Page 1

North Lanarkshire Council
Report
Audit and Scrutiny Panel 
Does this report require to be approved? ☐ Yes   ☒ No
Ref KA/LM/ASP/Feb 2023 Date 16/02/23 
Internal Audit: Follow up of actions previously agreed by
management in response to audit recommendations 
From  Ken Adamson, Chief Officer of Audit and Risk
E-mail adamsonk@northlan.gov.uk Telephone 07939 280602 
Executive Summary
The purpose of this report is to update the Panel on the results of Internal Audit’s follow-up
work reviewing the extent to which management have implemented actions previously
committed to in response to previous Internal and External Audit recommendations.
Information is contained in respect of the last two years External Audit outputs and those
actions agreed in response to ‘High’ and ‘Medium’ Internal Audit recommendations which
were due to be completed in the period up to the end of December 2022.
The Panel should note that where actions are not yet ‘complete’ this does not mean that no
relevant activity has been undertaken by management and that the actions taken/progress
made to date will often have reduced the risk exposure in respect of the weaknesses
previously identified even if the action is not yet complete.
As reported to the Panel in December 2021, those recommendations which were previously
reported to the Panel as partially implemented but not yet complete are now monitored
against revised target implementation dates agreed with management and previously
reported to the Panel.
Seven of the twelve actions agreed in respect of External Audit outputs have been completed,
four are not yet due and one is no longer relevant.  Five of the twenty-one actions agreed in
response to relevant Internal Audit recommendations due in the period have been fully
completed and sixteen have been assessed as partially implemented.
Recommendations
The Panel is invited to:
a) note the contents of this report;
b) note the recommendations made by Internal Audit at Appendix 1; and
c) to consider whether there are any issues arising from this report on which they wish to
receive further information from relevant management.
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements

Page 2

1. Background
1.1 All Internal and External Audit reports contain management responses to audit
recommendations which generally include a commitment to specific actions by a stated
date.  This report presents an overview of progress by management in addressing all
External Audit recommendations made in the last two years and all ‘High’ and ‘Medium’
Internal Audit recommendations which were previously reported as outstanding or
where the proposed actions were due to be completed by the end of December 2022.
1.2 The format of this report is designed to allow the Panel to focus on those issues where
non-implementation of agreed actions presents the most significant ongoing risk to the
Council and to enable the Panel to hold relevant senior management to account. 
1.3 Internal Audit’s arrangements for following-up audit recommendation include, in certain
circumstances, agreeing a revised implementation date and monitoring and reporting
against these revised dates where we are provided with a strong rationale for the non-
implementation of the audit recommendation by the originally agreed date.  This avoids
repeatedly reporting and focusing on actions which are ‘late’ where there are sound
reasons for non-implementation by the originally agreed date.
1.4 This report presents the assessment of the potential risks arising from those planned
actions agreed in response to Internal Audit recommendations due in the period
(August to December 2022) which are not yet fully completed.
1.5 The updates from management on progress to date have been verified on a sample
basis by Internal Audit as part of the preparation of this report.  However, it should be
noted that this review has focused on whether planned actions have been completed
and has not included detailed substantive testing of whether the implemented actions
have been effective in addressing previously identified weaknesses. 
2. Report
Actions previously agreed by management – Internal Audit recommendations
2.1 Table 1 below shows whether management have implemented those actions previously
agreed to in response to ‘High’ and ‘Medium’ Internal Audit recommendations which
were due to be completed by the end of December 2022.  Overall, five of the agreed
actions have been completed and sixteen have been assessed as partially
implemented.
Table 1
Chief Officer Area Complete Partially
implemented
No longer
relevant Total
Asset and Procurement 0 1 0 1
Audit and Risk 0 3 0 3
Business and Digital 1 4 0 5
Finance 1 0 0 1
Legal and Democratic 0 1 0 1
People Resources 2 6 0 8
Social Work 1 1 0 2
TOTAL 5 16 0 21

Page 3

2.2 Internal Audit has reviewed the management updates and agreed with relevant
management revised implementation dates for all sixteen recommendations listed as
partially implemented at Table 1.  These recommendations will now be monitored in
line with the agreed revised date and will be reported back to the Panel in accordance
with this revised timescale, at which time consideration will be given as to whether
previously identified weaknesses have now been addressed.
2.3 Detail in respect of each of these recommendations and the current residual risk
assessed by Internal Audit as a result of partial implementation is provided in Appendix
1, in which we have also made suggestions as to how the Panel may wish to consider
these issues.  Definitions of the residual risk ratings are provided at Appendix 2.
Actions previously agreed by management – External Audit recommendations
2.4 Table 2 shows the status of actions agreed by management in response to External
Audit reports issued as part of the 2020-21 and 2021-22 audits.  Internal Audit has
concluded that seven of the twelve agreed actions have been completed, four are not
yet due and the remaining actions is no longer relevant.
Table 2 Completed Partially
implemented
Not yet
due
No longer
relevant Total Report Title/Year
2020-21
Interim Audit Report 3 0 0 1 4
Annual Report 3 0 0 0 3
2021-22
Annual Report 1 0 4 0 5
TOTAL 7 0 4 1 12
2.5 The External Audit action assessed as ‘no longer relevant’ relate to issues on which
External Audit have made a similar recommendation in subsequent audit reports. 
3. Measures of success
3.1  Internal Audit report each cycle to the Audit and Scrutiny Panel on the progress made
by management in implementing actions previously committed to in response to
Internal and External Audit reports. 
4. Supporting documentation
Appendix 1 Internal Audit recommendations - Management actions assessed as ‘not
yet complete’ in this cycle
Appendix 2   Residual risk rating definition 
Ken Adamson, Chief Officer of Audit and Risk

Page 4

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If yes, please provide a summary of the key risks and potential impacts, highlighting
where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project
Risk Registers), and how they are managed?
Failure by Services to address previously identified issues and/or weaknesses will
impact on the effectiveness of the relevant control framework.  This, depending on
the nature of the issue, will be captured and should be reflected in the relevant
service risk register or the corporate risk register (as appropriate).
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒

Page 5

Appendix 1 Internal Audit recommendations - Management actions assessed as ‘not yet complete’ in this cycle
Chief Officer
Report
Details
Details from original recommendation Current position per management
update
Original and
revised
timescales
Internal Audit comment
Chief Officer of Asset and Procurement
Enterprise
Project
(May 2022) 
Risk: Without a robust and realistic contingency plan
in place the Council may not be able to ensure
continuity of service delivery and achievement of
ambitions.
Recommendation: The Enterprise Project Board
should ensure that the key tasks required to fully
document a contingency plan, including key milestones
and lead times/critical path, is included in the project
plan and thereafter monitor development of the
contingency plan to ensure that an alternative ‘Plan B’
is available, and lead times/critical path are clearly
understood should the project not be able to be
progressed as currently envisaged.
Category: Medium
The Project Board has set out the actions
required to be taken, to mitigate the identified
risks at this stage of the project, in a report to
the Policy and Strategy Committee in
December 2022.  Committee approved these
actions which are now being progressed and
include consideration of contingency planning
requirements as appropriate, which will inform
the way forward.
Original
timescale:
July 2022 
Revised
timescale:
December 2022 
Further revised
timescale: 
September 2023 
We acknowledge that work in this area has been
ongoing and action to be taken to mitigate the
identified risks were outlined in a report to the
Policy and Strategy Committee in December
2022.
Given that further action is required to fully
address the recommendations we assess the
residual risk as ‘Medium’ and consider it
important that the agreed extension date of May
2023 is achieved.
We would suggest that the Panel may wish to
consider agreeing to note the progress made
and the revised completion date and to monitor
progress being made as part of the next follow-
up report.
Chief Officer of Audit and Risk
Risk
Management
(July 2022) 
Risk: Without appropriate training, staff may not be
aware of their roles in respect of risk management.
Recommendation: The Head of Audit and Risk
should:
(1) remind Services of the need to complete and
monitor uptake of the mandatory risk management
training by staff;
(2) determine how best to capture/monitor the uptake
of mandatory training module for each Service and
the Council as a whole in accordance with
expected timescales, ensuring that this is regularly
monitored, and action taken as appropriate on any
issues arising, by the Corporate Risk Team and
RMCWG; and
(3) ensure the risk network training is finalised and
implemented within a reasonable timescale.
Category: Medium
Services have been reminded of the need to
complete and monitor uptake of mandatory risk
training.
Data on the uptake of the mandatory risk
management training module is now available
and the RMCWG members will now seek to
agree and implement an approach to monitor
the uptake. 
The risk network training has been postponed
pending changes to the risk scoring approach
which is proposed as part of the review of the
Risk Management Strategy which is due to be
submitted to Policy and Strategy for approval in
March 2023.  The training will be launched in
April 2023 and will reflect the revised strategy.
Original
timescale: 
October 2022 
Revised
timescale: June
2023 
We acknowledge that there has been significant
action taken to address the recommendations
made and that delay in finalising and
implementing the risk network training were
necessary to ensure this fully reflects the revised
Risk Management Strategy.  However, it is
important that the outstanding actions are
addressed and actioned in line with revised
timescales.
We consider the revised timescale to be
reasonable and have assessed the residual risk
for this recommendation as ‘Low’. 
Accordingly, we would suggest that the Panel
may simply wish to consider agreeing to note the
progress made and the revised completion date.

Page 6

Appendix 1 (continued) Internal Audit recommendations - Management actions assessed as ‘not yet complete’ 
Chief Officer
Report
Details
Details from original recommendation Current position per management update
Original and
revised
timescales
Internal Audit comment
Chief Officer of Audit and Risk
Risk
Management
(July 2022)
Risk: Management may lack assurance on the
extent to which key expectations/requirements
contained the strategy are being complied with.
Without formal processes in place for reporting risk
issues, management may not be able to take
appropriate or timely action to address these risks.
Recommendation: The Head of Audit and Risk
should ensure that:
(1) work continues to develop a framework,
including suitable KPIs, to appropriately
monitor compliance with key aspects of the
Risk Management Strategy, with areas for
improvement being captured and thereafter
tracked and monitored; and
(2) clear expectations regarding consideration,
monitoring and reporting of risk are
incorporated into the revised Risk Management
Strategy so that Services can incorporate this
into their individual governance arrangements.
Category: Medium
Development of a draft compliance approach is being
progressed through the RMCWG and will be incorporated into
the updated/revised Risk Management Strategy which is due
to be presented to the Policy and Strategy Committee in
March 2023.  It is thereafter intended that the new approach
to compliance monitoring will commence for 2023/24.  The
revised Risk Management Strategy will make clear
expectations and the detailed process/KPIs etc.
Expectations around consideration, monitoring and reporting
of risks are being progressed through the RMCWG and will be
clarified in the revised Risk Management Strategy.  Revised
governance arrangements for the CMT, the new Business
Management Team (BMT) and SMT/DMTs were approved at
CMT in December 2022.  The terms of reference for all groups
explicitly include each group’s remit in relation to risk
management.
In addition, a reporting matrix is being developed that sets out
organisational (including service) reporting expectations.  A
Risk Management planning tool is also being developed to
provide oversight of key risk management activities (including
reporting), and their timing across 2023.
Original timescale: 
December 2022 
Revised
timescale: April
2023 
We acknowledge that there has been
significant action taken to address the
recommendations made and that the
revised Risk Management Strategy
will reflect the proposed compliance
approach and the monitoring and
reporting of risks but consider it
important that these are finalised and
implemented in line with the revised
timescale. 
We consider the revised timescale to
be reasonable and have assessed the
residual risk for this recommendation
as ‘Low’. 
Accordingly, we would suggest that
the Panel may simply wish to consider
agreeing to note the progress made
and the revised completion date.
Risk: The absence of a fully documented corporate
risk register, subject to regular monitoring and
challenge may mean that key stakeholders may fail
to fully understand the key risks the Council faces
and in turn may consequently fail to take
appropriate action to mitigate them.
Recommendation: The Head of Audit and Risk
should ensure that the replacement and/or new
corporate risks detailed in the finding are
documented, assessed and moved to ‘live’ status
with a reasonable timescale.
Category: Medium
The corporate risks on Supply Chain and the Scottish Child
Abuse Inquiry have been developed, agreed and are now
‘live’.
The corporate risk in relation to the National Care Service
proposals has been documented as much as can be based on
current information available.  This will continue to be
developed as the national policy direction progresses and the
current level of uncertainty reduces.
Significant effort has gone into further developing and
documenting the two remaining corporate risks (Educational
Outcomes and Target Operating Model). These are, however,
both in draft format and require further discussion and
development with the relevant Risk Leads before being
agreed and finalised.
Original timescale:
September 2022 
Revised
timescale:
December 2022 
Further revised
timescale:
March 2023
Whilst we acknowledge that there has
been significant action taken to
address the recommendations made,
it is important the two remaining risks
are finalised and moved to ‘live’ status
at an early opportunity.
We consider the revised timescale to
be reasonable and have assessed the
residual risk for this recommendation
as ‘Low’. 
Accordingly, we would suggest that
the Panel may simply wish to consider
agreeing to note the progress made
and the revised completion date.

Page 7

Appendix 1 (continued) Internal Audit recommendations - Management actions assessed as ‘not yet complete’ 
Chief Officer
Report
Details
Details from original recommendation Current position per management
update
Original and
revised
timescales
Internal Audit comment
Chief Officer of Business and Digital 
Digital NL
(November
2021)
Risk: Benefits and savings may not be being
adequately tracked and monitored resulting in
the Council being unable to demonstrate the
achievement of the objectives of the
programme.  
Recommendation: Management should
ensure that the non-financial benefits tracker
is finalised and approved with non-financial
benefits thereafter identified, calculated,
tracked and monitored for all workstreams.
Category: Medium
The non-financial benefits tracker templates for
each of those sprints already live have been
created and populated.  Tracker templates for
the Year 4 Roadmap have been created and will
be populated with the Benefits Map detail for
each sprint as that work progresses.
From a governance perspective, consideration of
the non-financial benefits tracker will focus
heavily at the Project and Delivery Board
meetings.
Original timescale: 
April 2022 
Revised timescale:
September 2022 
Further revised
timescale: 
March 2023
Whilst we acknowledge that there has been some
action taken in this area, we consider that it is
important going forward that non-financial benefits
are identified and captured in a timely and consistent
manner for those sprints not yet underway/at an
early stage. 
We have assessed the residual risk as ‘High’ as the
recommendation has not yet been fully addressed by
management and consider it important that the
revised timescale is adhered to.
In response to the Panel’s request following
consideration of an update on progress against this
recommendation at the November meeting, a
separate report is included on the agenda from the
Service regarding this recommendation, progress
made and further proposed actions.

Page 8

Appendix 1 (continued) Internal Audit recommendations - Management actions assessed as ‘not yet complete’ 
Chief Officer
Report
Details
Details from original recommendation Current position per management update
Original and
revised
timescales
Internal Audit comment
Chief Officer of Business and Digital 
Governance of
Capital
Projects
(December
2019) 
Risk: If Services are aware of the projects which will
be reviewed, they are more likely to follow the guidance
for those projects and the results of any such reviews
may not provide a true representation of the extent of
compliance with expected arrangements, including use
of the relevant guidance and control template
documents.
Recommendation: Management should review the
‘project management model review programme’,
particularly in relation to:
• expanding the sample of projects being reviewed
to incorporate some capital and non-capital
projects that Services have not received advance
notification; and
• reviewing and updating the checklist to include
consideration of the adequacy and effectiveness of
the completed control document templates,
determination of whether established processes
have been documented and confirmation that key
stakeholders have been adequately updated on
the progress of the project, in line with the
suggested improvements at Appendix 3.
Category: Medium
Project Registers have now been received from all
Heads of Service and a quality assurance review
process is being established to support the Project
Management Framework.
The quality assurance review programme, and the
timings of each review to be undertaken, is informed
by the Project Registers which each Chief Officer is
required to maintain.
Recently revised governance arrangements will now
require the Programme/Project Boards to provide
regular updates to CMT.
A report is being submitted to CMT in early 2023
which will take into consideration the governance,
oversight, monitoring and quality assurance
processes that support the work of
Programme/Project Boards in delivering on the wide
range of programmes and projects set out in the
Project Registers. 
Original timescale:
June 2020 
Revised timescale: 
September 2022 
Further revised
timescale:
June 2023
Given that further action is required to
progress arrangements for monitoring
compliance with the refreshed project
management framework, we have
assessed the residual risk as ‘Medium’
and consider it appropriate that more
detailed plans and timescales are
identified by management at an early
stage 
In response to the Panel’s request
following consideration of an update on
progress against this recommendation
at the November meeting, a separate
report is included on the agenda from
the Service regarding this
recommendation, progress made and
further proposed actions.

Page 9

Appendix 1 (continued) Internal Audit recommendations - Management actions assessed as ‘not yet complete’ 
Chief Officer
Report Details Details from original recommendation Current position per
management update
Original and
revised
timescales
Internal Audit comment
Chief Officer of Business and Digital
Managing
Strategic Change
(June 2021)
Risk: Key stakeholders may not be adequately
informed of progress in the Council’s key
corporate projects and may not be able to
undertake effective oversight and/or ensure that
timely remedial action, necessary to ensure that
projects are delivered successfully, has been
progressed by relevant management. 
Recommendation: Management should progress
the previously identified action of establishing a
reporting mechanism which better facilitates
regular and ongoing oversight by key stakeholders
of the progress of key projects against plan,
including management of key risks, progress
against timelines, cost against budget,
achievement or otherwise of key milestones and
expected outcomes or benefits realisation.  We
suggest that this could include introducing a
standard reporting template and adopting a traffic
light system to report progress against key criteria,
project milestones and overall deliverability
against expected time, cost and any other
intended outcomes. 
Category: Medium
The consultative draft of the Project
Management Framework was
approved at CMT in September
2022.
It was thereafter updated in
November 2022 to include reference
to the reporting requirements for all
stakeholders.  The final Framework
and supporting documentation were
then uploaded to the Council’s
intranet and an NLC announcement
issued to staff to notify them of this. 
Original timescale:
September 2021 
Revised timescale: 
September 2022 
Further revised
timescale:  To be
determined by
management
The Service consider this action to be complete as the
project management framework has now been
updated and uploaded to the Council’s intranet. 
However, while we acknowledge that the Project
Management Framework has been revised and
approved, we consider that the narrative within the
Framework, whilst referencing the need to report to all
key stakeholders, does not fully address the
recommendation which required that there be a
mechanism to facilitate regular and ongoing oversight
by key stakeholders of the progress of key projects
against the plan.
We have assessed the residual risk as ‘High’ as the
recommendation has not yet been fully addressed by
management and consider it important that a realistic
revised timescale is determined and adhered to.
In response to the Panel’s request following
consideration of an update on progress against this
recommendation at the November meeting, a separate
report is included on the agenda from the Service
regarding this recommendation, progress made and
further proposed actions.

Page 10

Appendix 1 (continued) Internal Audit recommendations - Management actions assessed as ‘not yet complete’ 
Chief Officer
Report Details Details from original recommendation Current position per
management update
Original and
revised
timescales
Internal Audit comment
Chief Officer of Business and Digital
Performance
Management
(October 2022) 
Risk: It may be difficult to clearly demonstrate
progress, improvement or achievement of the
Council’s ambition statements and programme of
work items, which could result in the Council failing
to meet its obligations in relation to best value, good
governance and public performance reporting.
Recommendation: The Head of Business and
Digital, in conjunction with all Services, should:
(1) as part of the refresh of the SPF, ensure that
consideration is given to all level 2 and 3
indicators to determine whether improvements
in these performance indicators provide
meaningful information in respect of
progressing/achieving the ambition statements
and programme of work items that they are
linked to.  This review should include the
removal of any indicators which are not directly
linked to planned outcomes and the
identification of new indicators to assist with the
monitoring of progress of ambition statements
and key programme of work items; 
(2) consider preparing a document (or adding to
existing documentation such as the SPF) which
clearly indicates the Chief Officer responsible
for each performance indicator; and
(3) identify a suite of key performance
indicators/reporting mechanism(s) that would
facilitate effective scrutiny and challenge by
CMT and elected members.  
Category: Medium
The review and refresh of the Strategic
Performance Framework is underway
and is awaiting the outcome of the
Programme of Work Development
Group to ascertain items to be
included in the 2023 to 2028
Programme of Work and identify any
performance related requirements
therein.
The list of Calculating Officers and
Verification Officers clearly show the
corresponding service for each
indicator in the Framework.
A report submitted to CMT in
December 2022 outlined the
Performance Reporting Schedule for
2023 to 2024, which will facilitate
scrutiny and challenge by CMT and
elected members.  Once formally
approved, the Strategic Performance
Framework document will be finalised
accordingly.
Original timescale:
December 2022 
Revised timescale: 
March 2023
We acknowledge that work in this area to review and
refresh of the Strategic Performance Framework has
been ongoing, however further action is required to
fully develop and thereafter implement the Strategic
Performance Framework, and we have assessed the
residual risk as ‘Low’.  We consider it important that
the agreed extension date of March 2023 is achieved.
Accordingly, we would suggest that the Panel may
simply wish to consider agreeing to note the progress
made and the revised completion date.

Page 11

Appendix 1 (continued) Internal Audit recommendations - Management actions assessed as ‘not yet complete’ 
Chief Officer
Report Details Details from original recommendation Current position per management
update
Original and
revised timescales Internal Audit comment
Chief Officer of Legal and Democratic
Corporate
Governance
Principles E, F & G
(March 2021)
Risk: The Council may not be able to adequately
demonstrate that it has effective audit committee
arrangements and/or arrangements to ensure
elected members have the skills, knowledge and,
where appropriate or required, access to relevant
training and resources to effectively undertake their
role.
Recommendation: The Head of Legal and
Democratic Solutions should:
(1) in conjunction with the Audit and Risk Manager,
seek to introduce a formal process whereby the
Audit and Scrutiny Panel periodically
undertakes a self- assessment of their
performance and activities against the
‘CIPFA’s Audit Committees: Practical
Guidance for Local Authorities and Police
(2018)’, with a report outlining the results of this
review including any improvement actions
being presented to the Panel and reported to
the Policy and Strategy Committee.
(2) In conjunction with the Business Strategy
Manager, seek to introduce a formal process
whereby the Audit and Scrutiny Panel
periodically undertakes a separate self-
assessment of the effectiveness of the
performance and activities of the Panel in
discharging the Scrutiny aspect of its role. 
Category: Medium
The Strategic Self-Evaluation Review
Programme has been updated to reflect
this self-valuation exercise and a report
was approved by the Audit and Scrutiny
which re-establishes the role of the
scrutiny work programme in the Panel’s
activities.
Membership of the Audit and Scrutiny
Panel changed significantly following the
Local Government elections in May 2022. 
However, following this there have only
been two meetings of the Panel which is
not considered enough time to for
arrangements and the new Panel to be
embedded. 
Original timescale:
September 2021 
Revised timescale: 
December 2022 
Further revised
timescale:
September 2023
We acknowledge that delivery of this action
has been delayed allowing for the significant
changes to the membership of the Audit &
Scrutiny Panel following the Local
Government elections in May 2022 to be
embedded. 
We consider the revised timescale to be
reasonable and have assessed the residual
risk for this recommendation as ‘Low’. 
Accordingly, we would suggest that the Panel
may simply wish to consider agreeing to note
the progress made and the revised
completion date.

Page 12

Appendix 1 (continued) Internal Audit recommendations - Management actions assessed as ‘not yet complete’ 
Chief Officer
Report Details Details from original recommendation Current position per
management update
Original and
revised
timescales
Internal Audit comment
Chief Officer of People Resources
Information
Governance/
Security
(February 2021) 
Risk: Staff may not understand that responsibilities for
information governance and security which could result
in significant additional financial and reputational costs in
the event of any information breach.  The ICO has
historically been particularly critical of organisations who
suffer breaches and who cannot demonstrate that they
have effectively identified and addressed staff training
needs.
Recommendation: The Head of People and
Organisational Development, in conjunction with the
Head of Business Solutions, should progress the
creation of a less intensive training for staff/roles who are
not required to undertake the mandatory training
modules.
Category: High
Following a successful recruitment
campaign, additional staff have now
joined the team and this action is now
being taken forward.  A learning
resource is being created which will
cover all areas required for information
security at this level and this will be
rolled out throughout Quarter 4 to all
staff. 
Line managers will be trained to deliver
the training within team
meetings/toolbox talks to roll out the
learning.  The learning will then be
recorded on LearnNL and reported to
the Data Governance Group on a
quarterly basis along with other
mandatory learning statistics.
Original
timescale:
August 2021 
Revised
timescale: 
December
2022 
Further
revised
timescale:
March 2023
We acknowledge that delivery of this action has been
delayed due to a turnover of staff with the Team.
Whilst we are satisfied that appropriate steps have
been taken to recruit an officer, it is imperative that
this issue be resolved in line with the revised
timescale. 
We consider the revised timescale to be reasonable
and have assessed the residual risk for this
recommendation as ‘Low’. 
Accordingly, we would suggest that the Panel may
simply wish to consider agreeing to note the progress
made and the revised completion date.

Page 13

Appendix 1 (continued) Internal Audit recommendations - Management actions assessed as ‘not yet complete’ 
Chief Officer
Report Details Details from original recommendation Current position per management
update
Original and
revised
timescales
Internal Audit comment
Chief Officer of People Resources
Corporate
Governance
Principles A & B 
(February 2022) 
Risk: Where individuals are not fully aware of expected codes
of conduct, ethical standards, and legal obligations they may
not be in a position to adhere to or embed these consistently,
or to identify and/or challenge unacceptable actions or
behaviours of other staff where they occur.
The Council may not be able to adequately demonstrate that
it has effective arrangements to ensure elected members have
access to training and development opportunities to equip
them with the necessary skills and experience to perform their
role effectively
Recommendation: The Head of People and Organisational
Development, in conjunction with relevant management,
should:
(1) ensure that all staff are periodically/regularly made
aware/reminded of the revised Employee Code of
Conduct and the need to adhere to it;
(2) progress plans to introduce mandatory training on the
revised Code and ensure that uptake for both the
Induction and Code of Conduct training is being actively
monitored; and
(3) undertake the planned review of the elected members site
within Learn NL and consider the scope for introducing
mandatory or highly recommended courses and
encouraging the uptake of relevant training courses
Category: Medium
(1) Complete - The Council's Code of
Conduct has been re-communicated
to all staff with all-user emails and
campaigns on Connect after each
revision.  Regular/periodic reminders
will be issued to all staff to ensure that
they are reminded of the Code and the
need to adhere to it. 
(2) The mandatory training on the
Employee Code of Conduct is being
progressed and this will be launched
in 2023. 
(3) Complete - A review of the Elected
Members site within LearnNL has
been completed and a number of
training modules designated as
mandatory.  Some training sessions
are now recorded to enable Elected
Members to access them later, as
required.
Original timescale:
December 2022 
Revised timescale: 
March 2023 
Whilst we acknowledge that there
has ben significant action taken to
address the recommendations
made, it is important that the
mandatory training is finalised and
launched in line with the proposed
timescale.
We consider the revised timescale
to be reasonable and have
assessed the residual risk for this
recommendation as ‘Low’. 
Accordingly, we would suggest
that the Panel may simply wish to
consider agreeing to note the
progress made and the revised
completion date.

Page 14

Appendix 1 (continued) Internal Audit recommendations - Management actions assessed as ‘not yet complete’ 
Chief Officer
Report Details Details from original recommendation Current position per
management update
Original and
revised
timescales
Internal Audit comment
Chief Officer of People Resources
Corporate
Governance
Principles A & B 
(February 2022) 
Risk: Without effective workforce planning there is a risk
the Council may not have in place (or identified the
actions it needs to progress to ensure it has in place) the
staff and skills it needs to enable it to deliver services and
achieve planned outcomes 
Recommendation: The Head of People and
Organisational Development should ensure that the
service workforce plans are completed and reported in
accordance with the revised timescales to inform future
workforce planning activity. 
Category: Medium
Work was underway to complete
workforce plans within each service. 
However, a request was submitted to,
and approved by CMT, in December
2022 to extend the deadline for
completion into 2023 thus allowing
more time for consideration of any
significant workforce/training impacts,
including service cessation, which may
arise from the Council’s 3-year budget
setting process.
A summary report is thereafter
scheduled to be presented to the
Policy and Strategy Committee in
Cycle 2.
Original timescale:
June 2022 
Revised
timescale: 
December 2022 
Further revised
timescale:
June 2023
We acknowledge that an extension to the proposed
timescale was granted by CMT to allow for
consideration of the impact of the Council’s 3-year
budget on Services’ workforce plans.  We consider
the revised timescale to be reasonable and have
assessed the residual risk for this recommendation
as ‘Low’. 
Accordingly, we would suggest that the Panel may
simply wish to consider agreeing to note the
progress made and the revised completion date
ESC: Testing of
Selected Key
Controls 
(March 2022)
Risk: Failure to apply conditions of service appropriately
could lead to inconsistency and/or errors in payments
made to employees across the Council.
Recommendation: The Head of People and
Organisational Development should ensure that HR
Business Partners, in conjunction with service
management, review how non-core hours have been
calculated for all relevant employees in receipt of a
standing non-core hours payment each pay period to
ensure that these are accurate and consistent with the
employee’s work pattern/rota and Schedule A.
Category: Medium
There has, to date, been no change in
the position.  The service has identified
that all relevant parties need to engage
in a discussion to ensure that a
consistent approach is agreed and
thereafter implemented for the new
financial year.
Any changes to non-core hour
procedures will need to be discussed
and agreed with the Trade Unions.
Original timescale:
December 2022 
Revised
timescale:  March
2023
We acknowledge that delay in implementing this
action is due to competing priorities and the need
to discuss any changes to the processes with the
Trade Unions.
Following discussion with service representatives,
a clear commitment has been given to implement
the recommendation by the agreed extension date
and as such we have assessed the residual risk for
this recommendation as ‘Low’.
Accordingly, we would suggest that the Panel may
simply wish to consider agreeing to note the
progress made and the revised completion date.

Page 15

Appendix 1 (continued) Internal Audit recommendations - Management actions assessed as ‘not yet complete’ 
Chief Officer
Report Details Details from original recommendation Current position per
management update
Original and
revised
timescales
Internal Audit comment
Chief Officer of People Resources
Supporting
Attendance
(August 2022)
Risk: There would be no record of the key absence
issues and/ or any proposed actions to be taken to
address these issues having been discussed
Management may not be able to take appropriate action
to address key issues.
Without formal documented processes outlining how
performance information should be prepared, staff may
not be aware of how to calculate the performance
measures which may result in inaccurate performance
data being reported to key stakeholders.
Recommendation: People and Organisation
Development should ensure that monthly performance
information on sickness absence is reported as standard
across all Services at SMT meetings, any key issues in
relation to absences are discussed with senior
management at these meetings and that appropriate
documentation is maintained to support the effective
monitoring of any management actions identified and/or
taken to address these issues.
Category: Medium
High-level monthly performance
information on sickness absence
is provided to HR Business
Partner teams by Employee
Relation for them to cascade this
information to Services to enable
discussion at the Services’ SMT
meetings.  
A working group is being
established to develop an action
plan to ensure that there is a
consistent approach to the
cascading of information and that
appropriate actions are
developed by each Service.
Original timescale:
December 2022 
Revised timescale: 
September 2023 
We acknowledge that some action has been taken to
address the first part of the recommendation and that
the delay in implementing the second part of the
recommendation is due to competing priorities and
resource issues within the POD teams. 
As a result of the above, we have assessed the
residual risk for this recommendation as ‘Low’ and
would suggest that the Panel may simply wish to
consider agreeing to note the progress made and the
revised completion date.

Page 16

Appendix 1 (continued) Internal Audit recommendations - Management actions assessed as ‘not yet complete’ 
Chief Officer
Report Details Details from original recommendation Current position per
management update
Original and
revised
timescales
Internal Audit comment
Supporting
Attendance
(August 2022)
Risk: Without a formal review of the Policy it would
be difficult to determine if the new policy is effective.
Without a formal action plan, it would be difficult to
monitor and track identified improvement actions and
the progress and resultant impact of those actions.
Management may not be able to take appropriate
action to address issues identified.
Management may lack assurance on the extent to
which key expectations/requirements contained the
policy are being complied with.
Recommendation: People and Organisation
Development should:
(1) undertake a formal review of the effectiveness
and impact of the new Supporting Attendance
Policy;
(2) capture any agreed improvement actions for
sickness absence in a corporate action plan,
progress against which is then tracked and
monitored; and
(3) undertake periodic compliance reviews on a
sample of services and/or service areas and/or
individual absence cases to determine the extent
to which the revised Supporting Attendance
policy is being implemented across the Council
in line with corporate expectations.
Category: Medium
(1) Meetings have been held with
the Trade Unions with a view to
reviewing the Supporting
Attendance Policy. The Service
are awaiting a response from the
Trade Unions on proposed
minor changes to the supporting
toolkits. 
(2) An action plan will be developed
once discussions with the Trade
Unions have concluded.
(3) Periodic compliance reviews will
form part of the action plan
referred to at point (2) above.
The extent of these reviews is
still to be determined.
Original timescale:
December 2022 
Revised timescale: 
September 2023
We acknowledge that delay in implementing this action
is due to competing priorities and resource issues
within the POD teams. In addition, points (2) and (3)
cannot be progressed until discussions are concluded
with the Trade Unions.
Given that limited action has been taken to date to
address the recommendation and improve the control
environment we assess the residual risk as ‘Medium’
and consider it important that the agreed extension
date of September 2023 is achieved.
We would suggest that the Panel may wish to consider
agreeing to note the progress made and the revised
completion date and to monitor progress being made
as part of the next follow-up report.

Page 17

Appendix 1 (continued) Internal Audit recommendations - Management actions assessed as ‘not yet complete’ 
Chief Officer
Report Details Details from original recommendation Current position per management
update
Original and
revised
timescales
Internal Audit comment
Chief Social Work Officer
Tackling Poverty
(November 2021)
Risk: Without accurate baseline data, the Council
may not be able to review progress and/or predict
with any accuracy whether it is on track/can achieve
the Scottish Government’s statutory poverty targets
and/or whether the identified actions are reasonable
and appropriate.
Without clear and realistic short, medium and long-
term targets, the tackling poverty programme may
not be able to achieve its objectives.
Without effective performance management
framework and formal benefits realisation processes,
management may not be able to assess whether the
tackling poverty programme is effective and/or may
not be able to take appropriate action to address
areas of ‘under-performance’ and/or properly assess
and/or compare impact of different
actions/interventions.
Recommendation: Management should:
(1) establish what information requires to be collated
in respect of measuring the Scottish
Government’s poverty targets and identify and
progress any actions necessary to ensure that
the Council can generate and/or gather the
relevant data within expected timescales;
(2) develop and implement more robust
performance monitoring and benefits realisation
frameworks that will allow management to better
measure performance against the Council’s
Tackling Poverty objectives and the Scottish
Government targets; and
(3) use the revised performance monitoring and
benefits realisation frameworks to facilitate more
robust setting of short and medium-term targets
and to assist in the evaluation of impacts of
different actions.
Category: High
Performance in respect of some elements
of the Tackling Poverty programme is
being monitored (for example income
maximisation), however the Service is still
working to establish a performance
framework.  This has been hampered by
the limited guidance and detail provided
by the Scottish Government in respect of
setting targets and baselines and this
applies to all local authorities.
A Data Sub-Group, consisting of officers
from the Council, North Lanarkshire
Council, Third Sector and other
Community Planning Partners has
recently been established as part of the
governance arrangements for Tackling
Poverty.  This Sub-Group will be tasked
with:
• overseeing the data collection to
support the Tackling Poverty Strategy
and Local Child Poverty Action Report
(LCPAR)
• collating, and thereafter interpreting
and analysing, the data and
pinpointing the location of vulnerable
residents to allow resources to be
targeted appropriately; and
• developing methods to measure the
data/activity of the Tackling Poverty
Strategy action plan, including the
LCPAR, to allow the reporting of
outcomes and tracking of targets set
by the action plans and the Scottish
Government targets for child poverty.    
Original timescale:
November 2022 
Revised timescale: 
November 2023
Whilst we acknowledge that, there has been
some action taken in this area, it has been
recognised by the Scottish Government that
establishing a baseline and tracking progress on
meeting the targets for child poverty is a complex
matter and will take time to establish a model that
will allow outcomes/measures to be more
effectively monitored, measured and delivered. 
Given that significant action is required to improve
the control environment and implement the
recommendations, we assess the residual risk as
‘Medium’ and consider it important that the
agreed extension date of November 2023 is
achieved.
We would suggest that the Panel may wish to
consider agreeing to note the progress made and
the revised completion date and to monitor
progress being made as part of the next follow-up
report.

Page 18

Appendix 2  Residual risk rating definition
Internal Audit assessment of residual risk from non-implementation 
High Non-implementation of actions has the potential to significantly undermine the relevant control environment.
Medium Non-implementation of actions has the potential to impact upon the achievement of the control environment.
Low Other issues which require management attention but which pose less significant or less immediate impacts to the control environment.