North Lanarkshire Council
Report
Audit and Scrutiny Panel
Does this report require to be approved? ☒ Yes   ☐ No
Ref KH/JL Date 08/09/22
Arm’s Length External Organisations: Governance and Risk
Management: Oversight and Assurance Report 2022/23
(Programme of Work 75.1 – part 2) 
From  Katrina Hassell, Head of Business and Digital  
E-mail hassellK@northlan.gov.uk Telephone 07903 096121 
Executive Summary
The council delivers a number of frontline and business-focused services through arm’s
length external organisations (ALEOs) which have been developed over the past 20 years to
provide services in new ways that are innovative, responsive or more commercially driven.
The council must have confidence in the quality of service delivery and obtain assurances,
through robust monitoring, scrutiny and oversight, that the public purse continues to secure
best value and the externalised delivery arrangements are not exposing the council to
potential operational, financial or reputational risks. 
This report provides an overview of the ALEO landscape and the performance and financial
monitoring safeguards that are in place to provide such assurance. The report confirms that
ALEO Boards and Management Committees continue to demonstrate effective stewardship
with robust governance, financial governance and risk management arrangements in place. 
In recent years the number of council owned ALEOs has reduced following service review
activity, or external factors, which highlighted that service provision via the externalised
delivery vehicles no longer represented best value for the council. As such, the council has
taken separate decisions to either in-source service delivery or cease provision, with the
assets and responsibilities of the individual companies transferred accordingly and the
companies formally wound-up and struck-off with all due diligence considerations adhered
to. This report provides an update on the status of current dissolution activity providing an
assurance to members that council decisions are being effectively and timeously
implemented.
Recommendations
The Audit and Scrutiny Panel is requested to: 
1) Note the nature and range of services provided by arm’s length bodies and the
governance and stewardship arrangements in place to ensure effective, efficient
and responsive service delivery;
2) Scrutinise the performance monitoring and oversight arrangements in place and
confirm that these are suitably robust and provide appropriate opportunity for the
council to obtain the necessary assurances that service delivery reflects Best
Value; and
3) Endorse current activity to wind-up the business and affairs of a small number of
existing ALEOs where the council has previously agreed to in-source or cease
service delivery.

Page 2

1. Background 
1.1. North Lanarkshire Council delivers a number of its customer-facing services via Arm’s
Length External Organisations (ALEOs) and strategic partnerships. These outsourced
arrangements have been established over previous years to provide an alternative,
and in many cases more innovative method of service provision, or to ensure a
commercially driven focus in delivery of the council’s business functions. 
1.2. The ALEOs are separate legal entities in their own right, with their own governance
and financial management obligations, however, the council remains accountable for
service delivery, whether performed in-house or through alternate, arm’s length
arrangements. As such it is imperative that the council regularly reviews and
scrutinises the individual ALEOs’ operational and financial performance to ensure
robust stewardship and quality of service delivery, whilst also minimising financial,
service delivery and reputational risks to the council. 
1.3. This report provides members with an overview of the council’s ALEO landscape and
the reporting arrangements in place, along with assurance in relation to governance
and risk management arrangements in the individual companies. As previously
requested by members of the Audit and Scrutiny Panel in March 2022, the report also
includes an update on progress in the dissolution and striking-off of those companies
where the council has previously taken the decision to insource or cease service
delivery. 
2. Report 
2.1. Although the council has reduced the number of ALEOs in recent years, the authority
continues to have significant interest in a number of separate companies and
statutory bodies and must therefore ensure that services are being delivered as per
the council’s expectations, to a high standard and in line with the contractual
arrangements and The Plan for North Lanarkshire. Table 2.1 below summarises
service delivery by ALEOs, or through the joint venture partnership agreements in
place with Amey and Mears. 
ALEOs – where the company(ies) are wholly owned by the council through 100%
shareholding
• Employability services including training, and
support for people who are furthest from the
labour market
Routes to Work Limited (Ltd)
• Commercial property letting
• General lease advice to the council including
management of the retained commercial
properties
North Lanarkshire Properties LLP
and North Lanarkshire Property
(Investments) Ltd
• Economic regeneration and infrastructure
investment
Fusion Assets Ltd
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning

Page 3

ALEOs – where the company(ies) are wholly owned by the council through 100%
shareholding
• Deposit banking savings facility (to 30 September
2022)
North Lanarkshire Municipal Bank
Ltd
Joint Venture Companies – formal partnership arrangements where the council
has 33% shareholding and the parent company holds the remaining 66%
• Housing repairs 
• Corporate properties’ repairs and maintenance
Mears Scotland Limited Liability
Partnership (LLP)
• Roads and streetlighting repairs
• Winter maintenance
Amey Public Services LLP
Table 2.1 
2.2. Appendix 1 provides further information on each of the above including:
• A summary of each company’s objectives and incorporation status;
• Board or Management Committee composition; and,
• The service committee responsible for monitoring and scrutiny. 
Council Scrutiny and Performance Reporting 
2.3. The council has robust performance monitoring and management arrangements in
place which have been developed and strengthened in recent years through a range
of measures including the ALEO Review Programme, to ensure that the council’s
externalised service delivery arrangements continued to demonstrate Best Value;
and, the Strategic Performance Monitoring Framework which sees individual ALEOs’
operational and financial performance reported to the relevant service committee
every six months. In addition, Audit and Scrutiny Panel members consider this
composite assurance and oversight report every six months, providing members with
the opportunity to review ALEO governance, financial governance, risk management
or any other matters where there may be the potential for operational, financial or
reputational risks to the council. 
2.4. Further liaison and monitoring arrangements are described at Appendix 2. This
ongoing dialogue between and the council and the ALEOs, further enhanced through
the appointment of elected members and senior officers to serve as Directors on the
individual Boards or Management Committees, creates the platform for collaborative
working opportunities and ensures that the ALEOs’ business objectives are aligned to
support delivery of The Plan for North Lanarkshire. Regular engagement also
provides early indication of any potential service delivery constraints and provides an
opportunity to highlight successes or service innovation, and promote collaborative
working, 
Statutory Bodies 
2.5. The statutory bodies, Strathclyde Partnership for Transport (including the Strathclyde
Concessionary Travel Scheme) Lanarkshire Valuation Joint Board and the Health and
Social Care Partnership all receive revenue funding from the council to provide
services in North Lanarkshire and the council must assure itself that these are being
delivered to a high standard and support our strategic direction. The level of
performance monitoring and oversight, however, must take cognisance of wider
scrutiny that is already in place through legislation and public accountability, and also
the likely level of potential risk to the council. To this end, Strathclyde Partnership for
Transport (including Concessionary Travel) and Lanarkshire Valuation Joint Board

Page 4

are both subject to annual reporting to the Environment and Place and Policy and
Strategy Committees respectively. 
2.6. The Health and Social Care Partnership is governed through the Integration Joint
Board as per the Public Bodies (Joint Working)(Scotland) Act 2014, and a separate
Performance, Finance and Audit Committee provides oversight of operational and
financial performance including risk management. 
Governance Oversight and Assurance Update 
2.7. The individual ALEOs and Strategic Partnerships have predominantly returned to
business as usual with hybrid working arrangements in place. The companies are
organising induction training, and site or office visits as appropriate, for the new
members appointed to Board and Management Committees. Appendix 3 provides
updates for each of the ALEOs confirming that Boards and Management Committees
are meeting regularly; summarising the impact and recovery from Covid-19; and,
identifying the top five risks for each entity. Audit and Scrutiny Panel members can
take assurance that effective governance arrangements and robust financial
stewardship are in place within each company. 
Financial Governance 
2.8. The council has a duty under its “Following the Public Pound” obligations to ensure
that the ALEOs are financially sound. The Council’s Section 95 Officer is responsible
for maintaining appropriate and proportionate processes and procedures for
scrutinising ALEOs’ financial performance. The individual contractual arrangements,
between the council and each company specify the financial information which each
ALEO must submit to the council and this enables Financial Solutions to assess and
report on any potential financial risk likely to arise as a result of the council using the
ALEO to deliver services. Paragraphs 2.9 and 2.10 describe, by exception, financial
matters that require close monitoring by the individual ALEOs’ Board of Directors or
Management Committees, along with robust, separate oversight by Financial
Solutions. 
North Lanarkshire Properties LLP (NLP) 
2.9. North Lanarkshire Properties (NLP), although still continuing to experience a
reduction in rental income as a result of the pandemic, has not experienced any
additional adverse impact on collections due to the outbreak of the Omicron variant,
the ending of the furlough scheme or withdrawal of other business support. The
company is proactive in its approach and continues to assess the forecast impact on
rent collection levels and long-term debt recovery. The council has provided NLP with
a letter of comfort to support NLP’s financial sustainability, however NLP will utilise
accumulated reserves to sustain financial operations whilst continuing to progress
their recovery plan and investment strategy towards longer term financial security. 
Routes to Work Ltd 
2.10. The Board of Directors considered an update on the charity’s Risk Register at the
meeting held on 23 June 2022 and identified four new or heightened risks which will
require ongoing monitoring by Board members and Financial Solutions. The risks are
linked to:
• uncertainty of future funding commitments beyond 31 March 2023 to enable the
charity to continue to operate at its current scale and capacity levels;
• Sustaining reserves at the levels previously approved by the Board;

Page 5

• Failure to secure a significant portion of funding from the UK Shared Prosperity
Fund; and,
• Unsuccessful transition to new organisational management and delivery
structure from 1st October 2022. 
The charity has identified control measures for each of these and they will be
monitored by the Governance Sub Group and Board of Directors. 
In-sourcing Update 
2.11. At the Audit and Scrutiny Panel meeting in March this year, members noted a series
of separate decisions taken by the council in recent years to insource, or cease
delivery, of a number of functions that had previously been provided through the
arm’s length bodies summarised below. 
Services /Functions ALEO / Delivery Vehicle Status
Cultural, leisure and
related services.
Culture and Leisure North
Lanarkshire Limited.
Services insourced and
delivered via Active and
Creative Communities
from 1 April 2021.
Functions inherited from
the former Cumbernauld
Development Corporation
in 1996 to redevelop
Cumbernauld town centre
through support for
business and enterprise
growth and promotion.
Campsies Centre
(Cumbernauld) Ltd
Company formally
dissolved and struck-off
from 21 June 2022.
Deposit banking savings
facility.
North Lanarkshire
Municipal Bank Ltd
Work underway to close
the Bank from 30
September 2022 and
thereafter wind-up and
dissolve the company as
per the council decision
on 27 October 2021. 
2.12. Members requested that an update on the status of each dissolution programme
should be provided at this meeting and the following additional information may be
helpful. 
Culture and Leisure North Lanarkshire Ltd 
2.12.1. Following service insourcing from 1 April 2021, the focus of activity shifted to
concentrate on winding-up the business and affairs of the predecessor providers
Culture and Leisure North Lanarkshire (CLNL) Ltd and North Lanarkshire Leisure
(NLL) Ltd1. 
CLNL Ltd and NLL Ltd’s statutory accounts for 2021/22 have been prepared and an
independent examination, reflecting the significantly reduced number of transactions 
1 Following the earlier decision by the council in September 2018 to integrate sports, leisure, recreational
activities and facilities within a single entity, with CultureNL Ltd retained as the single provider, and
subsequently renamed Culture and Leisure North Lanarkshire Limited to reflect responsibility for the wider
provision of services, the council as sole shareholder of North Lanarkshire Leisure Limited is also required to
wind-up the company and apply for dissolution and strike-off via Companies House.

Page 6

within each company, is due to take place in the late summer. CLNL Ltd is waiting on
confirmation of the de-registration of VAT and once this is confirmed, and the due
diligence work relating to the insurance claims (referenced below) is completed, the
striking -off process can begin. 
Further legal due diligence work required to be undertaken in respect of a small
number of insurance claims that remained outstanding. Dialogue with the legal
representatives acting on behalf of CLNL and NLL Ltd’s insurers is now at an
advanced stage and it is anticipated that the matter will be resolved in early course. 
In the meantime, the council has taken steps to assist in making the dissolution and
striking-off more straightforward and expedite the processes as timeously as possible
by passing and filing special resolutions to reduce and limit the directorships on each
company to a smaller number of representatives. 
Campsies Centre (Cumbernauld) Limited 
2.12.2. The transfer of net assets, liabilities and undertaking transferred to the council from
Campsies Centre (Cumbernauld) Ltd on 30 June 2021 and formal dissolution and
striking-off from the Register of Companies was confirmed by letter from Companies
House with effect from 21 June 2022 as noted above. 
North Lanarkshire Municipal Bank (NLMB) Limited 
2.12.3. Following the decision by NLMB’s Board of Directors, and subsequent ratification by
the Policy and Strategy Committee on 27 October 2021, to cease provision of a
municipal banking facility due to the substantial levels of investment that would be
required to ensure full compliance with significantly heightened anti-money laundering
and anti-financial crime safeguards introduced in recent years, work to close the Bank
with effect from 30 September 2022 is well underway. 
A Project Working Group comprising representatives from Legal and Democratic
Solutions, Financial Solutions and Corporate Communications is in place to manage
the closure and external specialist advice is being provided by a legal firm with
previous experience in advising another local authority on closing its municipal bank. 
Correspondence has been issued to all active account holders, where contact details
are available, advising them on the process to close their accounts and highlighting
the availability of alternative banking services in the local areas. Frequently Asked
Questions and regular updates are posted on the council’s website as part of a wider
Communications Plan which includes; follow-up letters to customers who have yet to
close their accounts; posters displayed in local offices, social media messaging; and
news releases published via national and local media outlets. 
Key risks and challenges, including making contact with as many customers as
possible; data protection safeguards; and ensuring that robust asset transfer
arrangements are in place to adequately safeguard any monies to be held in trust for
customers where it has not been possible to close their accounts by the 30
September 2022, have been identified. These are managed through the Project
Working Group with reporting via the Corporate Management Team.

Page 7

3. Measures of success 
3.1. The following measures of success are summarised for Panel members’
consideration: 
3.1.1. Arm’s length service delivery providers continue to deliver high quality public
services that achieve Best Value for the council. 
3.1.2. Effective and timely monitoring and reporting to relevant Service Committees
and this Panel provide assurance to the council that adequate governance,
financial and risk management procedures are operating effectively in each of
the ALEOs. 
3.1.3. Panel members have adequate assurance that the council is fulfilling its
‘Following the Public Pound’ obligations and the externalised service delivery
mechanisms are delivering services as per the council’s requirements and
expectations with minimal risk to the council, or effectively managing risks
where such are unavoidable. 
3.1.4. Appropriate, timely and robust project management arrangements are in place
to support the winding-up and subsequent dissolution of those ALEOs and
outside bodies where the council has taken the decision to in-source or cease
service delivery. 
4. Supporting documentation 
4.1. Appendix 1 - Summary of in-scope ALEOs and Joint Venture Partnerships
4.2. Appendix 2 -  Approved ALEO Liaison and Monitoring Arrangements
4.3. Appendix 3 - ALEOs’ Governance, Risk Management and Business Continuity
Summaries 
Katrina Hassell
Head of Business and Digital

Page 8

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact?
Financial governance matters within individual ALEOs which require close
monitoring by the respective Boards or Management Committees, along with further
monitoring and oversight by Financial Solutions are highlighted, by exception, at
paragraphs 2.8 to 2.10.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐

Page 9

5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
Individual ALEOs are responsible for maintaining their own risk management and
business continuity arrangements and ensuring these are regularly monitored with
effective controls and actions in place, plus mitigations to reduce the likelihood or
impact if a risk materialises. The information provided at Appendix 3 identifies the
top risks for each company and confirms that risk management and reporting
arrangements are in place. 
Separately, the council’s Business and Digital division has identified within its
Service Risk Register the potential for service delivery, financial, operational and
performance risks, or reputational damage to the council, if an externalised delivery
vehicle fails to provide services and operate to the standards expected and required
by the council. Controls and actions designed to minimise the potential risks
associated with service delivery via an arm’s length body are in place and include
the monitoring and oversight arrangements described in Appendix 2.

Page 10

Appendix 1
Summary of in-scope ALEOs and Strategic Partnerships
WHOLLY OWNED
ALEOs
OBJECTIVES / SERVICES
DELIVERED STATUS BOARD OF DIRECTORS
COMPOSITION  SERVICE COMMITTEE
Routes to Work
(RtW) Ltd 
Relief of poverty through
supporting individuals to secure
and sustain employment
Advance education and training,
particularly where this will lead to
paid employment.
Incorporated as a limited
company with charitable
status. Council is sole
shareholder (100%).
Maximum of up to 10 directors of
whom:
• Up to 2 are Category A Directors (1
elected member & 1 chief officer)
appointed by NLC;
• Up to 8 are Category B Directors
representative of local community or
possessing key skills/experience 
Enterprise, Growth and Fair Work
Committee
Fusion Assets Ltd  Physical regeneration and
infrastructure projects, focusing
in remediation of vacant &
derelict land where there is little
speculative development by the
private sector and/or market
failure.
Incorporated as a limited
company. Council is sole
shareholder (100%). 
Maximum of up to 8 directors of
whom:
• Up to 5 are Partner Directors (3
elected members & 2 chief officers)
appointed by NLC;
• Up to 3 are Co-opted Directors
possessing key skills/experience
Enterprise, Growth and Fair Work
Committee
North Lanarkshire
Properties LLP 
Management, marketing and
leasing of commercial property
portfolio that transferred from
NLC in 2013.
Provision of general lease
advice to NLC and management
of NLC’s retained commercial
properties (Legacy Estate).
Incorporated as a limited
liability partnership with 2
members:
NLC owns a 99.999%
shareholding and NL
Property Investments Ltd
holds a 0.001%
shareholding.
Maximum of 6 Management
Committee members:
• 5 representatives are appointed by
NLC (4 elected members and 1 chief
officer);
• 1 representative is appointed by NL
Property Investments Ltd
Finance and Resources
Committee 
NL Property
Investments Ltd 
To facilitate and support North
Lanarkshire Properties LLP 
Incorporated as a limited
company. Council is sole
shareholder (100%).
Maximum of 6 directors appointed by
NLC (5 elected members & 1 chief
officer being the same individuals as
those referenced above)
Finance and Resources
Committee (Limited separate
reporting requirement since
business is transacted through
the LLP above.)
North Lanarkshire
Municipal Bank
Limited 
Provision of deposit savings
account facility for individuals
and organisations 
Incorporated as a limited
company and defined as a
“municipal bank” under
Section 103 of the Banking
Act 1987. All serving
elected members of NLC
are shareholders, with an
individual share of £0.05. 
Maximum of 7 directors (all elected
members) appointed by NLC 
Policy and Strategy Committee
approved Bank’s closure and
dissolution of the company on 27
October 2021.

Page 11

STRATEGIC
PARTNERSHIP
VEHICLES
OBJECTIVES / SERVICES
DELIVERED
STATUS MANAGEMENT COMMITTEE
COMPOSITION 
SERVICE COMMITTEE
Amey Public
Services LLP 
Provision of roads, street lighting
and winter services contract
Incorporated as a limited
liability partnership with
Amey LG Ltd holding a
67% shareholding and NLC
holding a 33% shareholding
• 5 representatives with 3 appointed by
Amey LG Ltd and 2 appointed by
NLC (1 elected member and 1 chief
officer)
Environment and Place
Committee
MEARS Scotland
LLP 
Provision of housing and
corporate property repairs
Incorporated as a limited
liability partnership with
MEARS plc holding a 67%
shareholding and NLC
holding a 33% shareholding
• 5 representatives with 3 appointed by
MEARS plc and 2 appointed by NLC
(1 elected member and 1 chief
officer)
Housing Committee

Page 12

Appendix 2 
NORTH LANARKSHIRE COUNCIL: APPROVED ALEO LIAISON AND MONITORING
ARRANGEMENTS 
Although the ALEOs are separate bodies in their own right, responsible for service delivery and
governance, the council remains publicly accountable and has a duty to ensure that these organisations
are providing high quality, value for money services that meet service users and customers’
requirements and achieve best value for the council. The council fulfils its monitoring and assurance
obligations through a series of contractual, governance and public reporting mechanisms as described. 
1. Formal Service Level Agreements (SLAs) or Partnership Agreements between the council and
the individual company. These contractual agreements set out the services to be provided,
performance standards, monitoring obligations and the levels of funding, management fees or
rates where these are provided by the council. 
2. A nominated Client Officer is identified by the relevant service to ensure that service delivery
adheres to the contractual conditions referenced above, meets the council’s requirements and
expectations, and aligns with our strategic direction and The Plan for North Lanarkshire. 
3. As per the council’s Strategic Performance Framework, Heads of Service within the relevant
client service, submit a six-monthly performance report to the respective service committee.
These reports also provide information from the Head of Financial Solutions on the company’s
compliance with financial monitoring arrangements and financial performance including: 
• income and expenditure and comparison with budgeted forecast;
• balance sheet at reporting period end; and,
• projected cash flow - providing an assurance that the company can meet its liabilities and
trading commitments. 
4. The council appoints elected members and/or senior officers to serve on the relevant Boards of
Directors or Management Committees providing a further opportunity for oversight and strategic
alignment and ensuring that the council’s interests are reflected in company objectives and
business planning. 
5. Nominated Link Officers and Accountants from Business and Digital Solutions and Financial
Solutions respectively attend Board and Management Committee meetings and ensure that
governance, financial governance, risk management and business continuity arrangements are
in place and that the company is complying with its monitoring obligations. 
6. All ALEOs complete the annual Assurance Certificate and Checklist, with the findings
incorporated in the council’s annual governance statement published in the annual accounts. 
7. The council is also required by the Code of Practice on Local Authority Accounting to disclose its
interest in companies where it has a controlling influence or has the potential to exert ‘control or
influence’ through levels of funding or representation on the Board, when preparing its annual
statutory accounts. 
8. The Audit and Scrutiny Panel considers a six-monthly governance and assurance report from the
Head of Business and Digital. This composite report provides information submitted by each
ALEO on governance arrangements; significant developments; risk management (including
identification of the top five risks within the company) and assurances in relation to business
continuity. The report also includes information from the Head of Financial Solutions highlighting
any financial risks within an individual ALEO that have been identified by Financial Solutions
through their financial monitoring. This information describes any potential impact or risks to the
council including the potential impact on service delivery and/or trading operations.

Page 13

Appendix 3 
ALEOS’ GOVERNANCE, RISK MANAGEMENT AND BUSINESS CONTINUITY SUMMARIES 
Fusion Assets Ltd
Governance  - Board of Directors meeting scheduled for 16 May 2022 was rescheduled pending
appointment of council representatives and was subsequently held on 8 August 2022 with the
AGM scheduled for 7 November 2022. 
Summary of Impact of Covid-19 on Business and Recovery To Date – Fusion Assets
continues to operate in a “business as usual” manner from its new office in the Muirfield Centre,
Cumbernauld, on the basis of a hybrid working arrangement with staff spending on average three
days a week in the office.   
Overall, the industrial market continues to show high levels of demand, both from inward
investors and local companies, with very limited stock of buildings available. Following the
expected completion and sale in November 2022 of Plot A2 at Newhouse where a new facility is
being built for Co-op, Fusion Assets intend to start construction of its next development project
on the adjacent plot of land. Proposals are also being taken forward to establish a joint venture
company at Eurocentral and secure development finance for a 42,000 sqft multi-let industrial
scheme. Elsewhere the company continues to look to identify development opportunities and
market sectors that will contribute to the delivery of the Council’s Economic Recovery Plan.
Risk Management – Fusion Assets operates the Figtree Risk Management system that has
been adopted by the council with risks reviewed and updated on a regular basis. An additional
staff resource means that Fusion Assets is less vulnerable to the loss of key personnel, although
the company remains very small in terms of personnel and headcount.  Overall programme
delivery associated with annual funding awards remains a key risk area due to a number of
external factors including negotiations on site acquisitions with third parties, works contract
delays associated with obtaining statutory consents and co-ordination with utility companies.
Top 5 Risks
Programme
delivery
Contracts and
procurement
risks
Property
acquisition
Accessing
adequate
financial
resources
Grant availability
Business Continuity – There have been no business continuity issues over the last six months
with no illnesses or long-term absenteeism. With the recruitment of a Development Manager, the
company now has an additional senior staff resource to deputise for the Managing Director when
required.    
The company has successfully migrated its filing system over to Teams in line with the council’s
new corporate arrangements for data management, although there remain some slight issues with
formatting and Business and Digital Solutions are providing assistance.
Service Developments / Highlights – 
• Director Induction Packs have been prepared which include copies of the current Business
Plan and Corporate Governance Manual. Site visits will be organised in due course.
• Planned updating of Fusion’s Company Business Plan for 2022- 2024 will follow on from
consideration of a new Environmental, Social and Governance (ESG) Policy and Action Plan
at the August Board meeting. A new scheme of delegation is also scheduled to be
considered by the Board at the August meeting.

Page 14

North Lanarkshire Properties (NLP) LLP and North Lanarkshire Property (Investments) Ltd
Governance  - Following the scheduled Management Committee and Board meetings in
February this year, and a special meeting in April to consider a specific property matter where a
timeous decision was required, NLP’s next meeting will be on 1 September 2022 with indicative
dates in place for the remainder of this year and next year.
Summary of Impact of Covid-19 on Business and Recovery To Date – Hybrid working was
introduced in April 2022 and NLP employees are office based for a minimum of two days each
week.  The hybrid model works well for NLP as there is a natural requirement for a combination
of office and on site delivery associated with the majority of the roles. Continuity of service was
able to be maintained throughout Covid as a consequence of the business’s ability to deal with
transactions digitally and adopt new processes to complete contractual requirements where
necessary. 
NLP continues to align with the overall North Lanarkshire Council business model.  Future
investment is being considered in the forthcoming year for the outsourcing of the Uniform
database maintenance to the software designer IDOX which will alleviate the need for downtime
and business critical bottlenecks that can be associated with fault rectification.  This will support
the finance team and technical team in maintaining continuity in support of the rent roll, new
lease transactions and terminations and allay associated reputational damage associated with
system downtime.
Risk Management – NLP Management Committee considers an update report on the
company’s Risk Register at each meeting providing members with the opportunity to review
where the proximity or potential impact of any previously identified risks has heightened or been
further mitigated  in any way and to consider emerging new risks. Individual risks are organised
under five strategic risk categories noted below.
Top 5 Risks
IT Systems and
Software: Failure
of main reporting
and management
systems resulting
in failure to
collect rental
income
Business
continuity
management:
Staff resource
capacity and loss
of staff 
Planning and
Resources
(Financial):
Reduction in
income due to
pandemic and/or
cost of living
crisis
Planning and
Resources
(Strategic
Change): Failure
to align new
strategies to
change in market
conditions
Planning and
Resources
(Financial):
Inability to
service facility
agreement
Business Continuity – NLP’s operations have been robust throughout the pandemic and post
pandemic period and business aligns well with the hybrid working regime put in place.  Some
challenges have been experienced where the company is reliant on external partner
organisations who provide repairs services and monitoring and testing functions across the
property portfolio.  Issues are communicated via internal and external working groups and
managed accordingly where service is disrupted. 
NLP continue to support and manage the asset management function for NLC and NHS
Lanarkshire via the service level agreement vehicle.  Most issues are resolved via one on one
meetings or enquiries that are allocated across the Estates Team.  Regular meetings are held
between NLP, NHS and the company’s appointed facilities management partner where issues
are addressed as part of 360° action and feedback. 
Utility suppliers have caused some delay in project completion and re-letting of a small number of
properties where NLP is not in control of timescale for new supplies and metering installations. 
This is not something that can be controlled, however NLC Energy Assets are engaging on
NLP’s behalf as and when required to help resolve issues.
Service Developments / Highlights – 
• NLP’s existing Five Year Business Plan is under review and update with draft proposal
being prepared for 2023.
• Recruitment underway for two additional surveyors to backfill vacant posts.

Page 15

Routes to Work (RtW) Ltd
Governance  - Board meetings took place on 15 March and 23 June 2022 as scheduled with
further quarterly meetings scheduled for the remainder of this year including the Annual General
Meeting on 22 September 2022. 
The Finance Sub Group meets monthly and the separate Governance and HR Sub-Groups
continue to meet quarterly with special meetings convened as required. (For example two special
meetings of the HR Sub Group were held over the summer to consider and subsequently
recommend that fixed-term contracts of employment for staff due to leave RtW on 30 June this
year should be extended to 30 September 2022 to support the wider management and staffing
review/restructure exercise. A small number of points of detail arising from this review were also
the subject of separate consideration and finalisation by the HR Sub Group at a further special
meeting in advance of engagement and dialogue via the Employee Forum and  a full staff
briefing event held on 19th July 2022. 
Summary of Impact of Covid-19 on Business and Recovery To Date – RtW staff returned to
hybrid working (2 days in the office / 3 days at home for FTEs and pro rata for part time staff)
from Monday 7th February 2022, following a short period of full homeworking due to the Omicron
variant and pressure on NHS Services. This was reviewed at the end of February and from 21st
March 2022, RtW increased the days in the office to a 3:2 ratio (3 days in the office and 2 days at
home). 
This was reviewed again in April and restrictions were further relaxed enabling RtW to return to
client facing activity. From 19 April 2022, client appointments in the offices were reintroduced and
RtW made preparations to resume community based appointments with clients. This planned
return to ‘business as usual’ was successful and at the beginning of June RtW moved to
a 4:1 office / home working pattern (for FTEs and pro rata for part time staff). 
RtW have recently reviewed the impact of these hybrid working arrangements and the potential
to implement a more permanent hybrid working model, consulting widely with staff, clients and
partners. The findings were discussed by the Board with the outcome of the service delivery
model review and a blended model of delivery, along with some specific recommendations for
particular service user cohorts, being identified as the most preferred model. The recommended
actions arising from this exercise will be carried out from October 2022 onwards.   
Risk Management – The Risk Register is reviewed quarterly by Senior Management Team and
discussed at the Governance Sub Group quarterly meeting. A Risk Management update report is
submitted at each Board meeting. This identifies any new risks and outlines where the impact of
a potential risk is considered to have heightened in terms of severity or proximity. The Risk
Management report also confirms where the impact of a potential risk is considered to have
become less of a threat, including the point at which the risk is deemed to be sufficiently
manageable or insignificant and may be removed from the Risk Register. Risks are assessed
using a Red, Amber and Green (RAG) methodology. The Risk Register had a full review in April
2022 in line with the new operational year, the top 5 risks were identified as the following:
Top 5 Risks
Under-
performance on
key contracts
Failure to secure
funding via UK
Shared
Prosperity Fund
Failure to deliver
on new
Community
Regeneration
Fund Project
Unsuccessful
transition to new
delivery model
Breach of
information
security
Business Continuity - 
• Business Continuity Policy and a Business Continuity Plan in place.
• Interim Working from Home Policy introduced in 2021 is due to be replaced with Hybrid
Working Policy as described above.

Page 16

• Staff shortages, as a result of staff leaving RtW due to the prevalence of short term,
temporary contracts linked to funding commitments and an inability to backfill, due to the
current labour market and the short contract length, continue to present the greatest
business continuity challenges. 
• A recent rise in sickness levels, potentially as a result of increased numbers in offices and
general closer mixing of people both at work and in leisure, is being closely monitored. While
figures remain generally within the target overall 97% attendance rate, the trajectory is
worsening and RtW will conduct a deep dive if this continues to identify any additional
measures required beyond the charity’s usual absence management processes.
Service Developments / Highlights – 
• Business Plan annual review completed in March this year to identify objectives for inclusion
in the 2022/23 annual operational plan. The Operational Plan, as approved by the Board in
June this year consists of 8 Action Areas with 49 Tasks and Activities supported and
demonstrated through 145 progress indicators. The Plan will be reviewed quarterly through
the Governance Sub-Group with update reports provided at each Board meeting.
• In line with RtW’s Strategic Business Plan objectives, a revised core management and
staffing structure was approved by the Board at its meeting in June.  The revised structure
reflects current operational commitments; increasing corporate governance commitments
and obligations; growth and development ambitions; Knowledge Transfer Partnership (KTP)
workplans; and considers current and future management and leadership capacity and work
distribution issues to ensure, as far as possible, that RtW is future-proofed for the remaining
period of the business plan.  The structure anticipates that revenues will continue to remain
at recently increased levels, significantly reducing the necessity to employ staff on fixed-term
contracts through the creation of 15.1 Full Time Equivalent new permanent posts, taking the
permanent headcount to 71.3 FTEs.  An external and internal recruitment campaign will
commence in early August with the aim of having staff in place by 30 September to coincide
with the revised end date of the majority of fixed term contracts currently in place.
• RtW has recently secured a place on the Scotland Excel Framework for delivery of
commissioned services under the No One Left Behind umbrella across Scotland.  The
framework covers all 32 local authority areas and provides a directory of approved providers
which individual Local Authorities can choose to call-off service provision from using a mini-
competition process.  RtW has been successful in gaining a place on the 12 Glasgow City
Region authorities’ frameworks, plus other geographically linked authorities and anticipates
taking this forward as part of the charity’s growth and development ambitions.
• 20,000 service user celebration event held on 17 June 2022 and attended by elected
members, partners, service users, employer, colleges and training providers. 
Amey Public Services (APS) LLP
Governance  - Management Committee met on 24 June 2022 with further quarterly meetings
scheduled for the 9 September and 9 December 2022. 
APS Senior Management Team meets with senior managers from Environmental Assets on a
monthly basis at the Roads, Street Lighting and Winter Service Client Liaison meetings. The
standing agenda includes: Contract Performance Management (including review of Performance
Indicators); Financial Management; Health and Safety; Operational Service Delivery; Winter
Services; and any issues escalated from other sector meetings between the council and APS. 
APS continues to work closely with the council at all levels to maintain consistency of service
delivery and flag / discuss / resolve issues at the most appropriate level. Any matters which are
not resolved are escalated to management as appropriate.
Summary of Impact of Covid-19 on Business and Recovery To Date – APS continues to
deliver services on a ‘business as usual’ basis and in line with Scottish Government and Amey’s
own Covid work restrictions and safeguards. The company has recently removed some
restrictions and is moving towards to a “Living with Covid strategy”, however, Amey remains

Page 17

vigilant to the impact that Covid could have on working practices and operational delivery and
good practices remain in place. 
Hybrid working is  available for office-based staff as appropriate, and the council liaison meetings
referenced above continue to be undertaken via TEAMS. 
APS continues to monitor Covid sickness absences, and these have been relatively small in
number with little to no impact on service delivery. This is due to the positive behaviours of
employees both in the work and non-work environment and continual monitoring of individuals’
wellbeing.
Risk Management – Although the APS Contract has not been impacted by any significant issues
to date, the conflict in Ukraine, hyperinflation and the lag from exiting Covid is monitored
constantly to keep all parties aware at an early stage of any impacts which could affect the
contract stability. There have been no changes to existing risks on the APS Contract since the
previous report and risk management is discussed at appropriate forums with the council and at
Management Committee meetings.
Top 4 Risks
Insufficient revenue
and capital budgets
from the council to
maintain APS
resource levels,
productivity and
utilisation
Continued pressures
from labour market
(e.g. house builders,
competitors) attracting
operational staff away
from APS with higher
wages
Need for
increased levels
of third-party work
to offset any NLC
budget
constraints
Hyperinflation and changes
in law have seen a
wholesale increase on
material costs. These
increases have not been
fully covered off by the
contract indexation
Business Continuity - There have not been any impacts on service delivery or business
continuity over the last six months from Covid. 
APS continues to keep its Business Continuity Plan and other risk assessments under review on
an ongoing basis to reflect current guidance both from Scottish Government and Amey Group
and HSEQ team.
Service Developments / Highlights – 
• APS and the council are working in partnership to submit a tender for the Department for
Transport and ADEPT Live Labs2 initiative which aims to support the creation / maintenance
of Net Zero highways and local roads. The programme targets innovation in working towards
carbon Net Zero and improving environmental impacts.  A series of joint “Net Carbon Zero” 
workshops have been held to present and identify the key issues in zero carbon that should
be addressed through the bid along with a process to enable identification of solutions. 
Mears (Scotland) LLP
Governance  - Mears Management Committee meeting scheduled for 31 May 2022 was
postponed pending the appointment of council representatives. The operational and financial
performance for Quarterly Monitoring Periods 1 and 2 (1 January to 30 June) were subsequently
considered at the meeting on 23 August 2023. 
Mears engages with the Client Monitoring Officer from Housing Property and Projects through
the quarterly governance meetings along with wider engagement and collaborative working
through:
• 4 Weekly Liaison Meetings with the council’s Repairs and Maintenance Manager;
• SIP (Service Improvement Groups);
• Finance Liaison Meetings (Monthly); and, 
• Customer Success Improvement Group.

Page 18

Summary of Impact of Covid-19 on Business and Recovery To Date – Mears’s operating
model has returned to ‘business as usual’ and the company continues to work in partnership with
the council to deliver all services within the Contract. 
All staff have now returned to the office on a full-time basis. All digital infrastructure and
technology remains in place however, to ensure that in the event of an emergency, all staff have
the correct kit and security protocols to allow a swift and seamless transition to home working. 
Health and Safety remains centric to Mears’s operating model and as such, the decision was
taken to continue to work to the approved Covid risk assessments and procedures to ensure a
safe working environment for our staff and to protect the wellbeing of tenants and residents in the
local communities.
Risk Management – Risks are monitored with controls in place to reduce the likelihood of
occurrence and mitigate the potential impact.
Top 5 Risks
Potential
Health and
Safety
breaches
through failing
to adhere to
additional
Covid
practices 
Resource
Supply
(Attracting and
retaining
qualified
employees);
Supply and
pricing of
materials; and
sub-contractors.
Partnership finance
following cessation of the
defined service
agreement and impacted
by: Continued Covid
safety operating; change
in sales mix from higher
margin larger capital
works to lower margin
repeat work; and supply
and pricing of materials.
GDPR- Failure
to comply with
Data Protection
requirements in
line with
regulations
updated in May
2018.   
Requirement
to ensure 
that Mears’s 
T&Cs and
pay rates
remain
competitive
/comparable
to the labour
market.
Business Continuity – Business Community Plan updated in March 2022 to reflect Mears’s
newly implemented structure, and key personnel to engage with depending on nature of the
event or incident. 
Mears are able to respond quickly to any incident which limits access to office space as
demonstrated by adapting to home working during the pandemic. All systems are accessible
remotely and data protected through our remote desktop Virtual Private Networks.
Service Developments / Highlights – 
• Mears has been selected as the delivery partner on behalf of North Lanarkshire Council to
refurbish tower blocks that had been earmarked for demolition, to provide homes for
Ukrainian refugees. Mears are now on site to refurbish 200 homes within Birkshaw and High
Coats Towers.
• Mears are working alongside the council’s Business and Digital division on the development
and implementation of the new job scheduling and planning tool, Microsoft Field Services,
which is due to be rolled out in August 2022.