NORTH AYRSHIRE COUNCIL 
26th October 2022                                                                                                                                                            
Planning Committee 
Locality  Garnock Valley
Reference 22/00595/PPM
Application Registered 16th August 2022
Decision Due 16th December 2022
Ward Garnock Valley 
Recommendation  Approved subject to Conditions 
__________________________________________________________________ 
Location  DSM Nutritional Products UK Ltd Drakemyre Dalry
Ayrshire KA24 5JJ 
Applicant  DSM Nutritional Products (UK) Ltd Fao Mr Mark Dunn 
Proposal  Erection of chemical production and distribution facility
for the manufacture of an animal feed additive 
___________________________________________________________________ 
1. Description 
Planning permission is sought for the development of a production and distribution facility
on vacant brownfield land within the site boundary of DSM Nutritional Products at
Drakemyre, Dalry. The site, known as Area 18, is around 2.8 hectares in area, and is
bounded by a heat and power plant to the north, production buildings to the west, the
wastewater treatment plant to the south and undeveloped open ground to the east, beyond
which are other areas of plant. The level site has been used in the past for storage
purposes, as a contractor's compound and for fire training purposes. It is currently disused.
A further 1.3 hectares of land would be used for ancillary development, including a
temporary lagoon (to be removed upon completion of the development), landscaping and
pipe racks to existing installations. 
The proposed development involves the erection of an industrial facility to manufacture and
distribute a product called Bovaer, which is a cattle feed additive that has been formulated
by DSM over the past decade.  Bovaer reduces methane production in cattle and would be
sold on the world market. The product would result in lower carbon emissions from beef and
dairy farming when added to the diet of cattle and sheep. The product has been developed
in the Netherlands by DSM and is already manufactured in Germany. The company has

Page 2

chosen its Dalry factory as a further site for the manufacture of the product. Once complete,
the development would create around 30 additional jobs at the DSM site.  At its peak, the
3-year construction phase would support 350 management and construction jobs.   
The manufacturing process involves chemical synthesis during which an organic raw
material is mixed with a solvent and converted with acids to form the intermediate product in
a rapid exothermic reaction. In a second chemical synthesis, the intermediate product
reacts with an alkaline solution to yield the active substance of the final product. During both
stages, which would be continuous, residual acids and liquids are recycled for reuse in the
process. Both stages are carried out as closed operations. In the final stage, the active
substance is absorbed on silica powder to form the end product. The end product is then
added to bags which are then placed on wooden pallets for transfer to shipping containers.
The end product is dispatched in shipping containers by road hauliers.  Approximately 3
trucks per day would dispatch the finished product. The entire operation would be
continuous. Off-gases would be passed through a gas scrubber and send to thermal
treatment. Liquid effluents which cannot be recycled would also be sent for thermal
treatment in combination with natural gas. Organic and acid residues would be destroyed by
the thermal treatment. The heat which is produced would be recovered. Once the process is
complete, the residual off-gas would pass through a flue. Liquid effluents which do not
require thermal treatment would be sent to the existing wastewater treatment plant prior to
discharge to the public sewer. 
The development consists of the following main elements: 
Production Building
This would be the largest building proposed in the development, consisting of a 5-storey
building, almost 32m in height at its highest point with a single storey wing projecting to the
west.  The building would be L-shaped on plan, measuring 48.5m x 36.8m on the five-storey
wing and 37.7m x 23.1m on the other. 
The production building would contain the chemical synthesis and formulation processes
and the finished product distribution centre. Externally, the building would be clad in
composite metal panels finished primarily in white. Feature bands would be added to be
finished in dark grey, as would the glazing frames, doors and louvres. Feature glazing would
be provided on the western elevation. Solar PV panels would be installed on the roof. 
Control Room Building
This building would be square on plan with a footprint of 25m x 25m and a height of 10.4m.
External finishes would be white and grey. The building would house a lab, offices,
workshop, switch and plant rooms, control room and welfare facilities. Solar PV panels
would be installed on the roof. 
Off-gas and Liquid Effluent Treatment Plant
The footprint of the plant would extend to 25m x 15m. It would be sited to the east of the
production building. The plant would have a height of 15m and would consist of tanks,
pipework, pumps and other items. The proposed off-gas stack would rise above the plant
and would be 36.5m in height. The stack would be cylindrical in form with a narrow diameter.
The off-gas stack would be around 4.5m taller than the nearby production building. 
Tank Farms

Page 3

Two tank farms are proposed, west and south. Each tank farm would serve a different
purpose: one for liquid raw materials and intermediates storage; the other for acids.  West
would have footprint of 49m x 17.5m, with 14 tanks and a maximum height of approximately
10m. South would have a footprint of 20m x 8m and maximum height of approximately 10m.
The external colour would be grey. 
Reactor Building
This building would be 18m x 18.5m on plan with heights varying from 4.5m to 10m. External
finishes would be grey metal cladding.  The building would accommodate the plant room
and six chambers used for chemical synthesis. 
Transformer Building
The building to house the high voltage transformer, switch rooms and emergency diesel
generator would be 3.8m in height with a footprint of 19.4m x 5.3m. External colours would
also be grey cladding. 
Shut Off Tank
This concrete tank would be located to the south of the reactor building, measuring 8m x
10m. The tank would project just 1.2m above the ground level with 2.5m depth. The base
would be lined to prevent leaching into the soil. 
Ancillary development 
This would include:
- Unloading and loading stations
- An overhead pipe bridge between the production building and the existing services to
the north of the site
- Pipe bridges to connect the production building to the off-gas plant and the reactor
building
- A bin store beside the control room building.   
Ground surface treatments
The spaces between the buildings would be hard surfaced with concrete. The internal
access roads would be hard surfaced with asphalt, as would the footpaths around the
buildings. Pedestrian crossings would also be formed, and block paving laid to the area
around the control room building. Soft landscaping within Area 18 would be provided
adjacent to the control room building and to the east of the west tank farm. Three car parking
spaces would be provided within Area 18 (the existing car parking areas serving DSM would
be used for employees and visitors). 
Woodland planting
Substantial areas of structure tree planting would take place on land to the northeast and
southeast of Area 18. The area to the northeast of the main development area would
incorporate a feature mound which would raise the ground prior to trees being planted.
Further woodland planting would take place to the southwest of an existing woodland area
and infill tree planting would take place on the existing tree corridor alongside the Rye Water
to the east and southeast. The trees would be planted to create woodland areas for
screening purposes in the same way as a previous planting scheme (dating from the late
1990s) which was created to around the south of DSM's wastewater treatment facility. The
tree species within the proposed woodland areas have also been chosen to create new
habitats for wildlife, insects and birds.

Page 4

The application is classed as a major development in terms of The Town and Country
Planning (Hierarchy of Developments) (Scotland) Regulations 2009. Public pre-application
consultation (PAC) was required, and a proposal of application notice was received on 3rd
February 2022, giving details of publicity for a public event (details below). 
Due to the potential for significant environmental effects, proposals of this type are included
within Schedule 1 of the Town and Country Planning (Environmental Impact Assessment)
(Scotland) Regulations 2017. As such, the preparation of an EIA Report is a mandatory
requirement. Prior to the submission of the planning application, a Scoping Opinion was
requested by the applicant (ref. 22/00057/EIA) and issued by the Council on 23rd February
2022. 
The planning application is accompanied by an EIA Report which has been prepared
following the scoping exercise. In support of the application the following documents have
been submitted: 
Pre-application consultation (PAC) Report 
A Proposal of Application Notice was submitted to the Council on 3rd February 2022.
Publicity for the pre-application consultation period included direct notification to immediate
neighbours, the ward councillors, the constituency MP, constituency and list MSPs and the
local community council. An advert was published in the Ardrossan and Saltcoats Herald on
9th March 2022. 
A Virtual 'drop in' event was held between Monday 21st March 2022 and Sunday 10th April
2022. During the three week 'live' period there were 71 visits to the virtual consultation with
the busiest day being the 21st March 2022. Five feedback forms were completed and
submitted. A series of questions were asked by attendees and written answers provided.
Questions included topics such traffic routes and transportation times, odour, noise, impacts
on footpaths around the site and whether or not a community benefit scheme is envisaged.
The PAC report states that feedback received about the consultation event was generally
positive. 
Design and Access Statement 
The document appraises the site in terms of the proposed use of the site, amount of
development, layout, scale, landscape/topography, appearance and access. It explains that
the proposed layout would be as compact as possible, in order to minimise the amount of
land used, in a location that has a well-established industrial context beside existing
recycling facilities that would reduce traffic generation to and from the facility. The building
design aims to enclose and screen the functional requirements of the process using
external materials chosen to limit visual impact whilst having an obvious industrial
character, not dissimilar to many of the large buildings nearby, such as the paper mill and
GSK. 
EIA Report 
The EIA process involves identifying significant effects of proposed development on the
environment and considers ways to resolve or mitigate them. There are thirteen chapters in
the submitted EIA Report. It is structured in two parts: the first is descriptive (chapters 1 - 6),
the second is analytical (chapters 7 - 13). 
The following topics considered in depth within the second part of the EIA: 
- Air Quality;

Page 5

- Ground Condition;
- Landscape and Visual Impact;
- Noise and Vibration; and 
- Water Environment. 
(Note: Ecology and transport were scoped out of the EIA on the basis that there would be no
significant effects, although both topics are discussed in chapter 12) 
The EIA Report also includes a number of appendices which cover a range of topics such as
flooding and drainage. 
The EIA has helped to shape the siting and design of the proposed development. A key
component of EIA is to identify and recommend mitigation measures to address the
predicted impacts. These include pollution control measures at the plant (e.g. the control of
emissions) as well as external measures around the site (e.g. Landscaping and woodland
planting). In addition to addressing design impacts, a range of mitigation measures are
proposed for the three-year construction phase. These include, but are not limited to, a
Construction Environmental Management Plan, measures to control noise emissions/dust,
and pre-construction habitat surveys. For the operational phase a range of pollution control
measures have been identified. It should be noted that the regulation of pollution control for
DSM is primarily the responsibility of SEPA, rather than North Ayrshire Council. This would
remain the case in respect of the proposed development. 
Renewable and Low Carbon Technology Feasibility Study 
The report assesses the potential for compliance with LDP policies 29 and 31 and proposes
the systems and methods by which this will be achieved. 
The application site is located within a large industrial complex at Drakemyre on the
northern edge of Dalry. The factory was originally established during the 1950s by Roche
Products Ltd as a purpose-built location for the manufacture of pharmaceutical products
and vitamins.  The site underwent significant expansion during the late 1960s and the early
1980s, which included the development of a coal-fired power station and a rail connection to
the Glasgow - Ayr railway.  During the 1990s, a gas fired combined heat and power plant
was developed and operational by 1994. The coal fired power station building remains on
site, but coal has not been used at the site for many years. Also in the 1990s, a large
wastewater treatment facility was developed to provide improved effluent management
before discharging wastewater to the Garnock Valley sewer. The site consists of around 50
buildings and tanks of varying scale, many of which are relatively tall, with some being the
equivalent of a ten-storey block of flats. The highest structure on the site is the 1980s
powerhouse building, which is around 35 metres high (excluding the flue stack).  The flue
stack, the tallest structure on the DSM site, rises approximately 72 metres above ground
level and is a dominant feature in the surrounding landscape.   
The DSM site occupies a large parcel of land on the floor of the Garnock Valley, consisting
of flat, level ground at the northern edge of Dalry. It is situated to the north of Dalry Public
Park and south of the heavily wooded Pitcon Estate. The main built-up areas of the town are
to the south and west of the Public Park. To the east of the site are open fields, beyond
which is the River Garnock and Glasgow - Ayr railway line. To the east of the railway, the
ground rises steeply. To the west is the B780 (Drakemyre) which links Dalry to Kilbirnie,
beyond which the ground rises steeply into uplands. The rising ground to the west and east

Page 6

provides a degree of containment for the factory, although it is widely visible over long
distances due to the heights of the buildings, stacks and plant. 
DSM is a major employer within North Ayrshire and provides around 300 jobs directly.  The
site is also served by a number of sub-contractors which provide additional employment.
The main products which the site currently manufactures are Vitamin C,
Calcium-D-Pantothenate (vitamin B5) and Panthenol (proVitamin B5). 
Prior to the submission of the application, the applicant entered into a Processing
Agreement with the Council. 
In terms of the adopted Local Development Plan, the site is allocated for business and
industry. The following policies are applicable to the consideration of the proposal: 
Strategic Policy 1 - The Towns and Villages Objective 
Strategic Policy 2 - Placemaking 
Policy 7 - Business and Industry Employment Locations 
Policy 15 - Landscape and Seascape 
Policy 16 - Protection of our Designated Sites
Policy 18 - Forestry, Woodland, Trees and Hedgerows 
Policy 23 - Flood Risk Management 
Policy 29 - Energy Infrastructure Development 
Policy 31 - Future Proofing for Heat Networks 
Relevant Development Plan Policies 
SP1 - Towns and Villages Objective
Towns and Villages Objective 
Our towns and villages are where most of our homes, jobs, community facilities, shops and
services are located. We want to continue to support our communities, businesses and
protect our natural environment by directing new development to our towns and villages as
shown in the Spatial Strategy. Within urban areas (within the settlement boundary), the LDP
identifies town centre locations, employment locations and areas of open space. Most of the
remaining area within settlements is shown as General Urban Area. Within the General
Urban Area, proposals for residential development will accord with the development plan in
principle, and applications will be assessed against the policies of the LDP. New
non-residential proposals will be assessed against policies of this LDP that relate to the
proposal. 
In principle, we will support development proposals within our towns and villages that: 
a) Support the social and economic functions of our town centres by adopting a town
centre first principle that directs major new development and investment to town centre
locations as a priority including supporting town centre living.
b) Provide the right new homes in the right places by working alongside the Local
Housing Strategy to deliver choice and variety in the housing stock, protecting land for
housing development to ensure we address housing need and demand within North
Ayrshire and by supporting innovative approaches to improving the volume and speed of
housing delivery.

Page 7

c) Generate new employment opportunities by identifying a flexible range of business,
commercial and industrial areas to meet market demands including those that would
support key sector development at Hunterston and i3, Irvine.
d) Recognise the value of our built and natural environment by embedding placemaking
into our decision-making. 
e) Prioritise the re-use of brownfield land over greenfield land by supporting a range of
strategic developments that will deliver:
o regeneration of vacant and derelict land through its sustainable and productive
re-use, particularly at Ardrossan North Shore, harbour and marina areas, Montgomerie Park
(Irvine) and Lochshore (Kilbirnie).
o regeneration and conservation benefits, including securing the productive re-use of
Stoneyholm Mill (Kilbirnie) and supporting the Millport Conservation Area Regeneration
Scheme.
f) Support the delivery of regional partnerships such as the Ayrshire Growth Deal in
unlocking the economic potential of the Ayrshire region. 
Strategic Policy 2
Placemaking
Our Placemaking policy will ensure we are meeting LOIP priorities to make North Ayrshire
safer and healthier by ensuring that all development contributes to making quality places.
The policy also safeguards, and where possible enhances environmental quality through
the avoidance of unacceptable adverse environmental or amenity impacts. We expect that
all applications for planning permission meet the six qualities of successful places,
contained in this policy. This is in addition to establishing the principle of development in
accordance with Strategic Policy 1: Spatial Strategy. These detailed criteria are generally
not repeated in the detailed policies section of the LDP. They will apply, as appropriate, to all
developments. 
Six qualities of a successful place 
Distinctive
The proposal draws upon the positive characteristics of the surrounding area including
landscapes, topography, ecology, skylines, spaces and scales, street and building forms,
and materials to create places with a sense of identity. 
Welcoming
The proposal considers the future users of the site and helps people to find their way
around, for example, by accentuating existing landmarks to create or improve views
(including sea views), locating a distinctive work of art in a notable place or making the most
of gateway features to and from the development. It should also ensure that appropriate
signage and lighting is used to improve safety and illuminate attractive buildings.
Safe and Pleasant
The proposal creates attractive places by providing a sense of security, including by
encouraging activity, considering crime rates, providing a clear distinction between private
and public space, creating active frontages and considering the benefits of natural
surveillance for streets, paths and open spaces.
The proposal creates a pleasant, positive sense of place by promoting visual quality,
encouraging social and economic interaction and activity, and by considering the place
before vehicle movement.

Page 8

The proposal respects the amenity of existing and future users in terms of noise, privacy,
sunlight/daylight, smells, vibrations, glare, traffic generation, and parking. The proposal
sufficiently investigates and responds to any issues of ground instability. 
Adaptable
The proposal considers future users of the site and ensures that the design is adaptable to
their needs. This includes consideration of future changes of use that may involve a mix of
densities, tenures, and typologies to ensure that future diverse but compatible uses can be
integrated including the provision of versatile multi-functional greenspace. 
Resource Efficient
The proposal maximises the efficient use of resources. This can be achieved by re-using or
sharing existing resources and by minimising their future depletion. This includes
consideration of technological and natural means such as flood drainage systems, heat
networks, solar gain, renewable energy and waste recycling as well as use of green and
blue networks. 
Easy to Move Around and Beyond
The proposal considers the connectedness of the site for people before the movement of
motor vehicles, by prioritising sustainable and active travel choices, such as walking, cycling
and public transport and ensuring layouts reflect likely desire lines, through routes and
future expansions. 
Detailed Policy 7-B&I Employment Location
Policy 7: 
Business and Industry Employment Locations       
We will, in principle support and promote the development of the locations listed in schedule
5 for business and industry uses. In these locations other employment generating uses may
also be supported providing they would not undermine the marketability of the area for
business and industry uses. The following are some examples of other employment
generating uses that we will consider:
o General leisure and commercial leisure uses, where there is no sequentially
preferable location within town and edge of town centres or commercial centres
o Waste recycling and power generation (including renewables)
o Non-industrial uses that provide services and amenities for employees in business
locations, and that do not undermine the town centre strategy in the LDP (for example
nurseries), or the wider function of the industrial areas
o A range of other businesses that have difficulties in finding appropriate locations
For other employment generating uses, including outwith identified employment locations,
we will consider the resultant employment density of the proposed development, the impact
on the vitality and viability of the area's town centre network, in accordance with Policy 3
Town Centres and Retail, the effect on local transport infrastructure and potential
environmental impact.
We will seek to ensure that infrastructure provision at employment locations is exemplary
and will support development which includes superfast broadband provision, heat network
connection (or future-readiness), and low carbon technology integration (such as car
charging points).

Page 9

We will monitor the location, size, planning status, existing use, neighbouring land uses and
any significant land use issues (e.g. underused, vacant, derelict) within the business land
supply.
We will use the appropriate employment densities guide published by the U.K Government
to consider potential employment generating uses. 
Detailed Policy 15-Landscape & Seascape
Policy 15: 
Landscape and Seascape 
We will support development that protects and/or enhances our landscape/seascape
character, avoiding unacceptable adverse impacts on our designated and non-designated
landscape areas and features. In particular, we will consider the following: 
a) National Scenic Areas
Development that affects the North Arran National Scenic Area including the need to protect
existing sport and recreation interests, will only be supported where:
i) the objectives of the designation and the overall integrity of the area will not be
compromised; or
ii) any significant adverse effects on the qualities for which the area has been
designated are clearly outweighed by social, environmental or economic benefits of national
importance. 
b) Special Landscape Areas
We will only support development which affects Special Landscape Areas where it would
not have an unacceptable impact on their special character, qualities and setting. 
c) Wild Land
We will only support development within Wild Land areas where any significant effects on
the qualities of these areas can be substantially overcome by siting, design or other
mitigation. 
d) Local Landscape Features
Where appropriate, development should take into consideration its individual and
cumulative impacts on landscape features, including:
i) patterns of woodlands, fields, hedgerows and trees;
ii) lochs, ponds, watercourses, wetlands, the coast and wider seascape;
iii) settlement setting, including approaches to settlements;
iv) the setting of green network corridors, such as important transport routes and the
cycle and footpath network;
v) historic, natural and recreational features of interest, skylines and hill features,
including important views to, from and within them. 
For all development with the potential to have an impact on either Landscape Character or
Landscape features (including their setting), appropriate mitigation measures should be
considered as part of any planning application. Where there is potential for development to
result in significant adverse landscape/visual impact, a landscape and visual impact
assessment (LVIA) will be required. The Ayrshire Landscape Character Assessment (SNH,
1998) and North Ayrshire Settlement Development Strategy (Entec, 2008) provide further

Page 10

information on designations such as Local Landscape Character Areas and the Potential
Limit of Development Expansion areas as shown on the map on page 81 and on our online
proposals map. These landscape assessment documents, and any new or updated
landscape assessments, will be key considerations in determining whether development
proposals would be acceptable within the landscape. 
Detailed Policy 16- Protection of our
Policy 16: 
Protection of our Designated Sites 
We will support development which would not have an unacceptable adverse effect on our
valuable natural environment as defined by the following legislative and planning
designations; 
a) Nature Conservation Sites of International Importance
Where an assessment is unable to conclude that a development will not adversely affect the
integrity of a site, development will only be permitted where there are no alternative
solutions; there are imperative reasons of overriding public interest; and suitable
compensatory measures are provided to ensure that the overall coherence of the Natura
Network is protected. 
b) Nature Conservation Sites of National Importance
Development affecting Sites of Special Scientific Interest will not be permitted unless it can
be demonstrated that the overall objectives of the designation and the overall integrity of the
designated area would not be compromised, or any adverse effects are clearly outweighed
by social, environmental or economic benefits of national importance.
c) Nature Conservation Sites of Local Importance
Development adversely affecting Local Nature Reserves or Local Nature Conservation
Sites will generally not be permitted unless it can be demonstrated the overall objectives of
the designation and the overall integrity of the designated area would not be compromised,
or any adverse effects are clearly outweighed by social, environmental or economic benefits
of local importance. 
d) Marine Protected Areas
Development likely to have an adverse effect on the protected features of South Arran MPA
will not be supported. Proposals are also required to consult with the Clyde Marine Planning
Partnership (CMPP). 
e) Biodiversity Action Plan Habitats and Species
Development adversely affecting priority habitats or species set out in the North Ayrshire
Local Biodiversity Action Plan will not be permitted unless it can be demonstrated the
impacts are clearly outweighed by social or economic benefits of local importance.
f) Protected Species
Development likely to have an unacceptable adverse effect on;
i) European Protected Species (see Schedules 2 & 4 of the Habitats Regulations 1994
(as amended) for definition); Birds, Animals and Plants listed on Schedules 1, 5 and 8
(respectively) of the Wildlife and Countryside Act 1981 (as amended); or badgers, will only
be permitted where the applicant can demonstrate that a species licence is likely to be
granted.

Page 11

ii) The Scottish Biodiversity List (SBL) of animals, plants and habitats that Scottish
Ministers considered to be of principle importance for biodiversity conservation in Scotland. 
Detailed Policy 18 - Forestry, Woodland
Policy 18: 
Forestry, Woodland, Trees and Hedgerows 
Development proposals will only be supported when it would not result in the loss or
deterioration of an ancient or long- established plantation or semi-natural woodland unless
there are overriding public benefits from the development that outweigh the loss of the
woodland habitat. 
Where development includes the removal of woodland, the Scottish Government's Control
of Woodland Policy and the current Ayrshire and Arran Woodland Strategy including
relevant compensatory planting requirements will be taken into account. 
Where the loss of trees, hedgerows or woodlands of merit is unavoidable and compensatory
planting is required, replacement trees should be of a similar scale and massing to the loss
or if smaller there should be additional tree planting committed to ensure a net gain is
achieved. We will also expect developers to engage with Forestry Commission Scotland. 
We recognise that trees and woodlands are an important yet dynamic part of our landscape.
In recognition of this where a tree (or group of trees) is of significant value to public amenity
or where they strongly contribute to the character of a Conservation Area, we may consider
promoting a formal Tree Preservation Order (TPO). We will normally only do this when there
is a clear, pressing and immediate threat to a valuable tree (or group of trees) - not as a
matter of course and not in conflict with good arboricultural practice and management. In the
case of works to trees covered by a tree preservation order we will support management
schemes and maintenance works that adhere to good arboricultural practice. 
Generally, we will support proposals for dedicated timber export facilities as well as timber
export developments that are combined with other marine based activities on Arran where
there are no unacceptable adverse environmental impacts and align with our Placemaking
policy. Proposals should also align with Policy 28: Transport as an Economic Driver. 
Supplementary Guidance: Trees and Development provides guidance on information
required to be submitted as part of planning applications involving tree works as well as
matters to consider when designing and constructing development to minimise impacts on
trees. 
Detailed Policy 23-Flood Risk Management
Policy 23: 
Flood Risk Management 
We will support development that demonstrates accordance with the Flood Risk Framework
as defined in Scottish Planning Policy and shown in schedule 7, relevant flood risk
management strategies and local flood risk management plans. We will also support
schemes to manage flood risk, for instance through natural flood management, managed
coastal realignment, wetland or green infrastructure creation.

Page 12

Generally, development should avoid locations of flood risk and should not lead to a
significant increase in the flood risk elsewhere. Land raising and elevated buildings will only
be supported in exceptional circumstances, where it is shown to have a neutral or better
impact on flood risk outside the raised area. 
Development proposals should:
o Clearly set out measures to protect against, and manage, flood risk.
o Include sustainable urban drainage systems (SuDS) where surface water is
proposed to be discharged to the water environment, in accordance with the Water
Environment (Controlled Activities) (Scotland) Regulations 2011 as amended.
o Include provision of temporary/construction phase SuDS.
o include appropriate long-term maintenance arrangements.
o Be supported by an appropriate flood risk assessment where at risk of flooding from
any source in medium to high risk areas and for developments in low to medium risk areas
identified in the risk framework (schedule 7).
o Take account of SEPA's flood risk and land use vulnerability guidance (2018) and
any relevant updates to, or replacements of this guidance.   
Detailed Policy 29 - Energy Infrastructure
Policy 29: 
Energy Infrastructure Development 
We will support development proposals for energy infrastructure development, including
wind, solar, tidal, cropping and other renewable sources, where they will contribute
positively to our transition to a low carbon economy and have no unacceptable adverse
environmental impacts, taking into consideration (including cumulatively) the following: 
Environmental
o Communities and individual dwellings - including visual impact, residential amenity,
noise and shadow flicker;
o Water quality;
o Landscape - including avoiding unacceptable adverse impacts on our landscape
designations;
o Effects on the natural heritage - including birds;
o Carbon rich soils including peat;
o Impacts on the historic environment - including scheduled monuments, listed
buildings and their settings. 
Community
o Establishing the use of the site for energy infrastructure development;
o providing a net economic impact - including socio-economic benefits such as
employment, associated business and supply chain opportunities;
o Scale of contribution to renewable energy generation targets;
o Public access - including impact on long distance walking and cycling routes and
scenic routes identified in the National Planning Framework;
o Impacts on tourism and recreation;
o Specific locational opportunities for energy storage/generation.

Page 13

Public Safety
o Greenhouse gas emissions;
o Aviation and defence interests and seismological recording;
o Telecommunications and broadcasting installations - particularly ensuring that
transmission links are not compromised; radio telemetry interference and below ground
assets;
o Road traffic and adjacent trunk roads;
o Effects on hydrology, the water environment and flood risk including drinking water
quality and quantity (to both the public and private water supplies);
o Decommissioning of developments - including ancillary infrastructure, and site
restoration and aftercare. 
Proposals should include redundancy plans which will demonstrate how apparatus will be
timeously removed as reasonably soon as the approved scheme ceases operation. There
may be a requirement for financial bonds to ensure that decommissioning can be achieved.
Taking into consideration the above, proposals for wind turbine developments should
accord with the Spatial Framework (as mapped) and consider the current Landscape
Capacity Study for Wind Farm Development in North Ayrshire. This study will be used as a
point of reference for assessing all wind energy proposals including definitions of what small
to large scale entails. 
Buildings: Low and Zero Carbon Generating Technology 
Proposals for all new buildings will be required to demonstrate that at least 10% of the
current carbon emissions reduction set by Scottish Building Standards will be met through
the installation and operation of low and zero-carbon generating technologies. A statement
will be required to be submitted demonstrating compliance with this requirement. The
percentage will increase at the next review of the local development plan. 
This requirement will not apply to: 
1. Alterations and extensions to buildings 
2. Change of use or conversion of buildings 
3. Ancillary buildings that stand alone and cover an area less than 50 square metres 
4. Buildings which will not be heated or cooled, other than by heating provided solely for
frost protection. 
5. Buildings which have an intended life of less than two years. 
Detailed Policy 31 - Future Proofing for
Policy 31: 
Future Proofing for Heat Networks 
We will support proposals for the creation or enhancement of district heat networks in as
many locations as possible in North Ayrshire (even where they are initially reliant on
carbon-based fuels if there is potential to convert them to run on renewable or low carbon
sources of heat in the future).
We will seek to identify and safeguard existing and future heat network generation and
distribution infrastructure, including piperuns and pipework within, and to the curtilage of,
new developments.

Page 14

Proposals for development that constitute a significant heat source or substantial
development* which would not result in the creation or enhancement of district heat
networks should include: 
i) provision for on-site heat recovery and re-use infrastructure; or
ii) a heat network generation and distribution infrastructure plan (a district heating plan),
taking into account the potential to connect to future heat demand sites; or
iii) demonstrable evidence that district heating or other forms of renewable generation
storage have been explored but are not feasible for technical (proximity, geography, safety
etc) or economic reasons. 
* 'Substantial' developments consist of urban extensions, large regeneration areas or large
development sites subject to master planning or large mixed use developments and major
sites (50 residential units and above). There is, however, an element of judgment that will
need to be applied here and it might be that some other locations offer significant potential
for heat networks due to their local context, support from the local authority, and 'buy in' from
developers. 
2. Consultations and Representations 
Neighbour notification was carried out and the application was advertised in a local
newspaper and the Edinburgh Gazette in accordance with statutory procedures. No
representations have been received. 
Consultations 
Health & Safety Executive - no objection. 
Response: Noted. 
SEPA - No objections. This proposal constitutes a 'Least Vulnerable Use' within a built-up
area, on brownfield land. The proposal included a significant amount of land raising within
the site boundary. The site lies near to the River Garnock beside the functional floodplain
based on the SEPA Flood Maps. This indicates that there is a medium risk of flooding from
the River Garnock to the edges of the site. A Flood Risk Assessment (FRA) has been
submitted. It includes flood levels extracted from the North Ayrshire Council flood study for
the Upper Garnock Flood Protection Scheme. Additional information was requested and
submitted. Accordingly, SEPA has no objection on the grounds of flood risk following the
consideration of additional information supplied on 30th September 2022. 
The DSM Dalry site is currently subject to regulation under PPC Regulations as amended. It
operates under licence PPC/W/0020037. From the limited information provided to date,
SEPA consider the proposal to be potentially consentable. Accordingly, the SEPA Waste
and Industry Unit have no objection to the proposal. However, an application for variation to
the existing license will be required prior to operation of the proposed new activities. SEPA
strongly recommends that the applicant continues to liaise with the SEPA Waste and
Industry Unit to discuss the process design and the scope of any variation application.

Page 15

As defined in the PPC Regulations, the proposed chemical process represents a Chapter 4,
Section 4.1 process for the production of organic chemicals. Depending on its thermal
capacity, the proposed emergency generator may also represent a Chapter 1 Section 1.1
Part B (d) activity involving the burning of any fuel in a medium combustion plant with a rated
thermal input equal to or greater than 1 MW and less than or equal to 20MW. Full process
details have not been provided with the planning submission: in any PPC application
submitted, the applicant must demonstrate through detailed demonstration that the process
deploys Best Available Techniques (BAT) in all respects. 
The site is also an Upper Tier COMAH Establishment, and the new process will require to
be incorporated into the Establishment Safety Report in due course. This should be
discussed with the Joint Competent Authority for COMAH at the appropriate point.
Amendment to the site Hazardous Substances Consent is also required to accommodate
changes in the inventory of hazardous substances. 
A construction operation plan and method statement, or equivalent, will be required. This
will need to ensure the construction works are carried out with due regard to the relevant
Guidance for Pollution Prevention (GPPs) and the CIRIA publication C715. The applicant
will also need to ensure compliance with General Binding Rule 10 of The Water
Environment (Controlled Activities) (Scotland) Regulations 2011 (as amended) (CAR)
which requires, amongst other things, that all reasonable steps are taken to ensure that the
discharge of water run-off from a construction site does not result in pollution of the water
environment. 
Any waste materials imported to the site during construction must be stored and used only
in accordance with a waste management licence or exemption under the Waste
Management Licensing (Scotland) Regulations 2011. Similarly, any waste materials
removed from the site must be disposed of at a suitably licensed or exempt waste
management facility in accordance with these Regulations. 
The planning authority should be satisfied any subsequent impact on the surrounding road
network, and in particular, the cumulative impact of this development during construction
and the operational stage does not have the potential to lead to any future air quality issues. 
Response: Noted. This outcome follows an objection on flood risk grounds, due to a lack of
information about the flood protection scheme recently developed by North Ayrshire
Council, which has now been resolved to SEPA's satisfaction by letter dated 11th October
2022. As noted above, the operation of the plant would primarily be regulated by SEPA
under a PPC licence. However, conditions could be attached regarding the matters raised
by SEPA which fall within the remit of planning. There would be a need for an amended
hazardous substances consent, which the applicant is fully aware of, which would require
the submission of a further application prior to the proposed development becoming
operational. 
NAC Environmental Health - no objections to the development subject to a range of
recommendations and conditions, where appropriate, in relation to: noise levels from the
operation of the proposed development; the provision of further information in relation to the
Remediation Method Statement; the suitability of using site-won materials for groundworks;
the need to consider any unsuspected contamination found during excavation works; dust
controls and the need for ground water contours to determine flow direction.

Page 16

Response: Conditions could be attached where appropriate. A number of other matters
have been raised directly with the applicants by Environmental Health for their consideration
under other legislation. 
NAC Active Travel and Transport - no transport related objections to this proposal. An
existing access will be used for vehicles. An existing access will be re-opened for
construction vehicles. Operational access will be via the main gate off the B780. On Site
parking will be provided for employees and visitors. A Transport Statement has been
provided. 
Response: Noted. The site is located beside a bus route and is within walking/cycling
distance of Dalry Railway Station for staff. Raw materials and finished products would be
transported to/from the site by road, as at present. There is no opportunity, at present, to
re-use the railway connection into the site due to the nature of the product to be
manufactured and its distribution requirements. The railway connection would however be
retained. 
NAC Flooding Officer - no objections. Advice has been provided on a number of matters. 
Response: The applicant has taken account of the advice provided and a condition could be
attached with respect to the temporary and permanent SuDS arrangements. 
Scottish Water - no objection to the proposal. There is currently adequate capacity within
the public water and public sewers to serve the development. Surface water should be
treated using SuDS and will not be accepted to the sewer network via a combined sewer.
There may be limited exceptional circumstances where Scottish Water would allow a
surface water connection to a combined sewer (for brownfield sites only), however this will
require significant justification from the customer taking account of various factors including
legal, physical, and technical challenges. Records indicate that the development proposals
impact on existing Scottish Water assets. The applicant must identify any potential conflicts
with Scottish Water assets and contact the SW Asset Impact Team directly. 
Response: Noted. A condition could be attached with regards the proposed SuDS drainage
arrangements. An informative could be attached with respect to potential impacts on
Scottish Water assets. 
The Coal Authority - No objections. Records indicate that the site is likely to have been
subject to historic unrecorded underground shallow coal mining.  Voids and broken ground
associated with such workings can pose a risk of ground instability and may give rise to the
emission of mine gases.  The site also lies within a Surface Coal Resource Zone. 
The applicant has obtained appropriate and up-to-date coal mining information for the
proposed development site.  This information has been used to inform a Coal Mining Risk
Assessment (or equivalent) (July 2022, prepared by SLR Consulting Ltd) to accompany the
planning application.  SLR considers that coal mining and mine gas is not considered to
pose a risk to the proposed development and that the investigation works undertaken to
date in relation to coal mining provide sufficient evidence that site is minerally stable. 
It should be noted that where SuDS are proposed as part of the development scheme
consideration will need to be given to the implications of this in relation to the stability and

Page 17

public safety risks posed by coal mining legacy.  The developer should seek their own
advice from a technically competent person to ensure that a proper assessment has been
made of the potential interaction between hydrology, the proposed drainage system and
ground stability, including the implications this may have for any mine workings which may
be present beneath the site.       
The Coal Authority considers that the content and conclusions of the Mineral Risk
Assessment Report are sufficient for the purposes of the planning system and demonstrate
that the application site is, or can be made, safe and stable for the proposed development.
The Coal Authority therefore has no objection to the proposed development.  However,
additional more detailed considerations of ground conditions and/or foundation design may
be required as part of any subsequent building warrant application. 
Response: Noted.  A SuDS condition could be attached, which would address both the
construction phase and the operational phase of the proposed development. Further
technical information relating to ground conditions would be required at the building warrant
stage. 
NatureScot - have no comments on the proposal as it does not meet the criteria for
consultation. 
Response: Noted. 
Dalry Community Council, Ayrshire Rivers Trust, The Scottish Wildlife Trust. (Note:
the Ayrshire Rivers Trust and Scottish Wildlife Trust are not statutory consultees) - No
comments have been received. 
3. Analysis 
In accordance with statute, planning applications require to be determined in accordance
with the provisions of the development plan unless material considerations indicate
otherwise. 
As noted above, there are a number of relevant development plan policies which require to
be considered, the first of which is Strategic Policy 1 - The Towns and Villages Objective.
This strategic policy states that, in principle, the Council will support development proposals
within towns and villages which generate new employment opportunities, with priority given
to the re-use of brownfield land. As noted above, the proposed development has the
potential to generate around 30 additional jobs, once the plant is operational. 350 jobs
would be supported during the three-year construction phase. The site to be developed is
also brownfield land, having previously been used for purposes ancillary to the existing
industrial uses at DSM. The proposal is therefore considered to accord with Strategic Policy
1. 
The assessment of the proposal against Strategic Policy 2 - Placemaking will take place
after consideration of the detailed topic-based policies. 
Policy 7 - Business and Industry Employment Locations indicates that proposals for industry
is considered to be suitable land uses within the areas of North Ayrshire that have been

Page 18

identified in Schedule 5 of the LDP. The site is within the established industrial site at DSM
which is listed in the LDP as a business and industry employment location. Subject to
assessment against the other policies below, the proposal would therefore be acceptable in
terms of its location within an established industrial site. 
In terms of Policy 15 - Landscape and Seascape, the application is supported by a
comprehensive landscape and visual impact assessment, which considers the scale of the
development and its effects on the surrounding area. The landscape character type (LCT) of
the countryside near the site is defined in the Ayrshire Landscape Character Assessment
(1998) as part of the Broad Valley Lowland. 
The assessment notes the presence of existing industrial buildings and flue stacks nearby,
such as the CHP plant, power station, production buildings and tank farms to the north and
west. The development would take place within this long-established industrial context and
would not be out of keeping within this setting. Although the immediate surroundings (to the
east of the factory buildings) consist of flat, open ground, it is proposed to form a landscaped
mound to the northeast using excavated soil. The mound would then be planted with trees. 
Additional woodland planting areas are proposed around the edges of the site on much of
the open land, the effect of which would be to create enclosure which would screen and filter
views of the lower levels of the existing and proposed development from the surrounding
area. Over time, the planting scheme would reinforce existing woodland and strengthen the
landscaped buffer between the site and the wider countryside beyond the edge of Dalry.   
The proposal does not involve development within, nor close to, a national scenic area,
special landscape area, wild land area, local landscape feature, historic designed
landscape nor a conservation area. The nearest conservation area is within Dalry town
centre, which is around 1km to the southwest. There would be no adverse visual impacts on
the views to or from the conservation area arising from the proposed development, nor
would the setting of the conservation area be affected. 
In summary, the response to the landscape and visual impacts of the proposed
development is considered to be acceptable in terms of Policy 15. 
With respect to Policy 16, which relates to the protection of designated wildlife and nature
conservation sites, the application includes survey information and an appraisal of wildlife
and habitats around the site. The appraisal identified the potential for a number of protected
species within the survey area. None were within the area to be developed, but several
habitats were located in the surrounding area. Subject to the implementation of the
measures identified in the EIA Report, it is considered that the proposed development would
be acceptable in terms of Policy 16. 
Policy 18 relates to Forestry, Woodland, Trees and Hedgerows. The proposals do not
involve the clearance of any woodland. As noted elsewhere in the report, substantial areas
of new woodland planting are proposed around the site and within the DSM boundary.  This
would add significantly to the existing woodland in the vicinity and would have a positive
environmental and amenity impact. The woodland areas would be managed by DSM. The
proposal would therefore be acceptable in terms of Policy 18. 
Policy 23 relates to Flood Risk Management. As noted above, the proposal is supported by
a Flood Risk and Drainage Assessment and would feature a SuDS detention basin for the
management and treatment of surface water. Foul water would be treated at the existing

Page 19

wastewater treatment plant then drained to the public sewer. SEPA has no objection to the
application, and neither does Scottish Water. The proposal is therefore acceptable in
respect of Policy 23. 
Policy 29 addresses the topic of Energy Infrastructure Development and highlights the
Council's support for proposals which would contribute positively to our transition to a low
carbon economy. As noted above, the applicant has submitted a report entitled 'Renewable
and Low Carbon Technology Feasibility Study'. The report states that compliance with
Policy 29 has been demonstrated using Air Source Heat Pumps (ASHP) and Photovoltaics
(PV) to prove that 10% of the current carbon emissions reduction set by Scottish Building
Standards will be met through the installation and operation of low and zero-carbon
generating technologies. This is only measured against the Section 6 areas - the remaining
area for the Production Building will be served by waste heat recovery which complies with
Planning Policy 31 for the site as detailed in the feasibility study. In the above ways, the
development would contribute to the requirements of Policy 29. 
Turning to Policy 31 - Future Proofing for Heat Networks, the submitted report states that
compliance is demonstrated through the proposed installation of a new off-gas unit, which
would provide waste heat to serve the main Production Building areas.  The waste heat
would generate 110kW of peak load to satisfy 89% of the annual demand required for the
Production Building. The remaining demand would be met be the existing on-site wide
district heating system (which is generated by the gas fired combined heat and power plant).
The proposed development would therefore accord with Policy 31. 
Finally, turning to Strategic Policy 2 - Placemaking, the proposal has been assessed in
terms of the relevant criteria as follows: 
Distinctive
In terms of distinctiveness, the proposed development would be viewed within the context of
an established industrial site which contains a large number of buildings and structures of
varying heights, sizes and designs.  It is considered that the main building proposed, the
production building, would be the most distinctive and dominant element of the
development.  The production building would feature a more contemporary design in
comparison with the older buildings on the site. The design is considered acceptable. A
condition could be attached to require the submission of a final selection of external finishing
materials and colours to ensure compatibility with the existing buildings on the site. 
Safe and Pleasant
This quality requires consideration to be given to amenity impacts such as noise, smells,
vibrations, traffic generation, parking and ground instability.  As discussed above, the above
matters have been studied in detail within the EIA Report. Based on the information
provided, it is not considered that the proposed development would result in adverse
effects, since mitigation measures have been proposed to address them. These measures
would be implemented as part of the development.  A condition could be attached to ensure
the development is implemented in accordance with the recommendations of the EIA
Report and supporting information. Conditions have been recommended by consultees in
respect of a number of other matters, such as noise limits. As noted above, significant
woodland planting is to take place which would enhance the setting of the site and screen
much of the lower levels of the development, especially in respect of the proposed tanks
and pipework.  This would be of benefit to the local landscape character. Views from the

Page 20

public footpath which follows the edge of the DSM site would benefit from the woodland
planting scheme. 
Resource Efficient
It is considered that the development would be resource efficient through the use of
sustainable heat and power systems, recovery of energy from waste products/materials and
the recycling of residual acids and liquids during the production process. 
Easy to Move Around and Beyond
Based on the submitted information and consultation response from NAC Active Travel &
Transportation, the additional traffic generated by the proposed development is not
considered significant.  The existing access arrangements would remain as at present, with
traffic arriving and departing via the existing factory gate on the B780. Traffic can either
travel to the A737 trunk road at Manrahead Roundabout via Kilbirnie/Glengarnock or
through Dalry to join the A737 at the Hillend Roundabout south of the town. There are
existing footways on the B780 providing access to bus stops, residential areas, Dalry town
centre and the railway station (all within walking distance of the site). Finally, there is
adequate car parking provision within the DSM site. 
Adaptable
The development has not been designed to be adaptable, as it has been specially designed
as a bespoke production facility with specialist plant and machinery. However, the
development would re-use previously developed land within a long-established industrial
site in productive manner. 
In conclusion, the application is considered to accord with the LDP. The applicant estimates
that the development would generate around 350 construction/management jobs over a
three-year period and around 30 permanent jobs once the development is operational.
Landscape, visual and other significant environmental effects have been identified and
would be addressed as part of the development. Accordingly, the application should be
approved subject to the conditions as set out below.4. Full Recommendation 
Approved subject to Conditions 
Reasons for Decision 
Condition 
1. That the development hereby approved shall be implemented in accordance with the
submitted plans, drawings and recommendations contained in the application (inclusive of
the EIA Report and associated supporting documentation) unless otherwise indicated
below, all to the satisfaction of North Ayrshire Council as Planning Authority. 
Reason 
To secure the implementation of the development in accordance with the supporting
information. 
Condition 
2. That prior to the commencement of the development hereby approved, the applicant
shall submit a Construction Environmental Management Plan for the written approval of
North Ayrshire Council as Planning Authority, the scope and content of which shall be

Page 21

informed by the EIA Report.  Thereafter, the development shall be implemented in
accordance with such details as may be approved to the satisfaction of North Ayrshire
Council as Planning Authority. 
Reason 
To implement a recommendation contained in the EIA Report in the interests of
environmental protection during the construction phase. 
Condition 
3. That prior to the commencement of the development hereby approved, the applicant
shall agree the Remediation Method Statement contained within Appendix 8-4 of the
Environmental Impact Assessment Report with North Ayrshire Council as Planning
Authority. If there is a requirement to re-use site won material and/or to import material, then
the assessment criteria and sampling frequency that would adequately demonstrate its
suitability for use shall be submitted to and approved by the Planning Authority prior to any
material being used. In addition to this, and in accordance with BS3882:2015 and
BS8601:2013, material to be used in the top 300mm shall be free from metals, plastic,
wood, glass, tarmac, paper and odours. On completion of the works and at a time and or
phasing to be agreed with the Planning Authority, the applicant shall submit a verification
report containing details of the source of the material and appropriate test results to
demonstrate its suitability for use. In addition, on completion of the proposed works written
verification, detailing what was done by way of any remediation, shall also be submitted for
the written approval of North Ayrshire Council as Planning Authority. 
Reason 
In the interests of environmental protection. 
Condition 
4. That, for the avoidance of doubt, surface water arising from the development of the
site, including during construction operations, shall be treated and managed using a SuDS
system. Prior to the commencement of the development, hereby approved, confirmation
shall be submitted in writing to North Ayrshire Council as Planning Authority and certified by
a suitably qualified person that a scheme to treat the surface water arising from the
development of the site (during construction and operational phases) has been prepared in
accordance with the principles and practices contained in 'The SuDS Manual' (CIRIA report
C753, published November 2015). Thereafter, the certified scheme shall be implemented
prior to the completion of the development and maintained thereafter to the satisfaction of
North Ayrshire Council as Planning Authority. 
Reason 
In the interests of securing sustainable drainage for the development to safeguard
the water environment. 
Condition 
5. That the presence of any significant unsuspected contamination which becomes
evident during the development of the site shall be reported to North Ayrshire Council and
treated in accordance with an agreed remediation scheme. On completion of the proposed
works written verification, detailing what was done by way of any remediation, shall also be
submitted to the North Ayrshire Council as Planning Authority. 
Reason

Page 22

In the interests of environmental protection. 
Condition 
6. That, notwithstanding the plans hereby approved, prior to the commencement of any
building operations, the applicant shall submit for the written approval of North Ayrshire
Council as Planning Authority a detailed schedule of the proposed external finishes to be
used (inclusive of colour scheme). Thereafter, the development shall be implemented only
in accordance with such details as may be approved, unless otherwise agreed in writing
with North Ayrshire Council as Planning Authority. 
Reason 
To mitigate landscape and visual impacts and in the interests of amenity. 
Condition 
7. That, prior to the commencement of any landscaping works, the applicant shall
submit for the written approval of North Ayrshire Council as Planning Authority a finalised
scheme of landscaping and woodland planting. The finalised scheme shall be based on the
Indicative Landscape Masterplan hereby approved and shall include details of species,
planting densities, soil treatment and aftercare. Thereafter, the scheme as may be approved
shall be implemented prior the development becoming operational and retained thereafter
to the satisfaction of North Ayrshire Council as Planning Authority. 
Reason 
To mitigate landscape and visual impacts and in the interests of amenity, biodiversity
and habitat creation. 
Condition 
8. That the development shall be implemented to the satisfaction of North Ayrshire
Council as Planning Authority in accordance with the details set out in the 'Renewable and
Low Carbon Technology Feasibility Study' prepared by BakerHicks dated 18th July 2022,
unless otherwise agreed in writing with North Ayrshire Council as Planning Authority. 
Reason 
To ensure that the development accords with policies 29 and 31 of the adopted Local
Development Plan in the interests of reducing carbon emissions. 
Condition 
9. The rated noise level, as defined in BS4142:2014 + AL:2019, from the operation of
the proposed facility must not exceed the background noise level by 5dB or more at the
curtilage of any noise sensitive property. 
Reason 
To safeguard the amenity of noise sensitive properties within the vicinity of the site. 
James Miller 
Chief Planning Officer

Page 23

For further information please contact Mr A Hume Planning Officer on 01294 324318.

Page 24

Appendix 1 – Location Plan           
DO NOT SCALE Reproduced from the Ordnance Survey mapping with the permission of the Controller of Her Majesty’s Stationery
Office © Crown Copyright.  Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings.
North Ayrshire Council Licence Number 100023393.