North Lanarkshire Council · 8 May 2025
Back to Audit and Scrutiny Panel — 8 May 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

29 April 2025 
Members of the 
Audit and Scrutiny Panel
Chief Executive’s Office
Rachel Blair
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk 
Notice is given that a Meeting of the Audit and Scrutiny Panel is to be held in the
Committee Room 1, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on Thursday, 08
May 2025 at 14:00 PM which you are requested to attend. 
The agenda of business is attached. 
Rachel Blair
Chief Officer (Legal & Democratic) 
Members : 
Clerk Name: Clare Louise McDonald 
Clerk Telephone: 07350 435308
Clerk Email: committee@northlan.gov.uk 
S Watson, P Kelly, C Costello, A Duffy-Lawson, M Hughes, J Hume, D Johnston, J Leckie,
M McCulloch, J McLaren, G Robinson.  
Page 1 of 144

Page 2

Page 2 of 144

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical
Standards In Public Life Etc. (Scotland) Act 2000   
Scrutiny Related Items   
2 Strategic Performance Framework - Performance
Reporting Schedule Quarterly Performance
Assurance Review
Submit report by the Chief Officer (Strategy and
Engagement) setting out the outcome of the latest
quarterly performance assurance review, undertaken
on performance reports previously submitted to Council
Committee's during Cycle 1 of 2025. 
5 - 26  
Audit Related Items   
3 Audit and Risk Related Item - Action Log
Submit report by the Chief Officer (Audit and Risk)
allowing members to track implementation of
outstanding requests and recommendations made by
the Panel in respect of audit and risk-related items. 
27 - 28 
4 Internal Audit - Progress Report
Submit report by the Chief Officer (Audit and Risk)
providing an overview of Internal Audit activity and
audit reports issued since the last update to the Panel
in February 2025. 
29 - 78 
5 Internal Audit Annual Plan 2025-26
Submit report by the Chief Officer (Audit and Risk)
seeking approval of the Internal Audit Plan 2025-26. 
79 - 86 
6 Internal Audit - Follow-up of Implementation of
Audit Recommendations
Submit report by Chief Officer (Audit and Risk)
providing an update to the Panel on the progress made
by management in the implementation of Internal and
External Audit recommendations. 
87 - 110
Page 3 of 144

Page 4

7  Internal Audit Charter
Submit report by the Chief Officer (Audit & Risk)
seeking approval of the Internal Audit Charter, setting
out the purpose, mandate, authority and principal
responsibilities of the Council’s Internal Audit function. 
111 - 132 
8 Risk Management Update
Submit report by the Chief Officer (Audit and Risk)
providing an update on the Corporate Risk Register
developments since the last update to the Panel in
February 2025. 
133 - 144 
Page 4 of 144

Page 5

North Lanarkshire Council
Report
Audit and Scrutiny Panel 
Does this report require to be approved? ☒ Yes   ☐ No
Ref SP/SL Date 08/05/25 
Strategic Performance Framework - Performance Reporting
Schedule quarterly performance assurance review 
From  Stephen Penman, Chief Officer (Strategy and Engagement)  
E-mail PenmanSte@northlan.gov.uk Telephone 07725 289 559 
Executive Summary
The purpose of this report is to bring together a summary of the council’s performance
reports in one composite assurance overview to support the Audit and Scrutiny Panel in
maintaining strategic oversight and awareness of the council’s performance reporting
arrangements in line with the Panel’s remit to provide “independent review of the council’s
governance, risk management, performance, and control frameworks”. It also supports the
Audit and Scrutiny Panel’s governance and accountability role in terms of ensuring the
council can demonstrate Best Value through the existence of robust arrangements for
performance reporting and scrutiny.   
This process monitors reports which have been submitted to council committees (in line
with the Strategic Performance Framework - Performance Reporting Schedule) during the
previous cycle. This process began in 2023 following the initial annual Performance
Reporting Schedule at the Audit and Scrutiny Panel with implementation of a quarterly
performance assurance review report thereafter. 
This report herewith provides the Panel with the outcome from the latest quarterly
performance assurance review that has been undertaken on performance reports
previously submitted to council committees during cycle 1 of 2025 (in line with the
Performance Reporting Schedule for 2024 to 2025 which was at the Panel meeting in
February 2024).
Recommendations
It is recommended that the Audit and Scrutiny Panel: 
(1)  Review the composite overview of performance reporting provided in Appendices 1
and 2 to maintain an awareness of each report within the Performance Reporting
Schedule for 2024 to 2025, and
(2)  Identify whether there are any significant issues arising, from the composite
performance overview presented in the attached Appendices, that the Panel
considers requires additional scrutiny and a further report to be submitted from the
respective Chief Officer to a future meeting of the Panel (following review through the
Scrutiny Assessment and Prioritisation Process). 
Item 2
Page 5 of 144

Page 6

1. Background 
1.1 Members of the Audit and Scrutiny Panel will recall the report in February 2024 which
contained the Strategic Performance Framework - Performance Reporting Schedule.
This set out the reporting, review, and scrutiny arrangements for a range of
performance information to be considered at each cycle of committee meetings for
2024 to 2025. 
1.2 The Strategic Performance Framework comprises performance
measurement at three levels (as per the diagram on the right).  This
aims to collectively provide an overview of performance to help
understand the impact of council activities on improving services
and outcomes for the people and communities of North
Lanarkshire.  The measures in this Framework allow for day-to-day
activities, and progress towards achieving the long-term vision set
out in The Plan for North Lanarkshire, to be regularly monitored,
reported, assessed, and scrutinised.   
1.3 The supporting Performance Reporting Schedule forms a key part of the Scrutiny Work
Programme that underpins the Best Value governance and accountability theme by
ensuring the council can demonstrate the existence of robust arrangements for scrutiny
and performance reporting.  It also aims to fulfil the Audit and Scrutiny Panel’s remit as
per the Scheme of Administration to:
• Review and monitor the performance of the council in delivering upon its priorities,
outcomes, programme of work and targets in the council plan, specifically
performance in improving local services and outcomes and in demonstrating Best
Value.
• Review performance to assess whether intended policy outcomes have been
achieved. 
1.4 The Strategic Performance Framework comprises a set of non-negotiable standards
which Chief Officers are required to apply in all performance reporting that supports the
Framework.  These standards aim to ensure that performance reporting is:
• Aligned - to The Plan for North Lanarkshire to give stakeholders an insight into the
performance of council activities both in the short-term and against the long-term
ambitions.
• Consistent - to ensure a standard, easily recognisable, and well-established
process across each different audience over time.  This aims to help build
credibility, reliability, and a common understanding.
• Transparent - to allow stakeholders to understand what is being measured, what
it means, what level of performance has actually been achieved, and what
difference this means in reality for the people and communities of North
Lanarkshire.
• In context - to avoid the So What? question and provide a coherent narrative to
ensure fully informed review, reporting, scrutiny, and decision-making processes.
• Balanced - to ensure any text adds value and tells a balanced narrative. 
Performance reports should identify areas requiring improvement as well as areas
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Page 6 of 144

Page 7

of good performance.  Narrative should include reasons for performance levels not
in line with targets and the remedial action undertaken to address this. 
1.5 The Performance Reporting Schedule shows there is a significant volume of
performance information timetabled to be reported to various council committees in
each cycle of 2024 to 2025. Cycle 1 2025 reports were reviewed by the Business
Management Team in April 2025 to ensure the relevant assurances in terms of
performance management arrangements that promote effective use of the council’s
resources, performance information being scrutinised at a senior management level,
and performance monitoring arrangements in place to effectively address areas of
underperformance, identify the scope for improvement, and agree remedial action. 
1.6 The volume of performance information in the cycle 1 2025 reports has been reviewed
and summarised further in Appendices 1 and 2 attached. It should be noted that the
performance information within Appendices 1 and 2 has already been reviewed by
Service Committees during cycle 1 of 2025.  The purpose of the information presented
herewith is therefore to provide Audit and Scrutiny Panel members with a composite,
but easily digestible, overview for governance and assurance purposes in line with the
specific scrutiny and strategic oversight role of the Panel. 
1.7 Should the Panel consider there are any significant issues arising from the composite
performance overview which require additional scrutiny, these matters will be reviewed
through the Scrutiny Assessment and Prioritisation Process (updated and approved by
the Panel in September 2022 and further endorsed in September 2023), prior to being
added to the Scrutiny Work Programme for a further report to be submitted from the
respective Chief Officer to a future meeting of the Panel. 
2. Quarterly performance assurance review 
2.1 The Strategic Performance Framework - Performance Reporting Schedule sets out
several aspects of performance reporting.  As part of this, paragraphs 2.2 to 2.6 itemise
the performance reports submitted to cycle 1 2025 committees in accordance with the
timetable set out in the Schedule. 
(1) Chief Officer’s individual Performance Review reports at Service Committees in
line with the Strategic Performance Framework.
(2) Chief Officer service specific performance reporting which takes place each year
to meet business and/or statutory obligations. 
(1) Chief Officer’s individual Performance Review reports at Service Committees in
line with the Strategic Performance Framework. 
2.2 The Strategic Performance Framework comprises a range of performance indicators
from each Chief Officer’s portfolio and the latest results in this respect are aligned to
the respective ambition statements in The Plan for North Lanarkshire. The two reports
previously submitted to the relevant committee in cycle 1 of 2025 are listed in Table 1
below, along with the corresponding hyperlink for ease of access.   
Table 1
Report title Committee Date
Strategic Performance Framework - latest
performance results - Legal and Democratic
link to report
Finance and
Resources
Committee
26 February
2025
Page 7 of 144

Page 8

Adult social care performance - Quarter 2 (July to
September 2024) 
link to report
Adult Care and
Social Work
Committee
18 February
2025 
2.3 Each council report was produced in line with a standard template and (a) provides the
reader with the current context within which the service is operating, (b) highlights areas
of good performance that can be evidenced in the accompanying data, and (c) provides
a summary of areas of performance requiring improvement along with narrative that
gives an explanation for the level of performance achieved and summarises the
remedial action implemented (or to be implemented) to bring performance back on
track.   
2.4 A short summary analysis for each of the reports is set out in Appendix 1 against the
five non-negotiable standards. 
(2) Chief Officer service specific performance reporting which takes place each year to
meet business and/or statutory obligations. 
2.5 This aspect relates to service specific reporting which is required to meet business
and/or statutory obligations.  This is included in the Performance Reporting Schedule
to ensure all the council’s performance reporting arrangements are captured in the one
place and the Schedule reflects a one council approach to performance reporting.   
2.6 The 10 reports previously submitted to the relevant committee in cycle 1 of 2025 are
listed in Table 2 below, along with the corresponding hyperlink for ease of access. A
short summary for each of these reports is set out in Appendix 2.  While this summary
is set out against the five non-negotiable standards it recognises there may also be
statutory specific approaches or standards which require to be adhered to. 
Table 2
Report title Committee Date
Freedom of Information annual report 2023/24
link to report
Finance and
Resources
Committee
26 February
2025
Senior Information Risk Owner (SIRO) annual
assurance and performance report 2024
link to report
Finance and
Resources
Committee
26 February
2025
Public Sector Duties climate change annual report
2023/24
link to report
Environment and
Climate Change
Committee
5 February
2025
North Lanarkshire Community Planning Partnership:
annual oversight and outcomes report 2023/24 
link to report
Communities
Committee
3 February
2025
Local Outcome Improvement Plans (LOIP)
performance report - April to September 2024 
link to report
Communities
Committee
3 February
2025
Education performance update
link to report
Education, Children,
and Families
Committee
25 February
2025
Revenue and Benefits update
link to report
Finance and
Resources
Committee
26 February
2025
Financial monitoring report - council summary
(revenue)
link to report
Finance and
Resources
Committee
26 February
2025
Page 8 of 144

Page 9

Financial monitoring report - council summary
(capital)
link to report
Finance and
Resources
Committee
26 February
2025
Financial monitoring - savings 
link to report
Finance and
Resources
Committee
26 February
2025 
Next steps 
2.7 Assurance reviews will continue to be undertaken and reported to the Audit and
Scrutiny Panel on a quarterly basis in order to maintain the measures of success set
out in paragraph 3.1. 
2.8 The content of the quarterly assurance review reports will be informed by the annual
Performance Reporting Schedule for which an updated in respect of 2025/26 reporting
is scheduled to be presented to the Audit and Scrutiny Panel meeting in cycle 3 of 2025. 
2.9 Reports submitted to the respective committee (in line with the Schedule) will continue
to be kept under review by the senior management team of the council so that
adherence to the timetable is maintained.  This will also seek to ensure the relevant
assurances in terms of the efficient and effective operation of the council and that the
ongoing delivery of the long-term ambition set out in The Plan for North Lanarkshire is
underpinned with good corporate governance. 
3. Measures of success 
3.1  Measures of success include:
• Regular oversight and monitoring of performance across the organisation to gain
assurances in terms of governance and accountability.
• Regular review and challenge processes to scrutinise the performance of the
council to ensure effective use of resources and that resources are directed in
accordance with agreed policy and according to priorities, while ensuring sound
decision making and clear accountability for the use of resources in achieving
improved outcomes for service users and the local community. 
• Performance monitoring, management, and reporting arrangements that support
the demonstration of improved performance in local services and outcomes, and
the delivery of Best Value. 
4. Supporting documentation 
Appendix (1) Chief Officer’s individual Performance Review reports at Service
Committees in line with the Strategic Performance Framework.
Appendix (2) Chief Officer service specific performance reporting which takes place
each year to meet business and/or statutory obligations. 
Stephen Penman
Chief Officer (Strategy and Engagement) 
5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Page 9 of 144

Page 10

Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The Local Government Act 1992 established the role of the Statutory Direction to
direct councils in terms of the “publication of information as to standards of
performance”.  
The Local Government in Scotland Act 2003 introduced the duty of Best Value; this
requires that councils “make arrangements to secure continuous improvement in
performance”.  
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 10 of 144

Page 11

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Implementation of the Schedule, which aims to facilitate regular review and scrutiny
processes, contributes to the mitigation of the risk on the Corporate Risk Register
for governance, leadership, and decision making.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 11 of 144

Page 12

Appendix 1 
(1) Chief Officer’s individual Performance Review reports at Service Committees in line with the Strategic Performance Framework. 
Report title Summary
SPF - Latest performance
results for Legal and
Democratic 
February 2025
Legal and Democratic has 8 indicators in the Strategic Performance Framework.  Significant areas of activity across the service (within each of the
areas of service delivery, i.e. democratic and resources, enterprise, and litigation) are carried out in support of other council services and,
accordingly, performance targets are often not within the sole gift of Legal and Democratic. The indicators monitored through the Strategic
Performance Framework therefore focus on those areas where the service does have control of performance. Performance across all of these
areas is monitored, as required, at fortnightly extended management meetings chaired by the Chief Officer.
Aligned Priority:  • Improve North Lanarkshire’s resource base.
Ambition statement: 21. Continue to identify and access opportunities to leverage additional resources to support our ambitions. 
25. Ensure intelligent use of data and information to support fully evidence based decision making and future planning.
Consistent The pre-defined template was used to ensure a standard, easily recognisable, and well established process across each different audience over time.  The use
of this template aims to help build credibility, reliability, and a common understanding.
Transparent  RAG indicators: 
In context The service restructured in April 2024 reducing the number of sections from four to three - Democratic and Resources, Litigation, and Enterprise. The
implementation of the structure is to be finalised, but the service continues to face pressures on account of vacancies as a result of a difficulty in recruiting and
retaining some posts. This has resulted in increased pressures on meeting demand, but all possible and practical steps are being taken to address this,
including increasing resources and introduction of a case management system. The service has implemented efficiencies in service delivery in Licensing,
including streamlining processes and adopting a more digitised strategy. This has improved the customer experience and reduced the time that matters are
brought before the Licensing Board and Regulatory Committee for determination. The service is continuing to review and implement efficiencies in Registration
both to meet customer demand and in preparation for One Number.
Balanced Performance highlights: 
• The service continues to perform well in the processing of Freedom of Information and Registration which are assessed by national regulators in the terms
of quality and accuracy of service reports. These are reported to Committee on an annual basis, and these will continue to be monitored to ensure that each
service area achieves the best possible performance outcomes.  Page 12 of 144

Page 13

• Given the digitisation of service areas, consideration is being given to key performance indicators for both internal clients and external customers and should
meaningful performance information be available, these will be reported in due course.
Areas of performance requiring improvement:
• The reason for the red status in respect of the increased cost per hour for legal services is due to a combination of increased staffing costs (due to national
collective bargaining) together with the associated on-costs and the filling of a number of vacancies leading to an increase in the number of chargeable
hours. 
• With regards to the hours spent providing legal services, this figure was revised following a reduction in sickness absence leading to an increase in the
overall staff time recorded. As these are factors outwith the control of the service, consideration will need to be given to an adjustment of the targets so that
these are reflective of the actual position going forward.
• Performance in the indicator for children’s panel expenses was impacted by a reduction in full-time equivalent staff due to secondment elsewhere and other
competing council priorities. This indicator was new for 2023/24 and, as such, the target was set at 100%. Consideration will also be given to an adjustment
to this target once trends have been established.
Report title Summary
Health and Social Care
performance update -
Quarter 2 (July -
September 2024) 
February 2025
The Chief Officer (Health and Social Care North Lanarkshire) has joint quarterly performance review meetings with the Chief Executives of NHS
Lanarkshire and North Lanarkshire Council. These meetings are supported by a Chief Executive’s Performance Framework which comprises a
range of performance measures taken from across both the health and social work systems, including relevant targets and trajectories for the
measures presented. 
In each quarter there are areas for improvement identified within the performance framework; these are identified using a RAG rating and those
measures that are flagged as Red or Amber are subject to improvement or corrective action. The performance review meetings are used as a
means for jointly agreeing these actions.
Aligned Priority:  • Improve the health and wellbeing of our communities.
Ambition statement: 12. Ensure our residents are able to achieve, maintain and recover their independence through appropriate supports at home and in their
communities.
13. Improve preventative approaches including self-management and giving people information and choice over supports and services.
14. Ensure the highest standards of public protection.
Consistent A pre-defined Health and Social Care Partnership template is in place to ensure a standard, easily recognisable, and well established process for quarterly
reporting on areas for improvement.
Transparent Based on a traffic-light system there are areas for improvement identified within the performance framework each quarter for those areas that are flagged as
Red or Amber.  The areas for improvement identified are progressed as a matter of priority, and progress updates are reported at future meetings of the
Integrated Joint Board and/or the Integration Joint Board Performance, Finance, and Audit Committee as appropriate.
In context • The joint performance review meetings (involving the Chief Officer for the Health and Social Care Partnership, the Chief Executive of NHS Lanarkshire, and
the Chief Executive of North Lanarkshire Council) are used as a means for jointly agreeing corrective actions within the current operating environment.
• The report describes the progress that has been made in pursuit of the national health and wellbeing outcomes and recognises that this progress has been
made against a challenging position of recovery and remobilisation of services following the pandemic, which is reflected in the performance in some of the
metrics presented in the report.
Balanced The purpose of the report is to provide an update on the areas for improvement what have been identified as part of the quarterly performance review.  The
quarter 2 report (for July - September 2024) sets out corresponding narrative and corrective actions agreed for the areas identified for improvement; the
narrative and corrective actions are summarised below.  Page 13 of 144

Page 14

• Reablement and rehabilitation - During 2023/24, the number of people completing the reablement process increased, however in 2024/25 there has been a
reversal of this trend. The percentage of new or increased home support packages that are reablement is relatively stable but below the targeted level of
70%. However, the percentage of people with no, or reduced home support at the end of the reablement process has not met the targeted level of
performance. Additional data / information on reablement is available from another dataset which shows that throughout 2024/25, the overall number of
referrals has decreased, however it should be noted that this decrease follows a notable and significant increase at the start of the financial year. There is no
target set for this metric; however it complements the reablement information presented and should be considered in the context of a wider system of
reablement, rehabilitation, and home support.
• Home assessment team data - Since its inception, the home assessment team has accepted 2,645 referrals, with October 2024 recording a peak of 147
accepted referrals. This marks the tenth month within the past year where accepted referrals exceeded 100, and the ninth consecutive month of such
volume.  Wishaw and Cumbernauld each contributed 22% of the total referrals over the past year, while Motherwell and Airdrie accounted for 18% and 17%
respectively. Bellshill and Coatbridge have shown increases in recent months, now contributing 9% and 12% respectively to the total overall volume of
referrals. University Hospital Wishaw has 50% of referrals, University Hospital Monklands in Airdrie at 47%. The majority of referrals (60%) are female, with
40% aged 75-84 years. Only 10% of referrals are for individuals under 65, and none for those under 18. A recent data clean-up has ensured that no
unknown ages are recorded. 2% of referrals had no input services, which is a slight decrease; data cleansing is identifying older and those cases where
there is incomplete data. The majority of referrals (59%) had 1 or 2 services, while 40% had 3 or more services, an increase from the previously reported
35%.  Home support remains the most utilised service (86%), followed by occupational therapy (62%). Physiotherapy services have notably increased from
20% to 27%. Re-admission to hospital at the end of the home assessment team process remains a concern, with 14% of individuals being re-admitted.
Upon completion of the home assessment team process, 64% of individuals required no further service, while 36% needed at least one additional service.
Of those needing further services, 74% required one service and 26% needed two or more.
• Adult social work - In Quarter 2 of 2024/25, North Lanarkshire Social Work services received fewer Adult Support and Protection (ASP) referrals than during
the same period last year. However, there was a notable increase in the number of Police adult concern reports when compared with the same quarter in the
previous year. The general increase in volume of Police adult concern reports is indicative of the developing role of Police Scotland as a key partner to
Social Work services, however it may also represent an unmet need or changing demand within the community.  There was significant variation in the
monthly referral rates across the six localities. Notably, Cumbernauld saw a 9% increase in referrals from the previous year, while Coatbridge and Bellshill
saw significant decreases of 44% and 31%, respectively. Care home referrals dropped significantly, likely due to collaborative efforts with local care homes
to reassess reporting thresholds and provide alternative support options.  Out of the 743 ASP referrals received, 10% (72) were redirected to other services,
while 27% (206) progressed to investigation. 50% (373) were recorded as No Further Action under ASP procedures, although many of these cases still
required interventions to promote welfare. The number of ASP investigations carried out this quarter rose significantly to 206, a 76% increase compared to
117 investigations in the same period last year. However, only 6% (13) of these investigations progressed to an initial case conference, a slight decrease
from last year's 10%. 
Page 14 of 144

Page 15

Appendix 2 
(2) Chief Officer service specific performance reporting which takes place each year to meet business and/or statutory obligations. 
Report title Summary
Freedom of Information -
annual report 2023/24 
February 2025
This report provides details of Freedom of Information (FOI) and Environmental Information Regulation (EIR) requests received by the council
during 2023/24 as well as information on internal reviews and appeals to the Scottish Information Commissioner. 
The Freedom of Information (Scotland) Act 2002 and the Environmental Information (Scotland) Regulations 2004, provide rights to the public to
ask for and be provided with recorded information held by public authorities. The Environmental Information (Scotland) Regulations 2004 sit
alongside the Freedom of Information legislation and govern access to environmental information such as planning matters, contaminated
land, emissions, etc. Once a Freedom of Information or Environmental Information Regulation request is received the council has, in most
cases, 20 working days to provide the information asked for, or explain why it cannot be provided. If the council does not respond, or the
requester is unhappy with the response, the requester can ask for an internal review. If the requester is still dissatisfied following the internal
review, they can then appeal to the Scottish Information Commissioner.
Aligned Priority:  • Enhance participation, capacity, and empowerment across our communities.
Ambition statement: 20. Improve the involvement of communities in the decisions, and development of services and supports, that affect them.
Consistent • The report provides an annual update on the volume of Freedom of Information and Environmental Information Regulation requests the council received
each month during 2023/24 and provides comparisons in terms of an increase of decrease in volume over the past 12 years.
• As in previous years reports, the volume of requests has been categorised to identify whether these were from members of the public (with no identifiable
affiliation to a particular organisation, group, or company), elected representatives (i.e. Elected Members, MPs, MSPs, and parliamentary researchers
acting on their behalf), businesses and commercial enterprises, the media, or solicitors acting on behalf of a client. 
• The volume of requests for an internal review of the original decision is also reported with an indication of the outcome of this review (i.e. whether
requests were wholly or partially upheld or deemed compliant) as well as comparisons to previous year.
• Information is also provided in terms of requests appealed by the requester to the Scottish Information Commissioner. 
Transparent • The report advises that 1,780 requests were received in 2023/24 (1,408 were Freedom of Information requests and 372 Environmental Information
Regulation requests, this is a 10.5% increase in volume of requests received compared to 2022/23, and a 26% increase from 2021/22. It is noted that
this high number of requests is reflected nationally and the Scottish Information Commissioner states in their annual report that 95,361 requests were
received by Scottish public authorities in 2023/24 and this is the highest reported yearly total since data collection began.
• 39% of requests received in 2023/24 were recorded as being received from public and other (i.e. members of the public with no identifiable affiliation to a
particular organisation, group, or company).  The next largest category of requests (15%) was those received from elected representatives (i.e. Elected
Members, MPs, MSPs, and parliamentary researchers acting on their behalf). 14% of requests were from businesses and commercial enterprises, 14%
came from the media, and 7% came from solicitors acting on behalf of a client. 
• In 2023/24, 24 requests for internal review of the original decision were received. Despite the increase in requests this year, this total is only slightly
higher than the 22 requests for review received in 2022/23. The 24 requests received for internal review represents 1.3% of the total number of requests
received by the council. This proportion is consistent with that seen last year and is lower than the national figure reported by the Scottish Information
Commissioner of 3% of requests resulting in an internal review.
• Of the 24 internal reviews, in 21 cases the original decision was either wholly or partially upheld or deemed compliant. In one case the original decision
was overturned and received a fresh decision at review. One review was undertaken because there was no response to the original request and one
internal review was withdrawn. One request received in 2023/24 was appealed by the requester to the Scottish Information Commissioner. This appeal is
still being considered by the Commissioner and the outcome will be reported in next year’s report.  Page 15 of 144

Page 16

• Of the 1,780 requests received in 2023/24, 25 were not fully progressed due to factors such as clarification required to progress the request not being
received or the requester withdrawing their request. Of the remaining 1,755 requests that were fully progressed, 1,732 (98.7%) were responded to within
the statutory 20 working day deadline. This compares with a compliance rate of 98.7% in 2022/23 and 98.5% in 2021/22. 
• The Scottish Information Commissioner's self-assessment toolkit for public authorities on responding to requests on time considers a response rate to
requests of 96-100% as excellent, 85-95% as good, 80-84% as adequate, and less than 80% as unsatisfactory.
In context • Following the 2022/23 consultation on access to information rights, the Scottish Government has set out it’s Freedom of Information policy objectives for
2024 to 2026. The objectives are to be taken forward in the following three workstreams: 
1. Consideration and use of Scottish Ministers’ powers to extend coverage of the Freedom of Information (Scotland) Act.
2. Updating statutory guidance for Scottish public authorities. 
3. Maintaining full Freedom of Information coverage of public sector in Scotland. 
• Any changes to Freedom of Information legislation, or statutory guidance, resulting from these workstreams will be reported to future meetings of the
Finance and Resources Committee.
Balanced • Appendices to the report provide the total number of requests received under either the Freedom of Information (Scotland) Act 2002 and the
Environmental Information (Scotland) Regulations 2004 broken down by month.  Information is also provided regarding the type of requestor and details
of cases submitted for internal review.
Report title Summary
Senior Information
Risk Owner (SIRO) -
annual assurance and
performance report
2024 
February 2025
This report provides an update relating to the responsibilities of the council’s Senior Information Risk Owner (SIRO). A SIRO is a professional role,
which has responsibility for implementing and managing information risks within the organisation. 
This report aims to provide assurances that information risks are being effectively managed to ultimately enable the council to comply with
legislative requirements and good practice.  It summarises the Data Governance Board’s oversight of information governance arrangements for
the period January to December 2024 and provides the SIROs assessment of the council’s existing information governance and data accuracy
arrangements. 
It outlines what is going well, highlights key matters of concern, and details the improvement actions to be progressed during 2025 to strengthen
the council’s information governance arrangements. 
Following on from the change to the reporting cycle implemented during 2023/24, this annual SIRO report relates to the calendar year 2024 in
order to provide Elected Members with an up-to-date snapshot of current information governance management arrangements.
Aligned Priority:  All priorities. 
Ambition statement: All ambition statements.
Consistent • The SIRO role is mandatory for public sector organisations and organisations which are contracted to deliver services under the NHS standard contract.
The report sets out the SIRO responsibilities which includes:
• Leadership and overall ownership of the council’s corporate governance action plan in terms of acting as corporate champion for information
governance.
• Acting as Executive Sponsor and advocate for the management of information governance at a senior level.
• Providing advice and reports in respect of information incidents and risks, including informing the content of the council’s Annual Governance
Statement relating to information risk. 
• Owning the management of information governance and associated risk assessment processes within the council. 
• Understanding how the strategic priorities of the council may be impacted by information governance risks, and how these risks need to be managed Page 16 of 144

Page 17

including the adequacy of resources and levels of independent scrutiny.
Transparent • The report advises that SIRO responsibilities have been aligned with the Chief Officer (Business and Digital) remit since September 2019, but following
consideration of the One Place, One Plan - Governance update report at Policy and Strategy Committee in September 2024, this responsibility will transfer
to the Chief Officer (Legal and Democratic Services) during 2025. 
• Previous SIRO reports have confirmed the council operates effective information governance management arrangements, having undertaken and
delivered significant technical and process improvements over recent years.  The report also reiterates that the council is committed to effective
information governance with sound arrangements for ensuring compliance with legislation and recognised best practice appropriately managed as part of
the council’s risk management and corporate governance arrangements. 
In context • The report complements the Corporate Data Protection Officer’s annual report to the Finance and Resources Committee and sets out any breaches of
confidentiality and security considered by the Data Governance Board during the reporting period, alongside assessment of the remedial actions identified. 
• It includes a focus specifically on ICT security and cyber risks which highlights the scale of the cyber security threat now facing all organisations and details
activities undertaken through Business and Digital to mitigate cyber risks and maintain positive information governance assurance. The report also details
corporate governance activities (such as training and data quality improvements) being undertaken to enhance and strengthen the council’s approach to
managing its information risks and details actions taken to maintain compliance with the Public Records (Scotland) Act 2011.
• The report advises that progress against areas of improvement will be managed through Data Governance Board oversight arrangements, who will look to
further develop policies, guidance, standards, processes, and approaches (as appropriate) to improve awareness, understanding, and compliance with
legislative requirements and good practice. 
• With a residual risk score of 20 prevalent in respect of the risk for Information Governance and Information Security on the council’s Corporate Risk
Register, the report notes that it is essential this subject matter remains as a high priority improvement area for the council. Progress in terms of ongoing
monitoring and assurances, as well as implementation of improvements, is therefore managed by the Data Governance Board who will look to further
develop policies, guidance, standards, processes, and approaches as appropriate to ensure continuous improvement in all information governance
management arrangements.
Balanced • The covering report is supported by a very detailed appendix which highlights performance and activity undertaken over the reporting period to ensure
personal data is held securely, and information disseminated effectively. Key highlights include information in respect of the following: 
• The information security and information governance corporate risk which is monitored in accordance with residual risk ratings, with corresponding
mitigating actions identified and deployed. 
• Reported data breaches which are comparable with calendar year 2023, with improvements evident in the number of breaches reported to legal
services within the required 72 hours. A higher percentage of breaches met the threshold for reporting to the Information Commissioner’s Office (ICO),
but the ICO did not apply any enforcement action or fines in respect of these.
• The council continues to follow published National Cyber Security Centre (NCSC) guidance, with several activities undertaken to mitigate against
potential cyber security threats, including maintaining compliance with Public Sector Network (PSN) and Payment Card Industry Data Security
Standard (PCI DSS) requirements, fully deploying protection, preventative and detective tools, further developing information security standards, and
transitioning all critical products to more secure and modern cloud-hosted solutions.
• An assessment of the council’s Data Maturity Score during 2024 confirmed that delivery of improvement actions over recent years has resulted in the
council’s maturity score improving from +1 (Initial/Basic) to -3 (Developing), an excellent achievement given the benchmark score for similar
organisations is 2+ (Basic).  
• Increased oversight and monitoring of mandatory training activity which has resulted in compliance levels vastly improving; for example, non-
compliance as at 7th December for the Data Protection Essentials module ranges from only 2% for Chief Executives to 16% for Adult Health and Social
Care. Members should note that non-compliance between 0% and 20% is RAG rated as Green. 
• Continued delivery of actions agreed with the Keeper of the Records of Scotland in respect of File Plan, Destruction Arrangements, Vital Records, and
Audit Trail. 
• Complementing the Corporate Data Protection Officer’s annual reports to the Finance and Resources Committee, the SIRO report (and its annexes)
provide further details regarding data breaches identified during the reporting period, and the guidance and remedial actions applied following their Page 17 of 144

Page 18

assessment. 
• ICT security and cyber risks - these highlight the scale of the cyber security threat now facing all organisations and detail activities undertaken through
Business and Digital to maintain a positive information governance assurance and mitigate against potential cyber risks. This section confirms that the
council was not affected directly by any notable cyber incidents during the reporting period. 
• Addressing high-risk vulnerabilities in ageing critical systems is considered a key priority for 2025, with this section confirming that actions are identified
and largely underway through the approved Digital North Lanarkshire Programme of Work and capital investment programme to address this growing
risk. 
• The report sets out the next steps which includes details in respect of an improvement plan which highlights activities planned for 2025 to strengthen
existing arrangements, i.e. raise the profile and prioritisation of Data Protection responsibilities, refresh and strengthen approach to mitigating cyber
security risks and vulnerabilities, iterative deployment of the Data Governance Board approved workplan, and enhanced implementation of the council’s
strategic approach to data and information management in line with the Programme of Work to 2028. 
Report title Summary
Public Sector Duties
climate change
annual report 2023/24 
February 2025
• The Climate Change (Duties of Public Bodies: Reporting Requirements) (Scotland) Order 2015 introduced a legal obligation for public bodies
to report annually detailing their compliance with the duties specified in the Climate Change (Scotland) Act 2009 and its subsequent
amendments. The report is produced annually for the most recently completed financial year with a national submission date of 30th November
each year.
• The report provided the Environment and Climate Change Committee with a summary of the content of the Public Sector report on Compliance
with Climate Change Duties submitted on behalf of the council in November 2024 for the 2023/24 reporting year.  It also provides an update on
progress against carbon budgets set within the council’s Climate Plan ACT2030 and also key points in respect of delivering the Sustainable
Futures Programme of Work.
Aligned Priority:  All priorities.
Ambition statement: All ambition statements.
Consistent • A standard report template is provided to all local authorities which comprises a number of sections which require information on the organisation’s profile,
governance, emissions and projects, adaptation, procurement, and validation as well as a non-mandatory section in relation to wider influence.  Within the
council, this information is collated annually and verified for submission by the relevant council service.
• The report follows on from that at Committee in 2023 which advised that the organisational carbon boundary (a list of the emissions that is reported) would
increase. This is in line with the Public Sector Leadership on the Global Climate Emergency 2021 which states “There is now a strong demand among the
sector for robust, consistent and comprehensive measurement and reporting of the entire carbon footprint of public bodies to support the accelerated
action now needed.”
Transparent • The February 2025 report shows a summary of the council’s annual footprint in terms of emissions (tCO2e) from the baseline year (2015/16) to the end of
the latest reporting year (2023/24).  This includes the annual emissions target set.  A list of the council’s consumption and resulting emissions is also
contained within an appendix to the report.  
• For 2023/24 the council’s footprint was reported as 62,124 carbon tonnes equivalent (tCO2e).  Measuring the original boundary against the baseline
showed that there was a continued decrease in emissions with an overall reduction of 1.4% from the previous year’s report and an overall reduction of
48.5% from the baseline year of 2015/16.
• The report also highlights the need to retain the Climate Plan ACT 2030 carbon targets and budgets until the publication of the council’s Net Zero Pathway
later this year.
• The statutory reporting process is supported by the Sustainable Scotland Network who also analyse the annual submissions from the public sector bodies’
reports and report their overall findings publicly.  This includes identifying strengths and weaknesses ( https://sustainablescotlandnetwork.org/reports ).
In context The report advises that: Page 18 of 144

Page 19

• In support of the 2019 climate emergency ambition to realise net zero by 2030, the council published its Climate Plan ACT2030 in 2021 which included a
series of thematic carbon budgets that were intended to drive down the council’s scope 1 and 2, as well as scope 3 emissions.
• Meaningful climate action is underway in key areas within the council’s Sustainable Futures Programme of Work Board which has committed producing a
new net zero pathway which will contain costed actions resulting in a realistic timescale and targets. Work on this commenced in August 2024 with a
workshop that key officers and chief officers (and the responses to the questions) considered have helped to inform development of the net zero pathway
which is being further explored with individual services in terms of their contributions to the action plan. 
• A draft climate plan template has been developed by Environmental Standards Scotland on behalf of the Scottish Government with the intent that the
format can be adopted as local authorities update their climate plans. It is expected that this will be on a voluntary basis initially with an eventual hard stop
date. Due to the timing of the council’s next plan i.e. the Net Zero Pathway, officers involved have opted to adopt the template to negate the need for
unnecessary rework of what will be a live document. 
The report also advises that the council has a duty to act in a way that supports the successful delivery of the Scottish National Adaptation Plan 2024-29 and
work is already underway to enable North Lanarkshire to become more resilient to climate change (this is known as adaptation) by incorporating adaptation in
the Net Zero Pathway as one its key themes which will be supported by direct and facilitating action. It will align with outcomes set within the national plan, i.e.
nature connects, communities, public services and infrastructure, economy, business and industry, and international action.
Balanced The report highlights some of the council’s climate activity and actions which contribute to reducing North Lanarkshire’s emissions as well as encouraging
more sustainable practices within the area, this includes:
• The City Deal team (Place) have incorporated carbon management into their large-scale infrastructure projects through project development and in time,
project delivery, to take account of the whole life cycle of a project, developing carbon management plans, where appropriate, to manage the impact of
both the implementation and end use of the infrastructure. 
• Procurement - The councils 2023/24 Procurement Strategy includes provision as to how the council will procure the supplies, works, and services required.
In line with the legislative framework for sustainable public procurement in Scotland the following sustainable procurement objectives are incorporated:
• Internal procurement rules, documents, and toolkits updated to reflect the new legislation.
• Embedding the use of sustainability tools within procurement processes (e.g. the sustainability test, the prioritisation tool, and the flexible framework). 
• Non-domestic energy efficiency project - This incorporates a performance guarantee contract which ensures that savings projected via the delivery of
various measures are assured. Due to the scale of the project the current phase has continued over from last year. The project is due to be completed  in
February 2025 and will see energy conservation measures such as insulation, LED lighting, and solar panels that will deliver a 25% reduction in energy
use within targeted buildings and a reduction of 911 tonnes of CO2e in building related emissions. 
• North Lanarkshire energy advice service - This service is funded by the UK Shared Prosperity Fund and delivered by the Wise Group’s Home Energy
Advice Team (HEAT) on behalf of the council. The service is available to vulnerable and/or fuel-poor households across North Lanarkshire that require
support to resolve any energy-related issue and struggling to pay their energy bill. Advice and assistance are offered to households such as help reducing
energy consumption as well as energy debt advocacy. This service is due to conclude March 2025. 
• Work has continued and developed with volunteer groups at Greenhead Moss and Palacerigg Country Park, together with 7 Lochs volunteers, in carrying
out practical conservation tasks as well as some path and pond construction projects. These volunteers gain huge benefits in terms of mental and physical
health from being involved in these projects, often they are individuals who have struggled with their mental health and these opportunities provide a
chance to reconnect with society and the environment.
• Funding from the Nature Restoration Fund totalling £556k has been used to deliver a number of projects such as the seeding of native wildflower
meadows in eight town parks and biodiversity enhancements in four cemeteries.
• The New Build team continues to produce quality, energy efficient housing with a record 335 homes delivered meeting minimum EPC B rating and 19 net
zero homes delivered.  This includes commencement on site of the first housing project in North Lanarkshire to use a ground source heat pump system,
zero-emission heating systems installed on several major housing sites, renewable technologies such as PV installed on all council new builds, and a
fabric first approach on all council new build properties which includes enhanced insulation, window and doors standard. 
• Auchinlea Landfill Site - Following a review of Auchinlea Landfill Site a two phase project (surface water management and leachate management)
commenced June 2024. Leachate management refers to water, such as rainfall, which has passed through the solid matter and in this case the solid
matter is landfill which means that both aspects of the project were crucial to the environmental management of the site. Phase 1 has seen the installation Page 19 of 144

Page 20

of a passive surface water drainage system that has eliminated the need of costly diesel pumps. The council will save over £60,000 per annum as a result
of this. The second phase of the project is looking to treat the leachate onsite by creating a lagoon filtration system. Discussions are currently ongoing with
SEPA. Should the project attain the necessary approvals, it will enhance the biodiversity of the site, realise an annual saving of £85,000, and eliminate the
transporting of leachate off site for treatment. 
• The council continues to invest in existing housing stock to ensure that not only is the energy efficiency of properties increased, but also that carbon
emissions are reduced and contribute towards meeting national net zero targets. Overall, 6,000 energy efficiency measures were installed in local homes
in 2023/24, with 462 properties having external wall insulation installed, 600 properties having their windows upgraded to triple-glazed windows, 2,300
homes receiving energy efficient heating, 1,900 homes having solar panels installed, and 689 receiving insulation upgrades. As part of these works,
funding was received from the Scottish Government’s Energy Efficient Scotland: Area Based Scheme, to install external wall insulation to flatted blocks in
Kilsyth and Langloan. The amount invested in these areas is £3.4m, with £1m being funded by the Scottish Government to assist homeowners with the
cost of the works. 
Report title Summary
North Lanarkshire
Community Planning
Partnership: annual
oversight and
outcomes report
2023/24 
February 2025
• The Community Empowerment (Scotland) Act 2015 introduced a range of new requirements on local authorities and community planning
partners to empower and strengthen community involvement in the design, planning, and delivery of local services. 
• The Act requires all public sector bodies to work together and to engage with local communities on the issues that matter the most to them with
the shared aim of improving outcomes in these priorities. There is a particular emphasis on addressing inequalities, poverty, and socio-
economic disadvantage in local areas. Community planning partners must also report publicly on their progress including where outcomes
have been improved through joint planning, collaboration, and effective partnership working - operationally and strategically.
• The annual oversight and outcome report for 2023/24 highlights where community planning in North Lanarkshire is making a positive impact in
strengthening partnership working and improving outcomes in line with The Plan for North Lanarkshire’s shared ambitions.
Aligned Priority:  Enhance participation, capacity, and empowerment across our communities.
Ambition statement: 20.  Improve the involvement of communities in the decisions, and development of services and supports, that affect them.
24.  Review and design services around people, communities, and shared resources.
Consistent All Community Planning Partnerships are required to annually review and report on their progress.
Transparent • The report demonstrates and provides assurance that the North Lanarkshire Community Planning Partnership is meeting the aforementioned statutory
obligations.  
• A detailed summary, attached as an appendix to the report, illustrates where community planning partners are collaborating and working closely with the
community and voluntary sector and local people in the planning, delivery, and resourcing of public services with shared aims to improve outcomes and
reduce inequalities.
In context • The report advises that an integrated programme of reporting activity supports the North Lanarkshire Community Planning Partnership in monitoring the
progress against priorities while fulfilling its statutory reporting obligations. This comprises - consideration of the annual outcomes report by the North
Lanarkshire Partnership (NLP) Strategic Leadership Board and the Communities Committee with publication via the council's website and submission
and consideration of a composite performance report to the NLP Strategic Leadership Board every six months on partnership activity and progress in
taking forward the identified priorities and associated actions across the nine Local Outcome Improvement Plans. 
• It also notes that similar reports are considered by the Communities Committee with publication via the council's website (see next report on the next
page) and that preparation and publication of annual progress reports on delivery of the individual Local Outcome Improvement Plan actions in each area
are consideration by the relevant Community Board.  In addition, it is noted that annual reporting by statutory partnerships and other partnership working
groups on thematic plans are also included, e.g. the Children’s Services Plan and the Tackling Poverty Action Plan.
Balanced Key highlights, described more fully in the appendix accompanying the report include the following:  Page 20 of 144

Page 21

• Continued and enhanced support from partners to families, households, and communities throughout the ongoing cost of living crisis.
• Ongoing commitment from partners to support good mental health, tackling mental health stigma and discrimination.
• The continued commitment across all partners to work collectively and differently in supporting care experienced children, young people and their
families, reaffirming their commitment to The Promise.
Report title Summary
Local Outcome
Improvement Plans
performance report -
April to September
2024 
February 2025
This report provides a snapshot of progress linked to key priorities for each of the nine Local Outcome Improvement Plans (LOIPs) for the period
from 1st April to 30th September 2024. 
The report also provides an overview of progress with implementation of the Management and Monitoring Framework and work to develop the role
of the Local Partnership Teams. 
Aligned Priority:  • Enhance participation, capacity, and empowerment across our communities.
Ambition statement: 19. Improve engagement with communities and develop their capacity to help themselves.
Consistent • The report advises that the LOIP Management and Monitoring Framework has now been in use since June 2022 as a tool for partners to highlight and
report on progress with local action linked to LOIP priorities. The tool also aims to assist with reporting progress and outcomes around LOIP priorities to a
range of audiences including the Community Boards, the Communities Committee, the North Lanarkshire Partnership Strategic Leadership Board, and
individual partnership agency leadership teams as appropriate. 
• The Framework is intended to streamline reporting, ensure consistency, and allow partners to focus on critical issues or significant developments.
• The success of the Management and Monitoring Framework does not rest with one agency or an individual officer. All Local Partnership Team members
share a collective responsibility for ensuring that the Framework is regularly updated and that there is adequate monitoring and scrutiny of progress and
performance at each Local Partnership Team meeting. 
• Local Partnership Teams meet six-weekly with the purpose of ensuring oversight for delivery of LOIP priorities, with priority focused subgroups meeting
as locally agreed and required to ensure targeted partnership action. Local Partnership Teams ensure use of the Management and Monitoring
Framework and continue to refine the approach to reporting on progress to this Communities Committee, the North Lanarkshire Partnership Strategic
Leadership Board, and Community Boards.
Transparent • The report advises that the LOIP Management and Monitoring Framework underpins quarterly reporting to individual Community Boards, six monthly
reporting to Committee, and statutory annual reporting in line with the Framework for Demonstrating Improved Outcomes for Communities. 
• The six monthly performance outcomes, attached in appendices to the report, provide a summary of key highlights across the strategic priorities
identified in each LOIP.  Planned future actions for the forthcoming six months (i.e. October 2024 to March 2025) are also included.
In context • The report sets out the context within which the Management and Monitoring Framework was developed, i.e. in support of the North Lanarkshire
Partnership Strategic Leadership Board’s Framework for Demonstrating Improved Outcomes for Communities, a LOIP Management and Monitoring
Framework was developed and implemented to ensure effective management, oversight, and reporting of progress on LOIP priorities by Community
Planning Partners through the Local Partnership Teams. 
• Local Partnership Teams were established to drive and embed delivery of the LOIPs across the Community Planning Partnership and ensure effective
monitoring and management of progress. 
Balanced • The report is accompanied by nine appendices which set out detailed information for each LOIP in terms of priorities, progress and highlights, and
planned actions and developments; this information is based on input from partner organisations.
• Work has been undertaken with partners to ensure accountability and ownership for delivery of actions, participation in Local Partnership Teams and use Page 21 of 144

Page 22

of the framework to inform monitoring. Examples include: 
• Consultation with Local Partnership Team members and a review of the Management and Monitoring Framework to streamline and improve the
reporting process for LOIP priority leads. This informed amendments to the system implemented from the reporting cycle from 1st April to 30th
September 2024. 
• Self-assessment, planning and review sessions with each of the four Local Partnership Teams during 2024 to inform and identify development
improvement actions for the operation of each individual Team.
• This work builds on previous work with Local Partnership Teams since their inception, including online and in person development sessions for Teams
collectively, with their own areas and around specific themes. Work continues to be developed within the Local Partnership Team model, and the
Framework continues to be improved, reflecting the complexity and some of the challenges associated with partnership working, for example staff
turnover, ongoing community voluntary sector engagement, and partnership ownership and accountability.
• In relation to Community Board chairs and improvement activity, the report advises that the nine Community Board chairs have been brought together
initially as a short-life task group to co-ordinate the approach to reviewing response to the Community Board self-assessment activity that took place in
2023/24. This work included the following:
- Analysis of data from the initial survey - a booklet was produced outlining North Lanarkshire wide improvement actions and matters for local
consideration.
- Arranging localised sessions to consider results for each Board (delivered August /September 2024). 
- Assisting with organising the Community Board conference planned for spring 2025. 
- A report for each of the Boards to agree their own improvement actions at their November/December 2025 meetings to conclude the self-evaluation
work (other than monitoring of progress). 
- The Chairs’ continuing to meet to consider matters relevant to all Boards, share good practice, and explore any challenges collectively and also to
continue to be involved in the organisation of the planned Community Board conference.
Report title Summary
Education
performance report
This report provides an update on North Lanarkshire’s educational performance for 2023/24 across key measures including attainment within the
broad general education (from early learning and childcare to end of S3) measured via Achievement of a Level (ACEL) data, attendance and
exclusion, and teacher numbers and pupil teacher ratio.  The report includes local authority comparison data compiled from national statistics
published in December 2024 (https://www.gov.scot/collections/school-education-statistics/#summarystatisticsforschoolsinscotland).  The report
also provides a summary of HMIe and Care Inspectorate Inspection Outcomes for 2023/24 and, where applicable, outlines impact, progress to
date, and planned next steps. 
Aligned Priority:  • Support all children and young people to realise their full potential.
Ambition statement: 6.  Raise attainment and skills for learning, life, and work to enhance opportunities and choices.
Consistent • Local authorities have a duty to improve standards in education, challenging and supporting educational establishments to ensure continuous
improvement. 
• North Lanarkshire’s quality improvement framework, updated in session 2022/23, empowers school leaders to secure continuous improvement while
providing assurance to stakeholders on the quality of education provided for learners.
Transparent • The report outlines some of the key strategies implemented in 2023/24 to further support the quality improvement framework and facilitate improvement
across North Lanarkshire’s educational establishments. The implementation of this framework is managed by Education and Families Managers.
In context • The report sets the context in respect of attainment within the broad general education highlighting that Scotland’s curriculum, Curriculum for Excellence
(CfE), is divided into two phases - the broad general education (BGE) and the senior phase. 
• The BGE has five levels (Early, First, Second, Third, and Fourth). It begins in early learning and childcare and continues to the end of S3 (the third year of
secondary school). As illustrated in the table below, broadly speaking at the primary stages, progress through a level can take up to three years, although Page 22 of 144

Page 23

the curriculum is designed to allow pupil progress to be accelerated to ensure breadth, depth and challenge, across and within levels. 
Balanced • The report sets out a wide range of figures that show North Lanarkshire’s performance over time as well as a comparison of this with the national average
and family group average of similar councils.  Data is shown in relation to the following:
-  P1, P4, P7 data for literacy and numeracy.  
- Performance within Curriculum for Excellence organisers - this shows attainment data across the literacy and numeracy organisers which is useful to
support the service’s strategic planning in terms of training for staff and deployment of support, for example.
- Combined data for literacy and numeracy, highlighting learners’ attainment at Curriculum for Excellence 3rd and 4th level.
- Cohort comparison in respect of Achievement of a Level (ACEL) data - comparing 2024 to 2021 data allows performance to be tracked in terms of the
progress of the same cohort of pupils who have moved from P1 to P4, P4 to P7, and P7 to S3 over the four year period.
- Progress towards closing the poverty related attainment gap over time.
- Senior phase post appeal data, pupil numbers, teacher numbers and the pupil teacher ratio, and attendance and exclusions.
- HMIe and Care Inspectorate inspection outcomes and the thematic inspection in October 2024.
Report title Summary
Revenues and benefits
update 
February 2025
This report provides a regular update on the payment performance for council tax and non-domestic rates, the administration of a range of welfare
benefits, and the council tax reduction scheme. 
It provides an update on performance as at 31st December 2024.
Aligned Priority:  • Improve North Lanarkshire's resource base.
Ambition statement: 21.  Continue to identify and access opportunities to leverage additional resources to support our ambitions.
Consistent • Produced quarterly, this report provides Elected Members with detailed in-year performance figures which can be compared to the same period in previous
years.
Transparent • The year to date performance set out in the report covers a wide range of service activities as well as the amount of funding paid out to help households in
need in order to provide a safety net for local people on low incomes.
• The report also allows for comparisons of performance with the same period in previous years.
In context • The council is responsible for the administration and collection of all local taxation in North Lanarkshire in the form of council tax and non-domestic rates. 
In addition, the council administers a number of benefits for residents of North Lanarkshire including housing benefit, council tax reduction, Scottish welfare
fund, discretionary housing payment, free school meals, and clothing grants.
• The report includes the latest context within which the service is operating; this is of particular relevance given the aforementioned administration of grants
and support payments required for low income households.  The report also advises of any new national grants when they are introduced, or will cease,
and the qualifying conditions for receipt of such.
Balanced The report provides a high-level summary of the highlights which include: Page 23 of 144

Page 24

• As at 31st December 2024, 81.74% of council tax due for 2024/25 had been collected. This is a marginal percentage point reduction from the same period
last financial year (0.07%).
• Non-domestic rates collection at 31st December is 81.0% of the total annual charge. This is an increase of 16.74% from the same period last financial year. 
• The service continues to meet statutory timescales for administering benefits applications and changes of circumstance.
Report title Summary
Financial monitoring
report - council
summary (revenue) 
February 2025
This report presents the council’s revenue monitoring position for the General Fund Account, Housing Revenue Account, and Adult Health and
Social Care. 
(Note, the Council set its Revenue Budget and Council Tax for 2025/26 and provided a forecast Revenue Budget position for financial years
2026/27 and 2027/28 at the committee meeting in February 2025.)
Aligned Priority:  • Improve North Lanarkshire’s resource base.
Ambition statement: 21. Continue to identify and access opportunities to leverage additional resources to support our ambitions.
25.  Ensure intelligent use of data and information to support fully evidence-based decision making and future planning.
Consistent • The report at each financial period end consolidates the budget monitoring position of all council services into one council summary, highlighting and
explaining major variances as per the council’s approved Financial Regulations.
• The February 2025 report presents the council’s revenue monitoring position for the financial year to 31st March 2025 as at the end of period 10 (03/01/25).
Transparent • The report highlights and explains major variances as per the council’s approved Financial Regulations. The Financial Regulations require services to
remain within their approved budgeting provision, and to report all significant deviations - defined as the higher of £100,000 or 5% - within their budget
monitoring reports.
In context • All activities undertaken by the council are subject to risk, and in acknowledging the council’s approved Risk Management Strategy, services manage
these as part of their overall corporate and service planning processes. The February 2025 report states that the current economic climate and pay and
non-pay inflation, continuing at historically high levels, are some of the key factors that have the potential to impact on the council’s ability to provide quality
services within approved budget levels. 
Balanced • Where significant deviations are identified, services must provide explanatory commentary, outline the action required to rectify such deviations and, where
relevant, must also highlight the impact this has on other budget headings.  This information is captured by Finance and summarised in the overall council
report. 
• A summary by division for the period ending 03/01/25 (P10) is included in an appendix to the report, as is a note of anticipated commitments against
earmarked reserves, and availability of general fund balances. 
Report title Summary
Financial monitoring
report - council
summary (capital) 
February 2025
This report provides an update on the 2024/25 resources and expenditure for the council's Strategic Capital Investment Programme. The report
also shows the 2024/25 projected outturn position and the resultant variances. 
(Note, the Strategic Capital Investment Programme for 2024/25 to 2028/29 was approved by Policy and Strategy Committee in March 2024 and
an annual update was provided in March 2025.) 
Aligned Priority:  • Improve North Lanarkshire’s resource base.
Page 24 of 144

Page 25

Ambition statement: 21. Continue to identify and access opportunities to leverage additional resources to support our ambitions.
25.  Ensure intelligent use of data and information to support fully evidence-based decision making and future planning.
Consistent • The report at each financial period end consolidates the capital monitoring position of all council services into one council summary. 
• The February 2025 report summarises the overall council Strategic Capital Investment Programme for 2024/25 in relation to resources and expenditure
and the 2024/25 projected outturn position and resultant variances. 
Transparent • The report notes that Strategic Capital Investment Programme 2024/25 to 2028/29 was approved at Policy and Strategy Committee in March 2024 with
an annual update provided in March 2025.  It represents the total Community Investment Programme incorporating the General Services Capital
Programme and HRA Capital Programmes. 
• The programme was developed in conjunction with services and led by the Strategic Capital Delivery Group (SCDG) using the principles established by
the council’s Capital Strategy. 
In context • The report states that the General Services Capital Programme supported by General Services resources demonstrates to communities that the place
making vision for towns remains a priority, and that the approved 5-year capital investment plan supports delivery of The Plan for North Lanarkshire.
• The programme includes additional investment in Town and Community Hubs, the City Deal programme, and external grant funding. In addition, the
Housing Revenue Account (HRA) resources support several HRA Capital Investment Programmes including the mainstream programme for investment in
the council’s existing estate and delivery of the ambition for additional supply through the new build and council buyback programmes.
Balanced • The report notes the current financial position in respect of the 2024/25 General Services Capital Programme and the Housing Revenue Account. This
reflects the approved budget and subsequent decisions made at the Strategic Capital Delivery Group (SCDG) in accordance with the SCDG terms of
reference, and where appropriate either by the individual service committees, Finance and Resources Committee, or the Policy and Strategy Committee
)as per the Scheme of Administration).
• A breakdown of the overall 2024/25 budget by service programme and associated approved budget movements is included in an appendix to the report.
• In acknowledging the risks, the report recognises that the capital programme continues to face challenges in relation to the wider economic climate, linked
to availability of materials, contractors, and inflationary pressures. These are currently being managed by services and Project Boards associated with
specific programme delivery and will continue to be monitored throughout the year in accordance with the Strategic Capital Delivery Group (SCDG) Terms
of Reference.
Report title Summary
Financial monitoring -
savings 
February 2025
This report provides an update on the achievement of the three-year financial savings targets and progress.
Aligned Priority:  • Improve North Lanarkshire's resource base.
Ambition statement: 21.  Continue to identify and access opportunities to leverage additional resources to support our ambitions.
Consistent • This regular report ensures ongoing oversight by Elected Members of the Finance and Resources Committee in terms of the progress in implementing
savings.
Transparent • This report provides the Committee with an update on the achievement of the three-year financial savings total of £28.778m approved as part of the
2024/25 budget setting process and advises it is projected that 93% of the 2024/25 savings will be delivered within the financial year, with replacement
savings identified to fully address the shortfall. In addition, it is currently anticipated that there will be no recurring savings gap arising from the 2024/25 to
2026/27 approved savings. Page 25 of 144

Page 26

In context • The report presents the up-to-date savings position within the context of the overall budget position for the council.
Balanced • Each service report sets out the context for savings in that services are required to monitor the delivery of their target savings to ensure they remain within
their approved budgets and provide periodic progress updates within individual service revenue monitoring reports, identifying alternative solutions to any
in-year shortfall envisaged. In addition, services are required to monitor whether the original approved saving has been implemented and if not, provide an
explanation along with alternative action required to ensure the recurring financial saving will be achieved going forward. This information is captured by
Finance and summarised in the overall council report. 
Key to RAG status
green Performance is on target and/or within acceptable thresholds
red Performance does not meet target and is outwith acceptable thresholds
blue Performance surpasses the target and exceeds expectations
Page 26 of 144

Page 27

North Lanarkshire Council
Report
Audit & Scrutiny Panel 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    FS/ASP/ALMay25 Date 08/05/25 
Audit and risk related items: Action log 
From  Francis Scott, Chief Officer (Audit and Risk)  
E-mail scottfr@northlan.gov.uk Telephone 07887 914207 
Francis Scott
Chief Officer (Audit and Risk)
Executive Summary
The purpose of this report is to allow elected members to track implementation of
outstanding requests and recommendations made by the Panel in respect of audit and risk-
related items. 
The attached log (at Appendix 1) records those audit and risk-related requests and
recommendations made by the Panel and when these were addressed and/or are
expected to be addressed.  Any actions that have previously been reported as complete
and noted by the Panel have been removed from the log.
Recommendations
The Panel is invited to note the report.
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Item 3
Page 27 of 144

Page 28

Appendix 1 Audit and Risk related items: Outstanding action log 
Date Requests or agreed action Status
October
2024 1. Request that Internal Audit incorporate a 6 monthly
tracking report of progress in implementing actions
agreed in response to External Audit recommendations.
Complete – the 6-monthly update is incorporated in the Follow-up of
Implementation of Audit Recommendations report, included in this agenda
pack.
September
2023
2. Request a further report be brought back by
management to a future meeting on progress
implementing outstanding actions identified by Internal
Audit follow-up work in relation to the implementation of
quality assurance processes to monitor compliance with
Project Management framework.
Complete – the final audit report for Project Management Quality
Assurance Processes is included in this agenda pack. 
May 2023
3. Request a further report be brought back by
management to a future meeting on outstanding actions
identified by Internal Audit follow-up work in relation to
managing strategic change.
In progress – implementation of this action has been tracked though
Internal Audit’s follow-up procedures. The most recent assessment is that
these management actions are now complete.   
The 2024-25 Internal Audit Plan includes an audit of the Council’s recently
revised governance arrangements for the Programme of Work to 2028. 
Planning for this audit is now underway, but the detailed work will be
carried forward into the 2025-26 annual plan with the results reported to a
future meeting of the Panel.
4. Request a further report be brought back by
management to a future meeting on outstanding actions
identified by Internal Audit follow-up work in relation to
Employee Service Centre – key controls.
In progress – People Resources has now completed a review of the
issues identified and a report has been prepared for presentation to BMT
in May. Once approved by BMT, the action will be marked as complete. 
Further longer-term action is required to address these issues, and this will
be managed and monitored through the People Resources service risk
register. 
Page 28 of 144

Page 29

North Lanarkshire Council
Report
Audit and Scrutiny Panel
Does this report require to be approved? ☐ Yes   ☒ No
Ref    FS/ASP/PRMay25 Date 08/05/25
Internal Audit: Progress Report  
From Francis Scott, Chief Officer (Audit and Risk)
E-mail scottfr@northlan.gov.uk Telephone 07787 914207
Executive Summary
The purpose of this report is to provide an overview of Internal Audit activity and audit
reports issued since the last update to the Panel in February 2025, namely:
• Project Management Quality Assurance
• Performance Management – Community Operations
• Non-Domestic Rates – Reliefs and Refunds
• UK Shared Prosperity Fund
• Business Continuity Planning
• Housing and Corporate Property Maintenance and Improvement Services Contract
This report will also advise on the progress with the 2024-25 Internal Audit plan and provide
an update on performance management.
Recommendations
The Panel is invited to:
(a) note the content of the Internal Audit reports together with the associated management
responses.
(b) consider whether there are any issues raised by Internal Audit which the Panel consider
are sufficiently significant to require a further report from management to be submitted
to a future meeting of the Panel.
(c) request that Internal Audit report to future meetings of the Panel on the progress in
implementing agreed management actions categorised as ‘High’ or ‘Medium’ priority,
and
(d) otherwise note this report.
Item 4
Page 29 of 144

Page 30

1. Background 
1.1 The 2024-25 Internal Audit Plan was approved by the Audit and Scrutiny Panel in May
2024.  The Internal Audit Charter requires that Internal Audit Progress Reports are
presented to each meeting of the Panel, providing an update on the progress against
the Internal Audit Plan and any other Internal Audit activity.  This report fulfils that
requirement. 
2. Report 
Audit reviews completed in the period 
2.1 The audit reports summarised below were included in the 2024-25 Internal Audit Plan
and have been completed since the last meeting of the Panel in February 2025.  While
the reports noted contain recommendations for improvement, all have been assessed
as providing positive levels of assurance.   Management have responded positively to
these reports and satisfactory responses and commitments to audit recommendations
have been received. 
2.2 Appendix 1 provides detailed definitions of the priorities assigned to audit
recommendations, and the factors considered when determining the level of assurance
provided in the audit opinion. Full copies of these audit reports have been included in
the meeting paper in line with the approved reporting protocol. 
Project Management Quality Assurance 
Internal Audit Opinion Reasonable assurance
Recommendations High 0 Medium 1 Low 1 
2.3 The purpose of this audit was to determine the progress with the Council’s approach to
reviewing Services’ compliance with the Council’s Project Management Framework,
and to provide assurance on the adequacy and effectiveness of these
arrangements.  Based on the results of our audit work, we are satisfied that a quality
assurance process, covering the relevant requirements of the Project Management
Framework, has been developed and is operating in line with the Council’s
expectations.  Issues arising from the compliance assessments have been translated
into improvement plans for each Chief Officer and an annual report, outlining the
findings and outcomes of the compliance review, is submitted to the Audit and Scrutiny
Panel.  We have identified one area where we consider there is scope for improvement,
relating to the need to consolidate all aspects of the quality assurance process into a
single formal document. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Page 30 of 144

Page 31

Performance Management – Community Operations 
Internal Audit Opinion Reasonable assurance
Recommendations High 1 Medium 1 Low 0 
2.4 An audit of the Council’s strategic performance management arrangements in 2023-
2024 identified that, while arrangements were generally satisfactory, there was a need
for future audit work to be focussed on compliance within individual Services.  The
purpose of this audit was therefore, to provide assurance on the adequacy and
effectiveness of the performance management and reporting arrangements within
Community Operations.   
2.5 Based on the results of our audit work, we are generally satisfied that the Service has
identified performance indicators (PIs) which are SMART (specific, measurable,
achievable, realistic and timely), all PIs reviewed have an indicator definition sheet and
performance is a standing agenda item at Senior Management Team meetings. 
However, our work identified two areas for improvement relating to: 
• A need to significantly improve compliance with corporate processes and
procedures in relation to the description, calculation and recording of PIs.
• Improvements in the arrangements for reporting performance information to senior
management and elected members. 
Non-Domestic Rates – Reliefs and Refunds 
Internal Audit Opinion Substantial assurance
Recommendations High 0 Medium 0 Low 2 
2.6 This was a high-level review to provide assurance on the adequacy and effectiveness
of the Council’s management arrangements and key controls in relation to reliefs and
refunds of Non-Domestic Rates (NDR). Based on the results of our work, we are
generally satisfied that the control framework and management arrangements in
relation to core NDR processes are adequate and operating effectively, with well
established procedures in place to ensure that changes in statutory regulations are
promptly and accurately updated in the NDR system.  We were pleased to note that
reliefs, discounts and refunds were accurately recorded, correctly calculated,
appropriately authorised and supported by appropriate documentation, with updated
demand notices being issued promptly. 
UK Shared Prosperity Fund 
Internal Audit Opinion Substantial assurance
Recommendations High 0 Medium 0 Low 1 
2.7 This audit focussed on the overall governance arrangements in place to ensure UK
SPF projects are being appropriately progressed in line with Council’s UK SPF
Assurance Framework and that key risks are being effectively managed.  We are
satisfied that the control environment for the UKSPF is operating as intended and that
the Assurance Framework is generally being adhered to.  We were pleased to note that
there is effective governance and oversight which is being provided by the Project
Board and supporting Project Working Group through regular reporting of progress,
risk, finance and outputs and outcomes on individual projects.  Additionally, clear
deliverables, which align with the UKSPF investment priorities and interventions, have
Page 31 of 144

Page 32

been identified for each project with budgets and performance being managed by
project officers. 
Business Continuity Planning  
Internal Audit Opinion Reasonable assurance
Recommendations High 0 Medium 3 Low 1 
2.8 This was a high-level review designed to provide assurance on the adequacy and
effectiveness of actions taken by management in response to previous audit
recommendations in relation to business continuity planning. We were pleased to note
that significant work has been undertaken by the Resilience Planning Unit with regards
to business continuity planning which has resulted in a marked improvement in
documenting business continuity arrangements for individual Services, and we are
generally satisfied that the Council has reviewed and strengthened the control
environment for documenting, reviewing and testing business continuity arrangements. 
2.9 We have identified some areas for improvement, which include:
• Processes around critical activities and workarounds for business continuity
planning need to be strengthened, with guidance reviewed, updated, and
communicated to Services.
• There is merit in Service business continuity arrangements being subject to critical
appraisal and challenge.
• Plans for alignment of business continuity and disaster recovery plans need to be
progressed, finalised and implemented.   
Housing and Corporate Property Maintenance and Improvement Services
Contract 
2.10 In 2024, two significant audit reports relating to housing repairs were issued, namely
“Enterprise Project: Housing and Corporate Procurement” and “Audit Scotland
Whistleblowing Allegations – Mears Housing and Property Maintenance Contract”, and
both reports contained a number of high priority recommendations.  The purpose of this
review was to track the progress of the recommendations made in these reports,
including the robustness of the action taken.   
2.11 Based on the results of our work, we were pleased to note that significant progress has
been made in implementing the recommendations contained in both reports, with some
aspects (including those relating to the Intelligent Client Function, contract
management, performance management and the Mobilisation Plan) where we consider
that interim or essential elements have now been fully implemented.  However, as the
Housing Contract only commenced in July 2024 and is still within the first year of
operation, there remains a number of areas where more advanced and fully established
arrangements have not yet been finalised and require further development to ensure
that they are properly embedded. 
2.12 Further audit work on the ongoing operation of the housing contract has been included
in the Internal Audit Plan for 2025-26. 
Page 32 of 144

Page 33

Performance Management 
2.13 In line with Internal Audit performance management framework, two performance
indicators are subject to quarterly reporting to the Panel.   
2.14 The first indicator is the implementation of agreed actions arising from Internal Audit
reports by the implementation date.  In the period to March 2025, 54% of agreed actions
have been implemented by the implementation date (the previous update for the period
to December 2024 had a 57% completion rate). 
2.15 The second performance indicator measures client satisfaction.  The results received
in the period continue to show positive feedback on the work of Internal Audit, with
100% of respondents agreeing that Internal Audit added value by assisting in providing
assurance, and that reports were relevant and constructive with findings clearly and
accurately communicated.  Appendix 2 provides a summary of the questions we ask
audit clients at the conclusion of each audit. 
3. Measures of success 
3.1  Internal Audit reports annually on its performance to the Panel and is also subject to
review annually by the Council’s appointed external auditors.   
4. Supporting documentation 
Appendix 1 Audit Grading Definitions
Appendix 2 Internal Audit Client Feedback Results 
Francis Scott, Chief Officer (Audit and Risk)  
Page 33 of 144

Page 34

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒  
Page 34 of 144

Page 35

If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Effective responses by management to the weaknesses, control issues and/or areas
of improvement identified by Internal Audit will increase the likelihood of the Council
achieving its ambitions by improving control frameworks and more effectively
mitigating potential risks and threats to the achievement of planned outcomes. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 35 of 144

Page 36

Appendix 1 Audit Grading Definitions 
Audit reports are graded with an overall assurance opinion, and any issues and associated
recommendations are classified individually to denote their relative importance, in accordance with the
definitions in the tables below. 
Definition of audit assurance and recommendation categories
Assurance Confidence based on sufficient evidence that internal controls are in place, operating
effectively and objectives are being achieved. 
Assurance opinion
Substantial
Assurance
There are minimal or minor control weaknesses that present low risk to the control
environment.  The control environment has substantially operated as intended although
some minor errors have been detected. Very few or no improvements are needed.
Reasonable
Assurance
There are some control weaknesses that present a low to medium risk to the control
environment.  The control environment has mainly operated as intended although errors
have been detected.  Some improvements should be made.
Limited
Assurance
There are significant control weaknesses that present medium to high risk to the control
environment.  The control environment has not operated as intended.  Significant errors
have been detected.  Substantial improvements should be made.
No Assurance
There are fundamental control weaknesses that present an unacceptable level of risk
to the control environment.  The control environment has fundamentally broken down
and is open to significant error or abuse.  Immediate and major changes need to be
made. 
Organisational impact
Major The weaknesses identified during the review have left the Council open to significant
risk.  If the risk materialises it would have a major impact upon the organisation.
Moderate The weaknesses identified during the review have left the Council open to medium risk. 
If the risk materialises it would have a moderate impact upon the organisation.
Minor The weaknesses identified during the review have left the Council open to low risk.  If
the risk materialises it would have a minor impact upon the organisation. 
Recommendation priority
High
Significant control failure or weakness that, if not addressed, may lead to a major
financial, operational or reputational risk to the organisation and/or significantly impact
the successful delivery and achievement of the objectives of the area under review. 
Urgent/Immediate action is required.
Medium
Control failure or weakness that, if not addressed, may lead to a moderate financial,
operational or reputational risk to the organisation.  Weakness may be individually
significant, but it is unlikely to affect the successful delivery and achievement of the
overall objectives of the area under review.  The risk of error would, however, be
significantly reduced if corrective action were taken.  Prompt action is required
Low
Control failure or weakness that may lead to a minor financial, operational or reputational
risk to the organisation.  Weakness does not appear to significantly affect the ability to
meet objectives.  Minor issue raised to improve the efficiency and effectiveness of
controls. 
Page 36 of 144

Page 37

Appendix 2 Internal Audit Client Feedback Results 
Responses received in this period from 13 clients related to assignments reported to the Panel
(note these responses primarily relate to audit assignments reported in the Internal Audit
Progress Reports presented to the August and October 2024 and February and May 2025
meetings of the Panel). 
Question
Strongly
Agree or
Agree (%)
Neither
Agree nor
Disagree (%)
1. Internal Audit added value to my area by assisting in
providing assurance and/or identifying weaknesses and/or
improvements in relevant governance/business process
and internal controls
100% 0%
2. Internal Audit findings were accurate and clearly
communicated 100% 0%
3. The audit report made relevant, constructive and practical
recommendations to help improve operations 100% 0%
4. Internal Audit staff were professional and courteous
throughout the audit process
93% 7% 
Where management raise concerns over Internal Audit’s work, these matters are discussed
with relevant senior management to fully understand the nature of any concerns and, where it
is considered appropriate, to identify areas for improvement.  We also seek Services’ views on
what they liked or disliked about the audit process and comments received are used to inform
future action plans for improving the service provided by Internal Audit.
Page 37 of 144

Page 38

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit
Reports.docx 1 
INTERNAL AUDIT REPORT 
PROJECT MANAGEMENT QUALITY ASSURANCE 
Headlines
The purpose of this audit was to determine the progress made in developing and implementing the Council’s
approach to reviewing Services’ compliance with the Council’s Project Management Framework, and to provide
assurance on the adequacy and effectiveness of these arrangements.
The refreshed Project Management Framework was launched in December 2022 to ensure that investment is
well-directed, delivered to time, cost and quality targets, and provides the expected benefits and improved
outcomes locally.  Quality assurance arrangements for compliance with the Project Management Framework
were approved by the Corporate Management Team (CMT) in October 2023, and an update on the
implementation and outputs from the quality assurance process was reported to the Business Management
Team (BMT) in March 2024. The quality assurance arrangements are still being developed and a baseline
review, in the form of a self-assessment completed by each Project Manager, has been undertaken for all live
projects as at September 2023 (with the exception of the new supply programme, housing property and
corporate assets/hubs where only a sample were assessed), followed by a quality assurance compliance
assessment.  The outcome of this assessment and the extent of any further assurance work is determined on
an individual project basis.   Whilst good progress has been made, there are some aspects of the proposed
quality assurance framework which have not yet been fully implemented (e.g. check-in and deep dive reviews)
and therefore, still require to be embedded into the process.
Based on the results of our audit work, we have categorised this audit as offering reasonable assurance. We
are satisfied that a quality assurance process covering the relevant requirements of the Project Management
Framework, has been developed and is operating in line with the Council’s expectations.  Issues arising from
the compliance assessments have been translated into improvement plans for each Chief Officer and an annual
report, outlining the findings and outcomes of the compliance review, is submitted to the Audit and Scrutiny
Panel.
We have, however, identified one area where we consider there is scope for improvement, relating to the need
to consolidate all aspects of the quality assurance process into a single formal document. 
Internal Audit Opinion Reasonable assurance 
Priority of Recommendations
High Medium Low
0 1 1 
Organisational Impact Minor 
Report status FINAL Audit ref 0900/2025/004 Date issued 27/03/25
Audit Team Euan Campbell and Lesley Armstrong
Issued To Chief Officer (Strategy and Engagement)
Copied To Business Strategy Manager, Strategy and Performance Manager, Chief Executive
and Deputy Chief Executive 
Page 38 of 144

Page 39

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit
Reports.docx 2
1.  Executive Summary 
Objectives
This review sought to answer the following questions:
• Has the Council developed a quality assurance process to assess the extent to which Services/projects are
complying with the Project Management Framework, and does it cover all relevant aspects of the
Framework?
• Are these quality assurance arrangements being operated in line with expectations? 
• Is there clear evidence that Service/project management takes timely and appropriate action where quality
assurance arrangements highlight areas of potential concern? 
• Is there periodic reporting to key stakeholders on the results of the Council’s quality assurance and
continuous improvement activities and their impact on expected outcomes? 
This engagement has been conducted in accordance with the Public Sector Internal Audit Standards.  The
Internal Audit section reports formally on conformance with these standards to the Audit and Scrutiny Panel.
We would like to thank officers involved in this audit for their co-operation and assistance. 
2.  Findings and Recommendations 
Good practice identified
We noted the following areas of good practice during the audit:
• Quality assurance arrangements for assessing compliance with the Council’s Project Management
Framework have been established and approved by the CMT.
• A self-assessment questionnaire, which aligns with the lifecycle of a project, is completed by the Project
Manager to establish baseline information.  There is a requirement to submit mandatory project
documentation to demonstrate compliance with the Project Management Framework and support the
answers provided in the self-assessment. 
• The Strategy and Performance team undertake a review on the self-assessment submissions and allocate
a status dependent upon the level of compliance with the Project Management Framework.
• Areas for improvement have been identified and translated into Chief Officer improvement plans.
• An annual report is presented to the Audit and Scrutiny Panel to provide them with the relevant assurances
in respect of independent reviews on Services’ compliance with the Project Management Framework.   
Key areas requiring management action (High Priority)
No areas requiring urgent management action were identified. 
Other areas for improvement (Medium Priority)
One other area for improvement was identified: 
• There is a need to consolidate all aspects of the Council’s quality assurance process for assessing
compliance with the Project Management Framework into a single formal document. 
Page 39 of 144

Page 40

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit Reports.docx 3
3. Action Plan Project Management Quality Assurance  0900/2025/004 
Ref Finding
1 There is a need to consolidate all aspects of the Council’s quality assurance process for assessing compliance with the Project
Management Framework into a single formal document.  
Reports presented to CMT in October 2023 and BMT in March 2024 provided an overview of the quality assurance arrangements for assessing compliance with the Project
Management Framework, including an outline of the four types of reviews that support the process, the self-assessment process to establish the baseline review and coverage
of projects within each Service for the initial baseline review.  Whilst this provides a good basis for outlining the quality assurance process, we consider that the existing detailed
arrangements and expected practices should be consolidated into a single formal document and further expanded to include other areas of the process, including:
• Once new projects have been identified by Services and included on project registers, how these will be considered for inclusion in the quality assurance process and the
requirement to undertake baseline reviews.
• A mechanism to track the ongoing status of projects to facilitate identification of the next quality assurance processes required, as appropriate.
• The process for undertaking compliance assessments on baseline reviews, including the criteria used for assessing and allocating a RAG status.
• More detailed information on the purpose and content of check-in, deep dive and senior management reviews, how the need for these reviews will be determined and how
the rationale for such decisions will be recorded.
• The process for identification of potential areas of concern for inclusion in improvement plans and for tracking progress against the actions contained in these plans. 
• The arrangements for reporting the outcome of the quality assurance process to senior management and elected members.
• A description of any lessons learned process established to ensure continuous improvement.
Consideration should also be given as to whether, and to what extent, checks will be undertaken on assessing the quality of the documentation provided to support the baseline
self-assessment.
Implication Recommendation Priority Management response Implementation
Date
Without clear procedures/
guidance, staff may not be fully
aware of expected practices, and
the quality assurance process
and associated principles may
not be applied consistently
across Chief Officers’ remits and
individual projects.  
The Chief Officer (Business and Digital) should ensure
that the existing detailed quality assurance
arrangements and expected practices for assessing
compliance with the Project Management Framework
are consolidated into a single formal document and
expanded to include other areas of the process as
outlined in the finding above. 
Medium
Agree
Stephen Penman, Chief Officer (Strategy and
Engagement)
Processes already in place will be consolidated into a
single document to further support the council’s
approach and rolling review programme to ensuring
ongoing oversight, evaluation, and scrutiny in terms of
quality assurance in line with the Project Management
Framework and in relation to the governance and
delivery of council projects on Chief Officer registers.
Work is already underway in respect of lessons learned
as this approach requires to be wider than the quality
assurance arrangements in order to capture lessons
learned in respect of delivery of projects in line with
each project’s life cycle, as set out in the council’s
Project Management Framework. 
December 2025 
April 2026
Page 40 of 144

Page 41

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit Reports.docx 4 
3. Action Plan (continued) Project Management Quality Assurance 0900/2025/004 
Ref Finding
2 The process for monitoring and tracking improvement actions needs to be fully implemented. 
The findings and issues arising from the baseline reviews of individual projects have been translated into high-level improvement actions, with an improvement plan prepared for
each Chief Officer.  We were advised by the Strategy and Performance team that these action plans have been established and have either been agreed, or are in the process
of being agreed.  We understand that the intention is that the Strategy and Performance team will track these improvement plans and discuss progress with Chief Officers on a
quarterly basis, updating the status of individual improvement actions as appropriate.
From our review of the improvement plans, we were pleased to note that they contained sufficient information to facilitate proper monitoring of the improvement actions, including
responsible lead officers, target completion dates, measures of success and outcomes.  The plans also include a column for monitoring progress.  We consider, however, that
the improvement plans could be further enhanced by including a column stating the progress of each action and recording the ‘as at’ status date to clearly indicate when the plan
was last updated.
Implication Recommendation Priority Management response Implementation
Date
If improvement plans are not
appropriately tracked and
monitored, it may be difficult to
clearly demonstrate progress
and improvement which could
have an adverse effect on
compliance with the Project
Management Framework.
The Chief Officer (Business and Digital) should ensure
that:
• all improvement plans are appropriately and
regularly tracked and monitored, in line with the
rolling review programme; and
• improvement plans are updated to include the ‘as
at’ status date to indicate when they were last
updated and a column stating the progress of each
action. 
Low
Agree
Stephen Penman, Chief Officer (Strategy and
Engagement)
Chief Officer improvement plans have been
established and the implementation of these is
underway through day-to-day business as usual
arrangements that are already in place to maintain,
track, and monitor these plans on an ongoing basis.  As
the review programme for the quality assurance
arrangements is a rolling programme, the ensuing
improvement plans will remain as live plans that are
reviewed and updated on a regular basis.
While these plans are already established with
improvement actions in the process of being
implemented and monitoring underway, the date of
December 2025 has been applied to this audit
recommendation to allow for an annual check in to
ensure the improvement plans and supporting
monitoring processes remain fit for purpose.
The improvement plans have been updated to include
the “as at” status date as well as a “status column” as
noted in the recommendation. 
December 2025 
Complete 
Page 41 of 144

Page 42

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May
Panel/May ASP Final Audit Reports.docx
5
INTERNAL AUDIT REPORT 
PERFORMANCE MANAGEMENT – COMMUNITY OPERATIONS 
Headlines
The Council’s strategic performance management arrangements were reviewed during 2023-2024, with the
audit report concluding that the arrangements were generally satisfactory, with regular and meaningful reports
being submitted to Committee in line with the performance reporting schedule.  The report recognised,
however, a need for future audit work on performance, focussing on the arrangements within individual
Services to determine the level of compliance with corporate processes and procedures and understanding of
performance requirements.
The purpose of this audit was therefore, to provide assurance on the adequacy and effectiveness of the
arrangements within one Service, Community Operations, for ensuring compliance with the Council’s
performance management and performance reporting processes and procedures.
Based on the results of our audit work, we have assessed this audit as offering reasonable assurance. We
are generally satisfied that the Service has identified performance indicators (PIs) which are SMART (specific,
measurable, achievable, realistic and timely), all PIs reviewed have an indicator definition sheet and
performance is a standing item at Senior Management Team (SMT) meetings.  We have, however, identified
some areas for improvement, which are detailed at Section 3 of this report and include:
• There is a need to significantly improve compliance with corporate processes and procedures in relation
to the description, calculation and recording of PIs. 
• Arrangements for reporting performance information to senior management and elected members could
be improved. 
Internal Audit Opinion Reasonable assurance 
Priority of Recommendations
High Medium Low
1 1 0 
Organisational Impact Moderate 
Report status FINAL Audit ref 0800/2025/001 Date issued 31/03/25
Audit Team Jacquie Howden and Lesley Armstrong
Issued To Chief Officer (Community Operations) and Service Delivery Manager (Performance
and Compliance)
Copied To Chief Executive and Deputy Chief Executive 
Page 42 of 144

Page 43

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May
Panel/May ASP Final Audit Reports.docx
6
1.  Executive Summary 
Objectives
This review sought to answer the following questions:
• Is reported data accurately described, reporting what it purports to and consistently, accurately and robustly
calculated?
• Has performance data been accurately and timely reported to senior management and elected members
and do reports highlight areas of good performance and/or areas requiring improvement, together with any
remedial action required to bring performance back on track?
Work undertaken involved discussions with relevant staff as well as substantive testing on a sample of 10 PIs
selected from the Strategic Performance Framework (SPF), which fall within the remit of the Chief Officer
(Community Operations) (see Appendix 2 for details of the indicators reviewed).
This engagement has been conducted in accordance with the Public Sector Internal Audit Standards.  The
Internal Audit section reports formally on conformance with these standards to the Audit and Scrutiny Panel.
We would like to thank officers involved in this audit for their cooperation and assistance. 
2.  Findings and Recommendations 
Good practice identified
We noted the following areas of good practice during the audit:
• The Service’s PIs are generally SMART (specific, measurable, achievable, relevant and timely).
• In line with corporate processes, all PIs reviewed have a performance definition sheet and nominated
Calculating Officer and Verification Officer.
• Performance is a standing agenda item at Senior Management Team (SMT) meetings and discussions
revolve around indicators with a ‘red’ RAG status (i.e. not meeting targets). 
Key areas requiring management action (High Priority)
One key area requiring urgent management action was identified:
• There is a need to significantly improve compliance with corporate processes and procedures in relation to
the description, calculation and recording of PIs. 
Other areas for improvement (Medium Priority)
One other area for improvement was identified:
• Arrangements for reporting performance information to senior management and elected members could
be improved. 
Page 43 of 144

Page 44

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit Reports.docx 7
4. Action Plan Performance Management – Community Operations  0800/2025/001 
Ref Finding
1 There is a need to significantly improve compliance with corporate processes and procedures in relation to the description, calculation
and recording of PIs. 
As part of the Council’s corporate performance arrangements, there is a requirement for Services to nominate a Calculating Officer and a Verification Officer for each PI.  These
officers are responsible for ensuring that all PIs have a fully completed and comprehensive PI definition sheet; are SMART (i.e. specific, measurable, achievable, realistic and
timely); have been subject to the year-end verification process; and have been calculated accurately in line with the description and supporting documentation.
We selected a sample of 10 PIs for Community Operations (see Appendix 2) and reviewed the indicator definition sheets, source documentation and methodology used to ensure
that the reported indicators were accurately described and had been consistently, accurately and robustly calculated.  For the sample reviewed, we identified a number of areas
where we consider that there is scope for improvement:
• Indicator definition sheets not being fully or comprehensively completed in line with the corporate guidelines (with some sections being omitted or not containing sufficiently
detailed information), not clearly stating the required information for the indicator (including how the indicator is measured, data sources and worked examples) and/or not
being signed as reviewed by the Verification Officer.
• A lack of documented procedures detailing how PIs should be calculated and thereafter reported.
• Indicators not being consistently and accurately calculated and reported in line with the indicator description, definition sheet and supporting documentation.
• Delays in updating the performance spreadsheet to reflect the latest quarterly and/or annual performance figures, with the quarterly figures for some indicators not having
been updated for the current year.
• Year-end forms not being completed and/or signed by both the Calculating Officer and Verification Officer.
• Targets and tolerances not being reviewed on a regular basis, despite the indicators not achieving the related targets for a number of years.
• Calculating Officers, who despite having prepared PIs for several years and having access to the corporate year-end guidance, advising that they are unaware of their role
and responsibilities.
Implication Recommendation Priority Management response Implementation
Date
A lack of properly detailed guidance
for individual PIs could lead to
indicators being measured
inconsistently each period, making it
difficult to determine whether
performance has improved or
worsened.
If Calculating Officers and Verification
Officers are not fully aware of their
responsibilities, performance
information may be of poor quality
and/or not prepared or reported on a
timely basis.
The Chief Officer (Community Operations) should:
(1) Undertake a review of all of the Service’s PIs within the SPF to
determine whether the corporate processes and procedures
are being fully complied with and each indicator is accurately
described, consistently and robustly calculated and accurately
recorded.  In particular, the review should consider the issues
identified in the finding above.
(2) Ensure that all individuals assigned the role of Calculating
Officer or Verification Officer are made aware of their
responsibilities in relation to the reporting of PIs, both
throughout the year and at the year-end.
High
Agree
Lynn Oneil, Service Delivery Manager
(Performance & Compliance) 
(1) A full review will be undertaken of
all the Services PIs to ensure all
corporate processes are being
fully complied with.
(2) All Calculating/ Verification
Officers will be provided with a
guidance note to reiterate their
responsibilities in relation to the
reporting of PIs throughout the
year and year end. 
December 2025 
July 2025  
Page 44 of 144

Page 45

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit Reports.docx 8
4. Action Plan (continued) Performance Management – Community Operations 0800/2025/001 
Ref Finding
2 Arrangements for reporting performance information to senior management and elected members could be improved.
The SPF is supported by an annual Performance Reporting Schedule, which was last approved by the Corporate Management Team (CMT) in February 2024 and sets out the
requirement for Chief Officers to report their performance portfolios to the relevant Service Committee on a six-monthly basis (or annually for annual indicators).  Despite the PIs
for Community Operations being both quarterly and annual, the latest performance report to the Environmental and Climate Committee was in May 2024, which provided an
update on the annual position for 2023/24.  In line with the reporting schedule, we would have expected a further performance report to have been presented to Committee in
cycle 4 of 2024, however, this did not happen.  
Our review included PIs relating to Active and Creative Communities (ACC), which was previously part of CultureNL but was brought back into the Council in March 2021 as part
of Education and Families and thereafter transferred to Community Operations in January 2024.  We noted that no reports in relation to performance of ACC have been submitted
to Committee since returning to the Council in March 2021. We were advised that the delays in reporting performance to Committee were initially due to the Chief Officer
(Education South) planning to make changes to some of the reported PIs and thereafter, due to the sensitivities around Committee reports on the potential closures of facilities
and the move of the function to Community Operations.  We were advised that Community Operations has now committed to producing performance reports to Committee in line
with the reporting schedule and is working with Strategy and Performance to achieve this. 
From our review of the minutes for the Community Operations Senior Management Team (SMT), we noted that performance is a standing item on the agenda and that PIs which
have been allocated a ‘red’ RAG status (i.e. not meeting targets) are routinely discussed.  However, given that the performance spreadsheets were not always up to date and
there is no separate report prepared which details the latest figures for all PIs for the Service, there is no clear basis for senior management to determine which indicators require
to be discussed at these meetings.  Discussions, therefore, rely on senior officers highlighting indicators which fall into this category.
Implication Recommendation Priority Management response Implementation
Date
Elected members and senior
management may not be made aware
of current performance levels and
therefore, may be unable to make
decisions and/or take appropriate
action to address areas of
underperformance in a timely manner. 
The Chief Officer (Community Operations) should ensure that:
(1) All PIs included in the SPF are presented to the relevant Service
Committees in accordance with the Performance Reporting
Schedule.
(2) Arrangements are put in place to clearly identify any PIs with a
‘red’ RAG status prior to each SMT meeting to ensure that they
are discussed at the meeting.  This may involve ensuring that
the performance spreadsheet is up to date and issued to all
officers prior to the meeting, thus enabling it to be used as the
basis for discussion.
Medium
Agree
Lyall Rennie, Chief Officer
(Community Operations)
(1) The Service will ensure all PIs
included in the SPF are presented
to the relevant service committee
in line with the reporting schedule.
(2) The performance spreadsheet will
be issued to each of the senior
managers prior to SMT meetings
to allow time to review and will be
used to facilitate discussions on
performance at these meetings. 
July 2025 
Page 45 of 144

Page 46

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit
Reports.docx 9
Appendix 2 – Performance Indicators Reviewed 
Sample Service Area Indicator
1 Protective Services Pest control requests – high priority - % of visits made within 2 working
days 
2 Protective Services Trading Standards – number of outcomes which have safeguarded the
health and wellbeing of consumers (see note 1)
3 Protective Services Private Sector housing regulation and enforcement - % responses to
requests for assistance or advice within 5 working days of receipt 
4 Roads and Assets Roads network - % of all roads that should be considered for
maintenance treatment
5 Greenspace and
Country Parks Country Parks - % operating expenditure met from income
6 Fleet NLC fleet vehicles - % presented for plating/MOT pass first time (new
indicator for 2024/25)
7 Active and Creative
Communities Library services – number of users as a percentage of the population
8 Active and Creative
Communities
Museums – number of people engaging in museum learning
experiences
9 Active and Creative
Communities Community Arts – number of customers engaging in activities
10 Active and Creative
Communities Events – number of attendances at council venues
Note 1 – this performance indicator is currently being piloted and has therefore not yet been agreed and
implemented. 
Page 46 of 144

Page 47

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit
Reports.docx 10 
INTERNAL AUDIT REPORT 
NON-DOMESTIC RATES – RELIEFS AND REFUNDS 
Headlines
This was a high-level review to provide assurance on the adequacy and effectiveness of the Council’s
management arrangements and key controls in relation to reliefs and refunds of Non-Domestic Rates (NDR). 
NDR is a tax on the occupation of non-domestic property, lands and heritage entered onto the valuation roll by
the local Assessor, who determines the rateable value for each property.  The basic rates charge, which is set
by the Scottish Government, is calculated by multiplying the rates poundage by the rateable value. Ratepayers
can apply for an exemption or relief on their NDR liability and Scottish legislation outlines the requirements for
applying these to NDR accounts.
Based on the results of our work, we have categorised this audit as offering substantial assurance.  We are
generally satisfied that the control framework and management arrangements in relation to core NDR
processes are adequate and operating effectively, with well established procedures in place to ensure that
changes in statutory regulations are promptly and accurately updated in the NDR system.  We were pleased
to note that reliefs, discounts and refunds were accurately recorded, correctly calculated, appropriately
authorised and supported by appropriate documentation, with updated demand notices being issued promptly.
Some minor areas for improvement have been identified for management consideration and these are detailed
in the action plan at section 3 of this report. 
Internal Audit Opinion Substantial assurance 
Priority of Recommendations
High Medium Low
0 0 2 
Organisational Impact Minor 
Report status FINAL Audit ref 0200/2025/002 Date issued 31/03/25
Audit Team Elaine MacDonald and Lesley Armstrong 
Issued To Chief Officer (Finance) and Business Finance Manager (Resources)
Copied To Chief Executive and Deputy Chief Executive  
Page 47 of 144

Page 48

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit
Reports.docx 11
1.  Executive Summary 
Objectives
The audit sought to answer the following questions:
• Has there been any legislative changes since the previous audit in 2021-22 and have these been
appropriately applied and operating effectively?
• Have reliefs/discounts applied to individual accounts been properly assessed, calculated and processed,
and has the ratepayer been promptly notified of any changes to liability?
• Are there appropriate controls in place to ensure that refunds are correctly calculated, properly recorded,
appropriately authorised and only processed on accounts with credit balances?
Our review included both compliance testing on key controls and system parameters as well as substantive
testing on a sample of reliefs awarded and refunds paid during the period April to October 2024. 
This engagement has been conducted in accordance with the Public Sector Internal Audit Standards.  The
Internal Audit section reports formally on conformance with these standards to the Audit and Scrutiny Panel.
We would like to thank officers involved in this audit for their cooperation and assistance. 
2.  Findings and Recommendations 
Good practice identified
We noted the following areas of good practice during the audit:
• There are well established processes in place for ensuring that changes in statutory requirements are
accurately and timely updated in the NDR system.
• Access to amend NDR system parameters is appropriately restricted to authorised staff within the Business
Development and Performance (BDP) team and the Revenues team.  
• Reliefs and exemptions are supported by completed applications and evidence of eligibility, where
applicable, and are processed in line with legislation/rates set by the Scottish Government.
• Second officer checks are undertaken monthly on a random sample of changes made to liability, payment
methods and general mail items to ensure that the action taken is appropriate and is supported by sufficient
documentary evidence. 
• The BDP team have a rolling programme for reviewing reliefs and exemptions at least every three years
to ensure ratepayers’ continued entitlement to the relief/exemption.  Failure to return completed review
forms results in prompt cancellation of the relief/exemption.
• All ratepayer accounts marked as being due a refund are independently checked to ensure that they are
accurate and properly due, prior to being passed to the Creditors team for processing.  Details of the refund
feeder are notified to the Creditors team by an authorised signatory. 
Key areas requiring management action (High Priority)
No areas requiring urgent management action have been identified. 
Other areas for improvement (Medium Priority)
No other areas for improvement have been identified. 
Page 48 of 144

Page 49

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit Reports.docx 
12
5. Action Plan Non-Domestic Rates – Reliefs and Refunds  0200/2025/002 
Ref Finding
1 Arrangements for second officer checks should be reviewed to enhance their effectiveness.
Monthly second officer checks are undertaken on a random sample of 40 items of correspondence selected from Workflow to ensure that action taken is appropriate and supported
by sufficient documentary evidence.  Details of the account reference, processing officer, date processed and type of correspondence, together with the outcome of the checks,
any errors and the action taken are recorded on the NDR Audit spreadsheet.  Our review of this spreadsheet confirmed that it is generally fully completed and indicates a high
level of processing accuracy, with errors only occasionally identified.  However, we noted a small number of areas for improvement as follows:
• Second officer checks are undertaken by a single officer, however, despite this officer undertaking some processing activities, no independent checks are undertaken on
their work. 
• There were some instances where the ‘action taken’ narrative did not always provide sufficient information on the issue arising, action taken and/or whether the issue had
been resolved.
Implication Recommendation Priority Management response Implementation
Date
Reliefs/exemptions may be
applied to ratepayers’
accounts at the incorrect
rate, for the incorrect period
or in error, which could
result in the charge due for
payment being incorrectly
calculated.
The Chief Officer (Finance) should consider:
(1) Whether independent checks should be undertaken on a
sample of activities processed by the officer who
generally undertakes second officer checks and
thereafter, build such checks into the checking process.
(2) Reviewing and updating the spreadsheet for recording
second officer checks to provide more detailed
information on issues arising, action taken and whether
the issue identified has been resolved.
Low
Agree
Paula Hendry, Business Finance Manager
(Resources, Revenues and Benefits)
(1) The officer assigned to undertake second officer
checks works part-time and predominantly
undertakes this task across the various
Revenues workstreams rather than a processing
one.  However, as there are occasions when this
officer may be involved in processing, a report
from Workflow will be run each quarter to
determine the level of processing activity and if
sufficient activity is recorded, a Team Leader will
undertake a 10% random sample check.  Details
of checks and outcome will be recorded on a
spreadsheet.
(2) The spreadsheet for recording second officer
checks has been reviewed and updated to
include additional columns to more clearly record
the issue arising, action taken and outcome. 
June 2025 
March 2025 
Page 49 of 144

Page 50

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit Reports.docx 
13
3. Action Plan (continued) Non-Domestic Rates – Reliefs and Refunds  0200/2025/002 
Ref Finding
2 A small number of issues and/or areas for improvement in respect of reviews of reliefs/exemptions and refunds were identified.
The Service processes applications for reliefs and exemptions to ratepayers’ accounts in line with legislation and is responsible for undertaking reviews of these reliefs and
exemptions to ensure that they remain valid.  The BDP team are responsible for initiating reviews of reliefs/exemptions and has a rolling programme in place to ensure that these
reviews are undertaken periodically, and that where no response is received, first reminders are issued four weeks after the review form and cancellation reminders are issued
after a further four weeks. 
From our review of a sample of reliefs and exemptions, we noted that reminders are not always issued timeously in line with the timetable, with some reminders not being issued
until between 31 and 54 days after the initial review form/first reminder.  We also noted that ratepayers in receipt of only mandatory charity relief were not included in the most
recent review of mandatory relief.  We were advised that this was an oversight as the review for mandatory and discretionary relief had been undertaken as a single exercise and
ratepayers with only mandatory relief had been omitted.  The Service has confirmed that this only included four NDR accounts and that review forms have now been issued to
the appropriate ratepayers.
The Service also issues refunds on ratepayers’ accounts where there is a credit balance.  All refunds are paid through the Creditors system (efinancials) and therefore require to
be allocated to a creditors’ reference to enable payment.  Our review of a sample of refunds identified one refund (£116.65) where, despite receiving a written instruction from
the company acting on behalf of the ratepayer, providing the bank details to which the refund should be paid, the payment was made by cheque and allocated to the incorrect
creditors reference.  Although the cheque was made in the name of the ratepayer, it was sent to the wrong address, which was for a previous rates agent.  We were informed by
the Revenues team that this was an error on their part and that the cheque was not cashed and is in the process of being cancelled, with a new refund being raised.
Implication Recommendation Priority Management response Implementation
Date
Reliefs/exemptions may continue to
be applied to ratepayers’ accounts
when they are no longer entitled,
which could result in the charge due
for payment being incorrectly
calculated.
Refunds may be paid to the wrong
ratepayer and it may be difficult to
recoup any such monies paid in error.
The Chief Officer (Finance) should: 
(1) Review the process and rolling programme for
undertaking reviews of reliefs/exemptions to:
• determine whether the current period for issuing
reminders is appropriate and thereafter, ensure
that reminders are issued timeously, in line with
the review programme; and
• ensure that all ratepayers’ accounts in receipt of
a relief/ exemption are subject to a review on a
periodic basis. 
(2) Remind staff within the Revenues team of the
importance of ensuring that, prior to processing
refunds, the correct creditors reference and bank
account details, in line with the ratepayer’s request,
are selected for payment. 
Low
Agree
Paula Hendry, Business Finance Manager
(Resources, Revenues and Benefits)
(1) The Revenues and BDP Teams have
undertaken a review of the process and
rolling programme for undertaking
reviews and concluded that the current
period for issuing reminders will remain at
4 weeks.  Staff have been reminded of the
importance of adhering to the timetable. 
To ensure all relevant accounts are
subject to review, the process has been
amended to incorporate a check, by the
Team Leader, that all scheduled reviews
have been issued.
(2) Staff have been reminded of the
importance of ensuring the correct
creditor reference and refund method is
selected when requesting a refund. 
April 2025 
Page 50 of 144

Page 51

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit Reports.docx 
14 
INTERNAL AUDIT REPORT 
UK SHARED PROSPERITY FUND (UKSPF) 
Headlines
The purpose of this audit was to provide assurance on the adequacy and effectiveness of the Council’s
governance arrangements for the UKSPF to ensure that projects funded by the UKSPF are being appropriately
progressed, that key risks are being effectively managed and that key elements of the Council’s UKSPF
Assurance Framework are being adhered to.
The UKSPF is funded by the UK Government and provided £2.6billion of capital and revenue funding across
the UK for local investment from April 2022 to March 2025. As part of this funding, the eight Member Authorities
of the Glasgow City Region (GCR) City Deal received a combined allocation of £73.9m, with around £13.9m
allocated to North Lanarkshire Council.  Funding has been continued into a fourth year to March 2026, and
from this North Lanarkshire Council received an additional £6million.
Lead authorities were required to develop an Investment Plan setting out how they intended to use the funding
over the three-year period and the Council’s investment priorities, interventions, outputs and outcomes were
submitted as part of the GCR Investment Plan.  As GCR have overall responsibility for the programme, they
developed an agreement for each of the member authorities setting out the terms of the funding arrangement
and including an assurance framework for managing and delivering the Investment Plan.
Based on the results of our work, we have categorised this audit as offering substantial assurance.  We are
satisfied that the control environment for the UKSPF is operating as intended and that the Assurance
Framework is generally being adhered to.  We were pleased to note that there is effective governance and
oversight which is being provided by the Project Board and supporting Project Working Group through regular
reporting of progress, risk, finance and outputs and outcomes on individual projects.  Additionally, clear
deliverables, which align with the UKSPF investment priorities and interventions, have been identified for each
project with budgets and performance being managed by project officers.   
Some minor areas for improvement have been identified for management consideration and these are outlined
in the action plan at Section 3. 
Internal Audit Opinion Substantial assurance 
Priority of Recommendations
High Medium Low
0 0 1 
Organisational Impact Minor 
Report status FINAL Audit ref 0750/2025/002 Date issued 24/04/25
Audit Team Elaine MacDonald and Lesley Armstrong 
Issued To Chief Officer (Place) and Enterprise Manager
Copied To Chief Executive, Deputy Chief Executive and Enterprise Development Manager 
Page 51 of 144

Page 52

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit Reports.docx 
15
1.  Executive Summary 
Objectives
The audit sought to answer the following questions: 
• Are there effective governance structures that provide periodic updates on progress/status and strong and
effective oversight, challenge and direction?  Does this include appropriate consideration of relevant risks
and how key risks are being managed? 
• Is it clear what the current stage of the programme is intended to deliver?  Are short-term scope and
milestones realistic, understood, clearly articulated and capable of being met? 
• Are there appropriate financial controls in place to ensure decisions made are in line with approved
budgets?  
Work undertaken involved obtaining evidence of key processes and procedures and interviewing relevant staff,
as well as an assessment of the governance arrangements against corporate expectations and a good practice
checklist prepared by Internal Audit based on a range of sources including the National Audit Office, HM
Treasury and the Cabinet Office Infrastructure and Projects Authority.  The audit did not consider how the
Council manages expenditure against UKSPF projects or how this is reclaimed from GCR as the Lead Authority.
Internal Audit is required to submit an Annual Assurance Statement to Glasgow City Council as the lead auditor
of the GCR City Deal. This audit of the UKSPF will support completion of this statement.   
This engagement has been conducted in accordance with the Public Sector Internal Audit Standards.  The
Internal Audit section reports formally on conformance with these standards to the Audit and Scrutiny Panel.
We would like to thank officers involved in this audit for their cooperation and assistance. 
2.  Findings and Recommendations 
Good practice identified
We noted the following areas of good practice during the audit: 
• The Council has established robust governance arrangements, in the form of a Project Board and Project
Working Group, for planning, delivering, controlling, monitoring and reporting on the Council’s overarching
UKSPF programme and the individual projects that contribute to this.  These arrangements are generally
consistent with the requirements set out by the Council’s UKSPF Assurance Framework.
• A Position Risk Assessment and Risk and Issues Log have been developed for the UKSPF programme,
and these documents are updated on an ongoing basis and presented to the Project Board at least twice a
year.  
• Each project is supported by a documented Project Proposal that aligns the expected benefits of the project
with both the UK Government’s intervention themes, outputs and outcomes and the Council’s Ambition
Statements.
• A Project Workbook, consistent with the format required by the GCR, is maintained for each individual
project, which tracks progress on delivery timescales, financial profile and outputs and outcomes, and
provides evidence that amounts claimed are accurate, properly due and agree to the Council’s financial
ledger and/or back up records.   
Key areas requiring management action (High Priority)
No areas requiring urgent management action have been identified. 
Other areas for improvement (Medium Priority)
No other areas for improvement have been identified.   
Page 52 of 144

Page 53

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit Reports.docx
16
6. Action Plan UK SHARED PROSPERITY FUND (UKSPF) 0750/2025/002 
Ref Finding
1 There is scope to enhance the arrangements for the management and oversight of the UKSPF.
Whilst the Council’s arrangements are largely in line with the expectations and requirements of the Council’s UKSPF Assurance Framework, we identified a small number of
areas where we consider there is scope for improvement as follows:
• There is a lack of appropriate reporting on risk within Committee reports, including any issues and challenges encountered within individual projects and details of projects
which are at risk of not achieving full budget spend within the required timescales.
• The Council’s UKSPF Assurance Framework states that ‘The Board will consider all change requests and has delegated authority to approve financial changes both within
and between interventions, and where changes are less than 30% between investment priorities’.  From our review of a sample of individual projects, we noted that a decision
was taken, at project level, to reallocate underspent funds of £53,000 between two projects within the same investment priority (S36 to S38) without Board approval.
Implication Recommendation Priority Management response Implementation
Date
Those with responsibility for
governance of the UKSPF may not
have sufficient information on
progress/activity and risk, resulting in
a failure to provide effective oversight
and/or identify and take remedial or
corrective actions as required. 
The Chief Officer of Place should:  
(1) Review the progress reports to Committee and consider
whether there is scope to provide more detailed
information on the issues and challenges facing individual
projects and the risk of not achieving full budget spend
within the required timescales.
(2) Ensure that all decisions to make financial changes within
and between interventions and priorities are reported to,
and approved by, the Project Board in line with the
Council’s UKSPF Assurance Framework and that these
decisions are appropriately recorded in the minutes.
Low
Agree
Yvonne Weir, Enterprise Manager
(1) Future committee reports will provide
more detail on individual projects,
where required and relevant, and will
highlight the risks of not achieving full
budget spend within required
timescales.
(2) Steps will be taken to ensure that all
future financial changes are approved
by the Project Board in line with the
Council’s UKSPF Assurance
Framework and documented
accordingly. 
June 2025 and
ongoing thereafter 
Page 53 of 144

Page 54

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit Reports.docx
17 
INTERNAL AUDIT REPORT 
BUSINESS CONTINUITY PLANNING 
Headlines
In July 2022, we reported the results of work undertaken to provide independent assurance on the extent of
compliance across the Council with key corporate expectations in respect of business continuity planning. This
audit concluded that, while the Council had established adequate governance arrangements for business
continuity planning, including guidance notes and templates designed to assist Services in the preparation of
their business continuity plans, there was a need for improvement to the framework for documenting and
formally reviewing individual Service business continuity arrangements to enhance the quality and
completeness of the corresponding plans. 
The purpose of this audit was therefore, to provide assurance on the adequacy and effectiveness of actions
taken by management in relation to the previous audit findings and recommendations made in relation to
business continuity planning.
Based on the results of our work, we have categorised this audit as offering reasonable assurance. We were
pleased to note that significant work has been undertaken by the Resilience Planning Unit with regards to
business continuity planning which has resulted in a marked improvement in documenting business continuity
arrangements for individual Services. 
We are generally satisfied that the Council has reviewed and strengthened the control environment for
documenting, reviewing and testing business continuity arrangements, however, we have identified some areas
for improvement, which are detailed at Section 3 of this report and include:
• Processes around critical activities and workarounds for business continuity planning need to be
strengthened, with associated guidance reviewed, updated, and effectively communicated to Services.
• There is merit in Service business continuity arrangements being subject to critical appraisal and challenge.
• Proposed plans to better align business continuity and disaster recovery need to be progressed, finalised
and thereafter implemented.
It should be noted that whilst the Resilience Planning Unit are responsible for providing guidance and
assistance to Services with regards to documenting, reviewing and testing their business continuity
arrangements, it is the responsibility of individual Services to implement these arrangements. 
Internal Audit Opinion Reasonable assurance 
Priority of Recommendations
High Medium Low
0  3 1 
Organisational Impact Minor 
Report status FINAL Audit ref 0900/2025/007 Date issued 25/04/2025
Audit Team Lynn McCrum and Lesley Armstrong
Issued To Depute Chief Executive and Resilience Planning Manager
Copied To Chief Executive and Resilience Planning Officer  
Page 54 of 144

Page 55

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit Reports.docx
18
1.  Executive Summary 
Objectives
The audit sought to answer the following questions:
• Does the Council have adequate and effective governance arrangements, policies and procedures in
relation to business continuity planning?
• Is there evidence that Services have established, and are regularly reviewing, their business continuity
plans?
• Is there evidence that Services are undertaking appropriate, regular and timely testing of business
continuity plans?
• Where business continuity plans have been required to be actioned, did plans work in line with expectations
and were appropriate lessons identified, logged and monitored?
Work undertaken included reviewing and testing business continuity arrangements at both a Corporate and
Service level but did not extend to the Council’s Corporate Resilience Plan or Disaster Recovery arrangements. 
Business and Digital Solutions are currently responsible for Disaster Recovery Planning, with support from the
Resilience Planning Unit. 
This engagement has been conducted in accordance with the Public Sector Internal Audit Standards.  The
Internal Audit section reports formally on conformance with these standards to the Audit and Scrutiny Panel.
We would like to thank officers involved in this audit for their cooperation and assistance. 
2.  Findings and Recommendations 
Good practice identified
We noted the following areas of good practice during the audit:
• The Resilience Planning Unit is responsible for day-to-day management and monitoring of the Council’s
overall resilience and is supported by the Corporate Resilience Management Team.
• The Council have a Corporate Business Continuity Plan and separate Business Continuity Plans for each
of the 22 individual Service areas. 
• A suite of documentation has been designed to aid Service personnel when reviewing, updating, testing
and invoking the Corporate and Service Business Continuity Plans.
• A network of Business Continuity Champions has been established to co-ordinate the testing, review and
update of business continuity arrangements in each Service. 
Key areas requiring management action (High Priority)
No areas requiring urgent management action have been identified. 
Other areas for improvement (Medium Priority)
A number of other areas for improvement were identified: 
• Processes around critical activities and workarounds for business continuity planning need to be
strengthened, with associated guidance reviewed, updated, and effectively communicated to Services.
• There is merit in Service business continuity arrangements being subject to critical appraisal and
challenge.
• Proposed plans to better align business continuity and disaster recovery need to be progressed, finalised
and thereafter implemented. 
Page 55 of 144

Page 56

7. Action Plan Business Continuity Planning  0900/2025/007 
Ref Finding
1 Processes around critical activities and workarounds for business continuity planning need to be strengthened, with associated
guidance reviewed, updated and effectively communicated to Services.
We were pleased to note that significant progress has been made in improving the Council’s business continuity framework since the previous audit. To support the ongoing
development of this framework and associated Business Continuity Plans, guidance notes and templates (e.g. Scenario Planning Template; Testing Discussion Template; Service
Business Continuity Planning Review Guide; Log Sheet Template and Invocation Record) have been developed and made available to Services outlining the governance
arrangements and process for invoking and standing down Business Continuity Plans in the event of an incident, to notify them of nominated Business Continuity Champions
and to assist them in reviewing, testing and invoking their Business Continuity Plans.  
From our review of the arrangements, guidance and associated documentation, we consider that these adequately cover the basic elements of the business continuity planning
processes. We do, however, consider that there is scope for the guidance to be improved, and for the arrangements for individual Services to be further strengthened, to facilitate
more clear and concise Service Business Continuity Plans which are fully reflective of the Services’ critical activities and workarounds to support resilience and/or recovery, in
the event of an incident affecting either one, several or all Services.  We recognise that most of these areas for improvement have been the subject of discussions and emails
both individually with the Resilience Planning Unit and collectively as part of the Business Continuity Champions Group meetings and details of these are documented at Appendix
2.
We were informed by the Resilience Planning Unit that, as part of the annual review of business continuity planning arrangements, Services have been advised to expand their
workarounds, however, due to the timing of the audit, we were unable to assess these revised arrangements as the annual review was still in progress.
Implication Recommendation Priority Management response Implementation
Date
If guidance and processes related
to critical activities and
workarounds are insufficient,
Business Continuity Plans may not
fully align with the necessary
methodology and procedures
required during an incident,
potentially leading to prolonged
disruption critical services. 
Furthermore, without clearly
documented procedures, Services
may lack awareness of expected
practices and required
documentation, resulting in
inconsistent application across
individual Services.
The Depute Chief Executive should review
the business continuity framework, including
guidance and processes, and ensure that the
arrangements, guidance and associated
templates for business continuity planning are
expanded to take cognisance of, and clearly
detail, each of the points outlined at Appendix
2. Any revised guidance should be
disseminated to individual Services.
Medium 
Agree
Naomi Kane, Resilience Planning Officer
Service plans have been reviewed since this audit took place
therefore, some changes have already been implemented (i.e.
development of service workarounds and guidance support).
The 2025 Business Continuity guidance now incorporates new
guidance to further support the Business Continuity
framework.
The Resilience Planning Unit will work to encourage services
to continuously develop their workarounds. This will include
adding in workarounds for people and IT dependencies. The
responsibility for the development of Business Continuity
arrangements (including workarounds) lies with the Services
to update and review.
Further responses to the detailed areas for improvement are
documented at Appendix 2.
Note: The implementation date reflects the date of the next
scheduled review and update of Services’ Business Continuity
Plans. 
May 2026
Page 56 of 144

Page 57

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit Reports.docx
20 
5. Action Plan (continued) Business Continuity Planning 0900/2025/007 
Ref Finding
2 There is merit in Service business continuity arrangements being subject to critical appraisal and challenge.
The Resilience Planning Unit has been integral in the development of Service business continuity arrangements/plans, however, while they can advise and guide Services, the
plans and the content within them are Service led.  This is primarily due to the Resilience Planning Unit having limited detailed knowledge of the different aspects of individual
Services and the associated critical activities and processes/workarounds to support resilience and/or recovery of these critical services.
Given that Service Business Continuity Plans have now been in place for a full year and are currently in the process of being reviewed, we consider that they would benefit from
being critically appraised and challenged by an independent officer to ensure that they clearly detail the methodology and workarounds which will enable critical activities to be
maintained or promptly resumed in the event of an incident occurring which could impact on the delivery of service.  
Implication Recommendation Priority Management response Implementation
Date
Without adequate scrutiny and
challenge, Services Business
Continuity Plans may not contain
adequate arrangements to enable
the continued delivery of critical
services in the event of an incident.
The Depute Chief Executive should ensure
that the content of Service business continuity
arrangements/plans are subject to scrutiny
and challenge to ensure these
arrangements/plans are adequate,
comprehensive and accurately reflect the
Service’s arrangements, including critical
activities and processes/workarounds to
support resilience and/or recovery.
Medium 
Agree
Andrew McPherson, Depute Chief Executive
Service plans are subject to scrutiny by Plan Reviewers and
Plan Advisors. However, overall authorisation that information
is accurate and up to date lies with the Plan Authoriser (Chief
Officer).
Going forward, the Depute Chief Executive will ensure that
Chief Officers are aware of this responsibility. 
June 2025 
Page 57 of 144

Page 58

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit Reports.docx
21 
3. Action Plan (continued) Business Continuity Planning 0900/2025/007 
Ref Finding
3 Proposed plans to better align business continuity and disaster recovery need to be progressed, finalised and implemented.
Service Business Continuity Plans contain the standard wording ‘it should be noted that Services can utilise their Service Disaster Recovery Plan in the event of any IT incident’.
From our review of a sample of Service Business Continuity Plans, we noted that some of these referenced the Disaster Recovery Plan as a workaround for loss of IT systems
but contained no link to this document.  
Corporate responsibility for Disaster Recovery Planning within the Council lies with the Information Security and Risk Team and the Council’s ICT Disaster Recovery arrangements
comprise IT application/system Disaster Recovery Plans and a separate ICT Major Incident Plan, which focuses on the ICT response elements of a major systems breach. The
ICT Disaster Recovery Plans provide detail on the recovery of IT systems which are Council-owned but do not record interim arrangements or workarounds for individual Services
should these systems be out of commission for a prolonged period of time. 
Historically, Service Business Continuity Plans included recovery times based on the expectations of the Service rather than reflecting those included in ICT Disaster Recovery
Plan and as such, there may be disparity between recovery timescales documented in the Business Continuity Plans and those stated in the ICT Disaster Recovery Plans. The
Information Security and Risk Team are currently analysing and comparing Service expectations per their Business Continuity Plans with Disaster Recovery Plans. This is still a
work-in-progress.   
Additionally, plans to ensure alignment/cohesion of Service Business Continuity Plans with ICT Disaster Recovery Plans are currently being developed, however, these are still
in their infancy.  This has been the subject of a number of presentations to Senior Management and includes plans for the procurement of corporate wide software for Business
Continuity, ICT Disaster Recovery, Incident Management and potentially Risk Management.   We consider that building a better relationship between business continuity
management and ICT Disaster Recovery, and co-ordinating these using a single tool, presents an opportunity to make the management of these arrangements both more effective
and efficient.
Implication Recommendation Priority
A disparity between recovery times documented
in Service Business Continuity Plans and ICT
Disaster Recovery Plans may result in Services
not being fully prepared for the impact caused by
a loss of key IT systems and the
processes/workarounds which need to be
adopted to minimise disruption to critical services.
The Depute Chief Executive should liaise with both the Resilience Planning Unit and Information Security and Risk
Team to ensure that:
(1) The current exercise to analyse and compare Service expectations as detailed in their Business Continuity Plan
with Disaster Recovery Plans is progressed and concluded, with action thereafter taken to ensure that planned
recovery times in relation to ICT disaster recovery are properly reflected in Service Business Continuity Plans.
(2) Proposed plans for better alignment/cohesion of Service business continuity arrangements with ICT disaster
recovery arrangements are further developed and implemented.  This should include ensuring that an action plan
is prepared which sufficiently details actions to be undertaken, responsible officers and associated timescales to
enable progress to be tracked on an ongoing basis.
Medium 
Page 58 of 144

Page 59

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit Reports.docx
22 
3. Action Plan (continued) Business Continuity Planning 0900/2025/007 
Management response Implementation
Date
Agree
(1) Rob Leitch, Information Risk Manager
The Information Risk Manager is currently analysing the Recovery Time Objectives for ICT systems identified as supporting critical Council functions within
the Services’ Business Continuity Plans with that recorded in the ICT Disaster Recovery Plans. This is a manual process which is time consuming.
Business Continuity Champions have been asked to consider Business Continuity and Disaster Recovery timing when reviewing planning arrangements.
Going forward, there will be consideration of combining the Business Continuity and Disaster Recovery champion role to ensure consistency. 
(2) Naomi Kane, Resilience Planning Officer and Rob Leitch, Information Risk Manager
The Business Continuity and Disaster Recovery arrangements must be aligned. Further work will be scheduled after the Resilience Planning Unit and IT
have met to discuss an action plan. This has been delayed due to the Council restructure. Disaster Recovery arrangements must be progressed in order for
this action to be completed.  Consideration of a software to assist the alignment of the Business Continuity/Disaster Recovery process is ongoing and may
be implemented in due course.
Note: The implementation date reflects the time period for procurement and implementation of a software system for Business Continuity/Disaster Recovery. 
April 2026 
April 2027  
Page 59 of 144

Page 60

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit Reports.docx
23
3. Action Plan (continued) Business Continuity Planning 0900/2025/007 
Ref Finding
4 There is a need to obtain annual assurance on compliance with business continuity practices and report the outcome to Committee.
The year-end Chief Officer Assurance Checklist and Certificate has been updated to incorporate new questions in relation to Business Continuity Planning. At the time of testing,
the document relating to 2024-25 had not yet been issued to Chief Officers for completion, therefore, we were unable to verify the responses and/or quality of information provided
to support those responses.  We were advised that once the returns have been made by the Chief Officers, these will be collated by the Strategy and Performance Team and
thereafter, an extract of all responses to business continuity questions will be shared with the Resilience Planning Unit for review, alongside the information gathered from Services
on the testing of business continuity arrangements.  It is intended that the outcome of this review will form the basis of the annual report, scheduled to be submitted to the
Environment and Climate Committee in September 2025, to provide assurance that expected practices are being applied appropriately and consistently across all Services and
that the Council is complying with its statutory obligations in relation to the Civil Contingencies Act 2004.  
Implication Recommendation Priority Management response Implementation
Date
There is a risk that the
Council may not be
complying with its statutory
obligations in relation to
business continuity planning.
The Depute Chief Executive should ensure that, as
intended:
(1) Appropriate review and consideration are given to
both the responses received from Chief Officers in
respect of business continuity and the information
provided directly by Services in relation to the
testing of their business continuity arrangements.
(2) A report is thereafter prepared and submitted to
the Environment and Climate Committee providing
assurance on the extent to which expected
practices are being applied appropriately and
consistently across all areas of the Council and
that the Council is complying with its statutory
obligations.  
Low 
Agree
Andrew McPherson, Depute Chief Executive
(1) The responses to business continuity questions
included in the Chief Officers annual assurance
returns issued by the Strategy and Performance Team
will be reviewed by the Resilience Planning Unit to
ensure compliance has been met.
(2) A report was submitted to the Environment and
Climate Change Committee in 2024, and another
report will be prepared and submitted in 2025. 
September 2025 
Page 60 of 144

Page 61

Appendix 2 – Identified areas for improvement in business continuity framework 
Ref Area for improvement Management comments
1 For each critical activity identified in their Business
Continuity Plan, Services are required to document
the number of staff required, expected timescales
for recovery and associated IT applications,
however, there is currently no requirement to
record workarounds in relation to actual incidents
affecting the availability of staff or IT systems which
the Service depends upon.
Agree
This will be implemented in the next review
(scheduled April 2026). The 2025 guidance
document review has already incorporated
consideration of IT and People workarounds.
This will be raised at the next Business Continuity
Champions meeting.
2 We consider that Service Business Continuity
Plans are not always fully reflective of the
workarounds required to ensure continuation of
critical activities in the event of an incident
occurring, including links to
documentation/processes and details of how
alternative arrangements should be carried out or
alternative suppliers should be contacted.  This is
particularly important in relation to manual
workarounds for key IT systems.
Agree
Development of workarounds is the responsibility of
the Service. Going forward, Chief Officers are
required to review the plan and ensure accurate
information is held/accessible. The Resilience
Planning Unit will continue to encourage and support
this.
3 There is no clear definition, including examples, of
what constitutes a critical activity and/or potential
hazard and how these should be identified.
Additionally, the guidance does not distinguish
between a critical activity and a scenario.
Agree 
No clear examples included, however, Resilience
Planning cannot provide a clear example of a critical
activity as this differs per Service.
The 2025 guidance now differentiates between the
meaning of a scenario and critical activity.
4 The guidance does not outline how to
identify/document the workarounds required to
maintain critical services in the event of an incident.
Partially Agree
There is an area to document workarounds in each
plan.
Agree that there is no reference to the definition of a
workaround in the guidance. The 2025 guidance
review now includes this.
5 Whilst the Testing Discussion Template includes
sections for documenting lessons identified, next
steps and any additional comments, it does not
specifically require improvement actions arising
from lessons identified to be recorded, monitored
and tracked.
Agree
Reviewed 2025 guidance and a link to the action
tracker template to address this can now be found in
the Testing Discussion Template document.
6 There is no reference of the need to identify, record
and monitor lessons learned and corresponding
actions where a Business Continuity Plan has been
invoked. 
Agree
An action tracker template has been created (link to
this template can be found in the reviewed 2025
guidance and also in the Testing Discussion
Template document). 
7 Details of the expectations regarding ‘loggists’
(including numbers per individual Service area and
their roles and responsibilities) and completion of
the Log Sheet are not stated. 
Agree 
Whilst we agree, there is no requirement on the
Services to have ‘loggists’; as this is best practice. 
All members of staff should know to log any
actions/decisions during an incident. 
The Resilience Planning Unit have aided by
providing ‘loggist’ training. Services can note who
has attended this training and details will also be
recorded in LearnNL.  
Page 61 of 144

Page 62

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit Reports.docx
25
Ref Area for improvement Management comments
8 The list of Business Continuity Champions
contained in the Guidance Note requires to be
updated to accurately reflect the current officers
within this role. Consideration should be given as
to whether this should be a standalone document,
with a link included in the guidance notes.
Agree
Business Continuity Champions are now noted in a
separate document. This will be saved on Resilience
Direct, and the reviewed guidance contains a link to
this.
9 The governance arrangements, as stated in the
Guidance Notes do not reflect that assurance is
now sought from individual Services as part of the
Chief Officer Assurance Checklist and Certificate
issued annually by the Strategy and Performance
Team.
Agree
This has been incorporated into the 2025 guidance
document review.
Page 62 of 144

Page 63

INTERNAL AUDIT REPORT 
HOUSING AND CORPORATE MAINTENANCE AND
IMPROVEMENT SERVICES CONTRACT 
Headlines
The purpose of this review was to provide assurance on the adequacy and effectiveness of the Council’s
contract management arrangements for the mobilisation and implementation of the Housing and Corporate
Maintenance and Improvement Services Contract (hereafter referred to as the ‘Housing Contract’).
The review focussed on tracking the progress made in implementing the management actions, including the
robustness of the action taken and the extent to which this fulfils the recommendations, detailed in the two
recent reports in this area – Enterprise Project: Housing and Corporate Procurement (issued in February 2024)
and Audit Scotland Whistleblowing Allegations (issued in April 2024).
Based on the results of our work, we were pleased to note that significant progress has been made in
implementing the recommendations contained in both reports, with some aspects, including those relating to
the Intelligent Client Function, contract management, performance management and the Mobilisation Plan,
where we consider that interim or essential elements have now been fully implemented.  However, as the
Housing Contract only commenced in July 2024 and is still within the first year of operation, there remains a
number of areas where more advanced and fully established arrangements have not yet been finalised and
require further development to ensure that they are properly embedded.
Progress made to date in relation to each of the recommendations included in the previous reports are detailed
at Appendix 1 (Enterprise Project) and Appendix 2 (Whistleblowing Allegations).  Additionally, details of all
recommendations which have not yet been fully implemented are included at Appendix 3, along with details of
the issues which we consider remain outstanding and require further action. 
Report status FINAL Audit ref 0800/2025/001 Date issued 25/04/25
Audit Team Susan Whyte and Lesley Armstrong
Issued To Chief Officer (Assets and Procurement) and Chief Officer (Housing)
Copied To Repairs and Maintenance Manager (Housing), Repairs and Maintenance Manager
(Corporate) and Contract Performance and Assurance Manager
Chief Executive and Deputy Chief Executive 
Page 63 of 144

Page 64

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit Reports.docx
27
1. Background
1.1 In December 2021, approval was given by the Council to proceed with the procurement in relation to the
provision of housing and corporate maintenance and improvement services.  The procurement exercise
commenced in June 2022, however, despite comprehensive and positive pre-procurement market
engagement, only one bidder (Mears Limited) requested to participate.  Following confirmation that the
bidder satisfied the required selection criteria, in December 2022, the Policy and Strategy Committee
approved that the exercise should progress to the formal tender stage, with Mears Limited as the sole
bidder.  The Council took steps to ensure that the proposals continued to represent value for money and,
in August 2023, concluded that the current procurement exercise remained appropriate.  The Council
approved the award of the Housing and Corporate Maintenance Contract to Mears Limited in May 2024,
with the contract commencing in July 2024.
1.2 Internal Audit undertook various exercises throughout the duration of the Enterprise Project, providing
assurance around the adequacy and effectiveness of the Council’s governance arrangements, that the
project had been managed in accordance with corporate expectations and good practice, and that
management’s assessment of best value, as a result of a single bidder scenario, provided a reasonable
basis to inform and support decision making.
1.3 In December 2023, Audit Scotland received allegations from a whistleblower relating to Mears LLP and
these were passed to Internal Audit for investigation.  The outcome of this investigation and the report on
the latest exercise of the Enterprise Project were reported to the Audit and Scrutiny Panel in May 2024.
1.4 The purpose of this review was to track the progress of the management actions, including the robustness
of the action taken and the extent to which this fulfils the recommendations, for both reports outlined in 1.2
and 1.3 above. 
2. Work undertaken by Internal Audit
2.1 Work undertaken included discussions with appropriate officers within the relevant Services and reviewing
evidence, to determine whether the actions taken to date are sufficiently robust to alleviate the risks and
fulfil the recommendations made in both reports. 
3. Current status of previous recommendations
3.1 A total of 10 recommendations were made across the two audit reports (Enterprise Project and Audit
Scotland Whistleblowing Allegations), however, given that many of the recommendations related to the
contract management arrangements for the new Housing Contract which only commenced in July 2024,
these were split into 19 implementation phases.
3.2 The table below summarises the progress of the recommendations contained in each report, split by
implementation phase.  Overall, eight of the agreed actions have been fully implemented, nine substantially
implemented and one partially implemented.  Additionally, one action is no longer achievable, although
alternative arrangements are currently being progressed to satisfy the recommendation. 
Report Fully
Implemented
Substantially
Implemented
Partially
Implemented
No Longer
Relevant
Enterprise Project Report 4 4 0 0
Audit Scotland Whistleblowing
Allegations 4 5 1 1
Total 8 9 1 1 
3.3 Further details of the progress of the individual recommendations and management actions is contained at
Appendix 1 and Appendix 2, together with details of each implementation stage, the planned implementation
date and the implementation status as at March 2025. 
Page 64 of 144

Page 65

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit Reports.docx
28
APPENDIX 1 – Enterprise Project: Housing and Corporate Procurement 
Details from original recommendation Internal Audit comment
Recommendation 1:
The Depute Chief Executive should ensure that, as a matter of urgency, work is
undertaken to develop and thereafter formally document the ‘Intelligent Client’ function.
This should comprise the oversight and assurance role within the Council to manage the
relationship with the successful bidder and be responsible for monitoring performance to
ensure that the required outcomes and standards of performance are achieved with clear
roles and responsibilities for all levels involved.
Management response:
As a priority, management will undertake work to develop and implement the ‘Intelligent
Client’ function aligned with the provisions of the contract and the audit recommendation.
It should be noted that this is a significant piece of work, which will require input from a
number of Chief Officers and other professional supports, which given the short contract
mobilisation period, through necessity will extend beyond the service commencement
date. The Enterprise Project Team will provide support to the development and
implementation of the ‘Intelligent Client’ function.
Progress to date:
An Intelligent Client Function, which provides an oversight and assurance role for the
Housing Contract, has been developed and comprises five governance groups, each
with distinct roles and responsibilities, and a centralised Contract Performance and
Assurance team which is responsible for overseeing the Housing Contract and
supporting the Intelligent Client structure.  These arrangements are documented within
the contract.  Performance management is included in the roles and responsibilities for
both the Service Management Group (Level 3) and the Contract Delivery Management
Group (Level 4), and these groups now meet in line with the timeframes set out in the
contract documentation.  The Enterprise Project team was responsible, on an interim
basis, for providing contract management support, however, a centralised Contract
Performance and Assurance team has now been established and oversees the Housing
Contract while supporting the Intelligent Client structure. There has been a smooth
transition of oversight responsibilities between these teams. 
Completion stage Planned implementation
date Implementation status as at March 2025
The essential elements for effective performance management July 2024 Fully Implemented
More advanced approaches developed and introduced, as a priority, on a phased basis
thereafter 
September 2024 Fully Implemented 
Page 65 of 144

Page 66

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit Reports.docx
29 
Details from original recommendation Internal Audit comment
Recommendation 2:
The Depute Chief Executive should ensure that appropriate and robust contract
management arrangements, proportionate to the size and scale of this contract and
reflecting good practice, are developed, formally documented, and clearly
communicated to the team appointed to manage this contract.
Management response:
Appropriate and robust contract management arrangements, proportionate to the size
and scale of this contract and reflecting good practice, will be developed, formally
documented, and clearly communicated to the team appointed to manage this contract,
aligned with the expectations set out in the audit recommendation. Update reports
provided to the Enterprise and Communities management team every 6 months
reporting progress on the implementation of the agreed actions. It should be noted that
this is a significant piece of work, which will require input from a number of Chief Officers
and other professional supports, which given the short contract mobilisation period,
through necessity will extend beyond the service commencement date. The Enterprise
Project Team will provide support to the development and implementation of the
‘Intelligent Client’ function.
Progress to date:
A Contract Management Toolkit, which sets out the different aspects of the contract
management arrangements and provides links to relevant documents and registers to
facilitate ongoing monitoring and ensure consistency of recording, has been developed
and generally follows good practice requirements.  Training and awareness sessions
have been held with relevant officers to raise awareness of the expected contract
management arrangements for the Housing Contract.  
Aspects still outstanding:
We are satisfied that good progress has been made towards implementing the
requirements of this recommendation, however, comprehensive and detailed financial
management arrangements have not yet been finalised to enable the financial
performance of the Housing Contract to be effectively and robustly tracked and
managed.
Completion stage Planned implementation
date Implementation status as at March 2025
The essential elements for effective contract management July 2024 Fully Implemented
More advanced approaches developed and introduced, aligned with contract
commitments, on a phased basis. 
July 2025 (Not Yet Due) Substantially implemented (see Appendix 3) 
Page 66 of 144

Page 67

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit Reports.docx
30 
Details from original recommendation Internal Audit comment
Recommendation 3:
The Depute Chief Executive should ensure that the identified contract mobilisation tasks
are completed in an appropriate and timely manner.
Management response:
As acknowledged in the audit report, a mobilisation group and plan is in place and being
progressed with the Chief Officer (Housing Management) overseeing delivery of the
plan. The Chief Officer (Housing Management) will ensure that the tasks contained in
the mobilisation plan are implemented in accordance with the agreed timescales and
report progress on a regular basis to Enterprise Project Board. Some mobilisation tasks
are required in advance of commencement of contracted service delivery date, others
on a phased basis thereafter aligned with contractual provisions.
Progress to date:
A Mobilisation Programme, detailing all required mobilisation tasks together with
timescales and lead officers, was created and is regularly monitored and updated to
confirm progress to date.
Aspects still outstanding:
From our review of the Mobilisation Programme, we confirmed that the majority of the
recorded tasks have now been completed, however, one task remains outstanding. 
Arrangements are in place to ensure updates on this remaining task are reported to the
governance groups and we were advised that the outstanding issues are expected to be
resolved shortly.
Completion stage Planned implementation
date Implementation status as at March 2025
Completion of the essential mobilisation tasks to support commencement of contracted
service delivery
July 2024 Fully Implemented
Remaining mobilisation tasks aligned with contract provisions December 2024 Substantially implemented (see Appendix 3) 
Page 67 of 144

Page 68

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit Reports.docx
31 
Details from original recommendation Internal Audit comment
Recommendation 4:
The Depute Chief Executive should ensure that a Benefits Realisation Plan is
prepared to record, calculate, and monitor the social value aspects of the Enterprise
Project, with regular and timely reporting to key stakeholders.
Management response:
The Enterprise Project Team shall: 
• Develop a template Benefits Realisation Plan which will make provision for
frequency of measurement, recording mechanisms, monitoring arrangements,
related roles and responsibilities of the contract management team and other
Council teams. 
• Provide documentation on all benefits committed to by the Contractor and the
timescale for delivery of the benefits to the team appointed to manage the contract
(see management response to audit recommendation 1).  
• Communicate to the team appointed to manage the contract, how the contract
management arrangements for benefits realisation (including corrective action) in
the new contract should operate. 
The team appointed to manage the contract (see management response to audit
recommendation 1) shall manage the delivery of the Benefits Realisation Plan and
report on the contractor’s performance against the plan. The information shall be
prepared in advance of the first Contract Service Management Group meeting
which shall be held quarterly with the first meeting 3 months after Service
Commencement.
Progress to date:
A Benefits Realisation Plan, which reflects the social value commitments included within the
Housing Contract, has been developed and, although still in the early stages of development,
appropriate arrangements are in place for recording, reporting and monitoring the social value
aspects of the Housing Contract.  Social value is a standing agenda item, and is therefore
discussed on a regular basis, at the Service Management Group and Contract Delivery
Management Group.  Additionally, benefit owners have been identified and are responsible
for individual social value commitments and there is a dedicated Social Value Governance
group which specifically discusses and considers the social value aspects contained within
the contract documentation. 
Aspects still outstanding: 
We are satisfied that good progress has been made towards implementing this
recommendation.  Details of progress against social value commitments, set out in the
contract documentation, will be included in the annual report and will be presented to elected
members, however, as this is not due until July 2025, arrangements for reporting to all key
stakeholders are not yet fully established.
Completion stage Planned implementation date Implementation status as at March 2025
All aspects due to completion  September 2024 Substantially Implemented (see Appendix 3) 
Page 68 of 144

Page 69

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit Reports.docx
32 
Details from original recommendation Internal Audit comment
Recommendation 5:
The Depute Chief Executive should ensure that a procurement engagement and
assessment process for the non-exclusive element of the Enterprise Contract (Core
Projects) is developed, fully documented, and clearly communicated to, and properly
implemented by, the team appointed to manage the contract.
Management response:
The team appointed to manage the contract (see management response to audit
recommendation 1) will ensure that a procurement engagement and assessment
process for the non-exclusive element of the Housing and Corporate Contract (Core
Projects) is developed, fully documented, clearly communicated, and properly
implemented. The Enterprise Project Team will provide support to the development and
implementation of the engagement process.
Progress to date:
Section B, clauses 8.3 and 8.4 of the contract documentation state that Mears Limited
will be provided with the first opportunity to submit proposals for the delivery of individual
core projects as described in the Annual Service Delivery Plan (ASDP) and that for such
projects, Mears Limited is obligated to submit a project response.   However, clause 8.5
states that the decision to award each project is at the Council’s discretion.
An ASDP for 2025/26 has been developed, in conjunction and agreement with Mears
Limited, which records details of the anticipated core projects for the year which Mears
Limited will be obliged to provide responses to as part of the Housing Contract.  
An engagement process has been established for Mears Limited to bid on core projects
which includes a register of all core projects, standard expression of interest forms and
a standard file structure, to be used for each core project, for retaining relevant
documentation such as standard forms, correspondence issued to Mears Limited,
responses received and award decisions.  
Aspects still outstanding:
From our review of a sample of core projects awarded to date, we noted a lack of
consistency in the documentation retained and occasions where the documentation held
did not adequately support the decisions made.  We were advised, however, that
arrangements to actively monitor and review the core project award process, to gain
assurance that expected processes and procedures are being followed consistently, are
currently being developed.
Completion stage Planned implementation
date Implementation status as at March 2025
All aspects due to completion  December 2024 Substantially Implemented (see Appendix 3) 
Page 69 of 144

Page 70

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit Reports.docx
33
APPENDIX 2 – Audit Scotland Whistleblowing Allegations 
Details from original recommendation Internal Audit comment
Recommendation 1:
The Depute Chief Executive should ensure that, if a contract award is made to Mears for
the Housing and Corporate Property Maintenance element of the Enterprise project,
robust arrangements are put in place which provide regular ongoing assurance to the
Council that the identified issue of completion dates for repair jobs being retrospectively
changed by Mears staff has ceased and does not re-occur.
Management response:
At the time of this response, the Service has received confirmation from Mears that action
has already been taken to ensure no re-occurrence of completion dates for repair jobs
being retrospectively changed in the future. Management will undertake work to develop
and implement arrangements to provide regular ongoing assurance to the Council that
the identified issue of completion dates for repair jobs being retrospectively changed by
Mears staff has ceased and does not re-occur. Furthermore, incorporated in the
proposed contract are measures that provide the basis for improved contract
management (including, among others, an expanded suite of KPIs/SPIs, multi-layered
governance structure, financial deductions model, benefits plan and annual performance
report). The Service will liaise with Internal Audit with a view to implementing an
independent verification of the arrangements, with frequencies to be agreed with Internal
Audit. This piece of work will be developed alongside the development of the new suite
of monitoring reports and will include assurance that retrospective date changes cannot
occur in the future.  The service will require input from a number of Chief Officers, Internal
Audit and other professional supports, which given the short contract mobilisation period,
through necessity will extend beyond the service commencement date. Appendix 3
contains additional contextual information from both Service management and Mears
LLP in relation to the operational environment and challenges encountered.
Progress to date:
Due to operational requirements, completion dates for repair jobs can still be
retrospectively changed on the MCM system, used by Mears Limited, however, access
to amend completion dates has been restricted to eight senior managers.  
Reports detailing all changes to completion dates are produced and provided to the
Council on a weekly basis and these are reviewed by the Business Development and
Support team and followed up with Mears Limited as required.  We reviewed a report
detailing completion date changes from the beginning of the Housing Contract and did
not identify any significant issues or concerns.  Until recently, there was an issue within
the MCM system whereby the reports detailing changes to completion dates were
picking up changes made by non-authorised users where jobs were being closed in error
(e.g. when another trade was required to do additional work).  Mears Limited have,
however, now resolved this issue and the most recent report provided to the Council only
included a very small number of date changes and all of these had been processed by
one of the authorised users. 
Completion stage Planned implementation
date Implementation status as at March 2025
Cessation of retrospective changing of completion dates July 2024 No longer achievable (alternative arrangements
developed)
Interim arrangements August 2024 Fully Implemented
Fully established arrangements December 2024 Fully Implemented 
Page 70 of 144

Page 71

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit Reports.docx
34 
Details from original recommendation Internal Audit comment
Recommendation 2:
The Depute Chief Executive should ensure that, as a matter of urgency, a
comprehensive review of the performance management framework at operational level
for the Housing and Corporate Property Maintenance contract is undertaken with the aim
of establishing a more holistic approach to assessing and reporting performance to allow
more effective monitoring of delivery of the contract. This should incorporate monitoring
and reporting on performance against key targets but also on wider operational aspects
of repairs and maintenance work, including but not limited to, information on work in
progress, out of response jobs, cancellations, no access, post-inspections and tenant
satisfaction/feedback.
Management response:
Whilst the Service acknowledges Internal Audit’s opinion that management focus on
performance is ‘too narrow’ and a ‘more holistic approach’ should be taken, the Service
believes strongly that considerable effort has been made to identify any performance
challenges outwith the reported KPIs. This includes weekly meetings about work in
progress and out-of-response repairs. These improvements are evident in extremely
high levels of tenant satisfaction, repairs reported by tenants as being ‘right first time’,
and small numbers of complaints. All of this would suggest that, whilst a percentage of
overall repairs have been subject to completion date alteration, in overall terms the
Service and the contract have performed well. Incorporated in the proposed contract are
measures that provide the basis for improved contract management (including, among
others, an expanded suite of KPIs/SPIs, multilayered governance structure, financial
deductions model, benefits plan and annual performance report). However,
Management will undertake a comprehensive review of the performance management
framework at operational level for the Housing and Corporate Property Maintenance
contract, which will deliver a more holistic approach to assessing and reporting
performance to enable more effective monitoring of delivery of the contract. The Service
will also liaise with Internal Audit with a view to implementing an independent verification
of the arrangements. This piece of work will be developed alongside the development of
the new suite of monitoring reports. The service will require input from a number of Chief
Officers, Internal Audit and other professional supports, which given the short contract
mobilisation period, through necessity will extend beyond the service commencement
date.
Progress to date:
A performance management framework has been established and is recorded within the
contract documentation for the Housing Contract which includes a suite of Key
Performance Indicators (KPIs) and Strategic Performance Indicators (SPIs).  KPIs have
been established to enable operational performance, in respect of both Housing and
Corporate repairs, and also wider performance including health and safety, customer
satisfaction and value for money, to be calculated, reported and monitored.  The SPIs
detailed in the contract documentation include consideration of performance in relation
to social impact, climate, community participation and contract resilience. 
We consider that significant progress has been made in relation to this recommendation
with the development of a comprehensive performance management framework and
establishment of arrangements for monitoring performance on a regular basis both at an
operational level (through calculation and review of KPI data) and at a strategic level
(through the governance groups which have been established to monitor and review
performance and to manage the Housing Contract).
Aspects still outstanding:
However, given the early stages of the Housing Contract, some aspects require to be
more fully developed and embedded:
(1) A performance dashboard has been developed for reporting performance in relation
to KPIs, however, arrangements for populating and checking the information
recorded, need to be further developed to enable performance to be effectively and
accurately recorded, reviewed and monitored. 
(2) Arrangements for monitoring and reporting on performance in relation to core
projects have not yet been finalised.  
(3) As the first year of the Housing Contract is not yet complete, an annual report has
not yet been produced therefore, we were unable to confirm the robustness of the
arrangements for reporting performance against the SPIs recorded in the contract
documentation to key stakeholders.
Completion stage Planned implementation
date Implementation status as at March 2025
Interim arrangements September 2024 Substantially Implemented (see Appendix 3)
Fully established arrangements  July 2025 (Not Yet Due) Partially Implemented (see Appendix 3)  
Page 71 of 144

Page 72

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit Reports.docx
35
Details from original recommendation Internal Audit comment
Recommendation 3:
The Depute Chief Executive should ensure that all performance measures which are
monitored and/or reported should have detailed definitions sheets prepared setting out
the information sources, how the measures are calculated, their relevant components
parts and any exclusions. These arrangements should also include retention of key
supporting documentation and appropriate quality assurance/verification processes.
Management response:
Management will ensure that all performance measures which are monitored and/or
reported have detailed definitions sheets prepared setting out the information sources,
how the measures are calculated, their relevant components parts and any exclusions.
These arrangements will also include retention of key supporting documentation and
appropriate quality assurance/verification processes. This piece of work will be
developed alongside the development of the new suite of monitoring reports.
Progress to date:
A Performance Handbook is currently being finalised, which includes definition sheets
for each of the KPIs which are required as part of the contract documentation, and key
documentation supporting the calculation of each of the KPIs is retained.  We also noted
that arrangements have been established for regular ongoing quality assurance and
verification, on a sample basis, of the data recorded on HSMS which is used to calculate
the KPIs.  Monthly meetings are held with Mears Limited to review samples of completed
jobs and obtain explanations for any unusual activity and these are followed up by
quarterly meetings to ensure issues arising are discussed and resolved.
Aspects still outstanding:
A small number of areas were identified where we consider there is scope for further
improvement:
(1) Definition sheets are in place for the KPIs which are reported as part of the Council’s
Strategic Performance Framework (SPF).  These sheets are reviewed annually
however, have not yet been fully updated to reflect any relevant changes arising
from the performance information contained within the new Housing Contract,
including revised job types and priority codes.
(2) We understand that the quarterly operational meetings with Mears Limited are not
minuted, therefore it may be difficult to ensure any actions agreed are subsequently
followed up and satisfactorily resolved.
Completion stage Planned implementation
date Implementation status as at March 2025
All existing performance measures August 2024 Substantially Implemented (see Appendix 3)
Other performance measures July 2025 (Not Yet Due) Substantially Implemented (see Appendix 3) 
Page 72 of 144

Page 73

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit Reports.docx
36 
Details from original recommendation Internal Audit comment
Recommendation 4:
The Depute Chief Executive should ensure that, for any new repairs and maintenance
contract where the contractor is responsible for measuring and reporting performance
achieved to the Council, appropriate arrangements are established to enable the Council
to verify that reported performance is consistent with expectations and represents an
accurate reflection of the service provided.
Management response:
Management will ensure that, for any new repairs and maintenance contract where the
contractor is responsible for measuring and reporting performance achieved to the
Council, appropriate arrangements are established to enable the Council to verify that
reported performance is consistent with expectations and represents an accurate
reflection of the service provided e.g. KPI’s, customer satisfaction, right first time and
work in progress. This piece of work will be developed alongside the development of the
new suite of monitoring reports, which given the short contract mobilisation period,
through necessity will extend beyond the service commencement date.
Progress to date:
Mears Limited are responsible for measuring and reporting KPIs relating to health and
safety, some aspects of customer satisfaction and value for money.  Supporting
documentation is not provided by Mears Limited detailing how these KPIs are calculated,
therefore the Council are not able to, and do not, verify the accuracy of these indicators. 
We understand that these indicators do not directly impact on performance of individual
repair jobs, therefore there is no requirement for the Council to independently verify the
reported figures.
KPIs on individual repair jobs are calculated by the Council using information recorded
on the HSMS system.  Although this information is imported from the Mears Limited
MCM repairs system, monitoring arrangements are in place to regularly review the data
contained in HSMS. The Business Development and Support team select a sample of
repair jobs where attendance/completion dates recorded on HSMS appear unusual or
unrealistic, for investigation and detailed review, in conjunction with Mears Limited, to
identify any issues arising.  Findings from these meetings are provided to, and reviewed
by, the Repairs and Maintenance Managers.  
A spreadsheet which maps the number of repair jobs completed each month and
subsequent months is now prepared to enable comparison and easy identification of any
additional repairs recorded as completed in subsequent months.  These spreadsheets
are also sent to senior officers within Housing and Corporate Repairs for further review.  
Completion stage Planned implementation
date Implementation status as at March 2025
Interim arrangements September 2024 Fully Implemented
Fully established arrangements July 2025 (Not Yet Due) Fully Implemented 
Page 73 of 144

Page 74

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit Reports.docx
37 
Details from original recommendation Internal Audit comment
Recommendation 5:
The Depute Chief Executive should ensure that the range of issues detailed at 4.4.12
and 4.4.13, which suggests scope for improvements in operational efficiency, are
considered by management with a view to identifying and agreeing any appropriate
actions arising. An action plan should be developed which captures all required actions,
timescales for completion and responsible officers. Thereafter, this should be tracked
and monitored with reporting of progress at appropriate intervals to key stakeholders.
Management response:
Management are aware of the issues raised in 4.4.12 and will ensure they are rectified
in the new contract; the original works agreement doesn’t appear to have provided a
clear definition of what was expected and will be resolved in any future contract.
Management are also aware of the range of operational issues at 4.4.13, which suggest
scope for improvement, and these will be considered by management, with a view to
identifying and agreeing appropriate actions.
An action plan will be developed, which captures all required actions, timescales for
completion and responsible officers.  It will be monitored and reported at appropriate
intervals to management and key stakeholders, as necessary, and will continue to be
monitored throughout the duration of the contract.
This piece of work will be developed alongside the development of the new suite of monitoring
reports, which given the short contract mobilisation period, through necessity will extend
beyond the service commencement date.
Progress to date:
We were advised by the Repairs and Maintenance Managers that the findings included
within the previous audit report were considered and incorporated into the contract
arrangements.  From our review of the issues detailed at 4.4.12 and 4.4.13 in the original
report, we were able to confirm that all had been considered, with appropriate action
taken for 10 of these.  For the remaining two issues appropriate action has been taken
to progress these, however, full implementation relies on IT system changes.
Aspects still outstanding:
Two of the issues detailed at 4.4.13 in the original report have not yet been fully
addressed however appropriate action is being taken to progress these as follows:
(1) There are limitations within the planning and scheduling system (Field Services). 
This is being considered as part of the build for the replacement of HSMS.
(2) Confusion over the application of no default requests (NDRs), with decisions being
applied inconsistently across business areas.  A request has been submitted to IT
to have six drop down reasons added to HSMS, and Housing are currently awaiting
a decision on the outcome. 
Completion stage Planned implementation
date Implementation status as at March 2025
Identification of improvement actions and creation of an action plan September 2024 Substantially Implemented (see Appendix 3)
Implementation of improvement actions contained in the action plan July 2025 (Not Yet Due) Substantially Implemented (see Appendix 3) 
Page 74 of 144

Page 75

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit Reports.docx
38
APPENDIX 3 – Aspects still outstanding from original reports 
Recommendation Original timescale Aspects identified as outstanding Management response 
Enterprise Project: Housing and Corporate Procurement
Recommendation 2
The Depute Chief Executive should ensure that
appropriate and robust contract management
arrangements, proportionate to the size and scale of
this contract and reflecting good practice, are
developed, formally documented, and clearly
communicated to the team appointed to manage this
contract.
July 2025
(More advanced
approaches
developed)
We are satisfied that good progress has been made
towards implementing the requirements of this
recommendation, however, comprehensive and detailed
financial management arrangements have not yet been
finalised to enable the financial performance of the Housing
Contract to be effectively and robustly tracked and
managed.
Responsible Officer:
Ross Dunn, Contract Performance
and Assurance Manager 
Revised Timescale:  July 2025 
(No revision to original timescale)
Recommendation 3
The Depute Chief Executive should ensure that the
identified contract mobilisation tasks are completed in
an appropriate and timely manner.
December 2024
(Remaining
mobilisation tasks)
From our review of the Mobilisation Programme, we
confirmed that the majority of the recorded tasks have now
been completed, however, one task remains outstanding. 
Arrangements are in place to ensure updates on this
remaining task are reported to the governance groups and
we were advised that the outstanding issues are expected
to be resolved shortly.
Responsible Officer:
Ross Dunn, Contract Performance
and Assurance Manager 
Revised Timescale:  May 2025
Recommendation 4
The Depute Chief Executive should ensure that a
Benefits Realisation Plan is prepared to record,
calculate, and monitor the social value aspects of the
Enterprise Project, with regular and timely reporting to
key stakeholders.
September 2024 We are satisfied that good progress has been made
towards implementing this recommendation.  Details of
progress against social value commitments, set out in the
contract documentation, will be included in the annual
report and will be presented to elected members however
this is not due until July 2025 and therefore arrangements
for reporting to all key stakeholders is not yet fully
established.
Responsible Officer:
Ross Dunn, Contract Performance
and Assurance Manager 
Revised Timescale: July 2025
Recommendation 5
The Depute Chief Executive should ensure that a
procurement engagement and assessment process
for the non-exclusive element of the Enterprise
Contract (Core Projects) is developed, fully
documented, and clearly communicated to, and
properly implemented by, the team appointed to
manage the contract.
December 2024 From our review of a sample of core projects awarded to
date, we noted a lack of consistency in the documentation
retained and occasions where the documentation held did
not adequately support the decisions made.  Arrangements
to actively monitor and review the core project award
process, to gain assurance that expected processes and
procedures are being followed consistently, are currently
being developed.  These arrangements should be
progressed and implemented promptly.
Responsible Officer:
Ross Dunn, Contract Performance
and Assurance Manager 
Revised Timescale:  May 2025 
Page 75 of 144

Page 76

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit Reports.docx
39 
Recommendation Original timescale Aspects identified as outstanding Management response
Audit Scotland Whistleblowing Allegations
Recommendation 2
The Depute Chief Executive should ensure that, as a
matter of urgency, a comprehensive review of the
performance management framework at operational
level for the Housing and Corporate Property
Maintenance contract is undertaken with the aim of
establishing a more holistic approach to assessing
and reporting performance to allow more effective
monitoring of delivery of the contract. This should
incorporate monitoring and reporting on performance
against key targets but also on wider operational
aspects of repairs and maintenance work, including
but not limited to, information on work in progress, out
of response jobs, cancellations, no access, post-
inspections and tenant satisfaction/feedback.
September 2024
(Interim
arrangements) 
July 2025
(Fully established
arrangements)
Given the early stages of the Housing Contract, some
aspects of the performance management framework
require to be more fully developed and embedded:
(1) A performance dashboard has been developed for
reporting performance in relation to KPIs, however,
arrangements for populating and checking the
information recorded, need to be further developed to
enable performance to be effectively and accurately
recorded, reviewed and monitored. 
(2) Arrangements for monitoring and reporting on
performance in relation to core projects have not yet
been finalised.  
(3) As the first year of the Housing Contract is not yet
complete, an annual report has not yet been produced
therefore, we were unable to confirm the robustness of
the arrangements for reporting performance against
the SPIs recorded in the contract documentation to key
stakeholders.
Responsible Officer: 
(1) Michelle Hendry, Repairs and
Maintenance Manager and Kevin
Doohan, Corporate Repairs and
Maintenance Manager
(2) Ross Dunn, Contract
Performance and Assurance
Manager
(3) Ross Dunn, Contract
Performance and Assurance
Manager 
Revised Timescales:
(1) July 2025 (with ongoing review)
(2) July 2025
(3) July 2025 
Recommendation 3
The Depute Chief Executive should ensure that all
performance measures which are monitored and/or
reported should have detailed definitions sheets
prepared setting out the information sources, how the
measures are calculated, their relevant components
parts and any exclusions. These arrangements should
also include retention of key supporting
documentation and appropriate quality
assurance/verification processes.
August 2024
(All existing
performance
measures) 
July 2025
(Other performance
measures)
A number of areas were identified where we consider there
is scope for further improvement:
(1) Definition sheets are in place for the KPIs which are
reported as part of the Council’s Strategic Performance
Framework (SPF).  These sheets are reviewed
annually however, have not yet been fully updated to
reflect any relevant changes arising from the
performance information contained within the new
Housing Contract, including revised job types and
priority codes.
(2) We understand that the quarterly operational meetings
with Mears Limited are not minuted therefore, it may be
difficult to ensure any actions agreed are subsequently
followed up and satisfactorily resolved.
Responsible Officer:
(1) Tracey Harper, Performance and
Improvement Manager
(2) Michelle Hendry, Repairs and
Maintenance Manager and Kevin
Doohan, Corporate Repairs and
Maintenance Manager 
Revised Timescales:
(1) July 2025
(2) May 2025  
Page 76 of 144

Page 77

https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/General/Final Report for ASP/May Panel/May ASP Final Audit Reports.docx
40
Recommendation Original timescale Aspects identified as outstanding Management response
Recommendation 5
The Depute Chief Executive should ensure that all
performance measures which are monitored and/or
reported should have detailed definitions sheets
prepared setting out the information sources, how the
measures are calculated, their relevant components
parts and any exclusions. These arrangements should
also include retention of key supporting
documentation and appropriate quality
assurance/verification processes.
September 2024
(Identification of
improvement actions
and creation of an
action plan) 
July 2025
(Implementation of
improvement
actions)
Two of the issues detailed at 4.4.13 in the original report
have not yet been fully addressed however appropriate
action is being taken to progress these as follows:
(1) There are limitations within the planning and
scheduling system (Field Services).  This is being
considered as part of the build for the replacement of
HSMS.
(2) Confusion over the application of no default requests
(NDRs), with decisions being applied inconsistently
across business areas.  A request has been submitted
to IT to have six drop down reasons added to HSMS,
and Housing are currently awaiting a decision on the
outcome.
(1) and (2)
Responsible Officer: 
Michelle Hendry, Repairs and
Maintenance Manager and Kevin
Doohan, Corporate Repairs and
Maintenance Manager 
Revised Timescales: October 2025 
Page 77 of 144

Page 78

Page 78 of 144

Page 79

North Lanarkshire Council
Report
Audit and Scrutiny Panel 
Does this report require to be approved? ☒ Yes   ☐ No
Ref FS/ASP/May25 Date 08/05/25 
Internal Audit Annual Plan 2025-26 
From:  Francis Scott, Chief Officer (Audit and Risk)
E-mail: scottfr@northlan.gov.uk Telephone 07787 914207 
Executive Summary
The purpose of this report is to present the proposed Internal Audit Plan 2025-26 to members
of the Audit and Scrutiny Panel for their consideration and approval.
The report sets out the background and context within which the internal audit planning
process is undertaken and provides a high-level overview of how it is proposed Internal Audit
resources will be allocated in 2025-26.
The Plan follows a well-established planning methodology which is designed to ensure
internal audit coverage of key corporate risks, priorities and projects, governance
arrangements and financial systems. 
Recommendations
The Panel is invited to:
(1) Note the approach adopted to produce the 2025-26 Internal Audit Plan.
(2) Approve the proposed Internal Audit Plan for 2025-26 (at Appendix 1). 
1. Background
1.1 The Global Internal Audit Standards in the UK Public Sector (GIAS (UK Public Sector))
require the Chief Officer (Audit and Risk) to submit an annual Internal Audit Plan to the
Audit and Scrutiny Panel for consideration and approval.  This report outlines the
proposed Internal Audit Plan for North Lanarkshire Council for 2025-26.   
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Item 5
Page 79 of 144

Page 80

2. Report
2.1 Internal Audit is an assurance function whose work is designed to evaluate and improve
the effectiveness of the Council’s risk management, control, and governance processes,
with the aim of providing an independent and objective opinion on the control
environment within the Council.  The annual Internal Audit Plan is designed to assist the
Chief Officer (Audit and Risk) in formulating that opinion.  
2.2 From the 1 April 2025, Internal Audit work will be undertaken in accordance with the
GIAS (UK Public Sector) which includes 15 principles that Internal Audit functions must
follow, covering a range of areas including ethics, professionalism, governance,
management and the performance of Internal Audit services.  Conformance against
these standards is self-assessed on an annual basis, with an independent external
quality assessment being undertaken every five years.  The first external assessment of
the Internal Audit function under the GIAS (UK Public Sector) is scheduled for 2029.
2.3 The purpose, mandate, authority and principal responsibilities of the Council’s Internal
Audit function are set out in the Internal Audit Charter, which is approved by the Panel,
the Chief Executive and the Chief Officer (Finance and Technology), as the Council’s
Section 95 Officer.
2.4 Internal Audit aims to provide a high quality and customer-focused service, which is
responsive and flexible, consistent with best professional practice, focuses on areas that
matter, uses resources efficiently and effectively and is seen by stakeholders as adding
value, providing valuable insights and making a positive contribution to the Council’s
activities.
2.5 Although Internal Audit is a service within the Council, it is operationally independent
which provides a core basis for its work.  Internal Audit’s ongoing independence and
objectivity also forms an important element in ensuring that it can effectively meet
stakeholders’ needs and expectations.  The post of Chief Officer (Audit and Risk) has
sufficient status within the organisation, being a member of both the Business
Management and Corporate Management Teams and reporting directly to the Chief
Executive, to ensure the continuing independence of the Internal Audit service and its
ability to act in accordance with best professional practice free from undue interference
by management and/or senior elected members
The Wider Audit Environment
2.6 The Council’s strategic plan, The Plan for North Lanarkshire, and its associated
Programme of Work to 2028, sets out the Council’s strategic ambitions and the key
activities designed to deliver them, for the Council to address the challenges facing the
people and communities of North Lanarkshire.
2.7 The Council continues to seek to achieve its ambitions against a backdrop of significant
financial pressures, increasing demands for many key services and ever-changing
expectations about how services will be delivered.  The Council also needs to respond
to the impacts on it and its communities of a range of Scottish and UK Government
policies.  There also continue to be significant changes in governance structures and
processes across the Council.  Finally, external events, including the ongoing cost-of-
living crisis and the subdued performance of the UK and Scottish economies as well as
posing immediate challenges to which the Council is responding, also create
considerable additional longer-term risks and uncertainties. 
Planning Considerations
2.8 In developing the Internal Audit Plan, a wide range of factors were considered including
the relative scale, significance and complexity of systems, previous experience of the
relevant control environments, the potential financial, operational and reputational
Page 80 of 144

Page 81

consequences of any significant failures in relevant internal controls and the possible
impact of any failures on the achievement of the Council’s objectives, priorities and
ambitions.
2.9 The Chief Officer (Audit and Risk) also held discussions with the Chief Officers
responsible for each Council Service, to understand the challenges and risks faced in
delivering their services, recent or proposed changes to the operating environment and
any areas across the Council where they felt additional assurance would be required. 
Although senior management were consulted in the development of the plan, the Chief
Officer (Audit and Risk) is solely responsible for determining the content of the Internal
Audit Plan.
2.10 The Plan takes account of the key risks identified by senior management for inclusion on
the Corporate Risk Register, and consideration is also taken of assurance available from
other sources (such as external regulators and selected high-quality relevant internal
sources).
2.11 Internal Audit will continue to work closely with Audit Scotland, the Council’s appointed
external auditors, to ensure that all audit activities are properly coordinated to minimise
any duplication of work. 
Resources
2.12 In 2025-26, approximately 1,130 audit days will be available to undertake the work
included in the Internal Audit Plan.  This allocation is based on a funded budget of 6.5
FTE members of Internal Audit staff and is broadly consistent with the total audit days in
the prior year.
2.13 I am satisfied that the resources available are adequate for the Internal Audit team to
carry out its role effectively.  Should there be a change to these resources during the
year which will impact the completion of the plan, this will be discussed initially with the
Convener and, if necessary, highlighted at the next Panel meeting.
Internal Audit Reporting
2.14 The Internal Audit Plan shows the outputs which members and Chief Officers can expect
from Internal Audit during 2025-26.  Each Internal Audit report will be issued to the
relevant Chief Officer and copied to the Chief Executive and Depute Chief Executive,
highlighting any control weaknesses together with recommendations for improvement. 
Reports on the work of Internal Audit will also be presented regularly during the year to
the Council’s Business and Corporate Management Teams.
2.15 Internal Audit will report progress against the plan during 2025-26 to the Audit and
Scrutiny Panel.  Progress reports will include high-level summary of all audit outputs in
the plan, with full copies of all reports being made available to the Panel.  Where the
Chief Officer (Audit and Risk) considers there are significant matters arising from an audit
report, these will be brought to the Panel’s attention in appropriate detail.  
2.16 The main output of Internal Audit in 2025-26 will be the Internal Audit Annual Report
prepared by the Chief Officer (Audit and Risk), which will include an opinion on the
adequacy and effectiveness of the Council’s control environment.  This report is used to
inform the Council’s Annual Governance Statement which is incorporated into the
Council’s financial statements.   The Internal Audit Annual Report and opinion in relation
to 2025-26 will presented to the Panel in June 2026.
Categories of Work in the 2025-26 Internal Audit Plan
2.17 The proposed Internal Audit Plan for 2025-26 is detailed at Appendix 1, with reference
to entries on the Corporate Risk Register where appropriate.  There are three major
categories of work within the Annual Plan.  These include:
Page 81 of 144

Page 82

• Key Strategic/Corporate Risks – including work on financial sustainability,
strategic governance arrangements, project management, the recently awarded
contracts for housing repairs and roads, information governance and risk
management.
• Financial Management and Key Financial Systems – including work on debtors,
debt recovery, and self-directed support.
• Service/Operational/Programmes of Work – including procurement and contract
management, fleet, homelessness, attendance management, community asset
transfers and community planning.
2.18 The Internal Audit team will continue to support services to ensure management
implement the recommendations arising from audit reports.  Quarterly updates on
management’s progress in implementing High and Medium priority recommendations
will be provided to the Panel.
2.19 The Internal Audit team will also continue to contribute to a wide range of corporate
working groups and Project Boards and be available to provide ad hoc advice and
guidance to Council services and officers.  The team will also provide an internal audit
service to the North Lanarkshire Health and Social Care Integrated Joint Board.
2.20 The GIAS (UK Public Sector) requires that the Internal Audit Plan be kept under review
to reflect any changing priorities and emerging risks relating to the Council’s business,
operations, programmes, systems, and controls.  We will therefore ensure the Plan
remains relevant and reflects any changes to the inherent risks in the Council.  The Audit
and Scrutiny Panel will be advised of any material changes to the Internal Audit Plan
during the year. 
3. Measures of success
3.1 Provision of independent assurance in accordance with the GIAS (UK Public Sector).
3.2 Completion of the planned audit work within 2025-26, in order to provide an annual
opinion on the Council’s control environment.
3.3 Positive assessment of the work of Internal Audit by key stakeholders including senior
management and members of the Audit and Scrutiny Panel. 
4. Supporting Documents
Appendix 1 Proposed Internal Audit Plan 2025-26 
Francis Scott
Chief Officer (Audit and Risk) 
Page 82 of 144

Page 83

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public Sector Equality Duty
and/or Fairer Scotland Duty?
Yes ☐ No ☒
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory considerations
(including employment law considerations), or new legislation)?
Yes ☐ No ☒
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data?  
Yes ☐ No ☒
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital transformation,
service redesign / business change processes, data management, or connectivity / broadband / Wi-
Fi?
Yes ☐ No ☒
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any environmental or
carbon matters?
Yes ☐ No ☒
5.8 Communications impact
Does the report contain any information that has an impact on the council’s communications
activities?
Yes ☐ No ☒
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
Internal Audit forms part of the control framework for the management of several corporate risks
relating to corporate governance issues and these are documented in the relevant corporate risk
‘deep dive’ documents which are subject to periodic review by management.  Operational risks for
the Service itself are documented in the Service’s risk register and are regularly reviewed by the
Chief Officer (Audit and Risk) and the service management team.
5.10 Armed Forces Covenant Duty
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does it relate
to healthcare, housing, or education services for in-Service or ex-Service personnel, or their
families, or widow(er)s)?
Yes              ☐                      No            ☒
Page 83 of 144

Page 84

5.11      Children’s rights and wellbeing impact
Does the report contain any information regarding any council activity, service delivery, policy, or
plan that has an impact on children and young people up to the age of 18, or on a specific group
of these?
Yes ☐         No ☒ 
Page 84 of 144

Page 85

APPENDIX 1 – Internal Audit Plan 2025-26
AUDIT CATEGORY AUDIT SERVICE AREA INDICATIVE
DAYS LINK TO CORPORATE RISK REGISTER
Key Strategic/
Corporate Risks
Risk Management (24/25) Chief Executive 30 Governance, Leadership and Decision Making
Roads Contract (24/25) Community Operations 30 Enterprise Contract Mobilisation
Strategic Governance Arrangements
(24/25) Corporate Review 30 Governance, Leadership and Decision Making
Information Governance (24/25) Finance & Technology 20 Information Security and Governance
Financial Sustainability Finance & Technology 30 Financial Sustainability
Housing Repairs Contract Housing Management 30 Enterprise Contract Mobilisation
Project Management Assets & Procurement 30 Governance, Leadership and Decision Making
Financial Management
& Key Financial
Systems
External Legal Fees Legal & Democratic 25 n/a
Self-Directed Support Adult Social Work 30 Home Support Service Delivery/Sustainability
Debtors Finance & Technology 25 n/a
Debt Recovery Finance & Technology 25 n/a
Service/Operational/
Programmes of Work
Contract Management Compliance
Framework (24/25) Assets & Procurement 20 Procurement Risk
Education Establishment Visits Education 25 Health and Safety
Community Asset Transfers Assets & Procurement 20 Governance, Leadership and Decision Making
Procurement - Compliance Corporate Review 20 Procurement Risk
Procurement - Non-Contract Spend Corporate Review 20 Procurement Risk
PVG Arrangements Education 20 Health and Safety
Attendance Management People Resources 25 Human Resources - Workforce Planning
Leavers Process People Resources 20 Human Resources - Workforce Planning
Fleet Services Community Operations 30 n/a
Traffic Commissioner Report Community Operations 20 n/a
Compliance with Grant Conditions Place 15 n/a
Homelessness Housing Management 30 n/a
Page 85 of 144

Page 86

APPENDIX 1 – Internal Audit Plan 2025-26 
AUDIT CATEGORY AUDIT SERVICE AREA INDICATIVE
DAYS LINK TO CORPORATE RISK REGISTER
Digital NL Process Redesign Strategy and Engagement 25 Governance, Leadership and Decision Making
Community Hub Operating Model Strategy and Engagement 30 Governance, Leadership and Decision Making
NL Community Planning Partnership Strategy and Engagement 30 Governance, Leadership and Decision Making
Contribution to Good
Governance
Assurance Mapping (24/25) Corporate Review 20 Governance, Leadership and Decision Making
Participation in Corporate Working
Groups Corporate Review 30 Governance, Leadership and Decision Making
Ad hoc advice to services Corporate Review 30 Governance, Leadership and Decision Making
Fraud & Irregularity
Review of Anti-Fraud Arrangements
(24/25) Corporate Review 20 Serious Organised Crime, Fraud and
Corruption
National Fraud Initiative n/a 30 Serious Organised Crime, Fraud and
Corruption
Allowance for fraud/irregularity
investigations n/a 65 Serious Organised Crime, Fraud and
Corruption
Audit Committee/
External Audit
Facilitating work of Audit & Scrutiny
Panel n/a 30 Governance, Leadership and Decision Making
Follow-up of IA and EA
recommendations n/a 50 n/a
Follow-up - Audit Scotland/Accounts
Commission National Reports n/a 10 n/a
Liaison with External Audit n/a 5 n/a
Provision of IA Services
to Third Parties
North Lanarkshire Integrated Joint
Board (IJB) n/a 30 n/a
Other
GIAS (UK Public Sector) –
implementation and self-assessment n/a 30 Governance, Leadership and Decision Making
Flexible Capacity n/a 75 n/a
Contingency n/a 50 n/a
TOTAL INDICATIVE AUDIT DAYS 1,130 
Page 86 of 144

Page 87

North Lanarkshire Council
Report
Audit and Scrutiny Panel
Does this report require to be approved? ☐ Yes   ☒ No
Ref FS/LM/ASP/May 2025    Date 08/05/25
Internal Audit: Follow-up of implementation of audit
recommendations 
From  Francis Scott, Chief Officer (Audit and Risk)
E-mail ScottFr@northlan.gov.uk Telephone 07887 914207 
Executive Summary
The purpose of this report is to update the Panel on the progress made by management in
the implementation of Internal and External Audit recommendations.
In the period to 31 March 2025, of the 32 High and Medium priority recommendations that
were due, 15 have been fully implemented and three have been deemed as no longer
relevant.  Of the 14 recommendations that remain outstanding, five have an implementation
date which is more than 12 months overdue.
Since April 2021, 94% of all relevant audit recommendations have been satisfactorily
implemented by Services, meaning that only 6% of these audit recommendations remain
outstanding.
In respect of recommendations from External Audit reports, four of the 14 agreed actions
have been completed, two are partially implemented and eight are not yet due.
Recommendations
The Panel is invited to:
(a) Note the contents of this report.
(b) Consider whether there are any issues arising from this report on which they wish to
receive further information from relevant management.
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work All Programmes of Work
Item 6
Page 87 of 144

Page 88

1. Background
1.1 This report presents an overview of the progress of all High and Medium priority Internal
Audit recommendations in the period to 31 March 2025.  
1.2 This report also provides an update on progress made in addressing recommendations
arising from External Audit reports issued as part of the 2022-23 and 2023-24 audits.
1.3 The updates from management on progress to date have been verified on a sample
basis by Internal Audit as part of the preparation of this report.  However, it should be
noted that this review has focused on whether planned actions have been completed
and has not included detailed substantive testing of whether the implemented actions
have been effective in addressing previously identified weaknesses. 
2. Report
Internal Audit recommendations
2.1 Table 1 below summarises the progress of all High and Medium priority
recommendations which were due to be completed in the period to 31 March 2025. 
Overall, 15 of the agreed actions have been completed, three have been deemed as
no longer relevant and 14 remain outstanding.
Table 1
Completed No Longer
Relevant Outstanding Total
Chief Officer Area
Asset and Procurement 2 0 0 2
Audit and Risk 0 1 0 1
Community Operations 1 0 0 1
Education and Families 5 0 9 14
Finance 4 0 0 4
People Resources 3 2 4 9
Place 0 0 1 1
TOTAL 15 3 14 32
2.2 At the Panel meeting in October 2024, members requested that this report should
clearly identify recommendations which were previously reported as partially
implemented but have now been assessed as fully complete.  Since the last Panel
meeting in February, there have been six such actions and detail in respect of these is
included at Appendix 1 (referenced 1.1–1.6). 
2.3 The three recommendations assessed as no longer relevant relate to the following
audits: 
• Review of the Council’s Counter Fraud Arrangements. 
• ESC: Testing of Selected Key Controls. 
• Use of Teaching Supply Staff. 
For each of these recommendations, the appropriate Chief Officer has advised that
they accept the risk and have transferred the action onto the Service Risk Register,
where it will thereafter be tracked and monitored. Internal Audit have confirmed that
these are now included on the Services’ Risk Registers.  Details of these
recommendations are referenced 1.7–1.9 in Appendix 1.
Page 88 of 144

Page 89

2.4 For the 14 outstanding recommendations, revised implementation dates have been
agreed.  Appendix 2 provides detail of these recommendations with an update on
progress provided by service management. 
2.5 Appendix 2 also references instances where the original implementation date of a
recommendation was more than 12 months overdue.  In this period there are five such
actions, referenced 2.1–2.5 in the appendix.  Relevant Chief Officers have been invited
to attend the Panel meeting to provide explanations. 
2.6 As at 31 March 2025, 94% of all relevant audit recommendations, where the original
agreed implementation date was either due or had passed, have been fully
implemented by Services, meaning that the percentage overall of all audit
recommendations made since April 2021, which remain outstanding, is 6%.  This
highlights an improvement since the last period when 92% were complete and 8% were
outstanding.   
External Audit recommendations
2.7 Table 2 shows the status of actions agreed by management in response to External
Audit reports issued as part of the 2022-23 and 2023-24 audits. As at 31 March 2025,
four of these recommendations are complete, two are partially implemented and eight
are not yet due.
Table 2
Completed Partially
implemented Not yet due Total
Report Title
2022-23
Annual Report 2021/22 1 2 0 3
Best Value Thematic
Report 3 0 0 3
2023-24
Annual Report 0 0 5 5
Best Value Thematic
Report 0 0 3 3
TOTAL 4 2 8 14 
2.8 A six-monthly tracking report of progress in implementing these recommendations is
included at Appendix 3.   
3. Measures of success
3.1  Internal Audit reports each cycle to the Audit and Scrutiny Panel on the progress made
by management in implementing actions in response to Internal and External Audit
reports.    
Page 89 of 144

Page 90

4. Supporting documentation
Appendix 1 Internal Audit recommendations previously reported as outstanding,
now complete
Appendix 2 Outstanding Internal Audit recommendations 
Appendix 3  External Audit recommendations 
Francis Scott, Chief Officer (Audit and Risk) 
Page 90 of 144

Page 91

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact because of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a summary of the key risks and potential impacts, highlighting
where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project
Risk Registers), and how they are managed?
Failure by Services to address previously identified issues and/or weaknesses will
impact on the effectiveness of the relevant control framework.  This, depending on
the nature of the issue, will be captured and should be reflected in the relevant
service risk register or the corporate risk register (as appropriate).
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ Page 91 of 144

Page 92

APPENDIX 1 – Internal Audit recommendations previously reported as outstanding, now complete
Ref. Report
Details Recommendation Original & revised
due dates
1.1 Chief Officer
(Asset and
Procurement)
Contract
Management
(April 2023)
The Chief Officer (Asset and Procurement) should ensure that:
(1) all Chief Officers are reminded of the need to nominate appropriately
skilled/experienced officers as contract owners and ensure that
such staff are made aware as soon as possible of the C&SM
guidance and the responsibilities and corporate expectations placed
on them when undertaking such a role.
(2) the eLearning modules and associated training continue to be
developed in accordance with the expected timescales and
consideration is given to the need for specific mandatory training on
the corporate C&SM guidance for those nominated as Contract
Owners; and
(3) the C&SM guidance is subject to periodic review to ensure that it
continues to be adequate and reflects current corporate
expectations in relation to C&SM activity across the Council.
Priority: Medium
December 2023
June 2024
March 2025
1.2 Chief Officer
(Asset and
Procurement)
Procurement –
Achieving Best
Value
(June 2023)
The Chief Officer (Asset and Procurement) should consider and identify
a condensed suite of indicators which would allow for the measurement,
analysis and reporting of all procurement activity notified to the CPT
including relevant indicators to capture procurement exercises which
did/did not involve competition and ensure that this is subject to regular
review to identify any trends and/or potential issues within particular
sectors and/or goods/services, investigate the reasons for these and take
appropriate action to resolve.
Priority: Medium
April 2024
March 2025
1.3 Chief Officer
(People
Resources)
Corporate
Governance
Principles C & D
(May 2023)
The Chief Officer (People Resources) should ensure that appropriate
arrangements are put in place to allow for key HR related documents
referenced in the finding above to be reviewed/refreshed and
communicated to staff and that these are monitored to ensure revised
timescales are achieved.
Priority: Medium
September 2023
December 2023
March 2024
September 2024
March 2025 
1.4 Chief Officer
(People
Resources)
Payments to
Staff Additional
Non-Standard
Payments
(October 2023) 
(1) The Chief Officer (Education – South), in conjunction with the Chief
Officer (People Resources) should undertake a review to identify
staff who regularly receive casual worker payments to ensure that
they have an appropriate casual worker post set up on iTrent and a
current Casual Worker Agreement in place.  Where no post and/or
agreement exists, appropriate action should be taken to correct this.
(2) The Chief Officer (People Resources) should:
• Consider whether the review recommended at (1) above needs
to be extended to other Service areas, facilitating this as
appropriate.
• Consider whether an exception report can be devised to
capture instances where casual worker payments are being
made to staff without a casual worker post set up in iTrent
and/or a Casual Worker Agreement in place to enable
monitoring, identification and prompt action to correct this; and
• Remind casual workers, and managers authorising claims, of
the requirement to ensure that casual worker payments are only
allocated to their casual worker post.
Priority: Medium
January 2024 
July 2024
March 2025 
Page 92 of 144

Page 93

Ref. Report
Details Recommendation Original & revised
due dates
1.5 Chief Officer
(People
Resources)
Payroll: Follow-
up of Overtime
Duplicate
Payments
(August 2024)
The Chief Officer (People Resources) should ensure that: 
(1) As a priority, a robust mechanism is developed and implemented
to identify, and hold to account, any managers who are continually
authorising duplicate claims and are therefore failing to properly
and effectively discharge the delegated financial authority assigned
to them.  
This should include, but not be limited to, the need for completion
of the Time and Expenses training to be made a mandatory
requirement for authorising managers; reporting instances of
authorising duplicate claims to the relevant Chief Officer and
devising a process whereby continual dereliction of duties results
in consideration of appropriate formal action; and
(2) Regular reports detailing instances of recurring non-compliance of
both submission and authorisation of duplicate claims are
introduced and circulated to both People Resources management
and relevant Chief Officer
Priority: High
December 2024
April 2025 
1.6 Chief Officer
(People
Resources)
Payroll: Follow-
up of Overtime
Duplicate
Payments
(August 2024)
The Chief Officer (People Resources) should ensure that guidance and
training provided to both employees and managers provides clear and
explicit instruction on the key expectations regarding the completion and
review of overtime claims, including those listed in the finding above.
Priority: High
October 2024
February 2025 
1.7 Chief Officer
(Audit and
Risk)
Review of the
Council’s
Counter Fraud
Arrangements
(August 2023)
The Chief Officer (Audit and Risk) should:
(1) Review and consider the benefits of identifying and undertaking
more proactive work in relation to fraud and irregularity by assessing
the level of fraud risk and identifying service areas where proactive
fraud work could potentially lead to financial savings for the Council.
(2) Consider whether there is a need for a dedicated, appropriately
qualified and experienced staff resource to undertake such work. 
This may include discussions with other Councils who already have
such a resource to identify potential areas of work, and the cost and
benefits involved.
(3) Prepare an annual counter fraud plan which outlines the fraud work
to be undertaken throughout the year and an annual counter fraud
report which details the success and outcomes of the Counter Fraud
Policy, including the levels of fraud reported, fraud work undertaken,
analysis of statistics in relation to fraud activity and outcomes,
publication of successful outcomes and future plans for undertaking
fraud work.
Priority: Medium
This recommendation has been closed without being fully
implemented.  The Chief Officer responsible has advised they have
accepted this risk, which will be tracked and monitored through
service risk register.
April 2024
March 2025
Page 93 of 144

Page 94

Ref. Report
Details Recommendation Original & revised
due dates
1.8 Chief Officer
(People
Resources)
ESC: Testing of
Selected Key
Controls
(March 2022)
The Head of People and Organisational Development should ensure that
HR Business Partners, in conjunction with service management, review
how non-core hours have been calculated for all relevant employees in
receipt of a standing non-core hours payment each pay period to ensure
that these are accurate and consistent with the employee's work
pattern/rota and Schedule A.
Priority: Medium
This recommendation has been closed without being fully
implemented.  The Chief Officer responsible has advised they have
accepted this risk, which will be tracked and monitored through
service risk register.
December 2022
March 2023
December 2024
March 2025
1.9 Chief Officer
(People
Resources)
Supply
Teachers
(January 2023) 
People Resources, in conjunction with Education and Families, should: 
(1) Prepare and issue documented guidance providing clear definitions
of short and long-term supply teachers and outlining the
responsibilities and required actions of Headteachers in relation to
supply teachers.
(2) Finalise and implement the proposed processes for the management
of short-term supply teachers as highlighted in the finding (i.e.
notification of engagements and the Supply Register) and ensure
that a formal review of the adequacy and effectiveness of these
processes is undertaken, after a sufficient period of time, to assess
how well they are operating, identifying and taking any necessary
improvement actions as appropriate. 
Priority: High
This recommendation has been closed without being fully
implemented.  The Chief Officer responsible has advised they have
accepted this risk, which will be tracked and monitored through
service risk register.
August 2023
June 2024
February 2025 
Page 94 of 144

Page 95

APPENDIX 2 – Outstanding Internal Audit recommendations  
Ref.  Report Details Recommendation Original & revised
timescales Management update
2.1 Chief Officer
(Community
Operations)
Chief Officer
(People
Resources)
Follow-up of
Investigation of
Staffing Issues
within Waste and
Fleet Resources
(July 2023)
(1) ensure that HR Business Partners, prior to authorising and
passing higher duties claims for payment, properly scrutinise and
understand the appropriateness of such claims, confirm that
claims have been agreed and authorised by the Chief Officer or
senior management and ensure that documentation accurately
reflects the reason for such payments.
(2) review, and take appropriate action, to resolve the issues and
errors in contractual and non-contractual payments identified by
Internal Audit and outlined in the document which has been
provided under separate cover.
(3) identify other employees who may be affected by the issues
identified in the finding above, with a view to review and taking
appropriate action to resolve any subsequent issues/errors
identified; and
(4) ensure that where overpayments arise from these reviews,
prompt action is taken to ensure that appropriate repayment
schedules, with reasonable terms, are promptly agreed with
relevant employees and that recovery commences as soon as
possible.
Priority: High
September 2023
December 2023
June 2024
September 2024
November 2024
February 2025
May 2025 
(>12 months
overdue) 
Requests for higher duties claims are authorised by the
Business Manager, Chief Officer and HR Business Partner to
ensure all such claims have been properly scrutinised and
appropriately authorised.
A review of the contractual and non-contractual payments has
been completed, and appropriate action is being and/or will be
taken to resolve the issues and errors in these payments as
identified both by Internal Audit and during the aforementioned
review.  
Work has been concluded in this area to ensure that anyone
who has not been paid correctly has now been paid correctly.
Any underpayments identified will be calculated and paid to the
affected employees.  A report is being submitted to the next
meeting of the BMT in May 2025 seeking approval to stop
recovery of the overpayments identified.   
Page 95 of 144

Page 96

Ref.  Report Details Recommendation Original & revised
timescales Management update 
2.2 Chief Officer
(People
Resources)
Payments to Staff
(Regularity):
Additional Non-
Standard
Payments
(October 2023)
The Chief Officer (People Resources) should undertake a review of
current element codes to:
(1) determine the need for each code based on the Council’s terms
and conditions, removing any which are unnecessary and provide
a clear explanation of each code remaining to ensure that staff
and managers understand the purpose of each code; and
(2) restrict the codes available to individual employees so that they
are only able to select codes which are relevant to their post.
Priority: Medium
January 2024
December 2024
April 2025
May 2025 
(>12 months
overdue) 
A report has been created which identifies three batches of
payroll elements:
(a) Elements which migrated from Cyborg to iTrent and are on
‘pick lists’ but have never been used.  These can be deleted
from the system.
(b) Elements that have been previously used against employee
records but have not been used in over three years.  While
these cannot be deleted, due to historic data being attached
to them, they can be hidden from the ‘pick list’ and added
back if they are ever needed in the future.
(c) Elements that are currently in use. An exercise will be
undertaken to review and rename these and make the
element descriptors clearer, so that people will have more
clarity on which element to select and claim for. The
Systems and Analytics Manager will also look to change the
claim form role profile for Education and Families.  If they
have their own claim form, and elements on this form, this
will significantly reduce the number of elements on the ‘pick
list’ that other Services can see.
Work will be allocated to the Systems and Analytics Team to
carry out the above.  Thereafter, communications and
engagement will be needed to share the newly named element
codes.
2.3 Chief Officer
(Education and
Families)
School G –
Potential
Irregularity
(March 2024)
Education and Families should ensure that the Head Teacher of School
G liaises with the Treasury Management section with a view to
arranging for the school fund bank account currently being used to be
closed and the monies transferred to the NLC school fund bank account
held for School G.
Priority: High
March 2024
October 2024
March 2025
May 2025 
(>12 months
overdue) 
The Head Teacher has met with colleagues from Treasury
Management, and they have provided advice and guidance on
how to close the associated bank account.  
The Head Teacher has advised that the majority of funds have
been transferred to the NLC school fund bank account held but
there remains some cheques which have not yet been cashed.  
Once received, the March 2025 bank statement will be reviewed
to determine if the cheques are cashed and identify any
resultant action that needs to be taken to close the account.
Page 96 of 144

Page 97

Ref.  Report Details Recommendation Original & revised
timescales Management update
2.4 Chief Officer
(Education and
Families)
School Excursions
(October 2023)
The Chief Officers of Education and Families (North and South) should
ensure that:
(1) A comprehensive formal review of both the Council’s Educational
Excursions and Outdoor Activities Policy and the Risk Assessment
Guidance on Educational Excursions and Outdoor Activities is
undertaken to revisit and refresh all aspects of these documents
with a view to improving the robustness of the Council’s
arrangements associated with school trips and excursions.  This
should take account of, but not limited to, the information contained
in Appendix 2 and the need for roles and responsibilities of all
relevant parties, including those within other Council services to be
clearly documented in the revised guidance.
(2) Any revised arrangements are fully communicated to all Council
Services with a role in the process.
(3) They explore how best to gather/record details of all school trips
and excursions and thereafter monitor compliance with the
Council’s expected arrangements associated with such trips and
excursions.
Category: High
April 2024
March 2025
September 2025 
(>12 months
overdue) 
The Service has critically reviewed the key areas of work in
conjunction with available staff resources.  At this time the
following operational activity is being prioritised by the Service
through to June 2025:
(a) Preparation of a new DSM scheme
(b) Preparation of an ASN business case
(c) Development of resilience, business continuity and risk
management plans
(d) Transfer of school transport activity to Community
Operations
In light of the above, the review of the School Excursions Policy
will begin during Summer 2025 with engagement with the Head
Teachers on the draft revised Policy commencing in August
2025.
In the interim, best practice advice will continue to be given to
schools based on the existing policy.
Page 97 of 144

Page 98

Ref.  Report Details Recommendation Original & revised
timescales Management update
2.5 Chief Officer
(Education and
Families)
School Excursions
(October 2023)
The Chief Officers of Education and Families (North and South) should:
(1) as part of the formal review referenced at Action Plan point 1 above,
ensure that this includes the creation of a dedicated section within
the policy and/or associated procedures which outlines clear
expectations around the financial aspects associated with the
organisation and execution of trips.  This should include, but not be
limited to:
(a) A clear and detailed protocol for booking trips where a travel
company/tour operator is not going to be used ensuring
arrangements minimise the risks associated with such
payments and ensure that the use of personal credit cards to
book trips is prohibited.
(b) Consideration to promoting iPay Impact as the primary means
for collecting monies in schools thus reducing cash payments
and the subsequent flow of physical cash in the school.
(c) Determining the additional checks/monitoring that need to be
carried out at establishment level to ensure all monies due are
received and duly banked in line with Council policy.
(d) clear guidance on the levels of physical cash that can/should
be taken on a trip/excursion, the required records to be
completed and documentary evidence required/expected to
support any such spend.
Category: High
April 2024
March 2025
September 2025 
(>12 months
overdue) 
The Service has critically reviewed the key areas of work in
conjunction with available staff resources.  At this time the
following operational activity is being prioritised by the Service
through to June 2025:
(a) Preparation of a new DSM scheme
(b) Preparation of an ASN business case
(c) Development of resilience, business continuity and risk
management plans
(d) Transfer of school transport activity to Community
Operations
In light of the above, the review of the School Excursions Policy
will begin during Summer 2025 with engagement with the Head
Teachers on the draft revised Policy commencing in August
2025.
In the interim, best practice advice will continue to be given to
schools based on the existing policy.
Page 98 of 144

Page 99

Ref.  Report Details Recommendation Original & revised
timescales Management update
2.6 Chief Officer
(Education and
Families)
School E – School
Fund and General
Issues
(January 2024)
The Chief Officer of Education and Families (North) should:
(1) ensure current signatories in place for all school funds are
reviewed to determine whether these are appropriate, agree with
the list of signatories held by the Treasury Management section
and ensure that any resultant necessary changes are actioned
promptly
(2) collate a list of the safe/other secure facility held at each
educational establishment and thereafter pass the details to the
Insurance section enabling them to determine and advise of the
level of insurance cover provided for each establishment; and
(3) review which schools have charitable status activities; whether
this is still required and, if so, that they have been made aware of
the expected governance arrangements (rules, regulations and
processes etc.) to be followed to comply with statutory/OSCR
expectations.
Priority: Medium
June 2024
December 2024
March 2025
May 2025
At a briefing session in March 2025, Head Teachers were
advised of the information which they were required to submit. 
A pro-forma was prepared and issued to the Head Teachers
with a return date of 31 March 2025.
A summary report on the returns will be taken to the Service
SMT meeting on 30 April 2024.
Detail from the returns should enable each of the
recommendations to be actioned and it is anticipated that all
parts of the recommendation will be implemented by the
revised implementation date (May 2025). 
2.7 Chief Officer
(Place)
Creditors
(April 2024)
The Chief Officer (Place) should ensure that, as a matter of urgency,
the solution for an interface between PECOS and eFinancials is
finalised and implemented.  This should include ensuring that user
acceptance testing is satisfactorily completed, and that staff involved
in raising and approving and matching PECOS orders/invoices are
provided with appropriate training prior to implementation.
Priority: High
September 2024 
November 2024
February 2025
May 2025 
A training module has been developed and delivered to staff
involved in raising, approving and matching PECOS orders and
invoices. The interface between PECOs and eFinancials has
been fully acceptance tested and signed off, and the interface
went live on 14 April 2025. However, a minor technical issue
has been identified which is affecting the processing of invoices
and thus the end-to-end process is not currently fully
operational.  The contractor is working on fixing the issue which
is expected to be imminent. In the meantime, Creditors staff
have invoked their business continuity arrangements and have
temporarily adopted a manual process. 
2.8 Chief Officer
(Education and
Families)
Compliance with
Establishment
Fund
Arrangements
(October 2024) 
The Chief Officers (Education and Families - North and South) should
determine, and formally document, the frequency and content (i.e. level
of returns submitted by establishments and results of compliance
checks undertaken including issues identified, proposed actions and
progress to address issues) of information which requires to be
provided to Service management with regards the establishment fund
Compliance Framework.
Priority: Medium
December 2024
March 2025
May 2025
A report was prepared and submitted to SMT in March 2025. 
This highlighted the level of annual Compliance Checklist
returns submitted by establishments for the year 2023-24 and
the work to date in reviewing Establishment Fund practices. 
Action will now be taken to review and update the
Establishment Fund Compliance Framework and formally
document arrangements for reporting to SMT on compliance,
in line with the audit recommendation and agreed management
response.
Page 99 of 144

Page 100

Ref.  Report Details Recommendation Original & revised
timescales Management update
2.9 Chief Officer
(Education and
Families)
Compliance with
Establishment
Fund
Arrangements
(October 2024)
The Chief Officers (Education and Families – North and South) should
ensure that action is taken to further develop each of the five
components within the Compliance Framework for the Service to
ensure compliance on the operation and management of Establishment
Funds across educational establishments.  This should include, but is
not limited to, specific detail and/or guidance regarding the following:
(1) who will monitor submission of returns by Heads of Establishment
and recording and tracking of this.
(2) the initial checks required to be undertaken on these submissions,
by whom and the recording of the outcome.
(3) determination of a proportionate risk-based programme which
clearly documents how the Service will identify and thereafter
undertake targeted sample checks at establishments to verify
compliance with the Educational Establishment Fund Procedures;
and
(4) the protocol for action to be taken on those establishments who
have either not returned the required documentation (either in full
or in part) or where issues/areas of non-compliance have been
identified with the documentation submitted.
Priority: High
December 2024
March 2025
May 2025 
A report was prepared and submitted to SMT in March 2025. 
This highlighted the level of annual Compliance Checklist
returns submitted by establishments for the year 2023-24 and
the work to date in reviewing Establishment Fund practices. 
Action will now be taken to review and develop/update the
Establishment Fund Compliance Framework in line with the
audit recommendation and agreed management response.
2.10 Chief Officer
(Education and
Families)
School H – School
Funds
(December 2024)
Education and Families should ensure that, as a matter of urgency,
liaise with the Bank of Scotland to establish the current balance and a
list of any transactions from February 2020 to date for both the Primary
School and Nursery accounts.  Once established, arrangements should
be made for any balance remaining to be transferred to the current bank
account for the school and nursery and these ‘old’ accounts closed.
Priority: High
December 2024
May 2025
Discussions are currently ongoing with the Bank of Scotland to
identify a process which will allow the school to access funds
held as the authorised signatories held by the bank are no
longer in post in the school.
2.11 Chief Officer
(People
Resources)
Payroll: Follow-up
of Overtime
Duplicate
Payments
(August 2024)
The Chief Officer (People Resources) should ensure that: 
(1) A formal plan, detailing the action required to be taken to agree and
recover the previously identified overpayments and the associated
timescales and responsible officers, is prepared and progress
thereafter monitored; and
(2) Appropriate and timely action is thereafter taken to recover the
overpayments referenced at recommendation (1) above, with
regular updates on the status of the recovery of these
overpayments provided to Senior Management.
Priority: Medium
December 2024
March 2025
May 2025 
When work commenced in this area in January, calculations
undertaken uncovered some discrepancies which required to be
investigated and considered.  The payroll team have reported
that the work is extremely time consuming and cannot be
accommodated during the normal working day due to the
complex nature of these overpayments.
A report is being submitted to the next meeting of the BMT in
May 2025 seeking approval to stop recovery of the
overpayments identified.   
Page 100 of 144

Page 101

Ref.  Report Details Recommendation Original & revised
timescales Management update
2.12 Chief Officer
(Education and
Families)
Devolved School
Management
(January 2025)
The Chief Officer (Education South) should continue to develop and
update the contract register to ensure that this provides a
comprehensive list of all contracted suppliers which are permitted for
use by the Service.
Priority: High
January 2025
May 2025
The contract register will be further developed and updated in
line with the audit recommendation thus ensuring that it provides
a comprehensive list of all contracted suppliers permitted for use
by the Service.
2.13 Chief Officer
(Education and
Families)
Devolved School
Management
(January 2025)
The Chief Officer (Education South) should ensure that spend analysis
reports are produced and reviewed on a regular basis to enable
identification of procurement opportunities.  This should include an
analysis and identification of instances where aggregated spend across
the Service with individual suppliers exceeds procurement thresholds
detailed in the GCSOs to ensure appropriate action is taken promptly.
Priority: High
February 2025
May 2025
Purchasing/procurement update reports are submitted on a
monthly cycle to Service SMT/Resources meetings. However,
while these reports include the procurement spend information
referenced, there is still further work required to be undertaken
to fully implement the recommendation.
2.14 Chief Officer
(People
Resources)
Payroll: Follow-up
of Overtime
Duplicate
Payments
(August 2024)
The Chief Officer (People Resources) should ensure that a review is
undertaken, after a sufficient period to allow arrangements to become
embedded, to determine the adequacy and effectiveness of the
processes in place to monitor and address those cases where
employees repeatedly submit duplicate claims, with amendments made
as necessary.
Priority: High
March 2025
December 2025
There is now a Duplicate Claims Protocol in place which clearly
outlines the process that will be followed for both employees
who submit duplicate claims and managers who authorise
them.
Once this protocol has had time to embed, it will be reviewed
and assessed to determine the adequacy and effectiveness of
the processes put in place. 
Page 101 of 144

Page 102

APPENDIX 3 – External Audit recommendations
Ref Recommendation Agreed Management Action Responsible
Officer Due Date Update
2022/23 – Annual Report
3.1 Land and Buildings Valuations
The Council should continue to consider its
approach to the valuation of land and
buildings going forward and continue to
ensure this is appropriate to assess whether
asset values have moved materially in year
and as at 31 March. The Council should work
with its valuers to ensure valuations are in
accordance with accounting code
requirements. Appropriate scrutiny of the
valuation work completed should be
undertaken to ensure these are consistent
with the Council’s records. 
The Council will continue to review its
revaluation policy in line with code
requirements and in conjunction with the
professional valuers. This will take
cognisance of the recommended
actions from the Audit Scotland round
table discussion including that ‘where
the valuation exercise is carried out in-
year but earlier than 31 March for
reasons of expediency, any material
changes in value in the interim should
be adjusted for’. The Council will give full
consideration to the practicalities of
undertaking valuations at 31 March to
ensure this will not impact the annual
statutory requirement to submit the
unaudited accounts by 30 June. The
Council will also continue to assess
whether there is a material difference
between the carrying value in the fixed
asset register and current value, and
ensure the accounts are code
compliant.
Chief Officer
(Finance) 
Chief Officer
(Asset and
Procurement)
June 2024 
June 2025
Partially implemented 
Asset and Procurement - In conjunction with Finance, we
continue to review the valuation date for our property
assets. Arrangements are in place to meet the code
requirements at this time. 
Finance - In collaboration with the Council valuers, for
2023/24 (and also for 2024/25) it was agreed that moving
the valuation date to 31 January was realistic and
achievable. This will be kept under continual review taking
into consideration the practicalities and impacts of moving
to a 31 March valuation date on the process of production
of the unaudited accounts. Any material changes in value
between 1 February and 31 March will be assessed and
adjusted for, as appropriate. 
In addition, a policy has been agreed to ensure a
representative sample of 20% across all asset categories
are valued, to ensure that all asset classes are revalued
every year to help ensure the carrying amount of each
class is not materially different from current value at the
year-end. 
A revised process has also been established to assess
whether the values of all other land and buildings assets,
regardless of whether or not they were subject to valuation
during the year, have materially changed, to ensure that
the balance sheet shows a fair representation of the
position as at 31 March. As valuations include estimations
e.g. market values and rebuild costs, it has been
determined by the Council’s valuers that valuations may
be subject to a margin of error. Therefore, subject to that
margin of error estimated, asset valuations undertaken will
be reviewed to determine whether there is a material
change in the carrying values for any asset class. If so,
additional valuations will be requested and if material will
be incorporated into the audited accounts.  This process
will continue to be reviewed. Page 102 of 144

Page 103

Ref Recommendation Agreed Management Action Responsible
Officer Due Date Update
3.2 Capital Processes
The Council should review a number of its
capital processes to ensure the value of
assets is correctly held in the accounts,
including: 
•The Council should review the revaluations
provided by its valuers to ensure all assets
have been included. 
• The Council should review its capital
impairment process to ensure it is robust
enough to identify potential indicators of
impairment across all assets. 
• The Council should also consider how
assets are held on its fixed asset register to
ensure compliance with the
componentisation requirements of the Code. 
The Council will: 
• review the revaluation practices to
ensure all relevant assets are
incorporated 
• review the process of identifying
impairments to ensure all assets are
considered 
• review and consider how assets are
held on its fixed asset register to
ensure full compliance with the
componentisation aspects of the code 
Chief Officer
(Finance) 
Chief Officer
(Asset and
Procurement)
June 2024 
June 2025
Partially implemented.
Asset and Procurement 
In conjunction with Finance:
• Complete - the fixed asset register has been reviewed to
ensure it reflects all property assets. 
• Complete - any impairments are considered as part of
the valuations process. 
• In progress – consideration of componentisation is part
of the valuation exercise and remains under review.   
Finance 
• Complete - reviews are undertaken of Fixed Asset
Register (FAR) when selecting the representative
sample of 20% across all asset categories to ensure that
all assets that required to be incorporated (e.g. last
valuation was 5 years ago etc) are included in the
valuation programme.
• Complete - a revised process has been established.  A
list of all assets within the FAR is provided to Chief
Officers as part of the year-end exercise to ensure full
consideration of assets within service.
• In Progress - the Council continues to assess
compliance with the code in respect of
componentisation, in line with previous practice.   This
will remain under continual review and if deemed
necessary to record individual components of more
material assets, this will be discussed and agreed
internally and with external audit.  This is a more
complex method of recording and would make valuation
more complex too.  This would also potentially require a
significant increase in work across Finance, Assets &
Procurement and the Council valuers, should it be
deemed necessary, and would take time to implement.
This is being reviewed by the relevant parties to
determine the practicalities, implications, resource
requirements and timescales to implement such
changes if required. 
Page 103 of 144

Page 104

Ref Recommendation Agreed Management Action Responsible
Officer Due Date Update
3.3 Significant Trading Operation
The Council should review the trading
operation to examine the cost effectiveness
of the service provided to ensure that it
continues to represent best value for the
Council. 
As currently presented the Trading
Account shows a rolling three-year
deficit. However, this performance
incorporates non-cash adjustments for
Employee Benefits. Following the same
accounting treatment as Council, these
costs would be reversed back out
resulting in a cumulative three-year
surplus being reported, demonstrating
continued value for money in the
operation of the Council's Trading
Account. The Council will seek to amend
the presentation of the Trading Account
note for the 2023/24 annual accounts to
reflect the cash and non-cash elements
of Trading Account operations.
Chief Officer
(Finance)
June 2024 Complete.  Reported to Panel in August 2024.
2022/23 – Best Value Thematic Report
3.4 Involvement of Members in Strategic
Planning
The Council should look to improve its
existing processes for engaging elected
members on the overall strategic planning
process. 
As part of its scheduled annual review,
we will refresh the narrative presently
contained within the Strategic Policy
Framework in respect of elected
members’ strategic planning role and
will thereafter emphasise through the
CMT and Community Co-ordinator role
the importance of engaging elected
members on the strategic elements of
the integrated Programme of Work
Delivery Plan. Elected member role in
strategic planning to also be clearly
documented in the developing
Programme of Work Governance
Framework.
Chief Officer
(Business and
Digital)
September
2024
Complete.  Reported to Panel in November 2024.
3.5 Engagement with Communities
The Council should consider how it measures
the level of engagement with communities
and equalities groups.   
This will be aligned with actions arising
from new communication strategy to be
considered by council in March 2024.
The strategy will also define what is
meant by seldom-heard communities
and groups.
Chief Officer
(Strategic
Communication
and
Engagement)
March 2024 Complete. Reported to Panel in August 2024.
Page 104 of 144

Page 105

Ref Recommendation Agreed Management Action Responsible
Officer Due Date Update
3.6 Elected Members Training and
Development Programme
The Council should work with members to
understand the reasons for the poor
attendance to ensure its training and
development programme is fit for purpose.   
The number of attendees at
development sessions has been low,
however there has been a slight
increase in numbers attending recent
events.  The Talent and Organisational
Development Team will continue to
communicate regularly with Political
Group Business Managers to
encourage discussions around training,
low attendance and engagement to be
included on business meeting agendas. 
A survey will be sent to all Elected
Members to help identify any restrictions
and reason for low attendance. 
Development of the Elected Members
area on LearnNL will continue, with all
development session recordings and
presentation slides being uploaded for
members to access at any time.  A
monthly communication is sent to all
Elected Members with direct links to
new recorded sessions.
Chief Officer
(People
Resources)
November
2023
Complete. Reported to Panel in February 2024.
2023/24 – Annual Report 
3.7 Replacement of Assets
Management should establish a process to
ensure assets replaced are appropriately
removed from the asset register and
accounted for as a disposal appropriately.   
In the absence of componentisation, it is
unclear as to how we can put in place a
process to remove the value of elements
of assets which have been replaced.
However, we will commit to a review of
expectations around componentisation
with a view to future discussions with
External Audit.
Chief Officer
(Finance)
June 2025 Not yet due. Position as at March 2025.
The wider requirements of possible implementation of
componentisation requirements is being reviewed by
Finance, Asset and Procurement and the Council’s
valuers.  In the interim, the annual capitalisation process
has been amended to request services to identify where
capital works involve the replacement of major
components to enable appropriate removal/disposal of
replaced components where possible.
Page 105 of 144

Page 106

Ref Recommendation Agreed Management Action Responsible
Officer Due Date Update
3.8 Statutory Override
The Council should proactively work with
CIPFA and the wider local government sector
to arrive at appropriate solution for the
implementation of accounting for
infrastructure assets. 
The Council will work with CIPFA and
the wider Local Government sector as
appropriate to inform a decision on the
accounting treatment for infrastructure
assets.
Chief Officer
(Finance)
Ongoing Ongoing.
CIPFA/LASAAC issued a consultation for the 2025/26
accounting code which includes the proposal to extending
the statutory override within the UK.  The formal
notification that this override has been agreed and
extended is still to be confirmed with a revised statutory
prescription via a SG Finance Circular announcement.
3.9 Reinforced Autoclave Aerated Concrete
(RAAC)
For those properties where RAAC was
confirmed, the Council should determine a
more accurate measure of the level, of
impairment in line with the requirement of
accounting standards. 
Further engagement with the Council’s
valuers is required to determine an
appropriate methodology, subject to full
investigation being carried out to
determine the extent of costs/remedial
works required.
Chief Officer
(Finance) 
Chief Officer
(Asset and
Procurement)
June 2025 Not yet due. Position as at March 2025:
Asset and Procurement - In conjunction with Finance, the
valuation team are provided with indicative costs to repair
RAAC to allow them to consider the financial impact of
RAAC which is reflected in the asset valuation.
Finance – For the 24/25 valuation programme, all Council
assets affected by RAAC are being formally revalued, to
incorporate all current information and decisions of
planned actions including remediation, demolition etc and
the estimated costs of such works.
Page 106 of 144

Page 107

Ref Recommendation Agreed Management Action Responsible
Officer Due Date Update
3.10 Continuity and Security of IT Operations
The Council should ensure that there is
appropriate oversight of its continuity and
security of IT operations and ensure the
necessary assurances are obtained for
externally hosted systems. 
Services will continue to own and
manage their Business Continuity
arrangements – with support and
guidance from the Resilience Planning
Team. Business Continuity testing
framework has been implemented. It is
recommended that Services test their
plans annually and a corporate test will
be arranged every 3 years.   
Oversight of IT security and IT Disaster
Recovery will continue to be managed
through established corporate working
groups and Service Management
Teams. Development of assurances on
externally hosted systems will be
monitored through the established
arrangements of the Digital North
Lanarkshire Programme of Work.  
Depute Chief
Executive 
Chief Officer
(Business &
Digital)
November
2026 
April 2025
Not yet due. Position as at March 2025:
Depute Chief Executive – Fully implemented
Services will continue to own and manage their individual
Business Continuity arrangements – with support and
guidance from the Resilience Planning Team. Plans are
scheduled to be reviewed annually, or when a significant
change to the service occurs.
Business Continuity testing framework has been
implemented and testing must be undertaken annually.
Since 2024, Business Continuity and Disaster Recovery
arrangements have been separated to show separate
planning and recovery arrangements; however, themes
will show for services in the planning arrangements for
both. To support this, a new joint Champion Group for
DR/BC Champions is being created.
The Corporate Business Continuity Plan has been tested
twice since 2024, the most recent test including a cyber
security incident. Going forward corporate testing will
occur every 3 years with the next test scheduled for
2027/28.
Business and Digital 
Officers with responsibility for IT Disaster Recovery
planning have recently attended all Service Management
Team to raise awareness of improvement activities both
undertaken and planned.
Assurances in respect of externally hosted systems are
progressing through the Performance Optimisation sub-
group of the Digital North Lanarkshire Programme of Work
Board as planned.  To date, the Board have reviewed a
draft supplier assessment framework, confirming such will
shape and compliment changes underway to the
Corporate Procurement Supplier Framework, to ultimately
deliver against this audit recommendation and planned
improvement area. 
Page 107 of 144

Page 108

Ref Recommendation Agreed Management Action Responsible
Officer Due Date Update
3.11 Public Performance Reporting
The Council should improve its public
performance reporting to provide its citizens
and communities with a clear summary of
performance. 
Following various programme of work
reports to each committee cycle
throughout the year, regular news
articles and updates on delivery and
performance are reported through the
council’s website. With the Programme
of Work to 2028 and its associated
governance arrangements well
established, work will be undertaken
during 2025/26 to formally review and
redevelop public performance reporting
arrangements.
Chief Officer
(Business and
Digital) 
Chief Officer
(Strategic
Communication
and
Engagement)
March 2026 Not yet due. Position as at March 2025.
Work will be undertaken during 2025/26 to formally review
and develop public performance reporting arrangements.
2023/24 – Best Value Thematic Report
3.12 Acting on Staff Engagement Feedback
As the council develops its staff engagement
approach, it should ensure that as well as
providing information to staff on council
decisions, it also incorporates the views of
staff and trade unions to support transparent
decision making, and evidence how it is
acting on findings from the Summer 2024
Roadshow sessions.
There are several strands of work
underway which will allow the council to
progress this recommendation,
including a refreshed staff survey and a
review of trade union consultation
arrangements. These will be taken
forward along with the feedback from
our 2024 Roadshow sessions to deliver
an improved engagement approach.
Chief Officer
(People
Resources)
December
2025
Not yet due. Position as at March 2025:
The revised staff survey has been out to consultation with
various stakeholders (services, managers and trade
unions) and has been revised based on feedback
received.  We are now working with Business and Digital
to create the survey on a platform which can be accessed
by all staff groups.  It is expected the survey will be
launched in May and open for responses until June.  If
required, this will be extended.  the information from the
survey will be collated and the results reported to CMT.
3.13 Hybrid Working Policy
The council should continue to monitor the
impact of its hybrid working approach. It
should continually assess the impact of
increasing the number of office days, in terms
of performance, staff wellbeing, and
recruitment and retention.
The council will continue to monitor the
impact of its permanent Hybrid Working
Scheme, through both manager and
staff surveys, and in terms of
performance, recruitment and retention
in hybrid roles.
Chief Officer
(People
Resources)
January
2026
Not yet due. Position as at March 2025:
A revised hybrid working survey will be issued to Hybrid
working. 
Page 108 of 144

Page 109

Ref Recommendation Agreed Management Action Responsible
Officer Due Date Update
3.14 Temporary Workforce
The council should include data reporting on
its temporary workforce as part of published
workforce data, and once available it should
include data on agency workers.
Work is underway to implement a more
centralised approach to reporting on
and managing temporary workforce
resources, including agency workers.
This work will be fully progressed to
improve future reporting.
Chief Officer
(People
Resources)
December
2025
Not yet due. Position as at March 2025:
A small working group will be formed to determine
solutions for storing and reporting on Agency Staff data.
Focus will include determining where is best to store data
without linking to PAYE, testing the agreed system,
determining legacy data, migrating data into iTrent,
designing a formatted report, determining the appropriate
audience, determining who enters and maintains the
agency data and providing training materials, guidance
and business processes to follow. 
Page 109 of 144

Page 110

Page 110 of 144

Page 111

North Lanarkshire Council
Report
Audit and Scrutiny Panel
Does this report require to be approved? ☒ Yes   ☐ No
Ref    FS/ASP/Charter2025 Date 08/05/25
Internal Audit Charter  
From Francis Scott, Chief Officer (Audit and Risk)
E-mail scottfr@northlan.gov.uk Telephone 07787 914207
1. Background
1.1 The Internal Audit Charter is a formal document that defines Internal Audit’s purpose,
mandate, authority and responsibility.  It establishes Internal Audit’s position within the
Council, including detailing the nature of the Chief Officer’s (Audit and Risk) functional
reporting relationship with senior management and the Panel, authorising access to
records, personnel and physical properties relative to the performance of audit
engagements, and defining the scope of Internal Audit activities.
1.2 The most recent version of the Internal Audit Charter was approved by the Panel in
August 2024.  This report outlines the outcome of the most recent review and update
of the Charter following a change in internal audit standards.
Executive Summary
The purpose of this report is to seek approval for the Internal Audit Charter, which sets out
the purpose, mandate, authority and principal responsibilities of the Council’s Internal Audit
function.
To ensure conformance with the recently introduced Global Internal Audit Standards
(GIAS), the content of the Internal Audit Charter approved by the Panel in August 2024 has
been significantly revised and updated, including a new Internal Audit Mandate section
which is a requirement of the GIAS.  The content of the revised Internal Audit Charter has
been agreed with the Chief Executive and the Chief Officer (Finance and Technology) (as
the Council’s Section 95 officer).    
In line with the GIAS, the Internal Audit Charter will be revised and updated annually and
submitted to the Panel for consideration and approval.   
Recommendations
The Panel is invited to approve the revised Internal Audit Charter at Appendix 1.
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Item 7
Page 111 of 144

Page 112

2. Report
2.1 From 1 April 2025, Internal Audit teams across the UK are working to new mandatory
professional standards, replacing the previous Public Sector Internal Audit Standards
(PSIAS).  These standards will be a combination of:
• The Global Internal Audit Standards (GIAS).
• The Application Note “Global Internal Audit Standards in the UK Public Sector”.
• For Local Authorities, the Code of Practice on the Governance of Internal Audit. 
Together, these standards are referred to as the GIAS (UK Public Sector). 
2.2 Although the GIAS are now effective, Internal Audit teams are not expected to
demonstrate full compliance immediately but must work in accordance with the new
standards to build up their conformance.  Internal Audit is currently undertaking a gap
analysis comparing the requirements of the previous PSIAS to the new GIAS.  This
exercise will identify actions required to achieve compliance with the GIAS, and
progress will be presented to future meetings of the Panel.    
2.3 The introduction of the new standards is a significant change to the work of Internal
Audit, and as a result, the previous version of the Internal Audit Charter required to be
reviewed and updated.  A further requirement of the GIAS (UK Public Sector) is the
inclusion of a specific Internal Audit Mandate setting out the authority, roles and
responsibilities of Internal Audit.  
2.4 The revised Internal Audit Charter document is included at Appendix 1, and it is a
requirement that it is approved annually by the Panel.  The content of the Internal Audit
Charter has been agreed with the Chief Executive and the Chief Officer (Finance and
Technology), as the Council’s Section 95 officer. 
3. Measures of success
3.1  The Council is required to ensure that it has an effective internal audit function which
conforms with the GIAS.  Conformance is self-assessed on an annual basis, with an
independent external quality assessment being undertaken at least every five years.   
4. Supporting documentation
4.1 Appendix 1 – Internal Audit Charter 
Francis Scott
Chief Officer (Audit and Risk) 
Page 112 of 144

Page 113

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact because of the Public Sector Equality
Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data?  
Yes ☐ No ☒
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
5.8 Communications impact
Does the report contain any information that has an impact on the council’s communications
activities?
Yes ☐ No ☒
5.9 Risk impact
Is there a risk impact?
Yes ☐ No ☒
If yes, please provide a summary of the key risks and potential impacts, highlighting where
the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk Registers),
and how they are managed?
.
5.10 Armed Forces Covenant Duty
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does it
relate to healthcare, housing, or education services for in-Service or ex-Service personnel, or
their families, or widow(er)s)?
Yes    ☐                No ☒
5.11      Children’s rights and wellbeing impact
Does the report contain any information regarding any council activity, service delivery, policy,
or plan that has an impact on children and young people up to the age of 18, or on a specific
group of these?
Yes ☐         No ☒ 
Page 113 of 144

Page 114

INTERNAL AUDIT
CHARTER  
Page 114 of 144

Page 115

Document control
Title Internal Audit Charter
Owner Francis Scott, Chief Officer (Audit and Risk) Contact scottfr@northlan.gov.uk
Governance Group Audit and Scrutiny Panel
Author Francis Scott, Chief Officer (Audit and Risk) Contact scottfr@northlan.gov.uk 
Revision History
Number Originator Date Review Commenced Revision description/record of change
1.0 Ken Adamson August 2021 Review and update to confirm consistent with
PSIAS which had been updated
2.0 Paula Hendry July 2024 Update and refresh of document
3.0 Francis Scott March 2025 Updated to reflect the requirements of the
Global Internal Audit Standards (UK Public
Sector) 
Document Approvals
Number Governance
Group
Date approval granted Date approval to be requested 
(if document still draft)
1.0 Audit and
Scrutiny Panel
February 2018 
2.0 Audit and
Scrutiny Panel
September 2021 
3.0 Audit and
Scrutiny Panel
August 2024 
4.0 Audit and
Scrutiny Panel 
May 2025 
Consultation Record (for most recent update)
Status of document consulted upon N/A
Stakeholders consulted/date N/A 
Strategic Alignment
The Internal Audit Charter is a formal document that defines Internal Audit’s purpose, mandate, authority and
responsibility and establishes Internal Audit’s position within the Council. 
Next review date
Review Date March 2026, then annually thereafter
Page 115 of 144

Page 116

CONTENTS
1 Introduction 4
2 Purpose of Internal Audit 4
3 Internal Audit Mandate 5
4 Definitions 5
5 Independence, Positioning and Reporting Relationships 6
6 Internal Audit Authority and Oversight 7
7 Internal Audit Objectives and Responsibilities 8
8 Management Responsibilities 12
9 Scope and Types of Internal Audit Services 12
10 Internal Audit Plan 13
11 Resourcing 14
12 Prevention and Detection of Fraud and Corruption 15
13 Follow-up of Audit Recommendations 15
14 Quality Assurance and Improvement Programme 16
15 Annual Reporting and Overall Opinion 16
16 Communication and Reporting 17
17 Approval and Changes to the Internal Audit Mandate and Charter 18
18 Approvals 18 
Page 116 of 144

Page 117

1. INTRODUCTION
1.1 The Local Authority Accounts (Scotland) Regulations 2014 require the Council to
operate a professional and objective internal auditing service in accordance with
recognised standards and practices.  
1.2 The Global Internal Audit Standard (GIAS) came into effect in January 2025 and
together with the Application Note: GIAS in the UK Public Sector, provides the
framework for the practice of internal auditing in the UK Public Sector.  For UK Local
Authorities, the CIPFA Code of Practice on the Governance of Internal Audit in
Local Government also provides guidance on the interpretation of the essential
conditions of the GIAS.
1.3 The GIAS require the Chief Audit Executive (CAE) to implement and maintain an
Internal Audit Charter, which sets out the Purpose of Internal Audit, the Internal Audit
Mandate, and the position and scope of Internal Audit in the Council.  The Internal
Audit Charter is reviewed and approved annually by the Corporate Management
Team and the Audit and Scrutiny Panel. 
2. PURPOSE OF INTERNAL AUDIT
2.1 In line with the GIAS, the purpose of Internal Audit is to strengthen the Council’s ability
to create, protect and sustain value by providing the Council and management with
independent, risk-based and objective assurance, advice, insight and foresight.
2.2 Internal Audit enhances the Council’s successful achievement of its objectives, its
decision making and oversight, and the governance, risk management and control
processes.  In doing so, Internal Audit contributes to the Council’s reputation and
credibility with its stakeholder and its ability to serve the public interest.
2.3 The Council’s Internal Audit function is most effective when:
• It is performed by competent professionals in conformance with the GIAS (UK
Public Sector).
• It is independently positioned with direct accountability to the Audit and Scrutiny
Panel.
• Internal Auditors are free from undue influence and committed to making
objective assessments.
2.4 Internal Audit assurance is provided by delivering an annual programme of audit work
that independently and objectively assesses the design and effectiveness of the
controls established to manage the Council’s most significant risks.  The scope of
Internal Audit covers all Council activities.
2.5 The CAE will report annually to the Audit and Scrutiny Panel and the Corporate
Management Team on the function’s conformance with the GIAS (UK Public Sector),
which will be assessed through a Quality Assurance and Improvement Programme
(QAIP).
2.6 In addition to their primary role, the CAE will also support the Council’s Chief
Executive, the Section 95 Officer and the statutory Monitoring Officer in undertaking
Page 117 of 144

Page 118

their duties.  The CAE will also advise on the control implications of system or process
changes, assist management in their duties to prevent and detect fraud and
corruption, and aim to add value to the Council in all its undertakings. 
3. INTERNAL AUDIT MANDATE
3.1 The authority for Internal Audit is derived from the Local Authority Accounts (Scotland)
Regulations 2014.  This mandate sets out the authority, roles and responsibilities, and
empowers Internal Audit to provide the Audit and Scrutiny Panel and senior
management with independent, risk-based, and objective assurance, advice, insight
and foresight.  
3.2 Internal Audit’s authority is created by its direct reporting relationship to the Audit
and Scrutiny Panel.  Such authority allows for unrestricted access to the Audit and
Scrutiny Panel, and authorises Internal Audit to:
• Have full and unrestricted access to all functions, data, records, information,
physical property, and personnel pertinent to carrying out Internal Audit
responsibilities.
• Allocate resources, set frequencies, select subjects, determine scopes of work,
apply techniques and issue communications to accomplish Internal Audit’s
objectives.
• Obtain assistance from the necessary personnel of the Council, and services from
within or outside the Council to complete Internal Audit services.
3.3 Internal Auditors are accountable for confidentiality and safeguarding records and
information.  The GIAS set out the duty on Internal Auditors to be faithful custodians
of the information they gather, sharing only in limited, defined and controlled ways,
and describes the need for awareness of responsibilities in protecting information
and demonstrating respect for the confidentiality, privacy and ownership of
information.
3.4 In line with GIAS (UK Public Sector), Internal Auditors must also be aware of
circumstances under which sharing or publication of information will be required. 
They must be aware of their Council’s policies and procedures for routine publication
of certain information and where there are statutory obligations to share or publish
information (for example, Freedom of Information requests). 
4. DEFINITIONS
4.1 The following definitions have been adopted as set out in the GIAS 2024 Glossary:
• Internal Audit – an independent, objective assurance and advisory service
designed to add value and improve an organisation’s operations.  It helps an
organisation establish its objectives by bringing a systematic approach to evaluate
and improve the effectiveness of risk management, control and governance
processes.
• Assurance Services – services through which Internal Auditors perform objective Page 118 of 144

Page 119

assessments to provide assurance.  The nature and scope of assurance services
are determined by Internal Audit.
• Advisory Services – Services through which Internal Auditors provide advice to
an organisation’s stakeholders without providing assurance or taking on
management responsibilities.  The nature and scope of advisory services are
subject to agreement with relevant stakeholders.
• Independence – Freedom from conditions that threaten the ability of the Internal
Audit activity to carry out Internal Audit responsibilities in an unbiased manner.
4.2 In addition, key roles within the Council are fulfilled as follows:
• Chief Audit Executive (CAE) is fulfilled by the Chief Officer (Audit and Risk).
• Chief Financial Officer (CFO), is the designated statutory Section 95 Officer and
is fulfilled by the Chief Officer (Finance and Technology).
• Senior Management, is fulfilled by the Council’s Chief Executive, the Corporate
Management Team (CMT) (for all-service approval) and the Business
Management Team (BMT) (in relation to oversight, monitoring and
implementation of outcomes of the annual plan).
• The role of the Board, is undertaken by the Audit and Scrutiny Panel. 
5. INDEPENDENCE, POSITION AND REPORTING RELATIONSHIPS
5.1 The GIAS state that the CAE should be positioned at a level in the Council that enables
Internal Audit services and responsibilities to be performed without interference from
management, thereby establishing the independence of the Internal Audit function.  
5.2 As CAE, the Chief Officer (Audit and Risk) reports functionally to the Audit and Scrutiny
Panel, administratively to the Chief Executive and is a member of the Corporate
Management Team.  This positioning provides the organisational authority and status
to bring matters directly to senior management and escalate matters to the Audit and
Scrutiny Panel, when necessary, without interference, and supports the Internal
Auditors’ ability to maintain objectivity.  
5.3 The CAE is required to confirm to the Audit and Scrutiny Panel, at least annually, the
organisational independence of Internal Audit.  If the governance structure does not
support organisational independence, the CAE must document the characteristics of
the governance structure limiting independence and any safeguards employed to
achieve the principle of independence.  The CAE must disclose to the Audit and
Scrutiny Panel any interference Internal Auditors encounter related to the scope,
performance or communication of Internal Audit work and results.  The disclosure will
include communicating the implications of such interference on Internal Audit’s
effectiveness and ability to fulfil its mandate.
5.4 To ensure that Internal Audit independence and objectivity is maintained for
assurance services, Internal Audit will remain free from interference from anyone
within the Council in relation to audit selection, scope, procedures, frequency, timing
and report content.
Page 119 of 144

Page 120

5.5 Where Internal Audit also has responsibility for non-audit activities, the GIAS require
that appropriate arrangements are established to avoid conflicts of interest.  The CAE
has operational responsibility for the Council’s Risk Management team, and suitable
mitigations are in place to ensure the independence and robustness of future audits
of risk management. This involves the Audit Manager (who has no responsibility for
risk management) managing the whole audit process without input from the CAE, with
the CAE solely being the audit client. 
5.6 Additionally, Internal Audit will not be permitted to audit any activities for which they
have previously been responsible within a period of one year and will not engage in
any other activity that may impair judgement or independence.
5.7 For advisory (including critical friend services), the Internal Audit role will be
specifically restricted to providing guidance, views and opinions.  To comply with
independence requirements, Internal Audit will not be involved in any aspects of
operational decisions subsequently taken by management. 
6. INTERNAL AUDIT AUTHORITY AND OVERSIGHT
6.1 To establish, maintain and ensure that the Council’s Internal Audit function has
sufficient authority to fulfil its duties, the Audit and Scrutiny Panel will approve:
• The Internal Audit Charter, which includes the Internal Audit Mandate and scope
and types of Internal Audit Services.
• The risk-based annual Internal Audit plan.
6.2 The Internal Audit Charter will be updated on an annual basis to consider changes
affecting the Council, such as changes in the type, severity and interdependencies of
risk.  Following this, the Internal Audit Charter will be submitted to the Audit and
Scrutiny Panel for review and approval.
6.3 Additionally, the Audit and Scrutiny Panel will:
• Consider with the CAE and senior management, the appropriate authority, role,
responsibilities, scope and services (assurance and/or advisory) of the Internal
Audit function.
• Ensure the CAE has unrestricted access to, and communicates and interacts
directly with, the Audit and Scrutiny Panel, including in private meetings without
senior management present.
• Consider, with the CAE and senior management, any other topics that should be
included in the Internal Audit Charter.
• Participate in discussions with the CAE and senior management about the
‘essential conditions’ described in the GIAS which establish the foundation that
enables an effective Internal Audit function.
• Review the Internal Audit function’s budget and other resources.
• Provide input to senior management on the appointment and removal of the CAE,
ensuring adequate competencies and qualifications, and conformance with the
GIAS (UK Public Sector).
Page 120 of 144

Page 121

• Review and provide input to senior management on the CAE’s performance.
• Receive communications from the CAE about the Internal Audit function,
including its performance relative to its plan.
• Ensure that a Quality Assurance and Improvement Programme (QAIP) has been
established and review the results annually.
• Make appropriate inquiries of senior management and the CAE to determine
whether scope or resource limitations are appropriate.
6.4 The Audit and Scrutiny Panel, CAE and senior management will ensure that Internal
Audit at all times:
• Has unrestricted access to all Council records, cash, property, assets and people,
where necessary on demand and without prior notice.
• Can obtain explanations as is required to satisfy the probity of any matter under
consideration.
• Can require the production of any records and other such property as is deemed
necessary.
6.5   All senior officers must report to the CAE at the earliest opportunity all actual or
perceived losses (cash, stock, equipment or data), all suspected or actual instances of
theft, embezzlement, fraud, corruption or any other impropriety. 
Page 121 of 144

Page 122

7. INTERNAL AUDIT OBJECTIVES AND RESPONSIBILITIES
7.1 Ethics and Professionalism
The CAE will ensure that Internal Auditors:
• Conform with the GIAS (UK Public Sector) including the principles of Ethics and
Professionalism – integrity, objectivity, competency, due professional care,
confidentiality and the Seven Principles of Public Life.
• Understand, respect, meet and contribute to the legitimate and ethical
expectations of the Council, and can recognise conduct that is contrary to those
expectations.
• Encourage and promote an ethics-based culture in the Council.
• Report organisational behaviour that is inconsistent with the Council’s ethical
expectations, as described in applicable policies and procedures.
7.2 Objectivity
The CAE will ensure that the Internal Audit function remains free from all conditions
that threaten the ability of Internal Auditors to carry out their responsibilities in an
unbiased manner, including matters of engagement, selection, scope, procedures,
frequency, timing and communication.  If the CAE determines that objectivity may be
impaired in fact or appearance, the details of the impairment will be disclosed to
appropriate parties.
Internal Auditors will maintain an unbiased mental attitude that allows them to
perform engagements objectively such that they believe in their work product, do not
compromise quality and do not subordinate their judgement on audit matters to
others, either in fact or appearance.
Internal Auditors have no direct operational responsibility or authority over any of the
activities they review.  Accordingly, Internal Auditors will not implement internal
controls, develop procedures, install systems or engage in other activities that may
impair their judgement, including:
• Assessing specific operations for which they had responsibility in the previous
year.
• Performing operational duties for the Council or its affiliates.
• Initiating or approving transactions external to the Internal Audit function.
• Directing the activities of any employee that is not employed by the Internal Audit
function, except to the extent that such employees have been appropriately
assigned to Internal Audit teams or to assist Internal Auditors.
Internal Auditors will:
• Disclose impairments of independence or objectivity, in fact or appearance, to the
CAE as soon as possible.
• Exhibit professional objectivity in gathering, evaluating and communicating
information.
• Make balanced assessments of all available and relevant facts and circumstances.
Page 122 of 144

Page 123

• Take necessary precautions to avoid conflicts of interest, bias and undue
influence.
The CAE will disclose impairments of independence or objectivity to the Audit and
Scrutiny Panel at least annually.
7.3 Managing the Internal Audit Function
The CAE has the responsibility to:
• At least annually, develop a risk-based Internal Audit plan that considers the input
of the Audit and Scrutiny Panel and senior management.
• Discuss the plan with the Audit and Scrutiny Panel and senior management and
submit the plan to the Audit and Scrutiny Panel for review and approval.
• Communicate the impact of resource limitations on the Internal Audit plan to the
Audit and Scrutiny Panel and senior management.
• Review and adjust the Internal Audit plan as necessary in response to changes in
the Council’s business, risks, operations, programmes, systems and controls.
• Communicate with the Audit and Scrutiny Panel and senior management if there
are significant interim changes to the plan.
• Ensure Internal Audit engagements are performed, documented and
communicated in accordance with the GIAS.
• Follow up on audit findings to confirm the implementation of significant
recommendations or action plans and communicate the results of Internal Audit
services to the Audit and Scutiny Panel and senior management.
• Ensure that the Internal Audit function collectively possesses or obtains the
knowledge, skills and other competencies and qualifications needed to meet the
requirements of the GIAS and fulfil the Internal Audit mandate.
• Identify and consider trends and emerging issues that could impact the Council
and communicate these to the Audit and Scrutiny Panel and senior management
as appropriate.
• Consider emerging trends and successful practices in internal auditing.
• Establish and ensure adherence to methodologies designed to guide the Internal
Audit function.
• Ensure adherence to the Council’s relevant policies and procedures unless such
policies and procedures conflict with the Internal Audit Charter or GIAS.  Any such
conflicts will be resolved or documented and communicated to the Audit and
Scrutiny Panel and senior management.
• Coordinate activities and consider relying upon the work of other internal and
external providers of assurance and advisory services.  If the CAE cannot achieve
an appropriate level of coordination, the issue must be communicated to senior
management and if necessary, escalated to the Audit and Scrutiny Panel.
7.4 Communication with the Audit and Scrutiny Panel and Senior Management
The CAE will report to the Audit and Scrutiny Panel and senior management on:
Page 123 of 144

Page 124

• The Internal Audit function’s mandate.
• The Internal Audit plan and performance.
• Internal Audit resources.
• Significant revisions to the Internal Audit plan and resources.
• Potential impairments to independence, including relevant disclosures as
applicable.
• Results from the QAIP, which include the Internal Audit function’s conformance
with the GIAS (UK Public Sector) and action plans to address the Internal Audit
function’s deficiencies and opportunities for improvement.
• Significant risk exposures and control issues, including fraud risks, governance
issues and other areas of focus for the Audit and Scrutiny Panel that could
interfere with the achievement of the Council’s strategic objectives.
• Outcomes of assurance and advisory services.
• Management’s responses to risk that the Internal Audit function determines may
be unacceptable, or acceptance of a risk that is beyond the Council’s risk appetite. 
Page 124 of 144

Page 125

8. MANAGEMENT RESPONSIBILITIES
8.1 Management will cooperate with Internal Audit on audits and provide access to
records, systems and personnel as required within a reasonable timeframe following
the request. 
8.2 Assurance engagements will be subject to a written terms of reference and report. 
Advisory and agile engagements will be agreed in writing (for example, via email or
written terms of reference) and a relevant output agreed (for example, full report,
summary findings, focussed feedback or an action plan). 
8.3 Draft reports will be shared with management for agreement as to the factual
accuracy of draft findings raised and understanding of Internal Audit
recommendations designed to address the control weaknesses identified.  The
opportunity to have a clearance meeting to discuss the findings will be offered to
management when issuing the draft report.
8.4 It is management’s responsibility to agree to either:
• Accept and fully implement all Internal Audit recommendations.
• Address the risks identified by adopting an alternative approach to that
recommended by Internal Audit.
• Accept the risk associated with not implementing Internal Audit
recommendations with supporting rationale.
8.5 When a draft report is delivered, management are required to agree to the
recommendations in the action plan, including specifying officer responsibility and
anticipated dates for implementation of the recommendations.  Internal Audit will
consider the timeliness of implementation dates according to the associated risk level
identified.
8.6 Management is responsible for ensuring that the agreed management actions are
implemented in full and effectively sustained.
8.7 The GIAS require the CAE to report to both senior management and the Audit and
Scrutiny Panel, details of management’s response to risk that (based on the CAE’s
judgement) may be unacceptable to the Council.  Consequently, any Internal Audit
findings where management has accepted the risk will be highlighted in the Internal
Audit reports. 
9. SCOPE AND TYPES OF INTERNAL AUDIT SERVICES
9.1 The scope of Internal Audit services covers the entire breadth of the Council’s services,
and includes all functions, activities, assets, data, projects and personnel. 
9.2 The scope of Internal Audit activities also encompasses, but is not limited to, objective
examinations of evidence to provide independent assurance and advisory services to
the Audit and Scrutiny Panel and management on the adequacy and effectiveness of
governance, risk management and control processes for the Council.  
9.3 The nature and scope of any advisory services will be agreed with the party requesting
Page 125 of 144

Page 126

the service, provided that the Internal Audit function does not assume management
responsibility.  Opportunities for improving the efficiency of governance, risk
management and control processes may be identified during advisory engagements. 
These opportunities will be communicated to the appropriate level of management.
9.4 Internal Audit engagements may include evaluating whether:
• Risks relating to the achievement of the Council’s strategic objectives are
appropriately identified and managed.
• The actions of Council officers, Chief Officers, management, employees and
contractors (or other relevant parties) comply with the Council’s policies and
procedures, and applicable laws, regulations and governance standards.
• The results of operations, projects and programmes are consistent with
established goals and objectives.
• Operations, projects and programmes are being carried out effectively, efficiently,
ethically and equitably.
• Established processes and systems enable compliance with the policies,
procedures, laws and regulations that could significantly impact the Council.
• Fraud risks are being managed effectively.
• The integrity of information and the means used to identify, measure, analyse,
classify and report such information is reliable.
• Resources and assets are acquired economically, used efficiently and sustainably,
and protected adequately. 
10. INTERNAL AUDIT PLAN
10.1 The CAE will submit an annual Internal Audit Plan to the Audit and Scrutiny Panel for
review and approval, which is designed to support the provision of an evidence based
annual opinion.  The Plan will be developed using a risk-based methodology.  The CAE
will seek input from a range of key stakeholders including Elected Members, the Chief
Executive, senior management and the Corporate Risk Management function.
10.2 The nature of evolving risks makes it likely that the audit assignments included in the
Internal Audit Plan may be subject to change.  Consequently, the Internal Audit Plan
will be subject to regular review by the CAE and any proposed changes to the
approved plan (due to emerging risks, suspected fraudulent activity, or other issues
or factors that result in changes to the planned Internal Audit activities) will be
approved by both senior management and the Audit and Scrutiny Panel.
10.3 The GIAS (UK Public Sector) requires the CAE to coordinate with internal and external
assurance providers to consider relying on their work and minimise duplication of
effort.
10.4 The GIAS (UK Public Sector) recognises that there are various relevant outside
assurance providers whose authority flows from separate legal or regulatory sources
beyond the control or influence by the CAE, and they may not have any ability to
access the work of those assurance providers or gain insight into the scope and timing
Page 126 of 144

Page 127

of their work.  Under these circumstances, the CAE must consider whether it is
possible or practical to coordinate.     
10.5 Where adopted, a consistent process for the basis of reliance should be established
as, where reliance is placed on the work of others, the CAE remains accountable and
responsible for ensuring that there is adequate support for conclusion and opinions
reached where reliance has been placed on work performed by other assurance
providers.
10.6 Therefore, when dealing with an external party, Internal Audit will clearly define the
respective roles, responsibilities and other expectations (including restrictions on
distribution of results of the engagement and access to engagement records).
10.7 Internal Audit also reserves the right to raise findings on areas that have not been
specifically included in the Internal Audit Plan where significant or systematic control
gaps are evident. 
11. RESOURCING
11.1 The GIAS (UK Public Sector) requires the CAE to effectively deploy and manage
financial, human and technological resources to implement the Internal Audit
Strategy and achieve the Internal Audit Plan and Mandate.   The Application Note:
GIAS in the UK Public Sector notes that funding processes for Internal Audit
functions in the public sector vary and may prevent the CAE from being able to seek
or obtain additional funding due to other funding priorities within the Council.  This
may impact the way in which the CAE uses resources.  In line with the GIAS (UK Public
Sector) the basis for conformance is:
• Where there are constraints on resources, the CAE must develop a resource
strategy which suggests practical approaches for consideration by the Audit and
Scrutiny Panel.
• The CAE must inform the Audit and Scrutiny Panel of the impact of insufficient
resources and any options available to mitigate that impact.
• Where there are no constraints, the CAE must set out what alternative
approaches apply to the Internal Audit service and then seek to manage financial,
human and IT resources within those constraints.
11.2 The CAE must inform the Audit and Scrutiny Panel of any resource management
arrangements at the Council that may put at risk the ability of the Internal Audit
function to fulfil its mandate.
11.3 The Council’s Internal Audit Plan will include the budgeted resource requirements
needed to deliver the proposed audit engagements.  It will also include a contingency
to address unplanned work.  Should circumstances arise during the year that suggest
that available resource levels appear to be falling below the level required to deliver
the Internal Audit Plan, the CAE will communicate the impact of resource limitations
to senior management and the Audit and Scrutiny Panel. 
Page 127 of 144

Page 128

12. PREVENTION AND DETECTION OF FRAUD AND CORRUPTION
12.1 Council management is responsible for the prevention and detection of fraud or
corruption.  Internal Audit will assist management in the discharge of this
responsibility.  Audit procedures alone, even when performed with due professional
care, cannot guarantee that fraud or corruption will be detected.  Internal Audit will
however exercise an appropriate level of professional scepticism during audit work
and be alert to risks and exposure that could allow the opportunity for fraud or
corruption to occur.
12.2 Managers, staff and elected members must always be alert to the risk of fraud, theft,
bribery and corruption.  Discovery of any suspected or actual fraud or irregularity that
affects the Council should be reported immediately to the CAE and information on
suspected or actual fraud may inform the annual audit opinion and the risk-based
Internal Audit Plan.  The CAE may then direct Internal Audit resources to investigate,
or assist management investigations, into suspected or actual cases.
12.3 The Council has a zero-tolerance attitude and will not accept any level of fraud, bribery
or corruption.  The Council’s Counter Fraud Policy sets out clear procedures for the
reporting and investigation of actual or suspected fraud. 
13. FOLLOW-UP OF AUDIT RECOMMENDATIONS
13.1 Management is responsible for implementing audit recommendations with agreed
timescales.  Management should inform Internal Audit of the progress of
implementation and providing appropriate evidence to support closure of each
recommendation.  Internal Audit will review the evidence provided, and where
necessary may undertake proportionate reperformance testing to confirm that the
recommendations have been effectively implemented and sustained.
13.2 Internal Audit will report on the progress made by management in the
implementation of recommendations to each regular meeting of the Audit and
Scrutiny Panel.
13.3 Following initial agreement to implement a recommendation, management may
subsequently inform Internal Audit that the action cannot be implemented as agreed
and decide to accept the risk associated with the original audit finding. Management
should inform Internal Audit of the justification for this decision and detail any
mitigating actions and residual risks and monitor the ongoing risk through the
appropriate risk management process (for example, corporate or service risk
registers).  Internal Audit will note the recommendation as ‘Closed – Management
Accepts Risk’, and all risk acceptances will be reported to the Audit and Scrutiny Panel. 
Page 128 of 144

Page 129

14. QUALITY ASSURANCE AND IMPROVEMENT PROGRAMME (QAIP)
14.1 The CAE is responsible for ensuring the quality of audit work and that the Internal
Audit function is continuously seeking improvement.  The GIAS (UK Public Sector)
defines quality as a combined measure of conformance with the GIAS and
achievement of the Internal Audit function’s performance objectives.
14.2 The CAE will develop, implement and maintain a Quality Assurance and Performance
Programme (QAIP) that covers all aspects of the Internal Audit function.  The QAIP will
include external and internal assessments of Internal Audit’s conformance with the
GIAS (UK Public Sector), as well as performance measurement to assess Internal
Audit’s progress towards achievement of its objectives and promotion of continuous
improvement.  If applicable, the assessment must include plans to address the
function’s deficiencies and opportunities for improvement.
14.3 The CAE will report annually to the Audit and Scrutiny Panel and senior management
on progress with the QAIP, including the results of internal assessments (ongoing
monitoring and periodic self-assessments) and external assessments.
14.4 External assessments will be conducted at least once every five years by a qualified,
independent assessor or assessment team from outside the Council, whose
qualifications must meet the requirements set out in the GIAS (UK Public Sector).  The
Council’s next external assessment is due to take place in late 2028.
14.5 Compliance with the CIPFA Code of Practice on the Governance of Internal Audit
in Local Government must also be reflected in internal and external quality
assessments. 
15. ANNUAL REPORTING AND OVERALL OPINION
15.1 In line with the GIAS (UK Public Sector) the CAE must, at least annually:
• Conclude on the overall adequacy and effectiveness of the Council’s framework
of governance, risk management and control (the Annual Internal Audit Opinion).
• Include a statement on conformance with the GIAS (UK Public Sector) and the
results of the QAIP.
15.2 The Internal Audit Annual Report and Opinion for the Council is based on the
outcomes of the audits included in the Internal Audit Plan, progress in addressing any
prior year significant issues, progress with the implementation of agreed audit actions
by management, the result of any other Internal Audit activities that have identified
control gaps exposing the Council to risk, and the professional judgement of the CAE. 
Page 129 of 144

Page 130

16. COMMUNICATION AND REPORTING
16.1 The CAE will report regularly to the Audit and Scrutiny Panel on the progress with, and
the results of the work of Internal Audit, enabling review and scrutiny of the following
areas as required by GIAS.
REPORT FREQUENCY
Internal Audit Charter Annually
Internal Audit Strategy Annually
Annual Internal Audit Plan Annually
Internal Audit Progress Reports 
(including planned audits, other Internal Audit
activity and recommendation follow-up reports) 
Each meeting of
Audit and Scrutiny
Panel
Proposed material changes to the Annual Internal
Audit Plan
At least six-monthly
Internal Audit Annual Report and Opinion, including:
• Effectiveness of the governance, risk
management and control framework.
• Internal Audit independence.
• Conformance with the GIAS (UK Public Sector)
including ethics and professionalism
requirements.
Annually
Internal Quality Assessments
(including results of assessments, progress of
collective action points and compliance with the
CIPFA Code of Practice for the Governance of
Internal Audit in the UK)
Annually
External Quality Assessments At least every five
years
16.2 Progress against the work in the Internal Audit Plan, and the outputs of this work will
also be reported to appropriate meetings of the BMT and CMT. 
Page 130 of 144

Page 131

17. APPROVAL AND CHANGES TO THE INTERNAL AUDIT MANDATE AND CHARTER
17.1  The Internal Audit Charter is subject to approval by the Chief Executive, Section 95
Officer and Audit and Scrutiny Panel on an annual basis.  Approval is evidenced
through the CMT and Audit and Scrutiny Panel meeting papers and minutes, and the
approval in Section 18 below.
17.2 Circumstances may justify a discussion between the CAE, the Audit and Scrutiny Panel
and senior management on the Internal Audit Mandate or other aspects of the
Internal Audit Charter.  Such circumstances may include but are not limited to:
• A significant change in the GIAS.
• A significant reorganisation within the Council.
• Significant changes in the CAE, the Audit and Scrutiny Panel and/or senior
management.
• Significant changes to the Council’s strategies, objectives, risk profile or the
environment in which the Council operates.
• New laws or regulations that may affect the nature and/or scope of Internal Audit
services. 
18 APPROVALS
Approved by the Audit and Scrutiny Panel  Date: 
Approved by the Chief Executive Date: 
2 April 2025
Approved by the Chief Officer (Finance & Technology)
(Section 95 Officer)
Date: 
2 April 2025
Approved by the Chief Officer (Audit and Risk) Date: 
31 March 2025 
Page 131 of 144

Page 132

Page 132 of 144

Page 133

North Lanarkshire Council
Report
Audit and Scrutiny Panel 
Does this report require to be approved? ☐ Yes   ☒ No
Ref   FS/ASP/RMMay25 Date 08/05/25 
Risk Management Update 
From  Francis Scott, Chief Officer (Audit and Risk)  
E-mail ScottFr@northlan.gov.uk Telephone 07887 914207 
Executive Summary
This report seeks to support the Audit and Scrutiny Panel in the discharge of the aspect of
its remit of monitoring the effective development and operation of risk management in the
Council. 
The report provides commentary of Corporate Risk Register (CRR) developments since
the last update in February. The report also includes a high-level overview of Horizon
Scanning activity, the product of which will be used to inform deliberation on entries on
CRR and Service Risk Registers (SRR). The report concludes with a summary of the key
considerations of the Risk Management Corporate Working Group (RMCWG) within the
reporting period.    
Recommendations
The Panel is asked to consider the contents of the report and note: 
(a) the information provided on developments on the CRR for 2024-25 as detailed in
sections 2.1 – 2.4 and Appendix 1.
(b) The Horizon Scanning information detailed in sections 2.5 – 2.7 and Appendix 2.
(c) The summary of the key discussion points of the RMCWG captured from section 2.8. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Item 8
Page 133 of 144

Page 134

1. Background 
1.1 The Audit and Scrutiny Panel terms of reference include the remit to monitor the
effective development and operation of risk management in the Council. This report
supports the Panel in discharging that aspect of its remit by providing an overview of
how certain requirements of the Risk Management Strategy have been delivered during
the reporting period. 
2. Report 
Corporate Risk Register 2024-25 
2.1 Risks on the CRR are subject to ongoing monitoring and review, with higher scoring
risks being subject to more frequent review.  Management considers factors such as
changes in the operating environment, the effectiveness of existing controls, the
development of additional controls and progress of agreed actions to determine
whether it would be appropriate to adjust the risk assessment in line with the Risk
Management Strategy. 
2.2  The CRR is updated to reflect any changes arising from these reviews, and an updated
version is included at Appendix 1.  There have been no additions to the CRR, and no
risks have been deferred to a Service Risk Register since the last update. 
Key developments relating to Corporate Risks since the last update 
2.3 Improving Educational Outcomes 
2.3.1 This entry on the CRR captures the uncertainty in around the effectiveness of the
strategies and approaches in place to address the poverty related attainment gap. The
latest management review of the risk recorded increases in residual likelihood and
impact resulting in an increase in residual risk rating from medium (9) to high (16). 
2.3.2 The increase in likelihood reflects the emerging challenges linked to the reduced levels
of funding from Scottish Government, such as Pupil Equity Fund (PEF) and Strategic
Equity Fund (SEF).  A reduction in funding may mean that some of the identified
controls in place will be difficult to maintain at the current level. Furthermore, the Service
will need to begin to create an exit strategy as no information has been provided from
the Scottish Government about any future funding after the end of Scottish Attainment
Challenge (SAC) funding in session 2025-26. 
2.3.3 There is great uncertainty about the level of funding that will be available after March
2026. Any reduction to current funding levels will undoubtedly have a negative impact.
Although NLCs current funding allocation is confirmed until the end of March 2026,
Scottish Government approval is required for PEF and SEF allocations to be used until
the end of the academic session (August 2026). As a result of this uncertainty, the
Residual Likelihood Assessment has increased from 3 to 4.  This assessment will be
reviewed once Scottish Government provides further information about future funding
allocations. The current uncertainty impacts on our baseline measure and possible
improvement trajectory. 
2.3.4 The residual impact score has also increased from 3 to 4. Analysis of trends show that
while there have been improvements in attainment within the primary sector, at Page 134 of 144

Page 135

secondary level overall attainment and the gap remains challenging with data showing
that attainment dipped across several key measures in the last session. Without
continued funding, it will be difficult to provide targeted support to establishments to
raise attainment, particularly at the senior phase. This issue has been escalated and
discussed at Education and Families Committee.  The Scottish Government will issue
the next trend analysis in September 2025, which will cover school leavers during the
year August 2024 to June 2025. At this point, it will be clearer whether the attainment
dip within session 2024, is a one-year anomaly or early indications of a developing
trend.   
2.4 Enterprise Contract (Mobilisation) 
2.4.1 This entry captures uncertainty pertaining to the ongoing contract management of the
Enterprise Contract so that added value is delivered from the approach. Following
representations form colleagues in Community Operations, the descriptive aspect of
the risk has been amplified to include supplier failure as a potential cause of the risk
materialising. An additional control has been recorded regarding contingency
arrangements to minimise service disruption should that occur. This change did not
result in any changes to risk scoring. 
Horizon Scanning 
2.5 The Corporate Risk Team undertake an annual Horizon Scanning exercise to inform
deliberations on matters for inclusion on the CRR and SRRs. The main source of
information used in this year’s exercise in the World Economic Forum’s “Global Risks
Report 2025”. The report is underpinned by the Global Risks Perception Survey
(GRPS) which captures views on the risk landscape from a range of stakeholders. Our
analysis narrows in on the responses from government stakeholders with a focus on
the risks perceived as having at the most impact over the short term (2 years) and over
the long term (10 years). 
2.6 Based on the information in the report, Appendix 2 presents the top 10 risks as
perceived by government respondents in the short and long term. These are listed
alongside the aggregate results from all stakeholder groups for comparative purposes.
This information will be shared with colleagues internally and will inform our next review
of the CRR. 
2.7 Informal comparisons with the top-level risk registers of a sample of other Local
Authorities has also been undertaken. Information on this comparison will be part of the
suite of information made available to inform risk and risk register reviews. 
Other Risk Management Developments 
2.8 The RMCWG co-ordinates activities and resources in order to implement the Risk
Management Strategy and promote good risk management practice throughout the
Council. There was one session of the RMCWG since the last report to Panel, with the
key discussion points noted below: 
Horizon Scanning 
2G Network Switch Off
• Potential risk of service disruption as a result of the switch off of the 2G network.
Consideration given to how to make services aware so that supplier engagement
can take place. 
Training
• External Training for Risk Champions delivered in February. Page 135 of 144

Page 136

• Positive mandatory internal training completion rates reported. 
3. Measures of success 
3.1  The Corporate Risk Team will continue to report quarterly to CMT and the Audit and
Scrutiny Panel, providing an overview of key developments in risk management and
updating on progress in respect of planned improvements to the Council’s risk
management arrangements. 
3.2 The adequacy and effectiveness of the Council’s risk management arrangements will
be subject to independent review by Internal Audit, who will report directly on the results
of that work to the Audit and Scrutiny Panel. 
3.3 Effective risk management arrangements assist the Council in achieving planned
outcomes and/or help the Council mitigate the impacts of adverse events.   
4. Supporting documentation 
Appendix 1: Corporate Risk Register 2024-25
Appendix 2: Horizon Scanning (WEF Global Risks Survey 2025 Summary) 
Francis Scott, Chief Officer (Audit and Risk) 
Page 136 of 144

Page 137

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact because of the Public Sector Equality
Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data?  
Yes ☐ No ☒
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
5.8 Communications impact
Does the report contain any information that has an impact on the council’s communications
activities?
Yes ☐ No ☒
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If yes, please provide a summary of the key risks and potential impacts, highlighting where
the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk Registers),
and how they are managed?
Effective risk management arrangements will enable the Council to manage its risks more
effectively, increasing the likelihood of the Council achieving its plans and ambitions by
minimising or mitigating potential threats to planned outcomes.  A robust risk management
strategy lays out the framework and underpins all risk management activity across the
organisation.
5.10 Armed Forces Covenant Duty
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does it
relate to healthcare, housing, or education services for in-Service or ex-Service personnel, or
their families, or widow(er)s)?
Yes    ☒                No ☒
5.11      Children’s rights and wellbeing impact
Does the report contain any information regarding any council activity, service delivery, policy,
or plan that has an impact on children and young people up to the age of 18, or on a specific
group of these?
Yes ☐         No ☒ 
Page 137 of 144

Page 138

Appendix 1          Corporate Risk Register 2024-25 
CORPORATE RISKS (Operational) Likelihood Impact Rating Evaluation Change
1. Home support service delivery/
sustainability 5 5 25 Very High No
2. Information security and governance 5 4 20 High No
3. ICT operational capability   5 4 20 High No
4. Enterprise Contract (Mobilisation)  4 5 20 High No
5. Human resources (workforce planning) 4 4 16 High No
6. Public protection 4 4 16 High No
7. Procurement risk 4 4 16 High No
8. Governance, leadership and decision-
making 4 4 16 High No
9. Health and Safety 5 3 15 Medium No
10. RAAC 3 5 15 Medium No
11. Business continuity planning 5 3 15 Medium No
12. Terrorism 3 5 15 Medium No
13. Home to school transport delivery/
sustainability   3 4 12 Medium No
14. Resilience planning 2 5 10 Medium No
15. Serious organised crime, fraud and
corruption  3 3 9 Medium No
CORPORATE RISKS (Strategic) Likelihood Impact Rating Evaluation Change
16. Tackling poverty 5 4 20 High No
17. Power resilience (Black Start) 4 5 20 High No
18. Climate change 5 4 20 High No
19. Digital adoption 5 4 20 High No
20. Improving educational outcomes 4 4 16 High Was 9
21. Financial sustainability 3 5 15 Medium No
22. Digital and IT strategy 4 3 12 Medium No
23. Engagement and consultation 3 3 9 Medium No
24. Delivery of approved programme of
work  2 4 8 Low No
Page 138 of 144

Page 139

Appendix 2 Horizon Scanning Summary (Source: World Economic Forum. Global Risks Report 2025)
Numbers represent stakeholder ranking of likely impact (severity) of risks in the relevant timeframe (1 = most severe) 
Government  All
Risk  Short term (2
Years)
Long term (10
years) 
Short term (2
Years)
Long term (10
years)
Misinformation and disinformation
Persistent false information (deliberate or otherwise) widely
spread through media networks, shifting public opinion in a
significant way towards distrust in facts and authority. Includes,
but is not limited to: false, imposter, manipulated and fabricated
content.
1 5  1 5
Extreme weather events (floods, heatwaves, etc)
Loss of human life, damage to ecosystems, destruction of
property and/or financial loss due to extreme weather events.
Includes, but is not limited to: land-based (e.g. wildfires), water-
based (e.g. floods), and atmospheric and temperature-related
(e.g. heat-waves) events, including those exacerbated by climate
change.
2 1  2 1
Pollution (air, soil, water, etc)
Introduction of harmful materials into the air, water and soil
stemming from human activity, resulting in impacts to and loss of
human life, financial loss and/or damage to ecosystems. Includes,
but is not limited to: household and industrial activities;
environmental accidents, such as oil spills; and radioactive
contamination.
3 9  6 10
Page 139 of 144

Page 140

Government  All
Risk  Short term (2
Years)
Long term (10
years) 
Short term (2
Years)
Long term (10
years)
State-based armed conflict (proxy, civil wars, coups,
terrorism, etc)
Bilateral or multilateral use of force between states and/or
between a state and non-state actor(s), often with ideological,
political or religious goals, manifesting as war and/or organized,
sustained violence. Includes, but is not limited to: hot wars, proxy
wars, civil wars, guerilla warfare, terrorism, genocide and
assassinations.
4   3 
Societal polarization
Present or perceived ideological and cultural divisions within and
across communities leading to declining social stability, gridlocks
in decision-making, economic disruption and increased political
polarization.
5   4 8
Cyber espionage & warfare
Use of cyber weapons and tools by state and non-state actors to
gain control over a digital presence, cause operational disruption,
and/or compromise or damage an entity’s technological and
information networks and infrastructure. Includes: defensive and
offensive cyber operations that occur during or trigger armed
conflict, and cyberattacks that steal classified, sensitive data or
intellectual property to gain an advantage. 
6 7  5 9 
7    
Page 140 of 144

Page 141

Government  All
Risk  Short term (2
Years)
Long term (10
years) 
Short term (2
Years)
Long term (10
years)
Debt (public, corporate, household)
Corporate, household, or public finances struggle to service debt
accumulation, resulting in mass bankruptcies or insolvencies,
liquidity crises or defaults and sovereign debt crises.
Crime and illicit economic activity (incl. cyber)
Global proliferation of organized crime or the illicit activities of
businesses and individuals that undermine economic
advancement and growth, facilitated on both a borderless and
digital basis. Includes, but is not limited to:
illicit financial flows (e.g. tax evasion, sanctions evasion and
money laundering), illicit trade and trafficking (e.g. counterfeiting,
human trafficking, wildlife trade and weapons), and cybercrime
(including ransomware, data theft and online fraud)
8    
Geoeconomic confrontation (sanctions, tariffs, investment
screening)
Deployment of economic levers by global or regional powers to
reshape economic interactions between nations, restricting goods,
knowledge, services or technology with the intent of building self-
sufficiency, constraining geopolitical rivals and/or consolidating
spheres of influence. Includes, but is not limited to: 
currency measures, investment controls, sanctions, state aid and
subsidies, and trade controls.
9   9 
Page 141 of 144

Page 142

Government  All
Risk  Short term (2
Years)
Long term (10
years) 
Short term (2
Years)
Long term (10
years)
Inequality (wealth, income)
Present or perceived substantive disparities in the distribution of
assets, wealth or income within or between countries, resulting in
material differences in related economic outcomes. Includes, but
is not limited to: 
growing or persistent poverty and economic polarization.
10 4  7 7       
Critical change to Earth systems
Long-term, potentially irreversible and self-perpetuating changes
to critical planetary systems, as a result of breaching a critical
climatic or ecological threshold or ‘tipping point’, at a regional or
global level. Includes, but is not limited to: 
sea level rise from collapsing ice sheets, carbon release from
thawing permafrost, and disruption of ocean or atmospheric
currents. 
2   3
Biodiversity loss and ecosystem collapse
Severe consequences for the environment, humankind and
economic activity due to destruction of natural capital stemming
from species extinction or reduction, spanning both terrestrial and
marine ecosystems. 
3   2
Page 142 of 144

Page 143

Government  All
Risk  Short term (2
Years)
Long term (10
years) 
Short term (2
Years)
Long term (10
years)
Natural resource shortages (food, water)
Supply shortages of food or water for human, industry or
ecosystem use, manifesting as food and water insecurity
at a local, regional or global level, stemming from, but not limited
to: human overexploitation and mismanagement
of critical natural resources, climate change (including drought
and desertification), and/or a lack of suitable infrastructure. 
6   4
Adverse outcomes of AI technologies
Intended or unintended negative consequences of advances in AI
and related technological capabilities (including Generative AI) on
individuals, businesses, ecosystems and/or economies. 
8   6
Concentration of strategic resources (and technologies)
Concentration of strategically important resources (minerals,
materials, technologies) among a small number of
individuals, businesses or states that can control access and
dictate discretionary pricing. 
10   
Page 143 of 144

Page 144

Government  All
Risk  Short term (2
Years)
Long term (10
years) 
Short term (2
Years)
Long term (10
years)
Involuntary migration or displacement
Forced movement or displacement across or within borders,
stemming from, but not limited to: 
persistent discrimination and persecution; lack of economic
advancement opportunities; human-made disasters; natural
disasters and extreme weather events, including the impacts of
climate change; and internal or interstate conflict. 
8
Erosion of human rights and/or civic freedoms
Loss of protections for rights inherent to all human beings,
regardless of individual status, and/or the freedoms that underpin
civic space. Includes, but is not limited to the right to: life and