Democracy Spraffa

Agenda Document Pack - Adult Care and Social Work Committee - 03/09/2024

North Lanarkshire Council · 3 September 2024
Back to Adult Care and Social Work Committee — 3 September 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

23 August 2024 
Members of the 
Adult Care and Social Work Committee
Chief Executive’s Office
Archie Aitken
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk 
Notice is given that a Meeting of the Adult Care and Social Work Committee is to be held in the Council Chamber, Civic
Centre, Windmillhill Street, Motherwell, ML1 1AB on Tuesday, 03 September 2024 at 14:00 PM which you are requested to
attend. 
The agenda of business is attached. 
Archie Aitken
Chief Officer (Legal & Democratic) 
Members : 
Clerk Name: Clare Louise McDonald
Clerk Telephone: 01698 302190
Clerk Email: mcdonaldcl@northlan.gov.uk 
M McCulloch, A McCrory, D Ashraf, C Barclay, B Baudo, M Boyd, G Brennan, B Burgess, A Bustard, J Cairns, W Goldie, J
Jones, K Larson, M McBride, B McCulloch, R McKendrick, C McManus, A McVey, N Shevlin, L Stubbs, R Sullivan, J
Toner, C Williams, N Wilson, G Woods.  
Page 1 of 100

Page 2

Page 2 of 100

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical Standards In Public
Life Etc. (Scotland) Act 2000   
Operational   
2 Update on Self-Directed Support in North Lanarkshire
Submit report by the Chief Officer (Adult Social Work Services) providing an
update on the progressive implementation of Self Directed Support
(SDS) nationally and locally. 
5 - 14 
3 Home Support Service
Submit report by the Chief Officer (Adult Social Work Services) providing an
update on progress on the implementation of the redesign of the Home
Support Service. 
15 - 28 
4 Community Alarm Service
Submit report by the Chief Officer (Adult Social Work Services) providing an
update on the Community Alarm Service. 
29 - 54 
5 Home Assessment Team/Discharge without Delay Programme
Update
Submit report by the Chief Officer (Adult Social Work Services) providing an
update on the Home Assessment Team/Discharge without Delay Programme in
line with the national development of Home First. 
55 - 68  
Performance   
6 Adult Social Care Performance Report - Quarter 4 - 1 January to 31
March 2024
Submit report by the Chief Officer (North Lanarkshire Health and Social Care
Partnership)  providing an update on the performance of key areas of
activity within Adult Health and Social Care for the period 1 January to 31 March
2024 (Quarter 4) 
69 - 82  
Financial   
7 Revenue and Capital Monitoring Report: Adult Social Care from 1
April to 21 June 2024 - Period 3
Submit report by the Chief Officer (Planning, Performance and Quality Assurance)
providing a summary of the revenue financial performance of the Health and
Social Care Partnership (H&SCO) - North Lanarkshire (Adult Social Care and
Housing) and the financial performance of the Social Work Capital Programme for
the period 1 April to 21 June 2024 - Period 3 
83 - 94 
8 Sundry Debt Write Off 2024
Submit report by the Chief Officer (Adult Social Work Services) summarising
outstanding debtor accounts, deemed uncollectable following all attempts at
recovery or considered uneconomically viable to continue pursuing. 
95 - 100 
Page 3 of 100

Page 4

Page 4 of 100

Page 5

North Lanarkshire Council
Report
Adult Care and Social Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    DF/AB/LB/AMCG Date 03/09/24 
An Update on Self-Directed Support in North Lanarkshire 
From  Diane Fraser, Chief Officer / Head of Service (Adult Social Work Services)  
E-mail FraserDi@northlan.gov.uk Telephone 07583 114596 
1. Background 
1.1 Self-Directed Support in Scotland has its origins in North Lanarkshire. The opportunity
to maximise choice and control for people and their families was recognised locally as
far back as 2007 where concepts and approaches were tested on a small scale and
evaluated through Lancaster University and form the basis of the work being done
today. 
Executive Summary 
This report provides an update on the progressive implementation of Self-Directed
Support (SDS) nationally and the position locally with reference to the Self-Directed
Support Framework of Standards updated by Social Work Scotland in May 2024.
The report will reinforce the whole system approach to continuing to promote
maximum choice and control for people living in North Lanarkshire. 
Recommendations
It is recommended that the Adult Care and Social Work Committee: 
(1) Acknowledge the progress made in North Lanarkshire to promote choice and control
through Self-Directed Support
(2) Note that a future report will be brought to detail the findings of a Self-Evaluation and
associated Action Plan. 
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement
(12) Ensure our residents are able to achieve, maintain, and
recover their independence through appropriate supports at home
and in their communities
Programme of Work Resilient People
Page 5 of 100

Page 6

1.2 Early drivers of a more personalised approach, including individualising funding to
promoting choice and control, recognised the increasing gap between assessed need
for support services and available resources to deliver. At the time it was noted that
there was a risk of being pushed down a route that limited access to resources to meet
critical and substantial need only, missing the opportunity to intervene more proactively
and prevent difficulty or crisis arising. 
1.3 The fiscal challenges of today being experienced at a system wide level; within specific
services and across the range of provision; and for individual people and their families;
make the original drivers for change even more important. A whole system approach
is being progressively implemented to mitigate as far as possible, the impact of
demographic change, cost of living challenges, workforce pressures and shared
pressures across health services. 
1.4 A personalised approach, which includes the individual allocation of financial resource
where that is needed, remains the preferred operating model for the whole system in
North Lanarkshire and is being supported by some key actions described in the report. 
2. Report 
Legislation and National context 
2.1 The Self-Directed Support (Scotland) Act 2013 promotes equality, autonomy and
improves lives for people who need support. It is a crucial piece of legislation for
children, adults and carers in Scotland, emphasising choice, control, and dignity in care
and support. 
2.2 Since the act was implemented in April 2014 both the Care Inspectorate and Audit
Scotland have produced reports on Self Directed Support stating that whilst there is
evidence of positive progress, there is an inconsistency of practice and process across
Scotland (Care Inspectorate Thematic Review of self-directed support in Scotland:
Transforming Lives June 2019; Audit Scotland 2017 progress report Self-directed
Support) 
2.3 In March 2021 the national framework of eleven standards for the implementation of
Self-directed Support was developed and published by Social Work Scotland. The
standards and action statements were developed to ensure consistency of outcomes
and approaches in SDS practice across Scotland experienced by supported people
(children and adults) and carers, building up a framework of good practice in
assessment for support, support planning and in provision of care and support
resources. The framework of standards was then updated in 2022 to become 12
standards and has been updated again in May 2024. 
2.4 The foundation of the framework of standards is that Self-directed Support is not new
or something to learn, it is not about resource allocation frameworks, and it is not only
about an offer of the four SDS options. Crucially, SDS is about the implementation of
core social work/practitioner values of human rights and relationships in practice, and
it empowers social workers/practitioner to be autonomous in exercising their
professional judgement, and using their own knowledge, skills and abilities, in
partnership with supported people. The alignment of the framework of standards with
the approach in North Lanarkshire reflects the direct involvement of key officers in their
design and development.
Page 6 of 100

Page 7

2.5 Alongside the development of the standards, Social Work Scotland are finalising the
format of self-evaluation to inform local improvement plans. As enthusiastic early
adopters of this approach, it is the intention to work with all local stakeholders to
undertake a self-evaluation in late summer / autumn. Honest reflection on strengths
and challenges will define clear actions which are expected to maintain and strengthen
the whole system approaches to promoting choice and control in North Lanarkshire. 
North Lanarkshire Profile
2.6 In 2024/25 3,029 people benefited from support arranged through the principles of self-
directed support. The adults, children, young people and their families, were able to
excerpt choice and control through understanding the resource available to them and
making decisions about how best to use that resource to support the achievement of
their outcomes.
2.7 Information provided to Public Health Scotland as part of the Annual Return Summary
demonstrates the spread across ages in Figure 1 below. 
Figure 1 
2.8 The individual budgets put in place are outlined below in the number of people opting
to manage a direct payment, direct their own support or have the local authority put
arrangements in place. Figure 2 offering the detail of the numbers of people across
localities and Figure 3 providing the financial information.
Figure 2 
Page 7 of 100

Page 8

Figure 3 
2.9 As previously reported to Committee Mosaic will replace SWIS as the line of business
operating platform. The design work is taking into account the benefits of enhanced
data analysis and significantly improved reporting capacity. 
2.10 The number of people and financial values indicated above all represent unique stories
and significant achievements in supporting people with complex needs in the
community. Individual arrangements range from people who have support at all times
of the day and night, to people who receive more modest supports over small parts of
the day. Support arrangements include non-standard use of resources in the form of
bespoke purchases  to meet need reflecting genuinely individualised nature of
planning and intervention. Future reporting will increasingly be able to show the breadth
and depth of information to practitioners, localities, commissioning staff as well as to
the governing committees. 
Partnerships 
2.11 Self-directed support at times becomes synonymous with individual budgets but it is
much more of an overarching approach to people living well connected lives within their
communities, which may or may not include the need for an individual budget. 
2.12 Third and voluntary sector partners play a crucial role in supporting the whole system
response. Inspiring Scotland who were the fund manager of the Scottish Government
Support in the Right Direction monies facilitated the opportunity for the North
Lanarkshire Disability Forum, Equals Advocacy and Voluntary Action North
Lanarkshire to empower people and carers to be equal partners in their care ensuring
real choice and control over their lives including how they live and the services/supports
they receive; participating in fulfilling activities and in their communities, and pursuing
employment if that was what was important. 
2.13 The fund of £460,000 between 2019-2024 supported 2,576 people to be. 
• better prepared and more confident in participation in assessment
• informed and listened to 
• creative and flexible in the plans around their life
• confident in the management of their own support and individual budgets
• generally more knowledgeable and understanding of self-directed support
principles and options for them. 
2.14 The experience and learning from the SIRD achievements has directly influenced the
creation of the Community Connector role which increases the capacity to support
people in the community to be resourceful and use their own resources well, as well as
support people to participate as equal partners in the more formal responses to their
support where needed.
Page 8 of 100

Page 9

2.16 The Community Connectors role, also hosted by the North Lanarkshire Disability
Forum utilises £600k identified through the Winter Planning and Enhanced Support
funding stream as well as the Improving Cancer Journey monies. The capacity to
support the work in each locality is significantly enhanced through 10 Community
Connectors. 
2.17 The importance of whole life planning is being explored through the Getting it Right for
Everyone Pathfinder work North Lanarkshire is engaged with. The role of the third and
voluntary sector is crucial in supporting a broader approach to helping people plan for
the long term without “medicalising” or “clientising” into more formal services and
supports before that is needed, but equipping people well for when that is the right
response. 
2.18 Self-directed support also needs resilient communities that are welcoming and
inclusive. Community Solutions works to the principles of self-directed support and
promotes the ambition of people having well connected lives through all the work
undertaken through their themed work as well as through their community consortia. 
2.19 Work with Enterprise colleagues is exploring opportunity through community wealth
building within health and social care. Using the NHSL and Council anchor status and
considering community wealth building will not only promote choice and control for
people who have support needs but will draw a focus on employee-owned business,
small provider development, entrepreneurship and supporting existing providers. 
2.20 The vast majority of the £93m supporting people to live full and active lives involves
support through independent sector providers. The 10-year framework agreement
supporting individualised funding arrangements is an important example of ethical
commissioning with strong partnerships and active participation in the development of
responses in North Lanarkshire. There are currently 56 providers on the framework
supporting genuine choice. 
2.21 The quality of provision remains high and is subject to separate, more detailed
reporting. 
2.22 The cost-of-living pressures, recruitment and retention of a skilled and flexible
workforce remains a challenge for the independent sector in the same way that it
impacts in other parts of the whole health and social care partnership. Work to support
the sector has included the allocation of non-recurring resources through the Winter
Planning, Enhanced Support monies to impact on infrastructure responses and
capacity building which has been welcomed by the sector. 
2.23 Partnership working with independent sector providers is also supporting the
achievement of the Coming Home work, a welcome approach to supporting people
locally rather than in hospital or out of authority resources disconnected from family
and friends. 
2.24 The successes of a truly self-directed support approach to care and support and the
examples of how people’s lives have been transformed continues to inspire and build
confidences. There are a relatively small number of people in North Lanarkshire who
sit on the Coming Home register, and work continues to successfully supports people
to move from institutional, buildings based services to arrangements which much better
take account of individual lifestyles, communication styles and support of positive
behaviours. 
Page 9 of 100

Page 10

2.25 Increasingly the complexity of people’s health care needs in the community involves
interesting discussion about the design and delivery of safe care, including, but not
limited to ventilation and respiratory care and supporting people with end-of-life care.
The development of safe operating procedures and active care management remains
a fluid and learning environment to getting it right for everyone. 
2.26 The importance of the partnership approach to achieving the best possible outcomes
for people is being further strengthened within the review of overarching meeting
structures and governance. The active participation of representative from Scottish
Care, People’s own voice, Communities, Carers and Trade Unions will be strengthened
at all levels. 
Resilient workforce 
2.27 Scottish Government Self-directed Support Implementation Study 2018. Report 3: Self-
directed Support Case Studies included analysis of the North Lanarkshire approach as
one of the case studies. The report noted that whilst the four self-directed support
options are a gateway to choice and control, evidence was that equally important was: 
• the quality of assessment, including a genuinely ‘good conversation;’ 
• the degree to which there is a focus on outcomes; 
• the budgets available to meet these outcomes and the availability of local
providers able to deliver the support required; and 
• the enabled creativity and authority of supported people, practitioners and the
care market to find solutions to meet those outcomes. 
2.28 Whilst there is good progress on many reflections from this report, a Self-Evaluation
against current standards will help channel actions to greatest impact. In the meantime,
there have been some key developments achieved.
2.29 A learning and development plan is in place to support new and existing practitioners,
team leaders and seniors, managers and wider stakeholders. Practitioners, people who
have support arrangement in place, family carers, independent sector providers and
third and voluntary sector providers are also actively involved in the delivery of more
formal training as well as in the ongoing refresh of the plan. 
2.30 Work is ongoing with colleagues involved in the delivery of both local authority and
independent sector Home Support service to Increase choice and control through
individualising arrangements and planning with people to meet changing needs flexibly
and responsively, understanding the focus on frailty. 
2.31 In keeping with a place-based approach to empowering localities and facilitating
decision making closest to the person, changes to the authorisation of individual
budgets within an enabling approach to localities has been introduced. This approach
has increased the speed of decision making, empowered practitioners and leaders,
and increased the creativity and flexibility that underpins good SDS. 
CONCLUSIONS
2.32 Self-directed support is the approach threading through all of the work of the Health
and Social Care partnership. The ability to respond to people uniquely and continue to
individualise responses including where an individual budget supports choice and
control will remain the route to mitigate the impact of demographic change, cost of living
challenges, workforce pressures and shared pressures across health services. 
Page 10 of 100

Page 11

2.33 The priority of work over the next 12 months, informed by the completion of a Self-
Evaluation will be building resilience and sustainability:
• In communities – helping people to help themselves first, ensuring the best
information, advice and access to self-assessment / self-help.
• In the Sector – recognising the importance of partnerships with all stakeholders,
articulating that through good market facilitation and a focus on community wealth
building.
• In the workforce – training and development, fully using the care academy and
developing the role of Scottish Care 
3. Measures of success 
3.1  The principles of SDS being delivered across Health and Social Care. 
3.2 People can access information and support that helps them help themselves first. 
3.3 Maintaining a place-based approach that empowers localities to facilitate decision
making closest to the person. 
4. Supporting documentation 
4.1 N/A 
Diane Fraser
Chief Officer / Head of Service (Adult Social Work Services) 
Page 11 of 100

Page 12

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Balancing the available resources with demand is a key feature of supporting local
decisions about best use of resources and supporting the flexible and imaginative
use of the resource available. 
Measures described throughout the report are being introduced to support the
demand and ensure equitable distribution of allocated funding. Future reporting will
demonstrate the impact of changed ways of working. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
This approach meets the requirements set out in the Self- Directed Support
legislation. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data? 
Yes ☒ No ☐
Page 12 of 100

Page 13

If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☒ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk .  All completed as part of the SDS
Framework procurement exercise and currently under review as part of our Back to
Basics / Locality Enabling Approach. 
Yes ☒ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Our approach is to support people to remain at home and have access to locally
based resource, thus reducing the impact on travel. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Aligns with the Resilient People POW and promoting our approach to delivering
health and social care services. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
We do not operate services within the principles of SDS and that demand and
resources are not aligned. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒
Page 13 of 100

Page 14

If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒ 
Page 14 of 100

Page 15

North Lanarkshire Council
Report
Adult Care and Social Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    DF/KW/AMCG Date 03/09/24 
Home Support Service 
From  Diane Fraser, Chief Officer / Head of Service (Adult Social Work Services)  
E-mail FraserDi@northlan.gov.uk Telephone 
Executive Summary 
In North Lanarkshire there has been a sustained approach to supporting people to live 
safely and independently at home, connected to their family, friends and local community 
for as long as possible. Whilst we have a range of social care supports available to 
support people North Lanarkshire Home Support Service is key to ensuring that people  
can remain at home and contributes to the sustained efforts to maintain a positive balance  
of care in the North Lanarkshire. 
This report will inform the progress on the implementation of the redesign of the Home
Support Service which was approved in 2018. It will outline the work that has been
undertaken following the recovery from the pandemic focusing on areas such as demand,
complexity of support, workforce challenges, new models of delivery from acute setting and
changing demographics. This will demonstrate that the model approved in 2018 remains
fit for purpose and aligns with the current aims and objectives of the Strategic
Commissioning Plan. 
Recommendations
It is recommended that the Adult Care and Social Work Committee. 
(1) Acknowledge the developments within Home Support Service and the progress being
made to implement the approved operating model. 
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement
(12) Ensure our residents are able to achieve, maintain, and
recover their independence through appropriate supports at home
and in their communities
Programme of Work Statutory / corporate / service requirement
Page 15 of 100

Page 16

Home Support Workforce 
1. Background 
1.1  The Health and Social Care Partnership are committed to ensuring individuals who are
referred for a needs-based assessment to enhance their daily living get the right
support, at the right time and in the right place.  To maximise an individual’s
independence and resilience, reablement and rehabilitation services are key to this
process. 
1.2 The plan for the new operating model to deliver Home Support was agreed by the IJB
in March 2018. The model was based on the outputs of the Cross−Party Working
Group, the advice from support officers and wider officer research, the proposed new
model focuses on five major elements:
• Integrated Model (Discharge to Assess in Localities) 
• Same Day Response/Reablement/First Support (Intensive and time limited) 
• Specialist Teams (e.g. supporting people with frequently changing needs and
end of life / Palliative Care) 
• Ongoing Paid Support (allocation of an individual budget to deliver individual
outcomes as part of SDS) 
• Quality Assurance (improving standards of care) 
1.3 The plan outlined that the Home Support Service was to be a functional model based
on two elements; assessment and planning (overall assessment and planning activity
or the service) and long-term service delivery which will be referred to as the Living
Well Service (providing support to those with complex health and social care needs). 
1.4 The implementation of the new operating model commenced prior to the pandemic
which included the centralisation of the management and administration of the service. 
Although elements were progressed, the pandemic had a significant impact on the
Services’ ability to fully implement the model. 
1.5      In response to the pandemic a number of changes had taken place to enable the service
to operate during very challenging circumstances. Social care provision faced
considerable workforce challenges as well as significant changes to the way care and
Assessment and Planning Living Well Service
Enabling Approach
Page 16 of 100

Page 17

support was delivered. To support recovery there was significant investment which was
reported through Winter Planning and Enhanced Support Business Case.  The
investment in a range of activities including Home Assessment, Reablement and
rehabilitation was key to delivering key elements of prevention and early intervention
which accelerated elements of the Home Support model. The success of the new
model is also predicated on the investment and delivery of new systems Mosaic and
dynamic scheduling system to modernise the service. Following this period of recovery
a review was agreed in 2022 to ensure that the model agreed in 2018 remained fit for
purpose. 
1.6  This report will outline the work undertaken to engage staff and those who receive
services as well as the partnership work that has been undertaken with the Care
Inspectorate to improve the quality of service being delivered in North Lanarkshire to
improve outcomes for people who need support. 
2. Report 
2.1 The service currently supports 2,235 individuals.  Data gathered and used to inform
changes highlights the significant growth in multi worker visits whereby 33.5% of all
visits require two or more workers to support service users at each visit.  This upward
trajectory (graph 1) displays evidence of some of the challenges that are currently
facing the service.  Work is in the early stages of exploring single handed care, which
will be of significant benefit to the service once this is fully embedded and supported in
the future. 
2.2 Over the last financial year, the service received 3,800 requests for assistance from
people not known to the service.  The number of care hours delivered has risen steadily
since the pandemic (graph 2) and remains significantly higher than the hours delivered
pre covid.   
Page 17 of 100

Page 18

2.3 Despite the increase in the hours provided, the number of service users have fallen in
the corresponding time frame.  The service users that are now supported present with
more complex health and social care needs.  As the number of individuals in the
community with complex care needs continues to rise, the requirement for specialist
provision becomes more apparent.   
2.4 North Lanarkshire has, for many years, had a positive balance of care, a term which is
used to refer to the balance of support and care available within the community- based
settings compared with support within residential settings. This is supported by the
continued investment in community – based supports and a long standing commitment
to self-directed support. This is underpinned by community support which is co-
designed with individuals and their carers/ families.  This approach has resulted in a
high proportion of individuals remaining at home. 
2.5 Local Government Benchmarking Figures 2022/23 report that 65% of individuals over
the age of 65 with long term needs receiving 10 or more hours of home care per week
which is above the Scottish average of 61%. Along with other providers, NLC Home
Support Service is a key resource within North Lanarkshire to enabling individuals to
remain at home and retain a positive balance of care. 
2.6 In line with the five key elements outlined by the cross-party working group integrated
care remains a priority. The operating model for localities in UHNL HSCP is
underpinned by an enabling approach which is being embedded through robust
screening, assessment and resource allocation. This approach will ensure that
individuals, carers and families have a support plan that is co-designed, with good
information, utilising local resources and alternative support which is proportionate. 
Page 18 of 100

Page 19

Assessment and Planning 
2.7 The development of an integrated approach through the establishment of  Home
Assessment Team working closely with Reablement and Integrated Rehabilitation
Team builds on the work to deliver discharge to assess and same day response. This
aligns the home support workforce with locality health and social work teams and will
provide a range of resources to facilitate assessment and planning. By adopting this
approach, it will ensure that when someone needs longer term support it is based on
thorough assessment and support planning. This will be for people whose needs are
more complex, including end of life care, within their own home.   
2.8 The performance of both the Home Assessment and Reablement Team demonstrate
that consistently more than 50% of people leave without ongoing support. In the last
quarter 58% of people left reablement with no services or a reduction. The growing
evidence highlights that short term assessment and reablement increases
independence and reduces dependency on further care and support. 
2.9 This work has also contributed to the improved discharge planning at both University
Hospital Monklands and University Hospital Wishaw.  Ongoing actions to maintain flow
are essential to reduce readmissions and demand for long-term care and support,
including the sustainability of the Home Support Service.  A shift of focus to same day
discharge and assessment and rehabilitation at home will improve outcomes and
support quicker recovery. 
Living Well Service 
2.10 When people need ongoing paid support, it is essential that waiting times are minimal
and people have options as to how this will be delivered. Following assessment and
support planning, individuals will have the option of NLC home support delivered by the
Living Well Service. Supported people can consider how their support is delivered
through the 4 options as outlined in the self- directed support legislation. At the point of
review, options will be discussed including individual budgets or direct payments which
can be used flexibly to meet identified outcomes. 
2.11 The home support workforce in North Lanarkshire, provides essential support and care
to individuals, carers and families. The Living Well Service will continue to provide care
and support to individuals who require longer term, planned support. Due to the
changing demographics and complexity of individuals requiring support, the workforce
will be able to provide a responsive, flexible approach to those with fluctuating needs. 
2.12 The workforce establishment and structure need to be finalised to allow for the model
to be fully operational. This work will be ongoing with business partners and trade
unions. 
Workforce 
2.13 There are approximately 1,387 staff employed by NLC Home Support Service, with a
worker profile of 6% male, 16.99% age 60 and over and 6.48% age 30 and under. This
includes Home Support Workers in Reablement, Home Assessment Team, Intensive,
Community Alarm and Living Well Service. The management and support roles were
Page 19 of 100

Page 20

reviewed, and a new structure implemented in 2019. These roles support with
scheduling visits, carrying out reviews, supervision and training. 
2.14 Recruitment of Home Support Workers remains a challenge due to the high turnover
of staff. However, the recruitment of staff to assessment and planning has been
prioritised to support the operational model. 
2.15 The need for a competent, confident workforce which is supported by a sustainable
learning and development programme is key to ensuring safe,    high-quality practice
by motivated staff.    The service has invested in dedicated staff to support learning and
development through training, including refresher cycles, and investment in workforce
development to provide high quality care. 
2.16 An overall training plan has been created and has been made available to managers
within the service.  The plan ensures key activity is progressed including monitoring
mandatory training for Home Support Workers as well as. highlighting registration
requirements for all staff to deliver quality driven service offering flexibility and focused
on service user outcomes. The below graph provides information relating to the
increase of staff members undertaking core training. 
2.17 The service has been reporting higher levels of absence over the past 12 months which
has an impact on service delivery. There is ongoing work with Employee and Policy
Officers to review the current situation. 
2.18  It is important to note that the agreed model intended to deliver a more financially
viable service. The budget allocation for 2024-2025 is £48.083m. The shift of resources
to focus on prevention and early intervention is essential to assist in managing demand
to ensure people get the right support at the right time. There are a number of key
actions for the service to create efficiencies and they include the introduction of a
dynamic scheduling tool which is a key development.   
Page 20 of 100

Page 21

Dynamic scheduling system 
2.19 Individuals regularly request support and care at key points in the day and this can
place pressure on the service. The current shift patterns of staff do not always match
with the demand. The dynamic scheduling tool will assist with this but due to the number
of different shift patterns that exist it will be necessary to consider how we address this
to ensure a more efficient service.  
2.20 A key aspect of service efficiency and improvement is the implementation of a dynamic
scheduling tool to benefit Home Support Workers in the community and for those who
schedule and plan work.  It is an essential development to aid back-office staff to
efficiently and effectively scheduler support and adapt quickly with changing needs.
The tool is vital due to the current contract with Advanced/Kirona expiring on 31st
October 2024, with no further option to extend as the current product is end of life.
Following a procurement exercise Access CM were awarded the contract. 
2.21 The contract to provide a dynamic scheduling tool will offer a wider range of benefits to
staff and service users alike with the ability to produce accurate reports which will help
to inform future demand upon the service.  The tool will improve consistency, reduce
missed visits, and incorporate travel time accurately.  For the first time, the service will
be able to monitor care delivery in real-time and monitor quality indicators such as
punctuality, continuity and service duration.  The tool will demonstrate how person-
centred support improves quality of life and measures the effectiveness of care
delivered. 
2.22 Work patterns for frontline staff require to be reviewed. This will be essential to ensure
any efficiencies arising from the implementation of a dynamic scheduling tool can be
implemented. The workforce workstream have identified gaps in service provision that
require to be addressed through the review.   
2.23 Ongoing work continues for data cleansing and transfer as well as identifying training
programmes in preparation for the new tool including the implementation of Mosaic
(new case management system).     
Engagement 
2.24 An important aspect in the review of the service model was to involve both staff and
individuals who use the service by offering opportunities for them to shape the service
by active participation. 
2.25 Consultation with the workforce and stakeholders was undertaken through a series of
events including face to face meetings across all locality areas and surveys to capture
views and experiences of the current and future model.  During each consultation event
operational issues were captured and addressed which included ‘You Said, We
Listened’. 
2.26 Staff highlighted areas for improvement and issues that impacted on their work. They
also had the opportunity to explore various options. Common themes reported by staff, 
• Not having enough travel time, 
• Having difficulty contacting their managers, 
Page 21 of 100

Page 22

• Waiting time for the Out of Hours Service and not always having enough time
to undertake required tasks.  
• Impact of current work pattern on continuity and consistency of care including,
lack of staff working backshifts, downtime at various points in the day and not
having enough staff at peak times resulting in over time being utilised to ensure
service delivery. 
2.27    The engagement with supported people and their cares/ families highlighted recurring
themes and included the need for continuity of care with consistency of carers and
timing of visits however many reported that carers were respectful and courteous. 
2.28 Following consultation with the workforce and stakeholders, benchmarking was
undertaken with eight local authorities including Renfrewshire, East Dunbartonshire,
South Lanarkshire, Inverclyde, Falkirk, Fife and Glasgow to gain a more in-depth
knowledge and understanding of other Health and Social Care Partnerships, how they
operate and manage Care at Home and Home Support provisions.  This included
gathering data across key areas of service delivery including preventing hospital
admissions, facilitating hospital discharge, managing demand, cost and system.   
2.29 The information collated has allowed the service to identify best practice and useful
learning from others to develop a structure for the Home Support Workforce. A
workforce plan is being finalised.   
Improving Quality 
2.30 The proposed changes will ultimately ensure people have a high quality, safe and
compassionate care and support, which is sustainable and maintained across all
localities. 
2.31 The service continues to work closely with the Care Inspectorate to meet requirements
and make the improvements that have been identified through the inspection process. 
Challenges from staff absence and recruitment of appropriately skilled individuals have
previously impacted on  direct delivery and management teams, however, the service
is starting to see an improving picture.   
Page 22 of 100

Page 23

2.32 The key issues and risks now arising from inspections are lack of consistency of
support, system issues relating to the recording of missed visits and incorporating travel
time, lack of training in developmental areas and outdated reviews and personal
support plans.  Good progress has been made in four of the teams, with two teams
being high-risk areas for staffing and performance, particularly in relation to outstanding
reviews and personal support plans.  Improvement plans have been devised to
progress the significant work, which is overseen by the Senior Social Work Manager. 
The full implementation of a dynamic scheduling tool will reduce missed visits,
incorporate accurate travel time (both walking and driving) and improve consistency of
scheduled care.   
2.33 A demonstration has been provided to all Inspection Officers to give an overview of the
main project benefits/goals, modules involved and examples of reduction in missed
visits, improving efficiency and stronger continuity of care which have been consistently
highlighted by the Care Inspectorate as areas for improvement. 
2.34 The new inspection year commenced in April 2024 and the service has been advised
each team will receive a full inspection during follow up visits, and will now involve three
inspection officers, with a lead officer identified for each team. In addition, there are
plans to conduct a separate review of recruitment processes during 2024, distinct from
the ongoing inspections in localities.   
Conclusions
2.35  This report outlines the progress that has been made to implement the operating model
for the Home Support workforce establishing a functional model. This will focus the
workforce on distinct areas and ensure a delineation between assessment and
planning and provision. 
2.36 The impact of change detailed in the report will improve the quality and consistency of
care and support, improve recruitment and retention, address impaired staff morale,
improve Care Inspectorate grades and maximise efficiencies and capacity within the
service.  This will be supported by good governance, clear infrastructure, a skilled
workforce and improved culture and environment.   
2.37 There has been an incredible amount of work undertaken to ensure that the operating
model is fit for purpose and can adapt into the future as we respond to whole system
changes.   A further update will be provided with the finalised operating model and
associated workforce establishment. 
3. Measures of success 
3.1 The following measures of success have been identified: 
3.1.1 Improving the wellbeing of supported peoples outcomes. 
3.1.2 Evidence of reablement reducing service users’ dependence on long term home
support, working collaboratively with the Assessment and Planning teams to ensure
that we continue to support individuals’ independence and rehabilitation. 
3.1.3 Improved discharge response from Lanarkshire and Glasgow Hospitals.
Page 23 of 100

Page 24

3.1.4 Prioritised resources for ongoing longer-term support which will include the upskilling
of the home support workforce to support service users with complex health and social
care needs within their own homes. 
3.1.5 A flexible and responsive service with evidence of improved quality of care, support
and service delivery resulting in increased Care Inspectorate grades, staff, and service
user satisfaction. 
3.1.6 A competent and confident workforce, fully staffed teams with minimal turnover. 
3.1.7 Ensure a sustainable financial model. 
3.1.8 Have a service which can respond to future demand, with a workforce that can provide
a flexible, responsive, outcome-based approach to supporting people at home. 
4. Supporting documentation 
4.1 N/A 
Diane Fraser
Chief Officer / Head of Service (Adult Social Work Services) 
Page 24 of 100

Page 25

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Currently working with Finance Business Partners to determine any financial implications
to implement the operating model and associated structure.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☒ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☒ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐
Page 25 of 100

Page 26

If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☒ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
A communication plan has been devised. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Key risks are relating to training, lack of funding for medication training and most of
the training being delivered online, staff availability to undertake the work regarding
the transferring of information to the DRS. Risks are recorded on the Corporate risk
register and project risk register 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 26 of 100

Page 27

Page 27 of 100

Page 28

Page 28 of 100

Page 29

North Lanarkshire Council
Report
Adult Care and Social Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    DF/MF/JM/HH/AMCG Date 08/09/24 
Community Alarm Service 
From  Diane Fraser, Chief Officer / Head of Service (Adult Social Work Service)  
E-mail FraserDi@northlan.gov.uk Telephone 
Executive Summary 
This report gives an update on the Community Alarm Service since the last report
in May 2023. It highlights the work undertaken and still required for the analogue to
digital transition. It highlights the Community Alarm Service positive Care
Inspection grades. It recommends the need for a staffing review to meet the needs
of the developing service. Finally, it notes the service charging policy and
sustainability. 
Recommendations
It is recommended that the Adult Care and Social Work Committee 
(1) Acknowledge the contents of this Community Alarm Service update report. 
(2) Acknowledge the ongoing work being undertaken to support the transition from
analogue to digital and the work completed to date. 
(3) Acknowledge the progress and challenges of progressing the move to the new digital
ARC platform and the extensive work completed to date in preparation for this.
(4) Acknowledge the positive Care Inspectorate grading that the service received from
the Care Inspectorate.
(5) Acknowledge the importance of sustainability including service charge. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement
(12) Ensure our residents are able to achieve, maintain, and
recover their independence through appropriate supports at home
and in their communities
Programme of Work Resilient People
Page 29 of 100

Page 30

1. Background 
1.1 The Community Alarm Service operates 24 hours per day, 7 days a week, 365 days
per year. When the individual activates the alarm, a signal is sent via the telephone line
to the alarm receiving centre in North Lanarkshire which is staffed 24 hours a day, 365
days a year. A Response Advisor (call handler) speaks directly to the person to find out
what kind of assistance is required.
1.2 The service currently provides support to 7,724 people in North Lanarkshire with the
confidence that they can call for help at any time of the day or night, every day of the
year and is an essential service when people experience difficulties such as a fall or
sudden illness.
1.3 The number of people supported by the community alarm service has increased slightly
since the previous report submitted in May 2023, most service users living within their
own home, including all tenants living within NLC Sheltered Housing Complexes during
out of hours and variously to registered social landlords across North Lanarkshire.
1.4 The Community Alarm Service currently provides a telecare service to 6,158 people
using dispersed analogue and or digital community alarms and to 1,566 people within
sheltered accommodation.
1.5 The service on average receives around 130 new requests per month for Community
Alarm installations, the number of new referrals received per month has remained
consistent with the figures from 2023/24.
1.6 In addition to the basic button and box which people associate with Community Alarms,
there are over 1,000 pieces of assistive technology programmed through to the alarm
receiving centre. This ranges from door contacts to hard wired smoke detectors for
individuals with cognitive impairment, This has remained static since the previous
report.
1.7 The service review work undertaken since the previous report to committee has
focused on engagement with stakeholders and a focus on the staffing requirements of
the service.  Care Inspection grades have increased and it is evident that the service
is effective, staff are committed, and service users satisfied with the support provided. 
A more detailed breakdown of service user engagement and participation is discussed
later within the report. 
1.8 The staffing resource aligned to the service has not been reviewed for a significant
number of years and given the ongoing work of transitioning the service from analogue
to digital, as well as increased call activity within the alarm receiving centre the decision
was taken to review the staffing resource aligned to this aspect of the service. 
1.9 University North Lanarkshire Health and Social Care Partnership (UNL HSCP) and
North Lanarkshire Council (NLC) have invested significantly in early intervention and
supported self-management for over a decade, with support for change and
investment across all sectors which focus on wellbeing. The Community Alarm Service
is a key part of supporting self-management with technological advancements creating
the opportunity to move from being a crisis response service to being more proactive
and preventative. 
1.10 The above circumstances summarise the importance of the Community Alarms
Service, the changes to the digital infrastructure and need to review the staffing
Page 30 of 100

Page 31

compliment to ensure we realise the priorities and ambitions of the North Lanarkshire
Health and Social Care Strategic Commissioning Plan. 
2. Report 
Analogue to Digital Transition 
2.1 Telephone lines in the UK are being upgraded to digital technology. The process of
migrating to digital telephone lines has already started. The rollout was scheduled to
be completed by the end of 2025, when analogue telephone services in the UK will be
switched off and replaced by digital systems using internet protocol (IP) technology. 
2.2 Telecommunication suppliers are well on their journey to making this switch to ‘IP
networks.’  Any systems relying on analogue lines, such as telecare, will be affected
by this change. Individuals who have been provided with Analogue telecare equipment
from North Lanarkshire Council must have their equipment updated to Digital ready
devices to continue to receive a safe and reliable service. 
2.3 Recent updates from Telephony providers such as British Telecom, have outlined they
now expect all customers to be migrated over to a digital line by January 2027, other
companies are also in the process of reviewing their timescales. 
2.4 Despite the potential change in dates that will impact on the analogue to digital
switchover, the community alarm service will continue to progress the digital upgrade
as planned and hope to ensure that all service users in receipt of the community alarm
service are fully digitised by the end of 2025. 
2.5 North Lanarkshire as outlined in its previous report has been working closely with the
Digital Office for Scottish Local Government. Across Scotland, most current solutions
use analogue dial-up protocols to carry status and alarm signalling between the alarms
devices in users’ homes and the Alarm Receiving Centres (ARC) - North Lanarkshire’s
ARC is based in the Dalziel Building in Motherwell. Digital IP telephone lines are not
designed to support these analogue protocols meaning that there is a risk that telecare
alarm signalling will not operate reliably. This may result in a higher number of failed
calls and redials being seen by the Community Alarm responders on the ARC system. 
2.6 The plan for North Lanarkshire Council’s community alarm service is to transition to
the new national digital ARC, this will ensure that the Alarm Receiving Centre (ARC)
is fully digitised and will meet the digital requirements of our service while minimising
the risks to analogue failures as the decommissioning of these old analogue lines
progress. 
2.7 This will allow the Partnership to adopt a new Digital Solution that will meet future
requirements and can be customised to our specific operational requirements. This
work has included 13 other local authorities to ensure that a robust and secure solution
can be found. At the time of writing several local authorities have successfully
transitioned over to the new digital ARC that will be supported by Chubb and Sky
Response. 
2.8 The transition to digital has required the service to review all alarm devices that are in
place within homes in the community and sheltered house residences and replace
these current analogue devices with digital ready alarm devices. There will also be a
Page 31 of 100

Page 32

requirement for digitally enabled peripherals such as falls detectors, door contacts etc,
to be thoroughly tested to ensure that they are compatible with the new digital alarm
receiving centre and alarm device. The ability to connect existing interconnected
fire/smoke detectors via the digital alarm is currently not available. The Scottish
Government are working with manufacturers on solutions to connect these devices to
remove the need for multiple detectors to be in the same room. 
2.9 The service has already changed around 3000 analogue alarms to a Hybrid digital
ready unit which do not use the analogue telephone line, with a further 1000 planned 
to be exchanged by November 2024. 
2.10 North Lanarkshire currently runs PNC 8.1 an analogue ARC provided by Tunstall
Healthcare (UK) Ltd on servers within the NLC infrastructure. The current contract was
due to end on the 31st of March 2024, however due to delays in the contract being
awarded for the new digital ARC, an interim solution was required due to the current
contract ending, as well as the current Tunstall Infrastructure and servers coming to
the end of their life. 
2.11 Work was undertaken by colleagues from the council’s IT infrastructure team who
concluded that to reduce the potential risks to North Lanarkshire Council it was agreed
that the services digital voice recorders would be switched off reducing risks of
unsupported equipment failure occurring until a more robust plan could be put in place
in the interim. 
2.12 The Interim Software as A Solution (SAAS) has been procured from Tunstall because
of the current servers that support the current Alarm Receiving Centre end of life.
Colleagues from Infrastructure had determined that to do nothing would pose a real
threat to the Community Alarm Service and the wider Council IT infrastructure,
therefore an interim solution has been agreed. 
2.13 The service has entered a 1-year contract for the SAAS solution with an option for a
further year if required. The total contract amount is £107,000, however the service
has a 90-day notice period to cancel the contract early, should the service be able to
move to the new digital ARC, therefore reducing the costs of the overall contract. 
2.14 Housing have undertaken an upgrade of all Sheltered Housing developments to a new
Warden Call system that will be fully digital ready when the Digital ARC is implemented
and are installing equipment in the remaining developments (which were upgraded a
few years ago) to have a Digital connection available in readiness for the move to
Digital. 
2.15 The Community Alarm Service and the Technology team have supported housing
colleagues throughout this process, ensuring hybrid digital alarms were placed in
residents’ homes to ensure no loss of support throughout these works being
completed. 
2.16 There has been an increase in failing calls from Analogue devices identified across the
UK because of the ongoing upgrades to Digital Telephony infrastructure we have seen
this within our own Community Alarm Service where the primary number used to
connect fails, but the backup number then successfully connects. This is being
investigated with IT colleagues to identify what further resilience can be put in place to
reduce these failures. 
Page 32 of 100

Page 33

Data Migration  
2.17 The current data held on the Tunstall PNC system has over 25,000 client records, of
which only 7700 are current users. With the current PNC system there is no facility to
“batch” delete the 18,000 archived records. When the service migrates to the Digital
ARC, we will be charged per client record, therefor it is imperative that only the current
records are migrated to the new system. 
2.18 Significant work has been undertaken to try and retrieve this data from the current PNC
system, however as the service has no direct access to the databases on the PNC
system, we are reliant on Tunstall providing this to us in a usable status. 
2.19 The digital ARC provider has also recently developed a piece of software that they
advise will do this conversion for us from the raw data but will have an associated cost
yet unknown and will also require the same interrogation and verification required as
the direct data from Tunstall noted above. 
Capital Spend 
2.20 Capital monies have been set aside to support the transition from analogue to digital
within the Community alarm Service. 
2.21 During the course of the financial year 23/24 £325,000 had been spent purchasing
1500 hybrid alarms.
2.22 Due to ongoing testing of digital devices, it was decided after extensive testing by the
technology team that 1000 LeGrande alarm devices be purchased, however due to
delays with internal procurement processes, these will be purchased from the 2024/25
budget.
2.23 It is anticipated that £1,275,000 will be available to continue with the purchase of hybrid
digital alarms in this financial year.
2.24 There is a projected increase in cost therefore a funding gap for future years that
requires to be sourced.
Community Alarm Service Review
2.25 Following the previous report submitted to committee in 2023 there had been
discussions in relation to a whole service review in relation to the Community Alarm
Service. 
2.26 As part of the commitment to effective engagement and participation a number of
different approaches have been adopted, some more successful than others. Specific
events were organised but despite wide advertising, did not attract attendance.   
2.27 As specific events did not attract participation in discussion, the service engaging in a
more targeted way,  through forums within Sheltered Housing Complexes and
Integrated Day Services for example, so that the service was able to gauge service
users views of the community alarm service. 
2.28 During the last 12 months the service has attended various events and has spoken
directly to over 200 Service users at a variety of events across North Lanarkshire. 
Page 33 of 100

Page 34

2.29 Feedback from service users was very positive, with many advising that having the
Community Alarm provided them with reassurance should they experience a fall,
required reassurance or required support with personal care. 
2.30 The service also issued a questionnaire seeking service users feedback on the
Community Alarm service, 124 questionnaires were returned.  The findings of the
questionnaire were that service users were satisfied with the service provided and that
staff were helpful, polite and treated people with dignity and respect. 
2.31 The service recently held an awareness day for Health and Social Care staff,
stakeholders and third sector organisations over a 2-day period to provide more
information and insight into the Community Alarm Service and how the service
operates and functions. 
2.32 Over the course of the 2 days, more than 200 people attended, with most leaving with
a better understanding that the community alarm service is more than a button and
box, type service.  People were genuinely interested as to how the service operated
and how we support service users who activate the community alarm. 
2.33 Several focus groups were held with community alarm staff over a number of weeks
in late 2023, each focus group was provided with an open platform to share their
feedback, views, knowledge, and insight into the community alarm service. 
2.34 The feedback was grouped into themes and further analysed to identify several
important issues. Overall staff were incredibly positive about their roles/responsibilities
and proud of the impact that their service had on individuals needing support from the
community alarm service. 
2.35 The key role benefits that staff described were the variety, flexibility, a strong team
ethos, job satisfaction and most staff found the role to be rewarding. 
2.36 There were some operational issues identified and most of them were resolved
following the sessions. The main operational concern staff raised was the Community
Alarm transport as this was becoming aged and unreliable due to age and mileage of
these vehicles. Staff also raised some concerns regarding the shift patterns. 
2.37 Both of these issues have subsequently been addressed with the Community Alarm
Services ageing fleet of vehicles having been replaced in March 2024. The shift pattern
concerns outlined by response advisors has also been addressed with a change to
start and finish times for each of the three responder shift patterns resulting in a better
work life balance and consistent work schedule. 
2.38 It is evident that all staff employed within the community alarm service are committed
and this has been evident with how staff across the service have responded with the
introduction of new digital technology into the service. 
2.39 The Assisted Technology Team have worked closely with the service and worked to
support the response advisors as the new digital alarm platforms have come onstream. 
2.40 The Care Inspectorate, the services regulator conducted an unannounced inspection
of the community alarm service in April 2023, following the inspection the service was
graded as follows: 
Page 34 of 100

Page 35

• How well do we support people wellbeing -  Grade 5 Very Good
• How good is out Leadership -    Grade 4 Good
• How Good is our staff team -    Grade 5 Very Good 
2.41 Following the Inspection Care Inspectors were complimentary on the service provided
across North Lanarkshire by the community alarm service and feedback obtained
during the inspection process from both service users and staff was positive and this
was reflected in the grades awarded. All previous requirements had been met and the
service has currently no requirements. 
2.42 The importance of reviewing staffing requirements through the move from an analogue
to digital solution was recognised through the engagement. 
2.43 The alarm receiving centre is staffed 24hrs per day, Response Advisors respond to all
incoming and outgoing activity in relation to community alarm and take calls for the
Social Work Emergency Service (SWES) from 1.30am till locality offices open or when
the team come on site at weekends. 
2.44 The alarm receiving centre typically has more than over 40,000 call episodes per
month, however most of these calls are to provide reassurance to service users within
their own homes. 
2.45 A Benchmarking exercise has been completed with other Alarm Receiving Centres in
terms of response advisors manning the service 24 hours per day, North Lanarkshire
has 3 response advisors on shift at any given time, however when compared to other
Local Authorities our staffing numbers are on the lower end for staff resources. 
2.46 Response advisors are a crucial part of the community alarm service; however, the
establishment of this staff group has never been reviewed and during 2023 the service
required to cover 900 additional shifts due to staff planned and unplanned leave. 
2.47 Response advisor staffing is currently being reviewed as part of the wider engagement
of the Home Support structure as it is recognised that additional staffing is required
within this aspect of the service. 
2.48 From the 1st of April 2024, the new Health and Care (Staffing) (Scotland) Act 2019 came
into force. When enacted it revoked section 15 of the Public Service Reform (Scotland)
Act 2010 and brings legislation requirements and guiding principles for those who
commission and deliver health and social care services. 
2.49 The Act also places a statutory duty on care service providers to ensure that, always,
suitable qualified and competent individuals are working in such numbers as are
appropriate for the health, wellbeing and safety of people using the service, and the
provision of safe and high-quality care and in so far as it affects those matters the well-
being of staff.   
Community Alarm Charging 
2.50 In accordance with the Integration Scheme, the North Lanarkshire IJB is required to
approve a balanced budget on the basis of funding delegated by North Lanarkshire
Council and NHS Lanarkshire before the start of each financial year. 
Page 35 of 100

Page 36

2.51 Following approval of the budget, the IJB sends directions to both partner bodies
setting out the agreed budget and the Strategic Commissioning Plan details the
changes that the IJB is seeking to make in the design and delivery of health and care
services. 
2.52 However, decisions around charges for services remain with the partner bodies. In
February 2020, North Lanarkshire Council approved the decision to commence
Community Alarm charging from September 2020 as part of its budget setting process.
Since that date, a charge of £3.40 per week (49p per day) has supported the
sustainability of the service. Any calls made to the response centre are billed as normal
telephone calls by the person’s telephone company. 
2.53 The Council’s Discretionary Fees & Charges Policy was approved at Policy & Strategy
Committee in September 2023.  This policy was designed to allow for an annual uplift
to discretionary fees and charges to support the implementation of one of the key
principles of the approved Revenue Resources Budget Strategy which is that “Future
charging models for services provided will be informed by benchmarking and the
principles of full cost recovery”.  The guidance states that all discretionary charges
should aim to cover the full cost of providing the goods or services therefore in line with
the policy, all discretionary fees and charges were to be increased annually from 1 April
2024 by a flat percentage of 5% (or any subsequent amendment to this
policy).  Services are required to ensure compliance with the policy and ensure
discretionary fees and charges are increased accordingly.  Any variation to this must
be discussed and agreed with the Section 95 Officer.  
2.54 Therefore, the charge for the community alarm service increased to £3.57 per week
(51p per day) from the 1st of April 2024. Even with the slight increase applied from
April, the charge for the community alarm service within North Lanarkshire remains one
of the lowest when compared to all other local authorities across Scotland (see
appendix 2).
2.55 The service continues to receive on average 130 new referrals for installation of
community alarms on a monthly basis.  Those being referred to the service are aware
of the charge and should be offered a referral to the tacking poverty team to ensure
their income is maximised by the referring agency or service. 
2.56 The number of service users in receipt of the Community Alarm service has remained
stable, at 7,700. A significant amount of data cleansing was undertaken when the
charge was reintroduced. 
2.57 The data cleansing exercise completed at the onset of the charge found that a
significant number of service users had passed away, had moved into sheltered
housing or had moved into a care home.  The council’s data custodian supported the
service with identifying these service users so that the data could be cleansed and
updated to reflect actual service users in receipt of the community alarm. 
2.58 Every person receiving or considering a Community Alarm Service has been and is
offered support to maximise their income.   
2.59 It was recognised that the agreed charge would support the Council and the Integration
Joint Board to continue to deliver this service to a high standard through having the
appropriate staffing and financial resources to meet the needs of those who use the
Page 36 of 100

Page 37

service. It would be damaging to the service and the partnership to reverse the current
charging arrangements. 
2.60 It should also be noted that the transition from Analogue to Digital alarms will continue
to attract further operating costs as each alarm will have as a minimum one roaming
SIM card, however two may be required if there is no home broadband connection that
can be used as a primary connection to the ARC. Current costs for these roaming SIM
cards are £4.00 per month per unit, the cost of which could increase annually in line
with inflation. The Digital Office have indicated that they will engage with Telecom
suppliers to try and negotiate a Social Tariff, however this has not progressed yet.
Based on a current installed estate of 7,700 alarm units this will bring an operating cost
of between £360,000 and £450,000 per annum (based on £4.00 per month current
charge or an anticipated £5.00 per month) to support the new digital alarms. 
2.61 The income generated from the charge for community alarms is important to the
continued development of the service and increased operating costs associated with
digital advancement. It is however important to note that the Council had not pursued
the recovery of debt and as noted in previous Committee Reports, given the
vulnerability of people using the service, individual community alarms will not be cut
off due to non-payment. 
2.62 Invoices generated within the financial year 2023/24 amounted to £998k for the
Community Alarm charge, however £202k remained outstanding at the end of year
finance reporting period. This represents around 20% of invoices remaining
outstanding. Outstanding invoices can be for several factors and the service is not
always notified e.g. service user deceased, moved to sheltered housing, hospital or
care home admission, unknown reason and nonpayment choice.  The actual income
received to date for financial year 23/24 amounts to £796k. 
2.63 A sundry debt write off exercise is currently underway which will result in £137k of the
outstanding debt being written off up to April 2022 as it has been deemed
uneconomical to pursue. 
2.64 At the point of the Charge being reintroduced in 2020 all recipients of the community
alarm service were offered a review of their income by the financial inclusion team to
ensure all benefits had been fully maximised. 
2.65 Any recipient of the Community Alarm Service who make contact with the service to
advise of financial difficulties in paying the charge is referred to the tackling poverty
team (formerly financial inclusion team), however we would not remove someone’s
alarm for nonpayment of the charge. 
2.66 The service is continuing to review the number of non-payments that have accrued,
and officers are working through information held within the mySWIS system. 
CONCLUSIONS
2.67 This report gives an update on the Community Alarm Service. It highlights the work
undertaken for the transition of analogue to digital; both the challenges and progress
are noted. Additionally, the positive Community Alarm Service gradings from the Care
Inspectorate are recognised. From engagement and consultation, it is agreed that the
service staffing resource requires review. Finally, it notes the service charging position. 
Page 37 of 100

Page 38

3. Measures of success 
3.1      The Community Alarm Service maintains or improves the Care Inspection grades and
subsequent service delivery. 
3.2     Continued collaboration with the Assistive Technology team to support people in our
communities with assistive technology and telecare equipment. 
3.3    A service review is undertaken to identify the appropriate staff resource for the
Community Alarm Service. 
3.4      The Community Alarm Service further develops as a proactive and preventative
service. 
3.5       The analogue to digital transition is successful and achieved by the end of 2025. 
4. Supporting documentation 
4.1 Appendix 1 Analogue to Digital EQIA
4.2 Appendix 2 Weekly community alarm charge. 
Diane Fraser
Chief Officer / Head of Service (Adult Social Work Services) 
Page 38 of 100

Page 39

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Financial implications contained within the report. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
HR will support the staff review mentioned within the report 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Page 39 of 100

Page 40

Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Analogue to digital transition as outlined in the report 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☒ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Analogue to Digital Transition, medium risk level. Risk owner, Graeme Cowan.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 40 of 100

Page 41

Name of Policy / Budget Saving Analogue to Digital Transition Project 
Author Robert McClung Contact details McClungR@northlan.gov.uk
Owner Diane Fraser FraserDi@northlan.gov.uk 
EqIA version number  EqIA status Complete  X Incomplete 
If Incomplete please say why - for instance 
pending further consultation  / research 
Appendix 1
Page 41 of 100

Page 42

Section 1. About the Policy
1.1 Name of the policy / strategy / function / procedure: 
Is this a: - 
A new policy /strategy / function / procedure / service                     
Budget saving                     
Review of policy /strategy / function / procedure                     
Review of Service       
Other (please specify) Community Asset Transfer 
Is this is a key strategic decision subject to the Fairer Scotland Duty Yes  No     
1.2 Person Responsible for the policy etc.
Name: Robert McClung Job Title and Service / Team: Senior Officer Analogue to
Digital project Lead (Adult Services)   
1.3 What is the scope of the
assessment?
 Detail where appropriate
Whole of the organisation  
Service specific  
Discipline specific  
Other   
1.4 What is the policy/ strategy/ function/ saving trying to achieve / do? 
Page 42 of 100

Page 43

Analogue to Digital
Telephone lines in the UK are being upgraded to digital technology. The process of migrating to
digital telephone lines has already started, and the rollout is scheduled to be completed by 2025.
As of 2021 services can no longer sell analogue services such as BT and Virgin, and by and
escalated process by 2023 no analogue tech
nology can be sold also by any company. 
Analogue to Digital in Community Alarm
Current telecare solutions in use in Scotland use analogue technology. This means that they send
signals between the alarm device and Alarm Receiving Centre (ARC) by making a dialup phone call
and sending a series of audible tones. Analogue signalling does not work reliably when sent over
the digital phone lines that are being installed in user’s homes, grouped schemes, and ARCs
Telecare is digital when signalling traffic is carried end-to-end (from a user’s alarm device to the
ARC) in a digital format. This device is not connected to the user’s telephone line, instead it
contains a SIM card that allows it to connect to the mobile telephone networks. 
This means that the Alarm Receving Centre, alarm devices and peripherals will now need to be
digitally enabled to meet the future needs of the service users within our community. 
This project fits directly into the council’s ambition priority to - Improve the health and wellbeing
of our communities. 
North Lanarkshire Health and Social Care partnership and North Lanarkshire Council is looking to
develop a strategic business plan for the analogue to digital transition through the review and
analysis of current service provision and their users. 
This project will look to have an in-depth look at understanding of current technology in place,
current HSCNL digital workstreams and their impact on this project and collaboration, engagement
of community alarm users, engagement of HSCNL staff in respect of technology and community
alarm service and appraisal of alternative technology for future use within the partnership 
This project will look to provide our communities with the ability for self-management, proactive
responses from services and for a holistic person-centered basis for a person’s wellbeing using
technology. 
This project will have produced a strategic business plan for the analogue to digital transition along
with all relevant risk assessments. 
Page 43 of 100

Page 44

Following the strategic business plan, this project will then focus on implementing the
organizations transition from analogue to digital. This will come in the form of procuring a new
alarm receiving center through a cloud hosted based system or hardware-based system, to replace
our current analogue alarm receiving center. This will then allow for us to look at digitally enabled
devices to replace our current analogue community alarms. 
1.5 If this is a budget saving, how will the saving be achieved? 
This project will not focus on budget savings. 
Section 2. What do I know now?
2.1 Who are the stakeholders and beneficiaries? 
The stakeholders will be our residents within North Lanarkshire Council areas who are provided
with a community alarm service or a telecare service. 
Other stakeholders will be employees who work for the community alarm service and Health and
Social care who assess and prescribe telecare equipment.
2.2 What data, consultation, research and other evidence or information is available relevant to
this assessment? (This is a desktop exercise) 
Digital Telecare National Briefing Document (2020) gives an overview of the work done by
telephony providers around the transition of their analogue copper lines to new fibre digital lines.
This was done without consultation of the public or any organisation. 
This document also outlines 
• An estimated timeline with an in-depth breakdown of the timescales to complete key
operational components of the transition.
• Estimated resources and costings for the transition.
• Information on the impact that the transition will have on service users.
• Potential benefits and opportunities of a digital telecare service.
• Risks to be considered.
• Recommendations that telecare service providers should follow to minimise disruption to
their service users.
• Information on resources available from the Digital Telecare Programme which will support
the transition journey. 
North Lanarkshire have also enlisted a third part organisation to carry out reviews of the community
alarm service which details peoples experience of using this alarm system.
Page 44 of 100

Page 45

2.3 Considering the information in Section 1 and 2.1 and 2.2 
2.3.1 If this policy is subject to the FSD what does it suggest about the impact or potential
impact on socio-economic disadvantage? (please refer to FSD Interim Guidance)                                          
Low income People in receipt of a community alarm are now in
the process of being charged for this. Due to the
digital upgrade and the enhance cost of equipment
and alarm receiving centre this will further affect cost
of this service.                                           
Low wealth 
Material deprivation 
Area deprivation 
2.3.2 Are any of the people communities listed below likely to be more affected by this policy
than others?  
People who share one or more of the
protected characteristics of the Equality
Act 2010
Yes Details No Details Don’t
Know
Age (a particular age or range of ages)  X 78.1% of
community
alarm users are
aged 70 years
and over. 
Disabled people and people with long
term health conditions
X Most users of
the community
alarm service
fall within this
characteristic.
We are unable
to pull statistics
for this.   
Women and men, girls and boys   X  
People defined by their race, colour and
nationality, ethnic or national origins.  
X  
Married people and civil partners   X  
Pregnant women and new mothers
(including breastfeeding women)  
X  
Lesbian, gay and bisexual people   X  
Page 45 of 100

Page 46

People transitioning from one gender to
another  
X  
People of different religions or beliefs or
non-beliefs  
X  
Other groups   
Children and families   X  
Homeless people   X  
Looked after and accommodated people   X  
Care leavers   X  
Carers – paid / unpaid, family members X Carers will be
affected due
their possible
requirement to
use the
community
alarm systems
to summon
support fore the
person they are
providing the
care 
Asylum seekers   X  
Employees – full and part time. Including
SES, MAs etc.
X Staff who work
within the
service will be
affected by
changes to their
operating
systems and
procedures.   
Others     
2.4 Do you have evidence or reason to believe that this policy will, or may potentially affect the
Council’s duty to: (Please tick all that apply). 
Yes No Don’t
Know
Page 46 of 100

Page 47

1. Eliminate unlawful discrimination, harassment and victimisation and any
other conduct prohibited by the Equality Act 2010? 
X 
2.Advance equality of opportunity between people who share a relevant
protected characteristic and those who do not 
X 
3. Foster good relations between people who share a protected
characteristic and those who do not? 
X 
4. Protect and promote human rights?  X 
5. Reduce socio-economic disadvantage  X 
Please provide details. 
Section 3. What else do I need to know /find out?
3.1 Further consultation – Please use the table directly below to say who you will consult with
(tick Yes or No). Consider those groups from section 2.3 where you ticked yes or don’t know.
Once consultation has taken place provide the details below. 
People and
communities 
Yes No Describe what you did, with whom and when. Please
provide a brief summary of the responses gained and
links to relevant documents, as well as any actions
Age (a particular age or
range of ages) 
X  Information relating to the digital transition will be
passed to all relevant users of the community alarm
service. This will be done in conjunction with our
communications team to ensure that the most up to date
information is sent and is accessible for all.
Disabled people and
people with long term
health conditions
X  Information relating to the digital transition will be
passed to all relevant users of the community alarm
service. This will be done in conjunction with our
communications team to ensure that the most up to date
information is sent and is accessible for all.
Women and men, girls
and boys 
X 
People defined by their
race, colour and
nationality, ethnic or
national origins. 
X 
Married people and
civil partners 
X 
Page 47 of 100

Page 48

Pregnant women and
new mothers and
breastfeeding women. 
X 
Lesbian, gay and
bisexual people 
X 
People transitioning
from one gender to
another 
X 
People of different
religions or beliefs or
non-beliefs 
X  
Other groups   
X 
Children and families  X 
Homeless people  X 
Looked after and
accommodated people 
X 
Care leavers  X 
Carers – paid / unpaid,
family members
X  Information relating to the digital transition will be
passed to all relevant users of the community alarm
service. This will be done in conjunction with our
communications team to ensure that the most up to date
information is sent and is accessible for all.
Asylum Seekers  X 
Trade Unions   X 
Employee Equality
Forum 
X 
Others  X 
3.2 What additional research or data is required? 
At this time all research and data has been provided by the Digital Office for Scotland as this is a
nationwide activity being completed by external telephony providers which will affect all areas. 
Page 48 of 100

Page 49

3.3 What does the additional research and data tell you about potential or known effects? 
N/A 
Section 4. Assessing the impact and strengthening the policy
Considering all the evidence you now have from section 1-3, how will the policy affect different
people and communities in relation to equality, socio-economic disadvantage and human rights?
4.1 How does/will the policy and resulting activity affect those with the characteristics listed
below (including employees)? Please use the table below to provide details. 
Detail any Positive impact Detail any
adverse impact
If adverse how can
we mitigate this?
Where no
mitigating action is
planned please say
why not
Age (a particular age
or range of ages)  The introduction of digital
telecare will allow for better call
function
(clarity/speed/reliability/quality.
This will also allow for further
technology which could enhance
care and independence to be
introduced.
Due to the digital
upgrade and the
enhance cost of
equipment and
alarm receiving
centre this will
further affect
cost of this
service. 
Ensure that
benefits have
been maximised.
Disabled people and
people with long
term health
conditions
The introduction of digital
telecare will allow for better call
function
(clarity/speed/reliability/quality.
This will also allow for further
technology which could enhance
care and independence to be
introduced.
Due to the digital
upgrade and the
enhance cost of
equipment and
alarm receiving
centre this will
further affect
cost of this
service.
Ensure that
benefits have
been maximised.
Women and men,
girls and boys   
People defined by
their race, colour
and nationality,   
Page 49 of 100

Page 50

ethnic or national
origins.
Married people and
civil partners   
Pregnant women
and new mothers
(including
breastfeeding
women)   
Lesbian, gay and
bisexual people   
People transitioning
from one gender to
another   
People of different
religions or beliefs
or non-beliefs   
Other groups   
Children  and
families   
Homeless people   
Looked after and
accommodated
people   
Care leavers   
Carers – paid /
unpaid, family
members
The introduction of digital
telecare will allow for better call
function
(clarity/speed/reliability/quality.
This will also allow for further
technology which could enhance
care and independence to be
introduced.
Due to the digital
upgrade and the
enhance cost of
equipment and
alarm receiving
centre this will
further affect
cost of this
service.
Support is provide
to ensure the
person they care
with has their
benefits
maximised to
allow them to
keep this service.
Asylum Seekers   
Employees – full and
part time. Including
SES, MAs etc.
The introduction to the digital
telecare should provide a better
working platform for staff with
better call reliability and
A new way of
working may
need to be
introduced
Support will be
provided
Page 50 of 100

Page 51

handling. This should reflect in
their ability to take and field
calls more efficiently
which will
require further
training and
support for staff
to follow
throughout the
project.
Others   
4.2 What measures could be taken to strengthen the policy / strategy to help advance equality
of opportunity, foster good relations, promote human rights and reduce socio-economic
disadvantage.   
North Lanarkshire could look to build on its use of community alarm service reviews to carry out
a more holistic in-depth review of a person’s needs. This would allow the service to maintain
and enhance its relationship with the users of the alarm service. 
4.3 Considering questions 4.1 and 4.2 what actions / measures will be put in place before
introducing this policy please provide details. 
Action Timescales Responsible Officer Review details (include
timescales)        
Section 5. Monitoring, evaluating and reviewing
5.1. How will you monitor the impact and effectiveness of the new policy? 
This will be reviewed at the beginning of the transition and throughout the implementation of
the digital equipment. The full project will be subject to a review as in line with North
Lanarkshire’s project management policy. 
Section 6.  Making a decision and sign-off 
Recommendation                            Tick Comment (where applicable,
please give more information e.g.
where to pilot, what
modifications, etc.)
Timescales
Introduce the policy   New policy and procedures will be
put in place once digital
12 Months
Page 51 of 100

Page 52

transformation of the service is
complete
Adjust the policy then
introduce   
Introduce the policy with
justification regarding
potential adverse impact   
Stop and withdraw the policy 
Name of Policy 
Head of Service /Senior Manager sign-off: 
Name  Job title and division/
team 
Date  Signature 
For further information please contact: 
Name: Hugh Holt 
Job title:  Senior Officer
Service: Adult Services
Contact details: Holth@northlan.gov.uk
Page 52 of 100

Page 53

Appendix 2
Weekly Community Alarm Charge   
Local Authority  Weekly Charge 
Additional Charges or
Variances 
Perth & Kinross Means tested   
Borders Means tested  
Highlands Means tested  
West Dunbartonshire £6.50  
Argyll & Bute £6.45  
Angus £5.99
Further £1 Every week for
Telecare Equipment
North Ayrshire  £5.32 £2.60 for Islands
Edinburgh  £6.39  
East Dunbartonshire  £4.85  
Falkirk Council  £4.75  
East Ayrshire  £4.74  
Clackmanshire £4.60  
Stirling £4.60  
South Ayrshire £4.41  
West Lothian  £4.30  
East Lothian  £4.05  
Midlothian  £4.00  
Orkney islands  £4.00  
Glasgow  £3.96  
East Renfrewshire £3.25  
Renfrewshire £3.88  
Aberdeenshire council £3.85  
Aberdeen City Council £3.85  
Dundee City  £3.85  
Dumfries & Galloway  £3.60  
North Lanarkshire  £3.57  
Moray £3.50  
Shetland Islands £3.15  
Fife £3.09  
Inverclyde  £2.90  
South Lanarkshire £2.33  
Comhairle nan Eilean Siar £1.50   
Page 53 of 100

Page 54

Page 54 of 100

Page 55

North Lanarkshire Council
Report
Adult Care and Social Work Committee 
Does this report require to be approved? ☐ Yes   ☐ No
Ref    DF/MF/SS/IN Date 19/09/23 
Home Assessment Team/Discharge without Delay Programme Update 
From  Diane Fraser, Chief Officer (Adult Social Work Services)  
E-mail FraserDi@northlan.gov.uk Telephone 07583114596 
Executive Summary 
This HAT report highlights the background to creating capacity across the health and social
care partnership via the business case funding. It outlines the agreed priorities: prevention
and early intervention, empowering people in our communities and a more efficient whole
system approach. This includes an explanation of the Home Assessment Team (HAT), early
stages of development and plans for further implementation in line with the national
development of Home First. It evidences the multi-disciplinary approach in supporting
hospital admission avoidance and discharge arrangements. Finally, it explains the risks and
challenges and the next steps. 
Recommendations
It is recommended that the IJB PFA Committee: 
(1) Acknowledge the report.
(2) Endorse the strategic direction of HAT and the implementation of HAT across North
Lanarkshire.
(3) Acknowledge the significant development in HAT practice across North Lanarkshire 
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement
(12) Ensure our residents are able to achieve, maintain, and
recover their independence through appropriate supports at home
and in their communities
Programme of Work Resilient People 
Page 55 of 100

Page 56

1. Background 
1.1 In September 2021 the IJB approved the establishment of a Change Fund to create
additional capacity and support the remobilisation and redesign of services post Covid,
to enable the delivery of the Programme of Work for the North Lanarkshire Health and
Social Care Partnership, and to achieve the ambitions set out in the Partnership’s
Strategic Commissioning Plan:
• Do the right thing first time
• Provide a range of community services and supports to people to live well in
connected communities
• Focus on what matters to people
• Be at the forefront of technical and sustainable solutions
• Promote prevention and early intervention
• Ensure North Lanarkshire is the best place to work, volunteer and care 
1.2 Priorities for the use of the Change Fund were identified as: 
1.2.1 Prevention and early intervention, targeting spending on helping people to live healthier
and safer lives and maintaining their independence at home or in the community. This
means less spending is required on hospital or specialist care later. 
1.2.2 Empower individuals and communities, involving them in service design and delivery.
This should result in services that match what people need and want. 
1.2.3 Improve efficiency by adopting a whole system approach to improve and deliver
services. 
1.3 A Winter Planning & Increased Capacity Business Case was developed, and this set
out a total recurring investment of £6.759m in three main categories:
• Assessment and planning capacity
• Direct provision of services and supports
• Infrastructure capacity 
1.4 Home Assessment sits within the first of these categories and is the approach that
North Lanarkshire is taking to implement what is known nationally as Home First. 
1.5 It is recognised that being in hospital disconnects people from their family, friends and
social network and can result in a sense of isolation, loss of confidence and depression.
Older people in particular experience functional decline as early as 72 hours after
admission and are more likely to have an episode of delirium or infection. Every
unnecessary day in hospital increases the risk of an adverse outcome for the individual,
drives up the demand for institutional care and reduces the level of investment that is
available for community support. (PubMed - Swinnerton, Price, ‘Recognising, Reducing
and Preventing Deconditioning in Older People’. 2023). 
1.6 Discharge without Delay (DWD) is a vital component of the Scottish Government’s
Unscheduled Care Programme with a Home First approach fundamental to its success.
The aim is to prevent delay to discharge where an acute medical issue has been
addressed. Reducing delay for people who can be assessed within their own homes
rather than a hospital ward is an essential element of reducing the length of hospital
Page 56 of 100

Page 57

stays and thus releasing unnecessarily consumed capacity. This approach requires a
shift in mind-set to; “Why not home? Why not now?” and has been proven to result in
more positive individual outcomes for people. (SCIE, ‘Hospital Discharge and
Preventing Unnecessary Admission, 2022). 
1.7 North Lanarkshire’s Home Assessment Team, (HAT), is a multi-disciplinary social work,
health and social care resource which applies a whole system approach to planning
and preparation for hospital discharge and admission avoidance by facilitating both
assessment and intervention within each person’s own home. HAT will support by
adjusting the balance of care both at the front door and back door of hospitals. 
1.8 To enable timely discharge from hospital and prevent unnecessary admissions, HAT
provides:
1.8.1 Rapid access to the support that people require to enable them to return home or avoid
admission to hospital. 
1.8.2 Time-limited support to enable an assessment of each person’s immediate and longer-
term support needs in their own home, taking into account and optimising use of
personal and community networks. 
1.8.3 A designated workforce focused on enabling discharge and maximising function in the
home environment by increasing the number of timely post-discharge assessments
and providing a rapid community response to prevent hospital admission. 
1.8.4 A robust discharge pathway for those who require home assessment and rehabilitation
following discharge from both hospital front door and wards. 
1.8.5 Flexibility to deploy the workforce across the sectors. 
1.8.6 Home first conversation to become the norm at every stage of the person’s journey
(Why not home? Why not now?). 
1.8.7 Clear leadership and presence within discharge arrangements services. 
1.8.8 Close links with individuals involved in the Planned Date of Discharge process to
identify appropriate patients for the HAT pathway. 
1.8.9 Close working relationships with Rehab Team, District Nurses, Acute, Allied Health
Professionals, Hospital at Home and Hospital Discharge Support Programme (3rd
sector) with access to the equipment store to support hospital admission avoidance
and discharge arrangements. 
2. Report 
2.1 HAT Roll-out
Phase 1: Wishaw and Cumbernauld fully implemented
Phase 2: Motherwell and Airdrie fully implemented
Phase 3: Coatbridge and Bellshill:
• Coatbridge commenced December 2023 although not fully staffed yet with work
ongoing to progress. 
Page 57 of 100

Page 58

• Bellshill not yet fully operational, but utilising Motherwell-based HAT Home
Support staff to support discharges via HAT. 
2.2  Service Model
• Standard Operating Procedure agreed.
• Workshops held to map pathways, review and agree pan-Lanarkshire referral
criteria with all key stakeholders in the MDT including transfers of care into
reablement, mainstream /longer term home support and rehab services.
• HAT staff accommodation secured in university hospitals and community.
• Induction programme established. 
2.3  Data and measurement
• Data spreadsheet developed to record activity and enable monitoring of
performance and outcomes. This continues to be revised according to activity and
developments. 
2.4  Recruitment
• Recruitment to HAT ongoing to build capacity and roll out across all NL localities.
The pressures within the system regarding workforce are widely acknowledged and
adjustments continue to be made to skill-mix. 
• Several recruitment campaigns have been progressed across health and social
care to recruit across the team including Home Support, Physiotherapy and
Occupational Therapy staff. 
• Several Home Support Workers have expressed an interest in transferring to HAT.
This will be facilitated as soon as their posts have been backfilled.
• It is the intention for existing staff to be able to work flexibly across sectors as
required to meet demands. 
2.5  Leadership and Operational Management
• Interim operational management of HAT has been delegated to two Locality Social
Work Managers, aligned to the 2 hospital sites of University Hospitals Monklands
and Wishaw, and an NHS Service Manager, working closely with the discharge
arrangements and the hospital social work teams. This will be rolled out across the
six localities.
• They are reviewing the operational structure of the HAT and holding regular
meetings with Team Leads including Allied Health Professionals and IRT to take
forward any outstanding work to establish HAT. 
• Strategic management is also undergoing a review to ensure integration into the
new GIRFE/Enabling Approach arrangements. 
2.6 Risks and challenges 
2.6.1 The implementation and embedding Home Assessment practice presents with
several risks. 
Page 58 of 100

Page 59

Risk Mitigation
The release of a substantial number of
Home Support Workers from the
mainstream/longer term service will
impact on the delivery of long-term
home support including disruption of
existing care packages and potential
increase in unmet need
Working closely with in-house home
support and the independent home care
providers across the sector to create the
capacity required to release this
resource.
People are not supported as required
due to ineffective, inefficient and
inconsistent reablement activity
Ring-fenced reablement teams
established to meet need 
Regular weekly Reablement meetings
between Home Support and Rehab
Teams across 6 localities to target
reablement activity and achieve practice
consistency
Lack of trust in HAT process Targeted engagement activities
between HAT, ward and community
staff to develop trust and confidence in
assessment at home
Patients’ outcomes may be poorer due
to deconditioning in the hospital setting
which ultimately leads to increased
dependency on formal supports or
transfer to long term care home
placement
Promote earlier discharge from hospital
and assessment at home
Planned Date of Discharge (PDD) is not
fully embraced
Refreshed PDD process 
Low referral rate to HAT HAT presence in hospital settings to
develop further trust and confidence
Recruitment challenges  Planned, phased and strategic
recruitment
Low Pharmacy input  Ongoing pharmacy input and
medication training across relevant staff
Limited access to pool cars  Further purchase of pool cars
Lack of capacity on Acute sites to
support HAT
Accommodation and space identified for
HAT staff 
2.6.2 Other challenges:
• Timely movement of people into services, if required, including Reablement, IRT,
long-term home support. 
• Funding for non paye costs to be agreed and sourced as not included in the initial
business plan. 
Page 59 of 100

Page 60

Embedding the approach
2.7 As HAT has developed, further synergies have been identified with other key
programmes of work to improve our prevention and early intervention response. This
includes Getting It Right for Everyone (GIRFE), the Frailty Strategy, Home Support
Refresh, the Back to Basics Enabling approach and the Operation FLOW Optimal
Discharge Planning Target Operating Model. 
2.8 The interface with other parts of a person’s journey is critical. Whilst some individuals
will not require any statutory support, there will be those who would benefit from further
intervention. Therefore, while we ensure FLOW through the acute hospital sites, this is
also required within community settings and timely access to reablement, and
rehabilitation will be critical to enable people to maximise their potential and ensure that
they receive the support that is right for them. 
2.9 Reablement provision was significantly impacted during the pandemic due to capacity
and workforce issues. Subsequently, there have been changes within the Home
Support Service and Integrated Rehab Teams (IRT) to ensure that Reablement can be
fully remobilised. This entails a separation of assessment and planning functions,
including Reablement, HAT and IRT, and a long-term “Living Well” Service. 
2.10 Weekly meetings have been established between relevant staff in HAT, Home Support,
Reablement and Rehab Teams to facilitate effective communication regarding
individual service users and reablement activity and subsequent goal setting supported
by a standard operating procedure. 
2.11 Each locality is developing a multi-disciplinary enabling approach to ensure an effective
and timely response that taps into community resources, where appropriate, through
our recently appointed third sector community connectors. 
Next Steps
2.12 Embed HAT across North Lanarkshire whereby Home First becomes the norm in Acute
and Community and align with the Target Operating Model to optimise discharge. 
2.13 Conclude recruitment and complete roll-out across localities. 
2.14 Communication and engagement activities continue including staff briefing sessions. 
2.15 Ensure Lanarkshire-wide referral criteria are widely known. 
2.16 HAT process and patient/service-user pathways used in everyday practice. 
2.17 HAT patients/service users to be discussed on Planned Date of Discharge (PDD) call. 
2.18 Full remobilisation of Reablement. 
2.19 Improved interface with the Equipment Store and Assistive Tech Team and subsequent
service delivery. 
2.20 Ensure HAT is embedded in whole system approach aligned to GIRFE principles and
Back to Basics Enabling Approach.
Page 60 of 100

Page 61

2.21 Undertake a test-of-change in Airdrie/Wishaw which will aim to:
­ Identify the range of preventative and early intervention services.
­ Build on the prototypes developed through the Partnerships involvement in
the national GIRFE Pathfinder Programme.
­ Improve access through changes to first point of contact.
­ Put in place robust screening and allocation through an MDT and enabling
approach.
­ Reduce waiting times through embedding the team around the person,
working to a single, shared plan and eradicating unnecessary referrals. 
2.22 Establish key linkages within the Health & Social Care Whole System Dashboard and 
track wider impacts of the service on Delayed Discharge performance, and capacity of
the Home Support Service
Data on activity impact
2.23 Since its inception in April 2022 to 2nd July 2024, 2,119 patients in total had been
referred to and supported by the Home Assessment Team.
2.24 As illustrated by the chart below, there has been a natural, gradual build and expansion
of the team as staff have been recruited and trained. This is reflected in the gradual
build-up in the volume of referrals. Whilst all localities are not yet fully operational, an
average of 120 new individuals are currently supported by the service every month.
Those people who are referred to HAT are also being discharged quicker from hospital
to be fully assessed in their home environment, with 82% of individuals referred to HAT
and discharged from hospital on the same day. 
2.25 As HAT has become established the team has been able to accept more complex
cases and fully support the multi-disciplinary team working that is required to support a
“Home First” approach for individuals. We can see below that over time, as more
complex cases were being accepted in financial year 2023/24, that the proportion of
people recorded as completing the service with no further service required decreased;
however, we know from our monitoring of delayed discharges that the HAT approach
is improving flow.
Page 61 of 100

Page 62

2.26 Of the those requiring a further service, the service with the highest number was the
Community Alarms Service (16% of total completing). This was followed by Home
Support Reablement (13%), then Integrated Rehab Team (IRT) - Physio and
Mainstream Home Support (both 11%) and IRT – Occupational Therapy (10%). 
Service at Completion
Home Support - Reablement 13% Locality SW Referral 1%
Home Support - Mainstream 11% Integrated Day Service 0%
Integrated Rehab Team - Physio 11% LSS 0%
Integrated Rehab Team - OT 10% District Nurse 6%
Rehabilitation - Other 1% NL Leisure 0%
Community Alarms 16% Third Sector 3% 
2.27 The contribution of the Home Assessment Team also appears to be having an indirect
impact on the Partnership’s overall performance in relation to patients’ discharge being
delayed in hospital. The charts below illustrate the significant reduction in the number
of bed days delayed per week in both acute sites and off-site wards, particularly
towards the end of 2023 and into early 2024.
Page 62 of 100

Page 63

Conclusions 
2.28 This report provides an update on the establishment of HAT in North Lanarkshire, which
includes background, progress to date, plans, recruitment update, successes, risks and
next steps. 
2.29 The delivery of high-quality support is critical to support individuals who are at risk of
admission to a hospital or who have complex discharge needs. The improvement work
to establish the Home Assessment Team (HAT) is critical to the delivery of the Plan for
North Lanarkshire and the University Health and Social Care North Lanarkshire
Strategic Commissioning Plan. 
2.30 HAT provides assessment at home with a focus of complementing established practice
and supporting service redesign and streamlining of other key areas of work including
the longer-term vision of the development and implementation of an enabling hub
approach across the North Lanarkshire Health and Social Care Partnership.
Page 63 of 100

Page 64

3. Measures of success 
3.1  Data spreadsheet developed to record activity and enable monitoring of performance
and outcomes. This continues to be revised according to activity and developments. 
4. Supporting documentation 
4.1 N/A   
Diane Fraser
Chief Officer / Head of Service (Adult Social Work Services) 
Page 64 of 100

Page 65

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
The funding for HAT provided via the Winter Planning & Increased Capacity
Business Case has been incorporated into baseline budgets and as such is part of
routine financial management arrangements.  A funding gap has been identified for
non-PAYE (Pay as You Earn) costs therefore this cost impact requires to be
resolved through the current financial sustainability arrangements.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
To address the risks outlined in this report successful recruitment is required 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
Page 65 of 100

Page 66

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
This is captured in the Home Support Programme Board/Discharge Without Delay
Owner is Karen Workman
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 66 of 100

Page 67

Page 67 of 100

Page 68

Page 68 of 100

Page 69

North Lanarkshire Council
Report
Adult Care and Social Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    RMcG/SF Date 03/09/24 
Adult Social Care Performance Report – Quarter 4 
From  Ross McGuffie – Chief Officer – North Lanarkshire HSCP  
E-mail Ross.McGuffie@lanarkshire.scot.nhs.uk Telephone 01698 858143 
1. Background 
1.1 The Chief Officer has joint quarterly performance review meetings with the Chief
Executive of NHS Lanarkshire and the Chief Executive of North Lanarkshire Council.
These meetings are supported by a Chief Executive Performance Framework
comprising a range of performance measures from across both health and social work
systems, including relevant targets and trajectories. 
1.2 Based on a traffic-light system there are areas for improvement identified within the
performance framework each quarter for those that are flagged as Red or Amber. The
performance review meetings are used as a means for jointly agreeing corrective
actions. 
Executive Summary 
The purpose of the report is to provide an update to the Committee on the performance of
key areas of activity within Adult Health & Social Care for the period 01st January 2024 to
31st March 2024 (Quarter 4). 
Recommendations
It is recommended that the Committee: 
(1) Endorse the improvement actions included within Appendix 2 of the report; and
(2) Acknowledge the performance of key areas of activity within Appendix 1 of the report. 
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Resilient People
Page 69 of 100

Page 70

1.3 Information from these performance reviews has been supplemented with additional
performance information below to offer the committee a wider overview of performance
across some key areas of adult social care delivery. 
2. Report 
2.1 The purpose of the report is to provide an update to the Committee on wider
performance of key areas of adult social care delivery, in addition to the performance
areas for improvement which have been identified as part of the Chief Executive
Quarterly Performance Review for the period 01st January 2024 to 31st March 2024
(Quarter 4). 
2.2 The performance data for Quarter 4 and associated trend information is included as
Appendix 1. 
2.3 Areas for improvement and planned actions are agreed and developed on an exception
basis (i.e., for those indicators which are amber or red, based on tolerance thresholds).
These are detailed as Appendix 2 of this report. 
3. Measures of success 
3.1  Measures of success are contained within Appendix 1 of this report. 
4. Supporting documentation 
4.1 Appendix 1: Adult Social Care Dashboard 
4.2 Appendix 2: Areas for Improvement (Quarter 4, 01st January 2024 to 31st March 2024) 
Ross McGuffie
Chief Officer North HSCP 
Page 70 of 100

Page 71

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 71 of 100

Page 72

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 72 of 100

Page 73

Appendix 1 – Adult Social Care Dashboard 
PLEASE NOTE FOR ALL INDICATORS UPWARDS ARROWS DENOTE POSITIVE PERFORMANCE 
Ref.  KPI Target
2023-24
2022/23 Q4 2023/24 Q1 2023/24 Q2 2023/24 Q3 2023/24 Q4 Performance
Compared to
Previous Quarter
Performance
Compared to
Same Quarter
Previous Year
Current
Performance
2.15 Assistive Technology - Number Of People With
Technology (0-17 yrs)
1,452
30 28 28 31 31  
GREEN 2.16 Assistive Technology - Number Of People With
Technology (18-64yrs) 633 632 631 618 624  
2.17 Assistive Technology - Number Of People With
Technology (65+) 853 818 825 856 858  
2.18
Reablement - Number Of People Completing
Reablement Process
2000
(500
per
quarter) 
1418 376 816 1355 2011   GREEN
2.19
Reablement - % Of New or Increased Home Support
Packages Which Are Reablement 70% 61.2% 64.0% 70.3% 70.0% 60.8%   RED
2.20
Reablement - % Of People With No or Reduced
Home Support Service Required At End Of Process 70% 56.1% 45.8% 48.0% 58.8% 58.5%   RED
2.21 Balance Of Care - % Of People (Age 65+) 45% 42.6% 40.2% 36.7% 34.0% 36.4%   RED
2.22 IEAS - % Deliveries Achieved Within 7 Working Days
Quarterly 80% 51.5% 47.5% 49.9% 53.5% 63.4%   RED
4.2 Complaints Processed Within Timescale (NLC) 85%
68% (Stage
1) 89%
(Stage 2) 
84% (Stage
1) 100%
(Stage 2) 
76.5%
(Stage 1)
57.1%
(Stage 2)
81.3%
(Stage 1)
100% (Stage
2)
92.9%
(Stage 1)
100% (Stage
2)
  GREEN
4.3 Care Home Placements At End Of Quarter - Per 1000
Popn 65+ 24 21.2 21.7 22.0 21.9 22.0   GREEN
4.4 Care Home Placements At End Of Quarter - Per 1000
Popn 75+ 50 44.2 44.9 45.8 45.6 45.9   GREEN
4.5 Care Home - Average Length of Stay  865 870 832 891 835 834   GREEN
4.6 Number Of People With Self Directed Support  1,000 1956 2070 2093 2092 2089   GREEN
4.7 Number Of People With A Direct Payment 240 359 329 342 357 379   GREEN
Page 73 of 100

Page 74

6.1 Community Alarm Service Users 75 Years And Over
Per 1000 Population
Under
Review 187.8 191.8 193.9 196.5 195.8 ... ... ...
7.20 % Of Adult Protection Referrals Passed To Care Team
For Investigation 20% 11.7% 12.4% 14.8% 12.7% 20.1%   GREEN
7.21 % Of Adult Protection Investigations Going To Initial
Case Conference 20% 21.2% 20.3% 10.4% 19.2% 11.9%   RED
7.22 Adult Protection - % Of Referrals With Decision
Within 5 Days 60% 73.4% 76.6% 77.8% 76.3% 81.7%   GREEN
7.23 % of Adult Protection Referrals Which Did Not Go On
To Investigation Or Other Service 50% 71.2% 76.6% 74.2% 75.9% 71.5%   GREEN
9.4 Breakeven Position - Projected Outturn (NLC) >=0
£9.327M
underspend
(Period 12
projection)
3.014m
Underspend
4.304m
Underspend
3.112m
Underspend
£3.331m
underspend ... ... ...
9.6 Sickness Absence (NLC) - days lost per person 9.22 11.96 3.34 6.93 10.29 13.74   RED 
Page 74 of 100

Page 75

Appendix 2 – Areas for Improvement 
1.  Reablement and associated services  Target
2023/24
2023/24 Q3 2023/24 Q4 Performance
Compared to
Previous
Quarter
Performance
Compared to
Same Quarter
Previous Year
Current
Performance
Reablement - % Of New or Increased Home Support
Packages Which Are Reablement 70% 70.0% 60.8%    RED
Reablement - % Of People With No or Reduced Home
Support Service Required At End Of Process 70% 58.8% 58.5%    RED
Balance Of Care - % Of People (Age 65+) 45% 34.0% 36.4%    RED
IEAS - % Deliveries Achieved Within 7 Working Days
Quarterly 80% 53.5% 63.4%    RED
Narrative & Corrective Action
REABLEMENT / HOME ASSESSMENT TEAM
The aim of rehabilitation and Reablement services is to ensure that our residents are able to achieve, maintain, and recover their independence through appropriate
supports at home and in their communities, including preventative approaches, self-management and choice over supports and services. In addition, the shift in the
balance of care toward delivering services by Self-directed Support, allowing people to have greater choice and control in their own lives, requires that further
consideration is required as to the performance indicators that might best represent how the delivery of services is changing. Working in these new ways, there is an
associated increase in system capacity and improvement in patient flow by reducing the occupied bed days caused by Delayed Discharge. 
The development of the Reablement service is interdependent with work to develop Home Assessment Teams, the ongoing Review of Home Support services and the
development of Locality Enabling Hubs. This is further dependent on the work to ensure that Reablement and Rehabilitation practice is cohesive across HAT, Home
Support and Integrated Rehab Teams. Whilst recruitment remains a challenge for such services, with HAT teams not fully staffed and therefore little capacity to mitigate
the impact of any sickness absence and annual leave, significant progress has been made. 
As well as raising awareness and understanding of HAT, the practice of assessment at home and a “Home First” approach embedded in everyday practice, tests of change
are currently underway in UHM (Wards 14 & 20) and UHW (Ward 7) to introduce Non-Prescriptive Referrals for Home Support. This follows analysis of data and
information showing discrepancy between prescribed discharge care plans and the actual care that patients required post-discharge, leading to a reduction in care
provided. 
The purpose of the ToC is to increase the accuracy of Home Support Referrals and improve patient outcomes by adopting non-prescriptive referrals, whereby potential
referrals are screened by Home Support Team Leads and support is delivered on basis of need-led input and available resources are optimised. The Team Leads will be
deployed to proactively identify potential referrals for home care within the ward. Their role will involve providing guidance, coaching, and overall management of the
Page 75 of 100

Page 76

situation, ensuring that the size of care packages is appropriate based on the individual patient's needs. It is hoped that evidencing a reduction in care required and
provided will assist and influence clinicians and Allied Health Professionals to reassess their risk tolerance levels and adapt their approach accordingly. The data,
particularly the outcomes for patients, will be analysed to identify further improvements and the potential to scale the approach. Further work to adopt a model of pre-
PDD interface is planned in the coming months. 
For 2023/24, the longer-term trend was for more service users to complete the Reablement process, however in March there was a reduction in those completing from
previous months. 
Looking at the change in service provision for Q4 following completion of the Reablement process, we can see that in Cumbernauld there has been a long-term trend for
an increase in the number of people completing the Reablement process with no service.
Page 76 of 100

Page 77

The most recent reporting details that the total number of referrals accepted by HAT is 1935. 133 referrals were accepted in April 2024, which is the highest monthly
figure recorded, to date.  The volume of referrals to HAT in a calendar month is now regularly >100; this is the eighth month in the last year that the total accepted
referrals has been over 100. In the last year, Wishaw had 27% of all referrals, with Airdrie, Motherwell and Cumbernauld having between 19% and 22%.  The volume of
referrals for Bellshill and Coatbridge have increased over the last three months with Coatbridge now accepting similar volumes to the more established Motherwell team.
0102030405060708090
Deceased
Decreased Hours
Increased Hours
No Service
Same Hours
Deceased
Decreased Hours
Increased Hours
No Service
Same Hours
Deceased
Decreased Hours
Increased Hours
No Service
Same Hours
Deceased
Decreased Hours
Increased Hours
No Service
Same Hours
Deceased
Decreased Hours
Increased Hours
No Service
Same Hours
Deceased
Decreased Hours
Increased Hours
No Service
Same Hours
Airdrie Bellshill Coatbridge Cumbernauld Motherwell Wishaw
Q4 - Service users completing reablement process by change in service
0
20
40
60
80
100
Cumbernauld - Service users completing reablement process by change in
service
Decreased Hours Increased Hours No Service Same Hours
Page 77 of 100

Page 78

There is little movement in percentage terms for the origin of referrals since the last reporting; overall UHW Wishaw has generated more referrals than UHM.
Monklands 876 45%
Wishaw 1002 52%
Other 58 3% 
The majority of referrals received related to females (59%), with the largest number in the age range 75-84 years old (39%).  Under 65s only accounted for 9% and there is
no one aged under 18 recorded.
Page 78 of 100

Page 79

The majority of cases have up to two Social Care services in place at the time of HAT referral. The largest input service remains Home Support, followed by OT, which is
consistent across the last 12 months. 
95% of people were recorded as completing the HAT process. 37% of those completing HAT were recorded as requiring further service. Some data issues will be
addressed in future HAT reporting, as the definition of ongoing service is being reconfigured to not include referrals being made to other certain services, such as NL
Leisure. At the end of the HAT process 64% required no further service.
Page 79 of 100

Page 80

Significant effort continues to be applied to reduce discharge delays and in Q4, there was a notable decrease in the number of delays with reduction in both onsite and
offsite bed days lost due to delayed discharges. This is a positive trend and more coordinated approach to the work of the Flow Boards and concise monthly planning
should see sustained impacts on overall system performance.
IEAS
Change and Improvement work within the Equipment & Adaptation Service is governed by the Equipment & Adaptation Service (EAS) Governance Board. This ensures
coordinated planning and communication, particularly in relation to performance management. 
Following a recruitment process, a new Equipment & Adaptation Service Manager has been appointed and is now in post, completing an induction process, local training
and familiarisation.
The MICES Replacement Project is on track, with a “Go Live” date of 05/08/24 for ELMS2, to be known as “Lanarkshire Equipment Ordering Service” to replace the
outgoing MICES system. 
A full programme of training is in delivery and the introduction of the new system will facilitate improved management and performance information and easier
integration of data with wider partnership systems. 
2.  Adult Protection  Target
2023/24
2023/24 Q3 2023/24 Q4 Performance
Compared to
Previous
Quarter
Performance
Compared to
Same Quarter
Previous Year
Current
Performance
Service at Completion
HS - Reablement 12%
HS - Mainstream 11%
IRT - Physio 11%
IRT - OT 11%
Rehabilitation - Other 1%
CAS 16%
Locality SW Referral 1%
IDS 0%
LSS 1%
District Nurse 6%
NL Leisure 1%
Third Sector 3%
Page 80 of 100

Page 81

% Of Adult Protection Investigations Going To Initial
Case Conference 20% 19.2% 11.9%   RED
Narrative & Corrective Action 
North Lanarkshire Social Work Services received 798 ASP referrals during Quarter 4 203/24. This represents a decrease of around 10% in comparison with Quarter 4 of the previous year
(from 891 to 798). Despite the overall decrease, we have seen an increase in ASP referrals from Police Scotland and NHSL; Police referrals have increased by approximately 12% and Health
referrals by around 13%. However, we have seen slight decreases in referrals from Scottish Fire and Rescue and NLC Housing when compared with the previous year.
Over the last 12 months, the Care Home sector have generated the greatest number of AP1 referrals, however in Quarter 4 the number of referrals from Care Homes fell by around 40%,
leaving Health as the highest referrer for the period.  Despite this reduction, the Care Home sector remain a priority for our ongoing ASP work to support improvements in both the quality
of referrals and defensible decision making. 
Analysis of the referrals has highlighted that Community based referrals are more likely to progress to ASP investigation when compared to referrals from Care Homes.  Referrals generated
by Social Work and community partners often relate to multiple types of harm but our analysis has identified that self-neglect and hoarding continue to rise; these cases are often complex
and require a long-term, inter-agency response. 
It is important to highlight that the NLC Social Work Adult Support and Protection procedures have been updated.  There are significant changes to the language used in the procedures and
describe how we now view ASP “Inquiries and investigations”.  The service now refers to initial inquires as ‘inquiries without investigatory activity’ and ASP investigations and ASP ‘Inquiry
with investigatory activity’.  Importantly, investigatory activity involves any direct contact with the adult or their legal proxy and as such, it is anticipated there will be a rise in investigatory
activity, which will be reflected in future reports. 
There were 151 ASP inquires with investigatory activity carried out during this quarter, which is a significant increase of 68% when compared to the same quarter last year (increasing from
90 to 151). The data shows that the conversion rate from initial inquiry without investigatory activity to inquiry with investigatory activity is 19% for Quarter 4. The reasons recorded for
inquiry with investigation activity were Psychological/Emotional harm (47), Physical (38), Self-neglect (31), Financial (20), Institutional harm (4) Self-harm (1), Sexual (2), and not recorded
(8). 
From the total of 151 inquiries with investigatory activity, 18 progressed to case conference for further action during Quarter 4, which represents 12% of all investigatory activity cases. This
is a 20% increase from the same quarter in the previous year (15 to 18). In Quarter 4, 2% of the total ASP referrals progressed to an AP Case Conference; this rate is consistent with Q4 in
the previous year. 
Internal audits of ASP records have identified discrepancies between the Social Work Information System and the Locality trackers submitted by senior social workers on a weekly basis.  For
example, SWIS holds records for 18 Case Conferences held for Q4 but Locality trackers indicate that there were 35 Case Conferences held during the period.  Ongoing work will be
completed with colleagues in localities to ensure that required information is recorded on SWIS, accurate records of Case Conferences are stored in SWIS, and performance and
management information is produced. 
3.  Sickness Absence Target
2023/24
2023/24 Q3 2023/24 Q4 Performance
Compared to
Previous
Quarter
Performance
Compared to
Same Quarter
Previous Year
Current
Performance
Page 81 of 100

Page 82

Sickness Absence (NLC) - days lost per person 9.22 10.29 13.74   RED
Narrative & Corrective Action 
Long and short-term sickness absence is managed in accordance with the relevant policies for NLC, with monitoring of policy application managed within each service. 
Page 82 of 100

Page 83

North Lanarkshire Council
Report
Adult Care and Social Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    RM/MD/NL/LH Date 03/09/24 
Revenue & Capital Budget Monitoring Report: Adult Social Care
Period 03: 01/04/2024 to 21/06/2024 
From  Morag Dendy, Chief Officer (Planning, Performance and Quality Assurance)  
E-mail LynchN@northlan.gov.uk Telephone Nicola Lynch, Business Finance
Manager, 07581007187 
1. Background 
1.1 The Council approved its General Revenue Fund Budget on 15 February 2024, and
the Integration Joint Board (IJB) approved its Financial Plan on 27 March 2024.  The
Executive Summary
This report provides a summary of the revenue financial performance of the Health & Social
Care Partnership (H&SCP) – North Lanarkshire (Adult Social Care & Housing) and the
financial performance of the Social Work capital programme.  
The report incorporates the period 1 April 2024 to 21 June 2024 (Period 03) and includes
projected outturn forecasts for the financial year ended 31 March 2025, with major outturn
variances highlighted and explained per the approved Financial Regulations.   
H&SCP – North Lanarkshire (Adult Social Care & Housing) has a gross revenue
expenditure budget of £267.478m and is currently projecting an underspend of £0.271m.  
The Social Work capital programme has a total budget of £2.171m and is currently
projecting a breakeven position. 
Recommendations
It is recommended that the Adult Care and Social Work Committee:
(1) Acknowledge the revenue financial outturn position,
(2) Acknowledge the capital financial outturn position,  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Page 83 of 100

Page 84

approved Gross Expenditure Budget for the H&SCP – NL (Adult Social Care and
Housing) is £267.478m.    
1.2 The Council approved its new 5-year Strategic Capital Investment Programme on 14
March 2024.  Financial Year 2024/25 is the first year of the programme, with £2.200m
approved for Social Work for the current year.  Net reprofiling from 2023/24, results in
a revised budget of £2.171m, as demonstrated by Appendix 4. 
2. Report 
Revenue: Analysis of Significant Variances
2.1 Within Employee costs, the Service currently anticipates an underspend of £6.100m. 
This is in relation to the non-recurring reduction of employer’s superannuation costs,
coupled with slippage in relation to the recruitment of posts across the Service.
2.2 Supplies and Services are anticipated to be overspent by £0.208m.  This is mainly as
a result of an anticipated overspend in equipment and adaptations.
2.3 Transport and Plant is anticipated to be overspend by £0.651m.  This is mainly due to
higher than anticipated costs in relation to staff mileage, coupled with estimated running
costs associated with vehicles for use across the Service.
2.4 Admin costs are anticipated to be overspent by £0.103m and this is as a result of higher
than anticipated spend in Legal fees linked to legal work for ‘Adults with Incapacity’.
2.5 Payments to Other Bodies and Transfer Payments are detailed in Appendix 2.  This
expenditure accounts for £165.081m of the annual budget and is forecast to have an
in-year net overspend of £4.845m (2.9%).  This is primarily in relation to the Care at
Home sector who provide services to individuals via the SDS commissioning
framework.  These projections are demand led and are based on full year costs for both
current clients and those anticipated, therefore projections will alter as the year
progresses, updates will be provided in future reports.  
2.6 The Service anticipates a total over recovery of income of £0.031m.  An over-recovery
of £0.136m relates to returned private sector housing grants and recharge income from
other Council Services, these are both partially offset by an under-recovery of £0.195m
which is mainly as a result of lower than anticipated income from charges for
Community Alarms and Integrated Day Services.
Revenue: Earmarked Reserves
2.7 The Integration Joint Board have reserves of £24.804m for specific Adult Social Care
commitments.  It is anticipated that £4.737m of the earmarked reserves will be used
during 2024/25, with £20.067m being carried forward to 2025/26, as highlighted in
Appendix 3.  All expenditure to be met from reserves are excluded from the outturn
position. 
Capital: Analysis of Significant Variances
2.8 The Integrated Equipment and Adaptation (IEAS) capital programme funds equipment
for individuals and adaptations to properties to allow those individuals to live
independently at home.  The Service currently anticipates a breakeven position.  
Page 84 of 100

Page 85

2.9 Following on from the pandemic, there remain uncertainties in respect of demand and
complexity of need and therefore this budget will continue to be monitored closely and
any forecast movements will be highlighted in future reports.
2.10 Appendix 5 outlines the Service’s total capital budget, outturn position and current
contractual commitments. 
3. Measures of success 
3.1  The Service operates within approved budget resources. 
4. Supporting documentation 
Appendix 1 Revenue – Subjective Analysis 
Appendix 2 Revenue – Payments to Other Bodies & Transfer Payments Analysis 
Appendix 3 Revenue – Status of Earmarked Reserves  
Appendix 4 Capital – Budget Movements 2024/25 
Appendix 5 Capital – Summary Expenditure by Thematic Category     
Morag Dendy
Chief Officer (Planning, Performance and Quality Assurance) 
Page 85 of 100

Page 86

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The Adult Social Care management team will continue to review and implement
management action and initiatives, with the aim of remaining within approved budget
resources. This action will include vacancy management, curtailment of non-
essential expenditure, and maximising income.  This report has been prepared by
service-based Finance personnel in consultation with budget managers, in
accordance with the Financial Regulations. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
Page 86 of 100

Page 87

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
All activities undertaken by the Council are subject to risk, and in acknowledging the
Council’s approved Risk Management Strategy, Services manage these as part of
their overall corporate and service planning processes. The demands and
restrictions resulting from Covid, and the current economic climate has the potential
to impact upon the Council’s ability to provide quality services within approved
budget levels. 
The Service continues to face increasing demand pressures for provision within the
home support, self-directed support and independent care home arenas. To mitigate
these pressures the Service reviews and considers data and trends in relation to
current and anticipated demand on an ongoing basis to underpin projections of need
and cost, and to agree appropriate operational and management action. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 87 of 100

Page 88

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 88 of 100

Page 89

APPENDIX 1
[1] [2] [3] [5] [6]
EMPLOYEE COSTS 90,625,610 84,525,385 6,100,225 FAV 6.7% Anticipated underspend mainly as a result of the non-recurring reduction of employer's
Superannuation costs, coupled with slippage in relation to recruitment across the
Service
PROPERTY COSTS 3,149,721 3,202,249 (52,528) ADV (1.7%)
SUPPLIES & SERVICES 6,031,049 6,239,621 (208,572) ADV (3.5%) Projected overspend in equipment and adaptations and small tools, offset by
underspends in other Supplies areas
TRANSPORT & PLANT 1,788,318 2,439,580 (651,262) ADV (36.4%) Projected overspend in relation to Internal Transport charges and staff mileage costs
ADMINISTRATION COSTS 773,465 877,406 (103,941) ADV (13.4%) Projected overspend in relation to Legal fees and general admin
PAYMENTS TO OTHER BODIES 59,152,485 60,447,181 (1,294,696) ADV (2.2%) Please refer to Appendix 2 for analysis
TRANSFER PAYMENTS 105,929,328 109,479,684 (3,550,356) ADV (3.4%) Please refer to Appendix 2 for analysis
CAPITAL FINANCING COSTS 0 0 0 0.0%
REVENUE FINANCING COSTS 0 0 0 0.0%
OTHER EXPENDITURE 28,858 27,639 1,219 FAV 4.2%
TOTAL EXPENDITURE 267,478,834 267,238,746 240,088 FAV 0.1%
NLC CONTRIBUTION (206,810,962) (206,810,962) 0 0.0%
NLC CONTRIBUTION - HOUSING (2,229,010) (2,229,010) 0 0.0%
INCOME FROM HEALTH (56,465,630) (56,551,847) 86,217 FAV (0.2%)
FEES AND CHARGES (1,428,167) (1,233,122) (195,045) ADV 13.7% Lower than anticipated income in relation to charges for Integrated Day Services and
Community Alarms
OTHER LOCAL AUTHORITIES 0 (3,528) 3,528 FAV 0.0%
BUDGETED USE OF IJB RESERVES 0 0 0 0.0%
OTHER INCOME (545,065) (681,410) 136,346 FAV (25.0%) Overrecovery in relation to returned private sectors housing grants and recharge
income from other Council Services
INCOME (267,478,834) (267,509,880) 31,046 FAV (0.0%)
NET EXPENDITURE 0 (271,134) 271,134 FAV 0.0%
[4]
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Subjective Analysis
Period 03 (01 April 2024 - 21 June 2024)
Adult Social Care & Housing - INTEGRATED
CATEGORY ANNUAL
BUDGET
PROJECTED
OUTTURN
PROJECTED
OUTTURN VARIANCE % VARIANCE ANALYSIS
Page 89 of 100

Page 90

APPENDIX 2
[1] [2] [3] [5] [6]
SDS Framework 1 & 2 105,152,245 108,989,216 (3,836,971) ADV (3.7%) Demand led activity.
Independent Care Homes 46,974,146 48,651,340 (1,677,194) ADV (3.6%) Demand led activity.
Payments to NHS Lanarkshire 2,285,090 2,283,745 1,345 FAV 0.1% Position reflects anticipated in year payments
Non Traditional Respite 335,283 109,999 225,284 FAV 67.2% Position reflects anticipated Locality demand
Other Local Authorities - General 127,909 117,129 10,780 FAV 8.4% Position reflects anticipated in-year demand
Voluntary Organisations & Payments to Other Bodies - Gen 7,936,976 7,843,313 93,663 FAV 1.2% Position reflects anticipated in-year demand
Housing Support (RSL's) 777,083 490,468 286,615 FAV 36.9% Position reflects projected contract levels
Locality Flexibility 218,068 213,992 4,077 FAV 1.9% Position reflects anticipated Locality demand
Private Sector Housing Grants 1,152,378 1,105,028 47,350 FAV 4.1% Position reflects anticipated in-year demand
Medical Fees 122,635 122,635 0 0.0% Position reflects Service's approach to absence management
Other 0 0 0 0.0%
TOTAL EXPENDITURE 165,081,813 169,926,864 (4,845,051) ADV (2.9%)
[4]
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Payments to Other Bodies & Transfer Payments Analysis
Period 03 (01 April 2024 - 21 June 2024)
Adult Social Care & Housing - INTEGRATED
CATEGORY ANNUAL
BUDGET
PROJECTED
OUTTURN
PROJECTED
OUTTURN VARIANCE % VARIANCE ANALYSIS
Page 90 of 100

Page 91

APPENDIX 3
Contract Monitoring Staff 87,351 74,279 13,072 0 87,351
22/23 Saving: Muirpark 27,485 27,485 0 0 27,485
Carers Act 2018 - Support 2,595,745 508,000 2,087,745 0 2,595,745
Social Care Demand risk 12,682,932 531,933 12,150,999 0 12,682,932
Tech digitial Improvements 389,719 180,000 209,719 0 389,719
Increase Advocacy provider 65,667 65,667 0 0 65,667
Discharge to assess/ PDD 109,196 109,196 (0) 0 109,196
Adapations Funding 308,571 308,571 0 0 308,571
Tech Improvements - SWIS 700,000 92,235 607,765 0 700,000
Tech Improvements - Comm Alarms 464,604 16,800 447,804 0 464,604
Tech Improvements - Home Scheduling System 3,698,423 441,455 3,256,968 0 3,698,423
Adult Protection Contribution 50,000 38,299 11,701 0 50,000
MH 2 NL10s 161,633 93,930 67,703 0 161,633
Cost of Living Helpline 359,993 246,985 113,008 0 359,993
HS resilience 656,188 330,361 325,827 0 656,188
Staff Training Academy "grow your own" 1,128,466 372,348 756,118 0 1,128,466
Building Capacity Funding Across The Ip Sector (part of Business Case) 0
The Winter Planning & Enhanced supports Business Case
TOTAL 24,804,931 4,737,622 20,067,309 0 24,804,931
1,318,958 1,300,078 18,880 1,318,958
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Status of Earmarked Reserves
Period 03 (01 April 2024 - 21 June 2024)
Adult Social Care & Housing - INTEGRATED
TOTALDESCRIPTION OF EARMARKED RESOURCE
Approved
Reserve
Total
2024/25 2025/26 No Longer
Required
Page 91 of 100

Page 92

APPENDIX 4
Approved: Year 1 budget (5 year Capital Program 2024/25 to 2028/29) 2,200,000
Reprofiling from 2023/24 (28,677) Included in opening budget Social Work Key Ambition Integrated equipment & adaptations
REVISED CAPTIAL BUDGET 2024/25 2,171,323 0 0 0
Theme
NORTH LANARKSHIRE COUNCIL
Capital Budget Monitoring Report - Budget Movements 2023/24
Period 03 (01 April 2024 - 21 June 2024)
Social Work Capital Programme
BUDGET MOVEMENTS 2024/25 £ Period Division Thematic
Category
Page 92 of 100

Page 93

APPENDIX 5
Social Work: Integrated Equipment and Adaptations 2,171,323 253,852 340,592 1,830,731 2,171,323 0
TOTAL 2,171,323 253,852 340,592 1,830,731 2,171,323 0
UNCOMMITTED FINAL OUTTURN OUTTURN
VARIANCE
NORTH LANARKSHIRE COUNCIL
Capital Budget Monitoring Report - Summary Expenditure by Thematic Category
Period 03 (01 April 2024 - 21 June 2024)
Social Work Capital Programme
Theme BUDGET ACTUAL COMMITTED
Page 93 of 100

Page 94

Page 94 of 100

Page 95

North Lanarkshire Council
Report
Adult Care and Social Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    DF/PMcA/MS/AM Date 03/09/24 
Sundry Debt Write Off 2024 
From  Diane Fraser, Chief Officer /Head of Service (Adult Social Work Services)  
E-mail fraserdi@northlan.gov.uk  Telephone 01698 332001 
1. Background 
1.1 During 2023/24 the Council issued invoices with the approximate value of £117m. 
1.2 Within Adult Health & Social Care there are a number of chargeable services mainly in
the following areas: 
• Home Care Charges 
Executive Summary 
The purpose of this report is to present to Committee a summary of outstanding debtor
accounts which are deemed uncollectable following all attempts at recovery or are
considered uneconomically viable to continue pursuing. In accordance with financial
guidelines a bad debt provision has previously been established for the outstanding
accounts highlighted below.   
Recommendations 
It is recommended that Committee: 
(1) Acknowledge the decision of the Chief Accountable Officer and the Head of
Financial Solutions under delegated responsibilities to write off £140,917.93 for debts
under £500. 
(2) Approve the write off of £19,581.98 which includes debts greater than £500. 
(3) Remit this report to Finance & Resources Committee. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (21) Continue to identify and access opportunities to leverage
additional resources to support our ambitions
Programme of Work Statutory / corporate / service requirement
Page 95 of 100

Page 96

• Nursing Home and Residential Home Accommodation Charges 
• Community Alarms 
• As well as chargeable services, invoices are raised to other local authorities,
health, and universities. 
1.3 The value of Adult Health & Social Care invoices raised during 2023/24 was £59m. This
figure includes invoices raised to other local authorities, health, and universities
(£58m).    
1.4 In conjunction with the corporate debt recovery team, every effort is made to recover
any unpaid debt including reminder letters, the use of collection agents and legal action.
However, despite these steps there are a number of debts that are deemed
uncollectible or are considered not economically viable to engage further collection
activities and costs. This annual process of assessing the likelihood of debt non-
recovery conforms to accepted best accounting practice and is a realistic assessment
of expected income. 
1.5 The Council will continue to seek collection of the outstanding balance if the
circumstances of the debtor alter, and recovery is deemed practical. 
2. Report  
2.1 Analysis of the outstanding balances has been conducted and £160,499.91 has been
identified as uncollectable. 
2.2 There are a number of reasons why the outstanding balances are being written off and
these are summarised below: 
a) Deceased.  The debtor is deceased and there have been insufficient funds
within the estate to meet the sum due. 
b) Small Balances/Uneconomic to Pursue.  There are insufficient funds or no
realisable assets that are available to meet the debt and it is uneconomic to
continue to seek recovery of the sum due. 
c) Gone Away. The debtor has moved address and cannot be located. 
d) Recovery exhausted. Despite all efforts the service has now been informed that
these accounts will not be recovered. 
e) Other.   
2.3 The following tables categorise the value of debt recommended for write off by cause
and value: 
Deceased   13  6,206.03 
Small Balances/Uneconomic to Pursue   6  6,370.19
Gone Away   0   0 
Recovery Exhausted   23  7,875.84
Other 10,008            140,047.85       
Total  10,050 160,499.91 
Value Analysis     
< £500  10,041  140,917.93 
> £500  9  19,581.98
Total  10,050 160,499.91
Page 96 of 100

Page 97

2.4 The value of accounts identified for write off represents a very small proportion of the
accounts raised annually by Adult Health & Social Care.  This is reflective of a number
of activities aimed at improving collection rates, reducing debt arising and streamlining
the recovery process. 
3. Measures of success 
3.1 The Service continues to engage in a number of activities aimed at improving collection
rates, reducing debt arising and streaming the recovery process. 
3.2 These include: 
• Implementation of Debt Recovery Procedures 
• Performance Management Reports 
• Payment Arrangements 
• Payment by Direct Debit 
3.3 The Council will continue to seek collection of the outstanding balance if the
circumstances of the debtor alter, and recovery is deemed practical. 
4. Supporting documentation 
4.1 n/a 
Diane Fraser
Chief Officer / Head of Service (Adult Social Work Services) 
Page 97 of 100

Page 98

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 98 of 100

Page 99

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 99 of 100

Page 100

Page 100 of 100