Agenda pack

North Lanarkshire Council · 27 October 2022
Back to Audit and Scrutiny Panel — 27 October 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Our Ref:
Your Ref:
Contact:
Tel:
Fax:
E-Mail:
Date: 
Lesley Dysart 
dysartl@northlan.gov.uk
18 Oct 2022 
Members of the
Audit and Scrutiny Panel     
Chief Executive’s Office
Archie Aitken
Head of Legal & Democratic 
Solutions
Civic Centre, Windmillhill Street
Motherwell ML1 1AB
DX 571701, Motherwell 2
www.northlanarkshire.gov.uk      
Notice is given that a Special Meeting of the AUDIT AND SCRUTINY PANEL is to be held in 
Committee Room 1, Civic Centre, Motherwell  on Thursday, 27 October 2022 at 2pm which you are
requested to attend. 
The agenda of business is attached.    
Head of Legal and Democratic Solutions 
Members :     Councillors: H Dunbar, J Hume, D Johnston, T Johnston, T Fisher, H Loughran,
F McNally, G Robinson, K Stevenson, R Sullivan and S Watson. 
Page 1 of 209

Page 2

Page 2 of 209

Page 3

AGENDA
(1) Declarations of Interest in terms of the Ethical Standards in Public Life Etc. (Scotland) Act
2000
2021-22 - EXTERNAL AUDIT RELATED ITEMS
(2) Annual Accounts 2021-22 - Letters of Representation (page 5 - 8)
Submit report by the Head of Financial Solutions providing the Panel with information on the
Letter of Representation required to be submitted to Audit Scotland in respect of the Council's
Annual Accounts and the Council's Charitable Trust Accounts for 2021/22 (copy herewith)
**Please Note that the Appendices to this Report appear at Pages 19 -22 and 31-33 of this
Agenda Pack** (copy herewith) 
(3) Annual Accounts 2021-22 External Auditor's Report to Those Charged with Governance
(page 9 - 34)
Submit report by the Head of Financial Solutions to allow the Panel to consider the external
auditor's comments on specific matters arising from their audit of the financial statements for
both the Council and the Charitable Trusts and Educational Endowments administered by the
Council (copy herewith)
(4) External Audit - Annual Audit Report 2021-22 (page 35 - 74)
Submit report by the Head of Audit and Risk presenting to the Panel the Annual Audit Report
produced by the Council's appointed external auditors, Audit Scotland, in respect of the audit
of the Council for the year-ending 31 March 22 (copy herewith)
(5) Annual Accounts 2021/22 (Audited) (page 75 - 209)
Submit report by the Head of Financial Solutions (1) presenting the Council's final 2021/22
Annual Accounts, and (2) providing the Panel with the background on the need to consider
matters raised by Audit Scotland in respect of their examination of the accounts (copy
herewith)
Page 3 of 209

Page 4

Page 4 of 209

Page 5

North Lanarkshire Council
Report
Audit & Scrutiny Panel 
Does this report require to be approved? ☐ Yes   ☒ No
Ref;EK/KS/VR   Date 27/10/22 
Annual Accounts 2021/22 – Letters of Representation 
From  Elaine Kemp, Head of Financial Solutions  
E-mail KempE@northlan.gov.uk Telephone
07939280601 
1. Background 
1.1.  The Local Government (Scotland) Act 1973 requires all local authorities to appoint an
officer who has responsibility for the administration of their financial affairs, known as
the Section 95 Officer.
1.2. International Standards on Auditing (ISA580 Written Representations) require
external audit to request a written representation from the accountable officer
providing written assurance on aspects of the Council’s financial statements, and
Charitable Trust and Educational Trust Accounts, including the judgements and
estimates made in their preparation. 
Executive Summary 
The purpose of this report is to provide Members with information on the Letter of
Representation required to be submitted to Audit Scotland in respect of the Council’s
Annual Accounts and the Council’s Charitable Trust Accounts for 2021/22. 
Recommendations
The panel is invited to note the Letters of Representation provided to Audit Scotland 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
AGENDA ITEM 2
Page 5 of 209

Page 6

2.       Report 
2.1. The letters of representation have been signed in my capacity as Section 95 Officer
for the Council and Trustee for the Charitable Trust and Educational Trust.  A copy of
both letters are attached.
2.2. As in previous years, the letters set out the representations of management and
confirms that the accounts are free from material misstatement.
2.3. During the course of the audit, the external auditors have highlighted a number of
misstatements within the Council’s financial statements, which where material, have
been adjusted for the audited accounts.
2.4. A list of items that have arisen relating to the Council’s accounts and the Charitable
Trust and Educational Trust accounts are contained within the External Audit Annual
Audit Report, which forms part of this meeting’s agenda.  
3.  Measures of success 
N/a 
4. Supporting documents
Appendix 1 North Lanarkshire Council Letter of Representation
Appendix 2 Charitable Trusts and Educational Endowments Letter of Representation 
Elaine Kemp
Head of Financial Solutions 
5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
Page 6 of 209

Page 7

If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact
Is there a risk impact?
Yes ☐ No ☒
Page 7 of 209

Page 8

If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
Page 8 of 209

Page 9

North Lanarkshire Council
Report
Audit & Scrutiny Panel 
Does this report require to be approved? ☐ Yes   ☒ No
Ref;EK/KS/VR   Date 27/10/22 
Annual Accounts 2021/22 – External Auditor’s report to those
charged with Governance on the 2021/22 Audit 
From  Elaine Kemp, Head of Financial Solutions  
E-mail KempE@northlan.gov.uk Telephone
07939280601 
1. Background
1.1. The Audit Commission appoint external auditors to local authorities in order to carry
out the audit of financial statements in accordance with International Standards on
Auditing.
1.2. Recognising the importance of effective two-way communication in an audit of
financial statements, the International Standards on Auditing (ISA260 Communication
with those charged with governance) requires external auditors to communicate
relevant matters relating to their audit of financial statements to those charged with
governance. Such communications are required to be on a sufficiently prompt basis
to enable those charged with governance to take appropriate action.
1.3. The objectives of the auditors are to:
• Communicate clearly with those charged with governance the responsibilities
of the auditor in relation to the financial statement audit and the scope and
timing of the audit;
Executive Summary
This report is presented to members to allow them to consider the external auditor’s
comments on specific matters arising from their audit of the financial statements for both
the Council and the Charitable Trusts and Educational Endowments administered by the
Council.
Recommendations
It is recommended that the panel invite the external auditor to speak to their report and
consider, as appropriate, the issues highlighted. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
AGENDA ITEM 3
Page 9 of 209

Page 10

• Obtain from those charged with governance, information relevant to the audit;
• Provide those charged with governance with timely observations arising from
the audit that are relevant to their responsibility to oversee the financial
reporting process. This may include:
a) Significant difficulties, if any, encountered during the audit;
b) Material weaknesses, if any, in the design, implementation or
operating effectiveness of financial systems relating to the accounts;
c) Any unadjusted misstatements;
d) Their views on the qualitative aspects of the Council’s accounting and
financial reporting practices;
e) Any unexpected modifications to the auditor’s report on the accounts; 
f) Any other relevant matters relating to the audit.
• Promote effective two-way communication between the auditor and those
charged with governance. 
2. Report
2.1. The review of the 2021/22 accounts by Audit Scotland is now complete with the final
version of the accounts forming part of this meeting’s agenda.
2.2. Following completion of their audit, Audit Scotland have produced reports to those
charged with governance on the 2021/22 Audit for both North Lanarkshire Council,
and North Lanarkshire Council Charitable Trust and Educational Endowments, copies
of which are attached to this report.
2.3. A full Annual Report has been prepared by Audit Scotland and forms part of this
meeting’s agenda. 
3. Measures of success
N/a 
4. Supporting documents
Appendix 1 Audit Scotland Report to Those Charged With Governance on the 2021/22
Audit – North Lanarkshire Council
Appendix 2 Audit Scotland Report to Those Charged With Governance on the 2021/22
Audit – North Lanarkshire Council Charitable Trust and Educational
Endowments 
Elaine Kemp
Head of Financial Solutions 
5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
Page 10 of 209

Page 11

If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
Page 11 of 209

Page 12

5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact
Is there a risk impact?
Yes ☐ No ☒
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
Page 12 of 209

Page 13

102 West Port
Edinburgh 
EH3 9DN
8 Nelson Mandela Place
Glasgow 
G2 1BT
The Green House
Beechwood Business Park North
Inverness
IV2 3BL
T: 0131 625 1500
E: info@audit-scotland.gov.uk
www.audit-scotland.gov.uk 
Audit and Scrutiny Panel 
27 October 2022
North Lanarkshire Council
Audit of 2021/22 annual accounts 
Independent auditor's report
1.  Our audit work on the 2021/22 annual accounts is now substantially complete. Subject to the
satisfactory conclusion of the outstanding matters referred to later in this letter and receipt of a
revised set of annual accounts for final review, we anticipate being able to issue unqualified
audit opinions in the independent auditor's report on 27 October 2022 (the proposed report is
attached at Appendix A).  
Annual audit report
2.  Under International Standards on Auditing in the UK, we report specific matters arising from
the audit of the financial statements to those charged with governance of a body in sufficient
time to enable appropriate action. We present for the Audit and Scrutiny Panel’s consideration
our draft annual report on the 2021/22 audit. The section headed "Significant findings from the
audit in accordance with ISA 260" sets out the issues identified in respect of the annual
accounts.
3.  The report also sets out conclusions from our consideration of the four audit dimensions that
frame the wider scope of public audit as set out in the Code of Audit Practice.
4.  This report will be issued in final form after the annual accounts have been certified.
Unadjusted misstatements
5.  We also report to those charged with governance all unadjusted misstatements which we
have identified during our audit, other than those of a trivial nature and request that these
misstatements be corrected.
6.  We have no unadjusted misstatements to be corrected.
Fraud, subsequent events and compliance with laws and regulations
7.  In presenting this report to the Audit and Scrutiny Panel we seek confirmation from those
charged with governance of any instances of any actual, suspected or alleged fraud; any
subsequent events that have occurred since the date of the financial statements; or material
non-compliance with laws and regulations affecting the entity that should be brought to our
attention.
Page 13 of 209

Page 14

Representations from Section 95 Officer
8.  As part of the completion of our audit, we are seeking written representations from the
Section 95 Officer on aspects of the annual accounts, including the judgements and estimates
made.
9.  A draft letter of representation is attached at Appendix B. This should be signed and
returned to us by the Section 95 Officer with the signed annual accounts prior to the
independent auditor’s report being certified. 
Outstanding matters 
10.  There is one area where we still require additional information and that is assurances for the
Group from component auditors of Strathclyde Partnership Travel. 
Page 14 of 209

Page 15

Appendix A:  Proposed Independent Auditor’s Report
Independent auditor’s report to the members of North
Lanarkshire Council and the Accounts Commission
Reporting on the audit of the financial statements 
Opinion on financial statements
I certify that I have audited the financial statements in the annual accounts of North Lanarkshire
Council and its group for the year ended 31 March 2022 under Part VII of the Local Government
(Scotland) Act 1973. The financial statements comprise the council-only and group
Comprehensive Income and Expenditure Statements, Balance Sheets, Movement in Reserves
Statements, and Cash Flow Statements, the council-only Housing Revenue Account, Council
Tax Income Statement, the Non Domestic Rates Income Statement, the Sundry Accounts
Statement, and notes to the financial statements, including significant accounting policies. The
financial reporting framework that has been applied in their preparation is applicable law and UK
adopted international accounting standards, as interpreted and adapted by the Code of Practice
on Local Authority Accounting in the United Kingdom 2021/22 (the 2021/22 Code).
In my opinion the accompanying financial statements:
• give a true and fair view in accordance with applicable law and the
2021/22 Code of the state of affairs of the council and its group as at 31
March 2022 and of the income and expenditure of the council and its
group for the year then ended;
• have been properly prepared in accordance with UK adopted
international accounting standards, as interpreted and adapted by the
2021/22 Code; and
• have been prepared in accordance with the requirements of the Local
Government (Scotland) Act 1973, The Local Authority Accounts
(Scotland) Regulations 2014, and the Local Government in Scotland
Act 2003. 
Basis for opinion
I conducted my audit in accordance with applicable law and International Standards on Auditing
(UK) (ISAs (UK)), as required by the Code of Audit Practice approved by the Accounts
Commission for Scotland. My responsibilities under those standards are further described in the
auditor’s responsibilities for the audit of the financial statements section of my report. I was
appointed under arrangements approved by the Accounts Commission on 10 April 2017. The
period of total uninterrupted appointment is six years. I am independent of the council and its
group in accordance with the ethical requirements that are relevant to my audit of the financial
statements in the UK including the Financial Reporting Council’s Ethical Standard, and I have
fulfilled my other ethical responsibilities in accordance with these requirements. Non-audit
services prohibited by the Ethical Standard were not provided to the council. I believe that the
audit evidence I have obtained is sufficient and appropriate to provide a basis for my opinion.
Conclusions relating to going concern basis of accounting
I have concluded that the use of the going concern basis of accounting in the preparation of the
financial statements is appropriate.
Page 15 of 209

Page 16

Based on the work I have performed, I have not identified any material uncertainties relating to
events or conditions that, individually or collectively, may cast significant doubt on the ability of
the council and its group to continue to adopt the going concern basis of accounting for a period
of at least twelve months from when the financial statements are authorised for issue.
These conclusions are not intended to, nor do they, provide assurance on the current or future
financial sustainability of the council and its group. However, I report on the council’s
arrangements for financial sustainability in a separate Annual Audit Report available from the
Audit Scotland website.
Risks of material misstatement
I report in my Annual Audit Report the most significant assessed risks of material misstatement
that I identified and my judgements thereon.
Responsibilities of the Head of Financial Solutions and Audit and Scrutiny Panel for the
financial statements
As explained more fully in the Statement of Responsibilities, the Head of Financial Solutions is
responsible for the preparation of financial statements that give a true and fair view in
accordance with the financial reporting framework, and for such internal control as the Head of
Financial Solutions determines is necessary to enable the preparation of financial statements
that are free from material misstatement, whether due to fraud or error.
In preparing the financial statements, the Head of Financial Solutions is responsible for
assessing the ability of the council and its group to continue as a going concern, disclosing, as
applicable, matters related to going concern and using the going concern basis of accounting
unless there is an intention to discontinue the operations of the council and its group.
The Audit and Scrutiny Panel is responsible for overseeing the financial reporting process.
Auditor’s responsibilities for the audit of the financial statements
My objectives are to obtain reasonable assurance about whether the financial statements as a
whole are free from material misstatement, whether due to fraud or error, and to issue an
auditor’s report that includes my opinion. Reasonable assurance is a high level of assurance,
but is not a guarantee that an audit conducted in accordance with ISAs (UK) will always detect a
material misstatement when it exists. Misstatements can arise from fraud or error and are
considered material if, individually or in the aggregate, they could reasonably be expected to
influence the decisions of users taken on the basis of these financial statements.
Irregularities, including fraud, are instances of non-compliance with laws and regulations. I
design procedures in line with my responsibilities outlined above to detect material
misstatements in respect of irregularities, including fraud. Procedures include:
• obtaining an understanding of the applicable legal and regulatory
framework and how the council and its group is complying with that
framework;
• identifying which laws and regulations are significant in the context of
the council and its group;
• assessing the susceptibility of the financial statements to material
misstatement, including how fraud might occur; and
Page 16 of 209

Page 17

• considering whether the audit team collectively has the appropriate
competence and capabilities to identify or recognise non-compliance
with laws and regulations.
The extent to which my procedures are capable of detecting irregularities, including fraud, is
affected by the inherent difficulty in detecting irregularities, the effectiveness of the council’s
controls, and the nature, timing and extent of the audit procedures performed.
Irregularities that result from fraud are inherently more difficult to detect than irregularities that
result from error as fraud may involve collusion, intentional omissions, misrepresentations, or
the override of internal control. The capability of the audit to detect fraud and other irregularities
depends on factors such as the skilfulness of the perpetrator, the frequency and extent of
manipulation, the degree of collusion involved, the relative size of individual amounts
manipulated, and the seniority of those individuals involved.
A further description of the auditor’s responsibilities for the audit of the financial statements is
located on the Financial Reporting Council's website www.frc.org.uk/auditorsresponsibilities.
This description forms part of my auditor’s report.
Reporting on other requirements
Opinion prescribed by the Accounts Commission on the audited part of the
Remuneration Report
I have audited the part of the Remuneration Report described as audited. In my opinion, the
audited part of the Remuneration Report has been properly prepared in accordance with The
Local Authority Accounts (Scotland) Regulations 2014.
Other information 
The Head of Financial Solutions is responsible for other information in the annual accounts. The
other information comprises the Management Commentary, Annual Governance Statement,
Statement of Responsibilities and the unaudited part of the Remuneration Report. 
My responsibility is to read all the other information and, in doing so, consider whether the other
information is materially inconsistent with the financial statements or my knowledge obtained in
the course of the audit or otherwise appears to be materially misstated. If I identify such material
inconsistencies or apparent material misstatements, I am required to determine whether this
gives rise to a material misstatement in the financial statements themselves. If, based on the
work I have performed, I conclude that there is a material misstatement of this other information,
I am required to report that fact. I have nothing to report in this regard.
My opinion on the financial statements does not cover the other information and I do not
express any form of assurance conclusion thereon except on the Management Commentary
and Annual Governance Statement to the extent explicitly stated in the following opinions
prescribed by the Accounts Commission.
Opinions prescribed by the Accounts Commission on the Management Commentary and
Annual Governance Statement
In my opinion, based on the work undertaken in the course of the audit:
• the information given in the Management Commentary for the financial
year for which the financial statements are prepared is consistent with
the financial statements and that report has been prepared in
Page 17 of 209

Page 18

accordance with statutory guidance issued under the Local Government
in Scotland Act 2003; and
• the information given in the Annual Governance Statement for the
financial year for which the financial statements are prepared is
consistent with the financial statements and that report has been
prepared in accordance with the Delivering Good Governance in Local
Government: Framework (2016).
Matters on which I am required to report by exception
I am required by the Accounts Commission to report to you if, in my opinion:
• adequate accounting records have not been kept; or
• the financial statements and the audited part of the Remuneration
Report are not in agreement with the accounting records; or
• I have not received all the information and explanations I require for my
audit; or
• there has been a failure to achieve a prescribed financial objective.
I have nothing to report in respect of these matters.
Conclusions on wider scope responsibilities
In addition to my responsibilities for the annual accounts, my conclusions on the wider scope
responsibilities specified in the Code of Audit Practice, including those in respect of Best Value,
are set out in my Annual Audit Report.
Use of my report
This report is made solely to the parties to whom it is addressed in accordance with Part VII of
the Local Government (Scotland) Act 1973 and for no other purpose. In accordance with
paragraph 120 of the Code of Audit Practice, I do not undertake to have responsibilities to
members or officers, in their individual capacities, or to third parties. 
Brian Howarth ACMA CGMA,
Audit Scotland,
8 Nelson Mandela Place,
Glasgow,
G2 1BT,
27 October 2022 
Page 18 of 209

Page 19

Appendix B:  Letter of Representation (ISA 580)
Brian Howarth, Audit Director
Audit Scotland
8 Nelson Mandela Place
Glasgow
G2 1BT 
Dear Brian 
North Lanarkshire Council
Annual Accounts 2021/22
1.  This representation letter is provided about your audit of the annual accounts of North
Lanarkshire Council for the year ended 31 March 2022 for the purpose of expressing an opinion
as to whether the financial statements give a true and fair view in accordance with the financial
reporting framework, and for expressing other opinions on the remuneration report,
management commentary and annual governance statement.
2.  I confirm to the best of my knowledge and belief and having made appropriate enquiries of
the Chief Executive and Corporate Management Team, the following representations given to
you in connection with your audit of North Lanarkshire Council’s annual accounts for the year
ended 31 March 2022.
General
3.  North Lanarkshire Council and I have fulfilled our statutory responsibilities for the preparation
of the 2021/22 annual accounts. All the accounting records, documentation and other matters
which I am aware are relevant to the preparation of the annual accounts have been made
available to you for the purposes of your audit. All transactions undertaken by North Lanarkshire
Council have been recorded in the accounting records and are properly reflected in the financial
statements.  
Financial Reporting Framework
4.  The annual accounts have been prepared in accordance with the Code of Practice on Local
Authority Accounting in the United Kingdom 2021/22 (2021/22 accounting code), and in
accordance with the requirements of the Local Government (Scotland) Act 1973, the Local
Government in Scotland Act 2003 and The Local Authority Accounts (Scotland) Regulations
2014.
5.  In accordance with the 2014 regulations, I have ensured that the financial statements give a
true and fair view of the financial position of the North Lanarkshire Council and its Group at 31
March 2022 and the transactions for 2021/22. 
Accounting Policies & Estimates
6.  All significant accounting policies applied are as shown in the notes to the financial
statements. The accounting policies are determined by the 2021/22 accounting code where
applicable. Where the code does not specifically apply I have used judgement in developing
and applying an accounting policy that results in information that is relevant and reliable. All
accounting policies applied are appropriate to North Lanarkshire Council’s circumstances and
have been consistently applied. Page 19 of 209

Page 20

7.  The significant assumptions used in making accounting estimates are reasonable and
properly reflected in the financial statements. Judgements used in making estimates have been
based on the latest available, reliable information. Estimates have been revised where there are
changes in the circumstances on which the original estimate was based or as a result of new
information or experience.
Going Concern Basis of Accounting
8.  I have assessed North Lanarkshire Council's ability to continue to use the going concern
basis of accounting and have concluded that it is appropriate. I am not aware of any material
uncertainties that may cast significant doubt on North Lanarkshire Council’s ability to continue
as a going concern. 
Assets
9.  Where a rolling programme of asset valuations has been used, I have satisfied myself that
the carrying amount of assets at 31 March 2022 does not differ materially from that which would
be determined if a revaluation had been carried out at that date.
10.  I carried out an assessment at 31 March 2022 as to whether there is any indication that an
asset may be impaired and have recognised any impairment losses identified.
11.  I have provided you with all information of which I am aware regarding any valuation
exercises carried out after 31 March 2022. 
12.  There are no plans or intentions that are likely to affect the carrying value or classification of
the assets recognised within the financial statements.
13.  Owned assets are free from any lien, encumbrance or charge except as disclosed in the
financial statements. 
Liabilities
14.  All liabilities at 31 March 2022 of which I am aware have been recognised in the annual
accounts.
15.  Provisions have been recognised in the financial statements for all liabilities of uncertain
timing or amount at 31 March 2022 of which I am aware where the conditions specified in the
2021/22 accounting code have been met. The amount recognised as a provision is the best
estimate of the expenditure likely to be required to settle the obligation at 31 March 2022.
Where the effect of the time value of money is material, the amount of the provision has been
discounted to the present value of the expected payments.
16.  Provisions recognised in previous years have been reviewed and adjusted, where
appropriate, to reflect the best estimate at 31 March 2022 or to reflect material changes in the
assumptions underlying the calculations of the cash flows.
17.  The accrual recognised in the financial statements for holiday untaken by 31 March 2022
has been estimated on a reasonable basis.
18.  The pension assumptions made by the actuary in the IAS 19 report for North Lanarkshire
Council have been considered and I confirm that they are consistent with management's own
view.
19.  There are no plans or intentions that are likely to affect the carrying value or classification of
the liabilities recognised in the financial statements.
Page 20 of 209

Page 21

Contingent liabilities
20.  There are no significant contingent liabilities, other than those disclosed in Note 23 to the
financial statements, arising either under formal agreement or through formal undertakings
requiring disclosure in the accounts. All known contingent liabilities have been fully and properly
disclosed, including any outstanding legal claims which have not been provided under the Code
of Practice on Local Authority Accounting in the United Kingdom 2021/22 and IAS 37.
21.  With specific reference to equal pay claims I can confirm that it is not possible to quantify
the contingent liability.
Fraud
22.  I have provided you with all information in relation to:
• my assessment of the risk that the financial statements may be materially misstated
because of fraud 
• any allegations of fraud or suspected fraud affecting the financial statements
• fraud or suspected fraud that I am aware of involving management, employees who
have a significant role in internal control, or others that could have a material effect on
the financial statements. 
Laws and Regulations
23.  I have disclosed to you all known instances of non-compliance or suspected non-
compliance with laws and regulations whose effects should be considered when preparing
financial statements.
Related Party Transactions
24.  All material transactions with related parties have been appropriately accounted for and
disclosed in the financial statements in accordance with the 2021/22 accounting code.  I have
made available to you the identity of all the North Lanarkshire Council's related parties and all
the related party relationships and transactions of which I am aware.
Remuneration Report
25.  The Remuneration Report has been prepared in accordance with the Local Authority
Accounts (Scotland) Amendment Regulations 2014, and all required information of which I am
aware has been provided to you.
Management commentary
26.  I confirm that the Management Commentary has been prepared in accordance with the
statutory guidance and the information is consistent with the financial statements. 
Corporate Governance
27.  I confirm that the North Lanarkshire Council has undertaken a review of the system of
internal control during 2021/22 to establish the extent to which it complies with proper practices
set out in the Delivering Good Governance in Local Government: Framework 2016. I have
disclosed to you all deficiencies in internal control identified from this review or of which I am
otherwise aware.
28.  I confirm that the Annual Governance Statement has been prepared in accordance with the
Delivering Good Governance in Local Government: Framework 2016 and the information is
consistent with the financial statements. There have been no changes in the corporate Page 21 of 209

Page 22

governance arrangements or issues identified, since 31 March 2022, which require to be
reflected. 
Group Accounts
29.  I have identified all the other entities in which North Lanarkshire Council has a material
interest and have classified and accounted for them in accordance with the 2021/22 accounting
code. Any significant issues with the financial statements of group entities, including any
qualified audit opinions, have been advised to you.
Common Good Fund
30.  The Council has published on its website an initial list of assets which may be part of the
Common Good. Establishing what property is common good can only be determined by
researching the facts and circumstances of its acquisition and its subsequent use therefore as a
result these assets are not currently separately identified within the annual accounts however
this remains under review. Work is undertaken as part of the disposal process to confirm that
the asset is not a common good asset. 
Events Subsequent to the Date of the Balance Sheet
31.  All events subsequent to 31 March 2022 for which the 2021/22 accounting code requires
adjustment or disclosure have been adjusted or disclosed. 
Comparative information
32.  I confirm that, in respect of the restatement to correct a material misstatement in prior period
financial statements that affects the comparative information, the adjustment relates to a change
in presentation as I believe it is more appropriate. 
Yours sincerely 
[electronic sig] 
Elaine Kemp
Head of Financial Solutions
Section 95 Officer
XX/XX/XXXX
Page 22 of 209

Page 23

Audit and Scrutiny Panel
27 October 2022 
JC McNaught Poor Children’s Holiday Fund and North Lanarkshire Council
Educational Endowments 
Audit of 2021/22 annual report and accounts 
Independent auditor’s report
1. Our audit work on the 2021/22 annual accounts is now substantially complete. Subject to
receipt of a revised set of annual accounts for final review, we anticipate being able to issue
unqualified audit opinions in the independent auditor’s report on 27/10/22 (the proposed
report is attached at Appendix A).
Annual audit report
2. Under International Standards on Auditing in the UK, we report specific matters arising
from the audit of the financial statements to those charged with governance of a body in
sufficient time to enable appropriate action. We present for the Audit and Scrutiny Panel’s
consideration our draft annual report on the 2021/22 audit. The section headed “Significant
findings from the audit in accordance with ISA 260” sets out the issues identified in respect of
the annual report and accounts.
3. The report also sets out conclusions from our consideration of the four audit dimensions
that frame the wider scope of public audit as set out in the Code of Audit Practice.
4. This report will be issued in final form after the annual accounts have been certified.
Unadjusted misstatements
5. We also report to those charged with governance all unadjusted misstatements which we
have identified during our audit, other than those of a trivial nature and request that these
misstatements be corrected.
6. We have no unadjusted misstatements to be corrected.
Fraud, subsequent events and compliance with laws and regulations
7. In presenting this report to the Audit and Scrutiny Panel we seek confirmation from those
charged with governance of any instances of any actual, suspected or alleged fraud; any
subsequent events that have occurred since the date of the financial statements; or material
non-compliance with laws and regulations affecting the entity that should be brought to our
attention.
Representations from Section 95 Officer
8. As part of the completion of our audit, we are seeking written representations from the
Section 95 Officer on aspects of the annual accounts, including the judgements and
estimates made.
Page 23 of 209

Page 24

9. A draft letter of representation is attached at Appendix B. This should be signed and
returned to us by the Section 95 Officer with the signed annual accounts prior to the
independent auditor’s report being certified.
Outstanding matters 
10. There is one item of supporting documentation which remains outstanding for the audit
and that is a share certificate for ordinary shares the Educational Endowment has with Royal
Bank of Scotland. 
Page 24 of 209

Page 25

APPENDIX A: Proposed Independent Auditor’s Report
Independent auditor’s report to the trustees of JC McNaught Poor Children’s Holiday Fund
and the Accounts Commission
Reporting on the audit of the financial statements
Opinion on financial statements
I certify that I have audited the financial statements in the statement of accounts of JC
McNaught Poor Children’s Holiday Fund for the year ended 31 March 2022 under Part VII of
the Local Government (Scotland) Act 1973 and section 44(1)(c) of the Charities and Trustee
Investment (Scotland) Act 2005. The financial statements comprise the Statement of
Receipts and Payments, Statement of Balances and notes to the financial statements,
including significant accounting policies. The financial reporting framework that has been
applied in their preparation is applicable law and a receipts and payments basis
In my opinion the accompanying financial statements:
• properly present the receipts and payments of the charity for the year ended 31 March
2022 and its statement of balances at that date; and
• have been prepared in accordance with the requirements of the Charities and Trustee
Investment (Scotland) Act 2005, and regulations 9(1),(2) and (3) of The Charities
Accounts (Scotland) Regulations 2006.
Basis for opinion
I conducted my audit in accordance with applicable law and International Standards on
Auditing (UK) (ISAs (UK)), as required by the Code of Audit Practice approved by the
Accounts Commission for Scotland. My responsibilities under those standards are further
described in the auditor’s responsibilities for the audit of the financial statements section of
my report. I am independent of the charity in accordance with the ethical requirements that
are relevant to my audit of the financial statements in the UK including the Financial
Reporting Council’s Ethical Standard, and I have fulfilled my other ethical responsibilities in
accordance with these requirements. I believe that the audit evidence I have obtained is
sufficient and appropriate to provide a basis for my opinion.
Responsibilities of the trustees for the financial statements
The trustees are responsible for the preparation of financial statements that properly present
the receipts and payments of the charity, and for such internal control as the trustees
determines is necessary to enable the preparation of financial statements that are free from
material misstatement, whether due to fraud or error.
Auditor’s responsibilities for the audit of the financial statements
My objectives are to obtain reasonable assurance about whether the financial statements as
a whole are free from material misstatement, whether due to fraud or error, and to issue an
auditor’s report that includes my opinion. Reasonable assurance is a high level of assurance,
but is not a guarantee that an audit conducted in accordance with ISAs (UK) will always
detect a material misstatement when it exists. Misstatements can arise from fraud or error
and are considered material if, individually or in the aggregate, they could reasonably be
Page 25 of 209

Page 26

expected to influence the economic decisions of users taken on the basis of these financial
statements.
Irregularities, including fraud, are instances of non-compliance with laws and regulations. I
design procedures in line with my responsibilities outlined above to detect material
misstatements in respect of irregularities, including fraud. Procedures include:
• obtaining an understanding of the applicable legal and regulatory framework and how
the charity is complying with that framework;
• identifying which laws and regulations are significant in the context of the charity;
• assessing the susceptibility of the financial statements to material misstatement,
including how fraud might occur; and
• considering whether the audit team collectively has the appropriate competence and
capabilities to identify or recognise non-compliance with laws and regulations.
The extent to which my procedures are capable of detecting irregularities, including fraud, is
affected by the inherent difficulty in detecting irregularities, the effectiveness of the charity’s
controls, and the nature, timing and extent of the audit procedures performed.
Irregularities that result from fraud are inherently more difficult to detect than irregularities that
result from error as fraud may involve collusion, intentional omissions, misrepresentations, or
the override of internal control. The capability of the audit to detect fraud and other
irregularities depends on factors such as the skilfulness of the perpetrator, the frequency and
extent of manipulation, the degree of collusion involved, the relative size of individual
amounts manipulated, and the seniority of those individuals involved.
A further description of the auditor’s responsibilities for the audit of the financial statements is
located on the Financial Reporting Council's website www.frc.org.uk/auditorsresponsibilities.
This description forms part of my auditor’s report.
Reporting on other requirements
Other information 
The trustees are responsible for other information in the statement of accounts. The other
information comprises the Trustees’ Annual Report. 
My responsibility is to read all the other information and, in doing so, consider whether the
other information is materially inconsistent with the financial statements or my knowledge
obtained in the course of the audit or otherwise appears to be materially misstated. If I
identify such material inconsistencies or apparent material misstatements, I am required to
determine whether this gives rise to a material misstatement in the financial statements
themselves. If, based on the work I have performed, I conclude that there is a material
misstatement of this other information, I am required to report that fact. I have nothing to
report in this regard. 
My opinion on the financial statements does not cover the other information and I do not express
any form of assurance conclusion thereon except on the Trustees’ Annual Report to the extent
explicitly stated in the following opinion prescribed by the Accounts Commission.
Page 26 of 209

Page 27

Opinions prescribed by the Accounts Commission on the Trustees’
Annual Report
In my opinion, based on the work undertaken in the course of the audit, the information given
in the Trustees' Annual Report for the financial year for which the financial statements are
prepared is consistent with the financial statements and that report has been prepared in
accordance with The Charity Accounts (Scotland) Regulations 2006.
Matters on which I am required to report by exception
I am required by The Charity Accounts (Scotland) Regulations 2006 to report to you if, in my
opinion:
• proper accounting records have not been kept; or
• the financial statements are not in agreement with the accounting records; or
• I have not received all the information and explanations I require for my audit.
I have nothing to report in respect of these matters.
Use of my report
This report is made solely to the parties to whom it is addressed in accordance with Part VII
of the Local Government (Scotland) Act 1973 and for no other purpose. In accordance with
paragraph 120 of the Code of Audit Practice, I do not undertake to have responsibilities to
members or officers, in their individual capacities, or to third parties.
[electronic sig] 
Pauline Murray
Audit Scotland
4th Floor
102 West Port
Edinburgh
EH3 9DN
27/10/2022 
Pauline Murray (Audit Scotland) is eligible to act as an auditor in terms of Part VII of the Local
Government (Scotland) Act 1973 
Page 27 of 209

Page 28

Independent auditor’s report to the trustees of the North Lanarkshire Council
Educational Endowments and the Accounts Commission
Reporting on the audit of the financial statements
Opinion on financial statements
I certify that I have audited the financial statements in the statement of accounts of North
Lanarkshire Council Educational Endowments for the year ended 31 March 2022 under Part
VII of the Local Government (Scotland) Act 1973 and section 44(1)(c) of the Charities and
Trustee Investment (Scotland) Act 2005. The financial statements comprise the Statement of
Receipts and Payments, Statement of Balances and notes to the financial statements,
including significant accounting policies. The financial reporting framework that has been
applied in their preparation is applicable law and a receipts and payments basis
In my opinion the accompanying financial statements:
• properly present the receipts and payments of the charity for the year ended 31 March
2022 and its statement of balances at that date; and
• have been prepared in accordance with the requirements of the Charities and Trustee
Investment (Scotland) Act 2005, and regulations 9(1),(2) and (3) of The Charities
Accounts (Scotland) Regulations 2006.
Basis for opinion
I conducted my audit in accordance with applicable law and International Standards on
Auditing (UK) (ISAs (UK)), as required by the Code of Audit Practice approved by the
Accounts Commission for Scotland. My responsibilities under those standards are further
described in the auditor’s responsibilities for the audit of the financial statements section of
my report. I am independent of the charity in accordance with the ethical requirements that
are relevant to my audit of the financial statements in the UK including the Financial
Reporting Council’s Ethical Standard, and I have fulfilled my other ethical responsibilities in
accordance with these requirements. I believe that the audit evidence I have obtained is
sufficient and appropriate to provide a basis for my opinion.
Responsibilities of the trustees for the financial statements
The trustees are responsible for the preparation of financial statements that properly present
the receipts and payments of the charity, and for such internal control as the trustees
determines is necessary to enable the preparation of financial statements that are free from
material misstatement, whether due to fraud or error.
Auditor’s responsibilities for the audit of the financial statements
My objectives are to obtain reasonable assurance about whether the financial statements as
a whole are free from material misstatement, whether due to fraud or error, and to issue an
auditor’s report that includes my opinion. Reasonable assurance is a high level of assurance,
but is not a guarantee that an audit conducted in accordance with ISAs (UK) will always
detect a material misstatement when it exists. Misstatements can arise from fraud or error
and are considered material if, individually or in the aggregate, they could reasonably be
Page 28 of 209

Page 29

expected to influence the economic decisions of users taken on the basis of these financial
statements.
Irregularities, including fraud, are instances of non-compliance with laws and regulations. I
design procedures in line with my responsibilities outlined above to detect material
misstatements in respect of irregularities, including fraud. Procedures include:
• obtaining an understanding of the applicable legal and regulatory framework and how
the charity is complying with that framework;
• identifying which laws and regulations are significant in the context of the charity;
• assessing the susceptibility of the financial statements to material misstatement,
including how fraud might occur; and
• considering whether the audit team collectively has the appropriate competence and
capabilities to identify or recognise non-compliance with laws and regulations.
The extent to which my procedures are capable of detecting irregularities, including fraud, is
affected by the inherent difficulty in detecting irregularities, the effectiveness of the charity’s
controls, and the nature, timing and extent of the audit procedures performed.
Irregularities that result from fraud are inherently more difficult to detect than irregularities that
result from error as fraud may involve collusion, intentional omissions, misrepresentations, or
the override of internal control. The capability of the audit to detect fraud and other
irregularities depends on factors such as the skilfulness of the perpetrator, the frequency and
extent of manipulation, the degree of collusion involved, the relative size of individual
amounts manipulated, and the seniority of those individuals involved.
A further description of the auditor’s responsibilities for the audit of the financial statements is
located on the Financial Reporting Council's website www.frc.org.uk/auditorsresponsibilities.
This description forms part of my auditor’s report.
Reporting on other requirements
Other information 
The trustees are responsible for other information in the statement of accounts. The other
information comprises the Trustees’ Annual Report. 
My responsibility is to read all the other information and, in doing so, consider whether the
other information is materially inconsistent with the financial statements or my knowledge
obtained in the course of the audit or otherwise appears to be materially misstated. If I
identify such material inconsistencies or apparent material misstatements, I am required to
determine whether this gives rise to a material misstatement in the financial statements
themselves. If, based on the work I have performed, I conclude that there is a material
misstatement of this other information, I am required to report that fact. I have nothing to
report in this regard. 
My opinion on the financial statements does not cover the other information and I do not express
any form of assurance conclusion thereon except on the Trustees’ Annual Report to the extent
explicitly stated in the following opinion prescribed by the Accounts Commission.
Page 29 of 209

Page 30

Opinions prescribed by the Accounts Commission on the Trustees’
Annual Report
In my opinion, based on the work undertaken in the course of the audit, the information given
in the Trustees' Annual Report for the financial year for which the financial statements are
prepared is consistent with the financial statements and that report has been prepared in
accordance with The Charity Accounts (Scotland) Regulations 2006.
Matters on which I am required to report by exception
I am required by The Charity Accounts (Scotland) Regulations 2006 to report to you if, in my
opinion:
• proper accounting records have not been kept; or
• the financial statements are not in agreement with the accounting records; or
• I have not received all the information and explanations I require for my audit.
I have nothing to report in respect of these matters.
Use of my report
This report is made solely to the parties to whom it is addressed in accordance with Part VII
of the Local Government (Scotland) Act 1973 and for no other purpose. In accordance with
paragraph 120 of the Code of Audit Practice, I do not undertake to have responsibilities to
members or officers, in their individual capacities, or to third parties.
[electronic sig] 
Pauline Murray
Audit Scotland
4th Floor
102 West Port
Edinburgh
EH3 9DN
27/10/2022 
Pauline Murray (Audit Scotland) is eligible to act as an auditor in terms of Part VII of the Local
Government (Scotland) Act 1973 
Page 30 of 209

Page 31

APPENDIX B Letter of Representation (ISA 580)
Pauline Murray
Audit Scotland
4th Floor
102 West Port
Edinburgh
EH3 9DN
27 October 2022
Dear Pauline
JC McNaught Poor Children’s Holiday Fund and North Lanarkshire Council
Educational Endowments 
Annual report and accounts 2021/22
1. This representation letter is provided about your audit of the annual accounts of North
Lanarkshire Council's registered charities where the sole trustees are officers of North
Lanarkshire Council, in an ex-officio capacity, for the year ended 31 March 2022 for the
purpose of expressing an opinion as to whether the financial statements give a true and fair
view in accordance with the financial reporting framework, and for expressing other opinions
on the remuneration report, management commentary and annual governance statement.
2. I confirm to the best of my knowledge and belief and having made appropriate enquiries of
the Chief Executive and Corporate Management Team, the following representations given to
you in connection with your audit of North Lanarkshire Council’s annual accounts for the year
ended 31 March 2022. 
General
3. North Lanarkshire Council (as administering authority) and I have fulfilled our statutory
responsibilities for the preparation of the 2021/22 annual accounts. All the accounting
records, documentation and other matters which I am aware are relevant to the preparation
of the annual accounts have been made available to you for the purposes of your audit. All
transactions undertaken by the trusts have been recorded in the accounting records and are
properly reflected in the financial statements.
4. I confirm that the effects of uncorrected misstatements are immaterial, individually and in
aggregate, to the financial statements as a whole. I am not aware of any uncorrected
misstatements other than those reported by you.
5. The information given in the Trustee's Annual Report to the financial statements presents a
balanced picture of each registered trust and is consistent with the financial statements. 
Financial Reporting Framework
6. The financial statements comply with the requirements of the Charities and Trustee
Investment (Scotland) Act 2005, and the regulations 9(1), (2) and (3) of the Charities
Accounts (Scotland) Regulations 2006.
Page 31 of 209

Page 32

7. Disclosure has been made in the financial statements of all matters necessary for them to
properly present the receipts and payments and statement of balances of each registered
charitable trust for the year ended 31 March 2022. 
Accounting Policies & Estimates
8. All significant accounting policies applied are as shown in the notes to the financial
statements. The accounting policies are determined by the 2021/22 accounting code where
applicable. Where the code does not specifically apply I have used judgement in developing
and applying an accounting policy that results in information that is relevant and reliable. All
accounting policies applied are appropriate to the trust’s circumstances and have been
consistently applied.
9. The significant assumptions used in making accounting estimates are reasonable and
properly reflected in the financial statements. 
Going Concern Basis of Accounting
10. I have assessed each registered trusts’ ability to continue as a going concern and I am
not aware of any material uncertainties that have arisen as a result. 
Fraud
11. I have provided you with all information in relation to:
• my assessment of the risk that the financial statements may be materially misstated
because of fraud
• any allegations of fraud or suspected fraud affecting the financial statements
• fraud or suspected fraud that I am aware of involving management, employees who
have a significant role in internal control, or others that could have a material effect on
the financial statements. 
Laws and Regulations
12. I have disclosed to you all known instances of non-compliance or suspected non-
compliance with laws and regulations whose effects should be considered when preparing
financial statements. 
Related Party Transactions
13. I am not aware of any material transactions with related parties. 
Corporate Governance
14. I confirm that there are no issues or deficiencies in internal control that require to be
disclosed.
Page 32 of 209

Page 33

Events Subsequent to the Date of the Balance Sheet
15. All events subsequent to 31 March 2022 for which the 2021/22 accounting code requires
adjustment or disclosure have been adjusted or disclosed. 
Yours sincerely, 
[electronic sig]
Elaine Kemp
Section 95 Officer
Page 33 of 209

Page 34

Page 34 of 209

Page 35

North Lanarkshire Council
Report
Audit and Scrutiny Panel 
Does this report require to be approved? ☐ Yes   ☒ No
Ref: KA/ASP/October22 Date 27/10/22 
External Audit – Annual Audit Report 2021-22 
From:  Ken Adamson, Head of Audit and Risk
E-mail: adamsonk@northlan.gov.uk Telephone 07939 280602 
Executive Summary
The purpose of this report is to present to elected members the Annual Audit Report produced
by the Council’s appointed external auditors, Audit Scotland, in respect of the audit of the
Council for the year-ending 31 March 2022.
A copy of the external auditor’s Annual Audit Report is attached to this report.  Members
should note that the report contains an action plan which includes audit recommendations
and responses, including planned actions, which have been agreed by management.
The external auditor will speak to the Panel about the above audit output at the meeting and
highlight to members the work undertaken and any issues arising from their work that they
wish to bring to the Panel’s attention.
Recommendations
The Panel is invited to:
(a) consider and note the external auditors’ annual audit report; and
(b) agree to monitor, through reports from Internal Audit, implementation by
management of actions agreed in response to external audit’s recommendations.
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
AGENDA ITEM 4
Page 35 of 209

Page 36

1. Background
1.1 The Accounts Commission have appointed Audit Scotland as the Council’s appointed
external auditor.  Expected outputs to be produced by the Council’s external auditors are
outlined each year in their annual planning document.
1.2 The external auditor is required to annually prepare a report for members and the
Controller of Audit summarising the audit work done and presenting the main findings
arising from the audit.  The report (which is at Appendix 1) has been discussed and
agreed with senior management.  
2. Key issues arising
2.1 The external auditor’s report presents key matters arising from each of the main areas
of work undertaken by the external auditor including the audit of the financial statements
and issues relating to the Council’s financial management, financial sustainability,
governance and best value arrangements.
2.2 As outlined in the report, the external auditor’s audit opinion on the 2021-22 financial
statements is unmodified.  Although a few issues are highlighted where action was
required during the audit process and/or scope for further improvement exists; overall
the report is considered by management to be generally positive in tone.
2.3 Appendix 1 of the Audit Scotland report contains a number of audit recommendations
and management responses including planned actions, responsible officers and
timescales.  Progress implementing agreed actions will be monitored by Internal Audit
and reported to future meetings of the Panel. 
3. Measures of success
3.1 External audit reports annually to the Panel on its work.  The Council seeks to achieve
an unqualified opinion on its financial statements and positive comments (or the absence
of critical comments) in respect of those wider aspects considered by the external audit
process.
3.2 The Council is committed to delivering effective and efficient financial reporting and high
standards of financial management and corporate governance which underpin the
delivery of Council services and the achievement of planned outcomes and corporate
priorities and ambitions.
3.3 Both Internal and External Audit report directly to the Audit and Scrutiny Panel on the
results of their work, including their respective assessments of the adequacy and
effectiveness of the Council’s financial management and wider corporate governance
arrangements. 
4. Supporting documentation
Appendix 1 Audit Scotland Annual Audit Plan 2021-22 
Ken Adamson, Head of Audit and Risk 
Page 36 of 209

Page 37

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
5.9 Risk impact
Is there a risk impact?
Yes ☐ No ☒ 
Page 37 of 209

Page 38

Prepared for the Members of North Lanarkshire Council and the Controller of Audit 
October 2022
North Lanarkshire Council
2021/22 Annual Audit Report – DRAFT 
Page 38 of 209

Page 39

North Lanarkshire Council 2021/22 Annual Audit Report – DRAFT | 2
Contents 
Key messages 3
Introduction 4
1. Audit of 2021/22 annual accounts 7
2. Financial management 15
3. Financial sustainability 23
4. Governance and transparency 25
5. Best Value 27
Appendix 1. Action plan 2021/22 31
Appendix 2. Summary of 2021/22 national reports and briefings 35
Page 39 of 209

Page 40

Key messages | 3 
Key messages 
2021/22 annual accounts 
1 Our audit opinions on the annual accounts of the council, its group and
the section 106 charities administered by the council are unmodified.
2 The audited financial statements include changes to the accounting
treatment of Culture and Leisure North Lanarkshire (CLNL) following
the transfer of services back to the council on 1 April 2021.  
3 The audited Remuneration Report now reflects minor changes after we
examined the supporting evidence for loss of office payments.
Financial management and sustainability 
4 The council reported a provisional underspend against budget of £28
million. The General Fund (including HRA) increased by £55 million as
a result of underspends.
5 The Covid-19 pandemic resulted in 2021/22 costs of £68 million, which
were mostly funded by Scottish Government Covid-19 funding and
council reserves.
6 The council has a well-developed medium-term financial plan. The
council’s projections to 2027/28 forecast a cumulative funding gap of
£109 million.
Governance and transparency
7 Governance arrangements operating throughout 2021/22 were
appropriate and operated effectively.
Best Value 
8 Good progress has been made in addressing previous Best Value
Assurance Report findings. 
Page 40 of 209

Page 41

Introduction | 4 
Introduction 
1.  This report summarises the findings arising from the 2021/22 audit of North
Lanarkshire Council (the council) and its group. 
2.  The scope of the audit was set out in our 2021/22 Annual Audit Plan
presented to the September 2022 meeting of the Audit and Scrutiny Panel. 
3.  This report comprises the findings from: 
• an audit of the annual accounts
• consideration of the four audit dimensions that frame the wider scope of
public audit set out in the Code of Audit Practice 2016 namely, financial
management, financial sustainability, governance and transparency and
value for money.
4.  The main elements of our audit work in 2021/22 have been:
• an audit of the annual accounts of the council and its group, including
the statement of accounts of the two section 106 charities administered
by the council, and the issue of independent auditor's reports setting out
our opinions
• a review of the council's key financial systems 
• audit work on the council’s progress in implementing recommendations
reported in our Best Value Assurance Report published in May 2019
• consideration of the four audit dimensions.
5.  The global coronavirus pandemic continued to impact on North Lanarkshire
Council during 2021/22. This has had implications for the services it delivers
and its ability to achieve strategic priorities. We considered the risks related to
the pandemic as part of our audit planning and did not consider there to be any
significant audit risks for 2021/22.
Adding value through the audit
6.  We add value to the council through the audit by:
• identifying and providing insight on significant risks, and making clear
and relevant recommendations 
• sharing intelligence and good practice through our national reports
(Appendix 4) and good practice guides 
Page 41 of 209

Page 42

Introduction | 5 
• providing clear and focused conclusions on the appropriateness,
effectiveness and impact of corporate governance, performance
management arrangements and financial sustainability.
Responsibilities and reporting
7.  The council has primary responsibility for ensuring the proper financial
stewardship of public funds. This includes preparing annual accounts that are in
accordance with proper accounting practices. 
8.  The council is also responsible for compliance with legislation, and putting
arrangements in place for governance and propriety that enable it to
successfully deliver its objectives.
9.  Our responsibilities as independent auditor appointed by the Accounts
Commission are established by the Local Government in Scotland Act 1973, the
Code of Audit Practice 2016 and supplementary guidance, and International
Standards on Auditing in the UK.
10.  As public sector auditors we give independent opinions on the annual
accounts. Additionally, we conclude on:
• the effectiveness of the council’s performance management
arrangements, 
• the suitability and effectiveness of corporate governance arrangements,
and financial position
• the arrangements for securing financial sustainability and,
• Best Value arrangements. 
11.   Further details of the respective responsibilities of management and the
auditor can be found in the Code of Audit Practice 2016. and supplementary
guidance.
12.  This report raises matters from our audit. Weaknesses or risks identified are
only those which have come to our attention during our normal audit work and
may not be all that exist. Communicating these does not absolve management
from its responsibility to address the issues we raise and to maintain adequate
systems of control.
13.  Our annual audit report contains an agreed action plan at Appendix 1
setting out specific recommendations, responsible officers and dates for
implementation. It also includes outstanding actions from last year and the
steps being taken to implement them.
Auditor Independence 
14.  Auditors appointed by the Accounts Commission or Auditor General must
comply with the Code of Audit Practice and relevant supporting guidance. When
auditing the financial statements auditors must comply with professional
standards issued by the Financial Reporting Council and those of the
Page 42 of 209

Page 43

Introduction | 6 
professional accountancy bodies. We can confirm that we comply with the
Financial Reporting Council’s Ethical Standard. We can also confirm that we
have not undertaken any non-audit related services and therefore the 2021/22
audit fee of £540,526 as set out in our Annual Audit Plan remains unchanged.
We are not aware of any relationships that could compromise our objectivity
and independence.
15.  This report is addressed to both the council and the Controller of Audit and
will be published on Audit Scotland's website www.audit-scotland.gov.uk in due
course. We would like to thank the management and staff who have been
involved in our work for their cooperation and assistance during the audit.
Audit appointment from 2022/23
16.  External auditors are usually appointed for a five-year term either from Audit
Scotland’s Audit Services Group or a private firm of accountants. The current
appointment round was due to end in 2020/21 but this was extended for a year
so that 2021/22 is the last year of the current appointment round. The
procurement process for the new round of audit appointments was completed in
May 2022. From financial year 2022/23 Audit Scotland will continue to be the
appointed auditor for North Lanarkshire Council.
17.  A new Code of Audit Practice applies to public sector audits for financial
years starting on or after 1 April 2022. It replaces the Code issued in May 2016.
There are several significant changes introduced by the new Code, namely the
integration of Best Value work into wider scope audit work and the audit of Best
Value across the Integration Joint Boards.
18.  We would like to thank elected members, Audit and Scrutiny Panel
members, Chief Officers, and other staff, particularly those in finance for their
co-operation and assistance over the last six years. 
Page 43 of 209

Page 44

1. Audit of 2021/22 annual accounts | 7 
1. Audit of 2021/22 annual
accounts
The principal means of accounting for the stewardship of resources and
performance 
Main judgements
Our audit opinions on the annual accounts of the council, its group and the section
106 charities administered by the council are unmodified. 
The audited financial statements include changes to the accounting treatment of
Culture and Leisure North Lanarkshire (CLNL) following the transfer of services
back to the council on 1 April 2021.   
The audited Remuneration Report now reflects minor changes after we examined
the supporting evidence for loss of office payments. 
Our audit opinions on the annual accounts are unmodified 
19.  The accounts for the council and its group for the year ended 31 March
2022 were approved by the Audit and Scrutiny Panel on 26 October 2022. As
reported in the independent auditor’s report:
• the financial statements give a true and fair view and were properly
prepared in accordance with the financial reporting framework 
• the audited part of the remuneration report, management commentary
and the annual governance statement were all consistent with the
financial statements and properly prepared in accordance with the
relevant regulations and guidance.
20.  Our audit opinions on Section 106 charities were also unmodified (TBC).
These covered the 2021/22 statement of accounts on North Lanarkshire
Council Educational Endowments and the JC McNaught Poor Children’s
Holiday Fund. 
The annual accounts were submitted in line with our agreed
audit timetable
21.  The unaudited annual accounts were received in line with our agreed audit
timetable on 30 June 2022. The working papers provided with the unaudited
Page 44 of 209

Page 45

1. Audit of 2021/22 annual accounts | 8 
accounts were largely of a good standard and finance staff provided support to
the audit team during the audit. We did however, encounter a number of
challenges as part of the audit of the group, with changes to the accounting
treatment of Culture and Leisure North Lanarkshire (CLNL) following the
transfer of services back to the council on 1 April 2021. These changes are
reflected in the audited financial statements. In addition, there were issues with
the quality of some of the working papers provided for the group accounts.
Our audit opinions on Section 106 charities were unmodified
(TBC)
22.  Due to the interaction of section 106 of the Local Government in Scotland
Act 1973 with the charities legislation, a separate independent auditor's report is
required for the statement of accounts of each registered charity where
members of North Lanarkshire Council are sole trustees, irrespective of the size
of the charity. 
23.  Our audit opinions on the Section 106 charities are unmodified. 
There were no objections raised to the annual accounts 
24.  The Local Authority Accounts (Scotland) Regulations 2014 require local
government bodies to publish a public notice on its website that includes details
of the period for inspecting and objecting to the accounts. This must remain on
the website throughout the inspection period and no objections were received.
Overall materiality is £15 million
25.  We apply the concept of materiality in both planning and performing the
audit and in evaluating the effect of identified misstatement on the audit and of
uncorrected misstatements, if any, on the financial statements and in forming
the opinion in the auditor’s report. We identify a benchmark on which to base
overall materiality, such as gross expenditure, and apply what we judge to be
the most appropriate percentage level for calculating materiality values, we also
determine a lower performance materiality threshold. 
26.   The determination of materiality is based on professional judgement and is
informed by our understanding of the entity and what users are likely to be most
concerned about in the annual accounts. In assessing performance materiality,
we have considered factors such as our findings from previous audits, any
changes in business processes and the entity’s control environment including
fraud risks. 
27.  Our initial assessment of materiality for the annual accounts was carried out
during the planning phase of the audit. This was reviewed and revised on
receipt of the unaudited annual accounts and is summarised in Exhibit 1. 
Page 45 of 209

Page 46

1. Audit of 2021/22 annual accounts | 9 
Exhibit 1
Materiality values 
Materiality level Amount
Overall materiality  £15 million
Performance materiality £7.5 million
Reporting threshold £250 thousand
Source: Audit Scotland
We have significant findings to report on the audited annual
accounts 
28.  International Standard on Auditing (UK) 260 requires us to communicate
significant findings from the audit to those charged with governance, including
our view about the qualitative aspects of the body’s accounting practices. The
significant findings are summarised in Exhibit 2.
Exhibit 2
Significant findings from the audit of financial statements 
Issue Resolution 
1. Non-current asset valuations
At 31 March 2022, the council made an adjustment
to non-current asset valuations of £290 million
based on a desktop revaluation exercise. This was
in line with the agreed process from the prior year.
The adjustment was to reflect the estimated
material movements in fair value since the last full
valuation, to ensure the carrying value of assets
does not differ materially from current value. This is
a requirement per the Accounting Code of
Practice.  
The Code also requires the balance on
accumulated depreciation to be eliminated. The
unaudited accounts had not eliminated the
accumulated depreciation balance for those assets
subject to the desktop valuation. 
The council made the necessary
adjustment of £138 million to eliminate
accumulated depreciation. This
adjustment had a net nil impact on the
NBV and on the financial statements.
Although a five-year rolling revaluation
programme is permitted per the Code of
Audit Practice, significant movements in
intervening years may suggest that
revaluing each class of assets once
every five years is not sufficient and this
should be reconsidered, particularly as
inflationary pressures are having a
significant impact on retender and
rebuild prices.
Recommendation 1 
Page 46 of 209

Page 47

1. Audit of 2021/22 annual accounts | 10 
Issue Resolution 
The council should review the suitability
of its 5-year revaluation policy and
programme. This is particularly relevant
in light of the current economic climate
and inflationary impacts. 
(Refer Appendix 1, action plan)
2. In-sourcing of Culture and Leisure North
Lanarkshire
The council made the decision to in-source
services provided by Culture and Leisure North
Lanarkshire Limited (CLNL Ltd) from 1 April 2021. 
On review of the accounting treatment, we
identified that the merger or combination had been
wrongly treated in the unaudited statements:
• Notes and Statements did not adequately
disclose the transfer and opening balance
adjustments
• The Comprehensive Income and Expenditure
Statement wrongly recognised a gain.
These changes resulted in a net nil impact on the
cumulative reserve balance at the year end. 
The correct accounting treatment was
applied in the audited financial
statements and additional disclosures
added to ensure transparency in the
transfer of services form CLNL to the
council. 
3. Compensation for loss of office payments
As part of our audit of the remuneration report, we
examined the supporting evidence for two
“compensation for loss of office payments”. This
resulted in minor changes in the disclosures to
accurately reflect the one-off and continuing
enhanced pension payments borne by the council.
The audited accounts include the
updated disclosures in the
Remuneration Report. 
Source: Audit Scotland
29.  We have obtained audit assurances over the identified significant risks of
material misstatement to the financial statements. Exhibit 3 sets out the
significant risks of material misstatement to the financial statements we
identified in our 2021/22 Annual Audit Plan. It summarises the further audit
procedures we performed during the year to obtain assurances over these risks
and the conclusions from the work completed. 
Page 47 of 209

Page 48

1. Audit of 2021/22 annual accounts | 11 
Exhibit 3
Significant risks of material misstatement in the financial statements
Audit risk Assurance procedure Results and
conclusions
1. Risk of material
misstatement due to fraud
caused by the
management override of
controls
As stated in International
Standard on Auditing (UK)
240, management is in a
unique position to
perpetrate fraud because of
management’s ability to
override controls that
otherwise appear to be
operating effectively. 
Assessed the design and
implementation of controls over
journal entry processing. 
Made inquiries of individuals
involved in the financial reporting
process about inappropriate or
unusual activity relating to the
processing of journal entries and
other adjustments. 
Tested journals at the year-end
and post-closing entries and focus
on significant risk areas and
transactions with related parties.  
Considered the need to test journal
entries and other adjustments
during the period. 
Evaluated significant transactions
outside the normal course of
business. 
Assessed any changes to the
methods and underlying
assumptions used to prepare
accounting estimates compared to
the prior year. 
Focussed testing of accounting
accruals and prepayments. 
Results and Significant
Judgements: We did not
identify any significant
issues within our work on
journals. Our testing of
accruals and
prepayments did not
identify any errors and
there were no significant
transactions outside the
normal course of
business. 
Conclusion: No issues
were identified that
indicate management
override of controls.
2. Estimation in the
valuation of land and
buildings
The council operates a five-
year rolling programme of
revaluations with whole
asset classes being valued
once every five years.  
Per the Accounting Code of
Practice, this is acceptable
“provided that the carrying
amount does not differ
materially from that which
Reviewed the information provided
to the external valuer to assess for
completeness. 
Evaluated the competence,
capabilities, and objectivity of the
professional valuer. 
Completed a walkthrough of the
valuation process to obtain an
understanding of the process,
including the methodologies and
assumptions applied.  
Results and Significant
Judgements: No issues
were identified from the
review of the valuer, the
information provided to
the valuer or the
valuation process.
The council made an
adjustment based on a
desktop revaluation
exercise to ensure the
carrying value of assets,
which had not been fully
revalued in year, did not
Page 48 of 209

Page 49

1. Audit of 2021/22 annual accounts | 12 
Audit risk Assurance procedure Results and
conclusions
would be determined using
the current value at the end
of the reporting period.”    
Last year the assessment of
carrying value assets,
based on a sample of
school properties and
review of housing properties
indicated an understatement
of £63.6 
million, which was adjusted
in the audited accounts. 
Leisure properties and open
spaces are to be revalued in
2021/22.  Major asset
classes (school buildings
and housing) have not been
revalued for three and four
years respectively.   
A new valuer was appointed
from 2021/22.  
Management is required to
assess the current values of
other assets at the year
end. 
There is a risk that the
carrying value of assets not
subject to valuations in
2021/22 will be materially
misstated. 
Reviewed reports from the valuer
to confirm overall asset valuation
movements.  
Obtained an understanding of the
management’s involvement in the
valuation process to assess if
appropriate oversight has
occurred. 
Examined management’s
assessment of any assets not
revalued in 2021/22 against
evidence of changes in other
revalued assets.  
Tested the reconciliation between
the financial ledger and the
property asset register.  
Sample tested individual asset
valuations and lives. 
differ materially from
current value. 
Conclusion: In year
valuations, whether full
valuations or desktop
reviews, of changes in
fair value, were
appropriately conducted
and properly reflected in
the audited statements.
See the recommendation
in Appendix 1 on
reviewing the revaluation
policy.
Source: Audit Scotland   
Other areas of audit focus
30.  We identified in our 2021/22 Annual Audit Plan areas where we considered
there to be other risks of material misstatement to the financial statements.
Based on our assessment of the likelihood and magnitude of the risk, we did not
consider these to represent significant risks. The areas of specific audit focus
were:
• Valuation of the present value of promised retirement benefits and
North Lanarkshire Council’s share of the pension asset/liability of
Page 49 of 209

Page 50

1. Audit of 2021/22 annual accounts | 13 
Strathclyde Pension Fund. We considered the reasonableness of
actuarial estimates on material elements of the valuation using PwC
LLP to review actuarial assumptions across Scottish LGPS and the
accuracy of information provided to the actuary by the council and
assurances from the auditor of Strathclyde Pension Fund. There are no
matters which we need to bring to your attention.
• The accounting treatment and process for the in-sourcing of
Culture and Leisure North Lanarkshire Limited (CLNL Ltd). At the
time of drafting our Annual Audit Plan, our planned work was based on
transactions and balances continuing on a separate ledger to the
council’s main accounting system. This was not actually the case, but
we reviewed the accounting treatment for the transfer of CLNL
balances. The main findings from this work are summarised in Exhibit 2,
with changes in the unaudited financial statements to the accounting
method and disclosures.
Across the UK, a technical accounting issue has been
identified covering infrastructure assets. 
31.  Infrastructure assets typically include highways, footpaths, bridges and
culverts and are included at historical cost in the accounts (£262 million at North
Lanarkshire Council).  A replaced component of an asset has to be
derecognised and at some councils the records of additions were not detailed
enough to comply with accounting code requirements.  A failure to derecognise
assets correctly would have resulted in double-counting and an overstatement
of the gross book value; accumulated depreciation and potentially the net book
value of the assets.
32.  CIPFA/LASAAC considered the matter and proposed amendments to the
2021/22 accounting code to allow a reasonable assumption that the net book
value of replaced parts of infrastructure assets are £nil and a temporary
adaptation to remove the requirement to disclose gross book value and
accumulated depreciation in the financial statements. The Scottish Government
has issued Finance Circular 9/2022 to implement these changes. 
33.  At North Lanarkshire Council, management considered the records
available to support infrastructure additions and have since applied the above
statutory override and have amended the infrastructure disclosures in the
audited accounts. (TBC)
All identified misstatements were adjusted in the accounts
34.  Total misstatements identified were £32 million. We have reviewed the
nature and causes of these misstatements which mainly related to group
accounting. An adjustment of £28 million was made to change the accounting
treatment of the in-sourcing of CLNL as detailed in Exhibit 2. This had no impact
on the year end reserves position. 
35.   We have concluded that they arose from issues that have been isolated
and identified in their entirety and do not indicate further systemic error.
Page 50 of 209

Page 51

1. Audit of 2021/22 annual accounts | 14 
36.  In addition, in non-current assets we identified classification misstatements
totalling £4 million between asset categories including “assets under
construction”, “transfers” and “additions”. The highest value of these was a
misstatement of £2.4 million where expenditure was capitalised as an addition
in the year under council dwellings when it should have remained in assets
under construction. We reviewed our audit approach and conducted further
testing of asset additions. No further errors were identified.
37.  All misstatements above our reporting threshold have been adjusted for in
the audited accounts.
Reasonable progress was made on prior year
recommendations 
38.  The council has made reasonable progress in implementing our prior year
audit recommendations. Two out of five recommendations made in the prior
year have been substantially completed with two others partly completed. For
actions not yet implemented, revised responses and timescales have been
agreed with management, and are set out in Appendix 1.
Page 51 of 209

Page 52

2. Financial management | 15 
2. Financial management
Financial management is about financial capacity, sound budgetary
processes and whether the control environment and internal controls
are operating effectively.
Main judgements
The council reported a provisional underspend against budget of £28 million. The
General Fund (including HRA) increased by £55 million as a result of
underspends. 
The Covid-19 pandemic resulted in 2021/22 costs of £68 million, which were
mostly funded by Scottish Government Covid-19 funding and council reserves. 
The council has a track record of delivering savings but acknowledges that this is
becoming increasingly challenging. 
Weaknesses in some key controls resulted in additional audit work. 
The council operated within budget in 2021/22 
39.  The council approved a General Fund Revenue Budget of £849.4 million in
March 2021. This was later revised to incorporate the council’s Covid Recovery
Budget and resulted in a final budget of £874.7 million. The council reported a
provisional outturn service underspend against in-year budget of £28 million.
Services generally underspent and these are summarised in Exhibit 4. This
includes an underspend of £17 million at a corporate level. £8.7 million of this
underspend is from management of borrowing and a review of the loans fund
advance repayments policy undertaken in 2020/21. The council budgets
separately for expenditure from reserves and for additional income which is
transferred to reserves. The council spent £36 million from existing reserves
and created further new reserves of £74 million, leading to a net increase in
general fund (including HRA) of £55 million. 
Page 52 of 209

Page 53

2. Financial management | 16 
Exhibit 4
Summary of significant under/overspends against budget per provisional outturn 
Area £m Reason for variance
Underspends   
Education and Families £3.6 Savings in employee costs due to
the finalisation of the Early Years
operating model and updated
staffing structure in schools and
service headquarters. 
Enterprise and Communities £4.1 Savings in employee costs due to
vacancy savings across the
service and an underspend in
property costs. 
Chief Executives and other corporate
services 
£1.0 Savings in employee costs due to
a freeze on recruitment and other
employee costs underspends.
These savings were partly offset
by a delay in delivering Digital NL
savings.   
Source: North Lanarkshire Council 2021/22 Outturn Report 
Housing revenue account has an in-year deficit met from
reserves
40.  The council is required by legislation to maintain a separate housing
revenue account (HRA) and to ensure that rents are set a level which will at
least cover the costs of its social housing provision. 
41.  The council overall surplus of £27.6 million includes a £7.9 million deficit on
HRA services. This was largely as a result of increased repair costs due to
inflationary uplifts and rental recovery being less than budgeted.  
42.   The HRA balance of £19.5 million, forms part of the General Fund. £12.9
million of the HRA balance has been approved for specific purposes. These
include £5.1 million on Council Ambition, £2.5 million on the HRA capital energy
efficiency programme and £2.5 million to fund housing repairs. 
The financial position was effectively monitored 
43.  The council monitors the budget position through the year by monthly
budget monitoring reports to the Corporate Management Team and quarterly
reports taken to the service committees and the Finance and Resources
Committee.
Page 53 of 209

Page 54

2. Financial management | 17 
44.  We reviewed budget monitoring reports throughout the year. The projected
surplus increased as the year progressed. We concluded that budget
monitoring reports provided an overall picture of the budget position at service
level. The reports forecast the outturn position for the year and include good
narrative explanations for significant variances against budget. This allowed
both members and officers to carry out effective scrutiny of the council's
finances.
The Covid-19 pandemic resulted in 2021/22 costs of £68 million,
which were mostly funded by income
45.  The impact on public finances of the Covid-19 pandemic has been
unprecedented, with the Scottish and UK governments providing substantial
additional funding for public services as well as support for individuals,
businesses and the economy. It is likely that further financial measures will be
needed and that the effects will be felt well into the future.
46.  The council excluded the impact of Covid-19 from its 2021/22 budget when
it was initially set in March 2021, due to the level of uncertainty around costs
and levels of funding. A separate exercise was completed to consider Covid-19
funding and associated costs later in the year with the Covid Recovery Budget
presented to committee in September 2021.
47.  The Covid Recovery Budget covers the financial years 2021/22 and
2022/23. In 2021/22, net costs of £50.8 million and one-off investment of £7.9
million were forecast for Covid-19. Total budgeted resources were £68.1 million,
leaving £9.4 million to be carried forward and used in 2022/23.  
48.  The resources available for Covid-19 costs include Scottish Government
funding of £54 million, a general fund contribution of £6.5 million and other
council funding of £7.6 million. Net costs were budgeted based on information
from the Scottish Government’s most recent route map at the time.  Budgeted
costs included education recovery (£30.8 million), which largely relates to
investment in newly qualified teachers, and shortfall in council tax income (£1.5
million). The council's core budget was updated to include the Covid Recovery
Budget leading to a final budget of £874.7 million for 2021/22. 
49.  Covid-19 spend was tracked through the council’s budget monitoring
process with a separate appendix prepared in reports to the Corporate
Management Team showing Covid-19 related costs against income. Per
provisional outturn reporting, total Covid-19 expenditure in 2021/22 was £67.6
million, just £0.03 million different from the budget. Covid-19 income was £66.7
million, leaving net expenditure of just under £1 million. 
50.  The council continued to administer a number of grant schemes on behalf
of the Scottish Government. The council made grant payments of £17.2 million
in 2021/22. £4.8 million was paid for the Child Bridging Payment and a further
£2.8 million was administered by the council for the Retail and Hospitality top up
grant.  
Page 54 of 209

Page 55

2. Financial management | 18 
There has been a significant increase in the level of General
Fund reserves 
51.  One of the key measures of the financial health of a body is the level of
reserves held. The level of usable reserves held by the council increased from
£231 million in 2020/21 to £290 million in 2021/22. 
52.  The general fund is the largest usable reserve and is used to support the
delivery of services. The net general fund surplus for 2021/22 was £63 million
(excluding HRA), which is explained in paragraph 42 of this report.  
53.  Total general fund reserves now stand at £236 million and include £30.6
million of Covid-19 earmarked funding and £138.5 million earmarked for specific
future commitments such as early years and childcare expansion (£14.2
million), temporary accommodation (£9.3 million), energy costs/ other non-pay
inflation (£7.2 million) and pupil equity fund balance (£5.1 million). 
54.  The general fund also now includes a balance of £54 million held for future
contractual obligations of Public Private Partnership schools. This had
previously been recognised as an accrual in the financial statements, but as
disclosed in the management commentary, this balance is now correctly shown
as an earmarked element of the General Fund and is intended to match funding
and expenditure over the lifetime of the PPP contract.  This was accounted for
as a prior year adjustment and increased the opening general fund balance for
the year. 
55.  The unearmarked general fund balance of £40.7 million includes the
council’s £8 million contingency. This is held to provide cover for unexpected
expenditure and as a working balance to help cushion the impact of uneven
cash flows.  
56.  Exhibit 5 provides an analysis of the general fund and HRA over the last five
years and shows the significant increase in reserves over the last two years due
to surpluses, Covid-19 funding and revised treatment of the PPP funding
balance. The council advised this level of reserves is required to ensure it
remains financially sustainable over the medium term. 
Exhibit 5
Analysis of general fund balance 
Page 55 of 209

Page 56

2. Financial management | 19 
Source: North Lanarkshire Council Annual Accounts 2021/22
The council has a track record of delivering savings, but this is
becoming increasingly challenging
57.  In February 2020 the council approved a three-year savings programme of
£40 million, alongside the budget setting process. The budget set in March
2021 incorporated planned savings of £20 million. Savings plans included
reconfiguration of the secondary school week, a review of environmental asset
structures and savings from the Digital NL project. 
58.  The council achieved actual savings of £14.2 million (71% of this total),
leaving an in-year savings gap of £4.8 million with just under £1 million of these
recurrent savings. The shortfall was dealt with through alternative savings and
management action such as control of vacancies and curtailment of spending in
other areas.  
59.  The council has a track record of delivering savings but acknowledges the
increasing challenges in delivering some of the planned savings. The
challenging impact of Covid-19 and increasing prices and demand for certain
services have impacted on the achievement of savings. Services continue to
keep previously unachieved savings under review and identify alternative action
to manage the in-year impact and any potential recurring impact. 
60.  As illustrated in Exhibit 6, the council has delivered total cumulative savings
of £124 million since 2017/18. £102 million of these have been planned savings.  
Exhibit 6
Savings – planned savings achieved and those met through alternatives 
Page 56 of 209

Page 57

2. Financial management | 20 
Source: North Lanarkshire Council’s Annual Accounts 2017/18 to 2021/22
The council revised its Strategic Capital Investment Programme
61.  The council’s revised Strategic Capital Investment Programme for 2021/22
to 2025/26 was approved in March 2021. Since then, a number of challenges
have been encountered as a result of recovering from the pandemic and due to
Brexit affecting the availability of labour and raw materials. 
62.  These factors led to lower than planned expenditure and therefore lower
levels of borrowing. As a result, the council reprofiled delivery of the capital
programme across the remainder of the five-year capital planning period. The
revised Strategic Capital Investment Programme was approved at Policy and
Strategy Committee in March 2022.
Financial systems of internal control generally operated
effectively but we identified a number of areas for improvement
63.  Auditing standards require external auditors to obtain an understanding of
the accounting and internal control systems that exist within the audited body to
allow us to plan and develop an effective audit approach for the annual
accounts.
64.  Our 2021/22 testing covered key controls in a number of areas including
budget monitoring, payroll, journals, housing rents, council tax, non-domestic
rates and IT access. 
65.  We identified a number of areas where controls can be improved. See
Exhibit 7 for details of the key controls risks we identified. 
Page 57 of 209

Page 58

2. Financial management | 21 
66.  These findings impacted on our audit approach where we needed to carry
out additional work to enable us to obtain the required assurance for our audit of
the annual accounts.
Exhibit 7
Key findings from review of key controls
Audit finding Additional audit procedures
1. Payroll user access
The review of user access over iTrent was not
carried out as planned due to the constraints
arising from Covid-19 and the need to prioritise
service delivery. A review of access was
completed in January 2021, with the next review
scheduled for April 2022. This used to be a bi-
annual check. However, it will have been 15
months between the last check and the next
scheduled one in April 2022. This control is not
operating as expected.
There is a risk that individuals continue to
have inappropriate access to the payroll
system.
We substantively tested a sample
of users to ensure that access
permissions are appropriate.  
2. Payroll validation checks
We have previously reported this issue. Each
service is emailed periodically a list of all staff on
iTrent and include details of their latest pay. Line
managers are expected to review these staff
listings for any errors. A response is only
expected if there is an issue, therefore no positive
assurance is received.
There is a risk that staff remain on the payroll
after they have left.
We substantively tested an
extended sample of paid
employees to ensure they exist as
current employees through
confirmation to other records.
3. Non-domestic rates reliefs and council tax
discounts
Officers should take a sample of new reliefs (for
non-domestic rates) and new discounts (for
council tax) awarded each month and carry out
second officer checks. During 2021/22, these
checks only took place for the first six months of
the year.
Officers should complete annual reviews of those
with continuing reliefs or discounts to ensure they
should still be in receipt of these. There were four
We substantively tested an
extended sample of reliefs for non-
domestic rates and discounts for
council tax.
Page 58 of 209

Page 59

2. Financial management | 22 
Audit finding Additional audit procedures
categories of non-domestic reliefs where these
did not happen because of time constraints.
There is a risk that non-domestic rates reliefs
and council tax discounts are awarded
incorrectly.
Source: Audit Scotland 
Standards of conduct and arrangements for the prevention and
detection of fraud and error were appropriate 
67.   The council is responsible for establishing arrangements for the prevention
and detection of fraud, error and irregularities, bribery and corruption.
Furthermore, it is responsible for ensuring that its affairs are managed in
accordance with proper standards of conduct by putting effective arrangements
in place. 
68.  We have reviewed the arrangements and concluded that there are
appropriate arrangements for the prevention and detection of fraud, error and
irregularities.
69.  There are also established arrangements to maintain standards of conduct.
70.  The National Fraud Initiative (NFI) is a counter-fraud exercise across the
UK public sector which aims to prevent and detect fraud. The council has taken
a risk-based approach to the investigation of NFI matches. We considered that
the approach was appropriate and found that Internal Audit took an active role
in continuing to regularly report NFI activity to the Audit and Scrutiny Panel.   
Page 59 of 209

Page 60

3. Financial sustainability | 23 
3. Financial sustainability
Financial sustainability looks forward to the medium and long term to
consider whether the council is planning effectively to continue to
deliver its services or the way in which they should be delivered
Main judgements
Latest budget monitoring reports project a small surplus for 2022/23. 
The council has a well-developed medium-term financial plan. The council’s five-
year projections to 2027/28 forecast a cumulative funding gap of £109 million.   
Latest budget monitoring reports project a small surplus for
2022/23
71.  The General Fund Revenue Budget for 2022/23 of £887 million was
approved by the council in February 2022. This included spend which is offset
by ring fenced grants of £50 million resulting in an opening budget position for
Net Service Expenditure of £837 million. 
72.  Additional funding has since been confirmed with a revised budget of £875
million. Budget monitoring reports to July 2022, presented to the Finance and
Resources Committee, report a projected small surplus of £0.2 million against
this budget. The budget set for 2022/23 does not reflect the impact of inflation
and increased energy costs. 
73.  The budget includes £10.5 million of approved savings. However, the
overall savings target has been brought down to £7.1 million after taking
account of £3.4 million one-off resources set aside to manage the
implementation of savings. £5.2 million of the approved savings are expected to
be delivered within the financial year which is 73% of the reduced target.
74.  The current economic climate remains uncertain, with the continuing impact
of Covid-19 together with the added cost pressures from inflation and the cost-
of-living crisis. These will present significant challenges to financial planning
and the ability of the council to deliver quality services.  
The council has a well-developed medium-term financial plan
with a cumulative funding gap of £109 million
75.  The council has a five-year medium-term financial plan which informs the
rolling three-year budget setting process. The plan is updated annually and
forms the basis of the council’s savings plans. The plan includes a range of risk-
Page 60 of 209

Page 61

3. Financial sustainability | 24 
based outcomes which are presented over three scenarios: optimistic,
envisaged and pessimistic.
76.  An update to the medium-term financial plan was presented to the Policy
and Strategy Committee in September 2022 covering financial years 2023/24 to
2027/28. The council’s projections over the five years to 2027/28 forecast an
envisaged cumulative funding gap of £109 million. The envisaged cumulative
funding gap over the next three years is £75 million.
77.  The updated plan reflects an increase in the estimated pay award for
2022/23 which has still to be agreed. The previously assumed uplift for the pay
award was 2.5%, however the council has estimated that it will cost an
additional net 1% or 4.7 million. The Scottish Government continues to review
the potential for additional flexibilities to support councils fund the additional
cost of the pay award. Given there is still no agreement, the council plan reflects
an additional burden of £4.7 million. 
Page 61 of 209

Page 62

4. Governance and transparency | 25 
4. Governance and
transparency
The effectiveness of scrutiny and oversight and transparent reporting of
information 
Main Judgements
Governance arrangements operating throughout 2021/22 were appropriate and
operated effectively 
Improvements were made in performance reporting in the annual accounts
Governance arrangements operating throughout 2021/22 were
appropriate and operated effectively 
78.  We have previously reported on how the council adapted to the impact of
the Covid-19 pandemic and the changes it had to implement as a result. For
example, holding committee meetings remotely.
79.  In March 2022, the council approved a Covid Operating Model, in line with
Scottish Government guidance. This model provides a basis for the council’s
operations over the next six months whilst taking account of the ongoing risks
relating to the Covid-19 pandemic. 
80.  Our previous conclusion remains, we consider the governance
arrangements operating throughout 2021/22 were appropriate. These
arrangements help support effective scrutiny, challenge and decision making. 
Local Government elections led to a change in administration
before the Leader resigned and the previous administration
was reinstated
81.  The Local Government elections held in May 2022, and subsequent
meeting of the council, led to a change in council leadership from a minority
Labour administration to a minority SNP administration. However, following the
leader’s resignation in July 2022, a new leadership team was elected, resulting
in the return of a Labour administration. 
82.  This change in administration meant that the convenor of the Audit and
Scrutiny Panel reverted to a Conservative group member – and our concern
over whether this Panel was going to be overseen by a member of the
administration was resolved.
Page 62 of 209

Page 63

4. Governance and transparency | 26 
83.  New committee conveners were appointed in August 2022 with committee
meetings resuming from the end of that month. There has been a move to
hybrid meetings and the return of in person meetings held at the Civic Centre
for a number of committees. 
Improvements to performance reporting in the annual accounts
were identified 
84.  Our review of the management commentary against guidance, identified
some areas for improvement. For example, the unaudited accounts lacked
analysis of the council’s business using key performance indicators. These
should be used to demonstrate the performance of the council against its
strategy/objectives in a measured way. The accounts were subsequently
updated with performance information. 
The council’s continued reporting of Covid-19 agency costs
represents good practice 
85.  The Code of Audit Practice 2016 encourages auditors to identify good
practice which in their opinion is worth sharing more widely. As part of our work
on the annual accounts, we identified the reporting of covid agency costs and
funding as good practice. This disclosure is made in Note 12 to the accounts. 
Page 63 of 209

Page 64

5. Best Value | 27 
5. Best Value 
Using resources effectively and continually improving services.
Main judgements
Good progress has been made in addressing previous Best Value Annual Report
findings 
Good progress has been made in addressing previous Best
Value Annual Report findings
86.  Best value is assessed over the audit appointment, as part of the annual
audit work. In addition, a Best Value Assurance Report (BVAR) for each council
has been considered by the Accounts Commission at least once over the last
appointment round. The BVAR report for the council was published in May
2019.
87.  At its meeting in June 2019 the council agreed the recommendations within
the Best Value Assurance Report. Progress on the eight recommendations was
reported to the Policy and Strategy Committee in September 2019 and March
2020.  After that, recommendations have been mapped to the council’s
Programme of Work which underpins the overarching Plan for North
Lanarkshire vision. Progress on the recommendations is tracked through the
various updates on the Programme of Work which go to Committee.
88.  Exhibit 8 summarises our assessment of each of the outstanding
recommendations. This shows that good progress has been made on
progressing previous BVAR findings, with a further two recommendations
considered as complete. 
89.  The Controller of Audit will consider the results of this follow up work, and
report to the Accounts Commission on the extent of improvements made. 
Exhibit 8
Progress on Best Value Recommendations
BVAR Recommendation Summary of progress 
The council should
implement the recently
approved Performance
Management
Framework and
reporting schedule to
There were three pilot reports (Regulatory Services,
Financial Solutions and Business Solutions) which
were submitted to the respective service committees
in August/September 2021 in line with the indicators
in the Strategic Performance Framework. There is
alignment in these reports to the ambition statements
Page 64 of 209

Page 65

5. Best Value | 28 
BVAR Recommendation Summary of progress 
support the delivery of
the Plan for North
Lanarkshire and its
scrutiny by members.
in The Plan for North Lanarkshire Council. Feedback
from these pilots was positive from both Heads of
Service and Elected Members.
These pilots were then rolled out for six monthly
reporting thereafter in February/March 2022. Work is
underway to roll out this approach to all the other
Heads of Service areas, with a view to concluding
this development phase and all Heads of Service
having six monthly reporting in place for cycle four of
2022.
The original Strategic Performance Framework
(approved in September 2019) is currently
undergoing an update with Heads of Service
reviewing their indicators and setting targets and
thresholds for the next three years. The updated
Strategic Performance Framework will reflect the
updates to the SPI Direction published in December
2021. An update to the Strategic Performance
Framework is scheduled for later in the year as per
the Programme of Work.
Good progress has been made, with completion
expected later in 2022/23
The council should
investigate and better
understand the reasons
for falling satisfaction
levels within social care
and whether they can
apply learning from the
high satisfaction levels
in housing.
The Business Improvement Hub (BI Hub) is a
medium to long-term project. Phase three saw the
development of Service BI Hub elements within
Housing Solutions. Targeted dashboards have also
been developed together with a dashboard for
complaints performance indicators. These are linked
with the three levels of the Strategic Performance
Reporting Framework. 
Elected Members can now review dashboard
information and filter this down to ward level or
specific areas. In phase four of the development,
customer satisfaction information will be brought into
the BI Hub.
Limited progress has been made, with
satisfaction information still to be developed
Workforce plans should
be finalised to set out
the current and future
workforce requirements
of the council and
evidence how this
supports other
strategies.
All Heads of Service completed a workforce plan
which subsequently went to Corporate Management
Team in April 2022. These plans will be reported to
the Policy and Strategy Committee later in the year.
The workforce plans help to identify any gaps, any
barriers such as recruitment, as well as the next
steps over the longer-term.
Page 65 of 209

Page 66

5. Best Value | 29 
BVAR Recommendation Summary of progress 
Within the workforce plans, references are made to
other Strategies within the council, such as the Digital
and IT strategy to ensure these are fully supported
and integrated. Furthermore, all workforce plans also
refer to external drivers such as key agencies and
Internal/ External Audit recommendations to keep
plans on track.
This recommendation is considered complete
Improvement plans
arising from self-
evaluation exercises
should include
measurable actions
and clear deadlines.
Five self-evaluation exercises were carried-out in the
last year:
1. Data Governance Board
2. Risk governance arrangements Digital NL
3. CIPFA
4. Corporate Management Team
5. IJB - self-evaluation workshop
A sixth self-evaluation exercise has been concluded
for reporting to the Corporate Management Team by
the end of September 2022.  Furthermore, the
Strategic Self-Evaluation Framework and rolling
review programme will undergo an annual review and
update and will go for further review later in the year
to the Audit and Scrutiny Panel in line with the
Programme of Work.
Each self-evaluation identified improvement actions
which are captured in an improvement plan. These
improvement plans include improvement actions with
target dates and responsible officers identified.
This recommendation is considered complete
Source: Audit Scotland
Statutory performance indicators (SPIs) are being met
90.  The Accounts Commission has a statutory responsibility to define the
performance information that councils must publish. In turn, councils have their
own responsibility, under their Best Value duty, to report performance to the
public. The Accounts Commission does not prescribe how councils should
report this information but expects them to provide the public with fair, balanced
and engaging performance information.
91.  The Accounts Commission issued a revised Statutory Performance
Information Direction in December 2018 which continues to apply in 2021/22. It
requires a council to report: 
Page 66 of 209

Page 67

5. Best Value | 30 
• its performance in improving local public services provided by the
council (on its own and with its partners and communities), and
progress against agreed desired outcomes
• its own assessment and independent audit assessments of how it is
performing against its duty of Best Value, and how it plans to improve
these assessments
•  how it (with its partners where appropriate) has engaged with and
responded to its diverse communities
92.  We have evaluated the council’s arrangements for fulfilling the above
requirements and concluded that the council complies with the Direction. 
93.  The pandemic continued to impact on the council’s performance levels and
the availability of performance results. This led to challenges in ensuring regular
performance reporting was maintained.  Despite these challenges, the council
was still able to establish a series of performance reporting pilots.
94.  These pilots reaffirmed responsibilities for each of the service committees.
For each service area, suites of performance results are set out. Reporting of
progress against the council’s long-term vision is balanced with delivering on
what matters locally. The suite of performance indicators also included
information from a nationally developed Covid-19 data dashboard. This was
established so the council’s response to the pandemic could be monitored.
95.  We reported in 2020/21 that a new Business Intelligence Hub was being
created which will eventually be the primary way in which performance data is
collected and reported. Work continues on this project, and when complete
should allow for improved analysis of performance data. 
National performance audit reports
96.  Audit Scotland carries out a national performance audit programme on
behalf of the Accounts Commission and the Auditor General for Scotland.
During 2021/22, Audit Scotland published a number of reports were issued
which may be of interest to the body. These are outlined in Appendix 2.
97.  Relevant national reports continue to be presented to the Audit and Scrutiny
Panel throughout the year. This includes an assessment from management of
the council’s position against the recommendations contained in the reports. 
Page 67 of 209

Page 68

Appendix 1. Action plan 2021/22 | 31 
Appendix 1. Action plan
2021/22 
2021/22 and prior year (b/f) recommendations
Issue/risk Recommendation  Agreed management
action/timing
b/f 1. Non-current asset
valuations
Our review identified that as a
result of the council’s policy
to revalue assets every five
years there is a risk that the
valuation of major asset
classes (e.g. education estate
and council dwellings) may
have changed materially
since their last full valuation.
Although in line with previous
practice, some valuations had
not been updated for three
years on major asset classes
(school buildings and
housing) and no assessment
was undertaken to determine
if these asset values differed
materially from current value.
Risk – There is a risk that
non-current asset carrying
values are significantly
different to the current value.
The council should assess
annually whether the carrying
value of assets is materially
different from current value.
Substantially complete 
At 31 March 2022, the council
applied an adjustment of
£289.9 million based on a
desktop review of BCIS
rebuild costs to reflect
estimated material
movements in current value
since the last valuation. 
Refer to Exhibit 2
The impact of higher inflation 
on rebuild costs may indicate
that the council’s five-year
approach to full revaluation
may no longer be
appropriate, despite the
annual desktop exercise
carried out to make an
assessment of any material
change in value. We
recommend that the council
reviews its rolling approach to
asset revaluation over 5
years.
Management response:
The Council will undertake a
review of its current 5-year
revaluation programme in
light of the current economic
climate and inflationary
impacts.  It is intended that
this will be subject to early
discussions with the Audit
Page 68 of 209

Page 69

Appendix 1. Action plan 2021/22 | 32 
Issue/risk Recommendation  Agreed management
action/timing
Lead and any further
guidance issued.  
Elaine Kemp
30 June 2023
b/f 2. Non-current asset
accounting
A review of the fixed asset
register identified various
errors in the useful lives of
assets, depreciation, and net
book value of assets. 
Risk – There is a risk that
assets will be incorrectly
accounted for in the financial
statements.
The council should complete
a detailed quality review of its
fixed asset register at each
year end to identify any errors
which could feed into the
financial statements.
Substantially complete
A review of the revaluations
working paper was completed
by officers at the year end,
however in 2021/22 audit
review identified issues with
asset classification between
Assets under construction
and completed assets.
We recommend that
processes are revised to
review classification of
assets.
Management response:
The Council will include a
review of asset classifications
within the annual fixed asset
review process in order to
identify and correct any
classification errors.  
Elaine Kemp 
30 June 2023  
b/f 3. Internal controls
Due to the additional
workload on the revenues
team as a result of the Covid-
19 pandemic and
administering the business
grants, second officer checks
over council tax and non-
domestic rates reliefs were
paused in 2020/21.
Risk – There is a risk that
reliefs and discounts are
awarded incorrectly.
The council should ensure
these second officer checks
over non-domestic rates and
council tax reliefs are
reinstated.
Outstanding 
During 2021/22, these checks
only took place for the first six
months of the year. 
Annual reviews of those with
continuing reliefs or discounts
were not conducted in four
categories of reliefs. 
The council should ensure
second officer checks are
completed throughout the
year for a sample of new and
continuing reliefs and
Page 69 of 209

Page 70

Appendix 1. Action plan 2021/22 | 33 
Issue/risk Recommendation  Agreed management
action/timing
discounts across all
categories. 
Management response:
Sample second officer
checks on new reliefs /
discounts have been
reinstated during 2022/23
and will continue to be
actioned.
Elaine Kemp
No further action
b/f 4. User access
Each financial system has
controls in place for staff to
gain appropriate
access.  There are also
processes in place to monitor
user access through annual
or bi-annual reviews.  For
each of the financial systems
reviewed, with the exception
of e-Financials, these reviews
did not take place in
2020/21.  However, Internal
Audit’s review of general
ledger controls found the
documentation for the e-
Financials review to be
incomplete and an exercise is
underway to follow up on any
documentation
outstanding.  We also note
that for the iTrent system
there was a review of
dormant users during the
year.  
Risk – There is a risk that
individuals may have
inappropriate access to
systems.
The Revenues and Benefits
bi-annual User Review was
delayed due to the impact of
Covid 19 on Service
Delivery.  The potential
increased risk of
inappropriate access was for
a limited period only with the
full User Review programme
re-initiated in May 2021 with
the overall process due to be
fully completed by quarter
three. 
Responsible Officer: Paul
Doherty 
December 2021 
Partially complete
The planned reviews were
completed across all systems
with the exception of the
payroll system iTrent.
Therefore the risk remains for
this system.
Refer to Exhibit 9 for further
details.
Management response:
iTrent review completed
August 2022. Not sufficient
resource to complete more
than annually at present.
Alternative options will be
pursued to increase review
timeframe. 
William Cunningham 
April 2023
b/f 5. Payroll – validation
checks
We reported last year that
employee validation checks
Positive validation reports
have been implemented for
Education and Families and
Partially complete
Positive validation reports
have been implemented and
we concluded that the control
Page 70 of 209

Page 71

Appendix 1. Action plan 2021/22 | 34 
Issue/risk Recommendation  Agreed management
action/timing
are now carried out by payroll
across all council
services.  However, this
process is still considered
incomplete as it does not
require positive confirmation
that the employee listing is
correct. We note that positive
confirmation was
implemented for the
Education service towards
the end of 2020/21 and has
been rolled out to all council
services from May 2021.  
Risk – There is the risk that
the absence of a periodic
validation of all staff through
positive confirmation of
employment staff remain on
the payroll after they have left
employment.
this exercise will be repeated
on a yearly basis. 
Positive validation for all
other services will be
undertaken in July 2021 and
yearly thereafter. 
Responsible Officer:
Jennifer Hardy, Employee
Service Centre Manager 
July 2021 
is now operating as intended.
However, this is a slow cycle
with one or two services
being reviewed each year.
Therefore it is important the
council takes forward the
employee listing control and
receives positive assurance
for this.
Refer to Exhibit 9 for further
details.
Management response:
Employee validation checks
are carried out on a service-
by-service basis. A positive
response is required to
validate information, and this
is logged, tracked and
checked by the HR Audit and
Compliance Team, this is a
labour-intensive process,
however the intention is to
carry out employee validation
checks for each service and
this will be repeated each
year for each service on a
rolling basis. These checks
are supplemented by a
monthly structure report that
is sent to managers to
highlight any anomalies.
Yvonne Doyle 
July 2023    
Page 71 of 209

Page 72

Appendix 2. Summary of 2021/22 national reports and briefings | 35 
Appendix 2. Summary of
2021/22 national reports and
briefings 
May
Local government in Scotland Overview 2021
June
Covid 19: Personal protective equipment
July
Community justice: Sustainable alternatives to custody
September
Covid 19: Vaccination programme
January
Planning for skills
Social care briefing
February
NHS in Scotland 2021
March
Local government in Scotland: Financial Overview 20/21
Drug and alcohol: An update
Scotland’s economy: Supporting businesses through the Covid 19 pandemic 
Page 72 of 209

Page 73

Appendix 2. Summary of 2021/22 national reports and briefings | 36  
North Lanarkshire Council
Draft 2021/22 Annual Audit Report 
Audit Scotland’s published material is available for download 
on the website in a number of formats. For information on our 
accessibility principles, please visit:
www.audit-scotland.gov.uk/accessibility
For the latest news follow us on social media or
subscribe to our email alerts. 
Audit Scotland, 4th Floor, 102 West Port, Edinburgh EH3 9DN
Phone: 0131 625 1500 Email: info@audit-scotland.gov.uk
www.audit-scotland.gov.uk
AS.4.0 
Page 73 of 209

Page 74

Page 74 of 209

Page 75

North Lanarkshire Council
Report
Audit & Scrutiny Panel 
Does this report require to be approved? ☐ Yes   ☒ No
Ref;EK/KS/VR   Date 27/10/22 
Annual Accounts 2021/22 (Audited) 
From  Elaine Kemp, Head of Financial Solutions  
E-mail KempE@northlan.gov.uk Telephone
07939280601 
1. Background
1.1. The Local Authority Accounts (Scotland) Regulations 2014 require the Council to
prepare an annual Statement of Accounts in accordance with proper accounting
practices. These regulations also required that, as committee of the authority whose
remit includes audit or governance functions, the Audit and Scrutiny Panel meet to
consider the audited annual accounts with the aim to approve these for signature and
to publish these by 31st October immediately following the financial year to which they
relate.
1.2. The Audit Commission appoint external auditors to local authorities in order to carry out
the audit of financial statements in accordance with International Standards on
Auditing.
Executive Summary
The purpose of this report is to present the Council’s final 2021/22 Annual Accounts, and
provide Members with the background on the need to consider matters raised by Audit
Scotland in respect of their examination of the accounts.
Recommendations
The panel is invited to:
(1) Note the contents of this report;
(2) Approve the attached final accounts for signing; and
(3) Consider the relevant matters raised by the external auditor at the Panel meeting
of 27 October 2022 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
AGENDA ITEM 5
Page 75 of 209

Page 76

2. Report
2.1. The review of the 2021/22 accounts by Audit Scotland is now complete with the final
version of the accounts attached to this report.
2.2. Following consideration of the accounts at this meeting, a copy of the final accounts
signed by Council officers and the Audit Director will be submitted to Audit Scotland.
2.3. A full Annual Report has been prepared by Audit Scotland and forms part of this
meeting’s agenda. 
3. Measures of success
N/a 
4. Supporting documents
Appendix 1 Audited Annual Accounts 2021/22 
Elaine Kemp
Head of Financial Solutions 
5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Page 76 of 209

Page 77

Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact
Is there a risk impact?
Yes ☐ No ☒
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
Page 77 of 209

Page 78

Page 78 of 209

Page 79

ANNUAL ACCOUNTS 
2021-2022
Page 79 of 209

Page 80

Page 80 of 209

Page 81

Annual Accounts 2021/22
Contents 
Management Commentary 1
Statement of Accounts 
Comprehensive Income and Expenditure Statement 17
Balance Sheet 18
Movements in Reserves Statement 19
Cash Flow Statement 21
Notes to the Accounts 
1 Accounting Policies 22
2 Expenditure and Funding Analysis 33
3 Accounting Standards that have been Issued but not yet Adopted 34
4 Critical Judgements in Applying Accounting Policies 35
5 Assumptions Made About the Future and Other Major Sources of Estimation
Uncertainty
35
6 Events After the Balance Sheet Date 37
7 Restatement 37
8 Other Operating Expenditure 37
9 Financing and Investment Income and Expenditure 38
10 Taxation and Non-Specific Grant Income 38
11 Grant Income 39
12 Agency Services 40
13 Property, Plant and Equipment 41
14 Heritage Assets 43
15 Intangible Assets 45
16 Long-Term Debtors 45
17 Financial Instruments 45
18 Inventories 54
19 Short-Term Debtors 54
20 Cash and Cash Equivalents 54
21 Short-Term Creditors 55
22 Provisions 55
23 Contingent Assets and Liabilities 55
24 Leases 57
25 Public Private Partnerships and Similar Contracts 57
26 Pension Costs 59
27 Usable Reserves 64
28 Unusable Reserves 67
Page 81 of 209

Page 82

Annual Accounts 2021/22
Contents 
29 Capital Commitments  70
30 Capital Expenditure and Capital Financing 71
31 Adjustments between Accounting Basis and Funding Basis under
Regulations
72
32 Transfers to/from Statutory Reserves 74
33 Reconciliation of Comprehensive Income and Expenditure Statement to
Cash Flow Operating Activities
75
34 Reconciliation of Financing Activities to Balance Sheet 75
35 External Audit Costs 75
36 Statutory Trading Operations 76
37 Related Parties 76
Housing Revenue Account 79
Council Tax Income Statement 80
Non Domestic Rates Income Statement 81
Sundry Accounts Statement 82
Group Comprehensive Income and Expenditure Statement 83
Group Balance Sheet 84
Movements in Group Reserves Statement 85
Group Cash Flow Statement 87
Notes to the Group Accounts 
1 Disclosure of Interest in Other Entities  88
2 Group Structure 88
3 Combining Entities 90
4 Changes to Group Structure 90
5 Principal Place of Business 90
6 Reconciliation Statements 91
7 Further Details on Consolidation 92
8 Interests in Other Entities 95
Remuneration Report 96
Statement of Responsibilities 106
Annual Governance Statement 107
Independent Auditor’s Report 118
Glossary of Terms 123   
Page 82 of 209

Page 83

Annual Accounts 2021/22
Management Commentary 
- 1 -
Introduction 
North Lanarkshire is Scotland’s fourth largest local authority area by population.  It is ideally situated in the heart
of Scotland with first-rate connectivity to the rest of Scotland, the UK, and the world.  As the fifth most densely
populated council area, North Lanarkshire is divided into 21 wards which are represented by 77 elected
members.  The Council is the main provider of services to the growing population of 341,140 residents and those
who come to live, learn, work, invest and visit. 
Background 
The Annual Accounts demonstrate the stewardship of the public funds with which the Council is entrusted. The
financial statements represent the financial position of North Lanarkshire Council as at 31 March 2022. They
have been compiled in accordance with the Code of Practice on Local Authority Accounting in the United
Kingdom which is based on International Financial Reporting Standards (IFRS). The Accounts also reflect the
requirements of accounting and statutory guidance set by the Government. IFRS is a set of accounting
standards developed by the independent, not-for-profit organisation, the International Accounting Standards
Board (IASB) in order to provide a global framework and general guidance to allow organisations to prepare and
disclose financial statements. 
Comprehensive Income and Expenditure Statement (CIES) 
The CIES (page 17) sets out the day-to-day operational expenditure incurred by each Council service and the
level of income received to support that service provision. It includes cash payments made in the provision of
services and payments to employees, and non-cash expenditure including depreciation and accrued
expenditure representing the cost of goods or services received by the authority by 31 March, for which payment
has not yet been made. It also reflects all sources of income received, and accrued in the year representing
income due as at 31 March but not yet received. 
The CIES shows the accounting position before statutory adjustments are applied. It analyses income and
expenditure in line with the organisational structure against which performance has been monitored throughout
the year.   
There is a Net Cost of Services of £863.095m and other corporate charges totalling £46.807m. These were
funded by Taxation and Non-Specific Grant Income (including Council Tax, General Revenue Grant and Non
Domestic Rates) of £891.091m. This resulted in an accounting deficit on the provision of services for the year
of £18.811m.
Other net income not related to the provision of services totalling £584.388m is also reported, resulting in the
Total Comprehensive Income and Expenditure for the year showing a surplus of £565.577m. This is an increase
of £428.178m from the position reported in 2020/21, primarily due to a reduction in the actuarial valuation of the
Council’s share of pension scheme liability, and which has been partially offset by an increased surplus on
revaluation of non-current assets. 
Movement in Reserves Statement (MiRS) 
The MiRS statement (page 19) shows the movement in year on both usable and unusable reserves held by the
Council, as a result of the Council’s performance, accounting adjustments and statutory adjustments. Reserves
represent the authority’s net worth and show its spending power. The key figure in the Accounts is the General
Fund balance. The credit balance in the General Fund is the excess of income over expenditure in the revenue
account, after adjusting for movements to and from reserves and other non-cash items such as depreciation.
When account is taken of those items excluded from the Comprehensive Income and Expenditure Statement,
the overall surplus on the General Fund Account for the year is £63.342m. 
The net General Fund surplus brought forward from 2020/21 has been restated from £116.751m to £162.181m
to reflect the change in presentation in respect of the balances held for future costs of PPP Schools, as discussed
and agreed with Audit Scotland.  In addition, an adjustment to the opening General Fund balance of £10.741m
has been made to recognise the opening balances transferred from the insourcing of Culture Leisure North
Lanarkshire, this results in the overall surplus to be carried forward into 2022/23 of £236.264m.  This balance
has increased over recent years largely due to funding in respect of COVID-19, some of which is being carried
forward for future obligations, as well as proactive management within the Council to maximise reserves to
support future budget challenges and to help ensure the delivery of Council services is financially sustainable. 
The overall balance is represented by:
Page 83 of 209

Page 84

Annual Accounts 2021/22
Management Commentary 
- 2 - 
£m £m
Earmarked COVID Funding 30.551 
Earmarked for Service Expenditure 138.536 169.087
Change Management Fund  29.424
Contingency  8.000
Unallocated  29.753
Total General Fund Balance  236.264   
Expenditure and Funding Analysis 
The Expenditure and Funding Analysis (Note 2 page 33) shows how expenditure is incurred and funded from
resources (government grants, housing rents, Council Tax and Non-Domestic Rates) in comparison with those
resources consumed or earned by the Council in accordance with generally accepted accounting practices. It
also shows how this expenditure is allocated across Council Services. Income and expenditure accounted for
under generally accepted accounting practice is presented more fully in the Comprehensive Income and
Expenditure Statement. 
Housing Revenue Account 
The Council is required by statute to maintain a separate Housing Revenue Account, as distinct from the General
Fund Revenue Account. The movements in the Housing Revenue Account are outlined in the Movement in
Reserves Statement (page 19), with the Housing Revenue Account financial statements detailed on page 79
These reflect transactions linked to managing the Council’s housing stock. The account shows an in-year deficit
of £7.957m, which when deducted from the 2020/21 balance brought forward results in a cumulative surplus of
£19.496m, shown within the Council’s Usable Reserves. Of this surplus, £12.871m has been approved for
specific purposes including Council Ambition of £5.054m, housing repairs £2.500m and HRA capital energy
efficiency programme of £2.500m. In addition, there is an approved £1.470m contingency reserve, which leaves
an unallocated balance of £5.155m. 
The opening 2021/22 equal pay provision included £0.123m in relation to the Housing Revenue Account. There
was £0.004m charged to the provision during the year, no further changes were deemed necessary, resulting in
a £0.119m balance carrying forward to 2022/23. 
Capital Account 
Details of Capital Expenditure and Capital Financing are shown on page 71. Total gross expenditure for Housing
and General Fund Services amounted to £171.195m. This was funded as summarised below: 
£m
Sale of Council Assets 1.014
Contributions from Revenue Budgets 34.262
Donated Assets 0.929
Capital Grants and Other Income 62.828
Loans Fund Advances 72.162  
171.195   
The 2021/22 loans fund advance of £72.162m was funded primarily from a combination of internal cash
balances/reserves and short-term borrowing in lieu of future long-term borrowing from the Public Works Loan
Board (PWLB). 
In response to the COVID-19 health crisis, a revised Strategic Capital Investment Programme was developed
by the Council’s Strategic Capital Delivery Group with the revised plan for 2021/22 to 2025/26 approved at the
Policy and Strategic Committee in March 2021. Financial year 2021/22 was the first year of the Council’s
approved programme. 
Page 84 of 209

Page 85

Annual Accounts 2021/22
Management Commentary 
- 3 - 
During 2021/22 the Council’s Strategic Capital Investment Programme faced a number of delivery challenges
linked to the ongoing impacts of recovery from COVID-19 and Brexit on industries such as construction and
transport linked to the availability of labour and raw materials. These resulted in reduced capacity for external
contractors to deliver projects within previously assumed timelines, increased material costs and changes in the
scope and timing of programmes in response to COVID-19 and Brexit. The overall impact meant that lower than
anticipated expenditure, and resultant borrowing, was incurred in delivering the capital programme with the
programme delivery reprofiled across the remainder of the five year capital planning period. The revised
Strategic Capital Investment Programme was approved at Policy and Strategy Committee in March 2022.     
Cash Flow Statement 
The Council’s cash and cash equivalent balance (detailed on page 21) increased by £3.445m during 2021/22.
This represents a net cash inflow from operating activities of £175.690m, a net cash outflow in investing activities
of £117.106m and a net cash outflow from financing activities of £55.139m with a further non cash adjustment
of £0.030m in respect of accrued interest made to the closing cash and cash equivalents, giving a closing cash
and cash equivalents balance of £114.256m.   
Long-Term Borrowing 
The Council’s annual borrowing strategy is outlined within the Treasury Management Strategy.  The strategy
considers the affordability of the capital financing requirement per the capital investment plan developed to
deliver on the Plan for North Lanarkshire. 
The Council’s Treasury Strategy and Treasury and Prudential Indicator  limits for 2021/22 were approved by the
Finance and Resources Committee on 11 March 2021. These facilitate the decision-making processes in
support of the Council’s capital investment and borrowing strategies. Significant capital investment was initiated
through the arrangements available within the Prudential System for Capital Finance. During 2021/22 the
approach to borrowing was in line with the approved strategy, with the Council taking advantage of long-term
and temporary (short-term) borrowing available at attractive rates supplemented by internal cash balances to
support principal repayments, daily revenue account requirements and the capital financing requirement. The
strategy adopted reflected interest rate forecasts, the management of carrying costs and the retention of cash
balances at appropriate levels managing the associated investment, interest and liquidity risk. 
Further detailed information and narrative on the Council’s future capital investment plans, treasury management
(borrowings and investments), prudential indicators and loans fund liabilities is contained within the Treasury
Management Strategy document. 
Pension Assets and Liabilities 
The IAS19 calculation (pages 59 to 63) for employers participating in the Strathclyde Pension Fund is based on
a snapshot valuation as at 31 March 2022. The value of the pension funds is fully assessed every three years
with annual estimates made between assessments. A range of factors are taken into account each time, such
as inflation and life expectancy. Therefore annual estimates of fund values and future pension payments can
vary from year to year.  The triennial review applied to 2021/22 took place as at 31 March 2021 with no change
to the employer’s contribution which remains at 19.3%.  The latest funding position as at 31 March 2021 is 106%
compared to the previous triennial review position at March 2017 of 105%.  The improvement is explained as
being a result of better than anticipated investment returns on the Fund’s assets and changes in future inflation
expectations. 
The liabilities show the underlying commitments that the Council has in the long run to pay retirement benefits.
The total net liability of £156.156m (page 61) has a significant impact on the net worth of the Council as recorded
in the Balance Sheet.  However, the deficit on the local government pension scheme will be made good by
contributions over the remaining working life of employees, as assessed by the scheme actuary. 
The estimated fair value of the fund's assets has increased by £333.115m as shown in note 26.3 and the
estimated fair value of future liabilities has increased by £72.081m as shown in Note 26.2, which together result
in a net decrease in liability of £261.034m. This reflects updated assumptions on a number of variables by the
pension actuaries.   
Page 85 of 209

Page 86

Annual Accounts 2021/22
Management Commentary 
- 4 -
Group Accounts 
The Council has a controlling interest in a number of companies and joint ventures. The Code of Practice on
Local Authority Accounting requires, where significant, the Council to include summary Group Accounts within
the Annual Accounts, showing the financial position of the Council and its subsidiaries plus the investments in
associates and interests in joint ventures as a single economic entity. 
After consolidation the Group balance sheet shows net assets of £2,454.366m as at 31 March 2022, an increase
of £184.252m on the single entity position, representing the Council’s share of the net assets of these entities.  
Further detailed information on the Group performance, along with the summarised group financial statements,
is available on pages 83 to 95. 
A brief summary of in year activity in respect of Council Arm’s Length External Organisations (Council companies
& joint venture companies) is provided below: 
Services previously provided by Culture and Leisure NL (CLNL) Ltd were successfully insourced to the Council
on 1 April 2021.  At that point, CLNL Ltd ceased to provide services and frontline service provision was carried
out directly through the Council’s Active and Creative Communities and Asset and Procurement Solutions
(Community Facilities) functions. CLNL Ltd is now in the process of being dissolved. 
Routes to Work Ltd continues to operate under a Service Level Agreement to support key parts of the Council’s
employability programmes including No One Left Behind, Parental Engagement Support Fund, Young Person
Guarantee and Prospects. Their services play a major role in ensuring employability support is available for
unemployed and underemployed residents of North Lanarkshire.  In addition, the arrangements during 2021/22
have ensured continued support for the Education and Families Pathways Programme for school leavers,
enhanced support for 16-24 year olds with specific barriers or underrepresentation in the labour market and
tailored support to cover over 50s, BAME community and Community Justice clients. 
Amey Public Services (APS) LLP continued to successfully deliver its full contractual responsibilities during
2021/22, whilst adhering to Scottish Government and Construction Scotland work restrictions and safety
guidance relating to COVID-19. The company have continued to perform well throughout the year and have
successfully exceeded their forecast turnover and profit margins. 
During the initial lockdown MEARS operations were restricted to emergency and essential services only. The
key partner worked with the Council on a Defined Service Agreement to facilitate company trading on a no-
profit/no-loss basis. This agreement came to an end in June 2021. Since then MEARS has continued to face
ongoing challenges in the trading environment both as a result of COVID-19 related absences and working
conditions and wider economic impacts on the price and availability of materials. MEARS continues to work in
partnership with the Council to discuss and resolve these issues, where possible. 
North Lanarkshire Properties (NLP) LLP the Covid-19 pandemic continued to provide a demanding and
challenging operational environment for NLP during 2021/22.  In particular, the ending of the Furlough scheme
and withdrawal of other business support put pressure on tenants’ ability to continue to trade.  NLP continued
to focus on recovery of rental income by engaging with tenants, agreeing repayment plans where appropriate
to minimise the impact and potential loss of income.  As a result, the company have continued to perform well
throughout the year and have over-achieved against their projected rental collection targets. 
Following an anti-money laundering and financial crime compliance review undertaken by the Royal Bank of
Scotland in October 2021, the Board of North Lanarkshire Municipal Bank Ltd considered the various issues,
challenges and implications in continuing to provide banking services, and agreed to cease services and take
the necessary steps close the bank.  This decision was ratified by the Council’s Policy and Strategy Committee
in October 2021.  A working group has been set-up to take forward the closure plan and ensure all operation,
legal and governance requirements are met.  The Council has agreed to provide assistance from Financial
Solutions, Strategic Communications and Legal & Democratic Solutions to progress. The closure process is
underway including the preparation of a detailed wind-up delivery plan and timeline, with a proposed dissolution
date of 30th September 2022.  The plan gives due consideration to provision of support to customers during the
transition period.   
Fusion Assets Ltd has continued with its development plans utilising Vacant & Derelict Land Fund funding and
internal resources to progress current and future developments, as well as finalising the successful sale of its
Newhouse A2 site for the development of a new Co-op distribution depot bringing investment and jobs to the
local economy. The Board of Directors continue to closely monitor the economic effects of the pandemic,
Page 86 of 209

Page 87

Annual Accounts 2021/22
Management Commentary 
- 5 -
however the industrial sector, which is Fusion Assets’ primary business area, remains relatively strong with
demand for distribution warehousing continuing to grow. 
Equal Pay 
The Council has previously recognised the need to provide for on-going commitments arising from equal pay
compensation claims.  The provision is reviewed annually with consideration given to the scale and scope of
any risk and uncertainties. 
The 2021/22 opening provision value of £5.606m comprised of £5.483m in relation to General Fund and
£0.123m for HRA.  Total claims paid out during 2021/22 equated to £0.558m in total.  The existing level of
provision was assessed and concluded to be reasonable to cover the remaining outstanding claims and the
expected pension cost for previously settled claims. Note 22 on page 55 provides the detail of the 2021/22
closing provision for Equal Pay of £5.048m. 
Political Composition and Council Structure 
The Council is overseen by 77 elected members as at the balance sheet date.  The political composition of the
elected members for North Lanarkshire Council is shown below: 
The Local Government elections held in May 2022 and subsequent meeting of the Council led to a change in
Council leadership from a minority Labour administration to a minority SNP administration. However, following
the leader’s resignation in July 2022, a new leadership team was elected, resulting in the return of a Labour
administration. At the Council meeting of 11 August 2022 Councillor Logue was appointed as Leader of the
Council and Councillor Kelly was appointed Depute Leader of the Council at a subsequent Council meeting
on 15 August 2022, it was agreed that Councillor Duffy be appointed as Provost, and Councillor Burgess as
Depute Provost.
Further information on the political composition of the Council, Committee membership and Councillors is
available on the Council’s website or Councillor Information System (CoInS).  
34
32
5 4 1 1
Scottish National Party
Scottish Labour Party
Scottish Conservative and
Unionist
Independent
British Unionists
Scottish Greens
Page 87 of 209

Page 88

Annual Accounts 2021/22
Management Commentary 
- 6 -
The Council’s reporting structure during 2021/22 is illustrated in the diagram below and is reflected in the
Financial Statements. 
Since the approval of the long-term vision for North Lanarkshire through We Aspire - a Shared Ambition for North
Lanarkshire (in September 2018), significant progress has been made towards realising inclusive growth and
prosperity for all.  The Policy & Strategy Committee approved the Delivering for Communities report in December
2020, setting out proposals for a future operating model and the required next stages of structural realignments
to further support the delivery of the shared ambition. Evolution of the Council’s senior management structure is
required to align these roles with the Community Board model and support this evolution, while recognising the
challenges and changes accelerated by the coronavirus pandemic and its impact on communities across North
Lanarkshire. The new approved organisational and reporting structure, was implemented from 1 April 2022. 
The Plan for North Lanarkshire and Programme of Work 
The Plan for North Lanarkshire, launched in 2019, established the long-term vision for North Lanarkshire which is
centred around a place based strategy that provides a clear future vision for the area in terms of achieving
inclusive growth and prosperity for all, and making North Lanarkshire the place to Live, Learn, Work, Invest, and
Visit.  This also provides a very clear focus and compelling narrative of what the Council (and partners) is working
towards.
The vision has been shaped by the area’s demographic, social, and economic profile. An update on this profile is
presented to the Policy and Strategy Committee annually through the suite of indicators designed to provide a
high-level impact assessment of the work of the Council and partners on North Lanarkshire’s economy, its people,
and its communities. This suite of indicators collectively provided the North Lanarkshire context and therefore the
context within which the Council delivers its portfolio of programmes, projects, and plans.
Delivery of these programmes, projects, and plans was further realised during the year following Committee
approval in March 2020, through the Programme of Work for 2021/22. In this respect a wide range of reports have
been presented to their respective Committees throughout 2021/22 in line with the approved Programme of Work
timetable. This has enabled Elected Members to review progress in the delivery of the ambitions outlined in The
Plan for North Lanarkshire.  This includes oversight of the next phase of delivery for integrated investment (through
The Place The Vision) in respect of town centre and community regeneration, town and community hubs, schools
new build programme, and parks master planning, as well as the associated active travel plans.  This next phase
has been informed through a programme of public engagement which enabled feedback on the potential locations
Page 88 of 209

Page 89

Annual Accounts 2021/22
Management Commentary 
- 7 -
for town hubs as well as the concepts and ideas being proposed within the Town Visions to ensure they truly
reflect future community needs.  Proof of concept work also commenced for a unified leadership and operational
model to support a much wider integrated community offer - with communities having more direct access to the
services they need and staff closer to the communities they work in.  This unified approach aims to put
communities at the heart of the Council’s operating model and seeks to ensure everyone is given equality of
opportunity and individuals are supported, encouraged, and cared for at each key stage of their life.
Annual review and evaluation work highlighted the successes achieved from the Programme of Work for 2020/21,
which were reported to the Policy and Strategy Committee in March 2022. This summarised some of the
achievements from the Programme of Work 2020/21 that have been instrumental in both supporting the long-term
vision and intentions laid out in The Plan for North Lanarkshire and demonstrating the extent of the response
locally to the COVID-19 pandemic in terms of maintaining the provision of critical frontline care, supports, and
services, and enabling the ongoing safety and wellbeing of service users and staff. The fourth annual iteration of
the Programme of Work (for 2022/23) was approved in March 2022.
An update of the Strategic Policy Framework in March 2022 has ensured that strategy and policy continue to
support the Council’s strategic planning framework and remain connected to delivery in order to collectively
facilitate a co-ordinated approach to identifying the resources and working practices, needed to support delivery
of the long-term vision.
The evidence through the latest results for a suite of indicators that provide the North Lanarkshire context, which
was reported in March 2022, suggest there is a danger that already unacceptably high levels of deprivation and
child poverty have become further exacerbated due to the impact of the pandemic, and there are also very real
challenges facing the future sustainability of the local economy.  Mindful of the current demographic, social, and
economic profile - which is set against a backdrop of significant financial challenges to come for local government
- a management commitment was made in the Programme of Work report to Committee in March 2022.  This
commitment set out the intention during 2022/23 to fundamentally evaluate activities undertaken, resources
expended, and results achieved against the direction of travel in order to assess the impact towards achieving
the ambition of inclusive growth and prosperity for all.
Strategy & Performance
Key to assessing the success of The Plan for North Lanarkshire and monitoring delivery of the Programme of
Work (while ensuring each stage of delivery towards achieving the overall ambitions is appropriately planned,
guided, implemented, and governed) are six inter-related corporate frameworks:
• Strategic Policy Framework
• Strategic Governance Framework
• Strategic Self-Evaluation Framework 
• Strategic Performance Framework
• Project Management Framework
• Framework for Demonstrating Improved Outcomes for Communities 
To ensure these frameworks remain aligned to The Plan for North Lanarkshire and Programme of Work, all are
on an annual review and refresh programme. This also helps the Council to ensure it is proactive in
responding to social, economic, and environmental trends and changes in legislation and governance, as well
as the broad range of national policy changes and new developments.  
The pandemic continued to impact on the Council’s delivery of planned day to day activities and achievement
of strategic priorities, which was reflected in subsequent levels of performance and availability of performance
results to ensure regular performance reporting on key strategic and operational performance measures. 
Notwithstanding this, a series of performance reporting pilots were established which reaffirms responsibilities
for service committees and set out suites of performance results for each service area and balanced reporting
between progress against the Council’s long-term vision and delivering on what matters today locally.  Trends
from previous years performance results were presented to enable an assessment of the impact of the pandemic
on the delivery of council services over time.  The suite of performance indicators also included information from
a nationally developed COVID data dashboard, set up to enable important aspects of the Council’s response to
the pandemic to be monitored.  This also means that the suite of performance information presented reflects as
full and complete a picture of service performance as possible.
The Council’s Strategic performance is reported against 28 health check indicators and are used to inform the
strategic planning process going forward.  The suite of indicators aims to provide a high-level impact assessment
of the work of the Council and partners on North Lanarkshire’s economy, its people, and communities. The suite
comprises a small number of wider landscape measures which focus, where possible, on outcomes rather than
outputs, are sourced externally to provide external verification, and are available nationally to enable a
Page 89 of 209

Page 90

Annual Accounts 2021/22
Management Commentary 
- 8 -
comparison of performance and progress. The most recent data published can be found in appendix A-1 of the
following report: The Plan for North Lanarkshire - Programme of Work for 2022/23
The results highlights both the successes experienced across North Lanarkshire as well as challenges faced:
Successes:
• Prior to the pandemic, one of the strongest and fastest growing economies in Scotland, with significant
growth over the last 10 years.
• Prior to the pandemic, strong business growth with an increase in the number of businesses per head
of population and jobs safeguarded through support to businesses.
• Population growth estimates are the most favourable for 10 years. 
• Attainment rates have steadily improved over the last eight years. 
Challenges:
• Significantly higher levels of child poverty, with one in four children currently living in poverty.
• A higher than average number of the working age population with no qualifications, restricting their
ability to access developing employment opportunities. 
• Large gaps in education outcomes for looked after children compared with all children, 
• A decrease in the number of young people achieving a positive post school destination after leaving
school. 
• Lower than average gross weekly pay levels.
Performance Overview
The Accounts Commission defines requirements for reporting performance information under the Local
Government Act 1992 in terms of improving local services and local outcomes and demonstrating Best Value.
Developed by the Improvement Service at the request of the Society of Local Authority Chief Executives and
Senior Managers (SOLACE), the Local Government Benchmarking Framework (LGBF) provides a suite of high-
level performance indicators, comparable across other councils, that are designed to help inform improvements
in services and outcomes. In this respect the latest results for the Council were presented to the Audit and
Scrutiny Panel in September 2021 and March 2022 through a series of information updates, which were aligned
to the priorities in The Plan for North Lanarkshire, to allow for scrutiny of data on costs, outputs, and outcomes
within the local context.
The 2021/22 performance information will not be available publicly until later in the year, however past
performance reports can be accessed via the Local Government Benchmarking Framework website and the
online data tool (https://scotland.mylocalcouncil.info/ ) for individual local authorities, or comparisons of Family
Group Local Authorities based on a geographical basis - city, urban, semi-urban and rural, or Scottish Index of
Multiple Deprivation (SIMD) characteristics.
During 2021/22 the Council has undertaken a structured programme of self-evaluation to underpin the duty to
secure continuous improvement.  This includes assessments on the Council’s compliance with the CIPFA
Financial Management (FM) Code.  The assessment reviewed the adequacy and effectiveness of the revised
Corporate Management Team arrangements and how well it operates as a vehicle for monitoring and
scrutinising;
• progress in implementing The Plan for North Lanarkshire and individual Programme of Work items
• the risk governance arrangements in respect of, for example, DigitalNL and whether the
arrangements for the Data Governance Board (DGB) adequately contribute to the achievement of the
Council’s vision as detailed in the Roadmap
• the effectiveness of current arrangements for the North Lanarkshire health and social care IJB, and
how well the Board meets its intended outcomes.
Climate Change
The council declared a Climate Emergency in June 2019 recognising as a public body it not only had a duty to
contribute to tackling climate change, but it must accelerate its own climate action (and encourage others to do
so too) in order to be part of the response to prevent further global temperature increases. A challenging target
of net zero emissions by 2030 was set for the area of North Lanarkshire. With the council’s Carbon Management
Plan due to expire during 2022, and in response to the council’s ambition to achieve net zero earlier than the
national target of 2045, a climate plan was developed North Lanarkshire Climate Plan The achievement of the
current targets contained within the Plan will see successive annual emission reductions from 2022 onwards,
enabling the council to reduce its footprint by 52.2% from its 2015/16 baseline i.e. a reduction of 61,141 carbon
Page 90 of 209

Page 91

Annual Accounts 2021/22
Management Commentary 
- 9 -
tonnes equivalent (tCO2e) by 2025/26. It is hoped that through the development of the route map, action plan
and in setting policy the council will achieve net-zero emissions by 2030. 
COVID-19 Recovery 
During 2021/22 the Council continued with its recovery from the pandemic and continued to provide advice and
support to the most vulnerable in our communities.  This included: 
• continuation of the Council’s Community Assistance Helpline for inbound and outbound calls. 
• facilitating a range of financial supports to individuals including crisis grants through the Scottish Welfare
Fund.
• putting in place processes to assess and award non-domestic rates relief to thousands of businesses across
North Lanarkshire.
In addition, the Council administered a range of grants totalling a further £17.186 million on behalf of the Scottish
Government (£68.433m in 2020/21) to support both businesses and individuals throughout the pandemic. These
have been assessed as agency payments and are not recognised as part of the Council’s financial position for
the year.  A net debtor of £0.222m is shown on the Council’s balance sheet in relation to reimbursement
outstanding as at 31st March 2022 (£15.262m in 2020/21). 
Financial Planning 
In line with the Strategic Policy Framework the Council has an overarching Financial Strategy, which clearly sets
out the framework for future decision making on the allocation of all available resources to ensure it is fully
integrated with the Plan for North Lanarkshire objectives and programme actions. The Council remains
committed to long-term financial planning and approved an update to the Medium Term Financial Plan on 30
September 2021 covering financial years 2022/23 to 2026/27.  Given the level of uncertainty surrounding funding
and difficulty forecasting too far into the future a 5 year plan is considered most meaningful. The plan recognises
the challenges facing the Council and makes assumptions about these, presenting a range of scenarios which
may ultimately be faced by the Council.  It includes assumptions about the likely levels of resources, which are
subject to ongoing review with updates presented following the Scottish Budget announcement and confirmation
of the Local Government Finance Settlement.   
The Council also has an approved Reserves Policy which aims to ensure available balances are managed and
utilised in accordance with effective governance principles, and continues to ensure financial plans are
affordable and sustainable.  A contingency reserve is held for unforeseen future events as well as to ensure
stability of cash flow management.  The level of contingency remains at £8m as approved as part of the 2021/22
budget setting and this level continues to be considered appropriate.  
Due to Local Government Financial Settlements and increased cost pressures the Council has made significant
budget savings, over a number of years, to ensure it complies with the statutory requirement to set a balanced
budget, whilst meeting the needs of local residents.  The following chart illustrates the significant value of savings
achieved over the past 5 years.  For 2021/22, Services achieved total savings of £14.228m against the approved
target of £20.050m (71%) with the shortfall of £5.822m also achieved through alternative savings and
management action. 
Page 91 of 209

Page 92

Annual Accounts 2021/22
Management Commentary 
- 10 - 
As a result of the highly challenging financial environment facing Local Authorities arising from reducing funding
for core services and increasing cost pressures, the Council has been required to reduce spending and generate
additional income over a number of years. This has been achieved through various means, including revising
service delivery models, implementing efficiency measures, reducing levels of service provision in some areas
and introducing or increasing fees and charges for others.  
To facilitate a more strategic approach to establishing budgets and associated savings options, a Revenue
Resources Budget Strategy was approved by the Policy and Strategy Committee in June 2019.  An annual
update details the continuing progress and highlights further considerations for moving forward with future
financial plans.  Notable progress and achievements are:
• The Council continues to see real benefits from having well developed medium term financial planning
arrangements, producing a rolling five year Medium Term Financial Plan which informs the three year rolling
budget setting process.  Despite facing a significant budget gap of £14m, the Council set a balanced budget
for 2021/22, which also allowed for a prudent level of investment.  This was possible largely due to
previously approved savings for financial years 2021/22 and 2022/23, which were agreed in February 2020,
thus putting the Council in a strong position to address the budget gap in 2021/22. However, it was
acknowledged that additional challenges and unprecedented uncertainties arising from COVID-19 has
restricted the Council’s ability to consider further actions to manage the forecast future budget gaps
including 2023/24. 
• Ongoing service redesign and savings proposals were considered by various Committees throughout
2020/21 in accordance with one of the key principles of the strategy.  This ensures delivery models are
prudent, affordable and sustainable, and drives out efficiency savings to support the management of future
forecast budget gaps. For 2021/22 this included re-profiling loan debt repayments, re-designing fleet
maintenance services and a review of management structures.
• The Council continues to give consideration to planned, sustainable use of available balances, in line with
the Council’s approved Reserves Policy and a key principle of the Revenue Resources Budget Strategy. 
This includes further development of forecast Change Management Fund reserve requirements.  A four
year forecast position was reported as part of the 2021/22 budget setting report, indicating that forecast
one-off costs of implementing the savings and transformation agenda, can be managed within existing
forecast reserves balances. This further demonstrates the sustainability of approved plans and associated
one-off costs. 
Council Tax 
Council Tax is the system of local taxation used to part fund services provided by local authorities.  Introduced
in 1993, the rate of tax payable is based on the value of residential property.  
In setting the 2021/22 budget, the Council decided that Council Tax would be frozen at 2020/21 rates,
maintaining a Band D charge of £1,221.25. By freezing the rates, the Scottish Government provided £4.640m –
approximately equivalent to a 3% increase. The Council Tax Income Statement for the year is provided on page
77 and provides the details of the calculation of the Council’s Council Tax base and the charge per dwelling for
each Council Tax Band.      
0
20,000
40,000
60,000
80,000
100,000
120,000
140,000
£000s £000s £000s £000s £000s
2017/18 2018/19 2019/20 2020/21 2021/22
Savings Achieved £000's
In Year Savings £000s Cumulative Savings £000s
Page 92 of 209

Page 93

Annual Accounts 2021/22
Management Commentary 
- 11 -
Treasury Management 
The Council’s Treasury Management team is responsible for ensuring the Council’s Capital Investment plans,
not resourced by capital grants and other contributions, is fully funded, whilst also managing the refinancing of
historic debt reaching maturity.  During the year, a suite of techniques and tools are adopted, sourcing treasury
management data, forecasts and market statistics to assist with decision making and developing a borrowing
strategy to achieve interest cost efficiencies.  The techniques include for example: cash flow management and
forecasting; balance sheet analysis; weekly PWLB loan rate trend analysis; debt maturity profiling; and debt
rescheduling.  These techniques combined with projections have enabled the Council to time its borrowing in
order to take advantage of opportunities that may arise to achieve beneficial borrowing rates, minimising interest
rate risk.  In recent years the strategy adopted has primarily been to use internal cash balances whilst
undertaking short-term borrowing where available at attractive rates. 
Adopting flexibilities within the Local Authority (Capital Finance and Accounting) (Scotland) Regulations 2016
(the 2016 Regulations) which came into force on 1 April 2016 allows a local authority to subsequently vary either
the period or the amount of the repayment (or both) if it considers it prudent to do so.  A review of the Council’s
loans fund was undertaken in 2020/21 and a revised Loans Fund Advance Repayments Policy approved by
Finance and Resources Committee on 26 November 2020 and incorporated within the Treasury Management
Strategy. The revised policy includes the application of a fixed average life to all loans fund advances, and
changes to the annuity rate adopted to calculate loans fund advance repayments, including the retrospective
adjustment to the period over which historic loans fund advance repayments were made and applying this
approach to future loans fund advances. This resulted in revised loans fund advance repayment profiles with
the Council applying a prudent approach specific to the Council’s financial position including an assessment of
the whole life impact both in nominal and NPV terms of options considered. The Council continued to see some
further one-off financial benefit from this review during 2021/22 financial year.
Capital Strategy 
Following the publication of the revised Prudential Code for Capital Finance in Local Authorities 2017, there is
a requirement for Councils to produce a Capital Strategy, to ensure the Council takes capital expenditure and
investment decisions in line with the Council’s priorities, service objectives and properly takes account of
stewardship, value for money, prudence, sustainability and affordability.  
The Capital Strategy forms part of the Council’s integrated approach to corporate resource planning which is
included in the Council’s overarching Financial Strategy, aligning with other Corporate Policies and Plans
informing the capital investment process.  It is a means of developing capital investment proposals based on
available resources aligned to The Plan for North Lanarkshire, Best Value and Efficiency, the Financial
Regulations, the Corporate Asset Management Plan, and the Medium Term Financial Plan.
The Capital Strategy to 2022/23 represents a refresh of the Capital Investment Strategy further developing the
previous approach, in light of the Prudential Code requirements.  The strategy is subject to ongoing review and
the main principles outlined and adopted remain unchanged.   A full review is due to be undertaken and
presented to Committee in cycle one of 2023.  
The Prudential Code for Capital Finance and Treasury Management Code of Practice were both revised in
December 2021, which included updated guidance on prudent borrowing requirements.  The revised code
specifies that an authority must not borrow to invest primarily for financial return, and that there would be
implications on an authority’s ability to source borrowing from the PWLB if the Code is breached. The updated
Codes also has new and updated prudential indicators for capital and treasury management monitoring that
require to reported to members on a quarterly basis.  These will be fully incorporated into future reports. 
Following a review of the Council’s capital programme and alignment with the Plan for North Lanarkshire, the
Council’s Strategic Capital Delivery Group developed a Strategic Capital Investment Plan for 2021/22 to
2025/26, which was approved at Policy and Strategy Committee in March 2021. This plan will deliver record
General Fund investment of £521.724m over the 5-year period including the first phase of funding in support of
the Council’s ambitions for Town and Community Hubs, Town Centres and Parks Masterplan. The capital
programme was reviewed and an updated Strategic Capital Investment Plan for 2022/23 to 202/26 was
approved at Policy and Strategy Committee in March 2022.  This updated plan will deliver General Fund
investment of £479.016m over this four-year period, with General Fund investment of £81.114m incurred in
2021/22 with total investment projected of £560.130m. 
Page 93 of 209

Page 94

Annual Accounts 2021/22
Management Commentary 
- 12 -
Revenue Expenditure and Income 
Revenue Expenditure is the day to day expenditure incurred by the Council in providing services to the public
including employee costs, property repairs and maintenance, office expenses, payments to other agencies, and
the cost of financing capital expenditure.  This expenditure is funded by the Scottish Government Grant which
is broken down into three parts namely General Revenue Grant, Non Domestic Rates Pool Income and Specific
Grants. Local Government is informed of its annual funding through the Local Government Finance Settlement.
In 2021/22, the Council was allocated general funding as follows:
• General Revenue Grant Funding (£621.480m): Government grant, allocated based on Grant Aided
Expenditure (GAE) calculations, using a suite of indicators such as population to base it on relative need;
• Non-Domestic Rates Pool Income (NDR) (£84.429m): Collected locally but pooled centrally, the Council’s
share is determined by a distribution from the National Pool.
The Council also received additional grants through the Local Government Finance Settlement for specific
purposes including: Early Years Expansion (£36.507m); Pupil Equity Fund (£10.926m); and Offenders/ Criminal
Justice Social Work (£6.544m).  In addition, the Council receives grants out-with the settlement and these are
disclosed within the accounts (Note 11, page 39).  In addition to these sources of income, the Council is able to
generate income through direct charges for certain services such as Council House rents.   
Budget Setting and Monitoring 
Councils are required, under Section 93 of the Local Government Finance Act 1992, to set a balanced budget
each year.  The starting point for determining the revenue budget is the base budget from the previous year,
updated to take account of the financial planning implications identified through the medium term financial plan,
including assumptions in relation to: Employee and Other Cost Pressures; Strategic Priorities; and Directed
Expenditure.  Available resources are estimated based on the Local Government Finance Settlement, Council
Tax base and use of reserve balances.  When combined, the need for additional savings to balance the budget
may be required. 
The Council approved the proposed General Fund Revenue Budget of £849.369m (inc. specific grants of
£51.025m), net of savings of £20.050m, on 2 March 2021.  However, the COVID-19 pandemic created significant
financial management and financial planning challenges for the Council. These challenges centred around the
difficulties in predicting costs associated with the response to and recovery from COVID-19 and the constantly
evolving funding position for both the Scottish Government and, by extension, local government. Given these
uncertainties, it was deemed prudent to set the Council’s core budget for 2021/22, with COVID-19 funding and
costs considered later in the year, when there was greater clarity over cost profiles and funding settlements. 
Therefore, the approved budget was further updated throughout 2021/22 to take account the approved COVID
Budget reported to Finance & Resources Committee on 23 September 2021, and Scottish Government
redeterminations/ additional funding made available to assist with managing the additional cost pressures mainly
due to COVID, resulting in a final budget of £874.726m. 
The 2021/22 budget has been closely monitored through the management and budgetary processes which are
embedded within the Council’s existing financial reporting arrangements. The Provisional Outturn position
reported to Corporate Management Team anticipated a combined surplus of £27.628m on the General Fund
and HRA, against the amended budget.  The movement to final outturn position reported per the Movement in
Reserves Statement is illustrated in the table overleaf; 
Page 94 of 209

Page 95

Annual Accounts 2021/22
Management Commentary 
- 13 - 
Budget
2021/22
Provisional
Outturn
2021/22
(Under)/
Overspend 
£m £m £m
Education and Families 432.778 429.153 (3.625)
Enterprise & Communities 195.021 190.948 (4.073)
Chief Executives & Other Corporate Services 87.676 86.642 (1.034)
Social Work (non Integrated) 167.328 167.328 0.000
Social Work (Integrated) 0.000 0.000 0.000
HRA 0.000 (2.262) (2.262)
Financing Costs & Other Budgetary Issues (8.077) (25.154) (17.077)
Total Expenditure (Provisional Outturn) 874.726 846.655 (28.071)
Sources of Funding 874.726 874.283 0.443
(Surplus)/Deficit (Provisional Outturn)   (27.628)
Use of Earmarked Reserves   36.505
Additional & Previously Approved Earmarked
Reserves   (34.544)
New Service Requests   (29.072)
GF/HRA Movements & Use of Reserves   (0.646)
Movement on General Fund and HRA Services   (55.385) 
Risk Management 
Risk management forms an important element of the Council’s corporate governance arrangements. 
The Corporate Management Team receive regular reports on the Corporate Risk Register as well as updates
on wider risk management arrangements.
The Corporate Risk Register contains:
• Risks with potential impacts which could significantly impair the organisation’s ability to achieve its corporate
priorities; 
• Those significant risks which are corporate in nature and which typically will require corporate leadership
and direction to control and/or manage; and
• Service level risks with potentially significant impacts which have been proposed for escalation to the
corporate risk register because they may be either cross-cutting, impacting several areas of the organisation
or, because of interdependencies, require more strategic leadership focus.
Within the Risk Register, there are six overarching primary risk categories: 
First Line 
Risk Management
in Services and
Divisions 
Second Line 
Risk Management
function 
Third Line 
Independent
assurance
Internal Audit 
Three Lines of Risk Management/Defence
Page 95 of 209

Page 96

Annual Accounts 2021/22
Management Commentary 
- 14 - 
Potential risks highlighted within the Corporate Risk Register currently include: 
• Information Security and Information Governance – mismanagement of information potentially leading to
breach, fines, legal action and/or adverse media coverage and reputational damage;
• Public Protection – Non-compliance with legal requirement to ensure adequate public protection, any
failures could result in death and serious physical or mental harm to children and adults; 
• Managing Strategic Change – The Council may be unable to effectively implement the pace and scale of
reform or change needed to enable it to deliver its corporate objectives, at a time of significant challenge,
long-term reductions in funding and an ageing and growing population;
• Health and Safety – Failure to comply with the Health and Safety at Work Act 1974 and associated legislation
protecting the health, safety and welfare of our employees, service users and anyone else who can be
affected by the Council’s activities;
• Engagement and Consultation with Communities– That the Council may fail to appropriately engage and
consult with communities, partners and stakeholders in the shaping and delivery of services. 
• Financial Sustainability – In the face of demographic and legislative change, and significant cost pressures
due to reductions in central government funding, the Council is unable to adequately fund and plan
resources to meet service delivery and deliver against its’ corporate ambitions.
Senior managers consider specific risks within the Corporate Risk Register in detail to assess the adequacy and
effectiveness of current controls and to ensure the Council has reduced and/or mitigated the risk to an
acceptable level.  Reports on the management of individual key corporate risks and on risk management
arrangements more generally across the organisation are also submitted regularly to elected members on the
Council’s Audit and Scrutiny Panel.
The corporate risk register is formally reviewed on an annual basis to ensure completeness and continuing
relevance and alignment to the Council’s strategic objectives.  The register is monitored throughout the year to
ensure it reflects any new or emerging risks.
2022/23 Budget 
The Council approved a composite General Fund Revenue budget of £887.270m for 2022/23 at a Council
meeting on the 17 February 2022, which is net of pre-approved savings of £16.484m (approved in February
2020).  However, as part of the Medium-Term Financial Plan update in September 2021 and in setting the
2022/23 budget in February 2022, the Council deemed it prudent to reverse £6.00m of 2022/23 savings, due to
the challenges facing Adult Social Care services and therefore the delivery of the 2022/23 DigitalNL Savings. 
This leaves £10.484m of savings to be delivered in 2022/23. 
The Council also approved new one-off investment of £13.000m to support COVID recovery and one-off
investment in local communities.  This is in addition to £9.423m (year 2) of budget approved for 2022/23, as part
of the COVID budget approved by Finance & Resources Committee in September 2021.  The Corporate
Management Team has also approved a further allocation of £4.407m for 2022/23 in relation to additional
funding requirements for Services linked to the anticipated legacy impacts of Covid,  which will be met from the
previously approved COVID contingency budget of £5.000m, for which there had been no requirement for. 
In setting the 2022/23 budget, the Council agreed a 3% rise Council Tax rates, raising a Band D to £1,257.89.    
Page 96 of 209

Page 97

Annual Accounts 2021/22
Management Commentary 
- 15 -
In addition, £8.000m continues to be provided as a contingency reserve, £30.551m of the General Fund balance
has been earmarked for COVID-19, £29.424m for Change Management and a further £138.536m earmarked to
fund specific future commitments, which leaves a general unallocated balance of £32.718m.  See details below:
2022/23 Earmarked Funds £m  £m
COVID-19 Directed Funding 6.896  
COVID-19 General Funding 20.655  
COVID-19 Recovery General Fund Contribution 3.000  30.551
Change Management Fund    29.424
Schools Future Contractual Obligations 54.175  
Early Years & Childcare Expansion 14.249  
Strategic Workforce Planning 13.000  
Temporary Accommodation 9.288  
Energy costs and Other Non Pay Inflation 7.220  
2022/23 Budget One-off Investment 6.000  
Pupil Equity Fund 5.122  
Balances held by Schools under Devolved School Management 3.652  
Digitisation 2.498  
Active & Creative Communities 2.000  
Enterprise Contract 1.687  
Schools ICT Orders/Refresh & FMS Project Development 1.680  
Business Gateway and Business Recovery 1.700  
Youth Guarantee Funding 2.367  
Winter Reserve 1.500  
E&C 21/22 One Off Investment 1.146  
Rapid Rehousing  1.159  
Other Earmarked Funds 10.093  138.536
Contingency Reserve   8.000
Unallocated Balance   29.754
General Fund Surplus as at 31 March 2022   236.264 
Financial Sustainability 
Taking a strategic and longer term approach to budget setting remains a sound financial management principle
and is essential to ensuring ongoing financial sustainability.  However, applying this principle is increasingly
challenging. Whilst the Scottish Government in their Resource Spending Review has indicated total funding for
Local Government between 2023/24 and 2026/27, there is no clarity of funding for individual Local Authorities,
making longer term planning extremely difficult.  It should also be recognised that the continued financial impact
of COVID-19 and huge uncertainty in respect of pay and non-pay inflation, present new and additional
challenges, which have the potential to significantly impact the Council’s finances over an extended planning
period.  The effect on service delivery and financial sustainability remains unclear and the Council continues to
work with COSLA to fight for a more sustainable funding package for Local Government. 
Revenue Resources Budget Strategy 
An update to the Revenue Resources Budget Strategy was taken to Policy and Strategy Committee in June
2021 and remains an integral part of the Council’s overarching Financial Strategy developed to ensure robust
governance in financial planning and to ensure the Council remains financially sustainable. The principles which
underpin the Strategy remain valid and will be further developed to ensure the continued relevance and
effectiveness of the Strategy in determining affordability in delivering the Plan for North Lanarkshire, the
Council’s recovery from COVID-19 and the continued challenging Local Government Financial settlements as
well as the significant increases in pay and non-pay inflation currently being experienced. 
Page 97 of 209

Page 98

Annual Accounts 2021/22
Management Commentary 
- 16 -
The changing picture for the economic outlook at both a UK and Scottish level will have implications for national
budgets with potential for reprioritisation of resources within both current and future spending plans. This means
that there is increased risk of an adverse impact on the Council’s Medium Term Financial Plan. 
The medium to longer term outlook for the economy and public finances in both the UK and Scotland is in a
period of huge instability that is unprecedented and will need to be closely monitored. This is likely to result in,
for example, continuing contraction of public sector expenditure, an increase in unemployment and the resulting
increased cost burden this will place on Local Authorities. An update of the Council’s Medium Term Financial
Plan will be reported to Committee in the autumn of 2022, which will outline the revised forecast budget gaps
based on a number of planning scenarios.  This will support members in determining any savings necessary to
ensure a balanced budget is set moving forward. 
Key Challenges and Pressures Facing Local Government 
It is important that the Council recognises the key challenges and pressures facing public services and
specifically Local Government. These challenges and pressures include:
• The ongoing financial impact of recovery from COVID-19 including; supporting the economic recovery
including supporting people, business and organisations 
• Continuing to provide priority services 
• Cost pressures arising from inflation, including pay awards, demographic changes and demand for services
• Continuing to ensure the Council develops the workforce for the future 
• Impact of Brexit
• Implementation of legislative and policy changes of both UK and Scottish Governments 
• Delivering transformation and digital services 
Financial Controls and Procedures 
Reference is made to the Council’s Section 95 Officer with regards responsibility for ensuring that proper controls
and procedures are in place to safeguard the Council’s assets. In this respect, the Section 95 Officer has
provided the Chief Executive with a statement of the effectiveness of internal financial controls within the
Authority. This assurance is contained within the Annual Governance Statement on pages 104 to 114. 
Acknowledgements 
Thank you to elected members of North Lanarkshire Council and colleagues across the Council, all of whose
efforts have contributed to the completion of these accounts. 
Elaine Kemp CPFA   Des Murray   Councillor James Logue
Head of Financial Solutions  Chief Executive  Council Leader
Page 98 of 209

Page 99

Annual Accounts 2021/22
Comprehensive Income and Expenditure Statement 
- 17 -
This statement shows the accounting cost in the year of providing services in accordance with generally accepted
accounting practices, rather than the amount to be funded from taxation. Local authorities raise taxation to cover
expenditure in accordance with regulations, and this is different from the accounting cost.  The taxation position is
shown in the Movement in Reserves Statement. 
Restated 
2020/21  2021/22
Gross
Expenditure
Gross
Income
Net
Expenditure 
Note Gross
Expenditure
Gross
Income
Net
Expenditure
£000 £000 £000   £000 £000 £000        
419,263 (75,095) 344,168 Education & Families  493,514 (75,706) 417,808
234,518 (30,468) 204,050 Enterprise & Communities  285,692 (64,589) 221,103
3,245 (3,245) - Trading Operations  2,614 (2,614) -
158,566 (96,225) 62,341 Chief Executives & Other Corporate
Services 
158,219 (92,224) 65,995
151,848 - 151,848 Adult Health & Social Care (Non-
Integrated) 
167,499 -       167,499
214,737 (206,716) 8,021 Adult Health & Social Care (Integrated)  227,804 (213,395) 14,409
115,075 (146,339) (31,264) Housing Revenue Account  120,588 (130,171) (9,583)
(3,120) (33) (3,153) Non Service-Specific Costs   (2,198) (11,938) (14,136)
1,294,132 (558,121) 736,011 Net Cost of Services  1,453,732 (590,637) 863,095        
- (1,375) (1,375) Other Operating Expenditure   8  (767) (767)
96,846 (46,476) 50,370 Financing and Investment Income and
Expenditure 
9 98,719 (51,145) 47,574
- (869,506) (869,506) Taxation and Non-specific Grant Income  10 - (891,091) (891,091)  
(84,500) (Surplus) or Deficit on the Provision of
Services   
18,811           
Items that will not be reclassified to the
(Surplus) or Deficit on the Provision of
Services      
(105,007) (Surplus) or deficit on the revaluation of 
non current assets
28   (232,365)  
52,108 Re-measurement of the net defined
Liability
26   (352,023)  
(52,899) Other Comprehensive Income and
Expenditure   
(584,388)          
(137,399) Total Comprehensive Income and
Expenditure   
(565,577)                
Page 99 of 209

Page 100

Annual Accounts 2021/22
Balance Sheet 
- 18 -
The Balance Sheet is a snapshot of the value at the reporting date of the assets and liabilities recognised by the
Council. The net assets of the Council (assets less liabilities) are matched by the reserves held by the Council.
Reserves are reported in two categories. The first category of reserves are usable reserves, i.e. those reserves that
the Council may use to provide services, subject to the need to maintain a prudent level of reserves and any
statutory limitations on their use (for example the Capital Reserve may only be used to fund capital expenditure or
repay loan charges). The second category of reserves are those that the Council is not able to use to provide
services. This category of reserve includes reserves that hold unrealised gains or losses (for example the
Revaluation Reserve), where amounts would only become available to provide services if the assets are sold; and
reserves that hold timing differences shown in the Movement in Reserves Statement line ‘Adjustments between
accounting basis and funding basis under regulations’.  
Restated
2020/21  2021/22 
£000  Note £000 £000 
Property, Plant and Equipment 13,14  
1,102,141  Council Dwellings  1,291,802 
1,504,711  Other Land and Buildings  1,568,839 
47,884  Vehicles, Plant and Equipment  46,688 
261,004  Infrastructure Assets  262,561 
12,360  Community Assets  15,854 
22,252  Surplus Assets  22,184 
46,668  Assets Under Construction  70,780 3,278,708 
Intangible Assets                                                       15  
123  Software Licences  99 
1,544  Software/Solution Development  2,981 
6,502  Intangibles Under Development  9,038 12,118
1,535
1,189
Long-Term Debtors
Long-Term Investments
16
17 
1,519
1,170
3,007,913 Long-Term Assets   3,293,515     
88 Short-Term Investments                                            17 89 
1,891 Inventories 18 2,529 
114,710 Short-Term Debtors (net of impairment) 19 86,465 
110,781 Cash and Cash Equivalents 20 114,256 
227,470 Current Assets   203,339     
(263,140) Short-Term Borrowing 17 (250,098) 
(156,836) Short-Term Creditors  21 (192,500) 
(13,372) Short-Term Provisions 22 (12,637) 
(7,258) Short-Term Finance Lease Liabilities 24,25 (7,013) 
(2,957) Revenue Grant Receipts in Advance  (1,403) 
(443,563) Current Liabilities   (463,651)     
(490,575) Long-Term Borrowing 17 (439,933) 
(151) Long-Term Provisions  22 (55) 
(173,905) Other Long-Term Liabilities (Finance Leases) 24,25 (166,945) 
(417,190) Other Long-Term Liabilities (Pensions) 26 (156,156) 
(1,081,821) Long-Term Liabilities   (763,089)     
1,709,999 Net Assets   2,270,114      
Usable Reserves   
162,181  General Fund Reserve  236,264 
27,453  Housing Revenue Account Balance  19,496 
4,470  Capital Fund  396 
11,651  Repairs and Renewals Fund  13,755 
13,000  Insurance Fund  13,000 
12,421  Capital Grants Unapplied Account  7,124 
231,176 Total Usable Reserves 27  290,035     
1,478,823 Unusable Reserves 28  1,980,079     
1,709,999 Total Reserves   2,270,114
The unaudited accounts were issued on 30 June 2022 and the audited accounts were authorised for issue on the
27 October 2022. 
Elaine Kemp, CPFA
Head of Financial Solutions Page 100 of 209

Page 101

Annual Accounts 2021/22
Movement in Reserves Statement 
- 19 - 
This statement shows the movement in the year on the different reserves held by the Council, analysed into Usable
Reserves (i.e. those that can be applied to fund expenditure or reduce local taxation) and other reserves. The
Surplus or (Deficit) on the Provision of Services line shows the true economic cost of providing the Council’s
services, more details of which are shown in the Comprehensive Income and Expenditure Statement. These are
different from the statutory amounts required to be charged to the General Fund Balance for Council Tax setting.
The Net Increase or Decrease before Transfers to Other Statutory Reserves shows the statutory General Fund
Balance and Housing Revenue Account before any discretionary transfers to and from the other statutory reserves
of the Council. 
Year Ended 31 March 2022 
Usable Reserves Unusable
Reserves
Total
Reserves  General
Fund
Housing
Revenue
Account
Capital
Fund
Repairs &
Renewals
Fund
Insurance
Fund
Capital
Receipts
Reserve
Capital Grants
Unapplied
Account 
£000 £000 £000 £000 £000 £000 £000 £000 £000
Restated         
Balance at 31 March 
2021
Transfer in of CLNL
balances 
162,181 
10,741 
27,453 
-
4,470 
-
11,651 
-
13,000 
-
-
-
12,421  1,478,823 
(14,752) 
1,709,999 
(4,011) 
Revised Restated
Balance as at 31 March
2021 
172,922  27,453  4,470  11,651  13,000  -   1,464,071  1,705,988
Movement in Reserves
during 2021/22         
Surplus / (Deficit) on
Provision of Services
(33,220) 14,409 - - - - - - (18,811)
Other Comprehensive
Income and Expenditure
- - - - - - -      584,388 584,388
Total  Comprehensive
Income and Expenditure
(33,220) 14,409 - - - - - 584,388 565,577 
Adjustment to useable
reserves permitted by
Accounting Standards 
(10,654)  (203)  -  -  -  -  -  10,857  - 
Adjustments between
Accounting Basis and
Funding Basis under
Regulations (Note 31) 
94,196  (22,366)  -  -  -  396  (5,297)  (68,380)  (1,451)
Depreciation/Amortisation/
Impairment 
10,654          203 - - - - - (10,857) 
Net  Increase /
(Decrease) before
Transfers to Other
Statutory Reserves
60,976 (7,957) - - - 396 (5,297) 516,008 564,127          
Transfers to and from
Other Statutory Reserves
(Note 32)
2,366 - (4,074) 2,104 - (396) - - -          
Increase / (Decrease) in
the Year   
63,342 (7,957) (4,074) 2,104 - - (5,297)      516,008 564,127          
Balance at 31 March 2022
Carried Forward
236,264 19,496 396 13,755 13,000 - 7,124 1,980,079 2,270,114          
Page 101 of 209

Page 102

Annual Accounts 2021/22
Movement in Reserves Statement 
- 20 - 
Restated Comparative Figures for Year ended 31 March 2021 
Usable Reserves Unusable
Reserves
Total
Reserves  General
Fund
Housing
Revenue
Account
Capital
Fund
Repairs &
Renewals
Fund
Insurance
Fund
Capital
Receipts
Reserve
Capital
Grants
Unapplied
Account 
£000 £000 £000 £000 £000 £000 £000 £000 £000          
Balance at 31 March
2020
48,401 14,146 1,154 672 13,000 - 17,724 1,477,503 1,572,600          
Movement in
Reserves during
2020/21         
Surplus / (Deficit) on
Provision of Services
57,976 26,524 - - - - - - 84,500
Other Comprehensive
Income and
Expenditure
- - - - - - - 52,899 52,899
Total  Comprehensive
Income and
Expenditure
57,976 26,524 - - - - - 52,899 137,399          
Adjustments between
Accounting Basis and
Funding Basis under
Regulations (Note 31)
65,629 (13,217) - - - 4,470 (5,303) (51,579) -          
Net  Increase /
(Decrease) before
Transfers to Other
Statutory Reserves
123,606 13,307 - - - 4,470 (5,303) 1,320 137,399          
Transfers to and from
Other Statutory
Reserves (Note 32)
(9,825) - 3,316 10,979 - (4,470) - - -          
Increase / (Decrease)
in the Year
113,780 13,307 3,316 10,979 - - (5,303) 1,320 137,399          
Balance at 31 March
2021 Carried Forward
162,181 27,453 4,470 11,651 13,000 - 12,421 1,478,823 1,709,999          
Page 102 of 209

Page 103

Annual Accounts 2021/22
Cash Flow Statement 
- 21 -
The Cash Flow Statement shows the changes in cash and cash equivalents of the Council during the reporting
period. The statement shows how the Council generates and uses cash and cash equivalents by classifying cash
flows as operating, investing and financing activities. The amount of net cash flows arising from operating activities
is a key indicator of the extent to which the operations of the Council are funded by way of taxation and grant
income or from the recipients of services provided by the Council. Investing activities represent the extent to which
cash outflows have been made for resources which are intended to contribute to the Council’s future service
delivery. Cash flows arising from financing activities are useful in predicting claims on future cash flows by providers
of capital (i.e. borrowing) to the Council.
2020/21   2021/22
£000  Note £000 £000 
OPERATING ACTIVITIES   
Cash Inflows:   
89,736 Rents (after rebates)  84,588 
121,769 Council Tax receipts  127,200 
628,153 Revenue Support Grant  621,928 
88,971    
71,438
DWP grants for Housing Benefits
Non Domestic Rates Receipts 
81,989
84,339 
83,639 Other government grants  96,522 
19,753 Cash received for goods and services  32,010 
80,188 Other operating cash receipts  84,620 
256 Interest received  203 
- Transfer from CLNL  10,741 
1,183,903    1,224,140      
Cash Outflows:   
(551,245) Cash paid to and on behalf of employees  (584,488) 
(372,654) Other operating cash payments  (380,608) 
(36,383) Housing Benefit paid out  (34,078) 
(13,305) Precepts paid  (14,887) 
(37,175) Interest Paid  (34,389) 
(1,010,762)    (1,048,450)     
173,141 Net Cash Inflow / (Outflow) from Operating Activities 33  175,690     
INVESTING ACTIVITIES   
Cash Inflows:   
3,340 Sale of non-current assets  1,410 
40,675 Capital grants received  50,385 
2,478 Other capital cash receipts  5,847 
465 Proceeds from Investments redeemed    17 
46,958    57,659      
Cash Outflows:   
(136,158) Purchase of non-current assets  (174,765) 
-  Long- term Investments  - 
- Investment in Subsidiary   - 
(136,158)    (174,765)
(89,200) Net Cash Inflow / (Outflow) from Investing Activities   (117,106)     
83,941 Net Cash Inflow / (Outflow) before Financing Activities 34  58,584     
FINANCING ACTIVITIES   
Cash Inflows:   
271,000 New Loans Raised  176,000 
Net Agency Grants  15,423 
271,000    191,423 
Cash Outflows:   
(283,676) Repayments of amounts borrowed  (239,287) 
(6,994) Capital payments of finance leases  (7,275) 
(15,423) Net Agency Grants    
(306,093)    (246,562)     
(35,093) Net Cash Inflow / (Outflow) from Financing Activities 34  (55,139)     
48,848 Net Increase / (Decrease) in cash and cash equivalents 34  3,445     
61,958 Cash and Cash Equivalents at the beginning of the year 34  110,781                 
(25) Increase / (Decrease) Non-cash in cash equivalents 34                     30
110,781 Cash and Cash Equivalents at the end of the year 34  114,256 
Page 103 of 209

Page 104

Annual Accounts 2021/22
Notes to the Accounts 
- 22 -
1. Accounting Policies
General Principles
The Statement of Accounts summarises the Council’s transactions for the 2021/22 financial year and its position at
the year-end of 31 March 2022. The Council is required to prepare an annual Statement of Accounts by the Local
Authority Accounts (Scotland) Regulations 2014; Section 12 of the Local Government in Scotland Act 2003 requires
these to be prepared in accordance with proper accounting practices. These practices comprise the Code of Practice
on Local Authority Accounting in the United Kingdom 2021/22, supported by International Financial Reporting
Standards (IFRS) and statutory guidance issued under section 12 of the 2003 Act. 
The accounting convention adopted in the Statement of Accounts is principally historical cost, modified by the
revaluation of certain categories of non-current assets and financial instruments.  The accounts have been prepared
on a going concern basis.   
Accruals of Income and Expenditure
Activity is accounted for in the year that it takes place, not simply when cash payments are made or received. In
particular: 
• Revenue from the sale of goods is recognised when the Council transfers the significant risks and rewards
of ownership to the purchaser and it is probable that economic benefits or service potential associated with
the transaction will flow to the Council; 
• Revenue from the provision of services is recognised when the Council can measure reliably the percentage
of completion of the transaction and it is probable that economic benefits or service potential associated
with the transaction will flow to the Council; 
• Supplies are recorded as expenditure when they are consumed – where there is a gap between the date
supplies are received and their consumption, they are carried as inventories on the Balance Sheet;
• Expenses in relation to services received (including services provided by employees) are recorded as
expenditure when the services are received rather than when payments are made;
• Interest receivable on investments and payable on borrowings is accounted for respectively as income and
expenditure on the basis of the effective interest rate for the relevant financial instrument rather than the
cash flows fixed or determined by the contract;
• Where revenue and expenditure have been recognised but cash has not been received or paid, a debtor or
creditor for the relevant amount is recorded in the Balance Sheet. Where debts may not be settled, the
balance of debtors is written down and a charge made to revenue for the income that might not be collected.
Prior Period Adjustments, Changes in Accounting Policies, Estimates and Errors
Prior period adjustments may arise as a result of a change in accounting policies or to correct a material error. 
Changes in accounting estimates are accounted for prospectively i.e. in the current and future years affected by the
change and do not give rise to a prior period adjustment.
Changes in accounting policies are only made when required by proper accounting practices or where the change
provides more reliable or relevant information about the effect of transactions, other events and conditions on the
Council’s financial position or financial performance.  
Where a change is made, it is applied retrospectively (unless stated otherwise) by adjusting opening balances and
comparative amounts for the prior period as if the new policy had always been applied.
Material errors discovered in the prior period figures are corrected retrospectively by amending opening balances
and comparative amounts for the prior period.  
Redemption of Debt
A Loans Fund has been established and all loans raised are paid into this Fund. Advances are made to Services to
finance capital expenditure and these are repaid by application of The Local Authority (Capital Finance and
Accounting) (Scotland) Regulations 2016.  
The schedule of Premiums and Discounts held at 31 March 2007 was transferred to the Financial Instruments
Adjustment Account on 1 April 2007 and have been designated as statutory premiums and discounts under statutory
guidance issued by the Scottish Government (Section 12 (2) b of the Local Government in Scotland Act 2003). This
schedule is used to determine the annual charge to the General Fund and reflects annual charging schedules held
at 31 March 2007. All charges are managed by movements to and from the Financial Instruments Adjustment
Account and the Movement in Reserves Statement (MiRS).
Page 104 of 209

Page 105

Annual Accounts 2021/22
Notes to the Accounts 
- 23 -
From 1 April 2007, costs associated with debt restructuring (Premiums and Discounts) are charged directly to the
Comprehensive Income and Expenditure Statement in the year of extinguishment in accordance with accounting
regulations. In line with the statutory guidance stated above, all premiums and discounts arising from an
extinguishment have been deferred and charged to the General Fund over a period greater than one year. Any
discount or premium incurred for restructuring exercises deemed a modification has been reflected in the carrying
amount of the loan.
External Interest Payable, Interest Receivable and Investment Income
External interest has been calculated and charged to the Comprehensive Income and Expenditure Statement on
an amortised cost basis over the life of the loan with the interest expense being recognised on a level yield / interest
rate basis. For the majority of loans, this represents the interest amount payable for the year per the loan agreement.
For those loans with a stepped interest rate feature, this results in a difference between the coupon rate and the
amount charged to the Comprehensive Income and Expenditure Statement. For interest payable on all loans held
at 31 March 2007, the net charge to the General Fund has been adjusted to reverse this differential. This is in line
with statutory guidance issued by the Scottish Government (Section 12 (2) b of the Local Government in Scotland
Act 2003). The Financial Instruments Adjustment Account (FIAA) has been credited / debited with the difference
between the actual amount due in the year and the effective interest rate over the life of the loan.
The Council manages its investments in accordance with the Local Government Investments (Scotland) Regulations
2010, including the preparation of an Annual Investment Strategy. The amount disclosed for interest receivable and
investment income is based on the amount receivable per the contractual terms of the financial assets. 
Capital Expenditure Charged to Revenue
Services, support services and trading accounts are debited with the following amounts to record the cost of holding
non-current assets during the year: 
• depreciation attributable to the assets used by the relevant service;
•  revaluation and impairment losses on assets used by the service where there are no accumulated gains in the
Revaluation Reserve against which the losses can be written off;
•  amortisation of intangible assets attributable to the service.
The Council is not required to raise Council Tax to fund depreciation, revaluation and impairment losses or
amortisation. However, it is required to make an annual contribution from revenue towards the reduction in its overall
borrowing requirement. Depreciation, revaluation and impairment losses and amortisation are therefore replaced
by the contribution in the General Fund Balance by way of an adjusting transaction with the Capital Adjustment
Account in the Movement in Reserves Statement for the difference between the two. 
Government Grants and Contributions
Whether paid on account, by instalments or in arrears, government grants and third party contributions and
donations are recognised as due to the Council when there is reasonable assurance that: 
• the Council will comply with the conditions attached to the payments, and 
• the grants or contributions will be received. 
Amounts recognised as due to the Council are not credited to the Comprehensive Income and Expenditure
Statement until conditions attached to the grant or contribution have been satisfied. Conditions are stipulations that
specify that the future economic benefits or service potential embodied in the asset in the form of the grant or
contribution are required to be consumed by the recipient as specified, or future economic benefits or service
potential must be returned to the transferor. 
Monies advanced as grants and contributions for which conditions have not been satisfied are carried in the Balance
Sheet as creditors. When conditions are satisfied, the grant or contribution is credited to the relevant service line
(attributable revenue grants and contributions) or Taxation and Non-specific Grant Income and Expenditure (non-
ringfenced revenue grants and all capital grants) in the Comprehensive Income and Expenditure Statement. 
Where capital grants are credited to the Comprehensive Income and Expenditure Statement, they are reversed out
of the General Fund Balance in the Movement in Reserves Statement (MiRS). Where the grant has yet to be used
to finance capital expenditure, it is posted to the Capital Grants Unapplied Reserve. Where it has been applied, it is
posted to the Capital Adjustment Account. Amounts in the Capital Grants Unapplied Reserve are transferred to the
Capital Adjustment Account once they have been applied to fund capital expenditure. 
Page 105 of 209

Page 106

Annual Accounts 2021/22
Notes to the Accounts 
- 24 -
Property, Plant and Equipment
Non-current assets that have physical substance and are held for use in the production or supply of goods or
services, for rental to others or for administrative purposes and that are expected to be used during more than one
financial year are classified as Property, Plant and Equipment.  
a) Recognition
Expenditure on the acquisition, creation or enhancement of property, plant and equipment is capitalised on an
accruals basis, provided that it is probable that the future economic benefits or service potential associated with
the item will flow to the Council and the cost of the item can be measured reliably. Expenditure that maintains
but does not add to an asset’s potential to deliver future economic benefits or service potential (i.e. repairs and
maintenance) is charged as an expense when it is incurred.
The Council operates a £10,000 de-minimis when recognising expenditure on property, plant and equipment.
b) Measurement
Non-current assets are initially measured at cost, comprising:
• the purchase price;
• any costs attributable to bringing the asset to the location and condition necessary for it to be capable
of operating in the manner intended by management 
The Council does not capitalise borrowing costs incurred whilst non-current assets are under construction. 
The cost of non-current assets acquired other than by purchase is deemed to be its fair value, unless the
acquisition does not have commercial substance (i.e. it will not lead to a variation in the cash flows of the
Council). In the latter case, where an asset is acquired via an exchange, the cost of the acquisition is the carrying
amount of the asset given up by the Council. 
Donated assets are measured initially at fair value. The difference between fair value and any consideration
paid is credited to the Taxation and Non-specific Grant Income and Expenditure line of the Comprehensive
Income and Expenditure Statement, unless the donation has been made conditionally. Until conditions are
satisfied, the gain is held in the Donated Assets Account. Where gains are credited to the Comprehensive
Income and Expenditure Statement, they are reversed out of the General Fund Balance to the Capital
Adjustment Account in the Movement in Reserves Statement.
Non-current assets are then carried in the Balance Sheet using the following measurement bases:
Property, Plant and Equipment: 
Council Dwellings In accordance with LASAAC guidance, fair value is adjusted to
reflect the ratio of local authority rents to private sector rents.
Other Land & Buildings Depreciated replacement cost/Existing Use Value
Vehicles, Plant & Equipment Open market value/Historical Cost 
Infrastructure Assets Historical cost
Community Assets Historical cost
Surplus Assets Fair Value (IFRS13)
Assets Under Construction Historical cost
Investment Properties Open market value
Heritage Assets Historic Cost/Insurance Value
Where there is no market-based evidence of current value because of the specialist nature of an asset,
depreciated replacement cost (DRC) is used as an estimate of current value. 
Where non-property assets have short useful lives or low values (or both), depreciated historical cost basis is
used as a proxy for current value. 
Non-current assets included in the Balance Sheet at current value are revalued sufficiently regularly to ensure
that their carrying amount is not materially different from their current value at the year-end, but as a minimum
every five years. Increases in valuations are matched by credits to the Revaluation Reserve to recognise
unrealised gains. Exceptionally, gains might be credited to the Surplus or Deficit on the Provision of Services
where they arise from the reversal of a loss previously charged to a service.
Where decreases in value are identified, they are accounted for as follows: 
• where there is a balance of revaluation gains for the asset in the Revaluation Reserve, the carrying
amount of the asset is written down against that balance (up to the amount of the accumulated
gains) 
Page 106 of 209

Page 107

Annual Accounts 2021/22
Notes to the Accounts 
- 25 -
• where there is no balance in the Revaluation Reserve or an insufficient balance, the carrying
amount of the asset is written down against the relevant service line(s) in the Comprehensive
Income and Expenditure Statement.
The Revaluation Reserve contains revaluation gains recognised since 1 April 2007 only, the date of its formal
implementation. Gains arising before that date have been consolidated into the Capital Adjustment Account.
It should be noted that only vehicles purchased by the Council are reported. Vehicles used by the Council
through Operational Leases are not included.  There were no material Heritage Assets held by the Council as
at 31 March 2022.  
When an item of Property, Plant and Equipment asset has major components whose cost is significant in relation
to the total cost of the item, the components are depreciated separately.
c) Depreciation
The Council employed the following depreciation policy for each class of non-current asset held during the year:
Property, Plant and Equipment: 
Council Dwellings Depreciated on a straight line basis up to 40 years
Other Land & Buildings No depreciation on land, buildings depreciated on a
straight line basis up to 60 years
Vehicles, Plant & Equipment Depreciated on a straight line basis up to 30 years
Infrastructure Assets Depreciated on a straight line basis up to 40 years
Community Assets No depreciation
Surplus Assets (Land) No depreciation
Surplus Assets (Other) Depreciated on a straight line basis up to 60 years
Assets Under Construction No depreciation
Investment Properties No depreciation
Heritage Assets No depreciation
The Council does not depreciate its non-current assets in the year of acquisition, charging a full year’s
depreciation on disposal.
The Council does not provide for depreciation on land or community assets with the exception of landfill sites,
which are depreciated over their useful life. 
d) Impairment
Assets are assessed at each year-end as to whether there is any indication that an asset may be impaired.
Where indications exist and any possible differences are estimated to be material, the recoverable amount of
the asset is estimated and, where this is less than the carrying amount of the asset, an impairment loss is
recognised for the shortfall. 
Where impairment losses are identified, they are accounted for as follows: 
• where there is a balance of revaluation gains for the asset in the Revaluation Reserve, the carrying
amount of the asset is written down against that balance (up to the amount of the accumulated gains) 
• where there is no balance in the Revaluation Reserve or an insufficient balance, the carrying amount
of the asset is written down against the relevant service line(s) in the Comprehensive Income and
Expenditure Statement. 
Where an impairment loss is reversed subsequently, the reversal is credited to the relevant service line(s) in the
Comprehensive Income and Expenditure Statement, up to the amount of the original loss, adjusted for
depreciation that would have been charged if the loss had not been recognised.
e) Disposal and Non-current Assets Held for Sale 
When it becomes probable that the carrying amount of an asset will be recovered principally through a sale
transaction rather than through its continuing use, it is reclassified as an asset held for sale. The asset is
revalued immediately before reclassification and then carried at the lower of this amount and fair value less
costs to sell. Where there is a subsequent decrease to fair value less costs to sell, the loss is posted to the
Other Operating Expenditure line in the Comprehensive Income and Expenditure Statement. Gains in fair value
are recognised only up to the amount of any losses previously recognised in the Surplus or Deficit on Provision
of Services. Depreciation is not charged on assets held for sale. 
If assets no longer meet the criteria to be classified as assets held for sale, they are reclassified back to non-
current assets and valued at th 
Page 107 of 209

Page 108

Annual Accounts 2021/22
Notes to the Accounts 
- 26 -
e lower of their carrying amount before they were classified as held for sale; adjusted for depreciation,
amortisation or revaluations that would have been recognised had they not been classified as held for sale, and
their recoverable amount at the date of the decision not to sell.
Assets that are to be abandoned or scrapped are not reclassified as assets held for sale. 
When an asset is disposed of or decommissioned, the carrying amount of the asset in the Balance Sheet
(whether property, plant and equipment or assets held for sale) is written off to the Other Operating Expenditure
line in the Comprehensive Income and Expenditure Statement as part of the gain or loss on disposal. Receipts
from disposals (if any) are credited to the same line in the Comprehensive Income and Expenditure Statement
also as part of the gain or loss on disposal (i.e. netted off against the carrying value of the asset at the time of
disposal). Any revaluation gains accumulated for the asset in the Revaluation Reserve are transferred to the
Capital Adjustment Account.
f) Charges Made to Revenue
A combination of depreciation and any relevant impairment is charged to Services for the use of assets based
upon their fair value rather than the financing costs of the level of debt outstanding on these assets, following
the CIPFA guidelines on Capital Accounting. The charge made to the Housing Revenue Account is an amount
equivalent to the statutory capital financing charges.
Investment Properties
Investment properties are those that are used solely to earn rentals and/or for capital appreciation. The definition is
not met if the property is used in any way to facilitate the delivery of services or production of goods or is held for
sale. 
Heritage Assets
The Council’s collections are held within the stores at Summerlee Museum of Scottish Industrial Life and North
Lanarkshire Heritage Centre.  The most significant of the collections are the Industrial and Social History items,
however the Museums Service also has a number of smaller collections including Archaeology, Numismatics,
Natural History, Ethnography and Art Collections.  
The Council’s policy for Heritage Assets follows the recognition and measurement treatment, including the treatment
of revaluation gains and losses, set out within the accounting policy for Property, Plant and Equipment. Heritage
Assets, where possible, should be measured at valuation.  However, in circumstances where this is not practicable
the asset will be measured at historical cost less any accumulated depreciation, amortisation and impairment. The
Council’s museum and gallery collections were managed by the Council subsidiary Culture and Leisure NL Ltd
(CLNL) on behalf of the Council prior to insourcing on 1 April 2021. CLNL had their own policy for the Acquisition
and Disposal of items to the Museum Service Inventory.  
For the current financial year on the grounds of materiality, it has not been considered appropriate to show Heritage
Assets separately on the face of the Council’s Balance Sheet but to continue to include these within Community
Assets under the Property, Plant and Equipment category.  Where valuation or cost information is not available and
Heritage Assets have not been recognised as a result, further information is provided in the notes to the accounts.
Intangible Assets
Expenditure on non-monetary assets that do not have physical substance but are controlled by the Council as a
result of past events (for example software development costs) is capitalised when it is expected that it will bring
benefits to the Council for more than 12 months.
Intangible assets are measured initially at cost. Such assets are not revalued as the fair value of the assets held
cannot be determined by reference to an active market.
The depreciable amount of an intangible asset is amortised on a straight line basis over its expected useful life and
charged to the relevant service line(s) in the Comprehensive Income and Expenditure Statement. The useful life of
these assets is deemed to be up to 15 years. In line with the Council’s accounting policy on Depreciation, no
amortisation is charged in the year of purchase with a full years charge in the year of disposal. 
Leases
IAS17 is the standard under which leases are recognised. Leases are classified as finance leases where the terms
of the lease transfer substantially all the risks and rewards incidental to ownership of the property, plant or equipment
from the lessor to the lessee. All other leases are classified as operating leases.
Finance Leases
The asset is accounted for on the Balance Sheet under Property, Plant and Equipment.  
Page 108 of 209

Page 109

Annual Accounts 2021/22
Notes to the Accounts 
- 27 -
a. a charge for the acquisition of the interest in the property, plant or equipment is applied to write down the lease
liability
b. a finance charge (debited to the Financing and Investment Income and Expenditure line in the Comprehensive
Income and Expenditure Statement) is applied
Finance leases are accounted for using the policies applied generally to non-current assets, subject to depreciation
being charged over the lease term if this is shorter than the asset’s estimated useful life.
Operating Leases 
Leases that do not meet the definition of finance leases are accounted for as operating leases. Rentals paid under
operating leases are charged to the appropriate Service account in the Comprehensive Income and Expenditure
Statement as an expense of the Services benefitting from use of the leased item over the lease term.
Impairment of Financial Assets
In determining the impairment of its financial assets measured at amortised cost and those measured at fair value
through other comprehensive income, the Council adopts the requirements of IFRS9 Financial Instruments in
assessing expected credit losses and accounting for impairment. One of the objectives of this standard is the
principle of applying impairment to financial assets which are part of a business model that includes contractual
cashflows. Impairment losses are calculated to reflect the expectation that the future cashflows might not take place
because the borrower could default on the obligations.
The level of credit risk is assessed to identify the credit losses particularly where risk has increased significantly
since initial recognition. Credit loss in relation to a financial instrument represents cash shortfalls measured by the
difference between the net present value of all contractual cashflows that are due to the Council in accordance with
the contract for the instrument and the net present value of all the cashflows the Council expects to receive
discounted at the original effective interest rate. Losses are measured in one of three ways: 
• Lifetime expected credit losses: the expected credit losses that result from all possible default events over the
expected life of a financial instrument;
• 12-month expected credit losses: the portion of lifetime expected credit losses that represent the losses that
result from default events that are possible within the next financial year;
• Cumulative changes in lifetime expected credit losses since initial recognition: the change in lifetime credit
losses (positive or negative) over those that were included in the estimated cashflows on initial recognition.   
The Council also consider impairment allowances for instruments which are not financial assets i.e. loan
commitments and financial guarantees.  
The Council has adopted the simplified approach for trade receivables and house rent receivables under which
impairment losses are automatically based on lifetime expected credit losses, removing the need to consider
changes in credit risk since initial recognition and the possibility that the appropriate measure should be 12-month
expected credit losses.  
The Council carries out an annual assessment of the impact of adopting the full accounting treatment for expected
credit losses, and on the grounds of materiality, generally does not recognise expected credit losses on financial
assets excluding trade receivables which were subject to a separate assessment in the Comprehensive Income
and Expenditure Account and accordingly has not adjusted the carrying amount per the Balance Sheet which
represents the gross amortised cost of the financial asset.  
For Trade Receivables the Council carries out an assessment of lifetime credit annually and has accounted for
impairment losses within the Comprehensive Income and Expenditure Account and accordingly has adjusted the
carrying amount for short-term debtors amount in the Balance Sheet.
Legal Charges Over Properties
As part of its service provision, the Council may decide to provide a rechargeable service to clients, with the recovery
of the costs incurred being deferred by virtue of placing a charging order on the recipient’s property. Due to the legal
nature of such arrangements and on the grounds of materiality, in the past the Council has not accounted for the
recovery of such sums due until they were realised, i.e. when the charging order was enforced.  
Where the Council considers these sums to be material the income has been accrued to the relevant Service and
recognised on the Balance Sheet as a Long-Term Debtor. 
Soft Loans
Long-Term Debtors include recorded amounts payable from service users receiving Social Care for which a charging
order has been placed on the recipient’s property as a method of recovering the debt. For the advances the Council
is charging interest at less than the market rate applicable for similar advances and as such these balances are
Page 109 of 209

Page 110

Annual Accounts 2021/22
Notes to the Accounts 
- 28 -
notionally recognised as soft loans. When soft loans are made, a loss is recorded in the Comprehensive Income
and Expenditure Statement (debited to the appropriate service) for the present value of the interest that will be
foregone over the life of the instrument, resulting in a lower amortised cost than the outstanding principal. Interest
is credited to the Financing and Investment Income and Expenditure line in the Comprehensive Income and
Expenditure Statement at a marginally higher effective rate of interest than the rate receivable from recipients, with
the difference serving to increase the amortised cost of the loan in the Balance Sheet. 
Subject to the exception below, the Council has assessed the impact of adopting the full accounting treatment for
soft loans held on this basis, and on the grounds of materiality, has decided not to recognise notional losses on soft
loans in the Comprehensive Income and Expenditure Account and accordingly to adjust the long-term debtor
balance stated within the Balance Sheet.  
Inventory
Inventory has been valued at the lower of cost and net realisable value, after making due allowance for obsolete
and slow moving items. Both average cost and individual cost bases are used for valuing stock at year end. 
Cash and Cash Equivalents
Cash is represented by cash in hand and deposits with financial institutions repayable without penalty on notice of
not more than 24 hours. Cash equivalents are highly liquid investments that mature in three months or less from the
date of acquisition and that are readily convertible to known amounts of cash with insignificant risk of change in
value.
In the Cash Flow Statement, cash and cash equivalents are shown net of bank overdrafts that are repayable on
demand and form an integral part of the Council’s cash management arrangements.
Provisions
Provisions are made where an event has taken place that gives the Council a legal or constructive obligation that
probably requires settlement by a transfer of economic benefits or service potential, and a reliable estimate can be
made of the amount of the obligation. For instance, the Council may be involved in a court case that could eventually
result in the making of a settlement or the payment of compensation. 
Provisions are generally charged as an expense to the appropriate service line in the Comprehensive Income and
Expenditure Statement when the Council has an obligation.  These are measured at the best estimate, as at the
balance sheet date, of the expenditure required to settle the obligation, taking into account relevant risks and
uncertainties. 
When payments are eventually made, they are charged to the provision carried in the Balance Sheet. Estimated
settlements are reviewed at the end of each financial year – where it becomes less than probable that a transfer of
economic benefits will now be required (or a lower settlement than anticipated is made), the provision is reversed
and credited back to the relevant service. 
Where some or all of the payment required to settle a provision is expected to be recovered from another party (e.g.
from an insurance claim), this is only recognised as income for the relevant service if it is virtually certain that
reimbursement will be received if the Council settles the obligation. 
Contingent Liabilities
A contingent liability arises where an event has taken place that gives the Council a possible obligation whose
existence will only be confirmed by the occurrence or otherwise of uncertain future events not wholly within the
control of the Council. Contingent liabilities also arise in circumstances where a provision would otherwise be made
but either it is not probable that an outflow of resources will be required or the amount of the obligation cannot be
measured reliably. 
Contingent liabilities are not recognised in the Balance Sheet but disclosed in a note to the accounts.
Contingent Asset
A contingent asset arises where an event has taken place that gives the Council a possible asset whose existence
will only be confirmed by the occurrence or otherwise of uncertain future events not wholly within the control of the
Council. 
Contingent assets are not recognised in the Balance Sheet but disclosed in a note to the accounts where it is
probable that there will be an inflow of economic benefits or service potential.  
Page 110 of 209

Page 111

Annual Accounts 2021/22
Notes to the Accounts 
- 29 -
Financial Instruments
Financial Liabilities and Financial Assets are carried at amortised cost in the Balance Sheet unless otherwise stated.
In the event the Financial Asset does not meet the criteria to be shown at amortised cost, it will be shown as fair
value through profit and loss or if a qualifying asset, as fair value through other comprehensive income. Fair Value
at amortised cost, ignoring impairment, represents the carrying amount on initial recognition plus the interest taken
to the Comprehensive Income and Expenditure Statement less the cash paid or received for both interest and
principal.
In accordance with IFRS9 Financial Instruments, in 2021/22, the Council adopted fair value at amortised cost where
cashflows were solely payments of principal and interest and the Council’s business model was to collect those
cashflows. 
For qualifying assets borrowing costs directly attributable to the acquisition, construction or production have been
capitalised and form part of the cost of the asset.  
The Council has accounting reserves to account for the restatement of financial instruments to an amortised cost
or fair value basis. The Financial Instruments Adjustment Account is a balancing account to allow for differences in
statutory requirements and proper accounting practice for financial liabilities and financial assets.  
Reserves
Reserves are split between Usable and Unusable Reserves in the Balance Sheet.  Usable Reserves include the
General Fund and Housing Revenue Account. Unusable Reserves are kept in order to manage accounting
processes for non-current assets, financial instruments and retirement benefits.        
Insurance Fund
The Council operates an Insurance Fund to make provision for outstanding claims and events.  Note 27 to the
Accounts provides further information on movements in the Insurance Fund.  
Repairs & Renewals Fund
The Council operates a Repairs & Renewals Fund which is earmarked for improvements to Council facilities. Note
27 to the Accounts provides further information on movements in the Repairs & Renewals Fund.
Capital Fund
The Council operates a Capital Fund where receipts from the sale of assets can be directed and utilised for financing
capital expenditure and loans fund repayments. 
Capital Receipts Reserve
The regulations covering capital receipts generated from the sale of assets allow the proceeds to be used to fund
capital expenditure and are available to support further capital investment.      
Capital Receipts in Advance Reserve
The Capital Receipts in Advance reserve is used to account for Grants received that have not yet met the conditions
set by the grant awarding body.  
Capital Grants Unapplied Account
Capital Grants Unapplied Account is used to hold grant received but not yet utilised.  This will be shown as part of
the Usable Reserves on the Balance Sheet.
Revaluation Reserve
The Revaluation Reserve records the accumulated gains on non-current assets held by the Council arising from
increases in value, as a result of inflation or other factors, since 1 April 2007. Whilst gains arising from revaluations
increase the net worth of the Council they would only result in an increase in spending power if the relevant asset
is sold and a capital receipt is generated. 
Capital Adjustment Account
The Capital Adjustment Account represents timing differences between the amount of the historical cost of non-
current assets that has been consumed and the amount that has been financed in accordance with statutory
requirements.
Pension Reserve
The Pension Reserve arises from the IAS19 Employee Benefits accounting disclosure requirements and represents
the difference between accounting for pensions and the funding of pension costs from taxation in line with the
Page 111 of 209

Page 112

Annual Accounts 2021/22
Notes to the Accounts 
- 30 -
statutory requirements. It is equal to the reported Pension Liability which recognises the Council's share of the net
funding position on the Strathclyde Pension Fund as projected at 31 March 2022.
The Council applies IAS19 and, as a result, quoted securities held as assets by the Strathclyde Pension Fund in
the defined benefit scheme are valued at bid price rather than mid-market value.
Employee Benefits
a) Benefits Payable During Employment
Short-term employee benefits are those due to be settled wholly within 12 months of the year-end. They include
such benefits as wages and salaries, paid annual leave and paid sick leave, bonuses and non-monetary benefits
(e.g. cars) for current employees and are recognised as an expense for services in the year in which employees
render service to the Council. 
An accrual is made for the cost of holiday entitlements (annual leave only) earned by employees but not taken
before the year-end which employees can carry forward into the next financial year. The accrual is made at the
wage and salary rates applicable in the current accounting year. 
The accrual is charged to Surplus or Deficit on the Provision of Services, but then reversed out through the
Movement in Reserves Statement to the Employee Statutory Adjustment Account so that holiday entitlements
are charged to revenue in the financial year in which the holiday absence occurs.
b) Termination Benefits
Termination benefits are amounts payable as a result of a decision by the Council to terminate an employee’s
employment before the normal retirement date or an employee’s decision to accept voluntary redundancy in
exchange for those benefits and are charged on an accruals basis to the appropriate service segment or, where
applicable, to a corporate service segment at the earlier of when the Council can no longer withdraw the offer
of those benefits or when the Council recognises costs for a restructuring. 
Where termination benefits involve the enhancement of pensions, statutory provisions require the General Fund
Balance to be charged with the amount payable by the Council to the pension fund or pensioner in the year, not
the amount calculated according to the relevant accounting standards. 
In the Movement in Reserves Statement, appropriations are required to and from the Pensions Reserve to
remove the notional debits and credits for pension enhancement termination benefits and replace them with
debits for the cash paid to the pension fund and pensioners and any such amounts payable but unpaid at the
year-end. 
c) Post Employment Benefits
As part of the terms and conditions of employment the Council offers retirement benefits to its employees. The
Council participates in two separate pension schemes, one exclusive to teachers and the other open to all other
employees.  
• The Scottish Teachers’ Superannuation Scheme, administered by the Scottish Public Pensions Agency
• The Local Government Pension Scheme, administered by Strathclyde Pension Fund 
Both of these schemes provide members with ‘defined benefits’ i.e. retirement lump sums and pensions earned
as employees work for the Council.  
However, the arrangements for the teachers’ scheme mean that liabilities for these benefits cannot ordinarily
be identified specifically to the Council. The scheme is therefore accounted for as if it were a defined contribution
scheme and no liability for future payments of benefits is recognised in the Balance Sheet. The Education and
Families expenditure line within the Comprehensive Income and Expenditure Statement is charged with the
employer’s contributions payable to teachers’ pensions in the year.
d) The Local Government Pension Scheme
The Local Government Pension Scheme (LGPS) is accounted for as a ‘defined benefits’ scheme:
• The liabilities of the Strathclyde Pension Fund attributable to the Council are included in the Balance
Sheet on an actuarial basis using the ‘projected credit unit method’ i.e. an assessment of the future
payments that will be made in relation to retirement benefits earned to date by employees, based on
assumptions about mortality rates, employee turnover rates, etc. and projections of future earnings for
current employees;
• Liabilities are discounted to their value at current prices using a discount rate of 2.7%.  The discount
rate used by the appointed actuaries to place a value on the liability is based on Corporate bond yields
Page 112 of 209

Page 113

Annual Accounts 2021/22
Notes to the Accounts 
- 31 -
on high quality bonds and recognises the weighted average duration of the benefit obligation for the
Council;
• The assets of the Strathclyde Pension Fund attributable to North Lanarkshire Council are included in
the Balance Sheet at their fair value at current bid prices for securities, estimated fair value for unquoted
securities and market price for property.
The change in the net pensions liability is analysed into the following cost components, comprising: 
• Current service cost – the increase in liabilities as a result of years of service earned this year – allocated
in the Comprehensive Income and Expenditure Statement to the services for which the employees
worked;
•  Past service cost – the increase in liabilities as a result of a scheme amendment or curtailment whose
effect relates to years of service earned in earlier years – debited to the Surplus or Deficit on the
Provision of Services in the Comprehensive Income and Expenditure Statement; 
•  Net interest on the net defined benefit liability (asset), i.e. net interest expense for the Council – the
change during the period in the net defined benefit liability (asset) that arises from the passage of time
charged to the Financing and Investment Income and Expenditure line of the Comprehensive Income
and Expenditure Statement – this is calculated by applying the discount rate used to measure the
defined benefit obligation at the beginning of the period to the net defined benefit liability (asset) at the
beginning of the period – taking into account any changes in the net defined benefit liability (asset)
during the period as a result of contribution and benefit payments; and
• Remeasurements, comprising the return on plan assets – excluding amounts included in net interest
on the net defined benefit liability (asset) – charged to the Pensions Reserve as Other Comprehensive
Income and Expenditure.
In relation to retirement benefits, Scottish Government regulations require the General Fund balance to be
charged with the amount payable by the Council to the pension fund or directly to pensioners in the year, not
the amount calculated according to the relevant accounting standards.  In the Movement in Reserves Statement
(MiRS) this means that there are appropriations to and from the Pensions Reserve to remove the notional
charges and credits for retirement benefits and replace them with charges for the cash paid to the pension fund
and pensioners and any such amounts payable but unpaid at the year end.  
Private Finance Initiatives (PFI) and Similar Contracts
PFI and similar contracts are agreements to receive services, where the responsibility for making available the
property, plant and equipment needed to provide the services passes to the PFI contractor. As the Council is deemed
to control the services that are provided under its PFI schemes, and as ownership of the property, plant and
equipment will pass to the Council at the end of the contracts for no additional charge, the Council carries the assets
used under the contracts on its Balance Sheet as part of property, plant and equipment. 
The original recognition of these assets at fair value (based on the cost to purchase the property, plant and
equipment) was balanced by the recognition of a liability for amounts due to the scheme operator to pay for the
capital investment. 
Non-current assets recognised on the Balance Sheet are revalued and depreciated in the same way as property,
plant and equipment owned by the Council. 
The amounts payable to the PFI operators each year are analysed into five elements: 
• Fair value of the services received during the year – debited to the relevant service in the
Comprehensive Income and Expenditure Statement;
• Finance cost – an interest charge on the outstanding Balance Sheet liability, debited to the Financing
and Investment Income and Expenditure line in the Comprehensive Income and Expenditure
Statement. The accounting treatment of the PFI for the provision of school buildings, maintenance and
other facilities is in accordance with recognised accounting standards including IAS17 Financial
Instruments: Recognition and Measurement and IFRIC 12 Service Concession Arrangements; 
• Contingent rent – increases in the amount to be paid for the property arising during the contract, debited
to the Financing and Investment Income and Expenditure line in the Comprehensive Income and
Expenditure Statement 
• Payment towards liability – applied to write down the Balance Sheet liability towards the PFI operator
(the profile of write-downs is calculated using the same principles as for a finance lease); 
Page 113 of 209

Page 114

Annual Accounts 2021/22
Notes to the Accounts 
- 32 -
• Lifecycle replacement costs – proportion of the amounts payable is posted to the Balance Sheet as a
prepayment and then recognised as additions to property, plant and equipment when the relevant works
are eventually carried out.
Revenue Expenditure Funded from Capital under Statute
Expenditure incurred during the year that may be capitalised under statutory provisions but that does not result in
the creation of a non-current asset has been charged as expenditure to the relevant service in the Comprehensive
Income and Expenditure Statement in the year. Where the Council has determined to meet the cost of this
expenditure from existing capital resources or by borrowing, a transfer in the Movement in Reserves Statement from
the General Fund Balance to the Capital Adjustment Account then reverses out the amounts charged so that there
is no impact on the level of Council Tax.
Value Added Tax
Generally, Value Added Tax is excluded from Income and Expenditure as all VAT collected is payable to HMRC
while the majority of VAT paid is recoverable from HMRC.  In the circumstance when the Council cannot fully recover
VAT paid, this is included within service expenditure to the extent that it is irrecoverable from HMRC.  
Re-measurement of the net defined benefit liability
Re-measurements or actuarial gains and losses arise through experience adjustments (the effects of differences
between the previous actuarial assumptions and what has actually occurred), and the effects of changes in actuarial
assumptions. All actuarial gains and losses have been recognised in Other Comprehensive Income and Expenditure
within the Comprehensive Income and Expenditure Statement.
Events after the Reporting Date
Events after the Balance Sheet date are those events, both favourable and unfavourable, that occur between the
end of the reporting period and the date when the Statement of Accounts is authorised for issue. Two types of
events can be identified: 
• those that provide evidence of conditions that existed at the end of the reporting period – the Statement
of Accounts is adjusted to reflect such events;
• those that are indicative of conditions that arose after the reporting period – the Statement of Accounts
is not adjusted to reflect such events, but where a category of events would have a material effect,
disclosure is made in the notes of the nature of the events and their estimated financial effect. 
Events taking place after the date of authorisation for issue are not reflected in the Statement of Accounts. 
Page 114 of 209

Page 115

Annual Accounts 2021/22
Notes to the Accounts 
- 33 -
2. Expenditure and Funding Analysis
2.1. The Expenditure and Funding Analysis shows how annual expenditure is used and funded from resources
(government grants, rents, Council Tax and non-domestic rates) by local authorities in comparison with those
resources consumed or earned by authorities in accordance with generally accepted accounting practices.
It also shows how this expenditure is allocated for decision making purposes between the Council’s services.
Income and expenditure accounted for under generally accepted accounting practices is presented more
fully in the Comprehensive Income and Expenditure Statement. 
*The split of this balance between General Fund and the HRA is shown within the Movement in Reserves Statement. 
2.2. Adjustments from General Fund to Comprehensive Income and Expenditure Statement 
Restated 2020/21  2021/22
Net
Expenditure
Chargeable to
the General
Fund and HRA
Balances
Adjustments
between the
Funding and
Accounting
Basis
(Note 2.2)
Net Expenditure
in the
Comprehensive
Income and
Expenditure
Statement 
Net
Expenditure
Chargeable to
the General
Fund and HRA
Balances
Adjustments
between the
Funding and
Accounting
Basis
(Note 2.2)
Net Expenditure
in the
Comprehensive
Income and
Expenditure
Statement
£000 £000 £000  £000 £000 £000       
306,607 37,561 344,169 Education & Families 374,296 43,512 417,808
156,568 47,482 204,050 Enterprise & Communities 153,240 67,863 221,103
(7) 7 - Trading Accounts 3 (3) -
57,248 5,093 62,341 Chief Executives & Other Corporate Services 56,798 9,197 65,995
148,434 3,414 151,848 Adult Health & Social Care (Non-Integrated) 164,788 2,712 167,499
(397) 8,418 8,021 Adult Health & Social Care (Integrated) (94) 14,504 14,409
(28,331) (2,933) (31,264) Housing Revenue Account (3,593) (5,991) (9,583)
1,582 (4,735) (3,153) Other Segments  (6,926) (7,120) (14,136)
641,703 94,307 736,011 Net Cost of Services 734,260 140,783 875,043       
(778,615) (41,895) (820,510) Other Income and Expenditure (791,534) (52,750) (844,284)
(136,912) 52,412 (84,499) (Surplus) or Deficit on the Provision of
Services
(53,023) 71,833 18,811       
(62,547)   Opening General Fund and HRA Balance
Transfer in Opening CLNL Balances 
(189,634)
(10,741)  
(136,913)   Less/Plus (Surplus) or Deficit on General Fund
and HRA Balance in Year
(53,023)  
9,825   Transfers to/(from) other statutory reserves (2,366)         
(189,634)   Closing General Fund and HRA Balance at
31 March*
(255,763)         
2021/22 Adjustments
for Capital
Purposes1
Net Change for
the Pensions
Adjustments2
Other
Differences3
Total
Adjustments
Education & Families 25,778 20,148 (2,414) 43,512
Enterprise & Communities 42,187 24,545 1,131 67,863
Trading Accounts (8) - 6 (3)
Chief Executives & Other Corporate Services 1,424 7,788 (14) 9,197
Adult Health & Social Care (Non-Integrated) 2,712 - - 2,712
Adult Health & Social Care (Integrated) (3) 14,550 (43) 14,504
Housing Revenue Account (11,327) 5,279 57 (5,991)
Other Segments  - 7,210 - 7,210
Net Cost of Services 60,762 65,099 (1,278) 124,583
Other Income and Expenditure (60,749) 9,690 (1,691) (52,750)
Surplus or Deficit 13 81,299 (2,969) 71,833
Page 115 of 209

Page 116

Annual Accounts 2021/22
Notes to the Accounts 
- 34 -
2020/21  Adjustments
for Capital
Purposes1
Net Change for
the Pensions
Adjustments2
Other
Differences3
Total
Adjustments
Education & Families 24,977 9,727 2,857 37,561
Enterprise & Communities 37,074 9,686 722 47,482
Trading Accounts (7) - 14 7
Chief Executives & Other Corporate Services 824 3,818 451 5,093
Adult Health & Social Care (Non-Integrated) 3,414 - - 3,414
Adult Health & Social Care (Integrated) - 7,411 1,007 8,418
Housing Revenue Account (6,148) 2,949 266 (2,933)
Other Segments  (3) (4,732) - (4,735)
Net Cost of Services 60,131 28,859 5,317 94,307
Other Income and Expenditure (48,675) 8,480 (1,700) (41,895)
Surplus or Deficit 11,456 37,339 3,617 52,412
1 Adjustments for capital purposes – this column adds in depreciation, amortisation and impairment and revaluation
gains and losses in the services line, and for:
• Other operating expenditure – adjusts for capital disposals with a transfer of income on disposal of assets
and the amounts written off for those assets.
• Financing and investment income and expenditure – the statutory charges for capital financing i.e.
Minimum Revenue Provision and other revenue contributions are deducted from other income and
expenditure as these are not chargeable under generally accepted accounting practices.
• Taxation and non-specific grant income and expenditure – capital grants are adjusted for income not
chargeable under generally accepted accounting practices. Revenue grants are adjusted from those
receivable in the year to those receivable without conditions or for which conditions were satisfied
throughout the year. The Taxation and Non Specific Grant Income and Expenditure line is credited with
capital grants receivable in the year without conditions or for which conditions were satisfied in the year.
2 Net change for the removal of pension contributions and the addition of IAS19 Employee Benefits pension related
expenditure and income:
• For services this represents the removal of the employer pension contributions made by the Council as
allowed by statute and the replacement with current service costs and past service costs.
• For Financing and investment income and expenditure the net interest on the defined benefit liability
is charged to the CIES.
3 Other differences between amounts debited/credited to the Comprehensive Income and Expenditure Statement
and amounts payable/receivable to be recognised under statute:
• For services this represents the accrual made for the cost of holiday/leave entitlements earned by
employees but not taken before the year-end which employees can carry forward into the next financial
year. These require to be included within the Net cost of Services under generally accepted accounting
practices, however are not chargeable to the General Fund.
• For Financing and investment income and expenditure the other differences column recognises
adjustments to the General Fund for the timing differences for premiums and discounts.
3. Accounting Standards that have been Issued but not yet Adopted
The Code requires the Council to disclose information about accounting changes that will be required by new
accounting standards in the 2022/23 Code due to be adopted in future years and the possible impact.  
CIPFA/LASAAC have formally agreed to defer the implementation of IFRS 16 Leases until 1 April 2024 however the
Code will allow for adoption from 1 April 2022 or 1 April 2023. The deferral is intended “…to reduce resource
pressures in the local audit framework while there are ongoing audit timeliness issues”.  The Council continues to
review its current lease portfolio including operating and finance leases in preparation for implementation of the new
accounting requirements.
If the standard had been adopted at 1 April 2022 this is estimated to have resulted in recognition of a right of use of
property assets and related liability of £2.855m, and a right of use vehicle, plant and equipment asset of £0.180m
and a reduced related liability of £0.126m (the difference of £0.054m is due to prepayments at 31 March 2022). 
Page 116 of 209

Page 117

Annual Accounts 2021/22
Notes to the Accounts 
- 35 -
In addition, the annual IFRS improvement programme notes four changed standards with an effective
implementation date of 1 April 2022:
• IFRS 1 (First-time adoption) – amendment relates to foreign operations of acquired subsidiaries transitioning
to IFRS 
• IAS 37 (Onerous contracts) – clarifies the intention of the standard
• IFRS 16 (Leases) – amendment removes a misleading example not referenced in the Code 
• IAS 41 (Agriculture) –expected to apply to local authorities in limited circumstances.
These are not anticipated to have a material impact on the Council. 
4. Critical Judgements in Applying Accounting Policies
In applying the accounting policies set out in Note 1, the Council has had to make certain judgements about complex
transactions or those involving uncertainty about future events. 
The critical judgements made in the Statement of Accounts are:
• The Council is deemed to control the services provided under the agreements for the provision of educational
establishments and for the Clyde Valley Waste Recycling Plant. The accounting policies for PPP schemes and
similar arrangements have been applied with the assets under the contracts included within Property, Plant
and Equipment on the Council's Balance Sheet. Further details are shown in a separate note to the accounts
for Public Private Partnerships and Similar Contracts. 
5. Assumptions Made About the Future and Other Major Sources of Estimation Uncertainty
The Statement of Accounts contains estimated figures that are based on assumptions made by the Council about
the future or that are otherwise uncertain. Estimates are made taking into account historical experience, current
trends and other relevant factors. However, because balances cannot be determined with certainty, actual results
could be materially different from the assumptions and estimates.
The items in the Council’s Balance Sheet at 31 March 2022 for which there is a significant risk of material adjustment
in the forthcoming financial year are as follows: 
Item Uncertainties Effect if Actual Results Differ from
Assumptions
Provisions The Council holds provisions of £12.693m
including £5.048m for the settlement of Equal Pay
claims and associated employer pension costs
and £7.493m for restoration of the Council’s
former landfill sites, based on an externally
sourced estimate of these costs.   
With regards the Provision made for Equal
Pay Claims a methodology was developed
which identified the number of claims and
the costs within an overall risk assessment
process. A change in the likely cost of
claims in respect of Pay Protection and Job
Evaluation categories would result in a
change in the Provision required of
£0.561m. 
A change in the likely future costs of landfill
restoration would result in a change in the
provision required. For instance, a 10%
increase in the restoration costs would
result in an increase in provision required of
£0.749m.
Page 117 of 209

Page 118

Annual Accounts 2021/22
Notes to the Accounts 
- 36 -
Item Uncertainties Effect if Actual Results Differ from
Assumptions
Property,
Plant and
Equipment
Assets are depreciated over useful lives that are
dependent on assumptions about the level of
repairs and maintenance that will be incurred in
relation to individual assets.  The current
economic climate makes it uncertain that the
Council will be able to sustain its current spending
on repairs and maintenance, bringing into doubt
the useful lives assigned to assets. 
Consideration has been given as to whether the
values of all non current assets, regardless of
whether or not they were subject to valuation
during the year, have materially changed, to
ensure that the balance sheet shows a fair
representation of the position as at 31 March
2022. Following a desktop exercise review of
assets, an adjustment has been made of
£289.949m to reflect estimated material
movements in current value since the last
valuations under depreciated replacement cost
for Education properties, Council Dwellings and
Leisure Properties & Open Spaces. 
If the useful life of assets is reduced,
depreciation increases and the carrying
amount of the assets falls.
It is estimated that the annual depreciation
charge for property, plant and equipment
would increase by £9.953m for every year
that useful lives had to be reduced. 
A 1% change in the value of the Council’s
Property, Plant and Equipment would result
in a movement on the Council’s balance
sheet of £32.787m. 
Fair Value
Measurement
When the fair values of financial assets and
financial liabilities cannot be measured based on
quoted prices in active markets (i.e. Level 1
inputs), their fair value is measured using
valuation techniques. Where possible, the inputs
to these valuation techniques are based on
observable data, but where this is not possible
judgement is required in establishing fair values.
These judgements typically include
considerations such as uncertainty and risk.
However, changes in the assumptions used could
affect the fair value of the Council’s assets and
liabilities. 
Where Level 1 inputs are not available, the
Council employs relevant experts to identify the
most appropriate valuation techniques to
determine fair value (for example for investment
properties, the Council’s chief valuation officer
and external valuer). 
Information about the valuation techniques and
inputs used in determining the fair value of the
Council’s assets and liabilities is disclosed in
Notes 17.3. 
Significant changes in any of the
unobservable inputs would result in a
significantly lower or higher fair value
measurement for the investment properties
and financial assets. For further information
refer to Note 17.2.
Net Pension
Liability
Estimation of the net liability to pay pensions
depends on a number of complex judgements
relating to the discount rate used, the rate at
which salaries are projected to increase, changes
in retirement ages, mortality rates and expected
returns on pension fund assets.  The Council is
engaged with Hymans Robertson via Strathclyde
Pension Fund to provide the Council with expert
advice about the assumptions to be applied.
The effects on the net pensions liability
can have a material effect on the Council’s
Net Worth. For instance, a 0.1% change in
the defined benefit obligation would result
in a change in the net pension liability of
£2.893m and a 0.1% change in the value
of the scheme assets would result in a
change in the net pension liability of
£2.737m. 
Page 118 of 209

Page 119

Annual Accounts 2021/22
Notes to the Accounts 
- 37 -
6. Events After the Balance Sheet Date
The Head of Financial Solutions issued the unaudited Statement of Accounts on 30 June 2022. 
There have been no material events since the date of the Balance Sheet which necessitate revision to the figures
in the financial statements.
7. Restatement
7.1. Single Entity Restatement
The figures for 2020/21 have been restated to reflect a number of adjustments to the notes to the accounts.  Further
details of these restatements are set out in the table below. 
7.2. Group Accounts Restatement
Following a review of the Group consolidation process a number of amendments were made to restate the 2020/21
Group Financial Statements.  The restatements reflect the final 2020/21 audited accounts of the Group Entities.
This has resulted in a net decrease (excluding Council restatements noted above in 7.1) to the Group Balance Sheet
of £1.158m, decreasing the uplift to the single entity position for 2020/21 to £133.324m; the Group Comprehensive
Income and Expenditure Statement remains unchanged; the Group Cash Flow Statement cash position remains
unchanged. The various adjustments have been reflected in the Group Movement in Reserves Statement and
associated notes to the Group Accounts. 
8. Other Operating Expenditure 
2020/21 2021/22 
£000 £000
(Gains) or losses on disposal of non-current assets (1,375) (767)   
Total (1,375) (767) 
Restatement Reason Amount
£000
Statements Affected
Reclassified/presentational change
for the PPP and DBFM Funding
Gap
Amendment to the
presentation of funding
set aside for future
Schools contracts
45,429 CIES 
Balance Sheet
MiRS
Note 2 Expenditure & Funding
Analysis
Note 21 Creditors
Note 27.1 General Fund
Group Accounts 
Restatement of 20/21 Housing
Rents Receivable
Incorrect 20/21 figure
disclosed in error.
3,652 Note 17.3 Credit Exposure to
Council’s Customers
Note 19 Short Term Debtors
Note 17.1 Types of Financial
Instruments
Note 17.2 Fair Value of Assets &
Liabilities Carried at Amortised
Cost
Restatement of Renumeration note
Pension Benefits of Senior
Councillors 2020/21
Movement in Senior
Councillor’s posts 
(2) Renumeration note 4a) Pension
Benefits of Seniors
Page 119 of 209

Page 120

Annual Accounts 2021/22
Notes to the Accounts 
- 38 -
9. Financing and Investment Income and Expenditure  
2020/21 2021/22  
Expenditure Income Expenditure Income  
£000 £000 £000 £000
Interest Payable and similar charges 37,352 - 34,087 -
Pensions interest income on plan assets - (45,307) - (50,814)
Pension interest cost on defined benefit
obligation
53,584 - 60,132 -
Interest receivable and similar income  (727)  (231)
Surpluses on Trading Undertaking not
included in Net Cost of Services 
216  (326) 376 1
Income from dissolution of group entities  - - - -
Financial Guarantee  - (106) - (101)
Gain on De-recognition of Financial Asset  - (10) - -
Impairment of Financial Assets  5,694 - 4,123 -      
Total 96,846 (46,476) 98,718 (51,145)
10. Taxation and Non-Specific Grant Income  
2020/21 2021/22  
£000 £000
Income from Council Tax (122,490) (125,200)
Distribution from Non-Domestic Rates pool (71,360) (84,429)
General Revenue Grant (628,356) (621,480)
Recognised capital grants and contributions (47,300) (58,530)    
Total (869,506) (889,639)
It should be noted that the General Revenue Grant recognised in the CIES has been adjusted from that shown in
Local Government Finance Circular 1/2022 to reflect proper accounting practice. In accordance with LASAAC
guidance, income included within the circular totalling £11.032m has been treated as relating to an agency
arrangement and therefore not reflected within the Council’s CIES. Income not included in the circular of £1.065m
has been accrued in relation to the final Discretionary Housing Payment claim. 
Page 120 of 209

Page 121

Annual Accounts 2021/22
Notes to the Accounts 
- 39 -
11. Grant Income
The Council credited the following grants and contributions to the Comprehensive Income and Expenditure
Statement 
2020/21 2021/22  
£000 £000
Credited to Comprehensive Income and Expenditure Statement   
General Revenue Grant 628,356 621,480
Distribution from Non-Domestic Rates pool 71,360 84,429
Capital - Scottish Government General Grant 22,704 21,908
Capital - Scottish Government Other Grants  23,318 34,223
Capital – Other Grants 1,173 1,470
Donated Assets 105 929
Total 747,016 764,448    
Credited to Services  
Housing Benefit 88,832 81,925
1140 Hours Early Years 32,581 36,507
Pupil Equity Fund 9,110 10,926
Scottish Attainment Challenge 8,199 7,799
Offenders / Criminal Justice Grant 6,589 6,544
Scotland’s Schools for the Future
COVID 19 - Additional Teachers and Support
4,761
3,772
4,772
-
European Grant Income 2,062 1,388
Regeneration Capital Grant Fund
COVID 19 - Discretionary Fund
1,735
1,710
-
-
Education Maintenance Allowance
COVID 19 - Vulnerable Children and Young People - Winter Protection
COVID 19 - Food Fund - Holidays
Vacant and Derelict Land Fund
Fleet
1,321
1,318
1,303
1,287
1,132
1,066
-
-
720
144
Home Energy Efficiency Programme
NSS Donated PPE
Physical Education, Physical Activity & Sport
Young Person’s Guarantee
City Deal
COVID 19 - Furlough Income
COVID 19 - Vaccination Centre
1,087
1,085
922
816
815
788
536
173
-
865
1,346
486
900
2,385 
Resettlement Programme 448 237
Directed Service Grants – COVID
SG Main Capital Grant - 3rd Party Write Off's
No One Left Behind
Test Centre Set Up
Children & Young People’s Mental Health
Other Miscellaneous Grants and Contributions
-
311
203
5
-
3,051
642
1,474
883
812
696
3,502
Total 175,779 166,192  
Page 121 of 209

Page 122

Annual Accounts 2021/22
Notes to the Accounts 
- 40 -
12. Agency Services
The Council bills and collects domestic water and sewerage charges on behalf of Scottish Water along with its own
Council Tax. During 2021/22 the Council collected and paid over £52.800m (2020/21 £51.248m) and received
£1.137m (2020/21 £1.137m) for providing this service.
In addition, throughout the course of the COVID-19 pandemic, the Council has been asked by Scottish Government
to administer a number of grant schemes on their behalf to a wide range of recipients; most notably targeted
business support funding such as the strategic framework, but also including grants to the newly self employed,
and low income families. The Council made payments of £17.186m (£68.433m in 2020/21), with a net debtor of
£0.222m shown on the Council’s balance sheet in relation to reimbursement outstanding as at 31st March 2022
(£15.262m in 2020/21). Further detail is shown in the table below. 
Net Debtor
at 
31 March 2020
Payments
Made in  
2020/21
Funding
Received
in 2020/21 
Net Debtor        
at 
31 March 2021
Payments
Made in
2021/22
Funding
Received in
2021/22
Net Debtor 
at 
31 March 2022              
£000         
£000
£000 £000 £000 £000 £000        
Business Grant Scheme  2,690 39,532 (42,187) 35 37 - 72
Strategic Framework  - 11,703 - 11,703 1,010 (12,713) -
Retail, Hospitality Top Up
Support   
- 9,184 (9,390) (206) 2,807 (3,729)  (1,128) 
Child Bridging Payment  -  -  -  -  4,821  (4,856)  (35) 
Taxi and Private Hire
Vehicle Driver Support 
- 2,313  -  2,313  3,715  (4,623)  1,405
£100 Hardship Payments      - 2,154 (2,243) (89) 1,134 (1,045) -
Self Isolation      -            310 - 310 2,170 (1,697) 783
Other  3,237 (2,041) 1,196 1,492 (3,563) (875)        
Total Provisions         2,690 68,433 (55,861) 15,262 17,186 (32,226) 222
Page 122 of 209

Page 123

Annual Accounts 2021/22
Notes to the Accounts 
- 41 -
13. Property, Plant and Equipment
13.1. Movement on Balances in 2021/22 
The Scottish Government has issued Finance Circular 9/2022 and the Council are invoking the statutory overrides
permitted by this guidance which removes gross book value and accumulated depreciation amounts for infrastructure
assets. The net book value of these assets as at 31 March 2022 is £262.561m (2020/21 £261.004m) and is part of the
property, plant and equipment figure in the balance sheet. 
HRA Dwelling Other Land
& Buildings
Vehicles,
Plant &
Equipment
Community
Assets
Surplus
Assets
Assets
Under
Construct’n
Total  
£000 £000 £000 £000 £000 £000 £000
Cost or Valuation
At 1 April 2021 1,179,654 1,683,365 89,959 12,360 22,391 46,669 3,034,398
Transfer in of CLNL
Balances - 4,146 2,622 - - - 6,768
Revised 1 April 2021 1,179,654 1,687,511 92,581 12,360 22,391 46,669 3,041,166
Additions in year 62,799 12,102 8,336 3,538 - 63,789 150,564
Donated assets - - 929 - - - 929
Disposals in year - - (2,606) - - - (2,606)
Revaluation and
impairment
adjustments to
revaluation reserve
23,575 (34,687) (1,464) - 33 - (12,543)
Revaluation and
impairments
adjustments to CIES
- (31,230) (381) (44) (85) (1,201) (32,941)
Transfer to/ (from)
AUC 28,194 8,783 227 - - (38,477) (1,273)
Transfer to assets held
for sale - - - - - - -
Other reclassifications - - - - - - -
At 31 March 2022 1,294,222 1,642,479 97,622 15,854 22,339 70,780 3,143,296
Depreciation       
At 1 April 2021 77,513 178,654 42,075 - 139 - 298,381
Transfer in of CLNL
Balances - 3,427 1,889 - - - 5,316
Revised 1 April 2021 77,513 182,081 43,694 - 139 - 303,697
Depreciation charge
for the year 29,336 47,085 11,226 - 16 - 87,663
Revaluation and
impairment
adjustments to
revaluation reserve 
(104,429) (144,218) (89) - - - (248,736)
Revaluation and
impairments
adjustments to CIES 
- (11,308) (1,561) - - - (12,869)
On disposals - - (2,606) - - - (2,606)
Other reclassifications - - - - - - -
At 31 March 2022 2,420 73,640 50,934 - 155 - 127,149         
Net Book Value       
At 31 March 2022 1,291,802 1,568,839 46,688 15,854 22,184 70,780 3,016,147
At 31 March 2021 1,102,141 1,504,711 47,884 12,360 22,252 46,668 2,736,016         
Nature of Asset
Holding at 31 March
2022       
Owned 1,291,802 1,274,086 46,652 15,854 22,184 70,780 2,721,358
Finance Lease - - 36 - - - 36
PPP - 294,753  - - - - 294,753
Page 123 of 209

Page 124

Annual Accounts 2021/22
Notes to the Accounts 
- 42 -
13.2. Movement on Balances in 2020/21   
HRA
Dwelling
Other
Land &
Buildings
Vehicles,
Plant &
Equipment
Community
Assets
Surplus
Assets
Assets
Under
Construct’n
Total  
£000 £000 £000 £000 £000 £000 £000
Cost or Valuation
At 1 April 2020 1,122,536 1,566,339 87,963 11,384 16,908 26,994 2,832,124
Additions in year  47,449 22,399 9,990 745 11 36,721 117,315
Donated assets - - 105 - - - 105
Disposals in year - (2,593) (8,743) - (245) - (11,581)
Revaluation and
impairment adjustments
to revaluation reserve
8,745 90,081 66 111 5,724 - 104,727
Revaluation and
impairments
adjustments to CIES
- (6,571) - (11) (7) (1,587) (8,176)
Transfer to/ from AUC 924 13,710 578 131 - (15,556) (213)
Transfer to assets held
for sale - - - - - -                   -
Other reclassifications - - - - - 96 96
At 31 March 2021 1,179,654 1,683,365 89,959 12,360 22,391 46,668 3,034,397
Depreciation
At 1 April 2020 49,349 133,003 40,439 - 124 - 222,915
Depreciation charge for
the year 28,164 46,127 10,377 - 15 - 84,683
Revaluation and
impairment adjustments
to revaluation reserve 
- - - - - - -
Revaluation and
impairments
adjustments to CIES 
- (476) - - - - (476)
On disposals - - (8,741) - - - (8,741)
Other reclassifications - - - - - - -
At 31 March 2021 77,513 178,654 42,075 - 139 - 298,381         
Net Book Value       
At 31 March 2021 1,102,141 1,504,711 47,884 12,360 22,252 46,668 2,736,016
At 31 March 2020 1,073,187 1,433,336 47,524 11,384 16,784 26,994 2,609,209                
Nature of Asset
Holding at 31 March
2021     
Owned 1,102,141 1,227,237 47,884 12,360 22,252 46,668 2,458,542
Finance Lease - - - - - - -
PPP - 277,474 - - - - 277,474
Page 124 of 209

Page 125

Annual Accounts 2021/22
Notes to the Accounts 
- 43 -
13.3. Valuation of Non-Current Assets
The following statement shows the progress of the Council’s five-year rolling programme for the revaluation of non-
current assets. The properties were valued by the Council’s registered valuers within external advisors BNP Paribas
in conjunction with the Council’s Asset and Procurement Solutions, in accordance with the Statement of Asset
Valuation Practice and Guidance Notes of the Royal Institute of Chartered Surveyors.  
Council
Dwellings
Other
Land &
Buildings
Vehicles,
Plant &
Equipment
Community
Assets
Surplus
Assets
Assets
Under
Total
Construction  
£000 £000 £000 £000 £000 £000 £000       
Value at historical
cost
- 127,892 45,240 13,479 1,587 70,780 258,978         
Valued at current
value plus additions
less depreciation as
at:       
31 March 2022 138,668 220,336 383 - 2,105 - 361,492
31 March 2021 - 186,549 1,002 112 11,912 - 199,575
31 March 2020 - 37,594 - - - - 37,594
31 March 2019 - 959,678 - - - - 959,678
31 March 2018 1,153,134 36,790 63 2,263 6,580 - 1,198,830         
Total Value as at 31
March 2022
1,291,802 1,568,839 46,688 15,854 22,184 70,780 3,026,147
The five-year rolling valuation programme, as determined by Asset and Procurement Solutions, is structured on
the following outline: 
Year 1 2018/19 Education Properties
Year 2 2019/20 Social Work, Office Buildings, Depots and Industrial Properties
Year 3 2020/21 Leisure Properties
Year 4 2021/22 Leisure Properties and Open Spaces
Year 5 2022/23 Council Dwellings, Planning and Development Properties, Car Parks and
Miscellaneous
2021/22 was the fourth year of the Council’s rolling five-year revaluation programme and will continue in 2022/23
with Council Dwellings, Planning and Development Properties, Car Parks and Miscellaneous, in line with the five year
valuation programme outlined above.
At 31 March 2022, a BCIS indexation adjustment was made of £141.643m (15.86%) for Education properties within
Other Land & Buildings, £141.807m (13.87%) for Council Dwellings, and Leisure Properties and Open Spaces
within Other Land & Buildings £6.387m and within Vehicle, Plant and Equipment £0.111m (11.1%) to reflect
estimated material movements in current value since the last valuation under the depreciated replacement cost,
which was undertaken in 2018/19 for primarily Education Properties, 2017/18 for Council Dwellings and 2021/22
for Leisure Properties and Open Spaces.  These adjustments are incorporated within the 31 March 2022 figures in
the table above.
14. Heritage Assets
The Council recognises that there are a number of assets that could be categorised as a Heritage Asset, however
due to materiality these have remained within the Community Assets and Infrastructure Assets classification within
Property, Plant and Equipment on the Balance Sheet.  A summary of the collections are shown in the table below:
Collection No. In
Collection
Value  
£000
Civic Regalia 1 296
Museum Exhibits 1 9
Paintings 12 109
Sculptures 1 39
Total  15 453
Page 125 of 209

Page 126

Annual Accounts 2021/22
Notes to the Accounts 
- 44 -
The Museum Exhibits, Paintings and Civic Regalia are included within Community Assets on the Balance Sheet,
whilst the sculpture is included within Infrastructure Assets.
As well as the recognised Heritage Assets, the Museum Service and Archive collections also hold items that are of
significant interest to the local area however are not significant in terms of value.  A summary of these items include: 
Industrial History Collection
Includes industrial objects ranging from large individual plant to small hand tools and ephemera with an emphasis
on local iron, steel, coal and engineering industries.  
Social History
Comprises of a comprehensive range of artefacts, textiles and ephemera which relate to the domestic, community,
personal and working lives of North Lanarkshire during the 19th and 20th centuries. 
North Lanarkshire Archive 
Documents the transformation of North Lanarkshire from an agriculture and manufacturing area to a heavy industry
area.  
Other Collections
Other smaller collections include:
Archaeology Focuses predominantly on local prehistoric, Roman and medieval finds, including
burial urns and pottery shards.
Natural History   Represented by a small number of rocks, fossils and local materials and specimens
Numismatics Comprises of a range of medals; Roman, medieval and contemporary coinage;
Scottish trade tokens and miners’ tallies.
Ethnographic Victorian artefacts from Africa, Polynesia and East Asia.
Art Ranges from portraits of civic dignitaries and local figures to landscapes, historical
views and works illustrating aspects of daily life.
15.  Intangible Assets
The Council accounts for software licences and software development costs as intangible assets. There are no
internally generated intangible assets.   
2020/21 2021/22 
Software
Licences
Software
Development
Costs
Intangibles
Under
Development
Total Software
Licences
Software
Development
Costs
Intangibles
Under
Development
Total  
£000 £000 £000 £000 £000 £000 £000 £000
Balance at 1st
April
- 169 2,629 2,798 123 1,544 6,502 8,169
Additions in
year
123 248 5,017 5,388 - 294 3,975 4,269
Transfers  - 1,144 (1,144) -  1,438 (1,438) -
Amortisation - (17) - (17) (25) (295) - (320)
Balance at
31st March
123 1,544 6,502 8,169 99 2,981 9,038 12,118         
Represented
by:        
Gross
Carrying
Amount
123 1,561 6,502 8,186 123 3,293 9,039 12,455
Accumulated
amortisation
- (17) - (17) (25) (312) - (337)
Balance at
31st March
123 1,544 6,502 8,169 99 2,981 9,039 12,118
At 31 March 2022, the Council had contractual capital commitments of £3.635m in respect of the acquisition of
intangible assets.  
Page 126 of 209

Page 127

Annual Accounts 2021/22
Notes to the Accounts 
- 45 -
16. Long-Term Debtors  
2020/21 2021/22  
£000 £000    
Balance at the start of the year 2,036 1,535
Recorded debt (259) (61)
Bad debt provision (242) 45
Balance at the end of the year 1,535 1,519
For further details refer to Soft Loans and Provisions: Financial Guarantee section within Note 17.
17. Financial Instruments
17.1. Types of Financial Instrument
The total investments, borrowing and long-term liabilities disclosed in the balance sheet are made up of the
following categories of financial instruments: 
Long-Term Current 
At 31 March
2021
At 31 March
2022
At 31 March
2021 
At 31 March
2022
Financial Liabilities £000 £000 £000 £000     
Borrowings at amortised cost:    
-    Principal Sum Borrowed 490,575 439,933 256,361 243,715
-     Accrued Interest - - 4,242 3,865
-     EIR Adjustments - - 2,537 2,518
Total Borrowings  490,575 439,933 263,140 250,098     
-    Provisions: Financial Guarantees 152 55 101 97     
Other Long-term Liabilities at
amortised cost: 
-     Finance Leases 1,711 1,543 190 221
-     PPP and similar arrangements 172,194 165,402 7,068 6,792
Total Other Long-term Liabilities 173,905 166,945 7,258 7,013     
*Creditors - - 171,465 156,287
Total Financial Liabilities 664,632 606,933 441,964 413,495     
Financial Assets: 
At amortised cost :    
-     Principal Sum Invested 1,189 1,170 70,386 73,823
-     Accrued Interest - - 3 22     
At fair value through profit & loss :    
-     Principal Sum Invested - - 40,000 39,990
-     Accrued Interest - - - 11     
**Debtors - - 41,806                49,861     
Interest in Subsidiaries Associates
and Joint Ventures.
- - - -     
Total Financial Assets  1,189 1,170 152,195 163,707
* The creditors amount quoted within the table above represents trade creditors, other entities and individuals
included within Note 21. 
**The debtors amount quoted within the table includes trade debtors, other entities and individuals included within
Note 19 and is shown net. 
Page 127 of 209

Page 128

Annual Accounts 2021/22
Notes to the Accounts 
- 46 -
For the year ended 31 March 2022 the element of long-term liabilities/assets that fall due for payment or receipt on
or within 12 months has been treated as current within the above table. The amounts which relate to long-term
liabilities, shown within the current category, comprise Public Work Loans Board debt of £35.394m of principal, and
accrued PWLB interest of £3.036m. This category also includes market loan debt of £15.000m, accrued market
loan interest of £0.750m and a cumulative effective interest rate adjustment of £2.518m plus £0.248m in respect of
Salix interest free loan debt. The amount which relates to the long-term financial assets, shown within current
category is £0.089m in relation to subordinated debt investments under ‘hubco’ arrangements as described later
in the section below.
The Financial Assets current category, shown at amortised cost, held for a period of less than one year, include
the bank current accounts / call accounts with no adjustment having been made to the amortised cost to reflect
expected credit losses. This is based on an analysis of the type of assets held which are considered to have a low
risk of default with reference to historic default data published by credit rating agencies. The financial assets are
held on a short-term basis, primarily overnight, thus reducing the impact of any longer-term potential adverse
changes in economic and business conditions that may reduce the ability of the borrower to fulfil the obligations.
At the balance sheet date, based on the credit ratings of the financial institutions in which the funds are held, it is
recognised that the borrower has a strong capacity to meet the contractual cashflow obligations in the near future.
As there has been no significant increase in credit risk since initial recognition, an assessment of potential 12-
month credit loss was carried out and based on the aforementioned assumptions and materiality no adjustment for
credit losses has been made.  
For Financial Assets held at fair value through profit & loss, a calculation of expected credit loss is not required as
the value stated, by its very nature, will include an adjustment for credit loss allowances. Financial Assets classified
as fair value through profit and loss represent funds held in Money Market Funds, with the fair value deemed to be
a close approximation to the principal sum invested, due to the margins in which these funds operate and therefore
the amount shown has not been adjusted for a gain or loss on the principal sum invested.
Those Financial Assets measured at amortised cost or fair value through profit and loss shown within current,
where appropriate, are included within the Cash and Cash Equivalents (Note 20).
The Financial Assets held at amortised cost also include the Council’s investment in subordinated debt for two of
its school projects delivered via the South West Hubco model, with the overall balance invested of £1.259m
outstanding, shown as £1.170m long-term and £0.089m short-term. This ‘hubco’ is a special purpose vehicle set
up for the purposes of ring-fencing individual Design, Build, Finance and Maintain (DBFM) projects under
Scotland’s Schools for the Future national investment programme.  The balance shown has not been adjusted to
reflect a 12-month credit loss allowance, as due to the nature of the investment and the Council’s interest in the
underlying asset, there is a low risk of default with any adjustment, after assessment, having been deemed to be
immaterial. This assessment takes into account the level of income for the ‘hubco’ being relatively stable, with the
revenue to meet the commitments, primarily due under a long-term contract with the Council. The assessment
considered the probability of no default, probability of default up to 6 months and probability of default up to one
year with an estimation of a loss given default and the probability of each combination of events occurring for the
cashflows due.
The Council adopt the simplified approach for trade/rents receivables under which impairment losses are
automatically based on lifetime expected credit losses, removing the need to consider changes in credit risk since
initial recognition and the possibility that appropriate measure should be 12-month expected credit losses. To arrive
at the expected credit loss for trade receivables an analysis was carried out by examining previous repayment
patterns considering the different time horizons over which the debt remained unpaid but did not default, adopting
this approach to measure the probability of default. Despite changing the measurement basis there was no material
difference between the previous bad debt provisions and the amount arrived at using the expected credit loss
approach. 
Page 128 of 209

Page 129

Annual Accounts 2021/22
Notes to the Accounts 
- 47 -
Income, Expense, Gains and Losses on Financial Instruments 
The gains and losses recognised in the Comprehensive Income and Expenditure Statement and Movement in
Reserves Statement in relation to financial instruments are made up as follows: 
31 March 2021  31 March 2022 
Financial
Liabilities  Financial Assets 
Financial
Liabilities Financial Assets 
Measured at
amortised
cost 
Measured at
amortised
cost
Measured
at FV
through
Profit and
Loss 
Total
Measured at
amortised
cost
Measured at
amortised
cost 
Measured at
FV through
Profit and
Loss  Total 
£000 £000 £000 £000 £000 £000 £000 £000
Interest Expenses (23,248) - -     (23,248) (20,355) - - (20,355)
PPP Unitary
Charge Interest       
(13,957) - -   (13,957)        (13,598) - - (13,598)
Finance Lease
Interest 
(147) - -     (147) (135) - - (135)
Impairment of
Financial Assets
- (5,694) - (5,694) - (4,123) -     (4,123)
Total Expense  (37,352) (5,694) - (43,046) (34,088) (4,123) - (38,221)         
Interest Income - 566 161 727 - 216 14 230
Gain on            
De-recognition
- 9 - 9 - - - -
Financial
Guarantee
Premium
- 106 - 106 - 101 - 101
Total Income - 681 161 842 - 317 14 331
Net (Loss) / Gain
for the year
(37,352) (5,013) 161 (42,204) (34,088) (3,806) 14 (37,890)
Notional gains and losses on ‘Soft Loans’ are not considered material and accordingly are not recognised in the
Comprehensive Income and Expenditure Statement.
The impairment of financial assets relates to the loss on trade receivables/rents receivables written off in the year
whilst as stated above, the Council has made no adjustments to reflect expected credit losses based on materiality
and an assessment of likelihood of default for its other financial assets measured at amortised cost. Therefore, the
table above includes the loss recognised in the Comprehensive Income and Expenditure Statement in respect of
lifetime credit losses. 
17.2. Fair Value of Assets and Liabilities Carried at Amortised Cost
Where the fair value is deemed to be different from the amortised cost as presented within balance sheet for both
Financial Liabilities and Financial Assets the fair value amount is shown in the following table.
The principal amount shown in the table represents the actual value of the monies receivable or debt payable not
arising from any adjustments whilst the carrying amount reflects the amortised cost including accrued interest up
to and including the valuation date.  
Page 129 of 209

Page 130

Annual Accounts 2021/22
Notes to the Accounts 
- 48 - 
Fair 31 March 2021
Restated    
31 March 2022               
Value
Level
Principal 
Amount
Carrying
Amount
Fair Value  
Amount
Principal
Amount
Carrying
Amount
Fair Value     
Amount 
Financial Liabilities   £000 £000 £000 £000 £000       £000
PWLB Debt 2 434,585 437,844 551,896 407,349 410,385 469,557
Non PWLB Debt 2 312,351 315,871 368,707 276,299 279,646 313,577
Financial Guarantee - 253 253 253 152 152 152
Finance Leases 2 1,901 1,901 2,443 1,764 1,764 2,077
PPP & similar
arrangements 2 179,262 179,262 230,734 172,194 172,194 200,905
Creditors1 - 171,465 171,465 171,465 156,287 156,287 156,287
Total Financial Liabilities  1,099,817 1,106,596 1,325,498 1,014,045 1,020,428 1,142,555 
Financial Assets       
At Amortised Cost   2 71,575 71,578 71,578 74,993 75,015 75,015
At Fair Value through
Profit and Loss
1 40,000 40,000 40,000 39,990 40,001 40,001
Debtors2 - 41,806 41,806 41,806 49,861 49,861 49,861        
Total Financial Assets   153,381 153,384 153,384 164,844 164,877 164,877
1 The creditors amount quoted within the table above represents trade creditors, other entities and individuals
included within Note 21. 
2 The debtors amount quoted within the table includes trade debtors, other entities and individuals included within
Note 19.   
The fair value of a financial instrument is the price that would be received when selling an asset, or the price that
would be paid when transferring a liability, to another market participant in an arms’-length transaction. Where
liabilities are held as an asset by another party, such as the Council’s borrowing, the fair value is estimated from
the holder’s perspective.
Financial instruments, except those classified at amortised cost, are carried in the Balance Sheet at fair value which
is taken from the market price.
Financial instruments classified at amortised cost are carried in the Balance Sheet at their amortised cost.  Their
fair values disclosed below have been estimated by calculating the net present value of the remaining contractual
cash flows at 31st March 2022, using the following methods and assumptions: 
• Loans borrowed by the Council have been valued by discounting the contractual cash flows over the whole life
of the instrument at the appropriate market rate for local authority loans.
• Discount rates for “Lender’s Option Borrower’s Option” (LOBO) loans have been reduced to reflect the value of
the embedded options. The size of the reduction has been calculated using proprietary software. 
• The fair values of other long-term loans and investments have been discounted at the market rates for similar
instruments with similar remaining terms to maturity on 31 March 2022.
• The fair values of financial guarantees have been estimated based on the likelihood of the guarantees being
called and the likely payments to be made.
• The fair values of finance lease assets and liabilities and of PFI scheme liabilities have been calculated by
discounting the contractual cash flows (excluding service charge elements) at the appropriate AA-rated
corporate bond yield.
• No early repayment or impairment is recognised for any financial instrument.
• The fair value of short-term instruments, including trade payables and receivables, is assumed to approximate
to the carrying amount given the low interest rate environment.
• For financial assets classified as fair value through profit and loss, these represent funds held in Money Market
Funds which are carried in the balance sheet at fair value. These funds being invested in low volatility NAV
funds.   
• The financial assets shown at amortised cost as current, are due to mature in less than one year and for these
balances it has been assumed that the carrying amount will represent a reasonable approximation to fair value.
This approach has also been applied to the financial assets shown at amortised cost and original cost and
Page 130 of 209

Page 131

Annual Accounts 2021/22
Notes to the Accounts 
- 49 -
categorised as long-term, given the size and nature of the investment under consideration with any differential
likely to be immaterial.
The interest rate swap used to calculate the local authority margin is determined from two sources:
 Up to 5 years: the rates available to borrowers in the local authority loan market on 31 March 2022 sourced
from brokers active in this market.
  Over 5 years: the yields on actively traded local authority bonds, of which the majority are issued by
Transport for London as quoted by Bloomberg on 31 March 2022.
Where applicable fair values are shown in the table above split by their level in the fair value hierarchy:
- Level 1: fair value is only derived from quoted prices in active markets for identical assets or liabilities e.g. bond
prices
- Level 2: fair value is calculated from inputs other than quoted prices in active markets that are observable for
the asset or liability e.g. interest rates or yields for similar instruments
- Level 3: fair value is determined using unobservable inputs e.g. non market data such as cash flow forecasts
or estimated credit worthiness. 
17.3. Nature and Extent of Risks arising from Financial Instruments
Treasury Management activity by its very nature exposes the Council to a variety of financial risks with the Council's
overall risk management procedures focusing on the unpredictability of financial markets and implementing
restrictions to minimise these risks.  The procedures for risk management are set out through a legal framework in
the Local Government in Scotland Act 2003 and the associated regulations. In accordance with the Council's
financial regulations, the Council has adopted the CIPFA’s Code of Practice (the Code) on Treasury Management
in the Public Services and Prudential Code for Capital Finance in Local Authorities, both revised in December 2021
including the key principles within Section 4, formally adopting the clauses within Section 5 and the suggested
treasury management policy statement within Section 6.
The Council regards the successful identification, monitoring and management of risk to be the prime criteria by
which the effectiveness of its treasury management activities will be measured.  Accordingly, the analysis and
reporting of treasury management activities focuses on their risk implications for the organisation. It acknowledges
that effective treasury management will provide support towards the achievement of its business and service
objectives.  It is therefore committed to the principles of achieving value for money in treasury management, and
to employing suitable performance measurement techniques, within the context of effective risk management.
The Council has in place suitable treasury management practices (TMPs), setting out the manner in which the
Council will seek to achieve those policies and objectives, prescribing how it will manage and control those
activities. These TMPs are a requirement of the Code of Practice within Section 7 and are implemented by the
Council’s Treasury Management team and are reviewed regularly.
The Council manages its risk in the following ways:
• by formally adopting the requirements of the Code of Practice;
• by approving annually in advance prudential indicators for the following three years, limiting:
o The Council’s overall borrowing (Authorised Limit & Operational Boundary);
o Its maximum and minimum exposures with regard to the Maturity Structure of its Debt.
These items are reported within the Council’s Annual Treasury Management Strategy which is approved by the
Council prior to the commencement of each financial year. This report outlines the approach to managing risk in
relation to the Council’s financial instrument exposure for the year ahead. The Council will monitor its interest rate
exposure by monitoring the proportion of fixed interest rate costs to variable interest costs to identify if there are
any potential risks if interest rates were to move significantly upwards.  The Council will also monitor debt maturity
profile, the spend profile of the capital programme and also continue to adopt a prudent approach to use of internal
balances in lieu of future long-term borrowing i.e. monitor under borrowing position.  The economic outlook and
interest rate forecast will supplement this on-going review of interest rate exposure.
Actual performance is monitored on a quarterly basis with any significant variation from the strategy reported to
Members. In line with the recommendations of the Code of Practice, a mid-year review is carried out and an Annual
Treasury Report on the year’s activity is submitted to members once the final accounts are complete and the outturn
prudential indicators for 2021/22 have been calculated.  
Page 131 of 209

Page 132

Annual Accounts 2021/22
Notes to the Accounts 
- 50 -
Credit Risk
Credit risk arises from the short-term depositing of surplus funds to banks, building societies and other local
authorities, as well as credit exposures to the Council’s customers including house rents and external debtors. The
credit risk relates to the possibility that these other parties might fail to pay the amounts due to the Council. The
Council manages its investments in accordance with the Local Government Investments (Scotland) Regulations
2010, including the preparation of an Annual Investment Strategy.
The Council’s principal investment criteria, stipulated within the 2021/22 Treasury Management Strategy,
prescribed that short-term deposits could be made with banks, building societies and local authorities based on a
Lowest Common Denominator (LCD) approach. This allows the selection of counterparties that must meet a pre-
determined credit-rating level to which monetary and time limits can then be applied. Therefore the counterparty is
assessed by its weakest set of ratings, rather than its’ strongest. The Council utilises the research of the world’s
foremost providers of independent credit ratings (Fitch, Moody’s and Standard and Poors). These ratings are
monitored by the Council's Treasury Management team and procedures are put in place with the Council’s Treasury
advisers to ensure that the Council is notified immediately of any negative/positive movements which will affect the
Council’s counterparty list.
The Council also has a HM Treasury backed Debt Management Account Deposit facility. During 2021/22 the
Council's Investment Strategy was robust, with sufficient options available to spread deposits over a wide range
and category of financial institutions with due consideration given to country, group and sector exposure of the
Council's investments.
Whilst the above criteria rely primarily on the application of credit ratings to provide a pool of appropriate
counterparties the Council supplemented this by accessing other market information. This additional market
information is applied to compare the relative security of differing investment counterparties and included credit
default swap prices, quality financial press commentary, share prices, annual reports, and statements to the
financial market including the stock market.
The Council does not generally allow credit for its external debtors or house rents receivable.  The past due amount
can be analysed by age as follows: 
31 March 2021 (Restated) 31 March 2022 
House
Rents etc
Receivable
Central
Government
Grants
External
Debtor
Accounts
Due
House
Rents etc
Receivable
Central
Government
Grants
External
Debtor
Accounts
Due 
£000 £000 £000 £000 £000 £000       
Less than three months 6,063 27,598 6,454 5,705 14,548 5,708
Three to six months 3,027 - 628 1,767  415
Six to twelve months 1,854 - 567 1,960  774
More than one year 1,238 - 6,073 2,467  5,176
Debt Outstanding   12,182 27,598 13,722 11,899 14,548 12,073       
Expected Credit Losses (8,778) - (3,774) (8,900) - (3,068)
Average allowance for
Expected Credit Loss (%)  72.1%  0%  27.5%  74.8%  0%  25.4%
Total Debtors 3,404 27,598 9,948 2,999 14,548 9,005
The table above excludes prepayments and VAT recoverable whilst also excluding amounts relating to Council
Tax, Non Domestic Rates and Community Charge as these are deemed to be statutory debts not arising from
contracts.  Central Government Grants and External Debtors Accounts due are included within Note 19 Short-Term
Debtors as part of the total debtors due.
Loss allowances on trade receivables have been calculated with reference to the Council’s historic experience of
default, adjusted to reflect current and forecast economic conditions.  The average percentage allowance for
expected credit losses are shown in the table above.
Provisions: Financial Guarantee 
In 2013/14 the Council agreed to provide North Lanarkshire Properties LLP (NLP LLP) with a financial guarantee,
underwriting the debt service costs of the NLP LLP loan of £45.000m to the lender, up to a limit of 80% of the total
debt service costs. The Council considers the likelihood of the guarantee being called as minimal. In recognition of
this financial guarantee the Council made an initial provision of £1.114m which has now been revised to £0.152m.
The financial guarantee was assessed under IFRS9 Financial Instruments and has been valued at the amount
initially recognised (i.e. fair value) less any cumulative amount of income /amortisation recognised. This valuation
Page 132 of 209

Page 133

Annual Accounts 2021/22
Notes to the Accounts 
- 51 -
recognised as higher than the alternative measurement basis available based on the IFRS9 Expected Credit Loss
Allowance with the higher value the recognised provision.   
The Council has agreed with the NLP LLP that the premium payable to the Council for providing this guarantee will
be paid in annual instalments on a fair value basis over the term of the loan.  The Council has therefore included a
long-term debtor of £0.055m and a short-term debtor of £0.097m within the Balance Sheet to reflect this
arrangement.  
Soft Loans
The Council has recognised an amount receivable of £1.465m within Long-Term Debtors (2020/21 – £1.384m),
representing the amounts due from service users receiving social care for which a charging order has been placed
on the recipient’s property as a method of recovering the debt, with a total of £2.365m of amounts recoverable
(2020/21 - £2.330m) adjusted to reflect an expected credit loss allowance of £0.901m (2020/21 - £0.946m). The
expected credit loss calculation is based on an assessment of likelihood of default and no default based on past
historical default levels and other information available including the property subject to the charging order being
on the market for sale at the balance sheet date or alternatively where the balance outstanding exceeds the value
of the property subject to the charging order.    
The Council offer a small number of properties at below market rents to assist in the economic regeneration and
development of the area and to support key Council objectives, however these are not considered to be of sufficient
size to meet the Council’s materiality reporting level. 
Liquidity Risk
• Liquidity risk – the possibility that the Council might not have funds available to meet its commitments to make
payments.
The Council has ready access to borrowings from the Money Markets to cover any day to day cash flow need, and
whilst the PWLB provides access to longer term funds, it also acts as a lender of last resort to Councils (although
it will not provide funding to a Council whose action is unlawful).  The Council is also required to provide a balanced
budget through the Local Government Finance Act 1992, which ensures sufficient monies are raised to cover
annual expenditure.  There is therefore no significant risk that it will be unable to raise finance to meet its
commitments under financial instruments.  
The Council manages its liquidity position through the risk management procedures above. This includes the setting
and approval of the Council's Annual Treasury Management Strategy incorporating Prudential Indicators limiting
the Council’s maximum and minimum exposures with regard to the maturity structure of its debt. The Council also
has in place robust cash flow procedures as required by the Code of Practice, maintaining liquid short-term deposits
of at least £3.000m if required at short notice.
Re-financing and Maturity Risk
• Re-financing risk – the possibility that the Council might require to renew a financial instrument on maturity
at disadvantageous interest rates or terms.
The Council maintains a significant debt and investment portfolio.  Whilst the cash flow procedures above are
considered against the refinancing risk procedures, longer term risk to the Council relates primarily to managing
the exposure to replacing financial instruments as they mature.  
The approved prudential indicator limit for the maturity structure of debt is the key parameter used to address this
risk.  The Council approved Treasury Management Strategy, including the setting and approval of prudential
indicators, addresses the main risks and the Treasury Management Team addresses the operational risks within
the approved parameters.  This includes:
• monitoring the maturity profile of financial liabilities and amending the profile through either new borrowing or
the re-scheduling of the existing debt; and
• monitoring the maturity profile of short-term investments to ensure sufficient liquidity is available for the
Council’s day to day cash flow needs.
Page 133 of 209

Page 134

Annual Accounts 2021/22
Notes to the Accounts 
- 52 -
The maturity analysis of financial liabilities incorporating PWLB Debt, Non PWLB debt based on principal outstanding
is as follows: 
At 31 March 2021 At 31 March 2022 
£000 £000
Less than one year 256,361 243,716
Between one and two years 50,642 
26,586
Between two and seven years 98,422 83,007
Between seven and fifteen years 100,564 100,392
More than fifteen years 240,947 229,947
Total 746,936 683,648
It should be noted that the debt maturity profile above includes principal outstanding for LOBO (Lender’s Option
Borrower’s Option) loans based on their maturity date as opposed to the potential maturity date in the year where
options or calls exist. A LOBO is called when the lender exercises its right to amend the interest rate on the loan at
which point the Council can accept the revised terms or reject them and repay the loan. 
The Council currently has a £13.0m exposure to LOBO loans, all of which have a call date falling within less than
one year. The interest rates on the LOBO loans held range from 6.40% to 10.937% and based on the current and
the forecast interest rates the likelihood of these loans being called has been assessed as minimal. In the event
that the call option were to be exercised, the default position will be the repayment of the LOBO without penalty
with the associated treasury risks (refinancing/interest rate/liquidity) managed in line with the borrowing strategy
for other maturing debt. The balance of £13.0m comprises £3.0m of vanilla type LOBO’s where the lender has the
option to impose a higher interest rate on certain dates with the Council having the option to repay with the £10m
balance structured as an inverse floater rate loan where interest rates moves are based on a cap /floor ceiling
structured arrangement linked to a 10 year swap rate.        
The maturity analysis for financial liabilities in relation to Finance Lease and PPP arrangements are shown within
Notes 24.1 and 25.3 respectively.
All trade and other payables are due to be paid in less than one year and external debtors (net of expected credit
losses) are not shown in the table above.
At the 31 March 2022, the Council as permitted by its investment strategy, as outlined within section 17.1, has a
total investment of £1.259m in subordinated debt in relation to two school projects. The first investment taken out
in 2015/16 in relation to the Greenfaulds High School as a Design, Build, Finance and Maintain (DBFM) project in
partnership with hub South West Scotland Ltd. The new school partially opened in 2016/17 with the addition of a
Multi-Use Games Area in 2017/18 completing the final phase in July 2017 with a balance due of £0.904m at 31
March 2022 which includes accrued interest due of £0.045m with the balance of £0.859m repayable on an annuity
basis over 25 years from the initial recognition date. 
In June 2017, the Council entered into a second subordinated debt agreement in relation to Cumbernauld Academy,
as a Design, Build, Finance and Maintain (DBFM) project, in partnership with Hub SW Cumbernauld DBFM Co Ltd.
The new school opened in 2019/20 with the final phase completed in August 2020 with the outstanding balance
due of £0.355m at 31 March 2022 which includes accrued interest due of £0.017m with the balance of £0.338m
repayable on an annuity basis over 25 years from the initial recognition date. 
Due to the size and nature of the investment and the investor relationship between the Council and the ‘hubco’,
both these investments are considered to have a minimum impact upon the credit risk profile for the Council.
Market Risk
• Market risk - the possibility that financial loss might arise for the Council as a result of changes in such
measures as interest rates, prices and foreign exchange rates.
Market Risk – Interest Rates
The Council is exposed to interest rate movements on its borrowings and investments.  Movements in interest rates
have a complex impact on the Council, depending on how variable and fixed interest rates move across differing
financial instrument periods.  For instance, a rise in variable and fixed interest rates would have the following
effects:
• borrowings at variable rates – the interest expense charged to the Comprehensive Income and Expenditure
Statement will rise;
• borrowings at fixed rates – the fair value of the borrowing liability will fall;
• investments at variable rates – the interest income credited to the Comprehensive Income and Expenditure
Statement will rise; and
Page 134 of 209

Page 135

Annual Accounts 2021/22
Notes to the Accounts 
- 53 -
• investments at fixed rates – the fair value of the assets will fall.
Borrowings are not carried at fair value on the balance sheet, so nominal gains and losses on fixed rate borrowings
would not impact on the Comprehensive Income and Expenditure Statement or Movement in Reserves Statement.
However, changes in interest payable and receivable on variable rate borrowings and investments will be posted
to the Comprehensive Income and Expenditure Statement and affect the General Fund Balance, subject to
influences from Government grants.  
The Council has a number of strategies for managing interest rate risk.  The Annual Treasury Management Strategy
draws together the Council’s prudential and treasury indicators and its expected treasury operations, including an
expectation of interest rate movements.  The Council will monitor its interest rate exposure by the local indicator
shown in the tables below. To monitor its interest rate exposure, the proportion of fixed interest rate costs to variable
interest costs is monitored on a quarterly basis to identify if there are any potential risks if interest rates were to
move significantly upwards.   
The risk of interest rate loss is partially mitigated by the government grant payable on financing costs. However,
the correlation between a 1% movement and the potential change in grant levels is not readily identifiable due to
the complexity of the grant allocation methodology adopted within the Local Government Settlement. Therefore,
the impact on government grants receivable has been excluded from the table below.  
If all interest rates had been 1% higher with all other variables held constant the financial effect would be: 
£000
Increase in interest payable on variable rate borrowings 150
Increase in interest receivable on variable short-term investments (709)
Overall Impact on Comprehensive Income and Expenditure Statement (559)  
Share of Overall impact debited to the HRA (228)
If all interest rates had been 1% lower with all other variables held constant the financial effect would be: 
£000
Decrease in interest payable on variable rate borrowings (150)
Decrease in interest receivable on variable short-term investments 59
Overall Impact on Comprehensive Income and Expenditure Statement (91)  
Share of Overall impact debited to the HRA (37)
In terms of the impact on the fair value of fixed rate borrowings/liabilities this would have no impact upon the
Comprehensive Income and Expenditure Statement or Movement in Reserves Statement. Per the assumptions
and adopting the same methodology as used in 17.2 Fair Value of Assets and Liabilities carried at Amortised Cost,
a 1% increase and decrease in the prevailing swap rates and inter authority margins would have the following
implications in terms of the fair value. Where a reduction of 1% would result in a rate less than zero being applied,
the fair value has been calculated using a negligible redemption rate of 0.001%.  
+1% -1% 
£000 £000
Total Movements in Fair Value of Fixed Rate Borrowings (68,849) 80,833    
For Financial assets shown at amortised cost it has been assumed that the carrying amount will represent a
reasonable approximation to fair value thus the impact on the fair value of investments and subsequent impact on
the Movement in Reserves Statement as a result of an increase in the interest rate of 1% has not been included
within the table above.
Market Risk – Prices
The Council has an interest in a number of Subsidiary and Associate Companies along with Joint Ventures.
Information as to the role of the Council in respect of these interests is provided by way of a separate note within
the Group Accounts (Note 2 to the Group Accounts).  For each of these interests the Council will account for its
share of assets, liabilities, and trading surplus or deficit within the Group Accounts dependant on the specific nature
of the relationship in line with proper accounting practice. 
As the shareholdings have arisen in the acquisition of specific interests, the Council is not in a position to limit its
exposure to price movements by diversifying its portfolio.  Instead it may only acquire shareholdings in return for
“open book” arrangements with the company concerned. The Council manages the risk in this area by exerting
influence within the limits of its holdings, monitoring factors that might cause a fall in the value of specific
shareholdings.
Page 135 of 209

Page 136

Annual Accounts 2021/22
Notes to the Accounts 
- 54 - 
18. Inventories
The Council holds stocks of consumable materials such as fuel and catering supplies. The movements in the year
can be summarised as follows: 
2020/21 2021/22  
£000 £000     
Opening Balance at 1 April 1,728 1,891    
Purchases 7,925 9,378
Donations 1,085 -
Recognised as an expense in the year (8,840) (8,641)
Write Off Balances (7) (99)    
Closing Balance at 31 March 1,891 2,529
19. Short-Term Debtors
The Short-Term Debtors balance consists primarily of debts in respect of Council Tax, External Debtors Accounts
and other Sundry Debtors. This can be summarised as follows: 
2020/21  2021/22 
£000 £000 £000 £000     
Central Government Bodies  46,556        19,614
Other Local Authorities  1,687  1,001
NHS Bodies  8,401  1,879
Public Corporations and Trading Funds  26  2
Trade Debtors, Other Entities and Individuals  41,806  49,861
Provision for Expected Credit Losses  (4,751)  (4,288)     
House Rents Receivable:     
Rents Receivable 12,182  11,899 
Less Expected Credit Losses (8,778) 3,404 (8,900) 2,999     
Arrears in Local Taxation:     
Council Tax 115,598  118,506 
Less Provision (98,017) 17,581 (103,469) 15,037             
NNDR Statutory Addition 5,035  5,550 
Less Provision (5,035)  (5,190) 360      
Total Debtors  114,710   86,465
20. Cash and Cash Equivalents 
2020/21  2021/22 
£000 £000
Cash held by the Council  480 499
Bank current accounts / call accounts 70,301 73,756
Money Market Funds  40,000 40,001   
Net Cash and Cash Equivalents 110,781 114,256   
Page 136 of 209

Page 137

Annual Accounts 2021/22
Notes to the Accounts 
- 55 -
21. Short-Term Creditors
The Short-Term Creditors balance consists primarily of amounts due in respect of payroll costs, payovers to HMRC and
other sundry creditors. This can be summarised as follows: 
2020/21 2021/22 
£000 £000   
Central Government  (2,960) (6,201)
Other local authorities (4,048) (2,706)
NHS Bodies (318) (4,895)
Public Corporations and Trading Companies (762) (694)
Trade Creditors, Other Entities and Individuals (125,753) (156,287)
Short-term compensated absences (1) (22,995) (21,717)   
Total Creditors (156,836) (192,500)   
(1) For the notional accrued cost of benefits employees receive as part of their contract of employment,
entitlement to which is built up as they work for the Council. The balance relates to holiday entitlement. 
22. Provisions
(1) The Council has previously recognised the need to provide for on-going commitments arising from equal pay
compensation claims.  The provision is reviewed annually with consideration given to the scale and scope of
any risk and uncertainties.  
(2) In 2012/13, a provision was recognised for the future costs associated with the restoration of Auchinlea landfill
site. Additional provisions were made in 2020/21. During 2021/22 £0.171m of the provision was utilised. 
(3) Refer to Provisions: Financial Guarantee note within Note 17 Financial Instruments
23. Contingent Assets and Liabilities
Contingent assets represent items that at 31 March 2022 are not recognised in the Council’s Annual Accounts
because there is significant uncertainty at that date as to the likelihood that the Council will receive payments in
respect of them. Contingent liabilities represent items that at 31 March 2022 are not recognised in the Council’s
Annual Accounts because there is significant uncertainty at that date as to the necessity of the Council to make
payments in respect of them.
A number of legal actions have been brought against the Council in respect of Equal Pay. Notification has also
been received of a number of other cases that are not yet subject to Court action but which may result in subsequent
litigation. Due to the wide variety and nature of the claims and the uncertainty of any potential liability, no value has
been attributed to these claims in the financial statements.
The Council has received notification of a number of legal claims in respect of contract disputes. Due to the wide
variety and nature of the claims and the uncertainty of any potential liability, no value has been attributed to these
claims in the financial statements. 
On 20 July 2020, a Written Ministerial Statement (WMS) was issued in relation to survivor benefits for Public Service
Pensions. The 2017 Supreme Court ruling in Walker vs Innospec, along with subsequent amendments entitled
same-sex survivors pension benefits to take account of the member’s service from 6 April 1987. On 30th June 2020,
the Goodwin Tribunal ruled that this should also apply to male survivors of opposite-sex marriages. The Goodwin
Tribunal was in relation to the Teachers’ Pension Scheme, however the WMS confirmed that this difference in
treatment would also need to be remedied in other public sector pension schemes. Whilst there is still uncertainty
surrounding the potential remedy, the Council’s actuaries carried out some approximate analysis and concluded 
Balance
at 
31 March
2020
Additional
Provisions
Made in
2020/21
Amounts
Used in
2020/21
Balance at 
31 March
2021 
Additional
Provisions
Made in
2021/22
Amounts
Used in
2021/22
Balance at 
31 March
2022 
£000 £000 £000 £000 £000 £000 £000        
Equal Pay (1) 5,757 - (151) 5,606 - (558) 5,048
Landfill (2)  188 7,734 (258) 7,664 - (171) 7,493
Financial Guarantee (3) 359 - (106) 253 - (101) 152        
Total Provisions 6,304 7,734 (515) 13,523 - (830) 12,693
Page 137 of 209

Page 138

Annual Accounts 2021/22
Notes to the Accounts 
- 56 -
that the impact of the judgement is likely to be very small and therefore have not accounted for this within their
calculations. This could have a financial impact on future years’ costs, however given the uncertainty no provision
has been made in the Accounts.
The Limitation (Childhood Abuse) (Scotland) Act 2017 which came into force in October 2017 removed the time
bar for survivors of historical child abuse to make a claim for compensation in the civil courts. On 23 April 2021 the
Redress for Survivors (Historical Child Abuse in Care) (Scotland) Act 2021 received Royal Assent. The Act
introduces a scheme to make financial payments to survivors of historical child abuse in care in Scotland and sets
out that Scottish Ministers must establish a list of organisations who have agreed to make a fair and meaningful
contribution towards the funding of the redress payments. In return, survivors who accept a redress payment agree
not to take legal action against these organisations or the Scottish Government. Potential claim volume and values
cannot be quantified at this time therefore no financial provision has been made.  
The Council is unaware of any other material contingent asset or liability as at 31 March 2022. 
24. Leases
24.1. Council as a Lessee – Finance Leases
The balance held on Property, Plant and Equipment for the remaining overcladding programme is included within
the HRA Council Dwellings valuation, and computer equipment transferred as part of the CLNL Insourcing is
included within Vehicles, Plant & Equipment valuation.
The Council is committed to making minimum payments under these leases comprising settlement of the long-term
liability for the interest in the asset acquired by the Council and finance costs that will be payable by the Council in
future years while the liability remains outstanding.  The minimum lease payments are made up of the following
amounts:  
2020/21 2021/22  
£000 £000
Finance lease liabilities   
          Current 190 221
          Non-current 1,711 1,543
Finance costs payable in future years 643 510    
Minimum lease payments 2,544 2,274
The minimum lease payments will be payable over the following periods:  
Minimum Lease Payments Finance Lease Liabilities  
2020/21 2021/22 2020/21 2021/22  
£000 £000 £000 £000
Not later than one year 325 344 190 221
Later than one year and not later than five years 1,299 1,336 905 1,005
Later than five years 920 594 806 538
Total 2,544 2,274 1,901 1,764
24.2. Council as a Lessee – Operating Leases
The Council leases various properties as a tenant on a variety of lease terms that are accounted for as operating
leases. The rentals payable in 2021/22 were £3.508m (2020/2021 £3.419m). The Council also leases various
vehicles, plant and equipment on lease terms that are typically between one and five years. The rentals payable in
2021/22 were £0.927m (2020/21 £1.210m). Rental charges for operating leases have been included in the
Comprehensive Income and Expenditure Statement. The future minimum lease payments under non-cancellable
leases in future years are as follows:  
Page 138 of 209

Page 139

Annual Accounts 2021/22
Notes to the Accounts 
- 57 -  
Operational Buildings Vehicles, Plant &
Equipment  
2020/21 2021/22 2020/21 2021/22  
£000 £000 £000 £000
Not later than one year 854 854 921 483
Later than one year and not later than five years 2,294 2,294 666 231
Later than five years 1,002 579 - -
Total 4,150 3,727 1,587 714
The Council has sub-let a number of these buildings and the minimum lease payments expected to be received
from these sub leasing agreements is £0.046m (2020/21 £0.026m).
24.3. Council as a Lessor – Operating Leases
The Council leases out property under operating leases for the purposes of economic development to provide
suitable affordable accommodation for local businesses. These arrangements are accounted for as operating
leases. The rental income receivable in 2021/22 was £1.304m (2020/21 £1.289m) and is included in the
Comprehensive Income and Expenditure Statement.  The rents receivable under non-cancellable leases in future
years are shown in the table below. 
Future Rental Income Receivable 
2020/21 2021/22 
£000 £000   
Within one year 901 930
Later than one year and not later than five years 1,530 1,508
Later than five years and not later than ten years 1,769 1,783
Later than ten years and not later than fifty years  12,526 12,472
Later than 50 years 8,372 8,077   
Total 25,098 24,770
25. Public Private Partnerships and Similar Contracts
In June 2005, the Council entered into a Public Private Partnership for the provision and maintenance of school
and community buildings. The agreement has provided 17 purpose-built facilities consisting of 3 secondary schools,
7 stand-alone primary schools, and 7 primary school joint campus facilities. When the agreement ends on 31 March
2037 responsibility for maintenance and operation transfers back to the Council. However, the Council will only
have to budget for routine maintenance for the first five years following expiry of the agreement because the
contract contains provisions that require the contractor to ensure that the buildings are in a condition to require no
replacement of any significant building element over these five years.
In 2016/17, a further addition to the Council’s school portfolio was the replacement Greenfaulds High School as a
Design, Build, Finance and Maintain (DBFM) project in partnership with Hub South West Scotland Ltd. The school
was fully functional by the end of 2017/18 with the current outstanding DBFM liability incorporated within the
following table. 
In 2019/20, a further addition to the Council’s school portfolio was the Cumbernauld Academy Design, Build,
Finance and Maintain (DBFM) project in partnership with Hub SW Cumbernauld DBFM Co Ltd. Phase 1 and Phase
2a were completed in July 2019 and February 2020 with capital values of £34.188m and £1.545m respectively,
with Phase 2b with a capital value of £1.176m being completed in August 2020. 
The Council has a 40% share in the contract for waste recycling which utilises the waste materials recovery facility
at Bargeddie with residual waste then processed at a thermal treatment in Dunbar. North Lanarkshire is lead
authority and contracted with Viridor, with four other councils tied into the contract through an Inter Authority
Agreement. As a result, in 2019/20 there was an addition of £9.342m which represents its share of use of the asset
under a service concession arrangement with an addition of £1.416m in 2020/21 representing the Council’s share
of capitalised interest recognised in 2020/21 excluded from the capitalised value in 2019/20.  
Page 139 of 209

Page 140

Annual Accounts 2021/22
Notes to the Accounts 
- 58 -
25.1. Property, Plant and Equipment
The assets used to provide services at the schools, along with the Council’s share of the Clyde Valley Waste Plant,
are recognised on the Council’s Balance Sheet. Movements in value over the year are as follows:  
2020/21  2021/22  
£000 £000     
Opening Net Book Value 268,058 277,474   
Additions 2,592 -
Disposals - -
Depreciation charge for the year (5,861) (5,920)
Revaluations in year  12,685 23,199
Closing Net Book Value 277,474 294,753
25.2. Remaining Payments Under The Agreements
The Council makes an agreed payment each year which is increased by inflation and can be reduced if the provider
fails to meet availability and performance standards in any year, but which is otherwise fixed. Payments remaining
to be made under the contracts at 31 March 2022 including an adjustment for inflation and excluding any estimation
of availability and performance deductions are as follows:  
Future
payments for
services
(including
lifecycle
maintenance)
Repayment of liability Finance interest Total  
£000 £000 £000 £000       
Payable within one year 19,487 6,792 13,737 40,016
Payable within two to five years 80,089 31,954 56,781 168,824
Payable within six to ten years 115,301 47,229 69,996 232,526
Payable within eleven to fifteen years 135,462 56,106 67,912 259,480
Payable within sixteen to twenty years 66,374 22,613 6,649 95,636
Payable within twenty one to twenty five
years
36,131 7,501 1,661 45,293
Total 452,844 172,915 216,736 841,775
25.3. Liabilities from PPP Arrangements and Similar Contracts
Although the payments to the providers are described as unitary payments, they have been calculated to
compensate the provider for the fair value of the services they provide, and the capital expenditure incurred, plus
the interest payable whilst the capital expenditure remains to be reimbursed. The liability outstanding to pay to the
providers for the capital expenditure (the outstanding finance lease obligation) is as follows:  
2020/21 2021/22  
£000 £000
Balance outstanding at the start of the year (183,487) (179,262)
Additions during the year (2,592) -
Payments during the year 6,817 7,068
Balance outstanding at year-end (179,262) (172,194)    
Included in Balance Sheet   
Current  (7,068) (6,792)
Non-current (172,194) (165,402)   
Page 140 of 209

Page 141

Annual Accounts 2021/22
Notes to the Accounts 
- 59 -
26. Pension Costs
As part of the terms and conditions of employment of its officers and other employees, the Council offers retirement
benefits. Although these benefits will not actually be payable until an employee retires, the Council has to disclose
a commitment to make the payments at the time that employees earn their future entitlement. The Council
participates in two pension schemes:
• The Strathclyde Pension Fund Local Government Pension Scheme is administered by Glasgow City Council
in accordance with the Local Government Pension Scheme (Scotland) (Administration) Regulations 1998.
This is a defined benefit scheme, meaning that the Council and employees pay contributions into the fund,
calculated at a level intended to balance the pension liabilities with investment assets.
• The Teachers' Pension Scheme is currently administered by the Scottish Public Pensions Agency, an
Executive Agency of the Scottish Government. It provides teachers with defined benefits upon their retirement,
and the Council contributes towards the costs by making contributions based on a percentage of members'
pensionable salaries. However, as the Scheme is not able to identify each body's share of the underlying
liabilities on a consistent and reasonable basis, the pension costs are accounted for as if it were a defined
contribution scheme.
The principal risks to the authority of the scheme are the longevity assumptions, statutory changes to the scheme,
changes to inflation, bond yields and the performance of the equity investments held by the scheme. These are
mitigated to a certain extent by the Scottish Government requirements to charge to the General Fund the amounts
due by statute as described in the accounting policies note.  Property and Private equity comprise £766m of total
NLC assets in the pension fund of £2.7bn (28%). These assets are valued at Level 3 of the Fair Value hierarchy,
meaning they are valued using unobservable inputs and are therefore more volatile in nature. 
In 2021/22, the Council paid £37.896m (£36.931m in 2020/21) to the Scottish Public Pensions Agency in respect
of teachers' retirement benefits, representing an employer contribution of 23.0% (23.0% from 1/9/2019 onwards).
In addition, the Council is responsible for all pension payments relating to previously awarded added years. In
2021/22, these amounted to £5.064m (£5.070m for 2020/21).
26.1. Transactions relating to retirement benefits
The Council recognises the cost of retirement benefits in the Net Cost of Services when they are earned by
employees, rather than when the benefits are eventually paid as pensions. However, the charge required to be
made against Council Tax is based on the cash payable in the year. Consequently, the real cost of retirement
benefits is reversed out of the General Fund in the Movement in Reserves Statement. The following transactions
have been made in the Comprehensive Income and Expenditure Statement and the General Fund Balance /
Housing Revenue Account via the Movement in Reserves Statement: 
2020/21 2021/22  
£000 £000
Comprehensive Income and Expenditure Statement (CIES)   
Included within Net Cost of Service within CIES:   
• Current service cost 77,503 119,672
• Past service cost/(gain) including curtailments
• Effect of Settlements
2,785
-
1,125
-
80,288 120,797
Included within Financing and Investment Income &
Expenditure in CIES:  
• Net  interest expense 8,277 9,318  
8,277 9,318     
Total Post-employment Benefit charged to Surplus or
Deficit on the Provision of Services
88,565 130,115
Other Post-employment Benefits charged to the CIES:
Re-measurement of the net defined benefit liability  52,108  (352,023)
Total Post-employment Benefits charged to the CIES 140,673 (221,908) 
Less Employer’s contributions payable to pension scheme  (51,228)  (55,329)
Impact of Business Combination and Disposals - 16,203
Movement in Pension Reserve 89,445 (261,034)   
Page 141 of 209

Page 142

Annual Accounts 2021/22
Notes to the Accounts 
- 60 -
26.2. Assets and Liabilities in Relation to Post Employment Benefits
A reconciliation of the Council’s share of the present value of Strathclyde Pension Fund’s liabilities is as follows:  
2020/21 2021/22  
£000 £000     
Opening balance at 1 April (2,300,643) (2,820,623)
Current service cost (77,503) (119,672)
Interest cost (53,584) (60,132)
Contributions from scheme participants (13,033) (14,384)
Remeasurement (gains) and losses:  
Actuarial gains/losses arising from changes in demographic
assumptions
72,363 19,023
Actuarial gains/losses arising from changes in financial
assumptions
(566,193) 201,456
Actuarial gains/losses arising from changes in other
experience
50,414 (12,993)
Past service cost including gains/losses on curtailment (2,785) (1,125)
Benefits paid 70,341 69,665
Effect of settlements - (153,919)     
Closing Balance at 31 March (2,820,623) (2,892,704)
A reconciliation of the Council’s share of the fair value of Strathclyde Pension Fund’s assets is as follows:  
2020/21 2021/22  
£000 £000     
Opening balance at 1 April 1,972,898 2,403,433
Interest income 45,307 50,814
Return on assets 448,679 144,537
Contributions from employer 43,711 46,991
Contributions from scheme participants 13,033 14,384
Contributions in respect of Unfunded Benefits 7,517 8,338
Benefits paid
Effect of settlements
(70,341)
-
(69,665)
137,716
Actuarial gains/losses arising from changes in other
experience
(57,371) -
Closing Balance at 31 March 2,403,433 2,736,548 
Page 142 of 209

Page 143

Annual Accounts 2021/22
Notes to the Accounts 
- 61 -
26.3. Local Government Pension Scheme assets
The Council’s share of the Pension Fund’s assets at 31 March is as follows: 
26.4. Reconciliation of Present Value of the Defined Benefit obligation and the Fair Value of Planned Assets
to the Balance Sheet
The present value of unfunded liabilities comprises approximately £45.102m, £88.979m and £14.635m in respect
of LGPS, Teachers’ and Pre-LGR unfunded pensions. For unfunded liabilities as at 31 March 2022, it is assumed
that all unfunded pensions are payable for the remainder of the member’s life.   
2020/21 2021/22 
£000 £000
Cash and cash equivalents                      40,349 69,631   
Equity instruments (by industry type)  
• Consumer 138,388 128,199
• Manufacturing 137,096 120,585
• Energy utilities 25,104 28,478
• Financial institutions 85,076 75,364
• Health and care 67,049 91,446
• Information technology 111,210 158,905
Sub-total equity 563,923 602,977   
Bonds (by sector)  
• Corporate 1 1
Sub-total bonds 1 1   
Property  194,730       230,783   
Private equity 429,880 535,716   
Other investment funds  
• Equities 840,611      1,013,302
• Bonds 325,057 276,388
• Commodities 1,017 940
• Infrastructure 2,429 2,402
• Other 5,003 4,408
Sub-total other investment funds 1,174,117 1,297,440   
Derivatives 433 -   
Total assets 2,403,433 2,736,548  
2020/21 2021/22  
£000 £000     
Fair Value of Employer Assets 2,403,433 2,736,548
Present Value of Funded Liabilities (2,666,350) (2,743,988)
Net (under)/Overfunding in Funded Plans (262,917) (7,440)    
Present Value of Unfunded Liabilities (154,273)  (148,716)
Net Asset/(Liability) (417,190) (156,156)   
Amount in Balance Sheet:  
Liabilities (417,190) (2,892,704)
Assets - 2,736,548
Net Asset/(Liability) (417,190) (156,156)
Page 143 of 209

Page 144

Annual Accounts 2021/22
Notes to the Accounts 
- 62 -
26.5. Fund History
Triennial valuations provide one basis for assessing the overall position of funds (funding basis). Actuaries also
prepare a valuation at 31st March each year on an accounting basis (IAS19 basis). This approach uses a lower
discount rate for long-term liabilities and this tends to produce a more cautious result. The graph below shows the
underlying commitments that the Council has to pay in retirement benefits on an accounting basis. The net liability
of £156.156m has a substantial impact on the net worth of the Council as recorded in the balance sheet, however
the most recent triennial valuation as at March 2020 shows a funding position of 106% therefore it is expected that
future contributions will be sufficient to meet the liabilities. 
26.6. Basis for Estimating Assets and Liabilities
Liabilities have been assessed on an actuarial basis using the projected credit method, an estimate of the pensions
that will be payable in future years dependent on assumptions about mortality rates, salary levels, etc. The
Strathclyde Pension Fund assets and liabilities have been assessed by Hymans Robertson, an independent firm
of actuaries. Estimates for the fund are based on the latest valuation of the scheme as at 31 March 2022. 
2020/21 2021/22      
Mortality Assumptions: 
Longevity at 65 for current pensioners:  
• Men 19.8 19.6
• Women 22.6 22.4
Longevity at 65 for future pensioners:   
• Men 21.2 21.0
• Women 24.7 24.5     
Rate of increase in salaries  3.55% 3.90%
Rate of increase in pensions 2.85% 3.20%
Discount Rate 2.00% 2.70%
The estimation of the defined benefit obligations is sensitive to the actuarial assumptions set out in the table above.
The sensitivity analyses below have been determined based on reasonably possible changes of the assumptions
occurring at the end of the reporting period and that the assumption analysed changes while all the other
assumptions remain constant. The methods and types of assumptions used in preparing the sensitivity analysis
below did not change from those used in the previous period.  
700,000
1,200,000
1,700,000
2,200,000
2,700,000
3,200,000
£'000
Year
Fair value of
employer assets as
at 31st March
Present value of
defined benefit
obligations as at
31st March
Page 144 of 209

Page 145

Annual Accounts 2021/22
Notes to the Accounts 
- 63 - 
Approximate
Monetary Amount
£000
Approximate %
Increase to
Employer Liability    
Rate of increase in salaries (increase by 0.1%) 7,638 0%
Rate of increase in pensions (increase by 0.5%) 46,017 2%
Rate for discounting scheme liabilities (decrease by 0.1%)
1 Year increase in the member life expectancy
54,129
115,708
2%
4%
The principal demographic assumption is the longevity assumption (i.e. member life expectancy).  For sensitivity
purposes, we estimate that a one year increase in life expectancy would approximately increase the Employer’s
Defined Benefit Obligation by around 4%.  In practice the actual cost of a one year increase in life expectancy will
depend on the structure of the revised assumption (i.e. if improvements to survival rates predominantly apply at
younger or older ages).
Asset and Liability Matching Strategy
The main fund (Fund 1) of Strathclyde Pension Fund does not have an asset and liability matching strategy as this
is used mainly by mature funds. The Fund does match, to the extent possible, the types of assets invested to the
liabilities in the defined benefit obligation. As is required by the pensions and investment regulations, the suitability
of various types of investment has been considered, as has the need to diversify investments to reduce the risk of
being invested in too narrow a range. A large proportion of the assets relate to equities (79%) and bonds (10%).
The comparative year’s figures are 76% and 14%. The scheme also invests in properties (8%) and cash (3%), with
comparative year’s figures of 8% and 2%. 
Impact on Council’s Cash Flow
The objectives of the Fund are to keep employers’ contributions at as constant a rate as possible. The Fund has
agreed a strategy to achieve a funding rate of 100% in the long-term. The total contributions expected to be made
by the Council to Strathclyde Pension Fund in the year to March 2022 is £46.193m. The weighted average duration,
i.e. the time until payment of all expected future discounted cashflows, of the defined benefit obligation for Fund
members is 19 years.
The contributions paid by the employer are set by the fund actuary at each triennial valuation (the most recent
being as at 31 March 2020), or at any other time as instructed to do so by the administering authority.  The
contributions payable over the period to 31 March 2024 are set out in the Rates and Adjustments certificate.
The most recent triennial valuation was completed as at March 2020. This shows a funding position of 106% (March
2017; 105%). Employer contributions remain at 19.3% for 2021/22 to 2023/24, the following three years will be set
following completion of the next triennial valuation in 2023/24. The Scheme is a multi-employer defined benefit plan
and employers’ contributions have been determined so that employee and employer rates are standard across all
participating Local Authorities. 
Page 145 of 209

Page 146

Annual Accounts 2021/22
Notes to the Accounts 
- 64 -
27. Usable Reserves
Movements in the Council’s usable reserves are detailed in the Movement in Reserves Statement with further
explanatory information about the movements included in Notes 31 and 32. 
27.1. Merger with CLNL
Assets  £’0000
Cash at Bank  13,380
Trade Debtors Net of Provision 447
Sundry Debtors and Prepayment  227
Stocks 58
Total Assets  14,112  
Liabilities  
Trade Creditors  (1,356)
Sundry Debtors and Accruals  (2,015)
Total Liabilities (3,371)  
Net Asset Transfer  10,741 
Page 146 of 209

Page 147

Annual Accounts 2021/22
Notes to the Accounts 
- 65 -
27.2. General Fund Balance 
Restated
Balance at
31 March
2021
Transfers
Out
Transfers
in
Balance at
31 March
2022 
£000 £000 £000 £000     
Earmarked General Fund Reserves    
COVID-19 Directed Funding 15,203 (14,629) 6,322 6,896
COVID-19 General Funding 14,362 (14,362) 20,655 20,655
COVID-19 Recovery General Fund Contribution 6,500 (3,500) - 3,000
Change Management Fund 10,021 - 19,403 29,424
One off Costs of Savings Programme 12,021 (12,021) - -
Schools Future Contractual Obligations 49,029 - 5,146 54,175
Early Years & Childcare Expansion 11,256 - 2,993 14,249
Strategic Workforce Planning - - 13,000 13,000
Temporary Accommodation - - 9,288 9,288
Energy costs & Other Non Pay Inflation - - 7,220 7,220
2022/23 Budget One-off Investment - - 6,000 6,000
Pupil Equity Fund 3,984 (3,984) 5,122 5,122
Balances held by Schools under Devolved School Management 4,545 (4,545) 3,652 3,652
Digitisation 2,953 (455) - 2,498
Active & Creative Communities - - 2,000 2,000
Business Gateway and Business Recovery 1,510 (73) 263 1,700
Enterprise Contract 1,701 (14) - 1,687
ICT Orders/Refresh & FMS Project Development - - 1,680 1,680
Youth Guarantee Funding - - 2,367 2,367
Winter Reserve - - 1,500 1,500
E&C 21/22 One Off Investment - - 1,146 1,146
Rapid Rehousing 752 (77) 484 1,159
Other Earmarked Funds 6,114 (2,063) 6,042 10,094
Total Earmarked  139,951 (55,723) 114,283 198,511
Contingency Reserve 8,000   8,000
Unallocated Balance 14,229  15,524 29,753
Total General Fund Balance 162,180 (55,723) 129,807 236,264
Balances included within the Other Earmarked Funds line is reviewed annually on the basis of value therefore the
prior year disclosures may differ from the audited 2020/21 annual accounts. 
27.3. HRA Balance 
Balance at
31 March
2021
Transfers
Out
Transfers
in
Balance at
31 March
2022 
£000 £000 £000 £000     
Earmarked HRA Balance    
Temporary Accommodation 8,348 (8,348) - -
Welfare Changes and Financial Insecurity 2,760 (1,180) - 1,580
Ambition 5,054 - - 5,054
Housing Repairs (Potential Demand Increase) 2,500 - - 2,500
HRA Capital Programme (Energy Efficiency) 2,500 - - 2,500
Other 3,419 (2,182) - 1,237
Total Earmarked  24,581   12,871
Unallocated/Held for Risks and Uncertainties 1,402 - 3,753 5,155
Contingency Reserve 1,470 - - 1,470
Total HRA Balance 27,453   19,496  
Page 147 of 209

Page 148

Annual Accounts 2021/22
Notes to the Accounts 
- 66 -
27.4. Capital Grants Unapplied Account
The Capital Grants Unapplied Account is used to hold grant received but not yet utilised. 
2020/21 2021/22 
£000 £000   
Opening Balance at 1 April 17,724 12,421   
Capital grants received in the year but unapplied 8,476 5,283
Capital grants received in previous years now applied (13,779) (10,580)   
Closing Balance at 31 March 12,421 7,124   
27.5. Repairs and Renewals Fund
The Repairs and Renewals Fund represents a resource to fund crematorium equipment replacement and
recognises the prepayments for lifecycle replacement costs for PPP schools. 
2020/21 2021/22 
£000 £000   
Opening Balance at 1 April 672 11,651   
Transfers in year (see Note 32) 10,979 2,104   
Closing Balance at 31 March 11,651 13,755
27.6. Capital Fund
The Council operates a Capital Fund where receipts from the sale of assets can be directed and utilised for
financing capital expenditure and loans fund repayments. 
2020/21 2021/22 
£000 £000   
Opening Balance at 1 April 1,154 4,470   
Amounts expended on principal repayments (1,154) (4,470)
Transfer from Capital Receipts Reserve 4,470 396   
Closing Balance at 31 March 4,470 396
27.7. Insurance Fund
The Insurance Fund represents a resource to make provision for outstanding claims and events. 
2020/21 2021/22 
£000 £000   
Opening Balance at 1 April 13,000 13,000   
Amounts expended on premiums and claims settlements (3,309) (3,677)
Contributions to / from Insurance Fund 3,309 3,677   
Closing Balance at 31 March 13,000 13,000
27.8. Capital Receipts Reserve
The Capital Receipts Reserve represents the value of receipts arising from the disposal of non-current assets that
can be used to finance capital investment. 
2020/21 2021/22 
£000 £000   
Opening Balance at 1 April - -   
Capital receipts received in the year 4,494 1,410
Amount applied to finance new capital investment (24) (1,014)
Amount transferred to Capital Fund (4,470) (396)   
Closing Balance at 31 March - -
Page 148 of 209

Page 149

Annual Accounts 2021/22
Notes to the Accounts 
- 67 -
28. Unusable Reserves
The total for Unusable Reserves in the Balance Sheet is made up of the following reserves: 
2020/21 2021/22 
£000 £000   
Revaluation Reserve 646,564 865,726
Capital Adjustment Account 1,300,938 1,319,029
Financial Instruments Adjustment Account (28,494) (26,802)
Pensions Reserve (417,190) (156,156)
Employee Statutory Adjustment Account (22,995) (21,717)
Total Unusable Reserves 1,478,823 1,980,079   
28.1. Merger with CLNL 
Following merger with CLNL, North Lanarkshire Council inherited the following assets and liabilities on the 01 April
2021:-       
£’000
Fixed Assets  1,451
Pension Liability (16,203)
Net Liability (14,752)
28.2. Revaluation Reserve
The Revaluation Reserve contains the gains made by the Authority arising from increases in the value of its
Property, Plant and Equipment. The balance is reduced when assets with accumulated gains are:
• revalued downwards or impaired and the gains are lost
• used in the provision of services and the gains are consumed through depreciation, or
• disposed of and the gains are realised.
The Reserve contains only revaluation gains accumulated since 1 April 2007, the date that the Reserve was
created. Accumulated gains arising before that date are consolidated into the balance on the Capital Adjustment
Account. 
28.3. Capital Adjustment Account
The Capital Adjustment Account absorbs the timing differences arising from the different arrangements for
accounting for the consumption of non-current assets and for financing the acquisition, construction or
enhancement of those assets under statutory provisions. The Account is debited with the cost of acquisition,
construction or enhancement as depreciation, impairment losses and amortisations are charged to the
Comprehensive Income and Expenditure Statement (with reconciling postings from the Revaluation Reserve to
convert fair value figures to a historical cost basis). The Account is credited with the amounts set aside by the
Authority as finance for the costs of acquisition, construction and enhancement. 
The Account also contains revaluation gains accumulated on Property, Plant and Equipment before 1 April 2007,
the date that the Revaluation Reserve was created to hold such gains.   Note 31 provides details of the source of
all the transactions posted to the Account, with the exception of the adjusting amounts written out of the Revaluation
Reserve which are detailed in note 28.1 above. 
2020/21 2021/22  
£000 £000
Opening Balance at 1 April 553,724 646,564   
Upward revaluation of assets  109,813 237,287
Downward revaluation of assets and impairment losses not charged to the Surplus /
Deficit on Provision of Services
(4,806) (4,922)
Surplus / Deficit on revaluation of non-current assets not posted to the
Surplus / Deficit on Provision of Services
105,007 232,365    
Difference between fair value depreciation and historical cost depreciation (9,324) (10,858)
Accumulated gains on assets sold (2,843) (2,345)
Closing Balance at 31 March 646,564 865,726
Page 149 of 209

Page 150

Annual Accounts 2021/22
Notes to the Accounts 
- 68 - 
2020/21  2021/22  
£000 £000
Opening Balance at 1 April 1,299,393 1,300,938
Transfers in of CLNL balances - 1,451
Revised Opening Balance at 1 April 1,299,393 1,302,389
Items relating to capital expenditure debited or credited to the Comprehensive
Income and Expenditure Statement:  
• Charges for depreciation and impairment of non-current assets (107,740) (118,732)
• Net book value of non-current assets written off on disposal or sale (3,119) (644) 
Donated assets 105 929
Adjusting amounts written out of the Revaluation Reserve 12,167 13,203
Net transfer to Capital Grants Unapplied Account 3,647 5,226
Capital financing applied in the year:  
• Use of Capital Receipts Reserve to finance new capital expenditure 24 1,014
• Capital grants and contributions credited to the Comprehensive Income
and Expenditure Statement that have been applied to capital financing
47,195 57,601 
• Statutory provision for the financing of capital investment charged against
the General Fund and HRA balances (Loans Fund repayments)
21,848 23,780
• Capital expenditure charged against the General Fund and HRA balances 27,418 34,262
Closing Balance at 31 March 1,300,938 1,319,029 
28.4. Financial Instruments Adjustment Account
The Financial Instruments Adjustment Account absorbs the timing differences arising from the different
arrangements for accounting for income and expenses relating to certain financial instruments and for bearing
losses or benefiting from gains per statutory provisions. 
2020/21 2021/22 
£000 £000   
Balance at 1 April (30,192) (28,494)   
Premiums / Discounts Annual Write-Off 1,674 1,675
Re-measurement of LOBO loans               24 16   
Balance at 31 March (28,494) (26,803)
28.5. Pensions Reserve
The Pensions Reserve absorbs the timing differences arising from the different arrangements for accounting for
post employment benefits and for funding benefits in accordance with statutory provisions.  The Council accounts
for post employment benefits in relation to the Local Government Pension Scheme in the Comprehensive Income
and Expenditure Statement as the benefits are earned by employees accruing years of service, updating the
liabilities recognised to reflect inflation, changing assumptions and investment returns on any resources set aside
to meet the costs.  
However, statutory arrangements require benefits earned to be financed as the Council makes employer’s
contributions to pensions funds or eventually pays any pensions for which it is directly responsible.  The debit
balance on the Pensions Reserve therefore shows a substantial shortfall between the benefits earned by past and
current employees and the resources the Council has set aside to meet them.  The statutory arrangements will
ensure that funding will have been set aside by the time the benefits come to be paid.  
Page 150 of 209

Page 151

Annual Accounts 2021/22
Notes to the Accounts 
- 69 - 
2020/21 2021/22  
£000 £000
Balance at 1 April (327,745) (417,190)    
Re-measurement of net defined pension liability (52,108) 352,023
Reversal of items relating to retirement benefits debited or credited to the Surplus /
Deficit on the Provision of Services in the Comprehensive Income and Expenditure
Statement
(88,565) (130,115)
Employers’ pensions contributions paid to Strathclyde Pension Fund 51,228 55,329
Effect of Business Combinations and Disposals  - (16,203)
Balance at 31 March (417,190) (156,156)
28.6. Employee Statutory Adjustment Account
The Employee Statutory Adjustment Account absorbs the differences that would otherwise arise on the General
Fund Balance from accruing for compensated absences earned but not taken in the year.  Statutory arrangements
require that the impact on the General Fund Balance is neutralised by transfers to or from the Account. 
2020/21 2021/22  
£000 £000    
Balance at 1 April (17,677) (22,995)    
Settlement or cancellation of accrual made at the end of the preceding year 17,677 22,995
Amounts accrued at the end of the current year (22,995) (21,717)    
Balance at 31 March (22,995) (21,717) 
Page 151 of 209

Page 152

Annual Accounts 2021/22
Notes to the Accounts 
- 70 -
29. Capital Commitments
At 31 March 2022, the Council was contractually committed to the following significant capital works. 
£000    
HRA – New Build Programme 28,440
HRA – Heating 11,303
HRA – Roofing & Render 15,850
HRA – Bathrooms 1,300
HRA – Kitchens 1,000
HRA – Windows and Doors 5,338
HRA – Tower Strategy 6,997
HRA – Lead Pipe 1,048
HRA – Community Care 2,525
HRA – Security & DE Systems 1,390
HRA – Estate Regeneration 300
HRA – Fire Safety 950
HRA – Other 400
School Alterations and Upgrades 3,148
Redevelopment and Office Upgrades 598
Other Projects 338
Schools Modernisation 50,233
Early Years Expansion 711
City Deal 20,487
Regeneration Capital Grant Fund 2,491
PBIP 647
Other Regeneration Projects 1,302
Digital NL 3,635
Road Operations-LED Lighting 2,349
Road Operations-Roads/Bridges 2,521
Garrell Burn Project 1,234
Park Path Widening 113
Active Travel 851
Ventilation 416
Flood Alleviation 87
Biodiversity/Nature Trails 219
Solar Lighting 158 
Page 152 of 209

Page 153

Annual Accounts 2021/22
Notes to the Accounts 
- 71 -
30. Capital Expenditure and Capital Financing
The total amount of capital expenditure incurred in the year is shown in the table below (including the assets
acquired under finance leases and PPP, or similar contracts), together with the resources that have been used to
finance it. Where capital expenditure is to be financed in future years by charges to revenue as assets are used by
the Council, the expenditure results in an increase in the Capital Financing Requirement (CFR), a measure of
capital expenditure incurred historically by the Council that has yet to be financed. The CFR is analysed in the
bottom part of this note. 
2020/21 2021/22  
£000 £000
Net Book Value of Property, Plant & Equipment 2,872,603 2,998,472
Intangible Assets 2,798 8,169
Transfer of Property Plant & Equipment to Held for Sale - -
Capital Adjustment Account  (1,299,393) (1,302,389)
Revaluation Reserve (553,724) (646,563)
Opening capital financing requirement 1,022,284 1,057,689   
Capital investment   
Property, plant and equipment   130,149 165,997
Donated Assets 105 929
Intangible assets 5,388 4,269   
Sources of Finance  
Capital Receipts (24) (1,014)
Government Grants and Other Contributions (50,842) (62,828)
Donated Assets  (105) (929)
Sums set aside from revenue  
Direct revenue contributions  (27,418) (34,262)
Repayment of loans fund advances (21,848) (23,780)
Closing capital financing requirement 1,057,689 1,106,071   
Explanations of movements in year  
Increase in underlying need to borrow 32,813 48,382
Assets acquired under finance leases - -
Assets acquired under PPP contracts 2,592 -
Increase / (decrease) in capital financing requirement 35,405 48,382 
Page 153 of 209

Page 154

Annual Accounts 2021/22
Notes to the Accounts 
- 72 -
31. Adjustments between Accounting Basis and Funding Basis under Regulations
This note details the adjustments that are made to the total comprehensive income and expenditure recognised by
the Authority in the year in accordance with proper accounting practice to the resources that are specified by
statutory provisions as being available to the Authority to meet future capital and revenue expenditure. 
2021/22  Usable Reserves Movement
in
Unusable
Reserves
General
Fund
Housing
Revenue
Account
Capital
Fund
Capital
Receipts
Reserve
Capital
Grants
Unapplied
Account  
£000 £000 £000 £000 £000 £000           
Adjustments primarily involving the Capital
Adjustment Account:      
Reversal of items debited or credited to the
CI&E Statement:      
Charges for depreciation and impairment of
non-current assets
88,382 30,350 - - - (118,665)
Capital grants and contributions applied (44,088) (15,824) - - (5,297) 63,690
Amounts written off as part of gain/loss on
disposal 
644     (644)
Movements in the fair value of Investment
properties
- - - - - -
Statutory provision for the financing of capital
investment
(14,916) (8,864) - - - 23,780
Capital expenditure funded from current
revenue
(1,448) (32,813) - - - 34,261        
Adjustments primarily involving the capital
receipts reserve or capital fund:      
Transfer of capital receipts credited to CIES as
part of gain or loss on disposal
(1,396) (14)  1,410  -
Use of capital receipts to finance new capital
expenditure   
(1,014)  1,014       
Adjustment primarily involving the
Financial Instruments Adjustment Account:      
Movements recognised under statutory
provisions relating to Financial Instruments
(1,001) (690) - - - 1,691        
Adjustments primarily relating to the
Pensions Reserve:      
Reversal of items relating to retirement
benefits charged to the CI&E Statement
120,664 9,451 - - - (130,115)
Employer’s pensions contributions and direct
payments to pensioners payable in the year
(51,310) (4,019) - - - 55,329        
Adjustment primarily involving the
Employee Statutory Adjustment Account:      
Amount by which remuneration charged to the
CI&E on an accruals basis is different from
remuneration chargeable in accordance with
statutory requirements
(1,335) 57 - - - 1,278        
Total Adjustments 94,196 (22,366) - 396 (5,297) (68,380)  
Page 154 of 209

Page 155

Annual Accounts 2021/22
Notes to the Accounts 
- 73 -
2020/21  Usable Reserves Movement
in
Unusable
Reserves
General
Fund
Housing
Revenue
Account
Capital
Fund
Capital
Receipts
Reserve
Capital
Grants
Unapplied
Account  
£000 £000 £000 £000 £000 £000           
Adjustments primarily involving the Capital
Adjustment Account:      
Reversal of items debited or credited to the
CI&E Statement:      
Charges for depreciation and impairment of
non-current assets
78,823 28,917 - - - (107,740)
Capital grants and contributions applied (35,733) (9,911) - - (5,303) 50,947
Amounts written off as part of gain/loss on
disposal 
3,119 - - - - (3,119)
Movements in the fair value of Investment
properties
- - - - - -
Statutory provision for the financing of capital
investment
(13,929) (7,919) - - - 21,848
Capital expenditure funded from current
revenue
(272) (27,146) - - - 27,418        
Adjustments primarily involving the capital
receipts reserve or capital fund:      
Transfer of capital receipts credited to CIES as
part of gain or loss on disposal
(4,470) (24) - 4,494 - -
Use of capital receipts/capital fund to finance
new capital expenditure
- - - (24) - 24       
Adjustment primary involving the Financial
Instruments Adjustment Account:      
Movements recognised under statutory
provisions relating to Financial Instruments
(1,041) (658) - - - 1,699        
Adjustments primarily relating to the
Pensions Reserve:      
Reversal of items relating to retirement
benefits charged to the CI&E Statement
80,837 7,728 - - - (88,565) 
Employer’s pensions contributions and direct
payments to pensioners payable in the year
(46,758) (4,470) - - - 51,228        
Adjustment primarily involving the
Employee Statutory Adjustment Account:      
Amount by which remuneration charged to the
CI&E on an accruals basis is different from
remuneration chargeable in accordance with
statutory requirements
5,053 266 - - - (5,319)        
Total Adjustments 65,629 (13,217) - 4,470 (5,303) (51,579) 
Page 155 of 209

Page 156

Annual Accounts 2021/22
Notes to the Accounts 
- 74 -
32. Transfers to/from Statutory Reserves
This note sets out the amounts set aside from the General Fund statutory reserves to provide financing for future
expenditure plans and the amounts transferred back to meet General Fund expenditure in 2021/22. Figures for
2020/21 are provided in an additional table for comparison purposes: 
2021/22 Transfers to /
(from) General
Fund
Transfers (from) / to Other Statutory Reserves 
HRA Capital
Fund
Repairs &
Renewals
Fund
Insurance
Fund 
Capital
Receipts
Reserve 
£000 £000 £000 £000 £000 £000       
Amounts expended on repairs and renewals
on Council facilities
- - - - - -
Contributions to Repairs & Renewals Fund
from General Fund
(2,104) - - 2,104 - -
Contributions to Insurance Fund  (1,816) (1,860)   3,677 
Amounts expended on premiums and claims
settlements
1,816 1,860   (3,677) 
HRA Contribution to General Fund      
Amounts expended on principal repayments 4,470  (4,470)   
Contribution to Capital Fund   396   (396)       
Total Adjustments                 2,366 - (4,074) 2,104 - (396) 
2020/21 Transfers to /
(from) General
Fund
Transfers (from) / to Other Statutory Reserves 
HRA Capital
Fund
Repairs &
Renewals
Fund
Insurance
Fund 
Capital
Receipts
Reserve 
£000 £000 £000 £000 £000 £000       
Amounts expended on repairs and renewals
on Council facilities
- - - -  -
Contributions to Repairs & Renewals Fund
from General Fund
(10,979) - - 10,979  -
Contributions to Insurance Fund  (1,455) (1,854) - - 3,309 -
Amounts expended on premiums and claims
settlements
1,455 1,854 - - (3,309) -
HRA Contribution to General Fund - - - - - -
Amounts expended on principal repayments 1,154 - (1,154) - - -
Contribution to Capital Fund - - 4,470 - - (4,470)       
Total Adjustments (9,825) - 3,316 10,979 - (4,470) 
Page 156 of 209

Page 157

Annual Accounts 2021/22
Notes to the Accounts 
- 75 -
33. Reconciliation of 2021/22 Comprehensive Income and Expenditure Statement to Cash Flow
Operating Activities 
£000 £000
Surplus / (Deficit) on the Provision of Services  (18,811)   
Non-Cash Transactions  
Items Relating to Loans Fund (426) 
Adjustment relating to Provisions (2,386) 
Adjustment relating to Non Domestic Rates (90) 
Adjustment relating to Capital Items 66,217 
Adjustment relating to Pensions Reserve 74,786 138,101   
Items on an Accruals Basis  
Increase in Inventories (638) 
Decrease in Debtors 13,638 
Increase in Creditors 32,659 45,659   
CLNL Transfer  10,741   
Net Cash Inflow from Operating Activities  175,690
34. Reconciliation of Financing Activities to Balance Sheet 
Balance at 
31 March
2021
Cash Flow Non-Cash Balance at 
31 March
2022     
Cash and Cash Equivalents 110,781 3,445 30 114,256 
110,781 3,445 30 114,256     
Financing Activities:    
Borrowing short-term 263,140 (25,803) 12,761 250,098
Borrowing long-term 490,575 (37,484) (13,158) 439,933
Net Agency Grants (15,423) 15,423 - -
Finance leases short-term 7,258 (7,275) 7,030 7,013
Finance leases long-term 173,905 - (6,960) 166,945 
919,455 (55,139) (327) 863,989     
Total cash outflow from financing activities  (55,139)       
Total cash inflow before financing activities  58,584  
Non-Cash includes the movement in accrued interest due and receivable and the reclassification of borrowing and
leasing liabilities from long-term to short–term (due to be paid in less than 12 months). 
Net Agency Grants represents financing whereby the Council had been asked by Scottish Government to
administer a number of COVID-19 grant schemes on their behalf to a wide range of recipients, with the amount
shown representing the balance due to be reimbursed to the Council for payments made in advance of receipt of
external funding.   
35. External Audit Costs
North Lanarkshire Council incurred the following fees relating to external audit inspection: 
2020/21 2021/22 
£000 £000   
Agreed fee for the year 530 541
Total 530 541   
The external audit costs include a fee of £4,186 (£4,100 2020/21) in relation to the audit of the Council’s
Charitable Trusts.  
Page 157 of 209

Page 158

Annual Accounts 2021/22
Notes to the Accounts 
- 76 -
36. Statutory Trading Operations
Trading Operations were established following the introduction of the Local Government in Scotland Act 2003 which
requires each significant trading operation to break even on a three year rolling programme. The Council’s Trading
Operation is required to operate in a commercial environment and balance their budget by generating income from
fees and charges to other organisations.
The net deficit arising from the ordinary operation of the Trading Operation in 2021/22 is £0.076m. The financial
results for the last three years of the Trading Operation can be summarised as follows: 
Turnover Expenditure (Surplus)/
Deficit   
£000 £000 £000  
Trading Operation  2019/20
2020/21
2021/22 
(4,802)
(3,572)
(2,938) 
4,472
3,447
3,014 
(330) 
(125)
76 
(Surplus) / Deficit over 3 years (11,312) 10,932 (380)
The activities, customers and operational objectives of the above Statutory Trading Operation are listed below:
The Building Cleaning Trading operation provides a comprehensive cleaning service to external businesses and
service partners across approximately 49 building locations, with an overall staffing complement of 234 staff (68.24
FTE).  Some of these locations also receive a janitor/cleaning service.  The operation deliver cleaning services on
behalf of Engie to schools in the Education 2010 project.  
The Waste Solutions Trading Operation provides refuse collection and disposal services for approximately 1600
traders.  The service is provided by 10 staff (10 FTE). 
Each trader is offered a multiple of collection frequencies and types. We are working towards the full implementation
of the requirements of the Waste (Scotland) Regulations, 2012, and multiple services are now being offered to
commercial organisations to ensure they operate within the terms of the legislation.
A full seven day suite of services is also possible, and the service provides advice on waste reduction and reuse,
as a first response rather than recycling.
The TCA Trading operation provides CCTV and Alarm monitoring to 6 external clients covering the geographical
areas of North Lanarkshire and beyond. The services are provided to Retail Parks, Shopping Centres, Town
Centres, Business Centres, Industrial Units and Yards. The function is carried out within the Community Safety
Team with a management fee levied to the Trading Activity for the cost incurred.
Each element of the Trading Operation is also fully accredited by Investors in People and have successfully retained
the relevant accreditations.
37. Related Parties
The Council is required to disclose material transactions with related parties – bodies or individuals that have the
potential to control or influence the Council or to be controlled or influenced by the Council. Disclosure of these
transactions allows readers to assess the extent to which the Council might have been constrained in its ability to
operate independently or might have secured the ability to limit another party’s ability to bargain freely with the
Council.  Related party transactions have been undertaken at arm's length.
Central and Scottish Government
Central government has effective control over the general operations of the Council providing the statutory
framework within which the Council operates as well as providing the majority of funding in the form of grants.
Details of government grants received can be found in Note 11.
Joint Boards
The Council is represented on a number of joint boards which are ‘Section 106’ independent public bodies formed
by Act of Parliament. These bodies are Strathclyde Partnership for Transport, Strathclyde Concessionary Travel
Scheme and Lanarkshire Valuation Joint Board. All local government functions that relate to these bodies have
been delegated from the constituent Councils that comprise the area of each Board. The members of each Board
are elected Councillors and appointed by the Councils in proportions specified in the legislation.
The Council has no shares, nor ownership of any of these Boards. Nevertheless, these Boards are included within
the Council's Group Accounts under the wider definition of an "associate" as the Council is represented on the
Board and participate in policy-making processes.
Page 158 of 209

Page 159

Annual Accounts 2021/22
Notes to the Accounts 
- 77 -
The Council's share of each Board's net assets is calculated on its respective percentage share of the aggregate
contributions made by the constituent Councils.
Local government legislation provides that local authorities have an obligation to meet the expenditure of the Joint
Boards of which they are a constituent member. As a consequence, the added liabilities from the pension deficits
are fully incorporated within the Group Accounts. 
Funding provided is as follows: 
2020/21 2021/22 
£000 £000   
Strathclyde Partnership for Transport 5,411 5,453
Strathclyde Concessionary Travel Scheme 568 572
Lanarkshire Valuation Joint Board 2,195 2,106 
Companies Controlled or Significantly Influenced by the Council
The Council has entered into a number of transactions under joint venture, subsidiary, associate and other external
trading arrangements. 
2020/21  2021/22 
Income Expenditure Income Expenditure 
£000 £000 £000 £000     
Amey Public Services LLP 260 14,087 641 18,141
Culture and Leisure NL Ltd 2,683 27,289 - -
Fusion Assets Ltd 111                  809 172                  821
Mears Scotland LLP 102 39,878 1,971 52,898
North Lanarkshire Integration Joint Board 136,461 148,430 149,586 164,787
North Lanarkshire Municipal Bank Ltd 144 200 144 181
NL Properties
Routes to Work
952
25
1,626
2,244
1,015
13
533
3,605
The Campsies Centre (Cumbernauld) Ltd 77 - - -     
Outstanding balances for each of these entities are as follows: 
2020/21 2021/22 
Debtor Creditor Debtor Creditor 
£000 £000 £000 £000     
Amey Public Services LLP 116 660 410 1,965
Culture and Leisure NL Ltd 913 64 - -
Fusion Assets 34 132 47 740
Mears Scotland LLP                    13 (11)               1,424 177
North Lanarkshire Integration Joint Board - 16,718 - 31,919
North Lanarkshire Municipal Bank Ltd
NL Properties
-
1,727
-
1,143
-
2,228
-
267
Routes to Work 21 - 8 3
The Campsies Centre (Cumbernauld) Ltd 87 - - -     
The Council’s financial statements show no debtor or creditor balances for North Lanarkshire Municipal Bank Ltd.
However, at the 31 March 2022 the Council’s short-term borrowing included £19.067m (£21.871m in 2020/21) of
Municipal Bank deposits which are invested in the Council. 
Page 159 of 209

Page 160

Annual Accounts 2021/22
Notes to the Accounts 
- 78 -
The Council is also represented on the Boards of various companies detailed below that have no share capital. 
Company Name Status Function   
Environmental Key Fund Limited by guarantee 
(financial risk not material to Council) 
Provide grants to community organisations
undertaking environmental projects.  
Scotland Excel Joint committee formed under Local
Govt Act 1973
Not-for-profit procurement organisation serving
Local Authorities and related organisations
across Scotland. 
Glasgow and the Clyde Valley
Strategic Development
Planning Authority 
Joint committee formed under Local
Govt Act 1973
Partnership of 8 local authorities working
together on strategic development planning
matters.
Glasgow and the Clyde Valley
City Deal Cabinet 
Joint committee formed under Local
Govt Act 1973
Partnership of 8 local authorities oversee the
delivery of the City Deal programme.
West of Scotland Loan Fund Limited by guarantee 
(financial risk not material to Council)
Partnership of authorities from within the
former Strathclyde Regional Council area and
was formed to encourage the creation and
growth of small businesses within local Council
areas. 
Dunbartonshire Educational
Trust Scheme 1962
Registered charity Charitable trust providing grants for
further/higher education for those who live in
the old county area of Dumbarton. 
SEEMIS Group Plc Limited liability partnership Provides education management information
software to local authorities across Scotland. 
Stirlingshire Educational Trust Registered charity Charitable trust providing grants for education
for those who live in the old county area of
Stirling. 
Business Loans Scotland Limited by guarantee 
(financial risk not material to Council)
Provides pan-Scotland loan funding to
businesses. 
Continuing Education
Gateway/ Gateway Shared
Services
Consortium of local authorities Gateway Shared Services is a consortium of
10 Local Authorities in the West of Scotland to
further the provision of careers and
educational guidance services. 
West of Scotland European
Forum
Joint committee formed under Local
Govt Act 1973
Develops positive links between the
communities of the region and the institutions
of the European Union. 
Page 160 of 209

Page 161

Annual Accounts 2021/22
Housing Revenue Account
- 79 -
The HRA reflects the statutory requirement to account separately for local authority housing provision, as defined
in the Housing (Scotland) Act 1987. The Income and Expenditure Statement reports the net cost for the year and
shows how these costs were funded from rents and other income. 
Income and Expenditure Statement
2020/21    2021/22 2021/22
£000  £000 £000
143,586 Dwelling Rent Income     136,319 
1,077
-
Non-Dwelling Rent Income
Departmental Recharges 
1,101       
3,328 
1,676 Other Income        1,031 
146,339 Total Income  141,779
45,569 Repairs and Maintenance 53,697 
40,589 Supervision and Management 38,013 
28,264 Depreciation  29,427 
653 Revaluations 922 
- Other Expenditure 8,348 
115,075 Total Expenditure  130,407
(31,264) Net (Surplus)/Deficit of HRA Services per Income and Expenditure
Account 
(9,583)
404 HRA Service Share of Corporate and Democratic Core 404 
(413)  HRA Share of other amounts included in the whole authority Net Cost
of Services but not specifically allocated to specific services              
677 
(31,273) Net (Surplus)/Deficit of HRA Services  (8,502)
(24) Gains or Losses on disposal of non-current asset (14) 
9,191 Interest Payable (Including Amortisation of Premiums) 8,194 
(161)
4,932
Interest and Investment Income
Impairment of Financial Assets
(14)
2,275 
722 Net Interest on the Net Defined Benefit Liability/Asset (524) 
(9,911) Recognition of Capital Grant (15,824) 
(26,524) (Surplus)/Deficit for the year on HRA Services  (14,409)
1.1. Statement of Movement on the Housing Revenue Account Balance
2020/21   2021/22 2021/22
£000  £000 £000
(14,146) Balance on the HRA at the end of the previous year  (27,453)
(26,524) 
13,217 
(13,307)
(Surplus) / Deficit for the year on the HRA Income and Expenditure
Statement
Adjustments between accounting basis and funding basis under
regulations (see Note 31)
Transfer (to) and from other statutory reserves (see Note 32)
(14,409) 
22,366 
- 7,957
(27,453) Balance on the HRA at the end of the current year  (19,496)
1.2. Housing Stock
The Council’s housing stock at 31 March 2022 was 36,961 (36,792 at 31 March 2021) in the following categories:
House Numbers
2020/21
Property Types House Numbers 
2021/22
305 1 Apartment 305
6,687 2 Apartment 6,697
18,935 3 Apartment 19,030
9,811 4 Apartment 9,865
1,022 5 Apartment 1,031
32 Other 33
36,792 Total 36,961
1.3. Rent Arrears
Current rent arrears outstanding as at 31 March 2022 amounted to £5.656m. This represented 4.26% of rents paid
during the year (the comparative figures for the 2020/21 year were £5.049m and 3.52% respectively).
1.4. Impairment of Financial Assets
The expected credit losses at 31 March 2022 amounted to £6.992m (£8.778m as at 31 March 2021).
1.5. Void Rents
The level of income lost from unlet Council Dwellings during 2021/22 amounted to £1.343m (2020/21 £0.965m).
Page 161 of 209

Page 162

Annual Accounts 2021/22
Council Tax Income Statement 
- 80 -
The Council Tax Income Statement shows the gross income raised from Council Taxes levied and deductions
made under Statute. The resultant net income is transferred to the Comprehensive Income and Expenditure
Statement. 
2020/21 2021/22 
£000 £000
Gross Council Tax levied and contributions in lieu 176,528 177,994
Adjustments for prior years Council Tax (2,120) (2,071)   
Adjusted for:  
Council Tax Benefits (Net of Government Grants)
Council Tax Reduction Scheme
-
(25,444)
-
(23,989)
Other discounts and reductions (21,024) (21,410)
Provision for Non-collection (5,450) (5,324)   
Net Council Tax Income per the Comprehensive Income and
Expenditure Account
122,490 125,200
1. Nature of the Council Tax Charge
The charge for each household is based upon the valuation banding to which the dwelling is allocated by the
Assessor. Each dwelling in the Council area is placed into one of 8 valuation bands (A to H). The charge per Council
Tax Band is calculated as a proportion of Band D, with lower valued properties paying less, and higher valued
properties paying more. These proportions are determined by the Local Government Finance Act 1992.
The Council Tax bill is reduced by 25% where a dwelling has only one occupant or by 10% for long-term empty
properties and second homes, and under certain circumstances a 50% reduction can be awarded. Properties that
have been empty for one year and over may be subject to a 100% levy. The property bandings are adjusted where
the property is occupied by disabled persons and total exemptions are available for certain categories of occupants.
No prompt payment discounts are offered on any properties.
Charges in respect of water and waste water are the responsibility of Scottish Water. The Council collects total
monies and makes a precept payment to the Water Authority.
2. The Calculation of the Council Tax Base
The Valuation Bands for the Council Tax can be analysed as follows: 
No. of
Dwellings
No. of
Exemptions
Disabled
Relief
Discounts
25%
Discounts
50%
Total Dwellings Ratio to Band D Band D
Equivalent
Band A 53,039 2,767 (38) 7,127 518 42,665 0.6666 28,441
Band B 37,840 935 6 4,220 309 32,370 0.7777 25,173
Band C 19,881 412 25 2,004 124 17,316        0.8888 15,390
Band D 17,713 202 (47) 1,320 70 16,168 1.0000 16,168
Band E 17,157 113 39 825 64 16,116 1.3139 21,175
Band F 10,070 48 80 320 35 9,587 1.6250 15,579
Band G 3,088 16 44 93 8 2,927 1.9583 5,732
Band H 162 3 1 4 0 154 2.4500 377     
Total 128,035     
Provision for non-collection 4,161     
Council Tax Base 123,874 
3. The Council Tax Charge
The charge for each band for 2021/22 was as follows: 
£ per Dwelling
Band A 814.17
Band B 949.86
Band C 1,085.56
Band D 1,221.25
Band E 1,604.59
Band F 1,984.53
Band G 2,391.61
Band H 2,992.06 
Page 162 of 209

Page 163

Annual Accounts 2021/22
Non Domestic Rates Income Statement 
- 81 -
The Non-Domestic Rates Income Statement is an agent’s statement that reflects the statutory obligation for billing
authorities to maintain a separate Non-Domestic Rate Account. The statement shows the gross income from the
rates and deductions made under statute. The net income is paid to the Scottish Government as a contribution to
the national non-domestic rate pool, where it is pooled nationally, and re-distributed back to local authorities. 
2020/21 2021/22 
£000 £000   
Gross rates levied and contributions in lieu 145,451 144,880   
Less:  
Reliefs and other deductions (64,883) (46,536)
Payments of interest - -
Provision of bad and doubtful debts (2,417) (2,950)
Net Non Domestic Rate Income 78,151 95,394   
Adjustment to previous years’ NNDR (3,774) (2,761)
Contribution to Non Domestic Rates 74,377 92,634   
Distribution from Non Domestic Rate Pool 71,360 84,339
Adjustment for the years prior to the introduction of the pool - -   
Income credited to the Comprehensive Income and
Expenditure Statement
71,360 84,339 
1. Net Rateable Value Calculation                        
National Non Domestic Rates is a property based tax. It is based on the rateable value of a non-domestic (business)
property, multiplied by a poundage set nationally by Scottish Ministers, less any relief to which a ratepayer may be
eligible. 
The poundage rate for 2021/22 is 49p for properties with a rateable value not greater than £51,000. The
Intermediate Property Rate of 50.3p (1.3p supplement on the poundage) applies for properties with a rateable value
between £51,001 and £95,000, and the Higher Property Rate of 51.6p (2.6p supplement on the poundage) is
payable on properties with a rateable value greater than £95,000.  There are numerous relief packages available
aimed at responding directly to the immediate challenges posed to the commercial property market by the COVID-
19 pandemic along with the need to promote green recovery and net zero emissions.  These include Fresh Start
Relief, Business Growth Accelerator, 100% Day Nursery Relief for standalone nurseries, as well as maintaining
prior initiatives such as Small Business Bonus Scheme, Empty Property Relief, Disabled Rates Relief.  In addition,
100% relief for retail, hospitality, and leisure (RHL) and aviation sectors is made available subject to eligibility.
Analysis of Rateable Values as at 1 April 2021. 
Number of Subjects Rateable Value  
£000
Industrial and Freight 3,075 98,406   
Commercial Subjects   
Shops (inc. Restaurants) 2,586 64,078 
Offices 2,189 35,467 
Hotels, Boarding Houses etc. 33 3,179 
Others 1,193 25,518   
Miscellaneous and Formula Valued Subjects 1,250 60,774   
Total  10,326 287,422 
Page 163 of 209

Page 164

Annual Accounts 2021/22
Sundry Accounts Statement 
- 82 -
The Council administers 31 Educational and 24 Sundry Trusts and Endowments as trustees. These trust funds do
not represent assets available to the Council and as such have been excluded from the Balance Sheet of the
Council. The summary of the balances held on these Trusts is detailed below. 
There is one Charitable Trust remaining, which the Council aims to transfer to an Office of the Scottish Charity
Regulator (OSCR) agreed beneficiary charity. The timescale for transfer is dependent on identifying a suitable
beneficiary and subsequent approval by OSCR.
The principal Funds are the Lanarkshire Education Trust at £0.177m and the Marshall (Education) Trust at £0.540m,
which were established under the Education Endowments (Scotland) Acts 1928 to 1935 to provide opportunities
for educational advancement. These Funds are administered by a joint committee with South Lanarkshire Council
and the individual funds are subject to separate audit arrangements. However, they have been considered in overall
terms in the context of those materiality levels which apply to the Council's Financial Statements. 
The market value of all of the Educational Trusts Investments as at 31 March 2022 was £1.077m (£1.007m at 31
March 2021) and is shown at book value on the balance sheet £0.032m (£0.032m 2020/21).
Summary Income and Expenditure Account 
2020/21 2021/22 
£000 £000
Education Trust Funds:   
Income   
Interest on Investments, etc. 13 18     
Expenditure   
Grants, Prizes, Awards, etc. (20) (19)     
Surplus / (Deficit) for the year (7) (1)   
Other Sundry Trust Funds:   
Income   
Interest on Investments - -     
Expenditure   
Grants, Prizes, Awards, etc. - -     
Surplus / (Deficit) for the year - -
Balance Sheet at 31 March 2022
2020/21  2021/22 2021/22
£000  £000 £000 
Investments  
32  Education Trust Funds 32 
1  Sundry Trust Funds 1 
33   33    
733 Advances to Council Loans Fund  730    
71 Current Assets  74    
837 Net Assets  837     
Education Trust Funds  
32  Capital 32 
732  Revenue 731 
764   763     
Sundry Trust Funds  
0  Capital 1 
73  Revenue 73 
73   74    
837 Total Reserves  837     
Page 164 of 209

Page 165

Annual Accounts 2021/22
Group Comprehensive Income and Expenditure Statement 
83
This statement shows the accounting cost in the year of providing Council and subsidiary services and its share
of the results of associates and joint ventures in accordance with International Financial Reporting Standards,
rather than the amount to be funded from taxation. Local authorities raise taxation to cover expenditure in
accordance with regulations, and this is different from the accounting cost.  The taxation position is shown in the
Movement in Reserves Statement. 
2020/21
Restated  
2021/22
Gross
Expenditure
Gross
Income
Net
Expenditure 
Gross
Expenditure
Gross
Income
Net Expenditure
£000 £000 £000  £000 £000 £000       
419,263 (75,095) 344,168 Education & Families 493,514 (75,706) 417,808
234,518 (30,468) 204,050 Enterprise & Communities 285,692 (64,589) 221,103
3,245 (3,245) 0 Trading Operations 2,614 (2,614) -
158,566 (96,225) 62,341 Chief Executives & Other Corporate Services 158,219 (92,224) 65,995
151,848 - 151,848 Adult Health & Social Care (Non-Integrated) 167,499 - 167,499
214,737 (206,716) 8,021 Adult Health & Social Care (Integrated) 227,804 (213,395) 14,409
115,075 (146,339) (31,264) Housing Revenue Account 120,588 (130,171) (9,583)
(3,120) (33) (3,153) Non Service-Specific Costs  (2,198) (11,938) (14,136)
11,036 (6,206) 4,830 Subsidiaries (5,520) (5,118) (10,638)
1,305,169 (564,327) 740,842 Net Cost of Services 1,448,212 (595,755) 852,457       
- (1,375) (1,375) Other Operating Expenditure   - (767) (767)
99,763 (56,011) 43,752 Financing and Investment Income and
Expenditure 
100,627 (51,389) 49,239
78 (869,506) (869,428) Taxation and Non-specific Grant Income 131 (891,091) (890,960)  
(86,209) (Surplus) or Deficit on the Provision of
Services  
9,969       
(19,938) Associates and Joint Ventures accounted for
on an Equity Basis  
(34,171)  
(106,147) Group (Surplus) or Deficit   (24,203)       
Items that will not be reclassified to the
(Surplus) or Deficit on the Provision of
Services   
(105,007) (Surplus) or deficit on the revaluation of non
current assets 
(232,365)  
56,389 Actuarial (gains) or losses on pension assets
and liabilities  
(352,655)  
(617) Share of Other Comprehensive Income and
Expenditure of Associates and Joint Ventures  
(7,283)  
(49,235) Other Comprehensive Income and
Expenditure  
(592,303)       
(155,382) Total Comprehensive Income and
Expenditure  
(616,506)       
Page 165 of 209

Page 166

Annual Accounts 2021/22
Group Balance Sheet 
84
The Balance Sheet is a snapshot of the value at the reporting date of the assets and liabilities recognised by the
Council, its subsidiaries and its share of the net assets or liabilities of its associates and joint ventures. The net
assets of the Council (assets less liabilities) are matched by the reserves held by the Council and its subsidiaries.
The net investment in associates and joint ventures is matched by its share of the reserves of the associates (i.e.
Group Reserves).
31 March 2021
Restated  
31 March 2022
£000   £000 £000 
Property, Plant and Equipment   
1,102,141  Council Dwellings  1,291,802 
1,504,711  Other Land and Buildings  1,568,839 
48,617  Vehicles, Plant and Equipment  46,689 
261,004  Infrastructure Assets  262,561 
12,360  Community Assets  15,854 
22,252  Surplus Assets  22,184 
46,668  Assets Under Construction  70,780 3,278,709 
Intangible Assets   
123  Software Licences  99 
1,544
6,502 
Software/Solution Development
Intangibles Under Development 
2,981
9,038  12,118
70,730 Investment Property   69,796
94,637
2,179
1,384
Investments in Associates and Joint Ventures   135,581
Long-Term Investments
Long-Term Debtors  
2,160
1,423
3,174,852 Long-Term Assets   3,499,787     
88 Short-Term Investments  89 
- Assets Held for Sale  - 
5,153 Inventories   5,413 
114,949 Short-Term Debtors (net of impairment)  85,668 
133,806 Cash and Cash Equivalents  125,920 
253,996 Current Assets   217,090     
(264,398) Short-Term Borrowing  (250,098) 
(163,613) Short-Term Creditors   (194,623) 
(13,353) Short-Term Provisions  (12,665) 
(7,258)
(2,957)
Short-Term Finance Lease Liabilities
Revenue Grant Receipts in Advance                                         
(7,013)
(1,403) 
(451,579) Current Liabilities   (465,802)     
(525,690) Long-Term Borrowing  (473,619) 
(509) Liabilities in Associates and Joint Ventures  (55) 
(173,905) Other Long-Term Liabilities (Finance Leases)  (166,944) 
(433,842) Other Long-Term Liabilities (Pensions)  (156,091) 
- Long-Term Provisions  - 
(1,133,946) Long-Term Liabilities   (796,709)     
1,843,323 Net Assets   2,454,366      
Usable Reserves   
162,180  General Fund Reserve  236,264 
27,453  Housing Revenue Account Balance  19,496 
4,470  Capital Fund   396 
12,421  Capital Grants Unapplied Accounts  7,124 
13,000  Insurance Fund  13,000 
11,651  Repairs and Renewals Fund  13,755 
231,175 Total Usable Reserves   290,035
1,478,823 Unusable Reserves   1,980,079
133,324 Group Reserves   184,252
1,843,323 Total Reserves   2,454,366     
The unaudited accounts were issued on 30 June 2022 and the audited accounts were authorised for issue on the
27 October 2022. 
Elaine Kemp, CPFA
Head of Financial Solutions
Page 166 of 209

Page 167

Annual Accounts 2021/22
Movement in Group Reserves Statement 
- 85 -
This statement shows the movement in the year on the different reserves held by the Council and its subsidiaries
plus its share of the reserves of associates and joint ventures. The Council’s reserves are analysed into Usable
Reserves (i.e. those that can be applied to fund expenditure or reduce local taxation) and other reserves. The
Council’s share of the reserves of associates and joint ventures is an unusable reserve and cannot be used to
fund expenditure or reduce taxation. 
Year Ended 31 March 2022  Usable Reserves Unusable
Reserves
Total
Reserves
of the
Council
Council
Subsidiaries
Council’s
Share of
Reserves
of
Associates
and Joint
Ventures
Total
Reserves 
General
Fund
Housing
Revenue
Account
Other
Statutory
Reserves 
£000 £000 £000 £000 £000 £000 £000 £000
Restated         
Balance at 31 March 2021
Transfer in of CLNL opening
balance 
162,181
10,741 
27,453
-
41,542
-
1,478,823
(14,572) 
1,709,999
(4,011) 
39,197
-
94,127
-
1,843,323
(4,011) 
Revised Restated Balance
as at 31 March 2021 
17,922 27,453 41,542 1,464,071 1,705,988 39,197 94,127 1,839,312
Movement in Reserves
during 2021/22        
Surplus / (Deficit) on
Provision of Services (33,220) 14,409 - - (18,811) 8,843 34,171 24,203
Other Comprehensive
Income and Expenditure - - - 584,388 584,388 632 7,282 592,302
Total Comprehensive
Income and Expenditure (33,220) 14,409 - 584,388 565,577 9,475 41,453 616,505         
Adjustment to useable
reserves permitted by
Accounting Standards
(10,654)  (203)   10,857  -  -  -  - 
Adjustments between
Accounting Basis and
Funding Basis under
Regulations 
Depreciation/Amortisation/
Impairment
94,196 
10,654 
(22,366) 
203 
(4,901) 
-
(68,380) 
(10,857) 
(1,451) 
-
-
-
-
-
(1,451) 
-
Net Increase or Decrease
before Transfers to Other
Statutory Reserves
60,976 (7,957) (4,901) 516,008 564,127 9,475 41,453 615,054         
Transfers to and from Other
Statutory Reserves  2,366 - (2,366) - - - - -         
Increase or Decrease in the
Year 74,083 (7,957) (7,267) 516,008 564,127 9,475 41,453 615,054         
Balance at 31 March 2022
Carried Forward 236,229 19,496 34,275 1,980,079 2,270,114 48,672 135,580 2,454,366         
Page 167 of 209

Page 168

Annual Accounts 2021/22
Movement in Group Reserves Statement 
- 86 - 
Year Ended 31 March 2021 Usable Reserves Unusable
Reserves
Total
Reserves
of the
Council
Council
Subsidiaries
Council’s
Share of
Reserves
of
Associates
and Joint
Ventures
Total
Reserves Restated General
Fund
Housing
Revenue
Account
Other
Statutory
Reserves 
£000 £000 £000 £000 £000 £000 £000 £000         
Balance at 31 March 2020 48,401 14,146 32,550 1,477,503 1,572,600 41,768 73,572 1,687,940         
Movement in Reserves
during 2020/21        
Surplus / (Deficit) on
Provision of Services 57,976 26,524 - - 84,500 1,710 19,938 106,148
Other Comprehensive
Income and Expenditure - - - 52,899 52,899 (4,281) 617 49,235
Total Comprehensive
Income and Expenditure 57,976 26,524 - 52,899 137,399 (2,571) 20,555 155,383         
Adjustments between
Accounting Basis and
Funding Basis under
Regulations 
65,629 (13,217) (833) (51,579) - - - -         
Net Increase or Decrease
before Transfers to Other
Statutory Reserves
123,606 13,307 (833) 1,320 137,399 (2,571) 20,555 155,383         
Transfers to and from Other
Statutory Reserves  (9,825) - 9,825 - - - - -         
Increase or Decrease in the
Year 113,780 13,307 8,992 1,320 137,399 (2,571) 20,555 155,383         
Balance at 31 March 2021
Carried Forward 162,181 27,453 41,542 1,478,823 1,709,999 39,197 94,127 1,843,323         
Page 168 of 209

Page 169

Annual Accounts 2021/22
Group Cash Flow Statement
87 
The Group Cash Flow Statement shows the changes in cash and cash equivalents of the Council and its
subsidiaries during the reporting period. 
2020/21  2021/22 2021/22 
£000  £000 £000    
180,922 Net Cash Inflow / (Outflow) from Operating Activities  163,444     
INVESTING ACTIVITIES   
Cash Inflows:  
3,748 Sale of non-current assets 2,638 
40,675 Capital grants received 50,385 
2,487 Other capital receipts 5,847 
465 Investments redeemed                                                                                      17    
47,375   58,887     
Cash Outflows:  
(138,484)
-
-
Purchase of non-current assets
Long-term investment
Investment in subsidiary 
(175,059)
-
-
(91,109) Net Cash Inflow / (Outflow) from Investing Activities  (116,172)     
FINANCING ACTIVITIES   
Cash Inflows:  
271,000 New loans raised 176,000 
- Net Agency Grants 15,423 
271,000   191,423     
Cash Outflows:  
(284,319) Repayments of amounts borrowed (239,287) 
- Donation (53) 
(7,013)
(15,423)
Capital payments of finance leases
Net Agency Grants
(7,275)
-
(306,755)   (246,615)    
(35,755) Net Cash Inflow / (Outflow) from Financing Activities  (55,192)    
54,058 Net Increase / (Decrease) in cash and cash equivalents  (7,921)    
79,773 Cash and Cash Equivalents at the beginning of the year  133,806
54,058 Net Increase / (Decrease) in cash and cash equivalents  (7,921)
(25) Increase / (Decrease) Non-cash in cash equivalents  35
133,806 Cash and Cash Equivalents at the end of the year  125,920
Group Comprehensive Income and Expenditure Statement to Cash Flow Operating Activities
The following table reconciles the surplus/(deficit) on provision of services in the Group Comprehensive Income
and Expenditure Statement to the Net Outflow from Operative Activities in the Group Cash Flow Statement
above. 
£000 £000   
Surplus/(Deficit) on the Provision of Services  (9.969)   
Non-Cash Transactions     
Items Relating to Loans Fund (426) 
Adjustment relating to Provisions (17,107) 
Adjustment relating to Capital items 66,328 
Adjustment relating to National Non-Domestic Rates (90) 
Adjustment relating to Pension Reserve 74,786 123,491   
Items on an Accruals Basis  
Increase in Inventories (318) 
Decrease in Debtors 15,409 
Increase in Creditors 24,090 39,181 
CLNL Transfer    10,741
Net Cash Inflow from Operating Activities  163,444 
Page 169 of 209

Page 170

Annual Accounts 2021/22
Notes to the Group Accounts 
- 88 -
1.    Disclosure of Interest in Other Entities       
The Code of Practice on Local Authority Accounting requires local authorities to consider their interests in all types
of entities including private companies and joint ventures. The Group Accounts are the financial statements of the
Council and its subsidiaries, plus the investments in associates and interests in joint ventures presented as a
single economic entity.       
The Council has adopted a materiality threshold of £250,000 in considering the basis of incorporation of these
entities within the Group Accounting Statements. 
2. Group Structure
The Council has interests in subsidiaries, associates and joint ventures. The table below explains the relationship
each class of entity has with the Council: 
Relationship with the Council 
Subsidiary Companies: Entity controlled by the Council. Council has 100% interest in its subsidiaries. 
Associate Companies: Entity over which the Council has significant influence. North Lanarkshire Council has
significant influence over the financial and operating policies of its associates but has no shares or ownership of
any of these organisations which are entirely independent of the Council under law and taxation. 
Joint Ventures: Joint arrangements whereby the parties that have joint control of the arrangement have rights to
the net assets of the arrangement. North Lanarkshire Council owns a share in each of its joint venture companies.
The diagram overleaf illustrates the Council’s group structure: 
Page 170 of 209

Page 171

Annual Accounts 2021/22
Notes to the Group Accounts 
- 89 -         
As illustrated in the diagram, North Lanarkshire Municipal Bank Limited is not consolidated within the Group
Accounts. For transparency, the following disclosures are made:
North Lanarkshire Council
Subsidiary Companies
Regeneration
 Fusion Assets Limited
 North Lanarkshire
Properties LLP 
Banking Services
 North Lanarkshire
Municipal Bank
Limited 
Joint Ventures
Road and Lighting
Maintenance
 Amey Public Services LLP
Housing and Property
Maintenance
 Mears Scotland LLP
Associate Companies
 Strathclyde Concessionary
Travel Joint Board
 Strathclyde Partnership for
Transport 
Electoral and Local Taxation
Register
 Lanarkshire Valuation Joint Board 
Employment Support
 Routes to Work Limited 
Consolidated into the Group
Accounts on an equity basis
(33% share) 
Consolidated into the
Group Accounts on line
by line basis (100%)
Consolidated into the Group
Accounts by equity method
under wider definition of
associate. Council holds less
than 20% of voting rights that
is normally presumed to
confer significant influence
but consolidated as Council
has representation on the
board and thus participate in
the policy-making process.
Consolidated into the Group
Accounts by equity method as
Council has significant influence
over the companies by having over
20% of voting rights in each entity.
Not consolidated
into the Group
Accounts as no
financial benefit
accrues to the
Council and it is not
exposed to any
financial liabilities as
a result of its interest
in the Bank 
Health and Social Care
 North Lanarkshire
Integration Joint Board
Consolidated into the
Group Accounts on an
equity basis (50% share) 
 Dunbartonshire Educational
Trust Scheme 1962 
Not consolidated into
the Group Accounts on
the grounds of
materiality – below
£0.250m (28% of
voting rights) 
Page 171 of 209

Page 172

Annual Accounts 2021/22
Notes to the Group Accounts 
- 90 -
The Directors of the Bank are all Elected Members of North Lanarkshire Council. At 31 March 2022, there were
4,462 accounts held within the Bank, with a total of £19.041m on deposit. The Bank has total assets of £19.067m
all of which was invested with North Lanarkshire Council.
3. Combining Entities         
As detailed in the diagram above, the Council has an interest in a number of subsidiary and associate companies
along with joint ventures. The accounting period for most entities is 31 March 2022 with the only exceptions being
in respect of Amey Public Services LLP and Mears Scotland LLP which report to 31 December 2021. The reason
for this variation in reporting period is due to these companies aligning their own accounting periods with the
annual contractual period with the Council. 
4. Changes to Group Structure
During 2021-22 the group structure has now changed to remove the now dissolved Campsies Centre
Cumbernauld Ltd, and Culture and Leisure NL Limited which is in the process of being dissolved. Culture and
Leisure NL Limited operations are incorporated within North Lanarkshire Council accounts.  
5. Principal Place of Business
The principal place of business for each group entity is detailed in the table below. The United Kingdom is the
country of incorporation for all entities.
Fusion Assets Ltd Chapel Street, Airdrie, ML6 6GX
North Lanarkshire Properties LLP Civic Centre, Windmillhill Street, Motherwell, ML1 1AB
Amey Public Services LLP The Sherard Building, Edmund Hally Road, Oxford, OX4 4DQ
Mears Scotland LLP Ellismuir Way, Tannochside Business Park, Uddingston, G71 5PW
Strathclyde Concessionary Travel Scheme
Joint Board 131 St Vincent Street, Glasgow, G2 5JF
Strathclyde Partnership for Transport 131 St Vincent Street, Glasgow, G2 5JF
Lanarkshire Valuation Joint Board North Stand, Cadzow Avenue, Hamilton, ML3 0LU
Routes to Work Limited 168/170 Main Street, Bellshill, Lanarkshire, ML4 1AE
North Lanarkshire Integration Joint Board Kirklands Hospital, Fallside Road, Bothwell, Lanarkshire, G71 8BB 
Page 172 of 209

Page 173

Annual Accounts 2021/22
Notes to the Group Accounts 
- 91 -
6.   Reconciliation Statements
The following statements reconcile the Council’s Comprehensive Income and Expenditure Statement and Balance
Sheet to the Group Comprehensive Income and Expenditure Statement and Balance Sheet.
6.1 Council Comprehensive Income and Expenditure Statement to Group Comprehensive Income and
Expenditure Statement
2020/21
Restated  
2021/22 
£000  £000
(137,398)
Total Comprehensive Income and Expenditure on the Council's
Comprehensive Income and Expenditure Statement (565,577)   
(Surplus)/Deficit arising from other entities included in the Group Accounts 
(1,710) Subsidiaries (8,843)
(1,586) Associates (1,078)
(18,352) Joint Ventures (33,093) 
Other Comprehensive (Income) and Expenditure 
4,281 Subsidiaries (632)
(617) Associates (7,283)
(155,382) Group total Comprehensive Income and Expenditure for the year (616,506)     
6.2 Council Balance Sheet to Group Balance Sheet
31 March
2021
Restated  
31 March
2022 
£000  £000
1,709,998 Net Assets on Council Balance Sheet 2,270,112 
Long Term Assets in Group Balance Sheet 
68,078 Investments in Associates  75,929
26,559 Investments in Joint Ventures 59,652
72,302 Subsidiary Non Current Assets 70,692 
Current Assets 
26,526 Subsidiaries 13,753 
Current Liabilities 
(8,015) Subsidiaries (2,151) 
Long Term Liabilities 
(509) Associates -
(51,616) Subsidiaries (33,621)
1,843,323 Net Assets on Group Balance Sheet 2,454,366   
1,709,998 Total Reserves on Council Balance Sheet 2,270,114 
Group Income and Expenditure and Other Reserves 
26,559 Joint Ventures 59,652
67,569 Associates 75,929
39,197 Subsidiaries 48,671
1,843,323 Total Reserves on Group Balance Sheet 2,454,366
Page 173 of 209

Page 174

Annual Accounts 2021/22
Notes to the Group Accounts 
- 92 -
7. Further Details on Consolidation  
Further information in respect of Companies consolidated within the Group Accounts above can be summarised
as follows:-
7.1 Subsidiaries
The following table has a more detailed breakdown of the figures included for Subsidiary Companies in the Group
Comprehensive Income and Expenditure. The figures below also include the adjustments made to the Council’s
Balance Sheet on consolidating the Council’s subsidiaries into the Group Accounts. 
2020/21
Restated 2021/22  
Campsies
Centre
C’nauld
Ltd
Fusion
Assets
Ltd 
North
L’shire
Properties
LLP
Culture
&
Leisure
NL Ltd
Campsies
Centre
C’nauld
Ltd
Fusion
Assets
Ltd 
North
L’shire
Properties
LLP
Culture
&
Leisure
NL Ltd  
£'000 £'000  £000 £000 £'000 £'000  £000 £000
Comprehensive
Income and
Expenditure
Statement          
Surplus/ (Deficit)
on Provision of
Service
(2,428) 343  2,934 861 - 611  667 7,565
Other
Comprehensive
Income and
Expenditure
- -  (357) (3,924) - -  632 -
Balance Sheet                     
Non-Current
Assets - 2,986  68,584 732 - 2,986  67,706 -
Current Assets          
Inventories - 3,204  - 58 - 2,884  - -
Short-Term
Debtors - 462  (842) 619 -         721  (1,516) -
Cash and Cash
Equivalents - 2,491  7,133 13,401 - 2,563  9,101 -
Current
Liabilities          
Short-Term
Creditors - (150)  (384) (6,119) - 347  (2,498) -
Short-Term
Borrowing - -  (1,258) - - -  - -
Long Term
Liabilities          
Long Term
Borrowing - -  (34,911) (53) - -  (33,686) -
Deferred Income - -  - - - -  - -
Capital Grants
Received in
Advance
- -  - - - -  - -
Pensions - -  (449) (16,203) - -  65 -
Reserves          
Income and
Expenditure - (7,389)  (15,073) (197) - (7,952)  - -
General Fund - -  - (8,139) - -  - -
Pension - -  449 16,203 - -  - -
Revaluation
Reserve - (406)  (23,248) - - (400)  (23,355) -
Other - (1,094)  (1) (302) - (1,148)  (15,816) - 
Page 174 of 209

Page 175

Annual Accounts 2021/22
Notes to the Group Accounts 
- 93 -
7.2 Joint Ventures         
The table below illustrates the Council’s payments to its Joint Ventures. 
2021/22  
Council Payments
to Entity
% of Entity's
Annual Turnover  
£000 %
Amey Public Services LLP 18,141 89.73
Mears Scotland LLP             48,856 100
NL Integration Joint Board 164,787 21.93   
The following disclosures are required for Amey Public Services LLP, Mears Scotland LLP and NL Integration
Joint Board because the Council holds more than 20% of the voting rights in each entity. 
2020/21 restated 2021/22  
Amey
Public
Services
LLP
Mears
Scotland
LLP
NL
Integration
Joint Board
Amey
Public
Services
LLP
Mears
Scotland
LLP
NL
Integration
Joint Board  
£000 £000 £000 £000 £000 £000
Comprehensive
Income and
Expenditure
Statement    
Gross Income 15,960 48,856 693,105 20,217 48,856 751,531
Net Profit/ (Loss)
before Taxation 367 415 36,704 562 1,181 66,334
Taxation - - - - - -
Net Profit/ (Loss)
after Taxation 367 415 36,704 562 1,811 66,334       
Balance Sheet      
Non-Current
Assets 87 282 - 89 78 -
Current Assets 3,618 12,209 53,118 3,325 10,419 119,452
Liabilities due
within one year (4,137) (11,876) - (3,287) (8,191) -
Liabilities due after
more than one year - (1,154) - - (1,663) -
Net Pension Asset - - - - - -
Provision for
Liabilities - - - - - -
Capital and
Revenue Reserves 432 539 (53,118) (127)  (642) (119,452) 
Group Accounts 2021/22 and Restated Group Accounts 2020/21  
In prior year, both Amey and Mears net assets/liabilities and surplus/deficit have been excluded from the group
statements in order to comply with IAS 28 which required that where NLC’s share of a Joint Venture’s liabilities
exceed it’s share of their assets, the body is excluded from the group statements. Both companies have made a
surplus during 2021/22 with a share of this up to the value of our share of net assets have been consolidated.
Page 175 of 209

Page 176

Annual Accounts 2021/22
Notes to the Group Accounts 
- 94 -
7.3 Associates 
The table below illustrates the Council’s contribution to its Associates and debtor/creditor balances relating to
Associates included in the Council’s Balance Sheet. 
2021/22  
Council
Payments
to Entity
% of
Entity's
Annual
Turnover
Council
Share of
Net Assets/
(Liabilities)
Debtors
included in
Council
Accounts
Creditors
Included in
Council
Accounts  
£000 % £000 £000 £000
Strathclyde Concessionary Travel
Scheme Joint Board  573 14.03 646 -  -
Strathclyde Partnership for Transport 5,453 7.11 73,655 -  -
Lanarkshire Valuation Joint Board 2,106 48.02 1,409 -  -
Routes to Work Limited 3,605 80.97 219 - -             
The following disclosures are required for Lanarkshire Valuation Board and Routes to Work Limited because the
Council holds 20% or more of the voting rights in the entity. 
2020/21 restated       2021/22 
Routes to
Work Ltd.
Lanarkshire
Valuation Joint
Board 
Routes to
Work Ltd.
Lanarkshire
Valuation
Joint Board  
£000 £000  £000 £000       
Comprehensive
Income and
Expenditure Statement     
Gross Income 2,775 4,472  4.452 4,386
Net Surplus / (Deficit) (10) (812)  45 (363)      
Balance Sheet     
Non-Current Assets 21 177  5 156
Current Assets 1,319 1,485  1,420 1,614
Liabilities due within one
year (288) (479)  (332) (225)
Long-Term Liabilities - -  - (1,273)
Retirement Benefit
Asset / (Liabilities) - (2,200)  - -
Accumulating
Compensated Absences - 121  - 90
Capital, Revenue &
Pension Reserves (1,052) 896  (1,093) (362) 
Page 176 of 209

Page 177

Annual Accounts 2021/22
Notes to the Group Accounts 
- 95 -
7.4 Annual Accounts 
The Annual Accounts of the Council’s Associates are subject to independent audit and are available from the
addresses below. 
Strathclyde
Concessionary Travel
Scheme Joint Board
Treasurer to Strathclyde Concessionary Travel Scheme, Strathclyde
Partnership for Transport, Consort House, 12 West George Street, Glasgow,
G2 1HN
Strathclyde Partnership
for Transport
Treasurer to Strathclyde Partnership for Transport, Consort House, 12 West
George Street, Glasgow, G2 1HN
Lanarkshire Valuation
Joint Board
Treasurer to Lanarkshire Valuation Joint Board, Council Offices, Almada
Street, Hamilton, ML3 0AB
Routes to Work Limited 168/170 Main Street, Bellshill, Lanarkshire, ML4 1AE 
8. Interests in Other Entities 
There are 13 related companies that have been identified as being relevant for group purposes as illustrated by
the flowchart on page 85.  Of these only two were considered out with the scope of the group: 
North Lanarkshire Municipal Bank Limited is a municipal bank which accepts deposits and invests those
funds (with the exception of working balances) with North Lanarkshire Council.   
Dunbartonshire Educational Trust Scheme 1962 is a charitable trust which provides grants for further/higher
education for those who live in the old county area of Dumbarton.  The Council has 28% voting rights on the Board
however on the grounds of materiality it has not been consolidated as part of the group.   
It should also be noted that the group accounts for both 2021/22 and the restated accounts for 2020/21 exclude
NLC’s share of the joint ventures Mears and Amey under compliance with IAS 28. 
Page 177 of 209

Page 178

Annual Accounts 2021/22
Remuneration Report
- 96 - 
Introduction
The Remuneration Report has been prepared in accordance with the Local Authority Accounts (Scotland)
Regulations 2014. These Regulations require disclosures about the remuneration and pension benefits of Senior
Councillors, Senior Employees and Senior Employees of Council subsidiary bodies whose remuneration is
£150,000 or more.  
Arrangements for Remuneration 
The remuneration of Councillors is regulated by the Local Governance (Scotland) Act 2004 (Remuneration)
Regulations 2007 (SSI No. 2007/183) as amended most recently by the Local Governance (Scotland) Act 2004
(Remuneration) Amendment Regulations 2021 (SSI 2021/18). The Regulations provide for the grading of
Councillors for the purposes of remuneration arrangements, as either the Leader of the Council, the Provost,
Senior Councillors or Councillors. The Leader of the Council and the Provost cannot be the same person for the
purposes of payment of remuneration. A Senior Councillor is a Councillor who holds a significant position of
responsibility in the Council’s political management structure.
When determining the level of remuneration for Councillors, the Scottish Ministers consider the recommendations
of the Scottish Local Authority Remuneration Committee (SLARC). SLARC was established under the provisions
of the Local Governance (Scotland) Act 2004 to advise Scottish Ministers on the remuneration (including
pensions), allowances and expenses incurred by local authority Councillors in accordance with criteria specified
by Scottish Ministers.  
The maximum salary that can be paid to the Leader of the Council is set out in the Regulations as £43,412. For
2021/22 the salary for the Leader of North Lanarkshire Council was £43,207. The Regulations permit the Council
to remunerate one Provost with a maximum salary of £32,560.  For 2021/22 the salary for the Provost of North
Lanarkshire Council was £32,406.
The Regulations also set out the remuneration that may be paid to Senior Councillors and the total number of
Senior Councillors the Council may have.  The maximum yearly amount that may be paid to a Senior Councillor is
75 per cent of the total yearly amount payable to the Leader of the Council.  The maximum yearly amount the
Council could remunerate all of its Senior Councillors for 2021/22 was £562,030.  The Council is able to exercise
local flexibility in the determination of the precise number of Senior Councillors and their salary within these
maximum limits.  The total remuneration paid to Senior Councillors (excluding the Leader of the Council and
Provost) was £486,058 in 2021/22.  
The Regulations also permit the Council to pay contributions or other payments as required to the Local
Government Pension Scheme in respect of those Councillors who elect to become Councillor members of the
pension scheme. 
In addition to the Senior Councillors of the Council, the Regulations also set out the remuneration payable to
Councillors with the responsibility of a Convener or Vice-Convener of a Joint Board such as the Lanarkshire Joint
Valuation Board. The Regulations require the remuneration to be paid by the Council of which the Convener or
Vice-Convener is a member. The Council is also required to pay any pension contributions arising from the
Convener or Vice-Convener being a member of the Local Government Pension Scheme. The Council is
reimbursed by the Joint Board for any additional remuneration paid to the member from being a Convener or Vice-
Convener of a Joint Board. 
The salary levels of Senior Employees are set by reference to national arrangements as well as local decisions
on management structures and their associated remuneration levels. The Scottish Joint Negotiating Committee
for Local Authorities Services (Chief Officials) sets the salary levels for the Chief Executives of Scottish Local
Authorities and also sets out the spinal column salary points for Chief Officers which local authorities can utilise
in setting the salary levels for posts within their authority. 
There are no other benefits included in the remuneration package for Senior Employees.   All information disclosed
in the following tables in this Remuneration Report will be subject to audit. The other sections of the Remuneration
Report will be reviewed by external audit to ensure that they are consistent with the financial statements.   
Page 178 of 209

Page 179

Annual Accounts 2021/22
Remuneration Report
- 97 - 
1. Trade Unions (Facility Time Publication Requirements) Regulations 2017
In addition to the regulations governing Senior Employees and Councillors, the Trade Union (Facility Time
Publication Requirements) Regulations 2017, which apply from 1 April 2017, require public sector employers to
collect and publish a range of information on trade union facility time in respect of their employees who are Trade
Union Representatives.  The following information has been taken from the payroll reporting system provided by
the Employee Service Centre.  
Number of employees who were relevant union
officials during the relevant period
FTE employee number
65 62.68
Percentage of time spent on facility time – the number of employees who were relevant trade union officials during
the year as a percentage of their working hours spent on facility time.
Percentage of time Number of representatives
0% 30
1-50% 33
51-99% 0
100% 2
Percentage of the total pay bill spent on facility time
Total cost of facility time (£) 120,272
Total pay bill (£) 588,914,152
Percentage of the total pay bill spent on facility time 0.02%
Time spent on paid trade union activities as a
percentage of total paid facility time hours
100% 
Page 179 of 209

Page 180

Annual Accounts 2021/22
Remuneration Report
- 98 - 
2. General Disclosure by Pay Band 
The following table is for actual remuneration paid to the employee, which includes salary and compensation for
loss of employment made in the year.  Any starters or leavers in the year are recorded in the remuneration band
which matches their actual remuneration for the year.
Remuneration Bands (£) 2020/21 2021/22
Officers Teachers Total Officers Teachers Total
50,000 - 54,999 118 255 373 143 260 403
55,000 - 59,999 39 176 215 104 184 288
60,000 - 64,999 33 110 143 30 106 136
65,000 - 69,999 21 51 72 25 52 77
70,000 - 74,999 7 8 15 25 10 35
75,000 - 79,999 2 8 10 6 6 12
80,000 - 84,999 2 1 3 - 3 3
85,000 - 89,999 4 9 13 1 5 6
90,000 - 94,999 14 1 15 - 2 2
95,000 - 99,999 - 2 2 7 3 10
100,000- 104,999 1 - 1 12 - 12
105,000 - 109,999 - - - - - -
110,000 - 115,999 - - - 2 - 2
125,000 - 129,999 - - - - - -
130,000 - 134,999 1 - 1 1 - 1
135,000 - 139,999 1 - 1 - - -
145,000 - 149,999 - - - 2 - 2
150,000 – 154,999 - - - 1 - 1
160,000 – 164,999 1 - 1 1 - 1
190,000 – 194,999 - - - 2 - 2
220,000 – 224,999 - - - 1 - 1       
244 621 865 363 631 994  
Page 180 of 209

Page 181

Annual Accounts 2021/22
Remuneration Report
- 99 - 
3. Remuneration
The following tables provide details of the remuneration paid to the Council’s Senior Councillors and Senior
Employees. The term remuneration means gross salary, fees and bonuses, allowances and expenses, and
compensation for the loss of employment. It excludes pension contributions made by the Council. Pension
contributions made to the person’s pension are disclosed as part of the pension benefits disclosure. 
a. Remuneration of Senior Councillors
Councillor Name Responsibility
2020/21
Total
Remuneration 
2021/22
Total
Remuneration  
£ £
James Logue Leader of the Council  41,688 43,207
Paul Kelly Depute Leader of the Council  31,131 32,406
Jean Jones Provost 31,131 32,406
Tom Castles Depute Provost  25,267 26,302
Robert Burrows Convener of Finance and Resources Committee 31,131 32,406
Harry Curran Convener of Planning Committee 25,267 26,302
William Shields Convener of Local Review Body       25,267 26,302
Thomas Johnston Leader of the SNP Group (until 8 March 2021) 23,675 -    
Jordan Linden Leader of the SNP Group (from 8 March 2021) 1,592 26,426
Thomas Morgan Convener of Adult Health and Social Care Committee (Until 1st April
21) 25,267 1,251
Tom Fisher Convener of Adult Health and Social Care Committee (From 1st April
21) - 21,687
Frank McNally Convener of Education and Families Committee 31,131 32,406
Nicky Shevlin
John McLaren
Convener of Regulatory Committee
Convener of Licensing Board 
25,267
25,267
26,302
26,302
Allan Graham Convener of Enterprise and Growth Committee 25,267 26,302
Michael McPake Convener of Environment and Transportation Committee 25,267 26,302
Heather Brannan-
McVey Convener of Housing and Regeneration Committee 31,131 32,406
Meghan
Gallacher Convener of Audit and Scrutiny Panel (Until 17 June 2021) 31,131 8,410
Alexander
Watson Convener of Audit and Scrutiny Panel (From 17 June 2021) - 23,996
Louise Roarty Business Manager  31,131 32,406
Kenneth Duffy Convener of Transformation and Digitisation Committee 25,267 26,302
Angela Campbell Convener of Community Empowerment Committee      25,267              26,302
Alex McVey Convener of Lanarkshire Joint Valuation Board 4,468 4,458
Total   542,010 560,589
Note
1. Senior Councillor means a Leader of the Council, a Civic Head or a Senior Councillor, all as defined by
regulation of the Local Governance (Scotland) Act 2004 (Remuneration) Regulations 2007(3).
2. The remuneration disclosed in the table above reflects amounts for service as Senior Councillors and does
not include any remuneration which relates to previous or subsequent appointment with the Council. 
3. No Councillor received any remuneration from a subsidiary as a representative of the Council. The Council
does not have any influence on remunerations awarded by subsidiaries.
4. The Joint Boards have an arrangement to reimburse the Council for the additional costs arising from a 
Councillor being a Convener, Vice-Convener or Depute Convener of the Board. The disclosures made in this
report are limited to the amounts paid to the Council by the Board for remuneration and does not reflect the
full value of the remuneration that may be paid to the Councillor.  The following Councillors served on Joint
Boards during 2021/22:
• Councillor A McVey was the Convener of the Lanarkshire Joint Valuation Board from 26 June 2017
and the Council was reimbursed £4,458 for 2021/22 (£4,468 for 2020/21).  
Page 181 of 209

Page 182

Annual Accounts 2021/22
Remuneration Report
- 100 - 
5.Councillor Morgan Left his position as Convener on 1st April but received a payment of 1250.53 during 2021/22
in relation to back pay.
b. Remuneration of Councillors
The Council paid the following renumeration to all Councillors (including the Senior Councillors above) during the
year. 
Type of Remuneration 2020/21 2021/22 
£ £
Salaries 1,539,231 1,632,919
Expenses 14,632 11,311
Total 1,553,863 1,644,230
Note: The annual return of Councillors’ renumeration for 2021/22 is available for any member of the public to view
on the Council’s website at www.northlanarkshire.gov.uk. Please follow the link on the Council’s website as
follows: Councillor Renumeration 2021/22
c. Remuneration of Council Senior Employees
Name Post Title 2020/21 2021/22  
Total
remuneration 
Salaries, fees
and
allowances
Compensation
for loss of
office
Total
remuneration  
£ £ £ £
Desmond
Murray 
Chief Executive  170,052  178,814 - 178,814
Robert
Steenson 
Executive Director (Enterprise and
Communities) 
136,270 139,520 100,479
Plus annual
Compensation
of £8,891
239,999
Elaine Kemp  Head of Financial Solutions (Section 95
Officer)
90,288 94,089 - 94,089
Katrina Hassell Head of Business Solutions  92,016 94,218 - 94,218
Fiona Whittaker Head of People and Organisational
Development 
92,017 93,143 - 93,143
Stephen
Penman
Head of Strategic Communications  92,096 99,208 - 99,208
Ross McGuffie Chief Officer (Health and Social Care). 101,601 102,730 - 102,730
Derek Brown  Executive Director (Education and
Families) 
134,348 137,063 - 137,063
Alison Gordon  Head of Children, Families & Justice
Social Work Services (Chief Social Work
Officer) 
92,017 93,132 - 93,132
Archie Aitken  Head of Legal & Democratic Solutions
(Monitoring Officer) 
92,652  99,208 - 99,208
Ken Adamson Head of Audit and Inspection 67,202 69,494 - 69,494
Total   1,160,559 1,200,619 100,479 1,301,098
1. Total remuneration disclosed relates to salary, fees and allowances and compensation for loss of employment. 
2. The 2021/22 remuneration in the table above includes election payments; Desmond Murray £8,099 (2020/21
£408) Elaine Kemp £980 (2020/21 £180), Katrina Hassell £1,200 (2020/21 £0), Stephen Penman £6,065
(2020/21 £0), Archie Aitken £6,065 (2020/21 £635) and Ken Adamson £1,300 (2020/21 £175). 
3. Robert Steenson was employed until 6 April 2022, however as the amounts were agreed during 2021/22 and
included in the council’s expenditure and exit package disclosures the inclusion in the above disclosure was
deemed to be appropriate to support overall transparency. The Local Government (Discretionary Payments
and Injury Benefits) (Scotland) Regulations 1998 make provision for authorities to make discretionary
payments to local government employees to pay compensation for premature retirement. Robert Steenson
has been credited with an additional period of service. A person who has been granted a credited period is
Page 182 of 209

Page 183

Annual Accounts 2021/22
Remuneration Report
- 101 - 
entitled to receive compensation in the form of a lump sum and annual compensation, both of which are
included within the compensation for loss of employment.  The disclosure includes all payments due. 
d. Remuneration of Council’s Subsidiary Bodies Senior Employees
Name Post Title 2020/21 2021/22  
Total
remuneration 
Salaries,
fees and
allowances
Compensation
for loss of office
Total 
renumeration  
£ £           £            £
David Baird 
Kenneth
McDonald 
Murray Collins 
Jillian Ferrie 
Surveying and Technical Manager,
North Lanarkshire Properties (until
30 November 2020) 
Surveying and Technical Manager,
North Lanarkshire Properties from
(01 December 2020) 
Managing Director, Fusion Assets 
Chief Executive, Culture and
Leisure NL (Until 30th April 2021)
42,496 
14,587 
71,727 
90,210 
-
44,922 
73,766 
4,670 
-
-
-
69,204 plus
annual
compensation of
£7,101
-
44,922 
73,766 
73,874
Emma Walker  Managing Director, Culture and
Leisure NL (until 2 June 2020)
92,059 - - -
Total   311,079 123,358  69,204 192,562
1. Total remuneration disclosed relates to salary, fees and allowances and compensation for loss of employment.
2. The Council has no influence over the remuneration provided by subsidiaries. 
4. Pension Benefits
The term pension benefits covers in-year pension contributions for the employee or Councillor by the Council and
the named person’s accrued pension benefits at the reporting date. 
All Senior Councillors and Senior Employees shown in tables a) and b) below are entitled to join the Local
Government Pension Scheme (LGPS).  The LGPS is a defined benefit statutory scheme, administered in
accordance with the Local Government Pension Scheme Regulations 2014. 
For most people, for service up to 31 March 2009, the annual pension is calculated by dividing their final pay by
80 (60 for service after 31 March 2009) and multiplying this by their total membership. Pensions payable are
increased annually in line with changes in the Consumer Price Index (CPI).  The lump sum, which is automatically
paid when the person retires for service up to 31 March 2009, is three times their annual pension and is tax-free.
There is no automatic lump sum for service after 31 March 2009.  
From 1 April 2015, the LGPS moved to a career average pension scheme at a rate of 1/49th of the amount of
pensionable pay received in the scheme that year.
A member’s contribution depends on their full-time equivalent pay and is payable in the financial year ended 31
March 2022 at the rate on the following bands of pay:  
Band Range Contribution Rate
1 On earnings up to and including £22,000 5.50%
2 On earnings above £22,001 and up to £27,100 7.25%
3 On earnings above £27,701 and up to £37,200 8.50%
4 On earnings above £37,201 and up to £49,600 9.50%
5 On earnings above £49,601 12.00%
The pension entitlements for Senior Councillors, Senior Employees of the Council and Subsidiary Bodies for the
year to 31 March 2022 are shown in the tables below, together with the contribution made by the Council or the
Subsidiary Body during the year.   
Page 183 of 209

Page 184

Annual Accounts 2021/22
Remuneration Report
- 102 - 
a. Pension Benefits of Senior Councillors
The pension benefits shown relate to the benefits that the individual has accrued as a consequence of their total
local government service and not just their current appointment. 
Councillor Name In-year pension
contributions
Accrued pension benefits 
For year to 
31 March 
2021
For year to 
31 March 
2022  
As at 
31 March 
2021
Movement 
In Year
As at 
31 March
2022 
£ £   £000 £000 £000       
James Logue 8,046 8,992 Pension
Lump Sum
9
3
2
-
11
3
Paul Kelly 6,008 6,745 Pension
Lump Sum
7
2
1
-
8
2
Jean Jones  - - Pension
Lump Sum
-
-
-
-
-
-
Tom Castles  - - Pension  - - -   
Lump Sum - - -
Robert Burrows 6,008 6,745 Pension
Lump Sum
7
2
3
-
10
2
Harry Curran  4,877 5,474 Pension
Lump Sum
6
1
1
-
7
1
William Shields 4,877 5,474 Pension
Lump Sum
5
1
1
-
6
1
Thomas Johnston 4,796 - Pension
Lump Sum
-
-
-
-
-
-
Jordan Linden - - Pension - - -   
Lump Sum - - -
Thomas Morgan 4,877 3,925 Pension
Lump Sum
4
-
1
-
5
-
Tom Fisher  - 5,403 Pension
Lump Sum
2
0
-
-
2
-
Frank McNally 6,008 6,745 Pension
Lump Sum
5
-
1
-
6
-
Nicky Shevlin 4,877 5,474 Pension
Lump Sum
6
2
1
-
7
2
John McLaren 4,877 5,474 Pension
Lump Sum
4
-
1
-
5
-
Allan Graham 4,877 5,474 Pension
Lump Sum
4
-
1
-
5
-
Michael McPake 4,877 5,474 Pension
Lump Sum
5
-
-
-
5
-
Heather Brannan-
McVey
6,008 6,745 Pension
Lump Sum
5
-
1
-
6
-
Meghan Gallacher 6,008 4,549 Pension
Lump Sum
2
-
1
-
3
-
Louise Roarty - - Pension - - -   
Lump Sum - - -
Kenneth Duffy 4,877 5,474 Pension
Lump Sum
2
-
-
-
2
-
Angela Campbell 4,877 5,474 Pension
Lump Sum
2
-
-
-
2
-
Alex McVey 4,292 4,817 Pension
Lump Sum
2
-
-
-
2
-
Alexander Watson - 6.049 Pension
Lump Sum
2
-
-
-
2
-
Total 91,067 104,507  90 15 105       
Page 184 of 209

Page 185

Annual Accounts 2021/22
Remuneration Report
- 103 - 
b. Pension Benefits of Council Senior Employees 
Name In-year pension contributions Accrued pension benefits
For year to 
31 March 
2021
For year 
31 March
2022  
As at 
31 March 
2021
Movement
in Year
As at 
31 March
2022 
£ £  £000 £000 £000       
Desmond Murray 32,705 37,472 Pension
Lump Sum
54
62
4
-
58
62
Robert Steenson 26,192 287,640 Pension
Lump Sum
66
111
6
1
72
112
Elaine Kemp 17,303 19,288 Pension
Lump Sum
34
48
2
1
36
49
Katrina Hassell 17,670 19,270 Pension
Lump Sum
43
74
2
1
45
75
Fiona Whittaker 17,687 19,306 Pension
Lump Sum
6
-
3
-
9
-
Stephen Penman 17,687 19,306 Pension
Lump Sum
20
-
2
-
22
-
Ross McGuffie 19,519 21,291 Pension
Lump Sum
8
-
2
-
10
-
Derek Brown 25,806 28,375 Pension
Lump Sum
15
-
3
-
18
-
Alison Gordon 17,687 19,303 Pension
Lump Sum
29
25
2
0
31
25
Archie Aitken 17,687 19,306 Pension
Lump Sum
40
60
3
1
43
61
Ken Adamson 12,883 14,152 Pension
Lump Sum
30
46
2
-
32
46
Total 222,826 504,709  771 35 806 
1. Prior year pension contributions are included for all Senior Officers which include prior appointments.
2. The Local Government (Discretionary Payments and Injury Benefits) (Scotland) Regulations 1998
make provision for authorities to make discretionary payments to local government employees to pay
compensation for premature retirement.  Robert Steenson has been credited with an additional period
of service and a payment of £259,415 was made to the pension fund. 
c. Pension Benefits of Council’s Subsidiary Bodies Senior Employees
Name In-year pension contributions Accrued pension benefits
For year to 
31 March 
2021
For year 
31 March
2022  
As at 
31 March 
2021
Movement
in Year
As at 
31 March
2022 
£ £  £000 £000 £000
David Baird 
Kenneth McDonald 
Murray Collins 
Jillian Ferrie
7,548 
2,827 
25,123 
15,410
-
9,573 
24,328 
2,204
Pension
Lump Sum
Pension
Lump Sum
Pension
Lump Sum
Pension
26
41
1
-
-
-
37
-
1
-
-
-
-
-
2
-
-
-
Emma Walker                 3,514  -
Lump Sum
Pension
Lump Sum
58
26
26
-
-
-
-
-
-
Total 54,422 36,105   215 1 2 
Page 185 of 209

Page 186

Annual Accounts 2021/22
Remuneration Report
- 104 - 
5. Exit Packages
North Lanarkshire Council terminated the contracts of a number of employees in 2020/21 and 2021/22 as part of
a series of workforce change exercises which gave rise to voluntary severance agreements.  
Exit package costs in the tables below have been allocated across the following four areas:
• Redundancy Lump Sums, representing the amount that North Lanarkshire Council pays to the individual in a
one-off lump sum in accordance with the Council’s severance policy and Payments In-lieu of Notice,
representing the amount that North Lanarkshire Council pays to an individual for a period of notice that the
individual is not required to work.
• Compensated Added Years (CAY) Lump Sum, representing the amount that North Lanarkshire Council pays
to the individual in a one-off lump sum, according to the CAY awarded.
• Strain Costs, representing the amount which North Lanarkshire Council is required to pay to the pension fund
because the employee has retired before the assumed retirement age which would result in a shortfall in
contributions up to the assumed retirement age.
• An estimate of the total exit package costs that may potentially be incurred by North Lanarkshire Council up
until the age at which the relevant employees are assumed to cease being members of the pension scheme
as required by the Local Authority Accounts (Scotland) Regulations 2014:
Exit Packages 2021/22   
Banding    Employees    
Total Exit
Package
Costs   
Redundancy
Lump Sums
CAY Lump
Sums
Strain Costs Estimated
CAY Liabilities 
No. £000 £000 £000 £000 £000       
£0-£20,000 6 24 - - - 24
£20,001-£40,000 5 135 - 5 - 140
£40,001-£60,000 6 258 - 70 - 328
£60,001-£80,000 3 186 - 32 - 218
£80,001-£100,000 2 138 - 31 - 169
£100,001-£150,000 9 427 20 420 239 1,106
£150,001-£200,000 2 76 11 210 87 384
£200,001-£250,000 1 23 7 131 76 237
£250,001-£300,000 1 19 - 114 139 272
£550,001-£600,000 1 74 27 259 210 569  
36 1,360 65 1,271 751 3,447 
Comparative Exit Packages 2020/21   
Banding    Employees     
Redundancy
Lump Sums
CAY Lump
Sums
Strain Costs Estimated
CAY Liabilities
Total Exit
Package
Costs 
No. £000 £000 £000 £000 £000       
£0-£20,000 5 71 - - - 71
£20,001-£40,000 18 546 - 15 - 561
£40,001-£60,000 11 437 4 78 27 546
£60,001-£80,000 8 240 7 240 54 541
£80,001-£100,000 1 33 - 65 - 98
£100,001-£150,000 9 204 47 422 514                1,187
£150,001-£200,000
£200,001-£250,000
4
2
82
51
36
14
303
166
317
256
738
487
£250,001 £300,000 - - - - - -
£550,001 £600,000 - - - - - -  
58 1,664 108 1,289 1,168 4,229 
Des Murray       Councillor James Logue
Page 186 of 209

Page 187

Annual Accounts 2021/22
Remuneration Report
- 105 - 
Chief Executive      Council Leader
Page 187 of 209

Page 188

Annual Accounts 2021/22
Statement of Responsibilities 
- 106 -
The Authority’s Responsibilities
The Authority is required to:
• make arrangements for the proper administration of its financial affairs and to secure that one of its officers
has the responsibility for the administration of those affairs. The Head of Financial Solutions has been
designated as that officer within North Lanarkshire Council
• manage its affairs to secure economic, efficient and effective use of resources and safeguard its assets
• ensure the Annual Accounts are prepared in accordance with legislation (The Local Authority Accounts
(Scotland) Regulations 2014) and the Coronavirus (Scotland) Act, and so far as is compatible with that
legislation, in accordance with proper accounting practices (section 12 of the Local Government in Scotland
Act 2003)
• approve the Annual Accounts for signature 
Signed on behalf of North Lanarkshire Council 
Councillor James Logue
Council Leader 
The Head of Financial Solutions Responsibilities
The Head of Financial Solutions is responsible for the preparation of the Authority's statement of accounts in
accordance with proper practices as set out in the CIPFA / LASAAC Code of Practice on Local Authority Accounting
in the United Kingdom (the Code).
In preparing this statement of accounts the Head of Financial Solutions has:
• selected suitable accounting policies and then applied them consistently
• made judgements and estimates that were reasonable and prudent
• complied with legislation
• complied with the Code of Practice on Local Authority Accounting in the United Kingdom (in so far as it is
compatible with legislation)
The Head of Financial Solutions has also:
• kept proper accounting records which were up to date
• taken reasonable steps for the prevention and detection of fraud and other irregularities 
Statement of Accounts
The Statement of Accounts presents a true and fair view of the financial position of the Council and its Group as at
31 March 2022, and its income and expenditure for the year ended 31 March 2022. 
Elaine Kemp, CPFA
Head of Financial Solutions 
Page 188 of 209

Page 189

Annual Accounts 2021/22
Annual Governance Statement 
- 107 -
1. Scope of responsibility 
1.1 North Lanarkshire Council is committed to ensuring that its business is conducted in accordance
with the law and proper standards, and that public money is safeguarded, properly accounted for,
and used economically, efficiently, and effectively. 
1.2 The council also has a duty under the Local Government in Scotland Act 2003 to demonstrate
Best Value by securing continuous improvement in performance. Good governance is central to
meeting Best Value obligations as effective governance and accountability arrangements, with
openness and transparency in decision-making, schemes of delegation, and effective reporting of
performance are essential for taking informed decisions and ensuring effective scrutiny of
performance and stewardship of resources. 
1.3 To maintain compliance in terms of ensuring good governance and delivering continuous
improvement, the council has adopted the principles and requirements of the Delivering Good
Governance in Local Government: Framework (2016) and accompanying Guidance Notes for
Scottish Local Authorities (2016) published by Chartered Institute of Public Finance and
Accountancy (CIPFA) in association with Society of Local Authority Chief Executives (SOLACE).   
1.4 To ensure its good governance arrangements are sound and the highest standards are met, the
council has set out its commitment to the national principles of good governance by determining
its own governance structure (local code) underpinned by these principles.  This local code is set
out in the Strategic Governance Framework.   
1.5 In discharging these duties Chief Officers and Elected Members are responsible for implementing
the council’s governance arrangements and ensuring the local code, the Strategic Governance
Framework, is assessed on an annual basis to ensure ongoing effectiveness and compliance. 
1.6 In this respect, the council has arrangements in place through the Corporate Management Team
to ensure appropriate and regular oversight, management, and reporting at a strategic level to
support delivery of The Plan for North Lanarkshire and Programme of Work.  A standing agenda
item for governance and risk further demonstrates the commitment to ensuring effective
corporate governance arrangements are in place.  As part of their annual evaluation process of
the Strategic Governance Framework and supporting review programme, the CMT is also
responsible for identifying improvement actions and/or future planned developments in relation to
key governance arrangements and continuous improvement. 
1.7 Independent and objective assurances are provided by Internal Audit whose function is designed
to add value and improve the council’s operations.  This in turn helps the council accomplish its
strategic ambitions by bringing a systematic, disciplined approach to evaluating and improving the
effectiveness of the council’s risk management, internal control, and governance processes.  The
council’s internal audit arrangements are consistent with the CIPFA Statement on the role of the
Head of Internal Audit in public service organisations (2019).   
1.8 Internal Audit activity is planned to enable an independent opinion to be given by the Head of
Audit and Risk each year on the adequacy and effectiveness of internal controls within the
council, including the systems designed to achieve the strategic ambitions of the council and
those that manage the material risks faced by the council.  It is noted, however, that the presence
of an effective internal audit function contributes towards, but is not a substitute for, effective
control.   
1.9 The purpose of the Audit and Scrutiny Panel, whose activities and functions comply with the
standards set out in CIPFA’s Position Statement: Audit Committees in Local Authorities (2018), is
to provide independent assurance to the council and those charged with governance on the
adequacy of the council's risk management framework and internal control environment.  In this
respect, the Panel is responsible for providing independent review of the council's governance,
risk management, performance, and control frameworks, and overseeing the financial reporting
and annual governance processes. It also oversees the council's internal and external audit
arrangements, helping to ensure efficient and effective assurance arrangements are in place. 
Page 189 of 209

Page 190

Annual Accounts 2021/22
Annual Governance Statement 
- 108 -
1.10 This statement also covers the organisations consolidated in the council’s Group Accounts. 
2. Strategic Governance Framework 
2.1 In February 2020, the Audit and Scrutiny Panel approved the council’s Strategic Governance
Framework as the council’s local code of governance aligned to the national Delivering Good
Governance in Local Government: Framework.  This sets out the elements and mechanisms
which form the council’s local code of governance and demonstrates North Lanarkshire Council’s
commitment to the principles of good governance. 
2.2 The Strategic Governance Framework is one of six inter-related corporate frameworks (Policy,
Governance, Performance, Self-Evaluation, Project Management, and the Framework for
Demonstrating Improved Outcomes for Communities) which is key to assessing the success of
The Plan for North Lanarkshire and monitoring delivery of the Programme of Work, while
ensuring each stage of delivery towards achieving the overall ambitions is appropriately planned,
guided, implemented, and governed. 
2.3 The council recognises that a crucial aspect in delivering good governance is the way that it is
applied.  The ethos of good governance cannot be achieved by structures, rules, and procedures
alone.  Effectively, good governance needs to be embedded within the council and its culture and
the need for, and value of, good governance must be explicit.  As such, any references that
require to be made to any one of the frameworks supporting The Plan for North Lanarkshire
references them all together at all times for completeness and to raise awareness of the role of
good governance in delivering the strategic ambition through the Programme of Work.   
2.4 The Strategic Governance Framework outlines the elements and mechanisms in place to ensure
appropriate oversight and governance of The Plan for North Lanarkshire and supporting
Programme of Work, and enables the council to monitor the delivery of its ambitions, while ensuring
arrangements for corporate governance, risk management, and internal financial controls are
sound. This is based on the following: 
• Identifying and setting out the council’s long-term strategic ambition and priorities in
The Plan for North Lanarkshire and ensuring the vision for inclusive growth and
prosperity for all is embedded throughout all other policy statements agreed by the
council as well as all strategic management, service delivery, and corporate
governance approaches.
• Establishing the six inter-related corporate frameworks (Policy, Governance,
Performance, Self-Evaluation, Project Management, and the Framework for
Demonstrating Improved Outcomes for Communities) and ensuring these
frameworks remain aligned to The Plan for North Lanarkshire and Programme of
Work through a regular review and refresh programme.
• Standing Orders that allow the council to delegate decision making to committees,
sub-committees, or officers and sets out the rules which apply to the running and
operation of council and committee meetings.
• A Scheme of Administration which clearly sets out functions, terms of reference, and
powers of the council and its committees and sub-committees and which is aligned
to the organisational structure to facilitate decision making in line with the council’s
strategy.
• A Scheme of Delegation to Officers which sets out the functions delegated to the
Chief Officers of the council.
• Financial Regulations and a Scheme of Financial Delegation which, as an integral
part of the council’s framework of internal financial controls, are designed to ensure
effective stewardship of North Lanarkshire Council funds. Compliance with these
regulations ensures that public money is safeguarded and properly accounted for,
and all financial transactions are undertaken in a manner which demonstrates
openness, transparency, and integrity.  The Financial Regulations form a key part of
the overarching Financial Strategy and the corporate governance arrangements of
the council.
• The Financial Strategy which - as the overarching framework that establishes the
Page 190 of 209

Page 191

Annual Accounts 2021/22
Annual Governance Statement 
- 109 -
financial strategies and policies to ensure effective financial governance, planning,
and management - also sets out the responsibility for safeguarding public funds
within the council and the role of the Section 95 Officer.  The strategies and policies
covered by the Financial Strategy include the Capital Strategy, Treasury
Management Strategy, Revenue Budget Strategy, and the Medium-Term Financial
Plan.
• A Risk Management Strategy with arrangements that reflect the council’s strategic
ambition at a corporate, service, and project level.  A key part of the system of
internal control, the council’s risk management arrangements are designed to
identify, assess, prioritise, and mitigate risks which impact on achievement of the
council’s priorities.  These arrangements are designed to enable the council to
perform well, to manage risk effectively, and to minimise any potential impacts on
service delivery and the achievement of planned outcomes.
• Codes of Conduct for Elected Members, Chief Officers, and Employees which
provide frameworks within which individuals are expected to undertake their duties
in a manner which meets the required standards for good governance.  This
includes ensuring declarations of interests and declarations for conflicts of interest
and gifts and hospitality are appropriately (and regularly) made and published.
• Ensuring legislative obligations are fulfilled through the statutory officer roles, i.e. the
posts of head of paid service, monitoring officer, chief financial officer (section 95
officer), and the chief social work officer.
• An Anti-Fraud Policy and Fraud Response Plan which sets out the council’s
expectations (which extends to all individuals and organisations with whom it deals)
in terms of acting honestly and with integrity and in safeguarding public resources. 
• A Whistleblowing Procedure which provides a mechanism for employees of the
council, and other workers within the council, to report a concern about serious
wrongdoing within the council and to do so with security and in confidence.
• A Corporate Management Team with a supporting meetings structure comprising
service Senior Management Team meetings, and Operational Management Team
meetings to cascade the context, deliverables, and accountabilities and ensure
consistency of message in the vision set out in The Plan for North Lanarkshire and
the delivery required through the Programme of Work.  All Heads of Service are
members of the CMT; this includes those Heads of Service who hold a statutory
officer role.
• An Audit and Scrutiny Panel whose activities and functions comply with the
standards set out in CIPFA’s Position Statement: Audit Committees in Local
Authorities (2018), and whose purpose is to provide independent assurance to the
council and those charged with governance on the adequacy of the council's risk
management framework and internal control environment.  
• A Strategic Performance Framework that aims to enable performance to be
measured and assessed at three levels within the council and includes target setting
and service and statutory reporting in line with an annual schedule.
• Comprehensive revenue budget and capital expenditure guidelines, with well-
established processes and systems to ensure regular monitoring and reporting, as
well as oversight and scrutiny by management and Elected Members.
• A range of programme Boards and working groups aligned to the delivery of specific
Programme of Work items, e.g. Strategic Capital Delivery Group, DigitalNL, Hub
Delivery Programme Board, and Data Governance.
• An Information Governance Policy Framework, comprising policies in terms of
records and information management, data protection, information handling and
classification, information risk, and information security to ensure proper recording of
information, appropriate access to that information including by the public, and
compliance with legislation.
• An Information Security Policy which aims to protect the council’s information
systems and physical assets including supporting processes, networks, and
equipment.  This is essential to ensure the council can continue to operate and
successfully deliver its functions, while finding the right balance between the
benefits and risks to the processing of information. 
• Publicly available complaints and freedom of information procedures with
Page 191 of 209

Page 192

Annual Accounts 2021/22
Annual Governance Statement 
- 110 -
management, monitoring, and reporting arrangements.
• A range of employment and other policies and the associated guidance documents
and forms which promote and support ethical behaviour and standards of conduct
by employees, along with an employee Performance Review and Development
(PRD) process, and access to a range of employee and Elected Members’ training
and development programmes and opportunities through LearnNL.
• Independent and objective assurances provided by Internal Audit whose function is
designed to add value and improve the council’s operations.  The Internal Audit
function operates within the Public Sector Internal Audit Standards (PSIAS) and the
council’s Internal Audit Charter. The service undertakes an annual programme of
work approved by the Audit and Scrutiny Panel which is based on the Internal Audit
Annual Plan. This plan is risk based and is periodically updated to reflect evolving
issues and changes.
• Independent and objective assurances provided by the external auditors through
their Annual Audit Report (AAR) process and a range of external audit and
inspection bodies. 
3. Review of effectiveness of governance arrangements 
3.1 The Annual Governance Statement has been prepared with evidence gathered from various
different sources to demonstrate that effective the council’s arrangements have been in place 
during 2021/22 and up to the date of the Annual Accounts.  The information gathered to inform
the evidence base is summarised in paragraphs 3.1.1 to 3.1.6 below. 
3.1.1 Heads of Service have reviewed the effectiveness of governance arrangements within their area
of responsibility by completing a Certificate of Assurance and updating a 75 point checklist
covering: the control environment, risk management, business planning / information / reporting,
financial control processes, project management, monitoring and corrective action, human
resources, arm’s length bodies, and assessing whether key controls have been applied during
2021/22.
• Through this process Heads of Service have confirmed corporate governance arrangements
and financial controls in their area of responsibility have been, or are, working well and there
are no other significant matters arising which would require to be raised specifically in the
Annual Governance Statement. 
3.1.2 The council’s seven arm’s length external organisations (ALEOs) have also completed a
Certificate of Assurance and updated the accompanying 58 point checklist to support the
preparation of the council’s statements on corporate governance and internal financial control for
year ending 31 March 2022.
• In this respect, the Chief Executive or Senior Representative for each of the ALEOs has
confirmed corporate governance arrangements and financial controls in their organisation
have been, or are, working well and there are no other significant matters arising which
would require to be raised specifically in the council’s Annual Governance Statement. 
3.1.3 Compliance with four specific CIPFA statements. 
(1) The CIPFA Statement on the role of the Head of Internal Audit in public service
organisations (2019).  
To enable the Head of Audit and Risk to fulfil his role in this respect, the Corporate
Management Team are required to ensure they “set out how the framework of assurance
supports the Annual Governance Statement and identify internal audit’s role within it”.  This
assurance is provided through the Strategic Governance Framework (which has undergone
an annual review and refresh process in order to identify how the effectiveness of the
council’s governance arrangements has been monitored and evaluated in the year) and
which was endorsed by the Corporate Management Team at its meeting in June 2022. 
In line with the Public Sector Internal Audit Standards (PSIAS), and the council’s Internal
Audit Charter, the Head of Audit and Risk has provided an annual opinion on the “overall
Page 192 of 209

Page 193

Annual Accounts 2021/22
Annual Governance Statement 
- 111 -
adequacy and effectiveness of the organisation’s framework of governance, risk
management, and control”.  The Corporate Management Team considered and noted the
Internal Audit annual report 2021/22 and annual opinion from the Head of Audit and Risk on
7th June 2022.  This report stated that the annual Internal Audit opinion is unqualified and
offers a generally positive view of the council’s governance and internal control
arrangements. 
More specifically the Internal Audit annual report 2021/22 states that it is the opinion of the
Head of Audit and Risk that “reasonable assurance can be placed on the adequacy and
effectiveness of the council’s framework of governance, risk management, and internal
control for the year ended 31st March 2022”. 
(2) CIPFAs Position Statement: Audit Committees in Local Authorities (2018).  
In this respect the activities and functions of the council’s Audit and Scrutiny Panel are
required to reflect the standards set out in the CIPFA Statement.   
The Strategic Governance Framework sets out the evidence in this respect and confirms that
during 2021/22 the purpose of the Audit and Scrutiny Panel was to “provide independent
assurance to the council and those charged with governance on the adequacy of the
council's risk management framework and internal control environment” and its activities
included providing an “independent review of the council's governance, risk management,
performance, and control frameworks and oversees the financial reporting and annual
governance processes” - as set out in the Scheme of Administration (December 2019). 
(3) The CIPFA Code of Practice on Managing the Risk of Fraud and Corruption (2014). 
This statement looks for compliance in terms of developing a strategy and identifying the
risks.  In this respect the council has a number of policies and procedures in place as noted
below: 
• Corporate Anti-Fraud Policy and Response Plan (updated in June 2017, review
scheduled to be undertaken during 2022/23).
• Whistleblowing Procedures (update approved in March 2022).
• Gifts and hospitality policy for employees (incorporated into the Employee Code of
Conduct in 2018) with a register that is updated every six months.
• Employee Code of Conduct (update approved in March 2021).
• Code of Conduct for Chief Officers (updated in November 2017, review scheduled to be
undertaken during 2022/23).
• Information Security Policy (update approved in June 2021). 
The identification of risks is carried out in line with the council’s Risk Management Strategy
and through the risk for serious organised crime, fraud, and corruption which sits within the
Corporate Risk Register.  The Head of Legal and Democratic Solutions (the council’s
Monitoring Officer) is the identified lead for this risk. 
The CIPFA statement also requires responsibility to be acknowledged.  In this respect the
Internal Audit annual report 2021/22 from the Head of Audit and Risk specifies that Internal
Audit “has responsibility for investigating, as appropriate, alleged frauds and irregularities
brought to our attention in accordance with the council’s anti-fraud policy. Where detailed
work is carried out, the findings are reported to the Chief Executive and/or the relevant Head
of Service with recommendations made which are designed to address any weaknesses
identified. Such work is reported to the Audit and Scrutiny Panel, as appropriate, in line with
the approved Internal Audit reporting protocol which forms part of the Internal Audit Charter.” 
The Internal Audit annual report 2021/22 from the Head of Audit and Risk has confirmed that
“All audit investigations of suspected fraud and/or irregularities are reported to the Panel in
line with the agreed Internal Audit reporting protocol. I am also pleased to be able to report
that there were no material frauds or irregularities identified in 2021-22 that I require to bring
to your attention”. 
(4) The CIPFA Statement on the role of the Chief Financial Officer in Local Government
Page 193 of 209

Page 194

Annual Accounts 2021/22
Annual Governance Statement 
- 112 -
(2016).  It is specified in this CIPFA Statement that the Annual Governance Statement is
required to “address the authority’s arrangements for financial and internal control and for
managing risk”.  This is addressed through the annual audit opinion provided by the Head of
Audit and Risk (referenced above).   
The extent of the council’s compliance in this respect (and the role of the Chief Financial
Officer therein) is further demonstrated through the self-evaluation exercise undertaken in
2022 which concluded that the council’s financial management practices comply with all
aspects of the CIPFA Financial Management Code.  The self-evaluation also confirmed that
the council’s Chief Financial Officer operates in a way that is consistent with the CIPFA
Statement. 
3.1.4 Various self-evaluation exercises have been undertaken by the council as part of the governance
and performance management arrangements. This has been undertaken in line with the
refreshed Strategic Self-Evaluation Framework and rolling review programme which were
approved by the Audit and Scrutiny Panel in September 2021. During 2021/22 five self-evaluation
exercises were completed in terms of: 
• Compliance with the CIPFA Financial Management (FM) Code.  This self-evaluation
concluded that the council’s financial management practices comply with all aspects of the
CIPFA FM Code with an average overall rating of 98% from the assessment team in terms of
strongly agreeing or agreeing the extent of compliance across all of the 17 financial
management standards.  This is supported by a significant bank of evidence collected
through a desktop exercise and substantiated by the assessment team which comprised
members of the Corporate Management Team.
• Reviewing the adequacy and effectiveness of the revised Corporate Management
Team arrangements including how well it operates as a vehicle for monitoring and
scrutinising progress implementing The Plan for North Lanarkshire and individual
Programme of Work items.  This self-evaluation identified that the Corporate Management
Team has a clear vision and effective leadership with a sound approach that provides a clear
direction for its work. In terms of deployment and assessment and review, it was considered
that the new arrangements had not yet had the time to be embedded fully.  Notwithstanding
this, the evidence suggests there is room for improvement in terms of ensuring that the
arrangements work effectively in practice and are implemented to their full potential.  As
such, a number of improvement actions (with responsibilities and timelines) have been
agreed for implementation during 2022/23.  
• Risk governance arrangements in respect of DigitalNL. This self-evaluation supported
the annual review of the DigitalNL Programme Risk Register and, while focusing on both the
risk management arrangements and the risks themselves for the DigitalNL programme, it
also considered the inter-relationships of associated programme risks across the three levels
in the organisation (project, service, corporate).  The findings from the self-evaluation
exercise were reported to the Transformation and Digitisation Committee in November 2021. 
One improvement action was identified - this was to consider the inter-connectedness of the
DigitalNL programme risks with those on the Corporate Risk Register and the Business
Solutions Service Risk Register to ensure risks are managed at the appropriate level in the
organisation, and the mitigating actions and controls are aligned and implemented
accordingly.
• Reviewing whether the arrangements for the Data Governance Board (DGB)
adequately contribute to the achievement of the council’s vision as detailed in the
Roadmap.  Undertaken at a time that followed changes to the membership of and
arrangements for the DGB, this self-evaluation identified two areas requiring improvement for
which an action plan has been agreed by the Board.  These improvement actions focus on
(a) those which require to be considered within the context of the efficient operation of the
DGB, and (b) those which require to be aligned to the combined Action Plan for the Board
(which comprises the Information Governance Action Plan and Data and Information
Management Strategic Roadmap work packages) to avoid any duplication and ensure a fully
integrated approach to improvement.  
• The effectiveness of current arrangements for the North Lanarkshire health and social
care IJB and how well the Board meets its intended outcomes.  Findings from this self-
evaluation exercise demonstrate the extent of the positive results and good practice
Page 194 of 209

Page 195

Annual Accounts 2021/22
Annual Governance Statement 
- 113 -
examples identified by the assessment team.  Only three areas for improvement were
identified and these aim to further strengthen existing arrangements and add value to
existing practices, rather than fill any gap or address any significant issue in terms of
effectiveness.  Findings from this exercise also serve to reassure the new members of the
IJB (both Elected Members and executive members) of the effectiveness of the current
arrangements for the Board and its supporting governance, and sets out the priorities for
improvement in this respect. 
3.1.5  The evidence has also included an annual review and refresh of the council’s Strategic
Governance Framework.  In this respect: 
• An annual review process is in place to fulfil the requirements of the national Delivering Good
Governance in Local Government: Framework.  This process also sets out the role of the
Chief Officers and Elected Members who are responsible for implementing the council’s
governance arrangements and ensuring the local code is assessed on an annual basis to
ensure ongoing effectiveness and compliance.  The annual review and update of the
Strategic Governance Framework was endorsed by the Corporate Management Team at
their meeting in June 2022 in line with their role to also identify any improvement actions
and/or future planned developments in relation to key governance arrangements and
continuous improvement activity.
• In line with the annual review process, each of the elements and mechanisms within the
Strategic Governance Framework have been reviewed with updates made as required to the
relevant documentation and hyperlinks, as well as the review timeframe and date of next
update, and the assessment of the current position (which includes the corresponding RAG
status). This process ensures all elements and mechanisms are as up to date as they
require to be while providing a method by which to identify and prioritise items requiring to be
reviewed and updated further. 
• An Internal Audit on Corporate Governance in March 2022 cited the formal assessment
process now in place through the Strategic Governance Framework and its accompanying
review programme as good practice.  It was also cited that there are now “formal and robust
arrangements” in place to ensure that such reviews are undertaken on an annual basis.  
• The Internal Audit on Corporate Governance also reported on the assessment of the
council’s local code against the Delivering Good Governance in Local Government:
Framework and found that this process was “generally robust and effective”. The findings
also noted that the assessment had indicated a “high level of compliance with the Corporate
Governance framework, which was broadly consistent with Internal Audit’s assessment
undertaken of Principles A and B”. 
3.1.6 Comments made by the external auditors and other audit and inspection bodies, feedback from
Elected Members and committees in their scrutiny role, and issues considered by the Audit and
Scrutiny Panel.   
4. Continuous improvement 
4.1 The Plan for North Lanarkshire sets the long-term strategic direction for the council, partners, and
other stakeholders and, most importantly, for each unique local community and the people who
Live, Learn, Work, Invest, and Visit within North Lanarkshire.  It’s a Plan with a shared ambition of
inclusive growth and prosperity for all and a fairer distribution of wealth across all local
communities.  The Plan provides a very clear and compelling narrative for the shared ambition
which the council (and partners) are working towards; a narrative that has become well
embedded throughout the strategic management, service delivery, and corporate governance
approaches across the council. 
4.2 The Programme of Work process (established in 2019) provides a clear roadmap for work across
council services and with partners.  Directing policies and plans to support delivery of The Plan
for North Lanarkshire, the Programme of Work is therefore instrumental in bringing together the
elements that support strategic planning, local development, enterprise activities, and community
investment in a cohesive manner.  
Page 195 of 209

Page 196

Annual Accounts 2021/22
Annual Governance Statement 
- 114 - 
4.3 Sitting alongside this - as a key aspect of the council’s strategic planning framework - is the
Strategic Policy Framework.  This specifies the hierarchy of strategies, policies, and plans which
underpin delivery of the long-term vision set out in The Plan for North Lanarkshire and ensures
that strategy and policy remain connected to delivery in order to collectively facilitate a co-
ordinated approach to identifying the resources and working practices needed to support delivery
of the long-term vision.  Through a structured approach, the Strategic Policy Framework aims to
ensure that strategies, policies, and plans are formulated, developed, implemented, monitored,
and reviewed in a consistent and transparent manner across the council.  The annual update to
the Strategic Policy Framework was approved by the Policy and Strategy Committee in March
2022. The supporting review programme ensures each of the strategies, policies, and plans are
up to date, reviewed and updated at an appropriate interval, and reported to the relevant
committee. 
4.4 The fourth annual iteration of the Programme of Work (for 2022/23) was approved by the Policy
and Strategy Committee in March 2022.  This reflects the changes required to deliver on the long-
term ambition and the broad range of innovative and transformative programmes of work and
projects required in order to maintain services for residents in local communities which are
efficient and effective, while targeting resources towards those individuals in the most vulnerable
situations and ensuring value for money. 
4.5 The council has long since recognised that it does not have the luxury of a traditional once and
done approach to strategic planning and change and the Programme of Work has enabled a
recurring and dynamic approach in this respect.  It has enabled delivery of the long-term vision to
be informed by an annual strategic planning process that is influenced by national policy changes
and new developments which impact on the achievement of the vision and which require due
consideration in future strategies, policies, plans, and programmes of work.  However, the
considerable challenges that remain across North Lanarkshire - as demonstrated by the latest
performance results reported to the Policy and Strategy Committee in March 2022 - means that
an even greater focus is required to escalate the pace and depth of change in order to maximise
positive outcomes for the people and communities of North Lanarkshire.  As such, a commitment
has been made to ensure further work is undertaken during 2022/23 to fundamentally evaluate
activities undertaken, resources expended, and results achieved against the direction of travel in
order to assess the impact towards achieving The Plan for North Lanarkshire’s long-term vision of
inclusive growth and prosperity for all. 
4.6 Key to assessing the success of The Plan for North Lanarkshire and monitoring delivery of the
Programme of Work (while ensuring each stage of delivery towards achieving the overall
ambitions is appropriately planned, guided, implemented, and governed) are six inter-related
corporate frameworks: 
• Strategic Policy Framework
• Strategic Governance Framework
• Strategic Performance Framework
• Strategic Self-Evaluation Framework 
• Project Management Framework 
• Framework for Demonstrating Improved Outcomes for Communities 
4.7 To ensure these frameworks remain aligned to The Plan for North Lanarkshire and Programme of
Work, all are on an annual review and refresh programme.  This also helps the council to ensure
it is proactive in responding to social, economic, and environmental trends and changes in
legislation and governance, as well as the broad range of national policy changes and new
developments. 
4.8 The Strategic Governance Framework has been developed taking into account the local
environment within which the council operates.  It brings the principles of good governance
together with legislative requirements and management processes by which the council is
directed and controlled and through which it is accountable to, engages with, and leads the local
community.  This aims to ensure the council is able to effectively pursue the long-term ambition
set out in The Plan for North Lanarkshire, while ensuring this is underpinned with control and the
Page 196 of 209

Page 197

Annual Accounts 2021/22
Annual Governance Statement 
- 115 -
management of risk, and: 
• Resources are directed in accordance with agreed policies and according to priorities and in
line with corporate programme and project management procedures.
• There is sound and inclusive decision making.
• There is clear accountability for the use of those resources in achieving defined outcomes for
service users and local communities. 
4.9 The annual review process now established through the Strategic Governance Framework
ensures that the council’s governance arrangements are regularly assessed for ongoing
effectiveness within the context of The Plan for North Lanarkshire. 
4.10 Following publication of the Accounts Commission’s Best Value Assurance Report (BVAR) for
North Lanarkshire Council in May 2019, updates on implementation of the eight
recommendations for improvement were reported to the Policy and Strategy Committee in
September 2019 and again in March 2020. The report in March 2020 consolidated the eight
improvement actions within the Programme of Work to strengthen a corporate and integrated
approach to improvement that supports delivery of The Plan for North Lanarkshire.  The external
auditors Annual Audit Report (AAR) for 2020/21 (reported to the Audit and Scrutiny Panel in
December 2021) concluded that four of the improvement actions were now complete, and noted
good or reasonable progress was being made regarding the remaining four. 
4.11 During 2021/22, the COVID-19 pandemic continued to impact on the council’s delivery of planned
day to day activities and achievement of strategic priorities, albeit to a lesser extent than the
previous year.  The impact of this is also recognised in the annual audit opinion from the Head of
Audit and Risk.  In line with the guidance set out by the Scottish Government, a COVID Operating
Model was approved at the Council meeting in March 2022.  This provides a template as to how
the council will operate over the next six months in a manner which recognises the ongoing risks
associated with the pandemic, sets out the routine protection measures to be adopted across all
council facilities, and allows for delivery of all council services in a manner more reflective to what
existed pre-pandemic. 
4.12 In line with the commitment to review the new hybrid working model (approved at Committee in
December 2021), there will also be a review of the COVID Operating Model within a similar
timeline. The purpose of this will be to reflect on any issues arising through its implementation
and to have regard to any change in national policy which is likely to be kept under review over
the same time period. 
4.13 Following the decision taken by the Policy and Strategy Committee at its meeting in January 2020
the insourcing of culture, sport and leisure services was effective from 1 April 2021, under the
new, focussed, and integrated Active and Creative Communities (ACC) team. 
4.14 Six monthly reports during 2021/22 have provided the Audit and Scrutiny Panel with oversight
and assurance of governance, financial governance, and risk management arrangements within
the council’s Arm’s Length External Organisations (ALEOs). The reports have also highlighted
where Covid has impacted on company operations, including the safeguards that were put in
place during the pandemic to maintain service delivery and ensure safe working practices and the
recovery strategies developed to resume service delivery as Covid restrictions were lifted. 
5. Current year issues arising from Internal Audit activity during 2021/22 
5.1 In his Internal Audit annual report for 2021/22, presented to the Chief Executive and Corporate
Management Team in June 2022 the Head of Audit and Risk provided an overview of the
activities of the Internal Audit section for the year 2021/22. 
5.2 This included highlights of issues arising from Internal Audit activity during the year.  In this
respect, the Head of Audit and Risk commented on the following: 
• The significant proportion of Internal Audit staff who were temporarily seconded to other
Page 197 of 209

Page 198

Annual Accounts 2021/22
Annual Governance Statement 
- 116 -
duties for a period during part of the year, in response to the pandemic. This impacted on the
ability of Internal Audit to undertake planned work and details of the impact on the work
programme and how outstanding work was prioritised were reported to the Audit and
Scrutiny Panel in March 2022. Although this has had some impact on Internal Audit’s ability
to deliver all planned work, the Head of Audit and Risk reported that “I am content that
sufficient work has been undertaken to support the preparation of my annual opinion”.
• A small number of audit assignments reported during 2021/22 which offered only limited
assurance. In all cases, management committed to a range of relevant improvement
actions, some of which have already been completed.  In this respect Internal Audit will
continue to monitor progress on these issues during 2022/23 to provide senior management
and the Audit and Scrutiny Panel with further assurance that relevant key controls are
operating effectively.
• The results from detailed Internal Audit work examining the council’s corporate governance
arrangements which suggest that compliance with the requirements of the corporate
governance framework adopted by the council continued to be positive with no significant
weaknesses or areas of concern highlighted.
• Internal Audit work which suggests that despite significant and increasing challenges, key
financial controls and financial management arrangements continued to operate to a
generally high standard within the council.
• All audit investigations of suspected fraud and/or irregularities are reported to the Audit and
Scrutiny Panel in line with the agreed Internal Audit reporting protocol.  There were no
material frauds or irregularities identified in 2021/22 that required to be brought to the
attention of the Corporate Management Team. 
• The ongoing need for the council to continue to respond to challenges arising from the public
health emergency but there was less direct pressure on governance and internal controls
than in 2020/21 when the council had to transition very quickly to significantly different ways
of operating with consequential impacts on governance, internal control, and risk
management arrangements.  
• While there are no issues that require the Head of Audit and Risk to quality his annual
opinion, there are a small number of areas highlighted which will continue to be the focus of
future audit coverage:
- Programme of Work reports to committee - which are considered not to always easily
allow elected members to monitor and/or assess progress against plans (timescales and
budgets). Similarly, there is currently no mechanism to easily allow senior management
to review progress across the range of Programme of Work activities. Management has
previously committed to improving the ability of key stakeholders to monitor the progress
of major projects / programme of work activities.
- The Strategic Performance Framework - supportive of the approach adopted, Internal
Audit recognises that implementation of effective, timely, and regular performance
reporting on key strategic and operational performance measures to the Corporate
Management Team and Service Committees has been significantly impacted over the
last two years due to the need to respond to, and prioritise resources as a result of, the
pandemic. 
- Current and future operating model - and the linked planned developments impacting
upon workforce, digital transformation, service re-design, assets, and governance and
how these actions are managed and progressed and the extent to which these
contribute towards the achievement of the council’s ambitions. 
5.3 Despite the challenges presented by the pandemic and notwithstanding the results of some
specific individual audit assignments, overall the Head of Audit and Risk reported that he was
satisfied that the council’s internal control and governance arrangements remained reasonably
robust throughout 2021/22. 
6. Previous year issues - 2020/21 
6.1 In his Internal Audit annual report for 2020/21 the Head of Audit and Risk provided an overview of
the activities of the Internal Audit section for that year.  While this included highlights of a number
of the more significant issues which arose from the work undertaken by Internal Audit during the
year, none of these required actions which carried forward into the following year or which have
not already been identified in paragraph 5.2 above.
Page 198 of 209

Page 199

Annual Accounts 2021/22
Annual Governance Statement 
- 117 - 
7. Certification 
7.1 In compliance with the Delivering Good Governance in Local Government: Framework (2016) the
council has systems in place to review and improve the governance and internal control
environment throughout the year. Issues for action have been identified and implementation will
be monitored and reported as part of the next annual review.   
7.2  It is our opinion that reasonable assurance can be placed upon the adequacy and effectiveness
of North Lanarkshire Council and its Group systems of governance. The annual review process
has demonstrated sufficient evidence that the council’s corporate governance arrangements have
operated effectively, and the council and its group companies comply with the relevant corporate
governance principles in all significant respects. 
Des Murray        Councillor James Logue
Chief Executive      Leader of the Council 
Page 199 of 209

Page 200

- 118 - 
Independent auditor’s report to the members of North Lanarkshire
Council and the Accounts Commission
Reporting on the audit of the financial statements
Opinion on financial statements
I certify that I have audited the financial statements in the annual accounts of
North Lanarkshire Council and its group for the year ended 31 March 2022
under Part VII of the Local Government (Scotland) Act 1973. The financial
statements comprise the council-only and group Comprehensive Income and
Expenditure Statements, Balance Sheets, Movement in Reserves Statements,
and Cash Flow Statements, the council-only Housing Revenue Account,
Council Tax Income Statement, the Non Domestic Rates Income Statement, the
Sundry Accounts Statement, and notes to the financial statements, including
significant accounting policies. The financial reporting framework that has been
applied in their preparation is applicable law and UK adopted international
accounting standards, as interpreted and adapted by the Code of Practice on
Local Authority Accounting in the United Kingdom 2021/22 (the 2021/22 Code).
In my opinion the accompanying financial statements:
• give a true and fair view in accordance with applicable law and the
2021/22 Code of the state of affairs of the council and its group as at 31
March 2022 and of the income and expenditure of the council and its
group for the year then ended;
• have been properly prepared in accordance with UK adopted
international accounting standards, as interpreted and adapted by the
2021/22 Code; and
• have been prepared in accordance with the requirements of the Local
Government (Scotland) Act 1973, The Local Authority Accounts
(Scotland) Regulations 2014, and the Local Government in Scotland
Act 2003. 
Basis for opinion
I conducted my audit in accordance with applicable law and International
Standards on Auditing (UK) (ISAs (UK)), as required by the Code of Audit
Practice approved by the Accounts Commission for Scotland. My
responsibilities under those standards are further described in the auditor’s
responsibilities for the audit of the financial statements section of my report. I
was appointed under arrangements approved by the Accounts Commission on
10 April 2017. The period of total uninterrupted appointment is six years. I am
independent of the council and its group in accordance with the ethical
requirements that are relevant to my audit of the financial statements in the UK
including the Financial Reporting Council’s Ethical Standard, and I have fulfilled
my other ethical responsibilities in accordance with these requirements. Non-
audit services prohibited by the Ethical Standard were not provided to the
council. I believe that the audit evidence I have obtained is sufficient and
appropriate to provide a basis for my opinion.
Page 200 of 209

Page 201

- 119 - 
Conclusions relating to going concern basis of accounting
I have concluded that the use of the going concern basis of accounting in the
preparation of the financial statements is appropriate.
Based on the work I have performed, I have not identified any material
uncertainties relating to events or conditions that, individually or collectively,
may cast significant doubt on the ability of the council and its group to continue
to adopt the going concern basis of accounting for a period of at least twelve
months from when the financial statements are authorised for issue.
These conclusions are not intended to, nor do they, provide assurance on the
current or future financial sustainability of the council and its group. However, I
report on the council’s arrangements for financial sustainability in a separate
Annual Audit Report available from the Audit Scotland website.
Risks of material misstatement
I report in my Annual Audit Report the most significant assessed risks of
material misstatement that I identified and my judgements thereon.
Responsibilities of the Head of Financial Solutions and Audit and
Scrutiny Panel for the financial statements
As explained more fully in the Statement of Responsibilities, the Head of
Financial Solutions is responsible for the preparation of financial statements that
give a true and fair view in accordance with the financial reporting framework,
and for such internal control as the Head of Financial Solutions determines is
necessary to enable the preparation of financial statements that are free from
material misstatement, whether due to fraud or error.
In preparing the financial statements, the Head of Financial Solutions is
responsible for assessing the ability of the council and its group to continue as a
going concern, disclosing, as applicable, matters related to going concern and
using the going concern basis of accounting unless there is an intention to
discontinue the operations of the council and its group.
The Audit and Scrutiny Panel is responsible for overseeing the financial
reporting process.
Auditor’s responsibilities for the audit of the financial statements
My objectives are to obtain reasonable assurance about whether the financial
statements as a whole are free from material misstatement, whether due to
fraud or error, and to issue an auditor’s report that includes my opinion.
Reasonable assurance is a high level of assurance, but is not a guarantee that
an audit conducted in accordance with ISAs (UK) will always detect a material
misstatement when it exists. Misstatements can arise from fraud or error and
are considered material if, individually or in the aggregate, they could
reasonably be expected to influence the decisions of users taken on the basis
of these financial statements.
Irregularities, including fraud, are instances of non-compliance with laws and
regulations. I design procedures in line with my responsibilities outlined above
to detect material misstatements in respect of irregularities, including fraud.
Procedures include:
Page 201 of 209

Page 202

- 120 - 
• obtaining an understanding of the applicable legal and regulatory
framework and how the council and its group is complying with that
framework;
• identifying which laws and regulations are significant in the context of
the council and its group;
• assessing the susceptibility of the financial statements to material
misstatement, including how fraud might occur; and
• considering whether the audit team collectively has the appropriate
competence and capabilities to identify or recognise non-compliance
with laws and regulations.
The extent to which my procedures are capable of detecting irregularities,
including fraud, is affected by the inherent difficulty in detecting irregularities,
the effectiveness of the council’s controls, and the nature, timing and extent of
the audit procedures performed.
Irregularities that result from fraud are inherently more difficult to detect than
irregularities that result from error as fraud may involve collusion, intentional
omissions, misrepresentations, or the override of internal control. The capability
of the audit to detect fraud and other irregularities depends on factors such as
the skilfulness of the perpetrator, the frequency and extent of manipulation, the
degree of collusion involved, the relative size of individual amounts
manipulated, and the seniority of those individuals involved.
A further description of the auditor’s responsibilities for the audit of the financial
statements is located on the Financial Reporting Council's website
www.frc.org.uk/auditorsresponsibilities. This description forms part of my
auditor’s report.
Reporting on other requirements
Opinion prescribed by the Accounts Commission on the audited
part of the Remuneration Report
I have audited the part of the Remuneration Report described as audited. In my
opinion, the audited part of the Remuneration Report has been properly
prepared in accordance with The Local Authority Accounts (Scotland)
Regulations 2014.
Other information 
The Head of Financial Solutions is responsible for other information in the
annual accounts. The other information comprises the Management
Commentary, Annual Governance Statement, Statement of Responsibilities and
the unaudited part of the Remuneration Report. 
My responsibility is to read all the other information and, in doing so, consider
whether the other information is materially inconsistent with the financial
statements or my knowledge obtained in the course of the audit or otherwise
appears to be materially misstated. If I identify such material inconsistencies or
apparent material misstatements, I am required to determine whether this gives
rise to a material misstatement in the financial statements themselves. If, based
Page 202 of 209

Page 203

- 121 - 
on the work I have performed, I conclude that there is a material misstatement
of this other information, I am required to report that fact. I have nothing to
report in this regard.
My opinion on the financial statements does not cover the other information and
I do not express any form of assurance conclusion thereon except on the
Management Commentary and Annual Governance Statement to the extent
explicitly stated in the following opinions prescribed by the Accounts
Commission.
Opinions prescribed by the Accounts Commission on the Management
Commentary and Annual Governance Statement
In my opinion, based on the work undertaken in the course of the audit:
• the information given in the Management Commentary for the financial
year for which the financial statements are prepared is consistent with
the financial statements and that report has been prepared in
accordance with statutory guidance issued under the Local Government
in Scotland Act 2003; and
• the information given in the Annual Governance Statement for the
financial year for which the financial statements are prepared is
consistent with the financial statements and that report has been
prepared in accordance with the Delivering Good Governance in Local
Government: Framework (2016).
Matters on which I am required to report by exception
I am required by the Accounts Commission to report to you if, in my opinion:
• adequate accounting records have not been kept; or
• the financial statements and the audited part of the Remuneration
Report are not in agreement with the accounting records; or
• I have not received all the information and explanations I require for my
audit; or
• there has been a failure to achieve a prescribed financial objective.
I have nothing to report in respect of these matters.
Conclusions on wider scope responsibilities
In addition to my responsibilities for the annual accounts, my conclusions on the
wider scope responsibilities specified in the Code of Audit Practice, including
those in respect of Best Value, are set out in my Annual Audit Report.
Use of my report
This report is made solely to the parties to whom it is addressed in accordance
with Part VII of the Local Government (Scotland) Act 1973 and for no other
purpose. In accordance with paragraph 120 of the Code of Audit Practice, I do
Page 203 of 209

Page 204

- 122 - 
not undertake to have responsibilities to members or officers, in their individual
capacities, or to third parties. 
Brian Howarth ACMA CGMA,
Audit Scotland,
8 Nelson Mandela Place,
Glasgow,
G2 1BT,
27 October 2022
Page 204 of 209

Page 205

Annual Accounts 2021/22
Glossary of Terms 
- 123 -
Whilst much of the terminology used in this report is intended to be self-explanatory, the following additional
definitions and interpretation of terms may be of assistance.   
Accruals
The concept that income and expenditure are recognised as they are earned or incurred, not as money is received
or paid. 
Actuarial Gains and Losses (Pensions)
For a defined benefit pension scheme, the changes in actuarial deficits or surpluses that arise because events have
not coincided with the actuarial assumptions made for the last valuation (experience gains and losses) or the
actuarial assumptions have changed. 
Associates
These are entities (other than a subsidiary or a joint venture) in which the Council has a participating interest or
over whose operating and financial policies the Council is able to exercise significant influence. 
Capital Adjustment Account
The Capital Adjustment Account represents timing differences between the amount of the historical cost of non-
current assets that has been consumed and the amount that has been financed in accordance with statutory
requirements. 
Capital Expenditure
Expenditure on the acquisition of a non-current asset, which will be used in providing services beyond the current
accounting period, or expenditure which adds to and not merely maintains the value of an existing non-current
asset. 
Capital Financing
Funds raised to pay for capital expenditure. There are various methods of financing capital expenditure including
borrowing, leasing, capital receipts and grants, and revenue funding. 
Capital Receipt
The proceeds from the disposal of land or other non-current assets. 
Capital Receipts Reserve
The Capital Receipts Reserve represents the capital receipts available to finance capital expenditure in future years
after setting aside the statutory amounts for the repayment of external loans.   
Community Assets
Assets that the Council intends to hold in perpetuity, that have no determinable useful life and that may have
restrictions on their disposal. Examples of community assets are municipal parks. 
Contingent Liability
A contingent liability is either:
• A possible obligation arising from past events whose existent will be confirmed only by the occurrence of
one or more uncertain events not wholly within the Council’s control; or
• A present obligation arising from past events where it is not probable that a transfer of economic benefits
will be required, or the amount of the obligation cannot be measured with sufficient reliability. 
Corporate and Democratic Core
The Corporate and Democratic Core comprises all activities which local authorities engage in specifically because
they are elected multi-purpose authorities. The cost of these activities are thus over and above those which would
be incurred by a series of independent, single purpose, nominated bodies managing the same service. 
Defined Benefit Pension Scheme
Pension schemes in which the benefits received by the participants are independent of the contributions paid and
are not directly related to the investments of the scheme. 
Depreciation
The measure of the cost of wearing out, consumption or other reduction in the useful economic life of the Council’s
non-current assets during the accounting period, whether from use, the passage of time or obsolescence through
technical or other changes. 
Page 205 of 209

Page 206

Annual Accounts 2021/22
Glossary of Terms 
- 124 -
Exceptional Items
Material items which drive from events or transactions that fall within the ordinary activities of the Council and which
need to be disclosed separately by virtue of their size or incidence to give fair presentation of the accounts. 
Extinguishment
Extinguishment relates to financial liabilities and occurs when the Council’s legal obligations end, either through the
cancellation or expiry of the obligations or through payment being made to settle the amount owed by the Council. 
Fair Value
The fair value of an asset is the price at which it could be exchanged in an arm’s length transaction, less where
applicable, any grants receivable towards the purchase or use of the asset. 
Finance Lease
A lease that transfers substantially all the risks and rewards of ownership of a non-current asset to the lessee. 
Financial Instruments Adjustment Account
The Financial Instruments Adjustment Account is a balancing account to allow for differences in statutory
requirements and proper accounting practices for borrowing and lending.  This account is a technical accounting
presentation and is not available for distribution. 
Heritage Asset
A tangible or intangible asset with historical, artistic, scientific, technological, geophysical or environmental qualities
that is held and maintained principally for its contribution to knowledge and culture. 
Impairment
A reduction in the value of a non-current asset to below its carrying amount on the Balance Sheet. 
Infrastructure Assets
Non-current assets belonging to the Council that cannot be transferred or sold, on which expenditure is only
recoverable by the continued use of the asset created. Examples are highways, footpaths and bridges. 
Intangible Asset
Non-current asset belonging to the Council which lacks physical substance. Examples include computer software,
licensing agreements, patents and copyrights. 
Inventories
Items of raw materials and stores a Council has procured and holds in expectation of future use. Examples are
consumable stores, raw materials and products and services in intermediate stages of completion 
Joint Venture
An entity in which the Council has an interest on a long-term basis and is jointly controlled by the Council and one
or more entities under a contractual or other binding agreement.   
Liability
A liability is where the Council owes payment to an individual or another organisation. A current liability is an amount
which will become payable or could be called in within the next accounting period e.g. creditors or cash overdrawn.
A non-current liability is an amount which by arrangement is payable beyond the next year at some point in the
future or to be paid off by an annual sum over a period of time. 
Non Distributed Costs
These are overheads for which no user now benefits and as such are not apportioned to services. 
National Non Domestic Rates Pool
All non domestic rates collected by local authorities are remitted to the national pool and thereafter distributed to
Councils by the Scottish Government. 
Operating Lease
A lease where the ownership of the non-current asset remains with the lessor.  
Page 206 of 209

Page 207

Annual Accounts 2021/22
Glossary of Terms 
- 125 -
Past Service Cost (Pensions)
For a defined benefit scheme, the increase in the present value of the scheme liabilities relating to employee service
in prior periods arising in the current period as a result of the introduction of, or improvement to retirement benefits. 
Pension Reserve
This represents the difference between accounting for pension costs in line with UK Accounting Standards and the
funding of pension costs from taxation in line with statutory requirements and is equal to the change in the pension
liability, i.e. the commitment to provide retirement benefits.   
Provision
An amount put aside in the accounts for future liabilities or losses which are certain to very likely to occur but the
amounts or dates of when they will arise are uncertain. 
Public Works Loan Board (PWLB)
A Central Government Agency, which provides loans for one year and above to Councils at interest rates only
marginally higher than those at which the Government can borrow itself. 
Rateable Value
The annual assumed rental of a hereditament, which is used for national non-domestic rates purposes.  
Remuneration
All sums paid to or receivable by an employee and sums due by way of expenses allowances (as far as these sums
are chargeable to UK income tax) and the money value of any other benefits received other than in cash. 
Reserves
The accumulation of surpluses, deficits and appropriation over past years. Reserves of a revenue nature are
available and can be spent or earmarked at the discretion of the Council. Some capital reserves such as the Capital
Adjustment Account and Revaluation Reserve cannot be used to meet current expenditure. 
Subsidiary
An entity which the Council wholly or partly controls. 
Trust Funds
Funds administered by the Council for such purposes as prizes, charities and specific projects.
Page 207 of 209

Page 208

Page 208 of 209

Page 209

This document can be made available in a range of languages and formats, including
large print, braille, audio, electronic and accessible formats.
To make a request, please contact Corporate Communications at:
corporatecommunications@northlan.gov.uk
’S urrainn dhuinn an sgrìobhaidh seo a chur ann an diofar chànanan agus chruthan, a’ gabhail a-steach clò mòr,
braille, cruth claisneachd agus cruthan dealanach agus ruigsinneach.
Gus iarrtas a dhèanamh, cuir fios gu Conaltradh Corporra aig: 
corporatecommunications@northlan.gov.uk
Niniejszy dokument można otrzymać w wielu różnych językach i formatach, w tym również dużym drukiem,
alfabetem Braille’a, w wersji dźwiękowej, elektronicznej i w innych dostępnych formatach.
Prośby należy składać na ręce zespołu ds. komunikacji drogą elektroniczną na adres: 
corporatecommunications@northlan.gov.uk
此文件可以多种不同语言和格式提供,包括大字体、点字、音频、电子和易读格式。
如想提出请求,请联系企业传讯部:corporatecommunications@northlan.gov.uk
۔ ہے سکتا جا ایکیا ہمافر یمیں ںتورصو ئیسار بلقا روا نکار ٹ یلیکٹرا ،وی�ڈآ ، ی�بر ،فوحر ےبڑ لبشمو ںتورصو روا ںنوباز مختلف کو ر�ی�وستاد سا
corporatecommunications@northlan.gov.uk : ی
ئیں
�مافر بطہار پر سا سے ر����ش�ی�کی���و یکمیو ٹ ی�رپورکا یلیے کے ستاخورد مکر ہابر
CC_2022_00125
Produced by
NORTH LANARKSHIRE COUNCIL
Chief Executive’s Office
Civic Centre
Windmillhill Road
Motherwell ML1 1AB
e. annualaccounts@northlan.gov.uk
NORTHLANARKSHIRE.GOV.UK
Page 209 of 209