North Ayrshire Council, Cunninghame House, Irvine KA12 8EE         
Planning Committee 
A Meeting of the Planning Committee of North Ayrshire Council will be held in the
Council Chambers, Ground Floor, Cunninghame House, Irvine, KA12 8EE on
Wednesday, 23 November 2022 at 14:00 to consider the undernoted business. 
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with
provision, by prior notification, for remote attendance by Elected
Members in accordance with the provisions of the Local Government
(Scotland) Act 2003.  Where possible, the meeting will be live-streamed
and available to view at https://north-ayrshire.public-
i.tv/core/portal/home.   
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda. 
2 Minutes
The accuracy of the Minutes of the meeting held on 26 October 2022 will
be confirmed and the Minutes signed in accordance with Paragraph 7 (1)
of Schedule 7 of the Local Government (Scotland) Act 1973 (copy
enclosed). 
3 22/00717/LUE: Hunterston Construction Yard, Fairlie, Largs
Certificate of Lawfulness for existing general industrial use (Class 5). 
4 Notice under Sections 207 and 208 of the Town and Country Planning
(Scotland) Act 1997: Townhead Close, Largs
Submit report by the Chief Planning Officer seeking approval to promote
the stopping up of Townhead Close, Largs under sections 207 and 208 of
The Town and County Planning (Scotland) Act 1997 (copy enclosed). 
5 Urgent Items
Any other items which the Chair considers to be urgent.
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE  
Webcasting
Please note: this meeting may be filmed/recorded/live-streamed to the
Council's internet site and available to view at https://north-ayrshire.public-
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live-streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.
Generally, the press and public seating areas will not be filmed. However,
by entering the Council Chambers, using the press or public seating area
or (by invitation) participating remotely in this meeting, you are consenting
to being filmed and consenting to the use and storage of those images and
sound recordings and any information pertaining to you contained in them
for webcasting or training purposes and for the purpose of keeping
historical records and making those records available to the public. If you
do not wish to participate in a recording, you should leave the
meeting.  This will constitute your revocation of consent.
If you have any queries regarding this and, in particular, if you believe that
use and/or storage of any particular information would cause, or be likely
to cause, substantial damage or distress to any individual, please contact
dataprotectionofficer@north-ayrshire.gov.uk. 
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
Planning Committee Sederunt 
Robert Foster (Chair)
Timothy Billings (Vice-Chair)
Scott Davidson
Stewart Ferguson
Cameron Inglis
Amanda Kerr
Davina McTiernan
Jim Montgomerie
Ian Murdoch
Chloe Robertson 
Chair: 
Apologies: 
Attending: 
3

Page 4

Planning Committee
26 October 2022 
At a Meeting of the Planning Committee of North Ayrshire Council at 2.00 p.m. involving
a combination of participation by remote electronic means and physical attendance
within the Council Chambers, Irvine. 
Present (Physical Participation)
Robert Foster, Timothy Billings, Stewart Ferguson, Cameron Inglis and Davina
McTiernan. 
Present (Remote Participation)
Scott Davidson, Amanda Kerr and Jim Montgomerie. 
In Attendance (Physical Participation)
J. Miller, Chief Planning Officer and A Gemmell, Manager (Planning); R. Lynch, Senior
Manager, J. Niven, Solicitor (Legal Services), A. Little and D. McCaw, Committee
Services Officers (Chief Executive’s Service). 
Apologies
Ian Murdoch and Chloé Robertson. 
Chair
Councillor Foster in the Chair. 
1. Declarations of Interest 
There were no declarations of interest by Members in terms of Standing Order 11 and
Section 5 of the Code of Conduct for Councillors. 
2.   Minutes 
The Minute of the meeting of the Planning Committee held on 28 September 2022 was
confirmed and the Minute signed in accordance with Paragraph 7 (1) of Schedule 7 of
the Local Government (Scotland) Act 1973. 
3. 22/00595/PPM: DSM Nutritional Products UK Ltd, Drakemyre, Dalry 
DSM Nutritional Products UK Ltd have applied for planning permission for the erection
of a chemical production and distribution facility for the manufacture of an animal feed
additive within the site boundary of DSM Nutritional Products at Drakemyre, Dalry. 
The Committee was advised of a late objection from Scottish Gas Network (SGN) relating
to a gas pipeline in the vicinity of the proposed development.  The applicant had further
advised that there would be a corridor of 15m either side of the pipe, ensuring there would
be no encroachment on the pipeline and that consultation had taken place with SGN that
addressed any safety concerns.  It was noted that the development was located
approximately 30m from the pipeline. 
Agenda Item 2
4

Page 5

Discussion took place on the type, range and pitch of noise from the operation of the
proposed facility.  The Chief Planning Officer, advised that Condition 9 stated the
facility must not exceed the background noise level by 5dB or more at the curtilage of
any noise sensitive property.  He undertook to obtain further information from
Environmental Health and advise Councillor Billings accordingly.  It was noted that the
final design of the facility would examine this area in more detail. 
Councillor Inglis, seconded by Councillor McTiernan, moved that the application be
granted, subject to conditions.  There being no amendment, the motion was declared
carried. 
The Committee agreed to grant the application, subject to the following conditions:- 
1.  That the development hereby approved shall be implemented in accordance with
the submitted plans, drawings and recommendations contained in the application
(inclusive of the EIA Report and associated supporting documentation) unless
otherwise indicated below, all to the satisfaction of North Ayrshire Council as
Planning Authority. 
2.  That prior to the commencement of the development hereby approved, the
applicant shall submit a Construction Environmental Management Plan for the
written approval of North Ayrshire Council as Planning Authority, the scope and
content of which shall be informed by the EIA Report. Thereafter, the
development shall be implemented in accordance with such details as may be
approved to the satisfaction of North Ayrshire Council as Planning Authority. 
3.  That prior to the commencement of the development hereby approved, the
applicant shall agree the Remediation Method Statement contained within
Appendix 8-4 of the Environmental Impact Assessment Report with North
Ayrshire Council as Planning Authority. If there is a requirement to re-use site
won material and/or to import material, then the assessment criteria and
sampling frequency that would adequately demonstrate its suitability for use shall
be submitted to and approved by the Planning Authority prior to any material
being used. In addition to this, and in accordance with BS3882:2015 and
BS8601:2013, material to be used in the top 300mm shall be free from metals,
plastic, wood, glass, tarmac, paper and odours. On completion of the works and
at a time and or phasing to be agreed with the Planning Authority, the applicant
shall submit a verification report containing details of the source of the material
and appropriate test results to demonstrate its suitability for use. In addition, on
completion of the proposed works written verification, detailing what was done by
way of any remediation, shall also be submitted for the written approval of North
Ayrshire Council as Planning Authority. 
5

Page 6

4.  That, for the avoidance of doubt, surface water arising from the development of
the site, including during construction operations, shall be treated and managed
using a SuDS system. Prior to the commencement of the development, hereby
approved, confirmation shall be submitted in writing to North Ayrshire Council as
Planning Authority and certified by a suitably qualified person that a scheme to
treat the surface water arising from the development of the site (during
construction and operational phases) has been prepared in accordance with the
principles and practices contained in 'The SuDS Manual' (CIRIA report C753,
published November 2015). Thereafter, the certified scheme shall be
implemented prior to the completion of the development and maintained
thereafter to the satisfaction of North Ayrshire Council as Planning Authority. 
5.  That the presence of any significant unsuspected contamination which becomes
evident during the development of the site shall be reported to North Ayrshire
Council and treated in accordance with an agreed remediation scheme. On
completion of the proposed works written verification, detailing what was done by
way of any remediation, shall also be submitted to the North Ayrshire Council as
Planning Authority. 
6.  That, notwithstanding the plans hereby approved, prior to the commencement of
any building operations, the applicant shall submit for the written approval of
North Ayrshire Council as Planning Authority a detailed schedule of the proposed
external finishes to be used (inclusive of colour scheme). Thereafter, the
development shall be implemented only in accordance with such details as may
be approved, unless otherwise agreed in writing with North Ayrshire Council as
Planning Authority. 
7.  That, prior to the commencement of any landscaping works, the applicant shall
submit for the written approval of North Ayrshire Council as Planning Authority a
finalised scheme of landscaping and woodland planting. The finalised scheme
shall be based on the Indicative Landscape Masterplan hereby approved and
shall include details of species, planting densities, soil treatment and aftercare.
Thereafter, the scheme as may be approved shall be implemented prior the
development becoming operational and retained thereafter to the satisfaction of
North Ayrshire Council as Planning Authority. 
8.  That the development shall be implemented to the satisfaction of North Ayrshire
Council as Planning Authority in accordance with the details set out in the
'Renewable and Low Carbon Technology Feasibility Study' prepared by
BakerHicks dated 18th July 2022, unless otherwise agreed in writing with North
Ayrshire Council as Planning Authority. 
9.  The rated noise level, as defined in BS4142:2014 + AL:2019, from the operation
of the proposed facility must not exceed the background noise level by 5dB or
more at the curtilage of any noise sensitive property. 
6

Page 7

4. 22/00593/PP: 32 Eglinton Street, Beith 
Mr M Jawad, has applied for a change of use of vacant bank premises to a hot food
takeaway to include the erection of a ventilation flue to rear at 32 Eglinton Street,
Beith. Three representations were received and summarised in the report. 
Councillor Billings, seconded by Councillor Ferguson, moved that the application be
granted, subject to conditions.  There being no amendment, the motion was declared
carried. 
1. That prior to the commencement of the development hereby approved, full
details and drawings of the extraction system (including details of odour control
and noise/vibration reduction measures) shall be submitted and approved in
writing by North Ayrshire Council as Planning Authority. Details of the extraction
system will be accompanied by written certification from a member of the
Building & Engineering Services Association, or any other suitably qualified
person, confirming that the extraction system, as designed: 
-  can be affixed to the external wall without the need for approval by a third
party, or alternatively, evidence of such approval; 
- is suitable for use in a catering environment; 
- will provide a suitable rate of extraction above all cooking appliances; 
-  will sufficiently reduce or eliminate odours and efficiently extract products of
combustion, considering the nature of the business, will discharge to the
external air in a suitable area to prevent odours affecting the residents of
surrounding dwellings; and 
-  has incorporated any necessary noise/vibration reduction measures to
ensure operation of the system will not result in intrusive levels of noise
affecting the residents of adjoining and surrounding dwellings. 
Thereafter, the extraction system shall be fully installed as detailed in the
drawings and tested prior to the commencement of the operation, shall always
be in operation when cooking appliances are in use and shall be maintained to
the satisfaction of North Ayrshire Council as Planning Authority. 
2.  The rated noise level, as defined in BS4142, from the operation of
plant/equipment (extraction system and associated flues) shall not exceed the
background noise level by 5dB(A) or more at the curtilage of any noise sensitive
property in the vicinity of the site. 
3.  That the maximum operating hours of the hot food takeaway hereby approved
shall be between 1200 and 2100 hours on any day. The premises shall not
operate out with these hours without the prior written approval of North Ayrshire
Council as Planning Authority.  
7

Page 8

5  22/00137/MSCM: West Byrehill Industrial Estate Byrehill Place, West
Byrehill, Kilwinning 
Persimmon Homes & Ashtenne Industrial Fund LLP have applied for approval of
matters specified in conditions of planning permission in principle ref. 20/00323/PPM
for a residential development comprising the erection of 426 dwellinghouses and
associated infrastructure at West Byrehill Industrial Estate, Byrehil Place, West
Byrehill, Kilwinning.  One representation was received and summarised in the report. 
The Committee was advised of continuing work by the Council’s consultants on the
impact of the development on the road network and their ongoing discussions with the
applicant’s traffic consultants.  In order to protect the safety and free flow of traffic on
the trunk road network near the site, it was considered that a condition was required to
restrict the scale of the development until all road network matters had been agreed. 
Condition 5, as set out in the report, would limit the development, to no more than 108
houses, until all road network matters had been concluded. 
The Committee noted that there was no commitment on the Council to contribute to
the road network improvement. 
Councillor Ferguson, seconded by Councillor Inglis, moved that the application be
granted, subject to conditions.  There being no amendment, the motion was declared
carried. 
1.  That the development hereby approved shall be implemented in accordance with
the details and recommendations contained in the submitted plans, drawings and
supporting documents, all to the satisfaction of North Ayrshire Council as
Planning Authority, unless otherwise agreed in writing. Prior to commencement,
the layout and the site plan shall be updated to show the works to form the flood
storage area including any designed flood flowpath between the open culvert and
the storage area, the details of which shall be agreed in writing before drainage
works commence. 
2.  That the development shall be implemented in accordance with the phasing plan
hereby approved unless otherwise agreed in writing by North Ayrshire Council as
Planning Authority. 
3.  That the landscaping and open space provision shall be provided on a phase-by-
phase basis. The implementation of the main area of open space to serve the
development shall be agreed in writing by North Ayrshire Council as Planning
Authority. 
8

Page 9

4.  That all planting, seeding or turfing comprised in the approved details of
landscaping shall be carried out in the first planting season and seeding seasons
following the occupation of the buildings or the completion of the development,
whichever is the sooner; and any trees or plants which, within a period of five
years from planting die, are removed or become seriously damaged or diseased
shall be replaced in the next planting season with others of a similar size and
species, unless North Ayrshire Council as Planning Authority gives written
consent to any variation. 
5.  The development hereby approved shall commence in phases, and in
accordance with the following transport requirements, unless otherwise agreed in
writing by North Ayrshire Council as Planning Authority and in consultation with
Transport Scotland. For the avoidance of doubt, not more than 108 houses
constructed within the red line boundary shall be occupied until either: 
(i)  An updated transport assessment has been submitted to and approved by
the planning authority, in consultation with Transport Scotland, confirming
that additional development can be accommodated within the capacity of
the trunk road network; OR 
(ii)  An updated transport assessment has been submitted to and approved by
the planning authority, in consultation with Transport Scotland, confirming
that additional development can be accommodated within the capacity of
the trunk road network in the event of the implementation of appropriate
measures identified within the approved transport assessment; OR 
(iii)  The modifications to the A78(T)/A738(T) Pennyburn Roundabout, generally
as indicated in SIAS drawing number 75064-1 titled 'Pennyburn
Roundabout Signalisation - Revision 1', and the modifications to the
A738(T)/Pennyburn Road mini-roundabout and the A738(T) Whitehirst
Road signalised to form a roundabout junction generally as indicated in
SIAS drawing number 75064-5 titled Whitehirst Park Road have been
implemented; OR 
(iv)  North Ayrshire Council as Planning Authority Planning Authority or any
other party has concluded an appropriate legal agreement or agreements
for the funding and implementation of the works to mitigate the
development. 
6.  That, following the completion of the first phase of housing, the Energy Strategy
for the remainder of the development shall be updated for the written approval of
North Ayrshire Council as Planning Authority. The update shall reflect progress
made towards the options identified in the August 2022 version of the Strategy,
namely, centralised air source heat pumps or ground source heat pumps to
distribute heat to individual homes based on demand. Thereafter the updated
Energy Strategy as may be approved shall be implemented to the satisfaction of
North Ayrshire Council as Planning Authority. 
9

Page 10

6  Development Plan Scheme - LDP3 
Submitted report by the Executive Director (Place) providing an update on the
preparation of the Council’s next Local Development Plan (LDP3) and seeking
approval of an updated Development Plan Scheme. The Development Plan Scheme,
was attached at Appendix 1 and set out the timetable for preparing and reviewing the
Local Development Plan. 
The Committee agreed to adopt the Development Plan Scheme as set out in
Appendix 1 to the report. 
The meeting ended at 2.55 p.m. 
10

Page 11

NORTH AYRSHIRE COUNCIL 
Planning Committee 
Locality  North Coast and Cumbraes
Reference 22/00717/LUE
Application Registered 12th October 2022
Decision Due 12th December 2022
Ward North Coast 
Recommendation  Certificate Issued 
__________________________________________________________________ 
Location  Hunterston Construction Yard Fairlie Largs Ayrshire 
Applicant  Clydeport Operations Ltd 
Proposal  Certificate of Lawfulness for existing general industrial
use (Class 5)
___________________________________________________________________ 
1. Description 
This Certificate application seeks to confirm that the use of the site for general industrial
(Class 5) uses is lawful. The site is some 51ha in area, including access road. The access
road connects to the west side of the Hunterston Roundabout on the A78. The access road
is currently closed to traffic but provides access to the site and secondary access to the
Former Hunterston Coal Terminal and to the Hunterston Power Station. The main site itself
projects to the north from the mainland and is an irregular hexagonal shape. The main site is
some 46.5ha in area. 
A Class 5 (General Industrial) use is defined by the Town and Country Planning (Use
Classes) (Scotland) Order 1997 ("the GPDO") as any industrial process not falling within
Class 4 (Business). Class 4 allows any industrial process "which can be carried on in any
residential area without detriment to the amenity of that area by reason of noise, vibration,
smell, fumes, smoke, soot, ash, dust or grit." 
The application site is identified as part of the Hunterston Strategic Development Area and
as a site suitable for Business and Industry in the Local Development Plan. 
2. Consultations and Representations
Agenda Item 3
11

Page 12

Neither any neighbour notification nor publicity measures are required for a Certificate of
Lawfulness applications and no consultations were undertaken on this application. 
3. Analysis 
Section 150 of the Town and Country Planning (Scotland) Act 1997, allows an application to
be made for a Certificate of Lawful Use or Development (CLUD) to ascertain whether any
operations, use of land or building or a breach of a planning condition is or would be lawful.
It is not equivalent in law to a grant of planning permission but the purpose of a CLUD for an
existing use is usually to secure immunity from enforcement action by the Planning
Authority or to provide certainty for future planning applications. 
In this case of a Class 5 (General industry) use, if the use has been in existence for ten
years or more, it is immune from planning enforcement action and a CLUD has to be issued.
The legislation makes it clear that the onus of proof rests with the applicant. In order to
justify the issuing of a CLUD for such an existing use, the applicant must be able to
demonstrate that the use has existed for at least ten years prior to the date of the
application.  The relevant test of such applications is on 'the balance of probability' rather
than 'beyond reasonable doubt.' 
The planning history for the site dates back to the mid-1970s. In July 1975, the Secretary of
State for Scotland granted consent for the construction of the yard. In January 1988
planning permission was granted for the continued use of the site, enlargement of the
platform and associated land reclamation. This permission was subject to a condition which
limited the duration of the use. This permission was extended in December 2005 and May
2011. 
On the 31st of August 2016, planning permission was granted for the removal of the
condition which limited the duration of the use, which meant that the planning permission
would not lapse for the use of the land as a construction yard. This permission allowed the
use of the site for construction and repair. A subsequent application to vary they types of
structures which could be constructed, repaired, or decommissioned was granted 25th of
April 2018 and remains extant. Other planning permissions granted for the site since 2002
include permissions allowing the erection of up to three wind turbines for the purposes of
testing. 
The applicant has submitted evidence of how the site has been used during the above
period. Following creation of the yard until 1985, the site was leased by various engineering
companies undertaking infrastructure projects including construction of oil rig platforms.
Copies of the leases and information of the projects undertaken is provided. For the period
1988 until 1996 the applicant has submitted evidence of further leases by engineering firms.
The construction yard was extended during this period and work carried out included the
construction of the floating Trident Dry Dock. Local newspaper extracts reporting on this
work are also provided. A marketing brochure from the mid-1990s, describing the dry dock
as recent and stating the site is suitable for a range of "marine construction projects," is also
submitted. The brochure includes photographs of a gravity base tank for an oilfield and a
steel platform. A provided newspaper extract places the steel platform work to sometime
after 1993. 
12

Page 13

For the period from 1998 onwards, further details of short leases taken of the site by
fabrication and engineering companies are provided. From 2014 evidence of the permitted
wind turbines, erected for the purposes of testing, being constructed on site is submitted.
The applicant has provided evidence of the use of the site for a period of more than 10
years, as far back as 1975. Whilst this evidence is not consecutive, it provides a picture of a
site where various industrial projects has been undertaken. 
The Council has no evidence to the contrary of these supporting documents. Indeed, the
information the Council, as Planning Authority, retains supports the applicant's narrative as
to the use of the site. This evidence includes the planning records for the site and various
photographs. The Council has photographs of the site from 1995, 2003, 2011 and 2016
which show either industrial processes being undertaken, or the site being occupied by
buildings and structures required for carrying out industrial processes. 
Whilst the above evidence shows a site where various industrial projects have been
undertaken, it is acknowledged that the evidence is not consecutive and there have been
periods where no works on site appear to have occurred. Periods of non-use do not
necessarily affect the lawful use of a site. In planning terms non-use will only affect the
lawful use of a site if it has led to the site being 'abandoned.' Abandonment is considered in
several terms including (i) the period of non-use; (ii) the physical condition of the site; (iii)
whether there has been an intervening use; and (iv) evidence regarding the owner's
intentions. Whilst the evidence of use, particularly for the last 10 years, is intermittent, the
site has been in use for industrial processes. There is no long period of sustained non-use in
the history of the site. The site has been kept throughout in a condition that would allow for
its use for industry. There has been no intervening use of the site that would not fall within
Class 5 of the GPDO. 
The landowner's intentions have been for industrial use as evidenced by the planning
history and the marketing material. The current Local Development Plan (LDP) identifies the
site as being suitable for industrial development. This LDP was adopted in 2019. The
previous LDP was adopted in 2014 and also identified the site as being an industrial area.
The identification of the site for industry was a continuation from the North Ayrshire Local
Plan (excluding Isle of Arran) adopted 2005, the Ayrshire Structure Plan adopted 1999 and
likely prior. Although planning policies have no bearing on the determination of a CLUD, the
policy history shows the long-term identification of the site with industrial uses. 
It is therefore considered that any use of the site for general industrial purposes has not
been abandoned. 
Given all of the above it is considered, on the balance of probability, that the lawful use of
the site is Class 5 (General industry). It is noted that this conclusion would not prejudice any
future planning applications. The principle of the use of the site for industrial purposes has in
effect already been established by the LDP allocation. Planning permission would be
required for development of new buildings and any use which did not fall within general
industry including mixed or 'sui generis' uses, such as scrap yards and waste disposal. 
4. Full Recommendation 
Certificate Issued 
13

Page 14

James Miller 
Chief Planning Officer           
For further information please contact Mr Iain Davies on 01294 324320. 
14

Page 15

Appendix 1 – Location Plan           
DO NOT SCALE Reproduced from the Ordnance Survey mapping with the permission of the Controller of Her Majesty’s Stationery
Office © Crown Copyright.  Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings.
North Ayrshire Council Licence Number 100023393. 
15

Page 16

NORTH AYRSHIRE COUNCIL 
23rd of November 2022 
Planning Committee 
Title:    Notice under Sections 207 and 208 of the Town and
Country Planning (Scotland) Act 1997: Townhead Close,
Largs 
Purpose:  To seek approval to promote the stopping up of Townhead
Close, Largs under sections 207 and 208 of The Town and
County Planning (Scotland) Act 1997. 
Recommendation:  That the Committee grants authority to proceed with promoting
a Stopping Up Order for Townhead Close, Largs. 
1. Executive Summary 
1.1 The approval of the Planning Committee is sought for the promotion of a Stopping Up
Order for Townhead Close, Largs in relation to a Planning Permission (ref.
21/01042/PP) for the development of a retail unit at a site at 123-125 Main Street,
Largs which was granted on 24th May 2022. 
2. Background 
2.1 Planning Permission was granted under delegated powers on 24th May 2022 for the
demolition of all existing buildings and structures on site and the development of a
single retail unit (for convenience retailing purposes), associated car parking, revised
vehicular access, servicing and ancillary development plus hard and soft landscaping
at a site at 123-125 Main Street, Largs. The retail unit is to be operated by an M&S
Foodhall. The site contains the access from Main Street to Townhead Close, a small,
adopted cul-de-sac containing three residential properties and the rear access to an
additional residential property on Waterside Street. In total, the access for four
properties would be affected by the development. 
2.2 The approved site plan for the foodstore would result in alterations to the access to
Townhead Close so that it would be accessed through the car park of the foodstore
and therefore would be disconnected from the public road network. A Condition to the
Planning Permission requires that the applicant provides a detailed Parking
Management Plan including:
• details of maximum parking stay duration,
• specification of how parking duration would be monitored and enforced,
Agenda Item 4
16

Page 17

• the hours of operation of parking management,
• how vehicles of residents (and their visitors) of Townhead Close shall be
excluded from the parking management scheme,
• how customer parking will be prevented in Townhead Close,
• where staff will park, and
• suitable management arrangements to prevent non-customers from parking.
2.3 The Parking Management Plan, as required by the terms of the Condition, has not yet
been submitted, however, it is expected that the customer car park would be
controlled through APNR licence plate recognition of cars entering and leaving the car
park. The maximum stay would likely be 90 minutes. This scheme would apply during
the opening hours of the food store. Residents of Townhead Close would be able to
register to have their vehicles excluded from the scheme. Staff should not be
permitted to park on site and a Travel Plan would encourage the use of non-car
modes of travel. 
2.4 Given the above, the applicant has requested that Townhead Close be stopped up
under Sections 207 and 208 of The Town and County Planning (Scotland) Act 1997,
as amended (The Act) in order to allow the approved development to proceed. 
2.5. Section 207 of The Act states that a Planning Authority may by order authorise the
stopping up or diversion of any road which is not- 
(i) a trunk road within the meaning of the Roads (Scotland) Act 1984, or
(ii) A special road provided by the Secretary of State in pursuance of a scheme
under that Act, 
if they are satisfied that it is necessary to do so in order to enable the development to
be carried out in accordance with Planning Permission granted under Part III or
Section 242A, or by a government department. 
2.6   Section 208 provides similar powers in relation to footpaths and bridleways. 
2.7 For the avoidance of doubt, the stopping up of a road means that the road would no
longer be adopted or form part of the public road network. In this instance, the lower
section of Townhead Close would be removed and would be replaced by the car park
for the approved foodstore. The upper section would be retained as a private access,
accessible through the car park of the foodstore. 
2.8 The proposed Stopping Up Order would relate to the stopping up of Townhead Close
which is neither a trunk road within the meaning of the Roads (Scotland) Act 1984 nor
is it a special road provided by the Secretary of State in pursuance of a scheme under
that Act. The Stopping Up Order is necessary in order to enable the development to
be carried out in accordance with Planning Permission granted under Part III of the
Act (Planning ref. 21/01042/PP). 
2.9 The applicant has confirmed that on the grant of any Stopping Up Order, servitudes
would be granted to the proprietors affected by the Order in order to maintain access
to their properties. 
2.10    The process of carrying out a Stopping Up Order involves: 
17

Page 18

i. Notice of the proposed order is published in the Edinburgh Gazette and a local
newspaper, served on statutory undertakers and owners/occupiers of the land
involved and displayed at the road;
ii. There is a 28-day period for objections/representations;
iii. If there are no objections, the authority may confirm the order itself;
iv. If there are objections, the Order goes to the Scottish Ministers for confirmation
and an inquiry is generally required; and
v. Confirmation of the order must be advertised/notified in the same manner as
notice of the proposed order  
2.11 Should the committee approve the promotion of such an Order, the notification
process would be carried out shortly thereafter. 
3. Proposals 
3.1 It is therefore recommended that the Planning Committee approve the promotion of a
Stopping Up Order for Townhead Close. 
3.2    If no objections are received to the Stopping Up Order, in the interest of expediency, it
is recommended that the Order be confirmed under delegated powers by the Chief
Planning Officer. 
4. Implications/Socio-economic Duty 
Financial 
4.1 Under Section 207 of The Act, the Planning Authority can require any other authority
or person specified to makes payments, repayments, or contributions to the cost of
doing work associated with the Order. In this instance, the applicant would be
expected to pay the costs of the Stopping Up Order. 
Human Resources 
4.2 None 
Legal 
4.3 Should a Stopping Up Order for Townhead Close be confirmed, Townhead Close would
no longer be part of the adopted road network and therefore North Ayrshire Council
would no longer have a responsibility to maintain the road. The lower part of the road
would be incorporated into the car park for the foodstore and the upper section would
remain as a private access for the residential properties affected.  In order to preserve
access to the existing residential properties it is proposed that the Stopping Up Order
would not come into operation until the new access has been formed.  In addition, the
applicant has confirmed that formal rights of access would be granted to the proprietors
18

Page 19

affected by the Order in order to maintain access to their properties and that formation
and future maintenance of the new access road will be the responsibility of the
applicant. 
Equality/Socio-economic 
4.4 None 
Environmental and Sustainability 
4.5 None 
Key Priorities 
4.6 The proposed Stopping Up Order would facilitate a development proposal which aligns
with the Council Plan Key Priorities of ‘Inclusive, growing and enterprising local
economy’; ‘Effective infrastructure and digital connectivity’; ‘Vibrant, welcoming and
attractive places’; and ‘A sustainable environment’.   
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 None 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact John Mack, Planning Officer, on 01294 324794. 
Background Papers
Click here to enter text.
19

Page 20

659240N
659260N
659320N
220460E
220460E
220480E
220480E
220500E
220500E
220520E
Garage Workshop
Garage Workshop
Car Showroom
Former Public House & Nightclub
A78
Waterside Street
Office
Car Park
Hardware Store
Hardware Store
Hardware Store
121
117/ 119 Tenement
Flats
Store
3
6
7
Flats 7A-7J
Auction
House
28A
28
24
20
10-14
Frazer
Street
21-22
15-16
13-14
Car Park
Area of Road, Footpaths and
Footways to be stopped up
Denote onwership boundary
This is the plan referred to the foregoing The
North Ayrshire Council (Townhead Close,
Largs) Stopping Up Order 2022
Revision Notes
1m 5m
10m0m 3m
20m
SCALE BAR
Drawing Status
G1 Architects
3rd Floor West
211 Dumbarton Road
Glasgow G11 6AA
t    0141 334 4881
info@g1architects.com
www.g1architects.com
No Description Date
Project Drawing Title
Scale Drawn DateCheckedSize
A1
Drawing No
UPRN Originator Zone Level Type Role Number Revision
Suitability
NOTE
This drawing is the copyright of G1 Architects and the contents
shall not be reproduced or used for any other purpose without
their written permission. Do not use scaled dimensions from this
drawing. All dimensions are to be verified and checked on site by
the main contractor before the commencement of any work
whatsoever, either on his behalf or for subcontractors or suppliers.
Shop drawings to be presented to the architect for approval prior
to fabrication. All discrepancies are to be reported to the architect
immediately. Drawing to be read in conjunction with all other
architects, engineers and specialists drawings + specifications
If in doubt ASK
1 : 200
LEGAL
M&S Foodhall
Main Street
Largs
KA30 8JL
AW 01/07/22
Stopping Up Plan
RM
719-G1-SO-XX-DR-A-SP09-P2
1 Existing adopted road extents amended 10/10/22
2 Stopping Up Hatch Amended 19/10/22
20