North Lanarkshire Council
Report
Audit and Scrutiny Panel 
Does this report require to be approved? ☒ Yes   ☐ No
Ref KH/SL Date 29/06/23 
Strategic Governance Framework - annual review and refresh 
From  Katrina Hassell, Chief Officer (Business and Digital)  
E-mail HassellK@northlan.gov.uk Telephone 07903 096 121 
Executive Summary
Good governance enables the council to effectively pursue the ambition set out in The Plan
for North Lanarkshire within appropriate controls and the management of risk.  It is also
central to ensuring effective scrutiny and delivery of statutory Best Value obligations.  This
means ensuring resources are directed in line with agreed policies, priorities, and project
management procedures, and there is sound and inclusive decision making and clear
accountability for the use of those resources in achieving improved outcomes for service
users and communities. 
Reflecting the principles in the national Delivering Good Governance in Local Government:
Framework, the council’s local code of governance is set out in the Strategic Governance
Framework which was initially approved in February 2020 and subsequently refreshed and
approved by the Audit and Scrutiny Panel annually thereafter.   
The Delivering Good Governance in Local Government: Framework requires that each
year councils test their arrangements against the good governance principles by carrying
out a review of existing arrangements, ensuring their local code is up to date, and reporting
on compliance.  In this respect the Strategic Governance Framework (and more specifically
the list of supporting elements and mechanisms in Appendix B) has been reviewed and
updated and is presented herewith for Audit and Scrutiny Panel approval in line with the
Panel’s role - as set out in the Scheme of Administration - to “provide independent
assurance to the council and those charged with governance on the adequacy of the
council's risk management framework and internal control environment”. 
The annual review process, and refreshed Strategic Governance Framework, is a key
piece of evidence used to inform the development of the Annual Governance Statement
for 2022/23. 
Recommendations
It is recommended that the Audit and Scrutiny Panel: 
(1) Acknowledge the annual review which has been undertaken to refresh the Strategic
Governance Framework and ensure each of the elements and mechanisms listed
therein (as noted in Appendix B) are up to date, and on a review programme to be
updated at an appropriate interval and reported to the relevant committee,
(2) Continue to carry out their role in respect of the Strategic Governance Framework in

Page 2

1. Background 
1.1 The council is required to demonstrate its commitment to the good governance
principles set out in the national Delivering Good Governance in Local Government:
Framework (2016) and accompanying Guidance Notes for Scottish Local Authorities
(2016) published by Chartered Institute of Public Finance and Accountancy (CIPFA) in
association with Society of Local Authority Chief Executives (SOLACE).   
1.2 To ensure compliance with these principles, the council is required to determine its own
governance structure (local code) underpinned by the Delivering Good Governance in
Local Government: Framework. The council’s local code of governance in this respect
is set out in the Strategic Governance Framework in Appendix 1.   
1.3 The Strategic Governance Framework brings the principles of good governance
together with legislative requirements and management processes by which the council
is directed and controlled and through which it is accountable to, engages with, and
leads the local community.  This aims to ensure the council is able to effectively pursue
the long-term ambition set out in The Plan for North Lanarkshire, while ensuring this is
underpinned with control and the management of risk, and: 
• Resources are directed in accordance with agreed policies and according to
priorities and in line with corporate project management procedures.
• There is sound and inclusive decision making.
• There is clear accountability for the use of those resources in achieving defined
outcomes for service users and local communities. 
1.4 All councils are required to test their governance arrangements (local code) against the
7 principles, 21 sub principles, and 91 behaviours and actions that demonstrate good
governance in practice which are contained within the Delivering Good Governance in
Local Government: Framework, by: 
• Reviewing existing governance arrangements.
• Developing and maintaining an up to date local code of governance that takes into
account the environment within which it operates and includes arrangements for
ensuring ongoing effectiveness.
• Reporting publicly on compliance with the local code on an annual basis, including
how the governance arrangements have been monitored for effectiveness in the
year and identifying planned changes. 
1.5  An annual review process is in place to fulfil the requirements set out in paragraph 1.4
above.  This is depicted in Figure 2 in the Strategic Governance Framework which is
attached as Appendix 1.  The accompanying Annual Governance Statement report to
the Audit and Scrutiny Panel contributes to fulfilling these requirements in that it reports
on the annual process to review existing governance arrangements to ensure ongoing
terms of providing independent assurance to the council and those charged with
governance on the adequacy of the council’s risk management framework and internal
control environment, and
(3) Approve the refreshed Strategic Governance Framework. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements

Page 3

effectiveness. 
1.6 In practice, governance comprises the combination of structures, strategies, policies,
plans, frameworks, systems, processes, rules, codes, procedures, cultures, and values
that are used to direct, control, and manage a local authority’s operations and activities. 
These define roles and responsibilities and accountabilities and establish mechanisms
to enable a local authority to pursue its vision effectively and ensure that the vision is
underpinned with control and the management of risk.  The list of items referred to in
this paragraph are hereinafter referred to as elements and mechanisms.   
1.7 The Strategic Governance Framework outlines the list of elements and mechanisms
that demonstrate the council’s compliance with the 7 principles, 21 sub principles, and
91 behaviours and actions contained within the national Framework.  It should be noted
that the list of elements and mechanisms (in Appendix B) does not introduce new items
of governance to the council, rather its purpose is to collate all existing items (produced
by the respective Chief Officer) into the one local code for annual review, assessment,
assurance, and reporting purposes. 
1.8 The annual assessment process in place through the Strategic Governance Framework
and its accompanying review programme has been recognised as an area of good
practice in the latest two annual Internal Audits on Corporate Governance.  In May 2023
it was cited that there are “formal and generally robust arrangements in place to ensure
that such reviews are undertaken on an annual basis”.   
1.9 Chief Officers and Elected Members are responsible for determining and implementing
the council’s governance arrangements and ensuring the local code is assessed on an
annual basis to ensure ongoing effectiveness and compliance.  The Corporate
Management Team also have a role to play in terms of identifying any improvement
actions and/or future planned developments in relation to key governance
arrangements and continuous improvement activity and this annual evaluation role was
carried out at their meeting on 16th June 2023. 
1.10 With the annual review process now concluded for 2022/23, the updated Strategic 
Governance Framework is now presented to the Audit and Scrutiny Panel for approval 
in line with the Panel’s role to provide independent assurance to the council and those 
charged with governance on the adequacy of the council’s risk management framework 
and internal control environment. 
Strategic Governance Framework 
2.1 The refreshed Strategic Governance Framework attached at Appendix 1 sets out the
council’s commitment to ensuring that its business is conducted in accordance with the
law and proper standards, and that public money is safeguarded, properly accounted
for, and used economically, efficiently, and effectively. 
2.2 This commitment, allied to the principles of good governance set out in the Delivering
Good Governance in Local Government: Framework, takes into account the
environment within which the council operates and, as such, sets out the council’s local
code of governance within the local context and long-term vision of The Plan for North
Lanarkshire.   
2.3 This commitment also supports the council in meeting its statutory Best Value
obligations as effective governance and accountability arrangements, with openness
and transparency in decision-making, schemes of delegation, and effective reporting
of performance are essential for taking informed decisions and ensuring effective

Page 4

scrutiny of performance and stewardship of resources. 
2.4 The Strategic Governance Framework in Appendix 1 comprises two further
appendices: 
• Appendix A: This lists the 7 principles and 21 sub principles from the national
Delivering Good Governance in Local Government: Framework supported by 91
behaviours and actions that demonstrate good governance in practice.
• Appendix B: Each of the specific elements and mechanisms which form the
council’s local code of governance have been aligned to the 7 principles (and 21
sub principles) within the national Framework.  The list of elements and
mechanisms set out within Appendix B provide a tangible evidence base which
enables the council to demonstrate good governance in practice. 
2.5 These elements and mechanisms span the complete range of council activities and
include arrangements for corporate governance, risk management, and internal
financial controls.  Each has been assigned a timeframe to support the review
programme and ensure they remain timely and effective in supporting delivery of the
Programme of Work and The Plan for North Lanarkshire. 
2.6 The information within Appendix B also contains an assessment of each of the
elements and mechanisms.  Based on this assessment each element and mechanism
has been assigned a RAG status.  This assessment process was first introduced at the
end of 2020/21 as a method by which to identify and prioritise items requiring to be
reviewed and updated further. 
2.7 The use of this assessment process (and corresponding RAG status) aims to ensure
all elements and mechanisms are as up to date as they require to be.  Definitions
supporting the RAG status are noted in the table below: 
RAG status Definition
Red
The element or mechanism was last reviewed / updated prior to January 2020 and
there is a requirement for an annual (or other regular frequency) review and/or
update to be undertaken, or there has been a change in legislation which
necessitates a review and update, but either way no commitment has been
identified from a Chief Officer to do so.
Amber 
Although the element or mechanism has been reviewed and/or updated, this has not
been carried out within the pandemic recovery environment to reflect any changes in
service delivery or impacts on compliance with good governance, or (while there is a
commitment by a Chief Officer to carry out a review and/or update) there has been
slippage in the timescale identified to do so.
Green
The element or mechanism has been reviewed and/or updated since January 2020
and has been subject to an annual (or other regular frequency) review and/or update
since then so there is no requirement for a further update at this time, or a Chief
Officer or the Corporate Management Team has already identified that the item
requires to be reviewed and/or updated during 2023/24. 
Next steps 
2.8 Although the Strategic Governance Framework is subject to an annual review and
refresh process, it is not a static document and as such: 
(a) Chief Officers will be responsible for ensuring that all elements and mechanisms
within their area of responsibility are reviewed and updated, and submitted to the
Corporate Management Team and/or relevant Committee (as appropriate), in line

Page 5

with the review programme.
(b) The Strategy and Performance function within Business and Digital will continue to
keep the list of elements and mechanisms under review to ensure any other policy
developments or legislative changes are considered for inclusion in the council’s
local code of governance, as appropriate. 
2.9 The following list for Chief Officers to use when reviewing and updating each of the
elements and mechanisms contained within the Strategic Governance Framework
review programme was first introduced in June 2021.  This has been implemented
during 2021/22 and 2022/23 with no adverse feedback received.  As such, all reports
to the Business Management Team, Corporate Management Team, or a Committee -
which provide an update on work to review and/or refresh an element or mechanism in
Appendix B - will continue to require to contain the following: 
• An assessment of the effectiveness of the particular element or mechanism.
• A summary outlining the changes / improvements made to the element or
mechanism since the last update.
• The role of the element or mechanism in supporting the successful delivery of The
Plan for North Lanarkshire. 
3. Measures of success 
3.1  Good governance enables the council to effectively pursue the ambition set out in The
Plan for North Lanarkshire within appropriate controls and the management of risk.  It
is also central to ensuring effective scrutiny and delivery of statutory Best Value
obligations.   
A measure of success will be in ensuring the elements and mechanisms on the review
programme remain up to date and are effective in supporting delivery of the Programme
of Work and The Plan for North Lanarkshire.   
4. Supporting documentation 
4.1 Appendix 1  -  Strategic Governance Framework
• Appendix A: 7 principles, 21 sub principles, and 91 behaviours and
actions that demonstrate good governance in practice in line with
the national Delivering Good Governance in Local Government:
Framework
• Appendix B: North Lanarkshire Council local code of governance
review programme 
Katrina Hassell
Chief Officer (Business and Digital) 
5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public

Page 6

Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact?
The Delivering Good Governance in Local Government: Framework (2016)
positions the attainment of sustainable economic, societal, and environmental
outcomes as a key focus of governance processes and structures.  As such this is
reflected in the Strategic Governance Framework.
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Yes ☐ No ☒
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts been discussed and agreed with
Finance?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact?
Development and publication of the Strategic Governance Framework supports the
council’s compliance with the CIPFA Statement on the Role of the Chief Financial
Officer in Local Government 2016 in terms of financial controls.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?

Page 7

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or scheduled) by the Enterprise Architecture
Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact?
The Delivering Good Governance in Local Government: Framework (2016)
positions the attainment of sustainable economic, societal, and environmental
outcomes as a key focus of governance processes and structures.  As such this is
reflected in the Strategic Governance Framework.
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Work to review and refresh the Strategic Governance Framework - and ensure the
council continues to support the Best Value duty and comply with the principles set
out within the Delivering Good Governance in Local Government: Framework
(2016) - contributes towards the mitigation of the risk on the Corporate Risk
Register for Governance, Leadership, and Decision Making.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐

Page 8

Strategic Governance Framework  
Appendix 1

Page 9

2 
Document control
Title Strategic Governance Framework
Owner Katrina Hassell, Chief Officer (Business and Digital) Contact HassellK@northlan.gov.uk 
Governance group Audit and Scrutiny Panel
Author Susan Lawrie, Strategy and Performance Manager Contact LawrieS@northlan.gov.uk 
Revision history
Number Originator Date review commenced Revision description / record of change
1.0 Linda Johnston, Business Strategy Manager 2020 Original framework created
2.0 Linda Johnston, Business Strategy Manager June 2021 Annual review
3.0 Linda Johnston, Business Strategy Manager June 2022 Annual review
4.0 Linda Johnston, Business Strategy Manager April 2023 Annual review 
Document approvals
Number Governance group Date approval granted Date approval to be requested
(if document still draft)
1.0 Audit and Scrutiny Panel 2020 
2.0 Audit and Scrutiny Panel September 2021 
3.0 Audit and Scrutiny Panel September 2022 
4.0 Audit and Scrutiny Panel  June 2023 
Consultation record (for most recent update)
Status of document consulted upon Strategic Governance Framework
Stakeholders consulted / date Corporate Management Team (16/06/23) 
Strategic alignment 
Next review date
Review date June 2024 
The Plan for North Lanarkshire and all 5 priorities and 25 ambition statements therein, the Programme of Work, Strategic Policy Framework, Strategic Performance
Framework, Strategic Self-Evaluation Framework, Project Management Framework, and Framework for Demonstrating Improved Outcomes for Communities.

Page 10

3 
Table of contents 
Page
number
Introduction  ……………………………………………………………………………………….. 4
Good governance in the public sector ………………………………………………………... 5
Good governance in local government  ………………………………………………………. 6
Local code of governance  ……………………………………………………………………….  7 - 12
- Requirements  …………………………………………………………………………………. 7
- Local context  ………………………………………………………………………………….. 7
- Local code of governance  ………………………………………………...…………………. 7-10
- Annual review and assessment  ……………………………………………………………... 10
- Continuous improvement  …………………………………………………………………….. 10
- Roles and responsibilities  ……………………………………………………………………. 10-11
Appendix A: 7 principles and 21 sub principles from the national Framework  …………….. 13 - 17
Appendix B: North Lanarkshire Council local code of governance review programme  …... 18 - 42

Page 11

4 
Introduction 
The Plan for North Lanarkshire sets the long-term strategic direction for
the council, partners, and other stakeholders and, most importantly, for
each unique community and the people who Live, Learn, Work, Invest,
and Visit within North Lanarkshire.  It’s a Plan with a shared ambition of
inclusive growth and prosperity and a fairer distribution of wealth across
all local communities. 
As the delivery vehicle for the shared ambition, the Programme of Work
(now in its fifth iteration) enables a recurring and dynamic approach to
realising the shared ambition.  It enables delivery of the long-term vision
to be informed by a strategic planning process that is framed within the
context of the local demographic, social, and economic profile that
shaped The Plan for North Lanarkshire, as well as the latest national
policy changes and developments.  This process also ensures a more
targeted approach to establishing the programmes, projects, and
activities required to achieve the intended outcomes. 
Key to assessing the success of The Plan for North Lanarkshire are six
inter-related strategic frameworks that focus on ensuring a corporate one
council approach.  They are also key to monitoring delivery towards
achieving the overall vision and ensuring each stage is appropriately
planned, guided, implemented, and governed.   
• Strategic Governance Framework
• Strategic Policy Framework
• Strategic Performance Framework
• Strategic Self-Evaluation Framework 
• Project Management Framework 
• Framework for Demonstrating Improved Outcomes for Communities 
To ensure these frameworks remain aligned to The Plan for North
Lanarkshire and Programme of Work, all are on a regular review and
refresh programme.  This also helps the council to ensure it is proactive
in responding to social, economic, and environmental trends and
changes in legislation and governance, as well as the broad range of
national policy changes and new developments. 
The council’s Strategic Governance Framework is set out within this
document.  
To comply with good governance principles, the council must ensure that
its business is conducted in accordance with the law and proper
standards, and that public money is safeguarded, properly accounted for,
and used economically, efficiently, and effectively. 
Good governance is also central to meeting statutory Best Value
obligations as effective governance and accountability arrangements -
with openness and transparency in decision-making, schemes of
delegation, and effective reporting of performance - are essential for
taking informed decisions and ensuring effective scrutiny of performance
and stewardship of resources. 
To ensure its good governance arrangements are sound and the highest
standards are met, the council is required to set out its commitment to
the national principles of good governance by determining its own
governance structure (local code) underpinned by these principles.   
The council’s local code in this respect is set out on pages 7 to 12.  This
brings the principles of good governance together with legislative
requirements and management processes by which the council is
directed and controlled and through which it is accountable to, engages
with, and leads the local community. 
This aims to ensure the council is able to effectively pursue the long-term
ambition set out in The Plan for North Lanarkshire, while ensuring this is
underpinned with control and the management of risk, and:
• Resources are directed in accordance with agreed policies and
according to priorities, and in line with corporate project
management procedures.
• There is sound and inclusive decision making.
• There is clear accountability for the use of those resources in
achieving defined outcomes for service users and local
communities. 
Chief Officers and Elected Members are responsible for determining and
implementing the council’s governance arrangements and ensuring the
local code is assessed on an annual basis to ensure ongoing
effectiveness and compliance.  In this respect the council’s annual
review process is depicted on page 12 and the review programme is set
out in Appendix B (page 18).

Page 12

5 
Good governance in the public sector 
The principles of good governance in the public sector are defined by the International Framework: Good Governance in the Public Sector which was jointly
developed by the Chartered Institute of Public Finance and Accountancy (CIPFA) and the International Federation of Accountants (IFAC). 
The International Framework offers the definition that:
• “Governance comprises the arrangements put in place to ensure that the intended outcomes for stakeholders are defined and achieved.” 
The fundamental function of good governance is to ensure that governing bodies (and individuals working for public sector entities) achieve their intended
outcomes while acting in the public interest at all times.  Acting in the public interest implies primary consideration of the benefits for society, which should
result in positive outcomes for service users and other stakeholders, and requires: 
A. Behaving with integrity, demonstrating strong commitment to ethical values, and respecting the
rule of law.
B. Ensuring openness and comprehensive stakeholder engagement. 
In addition to the overarching requirements for acting in the public interest (as noted in principles A. and
B. above), achieving good governance also requires effective arrangements for: 
C. Defining outcomes in terms of sustainable economic, social, and environmental benefits.
D. Determining the interventions necessary to optimise the achievement of the intended
outcomes.
E. Developing the entity’s capacity, including the capability of its leadership and the individuals
within it.
F. Managing risks and performance through robust internal control and strong public financial
management.
G. Implementing good principles in transparency, reporting, and audit, to deliver effective
accountability. 
Figure 1 illustrates the 7 principles of good governance (A. to G. listed above) and outlines how they
relate to each other.  Principles A. and B. underpin implementation of principles C. to G.   
Figure 1 also illustrates that good governance is dynamic and that a public body should be committed
to improving governance on a continuing basis through a process of review and evaluation. 
The aim of the International Framework is to encourage better service delivery and improved accountability by
establishing a benchmark for aspects of good governance in the public sector. 
Figure 1

Page 13

6 
Good governance in local government 
The principles in the International Framework have been interpreted for the local government environment.  This is set out in the Delivering Good
Governance in Local Government: Framework (2016) and accompanying Guidance Notes for Scottish Local Authorities (2016) published by CIPFA in
association with the Society of Local Authority Chief Executives (SOLACE).   
The Delivering Good Governance in Local Government: Framework details the 7 principles within the International Framework along with a set of 21
supporting sub-principles.  The 7 principles and 21 supporting sub-principles are specified in Appendix A on page 13. 
In practice, governance comprises the combination of structures, strategies, policies, plans, frameworks, systems, processes, rules, codes, procedures,
cultures, and values that are used to direct, control, and manage a local authority’s operations and activities.  This includes political, economic, social,
environmental, legal, and administrative structures and processes, and other arrangements, as encapsulated in the principles defined in the Framework. 
These define roles and responsibilities and accountabilities and establish mechanisms to enable a local authority to pursue its vision effectively and ensure
that the vision is underpinned with control and the management of risk.  The list of items referred to in this paragraph are hereinafter referred to as elements
and mechanisms.  Through these elements and mechanisms the overall aim is to ensure: 
• Resources are directed in accordance with agreed policy and according to priorities, and in line with corporate project management procedures.
• There is sound and inclusive decision making.
• There is clear accountability for the use of those resources in achieving defined outcomes for service users and local communities. 
The essence underpinning the Delivering Good Governance in Local Government: Framework is that local government develops and shapes its own
approach to governance, taking account of the environment within which it operates.  Within this context, it is therefore up to each local authority to: 
• Set out its commitment to the principles of good governance outlined in the Delivering Good Governance in Local Government: Framework.
• Determine its own governance arrangements, or local code, underpinned by these principles.
• Ensure that the local code operates effectively in practice. 
A crucial aspect in delivering good governance is the way that it is applied.  The ethos of good governance cannot be achieved by structures, rules, and
procedures alone.  Effectively, good governance needs to be embedded within an organisation and its culture and the need for, and value of, good
governance must be explicit. 
Reflecting the principles in the Delivering Good Governance in Local Government: Framework, the local code set out in this Strategic Governance
Framework demonstrates North Lanarkshire Council’s commitment to good governance and outlines the arrangements in place in line with the 7 principles
and 21 supporting sub principles.

Page 14

7 
Local code of governance 
Requirements
By defining the 7 principles and 21 supporting sub principles, the Delivering Good Governance in Local Government: Framework provides a structure to help
the council set out its arrangements in relation to good governance.   
All councils are required to test their governance arrangements against these principles by: 
• Reviewing existing governance arrangements.
• Developing and maintaining an up to date local code of governance that takes into account the environment within which it operates and includes
arrangements for ensuring ongoing effectiveness.
• Reporting publicly on compliance with the local code on an annual basis, including how the governance arrangements have been monitored for
effectiveness in the year and identifying planned changes. 
Local context
The council has a long-term vision for North Lanarkshire to be the place to live, learn, work, invest, and visit.  Set out in The Plan for North Lanarkshire, the
vision was shaped by the area’s demographic, social, and economic profile which at the time showed a positive picture in terms of economic growth, inward
investment, employment, and educational attainment, but still unacceptably high levels of deprivation and child poverty and clear areas of inequity and
inequality remaining.  This meant that not all North Lanarkshire’s people were sharing equally in the improving picture, and there was an element of social
exclusion across some towns and communities. 
Aiming to achieve inclusive growth and prosperity for all, The Plan for North Lanarkshire sets out the ambition to deliver sustainable economic growth.  As
the delivery vehicle for the shared ambition, the Programme of Work provides a clear roadmap for work across council services and with partners in this
respect.  An annual strategic planning process enables a recurring and dynamic approach to realising the shared ambition.  It enables delivery of the long-
term vision to be informed by a strategic planning process that is framed within the context of the local demographic, social, and economic profile that
shaped The Plan for North Lanarkshire, as well as the latest national policy changes and developments.  This process also ensures a more targeted and
cohesive approach to establishing the programmes, projects, and activities required to achieve the intended outcomes. 
Achievements to date highlight developments that are key to creating the economic, social, and community conditions that will enable local people and
communities (and the place that is North Lanarkshire) to thrive.  These focus on the investment made to establish the solid foundations required to support
the place based ambition.  This includes the provision of high quality housing, hubs at the heart of local communities, transformations to town centres, and
enhancements to active green spaces to bring physical and mental benefits.  This is supported by growing transport links, an enhanced digital infrastructure,
and a network of active travel routes, all of which is aimed at boosting the local economy, attracting inward investment, securing improved opportunities and
outcomes for employment, education, housing, and leisure, and creating places where people want to live, learn, work, invest, and visit.   
The fifth iteration of the Programme of Work (to 2028) was approved in March 2023.  This longer-term approach reflected the need to reframe the
Programme of Work in line with the latest North Lanarkshire context presented through the suite of 28 health check indicators.  This evidence base shows
positive trends in a number of key economic indicators (such as gross weekly pay, people claiming employment related benefits, and growth in North
Lanarkshire’s economy), as well as significant improvements in educational attainment for all pupils gaining 5+ awards at level 6 and for pupils living in the
20% most deprived areas, leavers achieving a positive post school destination, and school exclusion rates.  These trends were considered particularly

Page 15

8 
significant given the extent of the impact of the pandemic that is evident in certain indicators, however the trends also show that challenges remain,
reiterating the need for a new approach to the development of the fifth iteration of the Programme of Work to ensure a heightened and more strategic focus
on not only sustaining the economic and community aspects, but also on ensuring a more targeted approach to improving social conditions and outcomes. 
Local code of governance
The council’s local code of governance outlines the elements and mechanisms in place to ensure appropriate oversight and governance of the Programme
of Work and enable the council to monitor the delivery of its ambitions, while ensuring arrangements for corporate governance, risk management, and
internal financial controls are sound.  The specific details on each of the elements and mechanisms in the local code of governance are set out in Appendix
B and based on the following. 
• Identifying and setting out the council’s long-term strategic ambition and priorities in The Plan for North Lanarkshire and ensuring the vision for inclusive growth and
prosperity for all is embedded throughout all other policy statements agreed by the council, as well as all strategic management, service delivery, and corporate
governance approaches.
• Establishing the six inter-related strategic frameworks (Policy, Governance, Performance, Self-Evaluation, Project Management, and Demonstrating Improved
Outcomes for Communities) that aim to maintain a corporate one council approach across the organisation, and ensuring these frameworks remain aligned to The
Plan for North Lanarkshire and Programme of Work through a regular review and refresh programme.
• Establishing a strategic planning process through the Programme of Work which is framed within the context of the local demographic, social, and economic profile
that shaped The Plan for North Lanarkshire.  This approach enables a recurring, dynamic, and cohesive approach to developing the programmes, projects, and
activities required to realise the vision for inclusive growth and prosperity for all, with corresponding arrangements in place (through the Strategic Policy Framework)
to ensure a consistent approach to establishing the strategies, policies, and plans required to achieve the intended outcomes.
• Standing Orders that allow the council to delegate decision making to committees, sub-committees, or officers and sets out the rules which apply to the running and
operation of council and committee meetings.
• A Scheme of Administration which clearly sets out functions, terms of reference, and powers of the council and its committees and sub-committees and which is
aligned to the organisational structure to facilitate decision making in line with the council’s strategy.
• A Scheme of Delegation to Officers which sets out the functions delegated to the Chief Officers of the council.
• Financial Regulations and a Scheme of Financial Delegation which, as an integral part of the council’s framework of internal financial controls, are designed to
ensure effective stewardship of council funds. Compliance with these regulations ensures that public money is safeguarded and properly accounted for, and all
financial transactions are undertaken in a manner which demonstrates openness, transparency, and integrity.  The Financial Regulations form a key part of the
overarching Financial Strategy and the corporate governance arrangements of the council.
• The Financial Strategy which is the overarching framework that establishes the financial strategies and policies to ensure effective financial governance, planning,
and management and, as such, sets out the responsibility for safeguarding public funds within the council.  It also sets out the role and responsibilities of the Chief
Financial Officer, in line with the corresponding CIPFA Statement (2016).  The strategies and policies covered by the Financial Strategy include the Capital Strategy,
Treasury Management Strategy, Revenue Budget Strategy, the Medium-Term Financial Plan, and the Financial Regulations and Scheme of Financial Delegation.
• A Risk Management Strategy which sets out a clear direction for how the council will identify, assess, and manage the risks faced in providing high quality public
services and delivering The Plan for North Lanarkshire.  The strategy is intended to ensure that the council is risk aware rather than risk averse and that the
management of risk is embedded in the council’s policies, procedures, culture, and practices. It is designed to ensure that key decisions are taken with an
understanding of risks and their effective control.
• Risk management arrangements which form an important element of good corporate governance and are designed to ensure that the council operates systematic
and logical processes for managing risks within a comprehensive framework, ensuring that identified risks are managed consistently, effectively, efficiently, and
coherently across the organisation. These arrangements include regular oversight of the council’s risk management arrangements and management of key
corporate risks by the Audit and Scrutiny Panel.
• Codes of Conduct for Elected Members, Chief Officers, and Employees which provide frameworks within which individuals are expected to undertake their duties in
a manner which meets the required standards for good governance.  This includes ensuring declarations of interests, and declarations for conflicts of interest and

Page 16

9 
gifts and hospitality, are appropriately (and regularly) made and published.
• Ensuring legislative obligations are fulfilled through the statutory officer roles, i.e. the posts of head of paid service, monitoring officer, chief financial officer (section
95 officer), and the chief social work officer.
• An Anti-Fraud Policy and Fraud Response Plan which sets out the council’s expectations (that extends to all individuals and organisations with whom it deals) in
terms of acting honestly and with integrity and in safeguarding public resources. 
• A Whistleblowing Procedure which provides a mechanism for employees of the council, and other workers within the council, to report a concern about serious
wrongdoing within the council and to do so with security and in confidence.
• A senior management team structure which comprises a Business Management Team (to monitor the efficient and effective operation of the council and ensure
pursuit of the long-term vision set out in The Plan for North Lanarkshire is underpinned with the relevant assurances and controls in terms of corporate governance,
risk management, and financial management), and a Corporate Management Team (to ensure strategic oversight, direction, and a one council approach in terms of
delivery of the vision through the Programme of Work.  This is supported by a meetings structure comprising service Senior Management Teams focussing on the
operational delivery of service remits, and an Operational Management Team to cascade the context, deliverables, and accountabilities and ensure consistency of
message in terms of the long-term vision and day to day delivery through the Programme of Work.  All Chief Officers are members of the Corporate Management
Team; this includes those Chief Officers who hold a statutory officer role.
• An Audit and Scrutiny Panel whose activities and functions comply with the standards set out in CIPFA’s Position Statement: Audit Committees in Local Authorities
(2018), and whose purpose is to provide independent assurance to the council and those charged with governance on the adequacy of the council's risk
management framework and internal control environment.  
• A Strategic Performance Framework which sets out performance measurement at three levels in order to collectively provide an overview of performance (over time
and compared to targets) to help understand the impact of council activities on improving services and outcomes for the people and communities of North
Lanarkshire.  These measures also allow for day to day activities, and progress towards achieving the long-term vision set out in The Plan for North Lanarkshire, to
be regularly monitored, reported, assessed, and scrutinised.  
• Formal reporting arrangements through an annual Performance Reporting Schedule that comprises Chief Officer reviews at service committees, corporate
reporting, and service specific reporting to meet both business and statutory obligations and which is underpinned by five non-negotiable standards that support
regular performance assurance reviews.
• Comprehensive revenue budget and capital expenditure guidelines, with well-established processes and systems to ensure regular monitoring and reporting, as well
as oversight and scrutiny through the senior management team structure of meetings and Elected Members.
• A range of programme and project Boards and working groups aligned to the delivery and governance requirements for specific Programme of Work items, e.g.
Strategic Capital Delivery Group, DigitalNL, Hub Delivery Programme Board, and Data Governance Board.
• An Information Governance Policy Framework, comprising policies in terms of records and information management, data protection, information handling and
classification, information risk, information security, and payment card industry data security to ensure proper recording of information, appropriate access to that
information including by the public, and compliance with legislation.
• An Information Security Policy which includes cyber security and aims to protect the council’s information systems and physical assets including supporting
processes, networks, and equipment.  This is essential to ensure the council can continue to operate and successfully deliver its functions, while finding the right
balance between the benefits and risks to the processing of information. 
• Publicly available complaints and freedom of information procedures with management, monitoring, and performance reporting arrangements.
• A range of employment and other policies, and associated guidance documents and forms, which promote and support ethical behaviour and standards of conduct
by employees.  An employee Performance Review and Development (PRD) process and access to a range of training and development programmes and
opportunities through LearnNL for both employees and Elected Members.
• Workforce plans that include an analysis of the risks and issues facing the current workforce and identify the gaps in terms of fulfilling service provision and
delivering on priorities and the long-term vision in the future.
• Independent and objective assurances provided by Internal Audit whose function is designed to add value and improve the council’s operations.  The Internal Audit
function operates within the Public Sector Internal Audit Standards (PSIAS) and the council’s Internal Audit Charter. The service undertakes an annual programme
of work approved by the Audit and Scrutiny Panel which is based on the Internal Audit Annual Plan. This plan is risk based and is periodically updated to reflect
evolving issues and changes.

Page 17

10 
• Independent and objective assurances provided by the external auditors through the Annual Audit Report (AAR) process and other audit, inspection, and regulatory
bodies. 
Annual review and assessment
The council’s local code of governance requires to be reviewed to ensure it operates effectively in practice and an annual assessment of compliance with the
principles requires to be undertaken and reported in public.  The annual review process is outlined in Figure 2 on page 12.   
Chief Officers and Elected Members are responsible for determining and implementing the council’s governance arrangements and ensuring the local code
is assessed on an annual basis to ensure ongoing effectiveness and compliance. 
Continuous improvement
Introduced under the Local Government in Scotland Act 2003, the council has a duty to ensure Best Value.  This requires the council to “make arrangements
to secure continuous improvement in performance” in the way in which its functions are exercised, having regard to a combination of economy, efficiency,
and effectiveness.   
Good governance is central to meeting statutory Best Value obligations as effective governance and accountability arrangements - with openness and
transparency in decision-making, schemes of delegation, and effective reporting of performance - are essential for taking informed decisions and ensuring
effective scrutiny of performance and stewardship of resources. 
Areas requiring improvement are also identified through the work of the Internal Audit function, the external auditors Annual Audit Report (AAR), the various
external bodies’ audit / inspection / regulation reports, and the council’s Strategic Self-Evaluation Framework and rolling review programme.  Outputs from
these processes are a key piece of evidence required to inform the development of the Annual Governance Statement. 
The council’s Strategic Self-Evaluation Framework is aligned to the seven Best Value themes: 
• Vision and leadership
• Governance and accountability
• Use of resources
• Partnerships and collaborative working
• Working with communities
• Sustainable development
• Fairness and equality 
These themes are outlined within the national guidance (updated in 2020 and available at: https://www.gov.scot/publications/best-value-revised-statutory-
guidance-2020/) which is designed to help local authorities and other public bodies to demonstrate continuous improvement in their performance. 
Roles and responsibilities  
Chief Officers and Elected Members are responsible for determining and implementing the council’s governance arrangements and ensuring the Strategic
Governance Framework is assessed on an annual basis to ensure ongoing effectiveness and compliance.

Page 18

11 
In identifying how the effectiveness of the council’s governance arrangements have been monitored and evaluated in the year, the Corporate Management
Team has a role to play in terms of identifying any improvement actions and/or future planned developments in relation to key governance arrangements and
continuous improvement activity. 
Improvements to the process to review effectiveness were first introduced in 2021 through the establishment of the following list for Chief Officers to use when
reviewing and updating each of the elements and mechanisms on the Strategic Governance Framework review programme.  As such, all reports to the
Business Management Team, Corporate Management Team, and/or a Committee - which provide an update on work to review and refresh an element or
mechanism in Appendix B - require to contain the following: 
• An assessment of the effectiveness of the particular element or mechanism.
• A summary outlining the changes / improvements made to the element or mechanism since the last update.
• The role of the element or mechanism in supporting the successful delivery of The Plan for North Lanarkshire. 
As set out in the Scheme of Administration (October 2022), the Audit and Scrutiny Panel is a key component of the council’s corporate governance
arrangements. The purpose of the Audit and Scrutiny Panel is to “provide independent assurance to the council and those charged with governance on the
adequacy of the council’s risk management framework and internal control environment. It provides independent review of the council’s governance, risk
management, performance and control frameworks and oversees the financial reporting and annual governance processes. It oversees the council’s internal
and external audit arrangements, helping to ensure efficient and effective assurance arrangements are in place. It also undertakes the scrutiny function within
the council’s governance framework and will establish short life task group reviews, as required, to undertake in-depth examination of particular areas of
policy and/or service delivery with a view to making recommendations for improvement.”

Page 19

12 
Figure 2
Annual review process

Page 20

13 
Appendix A: 7 principles and 21 sub principles 
The 7 principles (A. to G.) within the International Framework: Good Governance in the Public Sector together with the 21 supporting sub-principles set out in
the Delivering Good Governance in Local Government: Framework are listed in the table below (pages 13 to 17) along with 91
examples of behaviours and actions that according to CIPFA demonstrate good governance in practice. 
A. Behaving with integrity, demonstrating strong commitment to ethical values, and respecting the rule of law.
B. Ensuring openness and comprehensive stakeholder engagement.
C. Defining outcomes in terms of sustainable economic, social, and environmental benefits.
D. Determining the interventions necessary to optimise the achievement of the intended outcomes.
E. Developing the entity’s capacity, including the capability of its leadership and the individuals within it.
F. Managing risks and performance through robust internal control and strong public financial management.
G. Implementing good principles in transparency, reporting, and audit, to deliver effective accountability. 
e.g. 
• Principle A = Behaving with integrity, demonstrating strong commitment to ethical values, and respecting the rule of law.
• Sub-principles = A1. BEHAVING WITH INTEGRITY, A2. DEMONSTRATING STRONG COMMITMENT TO ETHICAL VALUES, A3. RESPECTING THE RULE OF LAW.
• Listed below that are the behaviours and actions that demonstrate good governance in practice (e.g. 1.1 to 1.4; 2.1 to 2.4; and 3.1 to 3.5). 
A. Behaving with integrity, demonstrating strong commitment to ethical values, and respecting the rule of law
A1. BEHAVING WITH INTEGRITY A2. DEMONSTRATING STRONG COMMITMENT TO
ETHICAL VALUES A3. RESPECTING THE RULE OF LAW
1.1  Ensuring members and officers behave with integrity
and lead a culture where acting in the public interest
is visibly and consistently demonstrated thereby
protecting the reputation of the organisation.
1.2  Ensuring members take the lead in establishing
specific standard operating principles or values for
the organisation and its staff and that they are
communicated and understood. These should build
on the seven Principles of Public Life (also known as
the Nolan principles), i.e. selflessness, integrity,
objectivity, accountability, openness, honesty, and
leadership. 
1.3  Leading by example and using these standard
operating principles or values as a framework for
decision making and other actions.
1.4  Demonstrating, communicating, and embedding the
standard operating principles or values through
appropriate policies and processes which are
reviewed on a regular basis to ensure that they are
operating effectively. 
2.1  Seeking to establish, monitor and maintain the
organisation’s ethical standards and performance.
2.2  Underpinning personal behaviour with ethical values
and ensuring they permeate all aspects of the
organisation’s culture and operation.
2.3  Developing and maintaining robust policies and
procedures which place emphasis on agreed ethical
values.
2.4  Ensuring that external providers of services on behalf
of the organisation are required to act with integrity
and in compliance with high ethical standards
expected by the organisation.
3.1  Ensuring members and staff demonstrate a strong
commitment to the rule of the law as well as adhering
to relevant laws and regulations.
3.2  Creating the conditions to ensure that the statutory
officers, other key post holders and members are
able to fulfil their responsibilities in accordance with
legislative and regulatory requirements.
3.3  Striving to optimise the use of the full powers
available for the benefit of citizens, communities, and
other stakeholders.
3.4  Dealing with breaches of legal and regulatory
provisions effectively.
3.5  Ensuring corruption and misuse of power are dealt
with effectively.

Page 21

14 
B. Ensuring openness and comprehensive stakeholder engagement
B1. OPENNESS B2. ENGAGING COMPREHENSIVELY WITH
INSTITUTIONAL STAKEHOLDERS
B3. ENGAGING STAKEHOLDERS EFFECTIVELY,
INCLUDING INDIVIDUAL CITIZENS AND SERVICE
USERS
1.1  Ensuring an open culture through demonstrating,
documenting, and communicating the organisation’s
commitment to openness.
1.2  Making decisions that are open about actions, plans,
resource use, forecasts, outputs, and outcomes. The
presumption is for openness. If that is not the case, a
justification for the reasoning for keeping a decision
confidential should be provided.
1.3  Providing clear reasoning and evidence for decisions
in both public records and explanations to
stakeholders and being explicit about the criteria,
rationale and considerations used. In due course,
ensuring that the impact and consequences of those
decisions are clear.
1.4  Using formal and informal consultation and
engagement to determine the most appropriate and
effective interventions/ courses of action.
2.1  Effectively engaging with institutional stakeholders to
ensure that the purpose, objectives and intended
outcomes for each stakeholder relationship are clear
so that outcomes are achieved successfully and
sustainably.
2.2  Developing formal and informal partnerships to allow
for resources to be used more efficiently and
outcomes achieved more effectively.
2.3  Ensuring that partnerships are based on - trust, a
shared commitment to change, a culture that
promotes and accepts challenge among partners -
and that the added value of partnership working is
explicit.
3.1  Establishing a clear policy on the type of issues that
the organisation will meaningfully consult with or
involve individual citizens, service users and other
stakeholders to ensure that service (or other)
provision is contributing towards the achievement of
intended outcomes.
3.2  Ensuring that communication methods are effective,
and that members and officers are clear about their
roles with regard to community engagement.
3.3  Encouraging, collecting, and evaluating the views and
experiences of communities, citizens, service users
and organisations of different backgrounds including
reference to future needs.
3.4  Implementing effective feedback mechanisms in
order to demonstrate how their views have been
taken into account.
3.5  Balancing feedback from more active stakeholder
groups with other stakeholder groups to ensure
inclusivity.
3.6  Taking account of the interests of future generations
of taxpayers and service users.
C. Defining outcomes in terms of sustainable economic, social, and environmental benefits
C1. DEFINING OUTCOMES C2. SUSTAINABLE ECONOMIC, SOCIAL, AND ENVIRONMENTAL BENEFITS
1.1  Having a clear vision which is an agreed formal statement of the organisation’s
purpose and intended outcomes containing appropriate performance indicators,
which provides the basis for the organisation’s overall strategy, planning and other
decisions.
1.2  Specifying the intended impact on, or changes for, stakeholders including citizens
and service users. It could be immediately or over the course of a year or longer.
1.3  Delivering defined outcomes on a sustainable basis within the resources that will be
available.
1.4  Identifying and managing risks to the achievement of outcomes.
1.5  Managing service users’ expectations effectively with regard to determining
priorities and making the best use of the resources available.
2.1  Considering and balancing the combined economic, social, and environmental
impact of policies, plans and decisions when taking decisions about service
provision.
2.2  Taking a longer-term view with regard to decision making, taking account of risk
and acting transparently where there are potential conflicts between the
organisation’s intended outcomes and short-term factors such as the political cycle
or financial constraints.
2.3  Determining the wider public interest associated with balancing conflicting interests
between achieving the various economic, social, and environmental benefits,
through consultation where possible, in order to ensure appropriate trade-offs.
2.4  Ensuring fair access to services.
D. Determining the interventions necessary to optimise the achievement of the intended outcomes

Page 22

15 
D1. DETERMINING INTERVENTIONS D2. PLANNING INTERVENTIONS D3. OPTIMISING ACHIEVEMENT OF INTENDED
OUTCOMES
1.1  Ensuring decision makers receive objective and
rigorous analysis of a variety of options indicating
how intended outcomes would be achieved and
including the risks associated with those options.
Therefore ensuring best value is achieved however
services are provided.
1.2  Considering feedback from citizens and service users
when making decisions about service improvements
or where services are no longer required in order to
prioritise competing demands within limited resource
available including people, skills, land, and assets
and bearing in mind future impacts.
2.1  Establishing and implementing robust planning and
control cycles that cover strategic and operational
plans, priorities, and targets.
2.2  Engaging with internal and external stakeholders in
determining how services and other courses of action
should be planned and delivered.
2.3  Considering and monitoring risks facing each partner
when working collaboratively including shared risks.
2.4  Ensuring arrangements are flexible and agile so that
the mechanisms for delivering outputs can be
adapted to changing circumstances.
2.5  Establishing appropriate key performance indicators
(KPIs) as part of the planning process in order to
identify how the performance of services and projects
is to be measured.
2.6  Ensuring capacity exists to generate the information
required to review service quality regularly.
2.7  Preparing budgets in accordance with organisational
objectives, strategies, and the medium-term financial
plan.
2.8  Informing medium and long-term resource planning
by drawing up realistic estimates of revenue and
capital expenditure aimed at developing a sustainable
funding strategy.
3.1  Ensuring the medium term financial strategy
integrates and balances service priorities,
affordability, and other resource constraints.
3.2  Ensuring the budgeting process is all-inclusive, taking
into account the full cost of operations over the
medium and longer term.
3.3  Ensuring the medium-term financial strategy sets the
context for ongoing decisions on significant delivery
issues or responses to changes in the external
environment that may arise during the budgetary
period in order for outcomes to be achieved while
optimising resource usage.
3.4  Ensuring the achievement of ‘social value’ through
service planning and commissioning.
E. Developing the entity’s capacity, including the capability of its leadership and the individuals within it
E1. DEVELOPING THE ENTITY’S CAPACITY E2. DEVELOPING THE CAPABILITY OF THE ENTITY’S LEADERSHIP AND OTHER
INDIVIDUALS
1.1  Reviewing operations, performance and use of assets on a regular basis to ensure
their continuing effectiveness.
1.2  Improving resource use through appropriate application of techniques such as
benchmarking and other options in order to determine how the authority’s resources
are allocated so that outcomes are achieved effectively and efficiently.
1.3  Recognising the benefits of partnerships and collaborative working where added
value can be achieved.
1.4  Developing and maintaining an effective workforce plan to enhance the strategic
allocation of resources.
2.1  Developing protocols to ensure that elected and appointed leaders negotiate with
each other regarding their respective roles early on in the relationship and that a
shared understanding of roles and objectives is maintained.
2.2  Publishing a statement that specifies the types of decisions that are delegated and
those reserved for the collective decision making of the governing body.
2.3  Ensuring the leader and the chief executive have clearly defined and distinctive
leadership roles within a structure, whereby the chief executive leads the authority
in implementing strategy and managing the delivery of services and other outputs
set by members and each provides a check and a balance for each other’s
authority.
2.4 Developing the capabilities of members and senior management to achieve
effective shared leadership and to enable the organisation to respond successfully
to changing legal and policy demands as well as economic, political, and

Page 23

16 
environmental changes and risks by - ensuring members and staff have access to
appropriate induction tailored to their role and that ongoing training and
development matching individual and organisational requirements is available and
encouraged, ensuring members and officers have the appropriate skills, knowledge,
resources, and support to fulfil their roles and responsibilities and ensuring that they
are able to update their knowledge on a continuing basis, and ensuring personal,
organisational and system-wide development through shared learning, including
lessons learnt from both internal and external governance weaknesses.
2.5  Ensuring that there are structures in place to encourage public participation.
2.6  Taking steps to consider the leadership’s own effectiveness and ensuring leaders
are open to constructive feedback from peer review and inspections.
2.7  Holding staff to account through regular performance reviews which take account of
training or development needs.
2.8  Ensuring arrangements are in place to maintain the health and wellbeing of the
workforce and support individuals in maintaining their own physical and mental
wellbeing
F. Managing risks and performance through robust internal control and strong public financial management
F1. MANAGING RISK F2. MANAGING
PERFORMANCE
F3. ROBUST INTERNAL
CONTROL F4. MANAGING DATA F5. STRONG PUBLIC
FINANCIAL MANAGEMENT
1.1  Recognising that risk
management is an integral
part of all activities and must
be considered in all aspects
of decision making.
1.2  Implementing robust and
integrated risk management
arrangements and ensuring
that they are working
effectively.
1.3  Ensuring that responsibilities
for managing individual risks
are clearly allocated.
2.1  Monitoring service delivery
effectively including planning,
specification, execution, and
independent post-
implementation review. 
2.2  Making decisions based on
relevant, clear objective
analysis and advice pointing
out the implications and risks
inherent in the organisation’s
financial, social, and
environmental position and
outlook.
2.3  Ensuring an effective scrutiny
or oversight function is in
place which encourages
constructive challenge and
debate on policies and
objectives before, during and
after decisions are made
thereby enhancing the
organisation’s performance
and that of any organisation
3.1  Aligning the risk
management strategy and
policies on internal control
with achieving objectives.
3.2  Evaluating and monitoring
risk management and
internal control on a regular
basis.
3.3  Ensuring effective counter
fraud and anti-corruption
arrangements are in place.
3.4  Ensuring additional
assurance on the overall
adequacy and effectiveness
of the framework of
governance, risk
management, and control is
provided by the internal
auditor.
3.5  Ensuring an audit committee
or equivalent group or
function which is independent
of the executive and
4.1  Ensuring effective
arrangements are in place for
the safe collection, storage,
use and sharing of data,
including processes to
safeguard personal data.
4.2  Ensuring effective
arrangements are in place
and operating effectively
when sharing data with other
bodies. 
4.3  Reviewing and auditing
regularly the quality and
accuracy of data used in
decision making and
performance monitoring.
5.1  Ensuring financial
management supports both
long-term achievement of
outcomes and short-term
financial and operational
performance.
5.2  Ensuring well-developed
financial management is
integrated at all levels of
planning and control,
including management of
financial risks and controls.

Page 24

17 
for which it is responsible.
OR (for a committee system)
Encouraging effective and
constructive challenge and
debate on policies and
objectives to support
balanced and effective
decision making.
2.4  Providing members and
senior management with
regular reports on service
delivery plans and on
progress towards outcome
achievement.
2.5  Ensuring there is consistency
between specification stages
(such as budgets) and post-
implementation reporting
(e.g. financial statements).
accountable to the governing
body: provides a further
source of effective assurance
regarding arrangements for
managing risk and
maintaining an effective
control environment, and that
its recommendations are
listened to and acted upon.
G. Implementing good practices in transparency, reporting, and audit to deliver effective accountability
G1. IMPLEMENTING GOOD PRACTICE IN
TRANSPARENCY G2. IMPLEMENTING GOOD PRACTICE IN REPORTING G3. ASSURANCE AND EFFECTIVE ACCOUNTABILITY
1.1  Writing and communicating reports for the public and
other stakeholders in an understandable style
appropriate to the intended audience and ensuring
that they are easy to access and interrogate.
1.2  Striking a balance between providing the right
amount of information to satisfy transparency
demands and enhance public scrutiny while not being
too onerous to provide and for users to understand.
2.1  Reporting at least annually on  performance, value for
money,  and the stewardship of its resources.
2.2 Ensuring members and senior management own the
results.
2.3  Ensuring robust arrangements for assessing the
extent to which the principles contained in the
Framework have been applied and publishing the
results on this assessment including an action plan
for improvement and evidence to demonstrate good
governance (annual governance statement). 
2.4  Ensuring that the Framework is applied to jointly
managed or shared service organisations as
appropriate.
2.5  Ensuring the performance information that
accompanies the financial statements is prepared on
a consistent and timely basis and the statements
allow for comparison with other similar organisations.
3.1  Ensuring that recommendations for corrective action
made by external audit are acted upon.
3.2  Ensuring an effective internal audit service with direct
access to members is in place which provides
assurance with regard to governance arrangements
and recommendations are acted upon.
3.3  Welcoming peer challenge, reviews and inspections
from regulatory bodies and implementing
recommendations.
3.4  Gaining assurance on risks associated with delivering
services through third parties and that this is
evidenced in the annual governance statement.
3.5  Ensuring that when working in partnership,
arrangements for accountability are clear and that the
need for wider public accountability has been
recognised and met.

Page 25

18 
Appendix B: North Lanarkshire Council local code of governance review programme 
Each of the specific elements and mechanisms which form the council’s local code of governance (as outlined on pages 7 to 12) have been aligned to the 7 principles (and 21 sub principles) within the international and local government
Frameworks.  These are detailed below along with hyperlinks to the relevant documentation, an update on the review timeframe and date of next update (where appropriate), and an assessment of the current position.   
Based on this assessment each element and mechanism has been assigned a RAG status.  The use of this assessment process (and corresponding RAG status) aims to ensure all elements and mechanisms are as up to date as they
require to be, while providing a method by which to identify and prioritise items requiring to be reviewed and/or updated further.  Definitions supporting the RAG status are noted in the table below: 
RAG status Definition
Red The element or mechanism was last reviewed / updated prior to January 2020 and there is a requirement for an annual (or other regular frequency) review and/or update to be undertaken, or there has been a change in
legislation which necessitates a review and update, but either way no commitment has been identified from a Chief Officer to do so.
Amber  Although the element or mechanism has been reviewed and/or updated, this has not been carried out within the pandemic recovery environment to reflect any changes in service delivery or impacts on compliance with
good governance, or (while there is a commitment by a Chief Officer to carry out a review and/or update) there has been slippage in the timescale identified to do so.
Green The element or mechanism has been reviewed and/or updated since January 2020 and has been subject to an annual (or other regular frequency) review and/or update since then so there is no requirement for a further
update at this time, or a Chief Officer or the Corporate Management Team has already identified that the item requires to be reviewed and/or updated during 2023/24. 
Elements and mechanisms in the North Lanarkshire Council local code of governance 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
Standing Orders
Local authorities are corporate bodies created by statute and must make corporate
decisions. Legislation allows local authorities to delegate most decision making to
committees, sub-committees, or officers. This means that committees only operate
within the remits given to them by their council. The council has delegated certain
matters to committees, sub-committees and officers, and the Standing Orders set out
the rules which apply to the running and operation of council and its committee
meetings.
October 2018: https://mars.northlanarkshire.gov.uk/egenda/images/att88879.pdf 
A review of the Standing Orders was carried out in October 2019:
https://mars.northlanarkshire.gov.uk/egenda/images/att92238.pdf.   
This was followed in August 2020 by an amendment approved to the Standing Orders
to permit the council and its committees to meet by remote access.  At this time the
Standing Orders were changed and an annex was incorporated: 
https://mars.northlanarkshire.gov.uk/egenda/images/att94286.pdf. 
An update in December 2022 reflected a change to Standing Order 31.  A copy is
available on InsideNL: Corporate Governance. 
Standing Orders are published on the council’s website:
https://www.northlanarkshire.gov.uk/your-council/how-the-council-works/standing-
orders-and-scheme-of-administration
Latest version: December 2022
Review timeframe: Changes to Standing Orders
are led by Elected Members who can propose
amendments as they wish; these require approval at
a meeting of the Council prior to adoption.
Assessment: Standing Orders are subject to
regular review to determine if they remain fit for
purpose and to identify any revisions required to
further improve the efficient operation of the
council’s decision making process.  
RAG:
Chief Officer (Legal
and Democratic) ✓ ✓ ✓ ✓         ✓        
Financial Regulations and Scheme of Financial Delegation
Financial Regulations are an integral part of the council’s framework of internal
financial controls; these are designed to ensure the effective stewardship of the
council’s  funds. Compliance with these regulations will ensure that public money is
safeguarded and properly accounted for, and all council financial transactions are
undertaken in a manner which demonstrates openness, transparency, and integrity. 
The Financial Regulations form a key part of the overarching Financial Strategy and
the corporate governance arrangements of the council. 
• November 2022:
https://mars.northlanarkshire.gov.uk/egenda/images/att99377.pdf 
• November 2021:
https://mars.northlanarkshire.gov.uk/egenda/images/att97301.pdf 
Latest version: November 2022
Review timeframe: An annual review process is in
place to ensure that both the Financial Regulations
and Scheme of Financial Delegation remain
appropriate for the effective stewardship of the
council’s financial resources.
Assessment: Financial regulations are subject to
regular review.  Key changes made to the Financial
Regulations following the most recent review in
November 2022, and the rationale for each change,
are listed in the accompanying committee report. 
RAG: 
Chief Officer
(Finance)   ✓     ✓  ✓ ✓  ✓  ✓ ✓  ✓   
Scheme of Administration 
The Scheme of Administration provides the details and different functions of
committees and other groups of each council and the delegation of authority to carry
out the functions of the council.  It sets out the terms of reference for committees, sub-
committees, and panels of the council. 
At its meeting on 6th October 2022, the Council approved new governance
arrangements and the Scheme of Administration:
Latest version: October 2022
Review timeframe: The Scheme of Administration
is reviewed following every local government
election.  Officers and Elected Members can
propose amendments as they wish throughout each
term; these require approval at a meeting of the
Council prior to adoption.
Chief Officer (Legal
and Democratic) ✓ ✓ ✓ ✓            ✓

Page 26

19 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
https://mars.northlanarkshire.gov.uk/egenda/images/att98939.pdf 
A copy is available on InsideNL: Corporate Governance. 
The Scheme of Administration is published on the council’s website:
https://www.northlanarkshire.gov.uk/your-council/how-the-council-works/standing-
orders-and-scheme-of-administration
Assessment: 
An updated Scheme of Administration was
approved in October 2022.
RAG: 
Committee arrangements
Committee arrangements support the implementation of the Scheme of
Administration, for example through a timetable of meetings. 
At its meeting on 6th October 2022, the Council approved new governance
arrangements - including the membership of committees, sub-committees, panels,
and outside bodies and the timetable of meetings for 2022-27:
https://mars.northlanarkshire.gov.uk/egenda/public/kab190.pl?cmte=COU&meet=227 
Latest version: October 2022
Review timeframe: The Scheme of Administration
is reviewed following every local government
election.  Officers and Elected Members can
propose amendments as they wish throughout each
term; these require approval at a meeting of the
Council prior to adoption.
Assessment: 
An updated Scheme of Administration was
approved in October 2022.  This included a
timetable of meetings up to 2027.
RAG: 
Chief Officer (Legal
and Democratic) ✓ ✓ ✓ ✓            ✓     
Scheme of Delegation to Officers
The Scheme of Delegation sets out the powers delegated by the Council to officers,
pursuant to the Local Government (Scotland) Act 1973.  The Scheme is intended to
facilitate the efficient conduct of council business by clearly setting out the nature and
extent of the powers delegated to officers by the Council.   
In exercising any delegated function, the nominated officer will take account of any
appropriate council practice or procedure, any managerial instruction given, and any
other similar consideration.   
The Scheme of Delegation to Officers is subject to:
1. The policies adopted by the council.
2. Appropriate provision for financial outlays having been made in the estimates for the
current year.
3. The right of an officer to consult with the Chief Executive on any matter or to refer
any matter to the appropriate committee or sub-committee of the council.
4. The obligation on the Chief Executive and on each Chief Officer to arrange
consultations with individual local Members on matters which affect their areas in all
cases in which the council practice or procedures so require.
5. The requirement that the Chief Executive and all Chief Officers observe the
principles of corporate management.
6. Statutory authority granted only to certain officers. 
April 2019: https://mars.northlanarkshire.gov.uk/egenda/images/att90599.pdf   
A copy is available on InsideNL: Corporate Governance.
Latest version: April 2019
Review timeframe: As a matter of practice, the
Scheme of Delegations to Officers is reviewed
following any organisational change or restructure.
Assessment: Changes approved in April 2019,
reflect realignments in the organisational structure
implemented in September 2018.  
As the council’s Monitoring Officer, the Chief Officer
(Legal and Democratic), has delegated authority to
update the Scheme of Delegation to Officers as
necessary in line with statutory changes and
organisational requirements.
As per an Internal Audit Corporate Governance
report to the Audit and Scrutiny Panel in May 2023 [
https://mars.northlanarkshire.gov.uk/egenda/images
/att100378.pdf  ], there is a management
commitment to review/refresh this document.  This
is scheduled to be submitted to the Council meeting
in October 2023.
RAG: 
Chief Officer (Legal
and Democratic) ✓ ✓ ✓ ✓         ✓   ✓     
Code of Conduct for Chief Officers
This provides a framework within which Chief Officers of the council are expected to
undertake their duties in a manner which meets the required standards for good
governance. 
• June 2023: https://mars.northlanarkshire.gov.uk/egenda/images/att100791.pdf 
• November 2017:
https://mars.northlanarkshire.gov.uk/egenda/images/att87046.pdf
Latest version: June 2023
Review timeframe: As required based on
organisational changes and to reflect updates in
respect of legislation, best practice, and government
guidance.
Assessment: Amendments in 2023 were made to
reflect  the current organisational arrangements.  In
addition, sections 13 (police enquiries) and 17
(potential conflicts of interest) were expanded to
include more explicit wording in respect of the
particular requirements in these areas.
RAG:  
Chief Officer (Legal
and Democratic) ✓ ✓ ✓              ✓    
Chief Officers Register of Interests 
A process to register the interests of Chief Officers was implemented in November
2017: https://mars.northlanarkshire.gov.uk/egenda/images/att87047.pdf 
To comply with this, Chief Officers are required to detail any other renumeration they
receive, property they may own, memberships of clubs and associations or any other
financial interests (for example directorships or shareholdings), they may have.   
Registers are published on the council’s website:
https://www.northlanarkshire.gov.uk/your-council/how-council-works/chief-officers-
register-interests 
Latest version: Registers and council website last
updated in May 2023.
Review timeframe: Annual.
Assessment: Annual process in place which is co-
ordinated by the Depute Monitoring Officer in Legal
and Democratic (as that postholder does not require
to register their interests within the Chief Officers
Register of Interests).
RAG: 
Chief Officer (Legal
and Democratic) ✓ ✓ ✓              ✓    
Statutory officer posts
• The post of head of paid service (the chief executive) was established under the
Local Government and Housing Act 1989 and is responsible to councillors for the
Latest version: Ongoing statutory obligation
Review timeframe: N/A
Assessment: All statutory posts are currently filled.
Chief Executive /
Chief Officer (Legal
and Democratic) /
✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓

Page 27

20 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
staffing of the council and ensuring the work in different departments is co-
ordinated.
• The monitoring officer was established under the Local Government and Housing
Act 1989 and is responsible for ensuring that the council observes its governance
arrangements and operates legally.  This includes reporting on the legality of
matters, mal-administration, and the conduct of councillors and officers.
• The chief financial officer (section 95 officer or the senior financial officer) was
established under the Local Government (Scotland) Act 1973 and is responsible for
the financial affairs of the council.
• The chief social work officer was established under the Social Work (Scotland Act)
1968.  Councils are required to appoint a professionally qualified chief social work
officer to provide members and senior officers with effective, professional advice
about the delivery of social work services.
There are also a number of other statutory posts across services in line with
legislation.
RAG:    Chief Officer
(Finance) / Chief
Social Work Officer 
Employee Code of Conduct
The Code of Conduct is the standard which is applicable to all employees. While Chief
Officers have additional responsibilities, and many other professions within the council
work to dedicated professional standards (e.g. teaching or social care), the Employee
Code of Conduct should be considered as the foundation of the high standards
applicable to all. An introduction and commitment from the Chief Executive reinforces
this view. 
• March 2021: https://mars.northlanarkshire.gov.uk/egenda/images/att95750.pdf
• Available to employees on MyNL: https://mynl.co.uk/wpfd_file/employee-code-of-
conduct/ 
• A mandatory eLearning module on the Employee Code of Conduct has been
developed (on LearnNL) and a NLC Announcement was issued to staff in April 2023
regarding the new module and the need to complete it every two years.
Latest version: March 2021
Review timeframe: Annual
Assessment: The latest version of the Employee
Code of Conduct was approved in March 2021. 
This followed changes to the Homeworking Scheme
(Interim), introduced in September 2020 in direct
response to the pandemic, and reflected the
associated changes proposed to the Employee
Code of Conduct and Acceptable use of ICT
policies.
As per an Internal Audit Corporate Governance
report to the Audit and Scrutiny Panel in May 2023 [
https://mars.northlanarkshire.gov.uk/egenda/images
/att100378.pdf  ], there was a management
commitment to review / refresh this document and
consider the alignment and refresh of the Codes for
the former Culture NL and NL Leisure employees
(as appropriate) by October 2022.  The timescale
for completing this has now been extended to
September 2023.  
RAG: 
Chief Officer
(People Resources) ✓ ✓ ✓          ✓    ✓    
Conflicts of Interest Register
When an employee identifies a potential conflict of interest, they must complete the
relevant form after discussion with their line manager.  Employees must then submit
the form to their Chief Officer.  This must be done as soon as possible and within one
month of the conflict or potential conflict of interest. 
A new section in this respect was introduced to the Employee Code of conduct in May
2018: https://mars.northlanarkshire.gov.uk/egenda/images/att87964.pdf 
A Guidance document and templates are available on InsideNL: Conflicts of Interest
The guidance is reviewed annually in line with the Chief Officer’s Assurance
Statement and Checklist process.
Latest version: June 2023
Review timeframe: Annual
Assessment: In May 2018, the conflicts of interest
procedures was updated in the Employee Code of
Conduct.
A process is in place whereby Chief Officers are
required to submit their up to date Service Registers
annually (as part of the Chief Officer’s Assurance
Statement and Checklist process) for all their staff
for independent review and reporting to the CMT. 
The report in June 2023, advising of the annual
review and refresh to the Strategic Governance
Framework, provides the CMT with an annual
update in this respect. 
RAG: 
Chief Officer
(Business and
Digital)
✓ ✓ ✓              ✓    
Gifts and Hospitality Register
Employees are required to advise their line manager of any gifts or hospitality received
by them, or offered to them, in the course of their employment with the council.  After
discussing any gifts or hospitality received (or offered) with their line manager,
employees must complete and submit the relevant form to their Chief Officer.  This
must be done as soon as possible and within one month of being offered the gift or
hospitality. 
Further details on what should be recorded were included in the updated version of
the Employee Code of Conduct in May 2018:
https://mars.northlanarkshire.gov.uk/egenda/images/att87964.pdf   
A Guidance document and templates are available on InsideNL: Gifts and Hospitality
The guidance is reviewed annually in line with the Chief Officer’s Assurance
Statement and Checklist process.
Latest version: June 2023
Review timeframe: Annual
Assessment: In May 2018, procedures for gifts and
hospitality were updated in the Employee Code of
Conduct.
A process is in place whereby Chief Officers are
required to submit their up to date registers annually
(as part of the Chief Officer’s Assurance Statement
and Checklist process) for all their staff for
independent review and reporting to the CMT.  The
report in June 2023, advising of the annual review
and refresh to the Strategic Governance
Framework, provides the CMT with an annual
update in this respect.
RAG:  
Chief Officer
(Business and
Digital)
✓ ✓ ✓              ✓    
Councillors Code of Conduct Latest version: December 2021 Chief Officer (Legal ✓ ✓ ✓              ✓

Page 28

21 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
The Ethical Standards in Public Life etc. (Scotland) Act 2000 introduced a new ethical
framework for public life in Scotland. The Code of Conduct for Councillors came into
effect in May 2003.   
All Councillors elected to local authorities in Scotland must follow this statutory code of
conduct when carrying out their public duties.  This code is published on the council’s
website: https://www.northlanarkshire.gov.uk/your-council/councillors-and-
committees/your-councillor/councillors-code-conduct 
The Code of Conduct for Councillors is approved by the Scottish Parliament and
issued by Scottish Ministers.  The Standards Commission for Scotland is responsible
for the enforcement of the code of conduct. It also has responsibility for issuing
guidance to assist local authorities and councillors about the code of conduct and also
for hearing complaints about a councillor.  The latest code was published in December
2021:
https://www.standardscommissionscotland.org.uk/codes-of-conduct/councillors-code-
of-conduct 
Review timeframe: Review timeframes are set by
the Scottish Government as they are responsible for
setting the Councillors Code of Conduct.
Assessment: In 2020, the Scottish Government
held a consultation on a review of the Councillors'
Code of Conduct to seek views from relevant
stakeholders and members of the public.  The
council and the Standards Commission for Scotland
provided feedback as part of this exercise. 
Following this exercise, a new code was published
on 7th December 2021.
The new code and relevant guidance was shared 
with new and returning Elected Members in May
2022, with training provided on the content.
RAG:  
and Democratic)
Councillors registered interests
Under The Ethical Standards in Public Life etc (Scotland) Act 2000 (Register of
Interests) Regulations 2003, Councillors and other committee members are required
to give notice of any registrable interests. 
The list of registrable interests for each Elected Member is updated on the Councillor’s
Information System and published on the council’s website:
https://www.northlanarkshire.gov.uk/your-council/councillors-and-committees/your-
councillor/councillors-registered-interests 
Latest version: Ongoing statutory obligation set out
in the Councillor’s Code of Conduct
Review timeframe: Any changes to the process will
be advised nationally in line with the guidance
issued by the Standards Commission.
Assessment: Upon taking up their position as an
Elected Member, Councillors are required to give
notice to the Monitoring Officer of any registrable
interests at that point and for the previous 12
months.  Thereafter Elected Members are legally
required to inform the council’s Monitoring Officer of
any changes to their registrable interests within four
weeks of the change taking place.
Following the local government elections in May
2022 there was an obligation on every Elected
Member to complete and sign their register within 4
weeks of being elected.  
RAG: 
Chief Officer (Legal
and Democratic) ✓ ✓ ✓              ✓    
Declarations of interest
Standing agenda item number 1 on all agendas for Council and Committee meetings
is Declarations of Interest in terms of the Ethical Standards in Public Life Etc.
(Scotland) Act 2000. 
Any declarations made are recorded in the minutes.
Latest version: Ongoing statutory obligation set out
in the Councillor’s Code of Conduct
Review timeframe: Any changes to the process will
be advised nationally in line with the guidance
issued by the Standards Commission.
Assessment: Agenda / minutes of all committee
meetings show declarations of interest are sought,
and appropriate declarations are made and
recorded.
RAG: 
Chief Officer (Legal
and Democratic) ✓ ✓ ✓             ✓ ✓    
Open and transparent decision making
Dedicated section on the council’s website provides the public with information on
each of  the local Elected Members, the official council roles, minutes / agendas /
reports on MARS from committee meetings, standing orders and scheme of
administration, and a link to webcasts of committee meetings. 
March 2022: https://www.northlanarkshire.gov.uk/your-council/councillors-and-
committees 
Latest version: Live pages
Review timeframe: Ongoing
Assessment: Web pages continually updated as
and when new information becomes available. 
RAG: 
Chief Officer (Legal
and Democratic) ✓ ✓ ✓ ✓  ✓   ✓ ✓      ✓   ✓  
Corporate Anti-Fraud Policy and Response Plan  
An Anti-Fraud Policy and Fraud Response Plan is in place which sets out the council’s
expectations (that extend to all individuals and organisations with whom it deals) in
terms of acting honestly and with integrity and in safeguarding public resources. 
June 2017: https://mars.northlanarkshire.gov.uk/egenda/images/att86106.pdf
Latest version: June 2017
Review timeframe: A review was  undertaken of
the Corporate Anti-Fraud Policy and Fraud
Response Plan in June 2017. The review was
undertaken to ensure that the document remains
consistent with good practice and continues to
properly reflect how the council responds to fraud
following staffing and organisational changes since
the policy was last reviewed. The revised document
reflects changes to specific posts, organisational
structures, and revised management arrangements
for certain types of fraud.
Assessment: An Internal Audit review in May 2020
(https://mars.northlanarkshire.gov.uk/egenda/image
s/att94222.pdf) recommended that current corporate
anti-fraud policies and arrangements should be
reviewed and any identified actions necessary
Chief Officer (Audit
and Risk) ✓ ✓ ✓             ✓

Page 29

22 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
should be implemented to ensure the council’s
arrangements are more fully consistent with
recognised good practice.  As per an Internal Audit
Corporate Governance report to the Audit and
Scrutiny Panel in May 2023 [
https://mars.northlanarkshire.gov.uk/egenda/images
/att100378.pdf  ], a review of the council’s anti-fraud
arrangements (including a review of the policy) was
included in the 2022/23 annual Internal Audit Plan
and this assignment is now underway with a report
scheduled to be presented to the Policy and
Strategy Committee in October 2023.
RAG: 
Whistleblowing Procedure (Public Interests Disclosure)
The council’s Whistleblowing Procedure provides a mechanism for employees of the
council, and other workers within the council, to report a concern about serious
wrongdoing within the council and to do so with security and in confidence. 
• March 2023: https://mars.northlanarkshire.gov.uk/egenda/images/att99996.pdf 
• March 2022: https://mars.northlanarkshire.gov.uk/egenda/images/att97980.pdf 
The Whistleblowing Procedure is accessible to staff through MyNL:
https://mynl.co.uk/wpfd_file/whistleblowing-policy/ 
Latest version: March 2023
Review timeframe: Annual
Assessment: Latest review in March 2023 was
undertaken on the use of the Whistleblowing
Procedure and to identify any amendments required
to the Procedure.  The updated Procedure was
approved at Policy and Strategy Committee in
March 2023.
RAG: 
Chief Officer (Legal
and Democratic) ✓ ✓ ✓             ✓     
The Plan for North Lanarkshire
• Update on level 1 health check indicators that provide the latest North Lanarkshire
context in terms of the economic, social, health, environmental wellbeing of the
area, March 2023:
https://mars.northlanarkshire.gov.uk/egenda/images/att100085.pdf 
• Update on level 1 health check indicators and progress against Programme of Work,
March 2022: https://mars.northlanarkshire.gov.uk/egenda/images/att97996.pdf 
• Place based regeneration investment programme of work - The Place The Vision,
September 2021: https://mars.northlanarkshire.gov.uk/egenda/images/att96933.pdf
• Update on level 1 health check indicators and progress against Programme of Work,
March 2021: https://mars.northlanarkshire.gov.uk/egenda/images/att95824.pdf 
• Place based regeneration investment programme of work - March 2020:
https://mars.northlanarkshire.gov.uk/egenda/images/att93588.pdf
• The Plan for North Lanarkshire, February 2019:
https://mars.northlanarkshire.gov.uk/egenda/images/att90076.pdf   
• Published on the council’s website: https://www.northlanarkshire.gov.uk/your-
council/council-strategies-and-plans/council-strategies/plan-north-lanarkshire 
Latest version: The Plan for North Lanarkshire is a
long-term strategy with a long-term vision which was
approved in February 2019. 
Review timeframe: Annual
Assessment: The Programme of Work is the
delivery mechanism for The Plan for North
Lanarkshire; this is reviewed and updated annually. 
The most recent Programme of Work to 2028 was
approved at the Policy and Strategy Committee in
March 2023.  
The Plan for North Lanarkshire is supported by a
suite of high level Health Check Performance
Indicators that collectively provide the context for
North Lanarkshire as a place.  These are reviewed,
updated, and reported to the Policy and Strategy
Committee annually and inform the council’s
strategic planning process through the Programme
of Work.
RAG:  
Chief Executive  ✓    ✓  ✓ ✓  ✓     ✓      
Programme of Work
• Programme of Work to 2028 approved in March 2023:
https://mars.northlanarkshire.gov.uk/egenda/images/att100217.pdf 
• Programme of Work for 2022/23 approved in March 2022: 
https://mars.northlanarkshire.gov.uk/egenda/images/att97996.pdf 
• Programme of Work for 2021/22 approved in March 2021:
https://mars.northlanarkshire.gov.uk/egenda/images/att95824.pdf 
• Programme of Work for 2020 and beyond approved in March 2020:
https://mars.northlanarkshire.gov.uk/egenda/images/att93774.pdf 
• Inaugural Programme of Work approved in March 2019:
https://mars.northlanarkshire.gov.uk/egenda/images/att90396.pdf 
Latest version: Programme of Work to 2028
approved in March 2023.
Review timeframe: Annual update in cycle 1 each
year.
Assessment: Programme of Work comprises an
annual review and assessment process which
concludes with a report to committee in cycle 1 each
year. A CMT strategic planning session in April
2022 further reviewed the Programme of Work
arrangements and contents and identified future
developments required therein. The next annual
update is scheduled to be reported to committee in
cycle 1 of 2024. 
RAG: 
Chief Executive ✓    ✓  ✓ ✓  ✓     ✓ ✓     
Strategic Policy Framework
• Refreshed Strategic Policy Framework approved in March 2023:
https://mars.northlanarkshire.gov.uk/egenda/images/att100087.pdf
• Refreshed Strategic Policy Framework approved in March 2022:
https://mars.northlanarkshire.gov.uk/egenda/images/att97995.pdf 
• Inaugural Strategic Policy Framework approved in September 2018:
https://mars.northlanarkshire.gov.uk/egenda/images/att88711.pdf     
• Update provided to the Audit and Scrutiny Panel in November 2022: 
https://mars.northlanarkshire.gov.uk/egenda/images/att99349.pdf
• Update provided to the Audit and Scrutiny Panel in September 2021:
Latest version: Most recent update following
annual review and refresh process was approved at
committee in March 2023.
Review timeframe: Annual.
Assessment: The Strategic Policy Framework is
key in supporting the council’s Programme of Work
and, as such, is subject to an annual review and
refresh process to ensure the council’s strategies,
policies, and plans are kept up to date, aligned to
The Plan for North Lanarkshire, and reflect relevant
policy and legislation changes.  The annual update
Chief Officer
(Business and
Digital)
✓    ✓  ✓ ✓  ✓     ✓ ✓

Page 30

23 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
https://mars.northlanarkshire.gov.uk/egenda/images/att96915.pdf 
• Update provided to the Audit and Scrutiny Panel in September 2020:
https://mars.northlanarkshire.gov.uk/egenda/images/att94661.pdf  
of the Strategic Policy Framework is scheduled to
be reported to committee in cycle 1 of 2024. 
RAG: 
Strategic Performance Framework
The Strategic Performance Framework sets out performance measurement at three
levels in order to collectively provide an overview of performance (over time and
compared to targets) to help understand the impact of council activities on improving
services and outcomes for the people and communities of North Lanarkshire.  These
measures also allow for day to day activities, and progress towards achieving the
long-term vision set out in The Plan for North Lanarkshire, to be regularly monitored,
reported, assessed, and scrutinised.
• Approved in February 2019:
https://mars.northlanarkshire.gov.uk/egenda/images/att90076.pdf
• Detail reported in September 2019:
https://mars.northlanarkshire.gov.uk/egenda/images/att92050.pdf 
• Update provided to the Audit and Scrutiny Panel in November 2022: 
https://mars.northlanarkshire.gov.uk/egenda/images/att99349.pdf
• Update provided to the Audit and Scrutiny Panel in September 2021:
https://mars.northlanarkshire.gov.uk/egenda/images/att96915.pdf 
Update provided to the Audit and Scrutiny Panel in September 2020:
https://mars.northlanarkshire.gov.uk/egenda/images/att94661.pdf  
Latest version: November 2022
Review timeframe: Annual
Assessment: The Strategic Performance
Framework is key in supporting the council’s
Programme of Work and, as such, is subject to a
regular review and refresh process to ensure it
remains aligned to The Plan for North Lanarkshire.  
An update on all six of the strategic frameworks is
provided to the Audit and Scrutiny Panel annually.
The Strategic Performance Framework is currently
undergoing a review and update in line with the new
Programme of Work to 2028, with an update
scheduled to be reported in 2023/24.
RAG:  
Chief Officer
(Business and
Digital)   
✓   ✓   ✓  ✓   ✓  ✓    
Strategic Performance Framework - performance reporting schedule
Formal reporting arrangements are in place through an annual Performance Reporting
Schedule that comprises Chief Officer reviews at service committees, corporate
reporting, and service specific reporting to meet both business and statutory
obligations.  This is underpinned by five non-negotiable standards that inform a
regular performance assurance review process. 
• Performance Reporting Schedule for 2023 to 2023 reported to the Audit and
Scrutiny Panel in February 2023:
https://mars.northlanarkshire.gov.uk/egenda/images/att99866.pdf 
• Reporting Schedule - March 2021:
https://mars.northlanarkshire.gov.uk/egenda/images/att95860.pdf 
• Performance assurance review, May 2023:
https://mars.northlanarkshire.gov.uk/egenda/images/att100418.pdf 
Latest version: February 2023
Review timeframe: Annual 
Assessment: Annual performance reporting
schedule includes a list of Chief Officer reviews at
service committees, corporate reporting, and
service specific reporting to meet both business and
statutory obligations scheduled for each committee
cycle for 2023 to 2034.  
This includes the ALEO performance assurance
report which is submitted to the Audit and Scrutiny
Panel on a six monthly basis.
A performance assurance review process is in place
which assesses the reports on the schedule against
the five non-negotiable standards; this is reported to
the Audit and Scrutiny Panel on a six monthly basis.
RAG:  
Chief Officer
(Business and
Digital) / 
all Chief Officers   
✓   ✓   ✓  ✓   ✓  ✓ ✓  ✓ 
Strategic Governance Framework
• Refreshed Strategic Governance Framework approved in September 2022:
https://mars.northlanarkshire.gov.uk/egenda/images/att98532.pdf 
• Refreshed Strategic Governance Framework approved in September 2021:
https://mars.northlanarkshire.gov.uk/egenda/images/att96686.pdf 
• Initial Strategic Governance Framework approved in February 2020:
https://mars.northlanarkshire.gov.uk/egenda/images/att92927.pdf 
• Update provided to the Audit and Scrutiny Panel in November 2022: 
https://mars.northlanarkshire.gov.uk/egenda/images/att99349.pdf 
• Update provided to the Audit and Scrutiny Panel in September 2021:
https://mars.northlanarkshire.gov.uk/egenda/images/att96915.pdf 
• Update provided to the Audit and Scrutiny Panel in September 2020:
https://mars.northlanarkshire.gov.uk/egenda/images/att94661.pdf   
Latest version: Most recent update following
annual review and refresh process was approved at
committee in September 2022.
Review timeframe: Review and update undertaken
annually in order to inform the production of the
Annual Governance Statement
Assessment: The Strategic Governance
Framework is key in supporting the council’s
Programme of Work and, as such, is subject to an
annual review and refresh process to ensure
ongoing alignment to The Plan for North
Lanarkshire, and to inform the production of the
Annual Governance Statement.  The next annual
update of the Strategic Governance Framework is
scheduled to be reported to committee in June
2023.
RAG:  
Chief Officer
(Business and
Digital)
✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ 
Annual Governance Statement
• Annual Governance Statement reported to the Audit and Scrutiny Panel in
September 2022:
https://mars.northlanarkshire.gov.uk/egenda/images/att98533.pdf (with there
being no council committees held in cycle 2 of 2022, it was permitted to submit the
Statement to the next available committee meeting).
• Annual Governance Statement reported to the Audit and Scrutiny Panel in June
2021: https://mars.northlanarkshire.gov.uk/egenda/images/att96418.pdf 
• Annual Governance Statement reported to the Audit and Scrutiny Panel in
September 2020:
https://mars.northlanarkshire.gov.uk/egenda/images/att94514.pdf 
Latest version: Annual Governance Statement for
2021/22 reported to the Audit and Scrutiny Panel in
September 2022
Review timeframe: Annual
Assessment: Annual Governance Statement
requires to be produced each year in line with the
Delivering Good Governance in Local Government:
Framework and included in the annual accounts
each year in line with The Local Authority Accounts
(Scotland) Regulations 2014.  Statement for
2022/23 was presented to CMT in June 2023 to
allow for inclusion in unaudited Annual Accounts for
Chief Executive /
Chief Officer
(Business and
Digital)
✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓

Page 31

24 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
2022/23 and submission to external auditors by end
June 2023.
RAG: 
Project Management Framework 
The council’s Project Management Framework aims to ensure a systematic approach
across the organisation by providing a corporate framework and guidance that
enables each stage of delivery towards achieving the overall objectives of a project to
be planned, guided, implemented, and governed. 
• Project Management Framework (2022) and templates on InsideNL: Project
Management Framework 
• Updates provided to the Audit and Scrutiny Panel in November 2022: 
https://mars.northlanarkshire.gov.uk/egenda/images/att99349.pdf and February
2023: https://mars.northlanarkshire.gov.uk/egenda/images/att99869.pdf 
• Updated provided to the Audit and Scrutiny Panel in September 2021:
https://mars.northlanarkshire.gov.uk/egenda/images/att96915.pdf 
• Update provided to the Audit and Scrutiny Panel in November 2019 in terms of
governance arrangements for the project management model:
https://mars.northlanarkshire.gov.uk/egenda/images/att92361.pdf  
Latest version: New Framework launched council
wide December 2022.  
Review timeframe: Annual 
Assessment: The Project Management Framework
is key in supporting the council’s Programme of
Work and, as such, is subject to a regular review
and refresh process to ensure ongoing alignment to
The Plan for North Lanarkshire.  
The 2022 review aimed to ensure that the council’s
arrangements remained fit for purpose and able to
effectively support delivery of The Plan for North
Lanarkshire.  This followed recommendations
arising from Internal Audit reports on managing
strategic change and the governance of capital
projects.  The review was also considered
necessary in light of the changes in the council’s
operating environment since the implementation of
the Model in 2018.  These changes had led to a
rapid evolution of programmes and projects across
the council, as well as increasing complexities in the
delivery of many of these, and a growing need for
good governance and good project management to
set up and deliver a wider range of projects at pace
and scale (particularly during the pandemic), and
ensure these are well-directed, delivered to time,
cost, and quality targets, and provide the expected
benefits and improved local outcomes.  
RAG: 
Chief Officer
(Business and
Digital)   
✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓  ✓  ✓     
Strategic Self-Evaluation Framework
• Refreshed Strategic Self-Evaluation Framework was presented to the Audit and
Scrutiny Panel in November 2022:
https://mars.northlanarkshire.gov.uk/egenda/images/att99350.pdf 
• Refreshed Strategic Self-Evaluation Framework was presented to the Audit and
Scrutiny Panel in September 2021:
https://mars.northlanarkshire.gov.uk/egenda/images/att96743.pdf 
• Approved in February 2019:
https://mars.northlanarkshire.gov.uk/egenda/images/att90076.pdf 
• Update provided to the Audit and Scrutiny Panel in November 2022: 
https://mars.northlanarkshire.gov.uk/egenda/images/att99349.pdf 
• Updated provided to the Audit and Scrutiny Panel in September 2021:
https://mars.northlanarkshire.gov.uk/egenda/images/att96915.pdf 
• Update provided to the Audit and Scrutiny Panel in September 2020:
https://mars.northlanarkshire.gov.uk/egenda/images/att94661.pdf
Latest version: Refreshed Strategic Self-Evaluation
Framework and rolling review programme presented
to the Audit and Scrutiny Panel in November 2022.
Review timeframe: Annual 
Assessment: The Strategic Self-Evaluation
Framework is key in supporting the council’s
Programme of Work and, as such, is subject to an
annual review and refresh process to ensure
improvement actions remain aligned to The Plan for
North Lanarkshire.  
The annual update of the Strategic Self-Evaluation
Framework is scheduled to be reported to
committee in cycle 4 of 2023.
RAG: 
Chief Officer
(Business and
Digital)
✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
Financial Strategy 
As the overarching framework that establishes the financial strategies and policies
which ensure effective financial governance, planning, and management, this sets out
the responsibility for safeguarding public funds within North Lanarkshire Council and
the role of the Section 95 Officer.  
The strategies and policies covered by the Financial Strategy are the Capital Strategy,
Treasury Management Strategy, Revenue Budget Strategy, Medium-Term Financial
Plan, and the Financial Regulations and Scheme of Financial Delegation. 
June 2019: https://mars.northlanarkshire.gov.uk/egenda/images/att90922.pdf  
Latest version: August 2022
Review timeframe: The strategies and policies
covered by the Financial Strategy are set out therein
along with timescales for further review.  All have an
annual review frequency.
Assessment: All strategies and policies covered by
the Financial Strategy are shown separately in this
table.
The Financial Strategy itself was reviewed in August
2022 and, as reported to the CMT, it was concluded
that the Strategy remains relevant in its current form
and therefore no further update requires to be
reported to committee at this time.  
RAG: 
Chief Officer
(Finance)   ✓     ✓  ✓ ✓  ✓  ✓ ✓  ✓   
Treasury Management Strategy 
Each year, in line with the CIPFA Code of Practice on Treasury Management, the
council produces a Treasury Management Strategy. The Treasury Strategy Statement
sets out the policies, practices, and activities undertaken by the council in compliance
with the Code.  It covers the council’s debt and investment projections, expected
Latest version: March 2023
Review timeframe: Annual
Assessment: The latest version of the Treasury
Management Strategy approved in March 2023
covers the period from 2023 to 2024.  This report
Chief Officer
(Finance)   ✓     ✓  ✓ ✓  ✓  ✓ ✓  ✓

Page 32

25 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
movement in interest rates, council borrowing and investment strategies, policy on
repayment of loans funds advances, and treasury management and prudential
indicators.
• March 2023: https://mars.northlanarkshire.gov.uk/egenda/images/att100207.pdf 
• March 2022: https://mars.northlanarkshire.gov.uk/egenda/images/att97874.pdf 
• March 2021: https://mars.northlanarkshire.gov.uk/egenda/images/att95752.pdf   
Treasury Management monitoring reports are submitted to committee quarterly.  This
fulfils the requirements in accordance with the CIPFA Code of Practice on Treasury
Management and the CIPFA Prudential Code for Capital Finance in Local Authorities.
It informs on Treasury Management activity for the latest quarter and compliance with
the mandatory treasury and prudential indicators.  
• Quarter ended March 2023: 
https://mars.northlanarkshire.gov.uk/egenda/images/att100686.pdf 
The Treasury Management Annual Activity report also fulfils the key requirements in
accordance with the CIPFA Code of Practice on Treasury Management and the
CIPFA Prudential Code for Capital Finance in Local Authorities in that it outlines the
treasury management activity undertaken during the latest financial year and the
resulting impact on the council’s borrowing and investment strategy.  It also reports on
the council’s performance in complying with the mandatory prudential indicators, and
provides a detailed summary of performance, making reference to those targets and
prudential indicators set at the start of the year within the approved strategy.  
• September 2022:
https://mars.northlanarkshire.gov.uk/egenda/images/att98651.pdf 
• September 2021:
https://mars.northlanarkshire.gov.uk/egenda/images/att96857.pdf
fulfils the key requirements of the Local Government
Act 2003 in that it outlines the Treasury
Management Strategy for 2023/24 in accordance
with the CIPFA Code of Practice on Treasury
Management, and reports on the treasury and
prudential indicators as required by the above code
and the CIPFA Prudential Code for Capital Finance
in Local Authorities.
RAG: 
Reserves Policy
To support the commitments made by both the Financial Strategy and Revenue
Resources Budget Strategy, a Reserves Policy was approved in January 2020.  The
policy is subject to annual review to ensure available balances are managed and
utilised in accordance with effective governance principles and continue to support
financial plans which are affordable and sustainable.  Any significant amendments to
the policy are reported to committee. 
January 2020: https://mars.northlanarkshire.gov.uk/egenda/images/att92779.pdf  
Latest version: January 2020
Review timeframe: Annual
Assessment: The Reserves Policy was approved in
January 2020.  The annual review process since
has identified no further changes and concluded
that the original Reserves Policy remains valid and
therefore no further update is required at the time.  
RAG: 
Chief Officer
(Finance)   ✓     ✓  ✓ ✓  ✓  ✓ ✓  ✓   
Revenue Resources Budget Strategy
To facilitate a more strategic approach to establishing budgets and associated savings
options, a Revenue Resources Budget Strategy was approved in June 2019. This set
out the rationale for the development of a revised approach to budgeting and the
identification of future savings.  It sets out guiding principles and an outline framework
to develop the Strategy to ensure alignment with The Plan for North Lanarkshire.
• June 2019: https://mars.northlanarkshire.gov.uk/egenda/images/att90956.pdf 
The Revenue Resources Budget Strategy has been reviewed and updated annually
since.
• September 2022: https://mars.northlanarkshire.gov.uk/egenda/images/att98764.pdf 
• June 2021: https://mars.northlanarkshire.gov.uk/egenda/images/att96162.pdf
• June  2020: https://mars.northlanarkshire.gov.uk/egenda/images/att94063.pdf 
Update reports on the implementation of savings are provided:
• March 2023 - Review of 2022/23 budget savings:
https://mars.northlanarkshire.gov.uk/egenda/images/att100054.pdf 
• September 2022 - Review of 2022/23 budget savings:
https://mars.northlanarkshire.gov.uk/egenda/images/att98648.pdf 
Latest version: September 2022
Review timeframe: Annual
Assessment: The Revenue Resources Budget
Strategy was approved in June 2019, with an
update provided annually thereafter given the
significantly increased financial risks faced by the
council.  
The latest update report (September 2022) set out
some of the high level challenges faced by the
council (in particular continued recovery from the
pandemic and the current economic and financial
environment) and how these will need to be
addressed in line with the Revenue Resources
Budget Strategy.  The report recognised that unless
there is any significant change which impacts on the
validity of the key principles, no further updates on
the implementation of the Strategy will be required.  
An update will be provided to committee in cycle 3
of 2023 and cycle 1 of 2024 on the implementation
of savings.  
RAG: 
Chief Officer
(Finance)   ✓     ✓  ✓ ✓  ✓  ✓ ✓  ✓   
4-weekly revenue monitoring reports
The council’s revenue budget is subject to close monitoring throughout the financial
year, with service’s reporting their own position to their relevant Service Committees
and Management Teams. 
A council summary report is prepared on a 4-weekly basis and consolidates the
budget monitoring position of all General Fund Services, along with the Housing
Revenue Account, and Adult Health and Social Care.  This report highlights and
explains major variances as per the council’s approved Financial Regulations and is
reported to both the BMT and committee.  Revenue monitoring reports are standing
items on the CMT agenda.
• Latest - Revenue Monitoring Report Council Summary 1 April 2022 to 3 March
2023 (Period 12), May 2023:
https://mars.northlanarkshire.gov.uk/egenda/images/att100693.pdf 
Latest version: Period end report in May 2023 and
annual report for 2021/22 in September 2022
Review timeframe: As at each period end and as at
the year end.
Assessment: Revenue budget monitoring reports
are submitted to committees each cycle throughout
the year and at the year end.
RAG: 
Chief Officer
(Finance)   ✓     ✓  ✓ ✓  ✓  ✓ ✓  ✓

Page 33

26 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
A consolidated council annual Provisional Outturn Revenue monitoring report is
provided to CMT each year.  This updates CMT on the overall position for the General
Fund Account, Housing Revenue Account, and Adult Health and Social Care for the
financial year just ended.   
The council summary report is supported by individual service reports which are
reported to Service Committees / Service Management Teams.  These reports include
analysis of significant budget variations, impact of COVID, budget savings, and
earmarked reserves.   
An Annual Accounts final outturn is reported to committee each year after the
completion of the draft accounts.
• September 2022:
https://mars.northlanarkshire.gov.uk/egenda/images/att98646.pdf 
Annual Revenue Budget and Council Tax 
The statutory requirements in relation to budget setting are contained within Section
93 of the Local Government Finance Act 1992.  An annual report provides financial
information to enable the council to set its Revenue Budget and Council Tax for the
year. 
February 2023: https://mars.northlanarkshire.gov.uk/egenda/images/att99981.pdf 
Latest version: February 2023
Review timeframe: Annual
Assessment: Report approved in February 2023
set the Revenue Budget and Council Tax for
2023/24 and outlined the updated forecast budget
position for 2024/25 and 2025/26.
The principle of setting a three year (rolling) budget
is key in supporting the council’s Programme of
Work and, as such, is scheduled for a report to
committee in cycle 1 in each year.
RAG: 
Chief Officer
(Finance)   ✓     ✓  ✓ ✓  ✓  ✓ ✓  ✓   
Medium-Term Financial Plan
Longer term planning is integral to the council’s Financial Strategy and the council’s
strategic approach to budgeting. Effective decision making relies on strong financial
planning and the Medium-Term Financial Plan assists in ensuring resources are
aligned to the key priorities outlined in The Plan for North Lanarkshire and ensures the
Programme of Work is robust, affordable, and sustainable.  The Medium-Term
Financial Plan reflects the risks which may impact on the council’s ability to continue
to provide high quality services focussing on the strategic priorities. 
The Medium-Term Financial Plan was approved at committee in September 2019, this
is a 5 year rolling plan:
https://mars.northlanarkshire.gov.uk/egenda/images/att92055.pdf   
The plan has subsequently been reviewed and updated annually:
• June 2023:  https://mars.northlanarkshire.gov.uk/egenda/images/att100799.pdf 
• September 2022:
https://mars.northlanarkshire.gov.uk/egenda/images/att98767.pdf 
• September 2021:
https://mars.northlanarkshire.gov.uk/egenda/images/att96882.pdf
• October 2020: https://mars.northlanarkshire.gov.uk/egenda/images/att94530.pdf 
Taking the previously reported position as the new baseline, the latest plan updates
financial planning assumptions in relation to future revenue grant and other funding
sources, along with increased cost pressures arising from employee costs, inflation,
and policy decisions. A range of risk-based scenarios have been considered, resulting
in envisaged, pessimistic and optimistic positions. 
Latest version: June 2023
Review timeframe: Annual
Assessment: The Medium-Term Financial Plan
approved in June 2023 covers the period 2024/25 to
2028/29. This provides an early update on the five
year financial forecast and outlines the challenges
facing the council in maintaining medium-term
financial stability, while achieving the strategic
priorities of the council and reflecting the impact of
the pandemic.
The Medium-Term Financial Plan is key in
supporting the council’s Programme of Work and,
as such, an annual review is undertaken of the
planning assumptions in the council’s Medium-Term
(five-year) Financial Plan and an update of the
scenarios relating to the anticipated budget position.
A financial outlook update scheduled to be reported
to committee in cycle 3 of 2023 and the annual
update to the five year Medium Term Financial Plan
will be reported to committee in cycle 2 of 2024.
RAG: 
Chief Officer
(Finance)   ✓     ✓  ✓ ✓  ✓  ✓ ✓  ✓   
Capital Strategy
Following the publication of the revised Prudential Code for Capital Finance in Local
Authorities 2017, there is a requirement for councils to produce a Capital Strategy. 
The Capital Strategy to 2022/23 was approved in March 2019:
https://mars.northlanarkshire.gov.uk/egenda/images/att90194.pdf 
An update in March 2020 reported on the annual review of the strategy:
https://mars.northlanarkshire.gov.uk/egenda/images/att93556.pdf which requires to be
undertaken in accordance with the Prudential Code requirements.   
Latest version: March 2020
Review timeframe: Annual
Assessment: The annual review of the Capital
Strategy approved in March 2020 covers the period
to 2022/23. 
The Capital Strategy is key in supporting the
council’s Programme of Work and creating an asset
base that supports delivery of The Plan for North
Lanarkshire and which delivers on the shared
ambitions and the Programme of Work.
Given the council’s current work to progress a new
Strategic Capital Investment Programme from April
2024, it was agreed that the existing strategy should
continue throughout 2023/24 to ensure that the
revised strategy aligns with the updated Programme
of Work.
The revised Capital Strategy will be presented to
committee in cycle 1 of 2024 alongside the new
Strategic Capital Investment Programme.  This
update will include a review of the key principles
and reflect the requirements of the new Prudential
Chief Officer
(Finance)   ✓     ✓  ✓ ✓  ✓  ✓ ✓  ✓

Page 34

27 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
Code for Local Authorities.
RAG: 
Strategic Capital Investment Programme
The principles of the council’s strategic capital investment programme are
underpinned by the Capital Strategy. 
Following the review of the Capital Strategy in March 2020, the main principles
outlined and adopted within the Strategy remained unchanged apart from minor
updates - the Strategic Capital Delivery Group (SCDG) terms of reference were
updated to incorporate all capital investment programmes.  The principles of the
Capital Strategy are adopted in preparing the revised annual Strategic Capital
Investment Programme. 
The latest update to the Strategic Capital Investment Programme for 2023/24 to
2025/26 was approved at committee in March 2023:
https://mars.northlanarkshire.gov.uk/egenda/images/att100227.pdf 
Annual Community Investment Fund progress report:
September 2022: https://mars.northlanarkshire.gov.uk/egenda/images/att98766.pdf 
Latest version: March 2023
Review timeframe: Annual
Assessment: Strategic Capital Investment
Programme approved in March 2023 covers the
period from 2023/24 to 2025/26. 
The Strategic Capital Investment Programme is key
in supporting the council’s Programme of Work and,
as such, monitoring reports are scheduled to be
provided to committee each cycle; this includes
elements funded by the Community Investment
Fund managed by the Strategic Capital Delivery
Group.  
The Strategic Capital Delivery Group has
commenced work on the development of a new
Strategic Capital Investment Programme from
2024/25 to 2028/29.  This will ensure continued
alignment between capital investment and the
revised Programme of Work.
In addition, an annual Community Investment Fund
progress report is scheduled to be reported to
committee in cycle 3 of 2023.  This will outline
updated financial projections linked to emerging
economic trends.
RAG: 
Chief Officer
(Finance)   ✓     ✓  ✓ ✓  ✓  ✓ ✓  ✓   
Strategic Capital Delivery Group  (SCDG) terms of reference and
governance framework
The SCDG is an officer working group convened of senior officers with responsibility
for the development and delivery of the council’s long-term capital programme. 
The Terms of Reference and Governance Framework allow the SCDG to make
amendments to the approved capital programme subject to limits, adjustments to the
programme to reflect future capital grant allocations, the approval of virement of
resources, and additional projects plus the process for reporting decisions and
recommendations to committee. 
• March 2023: https://mars.northlanarkshire.gov.uk/egenda/images/att100227.pdf 
• September 2021:
https://mars.northlanarkshire.gov.uk/egenda/images/att96942.pdf 
Latest version: March 2023
Review timeframe: Terms of Reference reviewed
in line with the requirements of the Strategic Capital
Investment Programme.
Assessment: An update to the Terms of Reference
were approved at the Policy and Strategy
Committee in March 2023 to reflect the revised
management team and organisational structure
(approved at Policy and Strategy Committee in
December 2022) and ensure it properly reflects the
council’s current organisational structure.
RAG: 
Chief Officer
(Finance)  
✓     ✓  ✓ ✓  ✓  ✓ ✓  ✓   
Strategic Capital Delivery Group (SCDG)
Meetings are held each quarter as a minimum.
Minutes and meeting papers available.   
Latest version: Recurring group.
Review timeframe: Strategic Capital Delivery
Group in operation; chaired by Depute Chief
Executive.
Assessment: Effectiveness of the group reviewed
in line with the council’s Strategic Capital
Investment Programme.  
RAG: 
Depute Chief
Executive / Chief
Officer (Finance)  
✓     ✓  ✓ ✓  ✓  ✓ ✓  ✓   
Capital monitoring
The capital programme is monitored and managed by the council’s Strategic Capital
Delivery Group.  Consolidated council monitoring reports are prepared regularly and
provide an update on the resources and expenditure for the council’s Capital
Programmes.   
The close monitoring facilitates the group’s proper management of the council’s
ambitious capital programme, including the realignment of resources to ensure its
effective delivery and ensuring resources are directed to where they are most required
and informs updates to elected members through committee where appropriate. 
Capital programme monitoring reports are standing items on the BMT agenda every 4
weeks.  These reports include projected outturns, budget variations, savings,
earmarked reserves, and commitments.  Reports are also submitted to committee
each cycle.  These provide an update on the latest year’s resources and expenditure
for the council's Strategic Capital Investment Programme. The report also shows the
latest financial year’s provisional outturn position and the resultant variances as at the
period end. 
• Latest - Capital Programme 2022/23 Monitoring Report, March 2023:
https://mars.northlanarkshire.gov.uk/egenda/images/att100051.pdf 
Latest version: Period end report in March 2023
and annual report for2022/23 in May 2023.
Review timeframe: As at each period end and as at
the year end.
Assessment: Capital monitoring reports are
submitted to committee each cycle throughout the
year and at the year end.
RAG:
Chief Officer
(Finance)   ✓     ✓  ✓ ✓  ✓  ✓ ✓  ✓

Page 35

28 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
An annual Provisional Outturn Capital Monitoring report is provided to the Strategic
Capital Delivery Group (SCDG) each year (latest on 27/04/23).  This provides an
update on the latest financial year’s resources and expenditure for the council's capital
programmes. The report also shows the year end provisional outturn position and the
resultant variances.
• Capital Programme 2022/23 Monitoring Report, May 2023:
https://mars.northlanarkshire.gov.uk/egenda/images/att100688.pdf
Annual accounts
The preparation of the Accounts is a key statutory responsibility for Finance and the
council. The Local Authority Accounts (Scotland) Regulations 2014 require the council
to prepare Annual Accounts, section 12 of the Local Government in Scotland Act 2003
requires these to be prepared in accordance with proper accounting practices,
primarily the Code of Practice on Local Authority Accounting in the United Kingdom,
supported by International Financial Reporting Standards (IFRS), and statutory
guidance issued. 
In the midst of the ongoing pandemic, Local Government Finance Circular 10/2020
was issued, providing flexibility within the Regulations in line with The Coronavirus
(Scotland) Act 2020, this included flexibility in the timescales for publication of the
Unaudited Accounts and the subsequent approval of the Audited Accounts for
2019/20. The Local Authority (Capital Finance and Accounting) (Scotland)
(Coronavirus) Amendment Regulations 2021 subsequently extended this for the
2021/22 publication. 
• Annual Accounts (audited) - October 2022
https://mars.northlanarkshire.gov.uk/egenda/images/att99220.pdf 
• Annual Accounts (audited) - December 2021
https://mars.northlanarkshire.gov.uk/egenda/images/att97493.pdf  
• Annual Accounts are published on the council’s website:
https://www.northlanarkshire.gov.uk/your-council/facts-and-figures/annual-accounts  
Latest version: October 2022
Review timeframe: Annual
Assessment: The preparation of the Annual
Accounts is a key statutory responsibility for the
council.  The audited annual Accounts for 2021/22
were approved by the Audit and Scrutiny Panel in
October 2022 for signing.
The unaudited Annual Accounts for 2021/22 were
presented to the external auditors by end June
2022, in line with statutory requirements.  With there
being no committees during cycle 2 of 2022 (due to
the local government elections), the unaudited
Accounts for 2021/22 were approved by the Audit
and Scrutiny Panel in September 2022..  
RAG: 
Chief Officer
(Finance)   ✓     ✓  ✓ ✓  ✓  ✓ ✓  ✓ ✓ ✓ ✓
Risk Management Strategy
The Risk Management Strategy outlines that effective risk management arrangements
form an important element of good corporate governance and are designed to ensure
that the council operates systematic and logical processes for managing business
risks within a comprehensive framework, ensuring that identified risks are managed
consistently, effectively, efficiently and coherently across the organisation. 
March 2023: https://mars.northlanarkshire.gov.uk/egenda/images/att100082.pdf
Latest version: March 2023
Review timeframe: 3 year strategy.
Assessment: Risk Management Strategy approved
in March 2023 covers the period 2023 to 2026.  
An item within the Strategic Policy Framework, the
Risk Management Strategy is next scheduled for
review in 2025/26. 
In addition, reports are scheduled to be submitted to
the Audit and Scrutiny Panel each cycle to develop
and regularly assess the effectiveness of the risk
management arrangements which the council has in
place to assist the identification and management of
risks, strengthen organisational resilience, improve
governance and stakeholder confidence and trust,
increase the likelihood of the council achieving its
planned outcomes, priorities, ambitions, and report
the results of that assessment to key stakeholders.
RAG:  
Chief Officer (Audit
and Risk)       ✓  ✓ ✓ ✓   ✓ ✓ ✓  ✓   
Workforce for the Future Strategy
Workforce for the Future Strategy approved in March 2020 covers the period 2020-23.   
• March 2020: https://mars.northlanarkshire.gov.uk/egenda/images/att92786.pdf 
This Strategy was subsequently refreshed in June 2021 and realigned in light of the
pandemic, which had a major impact on levels of employment and the needs of
employers across North Lanarkshire. It also addressed the issue that the pandemic is
expected to have adversely affected the wider employment, training, and progression
prospects of young people and other residents who been made redundant or may be
at risk when the furlough scheme ended.
• June 2021: https://mars.northlanarkshire.gov.uk/egenda/images/att96241.pdf 
A further update was submitted to committee in March 2022 to reflect recent work and
ensure this continues to identify and directly address critical labour market and
employment challenges and opportunities across North Lanarkshire. This report saw
approval granted for:
• Further progression of an NL Employer Charter Scheme, to fully engage businesses
in North Lanarkshire as key partners in the labour market recovery.
• Further work to deliver accelerated service improvements in processes for tracking
young people post-school and engaging more systematically with business on
capturing their workforce needs to ensure a fully end to end service delivery
capability is in place.
• A test of change proposal to engage directly with a new business investing in North
Lanarkshire, in an innovative partnership approach which ensures the council plays
Latest version: March 2022
Review timeframe: Annual
Assessment: This area of work will be subsumed
into the revised Programme of Work approved at
Policy and Strategy Committee in March 2023 under
the Brighter Futures programme.  The scope and
key deliverables for the Brighter Futures programme
of work is scheduled to be reported to Policy and
Strategy Committee in September 2023.
RAG:
Chief Officer
(People Resources)        ✓    ✓ ✓

Page 36

29 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
a key role in supporting that business to build a workforce for the future.
March 2022: https://mars.northlanarkshire.gov.uk/egenda/images/att97969.pdf
Workforce plans
Best Value guidance requires that councils demonstrate effective use of resources.  In
terms of staff this means: 
• A workforce strategy is in place that sets out expectations on how the local
authority’s staff will deliver its vision, priorities, and values.
• The strategy is translated into workforce plans, covering employee numbers,
skills, knowledge, competencies, and organisational structures that demonstrate
how staff will be deployed to deliver the services planned for the future. 
• Plans are regularly reviewed at appropriate intervals according to a clear review
cycle.
Latest version: April 2022
Review timeframe: Annual
Assessment: Chief Officer workforce plans were
considered at CMT in April 2022.  Refinement of
plans to be undertaken and a council wide summary
is scheduled to be presented to Policy and Strategy
Committee in cycle 4 of 2023.
RAG: 
Chief Officer
(People Resources)            ✓         
General Contract Standing Orders (GCSO)
GCSO are a legal requirement and provide the powers to control and regulate
procurement throughout the council.  The GCSO also place requirements on service
areas to effectively plan and manage the resulting contracts. 
• The GSCO have subsequently been updated and version 16 - effective from 1 June
2022; this is available on InsideNL: Procurement
• These are also available on the council’s website:
https://www.northlanarkshire.gov.uk/business/procurement/key-procurement-
documents
• June 2018: https://mars.northlanarkshire.gov.uk/egenda/images/att88119.pdf   
Latest version: The current General Contract
Standing Orders (GCSO) were approved at the
former Policy and Resources Committee in June
2018.  These have subsequently been updated and
version 16 - effective from 1 June 2022 - is now
available.
Review timeframe:  The GCSO require to be kept
under regular review to ensure they work effectively
and secure continuous improvement and Best
Value.
Assessment: Further reviews will be undertaken in
line with any legislative changes or national
guidance issued. 
RAG: 
Chief Officer
(Assets and
Procurement) 
✓ ✓             ✓     
Procurement Strategy
In order to demonstrate Best Value, local authorities are required to comply with legal
and best practice requirements in the procurement and strategic commissioning of
goods, services, and works, including the Scottish Model of Procurement and ensure
there is clear accountability within procurement and commissioning arrangements.
The Procurement Reform (Scotland) Act 2014 requires Scottish public bodies with
annual procurement spend greater than £5 million (which includes the council) to
develop and publish an organisational procurement strategy and keep the strategy
under regular review; the council is also required to publish and prepare an annual
report. 
• Strategy - September 2022:
https://mars.northlanarkshire.gov.uk/egenda/images/att98662.pdf
• Annual report - September 2022:
https://mars.northlanarkshire.gov.uk/egenda/images/att98654.pdf
• Strategy - November 2021:
https://mars.northlanarkshire.gov.uk/egenda/images/att97297.pdf 
• Annual report - September 2021:
https://mars.northlanarkshire.gov.uk/egenda/images/att96865.pdf 
Latest version: September 2022
Review timeframe: Annual
Assessment: Introduced in August 2017 and
updated annually thereafter, the Procurement
Strategy approved at committee in September 2022
covers the period from 2023 to 2024.  The latest
annual report for 2021/22 was approved at
committee in September 2022.  An item within the
Strategic Policy Framework, the Procurement
Strategy is due to be updated and reported to
committee by cycle 4 each year.
Reports submitted to committee each cycle update
on procurement activity in terms of contracts
awarded below committee approval threshold and
contracts with variations. 
RAG: 
Chief Officer
(Assets and
Procurement) 
✓ ✓             ✓     
Climate change - committing to net zero 
The council recognises the need for urgent action and, as such, declared a Climate
Emergency in June 2019 advancing the net zero target from 2045 to 2030.  Similarly
the council became a signatory of the Edinburgh Biodiversity Declaration in June
2021, recognising the need to protect nature as well as the important role it will play in
tackling climate change.
The risk of climate change to the local economy is considered significant and therefore
as well as being the right thing to do, any deliberate interventions will benefit North
Lanarkshire. Actions delivered should consider the impact on the vulnerable such as
those likely to become fuel poor and ensure that these households are not negatively
impacted on.
Post-COP26 (the 26th United Nations Climate Change Conference held in 2021) and
the Glasgow Pact, the council (through its Climate Plan ACT2030) will continue to
develop its overall climate strategy to encourage internal and external action
(mitigation, adaptation, and sustainability) to tackle and prevent further climate
change. 
Medium and long-term aims are as set out in the Climate Plan ACT2030 (approved in
February 2022) - this encompasses the council’s own climate emergency declaration
and its subsequent target of net-zero emissions by 2030.  The climate plan therein
provides targets supported by thematic carbon budgets from 2021/22 to 2025/26 with
a commitment to continually review and set targets beyond this to 2030.
• February 2022: Climate Plan: Action on Climate Together 2030
https://mars.northlanarkshire.gov.uk/egenda/images/att97673.pdf 
Latest version: February 2023
Review timeframe: Annual
Assessment: Each year, an annual report is
produced on the council’s compliance with the
public sector climate change duties and the status
of the council in terms of achieving net zero by
2030.
RAG: 
Chief Officer
(Assets and
Procurement)       
✓

Page 37

30 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
The Climate Change (Duties of Public Bodies; Reporting Requirements) (Scotland)
Order 2015  introduced a legal obligation for public bodies to report annually detailing
their compliance with the duties specified in the Climate Change (Scotland) Act 2009
and its subsequent amendments. The report is produced annually for the most
recently completed financial year with a submission date of 30th November each year.
The annual submission requires the council to demonstrate that, as a public sector
organisation, it is contributing to the nationally set climate change targets as well as
adhering to its other responsibilities in terms of both adaptation and sustainability.
• February 2023: Public Sector Duties Climate Change annual report 2021/22
https://mars.northlanarkshire.gov.uk/egenda/images/att99883.pdf
Asset management
The Corporate Asset Management Plan (CAMP) provides an overview of how the
council is managing its assets in alignment with the strategic direction of the
organisation to both deliver and sustain an asset base that will meet current and future
requirements. The CAMP is one of the tools used to manage the asset base and
guide activities (i.e. maintain, rationalise, invest, dis-invest); it links into the ongoing
review and development of the 5 year capital plan.
• September 2022: CAMP 2021-26
https://mars.northlanarkshire.gov.uk/egenda/images/att98661.pdf 
Updates on the asset rationalisation and development area of work - which includes
reviewing the use of assets on a regular basis to ensure their ongoing effectiveness -
were provided in: 
• October 2020:
https://mars.northlanarkshire.gov.uk/egenda/public/kab190.pl?cmte=PSC&meet=11 
• March 2020:
https://mars.northlanarkshire.gov.uk/egenda/public/kab190.pl?cmte=PSC&meet=7 
Latest version: September 2022
Review timeframe: Corporate Asset Management
Plan approved in September 2022 covers the period
from 2021 to 2026.
Assessment: The CAMP is on the Strategy Policy
Framework review programme to report on an
update in 2024/25, when the current plan reaches
the end of its current life.
RAG:
Chief Officer
(Assets and
Procurement)           
✓         
Communications Strategy
The council’s overarching Communications Strategy covers the whole organisation
and aims to ensure that communication activity closely aligns with the delivery of The
Plan for North Lanarkshire.  All major activity must support an ambition statement and
also align with the core narrative which supports the Live, Learn, Work, Invest, and
Visit brand strategy. 
• June 2019: https://mars.northlanarkshire.gov.uk/egenda/images/att90957.pdf 
The council has approved The Plan for North Lanarkshire and The Place, The Vision
and these are the council’s priorities and therefore the focus for communications
activity.  As such, the Annual Communications Plan details communications activities
for each year.
• June 2021: https://mars.northlanarkshire.gov.uk/egenda/images/att96259.pdf 
New platform developed for the council’s website went live in November 2020:
https://www.northlanarkshire.gov.uk/ 
The council’s website has a section dedicated for public consultation
https://www.northlanarkshire.gov.uk/your-community/working-
communities/consultations. This section is used - along with other methods as
appropriate - when draft strategies, policies, plans, or changes to service provision
require feedback from the public as part of the development process.
Latest version: June 2021
Review timeframe: Process in place to update the
communications plan annually.
Assessment: The council’s Communications
Strategy was approved in June 2019. As part of that
strategy, an annual communications plan was to be
published looking back at the previous year’s major
communications activity and setting out the major
activity for the next 12 months.  No plan was
published for 2020/21 due to the pandemic. The
plan for 2021/22 was approved in June 2021.  
Key to supporting the Programme of Work, an
update to the strategy and communications plan, as
well as an evaluation of activity for 2022/23, is
scheduled to be reported to committee in cycle 3 of
2023.
RAG: 
Chief Officer
(Strategic
Communication and
Engagement)   
✓ ✓ ✓ ✓   ✓         ✓  
Digital and IT Strategy
The Digital and IT Strategy is central to delivery of the council’s transformational /
service redesign programme as well as enabling many of the elements within the
council’s Programme of Work.  This details the programmes, projects, and policies
that will enable the council to recover, renew, and transform services by exploiting
emerging technology to the benefit of employees, service delivery, and ultimately the
people and communities of North Lanarkshire. It guides services to transition from the
current traditional IT estate to a new and agile digital service delivery. 
• September 2020: https://mars.northlanarkshire.gov.uk/egenda/images/att94512.pdf
• June 2019: https://mars.northlanarkshire.gov.uk/egenda/images/att90858.pdf 
The annual review in 2021/22 focussed on:
• Reiterating the overarching digital vision for a Digital North Lanarkshire (DigitalNL)
with Digital Communities, a Digital Economy, and a Digital Council. 
• Further strengthening the digital alignment with the council’s long-term vision as set
out in The Plan for North Lanarkshire, and the place-based investment programme
articulated through The Place The Vision, to reflect the scale and complexities of the
DigitalNL programme and the range of interdependencies across many Programme
of Work elements.
February 2022: https://mars.northlanarkshire.gov.uk/egenda/images/att97664.pdf
Latest version: February 2022
Review timeframe: Annual
Assessment: The Strategy was introduced in June
2019 and refreshed in September 2020 to reflect the
fast changing environment in which the council
operates, not least the implications and unexpected
opportunities arising from the coronavirus
pandemic.  A further review and significant refresh
was undertaken and approved at committee in
February 2022.  
An item within the Strategic Policy Framework, the
Digital and IT Strategy is next scheduled for review
in 2023/24, with a view to an updated strategy being
produced and reported in cycle 1 of 2024. 
RAG: 
Chief Officer
(Business and
Digital)    
✓ ✓  ✓  ✓  ✓ ✓    ✓    
Enterprise Architecture Governance Group (EAGG)
The EAGG ensures: 
Latest version: Recurring group.
Review timeframe: The group was formed in
Chief Officer
(Business and        ✓  ✓  ✓   ✓  ✓   ✓

Page 38

31 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
• Organisation wide governance for all digital solutions and services.
• That a cohesive, integrated, and data driven approach to enterprise wide
architecture is undertaken.
• A holistic full lifecycle view of solutions is considered.
• The council’s enterprise architecture principles are considered and addressed for
new proposals.
• The council’s enterprise architecture principle remain relevant. 
The EAGG aims to ensure a consistent, coherent, and complete council-wide
(enterprise) perspective to design to enable business operations to be transformed
and the associated benefits to be secured in a co-ordinated manner across the
organisation. 
The EAGG has the ability and responsibility to challenge operational business cases,
ensuring a holistic organisation wide approach to design is maintained and best value
is achieved. 
Meetings are held approximately every six weeks.
Minutes and meeting papers available.   
November 2019 to provide strategic governance
and oversight for all digital and IT related projects,
services, solutions, and operations within the
council to ensure such are fit for purpose and
comply with all relevant standards, specifications,
and principles.
Assessment: The EAGG reports to the DigitalNL
Delivery Board which holds meetings every second
month.  The intentions set out in the Digital and IT
Strategy are underpinned by the work of the EAGG. 
The Digital and IT Strategy (refreshed in February
2022) reflects the governance role of the EAGG.
A review of the terms of reference for the Group
was undertaken early in 2023 which identified
improvements to the supporting documentation
suite.  To further assess the effectiveness of the
Group a follow up self-evaluation is scheduled to be
undertaken during 2024/25. 
RAG:  
Digital)
Data Governance Board
The corporate Data Governance Board is responsible for developing good practice
and awareness raising to ensure that the council complies with its Data Protection
obligations.   
It is also responsible for developing the council’s overall maturity in how it collects,
analyses, and manages data and business intelligence to reduce the volume and
complexity of current reporting and achieve the shift to future state forecasting with
policies and service developments informed by data intelligence. 
The Data and Information Management Strategic Roadmap provides the framework
and development of the Business Intelligence Hub aims to deliver streamlined data
outputs. 
Meetings are held approximately every 8 weeks.
Minutes and meeting papers available.   
Latest version: Recurring group.
Review timeframe: Group reconfigured,
transitioning from a service perspective to a
functional perspective, at its meeting in December
2020.   
Assessment: Review of Board and terms of
reference for Data Governance Board and Data
Management Team was undertaken during
2021/22.  This incorporated a self-assessment
exercise where the areas for improvement were
reported to the Data Governance Board in
November 2021.
RAG: 
Chief Officer
(Business and
Digital)       
✓  ✓  ✓   ✓  ✓   ✓ 
Strategic data management and information governance 
• Data and information management strategic roadmap - August 2022:
https://mars.northlanarkshire.gov.uk/egenda/images/att98769.pdf 
• BI Hub update - February 2022:
https://mars.northlanarkshire.gov.uk/egenda/images/att97777.pdf
• Data and information management strategic roadmap - February 2021:
https://mars.northlanarkshire.gov.uk/egenda/images/att95605.pdf 
Latest version: August 2022.
Review timeframe: Annual. 
Assessment: Update on the implementation of the
Data and Information Management Roadmap and
BI Hub was submitted to the Policy and Strategy
Committee in August 2022. 
Next report is due to be submitted to committee in
cycle 3 of 2023.
RAG: 
Chief Officer
(Business and
Digital)                
✓    
Information Governance Framework
An Information Governance Policy Framework is in place, comprising policies in terms
of records and information management, data protection, information handling and
classification, information risk, information security and payment card data security to
ensure proper recording of information, appropriate access to that information
including by the public, and compliance with legislation. 
• June 2023: https://mars.northlanarkshire.gov.uk/egenda/images/att100735.pdf 
• June 2021: https://mars.northlanarkshire.gov.uk/egenda/images/att96160.pdf
Latest version: June 2023
Review timeframe: Next review due March 2025.
Assessment: Latest version of the Information
Governance Framework was approved at Policy
and Strategy Committee in June 2023.
RAG:   
Chief Officer
(Business and
Digital)    
✓ ✓  ✓  ✓  ✓ ✓    ✓    
Information Security Policy
An Information Security Policy, which includes cyber security, is in place; this aims to
protect the council’s information systems and physical assets including supporting
processes, networks, and equipment.  This is essential to ensure the council can
continue to operate and successfully deliver its functions, while finding the right
balance between the benefits and risks to the processing of information. 
• June 2023: https://mars.northlanarkshire.gov.uk/egenda/images/att100735.pdf 
• June 2021: https://mars.northlanarkshire.gov.uk/egenda/images/att96160.pdf
Latest version: June 2023
Review timeframe: Next review due March 2025.
Assessment: Latest version of the Information
Security Policy was approved at Policy and Strategy
Committee in June 2023.
RAG:   
Chief Officer
(Business and
Digital)    
✓ ✓  ✓  ✓  ✓ ✓    ✓    
Cyber security
Cyber security is the activity required to protect an organisation’s data, devices,
networks and software from unintended or unauthorised access, change or
destruction via the internet or other communications systems or technologies. 
Cyber incidents pose an increasing threat to public bodies’ management of their
information with hacking, ransomware, cyber-fraud and accidental losses all evident
across the public and private and sectors. 
Latest version: February 2023
Review timeframe: As required.
Assessment: A joint review and assessment was
undertaken in February 2023 (between Internal
Audit and Business and Digital) using a structured
format (using templates and guidance created by
the National Audit Office, National Cyber Security
Centre (NCSC), and the Scottish Government). 
Chief Officer
(Business and
Digital)    
✓ ✓  ✓  ✓  ✓ ✓    ✓

Page 39

32 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
• Cyber security assessment - February 2023:
https://mars.northlanarkshire.gov.uk/egenda/images/att100091.pdf 
This assessment - categorised as reasonable
assurance - determined the council has robust and
effective information governance arrangements,
duly recognises the risks associated with cyber
security threats, and operates practices
commensurate with the good practice
recommended by bodies such as the National Audit
Office.
RAG:   
Senior Information Risk Owner (SIRO) 
The SIRO role is fulfilled by a member of the CMT.  The SIRO has ownership of the 
council’s information risk policy, and acts at the strategic level as the advocate of
information assurance and risk. 
Good practice in information governance requires an annual information governance
and performance overview report to be presented to senior management and Elected
Members outlining the council’s information governance arrangements, performance,
and compliance against key expectations and requirements. 
• SIRO Information Governance Assurance and Performance Report 2021/22,
February 2023: https://mars.northlanarkshire.gov.uk/egenda/images/att99867.pdf 
• SIRO Information Governance Assurance and Performance Report 2019/20 and
2020/21, December 2021:
https://mars.northlanarkshire.gov.uk/egenda/images/att97501.pdf 
Latest version: February 2023
Review timeframe: Annual
Assessment: Following various council
restructures, SIRO responsibilities now rest with the
Chief Officer (Business and Digital).
A report was produced by the council’s SIRO and
presented to the CMT and Audit and Scrutiny Panel
in December 2021; this covered the years 2019/20
and 2020/21.  Reporting reverted to the
recommended annual frequency from financial year
2021/22 onwards, with a report submitted to the
Audit and Scrutiny Panel in February 2023. 
RAG: 
Chief Officer
(Business and
Digital)    
✓ ✓  ✓  ✓  ✓ ✓    ✓    
Data protection 
The Chief Officer (Legal and Democratic) is the council’s Data Protection Officer
(DPO) and the Chief Officer (Business and Digital) is the council’s Senior Information
Risk Owner (SIRO). 
• Data protection Policy was updated in line with the Information Governance Policy
Framework in June 2023:
https://mars.northlanarkshire.gov.uk/egenda/images/att100735.pdf 
• Data Protection Policy was updated in line with the Information Governance Policy
Framework in June 2021: 
https://mars.northlanarkshire.gov.uk/egenda/images/att96160.pdf 
• Data protection information published on InsideNL: Data protection.  This includes
Data Protection Impact Assessment (DPIA) guidance and template, General Data
Protection Regulation (GDPR) guidelines, data protection breach and incident
management protocol, privacy notice template, and data sharing agreements
register.
Latest version: June 2023
Review timeframe: Next review due March 2025.
Assessment: Policies and procedures in place and
communicated via InsideNL.  Latest version of the
Data Protection Policy approved at Policy and
Strategy Committee in June 2023
RAG: 
Chief Officer (Legal
and Democratic) /
Chief Officer
(Business and
Digital)    
✓ ✓  ✓  ✓  ✓ ✓    ✓    
Data protection annual report
The General Data Protection Regulation (GDPR) and the Data Protection Act 2018
(DPA) came into force in May 2018.  
An annual report updates on compliance with the regulations. 
• March 2023: https://mars.northlanarkshire.gov.uk/egenda/images/att100062.pdf 
• November 2021:
https://mars.northlanarkshire.gov.uk/egenda/images/att97307.pdf 
Latest version: March 2023
Review timeframe: Annual
Assessment: The annual data protection report
forms part of the Strategic Performance Framework
reporting schedule.  The latest report in March 2023
(by the council’s DPO) provided an update in
relation to data sharing, breaches, complaints, and
training. 
A report on the conclusion of a review of corporate
Data Protection arrangements undertaken to ensure
greater assurances can be provided in terms of
statutory compliance with data protection legislation
and information governance is scheduled to be
submitted to committee in cycle 4 of 2023. 
RAG: 
Chief Officer (Legal
and Democratic)     ✓ ✓  ✓  ✓  ✓ ✓    ✓    
Freedom of Information 
The Freedom of Information (Scotland) Act 2002 and the Environmental Information
(Scotland) Regulations 2004, both of which came into force in January 2005, provide
rights to the public to ask for and be provided recorded information held by public
authorities.
• The process is outlined on the council’s website; the website also contains a guide
to information available through the model publication scheme - November 2021:
https://www.northlanarkshire.gov.uk/your-council/managing-information/freedom-
information 
Latest version: November 2021
Review timeframe: Annual.
Assessment: Policies and procedures in place and
communicated through the council’s website.
RAG: 
Chief Officer (Legal
and Democratic) ✓  ✓              ✓  ✓ ✓ 
Freedom of Information annual report
November 2022: https://mars.northlanarkshire.gov.uk/egenda/images/att99389.pdf 
November 2021: https://mars.northlanarkshire.gov.uk/egenda/images/att97268.pdf 
Latest version: November 2022
Review timeframe: Annual
Assessment: The annual freedom of information
report forms part of the Strategic Performance
Framework reporting schedule.  The latest report in
Chief Officer (Legal
and Democratic) ✓  ✓              ✓  ✓ ✓

Page 40

33 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
November 2022 (by the Chief Officer (Legal and
Democratic)) provided an update on the number of
Freedom of Information and Environmental
Information requests as well as the number of
internal reviews and appeals to the Scottish
Information Commissioner processed.
RAG: 
Employment policies and associated guidance
The MyNL Policies A to Z site lists all of North Lanarkshire Council’s employment
policies and the associated guidance documents and forms. 
https://mynl.co.uk/a-to-z/ 
Contracts of employment and job descriptions are in place for all posts to give
employees a clear sense of purpose and direction. 
A recruitment process is in place which is applied consistently to ensure transparency
and fairness.   
In line with the Scheme of Administration, an Appointments Sub-Committee is in place
to deal with the recruitment and appointment of Chief and Depute Chief Officers with
full delegated powers to consider and agree the job outline, employee specification,
advertising proposals and interviewing procedures, agree the short list of candidates
to be interviewed, interview the shortlisted candidates, and make the appointment.
Latest version: Policies are all individually dated.
Review timeframe: Each policy is reviewed and
updated as required in line with organisational
and/or legislative changes.
Assessment: MyNL contains an A-Z list of all of the
council’s employment policies and the associated
guidance documents and forms.  These documents
are available to download.  A version control
process is in place to identify the date of the last
review and refresh for each document.
RAG: 
Chief Officer
(People Resources) ✓ ✓ ✓          ✓    ✓    
Local Government Benchmarking Framework (LGBF)
• National web portal available from the council’s website:
https://www.northlanarkshire.gov.uk/your-council/performance-of-the-
council/comparing-our-performance
• Improvement Service LGBF presentation of the latest results to the Audit and
Scrutiny Panel:
- March 2022: https://mars.northlanarkshire.gov.uk/egenda/images/att98107.pdf 
- September 2021:
https://mars.northlanarkshire.gov.uk/egenda/images/att96914.pdf
https://mars.northlanarkshire.gov.uk/egenda/images/att96951.pdf
- March 2021:  https://mars.northlanarkshire.gov.uk/egenda/images/att95913.pdf 
Latest version: National web portal last updated in
May 2023
Review timeframe: Annual publication of data by
the Improvement Service
Assessment: The national web portal and
Dashboard are available from the council’s website;
this provides access to all the benchmarking
indicators within the LGBF and allows for
comparisons with other local authorities, family
group averages, and national averages.  The Audit
and Scrutiny Panel received a presentation from the
Improvement Service in March 2021, September
2021, and March 2022, providing a high level
overview of the latest results within the North
Lanarkshire context.  From January 2023, the
council’s performance in the LGBF indicators has
been incorporated into each Chief Officers six
monthly Strategic Performance Framework report to
committee.
RAG:  
Chief Officer
(Business and
Digital)   
✓        ✓   ✓  ✓   ✓ 
Professional / specialised input to policy development and decision
making
Business partners in People Resources and Finance are aligned to specific services in
order to provided dedicated professional support. 
Solutions Relationship Managers in Business and Digital are aligned to services to
facilitate a smooth transition to integrated technology and digital solutions and
increase understanding of available solutions and levels of consumption. 
Specialised input is also incorporated into the council’s committee report process
which requires sections completed on the following impacts:
• Public Sector Equality Duty / Fairer Scotland Duty
• Financial 
• HR policy
• Legal
• Data protection
• Technology / digital
• Environmental / carbon - change in February 2022 reflects the agreement at the
Council meeting in June 2021, that the environmental impact was to be changed to
environmental / carbon impact.
• Communications
• Risk 
• Armed Forces Covenant Duty
• Children’s rights and wellbeing impact
The role, and need for, good governance is reiterated in the Guidance accompanying
the Report Template which requires to be used for all council reports. 
An e-learning module Writing Effective Committee Reports has been developed on
LearnNL.  The aim of this course is to establish a one-way approach to writing
Latest version: Ongoing resource
Review timeframe: As required.
Assessment: Structures and processes are in place
that provide services with access to officers for
professional / specialised input to policy
development and decision making and for report
writing purposes. 
The committee report template and guidance is
reviewed and updated regularly (either as a new
impact is identified and endorsed by the CMT, or
once a year as a matter of course).  An update in
February 2022 aimed to further improve the
contents of the impacts section in committee reports
and provide authors with subject matter experts
contact details for further information and guidance. 
A further update in December 2022 reflected the
new impact for the Armed Forces Covenant Duty
and the change in Head of Service designations to
Chief Officers.  
A subsequent update in June 2023 included the
introduction of an impact for children’s rights and
wellbeing.  The updated template and guidance is
available on InsideNL: Report Template.  
Updates to the report template and guidance is
issued to all employees via a NLC Announcement
e-mail following each update.
RAG:
All Chief Officers    ✓    ✓      ✓  ✓  ✓ ✓ ✓

Page 41

34 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
committee reports within the council.  The e-earning module can be accessed through
the following link: https://learnnl.learningpool.com/course/view.php?id=547 
A One Way of Reporting booklet has been developed by Corporate Communications -
this style guide provides guidance for those who have to put something in writing on
behalf of the council.  This can be anything from a letter, leaflet, strategy document, or
news release to a committee report.  This is available on InsideNL: One Way of
Reporting.pdf.
Fairer Scotland Duty
The Fairer Scotland Duty (FSD) came into effect in April 2018.  The duty places a
legal responsibility on particular public bodies in Scotland to actively consider how
they can reduce inequalities of outcome caused by socio-economic disadvantage
when making strategic decisions or at the policy development stage.  
August 2018: https://mars.northlanarkshire.gov.uk/egenda/images/att88434.pdf 
Interim guidance was published nationally at this time.  While awaiting further
guidance from the Scottish Government, the council was required to take steps to
ensure that the duty is taken forward through combining the needs of the FSD into the
equality impact assessment process, as recommended in the FSD interim guidance. 
In preparation for the new guidance being published, the council considered how its
own approach had delivered on the duty to reduce socio-economic disadvantage. The
findings from this review were presented to committee in September 2021:
https://mars.northlanarkshire.gov.uk/egenda/images/att96878.pdf 
Updated guidance was published by the Scottish Governance in October 2021.  The
guidance hasn’t changed substantially from what was published in 2018, as the duty
hasn’t changed, but it has been updated, enhanced, and informed by the experience
of delivering the duty over the last three years. The pandemic and its impacts are
reflected in the guidance, highlighting how important consideration of socio-economic
disadvantage is in decision making in order to tackle the unequal impact on those on
low incomes, with low wealth, in material deprivation, or living in deprived areas. 
Information in terms of the updated guidance was reported to committee in January
2022: https://mars.northlanarkshire.gov.uk/egenda/images/att97618.pdf 
Latest version: October 2021
Review timeframe: As this is nationally produced
guidance, the Scottish Government undertook a
consultation in May 2021 with a view to revising and
finalising the interim guidance.  Updated guidance
was subsequently published in October 2021.
Assessment: The guidance adopted by the council, 
incorporates the equality impact assessment
process and templates into the committee report
writing processes.  This guidance is on MyNL [
https://mynl.co.uk/knowledge-base/equality-impact-
assessments/  ].
Following publication of the updated national
guidance, a report was submitted to committee in
January 2022 highlighting the changes from the
previous guidance.
A report on the council’s progress against the Fairer
Scotland Duty is scheduled to be submitted to the
Wellbeing and Tackling Poverty Committee in cycle
3 of 2023.
RAG: 
Chief Officer
(People Resources)    ✓  ✓  ✓ ✓            
Equality Strategy
The council’s Equality Strategy sets out a clear commitment to deliver equality for
communities, service users, and employees through outcomes specifically developed
to support the council’s vision to make equality an embedded element of not only
mainstream service delivery but also the operation of the council. 
The Equality Strategy therefore underscores the council’s commitment to equality and
human rights and sets out an approach that ensures that equality is embedded within
everyday business through five key underpinning objectives for success. 
September 2019: https://mars.northlanarkshire.gov.uk/egenda/images/att91529.pdf
Latest version: August 2019
Review timeframe: Strategy approved in August
2019 covers the period from 2019 to 2024.
Assessment: The Equality Strategy is on the
Strategy Policy Framework review programme to
report on an update in 2024/25, when the current
strategy reaches the end of its current life.
RAG: 
Chief Officer
(People Resources)    ✓  ✓  ✓ ✓            
Equality Impact Assessments (EqIA)
The council ensures that equality impact assessments (EqIA) are undertaken to
ensure fairness and openness in the decisions taken.  This ensures a process is in
place to examine the council’s main functions and policies to see whether they have
the potential to affect people differently. 
Carrying out an EqIA on council policies, practices, decisions (including financial
decisions), functions, and strategies helps to identify any negative impact on particular
groups of people and therefore allows for action to be taken to remove it or lessen its
negative effects.  EqIAs also include assessments under the Fairer Scotland Duty. 
Equality Impact Assessments are published by each service on the council’s website:
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-impact-
assessments-eqias 
Latest version: Ongoing
Review timeframe: Registers are reviewed at
varying times within each service.
Assessment: The council has recently established
an Equalities Board and a key remit of this Board
will be to review and further strengthen the council’s
approach to Equality Impact Assessments.
RAG: 
Chief Officer
(People Resources)    ✓  ✓  ✓ ✓            
Public Sector Equality Duties
Every four years public bodies covered by the Public Sector Equality Duties (PSED)
are required to publish a number of reports and information to evidence how they are
meeting the needs of people whose characteristics are protected by the Equality Act
2010 - the PSED (General Duty).
June 2021: https://mars.northlanarkshire.gov.uk/egenda/images/att96170.pdf 
in April 2020, the council was successfully reaccredited as a Disability Confident
Leader after undergoing an external assessment conducted by Inverclyde Council.  In
August 2021 the council successfully participated in the pilot and achieved the Equally
Safe at Work Bronze Standard award.
• August 2021: https://mars.northlanarkshire.gov.uk/egenda/images/att96623.pdf 
• April 2020: https://mars.northlanarkshire.gov.uk/egenda/images/att93893.pdf 
A Race at Work Charter was approved at committee in October 2021.  This provides a
Latest version: May 2023
Review timeframe: Every four years
Assessment: The Public Sector Equality Duty
combined report in June 2021 covers a number of
different requirements including - Mainstreaming
Equalities, progress in achieving the council’s
equality outcomes, employment Information, and
the Equal Pay Policy Statement.  
The council’s most up to date Mainstreaming
Equality report was approved by the Wellbeing and
Tackling Poverty Committee in  May 2023, and will
be published in line with the Public Sector Equality
Duty.
RAG:
Chief Officer
(People Resources)    ✓  ✓  ✓ ✓

Page 42

35 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
framework to support employers to take practical steps to ensure that their workplaces
are identifying and tackling barriers that minority ethnic people face in in the
workplace. It requires employers to commit to seven calls to action to ensure that
ethnic minority employees are represented at all levels and that their organisation
reflects British society today.
• October 2021: https://mars.northlanarkshire.gov.uk/egenda/images/att97138.pdf 
A service review identified the need to be clearer about how the Equality Strategy is
being delivered and to set out the significant equalities programmes of work which link
to the ambitions and intentions within The Plan for North Lanarkshire, including
support for those who are most disadvantaged.   As such, a new delivery framework
for equalities was developed outlining more clearly the key areas of focus within
Equalities which will be supported by associated plan of activities and campaigns to
support the advancement of Equalities Strategy.  This was approved at committee in
February 2023:
• Delivery Framework for Equalities:
https://mars.northlanarkshire.gov.uk/egenda/images/att99820.pdf 
A Plan for Advancing Race Equality in the council’s Workforce, Communities, and
Schools was approved at committee in February 2023:
https://mars.northlanarkshire.gov.uk/egenda/images/att99818.pdf 
The Mainstreaming Equality report was updated and approved at committee in May
2023.  This details how the council, including the Education Authority and the
Licensing Board, is demonstrating that the general equality duty is integral to its work. 
This composite report also updated on progress being made to deliver against the
stated Equality Outcomes for 2021-25 as well as an up to date picture of the current
equalities profile of council employees, employment practices, and pay gap
information as required to be published by law every two years.
• Mainstreaming Equality report:
https://mars.northlanarkshire.gov.uk/egenda/images/att100517.pdf 
Corporate Risk Register
• Quarterly risk management update - May 2023:
https://mars.northlanarkshire.gov.uk/egenda/images/att100379.pdf 
• Corporate risk register  for 2022/23 - September 2022:
https://mars.northlanarkshire.gov.uk/egenda/images/att98468.pdf 
Latest version: September 2022
Review timeframe: Annual.
Assessment: Most recent version of the Corporate
Risk Register was considered by the Audit and
Scrutiny Panel in September 2022.  
The Corporate Risk Register is key in supporting the
council’s Programme of Work and, as such, is
subject to an annual review and update process. 
Risks within the Corporate Risk Register are on a
regular programme of review and updates on
specific risks are frequently reported to the Audit
and Scrutiny Panel.
As reported in the quarterly risk management
update to the Audit and Scrutiny Panel in May 2023,
all bar one of the risks on the Corporate Risk
Register are classified as live with completed risk
documentation.  The one risk classified as draft
where documentation is currently being finalised is
for the Target Operating Model (i.e. Ensuring
resources (workforce, digital and assets) and
service delivery are fully aligned to support the
successful implementation of the council’s future
operating model).
Quarterly risk management update reports are
scheduled to be presented to the Audit and Scrutiny
Panel each cycle of 2023/24.
RAG: 
Chief Officer (Audit
and Risk)       ✓  ✓ ✓ ✓   ✓ ✓ ✓  ✓   
Service risk registers 
Risk Champions and Facilitators are identified for each service.  These are noted on
InsideNL: Risk Management. 
• Quarterly risk management update - May 2023:
https://mars.northlanarkshire.gov.uk/egenda/images/att100379.pdf
Latest version: Ongoing
Review timeframe: Registers are reviewed at
varying times within each service.
Assessment: Service risk registers are required to
be a standing item on all service management team
meetings.
Work in 2023 has been undertaken to supplement
the corporate / strategic risk register information
included in the report to the Audit and Scrutiny
Panel with a summary of key service risks from
service risk registers to enable Elected Members to
have sight of those risks with the highest residual
risk scores.  This is scheduled to be included in the
Chief Officer (Audit
and Risk)       ✓  ✓ ✓ ✓   ✓ ✓ ✓  ✓

Page 43

36 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
report to the Audit and Scrutiny Panel in cycle 3 of
2023.
RAG: 
Project risk registers
As part of the corporate Project Management Framework (2022), all projects are
required to complete a Position Risk Assessment (PRA).  This is to estimate the level
of risk within a project, both at an initial stage and at any other time during the life
cycle of the project. 
The PRA template and guidance is on InsideNL: Project Management Framework 
Latest version: December 2022
Review timeframe: As required.
Assessment: The approach to risk management
when managing projects was reviewed when
updating the Project Management Framework in
2022. The Position Risk Assessment (PRA)
documentation and guidance was also reviewed
and updated at that time.
RAG: 
Chief Officer (Audit
and Risk)       ✓  ✓ ✓ ✓   ✓ ✓ ✓  ✓   
Complaints Handling Procedure
• Procedure and online portal available publicly on the council’s website:
https://www.northlanarkshire.gov.uk/your-council/complaints-and-feedback 
• Online portal for making complaints is also accessible from the website:
https://www.northlanarkshire.gov.uk/nlc-forms/complaint 
• Complaints performance on the council’s website - September 2022:
https://www.northlanarkshire.gov.uk/your-council/complaints-and-
feedback/complaints-performance 
Latest version: September 2022
Review timeframe: Annual
Assessment: Information on the local authority
complaints handling procedure is published on the
council’s website; this also contains links to the
online portal to allow for complaints to be made. 
The website also contains information on advocacy
services for those that need help to make a
complaint.
Annual reporting of the council’s performance in
complaints handling is noted on the Audit and
Scrutiny Panel annual scrutiny programme for a
report to be submitted in cycle 3 of 2023.
RAG: 
Chief Officer
(Business and
Digital)
✓   ✓  ✓   ✓      ✓  ✓    
Audit and Scrutiny Panel
The purpose of the Audit and Scrutiny Panel is to provide independent assurance to
the council and those charged with governance on the adequacy of the council's risk
management framework and internal control environment. 
It provides independent review of the council's governance, risk management,
performance, and control frameworks and oversees the financial reporting and annual
governance processes. 
Meetings are held every cycle.
Minutes and meeting papers are available in Mars.   
https://mars.northlanarkshire.gov.uk/egenda/public/kab71.pl?cmte=AUS  
Latest version: Recurring Panel meetings
Review timeframe: Review arrangements for the
Audit and Scrutiny Panel take place in line with the
Scheme of Administration.
Assessment: Scheme of Administration was
updated in October 2022:
https://mars.northlanarkshire.gov.uk/egenda/images
/att98939.pdf 
RAG: 
Chief Officer
(Business and
Digital) / Chief
Officer (Audit and
Risk)   
✓         ✓   ✓     ✓
Audit and inspection reports
The council is subject to ongoing inspection work undertaken by a range of scrutiny
bodies.  This includes the work the council carries out in partnership with other public
bodies.  This inspection work provides an independent assessment of North
Lanarkshire's performance.   
The latest inspection reports are available from the council’s website:
https://www.northlanarkshire.gov.uk/your-council/performance-of-the-council/best-
value/independent-assessments 
• Scottish Housing Regulator annual assurance statement 2021/22 - August 2022:
https://mars.northlanarkshire.gov.uk/egenda/images/att98392.pdf
• Scottish Housing Regulator annual landlord report 2021/22 - November 2022:
https://mars.northlanarkshire.gov.uk/egenda/images/att99127.pdf 
Latest version: Various
Review timeframe: These are set by the respective
external audit or inspection body.
Assessment: Audit and inspection reports are
reported to the relevant committee when received
by the council and uploaded to the website when
they are made publicly available by the relevant
body. 
RAG:
All Chief Officers    ✓         ✓   ✓     ✓
Best Value Assurance Report (BVAR)
• Update on recommendations, Audit Scotland Annual Audit Report (AAR) - October
2022: https://mars.northlanarkshire.gov.uk/egenda/images/att98619.pdf 
• Update on recommendations, Audit Scotland Annual Audit Report (AAR) -
December 2021: https://mars.northlanarkshire.gov.uk/egenda/images/att97492.pdf
• Update on recommendations, Audit Scotland interim Management Report - June
2021 https://mars.northlanarkshire.gov.uk/egenda/images/att96423.pdf 
• Update on recommendations - March 2020
https://mars.northlanarkshire.gov.uk/egenda/images/att93589.pdf 
• Update on recommendations - September 2019
https://mars.northlanarkshire.gov.uk/egenda/images/att91818.pdf
• Council meeting to formally present the BVAR findings - June 2019:
https://mars.northlanarkshire.gov.uk/egenda/images/att91268.pdf
• Council website: https://www.northlanarkshire.gov.uk/your-council/performance-of-
the-council/best-value/national-audit-results 
Latest version: October 2022
Review timeframe: Annual
Assessment: Published in May 2019, the BVAR
comprised eight recommendations for action by the
council.  An update was provided to the CMT and
Policy and Strategy Committee in September 2019
and March 2020.  The report in March 2020
consolidated the eight improvement actions within
the Programme of Work to strengthen a corporate
and integrated approach to improvement that
supports delivery of The Plan for North Lanarkshire. 
Any future updates in this respect are covered by
the External Auditors Annual Audit Report (AAR) -
the interim 2020/21 report was submitted to the
Audit and Scrutiny Panel in June 2021 and the final
2020/21 AAR in December 2021 - both provided an
Chief Executive /
Chief Officer
(Business and
Digital)
✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓

Page 44

37 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
update in terms of the eight BVAR
recommendations (four of which were confirmed by
Audit Scotland as complete).  
The AAR in October 2022 confirmed a further two
more recommendations were complete.
RAG: 
Internal Audit 
• Internal audit charter - September 2021:
https://mars.northlanarkshire.gov.uk/egenda/images/att96738.pdf
• Standing item on the agenda for the  Audit and Scrutiny Panel
https://mars.northlanarkshire.gov.uk/egenda/public/kab71.pl?cmte=AUS 
• Internal Audit annual plan 2022/23 - September 2022:
https://mars.northlanarkshire.gov.uk/egenda/images/att98467.pdf 
• Internal Audit annual plan 2021/22 - June 2021
https://mars.northlanarkshire.gov.uk/egenda/images/att96320.pdf 
• Internal Audit annual plan 2020/21 - September 2020:
https://mars.northlanarkshire.gov.uk/egenda/images/att94145.pdf 
• Internal Audit annual report 2021/22 (and annual opinion) - September 2022:
https://mars.northlanarkshire.gov.uk/egenda/images/att98464.pdf 
• Internal Audit annual report 2020/21 (and annual opinion) - June 2021:
https://mars.northlanarkshire.gov.uk/egenda/images/att96327.pdf
• Internal Audit annual report 2019/20 (and annual opinion) - September 2020
https://mars.northlanarkshire.gov.uk/egenda/images/att94146.pdf 
Latest version: Recurring function
Review timeframe: Annual
Assessment: The annual Internal Audit report
provides an update on compliance with corporate
governance and is a key item of evidence for the
Annual Governance Statement.
Various audit outputs are a standing item on the 
Audit and Scrutiny Panel agenda during the year.
Reports are scheduled to be submitted to the Audit
and Scrutiny Panel each cycle to provide a range of
independent assurance outputs, in line with the
approved Internal Audit Strategy and Annual Plan,
focused on cyclical coverage of core corporate
governance processes, key strategic priorities and
programmes of work, key corporate risks, and key
financial systems.  
An item within the Strategic Policy Framework, the
Internal Audit Strategy is scheduled to be updated
and reported to committee in cycle 4 of 2023.
RAG: 
Chief Officer (Audit
and Risk)    ✓            ✓     ✓
Corporate governance audits
• Audit on corporate governance principles C and D - May 2023:
https://mars.northlanarkshire.gov.uk/egenda/images/att100378.pdf 
• Audit on corporate governance principles A and B - March 2022:
https://mars.northlanarkshire.gov.uk/egenda/images/att96559.pdf
• Audit on corporate governance principles E, F, and G - March 2021:
https://mars.northlanarkshire.gov.uk/egenda/images/att95449.pdf 
• Audit on corporate governance principles C and D - September 2020:
https://mars.northlanarkshire.gov.uk/egenda/images/att94112.pdf 
• Audit on corporate governance, principles A and B - March 2019:
https://mars.northlanarkshire.gov.uk/egenda/images/att89965.pdf 
• Internal Audit annual report 2021/22 (and annual opinion) - September 2022:
https://mars.northlanarkshire.gov.uk/egenda/images/att98464.pdf 
• Internal Audit annual report 2020/21 (and annual opinion) - June 2021:
https://mars.northlanarkshire.gov.uk/egenda/images/att96327.pdf
• Internal Audit annual report 2019/20 (and annual opinion) - September 2020
https://mars.northlanarkshire.gov.uk/egenda/images/att94146.pdf 
Latest version: May 2023
Review timeframe: Annual
Assessment: The Chief Officer (Audit and Risk)
Internal Audit annual reports for 2019/20, 2020/21,
2021/22 and 2022/23 states that the results from the
detailed internal audit work examining the council’s
corporate governance arrangements suggest that
compliance with the requirements of the corporate
governance framework adopted by the council
continues to be positive with no significant
weaknesses or areas of concern highlighted.
An Internal Audit is undertaken on an annual basis
that focuses on specific principles of corporate
governance.  Findings and areas for improvement in
this respect are reported to the Audit and Scrutiny
Panel.
RAG: 
Chief Officer (Audit
and Risk) ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
External auditor’s annual audit report (AAR)
The Accounts Commission have appointed Audit Scotland as the council’s appointed
external auditor.  Expected outputs to be produced by the council’s external auditors
are outlined each year in their annual planning document.  The external auditor is
required to annually prepare a report for Elected Members and the Controller of Audit
summarising the audit work done and presenting the main findings arising from the
audit.  
The external auditor’s report presents key matters arising from each of the main areas
of work undertaken by the external auditor, including the audit of the financial
statements and issues relating to the council’s financial management, financial
sustainability, governance and best value arrangements.
• Final for 2021/22 published by Audit Scotland December 2022; links to the council
and IJB AAR are on the council’s website: https://www.northlanarkshire.gov.uk/your-
council/performance-of-the-council/best-value/independent-audits  
• Draft for 2021/22 at Audit and Scrutiny Panel - October 2022
https://mars.northlanarkshire.gov.uk/egenda/images/att98619.pdf 
• Draft for 2020/21 at Audit and Scrutiny Panel - December 2021:
https://mars.northlanarkshire.gov.uk/egenda/images/att97492.pdf
Latest version: October 2022
Review timeframe: Annual
Assessment: Draft Annual Audit Report (AAR) for
the council was considered by the Audit and
Scrutiny Panel in October 2022 with the final version
for the council published on the Audit Scotland
website in December 2022, and the IJB in March
2023.
RAG: 
Chief Officer
(Business and
Digital) / Chief
Officer (Finance) /
Chief Officer (Audit
and Risk)   
✓            ✓  ✓   ✓
ALEOs’ governance and risk management oversight and assurance 
The council’s five arm’s length external organisations (ALEOs) complete an annual
Certificate of Assurance and update the accompanying Checklist to support the
preparation of the council’s statements on corporate governance and internal financial
control. 
Latest version: February 2023
Review timeframe: Six monthly.
Assessment: Regular reports are submitted to the
Audit and Scrutiny Panel on arrangements to
ensure the council maintains adequate oversight of
service delivery and governance while
Chief Officer
(Business and
Digital)   
✓          ✓  ✓  ✓ ✓  ✓

Page 45

38 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
A regular reporting process is in place to provide the Audit and Scrutiny Panel with
oversight and assurance of governance, financial governance, and risk management
arrangements within each ALEO. 
• Latest - February 2023:
https://mars.northlanarkshire.gov.uk/egenda/images/att99770.pdf 
demonstrating where arm’s length external
organisations (ALEOs) are supporting delivery of
The Plan for North Lanarkshire.  
Latest oversight and assurance report submitted to
the Audit and Scrutiny Panel in February 2023.  
Six monthly reports are scheduled to be submitted
in cycle 3 of 2023 and cycle 1 of 2024.
RAG:  
Community Planning Partnership - Strategic Leadership Board
Information on the council’s website: https://www.northlanarkshire.gov.uk/your-
community/working-communities/your-area/community-planning 
Meetings are held approximately every 10-12 weeks.
Minutes and meeting papers available. 
• Annual report 2021/22, February 2023:
https://mars.northlanarkshire.gov.uk/egenda/images/att99827.pdf 
• Annual report, September 2021:
https://mars.northlanarkshire.gov.uk/egenda/images/att96876.pdf 
Latest version: Recurring group
Review timeframe: As required.
Assessment: Annual report approved at
Communities Committee in February 2023 provides
an update on activity to strengthen governance
arrangements within the North Lanarkshire
Community Planning Partnership Board  to
demonstrate where partnership working is making a
significant contribution to improving local outcomes
and ensuring compliance with statutory
requirements.
New corporate framework - Framework for
Demonstrating Improved Outcomes for
Communities - was formally approved by the
Strategic Leadership Board in June 2022.  This sets
out the performance arrangements in line with the
partnership’s programme of work, strategies,
policies, and plans, and strategic and local delivery
requirements and includes a reporting timetable.
RAG: 
Chief Officer
(Business and
Digital)    
✓ ✓ ✓ ✓ ✓ ✓  ✓         
Community Boards
• Community Boards and partnership communication strategy - March 2023: 
https://mars.northlanarkshire.gov.uk/egenda/images/att100487.pdf 
• Community Boards - progress update - August 2021:
https://mars.northlanarkshire.gov.uk/egenda/images/att96642.pdf
• Establishment of Community Boards - March 2020:
https://mars.northlanarkshire.gov.uk/egenda/images/att93588.pdf
• Community Matters - a framework for working with communities - August 2019:
https://mars.northlanarkshire.gov.uk/egenda/images/att91527.pdf 
Community Board information and dates of meetings on the council’s website - last
updated April 2023: https://www.northlanarkshire.gov.uk/your-community/working-
communities/your-area/community-boards 
Local Outcome Improvement Plans: https://www.northlanarkshire.gov.uk/your-
community/working-communities/your-area/local-outcome-improvement-plans-loips
Latest version: March 2023
Review timeframe: Meetings are ongoing.
Assessment: Boards are now established and a
schedule of meetings is in place.
Local Outcome Improvement Plans are in place for
each of the 9 Community Board areas.
A report providing an update on the work of the
Community Boards and the partnership
communication strategy is submitted to the
Communities Committee each cycle.
A review of corporate governance by Internal Audit
in 2021 recommended that, after allowing a
sufficient period of time for the model and individual
Boards to become established, a formal review (or
self-assessment) of the effectiveness of the
Community Boards should be undertaken.  This
work was combined with a self-evaluation of the
Strategic Leadership Board and an update provided
to the Audit and Scrutiny Panel in May 2023
[https://mars.northlanarkshire.gov.uk/egenda/image
s/att100378.pdf ] with an expected completion date
of September 2023.
RAG: 
Chief Officer
(Strategic
Communication and
Engagement) 
✓ ✓ ✓   ✓ ✓  ✓         
Boards and working groups
A range of programme / project Boards and working groups, aligned to the delivery of
specific Programme of Work items, are in operation, e.g. Strategic Capital Delivery
Group, DigitalNL, Hub Delivery Programme Board, and Data Governance. 
Meetings frequency differs for each Board, but generally meetings are held every 6-8
weeks.  Minutes and meeting papers available
Latest version: Recurring groups.
Review timeframe: Annual
Assessment: Membership and terms of reference
reviewed and updated as required.
A review of the council’s Boards and working groups
is currently underway during 2023/24 in line with the
work to develop delivery plans for the new
Programme of Work to 2028.
RAG: 
Chief Officers    ✓ ✓    ✓ ✓  ✓ ✓ ✓  ✓     
Serious Organised Crime / Counter Terrorism (SOC / CT) working
group
Serious organised crime and the threat of terrorist attacks continue to present
significant challenges to the council in it seeking to protect Elected Members,
employees, physical assets, public funds, and the information it holds from the risks of
infiltration and attack.
Latest version: Recurring group.
Review timeframe: The Chief Officer (Legal and
Democratic) is the Single Point of Contact (SPOC)
for the council’s working group as well as the
Lanarkshire multi-agency group. 
Assessment: A process is established through the
Chief Officer (Legal
and Democratic) ✓ ✓ ✓ ✓            ✓

Page 46

39 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3 
The council's physical and cyber security is a priority so as to ensure that it is not
exposed to any incident which gives rise to loss of life or injury, financial loss, or
reputational damage. 
Meetings are held quarterly.
Minutes and meeting papers available.   
SPOC to ensure ongoing review of all controls
either in place or assessed as being necessary. 
This is particularly important given the ever
changing and developing environment in which
these risks operate.  A specific review on the
council’s activities and measures to safeguard
against serious organised crime and terrorism
attacks was undertaken during 2022 and the
outcome was reported to the Policy and Strategy
Committee in September 2022  [
https://mars.northlanarkshire.gov.uk/egenda/public/k
ab190.pl?cmte=PSC&meet=21 ].  This work
continues to be undertaken throughout each year
and will be reported on an annual basis, with the
next report scheduled to be submitted to the Policy
and Strategy Committee in September 2023.
RAG: 
Corporate Resilience Plan
Dedicated section on InsideNL for business continuity and disaster recovery: 
• Corporate Resilience Plan - June 2021, this is available on InsideNL: Corporate
Resilience Plan.pdf
• Committee update - November 2022:
https://mars.northlanarkshire.gov.uk/egenda/images/att99191.pdf 
• Committee update - November 2021:
https://mars.northlanarkshire.gov.uk/egenda/images/att97157.pdf 
Latest version: June 2021
Review timeframe: As required.
Assessment: An annual update in respect of the
Corporate Resilience Plan was reported to
committee in November 2022.
RAG: 
Chief Officer
(Community
Operations) 
✓     ✓ ✓      ✓     
Corporate Resilience Group
Meetings are held approximately every 8 weeks.
Minutes and meeting papers available.   
Latest version: Recurring group
Review timeframe: Corporate Resilience Group in
operation; chaired by Chief Officer (Community
Operations).
Assessment: Effectiveness of the group is
reviewed in line with the council’s Corporate
Resilience Plan.  
RAG: 
Chief Officer
(Community
Operations)   
✓     ✓ ✓      ✓     
Corporate Business Continuity Plan / service Business Continuity
Plans
In line with legislation, businesses are required to have continuity planning measures
in place in order to survive and continue to thrive whilst working towards keeping the
incident as minimal as possible. In accordance with the Act, the council has a duty to
make relevant provisions and this forms an important part of the council’s resilience
development functions.   
• Corporate Business Continuity Plan on InsideNL - October 2021: Business
Continuity Documentation
• Annual assurance return / business continuity guidance notes are available on
InsideNL: Business Continuity Documentation 
Latest version: October 2021
Review timeframe: Annual
Assessment: It is the responsibility of each service
within the council to detail their specific business
continuity arrangements which would be enacted,
as appropriate, to mitigate the impact of an
emergency.  Chief Officers are required to review
and update their Business Continuity Plans
annually.  Chief Officers are also required to
complete a business continuity annual assurance
return.  
An Internal Audit was undertaken on Business
Continuity Planning in September 2022 [
https://mars.northlanarkshire.gov.uk/egenda/images
/att98345.pdf ].  This identified recommendations for
action which included improvements to the current
framework for documenting individual services’
Business Continuity / Disaster Recovery
arrangements to enhance the quality and
completeness of the corresponding plans, a more
robust and formalised review process for corporate
and individual services’ business continuity and
disaster recovery arrangements, and consistently
undertaking formal testing of business continuity
and/or disaster recovery arrangements.  These
improvement are expected to be fully implemented
by September 2023. 
RAG: 
Chief Officer
(Community
Operations)   
✓     ✓ ✓      ✓     
Power Resilience Strategy
Black Start event is the name for the recovery process following a complete (or partial)
shutdown of the Great Britain electricity system (National Electricity Transmissions
Failure) where the planning assumption is that full power restoration could take up to
seven days.  The planning arrangements for such a recovery process are described
Latest version: February 2023
Review timeframe: Review scheduled for
December 2023.
Assessment:  The aim of the Power Resilience
Strategy is to provide a framework for, and to
enhance, the council’s power resilience
Chief Officer
(Community
Operations) 
✓     ✓ ✓      ✓

Page 47

40 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
under the term Power Resilience. Within the last United Kingdom Government
National Risk Assessment, Black Start is rated as a medium likelihood with significant
impacts. 
Although the council has well documented and comprehensive business continuity
planning measures in place, all of these are based on the assumption that there will
be a national power supply available. As a consequence, the Scottish Government
requested that in addition to normal business continuity arrangements all public bodies
should also have a stand-alone Power Resilience Strategy which would be enacted in
the event of any failure of the national grid system. 
A Power Resilience Strategy was developed for the council and approved at
committee in February 2023:
https://mars.northlanarkshire.gov.uk/egenda/images/att99880.pdf
arrangements. 
RAG:
Council’s response to COVID
• Self-evaluation exercise - October 2020:
https://mars.northlanarkshire.gov.uk/egenda/images/att94694.pdf
• Internal audit - February 2021
https://mars.northlanarkshire.gov.uk/egenda/images/att95449.pdf 
Latest version: October 2020
Review timeframe: N/A
Assessment: A desktop review of the council’s
response to the COVID-19 pandemic was
undertaken in September 2020.  This review was
structured around a set of criteria developed
independently by the Improvement Service; it
comprised 20 assessment statements across four
sections - the council’s response to COVID19,
governance of the council during COVID-19,
support for staff during COVID-19, and new ways of
working.  This exercise also captured lessons
learned from the pandemic to support the council
through the recovery and renewal planning
processes, and to move to a platform of stability
from which available resources were able to be
redirected to fulfil the ambition set out in The Plan
for North Lanarkshire. 
An Internal Audit was subsequently carried out to
provide independent assurance of the adequacy
and effectiveness of the council’s resilience
arrangements and its response to the pandemic. 
Based on the results of the work, this audit was
categorised as offering substantial assurance.
RAG: 
Chief Executive    ✓   ✓ ✓  ✓     ✓      
Leadership and Operating Model
The Leadership and Operating Model aims to ensure a unified approach to maintain
effective management, operation, and governance structures within each Hub.  The
model aims to ensure that Town and Community Hubs operate as a single entity and
support a much wider integrated community offer - with communities having more
direct access to the services they need and staff closer to the communities they work
in.  This unified approach puts communities at the heart of the council’s model and
seeks to ensure everyone is given equality of opportunity and individuals are
supported, encouraged, and cared for at each key stage of their life. 
Latest version: March 2023
Review timeframe: Annual
Assessment: A three phased approach to the
model over a 10 year period was initially approved
in December 2021.  A report submitted to the Policy
and Strategy Committee in March 2023 outlined
what had been delivered in phase one and set out a
2-year plan for phase two as an integrated provision
that depends on strategic alignment between
projects and programmes delivering against The
Plan for North Lanarkshire.  At this time approval
was granted on the 2-year plan in order to move
towards the longer term operating model.  
RAG: 
Chief Officer
(Education)    ✓   ✓ ✓  ✓     ✓      
North Lanarkshire’s Economic Recovery Plan
This plan recognised that the pandemic has had a profound impact not just on the
nation’s health and wellbeing, but also on global, national, and local economies. It is
likely that the economic effects of the pandemic will be felt for many years to come.
While NLC is unable to directly influence some of the macro-economic factors that
impact on the local economy, the council and partners can still play an important role
in supporting local economic recovery. 
• Update, February 2022:
https://mars.northlanarkshire.gov.uk/egenda/images/att97633.pdf 
• February 2021: https://mars.northlanarkshire.gov.uk/egenda/images/att95704.pdf 
Latest version: February 2022
Review timeframe: This plan covers the period
from 2020 to 2023.
Assessment: The Delivering Good Governance in
Local Government: Framework positions the
attainment of sustainable economic, societal, and
environmental outcomes as a key focus of
governance processes and structures.  As such, the
Economic Recovery Plan seeks to secure
sustainable improvements in terms of economic
outcomes and opportunities for all by helping to
mitigate some of the economic impact of the
pandemic.  An update on progress was reported to
committee in February 2022.  
RAG: 
Chief Officer (Place)    ✓   ✓ ✓  ✓     ✓

Page 48

41 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
NL Connect
NL Connect is an opportunity for residents to share their views, help inform council
priorities, and shape the future of North Lanarkshire.
https://www.northlanarkshire.gov.uk/your-community/working-communities/nl-connect 
Latest version: Live process
Review timeframe: As required
Assessment: Ongoing mechanism for local
engagement.
RAG: 
Chief Officer
(Business and
Digital)   
✓ ✓ ✓   ✓            
Tenant engagement and participation
The Housing (Scotland) Act 2001 introduced the first legal framework for tenant
participation in Scotland. Section 53 (1) of the 2001 Act sets out the statutory
requirement for social landlords to develop and publish a Tenant Participation Strategy
in consultation with tenants. 
The Housing (Scotland) Act 2010 places additional duties on social landlords to
involve both tenants and other customers in housing and related services with the
introduction of the Scottish Social Housing Charter (SSHC). 
The Tenant Participation Strategy 2020-25 (Involving Tenants - Improving Services)
replaces the previous strategy and is the main source of information regarding tenant
participation; it outlines opportunities to participate in the monitoring and development
of the housing service.  The aim of this strategy is to continue to develop and improve
how the council communicates with tenants and residents and ensure opportunities
are provided for participation and involvement that are accessible to all. 
• Tenant Participation Strategy on the council’s website: Involving Tenants -
Improving Services 
• Update on implementation - September 2021:
https://mars.northlanarkshire.gov.uk/egenda/images/att96710.pdf
• February 2020: https://mars.northlanarkshire.gov.uk/egenda/images/att93095.pdf
Latest version: Strategy for 2020-25 approved in
February 2020.
Review timeframe: Reviewed quarterly via the
Tenant Participation Steering Group with
representatives from the North Lanarkshire
Federation of Tenants and Residents (NLF).
Assessment: The report to committee in February
2020 saw the approval of the new 5 year strategy
(2020-25) and the corresponding action plan.  This
strategy is also available on the council’s website..  
RAG: 
Chief Officer
(Housing
Management) 
✓ ✓ ✓               
Members induction
A range of materials are available through various platforms. 
Report to committee in March 2022 updated on the work undertaken to develop
appropriate arrangements for the induction and training of Elected Members following
the May 2022 local government elections.   
This also outlined the induction programme for May and June 2022:
https://mars.northlanarkshire.gov.uk/egenda/images/att97964.pdf 
Latest version: Full induction programme in place
for new and returning Elected Members following
the local government elections in May 2022.  
Review timeframe: Programme is reviewed as a
matter of course in line with the local government
elections timetable.  New Members, following by-
elections, also take part in an induction process.
Assessment: Report to committee in March 2022
concluded on the review of the governance and
induction and training arrangements.
A full programme for the induction of Elected
Members commenced immediately following the
Council elections in early May and was timetabled
to run for approximately 6 weeks.
The take-up by Elected Members was low, and a
downward trend of attendance was experienced. 
The Chief Executive took the decision to terminate
the programme with the proviso that important
aspects and subjects would be incorporated into the
ongoing Elected Members training and development
programme.  The training and development
programme is up and running with a number of
sessions already completed and more planned
going forward; each session is dedicated to a
specific topic. This programme will continue for the
duration of the council term.
RAG:  
Chief Officer
(People Resources) 
/ Chief Officer
(Legal and
Democratic)
✓ ✓ ✓         ✓ ✓        
Elected Members training and development
LearnNL provides an online portal for all Elected Members training and development
needs, as well as an induction programme for new Elected Members.  
LearnNL https://learnnl.learningpool.com/login/index.php 
Latest version: Learning site for Elected Members
went live on LearnNL in June 2021.
Review timeframe: Programme on LearnNL is
reviewed for effectiveness on an ongoing basis.
Assessment: The LearnNL site comprises an
Elected Members development programme and
provides access to a range of information, materials,
e-learning, and sessions on live topics as well as
the offer of 1:1s with the Training and Development
team.
RAG:  
Chief Officer
(People Resources) 
/ Chief Officer
(Legal and
Democratic)
✓ ✓ ✓         ✓ ✓        
Employee Performance Review and Development (PRD)
Revised scheme introduced in 2017 following consultation with employees and trade
unions and completion of a successful pilot scheme.
Latest version: March 2017
Review timeframe: As required.
Assessment:  As per an Internal Audit Corporate
Governance report to the Audit and Scrutiny Panel
Chief Officer
(People Resources) ✓ ✓          ✓ ✓

Page 49

42 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
https://mars.northlanarkshire.gov.uk/egenda/images/att85835.pdf  in May 2023 [
https://mars.northlanarkshire.gov.uk/egenda/images
/att100378.pdf  ], the PRD process has been
reviewed and the Learn NL system functionality has
been enabled to allow staff to record their PRD
conversations.  Following an initial pilot of the new
system earlier in the year, a report was considered
by the BMT in May 2023 to agree the full roll out
and launch of the PRD process and supporting
system.  
Full promotion of the new approach will be
undertaken as part of learning at work week in June
2023, with further engagement and training
available to support wider adoption after the launch.
RAG: 
Employee training and development
LearnNL provides an online portal for all employee training and development needs,
as well as an induction programme for new staff.   
A calendar of activity in LearnNL supports a range of employee learning and
development opportunities and a blended approach.
https://learnnl.learningpool.com/login/index.php 
Latest version: LearnNL went live in June 2020
Review timeframe: Ongoing
Assessment: Review of learning assets and digital
learning infrastructure completed and LearnNL went
live in June 2020.  This digital learning platform
aims to improve the ability to reach and provide
enhanced learning provision to all employees.
Leadership and management development
provision was revitalised through the LearnNL
Leadership Academy which provides bespoke
development programmes for managers to gain
specific development for future leadership roles.  
The e-learning offer was refreshed in line with
individual and organisational needs and updated
mandatory e-learning modules were introduced (for
data protection essentials, information security
awareness, records and information management,
introduction to risk management, conflicts of
interest, prevent, introduction to first aid, and fire
safety).  The mandatory e-learning module in
respect of the employee code of conduct was
incorporated into LearnNL in April 2023.
RAG: 
Chief Officer
(People Resources) ✓ ✓          ✓ ✓        
Workwell NL
Available to all employees, this platform provides benefits and discounts, health and
well-being support, and learning and development opportunities.  This is available
through the following portal: https://workwellnl.co.uk/ 
Workforce mental health and wellbeing strategy - May 2021
https://mars.northlanarkshire.gov.uk/egenda/images/att96130.pdf 
Latest version: Ongoing resource for employees
Review timeframe: As required.
Assessment: Workforce mental health and
wellbeing strategy approved in May 2021 covers the
period from 2021 to 2022.  
The council’s Mental Health and Wellbeing Strategy
was updated and approved by CMT in October
2022 to incorporate service based mental health
and wellbeing groups.  A fuller updated on this work
is scheduled to be provided to the Wellbeing and
Tackling Poverty Committee in cycle 4 of 2023.
RAG:  
Chief Officer
(People Resources) ✓ ✓          ✓ ✓        
Employee engagement and wellbeing and Investors in People
Investors in People is the internationally recognised industry standard for people
management that sets out and measures the extent to which organisations are able to
drive high levels of performance and employee engagement.  The council’s employee
engagement plan is fully aligned to the Investors in People framework. The framework
is also used to benchmark council practices against those of other leading
organisations. 
• December 2021: https://mars.northlanarkshire.gov.uk/egenda/images/att97423.pdf 
• May 2021: https://mars.northlanarkshire.gov.uk/egenda/images/att96130.pdf 
• September 2020: https://mars.northlanarkshire.gov.uk/egenda/images/att94474.pdf
Latest version: December 2021
Review timeframe: As per Investors in People
accreditation timetable.
Assessment: Reports to committee in September
2020 and May 2021 provided an update in terms of
employee engagement and wellbeing, and Investors
in People accreditation.  Report to committee in
December 2021 confirmed that the council had met
the requirements of the Investors in People
Standard with accreditation awarded at silver level.
An interim Investors of People survey is being
carried out during May and June 2023, with results
scheduled to be reported to committee in
September 2023.
RAG: 
Chief Officer
(People Resources) ✓ ✓          ✓ ✓