Page 1

North Lanarkshire Council
Report
Education Children & Families Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  GMcL/JOH Date 23/05/23 
1140 Early Learning & Childcare Expansion Programme Update 
From  Gerard McLaughlin, Chief Officer (Education - North) 
E-mail mclaughling@northlan.gov.uk Telephone 01236 812269 
Executive Summary 
The 1140 Hours Expansion programme for Early Learning and Childcare (ELC) was a
national programme developed in a unique way, in response to specific local
circumstances. 
This report provides Committee with an updated position on the 1140 hours Early Learning
and Childcare (ELC) expansion programme within North Lanarkshire. It reinforces previous
reports which have already been approved by Committee and is based on significant
consultation with stakeholders. In addition, it supports The Plan for North Lanarkshire. 
The report focuses on the capital programme, workforce, and progress in relation to quality.
In addition, it provides a financial update as of period 12.  
Recommendations 
It is recommended that the Education, Children and Families Committee:    
(1) Endorse the 1140 project update.
(2) Endorse the position regarding Heathery Park Family Learning Centre.
(3) Endorse the current position in relation to the budget setting progress and the
impact on the ELC.
(4) Endorse the Negotiated Tender Process for the delivery of ELC.
(5) Endorse the position in regards to the review of the Sustanable Rate for Partner
Providers from August 2023.
(6) Endorse the recommendation to change the start date for 3 year-olds to the
beginning of the term after the child’s 3rd birthday. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (7) Enhance collaborative working to maximise support and ensure
all our children and young people are included, supported, and safe

Page 2

1. Background 
1.1 North Lanarkshire Council (NLC) achieved full delivery of 1140 hours by 30 September
2020, prior to it being legislative from August 2021. 
1.2 The ELC team continues to progress with plans to ensure children and families fully
access the benefits of 1140 hours. 
2. Report 
2.1 Infrastructure Projects 
2.1.1   Table 1 provides an update regarding the outstanding infrastructure projects. 
Table 1
Site Start Date Completion Date
Extensions / Adaptations
Craigneuk FLC February 2023 May 2023
Heatherypark FLC April 2022 TBC 
2.1.2 The outdoor adaptations and roof works at Craigneuk Family Learning Centre have
now been completed however, the roof works have impacted on the internal ceiling,
which now requires to be repaired. In addition, there are further delays with the supply
of materials. It is now anticipated that all works will be complete by mid-May. 
2.1.3 Work continues within Heatherypark FLC and is being closely monitored by A&PS.
Regular meetings are taking place with the contractors to enure progress continues to
be made. 
2.1.4 The Head of Centre and ELC practitioners have been appointed. Plans are in place to
fully resource and set up Heatherypark FLC as soon as an opening date is confirmed. 
2.1.5 The service is delighted to celebrate the opening of Newmains Family Learning Centre,
which is part of the Newmains/St Brigid’s campus. The new purpose-built facility is state
of the art and the staff, children, and families within the Newmains community are
thoroughly enjoying and benefiting from the space and resources the learning
environment offers. 
2.2     Workforce 
2.2.1 Committee will recall NLC employed 536 additional employees to support the
implementation of 1140 hours ELC. Just over 320 positions were temporary (Support
Workers & Keyworkers) and since November 2022 a recruitment process has been
progressed to secure permanency for these positions. There was recognition that due
to the large volume of these positions there was the potential to impact significantly on
the Council’s recruitment team if standard methods were used. As a result, there was
discussion with the Human Resource Business Partnership Manager, Human
Resource Business Partner Team, and Employment Service Centre. It was agreed to
implement a modified process to expedite the exercise.

Page 3

2.2.2 A series of briefing meetings was held to disseminate information via Heads and
detailed email instructions were issued along with Process Maps and Frequently Asked
Questions. Trade Unions were fully involved in agreeing the process and have been
updated periodically. The modified process has three stages: 
• Stage 1 – Professional dialogue took place for like for like vacancies in current
establishment for employees with qualifying service at 4/11/22. 
• Stage 2 - Professional dialogue took place for like for like vacancies in current
establishment for employees with qualifying service at 28/6/23.
• Stage 3 – Residual vacancies recruited by formal internal exercise via standard
method. 
2.2.3 Stage 1 and stage 2 are complete, which has resulted in the recruitment of 145
permanent posts. Stage 3 - recruitment for the remaining 174 part-time/full-time posts
commenced week beginning 10th April 2023. 
2.2.4 It is anticipated that the exercise will be completed by June 2023. Further updates will
be presented to future committees. 
Budget Setting Process 2023/24 
2.2.5 As part of the 3-year budget setting process it was agreed by the Council to review the
Early Learning & Childcare staffing structures and align employee resource to the
staffing model which was approved in 2019.   
2.2.6 A project plan has been developed to ensure that all HR/legal requirements are met in
addressing the realignment of the ELC staffing structures. This will ensure that all
communications, consultations, and risks are managed and enacted at the appropriate
time with the relevant stakeholders.   
2.3       Quality            
Early Learning and Childcare (ELC) Training Calendar 
2.3.1 A full catalogue of training for ELC Practitioners at all levels was established for August
2022 – June 2023. The training sessions offered were in response to need derived from
previous training evaluation forms, scrutiny visits carried out by the Quality Team, Care
Inspectorate and Education Scotland. Training courses are inclusive of both Council
and Partner Providers and sessions are added throughout the year in response to
need. 
2.3.2 To date 1,425 practitioners have attended one or more of the training sessions offered
within the ELC training calendar. The impact of practitioner skills and knowledge gained
is evident in the published Care Inspections from January 2023 - April 2023, where
almost all settings have achieved good or above in Quality Indicator 1.3 - Play and
Learning. In addition, 49 senior leaders are currently undertaking the ELC Leadership
Programme 2022-2023.  A full evaluation of the impact of training and development will
be undertaken in July 2023 to review the impact in relation to improving outcomes for
children and families. This evaluation will assist to inform next steps for the academic
session 2023/2024. Further updates will be provided to future committees. 
2.3.3 All training sessions for session 2022-2023 will continue to be a hybrid model of face-
to-face and virtual sessions.

Page 4

Quality Assurance 
2.3.4 The National Standard sets out what children and families should expect from their
early learning and childcare experience, regardless of where they access their child’s
funded hours. Scottish Government have outlined that children and families should
expect quality services with evaluations that rate good (4) or above. To support
continuous improvement the following activities and actions are undertaken to support
establishments to meet the national standards. 
2.3.5 The Quality Team carry out support visits to work alongside settings to evaluate and
monitor performance, to highlight good practice and provide support and challenge to
make improvements. 
2.3.6 Formal inspections / scrutiny is also a key aspect of the quality framework within ELC.
Education Scotland completes announced inspections using a variety of models. This
includes a full model inspection which covers four Quality Indicators (QI), and a short
model inspection which covers two QI. Some inspections are undertaken by both the
Care Inspectorate and Education. 
2.3.7 In addition, Care Inspectorate carry out unannounced inspections of both nursery
settings and childminders. Reference is made to the newly published quality framework
“A quality framework for day care of children, childminding and school-aged childcare”
(February 2022). The framework supports settings to evaluate their own performance
in addition to providing an independent assurance for care inspectors. 
2.3.8 As guarantors of quality, it is essential all services are fully supported in meeting the
National Standard level 4.  Currently 96% of ELC settings are graded at level 4 and
above.  Appendix 1 provides an overview of the standards of quality across ELC as of
April 2023. 
Head of Centre Induction Programme 
2.3.9 Taking cognisance of the increasing number of new Heads of Centre within the service,
a full and robust Induction programme was rolled out to new and existing Heads
between January 2023 and March 2023. The programme included an induction/review
of the operational requirements essential for effective service delivery linked directly to
education and families’ policies and practice. The programme was supported by
officers from Human Resource, Employee Relations, and Finance. 
2.3.10 The participants strongly agreed that the induction programme provided the necessary
foundation and information to support them in their role. 
Breastfeeding Friendly Scotland Early Learning (BFS EL) Scheme 
2.3.11 North Lanarkshire Council Early Learning and Childcare are committed to working
across communities to change attitudes and create a positive culture around
breastfeeding before any negative attitudes are formed. Links were established with
NHS Lanarkshire and the Scottish Government to achieve the Breastfeeding Friendly
Scotland Early Learning Gold Award. 
2.3.12 The aim of the scheme is to contribute to social and cultural change by promoting an
environment where breastfeeding is seen as the normal way to feed infants and young
children.

Page 5

2.3.13 The objectives are: 
• To promote an environment where breastfeeding is seen as the normal way to feed
infants and young children. 
• To promote informed infant feeding choices and responsive formula feeding.
• To support mothers wishing to breastfeed on our premises.
• To adopt a Breastfeeding and Returning to Work policy to assure pregnant and
breastfeeding employees that, should they wish to, they will be supported to
continue breastfeeding on return to work. 
• To be aware of local services where breastfeeding families can access support and
information and to signpost families to this support if desired. 
2.3.14 In order to achieve the Gold Award status for Early Learning and Childcare, 80% of
ELC establishments must achieve all set criteria to become an accredited
Breastfeeding Friendly setting. This target has been met and exceeded with 85% of our
ELC settings accredited with the BFS EL Gold Award. The remaining 15% are
continuing to take the final steps in achieving the award. 
St Patricks Family Learning Centre, Kilsyth - Global Citizenship 
2.3.15 Following a visit from the Scottish Children and Young People’s Commissioner to St
Patrick’s Family Learning Centre, Kilsyth, the children were asked to contribute to the
Draft General Comment No.26, Children’s Rights, and the environment, with a special
focus on climate change. The children’s thoughts, feelings, ideas, and voices were
captured as part of this process and included in the published document. This was
recognised globally as an amazing opportunity and achievement for all involved,
particularly for the young children of St Patricks Family Learning Centre. Please refer
to Appendix 2 for more detail. 
2.4 Early Learning and Childcare Framework 
2.4.1 Committee will recall that following the conclusion of the ELC tender process, to
establish an ELC Flexible Framework for 2023/2027, 138 providers were identified as
being successful. The Framework will commence on 1 August 2023. 
2.4.2 While the tender exercise has been completed, regarding identifying successful
providers, the process of establishing a sustainable rate is ongoing. Scottish
Government have advised that updated guidance and other support tools will be made
available, which will aid this process. Clarity is being sought re when this will be
available, and engagement will continue with partner providers re setting a sustainable
rate. 
2.4.3 Committee are advised that due to human error, a current partner provider - Kidstore
Nursery, missed the tender process for the 2023/2027 ELC Flexible Framework; it had
always been their intention to reapply. 
2.4.4 Capacity within the geographical area is limited, with the issue exacerbated due to the
changes in legislation for deferred entry, i.e., more children can automatically defer
entry to P1. At the planning stage of 1140 hours, this provider was included when
assessing capacity across North Lanarkshire. 
2.4.5 Approval was sought from the appropriate Chief Officers, and a Negotiated Tender
Process was undertaken, in line with Regulation 33 – Public Contracts (Scotland)
Regulations 2015.

Page 6

2.4.6 Following the required assessment process Kidstore Nursery were successful and
have entered into a Bespoke Early Years Agreement for 1 year (01 August 2023 – 31
July 2024). 
2.4.7 Kidstore Nursery, along with other providers, will have an opportunity to apply to be
part of the Flexible Framework at entry point 2. This will open around September 2023;
successful providers will join the framework on 01 August 2024 for a period of 3 years. 
2.5     Admissions 2023/2024 
2.5.1 Committee are advised that the admission process for session 2023/2024 is ongoing,
with the process nearing completion. 
2.5.2 The application closing date was 10 March, with 3,147 on time applications received
across all settings – local authority and partner providers. 
2.5.3 Table 2 provides a comparison with last year (2022/2023) and shows a 12% increase
in the total number of new on time applications received. 
Table 2 
Local Authority Partner Nurseries Childminders 
2022/2023 2023/2024 2022/2023 2023/2024 2022/2023 2023/2024 
Returners  2516  2492  1012  1185  103  72
New
Applications  1890  2072  852  974  77  101
Cross
Boundary  13  17  52  51  2  6
TOTAL 4419 4581 1916 2210 182 179 
2.5.4 The largest percentage increase in applications is to partner nurseries. If applications
are successful, this will result in increased external partner provider commission
payments going forward.   
2.5.5 In line with previous years, it is anticipated that late applications i.e., those submitted
after 10 March 2023, will be received. Updated data will be provided to members at the
next committee meeting.     
2.6     Cross Boundary 
2.6.1 Committee will recall that a Cross Boundary Protocol is currently in place for children
attending partner provider settings. Cross boundary local authority applications
continue to be progressed in line with NLC admission policy. 
2.6.2 While applications made to local authority establishments continue to be progressed in
line with the admissions policy, applications to partner providers (private/voluntary
nurseries and childminders) will be considered at the West Partnership Cross Boundary
meeting which will take place in mid-May. This meeting takes place at the latter stage
of the process due to those authorities involved operating to differing timescales re their
allocation of placements. The meeting allows for approval to be sought from those
authorities that applicants reside in.

Page 7

2.6.3 The cross boundary costs to 3rd March 2023 (Period 12) were £311k. This figure will
increase further as authorities/partners finalise their charges through to financial year
end. 
2.7     Deferred Entry 
2.7.1 Committee will recall that considering the forthcoming changes in legislation – effective
from 1 August 2023, it was anticipated that the number of automatic deferrals for
session 2023/2024, would increase in comparison to those in session 2022/2023. 
2.7.2 The change in legislation sees automatic deferrals being available from the day after
the term starts in August until the last day in February. Previously automatic deferrals
were available for January and February birthdays only. 
2.7.3 Table 3 outlines the increase in automatic deferrals – 88%, following the change in
legislation. Overall deferrals – automatic and discretionary, have increased circa 41%. 
Table 3
2022/2023 2023/2024
Automatic Discretionary Automatic Discretionary
Jan – Feb March – Aug Aug – Feb March - Aug
207 125 389 79
Total: 332 Total: 468 
2.7.4 Table 4 provides a breakdown of the number of deferred entry placements to P1 across
local authority and partner providers. 
Table 4 
Aug -Dec Jan - Feb March - Aug
2023/2024 Local Authority Deferrals 105 175 73
2023/2024 Partner Provider Deferrals 36 64 6
2023/2024 Split Placement Deferral  4 4 0
2023/2024 Not Attending a ELC Setting  0 1 0 
2.8      External Partner Provider Commission Payments 
2.8.1 Table 5 provides an overview of Partner Provider Commission Payments, from April
2022 to period 12. 
Table 5
External Commission Payments 
April to July August to March Total
3-5 Payments 1140
hours
£4.572m £8.345m £12.917m
Eligible 2 Payments
1140 hours
£0.328m £0.534 £0.862m
Meal Payments 2-5-
year-olds
£0.316m £0.624 £0.940m                                                                                            
Total £14.719m

Page 8

2.9     Healthy Milk & Snack Scheme 
2.9.1 Committee will recall that there is a requirement for providers to re-register for the
Healthy Milk and Snack Scheme on an annual basis. In doing so this allows them to
update the figures re children in their care. 
2.9.2 Within the current session – 2022/2023, 79 partner providers have registered: 31 from
Partner Nurseries and 48 from Childminders. 
2.9.3 The registration process has now re-opened – April 2023, allowing new providers to
join the scheme. Further updates will be provided to committee. 
2.10     Review of the Sustainable Rate 2023/2024 
2.10.1 Under Funding Follows the Child, Councils are required to set an hourly rate that is
paid to partners providers in the private and voluntary sectors, including childminders,
to deliver the funded entitlement. Councils are also required to review the rate to ensure
it is sustainable and reflects national policy priorities, including funding to enable
payment of the Scottish Living Wage (SLW) to all childcare workers delivering the
funded entitlement. The SLW was increased from £9.90 to £10.90 per hour in
September 2022 and there is an expectation from Scottish Government that all partner
providers are committed to paying the SLW from May 2023. 
2.10.2 Committee will recall in November 2022 a reviewed hourly rate to deliver the funded
entitlement in partner providers was agreed and back dated to August 2022. Table 6
provides an overview of the hourly rates for funded entitlement in partner providers
since the inception of 1140 hours. 
Table 6 
3–5-year-olds (hourly
rate)
2-3-year-olds (hourly rate)
2019-2020 £5.55 £5.80
2020-2021 £5.55 £5.80
2021-2022 £5.55 £5.80
2022-2023 £5.77 £6.03   
2.10.3 The service previously reported that an annual review of the hourly rate would take
place, albeit this may not result in an increase.  This process will involves taking
account of national guidance and consistent approaches and methodology
implemented across the West Partnership.  Further updates will be provided to
committee, 
2.11    Change to 3 Year Olds Start Date 
2.11.1 Start dates, for children taking up their ELC placement, under the 2014 Order, state
that all 3-year-olds are eligible for funded early learning and childcare from the
beginning of the first term after the child's 3rd birthday.  Please refer to the link below
for details.
Starting and stopping dates for eligibility - Early learning and childcare: statutory
guidance - July 2021 - gov.scot (www.gov.scot)

Page 9

2.11.2 Councils can use their discretionary powers under section 1(1C) of the 1980 Act, to
provide funded early learning and childcare to 3-year-olds earlier than the statutory
start dates. 
2.11.3 Currently within NLC 3-year-olds taking up an early learning and childcare placement,
can do so the day after their 3rd birthday.  This start date falls out with the statutory
guidance, allowing children to commence their placement early. 
2.11.4 From academic session 2023/2024 the service will continue to offer early access to
funded provision; however committee are asked to endorse the change to 3-year-olds
start dates from the current position (day after the child’s 3rd birthday) to the beginning
of the first term after the child’s 3rd birthday from August 2024.  This is to enable the
service to accrue potential efficiencies to support the anticipated increase of deferred
A further paper will be brought to a future committee with a full breakdown of any
efficiencies. 
2.11.5 Committee are aware that from August 2023 the statutory entitlement to defer entry to
primary 1 has been extended from mid-August to the end of February. This change in
legislation ensures all children will continue to have access to two years plus of ELC
funded provision. 
2.11.6 The service will ensure this information is communicated effectively with parents during
the academic session 2023/2024 in preparation for the change from August 2024. In
addition, any parent choosing to access their child’s placement earlier than the
beginning of the term after their 3rd birthday will have the option to pay for this
additionality. 
2.11.7 Communications 
2.11.8 The service continues to meet regularly with both Care Inspectorate and Trade Unions
regarding delivery of ELC provision. Relations continue to be collaborative and positive. 
2.11.9 The Corporate Communications team continue to support ELC with all communications
to support the delivery of 1140 hours. Update deferred entry information has been
posted on the ELC website and communications has been prepared to support the
2023/2024 admissions process. 
2.11.10 Childminding week is a National annual event takes place week beginning 8 May 2023.
The service has organised a celebration on 10 May 2023 to recognise the support in
place for children and families from childminders across NLC (Appendix 03).  Further
updates will be presented to Committee. 
2.12    Financial Update                 
Revenue Budget 2022/23
2.12.1 The gross expenditure budget for ELC in 2022/23 is £61.321m which is partly offset by
the ELC Expansion Grant of £34.842m. The projected outturn for 2022/23 as of 3 March
2023 (Period 12) is a net underspend of £0.465m. 
Capital Budget 2022/23 
2.12.2 Since inception, the ELC Expansion (1140 Hours) Capital Programme has spanned
several financial years cumulating in new Family Learning Centres and renovations of
existing establishments across the authority.

Page 10

2.12.3 The Enterprise & Communities 2022/23 capital programme of £157.168m was
approved at Policy & Strategy Committee on 17 March 2022. The 2022/23 programme
has since been increase by £21.479m relating to carry forwards from 2021/22
(£5.796m) and additional external funding (£15.683m). Included in the approved
2022/23 capital programme, for Enterprise & Communities, is £2.192m regarding ELC
Expansion (1140 Hours). 
2.12.4 As at Period 12, the Service is projecting an overspend of £0.010m in relation to the
associated ELC Expansion (1140 Hours) capital workstreams. 
In addition, there was £0.537m of budget set aside for Covid The final bill has been
agreed as £0.391m. This underspend of £0.146m is included within the current year
projection, so if there is any clawback of this budget, then the 1140 capital spend
position could alter. 
3. Measures of success 
3.1  Children have access to funded entitlement of 1140 hours of ELC.   
4. Supporting documentation 
4.1       Appendix 1: ELC Standards of Quality
4.2       Appendix 2: St Patricks Family Learning Centre Global Citizenship
4.3       Appendix 3: Childminding Week 
Gerard McLaughlin
Chief Officer (Education - North)

Page 11

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The strategy of the service, as approved by the Education Corporate Management
Team (November 2017), is to positively target families who live in SIMD areas 1 – 4
to address disadvantage and barriers to success.  Consideration has also been
given to ensure that there is a mix of services within localities to support
accessibility and parental demand.   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐     
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
ELC expenditure for financial year 2022/23 will be contained within the available
budget provision. During the preparation of the 2023/24 Early Years budgets the
Service will critically review the pertinent issues highlighted in this report to ensure
activity can similarly be maintained within the available overall funding envelope.   
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Support in place from HR to support the ELC recruitment
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Consultations are ongoing with Legal regarding the the position with the ELC
procurement framework.
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?

Page 12

Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The paper contains information regarding the delay of the ELC admissions
process, which may impact on the level of enquiries the ELC website will receive. 
A statement has been produced to keep parents/carers up to date.
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Delays to the admissions process 2023/2024 could impact on the timeline to
secure placements for all eligible 2-5-year-olds by August 2023. This will impact on
the statutory 1140 hours entitlement for children and families.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.

Page 13

APPENDIX 1
Care Inspectorate information – April 2023 
ELC settings:
• 23 Family Learning
• 79 Nursery Classes
• 41 Partner Nurseries
• 121 Childminders
The pie charts below outline the percentage of settings who are meeting the national
standard and above (level 4,5 &,6) and those who require additional support (level 2 & 3) 
22%
44%
33%
1%
Family Learning Centres Inspection
Outcomes
Excellent Very Good Good Adequate
4%
50%
45%
1%
Nursery Class Inspection Outcomes
Excellent Very Good Good Adequate

Page 14

2%
37%
54%
7%
Partner Nursery Inspection Outcomes
Excellent Very Good Good Adequate
3%
58%
37%
2%
Childninder Inspection Outcomes
Ecellent Very Good Good Adequate

Page 15

The column chart below provides an overview of the percentage of all ELC settings care
inspectorate gradings: excellent, very good, good and adequate. 
22
44
33
14
50
45
12
37
54
7
3
58
37
2
0
10
20
30
40
50
60
70
Excellent Very Good Good Adequate
ELC Settings Inspection Outcomes (Total %)
Family Learning Centre Nursery Class Partner Nursery Childminders

Page 16

APPENDIX 2
St Patricks Family Learning Centre Global Citizenship
Following a very successful visit last summer, the children and staff of St Patrick’s family
learning centre, along with some Primary 1 children from the neighbouring school, were asked
to contribute towards the Draft General Comment No. 26, Children’s
Rights, and the Environment with a Special Focus on Climate Change
Submission, of the Children and Young People’s Commissioner Scotland
(CYPCS) February 2023. During the first visit, the CYPCS team were
inspired by the ways in which children in the earliest stages of education
had their voices listened to and their views gathered and asked if they
could work with them to help contribute towards the General Comment.
Bruce Adamson, Children and Young People’s Commissioner spent 2
days in St Patrick’s family learning centre with Kevin Browne-MacLeod,
policy advisor. They explored how younger children can contribute to
children’s rights and the environment through a range of consultation
activities as part of General Comment 26. 
Three joint sessions were planned in the nursery which involved an environmental walk, small
group discussion, stories, and STEM activities.
Every member of staff in the setting had an opportunity to meet with the Commissioner and
his team to discuss the role of CYPCS, impact and links to the UNCRC.
They were impressed by the brilliant work that is happening in the family learning centre. Bruce
shared this on his Twitter page, and it reached the United Nations in Geneva who have
commented on the excellent practice in this setting.
This was an opportunity to share some of our fantastic work in ELC and beyond, as we took
the opportunity to showcase everything we do in terms of working with families, alleviating
issues around poverty and some of the wider achievements in other sectors within the North
Lanarkshire Council.
Link for further information:
https://childrightsenvironment.org/about/#:~:text=The%20Committee%20is%20creating%20a
,do%20to%20uphold%20these%20rights.

Page 17

APPENDIX 3 
Childminding week 2023
One of the Quality Officer and SCMA worked in partnership to celebration the North
Lanarkshire childminders for Childminding week 2023. This was a week-long celebration of
Childminding followed by the SCMA conference on Saturday 13 May in the Morning of which
all CMs had the opportunity to attend.
The event was held at Summerlee Heritage Centre, and there were many planned activities,
including operation play outdoors presented by specialist in large loose parts play.  The
children had excellent opportunities to build, explore and create with lots of different loose
parts.
Active Schools organised potted sports, ACEs, NHS Lanarkshire (vitamins and Breastfeeding),
organised face painting, bookbug sessions, Ziggy from Road Safety, and a treasure hunt.