Democracy Spraffa

Agenda Document Pack - Planning Committee - 28/09/2022

North Ayrshire Council · 28 September 2022
Back to Planning Committee — 28 September 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE         
Planning Committee 
A Meeting of the Planning Committee of North Ayrshire Council will be held in the
Council Chambers, Ground Floor, Cunninghame House, Irvine, KA12 8EE on
Wednesday, 28 September 2022 at 14:00 to consider the undernoted business. 
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with
provision, by prior notification, for remote attendance by Elected
Members in accordance with the provisions of the Local Government
(Scotland) Act 2003.  Where possible, the meeting will be live-streamed
and available to view at https://north-ayrshire.public-
i.tv/core/portal/home.   
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda. 
2 Minutes
The accuracy of the minutes of meetings of the Planning Committee held
on 24 August 2022 will be confirmed and the Minutes signed in
accordance with Paragraph 7 (1) of Schedule 7 of the Local Government
(Scotland) Act 1973 (copy enclosed). 
3 22/00420/PPM: Site To North Of St Andrews Court, Saltcoats
Erection of 99 dwelling houses 
4 Provisional Tree Preservation Order: Grouping of Trees adjacent to
Wildcat Road and Summerlea Road, West Kilbride
To seek authority to serve a Provisional Tree Preservation Order to
protect a group of trees at Wildcat Road and Summerlea Road, West
Kilbride
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
5 Notice under Section 179 of the Town and Country Planning
(Scotland) Act 1997: former dental surgery, Fergushill Road,
Kilwinning
To seek authority to serve a notice under Section 179 of the
Town and Country Planning (Scotland) Act 1997 to both secure the
building and to maintain the curtilage of the former dental surgery building
on Fergushill Road, Kilwinning. 
6 Urgent Items
Any other items which the Chair considers to be urgent.  
Webcasting
Please note: this meeting may be filmed/recorded/live-streamed to the
Council's internet site and available to view at https://north-ayrshire.public-
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live-streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.
Generally, the press and public seating areas will not be filmed. However,
by entering the Council Chambers, using the press or public seating area
or (by invitation) participating remotely in this meeting, you are consenting
to being filmed and consenting to the use and storage of those images and
sound recordings and any information pertaining to you contained in them
for webcasting or training purposes and for the purpose of keeping
historical records and making those records available to the public. If you
do not wish to participate in a recording, you should leave the
meeting.  This will constitute your revocation of consent.
If you have any queries regarding this and, in particular, if you believe that
use and/or storage of any particular information would cause, or be likely
to cause, substantial damage or distress to any individual, please contact
dataprotectionofficer@north-ayrshire.gov.uk. 
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE  
Planning Committee Sederunt 
Robert Foster (Chair)
Timothy Billings (Vice-Chair)
Scott Davidson
Stewart Ferguson
Cameron Inglis
Amanda Kerr
Davina McTiernan
Jim Montgomerie
Ian Murdoch
Chloe Robertson 
Chair: 
Apologies: 
Attending: 
3

Page 4

Planning Committee
24 August 2022 
Irvine, 24 August 2022 - At a Meeting of the Planning Committee of North Ayrshire
Council at 2.00 p.m. involving a combination of participation by remote electronic means
and physical attendance within the Council Chambers, Irvine 
Present (Physical Participation)
Robert Foster, Timothy Billings, Scott Davidson, Stewart Ferguson, Amanda Kerr,
Davina McTiernan and Chloé Robertson. 
Present (Remote Participation)
Jim Montgomerie. 
In Attendance
J. Miller, Chief Planning Officer (Planning); R. Lynch, Senior Manager and J. Niven,
Solicitor (Legal Services) and A. Little and H. Clancy, Committee Services Officers
(Chief Executive’s Service). 
Apologies
Cameron Inglis and Ian Murdoch. 
Chair
Councillor Foster in the Chair. 
1. Declarations of Interest 
There were no declarations of interest by Members in terms of Standing Order 11 and
Section 5 of the Code of Conduct for Councillors. 
2.   Minutes 
The Minutes of the meetings of the Ordinary Meeting of the Planning Committee held
on 8 and the Special Meeting on 29 June 2022 were confirmed and the Minutes signed
in accordance with Paragraph 7 (1) of Schedule 7 of the Local Government (Scotland)
Act 1973. 
3. 22/00094/PPM: 1 - 5 Crompton Way, North Newmoor, Irvine 
Manse Irvine LLP, have applied for planning permission for the erection of 60
dwellinghouses including the formation of access roads, open space, landscaping and
ancillary works at 1-5 Crompton Way, North Newmoor, Irvine.  One letter of objection
was received and summarised in the report. 
Councillor Davidson, seconded by Councillor Robertson, moved that the application
be granted, subject to conditions, including a condition requiring all houses with
vehicular parking to the rear to be provided with a direct means of access from their
allocated parking space to their rear door. 
Agenda Item 2
4

Page 5

As an amendment, Councillor Billings, seconded by Councillor McTiernan moved that
the application be refused in terms of Strategic Policy 2 in that the design did not
provide reasonable private outside space for a number of the proposed houses. 
On a division and a roll call vote, there voted for the amendment Councillors Billings
Ferguson and McTiernan (3) and for the motion, Councillors Foster, Davidson, Kerr,
Montgomerie and Robertson (5), and the motion was declared carried.   
Accordingly, the Committee agreed to grant the application, subject to the following
conditions:- 
1.  That prior to the commencement of the development hereby approved, the
developer shall provide full details of the proposed finishing materials for the
written approval of North Ayrshire Council as Planning Authority. Thereafter, the
development shall progress in accordance with such details as may be
approved. 
2.  That prior to the commencement of the development hereby approved, the
developer shall provide full details of the proposed boundary treatments for the
written approval of North Ayrshire Council as Planning Authority. For the
avoidance of doubt, all houses with vehicular parking to the rear shall be
provided with a direct means of access from their allocated parking space to their
rear door. Thereafter, the development shall progress in accordance with such
details as may be approved. 
3.  That no development shall take place until there has been submitted to and
approved by North Ayrshire Council as Planning Authority a scheme of
landscaping, which shall include details of species, planting densities, soil
treatment and aftercare and shall include indications of all existing trees and
hedgerows on the land and details of any to be retained together with measures
for their protection in the course of the development. 
4.  That all planting, seeding or turfing comprised in the approved details of
landscaping shall be carried out in the first planting season and seeding seasons
following the occupation of the buildings or the completion of the development,
whichever is the sooner; and any trees or plants which, within a period of five
years from the completion of the development die, are removed or become
seriously damaged or diseased shall be replaced in the next planting season with
others of a similar size and species, unless North Ayrshire Council as Planning
Authority gives written consent to any variation. 
5.  That prior to the commencement of the development, hereby approved, full
details of the site's surface water drainage system, including the discharge rate,
basin capacity, other temporary storage capacity, water quality treatment
measures and post development flood flow paths shall be submitted for the
agreement of North Ayrshire Council as Planning Authority. Thereafter the
agreed details shall be implemented prior to the completion of the development
and maintained thereafter to the satisfaction of North Ayrshire Council as
Planning Authority. 
5

Page 6

6.  That, prior to the commencement of the development, hereby approved,
confirmation shall be submitted in writing to North Ayrshire Council as Planning
Authority and certified by a suitably qualified person that a surface water
drainage system to manage and treat runoff at the site has been prepared in
accordance with the principles and practices contained in 'The SuDS Manual'
(CIRIA report C753, published November 2015). Thereafter, the certified scheme
shall be implemented prior to the completion of the development and maintained
thereafter to the satisfaction of North Ayrshire Council as Planning Authority. 
7.  That prior to the commencement of the development hereby approved, the
developer shall provide full details of the low and zero carbon generating
technologies to be used in the development for the written approval of North
Ayrshire Council as Planning Authority. For the avoidance of doubt, at least 10%
of the current carbon emission reduction targets set by Scottish Building
Standards shall be met through the use of low or zero carbon generating
technologies. Thereafter, the development shall progress in accordance with
such details as may be approved. 
8.  That prior to the commencement of the development hereby approved, the
developer shall provide full details of the proposed acoustic barrier to be erected
between the development and the Amer Sports warehouse for the written
approval of North Ayrshire Council as Planning Authority. Thereafter, the barrier
shall be erected in accordance with such details as may be approved prior to the
first occupation of the development and maintained in perpetuity unless
otherwise agreed in writing by North Ayrshire Council as Planning Authority. 
9.  The internal noise level from road traffic during daytime hours (0700-2300 hours)
in any habitable room within any residential property to which this consent relates
must not exceed LAeq 16-hour 35dB. In addition, the internal noise level from
road traffic during night hours (2300-0700 hours) in any habitable room within
any residential property to which this consent relates must not exceed LAeq 8-
hour 30dB. If these levels cannot be achieved with an open window strategy,
then alternative means of ventilation will require to be provided. 
10.  The rated noise level, as defined in BS4142, from any existing or consented
commercial undertakings at the time of consent (excluding noise from fixed plant
or equipment during night hours), must not exceed the background noise level by
5dB(A) or more at the curtilage of any of the proposed dwelling houses. For the
avoidance of doubt, there will be no onus on any existing or consented legitimate
commercial undertaking to modify, amend or curtail their existing procedures or
working arrangements and responsibility for ensuring any occupier of any of the
consented dwellings is not subjected to a statutory noise or dust nuisance in
terms of Section 79 of the Environmental Protection Act 1990 rests with the
developer as the "agent of change". 
11.  During night hours (2300-0700 hours) the noise from fixed plant and equipment
associated with existing or consented commercial undertakings must not exceed
the levels specified in NR 25 as detailed in BS8233 in any habitable room within
any residential property to which this consent relates. Compliance with this
condition must be met with windows open in a typical manner for ventilation. For
6

Page 7

the avoidance of doubt, there will be no onus on any existing or consented
legitimate commercial undertaking to modify, amend or curtail their existing
procedures or working arrangements and responsibility for ensuring any occupier
of any of the consented dwellings is not subjected to a statutory noise or dust
nuisance in terms of Section 79 of the Environmental Protection Act 1990 rests
with the developer as the "agent of change". 
12.  That prior to the commencement of the development, the applicants shall finalise
the ground investigation report submitted in support of the application by JPB
Reference Number VG190-18/SAG/MAK Draft Issue and dated December 2021
and submit a Remediation Strategy. All documentation shall be verified by a
suitably qualified Environmental Consultant and submitted to the satisfaction of
North Ayrshire Council as Planning Authority. On completion of the proposed
works written verification, detailing what was done by way of any remediation,
shall also be submitted. 
13.  That the presence of any significant unsuspected contamination that becomes
evident during the development of the site shall be brought to the attention of
North Ayrshire Council Environmental Health. Thereafter a suitable investigation
strategy as agreed with North Ayrshire Council shall be implemented and any
necessary remediation works carried out prior to any further development taking
place on the site, all to the satisfaction of North Ayrshire Council as Planning
Authority. 
14.  The applicant must demonstrate that the increased road traffic, generated as a
result of this development, shall not have a detrimental effect on the local air
quality or result in an increase in concentrations of atmospheric pollutants such
that statutory Air Quality Objectives would be exceeded at any location of
relevant public exposure. 
4. 22/00135/PPPM:  Site To North East, South East, And East Of Nethermill
59 Knoxville Road, Kilbirnie 
Chatham House Equities Limited, have applied for planning permission in principle for
a residential development of 62 houses to include the upgrading of Knoxville Road,
the provision of open space, SuDS infrastructure and realignment of cycle path (NCN
7) at the site to the north east, south east, and east of Nethermill, 59 Knoxville Road,
Kilbirnie.  Seven letters of objection and one letter of support were received and
summarised in the report. 
Councillor Robertson, seconded by Councillor McTiernan, moved that the application
be granted, subject to conditions.  There being no amendment, the motion was
declared carried. 
The Committee agreed to grant the application, subject to the following conditions:- 
1.  That prior to the commencement of the development hereby approved, full
details of the development shall be provided via either a Matters Specified in
Condition Application or a full Planning Application for the approval of North
7

Page 8

Ayrshire Council as Planning Authority. Such an application shall include details
of: 
(i) Layout, house number, house types, siting and design, 
(ii) Landscaping and boundary treatments, 
(iii) Access, road layout and parking, 
(iv) Drainage and flood prevention, and 
(v) Low and zero carbon generating technologies 
2.  That any application(s) submitted under Condition 1 shall include details of the
condition of the existing water wheel and, if feasible, plans provided for its
retention/salvage and incorporation into the proposed housing development as a
piece of public art or heritage feature. 
3.  That the road layout for any future Matters Specified in Condition Application or
full Planning Application shall accord with the requirements of 'Designing
Streets'. A Transport Statement shall be submitted in support of any future
application. Full details of the upgrading works to Knoxville Road and the
realignment of the NCN7 core path shall be provided and approved in writing by
North Ayrshire Council as Planning Authority prior to the commencement of the
development. 
4.  That any application(s) submitted under Condition 1 shall include a detailed flood
risk assessment shall be submitted for the written approval of North Ayrshire
Council as Planning Authority, which details a suitable culvert design and route,
without 90-degree bends supported by catchment flow information and blockage
scenarios for the 0.5% AEP flood event which demonstrates that the final drain
route and design will not pose a flood risk to proposed and existing development.
For the avoidance of doubt no buildings can be located on top of the culvert
route. 
5.  That any application(s) submitted under Condition 1 shall include, full details of
any modification of the existing Mill Lade within the site is submitted for the
agreement of North Ayrshire Council as Planning Authority. Thereafter the
agreed details shall be implemented prior to the completion of the development
and maintained thereafter to the satisfaction of North Ayrshire Council as
Planning Authority. 
6.  That any application(s) submitted under Condition1 shall include confirmation in
writing and certified by a suitably qualified person that a surface water drainage
system to manage and treat runoff affecting the site has been prepared in
accordance with the principles and practices contained in 'The SuDS Manual'
(CIRIA report C753, published November 2015). Thereafter, the certified scheme
shall be implemented prior to the completion of the development and maintained
thereafter to the satisfaction of North Ayrshire Council as Planning Authority. 
7.  That any application(s) submitted under Condition 1 shall include full details of
the ground levels and finished floor levels of the proposed dwellinghouses shall
be submitted for the agreement of North Ayrshire Council as Planning Authority.
The details shall demonstrate that the proposed dwellings are not at risk of
8

Page 9

surface water flooding when the capacity of the proposed surface water
infrastructure is exceeded during the 1 in 200 year designed storm event (plus
allowances for climate change and urban creep). Thereafter the agreed details
shall be implemented prior to the completion of the development and maintained
thereafter to the satisfaction of North Ayrshire Council as Planning Authority. 
8.  That any application(s) submitted under Condition 1 shall include a desk study of
the application site (including a review of any previous site investigations) to
assess the likelihood of contamination and assist in the design of an appropriate
site investigation and subsequent suitable quantitative risk assessment.
Remediation proposals shall also be presented in relation to any significant
findings. All documentation shall be verified by a suitably qualified Environmental
Consultant and submitted to the satisfaction of North Ayrshire Council as
Planning Authority. 
9.  If there is a requirement to re-use site won material and/or to import material,
then the assessment criteria and sampling frequency that would adequately
demonstrate its suitability for use shall be submitted to and approved by North
Ayrshire Council as Planning Authority prior to any material being used. In
addition to this and in accordance with BS38882:2015 and BS8601:2013,
material to be used in the top 300mm shall be free from metals, plastic, wood,
glass, tarmac, paper and odours. On completion of the works and at a time or
phasing agreed by the Planning Authority, the developer shall submit a
verification report containing details of the source material and appropriate test
results to demonstrate its suitability for use. 
10.  Any cut and fill proposals or alterations to the existing ground levels should be
clearly marked on any plans and accompanied by appropriate cross sections,
Material Management Plan and be implemented in accordance with any SEPA
waste/soil reuse guidelines, to the satisfaction of North Ayrshire Council as
Planning Authority. 
11.  That any application(s) submitted under Condition 1 shall include details
demonstrating that the increase in road traffic generated as a result of the
development shall not have a detrimental impact on the local air quality or result
in an increase in concentrations of atmospheric pollutants such that statutory Air
Quality Objectives would be exceeded at any location of relevant public
exposure, to the satisfaction of North Ayrshire Council as Planning Authority. 
12.  That any application(s) submitted under Condition 1 shall include details of a
programme of archaeological works in accordance with a written scheme of
investigation which has been submitted by the applicant. 
13.  That any application(s) submitted under Condition 1 shall include details of; 
(i)  a scheme of intrusive site investigations carried out on site to establish the
risks posed to the development by past coal mining activity, and; 
(ii)  any remediation works and/or mitigation measures to address land
instability arising from coal mining legacy, as may be necessary, that have
9

Page 10

been implemented on site in full in order to ensure that the site is made safe
and stable for the development proposed. 
The intrusive site investigations and remedial works shall be carried out in
accordance with authoritative UK guidance. 
5. Notice under Section 127 of the Town and Country Planning (Scotland)
Act 1997: Site To North Of 4 Greenhead Holding, Stevenston 
To seek approval to serve a Notice under Section 127 of the Town and Country
Planning (Scotland) Act requiring cessation of the use of the land for the siting of a
caravan at a site to the North of 4 Greenhead Holding, Stevenston, which would
include removal of a caravan from the land. 
The report noted that the site was a small agricultural unit, previously known as
Hillside Nursery. There was already a caravan on the site which was investigated in
2018 and found to be immune from Planning control by virtue of having been sited for
more than 10 years. The caravan was being used for comfort for those working on site
and was not lived in. 
A second caravan was noted to have been placed on site in 2021. The owner of the
site had not responded to any requests for information regarding the second caravan.
The second caravan was not considered to be required ancillary development for an
existing rural business.  There was no support under the adopted Local Development
Plan (LDP) for the siting of a caravan in this location for residential purposes.  The
second caravan was considered contrary to the policies of the LDP and there were no
material considerations to the contrary. 
The Committee unanimously agreed to grant authority for the service of a Notice
under Section 127 of the Town and Country Planning (Scotland) Act 1997, requiring
the cessation of the use of the land for the siting of a caravan and the removal of the
caravan, as identified in the attached plan, and any associated structures, within 6
weeks of the date of the Notice taking effect. 
The meeting ended at 2.45 p.m. 
10

Page 11

NORTH AYRSHIRE COUNCIL 
Planning Committee 
Locality  Three Towns
Reference 22/00420/PPM
Application Registered 10th June 2022
Decision Due 10th October 2022
Ward Saltcoats And Stevenston 
Recommendation  Approved subject to Conditions 
__________________________________________________________________ 
Location  Site To North Of St Andrews Court Saltcoats Ayrshire 
Applicant  Persimmon Homes And Land Partners (Scotland)
Limited 
Proposal  Erection of 99 dwelling houses
___________________________________________________________________ 
1. Description 
The application site is a 3.4ha greenfield site to the north of Saltcoats. It is located to the
north of existing residential areas at St Andrews Court/Clytus Court/Betsy Miller Wynd and
to the west of the previous phase of the Sharphill housing development which is currently
under construction. To the north and west of the site are open agricultural fields. The site is
open in character with gentle slopes and the site is bisected diagonally by a hedgerow which
follows the line of a field drainage ditch. 
It is proposed to erect a residential development comprising of 99 units and associated
infrastructure on the site. The proposed layout would feature two points of vehicular access,
one from Sharphill Phase 2C to the east and one from Braga Gardens to the south. In
addition, there would be a road link provided for a potential future development to the west.
Internally, the road layout would consist of a main east-west through road with a secondary
residential street to the north. The existing field drainage ditch would be diverted to the north
of the site. A SuDs basin would be located in the western corner of the site along with a
pumping station. A small area of open space would be provided in the eastern portion of the
site. 
Agenda Item 3
11

Page 12

Sixteen different house types are proposed. The development would be made up of
detached, semi-detached, and terraced houses with 2-4 bedrooms. All houses would be two
storeys (with some having additional living space in the attic) would feature a gabled roof
design. Finishing materials would be facing brick, render and concrete roof tiles. Some
houses would be full brick whereas others would be half brick half render. Some house
types would feature integral garages. All houses would feature photovoltaic panels on the
roof. 
In the adopted Local Development Plan (LDP) the site lies within a General Urban Area
allocation. The following policies would apply to the development:  
- The Towns and Villages Objective of Strategic Policy 1: Spatial Strategy;
- Strategic Policy 2: Placemaking;
- Policy 1: New Homes and Maintaining an Effective Housing Land Supply;
- Policy 22: Water Environment Quality;
- Policy 23: Flood Risk Management; 
- Policy 27: Sustainable Transport and Active Travel;
- Policy 29: Energy Infrastructure Developments; and
- Policy 31: Future Proofing for Heat Networks. 
Planning Permission in Principle for a mixed-use development including residential at
Sharphill was granted subject to conditions 18th March 2015 (ref: 14/00626/PPPM). Since
then, approval of some matters specified in those conditions has been granted. On the 2nd
of March 2017, permission for the construction of a distributor access road through the site
was approved as Phase 1 of the development (ref: 16/01232/MSCM). 
In December 2018, a Matters Specified in Condition application was approved for the
erection of 95 dwellinghouses on the site to the north Of Meikelaught Place and west of
Windmill Wynd (18/00940/MSCM). This constitutes Phase 2A of the development. Also
approved in December 2018 was Phase 2B which consist of the erection 76 dwellinghouses
for social rent to the east of Phase 2A and south of the Sharphill industrial estate
(18/00934/MSCM). Phase 2C of the development was approved in May 2021 and consist of
a further 41 houses (21/00074/PP). Phases 2A, 2B have been mostly completed and phase
2C is currently under construction. 
The current application site lies outwith the site of the approved Planning Permission in
Principle for Sharphill (14/00626/PPPM), however, it makes up part of the larger Sharphill
site and is designated in the LDP as 'West of Sharphill'. The applicant submitted the
Proposal of Application Notice (PAN) in February 2022 (22/00086/PREAPM). The applicant
has also submitted an Environmental Impact Assessment (EIA) Screening Opinion
(22/00452/EIA). The Council has confirmed that an EIA is not required. The applicant
signed a Processing Agreement with The Council on the 10th June 2022. 
Since the original submission, the Case Officer has secured design improvements to the
layout to reorientate a number of the houses so that they would face onto the street. The
vehicle link to Barga Gardens has also been confirmed. A request to create an additional
vehicle or pedestrian link to the north in the interest of future planning was not achieved as
the entire length of the northern boundary of the site is occupied by the diverted drainage
ditch or steep topography. 
Supporting Information:
12

Page 13

Design and Access Statement:
The primary vehicle route will run through the development and link with the Phase 2C to the
east as well as providing a link to a future development to the west. The re-routed drainage
channel has been incorporated into the open space strategy for the development. The
proposed house types are in-keeping with the existing housing being built at Sharphill. It is
considered that the proposed development accords with the relevant LDP policies as well
as with Designing Streets and Designing Places. 
Pre-Application Consultation Report:
An advert was placed in the Ardrossan and Saltcoats Herald on the 23rd March 2022 to
advertise the online public consultation event which was held on the 14th of April. A website
was created to display information about the proposed development. There is not an active
Community Council in Saltcoats. A copy of the Pan was sent to all local councillors in the
Saltcoats ward. The online event was attended by 2 people. No comments were received. 
Air Quality Impact Assessment:
The site is not located within an Air Quality Management Area. It is concluded that the
qualitative phase dust risk assessment demonstrates that the potential effects for air quality
at sensitive receptors are not considered to be significant and that a detailed Air Quality
Impact Assessment is not required. 
Ecological Report:
The habitats on the site include scattered scrub, broadleaved parkland/scattered trees,
semi-improved natural grassland, improved grassland and eutrophic running water. No
evidence of protected species or habitats were recorded during the survey. Five nests were
found in the scattered trees on the permitter of the fields two of which were determined to be
active. If work is undertaken during the bird nesting season only sections of the site more
than 10m in distance from the active nests should be allowed to be developed. It is
recommended that a bird breeding survey is undertaken to determine which nests are
active. If any trees are scheduled to be felled it is advised that a preliminary roost
assessment is undertaken to determine if any bat roosts are present. 
Flood Risk Assessment: 
The closest watercourse is the Stanley Burn approx. 600m to the west of the site. The site is
not at risk of fluvial flooding from this watercourse. There are a number of land drains that
run through or near the site, the largest being one running along the western boundary. A
minor drain runs diagonally through the site along a hedgerow. There should be no
development within 3m of the drain along the western edge of the site. 
Site Investigation Report:
The site is not located in an area of known mining activity and no records of coal mining
have been found. The site has been occupied by agricultural land throughout its history and
therefore it is not considered likely that there is any significant chemical contamination. No
invasive plant species were found.   
Transport Assessment:
The proposed development would tie in with the existing footpath network. It is located
850m from the nearest shop and 650m from the nearest primary school. The development
is located within 1,600m of local facilities and amenities and is therefore considered in
accordance with transport planning policy. There are no dedicated cycle routes around the
13

Page 14

development. The nearest bus stops to the proposed development are on Burns Avenue
near Fleming Crescent (approx. 400m from the site) which provides a link to Saltcoats town
centre and Stevenston. Both Saltcoats and Ardrossan South beach railway stations are
located approx. 2,500m from the site (approx. 30 mins walk). Traffic surveys were carried
out on nearby junctions. The junctions would operate efficiently within their capacity with the
addition of the traffic from the proposed development. 
Relevant Development Plan Policies 
SP1 - Towns and Villages Objective
Towns and Villages Objective 
Our towns and villages are where most of our homes, jobs, community facilities, shops and
services are located. We want to continue to support our communities, businesses and
protect our natural environment by directing new development to our towns and villages as
shown in the Spatial Strategy. Within urban areas (within the settlement boundary), the LDP
identifies town centre locations, employment locations and areas of open space. Most of the
remaining area within settlements is shown as General Urban Area. Within the General
Urban Area, proposals for residential development will accord with the development plan in
principle, and applications will be assessed against the policies of the LDP. New
non-residential proposals will be assessed against policies of this LDP that relate to the
proposal. 
In principle, we will support development proposals within our towns and villages that: 
a) Support the social and economic functions of our town centres by adopting a town
centre first principle that directs major new development and investment to town
centre locations as a priority including supporting town centre living.
b) Provide the right new homes in the right places by working alongside the Local
Housing Strategy to deliver choice and variety in the housing stock, protecting land
for housing development to ensure we address housing need and demand within
North Ayrshire and by supporting innovative approaches to improving the volume
and speed of housing delivery.
c) Generate new employment opportunities by identifying a flexible range of business,
commercial and industrial areas to meet market demands including those that would
support key sector development at Hunterston and i3, Irvine.
d) Recognise the value of our built and natural environment by embedding placemaking
into our decision-making. 
e) Prioritise the re-use of brownfield land over greenfield land by supporting a range of
strategic developments that will deliver:
o regeneration of vacant and derelict land through its sustainable and productive
re-use, particularly at Ardrossan North Shore, harbour and marina areas,
Montgomerie Park (Irvine) and Lochshore (Kilbirnie).
o regeneration and conservation benefits, including securing the productive re-use of
Stoneyholm Mill (Kilbirnie) and supporting the Millport Conservation Area
Regeneration Scheme.
f) Support the delivery of regional partnerships such as the Ayrshire Growth Deal in
unlocking the economic potential of the Ayrshire region. 
14

Page 15

Strategic Policy 2
Placemaking
Our Placemaking policy will ensure we are meeting LOIP priorities to make North Ayrshire
safer and healthier by ensuring that all development contributes to making quality places.
The policy also safeguards, and where possible enhances environmental quality through
the avoidance of unacceptable adverse environmental or amenity impacts. We expect that
all applications for planning permission meet the six qualities of successful places,
contained in this policy. This is in addition to establishing the principle of development in
accordance with Strategic Policy 1: Spatial Strategy. These detailed criteria are generally
not repeated in the detailed policies section of the LDP. They will apply, as appropriate, to all
developments. 
Six qualities of a successful place 
Distinctive
The proposal draws upon the positive characteristics of the surrounding area including
landscapes, topography, ecology, skylines, spaces and scales, street and building forms,
and materials to create places with a sense of identity. 
Welcoming
The proposal considers the future users of the site and helps people to find their way
around, for example, by accentuating existing landmarks to create or improve views
(including sea views), locating a distinctive work of art in a notable place or making the most
of gateway features to and from the development. It should also ensure that appropriate
signage and lighting is used to improve safety and illuminate attractive buildings.
Safe and Pleasant
The proposal creates attractive places by providing a sense of security, including by
encouraging activity, considering crime rates, providing a clear distinction between private
and public space, creating active frontages and considering the benefits of natural
surveillance for streets, paths and open spaces.
The proposal creates a pleasant, positive sense of place by promoting visual quality,
encouraging social and economic interaction and activity, and by considering the place
before vehicle movement.
The proposal respects the amenity of existing and future users in terms of noise, privacy,
sunlight/daylight, smells, vibrations, glare, traffic generation, and parking. The proposal
sufficiently investigates and responds to any issues of ground instability. 
Adaptable
The proposal considers future users of the site and ensures that the design is adaptable to
their needs. This includes consideration of future changes of use that may involve a mix of
densities, tenures, and typologies to ensure that future diverse but compatible uses can be
integrated including the provision of versatile multi-functional greenspace. 
Resource Efficient
The proposal maximises the efficient use of resources. This can be achieved by re-using or
sharing existing resources and by minimising their future depletion. This includes
consideration of technological and natural means such as flood drainage systems, heat
networks, solar gain, renewable energy and waste recycling as well as use of green and
blue networks. 
Easy to Move Around and Beyond
15

Page 16

The proposal considers the connectedness of the site for people before the movement of
motor vehicles, by prioritising sustainable and active travel choices, such as walking, cycling
and public transport and ensuring layouts reflect likely desire lines, through routes and
future expansions. 
Detailed Policy 1 -New Homes/Land Supply
Policy 1: 
New Homes and Maintaining an Effective Housing Land Supply 
In principle we will support and promote residential development of the 51 effective housing
supply sites shown in Schedules 2a and 2b. We will protect them by resisting alternative
development, including significant reductions in capacity which would undermine our ability
to confirm an ongoing 5-year land supply.
In principle, we will also support and promote residential development
of our 27 long-term housing sites shown in schedule 3. In particular, but not limited to, where
they would contribute to our ongoing 5-year effective land supply.
Notwithstanding the above, we will support ancillary development for a range of
accommodating and integrated uses including locally important community, leisure, and
other employment uses like shops, banks, cafes, workshops, garages, and small offices
within these sites where they would not negatively impact upon our ability to maintain an
effective 5 year housing land supply.
We will monitor the delivery of new homes in North Ayrshire through a housing land audit to
ensure the maintenance of an effective five-year supply of land for housing. Where we
identify and confirm a shortfall we will consider innovative approaches to enable
development in the first instance. We will only support new housing proposals where they
would help us achieve the vision, for example by aligning with the principles of the spatial
strategy and being compliant with other aspects of the plan particularly by way of impact on
committed infrastructure and the environment. 
Detailed Policy 22 - Water Environment Quality 
Policy 22: 
Water Environment Quality 
Proposals for additional cemetery provision to meet identified needs within our locality areas
of Irvine, Kilwinning, Arran, North Coast, Three Towns and Garnock Valley will be supported
where unacceptable environmental and amenity impacts are avoided. Groundwater
assessments may be required to support proposals with mitigation measures identified and
agreed where necessary. 
We will support development that helps achieve the objectives of the Water Framework
Directive and the River Basin Management Plan for Scotland. Generally, development
which would lead to the deterioration of the water environment will be resisted unless it
would deliver significant social, environmental or economic benefits. 
Development will be required to ensure no unacceptable adverse impact on the water
environment by:
16

Page 17

a) Protecting and enhancing the ecological status and riparian habitat, natural heritage,
landscape values and physical characteristics of water bodies (including biodiversity
and geodiversity);
b) Protecting and enhancing existing flood plains; protecting opportunities for public
access to and recreation and enjoyment on and around lochs, rivers, burns, wetlands
and the coastal marine area; and
c) Having regard to any designated Bathing Waters. Where engineering works are
required in or near water bodies, there will be a presumption in favour of soft
engineering techniques and against the culverting of watercourses, unless there is
no suitable alternative. Proposals for culverting of watercourses for land gain
may only be justified if the applicant can demonstrate that: 
o No other practical option exists that would allow the watercourse to remain open; and
o The proposed development is of over- riding public interest. 
We support connection to public sewerage systems in the first instance but recognise that
wastewater solutions must be affordable and delivered at the most appropriate scale and
that in many cases septic tank systems can be the most sensible solution for a household or
small community (this also might be bespoke  for our island communities). We will consider
the cumulative impact of such solutions and support a preference for community solutions. 
Development should ensure that appropriately sized buffer strips are maintained between
the built and water environments. 
Indicative Width of watercourse (top of bank) Indicative Width of buffer strip (either side)
Less than 1m                                                     6m
1-5m                                                                      6-12m
15-15m                                                         12-20m
15m+                                                                         20m+         
Detailed Policy 23-Flood Risk Management
Policy 23: 
Flood Risk Management 
We will support development that demonstrates accordance with the Flood Risk Framework
as defined in Scottish Planning Policy and shown in schedule 7, relevant flood risk
management strategies and local flood risk management plans. We will also support
schemes to manage flood risk, for instance through natural flood management, managed
coastal realignment, wetland or green infrastructure creation.
Generally, development should avoid locations of flood risk and should not lead to a
significant increase in the flood risk elsewhere. Land raising and elevated buildings will only
be supported in exceptional circumstances, where it is shown to have a neutral or better
impact on flood risk outside the raised area. 
Development proposals should:
o Clearly set out measures to protect against, and manage, flood risk.
o Include sustainable urban drainage systems (SuDS) where surface water is
proposed to be discharged to the water environment, in accordance with the Water
Environment (Controlled Activities) (Scotland) Regulations 2011 as amended.
17

Page 18

o Include provision of temporary/construction phase SuDS.
o include appropriate long-term maintenance arrangements.
o Be supported by an appropriate flood risk assessment where at risk of flooding from
any source in medium to high risk areas and for developments in low to medium risk
areas identified in the risk framework (schedule 7).
o Take account of SEPA's flood risk and land use vulnerability guidance (2018) and
any relevant updates to, or replacements of this guidance.   
Detailed Policy 27
Sustainable Transport and Active Travel 
We will support development that:
contributes to an integrated transport network that supports long term sustainability
o reduces inequality by improving the accessibility and connectivity of employment
opportunities and local amenities
o provides safe and convenient sustainable transport options and supports modal shift
to sustainable transport and active travel.
o reduces the need to travel or appropriately mitigates adverse impacts of significant
traffic generation, road safety and air quality, including taking into account the
cumulative impact.
o takes a design-led, collaborative approach to street design to provide safe and
convenient opportunities for integrated sustainable travel in the following order of
priority: pedestrians, people on cycles, people using collective transport (buses,
trains etc.) and people using private transport.
o considers the potential requirements of other infrastructure providers, including
designing for the potential development of district heat networks by for example
incorporating access points into the transport network to allow for future pipe
development or creating channels underneath the road/infrastructure to enable pipe
development with minimal disruption to the networks.
o enables the integration of transport modes and facilitates movement of freight by rail
or water (in preference to road). This would include, for example, the provision of
infrastructure necessary to support positive change in transport technologies, such
as charging points for electric vehicles and the safeguarding of disused railway lines
with the reasonable prospect of being used as rail, tram, bus rapid transit or active
travel routes.
o considers the impact on, and seeks to reduce risk to level crossings, including those
located within Ardrossan, Stevenston and Gailes. 
Proposals are expected to include an indication of how new infrastructure or services are to
be delivered and phased, and how and by whom any developer contributions will be made. 
We will take account of:
o the implications of development proposals on traffic, patterns of travel and road
safety.
o Significant traffic generating uses should be sited at locations that are well served by
public transport, subject to parking restraint policies, and supported by measures to
promote the availability of high-quality public transport services. Where this is not
achievable, we may seek the provision of subsidised services until a sustainable
service is achievable.
18

Page 19

o the potential vehicle speeds and level of infrastructure provided for the expected
numbers of trips by all modes.
o the relationship between land use and transport and particularly the capacity of the
existing transport network, environmental and operational constraints, and proposed
or committed transport projects.
o committed and proposed projects for the enhancement of North Ayrshire's transport
infrastructure, including improved park and ride provision.
o specific locational needs of rural communities. We recognise that in rural areas we
need to be realistic about the likely viability of public transport services and
innovative solutions such as demand-responsive public transport and small scale
park and ride facilities at nodes on rural bus corridors will be considered.
o The Council's adopted Local Transport Strategy, Core Paths Plan, Town Centre
Parking Strategy and parking requirements.
o The need to mitigate and adapt to climate change with regard to the Climate Change
(Scotland) Act 2009.
o The provision of new and improved links to existing and proposed active travel routes
which are integrated with the wider strategic network, including the National Walking
and Cycling Network, core paths and the Ayrshire Coastal Path.
Developments likely to generate significant additional journeys will be required to be
accompanied by a Transport Assessment, Air Quality Assessment and a Travel Plan. A
Transport Statement will be required for smaller scale developments that will not have a
major impact on the transport network, but are still likely to have an impact at a local level on
the immediate transport network. 
National Development: 
The National Walking and Cycling Network (NWCN) was designated as a national
development within the National Planning Framework (NPF3). This is an ambitious project
which aims to grow Scotland's
network of paths from 6,000 to 8,000 km by 2035. Key routes in North Ayrshire which will
contribute to this network are detailed below. These are being developed in partnership with
Sustrans and Scottish Natural Heritage as lead organisations for the delivery of the NWCN. 
These include the development of an off-road alignment for:
o National Cycle Network (NCN) Route 73 (North) between Brodick and Corrie on the
Isle of Arran
o NCN Route 753 between Skelmorlie and Ardrossan
o While not explicitly referenced in NPF3, support will be given to development of an
off-road alignment for NCN Route 7 between Kilwinning and Kilbirnie. 
Detailed Policy 29 - Energy Infrastructure Development 
Policy 29: 
Energy Infrastructure Development 
We will support development proposals for energy infrastructure development, including
wind, solar, tidal, cropping and other renewable sources, where they will contribute
positively to our transition to a low carbon economy and have no unacceptable adverse
environmental impacts, taking into consideration (including cumulatively) the following: 
19

Page 20

Environmental
o Communities and individual dwellings - including visual impact, residential amenity,
noise and shadow flicker;
o Water quality;
o Landscape - including avoiding unacceptable adverse impacts on our landscape
designations;
o Effects on the natural heritage - including birds;
o Carbon rich soils including peat;
o Impacts on the historic environment - including scheduled monuments, listed
buildings and their settings. 
Community
o Establishing the use of the site for energy infrastructure development;
o providing a net economic impact - including socio-economic benefits such as
employment, associated business and supply chain opportunities;
o Scale of contribution to renewable energy generation targets;
o Public access - including impact on long distance walking and cycling routes and
scenic routes identified in the National Planning Framework;
o Impacts on tourism and recreation;
o Specific locational opportunities for energy storage/generation. 
Public Safety
o Greenhouse gas emissions;
o Aviation and defence interests and seismological recording;
o Telecommunications and broadcasting installations - particularly ensuring that
transmission links are not compromised; radio telemetry interference and below
ground assets;
o Road traffic and adjacent trunk roads;
o Effects on hydrology, the water environment and flood risk including drinking water
quality and quantity (to both the public and private water supplies);
o Decommissioning of developments - including ancillary infrastructure, and site
restoration and aftercare. 
Proposals should include redundancy plans which will demonstrate how apparatus will be
timeously removed as reasonably soon as the approved scheme ceases operation. There
may be a requirement for financial bonds to ensure that decommissioning can be achieved.
Taking into consideration the above, proposals for wind turbine developments should
accord with the Spatial Framework (as mapped) and consider the current Landscape
Capacity Study for Wind Farm Development in North Ayrshire. This study will be used as a
point of reference for assessing all wind energy proposals including definitions of what small
to large scale entails. 
Buildings: Low and Zero Carbon Generating Technology 
Proposals for all new buildings will be required to demonstrate that at least 10% of the
current carbon emissions reduction set by Scottish Building Standards will be met through
the installation and operation of low and zero-carbon generating technologies. A statement
will be required to be submitted demonstrating compliance with this requirement. The
percentage will increase at the next review of the local development plan. 
This requirement will not apply to: 
1. Alterations and extensions to buildings 
20

Page 21

2. Change of use or conversion of buildings 
3. Ancillary buildings that stand alone and cover an area less than 50 square metres 
4. Buildings which will not be heated or cooled, other than by heating provided solely for
frost protection. 
5. Buildings which have an intended life of less than two years. 
Detailed Policy 31 - Future Proofing for
Policy 31: 
Future Proofing for Heat Networks 
We will support proposals for the creation or enhancement of district heat networks in as
many locations as possible in North Ayrshire (even where they are initially reliant on
carbon-based fuels if there is potential to convert them to run on renewable or low carbon
sources of heat in the future).
We will seek to identify and safeguard existing and future heat network generation and
distribution infrastructure, including piperuns and pipework within, and to the curtilage of,
new developments. 
Proposals for development that constitute a significant heat source or substantial
development* which would not result in the creation or enhancement of district heat
networks should include: 
i) provision for on-site heat recovery and re-use infrastructure; or
ii) a heat network generation and distribution infrastructure plan (a district heating plan),
taking into account the potential to connect to future heat demand sites; or
iii) demonstrable evidence that district heating or other forms of renewable generation
storage have been explored but are not feasible for technical (proximity, geography,
safety etc) or economic reasons. 
* 'Substantial' developments consist of urban extensions, large regeneration areas or large
development sites subject to master planning or large mixed use developments and major
sites (50 residential units and above). There is, however, an element of judgment that will
need to be applied here and it might be that some other locations offer significant potential
for heat networks due to their local context, support from the local authority, and 'buy in' from
developers. 
2. Consultations and Representations 
Neighbour notification was undertaken, and the application was advertised in the local
press. Seven letters of objection have been received; the points raised in which are
summarised below: 
1. The proposed properties on the southern boundary would overlook the existing properties
to the south along St Andrews Court, Clytus Court and Betsy Miller Wynd which would result
in loss of privacy for the existing properties. These properties should be reoriented 45
21

Page 22

degrees and additional screening provided in the form of hedges and trees along the
boundary line. 
Response:  The proposed dwellinghouses close to the southern boundary of the site are
oriented to face the road to the north which is considered optimal from a place-making
perspective, and it would not be considered acceptable to re-orient them so that they were
not facing the road. The closest properties at plots 10-21 have a back garden length of a
minimum  of approx. 8.5m. The closest distance between the rear elevations of the houses
on St Andrews Court and the rear elevations of the proposed houses is approx. 17m, which
is considered to be an acceptable separation distance for a suburban location, and it is not
considered that the proposed dwellinghouses close to the southern boundary would lead to
significant loss of privacy for the existing houses to the south. Sectional drawings have been
provided indicating the proposed levels to these houses. It is not considered that any
additional screening would be required. 
2. The proposed development would result in the loss of natural habitat and the site contains
a range of habitats and species. Additional hedges, trees and wildflower areas should be
provided within the site should the application be approved. No open space is proposed in
the layout. 
Response: The site has been allocated as a housing site in the LDP. The applicant has
provided an Ecological Report which finds no evidence of protected species or habitats. A
condition requiring a landscaping scheme could be attached to any permission which may
be forthcoming in order to ensure that a suitable level of planting is undertaken. A small area
of open space is provided within the development site. The site is located on the edge of
Saltcoats, and it is considered that there is sufficient access to green and amenity spaces. 
3. The proposed access from Barga Gardens would increase noise, pollution and create
road safety issues for the existing properties on Barga Gardens. 
Response: It is not considered that the Barga Gardens vehicular link would result in
significant additional noise, pollution or road safety issues. The link would be a secondary
route and the majority of the traffic would utilise the main east/west route through the site. 
The Barga Gardens link is considered important in the interest of integrating the
development in with the existing road network and making the development easy to move
around and beyond. 
4. The proposed pumping station could lead to additional noise and odours affecting the
existing nearby dwellinghouses. 
Response: The applicant has confirmed that the pumping station would not result in any
significant noise. North Ayrshire Council (NAC) Environmental Health was consulted and
did not object to the pumping station on noise or smell grounds, subject to a Planning
condition. 
5. The scale of the proposed development is excessive. 
Response: The application site makes up approximately half of the 'West of Sharphill'
long-term housing site which has an indicative capacity of 200 units. The proposed
development would have 99 units. The proposed development would have a density of
approx. 29 dwellings per hectare which is considered suitable for a suburban development.
22

Page 23

6. The proposed development would have a negative impact on property prices in the
surrounding area. 
Response: This is not a material Planning consideration. 
Consultations: 
NAC Active Travel and Transportation: No objections. Further discussions with NAC
Flooding will be required with relation to the diverted drainage ditch. The impact of the
potential vehicle link with Barga Gardens should be discussed with Active Travel and
Transportation. 
Response: Such discussions between the applicant and NAC Flooding have taken place,
and NAC Flooding have confirmed that they do not object to the proposal. The vehicle link to
Barga Garden has been secured by Planning and is considered necessary in the interest of
placemaking and creating a neighbourhood that is easy to move around and beyond. Full
details of this vehicular link can be secured via condition. The details of the road design can
also be finalised during the Road Construction Consent. 
NAC Environmental Health: No objections, subject to conditions relating to a Remediation
Strategy, Construction Environmental Management Plan and noise from the pumping
station. 
Response: Noted, such conditions could be attached to any Planning Permission which
may be forthcoming. 
NAC Flooding: Initially objected due to the proposal to drain surface water into the field
ditch to the west of the site. This ditch has experience flooding events in the past. The
applicant has confirmed that works will be undertaken to the ditch downstream of the
proposed SuDS basin to address the flooding concerns which will act to reduce flow within
the downstream ditch compared to current conditions. Therefore, NAC Flooding has
removed the objection, subject to conditions. 
Response: Noted, such conditions could be attached to any Planning Permission which
may be forthcoming. 
Scottish Environmental Protection Agency (SEPA): Initially objected on the basis on a
lack of information with regards to flood risk. Following the submission of additional
information by the applicant's flooding consultants, SEPA has removed the objection. 
Response: Noted. 
NAC Education: Modelling shows sufficient capacity at the local schools to accommodate
the number of additional children expected. 
Response: Noted. 
Scottish Water: No objections. 
Response: Noted. 
23

Page 24

West of Scotland Archaeological Service (WOSAS): No objections subject to a condition
requiring a scheme of archaeological works to be undertaken. 
Response: Noted, such a condition could be attached to any Planning Permission which
may be forthcoming. 
3. Analysis 
The Towns and Villages Objective of Strategic Policy 1: Spatial Strategy of the LDP states
that within areas designated as General Urban Area, proposals for residential development
will accord with the LDP in principle, and that applications will be assessed against the
relevant policies of the LDP. 
Policy 1: New Homes and Maintaining an Effective Housing Land Supply, of the LDP, states
that we will in principle support and promote residential development of the 51 effective
housing supply sites identified in Schedule 2a and 2b of the LDP. It goes on to state that we
will in principle support and promote residential development of our 27 long-term housing
sites shown in Schedule 3 of the LDP. The application site makes up part of the 'West of
Sharphill' long-term housing site shown in Schedule 3 of the LDP, with an indicative
capacity of 200 units. The site is therefore considered to be an acceptable location in
principle for a residential development. As the application site makes up just under half of
the area of the allocated housing site and has just under half of the indicative capacity it is
considered that the proposed development is of an appropriate density. The applicant has
advised of plans to progress the second section of the West of Sharphill site in the near
future. The proposal accords with Policy 1. 
Strategic Policy 2: Placemaking, of the LDP, states that proposals should accord with the
qualities of successful places outlined within the policy. The proposed development
incorporates sixteen house types including terraces, semi-detached and detached houses.
All the houses are two storeys with gabled roof designs. Earlier phases of Sharphill (2B and
2C) feature the same house types and the existing housing development to the south also
features very similar houses both in terms of style and finishing materials. It is therefore
considered that the proposed development would be in-keeping with the character of the
neighbourhood. It is considered appropriate to attach a condition which would require
further details with regards to the external finishes to ensure the final choice of materials is
appropriate for the locality and contains enough variety to provide visual intertest. 
The layout of the development would primarily feature straight and legible streets, however,
the eastern part of the site has a more fragmented layout due to the diverted drainage ditch.
Improvements to the layout were secured by the case officer to ensure that the majority of
the houses face onto the street which would create attractive and enclosed streetscapes.
The layout would be well connected to the surrounding area with vehicle links to the south
and east tying-in with existing developments and a future road link to the remainder of the
allocated housing site to west being provided. As described previously, the case officer
recommended a link be provided to the unallocated countryside to the north in the interest of
future planning, however, this was not possible due to site constraints. Overall, it is
considered that the internal layout is comprehensible, and that the development would be
easy to move around and beyond. 
24

Page 25

An area of open space would be provided in the eastern part of the site and the SuDs basin
would be located in thew western part. The development is on the edge of Saltcoats and
benefits from access to plenty of open space. The nearest playground is at Allan Gardens
approx. 200m to the south of the site and accessible via a pedestrian footpath.  All houses
within the development would have private rear gardens enclosed by 1.8m high timber
fences and front gardens would be open in character. Further details of landscaping are
required and could be ensured via condition. 
The layout of the site has been designed in order to ensure that the houses do not have their
privacy or access to daylight affected through overlooking or overshadowing from other
properties. There is a change in levels throughout the site and experience with the previous
phases has shown that ground works may be required to create level development
platforms which could lead to amenity issues. It is therefore considered necessary to attach
a condition requiring details of any ground works/cut and fill exercises to be undertaken.
Sufficient separation has been provided with the existing houses to the south to ensure that
there would be no significant loss of privacy for any existing properties.  All houses have
been provided with two parking spaces, the majority of which are located in-curtilage. Visitor
parking is spread evenly throughout the site.  In conclusion, the proposed development
meets with the qualities of successful places and therefore accords with Strategic Policy 2:
Placemaking. 
Policy 22 of the LDP states that development will be required to ensure no unacceptable
adverse impact on the water environment. Development should ensure that appropriately
sized buffer strips are maintained between the built and water environments. Related to this
issue is Policy 23, which deals with flood risk management. Taking both of these polices
together, there is an existing drainage ditch which bisects the site and a further drainage
ditch along the western boundary. Discussions have taken place between the applicant,
NAC Flooding and SEPA with regards to the drainage proposals which involve diverting the
drainage ditch which runs through the site and discharging the surface water run off via the
detention basin into the existing field ditch to the west of the site. Works will be undertaken
to the field ditch downstream of the site to prevent flooding. While this area falls outwith the
application site, it is within land controlled by the applicant and the flood prevention works
can therefore be addressed via condition.  As highlighted previously in this report, following
these discussions, NAC Flooding and SEPA have both withdrawn their objections to the
proposed development. 
With regards to foul water, a pumping station would be provided adjacent to the SuDs basin.
The only above ground component of the pumping station would be a kiosk measuring
approx. 7sqm in area and 1.8m in height. The applicant has advised that the pumping
station would not lead to significant noise or smells. NAC Environmental Health has
indicated a Planning condition to limit noise from the pumping station. The proposed
development accords with Policies 22 and 23 of the LDP. 
Policy 27 relates to sustainable transport and active travel. The proposed development is
located within easy walking distance of a primary school, shop, playpark and bus stop. The
nearest train stations are approx. 30 minutes' walk away. However, given the site's
peripheral location and allocation in the LDP, it is considered acceptable in this instance.
Internally, the site is well laid out to minimise traffic speeds and create a pleasant pedestrian
environment. The site layout makes use of the available connections to the neighbouring
residential areas and thereby creates an integrated and walkable neighbourhood. Sufficient
25

Page 26

levels of parking have been provided and visitor parking is spread evenly throughout the
site. The development accords with Policy 27. 
Policy 29: Energy Infrastructure Developments, requires that all proposals for new buildings
demonstrate that at least 10% of the current carbon emission reduction targets set by
Scottish Building Standards are met through the use of low or zero carbon generating
technologies. All new homes would have photovoltaic roof panels installed and modern
heating and insulation which would allow them to achieve this target. The proposed
development accords with Policy 29. 
Policy 31 relates to future proofing for heat networks. The proposed development would
utilise modern building designs which would minimise the energy requirements for heating
through modern insulation. The houses have been oriented to take advantage of solar gain
where possible. The site is not considered to be a suitable candidate for a district heating
system. The proposal accords with Policy 31. 
In conclusion, the proposal is in accordance with all of the relevant polices of the LDP, and
the development would entail the delivery of part of a housing site which has been identified
and allocated as part of the local development plan process.  Accordingly, the application is
recommended for approval subject to the conditions referred to in this report. 
4. Full Recommendation 
Approved subject to Conditions 
Reasons for Decision 
Condition 
1. That prior to the commencement of the development hereby approved, the developer
shall provide full details of the proposed finishing materials for the written approval of
North Ayrshire Council as Planning Authority. Thereafter, the development shall
progress in accordance with such details as may be approved. 
Reason
In order to ensure that the finishing materials are high quality and attractive; in the
interest of the visual amenity of the area. 
Condition 
2. That no development shall take place until there has been submitted to and approved
by North Ayrshire Council as Planning Authority a scheme of landscaping, which
shall include details of species, planting densities, soil treatment and aftercare and
shall include indications of all existing trees and hedgerows on the land and details of
any to be retained together with measures for their protection in the course of the
development. 
Reason 
In order to ensure that the site is appropriately landscaped, in the interest of amenity. 
26

Page 27

Condition 
3. That all planting, seeding or turfing comprised in the approved details of landscaping
shall be carried out in the first planting season and seeding seasons following the
occupation of the buildings or the completion of the development, whichever is the
sooner; and any trees or plants which, within a period of five years from the
completion of the development die, are removed or become seriously damaged or
diseased shall be replaced in the next planting season with others of a similar size
and species, unless North Ayrshire Council as Planning Authority gives written
consent to any variation. 
Reason
In order to ensure that the approved landscaping is carried out and maintained, in the
interest of amenity 
Condition 
4. That prior to the commencement of the development, hereby approved, the
developer shall provide a proposed topographical plan displaying full details of
Finished Floor Levels, any ground works, cut and fill and site levelling for the written
approval of North Ayrshire Council as Planning Authority. Thereafter, the
development shall progress in accordance with such details as may be approved by
North Ayrshire Council as Planning Authority. 
Reason
In order to ensure that any changes to the ground levels do not result in overlooking
or overshadowing of neighbouring properties. In the interest of amenity. 
Condition 
5. Site clearance or similar works shall not take place during the nesting bird period
(March to August, inclusive). If works cannot be undertaken outside this period, then
a breeding bird survey shall be undertaken to determine which nests are active, and
no section of the site within 10m of an active nest shall be cleared until the bird
nesting season is over. All to the satisfaction of North Ayrshire Council as Planning
Authority. 
Reason
In order to ensure no nesting or breeding birds are impacted by the proposed
development. In the interest of ecology. 
Condition 
6. If any trees are scheduled to be felled as part of the development, a Preliminary
Roost Assessment shall be undertaken on the trees scheduled to be felled, and the
results shall be submitted to North Ayrshire Council as Planning Authority.
Thereafter, if any remediation works are required, they shall be undertaken as
agreed, in writing by North Ayrshire Council as Planning Authority. 
Reason
In order to ensure no bats are impacted by the proposed development. In the interest
of ecology. 
Condition
27

Page 28

7. That prior to any development commencing the applicant shall submit a Remediation
Strategy for the written approval of North Ayrshire Council as Planning Authority as
recommended the in the Ground Investigation Report by JPB June 2020,
UG537-14/MAK. Thereafter, the development shall progress in accordance with the
approved Remediation Strategy. 
Reason 
In the interest of public health. 
Condition 
8. That the applicant shall submit a Construction Environmental Management Plan
(CEMP) for the written approval of North Ayrshire Council as Planning Authority prior
to the commencement of any works, as recommended within the submitted Air
Quality Impact Assessment report by ITPEnergised, May 2022, Project No 5272.
Thereafter, the development shall progress in accordance with the approved CEMP. 
Reason 
In the interest of public health. 
Condition 
9. The rated noise level, as defined in BS4142:2014 +A1:2019, from the operation of
the proposed pumping station must not exceed the existing background noise level
at the curtilage of any noise sensitive property, to the satisfaction of North Ayrshire
Council as Planning Authority. 
Reason
In order to ensure that the pumping station does not cause a noise disturbance; in the
interest of amenity. 
Condition
10. That prior to the commencement of the development hereby approved, the full details
of the proposed improvements or alterations to the existing ditches and the detail of
the proposed ditch both within and outwith the application site shall be submitted for
the written approval of North Ayrshire Council as Planning Authority. For the
avoidance of doubt, this shall include details of culverts (road crossings) and a '1 in
200' year critical storm resilience check on the proposed drainage system, including
identification and design of any necessary flood flow-paths, together with
maintenance of these flow-paths. Thereafter, the approved details should be
implemented prior to the completion of the development and maintained in
perpetuity. 
Reason 
In the interest of flood risk management. 
Condition
11. That no development shall take place within the development site as outlined in red
on the approved plan until the developer has secured the implementation of a
programme of archaeological works in accordance with a written scheme of
investigation which has been submitted by the applicant, agreed by the West of
Scotland Archaeology Service, and approved by North Ayrshire Council as Planning
Authority. Thereafter the developer shall ensure that the programme of
28

Page 29

archaeological works is fully implemented and that all recording and recovery of
archaeological resources within the development site is undertaken to the
satisfaction of the Planning Authority in agreement with the West of Scotland
Archaeology Service. 
Reason
In order to ensure that any historic artifacts located on the site are suitably
catalogued and preserved. 
Condition
12. That prior to the commencement of the development hereby approved, the developer
shall provide full details of the vehicular link to Barga Gardens for the written approval
of North Ayrshire Council as Planning Authority. This shall include an updated
Transportation Assessment which shall include a traffic impact analysis of the
development including the Barga Gardens Road link. Thereafter, the development
shall progress in accordance with such details as may be approved. 
Reason 
In the interest of road safety. 
James Miller 
Chief Planning Officer           
For further information please contact Mr John Mack on 01294 324794.
Appendix 1 – Location Plan           
DO NOT SCALE Reproduced from the Ordnance Survey mapping with the permission of the Controller of Her Majesty’s Stationery
Office © Crown Copyright.  Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings.
North Ayrshire Council Licence Number 100023393. 
29

Page 30

30

Page 31

NORTH AYRSHIRE COUNCIL 
28 September 2022 
Planning Committee
Title: Grouping of Trees adjacent to Wildcat Road and Summerlea
Road, West Kilbride 
Purpose: To seek authority to serve a Provisional Tree Preservation Order
to protect a group of trees at Wildcat Road and Summerlea
Road, West Kilbride
Recommendation: That the Council serves notice of a Tree Preservation Order
(TPO) under S.160 Town and Country Planning (Scotland) Act
1997 and undertakes consultation with all relevant stakeholders. 
1. Executive Summary 
1.1 This report highlights and responds to concerns raised by stakeholders regarding the
importance of a grouping of trees on the northern side of Summerlea Road and on both
sides of the footpath known as Wildcat Road or Wildcat Lane, West Kilbride.   
1.2 It is considered that the trees meet the criteria for a Tree Preservation Order (TPO),
and it is recommended that a TPO is served in the interests of protecting public
amenity.   
2. Background 
2.1 Concerns have been raised from members of the public and a Local Member that trees
located in West Kilbride are under threat from proposed development.  Those
concerned are of the opinion that the trees contribute significantly to public amenity. 
The trees are located on the northern side of Summerlea Road and on both sides of the
footpath known as Wildcat Road or Wildcat Lane.  Those who raised concerns
requested that an assessment be carried out to determine whether the grouping of
trees should be subject to formal protection by a TPO. 
2.2 The Council as the Planning Authority has the power under S.160 of the Town and
Country Planning (Scotland) Act 1997 (as amended by the Planning etc (Scotland) Act
2006 to make an Order specifying any trees, groups of trees or woodlands in their
district and providing for their preservation.  The Council can exercise these powers
providing it meets either or both of the following requirements:
(a) that it is expedient in the interests of amenity to make that provision,
(b) that the trees, groups of trees or woodlands are of cultural or historical
significance.
2.3 It should be noted that under the legislation, a TPO cannot be served due to trees
being at risk alone.  The only two criteria in which a Planning Authority can create a
Agenda Item 4
31

Page 32

provision are the those stated above.   
2.4 The legislation states that a TPO may, in particular, make provision—
a) for prohibiting (subject to any exemptions for which provision may be made by
the order) the cutting down, topping, lopping, uprooting, wilful damage or wilful
destruction of trees except with the consent of the planning authority, and for
enabling that authority to give their consent subject to conditions; 
b) for securing the replanting, in such manner as may be prescribed by or under
the order, of any part of a woodland area which is felled in the course of forestry
operations permitted by or under the order; 
(c)  for applying, in relation to any consent under the order, and to applications for
such consent, any of the provisions of the Town and Country Planning
(Scotland) Act 1997. 
2.5 The Town and Country Planning (Tree Preservation Order and Trees in Conservation
Areas) (Scotland) Regulations 2010 outlines the procedures in which Planning
Authorities can exercise their powers.   If the Council serves a TPO, it is required to be
confirmed within 6 months of the date of that notice.  Within this time, all interested
parties such as Landowners, Occupiers and Lessees must be notified and given a
deadline to respond to the notice of no less than 28 days.  The notice is required to be
advertised locally in the relevant newspapers that serve the area.   
2.6  The six-month period would allow Council to consult with stakeholders and gain
direction from Committee on whether to confirm the TPO (or amend it) and put it in
place in perpetuity.   
2.7 It should be noted that a TPO does not provide absolute protection to all the trees on
the site.  Protection through a TPO places a requirement to obtain permission to cut
down, top, lop, uproot trees from the Council.  Should the removal or any other works
to trees be part of any future planning permission, that permission would then
supersede the TPO.  Should a TPO be created, however, then it would be a material
consideration in the determination of any planning application to which any trees are to
be impacted.   
2.8  Following a preliminary assessment of the trees, it is considered that the trees add to
the Local Landscape Character.  To determine whether it is expedient to create a TPO,
it was considered appropriate to gain independent expert advice.  The advice was also
an opportunity to gain a fuller understanding of the contribution of the trees to public
amenity.   
Independent Report on the Suitability of a Tree Preservation Order 
2.9  Following a procurement process, Informed Tree Services was appointed to undertake
an independent survey on the suitability of a TPO.  The brief instructed the analysis to
how (if at all) the grouping of trees meets the criteria listed under S.160 of the Town
and Country Planning (Scotland) Act 1997.  The two criteria listed are: 
(a) that it is expedient in the interests of amenity to make that provision,
(b) that the trees, groups of trees or woodlands are of cultural or historical significance. 
2.10 The findings of the Independent Report separate the grouping of trees into two
32

Page 33

segments, referred to as compartments. These are made up of: 
• Compartment 1 (approx. area 0.15 ha) - located to the immediate north of
Summerlea Road,
• Compartment 2 (approx. area 0.4 ha)- located on either side of the footpath
referred to as Wildcat Road or Wildcat Lane 
2.11 The survey allowed detailed analysis of the contribution each of these grouping of trees
make as opposed to a general survey of the area.  Each compartment has been
subject to analysis and the Report makes recommendations as to whether they are
worthy of a TPO.  A map showing each compartment can be found in appendix 2,
attached to this paper.  It should be noted that the area shown in the independent
report is different from that shown in Appendix 1 and 2.  The area shown in Appendix 1
and 2 is the proposed boundary for the TPO.   
2.12 The trees were appraised in the week beginning 29th of August 2022 and have been
assessed using nationally recognised systems entitled “The Evaluation Method for
Preservation Orders” (TEMPO) (J. Forbes-Laird, 2006) to rate the appropriateness of
the TPO and “Visual amenity valuation of trees and woodlands – The Helliwell system
2008” (R. Helliwell, 2008).  The latter provides a comparative amenity value to the
protected woodland.  The TEMPO method has the following scoring categories: 
• Do not apply TPO
• TPO indefensible
• Does not merit TPO
• TPO defensible 
• Definitely merits a TPO 
Findings and Recommendations 
2.13 The report scores the compartments as follows:  
• Compartment 1: A TPO would be defensible
• Compartment 2: Definitely merits a TPO 
2.14 Reasons for these scores include that both compartments 1 & 2 are classed as having
“high desirability for retention” and scored highly on the TEMPO evaluation Method for
Preservation Orders.  This report also highlights the positive aspects of the woodland
as being that it provides wildlife habitat opportunities, sequester carbon, provide shade
and shelter, provide privacy/screening and enhance the landscape.  The woodland is
described as an established landscape feature that is viewed by many residential
properties within the West Kilbride area. 
2.15 The report details that compartment 1 is mainly made up of middle-aged and even-
aged belt of multi-stemmed sycamore which are likely to have reached their maximum
height. 
2.16 Compartment 2 is described as a mature broadleaved riparian woodland belt with a
mixture of species including Norway Maple, Sycamore, Horse Chestnut, Silver Birch,
and Turkey Oak to name a few (the full list is contained in the report).   
2.17 It is acknowledged that the advice scores compartment 1 lower than compartment 2. 
This separation is helpful as it broadens the understanding of the grouping.  It is
33

Page 34

considered that in this instance, as the two compartments have relatively high scoring,
they can be assessed as a whole and worthy of protection under a single Tree
Protection Order.   
2.18 The report references the current application for residential development of the site and
suggests that the current proposed development has an impact on the suitability of
creating a TPO.  It is considered that while the proposed development may impact the
expediency of creating the order, the proposal should assess the trees on their own
merit within their existing context.   
2.19 It should be noted (see Para. 2.7) that if planning permission is granted, the permission
would supersede any TPO created and does not mean that affected trees will be
safeguarded in perpetuity.  Should a TPO be created, anyone seeking to do works on
any protected tree would then be required to seek the Council’s permission.   
2.20 The report also suggests that a TPO may not be required if any future planning
consent is subject to carefully worded planning conditions.  It is considered that this is
not a desirable option. 
2.21  An additional consideration is the existence of a core path on Wildcat Road.  While not
a key characteristic of the Core Path, trees can provide shelter and variety to the Core
Path network, adding to the amenity value of the Path and therefore adding to the
wider public interest. 
2.22 At the time of assessment, there was little information regarding the historical or
cultural significance of the trees.  There is some anecdotal information regarding the
use of Wildcat Road as a path is of historical and cultural significance but not
attributing solely to the trees.  Therefore, less attention was afforded to this criterion as
part of the overall assessment as to the suitability of a Tree Protection Order.     
2.23 Taking all the above into consideration, it is considered that the grouping of trees
meets the criteria contained within S.160 of the Town and Country Planning (Scotland)
Act 1997, insofar as (a) that it is expedient in the interests of amenity to make that
provision.   
2.24 Full details of the independent report with scoring can be found in Background Paper 1
of this report.   
3.0 Proposals 
3.1 It is proposed that the Council serves notice of a Tree Preservation Order in line with
the recommendations of the independent report for both Compartments 1 and 2 as a
single TPO with woodland classification.   
3.2  It is proposed that the Council advertise the provisional TPO in local newspaper(s) and
seek the views of stakeholders. Within 6 months of this notice, the Council will consider
views expressed from stakeholders and make a recommendation to the Planning
Committee on whether to confirm or amend the Order.   
4 Implications/Socio-economic Duty
Financial
34

Page 35

4.1   Costs associated with making can be met from existing budgets. 
Human Resources 
4.2   None. 
Legal 
4.3 Should a TPO be confirmed, the owners will be served with a notice meaning that any
work to lop, chop or fell the trees or woodland will require permission of the Council. 
The TPO will be recorded in the appropriate Land Register. 
Equality/Socio-economic 
4.4 Assessments carried out highlight the impact on public amenity.   
Climate Change and Carbon 
4.5 Trees and other green infrastructure contribute positively to the areas ambition to
reduce its contribution to climate change. 
Key Priorities 
4.6  The proposed TPO has the potential to contribute to the Council Plan’s Inspiring Place
Key Outcome.  Trees and other green infrastructure contribute to the creation of welcoming,
vibrant and attractive places.  Trees can also help capture carbon emissions and reduce local
pollution which would otherwise be released into the atmosphere.   
Community Wealth Building 
4.7 None. 
Consultation 
5.1 Consultation is required with landowners, occupiers and lessees and published in a
local paper with at least 28 days given for response. 
JAMES MILLER
CHIEF PLANNING OFFICER 
For further information please contact Thom Ledingham, Planning Officer on 01294 324 623 
Background Papers 
1 -  REPORT ON THE SUITABILITY OF A TREE PRESERVATION ORDER RELATING TO:
SUMMERLEA ROAD & WILDCAT ROAD, WEST KILBRIDE. KA23 9HP. 
35

Page 36

36

Page 37

37

Page 38

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22 Page 1 
REPORT ON THE SUITABILITY
OF A TREE PRESERVATION ORDER
RELATING TO:
SUMMERLEA ROAD & WILDCAT ROAD,
WEST KILBRIDE.
KA23 9HP. 
Ref: NAC/TPO/03.09.22 
Prepared at the request of:
Mr. Thom Ledingham,
Planning Officer,
Strategic Planning,
Economy & Communities,
North Ayrshire Council,
Cunninghame House,
Friars Croft,
Irvine.
KA12 8EE.
Prepared by: 
CHRIS SIMPSON
MICFor, CEnv, F.Arbor.A, MEWI, Dip. Arb (RFS), HND (For), Tech Cert (Arbor.A), Cert Arb (RFS)
Informed Tree Services Ltd, 
67 Buchan Street,
Hamilton.
ML3 8JY.   
Tel: 01698 428603
Mobile: 07881 677813
Email:       informedtree@btinternet.com 
Signed:       __________________________                           3rd of September 2022. 
This report has been prepared exclusively for the use of North Ayrshire Council on the basis of information
supplied, and no responsibility can be accepted for actions taken by any third party arising from their
interpretation of the information contained in this document.  No other party may rely on the report and if he
does, then he relies upon it at his own risk
38

Page 39

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22 Page 2 
CONTENTS 
1. INTRODUCTION & INSTRUCTIONS 
2. DECLARATION 
3. EXECUTIVE SUMMARY 
4. INVESTIGATION FINDINGS 
5. RECOMMENDATIONS 
6. OPINION  
7. BIBLIOGRAPHY 
Appendix 1: Location plan 
Appendix 2: TEMPO forms     
Appendix 3: Helliwell valuation sheet 
Appendix 4: Supporting photographic evidence 
Appendix 5: Glossary of terms 
Annex 1: Proposed development plan 
PAGE 
3
4
5
6
12 
13 
15 
16 
18 
25 
28 
35 
37 
39

Page 40

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22 Page 3 
1 INTRODUCTION & INSTRUCTIONS 
1.1 Following communications received from Mr. Thom Ledingham, of North
Ayrshire Council, during June 2022, a quotation to carry out an evaluation of
the appropriateness of a tree preservation order (TPO) was provided. The
quotation was accepted – official order number received on 22nd of July 2022. 
1.2 Mr. Ledingham forwarded a site plan which clarified the area to be evaluated.1 
1.3 Mr. Ledingham also forwarded a plan of a nearby proposed residential
development.2 Please refer to annex 1. 
1.4 It was agreed that Mr. Chris Simpson, of Informed Tree Services Ltd, would
carry out an objective appraisal of the appropriateness of the TPO using the
nationally recognised system “Tree evaluation method for preservation orders”
(TEMPO) (Forbes-Laird J. 2006). 
1.5 The appraisal was carried out on the 2nd of September 2022, with the aim of
assessing the appropriateness of creating TPO. 
1.6 The author also applied the “Visual amenity valuation of trees and woodlands –
The Helliwell system 2008” (Helliwell R. 2008) to give a comparative “amenity”
value to the woodland. The Helliwell System provides a financial value but is
applied here purely to give a comparative amenity value. 
1 Potential TPO Map (JPEG)
2 PH-SST-V-01 Rev V-Development Layout
40

Page 41

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22 Page 4 
2 DECLARATION 
I, Christopher Brian Simpson, declare that: 
2.1 I understand that my duty in providing this written report is to provide an
objective, unbiased, opinion on the suitability of a potential tree preservation
order. I understand that this duty overrides any obligation to the party who has
commissioned me. I confirm that I have complied with that duty. 
2.2 I believe the facts I have stated in this report are true and that the opinions I
have expressed are correct. 
2.3 I have set out in my report what I understand from those instructing me to be
the issues in respect of which my opinion as an expert is required. 
2.4 I have done my best in preparing this report to be accurate and complete, and I
have mentioned all matters that I regard as relevant to the opinions I have
expressed. 
2.5 I have drawn attention in this report to all facts of which I am aware might affect
my opinion. 
2.6 I have not, without forming my own independent view, included or excluded in
this report anything that has been suggested to me by anyone including those
instructing me. 
2.7 I will notify those instructing me if for any reason this report requires any
correction or qualification. 
2.8 I confirm that I have made clear which facts and matters referred to in this
report are within my own knowledge and which are not. Those that are within
my own knowledge I confirm to be true. The opinions I have expressed
represent my true and complete professional opinions on the matters to which
they refer. 
2.9 I confirm that I have not entered into any arrangement where the amount or
payment of my fees is in any way dependent on the findings of this report. 
Signed:       __________________________            Date:      3rd of September 2022. 
41

Page 42

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22 Page 5 
3 EXECUTIVE SUMMARY 
3.1 North Ayrshire Council had been petitioned to apply a TPO to an area of
woodland adjacent to Wildcat Road and Summerlea Road, West Kilbride, by
Councillor Todd Ferguson, during July 2022. 
3.2 Mr. Chris Simpson, of Informed Tree Services Ltd, was commissioned to
objectively appraise the appropriateness of applying a TPO to the area of
woodland. The appraisal was carried out on the 2nd of September 2022. 
3.3 The “Tree Evaluation Method for Preservation Orders - 2006” (TEMPO) was
adopted. 
3.4 The TPO area displayed two distinct compartments and so each compartment
has been evaluated individually. Results as follow: 
3.5 Compartment 1: “A TPO would be defensible”. 
3.6 Compartment 2: “Definitely merits a TPO”. 
3.7 The “Visual amenity valuation of trees and woodlands – The Helliwell system”
(2008) was also applied. The woodland (collectively) scored 243 points.
Indicating a woodland of moderate to high amenity value. 
3.8 If detailed planning consent is granted for a proposed residential development,
to the immediate north and east of the compartments, then a woodland
category TPO should be applied to each compartment. 
3.9 The TPO plan should be scaled at 1:1’250. 
3.10 The TPO should then be confirmed and registered. 
3.11 If planning consent is not granted, then it would not be expedient to create a
TPO. 
3.12 The trees found within compartment 1 & 2 could be afforded comparable
protection, as that by a TPO, by carefully worded planning conditions –
assuming planning consent is granted. 
42

Page 43

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22 Page 6 
4 INVESTIGATION FINDINGS 
4.1 The woodland appraisal was carried out in clear, bright, dry and warm
conditions. The wind speed was approximately Force 2, (Light Breeze)3. 
4.2 The woodland displays two distinct areas, referred to as compartments.
Compartment 1 is found to the immediate north of Summerlea Road, a quiet
residential, unclassified, public carriageway. It is bordered to the immediate
north by agricultural pasture. 
4.3 Compartment 2 is found to the west of a public right-of-way, referred to as
Wildcat Road, or Wildcat Lane. It is bordered to the west by a narrow stream,
then arable fields. Agricultural pasture is found to the east. The B7048,
Portencross Road, is found to the north. A residential garden, with further
mature woodland, is found to the south. 
4.4 Compartment 1, being directly to the north of properties off Summerlea Road, is
readily viewed by local residents and by those inhabitants of a residential area
of West Kilbride, to the distant north-east, mainly Corsehill Drive. 
4.5 Compartment 2 is readily viewed by the residents of Corsehill Drive, etc., to the
distant east. It borders a public path and so is viewed by those using this route,
and by those traveling along Portencross Road. 
4.6 The two distinct woodland compartments are described below. Please refer to
appendix 1 for the location of each compartment. 
4.6.1 Compartment 1: 
a) Character Statement: Middle-aged and even-aged belt of multi-stemmed
sycamore. 
b) Location: Centre of compartment is found at, X/Y Co-ordinates 219628 –
647972, National Grid Reference NS1962847972, Latitude/Longitude
55.69158, -4.87118. Please refer to appendix 1. 
c) Size: Approximately 0.23 hectares. 
d) BS 5837 Retention Category: A, “high desirability for retention”. 
e) BS 5837 Sub-category: 2 & 3 (mainly landscape and cultural values). 
f) Age Class: Middle-aged. 
g) Safe useful life expectancy (SULE): 40+ years 
3 Beaufort Scale (Met Office)
43

Page 44

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22 Page 7 
h) Species composition: 
Acer pseudoplatanus (sycamore) 
i) Elevation: approximately 10 metres above mean sea level. 
j) Aspect: Arises from moderate south, south-west, facing embankment. 
k) Terrain: Relatively smooth. 
l) Drainage: No drain network observed. No signs of waterlogging observed. 
m) Artefacts: Lampposts. Stock fence along northern boundary. 
n) Access: Readily accessed from Summerlea Road. But no path network
present. 
o) Neighbours: Summerlea Road to the immediate south. Agricultural land to
the north. 
p) Vertical structure: Lacks vertical strata. Even aged and uniform stand
approximately 12 metres tall. 
q) Horizontal structure: Sizeable gaps in the canopy have formed to the
eastern side. Becomes more densely stocked to the west. 
r) Shrub layer: No shrub-layer present. 
s) Field Layer: Consists only of coarse grasses. 
t) General Observations: A stand of stored coppice sycamore. It appears that
many of these multi-stemmed trees have been felled/reduced to near ground
level in the distant past. The lower stems (stools) of some display advanced
decay. Almost all of the sycamore stems are supporting dense ivy (Hedera
helix). Low, squat, specimens have developed due to exposure to the
prevailing wind. They have, likely, already reached their terminal height. All
display normal vitality. All are host to the fungal pathogen tar-spot (Rhytisma
acerinum) – though this disease of the foliage is of little arboricultural
concern. Way-leave marker noted, indicating that underground utilities pass
under the compartment. 
Please refer to appendix 4, photographs 1 & 2 for a view of compartment 1
from the south and west. 
44

Page 45

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22 Page 8 
4.6.2 Compartment 2: 
a) Character Statement: Mature broadleaved riparian woodland belt. 
b) Location: Centre of compartment is found at, X/Y Co-ordinates 219674 –
648227, National Grid Reference NS1967448227, Latitude/Longitude
55.69389, -4.87062. Please refer to appendix 1. 
c) Size: Approximately 0.64 hectares. 
d) BS 5837 Retention Category: A, “high desirability for retention”. 
e) BS 5837 Sub-category: 2 & 3 (mainly landscape and cultural values). 
f) Age Class: Mature, to late-mature. 
g) SULE: 40+ years. 
h) Species composition: 
Acer platanoides (Norway maple)
Acer pseudoplatanus (sycamore)
Aesculus hippocastanum (horse chestnut)
Betula pendula (silver birch)
Crataegus monogyna (hawthorn)
Fagus sylvatica (beech)
Fraxinus excelsior (common ash)
Prunus avium (gean)
Prunus domestica (damson)
Quercus cerris (Turkey oak)
Ulmus glabra (wych elm) 
i) Elevation: approximately 10 metres above mean sea level. 
j) Aspect: Belt displays a gentle west facing slope, to its southern end,
otherwise level. 
k) Terrain: Rough and inaccessible terrain. 
l) Drainage: Woodland is bordered by a main-drain/stream to its western
boundary – a riparian woodland, therefore. No other drain network was
noted. No signs of waterlogging were observed. 
m) Artefacts: Derelict stock fence to the eastern boundary. 
n) Access: An informal access route has been formed to the southern end of
the woodland. Borders a public path but most of the woodland belt is
inaccessible. 
45

Page 46

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22 Page 9 
o) Neighbours: Public path to the immediate east, then agricultural pasture.
Stream to the west, then arable fields. Portencross Road to the immediate
north and a residential woodland garden is found to the immediate south. 
p) Vertical structure: An exposed woodland belt with many trees having
reached their terminal height by approximately 14 metres. Some have
retrenched and are now lower. Varied vertical structure throughout. 
q) Horizontal structure: Varied horizontal structure also, with sizeable gaps
formed by previous tree losses, while other sections are densely stocked. 
r) Shrub layer: Dense and varied understory is found within this woodland belt
and consists of Rubus fruticosus (bramble), Sambucus nigra (elderberry),
Crataegus monogyna (hawthorn), and Prunus domestica (damson). Making a
valuable wildlife corridor. 
s) Field Layer: Limited field layer with coarse grasses and Urtica urens
(nettles). 
t) General Observations: The diverse species composition, varied age-
classes present combined with the varied vertical and horizontal structure
suggests an old, perhaps ancient, woodland belt. Likely a remnant of a wider
network of field-edge hedgerows. Consisting of mainly native broadleaved
species, and bordered by a watercourse, this woodland affords great
ecological benefits. The woodland belt is readily viewed by residents of the
Corsehill Drive area of West Kilbride. It contains at least one completely dead
sycamore specimen, though this poses little perceivable risk of harm while
providing deadwood habitat for invertebrates etc. The common ash
component is succumbing to the ill-effects of Hymenoscyphus fraxineus (ash
die-back disease). Please refer to appendix 4, photograph 6. The more open
sections, where trees have been removed, or have failed, are swamped by
dense brambles. These woody shrubs provide their own ecological benefits
but do suppress the development of replacement trees. The woodland
displays no signs of recent active management but, unfortunately, someone
have seen fit to fly-tip large volumes of green waste/garden waste into the
southern end of the woodland. Depending on the ownership of the woodland,
this may be an illegal activity and it certainly risks introducing diseases and
invasive exotic plant species. Please refer to appendix 4, photograph 5. 
Please refer to appendix 4, photograph 3 for a view of compartment 2, from
the north. 
46

Page 47

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22 Page 10 
4.7 It is understood that a planning proposal for a residential development has been
submitted to North Ayrshire Council. And that the application is under
consideration. A copy of the proposed development’s layout was provided by
Mr. Ledingham.4 While this report is not intended to be a “BS5837:2012 Trees
in relation to design, demolition and construction – Recommendations”
compliant document, it is clear that the proposal includes the construction of
access roads, “pedestrian links”, “SUDS” basin, and residential properties in
close proximity to both woodland compartments. Indeed, it is clear the proposal
would require the removal of some trees – particularly from compartment 1.
Please refer to annex 1. 
4.8 This proposal is mentioned because the creation of a TPO is appropriate when
the planning authority feel “that it is expedient in the interests of amenity to
make that provision”.5 
4.9 The trees within compartments 1 & 2 would be subject to a higher probability of
wilful damage and/or wilful destruction, whether that damage is authorised or
unauthorised. For example, the mature trees found to the north of compartment
2 encroach significantly over the proposed development site. Please refer to
appendix 4, photograph 4. Proposed access roads and paths, as currently
planned, would certainly require the removal of a number of sycamore trees
from compartment 1. And the proposed SUDS basin suggests an anticipated
change in surface-water run-off, due to the impenetrable surfaces created.
Changes in local soil moisture content and run-off of contaminated water often
pose a significant risk to the long term retention of existing trees. 
4.10 It is noted that the development proposal has not followed the recommended
“design and construction process” as laid out in figure 1 of BS5837. If it had
then the proposal would show the desirability for retention of each existing tree,
and its default root protection area. The development would then be designed
with these arboricultural matters in mind. 
4.11 The “Tree Evaluation Method for Preservation Orders (TEMPO)” was applied to
determine the appropriateness of a TPO. TEMPO applies scores to amenity
value, likely retention span, visibility, other factors and expediency. The final
score can then be used to determine whether the TPO is merited, defensible or
indefensible. A summary of each compartment’s score is listed below. Full
details/workings may be viewed at appendix 2. 
Cont... 
4 PH-SST-V-01 Rev V-Development Layout (PDF)
5 Town & Country Planning (Scotland) Act 1997. Section 110 1A (a)
47

Page 48

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22 Page 11 
Compartment 1 Compartment 2
Factor Score Score
Condition 3 3
Retention span 4 4
Relative public visibility 3 4
Other factors 1 3
Expediency 3 3
Total 14 17
Decision TPO defensible Definitely merits TPO 
4.12 The Helliwell “Evaluation method for woodlands” was also applied to the TPO
area. This method uses a range of scores (from 0.5 to 4) to calculate the
amenity value of the woodland, over six criteria. I scored the woodland at 243
points. Points allocated as follows: 
Factor Points allocated 
1) Size of woodland 1.5
2) Position in landscape 2
3) Viewing population 3
4) Presence of other trees and woodland in the
vicinity
3
5) Composition and structure of woodland 3
6) Compatibility 3
TOTAL (scores multiplied) 243 
4.13 The monetary value for woodland is £171.87 per point (until the end of 2022).
Making the amenity value of the woodland, £41’764.41. This figure is only
mentioned to allow comparison of another method for the evaluation of amenity
value. At 243 points awarded, the TPO area is of moderate to high amenity
value. The lowest possible score is 0.03125, with the highest being 3’072. 
Please refer to appendix 3 for details and workings associated with the above
calculation. 
48

Page 49

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22 Page 12 
5 RECOMMENDATIONS 
5.1 The potential TPO area was broken down into two distinct compartments. Each
compartment was evaluated in its own right. Conclusions as follows: 
5.2 Compartment 1, a TPO would be defensible. 
5.3 Compartment 2 definitely merits a TPO. 
5.4 If detailed planning consent is granted for the development as shown on the
site plan provided, then a woodland TPO should be created and confirmed. Or
carefully worded planning conditions should be applied that protect the trees
within these two compartments. 
5.5 The TPO map (a schedule 1) should be drawn at a scale of 1:1’250. 
5.6 The TPO should be of a “woodland” designation. 
5.7 The TPO map should, therefore, highlight the protected woodland with a
“continuous red line”. 
5.8 The TPO should then be confirmed and recorded with the appropriate Register
of Sasines or registered with the Land Register of Scotland. 
5.9 The TPO should be reviewed from ‘time to time’. Once every five years is
suggested. 
5.10 The ownership of the compartments should be determined. Assuming the
woodland referred to as compartment 2 is not owned by local residents, then
they (the residents of Summerlea Road) should be strongly advised to not tip
waste into the woodland. 
5.11 The proposer of the residential development should ensure that they carefully
follow the staged “design and construction process” as laid out in figure 1 of
BS5837, in future. 
5.12 North Ayrshire Council should not consider/process planning proposals that
have not followed the BS5837 “design and construction process”. 
49

Page 50

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22 Page 13 
6 OPINION 
6.1 On arrival at Summerlea Road it quickly became apparent that the ‘woodland’
to be evaluated is formed by two distinct broadleaved belts. Therefore, I felt it
appropriate to rate the two compartments separately. 
6.2 Compartment 1 is a narrow belt of multi-stemmed sycamores that arise close to
Summerlea Road and close to the proposed residential development. 
6.3 Compartment 2 is somewhat more removed from the proposed development,
being isolated from the field by a metaled path. Compartment 2 displays an
impressive range of native, naturalised and exotic broadleaved tree species.
The range of tree species, sizes and conditions, combined with the woodland’s
position adjacent to a historic road/route strongly suggests a woodland of great
age. 
6.4 The two compartments provide various socioeconomic benefits. They provide
wildlife habitat opportunities, sequester carbon, provide shade and shelter,
provide privacy/screening and enhance the landscape. These established
landscape features are viewed by many residential properties within the West
Kilbride area. As such, both compartments are worthy of retention. 
6.5 So, the trees provide tangible and/or intangible benefits to the public – they
have amenity value. They also have historic and cultural value, particularly
compartment 2. But a TPO should only be applied when it is expedient to do so.
This would suggest that their needs to be a reasonably perceivable threat to the
long-term survival of the subject tree, or trees.   
6.6 It is my experience that new residential properties, in close proximity to existing
trees, does indeed, inevitably, result in predictable and continual pressures on
those trees. Compartment 1 & compartment 2 are found to the immediate south
and west of several of the proposed homes. They will cast significant shade
over gardens and windows, especially in the evenings. This alone is likely to
result in residents seeking tree reductions and removals. Several homes and
gardens are planned in close proximity to existing canopies. Where these tree
canopies encroach private property, the residents will be intitled to ‘abate a
nuisance’, regardless of a TPO being in place, or not. And some trees are
simply incompatible with the proposed development and will require removal.
For these reasons it is reasonable to perceive a threat to the long term survival
of at least some of the trees present. 
6.7 It should be noted that retained trees, after detailed planning consent has been
granted, may be protected by carefully worded planning conditions, rather than
the creation of a TPO. And a TPO does not mean that planning consent cannot
be provided, and selected trees approved for removal. 
Cont...
50

Page 51

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22 Page 14 
6.8 A local planning authority has a challenging role in an instance such as this.
The amenity, cultural and historic value of the woodland must be balanced with
the authority’s responsibility to encourage suitable proposals for the much
needed expansion of suitable housing. In this instance I feel all trees within the
two compartments could easily be retained, with some slight adjustments of the
proposed development’s footprint. 
6.9 It should be noted that if the proposed development is not granted detailed
planning consent, then it would likely no longer be expedient to apply a TPO, as
there would be no increased threat to the trees’ survival. 
6.10 If a TPO is applied, it should be of a ‘woodland’ classification. This category of
TPO best protects trees, of all sizes and ages, in the longer term. 
51

Page 52

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22 Page 15 
7 BIBLIOGRAPHY 
FORBES-LAIRD J. (2006)  Tree Evaluation Method For
Preservation Orders – Guidance
Note For Users. 
DUNSTER J.A. (2017)
International Society of Arboriculture 
Tree Risk Assessment Manual
(second edition).
HELLIWELL R. (2008)
Arboricultural Association 
Principles of tree hazard
assessment and management.
SCOTTISH GOVERNMENT (2011) Scottish Planning Series. Planning
Circular 1 2011. Tree Preservation
Orders. 
BRITISH STANDARD INSTITUTE (2012)
BSI, 2 Park Street, London 
“BS 5837:2012 Trees in relation to
design, demolition & construction -
Recommendations”. 
52

Page 53

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22 Page 16 
APPENDIX 1 
LOCATION PLAN6 
6 Plan not to scale.
53

Page 54

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22 Page 17 
54

Page 55

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22 Page 18 
APPENDIX 2 
TEMPO FORMS 
55

Page 56

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22
Page 19 
TREE EVALUATION METHOD FOR PRESERVATION ORDERS (TEMPO)
SURVEY DATA SHEET & DECISION GUIDE 
Date of inspection: 2nd of September 2022
Surveyor:  Chris Simpson
TPO Ref:  No order had been applied at the time of inspection. 
Compartment Number: Compartment 1
Owner:  Unknown (by author)
Location:  “West Kilbride, North Ayrshire. KA23 9HP. Woodland belt
found to the immediate north of Summerlea Road then running south to north,
to the B7048”. 
Part 1: Amenity assessment
a) Condition & suitability for TPO
5) Good   Highly suitable
3) Fair    Suitable
1) Poor   Unlikely to be suitable
0) Dead   Unsuitable
0) Dying/dangerous7 Unsuitable 
SCORE:  3 
NOTES:  This southern belt arises to the immediate north of Summerlea
Road. A narrow belt on a south-facing embankment dominated by young multi-
stemmed sycamore. Readily viewed by residents to the south and by residents
of the wider West Kilbride area, to the distant north-east. A useful screen. 
b) Retention span (in years) & suitability for TPO
5) 100+   Highly suitable
4) 40-100   Very suitable
2) 20-40   Suitable
1) 10-20   Just suitable
0) <108   Unsuitable
0) Dying/dangerous9 Unsuitable 
SCORE:  4  (running total = 7) 
NOTES: This woodland belt is formed entirely by sycamore specimens.
This disease resistant naturalised species can reasonably be anticipated to
survive another 40 to 100 years. 
7 Relates to existing context and is intended to apply to severe irremediable defects only
8 Includes trees which are an existing or near future nuisance, including those clearly outgrowing their current
context, or which are significantly negating the potential of trees of better quality.
9 Relates to existing context and is intended to apply to severe irremediable defects only
56

Page 57

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22
Page 20 
c) Relative public visibility & suitability for TPO (consider realistic
potential for future visibility with changed land use).
5) Very large trees with some visibility, or prominent large trees 
Highly suitable
4) Large trees, or medium trees clearly visible to the public 
Suitable
3) Medium trees, or large trees with limited view only   
Suitable
2) Young, small, or medium/large trees visible only with difficulty 
Barely suitable
1) Trees not visible to the public, regardless of size           
Probably unsuitable 
SCORE: 3  (running total = 10) 
NOTES: The belt of relatively squat sycamore specimens are readily viewed
by residents of Summerlea Road and by the residents of properties found to
the north-east, as well as road-users and walkers. 
d) Other factors (trees must have accrued 7 or more points (with no zero
score) to qualify)
5) Principal components of arboricultural features, or veteran trees
4) Tree groups, or members of groups important for their cohesion
3) Trees with identifiable historic, commemorative or habitat importance
2) Trees of particularly good form, especially if rare or unusual
1) Trees with none of the above additional redeeming features 
SCORE: 1  (running total = 11) 
NOTES: The young multi-stemmed, squat, sycamore trees have no other
redeeming arboricultural features. 
Part 2: Expediency assessment (Trees must have accrued 9 or more points
to qualify).
5) Immediate threat to tree
3) Foreseeable threat to tree
2) Perceived threat to tree
1) Precautionary only 
SCORE: 3 (running total = 14) 
NOTES: A planned residential development to the immediate north will
inevitably lead to soil disturbance within the trees’ predictable rooting area,
alter soil moisture content and increase the probability of authorised, and
unauthorised, pruning and felling. 
57

Page 58

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22
Page 21 
Part 3: Decision guide
Any 0  Do not apply TPO
1-6  TPO indefensible
7-10  Does not merit TPO
11-14  TPO defensible
15+  Definitely merits TPO 
ADD SCORES FOR TOTAL: 14 
DECISION:   A TPO for Compartment 1 would be defensible. 
Cont...
58

Page 59

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22
Page 22 
TREE EVALUATION METHOD FOR PRESERVATION ORDERS (TEMPO)
SURVEY DATA SHEET & DECISION GUIDE 
Date of inspection: 2nd of September 2022
Surveyor:  Chris Simpson
TPO Ref:  No order had been applied at the time of inspection. 
Compartment Number: Compartment 2
Owner:  Unknown (by author)
Location:  “West Kilbride, North Ayrshire. KA23 9HP. Woodland belt
found to the immediate north of Summerlea Road then running south to north,
to the B7048”. 
Part 1: Amenity assessment
e) Condition & suitability for TPO
5) Good   Highly suitable
3) Fair    Suitable
1) Poor   Unlikely to be suitable
0) Dead   Unsuitable
0) Dying/dangerous10 Unsuitable 
SCORE:  3 
NOTES:  This western woodland belt arises to the immediate west of a
public right-of-way. With arable fields to the east and west it is readily viewed
by of the wider West Kilbride area, to the distant north-east. 
f) Retention span (in years) & suitability for TPO
5) 100+   Highly suitable
4) 40-100   Very suitable
2) 20-40   Suitable
1) 10-20   Just suitable
0) <1011   Unsuitable
0) Dying/dangerous12 Unsuitable 
SCORE:  4  (running total = 7) 
NOTES: This woodland belt is formed by a variety of broadleaved species,
including sycamore, common ash, Turkey oak, gean, silver birch, damson,
hawthorn, horse chestnut and beech. It displays gaps in the canopy where
older trees have failed or have been removed. These open areas are typically
covered in dense bramble. The woodland belt displays a varied vertical
structure – younger trees are found below the canopies of older trees, thus
helping ensure continued canopy cover for a conservative estimate of 40 to
100 years. 
10 Relates to existing context and is intended to apply to severe irremediable defects only
11 Includes trees which are an existing or near future nuisance, including those clearly outgrowing their current
context, or which are significantly negating the potential of trees of better quality.
12 Relates to existing context and is intended to apply to severe irremediable defects only
59

Page 60

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22
Page 23 
g) Relative public visibility & suitability for TPO (consider realistic
potential for future visibility with changed land use)
5) Very large trees with some visibility, or prominent large trees 
Highly suitable
4) Large trees, or medium trees clearly visible to the public 
Suitable
3) Medium trees, or large trees with limited view only   
Suitable
2) Young, small, or medium/large trees visible only with difficulty 
Barely suitable
1) Trees not visible to the public, regardless of size           
Probably unsuitable 
SCORE: 4  (running total = 11) 
NOTES: This woodland belt, despite being somewhat squat (exposed to the
prevailing wind) contains some large diameter broadleaved specimens that
combine to create a major landscape feature, viewed by residents of West
Kilbride (to the north-east) and by road-users. 
h) Other factors (trees must have accrued 7 or more points (with no zero
score) to qualify)
5) Principal components of arboricultural features, or veteran trees
4) Tree groups, or members of groups important for their cohesion
3) Trees with identifiable historic, commemorative or habitat importance
2) Trees of particularly good form, especially if rare or unusual
1) Trees with none of the above additional redeeming features 
SCORE: 3  (running total = 14) 
NOTES: This mature woodland belt is found along the edge of a historic right-
of-way and contains several mature, to late-mature specimens – suggesting a
woodland of great age. Formed by mainly native broadleaved species. 
Part 2: Expediency assessment (Trees must have accrued 9 or more points
to qualify)
5) Immediate threat to tree
3) Foreseeable threat to tree
2) Perceived threat to tree
1) Precautionary only 
SCORE: 3 (running total = 17) 
Cont...
60

Page 61

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22
Page 24 
NOTES: A planned residential development to the immediate east will
inevitability lead to soil disturbance within the trees’ predictable rooting area,
alter soil moisture content and increase the probability of authorised, and
unauthorised, pruning and felling. It should be noted that the canopies several
trees, to the north of this belt, display significant encroachment of the proposed
development site. 
Part 3: Decision guide
Any 0  Do not apply TPO
1-6  TPO indefensible
7-10  Does not merit TPO
11-14  TPO defensible
15+  Definitely merits TPO 
ADD SCORES FOR TOTAL: 17 
DECISION:    Compartment 2 definitely merits a TPO. 
61

Page 62

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22
Page 25 
APPENDIX 3 
HELLIWELL VALUATION SHEET 
62

Page 63

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22 Page 26 
HELLIWELL ‘EVALUATION METHOD FOR WOODLANDS’13
CALCULATIONS RELATING TO TPO AREA
FACTOR POINTS 
0.5 1 2 3 4 SCORES & NOTES
1. Size of woodland  Very small Small Medium Large Compartment 1 is
approximately 0.23 Ha.
Compartment 2 is
approximately 0.64 Ha.
So, scores 1.5
2. Position in
landscape
Very secluded Secluded Visible but
not
prominent
prominent Very
Prominent
Visible for more than 1
Kilometre. Non-
prominent woodland so
scores 2.
3. Viewing
population
Very few Few Some Many Very many Woodland viewed by
’many’ residents and by
road users and
pedestrians. Scores 3.
4. Presence of
other trees and
woodland in the
vicinity
Surrounding
area more than
75% wooded
Surroundin
g area
more than
25%
wooded
Surrounding
area 5-25%
wooded
Surrounding
area 1-5%
wooded
Surrounding
area less
than 1%
wooded
Surrounding area with
no more than 5%
woodland cover. So,
scores 3. 
13 Full guidance notes relating to the scoring regime can be read in “Visual amenity valuation of trees and woodlands. The Helliwell System 2008”.  Guidance note 4 from
the Arboricultural Association.
63

Page 64

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22 Page 27 
HELLIWELL ‘EVALUATION METHOD FOR WOODLANDS’14
CALCULATIONS RELATING TO TPO AREA
FACTOR POINTS 
0.5 1 2 3 4 SCORES & NOTES
5. Composition and
structure of the
woodland
Plantation with
geometric
stripes, or
visually
degraded
woodland
Even-aged
young
woodland
Mature or
uneven-aged
woodland or
wood
pasture
Mature or
uneven-aged
woodland or
wood
pasture with
large or
veteran
trees 
Compartment 1 is even
aged and middle-aged
but compartment 2 is
mature and un-even
aged. So, scores 3.
6. Compatibility Only just
acceptable
Acceptable Moderately
good
Good Excellent Woodland is an
established feature
within an agricultural
setting – good
compatibility. So,
scores 3.
TOTAL 243 
14 Full guidance notes relating to the scoring regime can be read in “Visual amenity valuation of trees and woodlands. The Helliwell System 2008”.  Guidance note 4 from
the Arboricultural Association.
64

Page 65

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22
Page 28 
APPENDIX 6 
SUPPORTING PHOTOGRAPHIC EVIDENCE 
65

Page 66

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22
Page 29 
Photograph 1 
Above: Compartment 1 as seen from the south. Note the properties in the
distance, with an uninterrupted view of this woodland belt. 
66

Page 67

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22
Page 30 
Photograph 2 
Above: Compartment 1, as seen from the west. Note the distinct gap
between the two compartments, created by the public footpath. 
67

Page 68

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22
Page 31 
Photograph 3 
Above: Compartment 2, as seen from the north. Note the fragmented
nature of the woodland 
68

Page 69

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22
Page 32 
Photograph 4 
Above: The northern end of compartment 2. The canopies found here
encroach over the field to the east, the proposed development site. 
69

Page 70

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22
Page 33 
Photograph 5 
Above: The southern end of compartment 2. Large volumes of green
waste are being dumped within the woodland. 
70

Page 71

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22
Page 34 
Picture 6 
Above: The common ash trees found within compartment 2 are
succumbing to the ill-effects of ash die-back disease.   
71

Page 72

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22
Page 35 
APPENDIX 4 
GLOSSARY OF TERMS 
72

Page 73

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22
Page 36 
Glossary of Arboricultural Terms: 
Term Explanation
Amenity value The tangible and intangible benefits afforded by trees to
the public. 
Coppice Silvicultural technique where the tree is repeatedly cut-
back to a stool. 
Native Tree species native to the British Isles. 
Naturalised Tree species introduced to the British Isles but now forming
wild populations. 
Riparian
woodland
Woodland bordering aquatic features. Commonly accepted
to increase the ecological value of a woodland. 
Stool Coppiced tree stump.
Stored coppice Coppiced stems that are retained beyond a standard cycle
of cutting. 
Tree Any woody perennial that would normally be referred to as
a tree. 
73

Page 74

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22
Page 37 
ANNEX 1 
PROPOSED DEVELOPMENT LAYOUT 
74

Page 75

Evaluation of preservation order report for North Ayrshire Council. Prepared by Informed Tree Services Ltd. Sept 2022. Ref: NAC/TPO/03.09.22
Page 38 
75

Page 76

NORTH AYRSHIRE COUNCIL 
28th September 2022 
Planning Committee 
Title:    Notice under Section 179 of the Town and Country
Planning (Scotland) Act 1997: former dental surgery,
Fergushill Road, Kilwinning, Ayrshire, KA13 7LR 
Purpose:  To seek authority to serve a notice under Section 179 of the
Town and Country Planning (Scotland) Act 1997 to both secure
the building and to maintain the curtilage of the former dental
surgery building on Fergushill Road, Kilwinning. 
Recommendation:  Agree that authority by given to serve a Notice under Section
179 of the Town and Country Planning (Scotland) Act 1997 in
the interests of the amenity of the area 
1. Executive Summary 
1.1 To seek authority to serve a notice under Section 179 of the Town and Country Planning
(Scotland) Act 1997 to both secure the building and to maintain the curtilage of the
former dental surgery building on Fergushill Road, Kilwinning. 
1.2 The former dental surgery building is currently vacant, has been subject to previous
break-ins, and has deteriorated in appearance in recent years. It is considered that the
condition of the land and the vacant building is harmful to the amenity of the surrounding
area on Fergushill Road and poses a safety risk to neighbouring residents. 
1.2 Complaints were received by Planning Services raising concerns about the condition
of the building and site. Officers inspected the site and contacted the owner to raise
these concerns. No response has been received to the most recent contacts. 
2. Background 
2.1 Complaints regarding the condition of the former dental surgery building at Kilwinning
Clinic on Fergushill Road in Kilwinning were received by Planning Services on the 20th
of June 2022. It was reported that the building was not secure and had been subject
to issues involving smashed windows and fire-raising. On the 26th of August 2022,
further complaints were received that there was a missing panel to the building door
which was allowing continued access to the building without restriction. 
Agenda Item 5
76

Page 77

2.2 Planning permission was granted in February 2021 (ref. 21/00019/PP) for the
demolition of the vacant dental surgery building and the erection of six semi-detached
dwellinghouses to include the formation of access road/parking and provision of
garden ground/landscaping. The development has neither commenced nor has any
site clearance been initiated. 
2.4 It is considered that the condition of the land and the vacant building is harmful to the
amenity of the surrounding area on Fergushill Road and poses a safety risk to
neighbouring residents. The building is not secure and has been subject to previous
break-ins and its fabric has deteriorated in recent years. 
2.5 A previous complaint regarding the condition of the building was received by Planning
Services in July 2021. Given the above noted planning permission (ref. 21/00019/PP),
the applicant/owner was asked to provide a timescale for the implementation of the
permission and the demolition of the vacant building. In response the applicant/owner
advised that he was awaiting the approval of a Building Warrant to commence the
works. 
2.6 The Council’s Building Standards Team advise that a Building Warrant was granted in
February 2021 to the previous owner for the demolition of the building (ref.
20/00682/BW), which remains valid until 9th February 2024. There is no record of an
application for a Building Warrant for the proposed development by the current owner.
There has been no further indication from the owner as to when the planning permission
(ref. 21/00019/PP) is to be implemented nor when demolition works are due to
commence. 
2.5 It is therefore considered necessary to serve a notice under Section 179 of the Town
and Country Planning (Scotland) Act 1997 on the owner of the land to require enhanced
security measures and to improve the external appearance of the former dental surgery
building and its curtilage.  
3. Proposals 
3.1 It is recommended that a Notice under Section 179 of the Town and Country Planning
(Scotland) Act 1997 (as amended) is served on the landowner to require: 
1. The securing of all doors and windows and other entry points into the vacant
former dental surgery building by boarding up all openings; and
2. The removal of graffiti, litter, broken glass, and damaged signs from the site. 
3.2 The timescale for undertaking such works should be no greater than 6 weeks from
the date of the notice. 
4. Implications/Socio-economic Duty 
Financial 
77

Page 78

4.1 Should any requirement of the Notice not be complied with following expiry of the
compliance period, the Council as planning authority may enter the land and carry out such
steps to achieve compliance. The Council may then seek to recover from the person(s)
who was the then owner (or lessee) any expenses reasonably incurred during the carrying
out of these works. 
Human Resources 
4.2 None. 
Legal 
4.3 The proposed Amenity Notice would be served in accordance with statutory
procedures. 
Equality/Socio-economic 
4.4 None. 
Environmental and Sustainability 
4.5 The proposed Amenity Notice would restore and maintain the amenity of the
surrounding area in Kilwinning to an expected condition. 
Key Priorities 
4.6 The proposed Amenity Notice would support the Council Plan priority: “Vibrant,
welcoming and attractive places” 
Community Wealth Building 
4.7 Any direct action taken under the Planning Acts can support progressive procurement. 
5. Consultation 
5.1 None. 
JAMES MILLER
Chief Planning Officer 
For further information please contact Mr J. Thompson, Assistant Planning Officer, on
01294 324313. 
Background Papers
0
78

Page 79

$+
$+
$+
$+
$+$+$+ $+
Resource Centre
BURNS
FERGUSHILL ROAD
BRIDGEND LANE
Dental Centre
MILLSIDE GARDENS
1
3 to
9
8
40
14
24
26
CR
9.1m
6
16.5m
4
P
21 to 31
33 to 43
Garage
12
38
11
11.9m
5
7
The Bungalow
Sunnyhill
Braemar
Eilden
Springfield
Hillcrest
14
1
4
11
®
0 30 6015 Metres
1:1,250
Notice under Section 179 of the Town and Country
Planning (Scotland) Act 1997: Kilwinning Clinic,
Fergushill Road, Kilwinning, Ayrshire, KA13 7LR
"This map is reproduced from the OS map by North Ayrshire Council with the permission of the Controller of Her Majesty's Stationery Office, © Crown
copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. Licence Number: 100023393."
79