Democracy Spraffa

Agenda Document Pack - Adult Care and Social Work Committee - 12/11/2024

North Lanarkshire Council · 12 November 2024
Back to Adult Care and Social Work Committee — 12 November 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

1 November 2024 
Members of the 
Adult Care and Social Work Committee
Chief Executive’s Office
Archie Aitken
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk 
Notice is given that a Meeting of the Adult Care and Social Work Committee is to be held
in the Council Chamber, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on Tuesday,
12 November 2024 at 14:00 PM which you are requested to attend. 
The agenda of business is attached. 
Archie Aitken
Chief Officer (Legal & Democratic) 
Members : 
Clerk Name: Clare Louise McDonald
Clerk Telephone: 01698 302190
Clerk Email: mcdonaldcl@northlan.gov.uk 
M McCulloch, A McCrory, D Ashraf, C Barclay, B Baudo, M Boyd, G Brennan, B Burgess, A
Bustard, J Cairns, W Goldie, H Gray, J Jones, K Larson, B McCulloch, R McKendrick, C
McManus, C Quigley, N Shevlin, L Stubbs, R Sullivan, J Toner, C Williams, N Wilson, G
Woods.  
Page 1 of 214

Page 2

Page 2 of 214

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical
Standards In Public Life Etc. (Scotland) Act 2000   
Operational   
2 Getting it Right for Everyone (GIRFE)
Submit report by Chief Officer (Adult Social
Work Services) endorsing the GIRFE Pathfinders
journey and seeking agreement to develop the
prototypes for practice solutions and principle
responses identified through GIRFE engagement
process. 
7 - 22 
3 Care Academy
Submit report by Chief Officer (Performance, Planning
and Quality Assurance) providing an update on the
Care Academy. 
23 - 28 
4 Review of Commissioned Registered Social
Landlord Provision
Submit report by Chief Officer (Performance, Planning
and Quality Assurance) providing an update on the
Review of Commissioned Register Social Landlord
Provision. 
29 - 36 
5 Cost of Living Helpline
Submit report by the Chief Social Work Officer
(Education, Families, Justice and Integrated Practice)
informing of the income maximisation work carried
out  by the Cost of Living Helpline (Tackling Poverty
Team) and Council Services during the period 2023/24. 
37 - 58 
6 Quality Assurance Annual Report 2023/24
Submit report by the Chief Officer (Performance,
Planning and Quality Assurance) providing the annual
report on Quality Assurance Activity for the period from
1 April 2023 to 31 March 2024. 
59 - 114 
7 Annual Report of the Chief Social Work Officer
2023/24
Submit report by the Chief Social Work Officer
(Children, Families, Justice and Integrated Practice)
seeking approval of the Annual Report of the Chief
Social Work Officer 2023/24 
115 - 170
Page 3 of 214

Page 4

Performance   
8 Adult Social Care Performance Report - Quarter 1
2024/25
Submit report by Chief Officer (North Lanarkshire
Health and Social Care Partnership) providing an
update on the performance of key areas of
activity within Adult Health and Social Care for the
period from 1 April 2024 to 30 June 2024 (Quarter 1
2024/25). 
171 - 182  
Financial   
9 Revenue & Capital Budget Monitoring Report:
Adult Social Care Period 6: 01/04/2024 to
13/09/2024
Submit report by Chief Officer (Planning, Performance
and Quality Assurance) providing a summary of the
revenue financial performance of the Health and
Social Care Partnership (H&SCP) - North Lanarkshire
(Adult Social Care and Housing) and the
financial performance of the Social Work Capital
Programme for the period from 1 April 2024 to 13
September 2024. 
183 - 194  
Contracts   
10  Contract Award for Independent Advocacy (Adults)
Submit report by Chief Officer (Performance, Planning
and Quality Assurance) seeking approval to award the
contract for the Independent Advocacy
Services (Adults). 
195 - 204 
11  Contract Award for Mental Health Peer Support and
Short - Term Mental Health Support Service
Submit report by Chief Officer (Adult Social
Work Services) seeking approval to award the contract
for the Mental Health Peer Support and Short-Term
Mental Health Support Service. 
205 - 214 
12  Contract Award for Support for Unpaid Carers and
Young Carers
Submit report by Chief Officer (Performance, Planning
and Quality Assurance) seeking approval to award the
contract for the Support for Unpaid Carers and Young
Carers (copy to follow). 
Page 4 of 214

Page 5

Page 5 of 214

Page 6

Page 6 of 214

Page 7

North Lanarkshire Council
Report
Adult Care and Social Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    DF/MF/AMCG Date 12/11/24 
Getting It Right for Everyone (GIRFE) 
From  Diane Fraser, Chief Officer / Head of Service (Adult Social Work Services)  
E-mail FraserDi@northlan.gov.uk Telephone 
Executive Summary 
Getting it Right for Everyone is a proposed national multi-agency approach to
support and services from young adulthood to end of life care which the Scottish
Government is co-designing with place-based pathfinders. Health and Social Care
North Lanarkshire is a place-based pathfinder for older people and frailty. This report
provides an update on the national work as well as detail on the approach locally
including how the work aligns with and enhances local practices. 
Recommendations 
It is recommended that the Adult Care and Social Work Committee: 
(1) Endorse the Getting It Right for Everyone Pathfinder journey and approve the next
steps.
(2) Endorse the testing of prototypes in multidisciplinary operational practice, through:
• The provision and deployment of existing resources to ensure capacity,
providing support and challenge via the Back-to-Basics governance structure to
measure the learning.
• Embedding the Getting it Right for Everyone principles and subsequent practice
and ways of working underpins the Back-to-Basics/enabling approach.
(3) Receive future reports with the national pathfinder learning. 
The Plan for North Lanarkshire
Priority  Enhance participation, capacity, and empowerment across our
communities
Ambition statement
(13) Improve preventative approaches including self-management
and giving people information and choice over supports and
services
Programme of Work Resilient People
Item 2
Page 7 of 214

Page 8

1. Background 
1.1 Getting it Right for Everyone is a proposed multi-agency approach to support and
services from young adulthood to end of life care which the Scottish Government is co-
designing with place-based pathfinders. Health and Social Care North Lanarkshire
North Lanarkshire is a place-based pathfinder for older people and frailty. 
1.2 The Getting it Right for Everyone approach is often referred to using the acronym
GIRFE but our preference to ensure accessibility and commitment to the concept is to
use the words in full.
1.2 From the inception of getting it right for everyone in 2022/23 and recruitment of
pathfinders, the aim was to publish the ‘team around the person’ toolkit by Autumn
2024. 
1.3 The Scottish Government also sought to work with pathfinders and partners to develop
the digital requirements to support the work and the culture and leadership
requirements to support implementation.
1.4 North Lanarkshire’s commitment to getting it right first time, supporting a well-equipped
and confident workforce and promoting engagement and participation made the
opportunity to contribute nationally to shaping the model to deliver very welcome.
1.5 Given the range of financial and demographic challenges faced locally as well as
nationally, involvement in the work as a pathfinder was also welcome in shaping
improved population health and wellbeing, reducing health inequalities, and creating
sustainable health and care services.  
1.6 The following section of the report details specifically the work of the North Lanarkshire
pathfinder that has been ongoing since January 2023, a set of proposed options to
operationalise getting it right for everyone within the Back-to-Basics programme and
subsequent next steps and recommendations for approval by CORE and IJB. 
2. Report 
Current position 
2.1 The Pathfinder programme began in January 2023 and is underpinned by a co-design
approach including: 
• Design School - a support model which can help teams to come together, get ready
for co-design work, and engage people with lived experience on a specific policy
area, problem exploration or redesign challenge.
• Learning Networks to support a national practice model. 
2.2 There are eleven place-based pathfinders across Scotland aligned to five thematic
areas: 
1. People in prisons
2. People in addiction services
3. People registered at deep end GP Practices
4. Families with multiple and/or complex needs and young people in transition from
GIRFEC to GIRFE
Page 8 of 214

Page 9

5. Older people and frailty  
2.3 The North Lanarkshire pathfinder was geared towards a focus on frailty given the
population projections of North Lanarkshire and need to reduce demand for and
pressure on health and social care services. The vision set out in the Strategy for
Preventing and Managing Frailty 2023-2028 describes a clear commitment to working
together across health, public health, social care, housing, community, and voluntary
organisations, and with older people and those who are important to them, to help them
age well and live longer in good health. The strategy embraces the Getting it Right For
Everyone principles and the vision and commitment to new ways of working
underpinned the work of the pathfinder from the outset. 
2.4 The North Lanarkshire pathfinder work sought to achieve three main things.
1. To understand people’s experiences of accessing health and social care
services in a range of different settings, across thematic areas and focused
geographically on Wishaw (although wider engagement took place). 
2. To embed their expertise and knowledge into the final version of the principles
and elements of a national toolkit that would support the approach at a local
level. 
3. To ensure, through the governance structure adopted, continued alignment with
the Strategic Commissioning Plan programme of work and delivery plan for
Back to Basics, that adopts the Human Learning Systems approach. 
2.5 The pathfinder team worked to a national timeline of activity as shown in Appendix 1,
concurrently the partnership has been developing the ‘Back to Basics’ transformation
programme within the Strategic Commissioning Plan Programme of Work.  The
governance structure put in place to support the pathfinder is shown in Appendix 2. 
2.6 The co-design process with people from North Lanarkshire communities, including
those with lived experience and expertise in delivering services, has allowed deep and
rich collaboration to consider the principles and how they should be both expressed
and the thematic areas, and how they should be implemented. 
2.7 Appendix 3 provides a high-level view of the reach of engagement and co-design, and
Appendix 4 illustrates the high-level themes captured during the early co-design work. 
Image 1.0 below outlines the initial themes the pathfinder was asked to focus on to the
specific prototypes that were tested. All feedback on prototypes was captured and
submitted to the national policy team and design school on 3rd June 2024.  Appendix
5A and 5B illustrate the prototypes on a page.
Image 1.0 Initial themes to prototypes for testing. 
Page 9 of 214

Page 10

2.8 Members of the North Lanarkshire pathfinder team presented to the steering group on
23 May 2024 and attended a series of collaborative sense making workshops, with all
pathfinders, to refine the prototypes further with final feedback submitted on 19th June
to the National policy team and design school. 
2.9 Consequently, the pathfinder facilitation team recognise the need to take forward the
learning from the pathfinder work and agree the next steps in line with back-to-basics
programme and operationalising of the enabling approach. 
2.10 Specifically, the enabling approach incorporates elements of prototype 2 relative to
ageing well, assessment and planning mechanisms, how the multi-disciplined team
across health, public health, social care, housing, community and voluntary
organisations work together and the role of the ‘sticky person’ and the community
connectors (my plan, my team, personal network discussion, care co-ordinator).
Furthermore, community hubs and their underpinning principles as prototype 1 provide
a delivery vehicle to strengthen the delivery of more integrated supports and services
within our communities augmenting our locality model. Community Hubs are a key
priority for the North Lanarkshire Partnership Strategic Leadership Board. The options
for taking this forward are detailed in the next section of the report. 
Current situation including options and implications. 
2.11  The Pathfinder in the partnership is now at the stage to work with identified staff in
localities to take forward the learning from the co-design process and  agree the
next operational steps.  That is, progress the prototypes and making them real through
working with designated staff and families in our communities.
Explanation of prototypes: 
2.12 The North Lanarkshire Pathfinder has been asked to undertake further testing of these
prototypes.  In this instance, ‘prototype’ refers to practice solutions and principles in
response to the difficulties people with lived experience have identified through the
engagement process. Testing at this stage will involve continuing to develop these
prototypes through an ongoing process of co-design and co-production with people
who have lived experience, including seldom heard voices, with staff across the Health
and Social Care Partnership and with colleagues in the community and voluntary
sector.  Next steps will include developing a plan to further test the prototypes in
practice.  A toolkit to support operational testing developed by the Scottish Government
is to be released in Autumn 2024. 
2.13 The North Lanarkshire Pathfinder will focus on the following prototypes during the next
phase of testing:
2.13.1 My plan – a document for anyone who wants to record details of their plan with the aim
of removing the perceived need for people to ‘retell their stories’ multiple times. This
includes living well, ageing well, and dying well. 
Areas for further development of this prototype include determining governance
arrangements and ensuring General Data Protection Regulation compliance. A
demonstrator will be undertaken in Airdrie and Wishaw to embed the getting it right for
everyone principles across a variety of services and supports that deliver preventative
and early intervention (Access Social Work, Home Assessment Team, Home Support
Reablement, Community Nursing, Integrated Rehab Teams). It is envisaged this will
improve access and change/adjust first point of contact including robust screening and
Page 10 of 214

Page 11

allocation through multidisciplinary team conversations/activity through the enabling
approach. It is hoped by this way of working that this will reduce waiting times for
people, embed the team approach around the person and their plan and eradicate
unnecessary referrals.
2.13.2 My team – people having a network of friends, family, and professionals as an integral
component to ensuring health and well-being, with people getting the right support at
the right time.
The further development of this prototype includes consideration of how this will be
recorded and shared, including the format this may take. This will be further tested as
outlined above in the Airdrie and Wishaw demonstrator.
2.13.3 Co-ordinator – the importance of having a consistent, named person who acts as a
clear point of contact is an approach being developed locally which fits well with the
Pathfinder work. A named professional, who “pulls in” additional expertise where
needed rather than “passes on,” ensures that a multi-disciplinary approach works
effectively around a person to support achieving their outcomes and maximising
independence rather than creates a confusing range of disjointed responses.
2.13.4 Community Hub Principles – clarity of vision for a community hub that underpins
delivery of a facility and what it hopes to achieve for a community.  The primary focus
here involves principles which will support the development of Hubs which reflect local
needs and where people can connect with public services and with local people
involved in both service delivery and decision making. It should be noted that the
Council has an approved set of hub guiding principles so the intention here would be
to build upon active work being undertaken in Newmains and St Brigid’s Community
Hub, Riverbank and Chryston.
Further development of this prototype includes identifying what community supports
and services can be delivered through the hub, in reach and outreach, as well as the
development of performance indicators to determine the impact of support on the health
and well-being of the communities they serve.
2.13.5 Dementia practice - Additionally, we have agreed to consider staff competencies in
supporting people with dementia post diagnosis. We understand that families can
sometimes have extended wait on supports and this can be a challenging time so can
we consider ‘waiting well.’ We will work with staff across Home Support and Integrated
Day Services in gathering data re training/development and competencies and whether
this meets expectations as required in the Dementia Strategy. 
2.13.6 GIRFEC to GIRFE (Moving On) - Working with our Education and Families colleagues
to consider this important transition stage in a young person’s life. In what way can this
transition be seamless with the right support at the right time.
2.14  Getting it right for everyone, rightly has a focus on a person-centred, integrated, and
multi-agency approach to support individuals.  Within the overarching commitment to
self-direction this will improve access and embed practice in shared decision-making
and promoting self-determination, encouraging those with lived experience, including
unpaid carers and families to be equal partners in their care and support.  
2.15   The approach within North Lanarkshire also has a focus on preventative and
anticipatory approaches, seeking to ensure that people can remain independent and
living at home, without a need for the involvement of statutory services, for as long as
possible. 
Page 11 of 214

Page 12

2.16 In line with core principles of independence, empowerment, enablement and self-help,
our approach considers as a start point: 
• What the person can do for themselves.
• What might family, neighbours and friends be able to support.
• What role local community resources could play including A Local Information
System for Scotland (ALISS).
• What might technology be able to help with, whether personal technology,
equipment through Assistive Tec team, Making Life Easier, Community Alarm
Service.
• What role might there be for targeted support, such as carer organisations,
condition specific, or age-related support groups or Community Voluntary Sector
(CVS) organisations. This also encompasses our wide-ranging Community
Solutions programme.
• What role might CVS funding available through things like Time to Live, Carer Short
Breaks Bureau, Carer Outcome Grants and so on play. 
2.17  The wider reach of our getting it right for everyone approach requires to have an
intention to ensure that there is an opportunity to get it right for people not currently
known to services. This could have a balanced focus on not “clientising” anyone or
moving people towards ‘service land,’ by drawing them into services unnecessarily, by
promoting preventative and anticipatory planning and approaches with a view to
reducing the likelihood of crisis arising in the first place. The working relationship with
Community Connectors will assist in this area. We believe that such an approach
encompasses: increased awareness about what is important to people – gleaned and
gathered through day-to-day work, as well as focused engagement and participation
activity; increased opportunity for preventative approaches, anticipatory planning and
only where necessary, early intervention; increased connections and communication
with people and communities that we need to work harder to engage with.
2.18  Our Pathfinder recognises the need for a renewed focus on the outcomes that people
identify as being important to them. Many people are reluctant to ask for information,
advice, or support, meaning that very often, their first presentation to services is at a
point when they are already in crisis. Crisis is costly in terms of time, energy, and
resources, but more importantly, costly in terms of the human impact. 
2.19  A getting it right for everyone informed approach seeking to move from “eligibility to
conversation around “what might help?” would assist with all the above and should start
before the point where people need services. As such a getting it right for everyone
informed approach becomes a much wider responsibility than solely that of Health and
Social Care. If this approach was implemented, it would also help inform community
planning, local outcome improvement plans, community agreements and become
embedded in the much wider community and voluntary sector.
2.20  As outlined earlier we require to consider what the prototypes mean in real time. There
has been extensive engagement and communication across the Health and Social
Care regarding the need for the workforce to get back to basics, have meaningful
conversations with people about what is important to them. This requires the principles
to be fully understood and embedded in everyday operational practice therefore being
aligned to Back to Basics and enabling approach across localities with a direct impact
on day-to-day practice.
Page 12 of 214

Page 13

2.21 The challenge is how we implement the getting it right for everyone principles and
practice in a multidisciplinary way and ensure links to locality planning structures and
operational practice. We require an emphasis on people with lived experience having
a strong voice and influence therefore all decision-making being central to the person
including working with our third sector community connectors on the preventative/early
interventions. Community Hubs are ideally placed to progress this development.
Governance   
2.22 Presently the Governance structure has been a Steering Group, Operations Group
being supported by the Pathfinder and Facilitation group reporting to the Strategic
Commissioning Plan Programme Board. With the Back-to-Basics development this has
afforded an opportunity to reconsider existing Governance structures, and this was
presented to Core on Monday 1st July 2024 and the steering, operations and pathfinder
facilitation governance was agreed through the partnership refreshed governance
structure. 
Next Steps
2.23 Getting it right for everyone Principles understood and embedded in practice across
the Health and Social Care partnership. 
2.24 Getting it right for everyone principles aligned with the Back-to-Basics programme i.e.
they become the golden thread to connect all the strands of work and connect people
with the overall vision regardless of organisation or role. 
2.25 The testing of prototypes in a multidisciplinary way in localities through the
demonstrator sites. 
2.26 Leadership commitment to support getting it right for everyone development and
embed principles in everyday practice. 
2.27 Agree a measurement method/outcome for evaluation. 
2.28 Shared and continuous learning to enable any refinement or recourse as required
through the regular back to basics/enabling approach learning sessions. 
3. Measures of success 
3.1 In moving from prototypes to practice, it is essential to determine and agree
performance measures. How do we know we are making a difference and how might
we measure this through performance outcomes. Given prototype development has
reached the stage to be tested operationally, it requires further discussion with people
in their communities and operational staff to further agree the detail. 
3.2 This operational testing will determine how we will know that the getting it right for
everyone overarching principles, and the practice solutions identified through
prototyping will make a difference. Performance measures require to identify whether
the issues people have raised through the co-design process are resolved and that
people experience improved outcomes.   
Page 13 of 214

Page 14

4. Supporting documentation 
4.1 Appendix 1 – The National activity timeline for the NL pathfinder
4.2 Appendix 2 – GIRFE pathfinder governance structure
4.3 Appendix 3 – Engagement and co-design on GIRFE with communities
4.4 Appendix 4 – High level themes identified through initial engagement and co-design.
4.5 Appendix 5A – Example prototype template(s)
4.6 Appendix 5B - Example prototype template 
Diane Fraser
Chief Officer / Head of Service (Adult Social Work Services) 
Page 14 of 214

Page 15

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☒ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 15 of 214

Page 16

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 16 of 214

Page 17

Appendix 1 – The National activity timeline for the NL pathfinder 
Page 17 of 214

Page 18

Appendix 2 – GIRFE pathfinder governance structure 
Page 18 of 214

Page 19

Appendix 3 – Engagement and co-design on GIRFE with communities 
Page 19 of 214

Page 20

Appendix 4 – High level themes identified through initial engagement and co-design (includes engagement on Early and Inclusive family support). 
Page 20 of 214

Page 21

Appendix 5A – Example prototype template(s) 
Page 21 of 214

Page 22

Appendix 5B – Example prototype template 
Page 22 of 214

Page 23

North Lanarkshire Council
Report
Adult Care and Social Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    MD/MW/AMCG Date 12/11/24 
Care Academy 
From  Morag Dendy, Chief Officer (Performance, Planning, and Quality Assurance)  
E-mail DendyM@northlan.gov.uk Telephone 
1. Background 
1.1 The Lanarkshire population is ageing with many older people and a growing number of
younger people living with two or more long terms conditions such as diabetes and
respiratory disease. The burden of illness will continue to increase over the next ten
years as the population ages.  Health and social care services are already experiencing
the impact of meeting the needs of an ageing population, for example, in Home Support
and District Nursing services.  The vulnerability of the ageing group has been
Executive Summary 
The Care Academy has a dual focus on supporting the ambitions of existing staff and
fostering a new generation of health and care professionals.  Building on the work that was
already underway in North Lanarkshire, we have formally consolidated links with South
Lanarkshire Council and NHS Lanarkshire to create a Lanarkshire-wide Care Academy. 
This report is to give Committee and update on progress to date. 
Recommendations
It is recommended that the Adult Care and Social Work Committee. 
(1) Acknowledge the progress with implementation of the Care Academy Pan
Lanarkshire.
(2) Seek further update on progress with the workstreams in 6 months’ time. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (21) Continue to identify and access opportunities to leverage
additional resources to support our ambitions
Programme of Work Brighter Futures  
Item 3
Page 23 of 214

Page 24

demonstrated in the pandemic, which has in turn created specific pressures for the
care professions.
1.2 In an employment context, in 2023, Human Health and Social Work was the largest
employing industry in Lanarkshire, accounting for 45,700 people.  This industry is
forecast to remain in the top employing sectors in the Lanarkshire between 2026 and
2033.
1.3 Future job openings are expected to be concentrated in a small number of industries. 
Within the period 2023 – 2026, figure 1 highlights the forecast total requirement by
industry.  As is clear, Human Health and Social Work has a requirement of 4,400 people
(1,200 based on predicted expansion demand and 3,200 based on replacement
demand).
1.4 Employment growth in this sector is driven by Scotland’s ageing population along with
the aim to protect the provision of frontline services.  It is therefore crucial that the
attractiveness and retention of jobs within this sector is a key focus for future activity.
1.5 Opportunities to respond to workforce challenges exist with recently formed partnership
arrangements which have been agreed between Universities and the Health and Social
Care Partnerships across Lanarkshire.  The key objectives for the partnerships are to
formalise the working relationship between the council’s and the universities such that
over an agreed period, there is a process in place for identifying, defining, and
progressing potential opportunities for engagement through collaboration.  To achieve
this, the scope of the partnership agreements covers interactions such as research
collaborations, honorary appointments, Graduate Apprenticeships, student
placements, jointly funded posts, secondments of staff, student recruitment, student
projects, education, continuing professional development and policy and practice. 
2. Report 
2.1 The overall vision for the Care Academy is to: 
2.1.1 Develop a robust, sustained, vibrant Care Academy attracting and developing a diverse
workforce for health and care services in Lanarkshire and promoting the sector as a
rewarding choice for careers. 
2.2 The pan-Lan membership has been reviewed with a refreshed Terms of Reference
outlining the responsibilities of the Board, and areas of activity which are (and are not)
within its remit. Members of the Steering Group have been selected based on their
subject matter experience and expertise. 
2.3 Four workstreams have been established with the remit of each clear covered in the
Terms of Reference. Related task and finish groups will be enabled by workstreams as
appropriate. Each workstream has authority (under the strategic direction of the
Steering Group) to determine how workstream items will be resourced, progressed,
monitored, and delivered. The workstreams are: 
2.4 W1 – Attraction, recruitment, retention and wellbeing 
Developing recruitment strategies to attract prospective candidates to the sector. 
Engaging and focusing on employee safety, well-being motivation to enhance
employee retention.   
2.5  W2 – Pathways to care for young people 
Page 24 of 214

Page 25

Strengthening the reach and impact into the health and social care sector through a
vocational education model, aiming to grow a future talent pipeline.   
2.6 W3 – Adult pathways to care 
Improving prospects for working-age adults entering the health and social care sector,
addressing poverty, and inequality, attracting passive candidates, and facilitating
career change opportunities. 
2.7 W4 – Funding and procurement 
Continually review and assess current and upcoming funding streams and identify
potential gaps and opportunities.  Explore the potential of community benefits
opportunities.  It was agreed at the most recent Board meeting to put this workstream
on hold until the others are all well established. 
2.8 The Care Academy is a collaborative initiative between NHS Lanarkshire, North
Lanarkshire Council and South Lanarkshire Council. It reports through both North and
South Lanarkshire Council’s committee structure. The Academy is authorised to work
with partners such as local councils, education departments, colleges, universities, the
independent sector and third-sector organisations to attract and recruit staff to the
health and social care workforce. 
3. Measures of success 
3.1 Each of the workstreams are now established, with specific actions within each being
developed by the workstreams themselves.  As work progresses the Workstream Lead
will be responsible for ensuring the deliverables are met with any exceptions and delays
reported to the Steering Group. 
3.2 A further update on progress on each of the workstreams will be brought back to IJB in
6 months.  Progress and updates are also provided through: 
• Brighter Futures Programme Board - North Lanarkshire
• Social Work Resource and Finance and Corporate Resources (Personnel
Services) – South Lanarkshire
• Core management team of both HSCP’s - NHSL 
4. Supporting documentation 
N/A 
Morag Dendy
Chief Officer (Performance, Planning and Quality Assurance) 
Page 25 of 214

Page 26

5.amand Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
All current and future recruitment meets the terms of Public Sector Equality Duty
and Fairer Scotland Duty. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
All current and future recruitment activity will be within the policy parameters. 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Page 26 of 214

Page 27

Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Campaign to promote the sector and the work of the Care Academy will be
developed through Workstream 1. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Page 27 of 214

Page 28

Yes ☐ No ☐ 
Page 28 of 214

Page 29

North Lanarkshire Council
Report
Adult Care and Social Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    MD/MW/AMCG Date 12/11/24 
Review of Commissioned Registered Social Landlord Provision 
From  Morag Dendy, Chief Officer (Performance, Planning and Quality Control)  
E-mail DendyM@northlan.gov.uk Telephone 
Executive Summary 
Following approval in March 2020 to remodel the current RSL services to become
Retirement Housing in line with the in-house North Lanarkshire Council model, a review of
Registered Social Landlord Services (RSL) commenced. Unfortunately, this review was
then delayed due to the impact of the pandemic.   
The review recommenced in June 2023, and since then we have continued to work in
partnership with the providers to reach an outcome that best serves the population of older
people across North Lanarkshire. 
This report is to give Committee an update on the review. 
Recommendations
It is recommended that the Adult Care and Social Work Committee. 
(1) Recognises the progress of this review, which when completed will further embed
the principles of Self-Directed Support – Social Care (Self Directed Support)
(Scotland) Act 2013.
(2) Acknowledge the change in provision delivered by both Link Housing Association
and Blackwood and note a review of this provision is no longer required.
(3) Acknowledge concerns raised by Trust and their representatives and note
agreement has been reached following a positive meeting between North
Lanarkshire Council and Trust Housing Representatives.
(4) Acknowledge the approval by Aspire management committee to progress to a
Retirement Housing model at, Law View Housing development.
(5) Note the delay in progressing the review with Hanover Scotland due to fire safety
concerns and following an independent fire audit, endorse the recommencement of
that review.
(6) Agree a notice period to 31 March 2025 to enable transition planning with providers
and individual tenants. 
Item 4
Page 29 of 214

Page 30

1. Background 
1.1 The contracts with Registered Social Landlords (RSLs) expired in 2016/17, prompting
a review of the services being provided. The review has been significantly delayed due
to the impact of the Covid-19 pandemic.
1.2 The purpose of review was to ensure that people had the freedom to choose who
provides the care and support they receive. We recognise it is vital that any support
tenants receive are focused on their needs and are unique to them.
1.3 The decision to remodel Registered Social Landlord Provision (RSLs) was approved
within the March 2020 IJB financial plan, which received cross party support. The plan
detailed that the current RSL services would transition to become Retirement Housing
in line with the council’s in-house model. It was noted that this change would result in
future support costs being absorbed by housing benefit.
1.4 This current review commenced in June 2023. Following discussions with providers
and the collation of data and impact assessments outlining the needs of tenants, North
Lanarkshire Council informed all providers within the scope of the review of the initial
proposal to withdraw all housing support funding. 
1.5 As the review has progressed, we have provided updates via Elected Member
briefings, FAQ documents and engagement sessions with Providers, residents and
stakeholders.  
2. Report 
2.1 Registered Social Landlords provide a range of different support arrangements across
North Lanarkshire.  Prior to 1st April 2024 these RSLs, who ran 12 complexes, were: -
• Trust Housing Association
• Hanover Housing Association
• Link Housing Association
• Aspire
• Blackwood
2.2 The services the RSLs provide primarily take the form of sheltered, very sheltered, and
supported housing. North Lanarkshire Council currently provide funding that is used for
on-site staff to provide a housing support service to tenants in each of the complexes.  
2.3 RSL providers have been aware of the outstanding review of these services since
approximately 2016/17. They have engaged with some other Local Authorities who
carried out the review of this legacy funding stream, some as far back as 2016/17.
Other Local Authorities have either discontinued funding or redesigned to models which
include retirement housing, housing with care, amenity housing or a continuation of
sheltered/very sheltered housing. 
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement
(12) Ensure our residents are able to achieve, maintain, and
recover their independence through appropriate supports at home
and in their communities
Programme of Work Resilient People
Page 30 of 214

Page 31

2.4 Local Authorities who have not yet carried out reviews of RSL provision have indicated
plans to do so. Some authorities have noted that providers have decided to redesign
of their own initiative to make them suitable to the current housing and care needs of a
changing population whilst remaining financially sustainable. 
2.5 Equals Advocacy were commissioned to ensure an independent voice for tenants.
They attended all engagement sessions and met separately with individuals and
groups at later dates where this support was requested.
2.6 Tenant care and support needs are addressed by social work through individual
packages of tailored care. A mix of our Homecare service and independent providers
are delivering these bespoke packages in line with the ethos of Self-Directed Support
(SDS). 
2.7 RSLs have been using North Lanarkshire Council funding to pay for various levels of
on-site staffing. However, over time the roles and responsibilities of staff within
developments appears to have become unclear with possible unmet tenant needs and
duplication of provision, suggesting streamlining of care and support would achieve
better individual choice and outcomes for tenants.
2.8 North Lanarkshire Council funds a wealth of community resources, however tenant
feedback through the engagement sessions suggested these were not being accessed
by tenants within sheltered housing/very sheltered housing, with reliance for social
stimulation being directed to the in-house warden service. This limits choice and
participation in a wide range of unique and diverse activities to enhance overall sense
of purpose, identity and holistic well-being. 
2.9 On the 1 April 2024, Link Housing Association decided to implement their new
Retirement Housing model across their three North Lanarkshire Sheltered Housing
services. This decision was despite not having concluded the review, rather it was
based on Link’s experience of the outcomes in similar reviews that have been carried
out by a number of Scottish Local Authorities. This model meant the de-registering of
the services with the Care Inspectorate as housing support was no longer a feature of
the services. Furthermore, it meant a reduction from 35 hours weekly staffing to 25
hours weekly staffing in each service.
2.10 As of 16 July 2024, Blackwood implemented its new Retirement Housing with meals
model within Buchanan House, which was previously a Very Sheltered Housing
service. Buchanan House is no longer registered with the Care Inspectorate as housing
support is no longer delivered. 53 hours on-site staffing weekly is now included within
the service model as opposed to 70 hours weekly previously. To enable this creative
and dynamic model Blackwood carried out a consultation and restructure with their
employees to reflect the more practical nature of the new model. 
2.11 Both Link and Blackwood now no longer receive legacy housing support funding from
North Lanarkshire Council.  It is important to note that commissioned Advocacy
services have reported positive outcomes since the changes have been made, which
mirrors feedback received from North Lanarkshire Council Housing colleagues as a
result of the redesign of the Council’s Sheltered Housing to Retirement Housing. 
Hanover Scotland
2.12 Throughout the review period Hanover Scotland has always advised that without staff
on-site, including night cover at McAlpine Court, they would not be safe to operate due
to the structure of the building and the associated fire risks. Funding which is the subject
Page 31 of 214

Page 32

of this review currently pays for the costs of one on-site housing support worker seven
days per week, twenty-four hours per day. 
2.13 Sleepover funding was agreed on a temporary basis approximately two years ago,
pending this review. Hanover Scotland approached North Lanarkshire Council at this
time to request funding for night cover due to the change for a standard night payment
to an hourly rate for sleepover workers. Prior to this change, tenants had funded the
sleepover as they benefited from the sense of security this brought them.
2.14 As part of the review of McAlpine Court, an independent assessment was
commissioned by North Lanarkshire Council to review the fire evacuation measures
deployed by Hanover Scotland and several recommendations have been made to
safeguard tenants residing there.  The aims of the recommendations would be to either: 
o Upgrade fire protection measures to allow a stay put policy
o Deploy sufficient staffing to enable a simultaneous evacuation.
o Assess the needs of tenants living within McAlpine Court to determine whether the
accommodation is suitable due to dependency levels.
2.15 Hanover Scotland have always communicated that without on-site staffing a number of
residents would need to move to a care home environment. As there is currently one
member of staff on shift it is felt that reviews of tenants open to social work must take
place to ensure that their needs are being fully met at this time.
2.16 The review was paused on 18 July 2024 due to safety concerns relating to the
management of fire within McAlpine Court. We continue to discuss with Hanover the
findings of our independent fire consultant in relation to their current evacuation
strategy and risks posed by this. A range of options have been suggested for Hanover
to consider in their role as landlord and responsible persons for having suitable and
sufficient fire measures in place. It is our intention to recommence the review in the
coming weeks. 
Aspire 
2.17 Aspire currently delivers a housing support service funded by North Lanarkshire
Council to tenants residing in Law View Housing Development. The landlords are
Garrion and Forgewood Housing Associations. A new model of Retirement Housing
which provides housing management services has been approved by the respective
management committees and we have been advised that engagement with tenants will
commence imminently. 
2.18 The Housing Associations continue to liaise with North Lanarkshire Council about
maximisation of housing benefit/service charges. North Lanarkshire Council will
continue to provide support ensure a seamless transition to the new service model. It
is anticipated that the housing support service will end as of 31 March 2025.
Trust Housing Association 
2.19 Following the proposal to withdraw all housing support funding, Trust advised it would
redesign their six services to a range of retirement and amenity housing. Trust identified
the models for each service. Arrangements included very sheltered complexes moving
to amenity housing.
2.20 Trust advised concerns raised related specifically to 3 very sheltered complexes,
proposing these complexes changed to a Housing with Care model on a revised block
Page 32 of 214

Page 33

grant funding arrangement. Trust confirmed the 3 remaining sheltered complexes could
easily change to a Retirement Housing model.  Trust advised that they deliver a
Housing with Care model in several other local authority areas and were keen to
explore this as an option in North Lanarkshire.
2.21 To fully meet the principles of self-directed support legislation, our approach is to
ensure that housing and care/support needs are separate and unique to everyone. 
2.22 This is instead of a block of support being available as part of the overall
accommodation and accessible to the group of tenants. This may not be the right
support for all tenants and prevents them being involved in choosing the care provider
that’s right for each person’s individual needs and situation.
2.23 At the centre of all considerations regarding the housing with care model was the vision
to embrace the principles of choice and control for all current or potential future tenants
living at these services.
2.24 Ongoing engagement with Trust has been maintained and during a meeting on 19
August, Trust and the council reached agreement.  Trust will transition its six complexes
to a combination of Retirement Housing and Retirement Housing with meals. Trust will
also tender to be included as a care and support provider on the North Lanarkshire Self
Directed Support Framework, which will open for entry point 5 later this year. This
approach means that tenants will have the choice to choose Trust to provide their care
and support. 
2.25 We will work with Trust to transition from the current arrangements to the new. This
move will align the end of existing arrangements with the implementation of Retirement
Housing/Retirement Housing with meals. New providers will be operational and able to
deliver packages of care from 1 April 2025, which will mean the current arrangements
will end on 31 March 2025. 
3. Measures of success 
3.1 The review of Registered Social Landlord provision will be completed, with all new
arrangements in place by 01 April 2025. 
3.2 We will continue to engage with Trust as we transfer to the new arrangements.
3.3 We will continue to engage with Hanover Scotland re implementing the
recommendations made following the independent review of the fire evacuation
strategy.
3.4 We will recommence the review of Hanover Scotland. 
3.5 Completion of this review will achieve the intentions as set out in the March 2020 IJB
financial plan. 
4. Supporting documentation 
4.1 Appendix 1 JB Financial Plan 2020/2021Document.ashx (cmis.uk.com) 
Morag Dendy
Chief Officer (Performance, Planning, and Quality Assurance) 
Page 33 of 214

Page 34

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
An EQIA has been completed and from the data collated and direct engagement with
a range of stakeholder, it was evident that where individual tenants were assessed
as requiring care and support, they received this from a provider out with the
Registered Social Landlord with individual budgets arranged by social work. Tenants
have access to emergency support by utilising a combination of the RSL Provider’s
internal alarm service and NLC community alarm service where this has been
assessed as being required. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
Link - 24/25 Budget £46,651.  Ceased 31/3/24. 
Blackwood - 24/25 Budget £27,208.  Ceased 16/7/24.
Aspire - 24/25 Budget £22,607. 
Hanover - 24/25 Budget £133,618.  This includes a sleepover which has been
funded for approximately two years and was agreed on an interim basis pending
the review of Registered Social landlords. 
Trust operates six services across North Lanarkshire - 24/25 Budget £327,442.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
Page 34 of 214

Page 35

5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Engagement sessions took place, written information was provided, and advocacy
were commissioned to ensure representation as a group and individually. 
Advocacy and carers were involved.
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
Service risk register – Medium. Owner – Chief Officer (Adult Social Work Services)
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Page 35 of 214

Page 36

Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 36 of 214

Page 37

North Lanarkshire Council
Report
Adult Care and Social Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    AG/JC/AMCG Date 12/11/24 
Cost of Living Helpline 
From  Alison Gordon Chief Social Work Officer (Education, Families, Justice &
Integrated Practice) 
E-mail GordonAl@northlan.gov.uk Telephone 07583111137 
Executive Summary 
This report provides details of the income maximisation work carried out by the Cost-of-
Living Helpline (Tackling Poverty Team) and Council Services during 2023/24 which
generated £47,935,822 in additional benefit income for the residents of North Lanarkshire
an increase of 35.1% from the previous year.   
Over this reporting period the continuing legacy of the pandemic and most significantly the
Cost-of-Living Crisis have continued to impact disproportionately on our most
disadvantaged residents and communities, bringing the importance of income
maximisation and wider work to tackle poverty into sharp focus, with the impact of low paid
and insecure work a particular challenge.   
Since establishing the ‘Cost of Living Helpline’ in early 2023, supported by additional
funding provided through the Joint Integration Board, there had been an increase of 41.2%
in the number of benefit checks completed for residents; rising from 18.521 benefit checks
completed in 2022/23 to 26,158 benefit checks completed in 2023/24.   
More broadly local approaches to tackling poverty and reducing inequality in North
Lanarkshire, continue to be driven by the ‘Towards a Fairer ‘North Lanarkshire Tackling
Poverty Strategy with activity focused on the key drivers of poverty.   
Recommendations
It is recommended that the Adult Care and Social Work Committee. 
(1) Note the contents of this report.
(2) Endorse the report and note the impact of the funding of the Cost-of-Living helpline for
residents.
(3) Note that this report has been presented to IJB to approve the request to extend the
use of the already earmarked funds (£600,000, from April 2023 to March 2025) to
support the enhanced service to June 2025. 
Item 5
Page 37 of 214

Page 38

1. Background 
1.1 Despite recent positive news on wage growth, the legacy of the global pandemic,
ongoing cost-of-living crisis and high levels of deprivation, continue to acutely affect
inequality and poverty in North Lanarkshire, impacting the most vulnerable in North
Lanarkshire’s communities.  Against this landscape the refreshed ‘Towards a Fairer
North Lanarkshire’ Tackling - Poverty Strategy for 2023-2026, sets out our ambition to
continue to tackle poverty and child poverty, building on our previous actions and some
of the positive foundations achieved through the previous strategy for 2020-2023. The
new and refreshed Tackling Poverty Strategy encompasses an integrated multi service
approach within the Council, alongside an increased focus on working externally with
all community planning partners, communities, and people with lived experience of
poverty.   
1.2 In addition, the Strategy encompasses the statutory requirement to prepare and publish
a Local Child Poverty Action Report for North Lanarkshire for 2022/23, reflects the
ambition of the national Tackling Child Poverty Delivery Plan 2022-26 Best Start Bright
Futures published by the Scottish Government in April 2022 as the second of 3 delivery
plans required by the Child Poverty (Scotland) Act 2017.   
1.3 The Tackling Poverty Team, Health and Social Work Services and Housing Solutions
provides service users and members of the public with advice and assistance on a wide
variety of benefit-related issues.  A full benefits check is offered to all new service
users.  Income maximisation also plays a vital role in longer term Social Work services
such as Community Care, Children and Families, Kinship Care, Justice Services,
Mental Health, and Addictions. 
1.4 A key role of the Tackling Poverty Team is to support the income maximisation service
through the First Point of Contact Team to residents, Support Services for fieldwork
staff, supporting specialist Social Work Services, Education Services and Housing
Services and the Resolution Team representing clients at tribunals and hearings.
Successful welfare rights intervention, where individuals are awarded extra benefit,
frequently means that, as a result of increased income, they are better able to manage
their own affairs and may not require further health and social work services. 
1.5 The cost-of-living crisis continues to exacerbate existing health inequalities through its
wider impacts on physical and mental health and well-being and in line with its strong
commitment to prevention, the Health and Social Care Partnership have been keen to
explore options to enhance the early help and advice available to individuals and
families impacted by the current crisis. 
1.6 On 30th November 2022, the Integration Joint Board approved funding of £300,000 per
year 2023/24 and 2024/2025 to allow the Tackling Poverty Team to recruit additional
staff and for the Council to establish a ‘Cost of Living Helpline’. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement
(11) Increase economic opportunities for adults by understanding,
identifying, and addressing the causes of poverty and deprivation
and barriers to financial inclusion
Programme of Work Resilient People
Page 38 of 214

Page 39

2. Report 
2.1 Although inflation has dropped from over 11% down to just above 2% in the last year,
the cost-of-living crisis continues, to have unprecedented pressures on people already
in poverty in North Lanarkshire. With thousands of people being forced into poverty,
having to make tough decisions about when and what they eat, keep their homes, what
they can do in life, and when they can afford to heat their home. 
1.2 The recovery from the pandemic, the cost-of-living crisis and a number of issues
causing or exacerbating the effects of poverty on people in North Lanarkshire. Whilst
Inflation has reduced in 2024, issues such as mortgage interest rates increases, price
increases on energy, fuel and food increases, real term cuts in wages and welfare
reforms continue to acutely affect inequality and poverty, together with other economic
factors, impacts the most vulnerable in North Lanarkshire’s communities. 
1.3 The supports coming from both the Scottish and UK governments, have been reduced
significantly 2024/2025 and the next few years will be extremely challenging for a
significant number of households. 
1.4 The Tackling Poverty Team submitted its Activity Report for 2023/24 to the Wellbeing
and Tackling Poverty Committee on 16th August 2024, which is remitted to the IJB
Board for information.   
1.5 This report outlines the activity of the Cost-of-Living Helpline and the impact of the wider
use of referral pathways with Council Services, IJB Services and NHS Lanarkshire. 
1.6 Since establishing the ‘Cost of Living Helpline’ in 2023, with funding provided by the
Joint Integration Board, there had been an increase of 41.2% in the number of benefit
checks completed for residents; rising from 18.521 benefit checks completed in
2022/23 to 26,158 benefit checks completed in 2023/24. 
1.7 The additional benefit income generated by the Tackling Poverty Team and other
council services increased by 35.1%, with a total of £47,935,822 of additional benefit
income generated via claims, mandatory reconsiderations and appeals for benefits. 
1.8 There has been a considerable increase in demand for the Tackling Poverty Team
welfare rights service, with the average number of referrals per month received by the
team rising from 945 in 2022/23 to 1180 referrals per month in 2023/24.  A 25%
increase. 
Maximising Income of Health and Social Work Service Users –   
1.9 Social Workers can refer people and families to the Tackling Poverty Team to ensure
that income is fully maximised, and that people have access to budgeting/debt advice
as well as financial education.   
1.10 The Tackling Poverty Team have a dedicated “support services team” for referrals from
social work and other council services which may be complex and require more than
initial advice offered by First Point of Contact.  Referrals for Kinship Carers and those
people entering residential care are sent directly to Support Services. 
1.11 Considerable work has been done by the Tackling Poverty Team to promote this within
social work localities and referrals have almost doubled in numbers to the team, with
Page 39 of 214

Page 40

4888 benefit checks being carried out via referrals received from social workers the
previous year to 9639 benefit checks completed in 2023/24. 
1.12 In total £5,062,066 of additional benefit income was generated for people receiving
social work services, £743,199 of this is attributed to kinship care families, £895,191
generated for people accessing Justice and children and families’ services, with the
remaining £3,423,676 for those accessing adult social work and social care services. 
MacMillan Advice Service 
1.13 The Tackling Poverty Team host the MacMillan Advice Service which offers income
maximisation to those people and their families who are affected by a cancer
diagnosis. 
1.14 The Tackling Poverty Team received 700 referrals from MacMillan in 2023/24, the
same number of referrals as the previous year. 52% of those people referred to the
service had a terminal illness diagnosis. 
1.15 The work carried out by the Tackling Poverty Team generated £3,542,782 in
additional benefit income for patients and their families. 
Food Poverty 
1.16 The food poverty referral gateway aim is to mitigate the need for foodbanks or reduce
the use of foodbanks by ensuring access to advice services, claims for the Scottish
Welfare Fund crisis grants and provide a cash first approach. 
1.17 North Lanarkshire Council has led the way since 2014 in promoting a Cash First
approach to tackling food poverty, by ensuring that people do not only have access to
crisis grants for the immediate need, but also access to information and advice services
to ensure sustainable solutions to food crisis. 
1.18 Referrals to the Tackling Poverty Team for people who are presenting in food crisis
have generated £1,211,758 in additional benefit income, with people receiving
assistance to claim benefits such as adult disability payment, council tax reduction,
Scottish child payment, pension credits and others. 
1.19 Additional temporary funding was received via a Scottish Government funding bid,
which was lodged by the Tackling Poverty Team in conjunction with the Food Poverty
Action Group.  The Tackling Poverty Team are able to provide an interim payment for
service users who have been assisted with a crisis grant, the interim payment is
provided for the first 24/48 hours until the crisis grant decision has been made.  
1.20 The Scottish Government funding will also allow for work to be done with emergency
food providers, to allow for more uniform reporting, therefore allowing us to better
measure the impact this approach is having on demand for emergency food. 
Health Services 
1.21 Detail is provided below of income maximisation and impacts of partnership working in
with Health Services with respect to Tackling Poverty. 
Page 40 of 214

Page 41

1.22 General health staff referrals to the team have increased by 50% from 2022/23 with
591 referrals received in 2023/24.  The additional benefit income generated via these
referrals has been £872,366. 
1.23 Referrals from Health Visitors and District Nurses are relatively low in comparison to
other areas of health. The total income generated from the 119 2023/24 referrals is
£144,251. 
1.24 Discussions have already taken place between Health Improvement Leads and the
Tackling Poverty Team to plan sessions to improve the work in this area. 
1.25 NHS Lanarkshire employ Community Link Workers who will take referrals from GPs in
respect of social prescribing.  Temporary funding has been provided to both the
Tackling Poverty Team and external partners to provide income maximisation and
money advice services. 
1.26 Referrals from the GP Link Workers have also fallen with 482 welfare rights referrals
received in 2022/23 and 333 in 23/24. The 333 welfare rights referrals to the tackling
poverty team generated £252,504 in additional benefit income. (debt advice referrals
146 2022/23 and 133 in 2023/24) 
Improvement Service Project (Wealth & Health Project)
1.27 Temporary funding has been provided by the Improvement Service to install a welfare
rights officer within 4 GP practices in North Lanarkshire (Bellshill, Coatbridge x2,
Wishaw). 
1.28 This project has proven to be very successful, with a 70% increase in referrals from the
previous year to 608 this year.  The total additional income generated for patients from
these four practices is £1,738,154. 
Overview NHS Lanarkshire Services – Tackling Poverty Team
1.29 The Partnership between NHS Lanarkshire Services and the Tackling Poverty Team
has resulted in over 2350 patients receiving a benefit check in 2023/24, with £6,550,056
in additional benefit income being generated, with14% of the income generated within
North Lanarkshire was generated from Health Referrals  
1.30 Appendix 1 provides a more detailed presentation of the income generated for
2023/24 for Health and Social Care Services
Conclusion and Analysis
1.31 Extending the capacity of the Tackling Poverty Team has allowed the team, to support
the wider capacity issues for the Third Sector, Health and Social Care Services,
Education and Families Services, Housing Solutions, and other Community Planning
Partners, by providing advice, support and referral pathways for these services, and
the community drop-in centres, North Lanarkshire Council’s -Work Local Hubs
(available to all Council, IJB and NHS Lanarkshire staff) whilst ensuring direct access
for communities through the helpline.
1.32 As recognised above it is inevitable that the pressures and reality of the Cost-of-Living
Crisis means many people will also experience negative impacts on their health and
wellbeing, the Tackling Poverty Team have received additional training in key areas,
e.g. mental health and wellbeing to support capacity to recognise and respond to wider
Page 41 of 214

Page 42

needs through the appropriate signposting and referrals. The Tackling Poverty Team
and NHS Lanarkshire already have a well-developed approach for financial wellbeing,
signposting to other services and referrals pathways, this builds on the learning from
the NL Covid (Community Hubs) Helpline.
1.33 The Tackling Poverty Team monitors and records activity of the helpline, in number of
people assisted, reason for referral, income generated, advice given, outcomes,
number of people/referrals signposted to other services/agencies. The Tackling
Poverty Team reports on the wider use of the referral pathways with, Council Services,
IJB Services and NHS Lanarkshire. 
1.34 There has been a fall in activity and referrals from the Community Link Workers and
low numbers from Health Visitors and District Nurses in 2023/2024. The Tackling
Poverty Team and NHS Lanarkshire staff are reviewing these referral pathways to look
at what steps are required to encourage and increase the referrals from these health
services during 2024/25.   
1.35 To date, it is predicted that the total spends by March 2025 against the funds committed
by the IJB to enhance team capacity and support the helpline will be £455,000.  The
underspend is due to recruitment challenges, only recruiting 2 Clerical Assistants,
rather than the 4 included in the original staffing levels proposed and also due to staff
moving on to permanent posts. 
1.36 A request that this agreement is carry over the remaining funding committed by the IJB
to allow the contracts of staff employed to be extended to support the Cost-of-Living
Helpline and maintain enhanced capacity until 30th June 2025, has been submitted to
the IJB Performance and Finance Board. This will allow the service to review any
adjustments which require to be made to the service to align with decisions made on
future core and supplementary funding streams. 
1.37 It would be the intention to report back to the IJB Performance and Finance Sub
Committee under the same cycle of reporting back to the Council’s Wellbeing and
Tackling Poverty Committee, in 2025.  
3. Measures of success
3.1  Ensuring and improving the standardised service to all residents and providing a
sustainable, responsive, and effective means of quality advice and support to our
communities across North Lanarkshire.
4. Supporting documentation
4.1 Appendix 1 Tackling Poverty Team – Cost of Living Helpline June 2024
4.2 Appendix 2 TOWARDS A FAIRER NORTH LANARKSHIRE
4.3 Appendix 3  North Lanarkshire Local Child Poverty Action Report 2022-2023
Alison Gordon
Chief Social Work Officer (Education, Families, Justice and Integrated Practice)
Page 42 of 214

Page 43

5. Impacts
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact?
Tackling Poverty is fully aligned with the requirements of the Fairer Scotland Duty,
its purpose being to reduce the inequalities caused by socio economic
disadvantage.
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Yes ☐ No ☒
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
If Yes, have all relevant financial impacts been discussed and agreed with
Finance?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact
Does the report / project / practice contain or involve the processing of personal
data? 
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk
Yes ☐ No ☐
Page 43 of 214

Page 44

5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)?
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact?
The Tackling Poverty Officers Action Group Sub Group developed a
Communications Plan.
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Tackling Poverty has been identified as a Corporate Risk, with the Chief Social
Work Officer as the risk lead. Towards a Fairer North Lanarkshire - Tackling
Poverty Strategy sets out a planned approach which seeks to eliminate poverty or
make very significant reductions in the level of poverty resulting in benefit to the
residents and including improvement in the overall level of health and wellbeing of
communities.
5.10 Armed Forces Covenant Duty
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)?
Yes ☐ No ☒
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these?
Page 44 of 214

Page 45

Yes ☒ No ☐
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC).
In North Lanarkshire we recognise that tackling poverty and inequality does not fall
to one Service, or one Sector, we must therefore work together to use our
resources effectively and efficiently to ensure that all our communities have access
to opportunities that will lead to better outcomes for people in terms of employment,
wellbeing and inclusive growth.
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out?
Yes ☐ No ☒
Page 45 of 214

Page 46

Tackling Poverty Team –
(Cost of Living Helpline)
June 2024 Page 46 of 214

Page 47

Increase Income Via Social Security – Council Services Maximise Income For Residents
Brief Description All residents are offered income maximisation and we continue to
promote the “no wrong door” approach
Baseline From Action Plan 2022/23 - 18,521 benefit checks completed generating £35,480,020 in
additional income
Update
There has been a 41.2% increase in the number of benefit checks completed, from the
previous year, with a total of 26,158 benefit checks carried out for the residents of North
Lanarkshire.
The total income generated for residents via income form social security benefits is
£47,935,822 an increase of 35.1%
Issues/ Points to Note The Tackling Poverty Team resources have been increased via external temporary funding
from NHS Lanarkshire, Improvement Service and the UK Shared Prosperity (employability),
and as such have been able to meet the demand (albeit with waiting times increasing). 
Task is now
working as per
the Strategy
Page 47 of 214

Page 48

Increase Income Via Social Security – Council Services Maximise Income For Residents
Brief Description All residents are offered income maximisation and we continue to
promote the “no wrong door” approach
Issues/ Points to Note
There has been a notable increase in the demand for welfare rights services, with the
average number of referrals per month received by the team rising from 945 to 1180 (a
25%increase).
Due to the level of demand on the Service, the normal 3-5 working day wait for services has
at times had to increase to 5-7 and at peak times 7-10 working days, this is done in
conjunction with the Business Manager.
The managed migration for people to move from legacy benefits to Universal Credit is
extremely complex and it is vitally important that our staff are on a development path
around this.
29% of our staff are on temporary contracts which are due to expire in March 25, as demand
increases this remains a risk for the team
Task is now
working as per
the Strategy
792
933 885 773
1066
926 977 972
717
1031 1051
1227
1005
1153 1151 1092
1242 1165
1305 1294
902
1377 1295 1174
APRIL MAY JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH
First Point of Contact Referrals
referrals 2022/23 referrals 2023/24
Page 48 of 214

Page 49

Increase Income Via Social Security Benefits – Work With Social Work Service
Brief Description Social work staff refer people to the Tackling Poverty Team who will carry
out all income maximisation work
Baseline From Action Plan 2022/23 4888 benefit checks
Update
Considerable work has been done by the Support Services Team within
Tackling Poverty to promote referrals for income maximisation.
9639 benefit checks have been carried out via social work referrals,
generating £5,062,066 additional income.
Issues / Points to Note £743,199 was generated via Kinship Care Benefit Checks – this is an area
of good practice that we will highlight in the Local Child Poverty Action
Report
£ 709,988 was generated via referrals from Justice Services
There has been considerable inroads in the work with Social Work staff,
we need to build on this ensuring that Poverty Awareness Sessions are
carried out for all social work staff.
Task is now
working as per
the Strategy
Page 49 of 214

Page 50

Increase Income Via Social Security Benefits – Work With Social Work Service
£0.00
£100,000.00
£200,000.00
£300,000.00
£400,000.00
£500,000.00
£600,000.00
£700,000.00
£800,000.00
£900,000.00
£1,000,000.00
£1,100,000.00
£1,200,000.00
£1,300,000.00
£1,400,000.00
£1,500,000.00
£1,600,000.00
£1,700,000.00
£1,800,000.00
£1,900,000.00
£2,000,000.00
social work income generated by referring team
Page 50 of 214

Page 51

Income Via Social Security Benefits – MacMillan Advice Service
Task continues to have
ongoing work
Brief Description Maximise the income of cancer patients, their families and carers
Baseline From Action Plan 700 referrals received in 2022/23
Update In 2023/24 the Tackling Poverty Team received 700 referrals.  Of those
referrals, 52% were for people who were terminally ill.
The total income generated via MacMillan referrals for patients and their
families was £3,542,782.
Issues / Points to Note The MacMillan Service is embedded in the work of the Tackling Poverty
Team, there is temporary funding for 2 posts, however, the referrals are
dealt with by the full team
Task is now
working as per
the Strategy
Page 51 of 214

Page 52

Increase Income Via Social Security – Food Poverty (Actions 4&5)
Brief Description Mitigate the need for foodbank use by ensuring access to advice services and
claims to crisis Grants. 
Group to consider uniform recording to access all emergency food providers
Baseline From Action Plan Due to the lack of uniform recording there is no baseline
Update Scottish Government funded project to provide both interim payments and a
Co-ordinator to work with foodbanks looking at uniformity.  The funding is
also to consider all emergency payments across the council and how these
are used.
Using the Cash First approach which is about providing sustainable solutions
for people, the Team have generated income via social security benefits for
people who have presented in food crisis etc, the total income generated is
£1,211,758
The co-ordinator in conjunction with Scottish Welfare Fund have produced a
uniform referral fund, work will be done with the emergency food providers
to implement this.
Issues / Points to Note A number of foodbanks have now resorted to no referral forms, operating
drop in sessions, the Co-ordinator will be exploring this with these
organisations. Task is now working
as per the Strategy
Page 52 of 214

Page 53

Increase Income Via Social Security – Food Poverty (Actions 4&5)
Page 53 of 214

Page 54

Income via Social Security – Health Staff
Brief Description Health staff will ensure money issues are addressed and referrals are
made to the tackling poverty team
Baseline From Action Plan 394 referrals received in 2022/23
Update There has been a 50% increase in the number of general health referrals
to the team, with 591 referrals being received in 23/24 generating 236 
claims for benefits resulting in additional benefit increases of £872,366
Issues / Points to Note The Tackling Poverty Team created a “Health Advice Co-Ordinator” post,
the introduction of this post has provided improved recording with
procedures put in place to ensure referrals are not only recorded
accurately but outcomes are pursued.
Task is now working
as per the Strategy
Page 54 of 214

Page 55

Income via Social Security – Improvement Service Project (GP Services)
Brief Description Health staff will ensure money issues are addressed and referrals are
made to the tackling poverty team
Baseline From Action Plan 357 referrals 22/23
Update The Wealth and Health Project began with three GP practices, one in
Airdrie, Bellshill and Coatbridge, a fourth practice in Wishaw came on
board at the end of 2023.  The project has seen a 70% increase in
referrals from last year, with the welfare rights officer receiving 608 GP
referrals in 23/24.  The total additional income generated for patients
from these four practices is £1,738,154
Issues / Points to Note The funding for the Wealth and Health Project is temporary with the
council receiving reduced funding for 2024/25. The Improvement Service
were able to provide 50% funding for the project due to its success,
however, the council have been asked to cover the costs of the additional
half post.
Task is now working
as per the Strategy
Page 55 of 214

Page 56

Income via Social Security –Relaunch Health Visitor & District Nurse Referral
Pathway
Brief Description Poverty Awareness Training and pathway training to take place
Baseline From Action Plan No baseline available
Update 119 referrals were received via health visitors and district nurses in
2023/24, generating 55 claims totalling an additional benefit income of
£144,251.
Issues / Points to Note Discussions have taken place between the tackling poverty team and
health improvement leads to plan Poverty Awareness Sessions across
both disciplines.  It is recognised that the sessions will be tailored to the
different disciplines and patient group of health visitors and district
nurses.  Below is a table showing the localities referrals are generated
from.
Task continues to
have ongoing work
Locality Airdrie Bellshill Coatbridge Cumbernauld Motherwell Wishaw
No of
Referrals
31 6 38 22 21 1Page 56 of 214

Page 57

Income via Social Security –GP Community Link Worker Programme
Brief Description Community Link Worker embedded within GP practices across North
Lanarkshire making referrals to information and advice services
Baseline From Action Plan 482 welfare rights referrals (22/23)
146 debt advice referrals (22/23)
Update There has been a decrease in the number of referrals from the Financial
Link Workers to advice services, this is against the trend from all other
referrers. 
In 23/24 welfare rights referrals were 333 and debt advice 133.  The
income generated from the welfare rights referrals totalled £252,504
Issues / Points to Note There has been some staffing changes within the Financial Link Workers
and this may be the cause of a decline in referrals, this will be addressed
with all parties involved in delivering this work.
The funding for this agreement for both the Tackling Poverty Team and
the External Providers is due to expire in March 2025. 
Task continues to
have ongoing work
Page 57 of 214

Page 58

Income Via Social Security Benefits – Overview of Health Referrals
Team total income
MacMillan £3,542,782
Health General £872,366
Health Visitor Pilot £144,251
Health and Wealth Project £1,738,154
Financial Link Workers £252,504
Integrated Addiction Services £0.00
total £6,550,056.12
Page 58 of 214

Page 59

North Lanarkshire Council
Report
Adult Care and Social Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    MD/MW/AMCG Date 12/11/24 
Quality Assurance Annual Report 2023/24 
From  Morag Dendy, Chief Officer (Performance, Planning & Quality Assurance)  
E-mail DendyM@northlan.gov.uk Telephone 
Executive Summary 
The remit of Quality Assurance is wide and varied. It includes ensuring governance through
monitoring and evaluating key aspects of social work practice and performance. A central
activity is the on-going contract management of external commissioned social care
providers. We continue to operate in an environment that is complex, so the sharing of best
practice and solution focused ideas are integral to ensure the people of North Lanarkshire
receive good quality support to help meet their outcomes. 
We remain committed to providing an annual report on activity carried out in the preceding
year, so this report is to update Committee on our Quality Assurance activity over the
annual period of 1 April 23 to 31 March 24. 
Recommendations
It is recommended that the Adult Care and Social Work Committee. 
(1) Note and endorse the contents of the report.
(2) Remit the report to Education, Children and Families Committee. 
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement
(12) Ensure our residents are able to achieve, maintain, and
recover their independence through appropriate supports at home
and in their communities
Programme of Work Resilient People
Item 6
Page 59 of 214

Page 60

1. Background 
1.1 This report highlights Quality Assurance activity over the period 1 April 23 to 31 March
24. It covers Contracts & Contract Management, Regulatory Activity, Procurement,
Complaints, Duty of Candour, Information Governance, Market Facilitation, In House
Monitoring, Safer Staffing & Communications. Full detail of these activities is included
in Appendix A. 
2. Report 
Contracts
2.1 Over the past year Quality Assurance have continued to strive to ensure that
purchased services have contractual arrangements in place with clearly defined terms
and conditions. These arrangements range from national frameworks to Individual
Placement Agreements which balance quality against cost to achieve overall best
value for services purchased to support people. As of 31 March 24, 98% of all social
work spend had the provision of a formal contracting arrangement. This is an increase
from 95%, reported in year 2022/23. 
Contract Management Framework
2.2 Adherence with the contract management framework is an integral component of the
processes in place to demonstrate commissioned services are adhering to terms and
conditions, outcomes are being achieved and that best value services are purchased.
Contract monitoring is also a framework to inform unmet need and future strategic
planning and commissioning.
2.3 Last year we reported on changes to be made to our contract management framework
from 1st April 2023. From the point of implementation and throughout the duration of
this reporting period, the Quality Assurance team have been evaluating the impact of
the modifications. This approach reflects one of a learning organisation and focuses
on our overarching aims which include monitoring our commissioned services to
enable effective partnership working, early intervention and the targeting of resources
to improve the experience of people. From the suite of documents which form the
contract management framework and were embedded in practice throughout 2023/24,
we have made further refinements.
2.4 The development of an Engagement and Participation Toolkit to support the inclusion
of direct stakeholder feedback and engagement by Senior Officers was a key addition
to the Contract Management Framework. Throughout this reporting period Senior
Officers have embedded a variety of methods to engage with a host of stakeholders
during monitoring activity. The feedback received has been invaluable in
understanding what good care looks like to people using services and their carers.
Regulatory Activity
2.5 As of 31 March 2024, there were 27 care homes within North Lanarkshire.  From these
27 care homes all 27 had been assessed by the Care Inspectorate under the key
question ‘How well do we support people’s wellbeing’.  There were no services
achieving grade Excellent, however, 3 (11.1%) of care homes achieved Very Good
under this key question.  Care homes assessed as Good and above totalled 18 which
is an overall percentage of 66.7%.  
Page 60 of 214

Page 61

2.6 49 commissioned Self-Directed Support (SDS)/Care at Home services were inspected
under the key question ‘How well do we support people’s wellbeing’. One service
received a grade of Excellent (6) for this key question.  Very good grades were received
by 55.1% of services and 87.8% of services received grades of Good or above. 
In House Monitoring Framework
2.7 Following on from the development of the In-House Monitoring Framework reported on
last year, this was approved by the Senior Leadership Team. Thereafter Homecare
services commenced with a test of change across all six localities. Quality Assurance
plan to carry out an evaluation of the In-House Monitoring Framework which will inform
any refinements or modifications that may be required prior to roll out across the
organisation.
Market Facilitation
2.8 The past financial year has been challenging across the sector and through market
facilitation, the team aim to support the social care sector through the right investment,
in the right support, so that the wider aims of citizenship, social inclusion and
community capacity can be achieved. 
2.9 Recruitment and retention of staff remains a challenge across the social care
workforce. Following on from the awards of Building Capacity Funding Phase 1 & 2
reported in last year’s annual report, North Lanarkshire Council facilitated a large-scale
recruitment and career event on 27th April 2023 in Motherwell Concert Hall. The event
was arranged to support our commissioned contractors to recruit suitable staff and in
turn to maximise their capacity to provide care and support to the people of North
Lanarkshire.
Support to Unpaid Carers
2.10 The Commitment to Carers Conference was held on 5 September 2023 at the Bellshill
Cultural Centre. The event was for carers, those who work with carers, and carer
providers in North Lanarkshire, with the aim of discussing what’s working well and how
we can further improve our services. 
2.11 We aimed to reflect and build on achievements across North Lanarkshire, finding out
what matters to carers and carer providers right now and sharing examples of how NLC
is listening and improving on how we work with our carers. 
  
2.12 Carer services were there to showcase the different kinds of support available to carers
and hearing what we can do to provide the support people across North Lanarkshire
need and want. 
Engagement & Participation Strategy 2024 - 2027
2.13 Over recent months a focused effort has been directed towards refreshing the
Engagement & Participation Strategy that will serve as the foundation across all areas
of our work.  In the development of the Strategy, we have actively engaged with
stakeholders; representatives of community-based organisations, supported people,
carers and staff teams. 
Page 61 of 214

Page 62

Procurement 
2.14 Quality Assurance support individual’s rights to determine the manner in which they
receive support, and this includes their right to select a contractor who is not on any
of our contract frameworks. On these occasions and following due diligence checks
of the preferred contractor, Individual Placement Agreements (IPA’s) are created to
ensure there is a legal basis between North Lanarkshire Council and the Contractor
for the delivery and manner of support. In the past year, 63 citizens of North
Lanarkshire chose this route for support. This approach in aligned to the principles of
Self-Directed Support. 
Safer Staffing 
2.15 Quality Assurance have been liaising with the Care Inspectorate, other local authorities,
commissioned services and internal colleagues to prepare for the implementation of
the Health and Care (Staffing) (Scotland) Act 2019 which will be enacted on 1st April
2024.
2.16 Between November 2023 and February 2024, Quality Assurance staff took part in a
test which was arranged by the Care Inspectorate on behalf of the Scottish
Government. North Lanarkshire were one of ten authorities involved in this. The
purpose was to gather information around how prepared commissioned services were
for the implementation of the act and any risks that could be identified due to the
implementation of the act. 
Complaints
2.17 Quality Assurance retains an overview role in terms of complaints made about Social
Work service provision. Regular quarterly reports on complaints activity are reported
through our governance structures.   205 complaints were received in the reporting
period, a decrease of 16 [7.5%] from 2022-2023, 109 of these related to Adult Services. 
Duty of Candour
2.18 Duty of Candour is a statutory duty on Scottish organisations providing health and
social care. The responsibility is to remain open and honest when something goes
wrong, that is not related to the course of the condition for which the person is receiving
care.
2.19 Work has been completed over the course to ensure our staff teams are fully aware of
the reporting requirements associated with Duty of Candour. Over this reporting
period, there were no Duty of Candour related incidents reported by North Lanarkshire
Council care and support services. 
3. Measures of success 
3.1 The Quality Assurance Annual Report captures activity undertaken during the period
1 April 2023 to 31 March 2024 and highlights progress made in key activities noted in
the last reporting period. Several developments are in progress or are planned for the
period 2024/25. 
Page 62 of 214

Page 63

4. Supporting documentation 
4.1 Appendix 1 – Quality Assurance Annual Report 2023/24
4.2 Appendix 2 – Annual Complaints Report 2023/24
4.3 Appendix 3 – Duty of Candour Report 2023/24 
Morag Dendy
Chief Officer (Performance, Planning & Quality Assurance) 
Page 63 of 214

Page 64

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 64 of 214

Page 65

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Publish the annual report on the website, to highlight assurance measures and
activity across social work services. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 65 of 214

Page 66

Quality Assurance
Annual Report 2023/2024 
Appendix 1
Page 66 of 214

Page 67

1. Introduction 
Quality Assurance have a role within most integral components of Adult Health & Social Care social
work. Activity focuses on procurement & commissioning, contract monitoring, engagement &
participation, support to carers and internal governance & development arrangements. Evaluation of
services provided to people to ensure they receive the right support at the right time underpins the
philosophy within the team. 
This year has brought the launch of our new Strategic Commissioning Plan 2023 – 2026 and alongside
the Plan for North Lan and the ambitions of the Quality Assurance team are aligned to these
programmes of work. 
Last year we reported on new and extended work plans for which the team has expanded both in
terms of numbers and skill mix. We have had additional Senior Officers and Resource Workers join
the team who bring with them varied and extensive knowledge of operational management within
the field of social care, within and out with North Lanarkshire Council. To recognise the breadth of
changes to the team dynamics and work activities and promote cohesiveness the team participated
in the Insights programme. The Operational Development Team facilitated this, and the outcomes
originally identified were achieved. 
Throughout the past year we have created a structured succession planning pathway from Resource
Worker to Senior Officer and this has been particularly effective, enabling two-way opportunities,
development and growth. 
The team collated the information to inform the Chief Social Work Officer Report 2022/23 and with
this being the first year this new approach has been taken a learning review highlighted key changes
to take forward to the report for 2023/24. We also collaborated with the Senior Leadership Team to
discuss social work self-evaluation.  Feedback has influenced and will continue to shape the
benchmark standards. 
The preparation for the transition from SWIS to Mosaic has been extensive and on-going. Quality
Assurance have had representation in every workstream. As part of the redesign of Home Support the
team have been involved in various workstreams supporting activity from supervision & observational
monitoring approaches to the review of the service criteria to the streamlining of personal support
plans (PSP’s) Quality Assurance are also involved in risk management activity around home support
as well as having membership on the Programme Board. 
Throughout the reporting period we have endeavoured to offer new supports to our In-House services
and locality teams with the test of change across homecare, our work on safer staffing and the
oversight we have of care inspectorate activity and actions plans. We also produced some guidance
for in house registered services completing annual returns to the Care Inspectorate. Senior Officers
are linked to localities, and they have been attending Community Care Operational Meetings, sharing
key information. We aim to continue to support operational colleagues to provide the best services
they can whilst embedding the Back2basics approach which even at this early stage has the potential
to enable the delivery of more appropriate interventions by the correct people. 
The Quality Assurance Team work collaboratively with a range of partners to embed the principles of
Self-Directed Support. The activities reported in this 2023/24 annual report reflects our commitment
to learn from what’s working well and what could be better to ensure people are central to all
decisions in their lives.  
Page 67 of 214

Page 68

2. Contracts 
Quality Assurance work alongside the Corporate Procurement Team to establish and work in
accordance with legal processes to support the procurement journey for all purchased services and
goods across social work.  This journey begins with identifying the contract route which is
proportionate to the risk level and value of the contract, to developing and designing tender
documentation right through to contract award and implementation. 
The role of Quality Assurance is to co-ordinate and facilitate all procurement activity whilst providing
advice and guidance to operational colleagues to enable them to devise service specifications which
clearly describes the service required and the outcomes to be achieved. Over the past year we have
continued to liaise with operational colleagues in a planned and ad hoc way, to ensure contracts are
clearly interpreted and applied in practice to ensure a consistency aligned to the strategic direction of
UNLHSC. We have agreed modifications to be made to current frameworks which will be progressed
in 2024/2025. 
We have strong links with our partners at Scotland Excel who are widely recognised for their expertise
in public procurement. The National Care Home Contract has existed since 2006 and it provides a
contractual platform offering transparency and consistency for both purchasers and providers of older
people residential and nursing care home placements.  Scotland Excel are the owners of this contract
and North Lanarkshire have bought into this meaning that all commissioned care homes for elderly
people in North Lanarkshire are subject to the terms and conditions of this contract. 
The National Care Home Contract contains shared terms and conditions in relation to the
arrangements around placements in Scotland including the weekly charges. Weekly charges are
reviewed annually by Scotland Excel, in consultation with the Scottish Government, COSLA and Scottish
Care (on behalf of providers) 
Scotland Excel are currently redesigning the National Care Home Contract as since it’s development in
2006 there have been significant changes to the social care environment. Providers have on an annual
basis signed up to a new minute of variation to reflect annual uplifts however there is a commitment
to an overhaul of the contract to reflect the current social care landscape including workforce &
retention challenges, cost of living impacts, changing demographics/more complex needs of the care
home population and the ambition to reflect a model which champions ‘outcomes focused and
responsive care’ rather than ‘adequate care’. The Quality Assurance Team are involved in discussions
around this redesign, and we hope to shape and influence meaningful change which will be to the
benefit of people living in a care home, their carers/families and local authorities when placing people
and monitoring the achievement of outcomes and overall quality of service thereafter. 
Over the past year Quality Assurance have continued to strive to ensure that purchased services have
contractual arrangements in place with clearly defined terms and conditions. These arrangements
range from national frameworks to Individual Placement Agreements which balance quality against
cost to achieve overall best value for services purchased to support people. 
Page 68 of 214

Page 69

Tables 2a and 2b below illustrate that as of 31 March 24, 98% of all social work spend had the provision of a formal contracting arrangement. This is an
increase from 95%, reported in year 2022/23. Quality Assurance continue to progress with the necessary arrangements to ensure all spend has robust
contractual and legal agreements in place; however, it should be noted that due to the fluidity of contracting and commissioning, achievement of 100%
compliance may not always be possible.   
Table 2a 
98%
2%
No of Contracts 2023/2024
Contracts in Place In Development
95%
5%
No of Contracts 2022 /2023
Contracts in Place In Development
Page 69 of 214

Page 70

Table 2b 
There are currently 303 provider organisations that we contract with, and this is a decrease of two from the figure reported last year and as highlighted
above. The number of out of authority care homes being utilised has reduced which is a positive as it can be assumed that more people are being placed
closer to home. There has also been a decrease in residential schools. 
It can be seen from the graphs above that non framework self-directed support and non-traditional respite packages have increased since last year as have
3rd sector and voluntary providers.   
Skyview Care Home closed in June 2023, and this accounts for the reduced number of North Lanarkshire Council commissioned care homes. 
10
4
27
12
141
3
10
2
7
4
9
9
4
61
0 20 40 60 80 100 120 140 160
3rd Sector / Voluntary
Advocacy
Care Home (NLC)
Care Home Cross Border
Care Home Out of Authority
Carers Network
Fostering & Continuing Care
Mental Health
Misc
Non Framework Self Directed Support
Non Traditional Respite
Residential Schools
Secure Services
Self Directed Support
Spread of Providers 2023/2024
7
4
28
9
148
3
11
2
3
5
1
6
13
4
61
0 20 40 60 80 100 120 140 160
3rd Sector / Voluntary
Advocacy
Care Home (NLC)
Care Home Cross Border
Care Home Out of Authority
Carers Network
Fostering & Continuing Care
Justice
Mental Health
Misc
Non Framework Self Directed Support
Non Traditional Respite
Residential Schools
Secure Services
Self Directed Support
Spread of Providers 2022/2023
Page 70 of 214

Page 71

It is envisaged that over the coming year new providers will be added to the Self-Directed Support
Framework when it opens to new tender applications. This will further build capacity across North
Lanarkshire.
3. Contract Management Framework (CMF) 
Last year we reported on changes to be made to our contract management framework from 1st April
2023. From the point of implementation and throughout the duration of this reporting period, the
Quality Assurance team have been evaluating the impact of the modifications. This approach reflects
one of a learning organisation and focuses on our overarching aims which include monitoring our
commissioned services to enable effective partnership working, early intervention and the targeting
of resources to improve the experience of people. 
Adherence with the contract management framework is an integral component of the processes in
place to demonstrate commissioned services are adhering to terms and conditions, outcomes are
being achieved and that best value services are purchased. Contract monitoring is also a framework
to inform unmet need and future strategic planning and commissioning. 
The development of an Engagement and Participation Toolkit to support the inclusion of direct
stakeholder feedback and engagement by Senior Officers was a key addition to the Contract
Management Framework. Throughout this reporting period Senior Officers have embedded a variety
of methods to engage with a host of stakeholders during monitoring activity. The feedback received
has been invaluable in understanding what good care looks like to people using services and their
carers. It has also enabled solutions to be found when potential improvements have been raised with
Senior Officers. The Quality Assurance team will continue to analyse the information collated and
quarterly performance reports during 2024/25 will include statistical and impact information resulting
from the direct engagement. 
From the suite of documents which form the contract management framework and were embedded
in practice throughout 2023/24, we have made further refinements as outlined below: - 
• Quarterly returns are now specific to the type of service being provided e.g. Care Home,
Support Provider or Funded Organisation.
• Monitoring Visit Report now has mandatory and optional components included within its
format which enables Senior Officers to focus their monitoring activity based on other
intelligence received.
• Monitoring Prioritisation Assessment form care service risks more clearly highlighted meaning
that tier ratings allocated to commissioned services are more aligned to live circumstances.
• Contract Monitoring Compliance Tool and sampling system designed to ensure fairness,
consistency and an evidence base within our application of the contract monitoring
framework.
• Information available or received through other means no longer requested from
commissioned services.
• To support our Adult Protection Committee a range of information is being gathered around
the delivery of training to our commissioned services.
• Additional systems for the analysis of data received have been developed to ensure that
patterns and themes are established and understood. 
The refinements outlined above have been made because of using the documents and tools and from
gathering feedback from our commissioned services and audit and risk colleagues. With this same
ethos our aim for 2024/25 is to have an on-going philosophy of co-design of our contract management
Page 71 of 214

Page 72

framework and we have had almost 25 commissioned services commit their time to a planned working
group. This approach is in line with ethical commissioning which we will speak more about later in this
report.
The Monitoring Prioritisation Assessment (MPA) provides a tool to enable Senior Officers to assess
the level of risk associated with each commissioned service. MPA’s are carried out following
submission of quarterly returns by commissioned services and analysis of the data provided by Senior
Officers. MPA’s will also be reviewed following monitoring visits as a matter of routine performance
measurement. Other significant events highlighting deficiencies in the quality of care may also trigger
a new MPA to be completed. The outcome of the MPA determines the level of monitoring activity to
be applied as a way of supporting improvements and applying a level of scrutiny which is aligned to
the risk. MPA’s and monitoring visit reports form the record of discussions and recommendations
agreed between Senior Officers and commissioned services. 
Each Tier suggests a minimum monitoring frequency as set out in Table 3a below 
Table 3a 
STATUS INDICATED MONITORING LEVEL
Purple Large Scale Investigation (LSI) or
Service Closure Processes that are
imminent within 6 months 
Red Significant concerns in relation to
service performance, contract
compliance.
TIER 4
Contract monitoring visit frequency – 1 to
4 weekly. 
Amber  Moderate concerns in relation to
service performance, contract
compliance
TIER 3
Contract monitoring visit frequency –
variable, at least quarterly but no more
than monthly.
Yellow Minor concerns identified in
relation to service performance
and contract compliance
TIER 2
Contract monitoring visit frequency –
variable, at least bi-annually but no more
than quarterly.
Green Service performance, contract
compliance and engagement are
satisfactory.
TIER 1
Contract monitoring visit frequency –
annually in most cases. 
Page 72 of 214

Page 73

We reported last year about the significant improvements the Quality Assurance team had made to the suite of documents which form the Contract
Monitoring Framework. We have seen a more consistent approach to the monitoring of contracts across the team. 
Table 3b highlights Tier Levels as reported at the end of 2022/23 and for the same time in 2023/24.  An improved picture can be seen in terms of Tier 4
services which have decreased to 0%. 
When comparing the lower Tier ratings (1 & 2) across both reporting periods there was no overall change and the same is the case with Tiers (3 & 4)
Overall, the majority of providers are Tiered within the lower tier rating categories. This is positive as the intensity and frequency of Care Inspections and
our monitoring activity has been enhanced. 
Table 3b 
Tier 1 Tier 2 Tier3 Tier 4
Q4 2023 to 2024 68% 25% 7% 0%
Q4 2022 to 2023 85% 8% 4% 3%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
Commissioned Providers Q4 Tier Ratings 2022/2023 &
2023/2024
Page 73 of 214

Page 74

4. Regulatory Activity 
Table 4a below details an analysis of the key question “How well do we support people’s wellbeing”. The data has been extracted from Tables 4b and 4c below.
North Lanarkshire Care Homes performance measures lower than Scotland wide care homes in that 66.7% of grades of 4 and above were awarded. Scotland
wider care homes achieved 74.8% of grades of 4 and above. From the figures below it would appear that North Lanarkshire care homes seem to have an
overall average of grades ranging between adequate and good.  An improvement area would be to start to focus on why very few care homes are achieving
good or above grades.   
127 Scotland wide care inspections are reported below.  Please note some care homes have not been inspected or have not been inspected under this key
question. 
Table 4a - Please note North Lanarkshire care homes are not included in the overall Scotland wide figures. 
How well do we support people’s wellbeing  Number of Care Homes
Assessed 
Grades Awarded  Percentage 
North Lanarkshire Care Homes (Table 4b)  27  0 x Excellent 
3 x Very Good 
15 x Good 
5 x Adequate 
4 x Weak 
0 x Unsatisfactory 
0% 
11.1% 
55.6% 
18.5% 
14.8% 
0% 
Scotland Wide Care Homes (Table 4c)  127  0 - Excellent 
39 x Very Good 
56 x Good 
30 x Adequate 
2 x Weak 
0 x Unsatisfactory 
0% 
30.7% 
44.1% 
23.6% 
1.6% 
0% 
Page 74 of 214

Page 75

Table 4b 
The tables above differ slightly in that the key question ‘How good is our care and support during the COVID 19 pandemic’ continues to feature in 2022/23
however in 2023/24 this key question had been merged into key question 1 and no longer featured as a stand-alone key question. 
As of 31 March 2024, there were 27 care homes within North Lanarkshire.  From these 27 care homes all 27 had been assessed by the Care Inspectorate
under the key question ‘How well do we support people’s wellbeing’.  There were no services achieving grade Excellent, however, 3 (11.1%) of care homes
achieved Very Good under this key question.  Care homes assessed as Good and above totalled 18 which is an overall percentage of 66.7%.   
The care homes who were assessed as Very Good under the key question ‘How do we support people’s wellbeing’ were Blair House, Kirknowe, and
Summerlee. 
How well
do we
support
people's
wellbeing?
How good
is our
leadership
?
How good
is our staff
team?
How good
is our
setting?
How well
is care and
support
planned?
How good
is our care
and
support
during the
COVID-19
pandemic?
Adequate 2022/2023 10 5 5 3 4 1
Good 2022/2023 11 15 10 6 8 4
Very Good 2022/2023 4 1 1 3 0 0
Weak 2022/2023 2 1 0 0 2 0
0246810121416
Care Inspection Grades  - North Lanarkshire Based
Care Homes As At 31/03/2023
How well
do we
support
people's
wellbeing?
How good
is our
leadership?
How good
is our staff
team?
How good
is our
setting?
How well is
care and
support
planned?
Adequate 2023/2024 5 7 3 5 2
Good 2023/2024 15 13 9 6 9
Very Good 2023/2024 3 2 1 2 0
Weak 2023/2024 4 3 0 3 2
Unsatisfactory 2023/2024 0 1 1 0 0
0246810121416
Care Inspectorate Grades -North Lanarkshire based
Care Home as at 31/03/2024
Page 75 of 214

Page 76

From 27 care homes, 13 had been assessed under the key question ‘How well is care and support
planned’.  From the 13 that had been assessed 9 care homes received grades of Good and above.
This is an overall 69.2%.  
During the reporting period Centenary House continued to be subject to Large Scale Investigation
(LSI) until 11 October 2023.  An improvement notice was also served by the Care Inspectorate to
Centenary House on 12 July 2023 following grades of unsatisfactory being awarded in two key
questions. The table above highlights the grades under key questions ‘How good is our leadership’
and ‘How good is our staff team’. 
The improvement notice at Centenary House was subsequently removed in December 2023
following significant improvements being identified by the Care Inspectorate. 
Six care homes during the reporting period were closed to admissions due to agreeing to a voluntary
moratorium.  One care home had an enforced moratorium placed upon them.  The reasons for
application of moratoriums were due to concerns around the quality of care being provided and to
allow care home providers the opportunity to make the necessary improvements. 
Table 4c 
How well do
we support
people's
wellbeing?
How good is
our
leadership?
How good is
our staff
team?
How good is
our setting?
How well is
care and
support
planned?
Adequate 2023/2024 30 27 19 12 25
Excellent 2023/2024 0 1 0 1 0
Good 2023/2024 56 44 34 37 38
Very Good 2023/2024 39 40 15 9 13
Weak 2023/2024 2 2 1 2 1
0
10
20
30
40
50
60
Care Inspectorate Grades - Care Home as at 31/03/2024 (excluding NLC)
Page 76 of 214

Page 77

Care Homes in Scotland (excluding North Lanarkshire): 
North Lanarkshire Council currently has people placed within 141 care homes that are located
elsewhere in Scotland. The total number of people placed within these care homes from North
Lanarkshire is 169. Contract Monitoring activity is carried out by the host authority where the care
home is geographically located although care management responsibilities remain with North
Lanarkshire Council for individuals placed. Individual Placement Agreements are implemented for
individuals and these agreements detail the basis for care and support. 
North Lanarkshire Council are notified of any Large-Scale Investigation activity or potential scenarios
which may lead to the closure of the home e.g. Care Inspection Enforcement Action, Liquidation etc. 
Quality Assurance are currently leading on a subgroup from the Contracts and Commissioning Practice
Network in relation to Care Homes. It has been evident from this activity that commissioned services
and local authorities would benefit from a level of consistency in the application of contract
monitoring. We hope to take this forward in 2024/25 to further shape, develop and share best
practice as a sector. 
How well do
we support
people's
wellbeing?
How good is
our
leadership?
How good is
our staff
team?
How good is
our setting?
How well is
care and
support
planned?
How good is
our care and
support
during the
COVID-19
pandemic?
Adequate 2022/2023 32 24 22 9 17 10
Excellent 2022/2023 0 1 0 0 0 0
Good 2022/2023 60 47 28 36 37 2
Unsatisfactory 2022/2023 1 1 1 0 1 0
Very Good 2022/2023 29 30 12 6 8 2
Weak 2022/2023 3 3 1 3 1 0
0
10
20
30
40
50
60
70
Care Inspection Grades for Care Homes in Scotland (Excluding
North Lanarkshire) as at 31/03/2023
Page 77 of 214

Page 78

Table 4d 
How well do we
support people's
wellbeing?
How good is our
leadership?
How good is our staff
team?
How good is our
setting?
How well is care and
support planned?
Adequate 2023/2024 3 8 1 0 3
Excellent 2023/2024 1 0 0 0 0
Good 2023/2024 16 20 9 2 9
Very Good 2023/2024 27 16 7 1 7
Weak 2023/2024 2 2 2 0 2
0
5
10
15
20
25
30
Care Inspectorate Grades - Self Directed Support including Care at Home as at
31/03/2024
How well
do we
support
people's
wellbeing?
How good
is our
leadership
?
How good
is our staff
team?
How good
is our
setting?
How well
is care and
support
planned?
How good
is our care
and
support
during the
COVID-19
pandemic?
Care &
Support
Environme
nt Staffing
Managem
ent &
Leadership
Adequate 2022/2023 7 7 2 0 3 0 0 0 0 0
Excellent 2022/2023 1 0 0 0 0 0 3 0 0 1
Good 2022/2023 8 9 5 1 4 0 3 0 3 8
Very Good 2022/2023 11 6 3 1 3 0 19 1 9 10
Weak 2022/2023 0 0 1 0 0 0 0 0 0 0
0
5
10
15
20
Care Inspection Grades-Self Directed Support including Care at Home as at
31/03/2023
Page 78 of 214

Page 79

Self-Directed Support (SDS) including Care at Home: 
The tables above highlighting the Care Inspectorate grades for Self-Directed Support (SDS)/Care at
Home Providers 2022/23 and 2023/24 vary as in 2022/23 a high volume of providers had not been
inspected under the current Care Inspectorate methodology and therefore the previous methodology
areas were included within the graph. 2023/24 focuses solely on care inspections which have taken
place under the new methodology. 
Some services continue not to have been inspected under the new framework which highlights that
no inspection activity has been undertaken for several years. We understand this is due to recovery
from the pandemic and that inspection activity is prioritised based on risk and other intelligence being
received. This includes information submitted in annual returns, notifications of accidents/incidents
and complaints. 
There are 50 commissioned SDS/Care at Home services that have been inspected by the Care
Inspectorate under the new methodology framework and these are highlighted above in table 4d.   
49 commissioned services were inspected under the key question ‘How well do we support people’s
wellbeing’. One service received a grade of Excellent (6) for this key question.  This was Support for
Ordinary Living (SOL).  Very good grades were received by 55.1% of services and 87.8% of services
received grades of Good or above. Lifeways Community Care were not inspected under this key
question. 
Under the key question ‘How well do we support people’s wellbeing’, 4% of services received grades
of Weak.  This consisted of 2 services who were Cera Care and Care 1 Professional.  Both services
continue subject to moratorium at the end of this reporting period.  The reasons for the moratoriums
were due to the quality of care assessed by the Care Inspectorate.  Application of the moratorium is
to support the provider to make the necessary improvements required. One provider agreed to this
arrangement on a voluntary basis and an enforced moratorium was applied for the other. 
From the 50 commissioned services, 21 were inspected by the Care Inspectorate under the key
question ‘How well is care and support planned’.  Of these 33.3% received grades of Very Good and
76.2% received grades of Good or above. 
5. In House Monitoring 
Following on from the development of the In-House Monitoring Framework reported on last year, this
was approved by the Senior Leadership Team. Thereafter Homecare services commenced with a test
of change across all six localities. Quality Assurance plan to carry out an evaluation of the In-House
Monitoring Framework which will inform any refinements or modifications that may be required prior
to roll out across the organisation 
The aim of the In-House Monitoring Framework is to support implementation of best practice and a
culture of continuous improvement. It includes a cycle of on-going self-evaluation and monitoring,
with triangulation of evidence across management tiers and sections. Services will be enabled to
reflect on what they are doing well, what they could do better and to plan for change and
improvement. 
Quality Assurance plan to facilitate learning opportunities for In House Services particularly around
the use of quality improvement tools and methodologies. The team are currently developing
workshops and materials whilst liaising with key staff around ways of enhancing the support that they
Page 79 of 214

Page 80

can provide to in house services to share knowledge of developments, opportunities and change
within the social care landscape. 
6. Market Facilitation 
The Quality Assurance team continues to promote, stimulate and support market facilitation across
the social care provider framework and the community and voluntary sector (CVS) whilst remaining
outside of the market. Our approach is based on strategic intervention, relationship building, light
touch intervention and supporting beneficial new relationships and activities that lead to resilient and
sustainable approaches, which in turn lead to continuous improvement, improved ways of working
and an active learning cycle whereby planning impacts on delivery, review and learning. The past
financial year has been challenging across the sector and through market facilitation, the team aim to
support the social care sector through the right investment, in the right support, so that the wider aims
of citizenship, social inclusion and community capacity can be achieved. 
Page 80 of 214

Page 81

Provider Recruitment Event - Recruitment and retention of staff remains a challenge across the social
care workforce. Following on from the awards of Building Capacity Funding Phase 1 & 2 reported in
last year’s annual report, North Lanarkshire Council funded and facilitated a large-scale recruitment
and career event on 27th April 2023 in Motherwell Concert Hall. The event was arranged to support
our commissioned contractors to recruit suitable staff and in turn maximise their capacity to provide
care and support to the people of North Lanarkshire. 
Over 20 social care providers took part in the event and have since reported having recruited various
numbers of staff, arising from attendees on the day. A survey was carried out on the day which
highlighted 65% of people completing this had applied for jobs during the event. 95% intended making
applications following the event.
Feedback from those who attended the event included: 
Page 81 of 214

Page 82

Building Capacity Funding Phase 3 – Additional financial support was offered to Care at Home
Providers during the reporting period. The award was made to help create capacity and in recognition
of the complexity and frailty of people Care at Home Providers support and to finalise the transition
from a ‘Time & Task’ model to ‘Individual Budgets’, fully supporting the principles of Self-directed
Support.   This approach ensures people accessing services have better choice and control over who
supports them and how the support to meet their outcomes is met.
Provider Capacity Portal – Quality Assurance and the Adults Team have been working with our Self-
Directed Support (SDS)/Care at Home Commissioned services to establish a system to report available
capacity to provide a new service. We have long recognised the demands for both social work staff
and services in knowing who to make contact and with when either a service needs to be secured or
capacity needs to be built upon.
Throughout this year we have developed a portal whereby all commissioned services initially report
their available capacity and then continue to update this as and when it occurs. The portal will be
monitored by Adults/QA teams and our social work teams will have access to the data. 
A test of change took place with 5 providers and some feedback was provided which resulted in some
refinements. We are pleased to advise that early into 2024/25 reporting period the portal will become
live.
7. Support to unpaid carers 
Since the introduction of the Joint Partnership Statement detailed in last year’s annual report, a range
of further developments to support carers have taken place. These have been part of Quality
Assurance’s wider approach to Market Facilitation, to help broaden choice, control and support
options for carers. Initiatives have included:  
• An innovative Hospital Discharge Payment Scheme for Carers – to reduce the risk of delayed
discharge arising from wait times for social care provision.
• Expansion of Carer Breather- an innovative Community Solutions approach to ensuring that
carers, whether known to services or not, can access regular breaks from caring.
• Increased funding to PAMIS to build capacity in the PAMIS Family Support Service, offering
support to families caring for someone with profound, complex multiple disabilities.
• Support for Dementia Carers through Alzheimer’s Scotland Dementia Carer Link Workers.
• Extended contract for HOPE for Autism, removing the uncertainties arising from year-to-year
annual funding.
• Investment in practitioners from Autism Network to ensure that we have access to specialist
knowledge around neurodivergence.
• Further investment in Lanarkshire Carers to enhance existing programmes of carer support.
• Continued support for Action for Children Young Carers Project.
• Improved education opportunities for Social Work staff around commissioned organisations,
Adult Carer Support Plans, carer budget processes and Young Carer Statements
• Organising carer awareness events in tandem with the Assistive Technology team, to promote
the uptake of assistive technology as a means of supporting both carers and those being cared
for.
• Supporting a range of engagement and participation activity aimed at all carers, but with a
focus on underrepresented individuals, groups or communities, including carers from minority
ethnic communities and LGBTQ+ communities.
Page 82 of 214

Page 83

• Where applicable, continued promotion of Carer Budgets and support around innovative use
of these.
• Preparation in anticipation of forthcoming legislation around the right to carer breaks,
including an updated Short Breaks Statement.
• Preparatory work around the next Carers Strategy for North Lanarkshire. 
Developments in carer support around Dementia and Autism were informed by findings from the most
recent national Carer Census, where these conditions, along with age related frailty, were identified
as being the three largest areas of caring responsibility. With regard to frailty, North Lanarkshire has
been a pathfinder area in the national Getting it Right for Everybody (GIRFE) approach, and whilst
colleagues from other parts of University Health and Social Care are leading on this, Quality Assurance
have also been directly involved.   
In addition to the detail noted above, a wide range of age related, or condition specific community and
voluntary sector organisations were in receipt of North Lanarkshire Council funding and had a role
within direct, or indirect, support to carers. Work around monitoring and quality evaluation regarding
carer support across these organisations took place throughout the year. 
The Commitment to Carers Conference was held on 5 September 2023 at the Bellshill Cultural Centre.
The event was for carers, those who work with carers, and carer providers in North Lanarkshire, with
the aim of discussing what’s working well and how we can further improve our services. 
We aimed to reflect and build on achievements across North Lanarkshire, finding out what matters to
carers and carer providers right now and sharing examples of how NLC is listening and improving on
how we work with our carers. 
Carer services were there to showcase the different kinds of support available to carers and hearing
what we can do to provide the support people across North Lanarkshire need and want. 
Page 83 of 214

Page 84

8.  Participation and Engagement 
There has been continued focus on further developing our overall approach to invest and resource
engagement and participation that ensures the voices of supported people; carers and our
communities are strengthened. 
Co-production work has been ongoing to refresh the Engagement and Participation Strategy 2024-27.
There have also been several stakeholder events held to help shape content and ensure the National
Standards for Community Engagement, promoted by Scottish Community Development Centre, have
been applied throughout. 
As part of the work to refresh the
Strategy led by the Strategic Engagement
and Participation Working Group
(SEPWG), a visual diagram has been
designed to show the three main areas of
investment that supports Engagement
and Participation across our communities
(Community, Carers and Supported
People). The diagram, highlights our
ambition to ensure strong voices to: 
• Improve communication and
increase connections. 
• Increase awareness of what
matters.
• Increase capacity for early
intervention and prevention. 
Following on from the successful procurement exercise resulting in a contract award to North
Lanarkshire Disability Forum (NLDF) as the lead partner, alongside Lanarkshire Links and Voice of
Experience Forum, as reported to Committee in September 2023, work has begun again on the
recommendations from an independent review of our engagement and participation structures
concluded in June 2022. 
There is a long history of engagement and participation in North Lanarkshire and the strength of
connection across our network continues to promote involvement and representation to amplify
voice. There have been some key achievements over the past year as set out below. 
Engagement and Participation Strategy 2024 – 2027 - Over recent months a focused effort has been
directed towards refreshing the Engagement & Participation Strategy that will serve as the foundation
across all areas of our work.  In the development of the Strategy, we have actively engaged with
stakeholders; representatives of community-based organisations, supported people, carers and staff
teams. 
Learning from these sessions has highlighted what is considered good engagement and participation
and provided confirmation that the refreshed strategy should: 
Page 84 of 214

Page 85

• Be short and user friendly.
• Be an overarching strategy that can guide communication and action planning across all
areas of services and supports.
• Build from the current strategy, including what we have learned and what people have told
us. 
It is anticipated that the Strategy will support all stakeholders across our networks as it is written in
plain English to ensure it is accessible to people who do not work in the sector but have an interest or
are receiving services and supports. 
Strategic Engagement and Participation Working Group - The primary function of the Strategic
Participation and Engagement Working Group (SEPWG) is to drive forward the principles aligned to
our Engagement and Participation Strategy. This group was re-established in the last year and has led
on the coordination and development of the Strategy 2024-27. 
The group brings together representation from across the authority and includes people who have a
role to support and develop engagement and participation. The primary objective is to coordinate
various activities aimed at fostering robust and effective engagement and participation across North
Lanarkshire. 
Its purpose is to streamline and synchronise initiatives that prioritise community involvement,
ensuring that the voices, needs, and perspectives of people in North Lanarkshire are not just heard but
actively integrated into the design and delivery of our services. 
Embedding Participation - There has been good progress to increase the resource and capacity across
community-based organisations to strengthen the voice of supported people, including those harder
to reach e.g. BAME, LGBTQI+ and those in more rural communities. 
We recognise the importance in ensuring that engagement and participation is meaningful and not
tokenistic, so the principles of engagement and participation are now included in the Staff Induction
programme, both as written information and as a direct input to programme for new social work and
social care practitioners. 
A wide range of stakeholders have been actively engaged in the development of the Strategy through
consultation and direct involvement. Promotion to implement the Strategy will be a shared
responsibility and will include awareness raising and the development of practical tools to support:
• An evidence base on how people experience services and how their experience shapes and
improves future development of services and supports.
• The voice of supported people in our communities 
• Increased capacity for early intervention and prevention. 
• Two-way communication and a strengthened feedback loop back to decision makers
• Increased feedback and the role of lived experience in improvement of services and
supports.
• Increased connections with supported people and communities that are harder to engage
with.
• Increased awareness about what is important to supported people and their communities. 
The refresh of our Locality Planning Group arrangements and alignment with the Locality Planning
Teams and Community Boards is underway.  Once finalised, this will provide sector, locality, and
thematic forums, which can be influenced and shaped through engagement and participation with our
Communities, Carers and Supported People. 
Page 85 of 214

Page 86

Care Opinion - We recognise the importance of feedback, so have actively promoted the use of Care
Opinion, which is an independent, non-profit, web-based feedback platform where people submit
stories to share their experiences of health and social care services. These can be both positive and
negative. They are moderated and quickly forwarded to the relevant area of service who can respond
directly to the story. Since 2020:
• 310 stories have been submitted through Care Opinion by people of North Lanarkshire. 
• 239 of these stories have been shared in the year April 2023-March 2024.
• Most stories received a response from the service within 24 hours.
2024/2025 will see the introduction of a Care Opinion Newsletter which the Quality Assurance team
will produce. This will enable feedback to be shared across networks as well as being another way of
promoting the use of Care Opinion. The Care Opinion Newsletter will celebrate positive feedback and
will highlight the lessons learned from less than positive comments received.
9. Communications 
Quality Assurance have a key function within the area of communication. This includes the following
responsibilities: - 
• Overseeing and updating North Lanarkshire Council (Social Work) and UHSCNL websites
• Facilitating, compiling and distributing the Public Protection Newsletter
• Governing social work resources, policies and procedures held on our SharePoint site
• Are owners and administrators of Viva Engage – which includes responding to queries and
sharing updates in relation to Subject Access Requests and Resources, Policies & Procedures 
Social Work Policies & Procedures – Quality Assurance have established a policy review group with
representation from all sections of social work including headquarters and localities. The aim of this
group is to keep policies and procedures up to date with the appropriate owner and review date
detailed. Policy control documents will ensure that the correct versions are being utilised at all times.
Quality Assurance are the owners of this site and any edits made by social work colleagues must be
uploaded by Quality Assurance. 
Representatives of this group will be responsible for liaising with their sections to be the link person
for communicating changes required due to legislative requirements or other relevant factors. 
Over the next few months, a key aim is to have a register of all policies and procedures required across
social work and a plan for reviewing implemented. 
Social Work Induction & Development – Talent and Organisational Development have recently
developed a robust Social Work Induction programme and have also linked some materials into the
Corporate Induction which is used for all North Lanarkshire Council employees.  There is a vast amount
of resources and materials available within the Social Work Induction programme which allows new
employees to understand their new role.   
Page 86 of 214

Page 87

Quality Assurance have taken ownership of the Induction Programme with the aim of further
developing the material and localising the content to the “approach of North Lanarkshire”. At this time
a selection of representatives has been agreed across social work departments and they will be
responsible for attending meetings and communicating changes and additions required to the
induction and development programme to ensure it remains current and up to date and is the
standardised approach to induction and development planning across social work. This work is in the
early stages with all ideas for inclusion currently being considered.
Quality Assurance Newsletter – Over the reporting period the newsletter was reestablished. This
reports on key activity across the department. Moving forward we are keen to have engagement from
commissioned services including the sharing of good news stories such as achieving high quality. A
focus for the year ahead is to refresh the newsletter utilising other available platforms to engage a
wider audience.
10. Information Governance 
We have legal and ethical duties in relation to handling and managing information to a high standard,
and to improve in a transparent, fair, consistent, and secure way, with people always at the forefront
of our minds.
Our Information Governance Framework allows us to deploy our responsibilities and for social work
this key function sits within the portfolio of the Quality Assurance Team. Our core group of Resource
Workers with oversight from a Senior Officer are responsible for coordinating requests which include: 
o Subject access requests (SARs) including Information Commissioner’s Office (ICO)
reviews and complaints.  
o FOISA (Freedom of information requests) including Scottish Information
Commissioner reviews and complaints.  
o GDPR breach notifications  
o Data protection impact assessments (DPIAs)  
o DPA or schedule 2 requests 
o Annual ICO Stats 
o Quarterly Corporate KPI’s
o Quarterly SAR stats  
Resource Workers liaise with the Freedom of Information Team and Data Protection Team who share
their expert knowledge to guide internal processes in accordance with legislation.    
Over the reporting period there has been a focus on coaching/mentoring/training locality admin staff
in relation to SARs and SARs recording. This follows on from the review and update of SAR’s recording
systems. All reporting and monitoring systems within Quality Assurance for capturing information
governance data have been developed and enhanced. This work has assisted with having the most up
to date and accurate records available.   
Page 87 of 214

Page 88

11. Procurement 
Quality Assurance continues to lead on procurement activity for all social work services and collaborate with colleagues within Corporate Procurement,
Service Leads and Locality Social Work Teams to ensure joined up planning, clear procurement processes and subsequent contract monitoring arrangements.
This ensures that all commissioned contract work delivers best value, in accordance with Procurement Reform Scotland Act 2014 and the Procurement
(Scotland) Regulations 2016. 
Quality Assurance support individual’s rights to determine the manner in which they receive support, and this includes their right to select a contractor who
is not on any of our contract frameworks. On these occasions and following due diligence checks of the preferred contractor, Individual Placement
Agreements (IPA’s) are created to ensure there is a legal basis between North Lanarkshire Council and the Contractor for the delivery and manner of
support. In the past year, 63 citizens of North Lanarkshire chose this route for support. 
In the last year, Quality Assurance have supported colleagues within our adult & finance teams to review the Councils’ Self-directed Support Option 1 Direct
Payments, processes and documents. This work is extensive and includes support from Legal colleagues and has included:
•  review of internal processes with supporting documentation 
• creating systems that will enable recipients of Direct Payments to send required documentation and annual financial information directly to Localities 
It is anticipated this work will be concluded by the end of the next financial year. 
11a describes the procurement activity for Contracts over £50,000 undertaken in 2023/24. 
Contract Title Contract Overview Service Area /
Procurement Category
Total Value of
Contract (Excl VAT)
Contract Start Date Contract End Date 
Admin of
Engagement &
Participation
(Supported People)
Provision of this Contract reinforces the
Council’s commitment to ensure ongoing
meaningful involvement with the
communities that we serve. 
Adult Services / Social
Care Services
£900,000.00 02/10/2023 01/10/2026
Page 88 of 214

Page 89

Aids for daily living The service covers the North Lanarkshire
area for equipment and adaptations
requests from North Lanarkshire and the
whole of Lanarkshire for NHS Lanarkshire
requests.
Adult Services / Aids &
Equipment
£2,500,000.00 01/12/2023 31/05/2026
Coming Home
Strategy - Advocacy
The current brief of the service for adults
needs to be extended due to the “Coming
Home” report and the need for additional
advocacy provision that this duty places
upon the Health and Social Care
Partnership.
Adult Services / Social
Care Services
£90,895.00 01/07/2023 30/06/2025
Counselling Services
for Care Experienced
Young People
Based within Intensive Services Hub, Cecil
Street, Coatbridge and work with 16–25-
year-olds who have experienced trauma
and adversity. 
Education, Families &
Justices/ Social Care
Services
£200,000.00 10/04/2023 09/04/2024 plus 3, 1
Year Extensions
available
Dementia – post-
diagnostic support
for carers
Specialist support to carers who
frequently report great difficulty and high
levels of stress whilst caring for relatives
affected by Alzheimer’s. 
Adult Services / Social
Care Services
£498,000.00 01/06/2023 31/03/2025
Digital Counselling
Service and Online
Platform of Support
Funding had been allocated from within
Scottish Government’s Mental Health
Services allocation to the Council to pay
for the solution in year 1. 
Education, Families &
Justices/ Social Care
Services
£400,000.00 29/01/2023 30/01/2024, plus 3, 1
Year Extensions
available
Making Life Easier
North Lanarkshire
Online resource offering information,
professional advice and direct access to
services and support for individuals in
North Lanarkshire. This service allows
individuals to obtain information and/or
complete self-assessments, promoting
early prevention and self-management.
Adult Services / Social
Care Services
£291,268.92 01/08/2023 31/07/2026, plus 1
Year Extension
Available
Supply, Installation
and Servicing of
Stairlifts and Hoists
ADL provides specialist equipment and
housing adaptations that support people
to live independently in their own homes. 
Service covers the North Lanarkshire area
for equipment and adaptations both
Adult Services / Aids &
Equipment
£12,000,000.00 01/10/2023 30/09/2028
Page 89 of 214

Page 90

North Lanarkshire and the whole of
Lanarkshire for NHS Lanarkshire requests.
Signs of Safety Signs of Safety is a strengths-based safety-
organised approach to child safeguarding
work which expands the investigation of
risk to encompass strengths and signs of
safety to make an overall judgement of
safety using a scale. It aims to work
collaboratively and in partnership with
families and children to conduct risk
assessments and produce action plans for
increasing safety and reducing risk and
danger by focusing on strengths,
resources and networks that the family
have.  
Education, Families &
Justices/ Social Care
Services
£95,000.00 02/10/2023 01/04/2025 
Table 11b describes of the procurement activity for Contracts under £50,000 undertaken in 2023/24. 
Contractor Contract Overview Service Area /
Procurement
Category
Total Value of
Contract (Excl
VAT)
Contract
Start Date
Contract
End Date 
Commercial
Strategy
Sourcing Route
Durham
University
Project set-up and design: working alongside
professionals to design two approaches to be
tested in the schools, including reflective
workshops to explore Contextual safeguarding
theory and approaches within education
settings.  
Education,
Families &
Justices/ Social
Care Services
£34,808 01/08/2023 31/12/2024 New
Requirement
Proposal for
Funding
Care Solutions The provision of Care at Home services to
support the flow of hospital discharges and
service user reablement.
Adult Services /
Social Care
Services
£15,700 06/03/2023 25/06/2023 New
Requirement
Proposal for
Funding
Page 90 of 214

Page 91

Invercare Services
Ltd
The provision of Care at Home services to
support the flow of hospital discharges and
service user reablement.
Adult Services /
Social Care
Services
£17,628 06/03/2023 25/06/2023 New
Requirement
Proposal for
Funding
JKL The provision of Care at Home services to
support the flow of hospital discharges and
service user reablement.
Adult Services /
Social Care
Services
£14,000 06/03/2023 25/06/2023 New
Requirement
Proposal for
Funding
Keane Premier The provision of Care at Home services to
support the flow of hospital discharges and
service user reablement.
Adult Services /
Social Care
Services
£15,784 06/03/2023 25/06/2023 New
Requirement
Proposal for
Funding
ADL Smart
Platform MILE
Online resource offering information,
professional advice and direct access to
services and support for individuals in North
Lanarkshire. This service allows individuals to
obtain information and/or complete self-
assessments, promoting early prevention and
self-management.
Adult Services /
Social Care
Services
£24,664 01/03/2023 31/07/2023 New
Requirement
Proposal for
Funding
Wise Group Community Payback Order Relational
Mentoring service.
Education,
Families &
Justices/ Social
Care Services
£42,000 01/06/2023 31/03/2024 New
Requirement
Proposal for
Funding
Ten for Zen To help build capacity and with the assistance
from other third sector partner agencies will
provide a collective effort to support Social
Work to deliver vital services. 
Education,
Families &
Justices/ Social
Care Services
£29,250 01/04/2023 31/03/2025 New
Requirement
Proposal for
Funding
Creative Change To provide a unique in person and online
experience that combines anonymity and
creativity in interactive 2-hour sessions
delivered twice weekly in 12 session blocks.
This will include accreditation certificate from
New College Lanarkshire on completion of
programme for each participant.
Education,
Families &
Justices/ Social
Care Services
£49,000 01/04/2023 31/03/2025 New
Requirement
Proposal for
Funding
SACRO Provision of an individual service using a
mentoring approach, which is a way of helping
and supporting individuals with issues they
might be facing both practically and
emotionally.
Education,
Families &
Justices/ Social
Care Services
£38,000 01/06/2023 31/05/2024 New
Requirement
Proposal for
Funding
Page 91 of 214

Page 92

Reeltime Music Provision of the creative arts and sessions in a
studio/workshop to develop skills, create and
produce music.
Education,
Families &
Justices/ Social
Care Services
£6,500 01/06/2023 31/05/2024 New
Requirement
Proposal for
Funding
Women’s Aid -
MARAC
Provision of effective management, co-
ordination and administration of Multi Agency
Risk Assessment Conferences (MARAC), on
behalf of North Lanarkshire Council and North
Lanarkshire Health and Social Care Partnership. 
Adult Services /
Education,
Families &
Justices/ Social
Care Services
£48,624 01/07/2023 30/06/2024 New
Requirement
Proposal for
Funding
Autism Network Provision of specific knowledge, skill,
experience and expertise from a curated
organisation around: 
preventative and \ or anticipatory approaches,
capacity building, developing skills and
knowledge with staff involved in assessment
and planning. influencing and shaping policy
and strategy supporting people and families
where Autism (Autistic people),
neurodivergence and \ or complex need is a
feature- of support requirements. Influencing
and shaping approaches related to supporting
people with complex care needs will
predominantly, although not exclusively be
people identified through the “Coming Home”
*agenda.
Adult Services /
Social Care
Services
£10,000 01/11/2023 31/10/2024 New
Requirement
Proposal for
Funding
Mind of my Own
Ltd
Mind of my own Subscriptions – All in One. Education,
Families &
Justices/ Social
Care Services
£44,088 01/11/2023 31/10/2025 New
Requirement
Proposal for
Funding
Deaf Services
Lanarkshire
Provision of supports to the Deaf community to
reduce inequalities for people with a sensory
impairment accessing supports. 
Adult Services /
Social Care
Services
£10,000 01/04/2023 31/03/2024 New
Requirement
Proposal for
Funding 
Page 92 of 214

Page 93

12.  Ethical Commissioning
Our team responded to a request from the Scottish Government for Local Authorities to participate in
a self-assessment of ethical commissioning to outline how the principles are currently embedded in
commissioning and procurement practice at a local level. The assessment considered what currently
works well, where there might be opportunities for improvement, what standards may be applicable,
and any opportunities or barriers linked to the principles.  The findings from self-assessments have
been summarised and will inform a national implementation plan for ethical commissioning.
The Quality Assurance team are part of an on-going working group being led and facilitated by IRISS to
consider and shape training for procurement and commissioning teams. This working group aims to
take forward the first four objectives within the national implementation plan referenced above.
Commissioning and procurement teams are being asked by the Scottish Government to start the
transition towards a National Care Service. This means working in a way that is grounded by ethical
commissioning principles. 
The Quality Assurance team over the reporting period have participated in the Ethical Commissioning
on line course available at Ethical commissioning in social care | Iriss This course is for:
• Commissioning and procurement staff in public bodies 
• Providers of social care and support: managers and business development teams
• Service managers in social work and social care
• Members of Integrated Joint Boards 
There are 8 ethical commissioning principles in total which include Fair Working Practices and Full
Involvement for People with Lived Experience. The self-assessment referenced above highlighted
strengths around our procurement and commissioning approach being focused on Fair Work Practices. 
The Vision - By 2025, people in Scotland will have a world leading working life where fair work drives
success, wellbeing and prosperity for individuals, businesses, organisations and for society. 
The Fair Work Dimensions
Fair work is work that offers all individuals an effective voice, opportunity, security, fulfilment and
respect.
• It balances the rights and responsibilities of employers and workers.
• It generates benefits for individuals, organisations and society. 
Community Benefits 
During 2023/24 Quality Assurance continued to increase focus on the delivery of community benefits,
following new contract awards and implementation. Our approach means link Senior Officers meet
with contractors to review, promote and encourage new initiatives that offer employment to people
in the local community, youth training and training for people from disadvantaged groups,
traineeships, apprenticeships, and volunteering opportunities.  
Page 93 of 214

Page 94

Scottish Living Wage 
Last year we reported that most contractors had
indicated they were either already accredited as
or were willing to become Scottish Living Wage
employers. This trend continues with 98% of
contractors who deliver advise, direct care &
support are paying the Scottish Living Wage. 
The remaining 4% of contractors provide non-
care related services or are within the cross-
border category whereby the Scottish Living
Wage does not apply. 
Full Involvement of People with Lived
Experience 
Over the reporting period we will work to strengthen our involvement of people with lived experience
in procurement and commissioning processes. The self-assessment we completed highlighted this as
an area we must embed in all aspects of procurement and commissioning rather than pockets of
activity. We will report on how this area develops next year.
13.Adult Support & Protection
The Quality Assurance team have a vital role across social work in supporting commissioned services
to respond in accordance with Adult Support & Protection legislation and North Lanarkshire Council
policies and procedures. Quality Assurance team members also have a role in the identifying of
patterns and themes arising from referral activity and for the analysis of other information sources
which may suggest referrals are required. As the direct links to commissioned services Quality
Assurance promote best practice in relation to Adult Support & Protection.
Over the course of the reporting period the Quality Assurance team has expanded and due to this and
the need for refresher training for existing team members, reflective of the revised Adult Support &
Protection (Scotland) Act 2007 Code of Practice, the Adult Support & Protection Committee facilitated
a training day for the team. The training content was tailored to the role of the Quality Assurance team
and included a section on Large Scale investigations due to this area featuring highly within the Quality
Assurance remit.
The day provided an opportunity for the team to discuss Adult Support & Protection in the context of
the Quality Assurance department policies and procedures to ensure linkage to localities and oversight
of Adult Support & Protection activity within commissioned services. Discussions were able to centre
around the role in Adult Support & Protection for Quality Assurance in terms of provider failures and
establishing root causes for services which may indicate systemic failings. As a result of the training
day and the discussions facilitated, there were various actions agreed to ensure consistency in
approach, on-going learning and to build upon data collated and analysed.
Quality Assurance continue to contribute to on-going monitoring, learning and development forums
such as the Pan Lan ASP task force working group.  This group was established with the aim of
empowering care home managers to have confidence in their decision making around adult support 
2%
98%
Providers Paying Scottish Living Wage
% N/a % Yes
Page 94 of 214

Page 95

and protection. There have been wide ranging discussions about assessing the impact of ASP training
and Quality Assurance took the lead in developing a Competency Framework which will be
completed following participation in training delivered by the Adult Protection Committee. This
framework is for internal and external colleagues and partner organisations. A test of change will
take place over the coming months and an evaluation of whether this approach meets the intended
outcomes will ensue. 
14. Adult Health & Social Care Risk Management  
Quality Assurance have responsibility for the coordinating of the Adult Health & Social Care Risk
Forum, for the facilitating of Adult Health & Social Care quarterly risk forums and for the reporting of
risk to Core. Risk Forums have taken place 3 monthly during the reporting period. All activity takes
place as designed within the Risk Management Corporate Risk Strategy.
The risk champion within Quality Assurance attends Corporate Risk Management Meetings to ensure
appropriate escalation and information sharing.
Over the reporting period there has been focus on maximising attendance at risk forums, having
appropriate membership, building participation and in achieving timely review of risks. Since the
review of risk arrangements has taken place including discussion about roles and responsibilities and
the revisiting of terms of reference attendance has increased significantly as has the enthusiasm of
members. 
A Quality Assurance Risk Management mailbox has been set up for all communications risk related
and there has been an improvement in the timescales for risk assessments being carried out.
Quarterly and annual reports capture this information. Quality Assurance assist with devising any new
risks and for carrying out an induction for any new members to the group.
Education & Families and Justice representatives sit in the Adult Health & Social Care Risk Forum with
risk information being directed to SMT Meetings. Quality Assurance link with Education & Families
Risk Facilitators to establish priorities and effective reporting of risks within the field.
Work in 2024/25 will focus on reframing some risks, supported by the Corporate Risk Team. The Risk
Compliance Audit will also be implemented with a timescale of 6 monthly attached to this. Key findings
will feature in reports to Core/SMT. It is expected that more advanced risk training will also be
organised for risk champions and facilitators over the next reporting period.
15. Service and Contract Review  
Quality Assurance have been reviewing Registered Social Landlord Provision across North Lanarkshire
over the past year. This review had commenced prior to the pandemic however was paused as a result.
The review includes five providers of Sheltered/Very Sheltered/Supported Housing across a total of 12
developments. The purpose of the review is due to legacy funding arrangements and contracts having
expired. Other local authorities have either carried out the review or have plans to do so imminently.
The initial part of the review has included meeting with providers and gathering a range of data to
assist in understanding the outcomes being achieved for people, how the different elements of service
provision are being accessed and consideration of where there appears to be duplication of services.
From the data it appeared that where people were assessed as requiring care and support individual
packages of care were being provided by external providers including North Lanarkshire Council
homecare services. The housing support services funded by North Lanarkshire Council and paid to
Registered Social Landlords appeared to be utilised for social support and for in the event of an
emergency situations. With access to emergency support available through the providers in house
Page 95 of 214

Page 96

alarm service and also North Lanarkshire Council community alarms, as well as a range of sophisticated
technology a recommendation has been made to withdraw housing support funding. 
North Lanarkshire Council fund a wealth of community supports which are accessible to people living
in specialised housing and the Quality Assurance team have been promoting this, to ensure supports
are unique to people’s wants and needs. 
Engagement sessions have commenced across the developments to consider the views of people and
their families. Advocacy representatives have also attended to ensure that those who need support
for their voice to be heard are empowered to do so. 
The outcome of the review will be communicated over the course of 2024.25.
16. Safer Staffing 
Quality Assurance have been liaising with the Care Inspectorate, other local authorities, commissioned
services and internal colleagues to prepare for the implementation of the Health and Care (Staffing)
(Scotland) Act 2019 which will be enacted on 1st April 2024.  Preparations have included attendance at
Care Inspectorate webinars, keeping abreast of all safer staffing developments and arranging for the
Care Inspectorate to carry out an awareness raising session for the Quality Assurance team due to the
responsibilities within the act when commissioning services. A further online session was arranged and
open to all within North Lanarkshire Council. 
Between November 2023 and February 2024, Quality Assurance staff took part in a test which was
arranged by the Care Inspectorate on behalf of the Scottish Government. North Lanarkshire were one
of ten authorities involved in this. The purpose was to gather information around how prepared
commissioned services were for the implementation of the act and any risks that could be identified
due to the implementation of the act. Several methods were implemented to enable feedback to be
captured and this included the establishing of a safer staffing working group, the devising of a
questionnaire and analysis of this thereafter and having as an agenda item for monitoring visits, team
meetings and provider forum meetings.   
The working group above has enabled the sharing of best practice and discussion around fears and
apprehensions. Feedback has been that the group benefited from this approach and as learning will
be on-going after enactment the group will run for the first year of implementation. This will provide
a forum to measure impact of the legislation. 
There is a requirement for local authorities to produce an annual report for safer staffing and
this will be the role of Quality Assurance. To enable the on-going compliance of the
requirements of local authorities when commissioning services, work has been carried out to
modify our contract management framework and associated terms and conditions.
17. Care Home Governance & Assurance
A review of the enhanced clinical and care oversight arrangements for care homes took place during
this reporting period. The purpose of this was to ensure continued support for care homes supporting
adults and older people by building upon the learning from the arrangements implemented during the
COVID pandemic. It has been widely recognised that although we are post pandemic significant
achievements have been made in maximising opportunities for partnership working and the outcome
of the review captures the ethos of collaboration, sector expertise, access to healthcare and supporting
workforce development. 
Page 96 of 214

Page 97

The functions of the Care Home Assurance and Support Board are: -
• Ensure assurance and support to CH sector continues in context of Excellence in Care,
including IPC direct Support and embedding of the National Infection Prevention and Control
manual
• Oversee whole system support to care homes to improve health and wellbeing of adults living
in care homes through implementation of My Health, My Care, My Home – healthcare
framework for adults living in care homes and Health and Social Care Standards in Scotland
• Ensure collaborative improvement model is utilised in all developments with care homes
• Ensure systems and processes are in place to share intelligence between agencies to identify
and allow support to be provided to care homes at risk.
• Ensure systems and processes are in place to provide immediate response to serious concerns
to mitigate risks
• Monitor overall capacity of sector – identify risks and mitigate where possible
• Ensure contingency plans are in place for the sector and regularly updated. 
The Care Home Assurance and Support Board also has two subgroups established. These are the Care
Home Governance Group and Care Home Healthcare Framework Implementation Group. It is
envisaged that following an initial gap analysis of the Healthcare Framework these two subgroups will
merge with implementation of the Healthcare Framework continuing to be monitored and evaluated. 
Collaborative Group - The Care Home Governance Group and the Healthcare Framework
implementation Group have been aiming for attendance and participation from care home
managers/family members however to date representation has been low. To ensure two-way
feedback Quality Assurance implemented a Collaborative Group with the aims being to ensure the
voice of care home representatives are heard, to discuss the recommendations- and actions identified
in the gap analysis and to feed information to and from the wider groups. The group also offers peer
support and a shared learning experience and there is representation from health colleagues and
Scottish Care. 
Care Home Provider Forum – Quality Assurance have reestablished Care Home Provider Forums which
were stood down due to the pandemic. An initial meeting took place with care home managers to
consider what format would work for them. It was agreed that an informal setting which could be in
person or via teams, with key speakers attending and the availability of peer support would progress.
Forums take place quarterly.
18. Complaints 
Quality Assurance retains an overview role in terms of complaints made about Social Work service
provision. Regular quarterly reports on complaints activity are reported through our governance
structures.   
The annual summary and analysis of complaints received over the period 2023/24 is attached as
appendix 1. 
19. Duty of Candour 
Duty of Candour is a statutory duty on Scottish organisations providing health and social care. The
responsibility is to remain open and honest when something goes wrong, that is not related to the
course of the condition for which the person is receiving care. An annual report capturing Duty of 
Candour activity is a requirement of the Council and the report for 2023/24 is attached as appendix
2. 
Page 97 of 214

Page 98

20. Quality Assurance Planned Developments 
This report has covered Quality Assurance activity undertaken during the period 1 April 2023 to 31
March 2024 and highlights progress made in key activities noted in the last reporting period. Several
developments outlined below are in progress or planned for the period 2024/25 and we will provide
updates in future reports. 
• Social Work Self Evaluation 
• Establishment of ASW Governance Subgroup
• Safer Staffing Annual Report
• On-going development of collaborative working groups – Safer Staffing, Care Home
Governance & Contract Monitoring
• Developments aligning with the principles of ethical commissioning 
• On-going social work induction & development planning/Social Work Policies & Procedures
Review Group
• Duty of Candour Reporting Processes
• Awareness raising sessions delivered to Localities
• Conclusion of RSL Review
• Reframing of risks & 6 monthly compliance audits of risk register
• Care Opinion Newsletter
• Evaluation of In-House Monitoring Framework/Roll out In House Monitoring Framework
• Continued evaluation of ASP practices across QA and commissioned services
• Launch of the Engagement and Participation Strategy
• Introduce modified contract monitoring processes
• Compile and report on quarterly performance reports
• Involvement in B2B Enabling Approach
• Implement learning in relation to CSWO Report  
Page 98 of 214

Page 99

Socia Work Complaints
Annual Report                   
2023-2024 
Annual Complaints Report 2023-2024
Social Work [Adults and Education, Families & Justice] 
Appendix 2 
Page 99 of 214

Page 100

Introduction
This report provides an overview of Social Work’s performance in terms of handling complaints
received between 1 April 2023 and 31 March 2024 and covers Adults and Education, Families & Justice.  
This report describes how complaints have been managed by social work services, details the number
and nature of complaints received during the year and demonstrates our commitment to learning and
improvement.    
Complaint Process
We always aim to provide the highest possible quality of service across our communities and are
committed to ensuring accountability and transparency.   We recognise there are times when we get
things wrong and fail to meet the expectations of those who use our services.  We welcome feedback
as it provides information that helps us to learn from complaints and shape and improve the way
services are delivered. Complaints are viewed as a positive communication tool and are actively
encouraged. 
As per the Scottish Public Services Ombudsman [SPSO] definition, we regard a complaint as any
expression of dissatisfaction, by one or more members of the public, about our action or lack of action,
or about the standard of service provided by us or on our behalf.   
Anyone can make a complaint, either verbally or in writing, face to-face, by phone, letter or email. 
People are directed and encouraged to use the North Lanarkshire Council online portal to make a
complaint but retain the right to use any of the aforesaid options. 
A two-stage statutory social work complaints process was introduced on 1 April 2017, which
harmonised complaint handling processes across all council services.   The process is as follows:
• Stage one – ‘frontline resolution’: we will always try to resolve complaints quickly, within five
working days, and in exceptional circumstances extend for a further five days. 
• Stage two – ‘investigation’: if people remain dissatisfied with our stage one response, they
can escalate their complaint to stage two. Complaints that are complex or need detailed
investigation from the outset can be looked at immediately at stage two. These complaints will
be acknowledged within three working days and a written response provided within twenty
working days; this can be extended in exceptional circumstances. 
Following completion of the complaints process, if the person remains dissatisfied, they can ask the
SPSO to consider their complaint further. We always advise of this entitlement and provide contact
details.  
Complaint activity
There remained a residual effect of the Covid 19 pandemic in terms of the numbers of complaints
received in 2023-2024.  However, complaint activity has been slowly returning to pre-covid levels.   
Overall, 205 complaints were received in the reporting period, a decrease of 16 [7.5%] from 2022-
2023.  A breakdown of locality complaints are noted below:   
Page 100 of 214

Page 101

Education & Families
96 complaints were received in relation to Education & Families services in the reporting period, 96
received last year, so no change.   The chart below is a summary of locality complaint activity for
Education, Families and Justice services.   
Adult Social Work Services
109 complaints were received for adult services for the period, 140 received last year, a decrease of
31 [25%]. The chart below is a summary of locality complaint activity for Adult Social Work Services. 
Performance Indicators
The Complaints Standard Authority developed a suite of four mandatory performance indicators in
association with the Local Authority Complaint Handlers Network on which we are represented. 
These indicators [undernoted] are a valuable source of information as they help to identify recurring
13
14
10
12
15
17
15
Airdrie
Bellshill
Coatbridge
Cumbernauld
Motherwell
Wishaw
HQ
Education & Families
20
6
19
16
11
23
14
Airdrie
Bellshill
Coatbridge
Cumbernauld
Motherwell
Wishaw
HQ
Adult Services
Page 101 of 214

Page 102

or underlying issues, derive/drive learning from complaints and highlight potential areas for
improvement.     
• Indicator One: the total number of complaints received.
• Indicator Two: the number and percentage of complaints at each stage that were closed in
full within the set timescales of five and 20 working days.
• Indicator Three: the average time in working days for a full response to complaints at each
stage.
• Indicator Four: the outcome of complaints at each stage. 
Education and Families – Performance Information
Compliance with target statutory timeframes to complete complaint.
Undernoted graphic depicts the aderhance to statutory timeframes.  At Stage 1, 19% failed to meet
response times, 51% did meet response times, 30% required an extention and were completed
within 10 working days.  
Stage 2, 27% failed to meet statutory timeframes, 56% 
Cause of Complaints
The cause of complaint is not always recorded, for those complaints that have a recorded cause, the
detail is noted below: 
Page 102 of 214

Page 103

Cause of Complaints [Stage 1] 
Cause of Complaints [Stage 2] 
Complaint Outcome       
Page 103 of 214

Page 104

Adult Social Work Services – Performance Information
Compliance with target statutory timeframes to complete complaint
Undernoted graphic depicts the aderhance to statutory timeframes.  At Stage 1, 15% failed to meet
response times, 51% did meet response times, 34% required an extention.
Stage 2, 16% failed to meet statutory timeframes, 79% met timeframes,  5% required an extenstion.           
Cause of Complaints
As noted with the Education & Families data, the cause of complaint is not always recorded. For
those complaints that have a recorded cause, the detail is noted below:
Cause of Complaints
Stage 1   
Page 104 of 214

Page 105

Stage 2
Complaint Outcome   
Comments and compliments.
Across social work, ten compliments were made 2023-2024 – seven were positive, three were
neutral.     5 other comments were logged – all of which were neutral in sentiment.          
Learning from Complaints
The learning from all social work complaints this year have highlighted: 
• The importance of good communication. 
• The need to ensuring that those who use our services and their carers have appropriate
information.  
• The need for robust forward planning.
Page 105 of 214

Page 106

• The need to ensure that equipment is clean and fully maintained prior to supply.
• The need to improving information and advice for those who need to contact and seek support
from social work services. 
• That people have the right to use their Self-directed Support (SDS) individual budgets as
creatively as necessary to reach their agreed outcomes.
• The need to park vehicles with courtesy.
• Necessity to dispose of PPE and other personal waste responsibly. 
Outcomes are often specific to the complaint, but when there are organisational learning points that
influence policy or procedure, we need to ensure these are acted upon.   Individual learning is dealt
with directly with the complainant and through supervision, and more general issues are managed
through supervision with team members and reminders at team meetings. 
32% of all social work complaints recorded did not record any learning outcomes, whilst 41% were
attributed to communication/staff attitude as the principal cause of complaints.   27% related to other
issues such as courteous parking, failure to provide services, quality of service, provision of OT
equipment.
We recognise the importance of learning from complaints and acknowledge that having a learning
outcome recorded is an area that requires attention.  We understand that complaints help
organisations learn more about the experiences of people who use their services, and that complaints
can be helpful to enable us to work in a better way.  
At present, learning from complaints is a non-mandatory performance indicator.  However, the
Scottish Public Services Ombudsman are interested in the systemic changes that are made following
complaints. Going forward, we will work directly with our central and locality teams to ensure better
recording and learning from complaints is embedded in practice to ensure quality services are
delivered.
Scottish Public Services Ombudsman
The SPSO considered eight complaints throughout 2023-2024 six of which they decided not to follow
up, one was withdrawn by the complainant.  In another complaint, the SPSO recommended that we
compensate a complainant for loss of kinship care allowance.   A payment was suggested and accepted
by the complainant.   
83
66
24
16
16
Learning outcomes
Communicaton
No learning outcome
Service improvement
Improve process
Miscellaneous
Page 106 of 214

Page 107

Child Friendly Complaints Procedure
The SPSO are introducing a new Child Friendly Complaints Procedure, which we expect will be launched
in July 2024.   This procedure will ensure that children’s rights under the United Nations on the Rights
of the Child [UNCRC] are met through a child-centred complaint process.  Their aim is to co-design and
implement a public sector complaints service that meets children’s rights and needs.  They are working
in co-operation with children, young people, public bodies and wider stakeholders. Initially, it was
envisaged that the new procedure would be fully implemented by 1 April 2024.  However, following
feedback from engagement and testing work, a more targeted pilot was undertaken by Aberdeen
Health and Social Care Partnership. The aim of the test site was to test the new approach in practical
settings, both to ensure it results in the right outcomes for children, and that it is efficient, practical,
and workable for the public sector bodies managing the process. Their experiences have influenced
the shape and scope of the updated procedures. 
Full guidance on the new process should be made available by summer 2024.
Care Opinion
Care Opinion is a non-profit organisation, web-based feedback platform funded mainly through
subscriptions from health and care organisations.  At present, 500 health and social care organisations
use Care Opinion across the UK. 
People submit stories to share their experiences of health and social care services. These can be both
positive and negative, and are moderated by Care Opinion staff, and quickly forwarded to the relevant
area of service who can respond directly to the story.    
We recognise the importance of feedback; it is considered integral to quality improvement.   For staff,
it gives an opportunity to see the system and the service provided through the person’s eyes.   
• 310 stories have been submitted through Care Opinion by people of North Lanarkshire. 
• 239 of these stories have been shared in the year April 2023-March 2024.
• Most stories received a response from the service within 24 hours.
To further support the use of Care Opinion as a vehicle to promote feedback on services, our revised
Contract Management Framework requires all contracted providers, through their quarterly
monitoring return, to report on their use and promotion of Care Opinion as a method of seeking
feedback.   We are also expanding the service tree to incorporate commissioned organisations if they
wish to be included within the subscription. 
Training
Training on the Dynamics system, where complaints are recorded, is offered as required.  The licence
allocation system has recently been reviewed, and licence permissions granted only to management
support team members and to system administrators.   Rationalisation of licence holders has increased
opportunities to have closer collaboration and training across all services.  Colleagues in Chief
Executive’s office lead on training on system issues, and Quality Assurance Senior Officers lead on
complaint handling training.   
Quality Assurance 
Quality Assurance senior officers provide training and support to social work managers and teams in
relation to the complaint handling process.  A suite of letter templates are available, which provide
guidance on model answers and best practice when engaging with complainants.  Complaints are often
Page 107 of 214

Page 108

routed directly through the Quality Assurance officer who acknowledges receipt and assigns
complaints to the relevant team manager.  Guidance on response times and content is provided.  
A review of how a complaint was handled was undertaken by a Quality Assurance officer whose
findings were reported to the Care and Clinical Governance Group.  
Complaints that relate to both health and social work/social care services are routed through the
relevant lead organisations complaints process, but there is an integrated approach to resolution and
any joint learning outcomes are shared.  
Conclusion
The principal cause of complaints continues to identify poor staff communication, staff attitudes and
quality of service.  This is further reflected within the learning outcomes, which indicate the need to
improve communication, practice and approach to those using social work services.    
As a service we are committed to improving learning from complaints, which is also one of the key
performance indicators that are reportable to the SPSO.  We will, over the course of 2024-2025 place
further emphasis on identifying and applying learning from complaints, recording learning outcomes
and evidencing subsequent improvements.
We will also emphasise the need to ensure that all complaints are dealt with in the identified
timeframes, with clear communication of outcomes.   Although 100% of complaints that were sent
directly to social work were acknowledged by the due dates, only 58% overall were completed within
statutory timeframes.   Complexity of issues, new processes, staffing, IT systems and very tight time
frames for resolution were the contributory factors in failure to complete all complaints within time. 
Improvement in these areas is expected in 2024-2025. 
Further actions – 2024-2025
Several key actions have been identified to strength our approach when dealing with complaints
including using the learning to improve the quality of experience for those who use our services.  Many
are continuing or legacy commitments made in former years and remain valid objectives.  The actions
are:
1. We will audit all complaints over the course of 2024 -2025 to ensure that the procedures are
understood and followed.  Legacy action that is on-going. 
2. We aspire to ensure that logging actions and learning from complaints is done consistently to
support the improvement of services that support people across our communities. 
3. We will develop a programme of reflective learning sessions across teams - Complaint activity
and learning remain an agenda item in team meetings and links across services and localities
are maintained with Quality Assurance Senior Officer who will review complaint activity as
required.   Learning sessions were delivered to home support staff across all localities.  
4. We will continue to promote Care Opinion as one of the key mechanisms for engaging with
members of the public and to generate meaningful feedback.   Further resources have been
deployed to assist with this activity – a one-page newsletter/precis of Care Opinion will be
drafted and circulated to all social work staff to support further usage and promotion of Care
Opinion. 
5. We will provide system training to all members of the management support teams who now
have responsibility for logging and tracking complaints.   This action has been hampered 
Page 108 of 214

Page 109

6. We will offer complaint handling training sessions on at least a quarterly basis as a refresher
session, or for training for new staff.   Training sessions are offered on an ad hoc basis, and as
required by individual teams.  
7. A further legacy action from 2022-2023 is the roll out and implementation of Child Friendly
Complaints Handling Procedures.  The SPSO have now indicated that Child Friendly Complaint
Handling will not be a separate procedure per se, but practice guidance to ensure that the
rights of children and young people, conferred by the UNCRC, are protected   
Page 109 of 214

Page 110

Duty of Candour Report: 2023-2024 
Appendix 3 
Page 110 of 214

Page 111

Introduction 
North Lanarkshire Council (NLC) recognises that when adverse events occur during the provision of
treatment or care, openness and transparency is fundamental. 
The Health (Tobacco, Nicotine etc. and Care) (Scotland) Act 2016 was implemented on 1st April 2018
placing an organisational duty (Duty of Candour) on health, care, and social work services to be open
and honest with people in their care. 
The Duty of Candour arrangements which we have implemented reflect the Scottish Government’s
commitment to place people at the heart of health and social care services in Scotland. When harm
occurs the focus must be on personal contact with those affected; support, and a process of review
and action that is meaningful and informed by the principles of learning and continuous improvement. 
The overall purpose of this duty is to ensure organisations are open, honest, and supportive when
there is an unexpected or unintended incident resulting in death or harm as defined in the Act. All
health and social care services in Scotland have a Duty of Candour, a legal requirement which means
that when things go wrong and mistakes happen, the people affected understand what has happened,
receive an apology, and that organisations learn how to improve for the future. 
A part of this duty is that Health and Social Care services publish an annual report about the Duty of
Candour in our services. This report describes how our services have met Duty of Candour
requirements between 1 April 2023 and 31 March 2024. 
When must the Duty of Candour procedure be activated? 
Organisations must activate the Duty of Candour procedure as soon as reasonably practicable after
becoming aware that: 
• an unintended or unexpected incident occurred in the provision of the health, care or social work
service provided by the organisation as the responsible person. 
• in the reasonable opinion of a registered health professional not involved in the incident: 
(a) that incident appears to have resulted in or could result in any of the outcomes mentioned below.
(b) that outcome relates directly to the incident rather than to the natural course of the person’s
illness or underlying condition.
It is important to note that where the Duty of Candour procedure start date is later than one month
after the date on which the incident occurred, an explanation of the reason for this has to be provided
to the relevant person. 
The relevant outcomes are as follows: 
(a) The death of the person. 
(b) Permanent lessening of bodily, sensory, motor, physiologic or intellectual functions (including
removal of the wrong limb or organ or brain damage) (“severe harm”). 
(c) Harm, which is not severe harm, but which results in one or more of the following criteria: 
• an increase in the person’s treatment. 
• changes to the structure of the person’s body. 
• the shortening of the life expectancy of the person. 
• an impairment of the sensory, motor or intellectual functions of the person which has lasted, or is
likely to last, for a continuous period of at least 28 days. 
• the person experiencing pain or psychological harm which has been, or is likely to be, experienced
by the person for a continuous period of at least 28 days. 
Page 111 of 214

Page 112

Or where:
The person requires treatment by a registered health professional in order to prevent: 
• the death of the person. 
• any injury to the person which, if left untreated, would lead to one or more of the outcomes
mentioned above 
Information about policies and procedures 
All staff who are employed in the sector should be aware that all instances that necessitate
implementation of Duty of Candour must immediately be reported. In such instances, organisations
must then take the appropriate action, ensuring relevant bodies [depending on the sector] such as
Social Work and \ or Care Inspectorate are notified of the event. Where an incident occurs that triggers
the Duty of Candour, organisations have responsibility for ensuring that the Duty of Candour procedure
is followed. 
Training sessions on Duty of Candour were delivered to 60 home support managers and staff
throughout 2023-2034. We will continue to provide support and training when necessary to minimise
the impact on the organisation and the vulnerable people that we strive to support. 
Information on Duty of Candour and reportable incidents is described in detail within Appendix 1. 
All North Lanarkshire Council Social Work In-house services are required to adhere to Duty of Candour
reporting requirements. Initial notifications are made when reporting accidents and incidents in
accordance with North Lanarkshire Council internal CIRUS system. 
How many incidents happened to which the Duty of Candour applies? 
Over this reporting period, there were no Duty of Candour related incidents reported by North
Lanarkshire Council care and support services. 
Conclusions 
The requirements for Duty of Candour are such that the number of relatable incidents are generally
low nationally.  Duty of Candour related knowledge and reporting requirements will continue to be a
statutory reporting requirement if or when, they do occur. 
The actions described below are intended to ensure that there is an ongoing focus on Duty of Candour. 
Actions 
If in the future, should any incidents occur that invoke Duty of Candour proceedings, there will be a
review process to identify any lessons learned and the result of any such review will be shared with
the relevant person/persons. 
Awareness raising sessions regarding Duty of Candour will be undertaken with commissioned services
over the year. 
Page 112 of 214

Page 113

Appendix 1 – Definition of Harm and appropriate level of response 
Grading of
Harm
Definition of Harm  Level of Response
No harm,
incident
prevented
Any service user safety incident that had the
potential to cause harm but was prevented.
These incidents are outside of the scope
of the Duty of Candour. Social work
professionals may however feel it is
appropriate to inform the person
involved if it is in their best interest.
No harm,
incident not
prevented
Any service user safety incident that occurred
but no harm was caused to the person
involved.
These incidents are outside of the scope
of the Duty of Candour policy. Being
open in a discussion between staff
involved and the service user and their
family is usually undertaken locally.
Low Harm Any service user safety incident that led to the
extra observation or minor treatment such as
first aid or additional medication for the person
involved.
These incidents are outside of the scope
of the Duty of Candour policy. Being
open in a discussion between staff
involved and the service user and their
family is usually undertaken locally.
Moderate
Harm
A level of harm that is not permanent but 
has led to a moderate increase in 
treatment or prolonged psychological harm 
of more than 28 days. 
For example, a return to theatre, an unplanned
readmission to hospital, 
unexpected admission to critical care, a prolonge
hospital stay or additional out service user visits.
Duty of Candour is a statutory
requirement. Notification should be
given to the person affected or their
representative in person including an
explanation of the incident, the process
for investigation and an apology. This will
be followed up in writing and on
conclusion of the investigation the
findings and outcome will be available to
the service user of their representative.
Serious Harm Any service user safety incident that has
resulted in permanent harm that is directly
related to the incident and not the natural
course of an illness or the underlying condition
of the person affected. Examples of severe
harm are permanent lessening of bodily
functions, sensory, motor, physiological or
intellectual function, removal of the wrong
organ or limb or brain damage.
Duty of Candour is a statutory
requirement – see above.
Death Any service user safety incident that directly
resulted in the death of a person and is not
related to their illness or underlying condition.
Duty of Candour is a statutory
requirement – see above.
Page 113 of 214

Page 114

Page 114 of 214

Page 115

North Lanarkshire Council
Report 
Adult Care and Social Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    AG/QA Date 19/11/24 
Annual Report of the Chief Social Work Officer 2023/24 
From  Alison Gordon, Chief Officer (Chief Social Work Officer - Children, Families,
Justice and Integrated Services - Education & Families)  
E-mail GordonAl@northlan.gov.uk Telephone 01698 332001 
1. Background 
1.1 The requirement that each local authority appoint a professionally qualified Chief Social 
Executive Summary 
In line with Scottish Government guidance the Chief Social Work Officer (CSWO) is
required to provide an annual report. This report provides an overview of social work
service delivery in North Lanarkshire for the period April 2023 to March 2024 and cover the
following areas: 
• Governance and accountability arrangements, including partnership working.
• Service Quality and Performance, including service developments.
• Resources
• Workforce
• Future Priorities 
The North Lanarkshire CSWO Report 2023/24 is attached as an appendix to this report. 
The report also reflects social work’s contribution to the Programme of Work underpinning
the Plan for North Lanarkshire. 
Recommendations
It is recommended that the Adult Care and Social Work Committee: 
(1) Approve the report.
(2)  Note that approval of the report will also be sought through the Education, Children,
and Families Committee. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work All Programmes of Work
Item 7
Page 115 of 214

Page 116

Work Officer is contained in Section 45 of the Local government (Scotland) Act 1994.
Statutory Guidance on the role of the Chief Social Work Officer was updated in 2016, 
to reflect the impact of Health and Social Care integration, extending the responsibilities
of the role to provide advice to the Integration Joint Board (IJB). In addition to providing
advice both to the Local Authority and IJB in relation to the discharge of statutory social
work functions the role continues to carry key responsibilities for professional
leadership, values, and standards both for directly provided and commissioned
services. 
1.2 Social Work Services in North Lanarkshire continue to play a lead role in supporting
and safeguarding our communities. Adult Social Work and Social Care Services are
delivered through Health and Social Care North Lanarkshire (HSCNL) whilst Children,
Family and Justice Services are delivered through the Council’s Education and
Families Service. 
1.3 The CSWO role requires to be undertaken by one designated individual, delegation of
responsibilities is permitted where required by the scale of business. In North
Lanarkshire this means that the Chief Officer Adult Social Work Services, routinely
exercises delegated responsibilities for decision-making and professional standards
within adult services as well as providing support and cover with respect to the wider
functions of the CSWO role. 
1.4 The Annual Chief Social Work Report is intended to provide a key overview of social
work service delivery and performance. The Office of the Chief Social Work Advisor
(OCSWA) also produces a national report each year which draws on key themes and
messages from CSWO reports across Scotland. 
2. Report 
2.1 Social Work in North Lanarkshire employs around 2,800 staff and in collaboration with
commissioned services and third sector partners provides to around 30,000 individuals
and families at any one time.  Social work also makes a key contribution to wider
partnership and community activity. 
2.2 As illustrated within the report partnership working is fundamental to social work at
every level and a key aspect of the CSWO role involves developing and sustaining
partnership working and relationships across a range of organisations and structures.
In addition to the specific responsibilities of the CSWO to the Council and HSCNL, the
CSWO holds a key leadership role within several local partnerships as well as
contributing to the wider national social work community. Social Work also plays a key
role within the Council’s Programme of Work in particular, but not limited to, work being
progressed under the Resilient People programme.  Equally many of the aspirations of
the wider programme including the core commitment to inclusive growth are critical to
those in our communities most likely to require social work support. 
2.3 Whilst the delivery of core statutory responsibilities including for public protection
remain a significant part of social work service delivery, social work also plays a key
role in early support and both primary and secondary prevention as highlighted within
the report.  Income maximisation and tackling poverty also continue to be key strands
in the delivery of social work and social care in North Lanarkshire. These have become
increasingly integrated into day-to-day practice and service delivery and have a strong
fit with the core values of social work.  Equally important and threaded through the
activity reflected within this year’s report is a commitment to relationship based and
trauma-informed practice. 
Page 116 of 214

Page 117

2.4 Demand for social work services has continued to increase across all social work care
groups continuing a trend which has seen this increase beyond pre-pandemic levels
however as reflected within the report the service has continued to maintain a strong
‘balance of care’ meaning that a high proportion of those receiving support receive this
within the context of their own homes and communities.  There has also over recent
years been an increased focus on the area of ‘transitions’ to ensure those receiving
support do not face a ‘cliff edge’ as they move between child and adult life or between
services or statutory and voluntary supports. Whilst further work is still required in these
areas progress in this is evidenced in the steadily growing number of young people
supported in continuing care and in those in receipt of voluntary throughcare from
justice services. 
2.5 External scrutiny of social work services is undertaken primarily through the Care
Inspectorate and its partner agencies.  In addition to ongoing inspections of regulated
services a Joint Inspection of Services for Children and Young People at Risk of harm
in North Lanarkshire took place between April and October 2023 evaluating the impact
of services on children and young people as Very Good and identifying a number of
key strengths including in respective of collaborative leadership and the strong
relational and trauma informed approaches which supported staff form trusting
relationships with children, young people and their families.   
2.6 Staff commitment and resilience has continued to be strong although as reflected in
Section 5 of the report there remain staffing pressures in key areas including with
respect to home support services, the mental health officer workforce, administrative
support and other social care roles. A range of initiatives to support staff recruitment
and retention against a challenging backdrop is outlined within the report and a number
of these including the updating and re-evaluation of main grade social worker and
occupational therapy roles have contributed to a reduction in vacancies in this critical
area of the workforce. 
2.7 Both despite and in response to pressures the service has continued to innovate
including in the use of digital technology and has also continued to strengthen the
involvement of those with lived experience in planning. 
2.8 Looking forward the report reflects on future challenges including the likely increase in
financial pressures, in part arising from the ending of temporary funding streams. but
also identifies opportunities to build on successful areas of practice, and strong
partnerships to continue to work holistically and in particular to improve early support
to strengthen and empower individuals, families and communities. 
3. Measures of success 
3.1  N/A – Annual Report to meet reporting requirement. A range of outcome measures, 
KPIs and specific service standards are applied across social work services. 
4. Supporting documentation  
4.1 Appendix 1: Annual Report of the Chief Social Work Officer 2023/24 
Alison Gordon
Chief Social Work Officer 
Page 117 of 214

Page 118

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
No direct impact though the report provides key evidence that the effective delivery
of social work services supports the Council in their delivery of Fairer Scotland 
Duty. As this is a retrospective report no EQIA is required 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
All recruitment is in line with our workforce plans and governed through the
appropriate routes. 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
All statutory requirements are met through the role and function of the CSWO. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐
Page 118 of 214

Page 119

If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Whilst digital developments are a feature of service improvement and delivery
within social work all relevant changes reflected within the report have already
been considered through relevant governance processes. 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Key risks highlighted within the report are incorporated in relevant risk registers.
The report itself is part of a wider framework of reporting which supports the
scrutiny of social work services and therefore aids the Council in its duties with 
respect to the delivery of key statutory functions. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Where relevant issues are considered in planning for individual’s support, 
Page 119 of 214

Page 120

the service will also continue to consider the benefits of enhanced arrangement for
groups of service users. An example of this is within our Restorative Justice
Service which has both a veteran’s group and has also previously contributed
through unpaid work to linked community projects. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
No direct impact though the report provides key evidence that the effective delivery
of social work services supports the Council duty. As this is a retrospective report
no CRWIA is required 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 120 of 214

Page 121

1 
Chief Social Work Officer 
Annual Report
2023 - 2024 
Page 121 of 214

Page 122

2 
ANNUAL REPORT BY CHIEF SOCIAL WORK OFFICER: NORTH LANARKSHIRE 2023-2024 ............................................... 4
THE CHIEF SOCIAL WORK OFFICER FUNCTION .................................................................................. 4
ANNUAL REPORT ................................................................................................................................ 4
1. GOVERNANCE AND ACCOUNTABILITY ARRANGEMENTS ............................................................................................ 6
1.1 NORTH LANARKSHIRE COUNCIL AND NORTH LANARKSHIRE PARTNERSHIP ............................. 6
1.2 HEALTH AND SOCIAL CARE NORTH LANARKSHIRE ...................................................................... 8
1.3 SUPPORT, CARE, PRACTICE AND STAFF GOVERNANCE ARRANGEMENTS .................................. 8
1.4 CARE HOME ASSURANCE ............................................................................................................. 9
1.5 ENGAGEMENT WITH THE PEOPLE WHO USE SUPPORT SERVICES AND THE COMMUNITY AND VOLUNTARY
SECTOR .............................................................................................................................................. 10
2. SERVICE DEVELOPMENT, QUALITY AND PERFORMANCE .......................................................................................... 11
2.1 PERFORMANCE AND IMPACT MEASUREMENT ......................................................................... 11
2.2 SUPPORT TO UNPAID CARERS .................................................................................................... 12
2.3 JUSTICE SOCIAL WORK SERVICES ............................................................................................... 12
2.3.1 COMMUNITY PAYBACK ORDER - INCLUDING UNPAID WORK ...................................................................... 13
2.3.2 OTHER ACTIVITY ............................................................................................................................................ 13
2.3.3 DIVERSION FROM PROSECUTION ................................................................................................................. 14
2.3.4 OFFENCE FOCUSED WORK ............................................................................................................................ 14
2.3.5 MOVING FORWARD TO CHANGE (MF2C) ..................................................................................................... 15
2.3.6 WOMEN’S COMMUNITY JUSTICE SERVICE (WCJS) AND BAIL SUPERVISION ............................................... 15
2.3.7 NEW DEVELOPMENTS:  ENHANCEMENT OF VOLUNTARY THROUGHCARE AND DRUG AND ALCOHOL
SOLUTIONS COURT ................................................................................................................................................. 15
2.3.8 THROUGHCARE: ARREST REFERRAL .............................................................................................................. 16
2.4 CHILDREN AND FAMILIES SOCIAL WORK SERVICES ................................................................... 16
2.4.1 THE BALANCE OF CARE .................................................................................................................................. 17
2.4.2 MOVING ON: SUPPORTING CARE EXPERIENCED YOUNG PEOPLE ............................................................... 18
2.4.3 A LOVING HOME: ADOPTION, FOSTERING & KINSHIP CARE ....................................................................... 19
2.4.4 INTENSIVE FAMILY SUPPORT ......................................................................................................................... 21
2.4.5 YOUNG PEOPLE IN CONFLICT WITH THE LAW .............................................................................................. 23
2.4.6 CHILDREN WITH ADDITIONAL SUPPORT NEEDS........................................................................................... 24
2.5 ADULT SOCIAL WORK SERVICES ................................................................................................. 24
2.6 EARLY AND PREVENTATIVE INTERVENTIONS – RIGHT SUPPORT, RIGHT TIME .......................... 25
2.6.1 GETTING IT RIGHT FOR EVERYONE (GIRFE) .................................................................................................. 25
2.6.2 MAKING LIFE EASIER ..................................................................................................................................... 25
2.6.3 ASSISTIVE TECHNOLOGY TEAM ..................................................................................................................... 26
2.6.4 COMMUNITY ALARMS .................................................................................................................................. 26
2.6.5 EQUIPMENT & ADAPTATION SERVICE (EAS) ................................................................................................. 27
Page 122 of 214

Page 123

3 
2.6.6 INTEGRATED DAY SERVICES (IDS) .................................................................................................................. 27
2.6.7 HOME ASSESSMENT TEAM (HAT) ................................................................................................................. 27
2.6.8 HOME SUPPORT SERVICE .............................................................................................................................. 28
2.6.9 TRANSFORMATIONAL SELF-DIRECTED SUPPORT (SDS) AGENDA & INDIVIDUAL BUDGETS ....................... 29
2.6.10 COMMUNITY LIVING CHANGE FUND/COMING HOME  ....................................................... 29
2.7 DIGITAL SYSTEMS TRANSFORMATION ............................................................................................................. 30
3. STATUTORY INTERVENTIONS ...................................................................................................................................... 31
3.1 MENTAL HEALTH OFFICERS SERVICE AND ADULTS WITH INCAPACITY ACT (SCOTLAND) 2000 . 31
3.2 MENTAL HEALTH (CARE AND TREATMENT) ACT 2003 AND MENTAL HEALTH (SCOTLAND ACT 2015) 32
3.3 DEVELOPMENT OF MHO SERVICE TO MEET NEEDS .................................................................. 33
3.4 APPROPRIATE ADULT SERVICES ................................................................................................. 33
3.5 PUBLIC PROTECTION .................................................................................................................. 34
3.5.1 ADULT SUPPORT AND PROTECTION VESTIGATIONS/CASE CONFERENCES AND STATUTORY ORDERS/
FUNCTIONS ............................................................................................................................................................. 34
3.5.2 MAPPA (MULTI-AGENCY PUBLIC PROTECTION ARRANGEMENTS) ............................................................... 35
3.5.3 CHILD PROTECTION INCLUDING CONTEXTUAL SAFEGUARDING ................................................................. 36
3.5.4 GENDER BASED VIOLENCE ............................................................................................................................ 39
4. RESOURCES ................................................................................................................................................................. 40
4.1 FINANCIAL MODELLING FOR SERVICE DELIVERY ....................................................................... 41
5. WORKFORCE ............................................................................................................................................................... 41
5.1 WORKFORCE PLANNING ............................................................................................................ 41
5.2 SOCIAL WORK RECRUITMENT AND RETENTION........................................................................ 42
5.3 SOCIAL CARE ............................................................................................................................... 43
5.4 OTHER RECRUITMENT AND RETENTION CHALLENGES ............................................................. 44
5.5 CARE ACADEMY .......................................................................................................................... 44
5.6 WORKFORCE DEVELOPMENT AND STAFF SUPPORT ................................................................. 44
5.7 ASSESSMENT CENTRE AND REGISTRATION ................................................................................ 45
5.8 POST GRADUATE OPPORTUNITIES ............................................................................................. 45
5.9 SOCIAL WORK DEGREE PATHWAY WITH THE OPEN UNIVERSITY .............................................. 45
5.10 STUDENT SOCIAL WORK HUB .................................................................................................. 45
5.11 NEWLY QUALIFIED SOCIAL WORK PROGRAMME .................................................................... 46
5.12 OTHER KEY TRAINING AND DEVELOPMENT ACTIVITIES ......................................................... 46
5.13 TRAUMA INFORMED PRACTICE ............................................................................................... 47
5.14 REVISION OF SUPERVISION POLICY ......................................................................................... 47
5.15 SUPPORT FOR STAFF WELLBEING ............................................................................................. 48
6. LOOKING FORWARD – PRIORITIES FOR 2024-2025 AND BEYOND ............................................................................ 48 
Page 123 of 214

Page 124

4 
ANNUAL REPORT BY CHIEF SOCIAL WORK OFFICER: NORTH LANARKSHIRE 2023-2024 
THE CHIEF SOCIAL WORK OFFICER FUNCTION 
Every local authority must appoint a professionally qualified Chief Social Work Officer (CSWO) as reflected in Section
46 of the Local Government (Scotland) Act 1994. 
The CSWO provides professional leadership, accountability, and governance, for the delivery of social work and social
care services, including commissioned services. 
The CWSO also provides advice on social work service delivery and on related issues to the local authority Chief
Executive, Elected Members, and the Integrated Joint Board (IJB) promoting understanding of the range of social work
and social care services, and the complexities involved in delivering statutory responsibilities which require both
consideration of need and the management of risk and liberties. The then Scottish Office specifically recognized that
the need for the CSWO role was driven by “the particular responsibilities which fall on social services in that they affect
personal lives, individual rights and liberties to an extent that other local authority services do not.” (Circular:
SWSG2/1995 May 1995). 
Operationally the CSWO also has a direct remit for decisions on specific statutory matters including in relation to secure
accommodation, adoption and welfare guardianship as illustrated below. 
A further aspect of the CSWO role is to inform the delivery of wider services which support or impact on social welfare. 
The CSWO role within North Lanarkshire is held by the Chief Officer, Children, Families, Justice, and Integrated Services
however the CSWO is supported by the Chief Officer, Adult Social Work Services who holds delegated responsibilities
with respect to adult social work and social care, deputises in other areas as required and works alongside the CSWO
in relation to the other functions of the role. 
ANNUAL REPORT 
In line with Scottish Government guidance, the CSWO is required to provide an annual report. This report provides an
overview of social work service delivery in North Lanarkshire for the period April 2023 to March 2024 and covers the
following areas:
• Governance and accountability arrangements, including partnership working and statutory functions
• Service Quality and Performance, including key service improvement activity and challenges impacting on
service delivery
• Resources
• Workforce Issues, including workforce planning, training, and development
• Future Priorities – Social work landscape and priorities looking forward to 2024/25 
Social Work Services continue to play a critical role in supporting communities in North Lanarkshire and in meeting
both national and local priorities to improve outcomes and empower those individuals and families who may face
exclusion or a range of adversities. Demand challenges driven by societal factors including the legacy of the pandemic
and the cost-of-living crisis, demographic change and health inequalities have continued to impact on social work
services over the past year alongside the challenging financial context for the public sector and whilst recruitment
challenges have eased in some areas of the service they continue to present substantial challenges in others. This is
reflected within the report along with our achievements as staff across the service continue to work with resilience
and commitment to achieve the best possible outcomes for those we support. 
Page 124 of 214

Page 125

5 
I would like to record my thanks and pay tribute to all staff involved in the delivery of social work services in North
Lanarkshire for their work over the past year I would also like to thank all internal and external partners, carers,
families, and communities who have supported us in our work. 
Alison Gordon
Chief Social Work Officer  
Page 125 of 214

Page 126

6 
1. GOVERNANCE AND ACCOUNTABILITY ARRANGEMENTS 
Adult Social Work and Social Care Services are delivered through University Health and Social Care North Lanarkshire
(UHSCNL) whilst Children, Family and Justice Services are delivered through the Council’s Education and Families
Service. Primary reporting and governance arrangements for Adult Social Work are through the Integrated Joint Board
(IJB) and its Performance, Finance and Audit Sub-Committee but with local authority oversight and scrutiny also
maintained through them Council’s Adult Care and Social Work Committee. Reporting and governance of Children and
Justice Social Work Services is in turn primarily exercised through the Council’s Education, Children and Families
Committee with reporting also to other council committee’s including Audit and Scrutiny Panel where relevant on
specific issues. 
Social Work Chief Officers are part of the Council’s Corporate Management Team whilst a number a number of joint
arrangements support governance, service delivery and practice alignment across all social work care groups, including
regular Social Work Solutions (Business) Meetings, the Social Work Leadership Team, and a Social Work Workforce
Group. 
Social Work in North Lanarkshire directly employs around 2,800 staff and in collaboration with commissioned services
and third Sector partners, we are involved in providing support to around 30,000 individuals and families at any one
time, in addition playing a key role in wider partnership and community planning activity. 
Partnership working at local level remains fundamental to social work and a key aspect of the CSWO role involves
developing and sustaining partnership working and relationships across a range of organisations and structures. In
addition to the responsibilities of the CSWO to the Council and UHSCNL, the CSWO holds a key leadership role within
several local partnerships, as well as contributing to the wider national social work community, as illustrated below: 
1.1 NORTH LANARKSHIRE COUNCIL AND NORTH LANARKSHIRE PARTNERSHIP 
The Plan for North Lanarkshire | North Lanarkshire Council sets out the shared priorities of NLC and partners and has
a focus on inclusive growth and tackling inequalities.
The plan focuses on:
• improving economic opportunities and outcomes
• supporting all children and young people to realise their full potential
• improving the health and wellbeing of communities
• enhancing participation, capacity and empowerment across our communities and improving North
Lanarkshire’s resource base 
Social Work continues to play a fundamental role in working towards these aims, notably around supporting children
and young people to achieve their potential, improving community health and well-being and in supporting and
facilitating engagement and participation. 
The plan is supported by a five-year Programme of Work, approved in March 2023.
The Programme of Work has seven priorities for delivery:
• Transforming Places – to deliver transformational change across town centres and local communities.
• Invest in North Lanarkshire – Faster delivery of outcomes and investment.
• Sustainable Futures - Focus commitments towards Net Zero Carbon and climate resilience and the
associated energy solutions and investments required to make it a reality.
• Resilient People - Deliver whole family support locally, when families need it, in a way that addresses
the impacts of poverty and reduces inequality.
• Brighter Futures - Support and improve educational attainment, employment
opportunities, entrepreneurship, and volunteering.
Page 126 of 214

Page 127

7 
• Digital North Lanarkshire - Develop a skilled digital workforce, promote an innovative, sustainable culture and
be the Digital Leader for a transformed North Lanarkshire.
• One Service - Ensure services are delivered, in a streamlined, efficient, and supportive model, with the
overall vision of inclusive growth and prosperity for all. 
Whilst all services contribute and are supported by change activity across these seven priorities, social work’s role is
particularly significant within the Resilient People and Brighter Future strands of the programme which have key
interdependencies in terms of delivery models with elements of the Digital and One Service programmes. This is
reflected in the participation of senior social work managers in the programme boards and the CSWO’s role as SRO for
Resilient People. 
Connections made across the wider range of corporate work programmes, continue to make a meaningful difference
to people who use social work services. Examples include employability services, homelessness prevention and
community wealth and capacity building with key examples of progress detailed within the relevant sections of this
report. 
Across the service a key focus remains to promote resilience, encourage and support preventative planning and
anticipatory approaches and minimise the risk of crisis and the involvement of the Community and Voluntary Sector
continues to be an essential strand of our wider approach, in promoting self-help, independence and resilience. 
The North Lanarkshire Council Equality Strategy 2019 – 2024, sets out key objectives for success with all council
services committed to knowing, understanding, and involving our communities and demonstrating leadership in
equalities and human rights. There is recognition that the poverty, disadvantage, and inequalities that exist for some
people in North Lanarkshire can be further exacerbated due to specific characteristics. Clearly this is a key area for
social work and during this period this has also aligned closely with our work to embed trauma informed practice and
systems and the strengthening focus around the United Nations Convention on the Rights of the Child (UNCRC)   
Adult Services have developed a Service Equality Action Plan which details how the service will meet the objectives
identified in the Equality Strategy within Adult Health and Social Care. The plan includes equality actions in relation to
the implementation of a new social work information system and the refresh of the Engagement and Participation
Strategy. A programme of training in relation to good practice in Equality Impact Assessments has been initiated with
around 40 senior staff having participated to date whilst the CSWO has taken on the role of Executive Race Champion
for the Council. 
North Lanarkshire Children’s Services Partnership (CSP) is the structure through which partners provide governance,
strategic planning, direction, and delivery of shared priorities for children’s services in North Lanarkshire. The Children’s
Service Partnership Board membership includes Elected Members, UHSCNL/NHS Board representation and
representation from young people through links with North Lanarkshire Youth Council, and Champion’s Board links.
There are developed links and cross over with other strategic partnerships such as NL Child Protection Committee and
the Tackling Poverty Strategy. 
The North Lanarkshire Children’s Services Plan is refreshed every three years and supported through annual reporting:
Annual Report 2023-24  Social Work has a key role in all the CSP priorities. The CSWO is lead officer for the CSP and
chairs the Improving Children’s Services Group which has oversight of the work of task groups delivering on the
priorities in the Children’s Services Plan that are organised under the foundation of The Promise, Voice, Family, Care
Scaffolding and People. 
The Community Justice Partnership, currently also chaired by the CSWO has responsibility for the multi-agency
oversight of Community Justice in North Lanarkshire. 
Page 127 of 214

Page 128

8 
The partnership has continued to benefit from strong collaboration with a wide range of partners including
employability services and the NL Alcohol and Drug Partnership.  This has supported continued developments in a
range of areas including diversion, throughcare, bail supervision and our local Arrest Referral Pilot initiated in April
2023.  Commitment from partners has also ensured a holistic response to the needs, examples being ‘keep well’ clinics
for justice service users and a dedicated employability worker Routes to Work.    A partnership steering group has also
been stood up to support Early Release. 
NL Community Justice Annual Report 2022-23 and our new CJOIP:  Community Justice Outcome Improvement Plan
2023 to 2028  was informed by significant engagement including with those with lived experience and a Strategic Needs
Assessment and sets the framework for our ongoing activity in this area. 
North Lanarkshire Partnership (NLP) brings together the major public sector agencies in the area along with Voluntary
Action North Lanarkshire (VANL) the third sector interface in the area. NLP operates as the overarching framework for
partnership working and the priorities for delivery across the partnership are included in The Plan for North
Lanarkshire. 
The nine Community Boards continue to support community leadership, involvement, and capacity building, with local
outcome and improvement plans (LOIP) guiding this work. 
Social work services support these local partnership structures. The CSWO continues to have the role of Community
Co-ordinator for one of the local boards and the Chief Officer Adult Social Work and Senior Managers for Quality
Assurance and Strategy & Performance provide links to the UHSCPNL and its strategic commissioning activity across all
Community Boards. Senior Social Work Managers also participate in area-based teams and the sub-groups which
support the delivery of the LOIPs (Local Outcome Improvement Plans). 
1.2 HEALTH AND SOCIAL CARE NORTH LANARKSHIRE 
UHSCNL adopted its new Strategic Commissioning Plan 2023-26 from April 2023, setting out key priorities for the next
three years with the aim of ensuring that people are robustly supported to live in their own homes and lead
independent lives in their communities. 
The plan was developed through a collaborative process with people who use Health and Social Care services, partners,
the public, and partnership staff. Key priorities include: 
• Do the right thing first time
• Increased focus on prevention, early intervention and tackling inequalities by working with communities and
people
• Develop and support a workforce for the future
• Improve mental health and wellbeing
• Support people through a whole family approach 
Under each priority area, an agreed set of short- and medium-term goals has been developed underpinned by the
Programme of Work which sets out in detail the programmes to be progressed. These are updated on an annual basis
to ensure we are able to respond to any new or emerging issues. The plan will be implemented over the next three
years, with ongoing monitoring to ensure that services continue to meet the needs and goals of local people. 
The Annual Performance Report for 2023-24 which will be published later in the year, and this will give further details
and achievements of the partnership. 
1.3 SUPPORT, CARE, PRACTICE AND STAFF GOVERNANCE ARRANGEMENTS 
Page 128 of 214

Page 129

9 
Coherence in practice and staff governance within social work are maintained through a variety of processes and key
forums. In addition, the HSCP’s Support Care and Clinical Governance Committee (SCCGC) has met quarterly over the
reporting period, currently chaired by the HSCP Medical Director but with the rotational chairing arrangement also
involving the CSWO/Chief Officer Adult Social Work. Adult Social Work Governance meetings included a robust
programme of assurance and improvement for Adult Social Work Services and feed into the SCCGC framework. 
Over the 24/25 a review of the current framework will be undertaken by the professional and operational managers
supported by our Quality Assurance team. A programme of work to support assurance, performance and improvement
in the service delivery is planned. There is a commitment to ensure that practitioners and managers are supported
with linked assurance activity which will include. 
• Introduction of self-evaluation for each of the teams
• Audit of key processes including supervision
• Feedback from individuals and carers experience
• Feedback from staff
• Monitoring of regulated services and regulated workforce
• Staff/ individuals and carers safety
• Review of complaints and compliments
• 6 monthly reports on learning and development
• Planned programme of review current policies and procedures  
Our In-House Monitoring Framework was approved, and a test of change has been in progress over the reporting
period. A full evaluation is pending and, following refinements, will be rolled out across our adults and children’s
services. The Quality Assurance team have also prioritised the review of our contract monitoring processes to take
account of multiple reporting requirements for commissioned services whilst information governance, complaints and
Duty of Candour activity also continues to be overseen by our Quality Assurance team with key learning and reflections
taken forward. 
This work is reflected in the Quality Assurance Annual Report ADD LINK whilst work over the coming months will further
expand on the streamlining and connection of activity to date. 
1.4 CARE HOME ASSURANCE 
A review of the enhanced clinical and care oversight arrangements for care homes took place during this reporting
period. The purpose of this was to ensure continued support for care homes supporting adults and older people and
improvements in care and outcomes by building upon the learning from the arrangements implemented during the
COVID pandemic.  
It has been widely recognised that although we are post pandemic, significant achievements have been made in
maximising opportunities for partnership working and the outcome of the review captures the ethos of collaboration,
sector expertise, access to healthcare and support for workforce development.  
The functions of the refreshed Care Home Assurance and Support Board are to: - 
• Ensure assurance and support to care home sector continues in the context of Excellence in Care, including
Infection Prevention and Control (IPC), direct support and the embedding of the national IPC manual.
• Oversee whole system support to care homes to improve the health and wellbeing of adults living in these
environments, through implementation of My Health, My Care, My Home – the healthcare framework for
adults living in care homes, and Health and Social Care Standards in Scotland
Page 129 of 214

Page 130

10 
• Ensure that a collaborative improvement model is utilised in all developments with care homes
• Ensure systems and processes are in place to share intelligence between agencies to identify and allow support
to be provided to care homes at risk.
• Ensure systems and processes are in place to provide immediate response to serious concerns to mitigate risks
• Monitor overall capacity of the sector – identify risks and mitigate where possible
• Ensure contingency plans are in place for the sector and regularly updated.  
Two subgroups, the Care Home Governance Group and Care Home Healthcare Framework Implementation Group have
also been established. It is envisaged that following an initial gap analysis of the Healthcare Framework these two
subgroups will merge with implementation of the Healthcare Framework continuing to be monitored and evaluated.  
1.5 ENGAGEMENT WITH THE PEOPLE WHO USE SUPPORT SERVICES AND THE COMMUNITY AND VOLUNTARY
SECTOR 
Engagement and Participation
There has been considerable progress in enhancing participation, capacity, and empowerment across our communities,
in line with Ambition Statement 19, in the Plan for North Lanarkshire - Improve engagement with communities and
develop their capacity to help themselves. This also a priority the UHSCNL Strategic Commissioning Plan and is critical
to ensuring: 
• We involve people in the decisions that affect their wellbeing.
• Improvement comes from feedback on the experiences of services and supports.
• Our services and supports continue to be based on what matters to people.
• We have a continued focus on person centred approaches to embed the wider approach to Getting it Right for
Everyone (GIRFE). 
During 2023-24 there was an increased focus on these areas has sought to ensure that the voices of supported people,
carers and communities were strengthened. 
The diagram above depicts the three principal areas of investment that sought to:
• Improve communication and increase connections.
• Increase awareness of what matters to people
• Increase capacity for early intervention and prevention. 
Page 130 of 214

Page 131

11 
UHSCNL Engagement and Participation Strategy Refresh 2024-2027
The Engagement and Participation Strategy has been refreshed to cover 2024-27. The approach to the refresh has
engaged stakeholders, representatives of community-based organisations, supported people, carers and communities
and representatives from UHSCNL staff. 
Strengthening the voice of supported people and unpaid carers.
There have been significant developments to strengthen the voice of supported people through the awarding of a
contract, following a tender process, to a consortium bid, headed by North Lanarkshire Disability Forum, alongside
Voice of Experience and Lanarkshire Links increasing capacity to include those we need to work harder to reach, for
example, people from minority ethnic communities, people from the LGBTQI+ communities and those in more rural
communities, including through the recruitment of an Equalities Information Worker in North Lanarkshire Carers
Together. This Equalities post augments a similar post that was already in place with Lanarkshire Carers. 
Extensive engagement and participation activity was also undertaken to inform the North Lanarkshire Carers’ Strategy
2024-2027 with carer feedback has influenced and shaped developments described elsewhere in this work. 
Within Children’s Services the Voice Task Group supporting the work of the partnership has been strengthened with
young people also increasingly involved in planning and commissioning, including having a direct role in the tender for
a specific counselling service for care experienced young people and more broadly in decision-making around
allocation of funds for community mental health and wellbeing supports. Over two thousand families also participated
in a survey which has informed the shaping of whole family supports. 
In Justice Services two development workers with lived experience have been employed and have supported
consultation activity with those involved with the service including the development of a digital questionnaire which
has supported more routine gathering of feedback. 
2. SERVICE DEVELOPMENT, QUALITY AND PERFORMANCE 
2.1 PERFORMANCE AND IMPACT MEASUREMENT  
Our formal reporting is presented for a variety of audiences, reflecting the scheme of integration and delegation of
services to the North Lanarkshire Integrated Joint Board (IJB) and the governance of services within several partnership
arrangements. As reflected above there are mature governance frameworks for the Local Authority, the Health & Social
Care Partnership, and the other established partnerships, including the North Lanarkshire Alcohol and Drug Partnership
and the North Lanarkshire Community Justice Partnership (NLCJP). Performance reporting is presented to the various
boards, committees, and groups of these organisations on a cyclical basis, covering the key performance indicators for
the relevant services and areas of work. 
Indicators are in place for core aspects of service, such as access, operational performance, workforce, quality, and
outcomes, ensuring that we both monitor and demonstrate how we have met the needs of the community, produced
positive outcomes for the supported people and that the work represents best value for the Local Authority. Critically
in addition to quantitative data a variety of methods are used to measure impact, outcomes and how people
experience our service as reflected throughout this report. 
In addition to these internal arrangements, performance and quality is both monitored and regulated by several
external bodies, including the Scottish Government, the Scottish Social Services Council, and the Care Inspectorate. 
All Social Work services provide validated performance and demographic data to the Scottish Government and the
various agencies who support Social Work development in Scotland. This data supports the creation of national
Page 131 of 214

Page 132

12 
indicator sets, such as the Local Government Benchmarking Framework and the Integration Indicators. North
Lanarkshire provides annual returns for several national datasets, which can then be used for benchmarking purposes. 
2.2 SUPPORT TO UNPAID CARERS 
Unpaid carers continue to provide the vast majority of support to people who need it, across North Lanarkshire.
Estimates vary as to the number of unpaid carers in our area, but we believe there could be as many as 50,000 or so
unpaid carers, with about 13,000 of these being known to services and the Community and Voluntary Sector (CVS). 
We have a robust carer support infrastructure in place, with three commissioned carer focused organisations:
• North Lanarkshire Carers Together (NLCT)
• Lanarkshire Carers
• Action for Children Young Carers Project 
All of whom provide a wide range of carer focused support or information. There is also a broader range of other CVS
organisations with a direct, or indirect, role in supporting carers. These, and many other carer focused organisations
are part of a wider Carer Support Network (CSN), where caring related topics and issues of common interest can be
raised, discussed and actions taken to improve carer experiences. 
Alongside ongoing carer support, our focus during 2023-24 was engagement with carers (to augment ongoing day to
day carer engagement) to help inform and develop the North Lanarkshire Carer Strategy for 2024-27. Engagement
activity, facilitated by the commissioned carer organisations and the wider CSN, meant that a wide range of carers
helped to inform and shape the new strategy; offering feedback relating to a range of topics of interest to carers around
what was working well, not so well, and suggestions for improvement. 
There was recognition through this work, that many carers experienced disappointment or frustration – citing not
being listened to, or having to tell their story multiple times, experiencing an inconsistent approach, or poor outcomes.
Our intention is to use such instances to inform and drive improvement, through what is, a carer led and carer informed
Carer Strategy, to be launched in May 2024. 
Conversely, there was also a wide range of examples that demonstrated that when carer support is done well,
outcomes can be very positive. Such was the wealth of information provided, that alongside the strategy itself,
consideration has been given to publication of some of the positive stories that we heard- to help promote awareness
of preventative and anticipatory approaches leading to good outcomes, imaginative and creative use of carer budgets,
or the enabling role that assistive technology can play.   
2.3 JUSTICE SOCIAL WORK SERVICES 
Justice Social Work Services have seen demand relating to core statutory responsibilities increase as the justice system
continues to address the backlog of COVID impacts with, for example, a 69% increase in hours of unpaid work
requirements imposed over the past two years.  Alongside this service delivery has been shaped by key priorities set
out in both our new Community Justice Outcome and Improvement Plan (2023-2028) and the Scottish Government’s
Vision for Justice published in February 2022, and its supporting strategy published in June 2022, with an increased
focus on areas such as diversion from prosecution and bail supervision.   The service continues to promote a holistic
approach to working with people with convictions to ensure that in addition to robust risk management, support is
offered to address the range of issues, such as health and employment barriers, which can inhibit rehabilitation and
inclusion and in turn better lives and safer communities. 
Page 132 of 214

Page 133

13 
2.3.1 COMMUNITY PAYBACK ORDER - INCLUDING UNPAID WORK 
The communities of North Lanarkshire have benefited from 92,624 hours of unpaid work delivered by the Restorative
Justice Team. This constitutes an increase in activity of just over 20% since the last reporting year. Of note, service
activity in this area has risen by 54% over the last 2 years. Demand continues to grow and during the period of this
report 133,941 hours were imposed by Courts in relation to Unpaid Work and Other Activity, a 69% increase in the
hours imposed in this regard over the last 2 years. 
The following paragraphs provide an overview of some unpaid work activities. More detail on specific activity is
referenced in the Community Payback Annual Report. 
The bike recycling workshop refurbished bikes which are donated by individuals or have been discarded in local
recycling centres. The bikes are repaired to a gold standard and are distributed to local community groups, schools and
individuals. This helps to maximise opportunities for better health and wellbeing and provides greater transportation
access. Service users within the workshop also undertake bike repair for individuals who are unable to afford the cost
of this. Due to the success of this workshop, a mobile bike recycling trailer has been purchased and this enables the
provision of bike maintenance and repair within the local communities. In total 8,746 hours of unpaid work were
completed through this initiative in 2023/24. This represents a significant increase in activity over the last 2 years when
1,075 hours were completed in 2021/2022, and 6,213 hours were completed in 2022/2023. 
The woodwork workshop teaches joinery skills which enables bespoke items to be made from reclaimed wood pallets
which were destined for landfill. Partnership working with family learning centres, nurseries, schools and communities
have allowed for unpaid work service users to be involved in the construction of outdoor classrooms, and play
equipment in the form of trucks, trains, cares. This approach has helped to promote outdoor play for children
throughout our community. 
Squad placements have benefitted the local communities through activities such as landscaping. In total 54 squad have
been completed within North Lanarkshire. These range from one to two-day pieces of work to larger projects with a
duration of four to six months. 
The home improvement workshop provides opportunities for services users to gain experience in decorating, painting,
and plastering. Once the individuals are proficient in these disciplines, they utilise the skills on projects within the local
community. 
In partnership with local housing colleagues and school staff the Restorative Justice unpaid work team has also
facilitated learning events at our community allotments in Townhead, Clydeside, and in Wishaw. These events enable
children and people in the local community to sow seeds and learn about different growing techniques. Participants
can take away some of the produce and can be invited back later in the year to experience the harvest taking place.
This project has allowed for a creative teaching space which helps individuals to develop new skills which they can
contribute to the benefit of the local community. 
2.3.2 OTHER ACTIVITY 
The availability of Scottish Government Covid-19 recovery funding has enabled the continued commissioning of Third
Sector colleagues to assist in the delivery of ‘other activity’ programmes. Co-production of this aspect of Community
Payback Orders includes collaboration between Justice Services and a variety of organisations including the Wise
Group, Creative Change Collective, SACRO, Reeltime Music and Ten for Zen. 
Page 133 of 214

Page 134

14 
In addition to the above commissioned third sector organisations, Justice Services provides a range of opportunities
for service users to engage in Other Activity. The e-learning workbook resource pack provides blended digital learning
which can be completed in partnership with staff. The Centre for Clinical Interventions as well as NHS Mental Health
Foundation Trust resources are also utilised to complete workbooks in the following: 
• Anxiety, Self-Care, Social Anxiety, Bereavement, PTSD, Self-harm, Sleeping Problems, Depression and Low
Mood, Obsessions/ Compulsions and Panic.
• Alcohol and You, Cannabis and You, Cocaine, Gambling, Anger Management and Procrastination.
• Goal Setting, Self-Development, Writing applications and Interview techniques. 
2.3.3 DIVERSION FROM PROSECUTION 
In partnership with Police Scotland, a bespoke Diversion from Prosecution awareness training session was delivered by
Justice Services in December 2023. This session was delivered at Jackton Police College to Inspectors in Lanarkshire.
Following this event, it was identified that Police Sergeants would also benefit from this training. Consequently, a
further five training sessions were delivered in March 2024. It is envisaged that this awareness raising will result in a
further increase in people being diverted from the justice system through Diversion from Prosecution. 
Within the reporting period of 2023–2024, 242 individuals were diverted from formal justice systems by being involved
in the Diversion from Prosecution Scheme. This is a 38.29% increase from the previous year’s figures of 175. 
2.3.4 OFFENCE FOCUSED WORK 
Offence focused intervention continues to be central to the delivery of Justice Social Work services, regardless of
whether that engagement is mandated through Community Payback Order, Statutory Licence, Structured Deferment
or Diversion from Prosecution. This is delivered through a trauma informed approach, considering wellbeing and
individual responsivity and supporting others to recognise the links between wellbeing and risk whilst person-centred
case management plans are informed by LSCMI, other relevant accredited risk assessment tools, the service user’s
views, and professional judgement. 
Offence focussed interventions remain a priority area of work and a crucial element of supervision, particularly for
those convicted of sexual offending, physical violence, and intimate partner violence. Such interventions are delivered
by social work case managers as well as pathways into a dedicated programmes which offer trauma informed
therapeutic interventions to individuals convicted of domestic abuse and sexual harm. 
Increasing accessibility to offence focussed interventions is also a priority area in our Prison Based Social Work (PBSW)
team based in HMP Shotts.  During this period PBSW staff successfully cleared the Programme Case Management
Board waiting list of 102 individuals in the establishment who did not have a risk assessment and were awaiting access
to an intervention programme. This also enabled the Risk Management Team to make informed decisions about
individuals who could be considered for progression. Through collaboration with Scottish Prison Service (SPS) staff, a
streamlined system has been implemented to ensure that all individuals are risk assessed within the first five months
of entry into HMP Shotts and ahead of their first Integrated Case Management Meeting (ICM). 
In addition to offence related work Justice Social Work support individuals in areas such as education, employment,
health, leisure, housing and financial needs.  The Justice Outcome Star is employed to identify the service user's priority
areas of need, and to support measure progress and outcomes. 
Page 134 of 214

Page 135

15 
2.3.5 MOVING FORWARD TO CHANGE (MF2C) 
NLC Justice Services have been one of the pilot areas for the new Scottish Government MF2C programme which has
been designed to supersede the MFMC (Moving Forward Making Changes) programme. 
This programme is an intensive cognitive behavioural therapy intervention for men over the age of 18 who have
committed sexual offences. The programme seeks to assist participants in addressing their offending and reduce their
risk of reoffending as part of a Court Order or release Licence. The new programme has been adapted to incorporate
up to date literature, can be delivered in Prison based establishments as well as the community. The Justice Programme
Service is currently maintaining delivery of the MF:MC programme to relevant service users, whilst also delivering the
pilot MF2C programme. In time the service will transition to increasing MF2C delivery while reducing and phasing out
MF:MC delivery. 
The pilot has been delivered on a 2:1 basis with a small group of service users and with relative success in relation to
low reoffending rates. The pilot has been considered as part of the wider evaluation by Scottish Government and a
decision reached that full implementation of the new programme will begin throughout 2024-25. 
2.3.6 WOMEN’S COMMUNITY JUSTICE SERVICE (WCJS) AND BAIL SUPERVISION 
The Women’s Community Justice Service (WCJS) was established in 2014 in response to the Commission on Women
Offenders by Dame Elish Angiolini. The service works with women who are involved in the justice system. The majority
of the service users are subject to Community Payback Orders with requirements of supervision and/or unpaid work.
Additionally, the service work with women subject to parole board licences, those subject to bail supervision and also
alternatives to prosecution. 
A key development in the WCJS, has been the recruitment of a Justice Support Worker to support women who are
made subject to Bail Supervision. Proactive engagement has taken place with the Pan-Lanarkshire Court Social Work
Team to agree a pathway for early identification of these cases and to ensure timeous communication with the WCJS.
This supports the national vision for Justice to reduce the number of women who experience custody.
A partnership approach is adopted to plan, intervene/support and review service users' needs and risks. This assists to
build on strengths and work towards achieving their goals and aspirations. With regards to unpaid work the female
specific service allows for female only unpaid work activities. 
Most of the women using the service have experienced trauma and much of the work involves supporting them with
their emotional and mental health needs. Multi agency partnership working with Children and Families, Shine Women’s
Mentoring Service, Domestic Abuse and Addiction Services is crucial to support this service user group. Additionally,
the Women’s Community Justice Service have commissioned a new intervention resource entitled ‘Managing Emotions
and Relationships’. This approach enables staff to utilise Cognitive Behaviour Therapy to facilitate structured
conversations that help Women to develop better coping strategies. 
2.3.7 NEW DEVELOPMENTS:  ENHANCEMENT OF VOLUNTARY THROUGHCARE AND DRUG AND ALCOHOL
SOLUTIONS COURT 
Voluntary Throughcare
Through the local Community Justice Partnership employability subgroup, additional funding was secured to extend
the offer of our current voluntary throughcare service beyond HMP Addiewell. As a result, a Justice Support Worker
was recruited and the Bridges and Beyond initiative now offers person centred outreach support to individuals serving
a short-term sentence in various prisons across central Scotland. 
Page 135 of 214

Page 136

16 
The Bridges and Beyond service has supported 53 service users in 2023-24. The service aims to remove barriers to
employment and resettlement for those serving short term prison sentences is crucial in helping to reintegrate
individuals into the community and reduce the prison population. 
Drug and Alcohol Solutions Court
In September 2023, NLC Justice Services recruited two Justice Support Workers funded by the North Lanarkshire Drug
& Alcohol Partnership (NLADP) to support the introduction of a Lanarkshire wide Drug & Alcohol Solutions Court. This
has been instigated as a 12-month test for change. The initiative is based at Hamilton Sherrif Court and adopts a public
health approach to working with people who are impacted by drug and, or alcohol, and who are in conflict with the
law. The age range for eligibility is 35-55, and consideration is being given to extending this to people aged between
21-55. 
Despite the early stages of the test for change, outcome star data indicates that all service users currently engaged in
Structured Deferred Sentence through the new test for change have reported progress across multiple life domains.
Service user feedback indicates that those individuals who have previously breached more stringent orders such as
Drug Treatment and Testing Order, find the flexibility and assertive outreach dimension to the support as well as the
trauma informed approach within court more effective. 
2.3.8 THROUGHCARE: ARREST REFERRAL 
An Arrest Referral test for change has continued to operate in North Lanarkshire’s Police Custody Suites. Importantly
this service is delivered by people with lived experience of the justice system offering an opportunity for partnership
working with individual being held in custody with a focus on early intervention, direct and practical support, and a
pathway for referral to appropriate agencies. This test for change is being funded by the NLADP and will be
independently reviewed. 
2.4 CHILDREN AND FAMILIES SOCIAL WORK SERVICES 
Children and families social work, working closely with our partners, has continued over this period to focus on
embedding a culture that enables practice that is rights-based, trauma informed and built on relationships. To promote
this, we developed further training in Safe and Together where domestic abuse is a concern and continued to
implement the Contextual Safeguarding approach where young people are at risk in the community. Agreement was
also secured to begin the implementation of Signs of Safety. Taken together, these complimentary approaches support
staff practise in ways that build relationships with children, young people, and their families in need of support and
protection by building on strengths. Crucially these approaches also form a key part of our commitment to keep The
Promise by finding creative ways of supporting children remain cared for and loved in their families, reducing the need
for crisis support or alternative care. We were therefore pleased that the Joint Inspection of Services for Children at
risk of harm found our impact on children was Very Good as a result of children’s experience of nurturing relationships
to keep them safe (see section 2.4.3 for more detail).
Page 136 of 214

Page 137

17 
2.4.1 THE BALANCE OF CARE 
Our balance of care data outlined in the table shows that overall, the number of children in care has remained stable
from 2020-2024. However, this needs to be seen in the context of a 20% increase in children referred to the service
over the same period and within this a significant 44% increase in child protection referrals and the higher number of
Unaccompanied Asylum Seeking Children now supported (55 and increasing) having arrived through the now
mandatory National Transfer Scheme (NTS) or presenting directly from the community. In this context the
maintenance of a stable position reflects the use of strengths-based approaches outlined above, finding solutions for
children through family group decision making and a strategic approach to investment in family support through funds
such as the Community Mental Health and Wellbeing Framework and Whole Family Wellbeing Fund. Positively, we
have also continued to reduce our use of out of authority foster placements which means more children have
remained in North Lanarkshire close to their families and communities. 
Placement type
Number as
of 31
March
2020
Number as
of 31
March
2021
Number as
of 31
March
2022
Number as
of 31
March
2023
Number
as of 31
March
2024
Foster NLC 100 112 94 112 109
Foster Care (Independent) 67 61 53 51 47
Home Supervision 298 227 188 205 196
Formal Kinship Care 355 321 307 325 358
Informal Kinship Care 153 170 183 191 180
Residential (NLC) 28 27 27 31 32
Residential (Independent) 13 11 11 9 7
Secure* 0 2 6 7 5
Continuing Care 45 53 73 74 77 
*number of young people spending time in any secure accommodation during full year. 
Nothwithstanding this, there are some significant pressures. The numbers of young people in need of our residential
care or secure care has increased. In large part this is due to an increase in young people being at risk of violence in
the community and/or criminal and sexual expliotation. These risks to young people compounded pressures and
difficutlies facing families. Similar trends are seen elswhere in the UK (Jay, 2024). Our children’s houses therefore
continued to look after young people with a high level of complex needs. Following a 59% reduction in missing episodes
Page 137 of 214

Page 138

18 
over the previous 3 years, the number increased in 2023-24 with young people often facing strong ‘pull factors’ linked
to criminal exploitation and peer relationships. We continued to promote and invest in approaches such as Contextual
Safeguarding (see section 3.6.3), and intensive family support (see section 2.4.4) to address these concerns.
2.4.2 MOVING ON: SUPPORTING CARE EXPERIENCED YOUNG PEOPLE 
As part of our relationship-based approach, we have focused on supporting young people make a positive transition
from care into independence. The table above illustrates a 71% increase in the number of young people in continuing
care (remaining in the care placement after reaching the age of 18) so they can leave care when ready and further to
our investment in after care services we have seen a 107% increase in the number of young people receiving support
– 252 18–26-year-olds as of 31 March 2024. 
Much of this support is coordinated by the Care Experienced Young Persons Operations Group comprising several
partners and care experienced young people as illustrated below: 
A Housing Operations subgroup looks at the housing needs, resources to support preparation and sustainability and
matching of young people to available properties. Through coordinated support there was a noted improvement in
care experienced young people sustaining tenancies, with over 100 young people sustaining their tenancy long term.
This was supported by partnership working with housing colleagues and the Tackling Poverty Team to quickly identify
any debt and budget management issues that may have impacted on young people sustaining a tenancy and ensure
their rights to financial support were in place. 
A dedicated and coproduced counselling service, the Exchange Counselling Project, was established and now operates
from our Aftercare Hub 5 days a week as well as reaching out to young people as required. In 2023-24, the service
worked intensively with 42 young people, with 78% of young people reporting improved wellbeing on finishing
counselling. Referrals indicated anxiety, family relationships/ home issues, violence and abuse, and bereavement were
the main reasons for presentation. 
Following a review of the unmet health needs of care leavers, NHS Lanarkshire agreed funding for two Throughcare
and Aftercare Nursing posts to deliver front line health support to care leavers and undertake an analysis of the
challenges and barriers faced by care experienced young people accessing adult services. One of the nurses started in
November 2023 and was working with 28 care leavers by March 2024. From the outset, it was apparent that this
support has made a significant difference in enabling care experienced young people to exercise their rights to
appropriate health care. 
Care leavers told us that they would like information about their rights and entitlement to support and this should be
accessible in the one place. Given the preference of young people to communicate and access information digitally, an
Page 138 of 214

Page 139

19 
aftercare website was developed in partnership with a group of care experienced young people and care leavers.
Aftercare North Lanarkshire went live in March 2024 and can be accessed via the QR code below. 
2.4.3 A LOVING HOME: ADOPTION, FOSTERING & KINSHIP CARE 
The Children’s Carers Service provides support to kinship carers, supported carers of young adults, as well as to
adopters and foster carers to achieve loving homes for children and young people into adulthood. Despite a reduction
of the overall number of carers, we have been able to place more children in North Lanarkshire thanks to the
commitment and flexibility of our carers supported by our carers team. 
Recruitment therefore continues to be a high priority. As can be seen from the table below, interest in fostering or
adoption has remained static post-Covid and the numbers of potential carers deciding to progress to an assessment
has not increased. Positively, however, 2023-24 saw an increase in fostering approvals on the previous year. This was
an indicator of the increased focus on recruitment through community-based initiatives. Adoption approvals have also
increased, representing the continued interest and enquiries for adoption which has now been consistent for several
years. As illustrated in the table below, this means that we are able to match children in need of adoption to adoptive
parents, mostly within North Lanarkshire. 
The recruitment strategy group developed an action plan to widen recruitment opportunities focussing on digital
promotion and increased presence within local communities. This included recruitment stands within hospitals and
local community events, on-line drop-in sessions for targeted staff groups within North Lanarkshire, and mail drops in
local communities. These were in addition to the bi-annual radio and media campaigns. 
15
11
15 14
1 1 1 1
11
18 19 17
0
5
10
15
20
2020-2021 2021-2022 2022•2023 2023-24
Adoption 2020-2024
Direct Adoption Agreed
Permanence Order With Authority to Adopt Agreed
Children Linked
Page 139 of 214

Page 140

20 
As well as recruitment, retention of existing carers has been a priority for the service. The training and support
programme for carers has therefore been enhanced to include adopters and kinship carers. Early indications are this
has been successful in increasing numbers of participants and feedback has been positive about the added value to
carers understanding of each other's roles and the needs of the children within their care. To support carer wellbeing,
sessions in mindfulness and mindful yoga were provided along with a second therapeutic support group for adopters
and permanent carers. 
An increase and backdating of fostering allowances (in line with the Scottish recommended allowance) and fees (10%
uplift) recognised the value North Lanarkshire places on its foster care resources. Similarly, an increase and backdating
of kinship allowances in line with the Scottish recommended allowance recognised the valuable and important role
kinship carers have. 
There continues to be an increase in children being placed with kinship carers. Therefore, there is a higher demand for
support for kinship carers from the kinship team. Over the last year support for kinship carers has developed and over
and above the allowances paid, the service provided direct support to 190 kinship carers. Kinship support groups also
took place on a fortnightly basis across Noth Lanarkshire and individual therapeutic and groupwork sessions were also
introduced involving mindfulness and yoga which were well attended by kinship carers at the children’s carers centre.
The number of children formally looked after in kinship care has increased over the past three years and in response,
we have recruited additional support workers to help carers manage the complexity and emotional demands of their
caring role. This will increase our capacity for practical and emotional support going forward. Our Virtual School has
also prioritised support to kinship families including in school holiday periods. 
68
120 128 131
30
63 68 57
16 21 28 28
7 8 10 9
0
50
100
150
2020-2021 2021-2022 2022-2023 2023-2024
Initial Enquiries and All Outcomes
2020-2024
Initial Enquires
Initial Interviews
Attended Prep Group
Progressed to Full Assessment
17
10
14
11
16
10
7 7 8
10
7
3
7
3
6
0
2
4
6
8
10
12
14
16
18
2019-2020 2020-2021 2021-2022 2022-2023 2023-2024
Approved Assessments by Type of
Resource2019-2024
Approved Assessments Adoption Foster Care
Page 140 of 214

Page 141

21 
When children need care, the priority continues to be to secure a foster family where brothers and sisters remain
together. In the last year, five of the eight groups of brother and sisters that required a fostering home, were placed
together. The reasons for not keeping brothers and sisters together were due to individual children’s needs and, for
one family, difficulty finding carers to keep four brothers/sisters together. However, in this situation, North Lanarkshire
carers have actively promoted their relationships. Updated permanence planning training for staff and guidance for
independent chairs emphasised the priority in considering brother and sister relationships. 
In response to feedback from our inspection from January 2023 specific life story training by was also commissioned
and delivered. Another area identified for improvement including through inspections of registered services was linked
to risk assessments. As a result, the risk assessments for placement requests and specific incidents were reviewed and
updated and is now established in practice. 
2.4.4 INTENSIVE FAMILY SUPPORT 
Community Alternatives & Families First
Our Intensive Social Work Services Team continue to successfully deliver whole family support 7 days a week where
families need a high level of support to prevent a child or young person entering care or to sustain a care placement.  
The service uses a range of materials to support interventions, such as structured parenting programmes and thematic
interventions. Over 2023-24, a review was undertaken of the core programmes and interventions used to support
children, young people, and their parents to ensure continuity and alignment with the supports available across the
partnership. To support the workforce, staff training and development sessions were undertaken in partnership with
health, early years and children’s house staff focusing on the Solihull approach to parenting, Assessment of Care Toolkit,
Infant Mental Health Indicator set in additional to training in Contextual Safeguarding and Safe and Together. This
enhanced the individual and groupwork support provided through the service and with partner agencies. The service
also delivered eleven thematic workshops to social work staff. 
Intensive Services work with around 450 children, young people, and their families at any given time. Over 2023-24
52% of the children and young people supported were living at home with their family; 20% were supported in a
residential, foster or a kinship care placement; 17% of the young people supported were care leavers needing a high
level of emotional and practical support and 11% were young people in the community subject to Structured Deferred
Sentence or Diversion from Prosecution or were supported through Youth Bridges whilst detained in Polmont YOI for
a period and through their transition back to the community. 
82
102 105 111
64
93 98 94
0
20
40
60
80
100
120
2020-2021 2021-2022 2022-2023 2023-2024
Number of Kinship Assessments
Approved 2020-2024
No of Kinship Assessments Total Approved
Page 141 of 214

Page 142

22 
Weekend support is a crucial feature of our approach to prevent crises or a child coming into care. On average the
service supported 28 individuals and families each weekend on a planned basis. The service also worked closely with
the Social Work Emergency Service (SWES) to respond to emerging care, protection, and support needs out of office
hours. 
In recognition of the additional challenges experienced by families over the school holiday periods and to offer positive
opportunities during the Easter and summer holidays, the service delivered individual support to families and daily
structured activities in the local community for younger children, attracting up to 40 participants and family-based day
trips with around 45 participants. There were a range of activities arranged for teenagers with between 6-10
participants in attendance at each and one weekend activity camp. All activities and trips received positive feedback
from the participants. 
Family Group Decision Making (FGDM) and Lifelong Links
The FGDM and Lifelong Links Service are an integral part of Intensive Services as part of our commitment to build on
family assets, promote and maintain important relationships. The team practice from a rights respecting and
strengths-based approach to support children remain in their family through listening and supporting families to
develop a family plan to sustain family care. The Lifelong links service has now been operational for nearly two years,
supporting young people make sense of their care journey and support reconnection for those who have lost
connection to important people in their life. The QR code below links to an animation that explains more about Lifelong
Links and a young person’s experience of the service. 
Referrals to FGDM and Lifelong Links have remained consistent over the past two years. 
Year Number of
FGDM Referrals
Number of
Lifelong Links
Referrals 
2021-22 115 N/A
2022-23 171 14 (partial year)
2023-24 172 16
Page 142 of 214

Page 143

23 
Of the referrals received for FGDM during 2023-24, 70 were successfully progressed to family meetings where a family
plan was devised, and 28 referrals progressed to a significant piece of work being concluded with the family without
a family meeting. 
Lifelong Links is long term work that takes a trauma informed approach going at the pace of the young person as they
come to understand their life story and consider who they want to reconnect with and how. Up until end of March
2024, 4 connections and 14 lifelong connections have been established with young people. 
A Right to an Education
Our Virtual School, which is an integrated service comprising social work and education staff, has a focus on inclusion,
providing bespoke packages of support based on a child’s needs, strengths, interests, and future career aspirations. 
For young people who are at significant risk of leaving school without formal qualifications, individual teaching input
is provided. Supported by curricular leads, this session Virtual School teachers were able to extend the range of subject
areas they could support young people to achieve in beyond English and Mathematics. National qualifications have
been achieved in History, Modern Studies, Media, People in Society, Hospitality and PE.  In session 2023-24 a total of
87 National 3 and 4 level qualifications were achieved by 27 young people working individually with Virtual School
teachers: 93% achieved a qualification in English and 93% achieved a qualification in Maths. 63% achieved three or
more national qualifications, 37% achieved four or more and 19% achieved five or more. 
In addition, ongoing partnership work across our schools and wider services to support care experienced learners and
reduce school exclusions continues to move forward positively with significant improvements recorded. For example,
over the past five school sessions, exclusions of care experienced learners have reduced overall by 93% (158 to 11),
learning days lost reduced by 93.5% (339.5 to 22) and the number of care experienced learners receiving an exclusion
reduced by 88% (92 to 11). This is an area of work we continue to prioritize in line with our commitment to fulfilling
the ambitions of The Promise. 
2.4.5 YOUNG PEOPLE IN CONFLICT WITH THE LAW 
At 13.0 per 1000, the proportion of children referred to the Children’s Reporter (SCRA) locally on offence grounds has
increased and remained higher than the national average. In parallel the number of referrals for Early and Effective
Intervention have decreased by 17%. In response to this and feedback from young people during a service review,
plans are already in in place to promote EEI as an effective alternative to referrals to SCRA. During the year we launched
our new EEI youth work service, The Compass Project, with the aim of promoting rights and relationships over
behavioural responses. The service delivers group work and bespoke individual support and a route into preventative
158
105 82
19 11
339.5
233
138.5
40 22
92 72 56
15 11
0
100
200
300
400
2019-20 2020-21 2021-22 2022-23 2023-24
Care Experienced Exclusions Summary:
2019-24
CE Exclusions Days Days Lost Young People
Page 143 of 214

Page 144

24 
universal offers (such as DofE) as part of a prevention model. This project launched in January 2024 and already 5
young people have gained outdoor learning awards and were linked into universal support and youth work
programmes. 
Between January 2023 and January 2024, North Lanarkshire also participated in a pilot with SCRA and South
Lanarkshire Council to improve the experiences and outcomes for children referred to hearings on offence grounds by
increasing their understanding of their rights, improving relationships, and ensuring supervision orders are tailored to
the plan of support. A dedicated speech and language service was offered to provide advice to social workers and
families and, where appropriate, direct support to young people to address unmet need and help them express their
views in hearings:
‘I like working with you. After I work with you my brain feels less fuzzy’ 
The pilot was evaluated by the University of West of Scotland, and initial findings have highlighted the impact of the
focus on relationships. The researchers found that support workers roles went beyond offence-focused interventions
to encompass a comprehensive family support approach. This included accompanying young people to the hearings,
providing practical advice, facilitating access to education or employment opportunities, and most importantly building
trusting relationships that help understand the young person's perspective better. This perspective was supported by
young people on the project who discussed the importance of the relationship-based practice that they engaged in
which helped build relationships with their own families, communities, and education. 
Youth Bridges has continued to provide support to young people subject to diversion from prosecutions and structured
deferred sentences and to young people under 21 subject to remand/ custody in Polmont YOI and through their
transition back to the community. The number of under 18s from North Lanarkshire continued to decline with only 2
young people under 18 being remanded to Polmont YOI over the year. One young person was remanded to secure
care. This is in line with the Scottish Government’s to end remand to Polmont for those under 18 in 2024. 
01/04/23-
30/06/23
01/07/23-
30/09/23
01/10/23-
31/12/23
01/01/24-
31/03/24
Young People Supported 37 43 43 42
New admissions Polmont YOI 8 7 11 7
Diversion/ Structured Deferred Sentence 9 7 9 13
Ongoing Support 20 27 23 2 
2.4.6 CHILDREN WITH ADDITIONAL SUPPORT NEEDS 
There was an increase in requests for assistance to the service for children and young people with complex needs,
particularly around young people experiencing neurodiversity. Across the year, 211 had access to an individual budget.
As a part of a wider service evaluation, we found that budgets alleviated stress for families and improved outcomes,
but that staff wanted to feel more confident in this area of work. The service has therefore strengthened its central
support to staff working with this group of children and young people to improve assessment and planning. Alongside
this we also used grant funding to invest in family support for children with additional support needs, working in an
integrated way across Social Work, Health, and Education. Improving the experiences and outcomes for this group of
children remains a key priority and further work in this area is planned over the coming year. 
2.5 ADULT SOCIAL WORK SERVICES 
In January 2024, a whole system project of work (Back-to-Basics), which aims to support individuals differently,
commenced. Back to Basics is an overarching approach, which comprises a range of discrete and inter-related
Page 144 of 214

Page 145

25 
programmes, projects and activities that support our wider approach across the whole system to ensure that when
people contact services, the response is quick and effective, with a focus on helping people to help themselves first. 
The overall ambition of the project is to have a system that is streamlined, minimises the risk of repeat actions for
people and makes best use of resources. This will ensure that we are offering people the right support, at the right
time and so increasing their quality of life, as well as increasing the quality of experience for staff in terms of work
satisfaction.  
Access Social Work continues to be the initial point where many people first come into contact with our service.
Pressures around Access, like other teams, continues to be grow. There is a high volume of requests for support which
could better be met by resources out with statutory services. As part of the Back to Basics approach this work will be
a focus of our development and improvements in the coming months. 
2.6 EARLY AND PREVENTATIVE INTERVENTIONS – RIGHT SUPPORT, RIGHT TIME 
Self-directed support, Getting It Right for Every Child (GIRFEC) and Getting It Right for Everyone (GIRFE) as well as the
Carers (Scotland) Act 2016 all emphasise the importance of choice and control early interventions and preventative
approaches. Our approach across 2023-24 sought to embrace these principles to ensure that people who required our
support experienced responses in line with these aspirations. 
2.6.1 GETTING IT RIGHT FOR EVERYONE (GIRFE)  
Getting it right for everyone (GIRFE) is a Scottish Government led multi-agency approach to Health and Social Care
support and services. Building on existing best practice and aligning with the GIRFEC approach within children’s
services it aims to provide a national framework to deliver Health and Social Care services that support person centred
outcomes for everyone throughout their adult lives. GIRFE is focused on providing a more personalised way to access
help and support at the time when people need it. It is aimed at placing the person at the centre of all decision making
that affects them, with a joined-up consistent and multi-disciplinary approach. 
UHSCNL is one of 10 place-based pathfinders with the progression of this work supported by the Scottish Government’s
GIRFE Design School. Our focus is on Frailty and Older People with the pathfinder linking to a range of local as well as
national aspirations, policies and strategies including The Plan for North Lanarkshire, the Health & Social Care North
Lanarkshire Strategic Commissioning Plan and the Strategy for Preventing and Managing Frailty. Learning from GIRFE
work locally and nationally will inform future policy and practice across the authority. 
Nationally, GIRFE work has reached the point where 16 prototypes are currently being tested, with North Lanarkshire
focusing on the following areas: ageing well, personal networks, accessible and usable information, peer support and
Community Hubs. A process of co-production with both people who live and use services in North Lanarkshire and
Health and Social Care staff is underway, with the consultation and co-design process having involved over 600 people
to date. Active testing of the GIRFE prototypes is now underway to enable the approach to be more widely interpreted
and implemented both locally and nationally. 
2.6.2 MAKING LIFE EASIER 
Disability Information Officers have been active in the community over the past year, promoting our Making Life Easier,
web-based service and supporting individuals to use the site and undertake self-assessments.  
The service also developed telephone assessments to help assessing staff during clinics/assessments. In addition, the
service invested time in work with ADL Smart care working on a new and improved website and life curve and
reviewing the content of the service system. 
Page 145 of 214

Page 146

26 
2.6.3 ASSISTIVE TECHNOLOGY TEAM 
The assistive technology team have continued to work across social work and the partnership to improve quality,
delivery, and safety in assessment and care planning aiming to identify and achieve outcomes with people supported
by the service in the least invasive of ways.  The team’s main ambition is that all individuals working for UHSCNL
consider assistive technology as a necessary tool to enhance and safeguard wellbeing and making sure the most
vulnerable people have the skills, connectivity, and devices to participate in a digital nation.  There is also focus on
reducing carer stress and empowering individuals, supporting independence and on reducing isolation whilst the team
can also offer solutions which complement other services whilst mitigating some of the demand on them. 
Across 2023-24 1,081 people were referred to the team. 36% of people accessing the service were over 80 years of
age, 38% between 61-80. There were 1,005 assessments of need and 267 assistive technology flat visits. There
continues to be upward trend for all referrals, assessments undertaken, and equipment provided. 
The assistive technology flat has been further developed and showcases an extensive range of council provided
assistive technology as well as technology which can be purchased privately. Funding for the flat derived from
housing budgets 2023-24. This will not continue for 2024-25 and an alternative source of funding will be sought. 
2.6.4 COMMUNITY ALARMS 
As of 31 March 2024, Community Alarm Service supported approximately 7,700 people with 6,150 individuals
supported in individual homes and a further 1,550 people in housing with support accommodation. The community
alarm service also supports around 1,000 pieces of assistive technology programmed through the alarm receiving
centre, with equipment ranging from door contacts to hard-wired smoke detectors for individuals with a cognitive
impairment. Response Advisors also provide support to out-of-hours Home Support and takes social work emergency
service calls from 01.30am. The average call volume each month received within Community Alarm is around 48,000
with around 2,180 of these leading to a visit from a Community Alarm Home Support worker (HSW) for face-to-face
support to be provided. 
The service’s current alarm receiving centre ‘Tunstall’ servers had been identified as becoming obsolete/end of life by
colleagues from Infrastructure resulting in the procurement of a ‘Software as a Service’ (SAAS) solution as we
transitioned to the new ‘Alarm Receiving Centre’ (ARC). As all UK telephone lines are being migrated to digital it is also
essential that we move to a fully digital community alarm system for both the devices and the ARC and to support this
Analogue to Digital Board meets every 8 weeks to have oversight of the ongoing works being undertaken to transition
the Community Alarm Service to a fully Digital solution.   Replacement of these analogue alarms commenced in
January 2023 and to date 3,000 units have been purchased and replaced. A further 1,000 units are currently being
procured for a planned installation by the end of September 2024. 
Page 146 of 214

Page 147

27 
Staffing levels within the Community Alarm service have remained largely unchanged since the service was established
and a priority over the next period is to review this in the light of both digital system developments, high call levels and
the diversity of needs supported by the service.  
2.6.5 EQUIPMENT & ADAPTATION SERVICE (EAS) 
The service has been internally reviewed and evaluated over the last year with changes informed both by scrutiny of
key processes and feedback from both Health and Social Care staff and service users. Importantly the service has
cleared all outstanding waiting lists and is progressing a proactive service delivery approach to facilitate delivery by
priority, helping avoid hospital admission and facilitating timely discharges. 
The service has also procured a new equipment ordering system which has assisted staff to deal with the demand on
service in a more streamlined way aiding improved communication and response times. The service can now record
and report more accurate performance information whilst qualitative data on how equipment delivered by the service
has impacted on people has been collated through a survey. Core staffing has been enhanced through recruitment to
additional posts and training. 
Looking ahead, the service is seeking to procure recycling equipment to ensure appropriate standard are met, increase
recycling time and rates within the service, and to reduce waste whilst there is ongoing work with Enterprise and
Communities colleagues to improve adaptation processes. 
2.6.6 INTEGRATED DAY SERVICES (IDS) 
Integrated Day Services (IDS) for older adults have continued to support people with complex support needs to safely
live in their own homes, often preventing admissions to hospital. Support that the service provides covers the six North
Lanarkshire localities. During Covid there were changes with IDS Nursing staff being redeployed to older adult
community mental health teams and these changes have remained apart from one locality. This will be addressed
through the current service review to agree a service model fit for purpose post covid, ensuring improved supports for
older adults in North Lanarkshire aligned to the Dementia Strategy. 
The IDS outreach via community groups continues in each locality, and these are well attended however transport and
community venues can be a constraint and locality link workers continue to work with local agencies to address this
and overcome any barriers to accessing this support. This is an alternative low-level support for older adults whereby
the fuller service is for people more advanced in their dementia journey. It is noted across North Lanarkshire that
dependency levels and complexity of need of people living in the community and needing support from IDS has
increased.  
IDS staff continue to provide high levels of support to people known to the service as well as to unpaid carers and
continue to stay committed, focused, and passionate about the positive contribution IDS has to older adults living in
North Lanarkshire. 
2.6.7 HOME ASSESSMENT TEAM (HAT) 
North Lanarkshire’s Home Assessment Team (HAT) is a multi-disciplinary Social Work, Health and Social Care resource
which applies a whole system approach to planning and preparation for hospital discharge and admission avoidance
by facilitating both assessment and intervention within each person’s own home. During the reporting period 1,224
patients have been referred to HAT and supported to return home from hospital. 
Page 147 of 214

Page 148

28 
As illustrated by the chart below, there has been a gradual build-up in the volume of referrals as staff have been
recruited and trained. Whilst all localities are not yet fully operational, an average of 102 people are currently
supported by the service every month. Those people who are referred to HAT are also being discharged quicker from
hospital to be fully assessed in their home environment, with 94% of individuals referred to HAT and discharged from
hospital on the same day. 
As the HAT developed, the team were able to accept more complex cases and fully implement the multi-disciplinary
teamwork that is required to support a ‘Home First’ approach. As more complex cases have been accepted, the
proportion of people recorded as completing the service with no further service required has decreased; however, we
know from our monitoring of delayed discharges that the HAT approach is improving flow. The contribution of the
Home Assessment Team also appears to be having an indirect impact on the Partnership’s overall performance in
relation to patients’ discharge being delayed in hospital. 
2.6.8 HOME SUPPORT SERVICE 
As of the end of February 2024, there were 2,305 people being supported by 955 Full Time Equivalent (FTE) care at
home staff across North Lanarkshire. The in-house service has a workforce of Home Support Workers (HSW) in
Reablement, HAT, Intensive, Longer-term Home Support provision and the Community Alarm Service. Across these
services, a total of 1,403 staff are employed, with a worker profile of 6% male staff (figure inclusive of 101 sessional
staff). In addition, there are 235 back-office staff in various support roles. Over the past year, increasing demand,
service complexity and the recruitment and retention of a skilled and flexible workforce has remained a challenge. To
mitigate this, we have implemented a range of actions to support improvement in the quality and consistency of care
and support across our Home Support Service. 
The service model is being reviewed to ensure it is fit for purpose, in the current environment, and into future, including
consideration of new roles introduced since 2019. Planned changes will ensure that the service is sustainable and can
support both demand pressures and our strategic ambitions, in line with ‘enabling hubs and the Back-to-Basics
approach. 
To support this, stakeholder consultation events were held in local communities to capture feedback on the current
and future service model with surveys to seek views on the service being issued prior to events, with paper copies and
QR codes also made available at these events. Initial analysis of feedback from people using the service and carers who
responded reported positive experiences of care and support delivered by HSWs (Home Support Worker). A common
theme from consultation however was the service not always getting the right balance of care and support for
individuals receiving a service. Data from consultation events was captured and any operational issues were addressed
Page 148 of 214

Page 149

29 
by Service Delivery Managers with a more general improvement action being the was provision of a link to all HSWs to
assist the service to prioritise reviews where the support required to be adjusted to meet individual outcomes 
Consultation events were also held for office-based staff during July 2023, and again held in each locality area. The
events supported the workforce to understand and commit to the vision behind service transformation. 
The service continues to work closely with the Care Inspectorate to meet requirements and improvements that have
been identified through the inspection process. All teams have now received a full inspection, with some teams
receiving follow up visits to address outstanding requirements. The new inspection year will commence in April 2024,
and the service has been informed each team will receive a full inspection during follow up visits. 
Over the last few months, the service has taken delivery of a brand-new fleet of hybrid 4x4 vehicles to replace its ageing
fleet. This investment supports North Lanarkshire Council’s drive towards ensuring that a more environmentally
friendly fleet of vehicles are in place supporting the citizens of North Lanarkshire. 
2.6.9 TRANSFORMATIONAL SELF-DIRECTED SUPPORT (SDS) AGENDA & INDIVIDUAL BUDGETS 
The overarching aim of the SDS (SELF DIRECTED SUPPORT) transformation agenda in North Lanarkshire is aligned with
the intention and values underpinning the SDS Act 2013 - to support and empower people to achieve the outcomes
that are important to them, to lead full and meaningful lives, and to participate in, and contribute to, their
communities. Our approach has a focus on ensuring that we deliver fully on the SDS principles of participation and
dignity, involvement, informed choice, and collaboration. 
In 2023/2024 we supported 2,480 people with an individual budget, delivered across the four options as shown
involving 99.7 million in resourcing and reflecting the centrality of self-directed support to social work practice:   
Option 1 – Direct payment - 360 
Option 2 – Budget managed by support provider – 1,957 
Option 3 – Budget managed by local authority - 152 
Option 4 – Budget managed by a mixture of first three options - 11 
Over this period North Lanarkshire have been represented on national groups reviewing the SDS Standards and
facilitated by Social Work Scotland. We continue to be part of the national group who are developing an approach to
the realisation of the standards reflecting our desire to support decision making as close to people as possible,
decisions being made quicker, empowering frontline workers and leaders, and increase local creativity. 
2.6.10 COMMUNITY LIVING CHANGE FUND/COMING HOME 
The Coming Home team has been in place since 2023, funded from the community change funding from Scottish
Government to identify and support planning for people in hospital or out of area for prolonged and unnecessary
reasons. 
The team have, through collaboration, identified the people who fall into this category and in line with Scottish
Government guidance, have populated a Dynamic Support Register (DSR) for North Lanarkshire. Coming Home Review
and implementation groups have been created to implement all the required measures to minimise people having to
leave our area for support or treatment and the team continue to link with each allocated social worker for those on
the DSR to track progress towards ensuring a suitable and preferred living arrangement is identified and actively
pursued.
Page 149 of 214

Page 150

30 
Understanding who is at risk of support breakdown is a priority and prevention of hospital admission is key. Work has
therefore also commenced to understand the at-risk population in more detail, with the aim being to explore what is
required to keep people as well supported and safe as possible. 
North Lanarkshire’s allocation of the change fund was committed for a two-year period and is set to cease in March
2025. We understand no further change fund resourcing will be available after this date. We recognise the areas of
focus and are using existing resources to develop our understanding further, with the aim being to minimise any impact. 
2.7 DIGITAL SYSTEMS TRANSFORMATION  
During 2023-24, there has been significant progress and investment in digital solutions to support the management of
social work and social care services. In addition to developments in Assistive Technology and those linked to the
Community Alarm Service reference above these have included:  
Mosaic Case Management System 
As part of the North Lanarkshire Council’s Digital NL programme of work and Digital and IT Strategy 2019-24, the
council carried out a cloud readiness assessment to determine which line of business system would be suitable for
transitioning to a range of cloud-based solutions. This reinforced existing service concerns around the functionality of
our SWIS case management system and led to a tender for a new system. Mosaic, the new Social Care Case
management system, will be used across all social work services and the tackling poverty team presenting significant
opportunities to improve worker access to relevant information, provide a single source for data on the people we
support, improve data analytics and reporting to inform service improvement, and better opportunities for data
sharing across the partnership.  Reflecting the scale of work required to safely and effectively support this transition
the development and implementation of Mosaic is supported by a project team, which has spent several months
working with teams from across all care groups and the wider system to configure the system to reflect our
streamlined processes and workflows with testing to take place in late summer, supported by a training programme
for staff commencing in Autumn 2024.   Importantly the functionality of the new system is designed to better support
practice.  
Dynamic Scheduling System for Care at Home Services (CM 2000)
As reflected above the Home Support Service is currently engaged in a service redesign exercise and within the context
of the wider redesign activity, has procured a digital solution to ensure staff capacity is optimally utilised supporting
the provision of over 6,000 visits per day by the approximately 750 home support workers on shift daily and
importantly also supporting improvement in continuity of service and the matching of the right staff with the right
skills to people at the right time, essential to the provision of quality care and services.
  
Procurement in February 2024 of the CM2000 product is anticipated to support service delivery by aiding back-office
staff to schedule support and adapt quickly to changing needs efficiently and effectively with the opportunity to
explore additional benefits which would allow both supported people and family members to access care notes via an
application allowing real time updates.     
ELMS 2 – Equipment Management System (Integrated Equipment & Adaptation Service)
The Integrated Equipment & Adaptation Service has for many years used a software platform which is no longer
supported. The system manages the day-to-day demands of delivering independent living equipment services across
both North and South Lanarkshire. This includes stock control and asset management. The legacy system has suffered
from a lack of integration across other systems and applications resulting in a reliance on paper-based systems and
processes requiring significant double keying, A newly procured software solution, ELMS 2, will now be implemented
to better support service requirements including:
• Direct ordering and tracking of orders technology providing delivery routes and times
• Linking directly to the stock control process, reducing administrative functions 
Page 150 of 214

Page 151

31 
• Use on handheld devices reducing the reliance on printed paperwork and providing real-time delivery
information to the prescribers and route management
• Improved monitoring of equipment due for review and maintenance
• Giving staff direct access to equipment catalogues stock levels and service users equipment history
  
ELMS 2 also offers interoperability and integration with Mosaic, 
Implementing these systems presents not just a shift from legacy systems, some of which are end of life, but also a
cultural shift in using digital platforms which allow the service to function differently.  The ability to access and generate
accurate and real time information to support practitioners, the ability for supported people to access their own data
and the enhanced data quality and integration offered by these products will continue to support the service across a
range of settings. 
3. STATUTORY INTERVENTIONS 
3.1 MENTAL HEALTH OFFICERS SERVICE AND ADULTS WITH INCAPACITY ACT (SCOTLAND) 2000 
There has continued to be considerable demand placed upon the Mental Health Officer (MHO) Service in recent years
in terms of orders being sought under incapacity law in part because of large scale investigations which meant that a
considerable resource had to be channelled towards meeting the demands of making new applications for orders.
There has also been a significant increase in private guardianship applications. 
As illustrated in the above graphic there is a marked increase in new orders. During the period 2022-23, there were
150 new ‘private’ Guardianship Orders, with a rise to 248 in 2023-24, an increase of 49.2% on the previous year.
Guardianship Orders granted to the local authority also rose from 73 in 2022-23 to 114 in 2023-24, representing an
increase of 43.9%. A similar trend is seen with Intervention Orders which rose from 5 in 2022-23 to 19 in 2023-24. This
representing an increase of 116.7%. 
The overall number Guardianship Orders in place for individual's resident in North Lanarkshire has fallen very slightly
by 23 to 1,031, involving 237 (23%) orders where the CSWO is appointed as Welfare Guardian, with the remaining 794
(77%) being ‘private’ Guardianship Orders. Reviews of all orders take place on a regular basis, with the intention of
ensuring that powers are being used in accordance with the principles of the Adults with Incapacity (Scotland) Act
2000. 
Despite the slight fall referenced above the significant increase in new orders is matched by an ongoing increase in
9
15
38
24
9
19
38
30
42
80
24
34
0
6 4 3 3 3
0
10
20
30
40
50
60
70
80
90
AIRDRIE BELLSHILL COATBRIDGE CUMBERNAULD MOTHERWELL WISHAW
Number of New Legal Orders
GUARDIANSHIP ORDERS (LOCAL AUTHORITY) GUARDIANSHIP ORDERS (PRIVATE)
INTERVENTION ORDER FINANCIAL/PROPERTY
Page 151 of 214

Page 152

32 
applications as illustrated below: 
Between April 2023 to March 2024, 272 new Guardianship Orders were requested an increase of 2% on the previous
year– this total is inclusive of renewal requests for ‘private’ Guardianship Order. Local Authority applications and
renewals totalled at 153 for the period. This continues a trend which has seen an increase of 67.3% in applications
since April 2021. It is possible that the impact of Covid and extensions to the expiry date of orders during the pandemic
may have had a bearing on these figures. However, what is evidenced is an upward trend in demand placed upon the
service to allocate MHOs, to complete reports to support AWI applications, to the Courts, under incapacity law. This
alongside recruitment challenges described below has led to delays in the ability to allocate MHOs to support
applications which are less urgent, a situation which the service recognises runs counter to our desire to support
anticipatory planning for individuals.  
3.2 MENTAL HEALTH (CARE AND TREATMENT) ACT 2003 AND MENTAL HEALTH (SCOTLAND ACT 2015) 
National trends for civil detentions under the Mental Health (Care and Treatment) (Scotland) Act 2003 have continued
to rise both nationally and locally. Locally there has been a significant increase in the number of recorded Emergency
Detention Certificates, up by 102% on the previous year and Short-Term Detention Certificates have increased by 4.4%
on the previous year, 2022-23 however, the number of Compulsory Treatment Orders has decreased slightly at 2.7%
less than the previous year. 
There has been a modest increase of 6.7% seen in the number of new requests for Mental Health Officer (MHO) input
to ‘forensic’ mental health orders under the Criminal Procedure (Scotland) Act 1995. The requirement for MHOs to be
appointed to Compulsion Order with Restriction Orders (COROs) and Compulsion Orders rose significantly with an
increase of 52.2% on the previous year, 2022-23. All these figures are illustrated in the table below: 
Total Emergency Detention
consents
(101) 203
[102% increase]
Total Emergency Detentions
where no consent was sought
(76) 47
[47.2% decrease]
Consent refused by MHO –
Emergency Detentions
(0) 0 
[No change]
Total Short Term Detention
consents
(247) 258
[4.4% increase]
Consent refused by MHO –
Short Term Detentions
(11) 6
[58.8% decrease]
Page 152 of 214

Page 153

33 
Total Compulsory Treatment
Orders
(191) 186
[2.7% decrease]
Total Forensic Report
Requests
(28) 30
[6.7% increase]
Total Forensic orders
supervised (CORO/CO)
(17) 29
[52.2% increase]
2022-23 data for comparison is highlighted in red. 
3.3 DEVELOPMENT OF MHO SERVICE TO MEET NEEDS 
Previous reports outlined a rapid development within the service during the Covid pandemic. This saw the
implementation of remote working and a centralisation of the MHO Service. Over the past two years, there has been
a return to face-to-face working with clients alongside a hybrid approach to meetings. The centralisation of the MHO
service at that time was seen to provide a degree of flexibility in the allocation of MHOs across the council area, to
help relieve resourcing pressures in specific localities, as far as was possible. On review in 2023 it was however agreed
that a return to locally based teams provided better connections and working arrangements for staff and better
supported effective planning for individuals. This has now been actioned following appropriate consultation processes. 
Internal development opportunities continue with Mental Health Officer forums held quarterly. These events allow
discussion on upcoming legislation and legislative changes and provide an opportunity for guest speakers to attend. 
Remote external training and development opportunities also continue through organizations' such as the Scottish
Forensic Network and Scottish Association of Social Workers. 
3.4 APPROPRIATE ADULT SERVICES 
It is a statutory duty for local authorities to deliver an Appropriate Adult (AA) Service under the Criminal Justice
(Scotland) Act 2016 (s99), in line with functions conferred by the 2019 regulations. This legislation also places a
statutory duty on Police Scotland (and other policing authorities as listed within the National Guidance) to facilitate an
Appropriate Adult (AA) whereby they believe that an adult (above the age of 16) requires support with communication
and understanding, owing to a mental disorder (s42). 
Over the last financial year, 12 new appropriate adults have been recruited, making the total number of Appropriate
Adults within North Lanarkshire Council 39. 29 of these carry out the AA role on a duty rota basis during office hours
whilst the remaining 10 undertake their role as an AA out-of-hours through the Social Work Emergency Service (SWES). 
In comparison to the last financial year, requests to the AA Service have increased by 30.5% from 59 to 77. This
continues to be monitored through quarterly reports alongside regular meetings with the AA’s and with Police
Scotland. The primary reason for people who requiring an AA was Learning Disability which accounted for 37 of the 77
referrals. 32 of the referrals were for Victims whilst 22 were for those ‘Officially Accused’, 16 ‘Not Officially Accused’
and 5 Witnesses. Of these 31 requests were to support adults involved with a Police Statement with the remaining
referrals varied for support in procedures such as Caution and Charge, DNA, Medical Examinations, Police Interview
Rights of Suspects (PIRoS) and Interviews. 
Currently, a process to gather feedback from the people using the service is being developed, to support feedback,
assurance, and improvement. Links have also been made with other AA services and with the Care Inspectorate to
share knowledge, skills, and experience to further develop the AA service within NLC. In the next financial year, the
aim is to have developed a wider self-evaluation framework. As part of this development, a staff survey has been
undertaken which has provided a further insight into the AA service as well as offering invaluable feedback on how to
support and further develop the AA team.
Page 153 of 214

Page 154

34 
3.5 PUBLIC PROTECTION 
3.5.1 ADULT SUPPORT AND PROTECTION VESTIGATIONS/CASE CONFERENCES AND STATUTORY ORDERS/
FUNCTIONS 
Over the period, North Lanarkshire received 3,314 ASP referrals, an increase of 9%, compared to 2022-23 (3034 to
3314). This is the fifth consecutive year that an annual increase has been measured. 
Referrals from NHS Lanarkshire colleagues continue to rise, showing a 11% increase compared to last year from 583
to 645 whilst ASP referrals from Police Scotland have increased 24% from 330 to 410. Social Work referrals fell slightly
by 2% from 408 to 399, whilst Scottish Fire and Rescue increased 5% from 110 to 116. 
Care homes were the highest ASP referrer group in 2023-24 accounting for 34% (1,124) of all ASP referrals received a
21% increase on the previous year from 933 to 1,124, in part reflecting the challenges in managing increasing
complexity of care needs within group living settings. Monitoring and support in this area is provided by colleagues in
Quality Assurance. In addition, a pan Lanarkshire task group has been set up through North and South Lanarkshire’s
Adult Support and Protection Committees with all care home stakeholders involved. This aims to provide support to
care homes to achieve a balanced and consistent approach in relation to ASP referrals and decision making. 
Whilst Police ASP referrals have increased, Police ‘Adult Concern reports’ continue to increase also with a total of
4,280 Police ‘Adult Concern’ Reports received during the period an increase of 7% and reflecting the significant activity
undertaken to keep adults in our communities safe. 
Physical harm remains the most common harm type for referral with 1,594 referrals received, up 11% from last year
This high number of referrals with physical harm as the primary harm type is closely linked to the high number of ASP
referrals received from the care home sector which often relate to witnessed/unwitnessed falls and low-level
altercations between residents. As noted, work with care homes and stakeholders remains a priority in ASP. 
Cases featuring self-neglect can be some of the most difficult and complex for practitioners to manage as they often
span ethical, legal, and practical considerations. For the period there were 309 ASP referrals relating to self-neglect,
an 11% increase in comparison to the previous year. Supporting good practice in these circumstances is a priority and
this area has been targeted through ASP multi agency training with a specific focus on defensible decision making and
professional curiosity. 
408
110 330 583
3034
399 116
410 645
3,314
0
500
1000
1500
2000
2500
3000
3500
Social Work Fire & Rescue
Scotland
Police Scotland NHS Total ASP
referrals
ASP referral sources
2022-23 2023-24
Page 154 of 214

Page 155

35 
ASP Inquiry with investigatory activity
It is important to note that NLC Social Work Adult Support and Protection procedures have now been updated. Key
changes within the procedures centre on language and how we now view ASP ‘Inquiries and investigations.’ We now
refer to initial inquires as ‘inquiries without investigatory activity’ and ASP investigations and ASP ‘Inquiry with
investigatory activity.’ Importantly investigatory activity involves any direct contact with the adult or their legal proxy,
as such, it is anticipated there will be a rise in investigatory activity, and this should be reflected in future reports. 
There was a total of 477 inquiries with investigatory activity in the reporting period reflecting the number of ASP
referrals which converted to inquiry with investigatory activity is 14%. This is a slight increase from last year’s
conversion rate of 13%. 
ASP Case Conferences
A total of 66 initial case conferences held and 56 review cases conferences were held meaning 14% of all investigatory
activity led to an initial case conference. This conversion rate has declined from the last reporting period (17% to 14%)
and reflects a continued decline in this rate over the last three years. 
Statutory Orders issued over the period: 
Type of Protection Orders Number of Protection Orders
granted
Assessment Order 0
Removal Order 1
Temporary Banning Order 0
Banning Order 0
Temporary Banning Order
with Power of Arrest
4
Banning Order with Power of
Arrest
2
Total 7 
The use of protection orders fell 50% compared to last year (15 to seven). It is recognised that where ‘adults at risk ‘are
subject to protection planning measures, and as such, a range of actions have been implemented to mitigate risk of
harm, this can reduce the requirement for an ASP Protection Order. 
3.5.2 MAPPA (MULTI-AGENCY PUBLIC PROTECTION ARRANGEMENTS)
Justice Social Work continues to work effectively within MAPPA arrangements to manage and support people convicted
of sexual offences or otherwise identified as presenting a risk of serious harm (ROSH) to maximise public protection,
whilst maintaining a proportionate and individualised approach to risk and need.   The number of individuals managed
under MAPPA has continued to grow year on year in part due to the rise in online offences contributing to increased
demand pressures on the service. The increase in the number of individuals being managed under the MAPPA process
with no corresponding increase in resource in funding and staff continues to put pressure on the service. This is a
situation which shows no signs of diminishing in the coming years. 
This reporting year has witnessed an 8.4% increase in MAPPA activity from the previous year. Overall, the number of
individuals managed under MAPPA have grown significantly since arrangements were established 17 years ago.
Page 155 of 214

Page 156

36 
More specific detail of MAPPA related activity is published annually within the pan-Lanarkshire MAPPA report. 
MAPPA arrangements interface often with other public protection processes including child and adult protection and
with adult social work more broadly due to the increasing number of individuals managed through MAPPA who have
care needs relating to frailty or disability.  MAPPA awareness sessions for wider staff groups are therefore held regularly. 
In March 2024, a local multi-agency event was held, focused-on people being managed and supported under the
Justice system with a diagnosed learning disability, or with neurodiversity challenges. This event was provided delivered
by NHS colleagues.  In addition, in partnership with South Lanarkshire Council and MAPPA partners two multi-agency
events were hosted in September 2023. Staff from Social Work, Police Scotland, Housing, and NHS Lanarkshire
attended a full day input in relation to Risk Practice which was delivered by Professor Hazel Kempshall. This offered a
valuable opportunity for colleagues to reflect on shared responsibilities, joint practice and strengthened collaborative
approaches to managing risk and enhancing public protection. 
3.5.3 CHILD PROTECTION INCLUDING CONTEXTUAL SAFEGUARDING 
Following a trend identified in previous annual reports, child protection notifications have continued to increase as
illustrated below representing a 125% increase from 2017/18. 
Year
Number
of
Referrals Investigations
Percentage Of
Referrals Proceeding
to Investigation
Number of
Investigations
That
Proceeded to
Case
Conference
Number Of
Registrations
from Case
Conferences
2023-24 2,326 768 33% 254 179
2022-23 1,895 775 41% 264 198
2021-22 1,714 754 44% 229 177
2020-21 1,482 831 56% 261 199
2019-20 1,617 800 49% 339 254
2018-19 1,150 642 56% 329 251
2017-18 1,030 692 67% 340 252 
The overall increase in the number of referrals received is related to the extension of our child protection framework
in line with child protection national guidance which now includes areas including care and risk management
arrangements for those young people whose behaviour may present a risk of harm to others and extra familial harm
within the contextual safeguarding approach. These extensions to our framework alongside Equal Protection legislation
and additional pressures on families have increased demand but also consistency in practice and recognition, and
response to harm, strengthened by early response to risk and harm by embedding our revised IRD (Initial Referral
Discussion) guidance. 
Contextually it is notable that one in four children still live in poverty and progress in addressing the developmental
concerns for children at 27-30 months slowed in 2023-24. Given the established links between poverty, harm, and
statutory interventions we believe this is also a factor in the continued demand for support to children in potential
need of protection. As noted elsewhere tackling poverty is fundamental to protecting children and supporting families
in North Lanarkshire and both child protection and family support responses are integrated with our approach to
tackling poverty, under the leadership of the Chief Social Work Officer. 
Page 156 of 214

Page 157

37 
Our increased referral numbers have not resulted in an increase in children whose names are placed on the child
protection register and this is due to the routes into our IRD process and the routes out of IRD. This means that
alongside or as alternative to Child Protection Registration children can, where appropriate be supported by care and
risk management processes, a referral to the Young People’s Safeguarding Panel and through family support provided
to the family through the Getting it Right for Every Child (GIRFEC) pathway. 
There has been an increase in older children’s (12+) names being registered on the child protection register. This change
indicates that practitioners and managers are increasingly focussing on and recognising the protection of older children
and their rights in line with our commitments to Keeping the Promise, the United Nations Convention on the Rights of
Children (UNCRC (United Nations Convention on the Rights of the Child)) and our investment in contextual
safeguarding, 
The service has continued to work with the partners in the Child Protection Committee, the Chief Officers, and Lead
Officers groups to monitor and understand the relationship between child protection referrals and rates of registration
to ensure the right children get the right support when they need it. Our data suggests that children and families are
receiving early help and support through our cluster wellbeing approach. This is telling us that our strategic focus and
commitment to early help and support, through staged intervention and planning for wellbeing, through the clusters
is the right direction of travel to improve outcomes for children and families. 
Joint Inspection
Between April 2023 and October 2023, the partnership was also subject to external scrutiny through Joint Inspection
of services for children and young people at risk of harm. 
The main findings from the inspection were: 
• The partnership has a strong multi-agency approach to early intervention, collaborative working, and
information sharing.
• Staff are confident in their knowledge, skills, and ability to recognise, report and respond to signs of child
abuse, neglect, and exploitation. We work together to ensure timely identification and responses to safety
concerns for children and young people at risk of harm
• Staff demonstrate trauma informed and relational practices, which help children and young people experience
supportive and trusting relationships with them.
• Children and young people have early access to services to support their mental health and emotional
wellbeing, before concerns escalated. Partnership approaches were helping to identify need and secure
support earlier.
131 125 116 111
54
96 96
0
20
40
60
80
100
120
140
2018 2019 2020 2021 2022 2023 2024
No. on Register as at 31
March 2024
56 63
54 58
24
33 29
38 44
33 32
19
34 31
27
12
22 16
5
25 29
0 0 2 0 1 2 510 6 5 5 5 2 2
0
20
40
60
80
2018 2019 2020 2021 2022 2023 2024
Age Range On The Child Protection
Register As At 31 March
0 to 4 years 5 to 10 years 11 to 15 years
16 years and over Unborn
Page 157 of 214

Page 158

38 
• The majority of children and young people are meaningfully and appropriately involved in decisions about
their lives. Staff listen to children and young people and understand them. 
• Senior leaders have a clear vision, which was understood by staff. It was threaded through strategic documents,
plans, and outcomes. The partnership was highly aspirational and has a strategic focus to improve outcomes
for children and young people. 
• Collaborative leadership is strong across the partnership. Leaders are aware of strategic risk and jointly
deployed resources to the areas of greatest need. 
Areas identified for Improvement:
• Chronologies, assessments, and plans are in place and staff are confident in assessing risks and preparing plans,
the quality of these chronologies, assessment and plans is inconsistent. This will be the focus of our
improvement work moving forward. 
Improvement activity cannot be achieved by the Social Work service alone and we are progressing the areas of
improvement highlighted by our own self-evaluation activity and the findings from inspection as part of the wider
partnership. Partnership actions are driven through our child protection business plan with the three main areas of
focus being:
• Voice: Strengthen Voice of children, young people, and families within the delivery of CPC functions
• Operational practice: Strengthen joint operational practice with a focus on the quality of assessment and
planning for individual children and young people. 
• Data: Strengthen the use of data to drive improvements in practice and process and strategic planning 
These areas for improvement are being addressed by the Continuous Improvement Group which reports to both the
CPC and Children’s Services Planning Partnership. 
Contextual Safeguarding 
As reflected above we have continued our commitment to embedding contextual safeguarding as a key vehicle to
address the increase in extra-familial harms impacting on our young people. Over the course of 2023 and into 2024,
we targeted Domains 2-3 above - improving staff awareness and understanding across the workforce while embedding
the recognition of, and response to, extra familial harm within child protection processes. This was reflected in the
finding of the Joint Inspection of a culture of rights-based, relational practice and collaboration between young people
and staff. Going forward we will have a focus on the conditions of abuse, improving safety, and providing support in a
Page 158 of 214

Page 159

39 
trauma informed way (Domain 1) in addition to taking a more strategic approach to the collation of impact data and
monitoring of outcomes (Domain 4). 
Key areas of development to promote social work practice in this area included the creation of an online training
module, the development of a Directory of resources and the availability of consultations for practitioners dealing with
complexities in this area.  
A key area of our systems supporting young people who may be experiencing extra-familial harm is our Young Peoples
Safeguarding Panel. Over this period panel actions were strengthened to focus on welfare and safety not surveillance
with a fourteen individual young people and two groups of young people referred. Key themes identified included that
many young people discussed experienced some neurodevelopmental difficulty, requiring specific support and follow
up. The panel continues to play a key role locally in ensuring that the exploitation that underpins the offences that
some young people commit is addressed through disruption and the reframing of information provided to SCRA
(Scottish Children’s Reporter Administration) and COPFS (Crown Office and Procurator Fiscal Service) to highlight the
exploitation and support to young people and peer groups in addition to the increased use of the National Referral
Mechanism where appropriate. 
Our senior officer for contextual safeguarding, played a leading role in a UK-wide research study of the experiences of
social workers using the contextual safeguarding approach. The findings of this continue to inform our approach to
staff support and training. - Sustaining Social Work: Practitioner experiences of Contextual Safeguarding | Contextual
Safeguarding 
3.5.4 GENDER BASED VIOLENCE 
Social Work staff across care groups continue to have a key role with respect to both the prevention and response to
Gender Based Violence (GBV). The last year has seen work progress through the VAWG to carry out Customer Journey
Mapping, a process of gathering information from women on their experience of services. Women interviewed were
survivors of domestic abuse. Key improvement actions have been developed from the information given including
domestic abuse inputs to trainee GPs (scheduled for the new year) an audit of out of hours homeless services to
determine domestic abuse practice and a domestic abuse development session for frontline police officers in
Lanarkshire Division.
A multi-year funding solution is now in place for North Lanarkshire MARAC. MARAC in North Lanarkshire in 2023/24
discussed 424 cases, 96% of victims discussed were female and referrals included 852 children. A quality assurance
sub-group is now in place and is chaired by Education and Families Manager (Social Work Justice). A process of auditing
MARAC meetings and MARAC cases has been approved. 
The implementation of the Safe and Together Model continues with over 150 children, families and justice social
workers trained in the model. Over 500 staff from multi-agency partner services have completed the Overview course.
Work is progressing to support workers to take learning into practice. Monthly Safe and Together workshops where
staff are supported to apply Safe and Together tools to a specific case are established. Workshops are open to workers
who have and haven’t completed Safe and Together training. 
Strategic linkages are in place with North Lanarkshire Council Equally Safe at Work planning group. The group have
representation from the VAWSG and has been working towards Bronze Award renewal. With a key milestone being the
launch of North Lanarkshire Council Sexual Harassment Policy.
UP2U Family Practice Model
The UP2U intimate partner violence approach continues to be invested in by Justice Social Work (JSW) with new staff
continuing to be trained in this programme and existing staff being given access to refresher training inputs. 
Page 159 of 214

Page 160

40 
UP2U – Creating healthy relationships 2 is the updated version of the domestic abuse intervention programme. Staff
have begun to use the updated programme with individuals convicted of intimate partner violence and who are subject
to a requirement to undertake UP2U. Integral to this intervention is the offer and provision of partner support for those
who have been or are still the victims of intimate partner violence. 
UP2U family practice is a version of the UP2U programme that can be delivered in a Children and Families context, and
this adopts a more flexible approach to early intervention where domestic abuse has been identified within a family.
This aims to work with perpetrators of domestic abuse to consider the impact on their children and the wider family.
All children and families social work teams have identified Family Practice trainers, and this is an intervention that can
be utilized as part of child’s plans. 
4. RESOURCES 
For financial year 2023/24 North Lanarkshire Council had gross annual social work budget of almost £310m. This was
allocated as £255m for Adult Social Care and £55m for Children, Families & Justice. The equivalent funding for the
previous financial year was £292m. 
In totality Social Work activity during 2023-24 was undertaken within the overall budget resource and resulted in an
underspend position. 
Social Work FY23-24 - Gross Expenditure Budget £309.547m
ACCESS SOCIAL WORK (£1.097m)
All Support Functions (£24.790m)
ASC Locality Support (Inc A&P) (£23.367m)
Assistive Technology (£0.130m)
CARE HOMES (£44.157m)
CARERS SUPPORT (£3.805m)
CHILDREN AND FAMILIES (£28.834m)
COMMUNITY ALARMS (£2.561m)
HOME SUPPORT (£55.331m)
IEAS (£6.290m)
JUSTICE SERVICES (£8.495m)
MENTAL HEALTH&ADULT PROTECTION
(£3.307m)
REGISTERD SOCIAL LANDLORDS (£0.716m)
SELF DIRECTED SUPPORT (£97.047m)
Children & Families A&P (£9.620m)
Page 160 of 214

Page 161

41 
Within Adult Social Care the underspend was almost entirely because of ongoing recruitment issues being seen across
the sector, both internally and within the care at home sector reducing the payments to these bodies.
The overall underspends across the service were a continuation of the 2022-23 position. These underspends however
are non-recurring and the longer-term outlook for the service projects financial pressures across the following areas:
• Home Support
• Independent Care Homes
• Self-Directed Services
• Integrated Equipment and Adaptation Service
• Children’s Houses
• External Placements 
4.1 FINANCIAL MODELLING FOR SERVICE DELIVERY 
Financial Planning and monitoring continue to be a key responsibility for the management team. The Council’s financial
strategy includes Service input to four key processes. These are:
• Preparation of detailed single year budget
• In–year budget monitoring and projections
• Preparation of rolling 3-year budgets
• Preparation of a Medium-Term Financial Plan 
Alongside these the Council Finance Team work closely with the IJB Chief Finance Officer to prepare a medium-term
financial plan for the Health and Social Care Partnership. 
In terms of financial modelling the Management Team increasingly take a whole systems approach to delivering new
and more efficient operating models which often requires joint working with other Council services and key external
partners. 
With respect to Children’s Services the council and local partnership is one of three areas who have committed to
working with the Promise team nationally on ‘Human and Economic Cost Modelling’, work which is intended to support
longer term change both nationally and locally by identifying how money is currently spent and the system changes
required to move the balance of spend toward early intervention and family support in line with the aspirations of
Christie. 
5. WORKFORCE 
Workforce planning within social work is overseen by the Social Work Workforce Group, which both informs and is
informed by the Council’s corporate ‘Workforce for the Future Strategy’ and the wider UHSCPNL workplan. 
5.1 WORKFORCE PLANNING 
Challenges in the labour market have impacted on recruitment to certain posts and the pressures on local authorities
and HSCPs to provide services in the face of savings agendas has also impacted on workforce plans. Demand pressures
have also continued to impact on the ask of the social work workforce over this period. 
To support overcome these challenges, a close partnership approach between the service and HR colleagues has been
built. Working together on recruitment, training and development and the management of employee absence, as well
Page 161 of 214

Page 162

42 
as developing and implementing initiatives has supported the service to manage demands whilst supporting workforce
resilience. 
5.2 SOCIAL WORK RECRUITMENT AND RETENTION 
Enhanced whole career support and development, allied to the wider ambitions of Workforce for the Future and the
Scottish Government ambition to create a strategic framework from qualification though to enhanced practice, remains
at the forefront of NLCs commitment to Social Workers. This work commences prior to recruitment, building strong
relationships with further education establishments and supporting student placements in the development of future
qualified Social Workers. 
Our commitment to the provision of Practice Learning has remained strong and a model which continues to include
student hubs has supported ensure quality learning experiences are available to all students as referenced in section
5.10 below. 
To support both enhanced career pathways and recruitment our Social Work Trainee Scheme was recently re-
established and funding for eight Social Work employees agreed via an earmarked reserve.  In order to support access
to a broader range of staff courses varying in length from 18 months to three years, dependent on the individual’s
current qualification level, have been sourced and funded, with the employees fully supported in becoming qualified
Social Workers. Due to popular demand 14 candidates who were not successful this time have had learning pathways
identified to support them to continue their journey to become a Social Worker. A further 25 employees are also
working through development plans with a view to progressing to the social work degree pathway. NLC has also
sponsored five self-funded employees, as they studied for their Social Work qualification. Recruitment opportunities
were made available to these students as they neared completion of their course. All five were successful and
subsequently offered Social Work positions within NLC. 
In addition to internal pathways, we continue to recruit externally, and advertising frequency and dates have been
reviewed to streamline processes and quicken the employee onboarding experience with improvements seen in recent
campaigns. We continue to offer immediate access to our Senior Practitioner scheme for eligible Social Workers. These
processes will continue to be reviewed, and improvements made wherever possible to support our ability to attract
and retain social workers in what remains a challenging context. 
During 23/24 we also commissioned research into the recruitment of social workers from global ethnic minority
communities, as we endeavour both to recruit a more diverse and representative workforce and improve the support
and the experience of our BAME staff. It is hoped that any changes implemented for Social Work recruitment will also
be of benefit to authority wide recruitment processes. 
Whilst too early to assess the full impact of the regrading of main grade, senior practitioner and first line management
social work roles reported last year and actioned on 1 May 2023 the council is now more competitive in terms of salary,
when compared to the other authorities and there are early indications of reducing vacancies and there is hope that
this plus the support and development that is offered will encourage applicants and assist in the retention of current
Social Workers.  In line with the re-evaluation of roles the job description and employee specification for social workers
has now been reviewed, and issued to all Social Workers, bringing this in line with the expectations of the role within
an increasingly complex context whilst remaining grounded in relationship-based practice. 
Recruitment to temporary posts however remains challenging. These requirements exist for a number of reasons,
including temporary promotions, maternity leave and long-term absence cover and the increasing number of roles
related directly or as backfill for posts supported through temporary funding streams principally linked to Scottish
Government recovery funding in justice services and change initiatives in other areas.   Temporary vacancies are being
Page 162 of 214

Page 163

43 
closely monitored in terms of numbers, locations and the impact on teams.  Whilst for a period, and in line with
predicted turnover, the service was able to offer permanent contracts against temporary vacancies for social workers
the capacity to do this has reduced as vacancies have decreased and many temporary funding streams remain
committed only to the end of the parliamentary term. 
Whilst social Workers are being appointed through NLC recruitment processes and entering the workforce with new
skills, creativity, and commitment there are now issues relating to the balance of experience within the service with a
high number of relatively newly qualified staff.  To mitigate this for both new and experienced Social Workers, managers
are monitoring caseloads, assisting in the prioritisation of statutory responsibilities, and ensuring additional supports,
such as Health and Wellbeing, are available when required. Support is also being provided through the hubs and the
TOD Team are working closely with the service. 
The commitment to the requirements of the Support Year in Practice in both time and resource is substantial. A review
of the Supported Year in Practice has recently been undertaken to ensure compliance with new requirements issued
by SSSC, ‘Definitions of employer support 2023’. Prior commitment to NQSW support and development assisted NLC,
however lack of funding from the SSSC or Scottish Government to support these requirements beyond the pilot period
is disappointing and reconfiguration within the TOD team and additional input from managers will be required to retain
commitment to this key area of support for staff. 
Targeted advertising has proven invaluable in securing the skill and experience required for specific posts in hospital
and home assessment teams however recruitment, in particular external recruitment in the key area of Mental Health
Officer roles has remained challenging and has not kept pace with need impacting on service provision in key areas. 
We continue to be committed to promoting the MHO programme to existing Social Workers within the service. The
route is through the MHO Traineeship Scheme, which supports Social Workers in gaining an MHO award – a
postgraduate award through the University of Strathclyde, Glasgow. It is expected that three MHO trainees will
successfully complete the MHO Award in June 2024, to then take up full-time MHO vacancies within the service.
To further support the MHO Service and to help expedite the discharge of hospital patients awaiting powers under
AWI legislation (typically in the form of Guardianship Orders), the MHO Service now has eight sessional MHOs who can
be allocated work thus easing a significant pressure on Locality-based MHOs. 
Funding for temporary positions within the Community Mental Health Teams continues, allowing Social Workers from
across Education and Families, Adults and Justice Services who are considering applying for the MHO award, to be a
part of a Mental Health Team. The establishment of the Practice Assessor role and the ongoing work of the postholder,
not only for MHO students but also for those who have expressed an interest in the course, is invaluable. 
Opportunities for experienced Social Workers including MHOs include the Senior Practitioner Scheme. This scheme
maintains our commitment to Social Workers, and Community Occupational Therapists, beyond qualification and
appointment. With over 50 practitioners holding the status the scheme enables those who meet the criteria to progress
to an enhanced salary scale. The service also benefits with Senior Practitioners committing to undertake additional
responsibilities within the authority. 
5.3 SOCIAL CARE 
Linked with both the national and local focus on supporting hospital discharge and providing quality support and
reablement within the community a significant focus remains on the recruitment of home support workers and other
social care roles. Recruitment to these positions is in line with the strategic direction of the service and whilst there
has been success, staff turnover has resulted in little net increase in staffing numbers overall. Monitoring of
recruitment and the placement of newly appointed HSW across the six localities therefore continues with the wider
Home Support Service review referenced earlier having a key focus on a sustainable staffing model.
Page 163 of 214

Page 164

44 
In recognition of the key role that Home Support Schedulers play within the Home Support Service, six new Home
Support Scheduler Supervisors have been introduced. To date, five positions have been filled, and the remaining one
will be advertised. These roles will direct, guide, and instruct scheduling through a person-centered approach, ensuring
excellent customer service. 
5.4 OTHER RECRUITMENT AND RETENTION CHALLENGES 
Other areas in which recruitment challenges are evident include roles within Locality Support Services and Clerical and
Administration posts. The recruitment and retention difficulties within Social Work administration have resulted in a
planned review and redesign which will progress over the coming year. In the interim action is being taken to promote
recruitment to these difficult to fill roles, for example, linking directly with local colleges as adverts are released and
work continues to develop apprenticeship schemes as a route into these areas. 
The service has also benefited from the corporate Summer Placement Programme developed to provide paid work to
NLC pupils for seven weeks of the school summer holidays.  Over the summer, fifty placements were made within
Social Work services in roles such as HSW, Locality Support Worker and Clerical Assistant. Placements within other
services have also been facilitated, for example in Early Years, Customer Service, Health and Safety and Sports
Development. 
5.5 CARE ACADEMY  
During this year and drawing on funding from the UK Shared Prosperity Fund and earmarked HSCP reserves projects
taken forward under this umbrella have included:  
Project one – Trainee Social Worker Scheme
As noted in section 5.2 above there are eight internal Social Work trainees who have been successful in becoming part
of this programme with a further 46 now on the pathway to gaining the necessary qualification which will allow them
to be considered for future programmes. 
Project two – Upskilling for Home Care Workers
In line with the qualification agenda, we continue to utilise the monies available from the UK Prosperity Fund to
develop a training pathway for our Home Support staff. Our partnership with New College Lanarkshire has enabled us
to procure access to ongoing spaces for the programme over the next year with another 60 workers currently
undertaking qualification from our August 2023, November 2023, and March 2024 cohorts. The success of this
programme has also allowed us the opportunity to extend this relationship with New College Lanarkshire with us
recognising the ongoing staffing difficulties within the service and the level of new recruits also requiring access to
qualifications within a shorter time frame.  
Project three – Home Care Support Officers
We are continuing to liaise with services across the Home Support workforce to identify opportunities to support this
group of staff to access suitable qualifications and opportunities for future employment pathways. However, this work
will now be aligned with the redesign of the home support service and the new structure of the staffing complement.
We envisage using available monies from the UK Prosperity Fund to ensure that we invest in this group of staff to both
attract and retain the quality and skills of our support staff who are a vital resource for home support services. The
group which will be targeted initially are the Schedulers and Senior Schedulers. A relevant career pathway has been
built for this group of staff with access to a recognised qualification.  
5.6 WORKFORCE DEVELOPMENT AND STAFF SUPPORT 
Our online platform for learning, LearnNL is a key component in providing improved access to learning and provides
each employee with an individual learning record linked to the Performance Review and Development (PRD process). 
Page 164 of 214

Page 165

45 
The reporting function within LearnNL allows us to filter and sort information in a variety of ways and ensures that
training-related information can be shared quickly and easily with colleagues and with the Care Inspectorate when
required. A specific social work space developed within the platform allows staff to see what training opportunities
they should be accessing as part of their mandatory training requirement and optional opportunities for development
and future progression. 
5.7 ASSESSMENT CENTRE AND REGISTRATION 
Continued provision of qualifications through the Assessment Centre 
The Assessment Centre continues to support Scottish Vocational Qualification (SVQ), and Professional Development
Award (PDA) qualifications required to meet registration, role and CPD requirements. This is achieved through both in
house assessment and access to SVQs through external providers. 
Active Candidates – External Programmes (2023 – present) 
Scottish Credit and Qualifications Framework (SCQF) Level 6 (SVQ2) – 48 including Home Support and Locality Support
Staff 
SCQF Level 7 (SVQ3) – 23 including Residential Workers, Locality Workers, and Justice Staff 
SCQF Level 9 (SVQ4) – six including Senior Residential Worker, & Locality Support Manager 
Higher National Certificate (HNC) – two Residential Worker and Children & Families Support Worker 
Active Candidates – Internal Programmes (2023 – present) 
SCQF Level 7 (SVQ3) – two: one HSW and one Technology Support Assistant 
5.8 POST GRADUATE OPPORTUNITIES 
The team also continue to provide access to Post Graduate Certificate opportunities through the Learning and
Development budget. The numbers undertaking some form of qualification are detailed below: 
• Advanced Practice skills – one commenced September 2023 
• Postgraduate in Child Welfare and Protection at Stirling University – four candidates commenced September
2023 due finish June 2024
• Postgraduate Certificate in Children and Young People in Conflict with the Law – two candidates started in
September 2023 completed June 2023 
• Postgraduate in Adult Support and Protection – three
• Postgraduate Certificate Securing Children’s Futures – one
• Postgraduate in Mental Health – three
• MSc In Leading People Centred Care – one
• Part funding of final year of PHD qualification – one 
5.9 SOCIAL WORK DEGREE PATHWAY WITH THE OPEN UNIVERSITY 
As reflected in section 5.2 there continues to be a strong appetite across all our Social Work and Social Care workforce
in becoming a Social Worker. We have had interest expressed from admin staff, HSWs, education and family support
workers, locality day services staff and other staff. We are currently working with 46 members of staff on individual
learning plans; all of whom are undertaking Open University modules and working towards a degree in Social Work. 
The monies received from the UK prosperity fund enabled us to fund modules for staff from October 2023 to May
2024. We anticipate further use of the UK prosperity fund later this year to again support staff on the pathway and
further modules commencing in October 2024 and February 2025. 
5.10 STUDENT SOCIAL WORK HUB 
Page 165 of 214

Page 166

46 
From August 2023 to date, 60 Social Work students were placed within North Lanarkshire; 52 being external students
from four different Universities, with 14 of these students securing Social Work posts within North Lanarkshire and
now progressing onto our NQSW supported year. 
From August 2023 onwards we have been developing two student Hubs: one Community Care Hub and one Justice
Hub. Both Hubs have evaluated well, with very positive feedback received. 
We have seconded two full-time Practice Learning Officers and a permanent Practice Learning Officer who also
oversees the NQSW supported year. Our Hub activity continues to grow and expand, and we foresee this continuing to
develop in line with Service needs and demands. The Hubs are a reflective and educational forum for the students to
experience peer to peer support, 1:1 teaching and support from their Practice Learning Officer. They also take part in
extensive training sessions and presentations by external speakers whilst direct teaching from their Practice Learning
Officer has included risk assessment theory, outcome focused practice, anti-oppressive practice, reflective practice,
unconscious bias training, exploration of use of self, development of professional accountability, authority, and
assertiveness. All of which are crucial in solidifying the fundamentals required of a qualified Social Worker. The students
have also benefited from the relationship and links created within the Hub to gain shadowing opportunities and
learning experiences with various other service areas/ 
5.11 NEWLY QUALIFIED SOCIAL WORK PROGRAMME 
The Newly Qualified Social Worker (NQSW) Supported Year referenced in section 5.2 above will become mandatory
across Scotland from October 2024. This is to ensure that support is given to NQSW in their transition to front line
practice enabling us to develop an increasingly confident and competent workforce for the people who use our services
and their families. 
5.12 OTHER KEY TRAINING AND DEVELOPMENT ACTIVITIES 
Provision of a practice learning pathway for link workers 
We have 120 link workers, and twenty-five practice educators based onsite with students on traditional placements.
We currently have five link workers applying to undertake the PDAPL, which starts in September 2024. We also have
a waiting list of link workers all interested and working towards making applications for the next PDAPL intake in
January 2025. 
To fully support the Service and ensure the learning and development needs of all staff are met, a Social Work Learning
and Development sub team was established in March 2023 consisting of two Senior Learning and Development
Advisors, two Learning and Development Advisors and two Clerical Assistants. This team have been responsible for
the implementation of a range of initiatives including: 
An updated programme of Adult Support and Protection Training including the delivery of ASP Level 1 refresher
training to 1,000 staff and bespoke ASP level 2 training for home support team leaders.  
Provision of Getting it Right in Child Protection training including a broad range of e learning modules in child
protection awareness, contextual safeguarding, understanding child neglect, assessment and planning for children and
young people, child sexual exploitation and Age of Criminal Responsibility with over 2, 800 course completions.   
Safe and Together - We are working alongside our Child Protection Committee and our partners at the Safe and
Together Institute to look at the further possibilities of commissioning specialist eLearning modules and materials in
relation to the Safe and Together Model.  
Page 166 of 214

Page 167

47 
Continued provision of Moving and Handling and Medication training - 352 Home Support staff and nine Home
Support team leaders have attended role specific moving and handling training during reporting period.    
Implementation of a robust induction programme for HSW’s  152 HSWs have attended induction training since April
2023. The online HSW induction course is currently being reviewed. 
Carrying out a full Training Needs Analysis (TNA) across the Service to identify key learning and development
needs as part of the development of the Learn NL Social Work dashboard.    
Refresh and reintroduction of Assessment, Planning and Recording Practice learning, this will also align with the
most recent Back to Basics approach in Adult Services and Signs of Safety and Healing in Children’s Services ensuring
person centred practice is at the forefront. This work was supported by a Steering Group of managers, practitioners
and TOD staff who refined the training materials to ensure alignment with North Lanarkshire’s value base and best
practice in addition to making the training more accessible, sustainable, engaging, and interactive to enable staff to
re-access the training materials and learning whenever they require in the future. 
Introduction of Autism Awareness and Neurodiversity training delivered by facilitators with lived experience has also
been a huge success. As of March 2024, we have commissioned Part 1 “Making Connection” and Part 2 “Building
Bridges” as well as bespoke models which has resulted in 61 members of Social Work staff completing this targeted
training. 
Refresh of the Senior Practitioner programme - It is envisaged that the new model will enable Senior Practitioners to
be involved in development opportunities across the services and to utilise their enhanced skills and qualifications for
the benefit of the wider community.  We also envisage the involvement of our senior practitioners in the roll out of
future assessment and planning developments and offering support to their Senior Social Workers by fulfilling
supervising and mentoring roles to our NQSW in their supported year as per the revised standards and framework. 
Justice training and staff development has included Naloxone Training delivered In partnership with NHS
Lanarkshire’s Harm Reduction Team, to help staff to respond confidently and appropriately to situations of
overdose and assist combating the number of drug deaths among people engaging with Justice Services in
North Lanarkshire. A continued training schedule is in place to ensure that all relevant staff receive training
on this intervention. 
5.13 TRAUMA INFORMED PRACTICE 
Implementation of Trauma Informed training 
Towards the end of March 2024, we successfully adopted and integrated Trauma Informed Practice eLearning modules
from the NHS digital platform TURAS to our own LearnNL.  Since the launch of the modules in March 2024 staff have
been able to access all the materials digitally. We envisage that work in this area will continue to grow with the roll
out of the face-to-face ‘skilled’ and ‘enhanced‘ level training, as well developing our training for trainers programme
which will enable us to develop our own team of in-house facilitators ready and able to respond to any training
requirements in relation to trauma informed practice. 
5.14 REVISION OF SUPERVISION POLICY 
Over the past year and following consultation our supervision policy has been updated and linked to a new toolkit of
resources to support reflective and outcome focused practice aligned to developments in practice and also
recognising that whilst one-to one supervision remains fundamental to social work practice that other supports such
as group supervision and case consultations can play a key role in supporting practice. 
Page 167 of 214

Page 168

48 
5.15 SUPPORT FOR STAFF WELLBEING 
Within each locality a variety of teams have held development days focussing on Health and Wellbeing (HWB), staff
resilience and supports, team building, and this continues. Recruitment for an North Lanarkshire HWB officer took
place, an appointment made in early 2024 to support this activity and to work with the NHSL HWB officer for a joined-
up partnership approach. HWB is at the forefront of staff development. Various Social Work management teams were
subsequently engaged by Organisational Development (and the health-based Staff Health and Wellbeing Officer), with
particular focus on the ‘Stay Conversation’ project. These initial briefings and workshops have led to engagement across
a range of teams for ongoing collaboration looking at enhancing Social Work Wellbeing. 
6. LOOKING FORWARD – PRIORITIES FOR 2024-2025 AND BEYOND 
Continuing the pattern of the last two years demand for social work and social care services, often accompanied by
increased complexity of presenting need, has continued to grow and surpass pre-pandemic levels across all areas of
social work driven by a range of demographic and societal trends including continuing cost-of-living pressures
impacting on the resilience of our communities.  This is a pattern that is likely to continue into the immediate future. 
Whilst the service has been successful in maintaining a strong balance of care existing pressure points such as those
on care at home services and MHO services have also been supplemented by new ones, for example growing demand
for children’s house places. 
Neither the council or IJB have to date responded to financial pressures by reducing core social work staffing, however
nor has there been capacity simply to expand resources to meet demand and pressures on wider budgets are also
likely to continue to impact on social work service delivery. Moreover, innovation and investment in service
improvement and redesign for longer term sustainability is increasingly reliant on temporary funding streams many of
which are uncertain beyond the current Scottish parliamentary term creating additional challenges in planning, 
Alongside additional uncertainty associated with future proposals for a National Care Service, the proposed National
Social Work Agency, review of elements of social work education and discussions on a national improvement
programme, albeit focussed primarily on social care, have brought welcome attention at national level to the key role
of social work.  It is however disappointing in this context that commitments for investment have not matched those
made to some other areas of the public sector with even relatively modest developments like the embedding of the
‘Supported Year In Practice’ from 2024 implemented with no funding support. 
Locally there is some indication that investment in the social work workforce may be reducing vacancy levels and the
number of our own staff seeking a pathway into social work is positive and encouraging however although the
potential introduction of a graduate apprenticeship in social work nationally is a welcome development it is unlikely
on its own to meet need.   
Key areas of workforce focus for us going forward will include continuing efforts to grow our MHO workforce and to
address the workforce vetting requirements associated with the introduction of MAPPS (a highly secure home office
system) within justice services.  Further work is also planned to consider the implications of local research relating to
diversity in recruitment alongside national findings on racism experienced by BAME staff.   In addition, continued
attention to staff well-being and trauma informed systems will remain key both to supporting retention and best
practice. 
In this context both to support improved outcomes and experiences for those who need our support and for demand
and cost avoidance, the continuation of our focus on prevention will be critical over the coming year.  Vital to delivering
this will be our programmes to improve core practice such as the ‘Back to Basics’ work in Adult Services and ‘Signs of
Safety and Healing’ in Children’s Services alongside continuing investment in early family support and carer support. 
We will also continue to maximise the opportunities created by the integrated working embedded in the Programmes
of Work for the Council and that supporting the HSCP’s Strategic Commissioning Plan with a key focus also on
improving outcomes and continuity of support at key transition points. 
Page 168 of 214

Page 169

49 
The redesign of social work administration to a business support model alongside work to introduce the new social
work management system Mosaic and the ELMs2 and Dynamic Scheduling Systems for the Integrated Equipment
Service and Home Support respectively, will all involve significant preparation and time and people resource over the
coming year but are again vitally important to future operational efficiency. 
Finally, the requirement to respond to and embrace a plethora of national policy and legislative drivers, external
scrutiny findings and continued reporting requirements to the SCAI (Scottish Child Abuse Inquiry) will also continue to
place significant demands on the service over the coming year.  A continued focus on strong partnership working
across and beyond social work including with those who use our services will be central to ensuring that our workforce
is not overwhelmed and can instead continue its central role in delivering positive outcomes for our communities. 
Page 169 of 214

Page 170

Page 170 of 214

Page 171

North Lanarkshire Council
Report
Adult Care and Social Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    CR/SF Date 12/11/24 
Adult Social Care Performance Report – Quarter 1 2024/25 
From  Claire Rae – Chief Officer – North Lanarkshire HSCP  
E-mail Claire.Rae@lanarkshire.scot.nhs.uk Telephone 01698 858143 
1. Background 
1.1 The Chief Officer has joint quarterly performance review meetings with the Chief
Executive of NHS Lanarkshire and the Chief Executive of North Lanarkshire Council.
These meetings are supported by a Chief Executive Performance Framework
comprising a range of performance measures from across both health and social work
systems, including relevant targets and trajectories. 
1.2 Based on a traffic-light system there are areas for improvement identified within the
performance framework each quarter for those that are flagged as Red or Amber. The
performance review meetings are used as a means for jointly agreeing corrective
actions. 
Executive Summary 
The purpose of the report is to provide an update to the Committee on the performance of
key areas of activity within Adult Health & Social Care for the period 01st April 2024 to 30th
June 2024 (Quarter 1 2024/25). 
Recommendations
It is recommended that the Committee: 
(1) Endorse the improvement actions included within Appendix 2 of the report; and
(2) Acknowledge the performance of key areas of activity within Appendix 1 of the report. 
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Resilient People
Item 8
Page 171 of 214

Page 172

1.3 Information from these performance reviews has been supplemented with additional
performance information below to offer the committee a wider overview of performance
across some key areas of adult social care delivery. 
2. Report 
2.1 The purpose of the report is to provide an update to the Committee on wider
performance of key areas of adult social care delivery, in addition to the performance
areas for improvement which have been identified as part of the Chief Executive
Quarterly Performance Review for the period 01st April 2024 to 30th June 2024 (Quarter
1). 
2.2 The performance data for Quarter 1 and associated trend information is included as
Appendix 1. 
2.3 Areas for improvement and planned actions are agreed and developed on an exception
basis (i.e., for those indicators which are amber or red, based on tolerance thresholds).
These are detailed as Appendix 2 of this report. 
3. Measures of success 
3.1  Measures of success are contained within Appendix 1 of this report. 
4. Supporting documentation 
4.1 Appendix 1: Adult Social Care Dashboard 
4.2 Appendix 2: Areas for Improvement (01st April 2024 to 30th June 2024, Quarter 1) 
Claire Rae
Chief Officer North HSCP 
Page 172 of 214

Page 173

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 173 of 214

Page 174

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 174 of 214

Page 175

Appendix 1 – Adult Social Care Dashboard 
PLEASE NOTE FOR ALL INDICATORS UPWARDS ARROWS DENOTE POSITIVE PERFORMANCE 
Ref.  KPI Target
2023-24
2023/24 Q1 2023/24 Q2 2023/24 Q3 2023/24
Q4
2024/25 Q1 Performance
Compared
to Previous
Quarter
Performance
Compared
to Same
Quarter
Previous
Year
Current
Performance
2.15 Assistive Technology - Number Of People
With Technology (0-17 yrs)
1,452
28 28 31 31 35  
GREEN  2.16 Assistive Technology - Number Of People
With Technology (18-64yrs) 632 631 618 624 632  
2.17 Assistive Technology - Number Of People
With Technology (65+) 818 825 856 858 905  
2.18
Reablement - Number Of People Completing
Reablement Process
2000
(500
per
quarter) 
376 816 1355 2011 527   GREEN 
2.19 Reablement - % Of New or Increased Home
Support Packages Which Are Reablement 70% 64.0% 70.3% 70.0% 60.8% 61.1%   RED 
2.2
Reablement - % Of People With No or
Reduced Home Support Service Required At
End Of Process
70% 45.8% 48.0% 58.8% 58.5% 62.6%   RED 
2.21 Balance Of Care - % Of People (Age 65+) 45% 40.2% 36.7% 34.0% 36.4% 37.1%   RED
2.22 IEAS - % Deliveries Achieved Within 7
Working Days Quarterly 80% 47.5% 49.9% 53.5% 63.4% 87.1%   GREEN 
4.2 Complaints Processed Within Timescale (NLC) 85%
84% (Stage
1) 100%
(Stage 2) 
76.5%
(Stage 1)
57.1%
(Stage 2)
81.3%
(Stage 1)
100%
(Stage 2)
92.9%
(Stage 1)
100%
(Stage 2)
81.1%
(Stage 1)
87.5%
(Stage 2)
  GREEN 
4.3 Care Home Placements At End Of Quarter -
Per 1000 Popn 65+ 24 21.7 22.0 21.9 22.0 22.1   GREEN 
4.4 Care Home Placements At End Of Quarter -
Per 1000 Popn 75+ 50 44.9 45.8 45.6 45.9 46.3   GREEN 
4.5 Care Home - Average Length of Stay  865 832 891 835 834 708   GREEN 
4.6 Number Of People With Self Directed
Support  1,000 2070 2093 2092 2089 2054   GREEN 
Page 175 of 214

Page 176

4.7 Number Of People With A Direct Payment 240 329 342 357 379 355   GREEN 
6.1 Community Alarm Service Users 75 Years And
Over Per 1000 Population
Under
Review 191.8 193.9 196.5 195.8 196.7 … … …
7.2 % Of Adult Protection Referrals Passed To
Care Team For Investigation 20% 12.4% 14.8% 12.7% 20.1% 24.7%   GREEN 
7.21 % Of Adult Protection Investigations Going To
Initial Case Conference 20% 20.3% 10.4% 19.2% 11.9% 12.3%   RED 
7.22 Adult Protection - % Of Referrals With
Decision Within 5 Days 60% 76.6% 77.8% 76.3% 81.7% 80.3%   GREEN 
7.23 % of Adult Protection Referrals Which Did
Not Go On To Investigation Or Other Service 50% 76.6% 74.2% 75.9% 71.5% 66.0%   GREEN 
9.4 Breakeven Position - Projected Outturn (NLC) >=0 3.014m
Underspend
4.304m
Underspend
3.112m
Underspend
£3.331m
underspend
£0.059m
underspend … … ...
9.6 Sickness Absence (NLC) - days lost per person 9.22 3.34 6.93 10.29 13.74 3.48   GREEN 
Page 176 of 214

Page 177

Appendix 2 – Areas for Improvement 
1.  Reablement and Rehabilitation  Target 2024/25 2023/24 Q4 2024/25 Q1 Performance
Compared to
Previous Quarter
Performance
Compared to Same
Quarter Previous
Year
RAG Status
Reablement - % Of New or Increased Home Support
Packages Which Are Reablement 70% 60.8% 61.1%   RED
Reablement - % Of People With No or Reduced Home
Support Service Required At End Of Process 70% 58.5% 62.6%   RED
Balance Of Care - % Of People (Age 65+) 45% 36.4% 37.1%   RED
Narrative & Corrective Action
Reablement / Home Assessment Team
Since the creation of HAT and at the end of Q1, there had been a total of 2119 referrals accepted by HAT, although the 110 referrals in June was a decrease from the 128
accepted in May. Over a rolling twelve months, Wishaw has accepted 25% of the total referrals, with Airdrie, Motherwell and Cumbernauld having between 18% and 22%
of the total. The proportion for Bellshill and Coatbridge is increasing as the teams develop.
It is of note that the number of referrals that have not been accepted has grown recently, with 60 referrals not being accepted in June.
The referrals by locality in the last year were:
Airdrie Bellshill Coatbridge Cumbernauld Motherwell Wishaw Total
254 98 103 283 238 331 1307
19% 7% 8% 22% 18% 25% 100% 
The hospitals where referrals originated from are shown in the table that follows. There is little difference in the proportionality from previous reporting. Those
categorised as “Other” represent older cases when a prior recording system was in use.
Monklands 979 46%
Wishaw 1071 51%
Other 69 3% 
As the data set develops, it is likely that a seasonal trend will emerge in the referral data, with variation during holiday periods.
Page 177 of 214

Page 178

The majority of referrals received related to females (60%), with the largest number in the age range 75-84 years old (40%).  Under 65s only accounted for 9% of referrals
and no referral referring to anyone under 18 was recorded. 
Input Services
Page 178 of 214

Page 179

The overwhelming majority of referrals to HAT have input services, i.e. a service is already in place at the time of the referral; 62% had 1 or 2 services and 35% had 3 or
more services. This is consistent across recent reporting and the average number of input services from HAT has only shown a slight increase over time. Overall, the
largest input service remains Home Support, followed by OT and this is fairly consistent. 
Outcomes
13% of people were re-admitted to hospital at the end of the HAT process. At the end of the HAT process, for those noted as reaching this stage, recordings show that
63% required no further service, with 37% noted as having at least 1 service. 
Page 179 of 214

Page 180

For those requiring further service, the service with the highest number was CAS., followed by Home Support Reablement and IRT (Physio). This figure will differ in the
future as ongoing service is being reconfigured to not include referrals being made to other service, such as NL Leisure.
Significant effort continues to be applied to reduce discharge delays and a more coordinated approach to the work of the Flow Boards and concise monthly planning
should see sustained impacts on overall system performance. This work is in preparation for Firebreak ’24, which is taking place during 16-25 September. 
A newly implemented Optimal Discharge Planning Target Operating Model (TOM) is now in place, designed to improve patient discharge experiences across all hospitals
in Lanarkshire and ensure that patients have a smooth and well-coordinated transition from hospital to home or other care settings, avoiding unnecessary delays and
improving overall outcomes.
The TOM introduces four Discharge Pathways to identify and address the specific discharge needs of each patient, ensuring that every step is tailored to their situation.
The Multidisciplinary Team (MDT) approach to be employed emphasises the importance of early and continuous discharge planning involving the entire MDT, ensuring all
patients receive the right care at the right time.
Partners have agreed on the key principles for effective discharge planning, which involves early patient and family engagement, detailed assessments, and proactive
arrangements to ensure a seamless discharge process. The overall goal is to make every discharge a positive experience for our patients, supporting their recovery and
reducing their time in hospital in line with our commitment to Patient-Centred Care.
Materials have been produced to support staff, including a video explaining the roles and responsibilities within the MDT and the activities that ensure timely and safe
discharges, team briefing sessions about the new Optimal Discharge Target Operating Model and a new Turas module on Optimal Discharge. 
Page 180 of 214

Page 181

2.  Adult Social Work Target 2024/25 2023/24 Q4 2024/25 Q1 Performance
Compared to
Previous Quarter
Performance
Compared to Same
Quarter Previous
Year
RAG Status
% Of Adult Protection Investigations Going To Initial Case
Conference 20% 11.9% 12.3%   RED
Narrative & Corrective Action
The overall number of Adult Protection referrals has decreased by 13% when compared with Q1 of 2023/24. A significant part of this overall decrease is due to a decrease
in the number of referrals from the Care Home sector, which fell 34% (from 367 to 204).
Despite this, Police and Health Adult Protection referrals have both increased; Police referrals have increased by 30% in comparison to Q1 of 2023/24 (94 to 121) and
Health referrals have increased by 15% (155 to 178). Some additional analysis may be required, as the number of Police adult concern reports have decreased
significantly; a decrease of 30% when compared with 2023/24 (1184 to 812). 
Adult Protection Referrals  Apr
2024
May
2024
Jun
2024
Total
Airdrie 46 44 40 130
Bellshill 38 43 36 117
Coatbridge 43 69 40 152
Cumbernauld 55 34 28 117
Motherwell 23 30 18 71
Wishaw 35 42 35 112
SWES 27 39 26 92
Total referrals received= 791 
Police Adult Protection Concern Reports Apr
2024
May
2024
Jun
2024
Total
Airdrie 59 71 40 170
Bellshill 35 35 19 89
Page 181 of 214

Page 182

Coatbridge 70 57 60 70
Cumbernauld 73 96 82 187
Motherwell 44 41 32 117
Wishaw 50 59 70 179
Total referrals received= 812 
Around 20% of all Adult Protection referrals were progressed as an inquiry with investigatory activity, however only 9% of inquires with investigatory activity went on to
progress to an initial case conference (13 total initial case conferences were held and 10 review case conferences).
Analysis of the referrals has highlighted that Community based referrals are more likely to progress to ASP investigation when compared to referrals from Care
Homes.  Referrals generated by Social Work and community partners often relate to multiple types of harm but our analysis has identified that self-neglect and hoarding
continue to rise; these cases are often complex and require a long-term, inter-agency response.
It is important to highlight that the NLC Social Work Adult Support and Protection procedures have been updated.  There are significant changes to the language used in
the procedures and describe how we now view ASP “Inquiries and investigations”.  The service now refers to initial inquires as ‘inquiries without investigatory activity’
and ASP investigations and ASP ‘Inquiry with investigatory activity’.  Importantly, investigatory activity involves any direct contact with the adult or their legal proxy and
as such, it is anticipated there will be a rise in investigatory activity, which will be reflected in future reports.
Internal audits of ASP records have identified discrepancies between the Social Work Information System and the Locality trackers submitted by senior social workers on
a weekly basis. Ongoing work will be completed with colleagues in localities to ensure that required information is recorded on SWIS, accurate records of Case
Conferences are stored in SWIS, and performance and management information is produced. 
Page 182 of 214

Page 183

North Lanarkshire Council
Report
Adult Care and Social Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    RM/MD/NL/LH Date 12/11/24 
Revenue & Capital Budget Monitoring Report: Adult Social Care
Period 06: 01/04/2024 to 13/09/2024 
From  Morag Dendy, Chief Officer (Planning, Performance and Quality Assurance)  
E-mail LynchN@northlan.gov.uk Telephone Nicola Lynch, Business Finance
Manager, 07581007187 
Executive Summary
This report provides a summary of the revenue financial performance of the Health & Social
Care Partnership (H&SCP) – North Lanarkshire (Adult Social Care & Housing) and the
financial performance of the Social Work capital programme.  
The report incorporates the period 1 April 2024 to 13 September 2024 (Period 06) and
includes projected outturn forecasts for the financial year ended 31 March 2025, with major
outturn variances highlighted and explained per the approved Financial Regulations.   
H&SCP – North Lanarkshire (Adult Social Care & Housing) has a gross revenue
expenditure budget of £268.341m and is currently projecting an underspend of £0.477m. 
This favourable variance is predominantly the result of the non-recurring underspend of
£6.9m on pension costs resulting from the reduced contribution rate to the Strathclyde
Pension Fund coupled with underspends due to vacancies. This is offsetting overspends
within overtime to compensate for the high vacancy levels as well as within Transport Costs
and Payments to Other Bodies. This underspend is positive movement of £0.206m since
the previous committee report resulting from reduced spend in Care Homes and Equipment
and adaptations. 
The Social Work capital programme has a total budget of £2.171m and is currently
projecting a breakeven position. 
Recommendations
It is recommended that the Adult Care and Social Work Committee:
(1) Acknowledge the revenue financial outturn position,
(2) Acknowledge the capital financial outturn position,  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 9
Page 183 of 214

Page 184

1. Background 
1.1 The Council approved its General Revenue Fund Budget on 15 February 2024, and
the Integration Joint Board (IJB) approved its Financial Plan on 27 March 2024.  The
approved Gross Expenditure Budget for the H&SCP – NL (Adult Social Care and
Housing) is £268.341m.    
1.2 The Council approved its new 5-year Strategic Capital Investment Programme on 14
March 2024.  Financial Year 2024/25 is the first year of the programme, with £2.200m
approved for Social Work for the current year.  Net reprofiling from 2023/24, results in
a revised budget of £2.171m, as demonstrated by Appendix 4. 
2. Report 
Revenue: Analysis of Significant Variances
2.1 Within Employee costs, the Service currently anticipates an underspend of £5.461m. 
This is in relation to the non-recurring reduction of employer’s superannuation costs,
coupled with slippage in relation to the recruitment of posts across the Service.  Both
of which being partially offset by higher than anticipated costs in relation to home
support staffing costs.
2.2 Transport and Plant is anticipated to be overspend by £0.573m.  This is mainly due to
higher than anticipated costs in relation to staff mileage, coupled with estimated running
costs associated with vehicles for use across the Service.
2.3 Payments to Other Bodies and Transfer Payments are detailed in Appendix 2.  This
expenditure accounts for £165.756m of the annual budget and is forecast to have an
in-year net overspend of £4.517m (2.7%).  This is primarily in relation to the Care at
Home sector who provide services to individuals via the SDS commissioning
framework.  These projections are demand led and are based on full year costs for both
current clients and those anticipated, therefore projections will alter as the year
progresses, updates will be provided in future reports.  
2.4 The Service anticipates a total over recovery of income of £0.081m.  An over-recovery
of £0.142m relates to returned private sector housing grants and recharge income from
other Council Services, these are both partially offset by an under-recovery of £0.145m
which is mainly as a result of lower than anticipated income from charges for
Community Alarms and Integrated Day Services.
Savings
2.5 The Financial Plan of the Health & Social Care Partnership was approved by the
Integrated Joint Board in March 2024 which identified an overall cost pressure for
2024/25 of £22.856m of which £11.4m relates to Adult Social Care.
2.6 To address this cost burden the service have developed a savings delivery plan which
aims to deliver this saving value over the two years 2024/25 and 2025/26.  In order to
spread these savings over 2 years the Service is using the non-recurring pension
underspend and reserves to offset the shortfall in year 1.  
2.7 The plan includes the following areas:
Page 184 of 214

Page 185

• Reducing current overspends to align with allocated budgets.
• Review of all Registered Social Landlords services in North Lanarkshire keeping
with the approach taken by other local authorities
• Review of all overtime and agency costs
• Review of non-traditional respite, advocacy and community services.
• Review of whole system approach to ensure that when people contact the services
the response is quick and effective, with a focus on helping people to help
themselves first.
• Review of all vacant posts.
2.8 Updates on these savings will be provided in future reports however Members should
note that the current projected underspend should continue to grow as progress
towards the achievement of these savings is made. 
Revenue: Earmarked Reserves
2.9 The Integration Joint Board have reserves of £24.804m for specific Adult Social Care
commitments as detailed in Appendix 3.  
2.10 It is anticipated that £4.257m of the earmarked reserves will be used during 2024/2.  As
detailed in section 2.6, this includes provision to offset the shortfall on savings. 
2.11 The remaining £20.547m will be carried forward to 2025/26.  Excluding the £12.151m
for Social Care Demand Risk, these reserves values have been assessed by the
service and set aside for the specific projects and initiatives detailed in Appendix 3. 
The demand risk value has been ear marked to offset any additional budget pressures
that may arise as well as any unanticipated increase in demand.  
2.12 All expenditure to be met from reserves are excluded from the outturn position. 
Capital: Analysis of Significant Variances
2.13 The Integrated Equipment and Adaptation (IEAS) capital programme funds equipment
for individuals and adaptations to properties to allow those individuals to live
independently at home.  The Service currently anticipates a breakeven position.  
2.14 Following on from the pandemic, there remain uncertainties in respect of demand and
complexity of need and therefore this budget will continue to be monitored closely, and
any forecast movements will be highlighted in future reports.
2.15 Appendix 5 outlines the Service’s total capital budget, outturn position and current
contractual commitments. 
3. Measures of success 
3.1  The Service operates within approved budget resources. 
4. Supporting documentation 
Appendix 1 Revenue – Subjective Analysis 
Appendix 2 Revenue – Payments to Other Bodies & Transfer Payments Analysis
Page 185 of 214

Page 186

Appendix 3 Revenue – Status of Earmarked Reserves  
Appendix 4 Capital – Budget Movements 2024/25 
Appendix 5 Capital – Summary Expenditure by Thematic Category     
Morag Dendy
Chief Officer (Planning, Performance and Quality Assurance) 
Page 186 of 214

Page 187

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The Adult Social Care management team will continue to review and implement
management action and initiatives, with the aim of remaining within approved budget
resources. This action will include vacancy management, curtailment of non-
essential expenditure, and maximising income.  This report has been prepared by
service-based Finance personnel in consultation with budget managers, in
accordance with the Financial Regulations. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
Page 187 of 214

Page 188

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
All activities undertaken by the Council are subject to risk, and in acknowledging the
Council’s approved Risk Management Strategy, Services manage these as part of
their overall corporate and service planning processes. The demands and
restrictions resulting from Covid, and the current economic climate has the potential
to impact upon the Council’s ability to provide quality services within approved
budget levels. 
The Service continues to face increasing demand pressures for provision within the
home support, self-directed support and independent care home arenas. To mitigate
these pressures the Service reviews and considers data and trends in relation to
current and anticipated demand on an ongoing basis to underpin projections of need
and cost, and to agree appropriate operational and management action. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 188 of 214

Page 189

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 189 of 214

Page 190

APPENDIX 1
[1] [2] [3] [5] [6] [7]
EMPLOYEE COSTS 90,648,940 85,187,814 5,461,126 FAV 6.0% (639,099) Anticipated underspend mainly as a result of the non-recurring reduction of employer's
Superannuation costs, coupled with slippage in relation to recruitment across the
Service. Both of which partially offset by higher than anticipated costs in relation to
home support staffing costs
PROPERTY COSTS 3,163,701 3,227,977 (64,276) ADV (2.0%) (11,749)
SUPPLIES & SERVICES 6,302,410 6,231,673 70,737 FAV 1.1% 279,310 Underspends in other Supplies areas, partially offset by overspends in equipment and
adaptations and small tools
TRANSPORT & PLANT 1,788,318 2,361,585 (573,267) ADV (32.1%) 77,995 Projected overspend in relation to Internal Transport charges and staff mileage costs
ADMINISTRATION COSTS 653,063 644,077 8,986 FAV 1.4% 112,927
PAYMENTS TO OTHER BODIES 59,583,474 60,470,970 (887,496) ADV (1.5%) 407,200 Please refer to Appendix 2 for analysis
TRANSFER PAYMENTS 106,173,176 109,803,216 (3,630,040) ADV (3.4%) (79,685) Please refer to Appendix 2 for analysis
CAPITAL FINANCING COSTS 0 0 0 0.0% 0
REVENUE FINANCING COSTS 0 0 0 0.0% 0
OTHER EXPENDITURE 28,858 19,161 9,697 FAV 33.6% 8,479
TOTAL EXPENDITURE 268,341,940 267,946,473 395,467 FAV 0.2% 155,378
NLC CONTRIBUTION (207,287,791) (207,287,791) 0 0.0% 0
NLC CONTRIBUTION - HOUSING (2,229,010) (2,229,010) 0 0.0% 0
INCOME FROM HEALTH (56,616,985) (56,698,186) 81,201 FAV (0.1%) (5,016)
FEES AND CHARGES (1,418,167) (1,272,937) (145,230) ADV 10.2% 49,815 Lower than anticipated income in relation to charges for Integrated Day Services and
Community Alarms
OTHER LOCAL AUTHORITIES 0 (3,528) 3,528 FAV 0.0% 0
BUDGETED USE OF IJB RESERVES 0 0 0 0.0% 0
OTHER INCOME (789,987) (932,263) 142,275 FAV (18.0%) 5,929 Overrecovery in relation to returned private sectors housing grants and recharge
income from other Council Services
INCOME (268,341,940) (268,423,714) 81,774 FAV (0.0%) 50,728
NET EXPENDITURE 0 (477,241) 477,241 FAV 0.0% 206,106
[4]
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Subjective Analysis
Period 06 (01 April 2024 - 13 September 2024)
Adult Social Care & Housing - INTEGRATED
CATEGORY ANNUAL
BUDGET
PROJECTED
OUTTURN
PROJECTED
OUTTURN VARIANCE % MOVEMENT VARIANCE ANALYSIS
Page 190 of 214

Page 191

APPENDIX 2
[1] [2] [3] [5] [6] [7]
SDS Framework 1 & 2 105,396,093 109,312,599 (3,916,506) ADV (3.7%) (79,536) Demand led activity.
Independent Care Homes 46,974,146 48,290,107 (1,315,961) ADV (2.8%) 361,233 Demand led activity.
Payments to NHS Lanarkshire 2,348,638 2,322,525 26,113 FAV 1.1% 24,769 Position reflects anticipated in year payments
Non Traditional Respite 335,283 101,645 233,638 FAV 69.7% 8,354 Position reflects anticipated Locality demand
Other Local Authorities - General 127,909 96,891 31,018 FAV 24.3% 20,238 Position reflects anticipated in-year demand
Voluntary Organisations & Payments to Other Bodies - Gen 8,304,417 8,174,373 130,044 FAV 1.6% 36,381 Position reflects anticipated in-year demand
Housing Support (RSL's) 777,083 490,617 286,466 FAV 36.9% (149) Position reflects projected contract levels
Locality Flexibility 218,068 214,659 3,409 FAV 1.6% (668) Position reflects anticipated Locality demand
Private Sector Housing Grants 1,152,378 1,156,571 (4,193) ADV (0.4%) (51,543) Position reflects anticipated in-year demand
Medical Fees 122,635 114,200 8,436 FAV 6.9% 8,435 Position reflects Service's approach to absence management
Other 0 0 0 0.0% 0
TOTAL EXPENDITURE 165,756,650 170,274,186 (4,517,536) ADV (2.7%) 327,515
[4]
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Payments to Other Bodies & Transfer Payments Analysis
Period 06 (01 April 2024 - 13 September 2024)
Adult Social Care & Housing - INTEGRATED
CATEGORY ANNUAL
BUDGET
PROJECTED
OUTTURN
PROJECTED
OUTTURN % MOVEMENT VARIANCE ANALYSIS
Page 191 of 214

Page 192

APPENDIX 3
Contract Monitoring Staff 87,351 74,279 13,072 0 87,351
22/23 Saving: Muirpark 27,485 19,533 7,952 0 27,485
Carers Act 2018 - Support 2,595,745 364,226 2,231,519 0 2,595,745
Social Care Demand risk 12,682,932 531,933 12,150,999 0 12,682,932
Tech digitial Improvements 389,719 122,829 266,890 0 389,719
Increase Advocacy provider 65,667 65,667 0 0 65,667
Discharge to assess/ PDD 109,196 54,257 54,939 0 109,196
Adapations Funding 308,571 308,571 0 0 308,571
Tech Improvements - SWIS 700,000 60,920 639,080 0 700,000
Tech Improvements - Comm Alarms 464,604 33,600 431,004 0 464,604
Tech Improvements - Home Scheduling System 3,698,423 302,393 3,396,030 0 3,698,423
Adult Protection Contribution 50,000 38,299 11,701 0 50,000
MH 2 NL10s 161,633 61,824 99,809 0 161,633
Cost of Living Helpline 359,993 264,904 95,089 0 359,993
HS resilience 656,188 272,853 383,335 0 656,188
Staff Training Academy "grow your own" 1,128,466 413,563 714,903 0 1,128,466
Building Capacity Funding Across The Ip Sector (part of Business Case) 0
The Winter Planning & Enhanced supports Business Case
TOTAL 24,804,931 4,257,377 20,547,554 0 24,804,931
1,318,958 1,267,726 51,232 1,318,958
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Status of Earmarked Reserves
Period 06 (01 April 2024 - 13 September 2024)
Adult Social Care & Housing - INTEGRATED
TOTALDESCRIPTION OF EARMARKED RESOURCE
Approved
Reserve Total
as at 1 April 2024
2024/25 2025/26 No Longer
Required
Page 192 of 214

Page 193

APPENDIX 4
Approved: Year 1 budget (5 year Capital Program 2024/25 to 2028/29) 2,200,000
Reprofiling from 2023/24 (28,677) Included in opening budget Social Work Key Ambition Integrated equipment & adaptations
REVISED CAPTIAL BUDGET 2024/25 2,171,323 0 0 0
Theme
NORTH LANARKSHIRE COUNCIL
Capital Budget Monitoring Report - Budget Movements 2023/24
Period 06 (01 April 2024 - 13 September 2024)
Social Work Capital Programme
BUDGET MOVEMENTS 2024/25 £ Period Division Thematic
Category
Page 193 of 214

Page 194

APPENDIX 5
Social Work:
Integrated Equipment and
Adaptations
2,171,323 624,311 782,503 1,388,820 2,171,323 (0)
TOTAL 2,171,323 624,311 782,503 1,388,820 2,171,323 (0)
NORTH LANARKSHIRE COUNCIL
Capital Budget Monitoring Report - Summary Expenditure by Thematic Category
Period 06 (01 April 2024 - 13 September 2024)
Social Work Capital Programme
UNCOMMITTED FINAL
OUTTURN
OUTTURN
VARIANCETheme BUDGET ACTUAL COMMITTED
Page 194 of 214

Page 195

North Lanarkshire Council
Report
Adult Care and Social Work Committee 
Does this report require to be approved? ☒ Yes ☐ No
Ref: NLC-CPT-24-042 Date: 12 November 2024 
Contract Award for Independent Advocacy (Adults) 
From    Morag Dendy, Chief Officer (Performance, Planning, and Quality Assurance) 
E-mail  DendyM@northlan.gov.uk Telephone:  07939280915 
Executive Summary 
The Adult Care and Social Work Committee is asked to approve the award of a contract for
Independent Advocacy Services (Adults) (the ‘Agreement’) to Equal Say Limited. 
The Agreement is for an initial period of 36 months anticipated to commence on 1 March 2025. The
council reserves the right to extend the Agreement for additional periods up to a maximum of a
further 24 months. 
The value of the Agreement is Three Million, Five Hundred and Seven Thousand, Four Hundred-
and Five-pounds Sterling (exclusive of VAT). 
Recommendations 
It is recommended that the Adult Care and Social Work Committee: 
(1) Approves the award of the Agreement to Equals Say Limited at the value of pounds Sterling
(£3,507,405) exclusive of VAT. 
The Plan for North Lanarkshire 
Priority Enhance participation, capacity, and empowerment across our
communities
Ambition Statement (13) Improve preventative approaches including self-management and
giving people information and choice over supports and services
Programme of Work Resilient People 
1. Background 
1.1 The contract supports the Council to fulfil its statutory obligations for the provision of
advocacy services. The Mental Health (Care and Treatment) Act (Scotland) 2003 imposed a
Item 10
Page 195 of 214

Page 196

duty on local authorities and health boards to collaborate to ensure the availability of
independent advocacy services within their area. The Act gives everyone with mental illness,
learning disability, dementia and other related conditions the right to access independent
advocacy support. The Mental Health (Scotland) Act 2015 builds on the rights enshrined
within the 2003 Act to widen access to independent advocacy support.
1.2 Independent advocacy supports people to have their voices heard and their rights and 
interests protected. Independent advocacy is a positive force in influencing social change, 
with the work and ethos of advocacy underpinned by a person-focused and human rights 
framework. The importance and benefits of independent advocacy are now widely 
recognised and woven into the fabric of health and social care provision and legislation in 
Scotland.  Advocacy for carers and for people affected by drug and alcohol misuse will be 
incorporated into the requirements of the new contract.   
1.3. The Agreement is for a single contractor to deliver the following objectives:
• Independent advocacy core service  
• Independent advocacy for carers  
• Independent advocacy for people affected by substance and alcohol misuse 
• Independent advocacy for prisoners in HMP Shotts 
1.4. The Procurement process sought to identify advocacy focused organisations with an ethos
and approach to support people to have their voices heard and their rights and interests
protected. 
1.5. This was achieved through quality procurement questions, with shortlisted bidder’s
responses being assessed by experienced evaluators. Included in the process was an
element of evaluation by people with lived experience. Reference to model responses were
developed to assist evaluators in determining the quality of responses received from bidders. 
1.6. The lived experience panel consisted of lay members who have directly interacted with the
services previously. The panel were fully briefed on the procurement process and the
importance of their role within that. Due diligence was followed to ensure people had the
capacity and understanding to take part in the evaluation exercise. Bidders were asked to
deliver a 10-minute presentation to the panel. Panel members were able to ask clarification
questions at the end of the presentations. This method of evaluation added value to the
exercise and ensured achievement of best value in the next generation of this contract. 
1.7. The current contract was reviewed in February 2024 and concluded that independent
advocacy services are required.  North Lanarkshire Council wish to continue the success of
current delivery and improve upon it in the new contract. 
1.8. The requirements within the Agreement are currently under contract with Equal Say Ltd and
Equals Advocacy Ltd [previously tendered on a two Lot basis for provision of advocacy for
adults [aged 16-64] and for older adults [aged over 65] This arrangement is due to expire on
28 February 2025.  The Agreement detailed within this report will supersede it. 
2. Report 
2.1 A group of technical and procurement representatives was formed to develop and agree the
procurement strategy for the Agreement to enable the council to achieve maximum benefit
for the requirements. Page 196 of 214

Page 197

2.2 The initial estimated value of the Agreement dictated that the procurement procedure be
undertaken in accordance with the Public Contracts (Scotland) Regulations 2015. An advert
for the procurement opportunity was published on the Public Contracts Scotland and the UK
Find a Tender (FTS) website. 
2.3 The procurement procedure was undertaken as an “Open Procedure”. Invitation to Tender
documentation published by the council received a total interest from three companies with
the council receiving three tender submissions. 
2.4 Based on the evaluation criteria and scoring methodology set out in the invitation to tender
package within the procurement procedure, an evaluation of tender responses received was
completed by members identified by the UIG. Selection stage responses were assessed first
and compliant tenderers that satisfied / declared that they met the published minimum
selection stage criteria progressed to the award stage evaluation. Following identification of
the recommended tenderer(s), their selection stage responses were assessed in more detail
to ensure they satisfied the minimum selection stage criteria applied 
2.5 This recommendation to award the Agreement follows the completion of a procurement
procedure where Equal Say Limited has been evaluated as demonstrating Best Value for the
council. 
2.6 Appendix 1 confirms the scoring achieved by each tenderer, further details of the
procurement procedure is provided in Appendix 2 and the SME status and location of all
tenderers is located within Appendix 3. 
Financial / Budget Consideration 
2.7 The pre-tender whole life estimate budget for the Agreement was £3,507,405. Following
completion of the procurement procedure, the value of the Agreement to be awarded is Three
Million Five Hundred and Seven Thousand Four Hundred and Five pounds (£3,507,405)
exclusive of VAT. 
2.8  The costs associated with delivery of the Agreement will be contained within the Revenue
budget for Adult Social Work. 
Price Stability 
2.10 The cost is broken down into Direct and Indirect Costings therefore demonstrates the various
elements for which the budget is being utilised to deliver the Contract. The maximum budget
is £701,481 per year excluding VAT and cannot exceed this budget amount. Provider’s
proposal is within the budget. 
Community Benefits 
2.11 The council is committed to maximising the delivery of community benefits. The procurement
included a community benefit requirement, this approach is designed to deliver local
community benefits where possible. 
2.12 Within their tender, Equal Say Limited committed to deliver the following community benefits
within the Agreement: Page 197 of 214

Page 198

Community Benefit Type Quantity
Committed
New Job for an Individual not from a Priority Group (Full Time) 2
Educational Visits 9       
2.13 The community benefits delivered as part of the Agreement includes/does not include the
creation of jobs or apprenticeships. 
Fair Work First  
2.14 Within their tender submission, Equal Say Limited have demonstrated commitment to the
Scottish Governments “Fair Work First” initiative, such as being an accredited Living Wage
employer, have no zero-hour contracts unless requested by staff, a wide range of employee
benefits and an environment where staff voice is sought, represented, and responded to.
Equal Say Limited are committed to comprehensive staff training as well as continuous
professional development. Equal Say Limited commit to flexible working and family friendly
working practices, are committed to fair work practices and actively promote equality and
diversity. 
2.15 Equal Say Limited have the bronze award from NLC, reflecting recognition that they are
consistent in following the four pillars of the scheme. 
Contract Management 
2.16 Officers from Quality Assurance and Adult services will be responsible for managing the
Agreement which will be undertaken in accordance with the contract and supplier
management conditions applied within the Agreement. 
3. Measures of success 
3.1 The Agreement will deliver the following outcomes; 
• Persons have their wishes, views, values and preferences considered within any
decision-making processes.
• Persons have their human, legal and other rights safeguarded, and others, involved
in the care and support of such Persons will be aware of the centrality of such rights
• Persons feel able to have some ownership and involvement in shaping the service
• Persons feel supported to address stigma, combat discrimination and feel that the
service promotes their inclusion through the development of promotional strategies.
• Persons using the service will have a wider understanding of the services and
treatment that is available to them.  
• Persons using the service will have increased understanding of the rights that the
Carers Act conveys, and how to claim them. 
Page 198 of 214

Page 199

3.2 Best Value has been considered to be demonstrated by Equal Say Limited. 
4. Supporting documents 
4.1 Appendix 1 Summary of Tender Evaluation Process
4.2 Appendix 2 Summary of Procurement Process
4.3 Appendix 3 SME Status and Location of All Tenderers 
Morag Dendy
Chief Officer (Performance, Planning & Quality Assurance) 
Page 199 of 214

Page 200

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
All contracted providers required to pay SLW. 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Budget allocation/value has been agreed for the duration of the contract. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Procurement of services related to our obligations to ensure Advocacy Provision is
available.  The exercise is to re-tender services where the contract is due to end. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data? 
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☒ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-mailed
to dataprotection@northlan.gov.uk 
Yes ☒ No ☐
5.6 Technology / Digital impact
Page 200 of 214

Page 201

Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts, highlighting
where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk
Registers), and how they are managed? 
If services are not procured, we will not be able to fulfil our obligations in ensuring
Advocacy Provision is available.  All risks relating to provider sustainability are held on
the service risk register. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does
it relate to healthcare, housing, or education services for in-Service or ex-Service
personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to ensure
there has been appropriate consideration of the particular needs of the Armed Forces
community to make sure that they do not face disadvantage compared to other citizens in
the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service delivery,
policy, or plan that has an impact on children and young people up to the age of 18, or on
a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles from the
United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been carried
out? 
Yes ☐ No ☐  
Page 201 of 214

Page 202

Appendix 1 – Summary of Tender Evaluation Process 
Final
Rank Tenderer Name Total Tender
Score (%)
Recommended
for Award      
(Yes / No)
1 Equals Say Limited 79.00% Yes
2 The Advocacy Project 68.80% No
3 VoiceAbility Advocacy 60.80% No                             
Page 202 of 214

Page 203

Appendix 2 – Summary of Procurement Process 
Response
CPT Contract Reference Allocated: NLC-CPT-24-042
Procurement Procedure Utilised: Open Procedure
Governing Legislation / Regulations: Public Contracts (Scotland) Regulations 2015
Date Contract Strategy Approved: 22 August 2024
Tender Platform Utilised: PCS-Tender (PCST)
Date Contract Notice Published: 09 September 2024
Total Expressions of Interest Received: Three
NLC Based Expressions of Interest: 
Tender Return Deadline: 30 September 2024
Number of Tenders Received: Three
Tenders from SME’s: 3
Tenders from NLC Based Tenderers:  1
Tenders from Supported Businesses: 0
Number of Non−compliant Tenders: 0
Number of Compliant Tenders: 3
Number of Recommended Tenderers: 1
Basis of Award: Quality: 80% Price: 20%
Evaluation Team: Adult Health & Social Care staff
Anticipated Start Date of the Agreement: 01 March 2025
Total Agreement Period (Months): 60
Awarded Value of the Agreement: £ 3,507,405.00 
Page 203 of 214

Page 204

Appendix 3 – SME Status and location of all Tenderers 
Name of Tenderer
Size of Tendering
Organisation
(Micro, Small,
Medium or Large)
Location
(Local Authority /
Council Area)
Equals Say Limited Micro North Lanarkshire
The Advocacy Project Medium United Kingdom
VoiceAbility Advocacy Medium Greater Glasgow   
Page 204 of 214

Page 205

North Lanarkshire Council
Report
Adult Care and Social Work 
Does this report require to be approved? ☒ Yes ☐ No
Ref: NLC-CPT-24-046 Date: 12 November 2024 
Contract Award for Mental Health Peer Support and Short-Term Mental
Health Support Service 
From  Diane Fraser, Chief Officer (Adult Social Work Services) 
E-mail breena@northlan.gov.uk Telephone: 07939281050 
Executive Summary 
The Adult Care and Social Work Committee is asked to approve the award of a contract for Mental
Health Peer Support and Short-Term Mental Health Support Service (the ‘Agreement’) to Lot 1
Scottish Association for Mental Health (SAMH) and Lot 2 Scottish Association for Mental Health
(SAMH). 
The Agreement is for an initial period of 36 months anticipated to commence on 01 February 2025.
The council reserves the right to extend the Agreement for additional periods up to a maximum of a
further 12 months. 
The maximum value of the Agreement is Three Million Eighty-One Thousand Two Hundred and Four
Pounds Sterling (£3,081,204) exclusive of VAT. 
Recommendations 
It is recommended that the Adult Care and Social Work Committee: 
(1) approves the award of the Agreement to Scottish Association for Mental Health (SAMH) at the
value of Three Million Eighty-One Thousand Two Hundred and Four Pounds Sterling
(£3,081,204) exclusive of VAT. 
The Plan for North Lanarkshire 
Priority Improve the health and wellbeing of our communities
Ambition Statement (13) Improve preventative approaches including self-management and
giving people information and choice over supports and services
Programme of Work Resilient People 
1. Background 
1.1 To identify and procure a mental health and wellbeing service that provides support to
Item 11
Page 205 of 214

Page 206

residents of North Lanarkshire experiencing mental health challenges. The service will be
instrumental in ensuring that North Lanarkshire Council meets it statutory duties in
accordance with the Mental Health (Care and Treatment) (Scotland)Act 2003 and the
requirements of the Scottish Government as outlined in the Mental Health Strategy 2017-
2027.  The service will assist with recovery via a Peer Support model and prevent/ support
hospital admission and discharge via a short-term crisis service.
1.2.   The demand for such services is widely acknowledged both locally and nationally. According
to the ‘The Scottish Health Survey 2022- volume 1: main report – Gov.Scot ‘  one in three
people in Scotland is affected by mental health problems in any one year. Further, that levels
of deprivation experienced by an individual correlate with increased likelihood of developing
poor mental health.
1.3.  The Agreement is structured into two Lots: Lot 1 Peer Support Service with Information and
Lot 2 Short-Term Support Service. 
1.4. The objectives of the service for Lot 1 – Peer Support Service with Information Service & Lot
2 – Short-Term Support Service. are to:
• The development of a service offering recovery and inclusive support through crisis and
short support to those residing in North Lanarkshire over the age of 16 years.
• Short-term support may include the prompting and support to individuals to adhere to
prescribed medications. 
• The development of a service offering peer support, advice, information, and
signposting to relevant resources.
• The development of an integrated approach to information sharing and planning
between the Contractor and health and social care staff. Referral is only made with the
consent of the person being referred (or their Guardian/’Power of Attorney’, where
relevant).
• Personalised support for individuals to take control of their lives.
• The provision of a responsive and flexible services and support for those experiencing
mental health difficulties in North Lanarkshire.
1.5.  The Procurement process sought to identify mental health and peer support focused
organisations with an ethos and approach to preventative and anticipatory support. 
1.6 This was achieved through quality procurement questions, with shortlisted bidder’s
responses being assessed by experienced evaluators. Included in the process was an
element of evaluation by people with lived experience. Reference to model responses were
developed to assist evaluators in determining the quality of responses received from bidders. 
1.7 The lived experience panel consisted of lay members who have directly interacted with the
services previously. The panel were fully briefed on the procurement process and the
importance of their role within that. Due diligence was followed to ensure people had the
capacity and understanding to take part in the evaluation exercise. Bidders were asked to
deliver a 10-minute presentation to the panel. Panel members were able to ask clarification
questions at the end of the presentations. This method of evaluation added value to the
exercise and ensured achievement of best value in the next generation of this contract. 
1.8.  The current contract was reviewed in June 2024 and concluded that both peer support and
short-term recovery services are required.  North Lanarkshire Council wish to continue the
success of current delivery and improve upon it in the new contract. 
1.9. The requirements within the Agreement are currently under contract with Scottish Association
for Mental Health. This arrangement is due to expire on 31 January 2025 with the Agreement
detailed within this report due to supersede it. Page 206 of 214

Page 207

2. Report 
2.1 A group of technical and procurement representatives was formed to develop and agree the
procurement strategy for the Agreement to enable the council to achieve maximum benefit
for the requirements. 
2.2 The initial estimated value of the Agreement dictated that the procurement procedure be
undertaken in accordance with the Procurement (Scotland) Regulations 2016. 
2.3 The procurement procedure was undertaken as an “Open Procedure”. Invitation to Tender
documentation published by the council received a total interest from five companies with the
council receiving three tender submissions. 
2.4 Based on the evaluation criteria and scoring methodology set out in the invitation to tender
package within the procurement procedure, an evaluation of tender responses received was
completed by members identified by the UIG. Selection stage responses were assessed first
and compliant tenderers that satisfied / declared that they met the published minimum
selection stage criteria progressed to the award stage evaluation. Following identification of
the recommended tenderer(s), their selection stage responses were assessed in more detail
to ensure they satisfied the minimum selection stage criteria applied 
2.5 This recommendation to award the Agreement follows the completion of a procurement
procedure where SAMH has been evaluated as demonstrating Best Value for the council. 
2.6 Appendix 1 confirms the scoring achieved by each tenderer, further details of the
procurement procedure is provided in Appendix 2 and the SME status and location of all
tenderers is located within Appendix 3. 
Financial / Budget Consideration 
2.7 The pre-tender whole life estimate budget for the Agreement was £3,081,204. Following
completion of the procurement procedure, the value of the Agreement to be awarded is Three
Million Eighty-One Thousand Two Hundred and Four Pounds Sterling (£3,081,204) exclusive
of VAT
2.8 Some costs savings over the life of the contract will be achieved by dovetailing support
options with the additional resource allocated to the Community & Voluntary Sector to
support mental health and wellbeing. By reducing the intervention period and directing
people to existing local community supports, we are able to reduce the allocation to this
provision.
2.9 The costs associated with delivery of the Agreement will be contained within the Revenue
budget for Adult Social Work. 
Price Stability 
2.10 The cost is broken down into Direct and Indirect Costings therefore demonstrates the various
elements for which the budget is being utilised to deliver the Contract. The maximum budget
is £770,301 per year excluding VAT and cannot exceed this budget amount. Provider’s
proposal is within the budget.   
Page 207 of 214

Page 208

Community Benefits 
2.11 The council is committed to maximising the delivery of community benefits. The procurement
included a community benefit requirement, this approach is designed to deliver local
community benefits where possible. 
2.11.1 Within their tender, SAMH committed to deliver the following community benefits within the
Agreement:  
Community Benefit Type Quantity
Committed
Lot 1 Educational Visits 4
Lot 1 Work Experience Placements for an Individual 16+ years of age 4
Lot 1 Non-Financial Support for a Community Project / Organisation 4
Lot 1 Business Mentoring and Advice to Support SME / Social Enterprise /
Voluntary Organisation 
Lot 2 Educational Visits 4
Lot 2 Work Experience Placements for an Individual 16+ years of age 4
Lot 2 Non-Financial Support for a Community Project / Organisation 4
Lot 2 Business Mentoring and Advice to Support SME / Social Enterprise /
Voluntary Organisation  4 
2.11.2 The community benefits delivered as part of the Agreement includes / does not include the
creation of jobs or apprenticeships. 
Fair Work First  
2.12 Within their tender submission, SAMH demonstrated commitment to the Scottish
Governments “Fair Work First” initiative, such as being an accredited Living Wage employer,
have no zero-hour contracts unless requested by staff, a wide range of employee benefits
and an environment where staff voice is sought, represented, and responded to. SAMH are
committed to comprehensive staff training as well as continuous professional development.
SAMH commit to flexible working and family friendly working practices, are committed to fair
work practices and actively promote equality and diversity. 
Contract Management 
2.13 Officers from Adults and Quality Assurance will be responsible for managing the Agreement
which will be undertaken in accordance with the contract and supplier management
conditions applied within the Agreement. 
3. Measures of success 
The Agreement will deliver the following outcomes. 
• supporting individuals with severe and enduring mental health issues
• prevent avoidable hospital admissions  Page 208 of 214

Page 209

• advance positive mental health by collaborating with medical, Social Work and other
professionals by applying recovery principles. 
3.1 Best Value has been considered to be demonstrated by SAMH. 
4. Supporting documents 
4.1 Appendix 1 Summary of Tender Evaluation Process
4.2 Appendix 2 Summary of Procurement Process
4.3 Appendix 3 SME Status and Location of All Tenderers 
Diane Fraser
Chief Officer (Adult Social Work) 
Page 209 of 214

Page 210

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
All providers required to pay SLW. 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The budget allocation/values have been agreed for the duration of the contract. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data? 
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☒ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-mailed
to dataprotection@northlan.gov.uk 
Yes ☒ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Page 210 of 214

Page 211

Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts, highlighting
where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk
Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does
it relate to healthcare, housing, or education services for in-Service or ex-Service
personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to ensure
there has been appropriate consideration of the particular needs of the Armed Forces
community to make sure that they do not face disadvantage compared to other citizens in
the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service delivery,
policy, or plan that has an impact on children and young people up to the age of 18, or on
a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles from the
United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been carried
out? 
Yes ☐ No ☐  
Page 211 of 214

Page 212

Appendix 1 – Summary of Tender Evaluation Process 
Final
Rank Tenderer Name Total Tender
Score (%)
Recommended
for Award      
(Yes / No)
1 Lot 1 SAMH 90.20% Yes
2 Lot 1 Lanarkshire Association for Mental Health 82.20% No
3 Lot 1 Penumbra 79.20% No    
1 Lot 2 SAMH 97.20% Yes
2 Lot 2 Lanarkshire Association for Mental Health 94.20% No
3 Lot 2 Penumbra 89.20% No             
Page 212 of 214

Page 213

Appendix 2 – Summary of Procurement Process 
Response
CPT Contract Reference Allocated: NLC-CPT-24-046
Procurement Procedure Utilised: Open Procedure
Governing Legislation / Regulations: Public Contracts (Scotland) Regulations 2015
Date Contract Strategy Approved: 20 August 2024
Tender Platform Utilised: PCS-Tender (PCST)
Date Contract Notice Published: 23 August 2024
Total Expressions of Interest Received: 5
NLC Based Expressions of Interest: 
Tender Return Deadline: 01/10/2024
Number of Tenders Received: 3
Tenders from SME’s: 3
Tenders from NLC Based Tenderers:  3
Tenders from Supported Businesses: 0
Number of Non−compliant Tenders: 0
Number of Compliant Tenders: 3
Number of Recommended Tenderers: 1
Basis of Award: Quality: 80% Price: 20%
Evaluation Team: Adult Social Work Services Staff
Anticipated Start Date of the Agreement: 01 February 2025
Total Agreement Period (Months): 48
Awarded Value of the Agreement: £3,081,204 
Page 213 of 214

Page 214

Appendix 3 – SME Status and location of all Tenderers 
Name of Tenderer
Size of Tendering
Organisation
(Micro, Small,
Medium or Large)
Location
(Local Authority /
Council Area)
Scottish Association for Mental Health (SAMH) Micro North Lanarkshire
Lanarkshire Association for Mental Health  Micro North Lanarkshire
Penumbra Mental Health Services  Micro North Lanarkshire   
Page 214 of 214