Agenda Document Pack - Communities Committee - 30/10/2023

North Lanarkshire Council · 30 October 2023
Back to Communities Committee — 30 October 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

19 October 2023
Members of the
Communities Committee
Chief Executive’s Office
Archie Aitken
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk
Notice is given that a Meeting of the Communities Committee is to be held in the Council Chamber, Civic Centre,
Windmillhill Street, Motherwell, ML1 1AB on Monday, 30 October 2023 at 10:00 AM which you are requested to attend.
The agenda of business is attached.
Archie Aitken
Chief Officer (Legal & Democratic)
Members :
Clerk Name: Andrew Rose
Clerk Telephone: 07951 409714
Clerk Email: rosean@northlan.gov.uk
K Stevenson, P Patton, D Ashraf, C Barclay, A Beveridge, B Burgess, A Campbell, D Crichton, F Fotheringham, M
Hughes, J Jones, A Khan, M McBride, B McCluskey, B McCulloch, J McLaren, F McNally, L Mitchell, L Nolan, D Robb, N
Shevlin, A Smith, J Toner, C Williams, G Woods.
Page 1 of 118

Page 2

Page 2 of 118

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical Standards In Public
Life Etc. (Scotland) Act 2000   
2 Community Council Quadrennial Elections 2023 - Outcome
Submit report by the Chief Officer (Legal and Democratic) (1) advising of the
outcome of the recent Quadrennial Elections for Community Councils in North
Lanarkshire following the close of the nomination process on Monday, 4
September 2023, and (2) seeking approval for the funding allocation for each
active Community Council for financial year 2023/24 and 2024/25 (copy herewith) 
5 - 10 
3 Community Boards and Partnership Communications Strategy
Submit report by the Chief Officer (Strategic Communication and Engagement)
providing an update on key progress linked to supporting the development of the
Community Boards model, including updates on the 12th cycle of Community
Boards meetings which took place throughout August and September 2023 (copy
herewith) 
11 - 20 
4 Community Board Local Development Programme
Submit report by the Chief Officer (Strategic Communication and Engagement)
providing an update on progress with the Community Board Local Development
Programme projects previously approved by committee and, seeking in principle
approval for new potential projects as proposed by local community groups (copy
herewith) 
21 - 50 
5 Community Safety Resilience Planning 2022/23
Submit report by the Chief Officer (Strategic Communication and Engagement)
advising of progress made on current community resilience planning and how it
contributes to the Community Safety across the nine Community Boards (copy
herewith) 
51 - 78 
6 Access to Free Period Products (Period Dignity Initiative) update
Submit report by the Chief Officer (Communication and Engagement) providing an
update on the activity relating to the delivery and further development of the
Access to Free Period Product / Period Dignity initiative (copy herewith) 
79 - 118 
Page 3 of 118

Page 4

Page 4 of 118

Page 5

North Lanarkshire Council
Report
Communities Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    CJ/AA Date 30/10/23 
Community Council Quadrennial Elections 2023 - Outcome 
From  Archie Aitken, Chief Officer (Legal and Democratic)  
E-mail johnstonec@northlan.gov.uk Telephone 01698 302058 
Executive Summary
This report advises of the outcome of the recent Quadrennial Elections for Community
Councils in North Lanarkshire following the close of the nomination process on 4
September 2023. 
In addition, the report seeks to approve the funding allocation for each active Community
Council for financial year 2023/24 and 2024/25. 
Recommendations
It is recommended that the Communities Committee:- 
(1) Acknowledge the current status of Community Councils in North Lanarkshire
following the Quadrennial Elections; 
(2) Approve the funding allocation, as set out within the report, for financial year
2023/24 and 2024/25.  
The Plan for North Lanarkshire
Priority  Enhance participation, capacity, and empowerment across our
communities
Ambition statement (19) Improve engagement with communities and develop their
capacity to help themselves
Programme of Work Statutory / corporate / service requirement
Item 2
Page 5 of 118

Page 6

1. Background 
1.1 At the meeting of this Committee on 24 April 2023, consideration was given to a report
seeking approval of the arrangements for Quadrennial Elections to establish
Community Councils in North Lanarkshire, in terms of the Scheme for Establishment
of Community Councils, on the basis that the current Community Council members
were required to stand down on 11 October 2023 at 11.59pm. 
1.2 The Local Government (Scotland) Act 1973 places a statutory duty on the Council to
establish and to provide financial and administrative support to Community Councils. 
2. Report 
2.1 Following an extensive public campaign, utilising the Council’s website and social
media pages, a video campaign featuring one of the active Community Councils and
its Members, alongside advertising in the local press, nominations were sought for
sufficient numbers of Community Councillors to establish and re-establish 80
Community Councils throughout the Council’s area. 
2.2 Where the requisite number of valid nomination forms in terms of the Scheme had been
received for a Community Council, that Community Council would continue to operate.   
Where the number of validly submitted nominations exceeds the number of vacancies
on a Community Council, it would be necessary to organise an election and polling, by
way of a secret ballot, which would take place locally. 
Where an insufficient number of nominations had been received, that Community
Council would cease to operate with effect from 11.59pm on 11 October 2023 and, to
re-establish that Community Council, it would be necessary that a petition be lodged in
terms of the Scheme for Community Councils. 
Re-Established Community Councils 
2.3  Nominations were received for membership following the nomination process and the
undernoted Community Council’s were re-established:- 
Banton & Kelvinhead, Bellshill, Cairnhill, Caldercruix, Carbrain & Hillcrest, Castlecary,
Central Wishaw, Chryston, Cleland, Coltness, Condorrat, Craigmarloch, Dullatur,
Glenmavis, Greengairs, Harthill & Eastfield, Kildrum, Kilsyth, Monkland Glen,
Newarthill, Newmains & District, North Calder, Overtown & Waterloo, Plains,
Salsburgh, Stepps & District, The Village, Thorniewood and Westerwood. 
2.4 There were 29 Community Councils re-established, on 12 October 2023, with their
inaugural meetings to take place within 42 days of establishment. 
Elections/Disbandment 
2.5 In Auchinloch Community Council the number of nominations for Community
Councillors exceeded the number of vacancies.  Accordingly, arrangements are being
undertaken to conduct an election on Thursday, 12 October 2023. 
2.6 Four Community Councils failed to attract sufficient nominations for Community
Councillors, which has resulted in their disbandment as undernoted:   
Kirkwood, Ladywell, Muirhouse & Flemington and Queenzieburn.
Page 6 of 118

Page 7

Funding for Financial Year 2023/24 and 2024/25 
2.7 As approved at a meeting of the former Finance and Resources Committee held on 12
March 2019, it was agreed that the sum of £350 per Community Council plus £9 per
100 of the electorate, rounded down to the nearest 100, provided annually as funding
to each of the operational Community Councils. 
2.8  Upon receipt and verification of each Community Council’s audited accounts by the
Chief Officer (Finance), and confirmation that the Community Council had submitted
the minutes of its meetings on a regular basis to the Council, the annual payment is
made. 
2.9 A figure has been set aside in the estimates for the financial year in the sum of £25,000
to accommodate this grant funding. 
3. Measures of success 
3.1 To successfully re-establish 30 Community Councils following the Quadrennial
Elections in terms of the North Lanarkshire Scheme for Community Councils and to
support and assist them by way of funding.   
4. Supporting documentation 
Not applicable. 
Archie Aitken
Chief Officer (Legal and Democratic) 
Page 7 of 118

Page 8

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Financial impact on the Quadrennial Election process and the funding to support
grant awards is at present contained within the current budget. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
To meet the statutory requirements of the Local Government (Scotland) Act 1973
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Page 8 of 118

Page 9

Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 9 of 118

Page 10

Page 10 of 118

Page 11

North Lanarkshire Council
Report
Communities Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    SP/MC Date 30/10/23 
Community Boards and Partnership Communications Strategy 
From  Stephen Penman, Chief Officer (Strategic Communication and Engagement)  
E-mail penmanste@northland.gov.uk 
costellom@northlan.gov.uk  Telephone 07725289559 
Executive Summary
This report provides an update on key progress linked to supporting the development of
the Community Boards model including updates on the 12th cycle of Community Boards
meetings which took place throughout August and September 2023. 
• progress with the delivery of the nine Local Outcome Improvement Plans (LOIPs)
and the implementation of an associated Monitoring and Management Framework
and Partnership delivery approach 
• Progress with the Community Board Development Programme 
• Work to commence development of a Partnership Communications Strategy 
As previously agreed by committee, reports on the work of the nine Community Boards are
provided to the committee relating to each committee cycle. Progress is also reported to
the North Lanarkshire Community Planning Partnership Strategic Leadership Board to
reflect the statutory nature of the Boards in Community Planning terms in providing local
governance for the Local Outcome Improvement Plans. This report covers cycle 12
Community Board meetings. 
The process and focus of reporting on the work of the Community Boards will continue to
be reviewed and elements included within the Local Outcome Improvement Plan
monitoring and management framework.
Recommendations
It is recommended that the Communities Committee: 
(1)  Recognises work to continue to develop and improve the integrated approach to
supporting the local Community Board model.  
The Plan for North Lanarkshire
Priority  Enhance participation, capacity, and empowerment across our
communities
Ambition statement (20) Improve the involvement of communities in the decisions,
and development of services and supports, that affect them
Programme of Work All Programmes of Work
Item 3
Page 11 of 118

Page 12

1. Background 
1.1 Community Matters - A Framework for Working with Communities set out the
Community Planning Partnership’s commitment to engaging with communities
underpinned by a set of principles and approaches designed to deliver on key priorities
associated with working with communities which included the creation of Community
Boards. The framework was approved by the Policy & Strategy Committee at its
meeting on 19 March 2020. 
1.2 The Community Boards are integral to supporting community participation and
providing a single coordinated approach to governance for local communities, reflecting
statutory and regulatory requirements. The Boards continue to develop in a manner
consistent with influencing and delivering the Plan for North Lanarkshire outcomes at
local level. This is being driven through the Local Outcome Improvement Plans (LOIPs)
for each of the nine areas, ensuring a partnership focus on supporting service design,
delivery and community action reflecting both the ambitions within The Plan for North
Lanarkshire and the priorities and circumstances of individual areas. The LOIPs are
published on the North Lanarkshire Council website and were circulated to all
Community Boards.   
1.3 The monitoring and management framework for the delivery of the LOIPs is in place
and operational along with supporting partnership delivery approach through the
establishment of Local Partnership Teams. This is being used to inform reporting to
Committee, the North Lanarkshire Partnership (NLP) Strategic Leadership Board and
individual Community Boards. 
1.4 The twelfth cycle of Board meetings has now taken place; an example of an agenda is
included in Appendix 1. 
Table 1 – Cycle 12 Community Board Meetings 
2. Report 
Community Boards – Cycle 12 
Representation at Community Board Meetings 
2.1 At the twelfth cycle of Community Board meetings, attendance reflected a good mix of
partners, elected members, community groups and local people at all Board
Area Meeting Date & Time Location
Shotts 22/08/2023 at 6.30pm Salsburgh Community Centre
Northern Corridor 23/08/2023 at 6.30pm Life Centre, Glenboig
Coatbridge 24/08/2023 at 6.30pm Riverbank School, Coatbridge
Cumbernauld 29/08/2023 at 6.30pm Abronhill Community Centre
Kilsyth & Villages 30/08/2023 at 6.30pm St Patricks Primary School, Kilsyth
Wishaw 31/08/2023 at 6.30pm Newmains and St Brigid’s
Community Hub
Airdrie 06/09/2023 at 6.30pm Cairnlea Parish Church 
Bellshill 07/09/2023 at 6.30pm Online meeting
Motherwell 19/09/2023 at 6.30pm Motherwell Fire Station
Page 12 of 118

Page 13

meetings.  Approximately 193 people attended the twelfth cycle of meetings with 48
community organisations and 68 Community representatives in total represented. 
2.2 A broader range of community representation is generally in evidence at Community
Board meetings. Three new organisations attended three of the Community Boards in
Cycle 12. 
2.3 Efforts continue to further extend the reach of community involvement in the work of
the Community Boards. As stated within previous reports to committee, not all
community organisations’ identity is place-based. There is therefore a need to ensure
that people who come together because they share characteristics and identity also
have a platform where they are heard and can influence both decision-
making and the realisation of the Plan for North Lanarkshire. 
2.4 The categories of participants in Cycle 12 Community Boards are as set out in Table
2 below: 
Table 2 - Participants (Cycle 12) 
Participants at Community Boards (Cycle 12)
Community Councils  Tenants and Residents Associations 
Historical/Cultural Groups  Community Forums 
MSYP/Youth Fora Police Scotland 
Scottish Fire & Rescue  NHS Lanarkshire 
Voluntary Action North Lanarkshire  NL Disability Access Panel
Elected Members  Council Officers
Faith Groups  Parent Councils
Local people/residents  Voice of Experience Forum 
Community Organisations  African Collaborative 
Participation in meetings 
2.5 There was a small increase in participation at this cycle of meetings overall in
comparison to the previous cycle of meetings at end of May/beginning of June 2023
however there was a slight decrease in the number of Community Groups
represented.  As reported previously, whilst some Boards experienced a reduction in
attendance as the Boards returned to face-to-face meetings others experienced an
increase in attendance. 
Agenda items 
2.6 During Cycle 12, eight out of nine Community Boards had agenda items put forward
by community groups and organisations in advance of Board meetings.  Examples of
Agenda items put forward included: Development plan and entertainment licences in
Northern Corridor; Riverbank school issues regarding travel in Coatbridge; Illegal use
Page 13 of 118

Page 14

of quad bikes in Airdrie; Drug and substance abuse issues in Wishaw, Flood
Management issues in Kilsyth; Bellziehill Junction in Bellshill; Pet food bank and
Cottage Trust in Cumbernauld and Town Action Plan and Henderson Theatre in
Shotts.  In addition, local community organisations provided updates on the work they
are carrying out locally.  These included Moira Anderson Foundation, Social Track,
Cairnlea Church, and Recovery Café. 
2.7 Council officers were also asked to attend or provide updates to Board meetings in
response to agenda items and issues raised by community representatives. Council
and Community Planning Partnership Partners will continue to be invited to attend in
relation to specific agenda items raised. External organisations are also invited to
attend Board meetings in response to agenda items raised by communities as
required. 
Opportunities to provide updates and share views. 
2.8 As previously reported, all nine Community Boards endorsed Local Outcome
Improvement Plans (LOIPs) which have been published and can be accessed via this
link. Community Board agendas are now organised around LOIP priorities and
updates from communities and partner agencies are linked to priorities where
possible to ensure clear focus on progress towards achieving actions to address the
key priorities that were identified by local communities.  Local people can also raise
ad hoc issues or share local information through the Community Matters section of
the agenda. 
Positive progress continues to be made with subgroups meeting to progress agreed
actions to address local priorities where this is the most appropriate mechanism. 
Work is ongoing and meetings are taking place and scheduled with local community
groups and organisations to further develop subgroups. 
Special Board Meetings 
2.9 Northern Corridor Community Board had previously requested a special meeting to
discuss Planning and Education issues identified within the Northern Corridor.  An
online briefing and consultation event has taken place in relation to this.   At this cycle
of meetings, Airdrie Community Board requested a working group be established
regarding illegal use of quadbikes within the Caldercruix area. 
Community Board Local Development Programme (LDP) Projects 
2.10 As previously reported, community organisations requested a positional statement
regarding outstanding Local Development Programme projects.  The LDP report,
continues to be split by Community Board area, and detailing the status of projects,
was circulated in advance of Cycle 12 Board Meetings. The project proposal form
identified in previous reports to committee, continues to be utilised to record LDP
project ideas and suggestions put forward from local communities.  LDP continues to
be a set item on the agenda at all Community Board meetings and is subject to a
separate report to this committee.   
Involving Communities 
2.11 Cycle 12 meetings saw continued involvement of seldom heard voices in Community
Board meetings. The Community Partnership team will continue as a priority to
proactively work with local community groups and people with lived experience to
support this objective.
Page 14 of 118

Page 15

2.12 As reported previously there has been a decrease in the level of youth representation
noted at Community Board meetings.  As reported previously, part of the Youth
Participation structure that was noted and approved at the Education, Children and
Families Committee on Tuesday 13th September 2022, CLD Youth Workers and
Community Partnership Team will engage with young people through the 9 local
youth voice groups to ensure that young people are active participants in the
Community Boards.  This will be subject to further discussion with CLD and
Community Partnership Team in relation to progressing this. 
Young people have become more involved within LOIP subgroups such as Youth
Participation and Engagement.  Youth engagement subgroups continue to plan and
carry out consultation with young people locally to ascertain their needs in relation to
LOIP priorities.   
Two MSYP attended the Cumbernauld Board to provide feedback from the Youth
Engagement and Consultation subgroup and one young person from Cardowan
Community Meadow attended the recent Northern Corridor Community Board
meeting. 
Our Lives – An exploration of the lived experiences of North Lanarkshire’s   
2.13  Black, Asian, and other Minority Ethnic People 
The Our Lives Research exploring the lived Experiences of North Lanarkshire’s
Black, Asian and other Minority Ethnic people and responses from our community
planning, and other partners, has been published on the Council website. 
The Lead Officers Group is now working with representatives from each of the
minority ethnic communities to arrange feedback and begin to engage on the specific
issues the research highlighted for each of the communities.
Arrangements are being made for a presentation on the research recommendations
and progress to Community Board representatives in November. 
All Community Boards were asked to participate in an annual Equalities Monitoring
exercise that will enable Community Boards to determine how diverse they are and
how representative of the needs of different communities within the Board area
particularly those of identity.  Having this information will enable each Board to
understand whether groups are over or underrepresented and enable them to target
engagement or take action to fill diversity gaps within Board membership.  Further
information will be circulated in relation to this. 
Moving Forward 
2.14 Community Board Chairs 
Significant progress has been made from the second cycle of meetings where one
Community Board meeting (Airdrie) was chaired by a community representative to a
position where eight of the nine Community Boards were chaired by community
representatives.  In cycle 12, 7 out of the 9 meetings were chaired by Community
representatives.  Airdrie Community Board was chaired by an elected member in this
cycle but moving forward a volunteer from XACT has agreed to take on this role. 
Shotts Community Board was chaired by the Community Coordinator as currently
Page 15 of 118

Page 16

there has been no expression of interest from Community representatives to take on
the role. 
Community Board Development Programme 
2.15 As previously reported, the Council’s Talent, and Organisational Development (TOD)
team in conjunction with the Community Partnership Team have created an online
Hub offering all Community Board Members access to a wide variety of learning
resources with a focus on the key requirements identified in the Training Needs
Analysis previously undertaken with Board members. The resources will be available
on the Hub 24 hours a day, 7 days a week and are accessible from any device. The
resource has been developed to offer a blended learning experience, reaching out to
a range of learning styles. 
Progress is being made in the further roll out of the portal which was highlighted and
welcomed previously at NL Strategic Leadership Board. Currently 134 Community
Board Members have been issued with login details with 70 members, just over 50%
having logged into the portal and accessed different areas of the hub with the most
recent login being made on 13th August 2023. 
There was increased activity during June 2023 with members logging in which may
have been linked to LearnNL mandatory e-learning email reminders being sent to all
users. The TOD Team have explored ways to prevent Board members from
automatically being registered with NLC mandatory e-learning but have been unable
to find a solution to the issue. 
Additional information is currently being added to the Equality & Diversity area of the
Community Board portal and once complete Community Boards will be made aware
of this additional content. 
The Role of Chief Officers as Community Coordinators 
2.16 As previously reported, Community Coordinators are in place and attending their
designated Community Board Meetings.  Community Coordinator updates continue to
be a standing item on all Community Board agendas as well as participation in
discussion relating to a range of local matters. Community Coordinators meet with
key senior partners between Board cycles to discuss common matters, any
leadership action required, and to collectively consider input to future meetings. 
Future Board Meetings 
2.17 The next cycle of Community Board meetings will be held in November/December
2023. All Board meetings up to Cycle 10 took place online, however, following
consultation, with community group representatives and elected members who attend
Community Boards, all meetings in cycle 11 and all Board meetings except for
Bellshill were held in person. Feedback to the consultation from Community Boards
identified that most Boards preferred a mix of online and face-to-face meetings
moving forward. Some Boards have decided that they would prefer to meet online
over the winter months. 
2.18 As reported to Committee previously, a hybrid approach was tested at Motherwell
Community Board Meeting to be considered for use at future Community Boards. 
Although workable, unfortunately the system tested has proved not to be cost
effective and would not be able to be used in every Community Board area until IT
infrastructure is available in suitable locations.  
Page 16 of 118

Page 17

Further work will be undertaken to consider the best way to approach these
requirements on a corporate basis and the Community Boards will be kept updated
when further information is available.  It is hoped that a corporate solution will be
reached in the fullness of time with further input from Community Board members.     
The Cycle 13 meeting dates are set out in Table 3 below. 
Table 3 – Community Board Meeting Dates (Cycle 13) 
Community Board  Day Date
Shotts Tuesday 21/11/2023
Northern Corridor Wednesday 22/11/2023
Coatbridge Thursday 23/11/2023
Cumbernauld Tuesday 28/11/2023
Kilsyth & Villages Wednesday 29/11/2023
Wishaw Thursday 30/11/2023
Airdrie Wednesday 6/12/2023
Bellshill Thursday 7/12/2023
Motherwell Tuesday 12/12/2023 
Local Outcome Improvement Plans – Partnership Delivery, Monitoring, and
Management Framework 
2.19 As previously reported, the online LOIP monitoring, and evaluation framework is in
place. This is a management tool that is being used by community planning partners
to ensure that progress towards addressing key priorities that were agreed with local
communities is monitored, recorded, and reported.   
3. Measures of success 
3.1 Delivery of LOIP outcomes and increased levels of engagement with local
communities and partners, resulting in generally positive impacts on communities
across a variety of priorities and key issues identified through effective locality
planning and the implementation of the Community Boards, particularly in areas
where further consultation has been required.         
4. Supporting documentation 
4.1 Appendix 1 – Example of Cycle 12 Community Board Agenda. 
Stephen Penman
Chief Officer (Strategic Communication and Engagement) 
Page 17 of 118

Page 18

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 18 of 118

Page 19

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 19 of 118

Page 20

Appendix 1
Community Board Agenda (Cycle 12)     
AGENDA (example)
1. Welcome and Introductions     
2. Apologies 
3. Minute of previous meeting and matters arising 
4. Local Outcome Improvement Plan (LOIP) - Local Priorities 
5. Community Matters       
i. Local issues put forward by local communities. 
6. Local Development /Investment 
i.Local engagement/consultation 
ii.Funding opportunities 
7. Standing Agenda items 
i.Community Coordinators Up-date 
ii.Local Development Programme (LDP) up-date 
8. AOCB 
 CommUnity Agreement Up-date
 Equalities Annual Exercise
 Challenge Poverty Week 
9. Date and time of next meeting 
Page 20 of 118

Page 21

North Lanarkshire Council
Report
Communities Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    SP/MC Date 30/10/23 
Community Board Local Development Programme 
From  Stephen Penman, Chief Officer (Strategic Communication and Engagement) 
E-mail Penmanste@northlan.gov.uk 
Costellom@northlan.gov.uk  Telephone 07725289559 
Executive Summary
This report provides an update on progress with the Community Board Local
Development Programme (LDP) projects previously approved by committee. 
In addition, the report seeks in principle approval for new potential projects as proposed
by local community groups. 
Recommendations
It is recommended that the Communities Committee:
(1) Recognises progress with the remaining 2022/23 programme and 2023/24
onwards and approve projects which have potential for delivery in future financial
years depending on availability of budget and community support (Appendix 1);
(2) Recognise the capital budget allocated to the LDP for each Community Board area
in the current capital programme (Appendix 2);
(3) Approves amendments to existing projects and further project proposals and
project criteria;
(4) Acknowledge current challenges faced in achieving delivery of the Local
Development Programme;  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (20) Improve the involvement of communities in the decisions,
and development of services and supports, that affect them
Programme of Work All Programmes of Work
Item 4
Page 21 of 118

Page 22

1. Background 
1.1 The Policy and Strategy committee agreed, in March 2019, that all projects from
2019/20 onwards, recommended by Community Matters partnerships (now replaced
by Community Boards) should be subject to agreement by the former Youth,
Equalities and Empowerment Committee before proceeding beyond the in-principle/
conceptual stage. Further approvals will now be sought through the Communities
Committee as required. 
1.2 Budget details have been finalised as part of the council’s Strategic Capital  
Investment Programme for the five-year period from 2021/22 to 2025/26, with an
agreed allocation of £1.5m for each of these financial years.  An additional £500k was
approved as part of the council’s revenue budget for 2021/22. These sums are
reflected in the breakdown of funding included in Appendix 2. 
1.3 The amount allocated to each area reflects a reduction of up to 10% which will be
earmarked for delivery and other associated costs in relation to agreed projects, this
will include technical support, tendering processes, design and project management
and administration. 
2. Report 
Criteria for Local Development Plan 
2.1 To be eligible for inclusion in the Community Board Local Development Programme,
projects must meet the priorities of the Local Outcome Improvement Plan and
substantially subscribe to previously agreed criteria. The following are examples of
some of the key criteria: 
• link to LOIP priorities
• be publicly visible and accessible;
• come from community groups or individual;
• improve community safety;
• benefit a large number of people;
• improve the appearance of an area
• maximise the use of alternative sources of funding.
• be a capital projects on council owned land 
All Local Development Programme proposal forms should indicate which, if any, of 
the Local Outcome Improvement Plan priorities the project supports. Where the 
project does not align with identified priorities, evidence must be provided to show 
how the project will support improved local outcomes.  
2.2 Project progress 
• Information on current and potential future projects is contained within Appendix 1.
• Please note the figures in Appendix 1 are notional/indicative potential project
costs and that no budget has been allocated to specific projects.  
• The Community Board Local Development Programme highlights the council’s
commitment to community led neighbourhood regeneration.
• Prioritisation work has been undertaken taking account of the allocated budgets
and criteria to schedule project delivery of the current holding over the five-year
Page 22 of 118

Page 23

budget cycle.  These priorities may change as projects develop and clearer costs
become available.
• Where feasibility checks have identified that the project is not viable, the
recommendation within Appendix 1 is to delete such projects from the list moving
forward. 
2.3  Projects seeking approval 
Table 1 below, provides a summary of the LDP projects seeking Committee approval
in this cycle.   
Table 1. Projects seeking approval from this cycle of Community Boards 
Community
Board Area
Project Name  Project
Description 
Project
Potential
Cost 
Additional
external or
partner
funding
available 
Additional Notes 
Airdrie Crowwood
Road,
Calderbank 
Parking   £15,000    Approved at CB on
6th Sept 23 
Airdrie Glen Road,
Petersburn 
Parking  £10,000    Approved at CB on
6th Sept 23 
Airdrie West
End/Centenary
Park 
New
interpretation
boards 
£15,000   Approved at CB on
6th Sept 23 
Bellshill Redwood
Crescent –
community
garden  
Project to
create a
community
garden  
£30,000    LDP proposal form
submitted. Project
approved at board
meeting on 8th
June. 
Feasibility checks
required. 
Bellshill Laburnum Rd –
footbridge and
environment 
To repair side
panels of an
existing
footbridge.
Addressing
litter and fly
tipping issues
and  
£30,000    Scope of works to
be determined and
discussed with
other services.
Project approved at
board meeting on
7th Sept. 
Bellshill Sycamore Ave
– community
garden 
To create a
community
garden/ dog
walking area  
£25,000    Project proposal
submitted for
discussion Project
approved at board
meeting on 7th
Sept. 
Bellshill Windsor Park –
Holytown
community
garden 
Project to
create a
community
garden 
£25,000    Project proposal
submitted for
discussion Project
approved at board
meeting on 7th
Sept. 
Page 23 of 118

Page 24

Community
Board Area
Project Name  Project
Description 
Project
Potential
Cost 
Additional
external or
partner
funding
available 
Additional Notes 
Bellshill Holytown
Main Street
community
garden 
Project to
create a
community
garden 
£25,000    Project proposal
submitted for
discussion Project
approved at board
meeting on 7th
Sept. 
Coatbridge Kelso
Quadrant
Community
space 
Create a
useable
community
space on
currently
unused waste
ground to
rear of
properties 
£10,000    Project Proposal
submitted, initial
community
consultation
completed, shows
positive support for
project. 
Coatbridge Shining Stars
Outdoor
Learning Space
Project 
Utilise space
at rear of
building to
create secure
learning and
performance
space for ASN
theatre
school 
£10,000    Initial feasibility
completed, project
proposal form
submitted. 
Cumbernauld Netherwood
Road 
(Westfield) 
Parking  £15,000    Addition parking
spaces 
Cumbernauld Cumbernauld
Peace Garden 
Memory
Walk 
£10,000    To be delivered by
Roads and
Maintenance –
Street Scene 
Cumbernauld Eastfield Play
Area 
Playpark  £100,000    Balloch site
identified,
proposal submitted
by local
community 
Kilsyth Argyll Place
Parking 
Additional
parking
spaces
required. 
£15,000    Proposal form
submitted.
Feasibility checks
complete.  Seeking
approval in
principle. 
Page 24 of 118

Page 25

Current Delivery Challenges 
2.4 As previously reported, delivery of the Local Development Programme has faced a
number of challenges during the current financial year due to a range of external
factors. Updates on the current challenges are as follows: 
• Cost Inflation. As previously reported, material costs have experienced
substantial cost increases over recent months. This has led to the appointed
contractor for the Bitumen Macadam (Bitmac) Repairs 2022-2026 contract
(Housing Property & Projects) withdrawing from the contract due to financial
viability. The Local Development Programme accessed this contract to deliver car
parking projects and therefore, the delivery of all such projects had been placed
on hold. Discussions have taken place with the Roads service who use this
contract and an agreement has been put in place. The parking projects are in the
process of going to tender on the procurement framework and work will
commence on these projects in the near future. 
• Labour Shortages. Ongoing market engagement continues to allow us to
develop accurate project timelines. Due to the demand on a relatively small
number of suppliers and specialist installers the Play Area projects will now have
an estimated site start date of six months from date of contract award. We will
continue to monitor the market position and adjust timelines as required. 
• Market Capacity and Demand.  The additional budget that will be provided to all
Local Authorities from the Scottish Government to improve play areas over the
next three years is expected to create additional pressure on a limited number of
suppliers and specialist installers. As previously reported project budgets have
been reprofiled and sites grouped together in lots to be more attractive to the
market. This approach has proved successful in attracting tender bids for all the
play areas which have recently been tendered.  We are currently undertaking a
procurement exercise for 15 play area/ MUGA projects, structured in tender lots in
this way to ensure continued delivery of best value whilst meeting community
aspirations. 
3. Measures of success 
3.1  Projects delivered within agreed timescales taking into account all relevant factors and
budgetary considerations. 
3.2 Local communities are involved from the earliest stage in the development of project
designs and delivery and are generally satisfied with the outcome. 
3.3 People in communities whose voices are seldom heard are engaged in putting
forward/influencing projects within their community. 
3.4 The governance role of the Community Boards is consolidated in terms of project
development, approvals and monitoring processes.   
Page 25 of 118

Page 26

4. Supporting documentation 
4.1 Appendix 1 – Community Board Local Development Programme 2022/23 onwards
4.2 Appendix 2 – Budget Information
4.3 Appendix 3 – Play Area Development List 2023/24   
Stephen Penman
Chief Officer (Strategic Communication and Engagement) 
Page 26 of 118

Page 27

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Each of the projects in the attached Appendices, if deemed appropriate for delivery
and where budget is available is supported through funding available via the
Community Board Local Development Programme capital allocation. 
Consideration will also be given to maximising external and other partner
contributions where possible. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
Page 27 of 118

Page 28

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Several of the projects will have a positive effect on the local environment,
contributing to safer areas to play and addressing issues traffic congestion in
specific areas. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The LDP is discussed widely with community groups and local consultation will be
communicated as required.  In conjunction with local communities, a
communications approach will ensure that projects are promoted positively. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
There are no significant financial risks which have been identified at this stage in
the financial year, however this will continue to be closely monitored.  Some
projects may not proceed as a result of e.g., community consultation or site
investigations and outstanding budgets will be re-allocated to other projects which
will be reported to a future Community Board.  It should be acknowledged that
there are nationwide challenges in relation to supply of materials and there is also
an impact on material costs leading to potentially higher contract costs which could
impact on delivery of projects. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Page 28 of 118

Page 29

Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☒ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
Information is provided regarding upgraded and new play areas across North
Lanarkshire. 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒ 
Page 29 of 118

Page 30

Appendix 1
Airdrie
Projects Under development 2022 onwards- 
Project Name  Project
Description 
Project
Potential Cost 
Additional external or
partner funding
available 
Additional Notes 
Chapelhall/Bellside
Road parking 
Road parking  £40,000.00    Awaiting outcome of legal
issues (Approved previously
by Board) 
Four Isles Community
Centre 
Fencing  £10,000    Raised at community
board. 
Projects Seeking Approval- 
Project Name  Project
Description 
Project
Potential
Cost 
Additional external or
partner funding
available 
Additional Notes 
Crowwood Road,
Calderbank 
Parking   £15,000    Approved at CB on 6th Sept
23 
Glen Road, Petersburn  Parking  £10,000    Approved at CB on 6th Sept
23 
West End/Centenary
Park 
New interpretation
boards 
£15,000    Approved at CB on 6th Sept
23 
Potential Community Board LDP Programme 2022 onwards-  
Project Name  Project
Description 
Project
Potential
Cost 
Additional external or
partner funding
available 
Additional Notes 
Airdrie BMX/Pump
Track 
Funding to support
regenerating the
existing facilities,
or build a new
pumptrack. 
£10,000  £140,000  Approved at CB 8th March
2023. 
Further project
development work
required 
To progress to build
2024/25 
Holehills Development  Play Area
Kenilburn
Ave/Holehill Place 
£10,000  Housing developers
off site contribution 
Approved at CB 7th June
2023 
Hill Street Parking,
Caldercruix 
Create additional
parking bays 
£10,000    To be Delivered via
Surfacing framework. 
Brownsburn Park  Upgrade to paths  £17,000    Approved at CB 8th March
2023 
Whinhall Allotments  Environmental
works including
the installation of
new path, raised
beds and
associated ground
works 
£15,000  N/A  Approved at CB 8th March
2023 
Jarvie Avenue, Plains  Parking  £15,000    Approved at CB 8th March
2023 
Page 30 of 118

Page 31

Plains Community
Futures 
Upgrade play
facilities including
new equipment,
surfacing, paths
and seating 
£50,000  N/A  Works completed 
Plains Community
Futures 
Outdoor Gym  £24,200  £13,000 grants from
Consortium & Lottery 
Approved at CB Dec 22 
Deliver Year 3 
Gartleahill Play Area  Wheeled sports
area & refurb
existing play area 
£20,000  £80K will be allocated
from Scottish
Government Play Park
Renewal Programme 
Year 3 priority.  Wheeled
sports yr4 
Craigneuk play area 
Calderigg Place 
Creation of new
play area 
£100,000    A suitable site has been
identified to build a new
play area.  Part of current
year procurement. 
Community Safety -
CCTV 
Additional CCTV in
locality in
conjunction with
community safety
partners 
£25,000    Year 3 priority 
Chapelhall – Queens
crescent 
Improved parking  £15,000    To be Delivered via
Surfacing framework. 
Arndale Plains  Improved Parking  £15,000    To be Delivered via
Surfacing framework. 
Caldercruix  Heritage Project  £30,000    Works ongoing to be
completed in Autumn 2023 
Rawyards Roundabout  Environmental
Improvements 
£10,000    Veg clearance works
complete all other works
completed.   
Victor Street / Stemac
Lane Plains 
Parking
Improvements 
£15,000    To be Delivered via
Surfacing framework. 
Community Partnership
Initiatives 
Funding to support
partnership
initiatives 
£10,000     
Bellshill
Projects Under development 2022 onwards- 
Project Name  Project
Description 
Project
Potential
Cost 
Additional external
or partner funding
available 
Additional Notes 
McCracken Drive car
parking  
Additional parking
space 
£17500    Further information is
required for identifying
location and scope of
work.   
Lilac
Crescent  Community
garden or car parking 
Community garden
or car parking 
£30,000    Community consultation
completed on 7th
September 2023.
Consultation results will
inform the nature of the
project. 
Page 31 of 118

Page 32

Projects Seeking Approval- 
Project Name  Project
Description 
Project
Potential
Cost 
Additional external or
partner funding
available 
Additional Notes 
Redwood Crescent –
community garden  
Project to create a
community
garden  
£30,000    LDP proposal form
submitted. Project
approved at board meeting
on 8th June. 
Feasibility checks required. 
Laburnum Rd –
footbridge and
environment 
To repair side
panels of an
existing
footbridge.
Addressing litter
and fly tipping
issues and  
£30,000    Scope of works to be
determined and discussed
with other services. Project
approved at board meeting
on 7th Sept. 
Sycamore Ave –
community garden 
To create a
community
garden/ dog
walking area  
£25,000    Project proposal submitted
for discussion Project
approved at board meeting
on 7th Sept. 
Windsor Park –
Holytown community
garden 
Project to create a
community
garden 
£25,000    Project proposal submitted
for discussion Project
approved at board meeting
on 7th Sept. 
Holytown Main Street
community garden 
Project to create a
community
garden 
£25,000    Project proposal submitted
for discussion Project
approved at board meeting
on 7th Sept. 
Potential Community Board LDP Programme 2023 onwards-  
Project Name  Project
Description 
Project
Potential Cost 
Additional external or
partner funding
available 
Additional Notes 
Viewpark Gardens  Funding to
support
development of
potential works at
site 
£20,000    Moved to year 4 for
delivery in conjunction with
local group 
Community Safety –
CCTV Provision 
Additional CCTV in
locality in
conjunction with
community safety
partners 
£25,000    Year 3 Priority 
Rosevale Crescent
MUGA  
Potential MUGA
facility 
£30,000  £100,000 
(Contribution to be
checked) 
Part of current year
procurement. 
Clydesdale Rd/Mossend
Primary School – car
parking  
Extra car parking
spaces 
£35,000    Further consultation
required with Education
and Roads to determine
final proposal. 
Community Partnership
initiatives 
Funding to
support
partnership
initiatives 
£10,000      
Year 3 delivery. 
Page 32 of 118

Page 33

Gemini Grove, wall
entrance project  
Project to cut
through an
opening through a
low-level brick
wall for residents’
access to a public
car park.  
£5,000    Project will be delivered by
Summer 2023. 
Orbiston bing project  Tarmacking
existing paths in
the bing 
£10,000    Final design to be agreed.
Potential community
benefits for increase the
scopes of the project.    
Crowflat View – car
parking project 
Extra car parking
spaces  
£15,000    Consultation Completed.  
To be Delivered via
Surfacing framework. 
Napier Square (north
side) - car park project 
Extra car parking
spaces   
£20,000    Consultation completed. 
To be Delivered via
Surfacing framework. 
Bellshill Gateway -
community garden  
Project to create a
community
garden 
£25,000    Year 2-3 Priority –  
LDP proposal form
submitted.  
LDP contribution to existing
Gateway project for the
community garden
construction 
Baird’s Ave - play
facilities improvement
Project   
Upgrading play
equipment in an
existing play area 
£100,000    LDP proposal form
submitted.  
Consultation and play area
specification completed 
Project progress to
tendering     
Page 33 of 118

Page 34

Coatbridge
Projects Under development 2022 onwards- 
Project Name  Project
Description 
Project
Potential
Cost 
Additional external or
partner funding
available 
Additional Notes 
Shawhead Recreation
Space 
Play  0  New Supply  Project to progress under
New Supply as part of
Dunnotar Avenue project –
like for like replacement of
recreation space. 
Last Tram Project  Heritage  £10,000  £5,000 Active &
Creative Communities 
£1100 through 
Community Benefits 
Funding proposal
submitted. £20K required
to complete project. 
Projects Seeking Approval- 
Project Name  Project
Description 
Project
Potential Cost 
Additional external or
partner funding
available 
Additional Notes 
Kelso Quadrant
Community space 
Create a useable
community space
on currently
unused waste
ground to rear of
properties 
£10,000    Project Proposal submitted,
initial community
consultation completed,
shows positive support for
project. 
Shining Stars Outdoor
Learning Space Project 
Utilise space at
rear of building to
create secure
learning and
performance space
for ASN theatre
school 
£10,000    Initial feasibility completed,
project proposal form
submitted. 
Potential Community Board LDP Programme 2023 onwards-  
Project Name  Project Description  Project
Potential Cost 
Additional external
or partner funding
available 
Additional Notes 
Greenend Projects
Base 
Development of
temporary meeting
space/project base in
Greenend 
£45,000    Approved at 28th Nov 22
Board meeting.
Consultation widened to
include Sykeside as per
new T&R group 
Heritage
Way/Monklands
Canal Improvements 
Improvements 
Disabled parking bays at
Daisy Park side & possible
Pier replacement works 
£0   Parking works completed
by Greenspace
Management. Pier
replacement taken on by
Scottish Canals 
Dunure Place
Coatbridge 
Creation of parking bays
to alleviate congestion 
£20,000    Approved in principle
Project proposal
submitted 
Awaiting consultation 
Dunure Street
Coatbridge 
Dog walking area at
Dunure Street Coatbridge 
£15,000    Approved in principle.
Scheduling in progress 
Page 34 of 118

Page 35

Whifflet Park   Skatepark  £55,000    Works completed June
23 
Viewfield Rd
Coatbridge 
Environmental and road
safety improvements 
£40,000    Following additional
investigations no viable
project was established,
looking to remove.  
Safety Zone
Bargeddie 
Replace gate/fence at rear
of property to secure
outdoor space 
£0    Completed June 2023 by
Street Scene 
Greenend Wheeled
Sports Area   
Play  £30,000    Works completed June
2023 
Community Safety -
CCTV 
Additional CCTV in locality
in conjunction with
Community Safety
Partners 
£25,000    As required 
Kirkwood Local
Improvements 
Junior play area
development 
£60,000    Survey report
complete.  Design Brief
complete.  
Kirkwood Local
Improvements 
Dog walking area
development 
£15,000    Survey report complete. 
Scheduling in progress 
Margaret Street Park  Remove fencing &
upgrade lighting 
£1,000     Removal of broken fence
at entrance completed &
upgrade from single to
dual light in progress 
Summerlee Street  Parking and Environment  £6,000    Extension of footpath
along grass verge.
Scheduling in progress 
Carnbroe Welcome
Signage & Heritage
panels 
Signage on Roundabouts
re welcome & safe driving
& heritage panels to
safely screen mine cap in
community garden 
£10,000    Project requested by
CCAR – proposal
submitted, initial
feasibility completed.
Design process in
progress with CCAR 
Oak Place, Greenend
Parking Bays 
Creation of additional
parking bays to alleviate
congestion 
£20,000    Project identified by local
community to increase
bays adjacent to Oak
Place & alleviate
congestion. Feasibility
ongoing/subject to
services check and
consultation 
Community
Partnership
Initiatives 
£10,000     
Cumbernauld
Projects Proposal under development 2023 onwards-  
Project Name  Project
Description 
Project
Potential
Cost 
Additional external or
partner funding
available 
Additional Notes 
Cumbernauld Heritage
Project, Abronhill 
Heritage Project  £4,900    Further specialist advice
being sought. 
Mossywood Court,
Westfield 
Parking  £12,000    Further feasibility checks
required. Potential for 4
spaces. 
Page 35 of 118

Page 36

Ellisland Road, Kildrum  Parking  £15,000    Feasibility checks required. 
Darroch Way, Seafar  Parking  £15,000    Feasibility checks required. 
Afton Road 
(Kildrum) 
Parking/One Way  £15,000    Request for additional
parking: feasibility checks
underway. 
Request for one way
system out with
remit/scope of LDP funding.
Request passed to Roads
for consideration. 
Drumnessie Road
(Westfield)  
Parking
Improvements 
£10,000    Feasibility checks complete.
Project not feasible.
Topography does not allow
for development to be
considered. 
Birch Road  
(Abronhill) 
Parking  £45,000    Three proposals submitted.
Further investigation
required. This could be up
to 26 spaces.  
Ben Venue (Eastfield)  Parking   £15,000   Feasibility checks complete,
limited scope for
development 
Projects Seeking Approval- 
Project Name  Project
Description 
Project
Potential
Cost 
Additional external or
partner funding
available 
Additional Notes 
Netherwood Road 
(Westfield) 
Parking  £15,000    Addition parking spaces 
Cumbernauld Peace
Garden 
Memory Walk  £10,000    To be delivered by Roads
and Maintenance – Street
Scene 
Eastfield Play Area  Playpark  £100,000    Balloch site identified,
proposal submitted by local
community 
Potential Community Board LDP Programme April 2023 onwards-  
Project Name  Project
Description 
Project
Potential Cost 
Additional external
or partner funding
available 
Additional Notes 
Netherwood Place,
Westfield  
Parking  £15,000    Approved at Committee
May 2023 
Inchwood Road,
Westfield 
Parking  £15,000    Approved at Committee
May 2023 
Watch Us Grow  Environmental
improvement 
£10,000    Approved at Committee
May 2023 
Community Safety –
CCTV 
(Kildrum, Carbrain, 
(Abronhill) 
Additional CCTV
in locality in
conjunction with
Community
Safety Partners 
£25,000    Abronhill, Rowan Road and
Carbrain Primary installed
and operational. 
Ellisland and Carbrain Gully
planned installation
Page 36 of 118

Page 37

scheduled for early October
2023.  
Oak Road Football
Pitch, Abronhill 
Parking
Improvements 
£25,000    Reduced scale project to be
delivered via Surfacing
framework. 
Melrose Road,
Greenfaulds 
Parking
Improvements 
£20,000    To be delivered via surfacing
framework.   
Community Partnership
Initiatives 
Funding to
support
community
partnership
initiatives 
£10,000     
Millcroft Road, South
Carbrain 
Play Area
upgrade 
£80,000  £80,000  Contract awarded.
Consultation  undertaken 
August/Sept 2023. 
Braehead Road,
Kildrum 
Play Area
Upgrade 
£50,000  £50,000  Contract awarded.
Consultation  undertaken
August/Sept 2023. 
Kilyth
Projects Under development 2023 onwards-  
Project Name  Project
Description 
Project
Potential
Cost 
Additional external or
partner funding
available 
Additional Notes 
Kilsyth Old Peoples
Welfare Committee –
centre renovations 
Contribution
towards
improvements
works at Old
Library
(Burngreen) 
TBC    Organisation seeking third
party funding support for
essential building and
facility improvements.
Proposal will require to be
updated 
Projects Seeking Approval -  
Project
Name 
Project Description  Project
Potential Cost 
Additional external
or partner funding
available 
Additional Notes 
Argyll Place
Parking 
Additional parking spaces
required. 
£15,000    Proposal form submitted.
Feasibility checks
complete.  Seeking approval
in principle. 
Potential Community Board LDP Programme 2023 onwards-  
Project Name  Project
Description 
Project
Potential Cost 
Additional external
or partner funding
available 
Additional Notes 
Bogside Playpark   Play Park
upgrade 
£15,000  £50,000 Scottish
Government 
Consultation complete. 
Part of current year
procurement. 
Croy Community Hub  Outdoor
Community Space
(garden) 
TBC    Year 4 priority. Costings to
be determined and
community engagement
required. 
Page 37 of 118

Page 38

Proposal form submitted,
await checks and further
community consultation.   
CCTV  Community
Safety 
£10,000.00     
Banton Parking  Parking  £20,000.00    To be Delivery via surfacing
framework. 
Rennie Rd project
(MUGA) 
Requires
community group
involvement to
progress 
TBC    Year 4 priority. 
New group now formed,
ACPM/CPO to meet group
and discuss proposal 
Livingston Park Play
Park  
Upgrading of
facility     
£130,000  Contract awarded June
2023.  Onsite and
progressing. 
Community Partnership
Initiatives 
Funding to
support
partnership
initiatives 
£1,500     
Motherwell
Projects Under development 2022 onwards- 
Project Name  Project Description  Project
Potential
Cost 
Additional external or
partner funding
available 
Additional Notes 
George St Park, Leven
Street, Motherwell 
LDP form received
from the group
regarding
constructing a
walking Path round
the park, with bench,
Trim trail and a bog
garden etc 
Proposal Form Received. 
Early stages, validity checks
of project required. 
Rail Bridge Project,
Craigneuk 
Working with the
community to
develop a rail bridge
art project, which will
include the potential
for improvement
works on Glencairn
Road      
Early stages, validity checks
of project required. No
proposal form received to
date. 
Fyfe Drive, Forgewood
play park improvement
and expansion 
Replace missing
equipment and
consider adding some
more play equipment
to improve the park 
£80,000    Further discussion with the
local organisation and
community 
No proposal from received
to date. 
Duchess Park  New notice boards
and possible dog
waking area 
Further discussion with the
local community. Waiting
on confirmation that the
new notice board and
Page 38 of 118

Page 39

Duchess Park sign can been
replaced internally. 
George V Park (SEE
WISHAW) 
Play Park
improvement/
upgrade 
TBC    Further discussion as this
may become a joint project
with Wishaw. Consultation
and design specification
complete.  
Newarthill  Possible Path and
benches 
Further discussion to be
had with the Newarthill
community council. 
Community project next
to Motherwell fires
station 
TBC      Initial discussions taken
place to determine
feasibility and scope 
Projects Seeking Approval- 
Project Name  Project
Description 
Project
Potential
Cost 
Additional external or
partner funding
available 
Additional Notes 
Potential Community Board LDP Programme 2023 onwards-  
Project Name  Project
Description 
Project
Potential
Cost 
Additional external or
partner funding
available 
Additional Notes 
Newarthill Tree Lighting
project 
Community
Council want to
light up 5 trees
next to the
welcome to
Newarthill
entrance feature  
£15,000    Community Council has
submitted an LDP form.
Further development work
required. 
Further consultation with
other services underway 
Burnside Street/Doon
Street Play Area 
Play area upgrade  £10,000.00    Completed August 2023 
Newarthill Glenburn
Ave. Parking 
Parking  £10,000.00     
To be Delivered via
Surfacing framework once
in place. 
Community Safety
CCTV 
Additional CCTV in
locality in
conjunction with
Community Safety
Partners 
£25,000    Year 3 allocation. 
New Stevenston Play
area 
Additional
accessible play
equipment 
£20,000    Completed April 2023 
The Loaning
Motherwell 
Improvements to
play area 
£20,000  £100,000  Work completed 
September 2023 
Community Partnership
Initiatives 
Funding to support
community
partnership
initiatives 
£10,000    Approved at Community
Empowerment Committee. 
Page 39 of 118

Page 40

Sandy Beach Play Area
(Strathclyde Park) 
Play area upgrade    £120,000  Completed May 2023. 
Roman Road play area  Play Area  £140,000    Project arose from petition.
Community engagement
process completed.
Part of current year
procurement.
Robert Burns Avenue,
Newarthill 
Parking bays  £15,000    Further development work
to be undertaken 
Northern Corridor
Projects under development 2022 onwards - 
Project Name  Project
Description 
Project
Potential Cost 
Additional
external or
partner funding
available 
Additional Notes 
Auchinloch
Community
Council  
Auchinloch
Village green 
Provide access to
an outdoor green
space 
£12,000    Year 4 priority.    
Project identified through Auchinloch
Community Action Plan. Engagement
for project completed. Consultation and
surveys completed. 
Projects Team has met with group to
consider feasibility.    
Northern Corridor
Community
Volunteers Locality
Heritage Project 
Local heritage
project 
£19,000    Year 4 priority.    
Third party funding in support of
pending National Lottery Heritage Fund
application. 
Projects Seeking Approval - None for this cycle 
Project Name  Project
Description 
Project
Potential
Cost 
Additional external or
partner funding
available 
Additional Notes 
Potential Community Board LDP Programme 2023 onwards-  
Project Name  Project Description  Project
Potential
Cost 
Additional
external or
partner funding
available 
Additional Notes 
Community Safety
CCTV 
Additional CCTV in the
locality in conjunction with
community safety
partners 
£15,000    Year 3 priority 
Community Partnership
initiatives 
Funding to support
community partnership
initiatives 
£3,000    Year 3 priority 
Page 40 of 118

Page 41

Dunalistair Drive Play
Area, Millerston 
Replace play area  £60,000  £60,000 (Scottish
Government
Funding) 
Contractor on site August
2023. 
Moodiesburn Kelvin
Drive Wheeled sports
facility  
Wheeled sports facility  £20,000  £133,000
(Developers
Contribution) 
Year 3 priority. 
Feasibility and
consultation completed.    
Part of current year
procurement. 
Lochside Play Area,
Gartcosh 
Refurbish play area  £10,000  £80,000 (Scottish
Government
Funding) 
£5000
(Developers
contribution) 
Year 3 priority. 
Feasibility and
consultation completed.    
Part of current year
procurement. 
Car parking bays at
Blades Court, Gartcosh 
Additional bays on grassed
areas 
£15,000    Consultation to be
carried out. 
To be Delivered via
Surfacing framework
once in place 
Car parking bays at
Lochside, Gartcosh 
Additional bays on grassed
areas 
£15,000    Consultation to be
carried out. 
To be Delivered via
Surfacing framework
once in place 
Frankfield Road,
Cardowan MUGA (Multi
Use Games Area)
project 
.  £40,000  Final cost to be
confirmed. 
Year 3 priority. 
Feasibility and
consultation completed.    
Part of current year
procurement. 
Shotts
Projects under development  
Project Name    Project
Description   
Project
Potential
Cost   
Additional external or
partner funding
available   
Additional Notes   
Pauls Parcels (Food
Poverty Prevention
Group) 
Community
Garden / growing
space linked with
Salsburgh
Community
Council. 
 
Notional
third-party
contribution
of up to
£15,000   
Organisation in early
discussions with
National Lottery
Community Fund. 
Proposal form received
27/4/2023 and under
review by Community
Partnership Team. Project
dependent on securing
external
funding.  Potentially
allocated to year 4 or 5. 
Summerhill Place,
Allanton 
Car Parking  £20000      Proposal form received
21/4/2023. Project viability
to be checked by
Page 41 of 118

Page 42

Community Partnership
Team. Potentially allocated
to year 4 or 5. 
Torbothie access
Improvements 
Car Parking / Hard
standing area 
£5000      Awaiting submission of
proposal form from
resident. 
Salsburgh Community
Council 
Commemorative
Railway Hutch and
Wagon on Rails 
£15000      Proposal form received
29/3/2023 and under
review by Community
Partnership Team. 
Prioritisation exercise may
be required. Potentially
allocated to year 4 or 5. 
Salsburgh Community
Council 
Solar lighting at
outdoor
community space
to aide community
safety 
£5000
budget. 
 
  
Proposal form received
29/3/2023 and under
review by Community
Partnership Team. 
Prioritisation exercise may
be required. Viability being
checked by community
partnership team.
Potentially allocated to year
4 or 5. 
Salsburgh Community
Council 
King George V
Park path
renewal  
N/A  N/A  Proposal form received
29/3/2023 and under
review by Community
Partnership Team. 
Prioritisation exercise may
be required. Viability being
checked by community
partnership team and will
require other services
input. 
Stane Gardens, Shotts  Request for
additional benches
at Stane Gardens 
£6000    Proposal form received
14/4/2023 and under
review by Community
Partnership Team. Viability
being checked by
community partnership
team and will require other
services input. 
Salsburgh Community
Council 
Wider
improvement
programme for
King George V
Park 
TBC  TBC  Proposal form received
29/3/2023 and under review
by Community Partnership
Team. Prioritisation exercise
may be required. Viability
being checked by
community partnership
team. 
Benhar Road, Shotts  Wider community
safety and speed
mitigation
measures 
TBC  TBC  Proposal received 7th August
2023. Road being assessed
by NLC Roads. Feedback in
due course.  
Page 42 of 118

Page 43

Projects Seeking Approval-   
Project Name    Project
Description   
Project
Potential
Cost   
Additional external or
partner funding
available   
Additional Notes   
  
    
 
    
Community Board LDP Programme 2023 onwards 
Project Name    Project
Description   
Project
Potential Cost   
Additional external or
partner funding
available   
Additional Notes   
Salsburgh Heritage
Project   
PB approved
project to
establish local
heritage group
and features   
£20,000        Project complete -monitoring
procedures are ongoing.
Proforma to be completed.  
 
  
Shotts Currieside
Avenue   
PB approved
project.
Replacement of
existing play
area   
£20,000        Completed July 2023. 
Stane Corner Parking    Manse Road car
park lining and
directional
signage project
to be
undertaken
along with a
community
awareness
campaign to
promote car
park usage 
£10,000.00        Year 3 priority. Manse Road
car park signage and
resources ordered and
promotional campaign to be
taken forward. Supply and
installation of signage will be
delivered by roads
department. Further
engagement with Stane
Primary to progress
September / October.  
Shotts Leisure Centre
Outdoor Gym   
Outdoor gym    £30,000.00        Year 5 priority. Local
Community Partnership
Team to review proposal.  
Lochaber Road
Parking   
Parking    £30,000.00        Year 3 priority. Site visit
undertaken on 17th March
2023 regarding site layout.
To be delivered via Surfacing
framework once in place. 
Community Safety
CCTV   
Additional CCTV
in the locality in
conjunction
with community
safety partners   
£30,600.37      Programme of camera
upgrades and new
installations undertaken
including support towards a
deployable CCTV trailer. 
Hartwood     Funding to
support local
organisation
with play area
refurbishment   
£15,000 LDP for
year 3 
 
£70,000 EKF external
funding sourced by
organisation 
Contract awarded.
Installation  began 25th
September.        
Page 43 of 118

Page 44

Torbothie Rd   
Shotts   
Parking    £20,000        To be delivered via Surfacing
framework once in place. 
Salsburgh Feature
Lighting   
Project to install
lighting on
entrance
features and
war memorial   
£10,000        Currently assigned to Year 3.
Plans being drawn up for
implementation and
delivery. 
Hareshaw Play Area    Install additional
item of
equipment for
older children   
£5,000        Installation to be confirmed. 
 
  
Laggan Path    Parking    £10,000        Currently assigned to Year 4.
 
To be delivered via Surfacing
framework once in place. 
Muldron Terrace,
Shotts 
Development of
parking bays to
reduce
congestion  
£10000 notional
budget 
Approved at community
board 21/2/23. Allocated
year to be determined. To be
delivered via Surfacing
framework once in place. 
Potentially allocated to year
4 or 5. 
Community Partnership
Initiatives 
Funding to
support
community
partnership
initiatives 
£2000   Approved at Community
Empowerment Committee 
Wishaw
Projects Under development 2023 onwards- 
Project Name  Project
Description 
Project
Potential
Cost 
Additional external or
partner funding
available 
Additional Notes 
Newmains Community
Council - Bike Track or
MUGA 
Clarification on
project once
survey findings
received 
£70,000    Awaiting survey
results.  Follow up meeting
with Community Council
being arranged. 
Parking Cleland  Lack of parking at
Crossgates Ave,
Crosshill Dr &
Fraser St 
TBC    Project idea raised by local
community – Site visit
completed.  Further checks
required. 
Templars Gill  Environmental &
Woodland
improvements –
including
installation of bike
park 
Third party
contribution
TBC 
Potential of up to
£100,000 funding
from Sports Scotland
Facilities Fund 
Idea being developed in
partnership with Social
Track and Green Action
Trust.  Proposal to be
submitted in due course. 
Page 44 of 118

Page 45

Wishawhill Woodland  Environmental &
Woodland
improvements
around Wishawhill
Woods including
further
development of
pump track/cycling
facilities 
Third party
contribution
TBC 
Potential of up to
£100,000 funding
from Sports Scotland
Facilities Fund 
Idea being developed in
partnership with Social
Track and Green Action
Trust.  Proposal to be
submitted in due course. 
Projects Seeking Committe Approval - 
Project Name  Project
Description 
Project
Potential
Cost 
Additional external or
partner funding
available 
Additional Notes 
Potential Community Board LDP Programme 2023 onwards-  
Project Name  Project
Description 
Project
Potential
Cost 
Additional external or
partner funding
available 
Additional Notes 
Maxton Crescent   Phase 2 parking  £15,000.00    Consultation competed. To
be Delivered via Surfacing
framework once in place. 
Attercliffe Avenue Play
Area 
Replace Play area  £50,000.00  £35,000  Works completed, signed
off 17th July 2023. 
Coltness Welcome sign  Welcome sign  £20,000.00    Year 3 priority – Joint site
visits complete.
Consultation in
progress.  Project team
carrying out feasibility
checks to progress. 
King George V Play
area, Wishaw 
Replace Play area  £50,000.00  £100,000  Year 3 priority –
Consultation and Design
Specification completed. 
Kenilworth Avenue,
Wishaw 
Memorial Plaque
and Distance
markers 
£5,000.00    Year 3 priority -
Consultation with local
group underway. Awaiting
responses to clarify design
and location on site. 
Cleland MUGA  Creation of New
MUGA 
£70,000.00    Year 4/5 priority - Location
identified. Additional
funding required for project
(approx. £50-70K) 
Cleland Public Park  Refurb and extend
play area 
£55,000.00    Contract awarded.  Start
date TBC.  Joint
consultation underway with
supplier. Awaiting RPII. 
Lyman Drive Play Area  Replace Play area –
upgrade park 
£40,000.00    Year 3 priority - Part of
current year procurement. 
Community Safety
CCTV 
Additional CCTV in
locality in
conjunction with
community safety
partners 
£25,000    Year 3 priority – Projects
ongoing. 
Page 45 of 118

Page 46

Newmains Play Area at
Community Hub 
Improved play area
facilities in
conjunction with
local community 
£175,000    Contract
awarded.  Contractor now
on site, work commenced
W/C 4th September 2023. 
Overtown Brighter
Neighbourhood Group 
Outdoor Gym  £45,000    Year 3. Part of current year
procurement. 
Community Partnership
Initiatives 
Funding to support
community
partnership
initiatives 
£10,000    Approved at Community
Empowerment Committee  
Park Quadrant Parking  Junction
improvements 
£10,000    Consultation complete and
project will progress. To be
Delivered via Surfacing
framework once in place. 
Parkside Play Area,
Cleland 
Install new swing
bay 
£5,000  Contract awarded.
Installation by end of
financial year. 
Newmains Community
Council Village
Welcome Sign 
Creation of
Welcome Sign 
£20,000    Year 3 priority -  Early
stages of consultation
underway to develop
design specification. 
Branchalwood Estate,
Coltness 
Environmental
improvements 
£5000    Nature Walk
Upgrades.  Idea being
developed by local
neighbourhood
group.  Proposal form
submitted with location
plan. Discussed at
Community Board 31st
August 23. 
Page 46 of 118

Page 47

Appendix 2 
Annual
Total
Community Board
Airdrie Bellshill Coatbridge Kilsyth Motherwell Cumbernauld Northern
Corridor
Shotts Wishaw
Year 1 310,140 220,140 260,280 58,140 292,140 257,580 127,440 85,860 202,140
Year 2 232,605 165,105 195,210 43,605 219,105 193,185 95,580 64,035 151,605
Year 3 232,605 165,105 195,210 43,605 219,105 193,185 95,580 64,035 151,605
Year 4 232,605 165,105 195,210 43,605 219,105 193,185 95,580 64,035 151,605
Year 5 232,605 165,105 195,210 43,605 219,105 193,185 95,580 64,035 151,605 
Page 47 of 118

Page 48

Appendix 3
Play Area Development Update 2023/24
Community
Board
Project Name Project
Description
Project
Potential
Cost
Additional
external or
partner funding
available
Additional Notes
Airdrie Gartleahill play
area
Replacement
and upgrade
of existing
play area
£20,000 £80,000 Procurement to be
undertaken
autumn 2023
Airdrie Craigneuk play
area
New play area £90,000 £0 Procurement to be
undertaken
autumn 2023
Airdrie Holehill/
Kenniburn
Avenue
New play area £50,000 £0 Procurement to be
undertaken
autumn 2023 
Airdrie Moffat View
Play Area
Replace
existing play
area
£50,000  Work completed 
early September
2023 
Airdrie Plains Outdoor
gym
New outdoor
gym facility
£35,000 £0 Procurement to be
undertaken
autumn 2023 
Bellshill Baird’s Avenue
Park 
Improving play
facilities and
equipment at
an existing
play area  
£30,000 £70,000 Procurement to be
undertaken
autumn 2023
Bellshill Rosevale
Crescent/Calder
Park MUGA
project,
Mossend 
Multi-Use
Games Area
(MUGA)
facility 
£30,000 +
additional
external
funding 
£100,000
Developer
contribution 
Procurement to be
undertaken
autumn 2023      
Coatbridge Kirkwood Junior
Play area
New play area
for younger
chidlren
£40,000 £0 Procurement to be
undertaken
autumn 2023 
Cumbernauld Millcroft Road Upgrade Play
Area 
£80,000 Scottish
Government Play
Park renewal
fund 
Contractor
appointed,
installation due
November 2023
Cumbernauld Braehead Road Upgrade Play
Area 
£50,000 Scottish
Government Play
Park renewal
fund 
Contractor
appointed,
installation due
November 2023      
Page 48 of 118

Page 49

Kilsyth Bogside park Replacement
and upgrade
of existing
play area
£15,000 £65,000 Scottish
Government Play
Area Renewal
Fund
Contractor
appointed,
installation due
November 2023      
Motherwell The Loaning
Motherwell
Improvements
to play area
£50,000 £100,000 Scottish
Government Play
Park renewal
fund
Installation
completed
September 2023
Motherwell The Roman
Road
Improvement
and renewal
of a play area
£50,000 £90,000 Scottish
Government Play
Park renewal
fund
Procurement to be
undertaken
autumn 2023 
Northern
Corridor
Moodiesburn
Kelvin Drive
Wheeled sports
facility 
Wheeled
sports facility
£20,000 £52,000
Developers
Contribution
Expected delivery
Autumn 2023
Northern
Corridor
Frankfield Road
MUGA
New Multi Use
Games Area
£130,000  Procurement to be
undertaken
autumn 2023 
North
Corridor
Dunalistair Drive
Play Area 
Replacement
play area
£120,000   installation
September  2023  
North
Corridor
Lochside Play
area Gartcosh
Replacement
play area
£0 £80,000 Procurement to be
undertaken
autumn 2023 
Shotts Hartwood   Funding to
support local
play area
refurbishment 
£15,000   Installed
September 2023
Shotts Hareshaw Additional
play
equipment
£5,000  Installed
September 2023      
Wishaw Overtown  Outdoor Gym  £45,000    Procurement to be
undertaken
autumn 2023 
Wishaw Lyman Drive
play area
Replacement
play area
£0 £40,000 Scottish
Government Play
area renewal
funding
Procurement to be
undertaken
autumn 2023 
Wishaw Newmains  Improved play
area 
£150,000   Installation
September 2023
Wishaw Cleland Public
Park 
Refurb and
extend play
area 
£50,000.00    Installation
October 2023
Wishaw Parkside Install new
swing bay
£5,000  Installation
September 2023 
Page 49 of 118

Page 50

Page 50 of 118

Page 51

North Lanarkshire Council
Report
Communities Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    SP/MC/CB Date 30/10/23 
Community Safety: Resilience Planning 2022/23 
From  Stephen Penman, Chief Officer (Strategic Communication and Engagement)  
E-mail penmanste@northlan.gov.uk Telephone   07947997750 
Executive Summary
Effective resilience arrangements have been in place for some time in North Lanarkshire
to support communities in the event of poor winter weather conditions.  Preparations
have been further strengthened, with a Power Resilience Strategy also now in place to
support recovery from a future national power grid failure.  These actions recognise the
key role community organisations play in ensuring local support complements planning
established by the Council’s Corporate Resilience Management Team. 
The purpose of this report is to advise committee of progress made on current community
resilience planning and how it contributes to the Community Safety across the nine
Community Boards. 
Recommendations
It is recommended that the Communities Committee: 
(1) Acknowledge the progress made to date in relation to enhancing Community
Resilience planning across our local communities. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Resilient People
Item 5
Page 51 of 118

Page 52

1. Background 
1.1 Creation of nine Community Board areas in August 2020 provided an opportunity for
further targeted support to communities across North Lanarkshire in the event of poor
winter weather conditions.  As a result, a number of community organisations were
contacted with regard to hosting a resilience pack containing key items required to
support communities during poor and extreme winter weather.   
These resilience packs contain emergency equipment to help during adverse
weather conditions and have been made available to local community groups
across North Lanarkshire. For example, the holdall packs include shovels, gloves, hi
viz vests, torches, foil blankets and a first aid kit. 
The resilience packs are available for organisations with accessible premises to use
whenever required during wintery or adverse weather conditions, thanks to funding
provided by the Council. 
At the initial stage, 30 organisations agreed to host packs, with Greengairs
Community Council, Orbiston Neighbourhood Centre, Northern Corridor Community
Volunteers, Getting Better Together (Shotts) and Cornerstone House, Cumbernauld
among initial pack recipients. 
2. Report 
Development of Resilience Packs 
2.1 We listened to local community groups who, in conjunction with the Community
Partnership Team and Resilience Team colleagues, developed a pack that would go
some way to providing support in local communities that was accessible and
sustainable.  Local groups were contacted and asked if they wished to be part of the
scheme and to play a role in building community resilience and improving community
safety. 
Usage of Resilience Packs 
2.2 The packs are held in local accessible buildings across the nine Community Board
areas and the equipment can be provided to local groups who want to help, e.g., clear
areas of snow or ice on paths or pavements.  These emergency weather packs can
prove crucial in the event of stormy, wet, or wintery weather, especially in outlying
and difficult to reach areas. The packs provide a range of equipment to help keep
people safe and aid the efforts of volunteers. 
2.3 Throughout the period 2021 through to the summer of 2022, nine additional
organisations agreed to host resilience packs, ensuring wider geographical coverage
across the local authority area.  In addition to town centre locations in Airdrie,
Motherwell and Bellshill, and key locations in the Newmains, Forgewood and
Carbrain areas, rural villages including Auchinloch, Salsburgh and Banton were also
included in resilience activity, providing an increased level of support throughout
communities. 
2.4 As a result equipment has been used, in particular, to clear snow of pavements in
several communities.  For example, volunteers and staff form Glenboig Development
Trust helped clear snow and ice from around their premises and local homes to assist
local people, including older people, to visit premises whilst hosting their Community 
Page 52 of 118

Page 53

Drop-in warm hub from December 2022 until March 2023. Service users subsequently
reported this action helped reduce social isolation and ensured they accessed a regular
hot meal and daily group activities. 
2.5 Throughout the summer of 2022, a review of winter resilience arrangements was
carried out which highlighted the need for closer alignment with council plans regarding
recovery from a future national power grid failure. As a result, extension to wider
community resilience has ensured streamlining of support and delivery, which to date,
has helped increase the number of current resilience pack holders to forty-two
community organisations across a range of geographical communities in North
Lanarkshire. 
Further community engagement 
2.6 In September and October 2022, online planning sessions were carried out to identify
assistance required by organisations who hold resilience packs and to underline the
type of assistance they could provide to local communities. Additional items for
resilience required within resilience packs was identified, including wind-up torches,
radios, and two-way radios. Subsequently, wind-up torches and radios were purchased
to be included within packs, with further research required at that time regarding
purchase of appropriate two-way radios. 
2.7 In early 2023, officers met with representatives from RAYNET (Radio Amateurs
Emergency Network), regarding accessing appropriate two-way radio equipment that
would best support pack holders with local communications in the event of a potential
national power grid failure. RAYNET is a voluntary organisation with 70 years’
experience of providing communication support across the UK, and to other Scottish
Local Authorities. As a result, 80 two-way radio sets, additional batteries and
earpieces were purchased for distribution to pack holders from September 2023.  
A further engagement event was held in September 2023 with 18 local community
organisations who are either pack holders or wish to become pack holders that will
further strengthen resilience assistance, provide initial training around the use of the
two-way radios and additional governance support. A usage agreement and annual
review sheet have been created to help track usage of packs, when equipment and
materials require to be replenished, and gaining pack holder agreement to store all
equipment securely and maintain equipment in good condition. 
Making communities safer 
2.8  The resilience packs have helped improve community safety in a way that is led by 
local community organisations and volunteers.  Providing this equipment has led to 
increased community safety and local communities volunteering to make their own 
communities safer.  Pavements and paths are clearer, and safer for people to go 
about their normal business which can positively impact on potential isolation for 
some who wouldn’t otherwise be able to go out of their homes. 
There are many outstanding local organisations and volunteers throughout North
Lanarkshire who go above and beyond to help others, and through our funding for
these packs, we are providing practical support.  The enhanced packs will provide
further equipment and material that supports community resilience and community
safety benefits for local communities in the event of emergency situations.  This
approach has been recognized as good practice by the Scottish Community Safety
Network. 
Page 53 of 118

Page 54

Our Community Partnership team will continue work with local support
organisations to ensure they have the equipment needed in their areas and will
ensure it is replenished when required. 
3. Measures of success 
3.1  The continued delivery of actions to strengthen community resilience across North
Lanarkshire in the event of poor weather conditions and to support recovery from a
future national power grid failure.   
4. Supporting documentation 
4.1 Appendix 1 – List of current resilience pack holders
4.2 Appendix 2 - List of pack items
4.3 Appendix 3 - Copy of usage agreement.
4.4 Appendix 4 – Power Resilience Strategy 
Stephen Penman
Chief Officer (Strategic Communication and Engagement) 
Page 54 of 118

Page 55

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The equality impact assessment for the Annual Review of the Community Safety
Strategy 2020/21-2021/22 has identified a positive impact associated with all
protected characteristics given the broad scope of the strategy and corresponding
actions 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☒
Page 55 of 118

Page 56

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 56 of 118

Page 57

Page 57 of 118

Page 58

Appendix 1
Resilience Packs Organisations
Airdrie (central) Lanarkshire Carers Centre
Airdrie (central) Diamonds in the Community
Airdrie (Glenmavis) Airdrie New Monkland Parish Church 
Airdrie (Greengairs)  Greengairs Community Council
Airdrie(Plains) St Philips School
Airdrie (central) Bear Necessities   
Airdrie (Longriggend) Longriggend Village Association
Bellshill (Mossend) Lanarkshire Muslim Welfare Society 
Bellshill (Orbiston) Orbiston Neighbourhood Centre
Bellshill (Thorniewood + Viewpark) Thorniewood Community Council
Bellshill (Town centre) Bellshill Salvation Army
Coatbridge (Kirkshaws) Kirkshaws Neighbourhood Centre
Coatbridge (Bargeddie) Lanarkshire Community Food & Health Partnership
Page 58 of 118

Page 59

Coatbridge (Langloan) St Augustine’s Outreach
Wishaw (Cambusnethan) MADE4U IN ML2
Wishaw(Gowkthrapple) CentrePoint Community Hub
Wishaw (Newmains) Newmains Community Trust Centre
Motherwell (Forgewood) Forgewood Housing Cooperative
Motherwell (Craigneuk) Craigneuk Lifelong Learning Centre
Motherwell (Town centre) Dalziel St Andrew’s Parish Church 
Motherwell (Craigneuk) Glencassels Community Development Project, premises:
The Venny, Craigneuk 
Motherwell (North Motherwell)  St Bernadette’s Catholic Church
Motherwell (Jerviston) African Collaborative group
Cumbernauld (Wardpark Industrial Estate)  Cumbernauld Action for Care of the Elderly (CACE)
Cumbernauld (Carbrain)  Carbrain Free Church of Scotland
Cumbernauld (Kildrum) Cumbernauld YMCA/YWCA
Cumbernauld (Town Centre) Cornerstone Community House
Page 59 of 118

Page 60

Cumbernauld (Seafar) Cumbernauld Poverty Action
Cumbernauld (Westerwood) Westerwood @ The Double Tree/Hilton Hotel
Cumbernauld (Cumbernauld Village) Cumbernauld Village Community Council
Northern Corridor (Muirhead)  Northern Corridor Community Volunteers
Northern Corridor (Auchinloch)  Auchinloch Community Council
Northern Corridor (Glenboig)  Glenboig Community Trust
Kilsyth and Villages (central) Storehouse Church
Kilsyth and Villages (central)  Kilsyth Community Fire Station
Kilsyth and Villages (Banton) Banton and Kelvinhead Community Centre
Kilsyth and Villages (Queenzieburn)  Queenzieburn Community Hall
Kilsyth and Villages (Croy)  Croy Community Hub
Kilsyth and Villages (central)  St. Patrick’s Church
Shotts (Allanton)  Allanton Miners Welfare Social Club
Shotts (central)  Getting Better Together Ltd
Shotts (Salsburgh) Salsburgh Community Council
Page 60 of 118

Page 61

Appendix 2
Resilience Pack Resources
Item  Number of items per group/pack
Rucksack/Cargo Bag 1
Yellow Hi-Vis Vest LARGE 20
LED head torches  20
Cold Weather Grip Gloves 20
Emergency foil blankets 100
First Aid Kit 1
Holdall 1
Safety Whistle  20
Hand Warmers 100
Torch 20
Page 61 of 118

Page 62

Snow shovels 20
Compact megaphone  1
Batteries - AA 40
Batteries - AAA 60
Batteries - D 4
Two-way radios 1
Earpieces and spare radio battery 1
In-Car Chargers 2
Additional Backpacks 1
Wind-Up Radio 2
Wind-Up Torch 2
Page 62 of 118

Page 63

Community Resilience Pack Holders
Usage Agreement
Name of Community Organisation:
Email address:
Location of Community Resilience Pack:
Location of two-way radios (if different from above):
Agreed actions of Community Organisation
• Ensure all resilience equipment is stored securely and kept in good condition.
• Ensure two-way radios are kept as dry as possible.
• Ensure two-way radios are available and ready for resilience purposes.
• Ensure that rechargeable batteries are ready for use and kept fully charged.
• Maintain regular familiarisation with two-way radio sets.
• Ensure damages or faults are immediately reported to the Community Partnership Team.
• Ensure equipment needing replenished is reported to the Community Partnership Team.
• Provide two contacts within the organisation with responsibility for the resilience packs and two-
way radios (including name, email addresses and contact number).
• Identify secure and dry location for all equipment.
• Ensure equipment given out is returned to the organisation following usage.
• Ensure	that	Community	Partnership	Team	is	notified	of	any	changes	to	contacts	or	location	of
equipment.
• Return an Annual Review sheet each September to the Community Partnership Team regarding
usage of the Community Resilience Packs and two-way radios.
Appendix 3
Page 63 of 118

Page 64

Privacy Statement 
How your information will be used.
The data you supply to us is held and processed under the terms of the UKGDPR and the Data
Protection Act 2018. The information provided on this form, including personal details, is only
used in the processing of your Usage Agreement. Your information will not be used for any other
purpose.
Signatures
Two members of your Community Organisation should sign and return this working agreement to
Community Partnership Team.
Name:
Signed: 
E-mail address:
Contact Number:
Date signed:
Name:
Signed:
E-mail address:
Contact Number:
Date signed:
For further information, contact The Community Partnership Team at:
CommunityMatters@northlan.gov.uk Page 64 of 118

Page 65

1
North Lanarkshire
Council
Power Resilience Strategy
Document Control
Version / Dated Oct 22 Next Review Date
Approved by Document Editor
Appendix 4
Page 65 of 118

Page 66

2 
Content Page
1.  Background and Purpose of Document 
2.  Planning Assumptions 
3.  Power Resilience Response Centre 
4.  Activation 
5. Governance 
6. Critical Services 
7. Communications 
8. IT Capability 
9. Community Engagement/Resilience 
10. Power Resilience Volunteers 
11.  Food/Water 
12.  Recovery 
Appendices
1. Power Resilience Response Centre Map
2. PRRS Generator Monitoring/Maintenance Procedure
3. Power Resilience Response Kit
4. PRRC Activation Procedure
5. Key Contacts
6. PRMT Agenda
7.  Action Log
8. Social Care Power Resilience Procedure
9. Fleet Power Resilience Procedure
10. Housing Solutions Power Resilience Procedure
11. Asset & Procurement Solutions Power Resilience
Procedure
12. Communications Power Resilience Procedure
13. Roads Power Resilience Procedure
14. Message Template
15. Public Assistance Centres
16. Public Information Boards
17. Example Information Notice
18. Power Resilience Support Team
19. Black Start Initial Response Procedure/ Confirmation of
contact – Key Personnel 
Page 66 of 118

Page 67

3 
1.  Background
A Black Start event is the name for the recovery process following a complete (or partial)
shutdown of the Great Britain (GB) electricity system (National Electricity Transmissions
Failure), where the planning assumption is full power restoration could take up to seven
days. The timeframe to a full power cut is likely to be less than 2-minutes, meaning there will
be no preparation time.                                                                                                                                                      
The planning arrangements for such a recovery process are described under the term Power
Resilience. Within the last United Kingdom Government National Risk Assessment, Black
Start is rated with medium likelihood and significant impacts.
Although the Council has well documented and comprehensive business continuity planning
measures in place, all of these are based on the assumption that there will be a national
power supply available. As a consequence, the Scottish Government have requested that in
addition to normal business continuity arrangements all public bodies should also have a
stand-alone Power Resilience Strategy which would be enacted in the event of any failure of
the national grid system.
In short, the delivery of any Council Services during a Black Start event will be limited to
those critical services which are required to preserve life and every available resource
available to the Council during this event will be dedicated to this task. All other normal
Council services and priorities will be suspended over this time.
The aim of this document is to provide a framework for and to enhance the Council’s power
resilience arrangements. The objectives of this plan are to:
• Outline and develop arrangements to be progressed in preparation for a Black Start.
• Establish an activation framework to ensure an appropriate response to these
conditions.
• Outline the measures to ensure effective communications with the community,
Council Officers, Elected Members and partner organisations.
• Facilitate a corporate, coordinated response to Black Start.
• Provide the framework for continued provision of essential services to the community
to protect human life.
• To minimise the harmful effects of the emergency.
• Suspend all non-critical services to maintain and enhance essential services at an
appropriate level.
• To provide mutual support and co-operation between responders. 
• To open and operate community-based emergency Public Assistance Centres.
• To support the local community and their part in response and recovery.
• To promote a swift return to a normal life. 
Page 67 of 118

Page 68

4 
2. Planning Assumptions
This Power Resilience Strategy is based on the following planning assumptions: 
• The National Electricity Transmission System (NETS) failure is identified by the Scottish Risk
Assessment (SRA) as a High civil emergency risk. 
• Government support will be limited so local responders need to manage the incident with local
resources. 
• Power resilience planning arrangements assume no power for a period of up to 7 days but
many of the legacy impacts will take longer to resolve. 
• Business continuity impacts on private, public and third sector organisations, including
transport, finance, retail, manufacturing, and the production and distribution of food and fuel will
place unprecedented, unconventional demand on emergency responders to sustain critical
services and support communities. 
• Total failure of the NETS will impact multiple sectors and disrupt day to day activities creating
direct and indirect threats to life and challenges for operational capacity.
• Impacts will be widespread and cumulative as infrastructure and sectors struggle, further
compounding challenges.
• Continuous Airwave radio operation is not guaranteed, mobile telephony and access to the
internet / internet telephony will not be available. Limited landline and RAYNET capability may
be available in some areas.
• Partners will develop specific power resilience business continuity plans.
• The anticipated timeline for the restoration of mains electricity supplies from the initial point of
a failure is noted below: 
Timeline Recovery
Point of
failure
Point of failure to full NETS
failure is estimated at less than
two minutes, leaving no
opportunity for alert or
mitigation.  
0-2 Hours Some power stations expected
back online as part of re-
establishing the National Grid
but where and when unknown. 
2-6 Hours Power progressively restored to
customers (circa 5%) as power
stations restart and form power
islands.
6-12 Hours Power islands begin to join up
to form skeleton transmission
network (circa 10% restored).
12-48 Hours Rota load disconnections used
to ration power if needed (circa
60% restored). 
2-7 Days Continuation of rota load
disconnections.
• Day 3 circa 70% restored
• Day 4 circa 85% restored
• Day 5 circa 90% restored
• Day 6 circa 95% restored
• Day 7 circa 100% restored
7 – 14 Days Potential of intermittent
widespread disruption via rota
load disconnection. 
• In looking for information, welfare support and security the public may gravitate to any place or
building with a functioning power supply regardless of its primary purpose, be that a hospital or
police station for example. 
• Public order and the security of premises may become an issue. 
Page 68 of 118

Page 69

5 
3. Power Resilience Response Centre
It will be critical to have a central Power Resilience Response Centre (PRRC) where the
response to the Black Start will be coordinated from. Obviously, this facility will have to be
power resilient. The Community Safety Hub, Unit 1E North Caldeen Rd Coatbridge ML5 4EF
will be the site for the strategic response to a Black Start event as at present this is the only
building in the NLC estate with back-up generator capability. The generator can provide
power for 5-7 days and can be refuelled while operating if fuel is available. A location map
for the facility is contained within Appendix 1 to this document. 
To ensure generator capacity is maintained, regular checks and testing of the generator are
undertaken by the Community Safety Hub which will also include sufficient fuel supply to
guarantee 7 days of operation. Further details on the testing is contained within Appendix 2
and will be implemented and monitored on an ongoing basis by the Community Safety Hub.
A Black Start Response Kit has been deployed at the Community Safety Hub. This has a
copy of the Power Resilience Plan and instruction for personnel at the Hub as to what action
should be taken immediately in the event of notification of a Black Start by Police Scotland.
A copy of the information and equipment contained within the response kit is contained at
Appendix 3.
4.  Activation
This protocol will be activated by Lanarkshire’s Divisional Chief Superintendent or Divisional
Superintendent, based on information passed to Police Scotland Service Overview by power
companies including SPEN who manage Lanarkshire’s electricity distribution network.
A NETS failure event will prompt Police Scotland to declare a Major Incident on behalf of
Scotland’s Resilience Partnerships. 
There will be no further information cascade by power companies whose priority will be to
restore power to the national grid.  Police Scotland Service Overview and Area Control
Rooms will therefore take responsibility to cascade notifications to Category 1 and 2
Responders. 
If during office hours, initial contact will be attempted by telephone to LRP partner resilience
leads and thereafter police officers will be sent to the headquarters / main offices of partner
responders.  If outwith office hours, contact will be attempted via details held by Police Area
Control Rooms.
Partners will provide representation at the designated local Multi-Agency Coordination
Centre (MACC) location (as detailed below) to facilitate management of the incident.
• Police Scotland Divisional HQ (127 Windmillhill Street, Motherwell, ML1 1RZ) 
Representation to the MACC will be through the Head of Regulatory Services and Waste
Solutions or in their absence the Resilience Development Co-Ordinator.
The local MACC will be co-ordinated by Police and partners will agree meeting frequency,
mindful that remote comms will be very limited, so face to face meetings may be the norm. 
The West of Scotland on-call Police Emergency Planning Adviser will inform the West of
Scotland Regional Resilience Partnership (WoSRRP) Co-ordinators who will advise multi-
agency partners if a Regional Resilience Partnership meeting is convened.
External Notification
Page 69 of 118

Page 70

6 
Police Scotland will inform the Council of the declared Black Start through contact with the
following key personnel:-
• Des Murray
• Derek Brown
• Andrew McPherson
• Teresa Murphy
• Community Safety Hub
This will be completed through an immediate SMS message to the designated phone
numbers and by a visit by a police officer to the Community Safety Hub.
Internal Notification
Following notification to the Community Safety Hub by Police Scotland the Black Start
response will be initiated by relevant personnel at the Hub which will then formally transfer to
the PRRC until such times as the Black Start event is stood down.
An appropriate Black Start Response Procedure (Appendix 4) is held within the PRRC and
this will be accessed by the nominated personnel within the PRRC. To facilitate this initial
response, all staff operating within the Community Safety Hub will immediately be deployed
to assist in the initial contact process. 
The first response will involve contacting all key personnel who will form the Power
Resilience Management Team and will be responsible for coordinating the Council
response. A full list of the key contacts is contained within Appendix 5 and will contain core
members of the Corporate Management Team and Corporate Resilience Management
Team. Members of the PRRC initiating this response will contact all key personnel and then
record how they have been contacted. This will be through several different options:
1. Global SMS message 
2. Telephone while available.
3. In person through a visit to the home address if there is no response to the above
two options.  
All contacts will be asked to attend the PRRC as soon as possible. On arrival at the PRRC
the Power Resilience Management Team (PRMT) will be stood up and this will be chaired by
the Chief Executive or in his absence the Head of Regulatory Services and Waste Solutions.
It will be the intention to commence the first meeting of the PRMT within two hours of the
initial notification of the Black Start event from Police Scotland. 
Page 70 of 118

Page 71

7 
5.  Governance 
The overall governance for the black start response is summarised in the diagram below: 
SGoRR – Scottish Government Resilience Room. 
When the scale or complexity of an emergency is such that some degree of central
government co-ordination or support becomes necessary, Scottish Government will activate
its emergency response arrangements through SGoRR. The precise role of SGoRR will vary
depending on the nature of the emergency.
SGoRR will:
• provide strategic direction for Scotland
• co-ordinate and support the activity of SG Directorates Page 71 of 118

Page 72

8 
• collate and maintain a strategic picture of the emergency response with a particular
focus on response and recovery issues
• brief Ministers
• ensure effective communication between local, Scottish and UK levels, including the
co-ordination of reports on the response and recovery effort
• support response and recovery efforts as appropriate, including the allocation of
scarce Scottish resources
• determine the Scottish Government's public communication strategy and co-ordinate
national public messages in consultation with SCGs and other key stakeholders
• disseminate national advice and information for the public, through the media
• if appropriate, liaise and work in partnership with the UK Government. 
SCG - Strategic Coordination Group 
Under the Civil Contingencies Act 2004 Category 1 responders have a duty to co-
operate/share information. This undertaken through Regional Resilience Partnerships
(RRP), and Local Resilience Partnerships (LRP). In cases where it becomes clear that the
complexity or scale of an emergency requires resources, expertise or co-ordination beyond
the capacity of the tactical level, it may be necessary to invoke the strategic level of
management to take overall command and set the strategic direction. Once this occurs,
tactical commanders will direct operations within the context of any direction or parameters
set by the strategic group. 
MACC/LRP 
A local Multi Agency Co-ordination Centre (MACC) will be convened at the Police Scotland
Q Division HQ at Motherwell Police Station, Windmillhill Street, ML1 1RZ to enable
communication and co-ordination of the response between partner agencies that make up
the Local Resilience Partnership (LRP) i.e. North and South Lanarkshire Councils, Police
Scotland, Scottish Fire and Rescue Service, Scottish Ambulance Service and Category 2
Responders (the Utility Companies). The frequency of meetings will be determined by Police
Scotland who will chair the meeting and North Lanarkshire Council will be represented at this
meeting by the Head of Regulatory Services and Waste Solutions (or Depute). Initially
Airwave handsets or mobile telephony will be used for communication between the MACC
and PRRC but in the failure of this designated runners will be required to communicate
information between the two groups. 
The on-call Police Emergency Procedures Advisers will also inform the West of Scotland
Regional Resilience Partnership (WoSRRP) Co-ordinators. WoSRRP Co-ordinators will
contact multi-agency partners in event that a Regional Resilience Partnership meeting is
convened. 
PRMT 
The role of the Power Resilience Management Team is to:
o Determine the strategic aim and objectives for response (see below). 
o Establish a policy for the overall co-ordination of the corporate response and
ensure appropriate resourcing and access to expertise at all levels. Page 72 of 118

Page 73

9 
o Liaise with strategic managers of other agencies and ensure that the aim,
objectives and policies are integrated with those of the LRP and Health and
Social Care Partnership (HSCP).              
o Liaise with the Local Resilience Partnership (LRP) / Police Scotland Divisional
Commander at the MACC at Motherwell Police Station.
o Integrate key communication with the public. Where possible establish liaison
with local radio.
o Prioritise the demands of tactical managers and allocate limited strategic
resources (such as fuel) and expertise to meet high priority tactical
requirements in line with prevailing environmental conditions.
o Provide a focus for liaison and communication with LRP (local Police
Scotland Divisional Commander).
o Where possible establish communication with the Leader, Senior Elected
Members, local Members of Parliament (MPs) and local/regional Members of
the Scottish Parliament (MSPs).
o Plan and co-ordinate recovery and a return to a state of normality.
The agenda for PRMT meetings will follow a standard format contained as Appendix 6
although the Chief Executive/ delegate will have discretion to vary the agenda as response
needs emerge. The agenda will focus on the critical services i.e. those services previously
identified by Heads of Service that are essential to preserve human life. All actions emerging
and agreed at the PRMT will be logged in accordance with Appendix 7 and the recording of
all meetings will be undertaken by a trained loggist. 
6. Critical Services 
All available resource of the Council will be focussed on the preservation of life and
accordingly all resources of the Council will be channelled into the following key critical
service areas: 
Service Area Purpose
Social Care To identify and support vulnerable persons
where there is risk to life or limb.
Fleet/ Fuel Provision of fuel and fleet vehicles to allow
delivery of key critical services throughout
the district.
Housing Solutions Delivery of services relevant to sheltered
housing complexes and high-rise buildings
and provision of accommodation for those
homeless either because of the Black Start
or otherwise.
Asset and Procurement Solutions Opening of key buildings that will be used in
response to Black Start and staffing of
these facilities.
Communications Initiate and maintain communication with
staff, the public and Elected Members
Roads In severe weather, keep access roads clear
for key personnel and emergency services
to critical buildings including care homes. 
Updates on all the above Services will be delivered through the standard PRMT agenda,
however specific Black Start response documents for each activity are included within
Appendices 8-14. These documents outline how that service will deliver its critical function. 
Page 73 of 118

Page 74

10 
It should be emphasised that throughout the period of the Black Start event, no other
service areas will be delivered by the Council and every resource will be channelled
into delivery of the above critical service areas. 
7.  Communications. 
Internal
The reasonable worst case planning assumption is that all forms of communication (mobile,
internet, and landline) will be lost immediately or degrade over the first day. Although any
short-term mobile connectivity (potentially up to 4 hours) will be exploited as much as
possible, this is not guaranteed and will not be a long-term option.  
Outwith the PRMT meetings detailed above, internal communication shall be maintained
through the following mechanisms taking into account this planning assumption.
• Air Wave Capability
There are 2 air wave radios currently held by the Resilience Development Co-
ordinator and Resilience Development Officer. On activation of this plan one will be
used in the PRRC and the second used by the representative at the MACC or as
required. The planning assumption will be that full Airwave connectivity will be
available. 
• Satellite Telephone System 
In the absence of any definite mobile telephone capability, satellite telephones/
batteries and chargers will be utilised to allow 24-hour connectivity with the Public
Advice Centres locations and key facilities such as Bellshill depot as required. The
hand-held units and batteries will be stored in the Community Safety Hub when not in
use. During an incident the batteries will be recharged as required in the PRRC. 
• Face to Face 
Council vehicles will be positioned at the PRRC and PACs and used to transfer staff
to allow face to face communication between PRRC and PACs, key staff, MACC,
external agencies and Elected Members. 
Where communication is made by any member of the public with any employee at
the PACs the details of this conversation/ request will be recorded in accordance with
the template message form contained at Appendix 15. The purpose of this will be to
ensure that the requests from members of the public receive a decision. 
External Partner Communication
Communication with Resilience Partners will be through attendance at the MACC meetings
by the Head of Regulatory Services and Waste Solutions or depute. 
Public Communication
Communicating with the public will be crucial to:
• Provide reassurance and alleviate concerns
• Provide practical information and support
• Outline what is being done to bring the situation to a conclusion 
It is inevitable in a Black Start event that people will panic as communication through the
normal channels (tv, digital, radio, print) will not be available. Alternative ways to
communicate to the public is therefore essential to deliver key messages providing
assurance that the incident is being effectively managed and that public order is maintained. 
Page 74 of 118

Page 75

11 
It has been identified that several Public Assistance Centres will be established and
supported by Public Information Boards which will provide updated information at key points
throughout the day 
Public Assistance Centres 
Public Assistance Centres (PACs) will be set up in 9 Council facilities, with one in each of
the nine Community Board areas. 
These facilities will be opened and staffed by council employees and a full list of the PACs,
together with a location map, is contained at Appendix 16. All PACs will have generated
power which will allow basic lighting, heat and the provision of hot drinks.  
The purpose of these facilities will be:
• To provide a destination where members of the public can physically attend to speak to
someone involved in the Black Start response and be provided with the most up to date
position. This will provide a physical point of contact which is an important part of the
response.
• To provide a base should emergency services require shelter or where emergency
supplies (water etc) can be dropped off and made ready for distribution. 
• A vehicle will also be deployed to each PAC which can be utilised in the event of any
emergency and to assist with communication with the PRRC.
• The intention will be to keep these facilities manned and operational 24 hours per day.
• Each PAC will be provided with a satellite telephone which will allow direct and
immediate contact with the PRRC.
• For operational and safety reasons, a minimum of three people will be deployed at each
PAC.
• Provide a facility of last resort for emergency evacuation/ shelter for any individual(s). It
should be emphasised that these facilities will not be used to make people comfortable;
rather only when they need shelter to prevent any threat to life e.g. passengers stranded
at a railway station in freezing temperatures. 
Due to these 9 facilities being power resilient, it will be likely that this will also draw unwanted
attention. At the outset of the Black Start event, details of the 10 PACs will be provided to
Police Scotland at the first meeting at the MACC which will allow use of the facilities of all
emergency services but also allow a police presence in and around the facilities when
required. 
The opening of each of the PACs is contained within the specific black start response
procedure listed at Appendix 11.
Public Information Boards
To complement the PACs, every primary school within the area will be utilised as a Public
Information Board (PIB). This will allow regular updates on the event to be posted at agreed
time frames. These time frames will need to be flexible, but at the start of the event updates
will be posted at 9am, 2pm and 8pm. The boards, where possible, will be placed and
secured to the front gate of the school but decisions will be made for the most appropriate
location at each school so that it is clearly visible and all information bulletins will be
highlighted so they are easily recognisable. Each PIB will also provide information on the
nearest PAC.
A list of all PIBs together with location maps are contained within Appendix 17 and an
example of the first information announcement is contained at Appendix 18.  
National Messaging
It is possible that members of the public will still have access to broadcasts (mobile phones
with power, car radios, wind up or battery powered radios etc) which will be maintained
Page 75 of 118

Page 76

12 
nationally throughout the Black Start period and accordingly the public will be advised to
listen for public service announcements through BBC Radio Scotland on the appropriate
radio frequencies. 
Elected Member Communication
All elected members have a supportive role to play within their local communities and they
will be provided with Black Start information packs which will provide the key messages of
the overall response e.g. position of the PACS/PIBs etc.
In addition to the information to be provided to every elected member, during any Black Start
event, regular visits will be made to the Leader and Depute Leader of the Council by a
representative from the PRMT to advise of the actions being taken. Where possible, visits
will also be made to all MP’s and MSP’s to provide a similar update. The frequency of any
face to face visits will be determined by the PRMT and will depend upon the level and
criticality of information available. 
7 IT Capability
In short, the assumption will be that there will be no access to any Council or national IT
systems through the PRRC due to potential power failures interfering with internet suppliers.
To address this issue and allow access to critical systems if required, arrangements are in
place with Data Vita. Seven disaster recovery desks will be available at the Data Vita base in
Chapelhall and appropriate location maps, access arrangements etc are included within
Appendix 14 
8. Community Engagement/Resilience
Irrespective of the effectiveness of the Council response and indeed that of our strategic
partners, key to the successful management of any Black Start event will be an effective
community response. To facilitate this, the Resilience Planning team together with the
Council’s Communities Team have engaged with local community organisations and all
Community Boards. This has allowed details of the action that will be taken in accordance
with this strategy to be conveyed which in turn will provide assurance to communities and
reduce the risk of public concern and civil unrest. Together with this, ‘Resilience Grab Bags’
have been provided to all key community groups. The purpose of these bags will be to
provide both information and equipment which will assist communities in dealing with events
affecting their local area. Along with the standard winter response equipment, this will also
include information and equipment to assist in the event of any Black Start event. This will
give details of PACs, PIBs and radio stations where national information will be broadcast
along with torches, battery operated radios etc. 
9. Power Resilience Support Team 
In addition to the critical service areas detailed above, there will be several routine tasks that
will require to be delivered throughout the period of the event – attendance at PACs, vehicle
delivery and refuelling, change of public information boards etc. To assist with this, a list of
volunteers has been established who will be deployed by the PRMT to provide the
necessary assistance and is contained at Appendix 19. This initial list will be the principal
contacts but depending on the extent of the event and unforeseen issues that may emerge,
the PRMT may need to commence further contact with other members of staff that would be
available through normal emergency contact details. 
Page 76 of 118

Page 77

13 
10. Water and Food Supply 
Water 
During a Black Start event the priority for Scottish Water will be to keep drinking water
flowing/available where possible with a focus on hospitals, prisons and critical national
infrastructure. Bottled or tankered water will not be supplied to Local Authorities however we
will where possible facilitate the distribution of water supplies through the PACs. 
Food 
It is not within the remit of the council to supply food to the public. Residents will be
encouraged to work together, supporting others through existing resilient community and
voluntary groups and this will be included within the information provided to communities
through the Resilience Planning Grab Bags. 
11. Recovery/Stand Down 
The PRMT will take the decision to stand down response measures, only once it is clear that
the ‘incident response’ phase has concluded, and the focus shifts to recovery. This decision
may be taken in consultation with multi agency partners. The recovery process from a Black
Start may be challenging and long-term, and priority will continue to be given to those most
in need throughout this recovery process. The recovery phase from a Black Start event is
also included as a specific item within Business Continuity Plans for all Service areas. 
Page 77 of 118

Page 78

Page 78 of 118

Page 79

North Lanarkshire Council
Report
Communities Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref   SP/LP/SMcL  Date 30/10/23 
Access to Free Period Products (Period Dignity Initiative) update 
From:  Stephen Penman, Chief Officer (Communication and Engagement) 
E-mail penmanste@northlan.gov.uk
pollockle@northlan.gov.uk  Telephone 07947 997750 
Executive Summary
This report provides an update on the activity relating to the delivery and further
development of the Access to Free Period Product / Period Dignity initiative. 
Members will be aware that since August 2018 all local authorities in Scotland were
provided with funding to introduce access to free period products in schools. 
From January 2019 the Scottish Government provided additional funding to all local
authorities to increase the number and range of places where period products are available
free of charge to those who need them, with a focus on publicly accessible buildings. 
The purpose of the funding for schools remains to support equality, dignity and rights for
those who menstruate and to ensure that lack of access to products does not impact on an
individual’s ability to fully participate in education, at all levels. 
The main intent of the wider roll out for community provision remains tackling poverty but
also wider need and to address the overarching gender equality and dignity issues that
affect all of those who menstruate regardless of income. Currently, spending is split
between school and community provision. This approach has been designed to reflect the
needs of communities across the council area. 
The Period Products (Free Provision) (Scotland) Act 2021 received Royal Assent on 12th
January 2021, became legislation on the 15th of August 2022 and fully into force in January
2023. 
This important work will continue to be informed by the findings from online consultation
with residents. 
Recommendations
It is recommended that the Communities Committee: 
(1)  Acknowledge the significant work carried out to date across key council services and 
partner agencies. 
(2)  Approve the outline of the planned developments for the next two-year period, this is 
dependent of additional Scottish Government funding for the year 24/25. 
Item 6
Page 79 of 118

Page 80

1. Background 
1.1 From August 2018, all local authorities in Scotland were allocated funding to provide
access to free sanitary products in schools. The Scottish Government made a new
commitment in the 2018 funding year to expand this provision beyond schools. In
November 2018 COSLA Leaders agreed to this proposal and developed ‘Guiding
Principles’ in partnership with Scottish Government. Since then, North Lanarkshire
Council has been allocated a share of funding annually to further develop the initiative. 
1.2 The focus for this initiative is creating access to free period products, and by doing so
tackling the impact of poverty or low income, which can often mean people are unable
to afford the essential products needed while menstruating. 
By ensuring access to free products, many local people have some relief from the
high costs of purchasing period products and will be less self-conscious about not
being able to afford them and the stigma attached to this. 
1.3       Annual funding from the Scottish Government has enabled the council to continue to            
develop the network of public building access points, to work with local community   
partners to target support across priority communities and to develop a campaign to            
raise awareness of the offer available and encourage a more open dialogue around 
periods and period products. 
1.4     The council has undertaken a community consultation to find out residents’ views on
the current offer, improvement ideas, and early experiences of the initiative. The              
findings from the consultation, along with feedback from other stakeholders, will be 
used to lead the ‘Statement of Intent’, which will confirm the council’s commitment            
to supporting the new law and the continued wider access to products. 
2. Report 
2.1 The main objective for this initiative is to create access points where residents can
access a range of free period products and in doing so support people experiencing
poverty issues. Consistent with the Plan for North Lanarkshire, the North Lanarkshire
model has been developed with community planning partners to ensure wide reach and
accessibility from public buildings and facilities, as well as distribution by local anchor
organisations. 
The approach reflects the principles of: - 
• Protecting people’s dignity, avoiding anxiety, embarrassment and stigma.
• Making a range of products visible in places that people use.
• Reflecting community views and needs. 
• An efficient and effective approach that demonstrates value for money.  
• Individuals being able to get sufficient products to meet their needs. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (20) Improve the involvement of communities in the decisions,
and development of services and supports, that affect them
Programme of Work All Programmes of Work 
Page 80 of 118

Page 81

• Gender equality ensuring anyone who menstruates can access products
including transgender men/nonbinary individuals and that language is gender
inclusive.
• Awareness raising and education to both promote the ‘offer’ and attempt to
change cultural norms. 
North Lanarkshire Council Funding Allocation (2018/19 – 2023/24) 
2.2 Table 1 
Financial Year Amount of Funding
2018-19  £81,112
2019-20 £187,155
2020-21 £359,000
2021-22 £359,000
2022-23 £336,000
2023-24 £336,000 
Key highlights from 2022/23 
2.3 The number of period products distributed from 1st April 2022 to 31st March 2023 
numbers of period products distributed via schools, public buildings or community 
anchor organisations is as follows: 
Single-use period products – (includes all single use sanitary products e.g., towels,
tampons, liners): North Lanarkshire Total – 686,592 
Number of Period Products distributed through public buildings or community 
anchor organisations – 320,744 
Number of Period Products distributed through schools – 78,396. 
Community Projects 
2.4    The council is currently working in partnership with eight anchor organisations to ensure
effective targeting of support to priority communities within their area and to support
individuals who are unable to attend local access points due to personal circumstances
including. 
• Mobility and health. 
• Being unable to afford the cost of public transport. 
• Distance from home to the nearest access point for example living further than 20-
minute return journey, which will be more likely for those living in rural communities. 
This is an increase from five organisations in 2021-22 to eight in 22/23 The anchor 
organisations, currently involved in the programme include: - 
1. Getting Better Together 
2. Newmains Community Trust 
3. Glenboig Development Trust 
4. Cornerstone House 
5. Kirkshaws Neighbourhood Trust 
6. Diamonds in the Community
7. Jerviston Community Centre – African Collaboration Group
8. Lanarkshire Community Food and Health Partnership
Page 81 of 118

Page 82

Additional information is contained within Appendix 1. 
Over and above delivering against the main objectives for the period dignity initiative,           
all the organisations involved are committed to taking a sustainable approach to the           
project delivery. 
Most of the projects have an environmental focus and are delivered by local volunteers
using bicycles and e-bikes to reduce the carbon footprint of the projects. Each
organisation also acts as a champion for the promotion of the use of sustainable
environmentally friendly products. 
Communication and awareness raising: 
2.5 We continue to raise awareness raising with dedicated marketing materials in a bid to
promote and raise awareness of the initiative to local residents. 
This involves the use of North Lanarkshire Council’s online and social media networks.
Other activities within the campaign include. 
• Posters and leaflets in all public buildings and facilities 
• Promotions at local events
• Period products pick up location QR code, highlighting all accessible venues across
North Lanarkshire 
Appendix 2 provides examples of some of the campaign materials. This marketing and
advertising has resulted in a greater awareness of free period products to the residents
of North Lanarkshire. 
NLC interactive map 
2.6     The NLC interactive map continues to be updated on a weekly basis making sure it is
fully to date to allow residents access the latest comprehensive list of local access
points. North Lanarkshire now has over 100 access points that ensures wide reach and
accessibility to the people of North Lanarkshire. interactive map 
Support to local foodbanks 
2.7 As an extra level of support, period products are provided to North Lanarkshire 
foodbanks and food aid charities, so that they could be offered to service users who
were dealing with increased financial pressures. 
Lanarkshire Community Food and Health Partnership are the main agents for food- aid
organisations to ensure a consistent and coordinated approach. Utilising their company
vehicles and extensive networks they are able to ensure supplies were delivered to
local food banks who then distributed products to anyone who required them. 
Partnership Working 
2.8 Partnership working continues to be an important factor throughout this initiative.
Liaising with community facilities, library service, Active and Creative Communities,
Voluntary Action North Lanarkshire, NHS Lanarkshire, and local community delivery
partners coordinated approach has been established to the development and delivery
of the initiative and ordering processes. 
Page 82 of 118

Page 83

Greater links have also been established with early years nurseries and family Learning
centres to promote awareness of the offer. 
Some of the highlights of the partnership working has been securing a central store,
stock management and distribution service with Dunlin Court, Unit 10, Strathclyde
Business Park and Aquatec sport centre.  
The opening of new access points along with 2 vending machines in both accident and
emergency units within University Hospital Wishaw and University Hospital Monklands. 
We continue to have twice-yearly partnership meetings and professional dialogue  has
taken place that has assisted in helping to monitor and review activity and identifying
and considering options to improve and develop the service whilst  providing updates
on any of the project delivery that individual agencies may be leading on. 
Statement of Exercise of Functions 
2.9 As part of The Period Products (Free Provision) (Scotland) Act 2021 local authorities
are required to produce and communicate a Statement on the Exercise of Functions to
summarise the arrangements in place to meet the legal duties, which includes carrying
out one or more public consultations. 
The information gained from the public consultation work carried out in March to July
2022 has been used to create the North Lanarkshire Council Statement of Exercise of
Functions. The statement is contained within Appendix 3 and sets out North
Lanarkshire Council’s commitment to free product provision details current and future
provision in education establishments and the wider community. 
Public Consultation 
2.10 The North Lanarkshire public consultation took the form of an online questionnaire. This
was launched in March 2022 and ran until the end of July 2022. The survey was
designed to capture the views of the general public with a particular focus on views
from those currently using sanitary products, those who will use sanitary products in
the future and those who may collect sanitary products on behalf of others. 
2.11 The consultation covered the following broad themes: 
• General awareness of the availability of free period products and advertising
campaigns.
• Types of products currently used and views on accessing environmentally friendly
products. 
• Locations of access points used and suggestions for new sites.
• Availability of products and views on service received at access points.   
2.12 The survey was completed by 288 people and can be viewed in Appendix 4. 
Response statistics 
2.13 The survey was completed by people from all community board areas. The specific
breakdowns are provided in Table 2 below.  (Note: 3 people skipped this question).  
Page 83 of 118

Page 84

Table 2: Response statistics per Community Board 
Community Board Number of returns % share of returns
Airdrie 56 19.65
Bellshill 24 8.42
Coatbridge 55 19.30
Cumbernauld 37 12.98
Kilsyth 6 2.11
Motherwell 49 17.19
Northern Corridor 16 5.61
Shotts 16 5.61
Wishaw 25 8.77
Total 285 100 
2.14 Table 3 below, provides the level of responses per age group. With the highest level of
responses coming from 40–49-year-olds with 91 responses. 
Table 3: Number of responses by age group 
Age group Number of returns %
Under 16 23 7.99
16-20 24 8.33
21-29 43 14.93
30-39 70 24.31
40-49 91 31.60
50 and over 28 9.72
Prefer not to say 9 
Total 2 100 
Key findings from consultation 
2.15 The most popular place for people to access products were leisure centres (22.82%)
and community centres (20.75%). Moving forward it will be important to better track the
locations being used for collection of products. Currently the only way to monitor this
is via stock control. 
2.16 The highest volume of products accessed were press on regular towels with wings
(42.81%) followed by press-on super towels with wings (29.82%) The lowest number
of products accessed were tampon super without applicator. The percentage of
environmentally friendly or lifestyle products requested was 7.02%. 
Environmentally friendly and lifestyle products can only currently be accessed by
submitting an enquiry. Products are then supplied by a local community partner anchor
organisation or directly from the council’s approved supplier (Hey Girls). 
2.17 It’s clear that, in the main, current access points are working effectively however, the
proportion of residents who had to ask for products at sites remains high at 44.13%.
While this is not necessarily an issue for some residents, the proportion who then chose
to leave without asking remains high, with 53 respondents indicating that they decide
not to ask for free products. This is an area highlighted for improvement.
Page 84 of 118

Page 85

2.18 A high number of respondents indicated that there have been occasions when
visiting access points that products were not available. This is another area for
improvement. 
2.19 Respondents have provided views on where free products could be accessed. This
included doctors, local shops, community facilities, council buildings, foodbanks and
other suggestions such as supermarkets. 
While the main focus for wider community access is public buildings, the feedback
provided enables consideration and testing of the use options, especially in priority
communities with high levels of deprivation and/or no access point. 
2.20 Feedback from the survey indicates that more than a third of respondents were aware
of the 2021/22 campaign, with the highest responses reported for the poster
advertising in public buildings, followed by adverts on websites and social media
platforms. 
2.21 A high level of respondents (88.43%) indicated that the period dignity initiative and
campaign has helped talking about periods and period products easier and more
acceptable. This is a good indicator that, over time, stigma around menstruation and
accessing free products can be reduced. 
2.22 The consultation has identified that there is interest in finding out more about
environmentally friendly period products (51.64%) This is significantly higher than the
current level of requests being received. Options will be considered to build on this
interest. 
Developments being planned for 2023/24 - 2024/25 period. 
2.23 Using intelligence from our previous consultation work as well as other feedback from
partners and stakeholders, several key developments are currently underway.
Completion of which will assist with a further targeted expansion and the
implementation of improvements aimed to improve processes, service deliver and the
overall offer for residents: - 
1. Completion of gap analysis and mapping to identify new access sites. The principle
of a 20-minute neighbourhood is being used for this, with the aim to have access
points within a short walk or cycle lasting no longer that 20 minutes for the return
journey. 
2. Review of existing access points to reduce clustering. Work is underway with NHS
Lanarkshire to ensure health centre / clinic sites do not duplicate where there are
access points available in nearby public buildings. The better used site, with longer
opening hours will be preferred. However, where there is a demonstrated need for
multiple sites within an area, then this will be retained. 
3. Recruitment of additional anchor organisations for areas where a third sector
delivery partner would be beneficial will focus on priorities communities within
Bellshill, and Kilsyth. 
4. Plan and deliver a peer-led youth project to deliver period dignity workshops and
information sessions in local youth groups and projects. 
5. Launch of a new campaign focusing on general awareness raising, promotion of
environmentally friendly products and the interactive mapping tool.
Page 85 of 118

Page 86

6. Improved data collection and analysis to better inform future developments and
improvements. This will include improving the data on the locations being used for
accessing free products. 
7. Further community engagement on the use of environmentally friendly period
products. 
8. Consider options to improve the accessibility of products over weekends, public
holidays, and extended holiday period when schools and public building may be
closed. 
9. Review the set-up of access points to ensure products can be easily accessed
preferably by self-selection or other formats that are viewed as less embarrassing
for residents, for example by using a discrete card to request products. 
10. Produce a short training module and guidance note for staff and volunteers involved
in running collection points, specifically ensuring products are regularly replenished
and at ways to reduce stigma associated with requesting and collecting products. 
11. Develop a community resilience / contingency plan to deal with any event of future
civil incident or national emergency. 
Further information 
2.24 Additional information, including the information pages on the NLC website, the NLC
interactive mapping tool and the My Period App can be accessed using the links
below: 
North Lanarkshire interactive map 
North Lanarkshire Council website – Free Period Products 
Scottish Government ‘Pick up my period’ app enables someone to put in a town, city
or post code and find out where to access products
https://apps.apple.com/gb/app/pickupmyperiod/id1500403938
https://play.google.com/store/apps/details?id=com.myperiodapp 
3. Measure of success 
3.1 Number of products distributed.
3.2 Number of individuals accessing free products.
3.3 Number of community organisations partnerships.
3.4  Number of distribution points across North Lanarkshire.
3.5 Number of environmentally friendly products accessed. 
Page 86 of 118

Page 87

4. Supporting documentation 
Appendix 1: Details of community anchor organisations supporting the initiative.
Appendix 2: Example campaign materials
Appendix 3: Statement of Exercise of Function
Appendix 4: Public consultation - survey 
Appendix 5: Full consultation responses 
Stephen Penman
Chief Officer (Strategic Communication and Engagement)
Page 87 of 118

Page 88

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Fairer Scotland duty will be considered on an ongoing basis as part of the
development and implementation of the North Lanarkshire approach to the
provision of free period products. 
An integrated equality impact / Fairer Scotland assessment has been completed
during the initial planning of the delivery approach. This will be further informed by
our ongoing monitoring, reviews and public consultations and community
engagement activity. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments   
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The period dignity / access to free period products is expected to cost the council
circa £320,000 to operate. This is for both existing operations and new
developments. However, funding for the initiative is provided through an additional
grant from the Scottish Government.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact.
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? Page 88 of 118

Page 89

Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Wider use of environmentally friendly products and delivery products is
encouraged. This includes looking at testing approaches to increasing access to
environmentally friendly products and piloting low carbon delivery mechanisms with
local voluntary organisations.
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
A communication campaign is outlined in this report
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒
Page 89 of 118

Page 90

If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 90 of 118

Page 91

Details of Community Anchor Organisations Supporting the Initiative                                  Appendix 1 
Community Projects Location Description 
Glenboig Development Trust 
Period Dignity Project 
Glenboig The programme aims to promote access to period products, promote
environmentally friendly period products and ensure dignity to
menstruating persons living in Glenboig and surrounding areas whilst
respectful of our carbon footprint and the local environment. 
Improving on last year they added another electric vehicle to their fleet an
E-Moped which allows for distribution to a further reach within the
community compared to E-Cycles. Worked in tandem with partner
agencies and use of social media to spread awareness of the Period
Dignity Campaign. Training of 3 volunteers to support the campaign with
continued focus on dignity putting in place various methods to procure
products from discreet on site pick up to delivery through request from
various sources such as email, text and social media. 
Kirkshaws Neighbourhood Trust 
NLC Period Dignity Project 
(Coatbridge) 
Coatbridge  Products provided by North Lanarkshire Council will be distributed freely
and delivered to local women, girls, groups and organisations by
Kirkshaws Neighbourhood Centre on Electric Bike (to reduce carbon and
supporting North Lanarkshire Council to achieve #Act2021). We will
encourage women and girls to consider the more sustainable
environmental products such as Hey Girls environmentally friendly
products by providing information and opportunities for them to try these
products, which for many would be unaffordable. 
Having purchased E-Bikes this has seen the project be environmentally
friendly, along with the training of more volunteers there has been more
awareness spread for the campaign and helping to reduce stigma around
period health as a talking point. Continual strengthening of links with other
organisations is helping in delivery of information and sanitary products. 
Page 91 of 118

Page 92

Newmains Community Trust 
Flo & Go Dignity in Menstruation Project 
Newmains Newmains Community Trust will undertake a Period Product Delivery
Scheme within Newmains and Surrounding Areas. The scheme will
involve a team of trained volunteers taking orders and delivering re-usable
and environmentally friendly Period Products to those who need it in the
community. It is the aim of this project to ensure that access to Period
Products does not become another source of deprivation to those living in
Newmains and that anyone who needs them, can access them in person
or through the delivery scheme.
Improving on last year the volunteers have been successful in delivering
sanitary products to the community with hopes on expanding the reach
across Newmains further. There is a focus on delivering more reusable
products as they are in demand in the area, this will have a positive impact
on the environment, coupled with the use of E-Bikes. Further promotion of
the campaign has also been achieved through various events and working
in tandem with partner agencies. 
Getting Better Together - Healthy Living
Centre 
The Cycle 
Shotts Develop a delivery service by training staff and volunteers to use Electric
Bikes to transport orders of Hey Girls environmentally friendly and lifestyle
products to people in rural communities. This links in with the council
commitment to ACT2021- Action on Climate Together 2021. 
Following the successful implementation of E-Bikes as well as an E-Van a
delivery system has been established in the area. This helps get sanitary
products out to households within the remote regions near Shotts as well
as those who have trouble accessing drop off points. Increased work to
promote the period dignity project as well as how to access the delivery
service, along with an increase in attendance of events to further
collaborative work and promotion. Aims to increase the reach and scale of
those delivered to within the community in the future upon what is already
established maintaining healthy growth.  
Cornerstone House Centre 
Period Products Project 
Cumbernauld Promotion of the ‘pickup point’ using Cornerstone House Centre’s
marketing materials and social platforms, website and in-house
information points. Cornerstone House Centre will raise awareness of the
‘app’ ‘Pickup My Period’ which allows users to identify locations across
Scotland where Free Period Products will be available. Developed by Hey
Girls and funded by the Scottish Government through their education arm
Page 92 of 118

Page 93

‘My Period’. Hey Girls products are all sustainably sourced, reusable and
plastic free. Inform local partners and key organisations of the service
being provided at Cornerstone House Centre within the Health &
Wellbeing focus already in place. 
Ensure ‘anyone who needs them’ has access to different types of Period
Products ‘reasonably easily’ and with ‘reasonably dignity’. Provide
environmentally suitable products provided by an authorised provider.
Support other areas, identified if relevant by users of the service as
financial or other issues may need support/help.
Lanarkshire Community Food and Health
Partnership 
NLC Period Dignity Project 
Coatbridge
(Bargeddie) 
Proposal to help provide all participants in our food classes - for
themselves and their suitable family members – with free sanitary
products.   We also aim to supply all eligible community members who
receive food parcels with the necessary sanitary products of their need. 
LCFHP also provide various foodbanks or community groups with a
supply of sanitary products as and when they require.   
Jerviston Community Centre – African
Collaborative Group 
Period Dignity Project 
Motherwell The African Collaborative group helped to operate a food bank in the
Motherwell region, now looking to expand providing free sanitary products
across the region as well. With aims of procuring E-Bikes and establishing
a delivery service for those who can’t attend the access point due to
disability and other issues faced. Including a delivery service and acting as
a pick up point there will be a focus on building further relationships within
the community to break down stigma around period discussion and
continued work to promote the service/project. 
Diamonds in the Community 
Period Dignity Project 22/23 
Airdrie  Diamonds in the Community proposed to become an anchor organisation
helping to support the period dignity campaign within the Airdrie region.
Aims of the organisation are to promote and support NLC’s delivery of the
period dignity campaign, promotion of the pick up My Period App,
promotion of the campaign. Collaborative efforts within the community to
raise awareness and combat stigma around periods and period health
promoting healthy discussion and inclusion. Collection of data and feeding
back key elements to NLC. 
Page 93 of 118

Page 94

Appendix 2 
Example Campaign Materials 
• Billboard Adverts/Rear Bus Adverts/Railway Station Adverts/Plasma Screen Adverts/Pull up Banners/Posters/Flyers 
Page 94 of 118

Page 95

Page 95 of 118

Page 96

Holytown Gala Day Event 2023 
The Holytown Gala Day event was an excellent
venue to attend to spread the awareness surrounding
the Period Dignity Campaign. As seen in the image
provided there was a pop-up banner display created
that established the goal of making members of the
public aware of free period products in their area. It
served as a good platform to have discussions with
members of the community, spread awareness,
discuss the products we have to offer both single and
reusable. We were also able to have a positive impact
in diverting people to make use of the NLC Directory
Map showcasing all our pickup points across the NLC
Vicinity. Not only that but we have had positive
engagement with community members since this took
place with many querying for more information.
Showing a great uptake in community interest. 
Page 96 of 118

Page 97

QR Code   
Going forward we are looking to make the following
QR code uniform across all our promotional material
as it directly leads to the North Lanarkshire Council’s
website in particular the NLC Directory Map. This is
where members of the public can access a map that
lists all the period pick up points across the NLC
Region. It is easily accessible for all those who have a
smartphone as it can quickly be scanned through
their camera and have them on the website in a
matter of seconds providing valuable information to
those who need it. 
Page 97 of 118

Page 98

Appendix 3 
North Lanarkshire Council
Period Products (Free Provision) Scotland Act 2021
Statement on Exercise of Functions
1. Introduction 
The Period Products (Free Provision) (Scotland) Act 2021 was passed by the Scottish Parliament on 24th
November 2020 and gained royal assent on 12th January 2021. The Act requires local authorities as a
responsible body to provide period products free of charge to anyone who needs them, by making products
reasonably easy to obtain.
Additionally, as a responsible body – this should be done mindful of respecting dignity and by offering a
reasonable choice of types of period products.
Local Authorities are required to produce a Statement on Exercise of Functions to summarise the arrangements
that will be put in place to meet the duty, which includes carrying out one or more public consultations.
This statement has been produced in accordance with our statutory duties and outlines North Lanarkshire
Council’s commitment to free product provision and details current and future provision within education
establishments and the wider community.
2. Our commitment 
North Lanarkshire Council is committed to providing free period products for those who need them. Our approach
involves children and young people having access to products within their school setting and for residents and
visitors through a network of local access points within public buildings and community facilities within North
Lanarkshire.
Individuals unable to attend a local access point can contact the council so that alternative arrangements can
made, which may include postal deliver or deliver by our local community partner organisations. Funding has
been made available by the Scottish government to enable this.
In providing this free service, it is our aim to ensure that:
• A range of period products, including single use items and re-usable environmentally friendly products are
available to those who need them via all secondary schools and a network of local access points. 
• Our local access network is kept under review and developed further where appropriate. It is our commitment
to do this in conjunction with community planning partners and third sector organisations, mindful of
geographically gaps in provision and also of the 20-minute neighbourhood model. 
• Barriers to access are minimised and removed and that people can access products with dignity and
without stigma. 
• Consideration is given to additional support for those who may require it. 
• Product demand is regularly monitored so that public buildings and community facilities do not run out of
stock.  Page 98 of 118

Page 99

• Residents and visitors are aware of our free provision. This will involve a range of advertising and promotional
campaigns. Information will also be available on the council website; through social media platforms and
through other communications such as posters and informational flyers. 
• Regular feedback is sought from service users so that improvements can be identified. 
• Public consultations and community engagement is carried out to inform our provision 
3.   Public Consultation 
The North Lanarkshire public consultation took the form of an online questionnaire. This was      
launched in March 2022 and ran until the end of July 2022.      
The survey was designed to capture the views of the general public with a particular focus on      
views from those currently using sanitary products; those who will use sanitary products in the      
future and those who may collect sanitary products on behalf of others.      
The consultation covered the following broad themes:
• General awareness of the availability of free period products and advertising campaigns
• Types of products currently used and views on accessing environmentally friendly products
• Locations of access points used and suggestions for new sites
• Availability of products and views on service received at access points 
The survey was completed by 288 people and the findings from the consultation will be used to inform      
the provision within North Lanarkshire.      
Full details of the findings are contained within the 2022 update report which can be accessed on our      
website.
4. Community Based Provision 
North Lanarkshire Council has developed a large network of community access points. The access points
are in all 9 towns and many local communities within public buildings, and community facilities. To date we
have over 100 local access points throughout North Lanarkshire which we will continue to monitor, review,
grow and update accordingly. The access points have been established in public buildings and community
facilities.
North Lanarkshire Council have also partnered with eight local community anchor organisations who will
provide local services within a cluster of priority communities.
This also includes a fast free local delivery service for those who cannot attend our centres and access to
environmentally friendly period products.
Local food banks and organisations providing emergency food aid are also part of our network and on
request can provide products to vulnerable individuals and families.
Additionally, residents can contact the council directly by email to request products. In doing so the
quickest method of delivery will be selected.
Products available within our community access points include single use pads (with and without wings,
regular, super and long) and tampons (regular and super) the various sizes/ absorbencies provided allow us
to accommodate individual needs and preferences. The type of products available will be regularly reviewed
to meet the needs and wants of the community. Environmentally friendly products are available on request.
Page 99 of 118

Page 100

Products are available for collection by anyone who needs them, or by anyone collecting on behalf of another
person. Products will normally be available within toilet facilities of a building, unless otherwise stated. Those
who wish to access products can do so without having to ask a member of staff and in a way that respects
their dignity. A person may access as many products as required.
Information on stocked venues can be accessed via the PickUpMyPeriod App and North Lanarkshire Council
Directory website. This allows users to enter a postcode or location to see where free period products are
available in their area.
5. Provision within Education 
North Lanarkshire Council provide free products in all secondary school establishments and on request will be
made available to primary schools.
Products will be available in a way which respects the dignity of the pupil and can be accessed without having
to ask a teacher.
Products will be available during term time in at least one part of the school, normally the toilet facilities or from
the school reception. Some schools may have products available in multiple locations.
North Lanarkshire Council will provide ongoing support to its education establishments to ensure every pupil
who requires products is able to obtain them easily.
6. Communication 
Information on our free period product initiative is available on the North Lanarkshire Council website. Details
are provided on how, where and when people can obtain free products via our own easy to use app and the
official Period Products Locator app.
Enquiries can also be submitted at any time and will be dealt with by our Community Partnership Team.
It is our intention to regularly promote and raise awareness of the free access to period products. This will
involve advertising and marketing campaigns using digital and traditional methods. Information posters are
also posted on notice and information boards in all our public buildings and community facilities.
7. Future Provision and Improvements 
North Lanarkshire Council recognises the importance of securing period dignity for all and will commit to using
intelligence from our consultation work as well as other feedback from partners and stakeholders, to continue to
develop our approach to providing free period products within North Lanarkshire.
From our recent consultation and engagement work a number of key developments are currently underway.
Completion of which will assist with a further targeted expansion and the implementation of improvements aimed
to improve processes, service deliver and the overall offer for residents and visitors. Further details are provided
within the 2022 update report which can be accessed on our website. 
8. Further information 
Additional information can be found on the NLC website free period products
(northlanarkshire.gov.uk)
The NLC interactive mapping tool can be accessed using the following link: Directory records | North
Lanarkshire Council
Page 100 of 118

Page 101

Scottish Government ‘Pick up my period’ app enables individuals to put in a town, city or post code and find
out where to access products. 
PickupMyPeriod on the App Store (apple.com)
PickupMyPeriod - Apps on Google Play
Index - MyPeriod (myperiodlive.azurewebsites.net 
Page 101 of 118

Page 102

Appendix 4 
Access to Free Period Products in North Lanarkshire 
North Lanarkshire Council has been providing free period products since 2019. We provide free
period products to anyone who needs them. 
We want to know if you find it easy to access the products and your ideas on how we could make
them even easier to access. 
Please spare a minute to complete the survey below to help us plan for the future: 
1. What area do you live in? 
Airdrie Cumbernauld
Bellshill Kilsyth
Coatbridge Northern Corridor (Moodiesburn, Stepps,
Motherwell
Gartcosh, Chryston, Glenboig, Muirhead, Mount
Ellen, Mollisburn, Auchinloch, Cardowan) 
Wishaw Shotts   
2. What is your age band? 
Under 16 40-49
16-20 50 and over
21-29 Prefer not to say
30-39   
3. Where do you access period products from? (Tick all that apply) 
Library Churches
Leisure Centre Community Cafes
Community Centre Food Bank
School/ Nursery Other  
Please give the name of the building you access period products from most often. 
Page 102 of 118

Page 103

4. What product do you use the most? 
Press on towel-regular with wings  
Press on towel-regular without wings  
Press on towel-super with wings  
Press on towel-super without wings  
Tampon-regular with applicator  
Tampon-regular without applicator  
Tampon-super with applicator  
Tampon-super without applicator  
Environmentally friendly or lifestyle products  
Other (please specify)   
5. When accessing products did you have to ask or were they readily available? 
Had to ask 
Readily available 
6. Based on your experience how comfortable did you feel when trying to access products 
Comfortable 
Okay 
Uncomfortable 
Decided not to ask for products 
Other (please specify)   
7. Has there been a time when the free period products were not available? 
Yes     No 
If Yes, When and Where?   
8. Do you prefer to take a full pack of period products home or use what you need at the time? 
I prefer to take a pack home                      I have no preference 
I prefer to use them in the building
Page 103 of 118

Page 104

9. Where do you think you should be able to access free period products? (select all that apply) 
Council buildings  
Community facilities  
Local shops  
Foodbanks  
Online ordering service  
Doctors  
Other (please specify)   
10. Have you tried our new interactive map on the council website? If yes how helpful did you find it on a
scale of 1 - 5. 1 very easy to use 5 no use at all 
very easy to use useful okay not easy to use no use at all   
Other (please specify)   
11. Have you ever noticed any adverts for free period products in North Lanarkshire? If so, where did
you see the advert? (Tick all that apply). 
A poster in a Community Venue (such as Leisure Centre) 
Snapchat 
YouTube 
On another website/Google 
Poster on a bus 
On a billboard/other outdoor advertising 
On the Daily Record online 
12. Do you think that providing and promoting free period products helps to make talking about
periods and period products easier and more acceptable? 
Yes 
No
13. Are you interested in finding out about more environmentally friendly period products? 
Yes 
No 
If so, please contact the Community Partnership Team on communitymatters@northlan.gov.uk or visit our page on the Council
website. northlanarkshire.gov.uk/freeperiodproducts  Page 104 of 118

Page 105

Access to Free Period Products in North Lanarkshire 
Appendix 5 
Q1 What area do you live in? 
Answered: 285 Skipped: 3 
Airdrie 
Bellshill 
Coatbridge 
Motherwell 
Wishaw 
Cumbernauld 
Kilsyth 
Northern 
Corridor... 
Shotts 
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 
ANSWER CHOICES RESPONSES
Airdrie 19.65% 56     
Bellshill 8.42% 24     
Coatbridge 19.30% 55     
Motherwell 17.19% 49     
Wishaw 8.77% 25     
Cumbernauld 12.98% 37     
Kilsyth 2.11% 6     
Northern Corridor (Moodiesburn, Stepps, Gartcosh, Chryston, Glenboig, Muirhead, Mount Ellen, Mollisburn, Auchinloch, 5.61% 16  
Cardowan)     
Shotts 5.96% 17     
TOTAL  285   
Page 105 of 118

Page 106

Q2 What is your age band? 
Answered: 288 Skipped: 0   
Under 16 
16-20 
21-29 
30-39 
40-49 
50 and over 
Prefer not to 
say 
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%   
ANSWER CHOICES RESPONSES 
Under 16 7.99% 23     
16-20 8.33% 24     
21-29 14.93% 43     
30-39 24.31% 70     
40-49 31.60% 91     
50 and over 9.72% 28     
Prefer not to say 3.13% 9     
TOTAL  288   
Page 106 of 118

Page 107

Q3 Where do you access period products from?                  
(Tick all that apply) 
Answered: 241 Skipped: 47     
Library 
Leisure Centre 
Community 
Centre 
School/ Nursery 
Churches 
Community Cafes 
Food Bank 
Other 
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%   
ANSWER CHOICES RESPONSES 
Library 14.94% 36     
Leisure Centre 22.82% 55     
Community Centre 20.75% 50     
School/ Nursery 15.77% 38     
Churches 2.49% 6     
Community Cafes 7.05% 17     
Food Bank 5.81% 14     
Other 42.32% 102     
Total Respondents: 241   
Page 107 of 118

Page 108

Q4 What product do you use the most? 
Answered: 285 Skipped: 3   
Press on 
towel-regula... 
Press on 
towel-regula... 
Press on 
towel-super... 
Press on 
towel-super... 
Tampon-regular 
with applicator 
Tampon-regular 
without... 
Tampon-super 
with applicator 
Tampon-super 
without... 
Environmentally 
friendly or... 
Other (please 
specify) 
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 
ANSWER CHOICES RESPONSES 
Press on towel-regular with wings 42.81% 122     
Press on towel-regular without wings 14.39% 41     
Press on towel-super with wings 29.82% 85     
Press on towel-super without wings 7.37% 21     
Tampon-regular with applicator 20.35% 58     
Tampon-regular without applicator 4.56% 13     
Tampon-super with applicator 14.74% 42     
Tampon-super without applicator 3.86% 11     
Environmentally friendly or lifestyle products 7.02% 20     
Other (please specify) 6.32% 18     
Total Respondents: 285      Page 108 of 118

Page 109

Q5 When accessing products did you have to ask or were they
readily available? 
Answered: 247 Skipped: 41   
Had to ask 
Readily 
available 
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%   
ANSWER CHOICES                                                                          RESPONSES 
Had to ask                                                                                                   44.13%                                                109                                                  
Readily available                                                                                         55.78%                                       138  
TOTAL                                                     
Page 109 of 118

Page 110

Q6 Based on your experience how comfortable did you feel when
trying to access products 
Answered: 278 Skipped: 10   
Comfortable 
Okay 
Uncomfortable 
Decided not to 
ask for... 
Other (please 
specify) 
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%   
ANSWER CHOICES RESPONSES 
Comfortable 30.94% 86     
Okay 17.63% 49     
Uncomfortable 20.86% 58     
Decided not to ask for products 19.06% 53     
Other (please specify) 11.51% 32     
TOTAL  278   
Page 110 of 118

Page 111

Q7 Has there been a time when the free period products were
not available? 
Answered: 239 Skipped: 49   
Yes 
No 
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%   
ANSWER CHOICES 
Yes 
No 
TOTAL 
RESPONSES 
40.17% 96
59.83% 143 
239
Page 111 of 118

Page 112

Q8 Do you prefer to take a full pack of period products home or use
what you need at the time? 
Answered: 274 Skipped: 14   
I prefer to 
take a pack... 
I prefer to 
use them in ... 
I have no 
preference 
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%   
ANSWER CHOICES RESPONSES 
I prefer to take a pack home 56.93% 156     
I prefer to use them in the building 20.44% 56     
I have no preference 22.63% 62     
TOTAL  274   
Page 112 of 118

Page 113

Q9 Where do you think you should be able to access free period
products? (Select all that apply) 
Answered: 282 Skipped: 6   
Council 
buildings 
Community 
facilities 
Local shops 
Foodbanks 
Online 
ordering... 
Doctors 
Other (please 
specify) 
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%   
ANSWER CHOICES RESPONSES 
Council buildings 56.03% 158     
Community facilities 64.54% 182     
Local shops 66.31% 187     
Foodbanks 48.58% 137     
Online ordering service 77.66% 219     
Doctors 70.92% 200     
Other (please specify) 16.67% 47     
Total Respondents: 282     
Page 113 of 118

Page 114

Q10 Have you tried our new interactive map on the council website? If
yes how helpful did you find it on a scale of 1 - 5. 1 very easy to use 5
no use at all 
Answered: 186 Skipped: 102   
(no label) 
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 
very easy t…   useful  okay   not easy to …   
no use at all           
VERY EASY TO USEFUL OKAY NOT EASY TO  NO USE AT TOTAL WEIGHTED 
USE     USE   ALL    AVERAGE
(no 13.98% 13.98% 21.51%  7.53%  43.01%   
label) 26  26  40   14  80  186 3.52               
Page 114 of 118

Page 115

Q11 Have you ever noticed any adverts for free period products in
North Lanarkshire? If so, where did you see the advert? (Tick all that
apply). 
Answered: 103 Skipped: 185   
A poster in a 
Community Ve... 
Snapchat 
YouTube 
On another 
website/Google 
Poster on a bus 
On a 
billboard/ot... 
On the Daily 
Record online 
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%   
ANSWER CHOICES RESPONSES 
A poster in a Community Venue (such as Leisure Centre) 43.69% 45     
Snapchat 1.94% 2     
YouTube 8.74% 9     
On another website/Google 22.33% 23     
Poster on a bus 4.85% 5     
On a billboard/other outdoor advertising 12.62% 13     
On the Daily Record online 5.83% 6     
TOTAL  103   
Page 115 of 118

Page 116

Q12 Do you think that providing and promoting free period products helps
to make talking about periods and period products easier and more
acceptable? 
Answered: 216 Skipped: 72   
Yes 
No 
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 
ANSWER CHOICES                                                                                                                                  RESPONSES
Yes                                                                                                                                                             88.43%              191
No                                                                                                                                                               11.57%               25
Total                                                                                                                                                                                           216                                                                                                                     
Page 116 of 118

Page 117

Q13 Are you interested in finding out about more environmentally
friendly period products? 
Answered: 275 Skipped: 13   
Yes 
No 
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%   
ANSWER CHOICES 
Yes 
No 
TOTAL 
RESPONSES 
51.64% 142
48.36% 133 
275
Page 117 of 118

Page 118

Page 118 of 118