Revenue Budget Monitoring Report Period 10 - 1 April 2022 to 6 January 2023

North Lanarkshire Council · 28 February 2023
Back to Education, Children and Families Committee — 28 February 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

North Lanarkshire Council
Report
Education, Children and Families Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref: DB / TO’H Date 28/02/23 
Revenue Budget Monitoring Report 
From: Derek Brown (Deputy Chief Executive) 
E-mail: BrownD@northlan.gov.uk  Telephone 01698 302 517 
Executive Summary 
This report provides a summary of the financial performance of the Education, Children
and Families Service for the period 1 April 2022 to 6 January 2023 (Period 10).  The report
highlights the projected outturn position as at 31 March 2023, including explanations of
major variances in accordance with North Lanarkshire Council’s approved Financial
Regulations.   
The Education, Children and Families Service has a Net Revenue Budget of £460.192m
for the 2022/23 financial year. 
Incorporated within the Revenue Budget are approved savings totalling £6.830m.  It is
anticipated that £3.969m (58.11%) of these savings will be realised during the current
financial year. 
The Service is currently forecasting an overspend of £3.563m for the current financial year. 
The overspend is primarily the result of in-year contractual inflation uplifts. 
Recommendations
It is recommended that the Education, Children and Families Committee: 
(1) Review the financial position of the Education, Children and Families revenue budget 
(2) Review the contents of the report 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning

Page 2

1. Background 
1.1. North Lanarkshire Council’s approved Financial Regulations require Deputy Chief
Executives and Heads of Service to remain within their approved budgetary provision,
and to report all significant deviations - defined as the higher of £100,000 or 5% - within
their budget monitoring reports. Where significant deviations are identified, officers
must provide explanatory commentary, outline the action required to rectify such
deviations and where relevant, must also highlight the impact this has on other budget
headings. 
2. Report 
2.1. Summary of Financial Position 
2.1.1. North Lanarkshire Council approved its General Fund Revenue Budget on 17 February
2022 of which £465.120m (52.4%) represented the approved Net Revenue Budget for
Education, Children and Families. During 2022/23 there has been a net budget
reduction of £4.928m to £460.192m following operational realignments between
Council Services.  These movements include the transfer of staff groups to the Chief
Executives Service including the Administrative & Finance Assistant (AFA) team and
Technicians Service (£2.994m) along with legislative changes in respect of employers’
national insurance contributions (£1.859m). 
2.1.2. The Service is forecasting a net overspend of £3.563m to the end of the financial year. 
Further analysis of major variances is provided within Section 2.2 of this report. 
2.1.3. Included within the net overspend projection are significant, in-year, inflationary cost
pressures.  There are material inflationary pressures linked to increases in utility costs
across the Service’s educational and Active & Creative Communities estate (£4.983m),
coupled with further increases to mainstream and ASN pupil transport contracts
(£3.651m).  As part of the Council’s financial planning process, resources were
previously earmarked following the closure of the 2021/22 annual accounts to help
offset the projected inflationary pressures faced by Services during the current financial
year. The consolidated position summarising in-year inflationary pressures and funding
options across each Service will be presented in the Council’s summary budget
monitoring report. 
2.1.4. In the period up to 6 January 2023 several teacher trade union staff groups had
participated in strike days and this industrial dispute remains unresolved. At the close
of Period 10 pay deductions totalling £0.657m have been accrued in relation to action
taken on 24 November and 7 December 2022. The impact of the teacher’s strike is not
included in this report because school DSM budgets will be adjusted on an ongoing
and equivalent basis through to the cessation of the industrial action.  However, similar
to Section 2.1.3 above the financial impact of the strike days will be reflected in the
Council’s summary budget monitoring report. 
2.1.5. The current 2022/23 budget incorporates £6.830m of savings previously approved by
the Council on 17 February 2022. Further information regarding particularly challenging
savings, along with associated management actions and replacement in-year savings,
are included within this report at Appendix 5.

Page 3

2.2. Analysis of Significant Variances 
2.2.1. The Service has a total employee budget of £374.081m and currently anticipates a
projected underspend of £6.914m. The underspend reflects actual and projected
vacancies, along with the roll out of finalised HQ, cluster, and school staffing structures. 
2.2.2. Service employee budgets are partly devolved to establishments per the Devolved
School Management (DSM) scheme, with the remaining budgets held at HQ level. 
Under the DSM scheme devolved staffing budgets for teaching and non-teaching posts
are delegated to Head Teacher management.  Establishments receive allocations
based on agreed formulas and distribution methods. Devolved staffing budgets for
financial year 2022/23 total £217.036m. 
2.2.3. The Service is anticipating an overspend of £5.586m within Property Costs
predominantly linked to increased costs in relation to utilities / energy inflation
(£5.300m) along with other minor overspends across the Service (£0.286m). 
2.2.4. The Service is anticipating an underspend of £1.822m within Supplies & Services
primarily due to synergies with external funding, management action and the
curtailment of non-essential expenditure within Cluster / HQ support (£1.264m), Active
and Creative Communities (£0.439m), HQ funded support to the ASN sector
(£0.134m), offset by other minor overspends across the Service (£0.015m). 
2.2.5. The Service is anticipating an overspend of £5.513m within Transport and Plant which
reflects ongoing demand pressures within ASN transport (£2.678m) and increases to
mainstream transport contract rates (£2.810m) along with minor overspends across the
Service (£0.025m). 
2.2.6. The Service is anticipating an underspend of £0.012m within Administration Costs
primarily due to management action and the curtailment of non-essential expenditure. 
2.2.7. The Service is anticipating an overspend of £0.992m within Payments to Other Bodies
primarily in relation to demand led external placements within Family Fostering and
Kinship awards (£0.579m), ASN service provision (£0.329m), along with other minor
overspends across the Service (£0.083m) as outlined in Appendix 3. 
2.2.8. The Service is anticipating an underspend of £0.180m within Transfer Payments in
relation to reduced demand for childrens’ support services and applications for clothing
grants. 
2.2.9. The Service is anticipating an underspend of £0.826m within Other Expenditure
primarily due to the curtailment of non-essential expenditure within Cluster / HQ support
(£0.845m) partially offset by minor overspends within other Service areas (£0.019m). 
2.2.10. The Service is anticipating an under recovery of income of £1.227m in relation to actual
membership and visitor’s fees for Active and Creative Communities (£1.482m) being
lower than the budget target, coupled with reduced cross-boundary ASN placements
within NLC establishments (£0.366m), partially offset by a HRA funding contribution to
the Tackling Poverty Team along with various minor over recoveries across the Service
(£0.622m).

Page 4

2.3. Earmarked and One-Off Resources 
2.3.1. In finalising North Lanarkshire Council’s annual accounts to 31 March 2022, the
Education, Children and Families Service was given approval to earmark £104.983m
of resources represented by £85.701m (Non-Covid) and £19.282m (Covid) to fund key
projects and initiatives.  Most of this reserve (£54.175m) is earmarked for existing
school building contractual commitments.  Other specific reserves include Pupil Equity
Fund (PEF) carry forwards, Devolved School Management (DSM) carry forwards, and
ring-fenced 1140 Hours grant.  Future monitoring reports will provide updates on use
of these reserves during 2022/23 as outlined in Appendix 4. 
2.4. 2022/23 Budget Savings and Growth 
2.4.1. The Council previously approved total savings of £16.484m during 2022/23.  The initial
Education, Children and Families Service savings target for 2022/23 was £6.830m. 
The Service uses a variety of information, records, and processes to monitor
achievement of its approved budget savings. As at Period 10, it is anticipated that
£3.969m (58.11%) of the approved savings target will be realised in the current financial
year as outlined in Appendix 5. 
2.4.2. The unachieved savings of £2.861m have predominantly arisen due to temporary
operational timing delays, the phased introduction of new staffing structures,
consideration of the school academic calendar, and impact of Covid-19.  In year
management action has been taken to address this funding gap and the savings are
expected to be fully achieved during future financial years. 
2.4.3. As part of the Council’s approved General Fund Revenue Budget for 2022/23, the
Education, Children & Families Service were allocated £3.470m towards several one-
off investments. Further information on use of these one-off investment allocations
during 2022/23 is provided in Appendix 6. 
2.5. Management Actions 
2.5.1. Management will continue to review and implement actions through to financial year
end with the aim of minimising the projected overspend position. These actions will
include: 
a) Vacancy management
b) Creating efficiencies through use of grant / external funding
c) Curtailment of non-essential expenditure
d) Application of earmarked reserves to offset one-off cost pressures   
3. Measures of success 
3.1. The Service operates within approved budget resources.

Page 5

4. Supporting documentation 
4.1. Appendix 1: Objective Analysis
Appendix 2: Subjective Analysis
Appendix 3: Payments to Other Bodies
Appendix 4: Status of Earmarked Reserves
Appendix 5: Savings
Appendix 6: ‘Recover NL’ One-Off Investments 
Derek Brown
Deputy Chief Executive

Page 6

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
As stated within the main body of the report 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?

Page 7

Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
The approach outlined in this report supports the Council’s actions in managing
financial sustainability and financial management risks.  Financial pressures and
risks are reviewed on a regular basis by the Service Management Team, CMT and
Committee. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.

Page 8

APPENDIX 1
[1] [2] [3] [5] [6] [8] [9] [10]
Early Years 25,522,277 25,522,277 0 31,807,284 31,807,284 0 0.0% 0 Balanced Budget
Primary Schools 92,377,292 92,377,292 0 136,209,480 136,209,480 0 0.0% 0 Balanced Budget
Secondary Schools 91,890,348 91,890,348 0 127,846,098 127,846,098 0 0.0% 0 Balanced Budget
Special Schools 15,163,051 15,163,051 0 20,651,426 20,651,426 0 0.0% 0 Balanced Budget
Education Service Delivery 16,001,265 17,884,986 (1,883,721) ADV 71,465,354 74,275,149 (2,809,795) ADV (3.9%) 1,800,797 Overspends within transportation costs linked to ASN
service delivery and contract inflation pressures
partially offset by underspends contained within
employee costs budgets.
Children & Families 26,159,282 25,969,595 189,687 FAV 36,567,528 36,278,319 289,209 FAV 0.8% (617,618) Underspends contained with employee cost budgets
partially offset by overspends within Family
Placements, External Fostering & Kinship
Placements
Justice Services (105,797) (90,080) (15,717) ADV 73,431 93,863 (20,432) ADV (27.8%) (328,247) Minor overspend
Active & Creative Communities 8,636,851 9,791,939 (1,155,088) ADV 25,037,035 26,367,925 (1,330,890) ADV (5.3%) (370,469) Overspends linked to increased utitlities costs along
with reduced income in relation to membership fees
and site visitors a result of Covid partially offset by
underspends contained within employee cost
budgets.
Employability 5,545,624 5,515,937 29,687 FAV 3,906,759 3,876,032 30,727 FAV 0.8% 45,609 Minor underspend
Community Learning 3,706,268 3,579,751 126,517 FAV 4,645,059 4,345,898 299,161 FAV 6.4% 517,899 Underspends contained within employee cost
budgets with over-recovery of external funding.
Welfare 1,616,015 1,624,917 (8,902) ADV 1,982,435 2,003,270 (20,835) ADV (1.1%) 533,169 Minor overspend
NET EXPENDITURE 286,512,476 289,230,013 (2,717,537) ADV 460,191,889 463,754,744 (3,562,855) ADV (0.8%) 1,581,140 As stated above
DIVISION OF SERVICE BUDGET TO
DATE
ACTUAL TO
DATE YEAR TO DATE VARIANCE ANNUAL
BUDGET
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Objective Analysis
Period 10 (01 April 2022 - 06 January 2023)
Education, Children & Families
[4] [7]
PROJECTED
OUT-TURN
PROJECTED OUT-TURN
VARIANCE % PERIOD
MOVEMENT ANALYSIS

Page 9

APPENDIX 2
[1] [2] [3] [5] [6] [8] [9] [10]
EMPLOYEE COSTS 277,200,813 270,414,503 6,786,310 FAV 374,081,276 367,166,958 6,914,318 FAV 1.9% 2,059,149 Underspend primarily due to phasing of external
funding with recruitment reflecting academic not
financial year along with vacancy management.
PROPERTY COSTS 32,021,028 36,543,642 (4,522,614) ADV 66,191,398 71,777,539 (5,586,141) ADV (8.4%) 22,349 Impact of projected increased utitlity costs across the
school estate and Active and Creative Communities
and other minor overspends across the Service.
SUPPLIES & SERVICES 10,584,431 10,089,507 494,924 FAV 26,416,538 24,594,564 1,821,974 FAV 6.9% 267,884 Management action, curtailment of non-essential
expenditure and synergies with external funding to
support increased costs and demands within other
areas of the Service
TRANSPORT & PLANT 8,458,302 12,592,369 (4,134,067) ADV 13,902,719 19,415,566 (5,512,847) ADV (39.7%) (119,121) Overspend in relation to ongoing cost pressures
linked to ASN service delivery and observed market
increases for mainstream transport contracts.
ADMINISTRATION COSTS 3,394,906 3,348,401 46,505 FAV 7,139,355 7,127,318 12,037 FAV 0.2% (358,448) Management action, curtailment of non-essential
expenditure and synergies with external funding to
support increased costs and demands within other
areas of the Service
PAYMENTS TO OTHER BODIES 29,392,956 30,150,571 (757,615) ADV 43,126,125 44,117,741 (991,616) ADV (2.3%) 133,977 Overspend in relation to external ASN placements
and external fostering / kinship placements.
TRANSFER PAYMENTS 2,938,359 2,831,264 107,095 FAV 4,492,512 4,312,512 180,000 FAV 4.0% 180,000 Underspend in relation to clothing grant applications
and children's support services
CAPITAL FINANCING COSTS 1,385,300 1,385,300 0 43,710,875 43,710,875 0 0.0% 0 Balanced budget
REVENUE FINANCING COSTS 0 0 0 0 0 0 0.0% 0 Balanced budget
OTHER EXPENDITURE 6,181,587 6,201,991 (20,404) ADV 27,077,490 26,251,517 825,973 FAV 3.1% (1,161,934) Management action, curtailment of non-essential
expenditure and synergies with external funding to
support increased costs and demands within other
areas of the Service
TOTAL EXPENDITURE 371,557,682 373,557,548 (1,999,866) ADV 606,138,288 608,474,590 (2,336,302) ADV (0.4%) 1,023,856 As stated above
INCOME (85,045,206) (84,327,535) (717,671) ADV (145,946,399) (144,719,846) (1,226,553) ADV 0.8% 557,284 Reduced income in relation to Active and Creative
Communities membership fees and site visitors and
fewer cross-boundary ASN placements within NLC
NET EXPENDITURE 286,512,476 289,230,013 (2,717,537) ADV 460,191,889 463,754,744 (3,562,855) ADV (0.8%) 1,581,140 As stated above
CATEGORY BUDGET TO
DATE
ACTUAL TO
DATE YEAR TO DATE VARIANCE ANNUAL
BUDGET
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Subjective Analysis
Period 10 (01 April 2022 - 06 January 2023)
Education, Children & Families
[4] [7]
PROJECTED
OUT-TURN
PROJECTED OUT-TURN
VARIANCE % PERIOD
MOVEMENT ANALYSIS

Page 10

APPENDIX 3
[1] [2] [3] [5] [6] [8] [9] [10]
GENERAL PTOBS 6,155,221 6,198,871 (43,651) ADV 10,101,273 10,174,173 (72,900) ADV (0.7%) (3,797) Minor overspend
ADDITIONAL SUPPORT NEEDS 3,468,217 3,721,352 (253,134) ADV 7,738,919 8,067,993 (329,074) ADV (4.3%) 413,869 Increased costs in relation to out of authority ASN
provision for day placements, residential and secure
accommodation
EARLY YEARS 11,531,766 11,531,766 0 13,894,454 13,894,454 0 0.0% 0 Balanced budget
VOLUNTARY ORGANISATIONS 663,451 669,767 (6,316) ADV 1,114,610 1,124,974 (10,364) ADV (0.9%) 0 Minor overspend
FAMILY PLACEMENTS 7,522,394 7,976,909 (454,515) ADV 10,054,583 10,633,861 (579,278) ADV (5.8%) (276,095) Impact of increased costs as result of contract
inflation pressures along with continued demand
within this service area
CHILDRENS SERVICES - GENERAL 51,907 51,907 0 222,286 222,286 0 0.0% 0 Balanced budget
TOTAL EXPENDITURE 29,392,956 30,150,571 (757,616) ADV 43,126,125 44,117,741 (991,616) ADV (2.3%) 133,977 As stated above
[4] [7]
PROJECTED
OUT-TURN
PROJECTED OUT-TURN
VARIANCE % PERIOD
MOVEMENT ANALYSIS
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Payments to Other Bodies
Period 10 (01 April 2022 - 06 January 2023)
Education, Children & Families
CATEGORY BUDGET TO
DATE
ACTUAL TO
DATE
YEAR TO DATE
VARIANCE
ANNUAL
BUDGET

Page 11

APPENDIX 4
Value %
Service Specific Earmarked Reserves:
School Carry Forward / Support 5,331,815 0 5,331,815 3,285,329 5,331,815 100.0% 0 5,331,815
PEF Carry Forward 5,122,022 0 5,122,022 3,940,017 5,122,022 100.0% 0 5,122,022
Seemis Replacement Project 36,399 0 36,399 27,999 36,399 100.0% 0 36,399
Early Learning and Childcare 14,248,598 (6,759,000) 7,489,598 5,227,456 7,489,598 100.0% 0 7,489,598
CYPMHW Framework 18,881 0 18,881 0 18,881 100.0% 0 18,881
Shotts Prison 46,844 0 46,844 0 46,844 100.0% 0 46,844
School Contractual Obligations 54,174,844 (54,174,844) 0 0 0 0.0% 0 0
Asylum Seeker 32,333 0 32,333 24,872 32,333 100.0% 0 32,333
Whole Family Wellbeing 233,272 0 233,272 0 233,272 100.0% 0 233,272
Student Social Worker Resumption Funding from Universities 21,380 0 21,380 0 21,380 100.0% 0 21,380
ESF Match Funding - Pipeline 406,136 0 406,136 312,412 406,136 100.0% 0 406,136
Active & Creative Communities 2,568,303 0 2,568,303 2,073,078 2,568,303 100.0% 0 2,568,303
Youth Guarantee Funding 2,908,913 0 2,908,913 856,169 2,908,913 100.0% 0 2,908,913
Legacy Flexible Fund 67,157 0 67,157 67,157 67,157 100.0% 0 67,157
DigitalNL Savings 310,825 0 310,825 310,825 310,825 100.0% 0 310,825
Roots Opportunity for Growth (LAA Children) 173,208 0 173,208 27,500 173,208 100.0% 0 173,208
SUB-TOTAL (Non-Covid) 85,700,930 (60,933,844) 24,767,086 16,152,814 24,767,086 100.0% 0 24,767,086
Service Specific Earmarked Reserves (COVID-19):
Education Services Head Quarters 1,301,807 (134,000) 1,167,807 355,202 1,167,807 100.0% 0 1,167,807
Education Services Schools 12,075,284 (1,628,888) 10,446,396 5,976,069 10,446,396 100.0% 0 10,446,396
Social Work Services - Criminal Justice 57,341 0 57,341 30,875 57,341 100.0% 0 57,341
Active & Creative Communities 702,425 0 702,425 691,000 702,425 100.0% 0 702,425
Financial Insecurity / Welfare 4,645,208 0 4,645,208 2,492,923 4,645,208 100.0% 0 4,645,208
Community Renewal Fund 500,000 0 500,000 0 500,000 100.0% 0 500,000
SUB-TOTAL (Covid) 19,282,065 (1,762,888) 17,519,177 9,546,069 17,519,177 100.0% 0 17,519,177
TOTAL 104,982,995 (62,696,732) 42,286,263 25,698,883 42,286,263 100.0% 0 42,286,263
Commentary Regards UsageDESCRIPTION OF EARMARKED RESOURCE Reserve
Allocation
Adjustments
In Year
Approved
Reserve
Total
Spend to
Date
Projected Spend Reserves No
Longer
Required
Reserves
Required In
Year
FINANCIAL YEAR - 2022/23
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Status of Earmarked Reserves
Period 10 (01 April 2022 - 06 January 2023)
Education, Children & Families

Page 12

APPENDIX 5
£000 £000 £000 £000 £000
Reconfiguration of Secondary School Week
to Facilitate Transformative Practice
626 626 0 0
Reconfiguration of Secondary Management
Structures
474 474 0 0
Management Models for Future Campuses 159 159 0 0
Realignment of Early Years Grant Cash Flow
to Match Expenditure
1,000 1,000 0 0
Residential / Family Placements /
Throughcare
600 300 300 Current level of service demand is in
excess of budgetary provision
Management Action within other
areas of the Service to offset savings
gap.
300 0
Merger / Rezoning School Catchments 675 175 500 Delay in the implementation of the
associated saving
Approval in place to rephase saving
and delay full-year implementation
until 2023/24.  In-year Management
Action within other areas of the
Service to offset savings gap.
500 0
Librarians 238 177 61 Delay in the implementation of the
associated saving
Management Action within other
areas of the Service to offset savings
gap.
61 0
Reduce management fees to Culture and
Leisure NL
3,058 1,058 2,000 Delay in the implementation of the
associated saving
In-year allocation of approved
Earmarked Reserve to manage delay
in the implementation of the
associated saving.
2,000 0
TOTAL 6,830 3,969 2,861 As stated above As stated above 2,861 0
58.11% 41.89% 41.89% 0.00%
Delivered Gap Replacement Revised-Gap
DESCRIPTION Value Revised
Savings Gap CommentarySavings Gap
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Savings
Period 10 (01 April 2022 - 06 January 2023)
Education, Children & Families
APPROVED SAVINGS REPLACEMENT SAVING / FUNDING
DESCRIPTION OF APPROVED SAVING Target Value Value
Deliverable Reasons for Savings Gap

Page 13

APPENDIX 6
Value %
Recover NL One-Off Investments
Active & Creative
Communities
Culture, Leisure and
Sport Facility
Improvement Programme
Following the insourcing of culture, leisure and sport
services it is recognised that there is investment required to
ensure customers experience a positive and safe
environment from the Council's facilities which will, in turn,
support increased use of facilities and participation in active 
and creative activities.
1,000,000 1,000,000 1,000,000 100.0% 0 Usage in line budget motion approval
Active & Creative
Communities
Active60 Pass Building on the success of the Council's Active65
membership pass at £50 for the year, continuation for one
more year and extending the scheme to over 60s.
550,000 550,000 550,000 100.0% 0 "
Active & Creative
Communities
Keeping the Promise Free provision of sport and leisure facilities for care
experienced children and young people to promote physical
and mental wellbeing. This would include AccessNL
memberships, family passes to Time  Capsule Waterpark
and nutritional wellbeing support for one year.
300,000 300,000 300,000 100.0% 0 "
Active & Creative
Communities
Active Teens Extending the successful Active Teen programme of free
gym memberships for 11-15 year olds during the working
week for one more year.
300,000 300,000 300,000 100.0% 0 "
Education, Children &
Families
Scottish Attainment
Challenge
Reinstate Scottish Attainment Challenge funding for one
year only.
1,020,000 675,000 1,020,000 100.0% 0 "
Education, Children &
Families
School and Early Years
Clothing Grants
Continuation of enhanced grant value for school aged pupils
and NLC scheme for early years children for one more year.
300,000 195,000 300,000 100.0% 0 "
TOTAL 3,470,000 3,020,000 3,470,000 100.0% 0
Projected Spend Projected
Spend
Variance
Commentary Regards Usage
FINANCIAL YEAR - 2022/23
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Recover NL One-Off Investments
Period 10 (01 April 2022 - 06 January 2023)
Education, Children & Families
DIVISION PRIORITY AREA COUNCIL MOTION AREA
Approved
Investment
Total
Spend to
Date