Argyll and Bute Council
Development and Economic Growth   
PROPOSAL OF APPLICATION NOTICE (PAN)
____________________________________________________________________________  
Reference:  24/00287/PAN 
Applicant: Pegasus Group 
Proposal: Proposal of application notice for proposed 49.9Mw battery energy storage system
and associated infrastructure  
Site Address:  Ichrachan Farm , Taynuilt (Land T West of existing SSEN Substation)
____________________________________________________________________________ 
1.0 INTRODUCTION 
This report informs the Planning Committee of the submission of a Proposal of Application
Notice (PAN). The submission of the PAN accords with the provisions of the Planning etc.
(Scotland) Act 2006. The development which is subject to the PAN is of a scale which will
be an application to The Planning Authority as the capacity of the battery storage facility 
at 49.9Mw, will not exceed 50Mw in total capacity. (Above 50Mw would require a Section
36 Application under the Electricity Act to The Scottish Ministers) 
The submitted information includes: 
• Proposal of Application Notice
• Location Plan
• Copy of newspaper adverts 
The applicant has set out in detail their proposals to ensure sufficient opportunity is
provided for the community to view and comment on the proposals in advance of the
submission of a formal application. The applicants have confirmed in the PAN form that
the following consultation steps will be undertaken: 
• Consultation event with Taynult Community Council (event took place on 19.2.24)
• Undertaking two further community consultation events at Taynuilt Village Hall (
6.3.24 and 3.4.24)
• Advertising events within the Oban Times in advance.( 22.2.24 and 21.3.24
respectively) 
Officers consider that the steps set out in the PAN are acceptable and in accordance with
the requirements of the Regulations to ensure appropriate community consultation is
undertaken prior to the submission of a planning application given the nature and scale of
the proposals.

Page 2

2.0  DESCRIPTION OF PROPOSED DEVELOPMENT 
The applicants propose to submit a planning application for the construction of Battery
Energy Storage System (BESS) of some 49.9Mw together with new access and
associated infrastructure, plant and machinery. 
2.0 SITE DESCRIPTION 
The proposals will be located immediately to the west of the existing SSEN substation at
Taynuilt on adjoining land. The site is bounded on its northern and western edges by the
A85 Trunk Road and therefore discussions with Transport Scotland will be required in
respect of any proposed access off the Trunk Road. 
The application site currently comprises part of a large field used for grazing and is of low
agricultural value. An almost continual band of trees is located along the northern and
western boundary of the site. Immediately to the east is an existing SSEN substation of
similar scale and appearance to the likely development. To the south the land rises
approximately 20-30m on a gentle slope. 
The nearest residential property is Fairy Hill Croft and beyond this to the south west Tugh
Ruach and Burnside. Other residential properties and more distant and to the North East
including Dalnhor, Alt-Na-Dubh and Inverawe Barn. It is estimated that the nearest
residential property, situated on higher ground to the south, is approximately 200m from
the site. 
The proposal is located outside a settlement boundary on land identified as a countryside
location. It is noted that no statutory designations will be directly impacted by the proposed
site and that the site is outside the North Argyll APQ which starts on land across the A85
to the north of the site. There are no known constraints which affect the site. 
3.0 DEVELOPMENT PLAN POLICY 
In considering the merits of this PAN, a number of Development Plan Policy considerations
are relevant. The policies to be considered include: 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 7 – Historic Assets and Places
NPF4 Policy 11 - Energy
NPF4 Policy 14 – Design, Quality and Place
NPF4 Policy 22 – Flood Risk and Water Management
NPF4 Policy 23 – Health and Safety
NPF4 Policy 25 – Community Wealth Building 
Annex B – National Statements of Need
3. Strategic Renewable Electricity Generation and Transmission Infrastructure

Page 3

Argyll and Bute Local Development Plan adopted March 2015 
LDP STRAT 1 – Sustainable Development
LDP DM1 – Development within the Development Management Zones
LDP 3 – Supporting the Protection, Conservation and Enhancement of our Environment
LDP 5 – Supporting the Sustainable Growth of Our Economy 
LDP 6 – Supporting the Sustainable Growth of Renewables
LDP 8 – Supporting the Strength of our Communities 
LDP 9 – Development Setting, Layout and Design
LDP 10 – Maximising our Resources and Reducing our Consumption
LDP 11 – Improving our Connectivity and Infrastructure 
Supplementary Guidance 
SG LDP ENV 1 – Development Impact of Habitats, Species and Our Biodiversity (i.e.
biological diversity)
SG LDP ENV 6 – Development Impact on Trees / Woodland
SG LDP ENV 7 – Water Quality and the Environment
SG LDP ENV 11 – Protection of Soil and Peat Resources
SG LDP ENV 14 – Landscape
SG LDP ENV 19 – Impact on Scheduled Ancient Monuments (SAMs)
SG LDP BAD 1 – Bad Neighbour Development
SG LDP Sustainable - Sustainable Siting and Design Principles
SG LDP SERV 5 – Waste Related Development and Waste Management 
SG LDP SERV 6 – Private Water Supplies and Water Conservation
SG LDP SERV 7 – Flooding and Land Erosion – The Risk Framework for Development
SG LDP TRAN 4 – New and Existing, Public Roads and Private Access Regimes
SG LDP TRAN 6 –Vehicle Parking Provision 
These appear to be the most relevant policies. However this cannot be finalised until such
time as a formal application has been submitted and the details of the proposals finalised. 
Other Relevant Policy Considerations: 
Emerging Local Development Plan (LDP2) 
The emerging Local Development Plan (LDP2) will replace the current Local Development
Plan 2015, once adopted. The LDP 2015 at time of writing remains the adopted Local
Development Plan, however, the Examination Report of the Draft LDP2 is a material
consideration of significant weight and may be used as such until the conclusion of the
LDP2 adoption process. (It is likely that this will form the statutory plan on 29 Feb 2024, 
Policy 02 – Outwith Settlement Areas
Policy 04 – Sustainable Development
Policy 05 – Design and Placemaking
Policy 06 – Green Infrastructure
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design: All Development
Policy 14 – Bad Neighbour Development
Policy 15 – Supporting the Protection, Conservation and Enhancement of Our Historic
Built Environment
Policy 18 – Enabling Development

Page 4

Policy 19 – Schedule Monuments 
Policy 22 – Economic Development
Policy 30 – The Sustainable Growth of Renewables
Policy 35 – Design of New and Existing, Public Roads and Private Access
Policy 36 – New Private Accesses
Policy 37 – Development Utilising an Existing Private Access or Existing Road
Policy 39 – Construction Standards for Private Access
Policy 48 – Developer Contributions
Policy 55 – Flooding
Policy 58 – Private Water Supplies and Water Conservation
Policy 59 – Water Quality and the Environment
Policy 63 – Waste Related Development and Waste Management
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 77 – Forestry, Woodland and Trees
Policy 78 – Woodland Removal
Policy 79 – Protection of Soil and Peat Resources
Policy 80 – Geodiversity 
• ABC Technical Note – Biodiversity (Feb 2017)
• UK Government’s Ten Point Plan for a Green Industrial Revolution (2020), 
• Energy White Paper (2020), 
• Carbon Plan (2011), 
• The UK Renewable Energy Roadmap (2011) (updated 2012 and 2013) and the
• British Energy Security Strategy
• Scotland’s Draft Energy Strategy and Just Transition Plan and the accompanying
Ministerial statement (Dated 10.1.23)
• The Scottish Government’s Policy on ‘Control of Woodland Removal’ (Forestry
Commission Scotland 2009) 
• Views of statutory and other consultees; 
• Planning history of the site 
• Legitimate public concern or support expressed on relevant planning matters 
5.0 POTENTIAL MATERIAL CONSIDERATIONS 
In respect of this proposal, it is considered that the following matters will be material
considerations in the determination of any future planning application: 
a) LDP 2
b) National Energy Policy Objectives;
c) Community and Socio Economic Benefits;
d) Roads, Transport and Access;
e) Flood Risk, Water Quality and Drainage;
f) Fire Management Plan
g) Access  from Trunk Road
h) Natural Heritage and Biodiversity enhancement
i) Built and Cultural Heritage;(Ancient Monument)
j) Design and Layout;
k) Landscape integration and Visual Impact 
l) Noise (During charging and discharging and associated with cooling fans)
m) Any other material considerations raised within representations.

Page 5

6.0 CONCLUSION 
The report sets out the information submitted to date as part of the PAN. Summarised are
the policy considerations, against which any future planning application will most likely be
considered as well as potential material considerations and key issues based upon the
information received to date. The list is not exhaustive and further matters may arise as
and when a planning application is received and in the light of public representations and
consultation responses. 
7.0  RECOMMENDATION 
That Members' note the content of the report and submissions and provide such feedback
as they consider appropriate in respect of this PAN to allow these matters to be considered
by the applicant’s in finalising any future application submission. 
Author of Report: David Moore     Date: 23.02.2024 
Reviewing Officer: Sandra Davies      Date: 8.03.24 
Fergus Murray
Head of Development and Economic Growth