Democracy Spraffa

Agenda Document Pack - Audit and Scrutiny Panel - 24/09/2026

North Lanarkshire Council · 24 September 2026
Back to Audit and Scrutiny Panel — 24 September 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

15 September 2026 
Members of the 
Audit and Scrutiny Panel
Chief Executive’s Office
Rachel Blair
Chief Officer (Legal, Democratic and Strategy)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk 
Notice is given that a Special Meeting of the Audit and Scrutiny Panel is to be held in the
Council Chamber, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on Thursday, 24
September 2026 at 14:00 PM which you are requested to attend. 
The agenda of business is attached. 
Rachel Blair
Chief Officer (Legal, Democratic and Strategy) 
Members : 
Clerk Name: Karen Swan
Clerk Telephone: 07919 730272
Clerk Email: committee@northlan.gov.uk 
S Watson, P Kelly, C Costello, M Hughes, J Hume, D Johnston, J Leckie, M McCulloch, J
McLaren, P Patton, G Robinson.  
Page 1 of 64

Page 2

Page 2 of 64

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical Standards
In Public Life Etc. (Scotland) Act 2000 
2 Audit Scotland 2025-2026 Annual Audit report
Submit report by the Chief Officer (Audit and Risk) presenting
the 2025-26 Annual Audit Report to elected members.
Appendix 1 Copy to follow 
5 - 8 
3 Annual Accounts 2025-26 (Audited)
Submit report to Chief Officer (Finance and Technology)
(Copy to follow) 
4 Annual Accounts 2025-26 - Letters of Representation
Submit report by the Chief Officer (Finance and Technology)
providing the letter of representation submitted to Audit
Scotland. 
9 - 16 
5 Annual Accounts 2025-26 - External Auditors report to
those charged with Governance on the 2025-26 Audit
Submit report by the Chief Officer (Finance and
Technology)  providing the external auditors comments on
matters arising from their audit of the financial statements for
the Council. 
17 - 32 
6 Best Value Thematic Audit: Asset Management
Submit report by Chief Officer (Legal, Democratic and
Strategy) presenting the outcome of the thematic Best Value
audit on asset management. 
33 - 64 
Page 3 of 64

Page 4

Page 4 of 64

Page 5

North Lanarkshire Council
Report
Audit and Scrutiny Panel 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    FS/ASP/ExtAudARR Date 24/09/26 
Audit Scotland 2025-26 Annual Audit Report 
From  Francis Scott, Chief Officer (Audit and Risk)  
E-mail scottfr@northlan.gov.uk   
Executive Summary
The purpose of this report is to present the 2025-26 Annual Audit Report to elected
members.  The report is produced by the Council’s appointed external auditors, Audit
Scotland, in respect of the audit of the Council for the year-ending 31 March 2026. 
A copy of the 2025-26 Annual Audit Report is attached at Appendix 1.  The report
summarises the work undertaken by Audit Scotland and presents the main findings arising
from the audit.  The report also contains audit recommendations and responses, including
planned actions, which have been agreed by management. 
Audit Scotland will present the report to Panel and highlight any issues arising from their
work that they wish to bring to the Panel’s attention.
Recommendations
The Panel is invited to: 
(a) invite the external auditor to speak to the report and to highlight key messages arising
from the audit; and 
(b) through Internal Audit reporting, agree to monitor the implementation of management
actions agreed in response to external audit’s recommendations.
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Item 2
Page 5 of 64

Page 6

1. Background 
1.1 The Accounts Commission have appointed Audit Scotland as the Council’s external
auditor.  Expected outputs to be produced by the Council’s external auditors are
outlined each year in their annual planning document. 
1.2 The external auditor is required to prepare an annual report for elected members and
the Controller of Audit summarising the findings from the annual audit of the Council. 
The annual report for 2025-26 has been discussed and agreed with senior
management. 
2. Report  
2.1  The 2025-26 Annual Audit Report presents the key matters identified from the external
audit of the Council’s annual accounts and the wider scope areas of financial
management, financial sustainability, vision, leadership and governance, best value
arrangements and the use of resources to improve outcomes. 
2.2 The report also details the external auditor’s audit opinion on the 2025-26 financial
statements. 
2.3 Audit recommendations arising from the audit are included in the Action Plan, with
appropriate management responses, agreed timescales and responsible officers. 
Progress implementing agreed actions will be monitored by Internal Audit and reported
to future meetings of the Panel. 
3. Measures of success 
3.1  The Council is committed to delivering effective and efficient financial reporting and
high standards of financial management and corporate governance which underpin the
delivery of Council services and the achievement of planned outcomes and corporate
priorities and ambitions. 
3.2 Both Internal and External Audit report to the Audit and Scrutiny Panel on their
assessment of the adequacy and effectiveness of the Council’s financial management
and corporate governance arrangements.   
4. Supporting documentation 
Appendix 1 North Lanarkshire Council – 2025-26 Annual Audit Report 
Francis Scott 
Chief Officer (Audit and Risk)  
Page 6 of 64

Page 7

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒  
Page 7 of 64

Page 8

If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Effective responses by management to the control issues and/or areas of
improvement identified by External Audit will increase the likelihood of the Council
achieving its ambitions by improving control frameworks and more effectively
mitigating potential risks and threats to the achievement of planned outcomes. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 8 of 64

Page 9

North Lanarkshire Council
Report
Audit and Scrutiny Panel 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    GT/VR/FC Date 24/09/26 
Annual Accounts 2025/26 – Letter of Representation 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail TelferG@northlan.gov.uk   
1. Background 
1.1 The Local Government (Scotland) Act 1973 requires all local authorities to appoint an
officer who has responsibility for the administration of their financial affairs (known as
the Section 95 Officer). 
1.2 International Standards on Auditing (ISA580 Written Representations) require external
audit to request a written representation from the accountable officer providing written
assurance on aspects of the Council’s financial statements and Charitable Trust and
Educational Trust Accounts including the judgements and estimates made in their
preparation. 
2. Report 
2.1 The letter of representation has been signed in my capacity as Section 95 Officer for
the Council. A copy of the letter is attached. 
Executive Summary 
The purpose of this report is to provide Members with information on the Letter of
Representation required to be submitted to Audit Scotland in respect of the Council’s
Annual Accounts for 2025/26. 
Recommendations
It is recommended that the Audit and Scrutiny Panel: 
(1) Note the Letter of Representation provided to Audit Scotland  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 4
Page 9 of 64

Page 10

2.2 As in previous years, the letter set out the representations of management and confirms
that the accounts are free from material misstatement. 
2.3 During the course of the audit, a number of misstatements within the Council’s financial
statements were identified, with those deemed material corrected, these are
summarised in Exhibit 4 of the Annual Audit report.  There are three misstatements
which have not been adjusted for and summary information in respect of these is
provided at Appendix 2 in the Annual Audit Report. The value, nature, and
circumstances of the uncorrected misstatements were considered, individually and in
aggregate, by the audit team, and it was concluded these were not material to the
financial statements. As a result, these did not have any impact on the audit opinions
given in the Independent Auditor’s Report. 
2.4 A list of items that have arisen relating to the Council’s accounts are contained within
the External Audit Annual Audit Report which forms part of this meeting’s agenda. 
3. Measures of success 
3.1  N/A 
4. Supporting documentation 
Appendix 1 North Lanarkshire Council Letter of Representation 
Greg Telfer
Chief Officer (Finance and Technology) 
Page 10 of 64

Page 11

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 11 of 64

Page 12

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 12 of 64

Page 13

Our Ref:
Your Ref:
Contact:
E-mail:
Date:
GT/VR/FC 
Greg Telfer
TelferG@northlan.gov.uk 
John Boyd, Audit Director 
Audit Scotland
4th Floor
8 Nelson Mandela Place
Glasgow
G2 1BT  
Chief Executive’s Office
Greg Telfer
Chief Officer (Finance and Technology)
Civic Centre
Windmillhill Street
Motherwell ML1 1AB
www.northlanarkshire.gov.uk
Dear John,
North Lanarkshire Council
Annual accounts 2025/26 
This representation letter is provided in connection with your audit of the annual accounts of
North Lanarkshire Council and its group, (hereafter referred to as North Lanarkshire Council)
for the year ended 31 March 2026 for the purpose of expressing an opinion as to whether the
financial statements give a true and fair view and have been properly prepared, and for
expressing other opinions on the Remuneration Report, Management Commentary, and
Annual Governance Statement.
I confirm to the best of my knowledge and belief, and having made such enquiries as I
considered necessary, the following representations given to you in connection with your audit
of North Lanarkshire Council’s annual accounts for the year ended 31 March 2026.
General
I have fulfilled my responsibilities for the preparation of the 2025/26 annual accounts as set
out in your 2025/26 Annual Audit Plan. All the accounting records, documentation, and other
matters which I am aware are relevant to the preparation of the annual accounts have been
made available to you for the purposes of your audit. All transactions undertaken by North
Lanarkshire Council been recorded in the accounting records and are properly reflected in the
financial statements. 
I confirm that the effects of uncorrected misstatements are immaterial, individually and in
aggregate, to the financial statements as a whole. I am not aware of any uncorrected
misstatements other than those reported by you.
Financial Reporting Framework
The annual accounts have been prepared in accordance with the Code of Practice on Local
Authority Accounting in the United Kingdom 2025/26 (2025/26 Code) and the requirements of
the Local Government (Scotland) Act 1973, the Local Government in Scotland Act 2003, and
the Local Authority Accounts (Scotland) Regulations 2014. 
Appendix 1
Page 13 of 64

Page 14

In accordance with the Local Authority Accounts (Scotland) Regulations 2014, I have ensured
that the financial statements give a true and fair view of the financial position of North
Lanarkshire Council at 31 March 2026 and the transactions for 2025/26.
Accounting Policies and Estimates
All material accounting policies applied are as shown in the note included in the financial
statements. The accounting policies are determined by the 2025/26 Code, where applicable.
Where the 2025/26 Code does not specifically apply, I have used judgement in developing
and applying an accounting policy that results in information that is relevant and reliable. All
accounting policies applied are appropriate to North Lanarkshire Council’s circumstances and
have been consistently applied.
The methodology, significant assumptions, and data used in making accounting estimates are
reasonable, and have been properly reflected and disclosed in the financial statements in
accordance with the 2025/26 Code. Judgements made in making estimates have been based
on the latest available and reliable information. Estimates have been revised where there are
changes in the circumstances on which the original estimate was based or as a result of new
information or experience.
Going Concern Basis of Accounting
I have assessed North Lanarkshire Council’s ability to continue to use the going concern basis
of accounting and have concluded that it is appropriate. I am not aware of any material
uncertainties that may cast significant doubt on North Lanarkshire Council’s ability to continue
to adopt the going concern basis of accounting.
Assets 
All assets at 31 March 2026 of which I am aware have been reported in the financial
statements. 
All assets as at 31 March 2026 have been valued and / or indexed in line with the accounting
polices around asset valuations. 
I carried out an assessment at 31 March 2026 as to whether there is any indication that an
asset may be impaired and have recognised any impairment losses identified in the financial
statements.
I have provided you with all information of which I am aware regarding any valuation exercises
carried out after 31 March 2026. 
There are no plans or intentions that are likely to affect the carrying value or classification of
the assets recognised in the financial statements.
Owned assets are free from any lien, encumbrance, or charge, except as disclosed in the
financial statements.
Liabilities 
All liabilities at 31 March 2026 of which I am aware have been reported in the financial
statements. 
Provisions have been recognised in the financial statements for all liabilities of uncertain timing
or amount at 31 March 2026 of which I am aware where the conditions specified in IAS 37, as
adapted by the 2025/26 Code, have been met. The amount recognised as a provision is the
best estimate of the expenditure likely to be required to settle the obligation at 31 March 2026.
Where the effect of the time value of money is material, the amount of the provision has been
discounted to the present value of the expected payments. 
Page 14 of 64

Page 15

Provisions recognised in previous years have been reviewed and adjusted, where appropriate,
to reflect the best estimate at 31 March 2026, or to reflect material changes in the assumptions
underlying the calculations of the provisions.
The accrual recognised in the financial statements for annual leave untaken by 31 March 2026
has been estimated on a reasonable basis.
There are no plans or intentions that are likely to affect the carrying value or classification of
the liabilities recognised in the financial statements.
Contingent Liabilities
There are no significant contingent liabilities, other than those disclosed in Note 24 to the
financial statements, arising either under formal agreement or through formal undertakings
requiring disclosure in the financial statements. All known contingent liabilities have been fully
and properly disclosed in accordance with IAS 37, as adopted by the 2025/26 Code.
Litigation and Claims
All known actual or possible legal claims have been disclosed to you and have been accounted
for and disclosed in the financial statements in accordance with the 2025/26 Code.
Fraud
I understand my responsibilities for the design, implementation, and maintenance of internal
control to prevent fraud and I believe I have appropriately fulfilled those responsibilities.
I have provided you with all information in relation to:
• my assessment of the risk that the financial statements may be materially misstated
as a result of fraud,
• any allegations of fraud or suspected fraud affecting the financial statements, and 
• fraud or suspected fraud that I am aware of involving management, employees who
have a significant role in internal control, or others that could have a material effect on
the financial statements.
Laws and Regulations
I have disclosed to you all known instances of non-compliance or suspected non-compliance
with laws and regulations whose effects should be considered when preparing financial
statements.
Related Party Transactions
All material transactions with related parties have been appropriately accounted for and
disclosed in the financial statements in accordance with IAS 24, as adopted by the 2025/26
Code. I have made available to you the identity of all of North Lanarkshire Council’s related
parties and all the related party transactions of which I am aware.
Remuneration Report
The Remuneration Report has been prepared in accordance with the Local Authority Accounts
(Scotland) Regulations 2014, and all required information of which I am aware has been
provided to you.
Management Commentary
I confirm that the Management Commentary has been prepared in accordance with statutory
guidance, and the information is consistent with the financial statements. 
Page 15 of 64

Page 16

Corporate Governance
I confirm North Lanarkshire Council has undertaken a review of the system of internal control
during 2025/26 to establish the extent to which it complies with proper practices set out in
Delivering Good Governance in Local Government: Framework 2016. I have disclosed to you
all deficiencies in internal control identified from this review or of which I am otherwise aware.
I confirm that the Annual Governance Statement has been prepared in accordance with the
Delivering Good Governance in Local Government: Framework 2016 and the information is
consistent with the financial statements. There have been no changes in the corporate
governance arrangements, or issues identified, since 31 March 2026 which require to be
reflected in the Annual Governance Statement or annual accounts.
Group Accounts 
I have identified all the other entities in which North Lanarkshire Council has an interest and
have classified and accounted for them in accordance with the 2025/26 Code. Any significant
issues, including those related to fraud and any qualified audit opinions, in relation to the
financial statements of group entities, have been provided to you. Any significant issues
identified by you as group auditor have been communicated to management of group
components, where relevant to those components.
Events Subsequent to the Date of the Balance Sheet
All events subsequent to 31 March 2026 for which IAS 10, as adopted by the 2025/26 Code,
requires adjustment or disclosure have been adjusted or disclosed. 
Yours sincerely 
Greg Telfer
Chief Officer (Finance and Technology) 
Page 16 of 64

Page 17

North Lanarkshire Council
Report
Audit and Scrutiny Panel 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    GT/VR/FC Date 24/09/26 
Annual Accounts 2025/26 – External Auditor’s report to those
charged with Governance on the 2025/26 Audit 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail TelferG@northlan.gov.uk   
1. Background 
1.1 The Audit Commission appoint external auditors to local authorities in order to carry out
the audit of financial statements in accordance with International Standards on
Auditing. 
1.2 Recognising the importance of effective two-way communication in an audit of financial
statements, the International Standards on Auditing (ISA260 Communication with
those charged with governance) requires external auditors to communicate relevant
matters relating to their audit of financial statements to those charged with governance.
Such communications are required to be on a sufficiently prompt basis to enable those
charged with governance to take appropriate action. 
Executive Summary 
This report is presented to members to allow them to consider the external auditor’s
comments on specific matters arising from their audit of the financial statements for the
Council.
Recommendations
It is recommended that the Audit and Scrutiny Panel: 
(1) Acknowledge the External Auditor’s report to those charged with Governance on
the 2025/26 Audit and consider, as appropriate, the issues highlighted.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 5
Page 17 of 64

Page 18

1.3 The objectives of the auditors are to:
• Communicate clearly with those charged with governance the responsibilities of the
auditor in relation to the financial statement audit and an overview of the planned
scope and timing of the audit;
• Obtain from those charged with governance, information relevant to the audit;
• Provide those charged with governance with timely observations arising from the
audit that are significant relevant to their responsibility to oversee the financial
reporting process. This may include:
a) Their views on the qualitative aspects of the Council’s accounting and
financial reporting practices;
b) Significant difficulties, if any, encountered during the audit;
b) Material weaknesses, if any, in the design, implementation or operating
effectiveness of financial systems relating to the accounts;
c) Any unadjusted misstatements;
e) Any unexpected modifications to the auditor’s report on the accounts;
f) Any other relevant matters relating to the audit.
• Promote effective two-way communication between the auditor and those charged
with governance. 
2. Report 
2.1 The review of the 2025/26 accounts by Audit Scotland is now complete with the final
version of the accounts forming part of this meeting’s agenda. 
2.2 Following completion of their audit, Audit Scotland have produced a report to those
charged with governance on the 2025/26 Audit for North Lanarkshire Council, a copy
of which is attached to this report. 
2.3 A full Annual Report has been prepared by Audit Scotland and forms part of this
meeting’s agenda. 
3. Measures of success 
3.1  N/A 
4. Supporting documentation 
Appendix 1 Audit Scotland Report to Those Charged With Governance on the 2025/26
Audit – North Lanarkshire Council 
Greg Telfer
Chief Officer (Finance and Technology) 
Page 18 of 64

Page 19

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 19 of 64

Page 20

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 20 of 64

Page 21

8 Nelson Mandela Place, Glasgow, G2 1BT
Phone: 0131 625 1500 
Email: info@audit.scot
www.audit.scot 
Audit and Scrutiny Panel
24 September 2026
North Lanarkshire Council
Audit of the 2025/26 annual accounts
Independent Auditor’s Report
1.  My audit work on the 2025/26 annual accounts is now substantially
complete. Subject to receipt of a revised set of annual accounts for review
and final internal quality review, I anticipate being able to issue unmodified
audit opinions in the Independent Auditor's Report on 24 September 2026.
The proposed Independent Auditor’s Report is attached at Appendix A.
Annual Audit Report
2.  Under International Standards on Auditing in the UK (ISA (UK)), I am
required to report specific matters identified from the audit of the annual
accounts to those charged with governance of North Lanarkshire Council
in sufficient time to enable appropriate action. For North Lanarkshire
Council, those charged with governance is the Audit and Scrutiny Panel. I
present for the committee's consideration my draft Annual Audit Report on
the 2025/26 audit. The section headed "Significant findings and key audit
matters" sets out the issues identified in respect of the annual accounts,
including those that I am required to report to you. 
3.  The Annual Audit Report also sets out conclusions on the wider scope
areas that frame public audit as set out in the Code of Audit Practice.
4.  The Annual Audit Report will be issued in final form after the audit of the
annual accounts has been completed.
Uncorrected misstatements
5.  I also report to those charged with governance all uncorrected
misstatements in the annual accounts which I have identified during the
course of my audit, other than those of a trivial nature, and request that
these misstatements be corrected.
6.  There are three misstatements which I request be corrected. If
corrected, this would increase net expenditure by £6.458 million and
decrease the net assets in the Balance Sheet by the same amount. Full
details of the uncorrected errors are included in Appendix 2 of the Annual
Audit Report.
Page 21 of 64

Page 22

Other ISA (UK) matters
7.  In presenting this letter and the Annual Audit Report to the Audit and
Scrutiny Panel, I seek confirmation from those charged with governance
on the following matters: 
 if they are aware of any instances of actual, suspected, or alleged
fraud, 
 if they are aware of any subsequent events that have occurred
since the date of the financial statements,
 if they are content that the methods, assumptions, and data used in
making accounting estimates in the annual accounts are
appropriate, 
 if all related party relationships and transactions they are aware of
are reflected in the annual accounts, and
 if they are aware of any non-compliance with laws and regulations. 
8.  Any issues that I have identified from my audit in relation to other ISA
(UK) matters that I am required to report to those charged with
governance have been reported in the section headed “Other matters to
report” in the Annual Audit Report. 
Representations from the Section 95 Officer
9.  As part of the completion of the audit, I am seeking written
representations from the Chief Officer (Finance and Technology), who is
the Section 95 Officer, on aspects of the annual accounts, including the
judgements and estimates made.
10.  A draft letter of representations is attached at Appendix B. This should
be signed and returned to me by the Section 95 Officer with the signed
annual accounts prior to the Independent Auditor’s Report being signed. 
Outstanding matters
11.  There is one area where I still require additional information to
conclude on audit work, and this is identified below: 
 We have requested audit assurances from Strathclyde Pension
Fund’s auditors in respect of the information provided to the actuary
relating to North Lanarkshire Council. 
Page 22 of 64

Page 23

Independent auditor’s report to the members of North
Lanarkshire Council and the Accounts Commission
Reporting on the audit of the financial statements
Opinion on financial statements
I certify that I have audited the financial statements in the annual accounts
of North Lanarkshire Council and its group for the year ended 31 March
2026 under Part VII of the Local Government (Scotland) Act 1973. The
financial statements comprise the group and council only Comprehensive
Income and Expenditure Statements, the group and council only Balance
Sheets, the group  Movements in Group Reserves Statement and council
Movements in Reserves Statement, the group and council only Cash Flow
Statements, the council only Housing Revenue Account, the Council Tax
Income Statement, the Non Domestic Rates Income Statement, the
Sundry Accounts Statement and notes to the group and council only
financial statements, including material accounting policy information. The
financial reporting framework that has been applied in their preparation is
applicable law and UK adopted international accounting standards, as
interpreted and adapted by the Code of Practice on Local Authority
Accounting in the United Kingdom 2025/26 (the 2025/26 Code).
In my opinion the accompanying financial statements:
 give a true and fair view of the state of affairs of the council and its
group as at 31 March 2026 and of the income and expenditure of the
council and its group for the year then ended;
 have been properly prepared in accordance with UK adopted
international accounting standards, as interpreted and adapted by the
2025/26 Code; and
 have been prepared in accordance with the requirements of the Local
Government (Scotland) Act 1973, The Local Authority Accounts
(Scotland) Regulations 2014, and the Local Government in Scotland
Act 2003. 
Basis for opinion
I conducted my audit in accordance with applicable law and International
Standards on Auditing (UK) (ISAs (UK)), as required by the Code of Audit
Practice approved by the Accounts Commission for Scotland. My
responsibilities under those standards are further described in the
auditor’s responsibilities for the audit of the financial statements section of
my report. I was appointed by the Accounts Commission on 2 December
2022. My period of appointment is five years, covering 2022/23 to
2026/27. I am independent of the council and its group in accordance with
the ethical requirements that are relevant to my audit of the financial
statements in the UK including the Financial Reporting Council’s Ethical
Standard, and I have fulfilled my other ethical responsibilities in Page 23 of 64

Page 24

accordance with these requirements. Non-audit services prohibited by the
Ethical Standard was not provided to the council. I believe that the audit
evidence I have obtained is sufficient and appropriate to provide a basis
for my opinion.
Conclusions relating to going concern basis of accounting
I have concluded that the use of the going concern basis of accounting in
the preparation of the financial statements is appropriate.
Based on the work I have performed, I have not identified any material
uncertainties relating to events or conditions that, individually or
collectively, may cast significant doubt on the ability of the council and its
group to continue to adopt the going concern basis of accounting for a
period of at least twelve months from when the financial statements are
authorised for issue.
These conclusions are not intended to, nor do they, provide assurance on
the current or future financial sustainability of the council and its group.
However, I report on the council’s arrangements for financial sustainability
in a separate Annual Audit Report available from the Audit Scotland
website.
Risks of material misstatement
I report in my Annual Audit Report the most significant assessed risks of
material misstatement that I identified and my judgements thereon.
Responsibilities of the Chief Officer (Finance and Technology)
and Audit and Scrutiny Panel for the financial statements
As explained more fully in the Statement of Responsibilities, the Chief
Officer (Finance and Technology) is responsible for the preparation of
financial statements that give a true and fair view in accordance with the
financial reporting framework, and for such internal control as the Chief
Officer (Finance and Technology) determines is necessary to enable the
preparation of financial statements that are free from material
misstatement, whether due to fraud or error.
In preparing the financial statements, the Chief Officer (Finance and
Technology) is responsible for assessing the ability of the council and its
group to continue as a going concern, disclosing, as applicable, matters
related to going concern and using the going concern basis of accounting
unless there is an intention to discontinue the operations of the council
and its group.
The Audit and Scrutiny Panel is responsible for overseeing the financial
reporting process.
Page 24 of 64

Page 25

Auditor’s responsibilities for the audit of the financial
statements
My objectives are to obtain reasonable assurance about whether the
financial statements as a whole are free from material misstatement,
whether due to fraud or error, and to issue an auditor’s report that includes
my opinion. Reasonable assurance is a high level of assurance, but is not
a guarantee that an audit conducted in accordance with ISAs (UK) will
always detect a material misstatement when it exists. Misstatements can
arise from fraud or error and are considered material if, individually or in
the aggregate, they could reasonably be expected to influence the
decisions of users taken on the basis of these financial statements.
Irregularities, including fraud, are instances of non-compliance with laws
and regulations. I design procedures in line with my responsibilities
outlined above to detect material misstatements in respect of irregularities,
including fraud. Procedures include:
 using my understanding of the local government sector to identify that
the Local Government (Scotland) Act 1973, The Local Authority
Accounts (Scotland) Regulations 2014, and the Local Government in
Scotland Act 2003 are significant in the context of the council and its
group;
 inquiring of the Chief Officer (Finance and Technology) as to other laws
or regulations that may be expected to have a fundamental effect on the
operations of the council and its group;
 inquiring of the Chief Officer (Finance and Technology) and the Chief
Officer (Legal and Democratic) concerning the policies and procedures
of the councils and its group regarding compliance with the applicable
legal and regulatory framework;
 discussions among my audit team on the susceptibility of the financial
statements to material misstatement, including how fraud might occur;
and
 considering whether the audit team collectively has the appropriate
competence and capabilities to identify or recognise non-compliance
with laws and regulations.
The extent to which my procedures are capable of detecting irregularities,
including fraud, is affected by the inherent difficulty in detecting
irregularities, the effectiveness of the council’s controls, and the nature,
timing and extent of the audit procedures performed.
Irregularities that result from fraud are inherently more difficult to detect
than irregularities that result from error as fraud may involve collusion,
intentional omissions, misrepresentations, or the override of internal
control. The capability of the audit to detect fraud and other irregularities
depends on factors such as the skilfulness of the perpetrator, the
frequency and extent of manipulation, the degree of collusion involved, the Page 25 of 64

Page 26

relative size of individual amounts manipulated, and the seniority of those
individuals involved.
A further description of the auditor’s responsibilities for the audit of the
financial statements is located on the Financial Reporting Council's
website www.frc.org.uk/auditorsresponsibilities. This description forms part
of my auditor’s report.
Reporting on other requirements
Opinion prescribed by the Accounts Commission on the audited
parts of the Remuneration Report
I have audited the parts of the Remuneration Report described as audited.
In my opinion, the audited parts of the Remuneration Report have been
properly prepared in accordance with The Local Authority Accounts
(Scotland) Regulations 2014.
Other information 
The Chief Officer (Finance and Technology) is responsible for the other
information in the annual accounts. The other information comprises the
Management Commentary, Annual Governance Statement, Statement of
Responsibilities and the unaudited parts of the Remuneration Report. 
My responsibility is to read all the other information and, in doing so,
consider whether the other information is materially inconsistent with the
financial statements or my knowledge obtained in the course of the audit
or otherwise appears to be materially misstated. If I identify such material
inconsistencies or apparent material misstatements, I am required to
determine whether this gives rise to a material misstatement in the
financial statements themselves. If, based on the work I have performed, I
conclude that there is a material misstatement of this other information, I
am required to report that fact. I have nothing to report in this regard.
My opinion on the financial statements does not cover the other
information and I do not express any form of assurance conclusion
thereon except on the Management Commentary and Annual Governance
Statement to the extent explicitly stated in the following opinions
prescribed by the Accounts Commission.
Opinions prescribed by the Accounts Commission on the
Management Commentary and Annual Governance Statement
In my opinion, based on the work undertaken in the course of the audit:
 the information given in the Management Commentary for the financial
year for which the financial statements are prepared is consistent with
the financial statements and that report has been prepared in
accordance with statutory guidance issued under the Local Government
in Scotland Act 2003; and
Page 26 of 64

Page 27

 the information given in the Annual Governance Statement for the
financial year for which the financial statements are prepared is
consistent with the financial statements and that report has been
prepared in accordance with the Delivering Good Governance in Local
Government: Framework (2016).
Matters on which I am required to report by exception
I am required by the Accounts Commission to report to you if, in my
opinion:
 adequate accounting records have not been kept; or
 the financial statements and the audited parts of the Remuneration
Report are not in agreement with the accounting records; or
 I have not received all the information and explanations I require for my
audit.
I have nothing to report in respect of these matters.
Conclusions on wider scope responsibilities
In addition to my responsibilities for the annual accounts, my conclusions
on the wider scope responsibilities specified in the Code of Audit Practice,
including those in respect of Best Value, are set out in my Annual Audit
Report.
Use of my report
This report is made solely to the parties to whom it is addressed in
accordance with Part VII of the Local Government (Scotland) Act 1973
and for no other purpose. In accordance with paragraph 108 of the Code
of Audit Practice, I do not undertake to have responsibilities to members or
officers, in their individual capacities, or to third parties. 
John Boyd FCPFA
Audit Director
Audit Scotland
4th Floor
8 Nelson Mandela Place
Glasgow
G2 1BT  
Page 27 of 64

Page 28

Appendix B: Letter of Representations (ISA (UK) 580) 
John Boyd, Audit Director 
Audit Scotland
4th Floor
8 Nelson Mandela Place
Glasgow
G2 1BT
North Lanarkshire Council
Annual accounts 2025/26
Dear John,
This representation letter is provided in connection with your audit of the
annual accounts of North Lanarkshire Council and its group, (hereafter
referred to as North Lanarkshire Council) for the year ended 31 March
2026 for the purpose of expressing an opinion as to whether the financial
statements give a true and fair view and have been properly prepared, and
for expressing other opinions on the Remuneration Report, Management
Commentary, and Annual Governance Statement.
I confirm to the best of my knowledge and belief, and having made such
enquiries as I considered necessary, the following representations given to
you in connection with your audit of North Lanarkshire Council’s annual
accounts for the year ended 31 March 2026.
General
I have fulfilled my responsibilities for the preparation of the 2025/26 annual
accounts as set out in your 2025/26 Annual Audit Plan. All the accounting
records, documentation, and other matters which I am aware are relevant
to the preparation of the annual accounts have been made available to
you for the purposes of your audit. All transactions undertaken by North
Lanarkshire Council been recorded in the accounting records and are
properly reflected in the financial statements. 
I confirm that the effects of uncorrected misstatements are immaterial,
individually and in aggregate, to the financial statements as a whole. I am
not aware of any uncorrected misstatements other than those reported by
you.
Financial Reporting Framework
The annual accounts have been prepared in accordance with the Code of
Practice on Local Authority Accounting in the United Kingdom 2025/26
(2025/26 Code) and the requirements of the Local Government (Scotland)
Act 1973, the Local Government in Scotland Act 2003, and the Local
Authority Accounts (Scotland) Regulations 2014. 
Page 28 of 64

Page 29

In accordance with the Local Authority Accounts (Scotland) Regulations
2014, I have ensured that the financial statements give a true and fair view
of the financial position of North Lanarkshire Council at 31 March 2026
and the transactions for 2025/26.
Accounting Policies and Estimates
All material accounting policies applied are as shown in the note included
in the financial statements. The accounting policies are determined by the
2025/26 Code, where applicable. Where the 2025/26 Code does not
specifically apply, I have used judgement in developing and applying an
accounting policy that results in information that is relevant and reliable. All
accounting policies applied are appropriate to North Lanarkshire Council’s
circumstances and have been consistently applied.
The methodology, significant assumptions, and data used in making
accounting estimates are reasonable, and have been properly reflected
and disclosed in the financial statements in accordance with the 2025/26
Code. Judgements made in making estimates have been based on the
latest available and reliable information. Estimates have been revised
where there are changes in the circumstances on which the original
estimate was based or as a result of new information or experience.
Going Concern Basis of Accounting
I have assessed North Lanarkshire Council’s ability to continue to use the
going concern basis of accounting and have concluded that it is
appropriate. I am not aware of any material uncertainties that may cast
significant doubt on North Lanarkshire Council’s ability to continue to
adopt the going concern basis of accounting.
Assets 
All assets at 31 March 2026 of which I am aware have been reported in
the financial statements. 
All assets as at 31 March 2026 have been valued and / or indexed in line
with the accounting polices around asset valuations. 
I carried out an assessment at 31 March 2026 as to whether there is any
indication that an asset may be impaired and have recognised any
impairment losses identified in the financial statements.
I have provided you with all information of which I am aware regarding any
valuation exercises carried out after 31 March 2026. 
There are no plans or intentions that are likely to affect the carrying value
or classification of the assets recognised in the financial statements.
Owned assets are free from any lien, encumbrance, or charge, except as
disclosed in the financial statements.
Page 29 of 64

Page 30

Liabilities 
All liabilities at 31 March 2026 of which I am aware have been reported in
the financial statements. 
Provisions have been recognised in the financial statements for all
liabilities of uncertain timing or amount at 31 March 2026 of which I am
aware where the conditions specified in IAS 37, as adapted by the
2025/26 Code, have been met. The amount recognised as a provision is
the best estimate of the expenditure likely to be required to settle the
obligation at 31 March 2026. Where the effect of the time value of money
is material, the amount of the provision has been discounted to the
present value of the expected payments. 
Provisions recognised in previous years have been reviewed and
adjusted, where appropriate, to reflect the best estimate at 31 March 2026,
or to reflect material changes in the assumptions underlying the
calculations of the provisions.
The accrual recognised in the financial statements for annual leave
untaken by 31 March 2026 has been estimated on a reasonable basis.
There are no plans or intentions that are likely to affect the carrying value
or classification of the liabilities recognised in the financial statements.
Contingent Liabilities
There are no significant contingent liabilities, other than those disclosed in
Note 24 to the financial statements, arising either under formal agreement
or through formal undertakings requiring disclosure in the financial
statements. All known contingent liabilities have been fully and properly
disclosed in accordance with IAS 37, as adopted by the 2025/26 Code.
Litigation and Claims
All known actual or possible legal claims have been disclosed to you and
have been accounted for and disclosed in the financial statements in
accordance with the 2025/26 Code.
Fraud
I understand my responsibilities for the design, implementation, and
maintenance of internal control to prevent fraud and I believe I have
appropriately fulfilled those responsibilities.
I have provided you with all information in relation to:
 my assessment of the risk that the financial statements may be
materially misstated as a result of fraud,
 any allegations of fraud or suspected fraud affecting the financial
statements, and 
Page 30 of 64

Page 31

 fraud or suspected fraud that I am aware of involving management,
employees who have a significant role in internal control, or others
that could have a material effect on the financial statements.
Laws and Regulations
I have disclosed to you all known instances of non-compliance or
suspected non-compliance with laws and regulations whose effects should
be considered when preparing financial statements.
Related Party Transactions
All material transactions with related parties have been appropriately
accounted for and disclosed in the financial statements in accordance with
IAS 24, as adopted by the 2025/26 Code. I have made available to you the
identity of all of North Lanarkshire Council’s related parties and all the
related party transactions of which I am aware.
Remuneration Report
The Remuneration Report has been prepared in accordance with the
Local Authority Accounts (Scotland) Regulations 2014, and all required
information of which I am aware has been provided to you.
Management Commentary
I confirm that the Management Commentary has been prepared in
accordance with statutory guidance, and the information is consistent with
the financial statements. 
Corporate Governance
I confirm North Lanarkshire Council has undertaken a review of the
system of internal control during 2025/26 to establish the extent to which it
complies with proper practices set out in Delivering Good Governance in
Local Government: Framework 2016. I have disclosed to you all
deficiencies in internal control identified from this review or of which I am
otherwise aware.
I confirm that the Annual Governance Statement has been prepared in
accordance with the Delivering Good Governance in Local Government:
Framework 2016 and the information is consistent with the financial
statements. There have been no changes in the corporate governance
arrangements, or issues identified, since 31 March 2026 which require to
be reflected in the Annual Governance Statement or annual accounts.
Group Accounts 
I have identified all the other entities in which North Lanarkshire Council
has an interest and have classified and accounted for them in accordance
with the 2025/26 Code. Any significant issues, including those related to
fraud and any qualified audit opinions, in relation to the financial
statements of group entities, have been provided to you. Any significant Page 31 of 64

Page 32

issues identified by you as group auditor have been communicated to
management of group components, where relevant to those components.
Events Subsequent to the Date of the Balance Sheet
All events subsequent to 31 March 2026 for which IAS 10, as adopted by
the 2025/26 Code, requires adjustment or disclosure have been adjusted
or disclosed. 
Yours sincerely 
Section 95 Officer 
Page 32 of 64

Page 33

North Lanarkshire Council
Report 
Audit and Scrutiny Panel
Does this report require to be approved? ☐ Yes   ☒ No
Ref    RB/SL Date 24/09/26 
Best Value thematic audit: Asset Management  
From  Rachel Blair, Chief Officer (Legal, Democratic and Strategy)  
E-mail blairr@northlan.gov.uk 
Executive Summary
This report presents the outcome of the thematic Best Value audit on Asset Management,
specifically “How well councils are managing assets to achieve their corporate objectives and
respond to challenges around financial sustainability and climate change”. 
This audit has been undertaken as part of a national approach to auditing thematic aspects
of the statutory Best Value duty. This national approach was initially implemented during
2022/23, with the first thematic audit focussing on the leadership of the development of the
council’s strategic priorities. This was followed in year two by a thematic audit on workforce
innovation and in year three by a thematic audit on transformation. The thematic audit on
asset management is year four of the programme set by the Accounts Commission. 
Overall, the key messages in the outcome report following North Lanarkshire Council’s
thematic Best Value audit on Asset Management are extremely positive. The report
recognises the clear strategic framework provided by the Corporate Asset Management Plan
(CAMP) for managing and developing the council’s assets, and that the CAMP reflects post
pandemic working arrangements, changing population needs, future demand for services,
and net zero commitments. It also acknowledges the council’s consideration of the
affordability of its capital programme and asset management plans. 
In addition, the report recognises the proactive place-based approach the council has through
initiatives such as the community hub and housing investment programmes, and the
community asset transfer process, which bring together council services, partners, and third
sector organisations to strengthen referral pathways, make better use of community assets,
and co-ordinate investment in housing and regeneration to support more accessible, joined
up services, and improvements in health, wellbeing, and social inclusion. 
The Best Value outcome report also contains three audit recommendations for improvement,
for which management responses have been provided outlining the planned next steps and
actions. 
Recommendations
It is recommended the Audit and Scrutiny Panel: 
1) Review the outcome report following the thematic Best Value audit in line with the
Panel’s role to ensure oversight of the adequacy and effectiveness of the council’s
governance, risk management, and internal control frameworks and external audit
Item 6
Page 33 of 64

Page 34

1. Background 
1.1 A report to the Audit and Scrutiny Panel in February 2023 provided an outline of the
new national approach to auditing Best Value which came into effect as part of the
external auditor’s appointment for the five-year term from 2022/23. 
1.2 Under this approach: 
• Auditing Best Value is fully integrated within the wider annual audit, with findings
reported through the external auditor’s Annual Audit Report (AAR). 
• Thematic Best Value audit work is undertaken each year by the external auditor, in
line with Accounts Commission requirements, to provide assurance on areas of
risk or interest across Scotland at a defined point in time. 
• Each council’s Annual Audit Report (AAR) and thematic Best Value reports are
considered by the Accounts Commission once during the five-year external audit
appointment, informing a statutory report produced by the Controller of Audit under
Section 102(1) of the amended Local Government (Scotland) Act 1973. 
1.3  To date, outcome reports produced for the council as part of the national thematic Best
Value audit programme have covered: 
1.3.1 Leadership of the development of new strategic priorities - reported to the Audit and
Scrutiny Panel in October 2023 and the Policy and Strategy Committee in December
2023.   
Nationally the outcome report (Delivering for the future, why leadership matters),
following the audit of all 32 councils, was published by Audit Scotland in July 2024: 
https://audit.scot/uploads/2024-07/nr_240711_best_value_thematic_leadership.pdf 
1.3.2 Workforce innovation (how the council is responding to current workforce challenges
through building capacity, increasing productivity, and innovation) - reported to the Audit
and Scrutiny Panel in August 2024 and the Policy and Strategy Committee in
September 2024. 
Nationally the outcome report (Delivering for the future, responding to the workforce
challenge) following the audit of all 32 councils, was published by Audit Scotland in
August 2025:
https://audit.scot/uploads/2025-07/bv_250807_workforce_thematic.pdf 
1.3.3 Transformation (how councils are redesigning and delivering more efficient services to
achieve planned outcomes) - reported to the Audit and Scrutiny Panel and the Policy
and Strategy Committee in September 2025. 
arrangements, and
2) Note that, as the Audit and Scrutiny Panel is accountable to the Policy and Strategy
Committee as the parent committee, this report (and appendix) will be remitted to the
next Policy and Strategy Committee meeting for Elected Members’ oversight.
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Page 34 of 64

Page 35

Nationally the outcome report (Delivering for the future, how councils are redesigning
and delivering more efficient services) following the audit of all 32 councils, was
published by Audit Scotland in May 2026:
https://audit.scot/uploads/2026-05/ac_260521_bv_thematic_transformation.pdf 
1.4 Following the conclusion of the year four thematic Best Value audit on Asset
Management in North Lanarkshire, which was carried out by the external auditors
(Audit Scotland), this report herewith (and attached in Appendix A) presents the
outcome of the audit along with key findings and recommendations. 
2. Thematic Best value audit on Asset Management 
Scope of the audit 
2.1 The scope provided by the external auditors outlined that the 2026 thematic audit would
focus on assessing the council’s ability to demonstrate Best Value in Asset
management in three key areas: 
1. The extent to which the council has a clear asset management strategy and plans
that are affordable, and that align with its corporate objectives, new ways of
working, the changing needs of its population, and net zero commitments.
2. The extent to which the council’s governance and accountability arrangements
support effective asset management.
3. The extent to which the council has a robust approach to working with partners and
communities in managing its assets. 
2.2 The scope also outlined that the audit would focus on the council’s strategic approach
to asset management and capital investment and would not seek to examine all
aspects of asset management. The assets considered within scope were informed by
the council’s own asset management strategy and priorities. As a result, auditors
focused on those assets central to the delivery of the council’s strategic objectives. 
Approach to the audit 
2.3 In conducting the audit, a team of auditors from Audit Scotland carried out the following: 
• A review of relevant information already available in the public domain.
• A review of information gained from additional requests which were fulfilled by the
council.
• Meetings with relevant officers from across the council, including Chief Officers
responsible for asset management. 
Key messages 
2.4 Overall, the key messages from Audit Scotland are extremely positive - these are set
out in the outcome report in Appendix A and also noted in the extract below: 
1. North Lanarkshire Council’s Corporate Asset Management Plan provides a clear strategic
framework for managing and developing its assets. The plan is aligned with the Strategic
Capital Investment Programme and supports delivery of the council’s corporate priorities.
2. The Corporate Asset Management Plan reflects post-Covid hybrid working arrangements,
changing population needs and future demand for services, and links to the council’s ambition
to meet net zero commitments.
Page 35 of 64

Page 36

3. The council has sufficiently considered the affordability of its capital programme and asset
management plans whilst navigating substantial financial pressures.
4. The council has strong reporting and monitoring of its capital programme, but asset
management plan reporting needs improvement. The council recognises this and is taking
steps to address it. Its latest performance has improved against all relevant Local
Government Benchmarking Framework indicators compared to 2013/14. 
5. The council’s approach to community asset transfers (CAT) is clear and transparent. Ongoing
improvements to simplify procedures and enhance support help encourage more CAT
proposals. There are examples of engaging with communities in developing asset
management plans. However, the impact of this feedback on decision-making is not always
clear. 
6. The council takes a proactive place-based approach through initiatives such as the
community hub programme and housing investment programmes. It brings together council
services, partners and third-sector organisations to strengthen referral pathways, make better
use of community assets, and co-ordinate investment in housing and regeneration.  This
supports positive outcomes, including accessible, joined-up services and improved health,
wellbeing and social inclusion.   
Source: Thematic Best Value report, Audit Scotland, September 2026 
Improvement action plan 
2.5 The report contains three recommendations for improvement which are noted below. 
This includes management responses, including planned actions, responsible officers,
and timescales which are also detailed in the appendix to the external audit report
attached. 
Issue / risk Recommendation Agreed management action /
timing
1. Governance arrangements
in the Corporate Asset
Management Plan
The council’s Corporate Asset
Management Plan (CAMP) could
be strengthened by setting out
additional detail on the corporate
governance arrangements,
including key roles and
responsibilities. 
Risk: A lack of clarity regarding
review and reporting
arrangements may lead to
unclear accountability for
delivery of the CAMP, reducing
assurance that priorities remain
aligned with corporate
objectives.
The council should set out
further detail on the
governance arrangements
for corporate asset
management in its CAMP
to improve transparency
and accountability. This
should include key roles
and responsibilities,
reporting arrangements,
and how progress and
priorities will be reviewed
and aligned with corporate
objectives.
This will be reflected in the next
update to the CAMP which is
expected after the introduction of the
next Strategic Capital Investment
Plan (due at Policy and Strategy
Committee in December 2026).   
This will include consideration of
consolidated CAMP and associated
asset management plans (AMPs)
reporting and supporting governance
and monitoring arrangements to
strengthen oversight, accountability,
and assurance of asset
management delivery across the
council. 
Chief Officer (Assets and
Procurement)
September 2027
2. Performance reporting
The current performance
reporting arrangements do not
provide a comprehensive view of
performance across the council’s
asset portfolio. As a result, it is
difficult to assess overall
performance across different
asset classes or to understand
how delivery of the CAMP
contributes to the council's wider
strategic objectives and decision-
making. 
The council should
enhance the annual CAMP
update by bringing together
key performance
information, achievements,
risks and improvement
actions across asset
classes to demonstrate
progress against the plan's
objectives and enhance
strategic oversight.  
The council’s approach to reporting
of the CAMP and associated AMPs
will be reviewed with a view to
developing standardised reporting
arrangements, including common
themes, together with a template
and reporting schedule.   
Consideration will also be given to
the benefits to be gained from
introducing a consolidated annual
asset management report for the
council to provide a comprehensive
overview of performance, progress,
Page 36 of 64

Page 37

2.6 As part of the council’s Internal Audit monitoring arrangements, regular reports to the
Audit and Scrutiny Panel provide updates on progress in implementing
recommendations arising from the external auditors’ Annual Audit Reports (AARs).
This approach includes recommendations from thematic Best Value audits and, as
such, progress in implementing the agreed Asset Management improvement actions
will be monitored by Internal Audit and reported to future meetings of the Audit and
Scrutiny Panel through the existing process. 
3. Measures of success 
3.1  Key measures of success are:
• That the council is able to demonstrate Best Value in line with the requirements of
the Local Government in Scotland Act 2003 and the supporting statutory guidance.
• That the Audit and Scrutiny Panel fulfil their role in relation to commenting on the
scope and depth of external auditor work and ensuring it gives value for money. 
4. Supporting documentation 
4.1 Appendix A -  Audit Scotland thematic Best Value audit report - Asset Management: 
“How well councils are managing assets to achieve their corporate 
objectives and respond to challenges around financial sustainability and 
climate change”. 
Rachel Blair
Chief Officer (Legal, Democratic and Strategy) 
5. Impacts 
Risk: Limited performance
reporting may reduce strategic
oversight and accountability for
delivery of the CAMP.
risks and priorities across the
council’s asset portfolio. 
Chief Officer (Assets and
Procurement)
September 2027
3. Reporting on community
feedback 
The council’s consultation
summary reports do not always
clearly show how the council has
used the outcomes of
engagement with communities to
inform decision-making. 
Risk: Communities may have
limited assurance that their views
have been appropriately
considered, reducing
transparency and accountability.
The council could further
strengthen its reporting on
community engagement in
asset management by
clearly demonstrating how it
has considered and used
feedback from communities
to inform decision-making.
This could include showing
the extent to which
community views have
influenced asset
management plans and
related decisions.
Discussions will be undertaken
across all relevant services to
develop a consistent approach to
recording and reporting the
information derived from consultation
activity.   
This will support the development of
a standard process for
demonstrating how community
feedback has been considered and
how it has influenced asset
management plans and related
decision-making, strengthening
transparency and accountability. 
Chief Officer (Assets and
Procurement)
September 2027
Page 37 of 64

Page 38

5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
The legal impact in this report is only in relation to supporting demonstration of the
council’s compliance with the relevant legislation listed below.  It does not introduce
new legal duties or changes to the council’s statutory duty in this respect.
• The Local Government in Scotland Act 2003 introduced the statutory duty of
Best Value which requires the council to “make arrangements which secure Best
Value” and ensure “continuous improvement in the performance of the
authority’s functions”.
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒
Page 38 of 64

Page 39

If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
Demonstrating Best Value in line with statutory requirements supports the mitigation
of the risk on the Corporate Risk Register for governance, leadership, and decision
making.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the Armed
Forces community to make sure that they do not face disadvantage compared to
other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles
from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 39 of 64

Page 40

Best Value thematic work – Asset
management
North Lanarkshire
Council
How well councils are managing assets to achieve
their corporate objectives and respond to challenges
around financial sustainability and climate change 
Prepared by Audit Scotland
September 2026
Appendix A
Page 40 of 64

Page 41

Key messages | 2 
Page 41 of 64

Page 42

Best Value thematic work: North Lanarkshire Council | 3 
Contents 
Key messages 4
Introduction 5
1. Asset management planning 7
2. Governance and performance 12
3. Partnership working and community engagement 16
Appendix 21 
Accessibility
You can find out more and read this report using assistive technology on
our website www.audit.scot/accessibility.
Page 42 of 64

Page 43

Key messages | 4 
Key messages 
1 North Lanarkshire Council’s Corporate Asset Management Plan provides a
clear strategic framework for managing and developing its assets. The plan is
aligned with the Strategic Capital Investment Programme and supports
delivery of the council’s corporate priorities.
2 The Corporate Asset Management Plan reflects post-Covid hybrid working
arrangements, changing population needs and future demand for services,
and links to the council’s ambition to meet net zero commitments.
3 The council has sufficiently considered the affordability of its capital
programme and asset management plans whilst navigating substantial
financial pressures.
4 The council has strong reporting and monitoring of its capital programme, but
asset management plan reporting needs improvement. The council
recognises this and is taking steps to address it. Its latest performance has
improved against all relevant Local Government Benchmarking Framework
indicators compared to 2013/14. 
5 The council’s approach to community asset transfers (CAT) is clear and
transparent. Ongoing improvements to simplify procedures and enhance
support help encourage more CAT proposals. There are examples of
engaging with communities in developing asset management plans.
However, the impact of this feedback on decision-making is not always clear. 
6 The council takes a proactive place-based approach through initiatives such
as the community hub programme and housing investment programmes. It
brings together council services, partners and third-sector organisations to
strengthen referral pathways, make better use of community assets and co-
ordinate investment in housing and regeneration. This supports positive
outcomes, including accessible, joined-up services and improved health,
wellbeing and social inclusion.   
Page 43 of 64

Page 44

Introduction | 5 
Introduction 
1.  Asset management directly impacts how councils provide services and
achieve their own corporate priorities and longer-term financial
sustainability. Limited capital budgets make it challenging for councils to
maintain their existing assets and estates, invest in new assets and
achieve net zero targets. Exhibit 1 sets out some principles for effective
asset management, informed by CIPFA guidance and the Infrastructure
Investment Plan for Scotland.
Exhibit 1 
Principles for effective asset management
Principle What this looks like in practice
Strategic alignment
Councils’ asset management strategies align with their corporate
objectives, financial plans, new ways of working, population needs
and net zero commitments.
Investment hierarchy
To support sustainability and cost-effectiveness, asset management
strategies prioritise:
1. maintaining and optimising existing assets
2. repurposing or upgrading existing assets to meet the needs of the
community
3. new investment only when necessary
Monitoring condition
and performance
Councils regularly assess the condition, suitability and performance of
their assets, to help inform investment priorities and support
continuous improvement.
Governance and
accountability
Councils have clear roles and responsibilities for asset management,
with regular, transparent reporting and senior oversight.
Community asset
transfers
Councils have transparent and robust processes in place to assess
and support requests for community asset transfers.
Place-based
approaches
Councils collaborate across services and other public and third sector
organisations to manage assets as a collective resource across their
local area. This has the potential to achieve savings, better align
service provision and create opportunities for joint working. 
Source: Audit Scotland
Page 44 of 64

Page 45

Introduction | 6 
2.  The Code of Audit Practice sets out the requirements for Best Value
audit work. This report covers the thematic aspect of the Best Value audit
requirements. The Accounts Commission has directed auditors to report
on how well councils are managing their assets. In carrying out the work,
auditors have considered the following questions: 
• Part 1 – To what extent does the council have a clear asset
management strategy and plans that are affordable, align with its
corporate objectives, the changing needs of its population, and net
zero commitments?
• Part 2 – To what extent do the council’s governance and
accountability arrangements support effective asset management?
• Part 3 – To what extent does the council have a robust approach to
working with partners and communities in managing its assets?
3.  An improvement action plan is included at Appendix 1 of this report.
This sets out audit recommendations in key areas, and the council’s
planned response including responsible officers and dates for
implementation.
4.  The coverage of the work is in line with the expectations for council’s
arrangements for the seven Best Value themes in the Local Government in
Scotland Act 2003, Best Value Statutory Guidance 2020. 
Page 45 of 64

Page 46

1. Asset management planning | 7 
1. Asset management planning 
5.  Councils’ capital programmes are a necessary component of
modernising services to improve outcomes for local communities. Doing
this successfully requires good strategic medium- to long-term asset
management and planning. The Accounts Commission’s Local
government budgets 2025/26 briefing reported that capital funding for
2025/26 had increased but remained lower than in 2023/24 and that
investing in new buildings and assets is increasingly expensive. Councils
are relying on borrowing as the main source of funding for capital projects.
In 2025/26, councils intend to borrow £3.13 billion, an increase from
£2.67 billion in 2024/25.
Findings and evidence relating to the council’s asset management strategic
planning arrangements 
Judgements Evidence 
1. The council’s Corporate
Asset Management Plan
provides a clear strategic
framework for managing
and developing its assets.
It covers a sufficient period
enabling strategic
planning.
2. The council’s Corporate
Asset Management Plan
could be strengthened by
setting out additional detail
on the corporate
governance arrangements,
including key roles and
responsibilities. 
1. In May 2026, the council agreed a refreshed Corporate
Asset Management Plan (CAMP), covering the period of
2026-2031. This overarching strategic document refers to
the relevant CIPFA guidance and sets out the council’s
approach to and priorities for managing and developing its
assets. It supports the council’s ambition to bring together
all asset types ‘into a single, integrated estate which
operates as a cohesive base’. Progress is being made
towards this objective with community hubs demonstrating
how traditional boundaries between asset types (schools,
community, partner assets) can be removed to support
more integrated service delivery.
2. The CAMP covers the management of around 1,000
operational assets, including community hubs, schools,
care homes and office accommodation and outlines how
the approach taken supports service delivery. The CAMP
also provides a strategic overview of other major asset
classes such as housing, which is supported by a
dedicated Housing Asset Management Plan (HAMP)
2026-31. 
3. The CAMP briefly mentions that the council is planning to
‘review the plan annually and provide regular updates on
key areas to the relevant committees’. However, there is
an opportunity to provide further clarity on how progress Page 46 of 64

Page 47

1. Asset management planning | 8 
Judgements Evidence 
and priorities will be reviewed and aligned to achieve the
corporate objectives. The CAMP could be strengthened by
setting out additional detail on the corporate governance
arrangements. This includes key roles and responsibilities
as well as monitoring and reporting processes.
3. The council’s Corporate
Asset Management Plan
aligns with its corporate
objectives. It reflects post-
Covid hybrid working
arrangements, changing
population needs and
future demand for services,
while supporting the
council’s ambition to meet
its net zero commitments. 
1. There is clear alignment between the CAMP and the
council’s strategic priorities. The CAMP establishes the
strategic approach to asset management, with a stated
objective of supporting the vision and ambitions set out in
The Plan for North Lanarkshire. 
2. There is evidence that the council has considered the
changing population needs and future demand for
services. The CAMP includes the following initiatives:
• development of community hub-based service delivery
• investment in schools, housing and community
infrastructure
• support for integrated and place-based services
• digital transformation initiatives to make service delivery
more collaborative and responsive
3. There is evidence that the council has considered how its
assets can be optimised to reflect new ways of working
and providing services. For example, since 2017, the
council has been undertaking a programme of office
rationalisation and has delivered over £2 million in
efficiency savings to date. As co-location within community
hubs expands and more agile ways of working are
adopted, the council continues to reduce and consolidate
its office estate, improving asset utilisation and supporting
more efficient service delivery.
4. The CAMP clearly links to the council’s plan to meet its net
zero commitment. North Lanarkshire’s Path to Net Zero
(2045) prioritises actions that increase its buildings' energy
efficiency and reduce carbon emissions and energy
demand and identifies targets and timescales to achieve
those. 
5. Given the CAMP is a high-level strategic plan, detailed
information such as property condition, occupancy rates,
demographic and trend analysis is contained within
individual asset plans.
4. There is a clear link
between the Corporate
Asset Management Plan,
the council’s capital
1. The CAMP covers the same five-year period as the
council’s Strategic Capital Investment Programme and
both support the Programme of Work, its delivery
framework for achieving the ambitions of The Plan for Page 47 of 64

Page 48

1. Asset management planning | 9 
Judgements Evidence 
programme and asset
management plans.
North Lanarkshire. The CAMP supports capital investment
decisions and funding applications. One of the criteria for
submitting a capital funding bid is demonstrating that the
proposed expenditure aligns with the Corporate or Service
Asset Management Plan priority or supports the
Programme for Work (if it is a new investment proposal). 
2. Based on our review of the council’s HAMP and the Town
and Community Hub programme, there is a clear link
between the CAMP and those individual asset
management plans. They include specific actions and
timescales and are also linked to the capital programme.
5. The council
demonstrates a
commitment to affordability
in its capital programme
and has regularly reviewed
its key financial strategies
to keep its borrowing at an
affordable level. This
requires careful ongoing
monitoring.
1. Across Scotland, councils continue to operate in a
challenging financial landscape with ongoing cost
pressures, high interest rates, and economic uncertainty.
These conditions have a direct influence on borrowing
costs and the affordability of the capital programme. 
2. The CAMP recognises that the council's assets represent
the second largest areas of expenditure and states that
assets should be ‘well managed, maintained and fit for
current and future needs’. 
3. There is evidence that the council has sufficiently
considered affordability in capital investment and asset
management planning. 
• When developing community hubs, the council
prioritises refurbishing and adapting existing buildings
where possible. Decisions are based on factors such as
building conditions, community need, location and
delivery timescales, while it will also build new hubs
where required.
• The council actively considers how efficiently assets are
used, taking account of whole-life costs. Examples
include initiatives to improve asset utilisation rates and
reduce surplus capacity across the estate. The council
uses a Strategic Assessment Tool to evaluate property-
related proposals and options appraisals, supporting
informed decision-making.
• The Strategic Capital Investment Programme 2024/25 to
2028/29 provides details on the projected capital
resources available from various funding sources,
including capital grants and capital receipts, as well as
borrowing and undertakes risk assessments at a
strategic level. The council also has the Community
Investment Fund, a locally controlled source of capital
financing, as the main source of funding. It comes from
ringfencing elements of future council tax income Page 48 of 64

Page 49

1. Asset management planning | 10 
Judgements Evidence 
associated with housing growth and top slicing an
element of future council tax increases. The Fund aims
to create additional resources of £500 million over a ten-
year period to support capital programmes, reducing
reliance on external funding and borrowing. The
Programme has built in a corporate contingency of £8.7
million to help manage unforeseen costs and other risks
associated with programme delivery.
• As the Medium-Term Financial Plan 2027/28 to 2031/32
demonstrates, the council regularly carries out scenario
planning, considering ongoing service pressures and
other external and internal financial challenges
(including increased inflation and loan charges costs).
Under the envisaged scenario, it highlights a significant
funding gap of £75.545 million for the three-year budget
period from 2027/28 to 2029/30. It continues to monitor
affordability acknowledging that risks will require
ongoing careful management. 
• As reported in the council’s annual accounts, long-term
borrowing increased from £590.6 million in 2023/24 to
£774.9 million in 2025/26, a rise of 31 per cent over the
period. This was accompanied by an increase in annual
interest costs from £44.6 million to £58.2 million.
• The council’s 2026/27 Treasury Management Strategy,
which sets out its annual borrowing approach, indicates
that borrowing levels are expected to increase over the
next five years. For example, the proportion of financing
costs to net revenue is projected to rise from 5.4 per
cent in 2026/27 to 8.3 per cent in 2030/31. However, the
strategy sufficiently considers financing risks, including
economic conditions and fluctuating interest rates, and
the associated prudential indicators suggest that
borrowing levels will remain affordable and sustainable.
6. The council has taken a
proactive approach to
identify, monitor and
manage significant building
safety risks.
1. The council has a two-pronged approach to identify,
monitor and manage significant building safety risks
across its estate. First, it identifies risks through annual
condition surveys. Second, it manages and mitigates risks
through its corporate risk management framework. The
framework categorises risks at corporate, service and
project levels. For example, the council has identified a
medium corporate risk associated with reinforced
autoclaved aerated concrete (RAAC) and a moderate risk
relating to faster stock deterioration within its HAMP.
These risks are kept under regular review and the updates
are reported to the relevant committees. 
Page 49 of 64

Page 50

1. Asset management planning | 11 
Recommendations
The council should set out further detail on the governance
arrangements for corporate asset management in its Corporate Asset
Management Plan to improve transparency and accountability. This
should include key roles and responsibilities, reporting arrangements,
and how progress and priorities will be reviewed and aligned with
corporate objectives.
Judgements Evidence 
2. The council has identified properties with significant risks,
such as flammable cladding and RAAC, and maintains up-
to-date information about their condition. As reported on
its website, the council has assessed more than 400
corporate properties for RAAC, confirming its presence in
five. It also surveyed 13,785 sites and identified RAAC in
140 properties across 22 blocks. The council is taking
action to ensure safety through remedial works, demolition
where necessary, and continued monitoring. It also reports
specifically on RAAC to the relevant committees. For
example, it presented a report to the Housing Committee
in February 2025.
3. The council developed a Tower Strategy in 2017, re-
provisioning its tower estate over the next 25 years. This
included condition surveys, such as external cladding
assessments, demolitions/refurbishments and a fire safety
programme. The May 2026 Housing Committee report
noted good progress on demolitions, the fire safety
programme and major refurbishments. In addition, the
council has received funding for three Scottish
Government Cladding Remediation Programme Single
Building Assessments. This programme is not directly
related to the Grenfell Tower incident.
Page 50 of 64

Page 51

2. Governance and performance | 12 
2. Governance and performance 
6.  It is essential that the council has effective governance arrangements in
place to enable transparency, oversight and scrutiny of progress with
implementing its capital programme and asset management strategy. This
enables better-informed decision making and corrective action where
needed. 
Findings and evidence relating to the council’s governance arrangements and
performance 
Judgements Evidence
7. The council has strong
reporting and monitoring of
its capital programme but
asset management plan
reporting needs
improvement. 
1. The council has integrated leadership arrangements in
place for its capital programme and asset management
plan. 
• Responsibility of overseeing asset management plans is
distributed across five committees in line with each
committee’s remit. The Audit and Scrutiny Panel
oversees performance across the council. 
• At senior officer level, senior management teams, which
meet monthly, provide strategic oversight of asset
management and the capital programme. The Strategic
Capital Delivery Group, which meets quarterly, oversees
the council’s capital programmes. 
2. The council monitors progress against its capital budgets
for the General Fund and the Housing Revenue Account
and regularly reports to the Policy and Strategy
Committee, the Finance and Resource Committee and the
Housing Committee. There is evidence of sufficient
scrutiny and oversight in implementing the capital
programme at elected member and senior officer levels.
3. Reporting of performance against internal asset
management indicators is undertaken at service level
through a range of separate Performance Review reports
to relevant committees. Each performance report tracks
trends in KPIs and highlights progress and areas for
improvement and the Audit and Scrutiny Panel, which
oversees performance across the council, receives the
Performance Assurance Review report on a quarterly
basis. However, neither individual Performance Review Page 51 of 64

Page 52

2. Governance and performance | 13 
Judgements Evidence
reports nor Performance Assurance Review reports
provide a comprehensive view of performance across the
council’s asset portfolio. As a result, it is difficult to assess
overall performance across different asset classes or to
understand how delivery of the CAMP contributes to the
council's wider strategic objectives and decision-making.
There is an opportunity for the annual CAMP update to
provide additional strategic insight through bringing
together key performance information, achievements, risks
and improvement actions across asset classes. The
council’s 2026 self-evaluation recognised this as an area
for improvement and the council is taking steps to
demonstrate progress against the plan's objectives and
enhance strategic oversight.  
8. The council regularly
reports progress with its
capital programme while it
continues to face delivery
challenges.
9. The council is shifting
its focus from reactive
maintenance to planned
and prioritised
maintenance.
10.  The council’s most
recent performance shows
improvement across all
relevant Local Government
Benchmarking Framework
indicators compared to
2013/14. 
1. We highlighted in our 2024/25 Annual Audit Report that the
council’s capital programme continued to face delivery
challenges with capital spend being re-profiled.
2. In September 2025, the council reported that the final
General Services capital outturn for 2024/25 was
£119.439 million, representing 99 per cent of the original
budget. While this is an improvement on 2023/24, when
expenditure reached only 63 per cent of the original
budget, performance against the revised budget showed
no improvement, with the outturn accounting for 87 per
cent of the revised budget. The council continued to note a
number of significant reprofiling exercises conducted
during the year. It highlighted ongoing challenges in
delivering the capital programme such as staffing
shortages, contractor and supply chain issues, rising costs
and the need to prioritise externally funded projects.
Lessons learnt identified included stronger risk
management, improved stakeholder collaboration, and
more realistic planning and coordination arrangements.
3. For 2025/26, the council approved a capital programme of
£310 million, which was subsequently revised to £318
million. The latest monitoring report (as at 27 February
2026) shows slippage in programme delivery. The council
has delivered: 
• 80 per cent of the General Services capital programme
(£180.276 million revised budget), compared with a
target of 98 per cent of the projected outturn being
committed. 
• 75 per cent of the Housing Revenue Account capital
programme (£137.646 million revised budget),
Page 52 of 64

Page 53

2. Governance and performance | 14 
Judgements Evidence
compared with a target of nearly 100 per cent of the
projected outturn being committed.
4. The council is actively working to reduce reactive
maintenance by taking an integrated approach for repairs,
maintenance and investment across its assets.
Maintenance contracts are now in place for property and
roads, helping to support planned maintenance and
service continuity. The council is also improving digital
connectivity through its housing programme, which is
expected to reduce reactive maintenance requirements in
the medium term.  
5. For 2024/25, the council demonstrated improvement
against the relevant Local Government Benchmarking
Framework (LGBF) indicators compared to the baseline
year of 2013/14 (Exhibit 2). 
• The strongest improvement was in the percentage of
internal floor area of operational buildings in satisfactory
condition, which increased by 23 percentage points to
95 per cent. This performance was substantially
stronger than the family group average, which increased
by 13 percentage points to 92.5 per cent, and the
national average, which rose by ten percentage points
to 91 per cent. 
• While overall performance against the 2013/14 baseline
has improved, improvement in relation to the suitability
and condition of operational buildings has been modest,
increasing by only 0.4 percentage points. This compares
with increases of seven percentage points for the family
group average and eight percentage points for the
national average.
Page 53 of 64

Page 54

2. Governance and performance | 15 
Exhibit 2
Trend in performance against Local Government Benchmarking Framework indicators
North Lanarkshire Council has demonstrated improvement in 2024/25 compared to the baseline
year of 2013/14. 
Note: The latest available LGBF data for the proportion of council dwellings that are energy
efficient relates to 2021/22 across all councils. Consequently, it is not possible to assess the
council's performance against this indicator for subsequent years.
Source: Audit Scotland using Local Government Benchmarking Framework
Recommendations
The council should enhance the annual Corporate Asset Management
Plan update by bringing together key performance information,
achievements, risks and improvement actions across asset classes to
demonstrate progress against the plan's objectives and enhance
strategic oversight. 
Page 54 of 64

Page 55

3. Partnership working and community engagement | 16 
3. Partnership working and
community engagement 
7.  It is essential that councils consider how they can collaborate across
services and with other public and third sector organisations to manage
assets. This has the potential to achieve savings, better align service
provision and create opportunities for joint working. Councils should also
have transparent and robust processes in place for supporting and
assessing community asset transfer requests and engaging with their
communities on asset management plans and priorities.
Findings and evidence relating to the council’s partnership working and
community engagement arrangements 
Judgements Evidence 
11. The council has a clear
and ambitious plan for
service delivery, supported
by initiatives such as the
community hub programme
and Housing Investment
Programmes.
It brings council services,
partners and third-sector
organisations together to
provide more accessible
and joined-up services for
local communities.
1. The CAMP and The Plan for North Lanarkshire both
recognise the importance of working with communities,
public sector partners, third sector organisations and other
stakeholders to maximise the use of assets and improve
service delivery. Examples of partnership working in the
CAMP include: 
• Town and Community Hubs – the biggest long-term
project to replace or modernise older schools and
create community-focused buildings that bring
services together in one place.
• Office Rationalisation – changing how the council
uses its buildings with investment in a number of
community facilities used by council staff, partners
and the community.
• Housing and Regeneration - working with private
developers, housing associations and other partners
to increase affordable housing, improve the quality
and energy efficiency of existing homes and support
community regeneration.
• Learning Estate – 23 learning campuses are owned
and managed through a private public partnership.
Page 55 of 64

Page 56

3. Partnership working and community engagement | 17 
Judgements Evidence 
• Commercial Estate – The Centre Cumbernauld is
owned by the council and is currently occupied by
retailers and third sector organisations. 
2. To strengthen partnership working, the council adopted its
Leadership and Operating Model in 2021. The model sets
out a ten-year plan to move from traditional office-based
working to a more flexible, community-focused approach.
Through this model, the council has been working
collaboratively with a wide range of partners, including
NHS Lanarkshire, education providers, third-sector
organisations, community groups, sports clubs and other
local partners.
3. The council reports progress every six months to the Policy
and Strategy Committee. The latest update, published in
June 2026, highlighted several benefits of the community
hubs. For example, the hubs in Chryston, Riverbank and
Newmains and St Brigid have helped partner
organisations improve referral pathways, reduce
duplication and make better use of community assets.
They have also supported early intervention, increased
community participation and enhanced health, wellbeing,
employability, family support and digital inclusion services.
As a result, local residents have benefited from more
accessible and joined-up services, leading to stronger
community connections and improved health, wellbeing
and social inclusion outcomes. Since the start of the
programme in March 2020, the council has developed four
community hubs and plans to open a further four hubs in
2026.
12. The council has a
framework that sets out its
approach to involving
communities in decisions
that affect them. There are
examples of community
engagement in the
development of asset
management plans.
However, it is not always
clear how feedback from
these engagements has
influenced decision-
making. 
1. The council approved its overarching framework for
community engagement, the Working with Communities
Framework, in 2019. It sets out how it works with
communities and involves them in decisions that affect
them. This includes asset management. The framework is
based on the council’s Trust Model, which aims to ensure
that engagement happens at the right time, involves the
right people, has a clear purpose, encourages shared
responsibility and is tailored to local community needs.
The council is currently reviewing the framework. It is
expected to be updated by the end of 2026. The revised
framework is intended to be more flexible, responsive to
local communities and inclusive of all communities. 
2. The council regularly engages with communities through
public consultations published on its website. Recent
examples we reviewed include those on the Bellshill, Page 56 of 64

Page 57

3. Partnership working and community engagement | 18 
Judgements Evidence 
Kilsyth and Shotts Town Action Plans, the HAMP and the
Cumbernauld Town Centre Regeneration project. The
council has published detailed consultation reports.
However, those reports do not always clearly show how
the council has used the outcomes of engagement to
inform decision-making. 
13. The council has a clear
and transparent approach
to supporting and
assessing community
asset transfer requests.
Additional resourcing has
contributed to an increase
in community asset
transfer applications.
1. The council has clear governance arrangements on
community asset transfer (CAT). The Communities
Committee oversees CAT, including approving CAT
requests, as well as reviewing any refusals. An officer-led
Corporate Community Ownership and Management of
Assets Group, made up of senior officers from relevant
council services, assesses applications and a Community
Asset Leadership Group, made up of Chief Officers,
makes recommendations to support the Committee’s
decision-making. The Communities Committee receives
annual updates in line with Scottish Government guidance
for local authorities. These updates also form part of the
Performance Assurance Review submitted to the Audit
and Scrutiny Panel, which oversees performance and are
published on the council’s website. The 2025/2026 annual
report is expected in August 2026.
2. The council’s website provides helpful information for
communities. It helps increase transparency of the CAT
assessment and scoring process. For example, it includes:
• a short explanatory video outlining how the CAT
process works in practice, such as how applications
are assessed and decisions are made
• a dedicated council contact and links to external
support organisations, such as Development Trusts
Association Scotland (DTAS), Community Ownership
Support Service and the Scottish Government
• the Equality Impact Assessments completed for all
CAT requests
• decision notices and committee reports.
3. The CAMP actively encourages CAT requests and sets out
an intention to increase the number of applications. In
June 2024, the council updated its Community Ownership
and Management of Council-Owned Assets Policy
(available on the council’s website) and approved
additional resourcing to further support community groups
to make better use of local assets through the formal CAT
process or through alternative arrangements.   Page 57 of 64

Page 58

3. Partnership working and community engagement | 19 
Case study
Continuous improvements to the Community Asset Transfers approach 
The council secured funding through the UK Shared Prosperity Fund and
established a support fund to help community groups develop robust,
evidence-based Community Asset Transfer (CAT) proposals. 
Between 2023/24 and 2025/26, the fund supported 24 community groups,
distributing £95,240 to enable essential development work, including
feasibility studies, condition surveys and business planning.
The council is using end-of-project reports to capture outcomes, identify
lessons learned and inform ongoing improvements to the CAT process. It
indicated that groups accessing the fund were better equipped to progress
CAT applications, secure external funding and develop sustainable
community-led projects. 
Judgements Evidence 
4. The updated policy helps clarify the CAT processes. It
defines the roles of community and voluntary
organisations, elected members, council staff and senior
officers to support the effective implementation. It also
includes a structured assessment framework and scoring
matrix to ensure consistency and transparency in
decision-making.
5. The council has also temporarily increased resources for
CAT. It has created two Community Capacity Officer posts
to provide dedicated support to community groups
interested in the CAT process. In addition, it has
introduced a £2.3 million Community Asset Transfer Fund
to enable community groups to bid for funding to
undertake essential preparatory work such as business
planning, valuations, surveys and feasibility studies for
assets to be transferred (Case study).
6. Since 2017 when the updated national guidance became
available, there have been six full CATs completed
through the CAT process, alongside 16 leases and ten
transfers through other mechanisms. Since updating the
policy in June 2024, the council has received twelve new
CAT requests – double the number received during the
previous four years (2020-2024). The council is currently
reviewing the CAT process with the completion expected
in August 2026. Through the review, it aims to streamline
the process and strengthen consistency and alignment
with council priorities.
Page 58 of 64

Page 59

3. Partnership working and community engagement | 20 
Building on the success of the fund, the council has included a £2.3 million
Community Asset Fund within its Strategic Capital Investment Programme
2024/25 to 2028/29. This investment demonstrates the council’s
commitment to continuous improvement by reducing barriers to
participation, strengthening community capacity and supporting long-term
sustainability of the community-owned assets. 
Source: Audit Scotland
Recommendations
The council should further strengthen its reporting on community
engagement in asset management by clearly demonstrating how it has
considered and used feedback from communities to inform decision-
making. This could include showing the extent to which community
views have influenced asset management plans and related decisions.
Page 59 of 64

Page 60

Appendix | 21 
Appendix
Improvement action plan
Issue/risk Recommendation
Agreed management
action/timing
1. Governance arrangements
in the Corporate Asset
Management Plan
The council’s Corporate Asset
Management Plan (CAMP) could
be strengthened by setting out
additional detail on the corporate
governance arrangements,
including key roles and
responsibilities. 
Risk – A lack of clarity regarding
review and reporting
arrangements may lead to
unclear accountability for delivery
of the CAMP, reducing assurance
that priorities remain aligned with
corporate objectives.
The council should set out
further detail on the
governance arrangements for
corporate asset management
in its CAMP to improve
transparency and
accountability. This should
include key roles and
responsibilities, reporting
arrangements, and how
progress and priorities will be
reviewed and aligned with
corporate objectives.
This will be reflected in
the next update to the
CAMP which is expected
after the introduction of
the next Strategic Capital
Investment Plan (due at
Policy and Strategy
Committee in December
2026).  
This will include
consideration of
consolidated CAMP and
associated asset
management plans
(AMPs) reporting and
supporting governance
and monitoring
arrangements to
strengthen oversight,
accountability, and
assurance of asset
management delivery
across the council.
Chief Officer (Assets and
Procurement)
September 2027
Page 60 of 64

Page 61

Appendix | 22 
Issue/risk Recommendation
Agreed management
action/timing
2. Performance reporting
The current performance
reporting arrangements do not
provide a comprehensive view of
performance across the council’s
asset portfolio. As a result, it is
difficult to assess overall
performance across different
asset classes or to understand
how delivery of the CAMP
contributes to the council's wider
strategic objectives and decision-
making. 
Risk – Limited performance
reporting may reduce strategic
oversight and accountability for
delivery of the CAMP.
The council should enhance
the annual CAMP update by
bringing together key
performance information,
achievements, risks and
improvement actions across
asset classes to demonstrate
progress against the plan's
objectives and enhance
strategic oversight.  
The council’s approach
to reporting of the CAMP
and associated AMPs will
be reviewed with a view
to developing
standardised reporting
arrangements, including
common themes,
together with a template
and reporting schedule. 
Consideration will also be
given to the benefits to
be gained from
introducing a
consolidated annual
asset management
report for the council to
provide a comprehensive
overview of performance,
progress, risks and
priorities across the
council’s asset portfolio.
Chief Officer (Assets and
Procurement)
September 2027
Page 61 of 64

Page 62

Appendix | 23 
Issue/risk Recommendation
Agreed management
action/timing
3. Reporting on community
feedback 
The council’s consultation
summary reports do not always
clearly show how the council has
used the outcomes of
engagement with communities to
inform decision-making.
Risk – Communities may have
limited assurance that their views
have been appropriately
considered, reducing
transparency and accountability. 
The council could further
strengthen its reporting on
community engagement in
asset management by clearly
demonstrating how it has
considered and used
feedback from communities to
inform decision-making. This
could include showing the
extent to which community
views have influenced asset
management plans and
related decisions.
Discussions will be
undertaken across all
relevant services to
develop a consistent
approach to recording
and reporting the
information derived from
consultation activity. 
This will support the
development of a
standard process for
demonstrating how
community feedback has
been considered and
how it has influenced
asset management plans
and related decision-
making, strengthening
transparency and
accountability. 
Chief Officer (Assets and
Procurement)
September 2027 
Page 62 of 64

Page 63

Best Value thematic work – Asset management
North Lanarkshire Council
How well councils are managing assets to achieve their
corporate objectives and respond to challenges around
financial sustainability and climate change 
Audit Scotland, 4th Floor, 102 West Port, Edinburgh EH3 9DN
Phone: 0131 625 1500 Email: info@audit.scot
www.audit.scot 
AS.5.0
Page 63 of 64

Page 64

Page 64 of 64