Page 1

Our Ref:
Your Ref:
Contact:
Tel:
Fax:
E-Mail:
Date:
Clare Louise McDonald
01698302190
mcdonaldcl@northlan.gov.uk
12 May 2023    
Members of the
Education, Children and Families Committee
Chief Executive’s Office
Archie Aitken
Chief Officer (Legal and Democratic)
Civic Centre, Windmillhill Street
Motherwell ML1 1AB
DX 571701, Motherwell 2
www.northlanarkshire.gov.uk   
Notice is given that a Meeting of the EDUCATION, CHILDREN AND FAMILIES COMMITTEE is to
be held within the Council Chamber, Civic Centre, Motherwell  on Tuesday, 23 May 2023 at 2:00 pm
which you are requested to attend.
The agenda of business is attached.
Chief Officer (Legal and Democratic)
Members :    Councillors: D Ashraf, A Ballinger, C Barclay, M Boyd, H Brannan-McVey, A Bustard,
A Campbell, T Carragher, C Costello, M Coyle, S Coyle, G Currie, A Duffy-Lawson,
H Dunbar, F Fotheringham, M Hughes, D Johnston, T Johnston, J Jones, P Kelly,
J Keltie, A Khan, K Larson, H Loughran, A Magowan, A Masterton, B McCluskey,
B McCulloch, F McKay, R McKendrick, C McManus, M McPake, A McVey, L Mitchell,
K Stevenson, A Stubbs, J Toner, N Wilson, G Woods and M Clarkson, G McCormack,
M McCrossan, G Paterson and I Scott.
Page 1 of 167

Page 2

Page 2 of 167

Page 3

AGENDA
(1) Declarations of Interest in terms of the Ethical Standards in Public Life Etc. (Scotland) Act
2000
OPERATIONAL
(2) 1140 Hours Early Learning and Childcare Expansion Programme Update (page 5 - 22)
Submit report by the Chief Officer (Education - North) providing an updated position on the
1140 Hours Early Learning and Childcare (ELC) expansion programme (copy herewith)
(3) Health and Wellbeing (page 23 - 44)
Submit report by the Chief Officer (Education - North) providing an update on the progress of
the implementation and development of the Roadmap to Recovery Mental Health and
Wellbeing Plan across the Education and Families (copy herewith)
(4) School Holiday Consultation (page 45 - 50)
Submit report by the Chief Officer (Education - North) providing an update on a consultation
on proposals to reduce the summer break by one week and adjust other term dates to
accommodate (copy herewith)
(5) Developing Gaelic Language within North Lanarkshire - Leasachadh Dealbhadh Gaidhlig ann
an Comhairle Shiorrachd Lannraig a Tuath (page 51 - 66)
Submit report by the Chief Officer (Education - North) outlining plans for the expansion of
Gaelic Education within North Lanarkshire (copy herewith)
(6) Progress Report on Future Fridays (page 67 - 78)
Submit report by the Chief Officer (Education - South) providing an update on the Future
Fridays programme as it reaches the end of its second school session (copy herewith)
(7) Embedding the United Nations Convention on the Rights of the Child (UNCRC) (page 79 - 88)
Submit report by the Chief Social Work Officer (Education and Families, Justice and
Integrated Practice) providing an update on ongoing activity and developments to promote
UNCRC (copy herewith)
(8) Town and Community Hub Delivery Programme - Update on Progress of the Hub
Development and Delivery Programme (page 89 - 112)
Submit report by the Chief Officer (Asset and Procurement) providing an update on the Town
and Community Hub Delivery Programme (copy herewith)
(9) Community Asset Transfer Request - Cumbernauld Cottage Trust (page 113 - 134)
Submit report by the Chief Officer (Strategic Communication and Engagement) informing of
the outcome of the assessment process following the request for a Community Asset Transfer
(CAT) relating to the former Cumbernauld Theatre (copy herewith)
Page 3 of 167

Page 4

2
PERFORMANCE
(10) Strategic Performance Framework - latest Performance Results for Childrens Social Work
(page 135 - 146)
Submit report by the Chief Officer Social Work Officer (Children, Families, Justice and
Integrated Practice) providing an update of the latest results for a suite of specific
performance indicators, that can be compared nationally (copy herewith)
FINANCIAL
(11) Revenue Budget Monitoring Report (page 147 - 160)
Submit report by the Deputy Chief Executive providing a summary of the financial
performance of the Education, Children and Families Service for the period 1 April 2022 to 3
March 2023 (Period 12) and the projected outturn position as at 31 March 2023 (copy
herewith)
CONTRACTS
(12) Contracts Awarded Below Committee Approval Threshold (page 161 - 167)
Submit report by the Chief Officer (Assets and Procurement) advising of the contracts
awarded between 1 January and 31 March 2023, with a value below the financial threshold
requiring Committee approval (copy herewith)
Page 4 of 167

Page 5

North Lanarkshire Council
Report
Education Children & Families Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  GMcL/JOH Date 23/05/23 
1140 Early Learning & Childcare Expansion Programme Update 
From  Gerard McLaughlin, Chief Officer (Education - North) 
E-mail mclaughling@northlan.gov.uk Telephone 01236 812269 
Executive Summary 
The 1140 Hours Expansion programme for Early Learning and Childcare (ELC) was a
national programme developed in a unique way, in response to specific local
circumstances. 
This report provides Committee with an updated position on the 1140 hours Early Learning
and Childcare (ELC) expansion programme within North Lanarkshire. It reinforces previous
reports which have already been approved by Committee and is based on significant
consultation with stakeholders. In addition, it supports The Plan for North Lanarkshire. 
The report focuses on the capital programme, workforce, and progress in relation to quality.
In addition, it provides a financial update as of period 12.  
Recommendations 
It is recommended that the Education, Children and Families Committee:    
(1) Endorse the 1140 project update.
(2) Endorse the position regarding Heathery Park Family Learning Centre.
(3) Endorse the current position in relation to the budget setting progress and the
impact on the ELC.
(4) Endorse the Negotiated Tender Process for the delivery of ELC.
(5) Endorse the position in regards to the review of the Sustanable Rate for Partner
Providers from August 2023.
(6) Endorse the recommendation to change the start date for 3 year-olds to the
beginning of the term after the child’s 3rd birthday. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (7) Enhance collaborative working to maximise support and ensure
all our children and young people are included, supported, and safe
AGENDA ITEM 2
Page 5 of 167

Page 6

1. Background 
1.1 North Lanarkshire Council (NLC) achieved full delivery of 1140 hours by 30 September
2020, prior to it being legislative from August 2021. 
1.2 The ELC team continues to progress with plans to ensure children and families fully
access the benefits of 1140 hours. 
2. Report 
2.1 Infrastructure Projects 
2.1.1   Table 1 provides an update regarding the outstanding infrastructure projects. 
Table 1
Site Start Date Completion Date
Extensions / Adaptations
Craigneuk FLC February 2023 May 2023
Heatherypark FLC April 2022 TBC 
2.1.2 The outdoor adaptations and roof works at Craigneuk Family Learning Centre have
now been completed however, the roof works have impacted on the internal ceiling,
which now requires to be repaired. In addition, there are further delays with the supply
of materials. It is now anticipated that all works will be complete by mid-May. 
2.1.3 Work continues within Heatherypark FLC and is being closely monitored by A&PS.
Regular meetings are taking place with the contractors to enure progress continues to
be made. 
2.1.4 The Head of Centre and ELC practitioners have been appointed. Plans are in place to
fully resource and set up Heatherypark FLC as soon as an opening date is confirmed. 
2.1.5 The service is delighted to celebrate the opening of Newmains Family Learning Centre,
which is part of the Newmains/St Brigid’s campus. The new purpose-built facility is state
of the art and the staff, children, and families within the Newmains community are
thoroughly enjoying and benefiting from the space and resources the learning
environment offers. 
2.2     Workforce 
2.2.1 Committee will recall NLC employed 536 additional employees to support the
implementation of 1140 hours ELC. Just over 320 positions were temporary (Support
Workers & Keyworkers) and since November 2022 a recruitment process has been
progressed to secure permanency for these positions. There was recognition that due
to the large volume of these positions there was the potential to impact significantly on
the Council’s recruitment team if standard methods were used. As a result, there was
discussion with the Human Resource Business Partnership Manager, Human
Resource Business Partner Team, and Employment Service Centre. It was agreed to
implement a modified process to expedite the exercise. 
Page 6 of 167

Page 7

2.2.2 A series of briefing meetings was held to disseminate information via Heads and
detailed email instructions were issued along with Process Maps and Frequently Asked
Questions. Trade Unions were fully involved in agreeing the process and have been
updated periodically. The modified process has three stages: 
• Stage 1 – Professional dialogue took place for like for like vacancies in current
establishment for employees with qualifying service at 4/11/22. 
• Stage 2 - Professional dialogue took place for like for like vacancies in current
establishment for employees with qualifying service at 28/6/23.
• Stage 3 – Residual vacancies recruited by formal internal exercise via standard
method. 
2.2.3 Stage 1 and stage 2 are complete, which has resulted in the recruitment of 145
permanent posts. Stage 3 - recruitment for the remaining 174 part-time/full-time posts
commenced week beginning 10th April 2023. 
2.2.4 It is anticipated that the exercise will be completed by June 2023. Further updates will
be presented to future committees. 
Budget Setting Process 2023/24 
2.2.5 As part of the 3-year budget setting process it was agreed by the Council to review the
Early Learning & Childcare staffing structures and align employee resource to the
staffing model which was approved in 2019.   
2.2.6 A project plan has been developed to ensure that all HR/legal requirements are met in
addressing the realignment of the ELC staffing structures. This will ensure that all
communications, consultations, and risks are managed and enacted at the appropriate
time with the relevant stakeholders.   
2.3       Quality            
Early Learning and Childcare (ELC) Training Calendar 
2.3.1 A full catalogue of training for ELC Practitioners at all levels was established for August
2022 – June 2023. The training sessions offered were in response to need derived from
previous training evaluation forms, scrutiny visits carried out by the Quality Team, Care
Inspectorate and Education Scotland. Training courses are inclusive of both Council
and Partner Providers and sessions are added throughout the year in response to
need. 
2.3.2 To date 1,425 practitioners have attended one or more of the training sessions offered
within the ELC training calendar. The impact of practitioner skills and knowledge gained
is evident in the published Care Inspections from January 2023 - April 2023, where
almost all settings have achieved good or above in Quality Indicator 1.3 - Play and
Learning. In addition, 49 senior leaders are currently undertaking the ELC Leadership
Programme 2022-2023.  A full evaluation of the impact of training and development will
be undertaken in July 2023 to review the impact in relation to improving outcomes for
children and families. This evaluation will assist to inform next steps for the academic
session 2023/2024. Further updates will be provided to future committees. 
2.3.3 All training sessions for session 2022-2023 will continue to be a hybrid model of face-
to-face and virtual sessions. 
Page 7 of 167

Page 8

Quality Assurance 
2.3.4 The National Standard sets out what children and families should expect from their
early learning and childcare experience, regardless of where they access their child’s
funded hours. Scottish Government have outlined that children and families should
expect quality services with evaluations that rate good (4) or above. To support
continuous improvement the following activities and actions are undertaken to support
establishments to meet the national standards. 
2.3.5 The Quality Team carry out support visits to work alongside settings to evaluate and
monitor performance, to highlight good practice and provide support and challenge to
make improvements. 
2.3.6 Formal inspections / scrutiny is also a key aspect of the quality framework within ELC.
Education Scotland completes announced inspections using a variety of models. This
includes a full model inspection which covers four Quality Indicators (QI), and a short
model inspection which covers two QI. Some inspections are undertaken by both the
Care Inspectorate and Education. 
2.3.7 In addition, Care Inspectorate carry out unannounced inspections of both nursery
settings and childminders. Reference is made to the newly published quality framework
“A quality framework for day care of children, childminding and school-aged childcare”
(February 2022). The framework supports settings to evaluate their own performance
in addition to providing an independent assurance for care inspectors. 
2.3.8 As guarantors of quality, it is essential all services are fully supported in meeting the
National Standard level 4.  Currently 96% of ELC settings are graded at level 4 and
above.  Appendix 1 provides an overview of the standards of quality across ELC as of
April 2023. 
Head of Centre Induction Programme 
2.3.9 Taking cognisance of the increasing number of new Heads of Centre within the service,
a full and robust Induction programme was rolled out to new and existing Heads
between January 2023 and March 2023. The programme included an induction/review
of the operational requirements essential for effective service delivery linked directly to
education and families’ policies and practice. The programme was supported by
officers from Human Resource, Employee Relations, and Finance. 
2.3.10 The participants strongly agreed that the induction programme provided the necessary
foundation and information to support them in their role. 
Breastfeeding Friendly Scotland Early Learning (BFS EL) Scheme 
2.3.11 North Lanarkshire Council Early Learning and Childcare are committed to working
across communities to change attitudes and create a positive culture around
breastfeeding before any negative attitudes are formed. Links were established with
NHS Lanarkshire and the Scottish Government to achieve the Breastfeeding Friendly
Scotland Early Learning Gold Award. 
2.3.12 The aim of the scheme is to contribute to social and cultural change by promoting an
environment where breastfeeding is seen as the normal way to feed infants and young
children. 
Page 8 of 167

Page 9

2.3.13 The objectives are: 
• To promote an environment where breastfeeding is seen as the normal way to feed
infants and young children. 
• To promote informed infant feeding choices and responsive formula feeding.
• To support mothers wishing to breastfeed on our premises.
• To adopt a Breastfeeding and Returning to Work policy to assure pregnant and
breastfeeding employees that, should they wish to, they will be supported to
continue breastfeeding on return to work. 
• To be aware of local services where breastfeeding families can access support and
information and to signpost families to this support if desired. 
2.3.14 In order to achieve the Gold Award status for Early Learning and Childcare, 80% of
ELC establishments must achieve all set criteria to become an accredited
Breastfeeding Friendly setting. This target has been met and exceeded with 85% of our
ELC settings accredited with the BFS EL Gold Award. The remaining 15% are
continuing to take the final steps in achieving the award. 
St Patricks Family Learning Centre, Kilsyth - Global Citizenship 
2.3.15 Following a visit from the Scottish Children and Young People’s Commissioner to St
Patrick’s Family Learning Centre, Kilsyth, the children were asked to contribute to the
Draft General Comment No.26, Children’s Rights, and the environment, with a special
focus on climate change. The children’s thoughts, feelings, ideas, and voices were
captured as part of this process and included in the published document. This was
recognised globally as an amazing opportunity and achievement for all involved,
particularly for the young children of St Patricks Family Learning Centre. Please refer
to Appendix 2 for more detail. 
2.4 Early Learning and Childcare Framework 
2.4.1 Committee will recall that following the conclusion of the ELC tender process, to
establish an ELC Flexible Framework for 2023/2027, 138 providers were identified as
being successful. The Framework will commence on 1 August 2023. 
2.4.2 While the tender exercise has been completed, regarding identifying successful
providers, the process of establishing a sustainable rate is ongoing. Scottish
Government have advised that updated guidance and other support tools will be made
available, which will aid this process. Clarity is being sought re when this will be
available, and engagement will continue with partner providers re setting a sustainable
rate. 
2.4.3 Committee are advised that due to human error, a current partner provider - Kidstore
Nursery, missed the tender process for the 2023/2027 ELC Flexible Framework; it had
always been their intention to reapply. 
2.4.4 Capacity within the geographical area is limited, with the issue exacerbated due to the
changes in legislation for deferred entry, i.e., more children can automatically defer
entry to P1. At the planning stage of 1140 hours, this provider was included when
assessing capacity across North Lanarkshire. 
2.4.5 Approval was sought from the appropriate Chief Officers, and a Negotiated Tender
Process was undertaken, in line with Regulation 33 – Public Contracts (Scotland)
Regulations 2015. 
Page 9 of 167

Page 10

2.4.6 Following the required assessment process Kidstore Nursery were successful and
have entered into a Bespoke Early Years Agreement for 1 year (01 August 2023 – 31
July 2024). 
2.4.7 Kidstore Nursery, along with other providers, will have an opportunity to apply to be
part of the Flexible Framework at entry point 2. This will open around September 2023;
successful providers will join the framework on 01 August 2024 for a period of 3 years. 
2.5     Admissions 2023/2024 
2.5.1 Committee are advised that the admission process for session 2023/2024 is ongoing,
with the process nearing completion. 
2.5.2 The application closing date was 10 March, with 3,147 on time applications received
across all settings – local authority and partner providers. 
2.5.3 Table 2 provides a comparison with last year (2022/2023) and shows a 12% increase
in the total number of new on time applications received. 
Table 2 
Local Authority Partner Nurseries Childminders 
2022/2023 2023/2024 2022/2023 2023/2024 2022/2023 2023/2024 
Returners  2516  2492  1012  1185  103  72
New
Applications  1890  2072  852  974  77  101
Cross
Boundary  13  17  52  51  2  6
TOTAL 4419 4581 1916 2210 182 179 
2.5.4 The largest percentage increase in applications is to partner nurseries. If applications
are successful, this will result in increased external partner provider commission
payments going forward.   
2.5.5 In line with previous years, it is anticipated that late applications i.e., those submitted
after 10 March 2023, will be received. Updated data will be provided to members at the
next committee meeting.     
2.6     Cross Boundary 
2.6.1 Committee will recall that a Cross Boundary Protocol is currently in place for children
attending partner provider settings. Cross boundary local authority applications
continue to be progressed in line with NLC admission policy. 
2.6.2 While applications made to local authority establishments continue to be progressed in
line with the admissions policy, applications to partner providers (private/voluntary
nurseries and childminders) will be considered at the West Partnership Cross Boundary
meeting which will take place in mid-May. This meeting takes place at the latter stage
of the process due to those authorities involved operating to differing timescales re their
allocation of placements. The meeting allows for approval to be sought from those
authorities that applicants reside in. 
Page 10 of 167

Page 11

2.6.3 The cross boundary costs to 3rd March 2023 (Period 12) were £311k. This figure will
increase further as authorities/partners finalise their charges through to financial year
end. 
2.7     Deferred Entry 
2.7.1 Committee will recall that considering the forthcoming changes in legislation – effective
from 1 August 2023, it was anticipated that the number of automatic deferrals for
session 2023/2024, would increase in comparison to those in session 2022/2023. 
2.7.2 The change in legislation sees automatic deferrals being available from the day after
the term starts in August until the last day in February. Previously automatic deferrals
were available for January and February birthdays only. 
2.7.3 Table 3 outlines the increase in automatic deferrals – 88%, following the change in
legislation. Overall deferrals – automatic and discretionary, have increased circa 41%. 
Table 3
2022/2023 2023/2024
Automatic Discretionary Automatic Discretionary
Jan – Feb March – Aug Aug – Feb March - Aug
207 125 389 79
Total: 332 Total: 468 
2.7.4 Table 4 provides a breakdown of the number of deferred entry placements to P1 across
local authority and partner providers. 
Table 4 
Aug -Dec Jan - Feb March - Aug
2023/2024 Local Authority Deferrals 105 175 73
2023/2024 Partner Provider Deferrals 36 64 6
2023/2024 Split Placement Deferral  4 4 0
2023/2024 Not Attending a ELC Setting  0 1 0 
2.8      External Partner Provider Commission Payments 
2.8.1 Table 5 provides an overview of Partner Provider Commission Payments, from April
2022 to period 12. 
Table 5
External Commission Payments 
April to July August to March Total
3-5 Payments 1140
hours
£4.572m £8.345m £12.917m
Eligible 2 Payments
1140 hours
£0.328m £0.534 £0.862m
Meal Payments 2-5-
year-olds
£0.316m £0.624 £0.940m                                                                                            
Total £14.719m
Page 11 of 167

Page 12

2.9     Healthy Milk & Snack Scheme 
2.9.1 Committee will recall that there is a requirement for providers to re-register for the
Healthy Milk and Snack Scheme on an annual basis. In doing so this allows them to
update the figures re children in their care. 
2.9.2 Within the current session – 2022/2023, 79 partner providers have registered: 31 from
Partner Nurseries and 48 from Childminders. 
2.9.3 The registration process has now re-opened – April 2023, allowing new providers to
join the scheme. Further updates will be provided to committee. 
2.10     Review of the Sustainable Rate 2023/2024 
2.10.1 Under Funding Follows the Child, Councils are required to set an hourly rate that is
paid to partners providers in the private and voluntary sectors, including childminders,
to deliver the funded entitlement. Councils are also required to review the rate to ensure
it is sustainable and reflects national policy priorities, including funding to enable
payment of the Scottish Living Wage (SLW) to all childcare workers delivering the
funded entitlement. The SLW was increased from £9.90 to £10.90 per hour in
September 2022 and there is an expectation from Scottish Government that all partner
providers are committed to paying the SLW from May 2023. 
2.10.2 Committee will recall in November 2022 a reviewed hourly rate to deliver the funded
entitlement in partner providers was agreed and back dated to August 2022. Table 6
provides an overview of the hourly rates for funded entitlement in partner providers
since the inception of 1140 hours. 
Table 6 
3–5-year-olds (hourly
rate)
2-3-year-olds (hourly rate)
2019-2020 £5.55 £5.80
2020-2021 £5.55 £5.80
2021-2022 £5.55 £5.80
2022-2023 £5.77 £6.03   
2.10.3 The service previously reported that an annual review of the hourly rate would take
place, albeit this may not result in an increase.  This process will involves taking
account of national guidance and consistent approaches and methodology
implemented across the West Partnership.  Further updates will be provided to
committee, 
2.11    Change to 3 Year Olds Start Date 
2.11.1 Start dates, for children taking up their ELC placement, under the 2014 Order, state
that all 3-year-olds are eligible for funded early learning and childcare from the
beginning of the first term after the child's 3rd birthday.  Please refer to the link below
for details.
Starting and stopping dates for eligibility - Early learning and childcare: statutory
guidance - July 2021 - gov.scot (www.gov.scot) 
Page 12 of 167

Page 13

2.11.2 Councils can use their discretionary powers under section 1(1C) of the 1980 Act, to
provide funded early learning and childcare to 3-year-olds earlier than the statutory
start dates. 
2.11.3 Currently within NLC 3-year-olds taking up an early learning and childcare placement,
can do so the day after their 3rd birthday.  This start date falls out with the statutory
guidance, allowing children to commence their placement early. 
2.11.4 From academic session 2023/2024 the service will continue to offer early access to
funded provision; however committee are asked to endorse the change to 3-year-olds
start dates from the current position (day after the child’s 3rd birthday) to the beginning
of the first term after the child’s 3rd birthday from August 2024.  This is to enable the
service to accrue potential efficiencies to support the anticipated increase of deferred
A further paper will be brought to a future committee with a full breakdown of any
efficiencies. 
2.11.5 Committee are aware that from August 2023 the statutory entitlement to defer entry to
primary 1 has been extended from mid-August to the end of February. This change in
legislation ensures all children will continue to have access to two years plus of ELC
funded provision. 
2.11.6 The service will ensure this information is communicated effectively with parents during
the academic session 2023/2024 in preparation for the change from August 2024. In
addition, any parent choosing to access their child’s placement earlier than the
beginning of the term after their 3rd birthday will have the option to pay for this
additionality. 
2.11.7 Communications 
2.11.8 The service continues to meet regularly with both Care Inspectorate and Trade Unions
regarding delivery of ELC provision. Relations continue to be collaborative and positive. 
2.11.9 The Corporate Communications team continue to support ELC with all communications
to support the delivery of 1140 hours. Update deferred entry information has been
posted on the ELC website and communications has been prepared to support the
2023/2024 admissions process. 
2.11.10 Childminding week is a National annual event takes place week beginning 8 May 2023.
The service has organised a celebration on 10 May 2023 to recognise the support in
place for children and families from childminders across NLC (Appendix 03).  Further
updates will be presented to Committee. 
2.12    Financial Update                 
Revenue Budget 2022/23
2.12.1 The gross expenditure budget for ELC in 2022/23 is £61.321m which is partly offset by
the ELC Expansion Grant of £34.842m. The projected outturn for 2022/23 as of 3 March
2023 (Period 12) is a net underspend of £0.465m. 
Capital Budget 2022/23 
2.12.2 Since inception, the ELC Expansion (1140 Hours) Capital Programme has spanned
several financial years cumulating in new Family Learning Centres and renovations of
existing establishments across the authority. 
Page 13 of 167

Page 14

2.12.3 The Enterprise & Communities 2022/23 capital programme of £157.168m was
approved at Policy & Strategy Committee on 17 March 2022. The 2022/23 programme
has since been increase by £21.479m relating to carry forwards from 2021/22
(£5.796m) and additional external funding (£15.683m). Included in the approved
2022/23 capital programme, for Enterprise & Communities, is £2.192m regarding ELC
Expansion (1140 Hours). 
2.12.4 As at Period 12, the Service is projecting an overspend of £0.010m in relation to the
associated ELC Expansion (1140 Hours) capital workstreams. 
In addition, there was £0.537m of budget set aside for Covid The final bill has been
agreed as £0.391m. This underspend of £0.146m is included within the current year
projection, so if there is any clawback of this budget, then the 1140 capital spend
position could alter. 
3. Measures of success 
3.1  Children have access to funded entitlement of 1140 hours of ELC.   
4. Supporting documentation 
4.1       Appendix 1: ELC Standards of Quality
4.2       Appendix 2: St Patricks Family Learning Centre Global Citizenship
4.3       Appendix 3: Childminding Week 
Gerard McLaughlin
Chief Officer (Education - North) 
Page 14 of 167

Page 15

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The strategy of the service, as approved by the Education Corporate Management
Team (November 2017), is to positively target families who live in SIMD areas 1 – 4
to address disadvantage and barriers to success.  Consideration has also been
given to ensure that there is a mix of services within localities to support
accessibility and parental demand.   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐     
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
ELC expenditure for financial year 2022/23 will be contained within the available
budget provision. During the preparation of the 2023/24 Early Years budgets the
Service will critically review the pertinent issues highlighted in this report to ensure
activity can similarly be maintained within the available overall funding envelope.   
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Support in place from HR to support the ELC recruitment
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Consultations are ongoing with Legal regarding the the position with the ELC
procurement framework.
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data? 
Page 15 of 167

Page 16

Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The paper contains information regarding the delay of the ELC admissions
process, which may impact on the level of enquiries the ELC website will receive. 
A statement has been produced to keep parents/carers up to date.
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Delays to the admissions process 2023/2024 could impact on the timeline to
secure placements for all eligible 2-5-year-olds by August 2023. This will impact on
the statutory 1140 hours entitlement for children and families.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 16 of 167

Page 17

APPENDIX 1
Care Inspectorate information – April 2023 
ELC settings:
• 23 Family Learning
• 79 Nursery Classes
• 41 Partner Nurseries
• 121 Childminders
The pie charts below outline the percentage of settings who are meeting the national
standard and above (level 4,5 &,6) and those who require additional support (level 2 & 3) 
22%
44%
33%
1%
Family Learning Centres Inspection
Outcomes
Excellent Very Good Good Adequate
4%
50%
45%
1%
Nursery Class Inspection Outcomes
Excellent Very Good Good Adequate
Page 17 of 167

Page 18

2%
37%
54%
7%
Partner Nursery Inspection Outcomes
Excellent Very Good Good Adequate
3%
58%
37%
2%
Childninder Inspection Outcomes
Ecellent Very Good Good Adequate
Page 18 of 167

Page 19

The column chart below provides an overview of the percentage of all ELC settings care
inspectorate gradings: excellent, very good, good and adequate. 
22
44
33
14
50
45
12
37
54
7
3
58
37
2
0
10
20
30
40
50
60
70
Excellent Very Good Good Adequate
ELC Settings Inspection Outcomes (Total %)
Family Learning Centre Nursery Class Partner Nursery Childminders
Page 19 of 167

Page 20

APPENDIX 2
St Patricks Family Learning Centre Global Citizenship
Following a very successful visit last summer, the children and staff of St Patrick’s family
learning centre, along with some Primary 1 children from the neighbouring school, were asked
to contribute towards the Draft General Comment No. 26, Children’s
Rights, and the Environment with a Special Focus on Climate Change
Submission, of the Children and Young People’s Commissioner Scotland
(CYPCS) February 2023. During the first visit, the CYPCS team were
inspired by the ways in which children in the earliest stages of education
had their voices listened to and their views gathered and asked if they
could work with them to help contribute towards the General Comment.
Bruce Adamson, Children and Young People’s Commissioner spent 2
days in St Patrick’s family learning centre with Kevin Browne-MacLeod,
policy advisor. They explored how younger children can contribute to
children’s rights and the environment through a range of consultation
activities as part of General Comment 26. 
Three joint sessions were planned in the nursery which involved an environmental walk, small
group discussion, stories, and STEM activities.
Every member of staff in the setting had an opportunity to meet with the Commissioner and
his team to discuss the role of CYPCS, impact and links to the UNCRC.
They were impressed by the brilliant work that is happening in the family learning centre. Bruce
shared this on his Twitter page, and it reached the United Nations in Geneva who have
commented on the excellent practice in this setting.
This was an opportunity to share some of our fantastic work in ELC and beyond, as we took
the opportunity to showcase everything we do in terms of working with families, alleviating
issues around poverty and some of the wider achievements in other sectors within the North
Lanarkshire Council.
Link for further information:
https://childrightsenvironment.org/about/#:~:text=The%20Committee%20is%20creating%20a
,do%20to%20uphold%20these%20rights. 
Page 20 of 167

Page 21

APPENDIX 3 
Childminding week 2023
One of the Quality Officer and SCMA worked in partnership to celebration the North
Lanarkshire childminders for Childminding week 2023. This was a week-long celebration of
Childminding followed by the SCMA conference on Saturday 13 May in the Morning of which
all CMs had the opportunity to attend.
The event was held at Summerlee Heritage Centre, and there were many planned activities,
including operation play outdoors presented by specialist in large loose parts play.  The
children had excellent opportunities to build, explore and create with lots of different loose
parts.
Active Schools organised potted sports, ACEs, NHS Lanarkshire (vitamins and Breastfeeding),
organised face painting, bookbug sessions, Ziggy from Road Safety, and a treasure hunt. 
Page 21 of 167

Page 22

Page 22 of 167

Page 23

North Lanarkshire Council
Report
Education, Children and Families Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref GMcL Date 23/05/23 
Health and Wellbeing 
From   Gerard McLaughlin, Chief Officer (Education – North)  
E-mail mclaughling@northlan.gov.uk Telephone 
Executive Summary
This report is intended to update committee on the progress of the implementation and
development of the Roadmap to Recovery Mental Health and Wellbeing Plan, across the
Education and Families Service. The report will first update members on the development
of the Roadmap to Recovery, mental health, and wellbeing plan for children in North
Lanarkshire. 
The report focuses on the outputs and outcome measures coming from work carried out
through the Roadmap to Recovery, at the ‘what are we doing’ level within the Wellbeing
Quality Framework. 
The plan covers a number of factors that are significant in improving health and wellbeing.
This report will consider a range of developments and the measures of impact including
action to improve attendance, provision of approaches to develop supportive relationships
and positive mental health and wellbeing. 
Recommendations
It is recommended that the Education, Children and Families Committee:   
(1) endorse the content of this report  
The Plan for North Lanarkshire
Priority  Support all children and young people to realise their full potential
Ambition statement (7) Enhance collaborative working to maximise support and ensure
all our children and young people are included, supported, and safe
AGENDA ITEM 3
Page 23 of 167

Page 24

1. Background 
1.1 The Roadmap to Recovery mental health and wellbeing plan was presented to this
committee in September 2022. It set out a way forward in developing the health and
wellbeing of our learners over the period from August 2022-2025. This plan supports
the movement from the impact of COVID19 restrictions to a point beyond, with well-
developed health and wellbeing among our children and young people.   
1.2 The plan recognises the importance of structural and process developments in North
Lanarkshire in relation to health and wellbeing, including the Empowering Clusters
model and the GIRFEC pathway. It looks at high level outcomes that can be improved,
linking into the Integrated Children Services Plan and the Plan for North Lanarkshire. It
also looks at improvements in day-to-day operations and presents a format intended to
assist schools, centres and teams to improve health and wellbeing in line with quality
indicators currently used in improvement plans. 
1.3 Getting it Right for Every Child (GIRFEC) is the national policy framework for supporting
children and their families in Scotland. GIRFEC processes have existed in North
Lanarkshire for over 10 years, but the formation and development of the Education,
Children and Families Service required the ongoing development of existing GIRFEC
pathways to fit with revised operating arrangements and new guidance from Scottish
Government. Developments around GIRFEC were reported to this committee in
February 2023 and sit at the heart of the Roadmap to Recovery, as GIRFEC is the
process model that will deliver Health and Wellbeing improvements.   
1.4 Legislation identifies the key partners in GIREFEC as the local authority and NHS
Board. In practice many other partners work to deliver services to children and families
as reflected in the Children’s Services Partnership. The multi-agency nature of work to
improve the wellbeing of children requires developments in services to fit with, and
where possible develop with the involvement of key partners within the Partnership. 
1.5 A key element of the Roadmap to Recovery is the focus on getting the right help to the
right children and families at the right time. This requires the development of supports
at the additional level of the three stage GIRFEC pathway, in line with The Promise
which arose from the Independent Care Review and set out a range of measures and
approaches to improve the experience of children experiencing care or close to
requiring a care experience. One of the main elements of this is the provision of family
support following key principles of family support. 
1.6 The Roadmap to recovery identifies a number of impact measures that will demonstrate
the services ability to and impact of providing the right support at the right time to the
right children and families. This report will consider the following developments and the
measures of impact: 
• School Attendance
• Provision of Nurture and resilience training
• Trauma Informed Practice
• Early Intervention approaches to support good mental health.
• Staff Support Approaches
• Pupil Support and Curricular approaches
• Wellbeing Measures – SDQ and Outcome Star 
Page 24 of 167

Page 25

1.7 Previous reports approved by the Education and Families Committee, introduced and
updated the Wellbeing Quality Framework (Appendix 1), set around the questions of: 
• Why we are doing it? - Governance and Policy Drivers
• How we are doing it? – Key Systems and Processes 
• What we are doing? – Our Outputs and Outcome 
This report focuses on the systems and process and the outputs and outcomes that
are associated with the plan and these are linked to the Wellbeing Quality Framework
within the report.. 
2. Report 
2.1 School Attendance 
2.1.1 School attendance has been identified in the Roadmap to Recovery as a key indicator
of health and wellbeing in our children and young people at school. Attendance levels
are a key outcome in terms of the Wellbeing Quality Framework and this section will
also discuss systems and processes used to monitor and improve attendance. 
2.1.2 As part of the process of monitoring progress attendance monitoring has been set to
take place at three points in the year. Early December, Late March, and the end of
June. Previously it was reported to this committee that the December figures have
shown a 2% increase in attendance compared with 2021/22. 
2.1.3 Monitoring in March (Appendix-2) has shown that the increase in attendance has
reduced but is still above last year’s figure. Attendance improved across all our clusters
in the authority with every cluster showing a positive trajectory. The average increase
is 0.37% in attendance across the authority. As the December monitoring took place in
early December it appears that attendance issues around the Christmas holiday period
contributed significantly to the lower attendance figure in March. In future years
December will need to be a period of focused effort on improving attendance across
schools. 
2.1.4 A report to this committee in February 2023 highlighted that posts of Family
Engagement Support Assistant have been created through the use of Scottish
Attainment Challenge funding. These posts will work around the school clusters with a
view to supporting families to maximise school attendance of their children and
minimise exclusion. This follows a key theme in the Roadmap to Recovery around the
development of family support approaches as an additional level intervention,
particularly aimed at improving school attendance and inclusion. The posts will
particularly target families experiencing disadvantage and attendance issues. Our
monitoring data shows that families in the lower SIMD areas have greatest issues with
attendance, as shown below: 
Page 25 of 167

Page 26

2.1.5 So far 7 Family Engagement Support Assistants have taken up post and are working
with 99 families. Initial indications are positive with case examples showing quick
increases in attendance for some children and young people. As they took up post in
mid-December and built up their workload since then, comparative data is not yet
available to give significant outcome measures.  This will continue to be monitored and
reported on. 
2.1.6 Following COVID 19, School attendance is regarded as a significant issue across all
Scottish Local Authorities. A number of Head Teachers and central officers attended a
recent West Partnership event on Supporting Good Attendance. This demonstrates our
continued commitment to improving this measure through effective and informed
leadership. 
2.1.7 An action plan is attached to this report intended to improve attendance (Appendix 3).
The action plan focuses on four themes:
• Leadership and Management
• Relationships and communication 
• Systems and data 
• Intervention
• 
The plan also links to the three levels of the Wellbeing Quality Framework, which will
link to future evaluation and development. 
2.2 Provision of Nurture and resilience training 
2.2.1 The Educational Psychology Service (EPS) continue to support self-evaluation of whole
school nurture practice and coaching to embed whole school nurture approaches. The
delivery of this, and other related training, are key systems identified in the Wellbeing
Quality Framework to improve wellbeing. The nurture self-evaluation framework is used
by establishments to evaluate and improve their own approaches to nurture. EPS also
provide training on specific principles of nurture for staff in schools. EPS also continue
to deliver training on the Resilience Planning Toolkit (RPT) to build practitioner’s
capacity in analysis of GIRFEC assessment information and ultimately support in the
planning for children. 
2.2.2 To date, a total of 89 establishments have completed the Nurture Self-Evaluation
framework with 32 having undertaken training in session 22/23. Evaluation of the
training courses shows staff knowledge increasing through pre and post training
questionnaires. The scoring of these questionnaires shows a 33% increase in staff
knowledge from undertaking this training. This is shown below: 
70.00
75.00
80.00
85.00
90.00
95.00
1 2 3 4 5 6 7 8 9 10
ATTENDANCE BY SIMD LEVEL SECONDARY SECTOR
Page 26 of 167

Page 27

2.2.3 A total of 89 establishments have also undertaken Resilience Planning Toolkit training.
Of these 71 are primary, 8 are secondary, 6 are early years, 3 are ASN establishments,
1 is a SEBN establishment and in addition the Virtual School team have also
undertaken this training. This represents over 400 staff trained in nurture principles. 
2.2.4  A Nurture Sharing Practice Event was held in person in November 2022 that was
attended by staff from 21 schools across the authority. Evaluations from 23 staff who
attended indicated that 96% found the session to be very effective. Another Nurture
Sharing Practice Event is due to take place in March 2023. These events involve
establishments sharing practice to promote learning and development across   
2.3 Trauma Informed Practice 
2.3.1 The Roadmap to Recovery, and other key policy drivers within the Wellbeing Quality
Framework, identified that intervention around resilience and nurture underpin our work
to help children deal with trauma that they may have experienced, and this is a
developing area of work in line with national and local policy. As part of the
development, a Trauma Informed Practice in Education working group has been
established with representation from all sectors of the service. The group is considering
the tools and training that are already used that will promote the ability of staff to work
with the trauma of children they work with. 
2.3.2 Each child is unique and there is no set level of wellbeing that children should achieve.
Wellbeing is influenced by children’s individual experiences and changing needs as
they grow. A range of traumatic experiences can have negative effects on young
people. This might be one of the 10 recognised Adverse Childhood Experiences
(ACEs) or other adversities such as bereavement or bullying, or where a family is
affected by illness, disability or poverty. Each child should be helped to reach their full
potential as an individual. Previous reports regarding the development of GIRFEC
approaches have indicated how the cluster model of working has been used during the
pandemic period to identify vulnerable children and families to target appropriate
support. In moving from the pandemic period to a business-as-usual model, trauma
informed practice is required to develop further in each school and cluster to
appropriately support children, young people and families requiring additional or
intensive support. 
6.3
8.4
0
2
4
6
8
10
PRE-TRAINING POST-TRAINING
Average Staff Knowledge Ratings
Page 27 of 167

Page 28

2.3.3 NHS Education Scotland has developed a trauma training framework that identifies four
practice levels that are required for services that may come into contact with
traumatised individuals. The levels are: 
• Trauma Informed - The minimum standard for all staff. 
• Trauma Skilled – Aimed at staff likely to come into contact with people who have
experienced trauma.
• Trauma Enhanced- Workers who have a specific remit to respond to people
affected by trauma and provide advocacy support or interventions or are required
to adapt the way they work to take into account trauma reactions and reduce risk
of traumatisation.
• Trauma Specialist - Workers who have a specific remit to provide specialist
interventions or therapies for people known to be affected by trauma with complex
needs. 
2.3.4  The working group will make recommendations as to the level of training required for
staff at each level, However this illustrates the complexity of the task. Any member of
staff within a school may come into contact with traumatised children with some who
hold specific roles more likely to. Those who work in child protection, or have duties
related to care experienced young people will have to take account of trauma reactions
in the children they work with and adapt responses to lower risks of further
traumatisation. This indicates that staff within schools may require training to one of the
first three practice levels. Depending on role. This will be a significant task. 
2.3.5 The working group also attended the online Education Scotland input into Trauma
programme 'Keeping Trauma in Mind'. This is a series of five twilight sessions which
provides educators from all sectors with an opportunity to understand the impact of
trauma and develop trauma responsive strategies to support children and young people
affected by psychological trauma. 
2.3.6 NL Mental Health Strategy is a multi-agency strategy to develop a supportive and
stigma free culture, encourage resilience and address factors that may negatively affect
mental wellbeing. Representatives have been selected from Education & Families and
work should begin on this group in the coming months. This will align work going on
across services. 
2.4 Early Intervention approaches to support good mental health.
2.4.1 The Roadmap to Recovery set a target to increase early intervention mental health
approaches, particularly at the additional level of the three stage GIRFEC framework.
Developing this additional level of support improves the GIRFEC Pathway and the
cluster delivery model identified as key systems in the Wellbeing Quality Framework.
Four areas of input are now developing at this level of support: 
• The launch of Kooth 
• School Based Counselling
• Increased Counselling to P4 and 5 children
• LIAM  
• Pilot of Distress Brief Intervention (DBI) 
Page 28 of 167

Page 29

2.4.2 Kooth is a mental health support website that offers 10-18year olds (or up to 26 with
care experience) access to free and anonymous support. Through the website young
people can access counselling, self-help tools and community spaces to safely seek
mental health support. The service can be accessed 365 days a year, 24/7 and works
in partnership with other services in Education and Families and the NHS. Kooth has
now launched in North Lanarkshire and briefings have been carried out with staff to
promote awareness of the service. 
2.4.3 As reported to this committee in February 2023, development of School based
counselling was an action identified in the Roadmap to Recovery. School based
counselling is well used with a spend of 97% achieved in financial year 2021/22 and a
high rate of usage by young people. The success of this service has led to development
of the policy around the approach to locate it robustly within the staged interventions of
the GIRFEC pathway. 
2.4.4 As a result of the success of school-based counselling the Health and Social Care
Partnership have identified a funding stream which will be made available to Education
& Families to facilitate an intervention to a targeted group of children to increase health
and wellbeing outcomes. This, and other additional level approaches, have been
associated with a significant drop in demand for Child and Adolescent Mental Health
Services. In financial year 2023/24 and 2024/25 a total of £450,000 of additional
funding is being made available to increase the reach of the counselling approach. This
has been allocated to schools based on both school roll of pupils in P4 and P5 and total
population of SIMD 1-3, in order to target areas with the highest level of need. The
interventions consist of an offer of Play or Art Therapy. A short summary of key points
are outlined below: 
• Earlier intervention to complement counselling in schools service.
• Target group of children is P4/P5.
• Play and Art therapy inputs.   
• Predominantly group work, with some targeted 1:1 as appropriate. 
• Utilising approved providers from existing SAC/PEF framework for quality
assurance. 
• Funding allocated per cluster based on an approved model. 
• Funding accessed by Primary HTs through CIILs/cluster chair.
• Funding requests made must feature evidence of a robust needs analysis.
• Reporting framework in place to evidence outcomes 
2.4.5 In session 2021-22 a team of Educational Psychologists delivered LIAM to 52 children
and young people within their link schools. This is a 9 session CBT-informed approach
targeted at children and young people with mild to moderate difficulties with anxiety.
Potential children are identified through the named person, and appropriateness for the
intervention is then discussed with the LIAM supervisor. Currently 9 Educational
Psychologists are supervising staff in schools to deliver LIAM. Pre and post intervention
measures are taken around the anxiety that children and young people are
experiencing. The results from the first completed group are shown below: 
Page 29 of 167

Page 30

 
DBI provides connected and compassionate support to young people experiencing
emotional distress through a collaboration between NHS Lanarkshire, NHS24 and the 
Community and Voluntary Sector. North Lanarkshire is one of three areas of Scotland
where this model is being piloted with young people in schools and this is taking place
in three secondary schools. Since the start of the pilot in Febryary 2021, there have
been 172 referrals with referals numbers showing an increasing trend. The highest
referral numbers so far have been in March 2023. Intervention is provided on a quick
response basis with the option of referral into Child and Adolescent Mental Health
Services (CAMHS) where required. So far there have been only 7 referrals into CAMHS
across the three areas, indicating that early intervention is being effective.   
2.5 Staff Support Approaches
2.5.1 In delivering on nurture, resilience, and trauma informed approaches it is important to
provide appropriate support to staff who are working with emotionally challenging
situations. An important set of outputs aligned with the Wellbeing Quality Framework,
show activity levels around staff support. In recognising this the Roadmap to Recovery
set out staff support as an important element that will support success of the plan. In
August of 2022, at the same time of the launch of the Roadmap to Recovery, a new
Staff Support Education Support Officer took up post and has been delivering support
to staff involved in the delivery of the plan. The support of this officer is an additional
option for staff members beyond the support options provided to all employees. This
section will update members on the provision of staff support over this school year. 
2.5.2 Since August 2022 153 staff members have made use of the staff support service. The
distribution across sectors is shown in the chart below, it shows a broad distribution
across sectors, however it should be noted that as the ASN sector is relatively small,
the challenges of working in the sector appear to be associated with seeking support
0
50
100
Pre Score Post Score61 47
Mean Total Anxiety Score
(RCADS) (n=22)
0
5
10
First Session Final Session
1.9 8
Goal Based Outcomes (0-
10) (n=22)
Page 30 of 167

Page 31

2.5.3 The position held by staff seeking support is indicated below, which shows a spread
across the roles noted, however it should be noted that promoted staff represent 32%
of those seeking support, a significant number. 
Heads of Establishments 22 Employees  14%
DHT/PT   27 Employees  18%
Teacher   43 Employees  28%
Early Years    32 Employees  21%
ASN Support Staff  15 Employees  10%
Central Officer   4 Employees  3%
Other    10 Employees  7% 
2.5.4 For the majority of staff seeking support work issues featured, either as the main reason
they sought support or combined with personal issues. The numbers are as follows: 
2.5.5  Most staff seeking support were seen over 2-5 sessions, however a significant minority
were seen for 6 or more sessions. The breakdown by sector and number is as follows: 
22
12
27
35
CLIENT BASE SETTINGS
EARLY YEARS ASN SECONDARY PRIMARY
39%  WORK BASED ISSUE
25%   PERSONAL ISSUE
36%  BOTH WORK & PERSONAL
Page 31 of 167

Page 32

2.6 Pupil Support and Curricular approaches 
2.6.1 The provision of strong curricular and pupil support approaches is an essential
universal level foundation set out in the Roadmap to Recovery. Early intervention by
pupil support staff and universal approaches in school will reduce demand for
interventions through additional and intensive level planning within the GIRFEC
pathway. 
2.6.2  The development of pupil support staff has been an important factor in this delivery and
over the past year a Pupil Support Leadership Programme and an Introduction to Pupil
Support have provided development at two levels for appropriate staff. Additionally, an
‘Introduction to Counselling Skills’ course has been developed as a universal offer for
all staff, in all educational establishments. To date, 36 school practitioners have been
trained. This sits well with the early intervention counselling approaches discussed
above and serves as our universal offer to improve communication, relationships and
solution focussed approaches.  
2.6.3 The UN Convention on the Rights of the Child (UNCRC) is the most complete statement
of children’s rights ever produced and is the most widely ratified international human
rights treaty in history. The Rights Respecting Schools Award is intended to put
children’s rights at the heart of schools. The UK Committee for UNICEF (UNICEF
UK) works with schools in the UK to give the award to schools which can demonstrate
safe and inspiring places to learn, where children are respected, their talents are
nurtured, and they are able to thrive. The Rights Respecting Schools Award embeds
these values in school life and gives children the best chance to lead happy, healthy
lives and to be responsible, active citizens. Rolling out the award across schools is an
aim of the Roadmap to Recovery. The total number of schools in North Lanarkshire
who are involved with Rights Respecting Schools Awards is 123. 
2.7 Physical Activity 
2.7.1 The Roadmap to Recovery recognised the link between physical activity and good
health and wellbeing. In implementing the plan, the provision of physical activity has
been an important element. Data around this is in Appendix 4. 
0%
10%
20%
30%
40%
50%
60%
70%
80%
EARLY YEARS ASN SECONDARY PRIMARY
Number of Sessions
1 Session 2-5 Sessions 6 + Sessions
Page 32 of 167

Page 33

2.7.2 The Outdoor Education programme is run at Strathclyde Country Park and is led by a
team of staff formerly employed within Active Schools, supported by a team of coaches. 
The activities on offer at the park have developed significantly since 2020. This has
included the introduction of the climbing wall and rowing activities with Scottish Rowing
who are based at the park. On average, 93 young people from 2-4 school attend the
programme each week, taking part in a range of activities including: 
• Bikeability, giving every pupil the chance to reach level where they can cycle safely
on the roads. 
• Orienteering, starting from the new Rainbow shelter co designed with pupils. 
• Watersports activities on fun boats in the loch, supported by the parks stewarding
team. 
• Bushcraft and environmental education. 
• Rowing sessions delivered in partnership with Scottish Rowing, giving pupils the
unique chance to have experience this sport and receive tuition from high level
coaches.
• Highland Games
• Team building
• Archery   
2.7.3 In total 111 schools, including ASN establishments, are booked to take part in the
programme during 2022/23 academic year. During August to December 2022, 38
schools and 1,154 pupils attended the programme. In 2020 to 2021, 26 schools and
871 pupils attend the park, this increased in 2021 to 2022, when 95 schools and 2,630
pupils attended. 
2.7.4 The Active Schools team delivered high quality curricular activity during lockdown. This
moved to a hybrid approach of curricular and extracurricular activity in the COVID
recover phase and the focus is now on extracurricular activity. During August to
December 2022, there were 10,555 pupils attending extracurricular activities, resulting
in 116,863 visits. From August – December 21 there were 5,516 pupils engaged in
extra-curricular activities with a total of 51,164 visits. The activities on offer include
football, dance, badminton, netball and many more. 358 young people from secondary
schools were trained and delivered activity to primary school pupils. 
2.7.5 Girls in S1-S3 have been an important target group for increased physical activity. So
far in 2022/23 685 S1 – S3 girls participated in the SAC Active Girls programme across
all 23 secondary schools. 284 sessions were delivered that resulted in 5,852 visits. 
2.8 Wellbeing Measures – SDQ and Outcome Star
2.8.1 As previously reported to this Committee in November 2022, the further use of the
Strengths and Difficulties Questionnaire (SDQ) following its initial use in 2020 will take
place this school year. This would allow the gathering of comparative data from the
initial baseline, which would be useful in measuring progress in children’s wellbeing in
schools and planning further developments around the use of the GIRFEC pathway. It
will also show progress as regards the processes and interventions delivered as part
of the Roadmap to Recovery. Such measurement processes and outcome measures
are important elements of the Wellbeing Quality Framework. 
2.8.2 Since that date a group of officers has been in discussion with Youth in Mind, the
company that holds the rights to SDQ, and a timeline for the running of the survey a
second time was developed. The necessary work to carry out the survey has now been
carried out and the survey will start immediately after the spring break. 
Page 33 of 167

Page 34

2.8.3 The gathering of updated SDQ data will form an important measure in looking at the
success of the plan going forward through comparison with the previous data. 
2.8.4 Members may recall the Outcome Star Pilot being referred to in previous reports.
Outcome Star is a family of evidence-based tools for measuring and supporting change
when working with people, particularly around health and wellbeing factors. This has
been piloted for use in Education and Families, giving important, personalised outcome
data related work with children, young people and families. The use of this tool has
been piloted and information from that will form further expansion of use and measure
progress as regards the wellbeing of children, young people and families. 
2.8.5 Data from the use of outcome star shows that at the time of writing 344 stars have been
completed with 81 stars having been completed as second or third stars allowing a
measure of distance travelled as regards the wellbeing of the people they concern. The
spread of completed stars across sectors is as follows: 
2.8.6 At the point of reporting the data, the number of review stars is fairly low, however, an
analysis of all 1st vs 2nd stars across the authority is showing the greatest number of
improvements are seen in the areas of Feelings & Behaviour, Friends and Education
& Learning. As regards the number of areas that children, young people and families
show improvements in, the following can be reported so far:  
• 87% of children, young people and families have made progress in one outcome
area.
• 72% in 2 or more areas 
• 46% in 3 or more areas 
2.8.7 In summary the data shows a positive picture of improvement for those children and
young people and families in the sample: 
2.8.8  Outcome Star is identified in the Roadmap to recovery as an important source of
outcome data that can measure progress. The above data is encouraging but is based
on a relatively small sample. As the use of the Outcome Star increases more data will
3%
73%
6%
17%
1%
total stars by sector
Early Years Primary Secondary ASN Social Work
Page 34 of 167

Page 35

become available giving a fuller picture of the changes that health and wellbeing
interventions are making for our children, families, and young people. 
3. Measures of success 
3.1 The Roadmap to Recovery is planned to continue until 2025. Measures of success in
developing the wellbeing of children and families are set out in the Roadmap to
Recovery and will continue to be reported on. These link to the high-level measures in
the Plan for North Lanarkshire. 
3.2 Further increase in the use of Outcome Star will provide important measures of
progress in the development of health and Wellbeing in children, young people, and
families. This will reflect outcomes at individual level, an important area of
measurement in our development of processes and interventions to support health and
wellbeing. The sections of this report all link to the Wellbeing Quality Framework and
gathering this data will be crucial in using the Wellbeing Quality Framework to further
measure success.   
4. Supporting documentation 
4.1 Appendix 1 – Wellbeing Quality Framework
4.2 Appendix 2 – Attendance Data
4.3 Appendix 3 - Attendance Action Plan
4.4 Appendix 4 - Active Schools and Outdoor Education Information 
Gerard McLaughlin
Chief Officer (Education - North) 
Page 35 of 167

Page 36

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
The Family Engagement Support Assistant Posts have been funded, initially until the
end of March 2024, through the Scottish Attainment Challenge. This has been
approved through the Workforce Steering Group. As this is a reducing financial
envelope the funding and effectiveness of this approach will have to be revisited
before March 2024
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☒ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☒
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐ 
Page 36 of 167

Page 37

5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
The Roadmap to Recovery, the GIRFEC Pathway and the GIRFEC online tool all
have been communicated to staff. Work will continues using an online dashboard
and other reposts to keep a spotlight on attendance and other health and wellbeing
issues. 
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g., Corporate or Service
or Project Risk Registers), and how they are managed? 
Many of the interventions mentioned in this report are dependent of continued
funding, at a time of reducing budgets. As part of the SAC activity, the future of
Family Engagement Support Assistant posts and the related family support
approach poses a risk going forward. 
Given the stretch aims around improving attendance, the risk of failing to achieve or
sustain these stretch aims must be considered. The risk associated with the
implementation of SAC is regularly reviewed in line with Council arrangements. The
most recent internal Audit report gave assurance as to the efficacy of SAC planning
arrangements. Due to the downward taper of current funding within the Strategic
Equity Fund, close scrutiny of outcomes from this initiative will take place to assist
decision making around future achievement of the stretch aim.
5.10  Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes  ☐  No  ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the Armed
Forces community to make sure that they do not face disadvantage compared to
other citizens in the provision of public services.  
Page 37 of 167

Page 38

Appendix 1 – Wellbeing Quality Framework 
Page 38 of 167

Page 39

Appendix 2 – Attendance Data 
Page 39 of 167

Page 40

Appendix 3 - Attendance Action Plan 
Why we are doing this 
Attendance is set as a key measure of success in the roadmap to recovery. The
association between attendance and attainment has been well established and this action
plan is also likely to positively impact on the poverty related attainment gap, a key priority
for the service. 
In recent times, NLC has performed consistently well in external inspection processes
relevant to the HGIOS 4 quality indicator 3.1, Ensuring wellbeing, equality and inclusion.
However, this appears incongruent with our statistical profile for attendance which, at a
national level, is unfavourable. This action plan sets out current plans to support and
challenge this measure. 
Additionally, whilst this session’s Attendance Tracking Reports have identified that we are
on a positive trajectory across all sectors, further and sustained improvements in this
measure remain a priority! Of note, the gap in attendance profiles relative to SIMD profile
remains discouraging. 
How we are doing this 
In keeping with known evidence-based principles, the following universal themes are
central to our strategy for supporting good attendance: 
1. Leadership and Management – where the plan is prioritised and communicated. 
2. Relationships and communication - which foster a culture and ethos, where all are
valued, listened to, and included. A whole school approach is pivotal – supported
by our Roadmap to Recovery and cluster and partnership arrangements. 
3. Systems and data – clear and consistent systems in place, which are the
responsibility of all. Data analysis takes place at authority, cluster and individual
school level to give an accurate view and reasons for patterns. 
4. Intervention – these are targeted and in response to data intelligence. All are
planned and monitored for impact. Statutory guidelines are followed as
necessary. 
Page 40 of 167

Page 41

What we are doing - Action Plan 
Supporting 
Theme
What
1,2,3 &4 Continue to progress the work identified in our Roadmap to Recovery which is likely to
positively impact on attendance – Nurture/ Resilience approaches, GIRFEC, 
Counselling,Outcome Star, SDQ, Staff CLPL etc 
1 Continue to prioritise attendance and communicate approaches through central
events, including Headteachers meetings, pupil support network and health and
wellbeing champions 
1,2,3 & 4 All Education and Family Managers and central officers continue to work to
acknowledge and strengthen a prioritised approach to improving attendance. 
1, 3 & 4 Attendance measures included in central attainment reviews, improvement planning
processes and challenge conversations at school level. 
1.3 & 4 Develop understanding across the authority, clusters and individual schools of patterns
in attendance (e.g. lead up to Christmas holiday period) and develop approp[riate
responses. 
2, 3 & 4 Develop central resource allocation at additional GIRFEC level, including FESA
interventions and  child and family centred approach provided by partners at cluster
level 
3 & 4 Cluster Attendance Data dashboard developed to provide accurate monitoring data. 
3 SIMD Attendance profiles per establishment detailed and shared. 
2, 3 & 4 Follow up CIIL individual attendance planning reports within each cluster – identifying
what is working. 
1 & 3 Attendance target(s)/ outcomes to be detailed in all school improvement plans and
reports next session. 
1, 2 & 4 Continue to use network approaches to share identified good practice. 
Review
Centralised Tracking Report(s) to note progress at three points each year, before Christmas,
before the spring break and before the summer break. 
At Cluster level targets set and reported on by CIIL, detailing improvements and good practice in
clusters
.
FESA impact measured using attendance measures in SIMD 1-3 and outcome star at same
intervals as tracking reports. 
Page 41 of 167

Page 42

Appendix 4 – Active Schools and Outdoor Education Information  
•  
Page 42 of 167

Page 43

Page 43 of 167

Page 44

Page 44 of 167

Page 45

North Lanarkshire Council
Report
Education, Children and Families Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref  GMcL/GL Date 23/05/23 
School Holiday Consultation 
From  Gerard McLaughlin, Chief Officer (Education – North)  
E-mail McLaughlinG@northlan.gov.uk Telephone 01236 812269 
Executive Summary
Council has agreed that a consultation be carried out on proposals to reduce the summer
break by one week and adjust other term dates to accommodate.   
A non-statutory online consultative survey has been developed and will run from 28 April
2023 until 12 May 2023.  The survey is open, but not limited, to pupils, pupil councils,
parents, parent councils, teachers, support staff and trade union partners. 
A report on final outcomes will be presented to Education, Children and Families
Committee in September 2023.  Any implementation of these proposals would not take
place before session 2025/26. 
Recommendations
It is recommended that Education, Children and Families Committee: 
i) Note the approach taken to the council decision to consult on proposals to
school term dates. 
ii) Note the final outcomes will be presented at the next Committee in September
2023. 
The Plan for North Lanarkshire
Priority  Enhance participation, capacity, and empowerment across our
communities
Ambition statement
(10) Engage with children, young people, parents, carers, and
families to help all children and young people reach their full
potential
AGENDA ITEM 4
Page 45 of 167

Page 46

1. Background 
1.1 On 15 December 2022, a notice of motion was submitted to Council to consult on the
school holiday calendar.   
1.2 It was decided that a full consultation be undertaken seeking views on the “possibility
of reducing the summer break and increasing the October break to two weeks,
extending the February break to one week and/or an extension to the Christmas break,
as well as any other proposals from stakeholders”. 
1.3 It was further agreed that outcomes be brought to the Education and Families
Committee and that results inform council discussions with The West Partnership on
these matters. 
2. Report
2.1 The current arrangements for school holidays typically allow for seven weeks during
the summer break, one week in October, two weeks at Christmas, two days in
February and two weeks at Spring break (Easter).
2.2 The proposals being consulted upon are:
• The new school year/term would start earlier in August. 
To accommodate this:
• The October holiday would last for two weeks. 
Or
• The February break would be extended to one full week and the Christmas break
increased. 
2.3 Consultees have also been asked for any alternative proposals. 
2.4 A summary of the online questions is shown at Appendix 1 
3. Measures of success 
3.1  The consultation will provide valid and reliable data to support elected member decision
making.   
4. Supporting documentation 
Minutes of Council Meeting 15 December 2022
Minute North Lanarkshire Council 
Gerard McLaughlin
Chief Officer (Education – North) 
Page 46 of 167

Page 47

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 47 of 167

Page 48

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?  Notifications on the survey
will be issued to all stakeholders via group call.  If approved, the proposal would
require significant and early communication with a large number of stakeholders. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 48 of 167

Page 49

Appendix 1 
SURVEY QUESTIONS
1. Are you: 
 A parent or carer
 A pupil
 A Teacher 
 A member of school support team
 Representing a Parent Council
 Representing a Pupil Council
 Representing a Trade Union
 Other  
2. Forename
3. Surname
4. Email address 
5. School / Organisation 
 Establishments / Trade Unions / Other 
6. Do you agree with the proposals to shorten the summer break to 6 weeks? 
 Yes
 No
 Don’t know 
7. If Yes, would you prefer (select one): 
 Extending the October break to two weeks
 Increasing the February break to one week and increasing the
Christmas break
 Other: (please provide details): 
Thank You
Page 49 of 167

Page 50

Page 50 of 167

Page 51

North Lanarkshire Council
Report
Education Children & Families Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  GMcL/JW Date 23/05/23 
Developing Gaelic Language within North Lanarkshire
Leasachadh Dealbhadh Gaidhlig ann an Comhairle Shiorrachd
Lannraig a Tuath 
From  Gerard McLaughlin, Chief Officer (Education - North) 
E-mail McLaughlinG@northlan.gov.uk Telephone 
Executive Summary 
Through the delivery of the Gaelic Language Plan (GLP) North Lanarkshire has a
commitment to ensure that Gaelic is given equal status as a modern, vibrant language. 
Gaelic opens doors to another view of the world and gives us an understanding or our
history and culture and a clearer picture of the future. Gaelic has great value and
importance to us all. 
This paper will review and update Education Children and Families Committee on the
current Gaelic Language Plan 2022-2027. As previously advised the implementation of the
plan is subject to securing a robust funding model, and further information on the costs and
financial supports available for Gaelic education are included in the report.       
Providing detail on the service’s ambitions to deliver the Gaelic language Plan, dependant
on funding being in place and Scottish Government providing adequate funding. Through
this report, there are specific details made to ‘Gaelic education’. This term is used when
discussing matters relevant to both Gaelic Medium Education (GME) and Gaelic Learner
Education (GLE). 
Within North Lanarkshire there is a longstanding strength in Gaelic Education.  Gaelic is
not just about the inherited heritage of Gaelic, it is still alive today, used by pupils,
communities, parents and staff. This report will detail the plans for growth by committing to
increase the offer to pupils in schools to learn Gaelic as well as ensuring that opportunities
exist for the wider community. 
This paper outlines the current levels of joint investment in Gaelic Language activity,
including Gaelic Medium Education, by North Lanarkshire Council and Scottish
Government and the future planning agreed with Bord na Gaidhlig for its further evolution. 
AGENDA ITEM 5
Page 51 of 167

Page 52

1. Background 
1.1 Between 1999-2002, the Scottish Executive commissioned two reports on Gaelic: the
Macpherson Report and the Meek Report. Both reached similar conclusions,
significantly the creation of a Gaelic Language Act to give effect to the proposal of
secure status for Gaelic as set out by CNAG (Comann na Gàidhlig 1997). 
1.2 In response to these reports, the Scottish Executive established Bòrd na Gaidhlig in
2002. The Bòrd has a duty to promote and fund the development of the Gaelic
language, assist with the creation of Gaelic Language Plans and to co-ordinate
activities in support of Gaelic. 
1.3 The Gaelic Language (Scotland) Act commenced on 13th February 2006 and
established Bòrd na Gàidhlig as a public body which is responsible for the preservation
of Gaelic as an official language which enjoys the same respect as English in Scotland.
The Gaelic Language (Scotland) Act 2005 received Royal assent on 1st June 2005. 
The Act gives an official framework to the efforts to preserve and sustain the Gaelic
language and culture.  Bòrd na Gàidhlig, in partnership with other organisations, is
responsible for carrying out the provisions of the Act. The Education (Scotland) Act
2016 also contains provisions on Gaelic Education. These include placing a duty on
education authorities to promote and support Gaelic Medium Education (GME) and
Gaelic Learner Education (GLE). Alongside Education Scotland, Bòrd na Gàidhlig
develop guidance on Gaelic education and the development of GME under the
Standards in Scotland’s Schools etc 2000 Act. 
1.4 Currently, 16 of 32 local authorities offer primary Gaelic Medium Education, almost four
decades from the first primary units being established in 1985 in Glasgow and
Inverness with 24 pupils. 
1.5 According to the Scottish Government Pupil Census, there are currently 5066 pupils
taught in GME provision across Scotland. In November 2022, Duolingo released new
data revealing that 1.5 million people have started learning Scottish Gaelic on their app.
Recommendations 
It is recommended that the Education, Children and Families Committee:  
• Endorse the contents of the paper.
• Review the financial position of the current Gaelic programme and consider the
implications for further development of the programme.
• Approve the proposed plans for the expansion of Gaelic Education within North
Lanarkshire, which will be subject to funding.
• Acknowledge the impact for funding and staff recruitment has on service planning
and delivery. 
• Acknowledge the service will write to Scottish Government to further outline our
ambitious plans for GME in North Lanarkshire which have already been published
in the accepted GLP for 2022-2027 and to request additional funding to support
this. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (6) Raise attainment and skills for learning, life, and work to
enhance opportunities and choices
Page 52 of 167

Page 53

The primary motivation for learning the language is recorded as culture, with many
looking to reconnect with their heritage. (Sabhal Mòr Ostaig - uhi.ac.uk) 
1.6 The latest edition of the Gaelic Language Plan for North Lanarkshire Council was
approved by Bord na Gaidhlig in February 2022 and published in June 22. It is informed 
by both the National Gaelic Language Plan 2018-23 and The Plan for North Lanarkshire
to make it the best place in Scotland to live, learn, work, invest and visit. 
1.7 North Lanarkshire, along with other local authorities has access to national funding
streams to underpin Gaelic Education such as the Gaelic Specific Grant (GSG).
However, in general the available grants offer part funding and do not support the full
cost of Gaelic education, with the result that the Service has been incurring increasing
annual overspends in recent years to maintain existing levels of provision. 
1.8 North Lanarkshire’s provision for Gaelic Education is delivered through Gaelic learner
education, this is at the universal level which leads to learning at the additional level
currently within Greenfaulds. Gaelic medium education is the intensive level offer and
for learners out with school settings there is the community offer from Community
Learning and Development (CLD). 
1.9 North Lanarkshire’s provision for Gaelic Education through GME is celebrating 25 years
this year. The GME provision at Condorrat Primary was opened in 1998. Provision for
GME is now located across three establishments: Tollbrae Nursery Class, Condorrat
Primary and Nursery Class and Greenfaulds Secondary. 
1.10 Since opening Condorrat GME provision in 1997, records of P1 enrolments show that
there has been a total of 497 pupils enrolled. The graph below shows the enrolments
at P1 per academic session. 
Universal
Languages learning for all children, usually
offered through 1+2.
Additional
Gaelic subject learning, for pupils not
engaged in GME
Intenstive
GME specalist provision
Community
Gaelic learning opportunities outside of
formal education
Gaelic Education
Page 53 of 167

Page 54

1.11 GME in North Lanarkshire has regularly been celebrated nationally, with Education
Scotland and other learning events for young people. In 2018, Greenfaulds High School
was the winner of the Scottish Education Award for Gaelic Education. This recognised
the school’s approaches to developing the Gaelic curriculum. Condorrat Primary was
then a runner up in the same award in 2019. Condorrat was also featured in a Thematic
HMIe national report, highlighting the approaches used in the recovery of education
from the Covid19 pandemic. 
1.12 Both establishments actively seek ways to develop the creative skills of young people
through Gaelic and this has been recognised at events such as The Young Scot Awards
and the National Mod. 
1.13 The current numbers of young people who are part of Gaelic learning through GME are
detailed below, alongside the number of staff required to maintain this provision. 
Establishment Number of Pupils in Gaelic
Education
Sgoil Àraich Tollbrae (Tollbrae Nursery) 13
Sgoil Àraich Condorrat (Condorrat Nursery) 16
Bun-Sgoil Chondobhrait  (Condorrat Primary) 150
Àrd-sgoil Greenfaulds (Greenfaulds High School) 70 
Gaelic Education Staff within NLC
Establishment Number of Staff (FTE)
Bun-Sgoil Chondobhrait  (Condorrat Primary) 10
Sgoil Àraich Chondobhrait (Condorrat Nursery) 5
Sgoil Àraich Tollbrae (Tollbrae Nursery) 3
Greenfaulds Secondary 7.6 
Page 54 of 167

Page 55

1.14 At the key points of transition for educational session 2023/24, almost all children are
transitioning within the intensive level of GME. 
Establishment Number at stage of
Transition
Number
Transitioning
within GME
Number /Reason
not transitioning 
Tollbrae Nursery 7 6 1 – applied for
deferred entry
Condorrat Nursery 7 7 N/A
Condorrat Primary  21 20 1- Attending
Private School 
2. Report 
2.1 This report builds on the report presented to Committee in February 2021 and, taking
an evidenced based approach, seeks to ensure the GLP (attached in further reading
Appendix 1) is progressed in conjunction with the plan for North Lanarkshire and
through existing funding. 
2.2 To support this shared ambition, we have a bold vision for the strategic expansion of
Gaelic language and cultural activity in North Lanarkshire, which is grounded in the
understanding of the significant opportunities that investing in Gaelic language
provides.  
  
2.3 North Lanarkshire has long had links to the wider Gaelic Community right across the
Central Belt, and we are committed to further strengthening this through corporate
commitments to ensuring equal status for Gaelic in all areas of council business, and
through forming stronger ties with our communities and working with partners in
neighbouring authorities’ and beyond.  
2.4 Detailed within the GLP are a series of key actions which are to be delivered within a
5-year timeframe. The key actions are under the three National Priorities of :
• Increasing the use of Gaelic
• Increasing the learning of Gaelic
• Promoting the positive image of the language 
2.5 Almost all key actions of the GLP for both increasing the use and learning of Gaelic are
aimed to be year 1 and 2 delivery. Education, Children and Families will be the lead
service area for these. Evaluation will be integral to each of these and will be completed
with stakeholders to support future development, reporting and measuring impact. The
graphic below gives these in more detail for year 1 (2022/23). Further timelines will be
detailed in future reports and are contained in the GLP for North Lanarkshire, available
on the North Lanarkshire website. 
Page 55 of 167

Page 56

2.6 For educational session 2022/23, the service added a further temporary post of ESO
1+2 (Gaelic). The remit of this post holder was to support the development of the GLP
and the universal offers of Gaelic across all establishments. This commitment to Gaelic
Education and the further development of high-quality learning experiences across all
areas of Gaelic learning has been continued for session 2023/24. 
2.7 The table below details the Gaelic specific grant (GSG) income and expenditure over
the past 4 years and the increasing overspends linked to this provision:             
Financial Year SG Grant
(£)
Council
Core
Funding (£)
Total
Funding (£)
Expenditure
(£)
Overspend
(£)
2019/20 260,000 182,333 442,333 472,116 -       29,783
2020/21 260,000 182,333 442,333 503,776 -       61,443
2021/22 265,000 177,333 442,333 617,776 -     175,443
2022/23 260,000 182,333 442,333 814,728 -     372,395 
2.7.1 As per the table above, the overspend within Gaelic activity has been increasing over
the past 4 years and is an ongoing financial burden within the Service. In recent years
expenditure has increased predominantly due to rising transport costs. 
2.7.2 The proposed grant from Scottish Government for session 2023/24 is £260,000.
Through the annual bid process for GSG, the Service has requested funding uplifts but
to date have not been successful.     
2.7.3 The Service has earmarked resources within it’s allocation of additional teacher and
support staff funding to increase staffing within GME on a temporary basis during
Evaluation of Gaelic
Education
Establish Gaelic
Improvement Group
and Parents group
Collate Baseline data
for Gaelic education 
currently
Current enrolement
data for GME in
North Lanarkshire
Inital curricular
developments for
Gaelic education,
including Digital
SChool.
Baseline data of
learning pathway
opportunities for
children and young
people within GME
Begin expansion
planning process for
GME in North
Lanarkshire
Page 56 of 167

Page 57

academic year 2023/24. However as detailed in section 2.8.4 below, there are national
challenges to recruit within GME. 
Increasing the Use and Learning of Gaelic 
2.8 A first year key action of the GLP was to establish and maintain a Gaelic language plan
implementation group with senior representation from all Council departments. The aim
of the Gaelic Improvement Group, who meet quarterly is to report progress on the
implementation of the plan across the service areas.   
2.8.1 One of the high level aims of the current GLP is: 
to agree for the establishment of a Gaelic Medium 3-18 campus within the Council
Area. 
The establishment of a 3-18 hub would need to be aligned to the Council’s operating
model of town hubs and their planned development.   
2.8.2 The service plan to expand the intensive provision of GME would continue prior to the
development of a 3-18 hub, by developing a hub and satellite spoke model across the
locality areas. This is illustrated below. Any expansion of provision would where
required follow formal consultation processes and be discussed with the Gaelic Parents
Consultation Group, which has been established this session as part of the GLP.
Appendix 2 illustrates the ask that through the schools, went to all parents whose
children are part of GME.   
2.8.3 The expansion of Gaelic Medium Education (GME) will be impacted by a shortage of
probationer teacher allocation; challenges in recruiting Gaelic teachers/succession
planning, capacity in the system to accommodate the training required. These issues
are not unique to North Lanarkshire, but they are particularly relevant to note.
Acknowledging these challenges helps planning and enables us to prioritise and direct
all of our resources effectively. 
2.8.4 Staffing risks has been highlighted nationally in educational articles. The Scottish
Government is giving further consideration to the points raised. In response to the
article by Foxley and Roberston they said: 
Establishment of a standalone  immersive GME
early years and Primary provision within
Cumbernauld area
Continue secondary provision at Greenfaulds High
By August 2024
Development of Early years and Primary
GME centre within an exisiting English
education Provision in the Central Area
By August 2025
Development of Early years and/or
Primary GME centre within an exisiting
English education Provision in the South 
Area
By August 2026
Development of a 3-18 hub, in line with
town hub.
Page 57 of 167

Page 58

"Gaelic teachers are vital to this success and that is why we are continuing to work with
a range of partners, including the General Teaching Council for Scotland (GTCS), initial
teacher training institutions and Bord na Gaidhlig, to create pathways, such as the new
Gaelic additional teaching qualification at the University of Strathclyde, for those who
wish to enter the sector.” 
2.8.5 The learning pathways for young people who are part of additional and intensive offers
of GME are demonstrating pace and progression through the learning. The three tables
below show the progression of young people currently within Greenfaulds. These detail
the three types of learners, fluent, Gaelic learners and broader GME subjects. 
Table 1 fluent speakers 
Year Year total CfE (BGE) N4/5 Higher Adv Higher
S1 12 12      
S2 17 17      
S3 13 8  5    
S4 17   12 5  
S5 4    3 1 
S6 3     3 
Totals 66 37 17 11 1 
Table 2 Gaelic Learners 
Year Year total CfE (BGE) N4/5 Higher Adv Higher
S1 9 9   
S2 9 9   
S3 5 5   
S4 1  1  
S5 1   1 
S6 -    
Totals 25 23 1 1 
Table 3 Gaelic Education Subjects for learners not following GME Curriculum 
Year Year total CfE (BGE) N4/5 Higher Adv Higher
S1     
S2     
S3     
S4   1 Hist  
1 Art  
S5     
S6     
Totals   2  
Page 58 of 167

Page 59

2.8.6 The current leaver destination data for Greenfaulds High, shows that 12 of the 14
leavers for session 2021/22 entered a positive destination. All these young people
currently live within SIMD 5-9. There were 3 leavers in SIMD 1-3, one has progressed
to further education further education and in higher education. 
2.8.7  Education’s commitment to ensure that Gaelic is a vibrant language that young people
have equal opportunity to learn, will be developed at the universal and additional level
of provision. Currently Education have issued a languages survey to all establishments.
This will provide the baseline position following the COVID pandemic and subsequent
recovery period. This data will be used to further inform the next steps of Gaelic
education and the learning experiences for our young people.   
2.8.8 North Lanarkshire’s Digital School will play a key role to ensure Gaelic learning
opportunities are increased universally. In addition, they will develop with the ESO high
quality Gaelic specific resources for use at all levels of Gaelic education in North
Lanarkshire. The digital classrooms currently being installed across all 23 secondaries
in North Lanarkshire will increase capacity for additional level Gaelic Learning. Enabling
those, particularly at the senior phase to develop their learning pathways within Gaelic
education. 
Promoting a Positive Image of the Language 
2.9 The third key commitment of North Lanarkshire Council within the GLP is to promote
the positive image of Gaelic. During Seachainn Na Gàidhlig (Gaelic Week) A range of
community events took place across the authority. Qualitative feedback from the events
was positive. 
“Really relaxed and inclusive atmosphere, encouragement for everyone at any stage
of their Gaelic journey. Delighted with this event, would be great for the Community to
have more!” 
2.9.1 The creation of the ‘Why Gaelic?’ advertisement by Community Learning and
Development has had measurable impact with adult learners currently on the waiting
list. CLD have identified that expansion of the programme would include Gaelic
Language tutors. Funding for this will be sourced through Bord na Gàidhlig. 
2.9.2 A promotional campaign is currently being developed to celebrate 25 years of Gaelic
Medium education within North Lanarkshire. The campaign will outline and highlight
the three key commitments of North Lanarkshire Council’s Gaelic Language Plan and
provide vibrant information on routes into Gaelic education. This accessible resource
will be part of the continued work to celebrate the language of Gaelic in North
Lanarkshire today and the benefits of bilingualism. 
2.9.3 As part of its corporate branding initiatives, North Lanarkshire Council has incorporated
the Gaelic language into its logo to represent equal prominence for both Gaelic and
English. The Gaelic Improvement Group will now explore opportunities to develop this
further. 
2.9.4 North Lanarkshire Council’s website has been updated with a dedicated page on Gaelic
learning and provision across the authority. The webpage shares information on the
benefits of bilingualism for children and signposts further research. 
Schools which offer Gaelic Medium Education and Community Learning and
Development regularly post content in Gaelic. The aim is to increase the amount of
Gaelic content on social media each year by 5%.
Page 59 of 167

Page 60

2.9.5 CLD tutors as a whole currently deliver classes at Beginner, Intermediate and
Advanced level to 75 registered learners. Classes are delivered in person and online,
using Microsoft Teams.  There are currently 41 individuals awaiting allocation to a
Gaelic class when availability arises. Additionally a new class was recently started
based at the Gaelic Medium Educational Resource Condorrat Primary School, aimed
at parents of children attending GME education; presently ten parents are enrolled in
this class.   
2.9.6 All classes run weekly and use the ‘Speak Gaelic’ Resources, developed by the
National Gaelic College Sabhal Mòr Ostaig. Plans are currently underway for what will
be a monthly conversation circle initially, offering enhanced opportunity for learners to
use their Gaelic skills in a more informal setting. 
2.9.7 Further to the learning opportunities, the team organises Community based events to
encourage and promote Gaelic Language and culture. In the past year, this has
involved a Community Picnic for all ages in August 2022, Fèis Lannraig a’ Tuath which
attracted more than 50 participants, a Gaelic Day, Àm airson na Gàidhlig in February
2023, which took place as part of World Gaelic Week/ Seachdain na Gaìdhlig, as well
as a concert in the same week featuring renowned Gaelic singer Joy Dunlop. A further
workshop was delivered with writer Maya MacGregor who writes through the medium
of Gaelic. The workshop was delivered at Greenfaulds High School in the Gaelic
Medium Unit, to pupils at varying levels of Gaelic learning and focused on writing skills
and creative writing; this was delivered through the medium of Gaelic. 
2.9.8 Through the Gaelic Improvement Group, services broader than education will have a
timeline to develop their associated key actions on the Gaelic language plan. 
Next Steps 
2.10 As detailed throughout the report, Education, Children and Families have identified
specific next steps which will develop a range of aspects of the GLP and ensure that
Gaelic is continuing to be a vibrant modern language which enables our young people
to develop wider routes to learning life and work.  Central to the development of the
GLP and the expansion of Gaelic Language will be to consult with parents. The newly
created Parents’ Consultation Group will meet termly with key officers to consult and
report on the plan. This will be in addition to school-based consultation and any legally
required statutory consultation through expansion of provision within GME. 
2.10.1 A future report will be brought to committee, giving a full update on the progress of the
GLP and the expansion of Gaelic learning within North Lanarkshire. 
2.11 Continue to develop the working with Comann nan Pàrant, to increase Gaelic
opportunities for children, young people and their families. Using GME establishments
to host and support key events, which celebrate the positive image of Gaelic and the
learning opportunities within North Lanarkshire. 
3. Measures of success 
3.1  Continued development of high-quality Gaelic Education as a vibrant and modern
language for the children and young people of North Lanarkshire. 
3.2 Increasing volunteering and wider learning opportunities for all young people,
particularly those in the senior phase at Greenfaulds High. 
Page 60 of 167

Page 61

3.3 Delivery of the GLP and the high level aims and associated key actions detailed within
the plan.     
4. Supporting documentation 
4.1 Appendix 1 - North Lanarkshire’s Gaelic Language Plan 2022-2027 - Measadh
(Teamplaid 2019) (northlanarkshire.gov.uk)
4.2 Appendix 2 - Gaelic Parents Consultation Group 
Gerard McLaughlin
Chief Officer (Education - North) 
Page 61 of 167

Page 62

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance?|\ 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The Scottish Government provide annual revenue funding through the Gaelic
Specific Grant (2023/24 £260,000) and General Revenue Grant (2023/24 £87,000).
The Service is required to support the balance of funding required to maintain the
Gaelic programme including transport costs.
The Service is also using national teacher and support staff funding to increase on
a temporary basis the number of school based staff and engage an ESO during
2023/24. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The additionality in staffing for session 2023/24 is  4.2 FTE for Greenfaulds, this is
made up of 2.6 staffing which enables the service to meet curricular needs, place a
member of staff who has completed Immersion this year and retain a finishing
probationer. 
0.8  probationer for Condorrat and the 1 FTE equivalent from March to June 2024,
allows the service to retain the finishing probationer, who will from Aug 23- March
24 cover a Mat leave. 
All additionality is for an agreed 1 year period until June 2024. 
The service has identified within the paper the challenges to recruit into the GME
side of Gaelic Education. This will remain a challenge and a risk to future
development of provision. 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Page 62 of 167

Page 63

Discussions have started with legal on any possible statutory consultations which
may be required as a result of service expansion. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
The key risks identified within the paper are those within finance and HR, which if
unable to meet would have an impact on the running of Gaelic education within
North Lanarkshire. This will be added to the service risk register. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 63 of 167

Page 64

Appendix 2
Gaelic Parents Consultation Group 
Page 64 of 167

Page 65

Page 65 of 167

Page 66

Page 66 of 167

Page 67

North Lanarkshire Council
Report
Education, Children and Families Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref JO’N/PO’N/GK Date 23/05/23 
Progress report on Future Fridays 
From  Janie O’Neill, Chief Officer (Education - South)  
E-mail oneillja@northlan.gov.uk Telephone 
Executive Summary
This report provides a progress update on the Future Fridays programme as it reaches the
end of its second school session. 
Future Fridays Enrichment Afternoons aim to provide opportunities for all young people
within school communities to improve health and wellbeing, build relationships, develop
leadership capacity and gain employment and enterprise experiences by developing skills
for learning, life and work. 
Through these programmes young people in North Lanarkshire will gain additional
accreditation and wider achievement awards whilst participating in a wide range of in-
school and out of school activities which will develop skills for the world of work. The
programme offers significant opportunity for schools to support young people outwith the
traditional classroom setting within a flexible curriculum ensuring equity for all learners
across North Lanarkshire. This extended curriculum opportunity allows for a wider
curriculum more bespoke to the needs of all our young people. Future Fridays also
underpins the aims of the new Programme of Work theme, ‘Brighter Futures’. 
Recommendations
It is recommended that the Education, Children and Families Committee: 
1. Note the current progress in attendance, accreditation, Developing the Young
Workforce (DYW) and skill building. 
2. Endorse the next steps planned to enhance attainment, develop skills and
increase work related learning opportunities whilst targeting specific groups of
young people. 
3. Approve that further reports are brought to committee to report on progress.  
The Plan for North Lanarkshire
Priority  Support all children and young people to realise their full potential
Ambition statement (6) Raise attainment and skills for learning, life, and work to
enhance opportunities and choices
AGENDA ITEM 6
Page 67 of 167

Page 68

1. Background 
1.1 In 2021 a new secondary school schematic timetable was devised to support the launch
of a new asymmetric school week with an Enrichment afternoon, Future Fridays. The
new schematic timetable allows North Lanarkshire schools to provide a core curriculum
of 26.67 teaching hours, with individual schools given the autonomy to add an
additional 50 minutes of registration each week (27.5 hours).  The Scottish Government
are currently consulting on mandatory teaching of 27.5 hours, Future Friday enrichment
afternoon sessions offer young people in North Lanarkshire up to 29 hours of
education. 
1.2 This expanded curriculum delivers a wide range of programmes, activities and
qualifications in areas including health and wellbeing, sport, creative arts, employability,
digital and more. 
The aim of Future Fridays is to:
- Increase wider achievement opportunities
- Improve physical and mental wellbeing 
- Enhance opportunities for high quality skills and work based learning 
- Improve positive and sustained post-school destinations. 
1.3 This programme began in August 2021 with Principal Teachers (PTs) in each school
supporting the organisation and development of the programme. The role of the PTs is
to co-ordinate and plan sessions each week, monitor and increase attendance and
attainment / achievement opportunities from Friday afternoon sessions. 
1.4 Supported by a Curriculum Manager, PTs meet regularly to share good practice.
Weekly updates are issued to help focus and direct the programme in line with our
aspirations (highlighted above in section 1.1). 
1.5 In June 2022 evaluation data from year 1 highlighted an average attendance for the
year of 11.5% (approx. 2400 young people) of young people engaged on a weekly
basis. 
Future Fridays activities in year 2 have been divided as follows:   
Universal offer - sessions which rotate around all mainstream secondary schools based
on labour market intelligence and developing skills for learning work and life beyond
school. 
School based offer - specific sessions, bespoke to each school based around needs /
wants of young people. 
Intensive offer – Targeted to specific groups to meet individual needs designed to close
the gap and designed to provide more opportunities for specific target groups. 
2. Report 
2.1 Since its inception in August 2021 Future Fridays has grown considerably. The
opportunities afforded to young people have increased substantially. Across our 23
mainstream secondary there are currently 108 offers covering a range of activities.
(Appendix 1 outlines the range of in-school activities on offer.) 
2.2 Attendance rates have risen since August 2021 with around 23 percent (approx. 4850
young people) of young people engaged each week in opportunities available. 18 of 23
secondary schools have currently surpassed the 2023 DYW Delivery Plan target of
20%. The target attendance rate for session 23/24 is 30% and session 24/25 target is
40%. Current data indicates that over 60% of young people have attended at least one
Page 68 of 167

Page 69

AUG 21                   DEC 21                      AUG 22                    DEC 22
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
Future Fridays  average attendance across NLC
session.  34% of attendees are from SIMD 1-3 and 12% of attendees have additional
support needs. Data also highlights an average of 18.5% of care experienced young
people engaged each week. The DYW Delivery Plan has promoting attendance of
vulnerable groups as a priority for year 3 of Future Fridays. 
2.3 Developing the Young Workforce opportunities have grown in each school, with the
October 2022 DYW/Employer Engagement Conference providing an excellent conduit
to build relations between schools and employers. Employers from a wide range of
sectors including construction, health, retail and digital are providing sessions on Friday
afternoons focused on raising awareness of jobs and learning skills in a real-life context
as well as providing work placements for young people in the Senior Phase of Learning.
Employers are beginning to provide curriculum content around growth industry sectors
for school delivery. 
2.4 PTs have engaged in career long professional learning sessions led by the Curriculum
Manager. These have included inputs from colleagues from SQA and SCQF to
consider how sessions being offered can be accredited. These sessions have helped
to grow accreditation opportunities. Schools are using funding and the opportunity
afforded on Friday afternoons to certificate young people with industry recognised
qualifications in areas including construction, Barista skills and food hygiene.
Opportunities for accreditation have grown significantly as the programme has
matured, this has been a focus in Principal Teacher, sharing practice sessions
throughout the year and will be a primary focus in year 3. In year 2 we have almost 500
accreditations through the following. 
Page 69 of 167

Page 70

Session Level (If appropriate) Numbers
Youth achievement  38
Leadership  5 5
REHIS  55
CSCS Card  6
Climate path  8
First aid  48
Dynamic youth  18
Saltire  53
Work Placement 5 22
SQA Volunteer 4 61
NPA 6 6
Mentors in Violence prevention  8
Duke of Edinburgh Bronze  27
Barista skills  10
Heart Start  37
Boxercise   7
Pool lifeguard  12   
2.5 Future Fridays promotes Pupil Voice and provides an opportunity for young people to
contribute to the planning and development of the sessions which run each Friday
afternoon. Account is taken of young people’s views when building the Future Fridays
curriculum. Opportunities offered during the enrichment afternoons help young people
enhance and develop new skills for life beyond school and into the world of work. These
can then be used to enhance their CVs helping transitions into casual, part-time or full-
time employment. In school activities (Appendix 1) along with college classes and the
universal offer, represent the highest levels of attendance, however, young people do
have an opportunities out with school via Active and Creative Communities to use NLC
facilities to swim, go to the gym, take part in youth groups and clubs run by CLD, or
develop their skills through other work related learning opportunities. 
2.6 Empowering young people and leadership development is at the heart of Future
Fridays helping to improve confidence and communication skills. The launch of the
Future Friday’s  Leadership Academy in schools has seen over 100 young people work
with cluster primaries leading sessions in dance, STEM, enterprise, sports, arts and
digital. This has become a part of primary school transition programmes and this
coming academic session (2023/24) will see wider accreditation opportunities for young
people at SQA level 5 (S5) and level 6 (for returning S6 pupils) on successful
completion of the programme. Year 2 of this programme will launch in June and there
is scope to increase the number and range of academies as well as the number of
young people engaged. 
2.7 Schools promote Future Fridays through newsletters, websites and Twitter. North
Lanarkshire Council’s Future Friday’s website has been updated and will include a link
to a Future Friday’s blog which will showcase photos and case studies from across
schools, highlighting to all the exciting opportunities available in Future Friday sessions. 
2.8 Case Studies (Appendix 2) have been generated in each school, highlighting the
successes through Future Fridays. The programme is growing based on the input from
all stakeholders with the aim to meet with needs of all young people.
Page 70 of 167

Page 71

2.9 The core annual budget for the Future Fridays programme is £0.45 million which funds
direct staffing costs, pupil transport and external partner payments. In addition, the
successful implementation of the programme has helped direct and align wider
resources across the council and partner agencies to enhance the range and quality of
offers for young people. Staff groups contributing to the programme currently include
CLD, Pathways, Active and Creative Communities, Active Schools, Financial Inclusion
and local colleges. Finally the in-kind benefit of teaching staff who volunteer on Friday
afternoons is estimated to be in the region of £800,000 per annum and this value is
likely to increase as more offers and courses are rolled out. 
Next Steps 
2.10 We will continue to build on current progress and develop the Future Friday’s
programme through the following:
• Have all schools engage in a comprehensive evaluation which considers the
views of all stakeholders, parents and young people. 
• Schools will identify improvement priorities, highlight current success, capacity
for improvement and how they will achieve this. 
• Schools will use SDS 16+ datahub information to develop sessions relevant to
career pathways and will use school data to ensure target groups have
increased opportunity to engage to provide more equity in offer.
• Review and increase the Universal offer to engage more young people across
all schools and continue to relate to labour market intelligence. 
• Schools will increase accreditation opportunities through SQA and SCQF and
wider achievement frameworks to provide more certification for young people
which will help to enhance CVs and personal portfolios. 
• Good practice will be highlighted and share ideas across schools to ensure
equity for all young people.  
• We will continue to build on feedback from DYW conference, engaging with
local business to provide more work-related experiences and opportunities and
to create curriculum content linked to key industry sectors. 
3. Measures of success – Year 3 
3.1  Overall attendance for each school above 30 %
3.2 50% of young people from SIMD1-3 engaged
3.3 40% of all care experienced pupils engaged 
3.4  2 formal influencing business partners engaged in each school
3.5 Increased attainment measures (presentation numbers) 
3.6 Improved and sustained leaver destinations
3.7 Improvements in wellbeing 
4. Supporting documentation 
4.1 Appendix 1 – in school offers
4.2 Appendix 2 – Case studies 
Janie O’Neill
Chief Officer (Education – South) 
Page 71 of 167

Page 72

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
The DYW plan is a subset of the wider Workforce for the Future Strategy of North
Lanarkshire Council.
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Page 72 of 167

Page 73

Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
As part of promotion the communications team will work with the curriculum
manager to promote website and school activity using media channels. 
5.9 Risk impact
Is there a risk impact?
Yes ☐ No ☒
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 73 of 167

Page 74

Appendix 1 – in school offers 
ARCHAEOLOGISTS DRIVING NETBALL
ART E SPORTS NL CHALLENGE
BADMINTON EMPLOYABILITY PATHWAYS
BARISTA ENTERPRISE PHOTOGRAPHY
BAKING FISHING PODCAST
BASKETBALL FITNESS POTTERY
BIKEABILTY FORMULA 1 PSYCHOLOGY
BMX FOOTBALL RAF WORKSHOP
BOARD GAME GAELIC READING
BOOK GARDENING ROWING
BOXING GOLF ROLE PLAY
BOXERCISE GYMNASTIC RUGBY
BSL HANDBALL SCHOOL MAGAZINE
CAREERS
WORKSHOP INTERHOUSE SCHOOL SHOW
CHARITY IT SCIENCE
CHOIR JEWELLERY STEM
CITIZEN KARATE STUDY
COLLEGE LIVING LIFE TO FULL TABLE TENNIS
COMIC LANGUAGE TEXTILES
CROCHET LEADERSHIP THERAPET
DANCE LGBTQ TRAMPOLINE
DODGEBALL MAKE UP UNIVERSITY TALKS
DEBATE MENTORING VOLLEYBALL
DIG ILLUSTRATION MENTAL H A WOODWORK
DofE MINDFULLNESS WK EXP
DRAMA MOVIE WRITING 
MUSIC PERF YOUR RIGHTS 
MUSIC PROD 
Page 74 of 167

Page 75

Appendix 2 – Case studies 
Case study 1 
With a recent Autism diagnosis, pupil N was a total non- attender at their previous
school and experienced anxiety, difficulty in forming friendships due to very rigid
thinking as well as some health issues. They joined the Language and Communication
Centre (LCSC) at X High at the start of S2 and slowly began to develop confidence and
positive relationships in a safe and nurturing environment. 
When Future Friday started, Pupil N saw an opportunity to develop their passion for
baking and cooking and asked if a this might be a FF activity. Now, with the support of
the HSPO, N organises and delivers the baking session each Friday afternoon. 
This volunteering role includes consulting with the S1 pupils on what they want to make,
sourcing recipes and working out quantities. They also make sure the food delivery is
stored away properly then prepares for the session by setting out and weighing the
ingredients in advance. They plan and lead the session, taking everything from safety,
timing and tidy-up into account. Quite apart from the excellent organisational and
leadership skills they are developing, they have carried their peer mentoring and
nurturing qualities back to supporting other young people in the LCSC, all of whom also
have additional support needs. 
The LCSC staff comment on how proud they are of the progress – which is due to their
care and encouragement undoubtedly, but also developed and enhanced by the
opportunity to take responsibility for the FF activity with the support of the HSPO.
Through the opportunities given by participating in FF activities, pupil N now confidently
works with new adults, seeks out vulnerable peers to support them and has become
skilled at building relationships. As a result of working with S1s at FFs, they are now
considering a career in working with children. 
LCSC staff say “2 years ago this would have been inconceivable and through the whole
range of supports (including CLD involvement through FF) they have had the
opportunity to be their real self” And the attendance? – from 0% to 60% – so still room
to progress that, but this same person is staying behind in their own time every single
Friday, to do something they love and are finding extremely rewarding. 
Case study 2
Pupil R of our young people in S2 has a serious visual impairment. He has been
attending the Digital Illustration Club for some time now and it is proving to be very
beneficial for him in so many ways. At the start of the year Pupil R really suffered with
lack of self-confidence and self-esteem. He also didn’t have a set friendship group and
really struggled to make friends at times.  Since attending Digital Illustration club at
Future Fridays Pupil R has made some great new friends and even found a best friend.
He has learned new skills that he can use for life and work after school and also made
work that he can be proud of. The experience has really helped him grow in confidence,
develop his interpersonal and social skills and become more independent. He is now
working on preparing work for an upcoming Digital Art and Illustration Exhibition which
we are hosting in school in June. I recently spoke on the phone with Pupil R’s Mum and
she said that she couldn’t thank us enough for the work we do at Future Fridays and
spoke about how it has benefited Pupil R massively. She said that she has seen a huge
positive change in Pupil R since he has been attending Future Fridays and that he is
now much happier at school. Pupil R is now even considering starting his own Chess
Club on Friday afternoons in the near future. I am so proud of how far Pupil R has come
and I look forward to seeing where Future Fridays can take him in the future.    
Page 75 of 167

Page 76

It has helped so many of our young people socially and emotionally. I also feel that it
has been great for moral in the school as pupils are looking forward to their Friday
afternoon activity. There has been so many little moments of magic through the whole
experience where young people who struggle and have barriers to learning in class
really get their chance to shine during Future Fridays time and that's amazing to see
and it makes all the hard work seem worthwhile. 
Case study 3
Pupil A, an S4 girl, has attended the Dance Leader course on a Friday afternoon. The
desire for a Dance Leader opportunity was identified through pupil surveys on Teams,
where a number of pupils identified dance as an area they would like to explore during
Future Fridays time. This, along with conversations between teachers, parents and
pupils, made it clear that dance would be a popular choice throughout year groups. We
signed up 15 pupils, ranging from S2-6, to the Dance leader course where they would
receive a National 4 qualification after a 16-week block.
This course was delivered by the Y-Dance organisation and looked to develop each
pupils’ confidence within dance and also develop their ability to lead dance sessions
both as a group and on their own. Pupil A already attended dance classes outside of
school but as of yet had not led any sessions. Over the course of the 16-week block,
pupils were slowly introduced to the concept of leading sessions as their confidence,
creativity and organisational skills were improved. Pupil A developed a real strength in
both planning and delivering dance sessions and became a leader within the group.
Pupil A thoroughly enjoyed the sessions and it was a pleasure to see her ability as a
leader in this environment develop as the year progressed. As well as achieving a
National 4 qualification and developing many other skills, pupil A has expressed a
desire to lead her own dance club within the school that will open up the possibility of
her achieving more SQA awards as well as further developing her leadership and
responsibility skills. Off the back of completing the Dance Leader course, pupil A has
also stated that she wishes to progress onto a career in teaching or coaching and being
part of the Dance Leader course as further reinforced her desire to do so. 
None of these opportunities would have been possible without the Friday afternoon slot
and Pupil A, along with the rest of the Dance Leader class, have not only achieved
another SQA qualification, but also further developed their knowledge within their area
of passion. 
Case study 4
When I think of human rights, I think of opportunity. 
For me, rights are the construct which ensures protections people need are at the heart
of society, from government to beyond. 
This means we should have the chance to pursue a better society, at least in theory,
without leaving anyone out. But this isn’t how I’ve always seen human rights! 
My first introduction (to my memory, anyway) was in early High School. I remember
being told about them around my rights and responsibilities as a UK citizen. Yet, while
I learned about rights, I am not sure I truly understood them. 
Bringing rights to life - My first real dip into the world of human rights didn’t happen till
much later. It started with the ‘Future Fridays’ programme in North Lanarkshire, where
secondary school students can spend Friday afternoons doing activities like taking a
college course or gaining work experience.   
Page 76 of 167

Page 77

Through this, I joined the Make It Right project, working on a communications campaign
to raise awareness of children’s rights and mark the expected incorporation of the
United Nations Convention of the Rights of the Child, into Scots Law. 
While the incorporation was delayed, thankfully the campaign was not. Each advert,
poster and key message was jointly created by young people and adults, making it a
rather unique piece of co-production and place to learn. 
Making a difference - Since then, I’ve continued my work on human rights by joining
Scotland’s National Action Plan for Human Rights (SNAP) Leadership Panel. At 17
years old, I’m the Panel’s youngest member, and it’s truly been a whirlwind adventure,
working on all sorts, from mental health to education and beyond. 
It wasn’t until I joined the Leadership Panel that I truly gained an understanding of what
human rights are and what they mean to me. 
I still remember the early barrage of documents and inaccessible language – on a page
filled with acronyms, from the basic SG (Scottish Government) to the unexplained
NACWG (National Advisory Council for Women and Girls), it made no sense! 
Luckily for me, I had the help of fellow panel members and the awesome SNAP
Secretariat Lead to guide me, something I have talked about on the SNAP website. 
I do wonder how it would’ve turned out for someone without access to the right support.
For example, I’m a student who doesn’t need to work, so I can afford to spend a day in
a meeting. Even simple things like shortening meeting lengths can make participation
more realistic for many.   
Not everything is rosy - Working with human rights is not all positive. There simply
hasn’t been enough resourcing over the last decade to support civil society. This has
undoubtedly impacted on organisations’ ability to contribute to exciting things like
SNAP. 
The delays to legislative changes that would allow people to access to their rights, such
as the new Scottish Human Rights Bill, have understandably demoralised those who
most need the protections. And at a UK-level, the Government’s attempt to repeal the
Human Rights Act could even see the UK ‘in breach of its international obligations’
should it become law, according to human rights campaigners. 
So, as I said at the beginning, human rights are an opportunity – but one that often falls
short. Our inalienable rights let us dream of a better world though. And in tough times,
they strengthen our ability to defend them, against people who would prefer to make
rights history. 
In 2022, I think Scotland is doing fine on human rights, regardless of all the rhetoric
saying we are amazing or terrible. On the ground, the truth is much more mundane –
there’s a lot to be proud of yet so much more to do! 
Page 77 of 167

Page 78

Page 78 of 167

Page 79

North Lanarkshire Council
Report
Education, Children and Families Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  AG/MF Date 23/05/23 
Embedding the United Nations Convention on the Rights of the
Child (UNCRC) 
From  Alison Gordon, Chief Social Work Officer (Education and Families, Justice
and Integrated Practice)  
E-mail gordonal@northlan.gov.uk Telephone 01698 332001 
Executive Summary 
On 16th March 2021 the United Nations Convention on the Rights of the Child
(Incorporation)(Scotland) Bill passed the final stage within the Scottish Parliament with
unanimous support.  Although implementation of the legislation has subsequently been
delayed by a referral to the Supreme Court and required amendment to ensure all
associate provisions sit within the competence of the Scottish Parliament, associated
practice, policy and system change has continued to be foundational to developments
within children’s services and beyond including the Promise’ s transformation programme
and reporting requirements on UNCRC are already embedded within national children’s
services planning requirements. 
This report advises on ongoing activity and developments to promote UNCRC and
embed this in practice and systems within North Lanarkshire.  This is not only to ensure
the Council can meet current and future obligations and duties with respect to UNCRC
but because this is critical to our ambition to ‘support all children and young people to
realise their full potential’ and to the approach to the new Resilient People programme of
work which supports the plan for North Lanarkshire. 
Whilst much of the activity reflected in this report has been led within the Education and
Families Service, obligations and duties with respect to UNCRC sit with the council as a
whole and thus also with elected members. The report therefore also addresses the role
of elected members in supporting, scrutinising, and realising children’s rights in North
Lanarkshire. 
Recommendations
It is recommended that Education, Children and Families Committee: 
(1) Note the content of this report.
(2) Approve the actions set out as Next Steps in section 2.13 of this report. 
The Plan for North Lanarkshire
Priority  Support all children and young people to realise their full potential
Ambition statement (7) Enhance collaborative working to maximise support and ensure
all our children and young people are included, supported, and safe
AGENDA ITEM 7
Page 79 of 167

Page 80

1. Background 
1.1 The United Nations Convention on the Rights of the Child (UNCRC) is considered the
global ‘gold standard’ for children’s rights, and was ratified by the UK in 1991 and
therefore already provides a framework for the consideration of children’s rights.  In
Scotland this is reflected in the national approach for supporting children, Getting it
Right for every Child (GIRFEC) and in areas of existing legislation notably the
Children and Young People (Scotland) Act 2014.  The UNCRC (Incorporation)
(Scotland) Bill passed by the Scottish Parliament in March 2021 heralds however a
significant step change in the commitment to children’s rights by seeking to directly
incorporate the UNCRC into domestic law, taking a maximalist approach as far as this
is compatible with the powers of the Scottish Parliament. 
1.2 It was anticipated that this new legislation be enacted in October 2021, within 6
months of gaining royal assent, however the timetable has been impacted by a
referral to the Supreme Court by the UK government who consider that some specific
provisions within the Bill may encroach on reserved matters.  This position was
upheld by a supreme court judgement in October 2021.  It remains however the
intention of Scottish Government to incorporate the UNCRC into Scots Law as far as
this is possible within devolved competence as soon as is practicable and
preparations continue to return the Bill to the Scottish Parliament to address these
issues.  In the interim a significant programme of work continues at national level to
support implementation and full realisation of children’s rights by public authorities as
outlined at 1.6 below.   
1.3 The Bill which received unanimous cross-party support is intended to promote and
ensure compliance with the rights of children under 18 in decisions, actions (and
inactions), and makes these rights enforceable through the courts.  Specifically, it
intends to:
• make it unlawful for public authorities to act incompatibly with the incorporated
UNCRC requirements.
• give power to the Children and Young People’s Commissioner to take legal
action if children’s rights under the UNCRC are breached. 
• require Ministers to produce a Children’s Rights Scheme and to review this
annually.
• require listed public authorities (including councils) to report every three years
on what they have done to meet the UNCRC requirements, building on the
existing duties of the Children and Young People (Scotland) Act 2014. 
1.4 Whilst the UNCRC includes 42 wide ranging substantive articles, there are 4 general
principles, critical to implementation:
• apply rights without discrimination (Article 2)
• best interests of the child to be a primary consideration (Article 3)
• right to life, survival and development (Article 6)
• right to express a view and have that view taken into account (Article 12) 
1.5 The commitment to UNCRC and the promotion of children’s rights is   
fundamentally interwoven with the delivery of the Promise, to which full Council 
pledged its commitment in August 2020 and the Promise Plan 21-24 published in
March 2021 and is embodied in the ‘foundation’ of ‘voice’ and the ‘fundamentals’ of
‘what matters to children and families’, ‘listening’, ‘poverty’, ‘children’s rights’ and
‘language’.  The most recent planning guidance for Children’s Services Partnerships
also places significant emphasis on UNCRC. 
Page 80 of 167

Page 81

1.6 The Scottish Government has made available a range of resources to support public
bodies progress the culture, systems and practice changes required to deliver on
children’s rights in Scotland.  These include Introductory Guidance; a 20 minute
training resource; Advice and Guidance on enabling children and young people’s
participation in decision-making and the establishment of a Children’s Rights
Knowledge Hub. In addition, work continues on a Skills and Knowledge Framework,
Statutory Guidance and a capacity building programme with an Innovation Fund due
to launch in late spring to promote creative approaches to embedding children’s
rights. 
1.7 At a local level as detailed below embedding of children’s rights is a thread running
through a range of improvement activity and is aligned with current and future
programmes of work.  The Corporate Management Team (CMT) in considering the
implications of prospective legislation and the benefits of a rights-based approach in
2021 endorsed this work and in particular proposals to move towards adoption of
Children’s Rights and Wellbeing Impact Assessments (CRWIAs) to support key
decision-making.  In recognition of the need to promote awareness and ownership of
children’s rights across all council services.  UNCRC was also the focus of session of
the Council’s full operational management team in November 2022. 
2. Report 
Progressing Children’s Rights in North Lanarkshire 
2.1 Over recent years work within Children’s Services in North Lanarkshire has had
increasing focus on involvement and participation and embedding children’s rights in
our processes and delivery of services.  Whilst Community Learning and
Development colleagues have been key to much of this work, this is now much more
integrated across the full Children’s Service Partnership. 
2.2 In 2018 the Children’s Services Partnership and young people worked together to
develop a ‘Partnership Agreement’ marking the intention of moving away from
episodic consultation with children and young people to a framework to support
meaningful engagement and participation, built around 7 golden rules developed
though the Children’s Commissioner’s office:  understanding my rights; a chance to
be involved; remember it’s my choice; value me; support me; work together, keep in
touch. 
2.3 Further to this work the Children’s Services Partnership also made changes to its
structures and arrangements with, from 2019, young people being directly
represented on the Children’s Services Partnership Board via North Lanarkshire
Youth Council and Partnership Board representatives also committing to attending
wider Youth Council meetings.  Today Not Tomorrow, representing Care Experienced
Young People, are also linked into these arrangements and from early 2020 the
Children’s Champions Board has also provided a forum for this group to engage with
Senior Leaders.  More recently the Voice Task Group has been established with a
remit to ensure ‘voice’ is embedded in all service development and improvement
activity within the partnership, whilst the small team of Promise Development Workers
created in 2021 have had a critical role in ensuring developments are informed by
lived experience and in challenging stigma. 
2.4 Multiple strands of work are being progressed to ensure all children and young people
have the opportunity to be heard and involved in decisions which impact on their
lives.  This ranges from involvement in service development to the use of tools such
as the MOMO (Mind of my Own) app to support young people express their views.  A
key element of support is also the provision of advocacy to support young people
Page 81 of 167

Page 82

involved in child protection, experiencing care or with additional support needs
including mental health issues.  Historically commissioned through social work there
has been an increased demand also for advocacy for education matters. 
Whilst significant progress has been made there however remains much work to be
done to address some of the barriers children and young people experience and to
make the system changes required to ensure voice and children’s rights are fully
embedded in our service and policy development and delivery. 
2.5 In November 2020, to support the development of the current Children’s Services
Plan (2021-2023), North Lanarkshire Youth Council led a survey of local children and
young people to gather views about UNCRC, awareness of children’s rights and
which rights children and young people felt were most important.  This was issued via
various networks and channels and led to over 400 responses which identified gaps
in awareness amongst young people and with respect to how they felt adults
understood their rights.  A key and innovative area of work progressed in response to
this was the awareness raising Make it Right campaign Children's Rights | North
Lanarkshire Council   produced and led by a mixed group of young people involved in
Future Fridays supported by staff from corporate communications and education and
families.  The campaign which was launched in February 2022 used a range of media
to promote awareness of children’s rights and has gained recognition nationally as an
example of good practice including by the Children’s Commissioner and a
representative on the UN Committee on Children Rights. 
2.6 Awareness amongst children and young people in North Lanarkshire is also
supported by a strong commitment to the Rights Respecting Schools Programme. 
National funding for this programme supported by UNICEF across all state primary
and secondary schools was confirmed in May 2022.  As of March 2023, 123 schools
in North Lanarkshire had gained a Rights Respecting Schools Award, 17 of these at
Gold level. 
2.7 Other key actions and system changes to support the realisation of children’s rights in
North Lanarkshire have focussed on the further enhancement of participation with the
Youth Participation Wheel approved by Education, Children and Families Committee
in August 2022, see diagram below.  A key strand of this has been the establishment
of the Future NL forum which provides an opportunity for a number of elected
members to come together with Youth Council and Youth Voice group
representatives and support staff to discuss areas identified as priorities by young
people. 
Page 82 of 167

Page 83

Children’s Rights and Wellbeing Impact Assessments 
2.8 A Children’s Rights and Wellbeing Impact Assessment (CRWIA) is designed to
support assess the potential impact of any policy/measure on children’s rights and
wellbeing.  It covers all children and young people under 18 and has been developed
as an improvement approach, tool and published output, following a similar
framework to an Equality Impact Assessment.  Guidance and a template for CRWIAs
was published by the Scottish Government in March 2019.  These were originally
developed to support Ministerial Duties under Part 1 of the Children and Young
People (Scotland) Act 2014 but are also intended for use by other public bodies and
children’s services.  Whilst use outside of government has not been mandatory over
this period, CRWIAs are a useful tool in ensuring that children’s interests and rights
are championed and going forward will be an essential vehicle to support and
evidence compliance with the new legislation. 
2.9 It is important to highlight that CRWIAs are relevant to all new policies and
measures which may impact on children and not only to developments within
children’s services.  They are framed not only around the UNCRC considerations
but also around the GIRFEC wellbeing indicators (Safe, Healthy, Achieving, Nurtured,
Respected, Responsible, Included), recognising the intrinsic links between these. 
The process followed is in line with EQIA practice with an initial Stage 1 Screening to
identify relevant aspects, likely impact and which groups of children or young people
may be impacted, with the scope and potential consequences as well as impact on
those most vulnerable used to support a proportionate decision on the need for
undertake a Stage 2 Assessment.    Should this be required there is a need to
consider all relevant articles on the UNCRC and supporting protocols, the impact on
children’s rights and wellbeing, the evidence base including stakeholder consultation
and the involvement of children and young people in the assessment.  
Page 83 of 167

Page 84

2.10 To date North Lanarkshire Council has not systematically used CRWIAs, although a
CRWIA was undertaken in respect of our current Children’s Services Plan, and these
have been tested to support a small number of reports.  Following this and
development work involving Education and Families and Chief Executives, including
legal services it is now planned to incorporate these into the standard reporting
template for the Senior and Corporate Management Teams and for Committee
reports.  The adoption of this measure in advance of a statutory requirement is a key
step and signal of intent and commitment on the journey to fully realise children’s
rights in North Lanarkshire. 
Role of Elected Members 
2.11 The Improvement Service has developed a web-based resource to support elected
members understand UNCRC and their role in the realisation of children’s rights and
ensuring the relevant duties of the local authority in this regard are met. Understanding
Children's Human Rights (arcgis.com). This highlights the importance of hearing
children’s views within political and decision-making processes and that many
changes in society have a disproportionate and often negative impact on our children. 
It suggests the importance of Elected Member’s in:  
• Championing children’s rights
• Remembering that these are a relevant consideration in all areas of business
which may impact, not only in children’s service, for example in areas such as
housing, transport and tackling poverty.
• Creating opportunities to listen to children and young people withing their
communities.
• Understanding their legal obligations to protect rights and to take action where
these are abused.
• Considering and prioritising children’s rights within council and partnership
planning including in budget decisions. 
2.12 Whilst it is important, as highlighted above, that children’s rights are considered within 
all areas of council business, the Education, Children and Families Committee will  
clearly have a key role and visibility on this as it is anticipated that moving forward a
significant proportion of reports to this committee will reference CRWIAs to support
decision-making.  Elected Members participating in some of the key structures
referenced above including the Children’ s Services Partnership, Children’s
Champions Board and Future NL will also have additional opportunities to support
and scrutinise the delivery of children’s rights in North Lanarkshire.  
Next Steps 
2.13 As is clear from the information set out action to realise children’s rights through best 
practice, culture and system change will continue to be integrated across a range of 
improvement activity.  It is planned however that key actions at this point include: 
• The introduction of CRWIAs into the standard report format for all reports to
council committees from Committee Cycle 3 of this year.
• Development of staff and member training inputs on UNCRC, drawing on
national resources as appropriate.
• Continued support for the roll out of the Rights Respecting Schools Award
across all North Lanarkshire Schools.
• Completion of the requirement to report on the delivery of children’s rights in
North Lanarkshire over the period April 2020-March 2023 by June 2025 in
line with Children’s Service Planning requirements.
Page 84 of 167

Page 85

• Further engagement with young people involved in the Make it Right
campaign to inform next phase.
• Consideration of a bid to the Innovation Fund to support a defined area of
work to progress children’s rights.   
3. Measures of success 
3.1  Improved awareness of UNCRC and Children’s Rights.
3.2 The council is well prepared to meet its legal duties under new legislation.
3.3 Number of CRWIAs completed.
3.4 External and internal evaluation and feedback from children and young people
demonstrate progress towards fully realising children’s rights.     
4. Supporting documentation 
4.1 UNCRC Introductory Guidance 
Children's Rights and the UNCRC in Scotland: An Introduction (www.gov.scot) 
Alison Gordon
Chief Social Work Officer
(Children, Families, Justice & Integrated Practice) 
Page 85 of 167

Page 86

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The introduction of CRWIAs will complement these existing impact assessments 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Activity reflected in the report supports the council in its current legislative duties
and the introduction of CRWIAs will support also meet new duties associated with
the new legislation when implemented. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
Page 86 of 167

Page 87

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Work to evaluate and build on the successful Make it Right campaign will be
undertaken in consultation and collaboration with the corporate communications
team 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Adopting CRWIAs in advance of new legislation/statutory guidance carries some
risk that further adaptation may be required at a future date however this is
outweighed by the benefits of these in supporting the council in its existing duties
and in its readiness for the new legislation.  Using these as a vehicle to progress
children’s rights in North Lanarkshire both supports the council in its own key
ambitions and reduces future vulnerability to potential actions for non-compliance. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 87 of 167

Page 88

Page 88 of 167

Page 89

North Lanarkshire Council
Report
Education, Children and Families Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref  Date 23/05/23 
P047.1: Town and community hub delivery programme – (1)
Update on progress of the hub development and delivery
programme. 
From  James McKinstry, Chief Officer (Assets and Procurement)  
Email  McBrideM@northlan.gov.uk 
McCabeC@northlan.gov.uk 
Telephone Mark McBride, Estates
Development Manager,
07583 094928 
Charles McCabe, Hub
Strategy Manager, 07946
353323 
Executive Summary 
This report provides an update of the Town and Community Hub Delivery Programme,
highlighting the status of each project. 
This information is provided in line with The Plan for North Lanarkshire and the associated
Programme of Works.   
Recommendations 
It is recommended that the Education, Children and Families Committee recognise: 
1) the position of each of the projects in the current Town and Community Hub
Delivery Programme 
The Plan for North Lanarkshire
Priority  Support all children and young people to realise their full potential
Ambition statement (24) Review and design services around people, communities, and
shared resources
AGENDA ITEM 8
Page 89 of 167

Page 90

1. Background 
1.1 Policy and Strategy Committee approved the strategy, guiding principles, and
prioritisation matrix linked to the Town and Community Hub Programme at the meeting
held on 19th March 2020.   
1.2 Updates regarding this programme are progressed through two strands:  activity related
to the strategy is progressed via the Policy and Strategy Committee; and activity related
to hub delivery projects is progressed via Education, Children and Families Committee.   
1.3 Projects within the Town and Community Hub programme are delivered in line with the
available capital budget assigned to this programme.  The Council’s capital plan is
generally reviewed and updated in five-year cycles.  As such, the prioritisation and
delivery of projects within the Town and Community Hub Programme are reviewed and
aligned each time the wider capital programme is assessed, and funds allocated. 
1.4 The Town and Community Hub programme must be managed within the funding
allocation provided.  Therefore, where costs or projects increase, the number of
projects which can be delivered may need to be deferred, or alternatively, where
efficiencies can be realised, additional projects may be brought forward. 
1.5 As with many of the council’s strategic programmes of work, the Town and Community
Hub programme has a programme board, consisting mainly of chief officers, who
provide governance at officer level on this programme of work.  As and when required,
decisions or options are and will continue to be reported to the relevant council
committees. 
2. Report 
Town and Community Hubs – Current Delivery Programme 
2.1 Appendices 1 and 2 to this report provide details of all projects in the current Town and
Community Hub delivery programme. 
2.2 Appendix 1 provides both a progress summary briefing and a programme timeline chart
of projects in the scoping stage, procurement or construction.  Appendix 2 provides
details of projects which have been approved but are currently at pre-delivery stage. 
2.3 Each project under construction will have an agreed set of key performance targets
with a number of these providing added benefits to our communities. Appendix 3
provides an update of community benefit achievements across both Hub construction
projects and DBFM facilities. 
2.4 Whilst each project has its own unique characteristics, Appendix 4 to this report
provides an indication of some of the important milestones in delivery of a new hub
facility.  As projects develop, indicative dates for delivery milestones can be
communicated.  This will be subject to continuous review and reported in future updates
to Education, Children and Families Committee as required. 
Shared Ambition – Integrated Community hubs/campuses 
2.5 In March 2020, at the Policy and Strategy Committee, members approved the ‘One
Place – One Plan’ report including recommendations linked to the Town and
Community Hub Programme.  
Page 90 of 167

Page 91

2.6 Specifically, members approved two key aspects: 
2.6.1 That a set of guiding principles be adopted and used to further develop the design
proposals for Town and Community Hubs; and 
2.6.2 That a prioritisation matrix to be used as the methodology to determine the priority order
for Town and Community Hubs development. 
Guiding Principles 
2.7 The guiding principles adopted to inform this programme are designed to ensure each
project delivers facilities through which new ways of working can be promoted.  These
guiding principles primarily address the planning and build aspect of this programme
(i.e. the zones that will be provided).  The operating model, developed by colleagues in
Education and Families, will guide and promote the added value through co-location of
services and multi-use of facilities within each hub delivered. 
2.8 The six approved guiding principles are included in all updates to committee to ensure
that committee members can assess the projects are being developed in line with these
principles.  The six principles are: 
2.8.1 Principle One: Inclusive, universal provision 
A community hub must serve the whole community and offer universal provision of
services as default position.  Where more targeted service provision is required, this
should be delivered in such a way as to avoid stigma of accessing these services which
may otherwise reduce uptake. 
2.8.2 Principle Two: Sense of community ownership 
A community hub is a community asset which serves the local community of that area. 
Central to the community hub model in North Lanarkshire is the learning and teaching
facilities offered.  However, the wider community must perceive the asset to be a whole
community asset. 
2.8.3 Principle Three: Maximum availability and usage 
Community hubs will be accessible from early in the morning until late in the evening
and all spaces within the community hubs should afford multi-functional use for the
whole community.  Facilities should only be provided where it can be demonstrated that
they would be used both through the day and in the evening – no facilities should be
provided where they are only for use in the evening. 
2.8.4 Principle Four: Designed with rather than for the community 
Options of proposals should be provided to local communities for discussions as early
as possible to ensure community ownership of the proposed facilities. 
2.8.5 Principle Five: Tailored, bespoke, representative 
Each community hub has the option to be unique to ensure it meets the specific
requirements of the community which it will serve.  The design of the building should
provide the community with a sense of pride in the community asset that has been
created.
Page 91 of 167

Page 92

2.8.6 Principle Six: Maximise the services on offer 
Public services available within the community hub should complement rather than
compete with other services which serve the same local community. 
Prioritisation Matrix 
2.9 Following approval at the Policy and Strategy meeting in March 2020, work on the
prioritisation matrix was progressed.  This work includes determining how each
individual project can be scored, and therefore compared, to other potential projects. 
A further update was provided to Policy and Strategy Committee in September 2021
within “The Place, The Vision – Update”.  Specifically, the list of schools which will be
focus for initial feasibility, was outlined within Appendix Three, within the September
2021 update to Policy and Strategy. 
2.10 This list was compiled with an initial focus on the highest weighing factor in the matrix
– that of ‘socio-economic and wellbeing’.  Two assessments were made against each
pre-1996 catchment area: deprivation (using SIMD) and population density (using
SAPE).  Further information on this process was outlined in section 2.15 of the report
presented to Policy and Strategy on 30th September 2021. 
2.11 The current capital programme includes projects up to the year 2026. Further work will
be carried out on the list of potential projects, to further refine the list, using the other
five prioritisation inputs as funding becomes available for future tranches of the
programme.  This will continue to be an iterative process until there is a clear
recommendation on the next phase of projects.  These will be presented to committee
at a future meeting. 
Existing projects 
2.12 Projects already in the programme for delivery, which have been included in previous
updates of this report to Education and Families Committee, have (where achievable)
been subject to assessment against the guiding principles and will (where achievable)
ensure adhesion to the principles.  The appendices included within this report reflect
progress in this regard. 
Learning Estate Investment Programme (LEIP) 
2.13 Members of this committee may recall that, following discussion and approval at Policy
and Strategy Committee of 29th September 2022, the council submitted a proposal for
LEIP phase three funding.  As agreed by Policy and Strategy Committee, the council
submitted an application for funding for: 
• an extension at Chryston High School – required to mitigate the impact of
significant housebuilding across the Northern Corridor area.
• a contribution towards Gartcosh Primary School – a new 434 space primary
school, new ASN provision, and new Early Years provision to serve this
growing population. 
2.14 It was anticipated that the Scottish Government would announce the projects which will
be approved for funding, under phase three of this programme, by the end of the current
calendar year (December 2022).  The Scottish Government has not yet announced the
funding for LEIP phase three. 
Page 92 of 167

Page 93

Inflationary pressures 
2.15 Members of this committee are advised that reports have been submitted to other
relevant committees on the inflationary pressures affecting this and other programmes
of work linked to the council’s capital programme. 
2.16 The construction industry is continuing to face challenges as a result of market volatility
and a constantly shifting economic landscape. The expectation is that material prices
could stabilise in 2023 however, labour costs may continue to increase throughout
2023 and 2024 which will result in costs remaining high and unstable for the
foreseeable future. Due to ongoing economic turbulence a higher than normal number
of contractor insolvencies are being seen resulting in less contractors that can tender
for work, which is also contributing to costs remaining high for now. 
2.17 There is likely to be an ongoing impact on the budget for the Town & Community Hub
Programme. Due to the level of uncertainty in the industry, it is difficult to fully assess
the impact inflation may have on the remainder of the programme. The inflation
allowances within the programme budget for the remaining projects have been
increased to reflect current market indications and these will be subject to ongoing
review. 
3. Measures of success 
3.1  Delivery of projects in line with the guiding principles linked to this programme of work,
which in turn are designed to deliver against the strategic priorities within The Plan for
North Lanarkshire.   
4. Supporting documentation 
Appendix 1a: Hub Delivery Programme – Current Delivery Programme. 
Appendix 1b: Hub Delivery Programme – Programme Timeline Chart. 
Appendix 2: Hub Delivery Programme – Phase 3 Pre Delivery Projects. 
Appendix 3: Hub Delivery Programme – Community Benefits Programme Outputs. 
Appendix 4: Hub Delivery Programme – Programme Timeline Chart. 
James McKinstry
Chief Officer (Assets and Procurement) 
Page 93 of 167

Page 94

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☒
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Significant inflationary pressures and other external factors continue to have an
impact on this programme and other capital budgets across the council – these
have been subject to separate reporting to Policy and Strategy Committee. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Page 94 of 167

Page 95

Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
All new assets (New builds) have data connection requirements – these are part of
the overall process and involve relevant stakeholders including the digital teams, to
ensure infrastructure such as data connections/Wi-Fi etc., are planned as part of
the build process. 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
The environmental and carbon impact on any given project is assessed as part of
the project from the outset – with a determination to reduce carbon footprint as
much as possible within each project delivered. 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact
Is there a risk impact?
Yes ☐ No ☒
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
5.10  Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 95 of 167

Page 96

Appendix 1 Hub delivery programme – Current delivery programme      Updated: March 2023
Appendix 1a: Progress Summary 
Project Contract Stage Contract Construction
Programme dates
Key Activities in period / planned next 
Phase 3 (current procurement phase) 
Newmains and St Brigid’s
Community Hub
Construction
(Tier 1
contractor -
Bam
Construction)
Handed Over –
February 2023
Newmains and St Brigid’s Community Hub opened in February 2023.  This
community hub is now operational and will be removed from future hub
programme updates to Education, Children and Families Committee.
Chryston Community Hub
Northern Corridor
Construction
(Tier 1
contractor -
Robertson
Construction)
Projected handover –
September 2023
Construction works suffered over the last period because of the cold
weather freeze over the Christmas period which affected wet trades i.e.,
Bricklayers, Screeding etc, resulting in a delay to progress on site. At this
point, the tier 1 contractor has advised that it is unlikely that the slippage
cab be recovered.  As such, the proposed handover date has moved to
September 2023.   
Riverbank Community Hub
Coatbridge 
Construction
(Tier 1
contractor –
Morgan Sindall
Construction)
Projected handover –
August 2023
Construction works are progressing well. Active travel links between the
new hub and the surrounding areas are being progressed including a new
pedestrian bridge at Carnbroe, enabling works for the new bridge have
now commenced.  Decant meetings, which help transition the existing
school community to the new build have commenced.   
St Kevin’s Community Hub
Coatbridge
Preconstruction
– Stage 1 (Tier
1 contractor -
Kier
Construction)
Start on site Q3 2023 Kier Construction and their design team are progressing the project
through stage 2 activities in advance of formal stage 2 submission in the
summer. Stage 2 activities include Market testing, detailed design and
submission of a planning application.
Page 96 of 167

Page 97

Project Contract Stage Contract Construction
Programme dates
Key Activities in period / planned next 
Orbiston Community Hub
Bellshill
Preconstruction
– Stage 2 (Tier
1 contractor
Morgan Sindall
Construction)
Stage 2 submission
anticipated Q3 2023.
The updated stage 1 report was recently approved by the Town &
Community programme board allowing stage 2 activities to commence. A
planning application was submitted on the 24th of March. Enabling works
to separate the existing school facilities from the construction works will be
carried out during the summer holidays in advance of the schools returning
for the 2023/24 academic year. 
St Stephen’s Community Hub
Coatbridge
Preconstruction
– Stage 1 (Tier
1 contractor
Morrisons
Construction)
Start on site anticipated
spring 2024
Hub South West and the Tier 1 contractor are currently progressing stage
1 activities including topographical surveys and site investigation works. A
stage 1 submission is anticipated in Q2 2023 with the main construction
works anticipated to commence on site in the spring of 2024.
Chryston High School
Extension
Northern Corridor
Tender award Stage 1 submission Q3
2024
Following a competitive tender process, Hub South West are in the
process of appointing a Tier 1 contractor (and design team) to deliver the
project.
Gartcosh Community Hub
Northern Corridor
Tender Stage Tier 1 appointment May
2023
Hub South West have recently commenced the contractor/Design team
tender process for the new Gartcosh Community Hub. A Tier 1 contractor
(and design team) appointment is anticipated in May 2023. 
Education, Childen & Families Service have commenced the Statutory
Education Consultation process. 
Page 97 of 167

Page 98

Appendix 1 Hub Delivery Programme – Current Delivery Programme:  Appendix 1b: Programme Timeline Chart – Oct 2022
Page 98 of 167

Page 99

Appendix 2: Hub Delivery Programme:  Pre-delivery projects
Project Description Status
Ravenscraig Community Hub: Incorporating
two new primary schools within Ravenscraig
(Motherwell)
The location for this project is still under review.  There is approved statutory education consultation for
the site at the north of Ravenscraig (Carfin end). Project not now projected to be taken forward until next
capital programme. 
Abronhill Community Hub This project has been deferred, as reported to the Policy and Strategy Committee on 16th March 2023. 
This project is not now projected to be taken forward until the next capital programme. 
Page 99 of 167

Page 100

NORTH LANARKSHIRE COUNCIL - HUB DELIVERY TEAM  Appendix 3
KPI - BENEFIT TRACKER  
DETAILS AS AT: March 2023   
KPI
REFERENCE KPI DESCRIPTION
TOTAL
COMMITMENT
TOTAL
ACHIEVED TO
DATE
7.1 CONSIDERATION CONSTRUCTORS SCORE 110 124
7.2 NO. OF COMMUNITY DESIGN PRESENTATIONS 6 12
7.3 ANNUAL COMMUNITY BENEFIT DAYS (ACTIVITIES) 9 17
8.1a SKILLS ACADEMY - GRADUATES RECRUITED 3 2
8.1b SKILLS ACADEMY -  APPRENTICE STARTS 18 15
8.1c SKILLS ACADEMY - APPRENTICE COMPLETIONS 9 6
8.1d
SKILLS ACADEMY - LOCAL ADVERTISEMENT OF JOBS (JOBS
CREATED OTHER THAN GRADUATES OR APPRENTICES) 12 7
8.1e SKILLS ACADEMY - WORK EXPERIENCE/PLACEMENT (14+) 51 26
8.1f SKILLS ACADEMY - EXISTING APPRENTICES 15 20
8.1g
SKILLS ACADEMY - OVERALL DELIVERY OF PROJECT
OUTCOMES
AVERAGE
ACROSS ALL CBA
2017 RELATED
TARGETS FOR
HUBSW
COMPLETED
PROJECTS 01
8.1h
SKILLS ACADEMY - TRAINING EVENTS DELIVERED
(QUALIFYING THE WORKFORCE) 47 33
8.1i/j
SKILLS ACADEMY - EDUCATIONAL ACTIVITY - SMEs AND
TEACHING STAFF 21 48
8.1k SKILLS ACADEMY - SOCIAL IMPACT EVENT OR CONTRIBUTION
1 PROJECT PER
ANNUM, HUB
WIDE, ALL TIER
1s. PROPOSAL
TO COME FROM
TIER 1s 2
8.2a
COMPANIES INVOLVED WITH LOCAL EMPLOYMENT AND
TRAINING PROJECTS 15 5
8.2b
SUPPLY CHAIN INSTITUTE - CONTRACT OPPORTUNITIES FOR
TERRITORY BASED CONTRACTORS (%) 70%
Riverbank
50.43%
Chryston 40.7%
Newmains & St
Brigid’s 75%
8.2c
SUPPLY CHAIN INSTITUTE - LOCAL SUPPLY CHAIN EVENTS TO
ENGAGE LOCAL COMPANIES 30 35 
8.2d
SUPPLY CHAIN INSTITUTE - LOCAL COMPANIES GIVEN
PRICING/TENDERING OPPORTUNITIES FOR FIRST TIME BY
TIER 1 OR M&E CONTRACTORS 15 44
Page 100 of 167

Page 101

KPI
REFERENCE KPI DESCRIPTION
TOTAL
COMMITMENT
TOTAL
ACHIEVED TO
DATE
8.2e
SUPPLY CHAIN INSTITUTE - LOCAL COMPANIES GRADUATED
FROM THE BUILDING FOR GROWTH PROGRAMME
HUB TARGET TO
GET 12
GRADUATE
COMPANIES
EACH
REPORTING
YEAR 25
8.2f
SUPPLY CHAIN INSTITUTE - LOCAL BUSINESS IMPROVEMENT
SUPPORT AND WORKSHOPS 30 54
8.2g
SUPPLY CHAIN INSTITUTE - BUSINESS EXPANSION SUPPORT
AND WORKSHOPS 30 43 
8.2h
SUPPLY CHAIN INSTITUTE - CONSTRUCTION SPECIFIC
LEARNING EVENTS AND WORKSHOPS 60 57
8.2i
SUPPLY CHAIN INSTITUTE - THIRD SECTOR BUSINESSES -
HUBSW PROJECTS CONTRACTS AWARDS/OPPORTUNITIES
TARGET OF 10
OPPORTUNITIES
ACROSS ALL
PROJECTS PER
ANNUM - ALL
TIER 1s 2 
1 It should be noted that the identified indicators are expected to be ‘zero’ in relation to ‘total achieved to date’ at this
time.   
If you would like more detailed information on any of the projects, please contact Pamela Ross (email address:
RossP@northlan.gov.uk) 
Page 101 of 167

Page 102

Appendix 3 (continued) – definitions for KPIs outlined in section above 
KPI  REF KPI DEFINITION KPI ACHIEVEMENT Arrangements & Delivery 
7.1 Consideration Constructors Score Tier 1 Contractors to implement the
Considerate Contractors Scheme for
Construction Contractor and reach a
minimum score of 35 on each project
Tier 1 Contractors to implement the Considerate Contractors
Scheme for Construction Contractor 
7.2 Number of Community Design
Presentation
Presentation events engaging with the
local community to present and consult
on proposed design plans
Engage with the Local Authorities, local community groups,
professional service provider.  Includes any community design
presentations which may have taken place before tier 1
appointment and gather evidence. 
7.3 Annual Community Benefit Days
(Activities)
One off events, activities, or
sponsorships which have an effect on
certain local communities, organisations
or institutions
Engage with local community groups / organisations and identify
potential activities, these may be for example sponsorship of local
football team, scout hut roof replacement, community garden
projects, support local charities, etc.
8.1a Skills Academy - Graduates
Recruited
University - Graduate/Post Graduate as
follows:  Graduated within last 3 years.
Employed Main Contractors, Sub-
Contractor or Professional Services
provider.  
Identify opportunities, within and with sub-contractors, Professional
services providers. Meeting between tier1 and sub-
contractor/supplier, and vehicles such as hub SW Recruitment and
Training Advisory Days
8.1b Skills Academy - Apprentice
Starts               
New entrant apprenticeship, new
entrant trainees and new entrant
technical/higher level qualifications, on
a formal apprenticeship framework in
Level 2 or above N/SVQ. e.g. new start
apprentices employed on project by
Main Contractors, Sub-Contractor or
Professional Services provider. 
Identify opportunities, within and with sub-contractors, Professional
services providers. Meeting between tier1 and sub-
contractor/supplier, and vehicles such as hub SW Recruitment and
Training Advisory Days. Potential candidates can be identified
through engagement with schools and colleges. 
Page 102 of 167

Page 103

Appendix 3 (continued) – definitions for KPIs outlined in section above
KPI  REF KPI DEFINITION KPI ACHIEVEMENT Arrangements & Delivery 
8.1c Skills Academy - Apprentice
Completions
Apprentice who will complete their
formal apprenticeship programme
whilst employed on project by tier 1
Contractors, Sub-Contractor or
Professional Services provider.  
Identify within and with Sub-Contractors, Professional Services
providers through tier 1 meetings, hub SW Training and Recruitment
Advisory Days, any existing or redundant/displaced apprentices who
will complete their apprenticeship whilst working on the project.
(tier 1 contractor can elect to designate an Apprentice completer as
an existing Apprentice instead if they wish to do so)                                   
8.1d Skills Academy - Local
Advertisement of Jobs  (Jobs
created other than graduates or
Apprentices)
Creation of a new and sustainable job
with 12 weeks minimum continued
employment. Job opportunities to be
advertised locally through Job Centre
Plus or local organisations such as  CEIS,
TAP, Routes to Work, Local Authorities
Economic Development Teams or other
Local Training Employment Initiatives.
to be employed on project by Main
Contractor, Sub-Contractor or
Professional Services provider. 
Identify within and with Sub-Contractors, Professional Services
providers through tier 1 meetings, hub SW Training and Recruitment
Advisory Days. include pre-construction meetings engage with local
Job Centre Plus, CEIS, Ingeus, Routes to Work, Local Authorities
Economic Development Teams, other local training employment
Initiatives. 
Page 103 of 167

Page 104

Appendix 3 (continued) – definitions for KPIs outlined in section above
KPI  REF KPI DEFINITION KPI ACHIEVEMENT Arrangements & Delivery 
8.1e Skills Academy - Work
Experience/Placement  (14+)                
Work experience attendance for
students from schools, colleges and
Universities (14 years plus) who
undertake a work-experience
placement .  This KPI is aimed at
providing students with the opportunity
to carry out tasks agreed by the
education provider and the employer
enabling the learner to gain a
meaningful insight into the construction
sector.      This target also describes
work experience attendance for
persons who are not enrolled in a
course of education/study. Minimum 5
working days.
Tier 1 to engage with local educational services schools, colleges,
universities, can include individuals from organisations such as
Princes Trust, Probation Service, Job Centre Plus, Women into
Construction, Armed Forces re-settlement programmes or local
community organisations, to identify suitable candidates. Engage
with sub-contractor, suppliers professional service providers to
identify possible placement opportunities in their
companies/organisations. It may also be appropriate for individuals
seeking a career change
8.1f Skills Academy - Existing
Apprentices
An apprentice persuing a formal
apprenticeship framework in level 2 or
above N/SVQ employed on project by
Main contractor, sub-contractor or
Professional service provider.
Identify within and with Sub-Contractors, Professional Services
providers through tier 1 meetings, hub SW Training and Recruitment
Advisory Days, any existing or redundant/displaced apprentices who
have to potential to work on the project during their apprenticeship
(tier 1 contractor can elect to designate an as a completer instead
should they complete during the time)
8.1g Skills Academy - Overall Delivery
of Project Outcomes              
HSW to over achieve by a minimum of
10% across the average of our CITB
Client Based Approach based KPI's. This
is a measure of all our Tier1s
aggregated performance on  projects
completed during the year.
HSW to over achieve by a minimum of 10% across the average of our
CITB Client Based Approach based KPI's 
Page 104 of 167

Page 105

Appendix 3 (continued) – definitions for KPIs outlined in section above
KPI  REF KPI DEFINITION KPI ACHIEVEMENT Arrangements & Delivery 
8.1h Skills Academy - Training Events
Delivered (Qualifying the
Workforce)      
SVQ Level 2 or above, diplomas,
professional qualifications, including
Advance H&S (SSSTS, SMSTS, IOSH,
NEBOSH) Industry related certification,
held externally or in-house, project /
sector specific learning, eg.Leadership &
Management, Supervisory,  Installation,
environmental related training courses.
Includes also Apprentice Completers.
Identify within and with Sub-Contractors, Professional Services
providers through tier 1 meetings, hub SW Training and Recruitment
Advisory Days, to Identify any ongoing or upskills requirements, can
include hub SW bespoke in house 1 day training courses, or
accredited training courses providers such as CITB or other training
providers. Identify anyone likely to complete apprenticeship during
the project.                                                                                                       
8.1i/j Skills Academy - Educational
Activity  (CCIAG)   - SMEs and
teaching staff.       
Construction related events to support
the educational curriculum. 
Events/activities delivered - topics could
include;  enterprise, technology, maths,
science, engineering or careers advice,
aimed to increase awareness and the
opportunities available in the
construction industry. Focus on
improving the image of the sector.
Construction supported community
benefit initiative delivered to SME's and
Teaching Staff  (including Recruitment
and Training Advisory Days, DEC,
Primary Engineering, and others)
1. Tier 1's to engage with local educational services, early years,
schools, colleges, universities, adult influencers, career advisors,
learning providers, community groups, to identify opportunities to
deliver events, can include Construction Ambassador Programme /
STEM activities, 2.  Tier 1 to hold hubSW Recruitment and Training
Advisory Days, or own equivalent, aimed at SME's   3. Workshop
sessions delivered for example local educational services, schools,
colleges, PS, DEC, Primary Engineering 
8.1k Skills Academy - Social Impact
Event or Contribution
Programme-wide Tier 1 annual
community project.     Aimed at
disadvantaged groups within the local
community, which have a positive
impact. 
Supporting council initiatives, organisations, and Institutions such as
Princes Trust, for example  young people in care/post care, people
with learning difficulties - e.g.: mentoring, a series of support
measures to produce a positive outcomes                     
Page 105 of 167

Page 106

Appendix 3 (continued) – definitions for KPIs outlined in section above
KPI  REF KPI DEFINITION KPI ACHIEVEMENT Arrangements & Delivery 
8.2a Companies involved with local
employment and training
projects
Companies working on the project
including main contractor,  working
with organisations promoting local
employment, education,  volunteering
or placement opportunities.
Contractor to identify sub-contractors involved with local
employment and training projects, and any involvement by
Contractor direct. hub will coordinate placements from agencies
such as Ayr College or through CITB which will count in meeting KPIs.
School / College organised visits will also count to meet this KPI.
8.2b Supply Chain Institute -Contract
opportunities for Territory based
contractors (%)
Opportunities afforded to South West
Territory based companies through
market testing or tendering as a
percentage of total opportunities
created.
Ensure that at least 55% (rising to max 70% in 2018-19) of tendering
opportunities go to companies in the hub SW area.
8.2c Supply Chain Institute - Local
supply chain events to engage
local companies
This involves events where Tier 1
Contractors will come face to face with
local sub-contractors and suppliers with
an opportunity to talk about potential
projects
This will involve events such as 'Meet the Buyer' events, Supplier
Showcases and hub Club Networking meetings.
8.2d Supply Chain Institute - Local
companies given pricing/
tendering opportunities for first
time by Tier 1 or M+E Contractors
First timers in hub located locally and
under contract to Tier 1s or the
appointed M+E Contractor. Have never
worked on a HSW contract before.
Ensure that local first timers are included in the market
testing/tendering process. Contact HSW Community Benefits team
who can confirm status.
8.2e Supply Chain Institute - Local
companies graduated from the
Building for Growth Programme
Companies based in HSW area or
Scotland based professional Services
practices completing the programme.
(hub SW Target)
Recruitment and delivery by Community Benefits team in
conjunction with the Tier 1 contractors. Organised twice per annum.
Max 10 companies per programme.
Page 106 of 167

Page 107

Appendix 3 (continued) – definitions for KPIs outlined in section above
KPI  REF KPI DEFINITION KPI ACHIEVEMENT Arrangements & Delivery 
8.2f Supply Chain Institute - Local
business improvement support
and workshops
One to many workshops or one to one
support to local companies to help
improve their business.
This could cover a range of subjects and delivery methods. Topics
include Business Health Checks, business and people management,
business strategy, planning, HR development, financial
management, succession planning, time management, accreditation
support etc. These can be delivered either to an individual company,
or as a learning event attended by people of different companies.
The Tier 1 can claim this KPI by attending and participating in the
event programme facilitated by the SCI. One to one interventions
will be allocated by the SCDM on an equitable and as need basis to a
hub project.
8.2g Supply Chain Institute - Business
Expansion Support and
Workshops
One to many workshops or one to one
support to local companies to help
expand their business.
This could cover a range of subjects and delivery methods. Topics
include marketing, sales, tendering, web development, social media
etc. These can be delivered either to an individual company, or as a
learning event attended by people of different companies. The Tier 1
can claim this KPI by attending and participating in the event
programme facilitated by the SCI. One to one interventions will be
allocated by the SCDM on an equitable and as need basis to a hub
project.
8.2h Supply Chain Institute -
Construction Specific Learning
Events and Workshops
One to many workshops or one to one
support to local companies to help
improve construction specific aspects of
their business operations.
These are most likely to be on-site training events such as BIM
workshops, Waste, Environment and Health and Safety Tool Box
talks organised by the Tier 1 Contractors for their team and sub-
contractors. There may also be some one to many events organised
for the wider supply chain by the SCDM.
8.2i Supply Chain Institute - Third
Sector Businesses – hubSW
projects contracts awards/
opportunities
Not for profit organisations with a
trading arm which can supply hub
projects in some way afforded contract
opportunities or award a contract on a
hub project. 
Could bid normally as part of the project procurement or be
awarded a special project by the Tier 1 as part of its community
engagement activities. The site catering contract if going to a not for
profit public good organisation could qualify as well an org winning a
regular work package.   
Page 107 of 167

Page 108

Appendix 3 (continued) – KPIs linked to DBFM contracts 
Cumbernauld
Academy DATES COMMENTS/NOTES DELIVERED
APPRENTICESHIP
2021
APPRENTICESHIP
2022
APPRENTICESHIP
2023
FES FM
MECHANICAL
AND ELECTRICAL
APPRENTICESHIPS 23/04/2021
PRESENTATION
DELIVERED VIA
MICROSOFT TEAMS
JOINT WITH
GREENFAULDS HIGH (6
PUPILS FROM
CUMBERNAULD AC
PRESENT) 1
1 STUDENT -
ELECTRICIAN
APPRENTICESHIP 1 STUDENT 
FES FM -
TRAINING
CENTRE
22/10/2021
TRAINING SESSIONS
FOR STUDENTS
WISHING TO APPLY
FOR APPRENTICESHIPS 
(no students attended)     
08/12/2021 1 (4 students attended)     
22/02/2022 (no students attended)     
23/03/2022 (no students attended)     
20/04/2022 cancelled (exam time)     
15/06/2022 cancelled as per FES     
14/09/2022 1 (3 students attended)     
18/01/2023 1 (4 students attended)   
24/01/2023 1 (4 students attended)   
Page 108 of 167

Page 109

Appendix 3 (continued) – KPIs linked to DBFM contracts 
Greenfaulds
High School DATES COMMENTS/NOTES DELIVERED
APPRENTICESHIP
2021
APPRENTICESHIP
2022
APPRENTICESHIP
2023
FES FM
MECHANICAL
AND ELECTRICAL
APPRENTICESHIPS 23/04/2021
PRESENTATION
DELIVERED VIA
MICROSOFT TEAMS
JOINT WITH
CUMBERNAULD AC (22
PUPILS FROM
GREENFAULDS HIGH
PRESENT) 1 0   
FES FM -
TRAINING
CENTRE
22/10/2021
TRAINING SESSIONS FOR
STUDENTS WISHING TO
APPLY FOR
APPRENTICESHIPS 
1 (8 students attended)     
08/12/2021 1 (2 students attended)     
22/02/2022 1 (4 students attended)     
23/03/2022 1 (7 students attended)     
20/04/2022 cancelled (exam time)     
15/06/2022 cancelled as per FES     
14/09/2022 1 (5 students attended)     
18/01/2023 1 (4 students attended)   
24/01/2023 1 (4 students attended)   
10 November 2022 – FES FM and Apprentice (former pupil of Cumbernauld Academy) presented career opportunities at S2 Careers’ event at
Cumbernauld Academy
27 & 31 January 2023 – FES FM Training Officer delivered interview skills workshops at Cumbernauld Academy & Greenfaulds High School.
2 March 2023 – FES FM delivered pre-employment BTEC assessment. Assessment for plumbing and heating engineers. 
Further training centre sessions to be arranged for September – November 2023 for both Greenfaulds High School and Cumbernauld
Academy.
FES FM 2023 Apprenticeship interviews taking place May 2023
Page 109 of 167

Page 110

Appendix 3 (continued) – KPIs linked to DBFM contracts 
• Tigers Training/Morgan Sindall Joint Venture – total of 29 North Lanarkshire young people started 13 week pre-apprenticeship training on 23 January 2023.
• Primary 7 Construction Pilot - Tigers and NLC Pathways; first steps into construction. Site visits arranged with Tier 1 contractors at Chryston and Riverbank.
• Working in collaboration with Vocational Education – work placements for Foundation Apprentices with Tier 1 contractors and their supply chain. To date 16nr
FAs placed in June and October 2022. Two of these students were successful in gaining Graduate Apprenticeships with Tier 1 contractors: Morgan Sindall and Kier
Construction.
Employer engagement – 29 sessions delivered to date to Level 4/5 construction classes. 
Page 110 of 167

Page 111

Appendix 4      
GUIDELINES ON TIMESCALES FOR PROJECT DEVELOPMENT AND CONSTRUCTION FOR NEW BUILD HUB PROJECTS INVOLVING SCHOOLS 
Overall Timeline    Committee Approval Stages
Core Project (New Build) 
Procurement to Occupation  
Project Development Construction Start /
Duration          
Community Hub incorporating a single primary school
- Two stream (Up to 434 pupils)
2.25 years*   12 months* 15 months
Community Hub incorporating a single primary - Three
stream (435-651 pupils)
2.75 years*   15 months* 18 months
Community Hub incorporating a High School 3.4 years*   18 months * 22 months
Community Hub incorporating more than one primary
school.  This scenario usually includes either two
schools, or school/s and community facilities.
3.2 years*   18 months * 20 months
Town Hub/Community Hub incorporating more than
one education sector.  This scenario may include: High
school; primary school(s); early years; ASN;
community; partnership; sport and leisure zones; etc.
Town hubs with more elements/zones will be require
more time at ‘project development’ stage and may
require more time at ‘construction stage’ dependant
on complexity of project.
At least 3.7 years*   At least 20 months * At least 24 months     
Overall Timeline - Procurement to Occupation    
The timeline for the Delivery Programme starts from all committee approvals being in place, a site in council title and a project being approved for
progression through appropriate governance processes (such as Hub Deliver Board).       
Page 111 of 167

Page 112

Project Development
This Delivery Project Development process includes the procurement to appoint the contractor and their external design team;   the technical site surveys
to allow design to commence; Stage 1 concept design development, 12 weeks statutory pre planning consultation; Stage 2 detailed design and work
package tender preparation; 5 months statutory full planning approval, tendering to external supply chain for all construction activity; Pricing and Contract
negotiation, committee approval for the final price and execution of the construction contract. 
* As the council transitions to building Town and Community Hubs – due to the specific nature of each project and the expected engagement with local
communities, an intelligent brief will be developed for each project. This may be because of the complexity of the site; multiple service users within a
shared campus environment; Carbon reductions strategies; constructions phasing risks to existing users; etc. This added element inevitably adds time to
the process but will ensure alignment with the Town and Community Hub guiding principles. The project development timescales outlined in the table
above, may therefore be extended.  
Construction Duration   
The start of construction requires committee approval to agree a contract is to be entered into as this constitutes approx 95% of the total funding.
This depends on size of building, the extent of site abnormals and their remediation and any construction phasing.  Construction will be longer if new
school/s being built on a site of an existing school that will remain in operation and requires to be demolished in order to complete all of the new
development.  The indicative average timeline reflects the first phase of construction which is normally that the new building is first to be built for
occupation.     
Page 112 of 167

Page 113

North Lanarkshire Council
Report 
Education, Children and Families Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref SP/LP Date 23/05/23 
Community Asset Transfer Request – Cumbernauld Cottage
Trust 
From  Stephen Penman, Chief Officer – Strategic Communication and Engagement  
E-mail penmanste@northlan.gov.uk Telephone 07947997750 
Executive Summary 
The purpose of this report is to provide the Education, Children and Families Committee
with the details of a Community Asset Transfer (CAT) request relating to the Former
Cumbernauld Theatre and to provide information on the outcome of the assessment
process together with a recommendation for decision. 
Details of the application and supporting documentation can be accessed here. 
Recommendations 
It is recommended that the Education, Children and Families Committee: - 
1. Acknowledge the detailed assessment of the application against approved criteria
and the recommendation for rejection of the proposal by the CAT Leadership
Group; and 
2. approve the rejection of the proposal for Community Asset Transfer of the former
Cumbernauld Theatre (shown on map at appendix 1) as outlined in the
application which can be accessed here and reflecting the council’s Community
Asset Transfer Policy. This is based on the assessment findings summarised in
this report and set out in full in Appendix 2 of this report. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (22) Facilitate a North Lanarkshire wide approach to asset
rationalisation, including with communities and partners
AGENDA ITEM 9
Page 113 of 167

Page 114

1. Background 
1.1 Part 5 of the Community Empowerment (Scotland) Act 2015 places a statutory duty on
local authorities and certain other public sector agencies to develop a clear process for
supporting community participation and ownership of assets. The associated guidance
for the delivery of Community Asset Transfer (CAT) articulates that the council’s
responsibilities are to: 
• establish, maintain, and make available a register of land owned or leased by the
council to the best of its knowledge and belief; 
• develop clear decision-making criteria, review, and appeals procedure for
Community Asset Transfer; 
• actively provide information and promote the process for Community Asset Transfer
and Participation Requests aligned to other participation opportunities; 
• assess the capacity of the organisation making a CAT request and provide support
to assist them to fulfil their aspirations around community empowerment and
participation outcomes; and 
• publish information relating to requests; and produce and publish annual reports. 
1.2 The council’s Community Asset Transfer (CAT) process and assessment criteria were
approved in 2019 by the then Community Empowerment Committee. The North
Lanarkshire Council Community Asset Transfer policy can be viewed here. 
2. Report 
North Lanarkshire Decision Making 
2.1 Following initial engagement with groups interested in submitting a CAT request
support is provided to the community organisation by key staff to assist them to
understand the process and requirements and to self-assess their ‘readiness’ and
capacity to take on an asset. 
2.2 Upon a formal application being made, the council is bound to carry out an assessment
of the request, establish that the applicant is a qualifying body and assess both the
sustainability and likely benefit of the asset transfer. Benefits can include social
wellbeing, economic benefit and provision of services and activities that would not
otherwise be provided. The council must adhere to the following process. 
• acknowledge the request and provide information regarding timescales – the
acknowledgement date is known as the validation date.
• the timescale for a decision relating to a CAT request is normally 6 months from
validation date. 
• the council and the group can mutually agree a different timescale if required (ie
linked to committee cycles, funding decisions, etc).
• If the CAT request is not approved, the group must be provided with information
relating to review and appeals procedures. 
2.3 On receipt of a CAT request made under the terms of Community Empowerment
(Scotland) Act 2015 a panel of senior officers from across council services undertakes
an assessment of the application. Thereafter the CAT Leadership Group made up of
the Chief Officers for Strategic Communication & Engagement and Assets &
Procurement are presented with the assessment information in order to consider and
make recommendations to the committee for the relevant holding service.
Page 114 of 167

Page 115

2.4 The legislation makes no distinction between operational and surplus assets. Where an
asset is operational or it has been declared surplus, and a current or alternative use is
identified as the most beneficial option for the council, a CAT application must
demonstrate that its proposed use brings a higher level of community benefit. This is a
key consideration in the council’s decision making, as is sustainability of the business
model, evidence of community support or community benefit and organisational
capacity to manage the asset. 
2.5 Cumbernauld Cottage Trust CAT application 
Cumbernauld Cottage Trust submitted a formal CAT request on 14th September 2022.
The application included all required supporting information and met the criteria for it to
be assessed under the terms of the Community Empowerment (Scotland) Act 2015
and in line with the council’s CAT policy and process. 
A panel of senior officers from key services met on 19th January 2023 to undertake an
initial assessment of the application. This included: 
• Estates (Assets and Procurement)
• Active and Creative Communities
• Community Partnership Team
• Community Facilities
• Financial Solutions   
The findings of the Officer assessment panel were reported to the CAT Leadership
Group on 1 March 2023 for consideration. 
The outcome of the assessment is attached as appendix 4. A summary of the
assessment is below. 
2.6 Assessment of CAT Request 
Summary Grading Very
Strong
Strong Moderate Weak Very Weak
1.Details of the asset    x 
2.Organisation information   x  
3.Type of Request   x  
4.Link to the NL Plan   x  
5.Community Proposal   x x 
6.Support     x
7.Financial Information     X
8.Risk/Social Impact     x 
2.7 Cumbernauld Cottage Trust are a not-for-profit voluntary group formed by local people
for the benefit of the local community. Underpinning the CAT request is an aim to retain
and restore the Former Cumbernauld Theatre site for use by individuals and
community groups. Details of the application can be accessed here. 
2.8 It is evident from the application that the Cottage Trust has in place a Board with a
range of skills, expertise, and experience around delivery of the proposed activity and
service provision. The governance arrangements meet the criteria for the submission of
the CAT to be considered by the council. However, several key factors led to the
conclusion that the community benefits of transferring this asset on the terms proposed
Page 115 of 167

Page 116

do not outweigh the risk and concern identified through the assessment process. The
main risks identified are around the potential for duplication of service and therefore
both the possibility of detriment to the Trust and the successful implementation of their
business plan and to existing providers especially where the council has reprovisioned
and invested in a similar asset and service offer through the Lanternhouse Theatre site. 
2.9 An overview of areas of challenge are as follows:
Potential for duplication of service: The case for the transfer of the asset is built
upon a service delivery model that is likely to create duplication with existing services
that the council has already invested in. An operational decision was taken to close and
cease delivery from this site and to relocate provision previously delivered to the new
Lanternhouse Theatre site at Cumbernauld Academy Campus (approximately 1km
away). The capital investment in relocating the theatre and café provision to the new
campus has been significant (in the region of £37 million) and the council contributes a
further resource of approximately £110k recurring revenue supported through a Service
Level Agreement. The application does not adequately refer to how the services being
offered as part of the CAT proposal add value to those already being delivered via
other local venues and organisations in the Cumbernauld area, nor does it explore or
evidence through market research that the potential for competition regarding income
streams has been considered. The map of facilities at appendices 3 and 4 shows the
range of services and facilities currently available in the area. Any duplication could
undermine the financial projections and reduce the Trust’s ability to meet income
targets. 
Project Delivery: While there is reference to staffing and management around service
delivery at the point that the project is operational, it is unclear how the project would
be robustly managed throughout the early stages including attracting and securing
capital investment, procurement and construction. A project of this scale, risk and cost
requires to be carefully project managed. The submission does not reflect this or
provide full consideration of the operating model and ensuring that this is sustainable
and can balance the required generation of capital investment, building and
construction with the likely need for phased delivery and maintenance (including the
potential for further decline for areas of the site that resource may not allow to be
prioritised for delivery). 
Evidence of need/community benefit: There was some community engagement
through public meetings in 2018 and a survey in 2019. The survey received 1500
responses, (3% of Cumbernauld population). This was pre pandemic and prior to the
opening of the new theatre site in 2021. There is little evidence in the application of
more recent engagement or assessment of need reflecting current provision and
changes in behaviour/trends arising from the Covid-19 pandemic or indeed the impact
of the recent cost of living crisis. The council has witnessed a 50% drop in use post
pandemic in its own community facilities, with a slow rise in activities through recovery. 
This information could inform a negative impact on the ability of the Trust to meet
projected income targets from lets, hiring of space and community use of income
generating activity such as the café.
Financial viability: A site visit was undertaken by the assessment group and showed
the extent of the work required to bring this site to operational standard. This is further
evidenced in a condition survey undertaken in February 2023. The application does not
adequately evidence how the significant investment for capital works would be
resourced nor does it show how the community body will financially support the
operation of the building while the construction works are ongoing. The Trust has had
Page 116 of 167

Page 117

the property valued at £45k, which is within an acceptable tolerance of the council’s
anticipated market value of £40k . An offer of £20k for purchase of the asset has been
made. Under the requirements of the Community Empowerment (Scotland) Act 2015
the group are entitled to make an offer at this level. An offer significantly below market
value should evidence substantial community benefit which balances with the level of
discount. The application in this case does not strongly enough evidence that the
planned ‘offer’ to communities adds value to, compliments or provides an alternative to
existing provision. The projected income generation does not reflect comparable
incomes levels of sites operated by the council providing similar service provision. In
terms of the council’s duties around best value, as outlined above there has been
significant investment through a funding agreement and capital works for the
Lanternhouse Theatre (building) and transfer of the asset at the offer price would
present financial risk. 
Overall the capital works to bring the building into operation and the expected income
generation from operation of the services planned are aspirational. The application did
not provide sufficient reassurance of the financial sustainability of the project to balance
the potential risk to the council of transferring the asset. There is no evidence that costs
provided have been assessed in the context of the current ‘cost of living and ‘energy’
crisis and how these may impact on the operating costs in the short/medium term. 
Potential for ongoing maintenance burden/revenue implications for the council:
The submitted request does not include the group taking on maintenance of the
associated car park and access road which service the site and provide access to the
parking provision for the buildings. The CAT application includes part but not all of the
car park area. Agreeing to these terms may create a maintenance burden and liabilities
for the council where there is not currently an operational budget associated with this
asset. The closure of the site was assumed following the relocation of the provision to
an alternative location. It would be challenging and complex to consider the transfer of
the building in isolation from the car park and access road. 
3. Measures of success 
3.1 Consideration is given to a Community Asset Transfer request in accordance with the
requirements of the Community Empowerment (Scotland) Act 2015, associated
Scottish Government Guidance and the Council’s Community Asset Transfer Policy.
Performance measures in respect of Community Asset Transfer and Participation are
included in the Plan for North Lanarkshire – Strategic Performance Framework. The
current performance. 
3.2 Measures cover the following: - 
• numbers of successful Participation and CAT requests; 
• number of community groups engaged in Participation and CAT requests; 
• support provided to community groups and organisations as a result of initial CAT
or Participation Request enquiries; and
• positive outcomes or referrals because of initial CAT or PR enquiries   
Page 117 of 167

Page 118

4. Supporting documentation 
4.1 Appendix 1 – Map
4.2 Appendix 2 – CAT Assessment report
4.2 Appendix 3 – Map of existing facilities 
4.4 Appendix 4 – Cumbernauld Asset Map 
Links 
• North Lanarkshire Council information on Community Asset Transfer
process 
• North Lanarkshire Councils Community Asset Transfer (CAT) Policy 
• Cumbernauld Cottage Trust CAT application 
• Condition survey 
•  Lanternhouse Theatre Service Level Agreement 
Stephen Penman
Chief Officer
Strategic Communication & Engagement 
Page 118 of 167

Page 119

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
The Community Asset Transfer and Participation process assists the council to deliver on
both the Fairer Scotland and key equality duties. In particular, the policy will further the
public sector equality duties to advance equality of opportunity and foster good relations.
An integrated Fairer Scotland/Equality Impact Assessment has been undertaken in respect
of the CAT policy. No concerns have been highlighted as a result of the assessment. 
An EQIA will be undertaken to assess the impact of any decisions taken and published
accordingly 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☒ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Financial Solutions have been involved in assessment. Concern and risk highlighted
regarding financial viability of the project and potential for duplication of service that
the Council has already reprovisioned and invested in from another site. Offer of
£20k is below anticipated market value of £45k. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
However may impact on and link with the development of the Council’s Volunteering
strategy and approach 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☒ No ☐
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Page 119 of 167

Page 120

Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Legal representative involved in CAT process in an advisory capacity. This
application was submitted under the Community Empowerment (Scotland) Act 2015
and has been assessed in line with the associated statutory guidance. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☒
Adequate procedures in place to manage the handling of personal information in line
with the data protection procedures 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐
No x 
☒
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Information linked to Community Asset Transfer applications, decision making and
outcomes require to be published on the Council’s website North Lanarkshire
Council information on Community Asset Transfer process 
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
Page 120 of 167

Page 121

If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
The CAT process is reflected and managed as per the Council’s Risk Management
approach. Details of specific identified risks relating to this application around
outlined throughout the report. The main risk concerns are around potential
duplication of services, financial viability and maintenance burden on the Council,
project management and insufficient evidence of need. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 121 of 167

Page 122

Appendix 1 
Page 122 of 167

Page 123

Appendix 2 
Assessment Report 
Assessment framework used to inform the recommendation on a Community
Asset Transfer Request
Name of Organisation/Applicant Cumbernauld Cottage Trust
Details of the Asset Former Cumbernauld Theatre 
Community Area/Ward  Cumbernauld East (Ward 4)
Date submitted 14 September 2022
Date of Assessment Panel 19th January 2023
Date of Leadership Group  1st March 2023
Date of committee decision  May 2023   
Summary comments from assessment panel 
Assessment undertaken by . • Community Partnership Manager
• Strategic Asset Manager
• Group Manager, Estates)
• Surveyor, Estates
• Active and Creative Communities
Manager
• Facility Support Services Manager
• Financial Solutions Manager
Final Recommendation from Leadership Group
based on outcome of assessment by Corporate
Assessment Panel
Reject 
CAT Leadership Meeting 1st March 2023,
3.30pm, MS Teams 
Summary Grading Very
Strong
Strong Moderate Weak Very Weak
1.Details of the asset    x 
2.Organisation information   x  
3.Type of Request   x  
4.Link to the NL Plan   x  
5.Community Proposal   x x 
6.Support     x
7.Financial Information     X
8.Risk/Social Impact     x 
Page 123 of 167

Page 124

1  Details of the Asset – Includes asset status and proposed use
This section asks the council to ensure they are in a position to transfer the asset 
ÿ  Very Strong:  The proposal has a cost saving, does not impact on council direct delivery or     
service and there are no restrictions on the asset transfer 
ÿ   Strong: The proposal is cost neutral to the council; it does not impact on council direct      
delivery of services and there are no restrictions on the asset transfer. 
ÿ   Moderate: the proposals present difficulties on the council in terms of one or two of the 
following – direct cost, council direct delivery of services and or restrictions on the assets     
transfer. 
x   Weak: the proposals present difficulties to the council in terms of cost, council direct 
deliver of services and restrictions on the asset transfer. 
ÿ   Very Weak: unlikely to proceed because of ownership restrictions on the asset this would      
prevent a transfer of responsibility or ownership to another organisation. 
Comments 
The transfer of this asset is likely to present challenge to the council in relation to  
• The case for the transfer of the asset is built upon a service delivery model that is likely
to create duplication with existing services that the council has already heavily invested
in. The asset was historically transferred to North Lanarkshire on a commercial basis as
part of the legacy estate and was previously leased to the theatre group to deliver
previously agreed provision. An operational decision was taken to close and cease
delivery from this site and to relocate provision previously delivered to another site
(specifically the new Lanternhouse Theatre site at Cumbernuald Academy Campus). The
investment in this site and relocation of provision was on the assumption that delivery
from the old theatre site would cease through closure. There has been significant capital
investment (£37million) in relocating the theatre and café provision to the new campus
and approximately a further £110k recurring revenue contribution from the Council
supported by a Service Level Agreement . 
• the request is for transfer of the asset and part of the car park. The request does not
cover the group taking on maintenance of the associated car park and access road which
both services the site and supports the parking provision of the buildings use. Agreeing
to these terms may create a maintenance burden and as outlined above the council has
not identified an operational budget associated with this asset as the closure of the site
was assumed following the relocation of the provision to an alternative location. It would
be challenging and complex to consider the transfer of the building in isolation from the
car par and access road. 
• A site visit undertaken by assessment group and the extent of the work required to bring
this site to operational standard was witnessed. This is further evidenced in a condition
survey (Feb 2023) and further highlights concern relating to the viability of the project. 
Page 124 of 167

Page 125

2 Organisational Information – Includes governance and capacity to deliver 
Very Strong: Applicant has clearly evidenced that they are a robust and viable organisation 
with effective governance arrangements in place. 
ÿ   Strong: Applicant has provided adequate evidence that they are a robust and viable      
organisation with satisfactory governance arrangements. 
X    Moderate: Applicant has evidenced some signs of being robust and viable and partial      
information provided on governance arrangements. 
ÿ   Weak: Applicant has shown no evidence of being robust and viable and no/little information     
being provided on governance arrangements. 
ÿ   Very Weak: Applicant has provided no evidence of being robust or viable. Governance      
arrangement does not meet the criteria for asset transfer. 
Comments 
It is evident from the application that the Cottage Trust has a strong Board with a range of skills,
expertise, and experience particularly around delivery of the proposed activity and service
provision. They have robust governance arrangements in place that meet the criteria for the
submission of the CAT to be considered by the Council. However, there appear to be some gaps
identified in relation to evidence to suggest whether the Trust in its current format has the
capacity or resource to project manage the whole process for a project of such scale. For
example, there is reference to staffing around service delivery when the project is operational,
but it is unclear how the project would be robustly managed throughout the early stages
including attracting and securing capital investment, procurement and construction. A project of
this scale, risk and cost would ideally require a full time Project Manager. The submission does
not reflect this and appears to be grounded more in sentimental affiliation with the building itself
without full consideration of the actual operating model and future proofing for success in
relation to demand for the services they have to offer and that it is suggested may already exist
within a short proximity from the potential project. 
Page 125 of 167

Page 126

3 Type of request, payment, and conditions
This section confirms the type of request and seeks and whether or not the price reflects a
fair price for the asset taking into consideration community benefit 
ÿ   Very Strong: Applicant has proposed acceptable terms, with prices reflecting Market/Fair 
Value. (score would reflect acceptable terms; for example – the right timescale for being      
able to complete the sale or lease and funds are already in place) 
ÿ  Strong: Applicant has proposed terms, with prices reflecting Market/Fair Value. 
X   Moderate: Applicant has proposed terms, with prices well below Market/Fair Value. 
ÿ  Weak: Applicant has failed to propose terms or prices. 
ÿ  Very Weak: Applicant unsure of securing funding to afford costs. 
Comments 
The Trust has had the property valued at £45k in a similar region to the councils anticipated
market value of £40k. An offer of £20k has been made and the Trust are entitled to make an
application for this level of discount under the requirements of the Community Empowerment
(Scotland) act 2015. Given the status of the asset the offer in theory would not impact negatively
on the council from a financial perspective. However, an offer significantly below market value
should evidence substantial community benefit which balances with the level of discount. The
application in this case does not strongly enough evidence that the planned ‘offer’ to
communities adds value to, compliments or provides an alternative to existing provision. The
application and business plan references some community consultation pre pandemic and does
not provide a current assessment of need to justify the level of discount. 
The terms of the application excluding the access road and the carpark is likely to create a
maintenance burden on the council when the council decision to close the asset following its re-
location of the provision means that there is no operational budget associated with the site or its
maintenance. 
There is also concern around likely duplication of service across the activity associated with the
CAT proposal, which delivered by the Lanternhouse Theatre which the council has significantly
invested in and those available and delivered via other local venues and organisations in the
cumbernauld area. The application fails to mention these other facilities and competition
regarding income streams is a concern if they have not undertaken sufficient market research
before submitting the application. The attached map of facilities shows the range of services and
facilities available and how there is the potential for duplication of services in the area. This calls
into question the projected income generation outlined in the application as any duplication
could reduce the Trusts ability to meet income targets. 
The projected income generation does not reflect comparable incomes levels of sites operated
by the council which provided similar service provision. 
Page 126 of 167

Page 127

4 Link to Strategy– How the project links into the vision and ambitions set out in the Plan
for North Lanarkshire (TPFNL) 
ÿ   Very Strong: Applicant has clearly evidenced that their project links in to the key themes of      
TPFNL 
ÿ   Strong: Satisfactory evidence that the applicant understands the importance of linking to the      
outcomes of the TPFNL 
ÿ   Moderate: Limited evidence that the applicant understands the need to ensure the projects      
reflect one of more of the strands of the  TPFNL. 
X Weak:  Little or no evidence that the applicant has made a clear connection to the TPFNL 
ÿ   Very Weak: Applicant has no understanding of the TPFNL 
Comments 
The submission outlines how it will support the key priorities across TPFNL and maps how the
proposal fits with priority areas. This is however a desktop exercise that talks about how the
proposal in a more general sense supports the ambitions rather than specifying or evidencing
how the proposal provides additionality or a different offer that supports the vision for NL and
the future operating model. The offer at the Lantern house Theatre (approx. one km away) and
the range of existing community facilities in the area mean that the services as outlined in the
application could present competing pressures as it duplicates the service provision and fails to
align to the future hub operating model. The council has reprovisioned and invested in services
and capital improvement linked to the Lanternhouse site. Information relating to the funding
agreement with the Lanternhouse Theatre can be accessed hereatt96641.pdf (northlanarkshire.gov.uk).
As well as the ongoing annual investment from the Council of £110k outlined in the funding
agreement, the council has invested capital resources in the new Lanternhouse Theatre (to the
value of £37million. 
Page 127 of 167

Page 128

5 Community Proposal – Includes project aims, community engagement and community
benefit/need 
ÿ   Very Strong: Full consideration has been given to the aims, objectives, and vision with clear      
thought to the future direction of the proposal. The proposal provides, for example, a      
social/economic/environmental impact. Comprehensive evidence of need/demand provided       
including consultations, research, and surveys. 
ÿ    Strong: Adequate description of aims, objectives and vision for the proposal. A good       
understanding of the community benefits including adequate evidence. Need/demand 
evidence include some consultation and research. 
X Moderate: Limited description of the aims, objectives, and vision for the proposal. Some       
understanding of the community benefit but not underpinned by substantive evidence. Some       
evidence of need/demand provided including limited consultations, research, and surveys. 
X Weak: Inadequate or no description of aims, objectives and vision for the proposal. Limited      
reference to community benefit and associated opportunities. No evidence of need/demand       
provided. 
ÿ    Very Weak: No description of aims, objectives and vision for the proposal. No reference to       
community benefit. No evidence of need or demand provided. 
Comments 
While the aims of the Trust and the proposal are clear in terms of their aspirations, as outlined
throughout this assessment the main concern is around 
• duplication of services with the new theatre and school campus
• the management of the earlier stages of the project to balance generating capital
investment, building and construction and phased delivery and maintenance (including
the potential for further decline for areas of the site not prioritised for early work). 
There was some market evaluation with public meetings in 2018 and a survey in 2019. This was
pre pandemic and prior to the opening of the new theatre site in 2021. There is no evidence of
any more recent engagement or assessment of need reflecting current provision and changes in
behaviour/trends arising from the Covid 19 pandemic. There is little evidence of additionality in
the proposal. Overall, the application is light on evidence of current community engagement and
need. Survey completed in 2019 received with 1500 responses, (3% of Cumbernauld population).
The council within its own community facilities has witnesses a 50% drop in use post pandemic,
with a very slow rise in activities.  The council in light of this are currently reviewing their own
assets. With other third-party community activities, this is potentially a high-risk area for the
group to take on 
Page 128 of 167

Page 129

6 Support – Includes stakeholder engagement and partnership working
This section looks Including evidence community and stakeholders have been engaged 
ÿ    Very Strong: Applicant has clearly demonstrated links with relevant stakeholders and groups      
as well as strong local partnership and community engagement. Evidence of joint responsibility      
for delivery of other projects/service. 
ÿ    Strong: applicant has evidenced some partnership working arrangements. Relevant links with       
groups also evidenced along with strong community engagement activity. 
ÿ    Moderate: Applicant has demonstrated limited links with groups and community engagement       
activity. Some evidence of partnership working provided. 
X Weak: No/poor evidence of community involvement. No/poor evidence of partnership 
Working.
ÿ   Very Weak: No evidence of community involvement. No evidence of partnership working. 
Comments 
There was some market evaluation with public meetings in 2018 and a survey in 2019. This was
pre pandemic and prior to the opening of the new theatre site and there is no evidence of any
more recent engagement or assessment of need reflecting current provision and changes in
behaviour/trends arising from the Covid 19 pandemic. There is little evidence of additionality in
the proposal. Overall, the application is light on evidence of current community engagement and
need. Survey completed in 2019 received with 1500 responses, (3% of Cumbernauld population).
A bulleted list of partners has been provided. There are similarities between planned provision
linked to this proposal and current services and other than providing a list of partners and stating
that they do and will work in partnership there is limited evidence of how engagement with
potential partners has taken place to inform complementary approaches. Further information
would have been useful in relation to local partners providing similar types of services and how
these have been mapped to avoid duplication. Some detail could have been provided of how they
would work together to deliver complementary services and activities. There may be
opportunities for the Trust to provide some proposed services with existing organisations and
from existing buildings and facilities which would have more closely supported the councils
ambitions around the Community Hub and future operating model. The application could be
viewed as being more grounded in local heritage and nostalgia rather than need which is
admirable, but the council needs to consider the major investment in service and capital at the
Lantern house site and the risk associated with transferring this asset that could require
significant investment. 
Page 129 of 167

Page 130

7 Financial Information – Includes fundraising, financial planning, and management
We will seek clarification of funding being in place or any potential delay in funding being
in place in time for the final transfer deadline. 
ÿ    Very Strong: Clear Evidence that sufficient financial resources are/will be in place by the time       
of transfer and good resource planning for short/ medium/long term sustainability       
demonstrated. Detailed, realistic and achievable income and expenditure, cash flow       
forecast provided along with a comprehensive contingency plan. 
ÿ    Strong: Evidence indicates that sufficient financial resources are/will be in place by the time of       
transfer and some resource planning has been demonstrated. Satisfactory income and       
expenditure and cash flow forecast. Some consideration has been given to contingency 
planning. 
ÿ    Moderate: Applicant has demonstrated there are some financial resources in place but all       
finances may not be available within the timeframe. There is limited evidence of resource       
planning. Basic income and  expenditure and cash flow forecast induced with limited       
consideration given to contingency planning. 
X   Weak: Insufficient financial resources currently in place and unlikely to be ready within the       
Time frame. No evidence to demonstrate resource planning. No income and expenditure and       
cash flow forecast provided, and no contingency plan outlined. 
ÿ    Very Weak: No evidence of financial resources in place. No evidence of resources or financial 
forecast to predict cash flow. 
Comments 
The projected capital works to bring the building into operation and the expected income
generation from operation of the services planned are very aspirational raising some potential
concerns and gaps in the application around   
• A lack of evidence of contingency planning (re expected income if delays with build,
emergencies, Cost of Living, pandemic, scenario planning, impact on costs) 
•  etc)
• Potential for competing services and facilities and the impact on income have not been
factored into financial plans 
• Crowd Funding is mentioned which is not considered a reliable income stream 
• Capital investment is very significant and as outlined above it is unclear how the major
construction project will be operationally managed 
The business case and application moves straight to delivery and does not fully lay out the scale of
the project or how it will be financially managed in terms of 
• Set up costs
• Build costs 
• Future delivery costs 
• Contingency planning 
Some points noted about revenue income 
• High level Income and Expenditure Table presented. However, production of an indicative
cashflow (indicates income v expenditure on a month by month basis) would have
Page 130 of 167

Page 131

provided reassurance that upward or downward trends in income and expenditure have
been considered, ensuring that obligations can be covered each month.
• Café/Bar projected revenue of £120k seems optimistic when compared to existing NLC
facilities as is let income for hire of spaces £10-20 p/h – there is no information provided
regarding what this has been benchmarked against or how these figures have been
reached 
• There is a projection of £300 per month from local businesses taking space however there
is already challenge in filling existing available empty space in Cumbernauld. Again it is
unclear if this is comparable to market evidence of need
• There is no evidence that costs provided have been assessed in the current ‘cost of living’
and ‘energy’ crisis and how this impacts on the operating costs in the short/medium
term? (Contingency planning) 
• There is no evidence in costings relating to assessment of technical support for delivering
arts and theatre activity as part of cost projections
• It is not clear how factoring of cost of owning/maintaining asset has been considered to
cover the period prior to mobilisation and generating income ( ie during construction,
early phases of delivery) 
As outlined above the council has invested through a funding agreement £110k revenue resource
as well as capital resources for the new Lanternhouse Theatre (building) to the value of £37
million 
The funding agreement can be accessed here att96641.pdf (northlanarkshire.gov.uk). 
Page 131 of 167

Page 132

8 Risk/Social Impact – Includes potential impact and barriers/challenges and 
understanding of managing the asset. 
ÿ   Very Strong: Full evidence that applicant has in place the necessary capabilities to manage the      
asset. Considerable awareness of the potential impact of the transfer on others, and      
barriers/challenges clearly identified. Comprehensive information provided on the anticipated      
social benefit/impact of the transfer and how this will be measured. 
ÿ   Strong: Satisfactory evidence that applicant has the necessary capabilities to manage the asset.     
Sufficient awareness of the potential impact of the transfer on others with consideration given     
to potential barriers/challenges. Adequate information provided on the anticipated social     
benefit/transfer. 
ÿ   Moderate: Limited evidence to demonstrate capabilities to manage the asset. Some awareness     
of the potential impact of transfer on others and consideration given to potential     
barriers/challenges. Minimal information provided on the anticipated social benefit/impact of     
the transfer. 
X Weak: Inadequate or no evidence of capabilities in place to manage the asset. Little or no 
awareness of the potential impact of the transfer on others or possible barriers/challenges     
identified. No social benefit/impact monitoring outlined. 
ÿ   Very Weak: applicant has provided no evidence of capabilities to manage the asset. No     
awareness of the potential impact of the transfer on others. No social benefit or impact    
monitoring in place. 
Comments 
As outlined at 7 and throughout assessment the business case and application does not fully
reflect the scale of the project or how it will be financially managed in terms of 
• Set up costs
• Build costs 
• Future delivery costs 
• Contingency planning 
The main risks are around 
• Potential duplication of service and therefore both the possibility of detriment to the
Trust and the successful implementation of their business plan and to existing providers 
especially where the council has reprovisioned and invested in a similar asset and offer
through  the Lanternhouse site. 
• Much of the income generation projected is linked to café, bar and letting of space. This is
an area that is still recovering from the pandemic and the cost-of-living crisis is impacting
further. Community use of leisure, recreation and social services and facilities has been
affected as previously stated. Participation in non-sport activities within the council remit
have dropped almost 50% post pandemic and social habits have changed. This is reflected
in the councils operating model plans and there is limited evidence that market need, and
trends have been assessed in the current climate 
Page 132 of 167

Page 133

Appendix 3 
Map of existing facilities 
Page 133 of 167

Page 134

Appendix 4
Cumbernauld Asset Map 
Page 134 of 167

Page 135

North Lanarkshire Council
Report
Education, Children, and Families Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  AG Date 23/05/23 
Strategic Performance Framework - latest performance results for
Children’s Social Work and Protection 
From  Alison Gordon, Chief Social Work Officer (Children, Families, Justice, and
Integrated Practice)  
E-mail GordonAl@northlan.gov.uk Telephone 01698 332001 
Executive Summary 
For strategic overview and scrutiny purposes, this report provides Members of the
Education, Children, and Families Committee with an update of the latest results for a suite
of specific performance indicators for the Chief Social Work Officer (Children, Families,
Justice, and Integrated Practice) that can be compared nationally and are within the remit
of this Committee. 
This information complements information on social work performance and improvement
activity provided annually to committee through the Annual Report of the Chief Social
Worker (CSWO).  The most recent CSWO report for the period 2021/22 was presented to
Education. Children and Families Committee in February 2023.  The information in this
report and its Appendix 1 focuses more specifically on a statutory areas of children’s social
work services and provides additional national benchmarking information for key indicators. 
Children’s Social Work Services are delivered within a wider partnership context with
oversight and strategic direction also provided through the Chief Officers Public Protection
Group and Children’s Services Partnership, for which the CSWO is lead officer.  A key
driver of improvement and transformation over the past three years has been the Promise
as reflected in the Children’s Services Plan 2021-23 and two key programmes of work: 
Keeping the Promise -Care and Keeping the Promise – Family Support, which have been
the subject of regular reporting to Committee over the past two years. 
Recommendations 
It is recommended that the Education, Children, and Families Committee: 
(1) Review the high-level performance overview presented in Appendix 1, and the
supporting data contained within the linked Excel spreadsheet and identify where
further information is required to understand or investigate performance further. 
AGENDA ITEM 10
Page 135 of 167

Page 136

1. Background 
1.1 There are six inter-related strategic frameworks which are key to assessing the success
of The Plan for North Lanarkshire and monitoring delivery towards achieving the overall
vision by ensuring each stage is appropriately planned, guided, implemented, and
governed.   
1.2 The six frameworks focus on ensuring a corporate one council approach in respect of
Policy, Governance, Performance, Self-Evaluation, Project Management, and
Demonstrating Improved Outcomes for Communities.   
1.3 The Strategic Performance Framework comprises performance
measurement at three levels (as per the diagram on the right). 
This aims to collectively provide an overview of performance to
help understand the impact of council activities on improving
services and outcomes for the people and communities of North
Lanarkshire.  The measures in this Framework allow for day-to-
day activities, and progress towards achieving the long-term
vision set out in The Plan for North Lanarkshire, to be regularly monitored, reported,
assessed, and scrutinised.   
1.4 The Strategic Performance Framework is aligned to the Accounts Commission 
statutory direction which places a requirement on councils to report a range of
information in terms of (1) improving local services and outcomes, and (2)
demonstrating Best Value.  Key points of note in this respect are that the Accounts
Commission also expect to see: 
(a) A balance in reporting areas of improvement that have been achieved and not
achieved.
(b) Reporting that is undertaken in a timely manner.
(c) Easy access to performance information for all citizens and communities. 
1.5 A Performance Reporting Schedule supports the timely submission of a range of
performance information that facilitates Elected Members and senior management to
undertake regular performance reviews that inform scrutiny, challenge, and decision-
making processes.  This Schedule, endorsed by the Audit and Scrutiny Panel in
February 2023, includes Chief Officer’s individual six monthly Performance Reviews at
Service Committees in line with the Strategic Performance Framework. 
1.6 This report therefore presents the Education, Children, and Families Committee with
the latest performance results for the Children’s Social Work and Protection areas of
service for Members’ further review and scrutiny. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Page 136 of 167

Page 137

2. Strategic Performance Framework 
Education, Children, and Families Committee responsibilities 
2.1 In line with the terms of reference outlined in the Scheme of Administration, the
Education, Children, and Families Committee is responsible for monitoring and
reviewing performance information for the following Ambition Statements from The
Plan for North Lanarkshire: 
7.    Enhance collaborative working to maximise support and ensure all our children
and young people are included, supported, and safe. 
9.    Invest in early interventions, positive transitions, and preventative approaches to
improve outcomes for children and young people.
14.   Ensure the highest standards of public protection. 
2.2 The high-level performance overview in Appendix 1 presents Members with a summary
of the latest results for each performance indicator within the remit of the Chief Social
Work Officer (Children, Families, Justice, and Integrated Practice). 
2.3 The information in Appendix 1 comprises the following: 
• An ideal direction arrow - this indicates whether a higher or lower figure is the
preferred direction of travel.   
• Measurement unit - for example whether the result is a %, a number, a unit cost
(in £), or a ratio.
• Performance results for the last four financial years (depending on availability of
data) along with the latest year’s target and corresponding RAG status (for
indicators where it is appropriate to set targets).   
• The most recent monthly or quarterly results, along with the corresponding target
and RAG status.  Note the inclusion of this information is dependent on the
measurement frequency of the indicator and availability of data as at the time of
reporting. 
• A trend graph - this captures the direction of travel achieved over the four financial
years and includes the most recent monthly or quarterly results where available.
• Comments - narrative summarising the current position and providing an
explanation for any significant variations in performance.  Where applicable, this
narrative also highlights the effect of the pandemic on service delivery, e.g., any
increase or decrease in the volume of transactions or enquiries processed. 
2.4 A large volume of data supports the high-level performance overview in Appendix 1. 
This is outlined in the latest performance results for Children’s Social Work and
Protection Excel spreadsheet which is available through the following link for
Members to carry out a deep dive and review and scrutinise each performance indicator
further.  The Menu on the second tab of the spreadsheet contains built in hyperlinks
that automatically take the user to a tab for each performance indicator and therefore
provides a useful navigation aid to review the contents of the file. 
• Latest performance results for Children's Social Work and Protection.xlsx
 A higher figure is better
 A lower figure is better
Key to RAG status 
Performance is on target and/or within acceptable thresholds 
Performance does not meet target and is outwith acceptable thresholds 
Performance surpasses the target and exceeds expectations
Page 137 of 167

Page 138

Current context 
2.5 The most recent Children’s Services Plan 2021-23 was published in spring 2021 and
is framed around the foundations of the Promise and the United Nations Convention
on the Rights of the Child (UNCRC). Young people were integral to the development
of the plan with the Promise Development Team leading on the development of the
vision and the Youth Council undertaking a survey focusing on awareness of rights and
leading on identification of actions within the plan to promote and embed these rights. 
2.6  The task groups supporting the delivery of the plan have been reconfigured in line with
the updated priorities with new groups focusing on Voice and Family Support, the
Corporate Parenting Task Group evolving into the Promise Partnership Care and a
refreshed Mental, Health, Wellbeing and Resilience Task Group.  Social Work plays a
key role in each of these strands and the council’s Chief Social Work Officer is lead
officer for the Children’s Service Partnership and chairs the Improving Children’s
Services Group which has oversight of the work of task groups together with the
Scaffolding and People elements of the Children’s Services Plan. 
2.7 Children’s Social Work is uniquely placed to drive and connect the key strands of work
required to support the ambitions of the Promise and the required transformation of
systems, outcomes and experience for children and families. This is due to the key
statutory role social work plays in supporting children and young people and their
families both for children in need and those experiencing or who have experienced care
and the underpinning values of inclusion and empowerment alongside a culture of
partnership working.  This is reflected in two key stands of the Council’s previous
Programme of Work supporting the Plan for North Lanarkshire, Keeping the Promise -
Care and Keeping the Promise – Support for Families, which although led by social
work were built on integrated working across a range of partners. 
2.8 New national guidance for child protection in Scotland published in 2021 also frames
the delivery of the delivery of the children and families social work service. This updated
national guidance places the safeguarding of children and young people within the
wider context of GIRFEC and further emphasises the impact of poverty and the role of
early family support whilst focusing also on emerging harms including extra-familial
harm, the latter a driver for the development of the contextual safeguarding approach
in North Lanarkshire. 
2.9 It is important to note that the latest data reflected in Appendix 1 of this report is for the
period 2020/21 and therefore covers a period heavily impacted by the COVID 19
pandemic.  During this period some areas of statutory activity were suppressed, not
only in North Lanarkshire, but nationally due to a range of factors including some
aspects of harm and need being less visible and the suspension during periods of
highest restrictions of non-emergency business in the children’s hearing and court
systems.  As reflected in the most recent CSWO, demand on children’s social work has
since risen with referrals to children and families social work services growing over the
past two years and in 2021/22 these were 15% higher than in 2018/19. This appears
to reflect an increase in the need for support from children and families within the
community. Although further work is needed to fully understand the picture which sits
behind this, the change is perhaps unsurprising given the evidence that the pandemic
impacted disproportionately on those who already faced the greatest adversities,
including on children’s early development and wider wellbeing, and that families are
now also adversely affected by the emerging cost of living crisis. 
Page 138 of 167

Page 139

Performance highlights 
2.10 1.1% of the North Lanarkshire’s population (aged 0 to 17) are currently looked after by
the local authority. The figures for 2021 show a decrease of 11.9% in the number of
young people looked after compared to 2020.  National average figures over the same
period show 1.3% of children are looked after, with an 8.3% decrease from 2020 to
2021.  A focus on family support, strengths-based practice, and integrated working has
enabled North Lanarkshire to continue to achieve fewer children looked after per head
of population than the national average however it should be noted that the biggest fall
over this period, in both North Lanarkshire and nationally, related to children and young
people experiencing care at home, with this change in part relating to the impact of the
pandemic on children’s hearing system activity. 
2.11 The council continues to show year on year improvement in terms of children ‘looked
after in the community’.  2020/21 figures show that 96.5% of children experiencing care
within North Lanarkshire were looked after in the community in family placements.  This
compares to 90.3% nationally and a family group average of 88.7%.  The council has
consistently performed in the top quartile in Scotland in this indicator and the latest
results show the council to be ranked at 1.  A significant element of this relates to the
role of kinship care. 
2.12 The need for a safe, stable place to live and ongoing secure relationships is central to
a child’s plan.  Latest figures show there are 4.4% of children in NL with more than one
placement in the last year 2020/21 This compares to 16.8% nationally and a family
group average of 13.8%.  The council has consistently performed in the top quartile in
Scotland in this indicator and has remained ranked at 1 for the last 7 years.  This
demonstrates the extent of the council’s commitment to maintaining the need to secure
and maintain attachments in care planning, while recognising that no two cases will be
the same, and each child must be placed in a situation that is appropriate to them. 
Again, however a level of caution must be applied when considering the fall in moves
during this period for children and young people experiencing care in North Lanarkshire
when compared with the previous year as again the pandemic had some impact on
care planning and for a period on non-urgent moves, including to permanent
placements.  The exceptionally low figure for this period may not therefore be
maintained going forward. 
Areas of performance requiring improvement 
2.13 For this period the gross cost of children looked after in residential based services per
child per week was higher in North Lanarkshire than the national and family group
averages. This is an area which will continue to be monitored closely as whilst there
were some pandemic related cost pressures, for example related to additional cover
requirements, and there are also inflationary pressures in this sector, most notably with
respect to external placements, the council remains a relatively low user of external
residential care.  Instead, the primary driver of the jump in costs against this measure
appears to have been a temporary reduction in numbers of young people in residential
care at the specific point of reporting and the associated rise in unit costs.   
2.14  While traditionally the council uses residential care proportionality less than the national
average, there has been a subsequent increase in young people in our own children’s
houses for three main reasons: - the council’s commitment to providing support to
unaccompanied children seeking asylum in a nurturing and safe environment,
openness to taking older young people back into care when they need and ask for it,
and the growth in continuing care. 
Page 139 of 167

Page 140

2.15  Following a drop of a third in numbers of children and young people supported in
external residential placements over 2018-21 the number has plateaued despite a
longer-term commitment to providing support Close to Home. This is due to a range of
factors relating both to demand, complexity of need, and the long-term nature and
supporting relationships associated with some of these placements. Nonetheless it
remains a key priority of the council to ensure increased capacity to support young
people with complex needs within the North Lanarkshire community. 
2.16 This also drives efforts to recruit more in-house foster carers. While there are currently
slightly fewer in children in foster care, the focus on supporting and encouraging young
people to remain with their carers for as long as they need means a continued and
sustained increase in the use of continuing care, with the effect that some foster and
kinship carers are now continuing carers. 
2.17 With respect to child protection, a trend over recent years has been the increase in 
the number of concerns recorded in relation to individual children.  Whilst this  
remains lower than the national average it reflects increased complexity and 
adversities impacting on children and their families.  North Lanarkshire also saw an 
increase in the number of children and young people who were re-registered on the 
Child Protection Register over this period.  Whilst the primary driver of decisions in 
this area will always require to be individual circumstances, this is an area where on 
average performance is below that nationally suggesting further focus is required on 
support for sustainable improvement in family circumstances and safeguarding  
including after de-registration.  This will therefore be an area which is monitored 
closely going forward. 
Next steps 
2.18  As noted in paragraph 1.5, the Strategic Performance Framework is supported by a           
Performance Reporting Schedule.  This sets out the arrangements for service,
statutory, and Strategic Performance Framework reporting to committee.  In this
respect the relevant Committee can expect to receive the following in respect of
Children’s Social Work and Protection areas of work during 2023/24. 
Report Description Committee Committee
cycle
Annual
Report of
the Chief
Social Work
Officer 
The Chief Social Work Officer (CSWO) of
each local authority is required to provide
an annual report and a standard template
for this purpose is issued by the office of
the Chief Social Work Advisor to the
Scottish Government. 
The North Lanarkshire CSWO report
provides information on the delivery of
statutory functions, and performance and
improvement activity across the range of
social work services over the last year.
Education,
Children and
Families
Committee /
Adult Care
and Social
Work
Committee 
Cycle 1 in
2023
reverting
back to
cycle 4 in
2023
annually
thereafter 
Page 140 of 167

Page 141

3. Measures of success 
3.1  Measures of success include:
• Regular oversight and monitoring of performance across the organisation to gain
assurances in terms of governance and accountability.
• Regular review and challenge processes to scrutinise the performance of the
council to ensure effective use of resources and that resources are directed in
accordance with agreed policy and according to priorities, while ensuring sound
decision making and clear accountability for the use of resources in achieving
improved outcomes for service users and the local community.  
• Performance monitoring, management, and reporting arrangements that support
the demonstration of improved performance in local services and outcomes, and
the delivery of Best Value. 
4. Supporting documentation 
4.1 Appendix 1 -  High-level performance overview 
Alison Gordon
Chief Social Work Officer (Children, Families, Justice, and Integrated Practice)
Page 141 of 167

Page 142

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 142 of 167

Page 143

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Managing and monitoring service performance supports the ongoing monitoring of
the service’s risk register.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 143 of 167

Page 144

Appendix 1
Children’s Social Work and Protection
High-level performance overview - as at March 2023 
(Note, some indicators with national comparisons are based on a return that records figures as at July each year, for this reason 2021/22 figures will not be available until later spring 2023.) 
Appendix 1
Page 144 of 167

Page 145

Page 145 of 167

Page 146

Page 146 of 167

Page 147

North Lanarkshire Council
Report
Education, Children and Families Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref: DB / TO’H Date 23/05/23 
Revenue Budget Monitoring Report 
From: Derek Brown (Deputy Chief Executive) 
E-mail: BrownD@northlan.gov.uk  Telephone 01698 302 517 
Executive Summary 
This report provides a summary of the financial performance of the Education, Children
and Families Service for the period 1 April 2022 to 3 March 2023 (Period 12).  The report
highlights the projected outturn position as at 31 March 2023, including explanations of
major variances in accordance with North Lanarkshire Council’s approved Financial
Regulations.   
The Education, Children and Families Service has a Net Revenue Budget of £466.620m
for the 2022/23 financial year. 
Incorporated within the Revenue Budget are approved savings totalling £6.830m.  It is
anticipated that £3.969m (58.11%) of these savings will be realised during the current
financial year. 
The Service is currently forecasting an overspend of £2.613m for the current financial year. 
The overspend is primarily the result of in-year contractual inflation uplifts. 
Recommendations
It is recommended that the Education, Children and Families Committee: 
(1) Review the financial position of the Education, Children and Families revenue budget 
(2) Review the contents of the report 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning  
AGENDA ITEM 11
Page 147 of 167

Page 148

1. Background 
1.1. North Lanarkshire Council’s approved Financial Regulations require Deputy Chief
Executives and Heads of Service to remain within their approved budgetary provision,
and to report all significant deviations - defined as the higher of £100,000 or 5% - within
their budget monitoring reports. Where significant deviations are identified, officers
must provide explanatory commentary, outline the action required to rectify such
deviations and where relevant, must also highlight the impact this has on other budget
headings. 
2. Report 
2.1. Summary of Financial Position 
2.1.1. North Lanarkshire Council approved its General Fund Revenue Budget on 17 February
2022 of which £465.120m (52.4%) represented the approved Net Revenue Budget for
Education, Children and Families. During 2022/23 there has been a net budget
increase of £1.500m to £466.620m following operational realignments between Council
Services.  These movements include incorporation of 2022/23 redeterminations of
£6.428m offset by the transfer of staff groups to the Chief Executives Service including
the Administrative & Finance Assistant (AFA) team and Technicians Service (£2.994m)
along with legislative changes in respect of employers’ national insurance contributions
and other budget realignments (£1.934m). 
2.1.2. The Service is forecasting a net overspend of £2.613m to the end of the financial year. 
Further analysis of major variances is provided within Section 2.2 of this report. 
2.1.3. Included within the net overspend projection are significant, in-year, inflationary cost
pressures.  There are material inflationary pressures linked to increases in utility costs
across the Service’s educational and Active & Creative Communities estate (£4.977m),
coupled with further increases to mainstream and ASN pupil transport contracts
(£3.702m).  As part of the Council’s financial planning process, resources were
previously earmarked following the closure of the 2021/22 annual accounts to help
offset the projected inflationary pressures faced by Services during the current financial
year. The consolidated position summarising in-year inflationary pressures and funding
options across each Service will be presented in the Council’s summary budget
monitoring report. 
2.1.4. In the period up to 3 March 2023, several teacher trade union staff groups had
participated in strike days in relation to pay award uplifts for 2022/23 and 2023/24. At
the close of Period 12 pay deductions totalling £1.847m have been accrued in relation
to action taken on 24 November, 7 December, and 10 / 11 / 19 January. Although this
dispute is now resolved there are outstanding pay deductions for action taken on 28
February and 1 March which are not incorporated within this report. The financial
impact of the teacher’s strike is not included in the Service’s monitoring reports because
school DSM budgets were adjusted on an ongoing and equivalent basis through to the
cessation of the industrial action.  However, similar to Section 2.1.3 above the financial
impact of the strike days is reflected in the Council’s summary budget monitoring report. 
2.1.5. The current 2022/23 budget incorporates £6.830m of savings previously approved by
the Council on 17 February 2022. Further information regarding particularly challenging
savings, along with associated management actions and replacement in-year savings,
are included within this report at Appendix 5. 
Page 148 of 167

Page 149

2.2. Analysis of Significant Variances 
2.2.1. The Service has a total employee budget of £381.843m and currently anticipates a
projected underspend of £7.664m. The underspend reflects actual and projected
vacancies, along with the roll out of finalised HQ, cluster, and school staffing structures. 
2.2.2. Service employee budgets are partly devolved to establishments per the Devolved
School Management (DSM) scheme, with the remaining budgets held at HQ level. 
Under the DSM scheme devolved staffing budgets for teaching and non-teaching posts
are delegated to Head Teacher management.  Establishments receive allocations
based on agreed formulas and distribution methods. Devolved staffing budgets for
financial year 2022/23 total £221.632m. 
2.2.3. The Service is anticipating an overspend of £5.646m within Property Costs
predominantly linked to increased costs in relation to utilities / energy inflation
(£5.293m) along with other minor overspends across the Service (£0.353m). 
2.2.4. The Service is anticipating an underspend of £1.925m within Supplies & Services
primarily due to synergies with external funding, management action and the
curtailment of non-essential expenditure within Cluster / HQ support (£1.469m), Active
and Creative Communities (£0.412m), HQ funded support to the ASN sector
(£0.060m), offset by other minor overspends across the Service (£0.017m). 
2.2.5. The Service is anticipating an overspend of £5.490m within Transport and Plant which
reflects ongoing demand pressures within ASN transport (£2.678m) and increases to
mainstream transport contract rates (£2.861m) along with minor underspends across
the Service (£0.049m). 
2.2.6. The Service is anticipating an underspend of £0.102m within Administration Costs
primarily due to management action and the curtailment of non-essential expenditure. 
2.2.7. The Service is anticipating an overspend of £1.145m within Payments to Other Bodies
primarily in relation to demand led external placements within Family Fostering and
Kinship awards (£0.448m), ASN service provision (£0.652m), along with other minor
overspends across the Service (£0.045m) as outlined in Appendix 3. 
2.2.8. The Service is anticipating an underspend of £0.433m within Transfer Payments in
relation to reduced demand for childrens’ support services and applications for clothing
grants. 
2.2.9. The Service is anticipating an underspend of £0.826m within Other Expenditure
primarily due to the curtailment of non-essential expenditure within Cluster / HQ support
(£0.845m) partially offset by minor overspends within other Service areas (£0.019m). 
2.2.10. The Service is anticipating an under recovery of income of £1.282m in relation to actual
membership and visitor’s fees for Active and Creative Communities (£1.482m) being
lower than the budget target, coupled with reduced cross-boundary ASN placements
within NLC establishments (£0.366m), partially offset by a HRA funding contribution to
the Tackling Poverty Team along with various minor over recoveries across the Service
(£0.567m).  
Page 149 of 167

Page 150

2.3. Earmarked and One-Off Resources 
2.3.1. In finalising North Lanarkshire Council’s annual accounts to 31 March 2022, the
Education, Children and Families Service was given approval to earmark £104.983m
of resources represented by £85.701m (Non-Covid) and £19.282m (Covid) to fund key
projects and initiatives.  Most of this reserve (£54.175m) is earmarked for existing
school building contractual commitments.  Other specific reserves include Pupil Equity
Fund (PEF) carry forwards, Devolved School Management (DSM) carry forwards, and
ring-fenced 1140 Hours grant.  Future monitoring reports will continue to provide
updates on use of these reserves during 2022/23, and future financial years if
applicable, as outlined in Appendix 4. 
2.4. 2022/23 Budget Savings and Growth 
2.4.1. The Council previously approved total savings of £16.484m during 2022/23.  The initial
Education, Children and Families Service savings target for 2022/23 was £6.830m. 
The Service uses a variety of information, records, and processes to monitor
achievement of its approved budget savings. As at Period 12, it is anticipated that
£3.969m (58.11%) of the approved savings target will be realised in the current financial
year as outlined in Appendix 5. 
2.4.2. The unachieved savings of £2.861m have predominantly arisen due to temporary
operational timing delays, the phased introduction of new staffing structures,
consideration of the school academic calendar, and impact of Covid-19.  In year
management action has been taken to address this funding gap and the savings are
expected to be fully achieved during future financial years. 
2.4.3. As part of the Council’s approved General Fund Revenue Budget for 2022/23, the
Education, Children & Families Service were allocated £3.470m towards several one-
off investments. Further information on use of these one-off investment allocations
during 2022/23 is provided in Appendix 6. 
2.5. Management Actions 
2.5.1. Management will continue to review and implement actions through to financial year
end with the aim of minimising the projected overspend position. These actions will
include: 
a) Vacancy management
b) Creating efficiencies through use of grant / external funding
c) Curtailment of non-essential expenditure
d) Application of earmarked reserves to offset one-off cost pressures   
3. Measures of success 
3.1. The Service operates within approved budget resources.     
Page 150 of 167

Page 151

4. Supporting documentation 
4.1. Appendix 1: Objective Analysis
Appendix 2: Subjective Analysis
Appendix 3: Payments to Other Bodies
Appendix 4: Status of Earmarked Reserves
Appendix 5: Savings
Appendix 6: ‘Recover NL’ One-Off Investments 
Derek Brown
Deputy Chief Executive 
Page 151 of 167

Page 152

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
As stated within the main body of the report 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Page 152 of 167

Page 153

Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
The approach outlined in this report supports the Council’s actions in managing
financial sustainability and financial management risks.  Financial pressures and
risks are reviewed on a regular basis by the Service Management Team, CMT and
Committee. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 153 of 167

Page 154

APPENDIX 1
[1] [2] [3] [5] [6] [8] [9] [10]
Early Years 31,110,808 31,110,808 0 31,920,353 31,920,353 0 0.0% 0 Balanced Budget
Primary Schools 123,260,986 123,260,986 0 137,042,002 137,042,002 0 0.0% 0 Balanced Budget
Secondary Schools 120,361,343 120,361,343 0 128,673,940 128,673,940 0 0.0% 0 Balanced Budget
Special Schools 18,768,485 18,768,485 0 20,762,878 20,762,878 0 0.0% 0 Balanced Budget
Education Service Delivery 19,764,164 20,357,849 (593,685) ADV 73,536,780 75,191,566 (1,654,786) ADV (2.3%) 1,155,009 Overspends within transportation costs linked to ASN
service delivery and contract inflation pressures partially
offset by underspends contained within employee costs
budgets.
Children & Families 34,548,073 34,539,828 8,245 FAV 38,918,528 38,898,332 20,196 FAV 0.1% (269,013) Underspends contained with employee cost budgets
partially offset by overspends within Family Placements,
External Fostering & Kinship Placements
Justice Services 19,551 (143,498) 163,049 FAV 73,431 (122,883) 196,314 FAV 267.3% 216,746 Underspends in employee costs due to grant synergies
Active & Creative Communities 8,819,026 9,920,766 (1,101,740) ADV 25,037,035 26,567,127 (1,530,092) ADV (6.1%) (199,202) Overspends linked to increased utitlities costs along with
reduced income in relation to membership fees and site
visitors a result of Covid partially offset by underspends
contained within employee cost budgets.
Employability 6,831,349 6,789,772 41,577 FAV 3,906,759 3,864,032 42,727 FAV 1.1% 12,000 Minor underspend
Community Learning 4,074,867 3,861,356 213,511 FAV 4,765,748 4,457,875 307,873 FAV 6.5% 8,712 Underspends contained within employee cost budgets
with over-recovery of external funding.
Welfare 2,272,919 2,270,745 2,174 FAV 1,982,434 1,977,355 5,079 FAV 0.3% 25,914 Minor underspend
NET EXPENDITURE 369,831,572 371,098,440 (1,266,868) ADV 466,619,888 469,232,577 (2,612,689) ADV (0.6%) 950,166 As stated above
[4] [7]
PROJECTED
OUT-TURN
PROJECTED OUT-TURN
VARIANCE % PERIOD
MOVEMENT ANALYSIS
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Objective Analysis
Period 12 (01 April 2022 - 03 March 2023)
Education, Children & Families
DIVISION OF SERVICE BUDGET TO
DATE
ACTUAL TO
DATE YEAR TO DATE VARIANCE ANNUAL
BUDGET
Page 154 of 167

Page 155

APPENDIX 2
[1] [2] [3] [5] [6] [8] [9] [10]
EMPLOYEE COSTS 332,818,362 326,196,417 6,621,945 FAV 381,843,198 374,179,245 7,663,953 FAV 2.0% 749,635 Underspend primarily due to phasing of external funding
with recruitment reflecting academic not financial year
along with vacancy management.
PROPERTY COSTS 59,407,028 64,298,928 (4,891,900) ADV 66,212,116 71,858,135 (5,646,019) ADV (8.5%) (59,878) Impact of projected increased utitlity costs across the
school estate and Active and Creative Communities and
other minor overspends across the Service.
SUPPLIES & SERVICES 15,606,659 13,794,151 1,812,508 FAV 27,662,942 25,737,844 1,925,098 FAV 7.0% 103,124 Management action, curtailment of non-essential
expenditure and synergies with external funding to
support increased costs and demands within other areas
of the Service
TRANSPORT & PLANT 12,283,794 16,302,252 (4,018,458) ADV 13,937,414 19,427,106 (5,489,692) ADV (39.4%) 23,155 Overspend in relation to ongoing cost pressures linked to
ASN service delivery and observed market increases for
mainstream transport contracts.
ADMINISTRATION COSTS 5,239,697 5,208,521 31,176 FAV 7,615,018 7,513,219 101,799 FAV 1.3% 89,762 Management action, curtailment of non-essential
expenditure and synergies with external funding to
support increased costs and demands within other areas
of the Service
PAYMENTS TO OTHER BODIES 37,211,741 38,173,323 (961,582) ADV 44,801,520 45,946,023 (1,144,504) ADV (2.6%) (152,888) Overspend in relation to external ASN placements and
external fostering / kinship placements.
TRANSFER PAYMENTS 3,882,741 3,524,739 358,002 FAV 4,494,399 4,061,527 432,872 FAV 9.6% 252,872 Underspend in relation to clothing grant applications and
children's support services
CAPITAL FINANCING COSTS 1,385,300 1,385,300 0 43,710,875 43,710,875 0 0.0% 0 Balanced budget
REVENUE FINANCING COSTS 0 0 0 0 0 0 0.0% 0 Balanced budget
OTHER EXPENDITURE 9,740,587 9,042,616 697,971 FAV 23,679,731 22,853,552 826,179 FAV 3.5% 206 Management action, curtailment of non-essential
expenditure and synergies with external funding to
support increased costs and demands within other areas
of the Service
TOTAL EXPENDITURE 477,575,909 477,926,247 (350,338) ADV 613,957,213 615,287,526 (1,330,313) ADV (0.2%) 1,005,988 As stated above
INCOME (107,744,337) (106,827,807) (916,530) ADV (147,337,325) (146,054,949) (1,282,376) ADV 0.9% (55,823) Reduced income in relation to Active and Creative
Communities membership fees and site visitors and
fewer cross-boundary ASN placements within NLC
NET EXPENDITURE 369,831,572 371,098,440 (1,266,868) ADV 466,619,888 469,232,577 (2,612,689) ADV (0.6%) 950,165 As stated above
[4] [7]
PROJECTED
OUT-TURN
PROJECTED OUT-TURN
VARIANCE % PERIOD
MOVEMENT ANALYSIS
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Subjective Analysis
Period 12 (01 April 2022 - 03 March 2023)
Education, Children & Families
CATEGORY BUDGET TO
DATE
ACTUAL TO
DATE YEAR TO DATE VARIANCE ANNUAL
BUDGET
Page 155 of 167

Page 156

APPENDIX 3
[1] [2] [3] [5] [6] [8] [9] [10]
GENERAL PTOBS 8,681,680 8,779,487 (97,807) ADV 11,574,461 11,684,032 (109,572) ADV (1.0%) (36,672) Minor overspends across various PTOB budget heads
ADDITIONAL SUPPORT NEEDS 4,139,265 4,690,599 (551,334) ADV 7,741,252 8,392,829 (651,577) ADV (8.4%) (322,503) Increased costs in relation to out of authority ASN
provision for day placements, residential and secure
accommodation
EARLY YEARS 13,993,995 14,024,394 (30,399) ADV 13,929,454 13,953,104 (23,650) ADV (0.2%) (23,650) Minor overspend
VOLUNTARY ORGANISATIONS 997,515 929,513 68,002 FAV 1,279,484 1,191,411 88,073 FAV 6.9% 98,437 Minor underspend
FAMILY PLACEMENTS 9,339,401 9,689,595 (350,194) ADV 10,054,583 10,502,361 (447,778) ADV (4.5%) 131,500 Impact of increased costs as result of contract inflation
pressures along with continued demand within this
service area
CHILDRENS SERVICES - GENERAL 59,885 59,735 150 FAV 222,286 222,286 0 0.0% 0 Balanced budget
TOTAL EXPENDITURE 37,211,741 38,173,323 (961,582) ADV 44,801,520 45,946,023 (1,144,504) ADV (2.6%) (152,888) As stated above
[4] [7]
PROJECTED
OUT-TURN
PROJECTED OUT-TURN
VARIANCE % PERIOD
MOVEMENT ANALYSIS
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Payments to Other Bodies
Period 12 (01 April 2022 - 03 March 2023)
Education, Children & Families
CATEGORY BUDGET TO
DATE
ACTUAL TO
DATE
YEAR TO DATE
VARIANCE
ANNUAL
BUDGET
Page 156 of 167

Page 157

APPENDIX 4
Value %
Service Specific Earmarked Reserves:
School Carry Forward / Support 5,331,815 0 5,331,815 3,814,990 5,331,815 100.0% 0 0 5,331,815
PEF Carry Forward 5,122,022 0 5,122,022 4,728,020 5,122,022 100.0% 0 0 5,122,022
Seemis Replacement Project 36,399 0 36,399 33,599 36,399 100.0% 0 0 36,399
Early Learning and Childcare 14,248,598 (6,759,000) 7,489,598 5,227,456 7,489,598 100.0% 0 0 7,489,598
CYPMHW Framework 18,881 0 18,881 0 18,881 100.0% 0 0 18,881
Shotts Prison 46,844 0 46,844 0 0 0.0% 46,844 0 0 Spend anticipated over multiple financial years
School Contractual Obligations 54,174,844 (54,174,844) 0 0 0 0.0% 0 0 0
Asylum Seeker 32,333 0 32,333 29,846 32,333 100.0% 0 0 32,333
Whole Family Wellbeing 233,272 0 233,272 0 0 0.0% 233,272 0 0 Spend anticipated over multiple financial years
Student Social Worker Resumption Funding from Universities 21,380 0 21,380 0 0 0.0% 21,380 0 0 Spend anticipated over multiple financial years
ESF Match Funding - Pipeline 406,136 0 406,136 374,895 406,136 100.0% 0 0 406,136
Active & Creative Communities 2,568,303 0 2,568,303 2,568,303 2,568,303 100.0% 0 0 2,568,303
Youth Guarantee Funding 2,908,913 0 2,908,913 856,169 1,454,413 50.0% 1,454,500 0 1,454,413 Spend anticipated over multiple financial years
Legacy Flexible Fund 67,157 0 67,157 67,157 67,157 100.0% 0 0 67,157
DigitalNL Savings 310,825 0 310,825 310,825 310,825 100.0% 0 0 310,825
Roots Opportunity for Growth (LAA Children) 173,208 0 173,208 112,447 173,208 100.0% 0 0 173,208
SUB-TOTAL (Non-Covid) 85,700,930 (60,933,844) 24,767,086 18,123,707 23,011,090 92.9% 1,755,996 0 23,011,090
Service Specific Earmarked Reserves (COVID-19):
Education Services Head Quarters 1,301,807 (134,000) 1,167,807 509,068 1,078,307 92.3% 89,500 0 1,078,307 Spend anticipated over multiple financial years
Education Services Schools 12,075,284 (1,628,888) 10,446,396 5,712,625 5,243,396 50.2% 5,203,000 0 5,243,396 Spend anticipated over multiple financial years
Social Work Services - Criminal Justice 57,341 0 57,341 30,875 57,341 100.0% 0 0 57,341
Active & Creative Communities 702,425 0 702,425 702,425 702,425 100.0% 0 0 702,425
Financial Insecurity / Welfare 4,645,208 0 4,645,208 2,296,074 2,440,958 52.6% 2,204,250 0 2,440,958 Spend anticipated over multiple financial years
Community Renewal Fund 500,000 0 500,000 0 250,000 50.0% 250,000 0 250,000 Spend anticipated over multiple financial years
SUB-TOTAL (Covid) 19,282,065 (1,762,888) 17,519,177 9,251,067 9,772,427 55.8% 7,746,750 0 9,772,427
TOTAL 104,982,995 (62,696,732) 42,286,263 27,374,774 32,783,517 77.5% 9,502,746 0 32,783,517
Commentary Regards UsageDESCRIPTION OF EARMARKED RESOURCE Reserve
Allocation
Adjustments
In Year
Approved
Reserve Total Spend to Date Projected Spend Reserves No
Longer
Required
Reserves
Required In
Year
Reprofiled to
Future Years
FINANCIAL YEAR - 2022/23
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Status of Earmarked Reserves
Period 12 (01 April 2022 - 03 March 2023)
Education, Children & Families
Page 157 of 167

Page 158

APPENDIX 5
£000 £000 £000 £000 £000
Reconfiguration of Secondary School Week to
Facilitate Transformative Practice
626 626 0 0
Reconfiguration of Secondary Management
Structures
474 474 0 0
Management Models for Future Campuses 159 159 0 0
Realignment of Early Years Grant Cash Flow to
Match Expenditure
1,000 1,000 0 0
Residential / Family Placements / Throughcare 600 300 300 Current level of service demand is in
excess of budgetary provision
Management Action within other areas
of the Service to offset savings gap.
300 0
Merger / Rezoning School Catchments 675 175 500 Delay in the implementation of the
associated saving
Approval in place to rephase saving and
delay full-year implementation until
2023/24.  In-year Management Action
within other areas of the Service to
offset savings gap.
500 0
Librarians 238 177 61 Delay in the implementation of the
associated saving
Management Action within other areas
of the Service to offset savings gap.
61 0
Reduce management fees to Culture and
Leisure NL
3,058 1,058 2,000 Delay in the implementation of the
associated saving
In-year allocation of approved
Earmarked Reserve to manage delay in
the implementation of the associated
saving.
2,000 0
TOTAL 6,830 3,969 2,861 As stated above As stated above 2,861 0
58.11% 41.89% 41.89% 0.00%
Delivered Gap Replacement Revised-Gap
DESCRIPTION Value Revised
Savings Gap CommentarySavings Gap
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Savings
Period 12 (01 April 2022 - 03 March 2023)
Education, Children & Families
APPROVED SAVINGS REPLACEMENT SAVING / FUNDING
DESCRIPTION OF APPROVED SAVING Target Value Value
Deliverable Reasons for Savings Gap
Page 158 of 167

Page 159

APPENDIX 6
Value %
Recover NL One-Off Investments
Active & Creative
Communities
Culture, Leisure and
Sport Facility
Improvement Programme
Following the insourcing of culture, leisure and sport
services it is recognised that there is investment required to
ensure customers experience a positive and safe
environment from the Council's facilities which will, in turn,
support increased use of facilities and participation in active 
and creative activities.
1,000,000 1,000,000 1,000,000 100.0% 0 Usage in line budget motion approval
Active & Creative
Communities
Active60 Pass Building on the success of the Council's Active65
membership pass at £50 for the year, continuation for one
more year and extending the scheme to over 60s.
550,000 550,000 550,000 100.0% 0 "
Active & Creative
Communities
Keeping the Promise Free provision of sport and leisure facilities for care
experienced children and young people to promote physical
and mental wellbeing. This would include AccessNL
memberships, family passes to Time  Capsule Waterpark
and nutritional wellbeing support for one year.
300,000 300,000 300,000 100.0% 0 "
Active & Creative
Communities
Active Teens Extending the successful Active Teen programme of free
gym memberships for 11-15 year olds during the working
week for one more year.
300,000 300,000 300,000 100.0% 0 "
Education, Children &
Families
Scottish Attainment
Challenge
Reinstate Scottish Attainment Challenge funding for one
year only.
1,020,000 979,038 1,020,000 100.0% 0 "
Education, Children &
Families
School and Early Years
Clothing Grants
Continuation of enhanced grant value for school aged pupils
and NLC scheme for early years children for one more year.
300,000 300,000 300,000 100.0% 0 "
TOTAL 3,470,000 3,429,038 3,470,000 100.0% 0
Projected Spend Projected
Spend
Variance
Commentary Regards Usage
FINANCIAL YEAR - 2022/23
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Recover NL One-Off Investments
Period 12 (01 April 2022 - 03 March 2023)
Education, Children & Families
DIVISION PRIORITY AREA COUNCIL MOTION AREA
Approved
Investment
Total
Spend to
Date
Page 159 of 167

Page 160

Page 160 of 167

Page 161

North Lanarkshire Council
Report
Education, Children & Families Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref AT/JMcK Date 23/05/23 
Contracts awarded below Committee approval threshold 
From  James McKinstry, Chief Officer (Assets and Procurement)  
Email mckinstryj@northlan.gov.uk   Telephone James McKinstry
07939 281102 
1. Background 
1.1 The Councils General Contract Standing Orders (the ‘GCSOs’) outline financial
approval thresholds for contracts for goods, works and services. Contract awards
above £500,000 for Supplies and Services and above £2,000,000 for Works require
approval by the Committee. These contract awards are considered by the Committee
on a case-by-case basis. 
1.2 Where the value of a contract award is between £50,000 and £500,000 for Supplies
and Services and between £500,000 and £2,000,000 for Works, GCSOs require that
the Chief Officer of Assets and Procurement award these contracts on behalf of the
appropriate Chief Officer. 
1.3 The Chief Officer of Assets and Procurement is required to notify Committee on a
regular basis of any such contracts awarded on behalf of Procuring Service Areas.
Executive Summary 
This report notifies the Committee of the contracts awarded between 1 January 2023 to 31
March 2023. It sets out those contracts awarded with a value below the financial threshold
requiring Committee approval. 
Recommendations
It is recommended that the Education, Children and Families Committee: 
• advised of the Contracts awarded below Committee approval threshold between 1
January 2023 to 31 March 2023 as per the process within the Council’s General
Contract Standing Orders.   
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (18) Ensure our digital transformation is responsive to all people's
needs and enable access to the services they need
AGENDA ITEM 12
Page 161 of 167

Page 162

2. Report 
2.1 The GCSOs require that contracts in excess of £500,000 for supplies and services and
£2,000,000 for works are approved, on a case-by-case basis, by the Committee before
award. 
2.2 The GCSOs require that contracts with a value above £50,000 but less than £500,000
for Supplies and Services and above £500,000 but less than £2,000,000 for Works are
awarded by the Chief Officer of Assets and Procurement on behalf of the appropriate
Chief Officer. 
2.3 The contracts awarded by the Chief Officer of Assets and Procurement that are under
the £500,000 Committee financial approval threshold for Supplies and Services and
£2,000,000 for Works in the period from 1 January 2023 to 31 March 2023 are detailed
in Appendix 1. 
3. Measures of success 
3.1 Contracts support the delivery of Council and service priorities. 
3.2 Appointment of contractors who have suitable experience and capability to deliver the
required supplies, services or works. 
3.3 Contracts awarded by the Council are compliant with GCSOs and procurement
legislation. 
3.4 The Council’s Contract Register is kept updated by services and management
information is comprehensive and accurate. 
3.5 Best Value is both demonstrable and achieved.     
4. Supporting documentation 
4.1 Appendix 1 - Summary of contracts awarded. 
James McKinstry
Chief Officer (Assets and Procurement) 
Page 162 of 167

Page 163

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts have been discussed and agreed with Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Where Financial impacts have been identified, they have been established and 
addressed in each specific Contract Strategy and incorporated into the project.   
The Council’s Procurement Strategy proposes methods of maximising the delivery of 
procurement benefits that could bring improved financial return to the Council and 
the areas wider economy. Certain benefits have a monetary value attached and
these will be monitored on a project-by-project basis.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Where HR impacts have been identified, they have been established and addressed 
in each specific Contract Strategy and incorporated into the project.   
Contracts awarded by the Council are compliant with GCSOs and procurement
legislation.
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Where Legal impacts have been identified, they have been established and 
addressed in each specific Contract Strategy and incorporated into the project.   
Page 163 of 167

Page 164

Contracts awarded by the Council are compliant with GCSOs and procurement
legislation.
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-mailed
to dataprotection@northlan.gov.uk 
Yes ☐ No ☒
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
All contracts listed have been assessed by the Enterprise Architecture Governance
Group (EAGG). 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☒ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Sustainable procurement is one of the key objectives of the Council’s Procurement
Strategy and will have a positive impact, including, embedding sustainable procurement
as business as usual and incorporating community benefits into the Councils contracts.
Supporting local businesses and SMEs through closer working with colleagues in the
Council’s Enterprise department and by making our processes more streamlined and
accessible. 
Where Environmental/Carbon impacts have been identified, they have been 
established and addressed in each specific Contract Strategy and incorporated into 
the project.  
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts, highlighting
where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk
Registers), and how they are managed?
Page 164 of 167

Page 165

Where Risk impacts have been identified, they have been established and 
addressed in each specific Contract Strategy and incorporated into the project. 
Contract award procedures may be susceptible to legal challenge if they are not
discharged in accordance with GCSO and procurement legislation.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does
it relate to healthcare, housing, or education services for in-Service or ex-Service
personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to ensure
there has been appropriate consideration of the particular needs of the Armed Forces
community to make sure that they do not face disadvantage compared to other citizens in
the provision of public services. 
Page 165 of 167

Page 166

APPENDIX 1 – SUMMARY OF BELOW THRESHOLD CONTRACT AWARDS
Contract Description Contract
Award
Date
Contract
Start   
Date
Contract
End Date
Contract
Extension
Contract
Value (inc
extension)
(£s)
Successful
Tenderer 
Supplies
Services
Works
No of
Tenders
Received 
Route*
FF: Solutions for ASN Pupils
(Equipment & Adaptations)
31/01/2023 01/02/2023 31/01/2024 31/01/2026 £480,000.00
Activate for Kids
Limited, James
Leckie Design
Limited, Jenx
Limited T/A
Jiraffe,
SchuchmannLLP
Services 4 FO
Counselling Service for Care
Experienced Young People 15/03/2023 10/04/2023 09/04/2024 09/04/2027 £200,000.00
Therapeutic
Counselling
Services Ltd
Services 5 CO
Bespoke Early Years Agreement 10/03/2023 01/08/2023 31/07/2024 N/A £427,000.00 Kidstore Childcare
Ltd Services 1 *N
Support Services for Domestic
Abuse 2021-25  03/03/2023 01/06/2023 31/05/2024 31/05/2025 £350,000.00 Sacro Services 1 **EXT 
*N - Contract awarded via the use of the Negotiated Tendering Procedure to best value provider as an interim arrangement to ensure continuity
of care.    
** - Contract Extension to incumbent provider delivering best value. Provision for extension made in original contract award reported to a previous
Committee.
Key – Procurement Route
CO -   Contract Open Procedure
CR -   Contract Restricted Procedure
FO -   Framework Open Procedure
FR -   Framework Restricted Procedure
FMCC - Mini Comp Council Framework
FMC3 - Mini Comp 3rd Party Framework
Page 166 of 167

Page 167

DAFC - Direct Award Council Framework
DAF3 -  Direct Award 3rd Party Framework
DAH&SC - Direct Award Health & Social Care Related Services
N -   Negotiated Contract
EXT -  Extension to Contract/Framework 
Page 167 of 167