North Lanarkshire Council
Report
Audit and Scrutiny Panel 
Does this report require to be approved? ☒ Yes   ☐ No
Ref KA/ASP/May23 Date 18/05/23 
Internal Audit Annual Plan 2023-24 
From:  Ken Adamson, Chief Officer (Audit and Risk)
E-mail: adamsonk@northlan.gov.uk Telephone 07939 280602 
Executive Summary
The purpose of this report is to present the proposed Internal Audit Plan 2023-24 to members of
the Audit and Scrutiny Panel for their consideration and approval.
Although senior management is consulted in the development of the plan, the Chief Officer (Audit
and Risk) is solely responsible for determining the content of Internal Audit’s plans.  The work
proposed for 2023-24 has been discussed with, and endorsed by CMT, but responsibility for the
approval of the plan lies solely with the Audit and Scrutiny Panel.
The report sets out the background and context within which the internal audit planning process is
undertaken and provides a high-level overview of how it is proposed Internal Audit resources will
be allocated in 2023-24.
The Plan follows a well-established planning methodology which is designed to ensure cyclical
internal audit coverage of key corporate risks, key corporate priorities and projects (as outlined in
the recently approved Programme of Work to 2028), key governance arrangements and key
financial systems.
Members are asked to consider whether they are content that this represents an appropriate
programme of work for Internal Audit to undertake in 2023-24 and/or whether there are any items
in the draft Plan that they do not consider appropriate for inclusion and/or whether there are any
additional items they would wish to suggest for possible inclusion. 
Recommendations
The Panel is invited to:
(1) note the approach adopted to produce the 2023-24 Internal Audit Annual Plan;
(2) consider the detailed list of proposed Internal Audit assignments for the 2023-24 Plan (at
Appendix 1); and
(3) subject to any changes agreed by the Chief Officer (Audit and Risk) arising from discussions
with the Panel during consideration of the proposed assignments at (b) above, approve the
proposed 2023-24 Internal Audit Annual Plan (at Appendix 1). 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements

Page 2

1. Background
1.1 The Audit and Scrutiny Panel is required annually to consider and approve the Internal
Audit Annual Plan for the coming financial year.
1.2 Responsibility for the production and execution of the audit plan and subsequent audit
activities rests with the Council’s Chief Officer (Audit and Risk) (who fulfills the role of the
‘Chief Audit Executive’ as defined by the Public Sector Internal Audit Standards).  Although
senior management is consulted in the development of the plan, in line with relevant
professional standards, the Chief Officer (Audit and Risk) is solely responsible for
determining the content of Internal Audit’s plans.
1.3 This report sets out the background and context within which the Internal Audit planning
process is undertaken and provides a high-level overview of how Internal Audit resources
will be allocated in 2023-24.
1.4 In line with best professional practice, the draft plan has been discussed with the Council’s
Corporate Management Team before it is presented to the Panel for consideration and
approval.  The main objectives of the Council’s Internal Audit service are outlined in the
Internal Audit Strategy which was approved by the Panel in June 2019.
1.5 Internal Audit activity is governed by policies, procedures, rules, and regulations
established by the Council including the Council’s Financial Regulations and Internal Audit
Charter which is approved by the Panel, the Council’s s95 officer and the Chief Executive. 
The Internal Audit service is expected to comply with the standards laid down by the Public
Sector Internal Audit Standards (PSIAS).
1.6 The planned work of the Internal Audit service is outlined in the Internal Audit Annual Plan,
which is submitted to, and approved by, the Panel annually.  Any proposed programme of
work must be appropriate and sufficient to support the preparation of an opinion by the
Chief Officer (Audit and Risk) on the overall soundness of the Council’s corporate
governance, risk management and internal control systems. 
2. Report
2.1 Internal Audit is an independent and objective assurance function whose work is designed
to evaluate and improve the effectiveness of the Council’s risk management, control and
governance processes.  The service aims to provide a high quality and customer-focused
internal audit service, which is responsive and flexible, consistent with best professional
practice, aims to focus on areas that matter, to use resources efficiently and effectively
and to be seen by stakeholders as adding value, providing valuable insights and making
a vibrant and relevant positive contribution to the Council’s activities.
The wider audit environment
2.2 The Council’s strategic-level plan (‘The Plan for North Lanarkshire’) and its associated
‘Programme of Work to 2028, most recently approved by the Policy and Strategy
Committee in March 2023, sets out the Council’s strategic-ambitions and those key
activities designed to deliver against them.  These ambitions and the associated
programmes and projects represent a bold and challenging approach to addressing the
issues facing the Council and the people and communities of North Lanarkshire.
2.3 The Council also continues to seek to achieve its ambitions against a backdrop of
significant financial pressures, increasing demands for many key services and ever-
changing expectations about how services will be delivered.  The Council also needs to
respond to the impacts on it and its communities of a range of Scottish and UK
Government policies.  There also continue to be significant changes in governance
structures and processes across the Council.  Finally, ongoing events including the cost-
of-living crisis, the performance of the UK and Scottish economies and the war in Ukraine
as well as posing immediate challenges to which the Council is responding, also create
considerable additional longer-term risks and uncertainties.

Page 3

2.4 Internal Audit has an unusual role within the Council.  While part of the organisation, it is
operationally independent which provides a core basis for its work and the ongoing
independence and objectivity which is an important element in ensuring that it can
effectively meet stakeholders’ needs and expectations.  It seeks to provide assurance and
an annual audit opinion on the adequacy and effectiveness of the Council’s risk
management, internal controls and governance arrangements, while helping to secure
wider improvements, ensuring best value and assisting the Council in delivering against
its corporate ambitions.
Planning considerations
2.5 Internal Audit will meet this objective by operating in accordance with the Public Sector
Internal Audit Standards (PSIAS) and the associated CIPFA Local Government
Application Note (LGAN) which will enable the section to fulfil the roles and responsibilities
given to it by the Council as laid out in the Internal Audit Charter.
2.6 Internal Audit will do this by undertaking a risk-based work programme focused on cyclical
coverage of the Council’s core corporate governance processes, key corporate risks,
significant programme of work activities and key financial systems.  In doing so, elected
members and senior management will be supported in undertaking their roles by Internal
Audit providing assurance on the management of key strategic risks and priorities which
could impact on the achievement of the Council’s objectives.
2.7 The Internal Audit Annual Plan for 2023-24 (at Appendix 1) has been prepared in
accordance with well-established planning methodology which includes consideration of
a wide range of factors including the relative scale, significance and complexity of systems,
previous experience of the control environment, proposed or known changes in the
environment within which the Council operates, the potential financial, operational and
reputational consequences of any significant failures in relevant internal controls and the
possible impact of any failures on the achievement of the Council’s objectives, priorities
and ambitions.  Consideration is also taken of the extent and quality of assurance available
from other sources with reliance placed upon alternative sources of assurance where it is
appropriate to do so (such as external regulators and selected high-quality relevant
internal sources).
2.8 The Council’s risk management arrangements continue to improve, and we have
incorporated management’s assessment of the risks facing the Council into our planning
processes but remain of the view that these arrangements are not yet sufficiently mature
to enable me to fully align our audit planning with them, although the extent of alignment
continues to increase each year.  Careful consideration has been given, however, in
preparing the plan to the key corporate risks identified by senior management and we
expect to align our planning more closely with the corporate risk management processes
each year as these risk management arrangements become more mature.
2.9 Internal Audit will continue to work closely with the Council’s external auditors to ensure
that all audit activities are properly coordinated to minimise any duplication of work and
that the Council’s external auditors are able to place reliance on our work, where they wish
to do so.
2.10 As part of planning considerations, I have considered the level of resources and the
experience and skills available to Internal Audit.  The section’s staffing complement for
2023-24 remains unchanged from the prior year and I remain satisfied that the resources
available are adequate for the function to carry out its role effectively.  This assessment is
based on the level of available resources enabling adequate coverage of core corporate
governance processes, key corporate risks, programme of work items and key financial
systems over a rolling three-year period.

Page 4

2.11 A formal review of staffing within the function has not been undertaken for some time and
the Panel may also wish to note that a full review of the staffing structure within Audit and
Risk is planned for Summer 2023, with a view to ensuring that the staffing structure
continues to be ‘fit for purpose’ and reflects current and likely future demands placed on
the Service by changes in the auditing landscape.
2.12 As previously outlined to the Panel, I continue to review the Section’s ability to deliver the
range of ICT audit work necessary and will bring forward to the Panel detailed proposals
if I consider additional specialist resources may be required to supplement the work of the
core team.
2.13 I am also content that the Chief Executive and Chief Officer (Finance) have previously
indicated that additional resource can be made available to Internal Audit in the event of
any significant unexpected demands (such as for example, the need to undertake any
major unplanned investigations).
2.14 If any concerns relating to resources arise during the year which might be seen as
impacting on this assessment, these will be discussed initially with the Convener and, if
necessary, highlighted at the next Panel meeting.
2.15 I can also confirm the continuing independence of the Internal Audit service and its ability
to act in accordance with best professional practice free from undue interference by
management and/or senior elected members.  I have no concerns over the role and/or
status of the function and I am satisfied that the Chief Officer (Audit and Risk) post has
sufficient status within the organisation, being a member of the Corporate Management
Team and reporting directly to the Chief Executive.
2.16 If any such matters arise during the year which might be seen as compromising Internal
Audit’s independence or ability to discharge its role, these will be discussed with the
Convener and if necessary, highlighted at the following Panel meeting.
2.17 The Panel are aware, I also have management responsibility for the Council’s risk
management team.  This creates a potential conflict of interest which could be seen as
compromising my independence when Internal Audit is reviewing the Council’s risk
management arrangements, but I have previously outlined to the Panel that I consider that
this risk can be effectively managed and appropriate arrangements to ensure the Panel
can have confidence in the independence and robustness of future Internal Audit reviews
of the risk management function were set out in the Internal Audit Charter approved by
the Panel in September 2021.
Reporting the audit
2.18 Internal Audit will report regularly on the results of its work in line with the reporting protocol
approved by the Panel in September 2021.  Each individual Internal Audit report will be
issued to the relevant Chief Officer and copied to the Chief Executive and Depute Chief
Executive.  Reports on the work of Internal Audit will also be presented regularly during
the year to the Council’s Business and Corporate Management Teams.
2.19 The Internal Audit service will continue to report progress against the plan during 2023-24
to the Audit and Scrutiny Panel.  In line with the Internal Audit reporting protocol agreed
by the Panel in September 2021 full copies of all substantive audit reports will normally be
made available to the Panel and progress reports will include the high-level reporting of
all audit outputs included in the approved plan together with more detailed consideration
of all significant matters arising from those reports that the Chief Officer (Audit and Risk)
considers necessary to bring to the attention of the Panel.
2.20 An annual report prepared by the Chief Officer (Audit and Risk) on the adequacy and
effectiveness of the Council’s internal controls will also be presented to the Panel and the
Chief Executive.  The opinion in relation to 2023-24 will be included in my Annual Report
for that year which will be presented to the Panel in June 2024.

Page 5

2.21 A performance management framework for Internal Audit was approved by the Panel in
March 2021.  This sets out what information will be recorded and presented, to whom and
with what frequency.  As part of this framework, and in response to improvement actions
agreed in response to our external review, this includes greater formality around seeking
stakeholder feedback on Internal Audit performance from both senior management and
elected members.
Main areas of the 2023-24 Annual Plan
2.22 The proposed programme of Internal Audit activity is detailed at Appendix 1.  There are
several major categories of work within the Annual Plan.  These include:
• Work on core governance matters including the Council’s wider corporate
governance, risk management and performance management arrangements.  In
2023-24 this will include work associated with on the Council’s compliance with
corporate governance principles, on the Council’s risk management arrangements
and work assessing the adequacy and robustness of reported performance data.
• Work examining a sample of key strategic/corporate risks, key programmes
of work and/or service risks as part of regular cyclical audit coverage.  In 2023-
24, this will include work on the Enterprise Project, the Council’s approach to asset
management, reviewing progress in respect of business continuity arrangements
and examining the Council’s approach to meeting the challenges of climate change
and net zero.
• Work examining the Council’s finances and key financial systems including,
as part of regular cyclical audit coverage, work on payroll, council tax, general
ledger and treasury management.
• A range of follow-up work to ensure that previously agreed management actions
in respect of both internal and external audit recommendations are being
implemented by management.  In addition to detailed follow-up work on specific
audit reviews, we will also provide quarterly updates in respect of management
implementation of actions agreed in response to ‘Red’ and ‘Amber’ audit
recommendations; and
2.23 We will also continue to contribute to a wide range of corporate working groups and
Project Boards and to provide internal audit services to the North Lanarkshire Health and
Social Care Integrated Joint Board.
2.24 In line with good practice, the plan will be reviewed on a regular basis and may be
adjusted where necessary in response to changes in the Council’s business, risks,
operations, programmes, systems and controls.  Any material changes and the rationale
for such changes will be reported to the Panel. 
3 Measures of success
3.1 Provision of independent assurance in accordance with Public Sector Internal Audit
Standards.
3.2 Satisfactory assessment of the work of Internal Audit by the Council’s appointed
auditors.
3.3 Positive assessment of the work of Internal Audit by key stakeholders including senior
management and members of the Audit and Scrutiny Panel.

Page 6

4. Supporting Documents
Appendix 1 Proposed Internal Audit Plan 2023-24
Appendix 2 Internal Audit coverage of current key corporate risks over the last 5 years
Appendix 3 Internal Audit coverage of key financial systems over the last 5 years
Appendix 4 Consideration of Internal Audit activity (previous and planned) against the
Programme of Work to 2028
Appendix 5 Internal Audit performance framework 
Ken Adamson
Chief Officer (Audit and Risk)

Page 7

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public Sector Equality Duty
and/or Fairer Scotland Duty?
Yes ☐ No ☒
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory considerations
(including employment law considerations), or new legislation)?
Yes ☐ No ☒
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data?  
Yes ☐ No ☒
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital transformation,
service redesign / business change processes, data management, or connectivity / broadband / Wi-
Fi?
Yes ☐ No ☒
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any environmental or
carbon matters?
Yes ☐ No ☒
5.8 Communications impact
Does the report contain any information that has an impact on the council’s communications
activities?
Yes ☐ No ☒
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
Internal Audit forms part of the control framework for the management of several corporate risks
relating to corporate governance issues and these are documented in the relevant corporate risk
‘deep dive’ documents which are subject to periodic review by relevant management.  Operational
risks for the Service itself are documented in the Service’s risk register and are regularly reviewed
by the Chief Officer (Audit and Risk) and the service management team.
5.10 Armed Forces Covenant Duty
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does it relate
to healthcare, housing, or education services for in-Service or ex-Service personnel, or their
families, or widow(er)s)?
Yes              ☐                      No            ☒

Page 8

Appendix 1 Proposed Internal Audit Plan 2023-2024 
Topic Days Rationale and proposed scope
Corporate governance
Risk management 30
Core corporate governance process.  Follow-up of work undertaken in 2021-22 to review the
adequacy and effectiveness of the Council's risk management arrangements with a particular focus
on risk management arrangements within Services.
Corporate governance 20
Core corporate governance process.  Work will review the adequacy and effectiveness of the
Council's corporate governance arrangements and how the Council assesses compliance with the
relevant Code.  The review will also follow-up previous recommendation and consider the ongoing
adequacy and effectiveness of the Council’s strategic governance and self-evaluation frameworks
including how management gains assurance on compliance and performance.
Performance management 70
Core corporate governance process.  Follow-up of work undertaken in 2021-22 to review the
adequacy and effectiveness of the Council's strategic performance framework.  A particular focus will
be on arrangements rolled-out in 2022-23 for monitoring and reporting on performance to key
stakeholders (including Service committees) and reviewing the accuracy and robustness of reported
performance data.
Key strategic / corporate risks 
Workforce planning 40
Carried forward from 2022-23, work will focus on providing assurance on the adequacy and
effectiveness of the Council’s approach to workforce planning including the extent to which plans
appear comprehensive and planned actions are being satisfactorily progressed.
Enterprise Project 30
Depending on the outcome of work currently underway, we would expect to provide assurance on
the adequacy and effectiveness of management processes and arrangements surrounding the
Enterprise Project.
Managing strategic change 30
Work will focus on providing assurance on the adequacy and effectiveness of the Council’s recently
revised governance arrangements including those being implemented to oversee delivery of the
Programme of Work to 2028.
Climate change 30
Key corporate risk.  Carried forward from 2022-23, work will focus on providing an assessment of the
adequacy and effectiveness of the Council’s arrangements.  This is expected to include reviewing
how well the Council is developing/progressing realistic plans against relevant local and national
commitments and statutory obligations.

Page 9

Appendix 1 Proposed Internal Audit Plan 2023-2024 (continued) 
Topic Days Rationale and proposed scope
Key strategic / corporate risks / programmes of work (continued)
ICT operational capability 40 Work will focus on the adequacy and robustness of ICT governance arrangements including how the
Service manages relevant key risks.
Follow-up: Business continuity
planning 30 Work will focus on reviewing the effectiveness and impacts of actions taken by management in
response to previous audit findings.
Future operating model 30
Carried forward from 2022-23, work will focus on providing assurance that the Council’s future
operating model is being managed and implemented in an efficient and effective manner.  This will
include consideration of any impacts on asset rationalisation and the implementation of hybrid
working arrangements.
Service / operational/ Programmes of work
Housing Asset Management Plan 40 Work will be focused on providing assurance that the Council has adequate and effective asset
management arrangements in respect of its own housing stock.
Clyde Valley Waste Partnership 20 Assurance work required every two years in line with Inter-Authority Operating Agreement.
City Deal 20 Assurance work required annually in line with Glasgow City Region assurance framework.
Housing Capital Programme 40
Work will be focused on providing assurance on the adequacy and effectiveness of the Council’s
arrangements for effective procurement, contract management and performance monitoring
arrangements in relation to the housing capital programme.
Social Work quality assurance
arrangements 40 Work will be designed to provide assurance on the adequacy and effectiveness of the Council’s
quality assurance arrangements in relation to the provision of social work and social care services.

Page 10

Appendix 1 Proposed Internal Audit Plan 2023-2024 (continued) 
Topic Days Rationale and proposed scope
Financial management and key financial systems
Payroll – selected controls 40 Work will focus on assessing the adequacy and effectiveness of arrangements designed to prevent
and detect errors and/or regularity issues associated with the Council’s payroll operations.
Regularity work - financial systems -
Payroll 40 Substantive testing of selected key controls associated with the authorisation, regularity and
processing of payroll transactions.
Regularity work - financial systems -
Creditors 30 Substantive testing on selected key controls associated with authorisation, regularity and processing
of creditor payments.
Council Tax 40 Work will focus on assessing the adequacy and effectiveness of key controls associated with the
billing and collection of Council Tax income.
Treasury Management 30
Work will focus on assessing the adequacy and effectiveness of key controls associated with the
operation of the Council’s treasury management function including compliance with the relevant
CIPFA Code.
General Ledger 30 Work will focus on assessing the adequacy and effectiveness of key controls associated with selected
activities associated with the operation of the Council’s general ledger.
Provision of IA services to third parties
Integrated Health and Social care -
North Lanarkshire JIB 30 Annual programme of work to be agreed with relevant senior management and NL JIB Performance,
Finance and Audit Sub-Committee.
Fraud and irregularity
Review of the Council's Anti-Fraud
arrangements 30
Work reviewing the current corporate anti-fraud policies and arrangements and implementing any
identified actions necessary to ensure that the Council’s arrangements are more fully consistent with
recognised good practice (this may include developing a Counter Fraud strategy and/or an annual
Counter Fraud Action Plan which more clearly sets out planned actions for managing the risk of fraud
and corruptions and any planned fraud prevention and/or pro-active detection work).
National Fraud Initiative 30 Work co-ordinating and progressing the Council’s involvement with the NFI.
Allowance for fraud and irregularity
investigations 70 Demand-led allowance to enable investigations to be undertaken as required.

Page 11

Appendix 1 Proposed Internal Audit Plan 2023-2024 (continued) 
Topic Days Rationale and proposed scope
Audit Committee and External Audit
Liaison with external audit 5
To ensure the external audit process can proceed efficiently and effectively.  Assisting external audit
to undertake their role including co-ordinating management responses to assist with the finalisation
of audit outputs.
Facilitating the work of the Audit and
Scrutiny Panel 30 To enable the Audit and Scrutiny Panel to fulfil its role.  Preparation of agendas and reports and
attendance at meetings.
Follow-up of IA and EA
recommendations 80 To enable the Audit and Scrutiny Panel to fulfil its role.  To monitor and report on whether
management has implemented actions agreed by senior management in response to audit reports.
Follow-up: Audit Scotland/Accounts
Commission national reports 10
To ensure national audit reports are given proper consideration by management and to enable the
Audit and Scrutiny Panel to fulfil its role in considering such reports and the Council’s responses. 
Focusing on how the Council is responding to key issues highlighted in national audit outputs.
Contribution to good governance
Provision of ad hoc advice on
systems development and control
issues
30 To reflect the provision of input into systems development and ongoing ad hoc advice to management
on specific control and risk issues.
Participation in a range of Corporate
Working Groups and Project Boards 50 To ensure that Internal Audit contributes, as appropriate, to corporate arrangements for the oversight
and/or development of any relevant control, risk and governance issues.
Other
PSIAS self-assessment and Quality
Assurance Programme 20
To ensure that the service provided is consistent with expectations.  Continuous improvement activity
to progress recommendations arising from the PSIAS EQAR and internal self-assessment.  To enable
necessary work to ensure on-going PSIAS compliance can be substantiated.
Community Councils 15 Facilitating the audit of community councils and liaising with external auditor on issues arising.
Contingency 60 To deal with additional unplanned work
Total 1180

Page 12

Appendix 2 Internal Audit coverage of current key corporate risks
Key Corporate Risk 2023-24 2022-23 2021-22 2020-21 2019-20 Comments (including date any relevant assignments reported
to the Audit & Scrutiny Panel)
1. Information
security and
information
governance
NO √ - √ -
No specific audit work planned in 2023-24.  Previous audit work
has provided sufficient recent assurance on this key risk.  Previous
reports: Cyber Security (February 2023) and Information
Governance and Security (February 2021)
2. Information
governance: data
migration (new)
NO - - - -
No specific audit work planned in 2023-24.  Specific risks arising
from time-bound actions/project to rationalise how the Council
holds its’ data.
3. Public protection  NO - - √ -
No specific audit work planned in 2023-24.  Previous audit work
has provided sufficient recent assurance on this key risk.  Follow-
up work will monitor implementation of agreed management
actions. Previous reports: Public Protection (September 2021) 
4. Managing
strategic change YES - - √ √
This remains a significant key risk and continues to merit high-level
review of relevant management arrangements on an annual basis
given the scale of Council’s ambitions and the challenging
environment in which it is operating.  Previous reports: Managing
Strategic Change (June 2021) and Managing Strategic Change
(February 2020).
5. Health & Safety NO - - √ -
No specific audit work planned in 2023-24.  Previous audit work
has provided sufficient recent assurance on this key risk.  Previous
reports: Health and Safety (May 2021) and Health and Safety
(Management of Covid risks) (November 2020).
6. Business
continuity
planning
YES - √ - -
Audit work planned in 2023-24 will review the effectiveness and
impacts of actions taken by management in response to previous
audit findings.  Previous reports: Business Continuity Planning
(July 2022).

Page 13

Appendix 2 Internal Audit coverage of current key corporate risks (continued) 
Key Corporate Risk 2023-24 2022-23 2021-22 2020-21 2019-20 Comments (including date any relevant assignments
reported to the Audit & Scrutiny Panel)
7. Financial
sustainability NO - - √ -
No specific audit work planned in 2023-24.  Previous audit work
has provided sufficient recent assurance on this key risk.  This
area is also being examined by external audit as part of their
2022-23 audit process.  Separate and specific work proposed on
individual financial systems is also shown below.  Previous
reports: Financial management (March 2021) and Financial
sustainability (November 2020).
8. Human
Resources YES - √ - -
Work on workforce planning included in 2023-24 (carried forward
from 2022-23).  Recent audit work has provided sufficient recent
assurance on other aspects of this key risk.  Follow-up work will
monitor implementation of any agreed management actions. 
Previous reports: Supporting attendance (August 2022).
9. Engagement and
consultation NO - - √ √
No specific audit work planned in 2023-24.  Previous audit work
has provided sufficient assurance on some aspects of this key
risk.  Follow-up work will monitor implementation of any agreed
management actions.  Previous reports: Community engagement
and empowerment (June 2020) and elements covered by work on
Corporate Governance Principle B Openness and stakeholder
engagement (February 2022).
10. Procurement
risks YES - √ √ -
No specific dedicated audit work planned in 2023-24 as previous
audit work has provided sufficient assurance on tendering and
contract award arrangements.  Procurement aspects will however
be included in planned work on the Housing Capital Programme. 
Previous reports: Contract management (May 2023),
Procurement (November 2021) and Housing Investment
Programme (June 2020).  Assurance also obtained via work on
Creditors (see below), work currently underway in relation to the
Housing Investment Programme and through work on the
Enterprise Contract (March 2021).

Page 14

Appendix 2 Internal Audit coverage of current key corporate risks (continued) 
Key Corporate Risk 2023-24 2022-23 2021-22 2020-21 2019-20 Comments (including date any relevant assignments
reported to the Audit & Scrutiny Panel)
11. Enterprise
Project YES - √ √ √
Although the nature of this project has been significantly revised,
it remains a high-profile key risk which warrants coverage, the
scope of audit work will be dependent on progress of the project. 
Previous reports: Enterprise Contract (May 2022), ESCP (March
2021) and ESCP (March 2020)
12. Climate change YES - - - √
Carried forward from 2022-23, work will be focusing on reviewing
how well the Council is progressing realistic plans against
relevant local and national commitments and statutory
obligations.  Previous reports: Carbon management (May 2020)
13. Serious
organised crime,
fraud and
corruption
YES - - √ √
Carried forward from 2022-23, work will review the adequacy and
effectiveness of the Council’s anti-fraud arrangements and policy. 
A high-level review will also be kept on the SOC issue, through
attendance at the relevant corporate working group and work
underway corporately to assess the Council’s arrangements
against recent Police Scotland guidance to LAs on this issue. 
Previous reports: Review of anti-fraud arrangements (May 2020)
and NFI 2022 and 2020 exercises.
14. Terrorism  NO - - - -
No specific audit work is proposed but a high-level watch will be
kept on the issue, through attendance at the relevant corporate
working group, and commentary included, as appropriate, in IA
progress reports and the IA Annual Report.  Previous reports:
None
15. Governance,
Leadership and
Decision-Making
NO √ - √ √
No specific audit work is proposed on this risk in 2023-24 but
planned work on corporate governance is expected to also cover
many aspects which relate to this issue.  Routine follow-up work
will monitor implementation of any previously agreed
management actions.  Previous reports: Corporate Governance
Principles C and D (May 2023), Corporate Governance (March
2021) Corporate Governance (March 2020) and Corporate
Governance Principles A and B (February 2022).

Page 15

Appendix 2 Internal Audit coverage of current key corporate risks (continued) 
Key Corporate Risk 2023-24 2022-23 2021-22 2020-21 2019-20 Comments (including date any relevant assignments
reported to the Audit & Governance/Scrutiny Panel)
16. ICT operational
capability YES - - - √
Audit work planned in 2023-24 will address ICT governance
arrangements including how the Service manages relevant key
risks.  Previous audit work has provided assurance on some
aspects of this key risk.  ICT operational capabilities and
governance arrangements are also addressed via work on
specific systems and by previous audit work on Digital NL. 
Previous reports: Digital NL (September 2021) and IT Network
controls (September 2019)
17. Resilience
planning NO - √ √ -
See Business Continuity Planning (at 5 above).  Previous
reports: Business Continuity Planning (July 2022) and Covid-19
response (February 2021).
18. Digital and IT
strategy NO - √ √ -
No specific audit work is proposed.  Recent Internal Audit work
in this area has focused on providing ongoing assurance in
relation to the implementation and governance of the approved
DigitalNL transformation programme and the ongoing
digitalisation of Council services and this focus will continue in
2022-23.  Previous reports: Digital NL (November 2021 and
October 2020) and Network controls (September 2019).
19. Tackling poverty NO √ √ - -
No specific audit work is proposed.  Routine follow-up work will
monitor implementation of any previously agreed management
actions.  Previous reports:  Cost of Living Crisis / Welfare
payments (May 2023) and Tackling Poverty (November 2021)
20. Implementation
of Economic
Regeneration
Development
Plan
NO - √ √ -
No specific audit work is proposed.  Recent audit work has
provided sufficient recent assurance on this key risk.  Follow-up
work will monitor implementation of any agreed management
actions.  Previous reports: ERDP (June 2021).

Page 16

Appendix 2 Internal Audit coverage of current key corporate risks (continued) 
Key Corporate Risk 2023-24 2022-23 2021-22 2020-21 2019-20 Comments (including date any relevant assignments
reported to the Audit & Governance/Scrutiny Panel)
21. Further
developments:
Impacts of
integration of
health and social
care
NO - - - -
No specific audit work is proposed for 2023-24 pending further
clarification of the detail and timing of the implementation of
proposed legislation to create a National Care Service.  Specific
audit work is undertaken on behalf of, and reported to, the IJB.  A
range of audits examining operational Social Work activities are
undertaken as part of the Council plan.  Recent reports:  Social
Work Quality Assurance arrangement (expected Autumn 2023),
Public protection (June 2021), Self-Directed Support (November
2020).
22. Supply chain
risks (New) NO - - - -
No specific audit work is proposed for 2023-24 but a watching
brief will be kept as to how this risk develops and how well the
Council is managing it.  Recent reports:  None, although aspects
will have been addressed through work on creditors and contract
management.
23. Educational
attainment (New) NO √ - - -
No specific audit work planned in 2023-24.  Previous audit work
has provided sufficient assurance on some aspects of this key
risk.  Recent reports:  Education quality assurance arrangements
(January 2023), additional aspects have also been addressed
through previous audit work on Pupil Equity Funding (PEF) and
Scottish Attainment Challenge Funding (SAC) (various).
24. Target operating
model (New) YES - - - -
Carried forward from prior year, specific audit work is proposed
for 2023-24 examining how the Council’s is developing and
managing planned activities under this heading.
25. Scottish Child
Abuse Inquiry
(New)
NO - - - -
No specific audit work planned in 2023-24.  Risk staff working
closely with relevant management to ensure risks associated with
the Council’s engagement with this Inquiry are understood and
are being managed appropriately.

Page 17

Appendix 3 Internal Audit coverage of key financial systems 
Key Financial
Systems 2023-2024 2022-23 2021-22 2020-21 2019-20 Comments (including date any relevant assignments reported to the
Audit & Governance/Scrutiny Panel)
1. General
ledger YES  - √ -
Previous audit work has provided positive assurance but planned cyclical
coverage will focus on key areas such as controls over journals, use of
suspense accounts and other risk areas.  Routine follow-up work will
monitor implementation of any agreed management actions.  Previous
report: General ledger (November 2020)
2. Payroll YES √ √ √ √
Recent audit work has indicated some concerns over the robustness of the
control environment, and this combined with the complexity and value of
transactions requires regular audit coverage.  Previous reports: Payroll –
Overtime and T&S (April 2023), ESC selected controls (March 2022 and
June 2021), Payroll – overtime (May 2020) and Payroll – selected key
controls (November 2019).
3. Creditors YES √ √ √ √
Recent audit work indicates that the control environment is generally
robust, but complexity and value of transactions requires regular audit
coverage.  Previous reports: Creditors (January 2023), Creditors (March
2022), Creditors selected key controls (February 2021, March 2020 and
May 2019).
4. Council
Tax YES - - √ -
Previous audit work has provided positive assurance but planned cyclical
coverage will focus on key aspects of the billing and collection of Council
Tax income.  Previous reports: Council Tax (November 2020).
5. Non-
domestic
rates
NO - √ - -
Previous audit work has provided positive assurance.  Routine follow-up
work will monitor implementation of any agreed management actions. 
Previous reports: Non-Domestic Rates (January 2022).
6. Housing
Rents NO - √ - -
Previous audit work has provided positive assurance.  Routine follow-up
work will monitor implementation of any agreed management actions. 
Previous reports: Housing Rents (October 2021 and November 2018).

Page 18

Appendix 3 Internal Audit coverage of key financial systems (continued) 
Key Financial
Systems 2023-24 2022-23 2021-22 2020-21 2019-20 Comments (including date any relevant assignments reported to
the Audit & Governance/Scrutiny Panel)
7. Treasury
management YES - - √ -
Previous audit work has provided positive assurance but planned
cyclical coverage will focus on compliance with expected controls and
relevant national guidance.  Previous reports: Treasury management
(December 2020)
8. Financial
management NO - - √ -
No work planned for 2023-24 as previous audit work and external
inspections have provided positive assurance on this key risk area. This
issue will also be examined by the Council’s external auditors in 2023
as part of their annual audit work.  Previous reports: Financial
management (February 2021) and Financial management (November
2020).
9. Housing
Benefit NO √ - - √
No work planned for 2023-24 as previous audit work has provided
positive assurance on this area and the control framework is relatively
stable and transaction volumes are progressively lower due to Universal
Credit.  Previous reports: Housing Benefit and Council Tax Reduction
(September 2022) and Housing Benefit (September 2019).
10. Cash/income
collection NO √ - - √
No work planned for 2023-24 as previous audit work has provided
positive assurance on this area.  Previous reports: Income and cash
collection - Cash offices (October 2022), Income and cash collection –
Lesiure sites (January 2023) and Cash collection offices (August 2019).
11. Debtors NO √ - - √
No work planned for 2023-24 as recent audit work has provided
assurance on this area.  Management responses to previous audit
findings will be tracked as part of routine follow-up work.  Previous
reports: Sundry Debt/Debt management (November 2022) and Debt
management (December 2019)

Page 19

Appendix 4 
Internal Audit coverage (recent and planned) of ‘Programme of Work to 2028’ strategic themes. 
1. Transforming Places and Invest in North Lanarkshire
Includes the following programmes, projects and activities:
• City Deal
• Economic Regeneration Delivery Plan activities
• Housing New Supply Programme
• Town Centre Visions
• Cumbernauld Town Centre
• Town and Community Hub Delivery
• Towers Reprovisioning
• Enterprise Project
• Open Space strategy
• Housing property repairs and maintenance activities
• Business and inward investment support activity
• Housing Asset Management Plan
• Active Travel Strategy 2021-31 
• Local Housing Strategy 2021-26
Recent audit coverage on activities relevant to this strategic theme has included work on ERDP (June
2021), City Deal ((May 2023 and required annually as part of GCR governance arrangements), New
Supply (March 2020), Town and Community Hub Programme (November 2021) and Enterprise Project
(June 2022).
Internal Audit proposed coverage in 2023-24 will include the following:
• City Deal • Housing capital programme
• Enterprise Project • Housing Asset Management Plan 
2. Sustainable Futures
Includes the following programmes, projects and activities:
• Climate Change/Climate Plan activities
• Local Heat and Energy Efficiency Strategy
• Vehicle replacement programme (decarbonisation of fleet)
• Refuse collection and recycling.
• Clyde Valley Waste Partnership
• School transport
• Corporate fleet maintenance
• Strathclyde Country Park - Green Growth Accelerator
• Eco Hub – Bellshill
• Solar Farms - Auchinlea/Dalmacoulter
Recent audit coverage on activities relevant to this strategic theme has included work on Carbon
Management (May 2020), Waste and Fleet staffing issues (May 2023), Clyde Valley Waste Partnership
(April 2022 and required bi-annually as part of contractual governance arrangements).
Internal Audit proposed coverage in 2023-24 will include the following:
• Climate change • Clyde Valley Waste Partnership

Page 20

Appendix 4 (continued) 
Internal Audit coverage (recent and planned) of ‘Programme of Work to 2028’ strategic themes. 
3. Resilient People
Includes the following programmes, projects and activities:
• Home Support
• Tackling Poverty
• 1140 Hours Early Learning 
• ASN activities
• SAC and PEF
• Schools - Curriculum delivery
• National Care Service
• Public Protection
• Children’s Services
• Community Learning and Development activities
• Range of services and activities delivered via Social Work, Third Sector and through IJB Strategic
Commissioning
Recent audit coverage on activities relevant to this strategic theme has included work on Tackling Poverty
(November 2021), Public Protection (September 2021), SAC and PEF (various dates, most recently
August 2021), Education Quality Assurance arrangements (January 2023) and Welfare and Poverty
related payment (May 2023)
Internal Audit proposed coverage in 2023-24 will include the following:
• Social Work Quality Assurance 
4. Brighter Futures
Includes the following programmes, projects and activities:
• Workforce for the Future
• Skills development/Sector Academies
• Employability Services
No recent audit coverage has been undertaken on activities relevant to this strategic theme.
• Workforce planning 
5. Digital North Lanarkshire
Includes the following programmes, projects and activities:
• Digital NL
• Smart NL
• ICT support and systems management
• BI Hub
• HSMS replacement
• Corporate and Service technology projects
• IT and Information Security
Recent audit coverage on activities relevant to this strategic theme has included work on Cyber Security
(January 2023), Information Governance and Security (January 2021) and Digital NL (various dates,
most recently in November 2021)
Internal Audit proposed coverage in 2023-24 will include the following:
• ICT operational capability

Page 21

Appendix 4 (continued) 
Internal Audit coverage (recent and planned) of ‘Programme of Work to 2028’ strategic themes. 
6. One Service
Includes the following programmes, projects and activities:
• Office rationalisation
• Leadership and Operating Model
• Asset management
• Demolition and New Build
• Corporate property and repairs
Recent audit coverage on activities relevant to this strategic theme has included work on Business
continuity planning (July 2022), Asset rationalisation (May 2021) and Managing strategic change (June
2021).
Internal Audit proposed coverage in 2023-24 will include the following:
• Future operating model • Business continuity planning

Page 22

Appendix 5:  Internal Audit performance framework
Category Measure
Internal
Audit
management
Reported to
Chief
Executive
and CMT
Reported
to A&SP
(Quarterly)
Reported
to A&SP
(Annual)
1. Delivery of Annual Plan  Percentage completion of agreed plan X X  X
2. Targeting Percentage of key corporate risks and key financial systems over
which assurance provided X X  X
3. LGBF - Efficiency Cost of Internal Audit per £ million revenue budget X   X
4. LGBF - Efficiency % of productive hours delivered v Plan X   X
5. Delivery / recommendations Percentage implementation of agreed actions by implementation
date (cumulative year to date) X X X X
6. Delivery / other Number of significant irregularity / fraud investigations X X  X
7. Customer satisfaction results Scores from customer satisfaction questionnaires (audit
assignments) (cumulative year to date) X X X X
8. Customer satisfaction results Scores from key stakeholders (CMT and A&SP) questionnaires
(overall performance of the function) X X  X
9. Quality / standards Reliance placed by External Audit on the work of Internal Audit X X  X
10. Quality/ standards Quality review outcomes – EQAR or internal self-evaluation X X  X
11. Delivery of Annual Report Annual opinion /report prepared by 31 May annually X X  X
12. Targeting Approval by CMT and A&SP of strategy and annual plan by 31 May
annually X X  X
Internal management performance indicators
13. Efficiency Actual v planned days on completed assignments X   
14. Efficiency Time between completion of fieldwork and draft reports being issued  X   
15. Efficiency Time between draft reports and final reports being issued X