Page 1

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE         
Planning Committee 
A Meeting of the Planning Committee of North Ayrshire Council will be held in the
Council Chambers, Ground Floor, Cunninghame House, Irvine, KA12 8EE on
Wednesday, 22 March 2023 at 14:00 to consider the undernoted business. 
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with
provision, by prior notification, for remote attendance by Elected
Members in accordance with the provisions of the Local Government
(Scotland) Act 2003.  Where possible, the meeting will be live-streamed
and available to view at https://north-ayrshire.public-
i.tv/core/portal/home.   
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda. 
2 Minutes
The accuracy of the Minutes of the meeting held on 22 February 2023 will
be confirmed and the Minutes signed in accordance with Paragraph 7 (1)
of Schedule 7 of the Local Government (Scotland) Act 1973 (copy
enclosed). 
3 23/00070/PP: Site to Former Coal Terminal, Hunterston, West Kilbride
Proposal for Variation of conditions 9 and 18 of planning permission
N/22/00133/PPPM relating to the construction of a high voltage sub-sea
cable manufacturing facility (copy enclosed). 
4 23/00058/PP: Site to Oldhall ERF 16 - 20 Murdoch Place, Oldhall West
Industrial Estate, Irvine
Proposal to increase flue height at energy recovery facility by an
additional 10m as alternative to permitted scheme under refs.
20/00819/PPM and 19/00539/PPM (copy enclosed).
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
5 23/00120/PP: Site to Oldhall ERF 16 - 20 Murdoch Place, Oldhall West
Industrial Estate, Irvine
Proposal for Variation of Condition 1 of planning permissions
19/00539/PPM and 20/00819/PPM to facilitate temporary 24 hour
working on the slip forming of the approved concrete bunker (copy
enclosed). 
6 23/00097/CON: Site At Benthead Farm, Kilwinning
Proposal for Installation of a solar farm with a generating capacity of up to
63MW and a battery storage system with a capacity of up to 31.1mw and
associated infrastructure (copy enclosed). 
7 Grouping of Trees in the grounds surrounding Moorpark House,
Kilbirnie
Submit report by the Chief Planning Officer regarding the process and
merits of protecting a group of trees located on the grounds of Moorpark
House, Kilbirnie via a Tree Preservation Order (TPO) (copy enclosed). 
8 Notice under Section 145 of the Town and Country Planning
(Scotland) Act 1997: 17 Auldlea Road, Beith
Submit report by the Chief Planning Officer seeking authority to serve a
Notice under Section 145 of the Town and Country Planning (Scotland)
Act 1997 requiring compliance with Condition 1 of planning permission
(ref. 22/00536/PP) (copy enclosed). 
9 Urgent Items
Any other items which the Chair considers to be urgent.
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE  
Webcasting
Please note: this meeting may be filmed/recorded/live-streamed to the
Council's internet site and available to view at https://north-ayrshire.public-
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live-streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.
Generally, the press and public seating areas will not be filmed. However,
by entering the Council Chambers, using the press or public seating area
or (by invitation) participating remotely in this meeting, you are consenting
to being filmed and consenting to the use and storage of those images and
sound recordings and any information pertaining to you contained in them
for webcasting or training purposes and for the purpose of keeping
historical records and making those records available to the public. If you
do not wish to participate in a recording, you should leave the
meeting.  This will constitute your revocation of consent.
If you have any queries regarding this and, in particular, if you believe that
use and/or storage of any particular information would cause, or be likely
to cause, substantial damage or distress to any individual, please contact
dataprotectionofficer@north-ayrshire.gov.uk. 
3

Page 4

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
Planning Committee Sederunt 
Robert Foster (Chair)
Timothy Billings (Vice-Chair)
Scott Davidson
Stewart Ferguson
Cameron Inglis
Amanda Kerr
Davina McTiernan
Jim Montgomerie
Ian Murdoch
Chloe Robertson 
Chair: 
Apologies: 
Attending: 
4

Page 5

Planning Committee
22 February 2023 
At a Meeting of the Planning Committee of North Ayrshire Council at 2.00 p.m.
involving a combination of participation by remote electronic means and physical
attendance within the Council Chambers, Irvine. 
Present (Physical Participation)
Robert Foster, Timothy Billings, Stewart Ferguson, Cameron Inglis and Davina
McTiernan. 
Present (Remote Participation)
Scott Davidson, Jim Montgomerie, Ian Murdoch and Chloé Robertson. 
Also Present (Physical Participation)
Todd Ferguson (Agenda Items 1-4). 
In Attendance
J. Miller, Chief Planning Officer, A. Gemmell, Strategic Planning Manager and
T. Ledingham, Planning Officer (Strategic Planning) (Economic Development
and Regeneration) (Place); R. Lynch, Senior Manager, J. Niven, Solicitor (Legal
Services), D. McCaw, C. Stewart and S. Wilson, Committee Services Officers
(Democratic Services) (Chief Executive’s Service). 
Chair
Councillor Foster in the Chair. 
1. Declarations of Interest 
There were no declarations of interest by Members in terms of Standing Order 11
and Section 5 of the Code of Conduct for Councillors. 
2. Minutes 
The Minutes of the Meeting held on 25 January 2023 were confirmed and signed in
accordance with Paragraph 7 (1) of Schedule 7 of the Local Government (Scotland)
Act 1973. 
3. National Planning Framework 4 (NPF4) 
Submitted report by the Executive Director (Place) on the adoption of Scotland’s
fourth National Planning Framework (NPF4), which now formed part of the local
development plan for North Ayrshire, sitting alongside the adopted Local
Development Plan (LDP2). 
Agenda Item 2
5

Page 6

The Strategic Planning Manager presented information in connection with the
background to implementation of the plan, including spatial principles, regional
priorities and national developments which aimed to contribute to creating places
which were sustainable, liveable and productive.  The Committee was advised that a
Delivery Programme had been prepared setting out the approach for key short and
medium term actions in relation to governance and collaboration, delivery
mechanisms, infrastructure funding and finance, skills resources and performance,
and monitoring and evaluation.  This would be updated within 6 months and
thereafter on an annual basis. 
Members asked questions and were provided with information in relation to:- 
• the designation of Hunterston as a National Development within NPF4 to
support repurposing; 
• any unforeseen issues in connection with implementation of NPF4 in
conjunction with LDP2 where matters may not accord; and
• the fit of Arran and Cumbrae within the Central Region and how this would be
interpreted to sustain communities and pioneer investment in the blue
economy. 
The Chief Planning Officer advised that an Elected Member development session
would take place on 20 March 2023 covering transitional arrangements in connection
with implementation of NPF4 in conjunction with LDP2. 
The Committee agreed to note (i) the adoption of National Planning Framework 4;
and (ii) that the Framework was now part of the development plan for North Ayrshire. 
4. Tree Preservation Order: Grouping of Trees adjacent to Wildcat Lane and
Summerlea Road, West Kilbride 
Submitted report by the Chief Planning Officer regarding confirmation of a Tree
Preservation Order (TPO) for a group of trees located along Wildcat Road and
Summerlea Road, West Kilbride. 
The TPO, created in September 2022 following approval by the Planning Committee,
was subject to a public consultation period in line with relevant legislation.  The
report summarised the representations made and provided recommendations on
further action upon consideration of those recommendations. The report
recommended that the TPO be confirmed unmodified as the grouping of trees
contributed to wider public amenity. 
Councillor Billings, seconded by Councillor Stewart Ferguson, moved confirmation of
the TPO in line with the report recommendation.  There being no amendment, the
motion was declared carried. 
The Committee agreed to confirm a Tree Preservation Order (TPO) under Section
160 of the Town and Country Planning (Scotland) Act 1997 in the interests of
protecting public amenity. 
Councillor Todd Ferguson left the meeting at this point. 
6

Page 7

5. Tree Preservation Order: Grouping of Trees located at Stevenston High
Kirk Manse 
Submitted report by the Chief Planning Officer regarding the process and merits of
protecting a group of trees located on the grounds of Stevenston High Kirk and the
adjacent Manse. 
The report indicated that concerns had been raised by a member of the public in
connection with a lack of protection for trees located within the grounds of Stevenson
High Kirk and the adjoining Manse.  Council Officers conducted a site visit and desk
top analysis to assess the suitability of a TPO and relevant legislation.  Following a
preliminary assessment of the trees, it was considered that the trees added to the
local landscape character and contributed to amenity.  It was also noted that the
trees were mostly located in the grounds of Stevenston High Kirk, a Category B-
Listed Church and cemetery and designated within the Local Development Plan as
Open Space.  Further considerations included the existence of a core path located
east of the Kirk which led to the Town Centre then down to the Coast.  A subsequent
site visit confirmed numerous tree species of note including a Tulip Tree normally
found within botanical gardens. The trees were found to have met the criteria for a
TPO and the report recommended that this be served in the interests of protection of
public amenity and cultural heritage. 
Members of the Committee expressed support for a TPO to preserve the heritage
and character of the particular area of Stevenston. 
Councillor Montgomerie, seconded by Councillor McTiernan, moved to support the
serving of a TPO in line with the report recommendation.  There being no
amendment, the motion was declared carried. 
The Committee agreed to the serving of a Tree Preservation Order (TPO) under
Section 160 of the Town and Country Planning (Scotland) Act 1997. 
6. Notice under Section 127 of the Town and Country Planning (Scotland)
Act 1997: Tennox Farm, Kilbirnie 
Submitted report by the Executive Director (Place) seeking authority to serve a
Notice under Section 127 of the Town and Country Planning (Scotland) Act, 1997
requiring the removal of the unauthorised dwellinghouse, associated outbuildings
and ancillary works at Tennox Farm, Kilbirnie and restoration of the land to its former
condition prior to development. 
The report advised that the Council had received a number of reports in recent years
that land at Tennox Farm near Kilbirnie had been developed with a number of
unauthorised buildings as well as formation of a large yard area.  An Enforcement
Notice under Section 33A of the Act was served on the owner of the land in March
2022.  The Notice included the requirement for the submission of a planning
application in respect of a dwellinghouse and ancillary outbuildings, which was
subsequently refused planning permission during 2022.  A review of the decision
was undertaken by the Local Review Body on 25 January 2023.  The review was
dismissed with the consequence that the development remained unauthorised. 
7

Page 8

Councillor Foster, seconded by Councillor Billings, moved to grant authority for the
service of a Notice under Section 127 of the Town and Country Planning (Scotland)
Act 1997 in line with the report recommendation.  There being no amendment, the
motion was declared carried. 
The Committee agreed to grant authority for the service of a Notice under Section
127 of the Town and Country Planning (Scotland) Act 1997, requiring the removal of
the unauthorised dwellinghouse, associated outbuildings and ancillary works at
Tennox Farm (ref. 22/00331/PP) and the restoration of the land to its former
condition prior to the development taking place. 
The meeting ended at 2.35 p.m. 
8

Page 9

NORTH AYRSHIRE COUNCIL 
22nd March 2023                                                                                                                                                            
Planning Committee 
Locality  North Coast and Cumbraes
Reference 23/00070/PP
Application Registered 2nd February 2023
Decision Due 2nd April 2023
Ward North Coast 
Recommendation  Approved subject to Conditions 
__________________________________________________________________ 
Location  Former Coal Terminal Hunterston West Kilbride
Ayrshire  
Applicant  XLCC Fao Mr David Kelly 
Proposal  Variation of conditions 9 and 18 of planning permission
N/22/00133/PPPM relating to the construction of a
high voltage sub-sea cable manufacturing facility
___________________________________________________________________ 
1. Description 
Planning Permission (ref. 22/00133/PPPM) was granted 29th June 2022 for 'Planning
Permission in Principle for the erection of a high voltage cable manufacturing facility,
including detailed planning permission for the construction of a 185m high extrusion tower
with associated factories, research and testing laboratories, offices with associated stores,
transport, access, parking and landscaping with on-site generation and electrical
infrastructure and cable delivery system.' 
The permission was subject to 21 conditions including Conditions 9 and 18 which are as
follows: 
Condition 9, which relates to the Planning Permission in Principle and states: "That further
application(s) for approval under the terms of Condition 1 shall be accompanied by a
scheme to treat surface water arising from the or otherwise affecting the site, prepared in
accordance with the principles and practices contained in 'The SuDS Manual' (CIRIA report
C7453, published November 2015) and the requirements of The Water Environment
(Controlled Activities) (Scotland) Regulations 2011, and certified by a suitably qualified
person, shall be submitted to North Ayrshire Council, as Planning Authority, for written
approval.
Agenda Item 3
9

Page 10

Any scheme approved shall include details of proposed ground levels, finished floor levels,
and pre & post development overland flows that shall demonstrate that people and property
would not be put at flood risk during the designed storm event (1 in 200 return period plus an
allowance for climate change and urban creep) when the capacity of the proposed
infrastructure is exceeded. In accordance with the recommendations of the submitted FRA,
finished floor levels shall be set a minimum of 6m AOD, threshold levels shall be raised a
minimum of 150mm above external ground levels, and all key external infrastructure shall
be elevated by at least 150mm or protected by bunds." 
Condition 18 which relates to detailed planning permission for the construction of the 185m
high extrusion tower, and states: "The prior to the commencement of the development of the
tower, that a scheme to treat surface water arising from the or otherwise affecting the site of
the tower, prepared in accordance with the principles and practices contained in 'The SuDS
Manual' (CIRIA report C7453, published November 2015) and the requirements of The
Water Environment (Controlled Activities) (Scotland) Regulations 2011, and certified by a
suitably qualified person, shall be submitted to North Ayrshire Council, as Planning
Authority, for written approval. Thereafter, the certified scheme shall be implemented prior
to the completion ofthe development of the tower and maintained thereafter to the
satisfaction of North Ayrshire Council, as Planning Authority. 
Any scheme approved shall include details of proposed ground levels, finished floor levels,
and pre & post development overland flows that shall demonstrate that people and property
would not be put at flood risk during the designed storm event (1 in 200 return period plus an
allowance for climate change and urban creep) when the capacity of the proposed
infrastructure is exceeded. In accordance with the recommendations of the submitted FRA,
finished floor levels shall be set a minimum of 6m AOD, threshold levels shall be raised a
minimum of 150mm above external ground levels, and all key external infrastructure shall
be elevated by at least 150mm or protected by bunds." 
This application seeks to the delete the final sentence from both conditions - "In accordance
with the recommendations of the submitted FRA, finished floor levels shall be set a
minimum of 6m AOD, threshold levels shall be raised a minimum of 150mm above external
ground levels, and all key external infrastructure shall be elevated by at least 150mm or
protected by bunds." This would remove reference to a finished floor level (FFL). The
applicant considers that FFLs do not need to be 6m AOD and consider they could be
between 4.7m AOD and 6m AOD. 
In support of the application an addendum to the previously submitted Flood Risk
Assessment (FRA) has been provided. 
The site is some 51ha in area, including existing access roads and jetty. The site is a former
coal yard, which has been vacant since 2016. The development would make use of an
existing access and the existing jetty and port. The site is identified in the Local
Development Plan (LDP) as part of the Hunterston Strategic Development Area and
suitable for business and industrial development. The Southannan Sands Site of Special
Scientific Interest ("the SSSI") is some 85m to the west. The Hunterston House Tree
Preservation Order ("the TPO") runs along the eastern boundary of the site. 
The relevant policy of the Local Development Plan adopted November 2019 (LDP) is
considered to be Policy 23: Flood Risk Management. 
10

Page 11

National Planning Policy 4 (NPF4) was adopted 13th February 2023. NPF4 identifies
Hunterston as a Strategic Asset. NPF4 is considered to be a material consideration for this
application. The relevant policy is considered to be Policy 22. 
Other planning applications have been submitted to provide details required by other
conditions (ref: 22/00712/MSCM) and to vary Conditions 11 and 12 (ref: 23/00131/PP). 
2. Consultations and Representations 
The application was subject to statutory neighbour notification procedures including an
advert in the local press. No representations have been received. 
SEPA - No comment. 
Response: Noted. 
NAC Flooding - No objections. The 6m AOD FFL level had been recommended by the
originally submitted FRA. Specific justification including appropriate flood risk mitigation will
still be required in order to discharge the condition. 
Response: Noted. 
Fairlie Community Council - will seek independent advice from a hydrologist. However, no
further comments were received. 
Response: Noted. 
3. Analysis 
Policy 23 of the LDP stated that support will be given to development which is in accordance
with relevant flood risk strategies. Development should avoid locations of flood risk and
should not lead to a significant risk of flooding elsewhere. 
Policy 22 of NPF4 states that development at risk of flooding or in a flood risk area will only
be supported in certain circumstances.
The site is not at risk from fluvial or coastal flooding. SEPA offer no comments but noted in
the original application that the development would be limited to land not likely to flood. NAC
Flooding has no objection. The specific details of any surface water mitigation would still be
required to be submitted and approved under the amended conditions. 
The applicant's submission that the FFL has been considered in more detail following the
grant of planning permission 22/00133/PPPM is noted, as are SEPA and NAC Flooding
comments. The applicant would still have to provide sufficient details to demonstrate that
surface water would be appropriately dealt with. The removal of the reference to 6m AOD
would allow the applicant more flexibility to develop an appropriate drainage schemer but
would not diminish the Council's ability, as Planning Authority, to assess and
approve/refuse any such details as may be submitted. The proposal would remain in
accordance with Policy 23 of the LDP and Policy 22 of NPF4. 
11

Page 12

It is therefore recommended that planning permission be granted with the original 21
conditions but with Conditions 9 and 18 amended as follows. 
Condition 9, which relates to the Planning Permission in Principle would now state: "That
further application(s) for approval under the terms of Condition 1 shall be accompanied by a
scheme to treat surface water arising from the or otherwise affecting the site, prepared in
accordance with the principles and practices contained in 'The SuDS Manual' (CIRIA report
C7453, published November 2015) and the requirements of The Water Environment
(Controlled Activities) (Scotland) Regulations 2011, and certified by a suitably qualified
person, shall be submitted to North Ayrshire Council, as Planning Authority, for written
approval. 
Any scheme approved shall include details of proposed ground levels, finished floor levels,
and pre & post development overland flows that shall demonstrate that people and property
would not be put at flood risk during the designed storm event (1 in 200 return period plus an
allowance for climate change and urban creep) when the capacity of the proposed
infrastructure is exceeded." 
Condition 18 which relates to detailed planning permission for the construction of the 185m
high extrusion tower, would now state: “The prior to the commencement of the development
of the tower, that a scheme to treat surface water arising from the or otherwise affecting the
site of the tower, prepared in accordance with the principles and practices contained in 'The
SuDS Manual' (CIRIA report C7453, published November 2015) and the requirements of
The Water Environment (Controlled Activities) (Scotland) Regulations 2011, and certified by
a suitably qualified person, shall be submitted to North Ayrshire Council, as Planning
Authority, for written approval. Thereafter, the certified scheme shall be implemented prior
to the completion of the development of the tower and maintained thereafter to the
satisfaction of North Ayrshire Council, as Planning Authority. 
Any scheme approved shall include details of proposed ground levels, finished floor levels,
and pre & post development overland flows that shall demonstrate that people and property
would not be put at flood risk during the designed storm event (1 in 200 return period plus an
allowance for climate change and urban creep) when the capacity of the proposed
infrastructure is exceeded." 
4. Full Recommendation 
Approved subject to Conditions 
Reasons for Decision 
Condition 
1. That the permission is for a high voltage cable manufacturing facility with associated
factories, research and testing laboratories, offices with associated stores, transport,
access, parking and landscaping with on-site generation and electrical infrastructure and
cable delivery system only and planning permission would be required for any other use
within Class 5 of the Town and Country Planning (General Permitted Development)
(Scotland) Order, as amended. 
Reason
12

Page 13

In recognition of the special justification for the tower and to retain control over the
site and re-assess the need for the tower in the event of a different operation. 
Condition 
2.  That the approval of North Ayrshire Council, as Planning Authority, with regard to the
siting, design and external appearance of all building and external plant or machinery,
including landscaping, means of access, internal roads, external lighting, sustainable travel
plan and low and zero carbon technology, shall be obtained before the development
permitted in principle is commenced. 
Reason 
In order that these matters can be considered in detail. 
Condition 
3. That further application(s) for approval under the terms of Condition 1 shall be
accompanied by an assessment of on-site heat recovery and re-use, or a heat network
infrastructure plan, or demonstrable evidence that such schemes have been explored but
are not feasible for technical or economic reasons. 
Reason 
In order that the future proofing of the site for heat networks is properly considered as
required by Policy 31 of the LDP. 
Condition 
4. That further application(s) for approval under the terms of Condition 1 shall be
accompanied by a Construction Management Plan and Code of Practice, including details
for monitoring and action against non-compliance. For the avoidance of doubt this shall
include an assessment of use of the rail and port connections as a first principle and the
prohibition of the use of the A78 through Fairlie, the B780/B781, the C26 and all local
non-classified roads by construction vehicles and details of management of impact on the
core path and cycle rout network. 
Reason 
To ensure proper management of the construction process, including impact on the
road network. 
Condition 
5. That further application(s) for approval under the terms of Condition 1 shall be
accompanied by details of an appointed Ecological Clerk of Works (ECoW). The details
shall include contact details, the scope and responsibilities of the ECoW as well as
confirmation of their power to halt or otherwise stop works which are not in accordance with
the mitigation measures identified in the EIA or others, as may be approved. 
Reason 
To ensure appropriate oversight of the construction of the development 
Condition 
6. Prior to development commencing the applicant shall implement the measures
detailed under Mitigation Measures Adopted as Part of the Project in Chapter 9
Hydrogeology, Geology and Ground Conditions of the submitted EIA report dated February
13

Page 14

2022.  All documentation be verified by a suitably qualified Environmental Consultant and
submitted to the satisfaction of North Ayrshire Council, as Planning Authority. 
Reason 
To ensure proper consideration is given to ground conditions and ground water. 
Condition 
7. That further application(s) for approval under the terms of Condition 1 shall be
accompanied by a Dust Management Plan. This shall include the measures detailed under
Mitigation Measures Adopted as Part of the Project in Chapter 13 Air Quality of the
submitted EIA report dated February 2022.  All documentation be verified by a suitably
qualified Environmental Consultant and submitted to the satisfaction of North Ayrshire
Council as Planning Authority. 
Reason 
To ensure proper management of dust throughout the construction period. 
Condition 
8. That further application(s) for approval under the terms of Condition 1 shall be
accompanied by an assessment of the details in terms of the rated noise level, as defined in
`BS4142:2014+A1:2019, from the operation of the facility. The assessment must
demonstrate that the noise from the operation of the facility will not exceed the background
noise level at the curtilage of any existing or consented noise sensitive property at the time
of application and include details of a monitoring scheme for the first 12months of operation
of the facility. 
Reason 
To ensure proper consideration of potential noise from the development. 
Condition 
9. That further application(s) for approval under the terms of Condition 1 shall be
accompanied by a scheme to treat surface water arising from the or otherwise affecting the
site, prepared in accordance with the principles and practices contained in 'The SuDS
Manual' (CIRIA report C7453, published November 2015) and the requirements of The
Water Environment (Controlled Activities) (Scotland) Regulations 2011, and certified by a
suitably qualified person, shall be submitted to North Ayrshire Council, as Planning
Authority, for written approval.  
Any scheme approved shall include details of proposed ground levels, finished floor levels,
and pre & post development overland flows that shall demonstrate that people and property
would not be put at flood risk during the designed storm event (1 in 200 return period plus an
allowance for climate change and urban creep) when the capacity of the proposed
infrastructure is exceeded. 
Reason 
To ensure proper consideration of surface water drainage. 
Condition
10. That further application(s) for approval under the terms of Condition 1 shall be
accompanied by a habitat survey dated not more than 1 year prior to the date of the
submission of the application.
14

Page 15

Reason 
To ensure habitat and protected species considerations are of an appropriate date. 
Condition
11. Prior to commencement of the development of the tower, details of a financial bond
to be secured with the landowner for the removal of the tower in the event of redundancy
shall be submitted to North Ayrshire Council, as Planning Authority, for written approval.
Any such bond shall be retained through the life of the development with confirmation to be
provided to North Ayrshire Council, as Planning Authority, on a yearly basis following
completion of the tower. 
Reason 
To ensure steps are in place to remove the tower should the site become redundant,
in the interest of visual amenity, and in recognition of the landowner being ultimately
responsible for compliance with any conditions. 
Condition
12. Should the tower become redundant, it shall be removed within 6 months of
redundancy. For the avoidance of doubt, redundancy means the factory not becoming
operational within 3 years of construction of the tower or the factory ceasing to operate for a
period of more than 1 year after first becoming operational. 
Reason 
To ensure the timely removal of the tower should the site become redundant, in the
interest of visual amenity. 
Condition
13. The prior to commencement of the development of the tower, details of the external
finish shall be submitted to North Ayrshire Council, as Planning Authority, for written
approval. The development will thereafter be undertaken in accordance with any details as
may be approved and the tower maintained with those details unless otherwise agreed in
writing with the Planning Authority. 
Reason 
To ensure an appropriate external finish for the tower in the interest of visual amenity. 
Condition
14. The prior to the commencement of the development of the tower, a Dust
Management Plan for the control of dust from the construction of the tower shall be
submitted to North Ayrshire Council, as Planning Authority, for written approval. Thereafter
the development shall be undertaken in accordance with any Plan as may be approved. 
Reason 
To ensure proper management of dust throughout the construction period. 
Condition
15. That prior to the commencement of the development of the tower, a Construction
Management Plan and Code of Practice, including details for monitoring and action against
non-compliance shall be submitted to North Ayrshire Council, as Planning Authority, for
approval. Thereafter the construction shall be carried out only as approved by the Plan and
15

Page 16

Code of Practice. For the avoidance of doubt this shall include an assessment of use of the
rail and port connections as a first principle and the prohibition of the use of the A78 through
Fairlie, the B780/B781, the C26 and all local non-classified roads by construction vehicles
and details of management of impact on the core path and cycle rout network. 
Reason 
To ensure proper management of the construction process, including impact on the
road network 
Condition
16. That prior to the commencement of the development of the tower, details of an
appointed Ecological Clerk of Works (ECoW) shall be submitted to North Ayrshire Council,
as Planning Authority, for approval. The details shall include contact details, the scope and
responsibilities of the ECoW as well as confirmation of their power to halt or otherwise stop
works which are not in accordance with the mitigation measures identified in the EIA or
others, as may be approved. The development will thereafter be undertaken only with the
oversight of the appointed ECoW. 
Reason 
To ensure proper oversight of the construction of the tower. 
Condition
17. The rated noise level, as defined in `BS4142:2014+A1:2019, from the operation of
the tower must not exceed the background noise level at the curtilage of any existing or
consented noise sensitive property at the time of application. 
Reason 
To ensure the operation of the tower does not cause undue noise disturbance or
sterilise the wider area for further development. 
Condition
18. The prior to the commencement of the development of the tower, that a scheme to
treat surface water arising from the or otherwise affecting the site of the tower, prepared in
accordance with the principles and practices contained in 'The SuDS Manual' (CIRIA report
C7453, published November 2015) and the requirements of The Water Environment
(Controlled Activities) (Scotland) Regulations 2011, and certified by a suitably qualified
person, shall be submitted to North Ayrshire Council, as Planning Authority, for written
approval. Thereafter, the certified scheme shall be implemented prior to the completion of
the development of the tower and maintained thereafter to the satisfaction of North Ayrshire
Council, as Planning Authority. 
Any scheme approved shall include details of proposed ground levels, finished floor levels,
and pre & post development overland flows that shall demonstrate that people and property
would not be put at flood risk during the designed storm event (1 in 200 return period plus an
allowance for climate change and urban creep) when the capacity of the proposed
infrastructure is exceeded. 
Reason 
To ensure the proper treatment of surface water. 
16

Page 17

Condition
19. Prior to the commencement of the tower, confirmation that the basement proposals
are sufficiently flood resilient/resistant, including an accompanying certified flood
management plan suitably addresses residual flood risk at the site from all sources of
flooding, certified by a suitable qualified person, shall be submitted in writing for the written
approval of North Ayrshire Council, as Planning Authority. 
Reason 
To ensure the risk of flooding to basement level proposal is suitable addressed. 
Condition
20. In the event that the works to commence the tower are not undertaken within 1 year
of the date of this permission, an updated habitat survey dated not more than 1 year prior to
the date of commencement shall be submitted to North Ayrshire Council, as Planning
Authority, for written approval prior to the commencement. 
Reason 
To ensure habitat and protected species considerations are of an appropriate date. 
Condition
21. Prior to the commencement of the development, details of omni-directional red
aviation warning lights to be fitted to the tower shall be submitted to North Ayrshire Council,
as Planning Authority, for approval in consultation with Prestwick Airport, Air Traffic Control
and the Ministry of Defence. The lighting will thereafter be fitted and retained thereafter in
accordance with any details as may be approved. 
Reason 
To meet the requirements of the relevant Air Authorities. 
James Miller 
Chief Planning Officer           
For further information please contact Mr Iain Davies on 01294 324320. 
17

Page 18

Appendix 1 – Location Plan           
DO NOT SCALE Reproduced from the Ordnance Survey mapping with the permission of the Controller of Her Majesty’s Stationery Office
© Crown Copyright.  Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. North Ayrshire
Council Licence Number 100023393. 
18

Page 19

NORTH AYRSHIRE COUNCIL 
22nd March 2023                                                                                                                                                            
Planning Committee 
Locality  Irvine
Reference 23/00058/PP
Application Registered 1st February 2023
Decision Due 1st April 2023
Ward Irvine South 
Recommendation  Approved subject to Conditions 
__________________________________________________________________ 
Location  Oldhall ERF 16 - 20 Murdoch Place Oldhall West
Industrial Estate Irvine North Ayrshire
KA11 5DG 
Applicant  Doveryard F.A.O. Mr Scott Brown 
Proposal  Increase of flue height at energy recovery facility by an
additional 10m as alternative to permitted scheme
under refs. 20/00819/PPM and 19/00539/PPM
___________________________________________________________________ 
1. Description 
Planning permission was granted by the Planning Committee during 2020 for the
development of an energy recovery facility (ERF) at Murdoch Place in Oldhall Industrial
Estate, Irvine (ref. 19/00539/PPM and ref. 20/00819/PPM). 
The development is being implemented and is now approaching the second year of a
three-year construction period. The facility would generate heat and power from
non-recyclable waste from domestic and industrial sources, excluding hazardous and
medical wastes. The facility would have the capacity to process up to 180,000 tonnes per
year.  Once operational, the ERF would employ between 30 and 40 people.  The peak
construction workforce would be around 200 people. 
The applicant is working with SEPA to obtain a Pollution Prevention and Control (PPC)
permit to enable the facility to be operated within the appropriate environmental standards.
Once operational, SEPA would be the regulatory body for all pollution control measures at
the site. 
Agenda Item 4
19

Page 20

To this end, SEPA and the applicant have identified the potential for further improvements to
the scheme design in relation to air quality. As part of the incineration process, the exhaust
gases would be treated, with harmful chemical compounds removed before gases are
discharged through the flue stack. In response to SEPA's requirements, the applicant
proposes to increase the flue stack height by 10 metres, taking the height to 70m above
ground level. The applicant advises that the increased height would improve the dispersion
of the exhaust gases into the atmosphere in the interests of air quality in the vicinity of the
site. 
The application site is located at the southern edge of the Oldhall Industrial Estate to the
southeast of Irvine.  Oldhall was established during the 1970s by Irvine Development
Corporation as a purpose-built location for certain types of incoming industry to Irvine New
Town. 
There are a variety of industries nearby, including a large recycling plant (Lowmac), a
precast concrete block making factory (Hillhouse) and the Council's waste pulverisation
plant. Nearby is the large pharmaceutical works of GSK and the UPM paper mill. There are
a variety of other small and medium sized businesses in the surrounding area. 
In terms of the adopted Local Development Plan, the site is allocated for business and
industry. Strategic Policy 2 (Placemaking) is of relevance to the proposed variation of
condition 1. 
Relevant Development Plan Policies 
Strategic Policy 2
Placemaking
Our Placemaking policy will ensure we are meeting LOIP priorities to make North Ayrshire
safer and healthier by ensuring that all development contributes to making quality places.
The policy also safeguards, and where possible enhances environmental quality through
the avoidance of unacceptable adverse environmental or amenity impacts. We expect that
all applications for planning permission meet the six qualities of successful places,
contained in this policy. This is in addition to establishing the principle of development in
accordance with Strategic Policy 1: Spatial Strategy. These detailed criteria are generally
not repeated in the detailed policies section of the LDP. They will apply, as appropriate, to all
developments. 
Six qualities of a successful place 
Distinctive
The proposal draws upon the positive characteristics of the surrounding area including
landscapes, topography, ecology, skylines, spaces and scales, street and building forms,
and materials to create places with a sense of identity. 
Welcoming
The proposal considers the future users of the site and helps people to find their way
around, for example, by accentuating existing landmarks to create or improve views
(including sea views), locating a distinctive work of art in a notable place or making the most
of gateway features to and from the development. It should also ensure that appropriate
signage and lighting is used to improve safety and illuminate attractive buildings.
Safe and Pleasant
20

Page 21

The proposal creates attractive places by providing a sense of security, including by
encouraging activity, considering crime rates, providing a clear distinction between private
and public space, creating active frontages and considering the benefits of natural
surveillance for streets, paths and open spaces.
The proposal creates a pleasant, positive sense of place by promoting visual quality,
encouraging social and economic interaction and activity, and by considering the place
before vehicle movement.
The proposal respects the amenity of existing and future users in terms of noise, privacy,
sunlight/daylight, smells, vibrations, glare, traffic generation, and parking. The proposal
sufficiently investigates and responds to any issues of ground instability. 
Adaptable
The proposal considers future users of the site and ensures that the design is adaptable to
their needs. This includes consideration of future changes of use that may involve a mix of
densities, tenures, and typologies to ensure that future diverse but compatible uses can be
integrated including the provision of versatile multi-functional greenspace. 
Resource Efficient
The proposal maximises the efficient use of resources. This can be achieved by re-using or
sharing existing resources and by minimising their future depletion. This includes
consideration of technological and natural means such as flood drainage systems, heat
networks, solar gain, renewable energy and waste recycling as well as use of green and
blue networks. 
Easy to Move Around and Beyond
The proposal considers the connectedness of the site for people before the movement of
motor vehicles, by prioritising sustainable and active travel choices, such as walking, cycling
and public transport and ensuring layouts reflect likely desire lines, through routes and
future expansions. 
2. Consultations and Representations 
SEPA - No objection. The following commentary has been provided: 
- The application process for determining whether it is appropriate to grant a Part A permit
under the Pollution Prevention Control (PPC) (Scotland) Regulations (2012) for this facility
is ongoing. During the determination the applicant requires to demonstrate that the Best
Available Techniques (BAT) will be deployed to mitigate the environmental impacts
associated with the activities that will take place on site. During the determination process
changes to the plant design may be identified which require further amendment of the
existing planning consent. For clarity, the determination of the PPC application is ongoing,
and the necessary stack height remains under consideration. 
- In its response to the Church Review: 'Stop, Sort, Burn, Bury?' (2022), the Scottish
Government stated that "Scotland does not need additional waste incineration facilities to
treat our unavoidable and unrecyclable municipal waste beyond those for which planning
permission has already been granted, with limited exceptions and mindful that there will be
a short-term capacity gap in 2025".
21

Page 22

- On the basis that this facility has planning permission, that was granted in accordance with
planning and energy policy that was in place in 2020, SEPA has no objection to this
proposal to increase the stack height by 10m to 70m. 
Response: Noted. Whilst national policy on incineration has altered since the development
at Oldhall was granted planning permission in 2020, the main development is already under
construction and the current application seeks only to amend the flue height. The proposed
change has been identified as part of the PPC process to ensure Best Available Techniques
are utilised once the facility is operational. The original planning permissions remain extant
and would be unaffected by the determination of this proposal. Any further changes to the
flue height would require another planning application to be made. 
Glasgow Prestwick Airport - no comments made on this application. In response to the
original applications, GPA advised that, due to the height and position of the flue stack,
there is a requirement for an omni-directional red warning light to be fitted at the top.  GPA
also noted that if the warning light becomes unserviceable it should be reported immediately
to Glasgow Prestwick Airport (GPA), Air Traffic Control (ATC) so that notification can be
advised to pilots through the appropriate channels. 
Response: A condition could be attached in relation to the need for an omni-directional red
warning light on top of the flue stack in the interests of aviation safety, as per the previous
grants of planning permission in 2020.  An informative could also be attached in relation to
any failure of the light to operate, as per the previous grants of planning permission in 2020. 
3. Analysis 
The application relates only to the height of the flue stack. The main issues associated with
the development, granted planning permission in 2020 and now under construction, are
unaffected. 
Strategic Policy 2 of the LDP (Placemaking), would be relevant in that there are two
determining factors in respect of this proposal. One is the pollution control improvements as
required by SEPA for the PPC, the other is the landscape and visual impact of the increased
height. 
In terms of pollution control, SEPA has no objection and advise that the development must
deploy Best Available Techniques to ensure effective mitigation of environmental impacts. 
The approval of the planning application would provide the developer with a better solution
to the original flue height following SEPA's detailed consideration of the PPC application.
SEPA advise the negotiations on the PPC permit are ongoing. 
In terms of landscape and visual impacts, the proposed height increase from 60m to 70m is
not considered to be significant given the established industrial context of the surrounding
area.  To the south of Oldhall is the UPM paper mill at Meadowhead which has a flue stack
in excess of 70m.  Also nearby are the GSK wind turbines, the final two of which are
currently under construction.  All four wind turbines at GSK would be over 100m in height,
and significantly taller than the proposed 70m flue stack at Oldhall ERF. It is therefore
considered that the landscape character of the area would not be adversely affected by the
proposed height increase given the presence of taller towers and flue stacks nearby. 
22

Page 23

The application has also been assessed against the adopted National Planning Framework
4 and it has been determined that the proposal does not raise any significant strategic
planning issues which conflict with the foregoing assessment, notwithstanding the policy
shift in respect of future incinerator developments. As noted above, the permissions granted
in 2020 are extant and the development is being implemented. 
There are no other material considerations.  It is recommended that the proposed 10m
increase to the flue height is permitted, subject to the condition that an omni-directional red
warning light is fitted as per the recommendations of Glasgow Prestwick Airport. 
4. Full Recommendation 
Approved subject to Conditions 
Reasons for Decision 
Condition 
1. That the flue stack shall be fitted within an omni-directional red warning light which
requires to be commissioned immediately upon erection of the stack. The warning light shall
be operated continuously during hours of darkness and permanently retained in working
condition thereafter unless otherwise agreed in writing with North Ayrshire Council as
Planning Authority. 
Reason 
In the interests of aviation safety. 
James Miller 
Chief Planning Officer           
For further information please contact Mr A Hume Planning Officer on 01294 324318. 
23

Page 24

Appendix 1 – Location Plan           
DO NOT SCALE Reproduced from the Ordnance Survey mapping with the permission of the Controller of Her Majesty’s Stationery
Office © Crown Copyright.  Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings.
North Ayrshire Council Licence Number 100023393. 
24

Page 25

NORTH AYRSHIRE COUNCIL 
22nd March 2023                                                                                                                                                            
Planning Committee 
Locality  Irvine
Reference 23/00120/PP
Application Registered 16th February 2023
Decision Due 16th April 2023
Ward Irvine South 
Recommendation  Approved subject to Conditions 
__________________________________________________________________ 
Location  Oldhall ERF 16 - 20 Murdoch Place Oldhall West
Industrial Estate Irvine North Ayrshire
KA11 5DG 
Applicant  Doveryard F.A.O. Mr Scott Brown 
Proposal  Variation of Condition 1 of planning permissions
19/00539/PPM and 20/00819/PPM to facilitate
temporary 24 hour working on the slip forming of the
approved concrete bunker
___________________________________________________________________ 
1. Description 
Planning permission was granted by the Planning Committee during 2020 for the
development of an energy recovery facility (ERF) at Murdoch Place in Oldhall Industrial
Estate, Irvine. The development is being implemented and is now approaching the second
year of a three-year construction period. The facility would generate heat and power from
non-recyclable waste from domestic and industrial sources, excluding hazardous and
medical wastes. The facility will have the capacity to process up to 180,000 tonnes per year. 
Once operational, the ERF would employ between 30 and 40 people.  The peak
construction workforce would be around 200 people. 
The applicant is seeking permission to vary the terms of condition 1 of the planning
permissions (ref. 19/00539/PPM and ref. 20/00819/PPM) to enable 24 hour working to take
place for 'slip forming' works on the concrete bunker at the construction site between the
end of March 2023 and the end of August 2023 (i.e., approximately 5 months). 'Slip forming'
is the process of forming a concrete structure using a reinforced timber frame then pouring
concrete into the 'mould'. Reinforcement bars are added to the concrete whilst it sets. The
Agenda Item 5
25

Page 26

timber shutters are then removed once the concrete hardens. The concrete bunker at the
ERF would be 35 metres in height and would form the main structure of the facility. Later
phases of construction would result in the bunker being enclosed by a steel frame which
would then be clad with metal panels as per the previously approved planning permissions.   
Condition 1 currently states:
"That the development hereby approved shall be implemented in accordance with the
details and recommendations contained in the supporting documentation submitted with the
planning application unless otherwise indicated below, all to the satisfaction of North
Ayrshire Council as Planning Authority." 
The relevant "supporting documentation" in this case is the previously approved Planning
Statement, which sets out the approved routine construction hours. The relevant text reads
as follows: 
"Construction Phase 
3.85 Construction operations would generally take place between the following hours: 
0700 - 1900 Monday to Friday
0700 -1600 Saturday and Sunday
3.86 Notwithstanding this, it may from time to time be necessary to work outside of these
hours; for example, in connection with the continuous pouring of concrete. It is also
envisaged that non-intrusive activities (such as electrical installations, plumbing and similar
activities) would be undertaken outside of these hours in order to minimise overall
construction time. HGV movements associated with such activities would be insignificant.
3.87 Any intrusive work outside of these hours would be with the prior agreement of the
Local Planning Authority, except in the case of any emergency”. 
The Planning Statement recognises that at times it may be necessary to work outside the
principal working hours, particularly in respect of the continuous pouring of concrete. It is the
slip forming of the main structure for which express authorisation is sought in this case.
Arguably this is provided for in the existing text at 3.86, but for the avoidance of doubt, the
applicant is seeking the following variation to condition 1: 
"That the development hereby approved shall be implemented in accordance with the
details and recommendations contained in the supporting documentation submitted with the
planning application unless otherwise indicated below, and in accordance with the details
submitted in the 'Temporary Construction Hours Variation of Condition' document dated
15/02/2023, all to the satisfaction of North Ayrshire Council as Planning Authority." 
The 'Temporary Construction Hours Variation of Condition' document has been submitted
with the application. The document states that the proposed working is for the formation of
the concrete bunker of the approved ERF. It would take place wholly within the approved
development site and would involve working on the semi-automated pouring of the concrete
to form the bunker walls using a technique known as slip forming which also includes a
trailing platform where the concrete finishers would use hand tools to repair any blemishes
in the concrete as its still fresh and easily repaired. 
All other activities would be kept to day shift working, such as fitting the metal reinforcement
bars in 6m sections during the day, allowing sufficient work for the shutter to cover during
the night shift. No steel fixing or additional craneage activities like adjusting the form would
26

Page 27

take place at night - these would continue to be carried out within the normal stated
construction hours. 
The bunker itself is to be slip formed up to a height of 35m, with a total working height of no
more than 38m. The bunker is the largest section of the approved building. The walls would
be formed in 6m height intervals, beginning at ground level and working upwards until
complete. 
The night-time activity would require safety lighting, which primarily would be use of LED
lights on the platforms positioned facing inwards towards the working area of the slip form
walls. Intumescent strip lights on the access stairways would also be provided. The
applicants state that best industry practice for light pollution would be employed at all times. 
The applicant advises that the principal visual effect of the proposed work would be the
introduction of the lighting to facilitate the proposed night-time working. There would be no
significant noise generating plant or traffic used during night-time working. 
The application site is located at the southern edge of the Oldhall Industrial Estate to the
southeast of Irvine. Oldhall was established during the 1970s by Irvine Development
Corporation as a purpose-built location for certain types of incoming industry to Irvine New
Town. 
There are a variety of industries nearby, including a large recycling plant (Lowmac), a
precast concrete block making factory (Hillhouse) and the Council's waste pulverisation
plant. Nearby is the large pharmaceutical works of GSK and the UPM paper mill. There are
a variety of other small and medium sized businesses in the surrounding area. 
In terms of the adopted Local Development Plan, the site is allocated for business and
industry. Strategic Policy 2 (Placemaking) is of relevance to the proposed variation of
condition 1. 
Relevant Development Plan Policies 
Strategic Policy 2
Placemaking
Our Placemaking policy will ensure we are meeting LOIP priorities to make North Ayrshire
safer and healthier by ensuring that all development contributes to making quality places.
The policy also safeguards, and where possible enhances environmental quality through
the avoidance of unacceptable adverse environmental or amenity impacts. We expect that
all applications for planning permission meet the six qualities of successful places,
contained in this policy. This is in addition to establishing the principle of development in
accordance with Strategic Policy 1: Spatial Strategy. These detailed criteria are generally
not repeated in the detailed policies section of the LDP. They will apply, as appropriate, to all
developments. 
Six qualities of a successful place 
Distinctive
27

Page 28

The proposal draws upon the positive characteristics of the surrounding area including
landscapes, topography, ecology, skylines, spaces and scales, street and building forms,
and materials to create places with a sense of identity. 
Welcoming
The proposal considers the future users of the site and helps people to find their way
around, for example, by accentuating existing landmarks to create or improve views
(including sea views), locating a distinctive work of art in a notable place or making the most
of gateway features to and from the development. It should also ensure that appropriate
signage and lighting is used to improve safety and illuminate attractive buildings.
Safe and Pleasant
The proposal creates attractive places by providing a sense of security, including by
encouraging activity, considering crime rates, providing a clear distinction between private
and public space, creating active frontages and considering the benefits of natural
surveillance for streets, paths and open spaces.
The proposal creates a pleasant, positive sense of place by promoting visual quality,
encouraging social and economic interaction and activity, and by considering the place
before vehicle movement.
The proposal respects the amenity of existing and future users in terms of noise, privacy,
sunlight/daylight, smells, vibrations, glare, traffic generation, and parking. The proposal
sufficiently investigates and responds to any issues of ground instability. 
Adaptable
The proposal considers future users of the site and ensures that the design is adaptable to
their needs. This includes consideration of future changes of use that may involve a mix of
densities, tenures, and typologies to ensure that future diverse but compatible uses can be
integrated including the provision of versatile multi-functional greenspace. 
Resource Efficient
The proposal maximises the efficient use of resources. This can be achieved by re-using or
sharing existing resources and by minimising their future depletion. This includes
consideration of technological and natural means such as flood drainage systems, heat
networks, solar gain, renewable energy and waste recycling as well as use of green and
blue networks. 
Easy to Move Around and Beyond
The proposal considers the connectedness of the site for people before the movement of
motor vehicles, by prioritising sustainable and active travel choices, such as walking, cycling
and public transport and ensuring layouts reflect likely desire lines, through routes and
future expansions. 
2. Consultations and Representations 
Neighbour notification was undertaken in accordance with statutory procedures, which
included a notice in a local newspaper.  No representations have been received. No
consultations required to be undertaken. 
28

Page 29

3. Analysis 
The application relates only to the working hours for slip forming works and proposes 24
hour working during the period between the end of March 2023 and the end of August 2023.
Due to the nature of the concrete slip forming works, continuous pouring is required to
ensure the structural integrity of the concrete bunker, as well as reducing the overall
timescale for completion than would be the case otherwise. 
Strategic Policy 2 of the LDP (Placemaking), would be relevant to the application in respect
of amenity impacts arising from 24 hour working on concrete slip forming operations. The
main effect of which would be the illumination required during the hours of darkness. The
period between the end of March and the end of August is associated with shorter nights
and longer daylight hours. As such, the works would not necessarily result in greater
illumination of the site, especially during the period between June and July.  Furthermore,
there are existing industrial installations nearby which are lit 24 hours per day, including at
GSK and the UPM paper mill. Given this locational context within an industrial area, it is
considered that the visual impact of such lighting, which is required for safety reasons,
would neither be unreasonable nor unacceptable in land use planning terms, especially
since the duration of the 24 hour concrete works would be for a relatively short period of
approximately 5 months. Once slip forming works are complete, the remaining construction
operations would revert to the previously approved day time hours, as noted above. 
With respect to noise, the submitted supporting information states that "the noise generating
effects of the proposed working technique are very limited, consisting principally of transport
movements of one or two concrete trucks per hour, the pouring of the concrete, and the slow
movement of the working platform at some 50mm per hour."  As per the day-time traffic
routing for the development, vehicles travelling to/from the site would use the main road
network, avoiding residential areas. Accordingly, given the very limited level of noise and
limited number of vehicle movements, the proposal is considered acceptable in terms of
Strategic Policy 2. 
The application has also been assessed against the adopted National Planning Framework
4 and it has been determined that the proposal does not raise any significant strategic
planning issues which conflict with the foregoing assessment. 
There are no other material considerations. It is recommended that the proposed variation
to condition 1 is granted. 
4. Full Recommendation 
Approved subject to Conditions 
Reasons for Decision 
Condition 
1. That condition 1 of planning permissions 19/00539/PPM and 20/00819/PPM are
hereby amended as follows: 
"That the development hereby approved shall be implemented in accordance with the
details and recommendations contained in the supporting documentation submitted with the
29

Page 30

planning application unless otherwise indicated below, and in accordance with the details
submitted in the 'Temporary Construction Hours Variation of Condition' document dated
15/02/2023, all to the satisfaction of North Ayrshire Council as Planning Authority." 
For the avoidance of doubt, all other conditions attached to the above planning permissions
are unaffected by this decision and shall continue to have effect. 
Reason 
To secure the implementation of the development in accordance with the additional
supporting information. 
James Miller 
Chief Planning Officer           
For further information please contact Mr A Hume Planning Officer on 01294 324318. 
30

Page 31

Appendix 1 – Location Plan           
DO NOT SCALE Reproduced from the Ordnance Survey mapping with the permission of the Controller of Her Majesty’s Stationery
Office © Crown Copyright.  Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings.
North Ayrshire Council Licence Number 100023393. 
31

Page 32

32

Page 33

NORTH AYRSHIRE COUNCIL 
22nd March 2023                                                                                                                                                            
Planning Committee 
Locality  Kilwinning
Reference 23/00097/CON
Application Registered 8th February 2023
Decision Due 
Ward Kilwinning 
Recommendation  Approved subject to Conditions 
__________________________________________________________________ 
Location  Benthead Farm Kilwinning Ayrshire KA13 7RU 
Applicant  Gina Mackenzie Loughrey 
Proposal  Installation of a solar farm with a generating capacity of
up to 63mw and a battery storage system with a
capacity of up to 31.1MW and associated
infrastructure
___________________________________________________________________ 
1. Description 
The Scottish Government's Energy Consents Unit has consulted the Council, as Planning
Authority, on an application under Section 36 of the Electricity Act 1989. 
The application, at Benthead and Dykeneuk Farms, is for a ''solar generating facility with a
capacity of up to 63 MW and battery storage with a capacity of up to 31.1MW on farmland."
The site covers an extensive area of approximately 130 hectares in the rural area 4km to the
northeast of Kilwinning. The area to be covered with solar panels is approximately 69.4
hectares. It is estimated that the solar farm would generate 73GWh of electricity per year. 
Section 36 of the Electricity Act states that consent is required from the Scottish Ministers
for the construction of such facilities with a capacity exceeding 50 megawatts. The Energy
Consent Units, in accordance with The Electricity (Applications for Consent) Regulations
1990, has sought the views of the Council, as Planning Authority on the proposed
development. 
The proposed development includes the following components:
Agenda Item 6
33

Page 34

- A solar farm of up to 63MW capacity. Solar PV panels to be rack mounted and
arranged in linear rows on an east-west alignment, all facing south; 
- Up to 18 no. battery storage container units (providing 31.1MW capacity), associated
transformers and switchgear (approx. 18m x 2.5m x 3.2m), within a compound to be located
on land to the east of an existing woodland area towards the southern end of the site near to
the Benthead Farm access road;
- Vehicular access points from the Lylestone - Barrmill Road to the west and from the
B778 to the southeast;
- Formation of access tracks (these would not be interconnected across the site area);
- 1 no. substation building (approx. 12m x 4m x 3m), to be located within a compound
at the most southerly point of the site, east of a woodland area near to the Benthead Farm
access road;
- 15 no. inverter kiosks (approx. 6m x 2m x 2m); 
- 16 no. transformer kiosks (approx. 6m x 5m x 3m);
- Underground cables connecting substation, switchgear, transformers and inverters;
- Deer fencing to site boundaries with regular openings to provide passage for small
mammals;
- Existing field boundaries are to be retained with improved management of roadside
hedges (for enhanced screening and biodiversity);
- Fields to continue to be used for rough grazing land by sheep, with areas to be
reserved for enhancing the biodiversity of the land to provide comparable habitats in relation
to the neighbouring SSSI/SAC (e.g. peatland restoration on areas which are degraded and
unsuitable for the development);
- seeding with locally sourced wildflowers would take place following completion of all
works involving ground disturbance around the solar panels, excluding areas to be retained
for compounds or tracks), the purpose of which would be to enhance the ecological value of
the land for nature (e.g. pollen producing flowers for attracting insects and birds). 
On reaching the end of its 40-year operational life, the proposed solar development would
be decommissioned, and the site restored to farmland. 
The consultation includes a number of reports, plans and drawings. These include a design
and access statement, flood risk and drainage assessment, farming and land management
plan, pre-application consultation reports, habitat survey reports and a glint and glare
assessment. The submitted documentation notes that most of the site would be naturally
screened from public roads by existing hedgerows and the topography once enhancement
has taken place. Viewpoints from local houses and farms have also been taken into account
during design following two stages of public consultation. The hedgerows and trees
surrounding the site would remain intact.   
The existing land use is agricultural, primarily rough grazing land (for sheep) within the north
fields (Dykeneuk Farm) and improved pasture (for cattle grazing and/or silage) in the fields
towards the south and west (Benthead Farm).  Areas of rough grazing adjoin deep peatland
areas towards the north and central areas of the farmland, where disturbance of deep peat
would be avoided. As noted above, the proposals also provide for peatland restoration
where appropriate. There are some small pockets of woodland on the fringes of the site and
several small woodlands within it, which would be retained. Site topography is generally a
flat plateau, with a wide 'open' landscape character providing long views in all directions. 
The land rises slightly towards the west towards Jameston Moss. There is an existing wind
turbine (Benthead), which is approximately 61m in height to blade tip located towards the
western edge of the site. There are coniferous plantation woodland areas to the west near
34

Page 35

Jameston Moss and also to the north around Lissens Moss. A number of minor
watercourses or field ditches pass through the site. These would be left undisturbed with
road crossing points provided only where necessary for access. 
In terms of the adopted North Ayrshire Local Development Plan (LDP), the site is within the
Countryside. To the northeast of the boundary is Dykeneuk Moss, which is a designated
Site of Special Scientific Interest (SSSI), Special Area of Conservation (SAC) and Local
Nature Conservation Site (LNCS). These designations relate to the peatland habitat of
Dykeneuk Moss. To the southeast is the B778 Lylestone - Auchentiber road. To the west the
land uses include farmland and plantation woodlands.  Within the site are several minor
public roads, including the Lylestone - to Barrmill road which bisects the site from SW to NE;
a minor road running E-W to Benthead Farm and a minor road running from SE to NW
linking the B778 to the Lylestone - to Barrmill road via Darmule. 
In terms of the adopted LDP, the proposal requires to be considered against Strategic Policy
1 (The Countryside Objective), Strategic Policy 2 (Placemaking), Policy 14 (Green & Blue
Infrastructure), Policy 15 (Landscape & Seascape), Policy 16 (Protection of our Designated
Sites); Policy 18 (Forestry, Woodland, Trees and Hedgerows), Policy 23 (Flood Risk
Management) and Policy 29 (Energy Infrastructure Development). National Planning
Framework 4 (NPF 4) is also of relevance given its status as part of the statutory
development plan.   
The proposed development was screened for EIA purposes during early 2022 (ref.
22/00050/EIA). The conclusion reached was that EIA was not required. 
Relevant Planning History 
None. 
Relevant Development Plan Policies 
SP1 - The Countryside Objective
The Countryside Objective 
We recognise that our countryside areas play an important role in providing homes,
employment and leisure opportunities for our rural communities. We need to protect our
valuable environmental assets in the countryside while promoting sustainable development
which can result in positive social and economic outcomes.
We want to encourage opportunities for our existing rural communities and businesses to
grow, particularly on Arran and Cumbrae, and to support these areas so that they flourish. 
We also recognise that, in general, countryside areas are less well suited to unplanned
residential and other developments because of their lack of access to services, employment
and established communities. We will seek to protect our prime and locally important
agricultural land from development except where proposals align with this spatial strategy.
In principle, we will support proposals outwith our identified towns and villages for: 
a) expansions to existing rural businesses and uses such as expansions to the brewery
and distillery based enterprises in the area.
35

Page 36

b) ancillary development for existing rural businesses and uses, including housing for
workers engaged in agriculture or forestry.
c) developments with a demonstrable specific locational need including developments
for renewable energy production i.e., wind turbines, hydroelectric schemes and solar farms.
d) tourism and leisure uses, where they would promote economic activity,
diversification and sustainable development, particularly where they develop our coastal
tourism offer/ infrastructure.
e) developments which result in the reuse or rehabilitation of derelict land or buildings
(as recognised by the Vacant and Derelict Land Survey) for uses which contribute to the
Green and Blue Network such as habitat creation, new forestry, paths and cycle networks.
f) sensitive infilling of gap sites consolidating existing developments where it would
define/provide a defensible boundary for further expansion.
g) small-scale expansion of settlements on Arran and Cumbrae for community led
proposals for housing for people employed on the island, where a delivery plan is included,
and infrastructure capacity is sufficient or can be addressed by the development and where
the proposal meets an identified deficiency in the housing stock and is required at that
location. All proposals will be expected to demonstrate the identified housing need cannot
be met from the existing housing land supply.
h) new housing in the countryside where it is a replacement or converted building or it is
a house of exceptional design quality.
i) sympathetic additions to existing well-defined nucleated groups of four or more
houses (including conversions) in close proximity
to one another and visually identifiable as a group with some common feature e.g. shared
access. Additions will be limited to 50% of dwellings existing in that group as of January
2005 up to a maximum of four new housing units (rounded down where applicable). 
Strategic Policy 2
Placemaking
Our Placemaking policy will ensure we are meeting LOIP priorities to make North Ayrshire
safer and healthier by ensuring that all development contributes to making quality places.
The policy also safeguards, and where possible enhances environmental quality through
the avoidance of unacceptable adverse environmental or amenity impacts. We expect that
all applications for planning permission meet the six qualities of successful places,
contained in this policy. This is in addition to establishing the principle of development in
accordance with Strategic Policy 1: Spatial Strategy. These detailed criteria are generally
not repeated in the detailed policies section of the LDP. They will apply, as appropriate, to all
developments. 
Six qualities of a successful place 
Distinctive
The proposal draws upon the positive characteristics of the surrounding area including
landscapes, topography, ecology, skylines, spaces and scales, street and building forms,
and materials to create places with a sense of identity. 
Welcoming
The proposal considers the future users of the site and helps people to find their way
around, for example, by accentuating existing landmarks to create or improve views
(including sea views), locating a distinctive work of art in a notable place or making the most
of gateway features to and from the development. It should also ensure that appropriate
signage and lighting is used to improve safety and illuminate attractive buildings.
36

Page 37

Safe and Pleasant
The proposal creates attractive places by providing a sense of security, including by
encouraging activity, considering crime rates, providing a clear distinction between private
and public space, creating active frontages and considering the benefits of natural
surveillance for streets, paths and open spaces.
The proposal creates a pleasant, positive sense of place by promoting visual quality,
encouraging social and economic interaction and activity, and by considering the place
before vehicle movement.
The proposal respects the amenity of existing and future users in terms of noise, privacy,
sunlight/daylight, smells, vibrations, glare, traffic generation, and parking. The proposal
sufficiently investigates and responds to any issues of ground instability. 
Adaptable
The proposal considers future users of the site and ensures that the design is adaptable to
their needs. This includes consideration of future changes of use that may involve a mix of
densities, tenures, and typologies to ensure that future diverse but compatible uses can be
integrated including the provision of versatile multi-functional greenspace. 
Resource Efficient
The proposal maximises the efficient use of resources. This can be achieved by re-using or
sharing existing resources and by minimising their future depletion. This includes
consideration of technological and natural means such as flood drainage systems, heat
networks, solar gain, renewable energy and waste recycling as well as use of green and
blue networks. 
Easy to Move Around and Beyond
The proposal considers the connectedness of the site for people before the movement of
motor vehicles, by prioritising sustainable and active travel choices, such as walking, cycling
and public transport and ensuring layouts reflect likely desire lines, through routes and
future expansions. 
Detailed Policy 14-Green & Bue Infrastr
Policy 14: 
Green and Blue Infrastructure 
All proposals should seek to protect, create, enhance and/or enlarge our natural features
and habitats which make up our green and blue infrastructure (including open space),
ensuring no unacceptable adverse environmental impacts occur.
Green and blue infrastructure should be multi-functional, accessible and integral to its local
circumstances. For example, Sustainable Urban Drainage Systems (SuDS) have the
potential to play a key role in the delivery of meaningful blue and green infrastructure,
providing amenity and improving biodiversity as well as providing a sustainable flood risk
solution. We will require details of the proposed arrangements for the long-term
management and maintenance of green infrastructure, and associated water features, to
form a key part of any proposal.
Our Open Space Strategy (2016-2026) highlights the need for an audit which identifies
valued and functional green and blue infrastructure or open space capable of being brought
into use to meet local needs. We will support the temporary use  of unused or underused
land as green infrastructure including where it consists of advanced structure planting to
create landscape frameworks for future development. Support will be given to proposals
37

Page 38

which seek to enhance biodiversity from new development where possible, including the
restoration of degraded habitats and the avoidance of further fragmentation or isolation of
habitats. We will also support proposals that are in accordance with the vision and
outcomes of the Central Scotland Green Network as well as those of the Garnock
Connections Project. 
Detailed Policy 15-Landscape & Seascape
Policy 15: 
Landscape and Seascape 
We will support development that protects and/or enhances our landscape/seascape
character, avoiding unacceptable adverse impacts on our designated and non-designated
landscape areas and features. In particular, we will consider the following: 
a) National Scenic Areas
Development that affects the North Arran National Scenic Area including the need to protect
existing sport and recreation interests, will only be supported where:
i) the objectives of the designation and the overall integrity of the area will not be
compromised; or
ii) any significant adverse effects on the qualities for which the area has been
designated are clearly outweighed by social, environmental or economic benefits of national
importance. 
b) Special Landscape Areas
We will only support development which affects Special Landscape Areas where it would
not have an unacceptable impact on their special character, qualities and setting. 
c) Wild Land
We will only support development within Wild Land areas where any significant effects on
the qualities of these areas can be substantially overcome by siting, design or other
mitigation. 
d) Local Landscape Features
Where appropriate, development should take into consideration its individual and
cumulative impacts on landscape features, including:
i) patterns of woodlands, fields, hedgerows and trees;
ii) lochs, ponds, watercourses, wetlands, the coast and wider seascape;
iii) settlement setting, including approaches to settlements;
iv) the setting of green network corridors, such as important transport routes and the
cycle and footpath network;
v) historic, natural and recreational features of interest, skylines and hill features,
including important views to, from and within them. 
For all development with the potential to have an impact on either Landscape Character or
Landscape features (including their setting), appropriate mitigation measures should be
considered as part of any planning application. Where there is potential for development to
result in significant adverse landscape/visual impact, a landscape and visual impact
assessment (LVIA) will be required. The Ayrshire Landscape Character Assessment (SNH,
1998) and North Ayrshire Settlement Development Strategy (Entec, 2008) provide further
38

Page 39

information on designations such as Local Landscape Character Areas and the Potential
Limit of Development Expansion areas as shown on the map on page 81 and on our online
proposals map. These landscape assessment documents, and any new or updated
landscape assessments, will be key considerations in determining whether development
proposals would be acceptable within the landscape. 
Detailed Policy 16- Protection of our
Policy 16: 
Protection of our Designated Sites 
We will support development which would not have an unacceptable adverse effect on our
valuable natural environment as defined by the following legislative and planning
designations; 
a) Nature Conservation Sites of International Importance
Where an assessment is unable to conclude that a development will not adversely affect the
integrity of a site, development will only be permitted where there are no alternative
solutions; there are imperative reasons of overriding public interest; and suitable
compensatory measures are provided to ensure that the overall coherence of the Natura
Network is protected. 
b) Nature Conservation Sites of National Importance
Development affecting Sites of Special Scientific Interest will not be permitted unless it can
be demonstrated that the overall objectives of the designation and the overall integrity of the
designated area would not be compromised, or any adverse effects are clearly outweighed
by social, environmental or economic benefits of national importance.
c) Nature Conservation Sites of Local Importance
Development adversely affecting Local Nature Reserves or Local Nature Conservation
Sites will generally not be permitted unless it can be demonstrated the overall objectives of
the designation and the overall integrity of the designated area would not be compromised,
or any adverse effects are clearly outweighed by social, environmental or economic benefits
of local importance. 
d) Marine Protected Areas
Development likely to have an adverse effect on the protected features of South Arran MPA
will not be supported. Proposals are also required to consult with the Clyde Marine Planning
Partnership (CMPP). 
e) Biodiversity Action Plan Habitats and Species
Development adversely affecting priority habitats or species set out in the North Ayrshire
Local Biodiversity Action Plan will not be permitted unless it can be demonstrated the
impacts are clearly outweighed by social or economic benefits of local importance.
f) Protected Species
Development likely to have an unacceptable adverse effect on;
i) European Protected Species (see Schedules 2 & 4 of the Habitats Regulations 1994
(as amended) for definition); Birds, Animals and Plants listed on Schedules 1, 5 and 8
(respectively) of the Wildlife and Countryside Act 1981 (as amended); or badgers, will only
be permitted where the applicant can demonstrate that a species licence is likely to be
granted.
39

Page 40

ii) The Scottish Biodiversity List (SBL) of animals, plants and habitats that Scottish
Ministers considered to be of principle importance for biodiversity conservation in Scotland. 
Detailed Policy 18 - Forestry, Woodland
Policy 18: 
Forestry, Woodland, Trees and Hedgerows 
Development proposals will only be supported when it would not result in the loss or
deterioration of an ancient or long- established plantation or semi-natural woodland unless
there are overriding public benefits from the development that outweigh the loss of the
woodland habitat. 
Where development includes the removal of woodland, the Scottish Government's Control
of Woodland Policy and the current Ayrshire and Arran Woodland Strategy including
relevant compensatory planting requirements will be taken into account. 
Where the loss of trees, hedgerows or woodlands of merit is unavoidable and compensatory
planting is required, replacement trees should be of a similar scale and massing to the loss
or if smaller there should be additional tree planting committed to ensure a net gain is
achieved. We will also expect developers to engage with Forestry Commission Scotland. 
We recognise that trees and woodlands are an important yet dynamic part of our landscape.
In recognition of this where a tree (or group of trees) is of significant value to public amenity
or where they strongly contribute to the character of a Conservation Area we may consider
promoting a formal Tree Preservation Order (TPO). We will normally only do this when there
is a clear, pressing and immediate threat to a valuable tree (or group of trees) - not as a
matter of course and not in conflict with good arboricultural practice and management. In the
case of works to trees covered by a tree preservation order we will support management
schemes and maintenance works that adhere to good arboricultural practice. 
Generally, we will support proposals for dedicated timber export facilities as well as timber
export developments that are combined with other marine based activities on Arran where
there are no unacceptable adverse environmental impacts and align with our Placemaking
policy. Proposals should also align with Policy 28: Transport as an Economic Driver. 
Supplementary Guidance: Trees and Development provides guidance on information
required to be submitted as part of planning applications involving tree works as well as
matters to consider when designing and constructing development to minimise impacts on
trees. 
Detailed Policy 23-Flood Risk Management
Policy 23: 
Flood Risk Management 
We will support development that demonstrates accordance with the Flood Risk Framework
as defined in Scottish Planning Policy and shown in schedule 7, relevant flood risk
management strategies and local flood risk management plans. We will also support
schemes to manage flood risk, for instance through natural flood management, managed
coastal realignment, wetland or green infrastructure creation.
40

Page 41

Generally, development should avoid locations of flood risk and should not lead to a
significant increase in the flood risk elsewhere. Land raising and elevated buildings will only
be supported in exceptional circumstances, where it is shown to have a neutral or better
impact on flood risk outside the raised area. 
Development proposals should:
o Clearly set out measures to protect against, and manage, flood risk.
o Include sustainable urban drainage systems (SuDS) where surface water is
proposed to be discharged to the water environment, in accordance with the Water
Environment (Controlled Activities) (Scotland) Regulations 2011 as amended.
o Include provision of temporary/construction phase SuDS.
o include appropriate long-term maintenance arrangements.
o Be supported by an appropriate flood risk assessment where at risk of flooding from
any source in medium to high risk areas and for developments in low to medium risk areas
identified in the risk framework (schedule 7).
o Take account of SEPA's flood risk and land use vulnerability guidance (2018) and
any relevant updates to, or replacements of this guidance.   
Detailed Policy 29 - Energy Infrastructure
Policy 29: 
Energy Infrastructure Development 
We will support development proposals for energy infrastructure development, including
wind, solar, tidal, cropping and other renewable sources, where they will contribute
positively to our transition to a low carbon economy and have no unacceptable adverse
environmental impacts, taking into consideration (including cumulatively) the following: 
Environmental
o Communities and individual dwellings - including visual impact, residential amenity,
noise and shadow flicker;
o Water quality;
o Landscape - including avoiding unacceptable adverse impacts on our landscape
designations;
o Effects on the natural heritage - including birds;
o Carbon rich soils including peat;
o Impacts on the historic environment - including scheduled monuments, listed
buildings and their settings. 
Community
o Establishing the use of the site for energy infrastructure development;
o providing a net economic impact - including socio-economic benefits such as
employment, associated business and supply chain opportunities;
o Scale of contribution to renewable energy generation targets;
o Public access - including impact on long distance walking and cycling routes and
scenic routes identified in the National Planning Framework;
o Impacts on tourism and recreation;
o Specific locational opportunities for energy storage/generation. 
41

Page 42

Public Safety
o Greenhouse gas emissions;
o Aviation and defence interests and seismological recording;
o Telecommunications and broadcasting installations - particularly ensuring that
transmission links are not compromised; radio telemetry interference and below ground
assets;
o Road traffic and adjacent trunk roads;
o Effects on hydrology, the water environment and flood risk including drinking water
quality and quantity (to both the public and private water supplies);
o Decommissioning of developments - including ancillary infrastructure, and site
restoration and aftercare. 
Proposals should include redundancy plans which will demonstrate how apparatus will be
timeously removed as reasonably soon as the approved scheme ceases operation. There
may be a requirement for financial bonds to ensure that decommissioning can be achieved.
Taking into consideration the above, proposals for wind turbine developments should
accord with the Spatial Framework (as mapped) and consider the current Landscape
Capacity Study for Wind Farm Development in North Ayrshire. This study will be used as a
point of reference for assessing all wind energy proposals including definitions of what small
to large scale entails. 
Buildings: Low and Zero Carbon Generating Technology 
Proposals for all new buildings will be required to demonstrate that at least 10% of the
current carbon emissions reduction set by Scottish Building Standards will be met through
the installation and operation of low and zero-carbon generating technologies. A statement
will be required to be submitted demonstrating compliance with this requirement. The
percentage will increase at the next review of the local development plan. 
This requirement will not apply to: 
1. Alterations and extensions to buildings 
2. Change of use or conversion of buildings 
3. Ancillary buildings that stand alone and cover an area less than 50 square metres 
4. Buildings which will not be heated or cooled, other than by heating provided solely for
frost protection. 
5. Buildings which have an intended life of less than two years. 
2. Consultations and Representations 
A range of consultations for Section 36 applications are undertaken by the Energy Consents
Unit of the Scottish Government, who have the statutory duty to determine such
applications. In this respect, the Council is a statutory consultee. Publicity for proposals of
this type is carried out by the Energy Consents Unit, who would consider any public
comments they receive. 
To inform the Council's position on the proposals, a number of internal consultations were
undertaken, and are summarised below:
42

Page 43

NAC Active Travel & Transportation - No objections, and recommend that, for all the
junctions accessing the site, visibility splays of 2.5 metres by 120 metres, in both directions,
must be provided and maintained at the junction with the public road. No item with a height
greater than 1.05 metre above adjacent carriageway level must be located within these
sightline triangles. 
Response: Noted. A condition requiring the implementation of the above sightlines could be
recommended in the Council's response. 
NAC Flooding Officer - Advise that SEPA's flood hazard map indicates that parts of the
site are at high and medium risk of surface water flooding and the application documents
show that there is a network of drainage ditches within and around the site. The site plan
shows that the proposed solar panels would generally be located away from the areas of
indicative flood risk, which is an approach that NAC would support. NAC Flooding would,
however, strongly advise that the recommendations of the applicant's Flood Risk and
Drainage Assessment are either incorporated into the application drawings or that the
implementation and maintenance of the recommended actions are controlled by conditions
that would be attached to any consent. 
Response: Noted. A condition requiring the implementation and maintenance of the works
indicated above could be recommended in the Council's response. 
3. Analysis 
As noted above, the proposal requires to be considered against Strategic Policy 1 (The
Countryside Objective), Strategic Policy 2 (Placemaking), Policy 14 (Green & Blue
Infrastructure), Policy 15 (Landscape & Seascape), Policy 16 (Protection of our Designated
Sites); Policy 18 (Forestry, Woodland, Trees and Hedgerows), Policy 23 (Flood Risk
Management) and Policy 29 (Energy Infrastructure Development).  Each policy is
considered individually below. 
Strategic Policy 1 (The Countryside Objective)
Part c) of SP1 states that, in principle, the Council will support proposals in the countryside
for "developments with a demonstrable specific locational need including developments for
renewable energy production ie. wind turbines, hydroelectric schemes and solar farms." In
this case, it is proposed to develop a solar farm with battery storage and ancillary
infrastructure.  The majority of the site would retain its agricultural use, with improved
management of peatland and enhanced ecology. It is considered that the proposal has a
specific locational need and accords with SP1. 
Strategic Policy 2 (Placemaking)
The intention of SP2 is to ensure that all development contributes to making quality places. 
It safeguards, and where possible enhances, environmental or amenity impacts. In this
case, it is noted that the proposed solar farm would be sited so as to minimise impacts on
housing near the site.  This would be achieved by siting solar panels away from the edges of
fields near housing; retaining and restoring hedgerows and ensuring that the site
compounds (eg. battery storage area, sub-station area) would be screened by existing
woodland plantations.  It is considered that, in certain places, the woodland plantations are
in need of enhancement through additional or replacement planting to reinforce their
43

Page 44

effectiveness for screening and amenity purposes during the lifespan of the development. A
condition could be recommended in this respect. It should be noted that the proposed
racking system for mounting the solar panels would not exceed 3m above ground level, thus
minimising the visual impact on the flat, plateau landscape of the site. CCTV poles would
also be erected around the site, to enable monitoring of the panels and other plant to take
place remotely, the height of which would also be 3m.  Again, the landscape and visual
impact of these vertical elements would not be significant across the expansive site area,
being close to ground level and screened from external viewpoints by hedgerows and, in
places, woodland. There would be no other amenity impacts arising from the development
in terms of noise, overshadowing or privacy impacts. The glint and glare assessment
indicates that the panels would be black in colour and non-reflective. In summary, it is
considered that the proposals are acceptable in terms of SP2. 
Policy 14 (Green & Blue Infrastructure) 
The intention of this policy is to require that all proposals "seek to protect, create, enhance
and/or enlarge our natural features and habitats which make up our green and blue
infrastructure."  As noted above, the proposed development would include measures to
enhance biodiversity through the restoration of hedgerows, the restoration of degraded peat
and the planting of wild flowers following ground disturbance.  The policy notes that "support
will be given to proposals which seek to enhance biodiversity…. including the restoration of
degraded habitats and the avoidance of further fragmentation or isolation of habitats." It is
noted that the peatland restoration would bring a significant part of the site up to a standard
of habitat closer to that of the neighbouring SSSI/SPA designation at Dykeneuk Moss.  The
benefits of the development, in terms of habitat restoration and creation, would therefore
exceed the baseline conditions of the land in terms of its current use.  The proposals are
therefore acceptable in terms of Policy 14. 
Policy 15 (Landscape & Seascape)
The policy sets out to support development that protects and/or enhances our
landscape/seascape character, avoiding unacceptable adverse impacts on both designated
and non-designated landscape areas. The landscape character of the site and its
surroundings is with the 'Ayrshire Lowlands' in terms of the landscape character type
defined in the 'Ayrshire Landscape Assessment' produced in 1998 for the former Scottish
Natural Heritage. 'Ayrshire Lowlands' is described as "an extensive area of agricultural
lowland which occupies much of the Ayrshire basin…. The landform is surprisingly complex,
dissected by many burns and streams draining to incised main river valleys to create an
undulating lowland landscape. Landcover is predominantly pastoral. Cattle, sheep and
grassland are common…. A number of placenames include the term 'moss', reflecting the
presence of peat bogs and mires. Whilst many of these have been drained and reclaimed
for agriculture, some areas of peatland remain."   
The commentary goes on to state that "fields are often regular in shape and enclosed by
beech or hawthorn hedges. For the most part the hedges are in good condition. Many field
boundaries are also marked by mature hedgerow trees. These trees give the landscape a
surprisingly wooded character, often forming avenues along minor roads. In places this
structure has begun to decline as trees have been felled and not replaced."   
It is considered that, as part of the landscaping and mitigation works associated with the
proposals, the opportunity has arisen to restore not only the peatland and hedgerows but
also the hedgerow trees which were once typical of the locality. It is noted that most
hedgerows along the edges of the site have been cut back quite severely, with very few
44

Page 45

hedgerow trees remaining. Such tree planting within the hedgerows would help to filter
views towards the rows of solar panels, repair and enhance landscape character and
promote further biodiversity within this locality. Tree planting within hedgerows would not
form a dense barrier to light and would therefore be unlikely to have any material impact on
the performance of the solar panels. Elsewhere, it has been noted that within the woodland
areas that would be utilised for screening of battery storage units and other items of plant,
there is evidence of ash dieback and limited natural regeneration.  In these areas, work
would be required to restore the woodlands and thus repair the decline to landscape
character. A condition could be recommended to secure the details of such planting.
Subject to such a condition, the proposals would be acceptable in terms of Policy 15. 
Policy 16 (Protection of our Designated Sites)
The policy supports proposals which would not have an unacceptable effect on our valuable
natural environment as defined by a variety of legislative and planning designations. As
noted above, the site is close to the Dykeneuk Moss SSSI/SPA and Nature Conservation
Site of Local Importance. No part of the development would take place within the boundary
of these designations. The proposal would, however, enhance habitats within the boundary
of the solar farm site which would have a beneficial impact on the ecology of the SSSI (e.g.
peatland restoration).  As such, the proposals would be acceptable in respect of Policy 16. 
Policy 18 (Forestry, Woodland, Trees and Hedgerows) 
The policy seeks to resist the loss of established woodlands, trees and hedgerows. Where
loss is unavoidable as a result of development, compensatory planting is required. As
discussed above, the opportunity has arisen to increase tree planting at various locations
within the site, to improve woodland and to reinforce established hedgerows.  Such planting
would compensate for the sections of hedgerow to be removed for site accesses (although
existing field gates would be used whenever possible). Subject to the recommended
condition discussed above, the proposals would be acceptable in terms of Policy 18. 
Policy 23 (Flood Risk Management)
The policy supports development that demonstrates accordance with the Flood Risk
Framework shown in Schedule 7 of the LDP. The policy notes that development should
generally avoid locations of flood risk and should not lead to a significant increase in the
flood risk elsewhere.  Sustainable drainage systems should be incorporated into new
development.  In this instance, the consultation includes a flood risk and drainage
assessment.  This has been reviewed by the Council's Flooding Officer and found to be fit
for purpose.  A general condition is recommended that would require the implementation of
all measures identified in the supporting information, including flood protection and drainage
works, to be implemented during the course of the development. A Construction
Environmental Management Plan (CEMP) condition is also recommended. 
Policy 29 (Energy Infrastructure Development) 
This policy states that support will be given to energy infrastructure development, including
solar, where it will contribute to the transition to a low carbon economy and have no
unacceptable adverse environmental impacts. The policy requires that consideration be
given to environmental, community and public safety aspects of a development. 
In terms of environmental impacts, the proposals would be acceptable in terms of the
detailed policies considered above, resulting in a biodiversity net gain in comparison with
the baseline conditions (farmland). 
45

Page 46

In terms of community impacts, it is considered that the proposals would contribute
significantly to the generation of renewable energy targets. There are no plans to create
pathways through the site (there are no designated footpaths within the site at present). It is
not considered that the proposals would have any adverse impacts on tourism and
recreation. The opportunity has been taken to provide battery storage within the site, which
would be screened from the nearby public road by woodland. 
In terms of public safety, the internal consultations carried out do not indicate any areas of
concern with the proposals. A Construction Environmental Management Plan (CEMP) could
be included as a recommended condition. 
The decommissioning of the site following its 40-year operational period could be secured
by condition, which could be recommended as part of the Council's consultation response.   
The proposals are considered to accord with Policy 29. 
The application has also been assessed against the adopted National Planning Framework
4 and it has been determined that the proposal does not raise any significant strategic
planning issues which conflict with the foregoing assessment. In respect of this proposal, it
is noted that the key aims of NPF 4 relate to the climate and nature crises.  The proposed
development would generate electricity from a renewable source, as well as providing
battery storage facilities to improve the efficiency and effectiveness of the scheme. In
addition, considerable benefits for biodiversity and nature would be created through
peatland restoration, hedgerow restoration and new planting of pollen rich wild flowers.  The
underlying agricultural land use would also be retained in the interests of food production. 
Taking the foregoing into account, it is recommended that the Council, as Planning
Authority, does not object to the proposed development and recommends the undernoted
conditions to the Scottish Government's Energy Consents Unit for its consideration. 
4. Full Recommendation 
Approved subject to Conditions 
Reasons for Decision 
Condition 
1. That the development shall be implemented in accordance with the submitted plans,
drawings and recommendations contained in the application (inclusive of all associated
supporting reports and documentation) unless otherwise indicated below, all to the
satisfaction of North Ayrshire Council as Planning Authority. 
Reason 
To secure the implementation of the development in accordance with the supporting
information. 
Condition 
2. That prior to the commencement of the development, the applicant shall submit a
Construction Environmental Management Plan for the written approval of North Ayrshire
Council as Planning Authority, which shall address site construction traffic routes and
management, working hours, dust suppression measures, noise control measures and
46

Page 47

surface water run-off control measures.  Thereafter, the development shall be implemented
in accordance with such details as may be approved to the satisfaction of North Ayrshire
Council as Planning Authority. 
Reason 
In the interests of environmental protection during the construction phase. 
Condition 
3. That, for all roads/tracks accessing the site, visibility splays of 2.5 metres by 120
metres, in both directions, shall be provided and maintained at the junction with the
associated public road. No item with a height greater than 1.05 metre above adjacent
carriageway level must be located within these sightline triangles. 
Reason 
In the interests of road safety. 
Condition 
4. That, prior to the commencement of the development, the applicant shall submit for
the written approval of North Ayrshire Council as Planning Authority a scheme of
landscaping and tree planting. The scheme shall include: 
- the restoration of existing hedgerows, including the planting of hedgerow trees
throughout the site;
- the restoration of existing woodland areas, including the removal of diseased/dead
trees and details of their replacement;
- details of tree protection measures;
- details of wild flower planting; 
The landscaping and tree planting scheme shall include details of species, planting
densities, soil treatment and aftercare. Thereafter, the scheme as may be approved shall be
implemented prior the development becoming operational and managed thereafter to the
satisfaction of North Ayrshire Council as Planning Authority. 
Reason 
To secure a comprehensive scheme taking account of landscape character, visual
impact, biodiversity and habitats. 
Condition 
5. That, prior to the commencement of any peatland restoration, the applicant shall
submit for the written approval of North Ayrshire Council as Planning Authority a detailed
scheme of such works, including their timing and future management arrangements.
Thereafter, the scheme as may be approved shall be implemented and managed during the
lifespan of the solar farm to the satisfaction of North Ayrshire Council as Planning Authority. 
Reason 
To secure a comprehensive scheme taking account of biodiversity and habitats. 
Condition 
6. That, unless otherwise agreed in writing by North Ayrshire Council as Planning
Authority, the rated noise level, as defined in BS 4142:2014+A1:2019, from the operation of
fixed plant and machinery, including the battery storage facilities, sub-station, transformers,
47

Page 48

etc. shall not exceed the background noise level at the curtilage of any noise sensitive
property existing or consented at the time of the application. 
Reason 
To safeguard the residential amenity of houses within the vicinity of the site from
noise generated by fixed plant and machinery. 
Condition 
7. That the solar farm and battery storage facilities hereby permitted shall be removed
and the land restored for agriculture and/or nature conservation purposes within 40 years of
the date of the consent, all to the satisfaction of North Ayrshire Council as Planning
Authority, unless otherwise agreed beforehand. 
Reason 
To make provision for future land use to reflect that the operational phase of the
development is estimated to be 40 years. 
James Miller 
Chief Planning Officer           
For further information please contact Mr A Hume Planning Officer on 01294 324318. 
48

Page 49

Appendix 1 – Location Plan           
DO NOT SCALE Reproduced from the Ordnance Survey mapping with the permission of the Controller of Her Majesty’s Stationery
Office © Crown Copyright.  Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings.
North Ayrshire Council Licence Number 100023393. 
49

Page 50

50

Page 51

NORTH AYRSHIRE COUNCIL                                                                            
22 March 2023 
Planning Committee Report
Title: Grouping of Trees in the grounds surrounding Moorpark
House, Kilbirnie
Purpose: To advise Committee regarding the process and merits of
protecting a group of trees located on the grounds of Moorpark
House, Kilbirnie via a Tree Preservation Order (TPO) 
Recommendation: That the Council serves a Tree Preservation Order (TPO) under
S.160 1997 Town and Country Planning Act.   
1. Executive Summary 
1.1 This report is in response to a request from a member of the public relating to the
protection offered to a grouping of trees in and around the grounds of Moorpark House.
It was brought to the Council’s attention that works have taken place on some of the
trees. 
1.2 Some of the trees are afforded some protection by a planning condition in terms of the
Planning Permission (ref: 06/00001/PP). The Council has received complaints that
works were taking place on the trees.   
1.3 It is considered that the trees meet the criteria for a Tree Preservation Order (TPO). A
TPO would formalise and provide clarity to the level of protection offered. It is therefore
recommended that a TPO is served in the interests of protecting public amenity. This
report outlines the reasons for this recommendation and the procedures involved. 
2. Background 
2.1 Concerns have been raised from a member of the public about the protection afforded
to the trees, some of which are currently subject to works, located within the grounds of
Moorpark House. Following receipt of this request, Council Officers conducted a site
visit and desk top analysis to assess the suitability of a Tree Preservation Order under
relevant legislation. 
2.2   The Council as the Planning Authority has the power under S160 of the Town and
Country Planning (Scotland) Act 1997 (as amended by the Planning etc 2006
(Scotland) Act) to make an order specifying any trees, groups of trees or woodlands in
their district and providing for their preservation. The Council can exercise these
powers providing the tree (or grouping of trees) meets either or both the following
requirements:
Agenda Item 7
51

Page 52

(a) that it is expedient in the interests of amenity to make that provision,
(b) that the trees, groups of trees or woodlands are of cultural or historical significance. 
It should be noted that under the legislation, a TPO cannot be served due to the trees
being at risk alone. The only two criteria in which a Planning Authority can create a
provision are as noted above. 
2.3   The site surrounding Moorpark House has been subject to a variety of Planning
Permissions. Planning Permission (ref: 06/00001/PP), which approved the use of a
hotel with associated landscaping, is considered most relevant relating to the protection
of the trees. The consent was subject to a condition which requires written approval
from the Council as the Planning Authority before any works taking place to any trees
within the site.  As some time has passed since this consent and the site has been
subject to other consents, the validity and extent of protection afforded has been
disputed by the owner. Therefore, in the interests of expediency, consideration is
required to provide formal protection of the woodland to provide clarity to the level of
protection. The Council can create such an order under sc160 of the 1997 Town and
Country Planning (Scotland) Act.   
2.4 Following the desktop assessment, Officers conducted a site visit to determine whether
the trees and woodland have the potential to meet the criteria for formal protection. 
Within the former grounds of Moorpark House, the species and ages of trees found
were mixed, ranging from Scots Pine, Sycamore, Lime, Larch and Horse Chestnut to
name a few. It is noted that the former grounds of Moorpark House are now in separate
ownerships. The area identified for the proposed TPO reflects both physical boundaries
at the site, and historic Planning Permissions. 
2.5 Attention now turns to the criteria for creating TPOs. With regards to contribution to
public amenity, it is clear the trees contribute significantly. The trees are an important
characteristic of the local area and are visible from various parts of Kilbirnie and its
fringes. The western part of the proposed TPO area is directly adjacent to a Core Path,
which leads from the edge of the town centre to the more rural northwest fringes of the
settlement. The site is also allocated as Open Space within the Local Development
Plan, which green infrastructure such as trees play a significant role in contributing to
amenity and setting. 
2.6 Taking the above into account, it is considered that the trees meet the criteria for a
Tree Protection Order as trees contribute significantly to public amenity.
2.7   The legislation states that a Tree Preservation Order may, in particular, make
provision—
(a) for prohibiting (subject to any exemptions for which provision may be made by the
order) the cutting down, topping, lopping, uprooting, wilful damage, or wilful destruction
of trees except with the consent of the planning authority, and for enabling that
authority to give their consent subject to conditions.
52

Page 53

(b) for securing the replanting, in such manner as may be prescribed by or under the
order, of any part of a woodland area which is felled in the course of forestry operations
permitted by or under the order.
(c) for applying, in relation to any consent under the order, and to applications for such
consent, any of the provisions of the 1997 Town and Country Planning (Scotland) Act. 
2.8 The Town and Country Planning (Tree Preservation Order and Trees in Conservation
Areas) (Scotland) Regulations 2010 outlines the procedures in which Planning
Authorities can exercise their powers. If the Council serves a TPO, it is required to be
confirmed within 6 months of the date of that notice. Within this time, all interested
parties such as Landowners, Occupiers and Lessees must be notified and given a time
to respond to the notice of no less than 28 days. The notice is required to be advertised
locally in the relevant newspapers that serve the area. 
2.9  The six-month period would allow the Council to consult with stakeholders and gain
direction from Committee on whether to confirm the TPO (or amend it) and put it in
place in perpetuity. 
2.10 It should be noted that protection of the trees under a TPO does not provide absolute
protection to all the trees on the site. Protection via a TPO only means that permission
is required to cut down, top, lop, uproot trees from the Council. Should the removal of
trees be part of any future planning consent, then that would supersede the TPO.
Should a TPO be created however, then the impacts upon the trees may become a
material consideration when determining a planning application. 
3. Proposals 
3.1 It is proposed that the Council serves notice of a Tree Preservation Order in the interests
of public amenity. It is then proposed that Council will seek the views of stakeholders and
advertise the notice in the local newspapers. 
3.2  Once the Tree Preservation Order has been created. The Council has 6 months to
confirm the TPO when the Order will be placed within the Scottish Land Register. 
53

Page 54

4. Implications/Socio-economic Duty
Financial
4.1 None. The TPO can be created and advertised within existing budgets. 
Human Resources 
4.2 None. The TPO can be created and advertised within existing staff resources. 
Legal 
4.3 Should a TPO be confirmed, a notice is required to be written and recorded in the
Scottish Land Register. 
Equality/Socio-economic 
4.4 Trees can have numerous benefits for those seeking tranquillity. The grounds, that the
trees are located in, play a significant role in society and are part of a community that
use the church and the grounds. 
Climate Change and Carbon 
4.5 Trees can have positive impacts on the climate through carbon sequestration. 
Key Priorities 
4.6 The proposed TPO would align with the Council Plan Priorities of ‘Vibrant, welcoming,
and attractive places’ and ‘A sustainable environment.’ 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1  Consultation is required with landowners, occupiers and lessees and published in a
local paper with at least 28 days given for response. 
JAMES MILLER
Chief Planning Officer 
For further information please contact Thom Ledingham, Planning Officer (Strategic
Planning),
on 01294 324 623 
Background Papers
Appendix 1 – Proposed Tree Preservation Order 
54

Page 55

55

Page 56

56

Page 57

NORTH AYRSHIRE COUNCIL 
22nd March 2023 
Planning Committee 
Title:    Notice under Section 145 of the Town and Country
Planning (Scotland) Act 1997: 17 Auldlea Road, Beith 
Purpose:  To seek authority to serve a Notice under Section 145 of the
Town and Country Planning (Scotland) Act 1997 requiring
compliance with Condition 1 of planning permission (ref.
22/00536/PP) 
Recommendation:  That the Committee grants authority for the service of a Notice
under Section 145 of the Town and Country Planning (Scotland)
Act 1997 requiring compliance with Condition 1 of planning
permission ref. 22/00536/PP at 17 Auldlea Road, Beith 
1. Executive Summary 
1.1 To seek authority to serve a Breach of Condition Notice requiring compliance with
condition 1 of planning permission 22/00536/PP which requires details of obscure
glazing to be fitted to the north elevation of a consented conservatory to the rear of a
house at No. 17 Auldlea Road, Beith, and retained thereafter. 
1.2 The condition was required to safeguard the privacy and amenity of neighbouring
housing. 
2. Background 
2.1 On 5th June 2022 it was brought to the Council’s attention that a conservatory extension
had been erected to the rear of an end-terraced dwellinghouse at 17 Auldlea Road,
Beith. Public concerns had been raised regarding the scale and height of the
conservatory. Initial checking of the approved building warrant drawings showed that
the conservatory was to be built within the limits of Householder Permitted Development
Rights (HPDR), meaning that a planning application did not require to be submitted.
However, for the avoidance of doubt, the conservatory was measured on site and was
found to exceed the height limits set out in Class 1A of the HPDR. Consequently, an
application for planning permission was requested from the householder at 17 Auldlea
Road, Beith. 
Agenda Item 8
57

Page 58

2.2 A retrospective planning application was duly received in July 2022 and validated on 1st
August 2022. Through assessment of the planning application concerns were raised
about the impact of the conservatory on the privacy of the attached neighbouring
dwelling. Mitigation measures were discussed with the applicant’s agent. It was
concluded that obscure glazing should be installed on the north elevation of the
conservatory to lessen the impact of potential overlooking and loss of privacy to the
attached neighbouring property. It was agreed with the agent that the matter could be
addressed by a condition. The planning application was duly granted, subject to
conditions, on 27th September 2022. 
2.3 Condition 1 of the planning permission reads as follows:         
“That within four weeks of the date of this decision, details of the obscure glazing to be
fitted to the north elevation of the conservatory hereby approved shall be submitted for
the written approval of North Ayrshire Council as Planning Authority. Thereafter, the
method of obscure glazing as may be approved shall be installed within 8 weeks of the
date of this decision, and permanently retained thereafter, all to the satisfaction of North
Ayrshire Council as Planning Authority”. 
The reason for the condition was “to safeguard the privacy and amenity of neighbouring
housing”. 
2.4.  As noted above, condition 1 states that details of the obscure glazing required to be
submitted within four weeks of the date of the decision (27th September 2022). However,
the required details were not received within four weeks of the decision notice. Several
reminders were sent. To date, the required details have still not been received. The
second part of the condition stated that the method of obscure glazing as approved
required to be installed within 8 weeks of the decision. To date, the obscure glazing has
not been installed to the north elevation of the conservatory.   
2.5  Correspondence with the agent and applicant has taken place. However, there was
disagreement from the applicant on the need for the condition. The applicant was
advised that they could request a local review of the condition within 3 months of 27th
September 2022. An appeal to the Local Review Body was not submitted within the
required time. The applicant was also advised that there is a statutory right to apply to
the planning authority for the amendment/removal of the condition under Section 42 of
the Town and Country Planning (Scotland) Act 1997 (the Act). 
2.6   Over five months have elapsed since the date of the decision. It is considered that the
applicant has had sufficient time to comply with, or to challenge, the condition. 
2.7 To remedy the breach, it is recommended that authority for the service of a Notice under
Section 145 of the Act (a “Breach of Condition Notice”) be approved. A Breach of
Condition Notice would require the applicant to adhere to the requirements of condition
1 of the above planning permission and install obscure glazing to the north elevation of
the conservatory. The Notice would take effect not less than 35 days from the date on
which it is served. There is no right of appeal against such a Notice. The service of a
Notice would remedy the breach and address the requirements of the condition. The
Council could report those responsible for not complying with a Breach of Condition
Notice to the Procurator Fiscal, should its requirements not be met. 
3. Proposals 
58

Page 59

3.1 In the interest of the amenity of the area and to safeguard the privacy and amenity of
neighbouring housing, it is recommended that the Committee approve the service of a
Notice under Section 145 of the Town and Country Planning (Scotland) Act 1997 (as
amended) to require compliance with condition 1 as follows: 
(i) That details of the obscure glazing to be fitted to the north elevation of the
conservatory at 17 Auldlea Road shall be submitted for the written approval of
North Ayrshire Council as Planning Authority within two weeks of the notice coming
into effect. Thereafter, the method of obscure glazing as may be approved shall be
installed within 8 weeks of the effective date of this Notice, and permanently
retained thereafter, all to the satisfaction of North Ayrshire Council as Planning
Authority. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The service of the Notice can be addressed with existing budgetary provision. 
Human Resources 
4.2 The service of the Notice can be addressed with existing staff resources. 
Legal 
4.3 The proposed Breach of Condition Notice is in accordance with Statutory Regulations.
Non-compliance with such a Notice is an offence and the Council, as Planning Authority,
could report such an offence to the Procurator Fiscal. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon Environmental and Sustainability 
4.5 None 
Key Priorities 
4.6 The proposed Breach of Condition Notice would safeguard the privacy and amenity of
neighbouring housing. 
Community Wealth Building 
4.7 None 
5. Consultation 
5.1 None.
59

Page 60

James Miller
Chief Planning Officer 
For further information please contact Charlotte Conway, Assistant Planning Officer, on
01294 324153. 
Background Papers
0
60

Page 61

Post
LB
MAPLE DRIVE
SYCAMORE AVENUE
5
15
21
29
39
2
11a
22
32
27
44
36
47
7
1
10
16
11
28
2
®
0 25 5012.5 Metres
1:1,000
Notice under Section 145 of the Town and Country Planning
(Scotland) Act 1997: 17 Auldlea Road, Beith
"This map is reproduced from the OS map by North Ayrshire Council with the permission of the Controller of Her Majesty's Stationery Office, © Crown
copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. Licence Number: 100023393."
61

Page 62

62