Clerk Name: Clare Louise McDonald
Clerk Telephone: 07350 435308
Clerk Email: committee@northlan.gov.uk
17 June 2025
Members of the
Audit and Scrutiny Panel
Chief Executive’s Office
Rachel Blair
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk
Notice is given that a Special Meeting of the Audit and Scrutiny Panel is to be held in the
Committee Room 1, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on Thursday, 26
June 2025 at 14:00 PM which you are requested to attend.
The agenda of business is attached.
Rachel Blair
Chief Officer (Legal & Democratic)
Members :
S Watson, P Kelly, C Costello, A Duffy-Lawson, M Hughes, J Hume, D Johnston, J Leckie,
M McCulloch, J McLaren, G Robinson.
Page 1 of 108

Page 2

Page 2 of 108

Page 3

Agenda
1 Declarations of Interest In Terms of the Ethical Standards
In Public Life Etc. (Scotland) Act 2000
YEAR-END ITEMS
2 Internal Audit Annual Report 2024-25
Submit report by the Chief Officer (Audit and Risk) informing
that the Public Sector Internal Audit Standards and the
Council's Internal Audit Charter require the Chief Officer
(Audit and Risk) to provide the Audit and Scrutiny Panel, the
Chief Executive and Corporate Management Team, with an
annual summary of the work undertaken by Internal Audit,
and to provide an annual independent opinion on the
Council's corporate governance, risk management and
internal control arrangements.
5 - 20
3 Strategic Governance Framework - Annual Review and
Refresh
Submit report by the Chief Officer (Strategy and Engagement)
regarding the annual review which has been undertaken to
refresh the Strategic Governance Framework and to ensure
each of the elements and mechanisms listed within the report
are up-to-date, and on a review programme to be updated at
an appropriate interval and reported to the relevant
Committee.
21 - 76
4 Annual Governance Statement 2024-25
Submit report by the Chief Officer (Strategy and Engagement)
providing the Panel with a copy of the Annual Governance
Statement for consideration.
77 -
108
5 Unaudited Annual Accounts for the year ending 31 March
2025
Submit report by Chief Officer (Finance and Technology)
(copy to follow)
Page 3 of 108

Page 4

Page 4 of 108

Page 5

North Lanarkshire Council
Report
Audit and Scrutiny Panel 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    FS/ASP/June2025 Date 26/06/25 
Internal Audit Annual Report 2024-25 
From  Francis Scott, Chief Officer (Audit and Risk)  
E-mail scottfr@northlan.gov.uk Telephone 07887 914207 
Executive Summary
The Public Sector Internal Audit Standards (PSAIS) and the Council’s Internal Audit
Charter require the Chief Officer (Audit and Risk) to provide the Audit and Scrutiny Panel
with an annual summary of the work undertaken by Internal Audit and to provide an
independent opinion on the Council’s corporate governance, risk management and internal
control arrangements.  This report fulfils that requirement for the year 2024-25. 
The annual opinion is unqualified and states that reasonable assurance can be placed
on the Council’s governance, risk management and internal control arrangements. 
This report has previously been submitted to the Chief Executive, Business Management
Team and Corporate Management Team. 
Recommendations
The Panel is invited to: 
(1) note the Internal Audit Annual Report 2024-25 and the associated annual opinion
of the Chief Officer (Audit and Risk); and 
(2) consider whether there are any issues arising on which the Panel wishes to request
further reports from Internal Audit and/or relevant management. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work All Programmes of Work
Item 2
Page 5 of 108

Page 6

1. Background 
1.1 Internal Audit is an independent, objective assurance and advisory function designed
to add value and improve the Council’s operations.  It helps the Council accomplish its
objectives by bringing a systematic, disciplined approach to evaluating and improving
the effectiveness of the Council’s risk management, internal control and governance
processes. 
1.2 Internal Audit’s primary objectives are: 
• To examine and evaluate internal control systems and governance arrangements
within the Council.
• To provide assurance to elected members and senior officers on the adequacy and
robustness of these systems.
• To assist the Audit and Scrutiny Panel (the Panel), elected members and officers of
the Council in the effective discharge of their responsibilities. 
1.3 Internal Audit aims to provide a high quality and customer focused service which is
responsive and flexible, consistent with best professional practice, focuses on areas
that matter, uses resources efficiently and effectively, and is seen by stakeholders as
adding value and making a vibrant and relevant contribution to the Council. 
1.4 The purpose, mandate, authority and responsibilities of the Council’s Internal Audit
function are outlined in the Internal Audit Charter, the most recent version of which was
approved by the Panel in May 2025. 
1.5 Internal Audit reports its outputs regularly throughout the year to the Panel in accordance
with the Internal Audit Charter.  The Panel also approves Internal Audit’s annual audit
plan and monitors the performance of the function. 
1.6 Internal Audit activity is planned to enable the Chief Officer (Audit and Risk) to provide
an independent annual opinion on the adequacy and effectiveness of internal controls
within the authority, including the systems designed to achieve the corporate objectives
of the Council and those that manage the material risks faced by the authority. 
1.7 It should be noted that the presence of an effective Internal Audit function contributes
towards, but is not a substitute for, effective control.  It is primarily the responsibility of
management to establish internal controls so that the Council’s activities are conducted
in an efficient and well-ordered manner, to ensure that management policies and
directives are adhered to, and that assets and records are safeguarded. 
2. Report 
Internal Audit Team 
2.1 The Internal Audit team has an establishment of 8.5 full-time equivalent (FTE) members
of staff, comprising a Chief Officer, an Audit Manager, six Auditors and an Audit and
Risk Assistant.  All members of the team above assistant level hold, or are working
towards, a relevant professional qualification. 
2.2 The Chief Officer (Audit and Risk) reports directly to the Chief Executive and is a
member of the Council’s Corporate Management Team.  The role and status of the
Chief Officer and the Internal Audit function within the Council is consistent with the
requirements of the Public Sector Internal Audit Standards (PSIAS) and best practice. 
2.3 The team experienced a number of significant staffing changes during 2024-25, with
the Chief Officer and Audit Manager positions being subject to recruitment, and interim
Page 6 of 108

Page 7

management arrangements being put in place until these positions were filled
permanently.  These arrangements had the overall effect of the team operating with
one vacant post during year, resulting in some changes to the implementation of the
audit plan. 
2.4 A performance management framework for Internal Audit was implemented in 2021.
Results of the key performance indicators are reported on an annual basis, and
Appendix 3 sets out these results for 2024-25.  These indicators will be subject to
review during 2025-26, with any revised framework being presented to the Panel. 
Customer satisfaction surveys are issued to service management at the conclusion of
each audit, with the results being reported to each meeting of the Panel.  During 2024-
25, the team continued to receive positive feedback from Services for the work
undertaken. 
2.5 The team continues to foster effective working relationships with colleagues from other
organisations.  The Chief Officer (Audit and Risk) is a member of the CIPFA Internal
Audit Special Interest Group and the Scottish Local Authorities Chief Internal Auditors’
Group (SLACIAG).  Additionally, members of the team attend and contribute to
SLACIAG’s sub-groups covering computer audit, data analytics and counter fraud. 
These are valuable forums through which best practice and intelligence is shared, and
relevant training provided.   
2.6 Joint working is also undertaken with the appointed Chief Internal Auditor for NHS
Lanarkshire, for the provision of a joint internal audit service to North Lanarkshire
Integrated Joint Board.  Internal Audit staff also continue to liaise closely with Audit
Scotland, the Council’s appointed external auditors, to facilitate their work and to avoid
any potential duplication of effort. 
Public Sector Internal Audit Standards 
2.7 Since their introduction in 2013, the Public Sector Internal Audit Standards (PSIAS)
have been mandatory for Internal Audit functions.  To ensure compliance with the
PSIAS, the Chief Officer (Audit and Risk) is required to develop and maintain a Quality
Assurance and Improvement Programme (QAIP) which includes periodic internal
assessments, and an independent External Quality Assessment (EQA) to be
undertaken at least every five years. 
2.8 During 2024-25, internal monitoring and assessment confirmed that Internal Audit
continued to operate in accordance with the PSIAS.  The most recent independent EQA
was undertaken by Stirling Council in 2024 and confirmed that Internal Audit fully
conformed with the PSIAS.  This was reported to the Panel in May 2024.  Both the self-
assessment and EQA highlighted some areas for improvement and consideration, and
these are highlighted in the QAIP action plan at Appendix 4. 
2.9 From April 2025, the PSIAS was replaced by the Global Internal Audit Standards
(GIAS).  The introduction of the GIAS will require a revision to the current internal audit
methodology and working practices, and a gap analysis exercise is currently being
undertaken to determine the actions to be taken to ensure compliance.  Similar to the
PSIAS, compliance with the GIAS will also be subject to ongoing internal review and
periodic self-assessment.  The GIAS also require an EQA on a five-yearly basis, with
the next assessment due to be undertaken in 2028-29. 
Internal Audit Activity During 2024-25 
2.10 The Internal Audit plan for 2024-25 was approved by the Panel in May 2024.  During
the year, 17 audit assignments were undertaken from the plan resulting in the following
assurance opinions.
Page 7 of 108

Page 8

Substantial
Assurance
Reasonable
Assurance
Limited
Assurance No Assurance Other/TBC *
5 7 1 0 4
*  One audit was an extended follow-up with no assurance opinion.  The remaining 3 audit
reports have not yet been finalised, but the completed fieldwork indicates that they will provide
Reasonable Assurance 
2.11 In addition, unplanned assignments were undertaken during the year.  This included
an assurance audit on Council Tax Refunds (which provided Reasonable Assurance),
a school fund review and two advisory reviews for Fleet Services and Land Services. 
In addition, an investigation was undertaken relating to an alleged school fund fraud –
this is discussed in more detail at paragraph 2.21.  Appendix 2 provides details of the
planned and unplanned work undertaken during 2024-25. 
2.12 The PSIAS require the audit plan to be subject to ongoing review to ensure it remains
relevant and fit for purpose.  During the year, some amendments were made to the
plan to enable the function to respond flexibly to changing circumstances, and to take
account of the effect of interim management arrangements and vacancies within the
team. These changes were approved by the Panel in February 2025, and included: 
Audit Reason for Change
Risk Management Deferred to 2025-26 due to resources
Roads Contract Deferred to 2025-26 due to delayed start to contract
Strategic Governance
Arrangements
Work started in 2024-25 but due for completion in 2025-26 due
to resources
Information Governance Deferred to 2025-26 due to resources
Contract Management Deferred to 2025-26 due to introduction of revised contract
management arrangements
Review of Anti-Fraud
Arrangements
Deferred to 2025-26 due to resources
Assurance Mapping Deferred to 2025-26 due to resources
Future Operating Model Removed from plan, as no longer classed as a corporate risk
(some elements included within strategic governance audit) 
2.13 Taking into account these changes to the audit plan and the additional unplanned work
undertaken during the year, it is my view that sufficient coverage has been obtained to
inform the annual opinion. 
2.14 Internal Audit continues to support Service management to ensure recommendations
made within audit reports are implemented as agreed, and an update on all outstanding
audit recommendations is presented to each meeting of the Panel.  The Internal Audit
Annual Report for 2023-24 noted a marked improvement in the actions and
engagement of management in implementing audit recommendations, and this has
continued throughout 2024-25. 
Page 8 of 108

Page 9

2.15 Internal Audit also has responsibility for investigating alleged frauds and irregularities
brought to our attention in accordance with the Council’s Counter Fraud Policy.  Where
detailed work is carried out, the findings are reported to the Chief Executive and the
relevant Chief Officer, with details of the work presented to the Panel, in line with the
Internal Audit Charter. 
2.16 In addition to undertaking audit reviews, the Internal Audit team are involved in a
number of other areas which serve to contribute to good governance across the council
and enhance the overall control environment. During 2024-25, this included: 
• Participation in corporate working groups, project boards and Programme of Work
thematic boards.
• Provision of advice and guidance on systems development and control issues to
services and Chief Officers.
• Preparation of reports and agendas, and participation at meetings, to enable the
Panel to fulfil its role. 
• Co-ordinating the work of the Council’s involvement with the National Fraud
Initiative.
• Consideration of reports by Audit Scotland and the Accounts Commission and
highlighting key issues. 
Audit Issues 2024-25 
2.17 The nature of audit assignments is such that most Internal Audit reports identify some
weaknesses or areas where scope for improvement exists, and during 2024-25, a
number of recommendations were made to address such areas identified from the audit
work undertaken.  However, as noted in paragraph 2.10, the vast majority of audits
undertaken during the year received opinions of either Reasonable or Substantial
Assurance, and there are no issues arising from these audits which require to be
highlighted in this report. 
2.18 The 2023-24 Annual Report discussed reports on the Housing and Corporate Property
Maintenance Contract and the whistleblowing allegations received by Audit Scotland,
which resulted in a number of high priority recommendations for management to
address.  Audit work during 2024-25 concluded that significant progress had been made
in implementing the recommendations in both reports, with some aspects being fully
implemented.  Internal Audit will continue to monitor progress with the remaining
recommendations, and further substantive audit work on the operation of the new
contract arrangements is planned for 2025-26. 
2.19 One audit during 2024-25 provided Limited Assurance, and this was in relation to
arrangements for managing school funds.   The control environment around school
funds has been subject of repeated audit activity regarding anomalies and
discrepancies, and this audit highlighted that previously agreed control measures had
not been fully implemented.  Following this audit, an unplanned review was undertaken
to review a potential school fund discrepancy.  Although on this occasion, no financial
loss or misappropriation was discovered, the audit highlighted a number of weaknesses
in the recording, reconciling and banking of school fund income and expenditure. 
2.20 In response to this work, Education senior management presented a report to the Panel
in February 2025, detailing actions taken to address the weaknesses identified and
additional measures to further enhance the control environment.  Progress with these
actions will be monitored by Internal Audit. 
2.21 One fraud investigation was undertaken during 2024-25. This also related to school
funds and involved a report of missing monies.  During the investigation, a member of
staff confessed to taking funds on several occasions for personal use, and the audit
Page 9 of 108

Page 10

work concluded that there was clear evidence that fraud had been committed.  
Appropriate action was taken under the Council’s Discipline Policy and the member of
staff involved resigned prior to the disciplinary hearing.  In line with the Council's
Corporate Fraud Policy, this matter was referred to Police Scotland for further
consideration, and details of the fraud were also reported to Audit Scotland.   
2.22 Although the issues noted above can be significant to the control environment in the
individual system or areas audited, they are not material enough to have a significant
impact on my overall opinion on the adequacy of the Council’s control environment. 
Internal Audit Opinion 2024-25 
2.23 The opinion is presented to members of the Audit and Scrutiny Panel, the Chief
Executive and the other members of the Council’s Corporate Management Team and
is intended to provide independent and objective assurance as to the adequacy and
effectiveness of governance, internal control and risk management arrangements within
the Council. 
Annual
Opinion
Reasonable
Assurance
There is generally an overall sound system of governance,
risk management and internal control in place.  While some
issues, non-compliance or scope for improvement were
identified, individually these do not significantly impair the
Council’s system of internal control. 
2.24 My formal Internal Audit Opinion on the soundness of the Council’s internal control
systems for 2024-25 is presented at Appendix 1.   
Acknowledgements 
2.25 I would like to take this opportunity to express my thanks to all staff in the Audit and Risk
team for their hard work and commitment throughout the past year.  I would also like to
thank all Council staff who have assisted Internal Audit during our work throughout
2024-25, and the Chief Officers and elected members for the consideration and due
regard given to our work. 
3. Measures of success 
3.1  Internal Audit reports annually on its performance to the Panel and is also subject to
review annually by the Council’s appointed external auditors.   
4. Supporting documentation 
Appendix 1 Internal Audit Opinion 2024-25
Appendix 2 Audit Work Undertaken 2024-25
Appendix 3 Internal Audit Performance  
Appendix 4  Quality Assurance Improvement Programme (QAIP) Action Plan 
Francis Scott
Chief Officer (Audit and Risk)  Page 10 of 108

Page 11

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Page 11 of 108

Page 12

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Failure to operate an effective Internal Audit function, consistent with the Public
Sector Internal Audit Standards (PSIAS) could impair the Council’s compliance with
its Code of Corporate Governance.  Risks to the effective operation of the Internal
Audit service (including failure to comply with PSIAS) and how these are mitigated
are documented in the Service’s risk register which is subject to regular review by
the Audit and Risk management team. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 12 of 108

Page 13

APPENDIX 1 – Internal Audit Opinion 2024-25 
To the members of North Lanarkshire Council’s Audit and Scrutiny Panel, the Chief
Executive and Corporate Management Team 
As Chief Officer (Audit and Risk) of North Lanarkshire Council, I am pleased to present my
annual statement on the adequacy and effectiveness of the Council’s framework of
governance, risk management and internal control for the year ended 31 March 2025. 
Respective responsibilities of management and internal auditors in relation to
governance, risk management and internal control 
It is the responsibility of the Council’s senior management to establish appropriate and sound
systems of governance, risk management and internal control and to monitor the continuing
effectiveness of those systems.  It is the responsibility of the Chief Officer (Audit and Risk) to
provide an independent annual opinion on the adequacy and effectiveness of the Council’s
framework of governance, risk management and internal control. 
The Council’s framework of governance, risk management and internal controls 
The main objectives of the Council’s framework of governance, risk management and internal
controls are to ensure that resources are directed in accordance with agreed plans, policies
and priorities and to ensure that there is sound decision-making and clear accountability for
the use of those resources in order to achieve the desired outcomes for service users and
communities. 
This includes ensuring that appropriate internal controls and risk management arrangements
are in place to effectively manage issues which might impact on the delivery of Council
services, the achievement of corporate and service objectives, ambitions and priorities and
public confidence in the Council.  The Council also requires effective internal controls and risk
management arrangements to safeguard its employees, to protect its assets, to maintain
effective stewardship of public funds, to ensure good corporate governance, to ensure
compliance with statutory requirements and to ensure it continues to deliver best value. 
The work of Internal Audit 
Internal Audit is an independent, risk-based and objective assurance function designed to add
value and to improve the Council’s operations.  It enhances the Council’s achievement of its
objectives, decision making and oversight by bringing a systematic approach to evaluate and
improve the effectiveness of the Council’s risk management, control and governance
processes and by providing an independent and objective opinion on the Council’s internal
control environment.  In doing so, Internal Audit contributes to the Council’s reputation and
credibility with its stakeholders and its ability to serve the public interest.   
Internal Audit operated throughout 2024-25 in accordance with the Public Sector Internal Audit
Standards (PSIAS).  As part of the Internal Audit Quality Assurance and Improvement
Programme, I have assessed the extent to which current internal audit activity, policies and
procedures conform to expected requirements.  The results show that Internal Audit continues
to substantively comply with the PSIAS. 
Internal Audit undertakes an annual programme of work formally approved by the Audit and
Scrutiny Panel.  The audit plan is determined following a risk-based audit needs assessment
that is revised on an ongoing basis to reflect my assessment of the evolving risks and changes
within the Council. 
All Internal Audit reports identifying system weaknesses or non-compliance with expected
controls are brought to the attention of management and include appropriate recommendations Page 13 of 108

Page 14

and agreed action plans.  It is management’s responsibility to ensure that proper consideration
is given to Internal Audit reports, and that appropriate action is taken on audit
recommendations. 
Internal Audit is required to ensure that appropriate arrangements are made to determine
whether action has been taken on Internal Audit recommendations or, where appropriate, that
management has understood and assumed the risk of not acting.  Significant matters (including
non-compliance with audit recommendations) arising from internal audit work are reported
regularly to the Chief Executive, to the Corporate Management Team and to the Audit and
Scrutiny Panel. 
Basis of Opinion 
My evaluation of the control environment is informed by several sources: 
• The audit work undertaken by Internal Audit during the year to 31 March 2025.
• The assessment of risk completed during the preparation of the 2024-25 and 2025-26
Internal Audit plans.
• My wider knowledge of the Council’s corporate governance, risk management and
performance management arrangements.
• Assurances of the general control environment within individual Services in 2024-25
provided by Chief Officers.
• Reports issued by the Council’s external auditors during 2024-25, together with reports
from other external review and inspection bodies. 
Opinion 
It is my opinion that reasonable assurance can be placed upon the adequacy and effectiveness
of the Council’s framework of governance, risk management and internal control for the year
ended 31 March 2025. 
Francis Scott
Chief Officer (Audit and Risk)
North Lanarkshire Council 
May 2025
Page 14 of 108

Page 15

APPENDIX 2 – Audit Work Undertaken 2024-25
Audit  Status Recommendation Priority Assurance Opinion Reported to Audit &
Scrutiny Panel High Medium Low
Planned 
1. Corporate governance Ongoing     Expected August 2025
2. Performance management Complete 1 1 0 Reasonable May 2025
3. Business continuity planning Complete 0 3 1 Reasonable May 2025
4. Housing & Corporate Property Maintenance Contract  Complete    No Opinion May 2025
5. Cyber Security Ongoing     Expected August 2025
6. Housing Asset Management Plan Complete 0 0 1 Substantial February 2025
7. Social Work Quality Assurance  Complete 0 4 1 Reasonable October 2024
8. UK Shared Prosperity Fund Complete 0 0 1 Substantial May 2025
9. City Deal Complete 0 0 2 Substantial February 2025
10. Devolved School Management Complete 1 3 1 Reasonable February 2025
11. School Funds Complete 1 1 1 Limited October 2024
12. Project Management Quality Assurance Complete 0 1 1 Reasonable May 2025
13. Payroll  Ongoing     Expected August 2025
14. Use of Purchase Cards Complete 0 2 2 Reasonable February 2025
15. Housing Rents Complete 0 1 0 Substantial February 2025
16. Non-Domestic Rates  Complete 0 0 2 Substantial May 2025
17. Scottish Welfare Fund Complete 1 2 2 Reasonable October 2024
Unplanned
18. Council Tax Refunds Complete 0 1 0 Reasonable October 2024
19. School H – School Fund Review Complete    N/a February 2025
20. School I – School Fund Investigation Complete    N/a February 2025
21. Fleet Services – Advisory Complete    N/a N/a
22. Land Services Recruitment – Advisory Complete    N/a N/a Page 15 of 108

Page 16

Assurance Opinion Definitions
Substantial Assurance A sound system of governance, risk management and control exists, with internal controls operating effectively and being
consistently applied to support the achievement of objectives in the area audited.
Reasonable Assurance There is a generally sound system of governance, risk management and control in place. Some issues, non-compliance or scope
for improvement were identified which may put at risk the achievement of objectives in the area audited.
Limited Assurance Significant gaps, weaknesses or non-compliance were identified. Improvement is required to the system of governance, risk
management and control to effectively manage risks to the achievement of objectives in the area audited.
No Assurance Immediate action is required to address fundamental gaps, weaknesses or non-compliance identified. The system of governance,
risk management and control is inadequate to effectively manage risks to the achievement of objectives in the area audited. 
Page 16 of 108

Page 17

APPENDIX 3 – Internal Audit Performance
Category Measure 2024-25 Performance 2023-24 Performance
1. Delivery of Annual
Plan  Percentage completion of agreed plan 87.9% 88.3%
2. Targeting
Percentage of key corporate risks and key financial
systems over which assurance provided (note 100%
coverage planned over a 3-year rolling period)
Corporate risks – 27% audited in
2024-25
Financial systems – 42% audited
in 2024-25
Corporate risks – 20% audited in
2023-24
Financial systems – 45% audited
in 2023-24
3. Efficiency Cost of Internal Audit per £ million revenue budget To be confirmed To be confirmed
4. Efficiency % of productive hours delivered v Plan 89.8% 92.6%
5. Delivery /
recommendations
Percentage implementation of agreed actions by
implementation date (cumulative year to date) 54% 49%
6. Delivery / other Number of significant irregularity / fraud
investigations 1 5
7. Quality / standards Reliance placed by External Audit on the work of
Internal Audit No Yes
8. Quality / standards Quality review outcomes – EQA or internal self-
evaluation
2024 EQA ‘Fully Conforming’ with
PSIAS
2024 EQA ‘Fully Conforming’ with
PSIAS
9. Delivery of Annual
Report Annual opinion /report prepared by 31 May annually Annual opinion/report signed
27/05/25
Annual opinion/report signed
17/05/24
10. Targeting Approval by CMT and A&SP of strategy and annual
plan by 31 May annually
Annual plan endorsed by CMT 
28/04/25
Annual Plan approved by A&SP
08/05/25
Annual plan endorsed by CMT
19/04/24
Annual Plan approved by A&SP
09/05/24 
Page 17 of 108

Page 18

APPENDIX 4 – Quality Assurance Improvement Programme (QAIP) Action Plan
No. Source  Recommendation Management Response  Responsible Officer
and Target Date Status
1 Self-
assessment
Annual audit plan conforms with all aspects
detailed in PSIAS and expectation is that all
assignments will be completed in the year,
however individual audits are not formally
prioritised in the plan.  
N/A Chief Officer (Audit
and Risk) 
March 2025
Complete – working
version of Internal Audit
plan for 2025-26 has
prioritised audits.   
2 Self-
assessment
Include explicit reference to QAIP and
monitoring progress of agreed actions. 
N/A Chief Officer (Audit
and Risk) 
May 2024
Complete – Included in
Internal Audit Annual
report for 2023-24 and
2024-25 
3 Self-
assessment
and EQA
The PRD process should be re-introduced for
all members of the Internal Audit team, to
ensure that all Internal Audit staff are able to
discuss and subsequently access appropriate
training and development activities.
Revised and refreshed Corporate
PRD process launched in May
2023.  Now that the re-structure of
the Audit team is complete and
recruitment for new posts is
underway the PRD process,
incorporating a formal assessment
against the skills and competency
framework, will be taken forward.
Audit Manager 
August 2024
December 2025
Revised Date –
implementation delayed
due to staffing changes
during 2024-25, but PRD
conversations will be
scheduled for the
remainder of this year.
4 Self-
assessment
and EQA
Review current best practice in relation to
assurance mapping and how other public
bodies use this to inform the Internal Audit
planning process, to ensure effective co-
ordination of activities with other assurance
providers.
The Chief Officer (Audit and Risk)
will progress work on developing
an approach to assurance mapping
in a way that allows this to inform
the 2025/26 Internal Audit Plan. 
Chief Officer (Audit
and Risk)
Audit Manager 
December 2024
August 2025
Revised Date – work in
2024-25 deferred to the
approved 2025/26 audit
plan 
Page 18 of 108

Page 19

No. Source  Recommendation Management Response  Responsible Officer
and Target Date Status
5 EQA As risk management and, in particular, counter
fraud arrangements continue to mature, the
Chief Officer (Audit and Risk), should seek
independent, external assurance on the
adequacy of these arrangements.  In doing so,
however, a pragmatic and cost-effective
approach must be taken.  One possibility may
be peer review by another Local Authority,
similar to this Internal Audit external quality
assessment process.
The Chief Officer (Audit and Risk)
will ensure that due consideration
is given to the need for
independent external assurance on
the adequacy of risk management
and counter fraud arrangements. 
This will be undertaken on an
annual basis as part of the annual
planning and reporting process.
Chief Officer (Audit
and Risk) 
April 2025
April 2026
Revised Date – audit work
in these areas in 2025-26
audit plan will be
undertaken by the Audit
Manager, independently
of the Chief Officer.  The
provision of an
independent external
review will be considered
for future years.
6 EQA The Chief Officer (Audit and Risk) and the Audit
Manager should consider the proportionality of
the current review process, particularly at the
working paper stage, to establish whether there
may be scope for further streamlining and
improving the audit process while maintaining
appropriate oversight in relation to quality
control.
The recently implemented change
to the Audit team structure will
naturally result in a change to the
current review process.  After
allowing for the new structure to
embed, the Audit Manager will
consider the proportionality of the
review process ensuring that any
amendments still facilitate the
ability to properly supervise all
engagement to ensure that
objectives are achieved, and
quality is assured.
Audit Manager 
March 2025
March 2026
Revised Date –
implementation delayed
due to staffing changes
during 2024-25,
opportunities to streamline
all audit processes will be
considered in the coming
year. 
7 Self-
assessment
Preparation of a gap analysis, comparing the
requirements of the PSIAS with the new Global
Internal Audit standards (GIAS) with action
being taken to ensure conformance.
N/A Audit Manager 
December 2025
Ongoing – gap analysis is
complete, work now
progressing on ensuring
Internal Audit conforms
with GIAS. 
Page 19 of 108

Page 20

Page 20 of 108

Page 21

North Lanarkshire Council
Report
Audit and Scrutiny Panel 
Does this report require to be approved? ☒ Yes   ☐ No
Ref SP/SL Date 26/06/25 
Strategic Governance Framework - annual review and refresh 
From  Stephen Penman, Chief Officer (Strategy and Engagement)  
E-mail PenmanSte@northlan.gov.uk Telephone 07947 997750 
Executive Summary
Good governance enables the council to effectively pursue the ambition set out in The Plan
for North Lanarkshire within appropriate controls and the management of risk.  It is also
central to ensuring effective scrutiny and delivery of statutory Best Value obligations.  This
means ensuring resources are directed in line with agreed policies, priorities, and project
management procedures, and there is sound and inclusive decision making and clear
accountability for the use of those resources in achieving improved outcomes for service
users and communities. 
Reflecting the principles in the national Delivering Good Governance in Local Government:
Framework (2016), the council’s local code of governance is set out in the Strategic
Governance Framework which was initially approved by the Audit and Scrutiny Panel in
February 2020 and subsequently refreshed and approved by the Panel each year
thereafter.  As a key item of evidence to support the development of the council’s Annual
Governance Statement, the Strategic Governance Framework collates all existing
elements and mechanisms (produced by the respective Chief Officer) into the one local
code for annual review, assessment, assurance, and reporting purposes. 
The Delivering Good Governance in Local Government: Framework (2016) requires that
each year councils test their arrangements against the good governance principles by
carrying out a review of existing arrangements, ensuring their local code is up to date, and
reporting on compliance.  With the annual review process now concluded for 2024/25 and
the Strategic Governance Framework (and the list of supporting elements and mechanisms
in Appendix B) now updated, the Audit and Scrutiny Panel has an important role to play in
terms of considering the outputs from the annual review to ensure the council’s governance
arrangements and systems of internal control continue to demonstrate effectiveness and
compliance. 
As such, this report is now presented to the Audit and Scrutiny Panel for due consideration
in line with the Panel’s role to “provide independent assurance to the council and those
charged with governance on the adequacy of the council’s risk management framework
and internal control environment”. 
Recommendations
It is recommended that the Audit and Scrutiny Panel: 
Item 3
Page 21 of 108

Page 22

1. Background 
1.1 The Audit and Scrutiny Panel are well versed in the requirement for the council to
produce an Annual Governance Statement in accordance with the Delivering Good
Governance in Local Government: Framework (2016) and accompanying Guidance
Notes for Scottish Local Authorities (2016) published by Chartered Institute of Public
Finance and Accountancy (CIPFA) in association with Society of Local Authority Chief
Executives (SOLACE).   
1.2 The production of an Annual Governance Statement is also underpinned by statute
through the Local Authority Accounts (Scotland) Regulations 2014 which requires local
authorities to “conduct a review at least once in each financial year of the effectiveness
of its system of internal control” and for the resultant statement of effectiveness to be
“considered at a meeting either of the local authority or of a committee of the local
authority whose remit includes audit or governance functions”. For local authorities in
Scotland, the statement that requires to be produced is an annual governance
statement. 
1.3 Once reviewed and endorsed by the council’s senior management team, approved by
the Audit and Scrutiny Panel, and reviewed by the external auditors each year, the
Annual Governance Statement is integrated within the council’s Annual Accounts. 
1.4 The essence underpinning the CIPFA Delivering Good Governance in Local
Government: Framework is that local government develops and shapes its own
approach to governance, taking account of the environment within which it operates. 
Within this context, it is therefore up to each local authority to: 
• Determine its own governance arrangements, or local code, underpinned by the
principles in the CIPFA Framework. The council’s own governance arrangements
are set out in the Strategic Governance Framework (see Appendix 1 attached).
• Set out its commitment to the principles of good governance outlined in the CIPFA
Framework, i.e. the 7 principles, 21 sub-principles, and 91 behaviours and actions
(see Appendix A attached).  The council’s commitment in this respect is set out in
a review programme accompanying the Strategic Governance Framework (see
Appendix B attached). 
1.5 The Strategic Governance Framework brings the principles of good governance
(1) Acknowledge the annual review which has been undertaken to refresh the Strategic
Governance Framework and ensure each of the elements and mechanisms listed
therein (as noted in Appendix B) are up to date, and on a review programme to be
updated at an appropriate internal and reported to the relevant committee,
(2) Continue to carry out their role in respect of the Strategic Governance Framework in
terms of providing independent assurance to the council and those charged with
governance on the adequacy of the council’s risk management framework and
internal control environment, and
(3) Approve the refreshed Strategic Governance Framework.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Page 22 of 108

Page 23

together with legislative requirements and management processes by which the council
is directed and controlled and through which it is accountable to, engages with, and
leads the local community.  This aims to ensure the council is able to effectively pursue
the long-term ambition set out in The Plan for North Lanarkshire, while ensuring this is
underpinned with control and the management of risk, and: 
• Resources are directed in accordance with agreed policies and according to
priorities and in line with corporate project management procedures.
• There is sound and inclusive decision making.
• There is clear accountability for the use of those resources in achieving defined
outcomes for service users and local communities. 
1.6 In practice, governance comprises the combination of structures, strategies, policies,
plans, frameworks, systems, processes, rules, codes, procedures, cultures, and values
that are used to direct, control, and manage a local authority’s operations and activities. 
These define roles and responsibilities and accountabilities and establish mechanisms
to enable a local authority to pursue its vision effectively and ensure that the vision is
underpinned with control and the management of risk.  The list of items referred to in
this paragraph are hereinafter referred to as elements and mechanisms.   
1.7 The Strategic Governance Framework therefore outlines the list of elements and
mechanisms that demonstrate the council’s compliance with the 7 principles, 21 sub-
principles, and 91 behaviours and actions contained within the CIPFA Framework.  It
should be noted that the list of elements and mechanisms (in Appendix B) does not
introduce new items of governance to the council, rather its purpose is to collate all
existing items (produced by the respective Chief Officer) into the one local code for
annual review, assessment, assurance, and reporting purposes.  
1.8 To demonstrate compliance with the CIPFA Framework all councils are required to test
their governance arrangements (local code) by carrying out the undernoted.  This
further supports the evidence base for the annual review referred to in paragraph 1.2
and thereby the production of the Annual Governance Statement. 
• Reviewing existing governance arrangements once a year to ensure that the local
code operates effectively in practice.
• Maintaining an up-to-date local code of governance that takes into account the
environment within which it operates and includes arrangements for ensuring
ongoing effectiveness.
• Reporting publicly on compliance on an annual basis, including how the
governance arrangements have been monitored for effectiveness in the year and
identifying planned changes. 
1.9 The annual review process to fulfil the requirements set out in paragraph 1.8 above is
now well established in the council. This is depicted in Figure 2 in the Strategic
Governance Framework (see page 11 in Appendix 1 attached). 
1.10 This report is now presented to the Audit and Scrutiny Panel for due consideration in
line with the Panel’s role to “provide independent assurance to the council and those
charged with governance on the adequacy of the council’s risk management framework
and internal control environment”. 
Strategic Governance Framework 
2.1 The refreshed Strategic Governance Framework attached at Appendix 1 sets out the
council’s commitment to ensuring that its business is conducted in accordance with the
Page 23 of 108

Page 24

law and proper standards, and that public money is safeguarded, properly accounted
for, and used economically, efficiently, and effectively. 
2.2 This commitment, allied to the principles of good governance set out in the CIPFA
Framework, takes into account the environment within which the council operates and,
as such, sets out the council’s local code of governance within the local context and
long-term vision of The Plan for North Lanarkshire and its delivery through the
Programme of Work.   
2.3 This commitment also supports the council in meeting its statutory Best Value
obligations as effective governance and accountability arrangements, with openness
and transparency in decision-making, schemes of delegation, and effective reporting of
performance are essential for taking informed decisions and ensuring effective scrutiny
of performance and stewardship of resources. 
2.4 The Strategic Governance Framework in Appendix 1 comprises two further
appendices: 
• Appendix A: This lists the 7 principles and 21 sub-principles from the national
Delivering Good Governance in Local Government: Framework supported by 91
behaviours and actions that according to CIPFA demonstrate good governance in
practice.
• Appendix B: Each of the specific elements and mechanisms which form the
council’s local code of governance have been aligned to the 7 principles (and 21
sub principles) within the CIPFA Framework.  The list of elements and mechanisms
set out within Appendix B provide a tangible evidence base which enables the
council to demonstrate good governance in practice. 
Review programme 
2.5 These elements and mechanisms in Appendix B span the complete range of council
activities and include arrangements for corporate governance, risk management, and
internal financial controls.  Each has been assigned a timeframe to support the review
programme and ensure they remain timely and effective in supporting delivery of the
Programme of Work and The Plan for North Lanarkshire. 
2.6 The information within Appendix B also contains an assessment of each of the
elements and mechanisms.  Based on this assessment each element and mechanism
has been assigned a RAG status.  This assessment process was first introduced at the
end of 2020/21 as a method by which to identify and prioritise items requiring to be
reviewed and updated further. 
2.7 The use of this assessment process (and corresponding RAG status) aims to ensure
all elements and mechanisms are as up to date as they require to be.  Definitions
supporting the RAG status are noted in Appendix B. 
2.8 The Strategic Governance Framework, and its accompanying review programme, have
been recognised as an area of good practice in the latest three annual Internal Audits
on Corporate Governance.  As reported to the Audit and Scrutiny Panel in August 2024,
the most recent Internal Audit considered that the “council’s corporate governance
arrangements in relation to self-assessment are adequate and operating effectively”
and therefore this audit was assessed as providing “substantial assurance”. 
Annual assurance certificate and checklist process 
Page 24 of 108

Page 25

2.9 Notwithstanding this, areas for improvement were identified by Internal Audit in their
2023 corporate governance audit for which remedial actions were approved by the
Business Management Team in March 2024 prior to implementation.  At that time, a
substantial review of the council’s annual governance review process was already
underway which led to further improvements (in particular in relation to the Chief
Officer’s annual assurance certificate and checklist process and contents as well as
alignment to, and the contents of, the Annual Governance Statement) which were
implemented as at the 2023/24 year-end process. 
2.10 A further area for improvement was identified by Internal Audit in their 2024 corporate
governance audit which related to ensuring that “details of any omissions by Chief
Officers and/or Chief Executives of ALEOs in completing the annual assurance
certificate and checklist are reported to BMT. Thereafter BMT should take appropriate
action to ensure that the final versions of the annual assurance certificates and
checklists have been fully completed, signed and dated.” 
2.11 Therefore, as in previous years, each Chief Officers annual assurance certificate and
checklist has been reviewed upon receipt and as reported to the Business Management
Team on 5th June 2025 - in line with the Internal Audit recommendation - all have been
completed, signed, and dated.   
Next steps 
2.12 Although the Strategic Governance Framework is subject to an annual review and
refresh process, it is not a static document and as such: 
(a) Chief Officers are responsible for ensuring that all elements and mechanisms
within their area of responsibility are reviewed and updated, and submitted to the
Business Management Team / Corporate Management Team and/or relevant
Committee (as appropriate), in line with the review programme.
(b) The list of elements and mechanisms will continue to be kept under review to
ensure any other council developments or legislative changes are considered for
inclusion in the council’s local code of governance, as appropriate. 
2.13 The undernoted list was first introduced in June 2021 for Chief Officers to use when
reviewing and updating each of the elements and mechanisms contained within the
Strategic Governance Framework review programme.  This has continued to be
implemented since 2021/22 with no adverse feedback received.  As such, all reports to
the Business Management Team / Corporate Management Team, and/or relevant
Committee - which provide an update on work to review and/or update an element or
mechanism in Appendix B - will continue to require to contain the following: 
• An assessment of the effectiveness of the particular element or mechanism.
• A summary outlining the changes / improvements made to the element or
mechanism since the last update.
• The role of the element or mechanism in supporting the successful delivery of The
Plan for North Lanarkshire. 
3. Measures of success 
3.1  Good governance enables the council to effectively pursue the ambition set out in The
Plan for North Lanarkshire within appropriate controls and the management of risk.  It
is also central to ensuring effective scrutiny and delivery of statutory Best Value
obligations.   
Page 25 of 108

Page 26

A measure of success in respect of the Strategic Governance Framework is in ensuring
the elements and mechanisms on the review programme remain up to date and
effective in supporting delivery of the Programme of Work and achieving the vision set
out in The Plan for North Lanarkshire. 
4. Supporting documentation 
4.1 Appendix 1  -  Strategic Governance Framework
• Appendix A: 7 principles, 21 sub-principles, and 91 behaviours and
actions that demonstrate good governance in practice in line with
the national Delivering Good Governance in Local Government:
Framework (2016)
• Appendix B: North Lanarkshire Council local code of governance
review programme 
Stephen Penman
Chief Officer (Strategy and Engagement) 
5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
The Delivering Good Governance in Local Government: Framework (2016)
positions the attainment of sustainable economic, societal, and environmental
outcomes as a key focus of governance processes and structures.  As such this is
reflected in the Strategic Governance Framework review programme. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Yes ☐ No ☒
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts been discussed and agreed with
Finance?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Development and publication of the Strategic Governance Framework supports the
council’s compliance with the CIPFA Statement on the Role of the Chief Financial
Officer in Local Government (2016) in terms of financial controls.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
Page 26 of 108

Page 27

If Yes, have all relevant HR impacts been discussed and agreed with People
Resources?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or scheduled) by the Enterprise Architecture
Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
The Delivering Good Governance in Local Government: Framework (2016)
positions the attainment of sustainable economic, societal, and environmental
outcomes as a key focus of governance processes and structures.  As such this is
reflected in the Strategic Governance Framework review programme.
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Page 27 of 108

Page 28

Work to review and refresh the Strategic Governance Framework - and ensure the
council continues to support the Best Value duty and comply with the principles set
out within the Delivering Good Governance in Local Government: Framework
(2016) - contributes towards the mitigation of the risk on the Corporate Risk
Register for Governance, Leadership, and Decision Making.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 28 of 108

Page 29

1 
Strategic Governance Framework  
Appendix 1
Page 29 of 108

Page 30

2 
Document control
Title Strategic Governance Framework
Owner Stephen Penman, Chief Officer (Strategy and Engagement) Contact PenmanSte@northlan.gov.uk 
Governance group Audit and Scrutiny Panel
Author Susan Lawrie, Strategy, Performance, Data Manager Contact LawrieS@northlan.gov.uk 
Revision history
Number Originator Date review commenced Revision description / record of change
1.0 Linda Johnston, Business Strategy Manager 2020 Original framework created
2.0 Linda Johnston, Business Strategy Manager June 2021 Annual review
3.0 Linda Johnston, Business Strategy Manager June 2022 Annual review
4.0 Linda Johnston, Business Strategy Manager April 2023 Annual review
5.0 Linda Johnston, Business Strategy Manager April 2024 Annual review
6.0 Linda Johnston, Strategy and Customer Experience Manager April 2025 Annual review 
Document approvals
Number Governance group Date approval granted Date approval to be requested (if document still
draft)
1.0 Audit and Scrutiny Panel 2020 
2.0 Audit and Scrutiny Panel September 2021 
3.0 Audit and Scrutiny Panel September 2022 
4.0 Audit and Scrutiny Panel June 2023 
5.0 Audit and Scrutiny Panel June 2024 
6.0 Audit and Scrutiny Panel  June 2025 
Consultation record (for most recent update)
Status of document consulted upon Strategic Governance Framework
Stakeholders consulted / date Business Management Team (05/06/25); Corporate Management Team (13/06/25) 
Strategic alignment 
Next review date
Review date April 2026 
The Plan for North Lanarkshire and all 5 priorities and 25 ambition statements therein, the Programme of Work, Strategic Policy Framework, Strategic Performance
Framework, Strategic Self-Evaluation Framework, and Project Management Framework.
Page 30 of 108

Page 31

3 
Table of contents 
Page
number
Introduction  ……………………………………………………………………………………….. 4
Good governance in the public sector ………………………………………………………... 5
Good governance in local government  ………………………………………………………. 6
Local code of governance  ……………………………………………………………………….  7 - 11
- Requirements  …………………………………………………………………………………. 7
- Local context  ………………………………………………………………………………….. 7-8
- Local code of governance  ………………………………………………...…………………. 8
- Continuous improvement  ………………………………….…………................................. 8-9
- Roles and responsibilities  ……………………………………………………………………. 9-10
- Annual review process  ……………………………………………………………………….. 10-11
Appendix A: 7 principles and 21 sub-principles from the national Framework  …………….. 12 - 16
Appendix B: North Lanarkshire Council local code of governance review programme  …... 17 - 47 
Page 31 of 108

Page 32

4 
Introduction 
The Plan for North Lanarkshire sets the long-term strategic direction for
the council, partners, and other stakeholders and, most importantly, for
each unique community and the people who Live, Learn, Work, Invest,
and Visit within North Lanarkshire.  It’s a Plan with a shared ambition of
inclusive growth and prosperity for all to bring equal benefits and a fairer
distribution of wealth to all North Lanarkshire’s people and communities. 
As the delivery vehicle for The Plan for North Lanarkshire, the
Programme of Work enables a recurring and dynamic approach to
translating the vision into priorities for action. Approved in March 2023,
the new five-year Programme of Work to 2028 was reframed within the
latest North Lanarkshire context provided by the 28 Health Check
Indicators. This was critical to ensure an even greater focus on
escalating the pace and depth of change that is essential to ensure a
heightened and more strategic focus on not only sustaining the economic
and community aspects that will enable local people and communities
(and the place that is North Lanarkshire) to thrive, but also on ensuring a
more targeted approach to improving social conditions, outcomes, and
people’s lives.  An annual review programme is in place to ensure that
the Programme of Work remains current, relevant, and deliverable. 
Key to assessing the success of The Plan for North Lanarkshire are six
inter-related strategic frameworks that focus on ensuring a corporate one
council approach to ensuring each stage of delivery is appropriately
aligned, planned, guided, implemented, monitored, and governed.   
• Strategic Governance Framework
• Strategic Policy Framework
• Strategic Performance Framework
• Strategic Self-Evaluation Framework 
• Project Management Framework 
• Framework for Demonstrating Improved Outcomes for Communities 
To ensure these frameworks remain aligned to The Plan for North
Lanarkshire and Programme of Work, all are on a regular review and
refresh programme.  This also helps the council to ensure it is proactive
in responding to social, economic, and environmental trends and
changes in legislation and governance, as well as the broad range of
national policy changes and new developments. 
The Strategic Governance Framework is set out within this document.  
To comply with good governance principles, the council must ensure that
its business is conducted in accordance with the law and proper
standards, and that public money is safeguarded, properly accounted for,
and used economically, efficiently, and effectively. 
Good governance is also central to meeting statutory Best Value
obligations as effective governance and accountability arrangements -
with openness and transparency in decision-making, schemes of
delegation, and effective reporting of performance - are essential for
taking informed decisions and ensuring effective scrutiny of performance
and stewardship of resources. 
To ensure its good governance arrangements are sound and the highest
standards are met, the council is required to set out its commitment to
the national principles of good governance by determining its own
governance structure (local code) underpinned by these principles.   
The council’s local code in this respect is set out on pages 7 to 11.  This
brings the principles of good governance together with legislative
requirements and management processes by which the council is
directed and controlled and through which it is accountable to, engages
with, and leads the local community. 
This aims to ensure the council is able to effectively pursue the long-term
ambition set out in The Plan for North Lanarkshire, while ensuring this is
underpinned with control and the management of risk, and:
• Resources are directed in accordance with agreed policies and
according to priorities, and in line with corporate project
management procedures.
• There is sound and inclusive decision making.
• There is clear accountability for the use of those resources in
achieving defined outcomes for service users and local
communities. 
Chief Officers and Elected Members are responsible for determining and
implementing the council’s governance arrangements and ensuring the
local code is assessed on an annual basis to ensure ongoing
effectiveness and compliance.  In this respect the council’s annual review
process is depicted on page 11 and the review programme is set out in
Appendix B (starting from page 17).
Page 32 of 108

Page 33

5 
Good governance in the public sector 
The principles of good governance in the public sector are defined by the International Framework: Good Governance in the Public Sector which was jointly
developed by the Chartered Institute of Public Finance and Accountancy (CIPFA) and the International Federation of Accountants (IFAC). 
The International Framework offers the definition that:
• “Governance comprises the arrangements put in place to ensure that the intended outcomes for stakeholders are defined and achieved.” 
The fundamental function of good governance is to ensure that governing bodies (and individuals working for public sector entities) achieve their intended
outcomes while acting in the public interest at all times.  Acting in the public interest implies primary consideration of the benefits for society, which should
result in positive outcomes for service users and other stakeholders, and requires: 
A. Behaving with integrity, demonstrating strong commitment to ethical values, and respecting the
rule of law.
B. Ensuring openness and comprehensive stakeholder engagement. 
In addition to the overarching requirements for acting in the public interest (as noted in principles A. and
B. above), achieving good governance also requires effective arrangements for: 
C. Defining outcomes in terms of sustainable economic, social, and environmental benefits.
D. Determining the interventions necessary to optimise the achievement of the intended
outcomes.
E. Developing the entity’s capacity, including the capability of its leadership and the individuals
within it.
F. Managing risks and performance through robust internal control and strong public financial
management.
G. Implementing good principles in transparency, reporting, and audit, to deliver effective
accountability. 
Figure 1 illustrates the 7 principles of good governance (A. to G. listed above) and outlines how they
relate to each other.  Principles A. and B. underpin implementation of principles C. to G.   
Figure 1 also illustrates that good governance is dynamic and that a public body should be committed
to improving governance on a continuing basis through a process of review and evaluation. 
The aim of the International Framework is to encourage better service delivery and improved accountability by
establishing a benchmark for aspects of good governance in the public sector. 
Figure 1
Page 33 of 108

Page 34

6 
Good governance in local government 
The principles in the International Framework have been interpreted for the local government environment.  This is set out in the Delivering Good
Governance in Local Government: Framework (2016) and accompanying Guidance Notes for Scottish Local Authorities (2016) published by CIPFA in
association with the Society of Local Authority Chief Executives (SOLACE).   
The Delivering Good Governance in Local Government: Framework details the 7 principles within the International Framework along with a set of 21
supporting sub-principles.  The 7 principles and 21 supporting sub-principles are specified in Appendix A on page 12. 
In practice, governance comprises the combination of structures, strategies, policies, plans, frameworks, systems, processes, rules, codes, procedures,
cultures, and values that are used to direct, control, and manage a local authority’s operations and activities.  This includes political, economic, social,
environmental, legal, and administrative structures and processes, and other arrangements, as encapsulated in the principles defined in the Framework. 
These define roles and responsibilities and accountabilities and establish mechanisms to enable a local authority to pursue its vision effectively, ensuring that
the vision is underpinned with control and the management of risk.  The list of items referred to in this paragraph are hereinafter referred to as elements and
mechanisms.  Through these elements and mechanisms the overall aim is to ensure: 
• Resources are directed in accordance with agreed policy and according to priorities, and in line with corporate project management procedures.
• There is sound and inclusive decision making.
• There is clear accountability for the use of those resources in achieving defined outcomes for service users and local communities. 
The essence underpinning the Delivering Good Governance in Local Government: Framework is that local government develops and shapes its own
approach to governance, taking account of the environment within which it operates.  Within this context, it is therefore up to each local authority to: 
• Set out its commitment to the principles of good governance outlined in the Delivering Good Governance in Local Government: Framework.
• Determine its own governance arrangements, or local code, underpinned by these principles.
• Ensure that the local code operates effectively in practice. 
A crucial aspect in delivering good governance is the way that it is applied.  The ethos of good governance cannot be achieved by structures, rules, and
procedures alone.  Effectively, good governance needs to be embedded within an organisation and its culture and the need for, and value of, good
governance must be explicit. 
Reflecting the principles in the Delivering Good Governance in Local Government: Framework, the local code set out in this Strategic Governance
Framework demonstrates North Lanarkshire Council’s commitment to good governance and outlines the arrangements in place in line with the 7 principles
and 21 supporting sub-principles. 
Page 34 of 108

Page 35

7 
Local code of governance 
Requirements
By defining the 7 principles and 21 supporting sub-principles, the Delivering Good Governance in Local Government: Framework provides a structure to help
the council set out its arrangements in relation to good governance.   
All councils are required to test their governance arrangements against these principles by: 
• Reviewing existing governance arrangements once a year to ensure that the local code operates effectively in practice.
• Maintaining an up-to-date local code of governance that takes into account the environment within which it operates and includes arrangements for
ensuring ongoing effectiveness.
• Reporting publicly on compliance on an annual basis, including how the governance arrangements have been monitored for effectiveness in the year
and identifying planned changes. 
Local context
The Plan for North Lanarkshire was established in 2019 with a very clear vision - inclusive growth and prosperity for all - to bring equal benefits and a fairer
distribution of wealth to all North Lanarkshire’s people and communities.   
• Founded on a place-based ambition, The Plan for North Lanarkshire has at its core an ambition to transform the physical environment of North
Lanarkshire in a way that recognises the intrinsic value - and economic, social, and health benefits - gained in doing so.
• This ambition recognises that implementing a place-based approach originates from the need to address spatial concentrations of disadvantage which,
in recent years, have become further exacerbated by a growing complexity of problems being presented in terms of economical, health, and social
issues.  As such, a place-based approach aims to target an entire community and tackle issues that exist at the neighbourhood level (such as
employment, education, skills, economic stability, housing, and health), and address fragmented service provision that leads to gaps or duplication.
• Investing in a place-based approach and focusing on the physical environment of local communities, and better integrated and more accessible
service systems, underpins the holistic approach (that crosses public sectors and service silos) being delivered through the Programme of Work.  
• The Plan for North Lanarkshire provides a very clear and compelling narrative which the council is working towards, a narrative that has become well
embedded throughout the strategic management, financial decision making, strategy and policy development, corporate governance approaches, and
service delivery across the organisation. 
The Plan for North Lanarkshire’s vision was shaped by the area’s demographic, social, and economic profile which at the time showed a positive picture in
terms of economic growth, inward investment, employment, and educational attainment, but still unacceptably high levels of deprivation and child poverty
and clear areas of inequity and inequality.  This meant that not all North Lanarkshire’s people were sharing equally in the improving picture, and there was an
element of social exclusion across some towns and communities.   
• 28 high level health check indicators have since collectively provided a robust, consistent, and independent way of setting the context for North
Lanarkshire as a place, as well as assessing changes in North Lanarkshire’s profile over time.  As such, trends in the indicators (as at 2023) helped to
reframe a new five-year Programme of Work to 2028 which was considered crucial to ensure a heightened and more strategic focus on not only
sustaining the positive economic aspects, but also on ensuring a more targeted approach to improving social conditions and outcomes.
• While the post pandemic environment may have seen more stable years for council operations, recovery from the pandemic changed the landscape Page 35 of 108

Page 36

8 
within which The Plan for North Lanarkshire requires to be delivered.  Inflationary pressures, the impact of rising prices on the cost of living, and
national public sector reform agendas have exacerbated conditions for those in the most vulnerable situations and impacted on the council in terms of
maintaining a seamless approach to delivering services and progressing capital programmes that seek to mitigate against the range of different and
complex economic, social, and health issues that exist.  
• As such, a new five-year Programme of Work to 2028 was approved in March 2023.  This was reframed within the aforementioned context to ensure
that the stubborn scale of deprivation in areas that are hardest to reach is targeted through policy developments that are focused on tackling unstable
trends.  The Programme of Work to 2028 was followed by a supporting single integrated one council Delivery Plan reported to the Policy and Strategy
Committee in March and September 2024.   
As the delivery vehicle for the shared ambition, the Programme of Work provides a roadmap for work across the council which has been instrumental in
stabilising the strategic direction of the council (including work in partnership) in the face of a fast paced, rapidly changing, and relentlessly uncertain future
local government environment, while allowing for appropriate flexibility in the operational delivery of many complex inter-connected programmes, projects,
activities, and plans to ensure a dedicated focus on transformational change that improves the lives of local people. 
• A regular review process has enabled a recurring and dynamic approach to ensuring the Programme of Work remains current, relevant, and
deliverable.  This has enabled delivery of the long-term vision to be informed by a process that is framed within the context of the local demographic,
social, and economic profile that shaped The Plan for North Lanarkshire, as well as national policy changes and developments.  This also ensures a
targeted and cohesive approach to establishing the programmes, projects, and activities required to achieve the intended outcomes.
• This approach is considered critical to deliver The Plan for North Lanarkshire through both place-based regeneration and person-based policies that
cross policy sectors and are developed and implemented in tandem - as well as integrated with wider investment and poverty reduction strategies - if
transformational change is to truly make a difference.
• More recently, the results from the 28 health check indicators, reviewed by the Policy and Strategy Committee in March 2025, showed that while 50%
of the indicators indicated improvement over the period of The Plan for North Lanarkshire, gains were fragile and challenges remained.  Therefore,
within this context, a mid-term review of the five-year Programme of Work has commenced during 2025 - the scope for which was reported to the
Policy and Strategy Committee in March 2025. 
The Programme of Work is underpinned by a governance framework which sets out, inter alia, roles and responsibilities, alignment across other corporate
processes, and the corresponding monitoring, reporting, internal controls, and quality assurance arrangements.  Six monthly Programme of Work progress
reports support the role of the Policy and Strategy Committee in maintaining their strategic oversight role (in line with the Scheme of Administration) of the
overall Programme of Work to 2028 in relation to “development, co-ordination, and monitoring of The Plan for North Lanarkshire” and to keep under review
such “programmes as the Committee considers necessary to achieve the council’s long-term aims and objectives”. 
Local code of governance
The council’s local code of governance outlines the elements and mechanisms in place to ensure appropriate oversight of the council’s governance
arrangements and systems of internal control in delivering The Plan for North Lanarkshire and its supporting Programme of Work, care, supports, and
services.  These arrangements and controls enable the council to monitor the delivery of its ambitions, while ensuring arrangements for corporate
governance, risk management, and internal financial controls are sound.  The specific details on each of the elements and mechanisms in the local code of
governance are set out in Appendix B. 
Continuous improvement
Introduced under the Local Government in Scotland Act 2003, the council has a duty to ensure Best Value.  This requires the council to “make arrangements Page 36 of 108

Page 37

9 
to secure continuous improvement in performance” in the way in which its functions are exercised, having regard to a combination of economy, efficiency,
and effectiveness.   
Good governance is central to meeting statutory Best Value obligations as effective governance and accountability arrangements - with openness and
transparency in decision-making, schemes of delegation, and effective reporting of performance - are essential for taking informed decisions and ensuring
effective scrutiny of performance and stewardship of resources. 
Areas requiring improvement are identified through the work of the Internal Audit function, the external auditors Annual Audit Report (AAR), the national
thematic Best Value audit work, various external bodies’ audit / inspection / regulation reports, and the council’s Strategic Self-Evaluation Framework rolling
review programme.  Outputs from these processes are a key piece of evidence which informs the development of the Annual Governance Statement. 
The council’s Strategic Self-Evaluation Framework is aligned to the seven Best Value themes: 
1. Vision and leadership.
2. Governance and accountability.
3. Use of resources.
4. Partnerships and collaborative working.
5. Working with communities. 
6. Sustainable development.
7. Fairness and equality. 
These themes are outlined within the national guidance (updated in 2020 and available at: https://www.gov.scot/publications/best-value-revised-statutory-
guidance-2020/) which is designed to help local authorities and other public bodies to demonstrate continuous improvement in their performance. 
Improvements to the process to review effectiveness were first introduced in 2021 through the establishment of the following list for Chief Officers to use when
reviewing and updating each of the elements and mechanisms on the Strategic Governance Framework review programme.  As such, all reports to the
Business Management Team, Corporate Management Team, and/or a Committee - which provide an update on work to review and refresh an element or
mechanism in Appendix B - require to contain the following: 
• An assessment of the effectiveness of the particular element or mechanism.
• A summary outlining the changes / improvements made to the element or mechanism since the last update.
• The role of the element or mechanism in supporting the successful delivery of The Plan for North Lanarkshire. 
Roles and responsibilities  
Chief Officers and Elected Members are responsible for determining and implementing the council’s governance arrangements and ensuring the Strategic
Governance Framework is assessed on an annual basis to ensure ongoing effectiveness and compliance. 
In identifying how the effectiveness of the council’s governance arrangements has been monitored and evaluated in the year, the Business Management
Team and Corporate Management Team also have a key role to play in terms of identifying any improvement actions and/or future planned developments in
relation to key governance arrangements, systems of internal control, and continuous improvement activity. 
• The Business Management Team role in relation to governance, strategic oversight, assurance, and continuous improvement is carried out in line with
their remit “To monitor the efficient and effective operation of the council” and secure the relevant assurances that “the council is able to effectively
pursue the long-term ambition set out in The Plan for North Lanarkshire by ensuring this is underpinned with the relevant assurances and controls in
terms of corporate governance [including performance, legal, and hr matters], risk management, and financial management.”  This means the Page 37 of 108

Page 38

10 
Business Management Team role is that of assurance, not directing or monitoring delivery unless the ongoing assessment of assurance require
improvement in this respect.
• The Corporate Management Team role in relation to governance, strategic oversight, assurance, and continuous improvement is carried out in line with
their remit “To consider the strategic context and environment within which the council is operating, understand the position of the organisation, and
consider the future direction. To consider the implementation of strategic decisions at a council wide level and the impact on the delivery of The Plan
for North Lanarkshire and Programme of Work. To agree the one council approach required in order to deliver on the council’s priorities (in partnership
where required) in line with the strategic direction and monitor the delivery of the Programme of Work.”    This means the Corporate Management
Team role has a focus on improvement over time in delivering the council’s strategic priorities through the Programme of Work. 
As set out in the Scheme of Administration (December 2024), the Audit and Scrutiny Panel is a key component of the council’s corporate governance
arrangements. The purpose of the Audit and Scrutiny Panel is to “provide independent assurance to the council and those charged with governance on the
adequacy of the council’s risk management framework and internal control environment. It provides independent review of the council’s governance, risk
management, performance and control frameworks and oversees the financial reporting and annual governance processes. It oversees the council’s internal
and external audit arrangements, helping to ensure efficient and effective assurance arrangements are in place. It also undertakes the scrutiny function within
the council’s governance framework and will establish short life task group reviews, as required, to undertake in-depth examination of particular areas of
policy and/or service delivery with a view to making recommendations for improvement.” 
Annual review
An assessment of the council’s governance arrangements is undertaken on an annual basis - the process is outlined in Figure 2 on page 11.  This aims to: 
• Ensure the council can demonstrate compliance with the principles in the Delivering Good Governance in Local Government: Framework and that the
governance arrangements operate effectively in practice.
• Identify any improvement actions and/or future planned developments required in relation to the council’s key governance arrangements and
continuous improvement activity. 
The annual review process is an important aspect of the work undertaken each year to assess the effectiveness of the council’s governance arrangements
and system of internal control and establish the evidence base to inform the council’s Annual Governance Statement and various elements and mechanisms,
and roles and responsibilities, play a key role in this process.  These sources of assurance are listed below: 
1) Compliance with the CIPFA Position Statement: Audit Committees in Local Authorities (2018).  
2) Compliance with the CIPFA Statement on the role of the Head of Internal Audit in public service organisations (2019).  
3) Compliance with the CIPFA Statement on the role of the Chief Financial Officer in Local Government (2016).  
4) Compliance with the CIPFA Code of Practice on Managing the Risk of Fraud and Corruption (2014).  
5) Compliance with the Public Sector Internal Audit Standards (PSIAS).
6) Chief Officers year-end good governance assurance certificates and checklists.
7) Arm’s length external organisations (ALEOs) year-end good governance assurance certificates and checklists.  
8) Annual review and update of the local code of governance review programme (i.e. the Strategic Governance Framework).  
9) The Annual Audit Report (AAR) process undertaken by the external auditors, together with the national approach to auditing Best Value through
thematic audit work.
10) Findings from other audit, scrutiny, or inspection bodies in relation to service specific assessments.
11) The role of the council’s senior management team structure of meetings in respect of good governance, assurance, and continuous improvement. Page 38 of 108

Page 39

11 
Figure 2
Annual review
process
Page 39 of 108

Page 40

12 
Appendix A: 7 principles and 21 sub-principles 
The 7 principles (A. to G.) within the International Framework: Good Governance in the Public Sector together with the 21 supporting sub-principles set out in
the Delivering Good Governance in Local Government: Framework are listed in the table below (pages 12 to 16) along with 91
examples of behaviours and actions that according to CIPFA demonstrate good governance in practice. 
A. Behaving with integrity, demonstrating strong commitment to ethical values, and respecting the rule of law.
B. Ensuring openness and comprehensive stakeholder engagement.
C. Defining outcomes in terms of sustainable economic, social, and environmental benefits.
D. Determining the interventions necessary to optimise the achievement of the intended outcomes.
E. Developing the entity’s capacity, including the capability of its leadership and the individuals within it.
F. Managing risks and performance through robust internal control and strong public financial management.
G. Implementing good principles in transparency, reporting, and audit, to deliver effective accountability. 
e.g. 
• Principle A = Behaving with integrity, demonstrating strong commitment to ethical values, and respecting the rule of law.
• Sub-principles = A1. BEHAVING WITH INTEGRITY, A2. DEMONSTRATING STRONG COMMITMENT TO ETHICAL VALUES, A3. RESPECTING THE RULE OF LAW.
• Listed below each sub-principle are the behaviours and actions that demonstrate good governance in practice (e.g. 1.1 to 1.4; 2.1 to 2.4; 3.1 to 3.5). 
A. Behaving with integrity, demonstrating strong commitment to ethical values, and respecting the rule of law
A1. BEHAVING WITH INTEGRITY A2. DEMONSTRATING STRONG COMMITMENT TO
ETHICAL VALUES A3. RESPECTING THE RULE OF LAW
1.1  Ensuring members and officers behave with integrity
and lead a culture where acting in the public interest
is visibly and consistently demonstrated thereby
protecting the reputation of the organisation.
1.2  Ensuring members take the lead in establishing
specific standard operating principles or values for
the organisation and its staff and that they are
communicated and understood. These should build
on the seven Principles of Public Life (also known as
the Nolan principles), i.e. selflessness, integrity,
objectivity, accountability, openness, honesty, and
leadership. 
1.3  Leading by example and using these standard
operating principles or values as a framework for
decision making and other actions.
1.4  Demonstrating, communicating, and embedding the
standard operating principles or values through
appropriate policies and processes which are
reviewed on a regular basis to ensure that they are
operating effectively. 
2.1  Seeking to establish, monitor and maintain the
organisation’s ethical standards and performance.
2.2  Underpinning personal behaviour with ethical values
and ensuring they permeate all aspects of the
organisation’s culture and operation.
2.3  Developing and maintaining robust policies and
procedures which place emphasis on agreed ethical
values.
2.4  Ensuring that external providers of services on behalf
of the organisation are required to act with integrity
and in compliance with high ethical standards
expected by the organisation.
3.1  Ensuring members and staff demonstrate a strong
commitment to the rule of the law as well as adhering
to relevant laws and regulations.
3.2  Creating the conditions to ensure that the statutory
officers, other key post holders and members are
able to fulfil their responsibilities in accordance with
legislative and regulatory requirements.
3.3  Striving to optimise the use of the full powers
available for the benefit of citizens, communities, and
other stakeholders.
3.4  Dealing with breaches of legal and regulatory
provisions effectively.
3.5  Ensuring corruption and misuse of power are dealt
with effectively.
Page 40 of 108

Page 41

13 
B. Ensuring openness and comprehensive stakeholder engagement
B1. OPENNESS B2. ENGAGING COMPREHENSIVELY WITH
INSTITUTIONAL STAKEHOLDERS
B3. ENGAGING STAKEHOLDERS EFFECTIVELY,
INCLUDING INDIVIDUAL CITIZENS AND SERVICE USERS
1.1  Ensuring an open culture through demonstrating,
documenting, and communicating the organisation’s
commitment to openness.
1.2  Making decisions that are open about actions, plans,
resource use, forecasts, outputs, and outcomes. The
presumption is for openness. If that is not the case, a
justification for the reasoning for keeping a decision
confidential should be provided.
1.3  Providing clear reasoning and evidence for decisions
in both public records and explanations to
stakeholders and being explicit about the criteria,
rationale and considerations used. In due course,
ensuring that the impact and consequences of those
decisions are clear.
1.4  Using formal and informal consultation and
engagement to determine the most appropriate and
effective interventions/ courses of action.
2.1  Effectively engaging with institutional stakeholders to
ensure that the purpose, objectives and intended
outcomes for each stakeholder relationship are clear
so that outcomes are achieved successfully and
sustainably.
2.2  Developing formal and informal partnerships to allow
for resources to be used more efficiently and
outcomes achieved more effectively.
2.3  Ensuring that partnerships are based on - trust, a
shared commitment to change, a culture that
promotes and accepts challenge among partners -
and that the added value of partnership working is
explicit.
3.1  Establishing a clear policy on the type of issues that
the organisation will meaningfully consult with or
involve individual citizens, service users and other
stakeholders to ensure that service (or other)
provision is contributing towards the achievement of
intended outcomes.
3.2  Ensuring that communication methods are effective,
and that members and officers are clear about their
roles with regard to community engagement.
3.3  Encouraging, collecting, and evaluating the views and
experiences of communities, citizens, service users
and organisations of different backgrounds including
reference to future needs.
3.4  Implementing effective feedback mechanisms in
order to demonstrate how their views have been
taken into account.
3.5  Balancing feedback from more active stakeholder
groups with other stakeholder groups to ensure
inclusivity.
3.6  Taking account of the interests of future generations
of taxpayers and service users.
C. Defining outcomes in terms of sustainable economic, social, and environmental benefits
C1. DEFINING OUTCOMES C2. SUSTAINABLE ECONOMIC, SOCIAL, AND ENVIRONMENTAL BENEFITS
1.1  Having a clear vision which is an agreed formal statement of the organisation’s
purpose and intended outcomes containing appropriate performance indicators,
which provides the basis for the organisation’s overall strategy, planning and other
decisions.
1.2  Specifying the intended impact on, or changes for, stakeholders including citizens
and service users. It could be immediately or over the course of a year or longer.
1.3  Delivering defined outcomes on a sustainable basis within the resources that will be
available.
1.4  Identifying and managing risks to the achievement of outcomes.
1.5  Managing service users’ expectations effectively with regard to determining
priorities and making the best use of the resources available.
2.1  Considering and balancing the combined economic, social, and environmental
impact of policies, plans and decisions when taking decisions about service
provision.
2.2  Taking a longer-term view with regard to decision making, taking account of risk and
acting transparently where there are potential conflicts between the organisation’s
intended outcomes and short-term factors such as the political cycle or financial
constraints.
2.3  Determining the wider public interest associated with balancing conflicting interests
between achieving the various economic, social, and environmental benefits,
through consultation where possible, in order to ensure appropriate trade-offs.
2.4  Ensuring fair access to services.
D. Determining the interventions necessary to optimise the achievement of the intended outcomes
D1. DETERMINING INTERVENTIONS D2. PLANNING INTERVENTIONS D3. OPTIMISING ACHIEVEMENT OF INTENDED Page 41 of 108

Page 42

14 
OUTCOMES
1.1  Ensuring decision makers receive objective and
rigorous analysis of a variety of options indicating
how intended outcomes would be achieved and
including the risks associated with those options.
Therefore, ensuring best value is achieved however
services are provided.
1.2  Considering feedback from citizens and service users
when making decisions about service improvements
or where services are no longer required in order to
prioritise competing demands within limited resource
available including people, skills, land, and assets
and bearing in mind future impacts.
2.1  Establishing and implementing robust planning and
control cycles that cover strategic and operational
plans, priorities, and targets.
2.2  Engaging with internal and external stakeholders in
determining how services and other courses of action
should be planned and delivered.
2.3  Considering and monitoring risks facing each partner
when working collaboratively including shared risks.
2.4  Ensuring arrangements are flexible and agile so that
the mechanisms for delivering outputs can be
adapted to changing circumstances.
2.5  Establishing appropriate key performance indicators
(KPIs) as part of the planning process in order to
identify how the performance of services and projects
is to be measured.
2.6  Ensuring capacity exists to generate the information
required to review service quality regularly.
2.7  Preparing budgets in accordance with organisational
objectives, strategies, and the medium-term financial
plan.
2.8  Informing medium and long-term resource planning
by drawing up realistic estimates of revenue and
capital expenditure aimed at developing a sustainable
funding strategy.
3.1  Ensuring the medium-term financial strategy
integrates and balances service priorities,
affordability, and other resource constraints.
3.2  Ensuring the budgeting process is all-inclusive, taking
into account the full cost of operations over the
medium and longer term.
3.3  Ensuring the medium-term financial strategy sets the
context for ongoing decisions on significant delivery
issues or responses to changes in the external
environment that may arise during the budgetary
period in order for outcomes to be achieved while
optimising resource usage.
3.4  Ensuring the achievement of ‘social value’ through
service planning and commissioning.
E. Developing the entity’s capacity, including the capability of its leadership and the individuals within it
E1. DEVELOPING THE ENTITY’S CAPACITY E2. DEVELOPING THE CAPABILITY OF THE ENTITY’S LEADERSHIP AND OTHER
INDIVIDUALS
1.1  Reviewing operations, performance and use of assets on a regular basis to ensure
their continuing effectiveness.
1.2  Improving resource use through appropriate application of techniques such as
benchmarking and other options in order to determine how the authority’s resources
are allocated so that outcomes are achieved effectively and efficiently.
1.3  Recognising the benefits of partnerships and collaborative working where added
value can be achieved.
1.4  Developing and maintaining an effective workforce plan to enhance the strategic
allocation of resources.
2.1  Developing protocols to ensure that elected and appointed leaders negotiate with
each other regarding their respective roles early on in the relationship and that a
shared understanding of roles and objectives is maintained.
2.2  Publishing a statement that specifies the types of decisions that are delegated and
those reserved for the collective decision making of the governing body.
2.3  Ensuring the leader and the chief executive have clearly defined and distinctive
leadership roles within a structure, whereby the chief executive leads the authority
in implementing strategy and managing the delivery of services and other outputs
set by members and each provides a check and a balance for each other’s
authority.
2.4 Developing the capabilities of members and senior management to achieve
effective shared leadership and to enable the organisation to respond successfully
to changing legal and policy demands as well as economic, political, and
environmental changes and risks by - ensuring members and staff have access to Page 42 of 108

Page 43

15 
appropriate induction tailored to their role and that ongoing training and
development matching individual and organisational requirements is available and
encouraged, ensuring members and officers have the appropriate skills, knowledge,
resources, and support to fulfil their roles and responsibilities and ensuring that they
are able to update their knowledge on a continuing basis, and ensuring personal,
organisational and system-wide development through shared learning, including
lessons learnt from both internal and external governance weaknesses.
2.5  Ensuring that there are structures in place to encourage public participation.
2.6  Taking steps to consider the leadership’s own effectiveness and ensuring leaders
are open to constructive feedback from peer review and inspections.
2.7  Holding staff to account through regular performance reviews which take account of
training or development needs.
2.8  Ensuring arrangements are in place to maintain the health and wellbeing of the
workforce and support individuals in maintaining their own physical and mental
wellbeing
F. Managing risks and performance through robust internal control and strong public financial management
F1. MANAGING RISK F2. MANAGING
PERFORMANCE
F3. ROBUST INTERNAL
CONTROL F4. MANAGING DATA F5. STRONG PUBLIC
FINANCIAL MANAGEMENT
1.1  Recognising that risk
management is an integral
part of all activities and must
be considered in all aspects
of decision making.
1.2  Implementing robust and
integrated risk management
arrangements and ensuring
that they are working
effectively.
1.3  Ensuring that responsibilities
for managing individual risks
are clearly allocated.
2.1  Monitoring service delivery
effectively including planning,
specification, execution, and
independent post-
implementation review. 
2.2  Making decisions based on
relevant, clear objective
analysis and advice pointing
out the implications and risks
inherent in the organisation’s
financial, social, and
environmental position and
outlook.
2.3  Ensuring an effective scrutiny
or oversight function is in
place which encourages
constructive challenge and
debate on policies and
objectives before, during and
after decisions are made
thereby enhancing the
organisation’s performance
and that of any organisation
for which it is responsible.
3.1  Aligning the risk
management strategy and
policies on internal control
with achieving objectives.
3.2  Evaluating and monitoring
risk management and
internal control on a regular
basis.
3.3  Ensuring effective counter
fraud and anti-corruption
arrangements are in place.
3.4  Ensuring additional
assurance on the overall
adequacy and effectiveness
of the framework of
governance, risk
management, and control is
provided by the internal
auditor.
3.5  Ensuring an audit committee
or equivalent group or
function which is independent
of the executive and
accountable to the governing
4.1  Ensuring effective
arrangements are in place for
the safe collection, storage,
use and sharing of data,
including processes to
safeguard personal data.
4.2  Ensuring effective
arrangements are in place
and operating effectively
when sharing data with other
bodies. 
4.3  Reviewing and auditing
regularly the quality and
accuracy of data used in
decision making and
performance monitoring.
5.1  Ensuring financial
management supports both
long-term achievement of
outcomes and short-term
financial and operational
performance.
5.2  Ensuring well-developed
financial management is
integrated at all levels of
planning and control,
including management of
financial risks and controls.
Page 43 of 108

Page 44

16 
OR (for a committee system)
Encouraging effective and
constructive challenge and
debate on policies and
objectives to support
balanced and effective
decision making.
2.4  Providing members and
senior management with
regular reports on service
delivery plans and on
progress towards outcome
achievement.
2.5  Ensuring there is consistency
between specification stages
(such as budgets) and post-
implementation reporting
(e.g. financial statements).
body: provides a further
source of effective assurance
regarding arrangements for
managing risk and
maintaining an effective
control environment, and that
its recommendations are
listened to and acted upon.
G. Implementing good practices in transparency, reporting, and audit to deliver effective accountability
G1. IMPLEMENTING GOOD PRACTICE IN
TRANSPARENCY G2. IMPLEMENTING GOOD PRACTICE IN REPORTING G3. ASSURANCE AND EFFECTIVE ACCOUNTABILITY
1.1  Writing and communicating reports for the public and
other stakeholders in an understandable style
appropriate to the intended audience and ensuring
that they are easy to access and interrogate.
1.2  Striking a balance between providing the right
amount of information to satisfy transparency
demands and enhance public scrutiny while not being
too onerous to provide and for users to understand.
2.1  Reporting at least annually on performance, value for
money, and the stewardship of its resources.
2.2 Ensuring members and senior management own the
results.
2.3  Ensuring robust arrangements for assessing the
extent to which the principles contained in the
Framework have been applied and publishing the
results on this assessment including an action plan
for improvement and evidence to demonstrate good
governance (annual governance statement). 
2.4  Ensuring that the Framework is applied to jointly
managed or shared service organisations as
appropriate.
2.5  Ensuring the performance information that
accompanies the financial statements is prepared on
a consistent and timely basis and the statements
allow for comparison with other similar organisations.
3.1  Ensuring that recommendations for corrective action
made by external audit are acted upon.
3.2  Ensuring an effective internal audit service with direct
access to members is in place which provides
assurance with regard to governance arrangements
and recommendations are acted upon.
3.3  Welcoming peer challenge, reviews and inspections
from regulatory bodies and implementing
recommendations.
3.4  Gaining assurance on risks associated with delivering
services through third parties and that this is
evidenced in the annual governance statement.
3.5  Ensuring that when working in partnership,
arrangements for accountability are clear and that the
need for wider public accountability has been
recognised and met. 
Page 44 of 108

Page 45

17 
Appendix B: North Lanarkshire Council local code of governance review programme 
This appendix aligns each of the specific elements and mechanisms which form the council’s local code of governance to the 7 principles (and 21 sub-principles) within the International Framework: Good Governance in the Public Sector
and the local government Delivering Good Governance in Local Government: Framework (2016).  These are detailed below along with hyperlinks to the relevant documentation, an update on the review timeframe and date of next update
(where appropriate), and an assessment of the current position.   
Based on this assessment each element and mechanism has been assigned a RAG status.  The use of this assessment process (and corresponding RAG status) aims to ensure all elements and mechanisms are as up to date as they
require to be, while providing a method by which to identify and prioritise items requiring to be reviewed and/or updated further.  Definitions supporting the RAG status are noted in the table below: 
RAG status Definition
Red The element or mechanism was last reviewed / updated prior to March 2020 and there is a requirement for an annual (or other regular frequency) review and/or update to be undertaken, or there has been a change in
legislation which necessitates a review and update, but either way no commitment has been identified from a Chief Officer to do so and, as such, there is a material impact on the council’s governance arrangements.
Amber  Although the element or mechanism has been reviewed and/or updated, this has not been carried out within the post pandemic environment to reflect any changes in service delivery or impacts on compliance with good
governance, or (while there is a commitment by a Chief Officer to carry out a review and/or update) there has been significant slippage in the timescale identified to do so.
Green The element or mechanism has been reviewed and/or updated since March 2020 and has been subject to an annual (or other regular frequency) review and/or update since then so there is no requirement for a further
update at this time, or a Chief Officer or the Business Management Team (BMT) / Corporate Management Team (CMT) has already identified that the item requires to be reviewed and/or updated during 2025/26. 
Elements and mechanisms in the North Lanarkshire Council local code of governance 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub-principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
Standing Orders
Local authorities are corporate bodies created by statute and must make corporate
decisions. Legislation allows local authorities to delegate most decision making to
committees, sub-committees, or officers. This means that committees only operate
within the remits given to them by their council. The Council has delegated certain
matters to committees, sub-committees and officers, and the Standing Orders set out
the rules which apply to the running and operation of Council and its committee
meetings. 
The latest update to the Standing Orders was in December 2024 when revisions were
approved at the Council meeting on 19th December 2024: link to file 
Standing Orders are published on the council’s website: link to file
Latest version: December 2024.
Review timeframe: Changes to Standing Orders
are led by Elected Members who can propose
amendments as they wish; these require approval at
a meeting of the Council prior to adoption.
Assessment: Standing Orders are subject to
regular review to determine if they remain fit for
purpose and to identify any revisions required to
further improve the efficient operation of the
council’s decision making process.  The latest
update to the Standing Orders was approved in
December 2024.
RAG: 
Chief Officer (Legal
and Democratic) ✓ ✓ ✓ ✓         ✓        
Financial Regulations and Scheme of Financial Delegation
Financial Regulations are an integral part of the council’s framework of internal
financial controls; these are designed to ensure the effective stewardship of the
council’s  funds. Compliance with these regulations will ensure that public money is
safeguarded and properly accounted for, and all council financial transactions are
undertaken in a manner which demonstrates openness, transparency, and integrity. 
The Financial Regulations form a key part of the overarching Financial Strategy and
the corporate governance arrangements of the council. 
• 2024 review of Financial Regulations and Scheme of Financial Delegation -
November 2024: link to file
• 2023 review of Financial Regulations and Scheme of Financial Delegation -
November 2023: link to file
• 2022 review of Financial Regulations and Scheme of Financial Delegation -
November 2022: link to file
Latest version: November 2024.
Review timeframe: An annual review process is in
place to ensure that both the Financial Regulations
and Scheme of Financial Delegation remain
appropriate for the effective stewardship of the
council’s financial resources.
Assessment: Financial regulations are subject to
regular review.  Key changes made to the Financial
Regulations following the most recent review in
November 2024, and the rationale for each change,
are listed in the accompanying committee report. 
RAG: 
Chief Officer
(Finance and
Technology)  
✓     ✓  ✓ ✓  ✓  ✓ ✓  ✓   
Scheme of Administration 
The Scheme of Administration provides the details and different functions of
committees and other groups of each council and the delegation of authority to carry
out the functions of the council.  It sets out the terms of reference for committees, sub-
committees, and panels of the council. 
At its meeting on 6th October 2022, the Council approved new governance
arrangements and the Scheme of Administration link to file 
At its meeting on 28th March 2024, the Council approved amendments to the Scheme
of Administration to reflect the organisational and structural changes agreed by the
Policy and Strategy Committee at its meeting on 7th December 2023, and to
streamline the oversight for Active and Creative Communities under the remit of a
Latest version: December 2024.
Review timeframe: The Scheme of Administration
is reviewed following every local government
election.  Officers and Elected Members can
propose amendments as they wish throughout each
term; these require approval at a meeting of the
Council prior to adoption.
Assessment: 
The latest update to the Scheme of Administration
was updated in December 2024.
RAG: 
Chief Officer (Legal
and Democratic)  ✓ ✓ ✓ ✓            ✓     
Page 45 of 108

Page 46

18 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub-principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
single committee. 
Following the organisational and structural changes agreed by the Policy and Strategy
Committee at its meeting on 26th September 2024, the Scheme of Administration was
updated in December 2024. 
Scheme of Administration is published on the council’s website: link to file 
Committee arrangements
Committee arrangements support the implementation of the Scheme of
Administration, for example through a timetable of meetings. 
At its meeting on 6th October 2022, the Council approved new governance
arrangements - including the timetable of meetings for 2022-27: link to file 
The council maintains a list of the membership of committees, sub-committees,
panels, working groups, and other bodies and any amendments to this are approved
through the Council meeting, the most recent updates in this respect were approved at
the council meeting on 27th March 2025: link to file
Latest version: December 2024.
Review timeframe: The Scheme of Administration
is reviewed following every local government
election.  Officers and Elected Members can
propose amendments as they wish throughout each
term; these require approval at a meeting of the
Council prior to adoption.
Assessment: 
The Scheme of Administration approved in October
2022 included a timetable of meetings up to 2027.
RAG: 
Chief Officer (Legal
and Democratic) ✓ ✓ ✓ ✓            ✓     
Scheme of Delegation to Officers
The Scheme of Delegation sets out the powers delegated by the Council to officers,
pursuant to the Local Government (Scotland) Act 1973.  The Scheme is intended to
facilitate the efficient conduct of council business by clearly setting out the nature and
extent of the powers delegated to officers by the Council.   
In exercising any delegated function, the nominated officer will take account of any
appropriate council practice or procedure, any managerial instruction given, and any
other similar consideration.   
The Scheme of Delegation to Officers is subject to:
1. The policies adopted by the council.
2. Appropriate provision for financial outlays having been made in the estimates for the
current year.
3. The right of an officer to consult with the Chief Executive on any matter or to refer
any matter to the appropriate committee or sub-committee of the council.
4. The obligation on the Chief Executive and on each Chief Officer to arrange
consultations with individual local Members on matters which affect their areas in all
cases in which the council practice or procedures so require.
5. The requirement that the Chief Executive and all Chief Officers observe the
principles of corporate management.
6. Statutory authority granted only to certain officers. 
• Updated Scheme of Delegation to Officers approved by the Council at its meeting
on 27th March 2025: link to file   
• A copy is available on the council’s website: link to file
Latest version: March 2025.
Review timeframe: As a matter of practice, the
Scheme of Delegation to Officers is reviewed
following any organisational change or restructure.
Assessment: As the council’s Monitoring Officer,
the Chief Officer (Legal and Democratic), has
delegated authority to update the Scheme of
Delegation to Officers as necessary in line with
statutory changes and organisational requirements.
Following the organisational and structural changes
at Policy and Strategy Committee in September
2024, the Scheme of Delegation to Officers was
updated accordingly and approved by the Council at
its meeting in March 2025.
RAG: 
Chief Officer (Legal
and Democratic) ✓ ✓ ✓ ✓         ✓   ✓     
Code of Conduct for Chief Officers
This provides a framework within which Chief Officers of the council are expected to
undertake their duties in a manner which meets the required standards for good
governance. 
• Code of Conduct for Chief Officers - updated in June 2024: link to file
• Code of Conduct for Chief Officers - updated in June 2023: link to file 
Amendments in 2023 were made to reflect latest organisational structural
arrangements.  In addition, sections 13 (police enquiries) and 17 (potential
conflicts of interest) were expanded to include more explicit wording in respect of
the particular requirements in these areas.
• Code of Conduct for Chief Officers - November 2017: link to file
Latest version: June 2024.
Review timeframe: As required based on
organisational changes and to reflect updates in
respect of legislation, best practice, and government
guidance.
Assessment: Amendments approved by Policy and
Strategy Committee in June 2024 related to written
responses to enquiries from MPs and MSPs
enquiries and, as such, it was agreed that the
following sentence be added at the end of
paragraph 7.5 of the Code: “Notwithstanding the
general rule set out in paragraph 7.3 above, written
responses to all MP and MSP enquiries must be
provided no later than 20 working days from the
date of receipt of the enquiry.” 
RAG:  
Chief Officer (Legal
and Democratic) ✓ ✓ ✓              ✓    
Chief Officers Register of Interests 
A process to register the interests of Chief Officers was implemented in November
2017: link to file 
To comply with this, Chief Officers are required to detail any other renumeration they
receive, property they may own, memberships of clubs and associations or any other
financial interests (for example directorships or shareholdings), they may have.  
Latest version: Registers and council website last
updated in April 2025.
Review timeframe: Annual.
Assessment: Annual process in place which is co-
ordinated by the Depute Monitoring Officer in Legal
and Democratic (as that postholder does not require
to register their interests within the Chief Officers
Chief Officer (Legal
and Democratic) ✓ ✓ ✓              ✓    
Page 46 of 108

Page 47

19 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub-principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3 
Registers are published on the council’s website:
https://www.northlanarkshire.gov.uk/your-council/how-council-works/chief-officers-
register-interests 
Register of Interests).
RAG: 
Statutory officer posts
• The post of head of paid service (the chief executive) was established under the
Local Government and Housing Act 1989 and is responsible to councillors for the
staffing of the council and ensuring the work in different departments is co-ordinated.
• The monitoring officer was established under the Local Government and Housing
Act 1989 and is responsible for ensuring that the council observes its governance
arrangements and operates legally.  This includes reporting on the legality of
matters, mal-administration, and the conduct of councillors and officers.
• The chief financial officer (section 95 officer or the senior financial officer) was
established under the Local Government (Scotland) Act 1973 and is responsible for
the financial affairs of the council.
• The chief social work officer was established under the Social Work (Scotland Act)
1968.  Councils are required to appoint a professionally qualified chief social work
officer to provide members and senior officers with effective, professional advice
about the delivery of social work services. 
There are also a number of other statutory posts across services in line with
legislation.
Latest version: Ongoing statutory obligation.
Review timeframe: N/A.
Assessment: All statutory posts are currently filled.
RAG:   
Chief Executive /
Chief Officer (Legal
and Democratic) /
Chief Officer
(Finance and
Technology) / Chief
Social Work Officer 
✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
Employee Code of Conduct
The Code of Conduct is the standard which is applicable to all employees. While Chief
Officers have additional responsibilities, and many other professions within the council
work to dedicated professional standards (e.g. teaching or social care), the Employee
Code of Conduct should be considered as the foundation of the high standards
applicable to all. An introduction and commitment from the Chief Executive reinforces
this view. 
• Employee Code of Conduct - February 2025: link to file 
• A mandatory eLearning module on the Employee Code of Conduct has been in
place since 2023 (this is accessible through LearnNL). Following a review of
completion rates and recertification periods by the Business Management Team in
April 2025, a NLC Announcement was issued to staff in May 2025 advising that the
recertification period for the Employee Code of Conduct module would move from
every 2 years to every 3 years.
Latest version: January 2025
Review timeframe: Since its implementation, the
Employee Code of Conduct has been regularly
reviewed to ensure it remains fit for purpose, and
over the last few years a mandatory training course
has been developed to ensure that all employees
understand and practice the principles and
standards of the code.
Assessment: As the last review took place in 2022,
a review in 2024 resulted in several amendments
and additions to the Employee Code of Conduct that
were agreed following consultation with senior
management of the council and the relevant Trade
Unions to ensure the Code remains fit for purpose.
The general intent to retain a consistent set of high
standards, applicable to all, has been maintained in
the updated Employee Code of Conduct, the report
(approved at Finance and Resources Committee in
February 2025) summarises the specific changes
and additions that have been made to the 2025
Employee Code of Conduct.
RAG: 
Chief Officer
(People Resources) ✓ ✓ ✓          ✓    ✓    
Conflicts of Interest Register
When an employee identifies a potential conflict of interest, they must complete the
relevant form after discussion with their line manager.  Employees must then submit
the form to their Chief Officer.  This must be done as soon as possible and within one
month of the conflict or potential conflict of interest. 
A new section on conflicts of Interest was first introduced to the Employee Code of
Conduct in May 2018.  The Employee Code of Conduct was most recently updated in
January 2025 (link to file) and this continues to reiterate employee responsibilities in
relation to conflicts of interest and outlines the necessity to comply with the relevant
reporting procedures. 
A Guidance document and templates are available on InsideNL: Conflicts of Interest
The guidance is reviewed annually in line with the Chief Officer’s Assurance
Statement and Checklist process. 
A NLC Announcement was issued in June 2025 advising of the updated Employee
Code of Conduct and reminding all employees of their obligations in respect of
conflicts of interest; this also provided links to the supporting guidance and employee
declaration form.
Latest version: March 2025.
Review timeframe: Annual.
Assessment: A process is in place whereby Chief
Officers are required to submit their up to date
Service Registers annually (as part of the Chief
Officer’s Assurance Statement and Checklist
process) for all their staff for independent review
and reporting to the BMT/CMT.  The annual
governance report to the BMT/CMT (in June 2025)
which covers the annual review of the Strategic
Governance Framework) provided an annual update
in this respect. 
RAG: 
All Chief Officers ✓ ✓ ✓              ✓    
Gifts and Hospitality Register
Employees are required to advise their line manager of any gifts or hospitality received
by them, or offered to them, in the course of their employment with the council.  After
discussing any gifts or hospitality received (or offered) with their line manager,
employees must complete and submit the relevant form to their Chief Officer.  This
Latest version: March 2025.
Review timeframe: Annual.
Assessment: A process is in place whereby Chief
Officers are required to submit their up to date
Service Registers annually (as part of the Chief
All Chief Officers ✓ ✓ ✓              ✓    
Page 47 of 108

Page 48

20 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub-principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
must be done as soon as possible and within one month of being offered the gift or
hospitality. 
Further details on what should be recorded were included in the updated version of
the Employee Code of Conduct in May 2018.  The Employee Code of Conduct was
most recently updated in January 2025 (link to file) and this continues to reiterate
employee responsibilities in relation to gifts and hospitality.  This updated version also
provides further guidance on what gifts are deemed reasonable to accept and outlines
the necessity to comply with the relevant reporting procedures. 
A Guidance document and templates are available on InsideNL: Gifts and Hospitality
The guidance is reviewed annually in line with the Chief Officer’s Assurance
Statement and Checklist process. 
A NLC Announcement was issued in June 2025 advising of the updated Employee
Code of Conduct and reminding all employees of their obligations in respect of gifts
and hospitality; this also provided links to the supporting guidance and employee
declaration form.
Officer’s Assurance Statement and Checklist
process) for all their staff for independent review
and reporting to the BMT/CMT.  The annual
governance report to the BMT/CMT (in June 2025)
which covers the annual review of the Strategic
Governance Framework) provided an annual update
in this respect.  
RAG:  
Councillors Code of Conduct
The Ethical Standards in Public Life etc. (Scotland) Act 2000 introduced a new ethical
framework for public life in Scotland. The Code of Conduct for Councillors came into
effect in May 2003.   
All Councillors elected to local authorities in Scotland must follow this statutory code of
conduct when carrying out their public duties.  This code is published on the council’s
website: https://www.northlanarkshire.gov.uk/your-council/councillors-and-
committees/your-councillor/councillors-code-conduct 
The Code of Conduct for Councillors is approved by the Scottish Parliament and
issued by Scottish Ministers.  The Standards Commission for Scotland is responsible
for the enforcement of the code of conduct. It also has responsibility for issuing
guidance to assist local authorities and councillors about the code of conduct and also
for hearing complaints about a councillor.  The latest code was published in December
2021:
https://www.standardscommissionscotland.org.uk/codes-of-conduct/ 
Latest version: December 2021.
Review timeframe: Review timeframes are set by
the Scottish Government as they are responsible for
setting the Councillors Code of Conduct.
Assessment: In 2020, the Scottish Government
held a consultation on a review of the Councillors'
Code of Conduct to seek views from relevant
stakeholders and members of the public.  The
council and the Standards Commission for Scotland
provided feedback as part of this exercise. 
Following this exercise, a new code was published
on 7th December 2021.
The new code and relevant guidance was shared 
with new and returning Elected Members in May
2022, with training provided on the content.
RAG:  
Chief Officer (Legal
and Democratic) ✓ ✓ ✓              ✓    
Councillors registered interests
Under The Ethical Standards in Public Life etc (Scotland) Act 2000 (Register of
Interests) Regulations 2003, Councillors and other committee members are required
to give notice of any registrable interests. 
The list of registrable interests for each Elected Member is updated on the Councillor’s
Information System and published on the council’s website:
https://www.northlanarkshire.gov.uk/your-council/councillors-and-committees/your-
councillor/councillors-registered-interests 
Latest version: Ongoing statutory obligation set out
in the Councillor’s Code of Conduct.
Review timeframe: Any changes to the process will
be advised nationally in line with the guidance
issued by the Standards Commission.
Assessment: Upon taking up their position as an
Elected Member, Councillors are required to give
notice to the Monitoring Officer of any registrable
interests at that point and for the previous 12
months.  Thereafter Elected Members are legally
required to inform the council’s Monitoring Officer of
any changes to their registrable interests within four
weeks of the change taking place.
Following the local government elections in May
2022 there was an obligation on every Elected
Member to complete and sign their register within 4
weeks of being elected.  
RAG: 
Chief Officer (Legal
and Democratic) ✓ ✓ ✓              ✓    
Declarations of interest
Standing agenda item number 1 on all agendas for Council and Committee meetings
is Declarations of Interest in terms of the Ethical Standards in Public Life Etc.
(Scotland) Act 2000. 
Any declarations made are recorded in the minutes.
Latest version: Ongoing statutory obligation set out
in the Councillor’s Code of Conduct.
Review timeframe: Any changes to the process will
be advised nationally in line with the guidance
issued by the Standards Commission.
Assessment: Agenda / minutes of all committee
meetings show declarations of interest are sought,
and appropriate declarations are made and
recorded.
RAG: 
Chief Officer (Legal
and Democratic) ✓ ✓ ✓             ✓ ✓    
Open and transparent decision making
Dedicated section on the council’s website provides the public with information on
each of the local Elected Members, the official council roles, minutes / agendas /
reports from committee meetings, standing orders, the scheme of administration, and
a link to webcasts of committee meetings.
Latest version: Live pages.
Review timeframe: Ongoing.
Assessment: Web pages continually updated as
and when new information becomes available. 
RAG: 
Chief Officer (Legal
and Democratic) ✓ ✓ ✓ ✓  ✓   ✓ ✓      ✓   ✓  
Page 48 of 108

Page 49

21 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub-principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3 
• Website: https://www.northlanarkshire.gov.uk/your-council/councillors-and-
committees 
Counter Fraud Policy
A Counter Fraud Policy is in place which sets out the council’s expectations (that
extend to all individuals and organisations with whom it deals) in terms of acting
honestly and with integrity and in safeguarding public resources. 
• Counter Fraud Policy - September 2023: link to file 
Latest version: September 2023.
Review timeframe: A review of the Corporate Anti-
Fraud Policy and Fraud Response Plan in June
2017, and an Internal Audit review in May 2020,
recommended that corporate anti-fraud policies and
arrangements in place at that time should be
reviewed and any identified actions necessary
should be implemented to ensure the council’s
arrangements are more fully consistent with
recognised good practice.
Assessment: As per an Internal Audit Corporate
Governance report to the Audit and Scrutiny Panel
in May 2023 [ link to file ], a management
commitment to review the council’s anti-fraud
arrangements (including a review of the policy) was
included in the 2022/23 Internal Audit annual plan. 
This review is now complete the revised Counter
Fraud Policy was approved by the Policy and
Strategy Committee in September 2023.
RAG: 
Chief Officer (Audit
and Risk) ✓ ✓ ✓             ✓     
Whistleblowing Procedure (Public Interests Disclosure)
The council’s Whistleblowing Procedure provides a mechanism for employees of the
council, and other workers within the council, to report a concern about serious
wrongdoing within the council and to do so with security and in confidence. 
• Whistleblowing Procedure (Public Interests Disclosure) - June 2024: link to file
• Whistleblowing Procedure (Public Interests Disclosure) - March 2023: link to file
• Whistleblowing Procedure (Public Interests Disclosure) - March 2022 (report says
2020 but it is the 2022 file): link to file
Latest version: June 2024.
Review timeframe: Annual.
Assessment: Review in June 2024 was undertaken
on the use of the Whistleblowing Procedure and to
identify any amendments required to the Procedure. 
The updated Procedure was approved at Policy and
Strategy Committee in March 2023.
The outcome of the latest annual review is
scheduled to be reported to committee later in 2025. 
RAG: 
Chief Officer (Legal
and Democratic) ✓ ✓ ✓             ✓     
Senior management team and supporting structure of meetings
This comprises of four aspects, as follows:
Business Management Team (BMT) - The role of the BMT is “To monitor the efficient
and effective operation of the council” and to secure the relevant assurances that “the
council is able to effectively pursue the long-term ambition set out in The Plan for
North Lanarkshire by ensuring this is underpinned with the relevant assurances and
controls in terms of corporate governance [including performance, legal, and hr
matters], risk management, and financial management.  This means the BMT role is
that of assurance, not directing or monitoring delivery unless the ongoing assessment
of assurance require improvement in this respect.  
Reflecting the changes to the council’s senior management team structure as outlined
in the annual governance update report (link to file) to committee in September 2024,
the Chief Executive, Depute Chief Executive, Section 95 Officer, and Monitoring
Officer are members of the Business Management Team as well as the Chief Officers
of Audit and Risk, People Resources, and Strategy and Engagement. 
Corporate Management Team (CMT) - The role of the CMT is “To consider the
strategic context and environment within which the council is operating, understand
the position of the organisation, and consider the future direction. To consider the
implementation of strategic decisions at a council wide level and the impact on the
delivery of The Plan for North Lanarkshire and Programme of Work. To agree the one
council approach required in order to deliver on the council’s priorities (in partnership
where required) in line with the strategic direction and monitor the delivery of the
Programme of Work.”   This means the CMT role has a focus on improvement in
delivering the council’s strategic priorities through the Programme of Work. 
The Chief Executive, Depute Chief Executive, and all other Chief Officers are
members of the CMT. 
4 x Service Management Teams (SMTs) - The One Place One Plan - Governance
update report in December 2023 reiterated the four service groupings which were
originally established in September 2018 and which have continued to operate
effectively since - Chief Executive’s services, Enterprise and Communities, Education
and Families, Adult Health and Social Care.
The focus for these four groups is to manage the operational delivery of service
remits.  They are also required to consider the implementation of strategic and
corporate decisions at a service and/or service grouping level and to consider the
Latest version: December 2022.
Review timeframe: As required.
Assessment: New arrangements for a single
integrated corporate forum for all Chief Officers
were implemented in April 2021.  A self-evaluation
exercise in 2022, to review the effectiveness of the
revised arrangements, concluded there was a clear
vision and effective leadership with a sound
approach that provides clear direction and several
aspects of the new arrangements were highlighted
as working well.  The combination of responding to
and recovering from the pandemic while resuming
business as usual activities at pace had however
intensified the volume of business that required to
be discussed by the senior management team of
the council which - along with the impact of
workforce pressures, industrial action, inflationary
pressures, the cost of living, external financial
pressures, and large scale public sector reform - 
significantly added to the agenda and to the risks
facing the council.  For this reason, new
arrangements comprising four aspects (BMT, CMT,
SMTs, OMT) were developed and implemented from
January 2023.
RAG: 
All Chief Officers ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
Page 49 of 108

Page 50

22 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub-principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
context within which the service / service grouping is operating and ensure decisions
made in terms of operational delivery are in line with, and support, the successful
delivery of the Programme of Work and The Plan for North Lanarkshire. 
Operational Management Team - formally established in April 2021, this forum
comprises all senior managers and head teachers across the council.  It operates
under the principles of engage, develop, support, and inform to connect managers and
enable them to strengthen and support their teams to deliver on the Programme of
Work in line with The Plan for North Lanarkshire.  The OMT aims to provide a
collaborative forum for discussions on the practical aspects of delivering the
Programme of Work.  This group is not a decision making body; it is an information
sharing forum.  Its focus is on providing opportunities to share and discuss significant
strategic and corporate developments with the wider operational management team
environment across the council.
The Plan for North Lanarkshire
The Plan for North Lanarkshire is a long-term strategy with a long-term vision which
was approved in February 2019.  This sets the direction for the council (and for work
with partners). 
• Update on level 1 health check indicators that provide the latest North Lanarkshire
context in terms of the economic, social, health, environmental wellbeing of the area
and also the latest context, challenges, and next steps, March 2025: link to file
• Update on level 1 health check indicators that provide the latest North Lanarkshire
context in terms of the economic, social, health, environmental wellbeing of the
area, March 2024: link to file
• Update on level 1 health check indicators that provide the latest North Lanarkshire
context in terms of the economic, social, health, environmental wellbeing of the
area, March 2023: link to file
• Update on level 1 health check indicators and progress against Programme of Work,
March 2022: link to file
• Place based regeneration investment programme of work - The Place The Vision,
September 2021: link to file
• Update on level 1 health check indicators and progress against Programme of Work,
March 2021: link to file
• Place based regeneration investment programme of work - March 2020: link to file
• The Plan for North Lanarkshire, February 2019: link to file 
• The Plan for North Lanarkshire is published on the council’s website:
https://www.northlanarkshire.gov.uk/your-council/council-strategies-and-
plans/council-strategies/plan-north-lanarkshire 
Latest version: The Plan for North Lanarkshire is a
long-term strategy with a long-term vision which was
approved in February 2019. 
Review timeframe: Annual.
Assessment: The Plan for North Lanarkshire is
supported by a suite of high level Health Check
Performance Indicators that collectively provide the
context for North Lanarkshire as a place.  These are
reviewed, updated, and reported to the Policy and
Strategy Committee annually to enable an
assessment of progress and to inform the council’s
strategic planning process through the Programme
of Work.
The Programme of Work is the delivery mechanism
for The Plan for North Lanarkshire; this is reviewed
and updated annually.  
RAG:  
Chief Executive  ✓    ✓  ✓ ✓  ✓     ✓      
Programme of Work
The Programme of Work is the delivery vehicle for The Plan for North Lanarkshire.  
Its purpose is to translate the vision into priorities for action. 
• Six monthly update on delivery of the Programme of Work - March 2025: link to file
• The latest North Lanarkshire context, challenges, and next steps - March 2025: link
to file
• Six monthly update on delivery of the Programme of Work - September 2024: link to
file
• Programme of Work to 2028 Delivery Plan - March 2024: link to file
• Programme of Work to 2028 approved in March 2023: link to file 
Latest version: Programme of Work to 2028
approved in March 2023; Delivery Plan in March
2024.
Review timeframe: Annual review and update in
respect of achievements and latest context in cycle
1 each year.
Assessment: The Programme of Work to 2028 was
approved at the Policy and Strategy Committee in
March 2023; this was followed by the supporting
delivery plan in March 2024. As per the commitment
set out in the March 2024 report, a six monthly
update on the delivery of the Programme of is
provided to the Policy and Strategy Committee to
support their role in relation to “development, co-
ordination, and monitoring of The Plan for North
Lanarkshire” and to keep under review such
“programmes as the Committee considers
necessary to achieve the council’s long-term aims
and objectives”.
The Programme of Work to 2028 is supported by a
governance framework which sets out, inter alia,
roles and responsibilities, alignment across other
corporate processes, and the corresponding
monitoring, reporting, controls, and quality
assurance arrangements.  
The latest six monthly update on the delivery of the
Programme of Work was reported to Policy and
Strategy Committee in March 2025; the next is due
in cycle 3 of 2025. 
As per the report to Policy and Strategy Committee
in March 2025, a mid-term review of the Programme
Chief Executive ✓    ✓  ✓ ✓  ✓     ✓ ✓     
Page 50 of 108

Page 51

23 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub-principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
of Work is underway in light of the latest context and
challenges; this is scheduled to be reported back to
Committee in cycle 4 of 2025.
RAG: 
Strategic Policy Framework
Initially approved in September 2018, the Strategic Policy Framework sits alongside
the Programme of Work in the council’s strategic planning process to ensure that
strategy and policy remain connected to delivery in support of the shared ambition and
priorities set out in The Plan for North Lanarkshire.   
The Strategic Policy Framework sets out the high-level strategies, policies, and plans
which are subject to a formal review process to ensure they remain fit for purpose and
continue to align to the strategy of the council as well as relevant local and national
strategy, policy, and legislative contexts.  The Framework also aims to ensure that
strategies, policies, and plans are formulated, developed, implemented, monitored,
and reviewed in a consistent and transparent manner. 
• Refreshed Strategic Policy Framework approved in March 2024: link to file
• Refreshed Strategic Policy Framework approved in March 2023: link to file
• Refreshed Strategic Policy Framework approved in March 2022: link to file
• Inaugural Strategic Policy Framework approved in September 2018: link to file 
• Update provided to the Audit and Scrutiny Panel in October 2024: link to file
• Update provided to the Audit and Scrutiny Panel in November 2023: link to file
• Update provided to the Audit and Scrutiny Panel in November 2022: link to file
• Update provided to the Audit and Scrutiny Panel in September 2021: link to file
• Update provided to the Audit and Scrutiny Panel in September 2020: link to file
Latest version: Most recent update following
annual review and refresh process was approved at
committee in March 2024.
Review timeframe: Annual.
Assessment: The Strategic Policy Framework is
key in supporting the council’s Programme of Work
and, as such, is subject to an annual review and
refresh process to ensure the council’s strategies,
policies, and plans are kept up to date, aligned to
The Plan for North Lanarkshire, and reflect relevant
policy and legislation changes.  
Traditionally the Policy and Strategy Committee
have received an update to the Strategic Policy
Framework in cycle 1 each year at the same time as
the suite of Programme of Work reports. As the
Strategic Policy Framework is now well established
and aligned to The Plan for North Lanarkshire, any
significant changes from year to year are captured
in the Programme of Work as a matter of course. To
ensure ongoing alignment though, any key points
arising from the policy framework review
programme will be reflected within the
aforementioned mid-term Programme of Work
review.
RAG: 
Chief Officer
(Strategy and
Engagement)
✓    ✓  ✓ ✓  ✓     ✓ ✓     
Strategic Performance Framework
The Strategic Performance Framework sets out performance measurement at three
levels in order to collectively provide an overview of performance (over time and
compared to targets) to help understand the impact of council activities on improving
services and outcomes for the people and communities of North Lanarkshire.  These
measures also allow for day to day activities, and progress towards achieving the
long-term vision set out in The Plan for North Lanarkshire, to be regularly monitored,
reported, assessed, and scrutinised. 
• Update provided to the Audit and Scrutiny Panel in October 2024: link to file
• Update provided to the Audit and Scrutiny Panel in November 2023: link to file
• Update provided to the Audit and Scrutiny Panel in November 2022: link to file
• Update provided to the Audit and Scrutiny Panel in September 2021: link to file
Update provided to the Audit and Scrutiny Panel in September 2020: link to file
Latest version: October 2024.
Review timeframe: Annual.
Assessment: The Strategic Performance
Framework is key in supporting the council’s
Programme of Work and, as such, is subject to a
regular review and refresh process to ensure it
remains aligned to The Plan for North Lanarkshire.  
An update on all six of the strategic frameworks is
provided to the Audit and Scrutiny Panel annually.
The Strategic Performance Framework is supported
by a Performance Reporting Schedule which is
updated and reported to the Audit and Scrutiny
Panel annually.
The Strategic Performance Framework is currently
undergoing a review and update in line with the new
Programme of Work to 2028 and its Delivery Plan
priorities, with a view to supporting Programme of
Work progress and performance reporting.
RAG:  
Chief Officer
(Strategy and
Engagement)   
✓   ✓   ✓  ✓   ✓  ✓    
Strategic Performance Framework - performance reporting schedule
Formal reporting arrangements are in place through an annual Performance Reporting
Schedule that comprises Chief Officer reviews at service committees and service
specific reporting to meet both business and statutory obligations.  This is
underpinned by five non-negotiable standards that inform a regular performance
assurance review process. 
A summary of the council’s performance reports (in line with the Performance
Reporting Schedule) is provided quarterly to the Audit and Scrutiny Panel through a
performance assurance review which aims to support the Panel in maintaining
strategic oversight and awareness of the council’s performance reporting
arrangements in line with the Panel’s remit to provide “independent review of the
council’s governance, risk management, performance, and control frameworks”. It also
supports the council in demonstrating compliance with the Accounts Commission
Statutory Direction and it supports the Audit and Scrutiny Panel’s governance and
accountability role in terms of ensuring the council can demonstrate Best Value
through the existence of robust arrangements for performance reporting and scrutiny. 
Through this process the Panel are able to identify any significant issues arising which
require additional scrutiny and a further report to be submitted from the respective
Chief Officer to a future meeting of the Panel (following review through the Scrutiny
Latest version: February 2024.
Review timeframe: Annual.
Assessment: The annual performance reporting
schedule includes a list of Chief Officer reviews at
service committees and service specific reporting to
meet both business and statutory obligations
scheduled for each committee cycle each year. 
This schedule notes that it is an indicative schedule
prepared as at the time it is prepared and that
matters arising throughout the year may impact on
expected reporting dates.  An update to the
reporting schedule is expected to be submitted to
the Audit and Scrutiny Panel in cycle 3 of 2025; this
will include due consideration of the impact of the
newly published Accounts Commission Statutory
Direction for 2025/26 to 2027/28.
A performance assurance review process is in place
which assesses the reports on the schedule against
the five non-negotiable standards; this is reported to
the Audit and Scrutiny Panel on a quarterly basis.
Chief Officer
(Strategy and
Engagement) / 
all Chief Officers   
✓   ✓   ✓  ✓   ✓  ✓ ✓  ✓ 
Page 51 of 108

Page 52

24 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub-principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
Assessment and Prioritisation Process). 
• Performance Reporting Schedule reported to the Audit and Scrutiny Panel in
February 2024: link to file 
• Latest quarterly performance assurance review, May 2025: link to file 
The Assessment and Prioritisation Process approved by the Panel in August 2018 and
subsequently updated in September 2022 provides a mechanism by which items,
functions, or activities requiring scrutiny can be identified and submitted by Panel
Members.  This process is applied when assessing and prioritising each proposed
area of activity or issue put forward by Panel Members.  It allows for the relative merits
of each issue brought forward by Panel Members to be assessed objectively, thus
making the approach to determining whether an issue is appropriate for inclusion in
the Scrutiny Work Programme clear and transparent. 
• Latest scrutiny work programme and Assessment and Prioritisation Process -
February 2025: link to file
RAG:  
Strategic Governance Framework
The Strategic Governance Framework brings the principles of good governance (in
line with the Delivering Good Governance in Local Government: Framework (2016))  
together with legislative requirements and management processes by which the
council is directed and controlled and through which it is accountable to, engages with,
and leads the local community.  This aims to ensure the council is able to effectively
pursue the long-term ambition set out in The Plan for North Lanarkshire, while
ensuring this is underpinned with control and the management of risk, and:
• Resources are directed in accordance with agreed policies and according to
priorities and in line with corporate project management procedures.
• There is sound and inclusive decision making.
• There is clear accountability for the use of those resources in achieving defined
outcomes for service users and local communities. 
• Refreshed Strategic Governance Framework approved in June 2024: link to file
• Refreshed Strategic Governance Framework approved in June 2023: link to file
• Refreshed Strategic Governance Framework approved in September 2022: link to
file
• Refreshed Strategic Governance Framework approved in September 2021: link to
file
• Initial Strategic Governance Framework approved in February 2020: link to file 
• Update provided to the Audit and Scrutiny Panel in October 2024: link to file
• Update provided to the Audit and Scrutiny Panel in November 2023: link to file
• Update provided to the Audit and Scrutiny Panel in November 2022: link to file
• Update provided to the Audit and Scrutiny Panel in September 2021: link to file
• Update provided to the Audit and Scrutiny Panel in September 2020: link to file
Latest version: Most recent update following
annual review and refresh process was approved at
the Audit and Scrutiny Panel in June 2024.
Review timeframe: Review and update undertaken
annually in order to provide evidence to inform the
production of the Annual Governance Statement.
Assessment: The Strategic Governance
Framework is key in supporting the council’s
Programme of Work and, as such, is subject to an
annual review and refresh process to ensure
ongoing alignment to The Plan for North
Lanarkshire, and to inform the production of the
Annual Governance Statement.  The next annual
review and update of the Strategic Governance
Framework is scheduled to be reported to the Audit
and Scrutiny Panel in June 2025.
RAG:  
Chief Officer
(Strategy and
Engagement)
✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
Annual Governance Statement
The council is required to produce an Annual Governance Statement each year in line
with the Delivering Good Governance in Local Government: Framework (2016).  
This requires to be included in the annual accounts each year in line with The Local
Authority Accounts (Scotland) Regulations 2014. 
• Annual Governance Statement 2023/24 reported to the Audit and Scrutiny Panel
in June 2024: link to file
• Annual Governance Statement 2022/23 reported to the Audit and Scrutiny Panel
in June 2023: link to file
• Annual Governance Statement 2021/22 reported to the Audit and Scrutiny Panel
in September 2022: link to file (with there being no council committees held in
cycle 2 of 2022, it was permitted to submit the Statement to the next available
committee meeting).
• Annual Governance Statement 2020/21 reported to the Audit and Scrutiny Panel
in June 2021: link to file
• Annual Governance Statement 2019/20 reported to the Audit and Scrutiny Panel
in September 2020: link to file
Latest version: Annual Governance Statement for
2023/24 reported to the Audit and Scrutiny Panel in
June 2024.
Review timeframe: Annual.
Assessment: Annual Governance Statement for
2024/25 is scheduled to be presented to BMT/CMT
June 2025 to allow for inclusion in unaudited Annual
Accounts for 2024/25 and submission to external
auditors by end June 2025.  
The Annual Governance Statement for 2024/25 is
thereafter scheduled to be reported to the Audit and
Scrutiny Panel in June 2025.
RAG: 
Chief Executive /
Chief Officer
(Strategy and
Engagement)
✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
Project Management Framework 
Through the basic principles of good project management and good governance, the
council’s Project Management Framework aims to ensure a systematic approach
across the organisation by providing a corporate framework and guidance that
enables each stage of delivery towards achieving the overall objectives of a project to
be planned, guided, implemented, and governed. 
• Project Management Framework and templates on InsideNL: Project Management
Latest version: New Framework launched council
wide in December 2022, with a subsequent update
in June 2024.
Review timeframe: Every two years.
Assessment: The Project Management Framework
is key in supporting the council’s Programme of
Work and, as such, is subject to a regular review
and refresh process to ensure ongoing alignment to
Chief Officer
(Strategy and
Engagement)   
✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓  ✓  ✓     
Page 52 of 108

Page 53

25 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub-principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
Framework 
Good practice recommends that a council's audit and scrutiny committee play an
important role in providing independent assurances about the delivery of major
programmes and projects.  As such, quality assurance arrangements have been
implemented that form part of the work programme for the Scrutiny function of the
Audit and Scrutiny Panel to ensure an independent strategic oversight and assurance
process. The Panel’s role in this respect is to be assured that suitable review
procedures have been adopted so that the council can gain the relevant assurances
about the value of independent reviews that are undertaken during the project life
cycle.
• Quality Assurance for the Project Management Framework and Programme of Work
- annual Audit and Scrutiny Panel review - February 2025: link to file
• Quality assurance arrangements for the Project Management Framework and the
Programme of Work and the role of the Audit and Scrutiny Panel - February 2024:
link to file 
• Update provided to the Audit and Scrutiny Panel in October 2024: link to file
• Update provided to the Audit and Scrutiny Panel in November 2023: link to file
• Update provided to the Audit and Scrutiny Panel in February 2023: link to file
• Update provided to the Audit and Scrutiny Panel in November 2022: link to file
The Plan for North Lanarkshire.  Since the launch of
the new Project Management Framework in
December 2022, a number of developments arose
arisen that necessitated a review and update to the
Framework in 2024 to ensure it continues to remain
fit for purpose and that the council’s approach to
project management remains current, relevant, and
deliverable.  This included the need to reflect
feedback received through the project management
training programme, reiterate the requirement to
undertake a post project evaluation, ensure
alignment to the new Quality Assurance
arrangements and the role of the Audit and Scrutiny
Panel therein, incorporate the gateway check
process from the Invest in North Lanarkshire
Programme of Work, ensure Data Protection Impact
Assessments (DPIAs) are given due consideration
at the beginning (not the end) of a project, ensure
ongoing alignment of the impacts in the report
template with the Project Brief and Project Business
Case, ensure that project management and change
management work together to support delivery of
the Programme of Work to 2028, and reflect, where
required, the governments arrangements for the
Programme of Work to 2028. 
Quality assurance arrangements have been
developed to support the Programme of Work and
use of the Project Management Framework.  This
includes a key role for the Audit and Scrutiny Panel
for which the initial outline was reported to the Panel
in February 2024, with an annual report provided
thereafter in February 2025.
RAG: 
Strategic Self-Evaluation Framework
The Strategic Self-Evaluation Framework and rolling Review Programme provides the
council with a single strategy for improvement in this respect. Self-evaluation
exercises undertaken in line with the Framework are specifically designed to be
strategic but lite touch, and consistent but flexible, to ensure that these are tailored to
the service, function, project, or group being evaluated and designed within the
context of that operating environment. More importantly, items on the rolling Review
Programme aim to ensure a mechanism is in place to assess the council’s functions
and activities and identify areas for improvement within the context of fulfilling the
vision set out in The Plan for North Lanarkshire. 
• Update on future updates included in the scrutiny work programme - February 2025:
link to file
• Refreshed Strategic Self-Evaluation Framework was presented to the Audit and
Scrutiny Panel in February 2024: link to file
• Refreshed Strategic Self-Evaluation Framework was presented to the Audit and
Scrutiny Panel in November 2022; this includes the corporate process for options
appraisal: link to file
• Refreshed Strategic Self-Evaluation Framework was presented to the Audit and
Scrutiny Panel in September 2021: link to file
• Approved in February 2019: link to file 
• Update provided to the Audit and Scrutiny Panel in October 2024: link to file
• Update provided to the Audit and Scrutiny Panel in November 2023: link to file
• Update provided to the Audit and Scrutiny Panel in November 2022: link to file
• Update provided to the Audit and Scrutiny Panel in September 2021: link to file
• Update provided to the Audit and Scrutiny Panel in September 2020: link to file
Latest version: Refreshed Strategic Self-Evaluation
Framework and rolling review programme was
presented to the Audit and Scrutiny Panel in
February 2024 with an update reported thereafter in
October 2024 and in the scrutiny work programme
report in February 2025.
Review timeframe: Annual. 
Assessment: The Strategic Self-Evaluation
Framework is key in supporting the council’s
Programme of Work and, as such, is subject to an
annual review and refresh process to ensure
improvement actions remain aligned to The Plan for
North Lanarkshire.  
An update in respect of the Strategic Self-Evaluation
Framework rolling review programme will be
included in the annual frameworks position
statement report to the Audit and Scrutiny Panel
scheduled for cycle 4 each year.
RAG: 
Chief Officer
(Strategy and
Engagement)
✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
Local Government Benchmarking Framework (LGBF)
The LGBF brings together a wide range of information about how all Scottish councils
perform in delivering services to local communities.  It is a high-level benchmarking
tool designed to help senior management teams and Elected Members ask questions
about key council services. 
The LGBF reflects a commitment by SOLACE (Scotland) and COSLA to develop
better measurement and comparable data in order to help councils improve services,
target resources to areas of greatest impact and enhance public accountability.
As such, since 2010-11, all Scottish local authorities have worked together to report
Latest version: National web portal last updated in
April 2025.
Review timeframe: Annual publication of data by
the Improvement Service.  From 2023 onwards, the
LGBF web portal is being updated four time a year
when new data becomes available for indicators.
Assessment: The national web portal and
Dashboard are available from the council’s website;
this provides access to all the benchmarking
indicators within the LGBF and allows for
Chief Officer
(Strategy and
Engagement)   
✓        ✓   ✓  ✓   ✓ 
Page 53 of 108

Page 54

26 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub-principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
(through the LGBF) standard information on the services they provide. This
information takes the form of indicators that measure aspects of performance (for
example, how much a service costs per user or how satisfied local people are with a
service) across all areas of local government activity. 
The LGBF provides high-level information designed to encourage councils to examine
why variations in cost and performance are occurring between similar councils. The
framework itself does not supply the answers. That happens as councils engage with
each other to drill down and explore why these variations are happening. 
The national LGBF web portal is available from the council’s website: 
https://www.northlanarkshire.gov.uk/your-council/performance-of-the-
council/comparing-our-performance  
comparisons with other local authorities, family
group averages, and national averages.  
From January 2023, the council’s performance in
the LGBF indicators has been incorporated into
each Chief Officers regular Strategic Performance
Framework reports to service committees. 
RAG:  
Financial Strategy 
As the overarching framework that establishes the financial strategies and policies
which ensure effective financial governance, planning, and management, this sets out
the responsibility for safeguarding public funds within North Lanarkshire Council and
the role of the Section 95 Officer.   
The strategies and policies covered by the Financial Strategy are the Capital Strategy,
Treasury Management Strategy, Revenue Budget Strategy, Medium-Term Financial
Plan, and the Financial Regulations and Scheme of Financial Delegation. 
• Financial Strategy - June 2019: link to file
Latest version: April 2024.
Review timeframe: The strategies and policies
covered by the Financial Strategy are set out therein
along with timescales for further review.  All have an
annual review frequency.
Assessment: All strategies and policies covered by
the Financial Strategy are shown separately in this
table.  The Financial Strategy itself was reviewed in
August 2022 and, as reported to the CMT, it was
concluded that the Strategy remains relevant in its
current form and therefore no further update
requires to be reported to committee at this time. 
Following a further review in April 2024, this remains
the case.  
RAG: 
Chief Officer
(Finance and
Technology)  
✓     ✓  ✓ ✓  ✓  ✓ ✓  ✓   
Treasury Management Strategy 
Each year, in line with the CIPFA Code of Practice on Treasury Management, the
council produces a Treasury Management Strategy. The Treasury Strategy Statement
sets out the policies, practices, and activities undertaken by the council in compliance
with the Code.  It covers the council’s debt and investment projections, expected
movement in interest rates, council borrowing and investment strategies, policy on
repayment of loans funds advances, and treasury management and prudential
indicators.
• Treasury Management Strategy - February 2025: link to file
• Treasury Management Strategy - February 2024: link to file
• Treasury Management Strategy - March 2023: link to file 
• Treasury Management Strategy - March 2022: link to file 
Treasury Management monitoring reports are submitted to committee quarterly.  This
fulfils the requirements in accordance with the CIPFA Code of Practice on Treasury
Management and the CIPFA Prudential Code for Capital Finance in Local Authorities.
It informs on Treasury Management activity for the latest quarter and compliance with
the mandatory treasury and prudential indicators.  
• Quarter ended 31 March 2025 as at May 2025: link to file   
The Treasury Management Annual Activity report also fulfils the key requirements in
accordance with the CIPFA Code of Practice on Treasury Management and the CIPFA
Prudential Code for Capital Finance in Local Authorities in that it outlines the treasury
management activity undertaken during the latest financial year and the resulting
impact on the council’s borrowing and investment strategy.  It also reports on the
council’s performance in complying with the mandatory prudential indicators, and
provides a detailed summary of performance, making reference to those targets and
prudential indicators set at the start of the year within the approved strategy.  
• Annual activity report for 2023/24 - September 2024: link to file
• Annual activity report for 2022/23 - September 2023: link to file
• Annual activity report for 2021/22 - September 2022: link to file
• Annual activity report for 2020/21 - September 2021: link to file
Latest version: February 2025.
Review timeframe: Annual.
Assessment: The latest version of the Treasury
Management Strategy approved in February 2025
covers the period for 2025/26 and includes the
Treasury Management Indicators and Prudential
Indicators 2025/26 to 2029/30.  This report fulfils the
key requirements of the Local Government Act 2003
in that it outlines the Treasury Management Strategy
for 2025/26 in accordance with the CIPFA Code of
Practice on Treasury Management, and reports on
the treasury and prudential indicators as required by
the above code and the CIPFA Prudential Code for
Capital Finance in Local Authorities.
RAG: 
Chief Officer
(Finance and
Technology)  
✓     ✓  ✓ ✓  ✓  ✓ ✓  ✓   
Reserves Policy
To support the commitments made by both the Financial Strategy and Revenue
Resources Budget Strategy, a Reserves Policy was approved in January 2020.  The
Revenue Budget Strategy (a key element of the overarching Financial Strategy) states
that consideration will continue to be given to the planned, sustainable use of available
balances. The Reserves Policy addresses this commitment, ensuring available
balances are managed and utilised in accordance with effective governance
principles, and continue to support financial plans which are affordable and
sustainable. 
The policy is subject to annual review to ensure available balances are managed and
Latest version: January 2020.
Review timeframe: Annual.
Assessment: The Reserves Policy was approved in
January 2020.  The annual review process since
has identified no further changes and concluded
that the original Reserves Policy remains valid. 
However, given the scale of financial sustainability
risk it is the intention to conduct a more significant
review of the policy during the course of 2025/26.  
RAG:
Chief Officer
(Finance and
Technology)  
✓     ✓  ✓ ✓  ✓  ✓ ✓  ✓   
Page 54 of 108

Page 55

27 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub-principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
utilised in accordance with effective governance principles and continue to support
financial plans which are affordable and sustainable. Any significant amendments to
the policy are reported to committee. Since the Reserves Policy was approved in
January 2020 the annual review process since has identified no further changes and
concluded that the original Reserves Policy remains valid. 
• Reserves Policy - January 2020: link to file 
Revenue Budget Strategy
To facilitate a more strategic approach to establishing budgets and associated savings
options, a Revenue Resources Budget Strategy was approved in June 2019. This set
out the rationale for the development of a revised approach to budgeting and the
identification of future savings.  It sets out guiding principles and an outline framework
to develop the Strategy to ensure alignment with The Plan for North Lanarkshire.
• June 2019: link to file 
Now known as the Revenue Budget Strategy, it has been reviewed and updated
annually since:
• June 2024: link to file
• September 2022: link to file 
• June 2021: link to file
• June  2020: link to file 
Regular update reports on the implementation of savings are provided:
• Review of 2024/25 to 2026/27 budget savings - February 2025: link to file
• Review of 2024/25 to 2026/27 budget savings - September 2024: link to file
• Review of 2023/24 to 2025/26 budget savings - February 2024: link to file
• Review of 2023/24 to 2025/26 budget savings - September 2023: link to file 
A Discretionary Fees and Charges Policy was developed and approved in September
2023. This aims to annually uplift discretionary fees and charges to support the
implementation of one of the key principles of the approved Revenue Budget Strategy
which is that “Future charging models for services provided will be informed by
benchmarking and the principles of full cost recovery. Once costs are established on
this basis, future increases will be index-linked. Additionally, consideration will be
given to appropriate revenue generating opportunities”. The policy also contains
guidance which will ensure compliance with The Consumer Contracts (Information,
Cancellation and Additional Charges) Regulations 2013.
• Discretionary Fees and Charges Policy - September 2023: link to file
Latest version: June 2024.
Review timeframe: Annual.
Assessment: The Revenue Resources Budget
Strategy was approved in June 2019, with an
update provided annually thereafter given the
significantly increased financial risks faced by the
council.  
The report in June 2024 provides an update on the
implementation of the key principles and framework
of the Revenue Budget Strategy approved by
Committee in June 2019, which have underpinned
decision making, ensuring elected members have
information to assist them in making robust and
financially sustainable decisions in setting a
balanced budget. While the existing strategy is
based on sound principles, a review to consider
further development of the key principles has been
undertaken to ensure the council continues to
develop strategic, robust, and sustainable solutions
to manage the longer term financial challenges.
In presenting the Medium-Term Financial Plan to
Policy and Strategy Committee in June 2025, the
Section 95 Officer confirmed a further high-level
review of the Revenue Budget Strategy had been
completed and no further updates were required at
this time.  The next review is scheduled to be
presented to the Policy and Strategy Committee in
June 2026.
An update is scheduled to be provided to Finance
and Resources Committee in cycle 3 of 2025 on the
implementation of savings.
RAG: 
Chief Officer
(Finance and
Technology)  
✓     ✓  ✓ ✓  ✓  ✓ ✓  ✓   
4-weekly revenue monitoring reports
The council’s revenue budget is subject to close monitoring throughout the financial
year, with service’s reporting their own position to their relevant Service Committees
and Service Management Teams. 
A council summary report is prepared on a 4-weekly basis and consolidates the
budget monitoring position of all General Fund Services, along with the Housing
Revenue Account, and Adult Health and Social Care and, during 2025/26, will also
include summary financial information on the council’s subsidiary companies.  This
report highlights and explains major variances as per the council’s approved Financial
Regulations and is reported to both the BMT and committee.  Revenue monitoring
reports are standing items on the BMT agenda.
• Latest - Revenue monitoring report council summary 1 April 2024 to 28 February
2025 (Period 12), May 2025: link to file 
A consolidated council annual provisional outturn Revenue monitoring report is
provided to BMT each year.  This updates BMT on the overall position for the General
Fund Account, Housing Revenue Account, and Adult Health and Social Care for the
financial year just ended.   
The council summary report is supported by individual service reports which are
reported to Service Committees / Service Management Teams.  These reports include
analysis of significant budget variations, budget savings, and earmarked reserves.   
An Annual Accounts final outturn is reported to committee each year after the
completion of the draft accounts.
• Annual Outturn - September 2024: link to file 
Latest version: Period end report in May 2025 and
annual report for 2023/24 in September 2024.
Review timeframe: As at each period end and as at
the year end.
Assessment: Revenue budget monitoring reports
are submitted to committees each cycle throughout
the year and at the year end.
RAG: 
Chief Officer
(Finance and
Technology)  
✓     ✓  ✓ ✓  ✓  ✓ ✓  ✓   
Annual Revenue Budget and Council Tax 
The statutory requirements in relation to budget setting are contained within Section
93 of the Local Government Finance Act 1992.  An annual report provides financial
Latest version: February 2025.
Review timeframe: Annual.
Assessment: Report approved in February 2025
Chief Officer
(Finance and
Technology)  
✓     ✓  ✓ ✓  ✓  ✓ ✓  ✓   
Page 55 of 108

Page 56

28 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub-principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
information to enable the council to set its Revenue Budget and Council Tax for the
year. 
• February 2025: link to file
set the Revenue Budget and Council Tax for
2025/26 and outlined the updated forecast budget
position for 2025/26 to 2027/28.
The principle of setting a three year (rolling) budget
is key in supporting the council’s Programme of
Work and, as such, is scheduled for a report to
Council in cycle 1 in each year.
RAG: 
Medium-Term Financial Plan
Longer term planning is integral to the council’s Financial Strategy and the strategic
approach to budgeting. Effective decision making relies on strong financial planning
and the Medium-Term Financial Plan assists in ensuring resources are aligned to the
key priorities outlined in The Plan for North Lanarkshire and ensures the Programme
of Work is robust, affordable, and sustainable.  The Medium-Term Financial Plan
reflects the risks which may impact on the council’s ability to continue to provide high
quality services focussing on the strategic priorities. 
The Medium-Term Financial Plan was approved at committee in September 2019, this
is a 5 year rolling plan and, as such, the plan has subsequently been reviewed and
updated annually:
• June 2025: link to file
• June 2024: link to file
• June 2023: link to file
• September 2022: link to file 
Taking the previously reported position as the new baseline, the latest plan on the key
financial planning assumptions focussing on those factors which have the greatest
potential to impact the council’s forecast financial position in the medium term. This
includes future revenue grant funding, pay and non-pay inflation. A range of risk-
based scenarios have been considered, resulting in envisaged, pessimistic and
optimistic positions.
Latest version: June 2025.
Review timeframe: Annual.
Assessment: The Medium-Term Financial Plan
approved in June 2025 covers the period 2026/27 to
2030/31. This provides an update on the five-year
financial forecast and outlines the challenges facing
the council in maintaining medium-term financial
stability, while achieving the strategic priorities of the
council.
The Medium-Term Financial Plan is key in
supporting the council’s Programme of Work and, as
such, a review is undertaken each year of the
planning assumptions therein and the scenarios
relating to the anticipated budget position are
updated annually.
RAG: 
Chief Officer
(Finance and
Technology)  
✓     ✓  ✓ ✓  ✓  ✓ ✓  ✓   
Capital Strategy
Following the publication of the revised Prudential Code for Capital Finance in Local
Authorities 2021, there is a requirement for councils to produce a Capital Strategy. 
The Capital Strategy for 2024/25 to 2028/29 was approved in March 2024: link to file 
The Capital Strategy 2024/25 to 2028/29 provides the framework to ensure the council
creates an asset base that meets the shared ambition for North Lanarkshire to be the
place to live, learn, work, invest, and visit. This musters combined resources and
delivers change in a way that recognises the need for partnership and co-operation to
address challenges through integrated solutions that will make a difference to the lives
of people who live in North Lanarkshire’s communities.  
Latest version: March 2025.
Review timeframe: Annual.
Assessment: The Capital Strategy is key in
supporting the council’s Programme of Work and
creating an asset base that supports delivery of The
Plan for North Lanarkshire, and which delivers on
the shared ambitions and Programme of Work.  
To ensure alignment with the new Strategic Capital
Investment Programme from April 2024, the revised
Capital Strategy for 2024/25 to 2028/29 was
presented to the Policy and Strategy Committee in
March 2024 for approval at the same time.  
The revised Strategic Capital Investment report to
Policy and Strategy Committee in March 2025 [ link
to file ] confirmed that following a review of the
Capital Strategy no changes were required.
The latest update includes a review of the key
principles and reflects the requirements of the new
Prudential Code for Local Authorities.
RAG: 
Chief Officer
(Finance and
Technology)  
✓     ✓  ✓ ✓  ✓  ✓ ✓  ✓   
Strategic Capital Investment Programme
The principles of the council’s strategic capital investment programme are
underpinned by the Capital Strategy. 
The Capital Strategy supports the development of capital investment proposals up to
2028/29 based on available resources aligned to The Plan for North Lanarkshire, Best
Value, the Financial Regulations, the Corporate Asset Management Plan, and the
Medium-Term Financial Plan established within the overarching Financial Strategy. 
• The latest update to the Strategic Capital Investment Programme for 2024/25 to
2028/29 was approved at committee in March 2024: link to file
• An annual update to the programme was considered by committee in March 2025:
link to file 
Established in 2019/20, the Community Investment Fund is a major contributary factor
for investment across North Lanarkshire’s communities.  Since established the
Community Investment Fund has remained under review to ensure the underpinning
Latest version: March 2025.
Review timeframe: Annual.
Assessment: Capital investment proposals up to
2028/29 are set out in the Strategic Capital
Investment Programme for 2024/25 to 2028/29
approved in March 2024.
An annual update to the programme was
considered by committee in March 2025.
The Strategic Capital Investment Programme is key
in supporting the council’s Programme of Work and,
as such, monitoring reports are scheduled to be
provided to committee each cycle; this includes
elements funded by the Community Investment
Fund managed by the Strategic Capital Delivery
Group.  
In addition, an annual Community Investment Fund
progress report is scheduled to be reported to
Chief Officer
(Finance and
Technology)  
✓     ✓  ✓ ✓  ✓  ✓ ✓  ✓   
Page 56 of 108

Page 57

29 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub-principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
assumptions used in determining the potential funding available remain up to date; an
annual report provides a regular update in this respect.  The reports in September
2023 and December 2024 also demonstrating the extent of place-based and service
focussed transformational programme delivery highlights to date.
• December 2024 - link to file (report shows the date as 05/12/23; but this link is the
actual 05/12/24 report)
• September 2023 - link to file
• September 2022 - link to file
committee each year.  This outlines updated
financial projections linked to emerging economic
trends.
RAG: 
Strategic Capital Delivery Group  (SCDG) terms of reference and
governance framework
The SCDG is an officer working group convened of senior officers with responsibility
for the development and delivery of the council’s long-term capital programme. 
The Terms of Reference and Governance Framework allow the SCDG to make
amendments to the approved capital programme subject to limits, adjustments to the
programme to reflect future capital grant allocations, the approval of virement of
resources, and additional projects plus the process for reporting decisions and
recommendations to committee. 
• The Strategic Capital Investment Programme report in March 2025 also includes
an update to the Strategic Capital Delivery Group (SCDG) terms of reference: link
to file
• March 2023: link to file
Latest version: March 2025.
Review timeframe: Terms of Reference reviewed in
line with the requirements of the Strategic Capital
Investment Programme.
Assessment: An update to the Terms of Reference
was approved at the Policy and Strategy Committee
in March 2025 to reflect changes to the council’s
senior management team structure as outlined in
the report to committee in September 2024 (link to
file), as well as an update to the group’s objectives
to reflect the revised process for monitoring capital
programme delivery and financial management of
the capital programme, to confirm the roles of
subject matter experts on the group, and to provide
clarity of the new emerging priorities protocol
agreed by the SCDG to manage unfunded burdens. 
RAG: 
Chief Officer
(Finance and
Technology)  
✓     ✓  ✓ ✓  ✓  ✓ ✓  ✓   
Strategic Capital Delivery Group (SCDG)
Meetings are held each quarter as a minimum.
Minutes and meeting papers available.   
Latest version: Recurring group.
Review timeframe: Strategic Capital Delivery
Group in operation; chaired by Depute Chief
Executive.
Assessment: Effectiveness of the group reviewed
in line with the council’s Strategic Capital
Investment Programme.  
RAG: 
Depute Chief
Executive / Chief
Officer (Finance
and Technology)  
✓     ✓  ✓ ✓  ✓  ✓ ✓  ✓   
Capital monitoring
The capital programme is monitored and managed by the council’s Strategic Capital
Delivery Group.  Consolidated council monitoring reports are prepared regularly and
provide an update on the resources and expenditure for the council’s Capital
Programmes.   
The close monitoring facilitates the group’s proper management of the council’s
ambitious capital programme, including the realignment of resources to ensure its
effective delivery, ensuring resources are directed to where they are most required,
and informing updates to Elected Members through committee where appropriate. 
Capital programme monitoring reports are standing items on the BMT agenda every 4
weeks.  These reports include projected outturns, budget variations and commitments. 
Reports are also submitted to committee each cycle.  These provide an update on the
latest year’s resources and expenditure for the council's Strategic Capital Investment
Programme. The report also shows the latest financial year’s provisional outturn
position and the resultant variances as at the period end. 
• Capital programme 2024/25 monitoring report - May 2025: link to file
• Capital programme 2024/25 monitoring report - February 2025: link to file 
A regular exceptions report is also considered by the BMT which supports senior
management oversight and scrutiny of capital projects with a budget over £0.100m
that have a red delivery status.
Latest version: Period end report in February 2025
and annual report for 2024/25 in May 2025.
Review timeframe: As at each period end and as at
the year end.
Assessment: Capital monitoring reports are
submitted to committee each cycle throughout the
year and at the year-end.
RAG:
Chief Officer
(Finance and
Technology)  
✓     ✓  ✓ ✓  ✓  ✓ ✓  ✓   
Annual accounts
The preparation of the Accounts is a key statutory responsibility for Finance and the
council. The Local Authority Accounts (Scotland) Regulations 2014 require the council
to prepare Annual Accounts, section 12 of the Local Government in Scotland Act 2003
requires these to be prepared in accordance with proper accounting practices,
primarily the Code of Practice on Local Authority Accounting in the United Kingdom,
supported by International Financial Reporting Standards (IFRS), and statutory
guidance issued. 
• Annual accounts (audited) - October 2024 link to file
• Annual accounts (audited) - October 2023 link to file
Latest version: October 2024.
Review timeframe: Annual.
Assessment: The preparation of the Annual
Accounts is a key statutory responsibility for the
council.  The audited annual Accounts for 2023/24
were approved by the Audit and Scrutiny Panel in
October 2024 for signing.
The unaudited Annual Accounts for 2023/24 were
presented to the external auditors by end June
2024, in line with statutory requirements.  This
followed due consideration of the unaudited Annual
Chief Officer
(Finance and
Technology)  
✓     ✓  ✓ ✓  ✓  ✓ ✓  ✓ ✓ ✓ ✓
Page 57 of 108

Page 58

30 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub-principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
• Annual Accounts (audited) - October 2022 link to file 
• Annual Accounts are published on the council’s website:
https://www.northlanarkshire.gov.uk/your-council/facts-and-figures/annual-
accounts/current-and-previous-years-annual-accounts 
Accounts for 2023/24 by the Audit and Scrutiny
Panel in June 2024.
RAG: 
Risk Management Strategy
The Risk Management Strategy outlines that effective risk management arrangements
form an important element of good corporate governance and are designed to ensure
that the council operates systematic and logical processes for managing business
risks within a comprehensive framework, ensuring that identified risks are managed
consistently, effectively, efficiently, and coherently across the organisation. 
• Risk Management Strategy - March 2023: link to file
Latest version: March 2023.
Review timeframe: 3 year strategy.
Assessment: Risk Management Strategy approved
in March 2023 covers the period 2023 to 2026.  
An item within the Strategic Policy Framework, the
Risk Management Strategy is next scheduled to be
reviewed in December 2025 and reported to
committee in cycle 1 of 2026.
In addition, reports are scheduled to be submitted to
the Audit and Scrutiny Panel each cycle to regularly
assess the effectiveness of the risk management
arrangements which the council has in place to
assist the identification and management of risks,
strengthen organisational resilience, improve
governance and stakeholder confidence and trust,
increase the likelihood of the council achieving its
planned outcomes, priorities, ambitions, and report
the results of that assessment to key stakeholders.
RAG:  
Chief Officer (Audit
and Risk)       ✓  ✓ ✓ ✓   ✓ ✓ ✓  ✓   
Workforce plans
Best Value guidance requires that councils demonstrate effective use of resources.  In
terms of staff this means: 
• A workforce strategy is in place that sets out expectations on how the local
authority’s staff will deliver its vision, priorities, and values.
• The strategy is translated into workforce plans, covering employee numbers,
skills, knowledge, competencies, and organisational structures that demonstrate
how staff will be deployed to deliver the services planned for the future. 
• Plans are regularly reviewed at appropriate intervals according to a clear review
cycle. 
• One Workforce report - December 2024: link to file
• One Workforce report - December 2023: link to file 
Latest version: December 2024.
Review timeframe: Annual.
Assessment: Following work by each Chief Officer
which included identifying a range of actions to
address workforce gaps and setting out detailed
service level workforce plans with an agreed bi-
annual refresh cycle, a strategic workforce plan was
reported to the Policy and Strategy Committee in
December 2023 with an update on progress against
the plan provided in December 2024.  
This plan is intended to enable the core aims and
objectives of the Programme of Work and its wider
ambitions linked to the Plan for North Lanarkshire.
Specifically, the One Workforce Plan has a focus on
ensuring that the council has the required workforce
capacity and capability to deliver on its strategic
aims and objectives both now and in the future.
As at spring 2025, further work is currently
underway to review and update each service’s
strategic workforce plans to ensure an approach to
workforce / resource planning that is sustainable
and further supports the scenario planning /
forecasting work previously carried out in 2023 in
respect of future planning and the development of
the Leadership and Operating Model for the
Community Hubs.  A further annual update report is
scheduled to be reported to the Policy and Strategy
Committee in December 2025. 
RAG: 
Chief Officer
(People Resources)            ✓         
General Contract Standing Orders (GCSO)
The Local Government (Scotland) Act 1973 section 81 requires local authorities to
“…make standing orders with respect to the making by them or on their behalf of
contracts for the supply of goods or materials or for the execution of works”. 
The General Contract Standing Orders (“GCSOs”) sets out the council’s specific
procurement procedures and responsibilities at all spend levels, covering both
regulated and non-regulated approaches. The GCSOs also place requirements on
service areas to effectively plan and manage the resulting contracts. 
• GSCO version 14 was the last substantial update that was approved by committee
in June 2018: link to file
• Minor updates have been applied since that did not require further approval. 
• The latest version of the GSCOs (17th edition – effective from April 2025) is
publicly available on the council’s website:
https://www.northlanarkshire.gov.uk/business/procurement/key-procurement-
documents 
Latest version: General Contract Standing Orders
(GCSO) were approved at the former Policy and
Resources Committee in June 2018.  These were
subsequently updated and the 17th edition - effective
from April 2025 -  is now available.
Review timeframe:  The GCSO require to be kept
under regular review to ensure they work effectively
and secure continuous improvement and Best
Value.
Assessment: Further reviews will be undertaken in
line with any legislative changes or national
guidance issued. 
RAG: 
Chief Officer
(Assets and
Procurement) 
✓ ✓             ✓     
Page 58 of 108

Page 59

31 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub-principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3 
An Internal Audit review on Achieving Best Value in Procurement was undertaken in
2023. Following this, a report was presented to the Audit and Scrutiny Panel in
October 2023 [ link to file ] which included a number of improvement actions. The
main action was to update the level of information and details within the Contract
Awards Below Committee Approval Threshold, which is a requirement of GCSO 21.10.
This action has since been completed with the new reporting format implemented and
in place since November 2023 [ see live example ].
Procurement Strategy
In Scotland, public bodies with an annual procurement spend of £5 million or more are
required by legislation to prepare and publish a procurement strategy or revise an
existing strategy under Procurement Reform (Scotland) Act 2014. 
The Procurement Strategy requires to be approved and in place for the start of each
financial year, and as such cycle 1 is the optimum reporting point to Committee. 
• Procurement Strategy 2025/26 - February 2025: link to file
• Procurement Strategy 2024/25 - February 2024: link to file
• Procurement Strategy 2023/24 - September 2022: link to file 
The current Procurement Strategy 2025/26 is publicly available on the council’s
website: https://www.northlanarkshire.gov.uk/business/procurement/key-procurement-
documents 
Latest version: February 2025.
Review timeframe: Annual.
Assessment: The council has prepared and
published Procurement Strategies since 2017 in
conformance with the requirements of the Act; the
latest Procurement Strategy approved at committee
in February 2025 covers the period from April 2025
to March 2026. An item within the Strategic Policy
Framework, the Procurement Strategy is scheduled
to be updated and reported to committee in cycle 1
each year.
RAG: 
Chief Officer
(Assets and
Procurement) 
✓ ✓             ✓     
Annual procurement report
The Procurement Reform (Scotland) Act 2014 requires the council to prepare an
annual procurement report on its Regulated Procurement activities as soon as
reasonably practicable after the end of each financial year. 
Production of the APR follow the end of each financial year, where spend data is
collated and analysed. Cycle 3 is the optimum reporting point to Committee. 
• Annual procurement report 2023/24 - September 2024: link to file (report shows the
date as 13/09/23; but this link is the actual 11/09/24 report)
• Annual procurement report 2022/23 - September 2023: link to file
• Annual procurement report 2021/22 - September 2022: link to file 
The last annual procurement report is publicly available on the council’s website:
https://www.northlanarkshire.gov.uk/business/procurement/key-procurement-
documents 
Latest version: September 2024.
Review timeframe: Annual.
Assessment: The annual procurement report
provides a summary of performance of the council
Procurement Strategy and provides performance
statistics that are collated by the Scottish
Government to produce a national Annual
Procurement Report.  The latest annual report
covering financial year 2023/24 was approved at
committee in September 2025.  
An item within the Strategic Performance
Framework Performance Reporting Schedule the
annual report is scheduled to be updated and
reported to committee in cycle 3 each year.
Each cycle, there are committee reports for
approval of contract awards above £500k supplies
and services, above £2M works; acknowledgement
of contract awards £50k-£500k supplies and
services, £500l-£2M works; and, awarded contracts
that have had variations greater than 10% of the
award value. 
RAG: 
Chief Officer
(Assets and
Procurement) 
✓ ✓             ✓     
Climate change - committing to net zero 
The council recognises the need for urgent action and, as such, declared a Climate
Emergency in June 2019.  In addition, the council became a signatory of the
Edinburgh Biodiversity Declaration in June 2021, recognising the need to protect
nature as well as the important role it will play in tackling climate change.
The risk of climate change to the local economy is considered significant and therefore
as well as being the right thing to do, any deliberate interventions will benefit North
Lanarkshire. Actions delivered consider the impact on the vulnerable such as those
likely to become fuel poor and ensure that these households are not negatively
impacted on. 
The council’s medium and long-term aims are as set out in the Climate Plan
(approved in February 2022) - this encompasses the council’s own climate emergency
declaration and its subsequent targets regarding emissions.  The climate plan therein
provides targets supported by thematic carbon budgets from 2021/22 to 2025/26 with
a commitment to continually review and set targets beyond this.
• Climate Plan: Action on Climate Together - February 2022: link to file 
The Climate Change (Duties of Public Bodies; Reporting Requirements) (Scotland)
Order 2015 introduced a legal obligation for public bodies to report annually detailing
their compliance with the duties specified in the Climate Change (Scotland) Act 2009
and its subsequent amendments. The report is produced annually for the most
recently completed financial year with a submission date of 30th November each year.
The annual submission requires the council to demonstrate that, as a public sector
organisation, it is contributing to the nationally set climate change targets as well as
Latest version: February 2025.
Review timeframe: Annual.
Assessment: The council’s Climate Plan was
approved in February 2022. Each year, an annual
report is produced on the council’s compliance with
the public sector climate change duties and the
status of the council in terms of its emissions
targets.  The February 2025 report in this respect
shows a summary of the council’s annual footprint in
terms of emissions (tCO2e) from the baseline year
(2015/16) to the end of the latest reporting year
(2023/24).  The report in February 2025 also
highlights a sample of the activity and actions
contained within the Climate Plan Action Plan and
the Programme of Work which contribute to
reducing North Lanarkshire’s emissions as well as
encouraging more sustainable practices within the
area.
Findings from an internal audit on climate change
(and to review the council’s progress in reducing its
carbon footprint) were reported to the Audit and
Scrutiny Panel in November 2023 [ link to file ] and
the Policy and Strategy Committee in March 2024   
[ link to file ].
RAG: 
Chief Officer
(Assets and
Procurement)       
✓             
Page 59 of 108

Page 60

32 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub-principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
adhering to its other responsibilities in terms of both adaptation and sustainability.
The report ensures the council fulfils its legal obligations; it also provides an update on
progress against the council’s carbon budgets set within the Climate Plan and the
Energy Policy targets.  
• Public Sector Duties Climate Change annual report 2023/24 - February 2025: link to
file
• Public Sector Duties Climate Change annual report 2022/23 - February 2024: link to
file
• Public Sector Duties Climate Change annual report 2021/22 - February 2023: link to
file 
The statutory reporting process is supported by the Sustainable Scotland Network
who also analyse the annual submissions from the public sector bodies’ reports and
report their overall findings publicly.  This includes identifying strengths and
weaknesses (https://sustainablescotlandnetwork.org/reports ).
Asset management
The Corporate Asset Management Plan (CAMP) provides an overview of how the
council is managing its assets in alignment with the strategic direction of the
organisation to both deliver and sustain an asset base that will meet current and future
requirements. The CAMP is one of the tools used to manage the asset base and guide
activities (i.e. maintain, rationalise, invest, dis-invest); it links into the ongoing review
and development of the 5 year capital plan.
• CAMP 2021-26 - September 2022: link to file 
Updates on the asset rationalisation and development area of work - which includes
reviewing the use of assets on a regular basis to ensure their ongoing effectiveness -
were provided to the Policy and Strategy Committee in March 2020 and October 2020.  
Latest version: September 2022.
Review timeframe: Corporate Asset Management
Plan approved in September 2022 covers the period
from 2021 to 2026.
Assessment: The CAMP is on the Strategy Policy
Framework review programme to report on an
update in 2025/26, when the current plan reaches
the end of its current life.
RAG:
Chief Officer
(Assets and
Procurement)           
✓         
Communications and Engagement Strategy
The council’s Communications and Engagement Strategy outlines an approach to
achieve maximum communication support for council priorities, ambitions, and the
activities and projects outlined in the Programme of Work. The strategy sets out a
clear direction for public-facing and internal communications and engagement activity
as well as the core principles underpinning the approach to deliver effective
communications. Ensuring alignment with The Plan for North Lanarkshire and the
Programme of Work is key, together with demonstrating the effectiveness and success
of communications and engagement activity, which will be evaluated and measured
annually to evidence positive outcomes.
• Communications and Engagement Strategy - June 2024: link to file
• Communications Strategy - June 2019: link to file 
New platform developed for the council’s website went live in November 2020:
https://www.northlanarkshire.gov.uk/ 
The council’s website has a section dedicated for public consultation
https://www.northlanarkshire.gov.uk/your-community/working-
communities/consultations. This section is used - along with other methods as
appropriate - when draft strategies, policies, plans, or changes to service provision
require feedback from the public as part of the development process.
Latest version: June 2024.
Review timeframe: Process in place to update the
communications plan on a regular basis.
Assessment: The council’s Communications
Strategy was approved in June 2024. 
Key to supporting the Programme of Work, the
strategy is scheduled to be reviewed and updated in
line with the current Programme of Work to 2028
timeframe.
A programme of communications activities,
campaigns, and projects are undertaken each year
to support The Plan for North Lanarkshire and
Programme of Work, the latest annual evaluation
report demonstrating outcomes in this respect is
scheduled to be reported to the Policy and Strategy
Committee in June 2025.
RAG: 
Chief Officer
(Strategy and
Engagement)   
✓ ✓ ✓ ✓   ✓         ✓  
Digital and IT Strategy
IT and digital are integral to the future success of The Plan for North Lanarkshire, and
the Digital and IT Strategy highlights how technology will be used to transform service
delivery and deliver on the vision for a Digital North Lanarkshire with Digital
Communities, a Digital Economy, and a Digital Council. 
The Digital and IT Strategy is central to delivery of the council’s transformational /
service redesign programme as well as enabling many of the elements within the
council’s Programme of Work.  The Strategy details the programmes, projects, and
policies that will enable the council to recover, renew, and transform services by
exploiting emerging technology to the benefit of employees, service delivery, and
ultimately the people and communities of North Lanarkshire. It guides services to
transition from the current traditional IT estate to a new and agile digital service
delivery. 
• Digital and IT Strategy 2024 to 2027 - March 2024: link to file
• Annual review and refresh, February 2022: link to file
Latest version: March 2024.
Review timeframe: Strategy reviewed and updated
when it reaches the end of its current life.
Assessment: Following approval of the Programme
of Work to 2028 in March 2023, the opportunity was
taken to realign the Digital and IT Strategy
accordingly and firmly establish what it means to be
digital and move from doing digital to being digital. 
The Digital and IT Strategy for 2024 to 2027 aims to
provide a clear direction and ensure a common
shared understanding of the journey that needs to
be taken to achieve a Digital North Lanarkshire.
This also makes it clear how digital will support
delivery of the other six Programme of Work
priorities and where resources need to be targeted
through a one council approach. 
An item within the Strategic Policy Framework, the
Digital and IT Strategy is next scheduled for review
when it reaches the end of its life in 2026/27.  
As agreed in March 2024 [ link to file ], the Policy
and Strategy Committee will receive updates on
implementation of the Strategy on a six-monthly
basis.
Chief Officer
(Finance and
Technology)    
✓ ✓  ✓  ✓  ✓ ✓    ✓    
Page 60 of 108

Page 61

33 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub-principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
RAG: 
Enterprise Architecture Governance Group (EAGG)
The EAGG aims to ensure a consistent, coherent, and complete council-wide
(enterprise) perspective to design to enable business operations to be transformed
and the associated benefits to be secured in a co-ordinated manner across the
organisation. 
The EAGG ensures: 
• Organisation wide governance for all digital solutions and services.
• That a cohesive, integrated, and data driven approach to enterprise wide
architecture is undertaken.
• A holistic full lifecycle view of solutions is considered.
• The council’s enterprise architecture principles are considered and addressed for
new proposals.
• The council’s enterprise architecture principles remain relevant. 
The EAGG has the ability and responsibility to challenge operational business cases,
ensuring a holistic organisation wide approach to design is maintained and best value
is achieved. 
Meetings are held approximately every six weeks.
Minutes and meeting papers available.   
Latest version: Recurring group.
Review timeframe: The group was formed in
November 2019 to provide strategic governance
and oversight for all digital and IT related projects,
services, solutions, and operations across the
council to ensure such are fit for purpose and
comply with all relevant standards, specifications,
and principles.
Assessment: A review of the terms of reference for
the Group was undertaken early in 2023 which
identified improvements to the supporting
documentation suite.  
The intentions set out in the Digital and IT Strategy
are underpinned by the work of the EAGG.  The
Digital and IT Strategy (refreshed in March 2024)
reflects the key governance role of the EAGG.
RAG:  
Chief Officer
(Finance and
Technology)       
✓  ✓  ✓   ✓  ✓   ✓ 
Data Governance Board
The purpose of the Data Governance Board is to maintain strategic oversight and
implementation of the council’s approach in relation to data governance and to secure
the relevant assurances that effective arrangements are in place for the safe and
secure collection, storage, use, and sharing of data, including processes to safeguard
personal data and support data quality.  This includes responsibility for developing and
overseeing the implementation of strategies, policies, procedures, and standards in
relation to data governance and data management, and for directing improvements in
accordance with legislative, regulatory and corporate governance requirements and in
support of the organisation’s corporate vision and strategy.  
The Data Governance Board is also responsible for directing and overseeing the work
of its supporting Data Management and Compliance Group and ensuring measures
are in place to monitor compliance across the council and its arm’s length external
organisations. 
Meetings are held approximately every 8 weeks.
Minutes and meeting papers available.   
Latest version: Recurring group.
Review timeframe: Terms of reference reviewed
annually; group membership is reviewed in line with
staffing changes across the organisation.  
Assessment: The former Senior Information Risk
Owner (SIRO) reviewed the Data Governance
Board during 2024 which led to changes to its terms
of reference, membership, and work programme. 
An update in this respect was provided in the Senior
Information Risk Owner’s (SIROs) latest annual
governance and performance report in February
2025 [ link to file ].
As noted within this report, responsibility for the role
of the council’s SIRO changed to the Chief Officer
(Legal and Democratic) from April 2025.  As such,
the Chief Officer (Legal and Democratic) presented
proposals to the Data Governance Board meeting in
May 2025 for further enhancements to strengthen
the council’s approach to date governance and
information security (through both the Data
Governance Board and the Data Management and
Compliance Group); these proposals were approved
by the Board and are being implemented with
immediate effect.
RAG: 
Chief Officer (Legal
and Democratic)        ✓  ✓  ✓   ✓  ✓   ✓ 
Information and Cyber Security Policy
An Information Security Policy, which includes cyber security, is in place; this aims to
protect the council’s information systems and physical assets including supporting
processes, networks, and equipment.  This is essential to ensure the council can
continue to operate and successfully deliver its functions, while finding the right
balance between the benefits and risks to the processing of information. 
• Information Security Policy - June 2023: link to file 
Cyber security is the activity required to protect an organisation’s data, devices,
networks, and software from unintended or unauthorised access, change or
destruction via the internet or other communications systems or technologies. 
Cyber incidents pose an increasing threat to public bodies’ management of their
information with hacking, ransomware, cyber-fraud, and accidental losses all evident
across the public and private and sectors.  
A joint review and assessment undertaken in 2022/23 (between Internal Audit and
Business and Digital) using a structured format (using templates and guidance created
by the National Audit Office, National Cyber Security Centre (NCSC), and the Scottish
Government).  This assessment - categorised as reasonable assurance - determined
the council has robust and effective information governance arrangements, duly
recognised the risks associated with cyber security threats, and operates practices
commensurate with the good practice recommended by bodies such as the National
Latest version: June 2023.
Review timeframe: Every two years.
Assessment: Latest version of the Information
Security Policy was approved at Policy and Strategy
Committee in June 2023.  
A review was undertaken on this policy in March
2025 and the updated policy now incorporates both
information security and cyber security to reflect the
importance of cyber security in the council’s daily
operations and strategic approach to service
delivery as defined in both the Digital and IT
Strategy and The Plan for North Lanarkshire. As the
council takes a digital by default approach to service
delivery and much of information is now in a digital
format, this brings cyber threats that must be
mitigated and managed to protect the council’s
information and IT assets. 
An updated Information and Cyber Security Policy
was considered by the Data Governance Board
thereafter, with a report expected to be submitted to
committee in cycle 3 of 2025.
RAG:  
Chief Officer (Legal
and Democratic)     ✓ ✓  ✓  ✓  ✓ ✓    ✓    
Page 61 of 108

Page 62

34 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub-principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
Audit Office.  The outcome from this review was reported to the Audit and Scrutiny
Panel in February 2023: 
• Cyber security assessment - February 2023: link to file 
Senior Information Risk Owner (SIRO) 
The SIRO role is fulfilled by a member of the CMT.  The SIRO has ownership of the 
council’s information risk policy, and acts at the strategic level as the advocate of
information assurance and risk. 
Good practice in information governance requires an annual information governance
and performance overview report to be presented to senior management and Elected
Members outlining the council’s information governance arrangements, performance,
and compliance against key expectations and requirements.  This report aims to
provide assurances that information risks are being effectively managed to ultimately
enable the council to comply with legislative requirements and good practice. 
• Senior Information Risk Owner (SIRO) Information Governance Assurance and
Performance Report 2024 - February 2025: link to file
• SIRO Information Governance Assurance and Performance Report April 2022 to
November 2023 - February 2024: link to file
• SIRO Information Governance Assurance and Performance Report 2021/22 -
February 2023: link to file
Latest version: February 2025.
Review timeframe: Annual.
Assessment: As noted within the February 2025
annual report, responsibility for the role of the
council’s SIRO changed to the Chief Officer (Legal
and Democratic) from April 2025.  
The annual reports to the Finance and Resources
Committee enables Elected Members to consider
an up to-date position in respect of the council’s
information governance and information risk
management arrangements.
RAG: 
Chief Officer (Legal
and Democratic)     ✓ ✓  ✓  ✓  ✓ ✓    ✓    
Data protection 
Prior to April 2025, the Chief Officer (Legal and Democratic) was the council’s Data
Protection Officer (DPO).  As noted within the February 2025 annual Senior
Information Risk Owner (SIRO) report, responsibility for the role of the council’s SIRO
changed to the Chief Officer (Legal and Democratic) from April 2025 resulting in the
role of the DPO now sitting with the Principal Solicitor (Information Governance) given
their subject matter expertise.  
The DPO role sits side by side with the council’s Senior Information Risk Owner
(SIRO).   
• The Data Protection Policy was updated in line with the Information Governance
Policy Framework in June 2023: link to file
• Data protection information is published on InsideNL: link to files.  This includes
Data Protection Impact Assessment (DPIA) guidance and template, General Data
Protection Regulation (GDPR) guidelines, data protection breach and incident
management protocol, privacy notice template, and data sharing agreements.
Latest version: June 2023.
Review timeframe: Every two years.
Assessment: Policies and procedures in place and
communicated via InsideNL.  Latest version of the
Data Protection Policy approved at Policy and
Strategy Committee in June 2023. 
The Data Protection Policy is currently under review
as part of the Information Commissioners Officer
(ICO) action plan.  This updated policy is scheduled
to be considered by the Data Governance Board at
its meeting in September 2025 with an update
reported to committee in cycle 4 of 2025.
RAG: 
Chief Officer (Legal
and Democratic     ✓ ✓  ✓  ✓  ✓ ✓    ✓    
Data protection annual report
The General Data Protection Regulation (GDPR) and the Data Protection Act 2018
(DPA) came into force in May 2018.   
An annual report updates on compliance with the regulations. 
• Annual data protection report 2023/24 - September 2024: link to file
• Annual data protection report 2021/22 - March 2023: link to file 
• Annual data protection report 2020/21 - November 2021: link to file   
Latest version: September 2024
Review timeframe: Annual.
Assessment: The annual data protection report
forms part of the Strategic Performance Framework
reporting schedule.  The latest report in September
2024 (by the council’s DPO) provided an update in
relation to data sharing, breaches, complaints, and
training. 
The next report is scheduled to be reported to the
Finance and Resources Committee by the end of
2025/26.
RAG: 
Chief Officer (Legal
and Democratic)     ✓ ✓  ✓  ✓  ✓ ✓    ✓    
Freedom of Information 
The Freedom of Information (Scotland) Act 2002 and the Environmental Information
(Scotland) Regulations 2004, both of which came into force in January 2005, provide
rights to the public to ask for and be provided recorded information held by public
authorities. 
• The process is outlined on the council’s website; the website also contains a guide
to information available through the model publication scheme - November 2021:
https://www.northlanarkshire.gov.uk/your-council/managing-information/freedom-
information 
Latest version: November 2021.
Review timeframe: As required.
Assessment: Policies and procedures in place and
communicated through the council’s website.
RAG: 
Chief Officer (Legal
and Democratic) ✓  ✓              ✓  ✓ ✓ 
Freedom of Information annual report
This report provides a breakdown of the Freedom of Information (and Environmental
Information) requests, internal reviews, and appeals to the Scottish Information
Commissioner processed by the council in each financial year. 
• Annual Freedom of Information report 2023/24 - February 2025: link to file
• Annual Freedom of Information report 2022/23 - November 2023: link to file
• Annual Freedom of Information report 2021/22 - November 2022: link to file 
Latest version: February 2025.
Review timeframe: Annual.
Assessment: The annual freedom of information
report forms part of the Strategic Performance
Framework reporting schedule.  The latest report in
February 2025 provided an update on the number of
Freedom of Information and Environmental
Information requests as well as the number of
internal reviews and appeals to the Scottish
Chief Officer (Legal
and Democratic) ✓  ✓              ✓  ✓ ✓ 
Page 62 of 108

Page 63

35 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub-principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3 
Information Commissioner processed.
The next report is scheduled to be reported to the
Finance and Resources Committee by the end of
2025/26.
RAG: 
Employment policies and associated guidance
The MyNL Policies A to Z site lists all of North Lanarkshire Council’s employment
policies and the associated guidance documents and forms. 
https://mynl.co.uk/a-to-z/ 
Contracts of employment and job descriptions are in place for all posts to give
employees a clear sense of purpose and direction. 
A recruitment process is in place which is applied consistently to ensure transparency
and fairness.   
In line with the Scheme of Administration, an Appointments Sub-Committee is in place
to deal with the recruitment and appointment of Chief Officers / Depute Chief Officer
with full delegated powers to consider and agree the job outline, employee
specification, advertising proposals and interviewing procedures, agree the shortlist of
candidates to be interviewed, interview the shortlisted candidates, and make the
appointment.
Latest version: Policies are all individually dated.
Review timeframe: Each policy is reviewed and
updated as required in line with organisational
and/or legislative changes.
Assessment: MyNL contains an A-Z list of all of the
council’s employment policies and the associated
guidance documents and forms.  These documents
are available to download.  A version control
process is in place to identify the date of the last
review and refresh for each document.
RAG: 
Chief Officer
(People Resources) ✓ ✓ ✓          ✓    ✓    
Professional / specialised input to policy development and decision
making
Business partners in People Resources and Finance are aligned to specific services in
order to provided dedicated professional support.  Solutions Relationship Managers in
Business and Digital are aligned to services to facilitate a smooth transition to
integrated technology and digital solutions and increase understanding of available
solutions and levels of consumption. 
Specialised input is also incorporated into the council’s committee report process
which requires sections completed on the following impacts:
• Public Sector Equality Duty / Fairer Scotland Duty
• Financial 
• HR policy
• Legal
• Data protection
• Technology / digital
• Environmental / carbon - change in February 2022 reflects the agreement at the
Council meeting in June 2021, that the environmental impact was to be changed to
environmental / carbon impact.
• Communications
• Risk 
• Armed Forces Covenant Duty
• Children’s rights and wellbeing impact 
The role, and need for, good governance is reiterated in the Guidance accompanying
the Report Template which requires to be used for all council reports. 
An e-learning module Writing Effective Committee Reports has been developed on
LearnNL.  The aim of this course is to establish a one-way approach to writing
committee reports within the council.  The e-learning module can be accessed through
the following link: https://learnnl.learningpool.com/course/view.php?id=547 
A One Way of Reporting booklet has been developed - this style guide provides
guidance for those who have to put something in writing on behalf of the council.  This
can be anything from a letter, leaflet, strategy document, or news release to a
committee report.  This is available on InsideNL: One Way of Reporting.pdf.
Latest version: Ongoing.
Review timeframe: As required.
Assessment: Structures and processes are in place
that provide services with access to officers for
various purposes, such as professional / specialised
input to policy development and decision making
and for report writing purposes. 
The committee report template and guidance is
reviewed and updated regularly (either as a new
impact is identified and endorsed by the CMT, or
once a year as a matter of course).  An update in
February 2022 aimed to further improve the
contents of the impacts section in committee reports
and provide authors with subject matter experts
contact details for further information and guidance. 
A further update in December 2022 reflected the
new impact for the Armed Forces Covenant Duty
and the change in Head of Service designations to
Chief Officers.  
An update in June 2023 included the introduction of
an impact for children’s rights and wellbeing.  
A subsequent update in September 2023 introduced
a new dropdown option to show alignment, where
appropriate, to the Programme of Work to 2028.
The updated template and guidance is available on
InsideNL: Report Template.  
Updates to the report template and guidance are
issued to all employees via a NLC Announcement e-
mail following each update.
RAG:
All Chief Officers    ✓    ✓      ✓  ✓  ✓ ✓ ✓ 
Fairer Scotland Duty
The Fairer Scotland Duty (FSD) came into effect in April 2018.  The duty places a legal
responsibility on particular public bodies in Scotland to actively consider how they can
reduce inequalities of outcome caused by socio-economic disadvantage when making
strategic decisions or at the policy development stage.  
August 2018: link to file 
Interim guidance was published nationally at that time.  While awaiting further
guidance from the Scottish Government (which wouldn’t be published until 2021), the
council was required to take steps to ensure that the duty is taken forward through
combining the needs of the FSD into the equality impact assessment process, as
Latest version: November 2023
Review timeframe: As this is nationally produced
guidance, the Scottish Government undertook a
consultation in May 2021 with a view to revising and
finalising the interim guidance.  Updated guidance
was subsequently published in October 2021.
Assessment: The guidance adopted by the council 
also incorporates the equality impact assessment
process and templates into the committee report
writing processes. This guidance is on MyNL            
[ https://mynl.co.uk/knowledge-base/equality-
Chief Officer
(People Resources)    ✓  ✓  ✓ ✓            
Page 63 of 108

Page 64

36 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub-principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
recommended in the FSD interim guidance. 
In preparation for the final guidance being published in 2021, the council considered
how its own approach had delivered on the duty to reduce socio-economic
disadvantage. The findings from this review were presented to committee in
September 2021: link to file 
Updated guidance was published by the Scottish Governance in October 2021.  The
guidance didn’t change substantially from what was published in 2018, as the duty
hadn’t changed, but it was updated, enhanced, and informed by the experience of
delivering the duty over the last three years. The pandemic and its impacts are
reflected in the guidance, highlighting how important consideration of socio-economic
disadvantage is in decision making in order to tackle the unequal impact on those on
low incomes, with low wealth, in material deprivation, or living in deprived areas. 
Information in terms of the updated guidance was reported to committee in January
2022: link to file
impact-assessments/  ].
Following publication of the updated national
guidance, a report was submitted to committee in
January 2022 highlighting the changes from the
previous guidance.
RAG: 
Equality Strategy
The council’s Equality Strategy sets out a clear commitment to deliver equality for
communities, service users, and employees through outcomes specifically developed
to support the council’s vision to make equality an embedded element of not only
mainstream service delivery, but also the operation of the council. 
The Equality Strategy therefore underscores the council’s commitment to equality and
human rights and sets out an approach that ensures that equality is embedded within
everyday business through five key underpinning objectives for success. 
• Equality Strategy - September 2019: link to file
Latest version: August 2019
Review timeframe: The Equality Strategy approved
in August 2019 covers the period from 2019 to
2024.
Assessment: The Equality Strategy is on the
Strategy Policy Framework review programme and
has been reviewed during 2024/25.  This work
included agreement of a revised set of equality
outcomes for the council which were approved by
the Wellbeing and Tackling Poverty Committee in
April 2025 [ link to file ].  A refreshed Equalities
Strategy is scheduled to be presented to the Policy
and Strategy Committee in cycle 4 of 2025. 
RAG: 
Chief Officer
(People Resources)    ✓  ✓  ✓ ✓            
Equality Impact Assessments (EqIA)
The council ensures that equality impact assessments (EqIA) are undertaken to
ensure fairness and openness in the decisions taken.  This ensures a process is in
place to examine the council’s main functions and policies to see whether they have
the potential to affect people differently. 
Carrying out an EqIA on council policies, practices, decisions (including financial
decisions), functions, and strategies helps to identify any negative impact on particular
groups of people and therefore allows for action to be taken to remove it or lessen its
negative effects.  EqIAs also include assessments under the Fairer Scotland Duty. 
EqIAs are also undertaken as part of the annual budget decision process. 
EqIAs are published by each service on the council’s website:
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Latest version: Ongoing.
Review timeframe: Registers are reviewed at
varying times within each service.
Assessment: The council has an Equalities Board,
and a key remit of this Board is to review and further
strengthen the council’s approach to Equality Impact
Assessments.
An independent review of the council’s recent
equality impact assessments, aligned to its budget
savings, was undertaken by the Scottish Women’s
Budget Group in April 2024 and a report with
recommended improvements was produced. Based
on recommendations within the report, the Equality
Impact Assessment template and guidance has
been refreshed, and a full Equality Impact
Assessment training programme was delivered
during 2024/25 for third and fourth tier officers.
RAG: 
Chief Officer
(People Resources)    ✓  ✓  ✓ ✓            
Public Sector Equality Duties
Every four years public bodies covered by the Public Sector Equality Duties (PSED)
are required to publish a number of reports and information to evidence how they are
meeting the needs of people whose characteristics are protected by the Equality Act
2010 - the PSED (General Duty).  The latest update in April 2025 fulfils this
requirement.
• Public Sector Equality Duties - April 2025: link to file
• Public Sector Equality Duties - June 2021: link to file 
In April 2020, the council was successfully reaccredited as a Disability Confident
Leader after undergoing an external assessment conducted by Inverclyde Council.  In
August 2021 the council successfully participated in the pilot and achieved the Equally
Safe at Work Bronze Standard award.
• Disability Confident Leader and Equally Safe at Work - August 2021: link to file
• Disability Confident Leader - Employer Accreditation Programme - April 2020: link
to file 
A Race at Work Charter was approved at committee in October 2021.  This provides a
framework to support employers to take practical steps to ensure that their workplaces
are identifying and tackling barriers that minority ethnic people face in in the
Latest version: Various.
Review timeframe: Various.
Assessment: The Public Sector Equality Duty
combined report in April 2025 covers a number of
different requirements including - Mainstreaming
Equalities, progress in achieving the council’s
equality outcomes, employment Information, and
the Equal Pay Policy Statement.  
The Delivery Framework for Equalities for 2023/24
was approved in February 2023.  An update to the
Wellbeing and Tackling Poverty Committee in April
2024 set out the priorities for the 2024/25 Delivery
Plan for Equalities.
The council’s most up to date Mainstreaming
Equality report was approved by the Wellbeing and
Tackling Poverty Committee in  May 2023.
The council’s progress as a Fair Work Employer
was reported to the Wellbeing and Tackling Poverty
Committee in November 2023.
RAG:
Chief Officer
(People Resources)    ✓  ✓  ✓ ✓            
Page 64 of 108

Page 65

37 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub-principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
workplace. It requires employers to commit to seven calls to action to ensure that
ethnic minority employees are represented at all levels and that their organisation
reflects British society today.
• Race at Work Charter - October 2021: link to file 
The council has embedded the principles of Scotland’s Fair Work Convention
Framework (2016) that describes fair work as work that offers effective voice,
opportunity, security, fulfilment, and respect.
• Fair Work Employer - November 2023: link to file 
A service review identified the need to be clearer about how the Equality Strategy is
being delivered and to set out the significant equalities programmes of work which link
to the ambitions and intentions within The Plan for North Lanarkshire, including
support for those who are most disadvantaged.   As such, a new delivery framework
for equalities was developed outlining more clearly the key areas of focus within
Equalities which will be supported by an associated plan of activities and campaigns
to support the advancement of the Equalities Strategy.  This was approved at
committee in February 2023 and an update provided in April 2024.
• Delivery Framework for Equalities, update - April 2024: link to file
• Delivery Framework for Equalities 2023/24 - February 2023: link to file 
A Plan for Advancing Race Equality in the council’s workforce, communities, and
schools was approved at committee in February 2023: link to file 
The Mainstreaming Equality report was updated and approved at committee in May
2023.  This details how the council, including the Education authority and the
Licensing Board, is demonstrating that the general equality duty is integral to its work. 
This composite report also updated on progress being made to deliver against the
stated Equality Outcomes for 2021-25 and provided an updated picture of the current
equalities profile of council employees, employment practices, and pay gap
information as required to be published by law every two years.
• Mainstreaming Equality report - May 2023: link to file
Corporate Risk Register
The corporate risk register is formally reviewed annually to ensure completeness and
continuing alignment to the council’s strategic objectives, The Plan for North
Lanarkshire and associated Programme of Work. The corporate risk register is also
continually reviewed during the year to ensure it remains valid and up-to-date and
properly reflects both new and emerging risks and changes to existing risks. 
All corporate risks identified and agreed as meriting inclusion in the corporate risk
register are subject to regular monitoring and review by relevant senior management
and periodic review/consideration of individual risks by both the CMT and the Audit
and Scrutiny Panel in line with their respective governance roles.
• Corporate risk register for 2024/25 - August 2024: link to file 
Developments relating to the Corporate Risk Register since the last update are
reported to each cycle of the Audit and Scrutiny Panel.
• Latest quarterly risk management update - May 2025: link to file 
Latest version: August 2024.
Review timeframe: Annual.
Assessment: The Corporate Risk Register is key in
supporting the council’s Programme of Work and, as
such, is subject to an annual review and update
process.  Risks within the Corporate Risk Register
are on a regular programme of review and deep
dives into specific risks are frequently reported to
the Audit and Scrutiny Panel.
The most recent Corporate Risk Register (for
2024/25) was considered by the Audit and Scrutiny
Panel in August 2024.  
Quarterly risk management update reports continue
to be presented to the Audit and Scrutiny Panel
each cycle.
The Corporate Risk Register for 2025/26 is
scheduled to be reported to the Audit and Scrutiny
Panel in cycle 3 of 2025.
RAG: 
Chief Officer (Audit
and Risk)       ✓  ✓ ✓ ✓   ✓ ✓ ✓  ✓   
Service risk registers 
Each service is required to maintain a Service Risk Register in line with the Risk
Management Strategy.  The Strategy defines roles and responsibilities in this respect,
for example Risk Champions and Facilitators are identified for each service.  These
are noted on InsideNL: Risk Management. 
Service Risk Registers require to be reviewed and monitored by Service Management
Teams to ensure that service risk registers are complete and up-to-date, and that any
new and emerging risks are identified, assessed, and managed effectively.  
• Update in terms of the key service risks - February 2025: link to file 
Latest version: Ongoing.
Review timeframe: Registers are reviewed at
varying times within each service.
Assessment: Service risk registers are required to
be a standing item on all service management team
meetings.
Work was undertaken by the corporate risk section
in 2023 to supplement the corporate / strategic risk
register information included in the report to the
Audit and Scrutiny Panel with a summary of key
service risks from service risk registers to enable
Elected Members to have sight of those risks with
the highest residual risk scores.  This was first
referenced in the quarterly report  to the Audit and
Scrutiny Panel in November 2023 [ link to file ] and
included in the quarterly update in February 2024 [
link to file ]. Thereafter key service risks were
scheduled to be reported to the Panel every six
months.
RAG: 
Chief Officer (Audit
and Risk)       ✓  ✓ ✓ ✓   ✓ ✓ ✓  ✓   
Page 65 of 108

Page 66

38 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub-principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3 
Project risk registers
As part of the corporate Project Management Framework, all projects are required to
complete a Position Risk Assessment (PRA).  This is required to estimate the level of
risk within a project, both at an initial stage and at any other time during the life cycle
of the project. 
The PRA template and guidance is on InsideNL: Project Management Framework 
Latest version: Ongoing.
Review timeframe: Registers are reviewed at
varying times within each service / project /
programme.
Assessment: The approach to risk management
when managing projects was reviewed and updated
when the Project Management Framework was
subject to a significant review in 2022. The Position
Risk Assessment (PRA) documentation and
guidance were also reviewed and updated at that
time.
Quality assurance arrangements developed to
support the Project Management Framework
include an assessment in respect of the use of the
PRA documentation; this includes a key role for the
Audit and Scrutiny Panel for which the initial outline
was reported to the Panel in February 2024               
[ link to file ] and an annual assurance report in
February 2025 [ link to file ]. 
RAG: 
Chief Officer (Audit
and Risk)       ✓  ✓ ✓ ✓   ✓ ✓ ✓  ✓   
Complaints Handling Procedure
The Scottish Public Services Ombudsman (SPSO) have established a Local Authority
Model Complaints Handling Procedure which defines the two-stage process which the
council is required to implement when handling all complaints received.  The council
has implemented this procedure since it came into effect in April 2013.
• The procedure is available publicly on the council’s website:
https://www.northlanarkshire.gov.uk/your-council/complaints-and-feedback 
• An online portal for making complaints is also accessible from the website:
https://www.northlanarkshire.gov.uk/nlc-forms/complaint 
A key aspect of the Local Authority Model Complaints Handling Procedure is the
supporting complaints governance arrangements  in terms of reporting and publicising
complaints information that includes performance statistics, trends and outcomes, and
actions taken to improve services.  
• Performance in complaints handling - February 2024: link to file
• Complaints performance on the council’s website - April 2024:
https://www.northlanarkshire.gov.uk/your-council/complaints-and-
feedback/complaints-performance 
Latest version: February 2024.
Review timeframe: Annual.
Assessment: Information on the council’s
complaints handling procedure is published on the
website; this also contains links to the online portal
to allow for complaints to be made.  The website
also contains information on advocacy services for
those that need help to make a complaint.
The latest report in terms of the council’s
performance in handling complaints in line with the
Local Authority Complaints Handling Procedure was
reported to the Audit and Scrutiny Panel in February
2024.  An updated performance report is scheduled
to be reported to committee in cycle 3 of 2025. 
RAG: 
Chief Officer
(Strategy and
Engagement)
✓   ✓  ✓   ✓      ✓  ✓    
Audit and Scrutiny Panel
The activities and functions of the Audit and Scrutiny Panel ensures the council
complies with the standards set out in the CIPFA Position Statement: Audit
Committees in Local Authorities (2018).  As such, the purpose of the Audit and
Scrutiny Panel is to “provide independent assurance to the council and those charged
with governance on the adequacy of the council's risk management framework and
internal control environment” and its activities include providing an “independent
review of the council's governance, risk management, performance, and control
frameworks and oversees the financial reporting and annual governance processes” -
as set out in the Scheme of Administration (December 2024).   
The Panel’s specific duties in relation to the Annual Governance Statement are also
reflected in the Scheme of Administration, in that it is the Panel’s remit to “review the
Annual Governance Statement prior to approval and consider whether it properly
reflects the risk environment and supporting assurances, taking into account Internal
Audit’s opinion on the overall adequacy and effectiveness of the council’s framework
of governance, risk management and control.” 
The Audit and Scrutiny Panel is supported by a Scrutiny Work Programme which is
regularly reviewed and updated; this ensures that the scrutiny structures in the council
support members in reviewing and challenging its performance in line with Best Value
guidance.
• Scrutiny Work Programme - February 2025: link to file 
Meetings are held every cycle.
Minutes and meeting papers are available on the council’s website : link to files 
Latest version: Recurring Panel meetings.
Review timeframe: Review arrangements for the
Audit and Scrutiny Panel take place in line with the
Scheme of Administration.
Assessment: Scheme of Administration was
updated in December 2024 [ link to file ].
A self-evaluation of the Audit and Scrutiny Panel
was undertaken in 2023 and the resultant outcome
report and improvement plan was approved by the
Panel in November 2023 [ link to file ].  This
followed an Internal Audit review in 2021 which
recommended that the Audit and Scrutiny Panel
should, in line with good practice, periodically
undertake a self-evaluation of how effectively it is
discharging its role.
In December 2023, the Council meeting [ link to file ]
formally agreed one of the improvement actions in
respect of amending the governance arrangements
and removing the scope for substitute members to
attend Audit and Scrutiny Panel meetings given the
importance of Panel members having appropriate
training, knowledge, and understanding and
recognising the role that consistency in involvement
has in terms of ensuring ongoing Panel
effectiveness.  A follow up self-evaluation of the
Audit and Scrutiny Panel is underway and
scheduled to be reported in cycle 3 of 2025.
RAG: 
Chief Officer (Audit
and Risk) / Chief
Officer (Finance
and Technology) /
Chief Officer
(Strategy and
Engagement) / 
✓         ✓   ✓     ✓
Audit and inspection reports Latest version: Various. All Chief Officers    ✓         ✓   ✓     ✓ Page 66 of 108

Page 67

39 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub-principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
The council is subject to ongoing inspection work undertaken by a range of scrutiny
bodies.  This includes the work the council carries out in partnership with other public
bodies.  This inspection work provides an independent assessment of North
Lanarkshire's performance.   
The latest inspection reports are available from the council’s website:
https://www.northlanarkshire.gov.uk/your-council/performance-of-the-council/best-
value/independent-assessments 
Inspections during 2023/24 included the following:
• Scottish Housing Regulator annual assurance statement 2023/24 - August 2024:
link to file
• Scottish Housing Regulator annual landlord report 2023/24 - November 2024: link
to file
Review timeframe: These are set by the respective
external audit or inspection body.
Assessment: Audit and inspection reports are
reported to the relevant committee when received
by the council and uploaded to the website when
they are made publicly available by the relevant
body. 
RAG:
Best Value
A report to the Audit and Scrutiny Panel in February 2023  [ link to file ] advised on the
conclusion of the national approach to auditing Best Value through the BVAR process.   
This report also advised that a new national approach to auditing Best Value came
into effect as part of the external auditor appointments for the five-year term from
2022/23.  This approach is twofold and means that:
• Auditing Best Value is integrated within the wider scope of the external auditor’s
annual audit work which is reported in their Annual Audit Report (AAR). 
• Thematic Best Value audit work is undertaken each year by the external auditor as
per the Accounts Commission’s requirements to provide assurance on areas of
risk / interest across councils as at a defined point in time, thus enabling
comparisons across Scotland. 
Further updates update to the Audit and Scrutiny Panel in February 2024  [ link to file ]
and February 2025 [ link to file ] reported on the key findings from years one and two
of the thematic audits and advised of the theme for the year three audit. 
Since the new approach was implemented, the various outcome reports (listed below)
have been submitted to the Policy and Strategy Committee and/or Audit and Scrutiny
Panel: 
• 2022/23 Annual Audit Report (AAR) to Audit and Scrutiny Panel - October 2023:
link to file 
• 2023/34 Annual Audit Report (AAR) to Audit and Scrutiny Panel - October 2024:
link to file 
• 2022/23 outcome report on the theme in respect of the leadership of the
development of new strategic priorities was presented to the Audit and Scrutiny
Panel in October 2023 [ link to file ] and the Policy and Strategy Committee in
December 2023 [ link to file ].
• 2023/24 outcome report on the theme for workforce innovation (specifically how
the council is responding to current workforce challenges through building
capacity, increasing productivity, and innovation) was presented to the Audit and
Scrutiny Panel in August 2024 and then remitted to the Policy and Strategy
Committee in September 2024 [ link to file ]. 
The council’s Best Value reports are also available on the website:
• Council’s website: https://www.northlanarkshire.gov.uk/your-council/performance-
of-the-council/best-value/national-audit-results 
Latest version: October 2024.
Review timeframe: Annual.
Assessment: Following the conclusion of the
national five year Best Value Assurance Report
(BVAR) process, a new national approach to
auditing Best Value came into effect as part of the
external auditor appointments for the five-year term
from 2022/23.  This approach means that each year
the council undergoes an assessment of particular
aspects of Best Value in order to provide the
Accounts Commission with the relevant assurances
in terms of performance and the quality of services
to the public. 
Outcome reports from Best Value audits have been
submitted to the Audit and Scrutiny Panel in cycle 3
each year and the Policy and Strategy Committee
thereafter.  The outcome report from the 2025 Best
Value audit is scheduled to be reported in cycle 3 of
2025.
RAG: 
Chief Executive /
Chief Officer
(Strategy and
Engagement)
✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
Internal Audit 
The External Quality Assurance Review (EQAR) of a local authority’s Internal Audit
function assesses the function’s compliance with the Public Sector Internal Audit
Standards (PSIAS). The PSIAS includes core principles, a code of ethics and a
number of operational standards with which Internal Audit functions are expected to
comply. An important element of the PSIAS is a requirement for regular self-
evaluation, but in addition, the PSIAS also require an independent external quality
assurance review (EQAR) to be conducted at least once every five years and reported
to key stakeholders including senior management and the audit committee. 
• Internal Audit External Quality Assurance Review (EQAR) - May 2024: link to file 
The Internal Audit Charter is a formal document that defines Internal Audit’s purpose,
authority, and responsibility. It establishes Internal Audit’s position within the council,
including the nature of the functional reporting relationship with senior management
and the Audit and Scrutiny Panel; authorises access to records, personnel, and
physical properties relative to the performance of audit engagements; and defines the
scope of Internal Audit activities. Although the Charter is discussed and agreed with
senior management (including the Chief Executive), final approval of the Internal Audit
Latest version: Recurring function.
Review timeframe: Annual.
Assessment: The annual Internal Audit report
provides an update on compliance with corporate
governance and is a key item of evidence for the
Annual Governance Statement.
Various audit outputs are a standing item on the 
Audit and Scrutiny Panel agenda during the year.
Reports submitted to the Audit and Scrutiny Panel
each cycle provide a range of independent
assurance outputs (in line with the approved Internal
Audit Strategy and Annual Plan) focused on cyclical
coverage of core corporate governance processes,
key strategic priorities and programmes of work, key
corporate risks, and key financial systems.  
An item within the Strategic Policy Framework, the
Internal Audit Strategy was reviewed and an update
for 2024-25 to 2026-27 was reported to the Audit
and Scrutiny Panel in October 2024.  
Chief Officer (Audit
and Risk)    ✓            ✓     ✓
Page 67 of 108

Page 68

40 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub-principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
Charter resides with the Audit and Scrutiny Panel. 
• Internal audit charter - May 2025: link to file
• Internal audit charter - August 2024: link to file 
The Internal Audit Strategy (Strategy) is a formal document that defines Internal
Audit’s strategic objectives and outlines how these will be achieved. While the current
Public Sector Internal Audit Standards (PSIAS) have no requirement for Internal Audit
functions within local authorities to have an Internal Audit Strategy, it is considered that
such a statement benefits both key stakeholders and Internal Audit staff, providing a
clearer overview of what Internal Audit is trying to achieve, and how, and by
establishing key principles against which the performance of Internal Audit can be
assessed.
• Internal audit strategy - October 2024: link to file
• Internal audit strategy - June 2019: link to file 
Internal Audit activity is governed by policies, procedures, rules, and regulations
established by the council including the council’s Financial Regulations and Internal
Audit Charter. The Internal Audit service is expected to comply with the standards laid
down by the Public Sector Internal Audit Standards (PSIAS). The planned work of the
Internal Audit service is outlined in the Internal Audit Annual Plan, which is submitted
to, and approved by, the Audit and Scrutiny Panel annually. Any proposed programme
of work must be appropriate and sufficient to support the preparation of an opinion by
the Chief Officer (Audit and Risk) on the overall soundness of the council’s corporate
governance, risk management and internal control systems.
• Internal Audit annual plan 2025/26 - May 2025: link to file
• Internal Audit annual plan 2024/25 - May 2024: link to file
• Internal Audit annual plan 2023/24 - May 2023: link to file
• Internal Audit annual plan 2022/23 - September 2022: link to file 
The Public Sector Internal Audit Standards and the Council’s Internal Audit Charter
require the Chief Officer (Audit and Risk) to provide the Audit and Scrutiny Panel (and
the Chief Executive and CMT) with an annual summary of the work undertaken by
Internal Audit and to provide an annual independent opinion on the council’s corporate
governance, risk management, and internal control arrangements.
• Internal Audit annual report 2023/24 (and annual opinion) - June 2024: link to file
• Internal Audit annual report 2022/23 (and annual opinion) - June 2023: link to file
• Internal Audit annual report 2021/22 (and annual opinion) - September 2022: link to
file 
To support the Annual Governance Statement, the council is required to demonstrate
compliance with the CIPFA Statement on the role of the Head of Internal Audit in
public service organisations (2019).  This assurance is provided through the Strategic
Governance Framework which sets out the role of Internal Audit and depicts in a
diagram the steps in the annual review process which informs the content of the
Annual Governance Statement.  The Strategic Governance Framework undergoes a
review and refresh exercise each year to ensure it remains up to date in reflecting the
council’s governance arrangements and it is reviewed and endorsed annually by the
council’s senior management team. 
The results of the latest EQAR were reported to the
Audit and Scrutiny Panel in May 2024, this is a
process which is undertaken every 5 years.
The Internal Audit annual plan for 2025/26 was
reported to the Audit and Scrutiny Panel in May
2025.
The Internal Audit annual report for 2024/25 (and
annual opinion) is scheduled to be reported to the
Audit and Scrutiny Panel in June 2025.
RAG: 
Corporate governance audits
Internal Audit regularly review the council’s corporate governance arrangements to
provide independent assurance on the adequacy and effectiveness of the council’s
arrangements for ensuring that it complies with the principles of the CIPFA/SOLACE
Delivering Good Governance in Local Government Framework (2016). 
• Audit on corporate governance - August 2024: link to file
• Audit on corporate governance principles C and D - May 2023: link to file
• Audit on corporate governance principles A and B - March 2022: link to file
• Audit on corporate governance principles E, F, and G - March 2021: link to file 
• Internal Audit annual report 2023/24 (and annual opinion) - June 2024: link to file
• Internal Audit annual report 2022/23 (and annual opinion) - June 2023: link to file
• Internal Audit annual report 2021/22 (and annual opinion) - September 2022: link to
file 
Latest version: August 2024.
Review timeframe: Annual.
Assessment: An Internal Audit is undertaken on an
annual basis that focuses on specific principles of
corporate governance (in line with the Delivering
Good Governance in Local Government
Framework).  Findings and areas for improvement
in this respect are reported to the Audit and Scrutiny
Panel.  
Reports in respect of the Internal Audit annual
opinion have to date stated that the results from the
detailed internal audit work examining the council’s
corporate governance arrangements suggest that
compliance with the requirements of the corporate
governance framework adopted by the council
continue to be positive with no significant
weaknesses or areas of concern highlighted.
RAG: 
Chief Officer (Audit
and Risk) ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
External auditor’s annual audit report (AAR)
The Accounts Commission have appointed Audit Scotland as the council’s appointed
external auditor.  Expected outputs to be produced by the council’s external auditors
Latest version: October 2024.
Review timeframe: Annual.
Assessment: Draft Annual Audit Report (AAR) for
the council was considered by the Audit and
Chief Officer (Audit
and Risk) / Chief
Officer (Finance
and Technology) /   
✓            ✓  ✓   ✓
Page 68 of 108

Page 69

41 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub-principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
are outlined each year in their annual planning document.  This includes a
requirement that the external auditor annually prepare a report for Elected Members
and the Controller of Audit summarising the audit work done and presenting the main
findings arising from the audit work. 
The external auditor’s report presents key matters arising from each of the main areas
of work undertaken by the external auditor, including the audit of the financial
statements and issues relating to the council’s financial management, financial
sustainability, governance, and best value arrangements. 
• Draft AAR for 2023/24 was considered by the Audit and Scrutiny Panel in October
2024: link to file
• Final AAR for 2023/24 was published by Audit Scotland in January 2025; links to the
council and IJB AAR are on the council’s website:
https://www.northlanarkshire.gov.uk/your-council/performance-of-the-council/best-
value/independent-audits 
Scrutiny Panel in October 2024 with the final version
for the council and the IJB published on the Audit
Scotland website in January 2025 and December
2024 respectively.
The Annual Audit Report (AAR) for 2024/25 is
scheduled to be reported to the Panel in the autumn
of 2025.
RAG: 
Chief Officer
(Strategy and
Engagement)
ALEOs’ governance and risk management oversight and assurance 
The council’s arm’s length external organisations (ALEOs) complete an annual
Certificate of Assurance and update the accompanying Checklist to support the
preparation of the council’s statements on corporate governance and internal financial
control. 
In setting its budget on 15 February 2024, the Council requested that the remaining
ALEOs (Fusion Assets Limited, Routes to Work Limited and North Lanarkshire
Properties LLP) be formally reviewed, with their contributions to the council’s strategic
priorities and The Plan for North Lanarkshire, both now and in the future, assessed.
This review was undertaken during 2024/25 with the outcome reported to the Policy
and Strategy Committee in March 2025.  
• Aleo’s review - March 2025: link to file
Latest version: March 2025.
Review timeframe: Annually.
Assessment: Each of the council’s remaining
ALEOs (Fusion Assets Limited, Routes to Work
Limited, and North Lanarkshire Properties have
completed the annual Certificate of Assurance and
Checklist.
RAG:  
Chief Officer (Place)
/ Chief Officer
(Assets and
Procurement) /
Chief Officer
(Children, Families,
Justice and
Integrated Practice)   
✓          ✓  ✓  ✓ ✓  ✓
Community Planning Partnership - Strategic Leadership Board
The Strategic Leadership Board supports the council and the Community Planning
Partnership to ensure there is effective governance and collaborative arrangements in
place in line with Best Value legislation.  This includes structures with clear lines of
responsibility and accountability, clear roles and responsibilities, and agreement
around priorities. 
Information is available on the council’s website: 
• Community planning: https://www.northlanarkshire.gov.uk/your-
community/working-communities/your-area/getting-involved-your-community 
• Strategic Leadership Board: https://www.northlanarkshire.gov.uk/your-
community/strategic-leadership-board - meetings are held approximately every
10-12 weeks; minutes of Strategic Leadership Board meetings are published on
the website. 
An annual report to committee provides an update on activities undertaken by the
North Lanarkshire Community Planning Partnership Board each year in order to
demonstrate where partnership working is making a significant contribution to
improving local outcomes and ensuring compliance with statutory requirements.
• Annual report 2023/24 - February 2025: link to file
• Annual report 2022/23 - February 2024: link to file
• Annual report 2021/22 - February 2023: link to file
Latest version: Recurring group.
Review timeframe: As required.
Assessment: The latest annual report for 2022/23
was  approved at the Communities Committee in
February 2024.
The Framework for Demonstrating Improved
Outcomes for Communities was formally approved
by the Strategic Leadership Board in June 2022. 
This sets out the performance arrangements in line
with the partnership’s programme of work,
strategies, policies, and plans, and strategic and
local delivery requirements and includes a reporting
timetable.
A self-evaluation of Partnership / Community Board
effectiveness in line with their role in improving
outcomes for local people and communities was
undertaken during 2023 (as noted in the item for
Community Boards below).  An update in this
respect was included in a report to the Audit and
Scrutiny Panel in May 2024 [ link to file ].
RAG: 
Chief Officer
(Strategy and
Engagement)    
✓ ✓ ✓ ✓ ✓ ✓  ✓         
Community Boards
Community Boards are part of the structure supporting the Community Planning
Partnership in North Lanarkshire and the implementation of the Local Outcome
Improvement Plans.  The overall governance of Community Boards and local
outcomes rests with the Strategic Leadership Board of the North Lanarkshire
Partnership; not the council alone. 
• Latest Community Boards and partnership communication strategy - April 2025:
link to file
• Latest Local Outcome Improvement Plan performance report - February 2025: 
link to file
• Establishment of Community Boards - March 2020: link to file 
• Governance arrangements - April 2020: link to file
• Community Matters - a framework for working with communities - August 2019:
link to file 
Community Board information and dates of meetings on the council’s website - last
updated May 2025: https://www.northlanarkshire.gov.uk/your-community/working-
communities/your-area/community-boards 
Latest version: April 2025.
Review timeframe: Meetings are ongoing.
Assessment: All Community Boards are operational
and supported by a Chief Officer in the role of
Community Co-ordinator; a schedule of meetings is
in place which is updated regularly.
Local Outcome Improvement Plans are in place for
each of the 9 Community Board areas.
A report providing an update on the work of the
Community Boards and the partnership
communication strategy is submitted to the
Communities Committee each cycle.  
Local Outcome Improvement Plan performance
reports are regularly submitted to the Communities
Committee.
A review of corporate governance by Internal Audit
in March 2021 [ link to file ] recommended that, after
allowing a sufficient period of time for the model and
individual Boards to become established, a formal
review (or self-assessment) of the effectiveness of
Chief Officer
(Strategy and
Engagement) 
✓ ✓ ✓   ✓ ✓  ✓         
Page 69 of 108

Page 70

42 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub-principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
Local Outcome Improvement Plans: https://www.northlanarkshire.gov.uk/your-
community/working-communities/your-area/local-outcome-improvement-plans-loips 
the Community Boards should be undertaken.  This
work was combined with a self-evaluation of the
Strategic Leadership Board and an update included
in the annual frameworks position statement report
to the Audit and Scrutiny Panel in November 2023  
[ link to file ].  A subsequent report to the Audit and
Scrutiny Panel in May 2024 [ link to report ] set out
the background to the Boards, highlighted the
partnership work underway to support the
Community Boards model and delivery of Local
Outcome Improvement Plans, and advised of the
self-evaluation to assess the effectiveness of the
governance and delivery arrangements in place to
support community planning at both a strategic and
a community level.
An item within the Strategic Policy Framework,
Community Matters (the framework for working with
communities) is next scheduled for review in 2025 in
line with the partnership communications strategy
and implementation of the findings from the 
community planning / Boards self-evaluation
exercise undertaken in 2023.  The update is
scheduled to be reported to the Communities
Committee by the end of 2025/26.
RAG: 
Boards and working groups
A range of programme / project boards and working groups, aligned to the delivery
(and governance) of specific Programme of Work items, are in operation, e.g.
Strategic Capital Delivery Group, Hub Delivery Programme Board, and Data
Governance Board. 
Meetings frequency differs for each Board, but generally meetings are held every 6-8
weeks.  Minutes and meeting papers available.
Latest version: Recurring groups.
Review timeframe: Membership and terms of
reference reviewed and updated as required.
Assessment: 
A review of the council’s Boards and working groups
was undertaken during 2023/24 as part of the
development of the governance arrangements for
the new Programme of Work to 2028.  The
governance framework supporting the Programme
of Work sets out the structure in this respect.
RAG: 
All Chief Officers    ✓ ✓    ✓ ✓  ✓ ✓ ✓  ✓     
Serious Organised Crime / Counter Terrorism (SOC / CT) working
group
Serious organised crime and the threat of terrorist attacks continue to present
significant challenges to the council in it seeking to protect Elected Members,
employees, physical assets, public funds, and the information it holds from the risks of
infiltration and attack. 
The council's physical and cyber security is a priority so as to ensure that it is not
exposed to any incident which gives rise to loss of life or injury, financial loss, or
reputational damage. 
Meetings are held quarterly.
Minutes and meeting papers available.   
Regular updates are also provided to the council’s CMT and communications are
issued to all staff as required. 
A NLC Announcement was issued in May 2024 reminding staff of the requirements to
be adhered to in respect of building security and safety.
Latest version: Recurring group.
Review timeframe: The Chief Officer (Legal and
Democratic) is the Single Point of Contact (SPOC)
for the council’s working group as well as the
Lanarkshire multi-agency group. 
Assessment: A process is established through the
SPOC to ensure ongoing review of all controls
either in place or assessed as being necessary. 
This is particularly important given the ever
changing and developing environment in which
these risks operate.  A specific review on the
council’s activities and measures to safeguard
against serious organised crime and terrorism
attacks was undertaken during 2022 and the
outcome was reported to the Policy and Strategy
Committee in September 2022 [ link ].  This work
continues to be undertaken throughout each year
and is reported on an annual basis, with the latest
report submitted to the Policy and Strategy
Committee in March 2024 [ link ].
Moving forward it is worth noting that Serious
Organised Crime is a Scottish Government strategy
while Counter Terrorism is national and, as such,
discussions are underway regarding a future
separation.  
RAG: 
Chief Officer (Legal
and Democratic) ✓ ✓ ✓ ✓            ✓     
Corporate Resilience Plan
Dedicated section on InsideNL for business continuity and disaster recovery: 
• Corporate Resilience Plan - June 2021, this is available on InsideNL: link to file 
• Update - November 2022: link to file
• Update - November 2021: link to file 
Latest version: June 2021
Review timeframe: As required.
Assessment: An update in respect of the Corporate
Resilience Plan was reported to committee in
November 2022.
RAG: 
Depute Chief
Executive    ✓     ✓ ✓      ✓     
Page 70 of 108

Page 71

43 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub-principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3 
Corporate Resilience Group
Meetings are held approximately every 8 weeks.
Minutes and meeting papers available.   
Latest version: Recurring group
Review timeframe: Corporate Resilience Group in
operation; chaired by Chief Officer (Community
Operations).
Assessment: Effectiveness of the group is
reviewed in line with the council’s Corporate
Resilience Plan.  
RAG: 
Depute Chief
Executive    ✓     ✓ ✓      ✓     
Corporate Business Continuity Plan / service Business Continuity
Plans
In line with The Civil Contingencies Act (Contingency Planning) (Scotland) Regulations
2005, (and Best Value), businesses are required to have continuity planning measures
in place in order to survive and continue to thrive while working towards keeping an
incident as minimal as possible. In accordance with the Act, the council has a duty to
make relevant provisions, and this forms an important part of the council’s resilience
development functions.   
• Business continuity guidance notes on InsideNL - April 2024: link to file 
Latest version: April 2024.
Review timeframe: Annual.
Assessment: It is the responsibility of each service
within the council to detail their specific business
continuity arrangements which would be enacted,
as appropriate, to mitigate the impact of an
emergency.  Chief Officers are required to review
and update their Business Continuity Plans
annually.  Chief Officers are also required to
complete a business continuity annual assurance
return which has been incorporated into the Chief
Officer annual Certificate and Checklist process
since the 2023/24 year-end. 
An Internal Audit was undertaken on Business
Continuity Planning in September 2022 [ link to file ]. 
This identified a number of recommendations for
action.  A subsequent Internal Audit was undertaken
on Business Continuity Planning in May 2025 [ link
to file ] which included an update on the progress
made in implementing the previous audit’s
recommendations. This was reported to the Audit
and Scrutiny Panel in May 2025.
RAG: 
Depute Chief
Executive    ✓     ✓ ✓      ✓     
Power Resilience Strategy
Black Start event is the name for the recovery process following a complete (or partial)
shutdown of the Great Britain electricity system (National Electricity Transmissions
Failure) where the planning assumption is that full power restoration could take up to
seven days.  The planning arrangements for such a recovery process are described
under the term Power Resilience. Within the last United Kingdom Government
National Risk Assessment, Black Start is rated as a medium likelihood with significant
impacts. 
The council has well documented and comprehensive business continuity planning
measures in place, all of which are based on the assumption that there will be a
national power supply available. As a consequence, the Scottish Government
requested that in addition to normal business continuity arrangements all public bodies
should also have a stand-alone Power Resilience Strategy which would be enacted in
the event of any failure of the national grid system. 
• A Power Resilience Strategy was developed for the council and approved at
committee in February 2023: link to file
• Update - October 2024: link to file
Latest version: October 2024.
Review timeframe: An update on the council’s
arrangements relevant to Power Resilience Strategy
and Business Continuity was reported to the
Environment and Climate Change Committee in
October 2024.
Assessment:  A fundamental principle of any
resilience response is the review phase where the
purpose is to highlight areas of improvement in the
overall response to an incident, identify their cause
and introduce changes which will prevent a
recurrence in any future response.  To complement
this review process, which the council undertakes
as a matter of course, an internal audit review was
undertaken and the update to the Environment and
Climate Change Committee in October 2024 [ link to
file ].  This also provides an update in respect of the
recommendations arising from this audit as does the
report to the Audit and Scrutiny Panel in May 2025
after a follow up internal audit [ link to file ].
RAG: 
Depute Chief
Executive    ✓     ✓ ✓      ✓     
ICT Disaster Recovery
Corporate responsibility for Disaster Recovery Planning within the council lies with the
Information Security and Risk team and the council’s ICT Disaster Recovery
arrangements comprise IT application / system Disaster Recovery Plans and a
separate ICT Major Incident Plan, which focuses on the ICT response elements of
major systems breach. The ICT Disaster Recovery Plans provide detail on the
recovery of IT systems which are council-owned.
Latest version: October 2024.
Review timeframe: Ongoing.
Assessment:  A review of the council’s
arrangements in respect of Business Continuity and
ICT Disaster Recovery was included in the external
auditors Annual Audit Report for 2023/24 which was
reported to the Audit and Scrutiny Panel in October
2024 [ link to file ]. This audit report recommended
an improvement for action which is scheduled to be
implemented during 2025/26.
An Internal Audit review was undertaken on
Business Continuity Planning in September 2022 [
link to file ].  This identified a number of
recommendations for action.  A subsequent Internal
Chief Officer
(Finance and
Technology) / Chief
Officer (Legal and
Democratic)                     
Page 71 of 108

Page 72

44 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub-principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
Audit was undertaken on Business Continuity
Planning in May 2025 [ link to file ] which included
an update on the progress made in implementing
the previous audit’s recommendations and made
new recommendations, including the need to better
align business continuity and disaster recovery
which is scheduled to be implemented during
2025/26. This was reported to the Audit and
Scrutiny Panel in May 2025.
RAG: 
Leadership and Operating Model
The Leadership and Operating Model aims to ensure a unified approach to maintain
effective management, operation, and governance structures within each Hub.  The
model aims to ensure that town and community hubs operate as a single entity and
support a much wider integrated community offer - with communities having more
direct access to the services they need and staff closer to the communities they work
in.  This unified approach puts communities at the heart of the council’s model and
seeks to ensure everyone is given equality of opportunity and individuals are
supported, encouraged, and cared for at each key stage of their life. Engagement with
local communities and groups is a key part of the development of the leadership and
operating model for the Hub programme. 
Progress updates
• June 2025: link to file
• December 2024: link to file
• June 2024: link to file
• March 2023: link to file 
December 2021: link to file
Latest version: June 2025.
Review timeframe: Annual.
Assessment: A three phased approach to the
model over a 10 year period was initially approved
in December 2021.  Progress updates have been
reported to the Policy and Strategy Committee on a
regular basis since. 
RAG: 
Chief Officer
(Strategy and
Engagement)   
✓   ✓ ✓  ✓     ✓      
Economic outcomes
The Delivering Good Governance in Local Government: Framework positions the
attainment of sustainable economic outcomes as a key focus of governance
processes and structures.  The Plan for North Lanarkshire has as its centre a vision
for inclusive growth and prosperity for all with one of the five priorities being to improve
economic outcomes and opportunities. 
More specifically,  the Economic Regeneration Delivery Plan (ERDP) is a high-level
framework which is aligned to the composite capital programme and delivers on the
priority of The Plan for North Lanarkshire to improve economic outcomes and
opportunities. This will be achieved by delivering an integrated approach to investing
in four key inter-related areas coherently across the organisation - housing supply,
town centres, business and industry, and infrastructure. 
• Economic Regeneration Delivery Plan (ERDP) 2023 to 2028 - February 2023: link
to file 
• Action plan for 2025/26 - February 2025: link to file
• Governance arrangements for the ERDP are supported by an annual performance
report - August 2024: link to file
Latest version: August 2024.
Review timeframe: The Economic Regeneration
Delivery Plan (ERDP) covers the period from 2023
to 2028.  The ERDP is supported by an action plan
and a performance report updated and reported to
committee annually.
Assessment: An item within the Strategic Policy
Framework, the ERDP for 2023 to 2028 was
approved in February 2023.  The supporting action
plan for 2025/26 was reviewed and updated in
February 2025.  The ERDP itself will be reviewed
and updated in 2027/28 when it reaches the end of
its current life.
RAG: 
Chief Officer (Place)    ✓   ✓ ✓  ✓     ✓      
NL Connect
NL Connect is an opportunity for residents to share their views, help inform council
priorities, and shape the future of North Lanarkshire.
https://www.northlanarkshire.gov.uk/your-community/working-communities/nl-connect 
Latest version: Live process
Review timeframe: As required
Assessment: Ongoing mechanism for local
engagement.
RAG: 
Chief Officer
(Strategy and
Engagement)   
✓ ✓ ✓   ✓            
Tenant engagement and participation
The Housing (Scotland) Act 2001 introduced the first legal framework for tenant
participation in Scotland. Section 53 (1) of the 2001 Act sets out the statutory
requirement for social landlords to develop and publish a Tenant Participation Strategy
in consultation with tenants. 
The Housing (Scotland) Act 2010 places additional duties on social landlords to
involve both tenants and other customers in housing and related services with the
introduction of the Scottish Social Housing Charter (SSHC). 
The Tenant Participation Strategy 2020-25 (Involving Tenants - Improving Services)
replaces the previous strategy and is the main source of information regarding tenant
participation; it outlines opportunities to participate in the monitoring and development
of the housing service.  The aim of this strategy is to continue to develop and improve
how the council communicates with tenants and residents and ensure opportunities
Latest version: Strategy for 2025-30 approved in
November 2024.
Review timeframe: Strategy will be reviewed and
updated when it reaches the end of its current life.  
Assessment: The report to committee in November
2024 saw the approval of the new 5 year strategy
for 2025-30 and the corresponding action plan.  This
strategy is also available on the council’s website.
An item within the Strategic Policy Framework, the
Strategy is subject to a regular review and progress
on the delivery of the action plan which is reported
to committee annually.  The Strategy will be
reviewed and updated in 2030 when it reaches the
end of its current life.  
RAG: 
Chief Officer
(Housing)     ✓ ✓ ✓               
Page 72 of 108

Page 73

45 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub-principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
are provided for participation and involvement that are accessible to all. 
• Tenant Participation Strategy on the council’s website: Involving Tenants -
Improving Services 
• Tenant Participation Strategy 2025-30 - November 2024: link to file
Members induction
A range of materials are available through various platforms. 
Report to committee in March 2022 updated on the work undertaken to develop
appropriate arrangements for the induction and training of Elected Members following
the May 2022 local government elections.   
This also outlined the induction programme for May and June 2022: link to file. 
Latest version: Full induction programme in place
for new and returning Elected Members following
the local government elections in May 2022.  
Review timeframe: Programme is reviewed as a
matter of course in line with the local government
elections timetable.  New Members, following by-
elections, also take part in an induction process.
Assessment: Report to committee in March 2022
concluded on the review of the governance and
induction and training arrangements.
A full programme for the induction of Elected
Members commenced immediately following the
Council elections in early May 2022 and was
timetabled to run for approximately 6 weeks.
The take-up by Elected Members was low, and a
downward trend of attendance was experienced. 
The Chief Executive took the decision to terminate
the programme with the proviso that important
aspects and subjects would be incorporated into the
ongoing Elected Members training and development
programme.  The training and development
programme is up and running with a number of
sessions already completed and more planned
going forward; each session is dedicated to a
specific topic. 
A review of the programme and its uptake will be
carried out during the second half of 2025 and a
refreshed approach to encourage greater take up
will be developed in conjunction with Legal and
Democratic.
RAG:  
Chief Officer
(People Resources) 
/ Chief Officer
(Legal and
Democratic)
✓ ✓ ✓         ✓ ✓        
Elected Members training and development
LearnNL provides an online portal for all Elected Members training and development
needs, as well as an induction programme for new Elected Members.   
• LearnNL: https://learnnl.learningpool.com/totara/dashboard/index.php
Latest version: Learning site for Elected Members
went live on LearnNL in June 2021.
Review timeframe: Programme on LearnNL is
reviewed for effectiveness on an ongoing basis.
Assessment: The LearnNL site comprises an
Elected Members development programme and
provides access to a range of information, materials,
e-learning, and sessions on live topics as well as
the offer of 1:1s with the Training and Development
team.
RAG:  
Chief Officer
(People Resources) 
/ Chief Officer
(Legal and
Democratic)
✓ ✓ ✓         ✓ ✓        
Employee Performance Review and Development (PRD)
An enhancement to LearnNL in 2023 saw the introduction of myPRD - the
Performance Review and Development (PRD) conversation. This focuses on the
setting out of personal objectives and identifying any development opportunities which
will help achieve those objectives. 
A range of supports are available to help employees get the most from myPRD
conversations, as a member of staff or as a line manager. 
• LearnNL: https://learnnl.learningpool.com/course/view.php?id=1990 
Latest version: June 2023
Review timeframe: As required.
Assessment:  As per an Internal Audit Corporate
Governance report to the Audit and Scrutiny Panel
in May 2023 [ link to file ], the PRD process has
been reviewed and the Learn NL system
functionality has been enabled to allow staff to
record their PRD conversations.  Following an initial
pilot of the new system earlier in 2023, a report was
considered by the BMT in May 2023 to agree the full
roll out and launch of the PRD process and
supporting system.
NLC announcements in June 2023 and November
2023 publicised the new PRD process on LearnNL.  
RAG: 
Chief Officer
(People Resources) ✓ ✓          ✓ ✓        
Employee training and development
LearnNL provides an online portal for all employee training and development needs,
as well as an induction programme for new staff.   
A calendar of activity in LearnNL supports a range of employee learning and
Latest version: LearnNL went live in June 2020.
Review timeframe: Ongoing.
Assessment: Review of learning assets and digital
learning infrastructure completed and LearnNL went
live in June 2020.  This digital learning platform
Chief Officer
(People Resources) ✓ ✓          ✓ ✓        
Page 73 of 108

Page 74

46 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub-principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
development opportunities and a blended approach.
https://learnnl.learningpool.com/login/index.php
aims to improve the ability to reach and provide
enhanced learning provision to all employees.
Leadership and management development
provision was revitalised through the LearnNL
Leadership Academy which provides bespoke
development programmes for managers to gain
specific development for future leadership roles.  
The e-learning offer was refreshed in line with
individual and organisational needs and updated
mandatory e-learning modules were introduced (for
data protection essentials, information security
awareness, records and information management,
introduction to risk management, conflicts of
interest, prevent, introduction to first aid, fire safety,
and the employee code of conduct).  
Both the BMT and CMT have maintained ongoing
oversight and management during 2023/24 and
2024/25 in terms of employees completing the
mandatory e-learning modules. An update was also
considered by the Audit and Scrutiny Panel at their
meeting in May 2023 [ link to file ] and the approach
endorsed.
RAG: 
Workwell NL
Available to all employees, this platform provides benefits and discounts, health and
well-being support, and learning and development opportunities.  This is available
through the council’s internal Workwell North Lanarkshire portal. 
• Workwell provision update - May 2021: link to file 
Latest version: Ongoing resource for employees.
Review timeframe: As required.
Assessment: Update on the Workwell provision
was reported to committee in May 2021.  
NLC Announcements in July 2023 provided an
update in terms of the Wokwell provisions available
through the platform.  Regular updates / news
articles continue to be regularly provided to staff
through Viva Engage (formerly Yammer).
RAG: 
Chief Officer
(People Resources) ✓ ✓          ✓ ✓        
Employee engagement and wellbeing
The workforce Mental Health and Wellbeing Strategy was developed in full partnership
and agreement with Trade Union Colleagues and approved in September 2019. In
May 2020 the strategy was launched during Mental Health Awareness Week. Since
then, efforts have continued to ensure appropriate supports have been put in place in
response to the pandemic and in the aftermath. 
• Mental health and wellbeing strategy update - September 2024: link to file
• Mental health strategy update - October 2023 : link to file
• Employee mental health and wellbeing update - October 2022: link to file 
Investors in People is the internationally recognised industry standard for people
management that sets out and measures the extent to which organisations are able to
drive high levels of performance and employee engagement.  The council’s employee
engagement plan is fully aligned to the Investors in People framework. The framework
is also used to benchmark council practices against those of other leading
organisations.
• Enhancing employee engagement, leadership, and culture to embed the future
workplace and operating model - December 2021: link to file
• Employee engagement and wellbeing - May 2021: link to file 
Recognising that hybrid working would apply to less than 10% of the workforce, the
council implemented its first temporary hybrid working scheme (due to the pandemic)
from April 2022 for an initial period of 12 months. Implementation of the scheme was
based on manager, staff, and trade union consultation.  Staff continued to be surveyed
during the operation of the scheme with further engagement sessions held through
Operational Management Team meetings: 
• Workplace model - December 2021:  link to file 
This led to the development of the next steps for the hybrid working scheme which
were implemented from April 2023 for 12 months.  This report set out a further
commitment to explore opportunities for a permanent scheme (for implementation
from April 2024).
• Extension to the hybrid working scheme - March 2023: link to file 
Final changes to the hybrid working scheme were developed into a more permanent
solution which was approved in February 2024. This scheme was further determined
Latest version: Various.
Review timeframe: As required.
Assessment: An update on the council’s workforce
mental health and wellbeing strategy was reported
to Finance and Resources Committee in September
2024.
A report to committee in May 2021 provided an
update in terms of employee engagement and
wellbeing.  
A report to committee in December 2021 confirmed
that the council had met the requirements of the
Investors in People Standard with accreditation
awarded at silver level.
Following an interim approach, the final changes to
the Hybrid Working Scheme were developed into a
more permanent solution which was approved by
the Finance and Resources Committee in February
2024.
The council is currently developing a revised
employee survey approach which better aligns to
the dimensions of fair work in line with the Fairer
Scotland Duty and a report will be provided to
committee in due course.  In the meantime, a pilot
version of this has been developed and will be
tested during 2025 before final approval at
committee.  This will replace the current Investors in
People employee survey.  
Following the national Best Value thematic audit in
2024 on workforce innovation, improvements were
recommended in respect of acting on staff
feedback, monitoring the impact of the hybrid
working approach, and including reporting on
temporary workforce data. These are expected to
be implemented by the end of 2025/26. 
The Best Value outcome report in this respect was
submitted to the Audit and Scrutiny Panel in August
2024 [ link to file ].
Chief Officer
(People Resources) ✓ ✓          ✓ ✓        
Page 74 of 108

Page 75

47 
Name of element or mechanism with a brief description and links to relevant
documentation
Current  position including review timeframe
and date of next update (where appropriate),
with assessment and RAG status
Chief Officer
responsible 
7 principles and 21 sub-principles
A B C D E F G
A1 A2 A3 B1 B2 B3 C1 C2 D1 D2 D3 E1 E2 F1 F2 F3 F4 F5 G1 G2 G3
by the necessity to ensure that the productivity, motivation, and development of staff
remains key to the council’s success while allowing the council to support and serve
its local communities in a way that is representative of a modern and evolving local
authority. 
• Hybrid working scheme - February 2024: link to file 
The national Best Value thematic audit in 2024 focussed on workforce innovation and
how councils are responding to workforce challenges.  This report highlights a large
area of activity across the council, e.g. in respect of the council’s workforce strategy
and priorities, digital technology and the workforce, flexible working, innovative staff
deployments, skills and capacity, joint workforce arrangements, and measuring the
impact of workforce planning.
• Best Value outcome report - August 2024: link to file
RAG: 
Page 75 of 108

Page 76

Page 76 of 108

Page 77

North Lanarkshire Council
Report
Audit and Scrutiny Panel 
Does this report require to be approved? ☒ Yes   ☐ No
Ref SP/SL Date 26/06/25 
Annual Governance Statement 2024/25 
From  Stephen Penman, Chief Officer (Strategy and Engagement)  
E-mail PenmanSte@northlan.gov.uk Telephone 07947 997750 
Executive Summary
The Audit and Scrutiny Panel is aware that the council is required to produce an Annual
Governance Statement in line with the Local Authority Accounts (Scotland) Regulations
2014.  This Statement requires to be included within the council’s Annual Accounts and is
subject to review by the external auditors as part of their year-end Annual Audit Report
(AAR) process. 
The Annual Governance Statement for 2024/25, attached as Appendix 1, outlines the
council’s governance arrangements for the last financial year and demonstrates how the
council complies with the CIPFA Delivering Good Governance in Local Government:
Framework (2016).  It also supports the council’s Best Value duty in terms of securing
continuous improvement. 
The Annual Governance Statement has been prepared with evidence gathered from 11
different sources of assurance.  This includes:
• The annual opinion from the Chief Officer (Audit and Risk) which provides independent
and objective assurance as to the adequacy and effectiveness of governance, internal
control, and risk management arrangements within the council.
• Annual Assurance Statements / Checklists whereby Chief Officers have confirmed
that, to the best of their knowledge, corporate governance arrangements and financial
controls in their services have been, and are, working well and there are, in their
opinion, no significant matters arising which would require to be raised specifically.
• The annual review of the Strategic Governance Framework and update to the
elements and mechanisms in its supporting review programme which demonstrates
the extent of the council’s compliance with the 7 principles, 21 sub-principles, and 91
behaviours and actions contained within the CIPFA Framework 
The Annual Governance Statement for 2024/25 is now presented herewith for the
consideration of the Audit and Scrutiny Panel in line with the Panel’s role “to review the
Annual Governance Statement prior to approval and consider whether it properly reflects
the risk environment and supporting assurances, taking into account Internal Audit’s
opinion on the overall adequacy and effectiveness of the council’s framework of
governance, risk management and control”.
Recommendations
It is recommended that the Audit and Scrutiny Panel:
Item 4
Page 77 of 108

Page 78

1. Background 
1.1 The production of the council’s Annual Governance Statement is underpinned by
statute through the Local Authority Accounts (Scotland) Regulations 2014: 
• Regulation 5(2) requires an authority to conduct a review at least once in each
financial year of the effectiveness of its system of internal control.
• Regulation 5(3) states that the findings from the review at 5(2) “must be considered
at a meeting either of the local authority or of a committee of the local authority
whose remit includes audit or governance functions”. 
• Regulation 5(4) requires that for a local authority in Scotland the statement is an
annual governance statement.
• Regulation 5(5) states that the annual governance statement must be signed by
the Chief Executive and Leader of the Council. 
1.2 Compliance with the legislation also ensures the council demonstrates its commitment
to the good governance principles as set out in the Delivering Good Governance in
Local Government: Framework (2016) and accompanying Guidance Notes for Scottish
Local Authorities (2016) published by Chartered Institute of Public Finance and
Accountancy (CIPFA) in association with the Society of Local Authority Chief
Executives (SOLACE).   
1.3 The essence underpinning the CIPFA Delivering Good Governance in Local
Government: Framework is that local government develops and shapes its own
approach to governance, taking account of the environment within which it operates. 
Within this context, it is therefore up to each local authority to: 
• Set out its commitment to the principles of good governance outlined in the CIPFA
Delivering Good Governance in Local Government: Framework.
• Determine its own governance arrangements, or local code, underpinned by these
principles.
• Ensure that the local code operates effectively in practice. 
1.4 To demonstrate the commitment to, and compliance with, the CIPFA Framework the
council is required to test its governance arrangements (local code) by carrying out the
undernoted.  This further supports the evidence base for the annual review referred to
in paragraph 1.1 and thereby the production of the Annual Governance Statement. 
• Reviewing existing governance arrangements once a year to ensure that the local
code operates effectively in practice.
• Maintaining an up-to-date local code of governance that takes into account the 
(1) Consider and note the Annual Governance Statement for 2024/25, and
(2) Confirm the inclusion of the assurance statement regarding the management of the
risk of fraud and corruption in the Annual Governance Statement for 2024/25, as set
out in paragraphs 2.6 and 2.7.
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Page 78 of 108

Page 79

environment within which it operates and includes arrangements for ensuring
ongoing effectiveness.
• Reporting publicly on compliance on an annual basis, including how the
governance arrangements have been monitored for effectiveness in the year and
identifying planned changes. 
1.5 The council’s own governance arrangements, or local code, is set out in the Strategic
Governance Framework.  The accompanying report on the Audit and Scrutiny Panel
agenda today details the process in place for annual review, assessment, assurance,
and reporting purposes and the role the Strategic Governance Framework has as one
of the 11 sources of assurances that informs the production of the Annual Governance
Statement. 
1.6 In line with the regulations set out in paragraph 1.1 and the good governance
requirements outlined in paragraph 1.4, this report presents the Annual Governance
Statement for 2024/25 to ensure due consideration by the Audit and Scrutiny Panel in
line with the Panel’s remit “to review the Annual Governance Statement prior to
approval and consider whether it properly reflects the risk environment and supporting
assurances, taking into account Internal Audit’s opinion on the overall adequacy and
effectiveness of the council’s framework of governance, risk management and control”. 
1.7 As part of the Annual Accounts for 2024/25, the Annual Governance Statement for
2024/25 is presented herewith also for due consideration by the Audit and Scrutiny
Panel in line with the requirement set out in paragraph 1.1 to ensure that the findings
from the annual governance review are “considered at a meeting either of the local
authority or of a committee of the local authority whose remit includes audit or
governance functions”. Following Audit and Scrutiny Panel consideration and
integration within the Annual Accounts, the Annual Governance Statement will be
signed off by the Chief Executive and Leader of the Council. 
2. Annual Governance Statement 2024/25 
Evidence base 
2.1 The Annual Governance Statement (attached in Appendix 1) has been prepared with
evidence gathered from 11 different sources of assurance to ensure that it properly
reflects the extent and effectiveness of the council’s governance arrangements during
2024/25.  The 11 sources of assurance are listed below. 
Annual Governance Statement sources of assurance
1) Compliance with the CIPFA Position Statement: Audit Committees in Local Authorities
(2018).  
2) Compliance with the CIPFA Statement on the role of the Head of Internal Audit in public
service organisations (2019).  
3) Compliance with the CIPFA Statement on the role of the Chief Financial Officer in Local
Government (2016).  
4) Compliance with the CIPFA Code of Practice on Managing the Risk of Fraud and Corruption
(2014).  
5) Compliance with the Public Sector Internal Audit Standards (PSIAS).
6) Chief Officers year-end good governance assurance certificates and checklists.
7) Arm’s length external organisations (ALEOs) year-end good governance assurance
certificates and checklists.  
8) Annual review and update of the local code of governance review programme (i.e. the
Strategic Governance Framework).  
9) The Annual Audit Report (AAR) process undertaken by the external auditors, together with
the national approach to auditing Best Value through thematic audit work.
10) Findings from other audit, scrutiny, or inspection bodies in relation to service specific
Page 79 of 108

Page 80

assessments.
11) The role of the council’s senior management team structure of meetings in respect of good
governance, assurance, and continuous improvement. 
2.2 While the sources of assurance listed in the table above have traditionally provided the
evidence base for the Annual Governance Statement, a new development
implemented for 2023/24 enhanced how the evidence for each of these sources of
assurance is reported in the Annual Governance Statement. This also enabled
improvement actions and/or future planned developments in relation to the council’s
governance arrangements and systems of internal control to be more clearly identified
and thereafter stated in the Annual Governance Statement. This supported a specific
Internal Audit recommendation following a review of corporate governance in 2023. 
With no adverse feedback received on the approach implemented for the 2023/24
process, this approach has continued for 2024/25. 
2.3 In addition, following research to review the Annual Governance Statements for all
other 31 local authorities in Scotland, the structure of the council’s Annual Governance
Statement for 2023/24 was enhanced with improvements that incorporated the points
made at paragraph 2.2 above, and took on board some practices used in other local
authorities. With no adverse feedback received on the approach implemented for
2023/24, this approach has continued for 2024/25. 
Certification of assurance 
2.4 The evidence obtained through the 11 sources of assurance listed in paragraph 2.1
above - and presented in Appendix 1 - and the results of these processes, are
considered sufficient to support the Chief Executive and the Council Leader signing the
Annual Governance Statement (after due consideration by the Audit and Scrutiny
Panel).  Thus, stating that reasonable assurance can be placed on the adequacy and
effectiveness of the corporate governance systems operating within the council, and
that the council complies with relevant corporate governance principles in all significant
respects. 
2.5 A key piece of evidence in this respect is the annual Internal Audit opinion from the
Chief Officer (Audit and Risk) which aims to provide independent and objective
assurance as to the adequacy and effectiveness of governance, internal control, and
risk management arrangements within the council.  This reports that: 
• “The annual opinion is unqualified and states that reasonable assurance can be
placed on the council’s governance, risk management, and internal control
arrangements” for 2024/25.
• “There is generally an overall sound system of governance, risk management and
internal control in place.  While some issues, non-compliance or scope for
improvement were identified, individually these do not significantly impair the
council’s system of internal control.” 
2.6 The evidence presented also supports the incorporation of a specified Fraud Statement
which - in line with the CIPFA Code of Practice on Managing the Risk of Fraud and
Corruption (2014) - specifically requires to be “approved by the governing body and
signed by the person responsible for signing the annual governance report”. 
• As well as looking for compliance in terms of developing a strategy and identifying
the risks (which is evidenced in the Strategic Governance Framework), the CIPFA
Code of Practice on Managing the Risk of Fraud and Corruption (2014) also
requires responsibility to be acknowledged.  
Page 80 of 108

Page 81

• In this respect the Internal Audit annual report 2024/25 from the Chief Officer (Audit
and Risk) specifies that Internal Audit “has responsibility for investigating alleged
frauds and irregularities brought to our attention in accordance with the council’s
Counter Fraud Policy. Where detailed work is carried out, the findings are reported
to the Chief Executive and the relevant Chief Officer, with details of the work
presented to the [Audit and Scrutiny] Panel in line with the Internal Audit Charter.”
• The Internal Audit annual report 2024/25 from the Chief Officer (Audit and Risk)
has confirmed that “One fraud investigation was undertaken during 2024-25. This
… related to school funds and involved a report of missing monies. During the
investigation, a member of staff confessed to taking funds on several occasions for
personal use, and the audit work concluded that there was clear evidence that
fraud had been committed. Appropriate action was taken under the council’s
Discipline Policy and the member of staff involved resigned prior to the disciplinary
hearing. In line with the council's Corporate Fraud Policy, this matter was referred
to Police Scotland for further consideration, and details of the fraud were also
reported to Audit Scotland.” 
2.7 Having considered the information presented in paragraph 2.6 above to support the
council’s arrangements to manage the risk of fraud and corruption and, in line with the
CIPFA Statement, the Audit and Scrutiny Panel will be asked to approve the following
statement for inclusion in the Annual Governance Statement prior to formal sign off by
the Chief Executive and Leader of the Council:
- “Having considered all the principles, I am satisfied that the organisation has
adopted a response that is appropriate for its fraud and corruption risks and
commits to maintain its vigilance to tackle fraud”.  
Next steps 
2.8 The Annual Governance Statement for 2024/25 will now be included in process for the
Annual Accounts for 2024/25. Once this is concluded the Annual Governance
Statement for 2024/25 will be reported publicly through the website to demonstrate the
council’s compliance with the principles of good governance.  Information will also be
included to demonstrate that the governance arrangements have been monitored for
effectiveness in the year and planned changes have been identified to ensure
continuous improvement. 
3. Measures of success 
3.1 Measures of success include the production of the council’s Annual Governance
Statement in line with the Local Authority Accounts (Scotland) Regulations 2014 and
Delivering Good Governance in Local Government: Framework (2016).   
This includes that the Annual Governance Statement is reviewed by the Business
Management Team and Corporate Management Team (in line with their respective
governance, strategic oversight, assurance, and continuous improvement roles) who
agree its submission to the Audit and Scrutiny Panel, and that it is approved by the
Audit and Scrutiny Panel, incorporated into the Annual Accounts, signed off by the Chief
Executive and Council Leader, and reported publicly on the council’s website. 
4. Supporting documentation 
4.1 Appendix 1 -  Annual Governance Statement 2024/25. 
Page 81 of 108

Page 82

Stephen Penman
Chief Officer (Strategy and Engagement) 
5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
The Delivering Good Governance in Local Government: Framework (2016)
positions the attainment of sustainable economic, societal, and environmental
outcomes as a key focus of governance processes and structures.  As such this is
reflected in the Strategic Governance Framework review programme. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Yes ☐ No ☒
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts been discussed and agreed with
Finance?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Development and publication of the Annual Governance Statement ensures the
council complies with the CIPFA Statement on the Role of the Chief Financial Officer
in Local Government (2016) in terms of financial controls.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☒ No ☐
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Production of the council’s Annual Governance Statement is underpinned by
statute through the Local Authority Accounts (Scotland) Regulations 2014, as noted
in paragraph 1.1.
Page 82 of 108

Page 83

5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or scheduled) by the Enterprise Architecture
Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
The Delivering Good Governance in Local Government: Framework (2016)
positions the attainment of sustainable economic, societal, and environmental
outcomes as a key focus of governance processes and structures.  As such this is
reflected in the Strategic Governance Framework review programme.
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Through publication of the Annual Governance Statement on the website, the
council will ensure it meets the requirements to report publicly on compliance with
the principles of good governance.  
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Development and publication of the Annual Governance Statement - in line with the
Local Authority Accounts (Scotland) Regulations 2014, the principles set out within
the Delivering Good Governance in Local Government: Framework (2016), and in
accordance with the Best Value duty - contributes towards the mitigation of the risk
on the Corporate Risk Register for Governance, Leadership, and Decision Making.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
Page 83 of 108

Page 84

does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 84 of 108

Page 85

Appendix 1 
Annual Governance Statement
2024/25 
1. Purpose. 
1.1 The council is required to produce an Annual Governance Statement in line with the Local
Authority Accounts (Scotland) Regulations 2014:   
• Regulation 5(2) requires an authority to conduct a review at least once in each financial year
of the effectiveness of its system of internal control.
• Regulation 5(3) states that the findings from the review at 5(2) “must be considered at a
meeting either of the local authority or of a committee of the local authority whose remit
includes audit or governance functions”. 
• Regulation 5(4) requires that for a local authority in Scotland the statement is an annual
governance statement.
• Regulation 5(5) states that the annual governance statement must be signed by the Chief
Executive and Leader of the Council. 
1.2 The Annual Governance Statement is required to outline the council’s governance arrangements
for the last financial year and demonstrate how the council complies with the principles of good
governance.  The principles of good governance in the public sector are defined by the
International Framework: Good Governance in the Public Sector which was jointly developed by
the Chartered Institute of Public Finance and Accountancy (CIPFA) and the International
Federation of Accountants (IFAC).  The International Framework offers the definition that:
“Governance comprises the arrangements put in place to ensure that the
intended outcomes for stakeholders are defined and achieved.” 
1.3  The fundamental function of good governance is to ensure that governing bodies (and individuals
working for public sector entities) achieve their intended outcomes while acting in the public
interest at all times.  Acting in the public interest implies primary consideration of the benefits for
society, which should result in positive outcomes for service users and other stakeholders, and
requires: 
A. Behaving with integrity, demonstrating strong commitment to ethical values, and respecting
the rule of law.
B. Ensuring openness and comprehensive stakeholder engagement. 
In addition to the overarching requirements for acting in
the public interest (as noted in principles A. and B.
above), achieving good governance also requires
effective arrangements for: 
C. Defining outcomes in terms of sustainable economic,
social, and environmental benefits.
D. Determining the interventions necessary to optimise
the achievement of the intended outcomes.
E. Developing the entity’s capacity, including the
capability of its leadership and the individuals within
it.
F. Managing risks and performance through robust
internal control and strong public financial
management.
G. Implementing good principles in transparency,
reporting, and audit, to deliver effective accountability. 
1.4 The principles in the International Framework have been interpreted for the local government
environment.  This is set out in the Delivering Good Governance in Local Government: Page 85 of 108

Page 86

Framework (2016) and accompanying Guidance Notes for Scottish Local Authorities (2016) which
was published by CIPFA in association with the Society of Local Authority Chief Executives
(SOLACE):
• The Delivering Good Governance in Local Government: Framework details the 7 principles
within the International Framework along with a set of 21 supporting sub-principles and 91
examples of behaviours and actions which CIPFA consider demonstrate good governance. 
1.5  In practice, governance comprises the combination of structures, strategies, policies, plans,
frameworks, systems, processes, rules, codes, procedures, cultures, and values that are used to
direct, control, and manage a local authority’s operations and activities.  This includes political,
economic, social, environmental, legal, and administrative structures and processes, and other
arrangements, as encapsulated in the principles defined in the Delivering Good Governance in
Local Government: Framework.  These define roles and responsibilities and accountabilities and
establish mechanisms to enable a local authority to pursue its vision effectively and ensure that
the vision is underpinned with control and the management of risk.  The list of items referred to in
this paragraph are hereinafter referred to as elements and mechanisms.  Through these elements
and mechanisms the overall aim is for the council to ensure: 
• Resources are directed in accordance with agreed policy and according to priorities, and in
line with corporate project management procedures.
• There is sound and inclusive decision making.
• There is clear accountability for the use of those resources in achieving defined outcomes for
service users and local communities. 
1.6 The purpose of the Annual Governance Statement is therefore to report publicly on the extent to
which the council’s arrangements are consistent with the principles in the Delivering Good
Governance in Local Government: Framework.  This includes how the effectiveness of the
governance arrangements have been monitored and evaluated over the previous year, and any
planned changes for the year ahead. 
1.7 The Annual Governance Statement in this document therefore comprises the following sections: 
• Section 2:  Scope of responsibility - to ensure that there is a sound system of 
governance in place.
• Section 3:  The local context - which takes into account the economic, societal and 
environmental aspects within which the council operates, and the 
improvements made in this respect to drive forward achievement of the 
organisation’s strategic objectives.
• Section 4:  Annual review - to assess the effectiveness of the council’s governance 
arrangements and system of internal control through evidence gathered from 11 
sources of assurance that incorporate improvements from current and previous 
years issues.
• Section 5:  Certification of assurance - on the level of assurance that the governance 
arrangements provide. 
2.  Scope of responsibility - to ensure that there is a sound system of governance in place. 
2.1 North Lanarkshire Council is committed to ensuring that its business is conducted in accordance
with the law and proper standards, and that public money is safeguarded, properly accounted for,
and used economically, efficiently, and effectively. 
2.2 As such, the council has adopted the principles and requirements of the Delivering Good
Governance in Local Government: Framework (2016) and accompanying Guidance Notes for
Scottish Local Authorities (2016) in order to ensure its governance arrangements remain sound
and the highest standards continue to be met.   
2.3 The council is required, in line with the Delivering Good Governance in Local Government:
Framework, to test its governance arrangements (local code) against these principles by: 
• Maintaining an up-to-date local code of governance that takes into account the environment Page 86 of 108

Page 87

within which it operates and includes arrangements for ensuring ongoing effectiveness.
• Reviewing existing governance arrangements once a year to ensure that the local code
operates effectively in practice.
• Reporting publicly on compliance on an annual basis, including how the governance
arrangements have been monitored for effectiveness in the year and identifying planned
changes. 
2.4 As such, the council has: 
a) Set out its local code of governance in the Strategic Governance Framework.  The Strategic
Governance Framework was initially approved by the Audit and Scrutiny Panel in February
2020 and has been subject to a review and refresh process annually thereafter.  The
Strategic Governance Framework sets out the elements and mechanisms which form the
council’s local code of governance, and which demonstrate North Lanarkshire Council’s
commitment to the principles of good governance. 
b) A well-established assessment process which reviews the council’s governance
arrangements and systems of internal controls on an annual basis.  This assessment - which
provides evidence that informs the Annual Governance Statement - aims to:
• Ensure the council can demonstrate ongoing compliance with the principles in the
Delivering Good Governance in Local Government: Framework and that the governance
arrangements operate effectively in practice.
• Identify any improvement actions and/or future planned developments required in
relation to the council’s key governance arrangements and continuous improvement
activity. 
c) A well-established annual process that enables Chief Officers and Elected Members to
discharge their duties through their specific responsibilities for determining and implementing
the council’s governance arrangements, ensuring the local code (the Strategic Governance
Framework) is reviewed and assessed on an annual basis, identifying any improvement
actions and/or future planned developments required in relation to key governance
arrangements to ensure continuous improvement, and ensuring that the outputs from the
annual assessment are reported publicly (to the Audit and Scrutiny Panel and through the
council’s website). 
2.5 The council also has a duty under the Local Government in Scotland Act 2003 to demonstrate
Best Value by securing continuous improvement in performance. Good governance is central to
meeting Best Value obligations as effective governance and accountability arrangements, with
openness and transparency in decision-making, schemes of delegation, and effective reporting of
performance essential for taking informed decisions and ensuring effective scrutiny of
performance and stewardship of resources. 
2.6 As the council has a controlling interest in a number of companies and a minority interest in joint
ventures, the Code of Practice on Local Authority Accounting requires (where significant) the
summary Group Accounts to be included within the Annual Accounts, showing the financial
position of the council and its subsidiaries plus the investments in associates and interests in joint
ventures as a single economic entity.  As such, the Annual Governance Statement also covers
the organisations consolidated in the council’s Group Accounts. 
3. The local context - which takes into account the economic, societal, and environmental
aspects within which the council operates and the improvements in this respect to drive
forward achievement of the organisation’s strategic objectives. 
3.1  The Plan for North Lanarkshire was established in 2019 with a very clear vision - inclusive growth
and prosperity for all - to bring equal benefits and a fairer distribution of wealth to all North
Lanarkshire’s people and communities.   
• Founded on a place-based ambition, The Plan for North Lanarkshire has at its core an
ambition to transform the physical environment of North Lanarkshire in a way that recognises
the intrinsic value - and economic, social, and health benefits - gained in doing so. Page 87 of 108

Page 88

• This ambition recognises that implementing a place-based approach originates from the
need to address spatial concentrations of disadvantage which, in recent years, have become
further exacerbated by a growing complexity of problems being presented in terms of
economical, health, and social issues.  As such, a place-based approach aims to target an
entire community and tackle issues that exist at the neighbourhood level (such as
employment, education, skills, economic stability, housing, and health), and address
fragmented service provision that leads to gaps or duplication of effort. 
• Investing in a place-based approach and focusing on the physical environment of local
communities, and on better integrated and more accessible service systems therein,
underpins the holistic approach (that crosses public sectors and service silos) being
delivered through the Programme of Work.  This approach aims to make The Plan for North
Lanarkshire real for people, and North Lanarkshire a place which individuals can identify with
- a place to live, learn, work, invest, and visit. 
3.2 Prior to The Plan for North Lanarkshire being formally established in 2019, the shared ambition
for inclusive growth and prosperity was set out in a report approved at committee in September
2018.  This shared ambition was based on evidence through an original dataset which later
evolved into the 28 health check indicators. This report outlined the future direction for North
Lanarkshire to be a place where everyone is given equality of opportunity and where individuals
are supported, encouraged, and cared for at each key stage of their life.  The Plan for North
Lanarkshire is deliberately one plan for one place as partners from the North Lanarkshire
Community Planning Partnership endorsed this approach from the outset and signed up to the
shared ambition therein for the North Lanarkshire area. 
• When The Plan for North Lanarkshire was established, the area’s demographic, social, and
economic profile at the time showed a positive picture in terms of economic growth, inward
investment, employment, and educational attainment, but still unacceptably high levels of
deprivation and child poverty and clear areas of inequity and inequality.  This meant that not
all North Lanarkshire’s people were sharing equally in the improving picture, and there was
an element of social exclusion across some towns and communities.  
• Since The Plan for North Lanarkshire was established, the 28 health check indicators have
continued to provide a robust, consistent, and independent way of collectively providing the
context for North Lanarkshire as a place as well as assessing change over time.  The most
recent results, reviewed by the Policy and Strategy Committee in March 2025, indicate that
50% of the indicators show improvement over the period of The Plan for North Lanarkshire. 
• In 2023, the trends in the 28 health check indicators (which showed that challenges remain)
were key to reframing a new five-year Programme of Work (and its fifth iteration).  This was
considered crucial to ensure a heightened and more strategic focus on not only sustaining
the economic and community aspects, but also on ensuring a more targeted approach to
improving social conditions and outcomes. 
• The health check indicators have continued to play a key role in the council’s approach to
strategic planning and informing delivery of the Programme of Work to 2028 to ensure that
the stubborn scale of deprivation in areas that are hardest to reach is targeted through policy
developments that are focused on tackling unstable trends.  This is a critical aspect to
assessing impact and ensuring the success of the place-based ambition of The Plan for
North Lanarkshire, as both place-based regeneration and person-based policies need to
cross policy sectors and be developed and implemented in tandem - as well as integrated
with wider investment and poverty reduction strategies - if transformational change is to truly
make a difference.  As such, a mid-term review of the five-year Programme of Work is
underway that is informed by the latest results for the 28 health check indicators as well as
supplementary evidence and context.  A broad overview of this review is set out in a report to
the Policy and Strategy Committee in March 2025. 
3.3  As the Programme of Work is the delivery vehicle that is making The Plan for North Lanarkshire
real, it has been instrumental since its implementation in 2019 in stabilising the strategic direction
of the council (including work in partnership) in the face of a fast paced, rapidly changing, and
relentlessly uncertain future local government environment, while allowing for appropriate
flexibility in the operational delivery of many complex inter-connected programmes, projects,
activities, and plans to ensure a dedicated focus on transformational change that improves the
lives of local people.   Page 88 of 108

Page 89

• The five-year Programme of Work to 2028 approved in March 2023 was followed by a
supporting single integrated one council Delivery Plan reported to the Policy and Strategy
Committee in March 2024.  This is underpinned by a governance framework which sets out,
inter alia, roles and responsibilities, alignment across other corporate processes, and the
corresponding monitoring, reporting, risk management, internal controls, and quality
assurance arrangements. 
• Programme of Work achievements to date (reported to the Policy and Strategy Committee in
March each year) highlight developments that are key to creating the economic, social, and
community conditions that will enable local people and communities (and the place that is
North Lanarkshire) to thrive.  These focus on the investment made to establish the solid
foundations required to support the place-based ambition and show how the one place one
plan one council approach and ongoing leadership and commitment to the Programme of
Work are making a difference.  Recent highlights, reported in March 2025, include the
following: 
- Good progress being made in terms of five new community hubs being built at various
sites across North Lanarkshire.
- The 65th new supply development starting on site to deliver more new homes for social
rent and increase the new supply programme to further support the regeneration of local
communities and town centres, create jobs, and boost the local economy.
- The 800th property purchased under the open market purchase scheme to increase the
supply of affordable homes for rent, address housing needs, and support the
regeneration of local communities. 
- Creating 17.2 kms of active travel routes to help establish a network of safe, accessible
walking / wheeling / cycling routes to help people access employment, education, and
leisure opportunities, improve health and well-being, and reduce carbon emissions.
- Developing a new heritage and countryside trail, designed to showcase North
Lanarkshire's rich history through engaging stories and interactive experiences.  Set
across 10 locations, this has been developed to attract tourists and locals to explore the
area as well as promote active lifestyles and health and wellbeing.
- Conducting the first trials of new materials designed to reduce carbon in the roads
industry through a partnership with Transport for West Midlands, Amey, and Colas, as
part of ADEPT Live Labs 2 (a three-year UK-wide programme funded by the Department
for Transport aimed at decarbonising the local road network).  
- Establishing the Invest Here website ( https://www.investinnorthlanarkshire.co.uk/ ) to
capitalise on North Lanarkshire’s position at the heart of Scotland with excellent
transport links to support inward investment and show the range of opportunities
available to support new businesses and key industry sectors to plant roots, grow, and
support the local economy.  This is supported by the new Invest in North Lanarkshire
advisory service to provide bespoke advice to help streamline and accelerate the
statutory consent process for developers. 
- Being the first council in Scotland to achieve the Breastfeeding Friendly Scotland Local
Authority Award at the gold standard.  
- Delivering a range of technological developments to further support connectivity and
digital inclusion across North Lanarkshire, including a chat bot functionality on the
council’s website to enable residents to receive automated responses or chat to an
advisor, extension of public wi-fi, three more immersive experience facilities, expansion
of the inter-generational project that encourages older residents to use technology to
enrich their lives and support social inclusion through one-to-one training with young
people from local schools, smart lighting and Internet of Things pilots deployed to
Palacerigg and Strathclyde Country Parks, and more processes / services becoming
available for public interaction through the council website.
- Various public and stakeholder feedback events on many significant local developments
to allow residents to provide their views and shape the next steps, including in relation to
Cumbernauld Town Centre, the Local Transport Strategy, the Local Development Plan,
East Airdrie Link Road, new digital zones, and the Rediscovering Airdrie project.
- Further developing the use of the three new hubs already built and in operation over the
period of The Plan for North Lanarkshire.  These hubs are now seeing delivery of
integrated and inclusive whole family support accessible at the heart of local Page 89 of 108

Page 90

communities.  Activities being delivered from hubs also includes partnership working in
relation to employment pathways, community learning and development, and health
improvement.
- Growing the council tax income base by adding 4,853 housing properties over the
duration of The Plan for North Lanarkshire, with 346 properties to the non-domestic
rates income base over the same period.
- Achieving a successful Best Value audit for the second year as part of the national
approach. The 2024 audit focussed on workforce innovation and recognised that the
council’s workforce planning approach is integrated with The Plan for North Lanarkshire,
has a focus on developing the workforce of the wider North Lanarkshire area, and is
supported by robust service workforce plans. The audit also noted that the council is
proactive in developing its workforce as well as that of the wider North Lanarkshire area
and works across a range of partnerships to deliver services for communities.
- Delivering many community benefits which have been derived through Programme of
Work activities - such as providing jobs and training through the new supply programme,
creating opportunities for local businesses and supply chains through large scale
regeneration programmes, targeted training and recruitment for pupils with additional
support needs, and summer placement programmes for young people about to leave
school.  Financial benefits have also been gained, such as donations from various
groups to build beds for disabled plot holders and to work with young people living in
deprived areas, with non-financial support received from contractors in relation to
donating training, time, and excess materials for local projects. 
3.4 These achievements are further supported by the council’s commitment made in 2022 - for itself
and the area of North Lanarkshire - in respect of achieving net zero through the Action on Climate
Together Plan.  This aims to further support delivery of the place based ambition and an update in
this respect was reported to the Environment and Climate Change Committee in February 2025. 
This also highlights some of the council’s climate activity and actions which contribute to reducing
North Lanarkshire’s emissions as well as encouraging more sustainable practices within the area,
and provides an update on the implementation of the national adaptation plan. 
3.5 The transformation of North Lanarkshire to date has been able to be realised through decisions
made by the council’s committees that have been unwavering in their support to not just deliver
the Programme of Work, but to ensure it is delivered with a greater focus on scale and purpose
that escalates positive changes in a way that improves the lives of the people and communities of
North Lanarkshire.   
3.6 These decisions have been consistently underpinned by various Policy and Strategy Committee
approvals, for example of the Medium-Term Financial Plan 2025/26 to 2029/30, the Strategic
Capital Investment Programme for 2024/25 to 2028/29 (bolstered by the Community Investment
Fund), and the One Workforce Plan. This supports the one place one plan one council approach
to the transformation of North Lanarkshire for progress that is made at pace and scale in order to
improve the lives of local people through activities that are underpinned by sound financial
management, risk management, and corporate governance controls to ensure the council
remains financially sustainable. 
• Six monthly Programme of Work progress reports have continued to support the role of the
Policy and Strategy Committee in maintaining their strategic oversight role of the overall
Programme of Work to 2028 (in line with the Scheme of Administration).  This role relates to
the “development, co-ordination, and monitoring of The Plan for North Lanarkshire” and to
keeping under review such “programmes as the Committee considers necessary to achieve
the council’s long-term aims and objectives”.   
3.7 Sitting alongside the Programme of Work - as a key aspect of the council’s strategic planning
framework - is the Strategic Policy Framework.  This specifies the hierarchy of strategies,
policies, and plans which underpin delivery of the vision set out in The Plan for North Lanarkshire
and ensures that strategy and policy remain connected to delivery in order to collectively facilitate
a co-ordinated approach to identifying the resources and working practices needed to support
delivery of the long-term vision.  Through a structured approach, the Strategic Policy Framework
aims to ensure that strategies, policies, and plans are formulated, developed, implemented, Page 90 of 108

Page 91

monitored, and reviewed in a consistent and transparent manner across the council.   
• The latest Strategic Policy Framework was approved by the Policy and Strategy Committee
in March 2024. The supporting review programme ensures each of the strategies, policies,
and plans are up to date, reviewed and updated at an appropriate interval, and reported to
the relevant committee.  A guidance document supports the development and monitoring
processes for strategies, policies, and plans, and ensures ongoing openness and
engagement through stakeholder consultation.  
• An improvement implemented during 2024/25 was a lite touch assessment of all strategies,
policies, and plans updated during the year to ascertain compliance with the Strategic Policy
Framework guidance.  The outputs from this assessment were reported in the annual
position statement update to the Audit and Scrutiny Panel in October 2024. This also
supported implementation of the improvement action previously identified by Audit Scotland
in their Best Value thematic work which stated that “the council should look to improve its
existing processes for engaging Elected Members on the overall strategic planning process”. 
3.8 Key to evaluating the success of The Plan for North Lanarkshire and assessing delivery of the
Programme of Work (while ensuring each stage of delivery towards achieving the overall vision is
appropriately aligned, planned, guided, implemented, monitored, and governed) are six inter-
related corporate frameworks that aim to maintain a corporate one council approach across the
organisation: 
• Strategic Policy Framework
• Strategic Governance Framework
• Strategic Performance Framework
• Strategic Self-Evaluation Framework 
• Project Management Framework 
• Framework for Demonstrating Improved Outcomes for Communities  
3.9 To ensure these frameworks remain aligned to The Plan for North Lanarkshire and Programme of
Work, all are on a regular review and refresh programme.  This also helps the council to ensure it
is proactive in responding to social, economic, and environmental trends and changes in
legislation and governance, as well as the broad range of national policy changes and new
developments.  Updates in respect of these frameworks are captured in the Strategic
Governance Framework review programme each year and a summary is provided below.   
Strategic Self-Evaluation Framework
• Aligned to the seven themes in the national Best Value guidance, the council’s Strategic Self-
Evaluation Framework is supported by a rolling review programme.  This Framework
provides a regular mechanism to assess the council’s functions and activities and identify
areas for improvement through a single strategy for improvement that (a) is in line with the
Best Value duty to secure continuous improvement, and (b) ensures self-evaluation is
undertaken within the context of fulfilling the vision set out in The Plan for North Lanarkshire.
• The update to the Strategic Self-Evaluation Framework in October 2022 introduced a
corporate approach to Options Appraisal.  While the use of options appraisal was already
widespread across the council, the approach was formalised to ensure that the outcomes
from such exercises continue to provide assurances that service provision is efficient and
effective and represent value for money, and that decisions made remain consistent with the
strategic direction for the council, as set out in The Plan for North Lanarkshire.
• Minor changes to the latest update to the Strategic Self-Evaluation Framework in February
2024 ensured ongoing alignment with the national approach to auditing Best Value through
thematic audit work, as well as ongoing compliance with Best Value guidance in terms of the
importance of the council continuing to use self-evaluation to identify areas for improvement.
• Since the Strategic Self-Evaluation Framework and rolling review programme was formally
established (and approved by the Audit and Scrutiny Panel), ten self-evaluation exercises
have been undertaken.  A summary of each exercise has been included in previous year’s
Annual Governance Statements and an annual monitoring process is in place to capture the
status of implementing the improvement actions arising from each self-evaluation exercise:
- The ten self-evaluation exercises resulted in areas for improvement being identified and
captured in supporting improvement plans.  In general, these aimed to further Page 91 of 108

Page 92

strengthen existing arrangements, rather than address any significant issue in terms of
effectiveness.  
- Implementation of the improvement actions arising from the 2023 self-evaluation of the
Audit and Scrutiny Panel (reported to the Panel in September 2023), and how effectively
it was discharging its role, were completed during 2024/25.  A follow up self-evaluation is
scheduled to be undertaken during 2025/26. 
- The remaining improvement actions from the Data Governance Board self-evaluation
undertaken in 2021 were integrated within the senior information risk owner annual
performance and assurance process for which the latest update was reported to the
Finance and Resources Committee in February 2025.
- A self-evaluation was undertaken in early 2025 in relation to the council’s compliance
with the CIPFA Financial Management (FM) Code; this followed on from the initial
evaluation undertaken in 2022.  The 2025 self-evaluation concluded that the council’s
financial management practices comply with all aspects of the CIPFA FM Code with an
average overall rating of 99.6% from the assessment team in terms of strongly agreeing
or agreeing the extent of compliance across all the 17 financial management standards. 
This is an improvement from 98% in the initial assessment in 2022. There were no
disagree or strongly disagree assessments assigned by the assessment team in the
2025 survey - this is an improvement from 2% disagreeing in the initial assessment in
2022. This suggests the assessment team considered there were no areas where the
council did not comply across all 17 financial management standards in the 2025 self-
evaluation and was supported by the accompanying qualitative feedback from the
assessment team.  The corresponding discussions in the consensus session focused on
areas where the assessment team considered the council could improve / further
strengthen existing arrangements, rather than a need to address any significant issue in
relation to non-compliance.  As such, an improvement plan is in place focussing on
strengthening existing arrangements around three of the CIPFA FM Code principles. 
Project Management Framework
• A review and refresh of the council’s project management model in 2022 was supported by a
self-evaluation exercise.  This was required to ensure the council’s arrangements remained
fit for purpose and able to effectively support delivery of The Plan for North Lanarkshire, and
followed recommendations arising from Internal Audit reports on managing strategic change
and the governance of capital projects.  The review was also considered necessary in light of
the changes in the council’s operating environment since the implementation of the model in
2018.  These changes had led to a rapid evolution of programmes and projects across the
council, as well as increasing complexities in the delivery of many of these, and a growing
need for good governance and good project management to set up and deliver a wider range
of projects at pace and scale, and ensure these are well-directed, delivered to time, cost, and
quality targets, and provide the expected benefits and improved local outcomes.  
• Following a successful pilot, Project Management training was rolled out across the
organisation from February 2023 and has continued into 2024/25.  This comprises a
programme of half and full day training sessions for which Chief Officers identified the
employees who had to undergo the training.  Feedback from these sessions was very
positive and a refresher programme has been developed and rolled out for 2025/26.
• During 2024, the Project Management Framework was subject to a lite touch review to
ensure it continued to remain fit for purpose.  This refresh took account of key feedback
arising from the aforementioned training programme, reiterated the requirement to undertake
a post project evaluation, incorporated the gateway check process from the Invest in North
Lanarkshire Programme of Work, reiterated the importance of Data Protection Impact
Assessments (DPIAs) being given due consideration at the beginning of a project, and raised
awareness that project management and change management need to complement each
other and work in tandem to support delivery of the Programme of Work to 2028.
• Quality assurance arrangements have been established and aligned to the governance
supporting the Programme of Work to 2028 to ensure the council can (a) demonstrate
compliance with the Project Management Framework, and (b) monitor delivery of projects
and activities supporting the Programme of Work in line with the dimensions within which a
project requires to be delivered, i.e. scope, quality, time, cost, resources, risk, and completed
status.  Quality Assurance results are subject to regular audits by Internal Audit and also to
review and strategic oversight by the Audit and Scrutiny Panel (in February 2024 and Page 92 of 108

Page 93

February 2025). 
Strategic Performance Framework
• The Strategic Performance Framework is supported by a Performance Reporting Schedule
which sets out the performance reporting, monitoring, review, and scrutiny arrangements for
The Plan for North Lanarkshire by way of a reporting schedule and set of non-negotiable
standards.  During 2024/25, information regarding items on the Performance Reporting
Schedule (i.e. Chief Officers six monthly performance reviews at service committees and
service specific reporting to meet business and/or statutory obligations) was made available to
the Audit and Scrutiny Panel through quarterly performance assurance reports in order to
support the Panel’s scrutiny and strategic oversight role.
• Since its implementation the Performance Reporting Schedule has been regularly reviewed
and updated.  An update to the reporting schedule is expected to be submitted to the Audit
and Scrutiny Panel in cycle 3 of 2025; this will include due consideration of the impact of the
newly published Accounts Commission Statutory Direction for 2025/26 to 2027/28.
• During 2024/25 there were 58 performance reports produced in line with the Performance
Reporting Schedule.  A small number of reports did not make the scheduled reporting cycle,
but clear explanations were provided that were found to be logical and sensible, and an
agreement was reached on an appropriate subsequent reporting cycle.  It should be noted that
as the Reporting Schedule is developed only once a year as at a moment in time, it is
expected that national changes or changes in local operating contexts and priorities may have
an impact on subsequent reporting requirements and dates. 
• During 2024/25, Chief Officers’ six-monthly reports in line with the Strategic Performance
Framework followed the standard template.  This ensured that all reports consistently (a) set
out the current context within which the service is operating, (b) highlighted areas of good
performance that could be evidenced in the accompanying data, (c) provided a summary of
areas of performance requiring improvement along with narrative that gives an explanation for
the level of performance achieved and summarises the remedial action implemented (or to be
implemented) to bring performance back on track, and (d) demonstrated that the loop has
been closed in terms of implementation and monitoring of both improvement actions and
subsequent performance levels.  
• Previously, the extent of the action undertaken by each audience when reviewing and
scrutinising the performance information before them has been varied.  The ask of the
audience reading the report is now specifically (and appropriately) referenced in performance
reports to service committees.  This practice was already in place for Audit and Scrutiny Panel
reports for the scrutiny function of the Panel.  Specific training was held in 2024 in relation to
the scrutiny of performance; this aimed to further complement awareness raising and roles
and responsibilities (as identified through the aforementioned Audit and Scrutiny Panel’s self-
evaluation exercise in 2023). 
• Reporting of the Local Government Benchmarking Framework (LGBF) measures are
integrated into the Strategic Performance Framework alongside the wider suite of measures
within each Chief Officers’ area of responsibility. This approach ensures that reports contain a
suite of all relevant performance indicators in order to provide a complete picture of
performance.  The council’s website hosts a new dashboard for LGBF measures which was
launched by the Improvement Service in 2023.  This provides an easy way to view a live
picture of the most up to date performance for a benchmarking measure as at a point in time. 
It also enables North Lanarkshire’s performance to be compared with other local authorities
and the national average.  The use of this dashboard is signposted in performance reports to
service committees.    
4. Annual review - to assess the effectiveness of the council’s governance arrangements and
system of internal control through evidence gathered from 11 sources of assurance that
incorporate improvements from current and previous years issues. 
Sources of assurance 
4.1 As noted in paragraph 2.3 above, the annual review process is an important aspect of the work
undertaken each year to assess the effectiveness of the council’s governance arrangements and
systems of internal control and establish the evidence base to inform the Annual Governance
Statement.  As such, various elements and mechanisms, and roles and responsibilities, are key Page 93 of 108

Page 94

to this process.  These sources of assurance are listed below: 
1) Compliance with the CIPFA Position Statement: Audit Committees in Local Authorities
(2018).  
2) Compliance with the CIPFA Statement on the role of the Head of Internal Audit in public
service organisations (2019).  
3) Compliance with the CIPFA Statement on the role of the Chief Financial Officer in Local
Government (2016).  
4) Compliance with the CIPFA Code of Practice on Managing the Risk of Fraud and Corruption
(2014).  
5) Compliance with the Public Sector Internal Audit Standards (PSIAS).
6) Chief Officers year-end good governance assurance certificates and checklists.
7) Arm’s length external organisations (ALEOs) year-end good governance assurance
certificates and checklists.  
8) Annual review and update of the local code of governance review programme (i.e. the
Strategic Governance Framework).  
9) The Annual Audit Report (AAR) process undertaken by the external auditors, together with
the national approach to auditing Best Value through thematic audit work.
10) Findings from other audit, scrutiny, or inspection bodies in relation to service specific
assessments.
11) The role of the council’s senior management team structure of meetings in respect of good
governance, assurance, and continuous improvement. 
Assessment of assurance 
4.2 Each of the assurance sources listed in paragraph 4.1 has undergone a review and assessment
process to ensure the information reported in the Annual Governance Statement reflects the most
up to date position and provides the relevant assurances in respect of the council’s governance
arrangements and system of internal control.  A summary of these assurance assessments is
noted in paragraph 4.3 below at points (1) to (11). 
4.3 While individually each of these 11 sources of assurance are supported by separate processes
and arrangements, collectively they provide an evidence base that is aligned in support of the one
council approach that underpins implementation of The Plan for North Lanarkshire.  As such,
where improvements have been made during the year, or found to be required moving forward,
these are highlighted within each item. 
1) Compliance with the CIPFA Position Statement: Audit Committees in Local Authorities
(2018).  In this respect the activities and functions of the council’s Audit and Scrutiny Panel are
required to reflect the standards set out in the CIPFA Statement.   
The Strategic Governance Framework sets out the evidence in this respect and confirms that
during 2024/25 the purpose of the Audit and Scrutiny Panel, as set out in the Scheme of
Administration (December 2024), reflects the standards set out in the CIPFA Statement in that its
role is to “provide independent assurance to the council and those charged with governance on the
adequacy of the council's risk management framework and internal control environment”.   
The Scheme of Administration confirms that the Audit and Scrutiny Panel is responsible for
“providing an independent review of the council's governance, risk management, performance, and
control frameworks, and overseeing the financial reporting and annual governance processes. It
oversees the council's internal and external audit arrangements, helping to ensure efficient and
effective assurance arrangements are in place.  It also undertakes the scrutiny function within the
council’s governance framework and undertakes in-depth examination of particular areas of policy
and/or service delivery with a view to making recommendations for improvement.” 
The Scheme of Administration also sets out the Audit and Scrutiny Panel’s specific duties in
relation to the Annual Governance Statement which is to “review the Annual Governance
Statement prior to approval and consider whether it properly reflects the risk environment and
supporting assurances, taking into account Internal Audit’s opinion on the overall adequacy and
effectiveness of the council’s framework of governance, risk management and control.” Page 94 of 108

Page 95

During 2024/25, the Audit and Scrutiny Panel held its meetings as scheduled once every cycle,
with a special meeting held at the end of June 2024 and the end of October 2024 to support the
council in discharging its duties in respect of the year-end Annual Accounts.  A summary of agenda
items considered by the Audit and Scrutiny Panel during the year is contained in the extract below. 
Summary of Audit and Scrutiny Panel agenda items during 2024/25 
• Internal Audit - four progress reports covering 17 audit assignments undertaken from the
audit plan which resulted in 38 recommendations, four follow up reports of actions
previously agreed by management in response to audit recommendations, two follow up in-
depth reports from Chief Officers in relation to audits (on school fund compliance and
duplicate payments), two reports on the National Fraud Initiative, the Internal Audit
Strategy, Internal Audit Charter, Internal Audit annual plan, and Internal Audit annual report
and audit opinion.
• Risk management - four risk management updates in respect of the Corporate Risk
Register, with one report providing the updated Corporate Risk Register for 2024/25.  Two
of these reports provided an updated summary of key risks from service risk registers to
enable Elected Members to have sight of those risks with the highest residual risk scores. 
• Financial management - one report in relation to the unaudited Annual Accounts for
2023/24 and one in relation to the audited Annual Accounts for 2023/24.
• External audit - with reports in relation to the Audit Scotland annual audit plan, the
council’s Annual Audit Report (AAR) and accompanying year-end statements, and an
outcome report from the Best Value thematic audit.
• Scrutiny - five reports arising from Panel member led scrutiny (in relation to the
Community Boards, digital broadband, corporate insurance, the Scottish Housing Quality
Standard (SHQS) / Energy Efficiency Standards for Social Housing (EESSH), and school
IT assets age and maintenance), four quarterly performance assurance review reports
providing a composite summary of all performance reports considered by the council
committees in the previous cycle, an annual update in relation to the scrutiny work
programme, an update on the new national approach to auditing Best Value, three reports
providing an update in relation to aspects of the frameworks supporting The Plan for North
Lanarkshire and Programme of Work (i.e. the Strategic Governance Framework, Quality
Assurance annual review, and the corresponding Annual Position Statement for the
frameworks), and the Annual Governance Statement for 2023/24. 
A self-evaluation of the Audit and Scrutiny Panel was undertaken in 2023 and the resultant
outcome report and improvement plan was approved by the Panel in November 2023.  This
followed an Internal Audit review in 2021 which recommended that the Audit and Scrutiny Panel
should, in line with good practice, periodically undertake a self-evaluation of how effectively it is
discharging its role.   
The improvement plan set out two areas for improvement which have been implemented during
2024/25.  The improvement plan also noted that the Audit and Scrutiny Panel agreed to continue to
evaluate the effectiveness of the Panel in discharging its duties - in line with the principles set out
in CIPFAs Position Statement: Audit Committees in Local Authorities (2018), the supporting Audit
Committees Practical Guidance for Local Authorities (2018) document, and the Best Value
Guidance (2020).  As such, a follow up self-evaluation is scheduled to be undertaken during
2025/26. 
In December 2023, the Council meeting formally agreed one of the improvement actions (arising
from the self-evaluation) in respect of amending the governance arrangements and removing the
scope for substitute members to attend Audit and Scrutiny Panel meetings given the importance of
Panel members having appropriate training, knowledge, and understanding and recognising the
role that consistency of involvement has in terms of ensuring ongoing Panel effectiveness.  This
improvement action aims to ensure that Members attending Panel meetings have appropriate
training, knowledge, and understanding of the work of the Panel and that this is enhanced over
time through ongoing and consistent involvement in the Panel’s business. 
Page 95 of 108

Page 96

2) Compliance with the CIPFA Statement on the role of the Head of Internal Audit in public
service organisations (2019). 
To enable the Chief Officer (Audit and Risk) to fulfil the role in this respect, the council’s senior
management team is required to ensure they “set out how the framework of assurance supports
the Annual Governance Statement and identify internal audit’s role within it”.  This assurance is
provided through the Strategic Governance Framework which sets out the role of Internal Audit and
depicts in a diagram the steps in the annual review process which informs the content of the
Annual Governance Statement.  The Strategic Governance Framework undergoes a review and
refresh exercise each year to ensure it remains up to date in reflecting the council’s governance
arrangements and it is reviewed and endorsed annually by the council’s senior management team. 
In line with the CIPFA statement, the Chief Officer (Audit and Risk) has also provided an annual
opinion for 2024/25 on the “overall adequacy and effectiveness of the organisation’s framework of
governance, risk management, and control” through the Internal Audit annual report. In line with the
Public Sector Internal Audit Standards (PSIAS), and the council’s Internal Audit Charter, the
council’s senior management team (through both the Business Management Team and Corporate
Management Team) considered and noted the Internal Audit annual report and opinion for 2024/25
from the Chief Officer (Audit and Risk) on 5th June 2025 and 13th June 2025 respectively.  This
presented an independent and objective assurance as to the adequacy and effectiveness of
governance, internal control, and risk management arrangements within the council and stated: 
• “The annual opinion is unqualified and states that reasonable assurance can be placed on
the council’s governance, risk management, and internal control arrangements” for 2024/25.
• “There is generally an overall sound system of governance, risk management and internal
control in place.  While some issues, non-compliance or scope for improvement were
identified, individually these do not significantly impair the council’s system of internal
control.” 
The CIPFA Statement considers the annual opinion from Internal Audit to be the most important
output and one of the main sources of objective assurance that the Chief Executive and the
council’s senior management team has to support the Annual Governance Statement.  The annual
Internal Audit opinion is set out in more detail in paragraph 4.3 (5) below. 
During 2023/24, an External Quality Assurance Review (EQAR) of the council’s Internal Audit
function assessed compliance with the Public Sector Internal Audit Standards (PSIAS).  An
important element of the PSIAS is a requirement for an independent EQAR to be conducted at
least once every five years and reported to key stakeholders including senior management and an
audit committee; the results of the latest EQAR were reported to the Audit and Scrutiny Panel in
May 2024.  This includes an action plan with findings, responses, and planned actions that have
been agreed by Internal Audit management for implementation during 2024/25 - the annual Internal
Audit report for 2024/25 provides an update on progress in this respect. 
3) Compliance with the CIPFA Statement on the role of the Chief Financial Officer in Local
Government (2016).  It is specified in this CIPFA Statement that the Annual Governance
Statement is required to “address the authority’s arrangements for financial and internal control and
for managing risk”.   
This is addressed through the external auditors’ annual audit of the financial statements which is
undertaken as part of the audit of the Annual Accounts. 
The extent of the council’s compliance in this respect (and the role of the Chief Financial Officer
therein) is further demonstrated through the self-evaluation exercise undertaken in early 2025
(noted in paragraph 3.9) which concluded that the council’s financial management practices
comply with all aspects of the CIPFA Financial Management Code.  The self-evaluation also
confirmed that the council’s Chief Financial Officer operates in a way that is consistent with the
CIPFA Statement.   
In addition, the external auditors Annual Audit Report (AAR) in October 2024 has continued to
report positively on the council’s approach to financial management and financial sustainability. Page 96 of 108

Page 97

4) Compliance with the CIPFA Code of Practice on Managing the Risk of Fraud and Corruption
(2014).  This statement looks for compliance in terms of developing a strategy and identifying the
risks.   
The Strategic Governance Framework sets out the evidence in this respect and shows that the
council has a number of policies and procedures in place which are kept under review and
regularly updated as required.  The key policies and procedures are listed below: 
• Counter Fraud Policy - following a review of the council’s anti-fraud arrangements, an updated
Counter Fraud Policy was approved by the Policy and Strategy Committee in September
2023.  This sets out the council’s expectations (that extend to all individuals and organisations
with whom it deals) in terms of acting honestly and with integrity and in safeguarding public
resources.   
• Whistleblowing Procedure - an annual review process is in place in respect of the use of the
procedure and to identify any amendments required to the procedure.  An updated
Whistleblowing Procedure was approved by the Policy and Strategy Committee in March
2024, and the outcome of the latest annual review is scheduled to be reported to committee
later in 2025. 
• Gifts and Hospitality and Conflicts of Interest procedures for employees - guidance in this
respect was first incorporated into the Employee Code of Conduct in 2018 and updates to this
document have continued to reiterate employee responsibilities in this respect; this includes
the most recent update to the Employee Code of Conduct in February 2025. The year-end
review process is well established whereby Chief Officers are required to submit their up to
date Service Registers annually (as part of the Chief Officer’s Assurance Certificate and
Checklist process) for independent review and reporting to the council’s senior management
team.  The 2024/25 review of Registers found no significant trends or issues of concern that
required to be reported to the senior management team. 
• Code of Conduct for Chief Officers - the latest update in this respect was approved by the
Policy and Strategy Committee in June 2024.  The Code of Conduct for Chief Officers
provides a framework within which Chief Officers of the council are expected to undertake their
duties in a manner which meets the required standards for good governance. 
• Councillors Code of Conduct - this is approved by the Scottish Parliament and issued by
Scottish Ministers.  The Standards Commission for Scotland is responsible for the
enforcement of the code of conduct. It also has responsibility for issuing guidance to assist
local authorities and councillors about the code of conduct and also for hearing complaints
about a councillor.  The latest code and relevant guidance was published in December 2021
and was shared with new and returning Elected Members following the local government
elections in May 2022 with training provided on the content; this Code of Conduct is available
from the council’s website.
• Information Security Policy - the latest update in this respect was approved by the Policy and
Strategy Committee in June 2023.  A review was undertaken on this policy in March 2025 and
the updated policy now incorporates both information security and cyber security to reflect the
importance of cyber security in the council’s daily operations and strategic approach to service
delivery as defined in both the Digital and IT Strategy and The Plan for North Lanarkshire. As
the council takes a digital by default approach to service delivery and much information is now
in a digital format, this incorporates cyber threats that must be mitigated and managed to
protect the council’s information and IT assets.  An updated Information and Cyber Security
Policy was considered by the Data Governance Board in March 2025, with the updated policy
scheduled to be submitted to committee in cycle 3 of 2025. 
• Cyber security - a joint review and assessment was undertaken in 2022/23 (between Internal
Audit and Business and Digital) using a structured format (with templates and guidance
created by the National Audit Office, National Cyber Security Centre (NCSC), and the Scottish
Government).  This assessment - categorised as reasonable assurance - determined the
council has robust and effective information governance arrangements, duly recognises the
risks associated with cyber security threats, and operates arrangements commensurate with
the good practice recommended by bodies such as the National Audit Office.  The outcome
from this review was reported to the Audit and Scrutiny Panel in February 2023.
• Risk Management - the identification of risks is carried out in line with the council’s Risk
Management Strategy (which was updated in March 2023) and through the risk for serious Page 97 of 108

Page 98

organised crime, fraud, and corruption which sits within the Corporate Risk Register.  The
Chief Officer (Legal and Democratic) - the council’s Monitoring Officer - is the identified lead
for this specific risk. 
In addition, the council actively seeks to detect fraudulent activity through participating in the
National Fraud Initiative (NFI).  This is a comprehensive data matching exercise between public
bodies to highlight potential frauds and errors. Internal Audit plan and co-ordinate the submission of
data and investigation of matches identified.  The latest reports in respect of the progress made in
the follow up of matches were reported to the Audit and Scrutiny Panel in May 2024 and October
2024. 
The CIPFA statement also requires responsibility to be acknowledged.  In this respect the Internal
Audit annual report 2024/25 from the Chief Officer (Audit and Risk) specifies that Internal Audit
“has responsibility for investigating alleged frauds and irregularities brought to our attention in
accordance with the Council’s Counter Fraud Policy. Where detailed work is carried out, the
findings are reported to the Chief Executive and the relevant Chief Officer, with details of the work
presented to the [Audit and Scrutiny] Panel in line with the Internal Audit Charter.” 
The Internal Audit annual report 2024/25 from the Chief Officer (Audit and Risk) has confirmed that
“One fraud investigation was undertaken during 2024-25. This … related to school funds and
involved a report of missing monies. During the investigation, a member of staff confessed to
taking funds on several occasions for personal use, and the audit work concluded that there was
clear evidence that fraud had been committed. Appropriate action was taken under the Council’s
Discipline Policy and the member of staff involved resigned prior to the disciplinary hearing. In line
with the Council's Corporate Fraud Policy, this matter was referred to Police Scotland for further
consideration, and details of the fraud were also reported to Audit Scotland.” 
As reported in the Internal Audit annual report 2024/25 from the Chief Officer (Audit and Risk),
reviews of the council’s (a) anti-fraud arrangements and (b) information governance arrangements
were scheduled for 2024/25 but were deferred to 2025/26 due to resources. 
5) Compliance with the Public Sector Internal Audit Standards (PSIAS).  
As reported in the Internal Audit annual report for 2024/25, since their introduction in 2013, the
Public Sector Internal Audit Standards (PSIAS) have been mandatory for Internal Audit functions. 
To ensure compliance with the PSIAS, the Chief Officer (Audit and Risk) is required to develop and
maintain a Quality Assurance and Improvement Programme (QAIP) which includes periodic
internal assessments, and an independent External Quality Assessment (EQA) to be undertaken at
least every five years. 
During 2024/25, internal monitoring and assessment confirmed that Internal Audit continued to
operate in accordance with the PSIAS.  The most recent independent EQA was undertaken by
Stirling Council in 2024 and confirmed that Internal Audit fully conformed with the PSIAS.  This was
reported to the Audit and Scrutiny Panel in May 2024.  Both the self-assessment and EQA
highlighted some areas for improvement and consideration, and these are highlighted in the QAIP
action plan in the 2024/25 Internal Audit annual report. 
From April 2025, the PSIAS was replaced by the Global Internal Audit Standards (GIAS).  The
introduction of the GIAS will require a revision to the current internal audit methodology and
working practices, and a gap analysis exercise is currently being undertaken to determine the
actions to be taken to ensure compliance.  Similar to the PSIAS, compliance with the GIAS will also
be subject to ongoing internal review and periodic self-assessment.  The GIAS also require an
EQA on a five-yearly basis, with the next assessment due to be undertaken in 2028/29. 
As reported in the Internal Audit annual report for 2024/25, Internal Audit is an independent,
objective assurance and advisory function designed to add value and improve the council’s
operations.  It helps the council accomplish its objectives by bringing a systematic, disciplined
approach to evaluating and improving the effectiveness of the council’s risk management, internal
control, and governance processes.   
• The purpose, mandate, authority and responsibilities of the council’s Internal Audit function are Page 98 of 108

Page 99

outlined in the Internal Audit Charter, the most recent version of which was approved by the
Audit and Scrutiny Panel in May 2025.  Internal Audit reports its outputs regularly throughout
the year to the Panel in accordance with the Internal Audit Charter.  The Panel also approves
Internal Audit’s annual audit plan and monitors the performance of the function.
• Internal Audit aims to provide a high quality and customer focused service which is responsive
and flexible, consistent with best professional practice, focuses on areas that matter, uses
resources efficiently and effectively, and is seen by stakeholders as adding value and making a
vibrant and relevant contribution to the council.
• Internal Audit’s primary objectives are:
- To examine and evaluate internal control systems and governance arrangements within
the council.
- To provide assurance to Elected Members and senior officers on the adequacy and
robustness of these systems.
- To assist the Audit and Scrutiny Panel, Elected Members, and officers of the council in the
effective discharge of their responsibilities.
• It should be noted that the presence of an effective Internal Audit function contributes towards,
but is not a substitute for, effective control.  It is primarily the responsibility of management to
establish internal controls so that the council’s activities are conducted in an efficient and well-
ordered manner, to ensure that management policies and directives are adhered to, and that
assets and records are safeguarded.
• The council’s internal audit arrangements are consistent with the CIPFA Statement on the role
of the Head of Internal Audit in public service organisations (2019).   
Internal Audit activity is planned to enable the Chief Officer (Audit and Risk) to provide an
independent annual opinion on the adequacy and effectiveness of internal controls within the
authority, including the systems designed to achieve the corporate objectives of the council and
those that manage the material risks faced by the authority.
• In the Internal Audit annual report for 2024/25, the Chief Officer (Audit and Risk) provides an
overview of the activities of the Internal Audit section for the year 2024/25.  This includes
highlights of issues arising from Internal Audit activity during the year and an extract in this
respect is set out in the table below. 
Extract from the Internal Audit annual report for 2024/25, June 2025 
In the Internal Audit annual report for 2024/25, presented to the Chief Executive and both the
Business Management Team and Corporate Management Team in June 2025, the Chief Officer
(Audit and Risk) provides an overview of Internal Audit activity against the 2024/25 Annual Plan
and includes details of when each assignment was reported to the Audit and Scrutiny Panel
(where not yet formally reported, status and expected dates are given). Key issues arising from
Internal Audit outputs are highlighted in the Internal Audit Progress report presented to each
meeting of the Panel. 
In the Internal Audit annual report for 2024/25, the Chief Officer (Audit and Risk) also highlights
issues arising from Internal Audit activity during the year; an extract from this report is noted
below. 
Audit issues 2024/25
The nature of audit assignments is such that most Internal Audit reports identify some
weaknesses or areas where scope for improvement exists, and during 2024/25, a number of
recommendations were made to address such areas identified from the audit work undertaken.   
The vast majority of audits undertaken during the year received opinions of either Reasonable or
Substantial Assurance, and there are no issues arising from these audits which require to be
highlighted.  However, there are issues (listed below) that while they could be significant to the
control environment in the individual system or areas audited, they are considered not material
enough to have a significant impact on the Chief Officer (Audit and Risk) overall opinion on the
adequacy of the council’s control environment. 
• The 2023/24 annual report discussed reports on the Housing and Corporate Property
Page 99 of 108

Page 100

Maintenance Contract and the whistleblowing allegations received by Audit Scotland, which
resulted in a number of high priority recommendations for management to address.  Audit
work during 2024/25 concluded that significant progress had been made in implementing the
recommendations in both reports, with some aspects being fully implemented.  Internal Audit
will continue to monitor progress with the remaining recommendations, and further
substantive audit work on the operation of the new contract arrangements is planned for
2025/26.
• One audit during 2024/25 provided Limited Assurance, and this was in relation to
arrangements for managing school funds. The control environment around school funds has
been subject to repeated audit activity regarding anomalies and discrepancies, and this audit
highlighted that previously agreed control measures had not been fully implemented. 
Following this audit, an unplanned review was undertaken to review a potential school fund
discrepancy.  Although on this occasion, no financial loss or misappropriation was
discovered, the audit highlighted a number of weaknesses in the recording, reconciling, and
banking of school fund income and expenditure. 
• In response to this work, Education senior management presented a report to the Audit and
Scrutiny Panel in February 2025, detailing actions taken to address the weaknesses
identified and additional measures to further enhance the control environment.  Progress
with these actions will be monitored by Internal Audit.
• One fraud investigation was undertaken during 2024/25. This also related to school funds
and involved a report of missing monies.  During the investigation, a member of staff
confessed to taking funds on several occasions for personal use, and the audit work
concluded that there was clear evidence that fraud had been committed.   Appropriate action
was taken under the council’s Discipline Policy and the member of staff involved resigned
prior to the disciplinary hearing.  In line with the council's Corporate Fraud Policy, this matter
was referred to Police Scotland for further consideration, and details of the fraud were also
reported to Audit Scotland.   
Traditionally, the Annual Governance Statement outlined issues identified during the Internal Audit
programme of work for the previous year and included an update providing details of the actions
taken to address each issue.  In the annual opinion provided by the Chief Officer (Audit and Risk)
for 2023/24, there were no issues that required the Chief Officer to qualify their opinion.  A small
number of areas were highlighted which were noted would continue to be the focus of future audit
coverage during 2023/24.  As such, the extract above from the Internal Audit annual report for
2024/25 sets out the latest position in this respect. 
6) Chief Officers year-end good governance assurance certificates and checklists.  This
requires Chief Officers to review various aspects within their service areas and advise of any
specific issues which require to be identified in the Annual Governance Statement.   
Through this process Chief Officers have reviewed the effectiveness of governance arrangements
during the year within their area of responsibility by completing a Certificate of Assurance and
updating a Checklist to support the preparation of the council’s statements on corporate
governance and internal financial control for the year ending 31 March 2025. 
Following a review of the 14 certificates and checklists completed for 2024/25, Chief Officers have
confirmed corporate governance arrangements and financial controls in their area of responsibility
have been, and are, working well and there are (in their opinion) no significant matters arising
which would require to be raised specifically in the Annual Governance Statement. 
7) Arm’s length external organisations (ALEOs) year-end good governance assurance
certificates and checklists.  This requires the Chief Executive or Senior Representative of each
ALEO to review various aspects within their service areas and advise of any specific issues which
require to be identified in the Annual Governance Statement. 
Through this process the council’s three arm’s length external organisations (ALEOs) have also
reviewed the effectiveness of governance arrangements during the year within their organisation
by completing a Certificate of Assurance and updating a Checklist to support the preparation of the
council’s statements on corporate governance and internal financial control for the year ending 31 Page 100 of 108

Page 101

March 2025. 
In this respect, the Chief Executive or Senior Representative for each ALEO has confirmed
corporate governance arrangements and financial controls in their organisation have been, and
are, working well and there are (in their opinion) no significant matters arising which would require
to be raised specifically in the council’s Annual Governance Statement.   
In setting its budget on 15th February 2024, the Council requested that the remaining ALEOs
(Fusion Assets Limited, Routes to Work Limited, and North Lanarkshire Properties LLP) be formally
reviewed, with their contributions to the council’s strategic priorities and The Plan for North
Lanarkshire, both now and in the future, assessed. This review was undertaken during 2024/25
with the outcome and next steps reported to the Policy and Strategy Committee in March 2025.   
8) Annual review and update of the local code of governance review programme (i.e. the
Strategic Governance Framework).   
The council’s local code of governance brings the principles of good governance together with
legislative requirements and management processes by which the council is directed and
controlled and through which it is accountable to, engages with, and leads the local community. 
Taking into account the local environment within which the council operates, this aims to ensure the
council is able to effectively pursue the long-term ambition set out in The Plan for North
Lanarkshire, while ensuring this is underpinned with control and the management of risk, and: 
• Resources are directed in accordance with agreed policies and according to priorities and in
line with corporate project management procedures.
• There is sound and inclusive decision making.
• There is clear accountability for the use of those resources in achieving defined outcomes for
service users and local communities. 
The council’s local code of governance is set out in the Strategic Governance Framework which is
one of inter-related strategic frameworks that aim to maintain a corporate one place one plan one
council approach.  These frameworks are key to evaluating the success of The Plan for North
Lanarkshire and assessing delivery of the Programme of Work, while ensuring each stage of
delivery towards achieving the overall vision is appropriately aligned, planned, guided,
implemented, monitored, and governed. 
As such, the Strategic Governance Framework: 
• Gathers together all existing governance arrangements into a list of elements and
mechanisms that demonstrates the council’s compliance with the 7 principles, 21 sub-
principles, and 91 behaviours and actions contained within the CIPFA Framework.  By 
collating all existing elements and mechanisms (produced by the respective Chief Officer) into
the one local code for annual review, assessment, assurance, and reporting purposes, the
Strategic Governance Framework and its Review Programme provides an efficient mechanism
through which the annual review can be undertaken.  This also ensures appropriate oversight
and governance of The Plan for North Lanarkshire and supporting Programme of Work and
enables the council to monitor the delivery of its ambitions while ensuring arrangements for
corporate governance, risk management, and internal financial controls are sound.  A
summary of the current position regarding the elements and mechanisms in the Strategic
Governance Framework review programme is set out in the table below.
• Sets out the role of the Chief Officers and the council’s senior management team and its
structure of meetings, Elected Members, and the Audit and Scrutiny Panel who are
responsible for determining and implementing the council’s governance arrangements,
ensuring the local code is assessed on an annual basis to ensure ongoing effectiveness and
compliance, and identifying any improvement actions and/or future planned developments
required in relation to the council’s key governance arrangements and continuous
improvement activity.
• Comprises a diagram that depicts the steps in the annual review process which ensures that
the council’s governance arrangements are regularly assessed for ongoing effectiveness
within the context of The Plan for North Lanarkshire and provides evidence to inform the Page 101 of 108

Page 102

content of the Annual Governance Statement.
• Remains under review through the annual review process whereby each of the elements and
mechanisms in the review programme are examined and updated as required to reflect the
relevant documentation and hyperlinks, as well as the review timeframe and date of next
update.  
• Is supported by an annual assessment of the current position of the elements and
mechanisms in the review programme to ensure they remain timely and effective in supporting
delivery of The Plan for North Lanarkshire.  This involves assigning a corresponding RAG
status to provide a method by which to identify and prioritise items requiring to be reviewed
and updated further.  The latest position following the 2024/25 year-end review identified no
Red elements or mechanisms, one Amber, and the rest were Green.  For the one assessed as
Amber (i.e. employee engagement and wellbeing), there is a commitment by the respective
Chief Officer to ensure an update is undertaken during 2025/26.   
Summary of the latest position regarding the elements and mechanisms
in the Strategic Governance Framework review programme 
• The council’s long-term strategic ambition and priorities in The Plan for North
Lanarkshire and ensuring the vision therein - for inclusive growth and prosperity for all
(to bring equal benefits and a fairer distribution of wealth to all North Lanarkshire’s
people and communities) - is embedded throughout policy statements agreed by the
council, as well as strategic and financial decision making, strategy and policy
development, everyday service delivery activities, and corporate governance
approaches across the organisation.
• Six inter-related strategic frameworks (Policy, Governance, Performance, Self-
Evaluation, Project Management, and Demonstrating Improved Outcomes for
Communities) ensure a one council corporate approach to evaluating the success of
The Plan for North Lanarkshire and assessing delivery of the Programme of Work (while
ensuring each stage of delivery towards achieving the overall ambitions is appropriately
aligned, planned, guided, implemented, monitored, and governed).  To ensure these
frameworks remain fit for purpose, and aligned to The Plan for North Lanarkshire and
Programme of Work, all are on a regular review and refresh programme.
• A strategic planning process is in place through the Programme of Work which is framed
within the context of the local demographic, social, and economic profile that shaped
The Plan for North Lanarkshire.  While stabilising the strategic direction of the council,
the Programme of Work allows for appropriate flexibility in the operational delivery of
many complex inter-connected programmes, projects, and plans to ensure a dedicated
focus on transformational change, and delivering services that improve the lives of local
people.  A supporting governance framework and annual review process enables a
recurring, dynamic, and cohesive approach to the ongoing development of the
Programme of Work and ensures it remains current, relevant, and deliverable.
• A Strategic Policy Framework sits beside the Programme of Work in the strategic
planning process to ensure that strategy and policy remain connected to delivery in
order to collectively facilitate a co-ordinated approach to identifying the resources and
working practices needed to support delivery of the long-term vision.
• Standing Orders allow the council to delegate decision making to committees, sub-
committees, or officers and which set out the rules that apply to the running and
operation of council and committee meetings.
• A Scheme of Administration sets out functions, terms of reference, and powers of the
council and its committees and sub-committees which is aligned to the organisational
structure to facilitate decision making in line with the council’s strategy.
• A Scheme of Delegation to Officers sets out the functions delegated to the Chief
Officers of the council, including making reference to any Officer listed as being
provided with a delegation is, de facto, deemed to hold a politically restricted post (in
accordance with legislation).
• Financial Regulations and a Scheme of Financial Delegation in place, as an integral
part of the council’s framework of internal financial controls, are designed to ensure
effective stewardship of council funds. Compliance with these regulations ensures that
public money is safeguarded and properly accounted for, and all financial transactions
Page 102 of 108

Page 103

are undertaken in a manner which demonstrates openness, transparency, and integrity. 
The Financial Regulations form a key part of the overarching Financial Strategy and the
corporate governance arrangements of the council.
• The well-established Financial Strategy provides the overarching framework that
establishes the financial strategies and policies to ensure effective financial governance,
planning, and management and, as such, sets out the responsibility for safeguarding
public funds within the council.  It also sets out the role and responsibilities of the Chief
Financial Officer, in line with the corresponding CIPFA Statement (2016).  The strategies
and policies covered by the Financial Strategy include the Capital Strategy, Treasury
Management Strategy, Revenue Budget Strategy, the Medium-Term Financial Plan, and
the Financial Regulations and Scheme of Financial Delegation.
• The Risk Management Strategy sets out a clear direction for how the council will
identify, assess, and manage the risks faced in providing high quality public services
and delivering The Plan for North Lanarkshire.  The strategy is intended to ensure that
the council is risk aware rather than risk averse and that the management of risk is
embedded in the council’s policies, procedures, culture, and practices. It is designed to
ensure that key decisions are taken with an understanding of risks and their effective
control.
• Risk management arrangements are well established and form an important element of
good corporate governance.  These are designed to ensure that the council operates
systematic and logical processes for managing risks within a comprehensive
framework, ensuring that identified risks are managed consistently, effectively,
efficiently, and coherently across the organisation. These arrangements include
maintenance of a Corporate Risk Register, Service Risk Registers, Project Risk
Registers, and regular oversight of the council’s risk management arrangements and
management of key corporate risks by the Audit and Scrutiny Panel and Corporate
Management Team, and other governing bodies as required.  A Programme Uncertainty
Level Status Evaluation (PULSE) assessment process was introduced during 2024 to
support the risk management arrangements for delivery of the Programme of Work.
• Codes of Conduct for Elected Members, Chief Officers, and Employees provide
frameworks within which individuals are expected to undertake their duties in a manner
which meets the required standards for good governance.  This includes ensuring
declarations of interests, and declarations for conflicts of interest and gifts and
hospitality, are appropriately (and regularly) made and published.
• Ensuring legislative obligations are fulfilled through the statutory officer roles, i.e. the
posts of head of paid service, monitoring officer, chief financial officer (section 95
officer), and the chief social work officer.
• The Counter Fraud Policy sets out the council’s expectations (that extends to all
individuals and organisations with whom it deals) in terms of acting honestly and with
integrity and in safeguarding public resources. 
• The Whistleblowing Procedure (Public Interests Disclosure) provides a mechanism for
employees of the council, and other workers within the council, to report a concern
about serious wrongdoing within the council and to do so with security and in
confidence.
• The senior management team structure comprises a Business Management Team (to
monitor the efficient and effective operation of the council and ensure pursuit of the
long-term vision set out in The Plan for North Lanarkshire is underpinned with the
relevant assurances and controls in terms of corporate governance, risk management,
and financial management), and a Corporate Management Team (to ensure strategic
oversight, direction, and a one council approach in terms of delivery of the vision
through the Programme of Work).  This is supported by a meetings structure comprising
service Senior Management Teams focussing on the operational delivery of service
remits, and an Operational Management Team to cascade the context, deliverables, and
accountabilities and ensure consistency of message in terms of the long-term vision and
day to day delivery through the Programme of Work.  All Chief Officers are members of
the Corporate Management Team; this includes those Chief Officers who hold a
statutory officer role.
• The activities and functions of the council’s Audit and Scrutiny Panel comply with the
standards set out in CIPFAs Position Statement: Audit Committees in Local Authorities
Page 103 of 108

Page 104

(2018).  The Panel’s purpose is to provide independent assurance to the council and
those charged with governance on the adequacy of the council's risk management
framework and internal control environment.  
• The Strategic Performance Framework sets out performance measurement at three
levels in order to collectively provide an overview of performance (over time and
compared to targets) to help understand the impact of council activities on improving
services and outcomes for the people and communities of North Lanarkshire.  These
measures also allow for day-to-day activities, and progress towards achieving the long-
term vision set out in The Plan for North Lanarkshire, to be regularly monitored,
reported, assessed, and scrutinised.  
• Formal reporting arrangements are in place through an annual Performance Reporting
Schedule that comprises Chief Officer reviews at service committees and service
specific reporting to meet both business and statutory obligations; this is underpinned
by five non-negotiable standards that support regular performance assurance reviews.
• Comprehensive revenue budget and capital expenditure guidelines along with well-
established processes and systems ensure regular monitoring and reporting, as well as
oversight and scrutiny through the council’s senior management team structure of
meetings and Elected Members at committee.
• A range of programme and project Boards and working groups are aligned to the
delivery and governance requirements for specific Programme of Work items, e.g.
Strategic Capital Delivery Group, six Strategic Programme of Work Boards, and Hub
Delivery Programme Board.
• The Data Governance Board maintains strategic oversight and implementation of the
council’s approach to data governance to secure relevant assurances that effective
arrangements are in place for the safe and secure collection, storage, use, and sharing
of data. This includes safeguarding personal data and promoting data quality in
accordance with legislative, regulatory, and corporate governance requirements. 
Responsibilities also include developing and overseeing the implementation of data
strategies, policies, procedures, and standards (including the Data Protection Policy,
Information and Cyber Security Policy, Payment Card Industry Data Security Policy,
Records and Information Management Policy, and the Acceptable Use of ICT Policy), as
well as directing continuous improvement in data governance and compliance,
overseeing the work and progress of the Data Management and Compliance Group,
and ensuring appropriate monitoring and assurance arrangements are in place across
the council and its arm’s length external organisations.
• The Information and Cyber Security Policy includes cyber security and aims to protect
the council’s information systems and physical assets including supporting processes,
networks, and equipment.  This is essential to ensure the council can continue to
operate and successfully deliver its functions, while finding the right balance between
the benefits and risks to the processing of information. 
• Publicly available complaints and freedom of information procedures are in place with
management, monitoring, and performance reporting arrangements.
• A range of employment and other policies, and associated guidance documents and
forms, promote and support ethical behaviour and standards of conduct by employees.  
• An employee Performance Review and Development (PRD) process is in place and
access to a range of training and development programmes and opportunities is
available through LearnNL for both employees and Elected Members.
• Strategic Workforce Plans, supported by service specific workforce plans, identify the
actions required to address workforce gaps and set out detailed service level actions to
address the risks and issues facing the current workforce and identify the gaps in terms
of fulfilling service provision and delivering on priorities and the long-term vision now
and in the future.
• Independent and objective assurances are provided by Internal Audit whose function is
designed to add value and improve the council’s operations.  The Internal Audit function
operates within the Public Sector Internal Audit Standards (PSIAS) and the council’s
Internal Audit Charter. The service undertakes an annual programme of work approved
by the Audit and Scrutiny Panel which is based on the Internal Audit Annual Plan. This
plan is risk based and is periodically updated to reflect evolving issues and changes.
• Independent and objective assurances are provided by the external auditors through the
Page 104 of 108

Page 105

Annual Audit Report (AAR) process and other audit, inspection, and regulatory bodies. 
The annual review and update of the Strategic Governance Framework is reviewed and endorsed
each year by the council’s senior management team (through both the Business Management
Team and Corporate Management Team) in line with their respective governance, strategic
oversight, assurance, and continuous improvement roles in respect of the council’s governance
arrangements and delivery of The Plan for North Lanarkshire. 
The Strategic Governance Framework, and its accompanying review programme, have been
recognised as an area of good practice in the latest three annual Internal Audits on Corporate
Governance.  As reported to the Audit and Scrutiny Panel in August 2024, the most recent Internal
Audit considered that the “council’s corporate governance arrangements in relation to self-
assessment are adequate and operating effectively” and therefore this audit was assessed as
providing “substantial assurance”. 
9) The Annual Audit Report (AAR) process undertaken by the external auditors, together with
the national approach to auditing Best Value through thematic audit work. 
Published in May 2019, the North Lanarkshire Best Value Assurance Report (BVAR) comprised
eight recommendations for action by the council.  Various updates have been provided to
committee since, and the external auditors Annual Audit Report (AAR) has provided updates every
year in terms of completed recommendations.  The Annual Audit Report (AAR) in October 2023
reported that all eight recommendations had been fully implemented and were now complete. 
As reported to the Audit and Scrutiny Panel, a new national approach to auditing Best Value came
into effect as part of the external auditor appointments for the five-year term from 2022/23.  This
approach is twofold and means that: 
• Auditing Best Value is integrated within the wider scope of the external auditor’s annual audit
work which is reported in their Annual Audit Report (AAR). This includes risk-based and
follow up audit work on Best Value related recommendations from previous audit reports as
well as reflecting on council reporting against priorities and in terms of the use of the Local
Government Benchmarking Framework (LGBF).
• Thematic Best Value audit work is undertaken each year by the external auditor as per the
Accounts Commission’s requirements to provide assurance on areas of risk / interest across
councils as at a defined point in time, thus enabling comparisons across Scotland.  This
means that each year the council undergoes an assessment of particular aspects of Best
Value in order to provide the Accounts Commission with the relevant assurances in terms of
performance and the quality of services to the public. 
Since the new approach was implemented, the various outcome reports (listed below) have been
able to be viewed through the Policy and Strategy Committee and/or the Audit and Scrutiny
Panel: 
Annual Audit Report (AAR) 
• 2022/23 report to Audit and Scrutiny Panel in October 2023.
• 2023/24 report to Audit and Scrutiny Panel in October 2024. 
Thematic report
• The council’s 2022/23 outcome report on the theme in respect of the leadership of the
development of new strategic priorities was presented to the Audit and Scrutiny Panel in
October 2023 and the Policy and Strategy Committee in December 2023.  The report for
the council in this respect identified three areas for improvement which have since been
implemented and signed off by the external auditors, these focussed on strategic planning
feedback, community engagement, and Elected Members training and development.
• The council’s 2023/24 outcome report on the theme for workforce innovation (specifically
how the council is responding to current workforce challenges through building capacity,
increasing productivity, and innovation) was presented to the Audit and Scrutiny Panel in
August 2024 and the Policy and Strategy Committee in September 2024. The report for the Page 105 of 108

Page 106

council in this respect identified three areas for improvement which are being progressed
during 2025/26, these focussed on acting on staff feedback, flexible and hybrid working
policies, and data in respect of the temporary workforce. 
The external auditors latest Annual Audit Report (AAR), reported to the Audit and Scrutiny Panel in
October 2024, presented key matters arising from each of the main areas of work undertaken by
the external auditor.  This included the audit of the financial statements and issues relating to the
council’s financial management and financial sustainability, vision leadership and governance, best
value arrangements, and the use of resources to improve outcomes.  The report contained the
external auditor’s audit opinion on the 2023/24 financial statements as well as a number of issues
where action was required during the audit process and/or scope for further improvement existed. 
The report also contained a small number of audit recommendations (summarised below) and
management responses, including planned actions, responsible officers, and timescales - which
are all scheduled to be implemented by March 2026. Progress in terms of implementing these
actions is monitored by Internal Audit and reported to the Audit and Scrutiny Panel.   
2023/24 Annual Audit Report (AAR) recommendations
• Management of assets - management should establish a process to ensure assets replaced
are appropriately removed from the asset register and accounted for as a disposal
appropriately.
• Statutory override - the council should proactively work with CIPFA and the wider local
government sector to arrive at appropriate solution for the implementation of accounting for
infrastructure assets.
• Reinforced autoclave aerated concrete (RAAC) - for those properties where RAAC has been
identified, the council should determine a more accurate measure of the level of impairment
in line with the requirement of accounting standards.
• Continuity and security of IT operations - the council should ensure there is appropriate
oversight of its continuity and security of IT operations and ensure the necessary assurances
are obtained for externally hosted systems.
• Public performance reporting - the council should improve its public performance reporting to
provide its citizens and communities with a clear summary of performance. 
2023/24 recommendations from the BV thematic report
• Acting on staff feedback - as the council develops its staff engagement approach, it should
ensure that as well as providing information to staff on council decisions, it also incorporates
the views of staff and trade unions to support transparent decision making, and evidence
how it is acting on findings from the Summer 2024 roadshow sessions.
• Hybrid working policy - the council should continue to monitor the impact of its hybrid working
approach. It should continually assess the impact of increasing the number of office days, in
terms of performance, staff wellbeing, and recruitment and retention.
• Temporary workforce - the council should include data reporting on its temporary workforce
as part of published workforce data, and once available it should include data on agency
workers. 
A key area of improvement implemented by the council during 2024/25 was to ensure ongoing
best value in terms of managing risk and ensuring business continuity plans (including civil
contingencies and emergency plans) are in place to allow an effective and appropriate response
to planned and unplanned events and circumstances.  This followed an Internal Audit review
undertaken on Business Continuity Planning in September 2022 which identified a number of
recommendations for action.  A subsequent Internal Audit was undertaken on Business Continuity
Planning which was reported to the Audit and Scrutiny Panel in May 2025 which included an
update on the progress made in implementing the previous audit’s recommendations and made
new recommendations, including the need to better align business continuity and disaster
recovery which is scheduled to be implemented during 2025/26.  This aligns to the review of the
council’s arrangements in respect of Business Continuity and ICT Disaster Recovery which was
included in the external auditors Annual Audit Report for 2023/24 (reported to the Audit and
Scrutiny Panel in October 2024). 
10) Findings from other audit, scrutiny, or inspection bodies in relation to service specific
assessments. Page 106 of 108

Page 107

A dedicated page on the council’s website provides a central location for reporting on findings and
recommendations from all national audits and inspections. This continues to be kept up to date as
and when new reports become available nationally.  Inspection reports published during 2024/25
include the following:   
• Scottish Housing Regulator annual assurance statement 2023/24 - August 2024.
• Scottish Housing Regulator annual landlord report 2023/24 - November 2024. 
11) The role of the council’s senior management team structure of meetings in respect of good
governance, assurance, and continuous improvement. 
The council recognises that a crucial aspect in delivering good governance is the way in which it is
applied as the ethos of good governance cannot be achieved by structures, rules, and procedures
alone.  Effectively, good governance needs to be embedded within the council and its culture and
the need for, and value of, good governance must be explicit.  As such, any references that require
to be made to any one of the frameworks supporting The Plan for North Lanarkshire does so in a
consistent manner to ensure completeness and to continue to raise awareness of the role of good
governance in delivering the strategic ambition.   
The role of, and need for, good governance is also reiterated in the Guidance accompanying the
Report Template which requires to be used for all council internal reporting purposes.   
Following implementation of a single integrated corporate forum for all Chief Officers in April 2021,
a subsequent self-evaluation exercise in 2022 to review the effectiveness of the revised
arrangements led to new arrangements in respect of the council’s senior management team and its
supporting structure of meetings being developed and implemented from January 2023.  This
comprises four aspects, as follows: 
(a) A Business Management Team whose role is “To monitor the efficient and effective operation
of the council” and to secure the relevant assurances that “the council is able to effectively
pursue the long-term ambition set out in The Plan for North Lanarkshire by ensuring this is
underpinned with the relevant assurances and controls in terms of corporate governance
[including performance, legal, and hr matters], risk management, and financial management. 
This means the Business Management Team role is that of assurance, not directing or
monitoring delivery unless the ongoing assessment of assurance requires improvement in
this respect. A four weekly Business Management Team meeting is held which comprises
standing agenda items for finance, governance, risk, performance, and human resources
and further demonstrates the ongoing commitment to ensuring corporate governance
arrangements are in place and remain effective.   
Reflecting the changes to the council’s senior management team structure as outlined in the
annual governance update report to committee in September 2024, the Chief Executive,
Depute Chief Executive, Section 95 Officer, and Monitoring Officer are members of the
Business Management Team as well as the Chief Officers of Audit and Risk, People
Resources, and Strategy and Engagement. 
(b) A Corporate Management Team whose role is “To consider the strategic context and
environment within which the council is operating, understand the position of the organisation,
and consider the future direction. To consider the implementation of strategic decisions at a
council wide level and the impact on the delivery of The Plan for North Lanarkshire and
Programme of Work. To agree the one council approach required in order to deliver on the
council’s priorities (in partnership where required) in line with the strategic direction and
monitor the delivery of the Programme of Work.”   This means the Corporate Management
Team role has a focus on improvement over time in delivering the council’s strategic priorities
through the Programme of Work. 
The Chief Executive, Depute Chief Executive, and all other Chief Officers are members of the
Corporate Management Team. 
Page 107 of 108

Page 108

Both the Business Management Team and the Corporate Management Team input to the
annual Strategic Governance Framework review process and to the review of the evidence
that informs the Annual Governance Statement - with a view to ensuring the council’s
governance arrangements and systems of internal controls remain effective and to identify any
improvement activity or future developments required to support continuous improvement. 
This ongoing commitment from the Business Management Team and the Corporate
Management Team ensures that good governance is supported from the top of the
organisation. 
(c) Four Service Management Teams (SMTs) - the annual governance update report in
September 2024 reiterated the four service groupings which were originally established in
September 2018, and which have continued to operate effectively since, i.e. Chief Executive’s
services, Enterprise and Communities, Education and Families, and Adult Health and Social
Care. 
The focus for these four SMTs is to manage the operational delivery of service remits.  They
are also required to consider the implementation of strategic and corporate decisions at a
service and/or service grouping level and to consider the context within which the service /
service grouping is operating and ensure decisions made in terms of operational delivery are
in line with good governance and support the successful delivery of the Programme of Work
and The Plan for North Lanarkshire. 
(d) Operational Management Team (OMT) - formally established in April 2021, this forum
comprises all senior managers and head teachers across the council.  It operates under the
principles of engage, develop, support, and inform to connect managers and enable them to
strengthen and support their teams to deliver on the Programme of Work in line with The Plan
for North Lanarkshire.  The OMT aims to provide a collaborative forum for discussions on the
practical aspects of delivering the Programme of Work.  This group is not a decision making
body; it is an information sharing forum.  Its focus is on providing opportunities to share and
discuss significant strategic and corporate developments, and potential integrations and
opportunities, with the wider operational management team environment across the council. 
5. Certification of assurance - on the level of assurance that the governance arrangements
provide. 
5.1 In compliance with the Delivering Good Governance in Local Government: Framework (2016) the
council has systems in place to review and improve the governance and internal control
environment throughout the year. Issues for action have been identified and implementation will
be monitored and reported as part of the next annual review.   
5.2  It is our opinion that reasonable assurance can be placed upon the adequacy and effectiveness
of North Lanarkshire Council and its Group systems of governance. The annual review process
has demonstrated sufficient evidence that the council’s corporate governance arrangements have
operated effectively, and the council and its group companies comply with the relevant corporate
governance principles in all significant respects. 
Chief Executive      Leader of the Council 
Page 108 of 108