a significant factor in its effective development. 
It was agreed that one of the ways this could be facilitated was through the
development of formal recognition for the work of employers that support the Council
in achieving its ambitions and this led to the development of the NL Employer Charter.
1.3 The charter was designed to maintain and support a network of employers across
North Lanarkshire, to engage and influence local employers to work fairly and
responsibly and to formally acknowledge those employers that already work in a such
a manner.   At its core the charter is an employer accreditation scheme, developed to
drive forward improvements across North Lanarkshire’s labour market, benefiting
employers, employees and the local community and with accreditation assessed
objectively on four core areas. The scheme is the only employer accreditation scheme
offered by a local authority in Scotland, membership is free and open to businesses
of all sizes within North Lanarkshire and to those outwith the local authority area that
contribute to the local community and economy.         
2. Report 
Charter Design and Operating Principles 
2.1 The NL Employer Charter is designed and managed by the employability team to offer
tangible benefits to employers in return for measuring their business against key areas
in which the Council would like to drive improvements.   These benefits include: 
• Recognition as an exemplar local employer, committed to helping the North
Lanarkshire economy recover and grow, through adopting the highest employment
standards and practices.
• Access to support, expertise and, where appropriate, funding to help develop and grow
a capable and resilient future workforce which supports their business goals and aims.
• To boost the company profile through publicity, promotion and attracting new talent to
the labour market.
• To gain access to contacts via scheme networking and partnership opportunities,
helping to demonstrate the quality of the business when seeking new business
opportunities.
• To be recognised as a business which is contributing to wider economic prosperity and
sustainability and helping to keep consumer spend in North Lanarkshire.
• Public recognition of these businesses’ support for the charter or having been
recognised as a charter member.
Page 86 of 128

Page 87

2.2 Accreditation focuses on compliance with four key principles, which are aligned to
positive developments in the local economy, and which are reflected in the pillars of
the scheme. These are: 
• Fair Pay:  increasing average weekly wage in line with the Fairer Scotland Duty 
- all directly employed staffed are being paid the Real Living Wage (currently £12.60
per hour) and this can be confirmed by evidence 
or 
- Employer is actively working towards paying the Real Living Wage within the next
12 months. 
• Employ North Lanarkshire – ensuring that job opportunities go to NL residents. 
- Employer is committed to engaging with North Lanarkshire’s Working employability
service when new employment and apprenticeship opportunities arise within the
organisation.
- Employer promotes and provides apprenticeship / work experience /
work placements and actively engages with local schools and developing the young
workforce.
- Employer promotes volunteering and volunteering opportunities within the wider
community. 
• Buy North Lanarkshire – enhancing supply chain / procurement / community
benefits.
- Employer commits to including North Lanarkshire businesses in its supply
chain wherever possible within the next 12 months.
- Employer is involved in providing community benefits and/or social value through
public sector procurement of goods and services. 
• Be the Best – ensuring fair work practices which attract and retain employees.
- Employer offers flexible working and family friendly working practices.
- Employer offers workforce training, development, and progression.
- Employer has a health and well-being policy.
- Employer has an equality and diversity policy. 
2.3 Awards are made based on the level of compliance with the above specific criteria and
sign up in principle to the charter, working towards meeting the criteria outlined under
each of the four pillars. 
• Bronze Award winners will be able to evidence meeting criteria in two of the pillars
• Silver Award winners will meet some of the criteria in each of three pillars and be
working towards meeting all.
• Gold Award winners will be able to evidence meeting each of the specific criteria in
all four pillars. 
Employers achieving the highest level of accreditation would be seen as having a
strategic level of engagement with high participation and contribution to the North
Lanarkshire labour market.   
Page 87 of 128

Page 88

Operation of the NL Employer Charter 
2.4 To date 68 businesses have been accredited, 18 achieving a Gold Award, 27 Silver
and 23 Bronze. A list of these businesses is included in Appendix 1.  There are currently
22 businesses being supported through the accreditation process to achieve an award.
Growth has steadily increased year on year with Employability Development Officers
generating new leads as part of their business development activities, 26 employers
are currently being progressed to the initial application stage to then begin the
accreditation process.  There are 14 businesses that have applied for accreditation and
have not met the criteria for a Bronze Award and are being supported to meet at least
all criteria within two pillars to meet the minimum requirement for Bronze. 
2.5 Accredited members are case managed within the Employability Services Team.
Following the panel review and award decision, recommendations are made for areas
of improvement with support provided, to reach the highest level of accreditation
possible. Feedback from accredited members has been incredibly positive with one of
the benefits of the scheme being the provision of an extra point of contact for
businesses with the Council.   
2.6 Businesses who have been granted awards are sent a digital logo to display on their
email signatures, website, and social media platforms.  They are also presented with a
plaque to display within the organisation and a marketing pack.  Accreditation is for a
period of three years and evidence is refreshed on an annual basis and businesses
that have been granted awards have their logos / details displayed on North
Lanarkshire’s Working and NLC website pages.  Finally, as part of the marketing for
the charter, and to demonstrate to businesses the high level of recognition within which
the Council views the awards, many businesses have been visited by The Provost, with
photographs and a press release created to promote their achievement. 
Celebration Event
2.7 A Business Breakfast event was held at Gartlea Community Centre on 29th April to
recognise and celebrate members of the NL Employer Charter for their high standards
of excellence, their commitment to investing in their employees, being a positive
employer and a responsible business. Presentations were delivered by the Chief
Executive, Depute Chief Executive and local employer ACS Clothing, with The Provost
presenting 14 recently accredited businesses with their awards.  
2.8 83 people attended the event, 56 of those from businesses in North Lanarkshire, and
a post evaluation survey showed that all attendees enjoyed the event, benefited from
networking opportunities, and would attend future gatherings, with particular interest
shown in business support, employability and social value.  Quarterly events are being
organised to allow businesses the opportunity to find out more about the council
services available and for like-minded businesses to network with each other.  The next
event is planned for the end of September. 
3. Measures of success 
3.1  Measures of success include:
• The NL Employer Charter supports a growing network of fair and responsible
employers across North Lanarkshire and encourages positive developments in the
Page 88 of 128

Page 89

local labour market benefiting employers, employees and the local community. 
4. Supporting documentation 
4.1  Appendix 1 – Employer Charter Companies 
Alison Gordon
Chief Social Work Officer (Education, Families, Justice & Integration)
Page 89 of 128

Page 90

5. Impacts   
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Page 90 of 128

Page 91

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Managing and monitoring service performance supports the ongoing monitoring of
the service’s risk register. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 91 of 128

Page 92

APPENDIX 1 NL Employer Charter Members 
Gold Members
ACS Clothing
All Star Joinery
Antibody Analytics 
Belac Group (no longer trading)
Cumbernauld Theatre Trust
DMI Fire & Security
G4 Claims Ltd
Glass Systems Ltd
Lanarkshire Carers
McTaggart Construction
Mears
Morgan Sindall
North Lanarkshire Carers Together
POS Group Limited
Routes to Work
Secureshield Ltd
Swagelok Scotland
Viridor 
Silver Members
Active Access Ltd
Andersen Caledonia Ltd
Antibody Company
Balfour Beatty PLC
BEC Machined Plastics & Engineering Supplies
Bells Food Group Ltd
CD Architects
Cumbernauld & Kilsyth Care
DMG Services Group Ltd
Door & Gate Engineering Services Ltd
Elcom Networks Ltd
Enevate Homes Limited
FBD Consultancy Accounts & Tax Ltd
Greenerleaf Estate Maintenance Ltd 
Hair Design Airdrie (no longer trading)
Hot Worx Ltd
Igne
Indeglas Limited
Moock Environmental Solutions Ltd
Newmains Community Trust
Peter Campbell (Sales) Ltd
Ponies Help Children
Preah Building Services Ltd
Saltire Facilities Management Ltd
St Phillips Residential Care & Education Services
Streetwise
The Power Within Training 
Bronze Members
Caveman Designz Ltd
Clarke Fire Protection Products Ltd
Page 92 of 128

Page 93

Cliftonville & Coatdyke Community Centre
Diverse Investments Scotland Ltd (Newton Waste)
Document Data Group
Emarr Telecommunications
Equal Say
GCN Ltd
GR Contracts Ltd
Health and Wellbeing Hub
Inex Works Group Ltd
Ko-nekt
Netzero Facades Ltd
Paradigm Reinstatements Ltd
Potential Living
Premier Property Solutions
Pulptec Ltd
Soundex Partitions Ltd
SRB Wealth Management
Stewart- Buchanan Gauges Ltd
Telecom Networks
WH&R McCartney Insurance Brokers
WQS Wonderseal Ltd 
Page 93 of 128

Page 94

Page 94 of 128

Page 95

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref (AG/PK) Date 29/08/25 
UKSPF Employability Programmes 
From  Alison Gordon, Chief Social Work Officer (Education, Families, Justice &
Integration)  
E-mail gordonal@northlan.gov.uk  Telephone 01698 332001 
Executive Summary
Within the current Plan for North Lanarkshire the Brighter Futures programme of work is
delivering activities across several workstreams and an update on the achievements
across all Programmes of Work is being reported to the Policy and Strategy Committee.  
One of the deliverables featured within the Brighter Futures programme of work is the
integration of the UK Shared Prosperity Fund (UKSPF) with Council led employability
programmes and priorities.  This work is relevant to the remit of the Enterprise and Fair
Work Committee in its promotion of local economic development and increasing the
employment rate in our communities for unemployed and economically inactive residents
to ensure they are included in the ongoing economic growth of North Lanarkshire. 
This report will provide detail on the implementation and performance of the UKSPF
employability programmes delivered over the last two years from 2023/24 to 2024/25 and
how this has supported the design of the current one-year programme being delivered in
2025/26.   
Recommendations
It is recommended that the Enterprise and Fair Work Committee: 
(1) Note the information provided on the delivery of the UKSPF employability
programmes from 2023/24 to 2024/25 and endorse plans for 2025/26. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement
(11) Increase economic opportunities for adults by understanding,
identifying, and addressing the causes of poverty and deprivation
and barriers to financial inclusion
Programme of Work Brighter Futures
Item 7
Page 95 of 128

Page 96

1. Background 
1.1 North Lanarkshire Council was allocated £13.871m from the UKSPF to deliver projects
across four key themes (Communities and Place, People and Skills, Supporting Local
Business and Multiply) from 2023/24 to 2024/25.   North Lanarkshire’s Investment Plan,
approved by the Enterprise, Growth and Fair Work Committee on 29 August 2022,
formed part of the wider Glasgow City Region Investment Plan, which was approved
by the UK Government on 5 December 2022. 
1.2 Within the Council’s UKSPF Investment Plan £3,439,830 was allocated to employability
programmes that targeted support on unemployed and economically inactive residents,
and these were designed to be the successor programmes to the long-standing EU
funded employability programmes that had been delivered across North Lanarkshire
previously.  The UKSPF programmes to be delivered were split between two
interventions known as S31 and S35.  Broadly speaking S31 targeted those who are
economically inactive and S35 targeted those who are unemployed but who have
barriers to entering a job.  In line with previous requirements by external funders, match
funding from the Employability core budget was also allocated to the delivery of these
projects. 
1.3 S31 was named Working Matters and S35 was named North Lanarkshire’s Working, in
keeping with the established brand for the delivery of Council funded employability
support in North Lanarkshire.
2. Report 
2.1 The performance, both financially and in terms of outcomes is described below for both
programmes. 
2.2 S31 Working Matters 
Working Matters provided place-based employability support for economically inactive
residents of North Lanarkshire with intensive and wrap-around support to move those
furthest from the labour market closer to mainstream provision and employment,
supplemented by additional and/or specialist life and basic skills and was delivered by 
by Routes to Work Ltd.  The project also had support from the employability team and
used peer mentors, life coaches and financial wellbeing advice to engage and move
people toward better economic, health and social outcomes that match their individual
needs and promote increased community cohesion.   Overall funding and performance
in terms of engagements and job outcomes are given below. 
Table 1: S31 Working Matters Funding
Apr 2023 – Mar 2025 Forecast Actual Variance
UKSPF £582,830 £582,830 0
NLC Match  £693,646 £366,491 -£327,155 (-47%)
Total Cost £1,276,476 £949,321 -£327,155 (-25%) 
Table 2: S31 Working Matters Outcomes
Apr 2023 – Mar 2025 Target Actual Variance
Registered  375 194 -181 (-48%)
Job Outcomes  96 (25%) 77 (40%) -19 (-20%)
Sustained job 70% 76% 6% 
The profile of those registered and engaged on S31 Working Matters was that 80%
came from the most deprived 20% SIMD areas of North Lanarkshire and 64% were
female with 36% men.  This is in contrast to most employability programmes where
Page 96 of 128

Page 97

there are almost always more men than women.  However, it fits the profile for
economic inactivity in North Lanarkshire where there are a higher number of women
than men economically inactive.  In terms of age 59% of clients were over 30 years of
age and lastly, a higher number than usual had ongoing health conditions and caring
responsibilities at registration and 50% of clients had either no or lower secondary
school level qualifications. 
2.3 The tables above show a mixed picture in that the numbers registered on the
programme were much lower than initially profiled, with a corresponding decrease in
expenditure; however, the conversion from registration to a job outcome and
sustainment in work were higher than projected for the group.  Delivery of this project
has provided a number of lessons that have been integrated into the design of the
UKSPF programme for 2025/26.  These key lessons are: 
- Engagement of economically inactive residents on to employability programmes
requires a sustained and long-term approach with significant investment of time and
therefore resources.
- Using peer mentors from the area that potential service users live in is one of the
keys to engaging residents.
- Employability support needs to be accompanied by health and welfare rights
support and advice. 
2.4 S35 North Lanarkshire’s Working 
North Lanarkshire’s Working provided a continuation of the Council’s long-standing
commitment to provide free and large-scale employability advice and support across
all communities.  While open to all unemployed and underemployed residents this is
targeted at those unemployed and underemployed residents who face additional
barriers to entering or progressing in the labour market.  Driving up the employment
rate in North Lanarkshire is a cornerstone of The Plan for North Lanarkshire and
ensuring employability support is available to all is recognised as a major contributor to
tackling poverty and local economic development.   
The programme was led and co-ordinated by the Council’s Employability team, within
the Education and Families service, which also provides the key function of engaging
employers onto the programme.  Routes to Work Ltd provided specialised case worker
support to unemployed residents as well as support with accessing vocational training
and the short-term costs associated with moving from benefits to employment such as
childcare and travel.  They also provided in-work support for up to 6 months for those
participants that required it.   
Table 3: S35 North Lanarkshire’s Working Funding
Apr 2023 – Mar 2025 Forecast Actual Variance
UKSPF £2,721,000 £2,721,000 0
NLC Match  £4,941,300 £2,689,232 -£2,252,068 (-45%)
Total Cost £7,662,300 £5,410,232 -£2,252,068 (-29%) 
Table 4: S35 North Lanarkshire’s Working Outcomes
Apr 2023 – Mar 2025 Target Actual Variance
Registered  3,400 3,530 130 (3.8%)
Job Outcomes  1550 (46%) 1172 (33%) -378 (-24%)
Sustained job 70% 75% 5% 
The profile of those registered and engaged on S35 North Lanarkshire’s Working was
that 65% came from the most deprived 20% SIMD areas of North Lanarkshire and 31%
were female with 69% men.   In terms of age the spread was from 16 to 67 with 53%
Page 97 of 128

Page 98

of clients under the age of 30 and 45% of clients had either no or lower secondary
school level qualifications on registration.  The main health barriers cited by participants
were related to their mental health. 
2.5 The tables above show that in terms of registering clients the programme was effective;
however, the conversion from registration to job outcome was lower than predicted,
while still supporting over one thousand unemployed residents into employment in local
businesses with a higher than forecast sustainment level.  There was a significant
decrease in the spend profile, especially from Council match fund, and this related
mainly to Council staff costs being supported from other sources of external funds such
as the Scottish Government No One Left Behind fund.  Delivery of this project has
provided a number of lessons that have been integrated into the design of the UKSPF
programme for 2025/26.  These key lessons are: 
- Engagement of unemployed residents on to North Lanarkshire wide programmes
using a combination of direct marketing to residents through social media,
promotion of the programme to key stakeholders such as DWP and through the
work of Routes to Work Ltd within communities is effective.  
- Other Council services such as Housing, Restorative Justice, Community Learning
and Development and the Tackling Poverty team are key partners for  employability
support in UKSPF.
- Employability support needs to be accompanied by mental health and welfare rights
support and advice. 
2.6 2025/26 UKSPF Targets and Funding 
As reported to the Enterprise and Fair Work Committee on 14 February 2025 the
allocation of UKSPF to North Lanarkshire has been reduced but comes with the benefit
of being less prescriptive than the terms operated from 2023-2025.  For employability
the allocation of £1,568,837 is 78% of that allocated in the year 2024/25 which was split
across two programmes delivered by the employability team and Routes to Work Ltd.
as outlined above and separately tackling economic inactivity and unemployment.   In
2025/26 there will be one SPF employability programme (North Lanarkshire’s Working)
delivered by Routes to Work Ltd.  which will offer an all-age service and will ensure
there is a continuity of employability support in every community in North Lanarkshire. 
This new single programme will continue to address the challenge of economic
inactivity and unemployment (with separate targets) with funding and targets as
outlined below. 
Table 5: S35 North Lanarkshire’s Working 2025/26 Funding 
Budget
UKSPF £1,568,837
NLC Match  £2,079,302
Total Cost £3,648,139 
Table 6: S35 North Lanarkshire’s Working 2025/26 Outcomes
Outcomes Economically
Inactive Unemployed Total
Registered  299 1056 1,355
Job Outcomes  120 528 648
Sustained job 70% 70% 70% 
This new programme is capitalising on the effective engagement and registration
strategy delivered by the previous S35 programme but is also maintaining the use of
peer mentors to support and engage residents who are economically inactive. 
Alongside this health and welfare rights support is also integrated.  In recent years
Page 98 of 128

Page 99

employability support has also been significantly bolstered by increased levels of
funding from the Scottish Government through its No One Left Behind funding and this
is targeted on specialist groups and parents.  These funding streams are segregated
and accounted for separately but are integrated and aligned in a manner that means
residents who are looking for support or engaged should not be aware of any difference
in funding sources; however, at times there may be marketing and engagement
campaigns that aim to broaden our range of clients and deepen penetration into under-
represented groups in the labour market.
3. Measures of success
3.1  Economically inactive, unemployed and underemployed residents of North Lanarkshire
are effectively supported by the UK Shared Prosperity Fund.     
4. Supporting documentation 
4.1 No Supporting Documents 
Alison Gordon
Chief Social Work Officer (Education, Families, Justice & Integration)
Page 99 of 128

Page 100

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
All costs associated with the UKSPF dictated by the financial parameters agreed at
the outset for the delivery of the Council’s UKSPF projects. Council resources to
match fund this activity are from NLC Match Funding allocated to employability
projects.  
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
Page 100 of 128

Page 101

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Managing and monitoring service performance supports the ongoing monitoring of
the service’s risk register. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
Within all Council employability programmes veterans are immediately eligible for
support alongside other priority groups. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
Page 101 of 128

Page 102

If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒ 
Page 102 of 128

Page 103

North Lanarkshire Council Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    LN/DB/PH Date 29/08/25 
City Deal Programme – Community Benefits Delivery Update 
From  Pamela Humphries, Chief Officer (Place)  
E-mail balfourd@northlan.gov.uk  Telephone
Dorothy Balfour,       
07583 669609 
1. Background 
1.1       In June 2021, the Glasgow City Region (GCR) Cabinet approved the replacement              
Regional Sustainable Procurement Strategy for the Region that would: 
• combine and build upon the successful collaboration achieved under the
previous, separate procurement and community benefit strategies
• improve social, environmental, and economic wellbeing
• consider developments in the wider policy landscape, such as Fair Work First,
Grow Local, Community Wealth Building, the circular economy, how public sector
procurement can contribute to carbon reduction and climate adaptation
• extend the collaborative approach to progressive procurement objectives beyond
the scope of the City Deal projects to include wider infrastructure investment; and
Executive Summary 
The purpose of this report is to provide the Committee with an update regarding community
benefits delivery related to the City Deal Programme over financial year 2024/25, with
highlights on community benefits to date.   
Recommendations
It is recommended that the Enterprise and Fair Work Committee: 
(1) Acknowledges the contents of the report regarding the delivery of community
benefits related to the North Lanarkshire City Deal Programme. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (5) Grow and improve the sustainability and diversity of North
Lanarkshire's economy
Programme of Work Transforming Places 
Item 8
Page 103 of 128

Page 104

• to broaden the reach of the strategy to include capital investment by wider
Regional economic partners and key anchor institutions. 
1.2       Strategic Objectives & Priorities 
Within the Strategy’s strategic objectives includes an action plan with key tasks,
reported quarterly and annually. The 5 objectives align to 7 key priorities of Priority
Groups*, Tackling Inequality, Community Wealth Building, Skills, Employment,
Business and Place / Environment. 
*Priority Groups were identified from the findings of the Tackling Child Poverty Delivery
Plan 2018-22 and through consultation with the Scottish Government, Glasgow City
Region City Deal Member Authorities, Supplier Development Programme and
Construction Industry Training Board (CITB).   
2. Report 
2.1  Collaborative Groups 
The GCR City Deal and the council have mechanisms in place to support the
implementation and delivery of community benefit outcomes within City Deal contracts
via support from the Groups identified below. 
• The Council’s Community Benefits Development Group
The Group comprises various internal and external stakeholders such as education,
early careers, virtual schools, Developing the Young Workforce, Community
Partnership Team, supported enterprise, the apprenticeship team, employability
services and Routes to Work, to allow collaboration, co-ordination and to maximise
opportunities. 
• GCR City Deal Procurement Support Group (PSG)
The role of this group is to translate the strategic objectives and priorities into action
and delivery by monitoring performance and undertaking reviews to develop and
update the Buyer’s Guide and to target key priorities. At the beginning of the year the
GCRCD Buyers guide was reviewed, updated and amended. The points were reviewed
and adjusted accordingly with new outcomes being added to be in line with any GCR
City Deal and member authority policy changes and updates.   
• The Council’s Community Benefits Hub Group 
This Group was established to facilitate an online wish list whereby community groups
can add requests for financial and / or non-financial support and suppliers can register
to fulfil contractual obligations. The Group meets weekly to review, approve and
allocate requests to the most appropriate service area suppliers during the soft launch
(see further detail in section 3.8).   
3. Measures of success 
3.1 The delivery of community benefits is a key performance indicator on City Deal
contracts. Progress on the delivery of community benefit outcomes is reported quarterly
to the Glasgow City Region City Deal Programme Management Office (GCRCD PMO),
as part of project status reporting by the City Deal and Regeneration Team and are
Page 104 of 128

Page 105

subsequently reported to the Glasgow City Region Cabinet in quarterly performance
reports. 
3.2 Over its lifetime the City Deal is set to create 29,000 new jobs across the Region, in
addition to 15,000 temporary jobs during the construction period and it will support
5,500 unemployed people back into work. 
The following outcomes will be reviewed as part of the procurement process for the
Council’s City Deal construction projects (i.e. Ravenscraig Access Infrastructure South
project – New dual carriageway from Ravenscraig to Motherwell) and for the East
Airdrie Link Road): -
• creation of opportunities for employment and jobs, where specific community
benefit outcomes are exclusively available to Priority Groups (e.g. Young
people (16-24 years); Women – assuming primary care role for children;
Disabled people; Black Minority Ethnic people; and People experiencing
poverty and deprivation) to provide meaningful local jobs for people to move in
to work or closer to the labour market. 
• The council works closely with our external partners, Developing Young
Workforce, to secure the most appropriate candidates for work experience
placements and work with our internal council teams to fulfil paid summer
placements. 
• Supply Chain events outcomes will be considered to allow the Tier 1 contractors
to support local SMEs and encourage them to bid for subcontracting packages
resulting from these large construction projects awards. 
3.3 The community benefits achieved to date from the City Deal inception totals 166
benefits, up by 21 outcomes since last year that include:
• New jobs (priority and non-priority groups)
• Apprenticeships
• Work Experience placements school and non-school students
• Careers Events
• Workplace visits
• Supply chain briefings
• Taster sessions 
• Community engagement (financial and non-financial) 
Note the increase is less than anticipated due to deferral of the Ravenscraig Access
Infrastructure (North) project from the City Deal programme and revised approach to
delivery of the Ravenscraig Access Infrastructure (South) project. 
3.4 The approach followed and the benefits that have been achieved since the creation of
the council’s Community Benefits Development Group have allowed the project team
to target: 
• Specific community groups
• Identify suitable schools and students
• Identify the most appropriate training requirements 
This approach benefits the local community by ensuring that residents, particularly
students and community groups, receive the assistance and placements they need. It
enables individuals and communities to flourish, targets outcomes and enhances
economic growth regionally and locally in the North Lanarkshire area.  It also improves
Page 105 of 128

Page 106

supplier efficiency, allowing them to meet their contractual obligations more effectively
through input and assistance from various internal and external stakeholders to the
council. 
3.5 In financial year 2024/25, spanning April 24 to March 25, we have fulfilled a further 7
outcomes that include: 
• 1 new employee full time job from a priority group
• 5 work experience placement – School 
• 1 careers event 
Note: the number above is from a point in time, there will be other outcomes that will
have been fulfilled yet to be uploaded and evidenced on our community benefits
platform, Cenefits. 
The East Airdrie Link Road 
3.6 The Preliminary Design, DMRB Stage 3 Assessment and Statutory Procedures
consultancy contract has fulfilled 8 out of the 16 outcomes with a further 12 months  
to be able to fulfil the remaining outcomes. The tables below provide detail of the 
outcomes achieved and those in progress. 
3.7 Recruitment & Employment 
Outcome Quantity Qty
Complete
Additional Information 
New employee full time,
minimum 26 weeks (from priority
group) 
1 Ongoing Graduate Environmental
Consultant started 2/9/24
New entrant graduate full time,
minimum of 1 year from a
priority group
1 0 Further discussion to
take place 
Total 2 1 
3.8 Skills & Training 
Outcome Quantity Qty
Complete 
Additional Information 
Work experience
placements – Foundation
Apprenticeships (1 week)
4 2 Substituted for school
placements through liaison with
DYW partners at St Ambrose
High School w/c 12/5/25 
2 further placements in
discussion as part of a joint
event
Work experience
placements non-school 
4 4 Substituted for school
placements through liaison with
DYW partners at St Ambrose
High School w/c 3/3/25
Work experience
summer placements -
nonpaid 
2 0 1 person due to start placement
on 7/7/25 for a period between 8
– 12 weeks interpreting the
Page 106 of 128

Page 107

results of the ground
investigations contract 
Primary school
engagement (mini
careers event for P6/P7)
1 0 A joint event is planned with St
Ambrose high school and St
Kevins primary school in
September / October 25 with
further discussion to take place
with Additional Support Needs
(ASN) students at Buchanan
high school
Careers event – (virtual
Teams Session) 
1 1 Replaced by face-to-face
careers event, at Airdrie
Academy on 13/6/24
Total 12 7 
3.9 Community Engagement 
Outcome Quantity Qty
Complete
Additional Information 
Non-Financial support for a
community project (minimum 7
hours)
2 0 Requests to be chosen
from the community
benefits hub
Total 2 0 
Ravenscraig Access Infrastructure (RAI) 
3.10 RAI - North
The Multi-disciplinary Project Services for the RAI North contract was removed from
the City Deal Programme, resulting in a reduction in the contract term of 7 months and
a reduction of £842,000.  Negotiations are now taking place regarding the final number
of outcomes to be fulfilled. In addition to this contract, there were small subcontracts
that will not proceed which will also impact on previously projected outcomes.   
3.11 RAI - South
As previously reported to committee a revised procurement strategy has been adopted
to allow for a phased delivery approach and procured with individual community benefit
outcomes attributed to each contract as follows: - 
Motherwell Demolition and Clearance Services 
Outcome Quantity Qty
Complete
Additional Information 
Work experience placements
non-school
1 0 Due to short turnaround
and timing of the works
the outcomes are to be
substituted for an
equivalent value and a
request chosen from the
community benefits hub.
Careers Event  1 0
Total 2 0 
Page 107 of 128

Page 108

Demolition, Structures and Engineering Contract Support Services
Outcome Quantity Qty
Complete
Additional Information 
Work experience placements
non-school
1 1 Through liaison with DYW
partners a student from
Dalziel High School w/c
15/1/25
Total 1 1 
Value Engineering Review
Outcome Quantity Qty
Complete
Additional Information 
Work experience
placements school
1 1 Through liaison with DYW
partners at St Ambrose High
School w/c 12/5/25
Primary school
engagement (mini
careers event for P6/P7)
1 0 A joint event is planned with St
Ambrose high school and St
Kevins primary school in
September / October 25 with
further discussion to take place
with (ASN) students at
Buchanan high school.
Financial support for a
community project
(£1,000)
1 0 Request to be chosen from the
community benefits hub
Total 3 1 
Community Wealth Building (CWB) 
3.12 Community Wealth Building is recognised as a key enabler of the Glasgow City Region
Economic Strategy. By using the assets, power and wealth of anchor organisations
across the Region to redress inequality, the approach will support the Region to be
more productive, and more sustainable. 
3.13 A key component of the delivery approach of the Strategy will be to use a CWB
approach to maximise the local impacts of investment in programmes and projects
across the Region. Work has already begun on a regional approach across all 5 Pillars
including the establishment of an Anchor Network and the approval of a new
Sustainable Procurement and Community Benefit Strategy which included a
commitment to introduce a Regional Community Wish List scheme to meet the needs
of local communities via suppliers that is linked to Pillar 1 - Spending. 
Community Benefits Hub (Wish List) 
3.14 In consultation with the 8 Member Authorities, GCRCD PMO procured a web developer
to create an online platform to allow community groups to post requests to identify
tangible benefits where contracted suppliers to the council can fulfil their financial and
non-financial contractual community benefit outcomes.   
The creation of this online platform aims to: 
Page 108 of 128

Page 109

• Create efficiencies for internal staff who are carrying out these tasks on offline
spreadsheets.
• Have a centralised approach that will link with the 9 Community Boards and the
council’s Community Partnership Team which will assist in ensuring benefits
are distributed fairly and equitably across the area.
• Expand the range and number of Community Groups that can participate and
gain economic / social /environmental impacts and benefits. 
The platform will:
• Automate the collection of evidence, feedback and scores for the community
benefits delivered in their contracts saving you time and money.
• Generate reports to help realise benefits and celebrate their successes. 
• Measures performance against project targets and KPIs in real time 
Four of the eight local authorities have now signed up to the hub, Glasgow City Council,
East Renfrewshire Council, Inverclyde Council and North Lanarkshire Council for
requests to be fulfilled for City Deal projects and business-as-usual contracts. 
North Lanarkshire Council took a decision to go live at the outset but to proceed on a
soft launch basis to understand the impact to the council in terms of resource, to seek
approvals from the relevant stakeholders i.e. Enterprise Architecture Governance
Group (EAGG) and ensure all necessary data and information security paperwork is
completed i.e. Data Protection Impact Assessment (DPIA). 
3.15 Process
This process was being carried out offline via emails and phone calls, however having
a platform now allows the council to reach more community groups and thus increasing
the number of community groups requests. 
The Community Partnership Team qualify and approve all constituted and non-
constituted community group registrations and have carried out training with each team
member who work in the 9 community board areas and will feed into the boards
regarding updating and approvals for groups. 
Each group is allowed to enter up to 3 requests at any one time and the maximum cap
on each request is £2,000. 
The council service areas will approve the suppliers relating to their contracts and liaise
with them once the supplier has matched with a request to completion. Once the
request has been delivered, it is the responsibility of the community group and supplier
to upload evidence. 
A community benefits page is being created to showcase all the positive work that our
suppliers are doing in the local community. 
3.16 As part of a 2nd phase and the CWB approach, Anchor Organisations such as local
universities and housing associations, will be allowed to invite their own contracted
suppliers to use the system which will support and enable them to fulfil local authorities’
community benefits requests.   
3.17 Progress to date: 
As indicated above the Council took a decision to carry out a soft launch of the system
and has been running since September 2025, see progress below: - 
Page 109 of 128

Page 110

Type Quantity
Approved Community Groups  37
Approved businesses  22
Approved Requests / wishes  * 20
Matched requests / wishes in progress  3
Matches Delivered 10
*Note of the 20 approved requests, 75% are currently in discussion with businesses 
4. Supporting documentation 
4.1  No Supporting Documents. 
Pamela Humphries
Chief Officer (Place)
Page 110 of 128

Page 111

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Regional Sustainable Procurement Strategy complies with both duties. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☒ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☒
Page 111 of 128

Page 112

If Yes, please provide a brief summary of the impact? 
The Community Benefits Hub is an online platform which has been procured and
funded by GCRCD where North Lanarkshire Community Groups can add requests
to be fulfilled via suppliers as part of their contractual commitments. 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
It was proposed and approved by the EAGG that we will continue using a soft
launch until such times as we have a fully documented process in place with
adequate resource across the council to facilitate this platform. 
Yes ☒ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 112 of 128

Page 113

North Lanarkshire Council 
Report 
Enterprise and Fair Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    PH/YW Date 29/08/25 
Lanarkshire Business Gateway – Performance Report 
From  Pamela Humphries, Chief Officer (Place)  
E-mail weiry@northlan.gov.uk Telephone Yvonne Weir
07508 001238 
Executive Summary 
Business Gateway is a national service which is delivered by individual local authorities to
provide free, impartial advice and support to pre-start, new start and existing businesses. 
In Lanarkshire the service was delivered through a series of outsourced contracts. The
service was insourced with effect from 1st March 2024 with North Lanarkshire Council
delivering the service on behalf of both Councils. 
This report provides an overview of the activities and performance achieved during the first
year of an in-house delivery model of the Business Gateway Lanarkshire service. 
Recommendations 
It is recommended that the Enterprise and Fair Work Committee: 
(1) Acknowledge the performance of the service from 1 April 2024 to 31 March 2025
(2) Endorse the revised targets for service delivery in 2025/2026 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (5) Grow and improve the sustainability and diversity of North
Lanarkshire's economy
Programme of Work Brighter Futures
Item 9
Page 113 of 128

Page 114

1. Background 
1.1 Business Gateway is a nationally branded service which is delivered by individual Local
Authorities to provide free, impartial advice and support to pre-start, new start and
existing businesses.
1.2 Business Gateway has the following core service objectives: 
• Support more people with their ambitions to start a business.
• Support more businesses to survive and achieve their growth ambitions.
• Support more people with their aspirations for high business growth.
• Support more people from underrepresented groups to access mainstream
business support. 
1.3 Underpinning the service objectives there is a commitment to providing support across
a number of themes such as Carbon Reduction, Fair Work, Innovation,
Internationalisation, Digital Upskilling, Community Wealth Building, and Job Creation.
In addition, Local Authorities have the flexibility to tailor services to address specific
local needs and priorities. 
1.4 North Lanarkshire Council has managed the delivery of Business Gateway Services
on behalf of both North and South Lanarkshire Councils since 1 April 2008. Between
April 2008 and February 2024, the service was delivered through a series of outsourced
contracts.  Following an options appraisal, the service was insourced with effect from
1st March 2024 with North Lanarkshire Council delivering the service on behalf of both
Councils 
1.5 Coinciding with the move to in-house delivery, Business Gateway National
implemented a new Service Specification which introduced new client classifications to
support customer engagement (commencing June 2024).  This was to allow an adviser
to provide an intense level of support to a customer when required - determined by
client needs, ambitions and the potential for economic impact. The expectation being
that businesses offering higher growth potential would typically receive more support. 
1.6 These two major changes meant that 2024/25 was expected to be a year of transition
as staff faced the various challenges of integrating with a new employer, in a new
environment to provide a service which had a new delivery focus and service
specification. 
1.7 In addition to the national objectives, the following local priorities and objectives were
also agreed for 2024/25 to align to the plans for both North and South Lanarkshire
Councils: 
• Increase the reach of Lanarkshire Business Gateway across all communities
including a renewed focus and take-up of services from residents from rural
communities and priority SIMD areas 
• Increase take-up of Lanarkshire Business Gateway services from under-
represented groups including long-term unemployed, economically inactive
residents, carers, young people, BAME, disabled people, restorative
justice/offenders 
• Increase focus and take-up of Lanarkshire Business Gateway services from Social
Enterprises, employee-owned businesses and co-operatives 
• Inspire and increase engagement and take-up of services by young people
focussing on enterprise pathways in schools, college (New College
Lanarkshire/South Lanarkshire College), UWS, youth groups 
Page 114 of 128

Page 115

• Working alongside sectoral plans provide Business Gateway services to key
sectors including construction, food and drink, creative industries, energy sector,
manufacturing/engineering services, tourism, transport & logistics 
• Delivery of support to town centre businesses to support North Lanarkshire/South
Lanarkshire town centre action plans 
• Increase engagement with non-engaged businesses 
• Businesses who require additional support to survive 
2. Report 
2.1 This report provides an update on the activity and performance of Business Gateway
during 2024/25 and sets out the targets that the service is working towards in 2025/26. 
Enquiries 
2.2 Clients typically access the Business Gateway service through making an initial enquiry
via multiple channels.  Business Gateway Lanarkshire continues to receive
approximately 3,000 enquiries per year, of which 2,000 relate to Pre-Start/New Start
business enquiries with the balance of 1,000 enquiries being from established
businesses.   
2.3 2024/25 Full Year Performance  
Service Q1 Q2 Q3 Q4 Total Target % to Target NLC SLC          
Total Enquiries 732 734 654 799 2919 3000 97.3% 51.6% 45.6%
Pre-Start  509 457 472 562 2000 2000 100% 54.7% 45.3%
Existing Business 225 275 182 237 919 1000 91.9% 45.7% 46.2% 
2.4 Enquiry levels overall for the year 2024/25 increased by 115 on the previous year;
driven by the prestart/new business segment.  The additional enquiries received in
North Lanarkshire mainly relate to the Prestart grant offering by North Lanarkshire
Council, those using the Hive in Airdrie (female co-working space) and from the team
working with Minority Ethnic Background customers.  The proportion of pre-start/new
business enquiries to existing business is in line with the expected norm of a 2/3 to 1/3
split.   
Business Start Up Service 
2.5 Prior to being allocated a dedicated business adviser, a pre-start customer will be
accompanied through an online tool called the “Planning to Start” review which
provides an insight into customer knowledge, requirements and understanding of their
business idea.  In the year reported, 1157 reviews were handled (628 North & 529
South). Of this figure over 50% were new to the service or had a new business idea.
This tool enables the Business Gateway Adviser to have a meaningful ‘first’
engagement with the customer and to personalise an action plan to support their
journey.  It also allows the adviser to identify those who are highly engaged, have the
potential to create employment, take on commercial premises and/or achieve VAT
threshold within 1 year of trading.  These customers can be classified as Pre-start
Plus, enabling more intensive support to be delivered on a one-to-one basis.
Page 115 of 128

Page 116

Once a pre-start client commences trading, the business is classified as either a New
Business or, if it has growth potential, a as New Business Plus, with ongoing support
being provided during the first 12 months of trading. 
2.6 2024/25 Full Year Performance 
Service Q1 Q2 Q3 Q4 Total Target % to Target NLC SLC          
New Business Starts 84 172 133 164 553 750 73.7% 40.5% 33.2%
New Business Plus Starts 9 31 19 58 117 200 58.5% 36.5% 22% 
2.7 The New Business start performance was lower than target and the previous year
with a range of contributing factors noted below: 
• Impact of transitional period while the service transitioned from the previous
contract to in-house delivery model, including setting up new systems and
processes, alongside impact of introduction of a new service specification by
Business Gateway nationally. 
• External factors: Lower levels of new business bank accounts set up across
Lanarkshire from Oct 2024 – March 2025 (50-70 less) and with unemployment at
low levels, job security is proving a better option for some customers who are
accepting job offers rather than becoming self-employed.
• Resources – there was a reduction in resources for periods in the year due to time
taken to fill a vacancy and sickness absence. 
2.8 It is important to note, that of all the enquiries coming into the service that fit the profile
of a prestart customer; the team were only able to convert 28% to starting a business
(1:4).  This is in line with the Scottish Business Gateway National conversion rate. A
number of reasons have been cited on this including; customers were exploring self-
employment and have no intention of starting, others have full time employment and
do not wish to take the risk or feel that the costs are too high.  Whilst others who may
indeed start with our help, cannot be categorised as a valid start claim due to lack of
customer engagement and evidence (as per the Business Gateway national rules).   
2.9 New Business Starts Plus targets were increased by 50% on the previous year as it
was expected that the advisers would have more time to spend supporting these
customers. Whilst performance did not meet target, 36 more businesses were identified
than the year before.  However, a key change for this category requirement was that
the customer was to be actively engaged and willing to work with the adviser to achieve
their growth aspirations. This category remains a challenge with customers accessing
initial support and advice but then disengaging due to time constraints as they start
their business. 
2.10 While it is recognised that the external environment remains challenging for new
businesses, the service is taking a number of steps to increase business startups,
including an increased focus on identifying potential clients who would benefit from
Business Gateway services, including target marketing activity and programming of
monthly Business Start Up Bootcamp events. 
Page 116 of 128

Page 117

Existing Business Services 
2.11 Businesses which have been trading for more than 12 months are regarded as an
existing business and are classified in one of the following three ways: 
• Business Gateway Growth – A business with plans to increase turnover by a
minimum of £200,000 within 3 years. 
• Local Priority – A business that needs assistance to survive or achieve modest
growth and which satisfies local priority criteria – set by North and South
Lanarkshire Councils.
• Business Base – Any business that does not satisfy the above criteria but can still
access one to one adviser support 
2.12 2024/25 Performance  
Service Q1 Q2 Q3 Q4 Total Target % to Target NLC SLC          
Business Gateway
Growth
2 15 40 60 117 150 78% 41.2% 36.8%
Local Priority 3 18 19 37 77 150 51.3% 27.3%  24%
Business Base 169 173 121 206 669 700 95.6% 46.6% 49% 
2.13 As with Business startups, it is recognised that this is a demand led service and
economic conditions remain challenging for businesses.  The Business Growth team
was had capacity issues due to staff absence and a vacancy.  Going forward there is
an increased focus on identifying potential clients through use of the key sector plans
and Expert help programme to engage with those business owners that have most
growth potential. 
Quality Assurance
2.14 The quality of the Business Gateway service delivery in each Local Authority area is
monitored by Business Gateway nationally via an independent research organisation
which surveys clients that have interacted with the service. Seeking feedback in respect
of the level of satisfaction related to six criteria, as follows: 
• General satisfaction with the BG service.
• Were expectations met/exceeded.
• Was the service provided of benefit to the business.
• Would they recommend the BG service to others.
• Would they continue using the BG service.
• Satisfaction with staff.  
Based on the client feedback*, a score is generated based on the number of very
satisfied/satisfied responses received and compared against the national target of an
80% positive response in each measured area. 
Page 117 of 128

Page 118

2.15 Year to Date Performance – Target 80% for all criteria 
Service Criteria 2024-25 
NLC SLC
Satisfaction with BG 83% 81%
Expectations Met/Exceeded 81% 77%
Beneficial to Business 81% 75%
Likelihood to Recommend 84% 82%
Likelihood to Keep Using 86% 85%
Satisfaction with Staff 93% 89%
*Data set is less than 10% of customers using the service 
2.16 Both North and South Lanarkshire based customers have secured strong and
consistent performance across all service areas, with high satisfaction levels, growing
client loyalty, and excellent staff interactions. Notably, North Lanarkshire area saw
steady improvements in meeting expectations and satisfaction with staff achieved
100% in Q3.  These results reflect a clear commitment to the delivery of valuable,
reliable, and people-focused business support service. 
Workshops/Events
2.17 The provision of on-line webinars is a major feature of the support that is delivered by
Business Gateway at a national level. These webinars address a wide range of
business topics with quality content which is professionally delivered. As such, the
decision was taken that we should not duplicate what was on offer nationally but seek
to complement it by providing different topics and running a number of in person events
to give clients the opportunity to network. 
2.18 Workshops and attendance is noted below:  
Service Total NLC SLC    
Local Workshops 21  
Booked 378  
Attended 218 107 111    
National Workshops  435  
Booked 3335  
Attended 1686 899 787 
2.19 The priority was to fully utilise the nationally available webinar programme which has
seen 1686 Lanarkshire clients attend a range of 435 workshops with almost a 50/50
split of those based in North and South Lanarkshire areas respectively attending. 
2.20 The local workshop provision includes a ‘bootcamp’ format which have proved popular
and resulted in waiting lists for many of the dates advertised.  The rate of attendance
continues to be high, with very positive feedback received from participants.  The
bootcamps run monthly and change location to different communities to reach a wider
customer base.  Locations covered include:
Page 118 of 128

Page 119

• North Lanarkshire; Motherwell, Wishaw, Newmains, Coatbridge and
Cumbernauld.   
• South Lanarkshire; Cambuslang, Rutherglen, East Kilbride, Hamilton &
Douglas 
2.21 The service is also working with partner organisations such as Routes to Work and the
council’s Supported Enterprise Service, to develop new pathways to self-employment
and help reduce barriers for under-represented groups and those who are economically
inactive.   
Community Engagement 
2.22 The Business Gateway Lanarkshire team supported over 120 events across
Lanarkshire in 2024/25.  This allowed the profile of the service to be raised and
networking with potential customers.  Events include monthly FSB and Lanarkshire Hub
networking;  Redundancy meetings with PACE;  Educational events in Schools &
Colleges – Dragons Lair (North Lanarkshire) and Shark Reef (South Lanarkshire); mini
workshops for those studying subjects that lean towards self-employment, e.g. hair &
beauty and photography;  Police College retirement sessions; Meet the buyer through
Supplier Development Programme and local authority events linked to the Real Living
wage, Employee Charter and Minority Ethnic engagement.   
Marketing
2.23 The 2024/25 year was a period of transition for Business Gateway Lanarkshire, with
our marketing activity evolving to keep pace with operational changes and shifting
service priorities. Despite challenges, we continued to raise awareness of our support,
connect with communities, and lay the foundations for a more strategic approach going
forward in 2025/2026. 
2.24 Looking ahead, the marketing and PR strategy will be refined to align more closely with
key sectors and service objectives. Focus will be placed on increasing engagement
among young people and ethnic minority communities, supported by partnership
working with local colleges, youth forums, and employability services. Collaborative
efforts with organisations such as Routes to Work and supported employability
programmes will continue to reduce barriers to self-employment for underrepresented
groups. 
3. Measures of Success
3.1 One of the main reasons for bringing the Business Gateway service in-house was to
develop closer links with other council services that provide business facing services. 
Continued focus will remain to create a team champion for each of these services in
both councils who will be responsible for fostering and developing links with the BG
service and local authority. Some of the key services include Environmental Health,
Trading Standards, Non-Domestic Rates, Planning, Routes to Work (North and South),
Licensing and Employability Services. 
3.2  As the focus for the new Business Gateway Service is for advisers to spend more time
working with clients that have growth potential and that the Performance Measurement
Framework is substantially different from what has gone before, a revised set of
performance targets is proposed for 2025/26. These have been developed to reflect
Page 119 of 128

Page 120

the key learnings from the first year of service delivery and the requirement of both local
authorities. They as follows: 
• Pre-Start Clients Supported - 2000 – retained at current levels
• New Business Starts -  650 – reduced to reflect the current market conditions and
to enable more adviser time with individual clients.
• New Business+ Starts – a range of 65 to 100 per annum – reduced to reflect current
market conditions
• Existing businesses supported – 1000, of which:
o Local Priority –100 clients supported – reduced to reflect current market
conditions
o Business Gateway Growth – 150 clients supported – target retained
o Business Base – 750 clients supported with 121 advisory services –
increased to reflect market demand 
3.3 The quality of service delivery will continue to be measured by an independent third
party. The target will continue at 80% across the 4 key quality areas: Overall
Satisfaction; Expectations Met; Business Benefits and Recommend Service.   
4. Supporting documentation 
4.1       Appendix 1 2024/25 Business Gateway Infographic 
Pamela Humphries
Chief Officer (Place) 
Page 120 of 128

Page 121

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The service is open to all clients who are looking to receive a service to assist them
to set-up or grow a business. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Page 121 of 128

Page 122

Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
A risk register for the service is in place and monitored in line with council
guidelines. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 122 of 128

Page 123

Appendix 1 
Page 123 of 128

Page 124

Page 124 of 128

Page 125

North Lanarkshire Council
Report
Enterprise and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    JMcK/CPT Date 29/08/25 
Contracts awarded below Committee approval threshold 
From  James McKinstry - Chief Officer (Assets and Procurement)  
E-mail McKinstryJ@northlan.gov.uk  Telephone 07939 281102 
Executive Summary
In accordance with the Council’s General Contract Standing Orders (“GCSOs”), GCSO
21.10 requires a summary report be presented to members with details of contracts
awarded since last committee, specifically for the spend range: 
• over £50,000 but below £500,000 for supplies or services; and,
• over £500,000 but below £2,000,000 for works. 
Recommendations
It is recommended that the Enterprise and Fair Work Committee: 
(1) Acknowledge the contract awards made since last committee reporting cycle.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Item 10
Page 125 of 128

Page 126

1. Background 
1.1 The Local Government (Scotland) Act 1973 section 81 requires local authorities to
“…make standing orders with respect to the making by them or on their behalf of
contracts for the supply of goods or materials or for the execution of works.”. 
1.2 The Council’s General Contract Standing Orders (“GCSOs”) set out the council’s
specific procurement procedures and responsibilities at all spend levels, and include
the reporting requirements of procurement activity, including contracts awards, to
committee for either approval or acknowledgement. 
2. Report 
2.1 In accordance with GCSO 21.10, this report summarises the contract awards since last
committee, specifically for the spend range: 
• over £50,000 but below £500,000 for supplies or services; and,
• over £500,000 but below £2,000,000 for works. 
2.2 If you require further information regards the contract awards reported, please refer to
the lead service area / Chief Officer detailed in the appendix. 
3. Measures of success 
3.1 All requirements contracted contribute to either the council’s programme of work and/or
fulfil a statutory requirement. 
3.2 All contract awards secure best value for the council in accordance with their evaluation
criteria. 
3.3 All necessary diligence has been undertaken in the evaluation and appointment of
contractors. 
3.4 All contract awards are logged in the council’s contract register. 
4. Supporting documentation 
4.1 Appendix 1 Summary of contracts awarded. 
James McKinstry
Chief Officer (Assets and Procurement) 
5. Impacts 
5.1 Impacts considered as part of the contract award procedures are recorded in the
individual contract award reports held by the lead service area. 
Page 126 of 128

Page 127

Summary of Contracts Awarded                       Appendix 1 
Contract Ref NLC-CPT-24-073          
Title Dry Riser Inspection Service and Maintenance        
Classification Services
Chief Officer, Service Area  Alison Gordon, Chief Officer (Children, Families, Justice and Integrated Practices)      
Competition Governance by Value Lower Threshold Regulated Procurement, procured in accordance with The Procurement Reform
(Scotland) Act 2014 AND The Procurement (Scotland) Regulations 2016
Procurement Route Single Stage Procedure
Expressions of Interest 13
No. of Bids Received 4
Award Criteria Most Economically Advantageous Tender
Evaluation Scores - Successful 80.40%
Evaluation Scores – Unsuccessful 41.63% - 58.18% 
Award
Details
Value £100,000         
Contract Duration 36 months with option to extend for up to 24 months (36 + 12 + 12)
Contractor Name M&S Fire Protection (GLW) Limited        
Contractor Size Small
Contractor Location Glasgow
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? Yes      
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer Scotland
Duty ☐
HR Policy Impact ☐ Data Protection Impact ☐ Environment / Carbon
Impact ☒
Risk Impact ☐ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☐ Legal Impact ☐ Technology / Digital
Impact ☐
Communications Impact
☐
Armed Forces Covenant
Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer        
Page 127 of 128

Page 128

Contract Ref NLC-SLP-24-115 
Title East Airdrie Link Road DMRB Stage 3 Ground Investigations     
Classification Works
Chief Officer, Service Area Pamela Humphries, Chief Officer (Place)      
Competition Governance by Value The Dynamic Purchasing System (“DPS”) terms & conditions, with adherence to the council’s GCSO 13
on 3rd party frameworks/DPS
Procurement Route Mini Competition using a Third Party DPS
No. of DPS Contractors 8
No. of Bids Received 3
Award Criteria Most Economically Advantageous Tender
Evaluation Scores – Successful 91.00%
Evaluation Scores – Unsuccessful 27.00%-83.62%
Comments This has been procured via a mini competition from the Scottish Government Civil Engineering DPS
Scotland – projects up to £5M, Lot 4: Geotechnical Services and Related Works     
Award
Details
Value £1,226,926
Contract Duration 6 months
Contractor Name Soil Engineering Geoservices Limited
Contractor Size Small
Contractor Location West Yorkshire
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? No      
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer Scotland
Duty ☒
HR Policy Impact ☐ Data Protection Impact ☐ Environment / Carbon
Impact ☒
Risk Impact ☒ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☒ Technology / Digital
Impact ☐
Communications Impact
☒
Armed Forces Covenant
Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer       
Page 128 of 128