Democracy Spraffa

Agenda pack

North Lanarkshire Council · 28 February 2023
Back to Education, Children and Families Committee — 28 February 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Our Ref:
Your Ref:
Contact:
Tel:
Fax:
E-Mail:
Date: 
Clare Louise McDonald
01698302190 
mcdonaldcl@northlan.gov.uk
17 Feb 2023 
Members of the
Education, Children and Families Committee     
Chief Executive’s Office
Archie Aitken
Chief Officer of Legal & Democratic
Civic Centre, Windmillhill Street
Motherwell ML1 1AB
DX 571701, Motherwell 2
www.northlanarkshire.gov.uk      
Notice is given that a Meeting of the EDUCATION, CHILDREN AND FAMILIES COMMITTEE is to
be held within the Council Chamber, Civic Centre, Motherwell on Tuesday, 28 February 2023 at 2:00
pm which you are requested to attend. 
The agenda of business is attached.    
Chief Officer of Legal and Democratic 
Members :     Councillors: D Ashraf, A Ballinger, C Barclay, B Baudo, M Boyd, H Brannan-McVey,
A Bustard, A Campbell, T Carragher, C Costello, M Coyle, S Coyle, G Currie, A Duffy-
Lawson, H Dunbar, F Fotheringham, M Hughes, D Johnston, T Johnston, J Jones,
P Kelly, J Keltie, A Khan, K Larson, G Lennon, H Loughran, A Magowan, A Masterton,
B McCluskey, B McCulloch, F McKay, R McKendrick, C McManus, M McPake,
A McVey, L Mitchell, K Stevenson, J Toner, N Wilson and G Woods, G McCormack; M
McCrossan; G Paterson and I Scott.     
Page 1 of 253

Page 2

Page 2 of 253

Page 3

AGENDA
(1) Declarations of Interest in terms of the Ethical Standards in Public Life Etc. (Scotland) Act
2000
OPERATIONAL
(2) Appointment of Representative of the Church of Scotland (page 5 - 8)
Submit report by the Chief Officer (Legal and Democratic) advising of the nomination made by
the Church of Scotland, for appointment as their statutory representative to the Committee
(copy herewith)
(3) 1140 Early Learning and Childcare Expansion Programme Update (page 9 - 28)
Submit report by the Chief Officer (Education - North) providing an update on the 1140 hours
Early Learning and Childcare expansion prorgamme within North Lanarkshire (copy herewith)
(4) Strathclyde Park Outdoor Education Programme (page 29 - 34)
Submit report by the Chief Officer (Education - North) providing an update on the increased
number of participants and the range of activities now available to young people (copy
herewith)
(5) Getting it Right for Every Child (page 35 - 62)
Submit report by the Chief Officer (Education - North) providing an update on the progress of
the implementation and development of the Getting it Right for Every Child (GIRFEC) process
across the Education and Families Services (copy herewith)
(6) Proposals for Statutory Public Consultations on the Proposed New Build for Gartcosh Primary
(page 63 - 80)
Submit report by the Chief Officer (Education - North) seeking approval to undertake statutory
public consultations on the proposed new build for Gartcosh Primary School (copy herewith)
(7) Proposals for Statutory Public Consultations on the Proposed Relocation of Mavisbank School
to the existing Carnbroe Primary (page 81 - 96)
Submit report by the Chief Officer (Education - North) seeking approval to undertake statutory
public consultations on the proposed relocation of Mavisbank School to existing Carnbroe
Primary (copy herewith)
(8) Proposals for Statutory Public Consutlation on the Proposed Rezoning of the Dunlop Estate
(page 97 - 110)
Submit report by the Chief Officer (Education - North) seeking approval to undertake statutory
public consultations on the proposed rezoning of the Dunlop estate within North Lanarkshire
(copy herewith)
(9) Annual Report of the Chief Social Work Officer 2021/22 (page 111 - 174)
Submit report by the Chief Social Work Officer seeking approval of the annual report of the
Chief Social Work Officer 2021/22 (copy herewith) Page 3 of 253

Page 4

2  
(10) Keeping the Promise - Care Experienced Children and Young People (page 175 - 194)
Submit report by the Chief Social Work Officer providing an update on the key developments
to deliver the Promise: Care Foundation to support care experienced children and young
people (copy herewith)
(11) Keeping the Promise - Support for Families, Children and Young People (page 195 - 218)
Submit report by the Chief Social Work Officer outlining that a new approach to youth justice
in Scotland is required and outlining the Council's approach (copy herewith)
PERFORMANCE
(12) Strategic Performance Framework - latest Performance Results for Education
(page 219 - 232)
Submit joint report by the Chief Officer (Education – North) and the Chief Officer (Education -
South) providing an update on the latest performance results for Education under the
Strategic Performance Framework (copy herewith)
FINANCIAL
(13) Revenue Budget Monitoring Report Period 10 - 1 April 2022 to 6 January 2023
(page 233 - 246)
Submit report by the Deputy Chief Executive providing a summary of the financial
performance of the Education, Children and Families Service for the period 1 April 2022 to 6
January 2023, Period 10 (copy herewith)
CONTRACTS
(14) Contracts Awarded Below Committee Approval Threshold (page 247 - 253)
Submit report by the Chief Officer (Asset and Procurement) providing notification of the
contracts awarded between 1 October to 31 December 2022 with a value below the financial
threshold requiring Committee approval (copy herewith)
Page 4 of 253

Page 5

North Lanarkshire Council
Report
Education, Children and Families Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref   Date 28/02/23 
Appointment of Representative of the Church of Scotland 
From  A Aitken, Chief Officer of Legal and Democratic  
E-mail rosean@northlan.gov.uk Telephone 07951 409714 
1. Background 
1.1 At its meeting held on 22 November 2022, the Committee received verbal notification
from the Democratic Services Manager that notification had been received by the
Council that Mr. D Hannan, the representative of the Church of Scotland, had tendered
his resignation. At that time, no nomination had been received for a new representative. 
1.2 In accordance with the Local Government (Scotland) Act 1973, where the Council
constitutes a Committee to deal with education issues, there is a statutory requirement
to appoint, as Members of the Committee (a) one representative of the Church of
Scotland, nominated in such a manner as may be determined by the General Assembly
of the Church; (b) one representative of the Roman Catholic Church, nominated in such
Executive Summary 
The purpose of this report is to notify the Committee of the nomination made by the Church
of Scotland for Ms. Margaret Clarkson to be appointed as its statutory representative to the
Committee. 
Recommendations 
The Committee is recommended to:- 
(1) Acknowledge the nomination by the Church of Scotland for Ms. M. Clarkson to be
its representative on the Committee, and 
(2) Remit this report to the Council with a recommendation that Ms. M. Clarkson be
appointed as the representative of the Church of Scotland on the Education,
Children and Families Committee. 
The Plan for North Lanarkshire
Priority  Enhance participation, capacity, and empowerment across our
communities
Ambition statement (20) Improve the involvement of communities in the decisions, and
development of services and supports, that affect them
AGENDA ITEM 2
Page 5 of 253

Page 6

a manner as may be determined by the Scottish Hierarchy of the Church, and (c) one
person in the selection of whom the Council shall have regard, taking account of the
representation of the Church of Scotland and Roman Catholic Church, to the
comparative strength within the Council’s area of the churches and denominational
bodies having appointed places of worship. The statutory provision accordingly applies
to the Education, Children and Families Committee. 
2. Report 
2.1 Following the completion of its internal processes for identifying an appropriate person,
notification was received from the Church of Scotland by the Council on 2 February
2023 that Ms. M. Clarkson was that Church’s nominated person. 
2.2 Ms. Clarkson brings 37 years’ experience as a classroom teacher, both within
mainstream secondary and the additional support needs sector, and still has an interest
for young people and education. 
2.3 The Council is bound to accept the nomination from the Church of Scotland and the
Committee is recommended to remit this report to the Council seeking its formal
approval for Ms. Clarkson to be appointed to the Committee. Until formal approval is
provided by the Council, Ms. Clarkson is unable to take up her position on the
Committee. Accordingly, if the Council approves the appointment, the first meeting of
the Committee that Ms. Clarkson will be entitled to attend is on 23 May 2023. 
3. Measures of success 
3.1  Compliance with the statutory obligations set out in the Local Government (Scotland)
Act 1973   
4. Supporting documentation 
None 
Archie Aitken
Chief Officer of Legal and Democratic 
Page 6 of 253

Page 7

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
This appointment is undertaken in accordance with the Local Government
(Scotland) Act 1973.
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Page 7 of 253

Page 8

Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 8 of 253

Page 9

North Lanarkshire Council
Report
Education Children & Families Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref  GML/JOH Date 28/02/23 
P030.1 – 1140 Early Learning & Childcare Expansion Programme
Update 
From  Gerard McLaughlin, Chief Officer (Education - North) 
E-mail mclaughling@northlan.gov.uk Telephone 01236 812269 
Executive Summary 
The 1140 Hours Expansion programme for Early Learning and Childcare (ELC) is a
national programme developed in a unique way, in response to specific local
circumstances. 
This report provides Committee with an updated position on the 1140 hours Early Learning
and Childcare (ELC) expansion programme within North Lanarkshire. It reinforces previous
reports which have already been approved by Committee and is based on significant
consultation with stakeholders. In addition, it supports The Plan for North Lanarkshire. 
The report focuses on the capital programme, workforce and progress in relation to quality. 
In addition, it provides a financial update as of period 9. 
Recommendations 
It is recommended that the Education and Families Committee:    
(1) Endorse the 1140 project update
(2) Endorse the progress of Heathery Park Family Learning Centre
(3) Endorse the position regarding the ELC Procurement Framework
(4) Endorse the increase in rates for day care providers. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (7) Enhance collaborative working to maximise support and ensure
all our children and young people are included, supported, and safe
AGENDA ITEM 3
Page 9 of 253

Page 10

1. Background 
1.1 North Lanarkshire Council (NLC) achieved full delivery of 1140 hours by 30
September 2020, prior to it being legislative from August 2021. 
1.2 The ELC team continues to progress with plans to ensure children and families fully
access the benefits of 1140 hours. 
2. Report 
2.1 Infrastructure Projects 
2.1.1   Table 1 provides an update regarding the outstanding infrastructure projects.   
Table 1
Site Start Date Completion Date
Extensions / Adaptations
Craigneuk FLC February 2023 March 2023
Heatherypark FLC April 2022 May 2023 
2.1.2 The work being carried out at Craigneuk Family Learning Centre has been delayed due
to issues with the centres roof. The roof is being replaced and work is scheduled to be
completed by the end of January, allowing the nursery adaptions to then start.   
2.1.3 Work continues within Heatherypark FLC.  Albeit the project is delayed the contractor
is making progress.  The building / extension is effectively wind and watertight, the
carpark is complete and groundworkers have been appointed and work re-commenced
on the deck area. Regular meetings continue to take place with the contractors and
officers from Asset & Procurement to ensure the continuous progress of the work.  At
this time, the service believes the completion date will be by the end of May 2023. 
2.1.4 The Head of Centre and ELC practitioners have been appointed.  Plans are in place to
fully resource and set up Heatherypark FLC at the end of May 2023 to enable it to open
for June 2023. The service will review eligible 2-year-old applications and the ELC
locality panel chair will work closely with other agencies to review applications
(requests for assistance) and allocated placements for 2-year-old children most in
need. 
2.2     Workforce 
2.2.1 Committee will recall NLC employed 536 additional employees to support the
implementation of 1140 hours ELC.  Just over 300 positions were temporary (Support
Workers & Keyworkers) and it is now our ambition to secure permanency for these
positions. There was recognition that due to the large volume of these positions there
8 FLC completed 7 ELC adaptations
completed
103 settings
benefitting from
minor works
Page 10 of 253

Page 11

was the potential to impact significantly on the Council’s recruitment team if standard
methods were used. As a result, there was discussion with the Human Resource
Business Partnership Manager, Human Resource Business Partner Team and
Employment Service Centre.  It was agreed to implement a modified process to
expedite the exercise. 
2.2.2 A series of briefing meetings was held to disseminate information via Heads and
detailed email instructions were issued along with Process Maps / Frequently Asked
Questions Trade Unions were fully involved in agreeing the process and have been
updated periodically.  The modified process had three stages: 
• Stage 1 – Professional dialogue for like for like vacancies in current establishment
for employees with qualifying service at 4/11/22. 
• Stage 2 - Professional dialogue for like for like vacancies in current establishment
for employees with qualifying service at 28/6/23.
• Stage 3 – Residual vacancies recruited by formal internal exercise via standard
method. 
2.2.3 A further update regarding the outcome of this recruitment process will be provided to
the next committee. 
2.2.4 It is anticipated that the exercise will be completed by Spring 2023, and this will provide
employees with certainty and the service with a stable workforce. 
2.2.5 Opportunities for all levels of ELC staff to work towards and achieve certificated
qualifications have been offered annually. Table 3 provides a breakdown of the number
of staff attending this year with associated costs. Committee are asked to note the BA
costs are for the 4-year period.   
Table 3
Course  Number of
participants  
Costs 
PDA Day Release  15  £9,000 
PDA Online  21  £12,030 
HNC Day Release  30  £6,000 
BA Evening (over 4yrs)  44  £290,138 
Total  110                  £317,168 
2.2.6 Committee should note that the career pathway established to support the professional
development of the workforce and the implementation of 1140 hours has provided in
total 312 ELC staff with the opportunity to work towards and achieve additional
qualifications.  This is a significant achievement and recognises the excellent work
between the service and partners. 
2.3       Quality 
2.3.1 Early Learning and Childcare (ELC) Training Calendar A full catalogue of training
for ELC Practitioners at all levels has been established for August 22 – June 23.  The
training sessions on offer are in response to need derived from previous training
evaluation forms, scrutiny visits carried out by the Quality Team, The Care Inspectorate
and Education Scotland. Training courses are inclusive of both Local Authority and
Partner Providers and sessions are added throughout the year in response to need. 
Page 11 of 253

Page 12

2.3.2 In addition to the training calendar, a revised ten session leadership programme will be
delivered to Heads of Centre, Depute Heads of Centre, Principal Lead and Leads
(within both partner providers and local authority settings). This programme will develop
highly effective lead practitioners through high-quality professional learning
opportunities. It will facilitate a collaborative network between colleagues and develop
pedagogical skills and practice of leaders at all levels. The programme will run from
January - June 2023 and will be delivered. 
2.3.3 Taking cognisance of the increasing number of new Heads of Centre within the service,
a full and robust Induction programme will be rolled out to new and existing Heads
which will include a range of operational issues that are essential for effective service
delivery. 
2.3.4 All training sessions for session 2022-2023 will be a hybrid model of face-to-face and
virtual sessions. 
2.3.5 Quality Assurance:  The national standard sets out what children and families should
expect from their early learning and childcare experience regardless of where they
access their child’s funded hours.  Scottish Government have outlined that children and
families should expect quality services with evaluations that rate good (4) or above. To
support continuous improvement the following activities and actions are undertaken to
support establishments to meet the national standards: 
 The Quality Team carry out support visits to work alongside settings to evaluate and
monitor performance, to highlight good practice and provide support and challenge to
make improvements. 
 Formal inspections / scrutiny is also a key aspect of the quality framework within
ELC.  Education Scotland completes announced inspections using a variety of models.
This includes a full model inspection which covers four Quality Indicators (QI), and a
short model inspection which covers two QI. Some inspections are undertaken by both
the Care Inspectorate and Education. 
 In addition to this, Care Inspectorate carry out unannounced inspections of both
nursery settings and childminders.  Reference is made to the newly published quality
framework “A quality framework for day care of children, childminding and school-aged
childcare” (February 2022.).  The framework supports settings to evaluate their own
performance in addition to providing an independent assurance for care inspectors. 
2.3.6 Appendix 01 provides an overview of the standards of quality across ELC as of
December 2022.   
2.4 Early Learning and Childcare Framework 
2.4.1 Committee will recall that, due to the current Early Learning and Childcare (ELC)
Framework coming to an end – 31 July 2023, a new tender went live on Public Contract
Scotland on 4 October 2023, to establish an ELC Framework from 1 August 2023 – 31
July 2027. 
2.4.2 The tender closed at 12 noon on 24 October 2022, with 140 applications received from
childcare providers.   
Page 12 of 253

Page 13

2.4.3 Due to a legal challenge within the standstill period, and in compliance with The Public
Contracts (Scotland) Regulations 2015, tenderers were advised that North Lanarkshire
Council are unable to award the Flexible Framework for Early Learning and Childcare
Services in North Lanarkshire 2023 was delayed.   
2.4.4 Following an evaluation of applications, 138 were assessed as successful – 98
childminders and 40 partner nurseries, and 2 unsuccessful; tenderers were notified of
the outcome in writing and the required standstill period has been successfully
completed. 
2.5       Admissions 2023/2024 
2.5.1 Due to the legal challenge, and in accordance with procurement regulations, the council
was legally prohibited from concluding the ELC framework and therefore the
commencement of the 20234/2024 admissions process was delayed. In previous years
the deadline for admissions would be on, or around, 10 February 2023.   
2.5.2 Following the successful completion of the framework the admissions process went live
on Wednesday, 8 February 2023, with applications being accepted up to, and including
10 March 2023.  All providers have been notified that the process has gone live and
will be supported by the Ealy Years team. 
2.5.3 The website has been updated to reflect the above, with access available to all
necessary information – application form, guidance notes, etc.  The application process
will be advertised on various social media platforms to ensure a high uptake. 
2.6       Cross Boundary 
2.6.1 Committee will recall that a Cross Boundary Protocol is currently in place for children
attending partner provider settings.  Cross boundary local authority applications
continue to be progressed in line with NLC admission policy.   
2.6.2 Following the commencement of the 2023/2024 admissions process, Committee will
be updated regarding cross boundary applications received following the
commencement of the admissions process. 
2.7       Deferred Entry 
2.7.1 Committee will recall that due to the forthcoming change in legislation, effective from 1
August 2022, the Deferred Entry Working Group reconvened to review processes and
communications. 
2.7.2 Legislation states that those children who are 4 years of age, on the date they are
eligible to start school (i.e., children with birth dates on or between the day after school
commencement date in August and the last day in February), can defer entry to school
for a year and access an additional year of funded early learning and childcare.  The
Board is advised that following consideration it was agreed that the ‘school
commencement date’ will be 16 August 2023.  It should be noted that this date will
change annually, in line with the summer leave period. 
2.7.3 Information on the NLC website has now been updated to reflect the changes in
legislation.  This has also been shared with all providers, ELC colleagues and
representatives from the Give Them Time campaign. 
Page 13 of 253

Page 14

2.7.4 This legislative change will align the funded ELC offer more closely with the existing
right to defer children commencing Primary 1.  This will allow families to make decisions
based on what they feel is in the best interests of their child, without the financial barrier
of additional ELC costs. 
2.7.5 Guidance explaining the change is available online on the Scottish Government
website https://www.gov.scot/publications/early-learning-childcare-statutory-guidance-
july-2021/ 
2.7.6 Table 4 below provides an overview of the number of applications received for the
2021/2022 and 2022/2023 academic session and the current number received to date
for academic session 2023/2024.  Committee are asked to note the increase in
applications for the academic session 2023/2024, which was anticipated due to the
change in legislation. 
Table 4
2021 / 2022 2022 / 2023 2023 / 2024
Automatic Discretionary Automatic Discretionary Automatic Discretionary
192 91 181 83 383 18
Total: 283 Total: 264 Total: 401 
2.8       Day Care Providers - Rate 
2.8.1 Following guidance from Scottish Government, Committee will recall that the rate paid
to funded providers, £5.77 for 3-5 years olds and £6.03 for eligible 2-year-olds, was
increased from 1 August 2022. 
2.8.2 Day care providers who are in the main childminders that provide short term care for
families in crisis are paid at the same rate as that for eligible 2-year-olds.  This has
been the case for several years.  Therefore, committee are asked to endorse an
increase in the rate paid to day carers.  That is, an increase from £5.80 to £6.03 per
hour. 
2.9         External Partner Provider Commission Payments 
2.9.1 Table 5 provides an overview of Partner Provider Commission Payments, from April
2022 to December 2022. 
Table 5
External Commission Payments 
April to July September to December
3-5 Payments 1140 hours £4.572m £4.884m
Eligible 2 Payments 1140 hours £0.328m £0.348m
Meal Payments 2-5-year-olds £0.316m £0.363m
Total £5.216 £5.595 
2.10 Healthy Milk & Snack Scheme 
2.10.1 Committee will recall that there is a requirement for providers to re-register for the
Healthy Milk and Snack Scheme on an annual basis.  In doing so this allows them to
update the figures re children in their care. 
2.10.2 Currently 79 partners have registered for session 2022-2023: 31 from Partner
Nurseries and 48 from Childminders.
Page 14 of 253

Page 15

2.10.3 The registration process closed at the end of January 2023 and will re-open on 1 March
2023 to allow new providers to join the scheme.  Further updates will be provided to
committee. 
2.11 Parent Survey 
2.11.1 Committee will recall the consultation that took place between 20 September – 14
October 2022, re the delivery of early learning and childcare.   
2.11.2 Whilst a summary of findings from the consultation was previously reported, a more
comprehensive overview has been provided for the members – Appendix 02. 
2.11.3 In total 845 responses were received (approximately 7,500 children within ELC 845
responses equates to approximately 11%).  An overview of the outcomes is provided
in Table 6 below: 
Table 6
Question Highest Response Percentage
What best describes your situation Child currently accessing
ELC
93%
Main benefit of 1140 To support wellbeing
development
62%
Reason for choosing provider Quality / Reputation 42%
Preferred choice/future choice of
provider
Nursery attached to a
school
40%
Do you use/plan to use the full 1140
hours
Yes 92%
Preference to using 1140 hours All hours in one setting 35%
Where do you access ELC updates Social Media 33% 
2.11.4 Overall, the consultation was very positive and highlighted that almost all children are
accessing their full entitlement and that that parents/carers are benefiting from the
choice of provision and operating models available to them 
2.11.5 Based on the low number of overall responses and the low numbers of responses from
parents/carers whose child is due to access ELC, the service plans to review and
improve communication strategies for future consultations.  It is important to ensure we
capture the views of both existing and future service users to better inform planning. 
The consultation will be recirculated in Spring 2023 with a focus on parent/carers due
to access ELC from August 2024. 
2.12 Communications 
2.12.1 The service continues to meet regularly with both Care Inspectorate and Trade Unions
regarding delivery of ELC provision. Relations continue to be collaborative and positive. 
2.12.2 The Corporate Communications team continue to support ELC with all communications
to support the delivery of 1140 hours.  Update deferred entry information has been
posted on the ELC website and communications has been prepared to support the
2023/2024 admissions process. 
Page 15 of 253

Page 16

2.12.3 A copy of the ELC 1140 newsletter, circulated in November is attached – please refer
to Appendix 03. This edition includes examples of excellent practice across local
authority nurseries and funded providers, including childminders. 
2.13 Financial Update            
Capital 
2.13.1 Since inception, the ELC Expansion (1140 Hours) Capital Programme has spanned
several financial years cumulating in new Family Learning Centres and renovations of
existing establishments across the authority. 
2.13.2 The Enterprise & Communities 2022/23 capital programme of £157.168m was
approved at Policy & Strategy Committee on 17 March 2022. The 2022/23 programme
has since been increase by £21.479m relating to carry forwards from 2021/22
(£5.796m) and additional external funding (£15.683m). Included in the approved
2022/23 capital programme, for Enterprise & Communities, is £2.192m regarding ELC
Expansion (1140 Hours). 
2.13.3 As at Period 09, the Service is projecting an underspend of £0.256m in relation to the
associated ELC Expansion (1140 Hours) capital workstreams. 
2.13.4 t should be noted that there are recruitment fees, that have been paid since 2018,
included within capital spend. This year the spend is £0.075m at period 9, and this
projects £0.125m by the end of the year. The service will require to review this based
on the programme of works outstanding. 
2.13.5 Also, for Covid costs for the Phase 1 builds, there was £0.537m of budget set aside for
this. The final bill has been agreed as £0.391m. This underspend of £0.146m is
included within the current year projection, so if there is any clawback of this budget,
then the 1140 capital spend will fall into an overspend position. 
Revenue 
2.13.6 The gross expenditure budget for ELC in 2022/23 is £61.445m which is partly offset by
the ELC Expansion Grant of £34.842m. The projected outturn for 2022/23 as of 9
December 2022 (Period 9) is a net underspend of £0.323m. 
3. Measures of success 
3.1  Children have access to funded entitlement of 1140 hours of ELC.   
4. Supporting documentation 
4.1       Appendix 01: ELC Standards of Quality
4.2       Appendix 02: Parent/Carer Survey Outcomes
4.3       Appendix 03: ELC Newsletter 
Gerard McLaughlin
Chief Officer (Education - North) 
Page 16 of 253

Page 17

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The strategy of the service, as approved by the Education Corporate Management
Team (November 2017), is to positively target families who live in SIMD areas 1 – 4
to address disadvantage and barriers to success.  Consideration has also been
given to ensure that there is a mix of services within localities to support
accessibility and parental demand.   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Section 2.13 provides a financial update/impact as of period 9 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Support in place from HR to support the ELC recruitment 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Consultations are ongoing with Legal regarding the the position with the ELC
procurement framework. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Page 17 of 253

Page 18

Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The paper contains information regarding the delay of the ELC admissions
process, which may impact on the level of enquiries the ELC website will receive. 
A statement has been produced to keep parents/carers up to date.
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Delays to the admissions process 2023/2024 could impact on the timeline to
secure placements for all eligible 2-5-year-olds by August 2023.  This will impact
on the statutory 1140 hours entitlement for children and families.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 18 of 253

Page 19

Appendix 01
Early Learning & Childcare Standards of Quality
December 2022
__________________________________________________________________________ 
Standards / Gradings (National Standard / Expectations:  4 – Good) 
• 1: Unsatisfactory
• 2: Weak
• 3: Adequate
• 4: Good
• 5: Very Good
• 6: Excellent 
It should be noted settings are graded on 4 key themes therefore the standards below are
based on an average across settings. 
Page 19 of 253

Page 20

Page 20 of 253

Page 21

Appendix 02 
ELC Parent/Carer Consultation Findings
The ELC Parent / Carer Consultation went live on Tuesday, 20 September 2022 and
closed on Friday, 14 October 2022.
In total 845 responses were received.
Outlined below is an overview of the responses, to each of the nine questions asked:
Q 1 – What Best Describes Your Current Situation?
This question was looking to understand, from those completing the consultation, if they
currently had a child within an ELC setting or a child due to take up a place soon.  
A total of 841 responses were received.
Response Selected Number of Responses % Of Total Responses
Child currently within an ELC
setting
777 93%
Child due to take up place
within ELC Setting
45 5%
Neither of the above 19 2% 
Q 2 - Do you have a child or children under 5 years of age? 
This question was looking to gauge, from those responding, if they had a child under 55 years
of age.
A total of 843 responses were received.
Response Selected Number of Responses % Of Total Responses
Yes 838 99%
No 5 1% 
Q 3 - If yes, please provide dates of birth for each child.
This allowed us to gauge the number of children, from birth to 5 years of those responding.
A total of 838 responses were received. * 
Response Selected Number of Responses % of Total Responses*
Born in 2018 315 38%
Born in 2019 342 41%
Born in 2020 101 12%
Born in 2021 96 11%
Born in 2022 61 7% 
*Please note that many responses had multiple children born in different years, therefore the
total result is greater than 100% when collated. 
Page 21 of 253

Page 22

Q 4 - Where do you reside in North Lanarkshire?
Responses to this question allow us to see, from those responding, the areas of North
Lanarkshire people reside in.
A total of 837 responses were received.
Response Selected Number of Responses % Of Total Responses
Airdrie (ML6 area) 151 18%
Motherwell (ML1 area) 135 16%
Cumbernauld (G67/G68
area)
113 13%
Wishaw (ML2 area) 97 12%
Coatbridge (ML5 area) 89 11%
Stepps/Moodiesburn
(G33/G66/G69 area)
67 8%
Bellshill (ML4 area) 60 7%
Shotts (ML7 area) 59 7%
Kilsyth (G65 area) 37 4%
Uddingston (G71 area) 23 3%
No address provided 6 1% 
Q 5 - What do you see as the main benefit of funded ELC? 
This question provides us with understanding of people see as being the main benefit of funded
early learning and childcare.
A total of 843 responses were received. 
Response Selected Number of Responses % Of Total Responses
Child Wellbeing &
Development
530 62%
Support to Work/Study 181 22%
Reduction in Childcare Costs 104 12%
Parental Support 14 2%
Other 14 2% 
Q 6 - When choosing an ELC provider, what do you consider to be most important?
Responses to this question allow us to understand what is important when choosing an ELC
provider.  
A total of 844 responses were received.
Response Selected Number of Responses % Of Total
Responses
Quality / Reputation 355 42%
Proximity to Home 169 20%
Service Attached to Future School 122 14%
Operating Hours 79 9%
Continuity – Family Member Attends 58 7%
Other 32 4%
Option to Purchase Additional Hours 15 2%
Page 22 of 253

Page 23

Offers Full Time Outdoor Provision 9 1%
Offers Gaelic Provision 5 1% 
Q 7 - What ELC services do you use, or are planning to/considering using in the future?
This question provides an insight into the preferred option of type of services being used or
are or are considering using.
A total of 837 responses were received.
Response Selected Number of Responses % Of Total Responses
Nursery Attached to a
School
331 40%
Local Authority Nursery 274 32%
Private / Voluntary Nursery 195 23%
Childminder 35 4%
Outdoor Provision 2 1% 
Q 8 - Do you use, or plan to use, all your 1140 funded hours? 
Responses to this question allow us to gauge the numbers of children utilising their full 1140
hours entitlement. 
A total of 840 responses were received.
Response Selected Number of Responses % Of Total Responses
Yes 771 92%
No 69 8% 
Q 9 - What is your preference to using 1140 Hours?
Where possible we look to meet the needs of all parents/carers, including the delivery model
of 1140 hours.  With these responses we can identify the preferences in regard to how hours
are delivered.
A total of 838 responses were received.
Response Selected Number of Responses % Of Total Responses
All Hours in One Setting 291 35%
Term-Time 285 34%
Full-Time 190 23%
Other 37 4%
Split Between 2 Providers 35 4% 
Page 23 of 253

Page 24

EARLY LEARNING & CHILDCARE 1140 News
WELCOME
Reflective practice and self-evaluation are at the foundation of the delivery of high quality Early Learning
and Childcare. This newsletter will share some of the excellent practice across ELC settings within North
Lanarkshire where staff use a range of ways to support continuous improvement.
Jennifer O’Hara, Operational Manager – Inclusion and Early Learning and Childcare.
Contributions to the newsletter and suggestions are welcome.
Please email: corporatecommunications@northlan.gov.uk
‘Without proper
self-evaluation,
failure is
inevitable.’ John Wooden
I am delighted to introduce our full
team of Quality Officers who will be
supporting early learning settings across
North Lanarkshire to ensure we provide
the very best for our families.
Lorraine Smith smithlo@northlan.gov.uk   
Lynn Walsh Walshlyn@northlan.gov.uk
Liz Kerr KerrLiz@northlan.gov.uk   
Vicky Harris harrisv@northlan.gov.uk
Ruth Eglinton eglintonr@nborthlan.gov.uk 
Cheryl Valentine valentineC@northlan.gov.uk
Appendix 03
Page 24 of 253

Page 25

The Care Inspectorate published
their new Quality Framework in
March this year and advised that
they would use the framework
in their inspections from June
2022.  Here is the experience of
some of our settings who have
recently been inspected.
The inspection lasted 21/2hrs and the
children in attendance that day, attend
my service for the full 1140 funding.
The inspector was very focused on
the Quality Framework and spoke to
me about the children and looked
closely at the environment.
I had evaluated my own performance
using the Quality Framework. To help
me evaluate my service I also work
closely with families to involve them in
their child’s care and development. I
do this through personal plans and
regular communication. I use best
practice guidance to reflect on the
quality of the children’s care within my
setting helping me to identify
strengths and areas for improvement.
The views of children and families are
sought regularly. I gather information
both informally through daily chats
and texts, and formally through
questionnaires.
I am committed to the ongoing
improvement of my service, and this is
demonstrated in the wide variety of
training that myself and my husband
have undertaken.
When the child starts, I provide a
detailed handbook and provide
regular updates to policies as practice
changes.
• Staff were caring,
nurturing and
responsive and knew
children very well. This
created a secure,
supportive play and
learning environment
for children.
• The environment
offered many
opportunities for
child-led, free flow play,
both indoors and
outdoors.
• The manager and
depute provided strong
leadership and
supported the staff
team to provide high
quality care and
support for children.
• There was a focus on
self-evaluation, quality
assurance and a clear
vision in place to ensure
ongoing service
development and
positive outcomes for
children and their
families.
• The overall lunchtime
experience for children
was relaxed, pleasant
and sociable.
• The staff team at
Calderview were
delighted by the
feedback provided from
the Inspector. She
highlighted the
strengths of our service
and reinforced our
commitment and
dedication to children
and families in the
community of
Chapelhall. We are so
proud of how far we
have come and strive to
continue to develop our
service further.
Weans World
Calderview Family Learning Centre
Please follow our Twitter feed on @EarlyYearsNLC for the most
up to date information.
northlanarkshire.gov.uk/elc
Geraldine Duffy, Childminder
On 27 June 2022 between 09:30 and 13:15 we received our first
unannounced visit from Care Inspectorate. During the process the
inspector spoke with children, parents, staff and visiting professionals.
They observed practice and daily life and reviewed documents.
The inspection was a very relaxed and pleasant experience for staff
and children. The day was no different from a normal day at
Calderview. Our Inspector was mindful of the needs of our children and
families and asked questions during appropriate times. The key points
from our inspection were that:
Jayne Donaldson, Depute
Page 25 of 253

Page 26

The provision within Step by Step is of high quality and the
way we support children is embedded in our practice. The
expectations of the management team are high and both
the head and depute are very visible on the playroom
floors to provide support and encourage development.
Staff actively participate in their own self-evaluation and
are very honest about their own strengths and areas of
improvement. Self-evaluation, in a meaningful way, is a
regular discussion point and this over time has become a
habit to us. These discussions help the team gain a greater
insight and confidence to set future goals for improvement.
Staff feel confident and valued and ready to learn new
skills.
Play is always at the centre of what we do, and this was
showcased throughout the inspection.
Step by Step Nursery Claire Irvine,  Manager Berryhill Nursery Class  Carrie Nicol, Head Teacher
Following our most recent Care Inspection in June this
year, we are delighted with the positive validation and
feedback we have received.  The inspection team
highlighted many areas of strength throughout our report. 
Some high-level messages included our shared approach
to self-evaluation which ensures continuous improvement
within our setting.  A key feature of this is our robust
systems that are in place to allow us to evaluate what is
working well and what could be done better to improve
outcomes for our children and families.  To inform ongoing
reflections, staff refer to ‘How Good is our Early Learning
and Childcare’, and ‘The Quality Framework’.  Staff
regularly analyse a variety of data to ensure that
improvements are specific to the needs of our learners and
our context, and we ensure that staff training opportunities
are linked closely to identified areas of improvement. 
Surveys, improvement conversations and professional
dialogues allow all stakeholders to contribute to our
improvement process on an ongoing basis.  Staff are
empowered to have ownership of change and our staff
development processes allow all staff to take responsibility
and lead the development of specific areas, while sharing
skills and expertise.
Our children are at the heart of everything that we do, and
they are crucial in our improvement processes.  Our
children’s voice is evidenced through observations, mind
maps, floor books and our ‘Little Chatter Matters Wall’
which links clearly to the UNCRC.
Staff ensure that they create a rich
and engaging learning environment
for our children allowing them to have
fun while being inquisitive and
creative.  Our children are very much
involved in planning their own
learning and staff are responsive to
this and facilitate their learning
through various pathways.  
The outdoor environment is
extremely well utilised with lots of
emphasis on sand and water play
experiences.         
Play experiences within the
setting incorporate STEM and this
practice was highlighted by the
Care Inspectorate.
Staff all have a very good understanding of child
development and are skilled at creating high quality play
and learning experiences which meet the needs of all. 
Interactions between staff and children are warm,
welcoming, caring and respectful. Solihull approaches are
embedded and there is a very positive and nurturing ethos
throughout.
Page 26 of 253

Page 27

Here at Honeywell Nursery Class, we recognise that it is
important to place the children and their families at the
heart of everything we do. We consult regularly with
children and parents/carers. Their voices and views are
listened and responded to.
We recently took part in the STV Children’s Appeal – Big
Scottish Breakfast. This was a way to bring our families
together to enjoy a lovely breakfast together and raise lots
of money for a great cause. Our children are all very
confident at sharing what types of foods make up a
healthy breakfast and were delighted to share their
knowledge with their families. Our families enjoyed this
experience so much that we are planning to arrange
another one soon
Families also join us on our visits to our Forest Space.
Through continuous self-evaluation and consultations, we
have adapted the way we offer these sessions to suit
families. We now offer each group of children and their
families a 4-week block. Children, parents/carers and staff
all agreed that attending over these weeks gave everyone
a real flavour of what goes on at these visits. The skills the
children have developed have been amazing and the
parents/carers told us how they feel more confident
spending time outdoors with their children and recognised
how important this is for all their families’ health and
wellbeing.
Family Engagement at Honeywell Nursery Class
Maureen O’Hare, Lead Early
Learning Practitioner
Page 27 of 253

Page 28

Abernethyn Family Learning Centre
and Balmalloch Nursery Class very
kindly shared an honest account of
their journey towards achieving the
award.
“The staff at Abernethyn Family
Learning Centre are delighted to have
recently gained our Breastfeeding
Scotland Friendly accreditation. When
we began our journey, we did have
some initial concerns about being
inclusive and respectful of the
different family dynamics of the
families accessing our service. These
concerns were allayed through
discussions with Louise our Health
Improvement Practitioner, staff and
our families, so we embarked on our
journey. All staff have now completed
the online course and we as a team
feel that we now have a better
understanding of how to support our
families with breastfeeding within our
centre as we begin to fully embed the
principals in our practice”.
“Here at Balmalloch Nursery Class we
are proud to provide an inclusive
environment where all families are
welcome. We discussed our
environment and the changes if any,
we would need to make, and to be
honest it was a very easy journey for
us. When we think of our children,
their play spaces, and our resources it
made sense to us that we wouldn’t
include bottles or dummies in our
environment. A breastfeeding friendly
approach means inclusivity for
everyone. We don’t provide our
children with superhero costumes,
instead we provide materials and
loose parts to allow them to develop
their creativity. If our children need a
house for the dolls, they make one
from construction materials and in the
same way, our children can use loose
parts and open-ended resources to
role play feeding babies with a bottle,
if they wanted to do so. We have not
alienated anyone by removing these
resources, it’s had the opposite effect.
Our staff team, children and parents
are valued, nurtured and included.”
Breastfeeding Friendly Scotland Award
We are delighted to share that all our Local Authority ELC settings are now working towards the
Breastfeeding Friendly Scotland Award with 38% having achieved the award to date. We are
hopeful that all Local Authority ELC settings will be accredited as being “Breastfeeding Friendly”
establishments by the end of 2022.
Staff comments
“We have a breastfeeding
policy within our nursery. It’s
there for both parents and
staff. We didn’t create a
specific feeding area as it’s
important that our
breastfeeding Mum’s feel
comfortable to feed anywhere
in our establishment, whether
that’s in the playroom or in the
staff room if they choose
somewhere more private.”
“Using the correct
terminology
normalises
breastfeeding and
takes away that
stigma. It means, as
our children get
older, using
language such as
breasts and
breastfeeding isn’t
out of the ordinary.”
absolutely encourage them to
learn about their bodies, how
they grow and develop and
how some babies as well as
animals are fed. It’s so natural
and we need to embrace that
and take that stigma away.”
Children’s comments
“I think milk comes from
Mum’s belly button.”
“the Mummy’s
breasts.”
“it comes from here”
and pointed to his
nipple.
“the Mummy drinks milk
and it goes into her
breast.”
“my wee sister gets milk from my Mum’s breast.”
Lorraine Smith, Quality Officer
Page 28 of 253

Page 29

North Lanarkshire Council
Report
Education, Children & Families Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref GM/HL Date 28/02/23 
PO25.1 – Strathclyde Park Outdoor Education Programme 
From  Gerard McLaughlin, Chief Officer of Education (North)  
E-mail liddleh@northlan.gov.uk Telephone 07973726496 
Executive Summary 
Following on from the pilot of outdoor activities for Primary 7 pupils at Strathclyde Park and
creation of a new outdoor shelter for education and events, this report will update on plans
to explore the future upscaling of the programme. 
The report provides an update on the increased number of participants and the range of
activities now available to young people. 
Finally, the report highlights the assistance available to pupils and schools to ensure all
young people can participate. 
Recommendations 
It is proposed that the Education, Children and Families Committee: 
(1) Note development of the programme at Strathclyde Country Park and the ongoing
increase in schools participating. 
(2) Endorse the ongoing development of the programme as outlined in paragraph 2.5. 
(3) otherwise, endorse the contents of the report. 
The Plan for North Lanarkshire
Priority  Support all children and young people to realise their full potential
Ambition statement
(10) Engage with children, young people, parents, carers, and
families to help all children and young people reach their full
potential
AGENDA ITEM 4
Page 29 of 253

Page 30

1. Background 
1.1 Following the closure of Kilbowie Outdoor Education Centre in early 2020, an outdoor
education programme was launched in August 2020 at Strathclyde Country Park
(SCP), offering a 5 day experience for all P7 pupils in North Lanarkshire.  Initially, the
programme was piloted with 1 school per week from August to December 2020, to
comply with COVID guidelines at that time.  29 schools participated in the programme
during the first year. 
1.2 The programme offered free activity weeks for vulnerable pupils and pupils from ASN
schools during the period, January to March 2021, when schools were closed to most
pupils. The Primary 7 pilot programme resumed from April to June 2021, with an
average of 39 pupils per week.  With the programme now back to full operation and
the ongoing development of the experience, outlined below, 111 schools, including
ASN establishments, are booked to take part in the programme during 2022/23
academic year. 
1.3 The costs of Outdoor Education can be met with PEF money, fundraising and parental
contributions. Schools ensure no-one cannot attend due to cost. We encourage all
schools to bring all pupils, even where the school may have concerns over behaviour. 
Activities on offer at SCP, offer curricular enrichment which augments school-based
activity for outdoor education. 
2. Report 
2.1 The programme at SCP is led by a team of staff formerly employed within Active
Schools, supported by a team of coaches.  On average, 70 young people from 2-3
schools attending the programme each week, taking part in a range of activities
including:
•  Bikeability, giving every pupil the chance to reach level where they can cycle
safely on the roads. 
• Orienteering, starting from the new Rainbow shelter co designed with pupils. 
• Watersports activities on fun boats in the loch, supported by the parks
stewarding team. 
• Bushcraft and environmental education. 
• Rowing sessions delivered in partnership with Scottish Rowing, giving pupils
the unique chance to have experience this sport and receive tuition from high
level coaches.
• Highland Games
• Team building
• Archery   
2.2 Since the launch of the programme, the council has invested in development at the
Watersports Centre to support the ongoing development of the programme, with an
area set aside for the for pupils to eat lunch, changing rooms, a drying area, laundrette
facilities and office space. 
2.3 The activities on offer at the park have also developed significantly since 2020. This
has included the introduction of the climbing wall and rowing activities with Scottish
Rowing who are based at the park. 
2.4 Finally, the opportunities available at the Outdoor Education Programme have also
allowed us to continue to support the development of young people in schools and in
further/higher education.  During 2021/22, this included support to the council’s
Page 30 of 253

Page 31

Pathways programme, provision of work experience placements and supporting higher
education placements through New College Lanarkshire and University of Strathclyde. 
We continue to support and develop our programme for Virtual Schools.  This has
continued to be a focus in 2022/23 with more placements available for pupils and
students. 
2.5 Looking to the future, we continue to focus on development of the services on offer at
the Park to support our young people in achieving their full potential.  Over the last few
months, Active & Creative Communities, including Active Schools, have been working
closely with sportscotland to support overall development of our services, including our
provision of Outdoor Education.  We have had excellent feedback from sportscotland
who are keen to support the council to continue to develop our facilities at SCP and
the opportunities available through our outdoor education programme.  We are keen
to consider how we may use our programme to enhance the ASN holiday hub offer
and will look to pilot this approach during 2023/24.  We continue to develop provision
at the park with feedback from pupils, parents and teachers. 
2.6      Financial Position 
2.6.1 As highlighted above, 93% of schools are participating in the programme at SCP during
2022-23, with available slots now offered to secondary schools who have expressed
an interest in attending.  Schools have an option to access external provision through
an approved council framework which allows for access to similar facilities, some of
which may include residential options.  The cost of such is options is approximately
£350-400 per person – significantly more expensive for schools using this option. 
2.6.2 The overall cost of the programme at SCP is supported by core council funding of
approximately £600,000, supported by a Bikeability grant of £19,390, with total delivery
costs of approximately £1,000,020.  This shortfall is managed with payments made by
pupils for the cost of each activity week.  The per head cost is £112. To ensure all
pupils can participate and cost is not a barrier for parents, schools are able to use Pupil
Equity Funding, Scottish Equity Fund monies, fundraising or parental contributions. 
No young person has missed out on the experience due to cost and schools use their
awareness of circumstances to ensure appropriate support is offered. 
3. Measures of success 
3.1  A continued growth in the number of young people participating in activities at
Strathclyde Country Park. 
3.2 A cost effective and inclusive programme which provides young people with the
opportunity to experience a range of outdoor activities, supporting physical and mental
health and wellbeing. 
4. Supporting Documentation 
Gerard McLaughlin
Chief Officer (Education - North)
Page 31 of 253

Page 32

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Ongoing development of the programme need to be managed within the financial
envelope available and in consideration to affordability.  Any developments with
financial implications are fully considered with Financial Solutions. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐ 
Page 32 of 253

Page 33

5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed?
The ACC Risk Register comprehensively covers all project/programme risks and is
managed appropriately.  Rising costs, including transport costs, present a potential
risk to the future of the programme and the team is working with Finance colleagues
to ensure the council is able to offer a financial sustainable and constructive
programme for young people. 
5.10   Armed Forces Covenant Duty          
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.    
does it relate to healthcare, housing or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s?          
Yes                                 No X
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 33 of 253

Page 34

Page 34 of 253

Page 35

P031.1 Getting it Right for Every Child
North Lanarkshire Council
Report 
Does this report require to be approved? ☐ Yes  ☒ No
Ref GMcL Date 28/02/23 
From    Gerard McLaughlin, Chief Officer (Education - North)
E-mail mclaughling@northlan.gov.uk Telephone 
Executive Summary
This report is intended to update committee on the progress of the implementation and
development of the Getting it Right for Every Child (GIRFEC) process, across the
Education and Families Service. The report will update members on new Guidance
regarding GIRFEC published by Scottish Government and how it is reflected in
developments linked to the Roadmap to Recovery, mental health and wellbeing plan for
children in North Lanarkshire. 
The report strengthens the GIRFEC pathway in North Lanarkshire, moving towards an
approach based on planning for children’s wellbeing, linked to national developments. This
approach brings us closer to the local and national vision of children getting the help they
need, when they need it with their rights respected throughout the process. It will also
update members on how a previously reported online tool has been developed to allow
front line practitioners easy access to information on policy, processes and resources. The
progress around the development of early intervention approaches to school attendance,
family support and engagement, and school counselling and staff support will also be
discussed. 
Recommendations
It is recommended that the Education Children and Families Committee: 
(1) endorse the content of this report 
The Plan for North Lanarkshire
Priority Support all children and young people to realise their full potential
Ambition statement (7) Enhance collaborative working to maximise support and ensure
all our children and young people are included, supported, and safe
Education, Children and Families Committee
AGENDA ITEM 5
Page 35 of 253

Page 36

1. Background 
1.1 Members will recall the report to this committee of 13th September 2022 updating
Committee on Getting it Right for Every Child (GIRFEC), the national policy framework
for supporting children and their families in Scotland and related developments in North
Lanarkshire. GIRFEC processes have existed in North Lanarkshire for over 10 years,
but the formation and development of the Education, Children and Families Service
required the redevelopment of existing GIRFEC pathways to fit with revised operating
arrangements. As a result, a GIRFEC pathway was approved in May 2020. Since then,
there have been significant developments around the use of GIRFEC in North
Lanarkshire. 
1.2 As GIRFEC is about all children it requires to sit alongside all developments in
children’s services. The Promise arose from the Independent Care Review and sets
out a range of measures and approaches to improve the experience of children
experiencing care or close to requiring a care experience. One of the main elements of
the promise is the provision of family support and principles of family support are set
out as an integral part of the Promise. Developments around GIRFEC require to align
with developments around meeting the promise, underlining the importance of
integrative practice within Education and Families. 
1.3 The landscape around GIRFEC has often been recognised as complex and diffuse.
This recognises the range of needs of children that this policy must meet, the range of
services that can be used to meet those needs and the developing nature of
understanding of children’s needs and approaches that show evidence of effectiveness
in meeting those needs. The Roadmap to Recovery, which was reported to this
committee in September 2022, gives a structure around these factors and sets actions
to improve approaches to children’s wellbeing with GIRFEC at the heart of these
approaches. 
1.4 The report of 13th September 2022 informed committee of the development of an
electronic tool to be used in clusters and with partners to enhance communication and
understanding of policy, systems and services across the cluster model. This report will
update on progress around this tool. 
1.5 The following report reflects the Wellbeing quality framework, introduced through
previous reports approved by the Education and Families Committee. This introduced
a framework to structure quality wellbeing services which can be summarised around
three questions: 
• Why are we doing it? - Governance and Policy Drivers
• How are we doing it? – Key Systems and Processes
• What are we doing? – Our Outputs and Outcome 
2. Report 
2.1 This report is intended to update committee on developments around GIRFEC in light
of new national guidance and the related elements of developments around provision
of services regarding health and wellbeing. 
2.2 The background information illustrates the broad developments in GIRFEC process
within North Lanarkshire and at national level. The following report will highlight where
further development has taken place across the levels of the Wellbeing Quality
Framework. These developments include:
Page 36 of 253

Page 37

• Why we do it – Developments in National Policy and its links to the Roadmap to
Recovery.
• How we do it - The development of approaches to meeting children’s wellbeing
and early intervention.
• What do we do? - The development of services including family support
approaches linked to school clusters and early years services. 
2.3 GIRFEC National Policy 
2.3.1 The Scottish Government launched an update of the GIRFEC policy in September
2022. This included commitment to the proposed incorporation of the United Nations
Convention on the Rights of the Child (UNCRC into Scots law, to the maximum extent
possible the publication of The Promise and the Plan 21-24 and a continued
commitment to eradicate child poverty. The GIRFEC publications included: 
• Using the National Practice Model, strengthening the use of established models
used in practice around assessment and intervention to improve wellbeing.
• Guidance around the role of the named person, moving from the previously
intended legislative approach to the named person to a policy commitment to offer
this service to children and families where they wished to have this as a first point
of contact.
• The role of the lead professional as the co-coordinator of a multi-agency plan where
this is required.
• Guidance on information sharing consistent with decisions of the Information
Commissioner.
• Statutory guidance on Assessment of Wellbeing – Part 18 (section 96) of the
Children and Young People (Scotland) Act 2014. Which guides professionals on
their duties to assess and support the wellbeing of children and young people. 
2.3.2 The updated guidance stresses a strengths-based approach seeks to realise children’s
rights on a day-to-day basis and is therefore underpinned by key values and principles: 
• Placing the child or young person and their family at the heart of the process,
promoting choice, with full participation in decisions that affect them
• Working together with families to enable a rights-respecting, strengths-based,
inclusive approach
• Understanding wellbeing as being about all areas of life including family, community
and society.
• Valuing difference and ensuring everyone is treated fairly
• Considering and addressing inequalities
• Providing support for children, young people and families when they need it, until
things get better, to help them to reach their full potential
• Everyone working together in local areas and across Scotland to improve outcomes
for children, young people and their families. 
2.3.3 The above developments in the national GIRFEC policy reflect developments in the
practice of GIRFEC in North Lanarkshire and therefore do not require major change to
the local approach, however the new emphasis on rights respecting approaches and
on professionals and services working together, has been particularly helpful in
developing local processes around integrative practice with the cluster model. 
2.4 Integrative Practice 
2.4.1 In late August 2022 the new online tool Empowering Our Clusters - A Guide to
Integrative Practice was launched with a partnership event to promote the use of the
Page 37 of 253

Page 38

tool. This online resource provides a single source of information for practitioners
working with children and families around the cluster model. Information is provided
around resources process is and relevant policies. This is an important tool in the
delivery of work with children and families following the GIRFEC model. 
2.4.2 As part of the suite of information provided within this online tool a new pathway and
guidance on planning for children’s well-being has been developed to update the
previous GIRFEC pathway. This updated key process document is attached to this
report in Appendix 1. The new guidance takes forward the emphasis in national policy
on rights respecting approaches through an individualised planning process that places
children young people and families at the centre. As part of the development of the
Integrative Practice and GIRFEC approaches, the Early and Effective Intervention
approach to young people in conflict with the law is being aligned with the GIRFEC
pathway. This is the subject of another report to this committee. 
2.5 The Roadmap to Recovery 
2.5.1 The Roadmap to Recovery plan sets out a way forward in developing the health and
wellbeing of our learners over the next three years recognising the current context in
North Lanarkshire, particularly following the impact of COVID19. The plan recognises
the importance of developments in North Lanarkshire in relation to health and wellbeing
including the Empowering Clusters model and the GIRFEC pathway. It looks at high
level outcomes that can be improved, linking into the Integrated Children Services Plan
and the Plan for North Lanarkshire. It also looks at improvements in day-to-day
operations and presents a format intended to assist schools, centres and teams to
improve health and wellbeing in line with quality indicators currently used in
improvement plans. 
2.5.2 The GIRFEC approach and pathway is identified in the plan as the key approach to
delivering improvements in children’s wellbeing. The three-stage model of intervention
used in this plan fits well with the updated national policy development which promote
the development of early intervention approaches. The model is based on the following
stages: 
• Universal – reflecting the services available to all children 
• Additional – where early intervention supports are introduced for targeted children
and families
• Intensive – where multi-agency planning, and intervention become the basis for
support to meet significant need. 
2.5.3 Within the Roadmap to Recovery a number of areas for development are identified
which sit at the additional level of support, and in terms of the Wellbeing Quality
Framework are good examples of what we do to achieve better wellbeing for our
children and young people. Some of these are: 
• School attendance
• Family support and engagement
• School based counselling 
2.6 School Attendance 
2.6.1 Members may recall that an update regarding the Scottish Attainment Challenge and
Pupil Equity Fund was reported to this committee in November 2022. This report
reflected the changing national picture around these areas of investment, with a
Page 38 of 253

Page 39

move to the Strategic Equity Fund, showing a reduction in funding for North
Lanarkshire year on year, up to financial year 2025/26. Stretch aims related to the
fund are required as specific local authority targets related to attainment and health
and wellbeing of children and young people. 
2.6.2 Following the unavoidable disruption to school attendance that occurred during the
COVID-19 pandemic attendance rates have been a concern. Low school attendance
has a well-established relationship with both health and wellbeing needs and lower
attainment in children and young people. Improvements in school attendance were set
as a stretch aim for North Lanarkshire with targets for increases set at 2% for the
primary sector and a 3% at secondary, by June 2023. 
2.6.3 In order to monitor this, a tracking process has been developed looking at school
attendance across all sectors and the whole authority. This has shown that up until
December 2022 attendance rates rose by 2% based on the figures for the full school
year 2021/22, however are still down on the 2019 attendance rates (Appendix 2). The
monitoring also shows that attendance is lower among children from lower SIMD areas
and children from care experienced backgrounds, illustrating an association between
deprivation and lower attendance. As indicated in the Roadmap to Recovery, a family
support model is being developed alongside work carried out by schools, to improve
family engagement and attendance. Attendance will continue to be monitored as part
of the work to implement and evaluate this approach. 
2.7 Family Support and Engagement 
2.7.1 The report to committee in September 2022 highlighted that eighteen posts have been
created through the use of Scottish Attainment Challenge funding to work around the
school clusters with a view to supporting families to maximise school attendance of
their children and minimise exclusion. This follows a key theme in the Roadmap to
Recovery around the development of family support approaches as an additional level
intervention, particularly aimed at improving school attendance and inclusion. 
2.7.2 Ten of the eighteen posts have now been recruited and five have now started. Further
interviews are planned to recruit the remainder of the staff. In order to monitor the
effectiveness of these posts, an attendance monitoring system has been set up. This
will look specifically children being worked with through the family support model and
will allow direct comparison of their attendance with the overall attendance monitoring
information discussed above 
2.8 School Based Counselling 
2.8.1 Development of School based counselling was an action identified in the Roadmap to
Recovery. School based counselling is currently well used with a spend of 97%
achieved in financial year 2021/22 and latest data covering July to December 2022
(Appendix 3) shows 1366 children and young people received the benefit of
counselling support. These figures illustrate the demand for counselling services. An
issue that has arisen is that some clusters are operating waiting lists due to demand
for counselling access due to demand across cluster not being evenly spread. 
2.8.2 To further ensure schools are using the funding appropriately and timeously to meet
the needs of children and young people in NLC, a new Policy has been developed to
highlight best practice to be followed to ensure equitable access to counselling
services. This sets school-based counselling as being best implemented when it is part
of an integrated pupil support system, and part of a GIRFEC staged intervention
approach. This will embed school-based counselling in an integrative practice model.
Page 39 of 253

Page 40

2.8.3 A counselling in schools check in has been introduced from November 2022 and is
planned three times a year to be completed by cluster chairs and the Secondary Head
Teacher as part of the Secondary Improvement Plan activities. The purpose is to
support planning and provide more robust information to ensure targets from provision
reviews can be better achieved. Subsequently, it can also be used as a tool to support
improvement. It will allow for targeted support to ensure equitable cluster planning and
is also a vehicle for collecting observational evidence of the impact of the service. 
2.9 Staff Training, Wellbeing and Support 
2.9.1 To ensure that staff are skilled, and have the capacity to deliver on GIRFEC, staff
training is an important area to consider. To this end, we now deliver a Pupil Support
Leadership Programme, endorsed by Education Scotland. This programme provides
training on all the necessary aspects of understanding and delivering effectively
through our GIRFEC Pathway. Additionally, two further training programmes – ‘An
Introduction to Pupil Support’ and ‘An Introduction to Counselling Skills’ – have recently
been developed to underpin this area of work further. 
2.9.2 Staff support is an important element of providing support to children and young people.
A new Staff Wellbeing Education Support Officer (ESO) took up post in August. This
role helps to support the Roadmap to Recovery. The model recognises that to achieve
the vision of this plan we must support staff wellbeing as this is essential for the
consistent delivery of quality services to children, young people, families and
communities. 
2.9.3 The ESO has been introduced to Heads of Schools and Centers at meetings and
details distributed to workforce in Education. Staff from across all sectors and at all
levels have reached out for signposting and support. Signposting has been towards
resources, courses, and support services to help meet the range of physical, mental,
and emotional challenges they may be experiencing. The signposting takes place via
a range of channels including NL Life/ Work Well NL and Health and Wellbeing
Champions. 
2.10 SDQ Survey 
2.10.1 In November 2022, this committee supported the further use of the Strengths and
Difficulties Questionnaire (SDQ) following it’s initial use in 2020. This would allow the
gathering of comparative data from the initial baseline, which would be useful in
measuring progress in children’s wellbeing in schools and planning further
developments around the use of the GIRFEC pathway. 
2.10.2 Since that date a group of officers has been in discussion with Youth in Mind, the
company that holds the rights to SDQ, and a timeline for the running of the survey a
second time has been developed. This builds in a two-month period required by Youth
in Mind, following the uploading of initial data around school cohort numbers, which is
required for preparing the electronic systems to allow questionnaires to be issued for
each individual pupil and completed online, through a secure process. Key dates and
actions are: 
• Early February 2023 - Uploading initial data for to Youth in Mind for preparation and
issue of questionnaires by
• Late February 2023 – Updating of guidance materials for issues to schools
• March 2023 - Providing briefings to schools regarding the questionnaires,
supported by issue of guidance materials
Page 40 of 253

Page 41

• April – June 2023 – Questionnaires completed in schools by young people
(secondary school) and teachers (Primary School)
• July and August 2023 - Analysis of data carried out 
2.10.3 Following this process, a report will be provided to this committee with full analysis
and comparisons with the 2020 data. 
3. Measures of success 
3.1 The report shows several developments that will require to be monitored over the next
year. Overall, these developments reflect the vision, discussed above, that is in place
for the GIRFEC approach. 
3.2 In terms of monitoring the process of GIRFEC and the strengthening of the pathway
through the introduction of the Planning for Children’s Wellbeing model, monitoring will
take place through evidence of the use of the model within the clusters. Numbers of
children assisted through this model will indicate the outputs of the GIRFEC processes. 
3.3 Attendance monitoring will continue as set out in this report and in Appendix 2. This will
show outcomes of the approaches used to improve attendance across the authority.
Comparison of this and similar data from the families being worked with by the Family
Engagement staff will allow monitoring and evaluation of the outcomes of the family
support and engagement model. 
3.4 School based counselling check ins will show evidence of use and development of
School Based Counselling. 
4. Supporting documentation 
4.1 Appendix 1 – Planning for Children’s Wellbeing Guidance 
4.2 Appendix 2 – Attendance Analysis 
4.3 Appendix 3 – Counselling in Schools. 
Gerard McLaughlin  
Chief Officer (Education - North) 
Page 41 of 253

Page 42

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
The Family Engagement Support Assistant Posts have been funded, initially until
the end of March 2024, through the Scottish Attainment Challenge. This has been
approved through the Workforce Steering Group. As indicated in 2.11 above this is
a reducing financial envelope and the funding and effectiveness of this approach
will have to be revisited before March 2024.
5.3 HR policy impact
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact
Does the report / project / practice contain or involve the processing of personal
data?
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk
Yes ☐ No ☐
Page 42 of 253

Page 43

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The use of the new approach to Planning for children’s Wellbeing as the basis for
delivery of GIRFEC requires communication across all service that work with
children. This has already started with the launch of an online tool covering all
required resources. This will be further developed and updated as required.
5.9 Risk impact   
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
As part of the SAC activity, the future of Family Engagement Support Assistant posts
and the related family support approach poses a risk going forward, Given the stretch
aims around improving attendance, the risk of failing to achieve or sustain these
stretch aims must be considered. 
The risk associated with the implementation of SAC is regularly reviewed in line with
Council arrangements. The most recent internal Audit report gave assurance as to
the efficacy of SAC planning arrangements. Due to the downward taper of current
funding within the Strategic Equity Fund, close scrutiny of outcomes from this
initiative will take place to assist decision making around future achievement of the
stretch aims.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
Page 43 of 253

Page 44

1 
Appendix 1 
Empowering Clusters Guidance 
Guidance on planning for children
and young people’s Wellbeing 
August 2022 
Key content: 
1. Introduction 
2. GIRFEC Pathway for Planning and Support 
3. Wellbeing Planning Meetings for Children and Young People 
4. Requesting additional supports/resources for a
child/young person’s unmet wellbeing needs 
5. Alignment to other planning process 
6. Useful links and information 
7. Alignment to other planning process 
Alig
n
Page 44 of 253

Page 45

Empowering Clusters Guidance
2  
1. Introduction
The model of cluster working allows for the needs of children to be met through a joined-up approach
to children’s services. The model, which replaces the HART process and is the same for primary and
secondary, is built around the 23 educational clusters which includes secondary school, the feeder
primary schools, early years establishments, SEBN and ASN provision within the cluster area. The
model centres on integrative practice within and across agencies using staged intervention to plan for
individual children and young people and their family at the earliest opportunity. This approach to
planning will help to identify what needs to be done to improve the child/young person’s wellbeing
and what support is necessary to meet identified outcomes. 
The principles and values are those underpinned by the UNCRC, ‘Getting it right for Every Child’, All
our Children, all their Potential (Morgan Review), The Promise 2020 and the Review of National
Guidance for Child Protection in Scotland 2021 and align to the following themes: 
• Rights and Participation
• Relationships
• Wellbeing and Care
• Inclusion and Universal Support
Here’s a short interactive presentation on
‘Introducing Children’s rights’. 
You can access this e-learning on Assessment and
Planning for Children and Young People. 
The term children and young people (usually for over-12’s) is used to describe anyone up to the age
of 18 years, however the GIRFEC approach is applicable to assessment and planning for the wellbeing
of unborn babies and certain groups of young people aged over 18. This includes situations where a
young person is still enrolled at school, where they are moving through the transition into Adult
Services, and where they have care experience. 
‘Parent’ when used in this guidance has the same meaning as in the Education (Scotland) Act 1980
and the Children (Scotland) Act 1995, to include any person who is liable to maintain or has parental
responsibilities in relation to or has the care of a child. Use of the term ‘parent’ therefore means parent
or parents, carers, or guardians, and recognises these may be part of any family network. 
Policy and legislation
Policy and legislation around planning for children and young people’s wellbeing is complex and wide
reaching. This reflects that it covers those at the universal service end who require no specific
intervention to those with the highest levels of need in receipt of very complex packages. It also covers
the breadth of service offered. 
The following are intended to give examples of the legislation and policy requirements that impact on
the delivery of services to children covered in this model. It is not intended to be a complete list. This
includes: 
• The Children (Scotland) Act 1995
• The Children and Young People (Scotland) Act 2014
• Education (Additional Support for Learning) (Scotland) Act 2004
Page 45 of 253

Page 46

Empowering Clusters Guidance
3  
• The Promise 2020
• The National Child Protection Guidance 2021
• The Children (Scotland) Act 2020 enshrines UNCRC in Scottish legislation 
A Relationship-based Practice Approach 
All services and agencies involved with children, young people and their families are committed to
developing positive relationships built on transparency, trust, inclusion, and respect. Recognition of
diversity and appreciation of differing family backgrounds and cultures is key to achieving the best
possible outcomes for an individual child or young person. 
Families know their home situations best and can be key to finding the solutions to challenges
children, young people and parents may face. Improved outcomes are achieved by adopting a
relationship-based practice approach, which draws on professional skills, knowledge, and expertise
and uses innovative and creative ways to engage with families. 
Trauma Informed Practice (TIP) 
The trauma-informed practice toolkit has been developed as part of the National Trauma Training
Programme and can support all sectors of the workforce in planning and developing trauma informed
services. The model is grounded in and directed by a complete understanding of how trauma exposure
affects service user’s neurological, biological, psychological, and social development. 
The key principles of TIP
Page 46 of 253

Page 47

Empowering Clusters Guidance
4 
peer support and mutual self-
help.
Efforts are made by an
organisation to ensure the
physical and emotional safety of
clients and staff. This includes
reasonable freedom from threat
or harm and attempts to prevent
further re-traumatisation.
Safety
Transparency exists in an
organisation’s policies and
procedures, with the objective of
building trust among staff,
families and the wider
community.
Trustworthiness
Families and staff have
meaningful choice and a voice
in the decision-making
process of the organisation
and its services.
Choice 
The organisation recognises
the value of staff and
families’ experience in
overcoming challenges and
improving the system as a
whole. This is often
operationalised through the
formal or informal use of 
Collaboration
Efforts are made by the
organisation to share power and
give families and staff a strong
voice in decision-making, at both
individual and organisational
levels. Although there may be
differences in terms of their
application, it is widely
acknowledged. 
Empowerment
Points to remember throughout the planning process 
2. GIRFEC pathway for planning and support
The GIRFEC Pathway for Planning and Support is attached below to enable you and your staff to
familiarise themselves with Education and Families agreed practice to support effective planning for
our children and young people. 
Contextual Safeguarding Child protection
Page 47 of 253

Page 48

Empowering Clusters Guidance
5 
In 2021-22, NL partners introduced the
contextual safeguarding approach.
Contextual Safeguarding is an approach to
understanding, and responding to, young
people’s experiences of significant harm
beyond their families. It recognises that the
different relationships that young people
form in their neighbourhoods, schools and
online can feature violence and abuse.
Access this ’What is Contextual
Safeguarding’ video for more info.
Where a potential Child Protection
concern emerges at any stage of
involvement with a child, young person
or their family, agency protocols must be
followed.
To seek help or share concerns for a child
or young person’s safety please contact
the police if there is immediate risk of
the child being harmed or the relevant
locality social work children and families
team. 
3. Planning for Children and Young People’s Wellbeing
GIRFEC aims to support and promote a child/young person’s wellbeing by making sure they have
access to the right support when they need it. 
For any level of planning and intervention the first step is to undertake an assessment to establish
areas of need, risk, resilience, and strength. The Named Person will plan by recording actions against
wellbeing outcomes and review this to see if the plan has been effective in reducing need and
promoting resilience. 
If there are continuing wellbeing needs unable to be resolved by single agency led planning then the
Named Person may decide, in consultation with parents/carers and the child/young person, that
planning needs to take place at a meeting level. The Named Person will then arrange a child/young
person wellbeing meeting 
Planning meeting 
A Child/young person’s Planning Meeting may be called when one or more of the following apply:
Page 48 of 253

Page 49

Empowering Clusters Guidance
6  
Consider wellbeing
needs, and potential
risks to the child/young
person 
Hear the views of the
child/young person and
their parents/carers 
Share and collate
assessment information
about the child’s/young
person’s wellbeing 
Consider whether a
Request for Assistance
to a specific service(s)
would be helpful
Consider whether a
child’s plan is required
to co-ordinate input
from the involved
services
Consider whether a
multi-agency
chronology would
support ongoing
assessment & planning 
Identify a Lead
Professional if a
Child/young person’s
Plan is agreed 
Arrange a review
meeting date if a
Child/young person’s
Plan is agreed 
1. The assessment of a child’s/young person’s wellbeing suggests that their needs are more
significant
2. It is not clear that a request for assistance to a specific service will be sufficient to improve
outcomes
3. The involvement of another service following a request for assistance has not adequately
addressed the presenting needs of the child/young person
4. There is a need for co-ordinated assessment and planning between 2 or more services. It is a
responsibility of the named person to co-ordinate planning; therefore, it is likely that they will
initiate a child/young person wellbeing meeting with the agreement of the child/young person,
their parents/carers, and any other involved service. If another service considers that there is a
need for a Child/young person Wellbeing Meeting to take place they should discuss this with the
named person and agree on how to proceed. 
The main purpose of a child/young person’s planning meeting is to: 
Page 49 of 253

Page 50

Empowering Clusters Guidance
7  
For further consideration in planning
In addition to the above, planning for a child/young person might involve local dialogue about the
following: 
• ensuring partners all are aware of staffing issues and maintaining links and connections
• managing the GIRFEC process and emerging issues
• managing requests for assistance and thresholds for social work involvement
• capacity issues affecting teams
• ensuring the effectiveness of family group decision making
• the progress of vulnerable children and families
• reviewing the data available on the effectiveness of interventions (Outcome Star) and wider
data around performance (safeguarding, the balance of care, attendance patterns, outcomes
of VSEs and inspections). 
Staged intervention 
Key throughout all stages of planning and intervention is the cycle of assess > plan > review. The
named person will lead and co-ordinate planning for children/young people until a wellbeing meeting
has agreed and identified a lead professional when the level of planning requires someone to take on
this role.
Page 50 of 253

Page 51

Empowering Clusters Guidance
8  
The first point of contact for any child or young person with wellbeing needs,
will be the named person. In keeping with the GIRFEC pathway, supports at
universal level will be provided in early years, school, may be independently
offered by the NHSL and can be a collaboration of the two universal services. 
The named person provides a clear point of contact for anyone worried about a child/young person’s
wellbeing. They have a responsibility to collaborate and discuss with the child, family, and other
agencies to explore support available to address identified wellbeing needs. The named person should
make families aware of their rights around information sharing as per this guidance. 
When it has been identified that early help/support is needed for a child or young person, the named
person, in collaboration with the child, young person, parent, will analyse unmet need using the single
agency wellbeing assessment and this will inform the development of a single agency led plan (GIRFme
plan for education). The named person will review and update the plan to make sure the child’s needs
are met and wellbeing improved. 
The named person can at any time have a professional dialogue with another professional within
their own service or another universal service. 
If necessary, a request for assistance, can be made. Good communication helps provide as full a
picture as possible for assessment, can aid decision making, and help clarify whether a request for
assistance would benefit a child or young person through accessing extra support. 
If the current plan has had a positive impact and the child’s wellbeing is improved, then going forward,
additional planning may not be necessary as the child’s needs are being met within universal provision,
health, early years, school. See the Planning for Children’s Wellbeing (Universal) summary guide on
the next page.
Page 51 of 253

Page 52

9 
Empowering Clusters Guidance 
Summary guide Planning for Children’s Wellbeing (Universal) 
Page 52 of 253

Page 53

10 
Empowering Clusters Guidance 
Planning Meeting (Additional) 
When the named person has identified wellbeing concerns cannot be met within universal services
and a single agency led plan alone, consideration needs to be given to what additional support is
required. 
The named person can have a discussion with the Cluster Integration and Improvement Lead as
required (CIIL-this is an educational post but available for professional dialogue with health colleagues
or those from other services who have wellbeing concerns for a child). Wellbeing needs are likely to
be met and managed within school but need support from partner services and agencies. 
The ‘My World Triangle’ assessment may be initiated to analyse unmet need and if required a
Planning Meeting will be arranged by the Named Person and the assessment and analysis shared.
(See earlier section on wellbeing meeting). Engagement with the child/young person and their family
is crucial and tools to seek views should be used. 
Wellbeing needs may continue to be met and managed within school with support from partner
services and agencies but if the assessment informs the need for a Child’s Plan, then the most
appropriate Lead Professional should be identified to oversee the plan. 
• The planning meeting should discuss clearly whether the level of integrated working requires
a Lead Professional at this point. Duties of a Lead Professional include co-ordination of the
child’s plan; ensuring everyone in the team around the child is clear about roles and
responsibilities; ensuring children and families are involved and supported; ensuring everyone
involved has a copy of the plan and it is reviewed/monitored regularly. 
If there is disagreement about the need for a Lead Professional or who should fulfil the role, then
the CIIL/Senior Social Worker can be approached to help resolve this. 
See the Planning for Children’s Wellbeing (Additional) summary guide on the next page.
Page 53 of 253

Page 54

11 
Empowering Clusters Guidance 
Summary guide Planning for Children’s Wellbeing (Additional) 
Page 54 of 253

Page 55

12 
Empowering Clusters Guidance 
Planning Meeting (Intensive)
A Planning Meeting should take place to prevent further escalation, when the concerns are such that
the child, young person is, for example, on the ‘edges of care’. Other examples might be children who
have been hospitalised with restricted eating, have returned from out of authority care or have come
off the child protection register. This meeting can facilitate further assessment and interventions from
additional staff from other agencies. 
Children and Young People may already have an identified Lead Professional but if not, then a Lead
Professional should be identified, and they will: 
• Co-ordinate the Child’s Plan
• Ensure children and their families are involved and supported
• Ensure everyone in the team around the child are clear about their role
• Appropriate services are provided
• Ensure child’s plan is monitored and reviewed
• Arrange reviews of the child’s plan 
See the Planning for Children’s Wellbeing (Intensive) summary guide on the next page.
Page 55 of 253

Page 56

13 
Empowering Clusters Guidance 
Summary guide Planning for Children’s Wellbeing (Intensive) 
Page 56 of 253

Page 57

Empowering Clusters Guidance
14 
4. Requesting additional supports/resources for a child/young
person’s unmet wellbeing needs
If a planning meeting (intensive) is being convened to discuss additional resourcing which are unable
to be accessed by the team around the child/young person currently then this meeting will be chaired
by the Cluster Chair who can have a dialogue and/or seek support from the Education and Families
Manager Social Work. 
The purpose of this discussion is to seek support for problem solving if insufficient progress is being
made. The plan may be ‘stuck’ despite support from the team around the child and there are barriers
which need further reflection, including the possibility of additional resources which will be
proportionate to the needs of the child. 
This meeting can agree resources to enable the most vulnerable children to have access where
possible to community based education, health, and social work support services or when additional
or alternative resources are required to maintain the education placement and to enable the
child/young person to be supported by their family. 
The planning meeting can: 
• Approve additional resources from within the cluster or within authority to support a
child/young person’s plan
• Act as a problem-solving group where barriers arise in supporting a child’s plan
• Agree if progression is necessary to change the level of intervention
• Agree a review date if necessary 
Outwith Term Time 
Planning issues for children, young people and their families may need to continue out with the school
term. If a plan is already in place, it should be reviewed prior to the school term finishing and updated,
including additional resources to maintain the child, young person and support the parents during the
holiday period. 
Inclusion Team are available over the school holidays and can be contacted via ef.sfl.northlan.gov.uk
if an education input is required to support the child/young person’s plan. Education and Families
Managers in Education will also be available
Page 57 of 253

Page 58

Empowering Clusters Guidance
15 
5. Alignment to other planning processes
Core Group: Further Support 
• Should further support be felt necessary in discussion with the CIIL, a request for assistance
can be made to the Inclusion Core Group at ef.sfl@northlan.gov.uk
• The Core Group normally meets on a monthly basis during the academic year.
• Requests to Core Group should provide the background to the situation, a clear outline of the
support being sought, details of any associated costs and strategies / timescales for reviewing
the interventions.
• Feedback on such requests will be given as soon as possible in the days following the meeting. 
Care experience at home 
Where a child/young person has been experiencing care at home (subject to compulsory supervision)
then social work, as the lead agency, has internal processes to review the child on a multi-agency basis.
A child, young person who has been experiencing care at home will also be reviewed by a children’s
hearing 12 monthly or sooner. 
When a child or young person is no longer subject to compulsory supervision then their wellbeing
needs will continue to be met within the wellbeing planning process. 
The named person or lead professional (whichever has been agreed) will lead on the
assess/plan/review cycle 
Care experience away from home 
At the point of a child/ young person returning to the care of their parent (the decision of a looked
after review), the social worker as Lead Professional and the team around the child will update the
Child/young person’s Plan, with agreed interventions to support wellbeing. 
The level of intervention- universal, additional, or intensive will be agreed. The CIIL, if necessary, will
discuss with the senior social worker to determine the level of staged intervention. 
Child Protection De-Registration 
If the child, young person is not subject to a compulsory supervision order and the chair of the review
child protection conference (the locality education and families manager) makes a decision to
deregister a child/young person then the level of intervention- universal, additional, or intensive, will
be agreed at the child protection conference. 
The named person or lead professional (whichever has been agreed) will lead on the
assess/plan/review cycle
Page 58 of 253

Page 59

Empowering Clusters Guidance
16 
6. Useful links and information
 www.girfecinnl.com 
 Interim Information Sharing Guidance (PDF) 
 NL Chronology Multiagency Practice Guidance (PDF) 
 Care Inspectorate – Practice guide to Chronologies (PDF) 
 SidandShanarri.co.uk 
 Download Wellbeing Web (PDF) 
 What I Think Tool – Early Years (PDF) 
 What I Think Tool – Children (PDF) 
 What I Think Tool – Young People over 16 (PDF) 
 Outcome Star – see note below and signpost to further guidance 
Education and Families are introducing Outcome Star, with a programme of training being
developed, from April 2022. The ‘star’ is an evidence based tool which will help us identify what
is impacting on a child, young person’s wellbeing and what we need to do to support change. The
use of the ‘star’ over a period of time, identifies what has changed across the child, young person’s
wellbeing, if they are safer, healthier, more able to participate etc, a visual record for the child,
young person, family, and any professional offering support to make changes. 
See the HWB guidance section in this Empowering Clusters Guidance resource for more details
on the ‘Use of outcome star’.
Page 59 of 253

Page 60

Appendix 2 
Page 60 of 253

Page 61

Appendix 3 
Page 61 of 253

Page 62

Page 62 of 253

Page 63

North Lanarkshire Council
Report
Education, Children and Families Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref   GMcL/MD Date 28/02/23 
Proposals for statutory public consultation on the proposed new
build for Gartcosh Primary. 
From  Gerard McLaughlin, Chief Officer (Education - North)  
E-mail mclaughling@northlan.gov.uk Telephone  01236 812 221 
Executive Summary
This report outlines proposals for statutory public consultations on the proposed new build
for Gartcosh Primary. 
If approved, a statutory consultation will take place involving all statutory consultees, other
stakeholders and interested parties. 
The key reasons for this proposal are: 
• The council is progressing its Town and Community Hub programme and this
consultation proposal for Gartcosh Primary follows from the Committee Report on
Schools and Centres 21 Phase 3 Investment approved at Education Committee on
1st March 2017. 
• The pupils currently at Garcosh Primary School will benefit educationally by
attending a new build school which can offer a wider range of educational
opportunities. 
Recommendations 
It is recommended that the Education, Children and Families Committee: 
(1) Endorse the contents of the report;
(2) Agree that a formal consultation take place on the proposed new build for Gartcosh
Primary;
(3) Endorse the attached statutory consultation document appendix 1;
(4) Agree the timeline for consultation outlined in appendix 2 of this report.  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (22) Facilitate a North Lanarkshire wide approach to asset
rationalisation, including with communities and partners
AGENDA ITEM 6
Page 63 of 253

Page 64

1. Background 
1.1 Schools (Consultation) (Scotland) Act 2010 
The provisions of the above Act place a statutory duty on education authorities to carry
out formal consultations on new build proposals for schools when the proposal is to
build the school out with its current curtilage or when a joint campus is proposed
involving a non-denominational and a denominational primary school. 
1.2 The Act requires education authorities prepare an educational benefits statement, to
prepare (and publish) a proposal paper in respect of any proposal which falls within the
terms of the Act, give notice of the proposal to the relevant consultees (and invite
representations) in accordance with the Act, to hold (and give notice of) a public
meeting, involve Education Scotland. 
1.3 Following the period of consultation, the education authority must review the proposal
in accordance with the Act and prepare (and publish) a consultation report in
accordance with relevant sections of the Act. 
1.4 After publication of the education authority report, HMIE publish a report on the
consultation taking account of the previously published education authority report
before a final decision is made by the Council. 
1.5 The Service will undertake a statutory consultation on the proposed relocation of
Gartcosh Primary to a new location. Appendix 3. 
1.6 Proposals outlined in this paper have been developed by Education and Families
Managers including staff from the Early Learning & Childcare team, the Inclusion team,
Assets and Procurement and Corporate Finance. Key considerations derived from
these meetings have been incorporated into the models proposed, which include: 
• Quality and condition of the fabric of school buildings
• Possible savings/costs associated with estate re-purposing and school relocation
• Impact assessment and improvement planning for the ASN sector.   
1.7 The Service has adopted a formal project management governance structure to lead
and monitor the delivery of new build schools which will encompass the achievement
the programme and the savings. 
1.8 The final decision of the education authority is subject to review and possible call in by
the Scottish government which must operate to a strict timeline set out in Appendix 2. 
1.9 The timeline mentioned above may be subject to review due to unforeseen
circumstances. 
2. Report 
2.1. The council is progressing, through the Town and Community Hub programme budget
allocation, a new build Gartcosh Community Hub which will include 434 primary school
spaces at a new location and thereafter relocate Gartcosh Primary School to this new
Community Hub.  As members will be aware, Gartcosh is part of a Community Growth
Area and is experiencing increased demand to the school estate as a result.  The
current location does not have sufficient space on which to expand to create the
capacity required, therefore a new school, at a new location is proposed. A statutory
education consultation is required to relocate a primary school to the new location. 
Page 64 of 253

Page 65

2.2. There are various reasons why a new build is prioritised: “Legacy” projects which are
carried over from previous school build programmes such as “Schools and Centres 21”;
“Capacity” projects which are required due to significant increased pupil populations
and subsequent additional spaces required within catchment schools; and “Policy”
projects which are brought forward due to alignment with the prioritisation matrix linked
to the Town and Community Hub programme.  Gartcosh Community Hub is both a
legacy, and a capacity related project, and as such is prioritised within the 2021-2026
capital allocation for this programme of work. 
2.3. This report establishes the methodology by which the services redesign was envisioned
by officers, in response to the Council’s priorities. A core team of officers in Education
and Families assessed a range of propositions to establish their viability, using a RAG
status approach to highlight most promising options for implementation. 
2.4. A number of factors were used to establish an approach to prioritising potential
rationalisation activities. These are described in the following section. 
2.5. Strategic fit with the priorities of the Plan for North Lanarkshire; 
2.5.1 Whilst this project predates the creation of the Town and Community Hub programme,
all projects not yet designed will follow the six guiding principles attached to the Town
and Community Hub programme.  As such, in addition to the requested Statutory
Education Consultation, there will be effective engagement with both the school and
the wider community throughout the design stage of this project – should it be approved
to proceed following Statutory Consultation. It is proposed that the intelligent brief
process, which facilitates engagement with the stakeholders, would not wait until the
education consultation is concluded but will be ‘delivered at risk’.  It is not the case that
the outcome is predetermined – hence the ‘at risk’ proposal.  The council is looking to
deliver a new facility as soon as practically possible, due to pressures at the existing
establishment. However, it should be noted that should the outcome of the statutory
education consultation conclude that the proposal should not be progressed, the work
on the intelligent brief would cease. 
2.6. Alignment with the Community Growth Area proposal; 
2.6.1 It has been evident for many years that a new build primary school is required to
mitigate the impact of new housing on the school estate.  The issue to date has been
the lack of available land on which to build a new Community Hub. Due to the
constraints of the existing site, it would not be possible to create a school of sufficient
size to serve the needs of the growing school population.  Unfortunately, the council
did not own sufficient land in this area, and it has taken years of complex negotiations
with landowners to acquire a site suitable to build a new Community Hub.  The
proposed new location has been determined as the council now owns this land. 
2.7. Growth in the wider Northern Corridor area; 
2.7.1 Whilst there is extensive growth in Gartcosh, there has also been growth in other areas
of the Northern Corridor over the years, including in Stepps, Chryston, and
Moodiesburn.  This increased population places demand on other sectors within
education, in addition to primary provision.   
2.7.2 A new build primary school is near completion, and an extension to the high school is
expected to follow.  However, to serve the needs of both the Additional Support Needs
(ASN) community, and the early years community, it is proposed that spaces are
included in the Gartcosh Community Hub for both these sectors.  Whilst this does not
Page 65 of 253

Page 66

form the need for a statutory education consultation, which is needed solely due to the
proposal to relocate the existing Gartcosh Primary School, it will form part of the
consultation with the school and wider community as part of the discussion in relation
to the Community Hub proposals. 
2.8. Relocation of Existing Establishments within Alternative/Higher Quality
Facilities 
2.8.1 In line with the policy established in the Plan for North Lanarkshire to ensure that young
people are catered for within high-quality facilities, it is also proposed that consultation
takes place to strengthen the provision experienced by pupils in Gartcosh Primary
School. Each of these propositions is outlined in what follows.  
3. Measures of success 
3.1 Stakeholder support for the options brought forward. 
3.2 Successful implementation of planned proposals. 
3.3 Achievement of budget savings target in line with approved budget savings agreed by
Council March 2020 
3.4 Greater alignment with Plan for North Lanarkshire community hub model. 
3.5 Improved quality of service and provision to effectively meet the needs of children,
young people and families 
3.6 Increased numbers of children and young people remaining within their local
community.   
4. Supporting documentation 
4.1       Appendix 1 Statutory Consultation Gartcosh Primary
4.2 Appendix 2    Statutory Consultation Timeline 
4.3 Appendix 3 Location plan 
Gerard McLaughlin
Chief Officer (Education - North)  
Page 66 of 253

Page 67

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
An Equality Impact Assessment has been completed and will underpin planning for
these proposals, since a number of the young people involved are considered as
being from a protected group, due to disability. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Service is currently assessing the value of this capital investment with support
from colleagues in Asset and Procurement Solutions. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Affected staff will be managed in accordance with the appropriate Workforce
Change Policies and in with the signatory trades unions.  Considerations would
include Compulsory Transfer, Premature/Early Retirement,
Redundancy/Redeployment.
The Service would be required to follow the requirements for consulting as set out
in the Schools (Consultation) (Scotland) Act 2010. Further stakeholder, community
and parental consultation would be required in the event that the Service proceeds
with any of the recommendations. An indicative timeline for the consultation
process is outlined in Appendix 2.
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact
Page 67 of 253

Page 68

Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☒
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐  
The carbon footprint will reduce if the numbers of establishments operating was
reduced and pupils were catered for in our newer and more energy efficient
campuses. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
A Programme Board has been established for the Implementation of the ASN
Review. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
Page 68 of 253

Page 69

Appendix 1 
Statutory Consultation 
Proposal to build a new Gartcosh Primary School and to
incorporate a Language & Communication Support Centre (LCSC)
and Early Learning and Childcare (ELC) provision 
EDUCATION AND FAMILIES 
Page 69 of 253

Page 70

NORTH LANARKSHIRE COUNCIL: EDUCATION AND FAMILIES 
Proposal to build a new Gartcosh Primary School and to incorporate a Language &
Communication Support Centre (LCSC) and Early Learning and Childcare (ELC)
provision 
1.         INTRODUCTION 
Gartcosh Primary School is a non-denominational primary school which was built in
1913 and is located in Lochend Road, Gartcosh. Seven miles east of Glasgow City
Centre and seven miles west of Cumbernauld. The present school building was opened
in 1913; it is a traditional two storey stone construction with pitched and slated roof.
Within the building there are seven classrooms off the central hall. The administration
block is situated upstairs, and the school dinner hall is outside in the playground in what
was the original school building (dated 1875). There is also a modular until within the
school grounds which has temporary accommodation for two classrooms. 
The school capacity of the school is 188 with the current roll of 250, which includes 62
spaces created through the temporary two class modular unit. 
It is recommended that the proposed new building includes the existing Gartcosh
Primary School, a new LCSC and Early Learning & Childcare provision. 
The current site has no associated LCSC or nursery class within the current campus. 
2. CONSULTATION REQUIREMENTS 
2.1 In terms of the Schools (Consultation) (Scotland) Act 2010, the Education Authority is
required to publish details of, and consult on any proposal to establish a new school
and on any proposal to establish, terminate or otherwise alter the catchment area of a
school. 
2.2 North Lanarkshire Council will not make any decision, or put any changes into effect,
until the consultation period has been concluded in line with statutory requirements. 
2.3 The consultation period will be a minimum of 57 days, which include 30 school days.  It
begins on 1 March 2023 and finishes on 27 April 2023. 
2.4 The consultation will involve pupils, parent/carers, Parent Councils and staff of the
schools involved, as well as other associated stakeholder and statutory consultees. 
2.5       A public meeting will be held on week beginning 6th March 2023. 
2.6       Council officers will be present at the public meeting to discuss the proposal.  There
will be limited time at the meeting to discuss all issues fully. To ensure that all issues
are covered and that those who may be uncomfortable with speaking publicly are
heard, advance notice of specific questions or issues to be raised will be accepted in
writing up to two days in advance of the meeting – see contact details at 2.9. 
2.7 At the end of the consultation process, a report will be prepared for North Lanarkshire
Council detailing all responses received, summaries of their content and a statement
from Education Scotland on the educational aspects of the proposal.  Responses to the
issues raised through the consultation will also be incorporated in the report.  Copies
of the report will be available, prior to consideration by the council, in the affected
Page 70 of 253

Page 71

schools and online.  It is envisaged that the report will be published on 29 June 2023.     
2.8  An online version of the document and other items related to the consultation can be 
found online at www.northlanarkshire.gov.uk/gartcosh-consultation 
2.9  Further information on the proposal can be obtained by sending an email to 
gartcoshconsultation@northlan.gov.uk 
2.10  All interested parties are invited to submit their comments on or before 27 April 2023. 
3.         PROPOSAL 
3.1     The proposal in this document is to build a new facility incorporating a new build
Gartcosh Primary School in addition to a Language & Communication Support Centre
(LCSC) and an Early Learning and Childcare (ELC) provision within the existing
catchment area. There are two main reasons for this proposal: 
• The pupils currently at Gartcosh Primary School and the new LCSC and new
Nursery Class will benefit educationally by attending new build schools which can
offer a wider range of educational opportunities (see Educational and Community
Benefits sections below). 
• The current Gartcosh Primary School needs replacement due to the levels of
housebuilding in the area.  The new school will be fully accessible and equipped
with modern technology to ensure the best learning opportunities are afforded to
every child. 
3.2 It is proposed that the school will be sited on an area of land between on the current
open space and football pitch located between Woodneuk Avenue and Johnstone
Road. 
3.3 If, following this statutory consultation, the Council proceeds with the proposed school,
then the statutory planning process will be followed as required until completion of the
new school. Prior to that, Gartcosh Primary will continue to operate on its current site. 
4.      EDUCATION BENEFITS STATEMENT 
4.1 Through the planned proposals it is expected that several education benefits will be
achieved on behalf of children and young people including: 
• Improved access to high quality facilities
• Improved access to a greater variety of different education experience
• Access to outdoor learning experiences
• Strengthened practice in pedagogy and learning and teaching 
• Increased opportunities for professional learning and sharing good practice 
4.2    Experience in new school buildings has demonstrated that a new and flexible learning
environment inspires staff and pupils and has a positive impact on the general health
and wellbeing of stakeholders.  
4.3  Improved high quality facilities for learning will be designated in such a way as to allow
a range of teaching styles and approaches, including active learning, interdisciplinary
learning and outdoor learning. 
Page 71 of 253

Page 72

4.4 The curriculum will provide the opportunity for learners to achieve across all curricular
areas and to develop skills, attributes and capabilities aligned with the design principles
of Curriculum for Excellence: challenge and enjoyment, breadth, progression, depth,
personalisation and choice, coherence and relevance. 
4.5   Children and young people will be provided with a broad range of opportunities
for personal achievement and interdisciplinary learning across all curricular areas
by building on best practice in curriculum design in North Lanarkshire Schools. 
4.6 The provision of high-quality technology for learning will provide the potential
to transform ways of learning and teaching by giving young people and staff flexible and
embedded access to a fully digital learning environment. 
4.7 The shared flexible learning and teaching spaces in the new joint campus school will
enable staff to work together in a collaborative manner and provide more opportunities
for co-operative working between pupils. 
4.8 The new school will be fully accessible to disabled learners as required by the Equality
Act (2010). This will be ensured through the delivery of the Council’s:- 
• Equality outcomes 
• Promoting Inclusive Design Protocol and 
• Partnership with North Lanarkshire Disability Access Panel. 
4.9 The new school will be designed in such a way as to promote accessible, inclusive
learning which will meet the needs of all learners including those with Additional
Support Needs. 
4.10 The new school will build on current, and facilitate new, opportunities for effective
integrated working with other services and partner agencies and will provide necessary
support to children and families in the new school catchment area. 
4.11 The new school’s design, construction and operation will be environmentally and
energy efficient; contributing directly to delivering the year-on-year reductions in
greenhouse gas emissions introduced by the Climate Change (Scotland) Act 2009 and
provide a rich context for learning for children and young people about sustainability
now and in the future. 
4.12 The inclusion of LCSC and Early years and Childcare provision in the new build
proposal will provide a fully up-to-date setting for LCSC and Early Years provision in
the Gartcosh area. 
5.      COMMUNITY BENEFITS STATEMENT 
5.1 The current council education estate framework has delivered added value through: 
• Several apprenticeships have been created on the construction of the new
schools.
• Local employment opportunities.
• Meaningful learning and engagement between the framework partners and
the project schools.
• Over 70% of the total investment is being procured through local supply chains. 
Page 72 of 253

Page 73

5.2 In order to maximise the level of local community benefit regular meetings take place
with framework contractors and the council’s Estate Teams. As we move forward at the
pre-qualification stage contractors appointed to the framework and their supply chains
will be required to actively participate in the achievement of social, environmental and
sustainability policy objectives relating to local regeneration, social and economic
growth, recruitment and training along with local supply chain initiatives. In addition,
sustainability will be a key objective on the construction of the new schools thereby
contributing to the Councils target of reducing our carbon footprint. 
5.3 As well as the educational benefits allocated to the specific school projects there will be
wider educational benefits to the North Lanarkshire Community in that, with the
significant level of savings required to be made over the next few financial years, the
best value argument is that we would be utilising resources more efficiently and
effectively. This is in line with 2003 Best Value Legislation and also the demands of the
Education Scotland Act 1980. 
6. IMPLICATIONS OF THE PROPOSALS 
6.1 Rolls and Capacities 
The projected rolls exclude placing requests but include house building estimates. 
Table 3: Projected rolls and capacities for Gartcosh Primary School 2023 - 2028 
School Capacity Roll 2023 Roll 2024 Roll 2025  
Roll % Roll % Roll %
Permanent 188 235 125 308 164 351 187
Temporary 62       
The projected rolls exclude placing requests but include house building estimates. 
6.2 Transport to School 
Council Policy currently provides free transport to those pupils living more than one mile
from their zoned Primary School or where an appropriate walking route is not available.
Education & Families will arrange for an assessment of the walking routes to the site of
a new school and appropriate road crossing patrols will be established if considered
necessary. 
6.3 Staffing 
The proposal should not have significant implications for staffing, either teaching or non-
teaching. Any matter which arises will be dealt with within the terms of local and national
agreements. 
6.4 Secondary Education 
The current zoning arrangement for secondary education is that pupils attending
Gartcosh Primary School attend Chryston High School. No change to the primary to
secondary transfer arrangements will be required as a result of this proposal. Parents
who wish their children to attend an alternative secondary school will require to submit a
placing request for their preferred school. 
Page 73 of 253

Page 74

6.5 Class Sizes 
Class structures are decided by the head teacher in accordance with authority guidelines
and take account of a range of factors, including teacher deployment, school policies,
the available accommodation and pupil numbers at each stage. 
6.6 Future use of the existing school buildings 
Education & Families will declare the existing school buildings surplus to its requirements
should the proposal be approved. Thereafter, the council's Property Services will make
recommendations on its future use or disposal in line with council policy. 
6.7 Financial implications 
Based on previous experience of new build projects within North Lanarkshire, it is
anticipated this proposal will have a limited impact on school revenue budgets. 
6.8 Placing Requests 
It is anticipated that there will be no impact on pupils attending either school on a placing
request. The following options exist for pupils in this position. Firstly, they can transfer
to the new school. Secondly, they can enrol in their designated catchment area school
or thirdly, submit a placing request to another School. The parents of these pupils will
be given the opportunity to discuss their preference with Education & Families staff.
Parents remain responsible for transport costs where an existing placing request to the
new build school is continued. 
7.      EQUALITY IMPACT ASSESSMENT 
An Equality Impact Assessment has been completed and will underpin planning for these
proposals, since a number of the young people involved are considered as being from a
protected group, due to disability.   
8.      INACCURACIES OR OMISSIONS 
8.1 There is a statutory requirement for the Council to consider any allegation of an
inaccuracy or omission in the proposal paper and determine whether the allegation has
foundation.  Where inaccuracies or omissions are notified to, or discovered by, the
Council within this proposal document, the Council will determine if relevant information
has, in its opinion been omitted or whether there is in fact an inaccuracy. 
Notifiers of any omissions or inaccuracies will be informed of the Council’s decision and
the reasons for that decision.  Notifiers will also be informed of any action.  The Council
will invite the notifiers to make further representations to the Council should they disagree
with the Council’s determination or its decision as to whether to take action. 
8.2  If the Council has found, either itself or through a concern being raised, that there is an
inaccuracy or omission in the proposal paper, it must  decide  whether  this relates to a
material consideration relevant to the proposal. 
Where the confirmed inaccuracy or omission relates to a material consideration, there is
a duty on the Council to correct it. 
8.3 Appropriate action will then be taken by the Council depending on whether the
inaccuracy or omission relates to a material consideration. 
Page 74 of 253

Page 75

Such action may include withdrawing the proposal and issuing a revised proposal
paper for the whole consultation period, or issuing a corrected proposal paper with, if,
an extension of the consultation period.  In any of these eventualities, all relevant
consultees (and, where applicable, the notifier(s) of any omissions or inaccuracies) and
HMIE (Education Scotland) will be advised of the action. 
Where inaccuracies or omissions are discovered within the proposal document, the
Council will determine whether relevant information has been omitted or if there has
been an inaccuracy.   action will then be taken by the Council, which may include
issuing corrections, issuing a corrected proposal document, or an extension of the
consultation period.  In any of these eventualities, all relevant consultees (and where
applicable, the notifiers(s) of any action) will be advised. 
8.4  Notifiers of any omissions or inaccuracies will also be given the opportunity to make
representations if they disagree with the Council’s determination of any action on the
matter, which may result in the Council making a further determination/decision on the
matter. 
9.        THE STATUTORY CONSULTATION PROCESS – ADDITIONAL INFORMATION  
9.1 The current requirements for consulting are set out in the Schools (Consultation)
(Scotland) Act 2010.  This consultation will be carried out in accordance with the Act. 
9.2 This consultation has been planned in order to meet the statutory requirements.  
9.3 The consultation document sets out the details of the proposal. 
• The proposal paper details the educational benefits of the proposal and other
relevant information. 
• The proposal paper will be published and widely advertised. 
• North Lanarkshire Council will seek to determine whether there are inaccuracies or
omissions within the proposal paper and take such action as it considers
necessary. 
• The consultation period will be a period of at least 6 weeks including at least 30
school days. 
9.4  Prior to the commencement of the consultation period, the authority will give notice of
the proposal to the relevant consultees.  The relevant consultees are defined in the
Schools (Consultation) (Scotland) Act 2010, and are as follows: 
(a) The parent council or combined parent council of any affected school
(b) The parents of the pupils at any affected school 
(c) The parents of any children expected by the education authority to attend the  
affected school within two years of the date of publication of the proposed paper  
(d)  The pupils at any affected school (in so far as the education authority considers
them to be of suitable age and maturity) 
(e) The staff (teaching and other) at any of the affected school(s) 
(f)   Any trade union which appears to the education authority to be representative
of the persons mentioned above 
(g) The community council (if any) 
Page 75 of 253

Page 76

(h)  The community planning partnership (within the meaning of section 4(5) of the
Community Empowerments (Scotland) Act 2015 for the area of the local
authority in which any affected school is situated 
(i)  Any other community planning partnership that the education authority
considers relevant 
(j)  Any other education authority that the education authority considers relevant 
(k) Any other users of any affected school that the education authority considers
relevant. 
9.5 During the consultation period, the authority will hold and be represented at public
meetings on the relevant proposal. 
9.6 The council will involve Education Scotland in the consultation process.  This will
culminate in Education Scotland preparing and submitting an independent report on
the educational aspects of the proposal.  
9.7 Following the consultation period, the council will prepare and publish a consultation
report.  The report will be published at least three weeks before a  final decision is
taken on the proposal. 
9.8 The consultation timeline provides further information on the timescales for various
staged in the statutory process. 
Please click on the link below to share your views on the proposal (Ctrl + Click to follow
link) 
www.northlanarkshire.gov.uk/Gartcosh-consultation 
Page 76 of 253

Page 77

Appendix 2   
Indicative Timeline for Reconfiguring Intensive ASN Systems and Services 
Stages   Timeline   Date  
1. Committee Date     Tuesday 28 February 2023  
2. Consultation Starts
Phase 1  
Minimum of 6 weeks
To include 30 calendar
days  
Wednesday 1 March 2023  
3. Public Meeting   Mid way through
consultation      
4. Consultation Ends   30 Days   Tuesday 11 April 2023  
5. Report to Education
Scotland Phase2  
3 weeks   Tuesday 2 May 2023 
6. Education Scotland produce
report  
3 weeks   Tuesday 23 May 2023 
7. Consultation report
published Phase 3  
No specified timescale      
8. Time for further
consideration  
3 weeks from publication
date      
9. Final Committee Decision     September 2023  
10. Implement proposal if   
approved by Committee  
3 weeks   
Page 77 of 253

Page 78

Page 78 of 253

Page 79

Appendix 3 
Page 79 of 253

Page 80

Page 80 of 253

Page 81

North Lanarkshire Council
Report
Education, Children and Families Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref   GMcL/MD Date 28/02/23 
Proposals for statutory public consultation on the proposed relocation
of Mavisbank School to the existing Carnbroe Primary 
From  Gerard McLaughlin, Chief Officer (Education - North)  
E-mail mclaughling@northlan.gov.uk Telephone  01236 812 221 
Background 
1.1 Schools (Consultation) (Scotland) Act 2010 
Executive Summary
This report outlines proposals for statutory public consultations on the proposed relocation of
Mavisbank School to ‘existing’ Carnbroe Primary within North Lanarkshire. 
If approved, a statutory consultation will take place involving all statutory consultees, other
stakeholders and interested parties. 
The key reason for this proposal is: 
• To build upon the councils strategic approach regarding the reconfiguration of the intensive
ASN systems and services to support children and young people with intensive social and
emotional needs. 
Revision of ASN provision is a key programme of work within the revised Plan for North Lanarkshire
(March 2020). 
Recommendations 
The Education and Families Committee is recommended to: 
(1) Endorse the contents of the report;
(2) Agree that a formal consultation take place on the proposed change of location for
Mavisbank Primary;
(3) Agree the timeline for consultation outlined in appendix 2 of this report. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (22) Facilitate a North Lanarkshire wide approach to asset
rationalisation, including with communities and partners    
AGENDA ITEM 7
Page 81 of 253

Page 82

The provisions of the above Act place a statutory duty on education authorities to carry out
formal consultations on new build proposals for schools when the proposal is to build the
school out with its current curtilage or when a joint campus is proposed involving a non-
denominational and a denominational primary school. 
1.2 The Act requires education authorities prepare an educational benefits statement, to prepare
(and publish) a proposal paper in respect of any proposal which falls within the terms of the
Act, give notice of the proposal to the relevant consultees (and invite representations) in
accordance with the Act, to hold (and give notice of) a public meeting, involve Education
Scotland. 
1.3 Following the period of consultation, the education authority must review the proposal in
accordance with the Act and prepare (and publish) a consultation report in accordance with
relevant sections of the Act. 
1.4 After publication of the education authority report, HMIE publish a report on the consultation
taking account of the previously published education authority report before a final decision is
made by the Council. 
1.5 The Service will undertake a statutory consultation on the proposed relocation of Mavisbank
School (Secondary) to the existing Carnbroe Primary site. Appendix 1. 
1.6 In September 2019, the Education and Families Committee approved a review of Additional
Support Needs services which established twelve key recommendations for action. Two key
recommendations are cited here, which underpin the intentions of the strategic
recommendations in this paper. 
Recommendation 8: ‘Partnership working will be strengthened in a revised Support Around
the School model, which will enable greater empowerment of staff to meet the needs of young
people and enable a greater connection between needs and the partnership response to them.
A more holistic approach to supporting families will underpin this.’ 
Recommendation 11: ‘A clear plan for the future of the ASN estate, which creates Cluster ASN
Hubs and specialist provision around the envisaged campus model of the future will be
established as part of the Community Investment Fund and developed as part of the ongoing
work to prioritise community hub investment proposals.’ 
1.7 Proposals outlined in this paper have been developed by Education and Families inclusion
team and Procurement and Corporate Finance. Key considerations derived from these
meetings have been incorporated into the models proposed, which include: 
• Quality and condition of the fabric of school buildings
• Possible savings/costs associated with estate re-purposing and school relocation
• Impact assessment and improvement planning for the ASN sector.   
1.8 The Service has adopted a formal project management governance structure to      lead and
monitor the delivery of the overarching ASN strategy which will encompass the achievement
the programme and the savings. 
1.9 In addition, the Service is committed to cost reductions relating to the repatriation of children
to North Lanarkshire Council, both from educational day placements and joint education and
social work residential placements as part of the Closer to Home agenda. The development
of more appropriate local ASN educational provision will support the achievement of this
ambition. 
1.10 The final decision of the education authority is subject to review and possible call in by the
Scottish government which must operate to a strict timeline set out in Appendix 2.  Page 82 of 253

Page 83

1.11 The timeline mentioned above may be subject to review due to unforeseen circumstances. 
2. Report 
2.1. This report establishes the methodology by which the services redesign was envisaged by
officers, in response to the Council’s priorities. A core team of officers in Education and
Families assessed a range of propositions to establish their viability, using a RAG status
approach to highlight most promising options for implementation. 
2.2. A number of factors were used to establish an approach to prioritising potential rationalisation
activities. These are described in the following section. 
2.3. Alignment with the ASN Review: Achievability of Propositions; 
2.3.1 In the ASN Review (2019) there were a number of key recommendations made for officers to
implement. These recommendations set a policy direction for North Lanarkshire Council.
Indeed, Recommendation 11 of the ASN Review supports this approach (Section 1.2).  
2.3.2 A key test of the propositions is related to the extent to which they aided the achievability of
the policy intentions of the ASN Review. 
2.4 Efficient Use of Resources and Affordability of Proposals 
2.4.1 The historic ASN estate provision of North Lanarkshire has meant that there are a number of
smaller, more isolated ASN schools which can be more susceptible to staffing shortages and
therefore less sustainable as a result. Consideration has been given to allowing these smaller
establishments to become incorporated into some of the more modern campus facilities which
have been established, and in which there is capacity for them to be relocated. This will release
a possible net saving to the council in relation to capital receipts from the vacated facilities. 
2.5       Location, Suitability and Condition of Buildings; and Value for Money 
2.5.1 In each case the condition and suitability of the buildings was considered. This was particularly
true in relation to our ASN estate, which requires significant investment, this may take some
years to fully realise through the actions being brought forward through the Community
Investment Fund. Risks of community impact, travel and school location status have been
identified for all proposals, as well as local knowledge where appropriate. 
2.6 Educational Benefits Statement 
2.6.1 Through the planned proposals it is expected that a number of educational benefits will be
achieved on behalf of children and young people with the requirement for intensive services
to meet their additional support needs. These points were clearly established in the findings
of the ASN Review and include: 
• Improved access to an enhanced outdoor environment which will support a range of vocational
and outdoor learning opportunities for the secondary pupils at Mavisbank.
• Enhanced, innovative, opportunities for vocational and life skills work within the school
building.
• Greater scope for multi-agency and family engagement work within the school building,
including health professionals.
• Wider access to sensory and therapeutic spaces within the school building
• Carefully planned and designed use of technology will support learners with significant support
needs. 
2.6.2 This proposal will provide opportunities for children and young people to learn and work within,
between and beyond a range of establishments and services. It will facilitate increased
collaboration to make more effective use of existing expertise in a new environment.  Page 83 of 253

Page 84

2.6.3 A key feature of this work will be Inclusion and Equity and officers will work in close partnership
with the Virtual School Lead, Digital School Lead and Equity and Improvement Lead Officers.
2.6.4 Education provision within the proposed Carnbroe campus will also continue to be linked with
this portfolio, enhancing the ability to provide tailored support to those young people
experiencing a range of adversities who may benefit from an alternative setting.   
2.6.5 It should be noted that there is already existing work progressing to establish ASN senior
phase provision as part of the campus plan for young people in Cumbernauld Theatre and
Cinema complex on the Cumbernauld Academy site. This is to involve Redburn and Glencryan
jointly in a venture under the working title of Glenburn College. This is separate to the planning
for the proposed Carnbroe campus at this stage but will be linked as the projects progress. 
2.6.6 It is also expected that there can be a rationalisation of assets in this work, with a focus on
building around the existing Carnbroe site to develop outdoor spaces and strengthening
vocational provision and bespoke programmes within existing school (and future town and
community) campuses. 
2.6.7 All of the elements of the relocation will benefit from the integrated approach to service and
support planning which underlies the wider new operating model within Education and
Families, ensuring support is delivered holistically in partnership with children, young people
and their families.  To support this, we will also seek to maximise opportunities for involvement
in service and support planning (in line with the Voice strand of The Promise). 
2.7 Relocation of Existing Establishments within Alternative/Higher Quality Facilities 
2.7.1 In line with the policy established in the Plan for North Lanarkshire to ensure that young people
are catered for within high-quality facilities, it is also proposed that consultation takes place to
strengthen the provision experienced by pupils in Mavisbank School. Each of these
propositions is outlined in what follows. 
2.8 Project Planning 
2.8.1 The work relating to this area will be overseen by a Programme Board, in accordance with
North Lanarkshire’s Project Management protocols, for the Reconfiguration of Intensive ASN
Systems and Services. This is serviced by a Senior Responsible Officer (SRO) and a
Responsible Officer (RO) and a project team, which will ensure all aspects of the programme
plan, including the statutory consultation, are accomplished successfully and timeously, in
relation to the planned critical path for developments.  
3. Measures of success 
3.1 Stakeholder support for the options brought forward. 
3.2 Successful implementation of planned proposals. 
3.3 Achievement of budget savings target in line with approved budget savings agreed by Council
March 2020 
3.4 Improved quality of service and provision to effectively meet the needs of children, young
people and families   
4. Supporting documentation 
4.1       Appendix 1 Statutory Consultation Mavisbank School Page 84 of 253

Page 85

4.2       Appendix 2     Statutory Consultation Timeline
4.3 Appendix 3    ASN Review – link to report
https://mars.northlanarkshire.gov.uk/egenda/images/att92041.pdf 
Gerard McLaughlin
Chief Officer (Education - North) 
5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
An Equality Impact Assessment has been completed and will underpin planning for
these proposals, since a number of the young people involved are considered as
being from a protected group, due to disability. 
Page 85 of 253

Page 86

If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
At this stage there is no financial impact linked to this consultation. 
The Service is currently assessing the value of this capital investment with support
from colleagues in Asset and Procurement Solutions. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Affected staff will be managed in accordance with the appropriate Workforce
Change Policies and in with the signatory trades unions.  Considerations would
include Compulsory Transfer, Premature/Early Retirement,
Redundancy/Redeployment.
The Service would be required to follow the requirements for consulting as set out
in the Schools (Consultation) (Scotland) Act 2010. Further stakeholder, community
and parental consultation would be required in the event that the Service proceeds
with any of the recommendations. An indicative timeline for the consultation
process is outlined in Appendix 1.
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☒
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 86 of 253

Page 87

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐  
The carbon footprint will reduce if the numbers of establishments operating was
reduced and pupils were catered for in our newer and more energy efficient
campuses.
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
A Programme Board has been established for the Implementation of the ASN
Review.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Appendix 1 
Statutory Consultation 
Proposal to relocate Mavisbank School to 
the existing Carnbroe Primary School  Page 87 of 253

Page 88

EDUCATION AND FAMILIES 
Page 88 of 253

Page 89

NORTH LANARKSHIRE COUNCIL: EDUCATION & FAMILIES 
Proposal to relocate Mavisbank School to the existing Carnbroe Primary School 
1  INTRODUCTION
Mavisbank School is located at Mitchell Street in Airdrie and caters for secondary pupils from
across the central area of North Lanarkshire.  Pupils have complex additional support and
significant medical needs.  The school capacity is 24 with a current roll of 22 pupils. 
It is recommended that Mavisbank School pupils are relocated to the existing Carnbroe
Primary School that will facilitate and enhance provision for pupils with complex needs within
the Central locality. Carnbroe Primary School is located at Kirkton Crescent in Coatbridge.   
Within the overarching planning for Education and Families, there is a focus on providing
universal, additional and intensive services, with the universal provided by schools, the
additional supported by the Integrated Cluster Wellbeing Teams and Bases. Intensive level
support is normally delivered through ASN schools with appropriate support from social work
or other services as part of an integrated child’s plan. This latter category is also supported by
additional services. It is the intensive elements that this paper focuses on.   
2       CONSULTATION REQUIREMENTS 
2.1 In terms of the Schools (Consultation) (Scotland) Act 2010, the Education Authority is 
required to publish details of, and consult on any proposal to establish a new school and
on any proposal to establish, terminate or otherwise alter the catchment area of a school. 
2.2 North Lanarkshire Council will not make any decision, or put any changes into effect,
until the consultation period has been concluded in line with statutory requirements. 
2.3 The consultation period will be a minimum of 57 days, which include 30 school days.  It
begins on 1 March 2023 and finishes on 27 April 2023. 
2.4 The consultation will involve pupils, parent/carers, Parent Councils and staff of the
schools involved, as well as other associated stakeholder and statutory consultees. 
2.5  A public meeting will be held on week beginning 6th March 2023. 
2.6  Council officers will be present at the public meeting to discuss the proposal.  There will
be limited time at the meeting to discuss all issues fully. To ensure that all issues are
covered and that those who may be uncomfortable with speaking publicly are heard,
advance notice of specific questions or issues to be raised will be accepted in writing up
to two days in advance of the meeting – see contact details at 2.9. 
2.7 At the end of the consultation process, a report will be prepared for North Lanarkshire
Council detailing all responses received, summaries of their content and a statement
from Education Scotland on the educational aspects of the proposal.  Responses to the
issues raised through the consultation will also be incorporated in the report.  Copies of
the report will be available, prior to consideration by the council, in the affected schools
and online.  It is envisaged that the report will be published on 29 June 2023.     
2.8 An online version of the document and other items related to the consultation can be
found online at www.northlanarkshire.gov.uk/mavisbank-consultation 
Page 89 of 253

Page 90

2.9  Further information on the proposal can be obtained by sending an email to 
mavisbankconsultation@northlan.gov.uk 
2.10  All interested parties are invited to submit their comments on or before 27 April 2023. 
3.      PROPOSAL  
3.1    The proposal is that Mavisbank pupils relocate to the existing Carnbroe Primary School.           
The reasons for this proposal are: 
• To ensure that there is highly appropriate provision for young people with significant
additional support needs within this area of North Lanarkshire. 
• To facilitate a wide range of vocational and outdoor learning activities for young
people with significant addition support needs. 
• To create real-life, work-related opportunities to support young people in their
pathway to potential future employment. 
• To enable the on-going repatriation of North Lanarkshire’s young people who are
currently in out of authority placements.    
4.       EDUCATION BENEFITS STATEMENT 
4.1 Through the planned proposals it is expected that several educational benefits will be
achieved on behalf of children and young people with the requirement for intensive
services to meet their additional support needs: 
• Improved access to an enhanced outdoor environment which will support a range
of vocational and outdoor learning opportunities for the secondary pupils at
Mavisbank.
• Enhanced, innovative, opportunities for vocational and life skills work within the
school building.
• Greater scope for multi-agency and family engagement work within the school
building, including health professionals.
• Wider access to sensory and therapeutic spaces within the school building
• Carefully planned and designed use of technology will support learners with
significant support needs. 
5.   COMMUNITY IMPACT    
5.1 Mavisbank School is not being considered for closure or service cessation.    
5.2 Work will now be done between Education and Families and Enterprise
and Communities to:  
• Assess the impact on community use 
• Assess the budget implications income streams 
• Engage effectively/co-producing the approach with communities/users 
• Sight the CLNL Board on the proposals and impact as required. 
Page 90 of 253

Page 91

6. IMPLICATIONS OF THE PROPOSAL 
6.1 Transitions    
It is recognised that the change of location for some Mavisbank pupils may be
challenging, and consideration has been given to how best to support pupils to make
the transition as seamless as possible.  Staff will work collaboratively with parents and
pupils to support pupils in preparing for the transition to the new learning spaces within
Carnbroe Primary School. Each pupil will be offered individualised support, as required,
to ensure they are completely comfortable to complete the transition. This may involve
visits during and after school.   
6.2 Transport 
Pupils will continue to be transported from home to school.  Transport contracts will be
updated to reflect the different drop off and pick up point. As a result, there is no
anticipated negative impact on pupils in relation to transport. 
6.3  Financial Implications 
At this stage there is no financial impact linked to this consultation.   
6.4 HR Implications   
Affected staff will be managed in accordance with the appropriate Workforce Change
Policies of the Council, and in consultation with the signatory trades unions.
Considerations would include Compulsory Transfer, Premature/Early Retirement,
Redundancy/ Redeployment.    
7.        EQUALITY IMPACT ASSESSMENT 
An Equality Impact Assessment has been completed and will underpin planning for
these proposals, since a number of the young people involved are considered as being
from a protected group, due to disability.    
8.        INACCURACIES OR OMISSIONS 
8.1 There is a statutory requirement for the Council to consider any allegation of an
inaccuracy or omission in the proposal paper and determine whether the allegation has
foundation.  Where inaccuracies or omissions are notified to, or discovered by, the
Council within this proposal document, the Council will determine if relevant information
has, in its opinion been omitted or whether there is in fact an inaccuracy. 
Notifiers of any omissions or inaccuracies will be informed of the Council’s decision and
the reasons for that decision.  Notifiers will also be informed of any action.  The Council
will invite the notifiers to make further representations to the Council should they
disagree with the Council’s determination or its decision as to whether to take action. 
8.2 If the Council has found, either itself or through a concern being raised, that there is an
inaccuracy or omission in the proposal paper, it must decide whether this relates to a
material consideration relevant to the proposal. 
Where the confirmed inaccuracy or omission relates to a material consideration, there
is a duty on the Council to correct it. 
Page 91 of 253

Page 92

8.3 Appropriate action will then be taken by the Council depending on whether the
inaccuracy or omission relates to a material consideration. 
Such action may include withdrawing the proposal and issuing a revised proposal paper
for the whole consultation period, or issuing a corrected proposal paper with, if, an
extension of the consultation period.  In any of these eventualities, all relevant
consultees (and, where applicable, the notifier(s) of any omissions or inaccuracies) and
HMIE (Education Scotland) will be advised of the action. 
Where inaccuracies or omissions are discovered within the proposal document, the
Council will determine whether relevant information has been omitted or if there has
been an inaccuracy.   action will then be taken by the Council, which may include
issuing corrections, issuing a corrected proposal document, or an extension of the
consultation period.  In any of these eventualities, all relevant consultees (and where
applicable, the notifiers(s) of any action) will be advised. 
8.4  Notifiers of any omissions or inaccuracies will also be given the opportunity to make
representations if they disagree with the Council’s determination of any action on the
matter, which may result in the Council making a further determination/decision on the
matter. 
9.        THE STATUTORY CONSULTATION PROCESS – ADDITIONAL INFORMATION  
9.1 The current requirements for consulting are set out in the Schools (Consultation)
(Scotland) Act 2010.  This consultation will be carried out in accordance with the Act. 
9.2 This consultation has been planned in order to meet the following statutory
requirements:  
9.2.1 The consultation document sets out the details of the proposal. 
• The proposal paper details the educational benefits of the proposal and other
relevant information. 
• The proposal paper will be published and widely advertised. 
• North Lanarkshire Council will seek to determine whether there are inaccuracies or
omissions within the proposal paper and take such action as it considers
necessary. 
• The consultation period will be a period of at least 6 weeks including at least 30
school days. 
9.3  Prior to the commencement of the consultation period, the authority will give notice of
the proposal to the relevant consultees.  The relevant consultees are defined in the
Schools (Consultation) (Scotland) Act 2010, and are as follows: 
(a)  The parent council or combined parent council of any affected school
(b)  The parents of the pupils at any affected school 
(c)  The parents of any children expected by the education authority to attend the
affected school within two years of the date of publication of the proposed
paper 
(d)  The pupils at any affected school (in so far as the education authority considers
them to be of suitable age and maturity) 
(e) The staff (teaching and other) at any of the affected school(s) 
Page 92 of 253

Page 93

(f)   Any trade union which appears to the education authority to be representative
of the persons mentioned above 
(g) The community council (if any) 
(h)  The community planning partnership (within the meaning of section 4(5) of the
Community Empowerments (Scotland) Act 2015 for the area of the local
authority in which any affected school is situated 
(i)   Any other community planning partnership that the education authority
considers relevant 
(j)  Any other education authority that the education authority considers relevant 
(k)  Any other users of any affected school that the education authority considers
relevant. 
9.4 During the consultation period, the authority will hold and be represented at public
meetings on the relevant proposal. 
9.5 The council will involve Education Scotland in the consultation process.  This will
culminate in Education Scotland preparing and submitting an independent report on
the educational aspects of the proposal.  
9.6 Following the consultation period, the council will prepare and publish a consultation
report.  The report will be published at least three weeks before a  final decision is
taken on the proposal. 
9.7 The consultation timeline provides further information on the timescales for various
staged in the statutory process. 
Please click on the link below to share your views on the proposal (Ctrl + Click to follow
link) 
www.northlanarkshire.gov.uk/mavisbankschool-consultation 
Page 93 of 253

Page 94

Appendix 2   
Indicative Timeline for Reconfiguring Intensive ASN Systems and Services 
Stages   Timeline   Date  
1. Committee Date     Tuesday 28 February 2023  
2. Consultation Starts
Phase 1  
Minimum of 6 weeks
To include 30 calendar
days  
Wednesday 1 March 2023  
3. Public Meeting   Mid way through
consultation      
4. Consultation Ends   30 Days   Tuesday 11 April 2023  
5. Report to Education
Scotland Phase2  
3 weeks   Tuesday 2 May 2023 
6. Education Scotland
produce report  
3 weeks   Tuesday 23 May 2023 
7. Consultation report
published Phase 3  
No specified timescale      
8. Time for further
consideration  
3 weeks from publication
date      
9. Final Committee Decision     September 2023  
10. Implement proposal if   
approved by Committee  
3 weeks   
Page 94 of 253

Page 95

Page 95 of 253

Page 96

Page 96 of 253

Page 97

North Lanarkshire Council
Report
Education, Children and Families Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref   GMcL/MD Date 28/02/23 
Proposals for statutory public consultation on the proposed
rezoning of the Dunlop Estate. 
From  Gerard McLaughlin, Chief Officer (Education - North)  
E-mail mclaughling@northlan.gov.uk Telephone  01236 812 221 
Executive Summary
This report outlines proposals for statutory public consultations on the proposed rezoning
of the Dunlop estate within North Lanarkshire. 
If approved, a statutory consultation will take place involving all statutory consultees, other
stakeholders and interested parties. 
The key reason for this proposal is: 
• In November 2018, following a request from residents, the Local Government
Boundary Commission for Scotland agreed to conduct a review of the boundary
between Glasgow City and North Lanarkshire council areas at Cardowan, Stepps  
Recommendations
It is recommended that the Education, Children and Families Committee: 
(1) Endorse the contents of the report;
(2) Agree that a formal consultation take place on the re-zoning of Dunlop Estate,
Stepps;
(3) Agree the timeline for consultation outlined in appendix 1 of this report.  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (22) Facilitate a North Lanarkshire wide approach to asset
rationalisation, including with communities and partners
AGENDA ITEM 8
Page 97 of 253

Page 98

1 Background 
1.1 In terms of the Schools (Consultation) (Scotland) Act 2010, the Education Authority is
required to publish details of, and consult on any proposal to establish a new school
and on any proposal to establish, terminate or otherwise alter the catchment area of a
school. 
1.2 The Act requires education authorities prepare an educational benefits statement, to
prepare (and publish) a proposal paper in respect of any proposal which falls within the
terms of the Act, give notice of the proposal to the relevant consultees (and invite
representations) in accordance with the Act, to hold (and give notice of) a public
meeting, involve Education Scotland. 
1.3 Following the period of consultation, the education authority must review the proposal
in accordance with the Act and prepare (and publish) a consultation report in
accordance with relevant sections of the Act. 
1.4 After publication of the education authority report, HMIE publish a report on the
consultation taking account of the previously published education authority report
before a final decision is made by the Council. 
1.5  The Council will undertake a formal consultation on the Dunlop Estate that lies to the
east of Dewar Road and includes properties on Dunlop Close, Dunlop Court, Dunlop
Crescent, Dunlop Gate, Dunlop Gardens, Dunlop Grove and Dunlop Wynd.  In 2018,
Scottish Ministers gave effect to the proposals that this area is transferred from
Glasgow City Council area to North Lanarkshire Council area coming into force from
01 April 2019.  The local community has since made representation to have this area
rezoned to North Lanarkshire. 
1.6 The Service has adopted a formal project management governance structure to lead
and monitor the delivery of the overarching ASN strategy which will encompass the
achievement the programme and the savings.
Page 98 of 253

Page 99

1.7 As part of the budget setting process the Service anticipates a targeted saving of
£0.150m linked to mergers and re-zonings of schools. 
1.8 The final decision of the education authority is subject to review and possible call in by
the Scottish government which must operate to a strict timeline set out in Appendix 2. 
1.9 The timeline mentioned above may be subject to review due to unforeseen
circumstances. 
2. Report 
2.1 In November 2018, the Local Government Boundary Commission for Scotland agreed
to conduct a review of the boundary between Glasgow City and North Lanarkshire
council areas at Cardowan, Stepps.  The area concerned lies to the east of Dewar
Road and includes properties on Dunlop Close, Dunlop Court, Dunlop Crescent,
Dunlop Gate, Dunlop Gardens, Dunlop Grove, and Dunlop Wynd.  In 2018, Scottish
Ministers gave effect to the proposals that this area is transferred from Glasgow City
Council and North Lanarkshire Council adopted the area from 01 April 2019. 
2.2 Furthermore, the local community has since made representation to have this area
rezoned to North Lanarkshire to realign the school catchment boundaries to North
Lanarkshire. School catchment areas define which nursery, primary and secondary
school each residential property in North Lanarkshire is aligned to. 
2.3 All geographical areas, including vacant land (where there is no housing) is included
within a catchment boundary to ensure the whole authority is included in the zoning of
the school estate. 
2.4    The proposal will provide opportunities for children and young people to learn and work
within their local community by rezoning the adopted area in line within North
Lanarkshire catchments. 
2.5 The work relating to this area will be overseen by a Programme Board, in accordance
with North Lanarkshire’s Project Management protocols. This is serviced by a Senior
Responsible Officer (SRO) and a Responsible Officer (RO) and a project team, which
will ensure all aspects of the programme plan, including the statutory consultation, are
accomplished successfully and timeously, in relation to the planned critical path for
developments. 
2.6 Having taken account of existing capacity to accommodate and meet the needs of
pupils transferring from the former Glasgow area and future pupil populations, the
intention now is to formally consult on the rezoning of this area into North Lanarkshire
Council. 
3. Measures of success 
3.1 Successful implementation of planned proposals. 
3.2 Increased numbers of children and young people remaining within their local
community.   
Page 99 of 253

Page 100

4. Supporting documentation 
4.1       Appendix 1 Statutory Consultation Rezoning the Dunlop Estate
4.2 Appendix 2    Statutory Consultation Timeline 
Gerard McLaughlin
Chief Officer (Education - North) 
Page 100 of 253

Page 101

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
An Equality Impact Assessment has been completed and will underpin planning for
these proposals, since a number of the young people involved are considered as
being from a protected group, due to disability. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
See Appendix 1
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Service would be required to follow the requirements for consulting as set out
in the Schools (Consultation) (Scotland) Act 2010. Further stakeholder, community
and parental consultation would be required in the event that the Service proceeds
with any of the recommendations. An indicative timeline for the consultation
process is outlined in Appendix 2.
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒
Page 101 of 253

Page 102

If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☒
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐  
The carbon footprint will reduce if the numbers of establishments operating was
reduced and pupils were catered for in our newer and more energy efficient
campuses.
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If schools were selected for re-zoning it would have a significant impact on the
affected pupils / parents / staff. However, the Service has extensive experience of
successfully implementing new school builds, mergers and closures. This includes
management of transition arrangements for pupils, updating transport requirements
and staff/trade union communication and consultation.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 102 of 253

Page 103

Appendix 1 
Statutory Consultation 
Proposal to Rezone the Dunlop Estate Areas that includes
properties on Dunlop Close, Dunlop Court, Dunlop Crescent,
Dunlop Gate, Dunlop Gardens, Dunlop Grove and Dunlop
Wynd into North Lanarkshire Council 
EDUCATION AND FAMILIES 
Page 103 of 253

Page 104

NORTH LANARKSHIRE COUNCIL: EDUCATION AND FAMILIES 
Proposal to Rezone the Dunlop Estate Areas that includes properties on
Dunlop Close, Dunlop Court, Dunlop Crescent, Dunlop Gate, Dunlop Gardens,
Dunlop Grove and Dunlop Wynd into North Lanarkshire Council 
1.    INTRODUCTION 
In November 2018, the Local Government Boundary Commission for Scotland agreed to
conduct a review of the boundary between Glasgow City and North Lanarkshire council
areas at Cardowan, Stepps.  The area concerned lies to the east of Dewar Road and
includes properties on Dunlop Close, Dunlop Court, Dunlop Crescent, Dunlop Gate,
Dunlop Gardens, Dunlop Grove, and Dunlop Wynd.  In 2018, Scottish Ministers gave effect
to the proposals that this area is transferred from Glasgow City Council and North
Lanarkshire Council adopted the area from 01 April 2019. 
Furthermore, the local community has since made representation to have this area rezoned
to North Lanarkshire to realign the school catchment boundaries to North
Lanarkshire. School catchment areas define which nursery, primary and secondary school
each residential property in North Lanarkshire is aligned to. 
All geographical areas, including vacant land (where there is no housing) is included within
a catchment boundary to ensure the whole authority is included in the zoning of the school
estate. 
2.   CONSULTATION REQUIREMENTS 
2.1 In terms of the Schools (Consultation) (Scotland) Act 2010, the Education Authority is
required to publish details of, and consult on any proposal to establish a new school and
on any proposal to establish, terminate or otherwise alter the catchment area of a
school. 
2.2 North Lanarkshire Council will not make any decision, or put any changes into effect,
until the consultation period has been concluded in line with statutory requirements. 
2.3 The consultation period will be a minimum of 57 days, which include 30 school days.  It
begins on 1 March 2023 and finishes on 27 April 2023. 
2.4 The consultation will involve pupils, parent/carers, Parent Councils and staff of the
schools involved, as well as other associated stakeholder and statutory consultees. 
2.5  A public meeting will be held on week beginning 6th March 2023. 
2.6  Council officers will be present at the public meeting to discuss the proposal.  There will    
be limited time at the meeting to discuss all issues fully. To ensure that all issues are
covered and that those who may be uncomfortable with speaking publicly are heard,
advance notice of  specific questions or issues to be raised will be accepted in writing up
to two days in advance of the meeting – see contact details at 2.9. 
2.7 At the end of the consultation process, a report will be prepared for North Lanarkshire
Council detailing all responses received, summaries of their content and a statement
from Education Scotland on the educational aspects of the proposal.  Responses to the
issues raised through the consultation will also be incorporated in the report.  Copies of
Page 104 of 253

Page 105

the report will be available, prior to consideration by the council, in the affected schools
and online.  It is envisaged that the report will be published on 29 June 2023.     
2.8 An online version of the document and other items related to the consultation can be
found online at www.northlanarkshire.gov.uk/dunlopestate-consultation 
2.9  Further information on the proposal can be obtained by sending an email to  
dunlopestateconsultation@northlan.gov.uk 
2.10 All interested parties are invited to submit their comments on or before 27 April 2023. 
3.      PROPOSAL  
3.1 The proposal is to rezone the Dunlop Estate area from Glasgow City Council to North
Lanarkshire Council. 
The reasons for this proposal are: 
• To ensure that pupils in the Dunlop Estate can access school provision in the North
Lanarkshire council catchment area. 
• To promote community integration, as requested by the residents of the estate. 
4.      BENEFITS STATEMENT 
4.1 Pupils who are resident within the delineated zone for a school will be able to attend
their zoned school and be taught with peers from their community. It is anticipated that
this will help pupils integrate within the local community and experience a wider
educational experience through interacting with the local community 
4.2  Families who live in the affected area will have clear information on their zoned primary
school, thereby providing certainty about future zoning arrangements. 
5.   EARLY LEARNING AND CHILDCARE PROVISION    
5.1 The re-zoning of the Dunlop Estate will provide parents and children with access to an
ELC place within North Lanarkshire, alleviating the current requirement for cross
boundary approval from Glasgow City Council.   
6.  IMPLICATIONS OF THE PROPOSAL
6.1 The table below outlines the current details of pupils attending North Lanarkshire
Schools within the new catchment areas from the Dunlop Estate.    
Table 1 - Primary Schools
Primary School 2017 -2018 2018-2019 2019-2020 2020-21 2021-22
Chryston 0 0 0 2 2
St Barbara's 2 4 4 4 2
Total No of Pupils 2 4 4 6 4 
Page 105 of 253

Page 106

Table 2 – Secondary Schools
Secondary School 2021-22 2020-21 2019-2020 2018-2019 2017 -2018
Chryston 11 8 8 0 0
Our Lady's 4 4 2 0 0
Total No of Pupils 15 12 10 0 0 
6.2  Transport to School  
Council Policy currently provides free transport to those pupils living more than one
mile from their zoned Primary School or where an appropriate walking route is not
available. Education & Families will arrange for an assessment of the walking routes to
the site of the catchment schools and appropriate road crossing patrols will be
established if considered necessary. 
6.3  Financial Implication 
Based on current rates, it is estimated that the provision of free school transport 
would cost in the region on £922 per entitled pupil, per school year equating to £6454 
per pupil during the course of their primary education.  This would apply only to 
eligible pupils attending their catchment school and is subject to efficiency through 
existing economies of scale. 
7.        EQUALITY IMPACT ASSESSMENT 
An Equality Impact Assessment has been completed and will underpin planning for
these proposals, since a number of the young people involved are considered as being
from a protected group, due to disability.    
8.        INACCURACIES OR OMISSIONS 
8.1 There is a statutory requirement for the Council to consider any allegation of an
inaccuracy or omission in the proposal paper and determine whether the allegation has
foundation.  Where inaccuracies or omissions are notified to, or discovered by, the
Council within this proposal document, the Council will determine if relevant information
has, in its opinion been omitted or whether there is in fact an inaccuracy. 
Notifiers of any omissions or inaccuracies will be informed of the Council’s decision and
the reasons for that decision.  Notifiers will also be informed of any action.  The Council
will invite the notifiers to make further representations to the Council should they
disagree with the Council’s determination or its decision as to whether to take action. 
8.2 If the Council has found, either itself or through a concern being raised, that there is an
inaccuracy or omission in the proposal paper, it must decide whether this relates to a
material consideration relevant to the proposal. 
Where the confirmed inaccuracy or omission relates to a material consideration, there
is a duty on the Council to correct it. 
8.3 Appropriate action will then be taken by the Council depending on whether the
inaccuracy or omission relates to a material consideration. 
Page 106 of 253

Page 107

Such action may include withdrawing the proposal and issuing a revised proposal
paper for the whole consultation period, or issuing a corrected proposal paper with, if,
an extension of the consultation period.  In any of these eventualities, all relevant
consultees (and, where applicable, the notifier(s) of any omissions or inaccuracies) and
HMIE (Education Scotland) will be advised of the action. 
Where inaccuracies or omissions are discovered within the proposal document, the
Council will determine whether relevant information has been omitted or if there has
been an inaccuracy.   action will then be taken by the Council, which may include
issuing corrections, issuing a corrected proposal document, or an extension of the
consultation period.  In any of these eventualities, all relevant consultees (and where
applicable, the notifiers(s) of any action) will be advised. 
8.4  Notifiers of any omissions or inaccuracies will also be given the opportunity to make
representations if they disagree with the Council’s determination of any action on the
matter, which may result in the Council making a further determination/decision on the
matter. 
9.        THE STATUTORY CONSULTATION PROCESS – ADDITIONAL INFORMATION  
9.1 The current requirements for consulting are set out in the Schools (Consultation)
(Scotland) Act 2010.  This consultation will be carried out in accordance with the Act. 
9.2 This consultation has been planned in order to meet the following statutory
requirements:  
9.2.1 The consultation document sets out the details of the proposal. 
• The proposal paper details the educational benefits of the proposal and other
relevant information. 
• The proposal paper will be published and widely advertised. 
• North Lanarkshire Council will seek to determine whether there are inaccuracies or
omissions within the proposal paper and take such action as it considers
necessary. 
• The consultation period will be a period of at least 6 weeks including at least 30
school days. 
9.3  Prior to the commencement of the consultation period, the authority will give notice of
the proposal to the relevant consultees.  The relevant consultees are defined in the
Schools (Consultation) (Scotland) Act 2010, and are as follows: 
(a) The parent council or combined parent council of any affected school
(b) The parents of the pupils at any affected school 
(c) The parents of any children expected by the education authority to attend the 
affected school within two years of the date of publication of the proposed
paper 
(d) The pupils at any affected school (in so far as the education authority considers
them to be of suitable age and maturity) 
(e) The staff (teaching and other) at any of the affected school(s) 
(f) Any trade union which appears to the education authority to be representative
of the persons mentioned above 
(g) The community council (if any) 
Page 107 of 253

Page 108

(h) The community planning partnership (within the meaning of section 4(5) of the
Community Empowerments (Scotland) Act 2015 for the area of the local
authority in which any affected school is situated 
(i) Any other community planning partnership that the education authority
considers relevant 
(j) Any other education authority that the education authority considers relevant 
(k) Any other users of any affected school that the education authority considers
relevant. 
9.4 During the consultation period, the authority will hold and be represented at public
meetings on the relevant proposal. 
9.5 The council will involve Education Scotland in the consultation process.  This will
culminate in Education Scotland preparing and submitting an independent report on
the educational aspects of the proposal.  
9.6 Following the consultation period, the council will prepare and publish a consultation
report.  The report will be published at least three weeks before a  final decision is
taken on the proposal. 
9.7 The consultation timeline provides further information on the timescales for various
staged in the statutory process. 
Please click on the link below to share your views on the proposal (Ctrl + Click to follow
link) 
dunlopestateconsultation@northlan.gov.uk 
Page 108 of 253

Page 109

Appendix 2   
Indicative Timeline for Reconfiguring Intensive ASN Systems and Services 
Stages   Timeline   Date  
1. Committee Date     Tuesday 28 February 2023  
2. Consultation Starts
Phase 1  
Minimum of 6 weeks
To include 30 calendar
days  
Wednesday 1 March 2023  
3. Public Meeting   Mid way through
consultation      
4. Consultation Ends   30 Days   Tuesday 11 April 2023  
5. Report to Education
Scotland Phase2  
3 weeks   Tuesday 2 May 2023 
6. Education Scotland produce
report  
3 weeks   Tuesday 23 May 2023 
7. Consultation report
published Phase 3  
No specified timescale      
8. Time for further
consideration  
3 weeks from publication
date      
9. Final Committee Decision     September 2023  
10. Implement proposal if   
approved by Committee  
3 weeks   
Page 109 of 253

Page 110

Page 110 of 253

Page 111

North Lanarkshire Council
Report
Education Children and Families Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  AG Date 28/02/23 
Annual Report of the Chief Social Work Officer 2021/22 
From  Alison Gordon, Chief Social Work Officer  
E-mail gordonal@northlan.gov.uk Telephone 01698 332001 
Executive Summary 
The Chief Social Work Officer (CSWO) of each local authority is required to provide an
annual report and a standard template for this purpose is issued by the office of the
Chief Social Work Advisor to the Scottish Government. The North Lanarkshire CSWO
Report 2021/22, which is attached as an appendix to this report, provides information on
the delivery of statutory functions, performance and improvement activity across the
range of social work services over the last year. In addition, information is provided on
the wider governance and planning of social work provision in North Lanarkshire,
including its key role in local partnerships, and on both the national and local challenges
impacting on the delivery of social work services   These challenges include rising
demand and complexity of need, reflecting and overlaid by the lasting impact on our
communities of the Covid 19 pandemic and the subsequent cost of living crisis   The
report also reflects social work’s contribution to the Programme of Work underpinning
the Plan for North Lanarkshire and Delivering for Communities. 
Recommendations 
It is recommended that the Education Children and Families Committee:  
(1) Approve this report 
(2) Note that approval of the report will also be sought through the Adult Care and
Social Work Committee 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
AGENDA ITEM 9
Page 111 of 253

Page 112

1. Background 
1.1 The requirement that each local authority appoint a professionally qualified Chief Social
Work Officer is contained in Section 45 of the Local government (Scotland) Act 1994.
Statutory Guidance on the role of the Chief Social Work Officer was updated in 2016,
in particular to reflect the impact of Health and Social Care integration, extending the
responsibilities of the role to provide advice to the Integration Joint Board (IJB). In
addition to providing advice both to the Local Authority and IJB in relation to the
discharge of statutory social work functions the role continues to carry key
responsibilities for professional leadership, values, and standards both for directly
provided and commissioned services. 
1.2 Within North Lanarkshire social work services are now delivered and governed through
both the Health and Social Care Partnership (Adult Social Work Services) and the
Education and Families Services (Children, Families and Justice Social Work) with the
Chief Social Work Officer’s responsibilities for practice and staff governance covering
social work functions across both areas.   The Chief Social Work Officer role in North
Lanarkshire sits within the Education and Families Service with the operational head of
Children, Families and Justice Social Work. However, whilst the CSWO role requires
to be undertaken by one designated individual, delegation of responsibilities is
permitted where required by the scale of business. In North Lanarkshire this means
that the Chief Officer Adult Social Work Services, routinely exercises delegated
responsibilities for decision-making and professional standards within adult services as
well as providing support and cover with respect to the wider functions of the CSWO
role.   
1.3  As noted above the Annual Chief Social Work Report is intended to provide a key
overview of social work service delivery and uses a core template provided by the
Scottish Government.  The Office of the Chief Social Work Advisor (OCSWA) also
produces a national report each year which draws on key themes and messages from
CSWO reports across Scotland.   
2. Report 
2.1 The report provides an update on the governance and partnership arrangements which
provide a framework for the delivery of social work services in North Lanarkshire.  There
have been limited changes to these within 2021/22 although the incorporation of
additional services within Education and Families and within the remit of the Chief
Social Work Officer has further strengthened opportunities for joint-working and
supported the integration of service delivery and support to individuals and families in
key areas such as tackling poverty, employability and community connection.  Similarly
social work services remain fully engaged with the continued embedding of the
communities structures associated with Delivering for Communities including the
delivery of local outcome and improvement plans (LOIPs) through the Community
Boards.  Continued coherence of planning and delivery across all areas of social work
is supported both by the core council operating model and specific cross-cutting
arrangements within social work such as the social work leadership and workforce
meetings.  This close alignment has been particularly important to ensuring a
responsive and effective approach to some of the challenges experienced during this
period where both the direct the impacts of the pandemic and the related changes in
the needs of our communities have required adjustments in service delivery and
flexibility in deployment of resources. 
Page 112 of 253

Page 113

2.2 A key strength with respect to social work service delivery in North Lanarkshire remains
a strong balance of care which has been sustained despite the challenges in service
delivery during the pandemic and recovery period.  We continue to benchmark well
nationally with respect to the proportion of adults and children, including those with
complex needs, who continue to receive support, including intensive support, within
their own homes and communities.  Work across all social work care groups also
continues to deliver improvement with respect to effective early support, for example,
through the testing of the three conversation model in adult services, enhancements in
family support and family group decision making for children and families and a
continuing focus on diversion in both adult and youth justice, 
2.3 Performance in some areas of the service has however been impacted by the
significant demand and workforce pressures outlined within the report and this has at
times impacted on responsiveness and our ability to consistently deliver the level of
high-quality individualised support which is our aim for all those whom we support.  This
has meant, for example, some people assessed as having less immediate or critical
needs having to wait longer for some aspects of service.  Pressures have been
particularly acute with respect to the delivery of home support services but are a feature
across many areas of the service.  In response, and as reflected more fully within the
report, a range of actions are ongoing to redesign and enhance services, maximise the
benefits of integrated working and to support the recruitment and retention of staff, 
2.4 Looking forward the report reflects on the opportunities for improvement in outcomes
for people arising both from national policy commitments such as the Promise and the
facilitative local context but also notes the risks to delivery of both improvement and
key functions arising from key demand, financial and workforce pressures including the
level of change capacity required.  This is particularly relevant to the uncertainties
introduced with respect to proposals for root and branch structural reform through the
implementation of a National Care Service (NCS).  The recently agreed establishment
of a Member Officer Group within the Council will support focus on this issue whilst
other issues highlighted within this report will also continue to be reflected through
established reporting structures in the year ahead. 
3. Measures of success 
3.1  N/A – Annual Report to meet reporting requirement. A range of outcome measures,
KPIs and specific service standards are applied across social work services. 
4. Supporting documentation 
4.1 Appendix 1: Annual Report of the Chief Social Work Officer  2021/22   
Alison Gordon
Chief Social Work Officer 
Page 113 of 253

Page 114

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
No direct impact though the report provides key evidence that the effective delivery
of social work services supports the Council in their delivery of Fairer Scotland
Duty.  As this is a retrsopective report no EQIA is required. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Page 114 of 253

Page 115

Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Whilst digital developments are a feature of service improvement and delivery
within social work all relevant changes reflected within the report have already
been considered through relevant governance processes. 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Key risks highlighted within the report are incorporated in relevant risk
registers.  The report itself is part of a wider framework of reporting which supports
the scrutiny of social work services and therefore aids the Council in its duties with
respect to the delivery of key statutory functions 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Where relevant issues are considered in planning for individual’s support, Where
relevant the service will also continue to consider the benefits of enhanced
arrangement for groups of service users.  An example of this is within our
Restorative Justice Service which has both a veteran’s group and has also
previously contributed  through unpaid work to linked community projects. 
Page 115 of 253

Page 116

1 
ANNUAL REPORT BY CHIEF SOCIAL WORK OFFICER: NORTH LANARKSHIRE 2021/22 
The Chief Social Work Officer Function 
The requirement that each local authority appoint a professionally qualified Chief Social
Work Officer (CSWO) is contained in Section 46 of the Local Government (Scotland) Act
1994.  The CSWO provides professional governance, leadership and accountability in
respect of the delivery of social work and social care services, including commissioned 
Services.  A key aspect of the role is to provide the local authority Chief Executive, Elected 
Members and the Integrated Joint Board with advice on social work service delivery and on 
cross-cutting issues and in parallel to promote understanding of the complexities  
involved in delivering the linked statutory responsibilities which require consideration of
need and the management of risk and liberties.  The then Scottish Office explicitly
recognised that the need for the CSWO role was driven by “the particular responsibilities
which fall on social services in that they affect personal lives, individual rights and liberties
to an extent that other local authority services do not.” (Circular: SWSG2/1995 May 1995). 
The CSWO also has a direct remit for decisions on a number of statutory matters including in
relation to secure accommodation, adoption and welfare guardianship as illustrated below. 
An additional aspect of the CSWO role is to inform the delivery of wider services which
support or impact on social welfare.  This is of particular importance in the current period of
post-pandemic recovery and the cost of living crisis, both of which have impacted
disproportionately on those within our communities who already face a range of adversities. 
In North Lanarkshire the CSWO role is held by Head of Children, Families and Justice
Services closely supported by the Head of Adult Social Work Services who holds delegated
responsibilities with respect to adult social work and social care, deputises in other areas as
required and works alongside the CSWO in relation to the other functions of the role.
Page 116 of 253

Page 117

2 
Annual Report 
The CSWO is required to provide an annual report in accordance with Scottish Government
guidance.  The format of this report was abridged during the pandemic to reflect a smaller
number of priority areas and in the light of associated demands and this approach has been
maintained for this reporting period.  This report therefore seeks to provide an overview of
social work service delivery in North Lanarkshire for the period April 2021 to March 2022
and addresses the following areas: 
• Governance and accountability arrangements, including partnership working
• Service Quality and Performance, including key service developments
• Resources
• Workforce
• Future Priorities 
The continuing impact of the Covid 19 Pandemic and emerging Cost of Living Crisis have
clearly been significant to the landscape of social work service delivery over this period and
this is reflected across the report.   
In this context and that of significant demand and staffing pressures, staff across the service
have showed remarkable resilience and a continued commitment to achieving the best
possible outcomes to those we support.  In presenting this report I would like to thank and
pay tribute to all staff involved in the delivery of social work services in North Lanarkshire
for their vital work over the past year and the persistence and flexibility shown in the face of
a particularly challenging environment.  I would also like to thank all internal and external
partners, carers, families and communities who have supported us in our work. 
Alison Gordon
Chief Social Work Officer (Education, Families, Justice and Integrated Practice) 
Page 117 of 253

Page 118

3 
1.   GOVERANCE AND ACCOUNTABILTY ARRANGEMETS 
Social Work Services in North Lanarkshire continue to play a critical role in supporting and
safeguarding our communities.  Adult Social Work and Social Care Services are delivered
though North Lanarkshire’s Health and Social Care Partnership (HSCNL) whilst Children,
Family and Justice Services are delivered through the Council’s Education and Families
Service, both arrangements support integration in service delivery with other key services. A
range of mechanisms, as reflected below, also ensures strong alignment is maintained
across social work in planning, delivery and professional support arrangements. 
The Social Work Service in North Lanarkshire directly employs around 2,800 staff and in
collaboration with commissioned services and partners are involved in providing support to
approximately 30, 000 individuals and families at any one time in addition to contributing to
wider partnership and community activity. 
Following previous structural changes, 2021-22 has been a year of relative stability with
respect to governance arrangements for social work therefore the core arrangements
described below will largely be familiar from previous CSWO reports.  I have however
highlighted both changes made corporately to continue to strengthen capacity to deliver the
wider Plan for North Lanarkshire as to well as to oversight arrangements as services begin to
move beyond initial emergency and resilience arrangements put in place during the early
period of the pandemic and referenced in my previous report.   
Moving forward it is clear that proposals for a National Care Service as reflected in the
consultation in autumn 2021 and the Bill published in June 2022 are likely to involve radical
change in the future governance of social work services.  During 2021-22 the Council and
HSCP responded to the NCS consultation whilst retaining a focus on continuous
improvement within current arrangements, a balance which will is likely to continue to be
necessary over the next period. 
Partnership working at local level remains fundamental to social work and a key aspect of
the role of the CSWO involves developing and sustaining effective partnership working and
relationships across a range of organisations and structures.  In addition to the specific
responsibilities of the CSWO to the Council and HSCNL the CSWO holds a key leadership role
within a number of local partnerships as well as contributing to the wider national social
work community 
Page 118 of 253

Page 119

4 
1.1   North Lanarkshire Council and North Lanarkshire Partnership 
The Plan for North Lanarkshire continues to set the direction for the council and partners. 
Its purpose is to communicate the shared priorities and provide a focus for activities and
resources around place making with a long-term vision where North Lanarkshire is the place
to Live, Learn, Work, Invest, and Visit and of inclusive growth and prosperity. It's a Plan with
a shared ambition that aims to ensure the benefits that this brings reach all our
communities, and that there is a much fairer distribution of wealth.  
https://www.northlanarkshire.gov.uk/index.aspx?articleid=1240 
It is centred on:
• improving economic opportunities and outcomes
• supporting all children and young people to realise their full potential
• improving the health and wellbeing of communities 
• enhancing participation, capacity and empowerment across our communities and
• improving North Lanarkshire’s resource base
The Plan is supported by 25 high level ambition statements and in turn by a Programme of
Work: https://mars.northlanarkshire.gov.uk/egenda/images/att90076.pdf   
att95824.pdf (northlanarkshire.gov.uk)
The CSWO, Head of Adult Social Work and Head of Planning, Performance and Quality
Assurance have lead responsibility for key areas of this programme but also a role in
ensuring connections are made across the wider range of corporate programmes of work,
which impact on areas which are important to those who use social work services, for
example, employability services.  Phased changes in the council’s management structure
have been implemented to support the delivery of the Plan and from spring 2022, the
CSWO/Head of Children, Family and Justice Services has also had operational responsibility
for Tackling Poverty and for Community Learning and Development and Resettlement
functions, creating further opportunity for integrated working in areas which have close
links with social work.
The Programme of Work is shaped and overseen by the Corporate Management Team and
through the council committee structure with the Adult Health and Social Care Committee
and Education and Families Committee having oversight of the delivery of social work. 
The overarching framework for partnership working in North Lanarkshire continues to be
provided by North Lanarkshire Partnership (NLP) which brings together the major public
sector agencies in the area along with Voluntary Action North Lanarkshire (VANL) the third
sector interface in the area. The priorities for delivery across the partnership are now
included in The Plan for North Lanarkshire. 
Page 119 of 253

Page 120

5 
The Children’s Services Partnership (CSP) continues to provide multi-agency governance
and strategic planning and direction for children’s services in North Lanarkshire. Children’s
Service Partnership Board membership includes Elected Members and HSCP/NHS Board
representation to enhance the coherence of children’s services planning across key
governance structures.  There is also direct representation of young people on the Board
though the Youth Council, Promise Development Team and Champion’s Board links.  Our
most recent Children’s Services Plan 
https://www.northlanarkshire.gov.uk/sites/default/files/2021-
08/North%20Lanarkshire%20Childrens%20Services%20Plan%202021-2023.pdf was
published in spring 2021 and is framed around the foundations of the Promise and UNCRC. 
Young people themselves were integral to the development of the plan with the Promise
Development team leading on the development of the vision and the Youth Council
undertaking a survey focussing on awareness of rights and leading on identification of
actions within the plan to promote and embed these rights.  The task groups supporting the
delivery of the plan have been reconfigured in line with the updated priorities with new
groups focusing on Voice and Family Support, the Corporate Parenting Task Group evolving
into the Promise Partnership Care and a refreshed Mental, Health, Wellbeing and Resilience
Task Group co-ordinating work including the establishment of new supports as part of the
Community Mental Health and Wellbeing Framework.  Social Work places a key role in each
of these strands with Senior Social Work Managers co-chairing 3 of the 4 task groups and
the Partnership’s Continuous Improvement Group.
The CSWO is lead officer for the CSP and chairs the Improving Children’s Services Group
which has oversight of the work of task groups together with the ‘Scaffolding’ and ‘People’
elements of the Children’s Services Plan. 
The North Lanarkshire Community Justice Partnership (NLCJP) currently also chaired by the
CSWO has responsibility for the oversight of Community Justice in North Lanarkshire.  The
partnership has benefited from the strong participation of partners and published the North
Lanarkshire Community Justice Outcome and Improvement Plan (NLCJOIP) in March 2017.
https://www.northlanarkshire.gov.uk/CHttpHandler.ashx?id=20573&p=0.
Due firstly to the pandemic and subsequently to ongoing work at national level on a new
Community Justice Strategy and revised Outcome Performance and Improvement
Framework, this plan initially published as a three-year plan, has since been extended and
supplemented by annual action plans to March 2023.  Interim planning has been informed
by an ongoing process of Strategic Needs and Strengths Assessment.  
The Community Justice Annual Report 2021/22 NLCJP 2021-22 Annual Report_0.pdf
(northlanarkshire.gov.uk) provides an overview of key activity during this period. 
Page 120 of 253

Page 121

6 
During 2020/21 arrangements for the North Lanarkshire Partnership’s Strategic Leadership
Board (NLSLB) were revised and new arrangements were agreed for the Community Justice
Partnership and Children’s Services Partnership Board to present on an annual basis to
enhance visibility and oversight.   This has now been implemented leading also to a wider
partnership focus on The Promise and commitment to further work to ‘Build a Promise
Community’.  A similar arrangement is now in place to present the CSWO Annual Report to
the NLSLB, with the intention of supporting increased visibility and ownership across the
partnership of public protection work (whose multi -agency governance is through the Chief
Officer Public Protection Group) as well as the wider work of social work and social care.
A key development in North Lanarkshire over the past two years has been the
establishment and embedding of nine Community Boards to support community leadership,
involvement and capacity building with each area focussing activity through a local outcome
and improvement plan (LOIP).  Social work services play a part in these supporting local
partnership structures with the CSWO undertaking the role of Community Co-ordinator for
one of the local boards and the Head of Adult Social Work and Head of Planning
Performance and Quality Assurance providing a link to the Health and Social Care
Partnership and its strategic commissioning activity across all Community Boards.  Senior
Social Work Managers also participate in area-based teams and the sub-groups which
support the delivery of the LOIPs. 
1.2   Health and Social Care North Lanarkshire 
The Integrated Joint Board and its Performance, Audit and Finance Sub Committee provide
the overarching governance structure for the partnership.  Both the Head of Children
Families and Justice Social Work Services/CSWO and the Head of Adult Services provide
professional social work advice to the Board.   The Mental Health, Learning Disability and
Addictions Partnership Board (chaired by the Head of Adult Social Work Services) and the
Frailty and Long Term Conditions Partnership Board (chaired by the Head of Health) have
the role of informing and implementing strategic direction on behalf of HSCNL across their
respective areas and maximising the opportunities provided by the integration of Health &
Social Care to promote best practice and guide the access for individuals to the right
support.  The Partnership Boards have been in place for a number of years and are currently
under review as part of the refresh of the Integration Joint Board’s new Strategic
Commissioning Plan 2023-26.
The current Strategic Commissioning Plan for the HSCP was published in March 2020
following an extensive engagement process with a wide range of service users, carers and
staff the covers the period to 2023:  https://www.hscnorthlan.scot/wp-
content/uploads/2020/07/Strategic-Comm-Plan-20-23-FINAL.pdf 
Page 121 of 253

Page 122

7 
The Plan identifies three key priorities:
1. People should be in control of the care they receive, and it should meet their needs
2. People are supported to maintain their independence and manage their care needs
3. People are supported and helped to avoid preventable conditions
These are also supported by a set of Ambition Statements which guides the work of the
partnership going forward:
• Do the right thing first time
• Provide a range of community support services to live well in connected
communities
• Focus on what matters to people (outcomes)
• Be at the forefront of technical and sustainable solutions
• Promote prevention and early intervention
• Ensure North Lanarkshire is the best place to work, volunteer and care.
The plan is supported by a programme of work which interfaces with the wider Plan for
North Lanarkshire and the wider council programme of work
Strategic-Comm-Plan-20-23-FINAL.pdf (hscnorthlan.scot)
North Lanarkshire Alcohol and Drug Partnership is hosted within HSCNL and has been
considerably strengthened over the last two years, co-developing its 2021-2024 strategy
around the themes of rights/respect/recovery through engagement with a broad range of
stakeholders :  https://mars.northlanarkshire.gov.uk/egenda/images/att99221.pdf 
Five ADP sub-groups have been established to develop actions covering: Prevention, Early
Intervention and Education; Treatment Care and Recovery; Whole Family Approach; Public
Health Approach in Justice and Reducing Alcohol Harms.  In line with the cross-cutting
elements within these key areas the interface between the ADP, CSP and CJP has also been
strengthened and whilst the  lead senior officer for the ADP is the Head of Planning,
Performance and Quality Assurance  both the CSWO and Head of Adult Social Work Services
have a role in the wider ADP structure. 
1.3   Support, care, practice and staff governance arrangements 
The Health and Social Care Partnership’s Support Care and Clinical Governance Committee
(SCCGC) continues to meet on a quarterly basis and is chaired on a rotational basis by the
CSWO, Medical Director, AHP Director and Nursing Director.  The terms of reference for the
SCCGC were updated in 2021 to reflect the organisational changes within the partnership
and Adult Social Work Services now report via two sector focussed groups.
In view of the need to maintain coherence in practice and staff governance across social
work functions and care groups the local framework for professional social is supported
both by Social Work Leadership meetings, whose frequency was increased to six-weekly in
Page 122 of 253

Page 123

8 
2022, and by quarterly Social Work Workforce meetings.  A brief fortnightly ‘Social Work
Solutions’ meeting also provides a forum for social work Heads of Service, Senior Managers
and Business Partners to address cross-cutting business issues.  
As reported in my previous report, a cross care group working group was established in
2021 involving senior and frontline managers, frontline staff and union representatives to
address the challenges presented by new ways of working and organisational changes,
initiated or escalated during the pandemic, and in particular the impact of more disparate
and remote working on social work practice and on practitioner support needs.  This group
focussed on how to maintain and enhance the delivery of high-quality services and support
staff wellbeing within the context of pandemic and in planning for recovery.  Notably it took
a trauma informed approach focussing on areas of safety, trust, choice, collaboration and
empowerment considered what was working well organisationally and in practice and areas
for development.  An initial action plan to address identified issues was developed in
conjunction with the social work leadership team and whilst the group has met less
regularly over recent months its work has informed priorities within wider strategic
workforce plans and has fed into planning for the new hubs and the linked operating model
within North Lanarkshire. 
A range of other processes are in place to support assurance around practice and service
delivery in social work services.  The Quality Assurance and Commissioning Team, hosted in
Adult Social Work Services, operates across social work and over 2021/22 its capacity has
been strengthened, particularly, to support the CSWO and service responsibilities for the
monitoring of the delivery of commissioned services.  The team which reports to the Head
of Planning ,Performance and Quality Assurance also lead on a range of other functions
critical to the duties of the Chief Social Work Officer including with respect to regulatory
activity, complaints management and overview, risk management and procurement and
provider sustainability as reflected in their annual report for 2021/22: 
https://mars.northlanarkshire.gov.uk/egenda/images/att99223.pdf 
Additional arrangements for multi-professional oversight of Care Homes and Care at Home
established during the pandemic have also been maintained although the frequency of
meetings has been reduced as the year has progressed and pandemic pressures have
reduced.  In addition, a Home Care Board continues to oversee the wider redesign of the
service. 
In addition to the role of the Quality Assurance Team all Senior Managers within social work
undertake regular performance reviews with their teams and support additional audit,
development and review activity to support practice standards, agreeing priorities with the
CSWO and Head of Adult Social Work Services.  With respect to staff governance the CSWO
and Head of Adult Social Work also maintain an overview of referrals to, and investigations
by, Scottish Social Services Council supported by HR Business Partners. 
With respect to less formal engagement with staff, whilst there has been a return to more
site-based working, and alongside this more direct team interactions over the course of the
Page 123 of 253

Page 124

9 
year, Senior Social Work Leaders have been conscious that their visibility as leaders and the
opportunity for less formal but direct face-to-face dialogue with staff has been impacted by
pandemic.  This has begun to be addressed through visits by the CSWO and other key
managers to teams planned over the summer of 2022 and this will remain a priority going
forward. 
1.4   Public Protection 
Leadership in the field of Public Protection remains a key responsibility of the CSWO and the
Head of Adult Social Work Services who collectively provide support to the Chief Executive
of the Council in his role as chair of the Chief Officers’ Public Protection Group (COPPG) to
which the MAPPA Strategic Oversight Group (MAPPA SOG), Violence Against Women
Strategic Group (VAWSG), Adult Protection Committee (APC) and Child Protection
Committee (CPC) report on a quarterly basis.   The CSWO chairs the Lead Officers Public
Protection Group and is currently vice chair of the CPC and chair of the Violence Against
Women Strategic Group whilst the Head of Adult Social Work Services is a key member of
the Adult Protection Committee.  The MAPPA Strategic Oversight Group operates on a pan
Lanarkshire basis with the chair rotating between the Police Scotland Public Protection
Superintendent and the CSWOs of North and South Lanarkshire.
The prioritisation of public protection remained a key focus both nationally and locally
during the pandemic period and recovery period and over the past two years both public
awareness raising, and monitoring have given close attention to areas in which the
pandemic may have increased vulnerabilities or impeded access to support.  
Whilst ongoing self-evaluation activity has continued, the pandemic resulted in the
temporary suspension of external inspection programmes relating to Adult Protection,
Children’s and Justice Services however these were again stood up during 2021/22. 
Although no external inspection of public protection functions took place during this period
notification of a Joint Inspection of Adult Support and Protection has since been announced
with related activity scheduled for summer/autumn 2022.     
By its nature Public Protection is an area of high residual risk and this is reflected on the
local authority risk register.  It was therefore, as previously reported, included in the
Council’s internal audit programme for 2020/21 with a focus on quality assurance
mechanisms. The audit report to Audit and Scrutiny Panel in September 2021 concluded
that assurance arrangements were generally satisfactory offering ‘reasonable assurance’ to
the council and noted the prioritisation of public protection during the pandemic period. 
Recommendations were made in three areas and included progression of further planned
self-evaluation of the Chief Officers Group and the strengthening of multi-agency action
plans including through use of SMARTer measures.  Action in these areas has been
progressed along with a small number of additional actions identified as a result of the
subsequent self-evaluation undertaken by the COPPG.   In addition, it is proposed to amend
the terms of reference for Chief Officers Group to incorporate reporting and oversight
responsibilities relating to Drug Deaths and Suicide and associated preventative activity
Page 124 of 253

Page 125

10 
reflecting both the broader focus of public protection taken during the pandemic period and
the additional ask of Chief Officer Groups linked to new national action plans for these
areas. 
The COPPG regularly considers the resourcing of multi-agency public protection activity and
following recommendations from the Lead Officers Group agreed in early 2022 also to
enhance capacity, for a 12-month period in the first instance, to support the enhancement
of MARAC arrangements locally as well as to create additional training and development
capacity to support the implementation of new national guidance in child and adult
protection. 
1.5   Engagement with the people who use support services and the Community and
Voluntary Sector 
Ultimate accountability for social work services is to those who use them, their families and
the communities of North Lanarkshire and Social Work Services and the CSWO play a key
role in ensuring that the voices of people who use and have experience of social work
services are heard, not only in individual planning, but that they inform the design and
delivery of the service. 
This approach is in line with the overall vision for the Council expressed in Delivering for
Communities and the importance placed on the role of Community Boards as outlined in
section 1.1 above.  HSCNL also operates within the framework of its Engagement and
Participation Strategy 2021-2024 which is designed to ensure the right systems and supports
are in place to enable effective engagement with stakeholders: 
https://mars.northlanarkshire.gov.uk/egenda/images/att95292.pdf 
The strategy builds on the strong foundations established to facilitate the involvement and
engagement of people who use services, carers, the community and voluntary sector, and
the independent sector and its operationalisation is supported by a Stakeholder
Engagement and Participation Strategy, Framework and Working Group 
Care Opinion also continues to be promoted with increased use of the platform to add to
the learning possible through complaints analysis. Care Opinion is an independent web-
based service where people can share their experience of services which has widened its
focus from health to health and social care. Partnership for Change, our local umbrella
forum for service user and carer involvement has supported this roll out and monitors and
presents on postings to relevant forums to illustrate issues of concern as well as positive
stories.   
Within Children’s Social Work we have continued to develop the use the Mind of My Own
App (MOMO) which helps young people communicate their views for meetings, raise
concerns or share good news in way that suits them.   With Children’s Services partners and
colleagues from the Council’s corporate communication team, the service has also
supported the innovative  Make It Right project, a campaign co-designed with young people
Page 125 of 253

Page 126

11 
and launched in January 2022 to raise awareness of children’s rights and a key stepping-
stone to embed these in practice in North Lanarkshire.  With respect to Children’s Services
the Partnership Agreement between the CSP and Young People was established in 2018:
https://www.northlanarkshire.gov.uk/CHttpHandler.ashx?id=21857&p=0 and continues to
form the basis for engagement with young people who are now represented directly on the
Board but with partners also making a parallel commitment through a range of other links
with the Youth Council and to the Champion’s Board which has over this period been
successful in significantly extending engagement and participation with younger children
experiencing care.   
The Promise Development Team, which has at its heart  Development Workers and
Assistant Support Workers with lived experience of care, was established in early 2021 and
has also been key to ensuring children, families and carers are central to service planning
and development both within social work and within wider services.  While awareness
raising remains part of their remit equally important has been their role in promoting the
wider engagement of children and families and direct contribution to practice and system
change. 
Building on this model and previous engagement with those with lived experience, Justice
Social Work Services have now also progressed the recruitment of two workers with lived
experience to support service development and provide peer support. 
Engagement with carers in North Lanarkshire remains equally critical to service delivery and
development and is undertaken through the framework of the Carers Strategy 2019-24
http://www.carerstogether.org/wp-content/uploads/2020/10/NL-Carers-Strategy.pdf 
which was developed in partnership with carers with a vision ‘to ensure, in partnership, that
North Lanarkshire adult carers and young carers are supported, represented and enabled to
build resilience, carry out their caring role and to live healthy independent and fulfilled lives’.   
North Lanarkshire Carers Together continues to provide an information and advice service
but also a network for carers to represent individual and collective issues and to contribute
to policy development, service provision and evaluation both locally and nationally, a role
which has been particularly valuable and important in ensuring carers voices are heard and
challenges understood during the pandemic period. 
Voluntary Action North Lanarkshire (VANL) continues to provide the key local interface with
the community and voluntary sector in North Lanarkshire and participates as equal partners
in the partnership structures described above and in a wide range of linked improvement
activity. This has included membership of the Children’s Services Partnership Board and the
ongoing involvement and facilitation of endorsed third sector networks linked to the
Community Justice Partnership. 
Within Health and Social Care, VANL have also continued to play a central role in developing
voluntary and community sector involvement through community capacity and carers
support work as reflected within the Community Solutions Strategy and delivery
programme, Softening the Lines 2018-23:
http://www.voluntaryactionnorthlanarkshire.org/sites/default/files/cs_strategy_2018-
23_softening_the_lines-converted.pdf
Page 126 of 253

Page 127

12 
Using 9 thematic leads to guide best practice and 6 locality host organisations to ensure a
truly community led approach a devolved budget of over 1m is directly invested in
organisations and community groups. A supporting commissioning plan and the programme
approach have ensured a focus on key outcomes with the budget also supporting the
leverage of additional funding and in-kind contributions.  The overarching aims of the
programme are to prevent isolation and loneliness and to address inequalities using
innovative approaches to support people to be more active and to reconnect to their
communities. 
The use of the Community Solutions model has also provided a vehicle within Children’s
Services to test out new models of support to address distress and promote positive mental
health with a significant portion of new Scottish Government funding targeted at early
intervention and community support through the Children and Young People’s Mental
Health and Wellbeing Framework allocated to organisations through VANL to develop new
supports in partnership with school clusters, children, young people and their families. 
Of key importance in social work across all care groups however remains the principle that
engagement, inclusion and empowerment are not seen as episodic events but also
embedded in day-to-day practice with a focus on good conversations and strength-based
approaches. 
2.  SERVICE DEVELOPMENT, QUALITY AND PERFORMANCE     
2.1 Support to Unpaid Carers 
As referenced in my previous report the ongoing impacts of the COVID-19 pandemic on
unpaid carers have been significant.   Many carers had to provide more care than
usual during the pandemic, and this has continued for some people with staffing and
demand pressures across the social care, social work and health sectors, both locally and
nationally, further exacerbating the issues faced by unpaid carers.  This has resulted in a
detrimental impact on overall well-being of many carers in terms of stress and anxiety
levels and the need to continue providing care for longer.   
Despite this, unpaid carers continue to provide support for those who otherwise may
require support from social work and health services and are the main source of support for
many people.  In order to support an increase understanding of carer experience both
nationally and locally including where we are making a positive difference, North
Lanarkshire noted an interest in participation as a site for more in-depth activity linked to
the the Care Inspectorate’s  national ‘Inquiry into carer’s experiences of social work and
social care service delivery’, with subsequent confirmation that linked survey and focus
group activity would take place over the period March to June 2022.  In the interim priority
has continued to be given to how support to carers can be enhanced: 
Page 127 of 253

Page 128

13 
A range of supports and services are commissioned to provide Carer support, inclusive of
the following key strands: 
• Lanarkshire Carers – Direct Support for Adult Carers
• Action for Children Young Carers Service – Young Carers Support Services
• North Lanarkshire Carers Together (NLCT) – Campaigning, information and
representation services
• VANL – Community Solutions Programme 
There are also a range of funded organisations who play a part in supporting unpaid carers,
including the Disability Forum and other condition specific and\or age-related support
organisations. 
We work in partnership with both commissioned services and funded organisations, all of
whom offer a range of supports to Adult Carers and Young Carers.   Overall, approximately
11,000 carers are known to the carer support organisations in North Lanarkshire and are in
receipt of some form of support. 
During 2021/22 1040 Adult Carer Support Plans have been progressed by Lanarkshire Carers
where assessed need was deemed to be low or moderate.  In situations where carer need
has been identified as being significant or critical and unable to be met through the range of
carer support options described above and below, approximately 50 individual Carer
budgets have been agreed.  In many instances individual budgets to supported people are
also scoped to reflect individual carer circumstances, such as complex care related needs,
caring responsibility for more than one person, or the carer’s own health related needs.  In
addition, over 1,000 carers benefited from small grants distributed through Lanarkshire
Carers.
Young Carers have been supported through Young Carer Statements, a wide range of carer
support and activity groups, training opportunities, resilience aid and support, respite
breaks, creative short breaks, carer awareness training and legal advice. A pan Lanarkshire
Steering Group focussing on the needs of Young Adult Carers was also established last year.
A key ambition is to ensure the needs of carers are integral to wider service planning, an
example being that following the success of a Community Link Worker initiative which
focussed on support, advice, guidance, and signposting to families whose child may have a
neuro-developmental condition, there are plans to extend this in 2022/23.  This has been
funded through Community Mental Health and Wellbeing Framework budget for children
and young people and is now hosted through North Lanarkshire Carers Together and in line
with our wider approach focusses on early, whole family support and community
connections.
There is a well-established short break service, operated by Lanarkshire Carers and this
continues to play an important role in supporting unpaid carers in enjoying a break from
their caring role.  Feedback from carers however has also pointed to the need for more
regular, flexible ‘time out’ accessible within their local community.  This has informed a
range of new initiatives including a ‘Carer Breather’ programme, facilitated through NLCT
Page 128 of 253

Page 129

14 
and delivered by a range of local organisations and the piloting of a ‘Sitter Service’. These
initiatives offer unpaid carers regular and flexible breaks from caring. Positive feedback from
unpaid carers regarding this approach will result in an expanded programme in the coming
year. 
Work is also ongoing to meet the requirements of the Carers Act to ensure that unpaid
carers are as involved as they want to be in hospital discharge arrangements. This includes
involvement in decision making, as well as support at the point of discharge and beyond.
Whilst this approach has been welcomed, we are aware through feedback from Carer
Support Organisations, Advocacy, and individual carers that further work is required in this
area, to ensure that no involved unpaid carers are missed from discharge planning as a
result of pressures to work at pace in this area.
We remain aware also of the diversity and fluidity of the carer population and that despite
our efforts some carers remain less visible to services and supports.  We continue to
innovate and use a range of methods to ensure information and support is accessible, from
the more traditional information packs to the launch of a new podcast for carers and
support for digital inclusion. 
2.2 Justice Social Work Services 
During this period criminal justice service activity has continued to be delivered as per our
legislative responsibilities, and during periods of restrictions related to the Covid-19 pandemic
in accordance with emergency legislation, health and safety, and social distancing measures. 
In common with all social work disciplines the most significant challenge for Justice Social
Work Services throughout the reporting period was the impact of the restrictions and the
challenges associated with fulfilling statutory obligations, managing risk, and supporting our
most vulnerable service users and their families including those with unstable or chaotic
lifestyles.  To assist with this a Red/Amber/Green (RAG) risk management system was
implemented to ensure that those most in need or at the highest risk were prioritised, and
appropriately supported. This was reviewed on a weekly basis by both front line and senior
managers ensuring that throughcare licences, drug testing and treatment orders and
community payback orders were managed and supervised through a combination of regular
home visits and contact via virtual platforms and telephone calls. 
Community Payback Orders (CPOs) 
Covid-19 pandemic restrictions necessitated the closure of unpaid work across North
Lanarkshire for two periods during 2020/21 and 2021/22.  As these restrictions began to
ease recovery planning was crucial to support the transition from a partial, to a fully
operational service and in the initial stages of recovery service users were able to attend
unpaid work in a limited way and in fewer numbers. 
Part of the approach to recovery has continued to involve increasing the opportunities for
unpaid work to be undertaken at home supported by the completion of appropriate risk and
Page 129 of 253

Page 130

15 
health and safety assessments. This approach has permitted some orders to be completed
without the need to submit requests for extensions to an already burdened Court Service. 
The continuation of this hybrid working model, alongside traditional unpaid work, together
with successful partnerships with the third sector has supported the delivery of 53,464
unpaid work hours during 2021/22.  This figure is close to twice the 27,600 hours completed
in 2020/21 but still substantially less than 85,116 hours delivered pre-pandemic in 2018/19. 
The number of outstanding unpaid work hours, an area of national concern, has also
fluctuated, dropping initially from circa 54k in February 2021 to circa 34k in April 2021 due
to one-off commutation of some hours on some CPOs facilitated through emergency
legislation and new approaches in service delivery but standing at circa 47k as of May 2022
with the impact of an escalation in orders made as court activity increased counter-
balancing innovations in practice to enhance capacity.  
In recognition of the longer- term impacts of the pandemic on the whole justice system,
temporary funding was provided to justice social work by Scottish Government to enhance
capacity for both core and commissioned services in 2021/22.  This will be continued in
2022/23 although the temporary year on year nature of the funding has created a number
of challenges in service planning and recruitment.
A fuller report on the delivery of Community Payback Orders over this period is available:  
att99332.pdf (northlanarkshire.gov.uk) 
The following examples however illustrate the range of unpaid work opportunities that
were made available across North Lanarkshire during this reporting period:
• Over 203 bicycles were distributed to North Lanarkshire residents though the
Restorative Justice bike workshop at no cost. A by-product of this was the assistance
and support it gave to individuals in terms of the potential to maximise their health
and wellbeing.  In addition, the service has given help to local communities by
offering bike maintenance and repairs. This project has particularly assisted those
children, young people, and families who are unable to afford the cost of bikes or
their repair. Bikes have also been given to victims of bike theft.
• The Wood Workshop has enabled the creation of useful items for various community
groups, such as outdoor classrooms and activity equipment for schools, and planters
for sheltered housing complexes.
• The Laundry workshop has helped to ensure that donated clothing such as school
uniforms could be repaired, cleaned and ironed prior to distribution to families and
individuals in need.
• Within our craft activity groups items were made and donated to local organisations
or sold at fayres with the money raised being donated to local charities.
• Squad placements assisted with the completion of projects in local communities
such as landscaping.
• Several private placements were maintained in various settings including local
churches, allotments, sheltered housing complexes and charity shops
Page 130 of 253

Page 131

16 
• As previously noted, unpaid work home working for appropriate service users was
employed throughout the pandemic. These arrangements benefitted community
partners including the Police Scotland Dog Unit, SSPCA, NHS, Wildlife Trust, Housing
and Leisure and Recreation colleagues, and the wider community. This resulted in
5,650 hours of home working being completed during this reporting period.
Whilst group work to support the ‘other activity’ element of orders was restricted over this
period, the additional funding provided by the Scottish Government for recovery purposes
permitted the continuation of the delivery of ‘other activity’ from third sector providers
through both digital platforms and more limited face-to-face delivery: 
1. The Wise Group delivered a group-based programme designed to provide
information and awareness on topics such as managing mental health, dealing with
negative thoughts and emotions, dietary and physical health benefits, financial
inclusion and budgeting, building positive networks, dealing with conflict, support
with employment and training possibilities, and alcohol and drug education. 
2. Love Learning worked with service users on an individual basis to address literacy,
and social isolation difficulties.
3. Street Cones designed a group work activity to support individuals through the
maximisation of their skills and potential by involvement in the creative arts.
Participants wrote a script which they subsequently performed.   
The quality of North Lanarkshire Council’s Community Payback Order delivery is continually
assessed, and the perspective of service users and community projects supported is
regularly sought as reflected in our annual CPO report (link above) 
Diversion from Prosecution 
In line with the Vision for Justice in Scotland the service continues to prioritise the
promotion of Diversion from Prosecution.  To ensure consistency of practice in this area
multi agency briefing events have continued to take place with relevant social work staff,
police colleagues and the voluntary sector. Diversion from Prosecution referrals in North
Lanarkshire continue to be above the Scottish Average, and the numbers have been
consistently high throughout the pandemic. 
Diversion 2021/22   
Male Female Total
Number of Referrals 255 98 353
Number of Assessments Undertaken 240 93 333
Number of Cases Commenced 134 61 195
Number of Individuals for whom cases commenced 123 61 184
Number of cases successfully completed 117 57 174 
Page 131 of 253

Page 132

17 
Offence focused interventions 
People subject to supervision by justice social work are supported to recognise and address
wide ranging and often complex personal and family issues as well as undertaking offence
related work. Developing a strong professional relationship is a key element of the
supervision experience and is fundamental to effective engagement and positive outcomes.
Staff utilise Risk Management Authority approved risk assessment tools to assess risk and
need and to implement appropriate responses to addressing criminogenic needs.   The
Justice Outcome Star has been developed over several years to support more meaningful
engagement and to contribute to the measurement of both individual outcomes and the
impact of interventions at service level within Justice Social Work Services. The aggregated
information from this tool is used both to support Strategic Needs Assessment and service
planning.
Offence focused Interventions take place both on a one-to-one basis and within groupwork
settings, although due to pandemic restrictions, the capacity to safely deliver groupwork
was severely compromised over this period placing more reliance on 1-1 delivery.  The
approach is based on “Good Lives” principles and includes general offence focussed work,
for example, managing strong feelings, handling conflict, dealing with relationships, anger
awareness, managing impulsive behaviour, goal setting and planning.   More intensive and
targeted interventions encompass MFMC (Moving Forward Making Changes) and our UP2U
domestic abuse programme.  More detail on these programmes is provided below. 
UP2U Domestic Abuse Groupwork Programme 
UP2U ‘Creating Healthy Relationships’ is now fully operational across the Justice service and
can be accessed by individuals who are subject to statutory supervision because of their
involvement in domestic abuse offences. The programme is delivered by justice social
workers in a case management setting on a 1:1 or a 2:1 basis. The service also has a
centralised UP2U team to support locality teams with the delivery of the programme to
high-risk individuals who are screened using our new UP2U screening panel process. The
programme can also be delivered in a group work setting, however, capacity for this has
been limited over the pandemic period.
Justice Services also utilised a proportion of covid recovery monies during the reporting
period to purchase a training programme for 56 staff across children and families. This
allowed for the implementation of the ‘UP2U Family Practice’ intervention for non-court
mandated individuals. This version of UP2U is designed specifically for child and family
practice scenarios where unhealthy domestic abuse relationship behaviours exist. This
approach provides a vehicle to respond to the need for domestic abuse behavioural change
work across both children, families, and justice services. 
Moving Forward Making Changes 
As part of revised and newly implemented Criminal Justice Social Work structure a
dedicated Moving Forward Making Changes (MFMC) Team was established in August 2021.
Following the easing of Covid-19 health and safety restrictions a steady resumption of face-
Page 132 of 253

Page 133

18 
to-face MFMC programme delivery during the period 01.04.21 to 31.03.22 has been
possible. 
Other Justice Services: 
The Women’s Community Justice Service has continued to work holistically to address the
specific needs and issues of women within the justice system over this period enhancing the
provision of practical support where required including the use of technology to facilitate
participation.   Justice Throughcare provision has also remained a priority to ensure those
leaving custody receive appropriate levels of support to address their risk and facilitate their
reintegration from prison to the community. The linked Community Bridges Project was
maintained throughout the pandemic period and continued to support people who have
difficulties with substance use and who are being released following a short-term prison
sentence.  The Drug Treatment and Testing Order team maintained its focus on intensive
support services to 35 individuals in total during the reporting period. The specific challenge
in this area of work was associated with the withdrawal of drug testing provision during the
period of Covid restrictions, and its limited reintroduction thereafter.  It is anticipated that
this service will be fully restored during the coming year.  Finally, the Prison Social Work
Team based at HMP Shotts has maintained site-based provision, continuing to work closely
with SPS colleagues to assess and support prisoners and their families.  In addition to
statutory work the team delivered child protection awareness sessions to SPS staff resulting
in an increase in child welfare referrals.   
Tackling Poverty and Exclusion 
In addition to a focus on the above work the team have continued to integrate actions to
address poverty and exclusion within day-to-day practice recognising the corrosive impact
of both on both those involved with the service and our communities.  This has included:
• Income maximisation, generating £58k in monies for over one hundred adults and
families
• Working with the Connecting Scotland Scheme to address digital exclusion and
secure devices/solutions for a number of service users
• Prioritising recovery of access to the Keep Well nursing service to support address
the health inequalities and poor mental and physical health often experienced by
justice service users, and with respect to community support:
• Staff and service users supported foodbanks in Coatbridge and Airdrie by collecting
food and distributing food parcels 2 to 3 times per week.
• 491 gifts for younger children and 343 gifts for older children were given out over
the festive season. Christmas and New Year meals were also provided for vulnerable
adults and families by local restaurants, and Restorative Justice staff distributed
these.
• Working in partnership with local charities the service has laundered donated school
uniforms and assisted in their distribution to the families that required them. 
Page 133 of 253

Page 134

19 
2.3 Children and Families Social Work Services 
Keeping The Promise 
Following publication of The Promise by the Independent Care Review in February 2020,
cross-party commitment to support delivery was made by North Lanarkshire Council in
August 2020, thereafter with the intent of working across council services and with the
Scottish Government, partners and care providers to deliver the necessary changes. 
Children and Families Social Work has a key leadership role in this and is uniquely placed to
drive and connect the key strands of work required to support the ambitions of the Promise
and the required transformation of systems, outcomes and experience for children and
families.  This is due to the key statutory role social work plays in supporting children and
young people and their families both for ‘children in need’ and those experiencing or who
have experienced care and the underpinning values of inclusion and empowerment
alongside a culture of partnership working.  Social work therefore has a key role to play in
transforming both family support and care. 
Following a reduction in demand in 2019/20, primarily in the initial stages of the pandemic
referrals to children and families social work services have grown over the past two years
and in 2021/22 were 15% higher than in 2018/19.  This appears to reflect increased need for
support from children and families within our community.  Although further work is needed
to fully understand the picture which sits behind this, the change is perhaps unsurprising
given the evidence that the pandemic impacted disproportionately on those who already
faced the greatest adversities, including on children’s early development and wider
wellbeing, and that families are now also adversely affected by the emerging cost of living
crisis.
Year
Number of
Referrals
2021/22 10858
2020/21 10253
2019/20 9077
2018/19 9519
2017/18 9654 
Balance of Care     
Placement Type
31 March
2019
31 March
2020 
31 March
2021
31 March
2022
Foster care (NLC) 119 100 112 94
Foster care (Independent) 47 67 61 53
Home Supervision 294 298 227 188
Formal Kinship Care 296 355 321 307
Informal Kinship Care 150 153 170 183
Residential (NLC) 27 28 27 33
Residential (Independent) 12 13 11 11
Secure* 4 0 2 1
Continuing Care 39 45 53 73
Page 134 of 253

Page 135

20 
Overall, the above table shows that the number of children and young people experiencing
formal care has fallen over the past year.  A focus on family support, strengths-based
practice and integrated working has enabled North Lanarkshire to continue to achieve fewer
children looked after per head of population than the national average.  We also used
residential care proportionality less than the national average.  Despite this, there was an
increase in young people in our children’s houses for three main reasons:  our commitment
to providing support to unaccompanied children seeking asylum in a nurturing and safe
environment, our openness to taking older young people back into care when they need
and ask for it and the growth in continuing care.   Following a drop of a third in numbers of
children and young people supported in external residential placements over 2018-21  the
number has plateauedespite a longer-term commitment to providing support Close to
Home.  This is due to a number of factors relating both to demand, complexity of need and
the long-term nature and supporting relationships associated with some of these
placements.  Nonetheless it remains a key priority of the education and families service to
ensure increased capacity to support young people with complex needs within the North
Lanarkshire community.  This also drives efforts to recruit more ‘in-house’ foster carers. 
While there were slightly fewer in children in foster care, our focus on supporting and
encouraging young people remain with their carers for as long as they need meant a
continued and sustained increase in the use of continuing care with the effect that some of
our foster and kinship carers are now ‘continuing carers’.   The COVID-19 pandemic
coincided with a significant decrease in the number of children looked after at home and
this trend has continued.  The reasons for this continue to be monitored as it is not yet clear
if this is the result of preventative support and early help or a continued disruption to
processes following the pandemic. 
Involving Young People 
A key development led by Today Not Tomorrow (part of our Champions Board Structure)
has been the production of an online resource to support managers and practitioners on
how to improve record keeping with a focus on the impact of language.  Awareness raising
sessions by the Promise Development Workers took place with some managers and
practitioners, with further role out planned.   Several young people were also involved in
scoping and framing the key qualities required of mental health support for Care
Experienced Young People, work they had the opportunity to showcase at a national event,
Tending the Light, which formed part of the festival of care in February 2022.  This work led
on to young people codesigning and taking part in the council procurement process for a
new bespoke service.  A helpful by-product of this, is our corporate commissioning and
corporate staff asking for specific training on The Promise so they can support meet the
ambitions of the council and our children and young people.   Our Promise Development
Workers were also involved shaping the development of our services in response to young
people in conflict with the law and contextual safeguarding. 
Page 135 of 253

Page 136

21 
A Good Childhood
Achieving a loving and caring home: Children and young people experiencing care
The positive role children’s houses play in providing care and love to children and young
people continued to develop over the year as the culture changes associated with keeping
The Promise became more established. In particular, the service facilitated 3 young people
returning to the houses as younger adults, because of trauma and crisis in their lives, in line
with the aspirations of young people’s right to ‘return to care’ if necessary. 
The Promise Plan 21-24 sets out clear expectations in reducing the use the use of the
restraint and our children’s houses were and the serviced participated in a pilot project
funded via the Promise Partnership Fund, on partnership with Aberlour and Kibble, to help
us achieve this ambition. A core group of 8 staff were identified to take the work forward
and the first step in the project plan is to remove the use of the Prone hold by the 31st of
January 2023.
A significant development over the year has been the introduction of the National Transfer
Scheme requiring all local authorities to accept transfers of children into their care,
providing crucial placements to unaccompanied asylum-seeking children. To this end our
children’s houses played a critical role in providing care to 14 unaccompanied children to
ensure that their individual support needs were more fully assessed, and they received wrap
around support whilst they settled in Scotland, starting their recovery from trauma. Another
4 young people went straight into supported care placements with 3 progressing from
children’s houses to supported care placements. While this has placed increased demand on
our children’s houses and supported care, the service has taken the view that this has been
a child centred approach to supporting children who have come to the UK unaccompanied.
We also appointed a social worker to specialise in working with and supporting this group of
young people.
Achieving a loving and caring home: Support to family-based carers
The Children’s Carers’ Service provides support to kinship carers, supported carers of young
adults, as well as to adopters and foster carers to achieve permanent loving homes for
children and young people into adulthood.   
Over the course of the year the team received 120 initial enquiries about fostering or
adopting and of these, 63 progressed to initial interview. 21 enquirers progressed to
preparatory groups and of these 14 went on to submit an application to foster or adopt. 
This represents a 38% decrease on previous years, reflecting national trends.  To meet this
challenge the team established a new and creative recruitment strategy.  This has a
particular focus on new and changing needs, including the council’s commitment to find
homes for unaccompanied asylum-seeking young people, and young people with complex
needs to allow them to remain in North Lanarkshire.  The team also worked with North
Lanarkshire’s resettlement team to undertake initial assessments and support for Ukrainian
host families. 
Page 136 of 253

Page 137

22 
The engagement and participation of care experienced young people continued to be highly
valued in the delivery of the service and young people supported and actively contributed to
the recruitment and preparation groups for prospective adopters and foster carers. 
Brothers and Sisters 
Development in this area is not without challenge and over the year 65% of children in care
were separated from at least one brother and sister.  In response to this analysis, the team
developed a new strategy, co-led by the Promise Development workers and involving
carers, to support brothers and sisters stay together when they need to be cared for away
from home.  This comprised specific support to carers as well as a focus on recruiting carers
with the capacity to look after brothers and sisters together. In addition, a revised
framework for assessing family time was implemented, with the voice of children and
parents central to more creative approaches to family time, while keeping children safe. 
Adoption 
This service provided a range of support and advice to 60 adoptive families. This comprised
individually tailored post adoption support as well as support groups and training specific to
adoption. The team experienced an increase in demand for post adoption support services,
leading to a planned review of the whole service that has now commenced to ensure it
meets all needs and offers timely support to avoid families reaching crises, providing the
scaffolding required as outlined in the key messages of The Promise.   This review will
include consideration of an apparent increase in the small but significant number of
adopted teenagers required to move to alternative arrangements over the past year, often
residential care. 
As part of the team’s commitment to learning and development, the service participated in
national research including researching the impact of Dyadic Developmental Psychotherapy
(therapeutic support to adoptive and permanent fostering families) led by Oxford and
Glasgow Universities.   
Permanence Planning 
The service continued to play an active role in leading developments in permanence
planning for children to avoid drift in care planning. A number of new initiatives were
started or refreshed including: 
• Senior practitioners within the Children’s Carers team supporting locality social
workers to increase capacity and progress permanence planning. 
• New Permanence Planning Training was developed and launched to reflect new
legislation and research and as part of North Lanarkshire’s commitment to relational
practice in line with The Promise.
Kinship Team 
In response to growing need, the kinship care team continued to expand to comprise 1
senior social worker, 3 social workers, 1 support worker and 1 support work assistant.  The
Page 137 of 253

Page 138

23 
team had a busy and successful year with 106 new kinship carers approved, and ongoing
dedicated emotional and practical support provided to 170 kinship carers.  In addition, the
team co-facilitated 7 kinship carer groups across North Lanarkshire in partnership with
Nurture Scotland and CLD.   
Whole Family Support
Family Group Decision Making & Lifelong Links
Family Group Decision Making (FGDM) is a strength-based way of working which takes a
structured approach to involving wider family and support network in decision making and
planning for children and families. It is rights-based and aligned with the principles of
UNCRC. Research in Scotland has found very good outcomes associated with this approach
in reducing the risk of accommodation (Mitchell et al, 2018). As such FGDM is a key
component of North Lanarkshire’s commitment to keep The Promise by supporting and
nurturing relationships within families and preventing the accommodation of children
wherever possible. 
Over the year April 2021 to end of March 2022, the FGDM service made considerable
progress in successfully supporting children remain within, or return to, their families.  Over
period the service had two full time FGDM Co-ordinators.   
Family meetings achieved the following outcomes: 
• Based on referral dates for the year April 2021 to March 2022, 23 meeting were held
and family plans were made for 32 young people, involving their family networks of
support. 
• All 32 young people were supported to reduce the risk of them being
accommodated, part of a rehabilitation plan, support new babies stay at home with
their family or to support kinship placements.
• 12 children referred as at risk of coming into residential or foster care, 11 have
successfully remained living with parents or family members. One child was
supported with family and friends but unfortunately this wasn’t sustainable and is
now supported in a children’s house with family support. 
• 6 babies whose names were placed on the Child Protection Register pre-birth as at
potential risk of significant harm, 5 have been supported to remain safely in the care
of their parents post birth and one in a kinship placement. 
Family meetings avoided significant placement costs to the service but most importantly
family meetings have enabled children to benefit from loving and safe relationships within
their families. 
In January 2022, the service was successful in securing funds for two additional coordinators
from the Promise Partnership fund to implement and approach to family group decision
making called ‘Lifelong Links’.  Lifelong Links seeks to create life-long social networks for
children and young people in care and aftercare, providing them with practical and
emotional support. Lifelong Links uses tools and techniques to identify family members and
other adults, such as former foster carers or teachers, who care about the child or young
person. These individuals can then be brought together in a lifelong links meeting to
Page 138 of 253

Page 139

24 
develop a life-long support plan for the young person.  This outcomes of this will be
presented in next year’s report. 
Intensive Services 
Intensive family support that is available to families when they need it, including out of
hours and at weekends, is provided by our intensive service.  The primary objective of the
service is to ensure that children and young people are able to remain in or move to family
where they feel they belong and are safe. During this year work in the team was concluded
with 202 children and young people, of which this objective was achieved for 153 children
and partially for 20 children and young people. There were 18 children and young people
where this outcome was not a focus of intervention and 11 children and young people
where this outcome was not achieved.  To promote the involvement of the children, young
people and their families in the development of the service, some young people coproduced
a set of service standards with staff so that families are clear what can expect and have a
right to from the service.
With the easing of COVID restrictions, intensive services also stood back up group work and
other activities to promote the wellbeing and resilience of children and young people.  For
example, through the provision of intensive support some young people achieved their
Duke of Edinburgh Bronze Award and are now able to progress their DofE awards through
North Lanarkshire’s universal offer.  Some young people were involved in singing coaching
and playing instruments and others produced their own DJ set whilst learning the skills to
use the associated technology. The service also delivered parenting support delivered on a
1-1 and groupwork basis and learn to cook family participation sessions. 
During school holiday periods the team has assisted families with access to activities in the
local community and further afield to ensure positive experiences for children and young
people. This included a sports day, walking group, swimming group and supported family
outings. 
Young People in Conflict with the law
Support from custody
As part of our Intensive Service, the Youth Bridges team supported 58 young people under
the age of 21 who had experienced custody. 21 were new admissions to Polmont within this
period. This is consistent with the downward trend in admissions to Polmont from North
Lanarkshire although may have also been affected by Court restrictions through Covid.
Youth Bridges staff ensured that 72-hour reviews were held within the prison to discuss
vulnerabilities and support for these young people. Five (24%) young people were care
experienced, a significant reduction from the past two years (56% in 2019/20 and 50% in
2020/21). 
Youth Bridges uses the Outcome Star to identify areas requiring support and to measure
outcomes. Over the year ten domains of the Outcome Star showed improved outcomes of
at least 65% for the young people closed to the service, with reduced offending for 88% and
reduction in drug / alcohol use for 69%. 
Page 139 of 253

Page 140

25 
As part of the commitment to meet the requirements of The Promise Plan 21-24, the service
reviewed its approach to young people in conflict with the law.  We found that 182 children
were referred to the Reporter on offence grounds - a higher rate than the national average.
However, SCRA only referred 7 of these children to a Hearing on offence grounds, reflecting
the strong partnership commitment to the welfare principles of Kilbrandon.  We still have
work to do, however, to maximise the use of the Children’s Hearings and diversion rather
than the court:  In 2021/22 only 4 young people (under the age of 18) were remitted to the
Hearing by the Sheriff court for a disposal, 5 young people were remanded or sentenced to
custody and 7 were made subject to a Community Payback Order.  This resulted in the
development of a small team to work in partnership SCRA to use hearings more effectively
to support relational working and robust alternatives to custody, remand and court
disposals. 
Moving on: Supporting Care Experienced young people who have left care
In response to our recognition of our need to provide more intensive and integrated support
to care experience young people, the newly established team of three support workers and
two social workers within intensive services has proactively reached out to young people
and responded to young people returning for support to provide the care they need.  As at
March 2022, 141 young people were receiving support representing an increase of more
than a third since the start of the pandemic.  66 care experienced young people were
supported directly from Intensive Services, many of whom have reconnected with the
service over the past year. 
A key area of improvement has focused on a ‘hub’ approach delivered from the Intensive
Services building to ensure awareness of the rights and entitlements of care leavers and
promote a ‘no wrong door’ approach across the multi-agency partnership. The building is
used by many care leavers to receive support from the service or other agencies. A new
protocol with housing was also agreed to ensure housing support was arranged around the
needs of young people. Each locality in North Lanarkshire now has a housing champion
advocating for care experienced young people.  
Tackling poverty has been a key priority and the council did not reduce payments to care
experienced young people in line with the UK Government’s decision to end the temporary
uplift to Universal Credit. 
A Right to Education: The Virtual School 
North Lanarkshire has continued to strengthen its commitment to care experienced children
and young people to access education and close the attainment gap through the Virtual
School. The Virtual School is a small multi-professional team, which supports the
improvements in capacity and responses across the education system as well as co-
ordinating and providing direct bespoke support for children and young people. The Virtual
School maintains an overview of education planning and support for all care experienced
learners.
The Virtual School works in an integrated way and has formed productive relationships with
community learning and development, local businesses and many other relevant partners in
addition to strong connections with schools and other education and social work services.
Page 140 of 253

Page 141

26 
During the 2021/2022 school session, the Virtual School received 89 new requests for direct
support and worked with 242 learners. The Virtual School supports young people through a
wide range of activities including well-being programmes – improving physical and mental
health, vocational learning opportunities, outdoor learning, literacy and numeracy
programmes including direct support for SQA qualifications, volunteering/mentoring
opportunities, individual learning engagement projects, transition supports and access to
specialised resources e.g., counselling. Support interventions are delivered in a setting
specific to the needs of the young people involved with intensive staffing provided to
increase confidence levels and ensure any barriers to engagement are addressed. 
The Virtual School seeks to accredit young people for their learning undertaken during these
activities through wider achievement awards including for example, John Muir, Young STEM
Leader and Saltire or additional qualifications such as Forest and Outdoor Learning Award
(SCQF 2 and 3), Cosmetology (SCQF Level 4) and City & Guilds Introduction to Automotive
Engineering (Level 1). In session 2021-22, 108 such awards were achieved.
Through Virtual School, teachers also deliver 1-1 or small group teaching sessions, with a
specific focus on S4 pupils at risk of leaving education without any formal qualifications and
learners at significant risk of disengagement with education. The direct impact of the former
being the achievement of 81 SQA national 3 or 4 qualifications achieved by 32 young
people.
The Virtual School coordinates an intensive support offer for a number of vulnerable
families across school holidays. Over summer 2021, the intensive offer was aimed at care
experienced families including kinship groups and other targeted groups.  Offers made were
wide-ranging and included a variety of activities for young people and their families to
enjoy, for example, leisure passes, access to summer activity camps, family days out
(including cinema and bowling trips), Cooking Together sessions and bespoke health and
wellbeing interventions. In total, 1339 individual offers at the intensive level were accepted
by 402 children and young people.  In addition, 74 families were supported with a direct
payment to facilitate a bespoke package of support in circumstances of particular need. 
Removing exclusions of care experienced learners from school, aligning with the ambition of
the Promise Plan 2021-24 is a target for Virtual School. Staff work in collaboration with
schools and wider services to support the development of trauma informed practice and to
seek alternatives to exclusion. For care experienced learners over three sessions (August
2019 to June 2022), data gathered demonstrates a 48% reduction in exclusion episodes, a
59% reduction in school days lost due to exclusion, and a 39% reduction in the number of
care experienced learners excluded from school.
Education within Intensive Services
Within the intensive services base in Coatbridge, bespoke education was provided to 18
young people in need of enhanced support.  Four were school leavers and achieved various
qualifications in National 3 and 4s. The young people in the school were supported by
intensive services support assistants to engage in their education programme and with
some practical skills and activities.  As part of our intensive service offer, we have an
operational garage, The 7 Day Centre, that offers experiential learning in automotives and
Page 141 of 253

Page 142

27 
mechanics. Over the year the centre offered 9 young people vocational placements. One
young person was supported to access a college course for mechanics, and this commenced
in August 22. One young person evidenced the skills and ability to pursue mechanic but was
not ready to undertake other available routes to further their training or employment. The
young person has been supported to maintain their placement at the 7 Day Centre through
NL Roots: Opportunity for Growth programme, which is placement and learning
programme for young people who are or have experienced care. The young person is being
supported to continue their learning in automotives and mechanic whilst increasing skills,
options and readiness to pursue further careers options.  To ensure the young people within
these settings benefit from more robust pathways and the full range of educational
opportunities, the 7 Day Centre and intensive service education base are being integrated
into the We Aspire Academy. 
2.4 Adult Social Work Services 
In common with other social work care groups there have been a number of challenges to
the delivery of Adult Social Work Services over the year due to the impact of the pandemic
and both associated and underlying demand pressures as well as recruitment challenges in
key areas.   Significant work has been undertaken, both to reinstate support services that
had been reduced due to the pandemic and to continue to redesign services.  This report
therefore reflects the challenges experienced in maintaining high-quality care in line with
statutory and regulatory requirements as well as ongoing work to redesign and improve
services to support improved outcomes for individuals. 
Investment in Adult Social Work and Social Care through the Winter Planning and Enhanced
Support funding stream from the Scottish Government was introduced  during the course of
2021/22 to increase capacity in direct provision as well as to improve assessment capacity, 
nonetheless the volume and complexity of demand profile alongside workforce challenges
have resulted in significant operational and capacity pressures across the whole of health
and social care provision and we have seen this in particular with respect to Support at
Home, Mental Health Officer activity and also in adult protection where the resourcing of
large scale investigations has been required against a background of existing high demand. 
The narrative below provides further detail on service activity, performance, innovation and
improvement as well as areas of challenge. 
Early and preventative interventions – Right Support, Right Time 
First Point of Contact 
A major focus for the Health and Social Care Partnership is to ensure that when people
contact health or social work services the response is rapid and appropriate. There should
be a focus on assisting people to be independent and getting things right first time. The core
of which is a strength-based approach, transferring the balance of care to prevention, early
intervention and self-management. 
Page 142 of 253

Page 143

28 
In order to explore a whole system change a pilot project was undertaken in Motherwell in
2021 using the Three Conversation Model.  Partners 4 Change who led on the delivery of the
model have experience of working with 75 council areas in the UK in relation to reform,
redesign, financial sustainability, and personalisation. Of the 75 councils, 35 councils were
judged to have used this to support whole system change. 
Here the evaluation of the Motherwell innovation site in 2022 deemed it to be a success
with much learning. The aim was to build a whole system, multi-disciplinary team approach
embodying coordination, collaboration focusing on communities and person-centred
practice. The new way of working was found to have reduced barriers and with simplified
recording sufficient to meet legislative needs. It was found that early links with the
community and voluntary sector was important for quality outcomes and supporting people
with better lives. The quality of engagement with people was strong and there was reduced
need to access services for longer term supports. 
Ongoing development work through the First Point of Contact Group is considering how to
scale the learning from the innovation site and addressing how to bridge the gap between
the voluntary and statutory services, creating trusted pathways. 
Making Life Easier  
Making Life Easier (MLE) is an online resource offering information, professional advice and
direct access to support and services for all residents of North Lanarkshire.   
Making Life Easier gives people the tools to look after their own health and wellbeing. It allows
earlier interventions for people and prevents deterioration. The system has reduced waiting
lists for Occupational Therapy services with the consequent increase in capacity allowing for
services to be directed to the people that need them most.   
Making Life Easier supports the national policy shift in Scotland to give people the tools to
help them to stay well, live independently, promote their social engagement, live active and
healthy lives and can, where possible, self-manage. 
In the year 2021/2022  8,089 people in North Lanarkshire used MLE, a 24.9 % increase on
the previous year and an increase of 63% increase on the 2019 usage. Of these users, 86.7%
were new visitors and 1,102 people completed a self-assessment. 
Figures show through the Covid 19 pandemic, Making Life Easier remained a reliable source
of information, advice, and support for the people of North Lanarkshire with users
increasing year on year.    
Technology in Health and Social Care 
We continue to invest in the implementation of technology enable care and have
established a dedicated Technology Team within Health and Social Care which provides
support and guidance on the implementation of technology, through the development of
standards, processes and training.  A key focus is on embedding technology into the
Page 143 of 253

Page 144

29 
assessment, planning and implementation of care to provide service users further choice in
how care can be provided. 
The ‘tech flat’ within North Lanarkshire has been set up to demonstrate technology in situ
to professionals as well as those who use services and their carers’. Having closed during
2020/21 due to pandemic restrictions it has now reopened and continues to be a well-used
resource with around 60 visitors per month. The flat supports consideration of the use of
technology within support plans for individuals and continues to be upgraded with new and
innovative technology, something that the team will be looking to further evolve. 
We also continue to be involved in shaping the NHS Lanarkshire Digital Strategy to ensure a
person-centred focus is maintained is this fast-developing area of practice. Work has been
carried out alongside our NHS partners in developing guidance around the use of technology
within rehabilitation.    The team has also had involvement in shaping national policy and
learning around TEC, telecare and the analogue to digital transition through partnerships
with the Digital Office for Local Government, NSS TEC and the Scottish Government. 
The analogue to digital telecare transition is a major change project with considerable
associated challenges for our Community Alarm Service through the transition. This
continues to be progressed through the technology team with the aim to conclude with a
fully digital community alarm and telecare service by the end of 2025. 
Locality Support Services 
The Locality Support Services (LSS), registered with the Care Inspectorate, offer self-directed
support to adults with disabilities and /or long-term health conditions.  Support is flexible
over seven days and evenings connecting people with their local communities and interests. 
The service takes a human-rights and asset-based approach, promoting independence and
personal responsibility, supporting people to consider their natural connections, friendships
and paid support where it is required to achieve positive individual outcomes and better
lives. 
The locality support service adapted its delivery model throughout the pandemic and into
recovery, offering a blended service of direct support and online/distant support to the
people and their families and where required making use of a temp variation to registration
to offer support and care in and from people’s homes. Some service users have opted to
continue having support on-line and benefit from our broader portfolio of communication
methods. Some young people have been particularly enthusiastic about using technology to
communicate including a preference for using this for reviews rather than traditional
building-based meetings although limits on organisational access to social media platforms
can be an issue. 
The pandemic has also necessitated a more place-based approach changing the needs
profile of people being referred into locality support services, with more people requiring
support who have mental ill health, self-neglect and addictions as their main issue.  This has
highlighted new training needs with steps taken to source development opportunities for
workers.  
Page 144 of 253

Page 145

30 
The service is also very conscious of the wider health inequalities which often impact on
those with disabilities and long-term conditions and continue as core practice to support
people to identify at least one health outcome and to promote general healthy lives. This is
underpinned by an approach which places value on developing a progressive assessment
process, communicating well and working with partners will improve access to health and
other services. 
Integrated Day Services 
Integrated Day Services for Older Adults have continued to work with an aim to support
people with complex support needs to continue to live in their own homes safely, often
preventing admissions to hospital.  During the initial period of the pandemic the service
changed its delivery model in line with restrictions to work on an outreach basis however the
have now returned to working as a building-based service implementing a recovery plan
whilst adapting to the increased pressures across health and social care services.   This has
temporarily reduced the availability of some on-site interventions from health professionals
however operational arrangements will continued be reviewed as full recovery of the service
is progressed. 
Support at Home 
North Lanarkshire has, for many years, had a positive balance of care, which means that the
considerable investment in community-based supports over time has resulted in a high
proportion of people with long-term and complex needs being able to continue to live in
their own homes. 
The metric used for benchmarking across Scottish Health & Social Care Partnerships and
reported in the Annual Performance Reports (APRs) reflects very positively the long-term
efforts in North Lanarkshire to create and sustain the range of supports which minimise long
term residential, nursing or hospital care. 
In Adult Services, support at home is offered through internal home support, independent
sector provision and direct payment. 
Home Assessment Team 
To complement existing measures around Planned Date of Discharge (PDD), Discharge to
Assess (D2A) and Discharge without Delay (DwD) a multi-disciplinary Home Assessment
Team has been established with the aim of supporting people to be cared for at home (or as
close to home as possible), preventing avoidable admissions to hospital and, where hospital
admission is necessary, supporting timely discharge.  During 1st April 2021 and 31 March
2022 the referral rates demonstrate the pressure on Home Support with 73.1% of referrals
coming from the hospital. 
The Home Assessment Team (HAT) soft launch took place in Wishaw in late April taking
referrals from University Hospital Wishaw/ Monklands and in August the Cumbernauld soft
Page 145 of 253

Page 146

31 
launch was implemented taking referrals from UH Monklands/Wishaw with plans now
underway to accelerate full implementation at UHW. 
HAT work collaboratively with hospital discharge hubs and clinical teams to support timely
discharge from hospital to enable an assessment of each person’s immediate and longer-
term needs in their own home. This can include anything from signposting to support from a
statutory service and community care assessment. 
The Home Assessment Team has a multi-disciplinary approach to person centred care and
consists of Home Support staff, AHP’s, Clinical Responders and Social Work staff facilitating
‘Home First’ principles enabling people to be supported to return home for a period of
assessment.  This also reduces the pressures associated with having to make life-changing
decisions around longer-term care from a hospital setting.  The initial implementation stage
has demonstrated multiple benefits in supporting early intervention, reducing
deconditioning, supporting and maintaining independence though better tailored support,
reducing also the ‘over-prescribing’ of support and levels of ongoing care required from the
home support service. 
Home Support Service 
The Home Support Services supports up to 3,000 people at home in any one day (over 5,500
people over the year), providing over 22.5k hours of support each week. 74% of home
support service is provided by in house services, the remainder provided by the
independent sector. 
However, maintaining responsive, high-quality support at home for those who require this
has presented as substantial challenge over the past year due to significant workforce and
demand pressures within the sector, a pattern which has been common across the country.
An underlying increase in the level of need and national and local drive to relieve pressure
on acute health services are significant factors and  within home support resource has been
drawn to the high level of referrals from hospitals impacting also on the responsiveness to
emerging need within the community,  As reflected above the HSCP have continued to focus
on early intervention and prevention and the delivery of person-centred care through self-
directed support with the introduction of the  HAT team, described above, designed to
improve the experience and outcomes for individuals, in particular on their pathway from
hospital, as well as improving allocation of home support resource to those who need
ongoing support.   
As noted in previous CSWO reports immediately prior to the pandemic plans were put in
place for a redesign of the service with the centralisation management and support
functions and new roles to maximise the capacity and quality of the service, to embed
reablement and to support a move away from a time and task model to more personalised
self-directed support for those with more stable longer-term needs.  The pandemic, wider
demand and system changes have required these plans to be adapted.  There has since
been considerable work to implement a new structure within Home Support Service to
ensure that assessment and planning through reablement is re-introduced and that the
Page 146 of 253

Page 147

32 
wider options for independent living can be developed. A Home Support Redesign
programme has been established to progress the implementation to improve pathways and
service user experience, and address workforce challenges to maximise capacity and
responsiveness.  Additional resource has been invested in the service supported through
partnership and new Scottish Government funding, with additional management and
administrative support put in place, alongside the additional recruitment of 140 frontline
home support workers based in Home Assessment Team and Home Support Service. The
service now employs approximately 950 FTE Home Support Workers.   
A reassessment of the implementation to inform further redesign is taking place to allow
the service to reflect and review changes to meet current and new priorities.  This includes
our Out of Hours Service to address call waiting times for both staff and service users. To
ensure the delivery of a safe and high-quality service to support positive outcomes,
consultation with staff, service users and their carers and stakeholders will inform the
continued redesign of the service. The key areas that will be addressed to include;   
1. Recruitment and retention of Home Support Workers, administration and
Management 
2. Training, to ensure staff are competent and confident across all aspects of Home
Support provision
3. Roles: evaluating the hard-to-recruit posts
4. Quality of care and support being providd 
5. Efficiency/ scheduling
6. Increased demand needs to be managed through efficient pathways
Recruitment and retention to posts at all grades has been challenging and there has been a
higher than usual turnover. In addition to Home Support Worker roles, Support Officer and
Service Delivery Coordinators are difficult to recruit and retain. These new roles were
introduced just prior to the pandemic, and it was not possible to establish them fully due to
changes in working arrangements and the difficulties of delivering training during this period,
contributing to staff feedback suggesting the posts are too challenging. The tasks and skill sets
required for a number of posts, including administration and management roles which are
critical to supporting our staff will therefore be reviewed as part of our planned work. 
In the interim the rolling recruitment of Home Support Workers continues in order to meet
demand, with plans now in place to ensure all learning and development requirements are
informed by a fully inclusive development plan and robust curriculum to support key
priorities. 
A further key element of the planned redesign of Home Support was the development and
implementation of a dynamic scheduling tool both to benefit home support workforce in
the field and for those who schedule and plan work.  Initial development work has been
undertaken but identified a number of design complexities however this will be taken
forward as a priority given its criticality to service efficiency and improvement. 
In response to the challenges outlined the service has been working closely with colleagues
from the Care Inspectorate, both strategically in relation to service improvement as well as
operationally at local level. 
Page 147 of 253

Page 148

33 
Promoting choice through Self-Directed Support 
Transformational SDS Agenda
Our transformational SDS agenda has an emphasis on building greater community capacity
to support earlier preventative approaches and proactive planning alongside the continued
use of individual budgets for those with substantial and ongoing need. Two new temporary
Service Manager posts have been created to further develop and shape our strategy around
Self Directed Support across the Partnership supported by two resource worker posts. 
These posts are part funded through Scottish Government monies to enhance SDS.  
Key priorities include enhancing partnership working across the spectrum of community
solutions, universal services, third and voluntary sectors and statutory sector, linking also
with the Tec team on assistive technology so that people can be supported at home as
independently as possible, for as long as is appropriate, whilst minimising risk and reducing
reliance on statutory services. 
SDS Budgets
The number of people receiving an individual budget within the 21/22 year was 1520. The
graph below shows the number of individual budgets per locality.  This numbers reflect all
people receiving funding via an SDS budget across children, adults, and carers. 
There are currently 148 individuals who have an individual budget to provide 24-hour
support. Part of the transformational work going forward will be around robust reviews of
these support arrangements considering the potential use of technology enabled care
solutions where these are appropriate to support better lives and increased independence. 
Page 148 of 253

Page 149

34 
In the year 21/22 year we had a total of 317 Direct Payments (Option 1) and as with SDS
budgets overall these figures include all children, adults and carers. 
To support the increase in people choosing a Direct Payment arrangement, and the
anticipated need going forward a new DP support service was specified and procured.  
As of October 2021, Take Control North Lanarkshire commenced work in North Lanarkshire
replacing SPAEN.  Take Control NL are part of the well-established user led organisation
Glasgow Centre for Inclusive Living (GCIL).  GCIL have a track record of effectively meeting
the needs of people wishing to employ their own support staff using a DP.   
23 21 18
39
17
30
0
5
10
15
20
25
30
35
40
45
Individuals receiving 24/7 Support per
Locality
Page 149 of 253

Page 150

35 
Community Living Change Fund/Coming Home Report
In line with Scottish Government recommendations made within the Coming Home
Implementation Report, and more recently the allocation to North Lanarkshire Health and
Social Care Partnership of £1,298,332 from the Community Living Change fund, over a
three-year period (2021-2024), a programme of work is being undertaken to support the
strategic objectives of: 
• Reducing delayed discharges of people with complex needs.
• Repatriating those people inappropriately placed outside of Scotland.
• Redesigning the way services are provided for people with complex needs. 
This initiative will build on the work already well established in North Lanarkshire and
evidenced through our balance of care data. A significant amount of work has been
undertaken to ensure people are supported at home in their local community.
North Lanarkshire has the highest proportion of people aged 18 and over with long term
needs who receive personal care at home in mainland Scotland and has the lowest
placement rate for all adults aged over 18 in Scotland, which is over 30% lower than the
Scottish average 
The addition investment will provide an opportunity to review the current situation post-
pandemic and compliment the national work being undertaken to develop a dynamic
discharge register. A multi-agency team lead by Health and Social Care Partnership was
proposed to be established and will identify individuals with Complex Care Needs who are
out of area or whose discharge is delayed and review and develop protocols to address this.
This will include robust planning arrangements across a widen number of agencies to reduce
the length of time people need to wait to be discharged.  
A key outcome is to establish a new register of individuals affected and the introduction of
an appropriate assessment tool which will facilitate review of all cases. From this individual
outcome plans will be developed to assist each person back home addressing and resolving
the key obstacles faced such as housing, funding, care equipment etc. 
For those individuals identified as being repatriated and following appropriate assessment
including risk assessments, planning will facilitate appropriate interventions to ensure
individuals can come home safely. Additional protocols will be developed to support
interactions with other authorities which may be involved in such areas. 
Statutory Interventions 
Mental Health Officers Service and Adults with Incapacity Act (Scotland) 2000 
Mental Health Officers (MHO) are social workers with a minimum of two years post
qualifying experience who have gained Mental Health Officer Award (MHO award) which is
a postgraduate certificate at SCQF level 11.  Statutory duties for MHO’s are set out in the
Adults with Incapacity (Scotland) Act, 2000; the Mental Health (Care and Treatment)
(Scotland) Act, 2003 [MHCTA]; the Criminal Justice (Scotland) Act, 1995; Criminal Justice
(Scotland) Act 2016 and the Adult Support and Protection (Scotland) Act, 2007. The
implications of emergent court judgements emphasising the significance of both the
Page 150 of 253

Page 151

36 
European Convention of Human Rights and the United Nations Convention on the Rights of
Persons with Disabilities in statutory decision making, combine to place heavy demands on
the current resource. Additionally, new duties for mental health officers were introduced in
the implementation of the Mental Health (Scotland) Act, 2015. 
The Chief Social Work Officer holds overall statutory responsibility for the governance and
the management of welfare guardianship orders that have been granted to the local
authority, and for overseeing the supervision of private guardians in their role and function
as welfare guardians.  The day-to-day management of these statutory responsibilities are
delegated to Mental Health Officers and Social Workers and overseen by managers within
adult social work. 
Adults with Incapacity Act (Scotland) 2000 
The above chart shows the monthly running total of private and local authority
welfare/financial guardianship orders held for individuals in North Lanarkshire over the
period April 2021 until March 2022. 
The total number of guardianship orders in place in the North Lanarkshire Council area at the
end of March 2022 was 986. This is a 1.6 % decrease from the period 2020-21. On 31 March
2022, the number of individuals on a guardianship order in Scotland overall was 17,101. The
North Lanarkshire total figure constitutes 5.8 % of the national total. 
The local authority has a statutory responsibility to provide supervision and support to all
Private Guardians and undertake reviews of how the powers are being used on a regular basis,
unless it is formally agreed that this is not required. In relation to local authority welfare
guardianship powers, these are also reviewed regularly either by a Designated Mental Health
Officer or Social Worker.  
Page 151 of 253

Page 152

37 
Within North Lanarkshire Council there are several private residential and nursing care homes
which offer accommodation for adults with complex care requirements. Local Authorities,
from across Scotland, place Adults in these establishments. number of these Adults require
the use of Mental Health, Adults with Incapacity and/or Adult Support and Protection
legislation to ensure lawful decision making and protection of human rights. The statutory
responsibility for undertaking statutory duties as relevant to individual residents is carried out
by North Lanarkshire Council staff.    During this period, as noted in section 2.5 below two
Large Scale Investigations were undertaken under Adult Protection processes with respect to
this type of establishment. The co-ordination of these investigations and associated statutory
activity, in liaison with home local authorities, to ensure individuals rights were safeguarded
and needs appropriately supported placed substantial additional demands on North
Lanarkshire MHO and social work resources. 
Over the period April 2021 to March 2022, 135 requests were received for Mental Health
Officer reports to accompany new guardianship applications. In comparison with the
previous year this shows a 5.5 Increase. Of these applications 77 were for renewals of
welfare guardianship orders, which is a 157 % Increase in renewal applications since the
previous year. It should be noted that the ‘stop the clock’ put in force by the Coronavirus
(Scotland) Act 2020 ended on 30th September 2021, therefore the increase in renewals this
year would be expected as a direct consequence of demand effectively being held over from
the previous year. 
Page 152 of 253

Page 153

38 
Younger Adults with intellectual disabilities and/or neurodevelopmental causes and older
Adults with cognitive impairment remain the main categories of diagnosis in respect of
guardianship applications granted between April 2021 and March 2022. 
Mental Health (Care and Treatment) Act 2003 and Mental Health (Scotland Act 2015 
Statutory interventions to safeguard and support individuals through mental health
legislation is noted in the table below. 
National trends for civil detentions under the Mental Health (Care and Treatment)
(Scotland) Act 2003 have continued to rise. In North Lanarkshire there has been a reduction
in the number of Emergency Detention Certificates (down 10%) and Short-Term Detention
Certificates (7.9%), whilst the number of Compulsory Treatment Orders has increased (22%)
since the previous year. The total number of supervised Forensic orders continues to
increase in North Lanarkshire Council. We continue to maintain a higher than the national
average rate of consent to Emergency Detention Certificates. This year, MHO’s have
however refused consent to 38 Short Term Detentions, which is 25 more than the previous
year. 
Quality Assurance, Continuous Improvement and involving Lived Experience 
North Lanarkshire Council recognise that, MHO involvement in the social work and care
management role of adults with complex needs in relation to decision making capacity
and/or experience severe and enduring mental health difficulties, can offers much better
outcomes for individuals as a result of the knowledge and skill base MHOs retain whilst
ensuing human rights are central to intervention. 
Page 153 of 253

Page 154

39 
Our plan is to promote quality assurance by gathering feedback from people with lived
experience who are involved in the service, in addition to continuing to work collaboratively
with partnership colleagues and other stakeholders. We are developing our links with
Integrated Addiction Services in recognition that many individuals we work with experience
mental health and addiction issues which require a whole systems approach. 
We are also introducing self-evaluation and auditing processes for statutory MHO reports
and have undertaken a trauma informed walk through of the service to ensure best practice
and continuous improvement. 
Service Recovery 
As discussed in last year’s report, the impact of the pandemic, required rapid development
of remote working and centralising processes across the MHO service. Whilst there has
been a return to face-to-face assessments, meetings and MHO forums we have also
continued to benefit from the flexibility remote ways of working can offer service users and
staff alike with MS TEAMS and ‘Near Me’ service.  The centralisation of key functions has
created many benefits to managing pressures across the service in relation to staffing,
workload and sharing knowledge and experience. A centralised priority allocation process is
now in place as a way of addressing the pressures across the service. 
Appropriate Adults Services 
In January 2020, Appropriate Adults (AA) Services across Scotland became a statutory
function via part implementation of the Criminal Justice (Scotland) Act 2016. This now
means that a statutory duty is placed upon Police Scotland to request an Appropriate Adult,
while the Council have a statutory duty to provide Appropriate Adult Services, and the
training of AA’s. The Care Inspectorate have the duty to assess the quality of AA Services.  
During 2021-22, national developments have continued to take place to assist with the
ongoing implementation of the national statutory framework e.g.  Scottish Government AA
Oversight Group, national training group, and the requirement to complete a service-based
questionnaire on North Lanarkshire AA Services, for the Care Inspectorate. The Council is
currently working in partnership with the Care Inspectorate and other partners to design a
self-evaluation model for ongoing quality assurance purposes for AA Services.  
Appropriate Adult Services in North Lanarkshire are currently fully operated, funded and
delivered through Social Work Services with 12 employees trained to perform AA roles
during business hours and SWES (Social Work Emergency Services) staff providing support
out of hours. In line with statutory guidance produced by Scottish Government, work is
underway to develop a local Appropriate Adult Oversight Group. This multi-agency group
will have responsibilities for policy and practice development in this area eg. recruitment,
training, confidentiality, health and safety and service complaints. 
Appropriate Adult referrals decreased by 23% (from 92 to 71) from the same time last year,
in line with other local authority areas who have also experienced reductions in referral
rates. This is being monitored by a National Oversight Group, Scottish Appropriate Adult
Page 154 of 253

Page 155

40 
Network and Police Scotland. While there was a decrease, there were increases in the
number of times AA’s are being asked to attend police stations (for the same offence) and
are spending an increased amount of time supporting vulnerable adults whilst there. As
Council employees perform the AA role in addition to professional social work roles, this
continues to contribute to resource pressures however an Appropriate Adult Development
Officer post has been agreed and funded through new monies following statutory
implementation and it is hoped to recruit to this shortly. 
2.5 Public Protection 
Whilst all public protection activity is undertaken in partnership, the social work service has
a lead role and associated statutory responsibilities, particularly with respect to adult and
child protection and the management of high-risk offenders.  The information below
provides an overview and analysis of that activity. 
Child Protection 
The number of children whose names were placed on the child protection register
decreased by 20% from 2020 to 2021, consistent with an emerging national trend during the
initial period of the pandemic.  Historically, proportionately fewer children’s names have
been placed on the children protection register in North Lanarkshire than the Scottish
average and this remains the case, although the gap is narrowing as illustrated below.   
Despite this decrease, 2021/22 saw a continuing trend of increased child protection activity
overall.  The table below illustrates an increase of 66% in child protection referrals over the
past 5 years but proportionality fewer children (a 33% decrease) being referred to a Child
Protection Case Conference.  This indicates that more children were referred into the child
protection system than was perhaps necessary.  The development in North Lanarkshire of
planning for the wellbeing of children through our Empowering Clusters, is designed, in part,
to address this, with local supports and services in place to respond to need at an early
stage.  These trends will be monitored.     
Page 155 of 253

Page 156

41 
Year
Number of Child
Protection Referrals
Number of referrals
that proceeded to
Case Conference
Percentage of
Investigations
Proceeding to
Case
Conference
Percentage
of
Conferences
resulting in
Registration 
2021/22 1714 229 30% 73%
2020/21 1482 261 31% 76%
2019/20 1617 339 42% 74%
2018/19 1150 329 51% 76%
2017/18 1030 340 49% 74%
Adult Support and Protection 
During 2021/22 North Lanarkshire Social Work Services, as part of Health and Social Care
North Lanarkshire, received 2434 ASP referrals, an increase of less than 1% compared to
2020/21 (from 2,426 to 2,434). This is the third consecutive year that an annual increase has
been measured. 
Police Scotland remain one of the highest referring agencies, submitting 16% (380) of all ASP
referrals received; this is a 39% decrease from last year (from 598 to 380).  In addition to the
380 ASP referrals made by Police Scotland, there were a total of 4,004 Police ‘Adult
Concern’ Reports received. Since the same reporting period last year there has been a 13%
increase in police ‘Adult Concern’ reports (from 3,552 to 4,004). This is the third year
running when significant increases have occurred; this work continues to generate
significant resource pressures. 
For the fourth year running, there was an increase in the number of referrals received from
NHS L personnel (from 426 to 473, up 11%). Referrals from Social Work Services staff
decreased by 10% (from 411 to 371).     
For this period, ASP referrals from Care Homes demonstrated a 9% increase (from 416 to
455). Information from inquiry and Investigation processes suggest possible causes of this
include, the increasing complexity of people placed in care homes, many of whom have
significant levels of cognitive impairment and/or dementia, and behaviour which requires
intensive support.   
Monitoring and support in this area is provided by colleagues in Quality Assurance and, in
line with the increased focus on Care Homes during the pandemic this area of activity has
also been monitored through regular review of ASP referrals for care homes and multi-
professional Care Home Oversight arrangements. 
Adults with mental health issues were represented in 35% (858) of the total ASP referrals
received, being the main primary user group referred. Referrals for this group have
decreased since the same time last year but remain high in overall percentage terms (from
939 to 858). This only reinforces the importance of key service developments such as
Distress Brief Intervention (DBI) and social work investment in delivering ASP training for
those organisations who deliver services at home to our most vulnerable service users. 
Page 156 of 253

Page 157

42 
ASP Investigations /Case Conferences and Statutory Orders/Functions
During 2021-22 there were 434 ASP Investigations carried out, a 18% conversion rate from
inquiry to investigation and a 16% increase from the previous year. 
There were 111 ASP Initial Case Conferences held; this measures a 29% decrease from last
year. Anecdotal information from localities suggest that some cases have moved from
investigation to case conference sooner in the process. 
For the period 2021/22, North Lanarkshire Council, as part of Health and Social Care North
Lanarkshire also sought and implemented thirteen ASP Protection orders, broken down as;
six Removal Orders, three Banning Orders and four temporary Banning Orders, all with
power of arrest. 
During the period from April 2021 to March 2022, two Large Scale Investigations (LSI) under
Adult Support and Protection (Scotland) Act 2007 (ASPA) were carried out at care homes.
Both investigations highlighted a lack of legal safeguarding for many adults in relation to
welfare and financial decision-making with necessary actions progressed to address this in
conjunction with the Care Inspectorate, placing authorities, providers, individuals and
families.  The nature of these investigations required dedicated staff teams to be set up for
a period to progress this and whilst this was critical in ensuring the effectiveness of
investigations and supporting actions, this did have an impact on staff resource for other
activity. 
MAPPA (Multi-Agency Public Protection Arrangements) 
In addition to their in public protection though the management of offenders, as described in
2.2 above, justice social work services have a key role in respect to MAPPA arrangements as
lead agency for offenders subject to statutory supervision.  As such the service works closely
with the council’s housing service and other responsible authorities including, Police Scotland,
NHS and the Scottish Prison Service to assess and manage the risk posed by sexual, violent
and other risk of serious harm offenders. 
As noted in 1.4 above whilst activity is operationally managed within relevant agencies.
multi-agency oversight and co-ordination is supported by a small pan-Lanarkshire team and
Strategic Oversight Group (SOG).  An annual MAPPA report provides information on the
ongoing local implementation of MAPPA arrangements, key priorities and activity statistics: 
MAPPA Annual Report 2022 | North Lanarkshire Council 
Of the 699 individuals in custody or in the community in Lanarkshire subject to MAPPA as of
31/3/22, 56% (394) were the responsibility of North Lanarkshire authorities. Overall, the
number of individuals managed under MAPPA have grown significantly since arrangements
were established 15 years ago however this increase has slowed in recent years.  In both
North Lanarkshire and pan-Lanarkshire there was again a small increase between 20/21 and
21/22 however as in other areas of the justice system it difficult to clearly separate underlying
trends from the impact of the pandemic on the justice system.   MAPPA related activity is
however a key aspect of justice social work workloads. 
Whilst the statutory activity above is categorised in distinct strands there is a clear interface
across the different areas of public protection requiring joint-working across both social work
Page 157 of 253

Page 158

43 
care groups and partnership arrangements.  There is for example an increasing number of
older individuals and those with substantial care needs who are managed under   MAPPA
requiring close working between adult and justice services and there is also a strong interface
with child protection whilst domestic abuse and violence against women may also link
strongly to wider public protection processes.  All social work staff are therefore expected
and trained to have core knowledge of of the range protection procedures and
responsibilities.  Statutory public protection interventions and processes are also part of a
wider continuum of safeguarding and community safety activity in which social workers are
involved, some of which are reflected in earlier sections of this report.  Additional examples
of key priority areas for social work and partners where practice is evolving and innovating to
strengthen the protection and wellbeing of our communities are set out below: 
Contextual Safeguarding and Missing Young People 
Contextual Safeguarding is an approach to protecting young people who are at risk of extra
familial abuse (harm outside of the home), such as criminal or sexual abuse or violence
within peer groups.  North Lanarkshire is one of the first local authorities in Scotland to
adopt this approach and a multiagency steering group was established in 2021 and an audit
of practice comprising a review of processes and consultation with staff was completed. In
addition, the Promise Development Team with the support of Who Cares Scotland provision
in North Lanarkshire, held consultations and engagement with young people in relation to
their experience of service responses to risk of harm outside the family.  To ensure
interventions and resources are put in place to reduce risks in contexts, a Young Person’s
Safeguarding Panel was established in November 2021. It has representation from across
council services (CLD, education, community safety, housing) as well as from partners to
ensure a holistic response.  The panel considers young people at significant risk of harm
outside the home and is co-chaired by Police Scotland and Social Work and with each panel
there has been a complex mix of risks. Risks are discussed alongside strengths, and there is a
clear focus on the young person/people’s wellbeing.   The panel adds value to case planning
with young people by agreeing actions to address risks in locations or contexts for young
people. 
There continued to be a weekly Missing Persons’ meeting that discussed all young people
who were reported to the Police as being missing from the community or a residential
home.  The missing person meeting notes any risks to the child or young person when they
were missing for further action and support and monitors the outcome of this.  A
comparison of those young people reported as missing in 2021/22 with the previous year
shows a decrease in the number of total missing episodes (603 as opposed to 663) but an
increase in the number of individual young people reported as missing (287 as opposed to
185). As a result of ongoing work with children’s house staff in their approach to nurturing
and supporting young people, there was a significant reduction in young people reported
missing from North Lanarkshire’s children’s houses as illustrated below. In 2020/21 nearly
half the missing episodes related to care experienced young people missing from children’s
houses whereas this reduced to a quarter in 2021/22.  However, it also reflects an increase
in young people missing from their own families, 65% of whom were not known to the
social work service at the point of being reported missing.   
Page 158 of 253

Page 159

44 
20/21 21/22 
All young people reported as missing continued to be offered a Return Discussion from a
contracted service through Barnardo’s Scotland. This enabled young people to raise any
issue that may be affecting them with an independent person rather than a parent, police
officer, teacher or social worker. This led to a number of young people being referred onto
additional supports and the disclosure of harm that would not necessarily have occurred if
this independent service had not been available. 
All young people reported as missing continued to be offered a Return Discussion from a
contracted service through Barnardo’s Scotland. This enabled young people to raise any
issue that may be affecting them with an independent person rather than a parent, police
officer, teacher or social worker. This led to a number of young people being referred onto
additional supports and the disclosure of harm that would not necessarily have occurred if
this independent service had not been available.   
Suicide Prevention 
The Suicide Prevention Partnership Group is a collective of multi-agency staff which
aims to collaborate in the promotion of the national and local suicide prevention
strategies. This takes place via a range of activities including awareness raising and
training across services and local communities. 
The process of gathering data on suicide locally has developed since the winter of 2019.
More comprehensive information is now available from Police Scotland; which includes
more contextual information about the deceased person’s life, employment and
relationships.  This information support the targeting of prevention activity. 
As noted in the table below from 2018 until 31st December 2021, North Lanarkshire has
lost 171 people to completed suicides. There continues to be an increase in deaths of
younger people under the age of 39: these have mostly been young males.  Suicide
rates did not significantly vary throughout the lockdown period (2020/2021) however as
we continue to recover from the emotional and fiscal effects of the pandemic there is a
Page 159 of 253

Page 160

45 
concern that the cost-of-living crisis may impact an increasing number of individuals
mental health and wellbeing with an associated risk of a rise in suicide rates.  In this
context continuing to review and enhance the local action plan is clearly essential 
(taken from National Records of Scotland suicide data for North Lanarkshire on an annual basis from
2018 until 2021)
YEAR Completed number of suicides in NLC
2018 58
2019 57
2020 62
2021 52
Up to 31 March 2022 13 
The local action plan delivered by the Suicide Prevention Partnership Group is framed
around the following aims:
1.       Reducing the risk of suicide in high-risk groups.
2.       Tailoring approaches to improve mental and physical health in specific groups.
3.       Reducing access to means of suicide, including identified Locations of Concern
4.       Learning from investigations and reviews into unexpected deaths.
5.       Providing better information and support to those bereaved or affected by
suicide.
6.       Supporting research, data collection and monitoring.
7.       Building community capacity to help reduce the stigma and taboo associated with
suicide. 
There is extensive peer support available across the authority with suicide awareness
and prevention training being delivered across health, education, third sector and
voluntary organisations.  The partnership now embedded participation, initially as a
pilot area in rolling out Distress Brief Intervention is also supportive of this work. 
A Senior Officer Adult Service Leads on the Suicide Prevention work. A proposal is being
progressed to recruit a Suicide review Officer pan Lanarkshire, initially on a temporary
basis, to continue to take forward this important work. 
Drug Related Deaths
North Lanarkshire has some of highest levels of alcohol and drug related deaths in Scotland
with 94 people dying from drug-related causes in 2020. Of these, 68% were male and 32%
Female. Further analysis of the data shows 62% of all deaths in North 
Lanarkshire occurred in the 35 – 54 age group with 25- 34 olds and 45 and over age range
falling not far behind. 
Overall, 98% of DRDs were poly-drug deaths with 71% of deaths from drugs in 2020 having
more than 5 substances named in the toxicology reports*1. This represents a significant
challenge in understanding and responding to the needs of people who use drugs in North
Lanarkshire. 
Page 160 of 253

Page 161

46 
Measures associated with targeting drug related deaths locally and nationally have been
implemented via MAT Standards, Drug related Death task force workstreams and ADP
funded projects.
Actions will be centred on improving quality, offering choice and creating more
of the connections to keep people safe, well and thriving. Realising a North
Lanarkshire where:
1. Fewer people develop problem drug and alcohol use
2. People access and benefit from effective, integrated person-centred support to
achieve their own type of recovery
3. Children and families affected by alcohol and drug use will be safe, healthy,
included and supported.
4. Vulnerable people are diverted from the justice system wherever possible, and
those in the system are fully supported.
5. Less harm is caused by alcohol. 
3.  RESOURCES 
For financial year 2021/22 North Lanarkshire Council had gross annual social work budget,
inclusive of Covid & winter planning funding, in excess of £266m.  This was allocated as
£220m for Adult Social Care and £46m for Children, Families & Justice. The equivalent
funding for the previous financial year was £252m. 
The ongoing impact of Covid-19 resulted in spend in excess of £8M which included the costs
of PPE, the provision of additional home support hours and partner sustainability payments. 
This expenditure was fully funded by the Scottish Government. 
New recurring investment of £300m was announced by the Scottish Government at the end
of 2021 to protect health and social care services over the winter period and to provide
longer term improvement in service capacity across health and social care systems.  North
Lanarkshire’s share of this funding was £6.4m and a full business case was approved on how
Page 161 of 253

Page 162

47 
this would be utilised over the forthcoming 12-month period:
https://mars.northlanarkshire.gov.uk/egenda/images/att97950.pdf 
There are however ongoing difficulties across the sector in recruiting for the required posts
delaying spend against these funds.   
In aggregate Social Work had a savings target of £1.768M, 78% of which was achieved
during the year. Plans are in place to fully achieve the savings in future years. 
Whilst the totality of Social Work activity during 2021/22 was undertaken within the overall
budget resource and resulted in an underspend position this outturn underspend is
projected to be on a non-recurring basis and therefore financial pressures are expected in
specific areas as follows: - 
a. Home Support 
b. Independent Care Homes 
c. Self-Directed Services 
d. Integrated Equipment and Adaptation Service
e. Family Placements 
f. Children’s Houses 
The underspend in Children’s Services Social Work was mainly due to savings in employee
costs, which were largely as a result of recruitment issues and savings in external payments
both to individuals and external agencies.  There remain however significant ongoing cost
pressures particularly in relation to placements costs which were alleviated by temporary
additional funding allocated by the council which ended in 2021/22.  Pressures relate
primarily to growth in placements and costs within kinship care and external fostering. 
There are also ongoing cost pressures in relation to the management of internal Children’s
Houses and the rise in costs for external residential placements, although as noted
previously there has been a reduction in the use of external residential resource over recent
years.   Previous pressures with respect to continuing care costs have been mitigated by the
additional recurring local investment in this area of service. 
Within the Justice budget the Scottish Government allocated additional funds to all 32
authorities to support the Justice recovery from the pandemic. North Lanarkshire received
£0.943m of which £0.164m was earmarked specifically for the Third Sector.  NLC were able
to utilise £0.632 in year which included the full utilisation of the Third Sector monies.  The
main obstacle to fully spending the additional funds was in relation to recruiting to temporary
posts.  This was exacerbated by the relatively late confirmation of this funding which meant
an automatic lag in recruitment as a direct consequence. 
In view of demand pressures and the criticality of frontline social work provision to both the
delivery of statutory responsibilities and wider national and local policy ambitions the
council and HSCP have taken no savings from main grade social worker posts over this
period or recent years however wider savings have impacted within the service and the
overall financial climate clearly remains challenging. 
Page 162 of 253

Page 163

48 
Additional national funding for adult health and social care, of which local spend is reflected
in the business case link above, has supported address some pressure points in Adult
Services, however as noted elsewhere in this report recruitment challenges remain.  Further
recurring national investment in Adult Social Work from 2022/23, equating to 1.278m for
North Lanarkshire announced in early 2022 is also welcome.  Additional funding for Justice
Social Work Services to support address the pandemic related backlog in demand will also
continue into 2022/23 however the position beyond this is unclear.  In contrast there has
been no earmarked national investment in Children’s Social Work Services beyond the
short- term winter support plan monies allocated at the end of 2020 with the impact that a
number of the developments reflected in section 2.3 above have been supported by a range
of short-term or non-recurring partnership funding and are therefore vulnerable to any
changes within this. 
Financial Modelling for Service Delivery 
Financial Planning and monitoring continue to be a key responsibility for the management
team.  The Council’s financial strategy includes Service input to four key processes.  These
are:
a. Preparation of detailed single year budget 
b. In–year budget monitoring and projections 
c.  Preparation of rolling 3-year budgets 
d. Preparation of a Medium-Term Financial Plan 
Alongside these the Council Finance Team work closely with the IJB Chief Finance Officer to
prepare a medium-term financial plan for the Health and Social Care Partnership.   
In terms of financial modelling the Management Team increasingly take a whole systems
approach to delivering new and more efficient operating models which often requires joint
working with other Council services and key external partners. 
The Management Team have also had to undertake significant work to prepare projections,
plans and models which estimate the operational and cost impact of Covid on service
delivery. This information is shared with officers in the Council, IJB key external partners and
with the Scottish Government. 
In addition to the wider financial modelling described above work has also been undertaken
to support the business plan for Adult Health and Social Care.  With respect to Children’s
Services the council and local partnership is one of three areas who have committed to
working with the Promise team nationally on ‘Human and Economic Cost Modelling’, work
which is intended to support longer term change both nationally and locally by identifying
how money is currently spent and the system changes required to move the balance of
spend toward early intervention and family support in line with the aspirations of Christie. 
Page 163 of 253

Page 164

49 
4.  WORKFORCE 
4.1 Workforce Planning 
Workforce planning within social work is integrated thought the social workforce group but
informed by the Council’s corporate ‘Workforce for the Future Strategy’,
https://mars.northlanarkshire.gov.uk/egenda/images/att96241.pdf  which was updated and
approved in June 2021 and interfaces also with the wider HSCP workplan. 
As reflected in other parts of this report the direct and indirect impacts of the pandemic and
cost of living crisis along with underlying demand pressures have significantly impacted on
the ask of the social work workforce over this period.  Changes in the labour market as the
country moves into the recovery phase have also impacted on recruitment and retention of
staff and have together exposed some of the underlying vulnerabilities with respect to the
capacity, valuing and development of the social work and social care workforce.   North
Lanarkshire is not immune to these challenges and whilst many of these also require action
at national level, there is substantial work ongoing locally to address key issues and support
workforce resilience. 
Social Worker Recruitment and Retention 
The service has previously adopted a mixed model with respect to social worker recruitment
bur in response to financial constraints the services’ internal social worker trainee
programme was paused in 2018/19 and since this time social worker recruitment has been
predominantly external.   Whilst staff turnover in many areas was supressed during the
initial stages of the pandemic this has increased over the last 18 months.  This is in part due
to more internal movement to promoted, developmental and specialist posts within all care
groups, including those created through service redesign and temporary funding streams,
with such opportunities also supporting positive career pathways and staff retention.  There
has also been movement across care groups due to the creation of additional posts in justice
and adult services with some ‘churn’ emerging particularly in children and families alongside
an emerging increase in movement to other local authorities, in particular Glasgow where
pay rates for main grade social work staff are higher.  This is in a context of national
recruitment challenges for social work with no overarching-system of
bursaries/employment whilst training as well as increased demand for staff and the
disruptive impact of the pandemic on social worker qualifying training.   
Whilst North Lanarkshire continues to successfully recruit including attracting students who
have has positive placement experiences with the authority, this has also impacted on
experience levels and stability at the frontline, for example in Children, Families and Justice
alone 36 external appointments were made to the role of social worker over this period, 29
of whom were newly qualified.  Whilst these staff bring skills, creativity and commitment to
the service, the impact of the pandemic on pre-qualifying opportunities has impacted on
learning needs and the changing balance between newly qualified and more experienced
workers, alongside an increasing complexity in the demand profile, has created clear
pressures with respect to the allocation of work within localities with a requirement to
provide more support across teams.
Page 164 of 253

Page 165

50 
Frontline managers continue to monitor caseloads and assist their workers in the
prioritisation of their statutory responsibilities.  In Justice Social Work a revised structure
has allowed for a more flexible approach to the deployment of staff across the authority to
support the teams who are dealing with the most urgent and pressing demands and
authority wide teams continue to support localities across all care groups. Whilst not
favoured as a core element of our ongoing workforce strategy, where necessary limited use
of agency social workers has also been employed under the auspices of Covid-19 recovery
monies in Adult and Justice services. 
There is a productive partnership approach between the service and our HR colleagues in
terms of ongoing recruitment strategies.  Advertising frequency and dates have been
reviewed to streamline the process and quicken the employee onboarding experience to
and the service also maximises opportunities to recruit on a permanent basis (temp
location) against temporary vacancies on the basis that normal levels of turnover mitigate
any associated. financial risk. 
As outlined in 4.2 below, a commitment to capacity to support Practice Learning, the new
Supported Year in Practice and to both Continuous Professional Development and Health
and Wellbeing Support are all critical to longer-term recruitment and retention strategies
but in the current context and it is likely that supporting actions will need to continue to be
updated and reviewed. 
Our Senior Practitioner Scheme continues to contribute to retention and the building of a
skilled workforce.  It allows social workers and occupational therapists to progress to an
enhanced salary scale on completion of relevant post qualifying training and commitment to
undertake additional responsibilities and remains a key component of our model, with over
60 practitioners within the service carrying the status alongside tailored work plans
identifying their additional contribution to the service.    The Senior Practitioner qualification
has been extended to include the Diploma in Autism and the National Joint Investigative
Programme Training and new social workers who meet the criteria have immediate access
to temporary Senior Practitioner status, pending a process to confirm status.   
Our strong commitment to the provision of Practice Learning as part of Learning Network
West has been maintained and despite some of the challenges involved in providing quality
learning experiences in the context of hybrid working, we have by the end of 2021/22 been
able to restore placement provision to pre-pandemic levels.  The service has benefitted
significantly from the input of the students and as noted above this also supports
recruitment.  Following a ‘test of change’ in autumn 2021 provision of opportunities through
traditional dispersed placements has been supplemented by the development of two
student hubs base in the north and south of the authority.  Each hub has the capacity to
support around 9 students with a co-located practice teacher and with all placement
opportunities overseen by a dedicated Senior Officer in our Training and Organisational
Development team.  Our experience to date suggests this model is highly valued by students
whilst also providing flexibility of deployment to support service needs. 
Page 165 of 253

Page 166

51 
Recruitment and retention of Mental Health Officers 
North Lanarkshire Council remain committed to training social workers to become MHO’s
and since 2018 have successfully supported nine individuals through their MHO award. An
MHO Traineeship Scheme was introduced during the pandemic, ensuring the MHO Trainees
are located within the MHO Service during the course. We received positive feedback from
the Trainees that being based within the service, provided quality learning and practice
opportunities, despite a significant reduction in face-to-face contact with colleagues and
service users.  The scheme will continue, and a self-evaluation process is currently being
undertaken. Colleagues across Education and Families and Social Work Emergency Services
have shown an interest in being considered for the Award. 
Mental Health Officer forums continue every 6 weeks, offering discussion on practice issues,
case studies, national reports/guidance and providing feedback to Scottish Mental Health
Law Review. 
North Lanarkshire continue to offer MHO’s the opportunity to obtain, and maintain, Senior
Practitioner status and to share their knowledge and experience with MHO and social work
colleagues in relation to various aspects of AWI and MH legislation as well as Self Directed
Support. 
We recognise the breadth of knowledge, experience, and skill across the MHO service and
plan to restart consultation sessions regarding human rights, AWI and MH Act as well as
establishing MHO champions who have areas of practice interest, in relation to
neurodiversity, forensic work, and complex trauma. 
Remote external training and development opportunities continue to be available to MHO’s,
for example via the Scottish Forensic Network, Mental Welfare Commission and MHO
community of practice (SASW). 
Despite these measures in common with other local authorities, North Lanarkshire
continues to be under-resourced in this area and this poses a considerable challenge for
responding to statutory duties and timelines. Recruitment, retention and succession
planning for MHOs are high level priorities and are under constant review.  The service has
recently been augmented by three newly qualified Mental Health Officers and an
experienced MHO from another social work team. We also continue to have a core group of
sessional MHOs who are involved in supporting AWI processes to support adults assessed as
lacking capacity for making decisions with respect to hospital discharge processes this is
proven to be beneficial and will continue to be funded. Grant aided funding from the
Scottish Government to support Mental Health Officer training, is supporting the
recruitment of a stand-alone Practice Assessor with we anticipate the post be filled by
September 2022.  We are also in the process of recruiting social worker posts to be based in
the Mental Health Officer Service and an additional Mental Health Officer post for complex
discharge planning is also currently under development. 
Page 166 of 253

Page 167

52 
Social Care 
As reflected in Section 2.4 above there remain significant recruitment, retention and
capacity challenges with respect to the home support workforce and whilst recruitment
planning for the in-house service has always had to be balanced to avoid a simple transfer of
capacity from the local independent sector the need to retain critical service delivery has
necessitated an upscaling of recruitment to our in-house service over the last year. 
Challenges in recruitment and retention in this sector are not confined to the roles of home
support workers providing direct care but also to management and support functions, as
reflected earlier in this report, requiring further review of roles, the creation of additional
posts and ongoing consideration of support arrangements to aid retention.  Other areas in
which there are recruitment challenges include locality support services and some roles
within residential childcare, significant factors being wider labour market changes and
comparative pay.  In addition to wider strategic actions, service areas are themselves active
in seeking solutions, for example, locality support services have continued to build links with
education, encourage apprenticeship schemes and promote the idea to young people that a
career in social care is rewarding and full of possibilities for promotion, further education
and development.  A group has been set up with a focus on promoting succession planning
and preparedness of workers interested in promotion, staff development and the
introduction of the principles of creating a working environment that is trauma informed 
Administration/Business Support 
Administrative and support staff within social work play an invaluable role in supporting
service delivery and increasing challenges with respect to recruitment and retention in
respect of key administrative and support roles have over the past year also impacted
significantly on the service with high vacancy and turnover rates particularly in main grade
roles with loss of staff to other services in the local authority, the health service and private
sector an issue, again with comparative pay issues a significant factor.  A wider review of
administrative support across the wider education and families and social work service is
planned with an ambition that a redesigned business support model will support efficiency
and offer roles which both reflect the specific needs of the current service and which are
more attractive and offer improved career pathways for staff. 
Care Academy 
A important vehicle to support workforce planning in social work and a key element of
Workforce for the Future is the Health & Social Care Academy a much long-standing piece
of work, with mature partnership model and based on a key joint venture with NHS
Lanarkshire. Recently, existing work has been deepened by establishing 3 priority sub-
groups focused on 1) the young workforce, with further development of the in school
vocational offering for Health and Social Care; 2) adult recruitment and employability,
with a focus on both short- and longer-term workforce demands in the sector, 3) building
capacity and resilience by supporting wellbeing, training, and development across the
existing workforce. A clear plan of action has been developed for each of the subgroups
who will take forward this work in the next 6 to 12 months with regular reporting to the
Workforce for the Future Steering Group. Work will also be taken forward in the next
Page 167 of 253

Page 168

53 
phase to develop a framework of outcome measures which can be used to track the
overall progress of the programme and its impact. 
4.2 Workforce Development and Staff Support 
There are a wide range of learning and development opportunities open to staff supported
and planned both corporately and at service, team and individual levels with a focus on
alignment to service and corporate ambitions and redesign but also on more specific team
and individual development needs the latter through our PRD processes.   
Prior to the pandemic the council invested in LearnNL a cloud-based learning management
system designed to support a more inclusive and accessible approach to learning whilst
improving digital literacy, and this was a key support in sustaining training and development
during the pandemic period during which more training was adapted for online delivery
however as the year has progressed there have been some opportunities to re-stablish face-
to-face team development, with the hope that wider opportunities will be available over the
coming year.   
A summary of key activity over the period with respect to Learn NL, Assessment Centre and
training activity to supporting registration and the social care workforce and Post-qualifying
Awards is noted below:   
LearnNL 
Total number of activities undertaken on LearnNL including mandatory learning – 10,718
Leadership Development – 87 activities
Fundamental Leadership – 2
Influential Leadership – 9 
Assessment Centre and Registration 
The Assessment Centre continues to support SVQ, and PDA qualifications required to meet
registration, role and CPD requirements.  This is achieved through both in house assessment
and access to SVQs through external providers.
The North Lanarkshire Assessment Centre was subject to an external verification visit in
August 2022.  A number of activities were undertaken in this visit to ensure we continue to
meet the requirements set out by SQA.  All areas sampled in the visit were rated green (High
Confidence) by the external verifier, an excellent achievement, sustaining high standards of
delivery throughout challenging times. 
Awards completed (2021 – present)
SCQF Level 6 (SVQ2) – 8
SCQF Level 7 (SVQ3) – 5 
SCQF Level 9 (SVQ4) – 2
PDA Level 9 – 4 
Page 168 of 253

Page 169

54 
Active Candidates – External Programmes (2021 – present)
New College Lanarkshire – 17  
West Lothian College – 4
A tender has recently been issued for the provision of SVQ Level 2 in Social Services in
Health Care which will provide up to 30 places over the next two years 
Active Candidates – Internal Programmes (2021 – present)
SCQF Level 7 (SVQ3) – 4
SCQF Level 9 (SVQ4) – 5
PDA Leadership and Care (SCQF Level 9) – 3 
Post Graduate Opportunities 
Advanced Practice skills – 1 completed 2022 
Postgraduate in Child Welfare and Protection @ Stirling University – 4 started in 2021 and
completed June 2022. A further 5 will commence September 2022 due to finish June 2023.
Postgraduate in Adult Support and Protection – 2
Postgraduate in Contemporary Drug and Alcohol Studies – 2
Part funding of final year of PHD qualification – 1
Postgraduate in Management and Leadership – 1
Exploring the Theory and Practice of Psychological Trauma – 1
MSc In Leading People Centred Care – 1
Children in Conflict with the law – 2 places funded for 2022 with a further 4 places funded
for 2023 
Professional development award in practice learning (PDA PL) 
Four social workers qualified as practice teachers this year with a further two due to finish
by December 2022.  This is supported by a practice learning pathway for social workers to
become link workers and practice teachers.  Over the past 4 years we have promoted
practice learning and successfully built a strong cohort of competent and confident link
workers and currently have waiting list to become a practice teacher. 
Social Worker Training 
Whilst our secondee scheme is currently suspended as noted above we continue to have
staff studying on their own time with the Open University which they self-fund. We have 6
support workers who are all at a stage they now only require to be sponsored by NLC for
their 2 practice placements to qualify as social workers. We have committed to this funding
and all 6 will start their first assessed placement February 2023 and will qualify September
2024. 
Newly Qualified Social Workers (NQSWs), Supported Year in Practice 
In view of the workforce profile describe in 4.1 above, the service has been delighted to
receive funding support for a Practice Learning Officer as and early implementer of a
supported year for NQSW’s.  Knowing that North Lanarkshire Council (NLC) is a part of the
Page 169 of 253

Page 170

55 
early implementation has also been a key factor for NQSW applying for posts in the local
authority. 
There are currently 21 NQSW who are registered with SSSC as part of the supported year
with others sue to join this group shortly whilst 4 NQSW who were employed by NLC prior
to the supported year starting are receiving support through Early Professional
Development Programme, training and development opportunities being shared and 1:1
support as required.  An initial face-to-face inductions day for NQSWs has taken place with
others to be scheduled as further staff join backed with a 12-session programme to runover
the year and engagement with line managers.  The CSWO and Head of Adult Social Work
met with NQSWs as part of their initial induction programme, and it is planned that further
‘touch in’ contact will take place in future induction days and later in the programme. 
Other key training and development: 
A broad range of other core training and development activity has continued including with
respect to Public Protection using online and blended models. For example, ASP Council
Officer Training (Day2) and investigative Interview Training (Day3) were reviewed and
redesigned to support remote delivery and were delivered to 30 staff during April and May
2021.  The Getting it Right in Child Protection blended course has run throughout the
pandemic ensuring that multi-agency staff are knowledgeable and confident within child
protection practice. 
A range of service specific and partnership training has supported key areas of
organisational, service and practice development described elsewhere in this report in a
number of instances using a ‘train the trainer’ model which is supporting the expansion in
the use of the Outcome Star as a tool from justice services across education and families and
plans to embed Safe and Together within Children’s Services 
Team based learning is also common across the service.  One example being locality support
services who developed an on-line platform using Yammer to share good practise and
develop a quality assurance space insuring services across the six localities were learning
from one another and providing quality services. Six weekly ‘best practice’ meetings have
been established locally to recognise and celebrate good stories, meeting one of the needs
expressed by workers in one of our feedback exercises. 
Trauma Informed Practice 
A key priority across the social work service is the embedding of trauma informed
approaches across both organisational systems and service delivery and to ensure an
appropriately skilled workforce in line with the National Trauma Training Plan.  Trauma
Informed Practice is already embedded in areas of training and service delivery, for
example, as integral to the Scottish Child Interview Model which forms the basis for the pan-
lanarkshire Joint Investigative Interviewing Team.  One of our childcare teams was involved
in the national piloting of social work specific training and trauma informed systems and
practice are also integral to our work on contextual safeguarding and the subject of a
research partnership with the Innovate national research project as well as to the work of
Page 170 of 253

Page 171

56 
the services’ health and wellbeing group.  Senior Social Work Managers are Trauma
Champions for the Council and HSCP respectively along with our Principal Educational
Psychologist, developing the local steering group and associated plan. 
Lived Experience 
As reflected elsewhere in this report the service has benefited significantly from the
increased involvement of those with lived experience in training and development activity
and from the opportunities created for targeted employment of those with lived
experience.  Further work is planned to ensure appropriate pathways are available both to
this type of role and others within the service and to ensure appropriate support is available
for staff with respect to these roles and future career development.  a number of 
Reflective Learning: The Scottish Child Abuse Inquiry/Historical Abuse 
Reflective learning remains central to continuous professional development and service
quality within social work and social care whether through 1-1 supervision or sharing
learning from case audits and reviews.  One area of focus over the past year has been local
learning from work undertaken with respect to the Scottish Abuse Inquiry which has also
dovetailed with work around the Promise.  Lead officers involved in supporting the inquiry
have prepared presentations around key learning which have been delivered to the social
work management team and to a range of children and families staff with further inputs
planned to adult services and the child protection committee.  This is also influencing
service improvement in areas as diverse as the planned review of our foster care handbook
and management of access to records requests. 
Support for Staff Wellbeing 
As reflected across this report demands on staff remain significant and whilst there has
been huge resilience within the workforce the level of demand alongside a significant
change agenda and the residual impacts of the pandemic are still impacting on the
wellbeing of many staff.  A range of specific supports have been made available but there is
also increasingly within the service a clear need to focus on the support staff need within
day-to-day practice and working arrangements to manage and thrive and this clearly links
with work around a trauma informed organisation.   
5.1 Looking Forward - Priorities for 2022/23 and beyond 
It is clear from the reflection on delivery of social work and social care contained in this
report that the context is likely to remain both complex and challenging over the coming
year as both the service and the communities we support continue to be impacted by the
legacy of the pandemic and the increasingly significant cost of living crisis.   There are clear
indications in the demand on all areas of the social work service during 2021/22 of a
significant increase in both the volume and complexity of need, which will not be simply
transitional, but will carry forward into 2022/23 and beyond, and that challenges in other
parts of the public sector, particularly with respect to acute health services, will also
continue to impact hugely.  
Page 171 of 253

Page 172

57 
In this context it is sometimes difficult to focus on the strong starting position within North
Lanarkshire with respect to our balance of care and the embedding of integrated working
across Health and Social Care, the Education and Families Service and the wider Council and
Partnership.  Whilst this position is likely to be tested by immediate demand pressures it is
important that these do not draw focus from a whole system approach and the
opportunities to further strengthen this, for example, through the embedding of the
Empowering Cluster’s model within Education and Families and of the 3 Conversations
Model in Adult Services.  Equally, whilst income maximisation and tackling poverty actions
have always been a feature of the delivery of social work and social care in North
Lanarkshire, it will be more important than ever that these are both broader and fully
integrated into day-to-day practice and service delivery given the challenges faced by those
we support and the close association between poverty, health inequalities and statutory
interventions across all social work care groups and the disproportionate experience of
poverty also impacting on unpaid carers. 
Workforce pressures and issues in social work and social care will require serious and
continued attention at both national and local level, both to reduce the risk to the delivery
of key statutory responsibilities and the quality of care and support, and to ensure capacity
for the continuous improvement and service redesign necessary to improve outcomes. 
Whilst digital developments will continue to be essential, and create opportunities for wider
engagement, as reflected at the start of this report, the visibility of senior managers and
opportunities for more informal engagement with staff have been compromised over the
last two years and a range of visits and events are planned for early 22/23 which will also
provide an important vehicle for staff to come together.  A continued focus on working to
build trauma informed systems and organisation as well as to strengthen practice in this
area will also be fundamental to creating a healthy service which supports staff to deliver
well for our communities 
In addition to the continued opportunities presented by digital and tech solutions within
service redesign and improvement, it is anticipated that the conclusion of a tender for a new
social work case management system will be completed early in 2022/23.  Whilst the
transition to this will be complex, take some time and require the support of a robust
implementation plan, a new system will be a key support to staff as well as improving
service user experience and the measurement of performance/impact.  Equally important,
for the home support service in particular, will be work to finally secure a strong dynamic
scheduling system. 
External scrutiny, specifically with respect to public protection is likely to feature for the
service in the coming year with some inspection programmes previously paused during the
pandemic.  An adult support and protection inspection is scheduled during the first part of
the year and there is the possibility also of an inspection of services to children and young
people at risk of harm in the relatively near future.  Whilst welcome this will require to be
factored into planning given the associated stretch on organisational resource
requirements.  Similarly, 2022/23 will be a year when significant work will be required
around strategic needs assessment and other preparatory work to support the the renewal
of key statutory plans due in 2023 including the HSCP’s Strategic Commissioning Plan and
Page 172 of 253

Page 173

58 
the Children’s Services and Community Justice Plan whilst the Council will also refresh its
Programme of Work. 
Undoubtedly the financial context for service delivery, as for the wider public sector, will
also remain challenging and its impact is exacerbated by the growth in demand across all
social work care groups.   Whilst, as reflected in the resources section of this report, there is
considerable focus on financial planning, there remain specific challenges around the short-
term nature of additional funding specifically in justice and children’s services and in
realising a route to support the aspiration to move a higher proportion of resource
upstream.  We will however continue to engage in work on this.  
The context for the delivery of social work services will also clearly continue to be impacted
by key national policy drivers including the Promise, the yet to be finalised incorporation of
UNRC into Scots Law, the Vision and Strategic Priorities for Justice, and perhaps most
significantly by the planning and legislative process for the proposed National Care Service
alongside a raft of additional national policy drivers and planned changes in guidance and
legislation.  Additionally wider and emerging demands on social work services include the
now mandatory National Transfer Scheme for Unaccompanied Asylum-Seeking Children
and, with the resettlement support needs arising from the tragic war in Ukraine.   
The overall the scale of change, some of it potentially significantly disruptive, alongside the
demand and workforce pressures likely for social work will undoubtedly continue to
challenge capacity and in moving forward there will be a need to maintain the benefits of
local best practice and partnership working whilst progressing the system transformation
required to address longstanding problems and to support better outcomes.  Continued
strong leadership will be required to avoid staff being overwhelmed and to balance
immediate pressures with respect to core service delivery, and the associated risk to those
we support, with the change and improvement capacity required for the scale of envisaged
over the coming years.  As noted in my report last year, and equally true a year on, 
‘Social work has the potential to play a key role in shaping system transformation nationally
and locally and in ensuring a focus on rights, inclusion and social justice however it is also
important that the complexities inherent in the social work task are recognised and that
context supports best practice’ 
Page 173 of 253

Page 174

Page 174 of 253

Page 175

North Lanarkshire Council
Report
Education, Children and Families Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref   Date 28/02/23 
Keeping the Promise: Care Experienced Children and Young
People 
From  Alison Gordon, Chief Social Work Officer (Education, Families, Justice and
Integrated Practice)  
E-mail GordonAl@northlan.gov.uk  Telephone 01698 332001 
Executive Summary 
The purpose of this report is to provide an update on the key developments to deliver the
Promise: Care Foundation to support care experienced children and young people. The
council’s commitment to improving outcomes for our care experienced children and young
people has been explicitly reflected in its endorsement of Keeping the Promise and is integral
to the Plan for North Lanarkshire’s aspiration to support all children and young people to
realise their full potential. 
Several reports to the previous Education and Families Committee, the most recent a report
on developments presented in September 2022, have updated members on the range of work
being progressed to improve the experience and outcomes for children and young people
experiencing, or who have experienced care in North Lanarkshire. This report updates further
on number of key areas including on how our Children’s Champions Board and Promise
Development Team are ensuring lived experience is central to the change process. The
critical role of support offered within our Children’s Houses is highlighted as is planned activity
to further enhance our Children’s Carer Service and the wide-ranging work of the virtual
school in improving educational opportunities, attainment, and wider outcomes. 
Recommendations 
It is recommended that the Education, Children and Families Committee: 
(1) Note the content of this report and the challenges and ambition of The Promise
and the Promise Plan 21- 24 within the context of North Lanarkshire
(2) Endorse the actions highlighted as next steps in section 2 of the report 
The Plan for North Lanarkshire
Priority  Support all children and young people to realise their full potential
Ambition statement (7) Enhance collaborative working to maximise support and ensure
all our children and young people are included, supported, and safe
AGENDA ITEM 10
Page 175 of 253

Page 176

1. Background 
1.1 The Council has a longstanding commitment to improving outcomes for children and
young people who are experiencing care or who are care experienced. This is reflected
in the current Children’s Services Plan (2021-23) and the programme of work
supporting the Plan for North Lanarkshire. The Council is also a signatory to the
Scottish Care Leaver’s Covenant with sets out a range of commitments to improving
support for care leavers. Since 2018, an elected member has been appointed as a
Care Experience Champion 
1.2 Following the publication of the Promise in February 2020 which set out the findings of
the Independent Care Review and a path for a 10-year transformation programme for
the delivery of care and family support, full council also passed a motion in August 2020
confirming a commitment to Keeping the Promise to Scotland’s children, young people
and their families. The Promise Plan 21-24, published on 31st March 2021 provides a
national framework for the first phase of this transformation programme and a
benchmark for local improvement activity. 
1.3      Our Children’s Services Plan 2021-23 is currently being updated. It is anticipated that
the format will continue to be built around the framework of the Promise and UNCRC.
Whilst the delivery of the Promise in North Lanarkshire requires whole system change
and a wider focus on holistic support for families, a commitment to support the best
possible outcomes for the 668 children who currently experience care across a range
of settings, including those supported at home, remains fundamental. 
2. Report – Progress Update 
The Champions Board and Promise Partnership 
2.1 The North Lanarkshire Champions Board provides a platform for senior leaders across
services and partner organisations to engage with, listen to, and work alongside care
experienced young people to develop policy and inform local service development. The
Today not Tomorrow (TNT) Group is an established group of older care experienced
young people who work with the Champions Board. The Promise Development Team
provides support to TNT, assisting them to take forward developments and providing a
link to the Council and its partners. In addition, two more activity-based groups for
younger children and those aged 12-16 also support participation. A Development
Worker in Who Cares Scotland supports the groups and work of the Champions Board.
This post is financed by the council and its partners.  An example of joint work by TNT
and the Promise Development Team continue to support the implementation of
Promise is the promotion of the online resource to support managers and practitioners
on how to improve record keeping and make this more child-centred with a focus on
the impact of language – attached as Appendix 1. 
2.2 TNT have also produced a helpful quick guide to good corporate parenting, attached
as Appendix 2, and in collaboration with the Promise Development Team, facilitated a
development session with the NL Promise Partnership: Care Foundation, the corporate
parenting task group of the Children’s Services Partnership. Actions, including the
possibility of re-naming the group to better reflect the group’s purpose and its
collaboration with children and young people, will now be taken forward. 
2.3 Following the successful scoping and framing of the key qualities required of mental
health support for care experienced young people and presenting this at a national
event last year, some of the groups have been involved in the procurement process for
Page 176 of 253

Page 177

a counselling service, with its focus and delivery shaped to meet the particular needs
and preferences of care experienced young people. This has been a great example of
co-production in North Lanarkshire using lived experience to ensure services are
targeted effectively and are accessible. 
2.4 The Champions Board also support a range of wider activity to engage care
experienced children and young people throughout the years, most recently a
successful Christmas ‘movie night’ in the Cumbernauld Theatre complex.  A number of
care experienced children and young people and corporate parents from across the
partnership, including elected members, enjoyed a screening of film, Elf and gifts for
the children and young people were distributed. 
2.5 Celebrating Care 
Care week was held in October and all of the children’s houses along with TNT ensured
this was a great celebration of the achievements of our care experienced population.
Each children’s house took a foundation of The Promise as their theme and arranged
events celebrating this aspect of care. Who Cares and TNT arranged a showcase event
highlighting the talents of our young people. 
2.6 Promoting the Promise 
In collaboration with TNT and the Promise Development Team, the council and its
partners have organised a Promise Conference: Building a Promise Community, which
will take place on the 03/02/23. The conference was agreed by the Council’s Policy and
Strategy Committee in September 2022 as a vehicle to continue to build ownership of
the Promise across North Lanarkshire and in line with this aspiration planning for the
event has been taken forward by a partnership group and the Promise Team. The
conference will provide the opportunity for partners to consider developments to date,
to identify future priorities and to engage our communities and partners beyond
children’s services in future actions to support delivery.   
2.7 Next Steps 
• Recording practice steering group to take a stock take of achievements and
progress to date and develop a revised action plan for 2023/24. 
• Delivery of the Promise Conference: Building a Promise Community is delivered,
actions and legacy identified and incorporated in action planning for the
implementation of the Promise. 
• Further development of the Corporate Parenting Task Group/NL Promise
Partnership – Care to allow for a more collaborative approach. This will provide
greater opportunity for hearing children and young people’s voices and allow them
to shape service design. 
Page 177 of 253

Page 178

Children’s Houses 
2.8 Outreach work continues to be maintained and further developed by those working in
the houses to support young people moving to more independent living. The houses
have facilitated a ‘return to care’ for a small but significant number of younger adults
who needed support at a times of crisis and instability in their lives. To date this has
been successful in helping to achieve stability and keeping them safe. The learning will
inform how we provide this care for other care experienced young people who are living
independently but who are experiencing trauma and crisis. This is in line with the
aspirations of the Promise, children, and young people’s right to ‘Return to care’ if
necessary but is not without challenge including the impact on the availability of space
in the children house and how we manage children and young people 18+ living in a
regulated care provision. 
2.9 Over the past 12 months our Children’s Houses have also been critical to supporting
the increase in the number of our unaccompanied asylum-seeking children and young
people who have been placed through the National Transfer Scheme (NTS). The
managers and practitioners have been responsive to the needs of the children and
young people, who have experienced considerable trauma and disruption. 
2.10 Over the past 12 months we have worked continuously with the Housing Service
including local housing champions in each locality with further focus on identification of
satellite accommodation as a vehicle to support young people who are ready to make
their first steps to independent living whilst continuing to be support by their children’s
house. 
2.11 All of the houses have been inspected in the last 8 months; this was following on from
there having been no inspections for the duration of the pandemic. The inspections
were positive, and the care inspectorate highlighted the strength of staff relationships
with young people and commented on the excellent support offered to our
unaccompanied asylum-seeking young people. 
2.12 In October during care week the First Minister visited Buchanan Street Children’s house
and spent time talking to staff and young people. A display of work by care experienced
young people across the authority was showcased, with the First Minister expressing
her admiration for the work of the young people 
2.13 Next Steps   
• Continued development of best practice in supporting unaccompanied asylum-
seeking children and young people, to assist them to reach their potential as young
citizens in our communities. 
• Prioritisation of practice development to promote lifelong relationships, including
increasing the capacity for and the consistency of ‘outreach’ work when young
people move on including support to parents and children when children return to
their families. This will also include the further development of satellite
accommodation linked to our houses as well as further supporting the ‘right to
return’ wherever possible. 
Page 178 of 253

Page 179

Review and Development of Corporate Parenting Services 
2.14 The Children and Young People (Scotland) Act 2014 defines corporate parenting
as "the formal and local partnerships between all services responsible for
working together to meet the needs of looked after children, young people and
care leavers". 
2.15 The 2014 Act introduced new duties and responsibilities for Scottish public bodies
defined as corporate parents, effective from April 2015. Statutory guidance on Part 9
(Corporate Parenting) of the Children and Young People (Scotland) Act 2014 was
published to provide corporate parents with information and advice. 
2.16 Corporate parenting includes children and young people in residential, foster, kinship,
continuing, and supported care and those experiencing care at home because they are
subject to a compulsory supervision order, as well as the provision of pre and post
adoption support. We reported to Committee in September on developing a proposal
to review our children’s carers team.  We have since extended the proposal to include
all aspects of corporate parenting, building on the work already undertaken including
residential provision. The anticipated timescale is completion of the review by July
2023. 
2.17 Next Steps 
• Agree representation for the oversight group, identify relevant task groups and
focus groups, including engagement across the partnership and with children,
young people and families. 
• Proposed actions arising from the review will be considered and agreed through
service management structures and an update provided as necessary to future
Education and Families Committee. 
Virtual School 
2.18 The virtual school continues to be key to delivering the Promise Plan 21-24 in offering
support to care experienced children to improve educational outcomes including
reducing exclusions and a challenge and scrutiny role as well as providing direct
support to children, young people and their carers. The increase in staffing and
resource, reported to the Committee in September 2022, has strengthened the capacity
in particular to offer early support to younger children. 
2.19 Two staff members of the Virtual School team have now gained the Forest School
Leader qualification which has allowed the further development and extended delivery
of this programme, utilising several local green spaces and wider resources. 
2.20 A summer project involving a small number of young people resulted in the creation of
a welcoming outdoor seating space for families to meet, and the creation of a tranquil
forest space with a sensory area for use by young people, families or staff at Virtual
School base at The Carers Centre.   
2.21 During the current 2022-23 session, the Virtual School has continued to explore new
opportunities to support learners.  New groups offered over the first term have included
a sports-based Health and Wellbeing group for girls of high school age in partnership
Page 179 of 253

Page 180

with Active NL and the delivery of the Fire Reach programme in partnership with Fire
Service.  The Letterbox Club, a reading improvement programme for disengaged or
reluctant readers in partnership with BookTrust, is currently being piloted within one
cluster.  Groups include learners from primary and secondary stages with positive
feedback from young people involved, their schools and families. 
2.22 Support for young people and their families over Christmas saw the delivery of 94
selection boxes, 49 personalised gifts for young people working with Virtual School and
20 families received a “family fun giftbag” which included a selection of items for use
over the festive period to encourage families to spend quality time together. 
2.23 One further cluster is currently engaged in the ongoing implementation of the Keeping
the Promise award, as part of their Cluster Improvement Plan. 
2.24 The Virtual School Lead and Officers have recently visited each high school to meet
with Designated Managers and Cluster Innovation and Improvement Leads (CIIL). The
focus of the meetings was to provide an update on the service, further enhance
partnership working and to discuss expectations around planning for care experienced
learners. CIILs will support these discussions with primary designated managers in the
coming term. Visits to Social Work localities are also in progress to support and develop
staff understanding of the role of the Virtual School, supports available and how this is
accessed within the GIRFEC framework. 
2.25 Next Steps 
• Continue to build on visits with relevant partners to provide service update and
strengthen joint planning and support for care experienced learners. 
• Expand the delivery and wider reach of Keeping the Promise Award. 
• Continue to build capacity within the Virtual School team and with partners, to
explore and expand new opportunities for supporting care experienced learners 
• Continue to monitor outcomes and to support and challenge schools on
engagement, attendance and attainment. 
The Promise Development Team 
2.26 The Promise Development team was established in 2021 with 3 FTE development
workers and an Assistant Support Worker was subsequently created, the latter funded
by NHSL, All the team members are care experienced young people, a model which
has since been replicated in other areas. 
2.27 The team have focussed on several areas since their inception contributing to culture,
system and practice improvement around family time, brothers and sisters, health and
wellbeing, record keeping and language. 
2.28  The team have spent time with other local authorities including South Lanarkshire,
Glasgow and East Renfrewshire sharing ideas, experience, and work plans and they
continue to engage with national groups to support the implementation of the Promise. 
2.29 Recently it was agreed to create an additional 0.5 support worker and the young person
will join the team soon. Office space within the Dalziel Building has been secured and
Page 180 of 253

Page 181

the team are looking forward to having a base where they can meet as a team and plan
and co-ordinate the work plan for the coming year. 
2.30 Next Steps 
• A team development day to revise our priorities for 2023/24 and to produce a
current continuous improvement plan. 
National Transfer Scheme   
2.31 Since the introduction of the National Transfer Scheme in October 2021, North
Lanarkshire have supported 19 newly arrived young people all of whom arrived under
the age of 18, ten of these young people arriving in the last 6 months. We have
continued where possible to ensure young people’s first destination is our children’s
houses, to ensure wrap around support and robust assessments can take place prior
to moving on to another arrangement suitable to the young person, such as
independent living or supported care. There are currently 8 young people residing in
children’s houses while 1 is in foster care; 3 of these young people are under the age
of 16. For those over 16, they are being supported with future planning towards their
next steps. 
2.32  It is anticipated that the numbers of young people requiring accommodation and
support will continue at least at the same pace. To support the increasing demand,
there will be a focus on targeting recruitment of supported carers, as well as upskilling
of current carers. Work remains ongoing in respect of other options for supported
accommodation to ensure an appropriate and sustainable model can be achieved in
the longer term. Our Housing Services are supporting this initiative and are working in
collaboration with the Resettlement Team to increase options available for those young
people who are ready to move on. 
2.33  Next Steps 
• Recruitment drive for supported carers. 
• Further develop resource for supported accommodation. 
Lifelong Links 
2.34  Lifelong Links is a project, currently supported by funding from the national promise
partnership fund administered by Cora.  Temporary funding is supporting two staff
based alongside our aftercare hub and family group decision-making teams within
intensive services, work with young people in the transition into adulthood and who are
preparing to leave care or are care leavers.  The broad aim of this work is to support
connection and reconnection with those important to them to identify and strengthen
support networks.   Some young people have a clear objective regarding who and what
they want to achieve through Lifelong Links, for some this requires to be established
through the work undertaken.   
2.35  The progress of Lifelong Links for each young person is at different stages. It is
apparent from the initial engagement with the 11 young people that Lifelong Links is a
hugely emotional and challenging experience. There is a clear need for this work to
Page 181 of 253

Page 182

progress at the young person’s pace with appropriate support to ensure their wellbeing
throughout. In all cases the early preparation and initial research has been undertaken
to clarify the background information held in formal records. All young people are in the
process or have completed ‘mobility mapping’ to establish their understanding of their
life story, the people and places they recall. 
2.36  Staff are required to support young people with gaps in their life narrative to progress
lifelong links. Following this, a number of young people have identified and prioritised
the people they wish support to establish or re-establish a relationship with. Staff are
preparing and supporting the young people for this, including the potential of a negative
response, whilst making connections with the identified individuals. To date, in work
with young people this has included an ex foster carer, placement staff, a support
worker and family members however for all this is taken forward at both the young
person’s pace and carefully and individually planned. 
2.37  To support staff, undertake Lifelong Links access to Ancestry, Trace Genie, Geno Pro
and specific social media was required to facilitate this work. The staff have access to
these applications and the support to utilise these as required. The aims and objectives
of lifelong links has been promoted across social work localities, through the carers
team, children’s houses and aftercare hub to seek referrals from young people who
would benefit from this service. 
2.38  Next Steps   
• It is planned to continue to develop the service and to explore future funding options
to extend this beyond the current 12-month period given the early positive feedback
but the need, given the nature of the work, for a longer period on which to evaluate
its value. 
3. Measures of success 
3.1  A range of measures relation to specific strands of work described above have been
detailed in previous reports to committee and are also reflected in the current Corporate
Parenting Strategy and the strategies Improvement Plan the NL Promise Delivery Plan
21-24. These are aligned to the NL Children’s Services Plan, 21-23.   
4. Supporting documentation 
4.1  Appendix 1 - The Promise Plan 21-24 https://thepromise.scot/plan-21-24/
4.2 Appendix 2 – TNT Top Tips for Corporate Parents presentation. 
Alison Gordon 
Chief Social Work Officer (Education, Families, Justice and Integrated Practice 
Page 182 of 253

Page 183

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The commitment to the Champions Board for the ongoing support to TNT is being
delivered though reconfiguration of existing service budgets and contributions from
partners. Virtual school funding is primarily though the Care Experience Children
and Young People element of SAC funding but as noted above has been
supplemented for 2022-23 from recovery funds. Tariff funding is received from the
Home Office for each UASC transferred under NTS to North Lanarkshire.
Funding for the lifelong links project is currently via 12 month external funding from
Cora/Promise Partnership – further options to sustain this service within existing
resource or through alternative partnership resource are being explored. 
.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The developments described within this report support the Council to fulfil its
corporate parenting duties as set out in the Children and Young People (Scotland)
Act 2014. 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The Promise, published in 2020 and Promise Plan (21-24) remain the main
national drivers for the activity outlined in this report. Specific legislative changes
have been made through the Children (Scotland) Act 2020 strengthening duties
Page 183 of 253

Page 184

with respect to brothers and sisters and it is anticipated further changes including
to the Children’s
Hearing system will follow. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed. 
Mirroring the national picture and work undertaken by the Independent Care
Review there are significant human costs as well as financial costs on services
locally should work to improve outcomes and support for care experienced young
people to succeed and participate fully in community life fail. In the medium term
however, there is uncertainty about any additional investment available to support
and sustain some of the change required to deliver the Promise in North
Lanarkshire. The continued support for our unaccompanied asylum-seeking
children although funded through the Home Office as previously reported to
Committee is also impacting on capacity in our children’s houses which can impact
on ability to meet other demands
Page 184 of 253

Page 185

5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 185 of 253

Page 186

Appendix 1 
In August 2021, a working group was set up to explore how we could meet the commitment of The
Promise to improve the language that we use. Together, with the help of people with lived experience of
care of all ages from “Crafty Foxes” “Mad Middles” and “TNT-Today Not Tomorrow” we have prepared a
language guide. This guide includes language that needs to be eradicated, and suggestions of alternative
more appropriate language. 
In completing this work, we were guided by participation principles. These principles are: 
• Adopt a rights-based approach
• Create and support opportunities for engagement, participation, and involvement.
• Ensure views and opinions are valued and respected
• Enable staff to support engagement, participation, and involvement. 
We are pleased to note that these principles were fully utilised in creating this language guide. 
Here is a sample of the language that needs to change. This is not a one size fits all approach and
language must be tailored to the needs of the people we serve. 
“Scotland must understand that ‘language creates realities.’ Those with care experience must hold and
own the narrative of their stories and lives; simple, caring language must be used in the writing of care
files.” (The Promise, Page 69)
Page 186 of 253

Page 187

Word and phrases we do not like: Alternative Suggestions
Residents Young People
Education School or College
Contact Family time
Unit House
Abscond/Missing Ran Away
Siblings Brothers and Sisters
Placement Home
Sanctions Consequences
LAC/LAAC Young People, Care Experienced Young People, use
their name!
Challenging behaviour In distress, reacting to a situation, unmet need, upset
Defiant Strong willed
Confident in their choices/opinions
Aggressive Reactive (reacting to a situation)
Attention seeker Looking for help/support
Unmet need
Vulnerable Cherished
It’s their fault they are in care Through no fault of their own
Manipulative Assertive, intelligent
Putting themselves in danger Seeking reassurance elsewhere
Non engaging Not ready – look at organisation & family approach
here Non-compliant
Social work wean No alternative – just don’t use it!
Placing themselves at risk Seeking reassurance elsewhere
Promiscuous Seeking reassurance/comfort elsewhere
Page 187 of 253

Page 188

Making choices (drug/alcohol
related)
Poor coping mechanisms, seeking something,
survival mode
Hard to reach Not approached enough
Difficult Struggling to cope 
This list is not exhaustive – if you have any other ideas, please email Promise@northlan.gov.uk 
Page 188 of 253

Page 189

Appendix 2 
Page 189 of 253

Page 190

Page 190 of 253

Page 191

Page 191 of 253

Page 192

Page 192 of 253

Page 193

Page 193 of 253

Page 194

Page 194 of 253

Page 195

North Lanarkshire Council
Report
Education, Children and Families Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  AG Date 28/02/23 
P080.1 Keeping the Promise: Support for Families, Children and
Young People.  Review of Youth Justice Services 
From  Alison Gordon, Chief Social Work Officer (Education, Families, Justice &
Integrated Practice)  
E-mail GordonA@northlan.gov.uk Telephone 01698 332001 
Executive Summary 
A recent report by the former director of the Children and Young People’s Centre for Justice
found children in conflict with the law in Scotland experience stigmatisation, trauma and
poor outcomes (Lightowler, 2020).   A new approach to youth justice in Scotland is required,
which proceeds from a rights-respecting approach, supports all children under the age of
18 to participate in decisions about them, directs positive support to families, and offers
that support through safe and caring relationships.   
In this context a youth justice steering group was established in 2021 to review the
approach to supporting young people in conflict with the law in North Lanarkshire and
ensure services meet the outcomes and priorities outlined in Justice for children and young
people – a rights respecting approach (Scottish Government, 2021).   A further aim is to
deliver the specific call to action in The Promise Plan 21-24 to end the disproportionate
criminalisation of care experienced young people.   
This report summarises the principal findings from this review and the plans to take forward
a rights’ respecting approach. In particular, it outlines the plans to integrate Early and
Effective Intervention (EEI) with our approach to Getting It Right for Every Child and
Empowering Clusters and for a partnership with the Scottish Children’s Reporter’s
Administration to improve the experiences and outcomes of children referred to children’s
hearings on offence grounds with a view to diverting as many children as possible from the
courts to the hearing system. 
Recommendations
It is recommended that the Education, Children and Families Committee: 
1. endorse the piloting of Early and Effective Intervention (EEI) through the GIRFEC
pathway as part of the Empowering Clusters approach;
2. agree not to retender or recommission an externally provided EEI service, in line
with the options appraisal, subject to completion of due diligence and production of
a business plan to include consideration of, financial, legal and HR implications;
and
3. agree to develop an in-house youth work response to EEI aligned with the support
and services being developed through the Empowering Clusters approach.  
AGENDA ITEM 11
Page 195 of 253

Page 196

1. Background 
National Context 
1.1 The primary role of youth justice in Scotland is to improve the life chances of children
and young people, and to work with children, their families, and communities to
prevent harmful acts.  The recognition that children in conflict with the law are also
children in need has been a key tenet of the Children’s Hearing system since its
inception.  At a national level a welfare approach to young people in conflict with law
has been driven by Preventing Offending:  Getting It Right for Every Child, which
placed an emphasis on advancing the Whole Systems Approach to supporting young
people.  In June 2021, Scottish Government published a revised framework, Justice
for children and young people – a rights respecting approach – vision and priorities,
in recognition that a greater emphasis on upholding the rights of children and young
people in conflict with the law is required in order that children participate in decisions
about them, and that support is rooted in safe and caring relationships.  The priorities
emphasise the need to continue to advance a whole system approach, improve
collation of data, and a need to address mental health issues, and the speech and
language needs of children in conflict with the law. 
1.2 The Promise’s key findings and calls to action for youth justice are centred on
avoiding and stopping the criminalisation of care experienced children.  The Promise
Plan 21-24 makes the following demands on government and partners: 
• The disproportionate criminalisation of care experienced children and young
people will end. 
• 16- and 17-year-olds will no longer be placed in Young Offenders Institutes for
sentence or on remand. There will be sufficient community-based alternatives so
that detention is a last resort. 
• Children who do need to have their liberty restricted will be cared for in small,
secure, safe, trauma-informed environments that uphold their rights. 
1.3 In addition, new Scottish Sentencing Guidelines came into force on 26 January 2022
which require courts to have regard to rehabilitation as a primary consideration.  The
guidelines take cognisance of research on brain development that has found that
young people are not cognitively or emotionally mature until approximately age 25. 
1.4 In December 2022, the Scottish Government published a Children (Care and Justice)
Bill. The Bill proposes a number of measures to improve experiences and promote
and advance outcomes for children in contact with care and justice services.  In
particular it will enable all children under the age of 18 to be referred to the Principal
Reporter, removing existing restrictions on eligibility for 16 and 17 year olds. This will
enable the removal of nearly all children from the court system and end the placing of
children in young offenders institutions.   
The Plan for North Lanarkshire
Priority  Support all children and young people to realise their full potential
Ambition statement
(10) Engage with children, young people, parents, carers, and
families to help all children and young people reach their full
potential
Page 196 of 253

Page 197

Local Context 
1.5 Our approach and supports for young people in conflict with the law was last
reviewed more than five years ago.  As a result of a reduction in youth offending and
a shift in national policy away from disrupting anti-social behaviour to a much more
explicit welfare response, youth justice work was moved from dedicated workers to
social workers in localities and in intensive services.  A specific service to support
young people reintegrate to the community from custody, Youth Bridges, was also
established funded by the Alcohol and Drug Partnership (ADP). 
1.6 Since this time the Plan for North Lanarkshire has set a clear strategic direction to
ensure support to children and families is available at an early stage for them to fulfil
their potential.  In support of this ambition, the integration of children’s social work
with education and wider services such as CLD and employability has created new
opportunities to deliver an integrated approach to deliver a whole system approach to
young people in conflict with the law.   
1.7 In the context of this and the national developments outlined above, a review of the
approach to youth justice was established in 2021 to evaluate how effectively the
service was supporting young people in conflict with the law. 
2. Report 
2.1 The review was multiagency and started from a focus on practice as well as the
experiences and outcomes for young people rather than organisational
arrangements.  The review was informed by a file audit, feedback gathered from
children, young people and their families, staff focus groups conducted by the
Children and Young People’s Centre for Justice (CYCJ) and a staff
questionnaire.  The evaluation work was undertaken with reference to the standards
set out within the new Youth Justice Standards (Scottish Government, 2021).  A
further aim of the review was to establish a clear baseline of data to support planning
and the measurement of impact of quality improvement initiatives.  Service
developments have been made as the review has progressed. 
Rights and Participation 
2.2 Staff reported having a good awareness of the rights of children.  Current research
being undertaken by the Universities of Sussex and Durham on trauma-informed
practice within the service has observed social work staff ensuring the rights of young
people are proactively promoted in meetings and interventions.  However, the review
has highlighted that practice is inconsistent for young people in conflict with the law. 
While young people and their parents were invited to meetings, the majority of young
people in conflict with the law did not feel fully informed about the process and most
did not have advocacy.   
2.3 As part of the review a number of themes have come from feedback from young
people: 
• Young people in conflict with the law had a fear of the police which often
triggered their behaviour: “I’m not being bad, I’m hurting and I don’t know how to
tell them that”.  Some young people also did not understand the role of ‘campus
cops’ and did not see them as a support.
Page 197 of 253

Page 198

• Young people were very positive about the impact and support of CLD. They
spoke about how CLD staff made them feel safe, important, cared for and
provided spaces and opportunities they might not otherwise receive.
• Some young people spoke of nights they had spent in police custody and how it
could be an unknown professional who comes to collect them.
• Young people were unsure about what formal processes they were involved in,
particularly what Early and Effective Intervention is.
• Court processes were difficult for young people to understand and they did not
always feel there was someone supporting them. 
Actions and next steps 
2.4 A group of young people to participate in the design of youth justice services has
been formed and is facilitated by the Promise Development workers.  As a result of
their input to date, a number of initiatives are planned, or are underway, including: 
• work with Police Scotland, through Contextual Safeguarding, to take a trauma-
informed approach in response to young people when they come to the attention
of the police. 
• action to ensure young people are accessing advocacy from Who Care’s?
Scotland
• a new partnership with the NHSL speech and language team to promote the
ability of individual young people exercise their rights in children’s hearings (or
court) to express their views more effectively through assessment of
communication needs (see 2.20).
• Young people’s views being made central to planning through the alignment of
Early and Effective Intervention with planning for children’s wellbeing in schools
and Empowering Clusters as set out in 2.10-2.12.
Prevention and Early and Effective Intervention 
2.5 Early and Effective Intervention (EEI) is a national initiative and was developed as a
mechanism to support children who come to the attention of the police for offending
behaviour at an early stage. Its oversight sits within Children's Services Planning as
specified in the Children and Young People (Scotland) Act 2014.   It is a voluntary
process where concerns regarding a child's wellbeing have arisen in response to
their alleged involvement in an incident which has brought them into conflict with the
law. 
2.6 In North Lanarkshire, EEI has been managed by a coordinator based in Police
Scotland (funded by the council) and a dedicated social worker. When the police
refer a child into the EEI process, the child’s needs are considered by a multiagency
group comprising police, social work, education and housing but none of the group
members know, or have a relationship, with the child under discussion.  The group
sits apart from the GIRFEC pathway.  Therefore, related issues facing children such
as attendance and family difficulties are not connected to alleged offending and
considered as part of a holistic plan.  In 20/21, 186 children were discussed and the
group made the following decisions as detailed in the chart below:  
Page 198 of 253

Page 199

• ‘Current measures’ refers to children who already have an allocated social worker
and are referred back to the social worker for ongoing work 
2.7 In terms of current measures an analysis of social work files indicates that an EEI
referral did not consistently trigger anything significantly different in the plan to reduce
the risk of criminalisation. 
2.8 Within the current process young people have limited voice in the decision making, or
on what might help them, and their views are only sought through contact between
the EEI coordinator and their social worker, if they have one. 
2.9 Also of note is the fact that almost as many children in conflict with the law are
referred to SCRA as to EEI.  In the period 21/22 169 children and young people were
referred to SCRA on offence grounds. In total 36% of referrals to SCRA in 21/22
were on offence grounds compared to a national average of 20%.  This suggests the
need to better use EEI to prevent escalation to the Reporter and reduce the potential
for criminalisation.   
Proposals for change and next steps 
2.10 In order to provide more robust and relationship-based support to children who
become involved in alleged offending behaviour, the service is integrating the EEI
process with the GIRFEC pathway.  In practice this means that when a child is
referred by Police Scotland into the EEI process, it will be directed to the named
person and/or lead professional for the requirement to consider a wellbeing meeting
as with all other wellbeing concerns.  This will ensure that the views of the child and
Page 199 of 253

Page 200

their parents/carers are part of the process and that the child’s needs as a whole are
considered. This is crucial given research is clear that focusing on behaviour is
usually ineffective by itself (Case and Haines, 2015) and that it is more important for
the adults who know the child to take responsibility for supporting the child or young
person.  Using the GIRFEC pathway will support a more strengths-based approach
that leverages and builds on existing strengths within the child, and the systems
surrounding them, to shift away from a deficit-based/offence focused model. A draft
outline of the process is attached at Appendix 1.  The approach will be piloted in
seven clusters across the authority.   
2.11  Outcomes for the child will be tracked through the child’s plan and the
implementation of the Outcome Star and through tracking any involvement in alleged
reoffending. 
2.12 Research finds that when children come into conflict with the law the responses most
likely to prevent any further offending will focus on children’s strengths and capacities
as a means of facilitating desistance, restoration and inclusion (Case and Haines,
2015). Such supports are already available to children within schools and through
Empowering Clusters to achieve this.  A minority of children require some more
specific support around their behaviour and this is currently provided by a service
commissioned from YMCA Bellshill and Mossend.  An options appraisal has been
undertaken to inform a recommendation about next steps in providing this service,
including whether this contract should be continued (see appendix 2 for a more
detailed explanation of this process).  The recommendation of this appraisal is to
bring the service in-house and take a youth work approach that is fully aligned and
integrated with local supports and services at universal and additional levels through
the Empowering Cluster approach.  The process of bringing the EEI support service
in-house would follow the council’s project management approach, including a full
business plan and register identifying and mitigating any risks. 
Statutory Intervention:  Children’s Hearings and Court 
2.13 North Lanarkshire has a higher than average rate of referrals to the Scottish
Children’s Reporter’s Administration on offence grounds when compared to other
local authority areas in Scotland.   In the year 2021/22, 477 referrals for 182 children
were submitted to the Reporter on offence grounds.  However, SCRA take a welfare
approach to decision making in respect of these referrals to avoid, where possible,
the criminalisation of children.  Consequently, despite this high number of referrals
only 7 new referrals were made to children’s hearings on offence grounds and a
further 62 referrals dealt with under measures already in place for children on a
compulsory supervision order.   
2.14 While nearly all assessments within the file audit were assessed as good or better,
not all children and young people had a robust multi-agency plan.  Overall, the review
found that plans were mainly focused on the offence and social work intervention,
rather than reflecting a more holistic, or family support, based approach. 
2.15 The Procurator Fiscal and Courts have a number of options available for young
people aged 16-18 who are in conflict with the law. The Procurator Fiscal is able to
divert young people from prosecution and refer them to social work for support.   The
number of young people diverted from prosecution has been increasing over the past
4 years and the file audit found that in these circumstances the support subsequently
provided was good, with nearly all the young people subject to diversion completing
the intervention successfully without re-offending.   
Page 200 of 253

Page 201

2.16  When young people under the age of 18 are convicted in court, three principal
community based disposals are available:  a Community Payback Order (CPO),
Structured Deferred Sentence (SDS), or remittal to a Children’s Hearing for disposal
(providing the young person is not over 17½ years). In the file audit nearly all the
court reports where young people were made subject to a CPO were found to be
good with most young people successfully completing their order.   
2.17 The aim of the SDS Court order is to prevent further offending through intensive
support underpinned by a holistic plan of intervention, and regular court reviews with
a consistent Sheriff who gets to know the young person.  The key ethos behind the
implementation of SDS is a strong focus on the young person’s needs, rather than
focusing solely on their offence.  The outcomes for young people subject to a
Structured Deferred Sentence are very good, with the high level of contact with social
work and a consistent Sheriff key factors.  However, prior to the review SDS was only
operating in Hamilton Sheriff Court resulting in a relatively low number of young
people benefitting from this disposal.  Following engagement with the Sheriff
Principal, as part of the review, an SDS court has been established at Airdrie Sheriff
Court and has been in operation since July 2022.   
2.18 The Sheriff is also able to remit young people aged 16 to17½ to a Children’s Hearing
for disposal.  However, in 2021/22 only four young people were remitted to a
Hearing. While this reflects low numbers nationally, it may indicate a need for clearer
recommendations in social work reports to assist Sheriffs in their decision making. 
2.19 Locally the number of young people either remanded or sentenced to custody has
been decreasing in line with national trends and sentencing guidance.  Nevertheless,
there were 21 new admissions to Polmont YOI of young people aged 16 to 21 years
from North Lanarkshire in 2021/22.  Since April 2022, 8 more young people have
been admitted to custody, all on remand, 2 of whom are under 18.  Recent research
has highlighted that detention in Scotland is not being used as a last resort or for the
shortest time possible, with many children reporting being subject to prolonged
periods on remand with no option for community-based alternatives (McEwan et al.,
2020).  To support this group of young people, support staff from Youth Bridges (part
of our intensive service) meet with all young people within 3 days of receiving
custody and work with prison, health and other staff to support the young people and
arrange family contact.  Youth Bridges workers prioritise building relationships with
young people so they have a trusted worker to support them through the transition
back to the community.  With the support of Youth Bridges, nearly 90% of the young
people who returned to the community were not involved in further offending and
69% reported a reduction in alcohol and drug use. 
Proposals for change and next steps 
2.20 While improving the support to young people appearing in court will continue, the
overall aim of the review is to continue to reduce the numbers of young people in
conflict with the law being dealt with by the court system.  To meet the requirements
of The Promise Plan and increase community-based alternatives to secure and
remand, ending the use of YOIs for 16 and 17 year olds, a pilot has started, in
partnership with SCRA and South Lanarkshire Council, to make better use of the
Hearing System to support young people in the community.  The pilot has engaged
with the Procurator Fiscal service and the Sheriff Principal to promote young people
being maintained in, or remitted to, the hearing system.   
2.21 The aim of the pilot is to divert more young people into the Hearing system and to
provide a tailored approach to those young people in conflict with the law at an earlier
Page 201 of 253

Page 202

stage, reducing the likelihood of interaction with the adult criminal justice system by
altering the young person’s offending trajectory at an earlier opportunity.  An
innovative part of the programme is to draw on the success of Structured Deferred
Sentencing in the court system by piloting a similar approach in hearings with the aim
of young people spending less time on a Compulsory Supervision Order with a
comprehensive care plan underpinned by intensive service provision, the measures
in the Compulsory Supervision Order and using, where possible, panel member
continuity, to meet need holistically.  The pilot comprises a dedicated Reporter and
senior social worker to oversee the work.  Specific social workers in locality teams
are being trained in the approach which includes a focus on trauma-informed practice
and addressing communication and mental health needs.   
2.22 The review group is also taking forward a number of actions to ensure that holistic
plans for young people in conflict with the law are in place as part of the pilot and
more generally.  The service has secured additional support work staff (funded via
the ADP) to provide holistic support including at evenings and weekends within
intensive services.  Funding has also been secured for a post to specifically support
young people secure and sustain employment or training, which is being
implemented in partnership with Employability Support & Skills Development.  To
address unmet speech, language and communication needs, as part of the pilot, we
have reallocated resources in partnership with NHS Lanarkshire to ensure that all
young people referred to a Hearing on offence grounds, will have a speech and
language assessment and that tailored support will be given to support young people
communicate their views in the Hearing to ensure their rights are upheld.  In addition,
we are working with NHS Lanarkshire to create a specific ‘youth justice pathway’ for
young people to access health care and advice from school nurses.   
3. Measures of success 
3.1 Children and young people in conflict have their rights respected and are able to
express their views in meetings and hearings. 
3.2 Outcomes for children and young people improve holistically – measured via the
Outcome Star. 
3.3 Reduction in numbers of children and young people re-referred into EEI processes. 
3.4 Continued reduction in number of 16 and 17 year olds placed remanded or convicted
to secure care or YOI with an aim of reducing this to zero by 2024. 
4. Supporting documentation 
4.1  Appendix 1 Policy for use of Family Engagement Support Assistant – December
2022. 
4.2  Appendix 2 Early and Effective Intervention (EEI) – Youth Justice, Education and
Families. 
4.3  Appendix 3 Justice for Children and Young People: A Rights Respecting Approach –
Vision and Priorities. 
Page 202 of 253

Page 203

Justice for children and young people - a rights-respecting approach: vision and priorities - gov.scot
(www.gov.scot) 
Alison Gordon
Chief Social Work Officer (Education, Families, Justice & Integrated Practice) 
Page 203 of 253

Page 204

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
No adverse impacts are anticipated.  Whilst a change in EEI service provider may
affect continuity of service, effective contract management will ensure that there is
a smooth transition and a seamless handover.     
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Additional support worker posts are funded through the Alcohol and Drug
Partnership and Employability Support & Skills Development.  These monies are
temporary as part of the piloting of the new approaches outlined in the Report.   
The current contract with YMCA Bellshill and Mossend costs £106,387.  It is
estimated that costs could be brought down to between £80-90K if brought in
house. There may be some termination costs. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Bringing the commissioned EEI service in-house may give rise to a relevant
transfer under the Transfer of Undertakings (Protection of Employment)
Regulations 2006 (TUPE).  If so, all statutory and good practice requirements in
terms of TUPE will be adhered to.
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Page 204 of 253

Page 205

In the event of the commissioned EEI service currently being provided by the
YMCA Bellshill and Mosshead being retendered or brought-in house (as
recommended), the application or otherwise of TUPE will be fully considered or
addressed.  The current contract does not provide the council with a right to
terminate the contract at its own discretion so there is a risk that YMCA may object
to this.
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
A DPIA is being undertaken to assess the impacts of bringing the commissioned
EEI service in-house means from a data protection compliance perspective and if
there is anything we require to do in order to facilitate this change. 
Yes ☒ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☒ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
An aim of the review of youth justice is to reduce the current risks that young
people’s rights are not upheld and their needs are not met when in contact with the
law.  As well as risk to good outcomes for young people, there are compliance and
Page 205 of 253

Page 206

reputational risks for the council if it does not ensure compliance with the new
national standards for youth justice.   
There may be a reputational risk to the council in bringing the commissioned EEI
service in-house and not going out to tender or continuing the current arrangement,
however, this decision has been supported by the council’s option appraisal
process (see Appendix 2). 
A project management approach is being taken to the proposal to bring the
commissioned EEI service in house and a risk register has been established
detailing the risks and appropriate mitigations.  The youth justice steering group will
continue post review to monitor the implementation of improvement work and
manage risks.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 206 of 253

Page 207

Appendix 1 
Early and Effective Intervention: Guidance
December 2022 
Key content:   
1. Introduction and Background 
2. Early and Effective Intervention 
3. The Process 
4. Central Point of Contact 
5. Routes to Help 
6. Staged Intervention and EEI 
7. The EEI Process 
8. Monitoring 
Page 207 of 253

Page 208

1. Introduction and Background 
This paper is intended to set out the process for early and effective intervention (EEI) coming
from police Scotland to education families, and how these will be dealt with through the
GIRFEC pathway. The paper will set out briefly the aim of EEI and will go on to describe the
process with a chart illustrating how this will operate. 
2.  Early and Effective Intervention 
The EEI process is based on research messages about effective intervention with children
who get into conflict with the law. The evidence shows that the majority of young people who
come into conflict with the law will not come into conflict with the law again, provided the
conflict is recognised by a figure that is significant in their lives, as soon as possible after the
event. Based on this evidence the early and effective intervention process was set up by
Scottish Government to operate between police Scotland and local authorities with the
following aims: 
• To as much as possible remove young people from the children’s reporter’s system
where the grounds for involvement are based solely on offences
• To give early help to those children and young people who require it, particularly where
they get into conflict with the law and have previous issues with school attendance or
care and protection in their family.
• To look at young people who come into conflict with the law as young people with well-
being needs. 
3.   The Process 
The following process is intended to set out a streamlined process for recognising where
young people come into conflict with the law and providing early help to those who need it. It
sits firmly within North Lanarkshire's empowering cluster approach and users EEI as a route
to the GIRFEC pathway for those who need early help. 
4.   Central Point of Contact 
All EEI referrals start with Police Scotland and be forwarded on to the youth justice team. This
team will record all referrals and pass them to the CIILs in the clusters to raise with the Named
Person in the school. The youth justice team will monitor the process and collect information
as to whether decisions are being made within the 20 working days required by national
standards. 
5.  Routes to Help 
Essentially the process gives three routes to help:
1. No help is needed, and the process ends (often the best outcome for most)
2. He Named Person in the school will call a wellbeing meeting and planning will proceed
from there
3. The young person is already being worked with by Social Work and the worker will call
a wellbeing meeting to consider any amendment of the plan. 
6.  Staged intervention and EEI 
The model of cluster working allows for the needs of children to be met through a joined-up
approach to children’s services. The EEI approach will sit within the planning for Children’s
Page 208 of 253

Page 209

Wellbeing approach in the clusters. The service sits at the universal and additional levels in
the staged intervention model. 
For those children and young people that are seen as requiring to be diverted out over the
system the EEI process will operate at to the universal level. Young people will continue to
have supports as needed through their school. For those children and young people that
require additional services the GIRFEC pathway will be used. The model is depicted in the
following chart. 
7.  The EEI Process 
Referral received by a single point of contact within Social Work
Services from Police
Referral  sent to allocated social
worker and also CIIL 
Is Young Person Working with
Social Work?
Referral is sent to the CILL
Yes No
Page 209 of 253

Page 210

8.  Monitoring 
National standards are in place for EEI processes to be measured against. These apply to
the process of involving young people and families and the timescales that referrals take to
reach conclusion. Monitoring will be carried out from the central point within social work
services. Each referral will be followed up with the CIIL or allocated Social Worker to gather
data on process followed and time taken to exit the EEI process. 
SW arranges Wellbeing Meeting to
review child’s plan
End of EEI process 
CILL Laisses with Named Person
Professional Dialogue
Is wellbeing planning
required ? (5 GIRFEC
Questions)
No needs requiring intensive or
additional planning  - EEI referral is
discussed with child and family and then
ended. 
If the YP has needs that require Wellbeing planning a
meeting is convened 
Move to planning through GIRFEC process, Assess,
Plan, Review.
Page 210 of 253

Page 211

APPENDIX 2 
Early and Effective Intervention (EEI) – Youth Justice, Education
and Families 
Senior Responsible Officer Alison Gordon 
Project Manager Andrew Gillies
Contact details GilliesA@northlan.gov.uk 
1.  Background 
1.1 EEI has been a feature of Scotland’s approach to young people in conflict with the
law since 2015.  It is a multiagency process for deploying support in a timely and
proportionate way to children who come to the attention of the police for offending
behaviour.   It is a voluntary process where concerns regarding a child's wellbeing
have arisen in response to their alleged involvement in an incident which has brought
them into conflict with the law. 
1.2 In June of this year the Scottish Government published revised Core Elements for
EEI, emphasising alignment of EEI with the principles of GIRFEC and ensuring that
the rights of children are central to the process.  
2. Objectives   
2.1 To ensure the EEI service meets the revised Core Elements 
2.2 Achieve best value and better outcomes for children. 
2.3 Ensure the EEI service aligns with the key priorities and process of GIRFEC and the
Empowering Clusters approach 
3. Strategic alignment 
4. Options  
1. Recommission Bellshill and Mossend YMCA to create an outcome-based and
sustainable service contract
2. Invite tenders for the service
3. Bring the service in-house and deliver a youth work response via CLD.  Support to be
provided by CLD staff to mentor and involve young people.
4. Cease a specific EEI service and support children and young people through other
services and interventions that are not specific to conflict with the law. 
5.  Options Appraisal plan   
The plan to review the options included the following activities:
Priority  Support all children and young people to realise their full
potential
Ambition statement
(9) Invest in early interventions, positive transitions, and
preventative approaches to improve outcomes for children
and young people
Page 211 of 253

Page 212

1. Reviewed current service provision (see section 9 below) 
2. Secured legal and HR advice
3. Engaged with YMCA Bellshill and Mossend 
4. Engaged with CLD regarding potential 
5. Completed a SWOT analysis and the scoring of options  
6.  Options Appraisal governance arrangements 
The options appraisal has been undertaken by members of the youth justice steering
group.  This group reports to SMT (Education and Families) as the final decision
making body. The options appraisal was undertaken using the council’s revised
optoins appraisal framework. 
7. Roles 
Individuals who will contribute to the Options Appraisal exercise.
Role Name 
Senior Responsible
Officer Alison Gordon
Project Manager Andrew Gillies
Facilitator (if different
from Project Manager) 
Appraisal team
members
Sharon Coats – Education and Families Manager
Marion Doran – Education and Families Manager
Iain Macauley – Health and Wellbing Lead
Xanthe Lennon – Senior Social Worker
Other stakeholders 
8. Impacts checklist 
1. Public Sector Equality Duty and Fairer Scotland Duty 
Does the Options Appraisal contain information that has an impact as a result of the
Public Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact.  
No adverse impacts are anticipated.  Whilst a change in EEI service provider may
affect continuity of service, effective contract management will ensure that there is a
smooth transition and a seamless handover 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☒ No ☒
2. Financial impact 
Does the Options Appraisal have a financial impact? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact. 
Page 212 of 253

Page 213

The current cost of the contract is £106,387.  It is estimated that costs could be
brought down to between £80-90K if brought in house.  There may be some
termination costs. 
3. HR policy impact 
Does the Options Appraisal contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact. 
Following any retendering process or bringing EEI in-house, there is potential for this
to give rise to a relevant transfer in terms of the Transfer of Undertakings (Protection
of Employment) Regulations 2006 (‘TUPE’).  Any procurement in terms of re-
tendering will make reference to this and any transfer of staff to North Lanarkshire
Council will be done in accordance with statutory requirements and good practice
guidance. 
4. Legal impact 
Does the Options Appraisal contain any legal impacts (such as general legal
matters, statutory considerations (including employment law considerations), or new
legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact. 
In the event of the commissioned EEI service currently being provided by the YMCA
Bellshill and Mosshead being retendered or brought-in house (as recommended),
the application or otherwise of TUPE will be fully considered or addressed.  The
current contract does not provide the council with a right to terminate the contract at
its own discretion so there is a risk that YMCA may object to this. 
5. Data protection impact 
Does the Options Appraisal contain or involve the processing of personal data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☒ No ☐  
A DPIA is being undertaken to assess the impacts of bringing the commissioned EEI
service in-house means from a data protection compliance perspective and if there
is anything we require to do in order to facilitate this change. 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☒ No ☐
6. Technology / Digital impact 
Does the Options Appraisal contain information that has an impact on either
technology, digital transformation, service redesign / business change processes,
data management, or connectivity / broadband / Wi-Fi?
Page 213 of 253

Page 214

Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact. 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
7. Environmental / Carbon impact 
Does the Options Appraisal contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact. 
8. Communications impact 
Does the Options Appraisal contain any information that has an impact on the
council’s communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact. 
9. Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed. 
There are some potential risks related to this options appraisal including but not
limited to:
1. risks in ceasing the service that young people’s behaviour may escalate in
seriousness.
2. There are potential reputational risks in bringing the service in house due to a
cut in funding to the local provider, YMCA. 
All risk and mitigations are noted on a register in line with the council’s project
management approach.
10. Armed Forces Covenant Duty 
Does the Options Appraisal require to take due regard of the Armed Forces
Covenant Duty (i.e. does it relate to healthcare, housing, or education services for in-
Service or ex-Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
9.  Findings of the Review 
9.1 The number of children referred to EEI in 20/21 was 186.  There was a slight
reduction in 2021/22 to 175. Over 90% of the children referred for EEI are aged 13 to
15. 
9.2 The review found that the most common disposals through the EEI process in North
Lanarkshire were either a ‘warning letter’ or continuation of current support,
Page 214 of 253

Page 215

particularly when the child or young person already had a social worker.  In consulting
with young people as part of the review, most had no idea that they had been referred
into EEI or what the focus of the work was.  In order to involve the young person and
their family better in tailoring more bespoke and holistic support, for children who
become involved in alleged offending behaviour, the EEI process is being integrated
with the GIRFEC pathway. This will involve more robust planning for children in
response to conflict with the law concerns with the people who know and have a
relationship with the child.  This is consistent with a rights respecting approach. 
9.3 Within the existing EEI process, there is an option to refer young people to a
commissioned service provided by YMCA (Bellshill and Mossend) for some specific
offence focused work.  The table below shows the numbers of children referred and
the outcomes as reported by YMCA: 
YEAR Number referred  Successful
completion
Refused
Service
2019/20 21 15 0
2020/21 22 5 7
2021/22 24 7 15 
9.4 While the number of children and young people referred to YMCA has remained
stable (albeit at only 13% of the total number of children referred to the EEI process),
the number of young people completing the programme is low.   The pandemic is a
contributory factor but not the whole picture.  There have been changes of staff and
delays in acting on referrals.  YMCA has also not been able to provide data on overall
wellbeing outcomes for young people and the views of children and young people in
relation to their experience of the service received.  A positive feature of the service
has been the pathway for young people to a befriending and mentoring scheme
known as ‘Y Empower’. 
9.5 The annual cost of the contract is £106,387 annually. This also included befriending
and mentoring for children called the Y Empower service.  Over 2021/22, YMCA were
supporting an average of 13 young people at any one time referred in Early and
Effective Intervention.  It is therefore does not represent good value for money.   
9.6 Given the data, and the plans to integrate EEI with the GIRFEC pathway, it is
imperative we  create a service that is consistent with the national vision and priorities
for a rights respecting approach to youth justice and the core elements of EEI.  This
means a responsive service that:
• Takes a holistic approach to the needs of children and young people
• Works in an integrated way with the team around the child and other
family support and targeted interventions
• Focuses on children’s strengths and capacities
• Is rights based and involves children, young people and their families 
9.7  Many of our existing services provided by Education and Families through core or
additional funding (SAC/PEF/Community Mental Health and Wellbeing Framework)
will be able to provide aspects of this service. However, there are a number of young
people referred to EEI who require additional and targeted support around
desistance, restoration and inclusion. 
10.    Findings of the Options Appraisal 
10.1 The options appraisal group looked at the options set out below and conducted a
SWOT analysis.
Page 215 of 253

Page 216

OPTION ADVANTAGES DISADVANTAGES/RISKS
1 Extend the contract with
YMCA and work on a
collaborative
commissioning exercise
to create an outcome-
based and sustainable
contract
C&P: Good Practice in
Procurement | Coalition
of Care and Support
Providers in Scotland
(ccpscotland.org). 
Will build on existing expertise
Avoid disruption to staff
through potential TUPE
arrangements
May benefit the resilience of
YMCA Bellshill and Mossend
and children and young
people receiving a service in
this area 
Need to consider how
current procurement rules
will allow for collaborative
commissioning 
2 Re-tender Potential to attract new
expertise, creativity and ideas
from other providers
Grow the community voluntary
sector locally 
3 Bring service in-house
and deliver a youth work
response via CLD. 
Support to be provided
by CLD staff to mentor
and involve young people
in their own
community/universal
provision to reduce the
risk of conflict with the
law. This will be overseen
by the CLD Development
Officer. 
A more efficient and
responsive service through
alignment with current
provision in the service and
Empowering Clusters.
Ability to flex and adapt the
service around the needs of
children if within the direct
management and control of
the service.
Enhance the evidenced
impact on children and young
people through existing youth
work provision.
Clear and accessible
pathways for young people
within youth work provision
and protecting, maintaining
relationship and support 
Moving the service from
local third sector provider
may create some
reputational risk for the
council. 
4 Cease the service A financial saving to the
council – albeit support and
interventions will need to be
undertaken in the service. 
Risk of some young
people coming into more
frequent conflict with the
law without more
specialised support in
relation to desistance. This
may increase risk of
referrals to the SCRA for
offending and demands on
more intensive resources. 
It should be noted that
already more young
people than the Scottish
average are referred to
Page 216 of 253

Page 217

SCRA on offence grounds
in North Lanarkshire.   
Options Appraisal Outcome 
10.2 With reference to the findings and the review, the table below sets out the scoring of
the options detailed above using the council’s Options Appriasal Framework.   
Options   
Weighting 1 2 3 4 
Policy Fit 30% 1.6 3.6 4.3 1 
Cost/Savings 20% 1 2 2 2.3 
Performance 20% 1.6 3.6 3.6 1 
Operational Specific – GIRFEC
based EEI approach
10% 2 2.2 4 1 
100%     
10.3 The outcome of the options appraisal is to bring the EEI service in-house and locate it
within the Community Learning and Development service.   
10.4 This outcome will have the advantage of ensuring integration together with the
existing universal and additional provision to ensure good pathways of support for
young people by workers with robust local knowledge.  During the review process
young people also told us they valued the CLD service and there is accordingly the
potential to co-design this new approach to EEI. 
Page 217 of 253

Page 218

Page 218 of 253

Page 219

North Lanarkshire Council
Report
Education, Children, and Families Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  JO’N/GMcL Date 28/02/23 
Strategic Performance Framework - latest performance results for
Education 
From  Janie O’Neill, Chief Officer (Education - South)
Gerard McLaughlin, Chief Officer (Education - North)  
E-mail ONeillJa@northlan.gov.uk
McLaughlinG@northlan.gov.uk  Telephone 
Executive Summary
Members will recall considering the latest results for the Local Government Benchmarking
Framework (LGBF) indicators at the Panel meeting in September 2019 and thereafter
establishing a programme of scrutiny based on key areas of performance. Notably, several
of the identified measures relate to performance information collected through external
HMIE inspection processes. 
However, the emergence of the coronavirus pandemic in November 2019 had a significant
impact on the Service’s internal and external (HMIE) scrutiny processes with routine HMIe
inspections being paused from March 2020 to till August 2022.   During this period,
inspectors only engaged with establishments who were awaiting further engagement. This
had a significant impact on data collected in relation to the performance data identified in
this report. Furthermore, the terminology used in relation to some of the key indicators has
changed.  Updates are noted in explanatory notes on the datasheets. 
The Covid pandemic also had a significant impact on National and Local exam processes,
with new processes being introduced. There were also changes to Achievement of a Level
data (ACEL) collection processes across Scotland.  Therefore, data should be interpreted
in this context.   
Notwithstanding this, the performance benchmarking indicators are a useful tool to inform
improvements to services and outcomes and in this respect the LGBF indicators are
designed to provide initial information about a service. It is by reviewing and investigating
this information further, and entering into discussions with other councils, that lessons can
be learned, and improvements identified. 
Using the latest dataset, this report provides the Education, Children and Families
committee with a summary of the analysis to identify which indicators and service areas
show improved performance over time and are favourable when compared to the national
average. This is intended to assist committee members to identify and prioritise which
service areas they wish to review and scrutinise further as part of their 2022-23 programme
of scrutiny. 
AGENDA ITEM 12
Page 219 of 253

Page 220

1. Background 
1.1 There are six inter-related strategic frameworks which are key to assessing the success
of The Plan for North Lanarkshire and monitoring delivery towards achieving the overall
vision by ensuring each stage is appropriately planned, guided, implemented, and
governed.   
1.2 The six frameworks focus on ensuring a corporate one council approach in respect of
Policy, Governance, Performance, Self-Evaluation, Project Management, and
Demonstrating Improved Outcomes for Communities.   
1.3 The Strategic Performance Framework comprises performance measurement at three
levels (as per the diagram on the right).  This aims to collectively provide an overview
of performance to help understand the impact of council activities on improving services
and outcomes for the people and communities of North Lanarkshire.  The measures in
this Framework allow for day to day activities, and progress towards achieving the long-
term vision set out in The Plan for North Lanarkshire, to be regularly monitored,
reported, assessed, and scrutinised.   
1.4 The Strategic Performance Framework is aligned to the Accounts Commission 
statutory direction which places a requirement on councils to report a range of
information in terms of (1) improving local services and outcomes, and (2)
demonstrating Best Value.  Key points of note in this respect are that the Accounts
Commission also expect to see: 
(a) A balance in reporting areas of improvement that have been achieved and not
achieved.
(b) Reporting that is undertaken in a timely manner.
(c) Easy access to performance information for all citizens and communities.
Recommendations 
It is recommended that the Education, Children, and Families Committee: 
(1) Review the high-level performance overview presented in Appendix 1, and the
supporting data contained within the linked Excel spreadsheet, and identify where
further information is required to understand or investigate performance further. 
The Plan for North Lanarkshire
Priority  Support all children and young people to realise their full potential
Ambition statement (6) Raise attainment and skills for learning, life, and work to
enhance opportunities and choices 
(7) Enhance collaborative working to maximise support and ensure
all our children and young people are included, supported, and safe 
(8) Engage children and families in early learning and childcare
programmes and making positive transitions to school 
(9) Invest in early interventions, positive transitions, and
preventative approaches to improve outcomes for children and
young people 
(10) Engage with children, young people, parents, carers, and
families to help all children and young people reach their full
potential
Page 220 of 253

Page 221

1.5 A Performance Reporting Schedule supports the timely submission of a range of
performance information that facilitates Elected Members and senior management to
undertake regular performance reviews that inform scrutiny, challenge, and decision
making processes.  This Schedule, endorsed by the Audit and Scrutiny Panel in
February 2023, includes Chief Officer’s individual six monthly Performance Reviews at
Service Committees in line with the Strategic Performance Framework. 
1.6 This report therefore presents the Education, Children, and Families Committee with
the latest performance results for Education for Members’ further review and scrutiny. 
2. Strategic Performance Framework 
Education, Children, and Families Committee responsibilities 
2.1 In line with the terms of reference outlined in the Scheme of Administration, the
Education, Children, and Families Committee is responsible for monitoring and
reviewing performance information for the following Ambition Statements from The
Plan for North Lanarkshire: 
6.  Raise attainment and skills for learning, life, and work to enhance opportunities
and choices
7.  Enhance collaborative working to maximise support and ensure all our children
and young people are included, supported, and safe
8.  Engage children and families in early learning and childcare programmes and
making positive transitions to school
9.  Invest in early interventions, positive transitions, and preventative approaches
to improve outcomes for children and young people
10.  Engage with children, young people, parents, carers, and families to help all
children and young people reach their full potential 
2.2 The high-level performance overview in Appendix 1 presents Members with a summary
of the latest results for each performance indicator within the remit of the Chief Officer
(Education). 
2.3 The information in Appendix 1 comprises the following: 
• An ideal direction arrow - this indicates whether a higher or lower figure is the
preferred direction of travel.   
• Measurement unit - for example whether the result is a %, a number, a unit cost
(in £), or a ratio.
• Performance results for the last four financial years (depending on availability of
data) along with the latest year’s target and corresponding RAG status (for
indicators where it is appropriate to set targets).   
• The most recent monthly or quarterly results, along with the corresponding target
and RAG status.  Note the inclusion of this information is dependent on the
measurement frequency of the indicator and availability of data as at the time of
reporting. 
 A higher figure is better
 A lower figure is better
Key to RAG status 
Performance is on target and/or within acceptable thresholds 
Performance does not meet target and is outwith acceptable thresholds 
Performance surpasses the target and exceeds expectations
Page 221 of 253

Page 222

• A trend graph - this captures the direction of travel achieved over the four financial
years and includes the most recent monthly or quarterly results where available.
• Comments - narrative summarising the current position and providing an
explanation for any significant variations in performance.  Where applicable, this
narrative also highlights the effect of the pandemic on service delivery, e.g. any
increase or decrease in the volume of transactions or enquiries processed. 
2.4 A large volume of data supports the high-level performance overview in Appendix 1. 
This is outlined in the latest performance results for Education Excel spreadsheet
which is available through the following link for Members to carry out a deep dive and
review and scrutinise each performance indicator further.  The Menu on the second tab
of the spreadsheet contains built in hyperlinks that automatically take the user to a tab
for each performance indicator and therefore provides a useful navigation aid to review
the contents of the file. 
• Latest performance results for Education.xlsx 
Current context 
2.5 The programme of routine HMIe inspections was paused in March 2020 in response to
the COVID-19 pandemic. Prior to cessation, 13 establishment inspections were
inspected. 4 establishments were identified as requiring a re-inspection visit.  Notably,
1 of these identified establishment only required a revisit in relation to its Early
Years/Early Level provision, although this is not reflected in the performance indicator.
The primary provision within this establishment was graded as Good across all 4 quality
indicators in the school. 
When inspection activity resumed in September 2021, inspections focused on
engagement with schools awaiting further inspection or thematic engagement 
designed to collect and share good practice. Therefore, inspections noted during
academic session 2020/21 and 2021/2022 only include establishments who were
awaiting re-inspection. This skews the data as it is not a proportionate representation
of all establishments. Of the 10 inspections, noted in 2021/2022, 6 have now been
completely signed off, 2 have partial sign off with the recommendation that the authority
provide a progress update and 2 are still engaging with inspectors. 
Disruption to the HMIE inspection process, as a result of the Covid 19 pandemic, has
clearly impacted on the scope of our inspection performance data and as such we ask
that it is interpreted and understood in this context. This includes indicators in relation
to HMIe grades and parental satisfaction data which is derived from HMIe
questionnaire results. 
Since inspections resumed in August 2022, 7 establishments have been inspected with
100% receiving positive reports, using current criteria which categorises a grading of
satisfactory or above as positive. Only 4 inspections reports have been published to
date but overall trends indicate positive impact of strategies employed by the Service
to support continuous improvement. 
Notably, from session 2022-23, we will further challenge ourselves by adapting the
criteria underpinning the performance indicator- % positive HMIE reports and only
categorise establishments graded good or above as positive.  This will have obvious
implications on comparing trends over time but reflects our increased expectations and
drive to improve outcomes for children and families. Using this new measure, over the
26 quality indicators considered during inspections for session 2022-23, 89% have
Page 222 of 253

Page 223

achieved good or above gradings. (Using the previous measure – 100% achieved
positive inspection gradings.) 
In summary, analysis of all inspection gradings awarded to NLC schools over the 5-
year improvement cycle shows the following high level profile and conveys the urgency
of recent improvement against statutory measures: 
• Pre-covid: 61% good+ inspection gradings (106 grades awarded)
• 2022 – 2023: 89% good+ inspection gradings (26 grades awarded). 
Recent performance highlights 
2.6 Despite challenges presented in collating robust data against the identified
performance benchmarks, the data evidences improvements including those
highlighted below. 
The number of pupils (%) achieving 5 or more awards at SCQF Level 5 or higher has
risen from 65% in 2020/21 to 67% in 2021/22. 
The percentage of P1, P4, P7 pupils combined, achieving expected Curriculum for
Excellence level in literacy continues to improve – rising from 68.6% in session 2020/21
to 72.2% in 2021/22. 
We have also noted an increase in the percentage of P1, P4, P7 pupils combined,
achieving expected Curriculum for Excellence level in numeracy increasing from 76.1%
in 2020/21 to 79.4% in 2021/22. 
At the Broad General Education stage (BGE), the data also shows a reduction in the
attainment gap in literacy reducing from 22.4 in 20/21 to 19.0 in 21/22. The attainment
gap in numeracy has also decreased, reducing from 20.7 in 20/21 to 16.6 in 21/22. 
We are also making progress towards closing the poverty related attainment gap at the
Senior Phase recording an increase in the % of pupils living in the 20% most deprived
areas gaining 5 or more awards at SCQF Level 5 or higher, with attainment increasing
by 1% to 52%. This is the highest level recorded to date. 
The percentage of funded early years provisions graded good or better has also
continued to rise increasing from 90.1% in 2020/21 to 91.8% in 2021-22. The quality
rating of Early Years establishments has remained positive, above 90%.
Attendance for looked after children has increased from 78.6 in 2018-19 to 83.0 in
2020-21. 
Areas of performance requiring improvement 
2.7 As explained above, changes to the HMIe Inspection process impacted on our ability
to gather a full dataset in relation to identified performance indicators.  However,
Education, Children and Families recognise that this was only a contributing factor and
have identified the need to forensically monitor the indicators identified below and to
implement refreshed quality assurance procedures, to secure immediate
improvements. 
Page 223 of 253

Page 224

Three of the identified areas focus on levels of parental satisfaction for 2020/21; 
• Percentage of parents agree or strongly agree that they receive helpful, regular
feedback about how their child is learning and developing (71.4 %)
• Percentage of parents agree or strongly agree that overall they are satisfied with
the school (60.4%)
• Percentage of parents who agree or strongly agree that the school is well led and
managed (67.5%). 
Whilst local data indicates that these figures do not represent the view of the wider
parental body, and that there is likely to be a direct correlation with the increased
number of negative inspection results, the Service will track and monitor internal and
external parental feedback to support improvement.   Implementation of the refreshed
quality assurance processes will facilitate monitoring at individual establishment level. 
Work to develop a new parental engagement strategy will also allow for focused
feedback from parents/carers. 
Data and internal self-evaluation processes highlight the need to improve pupil
attendance rates.  The rate for session 2020-21 is 89.8%.  This area has been identified
as a key priority across the Service.  An integrated cluster approach has been
established wherein attendance data is monitored and shared regularly with key
stakeholders to allow early identification and support for individuals whose attendance
is causing concerns.  This early identification and intervention will support improved
attendance levels.  The upcoming deployment of family engagement workers will
further strengthen this approach. 
Next steps 
2.8 As noted in paragraph 1.5, the Strategic Performance Framework is supported by a
Performance Reporting Schedule.  This sets out the arrangements for service,
statutory, and Strategic Performance Framework reporting to committee.  In this
respect the Education, Children, and Families Committee can expect to receive the
following in respect of insert Education during 2023/24. 
Report Description Committee
cycle
Annual
Standards
and Quality
report 
This annual report serves 3 purposes: 
(i) To provide all stakeholders and the public with the
performance information across the 6 NIF drivers and
against improvement priorities to measure
performance in improving educational outcomes for
young people.
(ii) To meet the statutory requirement under the
Standards in Schools etc. Act 2000 (as amended by
the Education (Scotland) Act 2016). 
(iii) To provide the information required to contribute
to the Scottish Government’s annual report on the 6
NIF drivers for improvement.
Cycle 3 in
2023
Scottish
Attainment
Challenge
(SAC) 
This report updates on progress made in the
Attainment Challenge during the latest session, and
gives detail on areas of improvement within literacy,
numeracy, and health and wellbeing and presents the
end of academic year report as submitted to the
Cycle 3 in
2023
Page 224 of 253

Page 225

Scottish Government. 
Moving forward, the SAC report will now be referred
to as the SEF (Strategic Equity Fund). 
3. Measures of success 
3.1  Measures of success include:
• Regular oversight and monitoring of performance across the organisation to gain
assurances in terms of governance and accountability.
• Regular review and challenge processes to scrutinise the performance of the
council to ensure effective use of resources and that resources are directed in
accordance with agreed policy and according to priorities, while ensuring sound
decision making and clear accountability for the use of resources in achieving
improved outcomes for service users and the local community.  
• Performance monitoring, management, and reporting arrangements that support
the demonstration of improved performance in local services and outcomes, and
the delivery of Best Value. 
4. Supporting documentation 
4.1 Appendix 1 -  High-level performance overview 
Janie O’Neill
Gerard McLaughlin
Chief Officers (Education - North and South) 
Page 225 of 253

Page 226

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 226 of 253

Page 227

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 227 of 253

Page 228

Appendix 1
Education
High-level performance overview - as at January 2023 
Page 228 of 253

Page 229

Page 229 of 253

Page 230

Page 230 of 253

Page 231

Indicator id ideal
direction
unit of
measurem
ent
2018/19 2019/20 2020/21 2021/22 2021/22
target
2021/22 RAG
status 2022/23 ytd 2022/23
target
2022/23 RAG
status trend comments
Attendance at school  - %
attendance for all pupils, primary
and secondary school
CHN19a
higher
figure is
better
% 91.2 89.8 only measured
bienially
Attendance in NL schools have shown a small gradual decrease over
recent years which is at a slightly greater rate than the similar decline in
national and family group average.  The latest results show attendance in
NL schools of 89.8% compared to the national average of 92% and the
family group average of 91.2%.
Attendance at school  - %
attendance for looked after
children
CHN19b
higher
figure is
better
% 78.6 83.0 only measured
bienially
The latest results for attendance in NL schools for looked after children has
shown an improvement to 83%.  This trend has followed the national and
family groups averages, although NL figures remain lower than the national
average of 87.9% and the family group average of 86.6%.
Attendance at school  - %
attendance for disabled children Pi045
higher
figure is
better
% 87.5 89.2 only measured
bienially
The council has also recently started to measure attendance for disabled
children; this shows an improvement in attendance from 87.5 to 89.2 over
the period of the data collected.  National comaprison are not available for
this indicator.
Exclusions from school, all pupils
- exclusion rate per 1,000 pupils CHN20a
lower
figure is
better
number 35.0 15.3 only measured
bienially
Exclusion rates in NLs schools have shown significant improvement in
recent years, with the latest results (15.3 per 1,000 pupils) closing the gap
with the national average (11.9) and the family group average (13.7).  A
range of service interventions have improved supports for NLs pupils in
recent years, this has ensured that resources and decision making are
devolved to where needs arise.
Exclusions from school, looked
after children - exclusion rate per
1,000 pupils
CHN20b
lower
figure is
better
number 293.3 95.7 only measured
bienially
Exclusion rates in NLs schools for looked after children have also shown
significant improvement in recent years, with the latest results (95.7 per
1,000 pupils) closing the gap with the national average (77.8) and being
considerably lower than the family group average (127.2).  A range of
service interventions have improved supports for NLs pupils in recent
years, this has ensured that resources and decision making are devolved
to where needs arise.
Exclusions from school for
children from Additional Support
Needs (ASN) schools - exclusion
rate per 1,000 pupils
Pi054
lower
figure is
better
number 104.7 192.0 only measured
bienially
The council has also recently started to measure exclusion rates for
disabled children; this shows an increase from 104.7 to 192 over the
period of the data collected.  National comaprison are not available for this
indicator.
HMIe inspection reports, early
years - % of positive reports i034
higher
figure is
better
% 80.0 71.4 33.3 100.0 100.0 Green only measured
annually
Inspections of early years establishments remained at 100% in 2021/22
with 5 being inspected and all 5 receiving a positive report.  The national
inspection programme was impacted on by the pandemic in 2019/20 and
2020/21.
HMIe inspection reports, schools
- % of positive reports i030
higher
figure is
better
% 92.3 69.2 33.3 80.0 100.0 Red only measured
annually
Inspections of schools achieved 80% in 2021/22 with 10 being inspected
and 8 receiving a positive report.  The national inspection programme was
impacted on by the pandemic in 2019/20 and 2020/21.
Quality ratings of early year
privision - % funded early years
provision which is graded good
or better
CHN18
higher
figure is
better
% 89.5 90.4 90.1 91.8 only measured
annually
The latest results for the quality of early years provision following
inspections by the Care Inspectorate found that 91.8% of funded early
years provision in NL was graded good or better in 2021/22.  This is an
improvement on previous years and is higher than national average
gradings (90.9%) and family group average gradings (89.5%).
0.0
20.0
40.0
60.0
80.0
100.0
2018/19 2020/21
0.0
20.0
40.0
60.0
80.0
100.0
2018/19 2020/21
0.0
20.0
40.0
60.0
80.0
100.0
2018/19 2020/21
0.0
100.0
200.0
300.0
2018/19 2020/21
0.0
20.0
40.0
60.0
80.0
100.0
2018/19 2019/20 2020/21 2021/22
0.0
20.0
40.0
60.0
80.0
100.0
2018/19 2020/21
0.0
100.0
200.0
300.0
2018/19 2019/20
0.0
20.0
40.0
60.0
80.0
100.0
2018/19 2019/20 2020/21 2021/22
0.0
20.0
40.0
60.0
80.0
100.0
2018/19 2019/20 2020/21 2021/22
Page 231 of 253

Page 232

Page 232 of 253

Page 233

North Lanarkshire Council
Report
Education, Children and Families Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref: DB / TO’H Date 28/02/23 
Revenue Budget Monitoring Report 
From: Derek Brown (Deputy Chief Executive) 
E-mail: BrownD@northlan.gov.uk  Telephone 01698 302 517 
Executive Summary 
This report provides a summary of the financial performance of the Education, Children
and Families Service for the period 1 April 2022 to 6 January 2023 (Period 10).  The report
highlights the projected outturn position as at 31 March 2023, including explanations of
major variances in accordance with North Lanarkshire Council’s approved Financial
Regulations.   
The Education, Children and Families Service has a Net Revenue Budget of £460.192m
for the 2022/23 financial year. 
Incorporated within the Revenue Budget are approved savings totalling £6.830m.  It is
anticipated that £3.969m (58.11%) of these savings will be realised during the current
financial year. 
The Service is currently forecasting an overspend of £3.563m for the current financial year. 
The overspend is primarily the result of in-year contractual inflation uplifts. 
Recommendations
It is recommended that the Education, Children and Families Committee: 
(1) Review the financial position of the Education, Children and Families revenue budget 
(2) Review the contents of the report 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning  
AGENDA ITEM 13
Page 233 of 253

Page 234

1. Background 
1.1. North Lanarkshire Council’s approved Financial Regulations require Deputy Chief
Executives and Heads of Service to remain within their approved budgetary provision,
and to report all significant deviations - defined as the higher of £100,000 or 5% - within
their budget monitoring reports. Where significant deviations are identified, officers
must provide explanatory commentary, outline the action required to rectify such
deviations and where relevant, must also highlight the impact this has on other budget
headings. 
2. Report 
2.1. Summary of Financial Position 
2.1.1. North Lanarkshire Council approved its General Fund Revenue Budget on 17 February
2022 of which £465.120m (52.4%) represented the approved Net Revenue Budget for
Education, Children and Families. During 2022/23 there has been a net budget
reduction of £4.928m to £460.192m following operational realignments between
Council Services.  These movements include the transfer of staff groups to the Chief
Executives Service including the Administrative & Finance Assistant (AFA) team and
Technicians Service (£2.994m) along with legislative changes in respect of employers’
national insurance contributions (£1.859m). 
2.1.2. The Service is forecasting a net overspend of £3.563m to the end of the financial year. 
Further analysis of major variances is provided within Section 2.2 of this report. 
2.1.3. Included within the net overspend projection are significant, in-year, inflationary cost
pressures.  There are material inflationary pressures linked to increases in utility costs
across the Service’s educational and Active & Creative Communities estate (£4.983m),
coupled with further increases to mainstream and ASN pupil transport contracts
(£3.651m).  As part of the Council’s financial planning process, resources were
previously earmarked following the closure of the 2021/22 annual accounts to help
offset the projected inflationary pressures faced by Services during the current financial
year. The consolidated position summarising in-year inflationary pressures and funding
options across each Service will be presented in the Council’s summary budget
monitoring report. 
2.1.4. In the period up to 6 January 2023 several teacher trade union staff groups had
participated in strike days and this industrial dispute remains unresolved. At the close
of Period 10 pay deductions totalling £0.657m have been accrued in relation to action
taken on 24 November and 7 December 2022. The impact of the teacher’s strike is not
included in this report because school DSM budgets will be adjusted on an ongoing
and equivalent basis through to the cessation of the industrial action.  However, similar
to Section 2.1.3 above the financial impact of the strike days will be reflected in the
Council’s summary budget monitoring report. 
2.1.5. The current 2022/23 budget incorporates £6.830m of savings previously approved by
the Council on 17 February 2022. Further information regarding particularly challenging
savings, along with associated management actions and replacement in-year savings,
are included within this report at Appendix 5.  
Page 234 of 253

Page 235

2.2. Analysis of Significant Variances 
2.2.1. The Service has a total employee budget of £374.081m and currently anticipates a
projected underspend of £6.914m. The underspend reflects actual and projected
vacancies, along with the roll out of finalised HQ, cluster, and school staffing structures. 
2.2.2. Service employee budgets are partly devolved to establishments per the Devolved
School Management (DSM) scheme, with the remaining budgets held at HQ level. 
Under the DSM scheme devolved staffing budgets for teaching and non-teaching posts
are delegated to Head Teacher management.  Establishments receive allocations
based on agreed formulas and distribution methods. Devolved staffing budgets for
financial year 2022/23 total £217.036m. 
2.2.3. The Service is anticipating an overspend of £5.586m within Property Costs
predominantly linked to increased costs in relation to utilities / energy inflation
(£5.300m) along with other minor overspends across the Service (£0.286m). 
2.2.4. The Service is anticipating an underspend of £1.822m within Supplies & Services
primarily due to synergies with external funding, management action and the
curtailment of non-essential expenditure within Cluster / HQ support (£1.264m), Active
and Creative Communities (£0.439m), HQ funded support to the ASN sector
(£0.134m), offset by other minor overspends across the Service (£0.015m). 
2.2.5. The Service is anticipating an overspend of £5.513m within Transport and Plant which
reflects ongoing demand pressures within ASN transport (£2.678m) and increases to
mainstream transport contract rates (£2.810m) along with minor overspends across the
Service (£0.025m). 
2.2.6. The Service is anticipating an underspend of £0.012m within Administration Costs
primarily due to management action and the curtailment of non-essential expenditure. 
2.2.7. The Service is anticipating an overspend of £0.992m within Payments to Other Bodies
primarily in relation to demand led external placements within Family Fostering and
Kinship awards (£0.579m), ASN service provision (£0.329m), along with other minor
overspends across the Service (£0.083m) as outlined in Appendix 3. 
2.2.8. The Service is anticipating an underspend of £0.180m within Transfer Payments in
relation to reduced demand for childrens’ support services and applications for clothing
grants. 
2.2.9. The Service is anticipating an underspend of £0.826m within Other Expenditure
primarily due to the curtailment of non-essential expenditure within Cluster / HQ support
(£0.845m) partially offset by minor overspends within other Service areas (£0.019m). 
2.2.10. The Service is anticipating an under recovery of income of £1.227m in relation to actual
membership and visitor’s fees for Active and Creative Communities (£1.482m) being
lower than the budget target, coupled with reduced cross-boundary ASN placements
within NLC establishments (£0.366m), partially offset by a HRA funding contribution to
the Tackling Poverty Team along with various minor over recoveries across the Service
(£0.622m).  
Page 235 of 253

Page 236

2.3. Earmarked and One-Off Resources 
2.3.1. In finalising North Lanarkshire Council’s annual accounts to 31 March 2022, the
Education, Children and Families Service was given approval to earmark £104.983m
of resources represented by £85.701m (Non-Covid) and £19.282m (Covid) to fund key
projects and initiatives.  Most of this reserve (£54.175m) is earmarked for existing
school building contractual commitments.  Other specific reserves include Pupil Equity
Fund (PEF) carry forwards, Devolved School Management (DSM) carry forwards, and
ring-fenced 1140 Hours grant.  Future monitoring reports will provide updates on use
of these reserves during 2022/23 as outlined in Appendix 4. 
2.4. 2022/23 Budget Savings and Growth 
2.4.1. The Council previously approved total savings of £16.484m during 2022/23.  The initial
Education, Children and Families Service savings target for 2022/23 was £6.830m. 
The Service uses a variety of information, records, and processes to monitor
achievement of its approved budget savings. As at Period 10, it is anticipated that
£3.969m (58.11%) of the approved savings target will be realised in the current financial
year as outlined in Appendix 5. 
2.4.2. The unachieved savings of £2.861m have predominantly arisen due to temporary
operational timing delays, the phased introduction of new staffing structures,
consideration of the school academic calendar, and impact of Covid-19.  In year
management action has been taken to address this funding gap and the savings are
expected to be fully achieved during future financial years. 
2.4.3. As part of the Council’s approved General Fund Revenue Budget for 2022/23, the
Education, Children & Families Service were allocated £3.470m towards several one-
off investments. Further information on use of these one-off investment allocations
during 2022/23 is provided in Appendix 6. 
2.5. Management Actions 
2.5.1. Management will continue to review and implement actions through to financial year
end with the aim of minimising the projected overspend position. These actions will
include: 
a) Vacancy management
b) Creating efficiencies through use of grant / external funding
c) Curtailment of non-essential expenditure
d) Application of earmarked reserves to offset one-off cost pressures   
3. Measures of success 
3.1. The Service operates within approved budget resources.     
Page 236 of 253

Page 237

4. Supporting documentation 
4.1. Appendix 1: Objective Analysis
Appendix 2: Subjective Analysis
Appendix 3: Payments to Other Bodies
Appendix 4: Status of Earmarked Reserves
Appendix 5: Savings
Appendix 6: ‘Recover NL’ One-Off Investments 
Derek Brown
Deputy Chief Executive 
Page 237 of 253

Page 238

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
As stated within the main body of the report 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Page 238 of 253

Page 239

Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
The approach outlined in this report supports the Council’s actions in managing
financial sustainability and financial management risks.  Financial pressures and
risks are reviewed on a regular basis by the Service Management Team, CMT and
Committee. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 239 of 253

Page 240

APPENDIX 1
[1] [2] [3] [5] [6] [8] [9] [10]
Early Years 25,522,277 25,522,277 0 31,807,284 31,807,284 0 0.0% 0 Balanced Budget
Primary Schools 92,377,292 92,377,292 0 136,209,480 136,209,480 0 0.0% 0 Balanced Budget
Secondary Schools 91,890,348 91,890,348 0 127,846,098 127,846,098 0 0.0% 0 Balanced Budget
Special Schools 15,163,051 15,163,051 0 20,651,426 20,651,426 0 0.0% 0 Balanced Budget
Education Service Delivery 16,001,265 17,884,986 (1,883,721) ADV 71,465,354 74,275,149 (2,809,795) ADV (3.9%) 1,800,797 Overspends within transportation costs linked to ASN
service delivery and contract inflation pressures
partially offset by underspends contained within
employee costs budgets.
Children & Families 26,159,282 25,969,595 189,687 FAV 36,567,528 36,278,319 289,209 FAV 0.8% (617,618) Underspends contained with employee cost budgets
partially offset by overspends within Family
Placements, External Fostering & Kinship
Placements
Justice Services (105,797) (90,080) (15,717) ADV 73,431 93,863 (20,432) ADV (27.8%) (328,247) Minor overspend
Active & Creative Communities 8,636,851 9,791,939 (1,155,088) ADV 25,037,035 26,367,925 (1,330,890) ADV (5.3%) (370,469) Overspends linked to increased utitlities costs along
with reduced income in relation to membership fees
and site visitors a result of Covid partially offset by
underspends contained within employee cost
budgets.
Employability 5,545,624 5,515,937 29,687 FAV 3,906,759 3,876,032 30,727 FAV 0.8% 45,609 Minor underspend
Community Learning 3,706,268 3,579,751 126,517 FAV 4,645,059 4,345,898 299,161 FAV 6.4% 517,899 Underspends contained within employee cost
budgets with over-recovery of external funding.
Welfare 1,616,015 1,624,917 (8,902) ADV 1,982,435 2,003,270 (20,835) ADV (1.1%) 533,169 Minor overspend
NET EXPENDITURE 286,512,476 289,230,013 (2,717,537) ADV 460,191,889 463,754,744 (3,562,855) ADV (0.8%) 1,581,140 As stated above
DIVISION OF SERVICE BUDGET TO
DATE
ACTUAL TO
DATE YEAR TO DATE VARIANCE ANNUAL
BUDGET
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Objective Analysis
Period 10 (01 April 2022 - 06 January 2023)
Education, Children & Families
[4] [7]
PROJECTED
OUT-TURN
PROJECTED OUT-TURN
VARIANCE % PERIOD
MOVEMENT ANALYSIS
Page 240 of 253

Page 241

APPENDIX 2
[1] [2] [3] [5] [6] [8] [9] [10]
EMPLOYEE COSTS 277,200,813 270,414,503 6,786,310 FAV 374,081,276 367,166,958 6,914,318 FAV 1.9% 2,059,149 Underspend primarily due to phasing of external
funding with recruitment reflecting academic not
financial year along with vacancy management.
PROPERTY COSTS 32,021,028 36,543,642 (4,522,614) ADV 66,191,398 71,777,539 (5,586,141) ADV (8.4%) 22,349 Impact of projected increased utitlity costs across the
school estate and Active and Creative Communities
and other minor overspends across the Service.
SUPPLIES & SERVICES 10,584,431 10,089,507 494,924 FAV 26,416,538 24,594,564 1,821,974 FAV 6.9% 267,884 Management action, curtailment of non-essential
expenditure and synergies with external funding to
support increased costs and demands within other
areas of the Service
TRANSPORT & PLANT 8,458,302 12,592,369 (4,134,067) ADV 13,902,719 19,415,566 (5,512,847) ADV (39.7%) (119,121) Overspend in relation to ongoing cost pressures
linked to ASN service delivery and observed market
increases for mainstream transport contracts.
ADMINISTRATION COSTS 3,394,906 3,348,401 46,505 FAV 7,139,355 7,127,318 12,037 FAV 0.2% (358,448) Management action, curtailment of non-essential
expenditure and synergies with external funding to
support increased costs and demands within other
areas of the Service
PAYMENTS TO OTHER BODIES 29,392,956 30,150,571 (757,615) ADV 43,126,125 44,117,741 (991,616) ADV (2.3%) 133,977 Overspend in relation to external ASN placements
and external fostering / kinship placements.
TRANSFER PAYMENTS 2,938,359 2,831,264 107,095 FAV 4,492,512 4,312,512 180,000 FAV 4.0% 180,000 Underspend in relation to clothing grant applications
and children's support services
CAPITAL FINANCING COSTS 1,385,300 1,385,300 0 43,710,875 43,710,875 0 0.0% 0 Balanced budget
REVENUE FINANCING COSTS 0 0 0 0 0 0 0.0% 0 Balanced budget
OTHER EXPENDITURE 6,181,587 6,201,991 (20,404) ADV 27,077,490 26,251,517 825,973 FAV 3.1% (1,161,934) Management action, curtailment of non-essential
expenditure and synergies with external funding to
support increased costs and demands within other
areas of the Service
TOTAL EXPENDITURE 371,557,682 373,557,548 (1,999,866) ADV 606,138,288 608,474,590 (2,336,302) ADV (0.4%) 1,023,856 As stated above
INCOME (85,045,206) (84,327,535) (717,671) ADV (145,946,399) (144,719,846) (1,226,553) ADV 0.8% 557,284 Reduced income in relation to Active and Creative
Communities membership fees and site visitors and
fewer cross-boundary ASN placements within NLC
NET EXPENDITURE 286,512,476 289,230,013 (2,717,537) ADV 460,191,889 463,754,744 (3,562,855) ADV (0.8%) 1,581,140 As stated above
CATEGORY BUDGET TO
DATE
ACTUAL TO
DATE YEAR TO DATE VARIANCE ANNUAL
BUDGET
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Subjective Analysis
Period 10 (01 April 2022 - 06 January 2023)
Education, Children & Families
[4] [7]
PROJECTED
OUT-TURN
PROJECTED OUT-TURN
VARIANCE % PERIOD
MOVEMENT ANALYSIS
Page 241 of 253

Page 242

APPENDIX 3
[1] [2] [3] [5] [6] [8] [9] [10]
GENERAL PTOBS 6,155,221 6,198,871 (43,651) ADV 10,101,273 10,174,173 (72,900) ADV (0.7%) (3,797) Minor overspend
ADDITIONAL SUPPORT NEEDS 3,468,217 3,721,352 (253,134) ADV 7,738,919 8,067,993 (329,074) ADV (4.3%) 413,869 Increased costs in relation to out of authority ASN
provision for day placements, residential and secure
accommodation
EARLY YEARS 11,531,766 11,531,766 0 13,894,454 13,894,454 0 0.0% 0 Balanced budget
VOLUNTARY ORGANISATIONS 663,451 669,767 (6,316) ADV 1,114,610 1,124,974 (10,364) ADV (0.9%) 0 Minor overspend
FAMILY PLACEMENTS 7,522,394 7,976,909 (454,515) ADV 10,054,583 10,633,861 (579,278) ADV (5.8%) (276,095) Impact of increased costs as result of contract
inflation pressures along with continued demand
within this service area
CHILDRENS SERVICES - GENERAL 51,907 51,907 0 222,286 222,286 0 0.0% 0 Balanced budget
TOTAL EXPENDITURE 29,392,956 30,150,571 (757,616) ADV 43,126,125 44,117,741 (991,616) ADV (2.3%) 133,977 As stated above
[4] [7]
PROJECTED
OUT-TURN
PROJECTED OUT-TURN
VARIANCE % PERIOD
MOVEMENT ANALYSIS
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Payments to Other Bodies
Period 10 (01 April 2022 - 06 January 2023)
Education, Children & Families
CATEGORY BUDGET TO
DATE
ACTUAL TO
DATE
YEAR TO DATE
VARIANCE
ANNUAL
BUDGET
Page 242 of 253

Page 243

APPENDIX 4
Value %
Service Specific Earmarked Reserves:
School Carry Forward / Support 5,331,815 0 5,331,815 3,285,329 5,331,815 100.0% 0 5,331,815
PEF Carry Forward 5,122,022 0 5,122,022 3,940,017 5,122,022 100.0% 0 5,122,022
Seemis Replacement Project 36,399 0 36,399 27,999 36,399 100.0% 0 36,399
Early Learning and Childcare 14,248,598 (6,759,000) 7,489,598 5,227,456 7,489,598 100.0% 0 7,489,598
CYPMHW Framework 18,881 0 18,881 0 18,881 100.0% 0 18,881
Shotts Prison 46,844 0 46,844 0 46,844 100.0% 0 46,844
School Contractual Obligations 54,174,844 (54,174,844) 0 0 0 0.0% 0 0
Asylum Seeker 32,333 0 32,333 24,872 32,333 100.0% 0 32,333
Whole Family Wellbeing 233,272 0 233,272 0 233,272 100.0% 0 233,272
Student Social Worker Resumption Funding from Universities 21,380 0 21,380 0 21,380 100.0% 0 21,380
ESF Match Funding - Pipeline 406,136 0 406,136 312,412 406,136 100.0% 0 406,136
Active & Creative Communities 2,568,303 0 2,568,303 2,073,078 2,568,303 100.0% 0 2,568,303
Youth Guarantee Funding 2,908,913 0 2,908,913 856,169 2,908,913 100.0% 0 2,908,913
Legacy Flexible Fund 67,157 0 67,157 67,157 67,157 100.0% 0 67,157
DigitalNL Savings 310,825 0 310,825 310,825 310,825 100.0% 0 310,825
Roots Opportunity for Growth (LAA Children) 173,208 0 173,208 27,500 173,208 100.0% 0 173,208
SUB-TOTAL (Non-Covid) 85,700,930 (60,933,844) 24,767,086 16,152,814 24,767,086 100.0% 0 24,767,086
Service Specific Earmarked Reserves (COVID-19):
Education Services Head Quarters 1,301,807 (134,000) 1,167,807 355,202 1,167,807 100.0% 0 1,167,807
Education Services Schools 12,075,284 (1,628,888) 10,446,396 5,976,069 10,446,396 100.0% 0 10,446,396
Social Work Services - Criminal Justice 57,341 0 57,341 30,875 57,341 100.0% 0 57,341
Active & Creative Communities 702,425 0 702,425 691,000 702,425 100.0% 0 702,425
Financial Insecurity / Welfare 4,645,208 0 4,645,208 2,492,923 4,645,208 100.0% 0 4,645,208
Community Renewal Fund 500,000 0 500,000 0 500,000 100.0% 0 500,000
SUB-TOTAL (Covid) 19,282,065 (1,762,888) 17,519,177 9,546,069 17,519,177 100.0% 0 17,519,177
TOTAL 104,982,995 (62,696,732) 42,286,263 25,698,883 42,286,263 100.0% 0 42,286,263
Commentary Regards UsageDESCRIPTION OF EARMARKED RESOURCE Reserve
Allocation
Adjustments
In Year
Approved
Reserve
Total
Spend to
Date
Projected Spend Reserves No
Longer
Required
Reserves
Required In
Year
FINANCIAL YEAR - 2022/23
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Status of Earmarked Reserves
Period 10 (01 April 2022 - 06 January 2023)
Education, Children & Families
Page 243 of 253

Page 244

APPENDIX 5
£000 £000 £000 £000 £000
Reconfiguration of Secondary School Week
to Facilitate Transformative Practice
626 626 0 0
Reconfiguration of Secondary Management
Structures
474 474 0 0
Management Models for Future Campuses 159 159 0 0
Realignment of Early Years Grant Cash Flow
to Match Expenditure
1,000 1,000 0 0
Residential / Family Placements /
Throughcare
600 300 300 Current level of service demand is in
excess of budgetary provision
Management Action within other
areas of the Service to offset savings
gap.
300 0
Merger / Rezoning School Catchments 675 175 500 Delay in the implementation of the
associated saving
Approval in place to rephase saving
and delay full-year implementation
until 2023/24.  In-year Management
Action within other areas of the
Service to offset savings gap.
500 0
Librarians 238 177 61 Delay in the implementation of the
associated saving
Management Action within other
areas of the Service to offset savings
gap.
61 0
Reduce management fees to Culture and
Leisure NL
3,058 1,058 2,000 Delay in the implementation of the
associated saving
In-year allocation of approved
Earmarked Reserve to manage delay
in the implementation of the
associated saving.
2,000 0
TOTAL 6,830 3,969 2,861 As stated above As stated above 2,861 0
58.11% 41.89% 41.89% 0.00%
Delivered Gap Replacement Revised-Gap
DESCRIPTION Value Revised
Savings Gap CommentarySavings Gap
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Savings
Period 10 (01 April 2022 - 06 January 2023)
Education, Children & Families
APPROVED SAVINGS REPLACEMENT SAVING / FUNDING
DESCRIPTION OF APPROVED SAVING Target Value Value
Deliverable Reasons for Savings Gap
Page 244 of 253

Page 245

APPENDIX 6
Value %
Recover NL One-Off Investments
Active & Creative
Communities
Culture, Leisure and
Sport Facility
Improvement Programme
Following the insourcing of culture, leisure and sport
services it is recognised that there is investment required to
ensure customers experience a positive and safe
environment from the Council's facilities which will, in turn,
support increased use of facilities and participation in active 
and creative activities.
1,000,000 1,000,000 1,000,000 100.0% 0 Usage in line budget motion approval
Active & Creative
Communities
Active60 Pass Building on the success of the Council's Active65
membership pass at £50 for the year, continuation for one
more year and extending the scheme to over 60s.
550,000 550,000 550,000 100.0% 0 "
Active & Creative
Communities
Keeping the Promise Free provision of sport and leisure facilities for care
experienced children and young people to promote physical
and mental wellbeing. This would include AccessNL
memberships, family passes to Time  Capsule Waterpark
and nutritional wellbeing support for one year.
300,000 300,000 300,000 100.0% 0 "
Active & Creative
Communities
Active Teens Extending the successful Active Teen programme of free
gym memberships for 11-15 year olds during the working
week for one more year.
300,000 300,000 300,000 100.0% 0 "
Education, Children &
Families
Scottish Attainment
Challenge
Reinstate Scottish Attainment Challenge funding for one
year only.
1,020,000 675,000 1,020,000 100.0% 0 "
Education, Children &
Families
School and Early Years
Clothing Grants
Continuation of enhanced grant value for school aged pupils
and NLC scheme for early years children for one more year.
300,000 195,000 300,000 100.0% 0 "
TOTAL 3,470,000 3,020,000 3,470,000 100.0% 0
Projected Spend Projected
Spend
Variance
Commentary Regards Usage
FINANCIAL YEAR - 2022/23
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Recover NL One-Off Investments
Period 10 (01 April 2022 - 06 January 2023)
Education, Children & Families
DIVISION PRIORITY AREA COUNCIL MOTION AREA
Approved
Investment
Total
Spend to
Date
Page 245 of 253

Page 246

Page 246 of 253

Page 247

North Lanarkshire Council
Report
Education, Children and Families Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref CG/JMcK Date 28/02/23 
Contracts awarded below Committee approval threshold 
From  Chief Officer of Assets and Procurement  
Email mckinstryj@northlan.gov.uk  Telephone James McKinstry
07939 281102 
1. Background 
1.1 The Councils General Contract Standing Orders (the ‘GCSOs’) outline financial
approval thresholds for contracts for goods, works and services. Contract awards
above £500,000 for Supplies and Services and above £2,000,000 for Works require
approval by the Committee. These contract awards are considered by the Committee
on a case-by-case basis. 
1.2 Where the value of a contract award is between £50,000 and £500,000 for Supplies
and Services and between £500,000 and £2,000,000 for Works, GCSOs require that
the Head of Asset and Procurement Solutions award these contracts on behalf of the
appropriate Chief Officer. 
Executive Summary 
This report notifies the Committee of the contracts awarded between 1 October 2022 to 31
December 2022. It sets out those contracts awarded with a value below the financial
threshold requiring Committee approval 
Recommendations 
The Education, Children and Families Committee are: 
• advised of the Contracts awarded below Committee approval threshold between 1
October 2022 to 31 December 2022 as per the process within the Council’s General
Contract Standing Orders.    
The Plan for North Lanarkshire
Priority  Support all children and young people to realise their full potential
Ambition statement
(10) Engage with children, young people, parents, carers, and
families to help all children and young people reach their full
potential
AGENDA ITEM 14
Page 247 of 253

Page 248

1.3 The Head of Asset and Procurement Solutions is required to notify Committee on a
regular basis of any such contracts awarded on behalf of Procuring Service Areas. 
2. Report 
2.1 The GCSOs require that contracts in excess of £500,000 for supplies and services and
£2,000,000 for works are approved, on a case-by- case basis, by the Committee before
award. 
2.2 The GCSOs require that contracts with a value above £50,000 but less than £500,000
for Supplies and Services and above £500,000 but less than £2,000,000 for Works are
awarded by the Head of Asset and Procurement Solutions on behalf of the appropriate
Chief Officer. 
2.3 The contracts awarded by the Head of Asset and Procurement Solutions that are under
the £500,000 Committee financial approval threshold for Supplies and Services and
£2,000,000 for Works in the period from 1 October 2022 to 31 December 2022 are
detailed in Appendix 1. 
3. Measures of success 
3.1 Contracts support the delivery of Council and service priorities. 
3.2 Appointment of contractors who have suitable experience and capability to deliver the
required supplies, services or works. 
3.3 Contracts awarded by the Council are compliant with GCSOs and procurement
legislation. 
3.4 The Council’s Contract Register is kept updated by services and management
information is comprehensive and accurate. 
3.5 Best Value is both demonstrable and achieved.     
4. Supporting documentation 
4.1 Appendix 1 - Summary of contracts awarded.   
James McKinstry
Chief Officer of Assets and Procurement 
Page 248 of 253

Page 249

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☐ No ☒
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Where Financial impacts have been identified, they have been established and 
addressed in each specific Contract Strategy and incorporated into the project.   
The Council’s Procurement Strategy proposes methods of maximising the delivery of 
procurement benefits that could bring improved financial return to the Council and 
the areas wider economy. Certain benefits have a monetary value attached and 
these will be monitored on a project-by-project basis.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☒ No ☐
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Where HR impacts have been identified, they have been established and 
addressed in each specific Contract Strategy and incorporated into the project.   
Contracts awarded by the Council are compliant with GCSOs and procurement
legislation.
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☒ No ☐
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Where Legal impacts have been identified, they have been established and 
addressed in each specific Contract Strategy and incorporated into the project.   
Page 249 of 253

Page 250

Contracts awarded by the Council are compliant with GCSOs and procurement
legislation.
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☒
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☒
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Sustainable procurement is one of the key objectives of the Council’s Procurement
Strategy and will have a positive impact, including, embedding sustainable
procurement as business as usual and incorporating community benefits into the
Councils contracts. Supporting local businesses and SMEs through closer working
with colleagues in the Council’s Enterprise department and by making our processes
more streamlined and accessible. 
Where Environmental/Carbon impacts have been identified, they have been 
established and addressed in each specific Contract Strategy and incorporated into 
the project.  
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
Where Risk impacts have been identified, they have been established and 
Page 250 of 253

Page 251

addressed in each specific Contract Strategy and incorporated into the project. 
Contract award procedures may be susceptible to legal challenge if they are not
discharged in accordance with GCSO and procurement legislation. 
5.1
0
Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)?
Yes ☐ No ☒   
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 251 of 253

Page 252

APPENDIX 1 – SUMMARY OF BELOW THRESHOLD CONTRACT AWARDS
Contract Description Contract
Award
Date
Contract
Start   
Date
Contract
End Date
Contract
Extensio
n
Contract Value
(incl
extension)
(£s)
Successful Tenderer  Supplies
Services
Works
No of
Tenders
Received 
Route*
BA Childhood Practice Course 27/10/2022 24/10/202 23/10/202 N/A £290,137.50 New College Lanarkshire Services 1 *CO
Public Library Management
Solution 2022-27 28/10/2022 01/11/202 31/10/202 N/A £230,000.00 Softcat PLC Services 1 **DAF3 
* CO – Contract Award from an Open Procedure where a single bid was received.
** DAF3 – Direct Award from a 3rd Party Framework (SG – SVAR) to best value provider. 
Key – Procurement Route
CO -   Contract Open Procedure
CR -   Contract Restricted Procedure
FO -   Framework Open Procedure
FR -   Framework Restricted Procedure
FMCC - Mini Comp Council Framework
FMC3 - Mini Comp 3rd Party Framework
DAFC - Direct Award Council Framework
Page 252 of 253

Page 253

DAF3 -  Direct Award 3rd Party Framework
DAH&SC - Direct Award Health & Social Care Related Services
N -   Negotiated Contract
EXT -  Extension to Contract/Framework 
Page 253 of 253