Page 1

24 August 2023 
Members of the 
Audit and Scrutiny Panel
Chief Executive’s Office
Archie Aitken
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk 
Notice is given that a Meeting of the Audit and Scrutiny Panel is to be held in the Committee Room 1, Civic Centre,
Windmillhill Street, Motherwell, ML1 1AB on Monday, 04 September 2023 at 13:00 PM which you are requested to attend. 
The agenda of business is attached. 
Archie Aitken
Chief Officer (Legal & Democratic) 
Members : 
Clerk Name: Andrew Rose
Clerk Telephone: 07951409714
Clerk Email: rosean@northlan.gov.uk
S Watson, H Dunbar, H Brannan-McVey, A Duffy-Lawson, T Fisher, M Hughes, J Hume, D Johnston, J Leckie, B
McCulloch, G Robinson,

Page 2

No embedded text on this page.

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical Standards In Public
Life Etc. (Scotland) Act 2000   
2 Compensation for Compulsory Purchase Order
Submit report by the Chief Officer (Place) providing information regarding the
latest report approved at the Housing Committee on 31 August 2022, whereby it
was agreed to write off historic Maintenance Order debts in order to support the
case for the Compulsory Purchase Order at Millcroft Road, Cumbernauld (copy
herewith) 
1 - 10 
3 Housing Refurbishments
Submit report by the Chief Officer (Housing Management) (1) updating the Panel
regarding the policy for adaptations including wet floors, and (2) addressing the
concern raised by the Panel at its meeting on 16 February 2023 in relation to the
installation of wet floor shower rooms for new tenants following fitting of a Capital
Programme bathroom at void stage (copy herewith) 
11 - 18  
AUDIT-RELATED ITEMS   
4(a)  Debt Recovery
Submit report by the Chief Officer (Finance) providing assurance that the Council
has adequate, robust and effective management arrangements in place for
ensuring that the management of debtors is appropriately and effectively controlled
(copy herewith) 
19 - 24 
4(b)  Equality Audit Progress
Submit report by the Chief Officer (People Resources) providing the Panel with an
update on progress made in relation to the audit carried out on the Council's
approach to managing its statutory equalities duties (copy herewith) 
25 - 40 
5 Audit and Risk-Related Items Action Log
Submit report by the Chief Officer (Audit and Risk) allowing Members to track
implementation of outstanding requests and recommendations made by the Panel
in respect of audit and risk-related items (copy herewith) 
41 - 44 
6 Internal Audit Progress Report
Submit report by the Chief Officer (Audit and Risk) (1) providing an overview of
Internal Audit activity, and (2) reporting the results of internal Audit outputs finalised
since the last update to the Panel in May 2023 (copy herewith) 
45 - 112 
7 Internal Audit Follow-Up of Actions previously agreed by
Management in responce to Audit Recommendations
Submit report by the Chief Officer (Audit and Procurement) updating the Panel on
the results of internal Audit's follow-up work reviewing the extent to which
management have implemented actions previously committed to in response to
previous Internal and External Audit recommendations (copy herewith) 
113 - 130 
8 Accounts Commission - Local Government in Scotland in Scotland
Overview 2023 report (May 2023)
Submit report by the Chief Officer (Audit and Risk presenting to the Panel the
contents of the Accounts Commission report 'Local Government in Scotland 2023'
which was published in May 2023 (copy herewith) 
131 - 136 
9 National Fraud Initiative Update
Submit report by the Chief Officer (Audit and Risk) (1) informing the Panel of the
progress made to date by the Council in response to the 2022 National Fraud
Initiative (NFI) data matching exercise, and (2) highlighting where further action is
required by the Council and/or relevant Services (copy herewith) 
137 - 142

Page 4

RISK-RELATED ITEMS   
10  Risk Management Update and 2023-24 Corporate Risk Register
Submit report by the Chief Officer (Audit and Risk) providing an update on key risk
management developments with a particular focus on the results of the recent
annual review of the corporate risk register, as well as providing the Panel for the
first time with a snapshot of the highest current residual risks within the Service
risk registers (copy herewith) 
143 - 158  
SCRUTINY-RELATED ITEMS   
11  Self-Evaluation of the Audit and Scrutiny Panel
Submit report by the Chief Officer (Legal and Democratic) providing the Panel with
an advance overview of the evaluation framework, process, and timetable for the
self-evaluation of the Audit and Scrutiny Panel (copy herewith) 
159 - 176 
12  Scrutiny Work Programme (Mid-Year Update)
Submit report by the Chief Officer (Business and Digital) providing a mid-year
update to the composite Scrutiny Work Programme and reporting timetable for the
scrutiny function of the Audit and Scrutiny Panel as set out in Appendix 3 to the
report (copy herewith) 
177 - 190 
13  Strategic Performance Framework - Performance Reporting
Schedule Quarterly Performance Assurance Review
Submit report by the Chief Officer (Business and Digital) providing the Panel with
the outcome from the performance assurance review that has been undertaken of
performance reports which have been submitted (in line with the Performance
Reporting Schedule) to Council Committees during Cycle 2 of 2023 (copy
herewith) 
191 - 216 
14  Arm’s Length External Organisations ALEOs Governance and Risk
Management Oversight and Assurance Report  2023 24
Submit report by the Chief Officer (Business and Digital) providing an overview of
the ALEO landscape and the performance and financial monitoring safeguards
that are in place to provide such assurance (copy herewith) 
217 - 240

Page 5

North Lanarkshire Council
Report
Audit and Scrutiny Panel 
Does this report require to be approved? ☐ Yes   ☒ No
Ref  NW/PH Date 31/08/23 
Compensation for Compulsory Purchase Order 
From  Pamela Humphries, Chief Officer (Place)  
E-mail wattsn@northlan.go.uk Telephone Neil Watts, 07583023239 
1. Background 
1.1 The Housing and Regeneration Committee in November 2021 approved the strategy
for the Council to progress the Compulsory Purchase Order (CPO) for acquisition of
168 flats, with subsequent demolition and provision of new build housing at Millcroft
Road, Cumbernauld. 
1.2 The CPO, if approved, will provide a unique opportunity to address the unacceptable
living conditions of many current residents who will be rehoused in higher quality homes
within a sustainable and healthy environment, and also radically improve the amenity
of the wider area for the benefit of the local community. The new development will
provide high quality, accessible housing within an attractive environment which will
include garden areas and outdoor space to significantly improve the quality of life for
residents and help meet housing need within the Cumbernauld area. The new
Executive Summary 
The report responds to the questions raised by the Audit and Scrutiny panel regarding
the latest report approved at the Housing Committee on 31st August 2022, whereby it was
agreed to write off historic Maintenance Order debts in order to support the case for the
Compulsory Purchase Order at Millcroft Road, Cumbernauld. 
Recommendations
It is recommended that the Audit and Scrutiny Panel: 
1) Note the contents of this report including the approvals that have been obtained in
previous committee reports. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (1) Ensure a housing mix that supports social inclusion and
economic growth
Item 2
Page 1 of 240

Page 6

development will also have a considerable impact on the surrounding area and
community by replacing the existing buildings which have fallen into disrepair with an
attractive new build development. The cost to the Council in arranging continuous fly
tipping uplifts/ clean-ups will be removed, as will the serious fire risk that the dumped
material presents within the closes, which is of on-going concern to the Fire service.   
1.3 In November 2021, the Housing Committee also agreed to the voluntary acquisition of
properties in advance of the CPO for those owner occupiers at Millcroft Road who were
interested in moving to the nearby new build development at Burns Road (which is
being delivered by Sanctuary (Scotland) Housing Association). Nineteen owner
occupiers have now successfully moved to Burns Road. 
1.4 As part of its case for the CPO, and as set out in the Statement of Reasons, the Council
must demonstrate that it is doing everything possible to support the re-housing of
residents affected by the CPO and help address the negative financial impact the CPO
may have on owners and residents. 
1.5 A number of properties still had Debts secured over them following enforced
Maintenance Orders that were carried out by the Council in 2011. The Debts require to
be addressed by the Council prior to submission of the CPO because the Council need
to carefully consider the impact of the CPO on affected parties and how that impact can
be mitigated, thus minimising risk of failure of the CPO itself. 
2. Report 
2.1 At the Housing Committee on 31st August 2022, it was agreed to write-off of debts to
the Council amounting to £145,296.86 to support the case for confirmation of a
Compulsory Purchase Order (CPO) at Millcroft Road, Cumbernauld. 
2.2 In the case of Millcroft Road, the Council owned only one of the properties in the blocks
at the time of the Housing Committee on 31st August 2022. The Council has submitted
the CPO in order to acquire the remainder of the properties to allow regeneration of the
site. Should the CPO be confirmed the Council must then compensate the owners
accordingly and as per Scottish Government CPO Guidance. 
2.3 The Audit and Scrutiny Panel have asked a number of questions in relation to the
compensation payments and CPO process.  These questions, and the responses, are
set out below: 
2.4 What is the indicative completion value for each flat? Bearing in mind that in
many cases these flats are and have, in recent years, been changing hands at
auction for relatively low prices. 
In the event that the CPO is confirmed by the Scottish Government, the compensation
level for each flat will be determined by the District Valuer who is appointed as an
impartial third party by the Council. The property owners will also be able to have a
second valuation carried out via an independent RICS accredited surveyor (which the
Council will pay the fees for to a capped level). If there is discrepancy in the valuations
then the District Valuer and owner appointed surveyor will provide satisfactory evidence
to their conclusions and a negotiated figure agreed. If agreement cannot be reached,
proceedings will take place via the Lands Tribunal to bring matters to conclusion. As
per the CPO Guidance, market value must be offered for the properties affected by the
CPO, with market value being assessed via independent RICS accredited surveyors. 
Page 2 of 240

Page 7

To date, the Council have instructed the District Valuer to assess the homes of Owner
Occupiers who have explicitly expressed an interest in having their homes voluntarily
acquired (19 in total) in order to move to the neighbouring development at Burns Road
as part of the Council’s Rehousing Strategy in advance of the CPO. The agreed values
of these homes vary between £17,000 and £43,000 depending on their size and
condition. The average value of the nineteen properties acquired to date is £23,842.11.
These acquisitions are based on Market Value determined by the District Valuer during
Summer 2022 and will be subject to change in the future depending on the timing of
the valuation and purchase of the remainder of the properties in the event the CPO is
confirmed. 
In addition to the Market Value offered, Owner Occupiers are entitled to Home Loss as
well as Disturbance payments. Scottish Government Guidance states that Home Loss
is applied “...if you have lived in a residential property for at least one year prior to its
compulsory acquisition you may be entitled to an additional payment to recognise the
distress and discomfort of having to move out of your home… An owner-occupier who
qualifies for a home loss payment is entitled to 10% of the market value of their interest
in the property, with a minimum payment of £1500 and a maximum payment of
£15,000. If you are a tenant who qualifies for a home loss payment, you are entitled to
a fixed payment of £1500. If more than one person qualifies for a home loss payment,
the amount due will be divided equally between you.” The definition of the Disturbance
payments is noted as follows: “…for losses caused as the occupier or tenant of a
property as a direct result of being disturbed from possession of your property and
other losses caused by the compulsory purchase process. This may include removal
and relocation costs, temporary/permanent loss of profits, reconnection of services,
loss of fittings and certain reasonable professional fees, such as legal fees and the
costs of employing a professional to help you assess and negotiate your compensation
claim.” Owners who do not live in their Millcroft flat are entitled to Disturbance payments
only in addition to Market Value. The entitlement to these categories of compensation
is set out in the Scottish Government CPO Guidance. 
2.5 These low prices can, in part, be attributed to title difficulty. Title difficulty
associated with the presence on the title of a charging order.  Said charging
orders which the Committee were asked to waive payment on (at the Housing
Committee on 31st August 2022) - can the service give assurance that
compensation levels will be set so that there will be no profit made by owners
due to the decision to waive sums due to the council and which were secured on
the title? 
The Council cannot confirm that no profit will be made by owners as there would be no
method of knowing or confirming this as we do not have the means to assess the
financial circumstances of individual owners of private property. Compensation levels,
as previously noted, are dictated by the Scottish Government CPO Guidance, in that
market value must be offered for the property, namely: “Open market value is based
on what a person could expect to get if they willingly sold their interest in the land on
the open market, without the threat of the compulsory purchase.” The low valuations
for the properties cannot be directly correlated to title difficulty from the charging orders,
although the lack of factoring arrangements has had a significant effect on the lack of
maintenance over many years leading to the poor condition of the properties and
amenity areas evident today. 
Page 3 of 240

Page 8

2.6  If assurance cannot be given then why did the service get the Council into this
position? 
The proposals outlined in the August committee report are considered necessary in
order to demonstrate that the Council is doing what it can to mitigate the financial
impact on affected owners and supporting the rehousing of residents, thus reducing
the risk of the CPO not being confirmed. Bad debts are written off on an annual basis
Council wide for a variety of reasons, for example relating to Rent debt and Council tax
debt, as such the debts in question at Millcroft Road have been included within the
same justification principles. However, the unique circumstances of this CPO and its
strategic goals does not create a new precedent for prematurely writing off debts owed
to the Council in the future.  At the same committee, a report titled General Debtors
Write-Off 2022 was approved which led to £462,352 of bad debts from outstanding
debtor accounts being written-off as it was deemed uncollectable. 
2.7 Specific details are requested to be presented to the Audit and Panel Process in
terms of the full process for CPOs, the resulting financial impact on the council,
and the ultimate benefits to the council. 
To support the regeneration of Millcroft Road, in November 2021, the Council approved
the making of a Compulsory Purchase Order for the 168 privately owned properties at
Millcroft Road. The Statement of Reasons was submitted to the Scottish Government
as part of the full CPO application in late March 2023. The Statement of Reasons is,
as per the Scottish Government CPO Guidance, the justification document which
makes the case for the CPO itself. It outlines the full detail of why the CPO is necessary
in order to improve the quality of housing and living standards of the designated Millcroft
area. As part of the CPO process, over 500 individual Notices were prepared and
served to all affected parties. The CPO objection period has now lapsed and a total of
3 objections to the CPO were received from landlords. No individual living at the
properties objected to the CPO. The Council has submitted responses to those
objections which are now being considered by the Scottish Government as to whether
or not they will be upheld. Formal determination is expected to take approximately 12
months from the point of submission based on previous CPOs of a similar size and
scale. However, the determination period could be extended by a further 6 months if
the Objections are upheld and an appeal with subsequent hearing is required. There is
no statutory determination period for CPOs and the Scottish Government may reach a
determination sooner or even beyond these estimated timescales. Further details can
be accessed in the Supporting Documentation section of this report including: the
Scottish Government Guidance document and the Council’s Millcroft Road CPO
documentation, including the Statement of Reasons. 
The total estimated cost of this regeneration project is estimated at £21.6m, which
includes: acquisition; Home Loss and Disturbance payments; conveyancing legal
costs; Land and Building Transaction tax (LBTT); Security Costs; DV fees; demolition
and new build costs.  The project is being funded through the HRA and grant from the
Scottish Government.  The final level of grant funding cannot be confirmed until the
CPO is confirmed, and thereafter a grant application has been approved for both the
new build element in addition to the associated costs of the CPO, such as acquisition,
Home loss, Disturbance, owner’s legal fees and valuation legal fees, all of which are
eligible for grant funding. 
The benefits to the council, and the community of Carbrain, have been outlined above. 
The council will receive rental income for the 72 new homes which will help meet the
need for social rented housing in Cumbernauld, an area of high demand.  The new
homes will be built to a modern standard with energy efficient and zero carbon heating
Page 4 of 240

Page 9

systems. They will have improved amenity spaces, include lifts, wheelchair provision
and improved connectivity to the local active travel and public transport network. 
Further details on the benefits and financial impacts on the Council were included in
detail in previously approved committee reports and are provided for reference under
Supporting Documentation along with the Millcroft CPO application including Statement
of Reasons. 
3. Measures of success 
3.1 The existing housing is no longer fit for purpose and does not meet the needs of
residents. The regeneration proposals will improve housing conditions by removing
generally poor quality housing and replacing it with high quality new build residential
accommodation which will comply with current standards and will be well managed and
maintained. 
3.2 The regeneration proposals will make a significant contribution to the enhancement of
the local community and environment at Millcroft Road and the surrounding area. The
Council therefore considers there to be a clear and compelling case in the public
interest to acquire the properties at Millcroft Road to facilitate the provision of high
quality social rented housing. Once completed the redevelopment of Millcroft Road will
contribute to the improvement of the well-being of the local residents and wider
community.   
3.3 The ultimate measure of success is approval of the Compulsory Purchase Order,
allowing wholescale rehousing of the residents at Millcroft Road, thereby facilitating
onward demolition and creation of new build properties for NLC social rent. 
4. Supporting documentation 
Housing Committee 31 August 2022, 
Millcroft Road, Cumbernauld, Compulsory Purchase Order
https://mars.northlanarkshire.gov.uk/egenda/images/att98585.pdf 
Housing and Regeneration Committee 24 November 2021,
CPO of private properties at Millcroft Road, Cumbernauld and construction of new homes
https://mars.northlanarkshire.gov.uk/egenda/images/att97188.pdf 
Enterprise and Housing Committee 2 November 2017,
1−103 and 2−204B Millcroft Road, Cumbernauld
https://mars.northlanarkshire.gov.uk/egenda/images/att86792.pdf 
Housing and Social Work Services Committee 2 February 2017,
Millcroft Road, Cumbernauld
https://mars.northlanarkshire.gov.uk/egenda/images/att85481.pdf 
Further Scottish Government guidance on the full process for carrying out a CPO
https://www.gov.scot/publications/scottish-planning-series-planning-circular-6-2011-
compulsory-purchase-orders/documents/ 
The documentation for the Millcroft Road CPO which was submitted in March 2023
Millcroft Road, Cumbernauld - Compulsory Purchase Order | North Lanarkshire Council 
Page 5 of 240

Page 10

Pamela Humphries
Chief Officer (Place) 
Page 6 of 240

Page 11

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The proposals reflect the legal advice received. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☒ No ☐  
Page 7 of 240

Page 12

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
A risk register has been developed to capture and help mitigate potential risks in
accordance with Project Management Guidelines. There are a number of risks to
the Council, including those associated with the confirmation, or otherwise, of the
CPO; financial risks in terms of project costs, and the re-housing of owner
occupiers and tenants. 
The proposals outlined in this report were considered necessary in order to reduce
the risk of the CPO not being confirmed and to demonstrate that the Council is
doing what it can to mitigate the financial impact on affected owners, and
supporting the rehousing of residents. It is recognised that there may be a negative
reaction from owners who have already paid the debt, but on balance it is
considered that the risk of the CPO failing if these debts are not written off is
significant and therefore is a necessary step to take. This therefore does not create
a precedent for writing off debts owed to the Council in the future. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
Page 8 of 240

Page 13

5.11 Children’s rights and wellbeing impact
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these?
Yes ☐                    No ☒
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐                    No ☐ 
Page 9 of 240

Page 14

Page 10 of 240

Page 15

North Lanarkshire Council
Report
Audit and Scrutiny Panel 
Does this report require to be approved? ☐ Yes   ☒ No
Ref  SL/MK/BL Date 31/08/23 
Housing Refurbishments 
From  Stephen Llewellyn, Chief Officer (Housing Management)  
E-mail llewellyns@northlan.gov.uk Telephone   01698 274192   
1. Background 
1.1 Adaptations within a home ensures that tenants and residents can undertake
everyday tasks more easily and safely as well as to live independently at home for as
long as possible, to alleviate hospital admissions and enable swifter discharge from
hospital allowing a person to return home. 
1.2 The Integrated Equipment and Adaptation Service (IEAS) is preventative and
anticipatory, in nature, which has a direct impact on reducing the need for more
intensive and higher cost health and social care services. Therefore, integrated ways
of working between Housing and Health and Social Care have become well
established practice in North Lanarkshire supporting people to live as full and
independent lives as possible. 
Executive Summary 
The purpose of this report is to update the Audit and Scrutiny Panel regarding the policy
for adaptations including wet floor showers and address the concern raised by the Panel
at its meeting on 16 February 2023 in relation to the installation of wet floor shower
rooms for new tenants following fitting of a Capital Programme bathroom at void stage.   
Recommendations 
It is recommended that the Panel note the content of this report.  
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement
(12) Ensure our residents are able to achieve, maintain, and
recover their independence through appropriate supports at home
and in their communities
Item 3
Page 11 of 240

Page 16

1.3 When a referral is made to the IEAS, a community care assessment of need is
undertaken by an Occupational Therapist, who looks at the individual situation and
needs of each person and assesses what adaptation(s) can help the individual in their
home. A decision is then made on what needs can be met. The IEAS prioritises need
because there are more needs than resources available and does so by assessing
the risk if needs are not met into four categories: 
• Critical (Priority 1)
• Significant (Priority 2)
• Moderate (Priority 3)
• Low (Priority 4) 
1.4 Not all of a person’s needs will fall into the same category, which means that some
needs may fall into a higher priority than others. If a person’s needs fall into priority 1
or 2 then the person will be eligible for support. Priority 3 needs will be met if
resources allow this. Priority 4 needs will not be met, but advice will be provided to
identify if needs can be met in another way. 
1.5 The adaptation must be based on an occupational therapist’s assessment of need
that the tenant requires a permanent adaptation. For some people, the assessment of
need may identify alternative housing solutions. 
1.6 Referrals for adaptations are received into the IEAS from individuals, their carers and
staff across the partnership working with the person, including financial inclusion,
nursing, hospital occupational therapists and physiotherapists, physiotherapists in the
Integrated Rehabilitation Teams, Social Workers, Integrated Day Services, Sensory
Impairment, Locality Support, GPs and Housing Solutions. Referrals are also
received for bathing assessments via North Lanarkshire Health and Social Care
Partnerships (HSCP) online self-assessment platform ‘Making Life Easier’. 
2. Report 
2.1 As part of the Scrutiny work programme for Audit and Scrutiny Panel, a query was
raised by Elected members in relation to potential wastage in relation to the
installation of wet floor shower rooms for new council tenants following the fitting of a
Capital Programme bathroom at void stage. Analysis of the installation of wet floor
showers over the three years 2020, 2021 and 2022 is indicated below in Table 1.
There was a notable decline in wet floor shower rooms installed during 2020 due to
the impact of the COVID-19 pandemic, with 226 wet floor shower rooms installed, 317
wet floor shower rooms were installed in 2021 and 320 installed during 2022. The
total number of major adaptations installed over the 3-year period 2020-2022 was
1012. 863 of these major adaptations were for wet floor shower rooms, which is the
main major adaptation undertaken in North Lanarkshire. The remaining 149 major
adaptations over 2020-2022 were comprised of 123 ramps, 6 external step lifts, 2
through floor lifts, 3 automatic door openers and 15 automatic toilets. 
Page 12 of 240

Page 17

Table 1: Number of Wet Floor Showers Installed 2020-2022
Calendar Year Number of WFS installed
2020 226
2021 317
2022 320
Total 2020-2022 863 
2.2  As can been seen in Table 2 below, the number of wet floor shower rooms installed
for new tenants following the fitting of a Capital Programme bathroom at void stage
were very small, with only two instances in 2022. In the context of a high volume of
overall wet floor shower room installations, 320 installed during 2022, there have
been very few instances of wet floor shower rooms being installed within one year of
the tenancy start date following fitting of a Capital Programme bathroom over the past
three years. These instances represent approximately less than 1% of all wet floor
shower rooms installed in people’s homes. 
Table 2: Number of WFS installed following new capital bathroom within 1 year of new
tenant moving in.
Year of tenancy start
date
Number of WFS installed
following new capital
bathroom (at void) within 1
year of new tenant moving in
2020 1
2021 3
2022 2
Total 2020-2022 6 
2.3 Table 3 below indicates the high volume of new Capital Programme bathrooms
completed in void properties, with 310 capital bathrooms completed in 2022. Over the
3-year  period 2020-2022, there were 960 capital bathrooms completed in void
properties. Given the high volume of new Capital Programme bathrooms completed,
there have been very few instances of wet floor shower room installations for new
tenants following the fitting of a capital bathroom at void stage, with only 2 installed in
the calendar year 2022.
Table 3: Number of new Capital Programme bathrooms in void properties by year 2020-
2022.
Year Number of Capital
Programme
bathrooms in void
properties1
2020 271
2021 379
2022 310
Total 2020-2022 960 
1 Voids includes properties acquired through the Open Market and Empty Homes Purchase Schemes
Page 13 of 240

Page 18

2.4 A capital bathroom that is issued at void stage will mainly be for two reasons: it may
have been missed when other bathrooms in the area have been replaced (previous
tenant may have refused the capital bathroom) or the bathroom is scheduled for
improvement on the current Capital Programme of works to meet the Scottish
Housing Quality Standard. A capital bathroom is installed at void stage as it is easier
and more efficient. 
2.5 At the time of inspection of a void property, the Technical Officer identifies repairs and
will check the property database if the property should have a capital bathroom
installed. Capital Programme staff liaise with the Locality Housing office to determine
if it is known at that stage the specific needs of the prospective new tenant. This
would only be in relation to ground floor amenity stock and some ground floor flats. 
2.6 In the six instances over the three-year period 2020-2022, none of the prospective
tenants indicated either on their housing application that they were seeking a house
with a wet floor shower room, or at the time of offer and viewing. In these instances,
the property would have been deemed suitable for the tenant, which met the tenant’s
housing’s needs and the tenant accepted the property following viewing of the
property at an improved standard. Health needs can change over time.  This can
necessitate a need at a later stage following an offer and allocation of a property, for
an adaptation.
2.7 It is also important to note that in the very few instances of properties with a new
capital bathroom installed at void stage only the capital bath would have been
replaced with a wet floor shower and the new capital WC and wash handbasin would
have been retained in order to minimise wastage whilst at the same time ensuring
improved housing standards.
2.8 Measures are undertaken across the Housing Service, working in partnership with
Health and Social Care to ensure a proactive approach to identifying and planning for
current and future needs, through early intervention and prevention, effective
information sharing and partnership working arrangements.  Several improvements
have been and continue to be made in relation to the provision of equipment and
adaptations and partnership working. These include:
• The implementation of an online self-assessment tool ‘Making Life Easier’,
providing signposting, advice and information on equipment and adaptations, as
well as other services and supports
• Adapting for Change e-learning module developed and in person training
delivered to housing, health and social care to encourage early intervention and
prevention to prevent housing crisis from occurring and encouraging effective
information sharing and signposting 
• Implementation of joint planning and assessment structures involving Housing,
Health and Social Care for complex adaptation cases, to improve access to a
wider range of options to meet needs
• HSCP’s intention to conduct a review of service arrangements in relation to the
IEAS to improve efficiency in identifying needs, directing resources and
measuring outcomes for individuals in need of support. Housing and HSCP will
explore referral processes to either service in relation to people who need a major
adaptation such as a wet floor shower room
• Current procurement of a new Social Work IT system which will improve
community care assessment data
Page 14 of 240

Page 19

3. Measures of success 
3.1  Robust and effective partnership processes for the assessment and provision of
adaptations that enable safety and independence whilst making best use of housing
stock in meeting needs. 
4. Supporting documentation 
N/A. 
Stephen Llewellyn
Chief Officer, Housing Management 
Page 15 of 240

Page 20

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Although this report relates to the specific protected characteristic, disability, there
is no information contained that highlights any specific adverse or other impact
arising specifically from this report.   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☒  
Page 16 of 240

Page 21

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 17 of 240

Page 22

Page 18 of 240

Page 23

North Lanarkshire Council
Report
Audit and Scrutiny Panel 
Does this report require to be approved? ☐ Yes   ☒ No
Ref  EK/NL Date 04/09/23 
Debt Recovery Review 
From  Elaine Kemp, Chief Officer (Finance) 
E-mail kempe@northlan.gov.uk Telephone 01698 302408 
Executive Summary
In 2022 an Internal Audit was undertaken on Sundry Debt and Debt Management. The
purpose of this audit was to provide assurance that the Council has adequate, robust and
effective management arrangements in place for ensuring that the management of debtors
is appropriately and effectively controlled. 
Despite collection rates of over 97%, the audit identified significant deficiencies in several
aspects of the control environment under review and as such the audit opinion was defined
as limited assurance (Amber-Red) with the recommendation that there was an urgent need
to strengthen the robustness and effectiveness of many aspects of the debt recovery
control framework through a formal review of all aspects of the framework. 
The review of this framework is nearing completion with a number of actions implemented
and the remainder to be finalised by the end of September. 
Recommendations
It is recommended that the Audit and Scrutiny Panel: 
1. Acknowledge the actions implemented so far;
2. Endorse the introduction of quarterly reporting of Debt Recovery through Senior
Management Teams;
3. Acknowledge the actions required to complete the review. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Item 4(a)
Page 19 of 240

Page 24

1. Background 
1.1. The effective management and collection of debt is an essential contributor to the
council’s financial resources and helps maximise income available to fund essential
services.  To achieve this, the council aims to issue invoices, where appropriate, and
collect all debt owing to it promptly, effectively and efficiently whilst ensuring fair and
equitable treatment to debtors in line with approved policies.    
1.2. The council has a Corporate Debt Policy and there is also a Debt Recovery procedure
manual which contain a range of information/guidance in relation to policy, procedures
and responsibilities for debtor invoices and debt recovery.  Both of these documents
are in need of review and updating as highlighted by Internal Audit. 
1.3. During financial year 2022/23, 107,849 invoices totalling £106.562m were raised,
adding to the outstanding debt from the previous year of £12.073m.  Although collection
rates are generally very high (the debt collection rate for the last four years is 97%), as
at 31 March 2023, invoices totalling £12.6m were outstanding, with £4.937m of these
outstanding in excess of 12 months.   
2. Report 
Audit Findings 
2.1 The Internal Audit opinion given was that of limited assurance (red-amber), the report
highlighted the urgent need to strengthen the robustness and effectiveness of many
aspects of the debt recovery control framework.  The recommendation given was:
“A formal review of the debt management framework should be undertaken to revisit
and refresh all aspects, including policy, procedures and operational arrangements with
a view to improving efficiency, timeliness, effectiveness and equity of the Council’s
current approach to debt management.” 
2.2 The report went on to advise that the review should include consideration of the
purpose and objectives of debt management activity and cover areas such as: 
• Establishing which activities are best done at a corporate-level and within services;
• Ensuring corporate and service roles and responsibilities are clear and
documented;
• Examining whether services are minimising the need for raising invoices by
ensuring wherever possible that payment for good and services is obtained in
advance of service provision;
• Producing clear guidance detailing key requirements for all aspects of the debt
management process (e.g. holding appropriate documentation to support debts
raised and expectations for monitoring outstanding debt and recording debt
recovery action taken); and
• Identification of the most effective methods for monitoring compliance and
performance of debt management activities. 
Accountability 
2.3 A significant part of the review was to look at Accountability and establish the role
Finance and Legal Services have in debt recovery. 
Page 20 of 240

Page 25

2.4 Each Service is responsible for raising their own invoices within the Ash Debtors system
for goods and services provided and are responsible for ensuring payment of that
charge.  However, there are a number of tools available to assist in the debt recovery
process should it be required: 
• Ash issues a system generated reminder 3 days after the payment due date.
• The sundry debt recovery team within Finance will pursue the debt if the initial
period of recovery is unsuccessful, this is normally 10 days after the reminder
has been issued.  This team have additional processes they can utilise to assist
recovery.
• Thereafter, should recovery continue to be unsuccessful, Legal Services can
raise a court action, if deemed economical to pursue. 
2.5 However, the review has concluded that it is essential that Services who raise debt
recognise that accountability for that debt remains with the service until the debt is
either paid or written off.  All effort should be made within the first 10 days of non-
payment to contact the customer to encourage payment to avoid the debt moving to
the sundry debt team or legal services. 
Actions Undertaken 
2.6 To address the audit recommendations a focus group consisting of key staff from
across the services was established to gain an understanding of current processes and
where improvements could be made. 
2.7 Following the initial meetings, the group were asked to consider a number of quick wins
which included reviewing contact information on invoices being issued, ensuring debt
recovery processes are understood across their wider teams and giving consideration
to areas where payment in advance may be appropriate. 
2.8 From this, a number of specific actions have been completed: 
• The debtors procedure manual has been reviewed and updated 
• “How to” guides have been prepared for Ash debtors reporting to give users
direct access to debt reports and move away from the current process where
reports are issued quarterly by the Sundry Debt Team
• A review of Community Alarm billing within Adult Social Care is underway in
conjunction with the Community Alarm Service review that is currently ongoing
• Each service are considering where payment in advance could be introduced
and how this could be implemented.
• A report was approved at Business Management Team to introduce a quarterly
reporting regime whereby a standing item on debt recovery would be included
on Senior Management Team (SMT) meetings.  This would detail the level of
debt raised and outstanding across the service, the actions which have been
taken during the preceding quarter to address outstanding debt and where
accounts are deemed no longer economical to pursue these would be proposed
for write off with appropriate justification provided.  This would feed into the
annual debt write off exercise presented to service committees. 
Page 21 of 240

Page 26

Planned Actions 
2.9 In order to finalise the review there are a small number of actions planned for
completion by the end of September 2023: 
• A template will be developed for the quarterly reports for SMT to ensure
consistency in what is being reported across the Council.
• The Corporate Debt Policy will be considered to ascertain where this needs
updated to reflect the outcomes of this review.
• The new procedure manual and “how to” guides will be issued to all services.
• Where charges can be moved to payment in advance Services will engage with
Business and Digital on how to progress telephone or online payments to
facilitate this.
• A revised billing system for Community Alarms will be introduced should that be
the outcome of the service review that is currently underway. 
3. Measures of success 
3.1 Measures of success will include: 
• Pro active debt monitoring with clear accountability across services.
• An improvement in recovery rates across the council. 
4. Supporting documentation 
N/A 
Elaine Kemp
Chief Officer (Finance)  
Page 22 of 240

Page 27

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Recovery rates across the council for debt are already high at 97% however
improvements in processes and reporting should have a positive impact on Council
resources.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Page 23 of 240

Page 28

Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes       ☐                    No               ☒   
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes       ☐                    No               ☒   
Page 24 of 240

Page 29

North Lanarkshire Council
Re
Audit and Scrutiny Panel 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    FW/AC Date 04/09/23 
Equality Audit 
From  Fiona Whittaker, Chief Officer (People Resources)  
E-mail Whittakerf@northlan.gov.uk Telephone 07973 728628 
Executive Summary 
This report provides Audit and Scrutiny Panel with an update on progress made in relation
to the audit carried out on the Council’s approach to managing its statutory equalities
duties. The purpose of the audit was to provide assurance on the adequacy and
effectiveness of the key controls and management arrangements associated with ensuring
that the Council complies with both its general and specific equalities responsibilities as
laid down in the Equalities Act 2010 (‘the Act’) and Equality Act 2010 (Specific Duties)
(Scotland) Amendment Regulations 2016.         
The audit was assessed as providing ‘reasonable assurance’, concluding that the Council
generally has appropriate arrangements in place to demonstrate consideration of the
Public Sector Equality Duties in mainstreaming equalities into its day-to-day functions.  The
audit also found that there are effective processes in place for ensuring that equalities
outcomes are set and reviewed in accordance with expected timescales and that key
equalities reports have been published in accordance with the Council’s specific equality
duties.
Recommendations for management consideration and action were noted in a few areas
and the report details the service’s proposed actions to address the recommendations,
along with an update on progress already made, and additional planned action to meet the
agreed timescales.  
Recommendations
It is recommended that the Audit and Scrutiny Panel: 
1)  Acknowledge the progress already made to date. 
2)   Endorse the planned activity to provide further substantial assurances that the Council 
has a sound system of governance, risk management and control to meet the 
requirements set out by the Equality Act 2010 (Specific Duties) (Scotland) Amendment 
Regulations 2016; and
3)   Acknowledge the potential for the Specific Duties to change prior to the next 
reporting period in 2025. 
Item 4(b)
Page 25 of 240

Page 30

1. Background 
1.1 In June and July 2022 an internal audit was carried out on the Council’s equalities work,
the purpose of which was to provide assurance on the adequacy and effectiveness of
the key controls and management arrangements associated with ensuring that the
Council complies with its statutory general and specific equalities responsibilities as
laid down in the Equalities Act 2010 (‘the Act’) and Equality Act 2010 (Specific Duties)
(Scotland) Amendment Regulations 2016. 
1.2 The audit assessed as providing ‘reasonable assurance’, concluding that the Council
generally has appropriate arrangements in place to demonstrate consideration of the
Public Sector Equality Duties in mainstreaming equalities into its day-to-day functions. 
The audit also concluded that there are processes in place for ensuring that the
equalities outcomes which have been set, are reviewed in accordance with expected
timescales and that key equalities reports have been published in accordance with the
Council’s specific equality duties. 
1.3  Recommendations for management consideration and action in a few areas were
identified and include that: 
• our current governance arrangements for equalities need reviewed and
improved to ensure that they remain fit for purpose. 
• improvements are needed to ensure consistent and appropriate use is
made of Equality Impact Assessments (EQIAs); and 
• improvements are needed to the equalities performance monitoring
framework including ensuring that comprehensive and robust information
is regularly and timeously reported to key stakeholders. 
1.4  The following report provides information on the work to progress the recommendations
of the equality audit and planned activity to provide Audit and Scrutiny panel with the
substantial assurances that a sound system of governance, risk management and
control exist, with internal controls operating effectively and being consistently applied
to support the achievement of objectives in the area audited. 
2. Report 
2.1 To address the areas highlighted within the audit report an agreed action plan was
developed. The progress for each of the three areas of concern are detailed within the
following section of the report along with details of further planned activity. 
2.2       Improvement Actions, Progress and Planned Activity. 
2.2.1    Review and Improve Governance Arrangements   
Recommendation 1. Establish a new vehicle to ensure better overarching governance
and a focus on the delivery of our Equalities Strategy. This is likely to be in the form of
an Equalities Delivery Board with a focus on the Equalities Delivery Framework,
engagement across services, and supporting our annual plan of activities in this area.
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (23) Build a workforce for the future capable of delivering on our
priorities and shared ambition
Page 26 of 240

Page 31

Progress 
An Equality Board was established in February 2023 that consists of full representation
from all service directorates across the Council and managers with linked remits to the
Delivery Framework for Equalities  which was agreed by the Wellbeing and Tackling
Poverty Committee in February 2023. 
The Board will ensure the Framework’s associated action plans are effectively
monitored and reviewed on a quarterly basis and that equality work is mainstreamed
across our services – Chief Executive’s Office, Education and Families, Enterprise and
Communities and Adult Health and Social Care. 
The Equality Board is chaired by the Chief Officer, People Resources. 
The Terms of Reference for the Equality Board is attached as Appendix 1 to this report. 
Recommendation 2. The corporate action plan will be updated to include individual
service actions and will include named responsible officers identified to take
appropriate actions at service and corporate level together with the relevant timescales
for taking that action. The Action Plan will be monitored through the Delivery Board. 
Progress
All current action plans to advance equalities in North Lanarkshire are currently being
reviewed and updated to meet the audit recommendations and being brought together
under the Equalities Delivery Framework action plan to bring consistency of approach
and oversight. 
In addition, this one framework will also contain:
• the service action plans, once approved by their respective service
management teams; and 
• the Equality Outcome Performance Management Framework 
This one Equalities Delivery Framework Action Plan will allow for more effective and
co-ordinated arrangements for monitoring, review, and reporting purposes.  It is on
track to be in place by 30 September 2023 and will be presented to the Equality Board
at its meeting on 2 October for approval. 
Recommendation 3. The Delivery Board will monitor the progress on the Equalities
Delivery Framework on a quarterly basis. 
Progress
The Equality Board has had two meetings to date with future quarterly meetings
scheduled. Once the Delivery Framework Action Plan is in place, updates will be
prepared in advance of all Board meetings to ensure progress is kept on track and any
corrective action required can be factored in. 
2.2.2 Equality Impact Assessments 
Recommendation 1. An immediate review of current EQIA arrangements will be
undertaken by the Equalities Manager. All user communications will be issued based
on the CMT recommendation for all staff undertaking EQIA’s to undertake a mandatory
e-learning module. 
Progress
Page 27 of 240

Page 32

The Council’s equality impact assessment guidance has been subject of both an
internal and external review. The external review was undertaken by the Scottish
Women’s Budget Group as part of the Gender Budgeting Project. The form has now
been updated and reflects better the considerations required to ensure a robust
assessment. 
The covering quality control sheet of the EqIA assessment form has been updated to
include a signed and dated confirmation that the author has undertaken the Council’s
bespoke impact assessment e-learning module as agreed as a mandatory requirement
by Corporate Management Team. 
All forms and updated guidance have now been moved to MyNL – as CONNECT is
now decommissioned. An All-User email was issued in July 2023 to highlight both the
location of the forms, the updated guidance, resources available and the need to
undergo the mandatory e-learning module. 
Recommendation 2. A wider review of EqIA arrangements will be undertaken to agree
a revised and improved approach. This will be finalised in conjunction with the
Equalities Delivery Board and rolled out into services thereafter. It is also the service’s
intention to appoint Equalities leads within each service who will take responsibility for
ensuring the effectiveness of EQIA use within their service. A revised programme of
EQIA training will be developed to support the roll out of the new process. 
Progress 
The Equality Manager is working with the Service Leads to review and improve the
approach to equality impact assessments. It is looking at: 
1. The process – how do we ensure a consistent approach across services when
undertaking assessments; and 
2. The quality – what else can we do to improve the quality of assessments that
are undertaken ensuring they evidence compliance with the general equality
duty.   
The findings and recommendations of this work will be presented to the Board for its
consideration and included in the Equality Delivery Framework and Service action
plans as required. 
Recommendation 3. The Equalities Manager will develop a process for the periodical
review of compliance within services, working in conjunction with each service
equalities leads. 
Planned activity.
The Equalities Manager has committed to carrying out the following every six months:
• A desktop review of equality considerations written within service
committee reports in partnership with Service Leads. 
• A check on published equality impact assessments to consider how
they evidence compliance with the general equality duty; and 
• Provide the Equality Board with an update report on the review
findings every six months.   
2.2.3 Performance Management Framework 
Page 28 of 240

Page 33

Recommendation 1. A robust performance monitoring framework is developed that
will allow management to measure performance and impacts more effectively and
accurately against the equality outcomes and allow for periodic assessments to be
undertaken. This should include identifying clear and realistic targets for each
outcome and consideration of current and future planned actions which are designed
to contribute to the achievement of these outcomes. 
Progress
As detailed in section 2.3.1 a new Equalities Board has been established to oversee
the work to mainstream equalities across the Council as well as the progress in
relation to the Council's nine equality outcomes. A new Performance management
framework is developing and will be in place by 30 September. This PMF is based on
one previously developed and used by the Council and lauded by the Equality and
Human Rights Commission as good practice due to its ability measure performance
and impacts effectively.   
Board members were selected for their operational role in relation to the Equalities
Delivery Framework and the equality outcomes.  The Board members are currently
working with the Equalities Team to develop SMART action plans for each of their
services and within these plans the equality outcomes will also sit - adjacent to the
service where they belong to ensure the outcomes are not only SMART but
mainstreamed.   Services have been asked to have the action plans ready by 30
September 2023 as agreed with audit.         
Recommendation 2. Ensure that robust arrangements are in place to enable accurate
and up to date information to be collated and reported to key stakeholders in
accordance with the committee and statutory timescales.    
Progress
The equality outcomes progress report, required by the Public Sector Equality Duties
to be published every 2 years was published on the Council website in April 2023 and
subsequently approved by the Wellbeing and Tackling Poverty Committee in line with
the PSED timescales. 
The next equality outcomes progress report is to be published by 30 April 2025. With
the new performance management framework in place the Equalities Board and the
Equality Team will work back from this date to ensure information is reported in
accordance with committee and statutory timescales. 
Recommendation 3. Seek to ensure greater transparency underpins the process for
identifying / setting/ prioritising equality outcomes/ targets and associated actions. 
Planned Activity. 
Equality outcomes are to be reviewed and set every 4 years taking reasonable steps
to involve and consider relevant evidence. The next set of outcomes require to be set
by 30 April 2025. The Equality Board will ensure the necessary steps are in place to
develop a process which aligns with the recommendations of the audit. This process
will be set out by end of March 2024 and will align with the review of the Council’s
Equality Strategy. 
The Panel should also be aware that the Scottish Government is expected to
imminently publish its findings of the review of the Scottish Specific Duties - which
includes the duty to publish equality outcomes and report on progress. Any changes
Page 29 of 240

Page 34

to the duties will need to be taken into consideration as we move to review and set
the Council's next equality outcomes in 2025.                   
3. Measures of success 
3.1  Audit and Scrutiny Panel have substantial assurances that a sound system of
governance, risk management and control exists within the Council’s work to meet the
requirements set out by the Equality Act 2010 (Specific Duties) (Scotland) Amendment
Regulations 2016. 
4. Supporting documentation 
1. Equality Board Terms of Reference 
Fiona Whittaker
Chief Officer (People Resources) 
Page 30 of 240

Page 35

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The report supports and further advances the Council’s duty to comply with the
Public Sector Equality Duty. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒
Page 31 of 240

Page 36

If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 32 of 240

Page 37

Author Audrey Cameron
Contact
Details
cameronau@northlan.gov.uk
Owner/s Fiona Whittaker whittakerf@northlan.gov.uk
Version Control 
Date 10/20/2023 Document No. 0.1 Document Status Draft for comment
22/02/2023 0.2 Final Draft
North Lanarkshire Council 
Equalities Delivery Board – Terms of Reference 
Page 33 of 240

Page 38

1.  Our Responsibilities   
1.1   The Equality Strategy 2019-24 sets out how the Council can effectively deliver on the asks of the
Equality Act 2010 Public Sector Equality Duty (General Duty) to mainstream equality into its day-to-day
business. It underlines the Council’s ambition for North Lanarkshire to be the place to live, learn, work,
invest and visit for all. This requires that we find effective ways through our policies, programmes, and
activities to address the inherent disadvantage and inequality that certain groups of people experience
because of societal constructs, policies, prejudice, direct and indirect discrimination.
1.2 Aligned to this strategy, the Council has set out 5 mainstreaming objectives for success:
1. to know and understand all our communities 
2. to involve our communities effectively  
3. to demonstrate leadership in equalities and human rights, both within the Council and amongst
partners, and commitment to organisational excellence 
4. to ensure that local public services are responsive to different needs and treat users with dignity
and respect 
5. to develop and sustain a skilled and committed workforce able to meet the needs of all local
people. 
1.3 Delivering Better Equality Outcomes 
Following a review of our approach to delivering on these 5 objectives, a revised delivery framework for
Equalities (set out in figures 1 and 2 below) was agreed by the Wellbeing and Tackling Poverty Committee
in February 2023.   
Figure 1 sets out the statutory drivers for this work; our objectives and enablers; our 9 Equalities
Outcomes for 2021-2025 and our 3 priority areas of delivery which will shape how we achieve these
objectives and desired outcomes.   
Figure 1 
Page 34 of 240

Page 39

Figure 2 shows the key areas of delivery focus which will underpin this work and the specific equalities campaigns
and activities we will be taking forward within the next 12 – 18 months.   
Figure 2 
1.4 Equalities Audit
In October 2022, our Equalities plans were subject to a full corporate audit by the Audit and Risk team. 
The purpose of the audit was to provide assurance on the adequacy and effectiveness of the key
controls and management arrangements associated with ensuring that the Council complies with its
statutory general and specific equalities responsibilities as laid down in the Equalities Act 2010 (‘the
Act’) and Equality Act 2010 (Specific Duties) (Scotland) Amendment Regulations 2016 (as detailed in
Appendix 2 of this report). 
1.5 Although the Audit was graded as providing reasonable assurance of our work in this area, there were a
number of specific recommendations for management action, and these included: 
• revised governance arrangements for Equalities to improve engagement and
oversight of relevant activities and plans, both corporately and within services
linked to the delivery of our outcomes
• ensuring the consistent and appropriate use of Equality Impact Assessments
(EQIAs) for significant organisational changes 
• improving our equalities performance monitoring framework including ensuring
that comprehensive and robust information is regularly and timeously reported
to key stakeholders, including Elected Members.  
1.6 As part of taking this work forward it was agreed that an Equalities Delivery Board would be
established, with full representation from all service directorates across the Council, and a number of
specific services with linked remits, and that this Board would be afforded overall responsibility for
driving the delivery of the Equalities Strategy both corporately and at a service level.   
Page 35 of 240

Page 40

1.7 The Purpose of the Equalities Delivery Board
The Equalities Delivery Board will:
• enable collective ownership of the delivery of the Council’s Equalities Strategy and its
associated objectives and outcomes
• ensure the effective implementation of the Equalities Delivery Framework 
• provide a cross-service approach to the advancement of equality in the line with the
ambitions set out in the Plan for North Lanarkshire
• advise the Council on matters of compliance re the Public Sector Equality Duties
(General and Specific) and any relevant implication for Council policy
• support and champion the work of the Employee Equality Forum, and other corporate
equalities campaigns and activities 
• engage across services to ensure equality is embedded and advanced via the
development of individual service Equality Action Plans 
• Encourage improved equalities reporting amongst our employee base and provide ideas
and input for ways in which we can directly engage residents and groups of staff.  
• Consider relevant religious, cultural and other Equalities related events, conferences and
celebrations that the Council may wish to support and participate in e.g Pride Glasgow 
• develop a robust performance monitoring framework that will more effectively measure
performance and impacts against our equality outcomes. 
1.8 The role of the Equalities Champion 
The Council’s Equalities Champion is one of the key Sponsors of the Councils Equalities
programme of work and is a senior politician who demonstrates support for equality and
diversity matters and initiatives both within the council and across North Lanarkshire's
communities.   This is critical role in support of our Equalities Agenda and ensures that it
has visibility and agency particularly within out communities and wider partner agencies
across North Lanarkshire.   
Our Elected Member Equalities Champion will: 
•  provide leadership − raise the profile of and promote equality within the Council
and its communities. 
•  provide scrutiny − ensure that equality consideration are embedded in the
decision making and governance of the Council. 
•  drive change − request, where appropriate for an examination on an aspect of
equality to be carried out for the purpose of progress and call for action to be
taken where disadvantage exists for people with particular protected
characteristics. 
•  provide representation − represent the Council at a political level on regional
and national forums where equality matters are concerned. 
•  provide support − attend and endorse equality related employee and
community events as appropriate. 
• meet on a regular basis with key Council officers. 
The Council’s Elected Member Equalities Champion will be involved with the Equalities
Delivery Board on an oversight basis, ensuring that the Board outcomes are meeting the
desired outcomes, but they will not be involved in actual tasks associated with achieving
the work of the Board. 
Page 36 of 240

Page 41

1.9 Executive Sponsor for Race 
As part of the Council’s commitment to sign up to the Race at Work Charter, we have now appointed an
Executive Sponsor for Race. This role entails providing visible leadership on race and ethnicity and is an
important ally for driving change, particularly in areas where there are stubborn inequalities that
require systemic and cultural change. The Council’s Depute Chief Executive has agreed to step into this
role and in doing so has fulfilled the requirement that this appointment be one of our most senior
officers. 
The importance of this role cannot be overstated. Having a highly visible Chief Officer will underscore,
for current and prospective employees, not only the Council’s commitment to advancing equality but
will also support more effective engagement with our BAME employees. 
The Executive Sponsor has indicated what he wants to achieve in the coming two years, with the
support of the Equalities Team, and the Equalities Delivery Board and this includes: 
• hosting a conference for our Black, Asian and Minority Ethnic employees in
partnership with our Employee Equality Forum
• building on the BAME employee survey that was carried out in 2021 such a
conference will be an important first step in engaging with BAME employees to
help set the future priorities for the role and give BAME employees the confidence
that their worth is valued and prioritised in our organisation. 
• exploring with our BAME employees the potential for: 
- creating a network of Race Equality Champions in the
workforce across services; and 
- developing a BAME employee network
• a mentoring programme for BAME employees that will include mentors in a variety
of positions in the Council starting with Heads of Service
• considering where positive action can be used to increase BAME employees in
promoted posts
The Executive Sponsor for Race will not be a formal member of the Equalities Delivery Board but will
engage with the Board on an ongoing basis as required to engagement in delivering place to meet the
goals of our recent agreed Advancing Race Equality Action Plan which was agreed with the Wellbeing
and Tackling Poverty Committee in February 2023.   
2.  Board Membership   
2.1  The Board is sponsored by the Corporate Management Team and the Council’s Equalities Champion and
will be chaired by the Chief Officer, People Resources.  Membership of the group will consist of
representation from all Council Services with special focus on areas set out within the Equalities Delivery
Framework. 
Roles Name of Officer Designation 
Chair  Fiona Whittaker  Chief Officer (People Resources)
Corporate Board
Members 
Audrey Cameron Equalities Manager
Elaine Wightman Equalities Assistant ( Board Secretary)
Donella Duff Supported Enterprise Service member
Page 37 of 240

Page 42

Leanne Pollock Community Partnership member 
Colin Fraser Stratgeic Communications member
Sara Tennant Hub Operating Model member
John Campbell Tackling Poverty Team member
Service
Directorate 
Board
Representatives
Marie-Claire Hendry Education & Families Service Representative
Rachel Blair Chief Executives service representative & Legal
Manager, People 
Graeme Cowan Adult Health & Social Care Representative 
Margaret Kelly  Enterprise & Communities service representative 
& Business Strategy Manager, Housing Solutions. 
2.2 Service representatives for the four main service directorates will also be required to work with the Board
to create and maintain a working service Equality Action Plan and to have this approved by and reported
to their Service Management Teams on a regular basis.   
2.3 The work of the Equalities Delivery Board will be co-ordinated by the Equalities Manager, supported by
the Equalities Assistant. 
3.  Delivery Board Meetings     
3.1 Date of first meeting: 27.3.23 
3.2 The Board shall meet quarterly with working groups forming to undertake specific areas of work at the
request of the Board.
3.3 Meeting organiser: Equalities Manager (EM)
3.5 The EM will record actions points from the meeting and circulate these within 1 week to Board  
members for approval.
3.6 Board members agree to prioritise their attendance at Board meetings, where this is not possible a
depute may be requested to attend meetings on their behalf. 
4. Governance and Reporting 
4.1 The Board will report to the Corporate Management Team. Equality Reports are presented to the
Wellbeing and Tackling Poverty Committee. 
5. Quorum 
5.1 There being no defined number of members, quorum will be deemed as a minimum number of 6
attendees 
Page 38 of 240

Page 43

Appendix 1 
Equalities - Key Roles and Responsibilties 
Roles Name of Officer Definition of Role/Responsibilities
Board Sponsor (BS) Councilor Ayesha Khan, Equalities Champion.  The Board Sponsor will not be directly involved in the implementation or
actions associated with the Board but will attend Board meeting on
occasion to engage with and oversee the work of the Board. 
Chair and Senior
Responsible Officer
(SRO)
Fiona Whittaker, Chief Officer, People Resources The SRO chairs the Equalities Board. The Senior Responsible Officer has
overall responsibility for ensuring the functions of the Board are
implemented successfully. 
Vice Chair and the
Council’s Equalities
Manager 
Audrey Cameron, Equalities Manager Responsible for co-ordinating Board activity and deputising for the Chair
in their absence. 
Key organisers  Chair (SRO) Fiona Whittaker These officers will take primary responsibility for the effective
functioning of the Equalities Delivery Board as set out in the above Terms
of Reference.  They will also provide oversight to Corporate Management
Team, the Councils Equalities Champion and Elected Members through
the Wellbeing and Tackling Poverty Committee. 
Vice Chair Audrey Cameron
Secretary Elaine Wightman 
Page 39 of 240

Page 44

Page 40 of 240

Page 45

North Lanarkshire Council
Report
Audit and Scrutiny Panel 
Does this report require to be approved? ☐ Yes   ☒ No
Ref KA/ASP/Aug23 Date  04/09/23
Audit and risk-related items: Action log
From:  Ken Adamson, Chief Officer (Audit and Risk)
Email:  adamsonk@northlan.gov.uk Telephone: 07939 280602
Executive Summary
The purpose of this report is to allow elected members to track implementation of outstanding
requests and recommendations made by the Panel in respect of audit and risk-related items.
The attached log (at Appendix 1) records those audit and risk-related requests and
recommendations made by the Panel and when these were addressed and/or are expected to be
addressed. 
Recommendations
The Panel is invited to note the report. 
The Plan for North Lanarkshire: 
Priority:   All priorities
Ambition statement All ambition statements 
Ken Adamson, Chief Officer (Audit and Risk) 
Item 5
Page 41 of 240

Page 46

Appendix 1 Audit and risk related items: Outstanding action log.
Meeting Requests or agreed action Status
May
2023
1. Request a report be brought back by management to a future meeting on
progress implementing agreed actions in relation to audit recommendations
in the Internal Audit reports ‘Payments to staff - overtime and travel and
subsistence’.
Not yet due - timescales for agreed actions are not yet due
and will be reported on, as they fall due, in line with Internal
Audit’s arrangements for reporting on follow-up.
2. Request a further report be brought back by management to a future
meeting on progress implementing outstanding actions identified by Internal
Audit follow-up work in relation to risk management.
Not yet due - timescales for agreed actions are not yet due
and will be reported on, as they fall due, in line with Internal
Audit’s arrangements for reporting on follow-up.
3. Request a further report be brought back by management to a future
meeting on outstanding actions identified by Internal Audit follow-up work in
relation to managing strategic change.
Not yet due - timescales for agreed actions are not yet due
and will be reported on, as they fall due, in line with Internal
Audit’s arrangements for reporting on follow-up.
4. Request a further report be brought back by management to a future
meeting on outstanding actions identified by Internal Audit follow-up work in
relation to ‘Employee Service Centre – key controls.
Not yet due - timescales for agreed actions are not yet due
and will be reported on, as they fall due, in line with Internal
Audit’s arrangements for reporting on follow-up.
February
2023
5. Request a further report be brought back by management to a future
meeting outlining how the Council plans to strengthen pre-employment
checks or otherwise address the issue highlighted in the Investigation:
Primary School A Internal Audit report regarding the Council re-employing
someone who has previously left during a live fraud or disciplinary
investigation.
Complete - A report on these matters was submitted to the
May meeting of the Panel.
6. Request a further report be brought back by management to a future
meeting outlining progress of agreed actions in respect of issues raised in
the Internal Audit report on Supply Teachers
Complete - A report on these matters was submitted to the
May meeting of the Panel.
7. Request a further report be brought back by management to a future
meeting outlining how the organisation identifies, ensures, and gains
assurance that staff are undertaking all relevant mandatory training.
Complete - A report on these matters was submitted to the
May meeting of the Panel.  
Page 42 of 240

Page 47

Appendix 1 Audit and risk related items: Outstanding action log.
Meeting Requests or agreed action Status
November
2022 
8. A further report be brought back by management to a future meeting on
progress made implementing agreed actions in relation to audit
recommendations in the Internal Audit report on Sundry Debtors/Debt
management.
Complete - A report on these matters is included as a
separate agenda item for this meeting of the Panel.
9. A further report be brought back by management to a future meeting on
progress implementing agreed actions in relation to audit
recommendations in the Internal Audit report on Equalities.
Complete - A report on these matters is included as a
separate agenda item for this meeting of the Panel.
September
2022
10. Internal Audit to provide specific assurance that management actions
proposed in response to Business Continuity Planning are progressed in
line with agreed timescales.
Partially complete - timescales for agreed actions are not
yet due and will be reported on, as they fall due, in line with
Internal Audit’s arrangements for reporting on follow-up.
11. Updates on the management of key corporate risks to be provided to the
Panel in accordance with agreed timetable included at Appendix 3 of Risk
Management update report.
Partially complete – two of the three planned reports
(Supply chain and Governance, leadership and decision-
making) were included in the papers for the November 2022
meeting.  Work on the third planned report (Resources
aligned with future target operating model) is underway but
not yet complete and will be reported later.
June 2022
Internal Audit to provide an update on whether management actions
proposed in response to Internal Audit investigation into overtime issues
within Waste and Fleet have been implemented and adequately addressed
the weaknesses/identified areas for improvement.
Complete - A report on these matters is included as a
separate report within the Internal Audit progress report
agenda item for this meeting of the Panel.
Standing
item
Implementation by management of actions agreed in response to External
Audit's recommendations (Annual Report) be monitored through reports from
Internal Audit.
Complete – This is addressed through the Follow-up of
Internal and External Audit recommendations report included
as a separate agenda item for this meeting.
Internal Audit provide a report to future meetings of the Panel on progress
made in implementing agreed management actions in relation to all Internal
Audit recommendations categorised as “red” or “amber”.
Complete – This is addressed through the Follow-up of
Internal and External Audit recommendations report included
as a separate agenda item for this meeting. 
Page 43 of 240

Page 48

Page 44 of 240

Page 49

North Lanarkshire Council
Report
Audit and Scrutiny Panel 
Does this report require to be approved? ☐ Yes   ☒ No
☐approval ☒noting Ref KA/ASP/Sept23 Date 04/09/23 
Internal Audit progress report 
From:  Ken Adamson, Chief Officer (Audit and Risk)
E-mail: adamsonk@northlan.gov.uk Telephone 07939 280602 
Executive Summary
The purpose of this report is to provide an overview of Internal Audit activity and to report the
results of Internal Audit outputs finalised since the last update to the Panel in May 2023.  This
report highlights the most significant issues arising from these recently completed Internal
Audit assignments as well as providing updates on other aspects of the work of Internal Audit.
Appendix 1 provides a summary of the scope and key findings of each substantive planned
audit report and relevant investigative outputs.   Full copies of the relevant audit outputs
highlighted in this report are also included in the meeting paper in line with best professional
practice and the approved Internal Audit Charter and associated reporting protocol.
The 2023-24 Annual Plan was approved by the Audit and Scrutiny Panel in May 2023.  The
Internal Audit Charter, most recently approved by the Panel in September 2021, requires that
the results of Internal Audit’s work be periodically reported to CMT and the Panel.  This report
fulfils that expectation.
Recommendations
The Panel is invited to:
(a) note the findings, conclusions and recommendations of completed Internal Audit reports
together with the associated management responses;
(b) consider whether there are any issues raised by Internal Audit which the Panel consider
are sufficiently significant to require a further report from management to be submitted
to a future meeting of the Panel;
(c) request that Internal Audit provide a report to future meetings of the Panel reporting
progress made by management implementing agreed management actions in relation
to all audit recommendations categorised as ‘High’ or ‘Medium’; and
(d) otherwise note this report.
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Item 6
Page 45 of 240

Page 50

1. Background
1.1 The 2023-24 Annual Plan was approved by the Audit and Scrutiny Panel in May 2023. 
The Internal Audit Charter, most recently approved by the Panel in September 2021,
requires that the results of Internal Audit’s work be periodically reported to CMT and
the Panel.  This report fulfils that expectation. 
2. Report
Audit reviews completed in the period
2.1 Table 1 below provides an overview of completed Internal Audit reports since the last
update to the Panel in February.  These outputs were included in the 2022-2023 Internal
Audit Plan.  Work is currently underway on other assignments included in the 2023-24
Plan and this work will be reported to the Panel as it is completed.
Table 1: Completed Internal Audit outputs in the period
Subject Internal Audit Opinion
1. Waste/Fleet staffing issues – follow-up Limited assurance
(Amber-Red)
2. Housing allocation Reasonable assurance
(Green-Amber)
3 Counter-Fraud arrangements Reasonable assurance
(Green-Amber)
4 Procurement – achieving best value Reasonable assurance
(Green-Amber)
5 Investigation – Grant Claim (note 1) Not applicable
Note 1:  In line with the Internal Audit Reporting Protocol, information relating to this work and a copy of the
full audit report are not included in the papers for this meeting (see explanation at paras 2.23 to 2.25)
2.2 Appendix 1 provides a summary of those reports forming part of the annual programme
of planned assurance work and investigation reports as required by the Internal Audit
Charter and associated reporting protocol.  This report excludes audit outputs produced
for the North Lanarkshire IJB which are reported directly to its senior management team
and audit committee.
2.3 Appendix 2 contains detailed definitions of the categories used by Internal Audit when
making recommendations, providing an audit opinion and on the extent of assurance
which is being provided to management and Panel members on those systems or areas
of Council operations examined by Internal Audit.
2.4 In addition to the above reports, work is currently underway on a range of topics including
Social Work quality assurance arrangements, payments to staff, climate change, treasury
management and council tax .  Once finalised, these reports will be submitted to a future
meeting of the Panel.
Commentary on completed planned ‘core’ Internal Audit work
2.5 The nature of Internal Audit exercises means that most audit reviews invariably find some
scope for improvement, usually in the form of controls which are weak or only partially
effective and, therefore, contain recommendations.  
Page 46 of 240

Page 51

2.6 One of the four substantive non-investigation reports being reported in the period is
assessed as providing only limited assurance, while the remaining three reports provided
more positive levels of assurance.  All four reports contain a range of improvement
actions and audit recommendations.
2.7 Our report, Follow-up of investigation of staffing issues within Waste and Fleet
Resources, was designed to provide independent assurance on whether management
actions agreed in response to the February 2022 Internal Audit report on staffing/overtime
issues within Waste and Fleet Resources had been progressed in line with agreed
timescales and that key weaknesses had been addressed.
2.8 We were pleased to note that many of the management actions agreed in response to
the previous audit report and included in the resultant action plan had been progressed. 
However, after reviewing the actions taken by management, we have concluded that
many are, as implemented, not sufficient to effectively address the weaknesses identified
and we consider that there remain significant gaps and/or weaknesses in the control
environment and instances of non-compliance with expected procedures which we
consider require to be urgently addressed by management.
2.9 Most significant, were the need to ensure compliance with all key corporate expectations
within recruitment processes, including in respect of successful candidates meeting
essential criteria for specific roles and the Service failing to comply with corporate
expectations surrounding payments to staff and/or routinely using enhanced rates to
deliver core services and without appearing to always exercise proper control over the
use of such payments.  As a result of the additional findings identified during this audit,
we have raised several new recommendations, which are detailed in section 3 of the
audit report.
2.10 The Panel should note that, while providing satisfactory management responses,
including planned actions, the relevant senior managers, Chief Officer (Community
Operations) and Chief Officer (People Resources), disagree with Internal Audit’s
assessment of ‘limited assurance’ and consider that the audit opinion over-emphasises
the significance and/or severity of the issues identified and that the findings raised do not
create or represent major financial, operational or reputational risks to the Council.
Internal Audit consider the assessment appropriate based on the findings detailed in the
report.
2.11 Our work on Housing Allocations was designed to provide assurance on adequacy and
effectiveness of the Council’s key controls and management arrangements associated
with the process of allocating Council houses and the extent to which the system and
associated processes are operating in line with approved Council policies.  As well as the
administration of the ‘waiting list’ and how applicants are offered housing, the review also
covered how the Service manages tenancy succession.
2.12 Based on the results of our work, we assessed the audit as providing ‘reasonable
assurance’ as we concluded that there is a generally sound control environment in place
although some issues and areas for improvement were identified.  We were pleased to
note that the Council’s arrangements for the management of housing allocations,
including management of the waiting list, making housing offers and assessing
applications for tenancy succession were generally being conducted in line with approved
Council policies.  We identified a small number of areas for improvement.
2.13 The most significant of these related to the need to record the rationale more clearly for
both the waiting list and applicant selected when an offer is made to an applicant who is
not top of the selected waiting list to increase transparency and to enable the Service to
better demonstrate that decisions made were appropriate.  Members should note,
however, that we found no evidence of inappropriate allocation decisions being made by
the Service.  Satisfactory responses and planned actions have been received from
management in response to the issues raised.   Page 47 of 240

Page 52

2.14 Our work on the Council’s Counter-fraud arrangements was designed to provide
assurance on the adequacy and effectiveness of the Council’s Anti-Fraud Policy and
associated management arrangements for the prevention and detection of fraud to
identify any actions necessary to update the policy and to assess whether the Council’s
arrangements were consistent with recognised good practice.
2.15 We have categorised this audit as offering ‘reasonable assurance’ as we consider that
the Council’s arrangements are generally aligned with good practice as responsibility for
ensuring that risks of fraud and corruption are managed effectively has been
acknowledged and is embedded in the Council’s governance arrangements, a risk
management framework is in place, which includes a corporate risk for ‘serious organised
crime, fraud or corruption’ and there is an approved Anti-Fraud Policy in place which
details the Council’s attitude to fraud and its approach to the prevention, detection and
investigation of fraud across all of the Council’s service areas.
2.16 We have, however, identified a small number of areas for improvement including the
need to better align the Council’s counter fraud arrangements with good practice by
considering whether the approach to fraud work could be more pro-active rather than
reactive and whether establishing a dedicated counter-fraud resource might be
cost-effective.  We also highlighted scope for improvement in the consideration and
inclusion of fraud risks in Service Risk Registers, reporting on recognised fraud risks and
on the need for awareness raising, more generally, in relation to fraud risks and how
these can be prevented, detected and reported.  Satisfactory responses have been
received from management to the issues raised.
2.17 Members are reminded that in line with the Internal Audit Charter and to ensure the
independence of the Internal Audit function when reviewing an activity for which the Chief
Officer (Audit and Risk) also has line management responsibility, this work was led by
the Principal Auditor and planned and conducted without the involvement of myself,
(instead in my role as Chief Officer (Audit and Risk), I assumed the role of client during
the audit process).
2.18 Our report on Procurement – achieving best value was designed to provide assurance
on the Council’s procurement arrangements, particularly in relation to contracts awarded
on the basis of single tender responses.  The Audit and Scrutiny Panel specifically
requested that this work be undertaken following several elected members expressing
concerns over an apparent increase in the number of reports to Committees awarding,
or seeking approval to award, contracts where there has only been a single tender
response, with consequential concerns about a lack of competition, whether the Council
is securing best value and the risk of anti-competitive behaviour amongst potential
bidders.
2.19 Based on the results of our work, we have categorised this audit as offering ‘reasonable
assurance’.  We noted that there are several different routes for procuring supplies,
services and works and were pleased to note that there are clear expectations and
documented guidance available to all Services undertaking procurement activity.
2.20 In response to the specific concerns raised by members regarding an apparent increase
in the number of contracts where there has only been a single tender response, our
review and analysis of performance information indicates that there was not a high
incidence of single tender responses but that we consider that the way in which
procurement outcomes are being reported could be misleading and therefore,
understand why elected members have raised concerns.  We identified a number of
areas where we consider that there is scope for improvement.  
Page 48 of 240

Page 53

2.21 These include that ‘below threshold’ reports to committee should be amended to more
clearly convey the level of competition and how best value has been achieved.  We also
raised that key procurement documentation and reports for contracts awarded need to
better convey how best value has been achieved and recommended that performance
information in relation to procurement activities could be improved.
2.22 Satisfactory management responses including agreed proposed actions have been
received from management in response to the recommendations contained in the report.
Commentary on completed unplanned ‘non-core’ Internal Audit work
2.23 There is one fraud/irregularity investigation report arising from areas of unplanned or
‘non-core’ work undertaken by Internal Audit in the period that requires to be reported to
the Panel in accordance with the Internal Audit reporting protocol.
2.24 The Internal Audit reporting protocol previously agreed by the Panel commits Internal
Audit to openness and transparency in reporting on its work, but recognises that different
considerations sometimes need to be applied when considering how to report the results
of Internal Audit investigative work in relation to suspected fraud, corruption, thefts and
other irregularities.  The protocol is designed to reflect the balance to enable the Panel
to be suitably informed to effectively discharge its role with potential sensitivities around
data protection issues, the risk that disclosure could sometimes potentially prejudice
existing controls and security arrangements and the need to avoid prejudicing any
ongoing Police involvement and/or disciplinary processes.  There is also a recognition of
the need to reflect materiality in reporting the results of such work by considering the
nature and significance of the issues reviewed.
2.25 In line with the above considerations, no further information in relation to the work
undertaken has been included in the papers for this meeting.
Other Matters – Internal Audit Performance
2.26 In March 2021, the Panel were presented with a revised performance management
framework for Internal Audit that was to be implemented from April 2021.  Most indicators
are reported on an annual basis.  There are two indicators however that are subject to
quarterly reporting.
2.27 The first is about the implementation of agreed actions arising from Internal Audit reports
by the implementation date.  38% of agreed actions have been implemented by the
agreed implementation date in the period to June 2023.  Progress in implementing agreed
actions is monitored and reported separately to the Panel each cycle.
2.28 The second performance indicator is about client satisfaction and reflects provides the
results of four key questions we ask audit clients at the conclusion of each audit
assignment.  Results presented in the Annual Internal Audit report to the June meeting
of the Panel showed generally positive feedback on the work of Internal Audit with most
respondents agreeing that Internal Audit added value by assisting in providing assurance,
and that reports were relevant and constructive with findings clearly and accurately
communicated.  As only a small number of responses have been received in this period,
this data will be carried forward and reported in more detail in the next update.
2.29 Where management raise concerns over Internal Audit’s work, these matters are
discussed with relevant senior management to fully understand the nature of any
concerns and, where it is considered appropriate, to identify areas for improvement.  We
also seek Services’ views on what they liked or disliked about the audit process and
comments received are used to inform future action plans for improving the service
provided by Internal Audit.  
Page 49 of 240

Page 54

2.30 Finally, the Panel will be aware that one of the key annual performance indicators for the
function is the percentage of the Internal Audit Plan (the Plan) completed each year, with
a target of 90% set for this indicator.  I require to inform the Panel that performance
against this indicator is likely to be impacted in 2023-24 by some current long-term
sickness absence within the team.  Consequently, some planned work will require to be
delayed, postponed or cancelled.  I will update the Panel more fully on the impacts and
decisions about which audits within the Plan will be prioritised as part of the next progress
report in November.  
3. Measures of success
3.1 Internal Audit reports annually on its performance to the Panel and is also subject to
review annually by the Council’s appointed external auditors. 
4. Supporting documentation
Appendix 1 Summary of Internal Audit assignments completed in the period
Appendix 2 Audit gradings
Appendix 3 Internal Audit performance framework 
Ken Adamson, Chief Officer (Audit and Risk) 
Page 50 of 240

Page 55

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact because of the Public Sector Equality
Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data?  
Yes ☐ No ☒
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
5.8 Communications impact
Does the report contain any information that has an impact on the council’s communications
activities?
Yes ☐ No ☒
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If yes, please provide a summary of the key risks and potential impacts, highlighting where
the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk Registers),
and how they are managed?
Effective responses by management to the weaknesses, control issues and/or areas of improvement
identified by Internal Audit will increase the likelihood of the Council achieving its ambitions by
improving control frameworks and more effectively mitigating potential risks and threats to the
achievement of planned outcomes.
5.10 Armed Forces Covenant Duty
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does it
relate to healthcare, housing, or education services for in-Service or ex-Service personnel, or
their families, or widow(er)s)?
Yes    ☐                No ☒
5.11      Childrens rights and wellbeing impact
Does the report contain any information regarding any council activity, service delivery, policy,
or plan that has an impact on children and young people up to the age of 18, or on a specific
group of these?
Yes ☐         No ☒ 
Page 51 of 240

Page 56

Appendix 1
Summary of Internal Audit assignments completed in the period
Internal Audit outputs: Audit opinion and commentary
1 Follow-up of investigation of staffing issues within Waste and Fleet Resources
Internal Audit Opinion:    To be confirmed
Audit recommendations: High 2 Medium 1 Low 1 
The purpose of this audit was to provide independent assurance that management actions
agreed in response to the February 2022 Internal Audit report on staffing/overtime issues
within Waste and Fleet Resources have been progressed in line with agreed timescales and
that key weaknesses have been addressed.
In response to the issues raised in the February 2022 report, the Service prepared an action
plan detailing the recommendations from the initial audit report and identifying responsible
officers and the actions required to address the recommendations.  This action plan was
discussed and monitored at management meetings and was updated on an ongoing basis to
reflect progress.
From our testing, we were pleased to note that most of the management actions agreed in
response to the previous audit report and included in the resultant action plan have been
progressed.  However, after reviewing the actions taken by management, we have concluded
that many are, as implemented, not sufficient to effectively address the weaknesses identified
and we consider that there remain significant gaps and/or weaknesses in the control
environment and instances of non-compliance with expected procedures which we consider
require to be urgently addressed by management.
Most significant, were the need to ensure compliance with all key corporate expectations within
recruitment processes, including in respect of successful candidates meeting essential criteria
for specific roles and that the Service regularly fails to comply with corporate expectations
surrounding payments to staff and/or routinely has to resort to using enhanced rates to deliver
core services and without appearing to exercise proper control over the use of such payments. 
As a result of the additional findings identified during this audit, we have raised several new
recommendations, which are detailed in section 3 of the audit report.
The Panel should note that, while providing satisfactory management responses, including
planned actions, the relevant senior managers, Chief Officer (Community Operations) and
Chief Officer (People Resources), disagree with Internal Audit’s assessment of ‘limited
assurance’ and consider that the audit opinion over-emphasises the significance and/or
severity of the issues identified and that the findings raised do not create or represent major
financial, operational or reputational risks to the Council. Internal Audit consider the
assessment appropriate and the content of the report sets out our rationale for the stated audit
opinion.
Satisfactory management responses including agreed proposed actions have been received
from management in response to the recommendations contained in the report. 
Page 52 of 240

Page 57

Appendix 1 (continued)
Summary of Internal Audit assignments completed in the period
Internal Audit outputs: Audit opinion and commentary
2 Housing allocations
Internal Audit Opinion:    Reasonable assurance (Green-Amber))
Audit recommendations: High 1 Medium 2 Low 2 
The purpose of this audit was to provide assurance on adequacy and effectiveness of the
Council’s key controls and management arrangements associated with the process of
allocating Council houses and the extent to which the system and associated processes are
operating in line with approved Council policies.  As well as the administration of the ‘waiting
list’ and how applicants are offered housing, the review also covered how the Service manages
tenancy succession.
Based on the results of our work, we have assessed the audit as providing ‘reasonable
assurance’ as we have concluded that there is a generally sound control environment in place
although some issues and areas for improvement have been identified.  We were pleased to
note that the Council’s arrangements for the management of housing allocations, including
management of the waiting list, making housing offers and assessing applications for tenancy
succession are generally being conducted in line with approved Council policies. 
Recommendations for management consideration/action are detailed at Section 3 of the report
and include:
• There is an urgent need to review current users and user access privileges to the
Common Housing Register (CHR) system and to undertake such reviews on a regular
basis thereafter;
• Although we found no evidence of inappropriate allocation decisions, there is a need to
record the rationale more clearly for both the waiting list and applicant selected when an
offer is made to an applicant who is not top of the selected waiting list to increase
transparency and to enable the Service to better demonstrate that decisions made were
appropriate; and
• There is a need for the Service to review that key controls for checking applications input
to the system and validity of supporting documentation provided are operating
appropriately.
Satisfactory management responses including agreed proposed actions have been received
from management in response to the recommendations contained in the report. 
Page 53 of 240

Page 58

Appendix 1 (continued)
Summary of Internal Audit assignments completed in the period
Internal Audit outputs: Audit opinion and commentary
3 Council’s counter-fraud arrangements
Internal Audit Opinion:    Reasonable assurance (Green-Amber)
Audit recommendations: High 0 Medium 3 Low 0 
In line with the Internal Audit Charter and to ensure the independence of the Internal Audit
function when reviewing an activity for which the Chief Officer (Audit and Risk) also has line
management responsibility, this work was led by the Principal Auditor and planned and
conducted without the involvement of the Chief Officer (Audit and Risk) (who instead assumed
the role of client during the audit process).
The purpose of this audit was to provide assurance on the adequacy and effectiveness of the
Council’s Anti-Fraud Policy and management arrangements for the prevention and detection
of fraud to identify any actions necessary to update the policy and ensure that the Council’s
arrangements are consistent with recognised good practice.  Work undertaken included
consideration of the Council’s anti-fraud arrangements against a good practice checklist
developed from a range of sources, including the CIPFA Code of Practice on Managing Risk
of Fraud and Corruption and Fighting Fraud and Corruption Locally – A Strategy for the 2020s
as well as an update and refresh of the Anti-Fraud Policy, including a change of title to Counter
Fraud Policy.  The updated Counter Fraud Policy will be submitted to the Policy and Strategy
Committee for approval in September.
Based on the results of the work undertaken, we have categorised this audit as offering
‘reasonable assurance’ meaning that we consider that the Council’s arrangements are
generally aligned with good practice as responsibility for ensuring that risks of fraud and
corruption are managed effectively has been acknowledged and is embedded in the Council’s
governance arrangements, a risk management framework is in place, which includes a
corporate risk for ‘serious organised crime, fraud or corruption’ and there is an approved Anti-
Fraud Policy in place which details the Council’s attitude to fraud and its approach to the
prevention, detection and investigation of fraud across all of the Council’s service areas.
We have, however, identified a small number of areas for improvement to better align the
Council’s counter fraud arrangements with good practice and our recommendations are
detailed at Section three of this report.  These include:
• There is no dedicated counter fraud resource, counter fraud plan or annual counter fraud
report and fraud work undertaken is generally reactive rather than proactive;
• There is scope for improvement in the consideration and inclusion of fraud risks in Service
Risk Registers and reporting on recognised fraud risk; and
• There is a lack of awareness raising in relation to fraud risks and how these can be
prevented, detected and reported.
Satisfactory management responses including agreed proposed actions have been received
from management in response to the recommendations contained in the report. 
Page 54 of 240

Page 59

Appendix 1 (continued)
Summary of Internal Audit assignments completed in the period
Internal Audit outputs: Audit opinion and commentary
4 Procurement – achieving best value
Internal Audit Opinion:    Reasonable assurance (Green-Amber))
Audit recommendations: High 0 Medium 2 Low 2 
The purpose of this audit was to provide assurance on the Council’s procurement
arrangements, particularly in relation to contracts awarded on the basis of single tender
responses.  The Audit and Scrutiny Panel specifically requested that this work be undertaken
following several elected members expressing concerns over an apparent increase in the
number of reports to Committees awarding, or seeking approval to award, contracts where
there has only been a single tender response, with consequential concerns about a lack of
competition, whether the Council is securing best value and the risk of anti-competitive
behaviour amongst potential bidders.
Based on the results of our work, we have categorised this audit as offering ‘reasonable
assurance’.  We noted that there are several different routes for procuring supplies, services
and works and are pleased to note that there are clear expectations and documented guidance
available to all Services undertaking procurement activity.
However, in response to the specific concerns raised by members regarding an apparent
increase in the number of contracts where there has only been a single tender response, our
review and analysis of performance information indicates that there is not a high incidence of
single tender responses.  However, we consider that the way in which procurement outcomes
are being reported could be misleading and therefore, understand why elected members have
raised concerns.  We have identified a number of areas where we consider that there is scope
for improvement, and these are contained in section 3 of this report. 
These include:
• ‘below threshold’ reports to committee should be amended to more clearly convey the
level of competition and how best value has been achieved;
• key procurement documentation and reports for contracts awarded need to better convey
how best value has been achieved; and
• performance information in relation to procurement activities could be improved.
Satisfactory management responses including agreed proposed actions have been received
from management in response to the recommendations contained in the report. 
Page 55 of 240

Page 60

Appendix 2  Audit Gradings
Audit reports are graded with an overall assurance opinion, and any issues and associated
recommendations are classified individually to denote their relative importance, in accordance
with the definitions in the tables below. 
Definition of audit assurance and recommendation categories
Assurance Confidence based on sufficient evidence that internal controls are in place,
operating effectively and objectives are being achieved. 
Assurance opinion
Green Substantial
Assurance
There are minimal or minor control weaknesses that present
low risk to the control environment.  The control environment
has substantially operated as intended although some minor
errors have been detected. Very few or no improvements are
needed.
Green-Amber Reasonable
Assurance
There are some control weaknesses that present a low to
medium risk to the control environment.  The control
environment has mainly operated as intended although errors
have been detected.  Some improvements should be made.
Amber-Red Limited
Assurance
There are significant control weaknesses that present medium
to high risk to the control environment.  The control
environment has not operated as intended.  Significant errors
have been detected.  Substantial improvements should be
made.
Red No
Assurance
There are fundamental control weaknesses that present an
unacceptable level of risk to the control environment.  The
control environment has fundamentally broken down and is
open to significant error or abuse.  Immediate and major
changes need to be made. 
Organisational impact
Major
The weaknesses identified during the review have left the Council open to
significant risk.  If the risk materialises it would have a major impact upon the
organisation.
Moderate The weaknesses identified during the review have left the Council open to medium
risk.  If the risk materialises it would have a moderate impact upon the organisation.
Minor The weaknesses identified during the review have left the Council open to low risk. 
If the risk materialises it would have a minor impact upon the organisation. 
Recommendation priority
High
Significant control failure or weakness that, if not addressed, may lead to a major
financial, operational or reputational risk to the organisation and/or significantly
impact the successful delivery and achievement of the objectives of the area under
review.  Urgent/Immediate action is required.
Medium
Control failure or weakness that, if not addressed, may lead to a moderate financial,
operational or reputational risk to the organisation.  Weakness may be individually
significant but it is unlikely to affect the successful delivery and achievement of the
overall objectives of the area under review.  The risk of error would, however, be
significantly reduced if corrective action was taken.  Prompt action is required
Low
Control failure or weakness that may lead to a minor financial, operational or
reputational risk to the organisation.  Weakness does not appear to significantly
affect the ability to meet objectives.  Minor issue raised to improve the efficiency
and effectiveness of controls.
Page 56 of 240

Page 61

Appendix 3:  Internal Audit performance framework
Category Measure Internal Audit
management
Reported to
Chief Executive
and CMT
Reported
to A&SP
(Quarterly)
Reported to
A&SP
(Annual)
1. Delivery of Annual Plan Percentage completion of agreed plan X X  X
2. Targeting Percentage of key corporate risks and key financial
systems over which assurance provided X X  X
3. LGBF - Efficiency Cost of Internal Audit per £ million revenue budget X   X
4. LGBF - Efficiency % of productive hours delivered v Plan X   X
5. Delivery /
recommendations
Percentage implementation of agreed actions by
implementation date (cumulative year to date) X X X X
6. Delivery / other Number of significant irregularity / fraud investigations X X  X
7. Customer satisfaction
results
Scores from customer satisfaction questionnaires (audit
assignments) (cumulative year to date) X X X X
8. Customer satisfaction
results
Scores from key stakeholders (CMT and A&SP)
questionnaires (overall performance of the function) X X  X
9. Quality / standards Reliance placed by External Audit on the work of Internal
Audit X X  X
10. Quality/ standards Quality review outcomes – EQAR or internal self-
evaluation X X  X
11. Delivery of Annual
Report Annual opinion /report prepared by 31 May annually X X  X
12. Targeting Approval by CMT and A&SP of strategy and annual plan
by 31 May annually X X  X
Internal management performance indicators
13. Efficiency Actual v planned days on completed assignments X   
14. Efficiency Time between completion of fieldwork and draft reports
being issued 
X   
15. Efficiency Time between draft reports and final reports being issued X    Page 57 of 240

Page 62

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0800.2023.001 - Follow Up Waste and Fleet Investigation/A - Findings and Report/A10 20230717
Waste and Fleet Final Report v1.0 as issued.docx 1 
INTERNAL AUDIT REPORT 
FOLLOW UP OF INVESTIGATION OF STAFFING ISSUES WITHIN
WASTE AND FLEET RESOURCES 
Contents  
1. Executive Summary 2. Summary of New Findings and Recommendations 3. Action Plan
Appendix 1:   Audit grading Appendix 2: Progress of Actions Against Previous Recommendations 
Issued to: Chief Officer (Community Operations) and Chief Officer (People Resources) 
Copied to: Chief Executive and Deputy Chief Executive 
Headlines
The purpose of this audit was to provide independent assurance that management actions agreed in response
to the February 2022 Internal Audit report on staffing/overtime issues within Waste and Fleet Resources have
been progressed in line with agreed timescales and that key weaknesses have been addressed.
In response to the issues raised in the February 2022 report, the Service prepared an action plan detailing the
recommendations from the initial audit report and identifying responsible officers and the actions required to
address the recommendations.  This action plan was discussed and monitored at management meetings and
was updated on an ongoing basis to reflect progress.
From our testing, we were pleased to note that the majority of the management actions agreed in response to
the previous audit report and included in the resultant action plan have been progressed.  However, after
reviewing the actions taken by management, we have concluded that many are, as implemented, not sufficient
to effectively address the weaknesses previously identified and demonstrate that staff involved may not have
given sufficient consideration to some of issues raised in the initial report and/or nature of the improvements
required.  We have therefore, categorised this audit as offering ‘limited assurance’ as we consider that there
remain significant gaps and/or weaknesses in the control environment and instances of non-compliance with
expected procedures which we consider require to be urgently addressed by management.
Most significant, are the need to ensure compliance with all key corporate expectations within recruitment
processes, including in respect of successful candidates meeting essential criteria for specific roles, the need
to establish a staffing structure which meets the requirements of the Service whilst minimising overtime levels,
and that the Service regularly fails to comply with corporate expectations surrounding payments to staff and/or
routinely has to resort to using enhanced rates to deliver core services and without appearing to exercise proper
control over the use of such payments.  As a result of the additional findings identified during this audit, we
have raised several new recommendations, which are detailed in section 3 of this report.  These supersede
the recommendations made in our previous audit report. 
It should be noted that the relevant senior managers, Chief Officer (Community Operations) and Chief Officer
(People Resources), disagree with Internal Audit’s assessment of ‘limited assurance’ and consider that the
audit opinion over-emphasises the significance and/or severity of the issues identified and that the findings
raised do not create or represent major financial, operational or reputational risks to the Council.  However,
Internal Audit consider the assessment appropriate and the content of the report sets out our rationale for the
stated audit opinion. 
Internal Audit Opinion (see definition at Appendix 1) Limited assurance (Amber-Red) 
Organisational impact (see definition at Appendix 1) Moderate 
Report status FINAL Audit ref 0800/2023/001 Date Issued 18/07/23
Audit Team Lesley Armstrong, Paula Hendry and Jackie Struthers Page 58 of 240

Page 63

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0800.2023.001 - Follow Up Waste and Fleet Investigation/A - Findings and Report/A10 20230717
Waste and Fleet Final Report v1.0 as issued.docx 2 
1.  Executive Summary 
1.1 Background
1.1.1 In February 2022, Internal Audit reported findings in response to concerns identified during a previous
payroll audit within Waste and Fleet Resources where cumulative overtime for some employees
appeared excessive and potentially indicative of control weaknesses and/or irregularities, and which we
considered warranted further investigation.
1.1.2 The review identified a number of significant failures by Service management in a number of related
processes including ensuring that overtime claims were properly checked/verified to confirm they were
valid and accurate prior to authorisation and in relation to the implementation of some of the Council’s
expected HR and recruitment processes, which were not always implemented in a manner consistent
with the relevant corporate policy.  The most significant of these issues included management being
aware of the high levels of overtime being worked but appearing to take no formal action to address this
issue.  We also noted anomalies in the appointment of staff prior to all pre-employment verification checks
being completed and a contract being issued, and a significant number of potential errors in pay from our
review of a relatively small sample of employees (e.g. non-core hours and contractual overtime) which
we considered may be indicative of weaknesses in the Service’s approach to managing additional
payments to employees.
1.1.3 The initial audit report was included in the Internal Audit progress report presented to the Audit and
Scrutiny Panel meeting in March 2022, at which members requested a formal follow-up be undertaken
by Internal Audit to provide assurance that all agreed management actions were progressed in line with
agreed timescales and that the identified weaknesses had been addressed.  This report represents the
findings from the follow-up work undertaken. 
1.2 Action taken by Service
1.2.1 Service management responded positively to the initial audit report and committed to clear management
actions to address the recommendations outlined in the report.
1.2.2 The Service prepared an action plan, detailing the recommendations from the initial audit and identifying
the actions required to implement the recommendations, and responsible officers.  We were informed
that this action plan is discussed and monitored at management meetings and updated on an ongoing
basis.
1.2.3 The action plan contains comments which indicate the progress of each action identified and, based on
the Service’s monitoring of implementation of the actions identified, the Service considers that all but two
actions are complete.  The two remaining actions relate to addressing the over/underpayments identified
in Appendix 2 of the initial report and implementation of processing overtime through MySelf.
1.2.4 Details of the actions taken against each of the recommendations arising from our earlier report, together
with our assessment on the adequacy and effectiveness of the actions taken are detailed at Appendix 2
of this report. 
1.3 Internal Audit Assessment of Action taken by Service
1.3.1 Testing for this audit involved discussions with the Business Manager (Waste and Fleet), Performance
and Compliance Manager, HR Business Partner and Support Services staff as well as reviewing the
action plan, obtaining appropriate documentation to support actions taken, confirming whether the issues
raised in Appendix 2 of the original report had been actioned and undertaking checks on payments made
to a further sample of employees within the Service.
1.3.2 From our testing, we were pleased to note that the majority of the management actions as stated in the
initial report have been progressed, however, on reviewing the adequacy and effectiveness of these
actions, we consider that many are, as implemented, not sufficient to address the underlying weaknesses
identified and demonstrate that staff involved may not have given sufficient consideration to some of
issues raised in the initial report and/or nature of the improvements required.  Most significantly is the
ongoing failure by Service management to ensure that recruitment processes undertaken are consistent
with corporate policy and that the Service appears to regularly fail to comply with corporate expectations
surrounding payments to staff and/or routinely has to resort to using enhanced rates to deliver core
services and without appearing to exercise proper control over it.
1.3.3 As a result, we have raised further findings and recommendations, which are detailed the action plan
contained in section 3 of this report.  Page 59 of 240

Page 64

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0800.2023.001 - Follow Up Waste and Fleet Investigation/A - Findings and Report/A10 20230717
Waste and Fleet Final Report v1.0 as issued.docx 3 
2.  Summary of New Findings and Recommendations 
Number and category of recommendations raised
(see definition of priority at Appendix 1) 
High Medium Low
2 1 1 
Key areas requiring management action (High)
The following key areas requiring urgent management action have been identified:
• The Service need to ensure compliance with all key corporate expectations within recruitment processes,
including in respect of successful candidates meeting essential criteria for specific roles;
• There continues to be significant weaknesses in the controls used within the Service for managing and
processing contractual and non-contractual payments. 
Other areas for improvement (Medium)
Another area for improvement was also identified:
• The Service needs to ensure that the impact of structure changes in reducing overtime paid at premium
rates is monitored and consideration as necessary to further amendments and/or actions to reduce this. 
Page 60 of 240

Page 65

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0800.2023.001 - Follow Up Waste and Fleet Investigation/A - Findings and Report/A10 20230717 Waste and Fleet Final Report v1.0 as issued.docx
4
3. Action Plan Follow Up of investigation of staffing issues within Waste and Fleet Resources 0800/2023/001 
Ref Finding
1 The Service needs to ensure compliance with all key corporate expectations within recruitment processes, including in respect of
successful candidates meeting essential criteria for specific roles. 
During our previous audit, we identified an employee who had been recruited to a post for which he did not hold the relevant essential qualifications and commenced the role
prior to pre-employment verification checks being completed and verified by the Recruitment team.  Management subsequently withdrew the offer and agreed to remind staff
of the need to fully comply with the Council’s recruitment policies and procedures and committed to seeking clarification to ensure that candidates shortlisted for interview meet
the essential qualification requirements.
In response to this commitment, the Service issued an email in March 2022 to all managers and staff involved in recruitment, advising that recruitment should be carried out in
line with the Recruitment Policy and providing a link to the Policy on MyNL.  We consider that this email does not provide sufficient information in relation to corporate
expectations during recruitment processes as it only provides a link to the Recruitment Policy and does not specifically refer to the detailed process to be followed when ensuring
that essential qualifications are held prior to inviting candidates for interview or advise recruiting managers to seek advice if it is unclear whether the qualifications held by
individual candidates meet the essential qualification requirements.
As a result of our work during this audit, we consider that there remains some dubiety by the Service over equivalent qualifications and there is very little evidence that, where
these are not clear, confirmation is sought prior to interview to ascertain that the relevant qualifications are held by all candidates selected for interview.  Review of employee
specifications for recent recruitments confirmed that there is a requirement that generally, for NLC9 and NLC10 posts, an HNC or equivalent is held and for posts graded at
NLC12 and above, a degree or equivalent is held.  We noted, however, that the qualifications held by many of the Waste staff in these promoted posts are CMI (Chartered
Management Institute) qualifications which, as confirmed by the Talent and Organisational Development Team within People Resources, are not equivalent to an HNC or
degree (in line with Scottish Credit and Qualifications Framework (SCQF) tables). 
We selected a sample of four recent recruitments within Waste (Recruitments A, B, C and D) and reviewed relevant recruitment documentation to confirm whether each of the
successful candidates held appropriate qualifications in line with those stated in the employee specification.  We noted that two of the four successful candidates (Recruitments
B and D) do not hold the required essential qualifications. 
In reviewing the sample of recruitments, we identified a number of other anomalies that are indicative of this Service failing to adhere to and/or comply with corporate
expectations and the principles of fairness, consistency and transparency. This includes:
• For one of the recruitments (Recruitment B), the successful candidate did not provide a sufficient work history (from 12/07/21 only and little reference to waste and fleet
experience) in their application form but for another post, one candidate was rejected at the shortleeting stage and not taken forward to interview as it was deemed that their
work history was limited to one job (note - this covered a 13-year period) and they had zero waste experience.  This suggests that there is inconsistent treatment of applicants
during the shortleeting process;
• Recruitment A was undertaken in May 2022 with Recruitment B taking place in September 2022.  The successful candidate for Recruitment B provided a reference for the
successful candidate for Recruitment A, who was subsequently part of the interview panel for Recruitment B.  The post for Recruitment B reports to the post for Recruitment
A.  Whilst we appreciate given the management hierarchy it is important that the postholder from Recruitment A be involved in the selection process for Recruitment B, there
appears to be a potential conflict of interest for the postholder of recruitment A.  This conflict does not appear to have been declared and as such consideration and
implementation of appropriate actions to mitigate this potential conflict do not appear to have been taken.  This highlights significant concerns on the validity and transparency
of the recruitment process for Recruitment B and what appears to be an undeclared potential conflict of interest; and
• A further three employees who were recently promoted to Supervisors (Waste management) who did not hold the required essential qualifications.  The offer of employment
letter for each of these employees specifically states that the appointment is subject to undertaking and successfully obtaining an HNC or equivalent qualification within 12
months, that as this is an essential criterion for the post, they must submit proof of the qualification within the stated timescale and that failure to obtain the qualification will
result in the offer of employment being revoked.  Two of the three employees were due to undertake a CMI level 3 qualification, but this was on hold as they may move to
SVQ3 (equivalent to HNC) and one had commenced the SVQ3 but has subsequently withdrawn.  The latter remains in the Supervisor post and is in fact, currently being paid
higher duties at an NLC10 post.  We would question whether they can be deemed appropriately qualified for this higher graded post when they haven’t achieved the minimum
qualification requirements for the NLC9 post.  Additionally, we found no evidence that, having withdrawn from the qualification, management have considered arrangements
for moving them back to their original post in line with proviso included in the offer of employment letter.
(continued overpage)   Page 61 of 240

Page 66

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0800.2023.001 - Follow Up Waste and Fleet Investigation/A - Findings and Report/A10 20230717 Waste and Fleet Final Report v1.0 as issued.docx
5
3. Action Plan (continued) Follow Up of investigation of staffing issues within Waste and Fleet Resources 0800/2023/001 
Implication Recommendation Priority
Recruitment processes may
not be compliant with
corporate expectations.
Staff may be recruited to
posts which they are not
suitably qualified for which
could affect Service
operations and could have an
adverse effect on the
Council.
The Chief Officer (Community Operations) should:
(1) in consultation with the Talent and Organisational Development Team, prepare and issue formal guidance on essential
qualification requirements, which indicates the types of qualifications that meet these requirements and which advises that
where there is dubiety over specific qualifications, advice should be sought from the Talent and Organisational Development
Team prior to confirming the list of interviewees;
(2) in consultation with People Resources ensure that specific and targeted recruitment training is devised for this Service area
which includes specific reference to essential qualification requirements and the formal documentation prepared above; and
(3) undertake checks on a sample of recruitments to ensure that the Council’s policies and expectations have been adhered to
and that the successful candidate holds the essential qualifications for the post, prior to the contract being issued. 
High
Management response Implementation
Month/Year
(1) Partly Agree
Chief Officer (Community Operations) and Chief Officer (People Resources)
Given the number of qualifications available, it is not considered logical to prepare and issue guidance indicating the types of qualification which meet the essential
job requirements.  Instead, where there is dubiety over the level of qualification stated by applicants, all staff involved in recruitment will be instructed to contact the
People Resources prior to selecting candidates for interview to ascertain whether the stated qualifications are equivalent to those required by the essential criteria.
It is accepted that in some previous cases, and as stated in the finding, there have been some candidates presenting for interview and being successful in gaining
the post who do not have the academic qualifications associated with NLC9, 10 or 12 posts.  However, it is considered that when assessing competency for a
management post within a large front-line service and in such a competitive recruitment sector, the current recruitment policy, which puts significantly more emphasis
on academia over experience, does not necessarily aid the Service to select the best candidate for the post and can lead to no-one being recruited.  As Chief Officer,
I have a has a duty of care to the current management team to ensure the Service does recruit the best candidate for the post as in the absence of this we would
either not recruit anyone due to the competitive market or indeed recruit the wrong person – and either outcome would place a significant strain on the existing
management team and have a negative impact on the outcomes for the Service.
This has now been recognised at a corporate level and Council is now moving toward becoming an accredited Inclusive Recruiter which will see full adoption of the
SCQF framework and allow the Council to recognise both experience and equivalent qualifications in operational services such as Waste and Fleet.  A report has
been prepared and will be presented to a forthcoming meeting of the CMT for approval.  Following this approval, a trial for specific hard to fill roles will be undertaken
before this is rolled out across all Council Services.
In the absence of any formal policy being in place at present and to provide assurance that proper consideration is being taken to any ‘equivalency’ decision, the
appropriate Business Manager shall, in discussion with an appropriate member of the TOD team, consider any such request and in the absence of any agreement
with this this will be escalated to the Chief Officer who will undertake a final decision following guidance from the TOD team.
(2) Agree
Chief Officer (Community Operations)
A programme of refresher training for all staff engaged in recruitment will be introduced and completed by the end of December 2023.
(continued overpage) 
December 2023 
December 2023 
Page 62 of 240

Page 67

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0800.2023.001 - Follow Up Waste and Fleet Investigation/A - Findings and Report/A10 20230717 Waste and Fleet Final Report v1.0 as issued.docx
6
3. Action Plan (continued) Follow Up of investigation of staffing issues within Waste and Fleet Resources 0800/2023/001 
Management response Implementation
Month/Year
(3) Agree
Chief Officer (Community Operations)
Random samples will be checked by the Service’s Performance and Compliance Team and appropriately recorded. However, if matters are found to have been
addressed by the next audit, this further layer of check will be removed.
Note: The Service consider that the priority rating for this recommendation should be ‘Medium’ rather than ‘High’.  However Internal Audit is content that the
assessment is appropriate.  The assessment of the recommendation as ‘High’ is informed by the findings representing a clear deviation from existing corporate
policies, expectations and work practices in relation to recruitment and despite a commitment from management to address these issues which were identified in an
earlier audit, further similar issues were identified during this follow-up exercise. 
June 2023  
Page 63 of 240

Page 68

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0800.2023.001 - Follow Up Waste and Fleet Investigation/A - Findings and Report/A10 20230717 Waste and Fleet Final Report v1.0 as issued.docx
7
3. Action Plan (continued) Follow Up of investigation of staffing issues within Waste and Fleet Resources 0800/2023/001 
Ref Finding
2 There continues to be significant weaknesses in the controls used within the Service for managing and processing contractual and
non-contractual payments.
As part of the earlier review, we undertook a review of contractual and non-contractual payments made to a sample of employees within Waste and Fleet and identified a
number of issues with non-core hours and overtime payments.  Management was advised of the issues identified and agreed to review these issues and undertake a review
of any regular payments made to waste and fleet staff, taking appropriate action to resolve any issues identified.  A report of all non-core hours and contractual overtime
payments made to waste and fleet staff was obtained and reviewed by the HR Business Partner, with a number of queries and potential errors notified to the Employee Service
Centre, who have since reviewed and provided comments to the HR Business Partner.  
Despite a commitment timescale of March 2022, the notification to ESC was not undertaken until November 2022 and to date, relatively few of the errors have been addressed. 
We understand that the HR Business Partner advised ESC to wait until a wider issue relating to the interpretation of non-core hours was resolved prior to taking action, however,
we consider that the issue relating to non-core hours within Waste relates to the use of incorrect work patterns to calculate non-core hours rather than the wider issue which is
subject to ongoing discussion at present.  Additionally, many of the specific issues identified and reported in our previous report have not yet been actioned, with many of the
outstanding issues likely to result in ongoing overpayments.  We consider that the longer the issue remains outstanding, the higher any overpayments and the less likelihood
of recovery.
Given the number of issues identified in our previous review, we undertook sample checking of contractual and non-contractual payments made to waste and fleet employees
and again identified further issues. These issues, together with the outstanding issues from the previous audit have been provided under separate cover, however, examples
of the issues arising are as follows:
• employees who provide cover for a higher-graded post receive an hourly difference payment to compensate for the difference in salary and if applicable, an overtime element
to cover the contractual overtime payment due.  When the higher graded post is advertised, if the successful candidate is the employee who provided cover during the
vacancy, the start date is often backdated which results in the basic pay and contractual overtime (if applicable) elements of the post being backdated to the start date,
resulting in effectively double payment of each aspect;
• we identified three employees who were promoted to a supervisor post from August 2022 which was not actioned on iTrent until September 2022 and for which the contractual
overtime element was not applied until January 2023.  As each employee was in receipt of hourly difference and the contractual overtime element until the new post was
actioned on iTrent, they were in fact paid twice (for almost two months for hourly difference and five months for contractual overtime).  Whilst the overpayment of hourly
difference is often identified and corrected by Payroll staff (although not always), the contractual overtime element is not, as Payroll staff would not be aware that overtime
paid related to this;
• there are inconsistencies in the contractual overtime element (paid as 0.58 per day and 0.5 on Sunday) claimed and paid for employees acting up, and working overtime as
Supervisors, as timesheets for the period January to August 2022 record overtime of 1.19 hours per day and from August to November 2022 record 0.58 for a Sunday when
only 0.5 hours should be claimed;
• there are also inconsistencies in the overtime claimed and paid by Supervisors and Assistant Operations Managers working additional shifts, with some employees claiming
the usual shift hours (10.66 hours or 10 hours on Sunday) whilst others claim the usual shift plus the contractual overtime element (11.24 hours).  Assistant Operations
Managers (NLC10) are not entitled to contractual overtime; and 
• our review of the overtime reports identified that three senior managers currently receive a regular non-core hours payment (of 15 hours per four weeks) for working one
weekend day over each two-week period.  Review of a report from iTrent which details employees graded NLC13 or above who are in receipt of non-core hours identified
only one other employee, graded NLC15, who is in receipt of non-core hours.  We would query whether there is a service requirement for these managers to work weekends
given the other sufficient management tiers who should be able to deal with any issues that may arise. 
(continued overpage)  
Page 64 of 240

Page 69

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0800.2023.001 - Follow Up Waste and Fleet Investigation/A - Findings and Report/A10 20230717 Waste and Fleet Final Report v1.0 as issued.docx
8
3. Action Plan (continued) Follow Up of investigation of staffing issues within Waste and Fleet Resources 0800/2023/001 
Ref Finding
2 (Continued from previous page)
We also identified that one of the employees who was promoted to Supervisor in August 2022 had various anomalies in his pay, arising from both the issues identified above
and further issues.  Payroll staff have only recently been provided with the appropriate documentation and, through a manual check on payments made and due, have identified
this this employee has a net overpayment of approximately £2,500.  The additional issues which created this overpayment are as follows:
• Soon after the employee was promoted to the NLC9 Supervisor post, he began ‘acting up’ to an NLC10 post for which he received both hourly difference and higher duties
payments (for undertaking a post at a higher grade) for three weeks, resulting in a double payment.  
• The employee has been in receipt of higher duties payments at NLC10 since September 2022.  The higher duties forms completed and authorised by the Operations
Manager and HR Business Partner state that he is covering for a vacant post, however, all three posts at that grade are filled.  The HR Business Partner advised that he is
undertaking a project at that grade and that his had been approved by the Chief Officer.  No documentation was provided to support this, and we were not advised of an end
date.  The higher duties forms completed, therefore, do not accurately and transparently reflect the reasons for undertaking higher duties; and
• A request for a salary advance, submitted by the HR Business Partner and authorised by the Chief Officer, to cover higher duties claims which were not submitted on time
and an overpayment which he considered was deducted from his pay in error was received and processed by Payroll staff.  We were informed that salary advances are
normally only paid for issues relating to basic pay and not for overtime or additional payments. The advance has not yet been repaid.
The findings detailed above indicate that the Service appears to regularly fail to comply with corporate expectations in relation to payments to staff, there appears too much
flexibility/deviation from standard practice and/or the Service routinely has to resort to using enhanced rates to deliver core services without have appropriate monitoring and
oversight, awareness and understanding over payments made. 
Checks on the other employees affected by the issues highlighted above have not yet been undertaken by Payroll staff.  
Implication Recommendation Priority
A lack of documentation to clearly support the reasons for staff
undertaking higher duties, claims for higher duties payments may
be authorised inappropriately and staff could receive payments
which they are not entitled to and this could lead to increased costs
for the Council.
Failure to apply conditions of service appropriately could lead to
inconsistency of employee payments across both the Service and
the Council.
If errors are not stopped immediately when they are first identified,
any overpayments arising from the error could continue to increase
and the likelihood of recovery could be reduced.
Delays in employees agreeing and signing repayments schedules
for overpayments could lead to a delay in recovery and increase the
risk of the overpayment not being recovered if the employee were
to leave the Council’s employment.
The Chief Officer (Community Operations), in conjunction with the Chief Officer (People
Resources), should:
(1) ensure that HR Business Partners, prior to authorising and passing higher duties claims for
payment, properly scrutinise and understand the appropriateness of such claims, confirm
that claims have been agreed and authorised by the Chief Officer or senior management
and ensure that documentation accurately reflects the reason for such payments;
(2) review, and take appropriate action, to resolve the issues and errors in contractual and non-
contractual payments identified by Internal Audit and outlined in the document which has
been provided under separate cover;
(3) identify other employees who may be affected by the issues identified in the finding above,
with a view to review and taking appropriate action to resolve any subsequent issues/errors
identified; and
(4) ensure that where overpayments arise from these reviews, prompt action is taken to ensure
that appropriate repayment schedules, with reasonable terms, are promptly agreed with
relevant employees and that recovery commences as soon as possible.
High 
Page 65 of 240

Page 70

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0800.2023.001 - Follow Up Waste and Fleet Investigation/A - Findings and Report/A10 20230717 Waste and Fleet Final Report v1.0 as issued.docx
9
3. Action Plan (continued) Follow Up of investigation of staffing issues within Waste and Fleet Resources 0800/2023/001 
Management response Implementation
Month/Year
Agree 
(1) Chief Officer (Community Operations)
The HR Business Partner, in conjunction with the Chief Officer (Community Operations), will ensure that appropriate scrutiny of higher duties payment requests is
undertaken and will have due regard to the overall corporate review of this area currently being undertaken. 
(2) Chief Officer (People and Resources) and Chief Officer (Community Operations)
Work has commenced to check all non-core and contractual overtime payments for all employees within Waste and Fleet.  Work is also underway to identify and
recover any over or under payments for any employees impacted.  
(3) Chief Officer (People and Resources) and Chief Officer (Community Operations)
This would reflect the statement in (2) above.
(4) Chief Officer (People and Resources) and Chief Officer (Community Operations)
All overpayments will be addressed as a matter of priority. Work on the recovery of overpayments has commenced and the payroll team will ensure that all
anomalies raised from this audit will be reviewed and action taken as appropriate. Additionally, for relevant roles, the Waste Service have moved onto an electronic
overtime requesting process through MySelf. This should address manual issues identified with the current process for these roles with appropriate checking that
the details on the MySelf system are correct.
Note: The Service consider that the priority rating for this recommendation should be ‘Medium’ rather than ‘High’.  However Internal Audit is content that the
assessment is appropriate.  The assessment of the recommendation as ’High’ is informed by the scale of errors in employee payments identified in the original
audit, the lack of management action to correct these errors and/or to prevent them continuing/re-occurring and the identification of further significant errors during
this follow up exercise which have resulted in some large overpayments. 
September 2023 
June 2023 
June 2023 
September 2023 
Page 66 of 240

Page 71

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0800.2023.001 - Follow Up Waste and Fleet Investigation/A - Findings and Report/A10 20230717 Waste and Fleet Final Report v1.0 as issued.docx
10
3. Action Plan (continued) Follow Up of investigation of staffing issues within Waste and Fleet Resources 0800/2023/001 
Ref Finding
3 The Service needs to ensure that the impact of structure changes in reducing overtime paid at premium rates is monitored and
consideration as necessary to further amendments and/or actions to reduce this.  
We previously recommended that Service management should review current arrangements within Waste and Fleet Resources with a view to identifying the most cost-effective
solution which ensured that the required level and standard of service can be delivered whilst keeping overtime paid at premium rates to a minimum.  We advised that this may
require considering the roles of individual employees’, the hours and work patterns required to provide the service, the work undertaken and the remuneration to be paid and
whether staff are able to undertake the duties allocated to them within their contracted hours.
We confirmed that a new structure was approved in February 2022 and, at the time of testing, were informed that the final parts were being implemented with additional loaders
and drivers being processed by the Recruitment Team and that this should lead to a reduction in overtime due to fewer vacancies and fewer absences.  We noted that whilst
a new structure has been implemented within the Service, this has not yet been properly/accurately reflected in iTrent as some posts which have been removed from the
structure remain as vacant posts on iTrent and the job titles of some occupied posts on iTrent do not appear on the approved structure (e.g. Routing and Data Waste Officer). 
We consider that there is therefore a risk that posts which are not part of the approved structure (and for which there is therefore no budget) could be recruited for and filled.
From Comparison of spend on overtime in this Service following this restructure, against that in the year prior to the structure changes, identifies that the changes made have
not as yet resulted in a significant reduction in overtime being paid.  We recognise that there will always be a requirement for a certain level of overtime for front-line waste staff
(i.e. loaders and drivers) given that there is no ‘pool’ staff to cover unplanned absences and that without the appropriate level of staff, the required level of service cannot safely
be provided.  As this is the group of staff with the highest level of overtime, management reviews to reduce overtime have generally been concentrated here.  We consider,
however, that a review of the work patterns, hours, roles and levels of overtime for promoted staff (NLC9 and above) and staff within Fleet should be undertaken to determine
whether there is more efficient way to deliver the core service minimising the use of overtime and other payments paid at premium rates.  In this regard, we noted for example,
that the introduction of two Fleet Chargehands to assist the Fleet Co-ordinator has resulted in a reduction in the overtime claimed by the Fleet Co-ordinator, however, with two
additional staff now being paid and all three working the same work pattern and claiming overtime, often simultaneously for the same days/times, we consider that the new
staffing structure has not been always been effective in tackling and reducing overtime levels.
Implication Recommendation Priority
Services may not be delivered
in the most cost-effective
manner which could result in
additional costs to the Council
at a time of constrained
resources.
The Chief Officer (Community Resources) should:
(1) in conjunction with People Resources, ensure that the structure recorded on iTrent is up-to-date and accurately reflects the
approved current staffing structure and hierarchy;
(2) that a review of the work patterns, hours, roles and levels of overtime for promoted staff (NLC9 and above) and staff within
Fleet should be undertaken to determine whether there is more efficient way to deliver the core service which maintains the
required level and standards of service whilst minimising the use of overtime and other payments paid at premium rates; and
(3) ensure that the impact of structure changes in reducing overtime paid at premium rates is monitored and consideration as
necessary to further amendments and/or actions to reduce this.
Medium  
Page 67 of 240

Page 72

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0800.2023.001 - Follow Up Waste and Fleet Investigation/A - Findings and Report/A10 20230717 Waste and Fleet Final Report v1.0 as issued.docx
11
3. Action Plan (continued) Follow Up of investigation of staffing issues within Waste and Fleet Resources 0800/2023/001 
Management response Implementation
Month/Year
Agree
(1) Chief Officer (Community Operations)
The structure of iTrent will be updated to reflect the most recent restructure.
(2) Chief Officer (Community Operations)
Structure reviews are constantly undertaken within both the Waste and Fleet service and within the past four financial years, the Service has delivered £2.183M
of efficiency savings through effective management. I would agree with the necessity to have a constant review of structures to ensure operational and financial
efficiency and a further structural review is now being undertaken after the recent amalgamation of the former Environmental Asset and Regulatory Services
and Waste Solutions services into Community Operations.  Part of this restructure has been the establishment of the Fleet service under a dedicated Business
Manager. One of the first tasks of this manager will be to determine the best operating model for the Fleet service going forward and this will include a review
of the existing shift pattern etc.
(3) Chief Officer (Community Operations)
The nature of the service is such that any sickness or annal leave needs to be covered through overtime to ensure that operational requirements of the service
are met. This means there will always be a requirement within Waste and Fleet for Overtime.  To mitigate against this cost the service has now undertaken an
exercise to increase the pool of employee who drive to reduce the overtime levels.  Controls and measures are now in place with a standing 4 weekly meeting
to review overtime.  Additionally, the service is working with HR and finance colleagues on a traffic light system whereby the overtime rates are reviewed
weekly by service managers. We aim to have this implemented within the next 3 months.  The introduction of this traffic light system will assist with the
identification of any areas of ongoing high overtime and will be used as an indicator and trigger for considering any further amendments to the structure
(assessment of individual employees’ roles, hours and work patterns, duties and remuneration with consideration given as to staffing levels and whether staff
are able to undertake the duties allocated to them within their contracted hours). 
September 2023 
July 2023 
June 2023 
Page 68 of 240

Page 73

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0800.2023.001 - Follow Up Waste and Fleet Investigation/A - Findings and Report/A10 20230717 Waste and Fleet Final Report v1.0 as issued.docx
12
3. Action Plan (cont’d) Follow Up of investigation of staffing issues within Waste and Fleet Resources 0800/2023/001 
Ref Finding 
4 Some of the recommendation and management actions identified in the initial audit have not been adequately and/or effectively
implemented.
During the course of our work, we identified a number of other areas where we consider that the recommendation and/or agreed management action arising from the initial audit has
not been adequately or effectively implemented, as follows:
• The Service issued an email to all staff and managers involved in overtime advising that the Service was carrying out a review of overtime, a procedure would be issued and
highlighting the rules for payment of overtime above salary point 35.  We consider that this email does not provide sufficient information in relation to corporate expectations as it
fails to remind staff of the need to properly scrutinise and challenge overtime claims and ensure that they are satisfied that claims are accurate, in line with Council policy and
properly reflect additional time work prior to authorising them.  Additionally, given the delay in issuing the procedure, the email does not reflect any interim arrangements;
• The Performance and Compliance team are currently in the process of preparing a procedure for staff in relation to roles and responsibilities for claiming and authorising overtime. 
Given that the Service has only recently moved from recording overtime on timesheets with input to iTrent by the Support Team to employees directly recording their overtime on
Myself, this procedure is currently being prepared and has not yet been issued.   As a result, we have not yet had sight of the procedure and are therefore, unable to comment on
its adequacy and effectiveness;
• No independent review of overtime is undertaken after timesheets have been processed to ensure that they are accurate, however, sample checking by the Performance and
Compliance team, in conjunction with the Support Team, is now undertaken.  Review of this process appears satisfactory, however, it appears to concentrate on loaders and
drivers (whose overtime is recorded on a weekly timesheet which includes every member of the team) rather than all Waste and Fleet staff and does not take account of other
managers/staff who submit individual timesheets/overtime claims; and 
• We consider that there is scope for improvement in the way in which overtime sheets are held on Sharepoint.  We found it difficult to locate some overtime sheets as there is no
standard naming convention so that they are held in date order and some folders contained timesheets for a number of staff.
Implication Recommendation Priority Management response
Implementation
Month/Year
Failure to clearly inform and remind
staff and managers of the Council’s
conditions of service and corporate
expectations in relation to
recruitment, overtime and
contractual payments could lead to
inconsistency in payments made to
staff across the Council and
Service.
If regular independent reviews of
overtime and other contractual
payments made to staff are not
undertaken the Service will not be
able to promptly identify and action
any errors or common issues,
which could lead to fraudulent
claims, inconsistencies in
payments mane and therefore,
staff being under or overpaid.
The Chief Officer
(Community Operations)
should consider the
issues identified in the
finding above and take
appropriate action to
resolve them, ensuring
that the action taken is
effective and contributes
to reducing or removing
the risk that each issue
poses.
Low Agree
Chief Officer (Community Operations)
We have considered the issues raised in the finding above and commit to the following
actions:
• As we have now moved to an electronic method of recording and processing overtime
there should be no need to manually store any overtime sheets. However, it is accepted
that a scrutiny process must still be in place which provides assurance that all overtime
claimed has been worked and this will be devised and implemented by the Performance
and Compliance Team. One such example will be the introduction of retina/ fingerprint
recognition for all operatives which will provide evidence that any overtime claim can
be aligned to the recognition software for that day. Ideally, overtime should then only
be paid once this has been verified digitally but this will require our digital transformation
process to move at the same pace as the service; and
• Audits of overtime will be extended to cover all levels of staff – although this finding
must be caveated that only a couple of overtime reviews had been undertaken by the
time of the audit and there was no intention not to include higher grade claims within
the overall reviews. 
December 2023 
June 2023 
Page 69 of 240

Page 74

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0800.2023.001 - Follow Up Waste and Fleet Investigation/A - Findings and Report/A10 20230717
Waste and Fleet Final Report v1.0 as issued.docx 13
Appendix 1 - Audit Grading
Audit reports are graded with an overall assurance opinion, and any issues and associated
recommendations are classified individually to denote their relative importance, in accordance with
the definitions in the tables below. 
Definition of audit assurance and recommendation categories
Assurance Confidence based on sufficient evidence that internal controls are in place, operating
effectively and objectives are being achieved. 
Assurance opinion
Green Substantial
Assurance
A sound system of governance, risk management and control exists, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Green-Amber Reasonable
Assurance
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for improvement were
identified which may put at risk the achievement of objectives in the area
audited.
Amber-Red Limited
Assurance
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management and
control to effectively manage risks to the achievement of objectives in the
area audited.
Red No
Assurance
Immediate action is required to address fundamental gaps, weaknesses or
non-compliance identified. The system of governance, risk management and
control is inadequate to effectively manage risks to the achievement of
objectives in the area audited. 
Organisational impact
Major The weaknesses identified during the review have left the Council open to significant risk.  If
the risk materialises it would have a major impact upon the organisation as a whole.
Moderate The weaknesses identified during the review have left the Council open to medium risk.  If the
risk materialises it would have a moderate impact upon the organisation as a whole.
Minor The weaknesses identified during the review have left the Council open to low risk.  If the risk
materialises it would have a minor impact upon the organisation as a whole. 
Recommendation priority
High
Significant control failure or weakness that, if not addressed, may lead to a major financial,
operational or reputational risk to the organisation and/or significantly impact the successful
delivery and achievement of the objectives of the area under review.  Urgent/Immediate action
is required.
Medium
Control failure or weakness that, if not addressed, may lead to a moderate financial,
operational or reputational risk to the organisation.  Weakness may be individually significant
but is unlikely to affect the successful delivery and achievement of the overall objectives of the
area under review.  The risk of error would, however, be significantly reduced if corrective
action was taken.  Prompt action is required.  
Low
Control failure or weakness that may lead to a minor financial, operational or reputational risk
to the organisation.  Weakness does not appear to significantly affect the ability to meet
objectives.  Minor issue raised to improve the efficiency and effectiveness of controls. 
Page 70 of 240

Page 75

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0800.2023.001 - Follow Up Waste and Fleet Investigation/A - Findings and Report/A10 20230717 Waste and Fleet Final Report v1.0 as issued.docx
14
Appendix 2 – Progress of actions against previous recommendations 
Recommendation Management Response Action Taken
IA Assessment on Action Taken
Adequate Effective
Recommendation 1
Service management should review current
arrangements within Waste and Fleet
Resources with a view to identifying the most
cost-effective solution which ensures the
required level and standard of service can be
delivered whilst keeping overtime paid at
premium rates to a minimum.
This should also include consideration of
improvements to current monitoring
arrangements to enable prompt identification
of, and where appropriate action, in response to
any potential issues arising.
This may require clarifying the purpose of
individual employees’ roles, the hours and work
patterns required to provide the service, the
work undertaken and the remuneration to be
paid.  As part of any review, consideration may
be required as to whether staff are able to
undertake the duties allocated to them within
their contracted hours.
We are in the process of implementing a new
structure within Waste and Fleet Resources which
will reduce the need for overtime, particularly in
respect of the roles undertaken by the employee
referenced in this report.  This restructure will be
presented by the Head of Service to the Workforce
Steering Group on 18/02/22.
Through the Business Manager (Waste and Fleet)
there will be a regular review of overtime levels by the
Service’s senior management team. This will provide
information on the overall levels of overtime and
specifically those highest earners. This will in turn
prompt identification, and where appropriate action,
in response to any potential issues arising.
We will also undertake a review of the process to
authorise, monitor and highlight higher levels of
overtime across the service through the Performance
and Compliance Manager.  
Responsible Officer:  Business Manager (Waste
and Fleet) 
Timescale:  March 2022
A new structure was approved in February 2022. 
At the time of follow-up testing (November 2022),
the final parts were being implemented, with
additional drivers and loaders being processed by
the Recruitment Team, which in the Service’s
opinion should lead to a reduction in overtime due
to fewer vacancies and fewer absences.
The HR Business Partner advised that the new
structure was not necessarily designed to reduce
overtime but was more about how best to run the
Service and make it more efficient.  Other than
above, no confirmation was received on how the
new structure would reduce the need for overtime
for areas other than drivers and loaders.
Regular review of overtime is undertaken through
discussion at monthly senior management
meetings.  The Service receives fortnightly and
four-weekly overtime reports from iTrent and any
issues identified and considered for action. 
Meetings are not minuted, therefore we are
unable to confirm content of discussions.
No formal review of the overtime process has
been undertaken, however, the Service Manager
(Waste and Fleet) now countersigns all overtime
sheets (below SCP35) prior to being processed
by the Support Team.  Our review of a sample of
overtime claims between November and
December 2022 confirmed this.
The Performance and Compliance Manager
confirmed that she discusses overtime with the
Service Accountant and that there is an intention
to notify managers and the Support Team where
staff are reaching SCP35.
Yes – new
structure and
regular review of
overtime levels. 
No – review of
overtime process
No 
Page 71 of 240

Page 76

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0800.2023.001 - Follow Up Waste and Fleet Investigation/A - Findings and Report/A10 20230717 Waste and Fleet Final Report v1.0 as issued.docx
15
Appendix 2 (continued) – Progress of actions against previous recommendations 
Recommendation Management Response Action Taken
IA Assessment on
Action Taken
Adequate Effective
Recommendation 2
Service management should ensure
that managers/ supervisors
responsible for authorising overtime
claims are reminded of the need to
properly scrutinise and, where
appropriate, challenge overtime
claims prior to authorisation to
ensure that they are satisfied that
claims are accurate, appropriate, in
line with Council policy and properly
reflect additional time actually
worked.
On completion of the review detailed above,
procedures will be issued to all managers
and supervisors to ensure compliance with
Council policy with a request that all
appropriate managers complete and sign a
return sheet advising that they have read
and understand the overtime process.
Copies of claim forms will be held in a
central, secure area on SharePoint and
sampling of completed overtime sheets will
be carried out to ensure claims are
accurate.
Responsible Officer:  Business Manager
(Waste and Fleet) 
Timescale:  April 2022  
The Performance and Compliance Manager issued an email to all staff and
managers involved in overtime on 23/03/22 advising that the Service was
carrying out a review of overtime, a service procedure would be issued and
highlighting the rules for payment of overtime above SCP35.  
A draft procedure for overtime has been prepared but has not yet formally been
implemented.  The email was re-issued on 14/12/22 advising that the overtime
procedure had been drafted but will change significantly due to the move to
recording and authorising overtime via Myself and would be issued after this
process was in place. Update at March 2023 – the revised procedure reflecting
the move to Myself is still under development.
The email issued included a request for all recipients to complete a confirmation
record to confirm that they have been informed of, and understand, the
processes outlined in the email.  
A SharePoint area has been created for storing overtime claims and timesheets
have been copied across in bulk from the server with no amendment to names,
etc.
The Performance and Compliance Manager confirmed that senior management
has discussed her team undertaking sampling and reviews on overtime claims,
however, her staff do not have access to iTrent to undertake such checks and
she stated that overtime reports detail overtime cost whilst timesheets detail
hours.  Instead, one of the Performance and Compliance Officers selects a
sample of names and sits with the Support Team to review what has been
claimed and paid and prepare a report.  Two reports have been prepared to
date.
Yes  No 
Page 72 of 240

Page 77

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0800.2023.001 - Follow Up Waste and Fleet Investigation/A - Findings and Report/A10 20230717 Waste and Fleet Final Report v1.0 as issued.docx
16
Appendix 2 (continued) – Progress of actions against previous recommendations 
Recommendation Management Response Action Taken
IA Assessment on
Action Taken
Adequate Effective
Recommendation 3
Service management should ensure
that managers responsible for recruiting
staff are reminded of the Council’s
current recruitment policies and
procedures, including ensuring that
appropriate essential criteria are met
prior to selecting candidates for
interview, and that successful
candidates do not commence their new
role until the Recruitment Team have
confirmed that all pre-employment
checks have been completed and the
relevant contract has been issued.
Managers responsible for recruiting staff will be reminded of the
need to fully comply with the Council’s recruitment policies and
procedures. A copy of these will be provided to all managers
and similar to above, with a request that all appropriate
managers complete and sign a return sheet advising that they
have read and understand the recruitment process. 
In respect of qualifications, it should be noted that there are
many different qualifications across numerous bodies and
managers are not always clear which levels are equal to the
Scottish Credit and Qualifications Framework.  Going forward,
the Service will ensure that when undertaking recruitment
exercises, clarification will be sought, as necessary, from the
HR Business Partner Team to ensure that candidates
shortlisted for interview meet the essential qualification
requirements. 
Responsible Officer:  Business Manager (Waste and Fleet) 
Timescale:  April 2022  
The email that was issued to all managers and
supervisors also covers recruitment and includes a link
to the Recruitment Policy on MyNL.
The email issued included a request for all recipients to
complete a confirmation record to confirm that they have
been informed of, and understand, the processes
outlined in the email.  
The Service Manager (Waste and Fleet) confirmed that
checks on essential qualifications prior to the shortlisting
process is in place.  He advised that managers have a
list of SQA qualifications and equivalents and this is
checked as part of the interview shortlist process.  If a
manager is unsure whether a qualification meets the
essential criteria, they would contact the HR Business
Partner before the interview.
Yes No
Recommendation 4
Service management should review,
and take appropriate action, to resolve
the errors in the NCH and contractual
overtime payments identified by Internal
Audit and outlined in Appendix 2.
In addition, management should
undertake a detailed review of any
regular payments made to waste and
fleet staff to confirm the validity,
regularity and accuracy of these
payments in line with Council policies,
taking any required remedial action as
appropriate.
A review of all issues raised within Appendix 2 as well as any
regular payments made to waste and fleet staff will be
undertaken and the appropriate action taken in line with advice
from the HR Business Partner.
A revised process has already been put in place, with input by
one officer and check by line manager prior to overtime being
submitted.
Responsible Officer:  Business Manager (Waste and Fleet) 
Timescale:  March 2022  
No action appears to have been taken in response to the
issues raised in Appendix 2.  Our review of the issues
raised confirms that very few have been actioned, with
many of the actions which have potentially large
overpayments still outstanding.
The HR Business Partner obtained a report detailing all
non-core hours and contractual overtime payments for
employees in Waste and Fleet (up to NLC12). She
reviewed the report and notified the ESC of
queries/potential errors in November 2022.  No action to
correct the issues identified has yet been taken.
No No 
Page 73 of 240

Page 78

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0800.2023.001 - Follow Up Waste and Fleet Investigation/A - Findings and Report/A10 20230717 Waste and Fleet Final Report v1.0 as issued.docx
17
Appendix 2 (continued) – Progress of actions against previous recommendations 
Recommendation Management Response Action Taken
IA Assessment on Action
Taken
Adequate Effective
Recommendation 5
Service management should
remind all staff processing
overtime claims of the
importance of fully and
accurately recording overtime
information on iTrent and should
consider undertaking second
officer checks on a sample of
claims to confirm accuracy and to
enable identification of any
errors.
As mentioned previously, this process is now in place. 
However, it should be noted that staff system
permissions have only been changed recently to allow
this to happen.  Previously once overtime was keyed it
was no longer visible to anyone in the service to view
and carry out checks.  This was highlighted on
numerous occasions. 
Supervisors/managers have also been instructed to
ensure that all overtime is checked and accurate prior to
submitting to the Support Team for input.  Any changes
must be made by managers/supervisors and new
timesheet submitted.  Previously several changes were
notified by e-mail. 
In addition to the above, a random sample of 20
overtime sheets will be reviewed every quarter by the
Performance and Compliance team to provide further
assurance that the new process is working effectively.
Responsible Officer:  Business Manager (Waste and
Fleet) 
Timescale:  April 2022  
The Support Services Manager confirmed that second officer
checks for processing overtime are in place to ensure the
accuracy of recording overtime on iTrent.  These second
officer checks were previously not evidenced, however, the
Support Services Manager agreed during our discussion that
checking officer would also sign and date the overtime forms. 
This is now in place.
Both the Business Manager and Performance and
Compliance Manager stated that the importance of accuracy
of recording, authorising and inputting overtime claims was
included in the email issued by the Performance and
Compliance Manager on 23/03/22.  The Business Manager
also referred to him having oversight of the overtime claimed
through reviewing and signing all overtime claims.
Both the Business Manager and Performance and
Compliance Manager stated that the requirement to ensure
that any changes are submitted on a new updated
spreadsheet was in place.  However, the Support Team
confirmed that they do not request or receive updated
timesheets due to the tight timescales for processing overtime
and that queries are dealt with via a Teams call with the
Supervisor.  The Support Services Manager confirmed that in
future this would be done via email with a copy of the email
retained with the timesheet.
The Performance and Compliance Manager confirmed that
senior management has discussed her team undertaking
sampling and reviews on overtime claims, however, her staff
do not have access to iTrent to undertake such checks and
she stated that overtime reports detail overtime cost whilst
timesheets detail hours.  Instead, one of the Performance and
Compliance Officers selects a sample of names and sits with
the Support Team to review what has been claimed and paid
and prepare a report.  Two reports have been prepared to
date.
Yes – reminding
staff 
No – checks on
sample claims
No 
Page 74 of 240

Page 79

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0800.2023.001 - Follow Up Waste and Fleet Investigation/A - Findings and Report/A10 20230717 Waste and Fleet Final Report v1.0 as issued.docx
18
Appendix 2 (continued) – Progress of actions against previous recommendations 
Recommendation  Management Response Action Taken
IA Assessment on
Action Taken
Adequate Effective
Recommendation 6
Service management should ensure that appropriate
processes and procedures are put in place for the
retention of documentation to support payroll
payments.  
This should include ensuring that documentation is
appropriately filed for easy access should the need for
review arise and retaining the documentation for an
appropriate period, in line with Council’s records and
information management policy and relevant
retention schedules.
As detailed in 2 above, documentation will be held
electronically in secure Sharepoint area.  This will
ensure compliance with retention schedules.
Responsible Officer:  Business Manager (Waste
and Fleet) 
Timescale:  April 2022  
This is covered at recommendation 2 above. N/A N/A 
Page 75 of 240

Page 80

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0650.2023.001 - Housing Allocations/A - Findings and Reports/A07a 20230811 Housing
Allocations Final Report v1.0 .docx  1 
INTERNAL AUDIT REPORT 
HOUSING ALLOCATIONS 
Contents  
1. Executive Summary 2. Findings and Recommendations 3. Action Plan
Appendix 1:   Audit grading  
Issued to: Chief Officer (Housing Management)  Copied to: Performance and Improvement Manager, Chief
Executive and Deputy Chief Executive 
Headlines
The purpose of this audit was to provide assurance on adequacy and effectiveness of the Council’s key controls
and management arrangements associated with the process of allocating Council houses and the extent to
which the system and associated processes are operating in line with approved Council policies.  As well as
the administration of the ‘waiting list’ and how applicants are offered housing, the review also covered how the
Service manages tenancy succession (where, upon the death of a tenant, the property is re-allocated to an
individual currently residing at the property).
With a stock of over 35,000 houses, the Council is the largest local authority landlord in Scotland.  The Council
currently has around 13,000 applicants seeking housing and makes around 2,500-3,000 allocations in a typical
year.  The Council’s approved Housing Allocation Policy is based on a clear framework which seeks to prioritise
people who are in most need of housing and which meets the legal responsibilities the Council has in terms of
allocating housing.  The policy sets out the rules and guidelines regarding how the Service matches the people
who apply for Council housing with homes that become available.
Based on the results of our work, we have assessed the audit as providing ‘reasonable assurance’ as we
have concluded that there is a generally sound control environment in place although some issues and areas
for improvement have been identified.  We were pleased to note that the Council’s arrangements for the
management of housing allocations, including management of the waiting list, making housing offers and
assessing applications for tenancy succession are generally being conducted in line with approved Council
policies.  Recommendations for management consideration/action are detailed at Section 3 of the report and
include:
• There is an urgent need to review current users and user access privileges to the Common Housing
Register (CHR) system and to undertake such reviews on a regular basis thereafter;
• Although we found no evidence of inappropriate allocation decisions, there is a need to more clearly record
the rationale for both the waiting list and applicant selected when an offer is made to an applicant who is
not top of the selected waiting list to increase transparency and to enable the Service to better demonstrate
that decisions made were appropriate; and
• There is a need for the Service to review that key controls for checking applications input to the system
and validity of supporting documentation provided are operating appropriately. 
Internal Audit Opinion (see definition at Appendix 1) Reasonable assurance (Green-Amber) 
Organisational impact (see definition at Appendix 1) Moderate 
Report status FINAL Audit ref 0650/2023/001 Date issued 11/08/23
Audit Team Elaine MacDonald, Paula Hendry and Hugh Shevlin  
Page 76 of 240

Page 81

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0650.2023.001 - Housing Allocations/A - Findings and Reports/A07a 20230811 Housing
Allocations Final Report v1.0 .docx  2
1.  Executive Summary 
Objectives
The purpose of this audit was to provide assurance on adequacy and effectiveness of the Council’s key controls
and management arrangements associated with housing allocations and the extent to which the system
processes are operating in line with approved Council policies.  As well as the administration of the ‘waiting list’
and how applicants are offered housing, the review also covered how the Service manages tenancy succession
(where, upon the death of a tenant, the property is re-allocated to an individual currently residing at the property).
Work undertaken during this audit included:
• identification of key controls relating to housing allocations and compliance testing to confirm that the controls
are operating as expected;
• substantive testing on a random sample of housing waiting list applications, including a high-level review of
40 applications and detailed testing on 20 of these applications across two selected localities, to verify the
accuracy of information being entered into the Common Housing Register (CHR) system;
• a review of the authorisation process for a sample of 40 recent offers and a detailed review of the allocation
decision for 20 of these offers to confirm that allocation decisions were being made in accordance with the
approved policy; and
• review of 17 succession to tenancy applications to confirm that the decision to accept or reject the application
was adequately supported.
This engagement has been conducted in accordance with the ‘Public Sector Internal Audit Standards’.  The
Internal Audit section reports formally on conformance with these standards to the Audit and Scrutiny Panel. 
2.  Findings and Recommendations 
Number and category of recommendations raised
(see definition of priority at Appendix 1)   
High Medium Low
1 2 2 
Key areas requiring management action (High)
One key area requiring urgent management action has been identified:
• There is an urgent need to review current users and user access privileges to the Common Housing Register
(CHR) system and to undertake such reviews on a regular basis thereafter. 
Good practice identified
We noted the following areas of good practice during the audit:
• the Housing Allocation Procedure Manual and CHR System Guide, which is available to all staff, details the
eligibility criteria to be satisfied when making housing applications and assessing housing need, and the
processes to be followed when making offers of housing;
• applications for succession of tenancy must be made on a standard application form and must be supported
by appropriate documentary evidence to support eligibility;
• the CHR system, which is maintained and managed by NLC, is used by Council staff and many of its partner
registered social landlords to operate a joined-up housing provision service;
• points recorded/awarded in the CHR system are consistent with the approved Housing Allocation Policy; and
• effective control exists when housing is being offered with decisions to make offers to applicants requiring to
be reviewed and approved by an Area Housing Manager prior to any formal offer of housing being made. 
Other areas for improvement (Medium)
A number of other areas for improvement were also identified: (describe weaknesses identified)
• there is a need to more clearly record the rationale for both the waiting list and applicant selected when an
offer is made to an applicant who is not top of the selected waiting list to increase transparency and to enable
the Service to better demonstrate that decisions made were appropriate; and
• there is a need for the Service to review that key controls for checking applications input to the system and
validity of supporting documentation provided are operating appropriately. 
Page 77 of 240

Page 82

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0650.2023.001 - Housing Allocations/A - Findings and Reports/A07a 20230811 Housing Allocations Final Report v1.0 .docx 
3
3. Action Plan Housing Allocations 0650/2023/001 
Ref Finding
1 There is an urgent need to review current users and user access privileges to the Common Housing Register (CHR) system and to
undertake such reviews on a regular basis thereafter.
The CHR is the IT system used by North Lanarkshire Council and its partner registered social landlords (RSLs) to manage the housing waiting lists for social rented housing
in the area.  There are many system users across all landlords, each with different access permissions that are intended to be consistent with their designation and
responsibilities.  The Service’s Business Development and Support Team manages system access rights and oversees the operation of the CHR system.  Key aspects of the
allocation process are actioned on this system including the allocation of points to an applicant based on data input from an application form using standing data and the
approval of an offer for housing to an applicant.  As such, it is vital that access permissions to these critical aspects are appropriately restricted. 
We obtained a list of all live NLC CHR system users and information pertaining to role profiles, and noted the following issues:
• from a random sample of 20 live users, five of these users were no longer employed by the Council, with some leaving the Council’s employment as far back as 2018;
• 44 staff members had access to update/amend the CHR Pointing standing data within the system.  We understand that many of these users only require ‘view only’
access, suggesting that permissions within each CHR access role do not currently reflect the access needs of system users; and
• the Housing Allocations procedure manual assigns the authority to approve/reject housing offers to Area Housing Managers and as such, access within the system to
perform such actions should be appropriately restricted to only these individuals.  We noted that access to undertake this task was enabled for 14 role profiles, and that
210 users were assigned to these roles.  We understand that most of these users only require ‘view only' access to confirm/reject housing offers activity.
The issues identified above indicate a clear lack of regular, formal oversight and review of CHR system users and the access permissions for role profiles set up in the system.    
Implication Recommendation Priority Management response Implementation
Month/Year
Significant numbers of staff
with high levels of access
which they do not require
increases the risk of
inappropriate and/or fraudulent
misuse of the system and the
information held.
Inappropriate access levels
may not be identified and
amended promptly.
The Chief Officer (Housing Management) should ensure that:  
(1) as a matter of urgency, a full review of all users with CHR access
is undertaken to determine the ongoing validity of this access
taking action to amend/end as appropriate;
(2) a comprehensive review of access role profiles is undertaken to
ensure that the permissions granted within each role are
appropriate and only provide access necessary for the user to fulfil
their duties.  This should include specific review of staff with access
to amend standing data within the system and ensure it is
restricted to as few users as is operationally required;
(3) a formal user access review process is introduced whereby
confirmation is sought from relevant management, on a periodic
but regular basis (e.g. annually), that staff within their team who
have CHR system access continue to require this access and that
the access level allocated to each member of staff remains
relevant to their post’s responsibilities and duties; and
(4) regular reviews of access to restricted areas, such as the pointing
data, are undertaken to verify that there is no unusual activity
and/or where amendments have been made these are appropriate
and valid.
High Agree 
Lynn Lowe, IT Solutions Manager
(1) A full review of users and roles was
started as the Internal Audit
fieldwork was being undertaken,
and our review was completed in
March 2023.   The cases cited in
the finding above of leavers with
ongoing access will be cross-
checked to our review to confirm
access was removed as part of our
review (if not access will be
deleted).
(2–4) Going forward a formal user review
process will be undertaken on an
annual basis and will incorporate
all aspects of the
recommendations made in this
action point. 
Complete 
August 2023 
March 2024 
Page 78 of 240

Page 83

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0650.2023.001 - Housing Allocations/A - Findings and Reports/A07a 20230811 Housing Allocations Final Report v1.0 .docx 
4
3. Action Plan (continued) Housing Allocations 0650/2023/001 
Ref Finding
2 There is a need to more clearly record the rationale for both the waiting list and applicant selected when an offer is made to an
applicant who is not top of the selected waiting list to increase transparency and to enable the Service to better demonstrate that
decisions made were appropriate.
A formal process of consideration and review is carried out by Housing Advisers prior to making a housing offer proposal.  This involves determining which waiting list category
is most appropriate to allocate the property from, by reviewing each of the waiting lists’ performance against targets and details of the applicants’ placing on the selected waiting
list at the time of review. The Housing Advisor’s proposal is then reviewed by the Area Housing Manager, who will approve or reject it on the CHR system.
The waiting list generated follows the rules of the approved allocations policy when determining the position of applicants and normally the applicant at the top of the list with
the highest number of points should be made an offer.  However, there are exceptions to this rule, with the locality housing team considering factors such as making choices
that maintain diverse neighbourhoods and any urgent housing needs arising at the that time of the allocation.
The allocation process is undertaken on the CHR system with the waiting list category and generation of the selected list being displayed on screen.  No other hard copy or
electronic documentation to support the offer process is held.  The CHR system clearly logs the waiting list position of the successful applicant at the time the offer was made. 
If this applicant is not at the top of the wating list, a bypass reason must be entered on the system to indicate, for each applicant higher placed on the waiting list, why they
were not selected for the offer.  The system provides a drop-down list for selection of the bypass reason as well as a corresponding ‘details’ box that allows for free-text narrative
to be input to support the reason selected.
From our review of a sample of 20 recent housing offers, we are satisfied that offers are being assessed by Housing Advisors and approved by Area Managers in accordance
with guidance.  With regards the waiting list selected, whilst we noted that performance information captured and monitored by the Service includes % allocations per waiting
list category, it is our view that the lack of documentation to demonstrate the snapshot position at the time of generating the allocation proposal and brief narrative documenting
the reason this was the most appropriate list adversely impacts on the openness and transparency of the process.  Similarly, although in all cases reviewed, a bypass reason
had been selected, where necessary, we consider that where additional narrative was added to the system it was limited and failed to adequately and sufficiently document the
rationale for the allocation decision.  For example, for one sample case reviewed the applicant that the offer was made to was significantly lower on the waiting list and the
narrative simply stated “management decision” with no further explanation formally recorded as to the specific reason this individual was considered the most appropriate at
that point in time.  When queried by Internal Audit, the Area Housing Manager provided a clear, justifiable rationale for the decision which we were satisfied with, however, no
formal documented audit trail for this explanation existed.  Again, the lack of clearly documenting and substantiating decisions made diminishes the openness and transparency
of the process and could leave the Council open to criticism and/or an inability to properly defend its decision-making.
Implication Recommendation Priority
Offers of housing may be made
which are not in line with the
approved policy and without
sufficient evidence to support
the decisions made.  As such it
may be difficult to demonstrate
how decisions were made in
the event of any claims of bias
by other applicants.
The Chief Officer (Housing Management) should:
(1) to ensure transparency in the decision-making process, identify, and thereafter implement, appropriate arrangements
to improve the recording, justification and evidencing of the allocation process, from why a particular waiting list was
selected through to the rationale for bypassing applicants on the waiting list, particularly when the top ranked applicant
is not selected; and, 
(2) introduce a mechanism for periodic oversight and analysis of the bypass reasons used and undertake regular
analysis/monitoring to ensure that the policy, and exceptions to it, are being applied in an appropriate and consistent
manner across localities, and the rationale for allocations outwith the top of the list are adequately and sufficiently
documented. 
Medium 
Page 79 of 240

Page 84

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0650.2023.001 - Housing Allocations/A - Findings and Reports/A07a 20230811 Housing Allocations Final Report v1.0 .docx 
5
3. Action Plan (continued) Housing Allocations 0650/2023/001 
Management response Implementation
Month/Year
Agree
Tracey Harper, Performance and Improvement Manager
(1) A further IT enhancement to the ‘make an offer’ wizard within the CHR system will be required at the waiting list selection screen so that the waiting list
% lets at the time the offer was being made can be captured and the introduction of a free text box to enable an explanation of why a particular waiting
list was chosen to be added.  This would need to be kept with the offer information and visible for audit purposes.  These enhancements will require
system development work to be undertaken which will be impacted by available resources due to other competing demands and priorities.
With regards the rationale for bypassing applicants on the waiting list, the system already has functionality via a free text box for localities to clearly
record the rationale for their decision.  We will undertake a review of the pre-set bypass reasons selected from the drop-down list and will also re-enforce
to staff and management, via a briefing note, the importance of fully utilising this free text box for bypass reason to clearly demonstrate the rationale for
the chosen applicant when it is not the top ranked applicant.
(2) As an immediate action we will develop a quarterly audit report to address this recommendation. In addition, as Power BI reporting is rolled out across
the Council, we will utilise this to facilitate monthly reporting on bypass reasons used. 
July 2024 
September 2023 
September 2023 for
initial MCO report
December 2024 for
Power BI report 
Page 80 of 240

Page 85

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0650.2023.001 - Housing Allocations/A - Findings and Reports/A07a 20230811 Housing Allocations Final Report v1.0 .docx 
6
3. Action Plan (continued) Housing Allocations 0650/2023/001 
Ref Finding
3 There is a need for the Service to review that key controls for checking applications input to the system and validity of supporting
documentation provided are operating appropriately.
Applicants wishing to be considered for housing must complete a housing application form and provide various documents to evidence their eligibility and housing requirements
to their locality housing office.  Once received and initial checks on the completeness of the information and evidence provided have been undertaken, an officer at the locality
will input the application details to the CHR system.  The accuracy of input is then checked by another member of the team, after which the status of the application will move
to ‘live’, with points calculated and the applicant allocated a position on the relevant waiting list.  The second officer check in this instance acts as a key control in ensuring data
capture is accurate to facilitate the correct assessment of housing need. 
Although there is a clear expectation for segregation of duties in this regard, the system does not prohibit the same officer checking an application they have input.  Our review
of a random sample of 40 applications across various localities confirmed a high degree of compliance with this expectation, however, we did identify 3 instances (7.5%) from
our sample where the officer inputting the application detail also checked the input for accuracy.  Whilst we understand this was necessary due to staff shortages within a
specific locality, we noted that there is currently no mechanism in place to identify and/or monitor the incidence of this deviation from expected practice.  We consider that
management need to review and address this gap.
As part of our detailed review of a sample of 20 applications, we identified some instances where the data input was inaccurate or expected documentation was not retained
as follows: 
• while two forms of ID were being presented with applications, documentation accepted by locality offices was not always compliant with the acceptable forms of ID listed
with the application form; 
• no supporting documentation to evidence eligibility for one assessment for additional points was held; and 
• there were two instances where the additional points awarded to the applicant were incorrect based on our review of the application form. In both cases, an additional 10
points for overoccupancy in the applicant’s current accommodation had been allocated because of a specific question within the application (question 2c) being omitted or
incorrectly answered by the applicant and subsequently incorrectly recorded on the system   These anomalies have been highlighted to the localities, reviewed and
corrections made to the points awarded to each applicant. 
Implication Recommendation Priority
The Council may fail to award
housing based upon need if all
applications are not accurately
assessed and recorded.  
If information is not input and
checked for accuracy it may result in
an applicant not being correctly
assessed which could result in them
being omitted from consideration of
an offer of housing or unfairly
disadvantage other applicants.
The Chief Officer (Housing Management) should: 
(1) determine and introduce appropriate exception reports to identify and monitor instances of the same
officer inputting and checking an application to ensure this key control is not diminished and
appropriate action can be taken if the incidence of the same person inputting and checking increases;
(2) re-enforce to all locality staff involved in inputting and checking applications of the need to ensure
that forms of identification accepted with an application comply with the documentation criteria
specified in the procedures manual; and
(3) given the issue identified regarding the completion by applicants of question 2c and the award of
overoccupancy points depending on this, consider how this issue can be monitored to ensure
incorrect points do not continue to be awarded.  This might include consideration of appropriate
exception reports and awareness raising with locality staff. 
Medium 
Page 81 of 240

Page 86

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0650.2023.001 - Housing Allocations/A - Findings and Reports/A07a 20230811 Housing Allocations Final Report v1.0 .docx 
7
3. Action Plan (continued) Housing Allocations 0650/2023/001 
Management response Implementation
(Month/Year)
Agree 
Tracey Harper, Performance and Improvement Manager
(1) The system can be amended to include validation which will prevent the same officer inputting and checking an application – a similar process
is in place for offers.  This will require system development work to be undertaken which will be impacted by available resources due to other
competing demands and priorities.  Although we will aim to introduce this amendment as soon as is reasonably possible, it is likely to take
some time therefore as an interim measure we will develop a report to monitor compliance with requirement for the input and checking of
applications to be undertaken by different officers.   
(2) We believe the current procedure document is already explicit in this regard; however, given the audit findings above, a briefing note will be
developed to issue further instructions to staff and management teams to re-iterate expectations.
(3) We believe the current procedure document is already explicit in this regard.  However, the above briefing note at point 2 will also include
specific instruction regarding couples within the household and the check an application process. 
Interim measure – October 2023
System amendments – July 2024 
September 2023 
September 2023 
Page 82 of 240

Page 87

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0650.2023.001 - Housing Allocations/A - Findings and Reports/A07a 20230811 Housing Allocations Final Report v1.0 .docx 
8
3. Action Plan (continued) Housing Allocations 0650/2023/001 
Ref Finding
4 Waiting list and suspension reviews are not always completed in a timely manner.
To ensure that the housing waiting list remains up-to-date and reflective of need, the Service’s operating arrangements require an annual review of every applicant and their
circumstances on the waiting list to be undertaken.  The CHR system has a review enquiry process to assist in this by highlighting all applicants on the system with whom there
has been no contact over the last 365 days.  The system then initiates sending a letter to the applicant requesting an update of their details, or confirmation that their
circumstances remain unchanged.  No contact from the applicant results in the application being cancelled and removal from the waiting list.
We were pleased to note that waiting list reviews at most localities were up to date, however, at the time of our fieldwork (May 2023), the waiting list reviews at Shotts and
Wishaw localities had not been undertaken in a timely manner, with some reviews being significantly overdue and outstanding since before October 2022.  We understand that
there were staffing issues at these locality offices and that management have now identified actions to enable the recommencement of these reviews.
The Service may also suspend an applicant from the waiting list temporarily on the grounds of conduct (e.g. previous rent arrears, refusal of previous offers or anti-social
behaviour) and/or eligibility (e.g. an unmet support need). The Service’s allocations procedures manual outlines that all suspensions, other than those allocated for a set period,
require to be reviewed on a fortnightly basis.  The CHR system has a suspension enquiry process that, when utilised, acts as evidence that suspensions are being reviewed
on a regular basis and that they remain valid.
Our sample testing confirmed that suspension reviews linked to rent arrears are being undertaken in accordance with expected practice, however, reviews of suspensions for
other reasons were only being undertaken on an ad-hoc basis.  Although our testing confirmed the reason for suspending applicants appeared valid, we consider that there is
scope to improve the consistency with which suspension reviews are carried out.
Implication Recommendation Priority Management response Implementation
Month/Year
If reviews of waiting lists are not
undertaken regularly and timely, the
information held in the CHR system
may not be accurate and up to date,
and properly reflect the housing needs
in the area.
If reviews of applications which have
been suspended are not undertaken
on a regular basis, applications may
remain suspended for longer than
necessary which could lead to the
applicant not being considered for
offers of housing. 
The Chief Officer (Housing Management) should remind
all localities of the need to:
(1) continue monitor progress of waiting list reviews to
ensure they are being undertaken on a timely basis
for applicants who have had no other contact within
the last year to enable the early identification of
potential delays and subsequent remedial action to
address this; and
(2) ensure that formal reviews of all open-ended
suspended applications are undertaken on a
fortnightly basis in line with corporate expectations. 
Consideration should also be given as to whether
the current review frequency remains appropriate or
requires to be altered.
Low Agree 
Tracey Harper, Performance and
Improvement Manager
(1) Progress of waiting list reviews is
already undertaken on a monthly basis
as part of Measuring Charter Outcomes
reporting and reviewed by senior
management including the Chief
Officer (Housing Management),
however we will remind all housing
localities of need to progress.
(2) Localities will be reminded of review
frequency for open-ended suspended
applications. 
August 2023 
Page 83 of 240

Page 88

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0650.2023.001 - Housing Allocations/A - Findings and Reports/A07a 20230811 Housing Allocations Final Report v1.0 .docx 
9
3. Action Plan (continued) Housing Allocations 0650/2023/001 
Ref Finding
5 Required evidence to support succession of tenancy decisions were not always held.
A succession of tenancy is a situation where on the death of a tenant, the property is re-allocated to other individuals currently residing at the property.  Legal succession is
possible provided there is a "qualified person" (whose only or principal home at the time of the tenant’s death was within the tenant’s house).  The relationship of the qualified
person to the deceased person needs to be ascertained and a ‘rank’ attributed to them based on the criteria and requirements set out in the Housing (Scotland) Act 2001, as
amended.  In assessing an application for succession of tenancy and determining the eligibility for the right to succeed the tenancy, the applicant is required to provide evidence
to support the relationship declared (which differs for each rank) and proof of their permanent residency at the property.
From the sample of 14 successful and 3 unsuccessful successions reviewed during this audit, we were satisfied that generally applications for succession to tenancy are
accurately assessed, and the correct succession decision had been reached.  However, we noted the following omissions:  
• instances of an absence of adequate documentary evidence in support of decisions reached.  This included one original succession application that could not be produced,
one application that had not been copied, and therefore was not held on file in full and one application where proof of death and other evidence of eligibility had not been
retained (the locality explained they do not retain evidence on data protection grounds); and
• one application form where the ‘housing advisor recommendation’ section of the application for succession to tenancy did not record the succession rank attributed and
two other forms that had an incorrect succession rank recorded.  Although no incorrect succession decision had been reached as a result, there is an increased risk that
this may occur if insufficient or incorrect information is recorded/evidence is received.
Implication Recommendation Priority Management response Implementation
Month/Year
The Council may be unable to provide
evidence that its decisions to award or
reject successions is in accordance with
legislation and procedures. 
If the correct rank of the applicant is not
identified, evidence requested to support
the application may not be sufficient which
may result in an incorrect decision being
made.
The Chief Officer (Housing Management) should remind all
localities of the need to ensure that all applications and
relevant supporting documentation for succession of tenancy
are retained on file and the qualifying rank of the applicant is
accurately assessed and documented on the ‘housing advisor
recommendation’ section of the application for succession of
tenancy form.
Low Agree
Tracey Harper, Performance and
Improvement Manager
A review of the Succession application
and other paperwork will be
undertaken, and instruction issued to
locality teams as required. 
September 2023 
Page 84 of 240

Page 89

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0650.2023.001 - Housing Allocations/A - Findings and Reports/A07a 20230811 Housing
Allocations Final Report v1.0 .docx  10
Appendix 1 - Audit Grading
Audit reports are graded with an overall assurance opinion, and any issues and associated
recommendations are classified individually to denote their relative importance, in accordance with
the definitions in the tables below. 
Definition of audit assurance and recommendation categories
Assurance Confidence based on sufficient evidence that internal controls are in place, operating
effectively and objectives are being achieved. 
Assurance opinion
Green Substantial
Assurance
A sound system of governance, risk management and control exists, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Green-Amber Reasonable
Assurance
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for improvement were
identified which may put at risk the achievement of objectives in the area
audited.
Amber-Red Limited
Assurance
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management and
control to effectively manage risks to the achievement of objectives in the
area audited.
Red No
Assurance
Immediate action is required to address fundamental gaps, weaknesses or
non-compliance identified. The system of governance, risk management and
control is inadequate to effectively manage risks to the achievement of
objectives in the area audited. 
Organisational impact
Major The weaknesses identified during the review have left the Council open to significant risk.  If
the risk materialises it would have a major impact upon the organisation.
Moderate The weaknesses identified during the review have left the Council open to medium risk.  If the
risk materialises it would have a moderate impact upon the organisation.
Minor The weaknesses identified during the review have left the Council open to low risk.  If the risk
materialises it would have a minor impact upon the organisation. 
Recommendation priority
High
Significant control failure or weakness that, if not addressed, may lead to a major financial,
operational or reputational risk to the organisation and/or significantly impact the successful
delivery and achievement of the objectives of the area under review.  Urgent/Immediate action
is required.
Medium
Control failure or weakness that, if not addressed, may lead to a moderate financial,
operational or reputational risk to the organisation.  Weakness may be individually significant
but is unlikely to affect the successful delivery and achievement of the overall objectives of the
area under review.  The risk of error would, however, be significantly reduced if corrective
action was taken.  Prompt action is required.  
Low
Control failure or weakness that may lead to a minor financial, operational or reputational risk
to the organisation.  Weakness does not appear to significantly affect the ability to meet
objectives.  Minor issue raised to improve the efficiency and effectiveness of controls. 
Page 85 of 240

Page 90

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0900.2023.011 - Review of Council's
Anti-Fraud Policy/A - FINDINGS AND REPORT/A06a 20230811 Counter Fraud Arrangements Final Report v1.0.docx 1 
INTERNAL AUDIT REPORT 
REVIEW OF THE COUNCIL’S COUNTER FRAUD ARRANGEMENTS 
Contents  
1. Executive Summary 2. Findings and Recommendations 3. Action Plan
Appendix 1:   Audit grading  
Appendix 2:  Good Practice identified – CIPFA Code of Practice on Managing Risk of Fraud and Corruption
Appendix 3: Good Practice Identified – Fighting Fraud and Corruption Locally – A Strategy for the 2020s
Issued to: Chief Officer (Audit and Risk) (points 1, 2 & 3(1)) and Chief Officer (People Resources) (point 3(2) only)  
Copied to: Chief Executive 
Headlines
The purpose of this audit was to provide assurance on the adequacy and effectiveness of the Council’s Anti-Fraud
Policy and management arrangements for the prevention and detection of fraud to identify any actions necessary
to update the policy and ensure that the Council’s arrangements are consistent with recognised good practice. Work
undertaken included consideration of the Council’s anti-fraud arrangements against a good practice checklist
developed from a range of sources, including the CIPFA Code of Practice on Managing Risk of Fraud and
Corruption and Fighting Fraud and Corruption Locally – A Strategy for the 2020s as well as an update and refresh
of the Anti-Fraud Policy, including a change of title to Counter Fraud Policy.  The updated Counter Fraud Policy will
be submitted to the Policy and Strategy Committee for approval in September.  Areas of recognised good practice
are detailed at appendices 2 and 3.
Based on the results of the work undertaken, we have categorised this audit as offering ‘reasonable assurance’. 
We consider that the Council’s arrangements are generally aligned with good practice as responsibility for ensuring
that risks of fraud and corruption are managed effectively has been acknowledged and is embedded in the Council’s
governance arrangements, a risk management framework is in place, which includes a corporate risk for ‘serious
organised crime, fraud or corruption’ and there is an approved Anti-Fraud Policy in place which details the Council’s
attitude to fraud and its approach to the prevention, detection and investigation of fraud across all of the Council’s
service areas.
We have, however, identified a small number of areas for improvement to better align the Council’s counter fraud
arrangements with good practice and our recommendations are detailed at Section three of this report.  These
include:
• There is no dedicated counter fraud resource, counter fraud plan or annual counter fraud report and fraud work
undertaken is generally reactive rather than proactive;
• There is scope for improvement in the consideration and inclusion of fraud risks in Service Risk Registers and
reporting on recognised fraud risk; and
• There is a lack of awareness raising in relation to fraud risks and how these can be prevented, detected and
reported. 
Internal Audit Opinion (see definition at Appendix 1) Reasonable assurance (Green-Amber) 
Organisational impact  (see definition at Appendix 1) Moderate 
Report status FINAL Audit ref 0900/2023/011 Date issued 11/08/23
Audit Team Lesley Armstrong and Paula Hendry 
Page 86 of 240

Page 91

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0900.2023.011 - Review of Council's
Anti-Fraud Policy/A - FINDINGS AND REPORT/A06a 20230811 Counter Fraud Arrangements Final Report v1.0.docx 2
1.  Executive Summary 
Objectives
The purpose of this audit was to provide assurance on the adequacy and effectiveness of the Council’s Anti-Fraud
Policy and management arrangements for the prevention and detection of fraud to identify any actions necessary to
update the policy and ensure that the Council’s arrangements are consistent with recognised good practice. 
Work undertaken included:
• a review of the current anti-fraud arrangements against a good practice checklist, prepared by Internal Audit,
from a range of sources including the CIPFA Code of Practice on Managing Risk of Fraud and Corruption and
Fighting Fraud and Corruption Locally – A Strategy for the 2020s; and
• a comprehensive review of the Council’s Anti-Fraud Policy, including comparison against good practice and a
range of other Scottish Council’s policies to identify any areas for improvement.  This included renaming the
Policy to the Counter Fraud Policy to better align it to good practice.
This engagement has been conducted in accordance with the ‘Public Sector Internal Audit Standards’.  The Internal
Audit section reports formally on conformance with these standards to the Audit and Scrutiny Panel. 
2.  Findings and Recommendations 
Number and category of recommendations raised
(see definition of priority at Appendix 1)
High Medium Low
0 3 0 
Key areas requiring management action (High)
No key areas requiring urgent management action have been identified. 
Good practice identified
We noted the following areas of good practice during the audit:
• The Council has in place an Anti-Fraud Policy which has been approved by Committee.  The policy states that
the Council has a zero-tolerance attitude to fraud and will not accept any level of fraud, bribery or corruption and
outlines the responsibilities of the Chief Executive, senior management and staff for preventing and detecting
fraud;
• A number of policies/procedures are in place which are designed to assist in the prevention/detection of fraud
including codes of conduct for both employees and chief officers, a Whistleblowing policy, a Money Laundering
Policy and an Information Security Policy;
• The Council has identified serious organised crime, fraud and corruption as a corporate risk, which is included in
the Council’s Corporate Risk Register and monitored by CMT on a regular basis; and 
• The Council participates in the National Fraud Initiative (NFI) data matching exercises and is an active member
of the Scottish Local Authorities Investigators Group (SLAIG) which enables sharing of information in relation to
current and emerging fraud risks. 
Other areas for improvement (Medium)
A number of other areas for improvement were identified:
• There is no dedicated counter fraud resource, counter fraud plan or annual counter fraud report and fraud work
undertaken is generally reactive rather than proactive;
• There is scope for improvement in the consideration and inclusion of fraud risks in Service Risk Registers and
reporting on recognised fraud risk; and
• There is a lack of awareness raising in relation to fraud risks and how these can be prevented, detected and
reported. 
Page 87 of 240

Page 92

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0900.2023.011 - Review of Council's Anti-Fraud Policy/A - FINDINGS AND REPORT/A06a 20230811 Counter Fraud
Arrangements Final Report v1.0.docx 3
3. Action Plan Review of the Council’s Counter Fraud Arrangements 0900/2023/011 
Ref Finding
1 There is no dedicated counter fraud resource, counter fraud plan or annual counter fraud report and fraud work undertaken is
generally reactive rather than proactive.
Good practice advises that local authorities should have effective counter fraud arrangements in place, acknowledging and understanding fraud risks and demonstrating this
by committing the right support and appropriate resource to tackling fraud.  It states that not every local authority requires a large team but should have assessed the risk, have
a plan to address it and have access to resources with the right capabilities and skills.  This includes having a counter fraud plan, counter fraud annual report and dedicated
counter fraud resource with staff appropriately trained in fraud processes.
Our review of the Council’s counter fraud arrangements against good practice confirmed that the arrangements in place are generally satisfactory.  Responsibility for ensuring
that the risks of fraud and corruption are managed effectively has been acknowledged and is embedded in the Council’s governance arrangements, particularly through the
requirement for Chief Officers to complete an annual assurance certificate and the presentation of an Annual Governance Statement to Committee.   A risk management
framework is in place, with both corporate and service risk registers and there is a corporate risk for ‘serious organised crime, fraud or corruption’ which is regularly monitored
by CMT and updated as appropriate.  The Council also has in place an approved Anti-Fraud Policy which details its approach to the prevention, detection and investigation of
fraud across all of the Council’s service areas and defines the responsibilities of managers, employees and key stakeholders in relation to fraud. 
However, we identified some areas where the Council’s counter fraud arrangements were not compliant with good practice, as follows:
• The Council does not have a dedicated counter fraud resource to undertake fraud work on targeted areas, therefore work carried out in relation to fraud is generally reactive
rather than proactive.  All fraud investigations are undertaken by Internal Audit staff and whilst all Internal Auditors hold a professional qualification, have many years’
experience and have received some fraud training, they do not hold formal fraud investigation qualifications or counter fraud accreditation.   A number of other local authorities
have established counter fraud teams who deliver outcomes and savings based on the counter fraud work undertaken.  In determining whether it would be beneficial for the
Council to have a counter fraud resource, consideration should be given to undertaking a review/cost benefit analysis to benchmark against other local authorities;
• The Internal Audit Annual Plan details the work to be undertaken by Internal Audit during the year and, whilst this contains a section on frauds and irregularity, it only includes
work on the National Fraud Initiative (NFI) and an allowance for responding to instances of reported fraud and irregularities, therefore, fraud work currently undertaken is
generally reactive rather than proactive.  As such, there is no annual counter fraud plan outlining how the Council plans to proactively prevent and detect potential fraud or
irregularity or how the success of the Anti-Fraud Policy will be measured.  There is no overall assessment of the level of fraud risk to the Council (e.g. through the use of
data analytics, estimates of the cost of fraud or analysis of statistics in relation to the outcome of frauds identified and investigated) or to identify service areas where proactive
work could potentially lead to financial savings for the Council.  The outcome of such analysis could be included in a counter fraud plan; and
• The Audit and Scrutiny Panel (ASP) receives Internal Audit progress reports at each committee cycle, an annual report at its June meeting and update reports on the NFI,
which include details of significant fraud investigations undertaken in the period. However, there is no annual counter fraud report or sufficiently detailed commentary in
existing reports to report on the success and outcomes of the Anti-Fraud Policy, including the levels of fraud reported, fraud work undertaken, analysis of statistics in relation
to fraud activity and outcomes, publication of successful outcomes and future plans for undertaking fraud work.
(continued overpage) 
Page 88 of 240

Page 93

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0900.2023.011 - Review of Council's Anti-Fraud Policy/A - FINDINGS AND REPORT/A06a 20230811 Counter Fraud
Arrangements Final Report v1.0.docx 4
3. Action Plan Review of the Council’s Counter Fraud Arrangements 0900/2023/011 
Implication Recommendation Priority Management response Implementation
Month/Year
The Council may not be able to fully
demonstrate compliance with good
practice on counter fraud
arrangements.
The absence of proactive fraud
investigation work could significantly
impact the Council’s ability to promptly
identify, prevent and/or respond to
fraud and irregularity and could lead to
significant financial loss for the
Council. 
The Chief Officer (Audit and Risk) should:
(1) review and consider the benefits of identifying
and undertaking more proactive work in
relation to fraud and irregularity by assessing
the level of fraud risk and identifying service
areas where proactive fraud work could
potentially lead to financial savings for the
Council;
(2) consider whether there is a need for a
dedicated, appropriately qualified and
experienced staff resource to undertake such
work.  This may include discussions with
other Councils who already have such a
resource to identify potential areas of work
and the cost and benefits involved; and
(3) prepare an annual counter fraud plan which
outlines the fraud work to be undertaken
throughout the year and an annual counter
fraud report which details the success and
outcomes of the Counter Fraud Policy,
including the levels of fraud reported, fraud
work undertaken, analysis of statistics in
relation to fraud activity and outcomes,
publication of successful outcomes and future
plans for undertaking fraud work.
Medium Agree
Ken Adamson, Chief Officer (Audit and Risk)
(1) Whilst fraud risks facing the Council are generally
understood and recognised within the Council’s
risk management framework, it is accepted that,
to date, the approach adopted has been largely
focused on prevention of fraud and robust
investigation where it is identified.  Resource
allocation has therefore been predominantly
reactive.
Work will be undertaken to assess how other
public bodies approach counter-fraud activity with
a view to bringing forward proposals to CMT on
how the Council might address this issue.  This
will include consideration of how to better assess
fraud risks facing the Council and whether a
business case exists for bespoke counter-fraud
staffing resources to be established.
(2) See response to (1) above.
(3) Consideration will be given to how best to address
this issue as part of the proposals referenced at
(1). 
Proposals:
December 2023
Implementation:
April 2024 
As above
As above 
Page 89 of 240

Page 94

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0900.2023.011 - Review of Council's Anti-Fraud Policy/A - FINDINGS AND REPORT/A06a 20230811 Counter Fraud
Arrangements Final Report v1.0.docx 5
3. Action Plan (continued) Review of the Council’s Counter Fraud Arrangements 0900/2023/011 
Ref Finding
2 There is scope for improvement in the consideration and inclusion of fraud risks in Service Risk Registers and reporting on
recognised fraud risks.
Good practice states that fraud risk identification is essential to understand specific exposures to risks, changing patterns in fraud and corruption threats, and the potential
consequences to the Council and its service users.  It advises that fraud risk should be considered as part of the Council’s risk management arrangements.
The Council’s Risk Management Strategy provides a framework for ensuring that risk management processes are in place to enable risk to be managed and provides guidance
on how to identify, analyse and assess risks.   Serious organised crime, fraud and corruption has been identified as a corporate risk and as one of the risk sub-categories for
consideration by Services when identifying risks and preparing Service Risk Registers.
There has been a vast amount of activity over recent years to review and improve the identification, recording and reporting of risks and associated controls and required
actions.  The Council has a risk management system (Figtree) for recording and managing all corporate and service risks.  Our review of the Figtree system identified only 21
live Service risks relating to fraud with 12 classified as ‘serious organised crime, fraud and corruption’, many of which were very high level and insufficiently descriptive.  Given
the number of individual Service areas within the Council and the identified sources of fraud risks detailed in Appendix A of the revised Counter Fraud Policy, we consider that
there is scope for improvement in the identification and recording of fraud risks by Services to ensure that proper consideration is given to all activities undertaken by Services
to identify potential fraud risks, controls and actions required to mitigate these, and that these are appropriately detailed in Service Risk Registers.  This should facilitate
appropriate reporting on fraud risks to enable senior management to regularly review and monitor risk registers and inform decision making, in line with the terms of reference
for Service Management Teams (SMT).
Implication Recommendation Priority Management response Implementation
Month/Year
Senior management and elected members
may not be fully aware of the fraud risks that
the Council are exposed to.
If Services do not fully consider all potential
areas of fraud risks, appropriate controls may
not be implemented and there may be an
increased risk of fraud and corruption
occurring within their Service area, which
could lead to financial loss for the Council.
The Chief Officer (Audit and Risk) should ensure that
sufficient direction/guidance is provided to Services,
via the Corporate Risk Management Working Group,
to enable Services to give proper consideration to
fraud risks when preparing their Service Risk
Registers, with particular emphasis on the identified
sources of fraud risks detailed in Appendix A of the
revised Counter Fraud Policy, with reporting to SMT
thereafter.
Medium Agree
Ken Adamson, Chief Officer (Audit and
Risk)
While line management within Services are
responsible for the content of Service risk
registers, the RMCWG will be used to remind
Services of the need to ensure that relevant
fraud risks facing individual Services are
properly recognised in risk registers.  As part
of this process, Internal Audit will also work
with Services to highlight relevant risks,
informed by the experience of other public
bodies and relevant national risk
assessments. 
October 2023 
Page 90 of 240

Page 95

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0900.2023.011 - Review of Council's Anti-Fraud Policy/A - FINDINGS AND REPORT/A06a 20230811 Counter Fraud
Arrangements Final Report v1.0.docx 6
3. Action Plan (continued) Review of the Council’s Counter Fraud Arrangements 0900/2023/011 
Ref Finding
3 There is a lack of awareness raising in relation to fraud risks and how these can be prevented, detected and reported.
The Council has a zero tolerance approach to fraud, bribery and corruption and outlines its approach to the prevention, detection and investigation of this.  Additionally, the
Council has a Whistleblowing Policy which provides a mechanism for reporting fraud and concerns of serious wrongdoing within the Council.  However, neither of these policies
appear to be actively promoted to ensure that staff and Elected Members are aware of the risks of fraud, how they can assist in the prevention and detection of fraud and how
to report any issues/suspicions. We noted the following:
• The current Anti-Fraud Policy is not actively promoted.  Whilst the policy was approved by the then Policy and Resources Committee and is therefore available on MARS, it
is not available on InsideNL, MyNL or the Council’s website and regular awareness raising activities, such as NLC announcements or articles in staff newsletters, are not
undertaken to ensure that all staff and Elected Members are aware of the Council’s approach to fraud and their responsibilities in relation to the prevention, detection and
reporting of fraud; 
• Other than emailing Internal Audit, there is no appropriate mechanism for reporting frauds/suspected frauds both either internally and externally to ensure that all the required
information to assist with any investigation is reported, and there is no signposting on InsideNL or the Council’s website for reporting fraud;
• The online induction course for new employees states that employees must follow the Employee Code of Conduct, however, there is no specific reference to the Council’s
zero tolerance approach to fraud, bribery and corruption or the Anti-Fraud Policy;
• There is a Fraud Awareness e-learning module on LearnNL, however as access levels are not monitored, it is difficult to determine the uptake of this module.  The module
was created about three years ago and the content is not specific to North Lanarkshire Council and does not refer to the policies, processes and procedures in place for
being alert to fraud and raising suspicion of fraud, including the Anti-Fraud Policy.  There is scope for reviewing and updating the module to make it more relevant to the
Council; and
• The Employee Code of Conduct makes reference to both the Anti-Fraud and Whistleblowing policies and contains links to them, however, these links are not active.
Implication Recommendation Priority
Staff and Elected Members may not be
aware of the Councils approach to fraud and
their responsibilities in relation to the
prevention, detection and reporting of fraud.
(1) The Chief Officer (Audit and Risk) should identify and implement appropriate and effective methods for
communicating and raising awareness of fraud risks and responsibilities for preventing, detecting and
reporting fraud.  This should include:
• promoting the Counter Fraud Policy by making it available on relevant platforms (such as InsideNL,
MYNL and the Council’s website) and through regular awareness raising activities (such as NLC
announcements or inclusion in staff newsletters); and
• creating a form for reporting fraud, both internally and externally, to incorporate all the required
information and enable prompt notification to Internal Audit.
(2) The Chief Officer (People Resources) should:
• review and update the online induction and fraud awareness modules to include relevant content in
relation to the identification of fraud risks, the Council’s response to fraud through its policies and
processes and raising awareness of the Council’s Counter Fraud Policy; and
• ensure that the links to other policies contained with the Employee Code of Conduct are active. 
Medium 
Page 91 of 240

Page 96

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0900.2023.011 - Review of Council's Anti-Fraud Policy/A - FINDINGS AND REPORT/A06a 20230811 Counter Fraud
Arrangements Final Report v1.0.docx 7 
3. Action Plan (continued) Review of the Council’s Counter Fraud Arrangements 0900/2023/011 
Management response Implementation
Month/Year
Agree
(1) Ken Adamson, Chief Officer (Audit and Risk)
The revised Counter Fraud Policy will be communicated to all staff once approved by Committee.
Additional communications will also be undertaken with CMT and OMT highlighting the need for line management within Services to understand the
fraud risks they face and how to respond both in terms of prevention, detection and response when fraud is identified.  This work will be linked to actions
outlined at action plan point 2 above.
Arrangements for reporting fraud will be enhanced with the development of an on-line reporting tool for staff and the public. 
(2) Fiona Whittaker, Chief Officer (People Resources) 
Relevant People Resources teams will review the Council’s current training provision and documentation aligned to our Anti-Fraud arrangements,
including the code of conduct to ensure that they are robust.  An employee communication plan regarding this material will also be developed. 
September 2023
October 2023 
October 2023 
December 2023
Page 92 of 240

Page 97

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0900.2023.011 - Review of Council's
Anti-Fraud Policy/A - FINDINGS AND REPORT/A06a 20230811 Counter Fraud Arrangements Final Report v1.0.docx 8
Appendix 1 - Audit Grading
Audit reports are graded with an overall assurance opinion, and any issues and associated
recommendations are classified individually to denote their relative importance, in accordance with
the definitions in the tables below. 
Definition of audit assurance and recommendation categories
Assurance Confidence based on sufficient evidence that internal controls are in place, operating
effectively and objectives are being achieved. 
Assurance opinion
Green Substantial
Assurance
A sound system of governance, risk management and control exists, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited. 
Green - Amber Reasonable
Assurance
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for improvement were
identified which may put at risk the achievement of objectives in the area
audited.
Amber - Red Limited
Assurance
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management and
control to effectively manage risks to the achievement of objectives in the
area audited.
Red No
Assurance
Immediate action is required to address fundamental gaps, weaknesses or
non-compliance identified. The system of governance, risk management and
control is inadequate to effectively manage risks to the achievement of
objectives in the area audited. 
Organisational impact
Major The weaknesses identified during the review have left the Council open to significant risk.  If
the risk materialises it would have a major impact upon the organisation as a whole.
Moderate The weaknesses identified during the review have left the Council open to medium risk.  If the
risk materialises it would have a moderate impact upon the organisation as a whole.
Minor The weaknesses identified during the review have left the Council open to low risk.  If the risk
materialises it would have a minor impact upon the organisation as a whole. 
Recommendation priority
High Significant control failure or weakness that, if not addressed, may lead to a major financial,
operational or reputational risk to the organisation and/or significantly impact the successful
delivery and achievement of the objectives of the area under review.  Urgent/Immediate action
is required.
Medium Control failure or weakness that, if not addressed, may lead to a moderate financial,
operational or reputational risk to the organisation.  Weakness may be individually significant
but is unlikely to affect the successful delivery and achievement of the overall objectives of the
area under review.  The risk of error would, however, be significantly reduced if corrective
action was taken.  Prompt action is required.  
Low
Control failure or weakness that may lead to a minor financial, operational or reputational risk
to the organisation.  Weakness does not appear to significantly affect the ability to meet
objectives.  Minor issue raised to improve the efficiency and effectiveness of controls. 
Page 93 of 240

Page 98

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0900.2023.011 - Review of Council's Anti-Fraud Policy/A - FINDINGS AND REPORT/A06a 20230811 Counter Fraud
Arrangements Final Report v1.0.docx 9
Appendix 2 – Good Practice Identified in CIPFA Code of Practice on Managing the Risk of Fraud and Corruption 
Principle A – Acknowledge the responsibility of the governing body for countering fraud and corruption
A1 – acknowledge threats of fraud and corruption and the harm they can cause to the organisation, its aims, objectives and to its service users.
A2 – acknowledge the importance of a culture that is resilient to the threats of fraud and corruption and aligns to the principles of good governance.
A3 – acknowledges its responsibility for ensuring the management of its fraud and corruption risks and will be accountable for the actions it takes through its governance
reports.
A4 – sets a specific goal of ensuring and maintaining its resilience to fraud and corruption and explores opportunities for financial savings from enhanced fraud detection
and prevention.
Principle B – Identify risks – fraud risk identification is essential to understand specific exposure to risks, changing patterns in fraud and corruption threats
and the potential consequences to the organisation and its service users.
B1 – Fraud risks are routinely considered as part of the organisation’s risk management arrangements.
B2 – The organisation identifies the risks of corruption and the importance of behaving with integrity in its governance framework.
B3 – The organisation uses published estimates of fraud loss, and where appropriate its own measurement exercises, to aid its evaluation of fraud risk exposures.
B4 – The organisation evaluates the harm to its aims and objectives and service users that different fraud risks can cause.
Principle C – Develop a strategy – an organisation needs a counter fraud strategy setting out its approach to managing its risks and defining responsibilities
for action.
C1 – The governing body formally adopts a counter fraud and corruption strategy to address the identified risks and align with the organisations acknowledged
responsibilities and goals.
C2 – The strategy includes the organisation’s use of joint working or partnership approaches to managing its risks, where appropriate.
C3 – The strategy includes both proactive and responsive approaches that are best suited to the organisation’s fraud and corruption risks.  
C4 – The strategy includes clear identification of responsibility and accountability for delivery of the strategy and for providing oversight. 
Page 94 of 240

Page 99

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0900.2023.011 - Review of Council's Anti-Fraud Policy/A - FINDINGS AND REPORT/A06a 20230811 Counter Fraud
Arrangements Final Report v1.0.docx 10
Appendix 2 (cont’d) – Good Practice Identified in CIPFA Code of Practice on Managing the Risk of Fraud and Corruption 
Principle D – Provide resources – the organisation should make arrangements for appropriate resources to support the counter fraud strategy.
D1 – An annual assessment of whether the level of resource invested to counter fraud and corruption is proportionate to the level of risk.
D2 – The organisation utilises an appropriate mix of experienced and skilled staff, including access to counter fraud staff with professional accreditation.
D3 – The organisation grants counter fraud staff unhindered access to its employees, information and other resources as required for investigation purposes.
D4 – The organisation has protocols in place to facilitate joint working and data and intelligence sharing to support counter fraud activity.
Principle E – Take action – the organisation should put in place policies and procedures to support the counter fraud and corruption strategy and take
action to prevent, detect and investigate fraud.
E1 – The organisation has put in place a policy framework which supports the implementation of the counter fraud strategy. 
E2 – Plans and operations are aligned to the strategy and contribute to the achievement of the organisation’s overall goal of maintaining resilience to fraud and corruption.
E3 – Making effective use of national or sectoral initiatives to detect fraud or prevent fraud, such as data matching or intelligence sharing.
E4 – Providing for independent assurance over fraud risk management, strategy and activities.
E5 – There is a report to the governing body at least annually on performance against the counter fraud strategy and the effectiveness of the strategy from the lead
person(s) designated in the strategy.  Conclusions are featured in the annual governance report. 
Page 95 of 240

Page 100

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0900.2023.011 - Review of Council's Anti-Fraud Policy/A - FINDINGS AND REPORT/A06a 20230811 Counter Fraud
Arrangements Final Report v1.0.docx 11
Appendix 3 – Good Practice Identified in Fighting Fraud and Corruption Locally (FFCL) – A Strategy for the 2020s 
Part 1 – What Should Stakeholders Do?
The Chief Executive Is the authority measuring itself against the FFCL checklist?
Is there a trained counter fraud resource in the organisation or does the organisation have access to one?
Is the audit committee receiving regular reports on the work of those leading on fraud and is the external auditor aware of this?
The Section 95
Officer
Is there a portfolio holder who has fraud in their remit?
Is the head of internal audit or counter fraud assessing resources and capability? (A3)
Does internal audit have sufficient internal unfettered access? (D3)
Does internal audit produce a report on activity, success and future plans and are they measured on this?
The Monitoring
Officer
Are members, audit committees and portfolio leads aware of counter fraud activity and is training available for them?
Is the fraud team independent of process and does it produce reports to relevant committees that are scrutinised by members?
The Audit Committee Does the audit committee receive a report at least once a year on the counter fraud activity which includes proactive and reactive work?
Does the audit committee receive a report from fraud leads on how the resource is being allocated, whether it covers all areas of fraud risk and
where those fraud risks are measured?
Is the audit committee aware that the relevant portfolio holder is up to date and understands the activity being undertaken to counter fraud?
Does the audit committee support proactive counter fraud activity?
The Portfolio Lead Does the portfolio lead receive a regular report that includes information, process and barriers on the assessment against the FFCL checklist
Fraud risk assessment and horizon scanning? 
Page 96 of 240

Page 101

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0900.2023.011 - Review of Council's Anti-Fraud Policy/A - FINDINGS AND REPORT/A06a 20230811 Counter Fraud
Arrangements Final Report v1.0.docx 12
Appendix 3 (cont’d) – Good Practice Identified in Fighting Fraud and Corruption Locally (FFCL) – A Strategy for the 2020s 
Part 2 – The FFCL Checklist
1. Has the local authority made proper assessment of its fraud and corruption risks, has an action plan to deal with them and regularly reports to its senior Board and
its members?
2. Has the local authority undertaken a fraud risk assessment against the risks and a horizon scanning of future potential fraud and corruption risks?  This should
include the understanding of the harm that fraud may do in the community.
3. Is there an annual report to the audit committee, or equivalent detailed assessment, to compare against FFCL 2020 and the checklist?
4. Has the relevant portfolio holder been briefed on fraud risks and mitigation?
5. Does the audit committee support counter fraud work and challenge the level of activity to ensure that it is appropriate in terms of fraud risk and resources?
6. Is there a counter fraud and corruption strategy applying to all aspects of the local authority’s business which has been communicated throughout the local
authority and acknowledged by those charged with governance?
7. Are risks of fraud and corruption specifically considered in the local authority’s overall risk management process?
8. Are counter fraud staff consulted to fraud proof new policies, strategies and initiatives across departments and is this reported to committee?
9. Are successful cases of proven fraud/corruption routinely publicised to raise awareness?
10. Has the local authority put in place arrangements to prevent and detect fraud and corruption and a mechanism for ensuring this is effective and is reported to
committee?
11. Has the local authority put in place arrangements for monitoring compliance with standards of conduct across the local authority covering codes of conduct, including
behaviour for counter fraud, anti-bribery and corruption; register of interests; and register of gifts and hospitality?
12. Does the local authority undertake recruitment vetting of staff prior to employment by risk assessing posts and undertaking the checks recommended in FFCL 2020
to prevent potentially dishonest employees from being appointed?
13. Are members and staff aware of the need to make appropriate disclosures of gifts, hospitality and business? Is this checked by auditors and reported to
committee?
14. Is there a programme of work to ensure a strong counter fraud culture across all departments and delivery agents led by counter fraud experts?
15. Is there an independent and up-to-date whistleblowing policy which is monitored for takeup and can show that suspicions have been acted upon without internal
pressure?
16. Have contractors and third parties signed up to the whilstleblowing policy and is there evidence of this?
17. Is there any discrimination against whistleblowers?
18. Are fraud resources assessed proportionately to the risk the local authority faces and are they adequately resourced?  
Page 97 of 240

Page 102

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0900.2023.011 - Review of Council's Anti-Fraud Policy/A - FINDINGS AND REPORT/A06a 20230811 Counter Fraud
Arrangements Final Report v1.0.docx 13
Appendix 3 (cont’d) – Good Practice Identified in Fighting Fraud and Corruption Locally (FFCL) – A Strategy for the 2020s 
Part 2 – The FFCL Checklist (cont’d)
19. Is there an annual fraud plan which is agreed by committee and reflects resources mapped to risks and arrangements for reporting outcomes?  Does this plan
cover all areas of the local authority’s business and include activities undertaken by contractors and third parties and voluntary sector activities? 
20. Are statistics kept and reported by the fraud team which cover all areas of activity and outcomes?
21. Do fraud officers have unfettered access to premises and documents for the purposes of counter fraud investigations?
22. Is there a programme to publicise fraud and corruption cases internally and externally which is positive and endorsed by the council’s communications team? 
23. Are all allegations of fraud and corruption risk assessed?
24. Does the fraud and corruption response plan cover all areas of counter fraud work including prevention, detection, investigation, sanction and redress?
25. Is the fraud response plan linked to the audit plan and is it communicated to senior management and members? 
26. Is asset recovery and civil recovery considered in all cases?
27. Is there a zero-tolerance approach to fraud and corruption that is defined and monitored and which is always reported to committee?
28. Is there a programme of proactive counter fraud work which covers risk identified in assessment?
29. Does the counter fraud team work jointly with other enforcement agencies and encourage a corporate approach and co-location of enforcement activity?
30. Does the local authority share data across its own departments and between other enforcement agencies? 
31. Are prevention measures and projects undertaken using data analytics where possible? 
32. Has the counter fraud team registered with the Knowledge Hub so it has access to directories and other tools?
33. Does the counter fraud team have access to the FFCL regional network?
34. Are there professionally trained and accredited staff for counter fraud work?  If auditors undertake counter fraud work, they too must be trained in this area.
35. Does the counter fraud team have adequate knowledge in all areas of the local authority or is it trained in these areas?
36. Does the counter fraud team have access (through partnership/other local authorities/funds to buy in) to specialist staff for surveillance, computer forensics, asset
recovery and financial investigations?
37. Are weaknesses revealed by instances of proven fraud and corruption scrutinised carefully and fed back to departments to fraud-proof systems? 
Page 98 of 240

Page 103

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0550.2023.001 Procurement - Single Tender Responses/A - FINDINGS AND REPORT/A07a
20230623 Procurement - Achieving Best Value final report v1.0 as issued.docx 1 
INTERNAL AUDIT REPORT 
PROCUREMENT – ACHIEVING BEST VALUE 
Contents  
1. Executive Summary 2. Findings and Recommendations 3. Action Plan
Appendix 1: Audit grading Appendix 2: Sample of contracts selected for review
Appendix 3: Procurement route – competition and best value
Appendix 4: Selected performance data 2018-19 to 2021-22
Issued to: Chief Officer (Asset and Procurement)  
Copied to: Procurement and Support Manager, Chief Executive and Depute Chief Executive 
Headlines
The purpose of this audit was to provide assurance on the Council’s procurement arrangements, particularly
in relation to contracts awarded following receipt of a single tender responses.  The Audit and Scrutiny Panel
specifically requested that this work be undertaken following a number of elected members expressing
concerns over an apparent increase in the number of reports to Committees awarding, or seeking approval to
award, contracts where there had only been a single tender response, with consequential concerns about a
lack of competition, whether the Council is securing best value and the risk of anti-competitive behaviour
amongst potential bidders.
Our review involved discussions with the Corporate Procurement Team (CPT) and review of the Council’s
Contract Register, the Annual Procurement Report, relevant Committee reports, and information held on Public
Contracts Scotland (PCS) to identify contracts awarded and the procurement routes used.
The Council's Annual Procurement Report for 2021-22 provides a snapshot of procurement activity for that
financial year with comparison to the previous three years.  Details of the performance figures for four years to
2021-22 are contained at Appendix 4 for information. The performance information in the 2021-22 report  
indicates that there has been an increase in the number of contracts awarded over the last four years with a
significant increase in contracts awarded using the Negotiated Tendering Procedure (NTP) and a reduction in
the use of frameworks.  Additionally, whilst the number of contracts advertised fell between 2018-19 and 2020-
21, there was a slight increase in 2021-22, with no contracts awarded where only one bid was received.  It is
recognised that procurement activity has been impacted by the Covid-19 pandemic and recovery period and
this has been a relevant factor in levels of participation and competition since 2020.  
Based on the results of our work, we have categorised this audit as offering ‘reasonable assurance’.  We
noted that there are a number of different routes for procuring supplies, services and works and are pleased to
note that there are clear expectations and documented guidance available to all Services undertaking
procurement activity.
However, in response to the specific concerns raised by members regarding an apparent increase in the
number of contracts where there has only been a single tender response, our review and analysis of
performance information indicates that there is not a high incidence of single tender responses.  However, we
consider that the way in which procurement outcomes are being reported could be misleading and therefore,
understand why elected members have raised concerns.  We have identified a number of areas where we
consider that there is scope for improvement and these are contained in section 3 of this report.  These include:
• key procurement documentation and reports for contracts awarded need to better convey how best value
has been achieved; and
• performance information in relation to procurement activities could be improved. 
Internal Audit Opinion (see definition at Appendix 1) Reasonable assurance (Green-Amber) 
Organisational impact (see definition at Appendix 1) Minor 
Report status FINAL Audit ref 0550/2023/001 Date issued 23/06/23
Audit Team Lesley Armstrong, Paula Hendry and Jackie Struthers  Page 99 of 240

Page 104

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0550.2023.001 Procurement - Single Tender Responses/A - FINDINGS AND REPORT/A07a
20230623 Procurement - Achieving Best Value final report v1.0 as issued.docx 2 
1.  Executive Summary 
Objectives
The Council’s procurement arrangements are designed to comply with all relevant legal obligations, help ensure
open and transparent competition and deliver best value in the procurement of goods and services.  The
purpose of this audit was to provide information and assurance on the following questions: 
(1) How often are contracts awarded by the Council based on a single tender response?
(2) Has there been any increase in the Council awarding contracts following single tender responses?
(3) Are there particular sectors and/or types of goods and services more affected by single tender responses?
(4) If the frequency of single tender responses has markedly increased or is high in particular areas or
categories, has the Council sought to consider the reasons behind this and whether or how it might respond?
(5) Where contracts are awarded based on single tender responses, do adequate Council processes require
staff to seek to ensure that awarding the contract on that basis represents, and allows the Council to
demonstrate, best value and have these expected processes been followed.
Testing for this audit included discussions with one of the Category Managers within the CPT and review of the
Council’s Contract Register, the Annual Procurement Report, relevant Committee reports, and information held
on Public Contracts Scotland (PCS) to identify contracts awarded and the procurement routes used for each. 
Our review also included examination of the procurement documentation (the pre-tender Contract Strategy,
post-tender Contract Award report and Committee report) for a sample of 20 contracts awarded to confirm that
the expected procurement processes were being followed by Services.  The audit considered all circumstances
where a single contractor was involved in the procurement process, including use of the NTP and where a
single contractor is pursued within an agreed framework/ approved list of suppliers.  The contracts selected for
review are detailed at Appendix 2.
This engagement has been conducted in accordance with the ‘Public Sector Internal Audit Standards’.  The
Internal Audit section reports formally on conformance with these standards to the Audit and Scrutiny Panel. 
2.  Findings and Recommendations 
Number and category of recommendations raised
(see definition of priority at Appendix 1) 
High Medium Low
0 2 2 
Key areas requiring management action (High)
No areas requiring urgent management action have been identified. 
Good practice identified
We noted the following areas of good practice during the audit:
• the CPT is responsible for the co-ordination of strategic procurement for the Council and for supporting
Services with some procurement activities, particularly in relation to high risk/high value contracts;
• the Council has in place General Contract Standing Orders (GCSOs) and associated procurement guidance
which set out the ‘internal rules’ for any arrangements made by, or on behalf of, the Council relating to
supplies, the provision of services and the execution of works;
• the Council has well-established procurement procedures and documentation in place for all procurement
activity over £50,000 for supplies/services or £500,000 for works, which requires all relevant procurements
to be notified to the CPT at the outset, enabling a full record to be centrally maintained and ensuring greater
consistency of approach and compliance with expected processes and legislative requirements;
• there is a Procurement Strategy in place, which is reviewed and updated on annually to reflect any required
changes.  The purpose of the Strategy is to provide an efficient and effective procurement service that
delivers Best Value from procurement activity and where possible, cash savings; provide quality advice and
contracts; and procure supplies, works and services in a lawful and ethical manner; and
• an Annual Procurement Report is prepared and submitted to the Finance and Resources Committee each
year, providing an update on the activity and outcomes delivered through the Procurement Strategy as well
as details of the Regulated Procurements undertaken during the year, annual performance indicators and
other legislative reporting requirements.
Page 100 of 240

Page 105

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0550.2023.001 Procurement - Single Tender Responses/A - FINDINGS AND REPORT/A07a
20230623 Procurement - Achieving Best Value final report v1.0 as issued.docx 3 
Other areas for improvement (Medium)
A number of other areas for improvement were also identified: 
• ‘Below threshold’ reports to committee should be amended to more clearly convey the level of competition
and how best value has been achieved;
• Key procurement documentation and reports for contracts awarded need to better convey how best value
has been achieved; and
• Performance information in relation to procurement activities could be improved. 
Page 101 of 240

Page 106

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0550.2023.001 Procurement - Single Tender Responses/A - FINDINGS AND REPORT/A07a 20230623 Procurement - Achieving Best Value final report v1.0 as issued.docx
4
3. Action Plan Procurement – Achieving Best Value 0550/2023/001 
Ref Finding
1 Key procurement documentation and reports for contracts awarded need to better convey how best value has been achieved.
For contracts which require to be notified to the CPT, the procuring Service is required to prepare a pre-tender Contract Strategy/NTP Strategy, and a post-tender Contract
Award report and Committee report (either individual or summary report depending on contract value).  For contract extensions, a Contract Extension Request must be prepared. 
For the sample of contracts reviewed (see Appendix 2), we obtained copies of the relevant strategy documents and reports and identified the following areas for improvement:
• We consider that the justification provided on the NTP Strategy for three contracts selected was not reasonable and could have been more detailed to fully explain why the
contract could not be provided by other contractors and how the NTP represents best value.  
• For contracts awarded using the open procurement route (advertised on PCS) and mini competition from a framework, where only one bid is received, the Contract Award
and Committee report did not clearly indicate, in the main body of the report, that only one bid was received and did not sufficiently justify the reasons for continuing to award
the contract despite only one bid being received (i.e. what the Service did to satisfy themselves that the Council is getting best value and there were no issues with the tender
process).  Additionally, the reports for these contract awards generally state that the contract was awarded based on most economically advantageous tender, however, we
consider that this is not valid if only one tender is received as there are no other bids for comparison.
• For contracts awarded as a result of a direct award from a framework agreement, we consider that the Contract Award reports could provide more detail to justify the decision
for the selected contractor and demonstrate best value (e.g. best prices on contract).  For one contract, the Contract Award report was only issued by the Service after
discussion as part of our testing and the report issued did not provide the appropriate justification for selecting the contractor and was not signed by either the Service or
CPT.
• A Contract Award report was not prepared for two of the NTPs reviewed.  There appears to be uncertainty within Services around whether such a report is required for NTPs,
particularly where the contract has been awarded due to extreme urgency.
• Section 9.5 of the GCSOs requires all NTP contracts to be reported to committee explaining the circumstances justifying the use of the NTP procedure.  For one of the
contracts reviewed, the contract was only reported to committee as part of the below threshold report, therefore there was no requirement to provide justification for the use
of the NTP procedure.  Additionally, the committee reports did not always provide appropriate justification for the use of the NTP procedure as the report template only refers
to the NTP Strategy and does not require a detailed explanation.
• Contract Extension Requests were completed for all extensions in the sample; however, we consider that the documentation could provide more detail and justification for
extending the contract and how the extension represent best value to the Council.
Implication Recommendation Priority
The Council may fail to
demonstrate best value is
being secured by its
procurement processes.
Management is unaware of
the extent of compliance with
key corporate expectations
and/or may fail to identify
issues requiring action.
The Chief Officer (Asset and Procurement) should:
(1) for contracts with a single tender response, update the Contract Award and Committee report templates to clearly require, in the
main body of the report, commentary which highlights where only one bid was received and explains the rationale for continuing
to award the contract; 
(2) reinforce to Services the requirement to complete Contract Strategy documents, Contract Award reports and Committee reports,
including clear and sufficiently detailed justification of why the procurement route was selected and how the proposed contract
award delivers best value; 
(3) review, and amend as appropriate, the Contract Extension Request to require Services to more fully justify the reasons for
extending contracts and how/whether this represents best value for the Council; and
(4) ensure that prior to signing off relevant completed procurement documentation, the CPT review and challenge the content to
ensure compliance with expected practice. 
Medium 
Page 102 of 240

Page 107

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0550.2023.001 Procurement - Single Tender Responses/A - FINDINGS AND REPORT/A07a 20230623 Procurement - Achieving Best Value final report v1.0 as issued.docx
5
3. Action Plan Procurement – Achieving Best Value 0550/2023/001 
Management response Implementation
Month/Year
Agree
Brian Ferguson, Procurement and Support Manager
(1) The CPT will update the contract award and committee report template with a useable paragraph (if applicable) for the Procuring Service to outline
rationale in awards where there is a single tender response.  In considering this the CPT will ensure that the Council’s commercial position is not
compromised or negatively impacted, particularly where the market is weak and/or there are low number of contractors.
(2) and (3) The CPT will communicate updates to templates through the established CPWG and Procurement Network.  This will enable the targeting of the
correct officers and provide appropriate awareness to the reasons behind the need for updates.
(4) The CPT will consider relative checks in accordance with the recommendation and incorporate this within the procurement improvement plan 2023/24. 
November 2023 
November 2023
April 2024 
Page 103 of 240

Page 108

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0550.2023.001 Procurement - Single Tender Responses/A - FINDINGS AND REPORT/A07a 20230623 Procurement - Achieving Best Value final report v1.0 as issued.docx
6
3. Action Plan (continued) Procurement – Achieving Best Value 0550/2023/001 
Ref Finding
2 Performance information in relation to procurement activities could be improved.
Under the Council’s agreed approach to procurement, Services are responsible for undertaking the significant majority of procurements, ensuring that these are progressed in
accordance with the GCSOs and associated guidance.  The CPT provides a central source of expertise, advice and support, providing checks and challenge as appropriate. The
CPT also supports Services to deliver some of the more complex or sensitive procurements. 
The Procurement Reform (Scotland) Act 2014 requires the Council to prepare an annual procurement report on regulated procurement activity (over £50,000 for supplies and
services and £2 million for works).  The CPT prepare and submit an annual report to the Finance and Resources Committee in September each year providing an update on the
activity and outcomes that have been delivered through the Procurement Strategy during the previous financial year and evaluating the extent to which regulated procurement
activity was undertaken in accordance with the Council’s Procurement Strategy.  The report contains performance information, including statistics on the procurement routes
used.  
There is, however, a range of procurement activity below the regulated procurement thresholds, undertaken by Services, for which performance information is not currently
collated, analysed and/or monitored by the CPT.  As a result, any potential issues and/or actions required are not routinely identified/determined and information is not routinely
reported.  This represents a gap in current management arrangements.  We consider there is a need for relevant indicators to allow management to report to key stakeholders
on all contracts that are notified to CPT.
We requested documentation from the Service to support some of the percentages included in the 2021-22 annual procurement report, however, this was not readily available. 
We, therefore, calculated the figures for 2021-22 using the list of regulated procurements contained in the report, the contract register and information contained on Public
Contracts Scotland (PCS).  We identified some differences, including contracts reported to committee and/or included in the annual report which were not included in the contract
register (and vice versa) and differences in the split of contracts by procurement route.  We also noted that the main body of the annual report does not provide an analysis of the
statistics included in the appendices (i.e. trends over years/Services or reasons for changes) to highlight any possible areas requiring management attention and/or any actions
required/being taken to address any issues arising.
As a result of the enquiries from Elected Members about single tender responses, the CPT prepared information on all contracts awarded over the last five years, by Service area
and procurement route.  These statistics only included contracts with single tender responses and did not indicate the contracts awarded after receiving more than one tender
response, therefore we were unable to determine the proportion of contracts awarded from single tender responses against all contracts awarded.  These statistics have only
recently been prepared for internal management purposes and there are, we understand, currently no plans in place to routinely monitor and/or report these figures to the
Corporate Procurement Working Group (CPWG) or Committee.
Implication Recommendation Priority
Without formal documented analysis, key
stakeholders may have no basis to make
decisions and/or identify any areas for concern
and/or requiring management attention.
A lack of documentation to support reported
performance measure could result in figures
being calculated inconsistently which could
result in difficulty comparing performance over
different years and/or inaccurate reporting
and/or interpretation of results.
The Chief Officer (Asset and Procurement) should:
(1) review the format of the Committee Paper that accompanies the Annual Procurement report and consider
including an analysis of the performance measures to highlight any areas of concern and actions required/taken
to address these issues;
(2) consider and identify a condensed suite of indicators which would allow for the measurement, analysis and
reporting of all procurement activity notified to the CPT including relevant indicators to capture procurement
exercises which did/did not involve competition and ensure that this is subject to regular review to identify any
trends and/or potential issues within particular sectors and/or goods/services, investigate the reasons for these
and take appropriate action to resolve; and
(3) ensure that performance information is calculated in a clear and consistent manner and that documentation to
support the calculation of all performance measures is retained. 
Medium    
Page 104 of 240

Page 109

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0550.2023.001 Procurement - Single Tender Responses/A - FINDINGS AND REPORT/A07a 20230623 Procurement - Achieving Best Value final report v1.0 as issued.docx
7
3. Action Plan (continued) Procurement – Achieving Best Value 0550/2023/001 
Management response Implementation
Month/Year
Agree
Brian Ferguson, Procurement and Support Manager
(1) The CPT will review and refine the Committee Paper for members that accompanies the Annual Procurement Report.  Given the Annual Report 2022/23 is
due to be presented soon this action will be complete for the next annual report covering 2023/24.
(2) The CPT structure and resource currently in place is relative to the Council’s devolved procurement model and is set up to meet the requirements of the
GCSO’s which has exemptions in procedures for lower value procurement activity.  To fully address this recommendation will require a change in the GCSOs
to require Chief Officers to submit Registers of Quotations to CPT and CPT would need a resource to manage this.  There is however a willingness for CPT
to work with Services to obtain more thorough feedback on lower threshold procurement/contracting activity, but this will take time and resource to work
through.
(3) The CPT will review data capture, reporting and checking of performance information for incorporating into the 2023/24 Annual Procurement Report. 
September 2024 
April 2024 
September 2024 
Page 105 of 240

Page 110

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0550.2023.001 Procurement - Single Tender Responses/A - FINDINGS AND REPORT/A07a 20230623 Procurement - Achieving Best Value final report v1.0 as issued.docx
8
3. Action Plan (continued) Procurement – Achieving Best Value 0550/2023/001 
Ref Finding
3 ‘Below threshold’ reports to committee should be amended to more clearly convey the level of competition and how best value has
been achieved.
Section 2.6 of the GCSOs states that all contracts must secure best value and the Council’s Procurement Strategy defines best value as ‘overall value, including price and quality
considerations and including economic, environmental and social value’.  Additionally, section 5.1.1 of the GCSOs states that all contracts in excess of £50,000 for suppliers and
services and £500,000 for works may only be awarded after steps have been taken for the purpose of ensuring genuine competition by seeking tenders by public advertisement
(with the exception of contracts awarded where the use of the NTP route is justified).  There are various procurement routes for undertaking procurement exercises with varying
degrees of competition and these are detailed at Appendix 3.  However, there may be times where, despite selecting a procurement route which involves an appropriate degree
of competition, only one bidder responds resulting in an unexpected lack of competition as there are no other bids for comparison to enable an assessment of best value. 
The Corporate Procurement Team (CPT) should be notified of all contracts exceeding £50,000 for supplies and services and over £500,000 for works and record these on the
Contract Register.  In line with the GCSOs, the Chief Officer (Asset and Procurement) is required to prepare and submit a summary report to the appropriate committee notifying
all contracts awarded below committee thresholds (between £50,000 and £500,00 for supplies and services and £500,000 and £2 million for works).  
These reports contain an appendix which includes details of each contract awarded, including the procurement route used and number of tenders received.  For contracts awarded
using the direct award, negotiated tender process (NTP), open/restricted/mini competition where only one bid is received, and contract extensions, the number of tenders received
is recorded as ‘1’, indicating that only one response/bid was received.  We noted that these summary reports do not define what is classed as a single tender response and which
procurement routes fall into this category and why.  As the contracts for some of these procurement routes have previously been subject to competition (as part of a framework
or the original contract), we consider that recording the number of tenders received as ‘1’ could be misinterpreted by Elected Members that more contracts have been accepted
without any competitive element to the procurement process than is actually the case.  We also consider that the current format of the report does not clearly indicate, for those
contracts with a single bid response, how best value has been considered and achieved.
Implication Recommendation Priority Management response Implementation
Month/Year
The current format of the ‘below
threshold’ committee reports could be
misleading and could lead readers to
conclude that more contracts are
being awarded with single tender
responses than actually are.
The Chief Officer (Asset and Procurement) should
review and update the current format of the ‘below
threshold’ committee report to ensure that it clearly
indicates the level of competition that each contract has
been subject to, and for those contracts with only a
single bid, outlines how best value has been
considered and achieved.  This could be facilitated
through the use of separate tables within an appendix
to the report for each procurement route.
Low  Agree
Brian Ferguson, Procurement and Support
Manager
The CPT will update the below threshold template
for reporting so that there is more clarity for the
reader to better understand best value
considerations/levels of competition.   
November 2023  
Page 106 of 240

Page 111

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0550.2023.001 Procurement - Single Tender Responses/A - FINDINGS AND REPORT/A07a 20230623 Procurement - Achieving Best Value final report v1.0 as issued.docx
9
3. Action Plan (continued) Procurement – Achieving Best Value 0550/2023/001 
Ref Finding
4 Performance information in respect of contracts awarded following a single response to a tender has been incorrectly calculated. 
We previously reported, in the Internal Audit report on Procurement (dated 25/11/21), that the figures for the performance measure contained within the Annual Procurement
Report 2020/21 relating to ‘contracts awarded further to an advertised contract opportunity that resulted in only one bid being received’ was calculated incorrectly based on the
definition.  The Service had calculated this measure as 8 advertised tender opportunities that received only one bid from a total of 80 procurements.  We consider that the
denominator used in the calculation of this performance measure is incorrect and is not consistent with the performance measure definition, as it is based on the total number of
Regulated Procurements as opposed to the number of Regulated Procurements which were advertised only.  If the correct denominator had been used, the percentage figure
would be 25% (i.e. 8 advertised tender opportunities that only received one bid from a total of 32 advertised tender opportunities).  
Agreement was received from management that they would review the processes in place to ensure that all future performance measures contained with the Annual Procurement
Report would be accurately and consistently calculated in line with the definition.  However, based on our work undertaken during this audit, we noted that the previous year
figures contained in the Annual Procurement Report 2021/22 were consistent with the 2020/21 report and had not been amended to accurately reflect the correct calculation of
the performance measure.  We also noted that some of the performance measure definitions contained in the annual report were stated as ‘number of’ whilst the figures provided
were percentages.
Implication Recommendation Priority Management response Implementation
Month/Year
If performance measures are not
correctly calculated in line with the
definition, management and
elected members may misinterpret
the information presented to them
and may not raise appropriate
questions.
The Chief Officer (Asset and Procurement) should ensure
that all figures for all performance measures contained
within future Annual Procurement Reports are accurately
and consistently calculated and recorded in line with the
corresponding definition, and that where errors/changes are
identified, any previous year figures are updated
accordingly.
Low Agree
Brian Ferguson, Procurement and Support
Manager
The CPT will ensure this recommendation is
addressed in its Annual Procurement Report
2022/23 to be presented to Committee in cycle 3. 
September 2023 
Page 107 of 240

Page 112

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0550.2023.001 Procurement - Single Tender Responses/A - FINDINGS AND REPORT/A07a 20230623
Procurement - Achieving Best Value final report v1.0 as issued.docx 10
Appendix 1 - Audit Grading
Audit reports are graded with an overall assurance opinion, and any issues and associated
recommendations are classified individually to denote their relative importance, in accordance with the
definitions in the tables below. 
Definition of audit assurance and recommendation categories
Assurance Confidence based on sufficient evidence that internal controls are in place, operating
effectively and objectives are being achieved. 
Assurance opinion
Green Substantial
Assurance
A sound system of governance, risk management and control exists, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Green-Amber Reasonable
Assurance
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for improvement were
identified which may put at risk the achievement of objectives in the area
audited.
Amber-Red Limited
Assurance
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management and
control to effectively manage risks to the achievement of objectives in the
area audited.
Red No
Assurance
Immediate action is required to address fundamental gaps, weaknesses or
non-compliance identified. The system of governance, risk management and
control is inadequate to effectively manage risks to the achievement of
objectives in the area audited. 
Organisational impact
Major The weaknesses identified during the review have left the Council open to significant risk.  If
the risk materialises it would have a major impact upon the organisation as a whole.
Moderate The weaknesses identified during the review have left the Council open to medium risk.  If the
risk materialises it would have a moderate impact upon the organisation as a whole.
Minor The weaknesses identified during the review have left the Council open to low risk.  If the risk
materialises it would have a minor impact upon the organisation as a whole. 
Recommendation priority
High
Significant control failure or weakness that, if not addressed, may lead to a major financial,
operational or reputational risk to the organisation and/or significantly impact the successful
delivery and achievement of the objectives of the area under review.  Urgent/Immediate action
is required.
Medium
Control failure or weakness that, if not addressed, may lead to a moderate financial,
operational or reputational risk to the organisation.  Weakness may be individually significant
but is unlikely to affect the successful delivery and achievement of the overall objectives of the
area under review.  The risk of error would, however, be significantly reduced if corrective
action was taken.  Prompt action is required.  
Low
Control failure or weakness that may lead to a minor financial, operational or reputational risk
to the organisation.  Weakness does not appear to significantly affect the ability to meet
objectives.  Minor issue raised to improve the efficiency and effectiveness of controls. 
Page 108 of 240

Page 113

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0550.2023.001 Procurement - Single Tender Responses/A - FINDINGS AND REPORT/A07a 20230623
Procurement - Achieving Best Value final report v1.0 as issued.docx 11
Appendix 2 – Sample of contracts selected for review 
CPT Reference Contract Name Award
Date Contract Value Service Type
NLC-CPT-21-004
Decommissioning of Housing
Property Low Rise Roof Anchors in
North Lanarkshire
30/04/21 £823,369.43 Housing Property
Services Open
NLC-CPT-21-045 MTC UPVC Door and Window
Repairs and Maintenance 2022-2026 28/04/22 £7,500,000.00 Housing Property
Services Open
NLC-CPT-21-112 MTC: Water Quality Assessment and
Lead Mains Replacement 2022-24 11/04/22 £1,899,999.99 Housing Property
Services Open
NLC-SLP-22-012 BA Childhood Practice Course 27/10/22 £290,137.50 Education Open
NLC-SLP-22-046
Glencryan School, Cumbernauld -
Rewire, Fire Stopping &
Redecoration
14/12/22 £1,298,988.23
Assets and
Procurement
(Contract Support)
Open
NLC-CPT-21-108 Allanton Primary School 15/11/21 £764,066.91 Assets and
Procurement  NTP
NLC-CPT-21-055 Distress Brief Intervention 24/06/21 £211,250.00 Adult Social Work NTP
NLC-CPT-22-020 Route Optimisation and In-Cab
Technology Solution 2022-25 01/05/22 £69,083.00 Community
Operations (Waste) NTP
NLC-NTP-22-049
Professional and Technical Support:
Environmental Improvements and
Community Engagement
14/10/22 £80,000.00 Community
Operations (Roads) NTP
NLC-NTP-22-040 Low Rise Fire Door Programme 16/11/22 £8,000,000 Housing Property NTP
NLC-CPT-21-067 Purchase of Fuel Cards  03/12/21 £162,205.92 Community
Operations (Fleet)
Direct
Award
NLC-CPT-21-136 Supply and Delivery of CO2 Monitors 02/02/22 £229,500.00 Education Direct
Award
NLC-CPT-22-052 Supply and Distribution of Frozen
Foods 2022-2026 08/08/22 £8,340,000.00
Assets and
Procurement
(Facility Support
Services)
Direct
Award
NLC-SLP-22-057 Design and Install of Electronic Signs
2022-24 23/11/22 £1,000,000.00 Place Direct
Award
NLC-SLP-22-075 Provision of Support for People
Affected by Huntingdon’s Disease 01/04/22 £398,898.00 Adult Social Work Direct
Award
NLC-CPT-21-111
Provision for Occupational Health
Services and Employee Assistance
Programme
01/06/22 £2,775,000.00 People Resources Mini
Comp
NLC-CPT-21-167 Cashless Catering Solution and
Online School Payments 17/06/22 £1,752,140.00
Assets and
Procurement
(Facility Support
Services)
Mini
Comp
NLC-CPT-19-015 Provision of Winter Related Services
Lots 1 and 2 21/07/22
Extension Value – 
£192,500.00
(Contract Value –
£770,000.00)
Assets and
Procurement Extension
NLC-CPT-20-033
MTC: Controlled Door Access
Systems and Associated Works,
Repairs and Maintenance 2020-23
15/09/22
Extension Value –
£350,000.00
(Contract Value –
£1,050,000.00)
Housing Property
Services Extension
NLC-CPT-21-022 Contract Progress
Analyse/Programmer 16/03/22
Extension Value –
£178,962.50
(Contract Value –
£357,925.00)
Housing Property
Services Extension
Page 109 of 240

Page 114

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0550.2023.001 Procurement - Single Tender Responses/A - FINDINGS AND REPORT/A07a 20230623 Procurement - Achieving Best Value final report v1.0 as issued.docx
12
Appendix 3 – Procurement Route – Competition and Best Value 
Procurement Route Competition
(Yes/No) Internal Audit consideration of how route demonstrates Best Value
(1) Open (multiple bids
received) Yes Single stage tender process.  Contract openly advertised on Public Contracts Scotland (PCS) with stated quality criteria and scoring
and awarded to contractor with the most economically advantageous tender (MEAT) i.e. the Contractor with the highest price and
quality score combined based on an agreed price/quality ratio. Any Contractor can participate in the competition.
If only one bidder responds, there will be a lack of competition as no other bids for comparison or to enable assessment of best value. (2) Open (single bid received) No
(3) Restricted (multiple bids
received) Yes Two stage tender process.  Contract openly advertised on PCS with initial assessment of bidders’ capability, capacity and experience
to perform the contract to identify a manageable number of contractors (usually 5-8) for issuing with Invitation to Tender.  Contract
awarded to contractor with MEAT i.e. the Contractor with the highest price and quality score combined based on agreed price/quality
ratio. Any Contractor can participate in the competition.
If only one bidder responds, there will be a lack of competition as no other bids for comparison or to enable assessment of best value.
(4) Restricted (single bid
received) No
(5) Negotiated Tender Process
(NTP) No
Identification of a single contractor and entering into negotiations to deliver contract.  No advertisement of contract.
The procurement regulations set a specific condition for directly awarding contracts this way due to extreme urgency brought about
by events that could not have been foreseen, e.g., securing a contractor to urgently supply medical goods (as required during the
pandemic necessary to allow frontline services to be carried out), or to address a critical failure. 
The procurement regulations also set out other conditions for directly awarding contracts on a negotiated basis (NTP) whereby the
NTP was necessitated due to a failed tender process (open or restricted) that received either no bids that were unable to meet the
requirements; or insufficient number of bids to demonstrate best value.
(6) Framework Agreement Yes Multi supplier agreement.  Framework openly advertised with all bids reviewed based on quality and price with selected contractors
awarded a place on the framework.
(7) Call-Off from Framework:
Mini Competition Yes
Selection of contractors from framework issued with Invitation to Tender and contract awarded to contractor with MEAT based on
agreed price/quality ratio.  Quality evaluation from framework can be used to establish quality score.
If only one bidder responds, there will be reduced competition as no other bids for comparison or to enable assessment of best value.
(8) Call-off from Framework:
Direct Award 
Yes, when
established on
the framework
Selection of single contractor from framework, usually contractor with highest price/quality score. 
No competition at point of contract award, competition undertaken to become established on the relevant framework.
Note - some frameworks may have multiple contractors and the offerings available through the framework are very clear i.e. contain
a price list for a range of supplies with each contractor, which allows the procuring service to quickly identify which Contractor will
represent best value for their requirements. This would be a further reason for Direct Award.
(9) Extension
Dependent on
competition at
point of
original
contract award
Extension to existing/original contract which included option to extend.  No competition at contract extension, extent of competition at
point of original contract award dependent on procurement route originally followed.  Contractor must continue to meet selection
requirements, have had satisfactory performance during original contract period and extension must secure best value. 
Page 110 of 240

Page 115

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Planned Work/2022-23/0550.2023.001 Procurement - Single Tender Responses/A - FINDINGS AND REPORT/A07a 20230623
Procurement - Achieving Best Value final report v1.0 as issued.docx 13 
Appendix 4 – Selected performance data: 2018-19 to 2021-22
Source: Annual Procurement Report 2021-22 
Regulated Procurements -
Type
2021/22 2020/21 2019/20 2018/19
Number % Number % Number % Number %
Third Party Framework: Direct
Award 18 22% 28 35% 20 27% 13 19%
Third Party Framework: Mini
Competition 13 15% 7 9% 17 22% 16 24%
Advertised Contracts: Open
and Restricted 38 45% 32 40% 33 44% 37 56%
Negotiated Tender Process 15 18% 13 16% 5 7% 1 1%
Total 84 100% 80 100% 75 100% 67 100%
Percentage of advertised
contracts that resulted in only
one bid
0 0% 8 10%
(Note 1) 7 9%
(Note 1) 2 3%
(Note 1) 
Note 1: The Internal Audit report on Procurement (dated 25/11/21) identified errors in the calculation of the percentage of
advertised contracts that resulted in only one bid as an incorrect denominator was used in the calculation.
The correct percentages (based on advertised contracts that resulted in only one bid / all advertised contracts) are: for
2020-21 – 25%, 2019-20 – 21% and 2018-19 – 5%.  See action plan point 4 above.
Page 111 of 240

Page 116

Page 112 of 240

Page 117

North Lanarkshire Council
Report
Audit and Scrutiny Panel
Does this report require to be approved? ☐ Yes   ☒ No
Ref KA/LM/ASP/September 2023    Date 04/09/23
Internal Audit: Follow up of actions previously agreed by
management in response to audit recommendations 
From  Ken Adamson
E-mail adamsonk@northlan.gov.uk Telephone 07939 280602 
Executive Summary
The purpose of this report is to update the Panel on the results of Internal Audit’s follow-up
work reviewing the extent to which management have implemented actions previously
committed to in response to previous Internal and External Audit recommendations.
Information is contained in respect of the last two years External Audit outputs and those
actions agreed in response to ‘High’ and ‘Medium’ Internal Audit recommendations which
were due to be completed in the period up to the end of June 2023.
The Panel should note that where actions are not yet ‘complete’ this does not mean that no
relevant activity has been undertaken by management and that the actions taken/progress
made to date will often have reduced the risk exposure in respect of the weaknesses
previously identified even if the action is not yet complete.
Those recommendations which were previously reported to the Panel as partially
implemented but not yet complete are now monitored against revised target implementation
dates agreed with management and previously reported to the Panel.
Seven of the 12 actions agreed in respect of External Audit outputs have been completed,
three are partially implemented, one is not yet due and one is no longer relevant.  Four of the
19 actions agreed in response to relevant Internal Audit recommendations due in the period
have been fully completed and 15 have been assessed as partially implemented.
Recommendations
The Panel is invited to:
(1) note the contents of this report;
(2) note the recommendations made by Internal Audit at Appendix 1; and
(3) consider whether there are any issues arising from this report on which they wish to
receive further information from relevant management.
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Item 7
Page 113 of 240

Page 118

1. Background
1.1 Internal and External Audit reports contain management responses to audit
recommendations which generally include a commitment to specific actions by a stated
date.  This report presents an overview of progress by management in addressing all
External Audit recommendations made in the last two years and all ‘High’ and ‘Medium’
Internal Audit recommendations which were previously reported as outstanding or
where the proposed actions were due to be completed by the end of June 2023.
1.2 The format of this report is designed to allow the Panel to focus on those issues where
non-implementation of agreed actions presents the most significant ongoing risk to the
Council and to enable the Panel to hold relevant senior management to account.
1.3 Internal Audit’s arrangements for following-up audit recommendation include, in certain
circumstances, agreeing a revised implementation date and monitoring and reporting
against these revised dates where we are provided with a strong rationale for the non-
implementation of the audit recommendation by the originally agreed date.  This avoids
repeatedly reporting and focusing on actions which are ‘late’ where there are sound
reasons for non-implementation by the originally agreed date.
1.4 This report presents the assessment of the potential risks arising from those planned
actions agreed in response to Internal Audit recommendations due in the period (April
to June 2023) which are not yet fully completed.
1.5 The updates from management on progress to date have been verified on a sample
basis by Internal Audit as part of the preparation of this report.  However, it should be
noted that this review has focused on whether planned actions have been completed
and has not included detailed substantive testing of whether the implemented actions
have been effective in addressing previously identified weaknesses. 
2. Report
Actions previously agreed by management – Internal Audit recommendations
2.1 Table 1 below shows whether management have implemented those actions previously
agreed to in response to ‘High’ and ‘Medium’ Internal Audit recommendations which
were due to be completed by the end of June 2023.  Overall, four of the agreed actions
have been completed and 15 have been assessed as partially implemented.
Table 1
Complete Partially
implemented
No longer
relevant Total Chief Officer Area
Asset and Procurement 1 0 0 1
Audit and Risk 0 3 0 3
Business and Digital 0 2 0 2
Education 1 3 0 4
Finance 1 1 0 2
Legal and Democratic 0 1 0 1
People Resources 1 4 0 5
Place 0 1 0 1
TOTAL 4 15 0 19
2.2 Internal Audit has reviewed the management updates and agreed with relevant
management revised implementation dates for all 15 recommendations listed as
partially implemented at Table 1.  These recommendations will now be monitored in
Page 114 of 240

Page 119

line with the agreed revised date and will be reported back to the Panel in accordance
with this revised timescale, at which time consideration will be given as to whether
previously identified weaknesses have now been addressed.
2.3 Detail in respect of each of these recommendations and the current residual risk
assessed by Internal Audit because of partial implementation is provided in Appendix
1, in which we have also made suggestions as to how the Panel may wish to consider
these issues.  Definitions of the residual risk ratings are provided at Appendix 2.
Actions previously agreed by management – External Audit recommendations
2.4 Table 2 shows the status of actions agreed by management in response to External
Audit reports issued as part of the 2020-21 and 2021-22 audits.  Internal Audit has
concluded that seven of the agreed actions have been completed, three have been
partially implemented, one is not yet due and the remaining action is no longer relevant.
Table 2
Completed Partially
implemented
Not yet
due
No longer
relevant Total
Report Title/Year
2020-21
Interim Audit Report 3 0 0 1 4
Annual Report 3 0 0 0 3
2021-22
Annual Report 1 3 1 0 5
TOTAL 7 3 1 1 12
2.5 The External Audit action assessed as ‘no longer relevant’ relate to issues on which
External Audit have made a similar recommendation in a subsequent audit report. 
3. Measures of success
3.1  Internal Audit report each cycle to the Audit and Scrutiny Panel on the progress made
by management in implementing actions previously committed to in response to
Internal and External Audit reports   
4. Supporting documentation
Appendix 1 Internal Audit recommendations: Management actions assessed as ‘not
yet complete’ in this cycle
Appendix 2   Residual risk rating definition 
Ken Adamson, Chief Officer (Audit and Risk) 
Page 115 of 240

Page 120

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact because of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a summary of the key risks and potential impacts, highlighting
where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project
Risk Registers), and how they are managed?
Failure by Services to address previously identified issues and/or weaknesses will
impact on the effectiveness of the relevant control framework.  This, depending on
the nature of the issue, will be captured and should be reflected in the relevant
service risk register or the corporate risk register (as appropriate).
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒
Page 116 of 240

Page 121

Appendix 1 Internal Audit recommendations - Management actions assessed as ‘not yet complete’ in this cycle
Chief Officer
Report
Details
Details from original recommendation Current position per management update
Original and
revised
timescales
Internal Audit comment
Chief Officer (Audit and Risk)
Risk
Management
(July 2022)
Risk: The absence of a fully documented corporate
risk register, subject to regular monitoring and
challenge may mean that key stakeholders may fail to
fully understand the key risks the Council faces and in
turn may consequently fail to take appropriate action to
mitigate them.
Recommendation: The Head of Audit and Risk should
ensure that the replacement and/or new corporate
risks detailed in the finding are documented, assessed
and moved to ‘live’ status with a reasonable timescale.
Category: Medium
The corporate risks on Supply Chain and the Scottish Child
Abuse Inquiry have been developed, agreed and are now
‘live’.
The corporate risk in relation to the National Care Service
proposals has been documented as much as can be based
on current information available and scored accordingly. 
This will continue to be developed as the national policy
direction progresses and the current significant level of
uncertainty hopefully begins to reduce.
The corporate risk on Educational Outcomes has been
finalised and a report on this matter is included as a separate
agenda item at the May meeting of the Audit and Scrutiny
Panel.
The corporate risk on the Target Operating Model is
currently in draft format and will be finalised, after the holiday
period, in consultation with relevant stakeholders.
Original
timescale:
September
2022 
Revised
timescale:
December
2022 
Further
revised
timescale:
September
2023
Whilst we acknowledge that there has
been significant activity to address the
recommendations, we note that the
corporate risk on the Target Operating
Model is still very much in ‘draft’ format
and has not, yet, been updated to reflect
the new Programme of Work. 
Given that further action is required to
finalise this action, we have assessed the
residual risk as ‘High’ and consider it
appropriate that the remaining risk is
finalised in line with the revised timescale.
Accordingly, we would suggest that the
Panel may wish to consider requesting a
further update from relevant senior
management at the next meeting of the
Panel.
Risk: Without appropriate training, staff may not be
aware of their roles in respect of risk management.
Recommendation: The Head of Audit and Risk
should:
(1) remind Services of the need to complete and
monitor uptake of the mandatory risk management
training by staff;
(2) determine how best to capture/monitor the uptake
of mandatory training module for each Service and
the Council as a whole in accordance with
expected timescales, ensuring that this is regularly
monitored, and action taken as appropriate on any
issues arising, by the Corporate Risk Team and
RMCWG; and
(3) ensure the risk network training is finalised and
implemented within a reasonable timescale.
Category: Medium
Services have been reminded of the need to complete and
monitor uptake of mandatory risk training.
Data on the uptake of the mandatory risk management
training module is now available and the RMCWG members
will now seek to agree and implement an approach to
monitor the uptake. 
Significant training activity has been undertaken across
Services to ensure that staff with key roles as part of
Services wider Risk Networks are aware of their roles,
responsibilities and key expectations.  Further catch-up
sessions are planned to ensure that all relevant staff who
have key roles have had the opportunity to access required
training.
Original
timescale:
October 2022 
Revised
timescale:
June 2023 
Further
revised
timescale:
October 2023
Having considered the update provided by
management and evidence provided, we
consider points (1) and (3) of the
recommendation to be complete.  Whilst
there has been significant action taken in
relation to point (2), further action is
required to finalise and implement the
approach to monitor the uptake of
mandatory risk management training.
We consider the revised timescale to be
reasonable and have assessed the
residual risk for this recommendation as
‘Low’. 
Accordingly, we would suggest that the
Panel may simply wish to consider
agreeing to note the progress made and
the revised completion date. Page 117 of 240

Page 122

Appendix 1 (continued) Internal Audit recommendations - Management actions assessed as ‘not yet complete’ 
Chief Officer
Report
Details
Details from original recommendation Current position per management
update
Original and
revised
timescales
Internal Audit comment
Chief Officer (Audit and Risk)
Risk
Management
(July 2022)
Risk: Management may lack assurance on the extent
to which key expectations/requirements contained in
the strategy are being complied with.
Without formal processes in place for reporting issues,
management may not be able to take appropriate or
timely action to address these risks.
Recommendation: The Head of Audit and Risk should
ensure that:
(1) work continues to develop a framework, including
suitable KPIs, to appropriately monitor compliance
with key aspects of the Risk Management Strategy,
with areas for improvement being captured and
thereafter tracked and monitored; and
(2) clear expectations regarding consideration,
monitoring and reporting of risk are incorporated
into the revised Risk Management Strategy so that
Services can incorporate this into their individual
governance arrangements.
Category: Medium
A compliance strategy has now been developed
and was incorporated into the revised Risk
Management Strategy which was presented to
the Policy and Strategy Committee in March
2023.
Guidance has now been issued to enable
Service Management Teams (SMTs) to receive
regular reports which provide a mechanism for
senior management to receive information on
risks and assess their own compliance with
corporate expectations.
The timetable and plan of compliance activity
expected in 2023 has been prepared and will be
implemented throughout the remainder of 2023-
24 in line with specific timescales.
Original
timescale:
December 2022 
Revised
timescale:
April 2023 
Further revised
timescale:
March 2024
We acknowledge that there has been significant
action taken to address the recommendations
made and that the compliance strategy is now
incorporated in the revised Risk Management
Strategy but consider it important that the
timetable and plan of compliance activity is
implemented in line with the expected timescales.
We consider the revised timescale to be
reasonable and have assessed the residual risk
for this recommendation as ‘Low’. 
Accordingly, we would suggest that the Panel
may simply wish to consider agreeing to note the
progress made and the revised completion date. 
Page 118 of 240

Page 123

Appendix 1 (continued) Internal Audit recommendations - Management actions assessed as ‘not yet complete’ 
Chief Officer
Report
Details
Details from original recommendation Current position per management
update
Original and
revised
timescales
Internal Audit comment
Chief Officer (Business and Digital) 
Governance of
Capital
Projects
(December
2019) 
Risk: If Services are aware of the projects
which will be reviewed, they are more likely to
follow the guidance for those projects and the
results of any such reviews may not provide a
true representation of the extent of
compliance with expected arrangements,
including use of the relevant guidance and
control template documents.
Recommendation: Management should
review the ‘project management model review
programme’, particularly in relation to:
• expanding the sample of projects being
reviewed to incorporate some capital and
non-capital projects that Services have
not received advance notification; and
• reviewing and updating the checklist to
include consideration of the adequacy
and effectiveness of the completed
control document templates,
determination of whether established
processes have been documented and
confirmation that key stakeholders have
been adequately updated on the progress
of the project, in line with the suggested
improvements at Appendix 3.
Category: Medium
The process for Services to update / submit their
Project Registers as at end March each year has
been incorporated into the Chief Officers annual
assurance certificate and checklist process.  The
deadline for 2022/23 returns was May 2023 and
as of July 2023, some Chief Officers have still to
provide their updated Project Register.
Notwithstanding this, an updated corporate
Project Register has been produced and shared
in the Teams site with all Programme of Work
groups.  The purpose of this Register is twofold -
to assist with work currently underway to develop
the high-level Delivery Plans for each
Programme of Work, and to inform the Quality
Assurance process which is currently under
development to ensure that projects are being
managed, delivered, and evaluated in line with
good practice / good governance and the Project
Management Framework.
This process will start off with an online survey
which will be issued to Project Managers / SROs
in Cycle 3 of 2023. The updated Project
Registers, referenced above, are required to
ensure the right people/projects are surveyed.
Original timescale:
June 2020 
Revised timescale: 
September 2022 
Further revised
timescale:
March 2024
Whilst we acknowledge that significant action has
been taken with regards the project risk register and
this is now in place, the Quality Assurance process
to monitor compliance with the refreshed Project
Management Framework still requires to be further
developed and implemented.  As such, we have
assessed the residual risk as ‘High’ and consider it
important that thew revised timescale is adhered to. 
We would suggest that the Panel may wish to
consider requesting an update on this issue from
relevant senior management at a future meeting of
the Panel. 
Page 119 of 240

Page 124

Appendix 1 (continued) Internal Audit recommendations - Management actions assessed as ‘not yet complete’ 
Chief Officer
Report Details Details from original recommendation Current position per management
update
Original and
revised
timescales
Internal Audit comment
Chief Officer (Business and Digital)
Cyber Security
(January 2023)
Risk: A lack of appropriate and detailed
guidance (and/or understanding of such
guidance) may result in the inability of
Services to fully consider the impact of a
loss of IT at a service level and the steps
necessary to respond to minimise
disruption to the Council and/or service
areas.
The absence of up-to-date, comprehensive
ICT Disaster Recovery Plans could result
in the inability to restore corporate or
service infrastructure in line with
expectations.
Recommendation: Business and digital
management should:
(1) ensure the ICT Disaster Recovery
Plan refresh progresses in line with
expected timescales to ensure that
fully documented plans are in place; 
(2) communicate with system owners to
ensure that Services are clear on their
responsibilities and planned recovery
times in relation ICT disaster recovery
and the need for this to be aligned with
their Service business continuity plans;
and
(3) ensure appropriate oversight/review of
Services/System Owners ICT disaster
recovery arrangements/plans to
ensure these are consistent with and
fully meet the requirements of the
Council’s disaster recovery standard. 
Category: Medium
A fully documented process has been developed
to provide explicit direction on ICT disaster
recovery planning within NLC.  This highlights
responsibilities for disaster recovery and includes
links to templates/testing records etc which all
services (as product owners) within the Council
are required to use.  This is supported by a new
Major ICT Incident Plan, for managing what
would be seen as once in a generation types of
ICT incident, such as that which happened to
SEPA.
In the period January – March 2023, product
owners were advised of the new model for ICT
disaster recovery planning, and the requirement
to update and refresh any existing plans and
ensure they would be stored as per requirements
documented in the ‘ICT Disaster Recovery –
Operational Procedure’ publication. The new ICT
disaster recovery processes have been further
outlined through the Data Management Team,
supported by the spinning up of a Communities of
Practice ‘team channel’ established to facilitate
ongoing discussion and collaboration.
The Data Governance Board and individual
SMTs will now take responsibility for the oversight
of disaster recovery plans.  Meetings between
Information Risk & Security and owners of ‘Gold’
and ‘Silver’ products are being scheduled to
ensure disaster recovery planning processes
continue to be operated and identify any non-
compliant and/or high-risk areas as appropriate. 
Following the initial tranche of meetings at the
start of 2023, the Information Risk & Security
Team is co-ordinating follow-ups with product
owners to ensure requested actions (including
disaster recovery plan updates) have been
undertaken.
Original timescale:
June 2023 
Revised
timescale:
December 2023
We acknowledge that there has been considerable
action taken in this area which demonstrates a
positive direction of travel and have thus assessed
the residual risk as ‘Low’. 
We recognise that while the Service have
completed all planned deliverables and established
processes to ensure ongoing oversight of the
Services ICT disaster recovery arrangements,
however we consider that the identified follow-up by
the Information Risk and Security Team needs to
be completed and actions arising identified to
ensure the Services/System Owners ICT disaster
recovery arrangements fully meet the requirements
of the Council’s disaster recovery standard.
Accordingly, we would suggest that the Panel may
simply wish to consider agreeing to note the
progress made and the revised completion date.
Page 120 of 240

Page 125

Appendix 1 (continued) Internal Audit recommendations - Management actions assessed as ‘not yet complete’ 
Chief Officer
Report Details Details from original recommendation Current position per
management update
Original and
revised
timescales
Internal Audit comment
Chief Officer (Education)
Education: Quality
Assurance
Arrangements
(January 2023) 
Risk: The service may fail to adequately review
school performance and/or improvement progress
in a timely and ongoing manner, resulting in a
failure to identify and then progress appropriate
actions to secure improvement.
Recommendation: Education and Families should
ensure that:
(1) the refreshed quality assurance framework is
fully implemented in a timely manner across all
primary and secondary schools;
(2) regular monitoring is undertaken to ensure that
all planned quality assurance activities are
undertaken in a timely manner consistent with
an updated quality improvement framework
calendar; and
(3) a formal review of the adequacy and
effectiveness of recently revised/updated
processes (particularly VSE and SIDS) is
undertaken, after a sufficient period, to assess
how well they are operating, identifying and
taking any necessary adjustments and/or
improvement actions as appropriate.
Category: High
The refreshed quality assurance
framework has been implemented for
session 2022-23 and the Service are
currently reviewing the impact of the
new reporting processes and
identifying any further training
requirements (e.g. improving
evaluative writing).
The Quality Improvement Framework
Calendar for 2022-23 was distributed
and used to outline and monitor key
planning and reporting activity.
The implementation of a planned
programme of VSEs was undertaken
in session 2022-23 and a suite of
supporting materials created to ensure
a consistency of approach across the
Service.  A formal review is currently
underway to evaluate the impact of
new processes prior to implementation
in session 2023-24.  Key findings from
VSEs will be collated to inform future
planning and service improvement
priorities as applicable.  The inclusion
of additional cluster data/information
will be used in session 2023-24 as part
of improvement discussions.
Original timescale:
June 2023 
Revised timescale: 
September 2023
We acknowledge that there has been considerable
action taken to date and that there is a need for the
Service to obtain and review data from a whole school
session to enable them to fully evaluate the impact of
the new approach.
We consider the revised timescale to be reasonable
and have assessed the residual risk for this
recommendation as ‘Low’.
Accordingly, we would suggest that the Panel may
simply wish to consider agreeing to note the progress
made and the revised completion date.  
Page 121 of 240

Page 126

Appendix 1 (continued) Internal Audit recommendations - Management actions assessed as ‘not yet complete’ 
Chief Officer
Report Details Details from original recommendation Current position per
management update
Original and
revised
timescales
Internal Audit comment
Chief Officer (Education)
Education: Quality
Assurance
Arrangements
(January 2023) 
Risk: The Service may find it difficult to
demonstrate or evidence that appropriate and
timely support and challenge has been provided to
schools in the preparation and finalisation of their
School Improvement Plans (SIPs) and School
Improvement Reports (SIRs).
Recommendation: Education and Families
should:
(1) remind all Head Teachers and Education and
Families Managers of the importance of
ensuring that SIPs and SIRs are prepared in
accordance with expected timelines and
ensure that any overdue SIPs or SIRs are
pursued as a matter of urgency; and
(2) remind Education and Families Managers of
the need to populate their review spreadsheets
for SIRs and SIPs to fully evidence their
oversight/scrutiny activity including recording
key details such as dates of receipt and review,
key qualitative comments and issues arising,
and key feedback provided to Head Teachers
to address.
Category: Medium
All relevant staff (Headteachers and
Education and Families Managers etc)
were reminded of, and understand,
their roles, responsibilities and of the
key submission dates. 
In addition, Lead Officers regularly
remind officers of key submission
dates and the importance of ensuring
timeous submission of key
documentation. 
For session 2022-23, a Glow form was
introduced to support monitoring and
collection of key data from annual
improvement reports.  This allows
officers to quickly identify and respond
to any non or late submissions of
improvement reports.  It allows
facilitates a consistent approach to
scrutiny of plans and submissions.
Further work will now be undertaken to
develop a more consistent approach to
monitoring mid-year progress
submissions.
Original timescale:
May 2023 
Revised timescale: 
June 2024
While the recommendations have been addressed in
full, the Service has recognised the need to review a
full year’s School Improvement Documentation to
inform improvement discussions and to further
develop a more consistent approach to monitoring
mid-year progress submissions.
We consider the revised timescale to be reasonable
and have assessed the residual risk for this
recommendation as ‘Low’.
Accordingly, we would suggest that the Panel may
simply wish to consider agreeing to note the progress
made and the revised completion date.  
Page 122 of 240

Page 127

Appendix 1 (continued) Internal Audit recommendations - Management actions assessed as ‘not yet complete’ 
Chief Officer
Report Details Details from original recommendation Current position per
management update
Original and
revised
timescales
Internal Audit comment
Chief Officer (Education)
Income and Cash
Collection –
Leisure Sites
(January 2023) 
Risk: Procedures may be inadequate resulting in
processes being undertaken unnecessarily.
Procedures and/or arrangements may not be
operating as expected and/or may not be being
applied consistently across all leisure sites with an
increased risk that income collected may not be
fully recorded and/or properly accounted for.
Recommendation: Service management should
ensure that a comprehensive review of all aspects
of the control framework for income/cash-handling
at leisure sites is undertaken with a view to
ensuring that up-to-date written procedures clearly
setting out expected controls and actions are
prepared and then implemented.
These should reflect the current operating
environment and include consideration of each of
the issues identified above.  Once finalised, revised
guidance should be circulated to all staff and
training delivered as appropriate.
Category: High
A review of appropriate procedures
has been undertaken and new written
procedures have been circulated to
staff.  
Training has been provided on a one-
to-one basis as needed and will
continue to be delivered on-site as
required.  
Learn NL modules for annual
certification are currently at the design
stage and are scheduled to be
completed later in the year.
Original timescale:
April 2023 
Revised timescale: 
October 2023
We acknowledge that significant action has been taken
to address the recommendations with a review having
been undertaken and refreshed procedures written and
issued.  However, there is no evidence/confirmation
obtained that the procedures have been read and
understood by the managers and thereafter
communicated to the staff within their venues who are
involved in the handling and processing of Active NL
income.  Furthermore, there have been no compliance
checks undertaken to ensure that the procedures,
including accurate and full completion of the relevant
documentation, are being complied with.  The Service
have confirmed that they are considering the next
steps required to address these issues.
We consider the revised timescale to be reasonable
and have assessed the residual risk for this
recommendation as ‘Low’.
Accordingly, we would suggest that the Panel may
simply wish to consider agreeing to note the progress
made and the revised completion date. 
Page 123 of 240

Page 128

Appendix 1 (continued) Internal Audit recommendations - Management actions assessed as ‘not yet complete’ 
Chief Officer
Report Details Details from original recommendation Current position per
management update
Original and
revised
timescales
Internal Audit comment
Chief Officer (Finance)
Sundry Debtors/
Debt Management
(October 2022)
Risk: Policies and procedures may be inadequate,
resulting in processes which do not effectively contribute
toward maximising income.
Debt management arrangements may not be operating
efficiently and effectively and may not be applied
consistently across the Council, resulting in delays
receiving payments, loss of income or inequitable
treatment of debtors.
Recommendation: Head of Financial Solutions should
ensure that a formal review of the debt management
framework is undertaken to revisit and refresh all aspects,
including policy, procedures and operational
arrangements with a view to improving the efficiency,
timeliness, effectiveness and equity of the Council’s
current approach to debt management.
This review should include consideration of the purpose
and objectives of debt management activity and cover
areas such as:
• Establishing which activities are best done at a
corporate-level and within Services;
• Ensuring between corporate and Service roles and
responsibilities are clear and documented;
• Examining whether Services are minimising the need
for raising invoices by ensuring wherever possible that
payment for good and services is obtained in advance
of service provision;
• Producing clear guidance detailing key requirements
for all aspects of the debt management process (e.g.
holding appropriate documentation to support debts
raised and expectations for monitoring outstanding
debt and recording debt recovery action taken); and
• Identification of the most effective methods for
monitoring compliance and performance of debt
management activities.
Category: High
A focus group consisting of key staff
from across the services was
established to gain a deeper
understanding of current processes
and where improvements could be
made.  
In addition, a new procedure manual
for debt recovery is being prepared
and “how-to” guides are being
developed for Ash Reporting, which
will enable users to self-serve and
access the debt reports on the system
as and when required, instead of
reports being produced and issued
quarterly by the Sundry Debt Team.    
The Corporate Debt Policy is also
undergoing a review. 
The Chief Officer (Finance) reported
an update to BMT on 6/7/2023
outlining next stages which includes
engagement at a more senior
managerial level to agree and
implement improvement actions and
recommendations.  The intention is
that Chief Officers nominate a
'responsible person' for debt recovery
within their service. The Service plan
to introduce a standard Senior
Management Team quarterly reporting
regime in relation to debt recovery, to
improve consistency in monitoring and
reporting, and ensure there is greater
accountability.  The format and content
of such reports remains under
consideration. 
Original timescale:
April 2023 
Revised timescale:
September 2023 
We acknowledge that significant action has
now been taken to review and refresh the debt
management framework, including
establishing a focus group, identifying and
undertaking some ‘quick wins’, defining
accountability between service and corporate
roles and reviewing and updating the
procedures. Furthermore, we note that the next
stages in the process have been agreed for
taking forward.  We have therefore assessed
the residual risk as ‘Medium’ and consider it
appropriate that the outstanding actions are
progressed and fully implemented in line with
the revised timescales.  
In response to a request made by the Panel, a
separate report is included on the agenda from
the Service regarding this recommendation,
progress made and proposed actions. 
Page 124 of 240

Page 129

Appendix 1 (continued) Internal Audit recommendations - Management actions assessed as ‘not yet complete’ 
Chief Officer
Report Details Details from original recommendation Current position per
management update
Original and
revised
timescales
Internal Audit comment
Chief Officer (Legal and Democratic)
Corporate
Governance –
Principles C & D 
(May 2023)
Risk: Without regular review, key corporate
policies may not be appropriate or accurately reflect
the Council’s arrangements and/or staff and other
key stakeholders may not be aware of the most up-
to-date policies and procedures.
Recommendation: The Chief Officer (Legal and
Democratic) should ensure that the Scheme of
Delegation to Officers is reviewed and updated in
line with the revised timescales (June 2023).
Category: Medium
A review of the Scheme of Delegation
for Officers has been concluded
following input from a number of Chief
Officers.  
The revised Scheme will be submitted
to CMT on 18th August for approval,
prior to submission to the full Council
meeting on 5th October.
Original timescale:
June 2023 
Revised timescale:
October 2023
The Scheme of Delegation for Officers has been
concluded and will be submitted to both CMT and the
full Council meeting after the Summer recess.  As
such we have assessed the residual risk as ‘Low’.
Accordingly, we suggest that the Panel may simply
wish to consider agreeing to note the progress made
and the revised completion date.
Chief Officer (People Resources)
Corporate
Governance -
Principles A & B
(February 2022)
Risk: Without effective workforce planning, there is
a risk the Council may not have in place (or
identified the actions it needs to progress to ensure
it has in place) the staff and skills it needs to enable
it to deliver services and achieve planned
outcomes.
Recommendation: The Head of People and
Organisational Development should ensure that
the service workforce plans are completed and
reported in accordance with the revised timescales
to inform future workforce planning activity.
Category: Medium
Chief Officers have completed service
workforce plans.  The key highlights
from these plans will be included in the
One Workforce report due to go to
Policy and Strategy Committee in
September 2023.
Original timescale:
June 2022 
Revised timescale:
June 2023 
Further revised
timescale:
September 2023
The workforce plans have been completed by Chief
Officers and will be included in the One Workforce
report scheduled to be submitted to the Policy and
Strategy Committee in September 2023.  As such we
have assessed the residual risk as ‘Low’.
Accordingly, we suggest that the Panel may simply
wish to consider agreeing to note the progress made
and the revised completion date. 
Page 125 of 240

Page 130

Appendix 1 (continued) Internal Audit recommendations - Management actions assessed as ‘not yet complete’ 
Chief Officer
Report Details Details from original recommendation Current position per management
update
Original and
revised
timescales
Internal Audit comment
Chief Officer (People Resources)
Equalities
(November 2022)
Risk: Without an effective performance
management framework, management would not
be able to measure whether the Equality Outcomes
and the actions taken to address these were having
the expected impact, and/or may not be able to take
appropriate action to address areas of ‘under-
performance’.
Without formal processes, reports may not be
published in accordance with the agreed committee
and/or statutory timescales.
Recommendation: The Head of People and
Organisational Development should ensure that:
(1) a robust performance monitoring framework is
developed that will allow management to
measure performance and impacts more
effectively and accurately against the equality
outcomes and allow for periodic assessments
to be undertaken.  This should include
identifying clear and realistic targets for each
outcome and consideration of current and
future planned actions which are designed to
contribute to the achievement of these
outcomes;
(2) ensure that robust arrangements are in place
to enable accurate and up to date information
to be collated and reported to key stakeholders
in accordance with the committee and statutory
timescales; and
(3) seek to ensure greater transparency underpins
the process for identifying/setting/prioritising
Equalities outcomes/targets and associated
activities and actions.
Category: Medium
A new Equalities Board has been established to
oversee the work to mainstream equalities across
the Council as well as the progress in relation to
the Council's 9 equality outcomes.  The Board
members are currently working with the
Equalities Team to develop SMART action plans
for each of their services and within these plans
the equality outcomes will also sit - adjacent to the
service where they belong to ensure the
outcomes are not only SMART but
mainstreamed.   Services have been asked to
have the action plans ready by September 2023
as agreed with Internal Audit.
The Equality Outcomes Progress Report,
required by the Public Sector Equality Duties to
be published every 2 years was approved by the
Wellbeing and Tackling Poverty Committee on 5
May 2023 and has been published on the Council
website.
Equality outcomes are to be reviewed and set
every four years taking reasonable steps to
involve and consider relevant evidence.  The next
set of outcomes will be set by 30 April 2025.  The
Equality Board will ensure the necessary steps
are in place to develop a process which aligns
with the recommendations of the audit.  The
Panel should also be aware that the Scottish
Government is expected to imminently publish its
findings of the review of the Scottish Specific
Duties which includes the duty to publish equality
outcomes and report on progress.  Any changes
to the duties will need to be taken into
consideration when the Service review and set
the Council's outcomes in 2025.
Original timescale:
April 2023  
Revised timescale: 
March 2024:
We acknowledge that significant action
has now been taken to address this action
and that delays in implementation of the
actions in line with the previously agreed
timescale are largely due to the
timescales around completion of the
action plans in line with the performance
framework and the timing of the next
review of equality outcomes.  We have
therefore assessed the residual risk as
‘Medium’ and consider it appropriate that
the outstanding actions are progressed
and fully implemented in line with the
revised timescales.  
In response to the Panel’s request
following consideration of an update on
progress against recommendations made
in the Equalities audit report, a separate
report is included on the agenda from the
Service regarding this recommendation,
progress made and proposed actions. 
Page 126 of 240

Page 131

Appendix 1 (continued) Internal Audit recommendations - Management actions assessed as ‘not yet complete’ 
Chief Officer
Report Details
Details from original
recommendation
Current position per management
update
Original and
revised
timescales
Internal Audit comment
Chief Officer (People Resources)
Supporting
Attendance 
(August 2022)
Risk: Without formal documented
processes outlining how performance
information should be prepared, staff may
not be aware of how to calculate the
performance measures which may result in
inaccurate performance data being
reported by stakeholders.
Recommendation: People and
Organisational Development should ensure
that the processes for preparing/calculating
sickness absence performance information
for LGBF, SMT and JCC are formally
documented, with pro-forma definition
sheets clearly setting out the definition of
the performance measure and the
methodology for its calculation in
accordance with the Council’s performance
management arrangements.
Category: Medium
Informal processes have been agreed with
key stakeholders and are in operation, but
formal documentation of this process has not
been completed.
A technical library for all reporting has been
created for Workforce Analytics Team and
this provides a breakdown of each report and
the calculations required for each element of
the report.  Reports have been reviewed as
per LGBF guidance, which sets out
calculation of Sickness days lost for Teaching
& Non-Teaching groups.  
Work is currently underway to ensure that the
definition of teaching staff laid out in Section
6a of LGBF guidance is accurately reflected
in reporting.
Data for each month is reviewed and
compared to previous month and previous
year to ensure consistency of information.  All
information extracted from iTrent is reviewed
by Workforce Analyst and thereafter passed
to Employee Relations Employment & Policy
Officer for final confirmation.
An ongoing review of all absence reporting
from iTrent is being undertaken with
Employee Relations Team to ensure all
absence reporting is accurate and fit for
purpose.  
Work is underway to build Absence
Dashboards which will be built from the
ground up, with calculations based on LGBF
guidance and compared to existing reports to
ensure accuracy and consistency.
Original timescale:
April 2023 
Revised timescale:
December 2023
We acknowledge that there has been significant action
taken to address the recommendation made and that
further actions required to fully implement this
recommendation have been identified and are being
progressed. We have assessed the residual risk as
‘Medium’ and consider it important that the agreed
extension date of December 2023 is achieved.
Accordingly, we would suggest that the Panel may
wish to consider agreeing to note the progress made
and the revised timescale for completion and to
monitor progress made as part of the next follow-up
report.
Page 127 of 240

Page 132

Appendix 1 (continued) Internal Audit recommendations - Management actions assessed as ‘not yet complete’ 
Chief Officer
Report Details Details from original recommendation Current position per
management update
Original and
revised
timescales
Internal Audit comment
Chief Officer (People Resources)
Payroll – Selected
Key Controls
(June 2021)
Risk: Overtime is currently being paid which has
been authorised but is not being authorised (and
paid) in accordance with employees’ agreed terms
and conditions.
Recommendation: The Head of People and
Organisational Development should undertake a
review to determine whether Section 7.2 of
Schedule A remains appropriate and take steps to
amend or remove it from the Council’s terms and
conditions.
Category: Medium
A report was presented to the Joint
Consultative Committee in June 2023
advising on the proposal changes to
the approval process for overtime as
outlined with the Council’s Core
Conditions of Service.
It was proposed to change the detail
within the Core Conditions of Service
to be more reflective of the current
practices and structure within the
Council.  This would mean the removal
of any authorisation requirements from
an Executive Director, moving to the
Line Manager and Service Manager as
appropriate and allowing employees to
earn beyond the earnings ceiling of
SCP35 if their substantive salary is
below SPC35.  Those with a salary at
SCP35 or above, will be able to work
overtime as appropriate but will
receive this overtime based on
SCP35.
The Trade Unions have requested
time to consider the proposals before
they are presented to the BMT and
implemented.  Arrangements will be
made to amend the Core Conditions of
Service with a revised version
thereafter being made available to
employees through MyNL.
Original timescale:
December 2021 
Revised timescale:
April 2023 
Further revised
timescale:  
September 2023
We acknowledge that there has been significant
progress made in addressing the recommendation
and recognise that the delay in full implementation is
as a result of consultation with the Trade Unions.  We
have therefore assessed the residual risk as ‘Low’
and consider it important that the revised timescale for
implementation is adhered to.
Accordingly, we suggest that the Panel may simply
wish to consider agreeing to note the progress made
and the revised completion date. 
Page 128 of 240

Page 133

Appendix 1 (continued) Internal Audit recommendations - Management actions assessed as ‘not yet complete’ 
Chief Officer
Report Details Details from original recommendation Current position per
management update
Original and
revised
timescales
Internal Audit comment
Chief Officer (Place)
Creditors
(January 2023)
Risk: Expenditure may not be properly incurred.
Increased potential risk of fraud and/or error and that any
relevant issues would not be identified in a timely
manner.
Recommendation:  The Chief Officer (Place) should
ensure that completion of the interface between PECOS
and eFinancials via the Purchase to Pay (P2P) project is
progressed in line with proposed timescales. Once
complete, appropriate guidance on its use and any
associated expectations should be prepared and
communicated to Services. 
Category: Medium
There has been good progress made
to resolve the technical issues that
were previously preventing there being
a successful interface between
PECOS and eFinancials to enable an
automated process for matching and
paying invoices. 
Final User Acceptance Testing will be
undertaken with users from different
services during July and August. 
Thereafter, there is a planned roll out
of communication and training in
September 2023 prior to the interface
going live in October 2023. 
Original timescale:
June 2023 
Revised
timescale: 
October 2023 
We acknowledge that there has been significant
progress made in addressing the recommendation
and are pleased to note that the Service have
given a firm commitment for the full implementation
of the recommendation.  We have therefore
assessed the residual risk as ‘Low’ and consider
it important that the revised timescale for
implementation is adhered to.
Accordingly, we suggest that the Panel may simply
wish to consider agreeing to note the progress
made and the revised completion date. 
Appendix 2  Residual risk rating definition
Internal Audit assessment of residual risk from non-implementation 
High Non-implementation of actions has the potential to significantly undermine the relevant control environment.
Medium Non-implementation of actions has the potential to impact upon the achievement of the control environment.
Low Other issues which require management attention but which pose less significant or less immediate impacts to the control environment. 
Page 129 of 240

Page 134

Page 130 of 240

Page 135

North Lanarkshire Council
Report
Audit and Scrutiny Panel 
Does this report require to be approved? ☐ Yes   ☒ No
☐approval ☒noting Ref KA/ASP/Sept23 Date 04/09/23 
Accounts Commission – Local government in Scotland overview
report (May 2023) 
From:  Ken Adamson, Chief Officer (Audit and Risk)
E-mail: adamsonk@northlan.gov.uk Telephone 07939 280602 
Executive Summary
The purpose of this report is to present to the Panel the contents of the Accounts Commission
report ‘Local Government in Scotland overview 2023’ which was published in May 2023. Full
copies of the report can be found at Local government in Scotland: Overview 2023 (audit-
scotland.gov.uk).
The report examines how the pandemic has affected Council’s performance, reviews current
and future challenges facing local government and considers how well-placed councils are to
deal with these challenges.  The findings of the report are drawn from 2021-22 annual audits,
performance and best value work carried out during 2022 and from specific research and
analysis of available data and intelligence.
The key message from the Accounts Commission is that councils have never faced such a
challenging situation, with demand and workforce pressures deepening after the Covid-19
pandemic and funding forecast to reduce in real terms.  The Accounts Commission comment
that radical change, achieved through greater collaboration, is urgently needed if council are
to maintain services and address community needs and inequalities.  The report makes a
series of recommendations for councils, the Scottish Government and COSLA.
Finally, the report provides a high-level overview of how the Council has, and is, responding
to the issues identified by the Accounts Commission.
Recommendations
The Panel is invited to:
(a) note the findings, conclusions and recommendations contained within the Accounts
Commission report;
(b) consider whether there are any issues raised by the Accounts Commission report which
the Panel consider are sufficiently significant to require a further report from
management to be submitted to a future meeting of the Panel;
(c) otherwise note this report.
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Item 8
Page 131 of 240

Page 136

1. Background
1.1 The Accounts Commission is the public spending watchdog for local government in
Scotland.  As part of its role, the Commission publishes annually an overview report
on local government which brings together its wider work across the sector.
1.2 The overview report published in May 2023, is the third and final overview report in a
series of reports assessing the impact of the Covid-19 pandemic on the sector.  The
report builds on the previous two reports and examines how the pandemic has
affected councils’ performance, reviews current and future challenges facing local
government and considers how well-placed councils are to deal with these
challenges.
1.3 Members should note that the Accounts Commission report was published before the
signing by representatives from COSLA and the Scottish Government in late-June of
the Partnership Agreement, known as ‘The Verity House Agreement, which set out a
shared vision for a more collaborative approach to delivering shared priorities for the
people of Scotland. 
2. Report
Key findings
2.1 The Accounts Commission key findings and conclusions are as follows:
• On councils’ performance: Service performance was beginning to stall before the
pandemic as a result of long-term reductions in funding and wider pressures.  The
pandemic has affected performance across all service areas.  Some services are
showing signs of recovery, but there are also signs of growing backlogs, declining
performance in some areas and services at capacity.  The extent and impact of
needs not being met is not clear.
• On finance and resources:  Budget constraints and increasing cost pressures are
putting councils’ finances under severe strain.  An increasing proportion of funding
is ringfenced or directed for national policy initiatives.  While this is important to
help deliver national priorities, it prevents councils from making decisions about
how funds can be used at a local level, to meet local need.  Councils have had to
make significant savings to balance their budgets.  Increasingly difficult choices
about spending priorities and service provision are having to be made.
• On addressing community needs and inequalities:  The pandemic has affected
performance across all service areas.  There are signs of growing backlogs and
declining performance in some service areas.  Councils have a clear focus on
tackling inequalities but the extent and impact of needs not being met is unclear. 
Some communities are facing crisis, with persistently high levels of poverty and
increasing financial hardship putting additional pressure on services, at a time
when councils have less capacity to support them.
• On collaboration: The scale of the challenges ahead means that radical change is
needed.  It is only by working more collaboratively that councils and their local
partners, communities and the third sector will be able to provide sustainable local
services and deliver a significant programme of national reform to tackle issues
such as climate change, child poverty and inequalities.  The pandemic
demonstrated the benefits of partnership working and shared local goals.  This
needs to continue.  Few councils provide services jointly or share professional
support services.  Many councils engage well with communities and local partners
to better understand local priorities and needs.  Now councils must better involve
service users and communities, including those with lived experience, as they
redesign services  
Page 132 of 240

Page 137

2.2 The Commission also highlight at some length the challenges facing councils with
councils are operating in an increasingly volatile and uncertain landscape, as
pressures increase after Covid-19 and funding forecast to be reduced in real terms. 
Some communities are facing crisis, with increasing poverty and financial hardship
putting additional pressure on services at a time when councils have less capacity to
support them.  The Commission highlight that:
• Budget constraints and increasing cost pressures are putting councils’ finances
under severe strain with increasing cost pressures jeopardising the sustainability
of local services, councils relying on reserves to bridge budget gaps and
increasingly ring-fenced and directed budgets reducing councils’ financial
flexibility;
• Changing demographics, the pandemic and the cost-of-living crisis increase
pressure on council services and people already experiencing inequality are most
affected;
• Councils are managing an increasing programme of national reform, including
plans for a national care service, which comes with substantial funding implications
and increased uncertainty;
• Increasing workforce challenges such as recruitment difficulties and high sickness
absence levels are putting councils under continued pressure; and 
• While many councils demonstrated strong collaborative leadership during the
pandemic, ineffective leadership and high levels of change in senior officers
identified at several councils present a risk.
2.3 The report also assess how councils are responding to these challenges and comment
that councils must focus on solutions that will deliver a sustainable future for local
government.  In particular, the report highlights that councils need to challenge old
ways of doing things and take urgent action to reform.  The Commission highlight that:
• Councils need to balance immediate financial pressures with planning for and
delivering long-term sustainable services;
• Leaders need to invest time and capacity into thinking radically about their
councils’ future operating model, how it will be achieved and be open with
communities and staff;
• Councils need to collaborate with communities, other councils and the wider public
sector to tackle the challenges;
• Workforce planning must improve so that councils have the staff, skills and leaders
needed to bring about change and create a resilient workforce for the future; and
• Councils have a clear focus on tackling inequalities and strengthening the use of
data will help them to better understand community needs and focus fundamental
change on improving long-term outcomes.
How is the Council placed in relation to the Accounts Commission findings?
2.4 Senior management of the Council accepts and shares much of the Accounts
Commission’s analysis of the significant challenges facing councils and would argue
that many of the issues identified are already recognised in the Council’s strategic and
operational planning processes and plans.  Indeed, the Council undertakes
environmental scanning, including considering external reports by relevant external
bodies including the Accounts Commission, to ensure that plans and policies are
properly informed and reflective of the key issues and challenges facing the Council.  
Page 133 of 240

Page 138

2.5 The well-established Plan for North Lanarkshire (TPFNL) sets out clearly the Council
and key partners’ ambitions and priorities.  The TPFNL, the recently refreshed
associated Programme of Work to 2028 and the recently approved Medium Term
Financial Plan 2024/25 to 2028/29, all reflect the challenges and constraints within
which the Council must operate, but also continue to reflect the Council’s ambitious
agenda and desire to maximise positive outcomes for the people and communities of
North Lanarkshire.
2.6 Partly in response to the challenges and pressures facing local government, the
Council’s senior management arrangements have recently been refreshed with
revised governance arrangements designed to provide appropriate consideration of
assurance, risk and performance management arrangements whilst also providing a
clear focus on the delivery of key activities forming part of the Plan for North
Lanarkshire.
2.7 The Plan for North Lanarkshire and the associated Strategic Performance Framework
includes the use of a wide range of performance indicators, many of which continue
to show positive trends since 2018-19, particularly around improved economic activity,
wage levels and inward investment.
2.8 The Council is also committed to a range of actions designed to address poverty and
inequalities including continuing to improve education outcomes, addressing
educational inequalities and improving the areas skills base.  While significant ongoing
workstreams, underpinned by significant capital investment facilitated by the
Community Investment Fund, are also allowing the Council to address some of the
challenges facing our local town centres, to ensure our asset base is modern, efficient
and fit for purpose and to address the need to expand and modernise our local housing
stock.
2.9 Although it has a successful track record in sound financial planning, including three-
year budgeting, and delivering required budget savings, it is recognised that the
increasingly challenging financial situation facing the Council makes doing so in a way
which maintains core services and ensures service provision and future plans are
financially sustainable is becoming increasingly difficult year-on-year and will require
increasingly difficult decisions and choices about spending priorities.
2.10 As part of its response to these challenges the Council continues to seek to ensure
that its structure, service delivery models and operational processes remain fit for
purpose and maximise efficiency and effectiveness.  This is underpinned by robust
corporate governance arrangements including a range of self-evaluation and/or review
mechanisms outlined in the Strategic Governance Framework.
2.11 Detailed information in respect of the revised Programme of Work will be reported to
Policy and Strategy Committee in late-September, whilst performance information is
reported regularly to elected members via Service Committees, Policy and Strategy
Committee and the Audit and Scrutiny Panel in line with frequencies/timetables
outlined in the Strategic Performance Framework.  
3. Measures of success
3.1 The Council is able to continue to deliver on its strategic ambitions and deliver
positive outcomes consistent with the Strategic Performance Framework against the
challenging backdrop set out in the Accounts Commission report. 
4. Supporting documentation
Appendix 1 Accounts Commission recommendations 
Ken Adamson, Chief Officer (Audit and Risk) 
Page 134 of 240

Page 139

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact because of the Public Sector Equality
Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data?  
Yes ☐ No ☒
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
5.8 Communications impact
Does the report contain any information that has an impact on the council’s communications
activities?
Yes ☐ No ☒
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If yes, please provide a summary of the key risks and potential impacts, highlighting where
the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk Registers),
and how they are managed?
Effective responses by management to the weaknesses, control issues and/or areas of improvement
identified by Internal Audit will increase the likelihood of the Council achieving its ambitions by
improving control frameworks and more effectively mitigating potential risks and threats to the
achievement of planned outcomes.
5.10 Armed Forces Covenant Duty
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does it
relate to healthcare, housing, or education services for in-Service or ex-Service personnel, or
their families, or widow(er)s)?
Yes    ☐                No ☒
5.11      Childrens rights and wellbeing impact
Does the report contain any information regarding any council activity, service delivery, policy,
or plan that has an impact on children and young people up to the age of 18, or on a specific
group of these?
Yes ☐         No ☒ 
Page 135 of 240

Page 140

Appendix 1
Accounts Commission Local Government Overview Report 2023 – recommendations
On finance and resources
1. The Scottish Government and COSLA need to take urgent action to finalise the New
Deal for local government (paragraphs 71–73) and agree: 
• a new partnership agreement with councils that supports collaboration 
• a fiscal framework for local government that supports sustainable funding and greater
financial flexibility and transparency
2. The Scottish Government needs to provide more detailed financial information (e.g.,
breakdown of type of funding and individual council allocations) to support councils
longer-term financial planning.
3. Councils need to set out medium- to long-term financial plans that detail:
• how they will make recurring savings and reduce reliance on reserves to fill budget
gaps
• how council resources are targeted to achieve their long-term policy and
performance priorities.
On community needs and inequalities
4. Councils should be more transparent with the public about scale of service demand, the
extent of backlogs and changes to eligibility criteria necessary to ration access to
services and any impact this has on unmet need.
5. Councils should have a clear plan for strengthening their use of data to understand
needs, make decisions and direct resources.  This includes equalities data, and learning
from those with lived experience.
On collaboration
6. Councils need to maximise the potential of collaboration by demonstrating they are:
• working with other councils, the wider public sector and the third sector to redesign
and provide services
• involving service users and local communities in the redesign of services 
Page 136 of 240

Page 141

North Lanarkshire Council
Report
Audit and Scrutiny Panel 
Does this report require to be approved? ☐ Yes   ☒ No
Ref: ASP/Aug23/KA Date 04/09/23 
National Fraud Initiative – Update 
From  Chief Officer (Audit and Risk)
E-mail adamsonk@northlan.gov.uk Telephone 07939 280602 
Executive Summary
The purpose of this report is to inform the Panel of the progress made to date by the Council
in response to the 2022 National Fraud Initiative (NFI) data matching exercise and to
highlight where further action is required by the Council and/or relevant Services.
The NFI is a data matching exercise, organised by Audit Scotland, which is undertaken
every two years and is recognised as an important tool in  preventing and detecting fraud. 
It involves comparing data sets from across a wide range of public bodies using criteria
which allows for the identification of inconsistencies and anomalies which may be indicative
of possible fraud and/or error.  This information then enables public bodies to follow-up
matches on a targeted and prioritised basis to establish if fraud has occurred and to take
appropriate action.
Recommendations
It is recommended that the Panel note the contents of this report, progress made to date
and future planned action in relation to the follow-up of matches.
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Item 9
Page 137 of 240

Page 142

1. Background
1.1 The NFI is a UK-wide exercise which enables public bodies to take advantage of data
matching techniques to assist them in detecting possible fraud and error.  It is organised
by Audit Scotland and is carried out by them under statutory powers added to the
Finance and Accountability (Scotland) Act 2000 by section 97 of the Criminal Justice
and Licensing (Scotland) Act 2010.
1.2 The NFI works by using data matching to compare a range of information held by public
bodies to identify potential inconsistencies or circumstances that could indicate fraud
or error.  This information enables public bodies to follow-up these matches on a
targeted and prioritised basis to establish if fraud has occurred and to take appropriate
action.  A match does not automatically mean that there is fraud or error, and therefore
the Council is not expected to review and/or follow up every match.  The outcomes from
any investigations are recorded on the secure NFI web application.
1.3 Information in relation to payroll, housing (current tenants and waiting lists), council tax
reduction scheme, blue badge parking permits, taxi licenses, and creditor payments
and other relevant standing data was uploaded by the Council to the secure NFI
database in October 2022.  The results of the data matching for these datasets were
received on 27 January 2023 and the Council has a total of 11,361 matches across 86
separate reports.
1.4 Additionally, council tax single person discount and electoral register data was
uploaded separately to the NFI database in December 2022.  As the matches only
relate to North Lanarkshire, they were made available shortly after submission and the
Council received 8,637 matches across two reports.
1.5 The submission of data in relation to the non-domestic rates Small Business Bonus
Scheme (SBBS) was delayed as a revaluation was due on 1 April 2023.  A request for
the submission of this data has now been received and is required to be uploaded to
the NFI database by 30 September 2023.  Matches will be received shortly after this
date and reviewed thereafter. 
2. Report
NFI progress to date
2.1 Audit Scotland has indicated that they do not expect every match or report to be
reviewed and has advised bodies to prioritise matches.  As such, they have categorised
the individual reports based on the assessed quality of match (high, medium, address
or information only), with ‘high’ reports often being matched on National Insurance
Number.  Additionally, all matches contained in reports have been allocated a ‘risk
scoring’ based on a combination of the likelihood of fraud occurring and the number of
times an individual appears across the NFI data.
2.2 Given the high volume of matches received, there are limitations to the number of
matches that can be reviewed within the resources available.  Services are responsible
for determining a method of prioritising their matches for investigation, ensuring timely
action and update of the NFI database.  This is generally done by considering the risk
scoring allocated on the NFI database.
2.3 As of 24 July, 8,325 (73%) matches have been reviewed, resulting in 622 errors with
£26,518 savings identified.  A summary of the results by report type is detailed in the
table below.  
Page 138 of 240

Page 143

Report Type Matches Processed In
progress Fraud Error Value
(£)
Housing Benefit 160 121 0 0 1 2,047
Council Tax
Reduction
1,063 448 2 0 54 24,471
Payroll 158 124 25 0 0 0
Blue Badges 1,189 1,189 0 0 567 0
Creditors 5,921 5,446 29 0 0 0
Procurement 92 88 4 0 0 0
Housing Tenants 1,140 516 230 0 0 0
Housing Waiting
List
1,638 59 44 0 0 0
Total 11,361 7,991 334 0 622 £26,518 
2.4 Matches relating to housing benefit and council tax reduction are being dealt with by
the Appeals and Adjudications team within Financial Solutions.   The team has
prioritised high and medium risk housing benefit reports, and review of these reports is
almost complete.  They have also commenced the review of high and medium risk
council tax reduction reports and completion of these report is expected by December
2023.
2.5 Internal Audit assessed payroll matches where North Lanarkshire Council employees
are also employed by other public sector organisations.  These matches are generally
innocent, although public bodies have previously identified some matches to be
indicative of ‘ghost’ employees with individuals holding multiple employments whilst on
sick leave with one of the bodies.  Review of these matches was prioritised and initially
focused on employees earning more than £10,000 per annum with both bodies, then
considered the remaining matches.  No issues have been identified.  
2.6 The review of matches relating to active blue badges to deceased persons is complete
and has resulted in 566 badges being cancelled.  The number of badges cancelled
during this exercise is relatively similar to that from previous NFI exercises which
indicates that the ‘Tell Us Once’ process is not yet providing an effective mechanism to
facilitate the cancellation of deceased persons badges timeously.  Internal Audit will
liaise with the relevant Service to consider and identify any alternative mechanisms to
facilitate quicker identification and cancellation of blue badges for deceased persons.
2.7 Creditors matches, relating to potential duplicate payments and creditors references
accounts for 52% of the total matches received and the majority of these (91%) fall into
two reports matched on invoice number, invoice amount and/or creditor reference. 
Internal Audit has undertaken an initial review of these matches and has identified that
they contain many false positives as some suppliers (i.e. utilities) have regular monthly
charges using the same account reference as the invoice number.  As such, review of
these matches has been prioritised to focus on those where the potential for duplicate
payments is greatest and the invoice value is most significant.  Review of these
matches remains ongoing, however, to date, only a small number of potential duplicate
payments have been identified and these are in the process of being investigated
further by Internal Audit. 
Page 139 of 240

Page 144

2.8 Matches relating to procurement involve a comparison of North Lanarkshire Council
employees to Companies House information and creditor payments to identify any
potential undeclared conflicts of interest.  Internal Audit has reviewed these matches
and has identified 13 matches which are currently being investigated further.
2.9 Review of housing tenant and waiting list matches is progressing better than in previous
NFI exercises.  To date, 31% of the matches have been reviewed and we have been
advised that the Service has plans in place to review further matches.  Of the matches
reviewed, 274 (47%) require further investigation and checking by localities, and plans
are in place ensure that action is taken to update the HSMS system as appropriate and
‘close off’ these matches.
2.10 The NFI has a mandatory requirement to submit council tax single persons discount
(SPD) records for matching against electoral data.  Finance have previously
determined that there is little or no merit in allocating scarce resources to review these
matches in detail.  Instead, the Service outsourced a separate exercise to an external
third-party to match and review council tax SPD records to credit reference data.  This
exercise was undertaken between July 2022 and April 2023 and the outcome is
detailed in the table below. 
Number of
SPD records
SPDs
cancelled
Value of
cancelled SPDs
All SPD Records 38,251 2,350 £608,200
Of which are NFI matches 8,842 1,077 £296,127 
2.11 These outcomes indicate that the data matching exercise undertaken by Finance was
more constructive than simply reviewing the NFI matches as it resulted in over double
the value of potential income generation.  It should be noted, however, that the value
of potential income generation is the additional revenue billed and not the revenue
collected and that this may change because of subsequent changes in household
circumstances/composition and the non-payment of council tax. 
3. Measures of success
3.1  Successful participation in NFI 2022 will result in error, fraud and potential savings
identified and positive assessment by the Council’s external auditor of the Council’s
approach. 
Ken Adamson, Chief Officer (Audit and Risk)  
Page 140 of 240

Page 145

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact because of the Public Sector Equality
Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Future data matching arrangements will be reviewed to ensure the Council remains legally
compliant with recent legislative changes.
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the data subject? 
Yes ☐ No ☒
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any environmental
or carbon matters? 
Yes ☐ No ☒
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s communications
activities? 
Yes ☐ No ☒
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts, highlighting where
the risk(s) are assessed and recorded and how they are managed?
Failure to participate in the NFI could result in non-compliance with legislation, criticism from
external audit and create additional potential for fraudulent activity not being identified at an
early stage.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does it
relate to healthcare, housing, or education services for in-Service or ex-Service personnel, or
their families, or widow(er)s)? 
Yes ☐ No ☒
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service delivery, policy,
or plan that has an impact on children and young people up to the age of 18, or on a specific
group of these? 
Yes ☐ No ☒ 
Page 141 of 240

Page 146

Page 142 of 240

Page 147

North Lanarkshire Council
Report
Audit and Scrutiny Panel
Does this report require to be approved? ☐ Yes   ☒ No
Ref: KA/ASP/August 2023 Date 04/09/23
Risk management update (and 2023-24 corporate risk register) 
From  Ken Adamson, Chief Officer (Audit and Risk)
E-mail adamsonk@northlan.gov.uk Telephone 07939 280602 
Executive Summary
This report provides members with an update on key risk management developments with a
particular focus on the results of the recent annual review of the corporate risk register, as
well as providing Panel for the first time with a snapshot of the highest current residual risks
within Service risk registers.
The corporate risk register is formally reviewed annually to ensure completeness and
continuing alignment to the council’s strategic objectives, The Plan for North Lanarkshire and
the associated Programme of Work.  The purpose of this report is to update Panel on the
results of that process and to present the corporate risk register for 2023-24 as approved by
the Council’s corporate management team (CMT).
The review of the corporate risk register was informed by a number of different sources
including an updated horizon scanning document (Appendix 2) which was used to support
consideration of the key strategic and operational risks facing the Council.  The risk team has
also engaged with Services to consider whether any risks within Service-level risk registers
merited escalation to the corporate risk register and undertook informal comparisons with
other local authorities’ corporate risk registers to inform the process.
Members should note that all corporate risks identified and agreed as meriting inclusion in the
corporate risk register are subject to regular monitoring and review by relevant senior
management and periodic review/consideration of individual risks by both the CMT and the
Audit and Scrutiny Panel in line with their respective governance roles.
Overall, although there are some changes in individual risk scores, as might be expected
much of the corporate risk register for 2023-24 is substantively unchanged from the previous
year.  Key changes are the removal of 2 risks (‘Implementation of ERDP’  and ‘Information
Governance – Data Migration’), the addition of four new risks (relating to increased fire risk
following recent changes in Scottish Fire and Rescue attendance policy, home support
sustainability, the Council’s power resilience and the risk of failing to corporately maximise
opportunities from digital adoption), and the escalation of one risk (‘Home to School Transport
Provision/Sustainability’) from the Education & Families service risk register.
It should also be noted that, due to the application of the new risk ratings and thresholds as
approved in the revised Corporate Risk Management Strategy approved by Policy and
Strategy Committee in March 2023, the corporate risk register profile looks somewhat different
than previous versions in terms of the scoring and RAG ratings. 
Item 10
Page 143 of 240

Page 148

Recommendations
The Panel is asked to consider the contents of the report and to:
(1) note the agreed corporate risk register for 2023/24 at Appendix 1 which incorporates the
range of agreed changes outlined in Section 2 of the report;
(2) note the information contained within the report in respect of risk management
arrangements within Services (including information on those risks with the highest
residual risk scores); and
(3) agree to request a further report from the Chief Officer (Audit and Risk) informing a future
meeting of the Panel of the results of planned work to assess compliance with the newly
approved Risk Management strategy. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Page 144 of 240

Page 149

1. Background
1.1  The Risk Management Strategy requires that the corporate risk register is formally
reviewed on an annual basis; led by the Corporate Risk Team, working with the Risk
Management Corporate Working Group (RMCWG) on behalf of, and in consultation
with, the Corporate Management Team.  In addition, each Service is required to
maintain its own risk register in respect of the operational risks within their areas of
responsibility.
1.2 In addition to considering the wider environment within which the council operates,
each year the corporate risk register is reviewed for completeness and continuing
alignment with the council’s strategic objectives, The Plan for North Lanarkshire and
the associated Programme of Work.
1.3 This year’s annual review exercise has recently been undertaken on behalf of CMT. 
This has involved discussion with members of the RMCWG, to consider potential
issues arising from individual Service risk registers.  Informal external benchmarking
with corporate risk registers of other councils has also been carried out.  Most
importantly the review has been informed by, and considered against, The Plan for
North Lanarkshire and the revised and evolving ‘Programme of Work to 2028’
approved by Policy and Strategy Committee in March 2023.
1.4 The environment within which the council operates and provides services continues to
be dynamic.  The corporate risk register must therefore continually evolve to keep pace
with and accurately reflect, the ongoing challenges facing the Council.  To aid this
process, the Corporate Risk Team updated a ‘horizon scanning’ paper to support
CMT’s considerations/discussions on risks associated with the council’s future
direction and strategic planning considerations.  The paper, attached at Appendix 2, is
intended to highlight risks and issues relevant to the environment within which the
Council operates.  The paper can also be used to generate discussion and inform
thinking in relation to the preparation and review of individual Service Risk Registers.
1.5 This paper presents the outcome from this year’s corporate risk register review process
and allows the Panel to note the corporate risk register for 2023-24 as outlined in the
table at Appendix 1.
1.6 Members will note a change in the risk profile and are reminded this is primarily due to
the change in risk ratings and thresholds which was approved as part of the revised
Risk Management Strategy approved by the Policy and Strategy Committee in March
2023.  This means there are now five ratings categories (Very High, High, Medium,
Low and Insignificant risk). 
2. Report
2.1 The current corporate risk register previously approved for 2022-23 contained 25 risks
as outlined in the table at Appendix 1.  Risks contained within the register have been
subject to ongoing monitoring and review throughout the year, with regular risk
reporting to CMT and Audit and Scrutiny Panel both on the overall register, and with
detail on individual risks being reported by relevant Risk Leads.
2.2 Of those existing 25 risks, 24 are classified as ‘Live’ with completed risk
documentation, and 1 risk (Target Operating Model) classified as ‘Draft’ where relevant
documentation is currently being finalised.  
Page 145 of 240

Page 150

2.3 As stated in the Corporate Risk Management Strategy, the definition of corporate risks
is:
‘Risks which can impact the Council in achieving its priorities and stated objectives
or which are more strategic in nature and require corporate oversight.  For example,
such risks may have the potential to impact many Services, and/or can impact
significantly on the Council in terms of financial costs and reputational damage.  The
Corporate Risk Register will reflect an amalgamated position of Service-level risks
and may also include significant Service-level risks which have been escalated for
attention at a strategic level.’
2.4 As previously reported, a number of methods have been used and information sources
reviewed to stimulate a thorough approach to the corporate risk register review process
including:
• Review of the Programme of Work to 2028 considering how and whether risks in
relation to key planned Programme of Work activities are adequately reflected
within corporate, service and/or project risk registers;
• Services were asked to highlight any key risks within Service risk registers that
they considered may merit consideration for inclusion in the corporate risk register
going forward;
• Informal comparisons/benchmarking was done with other local authorities’
corporate risk registers, to help inform the review process and to identify any
relevant areas which may have been overlooked; and
• The corporate risk team has updated its ‘horizon scanning’ information to support
CMT discussions and strategic planning considerations and consideration of new
and emerging risks.  This paper has been developed through examination of a
range of external sources including public sector risk partner Zurich Municipal’s
white paper ‘Rising to the Challenge’ focussing on the future of the public and
voluntary sectors, as well as relevant materials from the National Audit Office, Audit
Scotland and HM Treasury.
2.5 The corporate risk register should be reflective of what the Council is seeking to
achieve at a strategic level with risks relating to key projects or programmes captured. 
The governance arrangements in respect of the recently refreshed Programme of Work
to 2028 are still evolving and it will be important to ensure that appropriate risk
management arrangements are embedded within these.  To that end, Audit and Risk
staff are involved in each of the thematic boards to provide relevant support to SROs
to ensure proper consideration is given to risk management and the identification and
capture of appropriate risk information.  Generally though it is believed that risks in
relation to key planned activities being undertaken are largely already captured either
at corporate, service or project level, although it is recognised that there is scope to
better reflect the interdependencies between certain key projects and workstreams and
how failure to recognise this could impact the achievement of certain key objectives.
2.6 A ‘sense-check’ or informal benchmark review of other council’s corporate risk
registers has also confirmed that the content of the Council’s corporate risk register
remains valid and comprehensive, and broadly consistent with other council’s risk
registers with no obvious omissions.
2.7 Changes because of the review process are detailed throughout the remainder of this
report.  
Page 146 of 240

Page 151

Review of the 2022-23 Corporate Risk Register
2.8 Most of the existing risks contained within the 2022-23 corporate risk register remain
relevant and are included in the approved 2023-24 version.  Existing risks are subject
to regular review by the relevant Risk Lead and associated governance groups.
2.9  RIS0000574: Information Governance – Data Migration was always a time limited risk
in relation to target dates associated with the transfer of Council data to new operating
systems/platforms.  As such it has been agreed with the Risk Lead, Chief Officer
(Business & Digital) that this risk should be closed and that any remaining residual
risks be reflected within individual Service risk registers.  As a result, CMT agreed that
this risk should be removed from the corporate risk register.
2.10 Consideration has also been given to removing Risk RIS0000259: Implementation of
ERDP as a corporate risk.  Recognising the diverse range of activities being
progressed under this heading and the long-tail nature of many of the associated
programme/projects, it is considered that it would be more appropriate to remove this
risk from the corporate risk register, recognising that appropriate management and
oversight of associated relevant risks is achieved through the current and evolving
governance and project management arrangements that will apply under the new
‘Transforming Places’ Programme of Work Board.
New risks added to the corporate risk register
2.11 From July 2023, Scottish Fire & Rescue Services (SFRS) will be implementing
changes to their operating arrangements, meaning in certain circumstances local
authorities will be required to take on the additional responsibility in the event of an
alarm activation, of providing positive confirmation of the existence of fire.  This has
wide-ranging implications across the organisation for existing fire risk management
arrangements, with tight implementation deadlines as well as potentially significant
staffing and financial impacts.  Therefore a new risk relating to the ‘Impact of Scottish
Fire & Rescue Service (SFRS) changes to operating arrangements’, is currently being
finalised to capture the range of organisational impacts arising and to reflect current
and planned mitigating actions, and it was agreed this new risk be added to the
corporate risk register.
2.12 Members will be aware of the ongoing challenges faced in the delivery of Home
Support Services within Adult Health & Social Care.  As a result of increasing risks and
issues in service delivery and sustainability, CMT agreed that a new risk ‘Home
Support Service Delivery/Sustainability’ be added to the corporate risk register which
will provide a high-level risk management perspective on these risks, the current
efficacy of existing controls/actions and future planned actions to mitigate, with links to
the resulting Home Support redesign project.  It is considered important that potential
threats to what is a critical service for some of the most vulnerable in our communities,
are reflected in a key corporate risk with oversight at the appropriate level of the
organisation.  A deep dive risk assessment has been finalised and agreed with the
Chief Officer (Adult Social Work Services), and has a residual risk rating of ‘25 - Very
High’ as noted in the risk register at Appendix 1.  
2.13 Members will also be aware of Scottish Government’s request that all public bodies
should have a stand-alone Power Resilience Strategy which would be enacted in the
event of any failure of the national grid system, otherwise known as ‘Black Start’.  This
has been the subject of separate reports to both CMT and the Panel from the Chief
Officer (Community Operations), where it was noted that the absence of any strategy
and/or inadequate arrangements relevant to a Black Start event could expose the
Council to significant criticism and potential legal challenge, and that the risk with
regards to Power Resilience should be a stand-alone Corporate risk.  
Page 147 of 240

Page 152

2.14 RIS0000620: Power Resilience has therefore been finalised and agreed with the Chief
Officer (Community Operations) which outlines the risk of the Council having
inadequate arrangements in the event of complete failure of the national electricity grid
because of not being adequately prepared.  The risk has been scored with a residual
risk rating of 20 – HIGH, which considers that currently although there has been the
introduction of the power resilience strategy and associated actions; which should
result in measures which will reduce the risk to life; the scale and magnitude of the
event may still result in the Council being unable to cope with all demands that will be
placed upon it, some of which remain unknown and/or are difficult to predict.  A number
of planned actions are in place which as they are progressed are expected to help to
reduce the risk rating.
2.15 The final new risk which has been added relates to the risk of the Council failing to
corporately maximise opportunities from digital adoption.  This risk is currently being
worked-up and has yet to be scored but reflects the challenges and issues which might
prevent the Council from maximising opportunities presented by new digital
technologies to drive changes in the Council’s operating model and service delivery.
Risks escalated and/or de-escalated from Service risk registers
Escalation
2.16 Panel will be aware of ongoing challenges in the provision and financial sustainability
of school transport with significant issues being encountered post-pandemic in relation
to market capacity, pricing and contractor reliability.  Following this and to support the
ongoing review of current and future service provision, it was agreed that it would be
appropriate to create a new risk around sustainability of ‘Home to School Transport
provision’ more generally, with links to the redesign project underway.  To this end a
risk has been created and was agreed for inclusion on the corporate risk register.
2.17 There were 25 risks on the corporate risk register in 2022-23.  The removal of the 2
risks above and the addition of 5 new risks means that the corporate risk register for
2023-24 has 28 risks.  Currently 23 of these risks are ‘Live’ and fully documented, while
5 are in ‘Draft’ and are currently being finalised.
2.18 Ongoing monitoring and review of these corporate risks ensures that the ongoing
effectiveness of current controls in managing the relevant risk is assessed and future
actions to mitigate risks are planned and monitored.  Further detail on the management
of each risk is available within the accompanying deep dive risk assessment
documentation via the Council’s Figtree risk management system.
Service risk registers – risks with highest residual risk scores
2.19 Members will recall the proposal to supplement the corporate/strategic risk register
information included in this report with information on service risks from service risk
registers to enable members to have sight of those service risks with the highest
residual risk scores.
2.20 The Corporate Risk Team has been and continues to work with Service Risk
Champions to ensure that Service Management Teams are able to meet their
responsibilities for monitoring and reviewing service risks/registers as noted within
SMT revised Terms of Reference, which require that SMT’s will ‘Regularly review and
monitor service risk registers, ensuring that registers are complete and up to date, that
new and emerging risks are identified assessed and managed effectively, and that
service risk registers are used to support management discussions and inform
decision-making.’  
Page 148 of 240

Page 153

2.21 There has been extensive ongoing activity in reviewing service risk registers to ensure
that services are able to report on their ‘top Service risks’.  The corporate risk team
continues to provide support and co-ordination across all services and through Service
Risk Champions and the recently established Service Risk Forums, to help facilitate
this.  Significant work has also been undertaken to ensure that SMTs are provided with
appropriate, consistent and regular information in relation to risk management
arrangements within Services.  Crucially SMTs are expected to ensure that their
Service has assessed whether risk registers are comprehensive and up-to-date and
that any new or emerging risks have been properly identified and assessed, as well as
considering and advising whether there are any key service risks that are not reflected
and should be added to the register.
2.22 Details of the risks with the highest residual score for each Service can be found at
Appendix 3.  The tables below provide members with insight into the coverage and
position across service risk registers.  In accordance with the Council’s risk
management process, the risks are categorised as Insignificant, Low, Medium, High
and Very High.
2.23 In summary, the evaluation of all services’ risk registers shows the current risk profile
as:
Evaluation Insignificant Low Medium High Very high Total
No. of Risks 101 237 171 21 0 530
2.24 The number and profile of risks between each of the services is as follows:
Number and profile of risks in risk registers - Chief Executive’s Service
Evaluation Insignificant Low Medium High Very high Total
No. of Risks 58 83 41 5 0 187 
Number and profile of risks in risk registers – Education and Families
Evaluation Insignificant Low Medium High Very high Total
No. of Risks 8 18 24 2 0 52
Number and profile of risks in risk registers – Adult Health and Social Care
Evaluation Insignificant Low Medium High Very high Total
No. of Risks 1 7 11 3 0 22
Number and profile of risks in risk registers – Enterprise and Communities
Evaluation Insignificant Low Medium High Very high Total
No. of Risks 33 129 92 10 0 264
2.25 Good progress has been made across services in the embedding of risk management
practice, however it is important to recognise that there continues to be differing levels
of maturity within services.  Steps will continue to be taken to support services to
ensure that the risk management processes are fully adopted and that risk registers
are comprehensive and up to date and subject to regular review and scrutiny meaning
risk information will become more and more reliable and robust.  
Page 149 of 240

Page 154

2.26 Of particular importance will be providing continual challenge and stimulus towards
ensuring that registers have captured and properly articulated the key risks which they
face, indeed service’s review activity so far has already identified some gaps which
service risk champions and facilitators will be following up with Senior Management
teams to develop and include new risks in registers.
2.27 It is particularly worth noting however, since the review of senior management
arrangements at the beginning of 2023, and specifically the inclusion of risk
management oversight responsibilities in SMT Terms of Reference, there is renewed
focus and momentum underway across all services.  This, coupled with the introduction
of the newly formed service risk forums means there is now more regular input, an
opportunity to share best practice and to discuss risks, with a clear level of
management support targeted to help facilitate improved risk management activities
and oversight.
2.28 Whilst all of this enables positive steps to be made, it is important to recognise that
these arrangements are relatively new and will require some time to fully bed in and
become established.  The skills, experience and capacity of members of the risk
network across the service will continue to evolve, and risk information and discussions
will mature with each cycle of reporting.
2.29 The Corporate Risk Management Team will continue to assist Services in assessing
training needs and delivering appropriate training.  In addition, during the remainder of
2023-24, a particular focus for the Corporate Risk Management Team will be on work
to evidence and assess compliance with the new Risk Management Strategy including
arrangements within Services.  The results of this compliance work will be included in
future update reports to senior management and the Panel.
Other risk management developments 
2.30 The Corporate Risk Team continues to actively support the application of risk
management in a number of key corporate projects including most recently Home
Support Redesign and Home to School Transport redesign.
2.31 The Corporate Risk Team is also providing support to the newly formed Programme of
Work Thematic Boards, to assist in ensuring that appropriate risk management
arrangements are embedded within these new governance arrangements.  Specifically
working with the Senior Responsible Officers (SROs) for each theme, there is support
ongoing in the development of an appropriate risk assessment methodology to enable
Boards to identify high level risks which could impede their successful operation.
2.32 Building capacity within the risk network across services has also been of recent focus
for the Corporate Risk Team, with four training sessions having been held during May
2023 covering 61 members of the risk network across the organisation.  The sessions
focussed on ensuring that all relevant staff have a clear understanding of the newly
approved Risk Management Strategy, their detailed roles and responsibilities and
associated risk management processes.  Further sessions are being planned to build
knowledge of risk management as part of the Council’s approach to project
management as well as specific sessions to enhance Figtree system
admin/maintenance skills. 
3. Measures of success
3.1 The corporate risk management team will continue to report quarterly to CMT and the
Audit and Scrutiny Panel providing an overview of key developments in risk
management and updating on progress in respect of planned improvements to the
Council’s risk management arrangements.
3.2 The adequacy and effectiveness of the Council’s risk management arrangements will
be independently and regularly reviewed by Internal Audit, who will report directly on
the results of that work to the Audit and Scrutiny Panel.   Page 150 of 240

Page 155

3.3 Effective risk management arrangements assist the Council in achieving planned
outcomes and/or help the Council mitigate the impacts of adverse events. 
4. Supporting documentation  
Appendix 1: 2023-24 corporate risk register
Appendix 2:  Current strategic risks and issues facing the Council – May 2023
Appendix 3:  Service risks with the highest residual risk scores 
Ken Adamson
Chief Officer (Audit and Risk)  
Page 151 of 240

Page 156

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact because of the Public Sector Equality
Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data?   
Yes ☐ No ☒
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any environmental
or carbon matters? 
Yes ☐ No ☒
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s communications
activities? 
Yes ☐ No ☒
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If yes, please provide a summary of the key risks and potential impacts, highlighting where the
risk(s) are assessed and recorded (e.g., Corporate or Service or Project Risk Registers), and
how they are managed?
Effective risk management arrangements will enable the Council to manage its risks more
effectively, increasing the likelihood of the Council achieving its plans and ambitions by
minimising or mitigating potential threats to planned outcomes.  A robust Risk Management
strategy lays out the framework and underpins all risk management activity across the
organisation.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does it
relate to healthcare, housing, or education services for in-Service or ex-Service personnel, or
their families, or widow(er)s)? 
Yes ☐ No ☒
5.11      Childrens rights and wellbeing impact
Does the report contain any information regarding any council activity, service delivery, policy,
or plan that has an impact on children and young people up to the age of 18, or on a specific
group of these?
Yes ☐         No ☒ 
Page 152 of 240

Page 157

Appendix 1: 2023-24 corporate risk register  
CORPORATE RISKS (Operational) Likelihood Impact Rating Evaluation
1. Impact of proposal to create a National Care Service 5 5 25 Very High
2. Home Support Service Delivery/Sustainability 5 5 25 Very High
3. Information Security and Information Governance 5 4 20 High
4. ICT operational capability 4 4 16 High
5. Public Protection 4 4 16 High
6. Human Resources 4 4 16 High
7. Governance, Leadership and Decision-Making 4 4 16 High
8. Supply Chain risk  4 4 16 High
9. Scottish Child Abuse Inquiry 4 4 16 High
10. Health and Safety 5 3 15 Medium
11. Business continuity planning 5 3 15 Medium
12. Terrorism 3 5 15 Medium
13. Procurement risk 3 4 12 Medium
14. Resilience planning 2 5 10 Medium
15. Serious organised crime, fraud and corruption  3 3 9 Medium
16. Impact of changes to SFRS operating arrangements To be
confirmed
To be
confirmed
To be
confirmed
To be
confirmed
17. Home to School Transport Delivery/Sustainability To be
confirmed
To be
confirmed
To be
confirmed
To be
confirmed
CORPORATE RISKS (Strategic) Likelihood Impact Rating Proximity
18. Tackling Poverty 5 4 20 High
19. Power Resilience (Black Start) 5 4 20 High
20. Climate Change 4 4 16 High
21. Financial Sustainability 3 5 15 Medium
22. Enterprise Project 3 4 12 Medium
23. Managing strategic change  3 4 12 Medium
24. Digital and IT strategy 4 3 12 Medium
25. Engagement and consultation 3 3 9 Medium
26. Improving Educational Outcomes 3 3 9 Medium
27. Target Operating Model To be
confirmed
To be
confirmed
To be
confirmed
To be
confirmed
28. Digital adoption To be
confirmed
To be
confirmed
To be
confirmed
To be
confirmed
RISKS REMOVED FROM THE CORPORATE RISK REGISTER 
Information Governance – Data Migration 5 5 25 Very High
Implementation of the ERDP 3 5 15 High
Page 153 of 240

Page 158

Appendix 2
Current strategic risks and issues facing NLC May 2023
The Corporate Risk Team have prepared this note to support CMT discussions on the
Council’s future direction and strategic planning considerations and represents an informed
horizon scanning of the environment within which the Council will operate.
It does not highlight all those risks currently on the corporate risk register, particularly those
that relate to the management of day-to-day operations of the Council, but rather attempts to
highlight where current corporate risks relate to the broad strategic themes highlighted in the
document.
1. Constitutional uncertainty
Links to existing corporate risks: ‘Managing strategic change’ and ‘Impact of National Care
Service’.
• A new First Minister with uncertainty over likely future direction in a number of key policy
areas including proposals relating to National Care Service, potential moves towards
greater national or regional collaboration in Education and on decisions about the future
composition of Scottish local government and/or wider public sector reform.
• Following Brexit, it remains unclear how the UK internal market (across England,
Scotland, Wales, and Northern Ireland) will operate and how some aspects of the existing
devolution structures will operate.
• The process of implementing the Scotland Act 2016 remains incomplete (VAT
assignment and full adoption of social security powers).  The fiscal framework and
decisions made by the Scottish Government continues to ensure that it faces challenging
financial pressures with Audit Scotland highlighting significant uncertainties over the
financial sustainability of the current Scottish public sector landscape.
• The UK Government has committed to providing funding to replace previous EU
programmes and as part of its levelling up agenda.  It is not yet clear how these funds will
operate in the longer-term.
2. Economic challenges
Links to existing corporate risks: ‘Implementation of ERDP’ ‘Digital and IT Strategy’
‘Educational attainment’ and ‘Climate change’ and ‘Tackling Poverty
• The pandemic resulted in an economic downturn and some sectors of the economy may
be permanently affected.  Although the economy is starting to recover following the
pandemic, the nature and extent of recovery remains unclear.  Establishing a more
digital, more inclusive economy will require time and significant investment in skills.  The
economy will have to reshape to enable climate change objectives to be met. 
Economic/inflationary pressures on household incomes may drive greater demand for
public services.
• Scotland’s fiscal framework means that public sector budgets are now more closely tied
to economic performance (and Scotland’s performance relative to the rest of the UK)
than at any time since devolution in 1999.  The Scottish economy continues to display
comparatively anaemic growth and productivity.
• The longer-term economic effects of exit from the European Union (due to changes in
access to markets and migration patterns) remain to be seen but most independent
commentators expect short and long-term impacts on growth.
• The war in Ukraine is having an impact on the wider economy and across the public
sector, in areas including policy, procurement and supply chains with consequential
impacts on rising costs, availability and a need for more focus on supply chain resilience.
• Rising prices and uncertainty are putting pressure on household incomes and may
drive greater demand for public services.  Public sector budgets are highly unlikely to
see inflation-linked increases and will have to absorb higher prices.  Page 154 of 240

Page 159

3. Financial sustainability 
Links to existing corporate risks: ‘Financial sustainability’
• A considerable proportion of the Scottish public sector budget is spent on the NHS and
social care.  Along with the effects of the pandemic, demographic change and medical
advances mean that despite being prioritised in successive Scottish Government
budgets (at the expense of local government) the pressure on these budgets is already
acute and appears insatiable.  Some NHS boards have already seen overspends,
despite the NHS budget having grown in real terms.
• The public sector already has many long-term financial commitments (pensions,
PFI/PPP/NPD payments) that extend decades into the future which constrains financial
flexibility.
• Prior to the pandemic, there were already concerns about the financial sustainability of
certain parts of the public sector in their current form including local government, health
and policing.  The pandemic focused attention on short-term priorities.  The need for
medium and long-term financial planning remains but now needs to account for the
financial impact of the pandemic as well and the need to meet climate change objectives
and respond to existing budget pressures within the Scottish Government.
4. Addressing inequalities
Links to existing corporate risks: ‘Tackling Poverty’, Implementation of ERDP’ and
‘Educational Attainment’.
• There is still much progress to be made to reduce inequalities and protect human rights. 
Areas affected include wealth, health, wellbeing, and education and in many cases,
existing challenges or pressures have been accentuated by the pandemic.  Inequalities
affect multiple different groups in complex and interacting ways.  Child poverty is a major
issue with significant long-term effects if not addressed.
• There are profound geographical inequalities across Scotland and within individual
Council areas.  The aging population creates significant additional pressures and issues.
• There is a need to capture users’ perspectives and enable communities to have greater
power and influence over what matters to them through increased community
engagement and more meaningful participation in the planning/design and delivery of
public services.
5. Performance and innovation
Links to existing corporate risks: ‘‘Governance, leadership and decision-making’ ‘Information
security and governance’, ICT operational capability’, ‘Digital and IT strategy’
• Ten years since the Christie report, there is still limited evidence of a significant shift
towards preventive spending.  There is a risk that public-sector reform is not happening
at sufficient pace to ensure the shift to greater preventative spending, a focus on
outcomes and the renewal of public services.
• Before the pandemic, financial pressures were affecting how well some public services
were performing.  The pandemic has exacerbated this.  This may affect delivery of the
outcomes in the National Performance Framework, such as reducing educational
inequalities.  The pandemic has exacerbated this, created backlogs and reduced
access to some public services and affected systems to monitor performance.  Gaps in
data hinder evidence-based decision making and performance monitoring.
• The proposals for a National Care Service represent one of the largest restructuring in
how public services are delivered since devolution.  This presents both risks and
opportunities for delivery.  The National Care Service proposals have the potential to
create significant challenges and strategic, financial, and operational risks to the
Council’s ability to deliver against its wider ambitions. 
Page 155 of 240

Page 160

• The pandemic has accelerated the shift to greater digital delivery of public services, but
true digital transformation remains a significant challenge to deliver and generates
risks around capacity, digital exclusion, cybersecurity, and fraud.
6. Leadership, workforce, and governance
Links to existing corporate risks: ‘Governance, leadership and decision-making’, ‘Human
Resources’ ‘Managing strategic change’, ‘Engagement and consultation’)
• Leadership roles are increasingly difficult to fill in parts of the public sector with
increased turnover/vacancies at senior (chief executive, director) levels.  There are
also challenges in recruiting some specialist skills.
• To secure long-term outcomes, collaborative leadership across organisations and
sectors is essential.  Achieving this remains challenging when existing public sector
structures and systems of incentives and accountability remain segmented.
• An ageing population, increasing demands for Council services, relatively inflexible
remuneration arrangements and a smaller working age population presents real
challenges for local authorities to ensure they remain an attractive option for younger
workers and can recruit and retain sufficient staff with the right skills and attributes. 
Also increased focus on ensuring our employees reflect the diversity of our local
communities.
• The expansion in the use of digital technology and of data and artificial intelligence
demands greater attention to digital governance to ensure that ethical, privacy and
equalities and human rights perspectives are properly considered.  There are also
heightened risks around cybersecurity, fraud and digital exclusion.
7. Other current and potential future corporate risks with strategic
considerations
• Public Protection: always a high-risk and high-profile issue.  Increased risks arising
from the pandemic and from the economic challenges facing many families and
communities will likely result in continuing pressures.
• Enterprise Project: refocused and narrower than originally envisaged but still a
significant project which will need to be successfully delivered to underpin key aspects
of service delivery and to contribute to the achievement of many of the Council’s wider
ambitions.
• Place-making: central to the Council’s ambitions and links the Council’s future
operating model and associated asset requirements and to the wider development and
delivery of the Town Centre Visions designed to create vibrant and sustainable towns
across North Lanarkshire.
• Working/collaborating with partners and other stakeholders – the Council increasingly
needs to work in partnership to address the complex challenges facing our towns and
communities.  This can be challenging and requires us to rely on the willingness,
capacity and ability of third parties to positively engage.
• Organisational resilience and agility – while the resilience of the organisation has been
well-tested, there remains a risk that our longer-term ability to anticipate and respond
to external factors is impaired, for example, because of further financial and workforce
pressures.  The maturity and effectiveness of key enablers such as risk management,
project management and contract management will directly affect how well we can,
identify, anticipate and respond to certain challenges.
• The Council is in the early stages of implementing revised governance arrangements
designed to support the delivery of the recently refreshed Programme of Work to 2028. 
The adequacy and effectiveness of these arrangements will be important in ensuring
that the Council can successfully progress planned actions and deliver against its
intended outcomes.
Ken Adamson, Chief Officer (Audit and Risk) 31 May 2023Page 156 of 240

Page 161

Appendix 2 - continued
Summary assessment of the potential impact/timing of identified strategic risks and whether these are currently increasing, stable or decreasing
Risk Timeframe Impacts Risk currently increasing, stable or decreasing from 2022 assessment?
Impacts of constitutional
uncertainties
Ongoing /
uncertain
Potentially
high
Stable – Although no short-term developments are currently envisaged, the medium-term political
context within which the Council operates continues to be fluid and uncertain.
Impacts of Scottish Government
policies such as the proposed
National Care Service and
potential future education reform
Short-term 1-3
years
Potentially
high
Stable – the NCS proposals creates significant operational, financial and strategic risks for the
Council and along with the wider direction of travel of other SG policies suggests uncertainty and a
possible future review of the current composition of Scottish local government.  The election of a
new First Minister has resulted in some of these developments being paused and/or reviewed.
Economic challenges Immediate High
Increasing – the post-Covid economic environment combined with current inflationary/cost of living
pressures has and will continue to significantly impact North Lanarkshire and its communities and
is likely to make the Council’s aspirations in this area more challenging to achieve.  The UK and
Scottish economies continue to display anaemic growth and low productivity growth.
Financial sustainability
Immediate and
likely to be
ongoing
High
Increasing- current/future pressures on NHS and impacts on future SG budgets of the use of
devolved income tax powers is likely to result in increased pressures on future LG budgets.  The
additional costs of settling 2022 pay disputes and challenges around future pay awards will only
create additional pressures.  Also, significant risks arising from current inflationary pressures on
Council budgets (and although currently expected to be relatively short-term, these could become
more embedded).
Inequalities: including wealth,
health, wellbeing, and education
Immediate and
ongoing High
Increasing – Covid’s impacts and the ongoing cost of living crisis and associated inflationary
pressures have generally worsened pre-existing inequalities across all aspects (wealth, health, well-
being, and education) making the Council’s aspirations in this area more challenging to achieve.
Performance and innovation
(including digital transformation)
Short-term 1-3
years
Medium to
High
Increasing – financial challenges, changing public expectations and ongoing performance
challenges are likely to require difficult decisions re-service delivery models and service redesign,
testing the Council’s organisational capacity to deliver.  New governance arrangements are being
rolled-out to progress the refreshed Programme of Work to 2028.
Leadership and workforce Short-term 1-3
years
Medium to
High
Increasing – longer-term demographic pressures have been exacerbated by Brexit and Covid
impacts; existing workforce pressures have already increased and the Council faces real challenges
to ensure it has the right workforce to deliver against its current and future ambitions.  Increased
risks arising from staff expectations that future pay awards will keep pace with current inflationary
pressures.  Increasing challenges around recruitment and retention of staff in some key disciplines,
Place making – range of activities
designed to create vibrant and
sustainable towns across NL
Longer term 3-
5 years
Medium to
High
Increasing - The Council’s aim to create vibrant and sustainable towns across North Lanarkshire
faces considerable challenges and the economic and wider societal impacts of the pandemic and
the cost-of-living crisis have only increased the pressures on existing town centres. 
Page 157 of 240

Page 162

Appendix 3  Service risk registers – risks with highest residual scores 
Chief Executive’s Service
Risk Title Residual
risk rating
1. Organisational capacity and retention of staff (RIA0000039). 20
2. Potential financial impacts arising from recent child abuse legislation and claims from
survivors of historical child abuse (recognised as unquantified contingent liability in the
22-23 draft annual accounts) (RIA0000212).
20
3. Potential that risk management arrangements are inadequate and/or ineffective
impacting on the Council’s ability to deliver services and/or achieve planned outcomes.
(RIS0000011)
16
4. Potential failure to effectively implement business change/service redesign processes
impacting on the realisation of planned benefits (and the Council’s ability to deliver
continuous improvement/best value). (RIA0000020)
16
5. Business continuity as related to Civic Centre responsibilities (RIA0000380) 15
Enterprise and Communities
Risk Title Residual
risk rating
1. Potential failure of key unsupported business systems impacting ability to generate
income leading to cash flow issues for NL Properties (CIMS) (RIA0000109) 16
2. Issues arising from Microsoft Teams Migration leading to potential data loss/corruption
in Town and Community Hub Delivery Programme (RIS0000576) 16
3. EV Charging requirements and challenges in Community Hubs (RIS0000634) 16
4. Inconsistencies in Statutory Authority requirements impacting delivery and cost within
projects in Town and Community Hub delivery programme (RIS0000632) 16
5. Recruitment and retention of staff impacting service delivery: Housing Management
(RIS0000612) 16
6. Recruitment and retention of staff impacting service delivery: Place (RIS0000617) 16
7. Impact of cost inflation on New Supply projects (RIS0000627) 16
8. IT System maintenance and development inhouse and potential lack of capacity of
internal resources to support HSMS impacting service delivery. (RIA0000012) 16
9. Recruitment and retention of staff impacting service delivery: Property and Projects
(RIA0000068) 16
10. Cost of living crisis, welfare system and energy costs for residents impacting income
and arrears for Housing Solutions. (RIA0000089) 16
Adult Health and Social Care
Risk Title Residual
risk rating
1. Data migration and information governance leading to service delivery issues and/or
business operations are interrupted. (RIS0000569) 16
2. Potential for enforcement action to Home Support Services (RIS0000584) 16
3. Analogue to digital transition (Telecare/Community Alarm) (RIS0000426) 16
Education and Families
Risk Title Residual
risk rating
1. Failure to ensure health, safety and wellbeing of learners/service users (RIA0000397) 20
2. Advocacy and representation for residents – financial inclusion (RIS0000671) 16  Page 158 of 240

Page 163

North Lanarkshire Council
Report
Audit and Scrutiny Panel 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    AA/SL Date 04/09/23 
Self-Evaluation of the Audit and Scrutiny Panel 
From  Archie Aitken, Chief Officer (Legal and Democratic)  
E-mail AitkenA@northlan.gov.uk   E-mail 07939 280102 
Executive Summary
Members of the Audit and Scrutiny Panel are well versed in the role of the Panel and its
statement of purpose to: 
• Provide independent assurance to the council and those charged with governance on
the adequacy of the council’s risk management framework and internal control
environment. 
• Provide independent review of the council’s governance, risk management,
performance, and control frameworks and oversee the financial reporting and annual
governance processes. 
• Oversee the council’s internal and external audit arrangements, helping to ensure
efficient and effective assurance arrangements are in place. 
• Undertake the scrutiny function within the council’s governance framework
(establishing short life task group reviews, as required) to undertake in-depth
examination of particular areas of policy and/or service delivery with a view to making
recommendations for improvement. 
The Panel is also a key component of the council’s corporate governance arrangements
which are subject to various review and assessment processes.  In 2021, an Internal
Audit review of Principles E, F, and G from the Delivering Good Governance in Local
Government: Framework (2016) considered there was a risk that “the council may not be
able to adequately demonstrate that it has effective audit committee arrangements and/or
arrangements to ensure Elected Members have the skills, knowledge and, where
appropriate or required, access to relevant training and resources to effectively undertake
their role”.   
In this respect, Internal Audit recommended that the Audit and Scrutiny Panel should, in
line with good practice, periodically undertake a self-assessment of (a) their performance
and activities against CIPFAs Audit Committees: Practical Guidance for Local Authorities
(2018), and (b) the effectiveness of the performance and activities of the Panel in
discharging the Scrutiny aspect of its role. 
To implement the Internal Audit recommendations, the self-evaluation exercise was
incorporated into the review programme for the council’s Strategic Self-Evaluation
Framework.  The evaluation framework, process, and timetable for the self-evaluation of
the Audit and Scrutiny Panel has been subsequently developed in line with the Strategic
Self-Evaluation Framework and customised in order to best meet the needs, operating
Item 11
Page 159 of 240

Page 164

1. Background 
1.1 The Audit and Scrutiny Panel are aware of the important role they play in relation to the 
council’s governance framework - through the discrete functions of both audit and
scrutiny - by providing an independent and high level resource to support good
governance and strong public financial management. The Panel’s role and
responsibilities in respect of the audit function reflect the standards set out in the
Chartered Institute of Public Finance and Accountancy (CIPFA) Position Statement:
Audit Committees in Local Authorities (2018) which is attached as Appendix 1.  This
role, and the wider Terms of Reference for the Panel which includes the scrutiny
function, is set out in the Scheme of Administration which was most recently approved
at the Council meeting in October 2022 (see Appendix 2).   
1.2 The council’s governance arrangements are reviewed on an annual basis through the 
Strategic Governance Framework which is a key item of evidence that informs the
development of the Annual Governance Statement.  Throughout the year various
aspects of corporate governance are also subject to review through the Internal Audit
programme of work.  These processes support the council in demonstrating compliance
with, and commitment to, the good governance principles as set out in the national
Delivering Good Governance in Local Government: Framework (2016), which can be
found in the appendix to the Strategic Governance Framework that was approved by
the Panel in June 2023. 
1.3 A review of Principles E, F, and G from the Delivering Good Governance in Local
Government: Framework (2016) was undertaken by Internal Audit in 2021.  This
focused on the aspect of corporate governance that relates to the following: 
• Principle E - Developing the entity’s capacity, including the capability of its
leadership and the individuals within it.
• Principle F - Managing risks and performance through robust internal control and
strong public financial management.
• Principle G - Implementing good practices in transparency, reporting, and audit to
deliver effective accountability. 
environment, and desired outcomes of the function being evaluated. 
This report provides Elected Members on the Panel with an advance overview of the
evaluation framework, process, and timetable for the self-evaluation of the Audit and
Scrutiny Panel. 
Recommendations
It is recommended that the Audit and Scrutiny Panel: 
(1) Are aware of the requirement to undergo a self-evaluation of the Panel in line with
Internal Audit recommendations, and
(2) Endorse the approach to the self-evaluation exercise which is set out in this report.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Page 160 of 240

Page 165

1.4 In relation to the effectiveness of the Audit and Scrutiny Panel, the Internal Audit report
(submitted to the Panel in March 2021) considered there was a risk that “the council
may not be able to adequately demonstrate that it has effective audit committee
arrangements and/or arrangements to ensure Elected Members have the skills,
knowledge and, where appropriate or required, access to relevant training and
resources to effectively undertake their role”.  In this respect, Internal Audit
recommended that the Audit and Scrutiny Panel should, in line with good practice,
periodically undertake a self-evaluation of how effectively it is discharging its role by
introducing: 
a) “A formal process whereby the Audit and Scrutiny Panel periodically undertakes a
self-assessment of their performance and activities against CIPFAs Audit
Committees: Practical Guidance for Local Authorities (2018), with a report outlining
the results of this review including any improvement actions being presented to the
Panel and reported to the Policy and Strategy Committee.”
b) “A formal process whereby the Audit and Scrutiny Panel periodically undertakes a
separate self- assessment of the effectiveness of the performance and activities of
the Panel in discharging the Scrutiny aspect of its role.” 
1.5 Given the membership of the Audit and Scrutiny Panel changed following the Local 
Government elections in May 2022, implementation of these Internal Audit
recommendations was rescheduled to allow time for the new arrangements to become
more fully embedded.  In the meantime the self-evaluation exercise was incorporated
into the rolling review programme that supports the council’s Strategic Self-Evaluation
Framework, which the Panel has oversight of on an annual basis. 
1.6 Members will recall the Strategic Self-Evaluation Framework is one of six inter-related
strategic frameworks (Policy, Governance, Performance, Self-Evaluation, Project
Management, and Demonstrating Improved Outcomes for Communities) that aim to
maintain a corporate one council approach across the organisation.  These
Frameworks are key to assessing the success of The Plan for North Lanarkshire and
monitoring delivery of the Programme of Work, while ensuring each stage of delivery
towards achieving the overall vision is appropriately aligned, planned, guided,
implemented, and governed. 
1.7 To ensure high level support for each self-evaluation exercise the council undertakes
in line with the Strategic Self-Evaluation Framework rolling review programme, the
Corporate Management Team agreed in July 2021 that a Chief Officer would be
assigned as a Champion for each exercise.  For the self-evaluation of the Audit and
Scrutiny Panel, the Chief Officer (Legal and Democratic) has been assigned the role of
Champion; responsibilities in this respect are set out below. 
• Provide leadership, commitment, motivation, and recognition to the introduction
and execution of the self-evaluation exercise.
• Communicate the purpose and the benefits, and challenge resistance.  
• Ensure resultant improvement actions are valid and used to inform improvements
to what the council ultimately aims to achieve. 
1.8 Within the aforementioned context, development work has progressed to establish the
approach to be undertaken in order to fulfil the Internal Audit recommendations.  This
report herewith - from the Chief Officer (Legal and Democratic) in his role as Champion
for the self-evaluation exercise - provides the Audit and Scrutiny Panel with an advance
overview of the evaluation framework, process, and timetable for the self-evaluation of
the Audit and Scrutiny Panel. While there are two specific Internal Audit
recommendations in this respect, the self-evaluation exercise has been combined into
Page 161 of 240

Page 166

one to avoid duplicating the use of both Elected Member’s time and officer resources,
and to enable the Audit and Scrutiny Panel to be considered as a single entity and
thereby ensure that any improvement actions identified complement the effective
operation of both the audit and scrutiny aspects of the Panel and not just one at the
expense of the other. 
2. Self-Evaluation 
2.1 Undertaken in line with the corporate approach set out in the Strategic Self-Evaluation
Framework, the self-evaluation of the Audit and Scrutiny Panel aims to answer three
simple questions - How well are we doing?  How do we know? (i.e. What evidence is
there to support the view of how well we are doing?), and How can we do better? (i.e.
What are we going to do now?).   
2.2 The Strategic Self-Evaluation Framework is supported by the same five non-negotiable
standards as the other strategic Frameworks and, as such, the self-evaluation of the
Audit and Scrutiny Panel has been developed so that it is: 
• Aligned - to The Plan for North Lanarkshire so that improvement actions contribute
to the achievement of the council’s long-term vision.
• Consistent - so there is a clear understanding of the purpose and benefits of the
self-evaluation exercise.  
• Transparent - so that progress made against the implementation of the
improvement actions is widely reported, understood, and acted upon to support
the council’s governance arrangements. 
• In context - so that the self-evaluation exercise is tailored to the function being
evaluated and designed within the context of that operating environment.  
• Balanced - to ensure the self-evaluation exercise undertaken is proportionate to
the resources expended, outcomes expected, the scale of the function being
evaluated, and the associated risks.  The outputs must tell a balanced narrative
that identifies aspects of good practice as well as areas for improvement. 
2.3 Within the context noted above and in section 1 of this report - and in conjunction with
the Chief Officer (Audit and Risk) in relation to the Panel’s audit function and the Chief
Officer (Business and Digital) in relation to the Panel’s scrutiny function -  the approach
to the self-evaluation of the Audit and Scrutiny Panel is set out in paragraphs 2.3.1 to
2.3.3 below. 
2.3.1 Evaluation Framework 
In terms of establishing an evaluation framework for each self-evaluation exercise, the
Strategic Self-Evaluation Framework recommends that this should best reflect the
function being assessed and the context and operating environment of that function. 
The framework used should also be that which is most appropriate to delivering the
desired outcomes. 
The evaluation framework used for the self-evaluation of the Audit and Scrutiny Panel
is therefore based on CIPFAs Position Statement: Audit Committees in Local
Authorities (2018) and incorporates the key principles set out in the supporting Audit
Committees Practical Guidance for Local Authorities (2018) document.  These are
considered to be the essential factors in developing effective audit aspects for such a
committee. 
From a scrutiny perspective, the Audit and Scrutiny Panel has a key role to play in
terms of ensuring the council can demonstrate Best Value through the existence of
robust arrangements for performance reporting and scrutiny.  As such relevant
Page 162 of 240

Page 167

statements have also been incorporated into the evaluation framework from the Best
Value Statutory Guidance (2020). 
The evaluation framework for the self-evaluation of the Audit and Scrutiny Panel is
attached in Appendix 3.  This covers four themes: 
A. Panel purpose and governance.
B. Functions of the Panel.
C. Membership and support.
D. Effectiveness of the Panel. 
Within each theme there are two sections (as set out in Appendix 3): 
• Context and evidence base.  Context is an important first step in a self-evaluation
exercise in order to ensure a clear understanding of the operating environment of
the function being evaluated and ensure clarity in terms of the scope and
boundaries of the exercise.  Initial desktop work to gather evidence helps to ensure
that the results from the self-evaluation exercise can be cross checked from
multiple sources in order to increase the reliability and validity of the findings, as
well as help to ensure a wider understanding of complex issues and facilitate the
identification of more complete and fully informed areas for improvement.
• This section has been prepopulated with the facts regarding the operation of the
Panel in line with both the council’s decision making and committee arrangements
as set out in the approved Standing Orders and Scheme of Delegation.  This
section also reflects updates in terms of the council’s corporate governance
arrangements which have been set out in various reports to the Panel over the
course of 2022 and 2023. 
• 25 good practice questions.  All Elected Members who sit on the Audit and
Scrutiny Panel will be provided with the opportunity to respond to each of the 25
questions listed in Appendix 3 through an online survey.  There will also be an
opportunity to highlight what works well and to make any suggestions for
improvement.
• Should a 1:1 discussion be required to support Panel Members to complete the
online survey, this can be arranged.  To organise this please contact the Chief
Officer (Legal and Democratic) in the first instance. 
2.3.2 Process and Timetable 
Action Responsibility Timescale
1.
Initial report to the Audit and
Scrutiny Panel providing an
overview of the forthcoming
self-evaluation exercise.
Chief Officer (Legal and Democratic)
Champion for the self-evaluation of
the Audit and Scrutiny Panel
04/09/23
2.
Online survey issued to all
Elected Members who sit on
the Audit and Scrutiny Panel.
Chief Officer (Legal and Democratic) 05/09/23
3. Online survey to be completed. All Elected Members on the Audit and
Scrutiny Panel By 19/09/23
4.
Analysis of survey results and
collation of report comprising
the outcomes and improvement
plan arising from the self-
evaluation.
Chief Officer (Legal and Democratic)
/ Strategy and Performance Manager  By 26/09/23
5.
Presentation of outcome report
and improvement plan to the
Audit and Scrutiny Panel.
Chief Officer (Legal and Democratic)
Conveners meeting:
24/10/23
Panel meeting:
Page 163 of 240

Page 168

16/11/23
6.
Discuss outcome report and
agree implementation of
improvement plan.
All Elected Members on the Audit and
Scrutiny Panel
Panel meeting:
16/11/23
7.
Improvement plan remitted to
the Policy and Strategy
Committee as per the Internal
Audit recommendation.
Chief Officer (Legal and Democratic) Committee meeting:
07/12/23 
2.3.3 Improvement plan 
Where the results of the self-evaluation exercise show a high degree of performance 
against the good practice questions, CIPFA consider this to be an indicator that the 
Audit and Scrutiny Panel is soundly based and has in place a knowledgeable 
membership.  As well as informing an improvement plan for the Panel, the self-
evaluation exercise will also be able to be used to support future planning for the
Panel’s work programme, training plan, and annual report.   
Regular updates, reporting on progress in implementing any actions arising from the
self-evaluation exercise which require to be identified in the ensuing improvement plan,
will be added to the Panel’s Scrutiny Work Programme.  This will enable Elected
Members on the Panel to monitor progress and effectiveness of the actions
implemented along with the Panel’s routine activity. 
3. Measures of success 
3.1 Measures of success will be identified in the form of evidence which demonstrates that
the council has effective Audit and Scrutiny Panel arrangements.  Specifically that the
Panel effectively discharges its duty in line with the council’s Scheme of Administration,
that the performance and activities of the Panel is effective in discharging the audit
aspect of its role in line with CIPFAs Audit Committees Practical Guidance for Local
Authorities (2018), and that the performance and activities of the Panel is effective in
discharging the scrutiny aspect of its role in line with ensuring the council can
demonstrate Best Value through the existence of robust arrangements for performance
reporting and scrutiny. 
3.2 Further measures of success will reflect the skills and knowledge of the Elected
Members on the Audit and Scrutiny Panel, and their commitment to ensuring they have
(where appropriate or required) access to relevant training and resources to enhance
their knowledge, skills, capacity, and capabilities in order to effectively undertake their
role on the Panel. 
4. Supporting documentation 
4.1 Appendix 1: CIPFAs Position Statement: Audit Committees in Local Authorities (2018)
Appendix 2: Audit and Scrutiny Panel terms of reference (as per the Scheme of 
Administration, October 2022). 
Appendix 3: Self-Evaluation of the Audit and Scrutiny Panel - Evaluation Framework   
Archie Aitken
Chief Officer (Legal and Democratic)
Page 164 of 240

Page 169

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Page 165 of 240

Page 170

Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Implementation of a self-evaluation of the Audit and Scrutiny Panel contributes to
the mitigation of the risk on the Corporate Risk Register for governance,
leadership, and decision making.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 166 of 240

Page 171

Page 1
CIPFA’s Position Statement: 
Audit Committees in 
Local Authorities and Police
The scope of this Position Statement includes all principal local authorities in the UK,
the audit committees for PCCs and chief constables in England and Wales, and the audit
committees of fire and rescue authorities.
1 Audit committees are a key component of an authority’s governance framework. Their
function is to provide an independent and high-level resource to support good governance
and strong public financial management.
2 The purpose of an audit committee is to provide to those charged with governance
independent assurance on the adequacy of the risk management framework, the internal
control environment and the integrity of the financial reporting and governance processes. By
overseeing both internal and external audit it makes an important contribution to ensuring
that effective assurance arrangements are in place.
3 Authorities and police audit committees should adopt a model that establishes the
committee as independent and effective. The committee should:
„ act as the principal non-executive, advisory function supporting those charged with
governance
„ in local authorities, be independent of both the executive and the scrutiny functions and
include an independent member where not already required to do so by legislation
„ in police bodies, be independent of the executive or operational responsibilities of the
PCC or chief constable
„ have clear rights of access to other committees/functions, for example, scrutiny and
service committees, corporate risk management boards and other strategic groups
„ be directly accountable to the authority’s governing body or the PCC and chief constable.
4 The core functions of an audit committee are to:
„ be satisfied that the authority’s assurance statements, including the annual governance
statement, properly reflect the risk environment and any actions required to improve it,
and demonstrate how governance supports the achievement of the authority’s objectives 
„ in relation to the authority’s internal audit functions:
– oversee its independence, objectivity, performance and professionalism
Appendix 1
Page 167 of 240

Page 172

AUDIT COMMITTEES: PRACTICAL GUIDANCE FOR LOCAL AUTHORITIES AND POLICE \ 2018 EDITION
Page 2
– support the effectiveness of the internal audit process
– promote the effective use of internal audit within the assurance framework
„ consider the effectiveness of the authority’s risk management arrangements and the
control environment, reviewing the risk profile of the organisation and assurances that
action is being taken on risk-related issues, including partnerships and collaborations
with other organisations
„ monitor the effectiveness of the control environment, including arrangements for
ensuring value for money, supporting standards and ethics and for managing the
authority’s exposure to the risks of fraud and corruption
„ consider the reports and recommendations of external audit and inspection agencies and
their implications for governance, risk management or control
„ support effective relationships between external audit and internal audit, inspection
agencies and other relevant bodies, and encourage the active promotion of the value of
the audit process.
„ review the financial statements, external auditor’s opinion and reports to members, and
monitor management action in response to the issues raised by external audit.
5 An audit committee can also support its authority by undertaking a wider role in other areas
including:
„ considering governance, risk or control matters at the request of other committees or
statutory officers
„ working with local standards and ethics committees to support ethical values
„ reviewing and monitoring treasury management arrangements in accordance with
Treasury Management in the Public Services: Code of Practice and Cross-Sectoral
Guidance Notes (CIPFA, 2017) 
„ providing oversight of other public reports, such as the annual report. 
6  Good audit committees are characterised by:
„ a membership that is balanced, objective, independent of mind, knowledgeable and
properly trained to fulfil their role. The political balance of a formal committee of a
council will reflect the political balance of the council, however, it is important to achieve
the right mix of apolitical expertise
„ a membership that is supportive of good governance principles and their practical
application towards the achievement of organisational objectives
„ a strong independently minded chair – displaying a depth of knowledge, skills and
interest. There are many personal qualities needed to be an effective chair, but key to
these are:
– promoting apolitical open discussion
– managing meetings to cover all business and encouraging a candid approach from
all participants
– an interest in and knowledge of financial and risk management, audit, accounting
concepts and standards, and the regulatory regime
„ unbiased attitudes – treating auditors, the executive and management fairlyPage 168 of 240

Page 173

CIPFA’S POSITION STATEMENT:  AUDIT COMMITTEES IN  LOCAL AUTHORITIES AND POLICE
Page 3
„ the ability to challenge the executive and senior managers when required.
7 To discharge its responsibilities effectively the committee should:
„ meet regularly – at least four times a year, and have a clear policy on those items to be
considered in private and those to be considered in public
„ be able to meet privately and separately with the external auditor and with the head of
internal audit
„ include, as regular attendees, the CFO(s), the chief executive, the head of internal audit
and the appointed external auditor. Other attendees may include the monitoring officer
(for standards issues) and the head of resources (where such a post exists). These officers
should also be able to access the committee, or the chair, as required
„ have the right to call any other officers or agencies of the authority as required, while
recognising the independence of the chief constable in relation to operational policing
matters
„ report regularly on its work to those charged with governance, and at least annually
report an assessment of their performance. An annual public report should demonstrate
how the committee has discharged its responsibilities.
Additional guidance to support those acting as audit committee members in local authorities
can be found in CIPFA’s publication Audit Committees: Practical Guidance for Local
Authorities and Police (2018), available from www.cipfa.org.uk/publications
Page 169 of 240

Page 174

Appendix 2
AUDIT AND SCRUTINY PANEL 
(1) Statement of Purpose 
The Audit and Scrutiny Panel is a key component of the Council’s corporate
governance arrangements. The purpose of the Audit and Scrutiny Panel is to provide
independent assurance to the Council and those charged with governance on the
adequacy of the Council’s risk management framework and internal control
environment. It provides independent review of the Council’s governance, risk
management, performance and control frameworks and oversees the financial
reporting and annual governance processes. It oversees the Council’s internal and
external audit arrangements, helping to ensure efficient and effective assurance
arrangements are in place. It also undertakes the scrutiny function within the
Council’s governance framework and will establish short life task group reviews, as
required, to undertake in-depth examination of particular areas of policy and/or
service delivery with a view to making recommendations for improvement. 
(2) Governance, Risk and Control 
The Audit and Scrutiny Panel’s remit in relation to governance, risk and control is:- 
• to review the Council’s corporate governance arrangements against relevant
good practice guidance and consider annual governance reports and
assurances; 
• to review the Annual Governance Statement prior to approval and consider
whether it properly reflects the risk environment and supporting assurances,
taking into account Internal Audit’s opinion on the overall adequacy and
effectiveness of the Council’s framework of governance, risk management and
control; 
• to consider the Council’s arrangements to secure value for money and review
assurances and assessments on the effectiveness of these arrangements
including in relation to the Council’s ALEOs; 
• to monitor the effective development and operation of risk management in the
Council and its ALEOs, including monitoring progress in addressing risk-related
issues reported to the Panel; 
• to consider reports on the effectiveness of internal controls and monitor the
implementation of agreed actions, and 
• to review the assessment of fraud risks and potential harm to the Council from
fraud and corruption by monitoring the Council’s counter-fraud strategy, actions
and resources. 
(3) Internal Audit 
The Audit and Scrutiny Panel’s remit in relation to Internal Audit is:- 
• to approve the Internal Audit Charter; 
• to approve the risk-based Internal Audit Plan, including Internal Audit’s resource
requirements; 
• to approve significant interim changes to the risk-based Internal Audit Plan and
Page 170 of 240

Page 175

resource requirements; 
• to make appropriate enquiries of both management and the Audit and Risk
Manager to determine if there are any inappropriate scope or resource
limitations impacting on the work of Internal Audit; 
• to consider reports from the Audit and Risk Manager on Internal Audit’s activity
and performance during the year. These will include:- 
- updates on the work of Internal Audit, including key findings, issues of
concern and action in hand as a result of Internal Audit work;
- regular Internal Audit Progress Reports (including summaries of substantive
Internal Audit reports, as requested);
- periodic reports on the results of the Quality Assurance and Improvement
Programme, and
- reports on instances where the internal audit function does not conform to
the Public Sector Internal Audit Standards and Local Government Application
Note, considering whether the non-conformance is significant enough that it
must be included in the Annual Governance Statement; 
• to consider the Audit and Risk Manager’s Annual Report, including:- 
- the statement of the level of conformance with the Public Sector Internal
Audit Standards and Local Government Application Note and the results of
the Quality Assurance and Improvement Programme that supports the
statement – these will indicate the reliability of the conclusions of Internal
Audit, and
- the opinion on the overall adequacy and effectiveness of the Council’s
framework of governance, risk management and control, together with the
summary of the work supporting the opinion - these will assist the Panel in
reviewing the Council’s Annual Governance Statement; 
• to receive reports outlining the action taken where the Audit and Risk Manager
has concluded that management has accepted a level of risk that may be
unacceptable to the Council or there are concerns about progress with the
implementation of agreed actions; 
• to contribute to the Quality Assurance and Improvement Programme and in
particular, to the external quality assessment of Internal Audit that takes place
at least once every five years, and 
• to support the development of effective communication with the Audit and Risk
Manager. 
(4) External Audit 
The Audit and Scrutiny Panel’s remit in relation to External Audit is:- 
• to consider the External Auditor’s Annual Plan and all relevant reports issued to
those charged with governance; 
• to comment on the scope and depth of external audit work and to ensure it
gives value for money, and 
• to advise, and make recommendations as appropriate, on the effectiveness of
Page 171 of 240

Page 176

relationships between External Audit and Internal Audit and other inspection
agencies or relevant bodies. 
(5) Financial Reporting 
The Audit and Scrutiny Panel’s remit in relation to financial reporting is:- 
• to review the Annual Statement of Accounts. Specifically, to consider whether
appropriate accounting policies have been followed and whether there are
concerns arising from the financial statements, or from the audit, that need to be
brought to the attention of the Council, and 
• to consider the External Auditor’s report to those charged with governance on
issues arising from the audit of the accounts. 
(6) Scrutiny
The Audit and Scrutiny Panel’s remit in relation to the challenge and scrutiny function
is:- 
• to review and monitor the performance of the council in delivering upon its
priorities, outcomes, programme of work and targets in the Council plan,
specifically performance (for example in improving services and outcomes and
in demonstrating Best Value); 
• to review performance to assess whether intended policy outcomes have been
achieved; 
• to consider the Council's performance, improvement, and governance
arrangements to ensure that approaches continues to facilitate effective and
efficient delivery of planned services and outcomes and the Council's vision,
and 
• to commission independent short life task group reviews (based on evidence),
and carry out reviews recommended from service committees, to enable in-
depth scrutiny of policy, practices, and performance where the challenge and
scrutiny function can make an impact or add value. 
(7) Accountability Arrangements
The Audit and Scrutiny Panel’s remit in relation to accountability arrangements is:- 
• to report to the Council’s Policy and Strategy Committee on the Panel’s
findings, conclusions and recommendations concerning:- 
- the adequacy and effectiveness of the Council’s governance, risk
management and internal control frameworks;
- financial reporting arrangements;
- internal and external audit arrangements;
- the performance of the council in delivering upon its priorities, and
- the adequacy and effectiveness of the Council's performance and
improvement arrangements, and 
• to report to the Council’s Policy and Strategy Committee on a regular basis on
the Panel’s performance in relation to its Terms of Reference and the
effectiveness of the Panel in meeting its purpose.
Page 172 of 240

Page 177

Appendix 3 
Self-Evaluation of the Audit and Scrutiny Panel
Evaluation framework 
This high-level evaluation framework incorporates the key principles set out in CIPFAs Position Statement: Audit Committees in Local Authorities
(2018) and the supporting Audit Committees Practical Guidance for Local Authorities (2018) document.  These are considered to be the essential
factors in developing effective audit aspects for such a committee. 
From a scrutiny perspective, the Audit and Scrutiny Panel has a key role to play in terms of ensuring the council can demonstrate Best Value through
the existence of robust arrangements for performance reporting and scrutiny.  As such relevant statements have also been incorporated into this
evaluation framework from the Best Value Statutory Guidance (2020). 
Theme A. Panel purpose and governance
Context 
and 
evidence base
• Local authorities are corporate bodies created by statute and must make corporate decisions. Legislation allows local authorities to delegate
most decision making to committees, sub-committees, or officers. This means that committees only operate within the remits given to them by
their council. The council has delegated certain matters to committees, sub-committees and officers, and the Standing Orders set out the rules
which apply to the running and operation of council and its committee meetings.  The latest version of the Standing Orders (December 2022) is
available on InsideNL: Corporate Governance.
• The Scheme of Administration provides the details and different functions of committees and other groups of each council and the delegation
of authority to carry out the functions of the council.  It sets out the terms of reference for committees, sub-committees, and panels of the
council. At its meeting on 6th October 2022, the Council approved new governance arrangements and the Scheme of Administration:
https://mars.northlanarkshire.gov.uk/egenda/images/att98939.pdf.
• The Audit and Scrutiny Panel was established in its current form in 2017, with Audit / Governance and Scrutiny being separate committees
prior to that.  The current Audit and Scrutiny Panel has two discrete functions - Audit and Scrutiny, with corporate governance a key aspect
within both of these functions.
• As per the Scheme of Administration approved at the Council meeting in October 2022, the Audit and Scrutiny Panel is a standing committee
of North Lanarkshire Council and a Sub-Committee of the Policy and Strategy Committee.  
• The Audit and Scrutiny Panel’s remit in relation to accountability arrangements is to report to the council’s Policy and Strategy Committee on
the Panel’s findings, conclusions, and recommendations concerning the adequacy and effectiveness of the council’s governance, risk
management and internal control frameworks, financial reporting arrangements, internal and external audit arrangements, the performance of
the council in delivering upon its priorities, and the adequacy and effectiveness of the council's performance and improvement arrangements. 
It is also required to report to the Policy and Strategy Committee on a regular basis on the Panel’s performance in relation to its Terms of
Reference and the effectiveness of the Panel in meeting its purpose.
• The Terms of Reference for the Audit and Scrutiny Panel are set out in the Scheme of Administration.  Each year the Strategic Governance
Framework provides the evidence for production of the Annual Governance Statement to demonstrate that the purpose, activities, and
functions of the council’s Audit and Scrutiny Panel reflect the standards set out in CIPFAs Position Statement: Audit Committees in Local
Authorities (2018).
Good practice
questions
1. Is the role and purpose of the Audit and Scrutiny Panel understood and accepted across the
council? 
2. Does the Panel provide support to the council in meeting the requirements of good governance? 
3. Are the arrangements to hold the Panel to account for its performance operating satisfactorily?
Response
required
Additional commentary
requested
• Yes • What works well?
Page 173 of 240

Page 178

4. Are Members of the Panel committed to training and personal development to update and
enhance their knowledge, skills, capacity, and capabilities (where appropriate or required) to
deliver Best Value and perform their role on the Panel?
• No
• Partially
• Don’t know
• Suggestions for
improvement?
Theme B. Functions of the Panel
Context 
and 
evidence base
• The Terms of Reference for the Audit and Scrutiny Panel explicitly address the following areas from CIPFAs Position Statement: Audit
Committees in Local Authorities (2018), i.e. good governance, assurance framework, internal audit, external audit, financial reporting, risk
management, value for money, and counter fraud and corruption.
• Standing agenda item number 1 on all agendas for Council and Committee meetings is Declarations of Interest in terms of the Ethical
Standards in Public Life Etc. (Scotland) Act 2000.  Any declarations made are recorded in the minutes.
• Good governance enables the council to effectively pursue the ambition set out in The Plan for North Lanarkshire within appropriate controls
and the management of risk.  It is also central to ensuring effective scrutiny and delivery of statutory Best Value obligations.  The changes in
the national approach to auditing Best Value were reported to the Audit and Scrutiny Panel in February 2023:
https://mars.northlanarkshire.gov.uk/egenda/images/att99864.pdf.  This report also set out the role of Panel members in this respect.  These
changes move the audit of Best Value from once every five years to an annual occurrence that is undertaken as part of the external auditors
Annual Audit Report (AAR) process.  
• Reflecting the principles in the national Delivering Good Governance in Local Government: Framework, the council’s local code of governance
is set out in the Strategic Governance Framework which was initially approved in February 2020 and subsequently refreshed and approved by
the Audit and Scrutiny Panel annually thereafter; the most recent in June 2023:
https://mars.northlanarkshire.gov.uk/egenda/images/att100886.pdf. 
Good practice
questions
5. Has the Panel maintained its remit as set out in the Terms of Reference in the approved
Scheme of Administration?
6. Is an evaluation undertaken to assess whether the Panel is fulfilling its terms of reference and
that adequate consideration has been given to all core areas in the terms of reference?
7. Where coverage of core areas in the terms of reference has been found to be limited, are plans
in place to address this?
8. Has the Audit and Scrutiny Panel considered the wider areas identified in CIPFAs Position
Statement: Audit Committees in Local Authorities (2018) and whether it would be appropriate for
the Panel to undertake them?
9. Is the Panel’s role clear in relation to ensuring the council can demonstrate Best Value through
the existence of robust arrangements for performance reporting and scrutiny?
10. Do the scrutiny structures in the council support Members in reviewing and challenging
performance?
Response
required
Additional commentary
requested
• Yes
• No
• Partially
• Don’t know
• What works well?
• Suggestions for
improvement?
Theme C. Membership and support
Context 
and 
evidence base
• 11 Elected Members sit on the Audit and Scrutiny Panel.  Membership is in line with appointments to all committees and other bodies and
these places are decided upon at a meeting of the Council.
• Panel meetings are held quarterly in line with the council’s arrangements for committee meetings which support the implementation of the
Scheme of Administration.  At its meeting on 6th October 2022, the Council approved new governance arrangements - including the
membership of committees, sub-committees, panels, and outside bodies and the timetable of meetings for 2022-27:
https://mars.northlanarkshire.gov.uk/egenda/public/kab190.pl?cmte=COU&meet=227 
Page 174 of 240

Page 179

• The Convener and Vice Convener for all council’s committees, sub-committees and panels were approved at the Council meeting in August
2022 https://mars.northlanarkshire.gov.uk/egenda/public/kab190.pl?cmte=COU&meet=230. The latest membership changes to the Audit and
Scrutiny Panel were approved at the Council meeting in June 2023: https://mars.northlanarkshire.gov.uk/egenda/images/att101005.pdf. 
• The Committee Services team within Legal and Democratic provide secretariat and administrative support to all of the council’s committees,
including the Audit and Scrutiny Panel.
• The Chief Officer (Audit and Risk) supports the Panel on matters relating to internal audit, external audit, and risk management.  
• The Chief Officer (Business and Digital) supports the Panel on matters relating to scrutiny, Best Value, and Arm’s Length External
Organisation (ALEO) assurance reporting.  Matters in relation to corporate governance can be covered by either of these two Chief Officers,
depending on the particular subject matter. 
• The Chief Officer (Finance) supports the Panel on matters relating to financial reporting.  
• Any Chief Officer can be called in by the Panel to provide further support, where appropriate, on service specific queries matters.
• LearnNL provides an online portal for all Elected Members training and development needs, as well as an induction programme for new
Elected Members: https://learnnl.learningpool.com/login/index.php
Good practice
questions
11. Does the Convener of the Panel have appropriate knowledge and skills?
12. Do Members of the Panel have appropriate knowledge and skills?
13. Do Members of the Panel receive sufficient support to perform their role on the Panel?
14. Are arrangements in place to support the Panel with briefings and training?
15. Does the Panel have good working relations with key people and organisations, including
external audit, internal audit, and the chief financial officer?
16. Is the secretariat and administrative support provided to the Panel adequate?
17. Does the Panel have access to clear, timely, and sufficiently detailed information that allows
them to carry out their governance and scrutiny role?
Response
required
Additional commentary
requested
• Yes
• No
• Partially
• Don’t know
• What works well?
• Suggestions for
improvement?
Theme D. Effectiveness of the Panel
Context 
and 
evidence base
• Internal Audit undertakes a programme of work which is approved by the Audit and Scrutiny Panel on an annual basis; this is based on the
Internal Audit Annual Plan. This plan is risk based and is periodically updated to reflect evolving issues and changes.  The most recent was
approved in May 2023: https://mars.northlanarkshire.gov.uk/egenda/images/att100639.pdf. 
• A log is maintained of Audit and Risk related items to allow Elected Members to track implementation of outstanding requests and
recommendations made by the Panel; log as at May 2023: https://mars.northlanarkshire.gov.uk/egenda/images/att100380.pdf. 
• An update to the assessment and prioritisation process (previously approved in 2018 to establish a work programme for the scrutiny function
of the Panel) was reported to the Panel in September 2022: https://mars.northlanarkshire.gov.uk/egenda/images/att98534.pdf. Through this
process members of the Panel are able to submit items, functions, or activities requiring scrutiny which are then assessed and prioritised in
line with the approved framework.  This process was further updated in September 2022 to ensure scrutiny activity is framed within the context
of The Plan for North Lanarkshire. 
• A further report in February 2023 combined the previous twofold approach to the scrutiny function of the Panel - which comprises (1) items,
functions, or activities requiring scrutiny identified and submitted by Panel members, and (2) the presentation of information and reports
aligned to the long-term vision set out in The Plan for North Lanarkshire and its supporting strategic frameworks - into the one composite
Scrutiny Work Programme.  This composite programme listed all scrutiny related reports scheduled to be presented to the Panel during each
cycle of 2023/24: https://mars.northlanarkshire.gov.uk/egenda/images/att99865.pdf. 
Good practice
questions
18. Are meetings effective with a good level of discussion and engagement from all Panel Response
required
Additional commentary
requested
Page 175 of 240

Page 180

members?
19. Does the Panel engage with a wide range of leaders and managers, including discussion of
audit findings, risks, and action plans with the responsible officers?
20. Does the Panel make recommendations for the improvement of governance, risk, control, and
performance and are these acted on?
21. Has the Panel obtained feedback on its performance from those interacting with the Panel or
relying on its work?
22. Has the Panel evaluated whether and how it is adding value to the organisation?
23. Does the Panel have an action plan to improve any areas of weakness?
24. Does the Panel publish an annual report to account for its performance and explain its work?
25. Is the Panel assured that its scrutiny of council performance adds value to the scrutiny activity
which already takes place at Service Committee level and does not duplicate efforts?
• Yes
• No
• Partially
• Don’t know
• What works well?
• Suggestions for
improvement? 
Page 176 of 240

Page 181

North Lanarkshire Council
Report
Audit and Scrutiny Panel 
Does this report require to be approved? ☒ Yes   ☐ No
Ref KH/SL Date 04/09/23 
Scrutiny Work Programme (mid-year update) 
From  Katrina Hassell, Chief Officer (Business and Digital)  
E-mail HassellK@northlan.gov.uk Telephone 07903 096 121 
Executive Summary
This report follows on from the report to the Panel in September 2022 which outlined the
process by which Members of the Audit and Scrutiny Panel are able to submit items,
functions, or activities which potentially require to undergo scrutiny.  To support this an
Assessment and Prioritisation Process was also set out to allow for the relative merits of
each issue brought forward by Panel Members to be assessed objectively, thus making
the approach to determining whether an issue is appropriate for inclusion in the Scrutiny
Work Programme clear and transparent.  It also allows for issues to be prioritised if there
were potentially competing matters presented for scrutiny. 
A subsequent report in February 2023 set out the Work Programme for the Scrutiny
function of the Audit and Scrutiny Panel.  In doing so it combined all aspects of the Panel’s
scrutiny function into a composite programme which listed all related reports scheduled to
be presented to the Panel during each cycle of 2023/24. 
This composite approach aims to ensure the council fulfils both its statutory Best Value
duty (with scrutiny structures that support Elected Members in reviewing and challenging
performance) and the principles of good corporate governance (in line with the Panels’
remit set out in the Scheme of Administration to provide an “independent review of the
council's governance, risk management, performance, and control frameworks, and
oversee the financial reporting and annual governance processes”).  It also aims to ensure
all scrutiny activity remains framed within the context of The Plan for North Lanarkshire
and is focused on improving local public services and improving local outcomes. 
Recommendations
It is recommended that the Audit and Scrutiny Panel: 
(1) Are aware of the mid-year update to the composite Scrutiny Work Programme and
reporting timetable for the scrutiny function of the Audit and Scrutiny Panel, as set out
in Appendix 3,
(2) Continue to endorse the role of Panel Members in identifying potential issues for
inclusion in the Scrutiny Work Programme in line with the Assessment and
Prioritisation Process (in Appendix 2) and the overall approach (in Appendix 1), and
(3) Continue to carry out their scrutiny role in reviewing and challenging performance to
ensure the council fulfils its statutory Best Value duty.
Item 12
Page 177 of 240

Page 182

1. Background 
1.1  Audit and Scrutiny Panel Members will recall the report in September 2022 which set
out the updated Assessment and Prioritisation Process.  This report focused on the
process through which Members of the Audit and Scrutiny Panel are able to identify
and submit specific items, functions, or activities which potentially require to undergo
scrutiny. 
1.2 A further report in February 2023 set out the Scrutiny Work Programme for the Panel,
listing all scrutiny related reports scheduled to be presented to the Audit and Scrutiny
Panel in each cycle of 2023/24.  This composite programme brought together the
Panel’s approach to scrutiny which had traditionally been twofold: 
(1) Items, functions, or activities requiring scrutiny identified and submitted by Panel
Members (in line with the process approved by the Panel in August 2018 and
subsequently updated in September 2022).
(2) Presentation of information and reports aligned to the long-term vision set out in
The Plan for North Lanarkshire and its supporting strategic frameworks (as per the
process reported to the Panel in November 2019). 
1.3 This approach supports the Audit and Scrutiny Panel to fulfil its remit (in line with the
Scheme of Administration) to provide an “independent review of the council's
governance, risk management, performance, and control frameworks, and oversee the
financial reporting and annual governance processes.” 
1.4 It also contributes to discharging the scrutiny function in line with the Panel’s specific
remit to:
• Review and monitor the performance of the council in delivering upon its priorities,
outcomes, programme of work, and targets in the council plan; specifically
performance in improving local public services and local outcomes and in
demonstrating Best Value.
• Review performance to assess whether intended policy outcomes have been
achieved.
• Consider the council's performance, improvement, and governance arrangements
to ensure that approaches continue to facilitate effective and efficient delivery of
planned services and outcomes and the council’s vision. 
1.5 Since the Scrutiny Work Programme was approved in February 2023, various items
have been scrutinised and Panel Members have submitted requests for other specific
items, functions, or activities to be considered for inclusion in the Programme in line
with the approved Assessment and Prioritisation Process. This report therefore
provides a mid-year update to the Scrutiny Work Programme to allow Elected Members
to track requests made for scrutiny, and assess progress made in submitting reports to
the Panel in line with the reporting timetable. It also provides a log of scrutiny related
requests, and recommendations made by the Panel, to support ongoing monitoring and
management.  
2. Scrutiny Work Programme 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Page 178 of 240

Page 183

Assessment and Prioritisation Process 
2.1 The Scrutiny Work Programme for the scrutiny function of the Audit and Scrutiny Panel
is founded on items submitted for consideration being evidence based.  This is
essential in order to ensure a fully informed assessment and prioritisation process. 
2.2 As such, a set of principles were agreed in 2018 which were to be used to assess and
prioritise items to be included in the Scrutiny Work Programme.  To ensure scrutiny
continues to support delivery of the programme of work for The Plan for North
Lanarkshire, and focuses on improving local public services and local outcomes, these
were further reviewed in September 2022.  The current set of principles is listed below: 
1. Is the issue an area of concern for a wide range of service users, communities, or
stakeholders that has been identified by numerous sources and is supported by a
substantial bank of evidence?
2. Is the issue strategically significant, i.e. would improvement in this area have a
positive impact on the delivery of one or more of the five priorities in The Plan for
North Lanarkshire.  The five priorities aim to:
• Improve economic opportunities and outcomes.
• Support all children and young people to realise their full potential.
• Improve the health and wellbeing of communities.
• Enhance participation, capacity, and empowerment across communities.
• Improve North Lanarkshire’s resource base.
3. Can scrutiny add value? Is performance, service delivery, or quality likely to
improve as a result of scrutiny?
4. Will scrutiny of the issue support improved delivery of the Programme of Work or
improved delivery of any of the supporting strategies, policies, or plans in the
Strategic Policy Framework?
5. Does the issue pose a significant risk to the council?
6. Has the issue already undergone scrutiny, or review activity, within a recent
timeframe?
7. Will scrutiny be duplicating other review work already underway, or planned, across
the council?  If so, does the scrutiny process align to the scope of the other review
work and will it be able to support the identification of mutually beneficial
recommendations for improvements?
8. Is the proposed scrutiny activity timely and can the scrutiny activity be completed
within a reasonable timeframe? 
Approach to Scrutiny led by Members of the Panel 
2.3 The Assessment and Prioritisation Process - informed by the principles set out in
paragraph 2.2 above - is set out in Appendix 2.  This process is applied when assessing
and prioritising each proposed area of activity or issue put forward by Panel Members. 
For completeness in terms of the overall approach to scrutiny led by Members of the
Panel, the arrangements in place that sit alongside the Assessment and Prioritisation
Process are outlined in Appendix 1. 
2.4 For added context a wide range of information already exists to complement the
scrutiny process, this includes: 
• Performance indicators from the Strategic Performance Framework.
• Information on the volume, nature, and outcome of complaints. 
• Benchmarking results and comparisons with other councils, where available and
aligned to themes linked to the five priorities in The Plan for North Lanarkshire (as
per the approach established by the Panel in September 2021).
Page 179 of 240

Page 184

• Demographics and future projections, e.g. for population or households. 
• Policies in place, or under development in line with the Strategic Policy Framework
review programme.
• Improvements already identified and implemented arising from the Strategic Self-
Evaluation Framework review programme.
• Elements or mechanisms from the Strategic Governance Framework review
programme. 
Timetable of reports to future Panel meetings 
2.5 While the information set out in paragraph 2.4 above supports (a) the items, functions,
or activities requiring scrutiny identified and submitted by Panel Members, it also forms
the basis for (b) the presentation of information and reports aligned to long-term vision
set out in The Plan for North Lanarkshire and its supporting strategic frameworks.  As
such, both of these areas are captured in the timetable in Appendix 3. 
Type of scrutiny review 
2.6 Appendix 3 includes the specific areas of scrutiny identified by Panel Members as
requiring to undergo a spotlight review.  Members will recall the types of scrutiny review
which can be undertaken were set out in the report in November 2022.  To ensure the
most effective approach to scrutiny, reviews can take one of three formats: 
• Spotlight - short, sharp focused scrutiny activity, which could form one agenda
item for a Panel meeting.
• In-depth - which can be undertaken by all Panel Members or, if required, a smaller
subgroup. This would require a clear scope to be developed along with a timetable
for the work to be undertaken. The work of any subgroup would require a report,
with recommendations, to be submitted back to the full Audit and Scrutiny Panel
for consideration and approval.
• Focus - presentation to Panel Members to share information and raise awareness
or increase knowledge of a particularly complex area of activity or issue. 
Next steps 
2.7 The composite Scrutiny Work Programme in Appendix 3 will be kept up to date and an
update provided to the Panel in cycles 1 and 3 each year.  Any new items, functions,
or activities requiring scrutiny will be added to the programme as they are identified,
scoped (where additional information is needed to help understand the matter being
put forward) and then reviewed through the Assessment and Prioritisation Process.   
3. Measures of success 
3.1 The key measure of success is the Audit and Scrutiny Panel discharging its scrutiny
duty to identify specific areas requiring improvement which are aligned to The Plan for
North Lanarkshire and will have a positive impact on the council’s ability to deliver the
long-term vision and improve local services and outcomes. 
4. Supporting documentation 
4.1 Appendix 1 -  Approach to Scrutiny led by Members of the Panel 
Appendix 2 - Assessment and Prioritisation Process 
Appendix 3 - Composite Scrutiny Work Programme with timetable of reports to 
Panel meetings - 2023 to 2024 (as at July 2023) 
Page 180 of 240

Page 185

Katrina Hassell
Chief Officer (Business and Digital) 
5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The Local Government Act 1992 established the role of the Statutory Direction to
direct the “publication of information as to standards of performance”.  
The Local Government in Scotland Act 2003 introduced the duty of Best Value; this
requires that councils “make arrangements to secure continuous improvement in
performance”.  
5.5 Data protection impact
Page 181 of 240

Page 186

Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
The Scrutiny Work Programme supports an efficient approach to the scrutiny of
performance by the Audit and Scrutiny Panel (in line with their terms of reference
as per the Scheme of Administration) and contributes to the mitigation of the risk
on the Corporate Risk Register for governance, leadership, and decision making.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact
Page 182 of 240

Page 187

Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 183 of 240

Page 188

Panel
Member led
Scrutiny
Panel
Scrutiny
Activity
Assessment
and
Prioritisation
Process
(see Appendix 2)
• Elected Members on the Audit and Scrutiny
Panel can liaise with Business and Digital
Officers when developing their potential items
for scrutiny.
• Once fully developed, Panel Members should
submit their potential items for scrutiny to the
Convener who will then liaise with Business
and Digital Officers regarding the next steps.
In
advance of the
Assessment and
Prioritisation Process
Panel Members to identify potential
items for scrutiny by:
• Identifying the context.
• Presenting the evidence.
• Reviewing the latest performance.
• Carrying out site visits (if required).
• Preparing a list of potential questions
to be addressed.
• Identifying the type of scrutiny
required (i.e. spotlight, in-depth,
focus).
• Business and Digital  Officers
carry out the Assessment and
Prioritisation Process in
conjunction with the Convener.
• At this point, further
engagement may take place with
the Panel Member raising the
item for scrutiny in order to
further scope out specifically
what requires to be scrutinised.
• Once a potential item for
scrutiny has passed muster
through the Assessment and
Prioritisation process, it will be
added to the Scrutiny Work
Programme in line with the
capacity on the agenda for each
meeting and the context around
the issue to be scrutinised.
• Elected Members at Panel meetings.
During
Panel meetings
• Panel Members carry out the
challenge and scrutiny role.
• Agree recommendations.
• Monitor the Scrutiny Work
Programme on a six monthly basis.
• Agree follow ups required based on
either (a) supplementary information
to provide further details / clarity for
an item currently undergoing
scrutiny, or (b) a supplementary
report required to address any
significant matters of concern not
covered in the initial report.
• Scrutiny Work Programme updated and
follow ups actioned by Business and Digital
Officers in conjunction with the Convener
and Chief Officers.
After
Panel meetings
• Update Scrutiny Work Programme.
• Action follow ups actioned by either
(a) obtaining the supplementary
information from the relevant Chief
Officer to provide further details /
clarity for an item which has
undergone scrutiny, or (b) requesting
a supplementary report from the
relevant Chief Officer in order to
address any significant matters of
concern not covered in the initial
report.
What
Who
Scrutiny does:
Add value to what the organisation ultimately
aims to achieve in terms of:
• Improving the performance of local services.
• Improving the performance of outcomes for
local people.
• Demonstrating the council is achieving Best
Value.
• Supporting delivery of The Plan for North
Lanarkshire.
• Improving performance by assessing whether
intended policy outcomes have been achieved.
• Having a clear purpose.
Scrutiny does not:
• Deal with matters that are still subject to legal
or court proceedings.
• Deal with matters which have already been
determined through a legal process.
• Involve political considerations.
• Deal with matters already determined through
a regulatory process (e.g. planning, licensing),
or for which an appeals process already exists.
• Duplicate the work of the council’s Service
Committees.
• Revisit decisions already made by another of
the council’s Committees.
• Involve minor matters or matters involving
individuals.
• Consider live matters that are already subject
to review within the council or by an external
body.
Scrutiny provides:
• An opportunity for
an objective focus
on matters of
performance or
policy that have a
significant impact
on service delivery.
• An opportunity to
challenge matters
of performance or
policy and do a
deep dive into the
facts in order to
drive forward
better performance.
Audit and Scrutiny Panel
Approach to Scrutiny led by Members of the Panel
Assessment
and
Prioritisation
Process
Appendix 1
Page 184 of 240

Page 189

Appendix 2 
Assessment and Prioritisation Process 
Page 185 of 240

Page 190

Appendix 3 
Annual composite scrutiny programme with timetable of reports to future Panel meetings - 2023 to 2024 (as at July 2023)
The following programme will be updated as new items requiring scrutiny are identified, scoped (where required), assessed, and prioritised and pass muster in line with the Assessment and Prioritisation Process. 
Scrutiny items, functions, or activities for
Audit and Scrutiny Panel meetings
Scrutiny of this item, function, or activity aims
to …
Cycle 1
16th Feb
2023
Cycle 2
18th May 
2023 
Mid-year update 
Cycle 3
4th Sept
2023
Cycle 4
16th Nov
2023
Cycle 1
15th Feb
2024
Cycle 2
9th May
2024
Cycle 3
29th Aug
2024
Identified by
Members of the
Audit and Scrutiny
Panel 
Supported businesses. Carry out a spotlight scrutiny review.    ✓ 
• Report at Panel meeting on 18/05/23:
https://mars.northlanarkshire.gov.uk/egenda/im
ages/att100629.pdf 
• Supplementary information requested during
the Panel meeting and circulated afterwards.
• Item complete.      
Laundries in towers. Carry out a spotlight scrutiny review.    ✓ 
• Report at Panel meeting on 18/05/23:
https://mars.northlanarkshire.gov.uk/egenda/im
ages/att100627.pdf 
• Item complete.      
Housing refurbishments. Carry out a spotlight scrutiny review.    ✓  • Report on agenda for Panel meeting on
04/09/23.      
Compulsory purchase
orders. Carry out a spotlight scrutiny review.    ✓  • Report on agenda for Panel meeting on
04/09/23.      
Digital 
Broadband. Carry out a spotlight scrutiny review.     
• The Framework Agreement was awarded to
Commsworld in December 2021; this is for an
initial period of 180 months (15 years). 
Scrutiny of this item has therefore been
scheduled for year three of the contract.   
✓  
Insurance. Carry out a spotlight scrutiny review.      • Added to scrutiny programme July 2023.   ✓   
Scrutiny Work
Programme 
Annual composite
scrutiny programme with
timetable of reports to
future Panel meetings.
Support the Best Value governance and
accountability theme by ensuring the council’s
scrutiny structures support Elected Members in
reviewing and challenging performance.
✓  
• Report at Panel meeting on 16/02/23:
https://mars.northlanarkshire.gov.uk/egenda/im
ages/att99865.pdf 
• Report on agenda for Panel meeting on
04/09/23. 
✓  ✓  ✓
Strategic
Performance
Framework
Annual Performance
Reporting schedule.
Support the Best Value governance and
accountability theme by ensuring the council can
demonstrate the existence of robust
arrangements for scrutiny and performance
reporting. 
Fulfil the Panel’s remit as per the Scheme of
Administration to:
• Review and monitor the performance of the
council in delivering upon its priorities,
outcomes, programme of work, and targets in
the council plan, specifically performance in
improving local services and outcomes and in
demonstrating Best Value.
• Review performance to assess whether
intended policy outcomes have been achieved.
✓  
• Report at Panel meeting on 16/02/23
https://mars.northlanarkshire.gov.uk/egenda/im
ages/att99866.pdf 
✓  
Performance in terms of
improving outcomes (level
1 health check indicators). 
✓ 
• Quarterly performance assurance review
report at Panel meeting on 18/05/23:
https://mars.northlanarkshire.gov.uk/egenda/im
ages/att100418.pdf 
• Quarterly performance assurance review
report on agenda for Panel meeting on
04/09/23. 
✓ ✓ ✓ ✓ ✓
Performance in improving
services (levels 2 and 3
indicators, which includes
Local Government
Benchmarking
Framework (LGBF)
results aligned to the
council’s strategic
priorities. 
✓  
Strategic
Government
Framework
Annual review and refresh
of the Framework and an
update to the review
programme.
Fulfil the Panel’s remit as per the Scheme of
Administration to:
• Consider the council's performance,
improvement, and governance arrangements
to ensure that approaches continue to facilitate
effective and efficient delivery of planned 
✓ 
• Report at Panel meeting on 29/06/23:
https://mars.northlanarkshire.gov.uk/egenda/im
ages/att100886.pdf 
✓ 
Page 186 of 240

Page 191

Scrutiny items, functions, or activities for
Audit and Scrutiny Panel meetings
Scrutiny of this item, function, or activity aims
to …
Cycle 1
16th Feb
2023
Cycle 2
18th May 
2023 
Mid-year update 
Cycle 3
4th Sept
2023
Cycle 4
16th Nov
2023
Cycle 1
15th Feb
2024
Cycle 2
9th May
2024
Cycle 3
29th Aug
2024
services and outcomes and the council's
vision. 
Ensure good governance principles are in place
to enable the council to effectively pursue the
ambition set out in The Plan for North
Lanarkshire within appropriate controls and the
management of risk.  This is also central to
ensuring effective scrutiny and delivery of
statutory Best Value obligations.  This means
ensuring resources are directed in line with
agreed policies, priorities, and project
management procedures, and there is sound
and inclusive decision making and clear
accountability for the use of those resources in
achieving improved outcomes for service users
and communities. 
Note; this is part of the suite of documents that accompanies
the Panel’s consideration of the Unaudited Annual Accounts,
it is therefore scheduled to be presented to the Panel at the
same time, usually at a special meeting in June each year. 
Annual Governance
Statement 
Consider and note the
Annual Governance
Statement each year, and
confirm the inclusion of
the assurance statement
regarding the
management of the risk of
fraud and corruption. 
Fulfil the Panel’s remit as per the Scheme of
Administration to:
• Consider the council's performance,
improvement, and governance arrangements
to ensure that approaches continue to facilitate
effective and efficient delivery of planned
services and outcomes and the council's
vision.
• Review the Annual Governance Statement
prior to approval and consider whether it
properly reflects the risk environment and
supporting assurances, taking into account
Internal Audit’s opinion on the overall
adequacy and effectiveness of the council’s
framework of governance, risk management
and control. 
Fulfil the requirements of the Delivering Good
Governance in Local Government: Framework
(2016) and the Local Authority Accounts
(Scotland) Regulations 2014 by ensuring that: 
• The council conducts a review at least once in
each financial year of the effectiveness of its
system of internal control.
• The findings from the review are considered at
a meeting of a committee whose remit includes
audit or governance functions. 
Note; this is part of the suite of documents that accompanies
the Panel’s consideration of the Unaudited Annual Accounts,
it is therefore scheduled to be presented to the Panel at the
same time, usually at a special meeting in June each year. 
✓ 
• Report at Panel meeting on 29/06/23: 
https://mars.northlanarkshire.gov.uk/egenda/
images/att100728.pdf 
✓ 
Strategic Self-
Evaluation
Framework
Annual review and refresh
of the Framework and an
update to the review
programme.
Fulfil the Panel’s remit as per the Scheme of
Administration to:
• Consider the council's performance,
improvement, and governance arrangements
to ensure that approaches continue to facilitate
effective and efficient delivery of planned
services and outcomes and the council's       
✓  
Page 187 of 240

Page 192

Scrutiny items, functions, or activities for
Audit and Scrutiny Panel meetings
Scrutiny of this item, function, or activity aims
to …
Cycle 1
16th Feb
2023
Cycle 2
18th May 
2023 
Mid-year update 
Cycle 3
4th Sept
2023
Cycle 4
16th Nov
2023
Cycle 1
15th Feb
2024
Cycle 2
9th May
2024
Cycle 3
29th Aug
2024
vision.
Complaints
handling
performance
Annual report on the
council’s performance in
complaints handling. 
Report on the suite of Scottish Public Services
Ombudsman (SPSO) indicators which measures
the council’s performance in implementing the
Local Authority Model Complaints Handling
Procedure. 
Fulfil the requirements of the Delivering Good
Governance in Local Government: Framework
(2016), in particular principle A1.4 Behaving with
integrity and “demonstrating, communicating,
and embedding the standard operating
principles or values through appropriate policies
and processes which are reviewed on a regular
basis to ensure that they are operating
effectively”.      
✓   ✓
Position statement
on the six strategic
frameworks
Annual report to
demonstrate Best Value
in good governance and
effective use of resources
that leads to improving
the functions and
activities the council
undertakes to deliver the
best possible outcomes
and services that improve
the everyday lives of local
people. 
Support the Best Value governance and
accountability theme by ensuring the council can
demonstrate the existence of robust
arrangements for scrutiny and performance
reporting. 
Fulfils the Panel’s purpose as per the Scheme of
Administration to provide “independent review of
the council’s governance, risk management,
performance and control frameworks”. 
Ensure good governance principles are in place
to enable the council to effectively pursue the
ambition set out in The Plan for North
Lanarkshire within appropriate controls and the
management of risk.  This is also central to
ensuring effective scrutiny and delivery of
statutory Best Value obligations.  This means
ensuring resources are directed in line with
agreed policies, priorities, and project
management procedures, and there is sound
and inclusive decision making and clear
accountability for the use of those resources in
achieving improved outcomes for service users
and communities.      
✓   
Project
Management
Framework
independent
strategic oversight
and assurance
process
Elected Member oversight
in terms of the quality
assurance process and
review programme for the
Project Management
Framework.
Fulfil good practice in project management
which recommends that a council's audit and
scrutiny committee have an important role to
play in providing independent assurances about
the delivery of major programmes and projects. 
The Panel’s role in this respect is therefore to be
assured that suitable review procedures have
been adopted and to gain assurance about the
value of independent reviews that are
undertaken during the project life cycle.       
✓  
Self-evaluation of
the Audit and
Scrutiny Panel
Effectiveness of the
performance and
activities of the Audit and
Scrutiny Panel in
discharging the scrutiny
aspects of its role.
Fulfil corporate governance principle E2.4 in line
with the Delivering Good Governance in Local
Government: Framework (2016) in terms of
developing capabilities to ensure Elected
Members have the appropriate skills,
knowledge, resources, and support to fulfil their
roles and responsibilities and ensuring they are   
• Report on agenda for Panel meeting on
04/09/23  ✓    
Page 188 of 240

Page 193

Scrutiny items, functions, or activities for
Audit and Scrutiny Panel meetings
Scrutiny of this item, function, or activity aims
to …
Cycle 1
16th Feb
2023
Cycle 2
18th May 
2023 
Mid-year update 
Cycle 3
4th Sept
2023
Cycle 4
16th Nov
2023
Cycle 1
15th Feb
2024
Cycle 2
9th May
2024
Cycle 3
29th Aug
2024
able to update their knowledge on a continuing
basis. 
Address the risk identified by Internal Audit in
terms of the council being able to adequately
demonstrate that it has effective audit committee
arrangements and/or arrangements to ensure
Elected Members have the skills, knowledge
and  (where appropriate or required) access to
relevant training and resources to effectively
undertake their role.
Training and
development
Elected Member training
on the scrutiny function,
of the Audit and Scrutiny
Panel, including aspects
of Best Value and the
supporting strategic
frameworks (i.e. Policy,
Governance,
Performance, Self-
Evaluation, and Project
Management) relevant to
each Member’s role on
the Panel. 
Note, formal training will be
scheduled for cycle 4 but
informal 1:1s can be
requested at any time.
Support the Best Value vision and leadership
theme in terms of Elected Members being self-
aware and committed to training and personal
development to update and enhance their
knowledge, skills, capacity, and capabilities to
deliver Best Value and perform their leadership
roles, and they receive sufficient support to do
so. 
Fulfil corporate governance principle E2.4 in line
with the Delivering Good Governance in Local
Government: Framework (2016) in terms of
developing capabilities to ensure Elected
Members have the appropriate skills,
knowledge, resources, and support to fulfil their
roles and responsibilities and ensuring that they
are able to update their knowledge on a
continuing basis.      
✓    
Page 189 of 240

Page 194

Page 190 of 240

Page 195

North Lanarkshire Council
Report
Audit and Scrutiny Panel 
Does this report require to be approved? ☒ Yes   ☐ No
Ref KH/SL Date 04/09/23 
Strategic Performance Framework - Performance Reporting
Schedule quarterly performance assurance review 
From  Katrina Hassell, Chief Officer (Business and Digital)  
E-mail HassellK@northlan.gov.uk Telephone 07903 096121 
Executive Summary
Following on from the Strategic Performance Framework - Performance Reporting
Schedule 2023 to 2024 report at the Audit and Scrutiny Panel meeting in February 2023,
a subsequent report in May 2023 set out the first performance assurance review that had
been undertaken of performance reports which had been submitted to council committees
during cycle 1 of 2023.  The report in May 2023 also advised that performance assurance
reviews would thereafter be reported to the Audit and Scrutiny Panel on a quarterly basis. 
In bringing together a summary of the council’s performance reports in one composite
assurance overview in this way, this approach supports the Audit and Scrutiny Panel in
maintaining strategic oversight and awareness of the council’s performance reporting
arrangements in line with the Panel’s remit to provide “independent review of the council’s
governance, risk management, performance and control frameworks”. It also supports the
Audit and Scrutiny Panel’s governance and accountability role in terms of ensuring the
council can demonstrate Best Value through the existence of robust arrangements for
performance reporting and scrutiny.   
This report herewith provides the Panel with the outcome from the performance assurance
review that has been undertaken of performance reports which have been submitted (in
line with the Performance Reporting Schedule) to council committees during cycle 2 of
2023. 
Recommendations
It is recommended that the Audit and Scrutiny Panel: 
(1)  Review the composite overview of performance reporting provided in Appendices 1
and 2 to maintain an awareness of each report within the Performance Reporting
Schedule for 2023 to 2024, and
(2)  Identify whether there are any significant issues arising, from the composite
performance overview presented in the attached Appendices, that the Panel
considers requiring additional scrutiny and a further report to be submitted to a future
meeting of the Panel from the respective Chief Officer. 
The Plan for North Lanarkshire
Item 13
Page 191 of 240

Page 196

1. Background 
1.1 Members of the Audit and Scrutiny Panel will recall the report in February 2023 which
contained the Strategic Performance Framework - Performance Reporting Schedule.
This set out the reporting, review, and scrutiny arrangements for a range of
performance information to be considered at each cycle of committee meetings for
2023 to 2024. 
1.2 The Strategic Performance Framework comprises performance
measurement at three levels (as per the diagram on the right). 
This aims to collectively provide an overview of performance to
help understand the impact of council activities on improving
services and outcomes for the people and communities of North
Lanarkshire.  The measures in this Framework allow for day to
day activities, and progress towards achieving the long-term
vision set out in The Plan for North Lanarkshire, to be regularly
monitored, reported, assessed, and scrutinised.   
1.3 The supporting Performance Reporting Schedule forms a key part of the Scrutiny Work
Programme that underpins the Best Value governance and accountability theme by
ensuring the council can demonstrate the existence of robust arrangements for scrutiny
and performance reporting.  It also aims to fulfil the Audit and Scrutiny Panel’s remit as
per the Scheme of Administration to:
• Review and monitor the performance of the council in delivering upon its priorities,
outcomes, programme of work and targets in the council plan, specifically
performance in improving local services and outcomes and in demonstrating Best
Value.
• Review performance to assess whether intended policy outcomes have been
achieved. 
1.4 The Strategic Performance Framework comprises a set of non-negotiable standards
which Chief Officers are required to apply in all performance reporting that supports the
Framework.  These standards aim to ensure that performance reporting is:
• Aligned - to The Plan for North Lanarkshire to give stakeholders an insight into the
performance of council activities both in the short-term and against the long-term
ambitions.
• Consistent - to ensure a standard, easily recognisable, and well established
process across each different audience over time.  This aims to help build
credibility, reliability, and a common understanding.
• Transparent - to allow stakeholders to understand what is being measured, what
it means, what level of performance has actually been achieved, and what
difference this means in reality for the people and communities of North
Lanarkshire.
• In context - to avoid the So What? question and provide a coherent narrative to
ensure fully informed review, reporting, scrutiny, and decision making processes.
• Balanced - to ensure any text adds value and tells a balanced narrative. 
Performance reports should identify areas requiring improvement as well as areas
of good performance.  Narrative should include reasons for performance levels not
in line with targets and the remedial action undertaken to address this. 
1.5 The Performance Reporting Schedule shows there is a significant volume of
Priority  All priorities
Ambition statement All ambition statements
Page 192 of 240

Page 197

performance information timetabled to be reported to various council committees in 
each cycle of 2023 to 2024. Cycle 2 reports were reviewed by the Business
Management Team in June 2023 to ensure the relevant assurances in terms of
performance management arrangements that promote effective use of the council’s
resources, performance information being scrutinised at a senior management level,
and performance monitoring arrangements in place to effectively address areas of
underperformance, identify the scope for improvement, and agree remedial action. 
1.6 The volume of performance information in the cycle 2 reports has also been reviewed
and summarised further in Appendices 1 and 2 attached.  It should be noted that the
performance information within Appendices 1 and 2 has already been reviewed by
Service Committees during cycle 2.  The purpose of the information presented herewith
is to provide Audit and Scrutiny Panel members with a composite, but easily digestible,
overview for governance and assurance purposes in line with the specific scrutiny role
of the Panel. 
2. Quarterly performance assurance review 
2.1 The Strategic Performance Framework - Performance Reporting Schedule sets out
three aspects of performance reporting which are noted below.  Paragraphs 2.2 to 2.8
itemise the performance reports submitted to cycle 2 committees in line with these
aspects and in accordance with the timetable set out within the Schedule. 
(1) Chief Officer’s individual six monthly Performance Reviews at Service Committees
in line with the Strategic Performance Framework.
(2) Corporate reporting to the Audit and Scrutiny Panel and/or Policy and Strategy
Committee in line with the Strategic Performance Framework.
(3) Chief Officer service specific performance reporting which takes place each year
to meet business and/or statutory obligations. 
(1) Chief Officer’s individual six monthly Performance Reviews at Service Committees
in line with the Strategic Performance Framework. 
2.2 The Strategic Performance Framework comprises a range of performance indicators
from each Chief Officer’s portfolio and the latest results in this respect are aligned to
the respective ambition statements in The Plan for North Lanarkshire.  The nine reports
scheduled to be submitted to the relevant committee in cycle 2 of 2023 are listed in
Table 1 below, along with the corresponding hyperlink for ease of access.  Note, as
health and social care performance is reported quarterly there are two reports included
in this review period.
Table 1
Report title Committee Date
Strategic Performance Framework - latest performance
results for Community Operations
https://mars.northlanarkshire.gov.uk/egenda/images/att1
00512.pdf 
Environment and
Climate Change
Committee
3 May 2023
Strategic Performance Framework - latest performance
results for the Tackling Poverty service
https://mars.northlanarkshire.gov.uk/egenda/images/att1
00521.pdf 
Wellbeing and Tackling
Poverty Committee 5 May 2023
Strategic Performance Framework - latest performance
results for Housing Management
https://mars.northlanarkshire.gov.uk/egenda/images/att1
00556.pdf 
Housing Committee 10 May 2023
Page 193 of 240

Page 198

Strategic Performance Framework - latest performance
results for Housing Property Services
https://mars.northlanarkshire.gov.uk/egenda/images/att1
00557.pdf 
Housing Committee 10 May 2023
Strategic Performance Framework - latest performance
results for Place (economic regeneration and growth)
https://mars.northlanarkshire.gov.uk/egenda/images/att1
00583.pdf 
Enterprise and Fair
Work Committee 12 May 2023
Strategic Performance Framework - latest performance
results for Employability 
https://mars.northlanarkshire.gov.uk/egenda/images/att1
00584.pdf 
Enterprise and Fair
Work Committee 12 May 2023
Strategic Performance Framework - latest performance
results for Children’s Social Work and Protection
https://mars.northlanarkshire.gov.uk/egenda/images/att1
00787.pdf 
Education, Children,
and Families
Committee 
23 May 2023
Health and Social Care North Lanarkshire performance
update - Quarter 3 (October - December 2022)
https://mars.northlanarkshire.gov.uk/egenda/images/att1
00574.pdf 
IJB Performance,
Finance and Audit
Committee
19 April 2023
Health and Social Care North Lanarkshire performance
update - Quarter 4 (January - March 2023)
https://mars.northlanarkshire.gov.uk/egenda/images/att1
00911.pdf 
IJB Performance,
Finance and Audit
Committee
21 June 2023 
2.3 Each council report was produced in line with a standard template and (a) provides the
reader with the current context within which the service is operating, (b) highlights areas
of good performance that can be evidenced in the accompanying data, and (c) provides
a summary of areas of performance requiring improvement along with narrative that
gives an explanation for the level of performance achieved and summarises the
remedial action implemented (or to be implemented) to bring performance back on
track.   
2.4 A short summary analysis for each of the nine reports is set out in Appendix 1 against
the five non-negotiable standards. 
(2) Corporate reporting to the Audit and Scrutiny Panel and/or Policy and Strategy
Committee in line with the Strategic Performance Framework. 
2.5 This aspect of performance reporting is in place to meet Best Value requirements and
support Elected Members to carry out their independent governance, accountability,
and strategic oversight role in line with the Scheme of Administration.  It corresponds
to the Scrutiny Work Programme for the scrutiny element of the Audit and Scrutiny
Panel which was endorsed by the Panel in February 2023.  
• Other than the quarterly performance assurance review report itself, there were no
items scheduled for reporting within this category in cycle 2 of 2023. 
(3) Chief Officer service specific performance reporting which takes place each year to
meet business and/or statutory obligations. 
2.7 This aspect relates to service specific reporting which is required to meet business
and/or statutory obligations.  This is included in the Performance Reporting Schedule
to ensure all of the council’s performance reporting arrangements are captured in the
one place and the Schedule reflects a one council approach to performance reporting.   
Page 194 of 240

Page 199

2.8 The six reports scheduled to be submitted to the relevant committee in cycle 2 of 2023
are listed in Table 2 below, along with the corresponding hyperlink for ease of access.
A short summary for each of these reports is set out in Appendix 2.  While this summary
is set out against the five non-negotiable standards it also recognises there may be
statutory specific approaches or standards which require to be adhered to. 
Table 2
Report title Committee Date
Community safety hub performance and development
https://mars.northlanarkshire.gov.uk/egenda/images/att100529.pdf 
Housing
Committee  10 May 2023
Mainstreaming equality report
https://mars.northlanarkshire.gov.uk/egenda/images/att100517.pdf 
Wellbeing
and Tackling
Poverty
Committee
5 May 2023
Building standards annual verification performance report 2022/23
https://www.northlanarkshire.gov.uk/sites/default/files/2023-
05/Building%20Standards%20Annual%20Verification%20Performa
nce%20Report%202022-23_0.pdf 
Submitted to
the Scottish
Government
Published on
council
website on
17 May 2023
Revenue and benefits update 
https://mars.northlanarkshire.gov.uk/egenda/images/att100687.pdf 
Finance and
Resources
Committee
24 May 2023
Financial monitoring report - council summary (revenue)
https://mars.northlanarkshire.gov.uk/egenda/images/att100693.pdf 
Finance and
Resources
Committee
24 May 2023
Financial monitoring report - council summary (capital)
https://mars.northlanarkshire.gov.uk/egenda/images/att100688.pdf 
Finance and
Resources
Committee
24 May 2023 
Next steps 
2.9 Performance reports submitted to the respective committee (in line with the
Performance Reporting Schedule) will continue to be kept under review by the senior
management team of the council so that adherence to the timetable is maintained.  This
will also seek to ensure the relevant assurances in terms of the efficient and effective
operation of the council and the ongoing delivery of the long-term ambition set out in
The Plan for North Lanarkshire underpinned with corporate governance, risk
management, and financial management controls. 
2.10 Assurance reviews will continue to be undertaken and reported to the Audit and
Scrutiny Panel on a quarterly basis in order to achieve the measures of success set out
in paragraph 3.1. 
3. Measures of success 
3.1  Measures of success include:
• Regular oversight and monitoring of performance across the organisation to gain
assurances in terms of governance and accountability.
• Regular review and challenge processes to scrutinise the performance of the
council to ensure effective use of resources and that resources are directed in
accordance with agreed policy and according to priorities, while ensuring sound
decision making and clear accountability for the use of resources in achieving
improved outcomes for service users and the local community. 
• Performance monitoring, management, and reporting arrangements that support
the demonstration of improved performance in local services and outcomes, and
Page 195 of 240

Page 200

the delivery of Best Value. 
4. Supporting documentation 
Appendix (1) Chief Officer’s individual six monthly Performance Reviews at Service
Committees in line with the Strategic Performance Framework.
Appendix (2) Chief Officer service specific performance reporting which takes place
each year to meet business and/or statutory obligations. 
Katrina Hassell
Chief Officer (Business and Digital) 
5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Page 196 of 240

Page 201

The Local Government Act 1992 established the role of the Statutory Direction to
direct the “publication of information as to standards of performance”.  
The Local Government in Scotland Act 2003 introduced the duty of Best Value; this
requires that councils “make arrangements to secure continuous improvement in
performance”.  
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Improvements in the presentation of performance information to various audiences
are being advanced in line with the development of the DigitalNL work package for
the Business Intelligence (BI) Hub. 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Implementation of the Performance Reporting Schedule, which will facilitate
effective review and scrutiny processes, contributes to the mitigation of the risk on
the Corporate Risk Register for governance, leadership, and decision making.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)?
Page 197 of 240

Page 202

Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐  
Page 198 of 240

Page 203

Appendix 1
(1) Chief Officer’s individual six monthly Performance Reviews at Service Committees in line with the Strategic Performance Framework (SPF). 
Report title Summary
SPF - Latest performance
results for Community
Operations 
May 2023
Community Operations have 40 indicators in the Strategic Performance Framework which assess efficiency and effectiveness in terms of service
delivery on a day to day basis. A suite of statutory indicators also enables performance, costs, and satisfaction to be assessed and compared
nationally.   
Following the structural realignments in the One Place One Plan - Governance update report approved at Policy and Strategy Committee in
December 2022, a single Community Operations service was created to strengthen the council’s delivery of community operations and put people
and communities at the heart of the change that The Plan for North Lanarkshire aims to achieve. This realignment brought a wide range of community
facing services in relation to the council’s environmental assets (i.e. Street Cleaning, Grounds Maintenance, Cemetery Services, Roads Maintenance
Operations, and Country Parks for the Future) together with regulatory services (i.e. Environmental Health and Trading Standards), and services in
respect of Waste Solutions, Fleet Resources, and the Built Environment. 
https://mars.northlanarkshire.gov.uk/egenda/images/att100512.pdf 
Aligned Priority:    • Improve the health and wellbeing of our communities.
• Enhance participation, capacity, and empowerment across our communities.
Ambition statement: 14. Ensure the highest standards of public protection.
16. Transform our natural environment to support wellbeing and inward investment and enhance it for current and future generations.
17. Ensure we keep our environment clean, safe, and attractive.
Consistent The pre-defined template was used to ensure a standard, easily recognisable, and well established process across each different audience over time.  The use of
this template aims to help build credibility, reliability, and a common understanding.
Transparent RAG indicators: 
Page 199 of 240

Page 204

Benchmarking indicators:
• Parks and open spaces - cost per 1,000 population
• Satisfaction - % of adults satisfied with parks and
open spaces
• Street cleaning - net cost per 1,000 population 
• Satisfaction - % of adults satisfied with street
cleaning services
• Street cleanliness score - % areas assessed as
clean 
• Satisfaction - % of adults satisfied with refuse
collection 
• Roads - cost of maintenance per kilometre of roads
• Road network - % A class roads that should be
considered for maintenance treatment
• Road network - % B class roads that should be
considered for maintenance treatment
• Road network - % C class roads that should be
considered for maintenance treatment
• Road network - % Unclassified roads that should be
considered for maintenance treatment
• Road casualties - number of fatal and serious
casualties
• Road casualties - number of fatal and serious
casualties involving children
• Trading standards - cost per 1,000 population
• Environmental health - cost per 1,000 population
• Street lamps - energy usage 
In context The service’s operating environment has changed significantly in recent years and, as such, performance should be considered within the following context: 
• The extent to which the service has supported the council in terms of responding to and recovering from the pandemic over the last three years, while
maintaining service delivery of critical areas of public health and safety in line with legislation, and then resuming business as usual activities at pace which
involved dealing with significant volumes in terms of a backlog. 
• In resuming business as usual activities, many areas of the service have experienced a subsequent increase in the volume of business which has added to
the caseloads which require to be dealt with (e.g. in environmental health).
• New legislation implemented in the aftermath of the pandemic has impacted on inspection regimes and has required changes to processes and ways of
working (e.g. in food safety). 
• A significant rationalisation exercise is underway across the waste service to allow consolidation of the service within key depot facilities. This in turn will result
in overall efficiencies for the service with the resulting effect of freeing up space for other service areas to consolidate their own facilities and ultimately provide
a capital receipt for the council through the sale of any depot deemed surplus to requirements.
• There is currently an ongoing review of the overall structure of the new Community Operations service to ensure that any opportunities and service efficiencies
with the recent amalgamation of the two service areas are highlighted and maximised.
Balanced Performance highlights: 
• Council performance in respect of A class roads (i.e. major and strategic roads) and B class roads (i.e. roads serving a local purpose and connecting to
strategic roads) considered to require maintenance treatment continues to remain lower than the average for Scotland and the family group of similar councils: 
-  17% of A class roads in North Lanarkshire are considered to require maintenance treatment compared to the Scottish average (27.6%) and the family
group of similar councils (24.2%); this is the third lowest in Scotland. 
-  23% of B class roads in North Lanarkshire are considered to require maintenance treatment compared to the Scottish average (33.6%) and the family
group of similar councils (24.3%); this is the eighth lowest in Scotland. 
• Latest results show 43.2% of household waste was recycled in North Lanarkshire. This is a marked improvement compared to recent years and the council is
now above the national average (42.7%). Recycling also shows improvement over the period of The Plan for North Lanarkshire (from a baseline of 41.1%).
Areas of performance requiring improvement:
• The volume of requests for pest control visits continues to remain high although the provision of the free rodent control service up to the end of the 2022/23
financial year will have had a significant impact on this. From 1 April 2023, the council made the decision to reinstate pest control charges for rats and mice. A
report to the Environment and Climate Change Committee in February 2023 ( https://mars.northlanarkshire.gov.uk/egenda/images/att99874.pdf ) provided an
update on the steps that continue to be taken in respect of the action plan which was devised in order to direct resources to the areas of most significant
rodent concern, co-ordinate the council’s response to the best effect, and deliver improvements. 
• 2021/22 results for performance in building warrants is lower than the target and previous years, although performance has picked up in 2022/23 to date. The
volume of business - which had increased significantly in 2019/20 and remained high over the period of the pandemic - has returned to pre-pandemic levels.
However the pandemic resulted in an increase in design work and building warrant submissions, and a shift in focus from site work to building warrant
submissions. Staff shortages, support issues, and system outages have since impacted on the latest performance results achieved.  Page 200 of 240

Page 205

• The service’s cost indicators for roads and environmental health (prepared by the Improvement Service through the Local Government Benchmarking
Framework (LGBF)) reported an increase in spend during 2020/21 and 2021/22 that was counter to the long-term pre-pandemic trend. The increased
expenditure in 2021/22, in particular, reflects a resumption in activity that had been deferred during the pandemic and also included additional funding
provided to address the recovery period from the pandemic. 
• Overall the performance results available through the Local Government Benchmarking Framework (LGBF) suite of indicators represents a mixed picture
across all councils in Scotland. In some instances councils have sustained and strengthened improvement trends in a number of policy critical areas. In other
areas (particularly those community related services) there has been a decline which has often been caused, or exacerbated, by the pandemic; this includes
areas which were previously improving pre-pandemic (such as street cleanliness levels).
Report title Summary
SPF - Latest performance
results for the Tackling
Poverty service 
May 2023
The Tackling Poverty service have 10 indicators in the Strategic Performance Framework which enable the service to monitor efficiency and
effectiveness in terms of service delivery and case management on a day to day basis. This also allows year on year comparisons. The Tackling
Poverty team also provide an annual activity report to committee that provides details of the income maximisation work carried out in that year. 
As part of the Towards a Fairer North Lanarkshire Tackling Poverty Strategy 2020-23 (approved in June 2020), the council provides general and
specialist welfare rights services and supports to individuals and families in North Lanarkshire which are crucial to those who are entitled to benefits,
including those on low incomes. This assists service users to claim all benefits to which they are entitled. 
The main focus of all welfare rights work is to support income maximisation through provision of direct advice and support for claims, consultation and
guidance for fieldwork staff, representing clients at tribunals and hearings, and supporting specialist social work services. Successful welfare rights
interventions (where individuals are awarded extra benefit) frequently means that, as a result of increased income, they are better able to manage
their own affairs and may not require further social work services. Successful outcomes in terms of income maximisation therefore play a vital role
across social work services including those for adults, children and families, justice services, mental health, and addictions as well as supporting
associated health inequalities, housing sustainability, and community wellbeing, and bringing further income into the local economy. 
https://mars.northlanarkshire.gov.uk/egenda/images/att100521.pdf 
Aligned Priority:  • Support all children and young people to realise their full potential. 
• Improve the health and wellbeing of our communities.
Ambition statement: 9. Invest in early interventions, positive transitions, and preventative approaches to improve outcomes for children and young people.
11.  Increase economic opportunities for adults by understanding, identifying, and addressing the causes of poverty and deprivation and
barriers to financial inclusion.
Consistent The pre-defined template was used to ensure a standard, easily recognisable, and well established process across each different audience over time.  The use of
this template aims to help build credibility, reliability, and a common understanding.
Transparent RAG indicators:    Volume indicators:
• Benefits - number of debt advice referrals received
• Money advice - number of clients accessing service
for assistance with single multi debt issues
• Provision of financial education - number of pupils
completing financial education
In context • Local approaches to tackling poverty and reducing inequality continue to be driven in line with the Towards a Fairer North Lanarkshire Tackling Poverty Page 201 of 240

Page 206

Strategy 2020-23 which is focused on the key drivers of poverty. This strategy sets out an integrated approach to co-ordinating resources across the council
(and with partners) to support effective delivery and ensure fairer outcomes for all local people can be achieved and sustained. 
• The effects of the pandemic impacted many individuals and communities in North Lanarkshire and brought income maximisation and the wider work
undertaken to tackle poverty into a sharper focus, highlighting the impact of low paid and insecure work in particular. The subsequent impact of the war in
Ukraine on the economy alongside the wider cost of living crisis (with high inflation, price increases on energy, soaring fuel and food costs, and a real term cut
in wages) continue to acutely affect inequality and poverty in North Lanarkshire, impacting the most vulnerable individuals in local communities. 
• In 2022, the council agreed a range of measures to be introduced to respond to the cost of living crisis and assist residents in this respect. An update in terms
of the implementation of these measures was considered by the Policy and Strategy Committee in March 2023, and a further update regarding future support
is scheduled to be presented to the Wellbeing and Tackling Poverty Committee in cycle 3 of 2023.
Balanced Performance highlights: 
• Council activity in terms of tackling poverty generated £35m in additional benefit income for the residents of North Lanarkshire during 2021/22. This is higher
than the previous year (£24m) and the amount predicted (£30m) for the year. 
• In cost / benefit terms for every £1 invested by the council in income maximisation in 2021/22, this generated £27.52 for local residents and the local
economy. This is higher than the previous year (£19.10).
Areas of performance requiring improvement:
• 21,485 benefits checks were undertaken during 2021/22 to identify if a person’s income is fully maximised or if there are any shortfalls which can be remedied
via the benefit system. This is lower than predicted, but a benefit check is available to all of North Lanarkshire's residents and is carried out for all who request
this service. To date in 2022/23, 17,703 checks have been undertaken as at February 2023 suggesting a slight fall in in-year checks undertaken. Further
analysis will be undertaken to identify any factors behind this alongside continued promotion of the service. This will include analysis of referrals made by
services as well as contact made with the first point of contact helpline whose capacity has been extended to provide wider cost of-living advice and support. 
• The provision of financial education for school pupils was unable to be delivered due to the pandemic. A refreshed programme has now been re-established
with delivery linked to Future Fridays, and therefore it is anticipated the provision of this service will revert to pre-pandemic levels.
Report title Summary
SPF - Latest performance
results for Housing
Management 
May 2023
Housing Management have 14 indicators in the Strategic Performance Framework covering all aspects of the council’s social landlord role. 
As set out in the council’s Local Housing Strategy 2021-26 (approved at committee in February 2021), there are an estimated 157,625 dwellings in
North Lanarkshire, with home ownership remaining the predominant tenure and 63% of households owning their own home.  The council is the
largest local authority landlord in Scotland and almost a third (29.5%) of households rent from a social landlord (23.3% from the council and 6.2%
from other social landlords). 
The Local Housing Strategy 2021-26 recognises that an affordable, warm, and accessible home (that meets individual needs over the course of their
life) is the foundation for people to achieve their full potential in all aspects of life, such as educational attainment and employment.  Housing also
plays a crucial role in addressing homelessness, tackling poverty, mitigating the impacts of climate change, improving health and wellbeing and
promoting inclusive growth. 
https://mars.northlanarkshire.gov.uk/egenda/images/att100556.pdf 
Aligned Priority:  • Improve economic opportunities and outcomes.
Ambition statement: 1. Ensure a housing mix that supports social inclusion and economic growth.
Consistent The pre-defined template was used to ensure a standard, easily recognisable, and well established process across each different audience over time.  The use of
this template aims to help build credibility, reliability, and a common understanding.
Transparent RAG indicators: Page 202 of 240

Page 207

In context • As the cost of living continues to rise many council tenants are facing mounting financial pressure. A new Rent Assistance Fund has been introduced which
will help council tenants on low-incomes and universal credit who don’t currently qualify for any other UK or Scottish Government financial support. 
• As reported to the Housing Committee (in February 2023) there are over 10,000 tenants, 70% of whom are on universal credit, who are experiencing rent
arrears. The rent assistance fund will seek to ensure tenancy levels are maintained despite the challenges faced by cost of living rises. 
• Feedback received from frontline staff is that rising energy costs and rising food costs are causing increasing financial pressure on families in North
Lanarkshire which has led to an increase in tenants contacting the council looking for assistance. In addition, the council has seen an increase in homeless
presentations of approximately 12% over the year. 
• The council has also welcomed families escaping the conflict in Ukraine to North Lanarkshire. Two towers have been repurposed to provide safe, secure
residences and offer a sense of place and community for up to two hundred families, mainly women and children.
Balanced Performance highlights: 
• Lets to homeless has increased this year (41.1%), higher than last year’s results and the target of 37%. 
• The percentage of decisions made within 28 days for households under 25 years old presenting as homeless is above the target of 95% at 97.3%. 
• High levels of satisfaction continue to be achieved with the quality of temporary accommodation at 96.6%, above the target of 94%. This satisfaction is due to
the continual review of the quality of furnishings and fittings in council accommodations as well as a high level of decoration of the properties.
Areas of performance requiring improvement:
• The percentage of decisions made within 28 days for households presenting as homeless is slightly below the target of 95% at 94.2%, this figure reflects the
transient nature of the client group, where maintaining contact to allow staff to make decisions within timescale can be difficult. Monthly audits and training for
new housing advisors, as well as the introduction of new backshift housing advisors, are measures undertaken to improve this area of service. The new
backshift housing advisors will help engage with service users at other times outwith standard working hours. 
• The average number of days to re let properties has increased to 32.2 days due to a number of factors, with the percentage of rent due in the year that was
lost due to properties being empty (void rent loss %) sitting just above target at 1.01%. Service pressures have been particularly difficult and recruitment of
relevant trades by contractors continue to have a direct impact on service delivery in the turnaround of vacant properties. Regular liaison between the housing
management teams, housing property teams, and main repair contractor is ongoing with weekly and daily monitoring of vacant properties takes place.
Report title Summary
SPF - Latest performance
results for Housing
Property Services 
Housing Property Services have 12 indicators in the Strategic Performance Framework covering all aspects of the housing property and maintenance
service. 
As Scotland’s largest local authority landlord the council provides warm, secure, affordable homes to more than 36,000 households across North Page 203 of 240

Page 208

May 2023 Lanarkshire.  As set out in the Housing Asset Management Plan (HAMP) 2021-26 (approved at committee in February 2021), improving, maintaining
and repairing homes are core asset management activities.  Maintenance refers to routine activities to prevent damage and extend the lifespan of
property components (like roofs, windows, and doors) and ensure that homes are safe while repairs are works carried out to fix any defects in a
property.  Improvements are delivered through the investment programme, which generally focuses on replacing old components with new ones - for
example, by installing new kitchens and bathrooms. Like all social landlords, the council has legal duties to repair and maintain its homes, to meet
obligations set out in tenancy agreements and statute, and tenants rightly also expect timely maintenance and responsive repairs services. This is
reflected in the importance given to maintenance and repair matters in the Annual Return on the Charter (ARC), a yearly exercise co-ordinated by the
Scottish Housing Regulator to assess social landlords’ performance. Landlords must report on over 30 separate performance indicators, many of
which directly relate to the condition of homes and how they are managed. 
https://mars.northlanarkshire.gov.uk/egenda/images/att100557.pdf 
Aligned Priority:  • Improve economic opportunities and outcomes. 
• Improve North Lanarkshire's resource base.
Ambition statement: 1. Ensure a housing mix that supports social inclusion and economic growth.
22. Facilitate a North Lanarkshire wide approach to asset rationalisation, including with communities and partners.
Consistent The pre-defined template was used to ensure a standard, easily recognisable, and well established process across each different audience over time.  The use of
this template aims to help build credibility, reliability, and a common understanding.
Transparent RAG indicators: 
In context • Although service delivery is no longer being impacted by the pandemic, there is still evidence of a small number of appointments being cancelled due to the
tenant or a household member having covid. Service pressures have been particularly difficult and recruitment of relevant trades by contractors continues to
have a direct impact on service delivery. 
• The freezing temperatures in December 2022 resulted in a small proportion of tenants being decanted due to burst pipes and flooding, with other tenants
being able to still reside in their property while the service carried out the necessary repairs.
Balanced Performance highlights: 
• Timescales for completing emergency repairs within council housing stock for all 3 contractors, year to date, is 3.2 hours, better than the target of 3.7 hours. 
• Performance for non-emergency repairs is also better than the target of 7 days at 6.7 days. 
• The percentage of reactive repairs carried out in the last year completed right first time is also above the target of 95% at 97.5%. 
• Performance in corporate property repairs (i.e. council office stock) is also above target across the range of indicators, with the percentage of emergency Page 204 of 240

Page 209

repairs completed within timescale at 97.3% and a 4.2 hours average time to compete emergency repairs. The percentage of routine repairs completed within
timescale is currently 98.3% with an average time of 8.9 days to complete routine repairs.
Areas of performance requiring improvement:
• The corporate property repairs indicator for the average time in hours taken to complete emergency repairs is 4.2 hours, which is higher than the target of 3.3
hours; this is due to the materials and trades shortages. Remedial actions include having weekly meetings with contractors where issues are highlighted at the
earliest stage to allow proactive resolution. A further issue is that the contractors’ new operatives are not closing lines in the correct way and are receiving
further training to improve this process.
Report title Summary
SPF - Latest performance
results for Place
(economic regeneration
and growth) 
May 2023
Within Place (economic regeneration and growth) there are 9 indicators in the Strategic Performance Framework that focus on assessing efficiency
and effectiveness in terms of local regeneration, service delivery, and case management on a day to day basis. A suite of statutory indicators also
enables performance to be assessed and compared nationally. In this respect Strategic Performance Framework reports in relation to Place are also
considered by the Planning Committee and the Housing Committee in line with the terms of reference set out in the Scheme of Administration. 
Following the structural realignments in the One Place One Plan - Governance update report approved at Policy and Strategy Committee in
December 2022, a single Place based service was created that aims to strengthen place based operations across North Lanarkshire and focus on
creating local conditions that support inclusive and green growth and enable people to thrive.  This realignment brought together a range of place
related services in order to further focus efforts on the physical and economic regeneration of North Lanarkshire and create new opportunities that
benefit all residents and help reduce poverty and disadvantage. Activity within the realigned Place service therefore comprises the following -
Planning, Enterprise, Growth, New Supply, City Deal and Enterprise Projects, and Infrastructure and Transportation. 
https://mars.northlanarkshire.gov.uk/egenda/images/att100583.pdf 
Aligned Priority:  • Improve economic opportunities and outcomes.
Ambition statement: 1. Ensure a housing mix that supports social inclusion and economic growth.
2. Refocus our town centres and communities to be multi-functional connected places which maximise social, economic, and
environmental opportunities.
3. Maximise the use of our marketable land and assets through improved development in business and industrial infrastructure.
4. Market and promote North Lanarkshire as the place to live, learn, work, invest, and visit.
5. Grow and improve the sustainability and diversity of North Lanarkshire’s economy.
Consistent The pre-defined template was used to ensure a standard, easily recognisable, and well established process across each different audience over time.  The use of
this template aims to help build credibility, reliability, and a common understanding.
Transparent RAG indicators:  Benchmarking indicators:
• Land allocated for employment - immediately available employment land as a % of total land allocated
for employment purposes in the local development plan
• Economic development and tourism - investment per 1,000 population
• Town vacancy rates - % of vacant commercial units as % of total units for the local authority town centre
• Business gateway - number of start ups per 10,000 population
• Business survival - % of newly born enterprises surviving for at least 5 years
Regeneration indicators:
• Vacant and derelict land - number of hectares of land improved for business and industrial use
• Active travel - km of active travel routes enhanced or created
• Jobs - estimated number of gross construction jobs created Page 205 of 240

Page 210

In context • As well as meeting its statutory planning responsibilities, the Place service delivers the council’s physical regeneration and infrastructure projects and strives
to attract new investment and employment to North Lanarkshire. The UK’s exit from the European Union, the pandemic, the Russia/Ukraine conflict (including
increases in the price of oil, gas, and other natural resources) - followed by inflationary pressures and the cost of living crisis - have had a significant impact on
service provision and the delivery of projects and the capital programme in line with original plans and timescales. Supply chain pressures (availability and
costs) are expected to continue, and economic forecasters do not expect inflation to return to lower levels in the near future. Current pressures are resulting in
increasing prices, delays and/or non-availability of certain items and there is no indication these pressures will disappear in the short-term. 
• The Planning (Scotland) Act 2019, and the recently adopted National Planning Framework 4, bring new challenges for the Place service, principally for the
Planning service but also potentially impacting on the delivery of council projects which will need to meet the new requirements. During the pandemic the
council played a key role in delivering a range of short-term actions and activity (including the administration of a range of grant schemes, advisory services,
and employability and business support programmes) to support businesses and people at risk of becoming unemployed or economically inactive. While
continuing to provide support to local businesses to help them access available funding and survive the immediate impacts of the pandemic, the council
(working with partners) is striving to support economic recovery in the medium to longer term - within the added context of an increasingly competitive
employment market which adds to the challenge. This support aims to not only help businesses to survive, but enable existing businesses to adapt and grow,
attract new business growth, and create a more resilient and inclusive economic base for the future.
Balanced Performance highlights: 
• The national indicator in terms of the number of new businesses supported per 10,000 population remains high in North Lanarkshire and above national and
family group averages. This level of performance is encouraging in the aftermath of the pandemic as it is also reflected in the council’s measure which shows
that 579 new businesses were supported through financial and non-financial assistance in 2021/22. New business formation is a good indicator of how helpful
the council is in enabling entrepreneurship in the business environment. The long-term impacts of the pandemic in terms of survival rates for businesses
surviving for at least five years does not yet show a decrease in the number of businesses surviving, the impact to date appears to be more on the creation of
new enterprises. Development work is underway to further enhance recording, monitoring, and reporting of the extent of the council’s business support and
engagement; new indicators in this respect will be introduced into Strategic Performance Framework reporting for 2024/25. 
• The Economic Regeneration Delivery Plan (ERDP) seeks to co-ordinate and maximise the economic impact of the council’s place-based investment in
housing, town centres, infrastructure, and industrial developments. In addition to the direct benefits that these programmes bring to local communities, the
council’s investment also provides construction employment opportunities which, for the period 2019/20 - 2021/22, is estimated at 1,040 jobs as a result of
ERDP related investment.
Areas of performance requiring improvement:
• Town vacancy rates remains higher than the national and family group averages. However, this is a short-term measure that can only be impacted upon by
long-term activities and the council already has in place a large-scale transformation programme for North Lanarkshire’s town centres, including, for example,
ambitious plans to redevelop Cumbernauld town centre. The most recent update in this respect was reported to committee through the ERDP performance
framework annual progress report in August 2022. The ERDP aims to create vibrant mixed-use towns where people live, work, shop, eat, and access local
services. As such, recognition needs to be given to the fact that vacancies may temporarily increase where vacant possession of redundant retail centres or
land assembly is required to enable transformative change.
Report title Summary
SPF - Latest performance
results for Employability 
May 2023
Within the service area of Employability there are 10 indicators in the Strategic Performance Framework.   
Council funded employability programmes are adept at aligning sources of external funding available to council plans and strategies and increasing
their scale and reach. The current external funding environment has been considerably bolstered in recent years by additional resources from the
Scottish Government to support the No One Left Behind policy and Young Person’s Guarantee in order to alleviate the impact of pandemic
restrictions on the labour market. These sources have been used alongside the long-term support the council has gained from the European Social
Fund. The external funding environment is now changing with the end of EU funding and the introduction of the UK Shared Prosperity Fund. In
parallel to this change, the introduction by the Scottish Government of funding in 2023/24 for local employability services to support parents into
employment will create further opportunities. Work is underway to finalise contracts with current external funders and integrate and align new sources Page 206 of 240

Page 211

of funding into council priorities and plans. 
https://mars.northlanarkshire.gov.uk/egenda/images/att100584.pdf 
Aligned Priority:  • Improve economic opportunities and outcomes. 
• Support all children and young people to realise their full potential. 
Ambition statement: 2. Grow and improve the sustainability and diversity of North Lanarkshire’s economy.
3. Raise attainment and skills for learning, life, and work to enhance opportunities and choices.
Consistent The pre-defined template was used to ensure a standard, easily recognisable, and well established process across each different audience over time.  The use of
this template aims to help build credibility, reliability, and a common understanding.
Transparent RAG indicators:  Benchmarking indicators:
• Positive destinations - % pupils leaving school and entering a positive destination.
• Participation rate - % 16-19 year olds engaged with an organisation for the purposes of
learning, training, or work.
• Employment support - % unemployed people assisted into work from council operated /
funded employability programmes.
• Living wage - % of people (age 18+) in employment earning less than the real living wage.
• Out of work benefits - claimant count as a % of working age population.
• Out of work benefits - claimant count as a % of the population aged 16 to 24.
In context • The labour market in North Lanarkshire has significantly changed in the post pandemic period with several positive trends emerging. These include low
unemployment, increases in average pay, and sustained levels of participation in the labour market for young people. 
• The key challenge that has emerged is the increase in economic inactivity, particularly in the numbers classified as long-term sick which in North Lanarkshire
has risen from 16,500 in March 2020 to 28,400 in September 2022. A combination of these factors has also led to some local employers and sectors finding it
difficult to recruit and retain employees. 
• Also within the context of employability is the challenge of persuading unemployed and economically inactive residents that they can be better off in work and
the current cost of living crisis has intensified that challenge. Current cross service work with the Tackling Poverty team and other services continues to be
integral to the work of the employability team.
• For 2021/22 it is likely that the effects of the pandemic affected the choices made by some young people and this - combined with the effects of alternative
approaches to certification of SQA qualifications since 2020 - will have had an impact on school leaver destinations. In addition, school leaders have
highlighted increased non-attendance and mental health issues as a result of the pandemic as having an impact on post-school destinations. While the latest
figures show a small percentage point decrease of 0.3% on the previous year, a significantly higher number of young people left school and entered a positive
destination. The percentage of young people entering Higher Education was above the national average, with Further Education and employment both higher
than the previous year. Notwithstanding this, 130 young people left school and entered the negative destination of unemployed and seeking employment.
Balanced Performance highlights: 
• The number of unemployed residents accessing council support has grown in tandem with the increased external funding available in recent times. All council
funded programmes are targeted at people who are not only unemployed, but who have additional barriers to getting a job. Alongside this the numbers
supported into employment have been high with the conversion from engagement to job entry remaining consistent, despite the fast-changing labour market.
Most importantly, the percentage of people supported into employment - that have sustained employment - remains at 70% or above. This performance has
consistently benchmarked the council’s programmes of support above the national and family group of similar councils. 
• In terms of the work to close the disability employment gap in North Lanarkshire, the Supported Employment team continue to work with over 200 disabled
people every year using their person-centred model of support, with consistently higher rates of employment sustainability at 6 months after job entry than
mainstream programmes. In recent years the team have expanded their work in supporting young people, who have additional support needs or who are care Page 207 of 240

Page 212

experienced, to transition from school into long-term work placements leading to employment. An example of this is the new Sunnyside Café based at the
Volvo Trucks site in Newhouse Industrial Estate which offers work experience and training to these young people. 
• The nationally recognised Pathways Programme supported 145 S4-S6 young people with multiple barriers to learning and most at risk of entering a negative
post school destination; this includes school non-attenders, care experience young people, young people with additional support needs and those living in
areas of highest socio-economic deprivation. Of the 145, 134 are currently in a positive post school destination or remain in continued support. 54 are in
employment, with a further 39 in further education or training.
Areas of performance requiring improvement:
• Together with the continued delivery of large-scale employability support to all unemployed and underemployed residents there is some evidence to suggest
that programmes which are more targeted on thematic groups can be more effective, based on work undertaken with Routes to Work Ltd in the last 12
months. Therefore, within employability programmes funded by the council there will be increased targeting of specific groups where employment levels or
engagement with mainstream programmes is not reflective of their representation in local communities. Alongside this, an increased focus on supporting
parents into employment, or into better paid work, will be undertaken as part of the drive to reduce child poverty. 
• As the current demand for labour for some sectors and employers is unlikely to be met without additional measures, new programmes to address the sharp
increase in economic inactivity are planned for implementation using a model piloted by Routes to Work Ltd in 2022 along with the UK Shared Prosperity
Fund. This aims to draw economically inactive residents into the labour market, or encourage them to return to it.
Report title Summary
SPF - Latest performance
results for Children’s
Social Work and
Protection 
May 2023
Children’s Social Work and Protection have 8 indicators in the Strategic Performance Framework which focus specifically on a range of statutory
areas of children’s social work services and providing national benchmarking information for key indicators.  This complements information on social
work performance and improvement activity presented annually to committee through the Annual Report of the Chief Social Worker (CSWO). The
most recent CSWO report for the period 2021/22 was presented to committee in February 2023. 
Children’s Social Work Services are delivered within a wider partnership context with oversight and strategic direction also provided through the Chief
Officers Public Protection Group and Children’s Services Partnership, for which the CSWO is lead officer. A key driver of improvement and
transformation over the past three years has been the Promise as reflected in the Children’s Services Plan 2021-23.  Two programmes of work
(Keeping the Promise - Care and Keeping the Promise - Family Support) have been the subject of regular reporting to committee over the past two
years. 
https://mars.northlanarkshire.gov.uk/egenda/images/att100787.pdf 
Aligned Priority:  • Support all children and young people to realise their full potential. 
• Improve the health and wellbeing of our communities.
Ambition statement: 7. Enhance collaborative working to maximise support and ensure all our children and young people are included, supported, and safe.
9. Invest in early interventions, positive transitions, and preventative approaches to improve outcomes for children and young people.
14. Ensure the highest standards of public protection.
Consistent The pre-defined template was used to ensure a standard, easily recognisable, and well established process across each different audience over time.  The use of
this template aims to help build credibility, reliability, and a common understanding.
Transparent Benchmarking indicators:
• Looked after children - gross cost of children looked after in residential based services per child per week.
• Looked after children - gross cost of children looked after in a community setting per child per week.
• Balance of care for looked after children - % of children being looked after who are cared for in the community.
• Looked after children - number of looked after children as a % of the populated (aged 0 to 17).
• Looked after children - % with more than one placement in the last year. Page 208 of 240

Page 213

• Child protection - number of children on the child protection register per 1,000 population (aged 0 to 15).
• Child protection - average number of areas of concern recorded for each child on the child protection register.
• Child protection - % of child protection re-registrations within 18 months.
In context • The most recent Children’s Services Plan 2021-23 was published in spring 2021 and is framed around the foundations of the Promise and the United Nations
Convention on the Rights of the Child (UNCRC); young people were integral to the development of the plan.  The task groups supporting the delivery of the
plan have been reconfigured in line with the updated priorities with new groups focusing on Voice and Family Support, the Corporate Parenting Task Group
evolving into the Promise Partnership Care, and a refreshed Mental, Health, Wellbeing, and Resilience Task Group. 
• Children’s social work is uniquely placed to drive and connect the key strands of work required to support the ambitions of the Promise and the required
transformation of systems, outcomes, and experience for children and families. This is due to the key statutory role social work plays in supporting children
and young people and their families both for children in need and those experiencing (or who have experienced) care and the underpinning values of inclusion
and empowerment alongside a culture of partnership working. 
• New national guidance for child protection in Scotland (published in 2021) frames the delivery of the children and families social work service. This updated
guidance places the safeguarding of children and young people within the wider context of Getting It Right For Every Child (GIRFEC) and further emphasises
the impact of poverty and the role of early family support while also focusing on emerging harms, including extra-familial harm (the latter a driver for the
development of the contextual safeguarding approach in North Lanarkshire). 
• The performance report reflects the latest data available which covers a period heavily impacted by the pandemic. During this period some areas of statutory
activity were suppressed, not only in North Lanarkshire, but nationally due to a range of factors (this included some aspects of harm and need being less
visible and the suspension of the children’s hearing and court systems during periods of high restrictions of non-emergency business). As reflected in the
CSWO report for the period 2021/22, demand on children’s social work has since risen with referrals to children and families social work services growing over
the past two years and 15% higher in 2021/22 than in 2018/19. This appears to reflect an increase in the need for support from children and families within the
community. Although further work is needed to fully understand the picture which sits behind this, the change is perhaps unsurprising given the evidence that
the pandemic impacted disproportionately those already faced the greatest adversities, including children’s early development and wider wellbeing.
Balanced Performance highlights: 
• 1% of the North Lanarkshire’s population (aged 0 to 17) are currently looked after by the local authority. The figures for 2021 show a decrease of 11.9% in the
number of young people looked after compared to 2020. National average figures over the same period show 1.3% of children are looked after, with an 8.3%
decrease over the same period. A focus on family support, strengths-based practice, and integrated working has enabled North Lanarkshire to continue to
achieve fewer children looked after per head of population than the national average, however it should be noted that the biggest fall over this period (both in
North Lanarkshire and nationally) related to children and young people experiencing care at home, with this change in part relating to the impact of the
pandemic on children’s hearing system activity. 
• The council continues to show year on year improvement in terms of children looked after in the community; the latest figures show that 96.5% of children
experiencing care within North Lanarkshire were looked after in the community in family placements. This compares to 90.3% nationally and a family group
average of 88.7%. The council has consistently performed in the top quartile in Scotland in this indicator and the latest results show the council to be ranked at
number 1 in Scotland.  A significant element of this relates to the role of kinship care. 
• The need for a safe, stable place to live, and ongoing secure relationships is central to a child’s plan. Latest figures show there are 4.4% of children in North
Lanarkshire with more than one placement in the last year 2020/21.  This compares to 16.8% nationally and a family group average of 13.8%. The council has
consistently performed in the top quartile in Scotland in this indicator and has remained ranked at number 1 in Scotland for the last 7 years. This demonstrates
the extent of the council’s commitment to maintaining the need to secure and maintain attachments in care planning, while recognising that no two cases will
be the same, and each child must be placed in a situation that is appropriate to them. However, a level of caution must be applied when considering the
figures for children and young people experiencing care during this period when compared with the previous year, as again the pandemic had some impact on
care planning and non-urgent moves, including permanent placements. The latest low figures may therefore not be maintained going forward.
Areas of performance requiring improvement:
• For this period the gross cost of children looked after in residential based services per child per week was higher in North Lanarkshire than the national and
family group averages. This will continue to be monitored as - while there were some pandemic related cost pressures (e.g. related to additional cover
requirements) and there are inflationary pressures in this sector (most notably with respect to external placements) - the council remains a relatively low user Page 209 of 240

Page 214

of external residential care.  The primary driver of the increase in costs appears to have been a temporary reduction in numbers of young people in residential
care at the specific point of reporting and the associated rise in unit costs. 
• While traditionally the council uses residential care proportionality less than the national average, there has been a subsequent increase in young people in
the council’s own children’s houses for three main reasons - the council’s commitment to providing support to unaccompanied children seeking asylum in a
nurturing and safe environment, openness to taking older young people back into care when they need and ask for it, and the growth in continuing care. 
• Following a drop of a third in numbers of children and young people supported in external residential placements over 2018-21, the number has plateaued
despite a longer-term commitment to providing support close to home. This is due to a range of factors relating both to demand, complexity of need, and the
long-term nature and supporting relationships associated with some of these placements. Nonetheless it remains a key priority of the council to ensure
increased capacity to support young people with complex needs within local communities.
• This also drives efforts to recruit more in-house foster carers. While there are currently slightly fewer children in foster care, the focus on supporting and
encouraging young people to remain with their carers for as long as they need means a continued and sustained increase in the use of continuing care, with
the effect that some foster and kinship carers are now continuing carers. 
• With respect to child protection, a trend over recent years has been the increase in the number of concerns recorded in relation to individual children. While
this remains lower in North Lanarkshire than the national average, it reflects increased complexity and adversities impacting on children and their families.
North Lanarkshire also saw an increase in the number of children and young people who were re-registered on the Child Protection Register over this period.
While the primary driver of decisions in this area will always require to be individual circumstances, further focus is required on support for sustainable
improvement in family circumstances and safeguarding (including after de-registration). This will be monitored closely going forward.
Report title Summary
Health and Social Care
North Lanarkshire
performance update -
Quarter 3 (October -
December 2022) 
April 2023
The Chief Officer (for the Health and Social Care Partnership) has joint quarterly performance review meetings with the Chief Executive of NHS
Lanarkshire and the Chief Executive of North Lanarkshire Council. These meetings are supported by a Chief Executive Performance Framework
comprising a range of performance measures from across both health and social work systems, including relevant targets and trajectories. 
Quarterly reports are subsequently submitted to the Integration Joint Board Performance, Finance, and Audit Committee.  The purpose of these
reports is to provide an update on the areas for improvement what have been identified as part of the quarterly performance review. 
https://mars.northlanarkshire.gov.uk/egenda/images/att100574.pdf 
Aligned Priority:  • Improve the health and wellbeing of our communities.
Ambition statement: 12. Ensure our residents are able to achieve, maintain and recover their independence through appropriate supports at home and in
their communities.
13. Improve preventative approaches including self-management and giving people information and choice over supports and services.
14. Ensure the highest standards of public protection.
Consistent A pre-defined template is in place to ensure a standard, easily recognisable, and well established process for quarterly reporting.
Transparent Based on a traffic-light system there are areas for improvement identified within the performance framework each quarter for those areas that are flagged as Red
or Amber.  The areas for improvement identified are progressed as a matter of priority, and progress updates are reported at future meetings of the Integrated
Joint Board and/or the Integration Joint Board Performance, Finance, and Audit Committee as appropriate.
In context The joint performance review meetings (involving the Chief Officer for the Health and Social Care Partnership, the Chief Executive of NHS Lanarkshire, and the
Chief Executive of North Lanarkshire Council) are used as a means for jointly agreeing corrective actions.
Balanced Note, the purpose of this report is to provide an update on the areas for improvement what have been identified as part of the quarterly performance review.
The quarterly report to committee sets out the corresponding narrative and corrective actions agreed for the areas identified for improvement which includes
increased and targeted information provision and communications to increase cervical screening uptake, additional clinics to ensure the uptake for immunisation Page 210 of 240

Page 215

of 2 and 5 year olds remains high, a range of measures to address delayed discharge / home support / reablement issues in terms of improving the flow and
referrals process for patients throughout the various aspects of the system, and prioritising the provision of integrated equipment and adaptations to support
hospital discharges and prevent admissions.  In addition, corrective actions have also been put in place to support child and adolescent mental health services
(CAMHS) through improved flexibility of response and positive messaging around what is being delivered, waiting times for psychological therapies, adult mental
health consultations, paediatric services, referrals for treatment for allied health professional (AHP) and community services, and referrals for the stop smoking
service.  All long-term and short-term sickness absences continue to be managed in accordance with the relevant policies of NHS Lanarkshire and North
Lanarkshire Council.  A number of resources remain in place to support staff who are experiencing sickness absence, including spiritual care, the SALUS
helpline, and psychological support services.
Report title Summary
Health and Social Care
North Lanarkshire
performance update -
Quarter 4 (January -
March 2023) 
June 2023
The Chief Officer (for the Health and Social Care Partnership) has joint quarterly performance review meetings with the Chief Executive of NHS
Lanarkshire and the Chief Executive of North Lanarkshire Council. These meetings are supported by a Chief Executive Performance Framework
comprising a range of performance measures from across both health and social work systems, including relevant targets and trajectories. 
Quarterly reports are subsequently submitted to the Integration Joint Board Performance, Finance, and Audit Committee.  The purpose of these
reports is to provide an update on the areas for improvement what have been identified as part of the quarterly performance review. 
https://mars.northlanarkshire.gov.uk/egenda/images/att100911.pdf 
Aligned Priority:  • Improve the health and wellbeing of our communities.
Ambition statement: 12. Ensure our residents are able to achieve, maintain and recover their independence through appropriate supports at home and in
their communities.
13. Improve preventative approaches including self-management and giving people information and choice over supports and services.
14. Ensure the highest standards of public protection.
Consistent A pre-defined template is in place to ensure a standard, easily recognisable, and well established process for quarterly reporting.
Transparent Based on a traffic-light system there are areas for improvement identified within the performance framework each quarter for those areas that are flagged as Red
or Amber.  The areas for improvement identified are progressed as a matter of priority, and progress updates are reported at future meetings of the Integrated
Joint Board and/or the Integration Joint Board Performance, Finance, and Audit Committee as appropriate.
In context The joint performance review meetings (involving the Chief Officer for the Health and Social Care Partnership, the Chief Executive of NHS Lanarkshire, and the
Chief Executive of North Lanarkshire Council) are used as a means for jointly agreeing corrective actions.
Balanced Note, the purpose of this report is to provide an update on the areas for improvement what have been identified as part of the quarterly performance review.
The quarterly report to committee sets out the corresponding narrative and corrective actions agreed for the areas identified for improvement which includes
improving the recording of alcohol brief interventions (ABI), increased and targeted information provision and communications to increase cervical screening
uptake, additional clinics to ensure the uptake for immunisation of 5 year olds remains high, carrying out further investigation and analysis to understand the
reason for late or no assessments in terms of 6-8 week reviews, and a range of measures to address delayed discharge / home support / reablement issues in
terms of improving the flow and referrals process for patients throughout the various aspects of the system.  In addition, corrective actions have also been put in
place to support child and adolescent mental health services (CAMHS) through improved flexibility of response and positive messaging around what is being
delivered, waiting times for psychological therapies, adult mental health consultations, paediatric services, referrals for treatment for allied health professional
(AHP) and community services, and referrals for the stop smoking service.  All long-term and short-term sickness absences continue to be managed in
accordance with the relevant policies of NHS Lanarkshire and North Lanarkshire Council and performance in this area reflects wider performance within the
partner organisations, with nursing and midwifery in NHS Lanarkshire continuing to be the most challenging area.  Page 211 of 240

Page 216

Appendix 2
(2) Chief Officer service specific performance reporting which takes place each year to meet business and/or statutory obligations. 
Report title Summary
Community safety hub
performance and
development 
May 2023
A report in 2020 provided a one off update on the performance of the Community Safety Hub following its merger into the council’s Housing
service.  In order to ensure ongoing performance monitoring this report has now been incorporated into the service’s programme of annual
service performance reports. 
https://mars.northlanarkshire.gov.uk/egenda/images/att100529.pdf 
Aligned Priority:  • Improve the health and wellbeing of our communities.
Ambition statement: 14. Ensure the highest standards of public protection.
Consistent A standard set of measures are in place which are recorded and monitored consistently in order to provide a live and complete picture of community safety
across North Lanarkshire.  These measures focus on incidents captured (criminal incidents, community safety incidents, and anti-social incidents),
environmental incidents, evidence requests (evidence disks, and review requests), and missing persons.
Transparent A breakdown of all types of incidents is provided in a summary table which compares current year figures with previous years.
In context The Plan for North Lanarkshire aims to make North Lanarkshire a better place to live, learn, work, invest, and visit, where homes and public spaces are
safe - and feel safe - for everyone. The work of the Community Safety Hub plays a key role in this respect by improving community safety through CCTV,
tackling anti-social behaviour, and ensuring public protection.  The Community Safety Hub currently delivers: 
• 24 hour/365 days per year proactive monitoring of 1,310 public space CCTV cameras in North Lanarkshire. 
• Evidence disks for Police Scotland, the Crown Office, and the Procurator Fiscal. 
• Call handling for the anti-social behaviour service 24/7. 
• Management of the public protection service within Housing Management. 
• An out of hours anti-social behaviour witnessing service. 
• An out of hours telephony service for homelessness and the organisation of out of hours homeless standby provision. 
• Co-location of Police Scotland officers. 
• An emergency response centre and relaying of CCTV images to support the council's resilience capacity during major incidents, adverse weather, or
other emergencies.
Balanced • Work to upgrade the 162 urban housing CCTV cameras on the network is nearing completion, with 130 cameras upgraded over the past two years. The
remainder will be upgraded over the coming financial years.  This has significantly benefited the communities with increased night-time performance
from the high-definition cameras assisting in incidents that may have proven more difficult to detect in the past. 
• All homeless out of hours contacts are now being handled by a dedicated call handling team who operate from the Hub every evening and all weekend.
This is delivered along with the anti-social behaviour service allowing a streamlined team to deliver both services. Homeless call handling activities
commenced in May 2022 from the Hub. 
• Anti-social behaviour services for non-council tenants were due to be reviewed in line with funding, however this has now been extended and services
will continue to be available to all residents of North Lanarkshire, irrespective of tenure of their property. 
• Sound Monitoring Equipment (SME) is currently being deployed by the night team.  The current number of complainants on the waiting list is 14, this is
constantly under review and additional equipment is purchased when necessary. 
• Options around alternative products or tools (such as the Noise App), which may be used to support the requirement for SME being deployed, are
being explored.  It is hoped that alternative solutions may become available in the next financial year. 
• A further area of development within the anti-social behaviour service is the deployment of a new Break the Cycle initiative that is planned to be Page 212 of 240

Page 217

delivered across all Primary and Secondary schools.  Input is planned for Primary 7 pupils due to transmission to secondary school, this will be aimed
at showing the impact of anti-social behaviour in communities. 
• Secondary pupils from the senior years will also be trained in delivery of an information session around anti-social behaviour and CCTV and the impact
it has on the wider community. This will be presented to the younger secondary school children with the hope that the work can be accredited and
added to the Personal and Social Education (PSE) curriculum for the pupils taking part. 
• Within the service, work has been undertaken to develop a new case management system to increase efficiency of record handling within the public
protection team, work is ongoing with testing of the system to ensure all functionality required is included. This system will assist the team with workflow
and information gathering for attendance at multi-agency meetings.
Report title Summary
Mainstreaming
equality report 
May 2023
Every two years public bodies covered by the Public Sector Equality Duty (PSED) are required to publish a number of reports and information to
evidence how they are meeting the needs of people whose characteristics are protected by the Equality Act 2010 - the PSED (General Duty).  In
line with the council’s requirement and timelines to publish this information for its own services and activities, the Mainstreaming Equality report
therefore contains:
• A full copy of the 2023 Mainstreaming Equality report, detailing how the council (including the Education Authority and the Licensing Board) is
demonstrating that the general equality duty is integral to its work.
• Linked and updated details on progress made to delivering against the stated Equality Outcomes for 2021-25.
• An up-to-date picture of the current equalities profile of employees and employment practices.
• Pay gap information as required to be published by law every two years. 
https://mars.northlanarkshire.gov.uk/egenda/images/att100517.pdf 
Aligned Priority:  • All
Ambition statement: • All
Consistent The report follows the same format and reports a wide and consistent suite of equalities information.
Transparent The report provides an account in terms of the council’s compliance with the equality duty, demonstrating that the council continues to evidence its due
regard of the need to eliminate unlawful discrimination, harassment and victimisation, and any other conduct prohibited by the Equality Act 2010, advance
equality of opportunity between people who share a protected characteristic and those who do not, and foster good relations between people who share a
protected characteristic and those who do not.  It presents a significant volume of information that reflects the council’s response to equalities across all
services.
In context The report reiterates that mainstreaming equality effectively requires a culture at all levels of an organisation where the needs of people with protected
characteristics are not an afterthought but are integral to everything it does.  As such, central to the council’s ambition for North Lanarkshire to be the place
to live, learn, work, invest, and visit is a vision of inclusive growth and prosperity for all.  An integral aspect of delivering the vision (in line with The Plan for
North Lanarkshire) is therefore addressing the disadvantage and inequality that some groups of people experience because of societal constructs,
prejudice, or direct and indirect discrimination and ensuring a commitment from all employees at all levels to understand the causes and consequences of
inequality. 
The Equality Strategy 2019-24 (approved at committee in August 2019) sets out the council’s commitment to equality and human rights and its clear
understanding of the disadvantage and inequality that exists for some people and communities. Through five working objectives for success, the strategy
outlines how equality will continue to be part of the everyday work of the council thereby ensuring a mainstreamed approach.
Balanced The report highlights some encouraging areas of real progress and change, alongside work being undertaken within services to ensure that the council
fully considers and supports residents who are covered under the provisions of the Equality Act 2010.  However, the report also notes that there are Page 213 of 240

Page 218

particular areas of inequality and disadvantage that persist. Many of these areas are not quick fixes but require a long-term strategic, partnership, and
sustained approach that includes instigating positive action measures and campaigns, and include:
• Tackling the disproportionate impacts of poverty on women (particularly older women), disabled people, and some minority ethnic groups.
• Ensuring community engagement and communication mechanisms are accessible and work to meet the needs of different communities.
• Ensuring children and young people who experience barriers to education leave school with positive destinations and futures.
• Ensuring the workforce reflects the diversity of North Lanarkshire.
• Ensuring procurement contracts assist to advance the council’s equality duties. 
Many of these areas are already the subject of action plans that are being driven by specific working groups - Equally Safe at Work, Tackling Poverty,
Violence Against Women Partnership, and Disability Confident Leader - and these will continue to provide the long-term strategic response needed.  The
new Equality Board, which has now been established with good representation from all services, will provide the added support and co-ordination to
progress matters, as well as supporting enhanced monitoring and review with regards to all aspects of equality including the equality outcomes.
Report title Summary
Building standards
annual verification
performance report
2022/23 
May 2023
The building standards profession in local authorities is responsible for delivering the verification service in Scotland.  The purpose of the building
standards system is to protect the public interest. The system sets out the essential standards that are required to be met when building work or
conversion of a building takes place in order to meet building regulations.  The building standards system checks that proposed building work or
conversion of a building meets standards; inspections are limited to a minimal necessary to ensure that legislation is not avoided. The control of
work on site is not down to the system but is a matter for contracts and arrangements in place between a builder and client.  Verifiers, appointed
by Scottish Ministers are responsible for the independent checking of applications for building warrants to construct or demolish buildings, to
provide services, fittings or equipment in buildings, or for conversions. 
The verification report is a strategic planning and management tool that provides information about the council’s building standards service,
communicates the vision and strategy, and sets out performance against strategic goals and targets.  Building standards verifiers in Scotland are
required to use the performance report to manage, monitor, review, and develop strategies for their business, and should focus on the
performance framework’s core perspectives and cross-cutting themes.   
https://www.northlanarkshire.gov.uk/sites/default/files/2023-
05/Building%20Standards%20Annual%20Verification%20Performance%20Report%202022-23_0.pdf
Aligned Priority:  • Improve the health and wellbeing of our communities.
Ambition statement: 14.  Ensure the highest standards of public protection.
Consistent The report is produced annually in a consistent format.  It includes information on service delivery, the timescales and targets to be met, and performance
against these.  Verifiers are required to provide returns to Scottish Government on both their performance and workload - the performance data relates to
the building standards verification performance framework while the workload data relates to the numbers of building warrant applications, completion
certificates, fees, costs, certificates (certification, energy performance, sustainability), and enforcement cases. 
The report also provides information regarding the Building Standards Charter which sets out the standards of service that all verifiers should meet.
This gives customers the reassurance that a consistent, high-quality service will be delivered no matter which verifier provides the service.
Transparent The national verification performance framework is based on three core perspectives (professional expertise and technical processes, quality customer
experience, and operational and financial efficiency).  There are also three cross-cutting themes - public interest, continuous improvement, and partnership
working.  The annual report is structured around this framework. 
7 performance outcomes are highlighted within the report and 11 performance targets are in place to assess performance and progress against these
outcomes.  The report has a dedicated section outlining the latest performance data against the targets along with supporting narrative. Page 214 of 240

Page 219

In context The report sets out the place based context within which the building standards service is delivered across North Lanarkshire (i.e. the main employment
sectors) as well as the operating context within the council.  As part of the Built Environment team in the council, Building Standards helps to support and
enable the delivery of local growth, making North Lanarkshire an attractive business location, improving employment opportunities, encouraging strong
sustainable communities, and enhancing and protecting the natural and built environment.
Balanced As well as the performance results, the report highlights actions completed within the last year together with a number of continuous improvement actions
which will be implemented in the forthcoming year (these cover the three core perspectives of professional expertise and technical processes, quality
customer experience, and operational and financial efficiency).  These actions are aligned to the respective performance outcomes and indicators in order
to ensure improvements implemented can be assessed in terms of performance on the ground in the future.
Report title Summary
Revenue and benefits
update 
May 2023
This report provides a regular update on the payment performance for council tax and non-domestic rates, the administration of a range of
welfare benefits, and the council tax reduction scheme. 
https://mars.northlanarkshire.gov.uk/egenda/images/att100687.pdf
Aligned Priority:  • Improve North Lanarkshire’s resource base.
Ambition statement: 21. Continue to identify and access opportunities to leverage additional resources to support our ambitions.
Consistent Produced quarterly, this report provides Elected Members with detailed in year performance figures which can be compared to the same period in previous
years.
Transparent The year to date performance set out in the report covers a wide range of service activities as well as the amount of funding paid out to help households in
need in order to provide a safety net for local people on low incomes.
In context The report includes the latest context within which the service is operating; this is of particular relevance given the ongoing administration of grants and
support payments required for low income households.  The report also advises of any new national grants when they are introduced, or will cease, and
the qualifying conditions for receipt of such.
Balanced In terms of grants, the report specifies the volume of applications assessed as well as the volume awarded and which were unsuccessful.
Report title Summary
Financial monitoring
report - council
summary (revenue) 
May 2023
This report presents the council’s revenue monitoring position for the General Fund Account, Housing Revenue Account, and Adult Health and
Social Care. 
https://mars.northlanarkshire.gov.uk/egenda/images/att100693.pdf 
Aligned Priority:  • Improve North Lanarkshire’s resource base.
Ambition statement: 21. Continue to identify and access opportunities to leverage additional resources to support our ambitions.
Consistent The report at each financial period end consolidates the budget monitoring position of all council services into one council summary. 
Transparent The report highlights and explains major variances as per the council’s approved Financial Regulations.  The Financial Regulations require services to
remain within their approved budgeting provision, and to report all significant deviations - defined as the higher of £100,000 or 5% - within their budget Page 215 of 240

Page 220

monitoring reports.
In context All activities undertaken by the council are subject to risk, and in acknowledging the council’s approved Risk Management Strategy, services manage these
as part of their overall corporate and service planning processes. The May 2023 report states that the current economic climate - such as the rising
forecast of pay and non-pay inflation, ongoing pandemic impact, the cost of living crisis, and other external factors - have the potential to impact upon the
council’s ability to provide quality services within approved budget levels.
Balanced Where significant deviations are identified, services must provide explanatory commentary, outline the action required to rectify such deviations and where
relevant, must also highlight the impact this has on other budget headings.  This information is captured by Finance and summarised in the overall council
report. 
Report title Summary
Financial monitoring
report - council
summary (capital) 
May 2023
This report presents the council’s capital monitoring position for the council’s capital programmes, including general services, housing revenue
account, City Deal, etc. 
https://mars.northlanarkshire.gov.uk/egenda/images/att100688.pdf
Aligned Priority:  • Improve North Lanarkshire’s resource base.
Ambition statement: 21. Continue to identify and access opportunities to leverage additional resources to support our ambitions.
Consistent The report at each financial period end consolidates the capital monitoring position of all council services into one council summary. 
The May 2023 also shows the 2022/23 projected outturn position and the resultant variances.
Transparent The Strategic Capital Investment Programme 2021/22 to 2025/26 was originally approved at Policy and Strategy Committee in March 2021, with an
updated programme profile for 2022/23 to 2025/26 approved in March 2022.  It represents the total Community Investment Programme incorporating the
General Services Capital Programme and HRA Capital Programmes. The programme was developed in conjunction with services and led by the Strategic
Capital Delivery Group (SCDG) using the principles established by the council’s Capital Strategy. 
In context The May 2023 report states that the capital programme continues to face challenges in relation to the wider economic climate linked to availability of
materials, contractors, and inflationary pressures and, as such, the SCDG met in February 2023 to agree reprofiling requests.  However, the report states
that challenges remain and, as a result, it is anticipated that the General Fund programme will underspend during 2022/23.  
Balanced The report provides a breakdown of the overall 2022/23 budget by service programme and associated approved budget movements. Further financial
performance information regarding each of the service programmes is also included to provide a narrative in terms of the current position of the capital
programme. 
Key to RAG status
green Performance is on target and/or within acceptable thresholds
red Performance does not meet target and is outwith acceptable thresholds
blue Performance surpasses the target and exceeds expectations
Page 216 of 240

Page 221

North Lanarkshire Council
Report
Audit and Scrutiny Panel 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    KH/JL Date 04/09/23 
Arm’s Length External Organisations (ALEOs): Governance and
Risk Management Oversight and Assurance Report  2023/24 
From  Chief Officer (Business and Digital)  
E-mail hassellk@northlan’gov.uk Telephone 07903 096121 
Executive Summary
The council delivers a number of services through arm’s length external organisations
(ALEOs) which have been developed over the past 20 years to provide services in new
ways that are innovative, responsive or more commercially driven. The council must have
confidence in the quality of service delivery and obtain assurances, through robust
monitoring, scrutiny and oversight, that the public purse continues to secure best value and
the externalised delivery arrangements are not exposing the council to potential
operational, financial or reputational risks. 
This report provides an overview of the ALEO landscape and the performance and financial
monitoring safeguards that are in place to provide such assurance. The report confirms
that ALEO Boards and Management Committees continue to demonstrate effective
stewardship, financial governance and risk management. 
In recent years the number of council owned ALEOs has reduced following service review
activity, or external factors, which highlighted that service provision via the externalised
delivery vehicles no longer represented best value for the council. As such, the council has
taken separate decisions to either in-source service delivery or cease provision and this
report provides an update on the status of current dissolution activity within Culture and
Leisure NL Ltd, NL Leisure Ltd and North Lanarkshire Municipal Bank Ltd. 
The report  also summarises current refinancing activity within North Lanarkshire
Properties LLP to secure future borrowing on the most advantageous terms for the
company and outlines potential changes that may be brought forward to the Articles of
Association in both Routes to Work Ltd and Fusion Assets Ltd. 
Recommendations
It is recommended that the Audit and Scrutiny Panel: 
(1) Acknowledges that ALEO governance, performance reporting and financial
monitoring arrangements are progressing satisfactorily;
(2) Confirms that the performance monitoring and oversight arrangements are
suitably robust and provide assurance that service delivery reflects Best Value;
(3) Acknowledges that current activity by North Lanarkshire Properties LLP to
refinance its outstanding loan balance is at an advanced stage and notes that
further update reports will be submitted to the Finance and Resources Committee;
Item 14
Page 217 of 240

Page 222

1. Background 
1.1. Arm’s Length External Organisations (ALEOs) can be established and funded by
councils to deliver a wide range of functions and services, including statutory duties.
ALEOs may offer an alternative to more traditional ‘in-house’ or contract based service
delivery and take the form of companies, charitable trusts, joint ventures or
partnerships. In setting up an ALEO, the council relinquishes its direct operational and
management responsibilities, however the council retains a degree of influence and
control through its shareholding in the company and the contractual agreement setting
out the services to be provided, performance monitoring arrangements and the level of
funding and/or management fee to be provided by the council. The ALEO operates
separately at ‘arm’s length’ to the council and is ‘external’ in that it has its own identity,
management structure, decision making and staffing responsibilities. 
1.2. There are various drivers behind a council choosing to deliver services via an ALEO
including financial benefits (through business rates relief or the ALEO being able to
secure external funding or generate income) and service delivery improvements
through increased flexibility, responsiveness or developing and delivering services in
innovative and more targeted ways. 
1.3. Notwithstanding these benefits, councils must have a strong business case to support
service delivery via an ALEO and be clear in the anticipated benefits for the council,
local residents and communities. Equally councils must have robust monitoring and
oversight arrangements in place to ensure that the council’s expectations are being met
and the services are being delivered to a high quality and achieving best value.
Accounts Commission guidance recommends that councils should periodically review
their ALEOs to ensure they remain the best option for service delivery and to ensure
effective governance is in place. 
1.4. North Lanarkshire Council has long-standing experience in service delivery via ALEOs
and our review, performance monitoring and oversight arrangements have developed
over time to reflect accounting standards and Accounts Commission guidance,
recommendations and best practice. 
1.5. This six monthly report is a key component of our ALEO governance arrangements,
providing Audit and Scrutiny Panel members with a status update on the current ALEO
landscape and oversight of existing monitoring arrangements to ensure that these
remain proportionate and sufficiently robust. 
(4) Acknowledges potential future changes to the separate Articles of Association
governing: 1) Fusion Assets Ltd; and 2) Routes to Work Ltd and notes that details
of proposed revisions will be reported via the Enterprise and Fair Work Committee
in due course. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement
(22) Facilitate a North Lanarkshire wide approach to asset
rationalisation, including with communities and partners
(25)  Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Page 218 of 240

Page 223

1.6. The report also provides assurance that adequate governance, financial governance,
risk management and business continuity arrangements remain in place within the
individual ALEOs and neither the council, nor the services provided, are exposed to
any financial, operational or reputational risks.   
2. Report 
2.1. North Lanarkshire Council was one of the first local authorities to externalise service
delivery via the separate Joint Venture Partnerships created between 2000 and 2001
with responsibility for roads; street lighting; winter maintenance; housing and corporate
property repairs; gas central heating and safety; and window and door replacement.
Routes to Work Limited, which continues to this day and is responsible for employability
support and training services, was established in 2002 as the council’s first wholly
owned ALEO. Subsequent ALEOs, established between 2006 and 2012, included
Culture and Leisure NL Ltd, Fusion Assets Ltd and North Lanarkshire Properties LLP. 
2.2. During the intervening period and based on the findings and recommendations from 
various service reviews, options appraisal and/or changes in the external operating
environment, the number of individual ALEOs has gradually reduced as the outsourced
service delivery arrangements were identified as no longer representing best value for
the council, or opportunities for closer alignment with The Plan for North Lanarkshire
and the council’s strategic objectives could be more effectively driven forward through
a return to inhouse provision. 
2.3. The current ALEO landscape is summarised below and further information on each
ALEO, including council officers and members appointed to the various Boards and
Management Committees, is provided at Appendix 1. 
ALEOs – where the company(ies) are wholly owned by the
council through 100% shareholding
Established
• Routes to Work
Limited (Ltd)
Employability services, including training and
support programmes delivered on behalf of the
Scottish and UK Governments, often targeting 
people who are furthest from the labour
market or are looking to upskill or return to
work after a period of unemployment or
redundancy. 
2002
• North
Lanarkshire
Properties LLP
and North
Lanarkshire
Property
(Investments) Ltd
Responsible for marketing, leasing and
managing the council’s commercial properties. 
NLP also manages the remaining balance of
the council’s investment property - the “legacy
estate” and provides general advice on wider
lease transactions, including managing lease
arrangements where the council occupies
externally owned properties.
2012
• Fusion Assets
Ltd
Economic regeneration and infrastructure
investment, particularly in areas where there is
little speculative development. Fusion Assets
works in partnership with the council to secure
Scottish Government Vacant and Derelict
Land Funding and Regeneration Capital Grant
Funding and regularly maximises the potential
and value of this through innovative private
sector funding agreements.
2006
Page 219 of 240

Page 224

Joint Venture Companies – formal partnership arrangements
where the council has 33.33% shareholding, and the parent
company holds the remaining 66.66% 
• MEARS Scotland
Limited Liability
Partnership (LLP)
Housing repairs.
Corporate properties’ repairs and
maintenance.
2010
• Amey Public
Services LLP
Roads and streetlighting repairs.
Winter maintenance including gritting and
snow clearing.
2010 
ALEO Review Activity and the Enterprise Project 
North Lanarkshire Municipal Bank (NLMB) Ltd 
2.4. Panel members are aware that following an anti-money laundering and financial crime
compliance review undertaken by the Royal Bank of Scotland in October 2021, the
Board of North Lanarkshire Municipal Bank (NLMB) Ltd considered the various issues,
challenges and implications in continuing to provide banking services, and agreed to
cease services and take the necessary steps close the Bank. This decision was ratified
by the Policy and Strategy Committee in October 2021. The Bank ceased to provide
accounts for new customers from October 2021 and closed to existing customers on
30 September 2022. The resolution for dissolution of the company was approved by
the NLMB Board on 2 May 2023, and the formal application for striking-off the company
was submitted to Companies House thereafter. The dissolution request was published
in The Edinburgh Gazette on 16 May 2023 with Notice that, as per Section 1003(3) of
the Companies Act 2006, unless any objections were received, NLMB Ltd would be
struck off the Register of Companies after a period of two months from publication of
the Notice and the company subsequently dissolved. This has now taken place with a
dissolution date of 1 August 2023. 
2.5. Prior to closure, the council publicised, via various communication methods, that
remaining account holders, who had not come forward to close their accounts and
withdraw funds before the Bank’s closure, could submit closure requests via the
council’s First Stop Shops. Following closure of the Bank, customer balances that had
not been withdrawn were transferred to an account held in trust by North Lanarkshire
Council. These balances do not represent assets available to the Council and are
excluded from the council’s balance sheet in the annual accounts. 
Culture and Leisure North Lanarkshire (CLNL) Ltd and North Lanarkshire (NL)
Leisure Ltd 
2.6. Following the council decision in January 2020 to insource delivery of culture, leisure
and related services with effect from 1 April 2021, the council has been undertaking
due diligence activity to wind up the business of the predecessor ALEOs: Culture and
Leisure NL Ltd and NL Leisure Ltd. 
2.7. The previous report to the Audit and Scrutiny Panel in February this year summarised
dissolution progress including filing of statutory accounts for 2021/22 and confirmation
from HMRC that VAT deregistration was complete. Panel members noted that work
remained outstanding to agree with all relevant parties the treatment of a small number
of personal injury insurance claims that had previously been lodged with CLNL Ltd or
NL Leisure Ltd and had not been resolved or settled prior to insourcing. 
Page 220 of 240

Page 225

2.8. The council has taken the place of CLNL and NL Leisure in these actions and an
administrative process is ongoing regarding these claims which includes notifying the
claimants in writing of the transfer to the council and of the intention to apply for CLNL
Ltd and NLL Ltd to be removed from the Register of Companies. This exercise is
designed to minimise the risk of any objections being lodged when the application for
strike-off is published through a similar process to that described for the North
Lanarkshire Municipal Bank at 2.4 above. 
2.9. In the interim, the statutory accounts for 2022/23 for CLNL, NL Leisure and both Trading
Community Interest Companies have been prepared, albeit at nil value. These will
require to be approved by the respective Boards and submitted to OSCR and
Companies House by 31 December 2023. 
Enterprise Project - MEARS Scotland LLP and Amey Public Services LLP 
2.10. The existing service delivery agreements in place between the council and MEARS and
Amey are due to come to their contractual terminations in January and June 2024
respectively. These Joint Venture Partnerships are responsible for: 
• Repairs to council housing stock plus corporate property repairs and
maintenance – MEARS Scotland LLP
• Roads and streetlighting repairs plus winter maintenance – Amey Public Services
LLP 
2.11. The council previously agreed in December 2018 that the above services would be in
scope for delivery through the Enterprise Project which aims, through a phased
approach, to integrate asset management functions across the council and to optimise
further asset related arrangements and strategic supply relationships to support The
Plan for North Lanarkshire’s place based ambitions. 
2.12. Procurement exercises are underway via Public Contracts Scotland with the Phase 1
contract awards expected to be made for both the Housing and Corporate Property
Contract and the Roads Contract in February 2024. 
Statutory Bodies, Associates and Joint Ventures 
2.13. Services are also delivered through individual public bodies that have been established
through separate pieces of legislation, either as part of local government reorganisation
in 1996 or more recently with the aim of improving services through better integration.
The council is represented on these joint boards: 
• Strathclyde Partnership for Transport;
• Strathclyde Concessionary Travel Scheme; and
• Lanarkshire Valuation Joint Board 
2.14. All local government functions that relate to these bodies have been delegated from
the constituent councils that make up the area served by each board1. The members
of each Board are elected councillors and appointed by their respective local authorities
in proportions specified in the legislation. Representation by North Lanarkshire Councill 
1 Strathclyde Partnership for Transport and Concessionary Travel – Constituent Councils: Argyll and Bute;
Renfrew; East Renfrewshire; Inverclyde; West Dunbartonshire; East Dunbartonshire; North Lanarkshire; South
Lanarkshire; City of Glasgow; North Ayrshire; East Ayrshire; South Ayrshire.
Lanarkshire Valuation Joint Board – Constituent Councils: North and South Lanarkshire Councils.
Page 221 of 240

Page 226

is shown in Appendix 2. The council has no shares, nor ownership of any of these
public bodies, however, they are included within the council's Group Accounts under
the wider definition of an "associate" because the council is represented on the board
of management and participates in policy-making processes. Local government
legislation provides that constituent local authorities have an obligation to meet the
expenditure of the Joint Boards and as a consequence, any liabilities from these Boards
must be fully incorporated within the individual authorities’ Group Accounts. 
2.15. Although the council has some influence over the operating policies of these public
bodies, plus financial obligations and liabilities as a constituent member, they are
entirely independent of the council under law and taxation. These statutory bodies are
already subject to external scrutiny and public accountability and as such, governance
and assurance responsibility does not generally fall within the scope of this report,
however, annual performance oversight updates are considered by the relevant service
committee as per the Scheme of Administration and the Strategic Performance
Framework. 
Health and Social Care North Lanarkshire 
2.16. Health and Social Care North Lanarkshire Integration Joint Board, which brings
together adult social work services and  NHS Lanarkshire’s community based health
services through the Public Bodies (Joint Working) (Scotland) Act 2014 is consolidated
in the council’s Group Accounts as a Joint Venture, on a 50% equity basis and the
council has the power to exert its influence through membership of the Integration Joint
Board. Again, governance responsibility does not sit with this Panel since the Health
and Social Care Partnership is accountable via the Integration Joint Board (IJB) and
the Performance, Finance and Audit Committee. 
2.17. Appendix 2 provides further details on the statutory bodies described above. 
Performance Monitoring
2.18. The ALEOs are separate legal entities in their own right with their own governance and
financial management obligations, however, the council remains accountable for
service delivery, whether performed in-house or through alternate, arm’s length
arrangements. Performance monitoring arrangements have developed over time and
are well documented through the Strategic Performance Framework and previous
Panel reports. 
2.19. Responsibility for ongoing monitoring and ensuring that services are being delivered as
per the council’s expectations and the terms set out in the Service Level Agreement or
Partnership Agreement rests with the relevant client service, with separate oversight
by Finance to ensure robust financial management and stewardship are in place. Chief
Officers, with responsibility for services or functions delivered through an ALEO, submit
a six monthly performance report to the relevant service committee and details of the
most recent reporting periods are provided in Appendix 1 for the ALEOs and Joint
Venture Strategic Partnerships and Appendix 2 for the statutory bodies. 
Financial Monitoring 
2.20. The council has a duty under it’s “Following the Public Pound” obligations to ensure
that the external organisations delivering services on its behalf are financially sound.
The Chief Officer (Finance), as the council’s Section 95 Officer, is responsible for
maintaining appropriate and proportionate processes and procedures for scrutinising
ALEOs’ financial performance. The individual contractual arrangements specify the
Page 222 of 240

Page 227

financial information which each ALEO must submit to the council, and this enables
Financial Solutions to assess and report on any potential financial risk likely to arise as
a result of the council using the ALEO to deliver services. The following paragraphs
highlight, by exception, financial matters that require close monitoring by the individual
ALEOs’ Board of Directors or Management Committees, along with robust, separate
oversight by Financial Solutions. 
North Lanarkshire Properties (NLP)  LLP / North Lanarkshire Property
(Investments) Ltd 
2.21. North Lanarkshire Properties (NLP) are continuing to be affected by supply chain labour
shortages and inflationary pressures which have impacted the property and
construction industry in recent months. There is a potential risk that these delays will
impact on the timescales relating to re-letting properties. 
2.22. NLP are continuing to review the company’s 5 year Investment Plan. As a business
NLP are having to align the medium to long term investment plan with market conditions
and where possible this will continue to be funded by long term rent reviews. 
2.23. A joint NLP and council project team, which includes the Finance Manager acting for
NLP under the Service Level Agreement and the Business Finance Manager on behalf
of the council, is supporting NLP in refinancing the outstanding loan balance
(approximately £33m) which must be completed by the end of October. The company
procured external professional advice through Azets Holding Limited who are working
with the project team and with the preferred lender to implement a new loan agreement
from 1 November 2023. Specific reports on the refinancing activity have previously
been submitted to the Finance and Resources Committee earlier this year as
summarised below. 
• 1 March 2023: Explanatory background report by the Chief Officer (Finance) which
also sought approval that the council continues to serve as guarantor, at up to 80%,
for future loan repayments due by NLP (click on link for report); and,
• 24 May 2023: Report by the Chief Officer (Finance) requesting that authority be
delegated to the Chief Officer (Finance) to approve NLP’s future borrowing on
behalf of the Council, including the appointment of the successful lender and
finalised loan agreement terms (click on link for report). 
2.24. A further progress update report, confirming the preferred lender and current credit
processing and loan agreement negotiations is due to be considered by the Finance
and Resources Committee on 13 September 2023 and a final report will be presented
in cycle 4 confirming the agreed terms of the borrowing arrangement. 
Amey Public Services LLP 
2.25. A change in auditors resulted in delays in the provision of the draft annual accounts for
the previous 2022 financial year . This activity will be closely monitored in future years
(2023 and 2024) to ensure that timescales, as stipulated within the Partnership
Agreement, are met. 
Routes to Work Limited 
2.26. As previously reported, the provision of financial information within the previous
financial year was impacted by staff shortages within Routes to Work’s finance team.
This has now been resolved.
Page 223 of 240

Page 228

2.27. Routes to Work continue to operate with high levels of unrestricted reserves, however
several contingent liabilities are being held against these reserves. Therefore, an
assessment of the current reserve policy has been agreed as part of the review of the
draft accounts with any proposed changes being presented at the AGM in September. 
Overall Assurance 
2.28. The performance oversight at paragraphs 2.18 and 2.19 above and the information
included in Appendices 1 and 2, together with the additional financial monitoring
provided by the Chief Officer (Finance) through both the service committee reports and
this report, provide assurance to Audit and Scrutiny Panel members that ALEOs’
organisation and financial performance is regularly monitored and reported. 
2.29. Officers from Finance, Business and Digital and the individual Client Services regularly
attend ALEO Board or Management Committee meetings providing further oversight
and importantly, opportunities to consider where partnership working and joint
initiatives may be developed between the council and the ALEO in support of The Plan
for North Lanarkshire. 
2.30. Senior officers from all ALEOs completed the council’s annual Assurance Statement
and Checklist which is used to inform the Annual Governance Statement in the
council’s annual accounts. 
2.31. ALEOs themselves contribute to this report through the submission of a six monthly
risk and assurance update template and the key elements from these in relation to
governance, staffing, risk management and business continuity arrangements are 
captured at Appendix 3. Again, while Panel members may take assurance from this
information, there are a small number of ongoing and future developments, singled out
below, which require careful monitoring over future reporting periods. 
2.31.1. Implementation of the Enterprise Project from early 2024 and the impact of
this, including the outcomes from the procurement exercise currently
underway, on the existing joint venture partnership arrangements in place
through Amey Public Services LLP and MEARS (Scotland) LLP. 
2.31.2. North Lanarkshire Partnership’s refinancing activity and future borrowing
obligations. 
2.31.3. Potential revisions to the Articles of Association for both Fusion Assets Ltd and
Routes to Work Ltd with the latter also potentially seeking to increase the
number of trustees/directors serving on the Board. In both cases, details of the
proposed changes to the respective Articles of Association will be considered
by the Enterprise and Fair Work Committee. The Enterprise and Fair Work
Committee will also be required to consider potential additional appointments
to the Routes to Work Board of Directors. 
3. Measures of success 
3.1. The following measures of success are highlighted for Panel members’ consideration: 
• Arm’s length service delivery providers continue to deliver high quality public
services that achieve Best Value for the council. 
Page 224 of 240

Page 229

• Effective and timely monitoring and reporting to relevant service committees and
this Panel provide assurance to the council that adequate governance, financial
and risk management procedures are operating effectively in each of the ALEOs. 
• Panel members have adequate assurance that the council is fulfilling its ‘Following
the Public Pound’ obligations and the externalised service delivery mechanisms
are delivering services as per the council’s requirements and expectations with
minimal risk to the council, or effectively managing risks where such are
unavoidable. 
• Robust due diligence and legislative compliance continue to be prioritised in the
winding-up and subsequent applications for strike-off in respect of Culture and
Leisure NL Ltd and NL Leisure Ltd. 
• Effective completion of North Lanarkshire Properties LLP’s refinancing activity with
the final loan agreement and the company’s future borrowing reflecting the most
advantageous terms and best value. 
4. Supporting documentation 
4.1. Appendix 1:  Summary of in-scope ALEOs and Joint Venture Partnerships
4.2. Appendix 2:  Statutory Bodies: Associates and Joint Ventures
4.3. Appendix 3:  ALEOs and Strategic Partnership Vehicles: Governance, Operational   
Delivery and Risk Management Assurance 
Katrina Hassell
Chief Officer (Business and Digital)
Page 225 of 240

Page 230

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
5.2.1 
5.2.2
If Yes, please provide a brief summary of the impact? 
Financial management within the ALEOs is reported to the service committees, as
outlined in Appendix 1, every six months. An annual oversight report provides a
high level summary of the statutory bodies’ performance since these are subject to
external scrutiny and reporting within in their own right. 
The contractual arrangements in place between each ALEO and the council
require the individual companies to submit monthly management accounts and
additional information such as Business Plans and annual accounts to the council’s
Finance Service enabling officers to assess and report any financial risk likely to
arise as a result of the council using the ALEO to deliver these services. Financial
governance, including any potential risks are reported to this Panel by exception
allowing members to identify any additional controls which require to be
implemented in addition to continued financial monitoring by the individual ALEOs
and Financial Solutions.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
5.4.1 
If Yes, please provide a brief summary of the impact? 
North Lanarkshire Properties LLP Refinancing 
There are legal considerations and obligations on NLP in finalising the terms of the
loan agreement with the preferred lender and NLP has procured external legal
Page 226 of 240

Page 231

5.4.2
advice to advise the Management Committee during the final negotiations and
ultimate execution of the loan agreement. The Council has also procured external
specialist legal advice to provide guidance as required in relation to its position as
guarantor. 
Fusion Assets Ltd and Routes to Work Ltd – Potential Changes to Articles of
Association 
There are legal considerations for the council as sole shareholder when reviewing
potential changes to company Articles of Association and solicitors from the
Contracts and Commercial team within Legal and Democratic are engaging with
both companies, which also have their own specialist legal advisors. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
5.9.1
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
The Assurance and Risk templates completed by the ALEOs, plus separate
monitoring by the Client Officers and Link Officers confirm that risk management
arrangements are in place and reported to the individual ALEO’s Board or
Page 227 of 240

Page 232

Management Committee. The Risk Register for Business and Digital includes a risk
linked to maintaining robust monitoring and scrutiny of service delivery by an ALEO
and this is reviewed regularly by the management team. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
Routes to Work Ltd supports young people under 18 into employment, training and
positive destinations. As such, the requirement for a Children’s Rights and
Wellbeing Impact Assessment will be considered through separate performance
and/or funding reporting to the Enterprise and Fair Work Committee. 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 228 of 240

Page 233

Appendix 1
Summary of in-scope ALEOs and Joint Venture Partnerships 
WHOLLY OWNED ALEOs BOARD OF DIRECTORS COMPOSITION SERVICE COMMITTEE AND REPORTING
Routes to Work Ltd:
Incorporated as a limited
company with charitable
status. Council is sole
shareholder (100%). 
Maximum of up to 10 directors of whom:
• Up to 2 are Category A Directors (1 elected member & 1 chief
officer) appointed by NLC;
• Up to 8 are Category B Directors representative of local
community or possessing key skills / experience
Enterprise and Fair Work Committee. Operational and
Financial Performance information covering the period Q2
(2021/22) and up to Q3 (2022/23) was reported on 12/05/23.
Click on link for copy of report 
NLC representatives appointed to serve on the Routes to Work Board: Provost Cllr K Duffy and Chief Officer (People Resources) 
Fusion Assets Ltd:
Incorporated as a limited
company. Council is sole
shareholder (100%). 
Maximum of up to 8 directors of whom:
• Up to 5 are Partner Directors (3 elected members & 2 chief
officers) appointed by NLC;
• Up to 3 are Co-opted Directors possessing key
skills/experience
Enterprise and Fair Work Committee. Operational
performance during 2022/23 to 31 March 2023 and financial
performance from 01/04/22 to 31/12/22 was reported on
12/05/23. Click on link for copy of report. 
NLC representatives appointed to serve on the Fusion Board: Councillors B McCulloch; L Roarty; and R Sullivan, plus Chief Officer (Finance) and Chief
Officer (Place) 
North Lanarkshire Properties
LLP: Incorporated as a limited
liability partnership with 2
members:
NLC owns 99.999% shares
and NL Property Investments
Ltd holds a 0.001% shares.
Maximum of 6 Management Committee members:
• 5 representatives are appointed by NLC (4 elected members
and 1 chief officer);
• 1 representative is appointed by NL Property Investments Ltd
Finance and Resources Committee Operational performance
from 28/07/22 to 11/01/23 plus 2022/23 financial performance
as at 06/01/23 was reported on 24/05/23. Click on link for copy
of report.
NL Property Investments
Ltd: Incorporated as a limited
company. Council is sole
shareholder (100%).
Incorporated as a limited company. Council is sole shareholder
Maximum of 6 directors appointed by NLC (5 elected members
& 1 chief officer being the same individuals as those
referenced above)
Finance and Resources Committee (Limited separate
reporting requirement since business is transacted through the
LLP above.)
NLC representatives appointed to serve on the NLP Board and Management Committee: Provost Cllr K Duffy; and Councillors T Fisher; G Robinson;        
R Sullivan; S Watson, and Chief Officer (Housing Property Services)  Page 229 of 240

Page 234

JOINT VENTURE PARTNERSHIPS WHERE NORTH LANARKSHRIE COUNCIL HAS 33.33% SHAREHOLDING
STRATEGIC PARTNERSHIP
VEHICLES MANAGEMENT COMMITTEE COMPOSITION  SERVICE COMMITTEE
Amey Public Services LLP:
Incorporated as a limited
liability partnership with Amey
LG Ltd holding a 67%
shareholding and NLC holding
a 33% shareholding 
• 5 representatives with 3 appointed by Amey LG Ltd and 2
appointed by NLC (1 elected member and 1 chief officer)
Environment and Climate Change Committee Operational
performance for the period 01/10/22 to 31/03/22 and financial
performance at 31/12/22 was reported on 3 May 2023. Click
on link for copy of report.
NLC representatives appointed to serve on the Amey Management Committee: Councillor M McPake and Chief Officer (Community Operations) 
MEARS Scotland LLP:
Incorporated as a limited
liability partnership with
MEARS plc holding a 67%
shareholding and NLC holding
a 33% shareholding
• 5 representatives with 3 appointed by MEARS plc and 2
appointed by NLC (1 elected member and 1 chief officer)
Housing Committee Operational performance for both
housing and corporate property repairs covering the period
01/04/22 to 30/11/22 and financial performance at 30/09/22
was reported on 15/02/23. Click on link for copy of report.
NLC representatives appointed to serve on the MEARS Management Committee: Councillor M Coyle and Chief Officer (Housing Management) 
Page 230 of 240

Page 235

Appendix 2
Statutory Bodies: Associates and Joint Ventures 
STATUTORY
PARTNERSHIPS
OBJECTIVES / SERVICES DELIVERED  BOARD OF DIRECTORS
COMPOSITION  SERVICE COMMITTEE
Lanarkshire Valuation Joint
Board: Established by the
Valuation Joint Boards
(Scotland) Order 1995 to
allow for the valuation
functions of North and South
Lanarkshire Councils to be
discharged jointly following
local government
reorganisation in 1996.
The Assessor and Electoral Registration Officer is
responsible for preparation and maintenance of the:
• Register of Electors which is published at least annually;
• Valuation List - listing all heritable properties within
Lanarkshire for Council Tax purposes; and, 
• Valuation Roll - public document containing an entry for
all non-domestic properties in Lanarkshire except those
specifically excluded by law and includes the Rateable
Value.
The Board also acts as a Joint Committee responsible for
the electoral registration duties of both authorities.
• 16 members: 8 from North
Lanarkshire Council and 8 from
South Lanarkshire Council. 
Finance and Resources
Committee 2020/21 Annual
Oversight Report reported to
Finance and Resources
Committee on 10 March 2022. 
NLC representatives appointed to serve on the LVJB Board of Directors: Councillors B Burgess; K Duffy; M Hughes; L Jarvie; T Johnston; A McVey; J
Reddin; A Thomas. Substitutes: Cllr N Shevlin and any SNP Member 
Strathclyde Partnership for
Transport (SPT):
Established under the
Transport (Scotland) Act
2005. 
SPT has a statutory duty to develop a transport strategy
for its region taking account of:
• Demographics and meeting all inhabited places’ needs;
• Enhancing social and economic well-being; and
• Promoting public safety and sustainable development.
SPT subsidises socially necessary bus services,
operates bus stations and the Glasgow subway. SPT
maintains bus shelters and administers ticketing
including the ZoneCard.
• 20 elected members representing
the 12 local authorities in the West
of Scotland and up to 9 appointed
members.
Environment and Climate
Change Committee
2021/22 Annual Oversight Report
reported on 3 May 2023 (Click on
link)
NLC representatives appointed to serve on the SPT Board of Directors: Councillors G Currie; M McPake; A Smith. Substitutes: Cllrs H Loughran and J Keltie 
• Strathclyde Concessionary
Travel Scheme Joint
Committee. The Transport
Act 1985 allows transport
authorities to make
concessionary transport
schemes. 
• Strathclyde Concessionary Travel Scheme Committee
was set up in 1999 to determine concessionary fares
and criteria applicable for concessionary travel on
subway, rail services and on ferry services within the
Strathclyde scheme area.
• Administers concessionary travel for the over 60s and
disabled people (and in certain cases, concessionary
travel for companions).
• One member (and one substitute
member) from each of the 12
constituent councils with the SPT
area plus the Chair of SPT.
Environment and Climate
Change Committee
2021/22 Annual Oversight Report
reported on 3 May 2023 (Click on
link)
NLC representatives appointed to serve on the SPT Concessionary Travel Scheme: Councillor W Goldie  Page 231 of 240

Page 236

STATUTORY
PARTNERSHIPS
OBJECTIVES / SERVICES DELIVERED  BOARD OF DIRECTORS
COMPOSITION  SERVICE COMMITTEE
North Lanarkshire Health and
Social Care Integration Joint
Board. Established under the
Public Bodies (Joint Working)
(Scotland) Act 2014 and
designed to improve adult
health and care services
through better integration and
more joined-up support and
care, particularly for people
with complex or multiple long
term conditions. 
Responsible for planning and delivering all community
based adult health and social care services across North
Lanarkshire. For example:
• Health visiting and district nursing
• Community addiction services
• Mental Health and Learning Disability services
• Adult Social Work Services
• Adult protection 
• Home Support Services 
• Community paediatrics and children’s health services 
The functions delegated by North Lanarkshire Council
(NLC) and NHS Lanarkshire (NHSL) are detailed in an
Integration Scheme which must be approved by Scottish
Ministers.
• 8 voting members – 4 elected
members and 4 non-executive
directors appointed by NHS
Lanarkshire.
• Senior officers attend in a non-
voting capacity along with
representatives for staff, the third
sector, service users and carers.
Adult Care and Social Work
Committee 
Adult Social Care 2022/23
Performance Reports:
Q 2 (01/07/23 to 30/09/23) –
reported on 21 February 2023
(Click on link) 
Q3 (01/10/23 to 31/12/22)
reported on 16/05/23 (Click on
link) 
Revenue and Capital Budget
Monitoring reports are also
reported at each cycle (Click on
link for Financial Monitoring
Report as at P12 01/04/22 to
03/03/23)
NLC representatives appointed to serve on the Health & Social Care IJB: Councillors C Barclay; B Burgess; P Kelly; M McCulloch 
Page 232 of 240

Page 237

Appendix 3
ALEOs and Strategic Partnership Vehicles: Governance, Operational Delivery and Risk
Management Assurance 
ROUTES TO WORK (RtW) LIMITED
Governance and Client Service Liaison
• In person Board meetings have occurred as planned in the first half of 2023/24 with a schedule in place,
including the company AGM on 21 September 2023, to 31 December 2023.
• Quarterly Finance, Governance and HR Sub Groups continue to meet midway between Board meetings.
• Regular liaison with Client Service – Employability Support and Skills Development in Education and
Families
• Induction training for Councillor Duffy was completed in February 2023.
• Directors approved the 2023/24 annual budgets; associated activity; and human resource requirements at
the Board meeting on 22/06/23. This was slightly later than usual due to interim funding arrangements
being put in place for April to June pending the announcement of UK and Scottish Government
investments for 23/24. 
• RtW’s annual good governance action plan for 23/24 was also approved at the June  Board meeting. This
incorporates a review of the Articles of Association to ensure they remain fit for purpose and to consider
seeking to increase the maximum number of Trustees/Directors. RtW has experienced some recent
difficulties in spreading the governance workload and holding quorate meetings due to the increasing
personal and professional demands of current Board members. Any proposed changes to the Articles of
Association will require consideration through the Enterprise and Fair Work Committee in due course.
• One existing Board member is required to stand down at the AGM due to completion of his three-year term
of office, however he has indicated his interest in being re-appointed and this matter will be considered by
the Enterprise and Fair Work Committee at its next meeting. Two other Directors have indicted their
intention to stand down at the AGM and arrangements are in place to advertise these Board vacancies.
Recommendations on these appointments will require to be considered by the Enterprise and Fair Work
Committee and discussion is ongoing with RtW on the timing of this report. 
Summary of Recent Service Delivery - January to June 2023
• ‘Business as usual’ service delivery with public offices open and community outreach facilities in use.
• Increased delivery to schools during the period as RtW assisted NLC in providing further support for
Christmas leavers and preparing summer leavers towards attaining positive destinations.
• Participation by RtW staff in council and partners’ Cost of Living events across the area to identify the
benefits and support individuals into work and fair work as a route out of poverty
• RtW hosted its own event on 30/06/23 in Bellshill YMCA. Highlighting ERSA2 Employability Day. Providing
a range of information to assist residents with support to alleviate the effects of the cost of living crisis,
partners included: Home Start Scotland; Citizens Advice Scotland; Social Security Scotland; Home Energy
Scotland; and, Lanarkshire Community Food and Health Partnership. 
Summary of Planned Service Delivery – July 2023 to March 2024
• RtW’s service delivery has been updated to reflect new funding streams active from July 2023.
• Rollout of RtW’s 2023/24 Operational Plan (representing the final year of the charity’s 2021/24 Strategic
Business Plan)  has been slightly delayed due to funding uncertainties and the recruitment activity
described below. The Plan is now being developed and will incorporate a review of the Strategic Business
Plan to identify any as-yet unachieved ambitions for inclusion in this final year Operational Plan.
• RtW will issue a tender over the summer for consultancy support to assist the Board and Senior
Management Team in developing their next three-year business plan for the period 2024 to 2027. 
Staffing:
• Hybrid working, in place since November 2022, permits staff to work up to 40% of their weekly working
hours flexibly (managed over a 4-week reporting period in line with existing flexi-time arrangements). This
arrangement will be reviewed in the autumn this year.
• Directors considered and agreed arrangements around the 2023 pay award at their meeting in June.
Recognising the wide-ranging cost of living pressures being felt at the moment, Directors were keen to
ensure that ongoing negotiations on the local government settlement did not adversely affect RtW staff and
accordingly approved a 5% increase backdated to 1st April and paid in July 2023. The Board also 
2 Employment Related Services Association is the is the national membership body for employment support providers including
charities, small specialist organisations, local authorities, housing associations and health institutions. ERSA campaigns for high
quality services for the UK's jobseekers and low earners. 
Page 233 of 240

Page 238

committed to monitor the local government pay negotiations and will review the rate of increase payable to
RtW staff should there be a significant difference between this current level and the eventual local
government settlement rate.
• RtW’s approved activity in 2023/24 results in a revised project delivery headcount of 81.6 FTEs for 23/24
and an internal and external recruitment exercise will be undertaken from mid-July onwards following a
staff briefing on 13/07/23. Corporate support and Senior Management Team structures remain unchanged.
• Following some recruitment difficulties in appointing the temporary position of Finance Manager and the
permanent position of Finance Team Leader, RtW has now filled both posts in March and April 2023,
having engaged specialist recruitment agencies, and all finance functions have resumed. 
Risk Management 
RtW’s Risk Register is reviewed quarterly by the Senior Management Team and discussed at the Governance
Sub-Group. A Risk Management report, identifying any new risks; the severity and proximity of existing risks;
and where a risk no longer poses a threat, is considered at each Board meeting. A full review of the Risk
Register was completed in April 2023 and approved by the Governance Sub Group before being reported to
the Board in June. 
Top 5 Risks
Inability to achieve
reserves policy
Underperformance
on key contracts
Loss of key
management or
operational personnel
Lack of long
term funding
Inability to provide full
range of financial
functions
Business Continuity
Two business continuity issues, linked to premises, have arisen and are impacting on service delivery:
• Water ingress in the Craigneuk premises (formerly Craigneuk Library) ; and,
• Connectivity issues in Airdrie Business Centre 
Both premises are leased from North Lanarkshire Properties and discussion is underway regarding repairs,
and likelihood of a reoccurrence to the building in Craigneuk and, to resolve the connectivity issue in Airdrie. 
Service Developments / Highlights - Support for Parents - Newmains
A new place-based service for economically inactive residents from Newmains went live in July 2023, with a
particular focus on parents in poverty. The service will be targeted and intense for 6 months and will then
move on to another agreed area in North Lanarkshire. 
Page 234 of 240

Page 239

NORTH LANARKSHIRE PROPERTIES (NLP) LLP
Governance and Client Service Liaison
• Management Committee meetings have taken place, generally as scheduled, however the meeting due to
take place on 17/05/23 was brought forward by one week to 10/05/23 to ensure alignment with the
Refinancing Project Plan timeline and a special meeting was convened on 20/06/23, to consider the
preferred lender and seek relevant council permissions (under authority previously delegated to the Chief
Officer (Finance) ) in advance of the council recess.
• The council has made a number of changes to the elected members who are appointed to represent the
council on the Management Committee and the Strategic Asset Manager, who provides strategic business
support to NLP under the Service Level Agreement in place between the council and the company, has
provided induction briefings.
• Regular engagement is in place with the Client Service and the Client Liaison Officer from Asset and
Procurement through the Service Level Agreement.
Summary of Recent Service Delivery - January to June 2023
• ‘Business as usual’ service delivery in place with the hybrid working model ensuring that office and onsite
requirements can be met.
• The requirement to refinance the company’s existing borrowing by 31/10/23 has placed additional
responsibilities on the NLP staff team particularly in relation to the provision of information for prospective
lenders on the property portfolio, asset valuations and tenancy profiles. This has necessitated some
additional expenditure through the overtime budget, however, these costs are included within the overall
earmarked funds to support the refinancing activity. 
Summary of Planned Service Delivery – July 2023 to March 2024
• Conclude refinancing and complete loan agreement terms with the preferred lender with the finalised
agreement in place by the deadline of 31/10/23.
• Finalise the company’s 5 year Investment Plan. 
Staffing:
• NLP has a staffing establishment of 15 FTEs and the employees’ Terms and Conditions reflect those within
the council.
• Strategic Business Management support plus a range of professional and support services including Legal
services, financial management, facility support services, surveying and cartographic services are provided
and charged for by the council under a Service Level Agreement.
• Hybrid working, introduced in April 2022, requires employees to undertake a minimum of 2 office days each
week.  This hybrid model works well for NLP as there is a natural requirement for a combination of office
and on site delivery associated with the majority of the roles. 
Risk Management 
Risks are reviewed quarterly by the Management Committee. North Lanarkshire Properties (NLP) are
continuing to be affected by supply chain labour shortages and inflationary pressures which have impacted the
property and construction industry in recent months. There is a potential risk that these delays will impact on
the timescales relating to re-letting properties. The current top five risks are summarised below. 
Top 5 Risks
IT Systems and
Software – Failure
of main reporting
and management
systems; and failure
to collect rent
Business
continuity
management:
Staff Resources –
Loss of staff
Planning and
Resources:
Financial –
Reduction in
income due to
pandemic and/or
cost of living crisis
Planning and
Resources:
Strategic Change
– Failure to align
new strategies to
changes in market
conditions
Planning and
resources:
Financial – Inability
to make loan
repayments; and/or
change in bank
covenant.
Business Continuity
Continuity of service was maintained throughout Covid as a consequence of the business’s ability to deal with
transactions digitally and adopt new processes to complete contractual requirements where necessary and
these are continuing as appropriate. 
Service Developments / Highlights   
• The joint NLP and council project team established to support the company with refinancing activity is
making good progress and all actions are on track. Page 235 of 240

Page 240

FUSION ASSETS LTD
Governance and Client Service Liaison
• Board of Directors meetings have taken place as scheduled with future dates in place to the end of 2023.
Meetings have returned to in-person.
• Councillor Roarty has recently been appointed to the Board by the council and an induction pack along
with visits to Fusion sites and potential development opportunities will be arranged.
• Fusion’s Managing Director and the Chief Officer (Place) held a briefing session on the background to
Fusion, the company’s remit and current developments for elected members on 20 April 2023 which was
well attended.
• Revisions to the company’s Articles of Association are being developed in discussion with the council.
Details of these will be submitted to a meeting of the Enterprise and Fair Work Committee in due course.
Summary of Recent Service Delivery - January to June 2023 
• ‘Business as usual’ service delivery in place from Fusion Assets’s office in the Muirfield Community Centre. 
• Two of the three newly constructed industrial units at Gartcosh are now occupied with the remaining larger
unit being actively marketed. A further phase of enabling infrastructure works has been completed at
Gartcosh Industrial Park to prepare the land for development.
• Following the sale and completion of the new Co-Op facility at Link Park, Newhouse, Fusion Assets have
begun work on the construction of a second unit which will be net zero carbon enabled and incorporates a
range of energy saving features. 
Summary of Planned Service Delivery – July 2023 to March 2024
• Planned developments for 2023 include the creation of a new joint venture company at Eurocentral to
construct a speculative multi-let industrial scheme at Condor Park and completion and letting of the second
industrial building at Link Park, Newhouse which is currently under construction. 
• Construction costs continue to rise (in part impacted now by rising energy /production costs) coupled with
higher borrowing costs which means that viable speculative development continues to be challenging,
however, with an overall lack of supply across North Lanarkshire for modern building premises, demand
remains consistently high. This is encouraging and provides a degree of optimism as there is continuing
interest both from existing local companies looking to expand and new inward investors keen to locate into
the area.
Staffing:
• Fusion Assets directly employs the post of Managing Director and a Development Manager, employed by
Enterprise and Communities’ Place division, is seconded to the company.
• A hybrid working arrangement is in place with staff spending on average three – four days a week in the
office in Cumbernauld. 
Risk Management 
Corporate Risk Reports, based on the Figtree management system used by the council, are presented to the
Board on a regular basis. At the Board meeting on 12/06/23 Directors noted a new short-term risk linked to
winding up a former Joint Venture company and this is now included in the company’s top five risks listed
below. 
Top 5 Risks
Programme
delivery
Property
acquisition
Contracts and
procurement risks
Accessing adequate
financial resources
Winding up joint
venture
Business Continuity
There have been no business continuity issues over the past six months. 
Service Developments / Highlights   
• As well as jobs and investment in the local area, Fusion Assets has incorporated community benefits
clauses into the infrastructure works contract at Gartcosh and the building construction contract at
Newhouse. This has seen the contractors engage with the council’s Education and Families division to
provide pupils with practical work experience as well as students on construction related courses at New
College Lanarkshire.
Page 236 of 240

Page 241

AMEY PUBLIC SERVICES (APS) LLP
Governance and Client Service Liaison
• Management Committee meetings have returned to in person and have occurred as planned in the first
half of 2023/24 with a schedule in place to 31 December 2023.
• Monthly Client Liaison contract monitoring meetings between APS and NLC Senior Management Teams,
• Fortnightly meetings, focussing on Capital projects being delivered by APS, also introduced.
• Regular communication between APS and NLC Finance Team with plans to reintroduce a more formal
quarterly meeting to be held one week prior to each Management Committee meeting
Summary of Recent Service Delivery - January to June 2023 
APS continued to deliver routine and cyclic maintenance operations as listed below. 
• Road and footway surfacing and patching programmes.
• Dark lamp repairs and electrical civils works.
• LED lantern installations.
• Routine maintenance activities (e.g. emergency response and repair, electrical testing, defect repairs,
cyclic gully cleaning, road markings, flooding issues).
• Enhanced standby resources and winter service operations.
• Road improvement works at various locations. 
The 2022/23 programme of carriageway surfacing and roads and footways patching programmes was
completed and the winter services were delivered without any issues being identified or raised. 
Capital projects during the reporting period included:
• Installation of around 7,000 LED lanterns to date as part of a wider install programme of 9,000. This is due
for completion by the end of this summer.
• Improvements works at Woodside junction, Coatbridge which included traffic island construction,
installation of new traffic signals and carriageway and footpath resurfacing works.
• Installation of new speed limit signing and road lining works in Airdrie, Plains and Caldercruix.
• Ongoing footway widening works and street lighting between Newhouse and Salsburgh. 
• Construction of high access kerbs at 36 bus laybys in Airdrie and Caldercruix. 
Summary of Planned Service Delivery – July 2023 to March 2024 
The 2023/24 programme of carriageway surfacing; roads and footways patching programmes; routine and
cyclical maintenance works; and winter preparedness is underway. 
Staffing:
• APS operational staff (frontline, supervisors & depot managers) continue to be depot-based on a full-time
basis.
• Majority of remaining staff are now mainly office based with some part-time home-based working continuing
depending on personal requirements/circumstances. 
Risk Management
The Partnership Risk Register is reviewed as required at the monthly Client Liaison meetings. Any issues or
risks which need to be escalated to the Management Committee are included in the Committee papers for
discussion. 
The APS risks remain largely unchanged since the previous report, however a new risk has been identified in
relation to work planning and scheduling by the council.
Top 5 Risks
Insufficient
Revenue and
Capital budgets
from the council
to maintain APS
resource levels,
productivity and
utilisation.
Continuing labour
market pressures and
competition attracting
frontline staff from
APS with higher
wages and similar
difficulties in attracting
new entrants.
Requirement to try
and develop additional
workstreams (either
from within the council
or externally) to offset
any council budget
constraints/reductions.
Ongoing
inflationary
pressures resulting
in materials costs
increases which
have not been fully
reflect in contact
indexation criteria.
More reactive work
tickets being
issued by NLC
rather than
planned works
impacting on most
efficient use of
resources.
Business Continuity
Although there are no significant business continuity issues at present, the ongoing conflict in Ukraine, energy
costs and other global issues such as the residual impact from COVID has significantly impacted on the cost Page 237 of 240

Page 242

of a number of materials. These are monitored on an ongoing basis and any impacts reported and discussed
at the Client Liaison meetings (and Management Committee meetings as necessary).
Service Developments / Highlights - ADEPT Live Labs 2 Award 
The council, APS and Transport for the West Midlands were successfully chosen as one of 7 UK wide projects
selected to examine opportunities for the long-term decarbonisation of roads materials. The plan is to create a
UK centre of excellence and centralised research and innovation hub to consider alternative materials which
could be used for road surfacing, crash barriers, bridges, lighting columns and landscaping. A testing facility,
simulating real life road and weather conditions, will examine how waste products, such as plastics, concrete
and other demolition materials, could be recycled and utilised. 
ADEPT Live Labs 2 programme announced – seven projects to start in 2023  
£4.5m Centre of Excellence for North Lanarkshire | North Lanarkshire Council 
Page 238 of 240

Page 243

MEARS (SCOTLAND) LLP
Governance and Client Service Liaison
• The Management Committee meeting scheduled to take place in May was postponed and the next
meeting will now take place on 29/08/23.
• A series of meetings are in place with the council including four weekly Client Liaison meetings; monthly
Finance Liaison meetings; and regular Service Improvement and Customer Success Improvement Group
meetings.
Summary of Recent Service Delivery - January to June 2023 
• Continued delivery of the housing and corporate property repairs contract with the Year 2 extension ending
on 21/01/23 and the final, Year 3 extension, covering the period 22/01/23 to 21/01/24, approved by the
Housing and Regeneration Committee on 16/02/22. 
• Extreme weather conditions and severe frosts in late 2022 resulted in an additional 4,000 job lines over the
two week period due to frozen and burst pipes and the resultant ceilings collapsing, wall and floor
saturation. The council and MEARS activated the Emergency Response Plan and Senior Joint Team to
deal with the emergency repairs including damage to void properties. Approximately 80 households were
decanted with many more staying with family/friends. 
Summary of Planned Service Delivery – July 2023 to January 2024 
• The Joint Venture Partnership between MEARS and the council has entered the final year of the contract
extension which will see the contract through to early 2024.   
Staffing:
• Apprenticeship Recruitment Campaign launched March 2023 to onboard 20 craft apprentices. 
• Workforce planning for the future underway reflecting age profile of the workforce, succession planning and
future delivery requirements.  
• Digital Champion Initiative launched with an employee forum established to upskill key personnel across all
workstreams to optimise the use of MEARS systems, new technology and enhance business continuity.  
• Training and Development Manager recruited to develop local strategy and approach to ensure MEARS
workforce reflects the communities that the company operates within.  One of the key areas of focus is to
engage with organisations and work with underrepresented groups to help promote construction
apprenticeships.
• Full review, including engagement with staff, of Employee Benefits, particularly those which can assist staff
during the Cost of Living crisis. Outcomes include:
• Reintroduction of the Employee Wellbeing Fund, designed to support staff who are suffering financial
hardship.
• Staff discounts via Reward Gateway (financial savings across a range of retailers including all major
supermarkets, utilities companies, insurance and financial services). 
• Cycle to Work Scheme
• Employee Assistance Programme which offers compassionate guidance 24/7 covering a wide range of
issues. 
• MEARS Communication Strategy ensures that Employee Benefits, and all other benefits, are promoted
amongst the workforce through multiple points of contact including the company intranet page, secure
email distribution list and face to face meetings. 
Risk Management 
MEARS Management Committee members monitor, review and manage risks on a quarterly basis and a
range of specific controls are in place for each of the risks identified below which are largely unchanged from
the previous period.
Top 5 Risks
Failure to have
robust Health and
Safety procedures
& controls. Impact
of Risk
Management
Failure: 
• Non-compliance
with legislation.
Resource Supply:
• Labour –
attraction and
retention of
suitably qualified
labour;
• Material – Market
pressures on
price;
• Subcontractors.
Partnership
Finance:
• Final contract
year;
• Demobilisation;
• Council award of
Enterprise
Project.
Failure to comply
with Data
Protection
legislation.  
Impact of Risk
Management
Failure: 
• Fines up to 4%
of Group
Turnover;
Failure to provide
market competitive
/comparable T&Cs
and pay rates. Impact
of Risk Management
Failure: 
• Poor staff retention
• Negative impact on
service and failure Page 239 of 240

Page 244

• Financial
penalties - HSE
fine;
• Reputational
damage;
• Employee
disengagement/
concern around
Mears values as
an employer.
• Potential for
criminal action;
• Reputational
damage / loss of
confidence in
the sector.
to meet demand
due to vacant posts
• Not perceived as an
employer of choice
by applicants.
Business Continuity
No business continuity issues in the period 
Service Developments / Highlights - ‘Pathway to Net Zero’ 
MEARS has launched its ‘Pathway to Net Zero’ strategy, setting out company ambitions to significantly reduce
energy consumption and carbon emissions across the Group.  The strategy outlines the ambition to reduce
emissions by 90% by 2030 through five key themes: Culture; Green Travel and Transport; Climate Conscious
Service Delivery; Efficient Buildings and Sustainable Procurement; and Supply Chain solutions. Planning will
take place during the latter quarter of this year to identify further actions required to achieve net zero by 2045.   
Page 240 of 240