Planning Committee
26 October 2022 
At a Meeting of the Planning Committee of North Ayrshire Council at 2.00 p.m. involving
a combination of participation by remote electronic means and physical attendance
within the Council Chambers, Irvine. 
Present (Physical Participation)
Robert Foster, Timothy Billings, Stewart Ferguson, Cameron Inglis and Davina
McTiernan. 
Present (Remote Participation)
Scott Davidson, Amanda Kerr and Jim Montgomerie. 
In Attendance (Physical Participation)
J. Miller, Chief Planning Officer and A Gemmell, Manager (Planning); R. Lynch, Senior
Manager, J. Niven, Solicitor (Legal Services), A. Little and D. McCaw, Committee
Services Officers (Chief Executive’s Service). 
Apologies
Ian Murdoch and Chloé Robertson. 
Chair
Councillor Foster in the Chair. 
1. Declarations of Interest 
There were no declarations of interest by Members in terms of Standing Order 11 and
Section 5 of the Code of Conduct for Councillors. 
2.   Minutes 
The Minute of the meeting of the Planning Committee held on 28 September 2022 was
confirmed and the Minute signed in accordance with Paragraph 7 (1) of Schedule 7 of
the Local Government (Scotland) Act 1973. 
3. 22/00595/PPM: DSM Nutritional Products UK Ltd, Drakemyre, Dalry 
DSM Nutritional Products UK Ltd have applied for planning permission for the erection
of a chemical production and distribution facility for the manufacture of an animal feed
additive within the site boundary of DSM Nutritional Products at Drakemyre, Dalry. 
The Committee was advised of a late objection from Scottish Gas Network (SGN) relating
to a gas pipeline in the vicinity of the proposed development.  The applicant had further
advised that there would be a corridor of 15m either side of the pipe, ensuring there would
be no encroachment on the pipeline and that consultation had taken place with SGN that
addressed any safety concerns.  It was noted that the development was located
approximately 30m from the pipeline.

Page 2

Discussion took place on the type, range and pitch of noise from the operation of the
proposed facility.  The Chief Planning Officer, advised that Condition 9 stated the
facility must not exceed the background noise level by 5dB or more at the curtilage of
any noise sensitive property.  He undertook to obtain further information from
Environmental Health and advise Councillor Billings accordingly.  It was noted that the
final design of the facility would examine this area in more detail. 
Councillor Inglis, seconded by Councillor McTiernan, moved that the application be
granted, subject to conditions.  There being no amendment, the motion was declared
carried. 
The Committee agreed to grant the application, subject to the following conditions:- 
1.  That the development hereby approved shall be implemented in accordance with
the submitted plans, drawings and recommendations contained in the application
(inclusive of the EIA Report and associated supporting documentation) unless
otherwise indicated below, all to the satisfaction of North Ayrshire Council as
Planning Authority. 
2.  That prior to the commencement of the development hereby approved, the
applicant shall submit a Construction Environmental Management Plan for the
written approval of North Ayrshire Council as Planning Authority, the scope and
content of which shall be informed by the EIA Report. Thereafter, the
development shall be implemented in accordance with such details as may be
approved to the satisfaction of North Ayrshire Council as Planning Authority. 
3.  That prior to the commencement of the development hereby approved, the
applicant shall agree the Remediation Method Statement contained within
Appendix 8-4 of the Environmental Impact Assessment Report with North
Ayrshire Council as Planning Authority. If there is a requirement to re-use site
won material and/or to import material, then the assessment criteria and
sampling frequency that would adequately demonstrate its suitability for use shall
be submitted to and approved by the Planning Authority prior to any material
being used. In addition to this, and in accordance with BS3882:2015 and
BS8601:2013, material to be used in the top 300mm shall be free from metals,
plastic, wood, glass, tarmac, paper and odours. On completion of the works and
at a time and or phasing to be agreed with the Planning Authority, the applicant
shall submit a verification report containing details of the source of the material
and appropriate test results to demonstrate its suitability for use. In addition, on
completion of the proposed works written verification, detailing what was done by
way of any remediation, shall also be submitted for the written approval of North
Ayrshire Council as Planning Authority.

Page 3

4.  That, for the avoidance of doubt, surface water arising from the development of
the site, including during construction operations, shall be treated and managed
using a SuDS system. Prior to the commencement of the development, hereby
approved, confirmation shall be submitted in writing to North Ayrshire Council as
Planning Authority and certified by a suitably qualified person that a scheme to
treat the surface water arising from the development of the site (during
construction and operational phases) has been prepared in accordance with the
principles and practices contained in 'The SuDS Manual' (CIRIA report C753,
published November 2015). Thereafter, the certified scheme shall be
implemented prior to the completion of the development and maintained
thereafter to the satisfaction of North Ayrshire Council as Planning Authority. 
5.  That the presence of any significant unsuspected contamination which becomes
evident during the development of the site shall be reported to North Ayrshire
Council and treated in accordance with an agreed remediation scheme. On
completion of the proposed works written verification, detailing what was done by
way of any remediation, shall also be submitted to the North Ayrshire Council as
Planning Authority. 
6.  That, notwithstanding the plans hereby approved, prior to the commencement of
any building operations, the applicant shall submit for the written approval of
North Ayrshire Council as Planning Authority a detailed schedule of the proposed
external finishes to be used (inclusive of colour scheme). Thereafter, the
development shall be implemented only in accordance with such details as may
be approved, unless otherwise agreed in writing with North Ayrshire Council as
Planning Authority. 
7.  That, prior to the commencement of any landscaping works, the applicant shall
submit for the written approval of North Ayrshire Council as Planning Authority a
finalised scheme of landscaping and woodland planting. The finalised scheme
shall be based on the Indicative Landscape Masterplan hereby approved and
shall include details of species, planting densities, soil treatment and aftercare.
Thereafter, the scheme as may be approved shall be implemented prior the
development becoming operational and retained thereafter to the satisfaction of
North Ayrshire Council as Planning Authority. 
8.  That the development shall be implemented to the satisfaction of North Ayrshire
Council as Planning Authority in accordance with the details set out in the
'Renewable and Low Carbon Technology Feasibility Study' prepared by
BakerHicks dated 18th July 2022, unless otherwise agreed in writing with North
Ayrshire Council as Planning Authority. 
9.  The rated noise level, as defined in BS4142:2014 + AL:2019, from the operation
of the proposed facility must not exceed the background noise level by 5dB or
more at the curtilage of any noise sensitive property.

Page 4

4. 22/00593/PP: 32 Eglinton Street, Beith 
Mr M Jawad, has applied for a change of use of vacant bank premises to a hot food
takeaway to include the erection of a ventilation flue to rear at 32 Eglinton Street,
Beith. Three representations were received and summarised in the report. 
Councillor Billings, seconded by Councillor Ferguson, moved that the application be
granted, subject to conditions.  There being no amendment, the motion was declared
carried. 
1. That prior to the commencement of the development hereby approved, full
details and drawings of the extraction system (including details of odour control
and noise/vibration reduction measures) shall be submitted and approved in
writing by North Ayrshire Council as Planning Authority. Details of the extraction
system will be accompanied by written certification from a member of the
Building & Engineering Services Association, or any other suitably qualified
person, confirming that the extraction system, as designed: 
-  can be affixed to the external wall without the need for approval by a third
party, or alternatively, evidence of such approval; 
- is suitable for use in a catering environment; 
- will provide a suitable rate of extraction above all cooking appliances; 
-  will sufficiently reduce or eliminate odours and efficiently extract products of
combustion, considering the nature of the business, will discharge to the
external air in a suitable area to prevent odours affecting the residents of
surrounding dwellings; and 
-  has incorporated any necessary noise/vibration reduction measures to
ensure operation of the system will not result in intrusive levels of noise
affecting the residents of adjoining and surrounding dwellings. 
Thereafter, the extraction system shall be fully installed as detailed in the
drawings and tested prior to the commencement of the operation, shall always
be in operation when cooking appliances are in use and shall be maintained to
the satisfaction of North Ayrshire Council as Planning Authority. 
2.  The rated noise level, as defined in BS4142, from the operation of
plant/equipment (extraction system and associated flues) shall not exceed the
background noise level by 5dB(A) or more at the curtilage of any noise sensitive
property in the vicinity of the site. 
3.  That the maximum operating hours of the hot food takeaway hereby approved
shall be between 1200 and 2100 hours on any day. The premises shall not
operate out with these hours without the prior written approval of North Ayrshire
Council as Planning Authority.

Page 5

5  22/00137/MSCM: West Byrehill Industrial Estate Byrehill Place, West
Byrehill, Kilwinning 
Persimmon Homes & Ashtenne Industrial Fund LLP have applied for approval of
matters specified in conditions of planning permission in principle ref. 20/00323/PPM
for a residential development comprising the erection of 426 dwellinghouses and
associated infrastructure at West Byrehill Industrial Estate, Byrehil Place, West
Byrehill, Kilwinning.  One representation was received and summarised in the report. 
The Committee was advised of continuing work by the Council’s consultants on the
impact of the development on the road network and their ongoing discussions with the
applicant’s traffic consultants.  In order to protect the safety and free flow of traffic on
the trunk road network near the site, it was considered that a condition was required to
restrict the scale of the development until all road network matters had been agreed. 
Condition 5, as set out in the report, would limit the development, to no more than 108
houses, until all road network matters had been concluded. 
The Committee noted that there was no commitment on the Council to contribute to
the road network improvement. 
Councillor Ferguson, seconded by Councillor Inglis, moved that the application be
granted, subject to conditions.  There being no amendment, the motion was declared
carried. 
1.  That the development hereby approved shall be implemented in accordance with
the details and recommendations contained in the submitted plans, drawings and
supporting documents, all to the satisfaction of North Ayrshire Council as
Planning Authority, unless otherwise agreed in writing. Prior to commencement,
the layout and the site plan shall be updated to show the works to form the flood
storage area including any designed flood flowpath between the open culvert and
the storage area, the details of which shall be agreed in writing before drainage
works commence. 
2.  That the development shall be implemented in accordance with the phasing plan
hereby approved unless otherwise agreed in writing by North Ayrshire Council as
Planning Authority. 
3.  That the landscaping and open space provision shall be provided on a phase-by-
phase basis. The implementation of the main area of open space to serve the
development shall be agreed in writing by North Ayrshire Council as Planning
Authority.

Page 6

4.  That all planting, seeding or turfing comprised in the approved details of
landscaping shall be carried out in the first planting season and seeding seasons
following the occupation of the buildings or the completion of the development,
whichever is the sooner; and any trees or plants which, within a period of five
years from planting die, are removed or become seriously damaged or diseased
shall be replaced in the next planting season with others of a similar size and
species, unless North Ayrshire Council as Planning Authority gives written
consent to any variation. 
5.  The development hereby approved shall commence in phases, and in
accordance with the following transport requirements, unless otherwise agreed in
writing by North Ayrshire Council as Planning Authority and in consultation with
Transport Scotland. For the avoidance of doubt, not more than 108 houses
constructed within the red line boundary shall be occupied until either: 
(i)  An updated transport assessment has been submitted to and approved by
the planning authority, in consultation with Transport Scotland, confirming
that additional development can be accommodated within the capacity of
the trunk road network; OR 
(ii)  An updated transport assessment has been submitted to and approved by
the planning authority, in consultation with Transport Scotland, confirming
that additional development can be accommodated within the capacity of
the trunk road network in the event of the implementation of appropriate
measures identified within the approved transport assessment; OR 
(iii)  The modifications to the A78(T)/A738(T) Pennyburn Roundabout, generally
as indicated in SIAS drawing number 75064-1 titled 'Pennyburn
Roundabout Signalisation - Revision 1', and the modifications to the
A738(T)/Pennyburn Road mini-roundabout and the A738(T) Whitehirst
Road signalised to form a roundabout junction generally as indicated in
SIAS drawing number 75064-5 titled Whitehirst Park Road have been
implemented; OR 
(iv)  North Ayrshire Council as Planning Authority Planning Authority or any
other party has concluded an appropriate legal agreement or agreements
for the funding and implementation of the works to mitigate the
development. 
6.  That, following the completion of the first phase of housing, the Energy Strategy
for the remainder of the development shall be updated for the written approval of
North Ayrshire Council as Planning Authority. The update shall reflect progress
made towards the options identified in the August 2022 version of the Strategy,
namely, centralised air source heat pumps or ground source heat pumps to
distribute heat to individual homes based on demand. Thereafter the updated
Energy Strategy as may be approved shall be implemented to the satisfaction of
North Ayrshire Council as Planning Authority.

Page 7

6  Development Plan Scheme - LDP3 
Submitted report by the Executive Director (Place) providing an update on the
preparation of the Council’s next Local Development Plan (LDP3) and seeking
approval of an updated Development Plan Scheme. The Development Plan Scheme,
was attached at Appendix 1 and set out the timetable for preparing and reviewing the
Local Development Plan. 
The Committee agreed to adopt the Development Plan Scheme as set out in
Appendix 1 to the report. 
The meeting ended at 2.55 p.m.