Democracy Spraffa

Agenda Document Pack - Council - 12/06/2025

North Lanarkshire Council · 12 June 2025
Back to Council — 12 June 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Clerk Name: Mark Hamill
Clerk Telephone: 07811294702
Clerk Email: committee@northlan.gov.uk
3 June 2025
Members of the
Council
Chief Executive’s Office
Rachel Blair
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk
Notice is given that a Special Meeting of the Council is to be held in the Council Chamber,
Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on Thursday, 12 June 2025 at 11:30
AM or immediately following the conclusion of the Planning Hearings Committee, which you
are requested to attend.
The agenda of business is attached.
Des Murray
Chief Executive
Members :
D Ashraf, A Ballinger, C Barclay, B Baudo, A Beveridge, M Boyd, H Brannan-McVey, G
Brennan, B Burgess, A Bustard, J Cairns, A Campbell, T Carragher, C Costello, M Coyle, S
Coyle, D Crichton, G Currie, P Di Mascio, K Docherty, K Duffy, A Duffy-Lawson, H Dunbar,
T Fisher, F Fotheringham, W Goldie, H Gray, K Harmon, M Hughes, J Hume, L Jarvie, D
Johnston, T Johnston, J Jones, P Kelly, J Keltie, A Khan, K Larson, J Leckie, G Lennon, J
Logue, H Loughran, F MacGregor, A Masterton, M McBride, B McCluskey, A McCrory, B
McCulloch, M McCulloch, P McDade, F McKay, R McKendrick, J McLaren, C McManus, M
McPake, J McPhilemy, A McVey, L Mitchell, L Nolan, P Patton, C Quigley, J Reddin, L
Roarty, D Robb, G Robinson, N Shevlin, W Shields, A Smith, A Stubbs, L Stubbs, R
Sullivan, A Thomas, J Toner, S Watson, C Williams, N Wilson, G Woods.
Page 1 of 90

Page 2

Page 2 of 90

Page 3

Agenda
1 Declarations of Interest In Terms of the Ethical Standards
In Public Life Etc. (Scotland) Act 2000
2 Planning Application 18/00890/PPP - Proposed
Residential-led Mixed Use Development  Masterplan,
including Residential (Mixed  Types/Tenures),
Employment Facilities, Local  Neighbourhood Centre
(Potentially Including  Retail, Food and Drink Uses,
Public House, Leisure Uses, Healthcare, Community
Facilities), Education Facilities, Energy Centre, Parkland,
Open Space  and Landscaping, with Associated Access
Roads,  Parking and Infrastructure -
Land to North of A8 and South of Sykeside Road and
Calderbank Road, Airdrie
Submit report by the Chief Officer (Place) on an application
for planning permission by Orchard Brae Ltd.
5 - 90
Page 3 of 90

Page 4

Page 4 of 90

Page 5

Application No:  
18/00890/PPP
Proposed Development: 
Proposed Residential-led Mixed Use Development Masterplan,
including Residential (Mixed Types/Tenures), Employment
Facilities, Local Neighbourhood Centre (Potentially Including
Retail, Food and Drink Uses, Public House, Leisure Uses,
Healthcare, Community Facilities), Education Facilities, Energy
Centre, Parkland, Open Space and Landscaping, with
Associated Access Roads, Parking and Infrastructure. 
Site Address: 
Land to North of A8 and South of
Sykeside Road and Calderbank Road,
Airdrie 
Date Registered:
13th June 2018 
Applicant:
Orchard Brae Ltd.
1 George Square
Glasgow
Scotland
G2 1AL 
Agent:
Stantec
5th Floor
9 George Square
Glasgow
G2 1DT 
Application Level:
Major Application  
Contrary to Development Plan:
Yes
Ward:   
12 Airdrie South: 
Councillors Michael Joseph Coyle, Paul Di
Mascio, Michael McBride, Sandy Watson
Representations:
2099 representations received.   
Recommendation: Refuse 
Reasoned Justification: 
The proposal is contrary to National Planning Framework 4 and to the North Lanarkshire Local
Development Plan 2022 and would represent a significant departure from the development
plan spatial strategy.  It is not considered that any material considerations have been
demonstrated which would justify the release of this site from the Green Belt for the proposed
purposes. 
Item 2
Page 5 of 90

Page 6

Reproduced by permission of
the Ordnance Survey on
behalf of HMSO. © Crown
Copyright and database right
2009.  All rights reserved.
Ordnance Survey Licence
number 100023396.
Planning Application: 18/00890/PPP 
Name (of applicant): Orchard Brae Ltd.
Site Address: Land to North of A8 & South of
Sykeside Road & Calderbank Road, Airdrie
Development: Residential-led Mixed Use
Development Masterplan including
Residential (Mixed Types/Tenures),
Employment Facilities, Local Neighbourhood
Centre (Potentially Including Retail, Food and
Drink Uses, Public House, Leisure Uses,
Healthcare, Community Facilities), Education
Facilities, Energy Centre, Parkland, Open
Space and Landscaping, with Associated
Access Roads, Parking and Infrastructure.   
Page 6 of 90

Page 7

Recommended Reasons for Refusal: - 
1. The proposal is contrary to National Planning Framework 4 Policy 8 (Green Belts) and to North
Lanarkshire Local Development Plan Policies PP 4 (Green Belt – Purpose of Place) and AD 4 (Green
Belt – Amount of Development) as the development would result in the loss of a valuable area of
Green Belt which strongly contributes to defining the settlements of Airdrie, Calderbank and
Coatbridge and to the landscape character and countryside recreational opportunities of the local
area.  The development of this site would significantly undermine the integrity and value of the
remainder of the Green Belt between the M8 and the Monklands settlements and result in urban
sprawl which would erode the identity of individual settlements.  It is not considered that any adequate
justification, special circumstances or material considerations have been demonstrated which would
justify a departure from these policies. 
2. The proposal is contrary to National Planning Framework 4 Policies 1 (Tackling the Climate and
Nature Crises), 9 (Brownfield, Vacant and Derelict Land and Empty Buildings) and 14 (Design, Quality
and Place) and to North Lanarkshire Local Development Plan Policy PROM LOC 1 (Regeneration
Priorities) as the development would involve the use of a large greenfield site for purposes which are
neither allocated for or explicitly supported by the development plan.  By developing this site, the
proposal would undermine the prospects of achieving regeneration of more sustainable brownfield
sites and promoting the physical regeneration of the existing urban area. It is not considered that any
adequate justification, special circumstances or material considerations have been demonstrated
which would justify a departure from these policies. 
3. The proposal is contrary to National Planning Framework 4 Policy 16 (Quality Homes) as the
residential part of the development does not satisfy the requirements of part (f) of the policy in respect
of the limited circumstances where new homes may be supported on land which is not allocated for
that purpose in the local development plan. It is not considered that any adequate justification, special
circumstances or material considerations have been demonstrated which would justify a departure
from this policy. 
4. The proposal is contrary to National Planning Framework 4 Policy 26 (Business and Industry) as the
industrial, storage and distribution part of the development does not satisfy the requirements of part
(a) of the policy in respect of the circumstances where such development may be supported on land
which is not allocated for that purpose in the local development plan. It is not considered that any
adequate justification, special circumstances or material considerations have been demonstrated
which would justify a departure from this policy. 
5. The proposal is contrary to National Planning Framework 4 Policies 27 (City, Town, Local and
Commercial Centres) and 28 (Retail) and to North Lanarkshire Local Development Plan Policy AD4
(Green Belt – Amount of Development) as the proposed local centre and other retail / food and drink /
service uses within the proposed industrial area would not accord with the Town Centres First
approach or satisfy the sequential approach to the location of such uses, and as the proposed
residential and industrial uses which these areas are intended to serve are themselves contrary to the
policies of the development plan the retail (etc.) uses cannot be justified as being ancillary to an
acceptable use. It is not considered that any adequate justification, special circumstances or material
considerations have been demonstrated which would justify a departure from these policies. 
6. The proposal is contrary to National Planning Framework 4 Policies 2 (Climate, Mitigation and
Adaptation), 13 (Sustainable Transport), 14 (Design, Quality and Place) and 15 (Local Living and 20
Minute Neighbourhoods) and to North Lanarkshire Local Development Plan Policies PROM ID 1
(Transport Improvements) and EDQ 3 (Quality of Development) as the development is poorly sited for
active travel and public transport, with a limited range of services and facilities within a convenient
walking distance of many parts of the site.  It is not considered that any adequate justification, special
circumstances or material considerations have been demonstrated which would justify a departure
from these policies. 
7. The proposal is contrary to National Planning Framework 4 Policy 7 (Historic Assets and Places) and
to North Lanarkshire Local Development Plan Policies PROT B (Historic Environment Assets) and
EDQ 3 (Quality of Development) as the development would detract from the setting of the Monkland
Page 7 of 90

Page 8

Canal and Woodhall House scheduled monuments and of High Palacecraig listed building. It is not
considered that any adequate justification, special circumstances or material considerations have
been demonstrated which would justify a departure from these policies. 
8. The proposal is contrary to National Planning Framework 4 Policy 20 (Blue and Green Infrastructure)
and to North Lanarkshire Local Development Plan Policies PROM LOC 4 (Special Landscape Areas
and Green Network Improvements) and PROT A (Natural Environment and Green Network Assets) as
the development would result in detrimental impacts upon a valuable area of the Glasgow and Clyde
Valley Green Network. The development as a whole is inconsistent with the wider policies of the
development plan and therefore its adverse impacts on the Glasgow and Clyde Valley Green Network
cannot be justified.  It is not considered that any adequate justification, special circumstances or
material considerations have been demonstrated which would justify a departure from these policies. 
Background Papers: 
Consultation Responses:
Coal Authority   response dated 28 June 2018
Historic Environment Scotland   response dated 27 March 2024
NatureScot   response dated 27 July 2018
NLC Archaeology Consultant   response dated 27 March 2024
NLC Education   response dated 30 January 2025
NLC Protective Services   response dated 12 July 2018
NLC Landscape   response dated 30 May 2019
NLC Infrastructure & Transportation  response dated 8 October 2024
Scottish Canals   response dated 24 October 2018
Scottish Forestry   response dated 6 December 2021
Scottish Gas Networks   response dated 19 March 2024
Scottish Environment Protection Agency  response dated 13 January 2025
Scottish Power Environmental Planning  response dated 1 November 2021
Scottish Water   response dated 4 April 2024
Strathclyde Partnership for Transport  response dated 26 Juny 2019
Transport Scotland   response dated 20 June 2024
Woodland Trust Scotland   response dated 3 May 2024   
Contact Information: 
Any person wishing to inspect these documents should contact Keith Bathgate at
planningenquiry@northlan.gov.uk 
Report Date: 
29 May 2025  
Page 8 of 90

Page 9

Executive Summary 
A. Background, Site & Proposals 
A.1 The application relates to 244-hectares of countryside situated between Airdrie, Calderbank,
and Carnbroe, and bounded to the south by the A8 / M8 road corridor.  It is currently agricultural
land interspersed with large areas of woodland and crossed by both the Monkland Canal and
the North Calder Water.  Heritage features on the site include the canal and the remains of
Woodhall House (scheduled monuments), and High Palacecraig House (‘B’ listed building). 
A.2 The application seeks planning permission in principle for a mixed use development of
residential, storage/distribution and industrial uses along with associated uses and
infrastructure. The proposed development would transform this countryside into a substantial
new urban quarter. The northern part of the site (on the southern edge of Airdrie) would
become a residential area containing up to 980 dwellings in a mix of housing types and
tenures, of which the applicant proposes to designate 20–25% as affordable housing.  Within
this area there would also be a new local centre (expected to contain local shops and
community facilities), and a new primary school campus.  The southern part of the site (to the
south and west of Calderbank) would be the employment area containing an estimated
84,540sq/m of storage and distribution space in two large units, 27,870sq/m of general
industrial floorspace in multiple smaller units, and a small amount of ancillary retail / food and
drink floorspace.  A new spine road would connect Sykeside Road in the north to Woodhall
Mill Road in the south, facilitating access to the site (and effectively serving as a bypass for
Calderbank).  A youth football academy is also proposed.  A large proportion of the site would
remain undeveloped, including most of the existing woodland and large areas where new
woodland planting is proposed.  The applicant proposes that the woodland and other public
greenspace become a community-owned country park. 
A.3 This planning application was originally submitted in 2018 and has been under consideration
for a considerable period due to the time taken to resolve technical consultations and
amendments to the proposal which necessitated further consultation and publicity.  The
proposal has changed significantly during the course of the application, and some of the
original proposals including a new connection to the Europark motorway junction have been
removed from the scheme. 
B Consultations 
B.1 Historic Environment Scotland (HES) has no objection to the proposal.  Whilst the proposal
would adversely affect the setting of Woodhall House, HES consider that this impact would not
be of national significance.  Locally significant heritage issues would be outwith HES’ remit
and are matters for the Council to consider. 
B.2 NatureScot has no objection to the proposal, subject to further surveys and mitigation which
could be addressed by conditions. 
B.3 NLC Education indicate that all of the local primary and secondary schools in this area have
existing capacity constraints and that additional capacity would be needed to accommodate
the development.  This would include the construction of a new primary and nursery campus
and a review of local catchment boundaries.  A developer contribution of £12,739,191 plus
land for a new education campus would be needed and this would require a planning
obligation.  As the site is not allocated for housing the council has not budgeted for the
construction of new schools, and these would need to be provided at a relatively early stage
in the development as existing schools are so close to capacity.  The location and size of the
new school campus would also require to be agreed as the location shown on the masterplan
is not optimal.
Page 9 of 90

Page 10

B.4 NLC Infrastructure and Transportation has no objection subject to conditions and a planning
obligation covering a range of matters.  In order to accommodate and mitigate the impacts of
the development off-site road improvement works would be required including the addition or
widening of footways on Paddock Street, Calderbank Road, Woodhall Mill Road and at
Eurocentral, and junction improvements at the Sykeside Road / B802 junction and within the
B802 / B799 / A8 / M8 junction complex.  The completion of the full spine road through the site
would need to be completed before more than 300 houses were occupied to avoid excess
traffic through Calderbank, and additional traffic surveys would be needed at that point to
confirm how it was impacting upon local traffic patterns.  The proposal is poorly connected to
public transport and the developer may need to subsidise a bus service to meet minimum
accessibility requirements. 
B.5 Strathclyde Partnership for Transport comment that the proposal did not appear to give
sufficient consideration to public transport and that if permission was granted a sustainable
travel strategy should be required.  These comments related to an earlier version of the
proposal but are still considered to be applicable. 
B.6 Transport Scotland has no objection subject to off-site road improvements corresponding with
some of those required by NLC Infrastructure and Transport and to technical conditions
relating to trunk roads matters. 
B.7 Woodland Trust Scotland objected to the application because of the loss and fragmentation of
ancient woodland.  However their comments related to an earlier version of the proposal and
it has since been amended to include much more new woodland planting, which would offset
the small amount of ancient woodland affected. 
B.8 The Mining Remediation Authority, NLC Archaeology, NLC Protective Services, Scottish
Canals, SEPA, Scottish Water, Scottish Gas Networks and SP Energy Networks all have no
objection to the proposal subject in some cases to conditions covering technical matters. 
C Representations 
C.1 Public consultation has generated substantial interest, with 3,625 total representations
received, although that number includes many multiple representations from the same
household, duplicates from people who have made more than one representation and invalid
representations from people who have failed to provide a complete name and address. 
Discounting those, there have been 2,029 objections, 66 expressions of support and 4 neutral
comments from the public and a range of organisations.  All material planning considerations
raised in representations have been taken into account in the report. 
C.2 Objections have been received from 2014 households or individuals, 6 current or former MPs
and MSPs, 2 local community councils (Cairnhill and Monkland Glen), and 7 other
organisations including the Association for the Protection of Rural Scotland, Ravenscraig Ltd.,
and the Woodhall, Faskine and Palacecraig Conservation Group.  Reasons for objection
include: the loss of an attractive and valued area of countryside; urban sprawl in the Green
Belt filling the space between settlements; urbanising an area which is well used for
countryside recreation; adverse impact on woodland and wildlife; impact on historic setting of
heritage assets and destruction of historic landscape; lack of need for development; additional
traffic and air pollution, noise and disturbance during construction and from traffic; and
development being inconsistent with policies and climate change commitments. 
C.3 Expressions of support have been received from 58 households or individuals, 2 community
councils from elsewhere in the Monklands (North Calder and Plains), and 6 other organisations
or companies including Calderbank Bowling Club, Gartcairn Football Academy and the
Page 10 of 90

Page 11

Scottish Junior Football Association).  Reasons for supporting the proposal include: the major
investment in the area; creation of jobs; provision of new road, school and other facilities; need
for more new houses including affordable homes; improvements to green space and provision
of a country park; provision of football academy; and sustenance of local businesses and
sports clubs through additional population. 
C.4 Four neutral comments (from two individuals, Scottish Badgers and an amusements business)
related to the phasing of community infrastructure, the desirability of a connection to the
Europark junction being reinstated, the need for updated badger surveys and the undesirability
of a cinema on the site (which is no longer proposed). 
D. Assessment Against Development Plan and Material Considerations 
D.1 Section 25 of the Town and Country Planning (Scotland) Act 1997 requires that planning
applications be determined in accordance with the policies of the development plan unless
material considerations indicate otherwise.  In this case the site is currently designated as
Green Belt, and the proposal would be significantly contrary to the development plan (which
consists of National Planning Framework 4 (NPF4) and the North Lanarkshire Local
Development Plan (NLLDP)). 
D.2 In particular, the proposed development is contrary to Green Belt policies (NPF4 Policy 8 and
NLLDP Policies AD 4 and PP 4).  These policies support development in the Green Belt only
under very specific circumstances, such as for agriculture, forestry, recreation, or essential
infrastructure.  The proposal does not fall into any of the allowable categories or
circumstances.  Furthermore, it is considered that the development would erode the physical
separation between Airdrie, Calderbank, and Carnbroe, undermining the identity and setting
of these communities. The proposal would therefore significantly compromise the integrity of
a valuable area of Green Belt along the M8 corridor, leading to further development pressure
on the remaining pockets of countryside in and around the site. 
D.3 The proposal is also inconsistent with NPF4 Policy 16, which governs the delivery of new
homes. The site is not allocated for housing in the local development plan, and the proposal
does not meet the limited exceptions under the policy. There is no demonstratable need for
large-scale additions to the housing land supply in North Lanarkshire, as the existing supply
already comfortably exceeds the Minimum All-Tenure Housing Land Requirement (MATHLR). 
The proposal does include a significant proportion of affordable housing, which is appropriate
for housing development but does not justify the release of Green Belt land. 
D.4 In terms of employment land, the proposal would provide two large storage and distribution
plots, and there is acknowledged to be a limited availability of allocated sites suitable for such
units.  However, the size, shape and levels of the proposed plots are not considered to be
optimal for this type of development and as the application is speculative it is not certain that
they would actually be developed in the manner suggested.  The applicant has not been able
to demonstrate that there are a lack of suitable alternative sites , as there are existing allocated
sites within the industrial land supply that could accommodate such uses, albeit that (like the
application site itself) these may be subject to constraints.   It is therefore considered that the
proposal does not satisfy the requirements of NPF4 Policy 26 (Business and Industry) in
respect of the development of unallocated land for such purposes. 
D.5 The proposal is also considered to be contrary to various other key policies. It does not align
with the principles of prioritising brownfield development and achieving compact urban growth. 
Allowing a large housing development and significant new industrial floorspace on what is
effectively a greenfield site without a clear need for additional land for these purposes would
undermine the prospects of securing the development of more appropriate sites, including the
Page 11 of 90

Page 12

regeneration of brownfield land within existing urban areas, and the proposal is therefore
contrary to NPF4 Policy 9 and NLLDP Policy PROM LOC 1. 
D.6 Whilst the site is located on the edge of a settlement the site is relatively distant from most
local services and facilities and it is considered that public transport access is poor.  On the
other hand it has excellent access to the major roads network, which would encourage car
use.  The applicant proposes to address this by providing a local centre and a new school
campus, which would reduce the need to travel somewhat, but overall for a development of
the scale proposed it is not regarded as being sufficiently accessible by sustainable means. 
Accordingly, the proposal is considered to be contrary to various NPF4 and NLLDP policies
which relate to sustainable travel, local living and greenhouse gas emissions. 
D.7 The site is currently an attractive area of countryside which is readily accessible to the local
population due to an existing footpath network including the well-used canal towpath.  This
landscape provides the setting for the historic environment features on the site, and parts of
the site comprise the surviving areas of the former Woodhall House designed landscape.  The
proposal would retain almost all of the existing woodland within this area and would plant a
large amount of new woodland, and it is proposed to designate the area as a country park
which would preserve public access.  Whilst the proposed masterplan is considered to be well
designed and potentially attractive in its own right, the development would irreversibly alter the
existing countryside character of the area and would result in the remnants of the designed
landscape no longer being legible.  It is therefore considered that the proposal would be
detrimental to the setting of historic environment assets and to the urban green network and
would therefore conflict with NPF4 and NLLDP policies applicable to those matters. 
D.8 The application is supported by an Environmental Impact Assessment (EIA) which identifies
several significant impacts. The most notable is the adverse effect on the landscape,
particularly the loss of open countryside and the remnants of the designed landscape
associated with Woodhall House. The development would also have locally significant adverse
impacts on the setting of the Monkland Canal, a scheduled monument, and High Palacecraig
House, a listed building. While the EIA concludes that many of these impacts would be
mitigated over time through landscaping and management, it is considered that the adverse
effects on landscape and heritage assets would be permanent and significant and it has not
been demonstrated that they can be justified. 
D.9 Ecological impacts are also assessed in the EIA. The site supports a range of habitats and
species, including ancient woodland, badgers, bats, and great crested newts. The proposal
includes mitigation measures such as habitat retention, new woodland planting, and ecological
management plans. While these measures would reduce the impact on biodiversity and result
in some habitat loss and fragmentation, this would be offset by the large amount of new
woodland planting which is proposed, and which is potentially of net ecological benefit. 
D.10 Socio-economic impacts are presented by the applicant as a key benefit of the proposal. The
applicant estimates that the development would create over 1,800 full-time equivalent jobs and
generate significant economic output. However, the assumptions underlying these estimates
are questioned and it is considered that the actual economic benefits are likely to be lower
than projected.  Similar benefits would arise if the employment development took place on
alternative, more sustainable, sites, which the proposal would potentially undermine.  The
proposal would generate temporary construction employment, but this would be similar to that
arising from development on allocated sites. 
D.11 The proposal would give rise to significant additional traffic, including heavy goods vehicle
movements between the proposed storage / distribution and industrial units and the M8
Chapelhall junction.  However, subject to a package of proposed mitigation and to further traffic
assessments at later stages in the development process, it is considered that these impacts
Page 12 of 90

Page 13

would be acceptable.  There would be a need for increased capacity at local primary and
secondary schools, and the provision of a primary school campus on the site would form part
of that mitigation.  These issues would require a planning obligation to secure developer
contributions and off-site work.  All other technical matters in this regard would be capable of
being addressed through conditions. 
D.12 The applicant acknowledges that the proposal is contrary to the Green Belt policies but argues
that the site does not satisfy the present requirements for being designated as Green Belt and
that it should instead be regarded as being within an urban area.  For that and other reasons
they do not consider the proposal to have any significant conflicts with other development plan
policies, and they consider that material considerations justify the departure from Green Belt
policy.  In particular, the applicant considers that there are shortfalls in housing and industrial
land supply which the proposal would address, that the proposal would have major economic
benefits (including the new jobs discussed above), that the proposal would improve the local
environment by providing a large amount of new landscaping and woodland planting with
improved maintenance of these areas, and that the creation of a country park, community
allotments and a football academy would be of benefit to the local community.  However, as
explained above it is considered that the site is an appropriate and valuable part of the Green
Belt, and the proposal is significantly contrary to its associated policies.  The material
considerations raised in favour of the proposal are not considered to be sufficient to justify this
major departure from the development plan, especially when the development also has
significant negative impacts and these are considered to outweigh any benefits. 
E Conclusion 
E.1 In conclusion, the proposed development is contrary to multiple policies of the development
plan and represents a significant departure from the established spatial strategy. It would result
in the unjustified loss of Green Belt land, significant adverse impacts on landscape and
heritage assets, the creation of an unduly car-dependent community and would undermine the
prospects of securing the development of more appropriate sites that are identified within the
development plan. While the proposal includes some benefits, these are not sufficient to
outweigh the policy conflicts and environmental harms. It is therefore recommended that
planning permission in principle be refused. 
E.2 Should the Council be minded to approve the application, it is recommended that permission
not be released until a legal agreement is concluded to secure developer contributions and
specify responsibilities in respect of education provision, road improvements, sustainable
transport infrastructure, public transport support, and the management of open space.
Page 13 of 90

Page 14

APPLICATION NO. 18/00890/PPP 
REPORT 
1. Purpose of Report 
1.1 To advise the Council of a planning application for a major development which would be
significantly contrary to the development plan, and which is therefore required to be determined
by the Full Council.   The Council is asked to determine the application, having regard to
evidence heard at the pre-determination hearing and to the contents of this report. 
2. Background 
2.1 This planning application was submitted in 2018, and the details of the proposal have evolved
over the years.  When originally submitted the application sought up to 2,600 houses / flats
and a larger mixed-use local / commercial centre, but during the course of the application the
number of dwellings has been reduced, the mixed-use centre has been reduced to a smaller
local centre and an industrial / storage and distribution area has been added.  The original
proposal had a larger development footprint that included development of the area immediately
north of Calderbank, and would have included new road connections from the site to the
Eurocentral A8/M8 roundabout (Junction 7) to the south and to Calderbank Road to the east,
but these have all since been deleted.  The amount of new woodland planting proposed has
also been increased.  These changes were made by the applicant in response to comments
from consultees and from the Planning Service, as well as to changes to the property market
over the last seven years. Updated supporting documents have been provided to reflect these
changes, as well as to respond to changes to local and national planning policies (including
the adoption of a new local development plan and of National Planning Framework 4 during
the application period). 
2.2 The application has therefore been subject to an extremely prolonged consideration period,
which was partly due to the complexity of technical consultations in respect of traffic impact. 
The proposal involves construction of a new road which would in effect form a bypass for
Calderbank, and as noted above earlier versions of the proposal also included a new direct
connection to M8 Junction 7 (since dropped).  Consequently there are implications for traffic
patterns in the surrounding area, and discussions with Transport Scotland and with the
Council’s Infrastructure and Transportation Service have been extensive.  Additional traffic
survey work was required, which was complicated by the Covid-19 pandemic, and as noted
above the applicant’s proposals for the site have also changed over time requiring revised
documents including an update to the Environmental Statement.  Three separate public
consultation periods were therefore required in 2018, 2021 and 2024.  However, there is now
sufficient information to allow determination of the application as it stands. 
2.3 Masterplan drawings have been provided showing the broad outline of the applicant’s
proposal, however in terms of detailed layouts and land uses the masterplan is indicative only. 
If permission in principle were to be granted, future applications for Approval of Matters
Specified in Conditions (AMSC) would be required in order to confirm the masterplan and allow
the consideration of fully detailed proposals for each development phase. 
3. Site Description 
3.1 The application relates to some 244 hectares (603 acres) of countryside at Faskine on the
southern edge of Airdrie.  Broadly, the application site is bordered by residential areas in
Airdrie (Sykeside Road and Calderbank Road) to the north, by the valley of the North Calder
Page 14 of 90

Page 15

Water (separating the site from housing at Carnbroe) to the west, by Calderbank Road and
housing in the village of Calderbank to the east, and by the A8 / M8 road corridor to the
south, with the Eurocentral / Maxim business park opposite.  Nearly all of the application site
is currently either agricultural fields, woodland or unused grassland, but it also contains an
active farmstead (Faskine Farm) and a large house (High Palacecraig).  Also within the site,
but excluded from the application boundary, are another eight individual houses at dispersed
locations.  The immediate neighbouring land is mainly countryside, roads or housing on the
edges of the aforementioned urban areas, but other neighbouring uses include a coach
depot, a courier firm and boarding kennels.  The North Calder Water and the Monkland
Canal both traverse the site from south-east to north-west, and there is also a small lake
(Lilly Pond) as well as various smaller burns and ponds.  The canal towpath along with
numerous other footpaths and privately maintained roads cross the site and are used for
recreational walking, some of these being designated as Core Paths.  Due to the very large
size of the site its ground levels are undulating, but in general it is lowest across the centre of
the site (i.e. the valley of the North Calder Water), with land rising gently to both the north
and south. 
3.2 Within the site there are various features of historic or natural interest.  Designated heritage
features comprise the Monkland Canal and the remains of Woodhall House (both scheduled
monuments) and High Palacecraig house (a category B listed building). Most of the
woodland and watercourse areas within the site are designated as sites of interest for nature
conservation (SINCs), while some of the woodland is also subject to tree preservation orders
(TPOs).  The woodland and fields in the southern part of the site were once part of a
designed landscape for the Woodhall House estate, though it is not included on the national
Inventory of Gardens and Designed Landscapes.  The earthworks of an ancient hill fort
(Crogals Castle) straddle the application boundary south of Calderbank, and there are
various surviving remnants of historic industrial and railway infrastructure as well as potential
for other features of archaeological interest from the early industrial revolution and earlier
periods across much of the site. 
4. Proposed Development 
4.1 A copy of the proposed masterplan for the site is attached as Appendix 1 to this report.  The
application seeks planning permission in principle, so the unit numbers and floorspace figures
given here are approximate only.  The applicant proposes to develop up to 980 new homes as
a mixture of houses and flats, 84,540sq/m of storage and distribution floorspace, 27,870sq/m
of general industrial floorspace, an unspecified quantity of retail and other commercial
floorspace to form a new local centre, up to 650sq/m of ancillary retail / commercial floorspace
within the industrial area, a new school campus and a youth football academy, along with
associated infrastructure including a new spine road through the site connecting Sykeside
Road with Woodhall Mill Road.  The description of development also includes health care and
community uses (which may form part of the local centre), and hotel, public house and petrol
filling station uses (which were all part of the original 2018 proposal and were retained in the
description, but are now thought unlikely to be viable and are not shown in the masterplan). 
4.2 The proposed new housing would be located within the north-western quarter of the site,
between Sykeside Road and the Monkland Canal, and also on part of the strip of land between
the canal and the North Calder Water, totalling around 43.7ha in area.  Around 20-25% of
these new houses and flats (up to 245 units) are intended to be affordable homes.  Within this
area the category B-listed High Palacecraig house would be retained, as would several other
existing houses which are surrounded by but not part of the application site.  Just north of the
canal near the centre of the residential area it is proposed to create a new local neighbourhood
centre (0.5ha) on the west side of the new spine road, and a new primary school campus
(2.2ha) and a community sports facility along with the football academy (0.6ha) on the east
Page 15 of 90

Page 16

side of the spine road.  Maximum building height within the new centre and school campus is
envisioned to be 3-5 storeys, whereas the housing would be predominantly 2-storey.  The
application also covers an energy centre for a district heating system, although the applicant
indicates that it is now anticipated that shared ground source heat pumps would be used
instead. 
4.3 The storage, distribution and general industrial units would be dispersed throughout the
southern half of the site, totalling around 36ha in area.  The location and size of these
development plots would be dictated by the existing gaps in the woodland cover, which it is
intended to retain.  The two largest plots are intended for major storage and distribution uses
(with buildings of 55,740sq/m and 28,800sq/m respectively), whilst the other four smaller plots
would be for general industrial use with buildings totalling 27,870sq/m.  (These floorspace
figures are approximate because in practice such large plots usually require bespoke designs
tailored to the specific needs of whichever business would occupy them, and that is not
currently known).  It is also proposed to provide approximately 650sq/m of ancillary retail
and/or food and drink floorspace in the southern part of the site in order to serve workers and
visitors to the industrial area. 
4.4 The proposed new spine road would connect Sykeside Road near the north-west corner of the
site with Woodhall Mill Road in the south-east corner.  The indicative layout shows around
300m of the present Sykeside Road being realigned further to the south, where a new
roundabout would be built at the junction of the proposed new spine road.  The spine road
would pass through the centre of the proposed residential area and cross the Monkland Canal
and North Calder Water on new bridges.  It would then loop through the southern (industrial)
part of the site following a route intended to minimise its impact on existing woodland, and
would connect to Woodhall Mill Road (B802) where another new roundabout would be created. 
Along the spine road new roundabouts would be formed at various points to serve the new
development.  Although the intended purpose of the new spine road is to access the proposed
development, in practice it would also provide a new connection between Coatbridge and the
M8 Chapelhall junction bypassing Calderbank so it would inevitably also become a route for
through traffic. 
4.5 Around 64% of the total site area (157.7ha) would remain as green space, with some parts of
this being enhanced and managed, including biodiversity and environmental improvements
along the canal (subject to agreement with Scottish Canals).  There is currently approximately
59ha of woodland on the site, approximately 94% of which would be retained.  The other 4ha
of the existing woodland would be removed in order to facilitate new roads, but it is proposed
to plant 27.5ha of new woodland resulting in a net increase in the woodland area of 23.5ha
(almost 40%). New or formalised paths would be provided throughout the woodland areas
which would become a country park.  Other areas of green space would include allotments
and community gardens.   The applicant proposes to transfer the green space into community
ownership, with an initial investment from the developer and a proportion of factoring fees
being used to fund its ongoing management and maintenance. 
4.6 The development would be phased to start at each end of the proposed new spine road, with
the first 300 homes (Phase 1A) and the majority of the industrial area (Phase 1B) being
developed concurrently as two separate temporary cul-de-sacs.  These two sections of road
would then be joined together to create the new spine road, with the balance of the housing
together with the local centre, school and football facility (Phases 2A-2C).  Finally the balance
of the industrial floorspace would be provided as Phases 2D and 3.  The development is
estimated as taking 15-18 years to complete.  A breakdown of the proposed phasing is as
follows: 
Page 16 of 90

Page 17

Phase
Houses
& Flats
Storage &
Distribution
(sq/m)
General
Industrial
(sq/m)
Other development Spine Road
1A 300 - - - north third
1B - 55,740 14,870 Ancillary retail / food in industrial area south third
spine
road
- - - - middle third
2A 270 - - Local centre (retail, food/drink,
community etc.) (following
completion of
spine road) 
2B 270 - - Primary school and football academy
2C 140 - - -
2D - - 13,000 -
3 - 28,800 - - 
5. Applicant’s Supporting Information 
5.1 Updates to documents and additional information have been submitted throughout the duration
of the application, and some of the original documents have been superseded.  The applicant’s
current supporting information includes the following: 
• Application Forms and Location Plan;
• Parameters Plan, Indicative Masterplan, Green Masterplan and Phasing Plan;
• Planning Statement (February 2024);
• Environmental Statement (May 2018), including addendum (February 2024) and Wintering
Bird Survey (April 2024);
• Design and Access Statement (June 2018) as amended by Masterplan Vision Statements
(October 2021 and February 2024);
• Transport Assessment (January 2024);
• Climate Change Assessment (February 2024);
• Technical Memorandum on Flood Risk (October 2024);
• Pre-Application Consultation Report (June 2018);
• Arboricultural Constraints Report (March 2018);
• Development Services Report (June 2018) partially superseded by Commercial Property
Market Report (February 2024);
• Utilities Report and Statement (April 2018); and
• Alternative Infrastructure Options Report (June 2018). 
6. Site History 
6.1 Whilst it has always been predominantly countryside, the application site was historically the
location of some the earliest industrial-era coal and ironstone mining in Scotland.  These
industries required transport, and both the Monkland Canal (one of the earliest in Scotland)
and the Monkland and Kirkintilloch Railway (the first public railway in Scotland) had their
eastern termini on the site, opening in 1771 and 1826 respectively.  By the end of the Victorian
period the site contained numerous small coal and ironstone mines, brickworks, two railway
lines, multiple rows of miners’ cottages and a school, as well as a large Eighteenth Century
country house (Woodhall House) and its associated policies (i.e. ornamental parkland). 
However, the minerals were worked out by the early Twentieth Century and the associated
industries and railways closed.  The former mining village of Faskine was cleared, and
Woodhall House was also demolished in the 1920s.  The Monkland Canal closed to navigation
in 1942, by which date its section through the application site was already moribund.  The
previously developed sites were either returned to agricultural use or allowed to rewild.  As a
result, over the last century the area has regained its rural appearance and character.
Page 17 of 90

Page 18

6.2 The site has long been allocated as Green Belt in successive development plans, although
between 1999 and 2009 the former Structure Plan also designated an undefined area at
Woodhall / Faskine as a “nationally safeguarded inward investment location” for single-user
high-amenity class 4 (business) uses only.  That designation reflected national policies at the
time, which sought to ensure that suitable sites were available for major employment uses
requiring large, high-amenity sites, and in which Woodhall / Faskine was described as a
“specialised supply site”.  There were never any specific proposals for Woodhall / Faskine, but
it is likely that what was envisaged was a campus type development with a single very large
corporate headquarters or factory set within the existing parkland, and providing a large
number of new jobs possibly as an inward investment to Scotland. The policy did not allow any
other types of development, and in the absence of any requirement for the site from a major
employer the site remained part of the Green Belt.  After 2009 the structure plan allocation at
Woodhall / Faskine was deleted because the Scottish Government left it to planning authorities
to identify sites for major inward investment, and by that time preferable alternative sites had
been identified to meet the very limited demand for this type of facility. 
7. Development Plan 
7.1 The following development plan policies are considered to be of relevance to this application. 
An assessment of the proposal against these policies is contained in Section 10 below. 
National Planning Framework 4
• Policy 1 (Tackling the Climate and Nature Crises) supports development that addresses
the global climate emergency and nature crises.
• Policy 2 (Climate, Mitigation and Adaptation) supports development that minimises
emissions and adapts to the current and future impacts of climate change.
• Policy 3 (Biodiversity) seeks to protect biodiversity, reverse biodiversity loss, have
development deliver positive effects on biodiversity, and to strengthen nature networks.
• Policy 4 (Natural Places) seeks to protect, restore and enhance natural assets, making
best use of nature-based solutions.
• Policy 5 (Soils) seeks to protect carbon-rich soils, restore peatland and minimise
disturbance of soils by development.
• Policy 6 (Forestry, Woodland and Trees) seeks to protect and expand forests, woodland
and trees.
• Policy 7 (Historic Assets and Places) seeks to protect and enhance historic environment
assets and places, and to enable positive change as a catalyst for the regeneration of
places.
• Policy 8 (Green Belts) supports compact urban growth and using the land around towns
and cities sustainably.
• Policy 9 (Brownfield, Vacant and Derelict Land and Empty Buildings) supports the reuse
of brownfield, vacant and derelict land and empty buildings, and reducing the need for
greenfield development.
• Policy 12 (Zero Waste) supports development which is consistent with the Scottish waste
hierarchy.
• Policy 13 (Sustainable Transport) supports developments that prioritise walking,
wheeling, cycling and public transport for everyday travel, and which reduce the need to
travel unsustainably.
• Policy 14 (Design, Quality and Place) supports well designed development that makes
successful places by taking a design-led approach and applying the Place Principle.
• Policy 15 (Local Living and 20 Minute Neighbourhoods) supports the application of the
Place Principle and the creation of connected and compact neighbourhoods where
people can meet the majority of their daily needs within a reasonable distance of their
Page 18 of 90

Page 19

home, preferably by walking, wheeling, cycling or using sustainable transport options.
• Policy 16 (Quality Homes) supports the delivery of more high quality, affordable and
sustainable homes, in the right locations, providing choice across tenures and meeting
the diverse needs of people and communities.
• Policy 18 (Infrastructure First) supports an approach to land use planning which puts
infrastructure considerations at the heart of placemaking.
• Policy 19 (Heat and Cooling) supports development featuring decarbonised solutions to
heat and cooling demand and ensuring adaptation to more extreme temperatures.
• Policy 20 (Blue and Green Infrastructure) seeks to protect and enhance blue and green
infrastructure and their networks.
• Policy 21 (Play, Recreation and Sport) supports spaces and opportunities for play,
recreation and sport.
• Policy 22 (Flood Risk and Water Management) seeks to strengthen resilience to flood
risk by promoting avoidance as a first principle and by reducing the vulnerability of
existing and future development to flooding.
• Policy 23 (Health and Safety) seeks to protect people and places from environmental
harm, to mitigate risks arising from safety hazards, and to support development that
improves health and wellbeing.
• Policy 26 (Business and Industry) supports business and industry uses and seeks to
enable alternative ways of working such as home-working, live-work units and
microbusinesses.
• Policy 27 (City, Town, Local and Commercial Centres) supports development in town and
city centres, recognising these as a national asset.  The Town Centre First approach will
be applied to help centres adapt positively to long-term economic, environmental and
societal changes.  Town centre living is encouraged.
• Policy 28 (Retail) supports retail investment in the most sustainable locations that are
most accessible by a range of sustainable transport modes.
• Policy 30 (Tourism) supports sustainable tourism development which benefits local
people, is consistent with Scotland’s net zero and nature commitments, and inspires
people to visit Scotland.
• Policy 31 (Culture and Creativity) supports development which reflects our diverse
culture and creativity, and which supports our culture and creative industries. 
North Lanarkshire Local Development Plan (2022)
• Policy PROM LOC1 (Regeneration Priorities) promotes regeneration and sustainable
growth by delivering the right amount of development in the right places, to the right
quality and for the benefit of the communities affected.  Physical regeneration of the
existing urban area and the network of centres therein will be given priority.
• Policy PROM LOC2 (Business Development Sites) supports business growth and directs
it to the Strategic and Local Business Centres and to other existing or allocated business
sites.
• Policy PROM LOC3 (Housing Development Sites) is no longer applicable, as it has been
superseded by the new approach to housing land supply set out in NPF4 policy 16.
• Policy PROM LOC4 (Special Landscape Areas & Green Network Improvements)
promotes the enhancement of the Glasgow and Clyde Valley Green Network.
• Policy PROM ID 1 (Transport Improvements) supports sustainable, multi-modal transport
improvements.   Transport developments will be assessed for their contribution to modal
shift in line with the sustainable modal hierarchy.
• Policy PROT A (Natural Environment and Green Network Assets) protects natural and
resilient, sustainable places by safeguarding natural heritage assets, including national
and locally designated sites, the urban green network and protected species.
• Policy PROT B (Historic Environment Assets) seeks to protect and create resilient
sustainable places by safeguarding historic environment assets, including scheduled
monuments, listed buildings, designed landscapes, canal corridors, and sites of
Page 19 of 90

Page 20

architectural interest.
• Policy PP 2C (Visitor Economy Areas & Locations – Purpose of Place) supports the
provision of tourism and leisure facilities in designated Visitor Economy Locations (such
as the Monkland Canal).  The impact of development proposals on the attractiveness of
sites as Visitor Economy Locations should be considered.
• Policy AD 2C (Visitor Economy Areas & Locations – Amount of Development) sets out
criteria for assessing the amount of development proposed in Visitor Economy Locations.
• Policy PP 4 (Green Belt – Purpose of Place) seeks to protect the setting of communities,
support regeneration of urban areas, protect natural assets and provide a high quality
environment by promoting a Green Belt, within which only development of specific types
or under specific circumstances will be supported.  Development will be resisted unless it
is for agriculture, forestry, recreation, tourism or it has a requirement for a Green Belt
location and can be balanced against any adverse effects on the purposes of the Green
Belt.
• Policy AD 4 (Green Belt – Amount of Development) sets out criteria for assessing the
amount of development proposed within the Green Belt.
• Policy CI (Contributions to Infrastructure) indicates that the council will seek to secure
developer contributions for new development which generates a requirement for new or
enhanced infrastructure or services, including affordable housing, education, transport,
green space and play facilities.
• Policy EDQ 1 (Site Appraisal) requires that any proposed development be appraised in
terms of the site and its surroundings to ensure that it will integrate successfully into the
local area and avoid harm to neighbouring amenity.  Applications are to be accompanied
by documents sufficient to allow the appraisal of all matters relevant to the proposal.
• Policy EDQ 2 (Specific Features for Consideration) details specific technical matters
requiring special assessment, including flood risk, contaminated land, ground stability,
utility pipelines and environmental management areas.
• Policy EDQ 3 (Quality of Development) indicates that development will only be permitted
where high standards of site planning and sustainable design are achieved.  Applications
are required to demonstrate that the proposal takes account of site appraisal, technical
and protected asset policies as listed above and achieves a high quality of development,
including delivering the qualities of successful places and moving towards a low-carbon
economy, amongst other requirements. 
8. Consultations 
8.1 Historic Environment Scotland (HES) initially objected to the application because of concerns
about the impact of new bridges on the setting of the Monkland Canal, but following the
submission of further information about the rationale for the bridges and their location, HES
withdrew their objection. (Subsequent amendments to the proposal have also resulted in one
of the two new canal bridges that were originally proposed being deleted).  Detailed design
of any new bridge(s) over the canal will however require careful consideration, and work
directly affecting the canal would require separate Scheduled Monument Consent. HES
comment that the proposal is likely to have an adverse impact upon the setting of the
Woodhall House site, however given the previous major changes to the landscape in this
area they do not consider that impact to be of sufficient national significance to justify an
objection on their part. HES have confirmed that their position is merely that the proposal
does not raise historic environment issues of national importance so it is outwith their remit,
which should not be taken as support for the proposal.  (For the same reason they have not
commented on the impact on the setting of High Palacecraig, because as it is a category ‘B’
listed building that impact is regarded as a local matter for the council to consider itself). 
Page 20 of 90

Page 21

8.2 The Mining Remediation Authority has no objection to the proposal subject to conditions
requiring that intrusive site investigations be carried out prior to the submission of detailed
applications, and that appropriate information including any necessary remediation proposal
be included with such applications.  They comment that the site has a long history of shallow
coal mining and there is a potential for unrecorded workings, but that the recommendations
contained in the applicant’s coal mining risk assessment are appropriate. 
8.3 NatureScot has no objection to the application and has commented they are content with the
ecological assessment overall.  With regard to those protected species which fall within
NatureScot’s remit for planning consultations (i.e. bats, otters, great crested newts, badgers
and breeding birds), they do not consider that species protection plans would currently be
required.  However, detailed and updated surveys would be needed as part of any
applications for approval of matters specified in conditions, and mitigation work for badgers
and nesting birds would be required. These matters could be addressed by conditions. 
NatureScot also comment that the impact of the proposed development on existing public
footpaths and rights of way should be considered by the council, and a recreation and access
assessment should be required as a condition of any approval. 
8.4 NLC Archaeology Consultant has no objection subject to a condition requiring the approval
and implementation of a scheme of archaeological investigations.  It is noted that the
proposal seeks to minimise its impact on features of archaeological interest which are known
or likely to survive, however as large parts of the site are previously undeveloped arable land
it is possible that there is previously unknown medieval or prehistoric material in those areas. 
The recommendations contained in the archaeology section of the Environment Statement
are considered to be generally appropriate. 
8.5 NLC Education indicate that the development site currently straddles the catchment areas of
two sets of non-denominational and denominational primary and secondary schools, and as
there are already significant capacity constraints across the Monklands some redrawing of
catchment boundaries would be necessary if a development of the size proposed were to be
approved.  Based on the predicted number of pupils from the development (294 primary and
235 secondary) it is considered that two new primary schools with nursery provision would be
needed, and that all four secondary schools would require extension.  The Education Service
therefore requests a developer contribution of £12,739,191 and the provision of land for a
two-primary and nursery campus, which would become necessary as a result of the
development but would serve wider new catchment areas.  They also indicate that as the
existing primary schools are already very close to capacity the new primary schools would be
needed earlier in the development than the current phasing plan proposes (Phase 2B), as
otherwise there would not be sufficient local capacity to cope with children from the early
phases. Additionally, the Education Service notes that as the application site has not been
identified as a site for housing within the local development plan the council has not
programmed or budgeted for these new schools, so their delivery would be challenging. 
Further negotiations would therefore be needed with the applicant about the precise location
and size of the school campus and the funding and phasing of it in the event of the council
being minded to grant permission. 
8.6 NLC Landscape team (commenting on the original 2018 masterplan) objected to the
application on the grounds that it would result in the infilling of the current green space
between Carnbroe and Calderbank and the continuation of the spread of ribbon development
along the M8 corridor between the outskirts of Glasgow and Chapelhall.  It would include the
permanent loss of the open field system which largely informs the character of the site, along
with the remains of the former designed landscape in the southern part of the site.  (The
Landscape team has since been disbanded so there are no comments on the present
revised masterplan which reduced the area of development, however the comments on the
original proposal are still considered to be applicable).
Page 21 of 90

Page 22

8.7 NLC Protective Services has no objection subject to conditions relating to potentially
contaminated land and noise impact.  The conclusions of the noise and vibration and the
ground conditions chapters of the Environment Statement are generally accepted, but any
detailed applications will require more detailed supporting information on these matters
including the results of invasive site investigations were appropriate.  It is important that
detailed surveys are carried out in a comprehensive manner so the phasing of site
investigation and noise impact surveys would need to be agreed as part of the phasing of
development of the site, if this application was to be approved. 
8.8 NLC Infrastructure & Transportation has no objection to the proposal subject to conditions
covering a range of matters including works to mitigate traffic impacts on the local road
network, the development being designed in accordance with appropriate road design and
parking standards, and provision for pedestrians, cyclists and buses.  Their main comments
and requirements can be summarised as follows: 
• Based on the current TA, mitigation works will be needed on the local road network at the
new junctions and a number of off-site locations as follows:
- Provision of a pedestrian footway on the south side of Paddock Street west from the
Monkland Canal towpath to connect to the existing footpath;
- Provision of pedestrian footways on both sides of the realigned Sykeside Road and
the site frontage of the existing road, and of new controlled pedestrian crossings on
each arm of the new roundabout;
- Remodelling of Sykeside Road / Cairnhill Road / Calderbank Road (B802) junction,
including new pedestrian crossings.  The applicant envisages the existing mini-
roundabout being replaced by a signalised junction, but Infrastructure and
Transportation suggest that a roundabout might be needed as this junction is already
operating over its capacity.  The design of this junction would be a matter for a future
detailed AMSC application and would need to demonstrate that there was no net
detriment to traffic flow at this junction as a result of the development;
- Provision of a pedestrian footway on the south side of Calderbank Road.  Detailed
proposals for the Calderbank Road alterations should ensure safe and convenient
pedestrian access to bus stops on Calderbank Road, including relocation of stops
and/or additional pedestrian crossing points if necessary to achieve this;
- Widening of the footway on the western side of Woodhall Mill Road to 3.5m between
Calderbank village and the proposed new roundabout into the site in order to facilitate
active travel.  The new roundabout would also need to include suitable pedestrian
crossing routes within its design; and
- Alterations to the B802 Woodhall Mill Road / B799 Bo’ness Road / A8 Connection
roundabout at Chapelhall including signalisation and provision of an additional lane
between the B802 approach and the B799 northbound exit (i.e. accommodating
vehicles travelling from Calderbank to Chapelhall);
• Not more than 300 homes (or the equivalent trip generators for the industrial area) can
be served by a single means of road access (including a single roundabout serving
multiple roads).  In practice as Phase 1A is intended to contain 300 houses accessed
from the proposed new roundabout on Sykeside Road, this would mean that no more of
the proposed housing could be occupied until the whole of the spine road connecting
through to Phase 1B / Woodhall Mill Road had been completed;
• The impact of the proposed new spine road on local traffic patterns is difficult to predict
with certainty because it has significant potential to divert existing traffic and the design of
the new road is not yet confirmed.  Additionally, the traffic implications of potential major
trip generators (e.g. the proposed new storage and distribution centre and new schools)
are not currently known so would need to be taken into account once information became
available.  Therefore updated Transport Assessments (TAs) would be needed at
Page 22 of 90

Page 23

appropriate stages to confirm or revise the findings of the present TA and identify any
amendments to the off-site road infrastructure works which might become necessary. 
Infrastructure and Transportation therefore request that updated TAs be provided (1)
after completion of the spine road but prior to the completion of the 500th dwelling; and
(2) as part of detailed applications for the subsequent phases of development.  If these
showed a requirement for additional off-site mitigation works the developer should be
required to pay for these and an appropriate mechanism for securing this would be
needed;
• Some technical anomalies in the current traffic modelling data have been noted, and
whilst these are not considered to affect its overall conclusions the matters could be
addressed in future TAs;
• Detailed road, footway and parking design within the development should conform to the
council’s standards, including the design of the spine road which should have no direct
development frontage and should not include direct accesses into the proposed local
centre or schools.  Street design should follow an appropriate hierarchy with residential
areas designed in accordance with the principles of Designing Streets, and street
engineering reviews should be provided in support of any detailed applications for those
areas;
• Infrastructure for pedestrians, cyclists and buses should be included in the detailed
design, including provision of direct pedestrian routes towards existing facilities (e.g.
shops, schools, employment, public transport).  This should include pedestrian
connections to Calderbank Road and the Eurocentral roundabout, active travel
foot/cycleways on main roads in and around the site, suitable pedestrian crossing
facilities and the new spine road being suitable for buses with stops at appropriate
locations;
• Access to existing local services and facilities from much of the site is poor due to the
long walking distances involved, with similarly poor access to existing public transport.
Providing the necessary bus infrastructure on the spine road would not guarantee
provision of a bus service so the developer may have to subsidise this in order to enable 
the development to meet minimum requirements for accessibility; and
• Due to the potential volume and duration of construction traffic, a construction traffic
management plan would be needed and the developer should be required to enter into
an agreement in respect of repairs to local roads necessary because of damage by
construction traffic 
8.9 Scottish Canals neither supports nor objects to the proposal.  The proposal would provide an
opportunity to regenerate this section of the Monkland Canal by renewing infrastructure and
improving public access, but this is balanced by concerns about the scale of the development
and its potential impact on the setting of the canal.  (These comments related to the original
2018 proposal and Scottish Canals have not commented on the most recent masterplan,
however other than the deletion of one of the proposed new bridges, it is considered that the
opportunities and impacts in respect of the canal remain similar). 
8.10 Scottish Forestry has drawn attention to the Scottish Government’s Control of Woodland
Removal Policy, and have indicated that the proposed loss of woodland has not been
justified in the manner required by the policy. Ancient semi-natural woodland (of which
around 1ha would be lost) is an irreplaceable resource which should be protected from
adverse impacts, whilst existing woodland of all types should only be removed where it
would achieve clearly defined public benefits.  They recommend that if the application is
approved it should be subject to suitable compensatory planting which should be secured by
conditions.  (These comments dated from 2021, and the applicant has since amended the
application to increase the amount of compensatory planting from around 8ha to 27.5ha). 
Page 23 of 90

Page 24

8.11 Scottish Gas Networks and SP Energy Networks have no objections. Normal requirements
for any development in the vicinity of utility infrastructure would apply. 
8.12 Scottish Environment Protection Agency (SEPA) has no objection subject to conditions
requiring a drainage impact assessment and a site waste management plan. 
8.13 Scottish Water has no objection to the proposal.  There is currently sufficient water supply
capacity to accommodate the development, although capacity cannot be reserved.  The
developer should provide further information to Scottish Water in respect of waste water. 
Surface water must not be discharged into the public sewers and this should be disposed of
by way of Sustainable Urban Drainage Systems (SUDS).  These are normal requirements
which are typically expected of all new development proposals. 
8.14 Strathclyde Partnership for Transport (SPT) provided comments on an earlier version of the
proposal but have not responded in respect of the most recent amendments.  They
expressed concern that the development did not appear to give sufficient consideration to
public transport given the scale of the proposal and recommended that if permission was
granted a sustainable travel strategy should be required for the whole site. (At the time of
those comments the application included a much larger number of houses and a larger
mixed-use centre, which are no longer proposed, however it is considered that SPT’s
comments about the poor public transport accessibility of the site remain applicable). 
8.15 Transport Scotland has no objection to the application subject to conditions covering the
following Trunk Roads matters: 
• Alterations to the B799/B802/A8 Connection roundabout, as detailed above (para. 8.8);
• Various alterations to the four M8/A8 roundabouts within Junctions 6 (Eurocentral) and
6A (Chapelhall) including widening/additional lanes, and the signalisation of the
Eurocentral north roundabout with new puffin crossings;
• Agreement of phasing, construction traffic management plan, measures to keep roads
clear of construction materials, and of boundary treatments, lighting and drainage insofar
as these might impact upon trunk roads; and
• Requirement for a green travel plan to reduce dependence on the private car. 
Observations have also been provided on local transport matters, which have been
incorporated into the discussion below. 
8.16 Woodland Trust Scotland objects to the application due to its impact upon native long-
established plantation-origin (LEPO) woodland.  They consider that the proposal would
adversely affect important LEPO woodland due to direct loss and fragmentation of woodland
(mainly by forming roads through it), impact on the remaining woodland from noise, light and
dust pollution, threats to the long-term retention of trees near development, adverse
hydrological impacts and the cumulative effects of these impacts resulting in long-term
deterioration of the woodland on the site. 
9. Representations 
9.1 This application has been subject to three separate notification and publicity exercises over an
extended period and has generated 3,625 individual representation submissions, however this
figure includes a large number of duplicates from people who have made more than one
submission and also numerous invalid submissions from people who have not provided their
full name or signature and full address.  Both sides have encouraged the submission of
representations, including the collection of large numbers of signed pro-forma objection letters
Page 24 of 90

Page 25

akin to a petition, and measures taken by the applicant to encourage the submission of
supporting comments.  Both sides have therefore argued that some of the opposing
representations should not be treated as valid for various reasons.  However, applying the
standard set out in the approved Scheme of Delegation (i.e. multiple submissions from the
same address are treated as a single representation) while discounting submissions without a
full name and postal address, the number of representations is as detailed below.  Ultimately,
it is the content of the representations (i.e. the material planning considerations which they
raise) that is relevant, not the final number of them. 
9.2 A total of 2029 valid objections to the proposal were received from 2014 households, 6 current
or former elected representatives (Steven Bonnar MP, Richard Leonard MSP, Gillian Mackay
MSP, Margaret Mitchell MSP, Graham Simpson MSP and Elaine Smith MSP), 2 community
councils whose areas border the site (Cairnhill and Monkland Glen Community Councils), and
from 7 companies or organisations (the Association for the Protection of Rural Scotland,
Helensburgh Green Belt Group, Kilmacolm Eco Space, Ravenscraig Ltd., Save Woodhall and
Faskine Greenbelt Campaign, and Woodhall, Faskine and Palacecraig Conservation Group. 
Excluding comments which were specific to previous versions of the proposal, the reasons for
objection can be summarised as follows: 
Countryside and Landscape 
• Loss of attractive area of countryside, most attractive part of the Monklands;
• Loss of green buffer between Airdrie, Carnbroe, Calderbank and M8 corridor.  Settlements
will instead be joined together by urban sprawl;
• Loss of agricultural land which contributes to food security;
• Loss of designed landscape of former Woodhall House estate (enclosed fields,
geometrically-planted woodland, lake, arboretum);
• Countryside / Green Belt has already been harmed by M8 and new housing at Carnbroe,
and should not be further eroded by non-essential development such as this proposal;
• Development of Green Belt contrary to national and local planning policies;
• Potential for huge industrial ‘boxes’ in the landscape.
• Too much local greenspace has already been lost to development; 
Open Space
• Application site well used by local people for countryside access (walking, cycling, running,
dog walking, horse riding, organised exercise groups, fishing, wildlife watching, metal
detecting,  etc.), especially canal towpath and other footpaths.  Appeal of these will be lost
if they are surrounded by urban development;
• Ready access to the countryside at this location benefits whole community regardless of
age, wealth and access to car, etc.
• Importance of countryside access for mental and physical health in a community with high
levels of poor health, as well as encouraging children to be active and tackling the national
obesity crisis; 
• Lack of alternative places for similar countryside recreation in vicinity;
• Countryside irreplaceable and future generations will be deprived of this area if it is lost;
• Whole site should become a country park, not just the parts that are not viable to develop;
• Some objectors favoured the site becoming a country park but did not consider the
proposed development to be a price worth paying to achieve that.  Other objectors viewed
the applicant’s proposal to transfer undeveloped parts of the site to community ownership
as a means of avoiding responsibility for its future maintenance;
• Proposed football facility with synthetic pitches for those who pay to use them is not a
substitute for community access to countryside;
• Tranquil area of countryside close to town would be lost; 
Page 25 of 90

Page 26

Ecology and Natural Environment
• Adverse impact upon existing woodland, including ancient woodland which will take
hundreds of years to replace;
• Detrimental impact on wildlife habitat due to loss of feeding grounds, fragmentation of
woodland due to construction of roads, noise, light and human activity;
• Adverse impact on large number of wildlife species, including many bird species, great
crested newts and other amphibians, badgers, deer, otter, water vole and insects;
• Adverse impact on flora including trees and wildflowers, including rare species.  Areas
described in the application as scrub actually have varied vegetation and are important
habitats;
• Large parts of site are designated as a SINC and should be protected;
• Loss of large section of Glasgow and Clyde Valley Green Network;
• Ecological survey data out of date;
• Amount of wildlife understated in application documents; 
Historic Environment
• Adverse impact on setting of Monkland Canal, a scheduled monument of national
importance.
• Importance of Woodhall / Faskine area as a centre of early Scottish industrialisation. 
Archaeological remains of early mining, metal working, shipbuilding, tramways and former
Monkland and Kirkintilloch Railway would be destroyed;
• Potential destruction of older archaeological features on site where there is evidence of
neolithic farming, Roman settlement and medieval monastic farming;
• Loss of social history asset for local families whose ancestors lived or worked on the site; 
Housing and Industrial Development
• Ample brownfield land available including at Ravenscraig, Maxim, Eurocentral and
throughout Monklands area so no need to develop greenfield land.  North Lanarkshire has
4th highest extent of derelict land in Scotland;
• Development will undermine efforts to regenerate strategic and other preferable brownfield
sites;
• No requirement for additional housing land on the scale proposed;
• Houses likely to be expensive luxury houses as opposed to houses for local people, and
promises of social housing may be broken;
• Additional industrial land not needed as there are vacant plots in Eurocentral and
elsewhere, and demand for speculative new-build industrial units is currently very limited;
• Indicative layout for industrial plots is poorly laid out and unlikely to meet needs of potential
users.  The industrial area appears to have been included to establish the principle of
development not to actually build;
• Lack of information about who might occupy the industrial plots and doubts about whether
these (and the promised jobs) will materialise;
• Density of proposed development with maximum height of 3-4 storeys not in keeping with
surrounding 2-storey housing;
• Application claims housing will be zero-carbon and served by a district heating system, but
no guarantee that this would be delivered, and even if they were provided it would not
make the development of an unsustainable site any more appropriate;
• Contrary to government policy on developing in sustainable locations and at odds with
international commitments towards addressing climate change 
Town Centres, Services and Utilities
• Lack of detail of proposals for local centre, which potentially could include uses more
appropriate for existing town centres in line with Town Centre First principles;
• Town centres should be regenerated and compact urban growth promoted, rather than
Page 26 of 90

Page 27

building more low density suburban housing and out of centre retail;
• Promises of community facilities within housing development have been broken elsewhere
and are not likely to be delivered here either, especially as application is for permission in
principle only;
• Lack of capacity in local schools, nurseries, medical and dental practices.  Even if new
school is provided local schools would be over capacity until it was complete;
• Existing drainage problems in area may be exacerbated; 
Amenity and Pollution
• Development will involve 20 years of disruption to local communities;
• Impact on existing homes within the development site – owners moved there to live in the
countryside not to live in a housing development;
• Lack of consultation with existing homeowners on the site in relation to access and
ownership rights;
• Damage to air quality – site is pocket of clean air surrounded by towns / roads;
• Pollution from additional traffic in surrounding communities where exhaust emissions are
already high, and risk that this may trigger need for air quality management area;
• Impact of vehicle emissions on a community with existing poor health;
• Noise impact of additional traffic and industrial uses on local residents.  Site serves as
noise buffer between local communities and motorway corridor, whereas proposal would
increase noise;
• Risk of pollution for North Calder Water, including run-off from construction activity.
• Additional light pollution on a site within Scotland’s largest area of light pollution; 
Traffic and Sustainable Travel
• Additional traffic will overwhelm the local road network, which is already subject to
significant congestion (e.g. through Calderbank and Chapelhall in peak hours);
• Deletion of proposed access to Eurocentral junction will result in all traffic being routed
through existing communities exacerbating existing problems;
• Adverse impact of additional traffic through existing communities on road safety and
pedestrians, especially school children;
• Deletion of originally proposed connection to M8 at Eurocentral increases traffic impact on
surrounding communities;
• New link road through site will become a ‘rat run’ and lead to additional through traffic and
existing streets;
• Heavy construction traffic through nearby communities during development of the site;
• Site not suitable for development due to poor public transport and active transport access,
and incompatible with 20 Minute Neighbourhood concept due to distance from town centre;
• Site next to the motorway will be car-reliant and will encourage unsustainable long-distance
commuting, while any new jobs are also less likely to benefit locals; 
Other Matters
• Increased risk of flooding due to surface water run-off into North Calder Water, and flood
risk documents do not provide sufficient detail of intentions to prevent this;
• Parts of site at risk from sinkholes and old mineworkings;
• Development would not benefit local people, only landowners and housebuilders;
• Local community overwhelmingly opposes proposals and has been treated with disrespect
by the Applicant, who inaccurately disparages the condition of the site and understates its
value to and use by the community;
• Applicant has attempted to buy support for proposal by offering to provide new sports
facilities for specific groups, and some supporters have undeclared vested interests in the
development;
• Supporting documents exaggerate the supposed economic and social benefits of proposal
Page 27 of 90

Page 28

and ‘greenwash’ over its unsustainable nature;
• Environmental Impact Assessment should have been re-scoped for 2024 amendments
due to extent of changes. 
9.3 Sixty six representations of support were received from 58 households, 2 community councils
from elsewhere in the Monklands (North Calder and Plains Community Councils) and from 6
companies or organisations (Calderbank Bowling Club, Cruden Homes, Dundas Estates,
Gartcairn Football Academy, the Scottish Junior Football Association and Springfield
Properties). Reasons for supporting the proposal can be summarised as follows: 
• Major investment in area and would benefit local economy and employment and tackle
deprivation;
• Developing the site would sustain a large number of construction jobs;
• Provision of new community facilities (schools, medical facilities, community growing
space);
• Improvements to local road network including new connection to motorway (though that
has since been dropped from the proposal);
• Additional housing, including affordable housing, would help local families to stay in the
area;
• Additional population would sustain local businesses, sports clubs, etc.;
• Housing would be ideal for commuting to Edinburgh and Glasgow;
• Provision of youth football facility;
• Inclusion of environmentally friendly features in proposal (low/zero-carbon features, energy
efficiency, district heating system)
• High proportion of site to be retained as green space and additional tree planting / re-
wilding;
• Welcome proposals for country park in community ownership;
• Improvements to footpaths and lighting, reduced risk of anti-social behaviour and creation
of new public open space would encourage greater and safer use of the site by local
people;
• Site currently in poor condition with derelict / unmaintained areas and problems of anti-
social behaviour, underage drinking, drug use, broken glass, fly-tipping, graffiti, dog mess
etc., which proposal would address;
• Land is not in productive use and there is plenty of other land available for nature;
• Objections should not hold back necessary progress. 
9.4 Four comments neither supporting or opposing the application were received from two
individuals and two companies or organisations (National Amusements and Scottish Badgers). 
Their comments can be summarised as follows: 
• If this goes ahead it is essential that the school, medical centre and dental surgery be
provided in order to take strain off existing facilities;
• Connection to M8 Eurocentral junction should be provided to take strain off existing roads;
• Importance of protecting wildlife in the woodlands during/after development;
• Development should not include a cinema as it fails the sequential approach (this comment
related to the original proposal and a cinema is no longer proposed); and
• Updated badger surveys would be required. 
10. Planning Policy Assessment 
10.1 Section 25 of the Town and Country Planning (Scotland) Act 1997 requires that applications
for planning permission be determined in accordance with the policies of the development
Page 28 of 90

Page 29

plan unless material considerations indicate otherwise.  The development plan comprises
National Planning Framework 4 (NPF4) and the North Lanarkshire Local Development Plan
2022 (NLLDP).  Where there is any incompatibility between these, the policies of NPF4 take
precedence.   
10.2 The site is designated as Green Belt in the NLLDP.  Parts of the site have additional local or
national designations as follows: 
• The Monkland Canal is a Visitor Economy Location;
• Large parts of the site (including much of the woodland and watercourses) are Sites of
Importance for Nature Conservation;
• Both the Monkland Canal and the former Woodhall House are Scheduled Monuments;
• High Palacecraig house is a ‘B’ listed building 
National Planning Framework 4 (NPF4) 
(In the discussion below only those parts of the relevant policies which are applicable to this
proposal are discussed, hence the gaps in the numbering of sub paragraphs) 
10.3 NPF4 Policy 1 (Tackling the Climate and Nature Crises) indicates that “when considering all
development proposals, significant weight will be given to the global climate and nature
crises.” 
10.4 Policy Assessment: The NLLDP had already incorporated most of NPF4 Policy 1’s objectives
through its own policies and land use allocations (including those for residential and
employment development sites), within a wider spatial strategy which seeks to direct
development to allocated sites that were selected using sustainability criteria, and promoting
the reuse and redevelopment of brownfield sites within the urban area in preference to the
development of greenfield and rural land.  This application site is in the Green Belt and the
spatial strategy for the NLLDP has allocated other sites for both residential and employment
uses whilst seeking to protect the Green Belt from inappropriate forms of development.  As
discussed below it is not considered that there is sufficient justification for the development of
this site when the need for development has not been established, and that preferable,
allocated, sites are available.  The planting of additional woodland and other proposals for
habitat mitigation measures would potentially be beneficial in some respects, but it is not
considered that they would offset the wider environmental disbenefits of allowing
development of a valuable greenfield site which is unsatisfactory in terms of sustainable
travel.  It is therefore considered that the proposed development would be contrary to the
aims of Policy 1. 
10.5 NPF4 Policy 2 (Climate, Mitigation and Adaptation) supports development that minimises
emissions and adapts to the current and future impacts of climate change: 
a) Development proposals will be sited and designed to minimise lifecycle greenhouse gas
emissions as far as possible;
b) Development proposals will be sited and designed to adapt to current and future risks
from climate change; 
The Scottish Government issued draft guidance on this policy in December 2024 which
emphasises that NPF4 should be read as a whole and that various other policies are closely
inter-related to Policy 2.  It will be for applicants to demonstrate that proposals have been sited
and designed to minimise lifecycle greenhouse gas emissions. 
Page 29 of 90

Page 30

10.6 Policy Assessment: Subject to suitable detailed design, notably in respect of flood risk, there
should be no significant conflict with part (b) of this policy.  The main question for Policy 2 is
therefore whether or not the proposal would minimise lifecycle greenhouse gas emissions as
required by part (a). 
Any new-build development of this scale will inevitably be resource-hungry and involve
significant greenhouse gas emissions in its materials and construction, however there is
nothing to suggest that this proposal would have a greater impact in that respect than any
similarly sized development on a greenfield site.  Even so, such a development should only
take place where there is a clear need for it.  As will be discussed below, it is not considered
that a need for additional housing and employment land on the scale proposed has been
demonstrated, and allowing such a development would risk undermining efforts to secure
regeneration of more suitable and sustainable locations.  Therefore, the proposal can be
viewed as involving unnecessary greenhouse gas emissions.   
10.7 As with Policy 1, more detail would be needed at AMSC stage to demonstrate how the
proposal would minimise greenhouse gas emissions, for example through the use of carbon
reduction and carbon capture measures, and this could be required by conditions.  However,
such details would not address the fact that the development of the site is significantly
contrary to the NLLDP spatial strategy, it would involve development of a large amount of
greenfield land without a clear needs justification, and as discussed below it is not
particularly accessible by sustainable modes of travel.  The proposed low-carbon heating
system and other carbon reduction measures would be welcome, but such features are
increasingly expected of any development of the scale proposed and it is not considered that
this site offers any particular sustainability benefits when compared to allocated sites.  It is
therefore considered that the proposal would not comply with the aims of Policy 2. 
10.8 NPF4 Policy 3 (Biodiversity) seeks to protect biodiversity, reverse biodiversity loss, have
development deliver positive effects on biodiversity and strengthen nature networks. 
a) Development proposals will contribute to the enhancement of biodiversity, including
where relevant, restoring degraded habitats and building or strengthening nature
networks and the connections between them.  Proposals should also integrate nature-
based solutions where possible.
b) Development proposals for national or major development, or for development that
requires an Environmental Impact Assessment will only be supported where it can be
demonstrated that the proposal will conserve, restore and enhance biodiversity,
including nature networks so that they are in a demonstrably better state than without
intervention.  This will include future management.  To inform this, best practice
assessment methods should be used.  Proposals within these categories will
demonstrate how they have met all of the following criteria:
i. The proposal is based on an understanding of the existing characteristics of the site
and its local, regional and national ecological context prior to development, including
the presence of any irreplaceable habitats;
ii. Wherever feasible, nature-based solutions have been integrated and made best use
of;
iii. An assessment of potential negative effects which should  be fully mitigated in line
with the mitigation hierarchy prior to identifying enhancements;
iv. Significant biodiversity enhancements are to be provided, in addition to any
necessary mitigation.  This should include nature networks, linking to and
strengthening habitat connectivity within and beyond the development, secured within
a reasonable timescale and with reasonable certainty.  Management arrangements
for their long-term retention and monitoring should be included, wherever appropriate;
and
v. Local community benefits from the biodiversity and/or nature networks have been
Page 30 of 90

Page 31

considered.
d) Any potential adverse impacts, including cumulative impacts, of development proposals
on biodiversity, nature networks and the natural environment will be minimised through
careful planning and design.  This will take into account the need to reverse biodiversity
loss, safeguard the ecosystem services that the natural environment provides, and build
resilience by enhancing nature networks and maximising the potential for restoration. 
10.9 Policy Assessment: Details of the impact on ecology are discussed in relation to the
Environmental Impact Assessment below (para. 11.5 et seq).  By reason of its large size and
the mixture of land uses, vegetation and watercourses, the application site contains a range
of different habitats, some of which are listed as priority habitats in the UK Biodiversity Action
Plan.  There are no particular areas affected by the proposal which have outstanding
biodiversity value in their own right, but overall the site’s patchwork of fields and woodland
crossed by watercourses makes a valuable contribution to local biodiversity.  The proposal
would result in the development of large parts of the site, and whilst the areas affected are
mostly agricultural fields of less biodiversity value than other parts of the site there would
nevertheless be a loss of habitat for those species which require grassland or which would
be disturbed by human activity nearby.  On the other hand, the application includes a
substantial amount of new woodland planting which would in due course be of benefit to
local biodiversity.  Whilst short sections of new roads would divide existing woodland, the
new planting would improve connectivity between areas of woodland, and on balance it is
considered that this would result in biodiversity benefits.  Therefore, subject to suitable
detailed mitigation proposals at the AMSC in the event of permission being granted, the
proposal is considered to be capable of complying with part (a) of Policy 3.  The impact on
biodiversity has been thoroughly assessed in the Environment Statement, whose
conclusions are broadly accepted, and the mitigation measures including the extensive
woodland planting are capable of being of net benefit to biodiversity interests.  The proposal
is therefore also capable of complying with part (b) and (d) of the policy. Overall, subject to
extensive mitigation measures which could be secured by conditions, the proposal is
considered to be consistent with NPF4 Policy 3. 
10.10 NPF4 Policy 4 (Natural Places) seeks to protect, restore and enhance natural assets making
best use of nature-based solutions.   
a) Development proposals which by virtue of type, location or scale will have an
unacceptable impact on the natural environment, will not be supported.
d) Development proposals that affect a site designated as a local nature conservation site
or landscape area in the LDP will only be supported where:
i. Development will not have significant adverse effects on the integrity of the area or
the qualities for which it has been identified; or
ii. Any significant adverse effects on the integrity of the area are clearly outweighed by
social, environmental or economic benefits of at least local importance.
e) The precautionary principle will be applied in accordance with relevant legislation and
Scottish Government guidance.
f) Development proposals that are likely to have an adverse effect on species protected by
legislation will only be supported where the proposal meets the relevant statutory tests. 
If there is reasonable evidence to suggest that a protected species is present on a site or
may be affected by a proposed development, steps must be taken to establish its
presence.  The level of protection required by legislation must be factored into the
planning and design of development, and potential impacts must be fully considered
prior to the determination of any application. 
10.11 Policy Assessment:  The application site as a whole also cannot be regarded as a “natural
place” because a large proportion of it is in use as farmland, however within the site there
are large areas (particularly of woodland and watercourses) which are effectively natural or
Page 31 of 90

Page 32

semi-natural places, even if they were formerly part of a managed landscape or are subject
to some ongoing estate management.  By and large, the proposal would develop the
farmland while minimising the direct impact on the more natural parts of the site, and as
noted above the proposal would involve substantial new woodland planting which (subject to
suitable native species being used and an appropriate management regime) would add to
the amount of semi-natural space of the site.  It is therefore considered that the proposal is
capable of complying with part (a) of the policy.   
10.12 Most of the woodland and the main watercourses are designated as Sites of Interest for
Nature Conservation (SINCs) and therefore part (d) is applicable.  The proposal would have
some adverse effects on the quality and integrity of the existing SINCs due to the new spine
road cutting through them, as although the areas affected are relatively small as a proportion
of the overall size of the designated sites there would inevitably be fragmentation of the
woodland at these points.  As discussed elsewhere the social and economic benefits of the
proposal are not considered to be particularly significant, but the new woodland planting
would have ecological benefits and on balance it is considered that the requirements of part
(d)(ii) would therefore be met. It is also considered that the extent of the proposed mitigation
would satisfy the requirements of the precautionary principle (which holds that lack of full
scientific certainty on an issue should not be used as a reason to postpone measures to
prevent environmental damage).  Effects on protected species are discussed in relation to
the Environmental Impact Assessment, and it is concluded that whilst some further surveys
and detailed remediation proposals would be needed as part of any detailed AMSC
applications, the proposal as a whole is not likely to give rise to adverse impacts on any
protected species. Overall, it is considered that the proposal is consistent with NPF4 Policy
4. 
10.13 NPF4 Policy 5 (Soils) seeks to protect carbon-rich soils, restore peatland and minimise
disturbance of soils by development. 
a) Development proposals will only be supported if they are designed and constructed:
i. In accordance with the mitigation hierarchy by first avoiding and then minimising the
amount of disturbance to soils on undeveloped land; and
ii. In a manner that protects soils from damage, including from compaction and erosion,
and that minimises soil sealing.
b) Development proposals on prime agricultural land, or land of lesser quality that is
culturally or locally important for primary use, as identified by the LDP, will only be
supported where it is for [specified purposes] 
10.14 Policy Assessment: None of the site is designated as prime agricultural land (i.e. land within
categories 1, 2 or 3.1).  The majority of the site is Class 3.2 (“land capable of average
production though high yields of barley, oats and grass can be obtained.  Grass leys are
common”), while a smaller area in the south-eastern corner is Class 4.2 (“land capable of
producing a narrow range of crops, primarily on grassland with short arable breaks of forage
crops”).  There is therefore no conflict with part (b) of the policy, and the site does not include
any significant areas of peat. Therefore, subject to the detailed design of the proposal
following the mitigation requirements of part (a) of the policy, the proposal does not conflict
with Policy 5. 
10.15 NPF4 Policy 6 (Forestry, Woodland and Trees) seeks to protect and expand forests,
woodland and trees. 
a) Development proposals that enhance, expand and improve woodland and tree cover will
be supported.
b) Development proposals will not be supported where they result in:
i. Any loss of ancient woodlands, ancient and veteran trees, or adverse impact on their
Page 32 of 90

Page 33

ecological condition;
ii. Adverse impacts on native woodlands, hedgerows and individual trees or high
biodiversity value, or identified for protection on the Forestry and Woodland Strategy;
iii. Fragmenting or severing woodland habitats, unless appropriate mitigation measures
are identified and implemented in line with the mitigation hierarchy;
iv. Conflict with [notices or directions] issued by Scottish Forestry.
c) Development proposals involving woodland removal will only be supported where they
will achieve significant and clearly defined additional public benefits in accordance with
relevant Scottish Government policy on woodland removal.  Where woodland is
removed, compensatory planting will most likely be expected to be delivered.
d) Development proposals on sites which include an area of existing woodland or land
designated in the Forestry and Woodland Strategy as being suitable for woodland
creation will only be supported where the enhancement and improvement of woodlands
and the planting of new trees on the site (in accordance with the Forestry and Woodland
Strategy) are integrated into the design. 
10.16 Relevant to the interpretation of Policy 6 are the Forestry and Woodland Strategy for the
Glasgow City Region (2021), and the Scottish Government’s Policy on Control of Woodland
Removal (2009).  Both of these contain a general presumption in favour of protecting existing
woodland, and a strong presumption against the loss of certain types of woodland including
ancient semi-natural woodland and against the fragmentation of woodlands.  Removal of
woodland should only be allowed where this would achieve significant and clearly defined
public benefits.  In appropriate cases, a proposal for compensatory planting may form part of
this balance. 
10.17 Annex C of the woodland removal policy document sets out circumstances where woodland
removal might be acceptable, including situations where “the change in land use along with
compensatory planting would contribute significantly to … sustainable economic growth and
rural/community development”.  In such cases woodland removal may be acceptable if it
enables appropriate economic development in areas of low income or high unemployment,
amongst other scenarios. 
10.18 Policy Assessment: The proposal includes significant new woodland planting which would
greatly increase the amount of woodland on the site and would provide some new
connections between existing areas of woodland, offsetting both the loss of woodland and
the fragmentation, and this part of the proposal would be supported by part (a) of the policy. 
However, much of the woodland in the southern half of the site is listed on the ancient
woodland inventory as “long established woodland of plantation origin”, while an area along
the southern bank of the North Calder Water is “ancient woodland of semi-natural origin”. 
There is a strong presumption against the removal of any such woodland and against
fragmentation of woodland.  The proposal involves removal of a relatively small amount of
this ancient woodland in order to provide the new link road, and whilst the amount of ancient
woodland affected has been kept to a minimum there would inevitably be some
fragmentation of the woodland due to the construction of a road through it, so the proposal is
inconsistent with part (b). In terms of part (c) for the reasons discussed elsewhere it is not
considered that the proposal would achieve significant and clearly defined public benefit, so
the removal of woodland would not be supported by this part of the policy. However, as
extensive new planting would be integrated into the proposal it would potentially be
consistent with part (d) of the policy.  Overall, some ancient woodland would be lost and it is
not considered that an overriding need has been demonstrated for it or that sufficiently clear
public benefit would arise from the development to justify such a loss in the manner required
by the policy, however the loss of ancient woodland would be relatively small and would be
offset by a disproportionately large amount of new compensatory woodland planting, which
the policy supports.  On balance, it is considered that NPF4 Policy 6 is neutral towards the
proposal.
Page 33 of 90

Page 34

10.19 NPF4 Policy 7 (Historic Assets and Places) seeks to protect and enhance historic
environment assets and places, and to enable positive change as a catalyst for the
regeneration of places. 
a) Development proposals with a potentially significant impact on historic assets or places
will be accompanied by an assessment which is based on an understanding of the
cultural significance of the historic asset and/or place.  The assessment should identify
the likely visual or physical impact of any proposals for change, including cumulative
effects and provide a sound basis for managing the impacts of change. Proposals should
also be informed by national policy and guidance on managing change in the historic
environment, and information held within the Historic Environment Records.
c) … Development proposals affecting the setting of a listed building should preserve its
character, and its special architectural or historic interest.
h) Development proposals affecting scheduled monuments will only be supported where:
i.  Direct impacts on the scheduled monument are avoided;
ii. Significant adverse impacts on the integrity of the setting of a scheduled monument
are avoided; or
iii. Exceptional circumstances have been demonstrated to justify the impact on a
scheduled monument and its setting and impacts on the monument or its setting have
been minimised.
o) Non-designated historic environment assets, places and their setting should be
protected and preserved in situ wherever feasible.  Where there is potential for non-
designated buried archaeological remains to exist below a site, developers will provide
an evaluation of the archaeological resource at an early stage so that planning
authorities can assess impacts.  Historic buildings may also have archaeological
significance which is not understood and may require assessment… 
10.20 Policy Assessment: The application is accompanied by supporting information addressing
the impact of the proposal on historic assets, as required by part (a) of this policy. 
With regard to part (c), High Palacecraig is a category ‘B’ listed Georgian country villa of a
locally popular architectural style, and was originally built for William Dixon (owner of
Scotland’s first blast furnace) before passing to the Baird family of Gartsherrie (major local
ironmasters and colliery owners).  The building and its associated outbuildings and two
walled gardens are situated in open countryside away from other development, with a view
of the North Calder valley and a site which is partially screened by mature trees.  The
property is within the application boundary, but it is intended to retain the building and the
masterplan layout includes a narrow corridor of green space between the front of the house
and the canal so as to preserve some inter-visibility. Any detailed design for the proposed
development would be required to treat the area around the listed building sympathetically,
but inevitably there would be an adverse impact upon its setting as rather than being in open
countryside with an outlook across fields the property would instead be largely surrounded
by new housing. 
10.21 In terms of part (h), the proposal will impact upon the setting of the Monkland Canal and
Woodhall House, which are scheduled monuments. This section of the Monkland Canal is
scheduled because it is an important example of Georgian civil engineering and played an
important role in the early industrial development of central Scotland.  This section of the
canal is particularly important because elsewhere most of the Monkland Canal has been
infilled or built over.  The surviving remains include various rare examples of early canal
infrastructure, and because it is water-filled the essential character of the original canal is still
evident.  The canal currently passes through countryside, some of which is farmland that is
little changed since the construction of the canal, while other parts border post-industrial
sites that have been reclaimed by nature.
Page 34 of 90

Page 35

10.22 Direct impacts on the canal would be limited to the addition of one new overbridge at the
point where the new spine road would cross it. The new bridge would be subject to a
requirement for scheduled monument consent from Historic Environment Scotland and it is
considered that a suitably attractive design would be possible, but it would represent a large
modern structure over the surviving section of canal where at present there are only small,
long-established, bridges.  In terms of the canal’s wider setting, whilst it is proposed to
provide landscaped buffer zones along the sides of the canal which may be attractive areas
in their own right, the proposal would nevertheless result in the loss of much of its present
attractive rural setting.  The extent to which this rural setting is important to the canal is open
to subjective interpretation, as canals by their nature pass through varied landscapes which
can change significantly over the centuries.  Arguably the features of greatest historic
relevance to the setting of the canal were the collieries and other early industries which
provided its raison d’etre, but which have long since disappeared from the local landscape.
On the other hand, the application site is the most important surviving section of the
Monkland Canal, and surrounding it with modern housing would inevitably have some
adverse effect upon its setting.  Whilst Historic Environment Scotland have not objected to
the impact of the development upon the setting of the canal that does not imply that there is
no adverse impact, merely that HES does not consider it to be of national significance.  On
balance, it is considered that the housing and the bridge would detract from the setting of the
Monkland Canal. 
10.23 Woodhall House is a scheduled monument due to the importance of the former house in the
development of the Palladian Revival architectural style in the UK, and although only its
foundations and a very few surface features survive these have potential to provide further
information about the layout and phases of construction of the former building.  Surveys of
Woodhall House and its designed landscape were carried out for the Scottish Office in 1995-
96 as part of the planning of the M8 extension project, and these concluded that the value of
the designed landscape has been severely reduced by the loss of all of the buildings, the
neglect of landscape features and by the subdivision of the estate by former mineral railways
and the A8 road.  The reports concluded that other than the ornamental lake, a drystone
walled ha-ha and the ruins of the walled garden, the designed landscape had already
changed too much for it to be worthy of preservation as an entire designed landscape.  Since
1995 the construction of the M8 extension will have further eroded its value. As a
consequence the Woodhall House estate was not included in the Inventory of Gardens and
Designed Landscapes.  Even so, it is considered that the surviving parts of the estate with its
patchwork of fields and woodland are still of historic interest and provide an attractive local
landscape. 
10.24 The masterplan shows no development around the site of the former house itself, but may
impact upon the remains of an ice house and a ha-ha.  It is thought that buried remains of an
ice house associated with Woodhall House may survive in a field which it is proposed to
build on, although no surface remains are visible.  Ice houses typically included a substantial
underground component which is likely to survive on the site.  The precise impact on the ice
house will not be known until the detailed application stage but it seems probable that the
feature might need to be destroyed to accommodate the largest storage/distribution unit. 
However, archaeological investigations could be required beforehand in order to document
the feature.  The ha-ha (a stone wall sunk into the landscape so that it is not visible when
viewed from one side) is a notable surviving feature of the designed landscape, although it
has previously been breached by a railway embankment.  The proposal seems likely to
retain the majority of the ha-ha but the new spine road would need to cut across it, and the
indicative masterplan also shows the old railway line being developed as an industrial access
road.  The value of the ha-ha would in any event be reduced if the designed landscape of
which it is an integral part were to be lost, so these impacts are considered to be of less
significance than the overall changes to the landscape.  HES note that the proposed
Page 35 of 90

Page 36

development of the open areas within this part of the site would adversely affect the setting
of Woodhall House, but again they do not consider this to be of national significance so it is
not within their remit to object.  It therefore falls to the council to consider the local
significance of this adverse impact on the historic Woodhall House setting.  In assessment, it
is considered that the proposal would result in the loss of what remains of the designed
landscape, as although the woodland would remain the development of large industrial units
within the grassland and fields would irrevocably alter the character and appearance of the
former Woodhall House estate. 
10.25 As regards non-designated historic environment assets, there is potential for features of
archaeological interest throughout the whole site.  The recommendations contained in the
archaeology section of the Environmental Statement are considered to be acceptable, and
any impact on these assets could be adequately addressed by conditions.  The most
important known non-designated feature is the earthworks of an ancient hill fort (Crogals
Castle) which straddles the site boundary (having already been bisected by Woodhall Mill
Road), but which should not be directly affected by the development proposal. Therefore,
there should not be any conflict with part (o) of the policy. 
10.26 Overall, it is considered that whilst the impact on archaeology could be satisfactorily
addressed by conditions, the proposal would have locally significant adverse impacts upon
the setting of the Monkland Canal, Woodhall House, and High Palacecraig.  The policy
indicates that such adverse impacts may be acceptable where there are exceptional
circumstances to justify this (e.g. to provide a critical piece of local infrastructure), but in this
case it is not considered that there is any such justification as the proposal merely seeks to
provide housing and speculative industrial land in excess of identified local requirements. 
The proposal is therefore contrary to NPF4 Policy 7. 
10.27 NPF4 Policy 8 (Green Belts) encourages, promotes and facilitates compact urban growth
and using the land around towns and cities sustainably. 
Development proposals within a green belt designated within the LDP will only be supported
if:
i) they are for:
• development associated with agriculture, woodland creation, forestry and existing
woodland (including community woodlands);
• residential accommodation required and designed for a key worker in a primary
industry within the immediate vicinity of their place of employment where the
presence of a worker is essential to the operation of the enterprise, or retired workers
where there is no suitable alternative accommodation available;
• horticulture, including market gardening and directly connected retailing, as well as
community growing;
• outdoor recreation, play and sport or leisure and tourism uses; and development that
provide opportunities for access to the open countryside (including routes for active
travel and core paths);
• flood risk management such as development of blue and green infrastructure within a
“drainage catchment” to manage/mitigate flood risk and/or drainage issues);
• essential infrastructure or new cemetery provision;
• minerals operations and renewable energy developments;
• intensification of established uses including extensions to an existing building where
that is ancillary to the main use;
• the reuse, rehabilitation and conversion of historic environment assets; or
• one-for one replacements of existing permanent homes. 
and
ii) the following:
Page 36 of 90

Page 37

• reasons are provided as to why a green belt location is essential and why it cannot be
located on an alternative site outwith the green belt;
• the purpose of the green belt at that location is not undermined;
• the proposal is compatible with the surrounding established countryside and
landscape character;
• the proposal has been designed to ensure it is of an appropriate scale, massing and
external appearance, and uses materials that minimise visual impact on the green
belt as far as possible; and
• there will be no significant long-term impacts on the environmental quality of the
green belt. 
10.28 Policy Assessment: Large scale residential or industrial / storage and distribution
developments of the types proposed are not included within any of the categories listed as
being appropriate for the Green Belt, and whilst the application includes some outdoor
recreation / sport facilities these are a relatively minor part of the overall proposal.  The
proposed uses are therefore incompatible with part (i) of the policy, meaning that the
proposal is contrary to Policy 8 as a whole. 
10.29 Compliance with part (ii) of the policy could not outweigh the fact that the proposal is contrary
to part (i), but in any event the proposal is not considered to comply with part (ii) either.  It is
not considered that a clear justification has been provided for allowing this type of
development in a Green Belt location. The local development plan has allocated land for
housing and industrial development on the basis of need and demand, and as discussed
below it is not considered that there is currently a requirement for additional housing land. 
To the extent that there is a potential requirement for additional very large industrial /
business plots, the application proposes two relatively large plots but these are not
considered to offer any significant advantage over allocated plots elsewhere, and as the
proposal is speculative it is not clear whether there is a likelihood of these units being
developed in that manner at all.  If implemented, the proposal would eliminate a large
proportion of the section of Green Belt which separates Airdrie, Carnbroe and Calderbank,
and whilst Policy 8 does not list the prevention of coalescence as an objective such an
outcome would be incompatible with its stated aim of facilitating compact urban growth.  The
proposal would significantly alter the appearance and landscape character of this part of the
Green Belt, which is currently a patchwork of fields and woodland, parts of which have a
parkland character arising from its origins as a planned landscape, but which would be
transformed into a mix of built development and more extensive woodland. 
10.30 The intended policy outcomes of Policy 8 include protecting the “character, landscape,
natural setting and identity of settlements”.  This is of particular relevance in North
Lanarkshire because many of our towns and villages are relatively close to one another and
historically they have coalesced to such an extent that the boundaries and identities of
individual settlements are no longer distinct.  To the south of the site, the series of once
entirely separate settlements including Motherwell, Wishaw, Bellshill, Holytown, New
Stevenston, Carfin and Newarthill have grown into one another to the point that these now
form a single polycentric urban area stretching from Powburn in the west to Newhouse and
Newmains in the east (and in places only separated from neighbouring urban areas in the
Monklands and South Lanarkshire by the width of the M8 and M74 motorways).  North of the
M8 motorway this has not occurred to the same extent, as although Airdrie and Coatbridge
have coalesced at Coatdyke and Sikeside there is otherwise a relatively clear boundary
between them, and the surrounding villages on Calderbank, Chapelhall, Plains and
Glenmavis maintain a clear physical separation from the central Monklands urban area and
therefore retain their own setting and distinct identity.  This proposal would significantly erode
the separation which exists between Airdrie and Calderbank, and would lead to a further
blurring of the boundary between Airdrie and Coatbridge (as the development would share a
Page 37 of 90

Page 38

long boundary with Carnbroe, albeit that there would not be direct road or footpath
connections to Carnbroe due to watercourses).  It is also considered that if this development
were to take place this would inevitably give rise to development pressure on the remaining
pockets of agricultural land between Airdrie and Calderbank, as this was the applicant’s
original intention when the application was submitted in 2018 and the value of that land as
Green Belt would be significantly eroded if the proposed development were to go ahead. 
Along with other permissions for development of former Green Belt land along the M8
motorway corridor (i.e. the Mossend International Railfreight Park and at sites south of
Lancaster Avenue in Chapelhall) the proposal would result in the almost complete loss of a
meaningful Green Belt between the Monklands and the Motherwell-Wishaw-Bellshill urban
areas. It is therefore considered that the proposal would detract from the setting and identity
of Calderbank and Airdrie and would have a serious detrimental impact upon the integrity of
this part of the Green Belt.  (The applicant has argued that the site should not be treated as a
Green Belt site, but this is not accepted and the issue is discussed at para. 12.2 below). 
10.31 Therefore, for all of these reasons, the proposed development is significantly contrary to
NPF4 Policy 8. 
10.32 NPF4 Policy 9 (Brownfield, Vacant and Derelict Land and Empty Buildings) seeks to
encourage, promote and facilitate the reuse of brownfield, vacant and derelict land and
empty buildings, and to help reduce the need for greenfield development. 
a) Development proposals that will result in the sustainable reuse of brownfield land
including vacant and derelict land and buildings, whether permanent or temporary, will
be supported.  In determining whether the reuse is sustainable, the biodiversity value of
brownfield land which has naturalised should be taken into account.
b) Proposals for greenfield sites will not be supported unless the site has been allocated for
development or the proposal is explicitly supported by policies in the LDP.
c) Where land is known or suspected to be unstable of contaminated, development
proposals will demonstrate that the land is, or can be made, safe and suitable for the
proposed new use.
d) Development proposals for the reuse of existing buildings will be supported, taking into
account their suitability for conversion to other uses.  Given the need to conserve
embodied energy, demolition will be regarded as the least preferred option. 
10.33 Policy Assessment: The great majority of the site is greenfield land which has not previously
been developed.  There is a group of existing farm buildings within the site which would be
redeveloped, and this small area is therefore brownfield land.  Various other parts of the
application site are technically brownfield in the sense that they were historically developed
(mainly for coal mining, brickmaking and employee housing), but those areas have long
since been cleared and have been subject to natural regeneration for around a century or
longer.  Apart from an area of undeveloped grassland on the site of the former Faskine
Brickworks (closed 1930s), the land is used overwhelmingly either for agricultural purposes
or as woodland.  Whilst it is intended to retain the existing listed building at High Palacecraig,
and retention of some of the other existing buildings might also be possible, these would be
minor parts of the overall development.  The development proposal therefore relates
overwhelmingly to greenfield agricultural land, the development of which is discouraged by
Policy 9. 
10.34 The site is likely to contain pockets of contamination arising from previous uses, but detailed
site investigations and remediation proposals would be matters for future approval of matters
specified in conditions applications in the event of permission being approved. 
10.35 The proposal does not draw any significant support from parts (a) or (d) of the policy, and it
would be directly contrary to part (b), which indicates that proposals for development of
Page 38 of 90

Page 39

greenfield sites will not be supported unless this is explicitly allowed by LDP policies (which
is not the case here).  Allowing the development of such a large greenfield site would
undermine the prospects of regenerating vacant brownfield land, and therefore the proposal
is contrary to NPF4 Policy 9.  
10.37 NPF4 Policy 12 (Zero Waste) encourages, promotes and facilitates development which is
consistent with the national waste hierarchy.  Development proposals will seek to reduce,
reuse or recycle materials in line with the waste hierarchy, and proposals will be supported
where they: (i) reuse existing buildings and infrastructure; (ii) minimise demolition and
salvage materials for reuse; (iii) minimise waste, reduce pressure on virgin resources and
enable building materials, components and products to the disassembled and reuses at the
end of their useful life; (iv) use materials with the lowest forms of embodied emissions, such
as recycled and natural constructed materials; and use materials that are suitable for reuse
with minimal reprocessing. 
10.38 Policy Assessment: The proposal involves a completely new development on what is
effectively greenfield land, and would therefore use more materials than would be the case
for development involving re-use of existing buildings and infrastructure.  To the extent that
alternative sites exist for some of the proposed development (i.e. the smaller business /
industrial units) and the need for other parts of the development (i.e. the housing and the
large storage / distribution units for which no end-user has been identified), the proposal is
contrary to the objectives of policy 12.  However, these matters are more closely aligned with
Policy 9, discussed above) and compared to other greenfield developments for the uses
proposed there is no reason to anticipate higher than normal generation of waste.  Subject to
suitable detailed design, NPF4 Policy 12 is neutral towards the proposal. 
10.39 NPF4 Policy 13 (Sustainable Transport) supports developments that prioritise walking,
wheeling, cycling and public transport for everyday travel, and which reduce the need to
travel unsustainably. 
b) Development proposals will be supported where it can be demonstrated that the
transport requirements generated have been considered in line with the sustainable
travel and investment hierarchies and where appropriate they: 
i. Provide direct, easy segregated and safe links to local facilities via walking, wheeling
and cycling networks before occupation; 
ii. Will be accessible by public transport, ideally supporting the use of existing services; 
iii. Integrate transport modes; 
iv. Provide low or zero-emission vehicle and cycle charging points in safe and
convenient locations, in alignment with building standards; 
v. Supply safe, secure and convenient cycle parking to meet the needs of users and
which is more conveniently located than car parking; 
vi. Are designed to incorporate safety measures including safe crossing for walking and
wheeling and reducing the number and speed of vehicles; 
vii. Have taken into account, at the earliest stage of design, the transport needs of
diverse groups including users with protected characteristics to ensure the safety,
ease and needs of all users; and 
viii. Adequately mitigate any impact on local public access routes
c) Where a development will generate a significant increase in the number of person trips,
a transport assessment will be required to be undertaken in accordance with the relevant
guidance.
d) Development proposals for significant travel generating uses will not be supported in
locations which would increase reliance on the private car, taking into account the
specific characteristics of the area.
f) Development proposals for significant travel generating uses, or smaller-scale
developments where it is important to monitor travel patterns resulting from the
Page 39 of 90

Page 40

development, will only be supported if they are accompanied by a Travel Plan with
supporting planning conditions / obligations.  Travel plans should set out clear
arrangements for delivering against targets, as well as monitoring and evaluation.
g) Development proposals that have the potential to affect the operation and safety of the
Strategic Transport Network will be fully assessed to determine their impact. 
10.40 Policy Assessment: Part (b) of the policy covers both design and siting issues.  In terms of
the design matters it would be expected that any detailed applications for approval of matters
specified in conditions would include appropriate provision for disabled people, active travel,
public access routes, electric vehicle charging and road safety, as would be required of any
development of the scale proposed.  As noted by the Infrastructure and Transportation
Service, there are two important active travel links which it would be appropriate to include if
the site were to be developed: (1) a direct connection to the Calderbank Road/Sykeside
Road junction to allow convenient access to Cairnhill Road (and thus Airdrie town centre and
station, etc.) and Calderbank Road (with its bus stops); and (2) a connection from the site to
the Eurocentral north roundabout, to allow local people working at Eurocentral / Maxim Park
to walk or cycle there more easily.  Of these, the connection to Calderbank Road is not
shown on the masterplan but should be straightforward to provide, while the connection to
the Eurocentral roundabout is shown on the masterplan but involves a significant ramp so
would require careful design to ensure that it was safe and convenient. 
10.41 However, even if these additional links are provided, it is considered that the development
would not have particularly good pedestrian access to existing services (discussed under
policy 15 below).  Additionally, the site is considered to have insufficient public transport
accessibility (criteria [ii]) which cannot easily be addressed.  The closest railway stations are
1.6km (Airdrie) and 2.2km (Whifflet), while the closest existing bus stops are 250m
(Calderbank Road) and 600m (Sikeside Street) away from the nearest of the proposed new
houses.  These distances are the minimum distances from the closest edges of the proposed
housing areas assuming direct pedestrian routes, but houses in the southern part of the
proposed housing area would be 1km or more further away. For example houses at the
western end of “Phase 2C” (i.e. the most distant part of the proposed housing area) would be
around 1.8km walk from the bus stops on Calderbank Road.  Good practice is for all new
homes to be within 400m walk of a bus stop. The proposed industrial area has similar issues,
in that whilst the south-easternmost unit would potentially be capable of being accessed from
new bus stops on Woodhall Mill Road, other units nearer the centre of the site would involve
a walk of over 1km from bus stops.  Therefore, satisfactory public transport access could
only be achieved if bus services were provided into the site itself, using the new spine road. 
10.42 It would be intended to design the spine road to include bus stops, but that would not in itself
ensure that bus services were actually provided along it. Given that the use and provision of
bus services has been in long term decline it is not considered realistic to expect a new
service purely to serve this development to be viable. The applicant has indicated a
willingness to subsidise the operation of such a bus service, but such arrangements are
temporary measures intended to allow a service to become established before the
development is fully occupied after which the subsidy would cease.  If the bus service was
not commercially viable at that time it would also cease unless public funding was available
to subsidise it in perpetuity.  As indicated by the policy it is therefore preferable for new
development to be accessible by existing public transport services (to support their viability
and avoid additional operating costs), and it would in theory be possible for existing bus
routes to be diverted to serve the new spine road, but that would have undesirable
consequences.  Currently the existing bus services south from Airdrie (to Motherwell and
Eurocentral) use the B802 through Calderbank, and diverting these to serve the new spine
road would leave Calderbank without a bus service.  The other nearby bus service links
Carnbroe with Coatbridge town centre, but again diverting this to serve the application site
instead would leave Carnbroe without a bus. Convoluted routes serving both the application
Page 40 of 90

Page 41

site and Calderbank or Carnbroe might be possible, but would result in extended mileage
and journey times which would erode the attractiveness and viability of the services. 
Ultimately what bus services were provided would be a matter for the commercial operators
and SPT, but it does not appear that the site would be adequately served by public transport
unless that was achieved at the expense of established communities. 
10.43 In contrast to its limited public transport accessibility and walkability, the proposed
development would have ready access to the motorway network, with the new spine road
leading directly towards the Chapelhall motorway junction, with access to both the M8 and
the B799 (which is intended to form part of the “Pan Lanarkshire” orbital route with projected
improvements north and south including the “East Airdrie Link Road” City Deal project).  In
principle good road connectivity is to be supported but the combination of poor public
transport with good motorway access makes it likely that the development will be very reliant
on car travel.  For some business users (e.g. major distribution centres) access to the
motorway network may be a critical requirement, but the proposal is speculative so it is not
clear that any such user is likely to emerge. Even if there were a major business user
requiring a site next to a motorway junction and able to demonstrate a lack of viable
alternative sites, that would not justify any of the other industrial and housing development
which is proposed.  It is therefore considered that taking into account the particular
characteristics of the area, the proposed development would increase reliance on the private
car and thus conflict with part (d) of the policy. 
10.44 Any detailed proposal for a major trip-generating use would be expected to include a green
travel plan in line with part (f) of the policy, but such measures cannot be expected to offset
the underlying shortcomings of the site in terms of sustainable transport. 
10.45 The application is supported by a transport assessment as required by part (c) of the policy.  
In terms of traffic impacts, these are complicated because in addition to the new traffic
generated by the development itself the inclusion of the proposed spine road through the site
has potential to alter existing travel patterns in the area. The spine road would be needed to
connect the proposed industrial area with Airdrie and Coatbridge, and to avoid the need for
traffic generated by the new housing to pass through Calderbank or Chapelhall (where there
are existing capacity problems at peak times).  It is not intended as a through traffic
connection but it would inevitably function as one, as it would allow traffic from Coatbridge
towards Newhouse to bypass Calderbank.  Subject to the various infrastructure
improvements and to updated transportation assessments being provided in the future, the
Council’s Infrastructure and Transportation Service and Transport Scotland have no
objections to the proposal in respect of road safety or traffic management, so there is no
conflict with part (g) of the policy. 
10.46 Overall, whilst the impact of the proposed development on traffic is likely to be acceptable
subject to suitable mitigation and monitoring, and the transport infrastructure within the sites
would be capable of being designed to an appropriate standard, it is considered that the
proposed development would not be suitably accessible by public transport and that it would
be unduly reliant upon the private car.  These shortcomings are such that the proposal is
considered to be contrary to the objectives of policy 13. 
10.47 NPF4 Policy 14 (Design, Quality and Place) supports well designed development that makes
successful places by taking a design-led approach and applying the Place Principle. 
a) Development proposals will be designed to improve the quality of an area whether in
urban or rural locations and regardless of scale.
b) Development proposals will be supported where they are consistent with the six qualities
of successful places:
• Healthy: Supporting the prioritisation of women’s safety and improving physical and
Page 41 of 90

Page 42

mental health.
• Pleasant: Supporting attractive natural and built spaces.
• Connected: Supporting well connected networks that make moving around easy and
reduce car dependency.
• Distinctive: Supporting attention to detail of local architectural styles and natural
landscapes to be interpreted, literally or creatively, into designs to reinforce identity.
• Sustainable: Supporting the efficient use of resources that will allow people to live,
plat, work and stay in their area, ensuring climate resilience, and integrating nature
positive, biodiversity solutions.
• Adaptable: Supporting commitment to investing in the long-term value of buildings,
streets and spaces by allowing for flexibility so that they can be changed quickly to
accommodate different uses as well as maintained over time.
c) Development proposals that are poorly designed, detrimental to the amenity of the
surrounding area or inconsistent with the six qualities of successful places, will not be
supported. 
10.48 Policy Assessment: Part (a) of the policy requires that development proposals should be
designed to improve the quality of an area regardless of scale, while part (c) indicates that
development which is detrimental to the amenity of the surrounding area or inconsistent with
the six qualities of successful places will not be supported.  In this case the proposal involves
the permanent loss of an area of attractive countryside which forms an important part of the
Green Belt, and if it is considered that this area ought to be preserved then no matter how
well the proposed development might be designed then overall it would be detracting from
the quality and amenity of the area.  The proposal would however provide opportunities for
localised environmental improvements (for example, new landscaping at locations which
might improve the appearance of that particular spot), and overall the indicative masterplan
shows a well-designed development which is designed to fit into the local landscape to the
extent that this is possible given the nature of the proposal.  Therefore, whether or not the
proposal can be viewed as consistent with parts (a) and (c) depends upon whether or not the
principle of the development is accepted.  Given that the proposal involves large-scale
greenfield development and the loss of a sizeable area of Green Belt, and that there is little
or no justification for this in terms of housing or industrial land requirements, it is concluded
that the adverse impacts this would have upon the quality and amenity of the area are also
unjustified. 
10.49 Part (b) requires assessment of the proposal against the six qualities of successful places. 
As the application is for Permission in Principle only it is not possible to fully assess this at
this stage, however in broad terms it is assessed as follows: 
• Healthy – The development would retain and in some cases enhance most of the existing
walking and cycling routes on the site.  It would potentially increase the use of these
routes as residents of the new housing would use them and the increased natural
surveillance may lead to enhanced feelings of security, although current path users may
regret the loss of the countryside setting and be less likely to walk on the site as a result. 
Detailed proposals would be expected to demonstrate adequate safety and the provision
of routes and spaces which promote health, though as discussed elsewhere the site has
limitations in terms of walkability and sustainable travel.  Overall impact on health is
therefore assessed as neutral.
• Pleasant – The proposal involves the loss of large areas of existing agricultural and
undeveloped land which currently provide a pleasant countryside landscape. However, in
itself, the proposed development should provide a pleasant and attractive environment. 
Subject to appropriate detailed proposals, the development should deliver attractive built
spaces, and it retains many of the green spaces on the site with enhancements to
improve the appearance and ecological value of these.
Page 42 of 90

Page 43

• Connected – The proposal should include suitable active travel routes within the site,
however as discussed under Policies 13 and 15 the location is not well connected to
existing facilities by convenient walking or public transport, and as such it is considered
likely to be disproportionately reliant on the private car.  As such, the proposal does not
achieve the level of connectivity which would be desirable for a proposal of this nature
and scale.
• Distinctive – The masterplan seeks to incorporate local landscape features into the
design by retaining existing woodland and other features of interest, although inevitably
the development of the fields would result in the loss of the ‘parkland’ character of the
surviving parts of the Woodhall Estate.  Architectural styles would be a matter for detailed
applications, and it should be possible to ensure that the buildings were of a suitable
quality.  In itself, the proposed development should be suitably distinctive.
• Sustainable – The proposal seeks to develop a large greenfield site when there is no
clear requirement for the additional housing or employment which this would result in,
and therefore the proposal cannot be regarded as being sustainable. Whilst it would be
possible to design the new development to incorporate low-carbon and other sustainable
features this would not offset the sustainability shortcomings which arise from it being
located on this particular site.
• Adaptable – Detailed proposals for the new buildings and spaces should reflect good
practice in respect of adaptability. 
10.50 Overall it is considered that in and of itself the proposed development would be well
designed and would provide a pleasant, high quality environment.  However, this cannot
overcome the adverse impacts on local amenity which would arise from the loss of this
important section of the Green Belt, the inherent unsustainability of developing a large area
of greenfield land without a clear locational need or land supply justification for doing so, and
the shortcomings of the site in terms of sustainable transport.  Accordingly the proposal is on
balance considered to be contrary to NPF4 Policy 14. 
10.51 NPF4 Policy 15 (Local Living and 20 Minute Neighbourhoods) seeks to encourage, promote
and facilitate the application of the Place Principle and to create connected and compact
neighbourhoods where people can meet the majority of their daily needs within a reasonable
distance of their home, preferably by walking, wheeling, cycling or using sustainable
transport options. 
Development proposals will contribute to local living including, where relevant, 20 minute
neighbourhoods. To establish this, consideration will be given to the existing settlement
pattern, and the level and quality of interconnectivity of the proposed development with the
surrounding area, including local access to: 
• Sustainable modes of transport including local public transport and safe, high quality
walking, wheeling and cycling networks;
• Employment;
• Shopping;
• Health and social care facilities;
• Childcare, schools and lifelong learning opportunities;
• Playgrounds and informal play opportunities, parks, green streets and spaces,
community gardens, opportunities for food growth and allotments, sport and recreation
facilities
• Publicly accessible toilets;
• Affordable and accessible housing options, ability to age in place and housing diversity 
10.52 Guidance on the 20 Minute Neighbourhood concept confirms that it is based on research
which explored the associations between walking and local destinations, and the ease of
Page 43 of 90

Page 44

access to local services, infrastructure and community spaces when travelling by foot.  The
“20 minutes” means a walk of 10 minutes to any destination and a 10 minutes return journey
(a 10 minute walk covering about 800m at a typical adult walking speed of 5km/h).  The
approach is not meant to be prescriptive as times and distances are not fixed maximums, but
rather they are an indication of how convenient it will be for people to walk to destinations
and how likely they are to do so. 
10.53 Policy Assessment: The proposed 980 dwellings would be situated on the southern edge of
Airdrie, with the closest edges of the new housing area being around 1.8km and 2.8km
walking distance from Airdrie and Coatbridge town centres respectively.  The nearest
designated Local Centre is 600m away (Lorne Place, where there is a small Tesco Express
store and five smaller units in various uses).  The minimum walking distances to the nearest
existing primary schools are 600m (Riverbank PS), 900m (St Stephen’s PS), 1.3km
(Rochsolloch PS/All Saints PS).  The four local secondary schools are all between 2.5km
and 3km walk from the closest parts of the site (Coatbridge HS, St Margaret’s HS, Airdrie
Academy and St Andrew’s HS).  All of the distances quoted above are the minimum
distances possible from the closest of the new houses, and in practice most of the new
houses would be further away from these destinations, in many cases by 1km or more. 
Therefore, with the exception of a small proportion of the new houses located in the north-
western corner of the application site, most of the new homes would be outwith the desirable
800m walking distance from existing schools and local services. 
10.54 The proposed industrial and storage / distribution plots would be widely dispersed across the
southern half of the site.  The northernmost plot would be around 1.2km walk from Sykeside
Road, whilst the large storage / distribution plot at the south-east corner of the site would be
around 800m walk from the centre of Calderbank.  Most of the proposed employment uses
would therefore be within a reasonable walking distance of either the proposed new housing
area or from the southern part of Calderbank, although some of the plots in the centre of the
industrial area would be relatively distant from both, and somewhat isolated due to their
position in the woodland. 
10.55 In order to address the local living requirement the proposal incorporates a new local centre,
as well as a new primary school campus to address school capacity shortfalls. The
application does not specify a precise size or mix of uses for the local centre, however it is
understood that up to 2,000sq/m is envisaged, potentially comprising convenience retail
along with compatible local food and drink, leisure, medical and/or community uses.  Such a
centre would help to address the site’s shortcomings in respect of the 20 Minute
Neighbourhood concept, however it would be important that any new local centre was limited
in size and use to ensure that it did not detract from existing centres or draw in car-borne
custom from further afield (which would be contrary to town centre and retail policies).  The
current position shown for the local centre is central to the application site but relatively
distant from existing housing off Calderbank Road and therefore it is not considered to be the
optimal location on the site for such a use in terms of maximising its accessibility, however
the precise location would be capable of being controlled by condition and confirmed as part
of a detailed AMSC application. 
10.56 The issue of school provision is discussed under Policy 18 below.  If a new primary school
campus is provided on the application site it would obviously be readily accessible on foot to
the new homes.  However, the precise location of such a campus would need to be agreed
with the Education Service as it would also need to be accessible to existing housing which
would also fall within the new catchment areas, so again the location shown on the
masterplan is not considered to be optimal.  As noted above, all of the local secondary
schools are at least 2.5km away from the closest edges of the proposed housing area, and
pupils living in the new houses in the southern part of the site would have a walk of around
4km to these schools, however it is unlikely that any of the houses would exceed the
Page 44 of 90

Page 45

council’s 4.83km (3 mile) threshold for free school transport.  Secondary schools are
therefore within what is deemed to be an acceptable walking distance for such facilities,
albeit one that is well beyond the 20-Minute Neighbourhood envelope 
10.57 Essentially, whilst the application site is on the edge of the built-up area, the established
housing areas which border it to the north of Sykeside Road and Cairnhill Road are
themselves relatively low-density suburban estates which do not contain many local
services, and inevitably the construction of a large housing development on the application
site would be even further away from Airdrie town centre and other local facilities.  The
proposed inclusion of a local centre within the site would help to some degree but, as urban
expansion areas go, the site is not considered to be a particularly good location on which to
achieve ‘local living’ objectives, and it is likely that a high proportion of trips will be made by
car.  Therefore, whilst the proposal meets some of the objectives of the policy, on balance it
is considered to be contrary to Policy 15. 
10.58 NPF4 Policy 16 (Quality Homes) supports the delivery of more high quality, affordable and
sustainable homes, in the right locations, providing choice across tenures and meeting the
diverse needs of people and communities. 
b) Development proposals that include 50 or more homes, and smaller developments if
required by local policy or guidance, should be accompanied by a Statement of
Community Benefit explaining the contribution of the proposed development to: (i)
meeting local housing requirements including affordable homes; (ii) providing or
enhancing local infrastructure, facilities and services; and (iii) improving the residential
amenity of the surrounding area.
c) Development proposals for new homes that improve affordability and choice by being
adaptable to changing and diverse needs, and which address identified gaps in
provision, will be supported.  This could include (i) self-provided homes; (ii) accessible,
adaptable and wheelchair-accessible homes; (iii) build to rent; (iv) affordable homes; (v)
a range of size of homes such as homes for larger families; (vi) homes for older people,
including supported accommodation, care homes and sheltered housing; (vii) homes for
people undertaking further and higher education; and (viii) homes for other specialist
groups such as service personnel.
e) Development proposals for new homes will be supported where they make provision for
affordable homes to meet an identified need.  Proposals for market homes will only be
supported where the contribution to the provision of affordable homes on a site will be at
least 25% of the total number of homes, unless the LDP sets out locations or
circumstances where a higher or lower contribution is justified.
f) Development proposals for new homes on land not allocated for housing in the LDP will
only be supported in limited circumstances where: 
i. the proposal is supported by an agreed timescale for build-out; and 
ii. the proposal is otherwise consistent with the plan spatial strategy and other relevant
policies including local living and 20 minute neighbourhoods; 
iii. and either:
• delivery of sites is happening earlier than identified in the deliverable housing land
pipeline.  This will be determined by reference to two consecutive years of the
Housing Land Audit evidencing substantial delivery earlier than pipeline timescales
and that general trend being sustained; or
• the proposal is consistent with policy on rural homes; or
• the proposal is for smaller scale opportunities within an existing settlement
boundary; or
• the proposal is for the delivery of less than 50 affordable homes as part of a local
authority supported housing plan. 
Page 45 of 90

Page 46

10.59 Following a Court of Session decision regarding a planning application for housing on an
unallocated greenfield site in West Lothian, it has been confirmed that the former approach
of allowing the development of suitable unallocated sites in the event of a shortfall in the
housing land supply is no longer to be used as it is incompatible with NPF4 Policy 16, even
in circumstances where the LDP is older than NPF4 and its policies support such an
approach.  Subsequently, the Scottish Government has clarified its position in a Chief
Planner’s Letter dated 26 June 2024 which indicates that Policy 16 (and indeed all other
NPF4 policies) should be considered in the whole, and that all of the various parts of the
policy should be taken into account in reaching a view on whether a proposal complies with
the policy overall. 
10.60 Policy Assessment: A statement of community benefit covering the three issues specified by
part (b) of this policy has been provided as part of the applicant’s planning statement.  These
benefits are discussed as follows: 
i. The proposal will provide a significant number of new homes, including affordable
homes.  However the need for these homes is not considered to have been
demonstrated, given that there is currently no requirement for this number of additional
houses in order to satisfy North Lanarkshire’s housing land requirements.  It is therefore
considered that the community benefit arising from the provision of additional homes in
this proposal would be modest.
ii. The proposal includes a new local centre, school campus, employment areas, sporting
facilities, and a new spine road which may improve connectivity.   Of these, the local
centre, school campus and spine road are needed wholly or primarily to serve the
proposed development, so although they may also be useful to people in the wider
community this benefit is limited and may be offset by disbenefits.  The probability of and
need for the local centre is discussed elsewhere, but it is not considered desirable to
create a local centre serving a significantly larger catchment than the development site
itself as this would detract from existing (and potentially more accessible) centres.  The
need for the employment sites is also discussed below (and is disputed), whilst the
benefits of the new football academy would be limited to the users of that facility.  It is
therefore considered that the benefits of the proposal in terms of infrastructure and
services for the existing community would be modest.
iii. The proposal would include environmental improvements to the canal corridor and other
areas of the site, including significant new tree planting.  Public access to some parts of
the estate would be formalised and the green spaces would potentially be gifted to the
community as a country park.  The applicant indicates that anti-social behaviour and fly-
tipping are currently problems on the site and considers that these would be reduced
due to additional activity and natural surveillance from the proposed development.  In
assessing these benefits it is acknowledged that environmental improvements and the
formation of a country park would be significant benefits to the amenity of the area,
however this requires to be balanced against the loss of large areas of existing
countryside to development.  Public access to the estate is already available through
existing footpaths (including the well-used canal towpath) and the ‘right to roam’.  The
extent of the fly tipping and anti-social behaviour problem is disputed by objectors, and
whilst these doubtless occur to some extent it is not considered that they render the site
unsightly or unsafe as the applicant suggests.  The main impacts on the amenity of the
surrounding area would be the detrimental impacts arising from the loss of countryside
and to some extent the increase in traffic, and that whilst the proposed new country park
and additional landscaping / woodland planting would be beneficial to amenity, it is not
considered that these would be sufficient to offset the disbenefits. 
10.61 Overall, the proposal provides some community benefits but it is not considered that these
would be sufficient to offset the disbenefits to the community arising from the development of 
Page 46 of 90

Page 47

this part of the Green Belt, so part (b) of Policy 16 does not provide support for the
application. 
10.62 Part (c) of the policy supports provision of adaptable new homes that improve affordability
and choice.  In this case the applicant proposes to provide a significant number of affordable
homes (discussed under part (e) below), and due to the large scale of the development it
may be assumed that the housing would vary in size and type, and would probably include
some wheelchair accessible homes (at least within the affordable housing).  Also due to the
scale and mixed-use nature of the proposal it is also possible that specific types of housing
such as sheltered housing or a care home might be provided, although there are no specific
proposals for that at this time.  Nevertheless, it is likely that the majority of the new homes
would be conventional open market houses for owner occupation, and there is nothing to
suggest that the overall housing mix would be significantly different from any other
commercial housebuilding project of this scale.  Accordingly, policy 16(c) does not provide
support for the proposal. 
10.63 Part (e) supports the provision of affordable homes as a proportion of all new housing
developments, unless otherwise indicated in the local development plan.  In North
Lanarkshire the LDP does not require any affordable housing provision (other than within the
Cumbernauld area) because the availability and delivery of new affordable units is
considered to be sufficient to meet local needs. There is therefore no policy requiring
affordable homes, although for a development of this scale it would be good practice to
provide a mix of house types and tenures.  The applicant proposes that 20-25% of the
housing would be affordable homes, and this is to be welcomed.  The proposal therefore
exceeds the amount of affordable housing which the development plan requires and is
therefore consistent with this part of the policy. 
10.64 Part (f) indicates that new homes on unallocated sites will only be supported in limited
circumstances, where the proposal satisfies all of the three listed criteria: 
i. There must be an agreed timescale for build out, in order to ensure that any sites are
capable of being developed without undue delay and thus to avoid clogging the housing
delivery pipeline with land-banked sites that are unlikely to be developed quickly.  In this
case the applicant has given a broad timescale for build-out (15-18 years).  Given that
the site is greenfield and is relatively unconstrained it may be assumed that the site
would be attractive to housebuilders and therefore the housing development would be
likely to take place, although the requirement to provide the full spine road connection
and school campuses in a relatively early phase may present challenges.
ii. It is required that developments be otherwise consistent with the development plan
spatial strategy including policies on local living and 20 -minute neighbourhoods.  In this
case the proposal is contrary to the development plan spatial strategy as the site is
allocated as Green Belt where there is a strong presumption against developments of
the type proposed, and it is also inconsistent with other policies including those on
sustainable transport and 20-minute neighbourhoods, for the reasons discussed above.
iii. It is required that development fall into one of the four specified circumstances where the
principle of development of an unallocated site might be capable of being acceptable.  In
this case, three of these are not relevant to the application proposal.  The only
circumstance with potential to apply to the application proposal would be if the delivery of
allocated sites within the housing delivery pipeline was happening faster than
anticipated, in which case there would be a need for additional housing land.  It is
currently not possible to calculate the rate of delivery of sites relative to the housing
delivery pipeline in the manner prescribed by the Scottish Government because that
requires at least two consecutive years of housing land audits from the date on which the
council adopted its LDP Delivery Programme (December 2024).  However, the Minimum
All-Tenure Housing Land Requirement (MATHLR) set by the Scottish Government
Page 47 of 90

Page 48

requires at least 7,350 units over 10 years, whereas the most recent housing land audit
(for the period to March 2024) showed an established housing land supply of 16,945
units, of which 8,775 were programmed as deliverable through the 10 year pipeline.
These figures demonstrate that there is significantly more housing land available in the
current supply than is required by the MATHLR, (which until such time as the evidence
report for the next local development plan sets an alternative figure is the local housing
land requirement for North Lanarkshire).  Therefore, there is no evidence that housing
delivery is occurring more quickly than anticipated and even if it were there is sufficient
land available in the housing land supply which could be brought forward if required. The
proposal therefore does not satisfy any of the requirements of part (f)[iii].   
10.65 In the Report of Examination into the local development plan, the Reporter concluded that
whilst the housing land supply for North Lanarkshire as a whole was sufficient there was a
shortfall within the Airdrie and Coatbridge Housing Sub-Market Area (HSMA), and the
applicant considers that the application proposal would address this shortfall.  However,
NPF4 has since completely changed the methodology for determining housing land
requirements, including dispensing with the former HSMAs and superseding LDP policy
PROM LOC 3 (in which context this issue had been discussed).  Therefore, the fact that the
former HSMA had a shortfall is no longer relevant and has no bearing on the assessment of
the application against NPF4 Policy 16. 
10.66 In conclusion the proposal is clearly contrary to part (f) of the policy, which is the part
specifically relating to the development of unallocated sites, and whilst it is not contrary to
parts (b), (c) or (e), these parts of the policy offer limited support at best for the proposal,
which is not considered to be sufficient to outweigh its disbenefits.  The provision of
affordable homes in excess of the requirement of part (e) is welcome but does not justify the
development of a site which is not actually required to meet local housing needs, affordable
or otherwise. The proposal is therefore contrary to Policy 16. 
10.67 NPF4 Policy 18 (Infrastructure First) supports an infrastructure-first approach to land use
planning, which puts infrastructure considerations at the heart of placemaking.  Development
proposals which provide (or contribute to) infrastructure in line with that identified as
necessary in LDPs and their delivery programmes will be supported.  The impacts of
development proposals on infrastructure should be mitigated, and proposals will only be
supported where it can be demonstrated that provision is made to address the impacts on
infrastructure.  Where planning conditions, planning obligations or other legal agreements
are to be used, the relevant tests will apply. 
10.68 Policy Assessment: The types of infrastructure for which the LDP identifies a potential for
development contributions are set out in LDP policy CI, discussed below.  In this case the
relevant categories of infrastructure are: (1) Education; (2) Transport; and (3) Green
Infrastructure, Amenity Space and Play. 
(1) In terms of education, the application would have significant implications for school
capacity as it straddles the catchment boundaries of several different schools, all of
which have capacity constraints which mean that additional capacity would be needed to
accommodate the additional pupils generated by the proposal.  The Education Service
considers that the most effective way to deal with this would be to build a new campus
containing two primary schools and a nursery on the application site, and has requested
that land and a developer contribution towards the construction be provided.  The
applicant is in broad agreement this, although precise details would need to be worked
out, including the location and size of the campus and its phasing.  The development
would give rise to problems for the Education Service as it would bring forward
requirements for new primary schools in the area, and whilst the developer could be
required to provide land and contribution towards these, in practice the schools would
Page 48 of 90

Page 49

need to be large enough to serve wider catchment areas and therefore would need to be
partially funded by the council, which has not budgeted for this.  This funding gap would
be a matter for the council to resolve.
(2) The proposed development would have implications for the local transportation
infrastructure in relation to: (a) mitigating the impacts of additional traffic upon the
surrounding road network; and (b) measures required to make the site more accessible
by means of active travel and public transport.  Transport Scotland and NLC
Infrastructure and Transportation Service consider the proposed mitigation to be
appropriate, and it is considered that the application complies with part (a). In terms of (b)
whilst the site’s shortcomings in respect of sustainable transport have been discussed
above, it would be expected that any detailed masterplan for the development would
incorporate such infrastructure as it is possible to achieve to make the site more
accessible, which would meet the requirements of part (b).
(3) The proposal retains large areas of green space within the site, so there would be no
difficulty in meeting the council’s minimum requirements for green infrastructure. 
Arrangements for long-term management and maintenance of the open space, including
the applicant’s proposal for community ownership of a country park, would require to be
confirmed, and it would be expected that new housing areas incorporate suitably located
and equipped children’s play areas in accordance with the council’s standards. 
Overall, it is considered that the infrastructure required as a result of the proposal would be
capable of being secured by way of a Section 75 Planning Obligation and by matters
specified in conditions, so the proposal is consistent with NPF4 Policy 18. 
10.69 NPF4 Policy 19 (Heat and Cooling) supports development featuring decarbonised solutions
to heat and cooling demand and ensuring adaptation to more extreme temperatures.
f) Development proposals for buildings that will be occupied by people will be supported
where they are designed to promote sustainable temperature management, for example
by prioritising natural or passive solutions such as siting, orientation, and materials. 
10.70 Policy Assessment: Much of Policy 19 relates to supporting existing or planned heat
networks, and is not directly not applicable to this proposal because there is no planned heat
network at this location.  The applicant initially proposed to provide a district heating system
within the development but now expects that a smaller-scale solution using shared ground-
source heat pumps would be used, either of which would be consistent with this policy’s
support for such infrastructure.  This could be addressed through matters specified in
conditions.  Similarly, the requirement for buildings to be designed to promote sustainable
temperature management is also a detailed matter which could be addressed by conditions. 
The provision of decarbonised heating and cooling systems within major new development is
therefore consistent with the objectives of Policy 19, and it is likely that such infrastructure
will increasingly become a normal requirement for development of the scale proposed. 
Therefore, the provision of a district heating system, whilst welcome, does not overcome
other concerns about the sustainability of the proposed development.  The proposal is
therefore capable of being consistent with NPF4 Policy 19, subject to suitable detailed
proposals. 
10.71 NPF4 Policy 20 (Blue and Green Infrastructure) seeks to protect and enhance blue and
green infrastructure and their networks. “Blue and green infrastructure” refers to green
spaces, vegetation and water bodies which provide environmental benefits and contribute to
our quality of life.  Such areas include woodland, parks, playing fields, allotments, street
trees, road verges, green roofs, SUDS basins, watercourses, canals and all other green or
water spaces which have ecosystem benefits. 
a) Development proposals that result in fragmentation or net loss of existing blue and green
infrastructure will only be supported where it can be demonstrated that the proposal
Page 49 of 90

Page 50

would not result in or exacerbate a deficit in blue or green infrastructure provision, and
the overall integrity of the network will be maintained.  The planning authority’s Open
Space Strategy should inform this.
b) Development proposals for or incorporating new or enhanced blue and/or green
infrastructure will be supported.  Where appropriate, this will be an integral element of
the design that responds to local circumstances.  Design will ensure the proposed blue
and/or green infrastructure is of an appropriate type(s), quantity, quality and accessibility
and is designed to be multi-functional and well integrated into the overall proposals.
e) Development proposals that include new or enhanced blue and/or green infrastructure
will provide effective management and maintenance plans covering the funding
arrangements for their long-term delivery and upkeep, and the party or parties
responsible for these. 
10.72 Policy Assessment: Given that the application site is currently undeveloped Green Belt land,
the proposal to develop it would clearly result in a loss of existing green infrastructure and
some fragmentation of that which remained as a result of the development parcels and the
new road cutting through the site.  Most of the land which would be lost is currently farmland,
but the great majority of the more valuable green spaces (i.e. the woodland) and water
environments would be retained.  Nevertheless, the proposal would result in the
redevelopment of large areas of a section of greenfield land within a small pocket of Green
Belt that is already surrounded by urban development, and it is therefore considered to be
contrary to policy 20(a). 
10.73 The applicant also proposes to carry out a substantial amount of new woodland planting as
mitigation, which would consolidate some of the existing areas of woodland and improve
linkages between them.  Other sizeable areas of green space would be retained on the site
as parkland, sports pitches, community orchards, allotments, etc.  For a new urban area the
proposal would have a very high level of blue and green infrastructure which would be of a
high quality and well integrated into the layout.  Policy 20 (b) offers support for these aspects
of the proposal. 
10.74 The arrangements for the long-term management and maintenance of the open spaces
would require to be agreed in order to demonstrate compliance with policy 20(e).  The
applicant’s proposal to pass the majority of the green space to community ownership for use
as a country park is in principle to be lauded, but a funding stream to pay for the ongoing
upkeep of this area would need to be established.  Smaller areas of green and blue
infrastructure within or around the development would likely be maintained through a
communal factoring arrangement as is normal for housing developments and industrial
estates.  These matters should be capable of being addressed by conditions. 
10.75 Overall, if the development of this particular site were consistent with land use policies, the
proposals for blue and green infrastructure would be appropriate for a development of the
scale and nature proposed, subject to detailed proposals and to suitable arrangements for
long-term management and maintenance.  However, as there is not considered to be a
sound justification for the development of this part of the Green Belt, the proposal would
represent an unnecessary loss of existing green infrastructure, and it is therefore considered
to be contrary to the objectives of NPF4 Policy 20. 
10.76 NPF4 Policy 21 (Play, Recreation and Sport) seeks to encourage, promote and facilitate
spaces and opportunities for play, recreation and sport. 
d) Development proposals likely to be occupied or used by children and young people will
be supported where they incorporate well-designed, good quality provision for play,
recreation, and relaxation that is proportionate to the scale and nature of the
development and existing provision in the area.
Page 50 of 90

Page 51

e) Development proposals that include new streets and public realm should be inclusive
and enable children and young people to play and move around safely and
independently, maximising opportunities for informal and incidental play in the
neighbourhood.
f) New, replacement or improved play provision will, as far as possible and as appropriate:
i. provide stimulating environments;
ii. provide a range of play experiences including opportunities to connect with nature;
iii. be inclusive;
iv. be suitable for different ages of children and young people;
v. be easily and safely accessible by children and young people independently,
including those with a disability;
vi. incorporate trees and/or other forms of greenery;
vii. form and integral part of the surrounding neighbourhood;
viii. be well overlooked for passive surveillance;
ix. be linked directly to other open spaces and play areas.
g) Development proposals that include new or enhanced play or sports facilities will provide
effective management and maintenance plans covering the funding arrangements for
their long-term delivery and upkeep, and the party or parties responsible for these. 
10.77 Policy Assessment: Parts (d) and (e) of this policy cover development likely to be occupied
by young people (which would include the proposed new housing as well as the potential
new school campus) and development including new streets or public realm.  These are
required to be inclusive and suitable for young people, with appropriate provisions for play
and relaxation.  These would be matters that required to be demonstrated in subsequent
detailed applications, but there are no obvious barriers to achieving a successful design. 
Parts (f) and (g) specify desirable standards for new play areas and require that suitable
management and maintenance regimes be put in place, and these again are matters which
could be addressed in subsequent detailed applications.  Overall, subject to appropriate
detailed proposals at the approval of matters specified in conditions stage, the proposal
would comply with NPF4 Policy 21. 
10.78 NPF4 Policy 22 (Risk and Water Management) seeks to strengthen resilience to flood risk by
promoting avoidance as a first principle and by reducing the vulnerability of existing and
future development to flooding. 
a) Development proposals at risk of flooding or in a flood risk area will only be supported if
they are for:
i. essential infrastructure where the location is required for operational reasons;
ii. water compatible uses;
iii. redevelopment of an existing building or site for an equal or less vulnerable use; or
iv. redevelopment of previously used sites in built up areas where the LDP has identified
a need to bring these into positive use and where proposals demonstrate that long-
term safety and resilience can be secured in accordance with relevant SEPA advice. 
In such cases, it will be demonstrated by the applicant that:
• all risks of flooding are understood and addressed;
• there is no risk of floodplain capacity, increased risk for others, or a need for future
flood protection schemes;
• the development remains safe and operational during floods;
• flood resistant and resilient materials and construction methods are used; and
• future adaptations can be made to accommodate the effects of climate change
c) Development proposals will:
i. Not increase the risk of surface water flooding to others, or itself be at risk;
ii. Manage all rain and surface water through sustainable urban drainage systems
(SUDS), which should form part of and integrate with proposed and existing blue-
Page 51 of 90

Page 52

green infrastructure.  All proposals should presume no surface water connection to
the combined sewer;
iii. Seek to minimise the area of impermeable surface.
d) Development proposals will be supported if they can be connected to the public water
mains.  If connection is not feasible, the applicant will need to demonstrate that water for
drinking water purposes will be sourced from a sustainable water source that is resilient
to periods of water scarcity. 
10.79 Policy Assessment: The application includes a flood risk assessment and additional
information was provided in response to SEPA comments.  There are some parts of the site
(mainly along the North Calder Water) where there is a risk of fluvial flooding but the
proposed masterplan would not involve incompatible uses within these areas, and whilst
further information would be needed at the detailed application stage the submitted
documents demonstrate that flood risks are understood and capable of being satisfactorily
addressed.  The proposal will incorporate SUDS for surface water, and new public sewers
and water mains.  It is therefore considered that the proposal complies with NPF4 Policy 22. 
10.80 NPF4 Policy 23 (Health and Safety) seeks to protect people and places from environmental
harm, to mitigate risks arising from safety hazards, and to support development that
improves health and wellbeing.
a) Development proposals that will have positive effects on health will be supported.  This
could include, for example, proposals that incorporate opportunities for exercise,
community food growing or allotments.
d) Development proposals that are likely to have significant adverse effects on air quality
will not be supported.  Development proposals will consider opportunities to improve air
quality and reduce exposure to poor air quality.  An air quality assessment may be
required where the nature of the proposal or the air quality in the location suggest
significant effects are likely.
e) Development proposals that are likely to raise unacceptable noise issues will not be
supported.  The agent of change principle applies to noise sensitive development.  A
Noise Impact Assessment may be required where the nature of the proposal or its
location suggests that significant effects are likely. 
10.81 Policy Assessment:  The proposal would include community allotments and formalised open
space and walking / cycling routes, which would be consistent with part (a).  Impacts on air
quality and noise are discussed in relation to the Environmental Impact Assessment below
(para. 11.22 et seq) and it is considered that whilst the proposal would give rise to additional
traffic in the area the effects on air quality are not likely to be significant.  Details of the
intended industrial and storage / distribution uses are not currently known and if any of these
would give rise to disproportionate emissions or noise beyond what the application
documents estimate then details would need to be provided at the appropriate stage. It is
therefore considered that the proposal would comply with NPF Policy 23. 
10.82 NPF4 Policy 26 (Business and Industry) seeks to encourage, promote and facilitate business
and industry uses and to enable alternative ways of working such as home-working, live-
work units and micro-businesses. 
d) Development proposals for business, general industrial and storage and distribution
uses outwith areas identified for those uses in the LDP will only be supported where:
i. It is demonstrated that there are no suitable alternatives allocated in the LDP or
identified in the employment land audit; and
ii. The nature and scale of the activity will be compatible with the surrounding area
e) Development proposals for business and industry will take into account:
i. Impact on surrounding residential amenity; sensitive uses and the natural and historic
environment;
Page 52 of 90

Page 53

ii. The need for appropriate site restoration at the end of a period of commercial use.
f) Major developments for manufacturing or industry will be accompanied by a
decarbonisation strategy to demonstrate how greenhouse gas emissions from the
process are appropriately abated.  The strategy may include carbon capture and
storage. 
10.83 Policy Assessment: The application site is not allocated for business / industry development,
so part (d) of this policy is of primary relevance as it sets out the circumstances where
business and industrial development may be acceptable outwith allocated areas.  In addition
to the proposed use being compatible with the surrounding area, a need for the development
must be demonstrated in terms of the employment land supply.  The applicant has argued
that the proposal complies with this policy because they consider there to be a need for
additional industrial land, in particular for very large units.  A market report has been
provided indicating that the local vacancy rate for industrial buildings is relatively low (3.7%
of floorspace) and that as some of the vacant floorspace may not meet modern requirements
the actual rate of lettable industrial accommodation is lower still. The applicant submits that
there has been a drop in industrial take-up over the past few years and considers that this is
not due to lack of demand but rather it is due to an insufficient supply across all size
brackets.  In terms of very large “big box” units (such as those suitable for major storage and
distribution uses) there is an identified demand for these across central Scotland, but a
shortage of allocated sites capable of accommodating such large units.  An analysis of
commercial units larger than 100,000sq/ft (9,290sq/m) then on the market identified only six
available in the Glasgow region, only two of which were relatively unconstrained and
considered to meet the needs of warehouse operators (one of these being in North
Lanarkshire, and was under offer at the time of the report).  Whilst there are also various
vacant or undeveloped sites allocated for business use at Eurocentral and elsewhere the
applicant considered these to be constrained for various reasons.  The report therefore
concludes that there is a need for more new industrial and warehouse floorspace, especially
very large units, which cannot be accommodated on existing or allocated industrial sites.   
10.84 The council has also recently obtained independent information about the local employment
land situation.  The Glasgow City Region partnership commissioned a property consultant to
provide a market intelligence report on employment land and property across the region, in
order to inform emerging local development plans, the future regional spatial strategy and
potentially support other development and regeneration initiatives around the region.  The
final report was provided in late 2024 and examined the availability and land supply for new-
build industrial property, refurbished industrial property, office and business space, and
serviced employment land.  The report concludes that across the region there is a continuing
need for new-build industrial property to meet market demand including manufacturing and
logistics, and to replace old industrial buildings which are aging towards obsolescence,
particularly to meet the needs of local small and medium enterprises (SMEs).  Medium-sized
modern units appear to be in particularly short supply, and demand for medium and larger
industrial / warehouses is also high.  There is private sector investment at locations close to
motorways and trunk roads, but other areas may require intervention by local authorities.
Much of the older stock is located in traditional towns.  The regional report identifies that
North Lanarkshire has the most modern industrial stock in the region, but although old
buildings are a relatively low proportion of the stock the quantity is substantial so new units
are still required. A large number of sites and an extensive land area are allocated through
the LDP, with North Lanarkshire accounting for more than half of the available employment
land within the Glasgow City Region, although a significant amount of this is in large
regeneration sites requiring substantial up-front investment which will require public funding.
There is some market supply of readily developable larger plots, but limited local supply for
SMEs. Sites are taken-up regularly in the area and pipeline supply for both the local market
and sectors with larger requirements are priorities. 
Page 53 of 90

Page 54

10.85 It is therefore clear that there is an ongoing need to renew the local industrial property stock,
but it is not considered that either the applicant’s report or the regional report demonstrate a
quantitative shortfall in the local industrial land supply.  It is obvious that greenfield sites next
to the motorway will be attractive to business developers (just as they are to housebuilders),
but that does not mean that there is a shortage of allocated land.  Whilst some businesses
do genuinely require a site close to a motorway (e.g. major storage and distribution
businesses), many others do not and may be better located within towns.  Whilst large
regeneration sites may require extensive up-front infrastructure and the renewal of older
industrial estates may require public infrastructure, the prospects of such necessary
investment taking place will be reduced if Green Belt land along the motorway corridor is
instead allowed to be developed without a clear requirement for additional industrial land
having been established.  This would risk undermining efforts to secure the development of
more appropriate and sustainable sites, including strategically important sites and
regeneration priorities, and may increase the requirement for public sector regeneration
funding. 
10.86 The application proposes approximately 27,870sq/m of general industrial floorspace and
84,540sq/m of storage and distribution floorspace.  The masterplan shows the general
industrial floorspace split between four plots of varying size.  Even if the largest of these was
built as a single relatively large unit, it is not considered that it would be of a scale that could
not be accommodated within the existing industrial land supply. It is therefore not considered
that a land supply or locational need for the proposed general industrial units has been
demonstrated. 
10.87 As regards the proposed storage and distribution floorspace, the masterplan suggests two
units of 55,740sq/m and 28,800sq/m respectively.  (By way of comparison, the largest units
within the Eurocentral and Newhouse industrial estates are the Lidl and Co-op distribution
centres of 58,828sq/m and 46,783sq/m respectively).  The availability of sites capable of
accommodating such large buildings is limited, however some potential sites do exist within
the industrial land supply.  For example, Plot Z at Eurocentral extends to 71 acres, and
permissions are in place at Mossend Industrial Rail Park (between Mossend and the M8)
and Ravenscraig which could potentially accommodate units of the size proposed. There are
also several sites that could potentially accommodate a unit of 28,800sq/m, including at
Legbrannock Road, Newhouse and at Glasgow & Edinburgh Road, Carnbroe. These sites
are all acknowledged to have various constraints and challenges, but so too does the
application site. 
10.88 The application is speculative in that no specific occupiers have been proposed.  Whilst the
general industrial units (of 8361sq/m, 4645sq/m, 3716sq/m and 1115sq/m) are of a size
which would appeal to a broad range of businesses, especially if further subdivided, but
there are comparatively few businesses requiring such large buildings such as the proposed
storage and distribution units of 55,740sq/m and 28,800sq/m.  The applicant’s own market
report notes that the upper limit for speculative development was traditionally around
4645sq/m (50,000sq/ft), albeit that this is changing due to an increasing demand for larger
units, and the Planning Service considers that such large units are unlikely to be built unless
occupants are lined up in advance.  The shape of the largest plot would also dictate a
relatively long and narrow building which may limit its appeal to some users.  Whilst it is
accepted that the granting of planning permission in principle would make the site more
appealing to prospective occupants, the possibility that no occupants may emerge for the
proposed large units needs to be considered. 
10.89 It is therefore accepted that there is some requirement for sites large enough for very large
storage and distribution uses, and that this site could potentially accommodate two relatively
large units.  However it is not clear that these two plots would actually meet the needs of the
relatively small number of businesses which require such large units, or that there would not
Page 54 of 90

Page 55

be any preferable alternative sites available to meet these requirements.  Furthermore, even
if a specific locational need had been demonstrated, compliance with part (d) of Policy 26
also requires that the nature and scale of the development be compatible with the
surrounding area.  The application site is part of an attractive area of mixed woodland and
farmland whose nature and appearance would be significantly changed by the proposal.
Whilst there are similar large commercial buildings nearby at Eurocentral, there is a clear
physical and visual barrier (i.e. the motorway corridor) separating these from the application
site.  The impacts of the proposal on this area of countryside are discussed elsewhere in this
report, and it is considered that these impacts would be incompatible with the established
character of the area. 
10.90 In terms of part (e), the proposed industrial and storage and distribution areas would be
separated from existing and proposed houses and would have access to the motorway
network without traffic directly passing houses, so subject to detailed proposals (including
detailed noise impact assessments, etc.) these aspects of the proposal are not considered
likely to give rise to a loss of amenity for residential properties or other sensitive uses.  There
would, however, be a detrimental impact upon the natural and historic environment as
detailed elsewhere in this report.  As the need for the proposed development has not been
established it is considered that the proposal would be contrary to point [i] of part (e). 
10.91 Part 26(f) relates to the decarbonisation of major developments for manufacturing and
industrial processes, but as the application is for permission in principle only and the nature
of the end users is not known, it is not possible to consider this issue at this stage.  However,
future detailed proposals for the commercial uses might require a decarbonisation strategy. 
10.92 Overall, the proposal is considered to be contrary to parts (d)[ii] and (e)[i] of Policy 26, and
that whilst part (d)[i] has potential to provide support for the largest of the proposed units, it is
not considered that the lack of suitable alternative sites which this part of the policy requires
has been satisfactorily demonstrated.  In any event the application is not simply for large-
footprint storage and distribution units (and these would only form a relatively small part of
the development), so even if the need for the large units had been established it would not
justify releasing a swathe of Green Belt for housing and other industrial development.  The
proposal is therefore considered to be contrary to NPF4 Policy 26. 
10.93 NPF4 Policy 27 (City, Town, Local and Commercial Centres) supports development in town
and city centres, recognising these as a national asset.  This will be achieved by applying the
Town Centre First approach to help centres adapt positively to long-term economic,
environmental and societal changes, and by encouraging town centre living. 
b) Development proposals will be consistent with the town centre first approach.  Proposals
for uses which will generate significant footfall, including commercial, leisure, offices,
community, sport and cultural facilities, public buildings such as libraries, education and
healthcare facilities, and public spaces:
i. will be supported in existing city, town and local centres, and
ii. will not be supported outwith those centres unless a town centre first assessment
demonstrates that:
• all centre and edge of centre options have been sequentially assessed and
discounted as unsuitable or unavailable;
• the scale of development cannot reasonably be altered or reduced in scale to
allow it to be accommodated in a centre; and
• the impacts on existing centres have been thoroughly assessed and there will be
no significant adverse effect on the vitality and viability of the centres.
d) Drive-through developments will only be supported where they are specifically supported
in the LDP.
Page 55 of 90

Page 56

10.94 Policy Assessment: This policy applies to all applications for “town centre” type uses,
although there is also a more specific policy covering retail use as discussed under Policy 28
below.  This application seeks to provide such uses in the new local centre, as well as in the
smaller ancillary retail/commercial unit that is proposed within the industrial area. 
10.95 Part (b) indicates that such uses will only be supported in existing centres, and will not be
supported outwith them unless a sequential justification can be demonstrated.  In this case,
the site is not an existing centre and would be regarded as an out-of-centre location where
town-centre type uses would not normally be appropriate.  As discussed above the site is
relatively distant from most local facilities so were the proposed residential and industrial
development to be allowed it would be desirable to provide some local facilities in line with
the 20 Minute Neighbourhoods concept. However, as both the housing and industrial
development are themselves contrary to the relevant development plan policies it therefore
follows that the establishment of a new local centre and other ancillary retail (etc.) floorspace
on the site must also be inconsistent with Policy 27. 
10.96 If the council was minded to allow the proposed housing and industry then the local centre
and ancillary services area could be justified against Policy 27 provided that it was purely
local in its function, and was not drawing trade away from existing centres as required by part
(b)(ii) of the policy.  In this case the application does not define the precise size or nature of
uses within the proposed local centre, and therefore additional detail would be needed. 
Some of the application documents assume a floorspace of 2,000sq/m, but depending upon
what uses were proposed it is possible that this might conflict with Policy 27 or at very least
require a sequential assessment to demonstrate compliance with that policy.  The ancillary
retail / service floorspace is suggested as 650sq/m, but that seems rather large if intended
purely to serve the industrial area, and it would not be desirable to create a roadside facility
aimed at passing motorists.  By way of comparison, at their most recent (2019) survey the
villages of Calderbank and Chapelhall had 2,588sq/m and 2,222sq/m of local centre
floorspace, whilst the nearby local centre at Lorne Place in Coatbridge has only 962sq/m, so
it is considered that 2,650sq/m for the application site may be excessive.  The proposed
location of the local centre is also not ideal in terms of maximising its benefit to the existing
community as it is positioned towards the southern edge of the new housing area.  However,
these are all matters which could be controlled by a condition requiring that the location and
size of the local centre and ancillary service area be further defined in a future AMSC
application. 
10.97 Part (d) of the policy covers new drive-through restaurants. There is currently no specific
proposal for such a use, although the proposal lists “food and drink, public house and leisure”
amongst possible uses, which could potentially cover drive through restaurants.  As the
proposal incorporates a new spine road it would be readily accessible by car and therefore
potentially attractive to drive-through operators.  Were such a use to be proposed at the
detailed stage its acceptability would require to be demonstrated in terms of its impact on
amenity and sustainable travel patterns.  As the current LDP predates NPF4 it does not have
a policy covering the locations of drive through facilities, any such proposal would need to be
assessed on its own merits.  This could also be controlled by a suitably worded condition. 
10.98 Overall the proposal is contrary to NPF4 Policy 27 because the development as a whole is
significantly contrary to multiple development plan policies, and consequently a new local
centre is not justified.  However, in the event of the council being minded to grant the wider
development, then the inclusion of a modest amount of local centre and ancillary
development would be compatible with Policy 27 provided this was limited to a scale and
type which did not conflict with existing centres. 
Page 56 of 90

Page 57

10.99 NPF4 Policy 28 (Retail) supports retail investment in the most sustainable locations that are
most accessible by a range of sustainable transport modes. 
a) Development proposals for retail (including expansions and changes of use) will be
consistent with the town centre first principle.  This means that new retail proposals: 
i. will be supported in existing city, town and local centres, and 
ii. will be supported in edge-on-centre areas or in commercial centres if they are
allocated as sites suitable for new retail development in the LDP.
iii. will not be supported in out of centre locations (other than those meeting policy 28(c)
[or 28(d) which is not relevant to this proposal]). 
b) Development proposals for retail that are consistent with the sequential approach (set
out in a) and click-and-collect lockers pick up points, will be supported where the
proposed development: 
i. is of an appropriate scale for the location; 
ii. will have an acceptable impact on the character and amenity of the area; and 
iii. is located to best channel footfall and activity, to benefit the place as a whole. 
c) Proposals for new small scale neighbourhood retail development will be supported
where the proposed development:
i. contributes to local living, including where relevant 20 minute neighbourhoods and/or
ii. can be demonstrated to contribute to the health and wellbeing of the local community. 
10.100 Policy Assessment: As discussed under Policy 27 above the proposal seeks a new local
centre up to 650sq/m of ancillary floorspace in the proposed industrial area.  Some of this
would be retail floorspace, although the precise amount is not currently known. 
10.101 In terms of part (a), the site is not within an existing town or local centre, on the edge of any
existing centre or allocated for retail use in the LDP.  Rather, it is an out-of-centre location
where retail development is not supported unless it is in accordance with part (c). 
10.102 Part (b) requires that any new retail developments have an appropriate design, accessibility
and impact on amenity.  These are all matters that would be considered at the detailed
application stage.  Provided the retail was intended to serve only the immediately
surrounding housing and industry there should be no difficulty in achieving a suitable level of
accessibility, however if (as the current floorspace proposals suggest) it is intended to serve
a wider catchment area the level of public transport access would be unsatisfactory for the
reasons discussed above. 
10.103 Part (c) allows small-scale neighbourhood retail development which will contribute to local
living and the wellbeing of the local community.  As discussed under Policy 27 above, in the
event of the proposed housing and industrial development taking place then it would be
desirable that there be local convenience retail within a convenient walking distance, so in
those circumstances a limited amount of retail development would be consistent with Policy
28(c).  However, as the development as a whole is inconsistent with development plan
policies it follows that there is also currently no justification for the provision of ancillary retail
development.  Additionally, the amount of retail floorspace would need to be limited so as to
ensure that it was purely local in its function and did not become an out-of-centre
development drawing trade away from surrounding centres. 
10.104 The proposal therefore conflicts with parts (a), (b) and (c), and is contrary to NPF4 Policy 28
as a whole.  However, as with Policy 27 above, in the event of the Council being minded to
grant permission for the wider development then Policy 28 (c) would support some limited
retail development to satisfy Local Living / 20 Minute Neighbourhoods requirements, which
could be controlled through planning conditions and future AMSC applications.
Page 57 of 90

Page 58

10.105 NPF4 Policy 30 (Tourism) supports sustainable tourism development which benefits local
people, is consistent with Scotland’s net zero and nature commitments, and inspires people
to visit Scotland. 
a) Development proposals for new of extended tourist facilities or accommodation,
including caravan and camping sites, in locations identified in the LDP, will be supported. 
10.106 Policy Assessment: As noted below the Monkland Canal is designated as a Visitor Economy
Location within the LDP and the applicant suggests that the proposal would encourage the
use of the canal for recreational purposes.  Proposals to encourage tourism would therefore
be consistent with NPF4 Policy 30, however there are no specific proposals for tourism
development and these would be at most a very minor part of the development which is
proposed. 
10.107 NPF4 Policy 31 (Culture and Creativity) supports development which reflects our diverse
culture and creativity, and which supports our culture and creative industries. 
a) Development proposals that involve a significant change to existing, or the creation of
new, public open spaces will make provision for public art.  Public art proposals which
reflect diversity, culture and creativity will be supported. 
10.108 Policy Assessment: The application includes substantial new public open spaces and
detailed proposals would therefore be required to include provision of public art in order to
demonstrate compliance.  Subject to this, the proposal should comply with NPF4 Policy 31. 
North Lanarkshire Local Development Plan, 2022 (NLLDP) 
10.109 Although the North Lanarkshire Local Development Plan was adopted in June 2022, nine
months before NPF4 came into effect, many NPF4 policy objectives are reflected in NLLDP
policies.  The NLLDP policies relevant to this application are discussed below. 
10.110 NLLDP Policy PROM LOC 1 (Regeneration Priorities) indicates that the council will promote
regeneration and sustainable growth by delivering the right amount of development in the
right places, to the right quality and for the benefit of the communities affected.  Physical
regeneration of the existing urban area and the network of centres therein will be given
priority. 
10.111 Policy Assessment: The application site does not comply with the council’s regeneration
priorities in terms of its location as it is an unallocated site in an area designated as Green
Belt, and other land is allocated and available locally for both housing and industrial
development in preferable urban and urban-edge locations.  The proposal does not promote
the physical regeneration of the existing urban area or identified centres, and instead could
serve to undermine the regeneration of such areas.  The proposal is therefore contrary to
LDP Policy PROM LOC1. 
10.112 NLLDP Policy PROM LOC 2 (Business Development Sites) indicates that the council will
support and direct business development to the Strategic and Local Business Centres and
Industrial & Business Land Supply.  This comprises of: 
• buildings and land located in the Strategic and Local Business Centres,
• marketable / potentially marketable sites identified in the 2017 Industrial & Business Land
Survey,
• sites for specific uses, and
Page 58 of 90

Page 59

• proposed business sites confirmed by the local development plan examination 
Additional sites identified in the Industrial & Business Land Supply will be brought forward
through consideration of applications for planning permission, subject to any specific
restrictions than may be identified in the Area Strategies. 
10.113 Policy Assessment: The proposal does not direct business to any of the strategic or local
business centres or to sites within the industrial and business land supply, and to that extent
it conflicts with the objectives of this policy.  However, the policy is only applicable to sites
which are allocated as business centres and the assessment of development proposals
which lie outwith these is left to the relevant land use policies (in this case those relating to
the Green Belt).  Therefore, LDP Policy PROM LOC2 is neutral towards the proposal. 
10.114 NLLDP Policy PROM LOC 3 (Housing Development Sites) set out the council’s former
approach to housing land supply.  However, this policy has been superseded by the new
housing land delivery pipeline approach set out in NPF4 policy 16.  It is therefore considered
that LDP Policy PROM LOC3 is no longer applicable, and this view has been affirmed by
recent appeal decisions. 
10.115 NLLDP Policy PROM LOC4 (Special Landscape Areas & Green Network Improvements)
promotes understanding and awareness of the distinctive character and special qualities of
designated landscape areas and the enhancement of the Glasgow and Clyde Valley Green
Network.  Green Networks are a means of attracting people into their local natural
environment by improving community access, recreational opportunities, and environmental
and ecological quality close to and within communities.  They are seen as a key mechanism
for reversing the effects of fragmentation on biodiversity.  Any proposals affecting the Green
Network and other natural areas or green spaces which contribute to the quality of life of
local communities will be required to satisfy the provisions of all EDQ and PROT policies,
and new development should include appropriate integrated blue-green infrastructure. 
10.116 Policy Assessment: The application site is not subject to any specific landscape designation
and neither is it designated as a green network opportunity location.  Whilst part of the site is
a designed landscape, it is not formally designated as such for the reasons explained above. 
However it is a sizeable green space which forms part of the Glasgow and Clyde Valley
Green Network and which contributes to the quality of life of neighbouring communities.  The
proposal would result in the loss of large areas of primarily agricultural countryside and
would in some respects reduce the attractiveness of the area for recreational use (e.g. to
people who use the canal towpaths and value their present rural setting).  On the other hand,
the proposal would retain and enhance footpaths and recreational access to the countryside,
potentially making the area more accessible to a larger number of people.  The proposal
would largely retain the existing woodland and would add a significant amount of additional
woodland, which could potentially be of net benefit to ecological interests.  Existing blue
infrastructure would be largely unaffected, and new / retained blue-green infrastructure would
be well integrated into the proposed development.  Therefore, were the proposal supported
by other LDP policies, it would be considered to be broadly neutral in respect of PROM LOC
4.  However as the proposal is contrary to policies PROT B and EDQ 3 (as discussed below),
by extension the loss of green network which it involves must also be considered contrary to
LDP policy PROM LOC 4, as these impacts upon the Green Network have not been
sufficiently justified. 
10.117 NLLDP Policy PROM ID 1 (Transport Improvements) supports sustainable, multi-modal
transport improvements identified through local and national transport strategies and arising
from the Contributions to Infrastructure (CI) policy.   Other developments will be assessed for
their contribution to modal shift in line with the sustainable modal hierarchy and current
Strategies, in accordance with the plan’s EDQ policies.
Page 59 of 90

Page 60

10.118 Policy Assessment: The proposed new spine road does not feature in any local or national
transport strategy or programme and therefore requires to be assessed for its contribution to
modal shift in line with the sustainable modal hierarchy.  That hierarchy is set out in local and
national transport strategies, including National Transport Strategy 2 (2020), the regional
Transport Strategy for West of Scotland 2023-2038 (2023) and the North Lanarkshire Local
Transport Strategy (2010) as prioritising (1) walking and wheeling; (2) cycling; (3) public
transport, (4) taxis and shared transport and lastly (5) private car use, which is the least
favoured mode.  The spine road is likely to divert some existing traffic away from Calderbank
which would be of some localised benefit to Calderbank, though this would be offset
somewhat by the new traffic arising from the development itself.  As discussed above, due to
its position on the edge of the built-up area the proposed development would have very
limited access to existing services and facilities within a ten minute walk, and would be
reliant upon new facilities being constructed within the site in order to satisfy 20 Minute
Neighbourhood principles.  Even so, some facilities (e.g. town centres, secondary schools
and railway stations) would require a lengthy walk, and it is considered that the proposed
development is unlikely to be well served by buses.  These limitations, together with the
proposed development’s ready access to the motorway and major road network, would serve
to encourage car use.  Therefore, the proposal is not consistent with local or national
transport strategies and accordingly it is also contrary to LDP Policy PROM ID 1. 
10.119 NLLDP Policy PROT A (Natural Environment and Green Network Assets) indicates that the
council will protect natural and resilient sustainable places by safeguarding natural heritage
assets.  Several categories of natural heritage sites are identified, including: 
• Category A2 (National Sites) including Ancient Woodland.  When assessing suitability for
woodland removal, applicants should refer to the Clydeplan Forestry and Woodland
Strategy and adhere to the Scottish Government’s Control of Woodland Removal Policy.
• Category A3 (Local Sites) including Sites of Importance for Nature Conservation (SINCs),
tree preservation orders (TPOs), core paths and rights of way.  Planning permission will
only be granted for proposals potentially affecting Local Sites if it can be demonstrated
that there will be no adverse impact or that any impacts can be mitigated in
environmental terms relevant to the impact.
• Category A4 (Urban Green Network) comprising natural areas such as urban wildlife
corridors, trees, woodland, watercourses and flood plains, and other green open spaces
contributing to quality of life in local communities.  The council will maintain community
wellbeing in residential areas by protecting the Urban Green Network.  Planning
permission will only be granted for proposals potentially affecting the Urban Green
Network if it can be demonstrated that there will be no adverse impact or that any
impacts can be mitigated in environmental terms.  Policy EDQ3 outlines how
development proposals may protect, enhance and manage existing and provide new
Green Network infrastructure.
• Category A5 (Protected Species).  Development that significantly affects a species
protected by law will only be permitted where an appraisal has demonstrated that the
protected species would not be compromised; or any significant adverse effects on the
protected species are mitigated to facilitate protection of individual species members,
reduce disturbance to a minimum and provide appropriate alternative habitats to sustain
at least the current levels of the species locally. 
10.120 Policy Assessment: As discussed in relation to NPF4 Policy 6 the proposal does not fully
comply with national and regional policies in respect of ancient woodland, but the small
amount of ancient woodland and TPO woodland which would be lost would be balanced by
substantial new planting so the proposal is considered to be neutral in this respect.  Impacts
on ecology including protected species are detailed in the discussion of the Environmental
Page 60 of 90

Page 61

Impact Assessment below (para. 11.5 et seq), and it is concluded that subject to suitable
mitigation there would be no unacceptable impacts.  The proposal would maintain the
existing path network and provide new and enhanced paths.  As discussed under LDP Policy
PROM LOC 4 above there would be a negative impact on the Urban Green Network due to
the proposal resulting in the loss of an area of countryside around towns which is contiguous
of the wider urban green network, albeit that woodland and other more sensitive parts of the
site would be retained and public recreational access to the remaining green network assets
would be maintained and potentially enhanced.  The proposal therefore has a series of
negative impacts which are each relatively minor and would be capable of being mitigated
against if the development as a whole was considered to be necessary or desirable.
However as it is not considered that the wider development has been sufficiently justified it
follows that the negative impacts on the natural environment and green network are also not
justified, and that the proposal is therefore contrary to LDP policy PROT A. 
10.121 NLLDP Policy PROT B (Historic Environment Assets) seeks to protect and create resilient
sustainable places by safeguarding historic environment assets.  Categories of heritage
environment asset include: 
• Category B2 (National Assets) including Scheduled Monuments.  Development shall
preserve archaeological features in sit and within an appropriate setting.  Adverse impact
on the integrity or setting of the monument shall not be permitted unless there are
exceptional circumstances.
• Category B3 (Regional/Local Assets) including category B and C listed buildings, canal
corridors and sites of archaeological interest.  Applications for planning permission in
principle are not normally considered appropriate to listed buildings.  The layout, design,
materials, scale, siting and use of any development should be appropriate to the
character and appearance of the listed building and its setting, and there is a
presumption against demolition or other works adversely affecting the special interest of
a listed building.  Canal corridors are important to the preservation and setting of the
Monkland Canal, and development within defined Canal Corridors shall be consistent
with protecting this environment through the application of EDQ policies.  For sites of
archaeological interest, the aim should be to preserve in situ wherever feasible.  An
archaeological evaluation report may be required, and the council will weigh the
significance of the archaeological resources and impacts upon them against other merits. 
10.122 Policy Assessment: As discussed above in relation to NPF4 Policy 7, it is considered that the
proposal would have adverse impacts on the setting of the Monkland Canal (Scheduled
Monument and a canal corridor) and High Palacecraig House (B-Listed Building), while the
impacts on Woodhall House and other heritage assets would be capable of being
satisfactorily controlled by conditions.  The policy does allow for development which
adversely affects listed buildings where this is essential to delivering significant benefits to
economic growth or for the wider community, and if there was an established need for the
proposed new housing (which is the part of the development that would most directly affect
both the canal and High Palacecraig House) then it is possible that the need for additional
housing land would provide such a justification, however as there is currently no such
requirement the proposal is contrary to LDP Policy PROT B. 
10.123 NLLDP Policy PP 2C (Visitor Economy Areas & Locations – Purpose of Place) supports the
provision of tourism and leisure facilities in designated Visitor Economy Locations.  The
policy is primarily concerned with the assessment of applications for tourism and leisure
facilities, however all applications for development within designated Visitor Economy
Locations should be subject to an assessment of appropriateness including consideration of
its impact on its attractiveness as a Visitor Economy Location.  The related Policy AD 2C
(Visitor Economy Areas & Locations – Amount of Development) sets out criteria for
assessing the amount of development proposed in Visitor Economy Locations.  Housing,
Page 61 of 90

Page 62

business, general industrial and storage or distribution are all listed as inappropriate uses
within Visitor Economy Locations. 
10.124 Policy Assessment: The Monkland Canal corridor is a designated Visitor Economy Location. 
The proposal involves development in the vicinity of the canal, but other than bridge and
public access works no development is anticipated within the canal boundary.  Whilst there
are no detailed proposals for specific tourism facilities the application does cover food and
drink and hotel uses, which could potentially contribute towards tourism if sited next to the
canal.  The appellant considers that the development as a whole will improve the
appearance and amenity of the canal corridor by providing for increased maintenance and
natural surveillance to discourage anti-social behaviour such as fly tipping. On the other
hand, developing the land on either side of the canal will result in the loss of its rural setting
and may make the canal less appealing to some visitors.  Overall, it is considered that LDP
policies PP2C and AD2C are neutral towards the proposal.  
10.125 NLLDP Policy PP 4 (Green Belt – Purpose of Place) seeks to protect the setting of
communities, support regeneration of urban areas, protect natural assets and provide a high
quality environment by promoting a Green Belt, within which only development of specific
types or under specific circumstances will be supported.  The purpose of the Green Belt is to
protect the setting of communities, support regeneration by directing growth to urban areas,
protect natural assets and provide a high quality environment.  Applications for agriculture,
forestry, recreation, development that need a non-urban location and appropriate visitor
economy development will be supported, but other types of development will be resisted.
Proposals for development requiring a Green Belt location require to be balanced against
any adverse effects on the purposes of the Green Belt. 
10.126 Applications for development in the Green Belt will be subject to an assessment of
appropriateness including (but not limited to): 
• A business plan or statement justifying that the development is compatible with the
Green Belt;
• A statement explaining why the proposal is not best suited to being located in a Centre or
General Urban Area, taking the Town Centres First sequential approach where
appropriate;
• A statement on the scale and nature of existing development in the Green Belt;
• Evidence that there is a specific locational requirement for the proposal;
• Evidence that the proposal will result in significant economic benefit; and
• Details of its impact on travel patterns and accessibility by sustainable modes of
transport. 
10.127 Policy Assessment: The proposed development does not fall into any of the categories listed
as being supported in the Green Belt, and is instead comprised primarily of types of
development which the LDP seeks to direct to urban areas and allocated sites.  Other than
relatively minor and ancillary parts of the proposal (i.e. the open space and outdoor
recreation areas) none of the proposed development is of a type requiring a “non-urban
location”.  Whilst the applicant seeks to justify the development on the basis that the large
storage / distribution plots have a specific locational need and that the development as a
whole would have significant economic benefits, as discussed elsewhere in this report these
arguments are not accepted.  The large storage / distribution units are not considered to be
of a type / scale that could not be accommodated elsewhere, and in any event these form a
relatively small part of the overall proposal.  Such economic benefits as might arise from the
proposal would be no greater than that arising from similar housing or industrial development
on allocated or otherwise preferable sites and the need for additional greenfield land within
the Green Belt has not been demonstrated.  The accessibility of the proposed development
Page 62 of 90

Page 63

by sustainable modes of transport is also considered to be unsatisfactory. 
10.128 In terms of the proposed local centre and other retail, food and drink floorspace, the policy
confirms that any such development must also satisfy with Town Centre First objectives and
accord with the sequential approach which prioritises existing centres over the construction
of new out-of-centre retail (etc.) development.  This has been discussed in relation to NPF4
policies 27 and 28 above, and these elements of the proposal cannot comply with the
policy’s requirements because the wider development to which they are intended to be
ancillary is itself contrary to the development plan, meaning that there is no justification for
retail or other town centre type development on this site. 
10.129 Taken as a whole, the proposal is incompatible with the purpose of the Green Belt and would
result in the unjustified loss of a sizeable and important section of the Green Belt.  The
proposal is therefore significantly contrary to LDP Policy PP4. 
10.130 NLLDP Policy AD 4 (Green Belt – Amount of Development) sets out criteria for assessing the
amount of development proposed within the Green Belt.  Proposals exceeding the specified
threshold require to be assessed for their implications.  Thresholds relevant to the current
proposal are: 
Use Class Assessment Threshold
Housing All development other than houses required to support a
Green Belt appropriate use
Business, Industry, Storage
and Distribution
All development (which shall also be subject to an
assessment of appropriateness under policy PP4)
Shops, Services, Food and
Drink
All development (which shall also be assessed in terms of
impact on existing centres and subject to a sequential
assessment)
Non-Residential Institutions
(e.g. Schools), Assembly and
Leisure (e.g. Sports
Facilities), Hotels, Hostels,
Residential Institutions (e.g.
Care Homes)
All development (which shall be subject to a sequential
assessment) 
Assessments shall include (but shall not be limited to): 
• A statement on whether the proposal is an intensification of an existing use;
• Consideration of its impact on planned land supplies, including housing land supply
where more than 10 units are proposed; and
• Evidence regarding the existence of suitable alternative sites. 
10.131 Policy Assessment: The proposal involves up to 980 houses which are not related to any
existing or proposed Green Belt-appropriate uses, and which as discussed under NPF4
policy 16 are not needed to meet an identified local housing land requirement.  The proposed
industrial / storage and distribution development is not intended to be used for Green-Belt
appropriate businesses, and as discussed under Policy PP4 it is not supported by the
assessment of appropriateness under that policy.  As discussed above the local centre uses
cannot be justified in circumstances where the residential and industrial development that
they are intended to serve is itself unjustified, and the scale of development proposed is also
considered to be inappropriate in terms of its impacts on existing centres, with no proper
sequential justification having been demonstrated for requiring the amount of floorspace
proposed.  Ancillary community-type uses such as the school campus or a health centre
could only be justified if these were shown to be necessary and no sequentially preferable
Page 63 of 90

Page 64

site was available, and as the need for new schools arises in large part from the
development itself this does not amount to a justification for these facilities being needed on
this particular site.  The proposal is not an intensification of any existing countryside use, and
it seeks speculative development beyond the requirements of planned land supplies.  Under
the circumstances it cannot be demonstrated that there is a need for the development and a
lack of suitable alternative sites.  Accordingly, the proposal is significantly contrary to LDP
Policy AD4. 
10.132 NLLDP Policy CI (Contributions to Infrastructure) indicates that the council will seek to
secure developer contributions for new developments that, individually or cumulatively,
generate a requirement for new or enhanced infrastructure or services. Contributions may be
required for affordable housing, education, transport, green infrastructure, amenity space
and play facilities. 
10.133 Policy Assessment: As discussed above the proposal would give rise to education capacity
issues and the need for off-site road works and supported public transport, which would
require a planning obligation covering developer contributions and the developer’s
responsibility for off-site work.  Within the site, green infrastructure including amenity spaces
and play areas would be provided as part of the development and the specifications and
management arrangements for these would require to be agreed as part of future
applications for approval of matters specified in conditions.  There is no policy requirement
for a proportion of the development to be affordable housing in this area, however the
applicant proposes to provide this voluntarily.  Subject to an appropriate planning obligation
and conditions the proposal would comply with LDP Policy CI. 
10.134 NLLDP Policy EDQ 1 (Site Appraisal) requires that any proposed development be appraised
in terms of the site and its surroundings to ensure that it will integrate successfully into the
local area and avoid harm to neighbouring amenity.  Applications are to be accompanied by
documents sufficient to demonstrate that all relevant matters have been taken into account in
the design, and to allow the appraisal of the proposal. 
10.135 Policy Assessment: The proposal contains the level of information appropriate for an
application for Planning Permission in Principle (PPP), and it is considered that all relevant
matters have been taken into account.  Whilst opinions may differ as to the overall
acceptability of the application, the applicant has carried out a thorough site appraisal which
has informed the proposal.  Further assessment of detailed design proposals would occur at
the approval of matters specified in conditions (AMSC) stage if permission were to be
granted, and such proposals would be expected to reflect the site appraisal which has been
undertaken.  The proposal therefore meets the requirements of LDP Policy EDQ 1. 
10.136 NLLDP Policy EDQ 2 (Specific Features for Consideration) details specific hazards and other
technical matters which require special assessment, including flood risk, contaminated land,
ground stability, utility pipelines and environmental management areas.  Applications for
planning permission are required to be accompanied by documents demonstrating that the
proposal is acceptable in these respects. 
10.137 Policy Assessment: The application is supported by a set of documents covering the relevant
technical matters to a standard appropriate for a PPP application of this nature.  These
documents include an Environmental Statement with chapters covering water resources and
flood risk, ground conditions, noise and air quality, along with supplementary technical
information on flood risk.  The information supplied is considered to be satisfactory by the
relevant technical consultees, who consider that these issues could be addressed by
conditions in the event of the application being approved.  Additional survey work and
detailed mitigation proposals (where applicable) would be addressed at the AMSC stage. 
The proposal therefore meets the requirements of LDP Policy EDQ 2.
Page 64 of 90

Page 65

10.140 NLLDP Policy EDQ 3 (Quality of Development) indicates that development will only be
permitted where high standards of site planning and sustainable design are achieved. 
Applications are required to demonstrate that the proposal takes account of site appraisal,
technical and protected asset policies as listed above and achieves a high quality of
development, including delivering a safe, pleasant, inclusive, convenient and welcoming
place, being adaptable, sustainable and well integrated with public transport, green networks
and wider links.  Developments should contribute to the move towards a low-carbon
economy and promote health and well-being, amongst various other requirements.  The
policy also covers mitigation of any air quality or noise issues, protection of water bodies,
provision of adequate drainage, maintenance of landscaped areas and protection of green
network and historic environment assets, all of which have already been discussed above. 
10.141 Policy Assessment: As this is a PPP application only, the detailed design would be a matter
for subsequent AMSC applications.  The proposal has been assessed against the qualities of
successful places under NPF4 Policy 14 above, which are broadly similar to the
requirements of policy EDQ3, and it is concluded that although the proposed development
would be well designed and should provide a pleasant, high quality environment, this cannot
overcome the adverse impacts on local amenity which would arise from the loss of this
important section of the Green Belt, the inherent unsustainability of developing a large area
of greenfield land without a clear locational need or land supply justification for doing so, and
the shortcomings of the site in terms of sustainable transport.  Accordingly, the proposal is
on balance considered to be contrary to LDP Policy ENQ3. 
11. Environmental Impact Assessment 
11.1 The application has been subject to an Environmental Impact Assessment (EIA), which was
originally carried out in accordance with a scoping exercise dating from 2016.  It was
therefore undertaken in accordance with the requirements of the Environmental Impact
Assessment (Scotland) Regulations 2011, which have since been superseded by the
equivalent 2017 Regulations.  As this EIA was undertaken under the earlier regulations some
of the procedures and terminology differ slightly from current practice – for example the
report of the EIA was known as an Environmental Statement (ES) rather than an EIA Report. 
The ES has been updated to reflect the changes to the proposal, updated surveys, and other
changes (such as new legislation and committed development with which there might be
cumulative impacts).  The ES seeks to predict the significance of the environmental effects of
the proposal using a consistent scoring methodology, and each impact is assessed using
two factors: 
• The sensitivity of the environmental receptor (i.e. its importance and whether it is capable
of absorbing change without fundamentally altering its present character).  Sensitivities
are categorised as high, moderate or low.
• The magnitude of the impact which is likely to take place, categorised as major,
moderate, minor or negligible.  (Such impacts may be either adverse, neutral or
beneficial) 
This results in impacts being given a significance rating as follows: 
High Sensitivity Moderate Sensitivity Low Sensitivity
Major Magnitude major major/moderate moderate/minor
Moderate Magnitude major/moderate moderate/minor minor
Minor Magnitude moderate/minor minor minor/negligible
Negligible Magnitude negligible negligible negligible
Page 65 of 90

Page 66

11.2 Whether or not an impact is judged to be a “significant” environmental impact as defined in
the EIA regulations is a matter of judgement, but typically major or major/moderate impacts
will be significant, moderate/minor impacts might be significant depending on the issue, and
the cumulative effect of a large number of minor impacts can also be significant.  The ES
assesses impacts during the construction phase (i.e. actually building the development,
including vegetation clearance and planting of new landscaping) and during the operational
phase (i.e. after the development has been built and brought into use, including long-term
effects such as the new landscaping growing to maturity).  Cumulative impacts with other
developments in the area are also considered. 
11.3 In terms of Landscape and Visual Effects, the site lies within the Clyde Basin Farmlands
regional character area (RCA) as defined in the Glasgow and Clyde Valley Landscape
Assessment (SNH, 1999) which comprises much of the lowland area of the Clyde Basin
surrounding the Glasgow urban area.  Many areas within this RCA have been subject to
mineral working or industrial development, resulting in areas of derelict or damaged land.
Applying National Character Areas, the centre of the site falls within category STC8 “Incised
River Valleys” while the higher ground is STC7 “Fragmented Farmlands”.  The ES concludes
that the development would have the following impacts: 
• Impact on agricultural fields including the irreversible alteration of land use would result in
a major adverse landscape impact during the construction phase, however in the longer
term new planting would soften this impact to moderate adverse during the operational
phase;
• Loss of existing hedgerows and tree belts to accommodate construction would be kept to
a minimum so would have a moderate adverse landscape impact during construction, but
this would be offset by a large amount of new landscaping implemented as part of the
development, resulting in a minor beneficial residual effect in the operational phase;
• Impact on Ancient Woodland and woodland subject to tree preservation orders would be
of small magnitude as only 3.54% of the woodland would be affected, but the value of
this woodland is high so the effect during construction is assessed as moderate adverse.
Again, new planting would over time soften the residual impact to minor adverse;
• Impact on other woodland would initially be moderate adverse due to the loss of 2.54
hectares of young woodland, but over time the significant amount of new planting would
result in a minor beneficial residual landscape impact;
• There are seven ponds on the site (Lily Pond and six smaller ponds) which would be
retained, with enhanced maintenance.  As such the construction phase impact on the
ponds is assessed as negligible adverse shifting to negligible positive during the
operational phase;
• Impact on the landscape of the North Calder Water would include a new road bridge and
a new pedestrian bridge, resulting in a moderate adverse impact during construction. 
Over time green network improvements and maintenance would result in a
moderate/minor beneficial residual effect;
• Similarly, impact on the landscape of the Monkland Canal is assessed as moderate
adverse during construction but would soften to a minor adverse residual effect once
landscaping and maintenance improvements were in place.  (This difference being due to
the new canal bridge being a modern feature over a historic waterway);
• Impact on High Palacecraig (listed building) would not involve direct effects on the
building itself, but there would be indirect effect on its setting, assessed as a moderate
adverse impact during construction and softening over time as new landscaping matures
to a minor adverse residual effect; 
• Impact on the existing unlisted buildings within the site would be of large magnitude
(assuming these would be demolished), but these buildings are of little historic or
architectural value.  The impact during construction is therefore assessed as moderate
Page 66 of 90

Page 67

adverse, softening to a minor adverse residual effect;
• The impact on the Woodhall House scheduled monument is limited by the fact that the
buildings no longer exist and the designed landscape has been much altered over the
years, so the effect is assessed as moderate/minor adverse during construction, with
new landscaping and maintenance resulting in a minor/negligible beneficial impact in the
operational phase;
• Impact on the walled garden within the Woodhall House estate would be neutral during
construction as no works are proposed which would directly affect it, however improved
maintenance would have a minor beneficial impact in the longer term;
• Impact on the landscape of the road network is similarly assessed as minor adverse
during construction, shifting to negligible beneficial in the operational phase as a result of
new landscaping;
• Impact on overall landscape of the site and its immediate setting is assessed as
major/moderate adverse during construction, but over time new landscaping is assessed
as improving the appearance of the site resulting in a minor beneficial residual impact;
• Of the two landscape types within the site (as defined by the site context plan), the
proposal; the initial moderate adverse impact is assessed as softening to negligible
beneficial (in the case of “North Calder Fragmented Farmlands”) and minor beneficial
(“North Calder Water Incised River Valley”);
• Based on assessments of the impact on 29 receptors (i.e. residents, road users, part
users, etc.) at 24 viewpoints around the site, significant impacts on visual amenity
(moderate or major adverse) are considered likely to occur for seven receptors during the
construction phase, but in the operational phase these would soften to (at worst)
moderate/minor adverse.  The receptors most affected are residents’ view south from
Calderbank Road in the vicinity of Credon Drive/Ayr Drive (where the view of open
countryside would be replaced by housing, albeit with new landscaping), and the 360°
view of path users from the canal towpath in the centre of the site (where the new road
bridge would be located and where views of countryside would be replaced by housing
and new landscaping);
• Taking account of the approved Mossend International Railfreight Park, an approved
industrial site within Eurocentral, and a small brownfield site allocated for housing at
Sykeside Road, the ES concludes that there would not be any significant cumulative
landscape impacts. 
11.4 It is considered that the Environmental Statement’s conclusions in respect of landscape and
visual impacts are reasonable and in most respects the values given are accepted. The ES
recognises that there will be significant adverse impacts on the overall landscape and setting
of the site, on the fields and woodland areas, watercourses and heritage features during and
immediately after construction, but concludes that once the intended new landscaping,
woodland planting and improved maintenance regime have become established the impacts
will all be reduced substantially and in some cases will result in minor beneficial changes to
the landscape, leading the ES to conclude that the only significant long-term residual impact
would be the loss of the open fields.  However, the assessment of landscape impact is
inevitably somewhat subjective and while the Planning Service concurs with the generality of
this assessment, it is considered that the mitigating effects of the new landscaping etc. are
given too much weight.  This would not compensate for the loss of so much of the current
attractive green space between Carnbroe, Airdrie and Calderbank and the permanent loss of
the open field system as well as the remaining parts of the designed landscape which
characterise the current landscape.  It is also intended that some of the proposed storage /
distribution / industrial buildings would be very large, which would further impact on the
existing landscape.  The Planning Service therefore considers that there would be a
significant adverse impact on the landscape in these respects. 
Page 67 of 90

Page 68

11.5 In terms of Ecology and Nature Conservation, the baseline study identifies multiple habitat
types across the site, of which the greatest impacts of the development would be on semi-
improved natural grassland (100% to be lost), unimproved natural grassland (51% lost)
marshy grassland (44% lost) and dense/continuous scrub (33% lost).  Of the plantation
broadleaved woodland 9% would be lost, while only 1.5% of the land designated as Sites of
Importance for Nature Conservation (SINCs) would be affected.  Protected species present
include bats, badgers and great crested newts.  It is indicated that best practice working
methods would be employed during construction, including appointing an Ecological Clerk of
Works, undertaking updated surveys as necessary, and following a Habitat Management
Plan, and the detailed design would incorporate many wildlife-friendly features.  Significant
ecological effects are defined as those which support or undermine biodiversity conservation
objectives for important ecological features (IEFs) or biodiversity in general. The ES
concludes that the development would have the following impacts: 
• No nationally designated ecological or nature conservation sites would be affected by the
proposal;
• Locally designated sites (i.e. the six SINCs within the site and those in the surrounding
area) would have little direct impact from the development as these areas would be
retained, but they would be subject to a minor adverse impact due to disturbance during
construction.  However most such impacts would be reversable.  In the operational phase
there would likely be an increase in recreational use of these areas but the impact of this
is assessed as negligible adverse.
• Some 28 different habitat types have been identified within the site, of which the following
are considered to be of importance: 
i. Semi-Natural Broadleaved and Mixed Woodland.  Of around 58.6ha of this habitat,
around 1.54ha (5.25%) would be lost, which would result in a minor adverse impact
during construction.  However the planting of 27.5ha of new woodland would in due
course result in a minor beneficial impact.  Increased recreational use of the
woodland following completion of the development would have a negligible adverse
impact;
ii. Ancient Woodland.  Of 25.0ha of woodland listed in the ancient woodland inventory,
0.87ha (3.4%) would be lost.  The quantity and proportion of such woodland lost
would be relatively small so this is assessed as a minor adverse impact, but this
effect would be irreversible and not mitigated over time.  These areas would not
contain paths so the operational phase is unlikely to increase recreational use and the
residual impact is assessed as negligible;
iii. Species-Poor Hedgerow (i.e. hedgerows of limited importance as habitats).  The
proportion of such hedgerows lost has not been quantified but given their limited
value the effect would be minor adverse during construction and negligible in the
longer term;
iv. Standing Open Water: All such areas would be retained however there is a risk of
pollution during construction (from runoff etc.), and were this to arise there could be
minor adverse impacts, albeit that mitigation measures would be designed to prevent
such an occurrence and any such effects would likely be reversible.  New SUDS
ponds would be constructed as part of the development which would have a minor
beneficial ecological impact.  Operational phase impacts would be negligible;
v. Watercourses: Greenspace corridors would be retained along the Monkland Canal
and North Calder Water to retain safe passage for fauna, although new bridges could
result in accidental pollution during construction and/or creation of barriers to wildlife
movement.  Such impacts would be minor adverse.  In the operational phase there
would a very slightly raised risk of pollution or siltation which is assessed as negligible
adverse;
• Some non-native invasive species are present on the site and there is a risk of these
Page 68 of 90

Page 69

being spread by construction activities which would be a minor adverse construction
impact, with a negligible residual impact;
• Bluebells are found within semi-natural woodland and some would be lost within the
areas of woodland to be removed, though these areas are small.  There would be a risk
of hybridisation with non-native bluebells if these were included in the new landscaping. 
Such impacts would be minor adverse in the construction phase, becoming negligible
adverse in the operational phase;
• Six active badger setts are located within the site, two of which would be within 30m of
areas of proposed development, and the construction activity may cause disturbance and
potentially abandonment of these setts and a badger license with mitigation may be
required. Development of grassland would result in loss of foraging habitat, however the
new woodland planting would help to compensate for these effects.  The construction
phase impact on badgers is therefore assessed as minor adverse.  In the operational
phase the increased human presence would increase disturbance and there would be an
increased risk of road casualties especially as some proposed roads are close to setts,
and this would make the site less attractive as badger habitat however it is not likely that
the size of the badger population in the wider area would be significantly affected.  The
impact is therefore also assessed as minor adverse.
• No otters were recorded on the site but the watercourses would provide suitable habitat,
and the proposal would retain these.  Construction activity would cause temporary
disturbance and new bridges could lead to barriers to movement, which would be minor
adverse impacts, while longer term impacts would be negligible;
• No bat roosts were found in the areas of woodland likely to be directly affected by the
proposed development, although re-surveying would be needed before development. 
Some of the trees affected would be suitable for bat roosting but as only around 5% of
the semi-natural broadleaved woodland would be lost the impact on local bat populations
would be small.  Surveys have found evidence of use of the site by the relatively rare
Leisler’s bat, but this appears to be for foraging or commuting rather than roosting, and
Leisler’s bats avoid open areas so the loss of over fields is not likely to affect them. 
Other bat species recorded on the site (common pipistrelle, soprano pipistrelle,
Daubenton’s bat) also favour woodland or riparian foraging habitat, and may benefit from
the creation of new woodland edge habitats as a result of the proposal.  However this
would be offset by the adverse impact of additional artificial lighting.  The overall impact
on roosting bats is assessed as insignificant, but the effect of construction on foraging
bats would be minor adverse. Over time as new landscaping reaches maturity and bat-
friendly features in new buildings (e.g. bat bricks) the impact would become minor
beneficial;
• Surveys for great crested newt (GCN) were carried out at 13 ponds within the site or
within 500m of its boundary.  Of these, six ponds were either no longer present or were
assessed as being of low suitability as newt habitats. Testing for GCN environmental
DNA (eDNA) at the remaining seven ponds revealed no trace of GCN in four of these,
inconclusive results and two, and GCN eDNA at one pond.  This, and one of the
inconclusive ponds, were assessed as having high suitability for amphibians and
although detailed surveys did not observe GCN they did have frog and toad populations.
Further surveys would be required before construction but given the proposal’s limited
impact on standing open water habitats it is not anticipated that there would be any
significant impact on GCNs;
• The construction phase would result in removal of a small percentage of the woodland
and clearance of scrub and field margins which would result in disturbance to nesting
birds, however such work ought to take place outwith nesting season to minimise this,
and new planting is likely to compensate for habitats lost.  In terms of wintering birds the
main impact would be the loss of fields and field-edges used by thrush species (e.g.
redwing and fieldfare), though this impact would be minor in the context.  There would be
no significant effect on foraging geese.  The impact of the construction phase on nesting
Page 69 of 90

Page 70

and wintering birds is therefore assessed as minor adverse.  The operational phase
should have a negligible effect on birds. 
11.6 The Planning Service generally concurs with the conclusions of the ES in respect of Ecology
and Nature Conservation.   The site is large and contains a range of different habitats, but
the survey results and mitigation proposals indicate that none of the impacts are likely to be
significant in EIA terms.  This does not mean that there will not be any adverse impacts, as
clearly the proposal would involve substantial changes to the area which would inevitably
impact on wildlife, but either the scale of impact is small or the receptors are not particularly
sensitive (in terms of scarcity or ecological importance).  More detailed surveys would be
required to support applications for approval of matters specified in conditions, however it is
considered that the ES demonstrates that the impact on the natural environment would be
acceptable for a development of the type proposed. 
11.7 It should be noted that in addition to the species discussed above there would potentially be
adverse impacts on various non-protected species of wildlife, however these impacts would
not normally be defined as significant in the context of an Environmental Impact Assessment. 
Non-protected species raised by objectors include roe deer, which often graze in fields
around woodland edges that would be developed as a result of the proposal, and they may
be disturbed by increased human activity in the woods.  However, they would benefit from
increased woodland planting and are an adaptable species which is capable of taking
advantage of semi-urban habitats.  Roe deer are locally abundant so the impact on them is
not considered to be significant.   
11.8 In terms of Cultural Heritage and Archaeology, the baseline identified 52 heritage assets
within 1km of the site.  The most notable of these assets are the Monkland Canal, Woodhall
House, High Palacecraig house (all nationally designated) and the earthworks of Crogals
Castle (non-designated but regionally significant).  The other heritage assets (most of which
are industrial or mining-related features) are all assessed as being of local or lesser
importance and of low or negligible sensitivity.  The ES concludes that subject to the
intended mitigation measures, the development would have the following impacts: 
• Direct impacts on the Monkland Canal would arise from the new bridge, which is
assessed as having a potential moderate adverse effect during the construction phase,
though the detailed bridge design would be expected to be sympathetic to the canal. 
Additionally, repairs to existing bridges and abutments (which form part of the scheduled
monument) would have moderate beneficial effects.  New development would take place
on the land surrounding parts of the canal, although a minimum 20m buffer and the
present tree-lined character of the canal would be retained, and new landscaping has
potential to be attractive.  The operational phase is therefore assessed as having a
moderate/minor adverse effect on the canal;
• The proposal would introduce new development to the surviving parts of the parkland
surrounding the remains of Woodhall House, although most of the structural remains of
the designed landscape (i.e. the walled garden, ornamental land and most of the ha-ha)
would remain, as would most of the woodland and some of the surviving industrial
features (e.g. colliery bings and railways) which are also part of the history of the estate. 
The legibility of the Woodhill House estate and its history would therefore survive to some
extent, although the parkland character of the designed landscape would be lost.  The
ES assesses the proposal as having a major/moderate effect on the setting of Woodhall
House; 
• The proposal would breach a ha-ha which is a notable feature of the former designed
landscape.  However the ha-ha’s importance lies in it being an integral part of the wider
designed landscape, and as that designed landscape is non-designated and degraded by
Page 70 of 90

Page 71

previous development the impact on the ha-ha is also assessed as a minor/negligible
adverse effect;
• The impact on the ice house feature is not known at this stage but it seems probable that
the feature might need to be destroyed.  However the ice house is categorised as a low-
sensitivity receptor so its loss would be classed as a moderate/minor adverse effect
during the construction phase.  Archaeological work would be expected to document any
remains before they were removed;
• Palacecraig House would have new development built around it, although the masterplan
seeks to protect the vista between the front of the house to the Monkland Canal, and new
landscaping would also mitigate the impact.  The impact on the setting of Palacecraig
House is therefore assessed by the ES as moderate/minor adverse;
• Nationally designated heritage sites outwith the site boundary, including the Calderbank
Iron Works scheduled monument, the B-listed Cairnhill Stables, and the C-listed
Calderbank Parish church would be subject to negligible effects;
• Crogals Castle and other known archaeological features adjacent to the North Calder
Water south of Calderbank would not be affected by the proposal and would be
preserved in situ.  
• The only potential cumulative impact on cultural heritage which has been identified is
that, when combined with existing permissions for housing at Carnbroe, the proposal
could result in an adverse effect upon remains of an historic ironstone mine. However as
the surviving parts of the mine which lie within the site are spoil heaps within woodland
areas which are to be retained, these should not be affected.  
(It should be noted that the ES contains some inconsistencies arising from amendments to
the proposal not fully having been taken into account in the revised ES, but the above
conclusions are understood to reflect the current proposal). 
11.9 The Planning Service’s assessment of the proposed impacts on cultural heritage and
archaeology has been discussed in relation to NPF4 Policy 7, and concluded that the
proposal would have locally significant adverse impacts upon the setting of the Monkland
Canal, Woodhall House and High Palacecraig.  That conclusion is considered to be
consistent with the conclusions of the ES, which assessed the impacts on the setting of the
canal and High Palacecraig as “moderate/minor” and on the setting of Woodhall House as
“major/moderate”. 
11.10 In terms of Socio-Economic Impacts, guidance on environmental impact assessment
recognises the importance of impacts on human or community health and welfare, including
matters such as employment and economic conditions, and the availability of recreation and
open space, amongst other factors.  The ES focuses on economic impacts and identifies the
baseline conditions in North Lanarkshire, which include localised areas of deprivation and
higher than Scottish average unemployment, but also higher than average earnings for those
who are in employment.  In terms of employment the significance of effects is assessed in
terms of its overall impact on the local economy, thus creating a limited number of new jobs
might be classed as a minor beneficial effect, though of course the benefits to the individuals
concerned may be considerable.  The ES assesses economic impacts as follows: 
• Temporary construction employment during the implementation phase of development is
estimated as providing 257 full time equivalent (FTE) jobs.  (Note that in this context ten
temporary jobs are deemed to equate to one FTE job).  This is assessed as having
moderate/minor beneficial effects.  Related effects in terms of training and skills,
reduction in unemployment and expenditure in local services are also categorised as
minor or moderate/minor beneficial, being essentially temporary though with some
residual benefits (e.g. persons gaining skills while working in the construction would
retain these skills and therefore gain enhanced employability);
Page 71 of 90

Page 72

• Upon completion of development, the ES estimates that it would create around 1,851
additional local FTE jobs (this calculation being discussed below). Such a number is
assessed as a moderate/minor beneficial impact in terms of the wider North Lanarkshire
economy.  The related increase in training/skills opportunities and reduced
unemployment are assessed as minor beneficial effects;
• Estimated Gross Value Added (GVA – i.e. the economic output of businesses on the site,
minus input costs) of £12.8m per annum, assessed as a minor beneficial effect on the
North Lanarkshire economy;
• Generation of around £7.4m per annum of additional council tax revenue from the new
properties, assessed as a minor/negligible beneficial effect;
• Creation of around 245 affordable and 735 market homes for sale, assessed as having a
minor beneficial effect on the local housing market;
• Generation of an estimated £56.5m per annum in additional household disposable
income, a percentage of which would be spent locally, and which is assessed as a minor
beneficial effect on the local economy;
• Cumulatively, along with two previously consented developments at Eurocentral, it is
estimated that the construction phase for the three projects would provide 293 FTE
construction jobs (equivalent to 1.8% of the construction labour force in North
Lanarkshire), and that if all three were fully developed the resultant gross permanent
operational jobs (2,687) would equate to 1.6% of the total number of persons in
employment in North Lanarkshire, which in itself is assessed as a moderate/minor
beneficial effect.  However the ES also notes that 2,687 jobs equates to 44.9% of the
number of people in North Lanarkshire categorised as both ‘unemployed’ and ‘wanting a
job’, which it assesses as a major/moderate beneficial cumulative effect. (Note, however,
that the gross permanent operational jobs would not all be “new” jobs).   
11.11 The Socio-Economic Impact Assessment estimates operational phase (i.e. permanent) FTE
employment arising from the proposal as set out in the table below. The three measures
used are: 
• gross direct jobs  (all jobs within the development, for example people employed at the
proposed industrial units and shops);
• net local jobs  (the net number of additional jobs which are taken up within the local
Travel To Work Area, taking account of existing jobs relocated to the site, jobs which
would have been created anyway, jobs created but taken up by people from outwith the
local area, and new jobs created locally as an indirect ‘downstream’ effect of increased
economic activity); and
• net Scottish jobs (the net number of additional jobs across Scotland as a whole)   
Gross Direct Net Local (NLC) Net Scotland
General Industrial Units 796 484 766
Storage and Distribution Units 1057 1091 1617
Ancillary Retail etc. Area 33 51 76
Local Centre 100 176 260
Primary School 28 49 73
Total 2014 1851 2792 
11.12 These figures are at first glance impressive, however it is considered that they should be
taken with caution. The estimates for permanent employment are based on industry-
standard calculations that new floorspace for different uses will result in a certain ratio of jobs
per square metre, with different deductions and multipliers for each type of use and taking
account of local factors.  This methodology accords with guidance, but even so the estimates
it produces are inevitably something of a ‘rule of thumb’ as employment will vary significantly
between different employers, and as this application is speculative it is not known what
Page 72 of 90

Page 73

employers might emerge to occupy the proposed units.  As noted above, the proposed
floorspace figures for the employment units are themselves estimates, and the Planning
Service considers that they are somewhat optimistic given the constraints of the site,
including the shape and contours of the plots.  If practical considerations meant that these
units had to be smaller, then the estimates for the number of jobs created would also shrink
proportionately.  Even if the gross employment in the development did prove to be close to
the estimate, the variables applied to estimate net new employment (i.e. the actual number
of new jobs created as a result of the development) might still result in the net employment
benefit being significantly lower than the estimates. 
11.13 The estimates for general industrial floorspace assume a 25% “displacement” (i.e. a quarter
of the jobs would be relocated from elsewhere in the local area, for example if an existing
firm relocated to the site and vacated its existing premises), while for other types of
floorspace a lower displacement rate is used.  For all floorspace a standard 10%
“deadweight” is assumed (i.e. whilst these might be “new” jobs they would have been
created anyway even if the proposed development had not happened, for example because
the employer would have gone to a different site instead).  Thus it will be seen that the
applicant’s estimates predict that around two thirds of the jobs in the general industrial units
on the site will be completely “new” jobs which would not be created if the proposal did not
happen, and for other types of floorspace (e.g. the storage and distribution) this figure is
higher still.  However, to reiterate, it is not known which firms might occupy the proposed
units, and as these would comprise a small number of large units the estimates for
displacement and deadweight could proved to be very different.  For example, some 689 of
the predicted gross direct jobs would arise from the larger of the storage and distribution
units and the low displacement rate used implies that this would be an inward investor, but if
the business which would occupy that unit would otherwise have found an alternative site the
deadweight rate would be 100%, meaning that the net new jobs figures arising from that
floorspace would effectively be zero.  That one change would eliminate over a third of the net
additional jobs estimated to arise from the whole development.  It will be appreciated that
any inward investor actually proposing to create 689 new jobs in the Central Belt would
receive strong encouragement from the relevant authorities who would work with them to find
a suitable site, and there is little reason to assume the application site would be the only
viable option.  The same would also apply to the other storage and distribution and general
industrial units, which might very easily be occupied by businesses with a much higher
displacement or deadweight factor than the applicant’s modelling assumes. 
11.14 The methodology used to estimate employment benefits is widely used, but it is not above
challenge.  The estimate includes 28 jobs directly provided by the proposed new primary
school, and the high (260%) “multiplier” factor used for education jobs mean that the net
additional jobs figure for Scotland is calculated at 73.  However, in practice the pupils
attending the new school would be displaced from other schools elsewhere.  As it is
impossible to know where the families moving to the new housing will come from or who will
occupy their present / alternative homes it follows that the upstream impact on their previous
schools is also impossible to calculate, but ultimately there will be no additional children in
the Scottish education system, and in some schools there will be fewer children which may
enable staffing reductions (i.e. displacement of employment).  The employment estimate
therefore takes full account of potential downstream impacts while not taking account of the
upstream impacts which offset them.  The Planning Service therefore does not agree that
there is likely to be any measurable net increase in education employment or in downstream
impacts that could result in the predicted 73 net additional jobs across Scotland. 
11.15 The employment estimates also predict 133 FTE direct jobs in the new local centre and in
the ancillary retail / food & drink floorspace, rising to 336 net additional jobs once the
multiplier is applied.  Although the local centre floorspace is not defined in the application,
the employment calculations appear to be based on 2,000sq/m (plus 650sq/m for the
Page 73 of 90

Page 74

ancillary floorspace within the industrial area).  Again, it is not known what uses would
occupy the new floorspace so it is impossible to verify whether the displacement and
deadweight ratios used are realistic, but as discussed in relation to NPF4 policies 27 and 28
it is possible that some of the anticipated uses would conflict with Town Centres First and
retail policies, in which case it would not be desirable to provide that level of floorspace. 
There is also the potential that, as with education, the displacement factor may be
understated simply because it is impossible to calculate – e.g. even if a new local
convenience shop was provided on the site to serve the residents in the new houses,
ultimately the people who would live in the new houses will have moved from somewhere
else, with little or no measurable increase in their net convenience retail expenditure and
consequently very little net impact on the amount of retail employment across the area. 
11.16 Clearly any net increase in local jobs would be an important benefit, especially as these jobs
would be accessible to communities with elevated unemployment rates.  However, as
explained above the methodology used to estimate employment benefit is guaranteed to
predict a large number of new jobs because a large amount of new floorspace is proposed,
but the Planning Service does not consider that this estimate is likely to prove accurate even
if the full extent of the proposed employment uses were actually to be developed (which is
itself subject to doubt).   
11.17 As regards the temporary construction employment, the estimated figures (i.e. around 2,570
temporary jobs of various durations at different points in the construction process, roughly
corresponding to 257 FTE jobs), these figures are based on typical employment in
construction projects of this nature and are therefore considered to be a reasonable
estimate.  However, similar levels of construction employment would arise from developing a
like amount of housing and commercial floorspace on other sites.  Allowing the development
of such a large quantity of new housing and commercial floorspace on an unallocated and in
some respects unsatisfactory site would inevitably soak up local demand for such
accommodation and thus reduce the likelihood of new housing and commercial development
taking place on other (potentially more appropriate) local sites.  Therefore, at least some of
the construction jobs would also arise from displacement, for which the applicant’s estimates
do not include any allowance.  It is therefore considered that the net benefit of employment
during the construction period is also overestimated. 
11.18 The Planning Service therefore does not accept the conclusions of the Environment
Statement in respect of the socio-economic benefits of the proposal, as it is considered that
the number of actual “new” jobs which are likely to be created by the proposal is likely to be
significantly lower than the ES estimates.  Consequently other economic benefits such as the
Gross Value Added and the impact on local unemployment would also be less significant
than the ES predicts.  The estimated increase in council tax revenue is also considered to
make insufficient allowance for displacement.  Inasmuch as the proposal would undoubtedly
create some new jobs and that these would be of benefit to the local community, it is
considered that the proposal would only have a minor beneficial socio-economic impact, and
that this benefit would itself be partially offset by a reduced likelihood of similarly
economically beneficial development taking place at preferable locations as a result of the
proposal.  The socio-economic impact of the proposal is therefore not considered to be
significant. 
11.19 In terms of Traffic and Transportation Impacts, the ES assesses the environmental impacts
of the proposal in respect of six factors: 
• Severance (i.e. the perceived division of a community when separated by new roads or
increased traffic flow).  Existing severance levels around the site are assessed as high
due to traffic flows on the B802, Sykeside Road and connections.  To the south the
Page 74 of 90

Page 75

motorway forms an absolute barrier, and existing severance levels on the B799 crossing
the motorway bridge are also very high due to traffic levels.
• Non-Motorised User Amenity (i.e. changes to the pleasantness of journeys by foot,
wheelchair or bicycle)
• Fear and Intimidation (as might be experienced by road users due to traffic speed, etc.)
has been assessed using a scoring that takes account of traffic flow, HGV traffic flow and
average speed.  It is currently assessed as “moderate” in most of the main streets around
the site, again due primarily to existing traffic levels. 
• Road Safety (covering existing and estimated accident rates).  Recent (2018-22)
personal injury collision data for the area around the site is assessed as being typical for
urban roads of this nature and no underlying road safety issues are evident.  Those
accidents which involved pedestrians or cyclists occurred at different locations with no
clustering, and did not occur close to the proposed new junctions.
• Driver Delay relates to the amount of additional time drivers (and passengers) in motor
vehicles take to complete their journeys as a result of the proposed development.  Such
delays might arise from additional traffic or new / revised road infrastructure causing
longer queues or reduced speed, and has an economic and social cost to society. 
Normally  driver delays would only be considered significant in situations where either an
extremely large number of drivers were affected, or where the length of delay was
excessive;
• Pedestrian Delay similarly relates to the additional time that pedestrians and other non-
motorised road users take to complete their journeys.  Reasons for pedestrian delay
might include inability to cross busy roads due to additional traffic, longer waiting times at
crossings or less direct walking routes.  Again, the significance of such delays is
assessed in terms of the number of people affected and the length of delay arising. 
11.20 Receptors considered include various transport infrastructure users (i.e. pedestrians,
wheelchair users, cyclists, public right of way users, motorists, freight vehicles, public
transport and emergency services) as well as other special interests (people at home or
work, sensitive or vulnerable groups, retail, recreation and tourist areas, and locations with
concentrations of vulnerable users or safety or capacity concerns).  The ES assessed the
effects of the proposal as follows: 
• During the construction phase the proposal would give rise to only minor increases in
traffic levels, not exceeding 2% on any local road.  However the increased traffic would
include a disproportionately high proportion of heavy vehicles, so the number of heavy
vehicles passing through Calderbank would increase by 10-13% during the construction
period, but that would amount to only around 5 extra 2-way movements per day.  South
of the proposed new Woodhall Mill Road junction to the B799/motorway junction heavy
vehicles would increase by 38% (15 two-way movements), however that section of road
has few pedestrians and the existing traffic flow through Calderbank is around 12,200
vehicle movements per day.  These temporary increases in construction traffic are
therefore assessed as negligible in respect of all seven factors.
• Predicted traffic levels for 2045 (after completion of the whole development, and when
compared to the predicted baseline level for that year) would vary across the local road
network.  Some roads are expected to see a drop in traffic due to the diversion of through
traffic onto the new spine road (e.g. Sykeside Road and Calderbank Road would see a
predicted 13-15% reduction in total traffic).  On the other hand the eastern section of
Paddock Street (immediately west of the junction into the proposed development) would
see a 22% increase in total traffic.  Guidelines indicate that changes of 30%, 60% and
90% are regarded as causing “slight”, “moderate” and “severe” increases in severance
respectively, although thresholds may be lowered to take account of the sensitivity of
receptors.  On this basis, five stretches of road are identified as having effects that
require detailed consideration:
Page 75 of 90

Page 76

(i) Paddock Street west of Sikeside Street, with a predicted 14% increase in daily
traffic, albeit with a reduction in heavy vehicle usage.  In this case there are
numerous sensitive receptors on this section of road (a primary school/nursery
campus, local centre, care home and church) so increases in traffic are of more
than usual significance, however the baseline level of severance on Paddock
Street is already considered “high”, and a 14% increase in traffic flow would
normally be considered the be negligible in terms of severance;
(ii) Woodhall Mill Road (B802) between the new spine road junction and the
B799/A8/B802 roundabout, with a predicted 65% increase in traffic movements,
including an 800% increase in heavy vehicle movements due to the proposed
industrial storage and distribution units.  Severance is assessed as rising from
“high” to “very high”, with the increase being “moderate”.  However, there are no
sensitive receptors on this stretch of road, and significant new road infrastructure
will be needed to install the new junction along with mitigation work at the existing
roundabout.  At the moment there are few reasons for pedestrians to cross this
road, but the proposal would create reasons to do so and therefore the junctions
would be required to include appropriate facilities for pedestrians and cyclists,
which would represent an improvement for these users and which would serve to
reduce the level of severance;
(iii) A8 connector road between A8/M8 Junction 6A north roundabout and the
B799/A8/B802 roundabout, where average daily traffic would increase by an
estimated 22%, including a 46% increase in heavy vehicle movements This is
assessed as “medium” rising to “high” severance, albeit that a 22% increase in
traffic is below the threshold for a “minor” impact on severance. This road has no
frontage or pedestrian footpaths though it has a pedestrian crossing, and
mitigation work at this roundabout would again be required to ensure safe and
convenient crossing facilities were provided;
(iv) South end of new spine road at the Woodhall Mill Road (B802) junction, where
the new road would have an estimated 11,200 daily traffic movements, resulting
in “high severance”.  However, as it would be a new road this would be designed
from the outset with pedestrian and cycle infrastructure appropriate for the level of
traffic anticipated.
(v) North end of new spine road near new Sykeside Road junction, where the new
road would have an estimated 6,800 movements, assessed as “medium”
severance”, but again incorporating appropriate infrastructure to address this into
the detailed design.
Overall, due to the nature of the roads affected and the proposals for mitigation the ES
concludes that the impact on severance would be negligible.
• Changes in non-motorised user amenity are typically assumed to be significant only
where overall traffic flow or HGV traffic flow doubles.  The only place where this is
predicted to occur would be the 800% increase in HGV movements at the southern end
of Woodhall Mill Road as discussed at point (ii) above, however the absence of any
sensitive receptors on this section of road, limited footfall, and the adequacy of existing
and proposed footpath widths mean that the impact on non-motorised user amenity is
assessed as negligible.
• Fear and intimidation experienced by road users as a result of traffic volume, speed and
heavy vehicles using the scoring system employed by the ES does not alter to any
significant extent at any existing location.  The only location where there is a change in
the scoring is the southern end of Woodhall Mill Road (as discussed above), where the
increased overall traffic level results in a slightly higher score but one which is still
categorised as “moderate”.  The 800% increase in heavy vehicles at this location does
not alter the score because the daily number of such movements (960) is still judged to
be “small” because it is below the “medium” threshold of 1,000 HGV movements.  (Whilst
there are no commonly agreed thresholds for scoring, the ES uses thresholds that are
Page 76 of 90

Page 77

suggested in relevant guidance).  As a result the effect on road users’ fear and
intimidation is assessed as negligible.
• The existing pattern of road accidents in the vicinity of the site is typical for the types of
road concerned and does not suggest any underlying problems.  The ES therefore
concludes that whilst adding additional traffic to the network is likely to result in a
proportional increase in the number of accidents, the absolute number of accidents would
be small.  Across most of the local road network the proportionate increase in traffic is
relatively small, and those streets / junctions where traffic would increase more
significantly the proposal would include mitigation where necessary.  The design of new
road infrastructure will meet current standards which include embedded road safety
mitigation.  The overall effect on road safety is therefore assessed as negligible.
• Driver delay is only likely to be significant in situations where a development will
overwhelm the capacity of the local road network, which is not the case here.  The
submitted Transport Assessment demonstrates that subject to some mitigation work the
local road network is capable of accommodating the traffic from the new development,
albeit that the full impacts of the proposed new spine road and of any major trip-
generating uses within the new development would require further information at the
appropriate future stages.  The proposed off-site mitigation is primarily intended to
improve road capacity so as to limit the need for additional queuing during peak periods. 
Subject to this, whilst limited residual impacts in driver delay may occur during peak
periods, the overall magnitude of these is assessed as negligible.
• Pedestrian delay is related to severance as discussed above.  As the ES has concluded
that the proposal would have a negligible impact on  severance of existing communities,
and the proposal itself would be designed to incorporate suitable pedestrian
infrastructure including suitably sited and designed crossing facilities, the ES concludes
that impacts on pedestrian delay would also be negligible. 
11.21 The conclusions of the ES in respect of traffic and transportation impacts are accepted by
the Planning Service.  By creating what amounts to a bypass for Calderbank there would be
some benefit to that village in terms of reduced through traffic, though this would be offset by
additional traffic from the new development.  The proposed industrial and storage /
distribution uses have potential to create significant amounts of heavy goods vehicle
movements but the routing of these would be overwhelmingly towards the M8 / A8 with
limited impact on local roads.  Traffic volumes are already relatively high on the main routes
surrounding the site, and subject to the proposal not giving rise to undue congestion
(covered elsewhere) the additional traffic from the site is not anticipated to result in
significant environmental effects.  (This assessment relates only to the impacts of the
predicted traffic on the surrounding environment and does not relate to the wider sustainable
travel issues which are discussed elsewhere in this report). 
11.22 In terms of Noise and Vibration Impacts, the existing noise survey has established baseline
noise levels on the site, and this shows that the site does not currently have any major noise
sources but it is affected by traffic noise at its edges, in particular in the southern part of the
site where background noise from the M8/A8 corridor is constant throughout the day and
night. The application seeks industrial and storage distribution development in that part of the
site, whereas the new housing and other more noise-sensitive uses would be in the northern
part of the site where existing noise levels are much lower.  The ES noise chapter does not
consider the impact of additional noise from the development affecting the peacefulness of
existing countryside areas, as that is a matter concerning the value of the countryside rather
than a noise issue per se.  The potential noise and vibration impacts are assessed by the ES
as follows: 
• The construction phase of development will involve various noisy activities and due to the
size of the development the construction period will be of extended duration, although
Page 77 of 90

Page 78

much of the site is not particularly close to noise-sensitive premises.  If no construction
noise mitigation measures were implemented there would be a major adverse impact on
many of the homes within and around the site.  However, it is intended to implement
measures to control construction noise and vibration through a construction environment
management plan (CEMP).  Subject to mitigation, the noise impacts are assessed as
moderate adverse at most of the surrounding homes (at Calderbank, Woodhall Mill Road,
Carnbroe, Low Palacecraig and Faskine Farm).  Impact on housing on the southern edge
of Airdrie is assessed as negligible;
• Some vibration-intensive work would be required and if these were to take place within
15m of sensitive receptors then this could result in moderate adverse effect.  However
almost all such activity will be at a greater distance away from sensitive receptors so the
impact would be negligible.
• Noise from construction traffic on existing receptors is assessed as negligible, based on
estimated traffic flows and routings compared to existing traffic volumes and composition
on the affected roads;
• The new housing and other noise sensitive premises would be built in parts of the site
where existing motorway traffic noise is lower and it is anticipated that suitable internal
noise levels will be achievable with an ‘open windows’ noise mitigation scheme.  The
impact of existing traffic noise on the new development is therefore assessed as
negligible;
• The precise use of the non-residential parts of the development are not currently known,
so future detailed applications may require detailed noise impact assessments and
specific mitigation.  However, the large industrial and storage/distribution units would be
at a distance from housing, and subject to suitable noise control measures the effect
fixed plant and non-residential activities is likely to be negligible.
• Once operational the development will give rise to increased traffic on the local road
network, but the precise amount and nature of this will depend upon what uses might
emerge for the commercial plots.  The ES considered two scenarios – one with the
distribution traffic split 85%/15% between the strategic and local road network, and the
second with a 60%/40% split.  For both scenarios the only roads where increased traffic
noise is assessed as being above negligible are Woodhall Mill Road (B802) between
B799 Chapelhall roundabout and the proposed new spine road junction, and the
eastbound A8 approaching M8 Junction 6A (Chapelhall) north roundabout.  All such
effects are assessed as minor adverse other than the impact on Woodhall Mill Road in
the 85%/15% scenario which is assessed as moderate adverse.  There are no noise
sensitive premises fronting or directly adjoining these sections of road, and this area is
already affected by noise from the motorway corridor;
• The new link road through the site will give rise to traffic noise within the site and new
houses, etc., may require noise mitigation to address this, however no existing noise-
sensitive premises are likely to be affected so the effect is considered to be negligible;
• The proposed non-residential uses, including the local centre, general industrial units and
storage / distribution units, may give rise to operational noise, but assessment of these
would require details of the future occupants and could be addressed by noise impact
assessments as part of future detailed applications.  The ‘worst case’ scenarios are
considered to be if a particularly noisy storage / distribution use were proposed for the
large unit in the south-eastern corner of the site, close to the small group of houses at
Woodhall, or a noisy commercial use was proposed for the local centre.  In either case it
would be up to the proposed developer to demonstrate satisfactory mitigation as part of a
detailed application.  The occupational noise from these uses is therefore assessed as
negligible;
• The only appreciable cumulative noise or vibration effect that has been identified would
be if the proposed development was being implemented concurrently with the two
previously approved developments at Eurocentral, in which case the combined
construction traffic would give rise to a temporary minor adverse effect.
Page 78 of 90

Page 79

11.23 The above conclusions of the ES in respect of noise and vibration are considered to be
reasonable.  The main unknown is the nature of the occupants of the large storage /
distribution units and the nature of their operational noise and traffic, but these are matters
which would be considered further at a detailed application stage, and it is not considered
that noise or vibration impacts from the development as a whole are likely to be significant.   
11.24 In terms of Air Quality Impacts, the site is not within or close to any existing air quality
management area (AQMA).  However, the site is surrounded by busy roads where exhaust
emissions will be high, and the former Chapelhall AQMA was around 1km east of the site
(the AQMA was revoked during 2024 though it continues to be monitored).  The ES
concludes that subject to the implementation of suitable mitigation measures the effects of
the development on air quality would be as follows: 
• During construction the main air quality effect would be the potential for dust and exhaust
emissions from vehicles and plant.  These would be of a temporary nature.  Normal good
practice methods for control of construction dust would mean that the effects of dust
would be negligible. Emissions from construction vehicles and plant would also be
temporary and dispersed over a large site and road network, while mitigation measures
(such as routing strategy and minimising of HGV movements during peak times) are
proposed.  Therefore, even a worst-case assessment based on the peak construction
period results in the effects being classified as negligible;
• Upon completion of the development, the main air quality effects are likely to arise from
traffic emissions.  As there is some uncertainty about how the construction of the link
road would affect existing traffic patterns, this uncertainty also applied to traffic
emissions.  However, it is possible that at some locations traffic may reduce as a result of
trips being diverted onto the new link road instead.  Modelling of the year 2045 suggests
that nitrogen dioxide (NO2) levels at sensitive receptors (basically housing and other
populated places) would be virtually identical whether the development takes place or
not, while particulate matter would vary slightly both up and down.  However, other than
within the site itself, both NO2 and particular levels would in all cases be lower than the
2018 baseline level (largely due to reduced emissions from more modern vehicles).
Within the site, levels would be higher than they are presently, but in line with levels in
the surrounding area.  The ES therefore assesses the effect of both categories of vehicle
exhaust emissions on local air quality as negligible.
• Cumulative impacts with consented developments are assessed as negligible in respect
of dust and plant emissions.  A worst-case scenario where peak construction traffic from
all of the developments coincide at the same time and place would result in a temporary
minor adverse impact.  The cumulative impact of emissions from operational phase traffic
is also assessed as negligible. 
11.25 The conclusions of the ES in respect of air quality are accepted.  It should be noted however
that the ES does not assess emissions from the new buildings within the site (e.g. the new
industrial units and district heating system).  These are matters which would require more
information and therefore would need to be assessed as part of future detailed applications. 
In respect of transport emissions the ES concludes that the impacts on air quality the local
area would be negligible based on predicted traffic levels, but that is not a commentary on
the overall sustainability of the site in terms of carbon emissions from transport, which has
been discussed earlier in this report (para 10.40 et seq). 
11.26 In terms of Water Resources and Flood Risk Impacts, existing receptors include the North
Calder Water, various smaller watercourses, the Monkland Canal, several ponds within the
site, existing Scottish Water drainage infrastructure and private water supplies, and
Page 79 of 90

Page 80

groundwater.  Parts of the site are at risk of flooding (mainly low-lying ground alongside the
North Calder Water).  The ES assesses the effects of the development on these as follows: 
• There is potential for impacts on the receptors arising from construction phase activities
(e.g. vegetation clearance, earthworks, soil erosion, spillages and new bridge
construction resulting in pollution of water resources), but subject to the proposed
mitigation measures to prevent such occurrences, the ES assesses the construction
phase as having negligible effects on these receptors;
• The operational phase (completed development) would also involve potential for
contamination of surface water (e.g. by spilled vehicle oils/fuels, domestic chemicals,
road salt etc.).  This would be managed through the SUDS infrastructure to prevent
pollution of water bodies.  Any specific risks from the new industrial uses would require to
be considered as part of a detailed application.  Subject to mitigation the effects of the
construction phase are therefore assessed as negligible;
• The construction of large areas of new hardstanding would result in increased surface
water runoff which could increase flood risk, however this would be managed using
SUDS as is standard for all new developments.  New bridges would also require to be
designed to ensure that they did not cause changes to flood risk.  The proposed
masterplan avoids siting incompatible forms of development within the flood plain. 
Therefore, subject to suitable design and mitigation measures, the impact on flood risk is
assessed as negligible; 
• No cumulative risks have been identified in respect of water resources or flood risk. 
11.27 The conclusions of the ES in respect of water resources and flood risk are accepted. 
Additional detail including more detailed surveys and remediation proposals would be
needed as part of any future detailed applications, however it is considered that the
development would not give rise to significant environmental impacts in these respects. 
11.28 In terms of Ground Conditions Impacts, the site is very large and invasive site investigations
have not yet been carried out, however a ‘Stage 1’ desk study has been carried out to
identify known risks, and more detailed ‘Stage 2’ site investigations would be carried out prior
to development taking place.  The site has a history of mining and other industrial activities,
some of them very old and poorly documented, so there is a high likelihood of adverse
ground conditions such as contaminated or made ground, shallow mineworkings and
mineshafts being encountered within the site.  The ES identifies and assesses the potential
impacts relating to the ground conditions as follows: 
• Construction phase risks to site workers or users of previously completed phases from
exposure to historic contaminants, ground instability from old mineworkings, ground gas
accumulation in excavations, mishandling or leakage of materials used in
decontamination work, etc., arising from construction activity  These risks would be
mitigated by detailed site investigations prior to commencement of development and by
appropriate mitigation including site health and safety measures, and therefore the
residual effects are all assessed as negligible;
• Construction and operational phase risks of environmental pollution from contaminant
migration (e.g. existing contaminants in the ground spreading or getting into
watercourses).  Again, such risks would be managed by appropriate site management
practices so the residual effect is assessed as negligible;
• The risk of site users being exposed to historic contaminants on the site following
completion of development would be addressed by the detailed site investigations and
remediation which would be carried out prior to development.  Whilst more people would
be using the site, the contaminated ground would be either treated, removed or capped
so the risks of persons being exposed contamination hazards should be reduced overall. 
The effect is therefore assessed as negligible/minor beneficial.
Page 80 of 90

Page 81

• Similarly, the risks to site users and property from ground instability due to old
mineworkings would be addressed by identifying and remediating areas of concern, so
that although use would increase the risks would be removed.  This is assessed as
moderate/minor beneficial in undeveloped parts of the site and as major beneficial in
development areas;
• Risks of ground gas accumulating in buildings would also be addressed through detailed 
remediation proposals so residual effects are assessed as negligible;
• The only potential cumulative impact relating to ground conditions would be if
construction traffic associated with ground remediation peaked at the same time as
construction traffic from other sites, however this could be addressed by construction
traffic management measures and the effect is assessed as negligible. 
11.29 The conclusions of the ES in respect of ground conditions are accepted.  Additional detail
including more detailed surveys and remediation proposals would be needed as part of any
future detailed applications, however it is considered that the development would not give
rise to significant environmental impacts in these respects. 
11.30 In Summary of the Environmental Statement, the ES concludes that the environmentally
significant adverse impacts of the development would be: 
• Major adverse effect on the landscape during construction due to loss of agricultural
fields;
• Moderate adverse effect on landscape and visual amenity due to construction activity;
• Potential for cumulative adverse effects on landscape during construction if other nearby
developments take place concurrently;
• Moderate adverse noise effects during construction; and
• Moderate/minor adverse noise effects at Woodhall Mill Road due to increased traffic. 
Other than the last point, these would all be temporary effects which would either be reduced
or would cease once development was complete.  The ES also concludes that the proposal
would have the following significant beneficial impacts: 
• Moderate/minor beneficial landscape effect due to new woodland and other landscape
planting and ongoing management and maintenance of the landscape;
• Moderate beneficial effect during construction due to repairing and retaining the existing
canal bridges;
• Major/moderate socio-economic effect due to reduction in unemployment, in cumulation
with other local developments; and
• Minor beneficial effect due to stabilising of old mineworkings. 
11.31 The Planning Service concurs with the majority of the ES but disagrees with certain of these
conclusions.  Specifically, it is considered that: 
• The adverse effects on the landscape would be major and permanent due to the
urbanisation of the site and the irreversible loss of the open field system and of the
remaining designed-landscape character of the Woodhall House estate, which are
important and attractive features of the local landscape;
• There would be locally significant adverse permanent effects upon cultural heritage due
to the impact on the setting of the Monkland Canal, Woodhall House estate, and High
Palacecraig;
• The estimated socio-economic benefits of the proposal are considered to be based on
unduly optimistic assumptions and to be overestimated.  Based on the available
information, the beneficial effects on employment and the local economy are not
considered likely to be significant.
Page 81 of 90

Page 82

12. Other Material Considerations 
12.1 The majority of material considerations have already been covered in the discussion above,
but there are a few matters which have not yet been addressed, including: 
• Applicant’s views on the site’s Green Belt designation
• Planning history of the site
• Country park and community ownership proposals
• Football academy
• East Airdrie Link Road
• Matters raised in representations 
12.2 The applicant has suggested in their planning statement that the application site ought not to
have been included in the Green Belt, on the basis that NPF4 states that Green Belt may be
zoned “around” settlements whereas the application site is “almost in the middle of a
settlement”.  Whilst acknowledging that the site has value as greenspace, the applicant
considers that the site “is not a countryside site” and “it is in an urban location and therefore
should not be considered to meet the objectives of the green belt”.  It is suggested that had
the Council held off adopting the LDP until after NPF4 was adopted the site might have been
removed from the Green Belt, and that the current application is an “opportunity for the
Council to change the status of the land”.  These arguments are not accepted.  This section
of Green Belt is serving a clear purpose in facilitating compact urban growth, and in
preventing further urban sprawl.  Whilst the section of the Green Belt along the M8 corridor
has been under significant development pressure and has shrunk as a result of previous
planning decisions, the application site covers a large and relatively unspoilt area of
countryside which is important to the landscape setting and identity of the adjacent
settlements.  The suggestion that the LDP should have been delayed to await NPF4 is not
realistic, and if the applicant disagreed with the site’s inclusion in the Green Belt then that
should have been raised at the appropriate stage in the LDP process.  The suggestion that
the current application provides an opportunity to change the status of the land amounts to
an invitation to the Council to disregard the policies of the statutory development plan, but
that would not be an appropriate way to address the matter.  Such a major proposed change
to the Green Belt boundary should properly be considered as part of the formal Green Belt
review process, and if the applicant considers that parts of the site should instead be
allocated for major housing and/or industrial development in the emerging local development
plan then they should put the site forward through the Call For Ideas process for the
proposed plan.  That would allow the full consideration of the appropriateness of the Green
Belt boundary and of the sustainability of the site relative to alternative locations, which this
planning application process cannot replicate.  Unless that takes place the site will remain in
the Green Belt, of which it is considered to be an important and integral part. 
12.3 As noted above (para. 6.2), part of the application site was once designated as a “nationally
safeguarded inward investment area”, and it has been suggested by the applicant that this fact
counts in favour of the proposal, as the proposed industrial units (and in particular the large
storage and distribution plots) would support inward investment in the strategically important
M8 corridor, and because the previous designation implied an acceptance of development
within the Woodhall House estate.  However, the fact that for a limited period some years ago
the site had a dual Green Belt / strategic investment designation is no longer relevant when
set against the fact that the investment designation was explicitly removed from the site in later
plans, and the fact that the current statutory development plan designates the site solely as
Green Belt.  The designation was removed because the council identified more suitable and
less environmentally valuable sites to be safeguarded for such uses, though typically these
have not been taken up because of limited demand for the type of development they covered. 
Notably, part of the Green Belt south of Lancaster Avenue in Chapelhall effectively replaced
Page 82 of 90

Page 83

the Woodhall / Faskine site as it was given a dual Green Belt / Specialised Limited Use and
dual Green Belt / High Amenity Location designations in the 2012 local plan and the 2022 LDP
respectively, however it has not been developed for any such purpose and this lack of
developer interest was a factor in the council deciding to approve non-conforming development
on parts of that site.  In any event, the historic investment designation at Woodhall / Faskine
was extremely limited in its scope, as it was intended to ensure the availability of land for very
large inward-investment proposals (e.g. multinational firms requiring a large factory which
would provide a large number of genuinely new jobs) for which no more suitable site could be
found.  In the absence of such a proposal the land was intended to remain as Green Belt. 
Even if the historic designation were still in effect it would not have supported the types of
industrial development which this application proposes, and still less would it have supported
the development of 980 houses on a different part of the application site. It is therefore
considered that the previous designation of the site does not carry any significant weight and
does not establish the suitability of the site for any kind of development other than that which
would be compatible with its Green Belt status. 
12.4 The application includes proposals for a country park, and the applicant proposes to pass
ownership of the woodland along with other open space including the allotments and
community gardens to a community-owned trust.  The applicant invited local community
groups to take part in a steering group which they have set up, although thus far only a few
community groups who support the application have participated in this.  Understandably the
community groups which oppose the development have to date not wished to take part in the
steering group, though if permission were to be granted the applicant hopes that a wider range
of groups may take part.   The applicant proposes to set up the trust and to provide five years
of funding, with long term funding coming from a share of the factoring charges from the
development.  However, whilst it is normal for modern private housing developments to be
subject to factoring fees covering the maintenance of landscaped areas and for social housing
landlords to undertake such maintenance within their own developments, the upkeep of a
substantial area of woodland including a country park open to the entire community would go
beyond what is usual and has potential to be quite onerous.  If the proposed business uses
are also intended to contribute to the upkeep of the country park then this again would be an
abnormal expense which may reduce the attractiveness of the proposed units, while problems
might arise if a high proportion of the funding was sourced from a few large units and these
fell vacant.  Therefore, although the principle of a community-owned country park is of course
to be supported and there is no objection in principle to the funding method suggested, more
detail would be needed in order to demonstrate that this will be viable in the long term and will
not result in the trust having insufficient resources to maintain the country park properly, or an
expectation that the council assume responsibility for it. 
12.5 The proposal includes a football facility for the benefit of Gartcairn Football Academy, a youth
/ junior football club which is a registered charity and which currently rents its home ground in
Rawyards Park adjacent to Airdrie Leisure Centre.  The proposal would provide the club with
a significantly enhanced facility, which would benefit the young people who take part in the
club’s sporting activities.  This is in principle to be welcomed, and conceivably a sporting use
might in itself be compatible with Green Belt policies depending on the details of the facility
proposed (in respect of which little information has been provided).  However, the facility would
be a very small part of the development and it is not considered that its inclusion in the
application would serve to justify the remainder of a much larger proposal which is significantly
contrary to multiple development plan policies as set out above. 
12.6 The East Airdrie Link Road is a planned new road between Newhouse and Stand / Riggend,
which would allow the A73 to bypass Chapelhall and Airdrie and would form part of the
intended Pan-Lanarkshire orbital transport corridor.  It is intended to improve journey times
and reliability, improve connectivity between towns, businesses and facilities, and improve
local air quality by reducing traffic congestion through towns. The project is to be partially
Page 83 of 90

Page 84

funded through City Deal, and an application for planning permission for the new road is
expected to be submitted shortly.  This planned road should further improve the (already very
good) road connections which make the M8 corridor attractive for business development but
which also encourage private car use.  The EALR is likely to result in changes to traffic levels
which the transportation assessment for this application has not been able to take account of,
but these changes may be expected to mitigate against some of the impacts of the
development (for example by relieving traffic congestion in Chapelhall).  No significant conflicts
between the EALR and the application proposal are anticipated.  Overall, it is not considered
that the EALR project has any significant bearing on the application proposal, either for or
against. 
12.7 There has been some antagonism between those supporting and objecting to the application
over the quantity and veracity of representations submitted to the council.  The application was
subject to three rounds of public consultation over six years, with many people making several
representations and it is therefore impossible to state a precise number of individuals who
have objected.  However, the council’s protocols specify that multiple representations from the
same address are to be counted as a single representation and that all representations must
include a full name and postal address, and by this measure the number of valid
representations is as stated in para 9.1 above.  All of the matters raised which were material
planning considerations have been included in this report.  Most of the issues contained in
representations have been discussed above, but the following is a summarised response to
the points raised: 
12.8 Countryside and Landscape Objections:  If the principle of development been acceptable then
it is not considered that “big box” style industrial and warehouse buildings would have been
inappropriate given the existence of similar-sized buildings in the local landscape at
Eurocentral and elsewhere.  The loss of any agricultural land reduces food security but the
impact of this proposal would be small and the land concerned is not designated as prime
agricultural land. However, the wider concerns raised by objectors in respect of the adverse
impact on the appearance of this area of attractive countryside and on the setting of Airdrie
and Calderbank, the loss of the designed landscape, the risk of urban sprawl and the impact
on the integrity of the Green Belt are all acknowledged and are reflected in the
recommendation of refusal 
12.9 Open Space Objections: It is acknowledged that the site is well used and valued by local
people for countryside walks and other recreational and healthy living pursuits, and the site
currently has a peaceful and attractive rural environment which is readily accessible to people
of all ages and means.  The development of large parts of the surrounding land would make
the area less attractive to some users, and there are few other areas of equivalent size or
quality nearby, so public access to the countryside would be reduced. This would be balanced
by the proposed improvements to the path network and the proposed formalisation of public
access through the creation of a country park on parts of the site.  The principle of a country
park is to be welcomed although as explained above its funding and management
arrangements would need to be agreed.  The proposed football facility has been discussed
above and whilst it is potentially an appropriate use for a Green Belt site and would improve 
local sports facilities, it is a very small part of the proposal which consequently carries limited
weight as a material consideration.  Overall, many of the open space / countryside access
issues are addressed in Green Belt policies, and are therefore reflected in the recommended
reasons for refusal. 
12.10 Ecology and Natural Environment Objections: The impact on ancient woodland, other habitats
and wildlife are discussed above, and broadly it is concluded that while there would be some
adverse impacts these would be relatively minor and capable of being addressed by mitigation,
notably the proposed additional woodland planting.  This reflects the survey findings which
found that few parts of the site are in themselves of elevated environmental value, and the fact
Page 84 of 90

Page 85

that the proposal would largely avoid woodland areas and confine development to farmland of
lower ecological value.  Even so, there would inevitably be disturbance to wildlife and changes
to many parts of the site which would impact upon some (generally non-protected) species
and habitats, and the development of large parts of the site would be detrimental to the
Glasgow and Clyde Valley Green Network.  Such impacts could be justified if there was a clear
need for the development or if the benefits of the development would give rise to significant
and clearly defined benefits, but that is not considered to be the case.  The impact on the green
network is therefore reflected in the recommended reasons for refusal. 
12.11 Historic Environment Objections: The impact on the Monkland Canal, the Woodhall House
estate and High Palacecraig are discussed above and it is considered that the proposal would
detract from the setting of these assets, which is reflected in the recommended reasons for
refusal.  Archaeological interests would be capable of being addressed by conditions, and the
social history of the site is not considered to be an overriding issue in this case. 
12.12 Housing and Industrial Development Objections:  As discussed above it is considered that
there is already an ample supply of housing land across North Lanarkshire and no requirement
to release additional Green Belt land for a further 980 houses. The council is not able to dictate
the size or price of new open market houses as this would be for the market to determine,
however the proposal includes a significant number of affordable homes and it would be
possible to secure their delivery by way of a condition or legal agreement. The height and
design of any housing would be a matter for subsequent detailed applications.  Industrial land
supply issues are more complex, however it is not considered that the application proposal
represents a necessary or satisfactory solution to the limited availability of very large single-
user sites, and allowing its development would make the development of preferable and more
sustainable sites less likely.  Doubts about the predicted employment benefits are
acknowledged and shared.  These matters are reflected in the recommended reasons for
refusal. 
12.13 Town Centres, Services and Utilities Objections: Some of the objections in respect of town
centres and retailing related to the original 2018 proposal and are less relevant to the current
amended proposal. It is acknowledged that there is little detail about what the proposed local
centre might contain, and that it would not be appropriate for it to contain uses that would
detract from existing centres or for which sequentially preferable sites might be available, but
as discussed above it is considered that this would be capable of being controlled by conditions
in the event of the council being minded to approve the development.  School capacity
constraints have also been discussed above and details of the developer contribution towards
addressing this would need to be agreed and controlled by a planning obligation in the event
of approval.  Drainage impact is considered to be acceptable, but detailed designs would be
needed as part of any AMSC applications. 
12.14 Amenity and Pollution Objections:  Noise and air pollution matters have been discussed above
and it is considered that there should be no material increase in air pollution or noise, except
for construction noise which should be mitigated against by suitable working methods and
additional traffic noise on a section of Woodhall Mill Road where there are no houses.  If any
of the industrial units was to be used for a purpose generating abnormal noise or emissions
then that would be considered as part of a future detailed application.  Construction activities
would require to be carried out in accordance with appropriate site management practices to
minimise risks of pollution and disturbance, which could be controlled by conditions.  Any
development of this scale would involve some disruption and disturbance during the
construction period but subject to the aforementioned controls it is not considered that this
would be excessive.  It is not considered that the development would give rise to a significant
amount of light pollution as it lies adjacent to an extensive existing urban area, and any external
lighting with potential to affect either residents or road users would also be controllable by
conditions.  
Page 85 of 90

Page 86

12.15 The residents of those houses which are surrounded by or directly adjacent to the application
site would inevitably be at greatest risk of disturbance during construction so the site
management arrangements would need to include specific mitigation to minimise this. Issues
relating to the access and ownership rights and the applicant’s consultations with those
householders are private legal matters, but the developers would obviously need to ensure
that access and services to third party landowners was maintained throughout the construction
period.  The residents in these properties currently live in or adjacent to the countryside and
would therefore experience a major change to their surroundings if the fields onto which their
properties face were to be developed, which is something to which they might understandably
be strongly opposed, however future detailed applications would be expected to maintain an
appropriate level of residential amenity for those residents so this would not be sufficient as a
reason for refusal. 
12.16 Traffic and Sustainable Travel Objections: Traffic impacts have been discussed above, and it
is not considered that the development would exacerbate existing peak hour congestion in
Calderbank or Chapelhall.  The construction of the new spine road bypassing Calderbank
would be likely to provide some relief for Calderbank, and traffic to/from the north via the A73
might be expected to use Brownsburn Road rather than Chapelhall.  By the time the
development was complete it would be hoped that congestion in Chapelhall would have been
addressed by the planned East Airdrie Link Road.  Other roads would experience additional
traffic, but this has been the subject of extensive discussions with the local and national roads
authorities and with the proposed mitigation work and further surveys once the spine road is
complete, the traffic impacts (including construction traffic) are considered to be acceptable. 
It is not considered that there would be an adverse impact on road safety. 
12.17 Opinions differed amongst respondents about the previously proposed connection to the M8 /
A8 at Eurocentral (Junction 7).  Some respondents felt that this would create a ‘rat run’ through
existing residential areas and encourage unsustainable long-distance commuting, whereas
others felt that it would relieve congestion elsewhere and improve access to jobs at Eurocentral
so should be reinstated into the proposal.  The connection to Junction 7 is no longer part of
the application because traffic modelling indicates that it is not required to accommodate traffic
from the current proposal, as has been confirmed by the local and national roads authorities. 
There would also have been significant engineering challenges to its construction due to
ground levels in this part of the site.  A pedestrian / cycle connection would however be
provided which would improve active travel access to Eurocentral. 
12.18 Concerns about the site having poor public transport, being over-reliant on car use and not
meeting 20 Minute Neighbourhood expectations have been discussed above and are reflected
in the proposed reasons for refusal. 
12.19 Other Objections: Flood risk and ground conditions have been adequately addressed for a
permission in principle application.  The updated Environmental Statement and other
supporting documents are considered to comply with legal requirements and to be sufficient
to allow a proper consideration of the application.  The applicant’s documents inevitably
present the proposal in a positive light with which objectors may disagree, but the application
has been assessed on its merits and where the Planning Service does not agree with the
applicant’s conclusions the reasons for this have been explained above. 
12.20 Representations of Support: The economic impacts of the proposal including employment
likely to be generated have been discussed above, and whilst there would be some benefit it
is considered that this is not likely to be nearly as much as the applicant suggests.  The
provision of new housing in the Green Belt would require a strong justification, but in this case
there is considered to be a sufficient supply of housing land without the need to release
greenfield sites.  Provision of new schools is in principle welcome, but the developer would
Page 86 of 90

Page 87

only be required to fund that proportion of the cost which directly relates to their own
development, so allowing a development which necessitates unplanned expansion of the
schools estate has significant implications for the Education Service. The inclusion of low-
carbon design features in new housing would be welcome but this is increasingly required of
all new housing and does not overcome other concerns about the sustainability of the proposal. 
The proposed woodland planting, plans for community ownership of greenspace and provision
of sports facilities are also welcome, but these things are proposed as mitigation for the loss
of a large area of countryside.  Comments about the site being in poor condition and subject
to anti-social behaviour are noted although these are disputed by others, and ultimately they
would not provide a justification for development of the Green Belt.  Overall, whilst the various
benefits of the proposal are noted, it is not considered that they are sufficient to overcome its
many disadvantages. 
13. Conclusions 
13.1 The application seeks planning permission in principle for up to 980 houses and
112,410sq/m of storage, distribution and industrial floorspace along with various ancillary
uses including a new local centre and primary school campus and infrastructure including a
new spine road, on land within the Green Belt.  The applicant considers that the housing is
justified because there was a shortfall of housing within the former Airdrie and Coatbridge
Housing Sub-Market Area at the time of the local development plan enquiry, and that the
application site is a suitable and sustainable site on which to address that shortfall.  The
applicant also considers that there is a need for additional employment land within North
Lanarkshire, in particular along the M8 corridor and for sites which are large enough to
accommodate very large storage and distribution facilities, and it is similarly argued that the
site would meet this requirement.  Additionally, the applicant considers that the application
site ought not to have been included in the Green Belt, and that the need for the
development justifies the development of this land.  The applicant has also indicated a range
of community benefits which they believe would arise from the development, including a
substantial number of new jobs, other economic benefits, the provision of new road and
community infrastructure, new woodland planting and environmental improvements, the
creation of a new country park and provision of a youth football facility.  In respect of the
various historic and natural environment assets within the site, the local landscape, the
Monkland Canal and other protected sites, the applicant considers that the impacts of the
proposal would be acceptable and in some respects beneficial. 
13.2 The application has been carefully considered against the development plan, taking into
account the environmental impact assessment, the applicant’s supporting documents,
representations received and all other material considerations.  It is concluded that the
application is contrary to multiple policies of the development plan, and in particular the
proposal would represent a significant departure from Green Belt policies and from the
Council’s spatial strategy, meaning that development would likely occur on the application
site at the expense of alternative, more sustainable and socially beneficial, locations.  The
proposal is also considered to be unacceptable due to having a significant adverse impact on
the landscape and built heritage at this location, and to be unsatisfactory in terms of the
site’s limited sustainable travel opportunities.  It is acknowledged that the proposal has some
benefits, but the need for additional housing land and the justification provided for the
employment land are not accepted, and it is considered that the employment and economic
benefits are likely to be substantially less than the applicant estimates.  The benefits of the
proposal are therefore not considered to be sufficient to justify such a significant departure
from the development plan, and for this reason it is recommended that planning permission
in principle should be refused. 
Page 87 of 90

Page 88

13.3 Should the Council be minded to approve planning permission in principle, then the
permission should not be released until such time as a legal agreement had been concluded
to secure developer contributions and to specify the developer’s responsibilities in respect of
increasing education capacity, road network improvements, sustainable transport
infrastructure, public transport support, and the management of open space, all of which
would be necessary to mitigate the impacts of the development.
Page 88 of 90

Page 89

The scaling of this drawing cannot be assured
Revision Date Drn Ckd
ScaleDate
RevisionProject No Drawing No
Drawing Title
Project
Stantec UK Limited
Check byDrawn by
stantec.com\ukCertificate FS 29637U:\333100588\A4 - Drawings & Registers\Masterplanning\Adobe files\333100588-EH-M-Ind02,3-A-Masterplan and Parameters-B (RL Changes).indd (1)
N
The Blade
Abbey Square
Reading
RG1 3BE
T: 0118 9430 000
EuroPark
Indicative Masterplan
26-02-24 1:5000@A1 HJ MW
333100588 Ind02 B
- - --
Legend
Primary Street
Secondary Street
Residential Urban Block
Water Body
SuDS
Art Trail
School
Local Centre
Industry
Open Space
Existing Woodland
Proposed Woodland
Paths
Allotments
Orchards
Sports Pitches
Community Sports Facility
Site Boundary (c.243.9ha)
EUROCENTRAL
CALDERBANK
CALDERBANK ROAD
CARNBROE
M8
B802
SYKESIDE ROAD
ScaleDate
RevisionProject No Drawing No
Drawing Title
Project
Drawing1.dwg - A1
Check byDrawn by
bartonwillmore.co.uk
Certificate FS 29637
DRAFT
0 10 20
5 15 25m
Development Site Under
Construction
New Educational Campus
Now In Place
Page 89 of 90

Page 90

Page 90 of 90