Agenda Document Pack - Communities Committee - 27/10/2025

North Lanarkshire Council · 27 October 2025
Back to Communities Committee — 27 October 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Clerk Name: Karen Swan
Clerk Telephone: 07919 730272
Clerk Email: committee@northlan.gov.uk
16 October 2025
Members of the
Communities Committee
Chief Executive’s Office
Rachel Blair
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk
Notice is given that a Meeting of the Communities Committee is to be held in the Council
Chamber, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on Monday, 27 October
2025 at 10:00 AM which you are requested to attend.
The agenda of business is attached.
Rachel Blair
Chief Officer (Legal & Democratic)
Members :
G Woods, J Reddin, C Barclay, A Beveridge, G Brennan, B Burgess, A Bustard, J Cairns, K
Duffy, F Fotheringham, W Goldie, K Harmon, J Jones, J Keltie, J Leckie, M McBride, B
McCluskey, B McCulloch, P McDade, L Mitchell, L Nolan, N Shevlin, A Smith, J Toner, C
Williams.
Page 1 of 108

Page 2

Page 2 of 108

Page 3

Agenda
1 Declarations of Interest In Terms of the Ethical
Standards In Public Life Etc. (Scotland) Act 2000
2 Youth Engagement
Submit report by the Chief Officer (Strategy and
Engagement) providing an update on the consultation
and engagement carried out between August 2024 an
August 2025, by the Community Partnership Team,
with young people across North Lanarkshire.
5 - 24
3 Community Board Local Development Programme
Submit report by Chief Officer (Strategy and
Engagement) providing an update on progress with the
Community Board Local Development Programme
projects.
25 - 74
4 Community Boards and Partnership
Communications Strategy
Submit report by Chief Officer (Strategy and
Engagement) providing an update on key progress
linked to supporting the development of the Community
Boards model.
75 - 84
5 Community Asset Transfer Request from Rural
Rest - Land at Cecil Street, Coatbridge
Submit report by Chief Officer (Strategy and
Engagement) (copy to follow)
6 Active and Creative Communities – Update on
Performance
Submit report by Chief Officer (Community Operations)
providing an update on the performance of Active and
Creative Communities.
85 - 96
7 Active and Creative Communities and Community
Facility Usage and Footfall Q2 25-26 and Q2 24-25
Submit report by Chief Officer (Community Operations)
providing an overview of usage of a range of sports,
culture and leisure venues and our community
facilities, comparing quarter 2 of 2025-26 and quarter 2
of 2024-25.
97 - 108
Page 3 of 108

Page 4

Page 4 of 108

Page 5

North Lanarkshire Council
Report
Communities Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    SP/MC Date 27/10/25 
Youth Engagement 
From  Stephen Penman, Chief Officer (Strategy and Engagement)  
E-mail penmanste@northland.gov.uk 
costellom@northlan.gov.uk  Telephone 07725 289559 
1. Background 
1.1 Community Matters - A Framework for Working with Communities set out the
Community Planning Partnership’s commitment to engaging with communities
underpinned by a set of principles and approaches designed to deliver on key priorities
Executive Summary 
This report provides an up-date on consultation and engagement that the Community
Partnership Team has carried out with young people across North Lanarkshire between
August 2024 and August 2025 and the positive outcomes of this engagement.  This includes
consultation with young people around, 
• The development of Local Development Programme (LDP) Projects
• Local Outcome Improvement Plan (LOIP) priorities such as Youth Engagement and
Community Safety and
• Informing the development of the new Community Safety Strategy 2025-2030
• To raise awareness of Community Board processes 
Recommendations
It is recommended that the Communities Committee: 
(1) Recognises the breadth of youth engagement activity taking place by the Community
partnership Team and with the support of partners including Community Learning and
Development, Police Scotland, Scottish Fire and Rescue Service and NHS
Lanarkshire across North Lanarkshire and the positive outcomes of engagement that
has taken place.  
The Plan for North Lanarkshire
Priority  Enhance participation, capacity, and empowerment across our
communities
Ambition statement (20) Improve the involvement of communities in the decisions,
and development of services and supports, that affect them
Programme of Work All Programmes of Work
Item 2
Page 5 of 108

Page 6

associated with working with communities which included the creation of Community
Boards. The framework was approved by the Policy & Strategy Committee at its
meeting on 19 March 2020. 
1.2 As part of the commitment to engaging communities it is essential that engagement
and consultation takes place with young people across North Lanarkshire.  Face-to-
face consultation has been carried out with children and young people in relation to the
development of Local Development Programme (LDP) projects, LOIP priorities such as
Community Safety and Youth Engagement and to raise young people’s awareness
about Community Boards. 
2. Report 
Consultation with young people 
2.1 Consultation with young people throughout the reporting period was carried out in a
variety of ways, through face-to-face discussions, online consultation, through a youth
engagement event and a participatory budgeting project.  The Community Partnership
Team consulted and engaged with a total of 2,547 young people across North
Lanarkshire in the reporting period.  1,050 of these young people participated in 77
workshops around the development of Local Development Programme projects, LOIP
priorities and the new Community Safety Strategy, 207 participated in a Participatory
Budgeting Project, 1,110 young people participated in Design-a-sign competitions and
180 young people participated in partnership engagement events. 
Consultation around the development of Local Development Programme (LDP) Projects 
2.2 Young people within Primary and Secondary Schools are routinely consulted by the
Community Partnership Team around the development of Local Development
Programme (LDP) projects in their local areas such as playparks, Multi-Use Games
Areas (MUGA’s), and pump tracks. Young people’s views are taken into consideration
within project proposals and included in tender briefs to ensure that projects reflect the
needs of local young people.  The result of this is that young people are involved in the
development of facilities which are extremely well used in local communities. 
2.3 During the reporting period, 507 young people participated in 35 consultation sessions
to provide their views about the development of 20 Local Development Programme
projects across 7 Community Board areas.  Consultation with young people informed
the development of 13 playparks, 5 Multi-use Games Areas (MUGA’s), one village park,
one outdoor classroom, one Sidney Devine memorial project and the development and
design of Communication Boards with inclusive symbols for 40 play areas across North
Lanarkshire. All young people consulted were in favour of project developments and
welcomed the opportunity to participate in consultation. 
2.4 In addition to consultation around the development of Local Development Programme
(LDP) projects, engagement workshops were carried out in Wishaw/Shotts with 94
young people who attend St Aidan’s High School to raise awareness about the
Community Partnership Team and the Local Development Programme.  These
workshops raised young people’s awareness about budgets and processes and
provided young people with the opportunity to put forward ideas for potential future
projects. 
Page 6 of 108

Page 7

Design-a-sign Competitions 
2.5 Following the completion of projects, and where relevant, all children in local Primary
schools are encouraged to provide entries to Design-a-Sign competitions to name and
design signs for the new play facilities funded through the Local Development
Programme (LDP). During the reporting period, 1,110 children from 10 Primary Schools
participated in Design-a-Sign competitions.  Winners were chosen from each of the
schools that submitted entries to the competition with the winning design included on
the playpark signage. 
Consultation in relation to LOIP priorities 
2.6 Consultation and engagement have taken place with young people around Local
Outcome Improvement Priorities (LOIP) such as Youth Engagement and Consultation
and Community Safety. 
2.7 Youth Engagement and Consultation was specifically identified as a LOIP priority within
three Community Board areas, Cumbernauld, Kilsyth and Villages and the Northern
Corridor.  To address this priority, LOIP subgroups identified the need to engage and
consult with young people to find out what it’s like to be a young person living in their
Community Board or priority area, to identify young people’s needs and the issues that
are important to them.   
2.8 Consultation was carried out with young people through face-to-face sessions within a
variety of venues including schools, youth groups and through community
organisations and over the reporting period, 364 young people participated in 36 face-
to-face consultation sessions within Cumbernauld, Kilsyth and the Northern Corridor
Community Board areas. 
2.9 Joint Community Board and LOIP engagement Workshops were carried out with 16
young people in Wishaw/Shotts to consult with young people around the design of pop-
up boards and content to be created to promote Community Boards and LOIPs to
young people.  These sessions raised awareness of Community Boards and LOIPs
and enabled young people to participate in decision making processed, empowering
them to be more involved in community planning. 
2.10 Community Safety is an overarching theme and a specific LOIP priority within three
Community Board areas, Bellshill, Motherwell and Shotts.  There has been a range of
partnership engagement taking place across North Lanarkshire.  Youth engagement
that has taken place supported by Police Scotland and Scottish Fire and Rescue
Service across Community Board areas. For example, within the Bellshill Board area
Youth Engagement took place with young people through local schools and at Bellshill
pump track promoting young people’s involvement in diversionary activities to tackle
anti-social behaviour that was taking place. 
Consultation around the development of the new Community Safety Strategy 
2.11 Views of young people across North Lanarkshire were gathered in relation to
Community Safety through online consultation and targeted workshops with young
people. The Community Safety Strategy Survey was also circulated to organisations
working with/supporting young people across North Lanarkshire to ensure that young
people’s voices were heard which helped inform the development of the new
Community Safety Strategy 2025-2030 launched at the end of March 2025.   
Page 7 of 108

Page 8

2.12 A total of 410 young people were consulted in relation to Community Safety.  46 young
people responded to consultation around the development of the new Community
Safety Strategy including 26 young people who participated in 3 groups at Greenfaulds
High school and 10 young people from Youth Action Cumbernauld and 10 young
people also responding to the online Community Safety Strategy consultation. 
2.13 A further 364 young people were consulted and provided their views in relation to
Community Safety issues within their own communities as part of wider Youth
Engagement Consultation carried out across Cumbernauld, Kilsyth and the Northern
Corridor Community Board areas.  Consultation included questions aimed to gather
young people’s views about safety in their local community which informed the
Community Safety Strategy and assisted in informing Community Planning Partners
about Community Safety issues that were important to young people.  This enabled
partners to work together and target resources to where they are needed most. 
2.14 Engagement also took place across 11 schools to gather young people’s views about
their experience of accessing free period products and to improve access to projects
moving forward.  A range of outcomes were achieved through this consultation
including the implementation of a social media campaign targeted towards young
people, themed posters designed for schools and further promotion of My Period App. 
Outcomes of consultation 
2.15 Consultation and engagement carried out with young people has resulted in a range of
positive outcomes.  For example, young people’s voices were heard and helped inform
the development of the new Community Safety Strategy with young people identifying
community safety and other local issues that were important to young people. 
2.16 Young people who participated in youth engagement consultation welcomed the
opportunity to provide their views as they stated that they had not previously been
involved in any local consultation about their communities across their Board areas.
This consultation helped identify potential Local Development Programme (LDP)
projects for example young people in Cumbernauld identified a need for a facility such
as a pump track or playpark for older young people in Carbrain and this is being
investigated as a potential project development. 
2.17 Community Planning Partners (CPPs) involved in LOIP Youth Engagement Subgroups,
agreed further actions to address issues identified by young people through
consultation.  For example, Kilsyth and Villages Youth Engagement subgroup planned
and delivered two very successful partnership engagement events targeting young
people from Kilsyth and Villages that were held at Kilsyth Academy and St Maurice’s
High Schools engaging with approx.180 young people.  This was an excellent example
of CPP’s with the support of the Community Alcohol Partnership and local Community
organisations working together to engage and build positive working relationships with
young people.  Each organisation contributed staffing and provided interactive activities
at the events in response to issues identified by young people. Some issues identified
included unsafe practices near water, drugs, alcohol and vaping. Cumbernauld Youth
Engagement Subgroup recently met to review the consultation feedback and have
agreed actions and are planning targeted partnership interventions towards the
Carbrain area in Cumbernauld which was identified by young people as being the area
most in need of resource. 
2.18 Reports on findings from Youth Engagement Consultation have been prepared and
shared with Community Boards in Cumbernauld and Kilsyth and Villages and a report
to inform the Boards about issues that are important to young people.   Findings from
Page 8 of 108

Page 9

consultation with young people in the Northern Corridor will be submitted to a future
Northern Corridor Board Meeting. 
2.19 Young people reported a high level of satisfaction with the participatory budgeting
project, processes and project delivery.  Young people were provided with the
opportunity to put forward ideas for projects and participate in voting and in so doing
influence decision-making processes.  Young people’s involvement in deciding how the
specified budget would be spent was much more meaningful to young people and the
successful theme of Mental Health helped support young people’s Mental Health and
wellbeing. 
2.20 Consultation took place with 23 young people and staff in the Language and
Communication unit in St Aidan’s school and at Innerleithen Family Learning Centre
which informed the design and development of Communication Boards with symbols
that will be incorporated into 40 play areas across North Lanarkshire.  This consultation
was vital, involving young people in the development of the Boards resulted in positive
involvement and informative feedback being received from young people. 
2.21 Engagement with and involvement of 23 young people through Airdrie Action
Partnership’s planning and organisation of a Winter Warmer Event and Christmas
Appeal resulted in young people achieving Saltire Awards for volunteering and helped
them to work towards SQA qualifications. 
3. Measures of success 
3.1  Engagement and consultation with young people around the design and development
of Local Development Programme (LDP) projects, Local Outcome Improvement Plan
(LOIP) Priorities, participation in Participatory Budgeting processes and partnership
engagement events are all contributing to increased levels of engagement with young
people across North Lanarkshire resulting in positive impacts for local communities.   
3.2 Young people’s voices are being heard and are informing the design and development
of local projects and play facilities and informed the development of the new Community
Safety Strategy 2025-2030.  Young people are increasing knowledge and awareness
and are gaining opportunities to participate in decision making processes, empowering
young people to become more involved in Community Planning processes.   
4. Supporting documentation 
4.1 Appendix 1    Youth Engagement and Consultation with Young People - Summary
4.2 Appendix 2    Youth Engagement Case Studies 
Stephen Penman
Chief Officer (Strategy and Engagement) 
Page 9 of 108

Page 10

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 10 of 108

Page 11

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 11 of 108

Page 12

Appendix 1
Youth Engagement and Consultation
The Community Partnership Team carry out engagement with children and young people to gather
their views around the development of play areas and MUGA’s through the Local Development
Programme (LDP) across all Board areas in North Lanarkshire. The following is an outline of
engagement and consultation that has taken place with children and young people across North
Lanarkshire between August 2024 and August 2025.  
Kilsyth and Villages 
LDP Project  Purpose Venue Number of
children and
young people
consulted
Positive
outcomes of
consultation  
Project
status 
Rennie
Playpark
development
To gather young
people’s views
on playpark
development
Kilsyth
Academy/
Balmalloch
Primary
26
(2 groups)
Young People
feedback
contributed to
design
Tender
process
Bogside
Playpark
To gather young
people’s views
on Bogside Park
Upgrade
St Patrick’s
and Kilsyth
Primary
Schools
29
(2 groups)
Children’s
feedback
contributed to
design
Complete
Colzium Park
upgrade
To gather young
people’s views
on Playpark
upgrade 
Balmalloch
Primary
School
25 
(1 group)
Children’s
feedback
contributed to
design
Tender
process
Colzium Park
Upgrade
To gather young
people’s views
on Playpark
upgrade 
Banton
Primary
School
7 
(1 group)
Children’s
feedback
contributed to
design
Tender
Process
Hillside
Playpark
development
To gather young
people’s views
re design
Playpark 
Holy Cross
Primary
School
14 
(1 group)
Children’s
feedback
contributed to
design
Tender
Process 
Old Mill
View MUGA
development
To gather young
people’s views
on development
of Multi-Use
Games Area 
Holy Cross
Primary
School
11 
(1 group)
Children’s
feedback
contributed to
design
Tender
Process
Total Young people 112 (8 groups)
Page 12 of 108

Page 13

Cumbernauld 
LDP Project  Purpose Venue Numbers of
young
people who
attended
Positive
outcomes
of
consultation
Project
Status
Allanfauld
Road
Playpark
development
Engage with children
to gather their views
re new play area
St. Mary’s
Primary School
14
(1 group)
Children’s
feedback
contributed
to design
Tender
Process
Allanfauld
Road
Playpark
development
Engage with children
to gather their views
re new play area
Ravenswood
Primary School
14 
(1 group)
Children’s
feedback
contributed
to design
Tender
process
Total young people 28 (2 groups) 
Northern Corridor
LDP Project  Purpose Venue Numbers of
young
people who
attended
Positive
outcomes
of
consultation
Project
Status
Moodiesburn
Play area
Engage with young
people to gather
their views re
Playpark design
St Michael’s and
Glenmanor
Primary Schools
20
(2 groups)
Children’s
feedback
contributed
to design
Tender
assessed
contractor
appointed
Village Park,
Glenboig
Engage with young
people to gather
their views re
village park design
Glenboig
Primary
School/Glenboig
Development
Trust
35
(2 groups)
Children’s
feedback
contributed
to design
Progressing
Bluebell Park
outdoor
classroom
Engage with young
people to gather
their views re
outdoor classroom
Stepps and St
Joseph’s
Primary Schools
38
(2 groups)
Children’s
feedback
contributed
to design
Progressing
Frankfield
Road Muga,
Cardowan
Engage with young
people and
children to gather
their views re
Muga development
Our Lady’s High,
Chryston High,
Stepps and St
Joseph’s
Primary schools
56
(4 groups)
Children’s
feedback
contributed
to design
Complete
Lochside Play
area, upgrade
Gartcosh
Engage with
children to gather
their views re play
area
St Barbara’s and
Gartcosh
Primary schools
20
(2 groups)
Children’s
feedback
contributed
to design
Complete
Total young people 169 (12 groups) 
Page 13 of 108

Page 14

Coatbridge
LDP Project  Purpose Venue Numbers of
young
people who
attended
Positive
outcomes
of
consultation
Project Status
Queen’s Crescent
Play Area & MUGA
Engage young
people to
gather their
views on play
spaces in the
area
The Safety
Zone
68 (1 group) Young
people’s
voices were
heard and
their ideas
taken
forward to
create
modern
inclusive
recreation
areas.
Play area
contract in
award 
MUGA
tender in
progress 
Total young people 68 (1 group)   
Bellshill
LDP Project  Purpose Venue Numbers
of young
people
who
attended
Positive
outcomes of
consultation
Project
Status 
Clay
Crescent
Muga
development
Engage with
chilren to gather
views of re new
local facility
Noble and St
Gerard’s
Primary Schools
24
(2 groups)
Children’s
feedback
contributed to
design
Tender
Process
Holytown
Play area
upgrade
Engage with
children to gather
their views re
Playpark upgrade
Holytown
Primary
7
(1 group)
Children’s
views
contributed to
design
Tender
Process
Mossend
Play area
Engage with
children to gather
their views re
Playpark upgrade
Holy Family and
Mossend
Primary Schools
26
(2 groups)
Children’s
views
contributed to
design
Tender
Process
Total young people 57 (5 groups) 
Page 14 of 108

Page 15

Motherwell
LDP Project  Purpose Venue Numbers
of young
people
who
attended
Positive
outcomes of
consultation
Project
Status 
Fife Drive
Play Area,
Forgewood
upgrade
Engage with
children to gather
their views of
young people re
Playpark upgrade
Forgewood
Family Learning
Centre
4
(1 group)
Children’s
feedback
contributed to
design
Currently in
procurement
process. 
New Play
Area in
Jerviston
Engage with
children to gather
their views of re
new local play
facility
Our Lady & St.
Francis Primary
School
11
(1 group)
Children’s
feedback
contributed to
design
Currently in
procurement
process. 
Total young people 15 (2 groups) 
Wishaw
LDP Project 
Consultation
Purpose Venue Numbers
of young
people
who
attended
Positive outcomes
of consultation
Project
Status 
Sydney Devine
History Project
(linked to
Sydney Devine
memorial LDP
project) 
Engage with
children in
preparation for
the memorial
that will be next
to the school.
Cleland
Primary
School
18
(1 group)
Increased
awareness of 
CPT, LDP budget
and processes.
Ideas provided for
potential future
projects identified.
Best methods of
engagement with
young people
identified
In
progress
Newmains
MUGA 
Engage with
children to seek
their views re
new local MUGA
facility
Newmains &
St Brigid’s
Primary
Schools
17
(2
groups)
Children
participated in a
voting process and
learned about
democracy/decision
making around
community
planning and
contributed to
design decisions
and discussions
around the
maintenance/use of
MUGA.
In
progress
Page 15 of 108

Page 16

Communication
Boards
consultation
22nd August
2025
Consultation
with staff and
children on the
design of
communication
boards/symbols
for 40 play areas
across NLC.
Innerleithen
Family
Learning
Centre
20
(1 group)
Positive/informative
feedback gathered
from staff/children
informing
amendments to
draft boards.
In
progress
Communication
Boards
consultation
28th August
2025
Consultation
with staff and
children on the
design of
communication
boards/symbols
for 40 play areas
across NLC.
St. Aidan’s
LCSC
3
(1 group)
Positive/informative
feedback gathered
from staff/children
informing
amendments to
final boards.
Vital feedback
gained from target
group of children
and young people
with ASN.
In
Progress
Total young people 58 (5 groups) 
Wishaw/Shotts
LDP Project  Purpose Venue Numbers
of young
people
attended
Positive outcomes
CPT & LDP
workshops
To raise
awareness
about the
Community
Partnership
Team and Local
Development
Programme
St. Aidan’s
High School
94 Raised young people’s
awareness about the CPT and
LDP budget and processes. 
Young people identified
potential future projects
Total young people 94 
Design-a-sign competitions
The following are some examples of Design-a-sign competition’s that have been carried out
from August 2024 until August 2025.  
LDP – Design a
sign Competitions
Purpose Venue Numbers of
young people
who attended
Positive
outcomes of
consultation
Bogside Park Engage children
in a Design a Sign
competition for
upgraded play
area
St Patrick’s and
Kilsyth Primary
Schools
Approx 70 Children engaged
in the
competition. 
Winning design
and name used
on signage
Page 16 of 108

Page 17

Lochside playpark  Engage children
in a Design a Sign
and name the
park competition
Gartcosh and St
Barbara’s Primary
Schools
Approx. 260 Children engaged
in the
competition. 
Winning design
and name used
on signage
Dunalistair
playpark
Engage children
in a Design a Sign
and name the
park competition
Stepps and St.
Joseph’s Primary
Schools
Approx. 240 Children engaged
in the
competition. 
Winning design
and name used
on signage
Gartleahill Play
area Design a sign
Competition 
Engage children
in design
competition to
promote the new
play area
Tollbrae and St.
Edwards Primary
Schools
480 Children engaged
in the
competition. 
Winning design
and name used
on sign
Kirkwood Play
Area
Engage children
in a Design a Sign
competition for
play area
St Monica’s PS &
Old Monkland PS
Approx. 60 Play area sign
designed by local
young person,
good promotion
for LDP projects
Total young people 1,110 
LOIP Youth Engagement Consultation 
The following is a summary of consultation that has taken place with young people around the LOIP
Priorities across North Lanarkshire from August 2024 until August 2025.   
Kilsyth & Villages
LOIP Priority  Purpose Venue Numbers
of young
people
who
attended
Positive outcomes of
consultation
Youth
Engagement
Partnership Event
Engage with
young people
and respond to
issues identified
by young people
through previous
consultation
St Maurice’s High
School
Approx.
100 
Excellent partnership
engagement in
response to issues
identified by young
people through
consultation 
Total young people 100 
Page 17 of 108

Page 18

Cumbernauld
LOIP Priority  Purpose Venue Numbers
of young
people
who
attended
Positive outcomes of
consultation
Youth
Engagement and
Consultation
Consult with
young people
from Carbrain,
Kildrum and
Abronhill
Greenfaulds High
School
28
(3 groups)
Feedback reported to
Board and Youth
Engagement Subgroup
to inform key
partnership actions
moving forward.
Youth
Engagement and
Consultation
Consult with
young people
from Carbrain,
Kildrum and
Abronhill
Our Lady’s High
School
33
(3 groups)
Feedback reported to
Board and Youth
Engagement Subgroup
to inform key
partnership actions
moving forward.
Youth
Engagement and
Consultation
Consult with
young people
from Carbrain,
Kildrum and
Abronhill
Cumbernauld
Academy
23
(3 groups)
Feedback reported to
Board and Youth
Engagement Subgroup
to inform key
partnership actions
moving forward.
Total young people 84 (9 groups) 
Northern Corridor 
LOIP Priority  Purpose Venue Numbers of
young people
who attended
Positive outcomes of
consultation
Children & Young
People LOIP
priority 
Youth
consultation
Chryston
High School
53 (3 groups) 
S1-S3 pupils 
Several young people
accessed under-22
travel card
information.
Children & Young
People LOIP
priority 
Youth
consultation
Chryston
High School
28 (3 groups)
S4-S6 pupils 
Mental Health related
issues raised led to
joint PB project with
S3 year group (CPO &
Chryston HS) re
mental health related
issues (£10,000
funded via CPT UKSPF
allocation).
Children & Young
People LOIP
priority 
Youth
Consultation
St Maurice’s
High School
34 (3groups)
S1-S6 pupils 
Feedback highlighted
at Community Board
meetings and will
inform future actions.
Page 18 of 108

Page 19

Children & Young
People LOIP
priority 
Youth
Consultation
Our Lady’s
High School
46 (3 groups)
S1-S6 pupils 
Feedback highlighted
at Community Board
meetings and will
inform future actions
Children & Young
People LOIP
priority 
Youth
Consultation
Glenboig
Development
Trust
18 (1 group)
S1-S6 pupils
Feedback highlighted
at Community Board
meetings and will
inform future actions
Total young people 179 (13 groups) 
Airdrie
LOIP Priority  Purpose Venue Numbers of
young people
who attended
Positive outcomes of
consultation
To review/renew
the tasks/actions
outlined in the
Local Outcome
Improvement
Plan (LOIP) - 
Airdrie Action
Partnership (AAP)
is a collaborative
network 
consultation
exercise with
young people. 
@home
centre
9 
(1 group) Young people
participated in
consultation and
delivered a
presentation to
Airdrie Community
Board. Young people
achieved Saltire
Awards for
volunteering,
developed new skills,
gained confidence
and built social
connections.
Airdrie Action
Partnership
Winter Warmer
Event
Engagement
event
showcasing local
supports and
services available
to residents in
the Airdrie 
@home
centre
17
(1 group)
Young people were
actively involved in
planning,
organisation and
promotion and
assisted on the day
gained Saltire awards
and worked towards
SQA Award assisting
with an event.
Airdrie Action
Partnership
Christmas Appeal
Young people
were engaged in
supporting the
Christmas
appeal, helping
organise
donations,
liaising with
businesses who
offered support. 
@home
Centre
13 (1 group) Young people
achieved over 200
hours of volunteering. 
310 families
supported, 692
children and young
people received gifts
and clothing. 222 gift
cards distributed, 130
Christmas meals
Page 19 of 108

Page 20

distributed and 57
referrals made to NLC
Tackling Poverty
Team
Airdrie Action
Partnership
Winter warmers
Event
Young people
engaged and
involved in
organising the
event and
conducted a
digital needs
survey
@home 10 (1group) Volunteering enabled
young people gain
saltire awards work
towards SQA awards
in assisting and event. 
Young people
learned about health
and Safety
procedures and risk
assessments
Total young people 49 (4 groups) 
Wishaw/Shotts
LOIP Priority  Purpose Venue Numbers of
young people
who attended
Positive
outcomes of
consultation
Community
Board & LOIP
workshop (2nd) 
Consult/engage
with young
people re design
and content of
pop-up boards to
promote
Community
Boards & LOIPs
to young people.
St Aidan’s High
School
16
(1 group) 
Increased
awareness of
Community
Boards and LOIPs 
and met
Wishaw/Shotts 
Community
Engagement LOIP
Actions.
Total young people 16 (1 group) 
Community Safety Strategy Consultation with young people
The following is a summary of consultation that took place with young people around the
development of the Community Safety Strategy between August 2024 and August 2025.  
Community
Safety Strategy
Consultation 
Purpose Venue Numbers of
young people
who attended
Positive
outcomes of
consultation
Community
Safety Strategy
consultation
Consultation with
residents of NL
regarding the
development of
the new
Community
Safety Strategy
Online
consultation, NLC
Website
10 (individual
responses
received from
young people
under 25)
Helped inform
the new
Community
Safety Strategy
2025-2030
Face-to-face
consultation 
Consult with
Youth Voice
group around the
Pollock Hall,
Condorrat,
Cumbernauld
10 (1group) Helped inform
the new 
Page 20 of 108

Page 21

development of
the new CS
Strategy
Community
Safety Strategy
2025-2030
Face-to-face
consultation
Consult with
young people
around the
development of
the new CS
Strategy
Greenfaulds High
School,
Cumbernauld
28 (3 groups) Helped inform
the new
Community
Safety Strategy
2025-2030
Total young people 48 (4 groups)
In addition, 364 young people were also consulted around community safety issues as part of wider
youth engagement consultation which helped inform the new Community Safety Strategy. 
Participatory Budgeting 
The Community Partnership Team also engaged within young people within Chryston High
School through development of a Participatory budgeting project.  The following is a
summary of engagement that took place with young people between August 2024 and
August 2025. 
Participatory
budgeting 
Purpose Venue Numbers of
young people
who attended
Positive
outcomes of
consultation
Chryston High PB
Project
Participatory
budgeting
process with
young people
Chryston High
School
207 25 projects
identified and
voted on by
young people 
Total young people 207 
Page 21 of 108

Page 22

Appendix 2 
Case Studies - Youth Engagement and Consultation 
The following two case studies provide a flavour of the youth engagement and consultation
that has taken place with young people demonstrating a strong commitment to involving young
people in shaping their community and addressing issues that matter to them. 
Northern Corridor
Participatory Budgeting project - Chryston High School
The Community Partnership Team engaged with the Principal Teacher within Chryston High
School to discuss the possibility of a second Participatory process being developed within the
school.  The previous event was carried out with over 200 S1 students and this second project
was targeted towards S3 students within the school and was delivered over 6 weeks between
February/March 2025.
The Community Partnership Team as part of the Children & Young People LOIP priority in the
Northern Corridor carried out congoing consultation with young people which had identified
Mental Health as an issue with young people identifying the need for a project that addressed
the issue, for example, increased mental health support for young people. 
The Community Partnership Team allocated £10,000 was allocated from the NLC UK Shared
Prosperity Fund delivered through the Community Partnership Team towards the Participatory
Budgeting project which helped meet the NL Programme of Work: Resilient People by
supporting young people to help reduce inequality by deciding how a £10,000 budget is spent
on health-related issues that affect them, including mental health concerns.
This project also helped meet the Plan for North Lanarkshire Ambitions of improving
engagement with communities and develop their capacity to help themselves and improving
the involvement of communities in the decisions, and development of services and supports,
that affect them,
207 young people S3 students participated in the project and put forward ideas on three key
themes.   S3 students were provided with the opportunity to participate in a voting process
through Microsoft Forms to determine the successful theme/projects within the school. Twenty-
five projects were identified and voted on by young people and the priority theme chosen by
young people through the voting process was Mental Health.
The project contributed to the Northern Corridor, Children & Young People LOIP priority and
produced several positive outcomes for young people.  Young people reported a high level of
satisfaction with the process and project delivery and in addition to deciding how the defined
budget was spent, young people were able to influence decision-making processes, which
meant that the budget spend was meaningful to them and they were also able to access
successful project activities that helped improve their health and wellbeing. 
Wishaw 
Local Development Programme Awareness Raising Workshops, St Aidan’s High
School, Wishaw (9th June 2025)
Page 22 of 108

Page 23

The Senior Conference for the new S6 takes place every year within St Aidan’s.  This
conference is an opportunity for the new 6th years to learn about professions, what’s happening
in their communities and other useful skills and information to help them in their future careers,
etc.  Members of the Community Partnership Team had been approached about delivering a
workshop to 4 groups of S6 students.  After discussion the CPO’s facilitating the workshop
designed a workshop which not only highlighted the work and role of the Community
Partnership Team within the Council but also the Local Development Programme.  These
workshops would give the opportunity for the Community Partnership Team to engage with
young people (part of the Community Engagement LOIP actions including reaching out to
several heard voices and general promotion of the Community Boards).  These workshops
also related to other Wishaw and Shotts LOIPS as listed below: - 
Experience/Outcome Curricular Theme LOIP Link
Health and Wellbeing: Social
Wellbeing:
• Representing my wider
community encourages my self-
worth and confidence and allows
me to contribute and
participate.
• Meet challenges, manage and
build relationships. 
Political Literacy:
• Engage in activities which
encourage enterprising
attitudes. 
Community Learning and
Development:
• With a focus on bringing
about change in their lives
and communities 
Mental Health and Wellbeing 
Community Engagement 
Environment 
94 young people aged between 17 years and 18 years who lived in the Wishaw, Fortissat and
Murdostoun wards of the Council took part in the workshops which consisted of a PowerPoint
presentation highlighting the work of the Community Partnership Team and thereafter
workshop activities highlighting the Local Development Programme process.  This culminated
in groupwork and discussion between the facilitators and the young people to gain ideas on
projects they felt should be in their local areas.  Participants were taken through the timeline
process from application, feasibility, consultation through to procurement process and then
they were given a scenario and a location e.g. a cogroups: -in Wishaw or Shotts and the
scenario cards gave information on a group wanting to complete a local Heritage Project or,
MUGA, Children’s Play area or Welcome Wall for the area, they were then asked the following
questions in groups:- 
• Who would you consult with
• How would you consult them
• Do you have any ideas for an LDP in your own geographical area where you live? 
The engagement tools used to engage with the young people were interactive, using visuals
which would encourage participation and discussion.  Young people had the opportunity to talk
and look at the geographical area where they live identifying potential future ideas for the LDP
programme. 
Page 23 of 108

Page 24

Page 24 of 108

Page 25

North Lanarkshire Council
Report
Communities Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    SP/MC Date 27/10/25 
Community Board Local Development Programme 
From  Stephen Penman, Chief Officer (Strategy and Engagement) 
E-mail Penmanste@northlan.gov.uk 
Costellom@northlan.gov.uk  Telephone 07725 289559 
1. Background 
1.1 The Policy and Strategy committee agreed, in March 2019, that all projects from
2019/20 onwards, recommended by Community Matters partnerships (now replaced
by Community Boards) should be subject to agreement by the former Youth, Equalities
Executive Summary
This report provides an update on progress with the Community Board Local Development
Programme (LDP) projects previously approved by committee. 
In addition, the report seeks in-principle approval for new potential projects as proposed by
local community groups.
Recommendations
It is recommended that the Communities Committee: 
(1) Recognises progress with the current project portfolio and approve projects which
have potential for delivery in future financial years depending on availability of funding
and community support (Appendix 1).
(2) Recognises the capital budget allocated to the LDP for each Community Board area
in the new capital programme from 2024/25 onwards. (Appendix 2).
(3) Acknowledge the examples of completed project case studies (Appendix 3)
(4) Recognises the Programme of play area projects for 2025/26 (Appendix 4).
(5) Approves amendments to existing projects and further project proposals and project
criteria.
(6) Acknowledges current challenges faced in achieving delivery of the Local
Development Programme; 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (20) Improve the involvement of communities in the decisions, and
development of services and supports, that affect them
Programme of Work All Programmes of Work
Item 3
Page 25 of 108

Page 26

and Empowerment Committee before proceeding beyond the in-principle/ conceptual
stage. Further approvals are now sought through the Communities Committee as
required. 
1.2 The current capital programme was reviewed and a new capital programme for 2024/25
to 2028/29 was agreed by Council in March 2024. The LDP has secured funding for
the new five-year plan totalling £10.369 million. The allocation of funding includes a
new capital allocation to support the Community Asset Transfer (CAT) process. A total
amount of £2.3 million from the LDP has been allocated to support CAT over the five-
year budget period. This funding will be augmented by £670,000 from the Shared
Prosperity Fund to provide a £3 million fund to support CAT over the next five years. 
1.3 The indicative allocation of LDP funding by Community Board area is set out in the
table in Appendix 2 of this report. The level of funding shown for each Community Board
area excludes the CAT element of £2.3 million, which will be allocated via the process
approved by the Policy and Strategy Committee in June 2024. 
1.4 Appendix 2 shows the allocation of LDP by Community Board area over the four years
of the current capital plan. The allocation for each Board area is a calculation based on
population size and deprivation. The population percentages are drawn from the
National Records for Scotland 2020 mid-year estimates and the 2020 Scottish Index of
Multiple Deprivation (SIMD). 85% is allocated based on population, while 15% of the
LDP budget is allocated based on deprivation. The 15% figure is drawn from the
proportion of people who were “income deprived” in the 2020 SIMD. The 2025/26
allocation includes the carry forward from the 2024/25 LDP budget allocation. 
1.5 Appendix 3 of the report contains case studies of a recently completed LDP projects,
Holytown Community Garden, Lochside play area in Gartcosh and Overtown outdoor
gym. The purpose of the case studies is to provide elected members with greater insight
into how LDP projects are developed and delivered, from initial proposals through to
the completion of the project. All future LDP reports to Committee will include LDP
project case studies.  
1.6 One of the key priorities for the LDP is the delivery of upgraded and new play facilities
across all nine Community Board areas. Appendix 4 illustrates the play area
programme for 2025/26, to be delivered through LDP and with match funding from the
Scottish Government’s play area renewal funding. 
1.7 The amount allocated to each area reflects a reduction of up to 10% earmarked for
delivery and other associated costs in relation to agreed projects. This will include
technical support, tendering processes, design and project management and
administration. 
2. Report 
Criteria for Local Development Programme 
2.1 To be eligible for inclusion in the Community Board Local Development Programme,
projects must meet the priorities of the Local Outcome Improvement Plan and
substantially subscribe to previously agreed criteria. The following are examples of
some of the key criteria: 
• link to LOIP priorities
• be publicly visible and accessible.
• come from community groups or individual.
Page 26 of 108

Page 27

• improve community safety.
• benefit a large number of people.
• improve the appearance of an area.
• maximise the use of alternative sources of funding.
• be a capital projects on council owned land. 
2.2 All Local Development Programme proposal forms should indicate which, if any, of 
the Local Outcome Improvement Plan priorities the project supports. Where the 
project does not align with identified priorities, evidence must be provided to show how
the project will support improved local outcomes. 
Project progress 
2.3 Information on current and potential future projects is contained within Appendix 1. The
figures in Appendix 1 are indicative potential project costs and no budget has been
allocated to specific projects. 
2.4 The Community Board Local Development Programme highlights the council’s
commitment to community led neighbourhood regeneration. Prioritisation work has
been undertaken taking account of the allocated budgets and criteria to schedule
project delivery of the current holding over the five-year budget cycle. These priorities
may change as projects develop, and clearer costs become available. 
2.5 Where feasibility checks have identified that the project is not viable, the
recommendation within Appendix 1 is to delete such projects from the list moving
forward. 
Projects seeking approval 
2.6 Table 1 provides a summary of the LDP projects seeking committee approval in this
cycle. In total, eleven projects across six Community Board areas are seeking approval.  
Table 1. Projects seeking approval from this cycle of Community Boards 
Community
Board Area
Project Name  Project Description  Project
Potential Cost 
Bellshill Holytown play area Upgrade to play area £100,000
Bellshill  Mossend play area Upgrade to play area £100,000
Coatbridge Shawhead Underpass
project
Upgrade to Shawhead
under path.
TBC
Coatbridge  Dunbeth Bowling club
entrance pathway
Upgrade to access path TBC
Cumbernauld Allanfauld Road Seafar
play area
Upgrade to play area £100,000
Cumbernauld Cumbernauld House
lighting
Install solar lighting in
pathway
TBC
Kilsyth and
Villages
Hillside Park play area Upgrade to play area £80,000
Kilsyth and
Villages
Old Mill View MUGA Install a Multi-Use
Games Area
£80,000
Motherwell Muirhouse Outdoor Gym Install an outdoor gym
facility
£35,000
Northern Corridor Bluebell play park upgrade Upgrade to play area TBC
Page 27 of 108

Page 28

Northern Corridor Village Park Play Area,
Glenboig
Upgrade to play area £50,000 
LDP programme development and delivery 
2.7 Graph 2 below shows the breakdown of LDP projects by development stages for the
period up to the beginning of September 2025. It shows the scale of the LDP
programme, in terms of the number of projects that have been approved (potential) and
are in progress, a total of, eighty eight and the number that are under development 47
and seeking approval (11). This is a large number of projects, fully detailed in Appendix
1, and indicates the continuing high level of demand for LDP projects from the
Community Board areas of North Lanarkshire. 
Graph 1. Number of LDP projects by development stage as of September 2025 
2.8 Further detail at a Community Board level is provided in Graph 2. This illustrates the
number of projects at each development stage by Community Board area. Graph 2
shows more detailed information on the status of projects for each Community Board
area. As with the information included in each of the graphs, this will be updated for
each future report. 
Graph 2. LDP projects by development stage by Community Board area September 2025 
Page 28 of 108

Page 29

3. Measures of success 
3.1 Projects delivered within agreed timescales taking into account all relevant factors and
budgetary considerations. 
3.2 Local communities are involved from the earliest stage in the development of project
designs and delivery and are generally satisfied with the outcome. 
3.3 People in communities whose voices are seldom heard are engaged in putting
forward/influencing projects within their community. 
3.4 The governance role of the Community Boards is consolidated in terms of project
development, approvals, and monitoring processes.   
4. Supporting documentation 
4.1 Appendix 1    Community Board Local Development Programme 2023/24 onwards.
4.2 Appendix 2    Budget Information.
4.3 Appendix 3    Your community asked, we delivered: LDP project case studies. 
4.4 Appendix 4    Play Area Development List 2025/26.   
Stephen Penman
Chief Officer, (Strategy and Engagement) 
Page 29 of 108

Page 30

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If yes, please provide a brief summary of the impact? 
If yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Each of the projects in the attached Appendices, if deemed appropriate for delivery
and where budget is available is supported through funding available via the
Community Board Local Development Programme capital allocation. Consideration
will also be given to maximising external and other partner contributions where
possible. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data? 
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
Page 30 of 108

Page 31

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Several of the projects will have a positive effect on the local environment,
contributing to safer areas to play and addressing issues traffic congestion in specific
areas. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The LDP is discussed widely with community groups and local consultation will be
communicated as required. In conjunction with local communities, a communications
approach will ensure that projects are promoted positively. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
There are no significant financial risks which have been identified at this stage in the
financial year, however this will continue to be closely monitored. Some projects may
not proceed as a result of e.g., community consultation or site investigations and
outstanding budgets will be re-allocated to other projects which will be reported to a
future Community Board. It should be acknowledged that there are nationwide
challenges in relation to supply of materials and there is also an impact on material
costs leading to potentially higher contract costs which could impact on delivery of
projects. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Page 31 of 108

Page 32

Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
Information is provided regarding upgraded and new play areas across North
Lanarkshire. Youth groups and organisations are involved in community boards and
participate in a variety of engagement events related to project development and
Local Outcome Improvement Plans 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒ 
Page 32 of 108

Page 33

Appendix 1
Airdrie
Project Name Project
Description Progress Budget Notes
Holehills Kickabout
Area
New Play
Area
Under
Development TBC 
Potential to
resurface the
MUGA with
polymeric surface,
CPO currently
liaising with
Education.
Proposal to be
developed.
Leaend Road Car Parking  Under
Development TBC Feasibility checks
to be undertaken.
Calderbank Skate
Park Play facility Under
Development TBC Site visit to be
arranged.
Moss Avenue Parking
Potential
clearing
existing
lockups and
resurfacing.
Under
Development
£15,000 -
£20,000
Project to go to
roads for
approval. 
Projects team to
complete drawing
specs.
Longriggend welcome
sign
Village
welcome sign
Under
Development
Max £
5,000
Site visit
undertaken. 
Earl Avenue
Caldercruix Car parking Under
Development TBC 
Projects team to
complete
feasibility checks. 
Affric Ave Car Park Car parking Potential/ In
progress
£15,000 -
£20,000
Projects team to
complete drawing. 
Chapelhall Fencing
Christmas Tree 
Potential/ in
progress £2,000
Gate to be
ordered, CPO
liaising with Street
Scene
Page 33 of 108

Page 34

Lost Villages
Heritage
project to
create a
memorial to
the “lost
villages” near
Airdrie
Potential/ In
progress TBC
Feasibility checks
& consultation to
be done. Location
to be confirmed.
Airdrie Boulevard of
Lights
Replace trees
that must be
removed
along with
erect a
temporary
metal
structure
beside
/behind the
new trees to
increase the
lights effect
whilst they are
established.
Potential/ In
progress £10,000 
Proposal received
- 
The Arbour team
and lighting team
are taking lead on
this project.
Ballochney Road
Plains Path
installation 
Surfacing
pathway 
Potential/ In
progress £20,000 
Local consultation
undertaken. 
Currently waiting
on results from
consultation.
Airdrie Leisure BMX
Pump Track, 
Funding to
support
regenerating
of the facilities
or build a new
pump track.
Pump Track -
Play
Potential/ In
progress  £170,000 
Procurement
process to be
completed autumn
2025.
Calderbank Welcome
Road Sign 
Welcome
Sign
Potential/ In
progress £3,000
A site has been
identified, north of
Brownsburn park. 
proposal form
completed. 
Projects team
completing design
spec.
Page 34 of 108

Page 35

Caldercruix Heritage
Project 
Heritage
Project
Potential/ In
progress £42,944 
Panels currently
being prepared
and created. 
Projects team
working with
Graphics to
conclude the
project.
Caldercruix Play Area 
Caldercruix
Play Area
Upgrade
Potential/ In
progress £100,000 
Procurement
process
completed.
Contract awarded.
Chapelhall/ Bellside
Road Parking  Surfacing Potential/ In
progress £40,000 
Design spec
completed and be
delivered through
the Infrastructure
Framework.  
Community
Partnership Initiatives 
Potential/ In
progress £10,000 
Community Safety
CCTV
CCTV
installations
Potential/ In
progress £25,000 
CCTV agreed for
Luing, Petersburn,
cameras now
operational.  
Milton Court Social
Place  Seating Area Potential/ In
progress
£8,000
(TBC)
Awaiting a
response from
chair of Tenants &
Residents 
Projects team to
complete
drawings. 
Page 35 of 108

Page 36

Petersburn Main Play
Area 
Renew
existent play
area and
concentrate
all play
provisions in
one play area
Potential/ In
progress £100,000 
Procurement
process
completed.
Contract awarded
Caldercruix Wheeled
Sport Area 
Wheeled
sports area
Potential/ In
progress £50,000  Going to
procurement in
autumn of 2025 
West end/ Centenary
Park 
New
Interpretation
boards
Potential/ In
progress £15,000  New lecterns have
been installed. 
Centenary and West
End Park sculpture
garden
Create a
sculpture
garden in the
park- heritage
project 
Potential/ In
progress £5,000 Initial stage of the
project completed
Toddlers Play Area,
Varnsdorf way 
Toddlers Play
Area
Project
removed £50,000
Project nor
progressing due to
lack of community
support
Craigneuk Play Area,
Calderigg place,  Play Area Project
Completed £92,646  Project completed 
Page 36 of 108

Page 37

Bellshill
Project Name  Project
Description
Progress Budget Notes
Shirrel Avenue
Parking
To re-
surface/improve a
disused lock-up
site to ease
amount of parking
on Shirrel
Avenue. 
Under
Development
TBC Proposal received;
feasibility being
assessed. 
Holytown Play
Area Upgrade
Upgrade the
Holytown play
area due to
concerns about
access to the play
area and bad
conditions within
the play area. 
Seeking
approval
£100,000 Relocation of play
area to be considered.
Community
consultation
undertaken for local
opinion of relocating
the play park. 
Mossend Play
area Upgrade
Upgrade the play
area due to
concerns about
access to the play
area and bad
conditions within
the play area
Seeking
approval
£100,000 Site visit to be
arranged. Positive
community
consultation. 
Ella Gardens
Mossend Parking 
Additional parking
spaces from
house 9-23 - will
provide up to 9
parking bays 
In progress/
Potential
£20,000 
Design spec
completed.
will go through the
new Infrastructure
Framework 
Juniper Place
Parking Viewpark 
Additional parking
spaces
In progress/
Potential
£15,000 
Design spec
completed, will go
through the new
Infrastructure
Framework 
Page 37 of 108

Page 38

Alder Bank
Parking Viewpark 
Additional parking
spaces
In progress/
Potential
£15,000 Design spec to be
completed.
will go through the
new Infrastructure
Framework.
McCracken Drive
Parking Viewpark 
Additional parking
spaces
In progress/
Potential
£15,000 Potential for 8 bays.
Design spec
completed.
will go through the
new Infrastructure
Framework.
Belvidere
Crescent Parking
Bellshill 
Additional parking
spaces
In progress/
Potential
£15,000 6 potential spaces.
Design spec to be
completed will go
through the new
Infrastructure
Framework 
Clay Crescent
Muga & Play
Area Renewal 
The area distinctly
lacks sufficient
open space public
sports facilities.
Utilising existing
red ash paved
football pitch
In progress/
Potential
£160,000  Will be procured
Autumn 2025. 
Page 38 of 108

Page 39

Community
Safety CCTV
Additional CCTV
in locality in
conjunction with
community safety
partners 
In progress/
Potential
£25,000 
Holytown CCTV -,
camera operational at
the end of April 2025. 
Community
Partnership
initiatives 
In progress/
Potential  £10,000 
Funding to support
partnership initiatives.
Liberty Road,
Parking Bellshill 
Additional parking
spaces
In progress/
Potential
£30,000 
Potential for 8 spaces
only as services
present near location. 
Site for parking will be
in South of Junction,
design spec to be
completed    
will go through the
new Infrastructure
Framework.
Bellshill Gateway-
community
Garden 
Bellshill Gateway-
community
Garden 
Completed £25,000  Project completed in
April 2025.
Main Street,
Holytown
Community
Garden 
Community
Garden
Completed £25,000 Project Completed,
official opened
September 2025. 
Page 39 of 108

Page 40

Coatbridge
Project Name  Project
Details 
Progress  Budget  Notes 
Avenue of Lights  Trees on both
sides of Bank
Street from
Blairgrove
Court to the
Cenotaph. 
Under
Development 
TBC  Projects team to
complete initial
feasibility checks. 
Kirkwood Tenants &
Residents
Community Garden 
Install
Community
Garden 
Under
Development 
TBC   
Proposal received
Design spec has
been completed,
and survey is with
the community
group 
Lomond Road
Townhead Parking
Bays 
potential
creation of
parking bays
on grass island
to alleviate
congestion on
access road. 
Under
Development 
TBC 
Projects team
completed layout
plan, consultation to
be completed. 
Local consultation
underway
Cenotaph floral
displays 
Large artificial
hanging
baskets at the
cenotaph in
West End Park
on Bank
Street. 
Under
development 
TBC Project in early
stages of
development. 
Dunbeth Bowling
Club entrance
pathways 
resurface
entrance
pathway 
Seeking
approval
TBC  Proposal received:  
CPO arranged
meeting on site with
proposers
regarding surfacing
on pathway towards
bowling club. 
Projects team
assessing costs.
Shawhead
Underpass Project 
Renovation of
the Shawhead
underpass 
Seeking
approval 
TBC Site meeting to
scope out project.
project  
In the early stages,
projects team is
looking for
contractors
Page 40 of 108

Page 41

regarding works &
costs to be
confirmed. 
Shawhead in Bloom  Community
growing project
to enhance
public spaces
around
Shawhead 
Seeking
approval
TBC  Community walk-
about took place to
develop the project.
Welcome to
Coatbridge
Installation 
Stonework
welcome to
Coatbridge
installation end
of A725, start
of Whifflet
Street. No
visible
indicator exists
presently to
say that you
are entering
Coatbridge. 
Potential/ In
progress 
TBC approx.
£15,000  Site location moved
to the other side of
the road. Drawings
to be completed by
Projects team. 
Bargeddie MUGA  Development
of Bargeddie
MUGA 
Potential/ In
progress 
£90,000  Going to
procurement
autumn 2025
Greenend Play Area  Full refurb.
Add to
wheeled sports
provision, extra
play
equipment 
Potential/ In
progress 
£100,000  Procurement
concluded, contract
awarded. 
Whifflet Park
Additional Swing Bay 
Environmental
Improvement 
Potential/ In
progress 
£5,000  Included in current
procurement 
Bargeddie Play Area  Play Area
upgrade 
Potential/ In
progress 
£100,000   Procurement
completed, contract
awarded. 
Greenend Wheeled
Sports Area 
Development
of Greenend
Wheeled
Sports Area 
Potential/ In
progress 
£50,000  Plan to go to
procurement 
Community Safety –
CCTV   
Additional
CCTV in
locality in
conjunction
with
Community
Potential/ In
progress 
£25,000    Investigation of a
permanent camera
in Shawhead.
Page 41 of 108

Page 42

Safety
Partners. 
Carnbroe Heritage
panels 
Install Heritage
panels to
safely screen
mine cap in
community
garden 
Potential/ In
progress 
£5,000 Fencing completed,
final project
inspection to be
undertaken.
Kelso Quadrant
Community space, 
Create a
useable
community
space on
currently
unused waste
ground to rear
of properties 
Potential/ In
progress 
£10,000 On site meeting
with locals, positive
response on design
plans. 
Works pending on
additional panel to
be attached to the
fence. 
Shining Stars
Outdoor Learning
Space Project 
Utilise space at
rear of building
to create
secure
learning and
performance
space for ASN
theatre school 
Potential/ In
progress 
£10,000 Project on hold till
further notice due to
property issues.
Community
Partnership
Initiatives 
Potential/ In
progress 
£10,000  
Langloan Community
Space 
reclaiming
community
spaces in
Langloan. Goal
Posts, roll bars
& seating
area. 
Completed  £5,000 Project completed
August 2025 
Secret Garden
(Friends of Dunbeth
Park Community
Garden) 
Partnership
with Friends of
Dunbeth Park 
Completed  £10,000 Initial phase of the
project completed. 
Page 42 of 108

Page 43

Cumbernauld
Project Name  Project Details Progress Budget Notes
Kildrum
Welcome
Signage
Three metal
signs to be
installed saying
“Welcome to
Kildrum,” like
the “Welcome
to Seafar” signs
recently
installed.
Under
Development £2,000 
Feasibility checks to
still be arranged 
locations and
installation to be
confirmed. Site visit
to be arranged.  
Kildrum
Entrance
Feature
Entrance wall
feature to be
constructed. It
is requested
that this be
able to
accommodate
the metal
house shields
which came off
the exterior of
the former
Cumbernauld
High School
buildings
before
demolition. 
Under
Development TBC
Feasibility checks to
still be arranged 
between signage or
entrance feature 
Potential site found
Cumbernauld
New Town
Heritage
Signage
Refurbish and
reinstate
original
Cumbernauld
New Town
signage, to
designs by
town artist
Brian Miller
Under
Development TBC
Proposal form
received. 
Location to be
moved to Park, cost
and budget
required.
projects team
looking into
feasibility of design
Page 43 of 108

Page 44

Arria Signage
Signage from
Craighalbert
Road to Arria
Sculpture by
Andy Scott.
Looking at
creating 3- 6
signs
Under
Development £1,500
New application has
been submitted final
site visit to be
completed.
Lime Crescent,
Abronhill Parking Under
Development TBC 
Delays as site
location has been
changed, site visit to
be arranged.
Abronhill Notice
Boards
Install several
notice boards
in Abronhill
Under
Development
£7,000
approx.
Sites identified
across Abronhill. 
Carbrain
Community
Notice Board
Install several
notice boards
in Carbrain
Under
development
£5,000
approx.
Sites identified
across Carbrain 
Page 44 of 108

Page 45

Allanfauld Road
Seafar Play
Area
Install a new
play area at
Allanfauld
Road, Seafar,
Cumbernauld
Seeking approval £100,000
Schools’
consultation on play
area design,
undertaken.
Cumbernauld
House Park
Lighting
Install solar
path lighting at
Cumbernauld
House Park. 
Seeking approval TBC
Feasibility and
community
consultation
undertaken, with a
positive outcome for
both. 
Gap Site
Hoarding 
Design of the
hoardings to
include
historical
information and
images of the
Village
In
progress/Potential
£6,000
approx.
Proposal form
received. Hoardings
to be replaced.
passed to projects
team for feasibility. 
Currently with
Projects team for
design spec and
site visit.  
Afton Road,
Parking  Parking In
progress/Potential £15,000 
Potential for two
additional parking
bays by changing
orientation. (due to
presence of trees)
Design completed 
Ready to go out for
tender. 
Birch Road,
(Abronhill)  Parking In
progress/Potential £10,000 
Consultation sent
out - positive
responses received 
Will be delivered by
new infrastructure
framework 
Block of 6 and 4
bays to be created
Page 45 of 108

Page 46

Cumbernauld
Peace Garden
Memory Walk 
Memory Walk In
progress/Potential
£10,000
for initial
phase 
Completed initial
site visit for
connecting path to
memorial walk. 
Meeting with
greenspace for
location of proposed
entrance.
Works ongoing.
Design spec being
completed. May be
separated into
phase works.
Eastfield Play
Area  Playpark In
progress/Potential £100,000
Procurement
undertaken,
contract awarded. 
Melrose Road,
Greenfaulds 
Parking
Improvements -
removing a bay
and lining
In
progress/Potential £10,833
Awaiting
confirmation from
Roads 
Projects team
followed up with
contractors.
Community
Partnership
Initiatives
Funding to
support
community
partnership
initiatives
In
progress/Potential £10,000 
Page 46 of 108

Page 47

CCTV  CCTV In
progress/Potential £25,000  Stonylee Road
CCTV - proposal
received 
Kilsyth and Villages
Project Name  Project Details Progress Budget Notes
Kilsyth Old
Peoples Welfare
Committee –
centre renovations
Contribution
towards
improvements
works at Old
Library
(Burngreen)
Under
Development TBC
Organisation seeking
third party funding
support for essential
building and facility
improvements. Proposal
will require to be
updated.
Connecting Kilsyth
Pathway Project
Clean Up and
Signage
pathway
projects clean
up and signage
Under
Development TBC
consultation to be
undertaken
Phase 1 - Clearing &
Signage: Project
proposal has been
submitted. Phase 1
identified, and meeting
has been organised to
identify responsibilities.
Page 47 of 108

Page 48

Signage for Kilsyth
Sign posts and
notice boards
creation &
installations
Under
development TBC Location for signage
confirmed. 
Hillside Park
replacement play
park
Remove old
equipment and
move the park
to a more
central point but
close to the
original sight
Seeking
approval £80,000
Residential and school
consultation completed
with positive results for
both.
MUGA Old Mill
View
This is a
request to
install a MUGA
(Multi-Use
Games Area)
next to the
existing play
park at Old Mill
View, Croy
Seeking
approval £80,000 
Feasibility completed, 
community consultation
completed with positive
results. 
Page 48 of 108

Page 49

Colzium Park, play
area
Renewal of play
area
In progress/
potential £100,000 
Feasibility checks
complete. 
Proposal form has been
completed and
submitted. School
consultation undertaken
with positive results.
Design spec. being
drafted. 
CCTV 
In
progress/Potenti
al
£10000 Barlandfauld CCTV
completed: £14k
Rennie Road Play
Park, 
Replace Play
Area
In
progress/Potenti
al
£80,000 Procurement concluded,
contract awarded. 
Page 49 of 108

Page 50

Community
Partnership
Initiatives
Funding to support
partnership
initiatives 
In
progress/Potenti
al
£1500 
Motherwell
Project Name Project Details Status Budget Notes
Mural Painting,
King George V
Park Craigneuk
To create a
mural on the
side wall of the
pavilion at King
George V Park.
Under
development
TBC Proposal submitted,
consultation with
stakeholders underway
“Breathing space”
benches Craigneuk
Install ‘Breathing
Space’ bench to
replace well
used, old bench
and encourage
positive mental
health and
wellbeing.
Under
Development
TBC Proposal submitted from
Feasibility undertaken. 
Doon Street play
area
Addition of play
panels to the
existing play
area
Under
Development
TBC Proposal developed,
consultation to be
undertaken.
Outdoor Gym
Muirhouse Park
Installation of an
outdoor gym
facility.
Seeking
approval
£35,000 Community consultation
completed in August 2025.
Page 50 of 108

Page 51

Picnic benches for
Woodilee playpark. 
Build and
maintain approx.
3 or 4 picnic
benches
Potential/ In
progress
TBC Projects team to check with
street scene regarding
availability on picnic benches 
Picnic bench to be ordered.
Online survey to be created
for local opinion.
Duchess Park
Renewal of
Equipment
Replace old
equipment in
Duchess Park
Potential/ In
progress
TBC 
Proposal draft received.
CPO to support development
of proposal, Project team to
assess indicative budget. 
Community Consultation
completed July 2025.
Tommy Gemmell
Statue
LDP funding to
provide a plinth
and upgrade the
immediate
surrounding of
the statue in
Craigneuk
Potential/ In
progress
£75,000
external
funding.
LDP
funding
£34,000
Design of statue being
finalised. Site meeting
undertaken to discuss design
of surroundings and plinth for
the statue. 
Community
Partnership
Initiatives
Funding to
support
community
partnership
initiatives
Potential/ In
progress
£10,000 
Community Safety
CCTV
Additional CCTV
in locality in
conjunction with
Community
Safety Partners
Potential/ In
progress
£25000 Muirhouse CCTV camera
installation completed and
operational.
Page 51 of 108

Page 52

Fife Drive,
Forgewood play
park improvement
and expansion
Replace missing
equipment and
consider adding
some more play
equipment to
improve the park
Potential/ In
progress
£80,000 Procurement undertaken,
contract awarded.
George St Park,
constructing
walking path
LDP form
received from
the group
regarding
constructing a
walking Path
round the park,
with bench, Trim
trail, and a bog
garden etc
Potential/ In
progress
Indicative
£80K to
£100K: 
Draft layout completed,
second phase of trim trail to
be completed. Proposers
happy with design. 
Consultation completed with
very substantial support for
the project. Construction
drawings to be completed.
Coursington
Crescent Parking
Additional
parking
Potential/ In
progress
£15,000 
Design still to be completed 
To be delivered through
Infrastructure Framework.
Jerviston Play Area
Replacement
Play Area
replacement
Potential/ In
progress
£100,000 
Procurement completed,
contract awarded.
Page 52 of 108

Page 53

Outdoor Gym,
Glenmore Rd-
Lomond Walk,
Newarthill
Development of
an outdoor gym
for community
use
Potential/ In
progress
£40,000 
To be procured in Autumn
2025.
Newarthill Tree
Lighting Project
Community
Council want to
light up five trees
next to the
welcome to
Newarthill
entrance feature
Completed £15,000 Project completed June
2025.
Rail Bridge project
Craigneuk 
Art project at the
rail bridge,
improvements at
Glencairn road. 
Removed TBC Project removed, due to lack
of support from the original
proposer. 
Page 53 of 108

Page 54

Northern Corridor
Project Name Project Details Progress Budget Notes
Millerston Solar
Lights project 
Provide eco-
friendly solar eye
ground lighting
(solar lighting) at
pathways next to
Dunalistair play
area. 
Under
Development
TBC Feasibility of
project under
review.
Ramoan play area,
Glenboig - new
entrance
New entrance Under
Development
TBC Plan is to open
up access to
the existing
play area
Cardowan Pump
Track 
Develop a pump
track facility on ash
site next to
Cardowan MUGA,
Frankfield Road
Under
Development
TBC No further
development
to date.
Bluebell Park,
Stepps Upgrade 
Replacement of old
logs and
development of
outdoor class
funded by Scottish
Government 
Seeking
approval
TBC  Issue with
water voles,
checks with
biodiversity
officer to
commence. 
Consultation
completed.
Design spec
required.
Village Park Play
Area, Glenboig
To redevelop areas
of Village Park,
play area, Glenboig
via Scottish
Government Play
Park Renewal
Fund.
Seeking
approval
£50,000  Feasibility
checks
completed by
Projects team. 
Consultation to
be completed. 
Design spec to
be completed.
Page 54 of 108

Page 55

Moodiesburn
Outdoor Gym 
Establish an
outdoor gym facility
Potential/ In
progress
£35,000 Proposal form
signed by
Moodiesburn
Community
Action.
Location
updated: Pivot
Community
Centre,
Glenmanor
Drive.
Procurement
autumn 2025. 
Auchinloch
Community Council
Outdoor gym 
Establish outdoor
gym facility in
Auchinloch 
Potential/ In
progress
£20,000 
Project
identified
through
Auchinloch
Community
Action Plan.
Feasibility
checks on
potential sites
completed. 
Procurement
completed,
contract
awarded. 
Path Improvement
works at Strathkelvin
Railway Path,
Moodiesburn 
The project would
involve
improvement works
at the path area at
Strathkelvin
Railway Path,
Moodiesburn (next
to the Bow Wow
Right of Way
entrance). Works
would involve
scraping back
shrubs and bushes 
Potential/ In
progress
£10,000 Proposal
received.
Positive on
Feasibility
checks 
Establishing
full scope of
project.
Pivot Centre
Moodiesburn
Noticeboard 
The project would
provide a
noticeboard on site
Potential/ In
progress
£3,500  Noticeboard
ordered,
Page 55 of 108

Page 56

near the Pivot
Centre,
Moodiesburn to
enable local
community groups
to publicise
community events
and highlight
activities and
services provided
in the Moodiesburn
area. 
awaiting
delivery.
Moodiesburn Play
Area 
Create play area at
top end of
Moodiesburn 
Potential/ In
progress
£75K 
Procurement
concluded,
contract
awarded. 
Cardowan
Community Meadow
Outdoor Gym 
Establish outdoor
gym facility in
Cardowan.
Potential/ In
progress
£20,000 
Procurement
concluded,
contact
awarded.
Page 56 of 108

Page 57

Moodiesburn
Christmas Tree
Project 
Erect permanent
Christmas Tree in
Moodiesburn.
Potential/ In
progress
£3,000 Project
delayed until
2027.
CCTV Community
Safety 
Additional CCTV in
the locality in
conjunction with
community safety
partners 
Potential/ In
progress
£15,000  No CCTV
projects at
present.
Community
Partnership
Initiatives
Funding to support
community
partnership
initiatives
Potential/ In
progress
£3,000  No
partnership
Initiatives at
present.
Lochside Play Area,
Gartcosh 
Refurbish Play
Area
Completed £98,000 March 2025, 
Site officially
opened.   
Shotts
Project Name Project
Description
Progress Budget Notes
Eastfield Harthill future play
park improvements 
To improve
play provision
in the local
community:
Renew items
of equipment
to improve play
provision
Under
Development
TBC  
Site visit
completed.
Site requires
a full
renewal. 
Proposal to
be submitted, 
Initial
consultation
event with
local
children.
Page 57 of 108

Page 58

Shottskirk Road Shotts Car
Parking Improvements
To improve
accessibility
and car
parking locally
Under
Development
Indicative
£20,000
Proposal
form
submitted.
Positive
feasibility
check. Local
consultation
to be
undertaken. 
Alexander Peden PS
Harthill
Community
access to play
and
greenspace
opportunities.
Project to
install fencing
and installing
gate
Under
Development
TBC  Working with
the 
Projects
team in
Education
services to
follow up on
next steps in
terms of
agreement of
design.  
Allanton sports pitch 5 a
side goal posts 
Allanton sports
pitch 2 x 5 a
side goal posts 
Under
Development
TBC Proposal
form
received. 
Consultation
with local
community
underway. 
Stane Gardens, Additional
benches 
Request for
additional
benches at
Stane Gardens
Potential/ In
progress
£3,000 
Site visit to
be
rescheduled
Projects
team to gain
clarification
on projects
future. 
Project
pending
removal
depending
on local
interest. 
Community Partnership
Initiatives
Funding to
support
community
Potential/ In
progress
£2,000 
Page 58 of 108

Page 59

partnership
initiatives 
Ts housing Stane Corner  Manse Road
defining park
bays and
directional
signage
improvement
to be
undertaken
along with a
community
awareness
campaign to
promote car
park usage
Potential/ In
progress
£10,000 
Signage
installed
New car park
sign
installed.
Directional
signage on
main road to
be installed.
Bays to be
lined on
flagstones.
Road sign to
be installed
in a suitable
location.
Community Safety CCTV   Additional
CCTV in the
locality in
conjunction
with
community
safety partners 
Potential/ In
progress
£25,000 
Shotts Leisure Centre
Outdoor Gym 
Outdoor Gym Removed £30,000 
Project
removed due
to lack of
community
support 
Wishaw
Project Name   Project Details Status Budget Notes
Wishawhill
Pumptrack:
Socialtrack Project 
Environmental &
Woodland
improvements
around Wishawhill
Woods including
further development
of pump
track/cycling facilities 
Under
Development
Third Party
Contribution
TBC +
Potential of
up to
£100,000
funding
from Sports
Scotland
Facilities
Fund 
Idea being
developed in
partnership
with Social
Track and
Green Action
Trust. 
Meeting took
place with
proposer
awaiting
Page 59 of 108

Page 60

amended
proposal. 
Overtown solar
lighting on pathway
Built in Solar
Lighting on pathway
Under
development
£10,000 LDP Proposal
currently being
worked on with
local
organisation. 
Site visit to be
rescheduled.  
Cleland Parking Lack of parking at
Crossgates Ave,
Crosshill Dr & Fraser
St
Under
development
Indicative -
£20,000
Project idea
raised by local
community –
Site visit
completed.
Service checks
completed.
Detailed
design to now
be created.
Local
consultation to
be undertaken
Newmains
Community
Council MUGA 
Clarification on
project one survey
findings is received
Potential/ In
progress
£140,000   Site location
confirmed,
Projects team
to arrange
feasibility
checks
Location
confirmed with
the community
group on the
ash pitch.
Waverly Drive Play
Area 
Replacement and
upgrade of Waverley
Drive Play Area 
Potential/ In
progress
£100,000 
Procurement
concluded,
contract
awarded. 
Cambusnethan
Memorial Park
Play Area 
Replacement and
upgrade of Play
Area
Potential/ In
progress
£100,000 Procurement
concluded,
contract
awarded. 
Page 60 of 108

Page 61

Cleland Sydney
Devine Memorial 
Memorial Plaque for
Sydney Devine in his
town of birth. 
Potential/ In
progress
£4k to £5k CPO and
Projects Team
to have a
follow up
meeting to
discuss final
design 
Coltness Welcome
Sign 
Welcome Sign Potential/ In
progress
£20,000 Joint site visits
complete.
Consultation in
progress. CPO
to liaise with
proposers for a
final
consultation on
design.
CCTV Additional CCTV in
locality in
conjunction with
community safety
partners 
Potential/ In
progress
£25,000 
proposal is
under
development.
Community
Partnership
Initiatives
Funding to support
community
partnership
initiatives 
Potential/ In
progress
£10,000  
Newmains
Community
Council Village
Welcome 
Creation of welcome
sign
Potential/ In
progress
£20000 +
additional
costs of
£8,400 
Phase 1 of
project is
complete 
now onto
phase two. 
Initial design
complete,
awaiting
feedback from
contractors.  
Page 61 of 108

Page 62

Branchalwood
Estate, Coltness 
Environmental
improvements
Potential/ In
progress
£16,000 
Meeting
occurred
regarding the
details on the
Nature
signage.
Projects team
to discuss
number of
signages and
designs.
Nature sign
design to be
completed.   
Page 62 of 108

Page 63

Appendix 2
LDP allocation by Community Board area 2025/26-2028/29
Year Airdrie Bellshill Coatbridge Cumbernauld Kilsyth Motherwell Northern
Corridor
Shotts  Wishaw
2025/26 £278,051 £205,487 £239,094 £244,110 £58,352 £269,190 £121,386 £76,242 £178,568
2026/27 £269,137 £199,039 £226,740 £237,506 £56,546 £260,494 £127,953 £73,833 £172,947
2027/28 £236,643 £174,944 £199,297 £208,740 £49,700 £229,046 £103,305 £64,266 £152,011
2028/29 £266,973 £197,366 £224,840 £235,494 £56,069 £258,402 £116,545 £73,211 £171,494 
Page 63 of 108

Page 64

Appendix 3
Your community asked, we delivered:  
LDP project case study: Holytown Community Garden
This case study focuses on the development of a community garden in Holytown. The
case study sets out the background and process for the development and the delivery
of the project, which was completed in July 2025. 
Background
A proposal was received from local residents looking for funding and assistance to
develop a community garden on Holytown’s Main Street. 
Support was provided by the Community Partnership Team and Climate Action Towns.
Holytown Environmental Group formed in 2024 and led the local support and
progression of the project. 
Project Development
Engagement with local residents allowed for ideas and aspirations to be developed to
improve a local underdeveloped green space in a central location. 
The aim of the project was to promote social interaction, mental and physical wellbeing,
improving quality of life and building a stronger sense of community. 
During the development phase and since the completion of the project, there has been
positive feedback received from residents, local elected members, and local business.
Many have commented that the area has been vastly improved, “it’s beautiful and very
picturesque.” 
The Community Partnership Officer is currently liaising with Holytown Environmental
group to organise an official opening of the new community garden. 
The completion of the project has been highlighted on the council website:
Holytown Community Garden | North Lanarkshire Council  
Page 64 of 108

Page 65

Images 1 and 2: Site for Holytown Community Garden 
Images 3 to 6: Development of garden area   
Page 65 of 108

Page 66

Images 7 to 11: Project Completion 
Page 66 of 108

Page 67

LDP project case study: Lochside play area, Gartcosh. 
The focus for this latest Northern Corridor case study is the creation of the new play area at
Lochside, Gartcosh. The case study sets out the background and process for the
development and delivery of the project, which was officially opened in April 2025.
Background
The previous play facility was in poor condition, needing refurbished to enhance local play
provision in the Gartcosh area. Local people, including young people asked if an upgrade
was possible. With site feasibility checks carried out and completed, the Community
Partnership Team carried out consultations with pupils from local schools and sent a
neighbourhood survey to residents in Blades Court and Lochside.
Consultation
Consultation sessions with pupils from St. Barbara’s and Gartcosh Primary Schools
confirmed the children’s desire for an upgraded facility, with young people also identifying the
types of equipment they would like to include, such as swings and a slide. Funding for the
project came from the Council’s Local Development Programme and the Scottish
Government’s Play Park Renewal fund.
Image 1: Lochside play area opening. 
Images 2: Official opening 
The play area was officially opened on 30 April 2025, attended by young people from both
primary schools and residents. The children had a fantastic day playing together whilst trying
Page 67 of 108

Page 68

out the new play equipment. 
Image 3:  Design-a-Sign competition 
Designed by Kompan, the facility offers different types of play opportunities, with children
giving their approval for well used community resource. 
Page 68 of 108

Page 69

LDP Case study: Overton Outdoor Gym
Summary
Overton outdoor gym was developed through working closely with local community
organisations such as the Overton Brighter Village Association and he Overton and Waterloo
Community Council. The project was funded through the Local Development Programme
and had a budget of £45,000. 
Background
The Community Partnership Officer (CPO) form the Council’s Community Partnership Team,
worked closely with the Overtown Brighter Village Group on the design of the outdoor gym
and the requests for specific equipment that would be accessible to older people and those
with mobility issues as this was the community’s goal.  The local schools at Orchard Primary
and Clyde Valley High were involved in consultation. 
Project delivery
The new outdoor gym sits within the Overtown Community Park, providing other facilities
including a play area, skate park and designated dog walking area, now boasting the brand-
new gym. The facility includes twelve different pieces high tech durable exercise equipment
including a spinning bike, elliptical trainer, hydraulic squat, chest press, pendulum & twister,
abs bench and more. The gym is installed on state-of-the-art wet pour surfacing for safer
training, and colourful zones. 
The gym was designed with the purpose of attracting all ages from the local community to
improve their mental and physical health and wellbeing The majority of the equipment is
designed to be accessed and utilised by those with poor mobility and low strength as well as
those at the other end of the fitness spectrum.
Children and young people from Orchard Primary and Clyde Valley High schools were
invited to celebrate the official opening on 13th June 24. The park was officially opened by the
Chair of the Overtown Brighter Village Group. The sign for the gym incorporates the logo for
the group. They are very proud of their work to establish this useful facility for the community. 
The images below show the completed outdoor gym and the official opening. 
Page 69 of 108

Page 70

Image 1: Overton Outdoor Gym 
Image 2: Official Opening of the Outdoor Gym 
Page 70 of 108

Page 71

Appendix 4
Play Area Development Update 2025/26
Community
Board
Project Name Project
Description
Project
Potential
Cost
Additional
external or
partner funding
available
Additional Notes
Phase 1     
Airdrie Caldercruix
play area
Play area
renewal 
TBC Scottish
Government Play
Areas renewal
funding available
to support the
project
Airdrie Petersburn play
area
Play area
renewal 
TBC Scottish
Government Play
Areas renewal
funding available
to support the
project
Coatbridge Bargeddie Play
area
Play area
renewal 
TBC Scottish
Government Play
Areas renewal
funding available
to support the
project
Coatbridge Greenend play
area
Play area
renewal
£100,000 TBC Scottish
Government Play
Areas renewal
funding available
to support the
project
Kilsyth and
villages 
Rennie Road
play area
Play area
renewal 
TBC Scottish
Government Play
Areas renewal
funding available
to support the
project
Motherwell Forgewood
play area
Play area
renewal 
TBC Scottish
Government Play
Areas renewal
funding available
to support the
project
Motherwell Jerviston Play
area
Play area
renewal 
TBC Scottish
Government Play
Areas renewal
funding available
to support the
project
Northern
Corridor
Eastfield play
area
Play area
renewal
£100,000 TBC Scottish
Government Play
Areas renewal
funding available
Page 71 of 108

Page 72

to support the
project
Northern
Corridor
Moodiesburn
play area
Play area
renewal 
TBC Scottish
Government Play
Areas renewal
funding available
to support the
project
Wishaw Cambusnethan
play area
Play area
renewal 
TBC Scottish
Government Play
Areas renewal
funding available
to support the
project
Wishaw Waverley Park
play area
Play area
renewal 
TBC Scottish
Government Play
Areas renewal
funding available
to support the
project
Phase 2     
Airdrie Caldercruix
Wheeled
Sports
Installation of
a wheeled
sports facility 
£50,000  
Bellshill  Holytown play
area
Play area
renewal
TBC  Scottish
Government Play
Areas renewal
funding available
to support the
project
Bellshill Mossend play
area
Play area
renewal
TBC  Scottish
Government Play
Areas renewal
funding available
to support the
project
Bellshill Clay Crescent
MUGA and play
area
Multi-Use
Games Area
£160,000  
Coatbridge Bargeddie
MUGA
New MUGA
facility
£90,000 TBC 
Cumbernauld Allanfauld
Road Seafar
play area
Replacement
play area
TBC  
Kilsyth and
villages
Hillside Park
play area
Play area
renewal
TBC  Scottish
Government Play
Areas renewal
funding available
to support the
project
Kilsyth and
villages
Colzium Park
play area
Play area
renewal
TBC  Scottish
Government Play
Areas renewal
funding available
to support the
project
Page 72 of 108

Page 73

Kilsyth and
villages
MUGA Old Mill
View
Play area
renewal
TBC  Scottish
Government Play
Areas renewal
funding available
to support the
project
Motherwell Glenmore Road
Outdoor Gym
New outdoor
gym
£40,000  
Motherwell Duchess Park
play area
Play area
renewal
TBC  Scottish
Government Play
Areas renewal
funding available
to support the
project
Northern
Corridor
Village Park
play area
Play area
renewal
£50,000 TBC Scottish
Government Play
Areas renewal
funding available
to support the
project
Northern
Corridor
Bluebell Park,
Stepps
Play area
renewal
TBC  Scottish
Government Play
Areas renewal
funding available
to support the
project 
Page 73 of 108

Page 74

Page 74 of 108

Page 75

North Lanarkshire Council
Report
Communities Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    SP/MC Date 27/10/25 
Community Boards and Partnership Communications Strategy 
From  Stephen Penman, Chief Officer (Strategy and Engagement)  
E-mail penmanste@northland.gov.uk 
costellom@northlan.gov.uk  Telephone 07725 289559 
Executive Summary
This report provides an update on key progress linked to supporting the development of
the Community Boards model including updates on Cycle 3, 2025 Community Board
meetings that took place throughout August/September 2025. 
• progress with the delivery of the nine Local Outcome Improvement Plans (LOIPs) and
the implementation of an associated Monitoring and Management Framework and
Partnership delivery approach 
• Progress with the Community Board Development Programme 
• Work to commence development of a Partnership Communications Strategy
• Continued development of a Partnership Communications Strategy
• The planning, delivery and feedback from the Community Board Conference 
As previously agreed by committee, reports on the work of the nine Community Boards are
provided to the committee relating to each committee cycle. Progress is also reported to
the North Lanarkshire Community Planning Partnership Strategic Leadership Board to
reflect the statutory nature of the Boards in Community Planning terms in providing local
governance for the Local Outcome Improvement Plans. This report covers Cycle 3, 2025
Community Board meetings. 
The process and focus of reporting on the work of the Community Boards will continue to
be reviewed and elements included within the Local Outcome Improvement Plan
monitoring and management framework.
Recommendations
It is recommended that the Communities Committee: 
(1)  Recognises work to continue to develop and improve the integrated approach to
supporting the local Community Board model. 
The Plan for North Lanarkshire
Priority  Enhance participation, capacity, and empowerment across our
communities
Ambition statement (20) Improve the involvement of communities in the decisions,
and development of services and supports, that affect them
Programme of Work All Programmes of Work
Item 4
Page 75 of 108

Page 76

1. Background 
1.1 Community Matters - A Framework for Working with Communities set out the
Community Planning Partnership’s commitment to engaging with communities
underpinned by a set of principles and approaches designed to deliver on key priorities
associated with working with communities which included the creation of Community
Boards. The framework was approved by the Policy & Strategy Committee at its
meeting on 19 March 2020. 
1.2 The Community Boards are integral to supporting community participation and
providing a single coordinated approach to governance for local communities, reflecting
statutory and regulatory requirements. The Boards continue to develop in a manner
consistent with influencing and delivering the Plan for North Lanarkshire outcomes at
local level. This is being driven through the Local Outcome Improvement Plans (LOIPs)
for each of the nine areas, ensuring a partnership focus on supporting service design,
delivery and community action reflecting both the ambitions within The Plan for North
Lanarkshire and the priorities and circumstances of individual areas. The LOIPs are
published on the North Lanarkshire Council website and were circulated to all
Community Boards.   
1.3 The monitoring and management framework for the delivery of the LOIPs is in place
and operational along with supporting partnership delivery approach through the
establishment of Local Partnership Teams. This is being used to inform reporting to
Committee, the North Lanarkshire Partnership (NLP) Strategic Leadership Board and
individual Community Boards. A separate LOIP update is provided to the Communities
Committee and the NLP Strategic Leadership Board on a 6 monthly basis providing a
snapshot of highlights and future priorities for each of the board areas and a detailed
progress report is submitted to each of the 9 Community Boards annually. 
1.4 Cycle 3, 2025 Board meetings have now taken place, and an example of an agenda is
included in Appendix 1. 
Table 1 – Cycle 3,2025 Community Board Meetings 
Area Meeting Date & Time Location
Shotts 19/08/2025 at 6:30pm Allanton Community Centre
Northern Corridor 20/08/2025 at 7:00pm Chryston Parish Church
Coatbridge 21/08/2025 at 6:30pm Riverbank Community Hub
Cumbernauld 26/08/2025 at 6:30pm Pollock Hall, Condorrat
Kilsyth & Villages 27/08/2025 at 6:30pm St. Patrick’s Primary School
Wishaw 28/08/2025 at 6:30pm Newmains and St Brigid’s Community
Hub
Airdrie 03/09/2025 at 6:30pm Chapelhall Library
Bellshill 04/09/2025 at 6:30pm Burnhead Parish Church
Motherwell 09/09/2025 at 6:30pm Watersports Centre, Strathclyde
Country Park
Page 76 of 108

Page 77

2. Report 
Community Boards – Cycle 3, 2025 
Representation at Community Board Meetings 
2.1 At this cycle of Community Board meetings, attendance reflected a good mixture of
partners, elected members, community groups and local people at all Board meetings.
Approximately 223 people attended this cycle although this was a slight decrease since
the previous cycle of meetings there was an increase the number of Community
representatives in attendance. There were 72 community organisations represented,
with 98 community representatives and 15 individual local people in attendance at
meetings. 
2.2 A broader range of community representation is generally in evidence at Community
Board meetings with 11 new organisations attending this cycle of Community Boards. 
2.3 The categories of participants in Cycle 3, 2025 Community Boards are as set out in
Table 2 below: 
Table 2 - Participants (Cycle 3, 2025) 
Participants at Community Boards (Cycle 2, 2025)
Community Councils  Tenants and Residents Associations 
Historical/Cultural Groups  Community Forums 
MSYP/Youth Fora Police Scotland 
Scottish Fire & Rescue  NHS Lanarkshire 
Voluntary Action North Lanarkshire  NL Disability Forum
Elected Members  Council Officers
Local people/residents  Community Organisations 
African Collaborative Lanarkshire Deaf Services/ Lanarkshire
Deaf Hub 
Participation in meetings 
2.4 Work is continuing by all Community Planning Partners to encourage wider
representation at Community Board meetings. Meeting information is circulated across
social media channels including NLC website and MyTown pages four weeks in
advance of each meeting with additional promotion scheduled 1 week in advance and
on the day of the Board Meeting. Posters are also circulated to approximately 1300
Community Board members and local groups and organisations for wider local
circulation to Community Councils and Tenants and Residents Associations and wider
networks to raise awareness about Community Board meetings. All Community
Planning Partners, Elected Members, and Board members have responsibility for
encouraging wider participation at Board meetings and for using information from wider
Page 77 of 108

Page 78

engagement activity through LOIP subgroups and community networks to represent
the views of the wider community as appropriate. 
2.5 There was a slight decrease in the overall number of people attending Community
Boards in this cycle, although there was an increase in the number of Community
representatives in comparison to the previous cycle in May/June 2025. 18 Community
Council’s and Tenants and Residents Associations attended this cycle of Board
meetings. 
Agenda items 
2.6 During this cycle, seven out of nine Community Boards had agenda items put forward
by community groups and organisations in advance of Board meetings. Examples of
Agenda items put forward included, Gartcosh Crime Campus, Parking Issues, public
transport and Pivot Centre refurbishment in the Northern Corridor; Community Board
Conference, Flood Prevention, Dumbreck Nature Reserve in Kilsyth and Villages; Town
Centre Development, Carbrain Community Events and Anam Alba in Cumbernauld,
Townhead projects and Shine-on project at Coatbridge; Anti-social Behaviour at
Hartwood Hospital and cleaning of Motorway Services access bridge at Shotts; Quad
bike issues in Airdrie, Communication issues regarding major roadworks at Wishaw. 
2.7 In addition to the agenda items above, local community groups provided updates at
some Boards including Carbrain Community Events, Cornerstone House and Anam
Alba in Cumbernauld, Kilsyth Old People’s welfare, Rennie and Northfield Tenants and
Residents and Queenzieburn Hall at Kilsyth and Villages Board, Moodiesburn
Community Action Group at Northern Corridor Board, Chapelhall Development Group
at Airdrie Board, Cliftonville and Coatdyke Community Group at Coatbridge Board;
Newmains Community Trust and Social Track – Heritage Trail at Wishaw Board and
Viewpark Conservation Group at Bellshill Board. An example copy of an agenda can
be found in Appendix 1. 
2.8 Council Officers were also asked to attend or provide updates to Board meetings in
response to agenda items and issues raised by community representatives. Council
and Community Planning Partnership Partners will continue to be invited to attend in
relation to specific agenda items raised. External organisations are also invited to
attend Board meetings in response to agenda items raised by communities as
required. In this cycle, the Project Development Manager responsible for the Town
Centre Development was asked to attend the Cumbernauld Community Board; NLC
Parking Manager attended Bellshill Community Board to provide an update on Town
Traffic Management plans and the Project Development Manager provided an update
on the Town Centre Plans at Cumbernauld. 
Opportunities to provide updates and share views. 
2.9 As previously reported, all nine Community Boards endorsed Local Outcome
Improvement Plans (LOIPs) which have been published and can be accessed via this
link. Community Board agendas are now organised around LOIP priorities and updates
from communities and partner agencies are linked to priorities where possible to ensure
clear focus on progress towards achieving actions to address the key priorities that
were identified by local communities. Local people can also raise ad hoc issues or
share local information through the Community Matters section of the agenda. 
2.10 Positive progress continues to be made with subgroups meeting to progress agreed
actions to address local priorities where this is the most appropriate mechanism. Work
Page 78 of 108

Page 79

is ongoing and meetings are taking place and scheduled with local community groups
and organisations to further develop subgroups. 
2.11 Following on from the Community Board Self Evaluation Workshops that were carried
out throughout November/December 2024, Community Board Chairs participated in a
working group to develop the Community Board Conference that took place in Cairnlea
Church, Airdrie on Saturday 17th May 2025. 
2.12 All feedback from the conference has been collated and will be considered on a Board
basis to identify and agree further actions. Meetings will take place with Board Chairs
and Partners in September 2025 to review areas for consideration that were identified
through the feedback provided by participants. 
Special Board Meetings 
2.13 A Special Board Meeting was requested by Bellshill Community Board and took place
on 3rd July in response to community concerns in relation to access to Local GP and
NHS services. The meeting was chaired by NHS with representatives from District
Nursing, Urgent Care, Integrated rehab and Mental Health. 21 people attended and
feedback received was positive. 
Community Board Local Development Programme (LDP) Projects 
2.14 As previously reported, community organisations requested a positional statement
regarding outstanding Local Development Programme projects. The LDP report,
continues to be split by Community Board area, and detailing the status of projects,
was circulated in advance of cycle 3, 2025 Board Meetings. The project proposal form
identified in previous reports to committee, continues to be utilised to record LDP
project ideas and suggestions put forward from local communities. LDP continues to
be a set item on the agenda at all Community Board meetings and is subject to a
separate report to this committee. 
Involving Communities 
2.15 This cycle of meetings saw continued involvement of seldom heard voices in
Community Board meetings. The Community Partnership team will continue as a
priority to proactively work with local community groups and people with lived
experience to support this objective. 
2.16 Members of Lanarkshire Deaf club, Deaf Services Lanarkshire, NL Disability Forum,
Cumbernauld Action for Care of the Elderly, Allanton Senior Citizen’s group, African
Collaborative and North Lanarkshire Carers Together attended Community Board
meetings this cycle. 
2.17 Work is ongoing with youth groups to encourage them to provide a presentation/ update
to Community Boards in Community Board areas. At this cycle of meetings, 9 young
people attended Community Boards during this cycle, 1 young person represented
Youth Action Cumbernauld and Kilsyth attended Kilsyth and Villages Community Board
Meeting and 8 young people attended the Airdrie Community Board. 
2.18 A range of engagement and consultation opportunities have taken place with young
people between April/May and August/September Board Meetings demonstrating a
strong commitment to involving young people in shaping their community and
addressing issues that matter to them. A report on youth engagement and consultation
activity that has taken place with young people through Community Boards, Local
Page 79 of 108

Page 80

Development Programme projects and Local Outcome Improvement plans across NLC
has been submitted separately to Committee. 
Our Lives – An exploration of the lived experiences of North Lanarkshire’s 
2.19 Black, Asian, and other Minority Ethnic People 
2.20 Community Planning Partner organisations continue to progress the work associated
with the recommendations set out in the Our Lives Research. 
2.21 A presentation was provided to the April meeting of the Strategic Leadership Board
detailing the significant progress that has been since June 2024 in the areas of: Digital
/ IT Skills and Support; Employment Skills and Training; Language Support and Skills;
Cultural Awareness and Celebration; and Safety and Security. 
2.22 The next steps for this work approved by the Strategic Leadership Board are to: 
• Continue to support the establishment and sustainability of the Cultural Committee
for North Lanarkshire
• Utilise the opportunities provided through the ESOL Chat cafes, the Cultural
Committee and the New Scots Integration Network to continue to build effective
partnerships and 
• Plan, develop and host, in partnership with our Black and Minority Ethnic
communities a conference to marks two years since the research was published.
This is being planned to take place in October 2025. 
Moving Forward 
2.23 Community Board Chairs 
2.24 At this cycle, all nine Community Board meetings were chaired by Community
representatives. 
Community Board Development Programme 
2.25 The Talent and Organisational Development team is currently collaborating with
colleagues from the Community Partnership team to plan, design, and implement a
new Community Board Induction area within the hub. The key topics for this area have
been identified with a view to involving Community Board Chairs in the creation of
introductory video resources. 
2.26 Since the previous update, the hub has been accessed by 77 of the 131 identified
audience members, with the most recent recorded activity taking place on July 2025. 
The Role of Chief Officers as Community Coordinators 
2.27 As previously reported, Community Coordinators are in place and attending their
designated Community Board Meetings. Community Coordinator updates continue to
be included as a standing item on all Community Board agendas as well as participation
in discussion relating to a range of local matters. Community Coordinators meet with
key senior partners between Board cycles to discuss common matters, any leadership
action required, and to collectively consider input to future meetings. 
Page 80 of 108

Page 81

Future Board Meetings 
2.28 The next cycle of Community Board meetings will be held in November/December
2025. Following consultation with community group representatives and elected
members who attend Community Boards, it was identified that most Boards preferred
a mix of online and face-to-face meetings moving forward and during this cycle, all nine
Board meetings took place face-to-face in Community Facilities. 
2.29 Cycle 4, 2025 meeting dates are set out in Table 3 below. 
Table 3 – Community Board Meeting Dates (Cycle 4, 2025) 
Community Board  Day Date
Shotts Tuesday 18/11/2025
Northern Corridor Wednesday 19/11/2025
Coatbridge Thursday 20/11/2025
Cumbernauld Tuesday 25/11/2025
Kilsyth & Villages Wednesday 26/11/2025
Wishaw Thursday 27/11/2025
Airdrie Wednesday 03/12/2025
Bellshill Thursday 04/12/2025
Motherwell Tuesday 09/12/2025 
Local Outcome Improvement Plans – Partnership Delivery, Monitoring, and
Management Framework 
2.30  As previously reported, the online LOIP monitoring, and evaluation framework is in
place. This management tool is being used by community planning partners to ensure
that progress towards addressing key priorities that were agreed with local communities
is monitored, recorded, and reported. 
3. Measures of success 
3.1 Delivery of LOIP outcomes and increased levels of engagement with local communities
and partners, resulting in generally positive impacts on communities across a variety
of priorities and key issues identified through effective locality planning and the
implementation of the Community Boards, particularly in areas where further
consultation has been required. 
4. Supporting documentation 
4.1 Appendix 1  Example of Cycle 3, 2025 Community Board Agenda. 
Stephen Penman
Chief Officer (Strategy and Engagement) 
Page 81 of 108

Page 82

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 82 of 108

Page 83

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Youth groups and organisations are involved in Community Boards providing
presentations and other inputs, they also contribute to development of Local
Outcome Improvement Plans 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 83 of 108

Page 84

Appendix 1
Community Board Agenda (Cycle 3, 2025)     
AGENDA (example)  
1. Welcome and Introduction: 
• NHSL to record the minutes of Board meetings (Subject to local 
changes). 
2. Apologies 
3. Minute of previous meeting and matters arising 
4. Local priorities Local Outcome Improvement Plan (LOIP) updates: 
• LOIP Review update
• Local priorities for each Community Board Area
• Local partner updates from Police Scotland and Scottish Fire & Rescue
Service, NHSL, VANL related to LOIP priorities.   
5. Community Matters 
• Agenda items put forward by local people 
6. Local engagement/investment   
• Local engagement/consultation 
• Funding opportunities  
o Grant Award Programme scoring panel and Community
Empowerment NL 
7. Standing agenda items 
• Community Coordinator update
• Local Development Programme (LDP) update 
8. AOCB 
9. Date and time of next meeting. 
Page 84 of 108

Page 85

North Lanarkshire Council
Report
Communities Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    LR/HL Date 27/10/25 
Active & Creative Communities – Update on Performance 
From  Lyall Rennie, Chief Officer (Community Operations)  
E-mail liddleh@northlan.gov.uk Telephone 07976 726496 
1. Background 
1.1 In January 2020, a decision was made by the Policy & Strategy Committee to insource
services previously delivered by CLNL back to North Lanarkshire Council.  The new
service, ultimately to be known as Active & Creative Communities, was made up of
approximately 671 FTE from sport and leisure, libraries, museums and creative arts
and venues.  In June 2022, ACC was expanded with the addition of Active Schools and
Executive Summary 
Active & Creative Communities (ACC) was established on 1 April 2021 as a new service
created following the insourcing of Culture and Leisure North Lanarkshire (CLNL).  The
service comprises of Active NL, Community Libraries, Museums and Collections, and
Creative Assets and Resources.  Active Schools and Outdoor Education joined ACC from
Education & Families in June 2022. 
This report provides an update on overall performance in line with both the Programme of
Work and the overall Plan for North Lanarkshire. 
Recommendations
It is recommended that the Communities Committee: 
(1) Acknowledge the performance of Active & Creative Communities since its
establishment on 1 April 2021 and in support of the council’s ambition as set out in the
Plan for North Lanarkshire and the associated Programme of Work. 
(2) Otherwise, consider the contents of the report.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (15) Encourage the health and wellbeing of people through a
range of social, cultural, and leisure activities
Programme of Work All Programmes of Work
Item 6
Page 85 of 108

Page 86

Outdoor Education.  Sharing many of the same priorities has allowed for further
development of all services from this addition. 
1.2 The period of insourcing coincided with the start of the pandemic which saw all venues
close and many of those employees (plus additional casual employees) placed into
furlough support.  The launch of the new service within North Lanarkshire Council took
place on 1 April 2021, and a period of recovery and re-opening of services began in
earnest. 
1.3 This report outlines the overall direction of performance from that time in support of the
council’s ambitions under the Plan for North Lanarkshire Council. 
2. Report 
2.1       Very broadly, ACC works to three key ambitions under the Plan for North   
Lanarkshire: 
(1) Improve the health and wellbeing of our communities.
(2) Enhance participation, capacity and empowerment across our communities.
(3) Support all children and young people to realise their full potential. 
An initial key focus for the service was recognising that these ambitions touch on many
areas and other services within North Lanarkshire Council and our public partners.  A
priority for ACC was supporting a broader strategy for the council towards improved
wellbeing and tackling broader community challenges. 
Improve the health and wellbeing of our communities 
2.2 Members will be well aware of North Lanarkshire’s health challenges.    
• Our population is getting older, with latest results showing significant projected rises
in both those above pensionable age in general and over 75 years of age in
particular.
• Comparisons of census data from 2011 to 2022 for North Lanarkshire Council show
an average 25% increase in North Lanarkshire in residents who describe
themselves as being “not in good health”.  An average increase of 163.7% of
residents describe their mental health as “poor”.
• Higher than average levels of obesity.
• Lower than average fruit and vegetable consumption.
• In July 2025, the National Records of Scotland found that those living in North
Lanarkshire have the lowest healthy life expectancy in the country according to
official data – 52.5 years for women, 52.4 years for men. 
2.3 In the context of these challenges, it is critical that our services are tailored to meet
these needs.  While this can be difficult in the current environment where resources are
stretched, much has been achieved: 
• Direct participation in sports and leisure services has increased by 279% since
services re-opened following pandemic closures, with our membership rising from
12029 in 2021 to 45,611 in 2025.
• Our award winning Active 60 programme, introduced in 2021, offers discounted gym
membership for customers aged 60 and over.  This initiative has increased our
membership in this age group from 1263 to 9679 active members – an increase of
666%.
Page 86 of 108

Page 87

• The Active Teen programme, initially offered as free and now £5 per month, offers
discounted rates to those aged 11-15 years old.  This programme has increased
teen membership from 256 to 2916 active members – an increase of 1039%.
• We delivered over 30,000 fitness sessions during 2024/25 with participation from
over 418,000 members.  A further 600 personalised assessments are delivered
every week in Active NL gyms.
• Our Active Health programme, delivered in conjunction with NHS Lanarkshire, has
grown significantly over the last four years.  We now run a series of specialist health
programmes - cancers/stroke/frailty, falls, heart conditions, respiratory issues, MS,
Parkinson's, Dementia etc & general active health referrals.  We have increased
from support to 3254 people in 2021 to 8400 in 2024/25 – an increase of 158%.
• Our Weigh to Go programme provides a range of specialised courses delivered in
partnership with the Lanarkshire Weight Management Services from 11 in 2021 to
26 in 2024/25 addressing health issues attached to overweight/obesity/diabetes
management.
• A new initiative in 2024/25 was the launch of Musculo-Skeletal Community
Appointment days in partnership with the Allied Health Professionals Team from
NHSL.  This provides capacity for over 500 patients per event to attend for an MSK
appointment within NLC Sports Facilities. Three events during 2024/25 attracted
over 1200 patients.
• Our Community Sports Hub, funded by sportscotland, is a collective of local sports
clubs & other community organisations that come together to improve the
contribution that sport & physical activity has on a community. We are currently
working with 11 groups who were inactive in sports to now being active. These
groups bring together over 24 partners to create opportunities. 
2.4 The overall position of health in North Lanarkshire demonstrates that the impact of poor
mental health is a priority for many residents.  The impact of physical activity on mental
health is well known - regular exercise can help reduce symptoms of anxiety and
depression, improve self-esteem, and enhance overall life satisfaction.  However, for
many people, the opportunity to access events which take a different approach is their
preference.  Mental health can be improved by participating in events which promote
learning, provide opportunities to engage in creative activity and bring people together.   
• Museums worked with older residents in the community who wanted to share
memories of Speedway in Lanarkshire. A reminiscence group was established
and through co-working a series of public events and exhibitions has taken
place over the past 10 years. The group have also fundraised to provide
Summerlee with a portable AED.
• The Visual Arts team has worked to improve access to the arts for a wider range
of people and to use the arts as a vehicle for bringing local people together.
This includes affordable classes for adults and children, including those with
ASN creating a place for friendship and support to flourish whilst learning new
skills.
• The Arts Development team promote health and wellbeing through engaging
and inclusive activities. This includes collaborating with private dance schools,
Active School colleagues, and Cumbernauld Theatre Trust partners to deliver
enriching cultural experiences. These initiatives often take the form of dance
displays and performances in professional settings, serving both as an incentive
and the culmination of a year-long practice and dedication by participants.
• Arts Development has successfully contributed to the wellbeing and resilience
of our communities by delivering a diverse range of social, cultural, and leisure
activities that promote health and inclusion. Through targeted engagement with
Page 87 of 108

Page 88

children, young people, parents, carers, and families, we continue to support
the development of skills, confidence, and creativity. 
Enhance participation, capacity and empowerment across our communities 
2.5 The vision for North Lanarkshire requires an understanding of the broad range of
challenges that exist and the need for a cohesive and shared commitment.  Much has
been achieved by working with colleagues, internally and externally to achieve a
number of key benefits. 
• We engaged with University of Edinburgh and applied for Arts Humanities &
Research Council Place Based funding to undertake a collaborative place-
based knowledge exchange. This successful application resulted in delivering
Art Is Everywhere in 2022.  Art is Everywhere enabled Arts Development to
connect with other council departments and build stronger working
relationships. It enabled us to deliver a range of creative projects and engage
with communities we hadn’t worked with before. This allowed us to look at our
practices and challenge the status quo ensuring the projects and programmes
we offer engage the diverse communities of North Lanarkshire.
• Creating opportunities for artists in North Lanarkshire is a strand of work that
has had recent success including A Fragile Correspondence which saw
Ravenscraig and Lanarkshire Artists Frank McElhinney and Hamshya
Rajkumar represent Scotland at the 18th Venice Architecture Biennale.
• We continue to work with New Scots, and those connected with Justice
Services. 
• Our work to date has enabled us to build stronger relationships with NHS Health
Improvement and we are in the process of developing Creative Health
Awareness Sessions that will use a resource co-designed by Arts Development,
Freelance Artists and Community members called Building Blocks for Creative
Ideas. 
• We are currently exploring an accreditation opportunity with partners at New
College Lanarkshire to give people with lived experience of varying health
inequalities the opportunity to become Story Collectors linked to our podcast.
Another example of partnership working to benefit our communities.
• The council received funding from the National Lottery Heritage Fund to support
the creation of a Heritage Outreach Officer post linked to a four-year project –
Your Heritage in Focus.  The new postholder supports heritage projects across
North Lanarkshire communities, working to develop and build a network of
interested groups, investing in groups by supporting training and assisting them
in their individual goals.  Recent work includes partnership with the coal
communities to create new heritage walks celebrating the history of Stepps,
Gartcosh, Coatbridge, Salsburgh and Overtown. Online trails including points
of interest, photos, audio clips and historic maps are currently being produced
and will be uploaded by the end of the year. Surprising artefacts and anecdotes
have been revealed including: Stepps- The Mount Harriet Gatepost; the story
of Chapman’s Pub in Gartcosh; and The Ghost Riders of Gartsherrie! The
online trails will be the first step to digitise existing heritage village trails and
local heritage for wider access and promotion
• The Arts Development team supported council colleagues and partner
organisations working with care experienced young people. Around 30
colleagues were invited to join us at Beetroot Studios in September 2023 to
record the song that was written by conference attendees in February. -
https://www.youtube.com/watch?v=WxsWqQXg0Zw
Page 88 of 108

Page 89

• The library service operates in partnership with a wide variety of services, and
this has been continued in the last 4 years since the move back into the council.
The service has a close working relationship with Routes to Work and a number
of RTW staff operate out of Motherwell and Coatbridge libraries on a regular
basis. Working with NHS Lanarkshire the service has set up a Near Me, GP
appointment service in Chapelhall Library, a Hearing Aid battery replacement
service in all the branch libraries across the authority and a good grief
counselling service in Bellshill Cultural Centre.
• Working in partnership with the Stepps Community Council and council
colleagues, the service reopened the co-designed Stepps library in 2024 after
a two-year closure while building works were completed in Stepps Primary
School.
• Continuing to support the broader community, the library service has entered
into two license to occupy arrangements with local community groups over the
past 4 years. You Are My Sunshine (YAMS) a suicide prevention charity based
in Newarthill agreed a license to occupy in 2022 that enables them to make use
of Newarthill library during the evenings when the library itself is closed. YAMS
operate a series of events and activities out of the library, in the evenings aimed
at young people including: one to one support sessions, craft and chat events,
counselling and relaxation therapy.
• Chapelhall Community Development Group entered into a license to occupy in
2024 that enables them to operate out of Chapelhall library three evenings and
one morning a week, when the library is closed. The group have run a wide
range of activities out of the library including gentle exercise classes, teen
evening events on a Monday including film shows, children’s craft events and
tea dances for elderly residents. All events have proven popular and ensured
the library building is utilised by the community, for the community, at times
when it would otherwise be closed.
• Our archives service operates from a number of locations across North
Lanarkshire.  In addition to holding records from the council, NHS and a number
of significant public bodies, the service offers an important link to the past,
recently achieving Accredited Archive Service status.  The award defines good
practice and agreed standards for archive services across the UK – North
Lanarkshire is one of only three local authorities in Scotland who currently hold
this award.
• Working with the Health & Social Care Partnership, the team receives funding
is to support the delivery of Sports Development Events by raising awareness
for Suicide Prevention. These events include an annual Football Tournament
along with 2 running events, NiteLite and Cumbernauld 10k. The aim is to use
these events to spread the message of Suicide Prevention, and the benefits
physical activity can have on positive mental health.
• Our Volunteer NL programme was established in May 2023 with support from
the UK Shared Prosperity Fund (UKSPF) and aims to provide support to help
expand volunteering opportunities across North Lanarkshire.  The project seeks
to engage volunteers to operate across a range of roles within North
Lanarkshire Council and offer wider support to volunteers operating in
community groups and sporting clubs across North Lanarkshire.   We have
since supported four people (including two ASN) into employment and engaged
with 15 national organisations to support delivery of community projects across
North Lanarkshire. 
Page 89 of 108

Page 90

Support all children and young people to realise their full potential 
2.6 Support for young people happens at all levels across ACC and we work closely with
partners to help make a difference. 
• In partnership with the Scottish Book Trust, we offer Bookbug across many of
our libraries and museums.  Bookbug is Scotland's universal early years book
gifting programme which supports families to read, sing, and play with their little
ones from birth to give them the best start in life.  During 2024/25, 6428 young
people attended at 2244 individual events.
• All libraries offer a range of special interest clubs for young people from coding
to gaming.  We work with local schools to provide such clubs within the school,
where the opportunity arises.
• ACC has one of the younger workforce establishments, and we are committed
to supporting all children and young people to realise their full potential by
providing meaningful opportunities that build confidence, develop transferrable
skills, and foster personal growth. Through a range of opportunities across all
services, including sports development, lifeguarding, operations, front-of-house
and bar recruitment, young people can gain valuable experience in
communication, teamwork, and practical workplace skills.  We regularly take a
number of placements across the year supporting council wide programmes,
with many of these young people being retained on the casual register.
• Our sports camps run through every school holiday period and offer young
people an opportunity to engage in a range of sports, dancing and performing
arts activities.  Participation in the sports camps has increased from14,255 in
2021 to 27,714 in 2025 to date – an increase of 94%.
• In a partnership between Education and Active & Creative Communities, a new
outdoor nursery is being set up in Summerlee Museum to provide access to
safe greenspace for all Coatbridge nursery classes.
• The AppleBox club for young filmmakers has seen some of the participants
move on to further education in filmmaking.
• The Tiny Tots Film Making project for early years a radical approach to digital
learning for under 5s and their carers.
• The Active Schools Programme provides extracurricular activity for all pupils in
North Lanarkshire Schools. This includes a weekly minimum of 4 extra-
curricular activities in Primary Schools and 10 in Secondary Schools.  Some
examples include:
o Linking with the Learning Support Unit, the team have delivered
leadership training to two young people at Glencryan school.  Over the
course of the academic year, they covered areas such as
communication, what makes a good leader and provided practical
examples in archery, boccia and fundamental skills.  
o Working with Hilltop Primary School’s LCSC unit during 2024, all pupils
in P6/7 were given the opportunity to become junior sport leaders.  Over
a four-week period they followed an amended programme, encouraging
and providing support for the young people to set up, explain the rules
and deliver to younger pupils.  
o In Woodlands Park High School, a lunch time football club for their pupils
has been established. Participating in this football project has allowed
pupils to exercise in a different way but also encourage them to work on
their social skills.
• North Lanarkshire Active Schools has delivered a vibrant and inclusive calendar
of events throughout 2024, engaging pupils across primary, secondary, and
ASN schools. With dedicated activity calendars for primary schools and an
Page 90 of 108

Page 91

enhanced secondary school sports programme featuring girls football,
handball, basketball, swimming and golf. Provision for pupils with additional
support needs has also been enhanced, with the sensory dance events
standing out as a particular highlight.
• The Active Schools team are committed to developing a broad range of sports
leadership opportunities for young people in North Lanarkshire. We are
passionate about giving young people meaningful experiences, skills and
qualifications that allow them to give back to their schools as young leaders in
sport. Our vision is to have a joined-up leadership pathway from P6 to S6 and
beyond, with appropriate support and training along the way for every young
person involved. This pathway is a flexible model that is adaptable to meet the
needs of all schools. The implementation of this pathway contributes to our key
aim of Developing Young People as Leaders in Sports as well as contributing
to the DYW agenda.
• In the 2024/25 academic year, North Lanarkshire Council's Outdoor Education
programme has welcomed pupils from across the authority, offering enriching
experiences that connect young people with the natural environment.  The
programme has also proudly supported 10 ASN schools, ensuring inclusive
access to outdoor learning.
Digital North Lanarkshire 
2.7 The team has supported the council’s ambition under the Digital them in a number of
ways: 
• Working with colleagues across the council, the service is currently piloting two
new digital zones in Coatbridge and Chryston libraries as part of the key
programme of work deliverable of implementing smart community hubs to
improve access to omni-channel digitally enabled services and experiences.
• As part of a wider council project, the service has supported the establishment
of three new Immersive Experience Rooms in Motherwell Library, Airdrie
Library and Summerlee.  Immersive rooms harness the power of digital media,
creating opportunities for communities, staff, and partners to support digital
skills development, health and wellbeing improvement, social skills
development, educational attainment, and pathways to future learning and
employment.   As part of the wider development of Motherwell Library (outlined
below), we established a digital hub. The digital hub incorporates the immersive
room, a new flexible learning space to enable group and one to one activities
to take place and the Letitia McKell Makerspace, a creative learning space
incorporating a range of digital and electronic equipment to help customers
create, repair and recycle, explore and learn.  Since the completion of the
upgraded building and development of the digital hub the service has seen a
25.9% increase in footfall, a 7% rise in active borrowers and a 17% rise in
membership. 
Transforming Places 
2.8 Under the broader theme of Transforming Places, the team has worked to invest in our
facilities and make improvements to services which support the council’s commitment
to place based investment programmes and activity to meet the needs of our
communities.  This can be challenging and must be carefully managed within the
restrictions of available budget, but much has been achieved: 
Page 91 of 108

Page 92

• Installation of 3G pitches in Bothwellhaugh, Keir Hardie, Broadwood, Cleland,
Hartill and Moodiesburn.  The last three with the support of Recover NL funding.
• Essential replacement of the Time Capsule Swimming Pool's movable floor
and complete renovation of the plantroom with upgrade of essential features.
• Library roof repairs, rewiring, and heating upgrades
• Improved drainage and lighting at Summerlee Museum of Scottish Industrial
Life
Improvement works at Colzium House
• Wishaw Swimming Pool boiler replacement
• Lift replacements
• Replacement of library windows
• Tryst Sports Centre Health Suite developments.
• Gym upgrades in Wishaw, Ravenscraig, Broadwood, Sir Matt Busby and Time
Capsule.  We will continue on a programme which sees all key sites upgraded
every three years.
• Our next priority project which is now underway is the repair of John Smith
Pool. 
2.9 Working with colleagues in the Place Team, we were successful in attracting
development funding for two key projects.  Subject to the achieving final funding, both
will bring significant funding to the council to transform North Lanarkshire.  
• The Rediscovering Airdrie project seeks to transform the sense of place in
Airdrie through investing £6m in town improvements such as historic building
repairs, shop fronts; creating a refurbished library for the next century which will
act as an accessible town centre hub and meeting place for the community; and
delivering a programme of events and activities to engender pride in the town.
• Summerlee: New Stories; New Audiences; Better Lives is in the development
phase of funding, aiming to achieve a £7m investment in Coatbridge to put the
community at the heart of the museum and town.  This will tell the more recent
story of North Lanarkshire through building a mining village, welfare hall and
other site wide improvements. 
Looking to the Future 
2.10 North Lanarkshire Council is committed to ensuring that the community has access to
a wide range of services to support their wellbeing and ensure they are able to engage
in activities that promote health and engagement.  We will continue to work with internal
and external partners to fulfil the council’s ambitions. 
3. Measures of success 
3.1 A robust and thriving service which provides a full range of social, cultural and leisure
activities in support of council ambition and in meeting community need.     
Page 92 of 108

Page 93

4.       Supporting documentation 
No supporting documentation. 
Lyall Rennie
Chief Officer (Community Operations) 
Page 93 of 108

Page 94

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 94 of 108

Page 95

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 95 of 108

Page 96

Page 96 of 108

Page 97

North Lanarkshire Council
Report
Communities Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    LR/HL/AH Date 27/10/25 
ACC and Community Facility Usage and Footfall Q2 25-26 and Q2
24-25 
From  Lyall Rennie, Chief Officer (Community Operations)  
Email Liddleh@northlan.gov.uk Telephone 07973 726496 
Executive Summary 
For the information of elected members, this report provides an overview of usage of a
range of sports, culture and leisure venues and our community facilities, comparing quarter
2 of 2025-26 and quarter 2 of 2024-25. 
Recommendations
It is recommended that Committee: 
(1) Acknowledges usage and footfall associated with the council’s sports, culture,
leisure and community facilities. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (24) Review and design services around people, communities,
and shared resources
Programme of Work Statutory / corporate / service requirement
Item 7
Page 97 of 108

Page 98

1. Background 
1.1 North Lanarkshire Council has made a commitment to ensure our residents have
access to a range of services and venues across the authority which support their ability
to maximise health and wellbeing and give access to areas where they are able to work
with others to participate in activities or take part in projects which seek to provide
overall community benefit.   
1.2 Within this context, the council has a range of venues provided by either Active and
Creative Communities or Community Facilities which are used by the community in a
range of different ways.  Some venues are better used than others and it is recognised
that people’s habits have changed, particularly in the period following the pandemic. 
1.3 In line with our commitment to ensure the best use of the limited resources we have,
usage of such facilities is closely monitored and presented within this report for the
information of elected members.   
2. Report 
2.1 Appendix One provides a breakdown of footfall during quarter 2 of 2024/25 as
compared to quarter 2 of 2025/2 for Active NL, Community Libraries, Creative
Resources and Venues and Museums.  Information for community facilities is gathered
in a different manner, recorded both by the number of bookings made (count) and the
duration of those bookings.   
2.2 Overall, there is a generally positive picture across Active & Creative Communities,
although all entertainment venues experienced a drop in attendance compared to the
previous year.  Ticket sales remain high so there is no cause for concern with
performance over the summer period at present.  In relation to the wider estate, we are
currently working on repairs to the John Smith Pool, as approved at the last meeting of
the Communities Committee and are soon to begin work on the health suite at Shotts
Leisure Centre. 
2.3 For community facilities, a significant period of Quarter 2 includes the summer break
during July and August when many users do not operate. While the figures show an
overall improvement this quarter, when the addition of usage information relating to
Stepps is taken into consideration, there has been a reduction in usage of 250 hours
in comparison to the same 3-month period in 2024/25. This reduction is during the
school holiday period of July and August, with an increase of 616 hours usage in
September. 
2.4 Some social media promotion was undertaken in May and June and further promotion
is planned towards the end of the year. The team will continue to monitor usage. 
2.5 The council continues to work with a range of local groups to support increased use of
our facilities wherever possible.  Work with the Community Ownership and
Management Group continues to support community interest in all forms of access
including community asset transfer where this approach supports the aspirations of
local groups. 
Page 98 of 108

Page 99

3. Measures of success 
3.1  A thriving and sustainable council service which supports the delivery of culture, sport,
leisure, and community facility services. 
4. Supporting documentation 
4.1       Appendix 1     Usage and Footfall Q2 2024/25 and Q2 2025/26.   
Lyall Rennie
Chief Officer (Community Operations) 
Page 99 of 108

Page 100

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 100 of 108

Page 101

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 101 of 108

Page 102

Usage and Footfall Q2 2024/25 and Q2 2025/26.                               Appendix 1 
Active NL 
2024-25 2025-26 % Q1
2025-26
Comment
Venues Q2 Q2 Movement 
Airdrie Leisure Centre 101497 107183 5.6% 87,966 
Aquatec 6509 8198 25.9% 9,462 
Birkenshaw Sports Centre 1505 679 -54.9% 534 
Broadwood Leisure Centre 156103 167094 7.0% 150,367 
Ian Nicolson Centre 17838 36106 102.4% 28,819 
John Smith Pool 20877 0 -100% 0 
Keir Hardie Centre 16136 23381 44.9% 17,623 
Kilsyth Swimming Pool 28487 29754 4.4% 22,866 
Lochview Golf Centre 24209 24500 1.2% 23,315 
Palacerigg Golf Course 12148 21180 74.3% 18,866 
Ravenscraig Sports Centre 156651 150049 -4.2% 157,541 
Shotts Leisure Centre 15991 24441 52.8% 15,135 Health suite closed from January 2025.
Sir Matt Busby Sports
Centre 108060 114079 5.6% 124,074 
Time Capsule 164138 147524 -10.1% 90,480 Waterpark closed until 28 July 2025.
Townhead 15388 23547 53.0% 15,417 
Tryst Sports Centre 169482 152188 -10.2% 190,940 
Wishaw Sports Centre 141215 150172 6.3% 131,814 
Total 1156234 1181214 2.2% 1,065,431 
Page 102 of 108

Page 103

Community Libraries 
24-25 25-26 %
Q1
2025-26  Comment
Libraries Q2 Q2 Movement 
Abronhill           5,891            6,770  14.9% 7,267 
Airdrie         15,400          16,537  7.4% 16,057 
Bellshill         16,178          15,448  -4.5% 15,541 
Chapelhall           3,726            4,230  13.5% 4,487 
Chryston           2,624            1,738  -33.8% 1,899 
Cleland           3,117            2,830  -9.2% 3,390 
Coatbridge         14,157          15,362  8.5% 13,558 
Condorrat           6,405            6,107  -4.7% 5,515 
Cumbernauld         16,424          15,760  -4.0% 16,101 
Kilsyth           5,377            6,784  26.2% 6,842 
Moodiesburn           3,408            4,141  21.5% 4,394 
Motherwell         23,197          24,476  5.5% 23,435 
New Stevenson           3,313            3,747  13.1% 3,462 
Newarthill           1,665            1,694  1.7% 1,464 
Newmains           4,570            3,438  -24.8% 3,397 
Shotts           2,090            2,568  22.9% 2,637 
Stepps           3,329            5,962  79.1% 7,048 
Viewpark           3,917            4,158  6.2% 4,123 
Wishaw         20,895          24,575  17.6% 26,796 
Total       155,683        166,325  6.8% 167,323 
Page 103 of 108

Page 104

Outreach Services 24-25 25-26 % Q1
2025-26  Comment  Q2 Q2 Movement
Outreach Van 319 573 79% 199 
Creative Venues 
Creative Venues 24-25 25-26 %
Q1
2025-26 
Q2 Q2 Movement  Comment
Airdrie Town Hall 8373 6897 -16.5% 14,814 
Bellshill Cultural
Centre 3664 2587 -29.4% 3,824 
Cumbernauld
Theatre 9812 8854 -9.8% 15398 
Total 21,849 18,428 -15.6% 34694 
Museums & Collections 
Museums 24-25 25-26 % Q1
2025-26  Q2 Q2 Movement Comment
Summerlee 49,654 57,494 15.8% 57,925 
NL Heritage Centre 4,959 5,865 18.2% 5,364 
Total 54,613 63,359 16% 63,289 
Page 104 of 108

Page 105

Community Facilities 
Facility
Centre
Status
(weeks)
24-25 Q2
Count
24-25 Q2
Duration
(hours)
25-26
Q2
Count
25-26 Q2
Duration
(hours)
Average Weekly
Hours in Q2
25/26 
Comments
Abronhill Community Facility 52 138 276 133 242 19 
Allanton Cc 52 46 126 50 128 10 
Andrew Hamilton Cc 38 26 86 27 86 9 
Antonine Community Sports 52 46 115 0 0 0 Centre now closed.
Auchinloch Cc 38 111 230 141 334 40 
Beechbank Cc 52 88 292 89 318 25 
Burngreen Cc 38 24 85 23 60 7 
Burnhead Cc 52 157 655 210 783 61 
Calderbank Cc 38 23 49 27 60 6 
Caldercruix Cc 38 14 34 4 11 1 
Chapelside Cc 52 535 1700 395 1228 95 
Charlotte Toal Cc 52 236 1010 263 1127 88 
Chryston Cultural Centre 52 216 565 146 368 29
Less functions have been booked over the
period.
Facility
Centre
Status
(weeks)
24-25 Q1
Count
24-25 Q1
Duration
(hours)
25-26
Q1
Count
25-26 Q1
Duration
(hours)
Average
Weekly Hours
in Q1 25/26 
Comments
Cleland Cc 38 14 40 24 58 6 
Coatbridge Cc 52 697 2452 1351 3323 260 
Coltness Cc 52 137 352 127 336 26 Reduction in use by CLD.
Cumbernauld New Town Hall 52 199 471 229 640 50 
Page 105 of 108

Page 106

Forge Cc 38 24 58 19 46 5 
Four Isles Cc 52 69 217 36 70 6 
Frank Ferguson Cc 52 84 326 83 335 26 
Garrell Vale Cc 52 247 725 180 476 37 Reduction in use by CLD.
Gartcosh Cc 52 159 499 167 488 38 
Facility
Centre
Status
(weeks)
24-25 Q1
Count
24-25 Q1
Duration
(hours)
25-26
Q1
Count
25-26 Q1
Duration
(hours)
Average Weekly
Hours in Q1
25/26 
Comments
Gartlea Cc 52 256 952 249 980 76 
Glenmavis Cc 38 12 44 0 0 0 Centre now closed.
Gowkthrapple Cc 38 19 79 24 56 6 
Greenfaulds Cc 52 101 272 95 254 20 
Harthill Cf 52 138 339 142 350 27 
Hattonrigg Cc 38 47 160 39 134 15 
Holytown Cf 38 92 265 101 249 28 
Isa Money Cc 52 114 315 135 340 26 
Jim Foley Cc 52 190 683 166 610 48 Reduction in use by NHS in September.
Joe McKay Cc 52 202 648 202 670 52 
John McCormack Cc 38 244 686 253 683 84 
MacAuley Cc 38 89 247 90 245 31 
Michael Sherry Cc 52 31 90 37 108 8 
Facility
Centre
Status
(weeks)
24-25 Q1
Count
24-25 Q1
Duration
(hours)
25-26
Q1
Count
25-26 Q1
Duration
(hours)
Average Weekly
Hours in Q1
25/26 
Comments
Mount Pleasant Cc 52 84 170 71 136 11 
Netherton Cc 38 22 53 24 52 5 
New Stevenston Cc 38 37 95 35 97 10 
Page 106 of 108

Page 107

Newarthill Cf 52 305 1087 324 1016 79 
Old Monkland C Wing 52 62 122 46 94 7 
Old Monkland Cc 38 102 246 114 284 33 
Overtown Cc 52 130 382 122 364 28 
Pat Cullinan Cc 52 325 1623 276 1188 93 
Pather Cc 52 272 871 264 887 69 
Pivot Cf 52 0 0 0 0 0 Closed due to RACC.
Plains Cc 52 56 149 40 128 10 
Pollock Cc 38 37 118 36 122 14 
Rochsoles Cc 38 16 43 0 0 0 Centre now closed.
Salsburgh Cc 38 63 144 97 192 23 
Facility
Centre
Status
(weeks)
24-25 Q1
Count
24-25 Q1
Duration
(hours)
25-26
Q1
Count
25-26 Q1
Duration
(hours)
Average Weekly
Hours in Q1
25/26 
Comments
Shawhead Cc 52 133 301 98 183 14
Boxing group now moved to alternative
premises.  CAT agreed for Shawhead CC
and in progress.
Shotts Cf 52 168 398 182 455 35 
Springfield Cc 52 45 132 76 169 13 
Stepps 52 0 0 256 667 52 
Tannochside Cc 52 108 298 120 316 25 
The Link 52 339 995 377 1113 87 
The Muirfield Centre 52 645 2262 666 2149 168 
The Village Cc 38 26 102 24 82 9 
Viewpark Cf 52 436 1184 493 1440 112 
Westfield Cc 38 37 127 53 134 16 
Totals  8273 26045 9051 26464  
Page 107 of 108

Page 108

Notes 
• School holiday periods tend to have lower usage.
• Term time sites are closed during the summer break.
• Use of term time sites during school holiday period reflects the number of weeks the sites are actually opened.
• Any usage shown during holidays in term time facilities related to agreed exceptions. 
Page 108 of 108