Notice is given that a Meeting of the Council is to be held in the Council Chamber, Civic
Centre, Windmillhill Street, Motherwell, ML1 1AB on Thursday, 02 May 2024 at 16:00 PM
which you are requested to attend. 
The agenda of business is attached. 
Des Murray
Chief Executive 
Members : 
Clerk Name: Mark Hamill
Clerk Telephone: 07811294702
Clerk Email: hamillm@northlan.gov.uk 
D Ashraf, A Ballinger, C Barclay, B Baudo, A Beveridge, M Boyd, H Brannan-McVey, G
Brennan, B Burgess, A Bustard, J Cairns, A Campbell, T Carragher, C Costello, M Coyle, S
Coyle, D Crichton, G Currie, P Di Mascio, K Docherty, K Duffy, A Duffy-Lawson, H Dunbar,
T Fisher, F Fotheringham, W Goldie, K Harmon, M Hughes, J Hume, L Jarvie, D Johnston,
T Johnston, J Jones, P Kelly, J Keltie, A Khan, K Larson, J Leckie, G Lennon, J Logue, H
Loughran, F MacGregor, A Masterton, M McBride, B McCluskey, A McCrory, B McCulloch,
M McCulloch, P McDade, F McKay, R McKendrick, J McLaren, C McManus, F McNally, M
McPake, J McPhilemy, A McVey, L Mitchell, L Nolan, P Patton, J Reddin, L Roarty, D Robb,
G Robinson, N Shevlin, W Shields, A Smith, K Stevenson, A Stubbs, L Stubbs, R Sullivan,
A Thomas, J Toner, S Watson, C Williams, N Wilson, G Woods.  
Page 1 of 86

Page 2

Page 2 of 86

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical Standards
In Public Life Etc. (Scotland) Act 2000   
2 Membership of Committees, Sub-Committees, Panels,
Working Group and Outside Bodies   
3 The Enterprise Strategic Vehicle – Housing and
Corporate Maintenance and Improvement Services
Contract – Project Timeline
Submit report by the Chief Officer (Assets and Procurement)
providing a high level summary of the key project activity,
including a synopsis of the previous reports provided to
elected members and audit reports as they relate to the
Housing and Corporate Maintenance and Improvement
Contract element of the Enterprise Project. 
5 - 34  
EXCLUSION OF PUBLIC
The Council is asked to consider passing the following
resolution: "That under Section 50A(4) of the Local
Government (Scotland) Act 1973, the public be excluded from
the meeting for agenda item 4 only on the grounds that it
involves the likely disclosure of exempt information as defined
in paragraph 9 of Part 1 of Schedule 7A of the Act". 
4 Updated Risk Analysis – Housing and Corporate
Maintenance and Improvement Services Contract
Submit Joint report by the Depute Chief Executive and Chief
Officer (Finance) advising of the risks presented by not
awarding the new Enterprise Strategic Vehicle – Housing and
Corporate Maintenance and Improvement Services Contract. 
5 The Enterprise Strategic Vehicle – Housing and
Corporate Maintenance and Improvement Services
Contract – Contract Award
Submit joint report by the Chief Officer (Assets and
Procurement), Chief Officer (Housing Property Services) and
Chief Officer (Housing Management) seeking approval to
award the contract for the future delivery of Housing and
Corporate Maintenance and Improvement Services to Mears
Limited following the completion of a procurement exercise
undertaken in accordance with the Public Contracts
(Scotland) Regulations 2015 and the Council’s General
Contract Standing Orders 
35 - 86 
Page 3 of 86

Page 4

Page 4 of 86

Page 5

North Lanarkshire Council    
Report
Council 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    JMcK/GP Date 02/05/24 
The Enterprise Strategic Vehicle – Housing and Corporate
Maintenance and Improvement Services Contract – Project
Timeline 
From  James McKinstry Chief Officer (Assets and Procurement)  
E-mail mckinstryj@northlan.gov.uk   Telephone 07939281102 
1. Background 
Members will recall a series of reports to the Policy and Strategy Committee and the
Council regarding the Enterprise Strategic Vehicle, updating on the progress and
development of the Enterprise Project and in its previous form, the Enterprise Strategic
Commercial Partnership.
At the meeting of the Council on 28 March 2024, it was decided that a report be
provide to the next meeting of the Council providing a synopsis of these reports, the
project timeline and a summary of key activity as they relate to the Housing and
Corporate Maintenance and Improvement Contract element of the Enterprise Project. 
Executive Summary
The purpose of this report is to provide the Council with a high level summary of key
project activity, including a synopsis of the previous reports provided to elected members
and audit reports as they relate to the Housing and Corporate Maintenance and
Improvement Contract element of the Enterprise Project. 
Recommendations 
It is recommended that the Council note the content of the report. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (24) Review and design services around people, communities, and
shared resources
Item 3
Page 5 of 86

Page 6

2. Report 
2.1 Initial planning and development of the Enterprise Strategic Vehicle concept
commenced in late 2018. Since 2018, elected members have received a number of
reports in relation to the Enterprise Project and in its previous form, the Enterprise
Strategic Commercial Partnership. These reports included related project planning and
development activity, sought approval for key project decisions, notified the outcomes
of the various stages of the procurement exercise and provided general progress
updates. 
2.2 Internal audit has reported on the Enterprise Project, or its previous incarnation, on
four separate occasions, the latest report being February 2024. 
2.3 A synopsis of the previous reports provided to elected members, along with a
summary of key activity and audit reports as they relate to the Housing and Corporate
Maintenance and Improvement Contract element of the Enterprise Project is provided
in Table 1. 
Table 1
Ref Date Activity
1. Dec 2018 –
Feb 2019
Initial planning/development of Enterprise Strategic Vehicle
concept.
2. 28 Feb
2019
Report to the Policy and Strategy Committee 
• initial planning undertaken to support the development of
an Enterprise Contract; 
• initial stages of the procurement of an Enterprise Contract
for North Lanarkshire, including the consideration of
potential delivery vehicle options; 
• procurement of appropriate specialist advice to support the
procurement exercise; and
• a Prior Information Notice to be published to notify the
market of the Council's intention to procure a new delivery
vehicle for a range of interconnected property, community
asset and infrastructure investments.
3. 26 Sept
2019
Report to the Policy and Strategy Committee
• scope agreed for the Enterprise Strategic Commercial
Partnership for the purposes of developing the final Outline
Business Case; 
• final Outline Business Case, including the final
recommended approach for the main procurement, will be
provided a future meeting of the Committee for
consideration; and
• existing contracts be kept under review, with the option of
implementing extensions until the Enterprise Partnership
fully in place.
4. Nov 2019 Pre Procurement - Prior Information Notice published -
Enterprise Strategic Commercial Partnership.
5. Dec 2019 –
Jan 2020
Pre Procurement - Market Engagement, test proposed
Enterprise Strategic Commercial Partnership model and
approach with the market.
Page 6 of 86

Page 7

6. Mar 2020 Internal Audit Report
• Internal Audit report – ‘’adequacy and effectiveness of the
council’s governance arrangements in respect of the
Enterprise Strategic Commercial Partnership’’ 
o the audit provided a ‘’reasonable assurance’’
opinion;
o Audit recommendations arising – clarity on future
governance arrangements; and
o The audit recommendations accepted by
management.
7. 19 Mar
2020
Report to the Policy and Strategy Committee, 
• outcomes of the Outline Business Case for the Enterprise
Strategic Commercial Partnership project; 
• project scope; 
• preferred model - full Strategic Single Joint Venture
Partnership for no less than a 20 year concession period; 
• definitive Preferred Model and partnership concession
duration would be developed and finalised through the
procurement process;
• the procurement procedure, likely to involve competitive
dialogue; 
• commercial and procurement aspects of the project could
only be dealt with as high level principles at the Outline
Business Case stage and would be developed as part of
the procurement stage, with finalisation of some areas at
preferred bidder stage; and
• high level indicative timeline for procurement and transition
arrangements of the new partnership.
8. Mar 2021 Internal Audit Report
• Internal Audit report – ‘’adequacy and effectiveness of the
council’s governance arrangements in respect of the
Enterprise Strategic Commercial Partnership’’
o the audit provided a ‘’reasonable assurance’’
opinion;
o audit recommendations arising – a more formal
approach to the management of project risk
registers; and
o the audit recommendations accepted by
management.
9. Apr 2021 Procurement - Contract Notice Published – Enterprise
Strategic Commercial Partnership – formal launch of the
procurement.
10. Jun 2021 Procurement - Selection Stage submission deadline – despite
positive market engagement - insufficient market response to
the Enterprise Strategic Commercial Partnership opportunity.
11. Jun 2021  Market Engagement – feedback sought from the market as to
why non-participation in the Enterprise Strategic Commercial
Partnership opportunity.
12. Jul 2021 –
Sep 2021
Development of the revised delivery model.
13. Sep 2021 Project Board approve the principles of the revised delivery
model.
14. Oct 2021 –
Mar 2022
Pre Procurement - Market Engagement, test revised delivery
model and proposed approach with the market.
Page 7 of 86

Page 8

15. 2 Dec 2021 Report to the Policy and Strategy Committee, 
• despite positive market engagement - insufficient market
response to the Enterprise Strategic Commercial
Partnership opportunity;
• discontinuation of the Enterprise Strategic Commercial
Partnership procurement, project renamed as the
Enterprise Project;
• revised delivery model incorporating a hybrid approach,
small number of strategic ‘best in class’ service providers;
• not a Joint Venture;
• shorter contract period than the 20 years previously
envisaged;
• separate contracts for Housing and Corporate, Roads and
Infrastructure and Place shaping (the phase 1
procurements);
• the commencement of the Phase 1 procurements; 
• development of intelligent client function;
• market indicates appetite for council’s proposals; and
• limited market.
16. May 2022 Internal Audit Report
• Internal Audit report – ‘’adequacy and effectiveness of the
council’s governance arrangements in respect of the
Enterprise Project’’;
o the audit provided a ‘’reasonable assurance’’
opinion;
o audit recommendations arising – formal
contingency plans be developed; and
o the audit recommendations accepted by
management.
17. Jun 2022 Project Board approve updated Outline Business Case –
Enterprise Project.
18. Jun 2022 Procurement - Contract Notice Published – Housing and
Corporate Contract - formal launch of the procurement
19. Aug 2022 Procurement - Selection Stage submission deadline – despite
positive market engagement, single selection stage response
received.
20. Sep 2022 Procurement - Selection Stage submission assessment
complete – bidder satisfies the selection criteria
21. Sep 2022 Project Board:
• the procurement should progress with one bidder, with
appropriate risk mitigation, to the stage in the procurement
process where the initial tender submission has been
received and reviewed; and 
• in parallel, given the significant change in financial and
economic circumstances since service delivery options
were originally appraised, the council should re-validate the
other available service delivery options. 
22. 1 Dec 2022 Report to the Policy and Strategy Committee - Press and
Public Excluded
• update on status of the procurement;
• despite positive market engagement – only one request
received to participate in the procurement;
Page 8 of 86

Page 9

• the procurement should progress with one bidder, with
appropriate risk mitigation, to the stage in the procurement
process where the initial tender submission has been
received and reviewed; 
• in parallel, given the significant change in financial and
economic circumstances since service delivery options
were originally appraised, the council should re-validate the
other available service delivery options; and
• that a further report be provided to the Committee in May
2023 reporting on the progress of the procurement and the
outcome of the options revalidation exercise for the
Housing and Corporate Contract and the progress of the
Roads Contract.
23. Dec 2022 –
Feb 2023
Options Revalidation Exercise – procurement of an external
independent organisation to undertake the exercise.
24.  Feb 2023 Grant Thornton appointed to undertake Options Revalidation
Exercise.
25. Mar 2023 Procurement - Invitation to submit an Initial Tender issued to
the sole Bidder.
26. May 2023 Procurement - Initial Tender submission received from the sole
Bidder.
27. Aug 2023 Procurement - Evaluation of Initial Tender submission
complete.
28. 17 Aug
2023
Report to Council - Press and Public Excluded
• the outcome of the Options Revalidation Exercise, along
with consideration of risks, confirms that continuing with the
current procurement exercise would best meet the
council’s objectives;
• outcome of the assessment of the Initial Tender
submission and related implications;
• that the current procurement will proceed to a conclusion;
• that improvements to the initial tender submission could be
reasonably expected as the procurement progressed to
award stage;
• that subject to the bidder meeting the councils’
requirements in full, a contract award recommendation be
provided to a future meeting of the Council;  
• that, before the end of the initial term of the proposed
contract, consideration will be given to the development of
an outline business case which will investigate the
feasibility of alternate service delivery models, including the
feasibility of an ALEO, which would inform decision-making
about any extension to the proposed contract; and
• agreement to extend the contract beyond its January 2024
expiry date. 
29. Sep – Oct
2023
Procurement - Negotiation stage.
30. Oct 2023 Procurement - Invitation to submit a Final Tender issued to the
sole Bidder.
31. Nov 2023 Procurement - Final Tender submission received from the sole
Bidder.
32. 7 Dec 2023 Report to the Policy and Strategy Committee
Page 9 of 86

Page 10

• Positive progress with the procurement and timeline to
completion. 
33. Jan 2024 Contract expiry date – contract subsequently extended to 30
June 2024.
34. Feb 2024 Internal Audit Report
• Internal Audit report – ‘’project managed in accordance
with corporate expectations and good practice/ risk
mitigation and evidencing best value in the single bidder
scenario’’;
o audit outcome - satisfied that the project has been
managed in line with corporate expectations and
that the management assessment of best value
was undertaken in line with the intended approach;
o audit recommendations arising – strengthen
contract management activity in relation to the
proposed contract;
o audit recommendations accepted by management. 
35. Mar 2024 Procurement - Evaluation of Final Tender submission complete
36. 28 Mar
2024
Report to the Council
• Internal Audit report – ‘’project managed in accordance
with corporate expectations and good practice/ risk
mitigation and evidencing best value in the single bidder
scenario’’;
o audit outcome - satisfied that the project has been
managed in line with corporate expectations and
that the management assessment of best value
was undertaken in line with the intended approach;
o audit recommendations arising – strengthen
contract management activity in relation to the
proposed contract;
o audit recommendations accepted by management. 
• Contract Award Recommendation Report (report
subsequently withdrawn)
37. 2 May 2024 Report to the Council 
At time of writing, agenda not yet published. 
38. 30 Jun 2024 Contract extension expires.
39. 1 Jul 2024 Commencement of proposed contract. 
2.4 For convenience the minutes of the meetings of the Policy and Strategy Committee
and the Council referenced in Table 1 are provided as Appendices 1 – 8. 
2.5 Members are also aware that a Project Board comprising a number of Chief Officers
and external advisors is in place providing an essential project governance role. 
2.6 The Project Board meets regularly to oversee all aspects of the Enterprise Project,
the Project Board has met on 66 occasions since the projects inception in 2018. 
Page 10 of 86

Page 11

2.7 The report is intended to provide members with a helpful aide memoire of key project
activity, governance and audit reports over the life of the project.
3. Measures of success 
3.1 The measures of success remain as previously reported to the Committee on 19
March 2020, the Enterprise Project will help the council to: 
• shape North Lanarkshire;
• enhance our economy;
• regenerate our communities;
• provide cohesive maintenance and repairs;
• focus on whole-life investment;
• achieve more efficient and effective delivery;
• move towards more sustainable and carbon neutral communities; and
• provide access to additional resources. 
3.2 The delivery model will continue to support twenty of the twenty five ambition
statements, being a key driver for nine of these ambition statements (2, 3, 5, 6, 17,
21, 22, 24, 25) and contributing to eleven other ambition statements (1, 4, 10, 11, 12,
14, 15, 16, 18, 19, 23) and will be a catalyst for the successful delivery of the Plan for
North Lanarkshire and its key priorities. 
4. Supporting documentation 
Appendix 1 - Report to the Policy and Strategy Committee, 28 Feb 2019 
Appendix 2 - Report to the Policy and Strategy Committee, 26 Sept 2019
Appendix 3 - Report to the Policy and Strategy Committee, 19 March 2020
Appendix 4 - Report to the Policy and Strategy Committee, 2 December 2021
Appendix 5 - Report to the Policy and Strategy Committee, 1 December 2022
Appendix 6 - Report to the Council, 17 August 2023
Appendix 7 - Report to the Policy and Strategy Committee, 7 December 2023
Appendix 8 - Report to the Council, 28 March 2024 
James McKinstry
Chief Officer – Assets and Procurement 
Page 11 of 86

Page 12

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The Enterprise Project aims to create, through the council’s strategic contractual 
relationships with service providers, social value at scale for local communities. This
will help the council to meet the requirements of the Fairer Scotland Duty to reduce 
socio disadvantage. 
Socio economic impact is at the heart of the Enterprise Project and related contracts.
The Enterprise Project will deliver a range of socio-economic benefits for the local
community at a scale that cannot be achieved from current procurement and contract
management practices. Targeted social value benefits will include; 
• Employment Education & Skills - generate employment and training
opportunities for school leavers, apprentices and unemployed people;
• Supply Chain Development & Opportunities - use small and medium sized
enterprises (preferably local). Social enterprise or a supported business in supply
chain;
• Community Engagement & Capacity Building – to benefit local communities;
• Environment - implement cardon reduction and sustainability initiatives; and
• Innovation - introduce innovation in delivery of services (e.g., digital tools,
automation, working practices).
A single co-ordinated framework for delivering, measuring, and reporting socio
economic impact across all Enterprise Project related contracts will be developed
and implemented, this framework will be scalable for use across the wider
organisation.  
The council incorporates the statutory guidance on addressing ‘Fair Work Practices’
including payment of the Living Wage in all significant procurements. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Finance has been engaged with the Enterprise Project since its inception and is
represented on the Project Board and the supporting professional advisors group. 
Page 12 of 86

Page 13

The financial implications are set out in the Enterprise Strategic vehicle – Housing
and Corporate Maintenance and Improvement Services Contract – Contract Award
report elsewhere on this agenda. 
Contract expenditure will be managed from current General Fund and Housing
Revenue Account budgets for repairs, maintenance and, where relevant, capital
expenditure. Future costs will be incorporated into medium term financial planning
processes considering contract inflation and thereafter considered as part of the
Council’s normal budget setting processes.   
Given the potential scale, complexity and importance of this project in helping to
realise the ambitions for North Lanarkshire, the Policy and Strategy Committee
meeting in February 2019 agreed that to supplement inhouse capacity and
capability, the procurement of appropriate specialist advice to support the
procurement exercise be authorised. 
External advisors’ fees, for all aspects of Enterprise Project (including the linked
predecessor project, the Enterprise Strategic Commercial Partnership) total
£4.284m (as of April 2024). The external advisors’ fees equate to 0.20% of the
combined total upper estimated contract value of the two phase one Enterprise
Project procurements. Professional advisors’ fees typically equate to around 10%
of the total cost of a project. 
Advisors’ fees paid remain within estimates, fees have been incurred in
accordance with internal procedures including committee approval/noting of
contract awards. 
External advisors are managed by the Project Team, with regular reports provided
to the Project Board. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
People Resources has been engaged with the Enterprise Project since its inception
to ensure any and all HR considerations are addressed. 
HR is represented on the Project Board and the supporting professional advisors’
group. 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Page 13 of 86

Page 14

The Legal and Democratic service has been fully involved with the Enterprise
Project since its inception and has sought advice from external legal advisors to
ensure the council manages legal risks effectively. 
Legal and Democratic is represented on the Project Board and the supporting
professional advisors’ group. 
Legal advice has been and will continue to be sought to ensure compliance with
applicable legislation and to ensure the council manages legal risks effectively.
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☒
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The project includes securing efficiencies through further digitising aspects of
information exchange and ways of working. 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☒ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Enterprise Project aims to develop an innovative new approach to delivery for
a full range of interconnected property, community asset and infrastructure
investments. As such, will help the council to create more attractive town centres,
address areas of poor quality in the built environment, and encourage town centre
living through greening and improved community assets. Added to this, the
reshaping of North Lanarkshire’s town centres will aim to incorporate more energy
efficient housing and infrastructure and promote active travel and the use of public
transport via the development of transport hubs / interchanges, to support future
council targets for net zero emissions. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐
Page 14 of 86

Page 15

If Yes, please provide a brief summary of the impact? 
Regular updates relating to the Enterprise Project have been provided in line with
the agreed project communication plan, this will continue as the project progresses,
through contract award, contract mobilisation and ongoing contract management
phases. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Associated risks for the Enterprise Project are identified and managed in
accordance with the agreed corporate project risk management methodology and
monitored and reported via the Project Team and/or Project Board with risk
escalation as required. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
The Bidders have made a commitment to diversifying its workforce through
initiatives such as “Tradeswomen into Maintenance”, and the “Armed Forces
Covenant”;
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒ 
Page 15 of 86

Page 16

Appendix 1 - Report to the Policy and Strategy Committee, 28 Feb 2019
PRESENT 
Councillor Logue, Convener; Councillor Kelly, Vice−Convener; Councillor Roarty,
Vice−Convener; Councillors Beveridge, Burrows, Carragher, Duffy, Fotheringham, Gallacher,
Graham, Hume, T. Johnston, Larson, Linden, McNally, McPake, H. McVey, Morgan, Alan
Valentine and Watson. 
ALSO PRESENT 
In accordance with Standing Order 64(A), Councillors Barclay, Kerr, Magowan and
McCulloch attended as substitutes for Councillors Stocks, Goldie, Stubbs and Castles
respectively. 
CHAIR 
Councillor Logue (Convener) presided. 
IN ATTENDANCE 
The Chief Executive; Executive Director (Enterprise and Communities); Interim Chief
Accountable Officer: Head of Legal and Democratic Solutions; Head of Financial Solutions;
Head of Asset and Procurement Solutions; Head of Business Solutions; Head of
Communication and Strategy; Head of Communities; Head of Education (Central); Head of
Business (Housing Property and Projects); Head of Regulatory Services and Waste
Solutions; Business Solutions Manager; Audit and Risk Manager; Business Finance
Manager; Legal Manager: Property Manager (Assets and Estates), and Democratic Services
Manager. 
APOLOGIES 
Councillors Burgess, Castles, Goldie, Stocks and Stubbs. 
There was submitted a joint report by the Head of Asset and Procurement Solutions and the
Head of Business (Housing Property and Projects) 
(1) intimating that through WE Aspire, the Council had articulated an ambitious vision for
change which would revitalise communities and accelerate the growth in economic
output for the whole of North Lanarkshire; 
(2) advising that to support this ambitious vision the Council would invest in excess of £2
billion in improved infrastructure, facilities and services over the next ten years; 
(3) stating that it was important that the necessary delivery mechanisms be put in place
to ensure that the Council could move at pace and meet the demands of its
communities; 
(4) proposing that a strategic partnership be established which could provide the capacity
to assist with the delivery of the Council's ambitions over the next ten years, from
initial feasibility, through design to delivery and construction, and then to lifecycle
maintenance and management; 
(5) seeking authorisation to scope and explore options for an innovative new approach to
delivery for a full range of interconnected property, community asset and
infrastructure investments to ensure that the Council delivers on its shared ambition
Page 16 of 86

Page 17

for inclusive growth and prosperity for the people and communities of North
Lanarkshire; 
(6) indicating that this would potentially include the repair of and investment in current
and new build housing, and Council assets, as well as delivery of new community
assets, infrastructure and town centre regeneration programmes; 
(7) informing that, given the potential scale and importance of this project in realising the
ambitions for North Lanarkshire, there was a need to procure specialist advice and
support; 
(8) recommending that a Prior Information Notice be published in the Official Journal of
the European Union to notify the market of the Council's intention to procure a new
delivery vehicle for a full range of interconnected property, community asset and
infrastructure investments, and 
(9) advising the Committee that reports would be submitted to future meetings of the
Committee as the procurement progressed. 
Decided: 
(1) that it be noted that initial planning had been undertaken to support the development
of an Enterprise Contract; 
(2) that the initial stages of the procurement of an Enterprise Contract for North
Lanarkshire, including the consideration of potential delivery vehicle options, be
approved; 
(3) that the procurement of appropriate specialist advice to support the procurement
exercise be authorised; 
(4) that a Prior Information Notice be published in the Official Journal of the European
Union to notify the market of the Council's intention to procure a new delivery vehicle
for a range of interconnected property, community asset and infrastructure
investments, and 
(5) that it be noted that reports would be submitted to future meetings of the Committee
as the procurement progresses 
Link to meeting agenda, minute and supporting reports: CMIS > Meetings 
Page 17 of 86

Page 18

Appendix 2 - Report to the Policy and Strategy Committee, 26 Sept 2019
PRESENT 
Councillor Logue, Convener; Councillor Kelly, Vice-Convener; Councillor Roarty, Vice-
Convener; Councillors Barclay, Burgess, Burrows, Castles, Di Mascio, Duffy, Fotheringham,
Gallacher, Graham, Hume, T. Johnston, Linden, McNally, McPake, H. McVey, Morgan and
Watson. 
ALSO PRESENT 
In accordance with Standing Order 64(A), Councillor Kerr attended as a substitute for
Councillor Alan Valentine. 
CHAIR 
Councillor Logue (Convener) presided. 
IN ATTENDANCE 
The Chief Executive; Executive Director (Education and Families); Chief Accountable Officer;
Head of Legal and Democratic Solutions; Head of Financial Solutions; Head of Business
Solutions; Head of Asset and Procurement Solutions; Head of Communities; Head of
Children, Families and Justice Social Work Services; Head of People and Organisational
Development; Head of Strategic Communication; Audit and Risk Manager; Commercial
Contract Manager; Democratic Services Manager, and Senior Manager, NHS Lanarkshire. 
APOLOGIES 
Councillors D. Ashraf, Goldie, Magowan and Alan Valentine 
With reference to paragraph 4 of the Minute of the Special meeting of this Committee held on
28 February 2019, there was submitted a report by the Head of Asset and Procurement
Solutions 
(1)  providing an update on the development stage activities to explore the scope for a
new delivery approach through a strategic commercial partnership for the Enterprise
Project, and 
(2)  seeking approval on the principles of the scope identified to permit continuation to the
final Outline Business Case stage. 
Decided: 
(1)  that the principles of the service’s activities, as detailed in Appendix 1 to the report,
be taken forward as the scope for the Enterprise Strategic Commercial Partnership
for the purposes of developing the final Outline Business Case; 
(2)  that it be noted that all activity necessary to progress the project to final Outline
Business Case would be based on the scope, as detailed in Appendix 1 to the report; 
(3)  that it be noted that the final Outline Business Case, which would include the final
recommended approach for the main procurement, would be submitted to a future
meeting of the Committee for consideration, and (4) that it be noted that all existing
Page 18 of 86

Page 19

contracts would be kept under review, with the option of implementing extensions
until the Enterprise Partnership was fully in place. 
Link to meeting agenda, minute and supporting reports: CMIS > Meetings 
Page 19 of 86

Page 20

Appendix 3 - Report to the Policy and Strategy Committee, 19 March 2020
PRESENT 
Councillor Logue, Convener; Councillor Kelly, Vice-Convener; Councillor Roarty, Vice-
Convener; Councillors Barclay, Beveridge, Burrows, Castles, Di Mascio, Duffy, Gallacher,
Goldie, T. Johnston, Lennon, Magowan, McNally, McPake, Morgan, Alan Valentine and
Watson
ALSO PRESENT 
In accordance with Standing Order 64(A), Councillors Jones, Kerr, Larson, and McCulloch
attended as substitutes for Councillors Brannan-McVey, D Ashraf, Linden, and Graham
respectively.
CHAIR 
Councillor Logue (Convener) presided.
IN ATTENDANCE 
The Chief Executive; Executive Director (Education and Families); Executive Director
(Enterprise and Communities); Chief Accountable Officer, Health and Social Care; Head of
Legal and Democratic Solutions; Head of Financial Solutions; Head of Asset and
Procurement Solutions; Head of Business Solutions; Head of Communication and Strategy;
Head of Communities; Head of Education (North); Head of Environmental Assets; Head of
People and Organisational Development; Head of Planning and Regeneration; Assurance
and Development Manager; Audit and Risk Manager; Business Solutions Manager;
Enterprise Manager; Group Manager (Assets Management), and Democratic Services
Manager
APOLOGIES 
Councillors D Ashraf, Brannan-McVey, Graham, Hume, Linden and Wilson. 
With reference to paragraph 15 of the Minute of the Special meeting of this Committee held
on 28 February 2019, when it had 
(1)  approved the initial stages of the procurement of an Enterprise Contract for North
Lanarkshire, including the consideration of potential delivery vehicle options; 
(2)  authorised 
(a) the procurement of appropriate specialist advice to support the procurement
exercise, and 
(b) the publication of a Prior Information Notice in the Official Journal of the European
Union to notify the market of the Council’s intention to procure a new delivery vehicle
for a range of interconnected property, community asset and infrastructure
investments, and 
(3)  noted the financial and human resources implications, there was submitted a report
by the Head of Asset and Procurement Solutions 
(a) providing details therein of the high level outcomes from the Outline Business
Case (OBC) for the Enterprise Strategic Commercial Partnership, and 
Page 20 of 86

Page 21

(b) seeking approval to proceed to the next phase of the project, that being the
Procurement of the Preferred Model.
Decided: 
(1) that the completion and the outcomes of the OBC for the Enterprise Strategic
Commercial Partnership project be noted;
(2) that the development of the scope outcome recommendations, as outlined in
Appendix 1 to the report, be noted;
(3) that it be noted that the OBC Preferred Model, based upon the scope outcome, was
for a Full Strategic Single Joint Venture Partnership for no less than a 20 year
concession period, but that the definitive Preferred Model and partnership concession
duration would be developed and finalised through the procurement process;
(4) that it be noted 
(a) that, to meet the ambitions of the Enterprise project to best benefit North
Lanarkshire, the innovative parts of the solution would be shaped from industry
dialogue as part of the procurement, and 
(b) that, consequently, the procurement procedure, subject to undertaking the
Sourcing Methodology, would be likely to involve competitive dialogue;
(5) that it be noted that the commercial and procurement aspects of the project could only
be dealt with as high level principles at the OBC stage and would be developed as
part of the procurement stage, with finalisation of some areas at preferred bidder
stage;
(6) that it be noted that although a high level indicative timeline for procurement and
transition arrangements of the new partnership had been provided, the project
programme would be developed after OBC approval to align to the approved project
and the selected procurement procedure, which would be likely to be a lengthy and
complex process;
(7) that it be noted 
(a) that there was a plan in place for the level of funding available to correspond to
the service delivery areas in scope for the Enterprise Strategic Commercial
Partnership, and 
(b) that estimates would be subject to annual review, and that a key objective of the
partnership was to manage expenditure within available resources to ensure that the
partnership was both flexible and scalable to the availability of finance, and
(8) that progression of the Enterprise project to the procurement stage, based upon the
principles outlined in the text at (3), (4), (5) and (7) above, be approved 
Link to meeting agenda, minute and supporting reports: CMIS > Meetings 
Page 21 of 86

Page 22

Appendix 4 - Report to the Policy and Strategy Committee, 2 December 2021
PRESENT 
Councillor Logue, Convener; Councillor Paul Kelly, Vice-Convener; Councillors Barclay,
Beveridge, BrannanMcVey, Burrows, Douglas, Duffy, Fannan, Fisher, Fotheringham,
Gallacher, Graham, Hume, Kerr, Linden, McNally, McPake, Alan Valentine and Watson.
ALSO PRESENT 
In accordance with Standing Order 64(A) Councillors McCulloch and T. Johnston substituted
for Councillors Roarty and C. Johnston respectively.
CHAIR 
Councillor Logue (Convener) presided.
IN ATTENDANCE 
The Chief Executive, Executive Director (Enterprise and Communities), Executive Director
(Education and Families), Chief Officer, Health and Social Care, Head of Financial Solutions,
Head of People and Organisational Development, Head of Legal and Democratic Solutions,
Head of Business Solutions, Head of Asset and Procurement Solutions, Head of Education
(Central), Head of Strategic Communications, Head of Children, Families and Justice
Services/Chief Social Work Officer, Head of Environmental Assets, Head of Communities,
Head of Regulatory Services and Waste Solutions, Audit and Risk Manager, Employee
Service Centre Manager, and Democratic Services Manager.
APOLOGIES 
Councillor Roarty, Vice-Convener; Councillors D. Ashraf, Goldie, C. Johnston and Morgan. 
Item 5
There was submitted a report by the Head of Asset and Procurement Solutions providing an
update on the Enterprise Strategic Commercial Partnership (ESCP) highlighting both
progress to date and future planned development 
(1)  reminding the Committee that implementation of activities within the scope of the
previous ESCP model was seen as essential to the delivery of a full range of
interconnected property, community asset and infrastructure investments to ensure
that the Council delivers on its shared ambition for inclusive growth and prosperity for
the people and communities in North Lanarkshire; 
(2)  recalling that, at its meeting in February 2019, the Committee had agreed to
commence a project to procure a partnership with a private sector provider that would
deliver the full spectrum of place shaping and asset related maintenance and
investment services and works; 
(3)  reporting that, despite positive pre-procurement market engagement, the advertised
contract opportunity failed to attract sufficient market interest to allow the project as
envisaged to proceed and, subsequently, procurement was discontinued; 
(4)  intimating that the Council remains committed to securing the benefits anticipated
from the delivery of the project and that a revised delivery model has been developed
which will deliver similar outcomes over broadly comparable timescales to the original
Page 22 of 86

Page 23

concept that will now be delivered in progressive phases and consist of several
prioritised component parts; 
(5)  advising that the revised delivery model does not, in the first phase of the project,
contemplate a formal partnering relationship with a single provider, as had been
previously envisaged, but will now create focused strategic relationships with a small
number of “best in class” service providers from the private sector; 
(6)  indicating that to, better reflect the nature of the future relationship between the
Council and the appointed service providers, the project has been renamed as the
Enterprise Project, and 
(7)  highlighting that, whilst the revised delivery model is anticipated to be more
commercially acceptable to the market, should the Phase 1 contract opportunities fail
to attract a sufficient level of interest, the Council may have to revisit the delivery
model. 
Decided: 
(1) that the discontinuation of the ESCP Project procurement procedure and the
renaming of the project as the Enterprise Project be noted;
(2) that the status of the Enterprise Project be noted;
(3) that it be agreed that the Enterprise Project continues to be progressed as detailed in
paragraph 2.2 of the report;
(4) that the commencement of the Phase 1 procurement, as detailed in paragraph 2.2.9
of the report, be approved, and
(5) that it be noted that any material changes to the revised delivery model, or the
procurement process, will be reported to the Committee. 
Link to meeting agenda, minute and supporting reports: CMIS > Meetings 
Page 23 of 86

Page 24

Appendix 5 - Report to the Policy and Strategy Committee, 1 December 2022
PRESENT 
Councillor Logue, Convener; Councillor Kelly, Vice-Convener; Councillor Roarty, Vice-
Convener; Councillors Beveridge, Boyd, Brennan, Campbell, Carragher, Di Mascio,
Fotheringham, Hume, Jarvie, Jones, Larson, Leckie, Loughran, Masterton, McBride, Nolan,
Robinson, Stevenson, A. Stubbs, Sullivan and Watson.
ALSO PRESENT 
In accordance with Standing Order 64(A) Councillor M. McCulloch attended as a substitute
for Councillor Duffy.
CHAIR 
Councillor Logue (Convener) presided.
IN ATTENDANCE 
The Chief Executive; Deputy Chief Executive; Head of Financial Solutions; Head of Legal
and Democratic Solutions; Head of Business and Digital; Head of Asset and Procurement
Solutions; Head of Strategic Communication; Head of People and Organisation
Development; Head of Performance Planning and Quality Assurance; Head of Audit and
Risk; Business Finance Manager (Resource Solutions); Technology Strategy Manager;
Commercial Contracts Manager; Business Strategy Manager, and Democratic Services
Manager.
APOLOGIES 
Councillor Duffy. 
Item 7
There was submitted a report by the Head of Asset and Procurement Solutions 
(1) providing a further update on the Enterprise Project highlighting both progress to date
and planned future development; 
(2) explaining that the project aims to achieve an integrated client function for asset
management across the Council with Phase 1 contract awards expected to be made
for the Housing and Corporate Contract in October 2023 and the Roads Contract in
December 2023 and that Phase 2 of the project, from 2026, will thereafter aim to
optimise asset related arrangements that underpin the delivery of the Plan for North
Lanarkshire and allow further integration and development of strategic supply
relationships; 
(3) providing details of procurement activity, and decisions made to date, by the Project
Board; 
(4) explaining that project resource is necessarily focused on the delivery of the Housing
and Corporate and the Roads Contracts and that suitable short-term arrangements to
provide play shaping advisory services, as and when required, are available, and the
longer-term solution will be developed as soon as project resource capacity allows; 
(5) outlining the Project Governance arrangements, and 
Page 24 of 86

Page 25

(6) indicating that a further report will be provided to Committee in May 2023 reporting
the progress of the procurement and the outcome of the options revalidation exercise
for the Housing and Corporate Contract and the progress of the Roads Contract. 
Decided: 
(1) that the status of the Housing and Corporate Contract as set out in the report be
acknowledged;
(2) that the status of the Roads Contract as set out in the report be acknowledged;
(3) that the status of the play shaping contract as set out in the report be acknowledged;
(4) that, in relation to the Housing and Corporate Contract, the decisions taken by the
Project Board, as detailed in the report, be acknowledged, and
(5) that a further report be provided to the Committee in May 2023 reporting on the
progress of the procurement and the outcome of the options revalidation exercise for
the Housing and Corporate Contract and the progress of the Roads Contract 
Link to meeting agenda, minute and supporting reports: CMIS > Meetings 
Page 25 of 86

Page 26

Appendix 6 - Report to the Council, 17 August 2023
PRESENT 
Councillor Duffy, Provost; Councillor Burgess, Depute Provost; Councillors Ashraf, Ballinger,
Barclay, Baudo, Beveridge, Boyd, Brannan-McVey, Brennan, Cairns, Campbell, Carragher,
Costello, M. Coyle, S. Coyle, Crichton, Currie, Di Mascio, Docherty, Duffy-Lawson, Dunbar,
Fisher, Fotheringham, Goldie, Hughes, Hume, Jarvie, D. Johnston, T. Johnston, Jones,
Kelly, Keltie, Khan, Larson, Leckie, Lennon, Logue, Loughran, MacGregor, Masterton,
McBride, McCluskey, McCrory, B. McCulloch, M. McCulloch, McDade, McKay, McKendrick,
McLaren, McManus, McNally, McPake, McPhilemy, Mitchell, Nolan, Patton, Roarty, Robb,
Robinson, Shevlin, Shields, Smith, Stevenson, A. Stubbs, L. Stubbs, Sullivan, Thomas,
Toner, Watson, Williams, Wilson and Woods.
ALSO PRESENT 
-
CHAIR 
Councillor Duffy (Provost) presided.
IN ATTENDANCE 
The Chief Executive; Depute Chief Executive; Chief Officer (Legal and Democratic); Chief
Officer (Asset and Procurement Solutions); Chief Officer (Audit and Risk); Chief Officer
(Housing Property Services); Chief Officer (Strategic Communication and Engagement);
Commercial Contracts Manager; Legal Manager (Enterprise); Business Manager (Resource
Solutions), Democratic Services Manager, and Principal Democratic Officer.
APOLOGIES 
Councillors Bustard, Magowan, McVey and Reddin. 
Item 2
It was agreed in terms of Section 50A(4) of the Local Government (Scotland) Act 1973,
that the public be excluded from the meeting for the following item on the grounds
that the business involved the likely disclosure of exempt information as defined in
paragraph 9 of Part 1 of Schedule 7A of the Act.
Prior to consideration of the following item of business, Councillor M. Coyle, having
declared a connection by virtue of being a Board Member of Mears, further declared
that he considered the interest so sufficiently remote that it did not preclude his
participation in consideration of the matter.
Prior to consideration of the following item of business, Councillor McPake, having
declared a connection by virtue of being a Board Member of Amey Public Services
Limited, further declared that he considered the interest so sufficiently remote that it
did not preclude his participation in consideration of the matter.
With reference to paragraph 7 of the Minute of the meeting of the Policy and Strategy
Committee held on 1 December 2022 when, inter alia, the status of the Housing and
Corporate contract as set out in the report was acknowledged, there was submitted a report
by the Depute Chief Executive 
Page 26 of 86

Page 27

(1) providing a further update on the Enterprise Project, highlighting both progress to date
and planned future development; 
(2) intimating that the Enterprise Project was a key element of the Council's work programme
and aimed to establish an integrated approach for the future delivery of repairs, maintenance
and investment in the Council's housing, corporate, and roads and infrastructure asset
portfolio; 
(3) advising that phase 1 of the Enterprise Project focussed on three substantial procurement
projects to support the agreed delivery model and secure continuity of essential service
provision: Housing and Corporate Maintenance and Improvement Services, Roads and
Infrastructure Maintenance and Improvement Services, and Place Shaping Advice and
Services; 
(4) informing that the ambition was to create strategic relationships with a small number of
best in-class private sector service providers while cultivating an integrated internal
"intelligent client" function and bolstering internal commercial capacity and expertise; 
(5) advising that the procurement of the Housing and Corporate Maintenance and
Improvement Services contract was progressing with a single bidder and that the initial
tender received on 5 May 2023 had been assessed for affordability and the extent, at this
stage of the procurement, to which the initial tender submission otherwise met the Council's
requirements; 
(6) providing details of the initial tender submission assessments costs, qualitive criteria and
the outcome of the assessment of the bid; 
(7) advising that, given the significant change in financial and economic circumstances since
the service delivery options were originally appraised, it had been agreed that it would be
prudent to re-evaluate and re-affirm the options assessment originally conducted as part of
the approved outline business case for the Housing and Corporate Maintenance and
Improvement Services contract; 
(8) setting out details of the six shortlisted options together with an assessment of each
option; 
(9) advising that the two potential delivery options which scored significantly better than
others were option 3 – "an outsourced option that reflects the current live procurement for a
single Housing and Corporate Maintenance and Improvement Services contract – not a joint
venture" and option 4 – "a Council owned ALEO with elements of insource and outsource
delivery"; 
(10) advising, that whilst both options have associated risks, option 4 has a number of
significant additional unknowns and comparatively greater risk in terms of transition and
delivery costs and in potential risk to service delivery continuity and, as a result, option 3 had
been assessed as the delivery option that best met the project objectives; 
(11) proposing that the current contracts be extended for a short period of time, of between
three and six months, in order to maintain provision of service and allow sufficient time for
the procurement exercise to be concluded; 
(12) advising that the procurement of the Roads and Infrastructure Maintenance
Improvement Services Contract commenced on 1 November 2022 and the three highest
scoring bids have been taken forward, and it was anticipated that the review of the bids
Page 27 of 86

Page 28

would be completed by the end of August 2023, after which the Council would move to the
negotiation stage, and subsequent stages of the procurement; 
(13) advising that it was anticipated that the recommendation to award the Roads and
Infrastructure Maintenance Improvement Service contract would be submitted to a special
meeting of the Council in February 2024, which would allow the new contract to be mobilised
and service delivery to commence as planned on 2 June 2024, coinciding with the expiry of
the current contract and ensuring no gap in service; 
(14) intimating that the provision of the Place Shaping Advice and Services contract would be
developed as soon as project resource capacity allowed, with work expected to commence in
Autumn 2024, and 
(15) indicating that the project board continues to meet regularly to oversee all aspects of the
Enterprise Project, and, in addition, periodic reports are provided to the Corporate
Management Team and the appropriate Committee and the project has been the subject of
two internal audit reports which both recorded a reasonable level of assurance.
Councillor Logue, seconded by Councillor Roarty, moved the recommendations contained
within the report.
Councillor Carragher, seconded by Councillor Larson, moved as an Amendment:-
“That in respect of the Housing Corporate Maintenance and Improvement Services contract,
the Council:- 
a) acknowledges that the outcome of the options revalidation exercise along with the
practical considerations and associated risks with the two highest scoring options,
advises Option 3 – continue with the current procurement - is marginally preferrable
to Option 4 – a council owned ALEO - as the delivery option that will best meet the
project objectives; set out at para 2.5 of this report;
b) agrees that for the longer term, Option 4 – a council owned ALEO – is the preferred
option, and provides the best outcomes for North Lanarkshire Council and further
agrees to the immediate development of an Outline Business Case to investigate the
implementation of a council owned ALEO to be presented to Council by February
2024;
c) agrees that the current procurement should not proceed to conclusion;
d) acknowledges that in order to allow sufficient time for the implementation of Option 4,
the current contracts with MEARS and Saltire will need to be extended for a period of
time beyond their January 2024 expiry dates, and
e) agrees that the authority to finalise the detail and the period of the contract extensions
with MEARS and Saltire is delegated to the Chief Executive.”
Councillor Lennon, seconded by Councillor Crichton, moved as a further Amendment:- 
“This Council acknowledges the document titled "The Enterprise Strategic Vehicle" and the
£1.2 to £1.8 Billion, MEARS contract over 12 years being presented for its consideration.
Concerns on Time Allocation: The Council expresses its deep concern regarding the
insufficient time provided to the Councillors for a thorough understanding, assessment, and
evaluation of the intricacies, implications, and long-term consequences of this substantial
contract. Our mandate from our constituents requires us to address such significant financial
decisions with utmost diligence. 
Page 28 of 86

Page 29

Formation of a Working Group: It is hereby recommended that a dedicated Officer and
Councillor Working Group be established with the following objectives:-
a. Facilitate a comprehensive examination of the contract.
b. Offer Councillors an avenue for added scrutiny and oversight.
c. Guarantee a thorough understanding of all associated risks, benefits, and potential
areas of enhancement.
Upholding Good Governance: By giving this contract the rigorous scrutiny it warrants, the
Council is championing the ideals of transparency, accountability, and prudent governance.
Such principles are what our constituents anticipate from their elected representatives.
Conclusion: In accordance with the above, this Council moves to adopt the amendment
recommendations, thereby reaffirming our dedication to serving the best interests of our
authority.” 
Councillor Lennon confirmed that the Working Group would make its recommendations
before the end of February 2024.
Councillor Lennon added a further recommendation, as set out below:- 
“That in order to allow sufficient time for the procurement to conclude and the new contract to
be mobilised, the current contracts be extended for a short period of time, between three and
six months, beyond their January 2024 expiry date and that authority be delegated to the
Chief Executive to finalise the detail and period of the contract extensions.”
Councillor Lennon, seconded by Councillor Smith, moved that the meeting be adjourned for
15 minutes, which was agreed.
The meeting re-convened at 5.25 pm.
Councillor Carragher withdrew her Amendment, which had been intimated in accordance
with Standing Order 24.
Councillor Lennon withdrew his Amendment, which had been intimated in accordance with
Standing Order 24.
There was submitted the following Composite Amendment in the names of Councillor
Carragher and Councillor Lennon, which had been intimated in accordance with Standing
Order 24.
a) acknowledge that the outcome of the options revalidation exercise along with the
practical considerations and associated risks with the two highest scoring options,
advises Option 3 – continue with the current procurement - is marginally preferrable
to Option 4 – a council owned ALEO - as the delivery option that will best meet the
project objectives; set out at para 2.5 of this report;
b) agrees that for the longer term, Option 4 – a council owned ALEO – is the preferred
option, and provides the best outcomes for North Lanarkshire Council and further
agrees to the immediate development of an Outline Business Case to investigate the
implementation of a council owned ALEO to be presented to Council by February
2024; 
c) agree that the current procurement should not proceed to conclusion; 
Page 29 of 86

Page 30

d) acknowledge that in order to allow sufficient time for the implementation of Option 4,
the current contracts with MEARS and Saltire will need to be extended for a period of
time beyond their January 2024 expiry dates; 
e) agree that the authority to finalise the detail and the period of the contract extensions
with MEARS and Saltire is delegated to the Chief Executive, and
f) that a dedicated Member/Officer Working Group be established with the following
objective, offer Elected Members an avenue for added scrutiny and oversight of
setting up an ALEO.”
Thereon, in terms of Standing Order 39, the vote was taken by calling the roll.
On the roll being called 34 Members voted for the Composite Amendment, as follows:- 
Councillors Ashraf, Ballinger, Barclay, Baudo, Brennan, Cairns, Carragher, Crichton, Di
Mascio, Fotheringham, Goldie, Hughes, Hume, Jarvie, D. Johnston, T. Johnston, Keltie,
Larson, Lennon, MacGregor, Masterton, McCluskey, McKendrick, McManus, Mitchell, Robb,
Robinson, Smith, A. Stubbs, L. Stubbs, Sullivan, Thomas, Toner and Williams. 
38 Members voted for the Motion, as follows:- 
Councillors Beveridge, Boyd, Brannan-McVey, Burgess, Campbell, Costello, M. Coyle, S.
Coyle, Currie, Docherty, Duffy, Duffy-Lawson, Dunbar, Fisher, Jones, Kelly, Khan, Leckie,
Logue, Loughran, McBride, McCrory, B. McCulloch, M. McCulloch, McDade, McKay,
McLaren, McNally, McPake, McPhilemy, Nolan, Patton, Roarty, Shevlin, Stevenson, Watson,
Wilson and Woods. 
34 Members having voted for the Composite Amendment and 38 Members having voted for
the Motion, the Motion was accordingly declared carried. 
Decided: 
(1) that in respect of the Housing and Corporate Maintenance and Improvement Services
contract, the Council agreed:-
(a) that following the outcome of the options revalidation exercise, along with the
practical considerations and associated risks, option 3 “continue with the current
procurement exercise”, was the delivery option that would best meet the project
objectives;
(b)  that consideration be given, before the end of the initial term of the proposed
contract, to the development of an outline business case which will investigate
the feasibility of alternate service delivery models, including the feasibility of an
ALEO, which would inform the Council's decision to extend the proposed
contract, beyond its initial term or to progress an alternative model;
(c) that the current procurement exercise proceed to a conclusion;
(d) that the results of the assessment of the initial tender submission, the associated
financial implications, and expected benefits of the proposed contract, as set out
in the report, be acknowledged;
Page 30 of 86

Page 31

(e) that the measures and mitigations to allow the Council to evidence that
progressing the procurement with a single bidder represents best value be
acknowledged;
(f) that the next steps in the procurement process, designed to facilitate
improvement, both commercial and qualitative, in the bidders initial tender
submission, be acknowledged;
(g) that, on completion of the procurement process and subject to the bidder
satisfying  the Council's requirements in full, the Council be asked to approve the
award of the  contract in February 2024, with the services targeted to commence
on 1 April 2024;
(h) that, in order to allow sufficient time for the procurement to conclude and the new
contract to be mobilised, the current contracts be extended for a short period of
time, of between three and six months, beyond their January 2024 expiry date;
(i) that authority be delegated to the Chief Executive to finalise the detail and period
of the contract extensions, and
(j) that the status of the procurement and the timeline leading to the commencement
of services under the new contract, as set out in the report, be acknowledged;
(2) that in relation to the Roads and Infrastructure Maintenance and Improvement
Service contract, the Council agreed:-
(a) that the outcome of the evaluation of the Roads Single Procurement Document
submissions, as set out in the report, be acknowledged, and 
(b) that the status of the procurement and the timeline leading to the commencement
of services under the new contract, as set out in the report, be acknowledged,
and
(3) that in relation to the Place Shaping Advice and Services Contract, the status of the
procurement and planned future development, as set out in the report, be
acknowledged. 
Link to meeting agenda, minute and supporting reports: CMIS > Meetings 
Page 31 of 86

Page 32

Appendix 7 - Report to the Policy and Strategy Committee, 7 December 2023
PRESENT 
Councillor Logue, Convener; Councillor Roarty, Vice-Convener; Councillors Beveridge,
Brannan-McVey, Campbell, Carragher, Costello, Di Mascio, Duffy, Fisher, D. Johnston,
Larson, Leckie, Lennon, Masterton, McBride, Nolan, Robinson, Smith, Stevenson, A. Stubbs,
Watson and Woods.
In accordance with Standing Order 64(A) Councillor Bustard attended as a substitute for
Councillor Loughran.
ALSO PRESENT 
Councillor Brennan.
CHAIR 
Councillor Logue (Convener) presided.
IN ATTENDANCE 
The Chief Executive; Depute Chief Executive; Chief Officer (Health and Social Care); Chief
Officer (Legal and Democratic); Acting Chief Officer (Finance); Chief Officer (Assets and
Procurement); Chief Officer (Strategic Communication and Engagement); Chief Officer
(People Resources); Chief Officer (Audit and Risk); Chief Officer (Business and Digital);
Chief Officer (Place); Commercial Contracts Manager; City Deal Manager, and Democratic
Services Manager.
APOLOGIES 
Councillors Barclay and Loughran. 
Item 14
There was submitted a report by the Chief Officer (Assets and Procurement) 
(1) reminding the Committee that it had previously received a number of reports providing an
update on the progress of the Enterprise Project and, more recently, a report had been
provided to a special meeting of the Council on 17 August 2023; 
(2) providing a further update on the Enterprise Project, highlighting both progress to date
and planned future development; 
(3) reminding the Committee that, in 2019, the Council had outlined a shared vision for long-
term growth and prosperity for the area’s community focussed on inclusivity – The Plan for
North Lanarkshire; 
(4) indicating that the Enterprise Project is a key element of the Council’s work programme to
fulfil The Plan for North Lanarkshire and aims to establish an integrated approach for the
future delivery of repairs, maintenance and investment in the Council’s Housing, Corporate
and Roads and Infrastructure asset portfolio; 
(5) providing detail, and update on progress to date, of the three substantial public
procurements to support the agreed delivery model and secure continuity of essential service
provision, namely 
Page 32 of 86

Page 33

(a) housing and corporate maintenance and improvement services; 
(b) roads and infrastructure maintenance and improvement services, and 
(c) place shaping advice and services; 
(6) detailing the project governance for Enterprise Project procurement activity including that
reports would be submitted to the Audit and Scrutiny Panel when complete, in line with the
Internal Audit Charter and the associated reporting protocol, and that key findings from the
audit process would also be included in future reports to the Committee and the Council to
inform and assist Elected Members’ decision-making, and 
(7) attaching, as Appendices to the report, 
(a) roads and infrastructure initial tender assessment outcome, and 
(b) procurement timetable and key dates. 
Decided: 
(1) that in relation to the Housing and Corporate Contract:
(a) that the positive progress with the procurement and timeline to completion, as
set out in the report, be acknowledged, and
(b) that it be noted that Internal Audit is undertaking further work as part of its
2023/24 Internal Audit Plan, and the scope of the audit and reporting
arrangements as detailed in the report;
(2) that in relation to the Roads Contract:
(a) that the positive progress with the procurement and timeline to completion, as
set out in the report, be acknowledged, and
(b) that, in order to allow sufficient time for the procurement to conclude, and the
new contract to be mobilised, the current contract with Amey be extended for
a short period of time (between three and six months) beyond its June 2024
expiry date, and
(3) that in relation to the Place Shaping Contract, the status of the procurement and
planned future development, as set out in the report, be acknowledged. 
Link to meeting agenda, minute and supporting reports: CMIS > Meetings 
Page 33 of 86

Page 34

Appendix 8 - Report to the Council, 28 March 2024 
At time of writing minute of the meeting not available. 
Link to meeting agenda, minute and supporting reports: CMIS > Meetings
Page 34 of 86

Page 35

North Lanarkshire Council    
Report
Council 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    JMcK/GP Date 02/05/24 
The Enterprise Strategic Vehicle – Housing and Corporate
Maintenance and Improvement Services Contract – Contract
Award 
From 
James McKinstry - Chief Officer (Assets and Procurement)
Brian Lafferty - Chief Officer (Housing and Property Services)
Stephen Llewellyn - Chief Officer (Housing Management)  
E-mail mckinstryj@northlan.gov.uk   Telephone 07939281102 
Executive Summary 
The purpose of this report is to seek approval to award a contract for the future delivery of
Housing and Corporate maintenance and improvement services to Mears Limited following
the completion of a procurement exercise undertaken in accordance with the Public
Contracts (Scotland) Regulations 2015 and the council’s General Contract Standing
Orders. 
The proposed contract will allow the council to access a range of maintenance, repair and
essential compliance services for its Housing and Corporate property portfolio, under a
single contractual agreement. These include: 
• gas servicing;
• planned maintenance on tenanted, corporate and empty properties;
• responsive repairs;
• essential compliance services (including; fire safety, gas safety, electrical testing and
asbestos management);
• some related call handling services;
• investment projects/programmes; and
• ad-hoc minor works. 
The proposed contract will have a minimum initial period of eight years with contract
extensions available, at the council’s discretion, to a maximum contract duration of twelve
years. 
The estimated upper financial limit of the proposed contract, over the maximum duration
of the contract, including contingency, is £1.8 billion. 
From the outset the council had a strong conviction that the proposed contract needed to
be more than a straightforward buyer - contractor transactional arrangement. Pre-
procurement development work and early market engagement indicated that a strategic
relationship, with long term commitment, a focus on operational delivery, joint improvement
and high level of cooperation had scope to achieve added value and long-term gains for
North Lanarkshire’s residents, communities, and businesses. 
Item 5
Page 35 of 86

Page 36

Recommendations 
It is recommended that the Council: 
1. approve the award of the contract, as detailed in this report, for Housing and
Corporate Maintenance and Improvement Services to Mears Limited. 
The proposed contract will deliver a range of service improvements, increase efficiency
and importantly create significant social value for the local area at a scale not achievable
from current practice. 
Should the Council approve the award of the proposed contract, the contractual
documentation will be concluded, and the contract mobilised. ‘Day one’ services are now
targeted to commence on 1 July 2024, with the remaining services commencing thereafter
on a phased basis in accordance with the agreed service transition plan. 
Project Governance 
The Project Board meets regularly to oversee all aspects of the Enterprise Project, in
addition periodic reports are provided to the corporate management team and Committee. 
Internal Audit has reported previously on this project on three occasions, with the reports
providing generally positive assessments of the project governance arrangements. Internal
Audit has recently completed further work in relation to aspects of the Enterprise Project
as part of the 2023-24 Internal Audit Plan. The results of the latest audit and the
management response was reported to the meeting of the Council on 28 March 2024. 
Page 36 of 86

Page 37

1. Background 
In 2019, North Lanarkshire Council (the ‘council’) outlined a shared vision for long-term
growth and prosperity for the area’s communities focused on inclusivity - plan for North
Lanarkshire (the ‘Plan’).
The Enterprise Project is a key element of the council's work programme to fulfil the
Plan. It aims to establish an integrated approach for the future delivery of repairs,
maintenance and investment in the council’s housing, corporate and roads and
infrastructure asset portfolio.
Phase one of the Enterprise Project focuses on three substantial public procurements
to support the agreed delivery model and to secure continuity of essential service
provision;
1. Housing and Corporate maintenance and improvement services (the ‘Housing and
Corporate Contract’);
2. Roads and infrastructure maintenance and improvement services (the ‘Roads
Contract’); and
3. Place shaping advice and services (the ‘Place Shaping Contract’).
Its ambition is to:
• develop an innovative new approach to delivery for a full range of interconnected
property, community asset and infrastructure investments to ensure the Council
delivers on its shared ambition for inclusive growth and prosperity for the people
and communities of North Lanarkshire;
• create strategic relationships with a small number of best-in-class, Tier 1, private
sector contractors while cultivating an integrated internal ‘intelligent client’ function
and bolstering internal commercial capacity and expertise;
• support the delivery of key policy themes, such as social value, fair work practices;
and
• deliver a range of service improvements and increase efficiency.
The Policy & Strategy Committee has previously received a number of reports updating
on the progress and development of the Enterprise Project and in its previous form, the
Enterprise Strategic Commercial Partnership:
• Enterprise Strategic Commercial Partnership reports:
• February 2019;
• March 2020;
• Enterprise Project reports:
• December 2021; 
• December 2022; and
• December 2023.
In addition, a report was provided to a meeting of the Council on the 17 August 2023.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (24) Review and design services around people, communities, and
shared resources
Page 37 of 86

Page 38

The Council, at the meeting of 17 August 2023, agreed that in relation to procurement
of the Housing and Corporate Contract that the following actions be progressed:
• the current procurement exercise should proceed to a conclusion; and
• on completion of the procurement process and subject to the Bidder satisfying the
council's requirements in full, the Council be asked to approve the award of the
contract in February 2024, with the services targeted to commence on a phased
basis from 1 April 2024.
This report confirms the outcome of the procurement exercise for the Housing and
Corporate Contract, the financial implications of the award of the proposed contract,
the benefits that the contract will deliver, and the outcome of the work undertaken to
allow the council to evidence that moving to contract award from a procurement with a
single bidder represents Best Value.
The existing Housing and Corporate maintenance contract currently delivered by
Mears Scotland LLP in a Joint Venture with the council and the Gas Servicing contract
with Saltire Facilities Management Ltd were both due to expire in January 2024. 
The short-term extensions to the current contracts with Mears Scotland LLP and Saltire
Facilities Management Ltd, approved at the meeting of the Council on 17 August 2023,
have been actioned and both contracts are now due to expire on 30 June 2024. 
The award of the proposed contract will provide the successor arrangements to the
current contracts. 
2. Report 
2.1 The proposed contract will allow the council to access a range of maintenance, repair
and essential compliance services for its Housing and Corporate property portfolio,
under a single contractual agreement. These include:
• gas servicing;
• planned maintenance on tenanted, corporate and empty properties;
• responsive repairs;
• essential compliance services including; fire safety, gas safety, electrical testing,
water testing and asbestos management;
• some related call handling services;
• investment projects/programmes; and
• ad-hoc minor works. 
2.2 The services will be delivered to the following asset types including but not limited to: 
• Housing – approximately 37,000 homes, including housing for mid-market rent,
housing for social rent, retirement housing, sheltered housing and supported needs
housing; and
• Corporate - approximately 1200 buildings, which include public buildings,
educational establishments, community facilities and other miscellaneous
buildings. 
Page 38 of 86

Page 39

2.3 The number of properties to be maintained may reduce or increase during the term of
the proposed contract as a result of demolition, disposal, acquisition, new supply or
other legislative measures.
The Proposed Contract - scope, duration and estimated spend
2.4 The scope of the proposed contract comprises two main parts:
Core Services
• The provision of planned maintenance on tenanted housing, corporate and empty
properties, responsive repairs, gas servicing and essential compliance services
(including: fire safety, gas, electrical and water quality testing, asbestos
management and the New Core Services) (collectively the ‘Core Services’). Core
Services are generally revenue funded with an estimated value of circa £60m per
annum; and
• to augment the services provided under the current Housing and Corporate
maintenance contract and the Gas Servicing contract, there are an additional 42
individual contracts in place. The proposed contract will incorporate these 42
individual contracts, on a phased basis, including gas servicing (the ‘New Core
Services’) in a single contractual agreement. 
Core Projects
• The provision of investment projects/programmes, (the ‘Core Projects’) which
include life cycle replacements of components of assets at scale; including but not
limited to replacement of kitchens, bathrooms, flooring, roofs, mechanical and
electrical installations, heating installations, windows, doors, decoration works,
drainage works, communal area works, tower block works, and other related works.
Core Projects are generally funded from capital with an estimated value of circa
£60m per annum.
2.5 Further detail as to the services that will be provided under the proposed contract and
the individual contracts that will be incorporated in the proposed contract was included
in the report considered at the meeting of the Council on 17 August 2023. For
convenience, this information is reproduced as Appendix 3 and Appendix 4
respectively.
2.6 The proposed contract will have a minimum initial period of eight years with contract
extensions available, at the council’s discretion, to a maximum contract duration of
twelve years. When considering any extension(s) to the contract, the council may take
into account factors such as the contractor’s performance, changes in service
requirements and consideration of alternate service delivery options.
2.7 The proposed contract was advertised with an estimated maximum value of £1.8bn
over the maximum twelve-year contract period. The estimated value of the proposed
contract was derived from analysis of historical spend data, adjusted where required,
to reflect future service requirements and estimated order volumes. The estimated
contract value ensures that there is sufficient capacity within the proposed contract to
accommodate all aspects of the contract scope, and a contingency allowance to
accommodate growth and unforeseen peaks in demand. 
2.8 The proposed contract does not guarantee the contractor a minimum level of business.
The actual value of the contract will be determined by the work types and volumes the
council orders, the extent to which the contractor secures Core Projects, and ultimately
Page 39 of 86

Page 40

by budget availability. This means that the actual total value of the proposed contract
when in operation, will fall somewhere in the range of between £720m1 and £1.8bn2. 
1Assumes that the contract is in operation for the maximum 12-year contract term, Core Services only and that
no contingency is required.
2Assumes that the contract is in operation for the maximum 12-year contract term, Core Services and all Core
Projects and that all of the contingency is required. 
Exclusivity and the Contractors obligation to provide the services
Core Services
2.9 Subject to the satisfactory performance of the contract, the contractor shall have an
exclusive right and obligation to act as the council’s external provider in the delivery of
Core Services during the term of the contract.  
2.10 The contractor is obligated to provide the Core Services.  Where the contractor fails to
deliver the Core Services in accordance with the contract the council shall be entitled
to:
• remove the contractor's exclusivity (in whole or in part) for such period of time as
the council may determine; and/or 
• exercise its contractual options in respect of the contractor’s failure to carry out the
services or meet quality standards.
Core Projects
2.11 The council will provide the contractor with the ‘first opportunity’ to submit proposals for
the delivery of individual Core Projects as described in the Annual Service Delivery
Plan. 
2.12 Where the council issues a project request for a Core Project and the Core Project is
included in the Annual Service Delivery Plan, the contractor is obligated to submit a
project response for and (where required by the council) to provide such Core Project. 
Where the Core Project is not included in the Annual Service Delivery Plan the
contractor shall use all reasonable endeavours to submit a project response for such
Core Project within the required timescales and (where a Core Project Contract is
agreed by the council) deliver the Core Project.
2.13 The decision to issue a project request is at the council's sole discretion. The
contractor’s right of ‘first opportunity’ is awarded at the discretion of the council.  In
reviewing the position, the council may take into account factors such as:
• the contractor's performance of its obligations under the contract; 
• the quality and/or competitiveness of previous project responses;
• the council’s timescales; and
• the contractor’s capacity.
2.14 If the contractor refuses to submit a project response for or, in the reasonable opinion
of the council, is unable or unwilling to submit a project response for or provide all or
any part of the Core Projects, the council may remove the contractor's ‘first opportunity’
and procure replacement services from an alternate provider for such period as the
council deems appropriate.
Page 40 of 86

Page 41

2.15 Notwithstanding paras 2.11 to 2.13, the council reserves the right at its discretion to
procure Core Projects from alternative provider(s) in circumstances where:
• the council rejects the contractor's project response; 
• the contractor's project response is not submitted in the timescales required by the
council or not submitted to the level of detail reasonably required by the council;
• the council considers (acting reasonably) that the contractor is unable or unlikely to
meet the council’s requirements in relation to the project request; 
• the contractor has failed to:
• deliver its Social Value and Fair Work commitments; and/or
• provide the services in accordance with the performance indicators;
• the council is entitled to exercise its options in respect of the contractor’s failure to
carry out the services or meet quality standards;
• the contractor has committed a default which is a material breach of the contract;
or
• timescales or circumstances are such that the council must seek proposals from a
wider market representation.
2.16 This commercial approach ensures that the council will always pay the ‘market rate’ for
Core Projects.
The Procurement Process
Pre- procurement activity
2.17 The procurement of the service requirement was complex and required significant
market engagement, stakeholder consultation, scope and price modelling, contract
drafting, data gathering, and analysis. 
2.18 The pre-procurement preparatory work, undertaken collegiately with internal service
teams and drawing on advice and expertise from the project’s external advisers,
involved a comprehensive review of terms and conditions of contract, service
requirements, pricing approaches, and performance monitoring to ensure that the
successor contracts to the current arrangements deliver commercial advantage for the
council, the public purse and secure the intended wider socio/economic benefits for
North Lanarkshire.
2.19 A Prior Information Notice (PIN) was published on 21 September 2021 and received
103 notes of interest from potential contractors. Thereafter, between October 2021 and
March 2022, the council conducted 4 rounds of market engagement. The engagement
took the form of online plenary events, followed by one-to-one meetings between
potential bidders and the Project Team and senior stakeholders. 
2.20 The council also issued a number of supplier surveys which resulted in the sharing of
valuable information which helped inform the final design of the proposed contracts and
to structure the procurement approach in a way that would deliver the project objectives
and encourage a level of market participation that would support a viable procurement. 
2.21 The extensive interaction with potential bidders provided the council with a reasonable
degree of confidence that the contract opportunity would attract sufficient market
interest and an expectation that the procurement could be progressed to a successful
conclusion.
2.22 The council also held an information event in conjunction with Supplier Development
Programme to signpost the tender opportunity, explain the council’s approach, the
Page 41 of 86

Page 42

potential implications and opportunities for the market, including small and medium
sized organisations (‘SMEs’) to engage with the contract opportunity.  
2.23 An update on the pre-procurement activity and the challenging prevailing market
conditions, which may adversely impact on the number of potential bidders participating
in the procurement, was provided to the Policy and Strategy Committee in December
2021. 
The procurement procedure
2.24 The procurement procedure was conducted in accordance with the Public Contracts
(Scotland) Regulations 2015 (the ‘Regulations’) and the council’s General Contract
Standing Orders. The tender process was conducted digitally using the Public
Contracts Scotland Tender (electronic PCS-T) system. 
2.25 The procurement process was undertaken in accordance with the Competitive
Procedure with Negotiation procedure (Regulation 30 of the Public Contracts
(Scotland) Regulations 2015), which involves two post-selection stages of tendering
(Initial Tenders and Final Tenders, both with clarification exchanges as required) with
an intervening period of negotiation. An overview of the procurement procedure, current
status and timeline for completion of the procurement and mobilisation of the proposed
contract is summarised in Figure 1.
Figure 1 
2.26 The Contract Notice and supporting procurement documentation was published on the
UK Find a Tender Portal and the Public Contracts Scotland Portal on 21 June 2022,
this formally launched the procurement. 
Selection stage
2.27 Despite the comprehensive and positive pre-procurement market engagement detailed
at paras 2.19 to 2.23 only one request to participate in the procurement (the ‘’Selection
Stage submission’’) was received by the 12 August 2022 response deadline. The
Selection Stage submission was received from Mears Ltd (the ‘Bidder’).
2.28 The Selection Stage submission was evaluated against the council’s predetermined
published selection criteria, which included economic and financial standing, business
probity, technical and professional ability, and organisational approaches to fair work
and environmental practices.
2.29 The evaluation determined that the Selection Stage submission met all of the council’s
selection criteria and could be progressed to the next stage of the procurement. 
Page 42 of 86

Page 43

2.30 The decision to proceed with a single bidder, related legal advice and the actions to be
taken to evidence Best Value in a single bidder scenario were set out in the report to
the Policy and Strategy Committee on 1 December 2022.
2.31 The selection stage criteria and outcome of the evaluation of the Selection Stage
submission was included in the report considered at the meeting of the Council on 17
August 2023, for convenience, this information is reproduced as Appendix 5.
Initial Tender stage
2.32 An invitation to submit an Initial Tender was issued to the Bidder on 13th March 2023.
2.33 The Bidder’s Initial Tender submission (the ‘Initial Tender submission’) was received
by the 5 May 2023 response deadline. The Initial Tender submission was assessed
against the council’s agreed predetermined published award criteria, which included
service delivery, social value, contract terms and commercial approaches.
2.34 Assessment of the qualitative aspects of the Initial Tender submission comprised, at
this stage of the procurement, an assessment, as to whether each of the qualitative
award criteria, either ‘met the requirement’ or as ‘not yet meeting the requirement’. 
2.35 The assessment determined that the Initial Tender submission met 19 of the 26
qualitative award criteria assessed at this stage, with 7 of the qualitative award criteria,
assessed as ‘not yet meeting the requirement’. The ‘Legal’ criterion was not assessed
at this time.
2.36 The 7 qualitative award criteria assessed as ‘not yet meeting the requirement’, were
not considered to be of significant concern at this time, as the next steps in the
procurement process were designed to facilitate improvement in both the qualitative
and financial aspects of the Initial Tender submission and that the consideration of a
positive contract award decision would be contingent on the Bidder meeting the
council’s requirements in full. 
2.37 Assessment of the financial elements of the Initial Tender submission indicated that;
• the cost of providing the Core Services under the proposed contract would increase
by 9.31% when modelled against current costs (the ‘Should Cost Model, see para
2.86(c)’); and
• the Bidder would only secure a small proportion of the available Core Projects as
its pricing proposal is above the council’s Should Cost Model. However, it was
noted that this position may change as the procurement progressed and/or through
further Best Value testing when the proposed contract was in operation.  
2.38 The high-level award stage criteria and outcome of the assessment of the Initial Tender
submission was included in the report considered at the meeting of the Council on 17
August 2023. Appendix 6 contains further detail of the award criteria and for
convenience the outcome of the assessment of the Initial Tender submission is
reproduced as Appendix 7.
Negotiation stage
2.39 The negotiation stage commenced on 5 September 2023 and completed on 30 October
2023.
2.40 The negotiations focused on key technical, operational, legal and commercial issues
aimed at the Bidder improving on its Initial Tender submission in its Final Tender
submission. The negotiation stage was also used to emphasise to the Bidder any
Page 43 of 86

Page 44

elements of its Initial Tender submission which ‘as yet does not meet’ the council’s
requirements, with the Bidder encouraged to improve its proposals appropriately in its
Final Tender submission in accordance with the procedure set out in the Regulations.
2.41 The project plan made provision for three rounds of negotiation with the Bidder,
however given the complexity, the range and importance of the discussions, two
additional rounds of negotiation were required.  
2.42 The negotiations were positive, providing a high degree of confidence that the
improvement opportunities and other matters discussed during the negotiations would
be confirmed / addressed in the Bidder’s Final Tender submission.
Final Tender stage
2.43 An invitation to submit a Final Tender was issued to the Bidder on the 30 October 2023
with the Bidder providing its Final Tender submission by the 20 November 2023
response deadline.  
2.44 The Final Tender submission was evaluated against the council’s predetermined
published award criteria, the award criteria remained unchanged from the Initial Tender
stage.
2.45 The award criteria included technical and commercial sections that were evaluated
against the following high-level criteria and weightings: 
• Quality 60% (Technical); and
• Price 40% (Commercial).
2.46 Evaluation of all stages of the procurement was undertaken in accordance with the
approved evaluation plan for each respective stage of the procurement. Evaluation was
undertaken by a multi-disciplinary team, with over 40 individual evaluators involved in
the evaluation of each of the Selection stage, Initial Tender, and Final Tender
submissions. 
2.47 The price and quality evaluations were undertaken concurrently but remained separate
and independent to each other.  The scores for both were consolidated at the final
tender stage to provide an overall score.
2.48 Price evaluation
Assessment of the financial elements of the Final Tender submission confirm that:
Core Services
2.49 The cost of providing the Core Services under the proposed contract would increase
by 4.96% when modelled against current costs (the ‘Should Cost Model see para 2.86
(c)’). 
2.50 While there will be some variation in the value of work that is instructed though the
proposed contract, using the estimated value of Core Services of circa £60m per
annum as a proxy, this would equate to an increase of circa £2.976m per annum
excluding an inflation adjustment. One off contract mobilisation costs, which include
the development of IT business interfaces and associated hardware/software,
rebranding, training and development, and the expansion and upgrades to operational
premises, of circa £992,000 would also be payable in the first year of the proposed
contract.
Page 44 of 86

Page 45

2.51 The phased mobilisation of the New Core Services into the proposed contract will defer
the full cost increase impact for these services until years 3/4 of the proposed contract.
This is not reflected in the Should Cost model but is a transitional cost benefit for the
council.
2.52 The cost of providing the Core Services under the proposed contract is assessed, as
generally representing fair market rates and falling within acceptable parameters.
Core Projects
2.53 For Core Projects, with a few exceptions, the Bidder’s pricing proposal is generally
above the council’s benchmarks. The extent to which the contractor secures Core
Projects will be determined by Best Value testing via the engagement process set out
at paras 2.11 to 2.15.  Should the council determine that the contractor’s offer to deliver
a Core Project does not constitute Best Value, then the council will procure and manage
the requirement by other means. This commercial approach ensures that the council
will always pay the ‘market rate’ for Core Projects.
Financial Implications
2.54 The cost implications of the proposed contract need be considered in the context of
current economic volatility, general market conditions and a recognition that some of
the improvements, including social value, the service credit model, enhanced
performance monitoring and reporting, incorporated in the proposed contract, have
upward cost implications.
2.55 An increase in costs is not unique to this procurement, construction cost consultants’
reports, in the public domain, reporting construction costs while reducing from previous
highs, remain above the rate of inflation.  Cost consultants’ reports indicate tender price
inflation of between 3.7% and 5.5% in 2023 and estimate further rises of between 2.7%
and 4.5% and 3% and 3.5% in 2024 and 2025 respectively. In addition, the General
Fund and Housing Revenue Account budget processes for 2024/25 reflected market
estimates of contract inflation.      
2.56 For some recent capital projects the council has recently experienced double digit
percentage increases in tendered costs when compared with pre-procurement
estimates.
2.57 It is long established economic impact modelling principle, that money spent and
retained in the local area has a significant multiplier effect as the spend circulates
further through the local economy. General economic impact assessment modelling
estimates that, for every £1 spent by, in this case, the council, there would be at least
£3.00 of benefits delivered to North Lanarkshire as a whole by increasing output,
increasing access to employment opportunities and improving health and social
mobility, plus a series of other positive outcomes.
Evaluation of Quality criteria 
2.58 The project objectives comprise a number of factors designed to contribute to the
delivery of the Council’s vision for the area and wider policy commitments. Cost, while
an important factor, is not the only consideration.
2.59 Evaluation of the qualitative aspects of the Final Tender submission comprised the
scoring of each of the qualitative award criteria using the agreed marking scheme, all
27 award criteria were scored at the final tender stage.
Page 45 of 86

Page 46

2.60 The evaluation determined that the Final Tender submission met all 27 of the council’s
qualitative award criteria, most by a comfortable margin, Table 1 provides further detail.
Table 1
Possible scores Number of
award criteria
Percentage of
award criteria
Score of 100 (max possible score) 4 15%
Score of 75 17 63%
Score of 50 (min scoring threshold required) 6 22%
Score of 25 Nil Nil
Score of zero (min possible score) Nil Nil   
Total 27 100% 
2.61 The evaluation of the qualitative criteria was conducted in accordance with the
methodology set out in the procurement documents.  The outcome of the qualitative
evaluation is shown in Table 2.  
Table 2
Level 1
Criteria
Bidder 
Weighted Quality
Score
(max 60%) 
Quality 42.35% 
2.62 Appendix 8 provides further detail of the outcome of the evaluation of the qualitative
criteria.
Most Economically Advantageous Tender
2.63 The total scores for Price and Quality were combined to provide the overall outcome of
the evaluation of the Final Tender submission (the identification of the Most
Economically Advantageous Tender). Table 3 provides the final overall outcome of the
procurement.
Table 3
Bidder Quality score
(max 60%) 
Price score
(max 40%) 
Overall score  Overall rank
Mears Limited 42.35% 40.00% 82.35% 1 
2.64 As identified in Table 3, the Bidder who has submitted the most economically
advantageous Final Tender is Mears Limited (the ‘Preferred Bidder’) and is therefore
recommended for contract award.
2.65 A summary of the procurement process is provided as Appendix 1 and the SME status
and location of Bidders as Appendix 2.
Page 46 of 86

Page 47

Comparison of the position at Initial Tender stage with the Final Tender stage
2.66 The report to the meeting of the council on 17 August 2023 indicated that
improvements/refinements to the Initial Tender submission could reasonably be
expected as the procurement progressed through the Negotiation stage to the final
tender stage. 
2.67 The anticipated improvement opportunities and other matters discussed and agreed
during the Negotiation stage were confirmed in the Preferred Bidder’s Final Tender
submission, the key outcomes are set out in Table 4.
Table 4 
Description Initial Tender
submission
Final Tender
submission
a. Cost implications – estimated
percentage variation when compared
with current costs (the ‘Should Cost
Model’ para 2.86 (c)).
plus 9.31% plus 4.96%
b. Extent to which the council’s
qualitative criteria are met (27 criteria) 
19 of 26* all 27 
c. Terms and conditions of contract not yet agreed agreed
d. Mobilisation costs  £992,000 £992,000 
*The Legal qualitative criterion was not assessed at the Initial Tender stage.
Price Stability
2.68 The Preferred Bidder’s tendered prices and percentages will remain fixed during the
tender validity period, thereafter, adjusted in line with good industry practice by the
application of the Building Cost Information Service (BCIS) General Building Cost
Index.  
2.69 The first price adjustment will be made on the contract commencement date and
annually thereafter throughout the contract term.
Supply chain opportunities
2.70 The proposed contract will provide subcontract opportunities for local and regional
organisations as not all the services to be provided under the proposed contract will be
delivered directly by the contractor.
2.71 For Core Services, around 30% (by value) of the services will initially be delivered
through a supply chain, established and managed by the Preferred Bidder. Where the
contractor secures Core Projects, the proportion of the services that will initially be
delivered through a supply chain, established and managed by the Preferred Bidder is
around 80% (by value).
Social Value
2.72 Delivering social value at scale to benefit the local area was a key objective of the
procurement. The community benefits approach was designed to deliver targeted
benefits specific to the market and deliver outcomes such as:
Page 47 of 86

Page 48

• creating pathways into employment, training and apprenticeship opportunities for
residents and priority groups; 
• supporting and creating significant and meaningful education initiatives to maximise
opportunities for children and young people to realise their full potential; 
• addressing skills shortages and improve the skills of local people for in-demand
roles including digital skills; 
• ensuring there are significant opportunities within the supply chain for local
businesses, the third sector, and supported businesses; and
• engaging and listening to residents, communities, and businesses to maximise
participation, capacity, and empowerment to ensure that the contract is making a
real difference and delivering a positive impact across all communities.
2.73 To illustrate the positive step change that the proposed contract will secure, the
Preferred Bidder’s social value commitments, which will be contractualised, include:
• creation of new jobs over the first three years of the contract, recruitment where
possible from the local area; 
• commitment to provide a significant craft and modern apprenticeship programme; 
• scope for additional apprenticeships dependent on the extent to which the
contractor secures Core Projects; 
• commitment to work placements over the duration of the contract, working with local
schools, colleges and employability programmes and engaging with NL Education
Future Friday strategy to offer placements;
• continued commitment to employing locally; 
• continue to contract with voluntary, community and social enterprises through its
supply chain;
• financial commitment to an innovation fund;
• financial commitment to integrate the new services into their IT systems and
interfaces with the council’s client management system;
• continued commitment to a head office and operational depots in North Lanarkshire
with upgraded accommodation;
• commitment to diversifying its workforce through initiatives such as “Tradeswomen
into Maintenance”, and the “Armed Forces Covenant”;
• commitment to employee volunteering for local charities or community projects; and
• offer knowledge and experience of developing training colleges to help the council
realise its ambition of creating its construction skills academy.
The full list of the social value commitments contained in the Preferred Bidder’s Final
Tender submission is provided as Appendix 9.
Contractual Benefits
2.74 The proposed contract is markedly different from the current contract. The proposed
contract and associated business change will secure a range of improvements and
benefits when compared with the current contract and business practices including:
• all housing maintenance and repair services and potentially investment
projects/programmes from one contractor either directly or via supply chain
arrangements established and managed by the contractor;
• updated Schedule of Rates and supporting specifications;
• removal of redundant Schedule of Rates;
• continuity of essential service provision;
Page 48 of 86

Page 49

• a large contract which adopts partnering principles that is aligned to deliver service
improvement and increased value for money with appropriate risk/reward
mechanisms in place; 
• granular visibility over individual cost components; 
• further development of digitisation to support service delivery and reporting;
• designed to provide local and regional expertise by attracting and keeping SMEs;
• built in legal protections: contractual terms based on public sector model conditions
(with appropriate adjustments) designed to protect public sector buyers; 
• investment projects/programmes adopting standard industry terms: various SBCC
forms of contract;
• supports council key policy themes such as: social value, sustainability, fair work
practices and prompt payment;
• an environmental impact reduction plan to capture and monitor the contractor’s
commitments to emission reductions over the contract term (aligned to Scottish
Government climate reduction measurement and the council’s net zero priorities to
2030 and beyond);
• enhanced approach to performance monitoring through the use of strategic and
operational Key Performance Indicators (KPI’s), including the introduction of a
Service Credit Model with financial deductions for failure to meet KPI’s; 
• an internal client team that is more effective and focused on meeting key objectives,
through performance monitoring, forward planning, contract management and
improvement initiatives, rather than handling day to day operational issues; 
• a fully integrated internal client team that has access to good quality data in which
to shape joined up strategies for asset management and meeting the needs of
service users;
• a re-organised internal client team with the capacity, capability and experience to
manage and deliver against objectives that link with the contract; 
• flexibility in service to continuously evolve to reflect changes in financial and other
circumstances; and
• to drive continuous improvement and seek opportunities to promote ongoing
integration with other teams and initiatives within the wider council.
Full details of the benefits and improvements that the proposed contract will deliver,
were provided in the report to the meeting of the Council on 17 August 2023, for
convenience, this information is reproduced as Appendix 10.
Fair Work First Practices 
2.75 The council is committed to the delivery of high-quality public services and recognises
that this is dependent on a workforce that is well rewarded, well-motivated, well-led,
has access to appropriate opportunities for training and skills development, is diverse
and is engaged in decision making. 
2.76 Within the procurement documentation, the Bidder was asked a question on their
approach to Fair Work First and payment of the real Living Wage to their workforce.
This question was in accordance with the applicable Scottish Government guidance on
“Fair Work First in Scottish Procurement”, the Scottish Government’s policy for driving
high quality and fair work across the labour market in Scotland.
2.77 The Preferred Bidder has committed to adopt the principles of Fair Work First, by
applying Fair Work criteria to its directly employed workforce and through its tender
processes with its supply chain.   It is committed to Mears Scottish Responsible
Page 49 of 86

Page 50

Business Charter and will encourage its supply chain to make similar
commitments.  The charter includes the following: 
• paying the Scottish Living Wage, and include fair work principles in its operations;
• having resident and tenant representation as part of its scrutiny arrangements and
service design;
• improving the Environmental, Social, Governance and economic wellbeing of the
area in which Mears operates;
• paying small businesses on time;
• making it simple, straightforward and easy for local SMEs, social enterprises and
supported businesses to access supply chains opportunities;
• making firm and achievable commitments to support Scotland’s target of Net-zero
emissions by 2045;
• having a social responsibility to pass on skills to local communities;
• being transparent in its financial and business reporting;
• working harder to address equality and diversity and submitting to an independent
audit of all policies and procedures to enable fair access for all; and
• having a balanced governance board.
Contract Management
2.78 It is recognised that a positive stepped change in the council’s approach to contract
management will be required in line with good industry practice to ensure that the
proposed contract is managed effectively.
2.79 The foundations for the required improvement in the management of the proposed
contract were laid in the pre-procurement development of performance measures and
standards, monitoring and reporting provisions, contractual protections and remedies,
these then integrated in the procurement process and embedded in the contract
drafting.   
2.80 The enabling provisions in the proposed contract need to be implemented as part of
the transition arrangements to ensure, that in operation, the new contract is managed
effectively, the benefits are secured, risks managed and the opportunities for
continuous improvement maximised. 
2.81 The essential elements for effective contract management will be in place for contract
commencement, with the more advanced approaches developed and introduced, as a
priority, on a phased basis thereafter. The approach will involve multiple layers of
governance to provide essential scrutiny and oversight and set out clear roles and
responsibilities for contract management and contract development activity.
2.82 Housing Property Services, as the ‘contract owner’ will be responsible for the
development and introduction of the improved contract management approach and
implementation timeline.
2.83 Elected members will receive regular reports on contract and contractor performance
through an enhanced suite of strategic and operational performance indicators at the
relevant committee. 
Page 50 of 86

Page 51

Best Value
2.84 Recognising the absence of competitive tension in a ‘single Bidder scenario’, the report
to the Policy and Strategy Committee in December 2022 set out a number of measures
that have been incorporated in the procurement, tender evaluation and the
management of the proposed contract to mitigate risks associated with the ‘single
Bidder scenario’. 
2.85 Collectively, these measures were designed to provide comparator(s) to the Bidder’s 
Initial and Final Tender submissions to ensure that the council could:
• best understand the future cost of providing Core Services (affordability); and 
• evidence achievement of Best Value in a ‘single bidder scenario’.
2.86 The mitigations, the actions taken and the outcomes, are set out in paras 2.86(a-f):
a) Identify external benchmarks to validate costs;
Desktop research was undertaken, to identify suitable benchmarks commensurate
with the scope, scale, geography and specification of the services included in the
proposed contract.  
Given the uniqueness of the project and the ‘whole service’ nature of the contract
requirement no ‘like for like’ comparable reference points were identified. 
A number of potential benchmarking reference points for subsets of the ‘whole
service’, mostly at a very granular level were identified, however there was a low
degree of confidence in the basis of comparison for these, and the reliance that
could be put on the outcome of analysis. 
Notwithstanding the lack of confidence in the basis of comparison, the identified
benchmarking reference points were analysed. Not unexpectedly, the outcome of
the analysis was mixed, some benchmark reference points compared favourably,
others did not. The outcome of the benchmarking exercise was therefore
inconclusive and does not provide reliable insight as to the overall determination of
Best Value. 
Appendix 11 provides further details of the benchmarking exercise.    
b) Expect the Bidder to demonstrate value by using transparent pricing and other
mechanisms (‘open book’);
The Bidder’s commitment to transparent pricing and other mechanisms (‘open
book’) was confirmed in its Final Tender submission for Core Services and for those
in-scope items which could not be costed at the procurement stage e.g. narrative
orders, Core Projects. 
The pricing model in the council’s existing contracts only provide an overall total
price for each Schedule of Rates item. The tender pricing model for the proposed
contract was structured to include a breakdown of each Schedule of Rates into its
component parts (labour, materials, plant, management fee and profit) to improve
transparency of pricing.   
Page 51 of 86

Page 52

c) Develop a ‘Should Cost’ model; 
A Should Cost Model was developed to represent what the council would expect to
pay for the proposed contract and to allow comparison with the cost of the current
contracts.  The Should Cost Model, aligned with good industry practice, used a
number of existing sources of information including the schedule of rates costs of
current contracts for the in-scope services.  Adjustments were made to the model
to reflect the different pricing approaches included in the proposed contract (e.g.
fixed cost per property), anticipated changes in rates based on market intelligence
and adjustments for inflation.  
The Should Cost Model also included an estimated future demand frequency for
each schedule of rates item to represent a typical year’s work for the services using
historical information from existing contracts, and where appropriate, adjusted for
anticipated changes in future demand.
The Should Cost Model allowed a comparison to be made with the financial
elements of the Bidder’s Initial and Final Tender submissions to identify the extent
of any variation between the prices and rates in these submissions when compared
with the Should Cost Model.  
Further adjustments were then made to the Should Cost Model to take account of
any aspects in the Bidder’s Initial and Final Tender submissions which were
different to those present in the current arrangements, e.g. the extent of the social
value offer, volume discount, efficiency savings, these adjustments intended to
allow the best ‘like for like’ comparison between the Should Cost Model and the
financial elements of Bidder’s Initial and Final Tender submissions.   
As the scope and the requirements of the proposed contract differ from the current
arrangements it is not possible to compare all costs on the same basis, however
around 80%, by value, are comparable. 
The comparison between the Should Cost Model and the financial elements of the
Bidder’s Initial and Final Tender submissions is the means by which the percentage
increase in the cost of Core Services under the proposed contract, detailed at paras
2.37 and 2.49 was calculated.
Given that the construct of the Should Cost Model is derived from reliable data
sources, the high match rate that it provides with current costs, and the absence of
a meaningful output from the external benchmarking exercise, the Should Cost
Model was assessed as being the primary and most reliable means to understand
the financial implications of the proposed contract.   
The Should Cost Model allows the council to best understand the future cost of
providing Core Services (affordability).
d) to reduce the scope of work which is granted on an exclusive basis;
Under the proposed contract, the contractor will not have an exclusive right to
deliver Core Projects.  The contractor will only be awarded this work if the council
is satisfied that the contractor’s offer for Core Projects, on a case-by-case basis,
represents Best Value and otherwise meets the council’s requirements, see paras
2.11 to 2.15. 
Page 52 of 86

Page 53

Under the proposed contract, the contractor shall have an exclusive right and
obligation to provide the Core Services. However, the exclusivity arrangements
may be partially or fully withdrawn if the contractor’s performance is poor, based on
agreed targets for performance and continuous improvement.  
e) to increase the requirement for the Bidder to demonstrate value for money over the
contract term for non-exclusive work; and
In addition to the provisions described in paras 2.86(b) and 2.86(d) the contractor
is contractually obliged to provide an annual report to the council, part of which
requires the contractor to demonstrate that Best Value has been achieved in the
delivery of the in-scope services. 
Contract provisions set out the requirements for future benchmarking and market
testing.
f) prescribe the procurement policy terms for advertising, quotations, and
subcontracting.
Contract provisions set out the requirements in relation to sub-contracting,
advertising, quotations for non-exclusive works, elements of narrative orders and
general requirement for a fair and transparent procurement process.
Best Value conclusion
2.87 The contract has been assessed on the basis of the Most Economically Advantageous
Tender (MEAT) with price having 40% of the total score.  The price / quality ratio was
determined by reference to Scottish Government procurement journey guidance where
the contract was classified as a “strategic” contract.  The Preferred Bidders
achievement of a 42.35% quality score, see para 2.61, also supports the positive
assessment of Best Value. 
2.88 The council is under a general duty of Best Value to “make arrangements to secure
continuous improvement in the way in which its functions are exercised, having regard
to a combination of economy, efficiency and effectiveness.” In addition, Audit Scotland
has updated its approach to Best Value in October 2023 which will be reflected in its
future audits of the Council – “it is about ensuring that there is good governance and
effective management of resources, with a focus on improvement, to deliver the best
possible outcomes for the public”.
2.89 The collective outcome of the actions set out in paras 2.86(a–f), together with; 
• consideration of the financial implications detailed at paras 2.49 to 2.52; 
• the contractor’s quality submission, set out at para 2.61; 
• the contractors social value commitments, set out at para 2.72;
• the benefits that the proposed contract, properly managed, will provide at para 2.74;
• the provisions in the proposed contract to drive continuous improvement; and 
• the wider economic benefits, the ‘multiplier impact’, for the local area, set out at
para 2.57.
has led us to conclude that the award of the proposed contract represents Best Value.
2.90 The assessment of Best Value is expected to continue throughout the contract term. 
The contract has been set up with sufficient flexibility to drive long term continuous
improvement with contractual provisions for collaboration, meeting community needs
Page 53 of 86

Page 54

through social value delivery, transparency, benchmarking, innovation, and efficiency
in directly delivered and subcontracted services embedded in the terms of the proposed
contract.
Next steps
2.91 Subject to approval of the recommendations in this report, the council will complete the
necessary documentation to allow the immediate award of the contract to the Preferred
Bidder. 
2.92 For a contract award of this nature and value the observation of 10-day standstill period
would normally be required under the Regulations, however as there is only a single
bidder, the council is not required to observe a standstill period.
2.93 Award of the contract will allow the commencement of a short mobilisation period. A
mobilisation plan has been developed with the Chief Officer Housing and Property
Services overseeing delivery of the plan. The mobilisation period will consist of
activities such as preparation for delivering gas servicing within the new contract;
integration of business systems; agreement of first year statutory compliance and
planned preventative maintenance plan; year one service delivery plan; developing
additional performance reporting; stakeholder communications and engagement plan;
and process and procedure implementation. 
2.94 The mobilisation plan will allow the agreed ‘day one’ services to commence on 1 July
2024 (targeted), with the remaining services commencing thereafter on a phased basis
in accordance with the agreed service transition plan.
Risks and practical considerations 
2.95 Members will recall that the report to the meeting of the Council on 17 August 2023
detailed the outcome of the ‘options revalidation exercise’ and importantly the
comparative associated risks and practical considerations of the two top scoring
service delivery options identified from the revalidation exercise: 
• proceeding with the award of the proposed contract (the highest scoring option);
and
• the creation of a council owned ALEO with elements of insource and outsource
delivery. 
2.96 The August 2023 report comprehensively set out the comparative associated risks and
practical considerations of both options, these included;
• gaps in service provision (some of which are legislative in nature);
• mobilisation and transition;
• operational management; 
• supporting technology and operational applications;
• assets and equipment;
• procurement;
• pension arrangements and costs;
• staffing, recruitment and retention;
• salaries, employment terms and benefits; and
• internal management/governance arrangements. 
Page 54 of 86

Page 55

2.97 The August 2023 report concluded that whilst there are risks associated with both
delivery options, the ALEO option has a number of significant additional unknowns and
comparatively greater risk in terms of transition and delivery costs and in potential risk
to continuity of service delivery. 
2.98 The Council agreed that following the outcome of the options revalidation exercise,
along with the practical considerations and associated risks, “continuing with the
current procurement exercise”, was the delivery option that would best meet the project
objectives.
2.99 The risks set out in the August 2023 report remain present and should be given due
weighting in considering the recommendation to award the proposed contract.
3. Measures of success 
3.1 The measures of success remain as previously reported to the Committee on 19 March
2020, namely that the Enterprise Project will help the council to: 
• shape North Lanarkshire;
• enhance our economy;
• regenerate our communities;
• provide cohesive maintenance and repairs;
• focus on whole life investment;
• achieve more efficient and effective delivery;
• move towards more sustainable and carbon neutral communities; and
• provide access to additional resources. 
3.2 The delivery model will continue to support twenty of the twenty five ambition
statements, being a key driver for nine of these ambition statements (2, 3, 5, 6, 17,
21, 22, 24, 25) and contributing to eleven other ambition statements (1, 4, 10, 11, 12,
14, 15, 16, 18, 19, 23) and will be a catalyst for the successful delivery of the Plan for
North Lanarkshire and its key priorities. 
4. Supporting documentation 
Appendix 1 – Summary of procurement process   
Appendix 2 – SME status and location of Tenderer(s) 
Appendix 3 – Scope of services   
Appendix 4 – List of new services / current contractors    
Appendix 5 – Selection stage outcome  
Appendix 6 – Award criteria     
Appendix 7 – Initial Tender outcome   
Appendix 8 – Final Tender outcome - qualitative criteria   
Appendix 9 – Social value commitments  
Appendix 10 – Contractual benefits   
Appendix 11 – Benchmarking     
Page 55 of 86

Page 56

Appendix 12 – External advisors fees   
James McKinstry
Chief Officer – Assets and Procurement 
Brian Lafferty
Chief Officer – Housing Property Services 
Stephen Llewellyn
Chief Officer – Housing Management 
Page 56 of 86

Page 57

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The Enterprise Project aims to create, through the council’s strategic contractual 
relationships with contractors, social value at scale for local communities. This
will help the council to meet the requirements of the Fairer Scotland Duty to reduce 
socio disadvantage. 
Socio economic impact is at the heart of the Enterprise Project and related contracts.
The Enterprise Project will deliver a range of socio-economic benefits for the local
community at a scale that cannot be achieved from current procurement and contract
management practices. Targeted social value benefits will include; 
• Employment Education & Skills - generate employment and training
opportunities for school leavers, apprentices and unemployed people;
• Supply Chain Development & Opportunities - use small and medium sized
enterprises (preferably local). Social enterprise or a supported business in supply
chain;
• Community Engagement & Capacity Building – to benefit local communities;
• Environment - implement cardon reduction and sustainability initiatives; and
• Innovation - introduce innovation in delivery of services (e.g., digital tools,
automation, working practices).
A single co-ordinated framework for delivering, measuring, and reporting socio
economic impact across all Enterprise Project related contracts will be developed
and implemented, this framework will be scalable for use across the wider
organisation.  
The council incorporates the statutory guidance on addressing ‘Fair Work Practices’
including payment of the Living Wage in all significant procurements 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Finance has been engaged with the Enterprise Project since its inception and is
represented on the Project Board and the supporting professional advisors group. 
The financial implications are set out at paras 2.49 to 2.52 of this report. 
Page 57 of 86

Page 58

Contract expenditure will be managed from current General Fund and Housing
Revenue Account budgets for repairs, maintenance and, where relevant, capital
expenditure. Future costs will be incorporated into medium term financial planning
processes considering contract inflation and thereafter considered as part of the
Council’s normal budget setting processes.   
Given the potential scale, complexity and importance of this project in helping to
realise the ambitions for North Lanarkshire, the Policy and Strategy Committee
meeting in February 2019 agreed that to supplement inhouse capacity and
capability, the procurement of appropriate specialist advice to support the
procurement exercise be authorised. 
External advisors’ fees, for all aspects of Enterprise Project (including the linked
predecessor project, the Enterprise Strategic Commercial Partnership) total
£4.284m (as of April 2024). The external advisors’ fees equate to 0.20% of the
combined total upper estimated contract value of the two phase one Enterprise
Project procurements. Professional advisors’ fees typically equate to around 10%
of the total cost of a project. 
Advisors’ fees paid remain within estimates, fees have been incurred in
accordance with internal procedures including committee approval/noting of
contract awards. 
Appendix 12 provides further details of external advisors’ fees. 
External advisors are managed by the Project Team, with regular reports provided
to the Project Board. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
People Resources has been engaged with the Enterprise Project since its inception
to ensure any and all HR considerations are addressed. 
HR is represented on the Project Board and the supporting professional advisors’
group. 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Legal and Democratic service has been fully involved with the Enterprise
Project since its inception and has sought advice from external legal advisors to
ensure the council manages legal risks effectively.
Page 58 of 86

Page 59

Legal and Democratic is represented on the Project Board and the supporting
professional advisors’ group. 
Legal advice has been and will continue to be sought to ensure compliance with
applicable legislation and to ensure the council manages legal risks effectively.
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☒
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The project includes securing efficiencies through further digitising aspects of
information exchange and ways of working. 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☒ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Enterprise Project aims to develop an innovative new approach to delivery for
a full range of interconnected property, community asset and infrastructure
investments. As such, will help the council to create more attractive town centres,
address areas of poor quality in the built environment, and encourage town centre
living through greening and improved community assets. Added to this, the
reshaping of North Lanarkshire’s town centres will aim to incorporate more energy
efficient housing and infrastructure and promote active travel and the use of public
transport via the development of transport hubs / interchanges, to support future
council targets for net zero emissions. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Page 59 of 86

Page 60

Regular updates relating to the Enterprise Project have been provided in line with
the agreed project communication plan, this will continue as the project progresses,
through contract award, contract mobilisation and ongoing contract management
phases. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Associated risks for the Enterprise Project are identified and managed in
accordance with the agreed corporate project risk management methodology and
monitored and reported via the Project Team and/or Project Board with risk
escalation as required. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
The Preferred Bidder has made a commitment to diversifying its workforce through
initiatives such as “Tradeswomen into Maintenance”, and the “Armed Forces
Covenant”.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒ 
Page 60 of 86

Page 61

Appendix 1 – Summary of procurement process 
CPT contract reference
allocated: NLC-SLP-22-003
Procurement procedure
utilised: Competitive Procedure with Negotiation
Governing legislation /
regulations: Public Contracts (Scotland) Regulations 2015
Date contract strategy
approved: 20 June 2022
Date contract notice published: 21 June 2022
Tender platform utilised: PCS-Tender (PCST)
Total expressions of interest
received: 22
NLC based expressions of
interest: 6
Selection Stage Submission
return deadline: 12 August 2022
Number of Selection Stage
Submissions received: 1
Selection Stage Submission’s
from SME’s: Nil
Selection Stage Submission’s
from NLC based Candidates: 1
Selection Stage Submission’s
from supported businesses: Nil
Number of non−compliant
Selection Stage Submission’s: Nil
Number of compliant Selection
Stage Submission’s: 1
Number of Candidates invited
to Negotiation Stage: 1
Negotiation Stage
commencement date: 05 September 2023
Negotiation Stage conclusion
date: 30 October 2023
Final Tender Stage publication
date: 30 October 2023
Final Tender Stage return
deadline: 20 November 2023
Number of Tenders received: 1
Page 61 of 86

Page 62

Tenders from SME’s: Nil
Tenders from NLC based
tenderers: 
1 (Operational headquarters and depots) 
Tenders from supported
businesses:
Nil 
Number of non−compliant
tenders: Nil
Number of compliant tenders: 1
Number of recommended
tenderers: 1
Basis of Award: Quality: 60% Price: 40%
Evaluation Team: Combination of Council Officers across Enterprise &
Communities.
Anticipated Start Date of the
Agreement: 01 July 2024
Total Agreement Period
(Months): 144 (includes available extension options)
Awarded Value of the
Agreement: Up to £1.8bn 
Page 62 of 86

Page 63

Appendix 2 – SME status and location of Bidders 
Name of Bidder
Size of Bidding
Organisation
(Micro, Small,
Medium or Large)
Location of Bidder
(Local Authority /
Council Area)
Mears Ltd Large
North Lanarkshire 
(Operational
headquarters and
depots) 
Page 63 of 86

Page 64

Appendix 3 - Housing & Corporate Maintenance & Investment Services - Scope 
Housing & Corporate: Summary Table 
Category Reference Level 1 Category 
Housing  Corporate 
A B C D A B C D
1 Adaptation Trades        
2 Bathroom Replacements        
3 Brickwork        
4 Car Park Access Control
Equipment        
5 Carpentry and Joinery        
6 CCTV        
7 Cleaning and Clearance        
8 Communal Boilers        
9 Communal TV Aerial and Satellite
Systems        
10 Controlled Door Entry        
11 Disabled Adaptations and Minor
Works        
12 Drainage        
13 Electrical        
14 Electrical Work        
15 Energy Efficiency Appliances and
Components        
16 Excluded Works        
17 Fencing and Gates        
18 Fire Safety Works        
Page 64 of 86

Page 65

19 Fire Stopping        
20 Foundations        
21 Glazing        
22 Groundworks        
23 Heating        
24 Heating, Gas Appliances and
Installations        
25 Homelessness & Temporary
Accommodation Services        
26 Intruder Alarms        
27 Kitchen Replacements        
28 Lead Pipe        
29 Lift Installations        
30 Lightning Conductors        
31 Major Repairs        
32 Masonry        
33 Mechanical Services        
34 Miscellaneous Communal M&E        
35 Painting and Decorating        
36 Plasterwork and Other Finishes        
37 Plumbing        
38 Roller Shutter Installations        
39 Roofing        
40 Specialist Services        
41 Specialist Treatments        
42 Structural Repairs        
43 Swimming Pool Maintenance        
44 Tower Services        
45 Tower Strategy        
46 Ventilation Installations        
47 Voids        
Page 65 of 86

Page 66

48 Wall and Floor Tile and Sheet
Finishes        
49 Warden and Other Alarm Call
Installations        
50 Windows & Doors Replacements         
Key Activity
A Reactive Maintenance
B Servicing & Inspections
C Investment Projects & Programmes
D Other Related Work 
Page 66 of 86

Page 67

Appendix 4 – New services 
Core Services 
Service Description Estimated
Annual Value
Bidder's
Indicative
Delivery Method
Strategic Partnership Contract: Housing & Non-
Housing Property Maintenance  £35,000,000 Self-deliver
majority of works
Strategic Partnership Contract: Central Heating
Maintenance £11,000,000 Subcontract
UPVC Door and Window Repairs and Maintenance  £1,875,000 Self-deliver
Bitmac Repairs  £1,675,000 Subcontract
Floor Coverings  £1,075,000 Subcontract
Water Quality Testing and Lead Mains Replacement  £950,000 Subcontract
Asbestos Removal & Encapsulation Services for
Domestic & Non-Domestic Property £775,000 Subcontract
CCTV / Intruder Alarms / Access Control Systems,
Service and Maintenance £550,000  Subcontract
Biomass Heating System Services and Supplies  £350,000 Subcontract
Controlled Door Entry Systems and Associated
Works – Repairs and Servicing £350,000 Subcontract/Self-
deliver
Metal Doors and Blacksmith Works: Service and
Maintenance £325,000 Subcontract/Self-
Deliver
Asbestos Surveying to Domestic and Asbestos Air
Monitoring, Sampling and Surveying to Non-
Domestic Properties 
£300,000 Subcontract 
Repairs to TV Aerials £180,000 Subcontract
Page 67 of 86

Page 68

Water Quality Control (Corporate Property)  £150,000 Subcontract
Air Conditioning Systems, Service, Maintenance,
Repairs & Installations £115,000 Subcontract
Warden Calls at Sheltered Housing Complexes  £100,000  Subcontract
Asbestos Air Monitoring, Sampling and Analysis to
Domestic Properties  £95,000 Subcontract
Building Energy Management System (BEMS)
Servicing & Maintenance £90,000  Subcontract
Water Quality Control (Risk Assessment, Monitoring
Regime and Associated Remedial Works)  £85,000  Subcontract
Electric Storage/Fan Convector Heaters - Servicing,
Maintenance, Repairs and Replacement £70,000 Subcontract
Swimming Pool Plant Inspection & Maintenance £44,000 Subcontract
Fire Alarm, Smoke Alarm and Protection Systems
Servicing and Maintenance  £43,750 Subcontract
Combined Heat and Power plant  - Ravenscraig £25,000  Subcontract
Combined Heat and Power  Unit - Time Capsule £25,000 Subcontract
Ice Rink - Time Capsule Repairs and Maintenance  £25,000  Subcontract
Temporary Heating & Portable Air Conditioning
Appliances & Dehumidifiers £25,000  Subcontract
Dehumidification Unit at Time Capsule - Repairs and
Maintenance £15,000 Subcontract
ETFE Roofing System Inspection, Cleaning,
Maintenance and Repairs £15,000 Subcontract
Page 68 of 86

Page 69

High Level Masonry: Inspection & Repairs  £15,000 Subcontract
Instantaneous Hot Water Boilers Repairs and
Maintenance  £15,000 Subcontract
Lightning Conductors: Inspection, Testing &
Maintenance  £15,000 Subcontract
Roof Anchors, Structural Anchorage & Safety Lines
Systems: Inspection, Testing & Maintenance  £15,000 Subcontract
Sound Equipment - Various - Repairs and
Maintenance £12,500  Subcontract
Sprinkler Servicing  £12,500 Subcontract
Smoke Control (Ravenscraig)  £10,000 Subcontract
Public Clocks Maintenance £8,000 Subcontract
Gas Detection & Monitoring System; Inspection,
Testing & Servicing £5,500  Subcontract
Bleacher Seating Servicing £5,000  Subcontract
Flume Servicing - various - Repairs and
Maintenance £5,000  Subcontract
Pool Covers Repairs and Maintenance £2,500  Subcontract
Backup Generator - Broadwood £1,500  Subcontract
Chlorine Detection Service & Calibration £1,500  Subcontract
Emergency Escape Breathing Apparatus
Maintenance £1,500 Subcontract
Page 69 of 86

Page 70

Repairs and Maintenance of Disability Pool Hoists £1,500 Subcontract 
New Services – Core Projects 
Service Description Estimated
Annual Value
Bidder's
Indicative
Delivery Method
Re-Roofing, Re-Rendering and Insulation Works £12,000,000 Subcontract
Windows & Doors Replacement £10,000,000 Subcontract /
Self-deliver
Gas Heating System Replacements  £6,000,000 Subcontract
Heating Systems (Gas, Renewable and Electric) -
Full Replacement £800,000 Subcontract
Controlled Door Entry Systems and Associated
Works Replacements £500,000 Subcontract /
Self-deliver 
Page 70 of 86

Page 71

Appendix 5 – Selection stage outcome summary 
Stage Criteria MEARS Limited
Result
1G1 Receipt and Collation of SPD Submissions Pass
2A1 Compliance and Completeness Check Pass
2A2 Information about the Bidder Check Pass
3B1 Exclusion Grounds (Mandatory) Pass
3B2 Exclusion Grounds (Discretionary)  Pass
3B3 Concluding Statement Check Pass
4C1 Economic and Financial Standing (4B.4) Pass
4C2 Economic and Financial Standing (4B.5.1, 5.2) Pass
4C3 Economic and Financial Standing (4B.6) Pass
5D1 4D.1 and 4D.2 Pass
5D2 4C.2, 4C.4, 4C.7, 4C.8.1, 4C.8.2, 4C.9 Pass
5D3 4C.1.2 3.1
5D4 Candidate Shortlisting Rank 1 
Shortlist Yes 
Page 71 of 86

Page 72

Appendix 6 – Award criteria 
Level 1
Award Criteria
Level 1
Award Criteria
Weighting
Level 2
Award Criteria
Level 2
Award Criteria Weighting
Quality 60%
1. Service Delivery 50%
2. Social Value 30%
3. Commercial 10%
4. Legal 10%
Price 40% 1. Price 100% 
Level 2 
Award Criteria
Level 2 
Award
Criteria 
Weighting
Level 3
Award Criteria
Level 3
Award Criteria 
Weighting
1. Service Delivery 50%
1.1 Contract Management  10%
1.2 Delivery approach and Methodology 40%
1.3 Staffing proposals (including fair work
practices) 10%
1.4 Subcontracting / supply chain proposals 10%
1.5 Mobilisation Plan / Service Implementation
Plan 10%
1.6 ICT Arrangements 5%
1.7 Management systems / service plans 5%
1.8 Service continuity proposals 5%
1.9 Exit plan proposals 5%
2. Social Value 30%
2.1 Employment, education and skills 30%
2.2 Supply Chain Development and
opportunities 15%
2.3 Community Engagement and Capacity
Building 15%
2.4 Environment 30%
2.5 Innovation  10%
3. Commercial 10% 3.1 Commercial 100%
4. Legal  10% 4.1 Legal 100% 
Page 72 of 86

Page 73

Level 4 
Criteria
Level 4 
"Question
Weighting"
1.1 Please provide a Governance & Contract Management Plan detailing how you
will support the governance & management of the Services.  100%
1.2a Please provide a Housing - Core Services - Reactive Maintenance Plan detailing
how you will deliver these Services.   20%
1.2b Please provide a Corporate - Core Services - Reactive Maintenance Plan
detailing how you will deliver these Services.   20%
1.2c Please provide a Housing - Core Services - Compliance, Servicing & Inspection
(including Gas) Plan detailing how you will deliver these Services.   20%
1.2d Please provide a Corporate - Core Services - Compliance, Servicing &
Inspections Plan detailing how you will deliver these Services.   20%
1.2e Please provide a Core Projects (Housing & Corporate) Plan detailing how you
will deliver these Services.   20%
1.3a Please provide a Resources Plan (Part A) detailing how you will successfully
resource & deliver the Services.  60%
1.3b Please provide a Resources Plan (Part B) detailing how you will successfully
resource & deliver the Services where directly employed workers are used.  40%
1.4a Please provide a Supply Chain Plan detailing how you will fairly select, manage
& pay Suppliers & Sub-Contractors.  60%
1.4b Please provide a Fair Work Plan detailing how you will comply with Fair Work
First principles where subcontracted workers are used.  40%
1.5a Please provide a Mobilisation Plan detailing how you will mobilise the Services. 50%
1.5b Please provide a Core Services Service Implementation Plan detailing how you
will transition services from existing contracts into the Contract.  25%
1.5c Please provide a Core Projects Service Implementation Plan detailing how you
will transition services from existing contracts into the Agreement.  25%
1.6 Please provide a Technology Plan detailing how you will use IT & technology to
robustly & reliably support the delivery of the Agreement.  100%
1.7a Please provide a Health & Safety Plan detailing your management arrangements
for the health, safety & wellbeing of the workforce, client & service users.  33.33%
1.7b Please provide a Quality Management Systems Plan detailing your management
systems for managing quality.  33.33%
1.7c Please provide an Environmental Management System Plan detailing your
management systems for managing environmental impact.  33.34%
1.8 Please provide your Service Continuity Plan detailing how you will maintain
continuity of service delivery. 100%
Page 73 of 86

Page 74

1.9 Please provide a Service Exit Plan detailing how you will manage the handover
of services & supporting information to the Authority.  100%
2.1 Please provide a Social Value Plan detailing how you will deliver specific &
tangible Social Value measures & benefits that you will offer the Authority.  100%
2.2 Please provide a Local Supply Chain Development Plan detailing how you will
deliver support local supply chain participation in the Agreement.  100%
2.3 Please provide a Local Community Engagement & Capacity Building Plan
detailing how you will support local community engagement over the Term.  100%
2.4 Please provide an Environmental Impact Reduction Plan detailing how you will
reduce environmental impact over the Term.  100%
2.5 Please provide an Innovation & Improvement Plan for delivery of innovation, new
technologies & new methods of service delivery.  100%
o Please provide a Commercial Plan describing your commercial management
approach to the Agreement.  80%
o Please provide a Pensions Plan describing your approach to pension
arrangements for the Agreement.  20%
4.1 Legal 100% 
Page 74 of 86

Page 75

Appendix 7 - Initial Tender review outcome summary – qualitative criteria 
Reference  Summary Agreed Consensus Score
1.1 Governance and Contract
Management Plan Meets the minimum requirement
1.2a Housing - Reactive Maintenance
Plan Meets the minimum requirement
1.2b Corporate - Reactive Maintenance
Plan Meets the minimum requirement
1.2c
Housing - Compliance, Servicing
& Inspections (including Gas)
Plan
Does not yet meet the minimum
requirement
1.2d Corporate - Compliance,
Servicing & Inspections Plan
Does not yet meet the minimum
requirement
1.2e Core Projects (Housing &
Corporate) Plan  Meets the minimum requirement
1.3a Resources Plan (Part A)  Meets the minimum requirement
1.3b Resources Plan (Part B)  Meets the minimum requirement
1.4a Supply Chain Plan Meets the minimum requirement
1.4b Fair Work Plan Meets the minimum requirement
1.5a Mobilisation Plan Meets the minimum requirement
1.5b Core Services Service
Implementation Plan
Does not yet meet the minimum
requirement
1.5c Core Projects Service
Implementation Plan
Does not yet meet the minimum
requirement
1.6 Technology Plan Meets the minimum requirement
1.7a Health and Safety Plan Meets the minimum requirement
1.7b Quality Management Systems
Plan Meets the minimum requirement
1.7c Environmental Management
System Plan Meets the minimum requirement
1.8 Service Continuity Plan Meets the minimum requirement
1.9 Service Exit Plan Meets the minimum requirement
2.1 Social Value Plan  Meets the minimum requirement
2.2 Local Supply Chain Development
Plan Meets the minimum requirement
Page 75 of 86

Page 76

2.3 Local Community Engagement
and Capacity Building Plan Meets the minimum requirement
2.4 Environmental Impact Reduction
Plan Meets the minimum requirement
2.5 Innovation and Improvement Plan Does not yet meet the minimum
requirement
3.1 Commercial Plan Does not yet meet the minimum
requirement
3.2 Pensions Plan Does not yet meet the minimum
requirement
4.1 Legal Not assessed at this stage   
Total number of criteria met  19 of 26 
Page 76 of 86

Page 77

Appendix 8 - Final Tender evaluation outcome summary – qualitative criteria 
Level 4 
Criteria
Maximum
Score
Available
Score
Achieved
1.2 Please provide a Governance & Contract Management Plan
detailing how you will support the governance & management of
the Services.   100 100
1.2a Please provide a Housing - Core Services - Reactive
Maintenance Plan detailing how you will deliver these Services.   100 75
1.2b Please provide a Corporate - Core Services - Reactive
Maintenance Plan detailing how you will deliver these Services.   100 75
1.2c Please provide a Housing - Core Services - Compliance, Servicin
& Inspections (including Gas) Plan detailing how you will delive
these Services.   100 75
1.2d Please provide a Corporate - Core Services - Compliance,
Servicing & Inspections Plan detailing how you will deliver these
Services.   100 75
1.2e Please provide a Core Projects (Housing & Corporate) Plan
detailing how you will deliver these Services.   100 50
1.3a Please provide a Resources Plan (Part A) detailing how you will
successfully resource & deliver the Services.  100 75
1.3b Please provide a Resources Plan (Part B) detailing how you will
successfully resource & deliver the Services where directly
employed workers are used.  100 75
1.4a Please provide a Supply Chain Plan detailing how you will fairly
select, manage & pay Suppliers & Sub-Contractors.  100 50
1.4b Please provide a Fair Work Plan detailing how you will comply
with Fair Work First principles where subcontracted workers are
used.  100 75
1.5a Please provide a Mobilisation Plan detailing how you will mobilise
the Services.  100 75
1.5b Please provide a Core Services Service Implementation Plan
detailing how you will transition services from existing contracts
into the Contract.  100 75
1.5c Please provide a Core Projects Service Implementation Plan
detailing how you will transition services from existing contracts
into the Agreement.  100 75
1.6 Please provide a Technology Plan detailing how you will use IT
& technology to robustly & reliably support the delivery of the
Agreement.
100 75
Page 77 of 86

Page 78

1.7a Please provide a Health & Safety Plan detailing your
management arrangements for the health, safety & wellbeing of
the workforce, client & service users.  100 100
1.7b Please provide a Quality Management Systems Plan detailing
your management systems for managing quality.  100 50
1.7c Please provide an Environmental Management System Plan
detailing your management systems for managing environmental
impact.  100 100
1.8 Please provide your Service Continuity Plan detailing how you
will maintain continuity of service delivery.  100 75
1.9 Please provide a Service Exit Plan detailing how you will manage
the handover of services & supporting information to the
Authority.  100 75
2.1 Please provide a Social Value Plan detailing how you will deliver
specific & tangible Social Value measures & benefits that you will
offer the Authority.  100 75
2.2 Please provide a Local Supply Chain Development Plan detailing
how you will deliver support local supply chain participation in the
Agreement.  100 100
2.3 Please provide a Local Community Engagement & Capacity
Building Plan detailing how you will support local community
engagement over the Term.  100 75
2.4 Please provide an Environmental Impact Reduction Plan
detailing how you will reduce environmental impact over the
Term.  100 75
2.5 Please provide an Innovation & Improvement Plan for delivery of
innovation, new technologies & new methods of service delivery.  100 50
3.3   Please provide a Commercial Plan describing your commercial
management approach to the Agreement.  100 50
3.4   Please provide a Pensions Plan describing your approach to
pension arrangements for the Agreement.  100 75
4.1 Legal 100 50   
Total number of criteria met  27 of 27 
Page 78 of 86

Page 79

Appendix 9 - Social value commitments
• creation of new jobs over the first three years of the contract, recruitment where
possible from the local area; 
• commitment to providing a significant craft and modern apprenticeship programme
over the duration of the contract; 
• scope for additional apprenticeships dependent on the extent to which the
contractor secures Core Projects; 
• further opportunities to increase the social value commitments to work placements
and apprenticeships through the supply chain through future subcontract
procurement processes;
• commitment to work placements working with local schools, colleges and
employability programmes and engaging with NL Education Future Friday strategy
to offer placements;
• continued commitment to employing locally and to employing locally first;
• continue to spend where possible with voluntary, community and social enterprises
through its supply chain;
• commitment to working with schools to promote construction as a positive work
destination and specifically at MEARS;
• offer knowledge and experience of developing training colleges to help the council
realise its ambition of creating its Construction Skills academy;
• investment in a local needs analysis report specific to North Lanarkshire in
partnership with independent expert organisation;
• annual assurance of its Social Value achievements by independent organisation; 
• all subcontracts to include commitments to social value and regular reporting,
proportionate to their scale;
• delivery of a bespoke Social Value training programme to all MEARS managers; 
• introduction of new apprenticeships to address the Climate Emergency;  
• commitment of funding to integrate the new services into their IT systems and
interfaces with the Council’s client management system;
• commitment to creation of an innovation fund;
• continued commitment to maintain a head office in North Lanarkshire with upgraded
accommodation;
• commitment to encouraging the participation of local SMEs to work with the Bidder;
• commitment to diversifying its workforce through initiatives such as “Tradeswomen
into Maintenance”, and the “Armed Forces Covenant”;
• commitment to an employee volunteering programme for a local charity or
community project;
• support and guidance for local businesses to participate and onboard to the
Preferred Bidders supply chain;
• ‘Meet the Buyer’ events and local engagement with businesses to advertise and
promote future subcontract opportunities through NL Business Gateway;
• commitment to working with social enterprises and supported businesses; 
• advertising of supply chain opportunities on Public Contracts Scotland portal (PCS);
• investment in subcontractor training and development e.g., Safety, Health &
Environment (SHE) Awareness courses, Customer Care induction;
• prompt payment of subcontractors within 30 day terms;
• sustainable procurement duty embedded into tender processes;
• commitment to fair work practices for its directly employed workforce and its supply
chain;
Page 79 of 86

Page 80

• all directly employed staff are paid in excess of Scottish Living Wage; and
• signatory to the Scottish Responsible Business Charter. 
Page 80 of 86

Page 81

Appendix 10 – Contractual benefits
Topic New Contract Provisions Benefits
Application of SOR Priced Schedules of Rates
(base rate) – Bidder to
provide its rate.
Comparison between Bidder’s
rates and Council’s rates.
Breakdown of SOR items –
labour, plant, materials,
management, profit.
• improved transparency of
application of SOR (including
labour, materials, plant,
management fee and profit).
• better information for
benchmarking. 
• improved transparency of
application of SOR for out of
hours, cost plus margins for
dayworks / narrative orders.  
• future proofing for use of
change mechanism.  
Benchmarking Market testing and
benchmarking based on CCS
Model Service Contract.
• improved value for money
provisions.
• industry standard provisions.
Best Value Efficiency
Saving
Replacement of existing
provisions with a service
credit model linked to KPIs.
• modernised, commercial
approach linked to contract
management.
Change Documented change process,
based on CCS Model Service
Contract.  
Process includes
consideration of impact of
proposed change on pricing.
• improved value for money
provisions.
• industry standard provisions.
Competitive Terms Contractor given
responsibility for
demonstrating value for
money.
• improved value for money
provisions. 
Data Protection Industry standard provisions
based on CCS Model Service
Contract.  
• modernised contract terms
aligned with legislation.
• improved commercial position
(cyber security).
Environment and
Sustainability 
Introduction of Environmental
Impact Reduction Plan to
capture and monitor Bidder’s
emissions over the contract
term.
• greater transparency.
• an environmental impact
reduction plan to capture and
monitor the contractor’s
commitments to emission
reductions over the contract
term (aligned to Scottish
Government climate
reduction measurement and
the council’s net zero
priorities to 2030 and beyond.
Exclusivity Exclusivity for Core Services,
no exclusivity for Core
Projects.
Non-exclusivity for Core
Projects with engagement
• guarantees that pricing for
Core projects will always
align with “on-market” pricing.
Page 81 of 86

Page 82

process to determine value
for money.
Exit Management  Comprehensive contractor
requirements for supporting
exit / transition to a new
contract.
• greater transparency.
• improved commercial
position.
Fair Work Practices Requirement to pay
subcontractors within 30
days.
Requirement to pay the living
wage.
• alignment with Scottish
Government Fair Work
guidance  
• improved value for money
provisions.
• opportunities for SMEs and
supply chain
Financial capacity  Introduction of monitoring and
escalation of potential
financial instability.
• greater transparency.
• improved value for money
provisions.
• improved commercial
position.
Freedom of
Information
Industry standard provisions
based on CCS Model Service
Contract.  
• aligns contract with
legislation. 
• modernised contract terms.
Indexation Building Cost Information
Service (BCIS) General
Building Cost Index
• no change – continuity of
indexation (no risk pricing). 
• Industry good practice.
Key Personnel Requirements for Contractor
to provide consistent quality
and qualification of key
personnel, notification of
change of key personnel.
• greater risk transfer to the
Contractor.
• improved commercial
position.
Method of
Measurement
Standard Method of
Measurement (SMM7),
moving to New Rules of
Measurement (NRM2) or
industry standard.
• opportunity for improvement
and modernisation over
contract the term.
Partnering principles Partnering approach
embedded into the contract. 
• aligns with industry good
practice.
• supports delivery of project
objectives
Performance
Indicators and
measurement
Comprehensive range of
performance measures (KPIs)
– compliance, reactive
maintenance, investment –
Housing and Corporate.
Introduction of commercial
consequences for failing to
meet milestones.
Link to service credit model.
• improved value for money
provisions.
• greater transparency of
performance reporting. 
Service Credit Model Financial deductions for
failure to meet KPIs.
• improved value for money
provisions.
Page 82 of 86

Page 83

• commercial consequences
for failing to meet
performance requirements.
• greater transparency of
performance reporting.
Service Scope and
Specifications
Comprehensive scope
documents – Core Services,
Core Projects.
Comprehensive suite of
specifications.
• updated specifications for
new standards, emerging
technology and legislation.
• greater transparency.
• audit trail / future proofing.
Social Value Requirement for Contractor to
meet commitments to Social
Value targets. 
• supports delivery of project
objectives.
• alignment with industry
standards (Themes,
Outcomes and Measures
framework).
Staff Transfers at
Commencement /
expiry 
TUPE and Pensions
Options for Contractor to
provide a Local Government
Pension Scheme or a Broadly
Comparable Scheme based
on standard industry practice.
• provisions aligned with
Scottish Government
statutory guidance on
pensions.
Subcontracting Requirement to advertise
subcontracting opportunities.
Support for participation of
SMEs.
Requirement for Fair Work
practices across the supply
chain. 
Provisions based on CCS
Model Service Contract.
• compliance with Scottish
Government guidance.
• improved transparency to
encourage participation by
local supply chain. 
• links to social value
commitments. 
Page 83 of 86

Page 84

Appendix 11- Benchmarking
Ref Potential Benchmarking
Comparator – Data Source
Potential
scope
Confidence
Rating
Outcome
1. APSE – Benchmarking exercise
March 2023 – comparison between
NLC and 4 other local authorities.
Core
Services
Medium  Generally
Favourable
2. NLC price validation exercise Core
Services
Medium  Generally
Unfavourable
3. National Housing Federation SOR
Benchmarking exercise
Core
Services
Medium  Mixed
4. National Schedule of Rates SOR –
Benchmarking Exercise
Core
Services
Low  Mixed
5. Scotland Excel – Property
Maintenance and refurbishment
framework
Daywork
percentage
additions
Labour hourly
rates
Low  Mixed
6. General market indicators – Turner
& Townsend Market Intelligence
Reports
Core
Services
Core Projects
Low  N/A
General
market
overview
only
7. Comparison to NLC Roads &
Infrastructure final tender
submissions
Management
fee
Profit
Medium Information
not available
in required
timeframe.
8. Crown Commercial – Housing
Maintenance and Repair Framework
– RM6241
Core
Services
Core Projects
N/A  No reference
points
identified 
9. Scottish Procurement Alliance (SPA)
- Frameworks
Core Projects N/A  No reference
points
identified.
.
10. SCAPE – Frameworks (Scotland) Core Projects N/A  No reference
points
identified 
11. Other similar Scottish organisations
with similar delivery model
Core
Services
Core Projects
N/A  No reference
points
identified 
Page 84 of 86

Page 85

Appendix 12- External Advisors fees 
Advisor Fee Total
Turner and Townsend £2,812,754
Pinsent Masons LLP £1,104,530
Grant Thornton UK LLP £233,314
Optimum Professional Solutions  £77,200
Harper Legal £32,250
Burness Paull LLP £24,000  
Total £4,284,048 