Revenue Budget Monitoring Report
North Lanarkshire Council · 13 September 2022
Back to Education, Children and Families Committee — 13 September 2022 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Page 1
North Lanarkshire Council Report Education, Children and Families Committee Does this report require to be approved? ☐ Yes ☒ No Ref: DB/TO’H Date 13/09/22 Revenue Budget Monitoring Report From Derek Brown / Thomas O’Hagan E-mail BrownD@northlan.gov.uk Telephone 01698 302 517 Executive Summary This report provides a summary of the financial performance of the Education, Children and Families Service for the period 1 April 2022 to 22 July 2022 (Period 4). The report illustrates the projected outturn position as at 31 March 2023, with major outturn variances highlighted and explained per North Lanarkshire Council’s approved Financial Regulations. North Lanarkshire Council approved its General Fund Revenue Budget on 17 February 2022, of which £465.120m (52.4%) represented the Net Revenue Budget for Education, Children and Families. Included in the Revenue Budget are approved savings totalling £6.830m. It is currently anticipated that £3.611m (53%) of these savings will be realised in the current financial year. The Service is currently forecasting an underspend of £0.158m to the end of the financial year. Recommendations It is recommended that the Education, Children and Families Committee:- (1) Review the financial position of the Education, Children and Families revenue budget. (2) Review the contents of the report. The Plan for North Lanarkshire Priority All priorities Ambition statement (25) Ensure intelligent use of data and information to support fully evidence based decision making and future planning
Page 2
1. Background 1.1 North Lanarkshire Council’s approved Financial Regulations require Executive Directors to remain within their approved budgetary provision, and to report all significant deviations - defined as the higher of £100,000 or 5% - within their budget monitoring reports. Where significant deviations are identified, Executive Directors must provide explanatory commentary, outline the action required to rectify such deviations and where relevant, must also highlight the impact this has on other budget headings. 2. Report 2.1 Summary of Financial Position 2.1.1 North Lanarkshire Council approved its General Fund Revenue Budget on 17 February 2022 of which £465.120m (52.4%) represented the approved Net Revenue Budget for Education, Children and Families. Following service budget realignments of £0.029m, the revised 2022/23 net Revenue Budget for the Service is £465.090m. 2.1.2 The Service is forecasting a net underspend of £0.158m to the end of the financial year. 2.1.3 The current 2022/23 budget incorporates £6.830m of savings previously approved by the Council on 17 February 2022. Further information regarding particularly challenging savings, along with associated management actions and replacement in- year savings, are included within this report at Appendix 5. 2.2 Analysis of Significant Variations 2.2.1 The Service has a total employee budget of £345.538m and currently anticipates a projected underspend of £3.659m. Establishment staffing budgets will be further realigned when the August pupil rolls are confirmed. Further contributors to the underspend include the roll out of a finalised Early Years operating model, actual and projected vacancies, coupled with the roll out of confirmed HQ and cluster staffing structures. 2.2.2 Service employee budgets are partly devolved to establishments per the Devolved School Management (DSM) scheme, with the remaining budgets held at HQ level. 2.2.3 The devolved teacher budget is £194.203m. Under the DSM scheme, the budget for teaching posts within schools is delegated to Headteacher management. 2.2.4 Schools also receive a non-teaching devolved staffing budget of £59.705m. School support staff are allocated to establishments on the basis of agreed formulas and individual pupil needs. Within the DSM scheme, these budgets are delegated to Headteacher management. 2.2.5 Non-School staffing budgets of £91.630m include HQ functions, as well as temporary grant funded posts in areas such as Scottish Attainment Challenge (SAC) programmes, along with Scottish Government and Covid grant received for the recruitment of additional teachers. 2.2.6 The Service is anticipating an overspend of £2.000m within Transport and Plant which reflects ongoing demand pressures within ASN transport (£1.385m), and increases to mainstream transport contract rates (£0.615m). 2.2.7 The Service is anticipating an overspend of £1.500m within Payments to Other Bodies primarily in relation to external placements within ASN service provision (£0.700m) and
Page 3
Family Placements (£0.800m) linked to cost pressures within External Fostering and Kinship Care. 2.3 Earmarked and One-off Resources 2.3.1 In finalising North Lanarkshire Council’s annual accounts to 31 March 2022, the Education, Children and Families Service was given approval to earmark £104.499m of resources represented by £85.217m (Non-Covid) and £19.282m (Covid) to fund key projects and initiatives. The majority of this reserve (£54.175m) is earmarked for existing school building contractual commitments. Other specific reserves include Pupil Equity Fund (PEF) carry forwards, DSM carry forwards, and ring-fenced 1140 Hours grant. Future monitoring reports will provide updates on use of these reserves during 2022/23 as outlined in Appendix 4. 2.4 2022/23 Budget Savings and Growth 2.4.1 The Council previously approved total savings of £16.484m during 2022/23. The initial Education, Children and Families Service savings target for 2022/23 was £6.830m. The Service uses a variety of information, records, and processes to monitor achievement of its approved budget savings. As at Period 4, it is anticipated that £3.611m (53%) of the approved savings target will be realised in the current financial year. 2.4.2 The unachieved savings of £3.219m have predominantly arisen due to temporary operational timing delays, the phased introduction of new staffing structures, consideration of the school academic calendar, and impact of Covid-19. In year management action has been taken to address this savings gap during 2022/23 with savings expected to be fully achieved during future financial years. 2.4.3 As part of the Council’s approved General Fund Revenue Budget for 2022/23, the Education, Children & Families Service were allocated £3.470m (Appendix 6) towards several one-off investments. Future monitoring reports will provide updates on use of these one-off investment allocations during 2022/23. 2.5 Management Action 2.5.1 Management will continue to review and implement actions through to financial year end with the aim of ensuring the Service operates within approved budget resources. These actions will include:- a) Vacancy management. b) Creating efficiencies through use of grant/external funding. c) Curtailment of non-essential expenditure. d) Application of reserves and earmarked resources to offset one-off cost pressures. 3. Measures of success 3.1 The Service operates within approved budget resources.
Page 4
4. Supporting documents 4.1 Appendix 1 Objective Analysis Appendix 2 Subjective Analysis Appendix 3 Payments to Other Bodies Appendix 4 Earmarked Reserves Appendix 5 Challenging Budget Savings Appendix 6 One-off Investments Derek Brown Deputy Chief Executive
Page 5
5. Impacts ( http://connect/report-template-guidance ) 5.1 Public Sector Equality Duty and Fairer Scotland Duty Does the report contain information that has an impact as a result of the Public Sector Equality Duty and/or Fairer Scotland Duty? Yes ☐ No ☒ If Yes, please provide a brief summary of the impact? If Yes, has an assessment been carried out and published on the council’s website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer- scotland-duty-impact-assessments Yes ☐ No ☐ 5.2 Financial impact Does the report contain any financial impacts? Yes ☐ No ☒ If Yes, have all relevant financial impacts have been discussed and agreed with Financial Solutions? Yes ☐ No ☐ If Yes, please provide a brief summary of the impact? 5.3 HR policy impact Does the report contain any HR policy or procedure impacts? Yes ☐ No ☒ If Yes, have all relevant HR impacts have been discussed and agreed with People and Organisational Development? Yes ☐ No ☐ If Yes, please provide a brief summary of the impact? Relevant pro-forma to be submitted to future WSG. 5.4 Legal impact Does the report contain any legal impacts (such as general legal matters, statutory considerations (including employment law considerations), or new legislation)? Yes ☐ No ☒ If Yes, have all relevant legal impacts have been discussed and agreed with Legal and Democratic Solutions? Yes ☐ No ☐ If Yes, please provide a brief summary of the impact? 5.5 Data protection impact Does the report / project / practice contain or involve the processing of personal data? Yes ☐ No ☒ If Yes, is the processing of this personal data likely to result in a high risk to the data subject? Yes ☐ No ☐ If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e- mailed to dataprotection@northlan.gov.uk Yes ☐ No ☐ 5.6 Technology / Digital impact Does the report contain information that has an impact on either technology, digital transformation, service redesign / business change processes, data management, or connectivity / broadband / Wi-Fi? Yes ☐ No ☒
Page 6
If Yes, please provide a brief summary of the impact? Where the impact identifies a requirement for technology, has an assessment been carried out (or scheduled) by the Enterprise Architecture Governance Group (EAGG)? Yes ☐ No ☐ 5.7 Environmental / Carbon impact Does the report / project / practice contain information that has an impact on any environmental or carbon matters? Yes ☐ No ☒ If Yes, please provide a brief summary of the impact? 5.8 Communications impact Does the report contain any information that has an impact on the council’s communications activities? Yes ☐ No ☒ If Yes, please provide a brief summary of the impact? 5.9 Risk impact Is there a risk impact? Yes ☒ No ☐ If Yes, please provide a brief summary of the key risks and potential impacts, highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk Registers), and how they are managed? The approach outlined in this report supports the Council’s actions in managing financial sustainability and financial management risks. Financial pressures and risks are reviewed on a regular basis by the Service Management Team, CMT and Committee.
Page 7
APPENDIX 1 [1] [2] [3] [5] [6] [8] [9] [10] Early Years 8,648,190 8,648,190 0 31,788,724 31,788,724 0 0.0% Primary Schools 28,436,794 28,436,794 0 128,030,242 128,030,242 0 0.0% Secondary Schools 29,425,763 29,425,763 0 127,090,309 127,090,309 0 0.0% Special Schools 5,103,569 5,103,569 0 20,176,565 20,176,565 0 0.0% Promoting Equity - Schools 0 (0) 0 0 0 0 0.0% Education Service Delivery 28,547,607 28,547,607 0 81,760,326 81,801,601 (41,275) ADV (0.1%) Underspends contained within Divisional employee costs budgets offset by overspends within transportation costs linked to ASN service delivery and contract inflation pressures. Children & Families 9,109,475 9,109,475 0 36,734,528 36,534,528 200,000 FAV 0.5% Underspends contained with Divisional employee cost budgets offset by overspends within Family Placements, External Fostering & Kinship Placements Justice Services 649,363 649,363 0 73,431 73,431 0 0.0% Active & Creative Communities 1,397,568 1,397,568 0 25,074,035 25,074,035 0 0.0% Employability 2,160,605 2,160,605 0 3,913,759 3,913,759 0 0.0% Community Learning 1,568,294 1,568,294 0 5,236,818 5,236,818 0 0.0% Welfare 827,057 827,057 0 2,072,882 2,072,882 0 0.0% Strategy for Young People 489,102 489,102 0 3,138,843 3,138,843 0 0.0% NET EXPENDITURE 116,363,387 116,363,387 0 465,090,462 464,931,737 158,725 FAV 0.0% 0 As stated above Education, Children & Families [4] [7] PROJECTED OUT-TURN VARIANCE NORTH LANARKSHIRE COUNCIL Revenue Budget Monitoring Report - Objective Analysis Period 04 (01 April 2022 - 22 July 2022) DIVISION OF SERVICE BUDGET TO DATE ACTUAL TO DATE YEAR TO DATE VARIANCE ANNUAL BUDGET PROJECTED OUT-TURN % PERIOD MOVEMENT ANALYSIS
Page 8
APPENDIX 2 [1] [2] [3] [5] [6] [8] [9] [10] EMPLOYEE COSTS 91,888,700 91,888,700 0 345,537,916 341,879,191 3,658,725 FAV 1.1% £3.659m underspend primarily due to delays in recruitment and establishment vacancies / turnover. PROPERTY COSTS 12,602,386 12,602,386 0 65,517,002 65,517,002 0 0.0% SUPPLIES & SERVICES 2,896,843 2,896,843 0 14,887,389 14,887,389 0 0.0% TRANSPORT & PLANT 3,562,352 3,562,352 0 13,754,853 15,754,853 (2,000,000) ADV (14.5%) £1.385m overspend in relation to ongoing cost pressures linked to ASN service delivery and £0.615m in relation to observed market increases for mainstream transport contracts. ADMINISTRATION COSTS 1,408,610 1,408,610 0 5,706,502 5,706,502 0 0.0% PAYMENTS TO OTHER BODIES 12,386,569 12,386,569 0 39,563,908 41,063,908 (1,500,000) ADV (3.8%) £0.700m overspend in relation to external ASN placements and £0.800m overspend in relation to external fostering / kinship placements. TRANSFER PAYMENTS 543,374 543,374 0 4,259,240 4,259,240 0 0.0% CAPITAL FINANCING COSTS 0 0 0 42,325,575 42,325,575 0 0.0% REVENUE FINANCING COSTS 0 0 0 0 0 0 0.0% OTHER EXPENDITURE 1,394,528 1,394,528 0 23,889,264 23,889,264 0 0.0% TOTAL EXPENDITURE 126,683,362 126,683,362 0 555,441,649 555,282,924 158,725 FAV 0.0% 0 As stated above INCOME (10,319,975) (10,319,975) 0 (90,351,187) (90,351,187) 0 0.0% NET EXPENDITURE 116,363,387 116,363,387 0 465,090,462 464,931,737 158,725 FAV 0.0% 0 As stated above [4] [7] PROJECTED OUT-TURN VARIANCE NORTH LANARKSHIRE COUNCIL Revenue Budget Monitoring Report - Subjective Analysis Period 04 (01 April 2022 - 22 July 2022) CATEGORY BUDGET TO DATE ACTUAL TO DATE YEAR TO DATE VARIANCE ANNUAL BUDGET PROJECTED OUT-TURN % PERIOD MOVEMENT ANALYSIS Education, Children & Families
Page 9
APPENDIX 3 [1] [2] [3] [5] [6] [8] [9] [10] GENERAL PTOBS 3,211,455 3,211,455 0 7,349,735 7,349,735 0 0.0% ADDITIONAL SUPPORT NEEDS 809,544 809,544 0 6,928,240 6,928,240 0 0.0% EARLY YEARS 5,035,199 5,035,199 0 13,894,454 13,894,454 0 0.0% VOLUNTARY ORGANISATIONS 294,148 294,148 0 1,114,610 1,114,610 0 0.0% FAMILY PLACEMENTS 3,017,279 3,017,279 0 10,054,583 11,554,583 (1,500,000) ADV (14.9%) £0.700m overspend in relation to external ASN placements and £0.800m overspend in relation to external fostering / kinship placements. CHILDRENS SERVICES - GENERAL 18,944 18,944 0 222,286 222,286 0 0.0% TOTAL EXPENDITURE 12,386,569 12,386,569 0 39,563,908 41,063,908 (1,500,000) ADV (3.8%) 0 [4] [7] PROJECTED OUT-TURN VARIANCE NORTH LANARKSHIRE COUNCIL Revenue Budget Monitoring Report - Payments to Other Bodies Period 04 (01 April 2022 - 22 July 2022) CATEGORY BUDGET TO DATE ACTUAL TO DATE YEAR TO DATE VARIANCE ANNUAL BUDGET PROJECTED OUT-TURN % PERIOD MOVEMENT ANALYSIS Education, Children & Families
Page 10
APPENDIX 4 Value % Service Specific Earmarked Reserves: School Carry Forward / Support 5,331,815 0 5,331,815 5,331,815 100.0% 0 5,331,815 PEF Carry Forward 5,122,022 0 5,122,022 5,122,022 100.0% 0 5,122,022 Seemis Replacement Project 36,399 0 36,399 36,399 100.0% 0 36,399 Early Learning and Childcare 14,248,598 (6,759,000) 7,489,598 7,489,598 100.0% 0 7,489,598 CYPMHW Framework 18,881 0 18,881 18,881 100.0% 0 18,881 Shotts Prison 46,844 0 46,844 46,844 100.0% 0 46,844 School Contractual Obligations 54,174,844 (54,174,844) 0 0 0.0% 0 0 Asylum Seeker 32,333 0 32,333 32,333 100.0% 0 32,333 Whole Family Wellbeing 233,272 0 233,272 233,272 100.0% 0 233,272 Student Social Worker Resumption Funding from Universities 21,380 0 21,380 21,380 100.0% 0 21,380 ESF Match Funding - Pipeline 406,136 0 406,136 406,136 100.0% 0 406,136 Active & Creative Communities 2,568,303 0 2,568,303 2,568,303 100.0% 0 2,568,303 Youth Guarantee Funding 2,908,913 0 2,908,913 2,908,913 100.0% 0 2,908,913 Legacy Flexible Fund 67,157 0 67,157 67,157 100.0% 0 67,157 SUB-TOTAL (Non-Covid) 85,216,897 (60,933,844) 24,283,053 24,283,053 100.0% 0 24,283,053 Service Specific Earmarked Reserves (COVID-19): Education Services Head Quarters 1,301,807 (134,000) 1,167,807 1,167,807 100.0% 0 1,167,807 Education Services Schools 12,075,284 (1,628,888) 10,446,396 10,446,396 100.0% 0 10,446,396 Social Work Services - Criminal Justice 57,341 0 57,341 57,341 100.0% 0 57,341 Active & Creative Communities 702,425 0 702,425 702,425 100.0% 0 702,425 Financial Insecurity / Welfare 4,645,208 0 4,645,208 4,645,208 100.0% 0 4,645,208 Community Renewal Fund 500,000 0 500,000 500,000 100.0% 0 500,000 SUB-TOTAL (Covid) 19,282,065 (1,762,888) 17,519,177 17,519,177 100.0% 0 17,519,177 TOTAL 104,498,962 (62,696,732) 41,802,230 41,802,230 100.0% 0 41,802,230 NORTH LANARKSHIRE COUNCIL Revenue Budget Monitoring Report - Status of Earmarked Reserves Period 04 (01 April 2022 - 22 July 2022) Education, Children & Families DESCRIPTION OF EARMARKED RESOURCE DIVISION Reserve Allocation Adjustments In Year Approved Reserve Total Projected Spend Reserves No Longer Required Reserves Required In Year FINANCIAL YEAR - 2022/23 Commentary Regards Usage
Page 11
APPENDIX 5 £000 £000 £000 £000 £000 Reconfiguration of Secondary School Week to Facilitate Transformative Practice 626 626 0 0 Reconfiguration of Secondary Management Structures 474 474 0 0 Management Models for Future Campuses 159 159 0 0 Realignment of Early Years Grant Cash Flow to Match Expenditure 1,000 1,000 0 0 Residential / Family Placements / Throughcare 600 0 600 Current level of service demand is in excess of budgetary provision Management Action within other areas of the Service to offset savings gap. 600 0 Merger / Rezoning School Catchments 675 175 500 Delay in the implementation of the associated saving Approval in place to rephase saving and delay full-year implementation until 2023/24. In-year Management Action within other areas of the Service to offset savings gap. 500 0 Librarians 238 119 119 Delay in the implementation of the associated saving Management Action within other areas of the Service to offset savings gap. 119 0 Reduce management fees to Culture and Leis 3,058 1,058 2,000 Delay in the implementation of the associated saving In-year allocation of approved Earmarked Reserve to manage delay in the implementation of the associated saving. 2,000 0 TOTAL 6,830 3,611 3,219 As stated above As stated above 3,219 0 52.87% 47.13% 47.13% 0.00% Delivered Gap Replacement Revised-Gap Education, Children & Families Period 04 (01 April 2022 - 22 July 2022) Revenue Budget Monitoring Report - Savings NORTH LANARKSHIRE COUNCIL Savings GapValue Deliverable Commentary Revised Savings GapDESCRIPTION OF APPROVED SAVING Target Value DESCRIPTION Value REPLACEMENT SAVING / FUNDINGAPPROVED SAVINGS Reasons for Savings Gap
Page 12
APPENDIX 6 Value % Recover NL One-Off Investments Active & Creative Communities Culture, Leisure and Sport Facility Improvement Programme Following the insourcing of culture, leisure and sport services it is recognised that there is investment required to ensure customers experience a positive and safe environment from the Council's facilities which will, in turn, support increased use of facilities and participation in active and creative activities. 1,000,000 1,000,000 100.0% 0 Usage in line with budget motion approval Active & Creative Communities Active60 Pass Building on the success of the Council's Active65 membership pass at £50 for the year, continuation for one more year and extending the scheme to over 60s. 550,000 550,000 100.0% 0 " Active & Creative Communities Keeping the Promise Free provision of sport and leisure facilities for care experienced children and young people to promote physical and mental wellbeing. This would include AccessNL memberships, family passes to Time Capsule Waterpark and nutritional wellbeing support for one year. 300,000 300,000 100.0% 0 " Active & Creative Communities Active Teens Extending the successful Active Teen programme of free gym memberships for 11-15 year olds during the working week for one more year. 300,000 300,000 100.0% 0 " Education, Children & Families Scottish Attainment Challenge Reinstate Scottish Attainment Challenge funding for one year only. 1,020,000 1,020,000 100.0% 0 " Education, Children & Families School and Early Years Clothing Grants Continuation of enhanced grant value for school aged pupils and NLC scheme for early years children for one more year. 300,000 300,000 100.0% 0 " TOTAL 3,470,000 0 3,470,000 100.0% 0 DIVISION PRIORITY AREA Commentary Regards UsageCOUNCIL MOTION AREA Approved Investment Total Spend to Date FINANCIAL YEAR - 2022/23 NORTH LANARKSHIRE COUNCIL Revenue Budget Monitoring Report - Recover NL One-Off Investments Period 04 (01 April 2022 - 22 July 2022) Education, Children & Families Projected Spend Projected Spend Variance