Democracy Spraffa

Agenda Document Pack - Adult Care and Social Work Committee - 13/05/2025

North Lanarkshire Council · 13 May 2025
Back to Adult Care and Social Work Committee — 13 May 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

2 May 2025 
Members of the 
Adult Care and Social Work Committee
Chief Executive’s Office
Rachel Blair
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk 
Notice is given that a Meeting of the Adult Care and Social Work Committee is to be held
in the Council Chamber, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on Tuesday,
13 May 2025 at 14:00 PM which you are requested to attend. 
The agenda of business is attached. 
Rachel Blair
Chief Officer (Legal & Democratic) 
Members : 
Clerk Name: Karen Swan
Clerk Telephone: 07919 730272
Clerk Email: committee@northlan.gov.uk 
M McCulloch, A McCrory, C Barclay, B Baudo, M Boyd, G Brennan, B Burgess, J Cairns, W
Goldie, H Gray, M Hughes, J Jones, P Kelly, K Larson, B McCulloch, R McKendrick, C
McManus, C Quigley, N Shevlin, L Stubbs, R Sullivan, J Toner, C Williams, N Wilson, G
Woods.  
Page 1 of 74

Page 2

Page 2 of 74

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical
Standards In Public Life Etc. (Scotland) Act 2000   
Performance   
2 From Back-to-Basics to Getting It Right For
Everyone
Submit report by Chief Officer (Planning, Performance
and Quality Assurance) outlining the work being taken
to getting it right for everyone in North Lanarkshire with
reports being provided to future committee cycles
detailing the overall approach. . 
5 - 26 
3 Adult Social Care Performance Report – Quarter 3
2024/25
Submit report by Chief Officer (HSCP) (copy to follow) 
Financial   
4 Revenue & Capital Budget Monitoring Report:
Adult Social Care Period 12: 01/04/2024 to
28/02/2025
Submit report by Chief Officer (Planning, Performance
and Quality Assurance) providing a summary of the
revenue financial performance of the Health & Social
Care Partnership (H&SCP) – North Lanarkshire (Adult
Social Care & Housing) and the financial performance
of the Social Work capital programme, for the period 1
April 2024 to 28 February 2025. 
27 - 38 
5 Health & Social Care Partnership Medium Term
Financial Plan 2025/26 – 2027/28
Submit report by Chief Finance Officer ( HSCP)
outlining the challenges and opportunities for the
partnership over the coming 3 years along with details
of the Long Term Financial Outlook which estimate the
longer-term financial position in respect of funding
levels and rising costs and demands. 
39 - 62
Page 3 of 74

Page 4

6  Charges for Non-Residential Services, Community
Alarms, Meals Provision, Independent Sector Care
Homes & Respite Care
Submit report by Chief Officer (HSCP) advising of the
charging levels to be applied for non-residential
services, community alarms, meals provision,
independent sector care homes and respite care in
2025/26. 
63 - 68  
Contracts   
7 Contracts awarded below Committee approval
threshold
Submit report by Chief Officer (Assets and
Procurement) notifying of the contracts awarded since
the last meeting of the Committee with a value below
the financial threshold requiring approval. 
69 - 74 
Page 4 of 74

Page 5

North Lanarkshire Council
Report
Adult Care and Social Work Committee 
Does this report require to be approved? ☐ Yes   ☐ No
Ref    MD Date 13/05/25 
From Back-to-Basics to Getting It Right For Everyone 
From  Morag Dendy, Chief Officer (Planning, Performance, and Quality Assurance)  
E-mail dendym@northlan.gov.uk Telephone 
1. Background 
1.1 The landscape of health, social work, and social care is changing.  Demographic
changes and increasing pressure on financial resources including the impact of
changes in the cost of living, means that “more of the same” is not the right response.
Executive Summary 
The landscape of health and social care is changing and services, supports and
responses need to change to continue to improve the lives of people who live in
North Lanarkshire and who work in North Lanarkshire. This report sets out the work
that has been done to adopt a human learning approach, to focus more on people
and less on systems and process to use resources to their best effect and make
the most positive impact on lives. The report outlines the next steps and key actions
for 2025 and sets the context for future reports giving specific detail of how different
services and supports are changing to work effectively within the whole system,
place-based approach.   
Recommendations
It is recommended that the Adult Care and Social Work Committee. 
(1) Endorse the approach being taken to getting it right for everyone in North Lanarkshire,
including the public and staff
(2) Anticipate that there will be a range of reports to future committee cycles that provides
detail to the overall approach  
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement
(12) Ensure our residents are able to achieve, maintain, and
recover their independence through appropriate supports at home
and in their communities
Programme of Work Resilient People
Item 2
Page 5 of 74

Page 6

A whole system approach is not only desirable but essential. This report explores what
is being done locally to focus on people, on learning how to get it right first time by
intervening early and effectively, responding proactively rather than in crisis, and
working whole system. 
1.2 The 2022 census provides important comparisons to the 2011 census which
demonstrate the potential for demographic change to overwhelm services and supports
without change to the approach: 
• Between 2011 and 2022, the 25 to 44 age group saw a percentage decrease (-
7.3%), in contrast the 75 and over age group saw a percentage increase (+21%). 
• Although the population is projected to decrease from 2028 to 2043 by 1.2% there
is a forecast increase of 71.4% in the age group 75 years and over across the
same timescale.
• 20% of North Lanarkshire’s data zones are within the 20% most deprived in
Scotland.
• Individuals who reported themselves as “not in good health” has grown by 24.6%
(+6039).
• Individuals who reported themselves as ‘in fairly good health’ as opposed to ‘good
health’ has grown by 15% (+7036).
• Individuals who reported themselves as having ‘long term health conditions’ has
grown by 30.6% (+43,943).
• Individuals self-reporting mental health issues has grown by 158.6% (+24,903)
• Individuals self-reporting as providing informal / unpaid care has grown by 31.6%
(+10,877). 
1.3 The Integration Joint Board approved the Strategic Commissioning Plan 2023-2026 at
its meeting on 22 March 2023, setting out how the Health & Social Care Partnerships
plans and delivers services for North Lanarkshire over the medium term and how these
arrangements help to contribute towards achieving the national health and wellbeing
outcomes through focus on five core strategic ambitions:
• First-time resolution
• Prevention-focused community partnerships
• Future-ready workforce development
• Enhanced mental health and wellbeing support
• Whole family approach
1.4 As previously reported, the partnership has been adopting a learning as management
approach, also known as a Human Learning System approach, working with academic
and national partners including Healthcare Improvement Scotland to make learning and
experimentation the key driver of our work. This paper provides more information to
Committee of the approach taken and anticipates a range of papers to follow in future
cycles with the detail relating to specific services and responses.
2. Report 
Enabling Approach 
2.1 A key element of the learning approach has been the development of a Whole System
Enabling Approach strongly embedded within each of the six locality teams, sometimes
described as a place-based approach.
Page 6 of 74

Page 7

2.2 Overarching this work is making sure that when people contact our services the
response is quick and effective, with a focus on helping people to help themselves first. 
2.3 By focusing on a back-to-basics approach, the simplicity of Assess, Plan, Intervene or
Deliver then Review has helped to strip back and value the key tasks. 
2.4 We know from national and local participation and engagement, and most recently as
part of the Scottish Government Getting It Right for Everyone pathfinder work, through
engagement sessions, that people want a quick and effective response which involves
telling their story once. North Lanarkshire is a Getting It Right for Everyone pathfinder
lead for frailty.
2.5 To support this approach, we operate a fair and equitable arrangement to accessing
services building on the values of Getting it Right for Everyone:
• I have the information I need to make decisions about my own life
• The people who support me take the time to listen and understand me
• What matters to me and my choices will be respected
• Kindness, dignity and respect are the foundation of my health and social care
• People work together with me to share information and understand how to
support me well
2.6 Our Enabling Approach helps us understand and consider how all parts of the Health
and Social Care system interact and influence each other. We want to support people
to thrive by providing targeted services that are tailored to reflect their diverse needs.
Keeping people central to the decisions that affect them helps us plan actions that
support positive outcomes for those who access our services. By adopting a “sticky
person” approach, which is to identify a lead person not only to assess need but to
engage others to ensure the right response where needed, rather than pass on, we can
safeguard against long waits, by waiting well and getting to the right response quickly.
This approach builds confidence and trust between people and practitioners which
enhances the quality of work done to achieve outcomes.
Principles informing the Enabling Approach
2.7 The importance of leadership in implementing an enabling approach is paramount. We
want to operate on principles rather than rules and recognise the importance of
relationships and trust. The principles noted below have been developed and refined
through the active engagement with locality leaders of health and social care services
over the last 18 months. 
2.8 Do no harm – recognises the importance of getting the support for people right, too
much as well as too little support can be harmful and reduce rather than increase or
maintain people’s abilities and independence.
2.9 Home First – why not home, why not now underpins the approach to supporting people
home from hospital at the earliest opportunity, as well as maintain people at home as
far as possible.
2.10 Empower people – a robust focus has been on how we help people help themselves
first. Access to good information, self-management and self-care as well as self-
assessment. 
2.11 Focus on prevention – as resources become tighter it is sometimes hard to protect
the responses focused on prevention, but responding before people reach more difficult
Page 7 of 74

Page 8

circumstances is not only better for the person and their family, it is a cost-effective
intervention. Yech solutions, minor adaptations and equipment often become a key
change for people managing well in their own home.
2.12 Whole system – has been a key focus of the work. Working as a place-based team of
people across sectors including the community and voluntary colleagues as well as
independent sector providers. The focus has been on building relationships, building
strong virtual teams and making best use of responses together.
2.13 No waits – creating a “no wrong door” approach to accessing the right response when
it is needed, not just having a person’s name added to a waiting list. The driver to this
work has been on improving the lives of people in North Lanarkshire and their families,
but it has also been on improving the working lives of staff. A key factor to achieving
this as a reality for both is being able to respond at a time that makes sense, when
people reach out, without having to wait for a service or response. The use of
Community Hubs, open access, good triage, excellent outward facing information, are
all leading to an improved picture of responding now. 
2.14 The Practices, Principles and underpinning Values have been captured in the graphic
below: 
Values
 I have the information I need to make decisions about my own life
 The people who support me take the time to listen and understand me
 What matters to me and my choices will be respected
 Kindness, dignity and respect are the foundation of my health and social care
 People work together with me to share information and understand how to support
me well
Locality Enabling Approach
2.15 By clearly defining the journey for people accessing services, we can provide better
clarity across the whole system on the route from referral to assessment and through
to service delivery including in-house provision or commissioned services. 
Practices
 Assessment
 Planning
 Intervention/delivery
 Review 
Principles
 Do no harm
 Home first
 Empower people
 Focus on prevention
 Whole system
 No waits 
Page 8 of 74

Page 9

2.16 Journey Map 
2.17 The overall ambition is to have a system that is streamlined, supports fewer repeat
actions and touch points/onward referrals for people and makes best use of resources
by using them in a more effective and productive way. This will ensure that not only are
we offering people the right support, at the right time, and so increasing their quality of
life, we are also increasing the quality of experience for staff in work satisfaction. To
achieve this across the whole system, each locality will be responsible for their local
population, which means decisions will be made closer to people. This approach will
help support robust connections across all local stakeholders to Locality Planning
Groups (LPGs), Local Outcome Improvement Plans (LOIPs) and Community Boards
(CBs). 
2.18 Referral and Screening Pathway To realise our ambition, we need to understand
how people currently access services through the variety of referral pathways that
exit.  Work is currently underway to review and establish a clear pathway that works
for everyone. 
2.19 Risk and Prioritisation National standards are in place to support the criteria around
risk and prioritisation. The categories defined within those standards are critical;
substantial, moderate and low.  To ensure resources are directed at those in most
need or at most risk, people with needs assessed as moderate or low will be offered
advice, guidance, support with income maximisation and signposted to universal,
community or voluntary services. This will avoid unnecessary waiting lists and ensure
people continue to maximise their own independence 
2.20  Applying an Enabling Approach To ensure the right approach to understanding and
meeting an individual’s identified need, each locality has introduced an enabling
approach. As we transition to this Locality Enabling Approach, teams started from
where they were at and refined the approach as it developed over 2024. Across all six
localities, to support and operate a Locality Enabling Approach, stakeholders operated
as a multi-disciplinary team, to facilitate comprehensive assessments by ensuring good
conversations that enables clarity about how people will achieve their outcomes, that if
Page 9 of 74

Page 10

required can be included in robust support planning for people in the locality to reach
the right support, at the right time. By scoping and using the full range of people and
financial resources available within and available to that locality, reducing hand offs and
multiple actions around a person, there is capacity to respond quickly and effectively. 
There is a focus on how teams, team leads and practitioners across stakeholders work
increasingly more effectively together. 
2.21 The Enabling Approach has considered how best to organise for regular assessment,
connecting at least weekly for resource allocation, with the frequency of meetings
ultimately determined by demand.
2.22 The Enabling Approach will have a clear focus on assessment and on resource
allocation. Membership has included (when required) representation from the following
disciplines/teams:
LSWM  IDS 
Health Service Manager LSS
Home Support SDM Education & Families
Quality Assurance Senior Nurse
IRT/OT lead Pharmacy 
HAT Senior Social Worker Community Connectors
Access  Hospital at Home
Resource Worker (Tech
Team)
Hospital Social Work
Quality Lead GP Health Improvement 
2.23 Resource Allocation As important as the focus on assessment is determining and
accessing the right support, at the right time that maximises outcomes for people,
ensures consistency and helps people to remain at home for as long as possible. 
2.24 Resource allocation is considered when an assessment has identified a need for
ongoing supports.
2.25 Resource allocation is about how services are used to their best effect within each
locality but also relates to the process of identifying an individual budget where this is
evidenced as required through assessment.
2.25 An individual budget is designed to facilitate planning which empowers people to
achieve choice and control in their own lives, there should be an openness and
transparency about the financial resource or individual budget available to them to
organise their support. The Enabling Hub will also be responsible for local decision
making currently undertaken through the Locality Enabling Group and Social Work
Enabling Group process. Both of these forums are now deleted from each locality. 
2.26 Consideration in the future can be given to creating a Provider Alliance in each
locality, to work with locality teams to plan and allocate where resource is required
and/or will be more effective. This will support decision making closer to people and
support financial oversight at locality level. 
2.27 Involving People Participation and engagement with individuals, their carers and
families, communities and our partners is important to us and keeping people central
is paramount to getting it right for everyone. The process of assessment, care planning
and review is a joint effort, based on collaboration and communication with the person
at the centre. The process must also take account of their carer/family views and
understand what contribution they can make to supporting the person. The person’s
Page 10 of 74

Page 11

own priorities and preferences on how their needs might be met and the resources
available to them, must be evident. Where possible, people should have a choice about
how their needs will be met.
2.28 Maximising Income Most people will not need an individual budget to live well at home
as their personal resources, family friends and community resources already help meet
needs, or can be mobilised to do that.  There needs to be a robust focus on maximising
personal resources to increase choice and control for a person and their family.
Supporting people to maximise their income where possible, should be a feature of
every social work intervention. This approach is especially important to ensure that
resources are focus on those in greatest need. People with low level need and those
with need that does not require social work support will be signposted to alternative
resources. In addition to prompting people to check benefit entitlement, staff should
direct people to the Tackling Poverty Team, for more specialist assistance, as
appropriate.
The Enabling Approach supporting change 
2.29 Supporting change is critical to the health and wellbeing of individuals and supports
progress towards positive outcomes. To support people effectively, we need to listen,
understand their needs and communicate the benefits of change clearly. Through a
series of available interventions noted below, we can support recovery.
Early Intervention & Prevention
2.30 Early Intervention and Prevention can positively influence health and wellbeing by
preventing or delaying health and other problems arising or getting worse. Operating
on the principles of Getting it Right for Everyone and taking a Human Learning System
approach creates opportunities to develop teams, work across the whole system rather
than in silos, support decision making closest to the person and help practitioners
remain autonomous and accountable.
2.31 There will be some people whose needs are changing frequently or rapidly and whose
level of service will need to change accordingly. Where current assessment places
need in a category that would not warrant services being provided, consideration
should be given to provision as a preventive measure or in anticipation of an imminent
need for increased service, rather than wait until the situation deteriorates. This applies
particularly when admission to hospital or a care home.
The role of the practitioner with closes contact to the person
2.32 The role of the practitioner is to work alongside people to help them build resilience,
maintain hope and optimism and develop their strengths and abilities. Practitioners
must meet people on their own terms, in their own environment whilst retaining the
professional detachment needed to help people who use services to understand, come
to terms with or change their behaviour.  The quality of the therapeutic relationship
between practitioner and individual or family is critical to achieving successful
outcomes. The therapeutic approach and the working alliance that goes with it are key
elements in developing a personalised approach to helping those with the most
complex needs gain control of their lives and find acceptable solutions to their
problems.
Integrated Rehabilitation, Home Assessment and Reablement Teams
Page 11 of 74

Page 12

2.33 The locality-based teams are made up of a variety and health and social care
professionals who provide a change focus to people in their own homes or to facilitate
return to their own home. Focusing on rehabilitation and reablement, direct support can
also be provided to individuals for a relatively short time to support change. This teams
contribute to the assessment process by observing and supporting individuals within
their own home, to determine the potential to maximise the individual’s ability rather
than observing ability while the person is in an unfamiliar setting such as hospital or a
care home.
2.34 Following this assessment at home, the assessing practitioner will either cease support
if assessed as not required or may determine that further reablement support or longer-
term supports may be needed and will define the need going forward.
Intensive Support Team
2.35 For a limited time this team provides intensive support to enable stability, more in depth
assessment and help from staff with a particular skill set. The intensive home support
team will work alongside existing home support already provided. It will augment the
existing service rather than replace it. This team can consider specifically in
circumstances where:  
• Last weeks of life care is required.
• There is significant risk of readmission to hospital.
• Support needs require co-ordinated multidisciplinary packages.
• Short term this team will complete a full assessment in complex, unstable or
contentious situations.
• Where vulnerable people have complex care needs with little or no other natural
support networks.
• Supporting the prevention of admission to care home/hospital when this can be
avoided and is the expressed wish of the service user.
• Supporting people at points of crisis e.g., Carer breakdown.
• Where a person is reluctant to engage with existing support services.
• There is a need for continuity of care for a person that moves from longer term to
intensive and back again.
• Planned hospital discharge where there is a clear assessed need for this specific
type of intervention. 
• Limited natural supports result in a requirement for more flexible home support 
Assistive Technology
2.36 The Assistive Technology Team help people and services to ‘think tech first’. The team
works across North Lanarkshire’s six localities to provide technology solutions to help
people live independently, and safely, in their own home. The team researches and
advises on self-purchased equipment as well as council provided equipment. They also
provide a person-centred evaluation and advice. 
Community Nursing
2.37 District Nurses, Community Mental Health teams and assistant practitioners provide a
further layer of support for the multi-disciplinary teams working in the community. They
are vital, highly valued members of the community health and care workforce,
supporting the rising demands for community services, assistant practitioners bridge
the gap between healthcare support workers and registered nurses.
Page 12 of 74

Page 13

GP and Pharmacy
2.38 GPs are often the first point of contact for people experiencing difficulties. Whilst their
role is crucial in clinical assessment, the multidisciplinary team and the local teams
working as an enabling team, offer much more flexibility and responsiveness as part of
the whole system. Community pharmacies provide a range of local services to meet
the needs of the local population. They help by improving healthcare access for the
public as they do not need an appointment to see their pharmacist, meaning people
can access advice and assistance quicker. They support GPs by providing Minor
Ailment, Public Health, Acute & Chronic Medication Services, thus freeing up GPs to
see patients with more serious complaints.
Community Support
2.39 Carers are entitled to an Adult Carer Support Plan (ACSP) or a Young Carer Statement
(YCS). We recognise that unpaid Carers of all ages play a vital role in the lives of the
people they care for, and we are committed to supporting Carers to ensure they can
continue to provide that care for as long as they wish. A range of supports are delivered
via our commissioned services. In addition, there are several initiatives included Carer
Breather, the Hospital Support Programme and Short Breaks.
2.40 Advocacy plays a vital role in helping to safeguard people who may be at risk of being
treated unfairly because of individual, social, and environmental circumstances that
make them vulnerable and is available to anyone who needs it.   Our commissioned
independent advocacy services support people to have their voices heard and their
rights and interests protected. 
2.41 Community Connectors support vulnerable people in the community.  Community
Connectors promote local opportunities for and with people, avoiding the need for more
formal services for longer. The Community Connectors also play an important role in
the transitional arrangements for people at the point they may need more formal
responses from the HSCP. The approach supports conversations with Older Adults,
Younger Adults and Carers and ensures a link to the Community Consortia. 
2.42 Community Solutions is a cross-sector health and social care investment and
improvement programme for North Lanarkshire, which directs resources to local
community organisations to help improve people’s health, wellbeing, quality of life and
equality. These community-led initiatives build community, family and individual
strengths and resources and have a focus on prevention and early intervention. 
Health Improvement
2.43 The Health Improvement team strives to improve the health and wellbeing of individuals
and communities by creating healthier opportunities, as well as addressing underlying
influences on health such as poverty, discrimination and social isolation.
2.44 Working alongside NHS staff, local authorities, and third sector organisations and
groups within the community, the team addresses health inequalities and improve the
health and wellbeing of the Lanarkshire population, with the most vulnerable
communities at the core of the discipline.
The Enabling Approach - Support Planning and Service Delivery
2.45 The right type of Service Delivery should be identified through robust support planning,
following assessment. The planning process in organising support should be built
Page 13 of 74

Page 14

around the persons wishes, needs and aspirations. People should be in control of the
support they need to live the life they choose, so where relevant an individual budget
should be considered. 
2.46 Where appropriate and following assessment, support can be delivered within the
community, utilising universal, community and voluntary services and therefore
maximising people’s independence.
2.47 When it is assessed that a person’s needs require support from an ongoing service,
the following may be relevant. 
In-House Home Support Service
2.48 Home support is a critical service that enables people to live at home for as long as
their health and social care needs permit. To ensure that citizens in our communities
are allocated the right support at the right time the service must safeguard capacity to
provide this to those people who have been assessed as having critical or substantial
priority need. Demand for social care is high therefore criteria is crucial to manage
demand thus ensuring that available resources are utilised effectively to deliver the
right support to the right person at the right time.
Commissioned Services – Framework Providers
2.49 Commissioned services provide support to individuals in line with the Self-Directed
Support Framework and help people to understand and manage their individual
budgets. Individual budgets are designed to be flexible so that support can be arranged
in a way that meets the persons’ outcomes and promotes greater choice and control
on how someone is supported to live at home. Care at Home Providers support people
with all aspects of personal care, continence support, eating, drinking and medication
assistance.
2.50 With older adults specifically, their needs and circumstances can change frequently. In
these instances, we need to better promote the level of flexibility in utilising a proportion
of the allocated budget to meet immediate need. Individual Budgets are designed to be
flexible, with payments made over 13 equal instalments to allow for short term
variances. Training should be re-established to emphasise support should be delivered
around the needs of the person rather than be task orientated.
2.51 Utilising the revised GSA to accurately reflects a price point that creates stability in the
system, supports market facilitation, provider sustainability and offers choice and
control for people in relation to their support.
2.52 Consideration to source a Provider should also be given when:
• A person who has been assessed as requiring longer term support requests this
as an Individual budget. 
• Where all other options have been explored and there remains unmet need to
support with light housework, shopping, or regular laundry tasks. 
• Where periods of respite are assessed for a carer break.
• Support is required to manage or attend appointments, provide support to assist
with pet care or provide supports to reduce social isolation. 
• Where specialist knowledge or skills are required and extended visit times are
identified   
Page 14 of 74

Page 15

Direct Payment
2.53 If a person has been assessed as requiring community care services, they may be able
to choose to receive payments instead of the services. This is a Direct Payment and
allows a person to receive cash payments from their local authority instead of care
services. This can offer the person much more flexibility and greater control of the
support package as they can use it to arrange their own care services.
Integrated Day Service
2.54 Integrated Day Services comprise of staff from health and social care working together
to provide care and support for older people, recognising that older people often have
complex and overlapping needs that require support, care and treatment from a range
of professionals at the same time. Carers are actively encouraged to be involved in
developing and providing support for the person on an individualised basis. The service
may be provided as support through our outreach respite-at-home service or at an
integrated day service centre.
Locality Support Service
2.55 Locality support services assist people to be as independent as they can be in their
community: to travel independently and to access services, activities and facilities in
their local area. They support people to identify and work towards goals or outcomes,
have greater independence and to lead healthier, safer, happier lives. Support to live
independently can include learning to manage money, staying safe and well at home
and thinking about technology and equipment to replace direct support from someone
who is paid to provide support with tasks.  The team are well connected and can
support people to access services that provide support into employment, groups for
people with an interest and opportunities for health improvement.
Care Home
2.56 Care homes in North Lanarkshire are commissioned to provide residential or nursing
care, or both and have staff on duty 24 hours a day to look after residents. They provide
accommodation and personal care for people who need extra support in their daily
lives. Many care homes provide specialist services for those who require higher levels
of care.
The Enabling Approach - Reviewing and Care Management
2.57 Assessment, care planning and review are all captured within the term 'care
management'. Each locality is responsible for their local population, ensuring
appropriate care management processes are in place. 
2.58 One robust single assessment/ reassessment/ review process that clearly sets out
ongoing care management should be in place to ensure we operate within the
principles of Getting it Right for Everyone and keep people central and included in
decisions that affect them. Having a robust assessment and planning process will
ensure people get the right support at the right time and by undertaking reviews in an
appropriate timely manner, we will ensure oversight of complex cases or protection
concerns and that reviews are person centred and financially robust.
2.59 Our current approach to allocating provision has been described as too paternalistic.
We need to work together to change the culture and avoid a continuation of the current
process, which is more reflective of a tick box exercise.
Page 15 of 74

Page 16

2.60 Outstanding and future reviews across our in-house home support service should be
managed and actioned by the home support teams. 
What we are learning from the Enabling Approach
2.61 The Healthcare Improvement Scotland reflection on our journey is attached at appendix
1 and demonstrates the achievements since the beginning of 2024.
2.62 The key learning points over the last year are summarised as:
2.62.1 Right first time: If we join up our responses and think about getting it right for people
rather than simply moving people through a range of services and supports, there are
better outcomes for people, less pressure on induvial services, and a general feeling
of being better.
2.62.2 Culture: Culture has been a significant focus in 2024, and the benefits are reflected in
the building of relationships, trust and improved discussions in relation to people.
Developing a more detailed operating procedure with the shift in culture will make much
more sense of focusing on getting it right for everyone.
2.62.3 Language: Language is important. In this report you will have read reference to whole
system enabling approach, placed based approach, enabling approach, getting it right
for everyone and back to basics. The language used most frequently within services is
back-to-basics. We recognise the need to use plain English / everyday language
because it works better to describe what we want to achieve and how we will do that.
We are seeking to move the language from back-to-basics to getting it right for
everyone on the basis that we should be doing the basics and more, and we should be
aspiring to getting it right for everyone. There is a propensity in health and social care
services to use acronyms, we are also keen that the getting it right for everyone
approach is not shortened to GIRFE to keep it accessible and logical.
2.62.4 Communication Plan: A communication Plan is being finalised to support the ambition
described in the report including the language, aspiration and operation to achieve
change. The comms plan will address the need for public communication as well as
how to inform and empower staff.  
2.62.5 Confident practice: The quality of the relationship with people and their families,
determines the success of the interventions that follow in achieving the lifestyle people
want and in meeting their needs. Practitioners want to work with autonomy, flexibility
and creativity. A refreshed programme of training and development of assessment
practice is underway and will be rolled out across the health and social care partnership.
2.62.6 No Waits: No waits is something that enthuses staff as well as the public. It incorporates
the work in relation to no wrong door, work across the seven days of the week and into
the evening, and the use of community hubs. The ambition will see changes in the
short, medium and longer term in relation to reaching out and responding differently.
2.62.7 Technology in business and in care: Changes to business systems will improve how
information is recorded, accessed and analysed, increasing the opportunity for robust
data led decision making. Tech in care is making a significant different and is often
reflected on in engagement session with locality staff. The potential to increase the use
of high-street and more bespoke tech to enhance people’s lives will continue to grow
and develop at an exciting pace. The tech team supporting local confidence is a key
asset.
Page 16 of 74

Page 17

3. Measures of success 
Next Steps – from back to basics to getting it right for everyone 
3.1 Operating Model: We are currently engaging with stakeholders across North
Lanarkshire through 12 discussion sessions to help refine the content of an operating
model. The operating model will protect the focus on people but will guide and support
new and existing staff with the articulation of what that means locally.
3.2 Performance and achievement measures: articulating the operating model,
promoting consistency and really clarifying what we want to achieve as a whole system,
facilitates a revision to the performance framework to build the data analysis into the
process on a day-to-day basis. 
3.3 Specific plans and service developments: as this is a whole system approach, there
is a lot to focus on and much change across services, supports and responses that are
needed to achieve and sustain change. There will be future reports providing the more
detailed position across that range. 
3.4 Study Visit: The developments locally have been enriched through learning from
elsewhere in Scotland, the UK and wider. Visits to and engagement with colleagues in
Tayside, Sheffield, Tyneside and Plymouth specifically have enhanced our thinking.  As
part of active network focusing on the Human Learning System Approach and
Relational Public Policy, a Study Visit to North Lanarkshire is taking place on the 25
and 26th June 2025, which is an exciting opportunity to offer something back to the
collective learning as well as recognise the achievements locally. Detail is attached at
Appendix 2.   
4. Supporting documentation 
4.1 Appendix 1 Healthcare Improvement Scotland, Recap of 2024: Summary of ‘Back to
Basics’ to date.
4.2 Appendix 2 North Lanarkshire Leading by Learning Study Visit. 
Morag Dendy
Chief Officer (Planning, Performance, and Quality Assurance) 
Page 17 of 74

Page 18

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The content of this report informs the Medium Term Financial Plan for the Health
and Social Care partnership. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Whilst the content of the report does not impact on any specific role at this stage,
the Trade Unions have been involved from the start in understanding the approach
and inputting to the stepped change towards improved outcomes for the public and
our staff. 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☒
Page 18 of 74

Page 19

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☒ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The Health and Social Care partnership communications lead is actively involved in
supporting a revised communications plan recognising the need for clear, effective
and regular communications for the public as well as the directly employed staff as
well as the staff of partners and stakeholders. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
The actions contained in the report mitigate existing risks relating to sustainability
of services and the potential negative impact of the cost of living on existing
contracts. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒
Page 19 of 74

Page 20

If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 20 of 74

Page 21

On behalf of the Healthcare Improvement Scotland team, We would like to thank you for
attending the ‘Back to Basics ‘session celebration on 22 January 2025.
It was a fantastic session, and we are grateful to you all for your input, time and effort in
supporting the event. We found it provided a space to reflect, learn and engage with you
about the work that has taken place across North Lanarkshire over the past year.  The
following provides a summary of the session and the next steps.
Recap of 2024:
Summary of ‘Back to Basics’ to date
When we started working with you in 2024 you had a clear vision for changing the way to
provide services to the people of North Lanarkshire. Including, supporting better
conversations, reducing overprescribing, working in a more integrated way, streamlining
referrals and moving to a more relational approach.  It is our view that you have made
significant and meaningful steps to achieve these aims. As you move into phase two, we hope
that our reflections here and the learning report to be published will support you to continue
to make outstanding progress.
Journey mapping
We reflected with you using a series of Journey Maps which we had developed through
reflective conversations with each locality. These Journey Maps captured the cultural,
process and experiential changes that have been achieved through the ‘Back to Basic’
approach. The discussion using Maggie’s story reflected the commitment to learning and
curiosity which has been a feature of working with North Lanarkshire.
Appendix 1
Page 21 of 74

Page 22

Action: For next steps, we agreed that you would continue to use Journey Maps as a tool for
capturing case studies, key insights and the views of service users – and find ways to
incorporate this information into your ‘Back to Basics’ process.
Data Analysis
We reflected on the change to waiting times for community assessment. We looked at the
data you shared with us and demonstrated a statistically significant reduction in the amount
of people waiting for community assessments in North Lanarkshire. This pattern mirrored the
feedback we had revived from your teams that working in this way felt better for people and
colleagues.
Action: For next steps, we asked you to explore further what this data meant in the context of
the wider health and care system in North Lanarkshire, to ensure the pattern was sustainable
using balancing measures and to understand further the impact of the changes.
Page 22 of 74

Page 23

Your experience
We reflected with you that from our engagement over the past 12 months, we have seen a
clear change in the language used by colleagues at all levels of the organisation. We have
seen and heard multiple anecdotes and case studies (see journey maps) of change in action.
On the day, we asked you a series of questions against your objectives:
Did you feel more confident using learning as an approach?
Did you feel you were more person-centred?
Did you feel you work more in partnership?
Did it feel better working this way?
In every case, you said you had seen improvement.
Action: To support the learning report, we have developed a self-reflection questionnaire
(link: HIS System Change Development Tracker ). Please take the time to complete this; it is
intended to support your learning and capture the changes to practices in 2024.
Next Steps:
Healthcare Improvement Scotland will:
- Publish the ‘Back to Basics’ Learning Report in partnership with North
Lanarkshire.
Healthcare Improvement Scotland and North Lanarkshire will:
- Prepare for hosting the Human Learning Systems Visit in Spring 2025
Page 23 of 74

Page 24

North Lanarkshire will:
- Continue to develop Journey Maps: Trial new ways of using Journey Maps as part of
future ‘Back to Basic’ events.
- Continue to work on Data Analysis: Complete quantitative data submission asks.
- Capture and implement a consistent way of recording enabling hub data based on
learning from each other for Phase 2.
- Review methods of systematically gaining feedback to test within hubs in Phase 2
- Continue to capture your insights: Complete the MS Forms questionnaire.
Useful Links:
- Design Community of Practice | Healthcare Improvement Scotland - Design
Community of Practice
- Strategic Planning in Health and Social Care | HIS Engage
- CEIM: Experience Improvement Model
- What Matters to You?
- Scottish Approach to Change | HIS Engage
Page 24 of 74

Page 25

Hold the Date
North Lanarkshire
Leading by Learning Study Visit
Dates – 25th/26th June
Location – Civic Square, Motherwell, North Lanarkshire, Scotland 
Event Capacity – 40 attendees 
We are pleased to invite you to the third in the series of study visits to locations across
the UK where learning-based approaches are being used to drive change and
improvement across complex systems.
The location this time is North Lanarkshire and the visit will be hosted by University
Health and Social Care North Lanarkshire.  This will be an opportunity to hear both a
local and a national story. 
Local – North Lanarkshire
You will hear how the Health and Social Care system across North Lanarkshire is
changing, as well as the wider public and community sectors:
• H&SC Place Based Enabling Approach – whole person needs and whole
system response
• Podiatry Services – call today and be seen today
• Community Wealth Building – putting wealth back into local communities
• Enterprise Development – by using “sticky person” inward investment is
happening more quickly and easily
• Community Solutions and Community Connectors – building on strong
communities and joining the dots
• Community Hubs – spaces that communities value and respond to What
Matters
• Ethical Commissioning – how services are planned and purchased locally with
a person centre, human rights approach, focusing on outcomes
Appendix 2
Page 25 of 74

Page 26

National - The Scottish Approach to Change
You will also hear how Healthcare Improvement Scotland are using the learning from
North Lanarkshire as we develop the Scottish Approach to Change. This is a pivotal part
of the NHS Renew agenda in Scotland and supports the health and care system to do
change well. It brings together different change methods into a single approach and
translates theory into a practical tool. Importantly, the Scottish Approach to Change
uses simple accessible language. This means everyone can achieve high quality
change. Following this approach to change will help services become:  
• high quality  
• effective  
• safe  
• person-centred 
We will be dedicating time not only to hearing about this range of exciting developments
but importantly to exploring through discussion what each mean on their own, and
critically, how they link together as part of real system and social change at a place and
national level. There is such a wide range of people looking to attend this visit that we
are keen to draw on the collective knowledge and expertise to think about how we can
build on what we have now.    
So, please note and hold the dates in your diary and at this point we are expecting up to
3-4 people from each organisation who have expressed interest in attending. To help us
with planning can you confirm through the person sending you this invite, how many
places you would wish to have. This will help us to make sure as many people as want to
attend, can attend. Please respond by: 18th April 2025        
Page 26 of 74

Page 27

North Lanarkshire Council
Report
Adult Care and Social Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    CR/MD/PH/LH Date 13/05/25 
Revenue & Capital Budget Monitoring Report: Adult Social Care
Period 12: 01/04/2024 to 28/02/2025 
From  Morag Dendy, Chief Officer (Planning, Performance and Quality Assurance)  
E-mail hendryp@northlan.gov.uk Telephone Paula Hendry, Business Finance
Manager, 07471321768 
Executive Summary
This report provides a summary of the revenue financial performance of the Health & Social
Care Partnership (H&SCP) – North Lanarkshire (Adult Social Care & Housing) and the
financial performance of the Social Work capital programme.  
The report incorporates the period 1 April 2024 to 28 February 2025 (Period 12) and
includes projected outturn forecasts for the financial year ended 31 March 2025, with major
outturn variances highlighted and explained per the approved Financial Regulations.   
H&SCP – North Lanarkshire (Adult Social Care & Housing) has a gross revenue
expenditure budget of £274.462m and is currently projecting an underspend of £3.778m. 
This favourable variance is predominantly the result of the non-recurring underspend of
£6.9m on pension costs resulting from the reduced contribution rate to the Strathclyde
Pension Fund coupled with underspends due to vacancies. This is offsetting overspends
within Overtime, Transport Costs and Payments to Other Bodies. This underspend
represents a positive movement of £2.381m since the previous committee report.   The
movement is predominantly the result of anticipated reductions in spend in home support
overtime, Care Homes and ‘Care at Home’ costs.   
The Social Work capital programme has a total budget of £2.171m and is anticipated to
outturn with slippage of £0.171m.
Recommendations
It is recommended that the Adult Care and Social Work Committee:
(1) Acknowledge the revenue financial outturn position,
(2) Acknowledge the capital financial outturn position,
(3) Approve the virement request as detailed in paragraph 2.16 of the report. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 4
Page 27 of 74

Page 28

1. Background 
1.1 The Council approved its General Revenue Fund Budget on 15 February 2024, and
the Integration Joint Board (IJB) approved its Financial Plan on 27 March 2024.  The
approved Gross Expenditure Budget for the H&SCP – NL (Adult Social Care and
Housing) is £274.462m.    
1.2 The Council approved its new 5-year Strategic Capital Investment Programme on 14
March 2024.  Financial Year 2024/25 is the first year of the programme, with £2.200m
approved for Social Work for the current year.  Net reprofiling from 2023/24, results in
a revised budget of £2.171m, as demonstrated by Appendix 4. 
2. Report 
Revenue: Analysis of Significant Variances
2.1 Within Employee costs, the Service currently anticipates an underspend of £6.560m. 
This is in relation to the non-recurring reduction of employer’s superannuation costs,
coupled with slippage in relation to the recruitment of posts across the Service.  Both
of which being partially offset by higher than anticipated costs in relation to home
support staffing costs.
2.2 Property Costs are anticipated to be overspent by £0.351m.  This is predominantly due
to higher than anticipated spend on Care of Gardens and Adaptations, via the HRA
budget, all of which is offset by higher contributions from NLC Housing, shown as
income
2.3 Supplies and Services are anticipated to be underspent by £0.366m.  This is mainly
due to lower than anticipated spend in equipment and adaptations and across ‘other’
supplies.
2.4 Transport and Plant is anticipated to be overspend by £0.362m.  This is mainly due to
higher than anticipated costs in relation to estimated running costs associated with
vehicles for use across the Service.
2.5 Administration costs are anticipated to be underspend by £0.239m.  This is mainly due
to in-year slippage in relation to Carers budgets. 
2.6 Payments to Other Bodies and Transfer Payments are detailed in Appendix 2.  This
expenditure accounts for £167.984m of the annual budget and is forecast to have an
in-year net overspend of £3.165m (1.9%).  This is primarily in relation to anticipated
spend in ‘Care at Home’ and Independent Care Homes. These projections are demand
led and are based on full year costs for both current clients and those anticipated,
therefore projections will alter as the year progresses, updates will be provided in future
reports.  
2.7 The Service anticipates a total over recovery of income of £0.472m.  An over-recovery
of £0.270m relates to Care of Gardens and Adaptations as highlighted in section 2.2,
£0.081m relates to returned private sector housing grants and £0.196m relates to
contributions from NHS Lanarkshire; these are partially offset by an under-recovery of
£0.085m which is mainly as a result of lower than anticipated income from charges
relating to the Integrated Day Services. 
Page 28 of 74

Page 29

Revenue: Savings
2.8 The Financial Plan of the Health & Social Care Partnership was approved by the
Integrated Joint Board in March 2024 which identified an overall cost pressure for
2024/25 of £22.856m of which £11.402m relates to Adult Social Care.
2.9 To address this cost burden the Service has developed a savings delivery plan which
aims to deliver this saving value over two financial years: 2024/25 and 2025/26.  In
order to spread these savings over two years the Service is using the non-recurring
pension underspend and reserves to offset the shortfall in year 1.  
2.10 The plan includes the following areas:
• Reducing current overspends to align with allocated budgets.
• Review of all Registered Social Landlords services in North Lanarkshire keeping
with the approach taken by other local authorities
• Review of all overtime and agency costs
• Review of non-traditional respite, advocacy and community services.
• Review of whole system approach to ensure that when people contact the services
the response is quick and effective, with a focus on helping people to help
themselves first.
• Review of all vacant posts.
2.11 Updates on these savings will be provided in future reports however Members should
note that the current projected underspend should continue to grow as progress
towards the achievement of these savings is made.
Revenue: Earmarked Reserves
2.12 The Integration Joint Board have reserves of £24.804m for specific Adult Social Care
commitments as detailed in Appendix 3.
2.13 It is anticipated that £6.022m of the earmarked reserves will be used during 2024/25.  
2.14 The remaining £18.782m will be carried forward to 2025/26.  Of this, £8.829m has been
assessed by the Service and set aside for specific projects and initiatives as detailed
in Appendix 3. This leaves a balance of £9.952m, specifically for ‘social care demand
risk’, which has been earmarked to offset any budget pressures, including shortfalls in
savings, and any unanticipated increase in demand.  
2.15 All expenditure to be met from reserves are excluded from the outturn position. 
Revenue: Virement Request
2.16 Due to ongoing variances reported during this financial year, a review of both
“equipment and adaptations” and “private sector housing grants” was undertaken
during period 9 and 10.  In order to reflect budgets accurately and against the recurring
spend profile, a budget virement is recommended.  
2.17 The proposed virement requires a recurring budget transfer of £0.200m between
supplies and services and payments to other bodies.  
2.18 The projections included within this monitoring report reflect the spend in the correct
budget areas and assume the application of this virement, therefore approval is being
sought to action this, on a recurring basis, before the end of the financial year. 
Page 29 of 74

Page 30

Capital: Analysis of Significant Variances
2.19 The Integrated Equipment and Adaptation (IEAS) capital programme funds equipment
for individuals and adaptations to properties to allow those individuals to live
independently at home.  The Service currently anticipates an outturn, with minimal
slippage, of £0.171m.  
2.20 Following on from the pandemic, there remain uncertainties in respect of demand and
complexity of need and therefore this budget will continue to be monitored closely, and
any forecast movements will be highlighted in future reports.
2.21 Appendix 5 outlines the Service’s total capital budget, outturn position and current
contractual commitments. 
3. Measures of success 
3.1  The Service operates within approved budget resources. 
4. Supporting documentation 
Appendix 1 Revenue – Subjective Analysis 
Appendix 2 Revenue – Payments to Other Bodies & Transfer Payments Analysis 
Appendix 3 Revenue – Status of Earmarked Reserves  
Appendix 4 Capital – Budget Movements 2024/25 
Appendix 5 Capital – Summary Expenditure by Thematic Category     
Morag Dendy
Chief Officer (Planning, Performance and Quality Assurance) 
Page 30 of 74

Page 31

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The Adult Social Care management team will continue to review and implement
management action and initiatives, with the aim of remaining within approved budget
resources. This action will include vacancy management, curtailment of non-
essential expenditure, and maximising income.  This report has been prepared by
service-based Finance personnel in consultation with budget managers, in
accordance with the Financial Regulations. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
Page 31 of 74

Page 32

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
All activities undertaken by the Council are subject to risk, and in acknowledging the
Council’s approved Risk Management Strategy, Services manage these as part of
their overall corporate and service planning processes. The demands and
restrictions resulting from Covid, and the current economic climate has the potential
to impact upon the Council’s ability to provide quality services within approved
budget levels. 
The Service continues to face increasing demand pressures for provision within the
home support, self-directed support and independent care home arenas. To mitigate
these pressures the Service reviews and considers data and trends in relation to
current and anticipated demand on an ongoing basis to underpin projections of need
and cost, and to agree appropriate operational and management action. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 32 of 74

Page 33

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 33 of 74

Page 34

APPENDIX 1
[1] [2] [3] [5] [6] [7]
EMPLOYEE COSTS 94,042,784 87,482,052 6,560,732 FAV 7.0% 633,601 Anticipated underspend mainly as a result of the non-recurring reduction of employer's
Superannuation costs, coupled with slippage in relation to recruitment across the Service.
Both of which partially offset by higher than anticipated costs in relation to home support
staffing costs
PROPERTY COSTS 3,163,701 3,515,207 (351,506) ADV (11.1%) (75,341) Higher than anticipated spend on Care of Gardens and Adaptations (Housing)
SUPPLIES & SERVICES 6,880,706 6,514,338 366,368 FAV 5.3% (46,718) Underspends in equipment and adaptations and 'other' Supplies areas
TRANSPORT & PLANT 1,782,480 2,144,559 (362,079) ADV (20.3%) 185,688 Projected overspend in relation to Internal Transport charges, partially offset by underspends
in Vehicle Contract Hires
ADMINISTRATION COSTS 579,052 339,951 239,101 FAV 41.3% 33,067 Underspends in general admin across the Service and in-year slippage in relation to Carers
budgets
PAYMENTS TO OTHER BODIES 60,418,196 61,037,754 (619,558) ADV (1.0%) 668,855 Please refer to Appendix 2 for analysis
TRANSFER PAYMENTS 107,566,341 110,112,102 (2,545,761) ADV (2.4%) 773,536 Please refer to Appendix 2 for analysis
CAPITAL FINANCING COSTS 0 0 0 0.0% 0
REVENUE FINANCING COSTS 0 0 0 0.0% 0
OTHER EXPENDITURE 28,858 10,595 18,263 FAV 63.3% 88
TOTAL EXPENDITURE 274,462,118 271,156,559 3,305,559 FAV 1.2% 2,172,776
NLC CONTRIBUTION (208,023,791) (208,023,791) 0 0.0% 0
NLC CONTRIBUTION - HOUSING (2,229,010) (2,499,689) 270,679 FAV (12.1%) 95,679 In relation to higher than anticipated spend on Care of Gardens and Adaptations
INCOME FROM HEALTH (58,579,415) (58,776,077) 196,662 FAV (0.3%) 129,900 In relation to recently received 'Winter Planning' funding, offsetting expenditure incurred
FEES AND CHARGES (1,415,167) (1,330,079) (85,088) ADV 6.0% 33,970 Lower than anticipated income in relation to charges for Integrated Day Services
OTHER LOCAL AUTHORITIES 0 (8,454) 8,454 FAV 0.0% 3,906
BUDGETED USE OF IJB RESERVES (2,706,056) (2,706,056) 0 0.0% 0
OTHER INCOME (1,508,679) (1,590,597) 81,918 FAV (5.4%) (54,621) Overrecovery in relation to returned private sectors housing grants and recharge income from
other Council Services
INCOME (274,462,118) (274,934,743) 472,625 FAV (0.2%) 208,834
NET EXPENDITURE 0 (3,778,184) 3,778,184 FAV 0.0% 2,381,610
[4]
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Subjective Analysis
Period 12 (01 April 2024 - 28 February 2025)
Adult Social Care & Housing - INTEGRATED
CATEGORY ANNUAL BUDGET PROJECTED
OUTTURN
PROJECTED OUTTURN
VARIANCE % MOVEMENT VARIANCE ANALYSIS
Page 34 of 74

Page 35

APPENDIX 2
[1] [2] [3] [5] [6] [7]
Care at Home (SDS Framework 1 & 2) 106,789,258 109,630,874 (2,841,616) ADV (2.7%) 770,936 Demand led activity.
Independent Care Homes 47,092,736 48,998,363 (1,905,627) ADV (4.1%) 182,237 Demand led activity.
Payments to NHS Lanarkshire 2,351,117 2,261,846 89,271 FAV 3.8% 45,648 Position reflects anticipated in year payments
Non Traditional Respite 335,283 96,702 238,581 FAV 71.2% 2,715 Position reflects anticipated Locality demand
Other Local Authorities - General 127,909 125,224 2,685 FAV 2.1% 0 Position reflects anticipated in-year demand
Voluntary Organisations & Payments to Other Bodies - Gen 8,818,070 7,820,658 997,412 FAV 11.3% 530,214 Position reflects anticipated in-year demand
Housing Support (RSL's) 777,083 481,228 295,855 FAV 38.1% 2,600 Position reflects projected contract levels
Locality Flexibility 218,068 171,595 46,473 FAV 21.3% 2,696 Position reflects anticipated Locality demand
Private Sector Housing Grants 1,352,378 1,352,378 0 0.0% 4,193 Position reflects anticipated in-year demand
Medical Fees 122,635 97,946 24,689 FAV 20.1% 6,151 Position reflects Service's approach to absence management
Agency Fees 0 113,043 (113,043) ADV 0.0% (105,000) Position reflects anticipated in-year payments, mainly Mental Health
Officers (funded by Winter Planning funding)
Other 0 0 0 0.0% 0
TOTAL EXPENDITURE 167,984,537 171,149,856 (3,165,319) ADV (1.9%) 1,442,390
[4]
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Payments to Other Bodies & Transfer Payments Analysis
Period 12 (01 April 2024 - 28 February 2025)
Adult Social Care & Housing - INTEGRATED
CATEGORY ANNUAL
BUDGET
PROJECTED
OUTTURN
PROJECTED
OUTTURN VARIANCE % MOVEMENT VARIANCE ANALYSIS
Page 35 of 74

Page 36

APPENDIX 3
Contract Monitoring Staff 87,351 0 87,351 0 87,351
22/23 Saving: Muirpark 27,485 11,867 15,618 0 27,485
Carers Act 2018 - Support 2,595,745 174,226 2,421,519 0 2,595,745
Social Care Demand risk 12,682,932 2,730,368 9,952,564 0 12,682,932
Tech digitial Improvements 389,719 77,829 311,890 0 389,719
Increase Advocacy provider 65,667 46,500 19,167 0 65,667
Discharge to assess/ PDD 109,196 56,597 52,599 0 109,196
Adapations Funding 308,571 178,039 130,532 0 308,571
Tech Improvements - SWIS 700,000 148,420 551,580 0 700,000
Tech Improvements - Comm Alarms 464,604 220,368 244,236 0 464,604
Tech Improvements - Home Scheduling System 3,698,423 371,966 3,326,457 0 3,698,423
Adult Protection Contribution 50,000 39,715 10,285 0 50,000
MH 2 NL10s 161,633 22,259 139,374 0 161,633
Cost of Living Helpline 359,993 217,413 142,580 0 359,993
HS resilience 656,188 91,782 564,406 0 656,188
Staff Training Academy "grow your own" 1,128,466 424,654 703,813 0 1,128,466
Building Capacity Funding Across The Ip Sector (part of Business Case)
The Winter Planning & Enhanced supports Business Case
TOTAL 24,804,931 6,022,638 18,782,293 0 24,804,931
1,318,958 1,210,636 108,322 1,318,958
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Status of Earmarked Reserves
Period 12 (01 April 2024 - 28 February 2025)
Adult Social Care & Housing - INTEGRATED
TOTALDESCRIPTION OF EARMARKED RESOURCE Approved
Reserve Total 2024/25 2025/26 No Longer
Required
0
Page 36 of 74

Page 37

APPENDIX 4
Approved: Year 1 budget (5 year Capital Program 2024/25 to 2028/29) 2,200,000
Reprofiling from 2023/24 (28,677) Included in opening budget Social Work Key Ambition Integrated equipment & adaptations
REVISED CAPTIAL BUDGET 2024/25 2,171,323 0 0 0
Theme
NORTH LANARKSHIRE COUNCIL
Capital Budget Monitoring Report - Budget Movements 2023/24
Period 12 (01 April 2024 - 28 February 2025)
Social Work Capital Programme
BUDGET MOVEMENTS 2024/25 £ Period Division Thematic
Category
Page 37 of 74

Page 38

APPENDIX 5
Social Work:
Integrated Equipment and
Adaptations
2,171,323 1,576,871 1,782,351 217,649 2,000,000 171,323
TOTAL 2,171,323 1,576,871 1,782,351 217,649 2,000,000 171,323
FINAL
OUTTURN
OUTTURN
VARIANCETheme BUDGET ACTUAL COMMITTED
NORTH LANARKSHIRE COUNCIL
Capital Budget Monitoring Report - Summary Expenditure by Thematic Category
Period 12 (01 April 2024 - 28 February 2025)
Social Work Capital Programme
UNCOMMITTED
Page 38 of 74

Page 39

North Lanarkshire Council
Report
Adult Care and Social Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    CR/NS Date 13/05/25 
Health & Social Care Partnership Medium Term Financial Plan
2025/26 – 2027/28 
From  Nicola Scott, Chief Finance Officer - University Health and Social Care North
Lanarkshire  
E-mail scottn@northlan.gov.uk Telephone 07581 007187 
Executive Summary
The Medium-Term Financial Plan (MTFP) 2025/26 – 2027/28 and Long-Term Financial
Outlook (LTFO) 2025/26 – 2034/35 were approved by the Integrated Joint Board (IJB) on
19th March 2025.
The MTFP provides a medium-term view of the challenges and opportunities facing the
partnership over the coming 3 years and the LTFO provides an estimate of the longer-term
position against a background of funding not keeping pace with increasing costs and
demands. 
The MTFP estimates a budget gap of £72.749m over the next three years, with the gap in
2025/26 being £35.624m.  To address this, a number of non-recurring solutions have been
identified which reduce the gap to £14.729m, of which Social Care represents £10.386m. 
To meet the requirement on the Partnership to set a balanced budget, a package of savings
have been identified. 
The LTFO identifies cost pressures in 2028/29 of £40.020m rising to £58.075m in 2034/35.
Recommendations
It is recommended that the Adult Care and Social Work Committee:
(1) Acknowledge the assumptions and context of the Medium-Term Financial Plan as
detailed in Appendix 1.
(2) Acknowledge the savings proposals to meet the savings gap in 2025/26 as outlined in
Section 8 of Appendix 1.
(3) Acknowledge the Long-Term Financial Outlook for 2025-2035 as highlighted in
section 9 of Appendix 1. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 5
Page 39 of 74

Page 40

1. Background
1.1 On the 19th March 2025 the MTFP and LTFO of the University Health & Social Care
Partnership (the Partnership) was approved by the Integrated Joint Board. 
1.2 The MTFP outlines the financial challenges the Partnership faces over the next three
years and provides a framework which will support the Partnership to remain financially
sustainable. The LTFO provided board directors with a longer-term view on the
projected demand profile and the resulting financial pressures from 2025 to 2035.  The
plan highlights that the Partnership is operating in an increasingly challenging
environment with funding not keeping pace with increasing costs and demand.  The full
financial plan is included at Appendix 1.
1.3 The challenges outlined in the plan are supported by the findings published in a recent
bulletin by the Accounts Commission.  Using data from the 2023/24 annual accounts,
the bulletin highlights the precarious financial position IJB’s have found themselves in
over the last number of years and continue to do so.   
2. Report
Financial Outlook
2.1 Looking into 2025/26 and beyond, it is anticipated that the public sector in Scotland will
continue to face a number of challenges in the years ahead.  There is significant
uncertainty over what the scale of this is likely to be and it is therefore important that
the Partnership plans for a range of potential outcomes, ensuring sufficient flexibility to
manage in a sustainable manner over the coming years.
2.2 In addition, it is clear from North Lanarkshire Council and NHS Lanarkshire financial
outlooks, that both partners anticipate they will be subject to significant pressure over
the coming years with a further period of constraint and reduction in core funding.  In
this context, there is a greater risk that future uplifts in funding to the Partnership similar
to that provided in previous years may not be deliverable.
Local & National Context
2.3 Health & Social Care Partnerships operate in a complex, challenging and changing
environment where national issues can have an impact on what and how services are
delivered along with the financial resources, they have available to meet this.  The
MTFP has considered a number of key issues, some of which are out with the
Partnership’s control, and those internal issues which the Partnership has the ability to
influence.  
2.4 These factors are detailed within section 4 of Appendix 1 however there are a number
of statistics which compare the 2022 census data to 2011 which are pertinent to
highlight as they will have a significant impact of demand over the coming years:
• Between 2011 and 2022, the 25 to 44 age group saw a percentage decrease (-
7.3%), in contrast the 75 and over age group saw a percentage increase (+21%).
• Although the population is projected to decrease from 2028 to 2043 by 1.2% there
is a forecast increase of 71.4% in the age group 75 years and over across the
same timescale.
• Individuals who reported themselves as “not in good health” has grown by 24.6%
(+6039)
• Individuals who reported themselves as ‘in fairly good health’ as opposed to ‘good
health’ has grown by 15% (+7036)
Page 40 of 74

Page 41

• Individuals who reported themselves as having ‘long term health conditions’ has
grown by 30.6% (+43,943)
• Individuals self-reporting mental health issues has grown by 158.6% (+24,903)
• Individuals self-reporting as providing informal / unpaid care has grown by 31.6%
(+10,877)
Medium Term Financial Plan 
2.5 The 2024/25 budget is the baseline for the financial plan, this baseline is shown in
section 5 of Appendix 1 and highlights that 60% of the Partnership’s resources come
from NHSL, 26% are from NLC with the remainder from the set aside budget and South
Lanarkshire hosted services.  
2.6 Following the same financial planning principles as the council, a range of risk-based
scenarios, envisaged, pessimistic and optimistic with regards to total pressures was
established.  Based on this, the recommendation to the IJB was to progress a financial
strategy based on the envisaged scenario.  In doing so the funding gap is £72.749m
over the next 3 years, as shown in Table 1.  
2.7 The 2025/26 funding gap is £35.624m, to address this a number of non-recurring
solutions have been identified including one off funding from the Scottish Government,
one off savings on pay and non-pay budgets within Health, the superannuation savings
within Social Care and the use of reserves, resulting in a remaining gap of £14.729m,
of which £10.386m is specific to Social Care Services. 
Table 1  
2025/26    
(£000)
2026/27    
(£000)
2027/28   
(£000)
Total
(£000)
FUNDING GAP 35.624 18.322 18.804 72.749     
Non-recurring solutions identified 20.895 0 0 20.895     
Remaining Gap 14.729 18.322 18.804 51.854
2.8 Further detail on the cost pressures and funding solutions are provided in section 7 of
Appendix 1.
2.9 In order to meet the funding gap and achieve a balanced budget next year, the service
redesign and transformation that has taken place over the last number of years will
need to continue.  Whilst it is becoming increasingly challenging to deliver savings on
a recurring basis the Partnership must focus on the budget available, of over £800m,
and how services can best be delivered and priorities achieved within that financial
envelope rather than focussing on the savings that have to be implemented.
2.10 Section 8 of Appendix 1 outlines the service redesign that is planned across the
Partnership.  With regards to social care this focuses on 3 main areas:
Home Support: focus on redesign of shift patterns and service provision
and further develop the enabling approach.
Independent Care Homes: focus on reducing length of stay and number of
placements. 
Care at Home: review of the guided self-assessment process. 
Page 41 of 74

Page 42

2.11 It is recognised that service redesign and savings plans take time to implement
therefore, to mitigate this risk to the Partnership, contingency reserves may be needed
to fund the gap until the full savings can be realised.  Section 10 of Appendix 1 details
the reserves strategy and highlights that the Partnership is projected to have £30.185m
risk based and contingency reserves as at 31st March 2025.
Long Term Financial Outlook
2.12 The MTFP details the pressures up to 2027/28, however an LTFO was also presented
to the IJB which demonstrates the impact of cost and demand pressures arising from
employee costs, inflationary cost pressures, demographic growth and demand, local
cost pressures and legislative and policy developments up to 2034/35.  
2.13 These pressures are shown in section 9 of Appendix 1 and range from £40.020m in
2028/29 to £58.075m in 2034/35.  While the continuing changing financial environment
means that the reliance that can be placed on these figures decreases the further into
the future the projections go it provides both IJB Directors and Committee Members
with an indication of the challenges to come.
Risks & Uncertainties
2.14 There are risks and uncertainties inherent in any financial planning process therefore
the key risks are outlined in section 11 of Appendix 1.  These will be monitored over
the coming months and assumptions will be updated as necessary. 
3. Measures of success 
3.1  The Service operates within the approved budget during 2025/26 
4. Supporting documentation 
4.1 Appendix 1 - Medium Term Financial Plan 2025/26 – 2027/28, Incorporating the Long
Term Financial Outlook. 
Nicola Scott
Chief Finance Officer University Health & Social Care Partnership 
Page 42 of 74

Page 43

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The financial plan has been developed in conjunction with the Finance Team and all
assumptions and savings proposals have been discussed with them. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
Page 43 of 74

Page 44

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒  
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
The risks are detailed in section 11 of Appendix 1.  These will be regularly reviewed
as part of the Partnerships Risk Monitoring process and will be reported to the
Performance Finance & Audit Committee as well as the quarterly IJB meetings. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 44 of 74

Page 45

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 45 of 74

Page 46

Appendix 1 
Strategic
Commissioning
Plan
FINANCIAL
PLAN
Engage with
Partner Bodies
Support
Transformation
Budget Setting
& Monitoring
Medium Term 
Financial Plan
2025/26 – 2027/28
INCORPORATING THE LONG TERM FINANCIAL OUTLOOK      
Page 46 of 74

Page 47

1 | P a g e
CONTENTS
1. INTRODUCTION 2
2. EXECUTIVE SUMMARY 2
3. PURPOSE 3
4. NATIONAL & LOCAL CONTEXT 4
5. FINANCIAL CONTEXT 6
6. FINANCIAL PLANNING ASSUMPTIONS 7
7. MEDIUM TERM FINANCIAL PLAN 2025/26 -2027/28 8
8. THE RESPONSE 10
9. LONG TERM FINANCIAL OUTLOOK 2025/26 – 2034/35 11
10. RESERVES STRATEGY 12
11. RISKS & UNCERTAINTIES 13
APPENDIX 1 – FINANCIAL PLANNING ASSUMPTIONS 14 
Page 47 of 74

Page 48

2 | P a g e
1. INTRODUCTION
The North Lanarkshire Integration Joint Board (IJB) was established as a corporate body by Scottish
Government and became operational in June 2015 with integrated delivery of health and social care
services commencing on 1 April 2016.  It is a joint venture between NHS Lanarkshire (NHSL) and North
Lanarkshire Council (NLC).  The IJB has responsibility for the strategic planning and commissioning of
a wide range of services within North Lanarkshire.
The North Lanarkshire University Health and Social Care Partnership (the Partnership) is responsible
for the operational delivery of the IJB strategic directions.  This includes the services we are required
to provide, the funding allocated and the monitoring of performance.  The services include:
• Accident and emergency services provided in a hospital
• Inpatient services related to general, respiratory and rehabilitation medicine
• Palliative care services
• Community health services including Lanarkshire wide hosted services
• Social care services.
2. EXECUTIVE SUMMARY
The Medium Term Financial Plan (MTFP) 2025/26 – 2027/28 provides a medium term view of the
challenges and opportunities facing the IJB and considers what the implications of this are for the
finances of the organisation.  A robust MTFP will support the priorities and ambitions as outlined in
the Strategic Commissioning Plan whilst ensuring the organisation remains financially sustainable.
The Partnership is operating in an increasingly challenging environment with funding not keeping
pace with increasing costs and demand, therefore the Long Term Financial Outlook (LTFO) 2025/26
– 2034/35 provides an estimate of the longer term position against this backdrop.    In May 2023 the
Scottish Government published an updated Medium Term Financial Strategy for the period 2023/24
to 2027/28, providing insight into future funding and spending priorities at a national level.  The move
to multi-year settlements however remains an aspiration which means the uncertainty which is
currently impacting on strategic commissioning activity across Partnership will continue.  
Both the MTFP and LTFO provide an overview of the financial planning assumptions in relation to
projected cost pressures arising from demographic growth, legislative and policy developments,
employee costs and inflation alongside potential partner funding contributions in future years.
The MTFP estimates a budget gap of £51.854m over the 3-year planning period 2025/26 to 2027/28,
of which £14.729m relates to 2025/26.  Therefore, to meet the requirement on the Partnership to
set a balanced budget, a package of savings has been identified to meet the 2025/26 gap.  Any in
year shortfalls will be met by reserves, as permitted in the IJB Reserves Strategy.
The LTFO identifies cost pressures in 2028/29 of £40.020m rising to £58.075m in 2034/35, however
due to the uncertainty in funding beyond the 3 year medium term planning period no assumptions
have been made on the likely income receipts to meet these pressures.
The long term financial constraints will require the Partnership and both partners to make difficult
decisions in the years to come.  Therefore, the whole system approach and working collaboratively
with carers, third parties and independent providers is essential.  An effective communication
strategy is also essential to ensure public confidence is maintained. 
Page 48 of 74

Page 49

3 | P a g e
3. PURPOSE
The long-term vision for the Partnership was set out in the original Strategic Plan 2016- 2026 and
continues as the over-arching vision of the Strategic Commissioning Plan 2023-26. This states that
the people of North Lanarkshire will achieve their full potential through: 
In order to implement this vision, the Partnership has 6 key ambitions which were revised in 2023,
following engagement with stakeholders, taking experience gained since 2016 and looking at the
current and future challenges facing the Partnership. 
Longer term planning is integral to the Partnership’s Financial Strategy and strategic approach to
budgeting.  Effective decision making relies on robust financial planning and the MTFP and LTFO assist
in ensuring resources are aligned to the key priorities and ambitions highlighted above. 
With limited resources and increasing pressures on the Partnership’s services it is there is a need to
adapt and change to be more efficient, responsive, and sustainable.  A co-productive approach
therefore needs to be adopted that fully involves communities in decisions ensuring an approach that
supports and empowers them when a different model of service delivery is proposed.
• Living safe, healthy and independent lives in their
communities. 
• Receiving the information, support and care they need,
efficiently and effectively, at the right time, in the right place
and in the right way.
• Ensuring North Lanarkshire is the best place in Scotland to
grow up.  
KEY AMBITIONS
 Do the right thing first time
 Increased focus on prevention, early intervention and
tackling inequalities by working with communities and
people 
 Develop and support a workforce for the future 
  Improve mental health and wellbeing 
  Support people through a whole family approach
Page 49 of 74

Page 50

4 | P a g e
It is therefore essential that service re-design and transformation is delivered in a planned and holistic
manner, rather than reactive cuts to services.  The adoption of a medium to long term approach for
financial planning enables this approach.      
4. NATIONAL & LOCAL CONTEXT
Health & Social Care Partnerships operate in a complex, challenging and changing environment
where national issues can have an impact on what and how services are delivered along with the
financial resources they have available to meet this.  The MTFP has considered a number of key
issues, some of which are out with the Partnership’ control, and those internal issues which the
Partnership has the ability to influence.  Both internal and external influences need to be considered
with key variables modelled to guide the IJB decisions about the future. 
External Influences (out with the Partnership’s control)
• Increase in demand
• Interest rate fluctuations
• Level of funding from partners and Scottish Government
• National pay agreements
• Supply chain issues associated with the wider economy
• Further financial and economic impacts and potential future pandemics
• National Care Service. 
Internal Influences (within the Partnership’s control)
• Community engagement, partnership working and co-production of service delivery models
• Working to clear priorities as set out in the Strategic Commissioning Plan
• Transformational change programmes to improve outcomes
• Effective people planning and wellbeing
• Use of robust performance data to drive improvement
• Use of digital technologies to improve services and reduce cost
• Effective risk management to keep risk levels within tolerance
• Effective financial planning to ensure best value for the resources available 
There are multi-faceted factors that impact on this budget and the demand for health and social care
services across North Lanarkshire which include:
• North Lanarkshire is the 4th largest area in Scotland.  It is also the 5th most populated with a
population of 341,890.
• Between 2011 and 2022, the 25 to 44 age group saw a percentage decrease (-7.3%), in
contrast the 75 and over age group saw a percentage increase (+21%).
• Although the population is projected to decrease from 2028 to 2043 by 1.2% there is a
forecast increase of 71.4% in the age group 75 years and over across the same timescale.
• 20% of North Lanarkshire’s data zones are within the 20% most deprived in Scotland.
Page 50 of 74

Page 51

5 | P a g e
• The number of people income deprived in North Lanarkshire is 50,897, a reduction of 3% from
SIMD 2016 data.
• The unemployment rate is currently 3.3% which is the lowest in period between 2005 and
2024.  However, the 2022 census reports that the amount of people who are long term sick
or disabled has grown by 6%.
• The 2022 census also provides the following comparisons to the 2011 census:
o Individuals who reported themselves as “not in good health” has grown by 24.6%
(+6039)
o Individuals who reported themselves as ‘in fairly good health’ as opposed to ‘good
health’ has grown by 15% (+7036)
o Individuals who reported themselves as having ‘long term health conditions’ has
grown by 30.6% (+43,943)
o Individuals self-reporting mental health issues has grown by 158.6% (+24,903)
o Individuals self-reporting as providing informal / unpaid care has grown by 31.6%
(+10,877)
• There remains significant ongoing pressure in all health and social care systems across
Scotland.  High demand and patient acuity, coupled with increased flu numbers in recent
months has placed even greater demand on the system.  In Lanarkshire, there is a genuine
whole-system focus to the resilience response and there has been a tremendous effort across
the whole system, including third and independent sectors, communities, carers, and public
partners in the continued response to increased pressures and demand.
• Whilst many older people are expected to enjoy better health than their predecessors did at
an equivalent age, they will still have significant health needs, living with potentially multiple
and complex conditions.  The impact of this will be a steadily increasing demand on health
and social care services, including care at home, care homes, increases in demand for
community-based healthcare, equipment and adaptations and an increased demand for GP
services and medication.   
Page 51 of 74

Page 52

6 | P a g e
5. FINANCIAL CONTEXT
The Partnership delivers and commissions a range of health and social care services to the local
population.  This is funded through budgets delegated from both NHSL and NLC.  
The baseline for the MTFP and LTFO is the 2024/25 budgets; the total resources available during this
year has been £810m.   
This includes funding from NHSL of £483.74m and £209.52m from NLC.
Also included is a ‘Large Hospital Service’ (Notional Set Aside) budget totalling £74.54m.  This budget
is in respect of those functions delegated by the Health Board which are carried out in a hospital
within the Health Board area.  The Set Aside resource for delegated services provided in acute
hospitals is determined by apportioning the hospital expenditure to individual patient episodes,
separating out episodes for services delegated to the IJB from those that are not, and assigning these
to the relevant IJB based on postcode.  The IJB is responsible for the strategic planning of these
services but not their operational delivery.
Finally, £42.05m represents a number of delegated services where South Lanarkshire IJB acts as the
lead host on behalf of North Lanarkshire Partnership.  The value consumed by North Lanarkshire
equates to 52% of South Lanarkshire IJB hosted budget. 
North Lanarkshire IJB
2024/25 Resources
NHSL NLC Set Aside South Hosed
Page 52 of 74

Page 53

7 | P a g e
6. FINANCIAL PLANNING ASSUMPTIONS
Financial planning requires assumptions to be made about future demand and cost pressures which
could be faced by the Partnership and our partners.  This MTFP focuses on the likely cost pressures
that the Partnership can reasonably expect over the next three years which has then been extended
to look at the following seven years for the LTFO up to 2034/35.  These assumptions have been
informed by the local and national context within which the Partnership operates.
It is widely expected that the public sector in Scotland will continue to face a very challenging financial
outlook for the foreseeable future.  
The cabinet Secretary for Finance and Local Government announced the Scottish Government’s
budget for 2025-26 in Parliament on 4th December 2024.  The Director of Health & Social Finance
said this budget provides:
“a platform for the health and social care system to focus on reform and innovation. We must work
as a whole system and across organisational boundaries to improve outcomes and deliver the best
possible care within our available resources”
The Draft Local Government Financial Settlement confirmed the position at individual Council level,
for North Lanarkshire this presented a more favourable position than previously assumed in their
MTFP in June 2024.  However, the Accounts Commission, in its Local Government in Scotland
Financial Bulletin 2023/24 published in January 2025, highlighted that ‘despite the Scottish
Government’s budget proposals in December 2024 indicating a further real terms uplift in funding for
2025/26 the financial outlook for Scotland’s councils remains challenging’.
The same can be said for NHSL, the headline increase to baseline funding is 3% however there
remains significant pressures across the system which require to be addressed.  Therefore, whilst the
provision of recurring investment and non-recurring reserves will help, there remains significant
uncertainty over increasing cost pressures and what the scale of the likely reduction in available
funding will be over the term of this plan.
It therefore remains important that the Partnership ensures sufficient flexibility to manage, in a
sustainable manner, the position which emerges over the coming years, with the likely scenario that
a significant level of further recurring savings will be required.  Consequently, the Partnership’s
financial planning arrangements remains subject to active review using a scenario-based approach in
recognition of the significant uncertainty over rising costs and the scale of variability in the potential
funding available to the Partnership in future years.
The key variables which have been considered in preparing the MTFP & LTFO are detailed in Appendix
1. This is not an exhaustive list of variables, however, the assumptions identified are considered to
be the core issues which require to be included in this plan.  Adjusting for these key variables will give
the Partnership a robust approach to ensuring the board remains financially and operationally
sustainable, and in doing so ensures that it meets its statutory obligations, its policy aspirations, and
the needs of local communities. 
Page 53 of 74

Page 54

8 | P a g e
7. MEDIUM TERM FINANCIAL PLAN 2025/26 -2027/28
As outlined in section 5, the 2024/25 budget is the baseline for the MTFP updated with the financial
planning assumptions outlined in Appendix 1.  A range of risk-based scenarios have been considered,
resulting in envisaged, pessimistic and optimistic positions with regards to total pressures as shown
in Table 1.
Table 1: Estimated Cost Pressures
Financial
Year
Total
Pressures
Envisaged
(£000)
Total Pressures
Pessimistic
(£000)
Total
Pressures
Optimistic
(£000)
2025/26 60.803 65.712 57.219
2026/27 36.905 44.096 33.016
2027/28 37.737 46.607 33.063
Total 135.445 156.415 123.297
Based on these projections the Chief Financial Officer (CFO) recommends that the Partnership
progress with a financial planning strategy based on the envisaged scenario, this is shown in Table 2
with the estimated funding envelope available for 2025/26 to 2027/25 and results in a budget gap of
£14.729m for the forthcoming financial year.
Table 2: Estimated Cost Pressures and Funding (Envisaged Scenario)  
2025/26    
(£000)
2026/27    
(£000)
2027/28   
(£000)
Pressures:      
Contractual Pressures 10.922 11.328 12.081
Demand Pressures 11.922 7.182 7.434
Pay Pressures 14.611 8.577 8.834
Local Cost Pressures 10.998 1.283 0.000
Prescribing 12.350 8.535 9.388
Total Pressures 60.803 36.905 37.737        
Recurring Funding:      
Social Care Spend Reductions 4.804 0.000 0.000
NLC & NHSL Contributions 20.375 18.583 18.933        
Non Recurring Funding      
Reduction in Employers Superannuation 6.961 0.000 0.000
Budget Management - Pays & Non Pays 4.982 0.000 0.000
Prescribing Reserve  4.361 0.000 0.000
Additional sustainability funding  4.591 0.000 0.000        
Total Funding 46.074 18.583 18.933        
FUNDING GAP 14.729 18.322 18.804
Page 54 of 74

Page 55

9 | P a g e
Opportunities to redesign services, remove duplication and achieve efficiency savings have been
implemented over the last number of years and in order to achieve a balanced budget and meet the
budget gap in 2025/26 this service transformation will need to continue over the coming 12 months. 
There is no doubt it is becoming increasingly challenging to deliver further savings on a recurring basis
however, the focus should be on the budget available to the Partnership of over £800m and how
services can best be delivered and priorities achieved within that financial envelope rather than
focussing on the savings that have to be implemented.  Table 3 highlights the financial Strategy for
2025/26.
Table 3:  2025/26 Financial Strategy
North Lanarkshire IJB
Financial Plan 2025/26  
£000
Total Pressures - Envisaged Outlook 60.803    
Financial Strategy to address Funding Pressures: £000
Social Care Budget Management -4.804
NLC & NHSL Funding Contributions -20.375
Reduction in Employers Superannuation Contribution -6.961
Budget Management - Pays & Non Pays -4.982
Prescribing Reserve  -4.361
Additional sustainability funding  -4.591
Service Redesign and Transformation -14.729
Total Financial Strategy -60.803
More detail is provided on the proposed service transformation and redesign opportunities in section
8 ‘The Response’. 
Page 55 of 74

Page 56

10 | P a g e
8. THE RESPONSE
The Partnership is operating in an increasingly challenging environment with funding not keeping
pace with increasing costs and demand for services.  This is reflected in the MTFP which has identified
a £51.854m funding gap over the next 3 years. 
In order to remain sustainable in future years, the Partnership will need to make significant changes
to its operating model, by continuing to explore new ways to deliver services that better meet the
needs of the people in the community.  The focus of a whole system approach is to reduce
inequalities, build community capacity and resilience and thereby decrease demand for services in
other parts of the system.
The response to this challenge is to propose service review and redesign which will result in
efficiencies that meet the £14.729m funding gap in 2025/26.
SERVICE REDESIGN & TRANSFORMATION £14.729m   
Health   £4.343m
Budget Management Non-Pays £0.247m  
A review of budget lines including (but not limited to) travel, training and printing
costs.      
Prescribing £4.096m  
A review of prescribing will be undertaken with a 5% savings target being applied.     
Social Care  £10.386m
Home Support  £2.838m 
Home Support re-design which will include the introduction of the dynamic
scheduling tool to support the process of streamlining shift patterns alongside
service provision.  The re-design will further develop the enabling approach as the
operating model.     
Independent Care Homes  £4.710m 
Focus the strategic direction to reduce both the length of stay in care homes and
the number of people being placed.    
Care at Home £2.838m 
A review of the guided self-assessment process to align with a more strategic
assessment and planning practice.     
Page 56 of 74

Page 57

11 | P a g e
9. LONG TERM FINANCIAL OUTLOOK 2025/26 – 2034/35
The table below gives an estimated impact of cost and demand pressures arising from employee
costs, inflationary cost pressures, demographic growth and demand, local cost pressures and
legislative and policy developments for the next ten years.  
Unlike the MTFP, it does not include a financial strategy to address these cost and demand pressures
or any mitigation to reduce the gross cost through budget uplifts; recurring savings plans or funding
from other sources.   Table 4 details the estimated long term pressures.
Table 4:  Estimated Long Term Cost Pressures 
As previously stated, due to the continuing changing financial environment the Partnership is facing,
the reliance which can be placed on the financial estimates decreases the further into the future the
projections relate to.  The CFO will continue to update and refresh the assumptions as new financial
information, including future funding and savings plans becomes available. 
Pressure on Base Budget
(Envisaged Outlook) 2025/26    
(£000)
2026/27    
(£000)
2027/28   
(£000)
2028/29   
(£000)
2029/30 
(£000)
2030/31   
(£000)
2031/32   
(£000)
2032/33   
(£000)
2033/34   
(£000)
2034/35   
(£000)
Contractual Pressures 10.922 11.328 12.081 12.900 13.786 14.746 15.785 16.911 18.133 19.458
Demand Pressures 11.922 7.182 7.434 7.694 7.963 8.242 8.530 8.829 9.138 9.458
Pay Pressures 14.611 8.577 8.834 9.099 9.372 9.654 9.943 10.242 10.549 10.865
Local Cost Pressures 10.998 1.283 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Prescribing 12.350 8.535 9.388 10.327 11.360 12.495 13.745 15.120 16.631 18.295
Total Pressures 60.803 36.905 37.737 40.020 42.481 45.137 48.004 51.101 54.451 58.075
Pressures:
Page 57 of 74

Page 58

12 | P a g e
10. RESERVES STRATEGY
The Partnership has the same legal status as a local authority and is therefore able to hold reserves
under section 106 of the Local Government (Scotland) Act 1973.  A reserves strategy was developed
to provide security against unexpected cost pressures and to aid financial stability.  The use of
reserves must be prudent and controlled and are generally held for the following purposes:
• To create a working balance to help cushion the impact of uneven income flows
• To create a contingency to cushion the impact of unexpected events or emergencies
• To create a means of building up funds, to meet known or predicted liabilities
• To fund non-recurring costs and to help with payment profiles straddling more than one
year
• To enable the implementation of longer-term savings proposals.
The reserves strategy for 2025/26 is being presented to the IJB in March 2025 and summarises the
reserves position as at 31 January 2025 as detailed in Table 5. 
Table 5:  Reserves as at 31 January 2025 
SUMMARY
Balance at              
31 January 2025
£m
Ring-Fenced Reserves 24.529
Earmarked Reserves 19.006
Risk-Based Reserves 17.045
Contingency Reserves 13.140
TOTAL  73.720
It is recognised that service redesign and savings plans take time to implement therefore, to mitigate
this risk to the Partnership, contingency reserves may be needed to fund the gap until the full savings
can be realised.  Updates, tracking savings achieved against target, will be presented to the board
throughout the year as identified savings options are implemented. 
Page 58 of 74

Page 59

13 | P a g e
11. RISKS & UNCERTAINTIES
Given the current political climate and the associated economic uncertainty, it is important to note
that projections made within this MTFP and LTFO may potentially be subject to significant variation. 
The assumptions applied to income and expenditure models are based on the best information
available at the time of writing.  
There are also a number of risks inherent in this MTFP which will require to be monitored over the
coming months.  
Financial Risks & Uncertainties
• Future funding levels from partner organisations and Scottish Government.
• Continued increasing costs and raising inflation including future pay awards.
• Increasing costs of equipment and adaptations
• The outcome of the negotiations for the national care home rate
• The impact of the increase to national insurance contributions for both direct staff and
commissioned services and the potential lack of additional funding to support these
• Impact of rising costs of commissioned services with providers outwith the national
frameworks asking for significantly above inflation increases.
• The level of non-recurring solutions included to meet the 2025/26 cost pressures.
Operational Risks & Uncertainties
• Impact of proposed savings options which could include an increase to delayed discharge
figures and bed delays. 
• The ability to recruit and retain quality staff to continue to deliver services and manage
increasing demand.
• Unexpected shortage of supplies and materials.
• Increasing level of complex care packages materialising that are currently unknown. 
• Volatility of the external care market and the support required in order to provide stability.
• Increased numbers of providers seeking to set up separate companies and exit the National
Care Home Contract which would lead to individual placement and price negotiations.
• Operational impact of the increased contract prices from providers leading to issues with
placement of clients.
• Changing political factors which influence the UK and Scottish Government priorities and
policy initiatives.
The Partnership maintains a strategic risk register and both partners maintain operational risk
registers.  Strategic and operational risks are regularly monitored and updated by the board and
senior management to mitigate against key risks and uncertainties.
Page 59 of 74

Page 60

APPENDIX 1 – Financial Planning Assumptions
Anticipated Scottish
Government Funding
Levels 
The Scottish Government finance settlement for both partners will
significantly influence the funding contribution each partner can
make to the IJB.  The Scottish Government has historically provided
one year funding settlements which has impacted on the ability to
plan over the longer term with certainty.  Single year settlements
have required assumptions in the MTFP & LTFO from year 2 to 10.
For financial year 2025/26 another one-year settlement was
provided in December 2024, however there is still a commitment
from Scottish Government to move to multi-year settlements in
the future.
Assumptions on
Inflation 
Consumer price index (CPI) and retail price index (RPI) inflationary
increases are assumed for a range of contractual commitments
and purchasing of supplies and materials.    The Office for Budget
Responsibility (OBR) published its latest Economic and Fiscal
Outlook alongside the UK Government’s budget, which indicated
that CPI/ RPI inflation is anticipated to remain higher for longer
than previously expected.  The OBR figures have been used
throughout the plan. 
National Care Home
Contract
A significant cost pressure relates to the National Care Home Rate
Contract (NCHR) which is negotiated annually.  The level for this
year is currently unknown, work remains ongoing within the sector
to agree this rate.  The primary factor influencing this has been the
decision in October of the Chancellor to change the Employers
National Insurance Contribution (eNICs) which will have an impact
on the agreed NCHR.
It is prudent to assume, based on past year trends and the on-going
cost of living crisis that this is likely to increase significantly over the
life of this plan therefore a 10% increase has been included.  
Pay Increases  Employee costs represent a large portion of IJB net budgets with
any increase in pay awards impacting directly on current and future
cost pressures.  The Scottish Government has set the Public Sector
Pay Policy (PSPP) at a maximum of 9% over the next 3 years
therefore an estimated 3% has been assumed for staff employed
in NLC in both the MTFP and LTFO.  This increase has also been
assumed for NHSL staff over the lifetime of the plan, in line with
previous years, full funding is expected for pay uplifts to NHSL staff. 
In the event of an uplift greater than that estimate and no
additional government support, the forecasted gap could
potentially change materially. 
Consideration is also given to the challenges of recruiting and
whether pay settlements are keeping pace with industry
standards.  As future pay agreements are confirmed, these
assumptions will be updated in the model.
Page 60 of 74

Page 61

Increase to National
Insurance
Contributions
As part of the UK Government’s Budget on 30 October 2024 it was
announced that there would be changes to employer National
Insurance Contributions (eNICs).  The increase to the pay bill is
estimated at 2.2% for direct staff and early indications on the
increases likely to be seen on commissioned services could range
from 2.2-2.5%.
While it is understood that Public Bodies will receive funding to
support this additional cost pressure, such funding will be
insufficient to meet the overall cost.   For Social Care Services it is
currently estimated that funding to Local Authorities will be c.60%
for direct staff therefore the unfunded element of 40% is included
in the 2025/26 plan.  However, uncertainty over funding for
commissioned services means that this cost has not been included
and will be funded from reserves until more is known.
NHSL have been advised by Scottish Government that funding may
be available to them therefore the assumption in the plan is that
this will be fully funded. The full recurring impact will be included
in future MTFP updates. 
Assumptions on
Increased Demand for
Services Including
Prescribing 
Health and social care services are experiencing increasing demand
due to demographic growth, an ageing population, complexity of
care needs, deprivation, and health issues.  This increase has been
factored into the financial plan over the full 10 year period to
ensure that costs are adjusted in line with forecast demand,
however, close monitoring is required to ensure that demographic
growth is in line with assumptions made.  If investment in this area
is insufficient over a number of years, this could destabilise services
whilst an over-provision of growth would mean the resources
available would not be effectively allocated in line with need and
priority.
The amount and cost of drugs prescribed usually increases year on
year.  The price of drugs is set nationally and influenced by factors
such as supply and demand, currency movements and patents. 
Prescribing activity is a clinical decision made by a qualified health
professional.  At the time of writing, the current prescribing budget
is projected to overspend by year end 2024/25.  Based on this
trend, a volume and price uplift has been included in future
projections to mitigate against deteriorating health within the
population and the continuing uncertainties experienced in supply
and demand due to fluctuating market conditions.
Investment in Local
Priorities Including IT
Improves and
Upgrades 
A range of local priorities are included in the LTFO including digital
and IT technology improvements, investing in home support and
tests of change pilots.  Depending on when the cost commitment
is expected to be incurred and expected duration, the cost
pressures will be recognised in the year it is forecast to materialise.  
Page 61 of 74

Page 62

Legislative and
National Policy
Decisions 
There are a range of legislative and policy developments which
have and are continuing to be implemented across the
partnership.  To date, additional funding has been made available
by the Scottish Government to take these policies forward and it is
assumed that the expenditure will be contained within the funding
available.  Recognising this, no variation in the cost projection is
therefore considered, however, if future funding from Scottish
Government is withheld or withdrawn, the financial forecast could
change. 
Page 62 of 74

Page 63

North Lanarkshire Council
Report
Adult Care and Social Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    JC/PMCA/MS Date 13/05/25 
Charges for Non-Residential Services, Community Alarms, Meals
Provision, Independent Sector Care Homes & Respite Care 
From  Claire Rae, Chief Officer, University Health and Social Care North
Lanarkshire  
E-mail raecla@northlan.gov.uk Telephone 07866 787044 
Executive Summary 
The purpose of this report is to advise Committee of the charging levels to be applied for
non-residential services, community alarms, meals provision, independent sector care
homes and respite care in 2025/26. 
The Council’s charging policy has been updated for 2025/26 to reflect the new rates. 
In line with the Discretionary Fees & Charges Policy report agreed at Policy and Strategy
Committee on 28/09/23 the services discretionary charges will increase by 5%. 
Recommendations
It is recommended that the Adult Care and Social Work Committee recognises: 
(1) The threshold figure for payment of home support charges set at £284 for single
people and £434 for couples. 
(2) The hourly rate for home support of £20.07. 
(3) The daily rate for attending an Integrated Day Service of £11.03. 
(4) The weekly rate for a Community Alarm of £3.75. 
(5) The charge for meals provided in day services of £5.68. 
(6) Implementation of the increase to Independent Sector Care Home fees as
negotiated via COSLA, Scottish Care and the Scottish Government. 
(7) An uplift in charges for residential respite in line with increases in pensions and
allowances; and Free personal care and nursing care will rise from £248.70 to
£254.60 and £111.90 to £114.55. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement
(12) Ensure our residents are able to achieve, maintain, and
recover their independence through appropriate supports at home
and in their communities
Programme of Work Statutory / corporate / service requirement
Item 6
Page 63 of 74

Page 64

1. Background 
1.1 Local Authorities are empowered through the Social Work (Scotland) Act 1968 and the
Housing Scotland Act, 2001 to apply charges for services. In setting its charging levels,
North Lanarkshire Council has followed the national guidance issued by COSLA in
respect of charging. 
1.2    The COSLA guidance operates on the principle that people on the lowest levels of    
income do not pay for the service and that those who do pay contribute according to
their means. This objective is achieved by setting a charge threshold which is up-rated
annually and applying a taper contribution of income above the threshold level (see
2.1). 
1.3 In accordance with COSLA guidance, North Lanarkshire Council maximises the Income
of all service users who are liable to make a contribution towards the cost of the service.
In 2024/25, the Tackling Poverty Team generated benefit income in the region of
£1,062,569 for people receiving a non-residential service. 
1.4 The Council’s charging policy has been updated for 2025/26 to reflect the new rates.
In line with the Discretionary Fees & Charges report agreed at Policy and Strategy
Committee on 28/09/23 the services discretionary charges will increase by 5%.  
2. Report 
2.1 In line with the COSLA recommendations, the charge threshold for 2025/26 will be £284
per week for a single person and £434 for couples (2024/25 £273 and £417). Persons
with income less than those figures will not be required to pay for home support
services. 
2.2 When calculating maximum service users charge, the Council deducts from their
assessable income any costs which the service user is liable for in respect of housing
costs, i.e. rent, mortgage, council tax and water charges. A taper contribution of 50%
of excess income is then applied. For example, a single person with income of £300
per week after deductions would have their charge assessed as follows: 
Income    £300 
Threshold   £284 
Disposable Income  £6 
Client charge = £6 x 50% =  £3 
2.3 The hourly rate for Home Support Services will increase to £20.07. 
2.4  The charge applied for attending an Integrated Day Service will increase to £11.03 per
day. 
2.5  Charges for meals provided in an Integrated Day Service will increase to £5.68 per day. 
2.6 The Community Alarm charge will increase to £3.75 per week however remaining one
of the lowest in Scotland. 
Independent Sector Care Home Fees - Interim 
Page 64 of 74

Page 65

2.7 The Nursing and Residential Care Home interim rates are based on benchmarks for
direct care costs and care home costs in the National Care Home Contract (“NCHC”)
Care Home Cost Model. 
2.8 The rates which will apply to payment for Nursing and Residential Care for 2025/26,
effective from 7th April (commencement of the tax year for pension uprating), are as
undernoted: 
•  Nursing Care Rate per person per week - £1,013.05 (2024/25 £957.57)
•  Residential Care Rate per person per week - £881.98 (2024/25 £825.94) 
2.9 This settlement reflects the challenging environment faced and the desire for all
stakeholders to work in partnership. This recognises the Scottish Government’s policy
of increasing the earnings of direct care staff within commissioned adult social care to
£12.60 per hour in line with the Adult Social Care Pay policy commitment. 
2.10 The Care Home Cost Model benchmarks Domestic and Catering staff to the National
Minimum Wage, which is set by the UK Government and, as of 1 April 2025, this is
£12.21 per hour. 
2.11 This rate currently excludes an increase in pay for nurses and associated differentials.
The offer comes with a commitment to consider the appropriate uplift to nursing care
rate, maintaining associated differentials, within the model once Agenda for Change
(AfC) pay negotiations have been concluded. 
Respite  
2.12 The weekly charge for residential respite (£135.00 in 2024/25) will rise in line with
increases in pensions and allowances to £140.55 for 2025/26. 
Free Personal Care 
2.13 The rates to be applied to free personal care and nursing care for people in residential
homes for 2025/26 will rise in accordance with the Scottish Government directive from
£248.70 to £254.60 for free personal care and £111.90 to £114.55 for nursing care. 
3. Measures of success 
3.1  Through the income maximisation and charging policy, service users have their income
fully maximised through the social security benefit system. 
3.2  This policy ensures that disability benefits etc are claimed and the Council in turn
receive revenue from charges for services.   
4. Supporting documentation 
4.1 N/A 
Claire Rae
Chief Officer, University Health and Social Care North Lanarkshire
Page 65 of 74

Page 66

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Discretionary rates have increased by 5% in line with Discretionary Fees &
Charges Policy agreed at Committee on 28th September 2023. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Page 66 of 74

Page 67

Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 67 of 74

Page 68

Page 68 of 74

Page 69

North Lanarkshire Council
Report
Adult Care and Social Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    JMcK/CPT Date 13/05/25 
Contracts awarded below Committee approval threshold 
From  James McKinstry - Chief Officer (Assets and Procurement)  
E-mail McKinstryJ@northlan.gov.uk  Telephone 07939 281 102 
Executive Summary
In accordance with the Council’s General Contract Standing Orders (“GCSOs”), GCSO
21.10 requires a summary report be presented to members with details of contracts
awarded since last committee, specifically for the spend range: 
• over £50,000 but below £500,000 for supplies or services; and,
• over £500,000 but below £2,000,000 for works. 
Recommendations
It is recommended that the Adult Care and Social Work Committee: 
(1) Acknowledge the contract awards made since last committee reporting cycle.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Item 7
Page 69 of 74

Page 70

1. Background 
1.1 The Local Government (Scotland) Act 1973 section 81 requires local authorities to
“…make standing orders with respect to the making by them or on their behalf of
contracts for the supply of goods or materials or for the execution of works.”. 
1.2 The Council’s General Contract Standing Orders (“GCSOs”) set out the council’s
specific procurement procedures and responsibilities at all spend levels, and include
the reporting requirements of procurement activity, including contracts awards, to
committee for either approval or acknowledgement. 
2. Report 
2.1 In accordance with GCSO 21.10, this report summarises the contract awards since last
committee, specifically for the spend range: 
• over £50,000 but below £500,000 for supplies or services; and,
• over £500,000 but below £2,000,000 for works. 
2.2 If you require further information regards the contract awards reported, please refer to
the lead service area / Chief Officer detailed in the appendix. 
3. Measures of success 
3.1 All requirements contracted contribute to either the council’s programme of work and/or
fulfil a statutory requirement. 
3.2 All contract awards secure best value for the council in accordance with their evaluation
criteria. 
3.3 All necessary diligence has been undertaken in the evaluation and appointment of
contractors. 
3.4 All contract awards are logged in the council’s contract register. 
4. Supporting documentation 
4.1 Appendix 1 – Summary of contracts awarded. 
James McKinstry
Chief Officer (Assets and Procurement) 
5. Impacts 
5.1 Impacts considered as part of the contract award procedures are recorded in the
individual contract award reports held by the lead service area.  
Page 70 of 74

Page 71

Appendix 1 – Summary of Contracts Awarded 
Contract Ref NLC-SLP-24-090
Title Community Alarm Digital Devices
Classification Supplies
Lead Service Area / Chief Officer Diane Fraser, Chief Officer (Adult Health & Social Care)      
Competition Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on 3rd party frameworks
Procurement Route Call-off following Direct Award using Third Party Framework
No. of Framework Contractors 12
Award Criteria Best Value assessment, in accordance with the Framework Information
Comments This has been procured via Direct Award approach, considering the relevant information on
Framework Contractors technical and commercial proposals available through the Scotland Excel
Framework for Technology Enabled Care Goods (0622), Lot 1 - Digital Dispersed Alarm Units.     
Award
Details
Value £494,846
Contract Duration One Off Purchase
Contractor Name Legrand Electric Limited
Contractor Size Large Company
Contractor Location Northumberland, UK
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? No      
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer Scotland
Duty ☐
HR Policy Impact ☐ Data Protection Impact ☒ Environment / Carbon
Impact ☐
Risk Impact ☒ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☒
Communications Impact
☐
Armed Forces Covenant
Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer       
Page 71 of 74

Page 72

Contract Ref NLC-SLP-24-075
Title Provision of a Shared Alarm Receiving Centre (ARC) Technology Solution
Classification Services
Lead Service Area / Chief Officer Diane Fraser, Chief Officer (Adult Health & Social Care)      
Competition Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on 3rd party frameworks
Procurement Route Call-off following Direct Award using Third Party Framework
No. of Framework Contractors 1
Award Criteria Best Value assessment, in accordance with the Framework Information
Comments This has been procured via Direct Award approach, using the Scotland Excel Framework Ref: 04/22 for
Digital ARC. This is a sole Contractor Framework; Scotland Excel leveraged the buying power of its
members base to secure best value for all members.     
Award
Details
Value £412,183.20
Contract Duration Initial period of 4 years, with option to extend by up to 24 months.
Contractor Name Chubb Fire & Security Limited
Contractor Size Large Company
Contractor Location Lancashire
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? No      
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer Scotland
Duty ☐
HR Policy Impact ☐ Data Protection Impact ☒ Environment / Carbon
Impact ☐
Risk Impact ☒ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☒
Communications Impact
☐
Armed Forces Covenant
Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer       
Page 72 of 74

Page 73

Contract Ref NLC-CPT-24-023
Title Advocacy Service Children & Young People
Classification Services - Social & Specific
Lead Service Area / Chief Officer Alison Gordon, Chief Social Work Officer (Education, Families, Justice and Integrated Practice)      
Competition Governance by Value Lower Threshold Regulated Procurement, procured in accordance with The Procurement Reform
(Scotland) Act 2014 AND The Procurement (Scotland) Regulations 2016
Procurement Route Direct Award for a Health or Social Related Service without advertising
No. of Contractors invited 1
Award Criteria Best Value Approach
Comments As permitted by the rules for commissioning health and social related services and within this spend
threshold, the Service Area are able to award directly with consideration of the needs for the service
users and to provide continuity of service. The appointed Contractor already provides this service, and
this contract continues further provision for 12 months while legislative changes are in progress.     
Award
Details
Value £241,000.00
Contract Duration 12 months 
Contractor Name Who Cares? Scotland
Contractor Size Small 
Contractor Location Glasgow 
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? Yes      
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer Scotland
Duty ☒
HR Policy Impact ☐ Data Protection Impact ☒ Environment / Carbon
Impact ☐
Risk Impact ☐ Children’s Rights and
Wellbeing Impact ☒
Financial Impact ☐ Legal Impact ☐ Technology / Digital
Impact ☐
Communications Impact
☐
Armed Forces Covenant
Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer       
Page 73 of 74

Page 74

Page 74 of 74