Democracy Spraffa

Strategic Frameworks Annual Position Statement

North Lanarkshire Council · 24 November 2022
Back to Audit and Scrutiny Panel — 24 November 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

North Lanarkshire Council
Report
Audit and Scrutiny Panel 
Does this report require to be approved? ☐ Yes   ☒ No
Ref KH/SL Date 24/11/22 
Strategic frameworks annual position statement 
From  Katrina Hassell, Head of Business and Digital  
E-mail HassellK@northlan.gov.uk Telephone 07903 096 121 
Executive Summary
Members of the Audit and Scrutiny Panel are aware of the inter-related strategic
frameworks where the benefits to be gained by avoiding duplication and enhancing
alignment across these frameworks are key to assessing the success of The Plan for North
Lanarkshire, while ensuring each stage of delivery towards achieving the overall vision is
appropriately planned, guided, implemented, and governed.   
The six frameworks focus on ensuring a corporate one council approach in respect of
Policy, Governance, Performance, Self-Evaluation, Project Management, and
Demonstrating Improved Outcomes for Communities. To ensure these frameworks remain
aligned to The Plan for North Lanarkshire, each is on a programme to undergo a regular
review and refresh exercise. 
Delivering the council’s long-term vision within such a fast moving, unpredictable,
challenging, and complex local government environment means the ongoing effectiveness
of the Frameworks is therefore vital not only to support delivery of the long-term vision and
business as usual activities, but also to ensure this is undertaken within the appropriate
governance, performance, and control frameworks. 
Various reports in respect of these Frameworks have been considered by the Audit and
Scrutiny Panel during the last year in line with their responsibility to provide an independent
review of the council’s governance, risk management, performance, and control
frameworks.  This composite report therefore sets out the corresponding annual position
statement for each Framework for the information of the Panel in line with their remit.
Recommendations
It is recommended that the Audit and Scrutiny Panel: 
(1) Acknowledge the annual position statement for each Framework and the next steps
to ensure each remains aligned to The Plan for North Lanarkshire, monitors delivery
towards achieving the overall vision, and ensures delivery is appropriately planned,
guided, implemented, and governed, and
(2) Are aware that a corresponding Review Programme supports each Framework which
ensures that all relevant matters are kept under review, updated as required, and
reported to the relevant committee.

Page 2

1. Background 
1.1 The Plan for North Lanarkshire is now well established as the long-term strategic
direction for the council, partners, and other stakeholders and, most importantly, for
each unique local community and the people who Live, Learn, Work, Invest, and Visit
within North Lanarkshire.  It’s a Plan with a shared ambition of inclusive growth and
prosperity for all and a fairer distribution of wealth across all local communities. 
1.2 As the delivery vehicle for the shared ambition, the Programme of Work - now in its
fourth iteration (with plans approved to the end of 2022/23) - enables a recurring and
dynamic approach to realising the shared ambition.  It enables delivery of the long-term
vision to be informed by an annual strategic planning process that is influenced by
national policy changes and new developments which impact on the achievement of
the vision and which require to be reflected in the development of future strategies,
policies, plans, and programmes of work. 
1.3 The strategic frameworks supporting The Plan for North Lanarkshire are equally well
established: 
• Strategic Policy Framework
• Strategic Governance Framework
• Strategic Performance Framework
• Strategic Self-Evaluation Framework 
• Project Management Framework 
• Framework for Demonstrating Improved Outcomes for Communities 
1.4 These inter-related frameworks are key to assessing the success of The Plan for North
Lanarkshire and ensuring a corporate one council approach.  They are also key to
monitoring delivery towards achieving the overall vision and ensuring each stage is
appropriately planned, guided, implemented, and governed.   
1.5 The ensure these frameworks continue to align to, and support delivery of, The Plan
for North Lanarkshire all are on a programme for a regular review and refresh exercise. 
1.6 This report follows on from previous annual updates on the Frameworks presented to
the Audit and Scrutiny Panel in September 2020 and September 2021.  It sets out the
current position statement for each Framework to provide a composite update in
support of the Audit and Scrutiny Panel’s strategic oversight and governance role. 
2. Update 
1. Strategic Policy Framework 
Background 
2.1 Initially approved in September 2018, the Strategic Policy Framework aims to ensure
that strategies, policies, and plans supporting delivery of The Plan for North Lanarkshire
are formulated, developed, implemented, monitored, and reviewed in a consistent and
transparent manner across the council.  The Framework therefore sets out the high-
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements

Page 3

level strategies, policies, and plans which are subject to a formal review process to
ensure they remain fit for purpose and continue to align to the strategy of the council. 
2.2 Since implementation many strategies, policies, and plans have been newly developed,
reviewed and updated, approved, and implemented to support achievement of the long-
term vision. 
2.3 This was acknowledged in the Audit Scotland interim management report in June 2021
which concluded by categorising the related recommendation from the 2019 Best Value
Assurance Report (BVAR) as complete given the “robust process in place to ensure
policies and strategies are kept up to date and regularly reviewed to ensure they are
aligned to The Plan and any laws and regulations”. 
Current position 
2.4 The Strategic Policy Framework has undergone various updates since initially
approved, with the most recent position being reported to the Policy and Strategy
Committee in March 2022. 
2.5 The report in March 2022 followed the annual review process which focussed on: 
• An update of the Review Programme to ensure all strategies, policies, and plans
are kept under review, updated as required, and reported to committee. 
• Identifying any gaps in terms of strategy or policy development in line with the five
priorities set out in The Plan for North Lanarkshire.
• A review of the supporting guidance to ensure strategies, policies, and plans are
developed in a standardised manner, consistently use a common format, and roles
and responsibilities are clear.  This included strengthening the guidance to ensure
appropriate consultation and engagement with all relevant stakeholders,
consideration of the impact of the pandemic and the resultant social and economic
effects locally, and enhancing cross service collaboration to avoid strategies or
policies pulling in different directions.  
• The integration of impacts into the guidance for developing strategies, policies, and
plans, as appropriate, e.g. similar to the impacts on the committee report template
(e.g. carbon, technology/digital, data protection, equalities, etc).
• Further development of the hierarchy approach supporting the Strategic Policy
Framework in order to provide a clear structure for the development of strategies
and policies that differentiates between strategies or polices designed to ensure
compliance with laws and regulations, facilitate delivery of The Plan for North
Lanarkshire, or standardise internal processes. 
2.6 The Strategic Policy Framework review programme has continued throughout 2022
with new (or updated) strategies, policies, and plans approved at committee in respect
of the following: 
• North Lanarkshire Tourism Strategy - February 2022
• North Lanarkshire Social Enterprise Framework - February 2022
• Climate Plan: Action on Climate Together 2030 - February 2022
• Digital and IT Strategy - February 2022
• Corporate Asset Management Plan - September 2022
• Procurement Strategy - September 2022 
Next steps 
2.7 Developments over the years within both the Strategic Policy Framework and

Page 4

Programme of Work meant there had been overlap.  This was resolved in the March
2022 report to the Policy and Strategy Committee when the delineation was made and
strategies, policies and plans were only included in the Strategic Policy Framework
moving forward. 
2.8 As such, the Strategic Policy Framework Review Programme is scheduled to undergo
an annual review and update process with a view to reporting an updated position to
the Policy and Strategy Committee in March 2023.   
2. Strategic Governance Framework 
Background 
2.9 The Strategic Governance Framework brings the principles of good governance
together with legislative requirements and management processes by which the council
is directed and controlled and through which it is accountable to, engages with, and
leads the local community.  It sets out the council’s local code of governance in line
with the national Delivering Good Governance in Local Government: Framework
(2016). 
2.10 The Strategic Governance Framework recognises the importance of good governance
in terms of meeting statutory Best Value obligations and ensuring the council is able to
effectively pursue the long-term ambition set out in The Plan for North Lanarkshire,
while ensuring this is underpinned with control and the management of risk, and: 
• Resources are directed in accordance with agreed policies and according to
priorities, and in line with corporate Project Management procedures.
• There is sound and inclusive decision making.
• There is clear accountability for the use of those resources in achieving defined
outcomes for service users and local communities. 
2.11 Initially approved in February 2020, the Strategic Governance Framework went through
a substantial review and refresh process in June 2021 which was endorsed by the
Corporate Management Team (CMT) and approved by the Audit and Scrutiny Panel in
September 2021.   
2.12 A subsequent Internal Audit on Corporate Governance in March 2022 cited the
assessment process now in place through the Strategic Governance Framework and
its accompanying Review Programme as good practice.  It was also cited that there are
now “formal and robust arrangements” in place to ensure that such reviews are
undertaken on an annual basis.   
Current position 
2.13 The latest update to the Strategic Governance Framework and its accompanying
Review Programme was further endorsed by the CMT in June 2022 as the council’s
local code of governance which has undergone an annual review and refresh process
in order to identify how the effectiveness of the council’s governance arrangements
have been monitored and evaluated in the year.  The updated Framework was
subsequently approved by the Audit and Scrutiny Panel in September 2022. 
2.14 Using a RAG status, each of the elements and mechanisms within the Review 
Programme can be assessed to ensure they remain timely and effective in 
supporting delivery of The Plan for North Lanarkshire.  This process provides a method
by which to identify and prioritise items requiring to be reviewed and updated further.

Page 5

The latest position as at June 2022 identified no Red elements or mechanisms, three
Amber, and the rest were Green.  For all three assessed as Amber (i.e. Corporate Anti-
Fraud Policy and Response Plan, Code of Conduct for Chief Officers, and the
Employee Performance Review and Development (PRD)), there is a commitment by a
member of the CMT to ensure an update is undertaken during 2022/23. 
Next steps 
2.15 The natural alignment of the elements and mechanisms in the Strategic Governance
Framework means there has been, in some instances, overlap with the governance
and strategic oversight and accountability aspects from the Programme of Work for
2022/23.  CMT therefore acknowledged (in June 2022) the integration of these items
into the one framework moving forward, in line with the outputs from their Strategic
Planning session in April 2022.   
2.16 Specific items from the Programme of Work from 2022/23 were therefore incorporated
into the Strategic Governance Framework Review Programme in June 2022 (i.e.
P007.1-Corporate communications plan; P011-Three year revenue budget strategy,
P012.1-Community Investment Fund; P059-Procurement capacity and capability,
P072.2-Strategic data management and information governance; P075.1-Strategic
governance, oversight, and accountability; P086-Equalities, and P087.1-Climate
change duty compliance). 
2.17 Moving forward, the Strategic Governance Framework and its accompanying Review
Programme will remain on a formal annual review process that will take place each
year in order to inform production of the council’s Annual Governance Statement.  This
review will include updating on the reporting arrangements for the former Programme
of Work governance items. 
3. Strategic Performance Framework 
Background 
2.18 The detailed Strategic Performance Framework, approved in
September 2019, sets out the framework for performance
measurement at three levels (as per the diagram on the right). 
This approach aims to collectively provide an overview of
performance to help understand the impact of council activities on
improving services and outcomes for the people and communities
of North Lanarkshire.  The measures in this Framework allow for
day to day activities, and progress towards achieving the long-term vision set out in
The Plan for North Lanarkshire, to be regularly monitored, reported, assessed, and
scrutinised. 
2.19 Ensuring compliance with the requirements of Best Value, good governance, and the
Accounts Commission’s Statutory Direction were three aspects which shaped the
development of the Strategic Performance Framework.  As such, the three levels of
indicators within the Framework align to Statutory Performance Indicator 1 in the
Direction in respect of “improving local services” (level 3) and “improving local
outcomes” (levels 1 and 2)”.  The non-negotiable standards supporting the Framework 
are designed to reflect key requisites of the Direction, such as ensuring performance
reporting that is balanced and in context. 
Current position

Page 6

2.20 As recognised in the Annual Governance Statement for 2021/22 (signed off by the CMT
in June 2022 and approved by the Audit and Scrutiny Panel in September 2022), the
Internal Audit annual audit opinion for 2021/22 recognised that “implementation of
effective, timely, and regular performance reporting on key strategic and operational
performance measures to the Corporate Management Team and Service Committees
has been significantly impacted over the last two years due to the need to respond to,
and prioritise resources as a result of, the pandemic”. 
2.21 Notwithstanding this impact, work has progressed and this is recognised by Audit
Scotland in their Annual Audit Report for 2021/22 (due to be presented to the Audit and
Scrutiny Panel in November 2022).  This reports on the implementation of the BVAR
recommendation (i.e. to “implement the recently approved Performance Management
Framework and reporting schedule to support the delivery of The Plan for North
Lanarkshire and its scrutiny my members”) and concludes that “good progress has
been made”.  
2.22 Activities undertaken during 2022 in this respect therefore include the following. 
• An update to the level 1 health check indicators was reported to the Policy and
Strategy Committee in March 2022.  Collectively these indicators provide the North
Lanarkshire context and have an important role to play in terms of informing the
council’s strategic planning process and providing a way of assessing progress
against the long-term vision.  A further six monthly update was produced in August
2022 which is currently being used to inform the further development of the
Programme of Work for 2023 onwards. 
• Local Government Benchmarking Framework (LGBF) reporting to the Audit and
Scrutiny Panel was aligned to the five priorities within The Plan for North
Lanarkshire.  This enabled due consideration of council performance - along with
comparable performance results from other councils over a considerable period of
time - within the context of the council’s strategic plan.  
• The council’s website hosts the national online LGBF tool to enable easy access
for the public to view the suite of benchmarking measures and compare North
Lanarkshire’s results with other local authorities (https://www.northlanarkshire.gov.uk/your-
council/performance-of-the-council/comparing-our-performance). The Audit Scotland 2020/21
Annual Audit Report therefore concluded that the BVAR recommendation to
ensure that “performance information on the council’s website should be kept up
to date to improve accountability to the public” was complete.
• A new approach to performance reporting for complaints indicators (in line with the
Scottish Public Services Ombudsman (SPSO) Local Authority Complaints
Handling Procedure) was built up within the Business Intelligence (BI) Hub in line
with the move to the new Dynamics platform for handling complaints.  This provides
a range of data visuals which enable live complaints performance information to
be viewed, segmented, and analysed in order to identify aspects of complaints
handling which require further investigation.  This supports the move away from
performance reporting to actively using performance information to identify areas
for improvement.
• Strategic Performance Framework pilot reporting was tested during 2021 and 2022
that aimed to reaffirm the related responsibilities of service committee and set out
the latest performance results to allow Elected Members to monitor, assess, and
scrutinise performance in order to identify areas requiring improvement and inform
future decision making.  This also aimed to ensure performance reporting
remained effective in achieving the best fit between reporting on progress against
the council’s long-term vision and delivering on what matters today locally.  The
pilots reported the latest performance results for the:
- Head of Regulatory Services and Waste Solutions to the Environment and

Page 7

Transportation Committee  in August 2021 and February 2022. 
- Head of Business and Digital to the Transformation and Digitisation Committee  
in September 2021 and February 2022.
- Head of Financial Solutions to the Finance and Resources Committee in
September 2021 and March 2022.
- Head of Environmental Assets to the Environment and Transportation
Committee in February 2022. 
2.23 Following positive feedback from Committees and Heads of Service regarding the pilot,
the opportunity was taken (while there was no committee meetings from April to August
2022) to establish the same reporting mechanism for all other Head of Service areas. 
This has involved establishing a bank of data spreadsheets with all relevant indicators
and updated data, updating indicator definitions, and ensuring accuracy checks are in
place.   
2.24 It should be noted that this has been a substantial piece of work given the size of the
council and extent of service provision in operation, the availability of performance
information and resources in services to maintain such information while dealing with
the pandemic, not to mention that this work was ongoing at the same time as it was
being audited by both internal and external auditors, thus impacting on the same
resource.  This work was also ongoing at a time when work was being carried out
simultaneously to set up the Strategic Performance Framework in the Business
Intelligence (BI) Hub to improve not only the presentation of performance information
in the future, but also the ability to more effectively analyse the information in order to
identify areas for improvement. 
Next steps 
2.25 Work to progress the next steps in order to fully re-implement the Strategic 
Performance Framework in 2022/23 has been ongoing during 2022.  Current work 
therefore includes: 
• Finalisation of work already underway to complete the Head of Service data
spreadsheets and the corresponding Teams landing page for launch with the CMT
in November 2022.  
• These spreadsheets - and the suite of LGBF indicators (which are integrated within
the spreadsheets) - will inform a future programme of themed discussions and
challenge and scrutiny agenda items for both the CMT and the Audit and Scrutiny
Panel.
• CMT meetings will also see each Head of Service (a) present service performance
highlights in line with risks, and (b) identify the public performance reporting to
follow thereafter.
• Finalisation of work already underway with Heads of Service to review indicators
within the Strategic Performance Framework and identify those that are to remain
moving forward.  This has included a review and update of the corresponding
targets and thresholds for the next three years.
• Finalisation of work already underway to update the triennial Strategic
Performance Framework document itself to ensure it remains effective in
assessing performance and progress in terms of the delivery of The Plan for North
Lanarkshire. This will incorporate changes to the levels of performance measures
therein following the review.
• Finalisation of work already underway to update the Strategic Performance
Framework Annual Reporting Schedule which aims to set out arrangements for
regular reporting to Service Committees and the Audit and Scrutiny Panel in
respect of (a) the Strategic Performance Framework, (b) service specific

Page 8

requirements and statutory obligations, and (c) the range of programmes and
projects identified through the refreshed Project Management Framework and
associated Project Register. 
• Development of a public performance reporting framework framed within the
context of what The Plan for North Lanarkshire aims to achieve and what
performance in this respect means locally. 
4.  Strategic Self-Evaluation Framework 
Background 
2.26 Initially approved in 2018, the Strategic Self-Evaluation Framework asks the questions
How well are we doing? How do we know? and How can we do better? to ensure the
council has a way of regularly assessing practices, recognising strengths, and
identifying areas for improvement. 
2.27 This supports the council’s Best Value duty that aims to secure continuous
improvement in performance.  Being self-aware and undertaking a structured
programme of self-evaluation underpins the duty to secure continuous improvement,
and good practice suggests local authorities adopt a single strategy for improvement
when implementing self-evaluation. 
2.28 A single strategy for improvement is in place through the Strategic Self-Evaluation
Framework and rolling Review Programme, which was endorsed by the CMT in July
2021 and approved by the Audit and Scrutiny Panel in September 2021.   
Current position 
2.29 A dedicated page on the council’s website provides a central location for reporting on
findings and recommendations from all national audits and inspections:  
(https://www.northlanarkshire.gov.uk/your-council/performance-of-the-council/best-value). 
2.30 The accompanying report on the Audit and Scrutiny Panel agenda today (Annual
review and refresh of the Strategic Self-Evaluation Framework) updates the Panel on
the achievements from the Strategic Self-Evaluation Framework rolling Review
Programme for 2021 to 2022 and presents the refreshed Framework.  As a mechanism
that also helps the council to provide assurances that services provided represent value
for money, are efficient and effective, and able to demonstrate Best Value, a corporate
approach to Options Appraisal has also been included in the Framework. 
2.31  The council’s commitment to self-evaluation and implementing the recommendation
from the 2019 Best Value Assurance Report (BVAR) - i.e. improvement plans arising
from self-evaluation exercises should include measurable actions and clear deadlines
- is recognised by Audit Scotland in their Annual Audit Report for 2021/22 (due to be
presented to the Audit and Scrutiny Panel in November 2022).  This external
assessment concludes that this BVAR recommendation is now considered complete. 
Next steps 
2.32 The accompanying report on the Audit and Scrutiny Panel agenda today sets out the
rolling Review Programme for 2022 to 2023 to ensure the council continues to ensure
a mechanism is in place to assess the council’s functions and activities and identify
areas for improvement within the context of fulfilling the vision set out in The Plan for
North Lanarkshire.

Page 9

2.33 As the Panel will recall, the council was in year three of the six-year national Best Value
Assurance Report (BVAR) review programme which concluded with publication of a
positive report for North Lanarkshire in May 2019.  A new national approach to auditing
Best Value now comes into effect (for 2022/23 onwards) which will not see a repeat of
the BVAR process for all councils, rather the focus moves to the integration of auditing
Best Value within each individual council’s external auditors Annual Audit Report (AAR)
process.   
2.34 This means that the council will, in effect, undergo an annual assessment in terms of
particular aspects of Best Value.  As such, and considering that the North Lanarkshire
BVAR is over three years old (and pre-dates the pandemic) it is important to ensure the
council continues to be able to demonstrate Best Value and evidence this in practice. 
It is therefore the intent of the CMT that a self-evaluation will be undertaken that is in
essence a Best Value follow up.  This is incorporated into the Strategic Self-Evaluation
Framework rolling Review Programme for 2022 to 2023 and an update in this respect
will be reported to a future meeting of the Audit and Scrutiny Panel.   
5. Project Management Framework 
Background 
2.35 The council’s corporate Project Management Model was launched in April 2018 to
enable each stage of delivery towards achieving the overall objectives of a project to
be planned, guided, and implemented through a systematic and consistent approach. 
2.36 The annual position statement reported to the Audit and Scrutiny Panel in September
2021 advised that a review of the Model was underway; this review followed
recommendations arising from Internal Audit reports - on the governance of capital
projects and managing strategic change - which both reported a reasonable assurance
(green-amber) audit opinion, but considered further action was required and/or there
was scope for improvement in five specific areas. 
2.37 The review and refresh exercise was also considered necessary in light of the changes
in the council’s operating environment since the implementation of the Model in 2018. 
These changes have led to a rapid evolution of programmes and projects across the
council, as well as increasing complexities in the delivery of many of these, and a
growing need for good governance and good project management to set up and deliver
a wider range of projects at pace and scale, and ensure these are well-directed,
delivered to time, cost, and quality targets, and provide the expected benefits and
improved local outcomes. 
2.38 The Review Group set up to review and update the Model benefitted from the expertise
of a wide range of officers from across the council with practical on the ground
experience of project management in both construction and non-construction projects. 
2.39 Following work to collate and analyse the information collected through the review, five
themes on areas for improvement consistently emerged, as noted below.   
1. Redevelopment of the Framework itself to provide clear step by step guidance for
employees on how projects should be planned, managed, and monitored
(whether they are experienced or new to the discipline of project management).
2. Identification of mandatory tasks for particular stages in the project life cycle
which the Senior Responsible Officer (SRO) and Project Manager must ensure
are adhered to.  
3. Making it easier for employees to understand their own role and responsibilities if

Page 10

they are assigned to a Project Team, as well as the roles and responsibilities of
all Team members.  
4. An ongoing programme of training, staff learning and development, and
awareness raising in line with the refreshed Project Management Framework.
5. Enhanced opportunities for more collaboration, sharing, and learning. 
Current position 
2.40 Following the conclusion of the review, and further work to develop and implement the
identified improvement actions, the consultative draft of the refreshed corporate Project
Management Framework (2022) was approved by the CMT on 27th September 2022. 
2.41 Subsequent engagement has since concluded with the council’s Operational
Management Team (OMT) and Organisational Design Authority (ODA) to ensure
appropriate feedback from a wider more operationally focussed audience. 
2.42 An engagement and communication programme is currently underway across all
Services in order to raise awareness of the refreshed Project Management Framework,
highlight the key differences and mandatory aspects therein, and ensure appropriate
consistency of approach in terms of implementation.  More importantly, this also aims
to help those affected by the change to transition seamlessly to the refreshed
Framework and use it - not as a tick box exercise - but to add value and effective
support to the everyday tasks involved in developing, managing, and delivering
projects. 
2.43 In addition, work is also underway with Heads of Service to establish a Project Register
for strategic oversight purposes. When established, this Register will (a) assist with the
appropriate implementation of the refreshed Project Management Framework, (b)
serve as a mechanism to provide evidence in respect of the council’s governance
arrangements, and (c) inform a regular review programme by which projects will be
assessed for quality assurance purposes and for appropriate compliance with the
refreshed Project Management Framework. 
Next steps 
2.44 It is recognised that the refreshed Project Management Framework contains a 
significant volume of information that relevant staff will require to become familiar with 
and apply.  As such, the supporting training and learning and development programme
was considered important in terms of the rollout and implementation process.  A similar
rollout to that which occurred in 2018 is therefore being applied, in that training will be
ongoing over a period of time to ensure all relevant members of staff, senior
management, and Elected Members can be brought up to date.  A Frequently Asked
Questions (FAQs) document has also been developed to support this rollout.  A pilot of
the new face to face training approach will be trialled in December 2022, with full roll
out across the council (as appropriate) scheduled to begin in January 2023.   
2.45 Ongoing support thereafter will be available through a range of online materials,
refresher courses, and a Yammer Forum.  Through these mechanisms there will also
be an opportunity to share lessons learned and provide feedback on the practical
application of the refreshed Framework which will inform the ongoing annual lite touch
review process to ensure it remains fit for purpose. 
2.46 As noted in Appendix B in the Strategic Self-Evaluation Framework rolling Review
Programme, a self-evaluation is scheduled to be undertaken in 2023 on the
effectiveness of Project Boards / Groups as a follow on from the 2022 refresh to the

Page 11

Project Management Framework. 
6. Framework for Demonstrating Improved Outcomes for Communities 
Background 
2.47 As the public spending watchdog for local government in Scotland, the Accounts
Commission aim to ensure their work (a) helps provide assurance to the public on the
performance of each Scottish council and (b) reflects councils’ responsibilities to deliver
high quality services to the public.   
2.48 These assurances are provided through a range of audit activity that is set out in the
Commission’s programme of work; this includes setting a Statutory Direction that
directs local authorities on the publication of performance information relating to their
activities that allows for comparisons over time and with other local authorities. 
2.49 In operation since implementation of the Local Government Act 1992, the Statutory
Direction has more recently been reviewed and refreshed every three years.  The
recent update to the Statutory Direction in November 2021 (covering reporting for the
three financial years from 2022/23 to 2024/25) emphasised a focus on providing a
descriptive (rather than prescriptive) approach, with specific revisions centred on a
number of key areas which included community engagement and empowerment.   
2.50 In this respect, the emphasis is on evidencing that the council is carrying out community
planning for the “improvement in the achievement of outcomes”.  In addition, the
Accounts Commission expects councils (in agreeing outcomes with partners and
communities) to report on how they have engaged with, responded to and helped to
empower their communities, including those who require greater support. 
Current position 
2.51 In line with the re-emphasised focus in the Statutory Direction set out in paragraph 2.50
above, a sixth Framework (Demonstrating Improved Outcomes for Communities) was
established to ensure the evidence is in place to formally fulfil this aspect. 
2.52 Approved by the North Lanarkshire Partnership Strategic Leadership Board in June 
2022, the Framework for Demonstrating Improved Outcomes for Communities sets out
the model which the North Lanarkshire Partnership will use to assess progress and
performance in terms of delivering upon the priorities and plans and ensuring that
partnership activities can demonstrate improved outcomes that make a real difference
for local people and local communities.  The Framework also includes a number of
case studies to highlight just some of the improved outcomes in local communities.     
Next steps 
2.53 The Framework for Demonstrating Improved Outcomes for Communities is on the
review programme to undergo a regular review and refresh exercise.   
3. Measures of success 
3.1 Regular scrutiny to ensure good governance principles are met and enable the council
to pursue its ambition effectively, while underpinning this with controls and the
management of risk. 
3.2 Regular strategic oversight and scrutiny to ensure resources are directed in accordance

Page 12

with agreed policy and according to priorities, while ensuring sound decision making
and clear accountability for the use of resources in achieving improved outcomes for
service users and the local community.   
4. Supporting documentation 
4.1 None 
Katrina Hassell
Head of Business and Digital 
5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☒ No ☐
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☒ No ☐

Page 13

If Yes, please provide a brief summary of the impact?
The Local Government in Scotland Act 2003 introduced the duty of Best Value; this
requires that councils “make arrangements to secure continuous improvement in
performance”.  
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed?
Work to ensure an annual review and refresh programme for the set of inter-
connected corporate frameworks ensures the council continues to support the Best
Value duty and comply with the principles set out within the Delivering Good
Governance in Local Government: Framework (2016).  This contributes towards the
mitigation of the risks on the Corporate Risk Register for (a) Governance,
Leadership, and Decision Making and (b) Managing Strategic Change.