Democracy Spraffa

Saltcoats - Site to North of St Andrews Court 2200420PPM

North Ayrshire Council · 28 September 2022
Back to Planning Committee — 28 September 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Some pages contain no extractable text. They may be blank, graphics or scanned pages. OCR has not been applied.

Page 1

NORTH AYRSHIRE COUNCIL 
Planning Committee 
Locality  Three Towns
Reference 22/00420/PPM
Application Registered 10th June 2022
Decision Due 10th October 2022
Ward Saltcoats And Stevenston 
Recommendation  Approved subject to Conditions 
__________________________________________________________________ 
Location  Site To North Of St Andrews Court Saltcoats Ayrshire 
Applicant  Persimmon Homes And Land Partners (Scotland)
Limited 
Proposal  Erection of 99 dwelling houses
___________________________________________________________________ 
1. Description 
The application site is a 3.4ha greenfield site to the north of Saltcoats. It is located to the
north of existing residential areas at St Andrews Court/Clytus Court/Betsy Miller Wynd and
to the west of the previous phase of the Sharphill housing development which is currently
under construction. To the north and west of the site are open agricultural fields. The site is
open in character with gentle slopes and the site is bisected diagonally by a hedgerow which
follows the line of a field drainage ditch. 
It is proposed to erect a residential development comprising of 99 units and associated
infrastructure on the site. The proposed layout would feature two points of vehicular access,
one from Sharphill Phase 2C to the east and one from Braga Gardens to the south. In
addition, there would be a road link provided for a potential future development to the west.
Internally, the road layout would consist of a main east-west through road with a secondary
residential street to the north. The existing field drainage ditch would be diverted to the north
of the site. A SuDs basin would be located in the western corner of the site along with a
pumping station. A small area of open space would be provided in the eastern portion of the
site.

Page 2

Sixteen different house types are proposed. The development would be made up of
detached, semi-detached, and terraced houses with 2-4 bedrooms. All houses would be two
storeys (with some having additional living space in the attic) would feature a gabled roof
design. Finishing materials would be facing brick, render and concrete roof tiles. Some
houses would be full brick whereas others would be half brick half render. Some house
types would feature integral garages. All houses would feature photovoltaic panels on the
roof. 
In the adopted Local Development Plan (LDP) the site lies within a General Urban Area
allocation. The following policies would apply to the development:  
- The Towns and Villages Objective of Strategic Policy 1: Spatial Strategy;
- Strategic Policy 2: Placemaking;
- Policy 1: New Homes and Maintaining an Effective Housing Land Supply;
- Policy 22: Water Environment Quality;
- Policy 23: Flood Risk Management; 
- Policy 27: Sustainable Transport and Active Travel;
- Policy 29: Energy Infrastructure Developments; and
- Policy 31: Future Proofing for Heat Networks. 
Planning Permission in Principle for a mixed-use development including residential at
Sharphill was granted subject to conditions 18th March 2015 (ref: 14/00626/PPPM). Since
then, approval of some matters specified in those conditions has been granted. On the 2nd
of March 2017, permission for the construction of a distributor access road through the site
was approved as Phase 1 of the development (ref: 16/01232/MSCM). 
In December 2018, a Matters Specified in Condition application was approved for the
erection of 95 dwellinghouses on the site to the north Of Meikelaught Place and west of
Windmill Wynd (18/00940/MSCM). This constitutes Phase 2A of the development. Also
approved in December 2018 was Phase 2B which consist of the erection 76 dwellinghouses
for social rent to the east of Phase 2A and south of the Sharphill industrial estate
(18/00934/MSCM). Phase 2C of the development was approved in May 2021 and consist of
a further 41 houses (21/00074/PP). Phases 2A, 2B have been mostly completed and phase
2C is currently under construction. 
The current application site lies outwith the site of the approved Planning Permission in
Principle for Sharphill (14/00626/PPPM), however, it makes up part of the larger Sharphill
site and is designated in the LDP as 'West of Sharphill'. The applicant submitted the
Proposal of Application Notice (PAN) in February 2022 (22/00086/PREAPM). The applicant
has also submitted an Environmental Impact Assessment (EIA) Screening Opinion
(22/00452/EIA). The Council has confirmed that an EIA is not required. The applicant
signed a Processing Agreement with The Council on the 10th June 2022. 
Since the original submission, the Case Officer has secured design improvements to the
layout to reorientate a number of the houses so that they would face onto the street. The
vehicle link to Barga Gardens has also been confirmed. A request to create an additional
vehicle or pedestrian link to the north in the interest of future planning was not achieved as
the entire length of the northern boundary of the site is occupied by the diverted drainage
ditch or steep topography. 
Supporting Information:

Page 3

Design and Access Statement:
The primary vehicle route will run through the development and link with the Phase 2C to the
east as well as providing a link to a future development to the west. The re-routed drainage
channel has been incorporated into the open space strategy for the development. The
proposed house types are in-keeping with the existing housing being built at Sharphill. It is
considered that the proposed development accords with the relevant LDP policies as well
as with Designing Streets and Designing Places. 
Pre-Application Consultation Report:
An advert was placed in the Ardrossan and Saltcoats Herald on the 23rd March 2022 to
advertise the online public consultation event which was held on the 14th of April. A website
was created to display information about the proposed development. There is not an active
Community Council in Saltcoats. A copy of the Pan was sent to all local councillors in the
Saltcoats ward. The online event was attended by 2 people. No comments were received. 
Air Quality Impact Assessment:
The site is not located within an Air Quality Management Area. It is concluded that the
qualitative phase dust risk assessment demonstrates that the potential effects for air quality
at sensitive receptors are not considered to be significant and that a detailed Air Quality
Impact Assessment is not required. 
Ecological Report:
The habitats on the site include scattered scrub, broadleaved parkland/scattered trees,
semi-improved natural grassland, improved grassland and eutrophic running water. No
evidence of protected species or habitats were recorded during the survey. Five nests were
found in the scattered trees on the permitter of the fields two of which were determined to be
active. If work is undertaken during the bird nesting season only sections of the site more
than 10m in distance from the active nests should be allowed to be developed. It is
recommended that a bird breeding survey is undertaken to determine which nests are
active. If any trees are scheduled to be felled it is advised that a preliminary roost
assessment is undertaken to determine if any bat roosts are present. 
Flood Risk Assessment: 
The closest watercourse is the Stanley Burn approx. 600m to the west of the site. The site is
not at risk of fluvial flooding from this watercourse. There are a number of land drains that
run through or near the site, the largest being one running along the western boundary. A
minor drain runs diagonally through the site along a hedgerow. There should be no
development within 3m of the drain along the western edge of the site. 
Site Investigation Report:
The site is not located in an area of known mining activity and no records of coal mining
have been found. The site has been occupied by agricultural land throughout its history and
therefore it is not considered likely that there is any significant chemical contamination. No
invasive plant species were found.   
Transport Assessment:
The proposed development would tie in with the existing footpath network. It is located
850m from the nearest shop and 650m from the nearest primary school. The development
is located within 1,600m of local facilities and amenities and is therefore considered in
accordance with transport planning policy. There are no dedicated cycle routes around the

Page 4

development. The nearest bus stops to the proposed development are on Burns Avenue
near Fleming Crescent (approx. 400m from the site) which provides a link to Saltcoats town
centre and Stevenston. Both Saltcoats and Ardrossan South beach railway stations are
located approx. 2,500m from the site (approx. 30 mins walk). Traffic surveys were carried
out on nearby junctions. The junctions would operate efficiently within their capacity with the
addition of the traffic from the proposed development. 
Relevant Development Plan Policies 
SP1 - Towns and Villages Objective
Towns and Villages Objective 
Our towns and villages are where most of our homes, jobs, community facilities, shops and
services are located. We want to continue to support our communities, businesses and
protect our natural environment by directing new development to our towns and villages as
shown in the Spatial Strategy. Within urban areas (within the settlement boundary), the LDP
identifies town centre locations, employment locations and areas of open space. Most of the
remaining area within settlements is shown as General Urban Area. Within the General
Urban Area, proposals for residential development will accord with the development plan in
principle, and applications will be assessed against the policies of the LDP. New
non-residential proposals will be assessed against policies of this LDP that relate to the
proposal. 
In principle, we will support development proposals within our towns and villages that: 
a) Support the social and economic functions of our town centres by adopting a town
centre first principle that directs major new development and investment to town
centre locations as a priority including supporting town centre living.
b) Provide the right new homes in the right places by working alongside the Local
Housing Strategy to deliver choice and variety in the housing stock, protecting land
for housing development to ensure we address housing need and demand within
North Ayrshire and by supporting innovative approaches to improving the volume
and speed of housing delivery.
c) Generate new employment opportunities by identifying a flexible range of business,
commercial and industrial areas to meet market demands including those that would
support key sector development at Hunterston and i3, Irvine.
d) Recognise the value of our built and natural environment by embedding placemaking
into our decision-making. 
e) Prioritise the re-use of brownfield land over greenfield land by supporting a range of
strategic developments that will deliver:
o regeneration of vacant and derelict land through its sustainable and productive
re-use, particularly at Ardrossan North Shore, harbour and marina areas,
Montgomerie Park (Irvine) and Lochshore (Kilbirnie).
o regeneration and conservation benefits, including securing the productive re-use of
Stoneyholm Mill (Kilbirnie) and supporting the Millport Conservation Area
Regeneration Scheme.
f) Support the delivery of regional partnerships such as the Ayrshire Growth Deal in
unlocking the economic potential of the Ayrshire region.

Page 5

Strategic Policy 2
Placemaking
Our Placemaking policy will ensure we are meeting LOIP priorities to make North Ayrshire
safer and healthier by ensuring that all development contributes to making quality places.
The policy also safeguards, and where possible enhances environmental quality through
the avoidance of unacceptable adverse environmental or amenity impacts. We expect that
all applications for planning permission meet the six qualities of successful places,
contained in this policy. This is in addition to establishing the principle of development in
accordance with Strategic Policy 1: Spatial Strategy. These detailed criteria are generally
not repeated in the detailed policies section of the LDP. They will apply, as appropriate, to all
developments. 
Six qualities of a successful place 
Distinctive
The proposal draws upon the positive characteristics of the surrounding area including
landscapes, topography, ecology, skylines, spaces and scales, street and building forms,
and materials to create places with a sense of identity. 
Welcoming
The proposal considers the future users of the site and helps people to find their way
around, for example, by accentuating existing landmarks to create or improve views
(including sea views), locating a distinctive work of art in a notable place or making the most
of gateway features to and from the development. It should also ensure that appropriate
signage and lighting is used to improve safety and illuminate attractive buildings.
Safe and Pleasant
The proposal creates attractive places by providing a sense of security, including by
encouraging activity, considering crime rates, providing a clear distinction between private
and public space, creating active frontages and considering the benefits of natural
surveillance for streets, paths and open spaces.
The proposal creates a pleasant, positive sense of place by promoting visual quality,
encouraging social and economic interaction and activity, and by considering the place
before vehicle movement.
The proposal respects the amenity of existing and future users in terms of noise, privacy,
sunlight/daylight, smells, vibrations, glare, traffic generation, and parking. The proposal
sufficiently investigates and responds to any issues of ground instability. 
Adaptable
The proposal considers future users of the site and ensures that the design is adaptable to
their needs. This includes consideration of future changes of use that may involve a mix of
densities, tenures, and typologies to ensure that future diverse but compatible uses can be
integrated including the provision of versatile multi-functional greenspace. 
Resource Efficient
The proposal maximises the efficient use of resources. This can be achieved by re-using or
sharing existing resources and by minimising their future depletion. This includes
consideration of technological and natural means such as flood drainage systems, heat
networks, solar gain, renewable energy and waste recycling as well as use of green and
blue networks. 
Easy to Move Around and Beyond

Page 6

The proposal considers the connectedness of the site for people before the movement of
motor vehicles, by prioritising sustainable and active travel choices, such as walking, cycling
and public transport and ensuring layouts reflect likely desire lines, through routes and
future expansions. 
Detailed Policy 1 -New Homes/Land Supply
Policy 1: 
New Homes and Maintaining an Effective Housing Land Supply 
In principle we will support and promote residential development of the 51 effective housing
supply sites shown in Schedules 2a and 2b. We will protect them by resisting alternative
development, including significant reductions in capacity which would undermine our ability
to confirm an ongoing 5-year land supply.
In principle, we will also support and promote residential development
of our 27 long-term housing sites shown in schedule 3. In particular, but not limited to, where
they would contribute to our ongoing 5-year effective land supply.
Notwithstanding the above, we will support ancillary development for a range of
accommodating and integrated uses including locally important community, leisure, and
other employment uses like shops, banks, cafes, workshops, garages, and small offices
within these sites where they would not negatively impact upon our ability to maintain an
effective 5 year housing land supply.
We will monitor the delivery of new homes in North Ayrshire through a housing land audit to
ensure the maintenance of an effective five-year supply of land for housing. Where we
identify and confirm a shortfall we will consider innovative approaches to enable
development in the first instance. We will only support new housing proposals where they
would help us achieve the vision, for example by aligning with the principles of the spatial
strategy and being compliant with other aspects of the plan particularly by way of impact on
committed infrastructure and the environment. 
Detailed Policy 22 - Water Environment Quality 
Policy 22: 
Water Environment Quality 
Proposals for additional cemetery provision to meet identified needs within our locality areas
of Irvine, Kilwinning, Arran, North Coast, Three Towns and Garnock Valley will be supported
where unacceptable environmental and amenity impacts are avoided. Groundwater
assessments may be required to support proposals with mitigation measures identified and
agreed where necessary. 
We will support development that helps achieve the objectives of the Water Framework
Directive and the River Basin Management Plan for Scotland. Generally, development
which would lead to the deterioration of the water environment will be resisted unless it
would deliver significant social, environmental or economic benefits. 
Development will be required to ensure no unacceptable adverse impact on the water
environment by:

Page 7

a) Protecting and enhancing the ecological status and riparian habitat, natural heritage,
landscape values and physical characteristics of water bodies (including biodiversity
and geodiversity);
b) Protecting and enhancing existing flood plains; protecting opportunities for public
access to and recreation and enjoyment on and around lochs, rivers, burns, wetlands
and the coastal marine area; and
c) Having regard to any designated Bathing Waters. Where engineering works are
required in or near water bodies, there will be a presumption in favour of soft
engineering techniques and against the culverting of watercourses, unless there is
no suitable alternative. Proposals for culverting of watercourses for land gain
may only be justified if the applicant can demonstrate that: 
o No other practical option exists that would allow the watercourse to remain open; and
o The proposed development is of over- riding public interest. 
We support connection to public sewerage systems in the first instance but recognise that
wastewater solutions must be affordable and delivered at the most appropriate scale and
that in many cases septic tank systems can be the most sensible solution for a household or
small community (this also might be bespoke  for our island communities). We will consider
the cumulative impact of such solutions and support a preference for community solutions. 
Development should ensure that appropriately sized buffer strips are maintained between
the built and water environments. 
Indicative Width of watercourse (top of bank) Indicative Width of buffer strip (either side)
Less than 1m                                                     6m
1-5m                                                                      6-12m
15-15m                                                         12-20m
15m+                                                                         20m+         
Detailed Policy 23-Flood Risk Management
Policy 23: 
Flood Risk Management 
We will support development that demonstrates accordance with the Flood Risk Framework
as defined in Scottish Planning Policy and shown in schedule 7, relevant flood risk
management strategies and local flood risk management plans. We will also support
schemes to manage flood risk, for instance through natural flood management, managed
coastal realignment, wetland or green infrastructure creation.
Generally, development should avoid locations of flood risk and should not lead to a
significant increase in the flood risk elsewhere. Land raising and elevated buildings will only
be supported in exceptional circumstances, where it is shown to have a neutral or better
impact on flood risk outside the raised area. 
Development proposals should:
o Clearly set out measures to protect against, and manage, flood risk.
o Include sustainable urban drainage systems (SuDS) where surface water is
proposed to be discharged to the water environment, in accordance with the Water
Environment (Controlled Activities) (Scotland) Regulations 2011 as amended.

Page 8

o Include provision of temporary/construction phase SuDS.
o include appropriate long-term maintenance arrangements.
o Be supported by an appropriate flood risk assessment where at risk of flooding from
any source in medium to high risk areas and for developments in low to medium risk
areas identified in the risk framework (schedule 7).
o Take account of SEPA's flood risk and land use vulnerability guidance (2018) and
any relevant updates to, or replacements of this guidance.   
Detailed Policy 27
Sustainable Transport and Active Travel 
We will support development that:
contributes to an integrated transport network that supports long term sustainability
o reduces inequality by improving the accessibility and connectivity of employment
opportunities and local amenities
o provides safe and convenient sustainable transport options and supports modal shift
to sustainable transport and active travel.
o reduces the need to travel or appropriately mitigates adverse impacts of significant
traffic generation, road safety and air quality, including taking into account the
cumulative impact.
o takes a design-led, collaborative approach to street design to provide safe and
convenient opportunities for integrated sustainable travel in the following order of
priority: pedestrians, people on cycles, people using collective transport (buses,
trains etc.) and people using private transport.
o considers the potential requirements of other infrastructure providers, including
designing for the potential development of district heat networks by for example
incorporating access points into the transport network to allow for future pipe
development or creating channels underneath the road/infrastructure to enable pipe
development with minimal disruption to the networks.
o enables the integration of transport modes and facilitates movement of freight by rail
or water (in preference to road). This would include, for example, the provision of
infrastructure necessary to support positive change in transport technologies, such
as charging points for electric vehicles and the safeguarding of disused railway lines
with the reasonable prospect of being used as rail, tram, bus rapid transit or active
travel routes.
o considers the impact on, and seeks to reduce risk to level crossings, including those
located within Ardrossan, Stevenston and Gailes. 
Proposals are expected to include an indication of how new infrastructure or services are to
be delivered and phased, and how and by whom any developer contributions will be made. 
We will take account of:
o the implications of development proposals on traffic, patterns of travel and road
safety.
o Significant traffic generating uses should be sited at locations that are well served by
public transport, subject to parking restraint policies, and supported by measures to
promote the availability of high-quality public transport services. Where this is not
achievable, we may seek the provision of subsidised services until a sustainable
service is achievable.

Page 9

o the potential vehicle speeds and level of infrastructure provided for the expected
numbers of trips by all modes.
o the relationship between land use and transport and particularly the capacity of the
existing transport network, environmental and operational constraints, and proposed
or committed transport projects.
o committed and proposed projects for the enhancement of North Ayrshire's transport
infrastructure, including improved park and ride provision.
o specific locational needs of rural communities. We recognise that in rural areas we
need to be realistic about the likely viability of public transport services and
innovative solutions such as demand-responsive public transport and small scale
park and ride facilities at nodes on rural bus corridors will be considered.
o The Council's adopted Local Transport Strategy, Core Paths Plan, Town Centre
Parking Strategy and parking requirements.
o The need to mitigate and adapt to climate change with regard to the Climate Change
(Scotland) Act 2009.
o The provision of new and improved links to existing and proposed active travel routes
which are integrated with the wider strategic network, including the National Walking
and Cycling Network, core paths and the Ayrshire Coastal Path.
Developments likely to generate significant additional journeys will be required to be
accompanied by a Transport Assessment, Air Quality Assessment and a Travel Plan. A
Transport Statement will be required for smaller scale developments that will not have a
major impact on the transport network, but are still likely to have an impact at a local level on
the immediate transport network. 
National Development: 
The National Walking and Cycling Network (NWCN) was designated as a national
development within the National Planning Framework (NPF3). This is an ambitious project
which aims to grow Scotland's
network of paths from 6,000 to 8,000 km by 2035. Key routes in North Ayrshire which will
contribute to this network are detailed below. These are being developed in partnership with
Sustrans and Scottish Natural Heritage as lead organisations for the delivery of the NWCN. 
These include the development of an off-road alignment for:
o National Cycle Network (NCN) Route 73 (North) between Brodick and Corrie on the
Isle of Arran
o NCN Route 753 between Skelmorlie and Ardrossan
o While not explicitly referenced in NPF3, support will be given to development of an
off-road alignment for NCN Route 7 between Kilwinning and Kilbirnie. 
Detailed Policy 29 - Energy Infrastructure Development 
Policy 29: 
Energy Infrastructure Development 
We will support development proposals for energy infrastructure development, including
wind, solar, tidal, cropping and other renewable sources, where they will contribute
positively to our transition to a low carbon economy and have no unacceptable adverse
environmental impacts, taking into consideration (including cumulatively) the following:

Page 10

Environmental
o Communities and individual dwellings - including visual impact, residential amenity,
noise and shadow flicker;
o Water quality;
o Landscape - including avoiding unacceptable adverse impacts on our landscape
designations;
o Effects on the natural heritage - including birds;
o Carbon rich soils including peat;
o Impacts on the historic environment - including scheduled monuments, listed
buildings and their settings. 
Community
o Establishing the use of the site for energy infrastructure development;
o providing a net economic impact - including socio-economic benefits such as
employment, associated business and supply chain opportunities;
o Scale of contribution to renewable energy generation targets;
o Public access - including impact on long distance walking and cycling routes and
scenic routes identified in the National Planning Framework;
o Impacts on tourism and recreation;
o Specific locational opportunities for energy storage/generation. 
Public Safety
o Greenhouse gas emissions;
o Aviation and defence interests and seismological recording;
o Telecommunications and broadcasting installations - particularly ensuring that
transmission links are not compromised; radio telemetry interference and below
ground assets;
o Road traffic and adjacent trunk roads;
o Effects on hydrology, the water environment and flood risk including drinking water
quality and quantity (to both the public and private water supplies);
o Decommissioning of developments - including ancillary infrastructure, and site
restoration and aftercare. 
Proposals should include redundancy plans which will demonstrate how apparatus will be
timeously removed as reasonably soon as the approved scheme ceases operation. There
may be a requirement for financial bonds to ensure that decommissioning can be achieved.
Taking into consideration the above, proposals for wind turbine developments should
accord with the Spatial Framework (as mapped) and consider the current Landscape
Capacity Study for Wind Farm Development in North Ayrshire. This study will be used as a
point of reference for assessing all wind energy proposals including definitions of what small
to large scale entails. 
Buildings: Low and Zero Carbon Generating Technology 
Proposals for all new buildings will be required to demonstrate that at least 10% of the
current carbon emissions reduction set by Scottish Building Standards will be met through
the installation and operation of low and zero-carbon generating technologies. A statement
will be required to be submitted demonstrating compliance with this requirement. The
percentage will increase at the next review of the local development plan. 
This requirement will not apply to: 
1. Alterations and extensions to buildings

Page 11

2. Change of use or conversion of buildings 
3. Ancillary buildings that stand alone and cover an area less than 50 square metres 
4. Buildings which will not be heated or cooled, other than by heating provided solely for
frost protection. 
5. Buildings which have an intended life of less than two years. 
Detailed Policy 31 - Future Proofing for
Policy 31: 
Future Proofing for Heat Networks 
We will support proposals for the creation or enhancement of district heat networks in as
many locations as possible in North Ayrshire (even where they are initially reliant on
carbon-based fuels if there is potential to convert them to run on renewable or low carbon
sources of heat in the future).
We will seek to identify and safeguard existing and future heat network generation and
distribution infrastructure, including piperuns and pipework within, and to the curtilage of,
new developments. 
Proposals for development that constitute a significant heat source or substantial
development* which would not result in the creation or enhancement of district heat
networks should include: 
i) provision for on-site heat recovery and re-use infrastructure; or
ii) a heat network generation and distribution infrastructure plan (a district heating plan),
taking into account the potential to connect to future heat demand sites; or
iii) demonstrable evidence that district heating or other forms of renewable generation
storage have been explored but are not feasible for technical (proximity, geography,
safety etc) or economic reasons. 
* 'Substantial' developments consist of urban extensions, large regeneration areas or large
development sites subject to master planning or large mixed use developments and major
sites (50 residential units and above). There is, however, an element of judgment that will
need to be applied here and it might be that some other locations offer significant potential
for heat networks due to their local context, support from the local authority, and 'buy in' from
developers. 
2. Consultations and Representations 
Neighbour notification was undertaken, and the application was advertised in the local
press. Seven letters of objection have been received; the points raised in which are
summarised below: 
1. The proposed properties on the southern boundary would overlook the existing properties
to the south along St Andrews Court, Clytus Court and Betsy Miller Wynd which would result
in loss of privacy for the existing properties. These properties should be reoriented 45

Page 12

degrees and additional screening provided in the form of hedges and trees along the
boundary line. 
Response:  The proposed dwellinghouses close to the southern boundary of the site are
oriented to face the road to the north which is considered optimal from a place-making
perspective, and it would not be considered acceptable to re-orient them so that they were
not facing the road. The closest properties at plots 10-21 have a back garden length of a
minimum  of approx. 8.5m. The closest distance between the rear elevations of the houses
on St Andrews Court and the rear elevations of the proposed houses is approx. 17m, which
is considered to be an acceptable separation distance for a suburban location, and it is not
considered that the proposed dwellinghouses close to the southern boundary would lead to
significant loss of privacy for the existing houses to the south. Sectional drawings have been
provided indicating the proposed levels to these houses. It is not considered that any
additional screening would be required. 
2. The proposed development would result in the loss of natural habitat and the site contains
a range of habitats and species. Additional hedges, trees and wildflower areas should be
provided within the site should the application be approved. No open space is proposed in
the layout. 
Response: The site has been allocated as a housing site in the LDP. The applicant has
provided an Ecological Report which finds no evidence of protected species or habitats. A
condition requiring a landscaping scheme could be attached to any permission which may
be forthcoming in order to ensure that a suitable level of planting is undertaken. A small area
of open space is provided within the development site. The site is located on the edge of
Saltcoats, and it is considered that there is sufficient access to green and amenity spaces. 
3. The proposed access from Barga Gardens would increase noise, pollution and create
road safety issues for the existing properties on Barga Gardens. 
Response: It is not considered that the Barga Gardens vehicular link would result in
significant additional noise, pollution or road safety issues. The link would be a secondary
route and the majority of the traffic would utilise the main east/west route through the site. 
The Barga Gardens link is considered important in the interest of integrating the
development in with the existing road network and making the development easy to move
around and beyond. 
4. The proposed pumping station could lead to additional noise and odours affecting the
existing nearby dwellinghouses. 
Response: The applicant has confirmed that the pumping station would not result in any
significant noise. North Ayrshire Council (NAC) Environmental Health was consulted and
did not object to the pumping station on noise or smell grounds, subject to a Planning
condition. 
5. The scale of the proposed development is excessive. 
Response: The application site makes up approximately half of the 'West of Sharphill'
long-term housing site which has an indicative capacity of 200 units. The proposed
development would have 99 units. The proposed development would have a density of
approx. 29 dwellings per hectare which is considered suitable for a suburban development.

Page 13

6. The proposed development would have a negative impact on property prices in the
surrounding area. 
Response: This is not a material Planning consideration. 
Consultations: 
NAC Active Travel and Transportation: No objections. Further discussions with NAC
Flooding will be required with relation to the diverted drainage ditch. The impact of the
potential vehicle link with Barga Gardens should be discussed with Active Travel and
Transportation. 
Response: Such discussions between the applicant and NAC Flooding have taken place,
and NAC Flooding have confirmed that they do not object to the proposal. The vehicle link to
Barga Garden has been secured by Planning and is considered necessary in the interest of
placemaking and creating a neighbourhood that is easy to move around and beyond. Full
details of this vehicular link can be secured via condition. The details of the road design can
also be finalised during the Road Construction Consent. 
NAC Environmental Health: No objections, subject to conditions relating to a Remediation
Strategy, Construction Environmental Management Plan and noise from the pumping
station. 
Response: Noted, such conditions could be attached to any Planning Permission which
may be forthcoming. 
NAC Flooding: Initially objected due to the proposal to drain surface water into the field
ditch to the west of the site. This ditch has experience flooding events in the past. The
applicant has confirmed that works will be undertaken to the ditch downstream of the
proposed SuDS basin to address the flooding concerns which will act to reduce flow within
the downstream ditch compared to current conditions. Therefore, NAC Flooding has
removed the objection, subject to conditions. 
Response: Noted, such conditions could be attached to any Planning Permission which
may be forthcoming. 
Scottish Environmental Protection Agency (SEPA): Initially objected on the basis on a
lack of information with regards to flood risk. Following the submission of additional
information by the applicant's flooding consultants, SEPA has removed the objection. 
Response: Noted. 
NAC Education: Modelling shows sufficient capacity at the local schools to accommodate
the number of additional children expected. 
Response: Noted. 
Scottish Water: No objections. 
Response: Noted.

Page 14

West of Scotland Archaeological Service (WOSAS): No objections subject to a condition
requiring a scheme of archaeological works to be undertaken. 
Response: Noted, such a condition could be attached to any Planning Permission which
may be forthcoming. 
3. Analysis 
The Towns and Villages Objective of Strategic Policy 1: Spatial Strategy of the LDP states
that within areas designated as General Urban Area, proposals for residential development
will accord with the LDP in principle, and that applications will be assessed against the
relevant policies of the LDP. 
Policy 1: New Homes and Maintaining an Effective Housing Land Supply, of the LDP, states
that we will in principle support and promote residential development of the 51 effective
housing supply sites identified in Schedule 2a and 2b of the LDP. It goes on to state that we
will in principle support and promote residential development of our 27 long-term housing
sites shown in Schedule 3 of the LDP. The application site makes up part of the 'West of
Sharphill' long-term housing site shown in Schedule 3 of the LDP, with an indicative
capacity of 200 units. The site is therefore considered to be an acceptable location in
principle for a residential development. As the application site makes up just under half of
the area of the allocated housing site and has just under half of the indicative capacity it is
considered that the proposed development is of an appropriate density. The applicant has
advised of plans to progress the second section of the West of Sharphill site in the near
future. The proposal accords with Policy 1. 
Strategic Policy 2: Placemaking, of the LDP, states that proposals should accord with the
qualities of successful places outlined within the policy. The proposed development
incorporates sixteen house types including terraces, semi-detached and detached houses.
All the houses are two storeys with gabled roof designs. Earlier phases of Sharphill (2B and
2C) feature the same house types and the existing housing development to the south also
features very similar houses both in terms of style and finishing materials. It is therefore
considered that the proposed development would be in-keeping with the character of the
neighbourhood. It is considered appropriate to attach a condition which would require
further details with regards to the external finishes to ensure the final choice of materials is
appropriate for the locality and contains enough variety to provide visual intertest. 
The layout of the development would primarily feature straight and legible streets, however,
the eastern part of the site has a more fragmented layout due to the diverted drainage ditch.
Improvements to the layout were secured by the case officer to ensure that the majority of
the houses face onto the street which would create attractive and enclosed streetscapes.
The layout would be well connected to the surrounding area with vehicle links to the south
and east tying-in with existing developments and a future road link to the remainder of the
allocated housing site to west being provided. As described previously, the case officer
recommended a link be provided to the unallocated countryside to the north in the interest of
future planning, however, this was not possible due to site constraints. Overall, it is
considered that the internal layout is comprehensible, and that the development would be
easy to move around and beyond.

Page 15

An area of open space would be provided in the eastern part of the site and the SuDs basin
would be located in thew western part. The development is on the edge of Saltcoats and
benefits from access to plenty of open space. The nearest playground is at Allan Gardens
approx. 200m to the south of the site and accessible via a pedestrian footpath.  All houses
within the development would have private rear gardens enclosed by 1.8m high timber
fences and front gardens would be open in character. Further details of landscaping are
required and could be ensured via condition. 
The layout of the site has been designed in order to ensure that the houses do not have their
privacy or access to daylight affected through overlooking or overshadowing from other
properties. There is a change in levels throughout the site and experience with the previous
phases has shown that ground works may be required to create level development
platforms which could lead to amenity issues. It is therefore considered necessary to attach
a condition requiring details of any ground works/cut and fill exercises to be undertaken.
Sufficient separation has been provided with the existing houses to the south to ensure that
there would be no significant loss of privacy for any existing properties.  All houses have
been provided with two parking spaces, the majority of which are located in-curtilage. Visitor
parking is spread evenly throughout the site.  In conclusion, the proposed development
meets with the qualities of successful places and therefore accords with Strategic Policy 2:
Placemaking. 
Policy 22 of the LDP states that development will be required to ensure no unacceptable
adverse impact on the water environment. Development should ensure that appropriately
sized buffer strips are maintained between the built and water environments. Related to this
issue is Policy 23, which deals with flood risk management. Taking both of these polices
together, there is an existing drainage ditch which bisects the site and a further drainage
ditch along the western boundary. Discussions have taken place between the applicant,
NAC Flooding and SEPA with regards to the drainage proposals which involve diverting the
drainage ditch which runs through the site and discharging the surface water run off via the
detention basin into the existing field ditch to the west of the site. Works will be undertaken
to the field ditch downstream of the site to prevent flooding. While this area falls outwith the
application site, it is within land controlled by the applicant and the flood prevention works
can therefore be addressed via condition.  As highlighted previously in this report, following
these discussions, NAC Flooding and SEPA have both withdrawn their objections to the
proposed development. 
With regards to foul water, a pumping station would be provided adjacent to the SuDs basin.
The only above ground component of the pumping station would be a kiosk measuring
approx. 7sqm in area and 1.8m in height. The applicant has advised that the pumping
station would not lead to significant noise or smells. NAC Environmental Health has
indicated a Planning condition to limit noise from the pumping station. The proposed
development accords with Policies 22 and 23 of the LDP. 
Policy 27 relates to sustainable transport and active travel. The proposed development is
located within easy walking distance of a primary school, shop, playpark and bus stop. The
nearest train stations are approx. 30 minutes' walk away. However, given the site's
peripheral location and allocation in the LDP, it is considered acceptable in this instance.
Internally, the site is well laid out to minimise traffic speeds and create a pleasant pedestrian
environment. The site layout makes use of the available connections to the neighbouring
residential areas and thereby creates an integrated and walkable neighbourhood. Sufficient

Page 16

levels of parking have been provided and visitor parking is spread evenly throughout the
site. The development accords with Policy 27. 
Policy 29: Energy Infrastructure Developments, requires that all proposals for new buildings
demonstrate that at least 10% of the current carbon emission reduction targets set by
Scottish Building Standards are met through the use of low or zero carbon generating
technologies. All new homes would have photovoltaic roof panels installed and modern
heating and insulation which would allow them to achieve this target. The proposed
development accords with Policy 29. 
Policy 31 relates to future proofing for heat networks. The proposed development would
utilise modern building designs which would minimise the energy requirements for heating
through modern insulation. The houses have been oriented to take advantage of solar gain
where possible. The site is not considered to be a suitable candidate for a district heating
system. The proposal accords with Policy 31. 
In conclusion, the proposal is in accordance with all of the relevant polices of the LDP, and
the development would entail the delivery of part of a housing site which has been identified
and allocated as part of the local development plan process.  Accordingly, the application is
recommended for approval subject to the conditions referred to in this report. 
4. Full Recommendation 
Approved subject to Conditions 
Reasons for Decision 
Condition 
1. That prior to the commencement of the development hereby approved, the developer
shall provide full details of the proposed finishing materials for the written approval of
North Ayrshire Council as Planning Authority. Thereafter, the development shall
progress in accordance with such details as may be approved. 
Reason
In order to ensure that the finishing materials are high quality and attractive; in the
interest of the visual amenity of the area. 
Condition 
2. That no development shall take place until there has been submitted to and approved
by North Ayrshire Council as Planning Authority a scheme of landscaping, which
shall include details of species, planting densities, soil treatment and aftercare and
shall include indications of all existing trees and hedgerows on the land and details of
any to be retained together with measures for their protection in the course of the
development. 
Reason 
In order to ensure that the site is appropriately landscaped, in the interest of amenity.

Page 17

Condition 
3. That all planting, seeding or turfing comprised in the approved details of landscaping
shall be carried out in the first planting season and seeding seasons following the
occupation of the buildings or the completion of the development, whichever is the
sooner; and any trees or plants which, within a period of five years from the
completion of the development die, are removed or become seriously damaged or
diseased shall be replaced in the next planting season with others of a similar size
and species, unless North Ayrshire Council as Planning Authority gives written
consent to any variation. 
Reason
In order to ensure that the approved landscaping is carried out and maintained, in the
interest of amenity 
Condition 
4. That prior to the commencement of the development, hereby approved, the
developer shall provide a proposed topographical plan displaying full details of
Finished Floor Levels, any ground works, cut and fill and site levelling for the written
approval of North Ayrshire Council as Planning Authority. Thereafter, the
development shall progress in accordance with such details as may be approved by
North Ayrshire Council as Planning Authority. 
Reason
In order to ensure that any changes to the ground levels do not result in overlooking
or overshadowing of neighbouring properties. In the interest of amenity. 
Condition 
5. Site clearance or similar works shall not take place during the nesting bird period
(March to August, inclusive). If works cannot be undertaken outside this period, then
a breeding bird survey shall be undertaken to determine which nests are active, and
no section of the site within 10m of an active nest shall be cleared until the bird
nesting season is over. All to the satisfaction of North Ayrshire Council as Planning
Authority. 
Reason
In order to ensure no nesting or breeding birds are impacted by the proposed
development. In the interest of ecology. 
Condition 
6. If any trees are scheduled to be felled as part of the development, a Preliminary
Roost Assessment shall be undertaken on the trees scheduled to be felled, and the
results shall be submitted to North Ayrshire Council as Planning Authority.
Thereafter, if any remediation works are required, they shall be undertaken as
agreed, in writing by North Ayrshire Council as Planning Authority. 
Reason
In order to ensure no bats are impacted by the proposed development. In the interest
of ecology. 
Condition

Page 18

7. That prior to any development commencing the applicant shall submit a Remediation
Strategy for the written approval of North Ayrshire Council as Planning Authority as
recommended the in the Ground Investigation Report by JPB June 2020,
UG537-14/MAK. Thereafter, the development shall progress in accordance with the
approved Remediation Strategy. 
Reason 
In the interest of public health. 
Condition 
8. That the applicant shall submit a Construction Environmental Management Plan
(CEMP) for the written approval of North Ayrshire Council as Planning Authority prior
to the commencement of any works, as recommended within the submitted Air
Quality Impact Assessment report by ITPEnergised, May 2022, Project No 5272.
Thereafter, the development shall progress in accordance with the approved CEMP. 
Reason 
In the interest of public health. 
Condition 
9. The rated noise level, as defined in BS4142:2014 +A1:2019, from the operation of
the proposed pumping station must not exceed the existing background noise level
at the curtilage of any noise sensitive property, to the satisfaction of North Ayrshire
Council as Planning Authority. 
Reason
In order to ensure that the pumping station does not cause a noise disturbance; in the
interest of amenity. 
Condition
10. That prior to the commencement of the development hereby approved, the full details
of the proposed improvements or alterations to the existing ditches and the detail of
the proposed ditch both within and outwith the application site shall be submitted for
the written approval of North Ayrshire Council as Planning Authority. For the
avoidance of doubt, this shall include details of culverts (road crossings) and a '1 in
200' year critical storm resilience check on the proposed drainage system, including
identification and design of any necessary flood flow-paths, together with
maintenance of these flow-paths. Thereafter, the approved details should be
implemented prior to the completion of the development and maintained in
perpetuity. 
Reason 
In the interest of flood risk management. 
Condition
11. That no development shall take place within the development site as outlined in red
on the approved plan until the developer has secured the implementation of a
programme of archaeological works in accordance with a written scheme of
investigation which has been submitted by the applicant, agreed by the West of
Scotland Archaeology Service, and approved by North Ayrshire Council as Planning
Authority. Thereafter the developer shall ensure that the programme of

Page 19

archaeological works is fully implemented and that all recording and recovery of
archaeological resources within the development site is undertaken to the
satisfaction of the Planning Authority in agreement with the West of Scotland
Archaeology Service. 
Reason
In order to ensure that any historic artifacts located on the site are suitably
catalogued and preserved. 
Condition
12. That prior to the commencement of the development hereby approved, the developer
shall provide full details of the vehicular link to Barga Gardens for the written approval
of North Ayrshire Council as Planning Authority. This shall include an updated
Transportation Assessment which shall include a traffic impact analysis of the
development including the Barga Gardens Road link. Thereafter, the development
shall progress in accordance with such details as may be approved. 
Reason 
In the interest of road safety. 
James Miller 
Chief Planning Officer           
For further information please contact Mr John Mack on 01294 324794.
Appendix 1 – Location Plan           
DO NOT SCALE Reproduced from the Ordnance Survey mapping with the permission of the Controller of Her Majesty’s Stationery
Office © Crown Copyright.  Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings.
North Ayrshire Council Licence Number 100023393.

Page 20

No embedded text on this page.