Democracy Spraffa

Agenda Document Pack - Council - 20/06/2024

North Lanarkshire Council · 20 June 2024
Back to Council — 20 June 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

11 June 2024 
Members of the 
Council
Chief Executive’s Office
Archie Aitken
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk 
Notice is given that a Special Meeting of the Council is to be held in the Council Chamber, Civic Centre, Windmillhill Street,
Motherwell, ML1 1AB on Thursday, 20 June 2024 at 14:15 PM or immediately following the conclusion of the Planning
Hearings Committee, which you are requested to attend. 
The agenda of business is attached. 
Des Murray
Chief Executive 
Members : 
Clerk Name: Mark Hamill
Clerk Telephone: 07811294702
Clerk Email: hamillm@northlan.gov.uk 
D Ashraf, A Ballinger, C Barclay, B Baudo, A Beveridge, M Boyd, H Brannan-McVey, G Brennan, B Burgess, A Bustard, J
Cairns, A Campbell, T Carragher, C Costello, M Coyle, S Coyle, D Crichton, G Currie, P Di Mascio, K Docherty, K Duffy, A
Duffy-Lawson, H Dunbar, T Fisher, F Fotheringham, W Goldie, K Harmon, M Hughes, J Hume, L Jarvie, D Johnston, T
Johnston, J Jones, P Kelly, J Keltie, A Khan, K Larson, J Leckie, G Lennon, J Logue, H Loughran, F MacGregor, A
Masterton, M McBride, B McCluskey, A McCrory, B McCulloch, M McCulloch, P McDade, F McKay, R McKendrick, J
McLaren, C McManus, F McNally, M McPake, J McPhilemy, A McVey, L Mitchell, L Nolan, P Patton, J Reddin, L Roarty, D
Robb, G Robinson, N Shevlin, W Shields, A Smith, K Stevenson, A Stubbs, L Stubbs, R Sullivan, A Thomas, J Toner, S
Watson, C Williams, N Wilson, G Woods.  
Page 1 of 74

Page 2

Page 2 of 74

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical Standards In
Public Life Etc. (Scotland) Act 2000   
2 Planning Application 23/00800/FUL - Proposed (Use Class 8)
Hospital (Replacement University Hospital Monklands) and
Supporting Hospital-Related Facilities, (Use Class 10) Nursery,
and all Associated Accesses, Parking, Landscaping,
Infrastructure and Associated Miscellaneous Development   at
Wester Moffat Farm (Land to the East of Wester Moffat
Hospital, Towers Road and South of Forrest Street) Airdrie
Submit report by the Chief Officer (Place) on an application for planning
permission by NHS Lanarkshire 
5 - 74 
Page 3 of 74

Page 4

Page 4 of 74

Page 5

Application No:  
23/00800/FUL
Proposed Development: 
Proposed (Use Class 8) Hospital (replacement University
Hospital Monklands) and supporting hospital-related
facilities, (Use Class 10) Nursery, and all associated
accesses, parking, landscaping, infrastructure and
associated miscellaneous development (with supporting
EIA report).    
Site Address: 
Wester Moffat Farm
(Land to the East of Wester Moffat Hospital, Towers Road
and South of Forrest Street)
Airdrie 
Date Registered: 
7th August 2023 
Applicant:
NHS Lanarkshire
Headquarters
Fallside Road
Glasgow
G71 8BB 
Agent:
Keppie Design
160 West Regent Street
Glasgow
G2 4RL 
Application Level:
Major Application 
Contrary to Development Plan:
Yes
Ward:   
08 Airdrie North 
Alan Beveridge, Sophia Coyle, Henry
Emerson Dunbar, Richard Alan Sullivan,
Representations:
7 letter(s) of representation received.    
Recommendation: Grant permission subject to conditions 
Reasoned Justification:
There is a pressing need to replace the existing Monklands Hospital in Airdrie.  Given
the many, varied and justified criteria in the applicant’s site selection process, there
are very few suitable sites available which could accommodate a new hospital and
the chosen site is the one most suited to their needs.  The site is a greenfield site
within the Green Belt; will involve the loss of some ancient woodland and on this
basis is considered to be a significant departure from the development plan. 
However, weighing in its favour is the need for the development, the constraints on
site availability, significant improvements in health care for many people and a degree
of economic benefit.  On balance it is concluded that this is an appropriate
development and that adverse environmental and access impacts can either be
mitigated or else justified when weighed against the wider benefits of the proposals.  
Item 2
Page 5 of 74

Page 6

Reproduced by
permission of the
Ordnance Survey on
behalf of HMSO. ©
Crown Copyright
and database right
2009.  All rights
reserved. Ordnance
Survey Licence
number 100023396.
Planning Application: 23/00800/FUL 
NHS Lanarkshire
Site: Wester Moffat Farm (Land to The East of
Wester Moffat Hospital, Towers Road and
South of Forrest Street)
Airdrie.
Development: Proposed (Use Class 8)
Hospital (replacement University Hospital
Monklands) and supporting hospital-related
facilities, (Use Class 10) Nursery, and all
associated accesses, parking, landscaping,
infrastructure and associated miscellaneous
development (with supporting EIA report)   
Page 6 of 74

Page 7

Page 7 of 74

Page 8

Executive Summary 
1.       Background, Site & Proposals 
1.1 It is accepted that the existing University Hospital Monklands is in a deteriorating physical
state and is in need of significant improvements both internally and externally.  In reviewing
all possible options for addressing these problems, it has been decided that a new hospital
should be built on a new site, and a site selection process was commenced in 2016.  To
achieve this, NHS Lanarkshire has set out site selection criteria for a new hospital as follows: 
• it must sit within the hospital care catchment area; 
• It must be a minimum of 40 developable acres (16.2ha); 
• The site must have no detrimental impact on adjoining catchment areas of hospitals
in Lanarkshire, Glasgow or Forth Valley; 
• The site must be designated to permit appropriate development; 
• The site must have sufficient road and transport infrastructure to support the
development of a major hospital site. 
1.2 An extensive site search of suitable and available sites resulted in a long list of 37 sites, with
a short list of 3 sites being brought forward, these being at Gartcosh, Glenmavis and Wester
Moffat (east of Airdrie).  It was concluded that the site at Wester Moffat was the strongest
contender and this has been developed into the planning application and Environmental
Impact Assessment report which are now under consideration.   
1.3 The site extends to 125ha, although the intended developable footprint would only extend to
33.7ha.  The site is broadly contained within an area to the south of Forest Street and east of
Towers Road.  The main development footprint would be sandwiched between the North
Calder Water to the west and the proposed East Airdrie Link Road (EALR) to the east.  The
EALR is being promoted by the Council (although does not yet have planning permission)
and is planned to be open to traffic in 2030 prior to the opening of the new Monklands
hospital. 
1.4 Neighbouring properties to the site include the residential areas of east Airdrie, Katherine
Park, Calderbraes and St. Philips schools, the Inverhouse distillery whisky bond, a golf
course and a former quarry which is currently being infilled and turned into a fishery (former
Springbank Quarry). 
1.5 The site undulates and there are significant ground differences in and around the North
Calder Water.  Most of the site comprises agricultural fields but there are trees alongside the
North Calder Water, on the boundary with Inverhouse distillers and in the centre of the site,
some of which is identified as “ancient woodland”.   
Page 8 of 74

Page 9

1.6 The proposed development seeks permission for a new hospital complex which would
replace the existing one.  In summary this would comprise a total of 183,074sq m of new
hospital buildings including the following: 
• a 2-storey main hospital block containing a “high street” thoroughfare linking the east
and west of the hospital.  This block would also contain A&E, outpatient services,
Pharmacy, Cancer Care Centre and Radiotherapy.  
• a 4-storey building comprising 5 interlinked blocks containing 485 single occupancy
rooms,
• a new “Maggie’s Centre” cancer care building,
• a nursery/creche building,
• a “facilities management” servicing yard
• an energy centre containing a range of renewable and low energy consumption
equipment, to service the hospital estate and help meet Net Zero Carbon ambitions.
• 2100 parking spaces including a 3 level multi-story car park 
• Various drainage works
• Various landscaping works including the creation of a 2.95ha community woodland,
4.09ha of natural grassland and 983m of hedgerow. 
1.7 Access to the site would take various forms including:
• Vehicular access to the hospital would be from a new roundabout on the proposed
EALR.  
• Pedestrian and cycle traffic would access the site from a new 4m wide “Active Travel
Route” which would connect the main hospital block with Towers Road.  
• A “resilience” access would be provided onto the EALR for use in emergency
situations should the main access roundabout/access road be blocked.  
• Road widening works are required on Forest Street (at the junction with Towers Road
and Connor Street) and this will extend the road into Katherine Park by around a
metre or so, likely resulting in the removal of approximately 16 mature trees.  
• In co-operation with SPT, NHS Lanarkshire will ensure that accessibility by bus will
match or exceed that at the existing hospital site.   
1.8 The majority of the construction works would be confined to an intended 33.7ha development
footprint (see plan at Appendix 1 – page 3 of this report).  Preparation for these works would
include: 
• The creation of several temporary construction access roads, most notably a new
road between the south-west corner of Plains and the construction compound.
• Treatment of old mine shafts etc
• Clearance of vegetation followed by significant land engineering works to create a
development platform.  Although the development footprint comprises mostly
agricultural land, it also includes an area of ancient woodland which would be
removed as part of the development.   
1.9 Impacts during construction works would be the basis of a Construction Environment
Management Plan (CEMP) designed to ensure that environmental considerations were
controlled and mitigated.  Ecological impacts would be the basis of controls overseen by an
Ecological Clerk of Works and an Arboriculture Clerk of Works.   
Page 9 of 74

Page 10

2.       Consultations 
2.1 Scottish Water, NLC Protective Services, Scottish Power Energy Networks, Historic
Environment Scotland, the Health and Safety Executive, the Coal Authority, Scottish Water,
NLC Archaeology, Forestry & Land Scotland, the Green Action Trust and Network Rail are all
generally satisfied with the proposals subject (in some instances) to the application of
relevant planning conditions, with no objections having been offered.   
2.2 NLC Traffic & Transportation has no objections with the overall access strategy but (as with
SPT) has concerns about the active travel route and also the lack of an effective secondary
access to the hospital.  It has suggested that if planning permission is granted, then NHS
Lanarkshire should continue to negotiate with the Council (as a City Deal partner) to see if
the detailed EALR design could help facilitate a better ATR and secondary access
arrangement.   
2.3 SPT states that it has had positive discussions with NHS Lanarkshire regarding suitable and
sustainable connectivity for the future users of the site.  SPT and NHSL have agreed that a
finalised Public Transport Accessibility Report be prepared before the hospital opens and its
recommendations implemented.  This will make provision for financial contributions from
NHS Lanarkshire which would then be used by SPT to create new bus services or alter
existing ones.  This would ensure that bus services would offer levels of accessibility equal to
or greater than that enjoyed at the existing hospital site.  SPT has also highlighted concerns
regarding the attractiveness of the ‘active travel route’ (given that it is 750m long and passes
through woodland) and the length of road which bus traffic would have to travel to get to the
bus stances at the hospital entrance.   
2.4 Sustrans is concerned that the proposals for Active Travel take a minimalist approach and do
not match the ambition for achieving sustainable transport development set in policy. 
2.5 SEPA has no objections subject to conditions relating to flood risk, protection of private water
supplies and the preparation and implementation of suitable CEMP and Habitat Management
Plan.   
2.6 NatureScot has no objections and is satisfied with proposed levels of mitigation but has
noted that the impact of the loss of ancient woodland and the loss of badger foraging areas
requires further detail and mitigation.     
3.       Representations 
3.1 Seven representations have been submitted; six being from local residents and one from St.
Philips School in Plains.  The residents have a variety of concerns relating to impact on local
amenity, road safety and nature conservation.  The school is concerned that construction
traffic will have an adverse impact on the operation of the school and on the future sale of
land in their control, which has planning permission for housing.   
Page 10 of 74

Page 11

4.       Development Plan 
4.1 The development plan comprises the National Planning Framework (NPF4) which was
adopted in 2023 and the North Lanarkshire Local Development Plan (NLLDP) which was
adopted in 2022.  The NLLDP identifies the site as Green Belt and presumes against
developments of this scale and nature.  There is also a presumption against the
development of greenfield land. The development is also contrary to policies which presume
against the loss of ancient woodland.  The development plan should be read in the round
and whilst it is acknowledged that there is support from development plan policies on many
fronts, on balance it is concluded that the development is a significant departure from the
development plan.  Section 25 of the Planning Act states that determination of planning
applications shall be made in accordance with the development plan unless material
considerations indicate otherwise.   
5.       Material Considerations 
5.1 Need for the Development/Site Selection Process/Impact on the Green Belt:  It is clear
that there is a pressing need for a replacement Monklands hospital, given the age and
condition of the existing hospital complex, and constraints imposed on its refurbishment.   
5.2 The needs of NHS Lanarkshire, in finding a suitable replacement site, are set out in the site
selection criteria noted above.  There are very few sites available which could meet their
needs.   Of the 3 sites in the short list, the site at Wester Moffat was deemed to be most
appropriate particularly given its ability to access the relevant catchment area.   
5.3 Despite the application site’s location in the Green Belt, the siting of the new hospital,
sandwiched between the edge of Airdrie and the line of the proposed EALR (along with
appropriate landscaping) should ensure that impacts on the character and appearance of the
Green Belt are well contained.   
5.4 Access Matters: As noted above, some consultees have raised concerns regarding the
attractiveness of the proposed active travel route (albeit NatureScot are supportive of it) and
Sustrans have made various other points critical of the over reliance on the private motor
car. However, on balance it is concluded that the access arrangements are acceptable (as
supported by NLC Traffic and Transportation) subject to various mitigations including the
public bus service scheme agreed with SPT and the use of appropriate lighting and security
measures on the ATR.  Furthermore, NHS Lanarkshire has undertaken to continue
discussions with the Council (as City Deal partner) to see what opportunities may arise as
part of the design and consultation process for the proposed EALR.  Finally, in terms of
access, it is unusual (but not unique) for the proposed development to be dependent on a
road which does not have planning permission.  Clearly the dependency of the hospital on
this road will present the applicant with various risks but these can be adequately managed
and mitigated.  The Council is committed to making progress with the road project through to
completion.   
5.5 Environmental Matters:  The applicant has proposed various protection, mitigation and
enhancement measures and these are welcomed.  The loss of the ancient woodland is
highly regrettable but given the location of the woodland (directly below the site of the main
hospital block) there is no reasonable scope to retain the woodland.  Weighing up this loss
against the wider benefits of the hospital development (plus additional mitigation works)
mean that the loss of ancient woodland can be justified.   
Page 11 of 74

Page 12

5.6 The necessary road widening works on Forest Street will likely necessitate the loss of 16
mature trees but these are generally in poor condition.  Their replacement with high quality
trees should allow the necessary road improvements to take place but should also allow for
medium to long term improvements to the appearance of the park and the surrounding area.   
6.       Conclusions 
6.1 The development is in the Green Belt and will involve the removal of some ancient
woodland.  Concerns have been raised over some aspects of the access and there are some
environmental impacts which cannot be wholly mitigated (eg loss of ancient woodland).  On
balance, the benefits of the development, including a significant improvement to health care
provision for a great many people, will far outweigh concerns regarding the development
plan, access and environmental issues.  Accordingly it is recommended that planning
permission be granted subject to conditions.   
Page 12 of 74

Page 13

Proposed Conditions:- 
1. Approved Drawings 
That unless otherwise agreed in writing by the Planning Authority, the development shall be
implemented in accordance with the schedule of plans as detailed in the document entitled
MRP - PLANNING SUBMISSION - PLANS PACK Version 27/3/24 and for the avoidance of
doubt the plans referred to in this condition are those marked as “Current Version Issued to
NLC”. 
Reason: To clarify the drawings upon which this permission is founded. 
2. Temporary construction access routes
That unless otherwise agreed in writing by the Planning Authority, before any
advanced/enabling works take place, further details of the temporary construction access
routes (as shown on plan number L309H-KEP-XX-XX-DR-A-601017 revision P01 and plan
number MRP-WSP-SE-XX-DR-C-1101) shall be submitted to the Planning Authority for its
prior approval.  These details shall include: 
• the location of access roads
• means of construction, 
• any resultant changes in levels 
• necessary drainage works
• a restoration scheme (including timetable for implementation) showing how the
temporary construction access routes (once construction works are complete) will be
restored back to their previous condition, or any other acceptable restoration scheme
agreed with the Planning Authority.  The agreed restoration scheme shall thereafter
be implemented in accordance with the agreed timetable.   
Reason: To ensure that all proper details are available and to ensure that the risk of flooding
is adequately addressed.   
3. Construction Access Groundwater Abstractions
Unless otherwise agreed with the Planning Authority in consultation with SEPA, in the event
that any groundwater abstraction is discovered during advanced/enabling works in relation to
any temporary construction access route from Stanrigg Street/Brownieside Road, then the
buffer zones (as illustrated on plan L309H-WSP-XX-XX-DR-O-000016) shall apply for the
relevant excavation depths. On any such discovery, any advanced/enabling works within the
identified buffer zones shall cease immediately, and investigation and monitoring, in
accordance with the provisions of ‘Land Use Planning System SEPA Guidance Note 31’,
shall be implemented, with the outcome of such investigation and monitoring submitted for
the approval of the Planning Authority in consultation with SEPA before works can continue
within the buffer zones. 
Reason: To ensure any advanced/enabling works do not have any detrimental impact on
any groundwater abstractions which are relied upon by immediately neighbouring properties
or land. 
Page 13 of 74

Page 14

4. CEMP
That unless otherwise agreed in writing by the Planning Authority, before any
advanced/enabling works take place, a Construction Environmental Management Plan
(CEMP) shall be submitted to the Planning Authority for its approval. The first submission of
this CEMP shall include information relevant to the advanced/enabling works and a timetable
for submitting the remaining information, which shall be submitted before any Hospital
building(s) works commence. The CEMP shall thereafter be submitted to the Planning
Authority for approval in accordance with the agreed timetable. The CEMP will describe
generic and detailed site-specific measures to avoid, reduce and mitigate construction phase
effects, including information of impacts associated with the construction of the hospital
buildings and implementation of the advanced/enabling works including the following works: 
• Installation of temporary access routes for construction traffic and subsequent removal/
restoration
• Establishment of a site compound
• Site clearance of vegetation / existing features
• Topsoil removal / mounding 
• Initial platforming earthworks / deep drainage installation 
• Installation of temporary construction stage drainage basins / ditches / pipework to
manage run-off in line with SEPA requirements.
• Establishing a temporary foul water connection for site facilities 
• Establishing a power supply and potable water supply 
• Treatment of mine workings and any ground remediation works 
In doing so, the CEMP shall (in general terms) provide details as follows: 
• Description of the construction works, including proposed timeline, logistics, and
responsibilities;
• Details of any consultation undertaken to date and proposed consultation and community
engagement during construction;
• Transport Management; 
• Environmental Management, Mitigation and Monitoring relating to environmental
construction phase effects, 
• Details of hours of construction works. 
In particular, the CEMP shall include (but not necessarily be restricted to) plans and
information which seek to address the following matters: 
(a) Construction Phase Traffic Management 
This should consider aspects such as: construction vehicle access routes; impact of
construction vehicles on pedestrians; impact of construction traffic on any narrow rural
roads that might be affected; requirement for mitigation at key junctions as a result of
increased construction traffic; requirements for temporary traffic management; good site
management practices, e.g. vehicle sheeting, wheel washing, road brushing, etc.     
(b) Soil Management 
This should set out best practice to be implemented by the contractor in terms of soil
stripping, handling, storage and reinstatement.   
(c) Stakeholder Communication: This shall include details of how the local community will
be kept up to date on progress with the implementation of the development, highlighting
any particular issues that may be of concern to the community. 
Page 14 of 74

Page 15

(d) Construction Noise and Vibration Management This shall take account of the
proposed mitigation measures contained within the EIA report, including chapter 12 and
most notably the works associated with the footbridge construction (including. trenching
pipes) and at the works associated with the mine adit (shafts). 
(e) Construction Dust Management 
This shall take account of the mitigation measures set out in appendix 6.2 of the EIA
report.   
(f) Groundwater and Surface Water Management and Monitoring 
This should ensure appropriate monitoring before, during and after the Construction
Phase (or any advanced/enabling works such as mine shaft grouting) and should make
reference to table 9-16 and 14-14 of the EIA Report. 
(g) Pollution Events
This shall include control measures for the following:
• Oil storage and refuelling;
• Working with concrete;
• Waste management; and
• Contaminated land 
(h) Significant Delays to the Programme
A strategy designed to address environmental impacts whereby the advanced / enabling
works are commenced and (for whatever reason) are left incomplete, with no substantive
works being carried out for 12 months or more.  This should include reference to creating
a green appearance to any exposed soils and any necessary interim drainage works.   
Thereafter the agreed CEMP shall be in operation and adhered to for the duration of all
construction works in accordance with the agreed timetable. 
Reason: To ensure that all construction impacts are understood and properly managed and
mitigated. 
5. Coal Mine Risk
That unless otherwise agreed in writing by the Planning Authority, before any
advanced/enabling works take place on the Main Development Site, Active Travel Route,
Foul Water Rising Main or Construction Access Route areas (as identified in Figure 1 – Site
Location Plan within Appendix 9.2 of the EIA), the following details shall be submitted to the
Planning Authority for its approval: 
A) The results of intrusive investigations to establish the risks posed to the development by
past coal mining activity on said area and
B) A Coal Mining Risk Assessment detailing the findings of all investigative works (non-
intrusive and intrusive) undertaken and presenting the proposed mitigation measures to
address land instability risks on said area arising from coal mining legacy, as may be
necessary. 
The shallow mining risk mitigation measures identified within the Coal Mining Risk
Assessment for said area of the site shall be implemented in full as part of the
advance/enabling works for that area to ensure that the site is safe and stable for the
development proposed.  The intrusive site investigations and mitigation measures shall be
carried out in accordance with authoritative UK guidance.   
Reason: To ensure the site is safe and stable for the proposed development.
Page 15 of 74

Page 16

6. Comprehensive Site Investigation 
That unless otherwise agreed in writing by the Planning Authority, before any
advanced/enabling works take place, a phase 3 comprehensive site investigation report shall
be submitted to and for the approval of the Planning Authority.  This report shall be based
upon the findings of the agreed phase 1 and 2 reports (WSP dated July and December
2023) and shall seek to address the outstanding issues as noted within the review document
by RSK Geosciences dated 24/01/2024.  Depending on the results of the investigation, a
detailed Remediation Strategy may be required.   
Reason: To establish whether or not site decontamination is required in the interests of the
amenity and wellbeing of future users of the development. 
7. Statutorily protected species 
Further updated surveys shall be undertaken on the site to determine the presence of
statutorily protected species.  Unless otherwise agreed in writing by the Planning Authority,
these updated surveys should be submitted to the Planning Authority and agreed before any
advanced/enabling works take place on site.   As a result of the studies, should any
mitigation measures be required for any protected species, these shall be incorporated and
implemented in accordance with the Species Protection Plan and Habitat Management Plan
(see conditions 8 and 15) 
Reason: In the interests of nature conservation and to ensure compliance with The
Conservation (Natural Habitats & c.) Regulations 1994 (as amended); the Wildlife and
Countryside Act (1981) as amended; the Protection of Badgers Act 1992 (as amended); and
the Nature Conservation (Scotland) Act 2004. 
8. Species Protection Plan (SPP)
That unless otherwise agreed in writing by the Planning Authority, before any
advanced/enabling works take place, a Species Protection Plan (SPP) shall be submitted to
the Planning Authority for its approval.  As a minimum, the SPP will cover the following
species/ species groups: 
o fish, herpetofauna (amphibians and reptiles), bats, badger, otter, pine marten and
breeding birds. 
The agreed plan then be incorporated and implemented in accordance with the Habitat
Management Plan (see condition 15 below) 
Reason:  In the interests of nature conservation and protection.   
9. Badger foraging Habitat Compensation Plan
That unless otherwise agreed in writing by the Planning Authority, before any
advanced/enabling works take place, an updated badger habitat and foraging resource
assessment shall be submitted to the Planning Authority for its prior approval.  This shall
provide additional information (as set out in the NatureScot letter 25 March 2024) and
thereafter shall detail additional opportunities to mitigate the impact of the development on
badger foraging habitat.   
Reason:  In the interests of nature conservation and protection and to ensure that impacts
on badger foraging are mitigated as much as reasonably possible.   
Page 16 of 74

Page 17

10. Updated Biodiversity Net Gain Assessment 
That unless otherwise agreed in writing by the Planning Authority, before any
advanced/enabling works take place, an updated Biodiversity Net Gain Assessment shall be
submitted to the Planning Authority for its prior approval.  This shall be based on the report
contained within appendix 7.3 of the EIA report, and shall be updated to take account of the
recommendations contained within section 4 of that report (page 26).   
Reason:  To ensure compliance with NPF4 and the recommendations of the EIA report.   
11. Tree Protection
That unless otherwise agreed in writing by the Planning Authority, before any advanced /
enabling works take place, details of tree protection measures shall be submitted to the
Planning Authority for prior approval. This shall take account of British Standard 5837-2012
‘Trees in Relation to Design, Demolition and Construction’ and any additional buffer /
exclusion zones (particularly in relation to bat protection) required as part of the Species
Protection Plan (see condition 8). The locations and suitability of tree protection should be
signed off by a suitably experienced and qualified Arboricultural Clerk of Works (ACoW) prior
to construction works. The ACoW should provide appropriate monitoring of the works and
any additional recommendations should be adhered to.  The agreed measures shall
thereafter be incorporated and implemented in accordance with the Habitat Management
Plan (see condition 15 below). 
Reason: In the interests of nature conservation and protection and to ensure compliance
with the planning application and EIA report.   
12. Invasive Non-Native Species 
That unless otherwise agreed in writing by the Planning Authority, before any advanced /
enabling works take place, an Invasive Non-Native Species (INNS) Management Plan shall
be submitted to the Planning Authority for its approval.  This shall be based on appendix 7.9
of the EIA Report and shall include a timetable for implementation.  Thereafter, the agreed
plan shall be implemented in accordance with the agreed timetable. 
Reason: In the interests of nature conservation and protection and to ensure compliance
with the planning application and EIA report.   
13. Deer Management Statement
That unless otherwise agreed in writing by the Planning Authority, before any advanced /
enabling works take place, a Deer Management Statement shall be submitted to the
Planning Authority for its prior approval.  This shall outline potential impact of the
development on deer welfare, along with any necessary mitigation measures. The agreed
measures shall thereafter be incorporated and implemented in accordance with the Habitat
Management Plan (see condition 15). 
Reason:  In the interests of nature conservation and protection and to protect the welfare of
deer on or near the application site. 
Page 17 of 74

Page 18

14. Compensation Management Plan (Ancient Woodland) 
That unless otherwise agreed in writing by the Planning Authority, before any advanced /
enabling works take place, a Compensation Management Plan shall be submitted to the
Planning Authority for its approval. This plan shall detail the impact of the loss of ancient
woodland and put forward commensurate mitigation proposals. In particular, this plan shall
examine mitigation opportunities in line with the hierarchy identified in the NatureScot letter
25 March 2024.Thereafter, the agreed compensation management plan will be integrated
into the Habitat Management Plan and implemented accordingly.   
Reason: In the interests of nature conservation and protection and to ensure that all
reasonable measures are undertaken to mitigate the loss of ancient woodland.   
15. Habitat Management Plan
That unless otherwise agreed in writing by the Planning Authority, before any advanced /
enabling works take place, a detailed Habitat Management Plan (HMP) shall be submitted to
and approved in writing by the Planning Authority. The HMP shall set how the agreed
biodiversity protection and enhancement measures will be implemented and will be
accompanied by: 
a) an ordnance survey scaled plan which clearly identifies the location and extent of the
areas proposed for habitat protection, management and enhancement. 
b) a detailed strategy of aims/objectives/intended works to be carried out; 
c) a timetable for carrying out the various works and confirmation of the lifespan of the
HMP; 
d) details of a monitoring/maintenance regime with associated reporting and appointment
of an Ecological Clerk of Works for the area all costs for which shall be met by the
developer;  
e) provision for the formation of a Habitat Management Group (HMG) to monitor
implementation of the plan and details provided on the intended frequency of meetings
of the HMG, a minimum of which shall be once per annum unless otherwise agreed in
writing by the Planning Authority; and 
f)  the HMP shall be submitted to the Planning Authority for review every 12 months over its
lifespan unless otherwise agreed in writing by the Planning Authority. 
The approved HMP, as amended as the case may be by the HMG, shall thereafter be
implemented in full to the satisfaction of the Planning Authority, unless otherwise agreed in
writing. 
For the avoidance of doubt, unless otherwise agreed, the agreed biodiversity enhancement
measures to be implemented (by way of the HMP) shall include any measures identified
within the updated Biodiversity Net Gain Assessment (as updated), Compensation
Management Plan (Ancient Woodland), badger foraging habitat compensation plan, GWDTE
habitat the Invasive Non-Native Species (INNS) Management Plan and Species Protection
Plan.   
Reason: To allow the Planning Authority to consider these aspects in detail and in the
interests of ensuring that the approved HMP is carried out and monitored in accordance with
the agreed scheme to secure appropriate biodiversity protection and enhancements. 
Page 18 of 74

Page 19

16. Archaeology
That unless otherwise agreed in writing by the Planning Authority, no advanced/enabling
works shall take place until the developer has secured the implementation of a programme of
archaeological work in accordance with a Written Scheme of Investigation which has been
submitted by the applicant, agreed by the local Archaeology Service and approved by the
Planning Authority. 
Reason; To ensure the appropriate recording of potential archaeology remains.  
17. Public Transport 
That unless otherwise agreed in writing by the Planning Authority, before any Hospital
building(s) works commence, the applicant shall submit an indicative programme identifying
the anticipated date of the hospital opening. This indicative programme shall include a date
18-months in advance of the anticipated hospital opening date by which time, unless
otherwise agreed with the local authority, a Public Transport Accessibility Report shall be
submitted for the approval of North Lanarkshire Council in consultation with Strathclyde
Partnership for Transport (SPT) which outlines the Public Transport Accessibility Strategy to
be implemented for the replacement hospital. Unless otherwise agreed in advance by the
Planning Authority, this report, and the associated methodology to be followed, shall be as
set out in ‘Section 7. Methodology’ of the ‘Public Transport Network Review – Technical Note
1 (FINAL)’ (dated 06 March 2024) approved as part of this permission.   
Reason: to ensure that a sufficient level of public transport accessibility is provided to the
new hospital in advance of its opening. 
18. Off Site Road Improvements (Towers Road/Forrest Street/Connor Street)
That unless otherwise agreed in writing by the Planning Authority, before any Hospital
building(s) works commence, full details of a scheme of road improvements for the Towers
Road/Forrest Street/Connor Street junction shall be submitted to the Planning Authority for
its approval.  These details shall seek to address the issues of road capacity (as set out in
the Transportation Assessment) and shall include details of the following: 
• Parking spaces/servicing area to the front of the commercial units on Forrest Street to
be retained and/or reconfigured. 
• Suitable pedestrian crossing facilities (existing or proposed) to be incorporated on all
arms of the junction, namely Towers Road, Forrest Street and Connor Street.
• A pre-start survey check(s) shall be made on all trees to be removed or altered to
determine the presence of bats, and should any bats be evident, mitigation measures
shall be implemented in accordance with a Species Protection Plan submitted to, and
agreed in writing with the Planning Authority, in consultation with NatureScot.
• Details of all necessary mitigation works to address all impacts on Katherine Park,
including (but not limited to) a landscaping scheme along the Forrest Street and
Towers Road boundary of the park including appropriate native replacement tree
planting.
• A phasing plan which provides a timetable for the completion of all works agreed as
part of this condition.   
Reason:  To ensure the necessary off-site road works are carried out in a timely fashion
in accordance with the terms of the submitted Transportation Assessment; to ensure
proper assessment and protection of any protected species and to ensure that the
function and character of Katherine Park is protected or enhanced. 
Page 19 of 74

Page 20

19. Resilience/Emergency Vehicular access
That unless otherwise agreed in writing by the Planning Authority, before any construction
works commence on the hospital structure, further details of the ‘Resilience access /
Emergency Vehicular Access’ (as illustrated within the Transport Assessment Appendix B)
shall be submitted to the Planning Authority for its prior approval.  Unless otherwise agreed
in writing by the Planning Authority, these details shall include the following: 
• Access to be gated, and gates to be set at least at least 10m back from the East Airdrie
Link Road carriageway;
• Fencing and other measures shall be in place to dissuade any unauthorised public
access.   
Thereafter, the development shall be implemented in accordance with these agreed details.   
Reason: In the interests of road safety. 
20. Flood Risk Assessment 
That unless otherwise agreed in writing by the Planning Authority, before any Hospital
building(s) works commence, an updated Flood Risk Assessment (FRA) shall be submitted
to the Planning Authority for its approval.  The updated document shall be based upon the
FRA prepared by WSP (dated December 2023) and shall address the following: 
• The requirement for further investigation of groundwater matters (and mitigation, if
required) as stated in paragraph 8.1.6 of the submitted FRA. 
• Consideration of the potential for the agreed Scottish Water offsite drainage network to
impact on flood risk (including any mitigation, if required) as stated in paragraph 8.1.7 of
the submitted FRA. 
Reason: To ensure that all matters relating to flood risk are known and understood, in
accordance with the planning application and EIA report.   
21. Unless otherwise agreed in writing by the Planning Authority, the terms of the Flood Risk
Assessment (as updated by condition 20) and the agreed surface water drainage scheme
(as outlined in approved plans and the agreed Drainage Strategy) shall be implemented
contemporaneously with the development in so far as is reasonably practical. Within 3
months of implementing the necessary mitigation works, and before any part of the new
development is first brought into use, a certificate (signed by a suitably qualified engineer
expert in flooding matters) shall be submitted to the Planning Authority confirming that these
works have been constructed in accordance with the relevant CIRIA Manual, approved
plans, and recommendations of the Assessments. 
Reason: To ensure that the agreed measures are implemented in a timely fashion in the
interests of flood prevention.   
Page 20 of 74

Page 21

22. Landscaping
That unless otherwise agreed in writing by the Planning Authority, before any Hospital
building(s) works commence, a scheme of landscaping shall be submitted to, and approved
in writing by the Planning Authority, and it shall include:- 
(a) details of any earth moulding and hard landscaping, boundary treatment, grass
seeding and turfing;
(b) a scheme of tree and shrub planting, incorporating details of the location, number,
variety and size of trees and shrubs to be planted;
(c) an indication of all existing trees and hedgerows, plus details of those to be retained,
and measures for their protection in the course of development.
(d) a detailed timetable for all landscaping works which shall provide for these works
being carried out contemporaneously with the development of the site. 
Reason: To ensure the timely submission of all necessary landscaping details.   
23. Landscape Maintenance. 
That unless otherwise agreed in writing by the Planning Authority, before any Hospital
building(s) works commence, a management and maintenance scheme shall be submitted
to, and approved in writing by the Planning Authority for the continuing care, maintenance
and protection of the landscaping works as approved under the terms of condition 22 above. 
This shall take account of the recommendations contained within para 16.4 of the EIA report. 
Thereafter, the approved maintenance scheme shall be implemented.   
Reason: To ensure the implementation and maintenance of the landscaping scheme in the
interest of amenity, nature conservation and to ensure compliance with the EIA report. 
24. Noise 
That unless otherwise agreed in writing by the Planning Authority, before any Hospital
building(s) works commence, an updated Noise Impact Assessment shall be submitted to
and approved in writing by the Planning Authority.  This shall be based upon the submitted
Noise and Vibration Report (WSP Appendix 12.1 dated February 2024).  The updated report
shall take account of the undernoted, and shall (where appropriate) provide details of any
necessary mitigation measures: 
• Impact of traffic noise (or anticipated traffic noise based on information available) from
the East Airdrie Link Road on the new hospital development, along with details of any
mitigation measures required. 
• Details of the impact of fixed plant and equipment on the proposed hospital development 
Reason: To ensure the provision of all necessary information on noise impacts. 
25. Scottish Water
That unless otherwise agreed in writing by the Planning Authority, before any Hospital
building(s) works commence, the applicant shall provide written confirmation to the Planning
Authority that all the requirements of Scottish Water can be fully met to demonstrate that the
development will not have an impact on their assets, and that suitable infrastructure can be
put in place to support the development. 
Reason: To ensure the provision of satisfactory sewerage and surface water drainage
arrangements. 
Page 21 of 74

Page 22

26. External Lighting
That unless otherwise agreed in writing by the Planning Authority, before any Hospital
building(s) works commence, full details of all external lighting shall be submitted to the
Planning Authority for its approval.  This shall be based on the submitted Lighting
Statement (Wallace Whittle – date 19/07/2023) and shall include details of the design,
location and appearance of all external lighting apparatus as well as details of brightness
and how lighting will be angled.  The submitted details shall take account of the safety,
amenity and environmental issues as outlined in the aforementioned Lighting Statement.   
Reason: In the interests of amenity, safety and nature conservation and protection.   
27. Suicide Prevention
That unless otherwise agreed in writing by the Planning Authority, before any works
commence on the Active Travel Route bridge (as per drawing L309H-WSP-XX-XX-DR-BR-
009003 P03 – ATR Bridge General Arrangement), full details of all suicide prevention
measures to be incorporated into the design of the active travel route bridge structure shall
be submitted to the Planning Authority for its prior approval. These details shall consider all
relevant guidance in place at the time of submitting the necessary details.   
Reason:  In the interests of suicide prevention and to accord with NPF4.   
28. Facing Materials 
That unless otherwise agreed in writing by the Planning Authority, before any Hospital
building(s) works commence, full details of the facing materials to be used on all external
walls and roofs shall be provided to, and approved in writing by the Planning Authority and
the development shall thereafter be implemented in accordance with the details approved
under the terms of this condition. Submission of these details can be by way of display
panels provided on site.   
Reason: To enable the Planning Authority to consider these aspects, in order to ensure that
materials are visually acceptable in a local context. 
29. Means of Enclosure
That unless otherwise agreed in writing by the Planning Authority, before any Hospital
building(s) works commence, the design, location and finishing materials for all fences, walls
and gates shall be submitted to, and approved in writing by the Planning Authority.
Thereafter the development shall be implemented in accordance with these approved
details.   
Reason: To enable the Planning Authority to consider these aspects in detail. 
30. Surfacing
That unless otherwise agreed in writing by the Planning Authority, before any Hospital
building(s) works commence, full details of the design and finish of materials to be used in
hard surfacing of external areas, shall be submitted to and approved in writing by the
Planning Authority. For the avoidance of doubt, this shall include the following: 
• the active travel route, 
• new paths within the community woodland area, 
• all footways and footpaths, 
• all roadways, parking and manoeuvring areas 
Reason: In the interests of amenity and design by ensuring that the materials are
appropriate for the site.
Page 22 of 74

Page 23

31. Publicly Accessible Toilet Facilities
That notwithstanding the terms of condition 1 above, unless otherwise agreed in writing by
the Planning Authority, before any Hospital building(s) works commence, revised drawings
shall be submitted to the Planning Authority which shows details of at least one publicly
accessible toilet facility of a design as set out in section 41B of the  Town and Country
Planning (Scotland) Act 1997 as amended and the Town And Country Planning (Changing
Places Toilet Facilities) (Scotland) Regulations 2020. 
Reason:  To ensure the provision of adequate toilet facilities in accordance with the terms of
the Planning Act.   
32. Site Security Strategy
That, unless agreed in writing with the Planning Authority in advance, before any part of the
new development is brought into use, a Site Security Strategy shall be submitted to the
Planning Authority for its prior approval. This Site Security Strategy shall provide details of
any CCTV or other surveillance (active or passive) or security measures to be provided
across the hospital site, including the Active Travel Route and Bridge. 
Reason: to ensure the safety and security of the users of the hospital site and the use of
active travel links to and from the site, in accordance with the requirements of NPF4. 
33. Noise Mitigation (Implementation)
Before the development is first brought into use, a certificate from a suitably qualified person
with Membership of the Institute of Acoustics shall be submitted to confirm that all required
noise mitigation works have been installed in accordance with the approved details and the
updated Noise Impact Assessment. 
Reason: To ensure the proper and timely implementation of all necessary noise mitigation
works. 
34. Ground Remediation Works (Implementation)
That any remediation works identified by the site investigation required in terms of Condition
6 shall be carried out to the satisfaction of the Planning Authority. A certificate (signed by a
chartered Environmental Engineer) shall be submitted to the Planning Authority confirming
that any remediation works (if required) have been carried out in accordance with the terms
of the Remediation Strategy prior to the hospital being brought into use. 
Reason: To ensure that the site is free of contamination in the interests of the amenity and
wellbeing of future users of the new development. 
35. Treatment of Old Mine Workings (Implementation) 
Before the hospital is brought into use a signed statement or declaration prepared by a
suitably competent person confirming that the site is, or has been made, safe and stable for
the approved development shall be submitted to the Planning Authority for approval in
writing.  This document shall confirm the methods and findings of any remedial/mitigation
works or further investigations undertaken to address the risks posed by past mining activity.   
Reason: To ensure the site is safe and stable for the proposed development. 
Page 23 of 74

Page 24

36. Travel Plan
That unless otherwise agreed in writing by the Planning Authority, before the hospital is
brought into use, a comprehensive Travel Plan that sets out proposals for reducing
dependency on the private car shall be submitted to and approved in writing by the Planning
Authority. In particular, this Travel Plan shall identify measures to be implemented, the
system of management, monitoring, review, reporting, and the duration of the plan. This plan
shall make reference to Section 8 (Travel Plan Framework) of the agreed Transportation
Assessment.   
Reason: To ensure sustainable travel is encouraged and promoted, in accordance with the
planning application and Transportation Assessment.   
37. That notwithstanding the terms of condition 1 above, unless otherwise agreed in writing,
the development shall be implemented in accordance with the following: 
• Ventilation and Extraction Statement (Prepared by Wallace Whittle, dated 19.07.23).
• Utilities Statement (Prepared by Wallace Whittle, dated 31.07.23).
• Energy and Sustainability Statement (Prepared by Wallace Whittle, dated 31.07.23). 
• Lighting Statement (Prepared by Wallace Whittle – date 19/07/2023) and as updated by
way of condition 26.   
Reason: To ensure compliance with information submitted as part of the planning
application.   
38. Waste Management Strategy 
That unless otherwise agreed in writing by the Planning Authority, before the hospital is
brought into use, an updated Operational Waste Management Strategy –shall be submitted
to the Planning Authority for its approval.  This shall be based on the draft report dated
January 2023 and prepared by NHS Lanarkshire entitled “MRP Facilities Management
Output Specification – Waste Services”.   This updated document shall take account of all
relevant waste management guidance in place at the time of the review.  The new
development (once operational) shall operate in accordance with the agreed Operational
Waste Management Strategy.   
Reason: In the interests of proper waste management and in accordance with NPF4. 
39. Further application for Maggie’s Centre
For the avoidance of doubt, the proposed “Maggie’s Centre” (as per drawings nos. L309H-
KEP-XX-XX-DR-A-601002 P16 - Proposed Site Plan (Hospital) and L309H-HLA-LA-EW-DR-
L-000002 P05 - Landscape Masterplan - Outline Design) is approved in principle only.
Before construction works commence on the “Maggie’s Centre” structure, a further planning
application or applications (an Application for Matters Specified by Condition) shall be
submitted to the Planning Authority in respect of the following matters:- 
a) the siting, design and external appearance of all buildings and other structures; 
b) the design and location of all boundary walls and fences; 
c) the arrangements for surface water drainage; 
d)      details of the proposed landscaping of the site. 
Reason:  This part of the development is granted in principle and to enable the Planning 
Authority to consider these aspects in detail.
Page 24 of 74

Page 25

40. Phasing
That unless agreed in writing with the Planning Authority in advance, before any part of the
new development is brought into use, the following works shall be in place: 
• The East Airdrie Link Road shall be open to traffic along its entire route. (Note: definition
of East Airdrie Link Road means a new road between Newhouse and Stand/Riggend, as
set out in the submitted Transport Assessment). 
• Towers Road/Forrest Street/Connor Street junction improvements shall be operational
(Note – this requirement relates to the works to the public road.  The timetable for other
environmental works within Katherine Park are to be agreed separately as per condition
18. 
• The Active Travel Route shall be operational and complete in so far as agreed surfacing,
lighting, suicide prevention measures and security strategy. 
• The agreed Public Transport Accessibility Strategy (as required by condition 17 below)
shall be fully implemented.
• The agreed Travel Plan, as required by condition 36, shall be fully implemented and the
agreed transport hub (bus stances with associated shelters and seating) shall be
complete and operational.
• All surfacing and delineation of roads, paths, parking and manoeuvring areas shall be
fully completed in accordance with approved plans and condition 30 including the
completion of the multi-story car park.  
• All proposed cycle parking and cycle storage facilities shall be complete and operational.  
• All agreed drainage works and other mitigation works as set out in condition 21 shall be
in place and operational. 
• The agreed site security strategy shall be implemented. 
Reason: To ensure that the timely implementation of all necessary measures which are
required before the new hospital development opens to the public.   
Page 25 of 74

Page 26

Background Papers: 
Consultation Responses: 
The Coal Authority 24th August 2023  
Historic Environment Scotland 31st August 2023 
Health and Safety Executive   
NatureScot 24th March 2024 
Network Rail 7th September 2023 
Scottish Forestry 6th September 2023 
Scottish Power Energy Networks 25th March 2024 
Scottish Water 23rd August 2023 
Scottish Environment Protection Agency 25th April 2024
Strathclyde Partnership for Transport 15th April 2024
Sustrans 25th October 2023   
NLC Archaeology Service 30th August 2023  
NLC Environmental Health (including Pollution Control) 23rd August 2023, 21st December 2023, 24th
January 2024,  
NLC Traffic & Transportation 19th March 2024 and 15th September 2023 and  
Green Action Trust 11th August 2023   
Contact Information: 
Any person wishing to inspect these documents should contact Lindsay Kellock at
planningenquiery@northlan.gov.uk 
Report Date: 
31st May 2024
Page 26 of 74

Page 27

APPLICATION NO. 23/00800/FUL 
REPORT 
1.        Background (Existing Hospital Site and Site Selection Process) 
1.1 Located on the western side of Airdrie, the existing University Hospital Monklands (UHM), at
the time of the planning application, is a 411-bed acute district hospital with a 24 hours a day
accident and emergency unit.  The main building was constructed in the 1970s but the site
has seen a great many additions and alterations since then.  Over recent years (starting as
far back as 2008) NHS Lanarkshire has carried out various consultation exercises with a
view to examining the future of the hospital.  Partly, this was initiated due to the deteriorating
physical state of the existing hospital facility, the need to modernise internally and the knock-
on impact on service delivery.  Most recently, an exercise was initiated in 2018 to look at 4
key options, these being: 
1. do nothing.
2. refurbish the existing hospital buildings.
3. build a new hospital on the existing hospital site.
4. build a new hospital on a different site. 
1.2 The conclusion of that exercise was that a new hospital should be built on a different site. 
Following an extensive site search, 2 possible sites were identified, one being in Gartcosh
and the other being in Glenmavis.  Thereafter the Gartcosh site was identified as the
preferred site.  However, this particular process was not concluded as the Scottish
Government initiated an independent review of the appraisal process.  Amongst the
conclusions of that review were that: 
• The existing site should be excluded from further consideration as it was not a
practical option.
• The scoring for the Gartcosh and Glenmavis sites should be re-assessed and
• Further sites should be examined. 
1.3 Thereafter, several potential sites were examined and NHS Lanarkshire’s site selection
criteria were applied, ie. 
1. Must sit within University Hospital Monklands care catchment area; 
2. Must be a minimum of 40 developable acres (16.2ha); 
3. Site must have no detrimental impact on adjoining unscheduled catchment areas
of hospitals in Lanarkshire, Glasgow or Forth Valley; 
4. Site must be designated to permit appropriate development; 
5. Site must have sufficient road and transport infrastructure to support the
development of a major hospital site 
1.4 Based on this criteria, one additional site was identified (ie over and above the Gartcosh and
Glenmavis sites) this being at Wester Moffat, east of Airdrie.  Following further assessment,
including a public vote, the Wester Moffat site was identified as the top scoring site and has
since been taken forward to form the basis of this planning application.   
Page 27 of 74

Page 28

1.5 In the period between confirming that the ‘Wester Moffat’ site was the preferred site and
submitting this planning application in August 2023, NHS Lanarkshire has been in discussion
with the Council (and in particular the Planning Service, the ‘City Deal’ Team and the Traffic
and Transportation Service) and many other stakeholders.  Of particular relevance to the
statutory planning process, NHS Lanarkshire has carried out pre-application consultation
(PAC) with local communities and also prepared preliminary environmental information which
was then the basis of an Environmental Impact Assessment scoping exercise.  In addition,
NHS Lanarkshire has also carried out consultation as a health care provider.   It is also worth
noting that the procurement of the hospital is the basis of the “NDAP” process (NHS
Scotland Design Assessment Process).  This means that funding from the Scottish
Government is the basis of guiding principles including input from “Architecture and Design
Scotland” (A&DS) who are the Scottish Government’s advisors on architecture and the built
environment, and Health Facilities Scotland (who provide operational guidance to the
Scottish Government and Health Boards to establish professional and technical standards
and best practices). 
1.6 In terms of other progress, it is noted that: 
• the project has funding commitment from the Scottish Government as far as the OBC
stage (outline business case) and NHS Lanarkshire hope to get approval for its full
business case (FBC) sometime in 2025. 
• the applicant has acquired all the land required on which the new hospital will be built. 
• Laing O’Rourke has been appointed by NHS Lanarkshire as a construction partner
and would be responsible for carrying out the development. 
2.       Application Site and Surrounding Area  
2.1 Planning Application Site:
The entire application site extends to 125ha although it should be noted the extent of the
developable area is only around 33.7ha.  (as outlined in section 3 below – Proposed
Development). The applicant has advised that the application site boundary is deliberately
wide, in order to future-proof any potential requirements for construction access or
underground infrastructure works.   
2.2 The application site is broadly contained within an area to the south of Forest Street and east
of Towers Road and is around 2.5km (1.5 miles) east of Airdrie town centre.   
2.3 For the most part, the site comprises open fields with various farm tracks, scattered trees,
hedges and woodland. At the time that the planning application was submitted in August
2023, there were operational farm buildings and a farmhouse at the western section of the
site (immediately south of the railway line and close to Katherine Park) but these will be
demolished and removed (see paragraph 5.5 below) in advance of any works on the new
hospital commencing. 
2.4 Traversing the site (generally from north-east to south) is the North Calder Water, much of
which is lined by mature trees.  There are other smaller water courses within the site
(associated with the North Calder Water) and these are un-named. Also traversing the site
(east of the North Calder Water) are the remains of a dismantled railway including the pillars
of an old railway viaduct. Along the western edge of the site is a line of 275kv electricity
pylons (the pylons being approximately 50m high).   
Page 28 of 74

Page 29

2.5 In terms of topography, there are significant differences in levels across the site.   Much of
the site undulates gently but part of the site slopes downwards steeply from a maximum
height of 191m AOD at the east part of the site down to a minimum height of 134m AOD to
the west (at the North Calder Water). 
2.6 Within the application site boundary (but largely unaffected by the development proposals)
are the following: 
• The existing Wester Moffat Hospital (which takes access from Towers Road) sits at the
westmost part of the site.  Comprising various buildings of various ages and styles, the
oldest part of the hospital is a category B listed building.
• The Glasgow-Edinburgh (via Bathgate) railway line traverses the north part of the site.
• The application site takes in a small part of the playing fields of Caldervale High School
at the southwest corner of the application site, accommodating connections to drainage
infrastructure;
• At the far north part of the site (adjoining Forrest Street) is the site of the former travelling
people site and a commercial recycling centre.       
2.7 Currently, vehicular access to the site is gained from a variety of locations including the
existing farm track to the (to be demolished) farmhouse and farm buildings at Wester Moffat
farm.  This access is taken via Katherine Park Lane which has a junction with Forrest Street
(immediately to the east of Katherine Park).  There are other field access points to the
farmland at the south side of the wider application site on Stepends Road.  Other means of
vehicular access (i.e. at the recycling centre at the north and the existing Wester Moffat
hospital) are self-contained and do not allow access into the wider application area.   
2.8 In addition, pedestrian access can be taken from the woodland area on Towers Road
(immediately north of Wester Moffat Hospital) which then links into the path network of the
“North Calder Heritage Trail” alongside the North Calder Water. (The majority of the paths of
the heritage trail are also identified by the council as ‘core paths’). 
2.9 Surrounding Area
Immediately adjoining the planning application site boundary are the following: 
• to the north of the site is St. Philips school (which includes residential accommodation). 
• To the east of the school is Brownieside Road (also known as Stanrigg Street) and a
vacant site which benefits from planning permission in principle for housing (planning ref
23/00287/PPP) 
• Beyond the northeast corner of the application site (and at the southern edge of Plains) is
Plains Country Park and also Plains Wastewater Sewage Treatment Works and various
detached houses. 
• To the east of the application site is the Easter Moffat golf course with club buildings.
(including the club house which is a category B listed building). Close to the club house
are a group of houses which are also category C listed buildings.   
• Beyond the southeast boundary (on the other side of Stepends Road) is the former
Springbank Quarry which is currently being filled in and developed with a view to creating
a fishery (planning permission ref. 21/00230/S42). 
• Beyond the southmost part of the application site is the large expanse of the Inverhouse
Distillery warehouse development. 
Page 29 of 74

Page 30

• Residential properties and Caldervale High School form an urban edge to the west. 
• Katherine Park (a council owned and maintained public park) is at the northwest corner
of the application site. 
3.       Proposed Development 
3.1 In summary, this planning application proposes a replacement hospital for the existing
University Monklands Hospital in Airdrie. The proposals include works to provide a level site
platform, provide new hospital buildings and associated structures (including an Energy
Centre and Multi-story Car Park), formation of pedestrian accesses, road connections to the
proposed ‘East Airdrie Link Road’, landscaping works, surface grade parking and
miscellaneous infrastructure and drainage works. Further details of the proposed
development is as follows: 
Extent of Development Footprint
3.2 The majority of the proposed works outlined below (with the notable exception of the
temporary construction access routes, the Active Travel Route and the off-site junction
improvements) are all contained within a 33.7 ha area within the middle of the wider red line
boundary.  This ‘development footprint’ is sited immediately east of the North Calder Water
and west of the indicative line of the proposed East Airdrie Link Road. This development
footprint is identified in the plan found in appendix 1 on page 3 of this report).   
Advanced Enabling Works
3.3 In advance of any new built development, there are significant preparatory works proposed
including the following: 
• Creation of temporary construction access routes. 
Most notably this will include the creation of a new construction access between
Brownieside Road (also known as Stanrigg Street) at the southwest corner of Plains and
the proposed site of the main contractor’s compound (to be located on the north side of
the proposed hospital development).  This would necessitate the construction of a new
temporary bridge over the North Calder Water. This access will accommodate the vast
majority of construction traffic and would be removed and restored once construction
works were complete.  In addition, the main site compound would also be accessed from
a secondary construction access from Stepends Road to the south.  Other construction
access points may be required from in and around the footpaths on Towers Road and
from Katherine Park Lane to the north.  These would not provide access to the main
compound and would be used for ancillary works such as the creation of the Active
Travel Route.  Details of the exact design and layout of these temporary routes (along
with necessary mitigation measures to protect safety and the environment) would be a
requirement of planning conditions. 
• Creation of construction platform
As noted above, there are significant differences in ground levels over parts of the site
and these are particularly prevalent within the ‘development footprint’.  In order to create
an area suitable for the proposed built development, the development footprint will be
cleared of vegetation and levelled off to create a 2-step building platform which would be
166m and 162m AOD. These works would comprise ‘cut and fill’ with the focus on
moving existing soil materials around the site to create the desired levels, although
around 25% of the soils are currently assumed to be taken off site for use elsewhere. The
applicant continues to develop a strategy to minimise off site materials.  
Page 30 of 74

Page 31

• Other ancillary works
Other work will include the treatment of old mine entries and the creation of construction
compounds (including all temporary works associated with this, such as drainage and
establishing power, water and sewage connections and so on).   
3.4 Once the advanced enabling works are complete then works could commence on
construction of the hospital buildings and associated infrastructure.  Extending to 183,074m2
the development would be comprised of many different elements which are summarised
below. 
Access/Parking/Manoeuvring
Proposed access works to the site are by way of the following: 
• All vehicular traffic would access the site by way of a roundabout on the proposed East
Airdrie Link Road (EALR). (This is a new road proposed by the Council which will
connect Newhouse to the south with Stand/Riggend to the north.  Further details of the
EALR project can be found in paragraph 3.8 below).  The EALR is intended for vehicular
traffic only and not for pedestrians or cyclists.  The new roundabout access on the EALR
will then connect into the hospital development by way of a 350m long dual carriageway
leading to an internal 4- arm roundabout which then feeds into all parts of the
development.   The main parking areas would be located on the south-east side of the
hospital and would include a multistorey car park at the east side of the development
footprint (and on the boundary with the EALR).  In total, there would be 2,100 parking
spaces, including 130 accessible spaces.  Some of these spaces will have EV charging
facilities; the exact number and location would be dictated by the Building Regulations. 
The multistorey car park will comprise a 3-storey structure, with curved ramp access to
each deck and solar canopies placed upon the top-deck. At the main entrance to the
hospital will be a public transport hub comprising bus stops, travel information and a
drop-off area.    Cycle parking facilities are provided and will be mostly focussed at the
west side of the building along with shower and changing facilities for staff.   
• An ‘Active Travel Route’ (ATR) path will provide a connection for pedestrians, cyclists
and wheelchair users between the west entrance to the main hospital block and Towers
Road (at the location of the existing path connection onto Towers Road).  This will then
allow for onward travel into the east side of Airdrie and to Drumgelloch railway station
(260 metres further to the west).  The new ATR would be 750m long and 4m wide and
would pass through existing and proposed woodland and will include suitable lighting
(including lighting/timing controls to balance safety and ecology considerations). Part of
the ATR will include a new bridge over the North Calder Water. Extending to around
125m long, the bridge will be 18m above the North Calder Water and will incorporate
design elements to minimise suicide risk.   
• A gated emergency ‘resilience’ access from the EALR is also proposed.  This is required
for two reasons. Firstly, it provides the necessary service area for the adjacent foul
drainage pumping station. Secondly, the access would accommodate emergency access
including fire tender and ambulance traffic should the need arise. It is anticipated that the
access would be controlled and operated by emergency services for the duration of a
significant closure on the EALR which could compromise the essential/emergency
functioning of the hospital.   
Page 31 of 74

Page 32

• Outwith the application site boundary (but required as part of the development) is a
scheme of road improvements in and around Towers Road/Forrest Street and Connor
Street.  Full details of these works would be agreed as part of a planning condition but
the following has been discussed to date: 
o The scheme will focus primarily on the widening of Forest Street (on either
side of the junction with Connor Street) and will include suitable pedestrian
crossing facilities. 
o The scheme will allow for the retention or reconfiguration of the
parking/servicing area to the front of the shop units on Forest Street.  
o As a consequence of the scheme, the widened roadway on Forest Street will
extend (by a metre or so) into Katherine Park.  As a result, approximately 16
mature beech trees may require to be removed. A scheme of mitigation,
including tree replacement with suitably mature specimens, will be required. 
Further details of these proposals can be found in paragraph 10.20 below. 
Built Structures
3.5 The proposed hospital complex will consist of a variety of structures and works as follows: 
• Main Hospital Block 
Located in the centre of the development footprint is the main hospital block.  This is
comprised of reception foyers and a “High Street” containing shops, cafes and so on,
which provides a link between the main access foyer at the east (next to the parking
areas and bus stops) and the west access foyer (which then leads to the
aforementioned ‘active travel route’).  This “High Street” connects with the
“emergency care village” which focuses on short stay visits (less than 48 hours)
including A&E, outpatient services, Pharmacy, Cancer Care Centre and
Radiotherapy.  Most of this building includes 2 levels of accommodation plus an
additional taller third level of plant space (maximum height approximately 18.4 metres
above ‘High Street’ level) which would be faced in a variety of materials including
brick and aluminium cladding, whilst the “high street” foyer areas would similarly
provide 2 levels of accommodation with a taller third level of plant space and be up to
approximately 18.5 metres in height.   
• Main Hospital Wards
The “Ward Crescent” is at the western edge of the development.  This comprises 485
single bedroom spaces contained within 5 interconnected blocks each over 4 stories
(including “basement” level below the High Street level), with pitched roofs and laid
out in an arc formation and orientated towards the west and south-west overlooking
the North Calder Water. These blocks would be up to approximately 30 metres in
hight (from basement floor level) and would be clad in brick with a dark grey roof
cladding.  In order to reduce the apparent impact and/or height of these blocks, this
part of the development would be built on the lower part of the development platform
(i.e. 4 meters lower than the rest of the development).   
• Energy Centre.
Located at the north side of the development (between the main hospital buildings
and the line of the proposed EALR) is the energy centre. This is a single-story
building but including ‘roof’ plant behind parapets (12.8 metres in height)
incorporating 3 chimneys (27.2 metres in height) and which will house a range of
renewable and low energy consumption equipment, to service the hospital estate and
help meet Net Zero Carbon ambitions.  An oil-fired boiler (to meet NHS Scotland
guidance on operational resilience) would also be used in case of emergencies only. 
Page 32 of 74

Page 33

• Maggie’s Centre
Designed to replace the existing Maggie’s Centre facility in the current site, this new
facility will sit separately but close to the main entrance of the main hospital block. 
This part of the development is being procured separately from the rest of the hospital
development and currently details are only in outline.  On this basis, planning
permission in principle is sought for this part of the development, and the details of
the design and appearance would be the basis of a further application in due course.   
• Nursery/Creche
This is a relatively small single-story building.  As with the Maggie’s centre, this will sit
detached from (but close to) the main entrance area. 
• Facilities Management (FM) Area
Located between the ward crescent and the line of the new EALR, the facilities
management yard would allow for an enclosed area for delivery vehicles.   
• Other structures
Ancillary to (and detached from) the main hospital buildings are a host of smaller
outbuildings including a pumphouse, garage, salt store and bottle store.   
• Landscaping
The proposals are the basis of a significant landscaping scheme in and around the
new hospital development.  In addition, and located at the north side of the ATR, is a
7ha area of new planting comprising community woodland, wild meadow and
hedgerows. 
• Drainage
The development is the basis of SUDS (Sustainable Urban Drainage Scheme) which
incorporates a system of connected basins located between the main hospital
development and the North Calder Water (into which the system drains). 
Relationship with Wider Area
3.6 The following provides an idea of local context: 
• The closest houses to the new development would be the residential areas on the
east side of Airdrie.  In particular, the houses on the east end of Lyle Road and
Alloway Road would be around 170 meters from the development footprint and 300
metres from the closest part of the hospital building.   
• Classrooms at Caldervale High School would be around 210 metres from the
development footprint and 310 metres from the closest part of the hospital building. 
• Buildings at St Philips School would be around 350 metres from the development
footprint and 420 metres from the hospital building.  The temporary access road
would be a minimum of 230 metres to the south. 
• Easter Moffat Golf Club House would be around 500 metres from the development
footprint (although it should be noted that the new EALR would be located between
the new hospital and the club house).  The temporary construction road would be a
minimum of 400 metres from the club house.   
Page 33 of 74

Page 34

EALR and Relationship with Proposed Hospital 
3.7 As noted above, the sole vehicular access to the site would be via the proposed East Airdrie
Link Road project (EALR). This road forms part of the council’s City Deal programme and is
a key component of the Pan Lanarkshire Transport Corridor Project providing a strategic
North/South route linking the M74 to the M80. The proposed EALR is a new 10km single
carriageway link road that would commence at Lancaster Avenue at Chapelhall (M8) and link
to the A73 dual carriageway south of Cumbernauld. The proposed hospital would take
access from the new road via a 60m diameter roundabout around 1300 meters south of the
new junction formed between Forest Street and the new EALR. 
3.8 The ongoing delivery and funding of the EALR is subject to the further funding approvals
through the Glasgow City Region City Deal Infrastructure Fund arrangements.  It is proposed
that an Outline Business Case (OBC) will be presented to the Glasgow City Region Cabinet
in August 2024. The OBC approval would secure the next tranche of funding and would
facilitate further development of the project to Full Business Case (FBC), which in turn,
subject to approvals, would allow for the construction of the EALR.  Design consultants have
now been appointed to prepare a detailed scheme to be submitted as a planning application
in 2025.  On the assumption that planning permission for the new road may be granted in
2026, then the current programme sees the road being built over a two-year period and open
to traffic in 2030.  In the meantime the EALR project is at an early design stage and only a
preferred route has been determined.   
3.9 The access strategy for the proposed hospital (as described earlier in the report) creates
sole dependency on the EALR for access by vehicular traffic.  NHS Lanarkshire confirmed
that the delivery of the EALR by the Council was one of the key factors in identification of this
site as the preferred site for the new hospital development. In order for the hospital project to
be successful, it is clear that there requires to be close and careful co-ordination with the
EALR project.  In terms of phasing, the current plan is that the hospital would be open to
patients in 2031 (ie around a year after the new road is likely to open).  Given the project
dependencies and complexities, the Council (in its responsibility as a City Deal partner) and
NHS Lanarkshire have regular technical meetings to discuss project programmes, to
coordinate and manage both proposals and to maximise project outcomes within the local
area. To be clear, these discussions sit outwith the planning process.   
3.10 Clearly, the fact that the planning application for the new hospital is dependent on a project
which does not have planning permission presents many issues relating to planning process
and risk, however this is not a unique situation, and this scenario and approach is
competent. These matters are addressed later in the report (paragraph 10.10). 
Page 34 of 74

Page 35

4. Applicant’s Supporting Information 
4.1 The planning application has been submitted with significant supporting information including
the following: 
• Full EIA report addressing many matters including air quality; biodiversity; cultural
heritage and archaeology; hydrogeology, geology and soils; landscape and visual;
socio-economics and land use; noise and vibration; traffic and transport; water and
flood risk and cumulative effects.   
4.2 In addition to the above, reports have been submitted on the following: 
• design and access statement; 
• drainage strategy; 
• energy and sustainability statement; 
• flood risk assessment; 
• light strategy; 
• operational waste strategy; 
• Pre-Application Consultation (PAC) report; 
• planning statement; 
• transport assessment; 
• utilities statement and 
• ventilation and extraction statement.   
4.3 In support of the application, NHS Lanarkshire estimates that operational employment will
amount to approximately 1,000 average annual FTE employees (approximately 870 of which
will be retained staff of the current hospital). It is estimated that the proposals will result in the
creation of an estimated 146 net additional jobs, of which 102 are estimated by the applicant
to be taken up by residents of North Lanarkshire. In addition, it is anticipated that the
proposals will generate 1,574.8 jobs on average per annum during the construction period. 
4.4 In planning for the operation of the new hospital, NHS Lanarkshire say that they have taken
the opportunity to use new technology in the proposed delivery of health care at the new
facility.  In particular, the proposed hospital is described as “Scotland’s first digital hospital”
whereby (in the applicant’s words) “the application of Information, Management &
Technology solutions will be a consideration across all aspects of design, and implemented
where this will facilitate new ways of working that support safe, patient centred care and
maximise operational efficiencies”.   
4.5 NHS Lanarkshire states that it has the ambition for the new facility to be Scotland’s first Net
Zero Carbon Hospital in operation.  This means that energy efficiency is a key consideration
at every stage in the design process and also that heat source technology and rooftop
photovoltaics will be key in energy provision.   
4.6 In relation to the submitted EIA report, it should be noted that during the assessment
process, additional information has been sought on Air Quality; Biodiversity; Noise and
Vibration; Water and Flood Risk and Contaminated Land.  Also, further changes and clarity
will be sought by way of planning conditions.  The applicant is of the view that these changes
do not amount to significant changes to the EIA report and therefore do not require to be the
basis of a full tranche of re-consultation or re-notification, and this is accepted.   
Page 35 of 74

Page 36

5. Planning History of Site 
5.1 Historical maps indicate that the site has remained largely in agricultural land use over many
years and recently the majority of the site has formed part of the Wester Moffat farm
holdings.  Since 2021, 4 ‘planning’ submissions have been made to the Council in relation to
the proposed hospital development (in addition to this planning application) and these are
summarised as follows: 
5.2 In November 2021, NHS Lanarkshire submitted an Environmental Impact Assessment (EIA)
Scoping Report to the Council (planning reference 21/01671/EIASCO) with the view to
agreeing the scope of the EIA.   Following consultation with all interested parties, the Council
issued a ‘scoping opinion’ in January 2022.   
5.3 As part of the statutory planning process for ‘major’ developments (such as this) the
developer is obliged to agree with the Council the extent and nature of pre-application
consultation events to be carried out between the developer and local communities.  This
was agreed in February 2022.  (planning reference 22/00198/PAN).   Given the nature of
restrictions at that time, the consultation events were restricted to two online live and
interactive web-based consultation events.  Those responding to the PAC consultation were
informed that the focus of this consultation was the development proposals from a planning
perspective. Additional and separate consultation activities for the project have taken place
over several years leading up to the preferred site and this planning consultation. This has
included consultation of the site selection process, the clinical requirements and operation of
the new hospital, and early and wide-ranging stakeholder engagement.  In response to the
Planning PAC process, a total of 69 responses were received, raising issues as summarised
below: 
• Connectivity (27%), 
• Roads (9%), 
• Parking (18%), 
• Green Space (7%), 
• Site and Site Selection (6%), 
• the Design (5%) and 
• Clinical Queries (14%). 
• Other queries (16%) were received in relation to the consultation process,
sustainability, layout and contractor questions. 
5.4 NHS Lanarkshire has been in discussion with Scottish Power Energy Networks (the owners
of the pylons which traverse the site) with a view to having the pylons and overhead lines
moved westwards and thus anticipating and facilitating the proposed hospital development. 
As part of that process, Scottish Power Energy Networks was obliged to apply to the Scottish
Government for consent under Section 37 of the Electricity Act 1989.  In turn, the Scottish
Government (by way of the Energy Consents Unit) consulted the Council on the proposed
relocation of the pylons and overhead lines.  In response, the Council confirmed that it had
no objections to the proposals. 
5.5 In November 2023, NHS Lanarkshire applied by way of the ‘prior approval’ process for the
demolition of the Wester Moffat Farmhouse (planning reference 23/01191/PRN).  On 13
November 2023 the Council confirmed that prior-approval was not required.  The farmhouse
will be demolished prior to any hospital works commencing, and the associated steel framed
farm buildings have been dismantled and removed.   
Page 36 of 74

Page 37

6. Development Plan 
6.1 The development plan comprises 2 parts.  Firstly, the National Planning Framework 4
(NPF4), was adopted by the Scottish Government on 13th February 2023 and forms part of
the Development Plan across Scotland.   This is required to be taken into account when
determining planning applications. Secondly, the Local Development Plan comprises the
North Lanarkshire Local Development Plan 2022.  In circumstances where there are
differences between NPF4 and the adopted North Lanarkshire Local Development Plan
(NLLDP), it should be noted that the NPF4 policy position will supersede the policies in the
NLLDP. 
6.2 The site is zoned within the North Lanarkshire Local Development Plan (2022) as Green Belt
(policy PP4). 
7.       Consultations 
7.1 The planning application and EIA report was the basis of various statutory and non-statutory
consultations and the responses are summarised as follows: 
7.2 NLC Traffic and Transportation has no objections to the proposals but has noted the
following: 
• Final design and construction of the site access/roundabout will be undertaken by the
Council’s EALR design team. 
• It is agreed that a 60m diameter roundabout is sufficient to allow access from the EALR
into the new hospital site.  It is accepted that the remaining junctions which interface with
the EALR cannot be analysed until a detailed design has been completed for the new
road. 
• The Transport Assessment (TA) submitted in support of the application concludes that
the local road network is unable to accommodate the hospital development traffic without
the EALR being in place and that the opening of the hospital is contingent on the EALR
being opened to traffic in its entirety. Any prospective planning approval should therefore
be conditional on the construction of the EALR in full prior to the opening of the hospital. 
• Both the hospital and the EALR will need to be constructed in tandem with similar
timescales for completion. There is no planning approval for the EALR, or any detailed
construction phase programme, at present. This would therefore introduce a risk of delay
to the opening of the hospital if construction of the EALR is not complete prior to the
construction of the hospital. 
• Whilst a single point of direct access from the hospital to the EALR would offer good
accessibility to the wider NHS Lanarkshire catchment, this would not offer a good level of
accessibility for vehicular travel to the site from the surrounding local road network.  NHS
Lanarkshire should therefore engage further with NLC with a view to developing a
suitable secondary vehicular access leading into the hospital from the existing local road
network to improve accessibility and journey times for local vehicular trips and bus
services. 
• The proposed active travel route may not be attractive to intended users due to the lack
of passive surveillance associated with the local topography, surrounding poorly lit
woodland environment and the walking distance required.  NHS Lanarkshire should
therefore engage further with NLC with a view to developing an alternative active travel
Page 37 of 74

Page 38

route via the existing road network in order to improve accessibility to the hospital for the
wider community which would be accessible to a whole range of users any time of the
day and night. There may be an opportunity to combine the active travel route with a
secondary vehicular access as noted above.  This could improve passive surveillance for
pedestrian/cyclist access and encourage increased access by these modes. 
• The proposed active travel route should be surfaced in bound material, have a system of
street lighting and should be designed to be compliant with the requirements of the
Disability Discrimination Act. 
• There is no direct pedestrian link to the south platform at Drumgelloch train station from
Sunnybank Drive or Dunrobin Road. The draft proposals outlined by the applicant would
be reliant on 3rd party agreement and do not appear to be deliverable. In addition, there
is no footway on the west side of Towers Road between the proposed active travel route
and Katherine Street, with no scope to provide this or to provide a controlled pedestrian
crossing on this section of Towers Road. Consequently, the connection to the train
station would require pedestrians to continue northwards on Towers Road to the existing
controlled junction at A89 Forrest Street before either continuing westwards on the
Forrest Street or returning southwards on Towers Road to Katherine Street. This would
impact on the accessibility of the hospital to public transport. 
• The Transportation Assessment suggests that the A89 Forrest Street / Towers Road /
Connor Street signalised junction will operate over capacity with the addition of hospital
development traffic and that mitigation works will be required to off-set the reduction in
capacity. Plans originally submitted with the planning application were considered
unacceptable for various reasons, but the applicant is in discussions with the Council and
it is clear that a satisfactory solution is achievable.   
• A Construction Phase Traffic Management Plan should be submitted to consider aspects
such as: construction vehicle access routes; impact of construction vehicles on
pedestrians; impact of construction traffic on any narrow rural roads that might be
affected; requirement for mitigation at key junctions as a result of increased construction
traffic; requirements for temporary traffic management; good site management practices,
e.g. vehicle sheeting, wheel washing, road brushing, etc. 
7.3 Strathclyde Partnership for Transport (SPT) has commented as follows: 
• SPT has had positive discussions with NHS Lanarkshire regarding suitable and
sustainable connectivity for the future users of the site. 
• From an environmental, social and health and well-being perspective it is essential that
users of the site are not reliant on private car use to access the site. 
• To ensure that public transport accessibility at the proposed site is as good as or better
than the existing site, a public transport review was undertaken by the applicant in
consultation with SPT. (This established current levels of accessibility at the existing
hospital and outlined possible measures to ensure that this level of accessibility was
matched or exceeded at the new site).  This exercise should be repeated closer to the
time that the hospital is due to open and its conclusions implemented.     
• the public transport offering for the new site is likely to be a combination of commercial
and supported services which will require funding support to establish. NHS Lanarkshire
would be expected to make financial contributions for the supported services for a period
Page 38 of 74

Page 39

until they become financially viable.  However, if they do not become viable then it cannot
be guaranteed that the service will continue.   
• Given the distance from the hospital to wider path and road network, the Active Travel
Route may be less than ideal to encourage access to the site by walking, wheeling or
cycling. As such it will be important to maximise opportunities to promote its use. 
• Only one vehicular access is proposed for the site which will result in substantial “dead
mileage” for bus services accessing the transport hub. Buses will interface with general
traffic, including areas of car parking and this could mean delays for buses at peak times.
Both these factors may mean that new bus services could be unattractive to commercial
bus operators. It is essential that every opportunity to enhance the attractiveness of the
proposed access points for active travel and public transport use is considered, including
mechanisms for enforcing parking to keep these routes free from parked vehicles. SPT
would be supportive should any opportunity arise in future to create an additional local
connection into the site which could enhance active travel and public transport
connectivity. 
• The requirement to produce and monitor a Travel Plan should be a condition of any
planning consent. 
7.4 NLC Greenspace has not commented on the detail of the planning application and EIA
report, but has provided input relating to: 
• procedural matters regarding the necessary temporary closure of parts of the North
Calder Water path network whilst the ATR is being constructed, and the
consequential temporary diversion which would be routed through Katherine Park, 
• the impact of any tree removal proposals (and consequential impacts on Katherine
Park) due to the off-site junction improvements at Forrest Street/Towers
Road/Connor Street.  It has also highlighted the need for suitable bat surveys to be
carried out on the trees to be removed and has highlighted that these surveys should
be carried out in advance of a decision being taken on this planning application.   
7.5 NLC Protective Services has reviewed the planning application and EIA report and has
commented as follows: 
• Noise impact – The submitted Noise Impact Assessment (NIA) has been reviewed
and found to be satisfactory. Planning conditions should be added to ensure that
further assessment is carried out once the detail of the new EALR and the extent and
nature of hospital plant and machinery is known. Otherwise, it is accepted that
subject to agreed mitigation, the significant construction works can take place and
that the hospital can operate without any undue impact on its surroundings and
neighbouring properties. 
• Ground contamination issues   - Phase 1 and 2 ground investigation reports have
been submitted and further clarity on some matters is sought by way of a phase 3
report.  NLC Protective Services is happy that these additional details can be sought
by way of planning condition. 
• Air Quality – NLC Protective Services has reviewed the Air Quality Impact
Assessment which formed part of the EIA report.  It agrees with the applicant’s
assessment that the effect of the proposed development on air quality is ‘Not
Page 39 of 74

Page 40

Significant’ and therefore no further assessment is necessary.  Mitigation measures
will be required and will form the basis of planning conditions.   
• Lighting - NLC Protective Services has reviewed the external lighting strategy which
forms part of the EIA report as part of its remit to investigate and control complaints of
light nuisance.  Subject to a planning condition requiring further details, NLC
Protective Services is satisfied with the proposals in relation to lighting.   
7.6 NatureScot has no objections to the planning application and EIA but has commented as
follows: 
• It is content that the Lady Bell’s Moss Site of Special Scientific Interest (located
approximately 800m southeast of the application site) will not be adversely affected
by the proposals. 
• the applicant should either provide more habitat compensation to offset the loss of
badger foraging habitat from the hospital development footprint, or explain why
additional compensation cannot be provided.  A badger licence will be required from
Naturescot.   
• The impact on bats is noted.  This will require suitable mitigation and protection
measures to be in place and will also be subject of a licence from NatureScot. 
• Species protection plans are also required for other species.   
• It has noted that there is woodland within the site (identified as to be removed) that
has not been properly identified as “Ancient Woodland”.  Further assessment is
required of this impact along with suitable mitigation. 
• The assessment reports an approximate 20% loss of foraging area for badgers.  It
might have to be accepted that there are likely to be negative impacts of unknown
magnitude that cannot be fully mitigated against, or compensated for, if the
development goes ahead as proposed, but it would be useful to understand if the loss
of foraging habitat could be better compensated for. 
• Other requirements of the EIA report (eg Ecological Clerk of Works, Construction
Environment Management Plan, Biodiversity Net Gain, Habitat Management Plan
and others) should be a requirement of planning conditions. Other than the points
regarding badger foraging, habitat compensation and ancient woodland
compensation, NatureScot are content with the general mitigation proposed.   
• Compared to earlier iterations of proposed plans (ie at the pre-application stage) the
design and layout of the ATR is welcomed as it is segregated from emergency
vehicles and is integrated into greenspace areas. 
7.7 SEPA has no objections to the proposed development subject to planning conditions being
applied regarding the CEMP (Construction Environment Management Plan), the Habitat
Restoration Plan (HRP), the protection of private water supply, and flood risk measures
associated with the design of the temporary construction access bridge.  In particular, SEPA
has made the following comments: 
Page 40 of 74

Page 41

• SEPA is satisfied that the proposed new hospital complex and the temporary
construction access (and bridge) from Plains is consistent with NPF4 Policy 22 part
a) in relation to flood risk. It is noted that the entire hospital complex will be elevated
more than 20m above the fluvial flood risk area associated with the North Calder
Water. The proposed site plan indicates that all the buildings will be a minimum of
80m from this watercourse. In the interests of flood prevention, a planning condition
should be added ensuring that any design changes to the construction bridge are
the basis of discussion and agreement with SEPA.
• SEPA accepts that it is unlikely that any remote residential properties or
farmhouses in the east part of the site will have private water supplies.  However,
in order to address any residual risk associated with construction works (most
likely to be associated with the temporary access road) severing any private water
supply, it has accepted that a suitably worded planning condition would be
acceptable.  
• A review of the drainage strategy confirms the approach is in line with relevant
guidance.
• This proposal will cause limited direct loss of GWDTE (Groundwater Dependent
Terrestrial Ecosystems) particularly along the line of the construction access
track.  This will require compensatory habitat creation and this should be
integrated into the Habitat Management Plan.   
7.8 The Health & Safety Executive has confirmed that it has no objections to the proposed
development.  The remit of the HSE in this instance relates to the inclusion of a small part of
the application site being within the consultation zone of a major installation ie the adjoining
Inverhouse Distillery site to the south-east.  The development footprint is outwith this
consultation area. 
7.9 Scottish Power Energy Networks (SPEN) has been working closely with NHS Lanarkshire
with a view to relocating the existing pylons and cables which traverse the site (see
paragraph 5.4 above) and do not object to the proposals.   
7.10 The Coal Authority has confirmed that part of the development site falls within a defined
high-risk area due to previous mine workings.   The applicant, by way of Coal Mine Risk
Assessments, has assessed the likely risk from these previous operations and has set out
various mitigation measures (including the treatment of old mine workings) which the Coal
Authority has reviewed and is happy with.  Some further detail is required and this will form
the basis of planning conditions.   
7.11 Scottish Water has no objections to the proposals.  In particular, it has confirmed that there
is sufficient water capacity currently available but that connection to the Daldowie
Wastewater Treatment Works will be subject to a separate approval process between the
developer and Scottish Water. As is normal practice, this will be the basis of a suitable
planning condition to ensure that the approval process is successfully concluded before any
construction works commence on site.     
7.12 Historic Environment Scotland (HES) has no objections or comments to make on the
proposals or the EIA report.   
7.13 NLC Archaeology recommends that an experienced and suitably qualified archaeological
contractor undertakes a programme of archaeological investigation works. 
Page 41 of 74

Page 42

7.14 Forestry and Land Scotland is broadly supportive of the proposals for improved modern
medical facilities. It notes that the chosen active travel route through Wester Moffat (the
woodland which is owned and maintained by Forestry and Land Scotland) will provide “a
green link through existing established woodland and the inclusion of this area will be to the
benefit of the hospital and the local community.”   
7.15 The Green Action Trust is happy to see that the proposals have a strong landscape
context, especially the therapeutic elements associated with areas such as the elderly care
section.   In terms of active travel, the trust sought clarification on the extent and nature of
cycle parking and changing facilities, and also asked about the possible use of a shuttle bus
between Drumgelloch Railway and the new hospital development. 
7.16 Sustrans (the organisation which promotes active travel and is responsible for the delivery
of the national cycle network) is concerned that the proposals for Active Travel take a
minimalist approach and do not match the ambition for achieving sustainable transport
development set in policy. The following is a summary of the points raised: 
• access is focused on priority for private vehicles and does not reflect sustainable
travel hierarchy. 
• using a “design/build/finance/maintain” contract will make retrofitting active travel
provision difficult and expensive
• The route from the train station is not well considered
• the site is impermeable from Plains and access via the national cycle network is
convoluted.
• There are no references to multi-modal travel despite Drumgelloch Railway station
being in close proximity and Caldercruix station being within 2-3km.
• The catchment area consists of deprived areas with low car ownership which will
impact on accessibility and journey choices 
• Essential discussions with bus operators are needed 
• 0% modal share to travel actively is at odds with the aims of national policy. 
• The justification for expansion of the car park does not take account of any work to
reduce demand on car parking and rates of single occupancy car journeys, 
• The report into transport demand is flawed and does not reflect the 24 hour/day
nature of the hospital 
• The Active Travel Route goes through wooded areas, does not include lighting or
segregation. 
7.17 Network Rail has no objections in principle to the proposed development subject to various
stipulations including draining infrastructure being at least 10m away from the railway, certain
restrictions on the type and location of landscaping near the railway and the detail of any
construction works and plant/machinery close to the railway should be agreed with Network
Rail in advance.  These matters can be addressed by way of an advisory note attached to
any permission. 
Page 42 of 74

Page 43

8. Representations 
8.1 In response to the neighbour notification procedure and press advert, 7 letters of
representation have been received. Of these, 6 were from local residents, (5 being
objections and 1 being neutral) and one from St Philip’s School which borders the site to the
north. Representations from residents can be summarised as follows: 
 Concerns regarding impact on local road network in terms of convenience,
disturbance and road safety 
 Concerns regarding impact on local peace and quiet of the area 
 The new hospital is welcomed but not at the expense of the local
environment. The area is rich in wildlife and habitat. 
 Adverse impact of development on the existing woodland and footpaths off
Towers Road. 
 One ‘neutral’ representation (neither objecting or supporting the proposals)
was submitted which suggested that opportunities to build in good walking
and cycling routes had been missed.  For example, links could have been
provided to cross the North Calder Water to the existing core paths and
Heritage Trail. Also, the car park layout will allow for conflict between cars and
pedestrians.   
8.2 A letter of objection has been received from the Board of Managers of the St Philips School
(St. Philip’s School is a residential school providing care, psychological support, and
education, to young people who have had difficulties in adapting to their previous school
environment, and it is located to the north of the application site and on the western edge of
Plains). The Board are extremely supportive of the new hospital development, seeing it as a
long overdue new health facility for the local area that will benefit everyone, but they have
concerns as follows: 
• The use of Brownieside Road as a construction haul route will potentially cause
amenity, noise, and air quality concerns for the school if not properly mitigated. 
• Noise mitigation (during construction works) by way of a 3m high hoarding alongside
the temporary construction route has not been adequately assessed and the Board
may appoint their own noise expert to advise them.  In any case, the hoarding will be
unsightly and will impact on the operation of the school. 
• The school owns the proposed housing site on Brownieside Road/Stanrigg Road (see
second bullet point in paragraph 2.9 above). This is close to the site of the temporary
construction road. The majority of construction traffic to the hospital would pass by
this site and the sale and development of this site would be almost impossible until
the hospital construction works were complete.     
Page 43 of 74

Page 44

• The school board has suggested ways in which their objection could be withdrawn: 
o The Board would consent to the widening of Brownieside Road/Stanrigg Road
to make it suitable for construction traffic. 
o The Board would make available their consented housing site for use by the
hospital contractor as a compound area, provided that the contractor and the
Council consented access to the site on a permanent basis. 
8.3 Finally, six objections were received outwith the agreed timescale and therefore there is no
requirement for the Council to take these comments into account when assessing the
planning application and EIA report.  All 6 representations object to the possible creation of a
new pedestrian footpath link between the south platform at Drumgelloch railway station and
Sunnybank Drive and Dunrobin Road.  It is stressed that the planning application does not
include provision for the creation of such a link.  Further context and commentary on this
matter can be found at paragraph 10.22 below. 
9. Development Plan Assessment 
9.1 As noted earlier, the development plan comprises National Planning Framework 4 2023
(NPF4) and the North Lanarkshire Development Plan 2022.  Whilst both are up to date, the
adoption of NPF4 post-dated the adoption of the NLLDP, and therefore in instances where
there are discrepancies between policies in the 2 documents then it will be the policies in
NPF4 that will prevail. Development plan policies are designed to be read as a whole. Where
a policy states that developments will be supported (or not) it is for the decision maker to
determine what weight to attach to it on a case-by-case basis.   Should it be concluded (on
balance) that the development accords with the development plan then the planning
application should be granted permission unless material considerations suggest otherwise,
and likewise if found to be a departure then permission should be refused unless material
considerations suggest otherwise.  
9.2 Below is an assessment of how the development complies with relevant policies within NPF4
followed by (in paragraphs 9.73 onwards) a similar assessment of the NLLDP.   
National Planning Framework 4
9.3 Policies 1 and 2 (Tackling the Climate and Nature Crises & Climate Mitigation and
Adaptation)
9.4 The first 2 policies of NPF4 overlap and can be reasonably looked at together.  These
policies are summarised as follows:
• When considering all development proposals significant weight will be given to the
global climate and nature crises.
• Development proposals will be sited and designed to minimise lifecycle greenhouse gas
emissions as far as possible.
• Development proposals will be sited and designed to adapt to current and future risks
from climate change. 
Page 44 of 74

Page 45

9.5 The applicant has pointed out that the new hospital development will be Scotland’s first ‘Net
Zero Carbon Hospital’ in operation and there is an ambition to comply with the Net Zero
Carbon Public Sector Buildings (NZCPSB) standard.  In particular, the development has
been selected as a ‘Pathfinder’ project for this new standard which has resulted in the
requirement for an all-electric hospital requiring a substantial energy centre to accommodate
the required technology. To achieve this the development would incorporate a variety of
technologies such as:
• Air Source Heat Pumps (ASHP) and Water Source Heat Pumps (WSHP) 
• Photovoltaic solar panels mounted for areas of south facing roof space. 
9.6 In relation to climate change, it is also noted that there are no significant flood risk issues
associated with the site or the development either now or in the future.  
9.7 On the basis of the above, it is accepted that the proposals respond positively to NPF4
Policies 1 and 2.
9.8 Policy 3 Biodiversity intends to protect biodiversity, reverse biodiversity loss, deliver
positive effects from development and strengthen nature networks.  Relevant extracts of this
policy are as follows:
• Development proposals will contribute to the enhancement of biodiversity, 
• Development proposals for major development, or for development that requires an
Environmental Impact Assessment will only be supported where it can be
demonstrated that the proposal will conserve, restore and enhance biodiversity so they
are in a demonstrably better state than without intervention. This will include future
management. 
• Any potential adverse impacts, including cumulative impacts, of development
proposals on biodiversity, nature networks and the natural environment will be
minimised through careful planning and design. 
9.9  In response to this policy, it is noted that the planning application is accompanied by a full
EIA which includes a Biodiversity Net Gain (BNG) Assessment.  In seeking a net-gain in
bio-diversity, the application includes various measures most notably 2.95ha of
broadleaved woodland; 4.09ha of neutral grassland and 983m of hedgerow.   NatureScot
confirms that it is happy with the level of mitigation and enhancement subject to further
information and additional mitigation relating primarily to ancient woodland and badger
foraging (these matters are addressed in more detail in Policies 4 and 6 below).  All these
works will be the basis of a Habitat Management Plan which will set out how the protection
and enhancement measures will be implemented and then managed. Overall (and subject
to conditions requiring additional information and mitigation) it is accepted that the
proposals accord with policy 3.   
Page 45 of 74

Page 46

9.10 Policy 4 Natural Places intends to protect, restore and enhance natural assets making best
use of nature-based solutions.  Relevant sections of this policy are as follows: 
• Development proposals which will have an unacceptable impact on the natural
environment, will not be supported.
• Development proposals that will affect a Site of Special Scientific Interest will
only be supported in certain circumstances.  
• The precautionary principle will be applied in accordance with relevant legislation
and Scottish Government guidance.
• Development proposals that are likely to have an adverse effect on species protected
by legislation will only be supported where the proposal meets the relevant statutory
tests. 
9.11 A large part of the focus of this policy is on land and/or species with protected status.  In
this case there are two Sites of Interest for Nature Conservation (SINC) within the site.  The
Lady Bell’s Moss Site of Special Scientific Interest (SSSI) is within 800m of the site and has
the potential to be adversely impacted by the development.  In terms of species, the EIA
report has carried out appropriate tests to ascertain the presence of a variety of protected
species and has found evidence of bats and badgers.  
9.12 NatureScot has confirmed that it is satisfied that Lady Bell’s Moss SSSI will not be
adversely affected by the proposals subject to various mitigation measures which are
proposed and will be a requirement of the planning permission.  
9.13 Of the two SINCs on the site, one comprises the woodland area alongside the North Calder
Water whilst the other is the woodland along the north side of the Inverhouse distillery. 
Both are outwith the development footprint of the new hospital and any adverse impacts are
expected to be small and addressed by protection and mitigation measures.  
9.14 In terms of impact on bats (protected under European legislation) within the site, it is noted
that one bat roost will need to be destroyed to facilitate the development and others (not
directly impacted) will require protection during construction operations.  It is noted that
NatureScot are satisfied with the mitigation and protection measures proposed.  Outwith the
site, it is noted that the off-site road improvements on Forrest Street will likely result in the
loss of trees with bat potential at Katherine Park.  This is not currently supported by a
detailed bat roost survey which is normally required before a planning application is
determined.  In defence of this approach, the applicant has confirmed that a ground visual
survey has been undertaken and suggested that a precautionary approach be taken ie it is
being assumed that there are bats roosting in the trees and this will help guide the
additional assessment, protection and mitigation.  Although not in accordance with guidance
and established practice, in this instance it is accepted that this matter can be adequately
addressed by way of planning condition.  Further details can be found in paragraphs 10.20
– 10.21 below. 
Page 46 of 74

Page 47

9.15 In terms of impact on badgers, the development will impact on badger shelters within the
site.  NatureScot is satisfied with the level of impact and the control measures proposed by
the applicant.  These works will require a licence from NatureScot.  The main impact on
badgers is likely to be the result of a reduction of foraging area of around 20%.  It is
intended that this be addressed by a planning condition which seeks further information on
mitigation works.  NatureScot acknowledge that this particular impact may not be capable
of being fully mitigated.  Policy 4 states that adverse impacts on protected species will only
be supported where the proposal meets relevant statutory tests.  These tests are mostly
relevant to species with European protection (and this does not apply to badgers which are
protected under UK legislation due to the level of persecution they suffer).  However, it
should be noted that the works will require to be the basis of a licence from NatureScot
(and given the input from NatureScot on the proposals, there is no indication that the works
are not capable of receiving a licence).  
9.16 More generally, the EIA report contains details of assessments made to ascertain the
presence and potential impact on other protected species, and NatureScot is satisfied with
this.  This will be followed through by a “Species Protection Plan” the details of which will be
obtained by way of planning condition.  
9.17 On balance, taking all the above factors into account, it is considered that the development
will not (as per the wording of this policy) have an unacceptable impact on the natural
environment and on this basis meets the terms of policy 4.       
9.18 Policy 5 Soils intends to protect carbon-rich soils, restore peatlands and minimise
disturbance to soils from development. Relevant parts of this policy are summarised as
follows: 
Development proposals will only be supported if they are designed and constructed:
• In accordance with the mitigation hierarchy by first avoiding and then minimising the
amount of disturbance to soils on undeveloped land; and
• In a manner that protects soil from damage including from compaction and erosion,
and that minimises soil sealing.
9.19  The development includes significant land engineering operations which the policy would
seek to avoid if possible, but the applicant argues that these works are necessary given that
the proposals have a specific locational need for the use of this site; that the extent and
nature of impacts on the soils has (in this context) been minimised as much as possible and
that the manner in which the soils will be managed complies with the policy above.   The
applicant argues that the hospital development should be seen in the context of the
proposed East Airdrie Link Road which will itself require significant alterations to ground
levels and soils.   Chapter 9 of the EIA report outlines the impact upon soil quality resulting
from the hospital proposals. In particular, topsoil on the site will be stripped prior to works
commencing and stored in embankments so it can be re-used. It is estimated that circa 75%
of the stripped topsoil will be reused on the site with the remaining 25% currently anticipated
as being disposed of off-site in accordance with best practice. It is understood that the
applicant continues to develop a strategy to minimise off site materials.   In order to ensure
that the topsoil quality is not diminished during the construction stage it is proposed that a
‘Soil Management Plan’ will be produced which sets out stripping, handling, storage and
reinstatement best practice. (This would be a requirement of a planning condition). 
Page 47 of 74

Page 48

9.20 In assessing the development against policy 5 and looking at the applicant’s case (as
summarised above) the fact that such significant works are required in order to create the
development footprint certainly weighs against the proposal, and it is clear that the intention
of policy 5 is to reduce such disturbance as much as possible.  However, it is also
acknowledged that the site selection process for a development of this scale and nature will
inevitably present very limited options, and in this regard, it is accepted that the mitigation
measures set out should ensure that the impact on soil quality will be minimised as much as
possible.   It is concluded therefore that the development proposals comply with policy 5. 
9.21 Policy 6 Forestry, Woodland and Trees intends to protect and expand forests, woodland
and trees.  Relevant extracts of this policy are as follows: 
o Development proposals that enhance, expand and improve woodland and tree cover will
be supported.
o Development proposals will not be supported where they will result in:
• Any loss of ancient woodlands, 
• Adverse impacts on native woodlands, hedgerows and individual trees of high
biodiversity value
• Fragmenting or severing woodland habitats, unless appropriate mitigation measures
are identified and implemented in line with the mitigation hierarchy;
o Development proposals involving woodland removal will only be supported where they
will achieve significant and clearly defined additional public benefits in accordance with
relevant Scottish Government policy on woodland removal.  Where woodland is
removed, compensatory planting will most likely be expected to be delivered.
o Development proposals on sites which include an area of existing woodland will only be
supported where the enhancement and improvement of woodlands and the planting of
new trees on the site are integrated into the design.
9.22 In response to this policy, the following is noted:
The 3 areas of significant tree cover on or near the development footprint are
• The woodland adjoining the east of the North Calder Water.  This is largely
unaffected by the development and in fact will benefit from biodiversity enhancement
measures.  
• The woodland area at the north-west corner of the site (which currently
accommodates the Noth Calder Trail.  This will accommodate a large section of the
proposed ATR which will result in a degree of tree loss, however this will be
mitigated through replacement tree planting. 
• Areas of woodland within the centre of the development footprint.  This would be
removed to accommodate the proposed development. The proposed landscape
strategy focuses on significant landscaping works in and around the hospital
complex and also mitigation by way of a 2.95ha community woodland located on the
north side of the proposed ATR (on the site of the old farm buildings). 
9.23 As noted in NatureScot’s consultation response (see paragraph 7.6 above) they are of
the opinion that some of the woodland on the site should be classified as ‘ancient’.  It
should be noted that there is no single database which confirms whether woodland is
‘ancient’ or not.  Ancient woodland is defined as “land which has maintained continuous
woodland habitat since at least 1750”.  It follows therefore that trees in an ancient
woodland need not in themselves be ‘ancient’.  The applicant, in preparing the EIA
report, concluded that there was no ancient woodland impacted by the development, but
it did acknowledge that there would be tree loss, most notably within the centre of the
development footprint (as noted above).  The impact of this loss was assessed and
mitigation (which would otherwise have been assessed as adequate) was put forward as
part of the planning application and EIA report.  NatureScot, in reviewing the planning
Page 48 of 74

Page 49

application and EIA report, concluded that this woodland (and other smaller areas of
woodland at the northeast corner of the site where the temporary construction access
crosses the North Calder Water) should be properly classified as ‘ancient’ and this is
accepted by the applicant.  
9.24 In recognition of the value and irreplaceable nature of ancient woodland, policy 6 of
NPF4 states that “Development proposals will not be supported where they will result in
any loss of ancient woodlands”.  Clearly, the proposals would fall into this category.
9.25 Looking at other criteria within this policy, the development will not result in the
fragmentation or severance of woodland habitats.  Also, it is accepted that in quantitative
terms, the new planting schemes provide adequate mitigation for the tree loss mentioned
above.  The new planting is also well integrated into the development and the locale.  
9.26 Policy 6 refers to the Scottish Government policy on the “Control of Woodland Removal”. 
That policy states that “woodland removal should be allowed only where it would achieve
significant and clearly defined additional public benefits”.  Public benefits are defined as
including social, economic and environmental benefits.  It is accepted that the proposals
will bring significant social benefits to a great many people by way of the improvements
to health care facilities.  However, the control of woodland policy also reinforces the
stance taken in policy 6 in having a strong presumption against removing ancient
woodland.  
9.27 Taking all of the above on board, with particular focus on the loss of ancient woodland, it
is not reasonable to conclude that the development accords with policy 6.  A wider
discussion on the merits of the proposal (in relation to the loss of ancient woodland and
the wider benefits of the proposal) can be found under “Other Material Considerations”
(paragraphs 10.7 – 10.9 below).   
9.28 Policy 7 Historic Assets and Places intends to protect and enhance historic
environment assets and places, and to enable positive change as a catalyst for the
regeneration of places.  Extracts of this policy (relevant to the proposals) are as follows: 
• Development proposals with a potentially significant impact on historic assets or places
will be accompanied by an assessment. 
• Development proposals affecting the setting of a listed building should preserve its
character, and its special architectural or historic interest.
• Development proposals in or affecting conservation areas will only be supported
where the character and appearance of the conservation area and its setting is
preserved or enhanced. 
• Where there is potential for non-designated buried archaeological remains to exist
below a site, developers will provide an evaluation of the archaeological resource at
an early stage so that planning authorities can assess impacts. 
Page 49 of 74

Page 50

9.29      In response to this:
• The EIA report concludes that impacts on nearby Conservation Areas and
Scheduled Monuments are negligible. There is potential for a slight adverse effect
on listed buildings at Easter Moffat (i.e. the golf club house and nearby houses)
and Wester Moffat hospital. However, visibility between these buildings and the
new hospital development is already limited due to topography and vegetation. The
proposed landscaping scheme would also help to mitigate any residual impacts.  
• In terms of impact on archaeological interests, the EIA report concludes that the
value of any archaeological remains discovered during construction would be ‘Low’.
It is intended that archaeological excavation will be undertaken in advance of
construction to assess and mitigate any impact upon heritage assets. 
• Historic Environment Scotland (HES) has no objections or comments to make and
the Council’s advisors on archaeology has no objections subject to planning
conditions to ensure archaeological assessment and recording.   
9.30  On this basis, the development is considered to comply with the requirements of Policy
7. 
9.31 Policy 8 Green Belts intends to encourage, promote and facilitate compact urban
growth and use the land around our towns and cities sustainably.  This policy is
summarised as follows: 
Development proposals within a green belt designated within the LDP will only be
supported if they are for:
• development associated with agriculture, woodland creation, forestry and existing
woodland (including community woodlands);
• residential accommodation required and designed for a key worker
• horticulture,
• outdoor recreation,
• flood risk management.
• essential infrastructure or new cemetery provision;
• minerals operations and renewable energy developments;
• intensification of established uses,
• the reuse, rehabilitation and conversion of historic environment assets; or
• one-for-one replacements of existing permanent homes. 
9.32 Clearly, the proposals do not fall into any of the categories of acceptable development
listed above and on this basis the development does not accord with policy 8.   Further
discussion on the impact on the Green Belt can be found in paragraphs 10.3 to 10.5
below.   
9.33 Policy 9 Brownfield, Vacant and Derelict Land and Empty Buildings seeks to
promote and facilitate the reuse of brownfield, vacant and derelict land and help reduce
the need for greenfield development.  Relevant parts of this policy are summarised
below:
• Proposals on greenfield sites will not be supported unless the site has been allocated
for development or the proposal is explicitly supported by policies in the LDP.
• Where land is known or suspected to be unstable or contaminated, development
proposals will demonstrate that the land is, or can be made, safe and suitable for
Page 50 of 74

Page 51

the proposed new use.
9.34  The application site is comprised of a greenfield site but it is not allocated for development
in the LDP and therefore application does not accord with the first criterion.  On the second
point, information submitted by the applicant demonstrates that any issues of ground
contamination will be properly addressed (subject to further information required by way of
planning condition) and this is supported by input from the Coal Authority and NLC
Protective Services.  
9.35  Despite according with the criterion on ground condition, it is clear that the focus of the
policy is on encouraging the re-use of brownfield land and away from greenfield land
(unless allocated in the LDP).  On this basis it must be concluded that the proposals do not
comply with policy 9.   
9.36 Policy 11 Energy intends to encourage, promote and facilitate all forms of renewable
energy.  Relevant extracts of this policy are summarised as follows: 
• Development proposals for all forms of renewable, low-carbon and zero emissions
technologies will be supported. These include small scale renewable energy
generation technology;
• project design and mitigation will demonstrate how the various environmental
impacts are addressed:
• significant weight will be placed on the contribution of the proposal to renewable
energy generation targets and on greenhouse gas emissions reduction targets. 
9.37 Although the intent of this policy is focused on developments for energy production (eg
wind farms) the application of this policy is relevant to this development given the
incorporation of the energy centre into the development.   
9.38 The applicant’s ‘Energy Strategy’ focusses on the use of heat source technology
including Air Source Heat Pumps, Water Source Heat Pump and Photovoltaics.   On this
basis, the applicant claims that the proposals will make a meaningful contribution to
renewable energy generation and reduction of greenhouse gas emissions thus assisting
in the ambition to make this the first Net Zero Carbon hospital in Scotland.  As a back-up
(and to meet NHS Scotland guidance on operational resilience) there are oil fired boilers
but these would only be used in emergencies.   
9.39 In considering the above, it is accepted that the proposals are consistent with Policy 11. 
9.40 Policy 12 Zero Waste intends to encourage, promote and facilitate development that is
consistent with the waste hierarchy.  Relevant extracts of this policy are summarised as
follows:
• Development proposals will seek to reduce, reuse, or recycle materials in line with
the waste hierarchy.
• Development proposals that are likely to generate waste when operational will set out
how much waste the proposal is expected to generate and how it will be managed. 
9.41  In response to this, the applicant notes that operational waste generated by the hospital
will be managed by NHS Lanarkshire itself and this will be informed by the relevant NHS
Scotland Waste Management Action Plan. As the new hospital is not due to open until
2031, the policies and proposals for operational waste management are in their infancy.
However, a draft waste strategy is included with this application to illustrate the direction
of operations.  For clarity, it is noted that incineration does not form part of the proposed
strategy.  During the construction phase, construction waste will be managed as part of
a Construction Environmental Management Plan (CEMP) details of which will be agreed
Page 51 of 74

Page 52

before works start on site.  
9.42 In assessing the above, it is accepted that the proposals are consistent with Policy 11
subject to a condition requiring a Construction Environmental Management Plan (CEMP)
before works start on site and a condition requiring an up-to-date operational waste
strategy before the hospital buildings become operational.   
9.43 Policy 13 Sustainable Transport intends to encourage, promote and facilitate
developments that prioritise walking, wheeling, cycling and public transport for everyday
travel and reduce the need to travel unsustainably.  Relevant extracts of this policy are
summarised as follows: 
Development proposals will be supported where it can be demonstrated that the
transport requirements generated have been considered in line with the sustainable
travel and investment hierarchies and where appropriate they:
• Provide direct, easy, segregated and safe links to local facilities via walking,
wheeling and cycling networks before occupation;
• Will be accessible by public transport, ideally supporting the use of existing
services;
• Integrate transport modes;
• Provide low or zero-emission vehicle and cycle charging points in safe and
convenient locations, in alignment with building standards;
• Supply safe, secure and convenient cycle parking to meet the needs of users and
which is more conveniently located than car parking;
• Are designed to incorporate safety measures including safe crossings for walking
and wheeling and reducing the number and speed of vehicles;
• Adequately mitigate any impact on local public access routes. 
Development proposals for significant travel generating uses will not be supported in
locations which would increase reliance on the private car, taking into account the
specific characteristics of the area. 
9.44 This policy is centred around the sustainable travel hierarchy which promotes walking,
wheeling, cycling and public transport over the use of the private motor car.  In order to
gauge whether the proposal has been considered in line with this hierarchy, the
following is noted: 
• The Transportation Assessment includes an estimate of how people will access
the new development and how this compares to the existing hospital.  The
majority of people accessing both the existing and proposed hospital will arrive by
private motor car (81% of visits rising slightly to 83% at the new site).  For those
arriving by public transport (with mitigation in place) it is estimated that there will
be slight increase (8% rising to 11%) whilst those arriving on foot is predicted to
go down from 5% to 0% (and this latter point forms the core of the concerns
outlined by Sustrans). 
• It is accepted that the application site is intrinsically less accessible than the
current site which is sandwiched between Airdrie and Coatbridge and (overall)
enjoys good levels of access by bus and rail.  Given the constraints imposed by
the site selection process, arguably it was inevitable that any new site would be
less integrated into the urban area (and hence less accessible on foot) than the
existing site. 
• Looking at the statistics summarised in the first bullet point above, the applicant
contends that the site does not “increase reliance on the private car” ,and that large
Page 52 of 74

Page 53

hospital developments are unique in terms of “travel generating uses” ‘with a
combination of variable shift patterns, 24-hour operation, length of stay and the
different needs of staff, patients, and visitors.  On this basis, they suggest that
most users of the hospital will choose the private motor car given the nature and
timing of most visits.  Finally, the applicant notes that the policy affords
consideration to the “specific characteristics of the site/area” which reinforces the
commentary above relating to the inevitable impact of the site selection process
on accessibility.  It is considered that there is merit in the applicant’s arguments
on this matter.   
• As noted earlier in the report, in order to achieve a net increase in accessibility by
bus, the new development will be the basis of a bus mitigation scheme which was
produced in conjunction with SPT.  Although only produced in draft form for now,
the detailed and final scheme will be carried out before 2031 (or whenever the
hospital is due to open) and will take account of circumstances at that time.  A
consideration for the proposed scheme will be how it integrates into other bus and
train services in and around the new hospital site.  In addition, the development
will accommodate a ‘transport hub’ at the main hospital entrance with bus
stances, shelters, real time bus information and so on. 
• Walking, wheeling and cycling networks are catered for by way of the proposed
segregated Active Travel Route. The applicant contends that the new route accords
with the criteria contained within policy 13 and in particular will be well lit and it has
been designed in accordance with industry guidance “Cycling by Design”. 
NatureScot and the Green Action Trust have expressed support for the design and
location of the ATR but NLC Traffic & Transportation, SPT and Sustrans have
expressed concerns and believe that its length and location through woodlands (with
a lack of proper surveillance) will hamper its usage.  In response to concerns
regarding safety, the applicant has noted that the route will be well lit (part of
Sustrans concerns is based on the misapprehension it would not be lit).  In addition,
there will be a security strategy in and around the hospital and this will include a
scheme of CCTV along the ATR.  Whilst not an optimal solution it is concluded that
the design and location of the ATR is acceptable.   
• Since submitting the planning application, requirements for EV charging
facilities in new development has been placed on the Building Regulations,
therefore this will be confirmed once the necessary warrant application is
submitted and approved.   
• A secure covered staff cycle storage hub is to be located in close proximity to
the western entrance along with suitable internal changing and shower facilities,
with separate public secure covered cycle storage at the western entrance. 
• In terms of providing proper safety measures, safe crossing points will be
provided on the key desire lines within the site, while speed reduction
measures will also be implemented to ensure that vehicle speeds remain
slow.  The applicant investigated the possibility of creating a new crossing
point on Towers Road at the end of the proposed Active Travel Route.  Given
the many constraints at that location (including the fact that several roads
meet at that point) it was concluded that a crossing point was not feasible at
that location.  Instead, any users of the ATR (travelling between Drumgelloch
Station and the hospital) would have to use the crossing point at the top of
Towers Road at the junction with Forrest Street.  Although less convenient,
Page 53 of 74

Page 54

this solution is acceptable and it is noted that NLC Traffic and Transportation
do not object to this element of the proposal,   
• In terms of mitigating any impact on local public access routes, it is noted that
there will be some temporary closures of footpaths during construction works
(particularly through the woodlands off Towers Road and leading to the North
Calder Water). However, suitable diversions will be signposted on site.  This has
been agreed with access officers in the Council. 
• In order to accommodate changes to local traffic patterns as a result of the
development, junction improvements are proposed at Towers Road/Forest
Street/Connor Street.  These works (in principle) are found to be acceptable.  
Further discussion on this matter can be found in paragraph 10.20 below. 
• A draft Travel Plan has been submitted with the planning application and has
been found to be acceptable.  A finalised Travel Plan will be prepared for
agreement and then implemented as the hospital opens. 
• It is noted that NLC Traffic and Transportation and SPT are largely supportive of
the proposals, subject to conditions and various provisos.   
• It is noted that Policy 13 is designed to address sustainable travel issues, and
therefore matters regarding the suitability of the vehicular access etc are best
addressed in NLLDP policy EDQ3 (see paragraphs 9.85 to 9.91 below).     
9.45 Looking at all of the above criteria, on balance it is concluded that the development
accords with NPF4 policy 13. 
9.46 Policy 14 Design, Quality and Place intends to encourage, promote and facilitate well
designed development that makes successful places by taking a design-led approach
and applying the Place Principle. Relevant to the development, this policy can be
summarised as follows:
• Development proposals will be designed to improve the quality of an area
whether in urban or rural locations and regardless of scale.
• Development proposals will be supported where they are consistent with the six
qualities of successful places, which are: Healthy, Pleasant, Connected,
Distinctive, Sustainable and Adaptable
• Development proposals that are poorly designed, detrimental to the amenity of
the surrounding area or inconsistent with the six qualities of successful places,
will not be supported.
9.47  In response to this the following is noted:
• The development in itself will bring significant health benefits to the wider
catchment area and this should be given significant weight.  
• The hospital design contains landscaped areas allowing for social interaction
and the development is integrated into the nearby path network allowing for
interaction with nature.  
• As noted in policy 13, connectivity to and from the site is deemed acceptable. 
• The design, layout and architecture are all considered to be appropriate. 
Further detailed assessment of this can be found in the assessment of
NLLDP policy EDQ3 at paragraphs 9.85 to 9.91 below.  
Page 54 of 74

Page 55

• The new hospital will be Scotland’s first net zero hospital.
• The design and layout already allows for future expansion areas. 
9.48  Based on the above, it is accepted that the proposals accord with policy 14.   
9.49 Policy 18 Infrastructure First intends to encourage, promote and facilitate an infrastructure
first approach to land use planning, which puts infrastructure considerations at the heart of
placemaking.  Relevant to the development, this policy can be summarised as follows:
• Development proposals which provide (or contribute to) infrastructure in line with
that identified as necessary in LDPs and their delivery programmes will be
supported.
• The impacts of development proposals on infrastructure should be mitigated.
Development proposals will only be supported where it can be demonstrated that
provision is made to address the impacts on infrastructure. 
9.50 The application of this policy is most relevant in relation to transportation matters.  In
particular, the development is dependent on the Council (as part of the City Deal project)
constructing the EALR and this is discussed in more detail in paragraphs 3.7 & 10.10.  Also,
the development will be dependant, initially, on the proposed bus service scheme to ensure
adequate public transport infrastructure, and again this is discussed in more detail in
paragraph 9.43.   At a smaller scale, there will be other impacts on local utilities and the
applicant has submitted various documents (including a Utilities Statement, and a Drainage
Strategy) which outlines these impacts and how they will be mitigated (if required).  These
are summarised as follows:
• Electrical - There are significant electrical services on the site including a 275kV
transmission network with pylons, a 33kV overhead electrical line and 33kV
underground electrical line.  These will be diverted by Scottish Power Energy
Networks under a separate consent process (see paragraph 5.4 above).
• Telecoms - it is not envisaged that there will be any major telecoms diversion works
required. 
• Gas - Discussions with Scottish Gas Networks (SGN) have confirmed that an
abandoned high pressure gas main which runs through the site can be removed. 
• Water - There is an existing private water supply running from east to west across the
site. Discussions are ongoing between the applicant and Scottish Water. 
• Drainage The accompanying Drainage Strategy confirms that appropriate
infrastructure will provide the development with disposal of surface water and foul
drainage. 
9.51 In reviewing the applicant’s submissions, it is noted that all consultees with a remit on these
matters (including Scottish Power Energy Networks, Scottish Water, SEPA, NLC
Transportation and SPT) have confirmed that they have no objections to the proposals
subject to conditions where required. Taking all of this on board, it is accepted that the
development meets the terms of policy 18.   
9.52 Policy 19 Heating and Cooling intends to encourage, promote and facilitate development
that supports decarbonised solutions to heat and cooling demand and ensure adaptation to
more extreme temperatures.  A relevant extract of this policy is as follows:
• Development proposals for buildings that will be occupied by people will be supported
where they are designed to promote sustainable temperature management, for example
by prioritising natural or passive solutions such as siting, orientation, and materials. 
Page 55 of 74

Page 56

9.53  The outcome of this policy is firstly to ensure that new developments are connected to
expanded heat networks where they exist (that does not apply in this instance) and
secondly to ensuring that buildings are adapted to more extreme temperatures.  In
response to this, the applicant notes that the proposed Air Source Heat Pumps, Water
Source Heat Pumps, and photovoltaics will feed into the central ‘low temperature hot
water heating system’, whilst cooling would come from a central chilled water system.  
Also, the heating, ventilation and air conditioning systems would be designed to promote
sustainable temperature management, incorporating heat recovery and also providing
local control (eg down to including individual rooms). 
9.54  On the basis of the above, it is accepted that the development complies with policy 19. 
9.55 Policy 20 Blue and Green Infrastructure intends to protect and enhance blue and green
infrastructure and their networks.  Relevant to the development, this policy can be
summarised as follows:
• Development proposals that result in fragmentation or net loss of existing blue and green
infrastructure will only be supported where it can be demonstrated that the proposal would
not result in or exacerbate a deficit in blue or green infrastructure provision, and the
overall integrity of the network will be maintained. 
• Development proposals for or incorporating new or enhanced blue and/or green
infrastructure will be supported. 
• Development proposals that include new or enhanced blue and/or green infrastructure
will provide effective management and maintenance plans covering the funding
arrangements for their long-term delivery and upkeep, and the party or parties
responsible for these.
9.56  In response to this, it is noted that the key piece of blue infrastructure within the site is the
North Calder Water which runs through the site.  In terms of physical works, the North
Calder Water will be impacted in 3 main ways, these being the creation of the ATR bridge,
the creation of the temporary construction access bridge and finally the SUDS
infrastructure.  Otherwise there is a buffer between the development footprint and the North
Calder Water.  None of this will result in the loss or fragmentation of the North Calder
Water as a piece of blue infrastructure, and indeed the creation of the network of SUDS
basins will add to it.  
9.57  In terms of green infrastructure, the same buffer referred to above allows for the integrity of
woodland alongside the North Calder to be maintained and enhancements are planned by
way of the new community woodland.  This new woodland was originally conceived to
replace and enhance woodland cover on the site, partly in recognition of the loss of an area
of woodland within the centre of the development footprint.  Since then, as noted in
paragraph 7.6, it is now concluded that this woodland can be described as ‘ancient’.  
9.58  Despite the loss of the ancient woodland (which is addressed in policy 6 above) it is
concluded that on balance the proposals accord with the spirit of policy 20.   
Page 56 of 74

Page 57

9.59 Policy 22 Flood Risk and Water Management seeks to strengthen resilience to flood risk
by promoting avoidance as a first principle and reducing the vulnerability of existing and
future development to flooding.  Relevant to the development, this policy can be summarised
as follows: 
Development proposals at risk of flooding or in a flood risk area will only be supported if
they are for essential infrastructure where the location is required for operational reasons.
Development proposals will:
• not increase the risk of surface water flooding to others, or itself be at risk.
• manage all rain and surface water through sustainable urban drainage systems
(SUDS), 
• seek to minimise the area of impermeable surface.
Development proposals which create, expand or enhance opportunities for natural flood risk
management, including blue and green infrastructure, will be supported.
9.60  As noted earlier, the application has been accompanied by a Flood Risk Assessment (FRA)
and Drainage Strategy. It is noted that the site sits in an elevated position well above the
nearby North Calder Water.  The hospital use is classified by SEPA’s Land Use
Vulnerability Classification as a ‘Most Vulnerable Use’ and on this basis is required to be
located within an area with little or no risk of watercourse flooding and must be located
outwith areas with the risk of a 1 in 1000-year storm event.  In reviewing the planning
application and EIA report (including the FRA) SEPA notes that the water level of the North
Calder Water varies between 132.4m AOD and 147.7m AOD and that the finished floor
levels of the hospital will be 161m AOD (ie the entire hospital complex will be more than
20m above the level of the river).  It also notes that the development footprint will be at least
80m from the river.  Based on this (and other considerations of the design and layout) SEPA
has confirmed that it is satisfied with the proposals in relation to flood risk and (in its opinion)
the development meets the terms of policy 22.  
9.61  Subject to planning conditions (relating to surfacing, SUDS and ground water) it is
concluded that the proposals comply with policy 22. 
9.62 Policy 23 Health and Safety seeks to protect people and places from environmental harm,
mitigate risks arising from safety hazards and encourage development that improves health
and wellbeing.  Relevant extracts from this policy are summarised as follows:
• Development proposals will be supported where they 
• have positive effects on health;
• are for health and social care facilities and infrastructure
• Development proposals will not be supported where they
•  have a significant adverse effect on health
• have significant adverse effects on air quality
• raise unacceptable noise issues
• Development proposals will be designed to take into account suicide risk.
• Development proposals within the vicinity of a major accident hazard site will consider the
associated risks and potential impacts of the proposal and the major accident hazard site
of being located in proximity to one another. 
Page 57 of 74

Page 58

9.63  In response to this policy, it is noted that: 
• The development in itself will clearly lead to a significant improvement to health
care facilities for many people.   
• The application has been accompanied by suitable assessments for noise and
air quality, both of which conclude that there are no unacceptable impacts in
these regards.
• In terms of suicide risk, all areas of buildings at height and roof areas will be
restricted or feature appropriate design.  Given the height of the bridge carrying
the active travel route, potential suicide risk has been a factor in the design and
layout of that structure.  Further details of this will be provided by way of a
planning condition.  
• The proposals sit within proximity of Inverhouse Distillery.  The Health & Safety
Executive has established a consultation zone around the distillery to ensure
that any safety implications associated with the storage of large amounts of
alcohol are properly addressed.  In this case the consultation zone extends into
the planning application boundary of the hospital but it does not impinge on the
development footprint.  On consulting the HSE on the proposed development,
it confirmed that it has no objections.   
• NLC Protective Services have reviewed the Noise Impact Assessment and Air
Quality Assessment which accompanied the planning application and which
formed part of the EIA.  They accept that the impacts on both counts will be
within acceptable limits and offered no objections subject to conditions.   
9.64 On this basis it is accepted that the proposals are in accordance with policy 23.   
9.65 Policy 24 Digital Infrastructure seeks to encourage, promote and facilitate the roll-out of
digital infrastructure across Scotland.  Relevant extracts of this policy are summarised as
follows:
o Development proposals that incorporate appropriate, universal, and future-proofed
digital infrastructure will be supported.
o Development proposals that deliver new digital services or provide technological
improvements, will be supported.
9.66  Whilst it is clear that this policy is more focussed on new digital infrastructure (eg new telecoms
apparatus, for example as opposed to new health care facilities) the applicant has suggested
that weight should be given to the fact that the new facility will be “Scotland’s first digital
hospital”.  The land use implications of this may be limited but the applicant makes it clear
that their ambition to maximise the use of technology (which is being integrated into the
initial design and layout of the new buildings) will bring meaningful benefits to healthcare
provision.   On this basis, it is accepted that the development complies with the spirit of
policy 24.   
Page 58 of 74

Page 59

9.67  Policy 27 City, Town and Local Commercial Centres seeks to encourage, promote and
facilitate development in town centres including the application of the Town Centre First
approach.  Amongst other criteria, this policy states that proposals for uses which will generate
significant footfall, including healthcare facilities, will not be supported outwith town and commercial
centres unless a town centre first assessment demonstrates that: 
o all centre and edge of centre options have been sequentially assessed and discounted
as unsuitable or unavailable;
o the scale of development cannot reasonably be altered or reduced in scale to allow it
to be accommodated in a centre; and
o the impacts on existing centres have been thoroughly assessed and there will be no
significant adverse effect on the vitality and viability of the centres. 
9.68 In terms of considering all sites as part of the site sift, the applicant points out that the Town
Centre First approach was part of the site selection process but (for obvious reasons given
the scale and nature of the proposals) there were no town centre or edge of centre options
available.  The applicant points out by way of comparison that the actual development
footprint of the new hospital (33.7ha) would take-up most of Airdrie town centre (approx.
50ha.).  
9.69 In terms of whether the scale of the development could be reasonably altered or reduced in
scale to allow it to be accommodated in a centre, the applicant reiterates that the minimum
site size requirements (40 acres/ 16.2ha) were set by NHS Lanarkshire’s clinical model and
cannot be reasonably reduced. Indeed, the site size requirements to deliver the new hospital,
with all associated services, car parking and infrastructure is 33.7ha. This is larger than the
existing (constrained) edge of centre hospital site (approx. 12ha).  The scale of development
is required to meet identified existing and future healthcare needs, and the selected site must
be capable of accommodating future expansion. Accordingly, the applicant concludes that
the scale of development cannot reasonably be altered or reduced to allow it to be
accommodated in a centre/edge of centre location and these arguments are accepted.    
9.70 In terms of the impacts of the new development on existing centres, it is noted that the
existing hospital site is currently located at the edge of Airdrie centre. The Transport
Assessment submitted with the application notes that the majority of existing staff and
visitors reach the exiting hospital via car, and on this basis the applicant suggests that there
is limited interaction outwith the hospital complex and this is likely to remain the case in the
new site.   It is reasonable to conclude, therefore that the new development will not have a
significant adverse effect on the viability or vitality of any nearby centres. 
9.71 Based on the above, it is accepted that the proposals accord with the spirit of policy 27.   
9.72 NPF4 SUMMARY 
Whilst NPF4 is designed to be read as a whole document, and it is accepted that the
proposals are compliant with many policies of NPF4, it fails to accord with certain key
policies, these being: 
• Policy 6 - Forestry, Woodland and Trees  
• Policy 8 - Green Belts and, 
• Policy 9 - Brownfield, Vacant and Derelict Land and Empty Buildings 
Page 59 of 74

Page 60

9.73 NORTH LANARKSHIRE LOCAL DEVELOPMENT PLAN 2022
The NLLDP 2022 represents North Lanarkshire Council’s most up to date Local
Development Plan position, prepared in line with the national and strategic planning policy
context at the time – notably Clydeplan and Scottish Planning Policy. In application of the
policies of NLLDP 2022, consideration is given to the Transitional Arrangements guidance on
NPF4 becoming part of the statutory ‘development plan’ alongside local development plans
(LDPs). The Chief Planner letter of 8th February 2023, states that ‘…in the event of any
incompatibility between a provision of NPF and a provision of an LDP, whichever of them is
the later in date is to prevail.’ As NPF4 is the latest adopted policy document, its policies are
treated as taking primacy. The paragraphs below offer a response to those policies
considered relevant. 
9.74 The NLLDP identifies the entire site (with the exception of the existing Wester Moffat
Hospital, which includes part of the Active Travel Route) as being part of the Green Belt.  
Policy PP4 (Purpose of Place – Green Belt) seeks to maintain the integrity of the existing
Green Belt by resisting proposals for uses other than those specified in the policy. Relevant
extracts of this policy are as follows: 
North Lanarkshire Council will protect the setting of communities, support
regeneration by directing growth to urban areas, protect natural assets and provide a
high-quality environment, by promoting a Green Belt as defined on the Promote Map
and North Lanarkshire Council will encourage development appropriate for a Green
Belt location by resisting development that is not for agriculture, forestry, recreation,
tourism, or needs a Green Belt location. 
9.75 Clearly, the proposed development is not for agriculture, forestry, recreation or tourism. 
Furthermore, whilst appreciating the significant constraints imposed on NHS Lanarkshire in
terms of the site selection process, it cannot be reasonably argued that the proposed
development requires a Green Belt location over and above any other location.  On this
basis it must be concluded (as with policy 8 of NPF4- (Green Belts) that the proposed
development does not accord with policy PP4 (Green Belt) of the NLLDP.  This policy goes
on to provide criteria for assessing proposals in the Green Belt but this only applies to
development which needs a Green Belt location and therefore is not relevant to the
assessment of this policy (although it can be taken on board in the ‘Material Consideration’
section below.)   
9.76 Policy AD4 (Amount of Development – Green Belt) states that: 
“Applications for planning permission for new development will be assessed for their
implications related to the amount of development proposed.” 
9.77 In particular, it asks that any development within class 8 of the Use Class Order (including
hospitals) should be the basis of a sequential approach.  It is noted that the sequential test
was addressed in paragraph 9.67 above (NPF4 Policy 27) and it is also noted that none of
the 3 sites in the short list were within areas listed in the sequential test.   
9.78 Arguably, this policy seeks to direct developments to suitable sites in a particular sequence,
and given that (sequentially) the applicant has made a positive case for choosing this site, it
can also be concluded that the development accords with the spirit of policy AD4. 
Page 60 of 74

Page 61

9.79 Policy Prot A (Natural Environment and Green Network Assets) states that “The Council will
protect natural and resilient sustainable places by safeguarding natural heritage assets.”  In
response to this, the following is noted: 
• In relation to SSSI’s, it has already been accepted by NatureScot that the development
will not impact unacceptably on the nearby Lady Bell’s Moss SSSI.
• In terms of Ancient Woodland, the policy asks that the Scottish Government’s “Control of
Woodland Removal Policy” should be adhered to.  In that document, it is stated that there
will be a strong presumption against removing ancient woodland (and this is also
reflected in NPF4 Policy 6 – Forestry, Woodland and Trees). 
• In terms of impacts on the Urban Green Network, SINCs (Sites of Interest for Nature
Conservation of which there are 2 within the site), impacts on town parks (in this instance
(Katherine Park), core paths and rights of way (ie the network of public paths in and
around west corner of the site where the proposed Active Travel Route meets Towers
Road) it has already been concluded in the assessment of NPF4 that impacts on these
resources can be adequately protected and or mitigated. 
9.80 As with policy 6 of NPF4, it is noted that Policy Prot A offers many aspects of the
development support, but given the value placed on retaining ancient woodland, it must be
concluded that the proposals are (on balance) contrary to the aims of Policy Prot A.   
9.81 Policy C1 (Contributions to Infrastructure) is relevant.  It states that “North Lanarkshire
Council will seek to secure developer contributions for new developments that, individually or
cumulatively, generate a requirement for new or enhanced infrastructure or services,”
covering (amongst other things) transport. In this regard the proposed public transport
scheme (as outlined in paragraph 7.3 above) has been found to be acceptable.  Once the
bus transport scheme has been finalised (before the hospital opens) then NHS Lanarkshire
will be responsible for providing payments (for use by SPT) to ensure that the approved bus
scheme can be implemented and any new contracts are procured and paid for by the
applicant.  On this basis, the proposals are deemed to be in accordance with Policy C1.   
9.82 Policy EDQ1 (Site Appraisal) states that “Any proposed development will require to be
appraised in terms of the site and its surroundings to ensure it will integrate successfully into
the local area and avoid harm to neighbouring amenity.” The policy provides a
comprehensive list of supporting information and assessments that should accompany
planning applications.  Following assessment of the planning application and all supporting
information (including the EIA Report and the Design and Access Statement) it is accepted
that there is sufficient information on which to come to a conclusion on the planning
application and its impacts, other than specific matters where planning conditions can be
used which require further information or clarity.  On this basis, it is agreed that the proposals
are in accordance with policy EDQ1.   
9.83 Policy EDQ2 (Specific Features for Consideration) states that “The Council will expect
applications for Planning Permission to be accompanied by an assessment of how
constraints affect sites dependant on the characteristics of the site, its surroundings and the
form of development.”  In this instance the following constraints are relevant: 
• HSE Hazard Consultation Zones; Flood Risk; Contaminated Land; Ground Instability
(coal mining); pipelines and cables. 
9.84 As noted in the summary of consultation responses (in section 7 above) and the assessment
of NPF4, it is accepted that these matters have been adequately addressed within the
planning application and on this basis, it is concluded that the proposal accords with Policy
EDQ 2.
Page 61 of 74

Page 62

9.85 Policy Prom EDQ 3 (Quality of Development) states that “Development will only be
permitted where high standards of site planning and sustainable design are achieved.” 
Looking at the criteria outlined in this policy, it is noted that the majority overlaps with policies
in NPF4 and therefore it is not necessary to address many of the points again (for example
sustainable access, climate change, pollution impacts and so on).  However, there are some
criteria in Policy EDQ 3 which remain to be addressed, namely: 
• Appropriate design principles (siting, design, external appearance and so on)
• Adequate open space areas and
• Sustainable access for cars 
9.86 These matters are addressed as follows: 
Design Principles
9.87    The EIA report included a Landscape and Visual Impact Assessment (LVIA) of the proposed
development.  Those most likely to be impacted by the development are walkers along the
North Calder Heritage Trail and other local path networks, residents in the neighbourhoods
close to the site, and local road users.  It should also be remembered that the landscape and
visual impact of the hospital will be seen in the context the new EALR.   
9.88 The most prominent views of the built development would be from the elevated areas
southwest of the site (ie in the raised areas in and around the southern stretch of Towers
Road and Craigends Road) where in some viewpoints the 4 storey ward wings would be
clearly visible as a prominent new feature above the horizon.  Other viewpoints (eg from
Forest Street halfway between Airdrie and Plains) would have the hospital being clearly
visible but due to local topography the structures would nestle more comfortably into the
local landscape and would not be visible above the horizon with the large Inverhouse
distillery structures as backdrop. Otherwise, local topography, tree cover and urban
structures will restrict many viewpoints of the site. The LVIA accepts that impacts on certain
viewpoints will be significant and that the new hospital development would become a
noticeable new feature at the edge of Airdrie, but its visibility would be contained to a
relatively small area.  The report also concludes that the development’s design and
landscaping would ensure that it would integrate successfully into the local area and this is
accepted.  The design and appearance of the structures themselves is varied with the ward
wing being designed with residential blocks in mind, whereas the main hospital building
would have an appearance more typical of a modern hospital block.  Similarly, the choice of
material is varied.  All of this is deemed to be appropriate for the site.   
Open Space
9.89 There are no stipulated standards (by the Council, Scottish Government or others) for
minimum open space provision within new hospital developments.  However, it is reasonable
for adequate provision to be made not only for patients but for staff (during breaks etc).  The
development includes internal courtyard areas (primarily for use by patients) and other
external landscaped open space areas with seating etc for use by staff.     
Access by Cars
9.90 Sustainable access issues have been addressed in paragraph 9.43 above (NPF4 Policy 13 –
Sustainable Transport) but the suitability of access by vehicles remains to be reviewed.  As
noted earlier in this report, NLC Traffic & Transportation believe that the proposed access
onto the new EALR will offer a good level of accessibility for vehicular travel to the site from
the surrounding road network are largely satisfied with vehicular access proposals subject to
the following: 
Page 62 of 74

Page 63

• In order to accommodate traffic from the development, the EALR must be operational in
its entirety (this is supported by the Transportation Assessment).   
• In principle, the approach taken to providing the off-site road improvements at Towers
Road/Forrest Street/Connor Street is acceptable subject to further detail being provided. 
These works should be operational before the hospital opens to the public.   
• The internal layout of the development (including parking) is acceptable.   
• There should be close co-operation between NHS Lanarkshire and the City Deal team to
ensure that both projects can progress in a timely fashion and with no conflicts.   
• The recommendation for a Construction Traffic Management Plan is noted and will be a
requirement of a planning condition.   
• Whilst the proposed access onto the EALR will offer good access to the wider area, it is
suggested that the lack of secondary access (which forms a part of many hospitals of this
scale) in this instance means that accessibility by nearby communities will be more
limited.  This matter (along with associated concerns regarding access on foot,
wheelchair and cycle) are addressed in paragraph 10.17 below.  It should be noted that
these concerns expressed by NLC Traffic & Transportation do not amount to an
objection. 
9.91 It has already been concluded that the development complies with many criteria outlined in
Policy EDQ 3 (ie the policies which overlap with NPF4).  On the basis that the 3 remaining
relevant criteria are also acceptable, it can be concluded that the development complies with
policy EDQ 3 in its entirety.   
9.92 Policy PROT B (Historic Environment Assets) addresses (amongst other things)
development which may impact on the setting of category B & C Listed Buildings as well as
impacts on sites of archaeological interest.  These matters have been assessed as part of
Policy 7 of NPF4 (Historic Assets and Places) where it was found (with suitable conditions
relating to further archaeological investigation) that the impacts were within acceptable limits. 
On this basis, it is also concluded that the proposal accords with NLLP Policy Prot B.   
9.93 NLLDP SUMMARY 
As with NPF4, the proposals are considered to respond positively to many of the relevant
NLLDP policies, but they do not accord with the following: 
• Policy PP4 (Purpose of Place – Green Belt) 
• Policy Prot A (Natural Environment and Green Network Assets) 
9.94 Development Plan Assessment - Conclusion
Both parts of the development plan are designed to be read as a whole and in the round and
it is noted that NPF4 and the NLLDP both offer the development much support on several
fronts.  However, the proposed development fails to meet key polices relating to the Green
Belt, unplanned development on greenfield land and will result in the loss of ancient
woodland. On that basis (and given the scale of the development) it is concluded that the
development constitutes a significant departure from the development plan.  Based on
Section 25 and 37(2) of the Town and Country Planning Act 1997 (as amended) the planning
application should therefore be refused planning permission unless there are material
considerations which suggest otherwise.  Relevant material considerations are outlined and
discussed below.    
Page 63 of 74

Page 64

10       Other Material considerations 
Need for New Facilities  
10.1 It is clear that there is a pressing need for a new hospital complex to replace the existing
facility.  In its submissions as part of the site selection process, NHS Lanarkshire stated that:
“The existing Monklands Hospital is now more than 40 years old and will struggle to adapt to
the rapidly changing needs of the future healthcare environment and its associated
infrastructure”.  In itself, the new development will address many shortcomings of the current
facility and this should be given significant weight when assessing the merits of the
proposals.  Moreover, it is clear from other submissions from NHS Lanarkshire, that the new
hospital is being treated as much more than just a construction project; and that the
opportunity is being taken to combine the advantages of the new development with new
ways of doing, including the use of new technology (by way of the “Digital Hospital” moniker). 
All of this will undoubtedly result in significant benefit to a great many people in terms of
enhanced healthcare, and again this is a significant material consideration weighted in favour
of the proposed development.   
10.2 Site Selection
The applicant has set out reasonable land use and clinical reasons why the scale and nature
of the development cannot be reduced or altered and thus be accommodated within the
urban area and on a site where zoning would allow for a hospital development.  Bearing in
mind the restrictions placed on the applicant in terms of site selection, it was also unlikely
that there would be sites forthcoming which would meet the requirements of the development
plan in terms of zoning.  The site selection process is therefore considered to be another
factor which weighs heavily in favour of approving a development which does not accord with
land use zoning. 
10.3 Impact on the Green Belt
As noted above, one of the key reasons for the development being held to be a significant
departure from the development plan is the fact that the site is within the Green Belt, and the
relevant policies (Policy 8 of NPF4 and Policy PP4 of the NLLP) presume against
developments such as this.  However, policy 8 of NPF4 provides criteria for new
development in the Green Belt.  This criteria is designed to apply in instances where the
policy allows for new development in the Green Belt (which does not apply in this instance)
but nevertheless the criteria should be useful in assessing the impact of the development on
the Green Belt.  The criteria is as follows: 
• reasons should be provided as to why a green belt location is essential and why it
cannot be located on an alternative site outwith the green belt;
• the purpose of the green belt at that location should not be undermined;
• the proposal should be compatible with the surrounding established countryside and
landscape character;
• the proposal has been designed to ensure it is of an appropriate scale, massing and
external appearance, and uses materials that minimise visual impact on the green
belt as far as possible; and
• there will be no significant long-term impacts on the environmental quality of the
green belt. 
Page 64 of 74

Page 65

10.4 In response to the above: 
• As established earlier in the report, the site selection process demonstrates that there are
very few suitable sites for this development which are available.  Of the 3 sites in the
short list, 2 are in the Green Belt and only 1 (Gartcosh) is in the urban area but that is
zoned for strategic business purposes which is also deemed unsuitable (in policy terms)
for a new hospital.  That site was found (by the applicant) to be less suited to their needs
than the Wester Moffat site for several reasons.  Accordingly, whilst the applicant cannot
reasonably say that the Green Belt is the only suitable location for the development, the
site selection process points towards this site as being most suited to the needs of the
applicant.  Similarly, the limited choice of sites has also meant that a greenfield site has
been chosen (and this conflicts with NPF4 policy 9 which promotes development on
brownfield land and presumes against development of greenfield land with no
appropriate land use zonings).  It is noted that there is in fact no site allocated in the
NLLDP for a replacement hospital, and that is largely down to issue regarding timing (i.e.
a miss-match of timing in the identification of the new hospital site and the preparation
and adoption of the 2022 NLLDP). 
• The purpose of the Green Belt in this location is many fold.  It is designed to protect the
character and setting of the urban area, it is designed to prevent urban sprawl and it is
designed to direct development to more appropriate locations.  In this instance the new
EALR will inevitably redefine the character and appearance of the east part of Airdrie. 
Also, the new road would define a new and defensible boundary to the Green Belt and so
the new hospital development would not be a starting point for further development.  The
proposed landscape strategy (including the new community woodland) would assist in
integrating the new development into the new edge of the urban area.  Finally, as noted
above, the fact that the options for site selection are so limited means that this
development should not be seen as directing development away from more suitable sites
in the urban area.   
• In terms of scale and massing and its impact on the Green Belt, it is noted that the
development would be seen very much as an addition to the existing urban area, and not
an isolated stand-out feature in the Green Belt.   
• In terms of environmental quality, the proposed landscape strategy and biodiversity
enhancements, along with long term management, should mean that there are no
significant adverse impacts on the quality of the Green Belt.     
10.5 Taking all of the above on board, whilst the proposal is clearly a departure from Green Belt
policy, it is concluded that the purpose and character of the Green Belt should not be
adversely impacted. 
Economic Benefit
10.6 As noted earlier in the report, it is estimated that the proposals will result in the creation of an
estimated approximately 146 net additional jobs, of which approximately 102 are estimated
to be taken up by residents of North Lanarkshire.  The construction period will result in the
equivalent of 1574.8 jobs during the 6-year build programme.  Whilst these benefits may not
be significant, they remain a benefit to the local economy and therefore should weigh in
favour of the development.   
Page 65 of 74

Page 66

Impact on Ancient Woodland
10.7 Following the consultation response from NatureScot, it was established that some areas of
woodland (shown in the planning application as being removed) should be classified as
“ancient woodland”. The areas of woodland in question are principally 3 groupings of trees
located within the centre of the development platform although the creation of the temporary
construction access road will also have a slight impact as well.  The 3 groupings amount to
250 trees and the trees themselves are categorised as having moderate value.   
10.8 The Scottish Government’s policy on control of woodland removal states that there is a
strong presumption against removing ancient woodland and this approach has been fed into
the development plan, hence the conclusion that the proposals do not accord with NPF4
policy 6 (Forestry, Woodland and Trees) and NLLDP Policy Prot A (Natural Environment and
Green Network Assets). 
10.9 Given the great value that is placed on ancient woodland, the resource is considered to be
irreplaceable and accordingly, mitigation is essentially by avoidance.   In this instance
avoidance is not a reasonable option given that the ancient woodland in question is within
the development footprint and retention would effectively mean relocating the hospital in an
entirely different location within the site.  Whilst NPF4 policy 6 states that any loss of ancient
woodland will not be supported, it also states that development proposals involving woodland
removal will only be supported where they will achieve clearly defined public benefits (these
being defined as social, economic and environmental).  In this case, it is clear that the social
benefits of the new hospital (accrued by way of the provision of enhanced health facilities)
will be significant and will benefit a great many people within a wide area. Furthermore, it has
already been established that there will be economic benefits as well.  It is considered that
this should carry significant weight when concluding the merits of the proposal including the
acceptability of the loss of the ancient woodland.  In terms of achieving some form of
mitigation for the loss of ancient woodland, the applicant suggested a Compensation and
Management Plan.  This would be prepared by an arboriculture specialist and would include
a detailed assessment of ancient woodland and detail the potential mitigation measures in
line with the hierarchy identified by NatureScot. This would include the re-use of the soils
from the site of the ancient woodland for use elsewhere (such soils are identified as having
notable qualities).  It is suggested that this compensation plan could be achieved by way of
planning condition.  Whilst the loss of the ancient woodland is regrettable, the proposed
mitigation measures, along with the significant weight given to the public benefits of the
hospital development, suggest that this is a justifiable way to proceed on this matter.   
EALR/Phasing
10.10 The dependency of the development on a new road which does not have planning
permission may appear unusual.  However, members should be reassured that across the
country this scenario is not unique, and in terms of planning process it is competent for NHS
Lanarkshire to submit their planning application at this time.  This position was confirmed in
pre-application discussions between the Council and NHS Lanarkshire, which included each
side taking their own legal advice. 
10.11 It must be stressed that this approach is not without risk.  The EALR is a key component of
the Council’s ambitious City Deal project and this is progressing well, with Outline Business
Case expected to be presented for approval in August 2024.  Also, design consultants have
recently been appointed with a view to submitting a planning application in 2025 which will
allow (subject to approvals) the new road to be open in 2030.  However, until such time as
the road is complete and open to traffic, there are many reasons why the EALR project may
be significantly delayed or may not go ahead, and NHS Lanarkshire is aware of these risks. 
Page 66 of 74

Page 67

10.12 In addressing and minimising these risks as much as possible, one approach open to the
Council could be to grant planning permission for the new hospital subject to a condition
which prevents any construction work starting on site until the new road is complete and
open to traffic. This would mean that construction works on the new hospital would not start
until 2030 at the earliest and a possible opening date of around 2036 or thereabouts. Given
the pressing need to see the new hospital open as soon as possible, NHS Lanarkshire has
put forward an alternative scenario whereby (subject to planning permission being granted)
the advanced enabling works (i.e. the site preparation and creation of the development
platform) would start in and around 2025.  It is possible that this decision would have to be
taken in advance of any planning permission for the road being in place and in advance of
the FBC (Full Business Case) for the hospital being signed off by the Scottish Government. 
In terms of risk to the applicant, there would still be the possibility that the road may not
proceed and therefore the enabling works would be redundant.  As well as being a risk for
NHS Lanarkshire, this would pose an environmental risk, as the advanced enabling works
would have an environmental impact but without any longer terms benefit from the new
hospital.  This particular risk could be mitigated (in part) by a planning condition requiring any
long-term delay in completing the project to be the basis of a scheme of works designed to
see the development platform being greened over.   
10.13 Thereafter, the most significant risk would be that construction of the hospital was started
(and the works possibly completed) but that the road was not completed on time or delayed
indefinitely. One approach to addressing this risk could be applying a planning condition
which linked the start date for the construction of the hospital buildings to a particular
milestone associated with the EALR project (e.g the award of a contract to build the road).  In
this regard, NHS Lanarkshire has argued that this approach is unnecessary and could hinder
the hospital project unduly.  It has, instead, suggested that the only planning condition in this
respect should be a simple one which states that the completed hospital development should
not open until the EALR is open in its entirety.  They say that the risk of a complete and
unoccupied hospital (with no vehicular access) is highly unlikely and in this case would be
carefully managed by NHS Lanarkshire and overseen by NHS Scotland and Scottish
Government.  Furthermore, the co-ordination of the hospital and EALR proposals are the
basis of a joint working party between NHS Lanarkshire and the Council.  On balance, from a
planning perspective, this approach is accepted. 
10.14 There is a further possible argument that a decision to grant planning permission for the new
hospital will in some way help pre-judge the outcome of the planning process for the new
road, but this is not accepted. The Council’s commitment to the EALR is certainly noted (and
in this case was a key determining factor in NHS Lanarkshire’s decision to choose this site
for the new hospital) but the planning process for the new road will be subject to the same
scrutiny and transparency as any other planning application of that scale and nature. 
10.15 There is also the potential risk of conflicts on the ground associated with 2 large, complex,
lengthy and potentially competing construction projects taking place side by side at the same
time.  This is not a planning consideration but is a matter that would be addressed together
by the Council and NHS Lanarkshire in the joint working party.   
10.16 The design and layout of the new hospital proposal is based on the assumption that the
proposed EALR will be sited in and around the line of the ‘preferred option’ as already
agreed in principle by the Council.  Clearly, confirmation of this alignment is subject to
detailed design and the scrutiny of the planning application and EIA process, and there is no
guarantee that the final road (as approved) will be as shown on the planning application for
the new hospital.  On the basis that the alignment of the road might vary slightly from what is
currently anticipated, then (depending on the extent and nature of the deviation) revised
plans would have to be submitted to the Planning Service for consideration.  A decision
would then be taken on whether a further planning application was required, could be
Page 67 of 74

Page 68

covered by an update to the approved plans under the proposed relevant condition, or if the
matter could be the basis of a “non-material variation”.  If the line of the new road was
significantly different from what is shown in this planning application, then clearly this could
raise significant question marks over the deliverability of the new hospital.  Such a scenario
would be flagged at an early stage through the joint working party meetings held between
NHS Lanarkshire and the Council. 
Access Opportunities– 
10.17 As noted earlier in the report, it has been concluded that the development complies with
sustainable transport policies as set out in NPF4 (policy 13) and the NLLDP (policy EDQ3). 
However, it is noted that whilst access to and from the wider area would be good (i.e. from
the EALR and the new bus services) access to the local area would be less satisfactory
(albeit, on balance, still considered to be acceptable).   
10.18 Whilst these shortcomings are noted, they are not sufficient to merit an objection from either
NLC Traffic & Transportation or from SPT and on balance they are also insufficient to merit a
recommendation that planning permission be refused.  It is clear that the EALR project (on
which the new hospital is dependant) will make a significant change to the wider built
environment as well as a significant change to the way that people travel in the area. Looking
at these changes, it is possible that there may be opportunities afforded by the EALR project
for enhancing accessibility to the new hospital.  These could take many forms but one option
(as outlined in the comments of NLC Traffic & Transportation -see para 7.2 above) might be
to create a new secondary vehicular access which may also allow for a relocated and more
appealing ATR.  The benefit of this approach could include improved accessibility to the local
area by sustainable modes (ie foot and cycle); it could help address the concerns of SPT
regarding ‘dead’ mileage for new bus services and it could provide the new hospital with a
more resilient secondary access in case of local road closures/incidents (albeit NHS
Lanarkshire are satisfied that the proposed resilience access currently meets their needs). 
10.19 In response to this suggestion, the applicant has confirmed that they are open to further
discussions on this matter but that it should not hinder determination of this current planning
application.  To be clear, this commitment to further negotiations would not be a requirement
of the planning permission.  It is important to note that this idea has no formal commitment at
present from the Council and that any decision to proceed on this basis (apart from requiring
co-operation from NHS Lanarkshire) would require further consultations and approvals. 
Junction Improvements at Forrest Street/Towers Road/Connor Street
10.20 As part of the Transportation Assessment, it has been demonstrated that the junctions of
Towers Road/Forrest Street/ Conner Street would be adversely impacted and would operate
over capacity without mitigation being in place.   As originally submitted as part of the
planning application, the applicant proposed various works at this location to address this
matter.  In summary, these works included the provision of 2 lanes of traffic (in both direction)
along Forrest Street on either side of the junction with Connor Street (immediately north of
Katherine Park).    To accommodate these works, the roadside parking and servicing spaces
in front of the retail units (west of Connor Street) were to be removed.  In response to this
scheme, the applicant was advised that this scheme was deficient on several fronts.  Most
notably, it was felt that the removal of the parking and servicing area would have an
unacceptable negative impact on the operation and viability of the commercial units.  Also,
NLC Traffic and Transportation had other concerns regarding the detailed design and layout
of the road improvements.   A revised sketch scheme has been submitted by the applicant
which sought to address the concerns mentioned above. However, it was clear that any
adequate scheme will likely necessitate road widening works which impinge into Katherine
Park (by a metre or so) which is likely to result in 16 or so mature beech trees being removed
along the north boundary of the park.  Following input from the applicant and NLC
Greenspace, it is noted that the trees, whilst currently providing a significant and positive
Page 68 of 74

Page 69

feature on a prominent location, are in poor condition and potentially dangerous.  The
applicant has stated that they are willing to accept a planning condition which requires the
submission of further details of proposed road geometry etc, but also details a significant
replacement planting scheme which would include 20 or so extra-large semi-mature trees. 
Whilst these works would undoubtedly result in a short-term adverse impact on the amenity
and appearance of the park and wider area, it is noted that the quality of the replacement
planting scheme would help mitigate the impact.  Furthermore, the scheme would clearly
help address an existing problem with the condition of the trees (noting that several other
similar trees have been taken down on the edge of the park in recent years).  There is also
no suggestion that the works would impact on the ability of the park to function (eg the
bowling green, children’s play park or paths and cycle paths). 
10.21 The applicant also notes that 8 of the 16 trees which would be removed contain potential bat
roost features.  Normally, it would be the case that a full bat survey should be carried out
before any decision was taken on the planning application.  In this instance, the applicant
has asked that this survey be the basis of a planning condition which required the survey
(and any necessary mitigation) to be carried out after planning permission is granted but
clearly before any tree removal takes place. The applicant is concerned that a delay in
determining the planning application would have significant and serious implications for the
programming of the project.  As outlined above, the applicant has also suggested that a
precautionary approach be taken ie it is being assumed that there are bats roosting in the
trees and this will help guide the additional assessment, protection and mitigation.  On
balance, and in this exceptional circumstance, the suggestion that the matter can be the
basis of a planning condition is accepted.  In coming to this view, other than accepting the
concerns regarding project programming, it is also noted that the preparatory works for the
tree removal will not take place for several years, and also the fact that as a stand-alone
project, if carried out by the council, the road widening works would not require planning
permission.   
Possible Pedestrian Connection to South Platform of Drumgelloch Station
10.22 In paragraph 8.3 above, it is noted that 6 letters of representation were submitted from
people living in and around Dunrobin Road and Sunnybank Drive (the latter forming part of
the recently completed Dawn Homes housing development).  In these representations, the
local residents objected to the possibility of a new pedestrian access point being created
between the south platform of Drumgelloch railway station and Sunnybank Drive.  By way of
explanation, it should be noted that the planning permissions for the new housing
development at Sunnybank Drive (including those dating back to 2004, before the
Airdrie/Bathgate rail connection was approved and built) required an area of land to be put
aside within the housing development to facilitate a possible future pedestrian connection to
the south of the railway station.  The house builder (Dawn Homes) created a footpath within
its own development site with the intention that this could allow for a future connection (by
others) to the railway station.  Clearly this connection has never been taken forward, and its
completion would require significant input from others including Network Rail.  In discussions
with NHS Lanarkshire regarding ways of improving accessibility between the new hospital
and local transport facilities, the applicant was asked to look into the possibility of completing
the aforementioned pedestrian link to the south of the railway station.  Sketch plans
submitted by the applicant suggest that this connection could (in theory) still be implemented. 
However, this option has not been progressed for a variety of reasons including: 
• It appears that there is third party land required (other than that controlled by NHS
Lanarkshire, the Council and Network Rail) which would act as a significant
constraint.
• The applicant has demonstrated that through other means, adequate access is
available to and from the new hospital site by public transport and active travel.
Page 69 of 74

Page 70

• Completion of this access link may impact adversely on road safety and amenity of
people living in and around Sunnybank Drive, as outlined in the 6 letters of objection
and supported by NLC Traffic & Transportation. 
10.23 Accordingly, in discussions with the applicant, it was agreed that the planning application for
the hospital should not include any proposals to complete this access link.  It remains
possible (with co-operation and resources from all interested parties) that this could be taken
forward as a separate project, but to be clear, there are no plans to act on this at present. 
Existing site
10.24 Discussions are on-going as to the future of the existing hospital site in Airdrie. A partnership
group has been set up by NHS Lanarkshire as a starting point for developing plans for the
future use of the existing hospital site in conjunction with relevant stakeholders.  This will be
taken forward as a separate project, independent of the proposals for the new hospital.  The
NLLDP identifies that site as being within the General Urban Area and therefore the potential
for alternative uses will be, broadly speaking, quite flexible.  Without knowing all of the
constraints associated with the redevelopment of the existing site, it is fair to say that its
development potential is good ie there is no obvious reason why the site should become
derelict if it were to be become vacated.   
Consultations
10.25 In reviewing responses from consultees, it is noted that Historic Environment Scotland, The
Health and Safety Executive and Scottish Power Energy Networks all have no objections to
the proposals.  In terms of comments from the Coal Authority, Scottish Water, Green Action
Trust, NLC Archaeology, Network Rail, Forestry and Land Scotland, NLC Protective Services
and SEPA, it is noted that they have no objections subject to matters which can adequately
be addressed by way of planning condition and or informative notes attached to the planning
permission.   
10.26 NLC Greenspace is supportive of the overall approach taken with regards to the works at
Katherine Park but has asked that full bat surveys be undertaken before a decision is taken
on the planning application. Details of why this requirement is considered to be suited to a
suspensive planning condition can be found in paragraph 10.2 above.   
10.27 NatureScot is broadly satisfied with the proposals and it is considered that the matters raised
in its response (including impact on ancient woodland and badger foraging) can be justified
and any residual impacts dealt with by way of planning condition.   
10.28 It is noted that NLC Traffic and Transportation and SPT are broadly supportive of the
proposals and most of the issues raised can be addressed by way of planning conditions. 
More generally, NLC Traffic and Transportation, SPT and Sustrans have all raised concerns
(to varying degrees) on matters regarding access and accessibility and in particular the
merits of the active travel route.  These points are addressed in paragraph 9.45 above.   
Page 70 of 74

Page 71

Representations
10.29 In response to the letters of representation: 
Impact on local road network in terms of convenience, disturbance and road safety
The Transportation assessment has demonstrated that traffic generated by the new
hospital development can be properly accommodated subject to provisos including
the construction of the EALR, off-site junction improvements and the implementation
of a Travel Plan.  During Construction works, new temporary access points and the
implementation of a Construction Environment Management Plan (CEMP) should
ensure that the construction works (and resultant traffic) can take place safely and
without undue disturbance on the environment.  All of this is supported by way of
comment from NLC Traffic & Transportation.     
Impact on local peace and quiet of area: 
It is accepted that the significant construction works (carried out over a prolonged
period) will be disruptive to the wider area, and that this disruption will be added to by
the fact that this will overlap with the two-year construction period for the EALR. 
However, the information submitted by the applicant (and accepted by NLC
Protective Services) confirms that impacts on local amenity will be within accepted
limits.  Implementation of suitable control measures during construction will be the
basis of a Construction Environment Management Plan (CEMP). Furthermore, once
the hospital is open, it has been accepted by NLC Protective Services that it can
operate without any undue impact on neighbouring properties in terms of noise.       
The new hospital is welcomed but not at the expense of the local environment. The
area is rich in wildlife and habitat.
There are many references to environmental impact throughout the applicant’s
submission and these are all addressed in this report.   
Adverse impact of development on the existing woodland and footpaths off Towers
Road.
Whilst there will be some impact on this woodland (owned and controlled by Forestry
Land Scotland) this will be mitigated by replacement planting and the overall treed
character of this part of the site will be maintained.  It is accepted that these works will
necessitate short term closure of some paths but these will be the basis of temporary
diversions. 
opportunities to build in good walking and cycling routes had been missed. 
The car park layout will create conflict between cars and pedestrians.
It is accepted that there is an opportunity for an additional path over the North Calder
Water, and indeed the applicant did propose (in early iterations of plans) the creation
of such a link.  However, that particular proposal was dropped due to issues with level
changes.  In terms of potential conflict between pedestrians and cars, the car park
layout incorporates suitable crossing points and speed control measures. 
Page 71 of 74

Page 72

10.30 In relation to the letter of objection from the Board of Managers of the St Philips School, it is
not accepted that the use of the temporary construction road will cause undue adverse
amenity, noise, and air quality, concerns for the school (or the proposed housing site) subject
to the mitigations required as part of the proposed CEMP.  Accordingly, there is no need for
the Council or the applicant to pursue the mitigations suggested by the school board.  Since
receipt of the letter of representation, the applicant has been in discussions with
representatives of the School Board to see if further clarity and reasonable changes could be
made to the construction programme in the hope that the concerns could be addressed and
if possible withdrawn. This culminated in a letter from the applicant to the school board in
February 2024 which is summarised as follows: 
• For clarity, the proposed 3m hoarding would be alongside the temporary access road and
not in close proximity to the school.   
• The submitted Noise Impact Assessment confirms that relevant construction noise
criteria are met.   
• Similarly, the Air Quality Assessment (along with suitable mitigation by way of the CEMP)
should ensure that surrounding land uses and occupiers are not unduly impacted. 
• There is no justification for the widening of Brownieside Road/Stanrigg Street in order to
accommodate construction traffic and there would be no benefit to the hospital project in
using the proposed housing site as a temporary construction compound. The applicant
does not accept that there would be detrimental impact on the proposed housing site. 
11 Conclusions 
11.1 It is accepted that there is a pressing need for a new hospital facility within the catchment
area of the existing Monklands Hospital.  In order to find an appropriate replacement facility,
NHS Lanarkshire prepared appropriate site selection criteria and unsurprisingly (given the
requirements in terms of location and scale) there are very few sites in the area that could
accommodate a new hospital complex of this size.  None of the 3 sites in the final short list
are appropriately zoned in the NLLDP and the site at Wester Moffat scored highest, based
partly on its location next to the proposed East Airdrie Link Road, but also on the back of a
popular vote.   
11.2 With limited options coming through in the site selection process, it is clear that certain trade-
offs have had to be made.  The site is zoned as Green Belt in the North Lanarkshire Local
Development Plan and the development will result in the loss of some ancient woodland. 
When weighed against all development plan policies (including many which weigh in its
favour) it has been concluded to be a significant departure.  Accordingly, this planning
application should be refused permission unless there are material considerations which
(when weighed together) merit the overturning of the terms of the development plan. 
11.3 Although located in the Green Belt, it has been demonstrated that the new development will
be largely well contained within the surrounding area and should not have a significant
adverse impact on the character of the Green Belt at this location or on the setting of the
east side of Airdrie, particularly when it is seen in the context of the proposed EALR.   
Page 72 of 74

Page 73

11.4 The proposed development will not only replace a facility that is facing many challenges in
terms of condition and layout, but it will also incorporate new clinical processes all of which
will result in a significant improvement in health care provision for a great many people.   This
weighs heavily in favour of granting planning permission.  In addition, there will be a degree
of positive economic benefit from the construction operations and the introduction of around
146 new jobs to the area plus the equivalent of 1574.8 construction jobs during the 6-year
construction period.   
11.5 In terms of environmental impact, the development incorporates the necessary bio-diversity
net gain that is now required by NPF4.  Clearly the loss of some ancient woodland is
regrettable and is one of the reasons that the application is deemed to be a significant
departure from the development plan.  However, this is outweighed in cases where social,
economic and environmental considerations weigh in favour of the development, and it is
concluded that this is the case here.   
11.6 In terms of vehicular access, the dependency on the East Airdrie Link Road project is
somewhat of a double-edged sword.  Whilst it will certainly have great benefits in terms of
connecting the site by road to a wide area, there are potential risks associated with this
approach should the road project be delayed or not go ahead.  NHS Lanarkshire is aware of
these risks.  However, the EALR project is a cornerstone in the Council’s City Deal
programme and the Council remains committed to seeing the project through to completion.   
11.7 Looking at more sustainable means of accessing the site, the enhanced public bus service
agreement should ensure that the site enjoys levels of accessibility by bus which are as good
as (or possibly better than) those enjoyed at the existing hospital site.  The Active Travel
Route has been the basis of concern from some consultees but subject to detailed design
(including lighting and CCTV) should provide acceptable access to the site by foot,
wheelchair or cycle. 
11.8 Responses from consultees and the local community (by way of representations) are
material considerations.  It is noted that 7 letters of representation were received and it is
considered that the comments of the local community and consultees have all been
adequately addressed or responded to.   
11.9 Weighing up all the pros and cons of the proposals, it is noted that this development is a
significant departure from the development plan.  However, bearing in mind the pressing
need for the development, the significant benefits in terms of improved health care facilities
for a significant number of people, the fact that very few options exist for locating the
development and the range and nature of measures to mitigate adverse impacts, it must be
concluded that the benefits far outweigh the disbenefits.  On this basis it is recommended
that planning permission be granted subject to conditions.   