Page 1

NORTH AYRSHIRE COUNCIL 
Planning Committee 
Locality  Irvine
Reference 22/00094/PPM
Application Registered 9th February 2022
Decision Due 9th June 2022
Ward Irvine East 
Recommendation  Approved subject to Conditions 
__________________________________________________________________ 
Location  1 - 5 Crompton Way North Newmoor Irvine Ayrshire
KA11 4HU 
Applicant  Manse Irvine LLP Fao Mr Andrew Statham 
Proposal  Erection of 60 dwellinghouses including the formation
of access roads, open space, landscaping and
ancillary works
___________________________________________________________________ 
1. Description 
The application site relates to an area of approximately 1.98ha in the North Newmoor area
of Irvine. The site is bounded by Crompton Way to the west, Arkwright Way to the south, the
Amer Sports distribution warehouse to the east and housing development, which is under
construction to the north. The character of the site is brownfield land. An industrial building
previously occupied the site and there are the remains of a redundant car park. 
The proposed development would be a housing estate comprising of 60 units. The housing
would include detached, semi-detached, and terraced houses, with a total of six different
designs (house types). All house types would be two storeys in height, and some would
feature integral garages. The roofs would be gabled and finished with grey concrete tiles.
The walls would be finished in a combination of facing brick and dry dash render. 
The proposed layout of the site features a single vehicular access from Crompton Way in
the northwest. There would be two pedestrian accesses onto Arkwright Way in the south.
Internally the layout would feature two blocks and the houses on the perimeter of the
development would face onto Crompton Way and Arkwright Way. A SuDS detention basin
for the treatment and storage of surface water would be located in the northwest corner of

Page 2

the site adjacent to the vehicular access. The houses facing Arkwright Way would be set
back approx. 20m from the road to accommodate a gas main wayleave. In addition, the
houses facing Crompton Way would be set back due to a change in levels. The majority of
the parking would be in-curtilage parking with the exception of two small parking courts to
serve some of the terraces. 
The proposed vehicular access for the site is the current access to the Amer Sports Service
Yard.  The applicant owns the Amer Sports building as well as the application site and,
independently of the development, would provide a new access to the Amer Sports Service
Yard to the east of the application site from Arkwright Way. This proposal falls outwith the
development area and could be carried out under permitted development rights, which are
available to existing industrial and warehouse sites. A security fence/acoustic barrier would
be erected along the eastern boundary of the application site where it bounds the proposed
new access and existing service yard for Amer Sports. Within the site, rear gardens would
be delineated by 1.8m high timber fences and front gardens would be open in character. 
The application site is located in a General Urban Area land allocation in the adopted North
Ayrshire Local Development Plan (LDP). It also comprises part of the North Newmoor
Industrial Estate effective housing site. The relevant polices of the LDP to this proposal are: 
- The Towns and Villages Objective of Strategic Policy 1: Spatial Strategy
- Strategic Policy 2: Placemaking
- Policy 1: New Houses and Maintaining an Effective Housing Land Supply
- Policy 2: Regeneration Opportunities
- Policy 22: Water Environment Quality
- Policy 23: Flood Risk Management
- Policy 27: Sustainable Transport and Active Travel
- Policy 29: Energy Infrastructure Development
- Policy 31: Future Proofing for Heat Networks 
The applicants initially approached North Ayrshire Council (NAC) Planning for
pre-application discussions with regards to a residential development of the site in July 2021
(21/00705/PREAPP). They submitted their Proposal of Application Notice on the 4th
November 2021(21/01066/PREAPM). 
Significant design changes to the layout have been achieved via discussions between the
applicant and North Ayrshire Council (NAC) Planning and NAC Active Travel and
Transportation officers since the original submission. These include: 
- re-orientation of houses in the south of the development to front onto Arkwright Way;
- increase in the number of houses with in-curtilage parking and reduction in size of parking
courts including provision of in-curtilage parking for houses facing onto Crompton Way to
prevent on-street parking;
- changes to internal road layout to reduce vehicle speeds;
- more even distribution of visitor parking spaces; and
- enhanced landscaping and street layout. 
The following supporting information was included with the application: 
Design and Access Statement (DAS)
The DAS contains an analysis of the site and details of the design proposals.

Page 3

Drainage Strategy Report 
There is not a water course which runs through the site, with the nearest watercourse, the
Annick Water approx. 450m to the south of the site. The proposed SuDS solution would
include porous paving and a detention basin. Foul water drainage would connect to the
existing Scottish Water foul network at the junction with Crompton Way. 
Flood Risk Assessment (FRA)
The SEPA flood map indicates low risk of fluvial flooding but small areas of potential pluvial
flooding. Surface water may enter the site from the northeast and could pool. The FRA
recommends that finished floor levels for the houses should be raised above the adjacent
ground levels and requirements for SuDS should be discussed and agreed with Scottish
Water. 
Environmental Noise Assessment 
Noise is likely to come from two primary sources: road traffic noise associated with the A78
to the west, and noise from fixed plant associated with adjacent industrial activity. Mitigation
for the road noise would include insultation in the form of double glazing and trickle vents for
properties affected. Mitigation for the fixed plant at the warehouse is suggested to be a 3-4m
high acoustic barrier and a close window strategy at plots 40-42. 
Ground Investigation Report
The ecologist noted the presence of invasive species such as cotoneaster and horsetail. No
remediation is required, however, these should be cleared in a controlled manner. The coal
mining risk assessment did not identify any coal mining hazards. 
Planning Statement
The applicant considers that the proposal complies with the relevant policies of the LDP and
offers an assessment of the proposal against these policies. 
Pre-application Consultation Report
The applicant engaged in pre-application consultation discussions with north Ayrshire
Council Planning Service. A Proposal of Application Notice (PAN) was submitted on the 4th
of November 2021. A virtual exhibition was held on the 25th of November 2021. The website
was visited 24 times and no feedback was received. 
Transport Assessment 
There is a footbridge to the west of the site which crosses the A78 Irvine Bypass. The
streets to the west of the A78 provide access on foot to Irvine town centre approx. 1.5km
away. Irvine train station is an approx. half hour walk from the site.  The nearest bus stop is
on the Broomlands Busway approx. 400m from the site. An analysis of the impact of the
proposed development on the nearby roads junctions was undertaken and it was concluded
that all junctions would continue to operate satisfactorily when the additional traffic resulting
from the development was taken into account. 
Relevant Development Plan Policies 
SP1 - Towns and Villages Objective
Towns and Villages Objective

Page 4

Our towns and villages are where most of our homes, jobs, community facilities, shops and
services are located. We want to continue to support our communities, businesses and
protect our natural environment by directing new development to our towns and villages as
shown in the Spatial Strategy. Within urban areas (within the settlement boundary), the LDP
identifies town centre locations, employment locations and areas of open space. Most of the
remaining area within settlements is shown as General Urban Area. Within the General
Urban Area, proposals for residential development will accord with the development plan in
principle, and applications will be assessed against the policies of the LDP. New
non-residential proposals will be assessed against policies of this LDP that relate to the
proposal. 
In principle, we will support development proposals within our towns and villages that: 
a) Support the social and economic functions of our town centres by adopting a town
centre first principle that directs major new development and investment to town
centre locations as a priority including supporting town centre living.
b) Provide the right new homes in the right places by working alongside the Local
Housing Strategy to deliver choice and variety in the housing stock, protecting land
for housing development to ensure we address housing need and demand within
North Ayrshire and by supporting innovative approaches to improving the volume
and speed of housing delivery.
c) Generate new employment opportunities by identifying a flexible range of business,
commercial and industrial areas to meet market demands including those that would
support key sector development at Hunterston and i3, Irvine.
d) Recognise the value of our built and natural environment by embedding placemaking
into our decision-making.
e) Prioritise the re-use of brownfield land over greenfield land by supporting a range of
strategic developments that will deliver:
regeneration of vacant and derelict land through its sustainable and productive
re-use, particularly at Ardrossan North Shore, harbour and marina areas,
Montgomerie Park (Irvine) and Lochshore (Kilbirnie).
regeneration and conservation benefits, including securing the productive re-use of
Stoneyholm Mill (Kilbirnie) and supporting the Millport Conservation Area
Regeneration Scheme.
f) Support the delivery of regional partnerships such as the Ayrshire Growth Deal in
unlocking the economic potential of the Ayrshire region. 
Strategic Policy 2
Placemaking
Our Placemaking policy will ensure we are meeting LOIP priorities to make North Ayrshire
safer and healthier by ensuring that all development contributes to making quality places.
The policy also safeguards, and where possible enhances environmental quality through
the avoidance of unacceptable adverse environmental or amenity impacts. We expect that
all applications for planning permission meet the six qualities of successful places,
contained in this policy. This is in addition to establishing the principle of development in
accordance with Strategic Policy 1: Spatial Strategy. These detailed criteria are generally
not repeated in the detailed policies section of the LDP. They will apply, as appropriate, to all
developments. 
Six qualities of a successful place

Page 5

Distinctive
The proposal draws upon the positive characteristics of the surrounding area including
landscapes, topography, ecology, skylines, spaces and scales, street and building forms,
and materials to create places with a sense of identity. 
Welcoming
The proposal considers the future users of the site and helps people to find their way
around, for example, by accentuating existing landmarks to create or improve views
(including sea views), locating a distinctive work of art in a notable place or making the most
of gateway features to and from the development. It should also ensure that appropriate
signage and lighting is used to improve safety and illuminate attractive buildings.
Safe and Pleasant
The proposal creates attractive places by providing a sense of security, including by
encouraging activity, considering crime rates, providing a clear distinction between private
and public space, creating active frontages and considering the benefits of natural
surveillance for streets, paths and open spaces.
The proposal creates a pleasant, positive sense of place by promoting visual quality,
encouraging social and economic interaction and activity, and by considering the place
before vehicle movement.
The proposal respects the amenity of existing and future users in terms of noise, privacy,
sunlight/daylight, smells, vibrations, glare, traffic generation, and parking. The proposal
sufficiently investigates and responds to any issues of ground instability. 
Adaptable
The proposal considers future users of the site and ensures that the design is adaptable to
their needs. This includes consideration of future changes of use that may involve a mix of
densities, tenures, and typologies to ensure that future diverse but compatible uses can be
integrated including the provision of versatile multi-functional greenspace. 
Resource Efficient
The proposal maximises the efficient use of resources. This can be achieved by re-using or
sharing existing resources and by minimising their future depletion. This includes
consideration of technological and natural means such as flood drainage systems, heat
networks, solar gain, renewable energy and waste recycling as well as use of green and
blue networks. 
Easy to Move Around and Beyond
The proposal considers the connectedness of the site for people before the movement of
motor vehicles, by prioritising sustainable and active travel choices, such as walking, cycling
and public transport and ensuring layouts reflect likely desire lines, through routes and
future expansions. 
Detailed Policy 1 -New Homes/Land Supply
Policy 1: 
New Homes and Maintaining an Effective Housing Land Supply 
In principle we will support and promote residential development of the 51 effective housing
supply sites shown in Schedules 2a and 2b. We will protect them by resisting alternative
development, including significant reductions in capacity which would undermine our ability
to confirm an ongoing 5-year land supply.

Page 6

In principle, we will also support and promote residential development
of our 27 long-term housing sites shown in schedule 3. In particular, but not limited to, where
they would contribute to our ongoing 5-year effective land supply.
Notwithstanding the above, we will support ancillary development for a range of
accommodating and integrated uses including locally important community, leisure, and
other employment uses like shops, banks, cafes, workshops, garages, and small offices
within these sites where they would not negatively impact upon our ability to maintain an
effective 5 year housing land supply.
We will monitor the delivery of new homes in North Ayrshire through a housing land audit to
ensure the maintenance of an effective five-year supply of land for housing. Where we
identify and confirm a shortfall we will consider innovative approaches to enable
development in the first instance. We will only support new housing proposals where they
would help us achieve the vision, for example by aligning with the principles of the spatial
strategy and being compliant with other aspects of the plan particularly by way of impact on
committed infrastructure and the environment. 
Detailed Policy 2 - Regeneration Opportunities  
Policy 2: 
Regeneration Opportunities 
In principle, we will support and promote development of brownfield land (including vacant
and derelict land) within our settlements, where the development aligns with the
placemaking policy. In particular, we support the re-use of sites shown in schedule 4 for a
range of urban uses which would contribute to the placemaking agenda, subject to their
impact on the surrounding established amenity, assessment against the Placemaking
Policy and in particular their impact on utility and service capacity.
Note that proposals for significant footfall generating uses considered against this policy
should accord with the Town Centre First Principle and must not undermine the vitality or
viability of town centres or the delivery of the effective housing and industrial land supplies
except where they would support the principle of sustainable development.
We will support development of the regeneration opportunities for a range of integrated
urban uses including:
o Residential.
o Local-scale community and leisure uses.
o Other local employment uses like shops, banks, cafes, workshops, garages, and
small offices (including working from home). 
We will also support alternative solutions which would improve the amenity or economic
outlook of the surrounding area such as
o Greening (Woodland planting, allotments etc.)
o Renewable Energy Generation
o Protection and enhancement of green and blue networks
There may also be instances in the plan period where new regeneration sites are identified.
In principle we will support proposals which are innovative, contribute to our placemaking
agenda and align with our vacant and derelict land strategy. 
Detailed Policy 22 - Water Environment Quality

Page 7

Policy 22: 
Water Environment Quality 
Proposals for additional cemetery provision to meet identified needs within our locality areas
of Irvine, Kilwinning, Arran, North Coast, Three Towns and Garnock Valley will be supported
where unacceptable environmental and amenity impacts are avoided. Groundwater
assessments may be required to support proposals with mitigation measures identified and
agreed where necessary. 
We will support development that helps achieve the objectives of the Water Framework
Directive and the River Basin Management Plan for Scotland. Generally, development
which would lead to the deterioration of the water environment will be resisted unless it
would deliver significant social, environmental or economic benefits. 
Development will be required to ensure no unacceptable adverse impact on the water
environment by:
a) Protecting and enhancing the ecological status and riparian habitat, natural heritage,
landscape values and physical characteristics of water bodies (including biodiversity
and geodiversity);
b) Protecting and enhancing existing flood plains; protecting opportunities for public
access to and recreation and enjoyment on and around lochs, rivers, burns, wetlands
and the coastal marine area; and
c) Having regard to any designated Bathing Waters. Where engineering works are
required in or near water bodies, there will be a presumption in favour of soft
engineering techniques and against the culverting of watercourses, unless there is
no suitable alternative. Proposals for culverting of watercourses for land gain
may only be justified if the applicant can demonstrate that: 
o No other practical option exists that would allow the watercourse to remain open; and
o The proposed development is of over- riding public interest. 
We support connection to public sewerage systems in the first instance but recognise that
wastewater solutions must be affordable and delivered at the most appropriate scale and
that in many cases septic tank systems can be the most sensible solution for a household or
small community (this also might be bespoke  for our island communities). We will consider
the cumulative impact of such solutions and support a preference for community solutions. 
Development should ensure that appropriately sized buffer strips are maintained between
the built and water environments. 
Indicative Width of watercourse (top of bank) Indicative Width of buffer strip (either side)
Less than 1m                                                 6m
1-5m                                                                 6-12m
15-15m                                                         12-20m
15m+                                                         20m+         
Detailed Policy 23-Flood Risk Management
Policy 23:

Page 8

Flood Risk Management 
We will support development that demonstrates accordance with the Flood Risk Framework
as defined in Scottish Planning Policy and shown in schedule 7, relevant flood risk
management strategies and local flood risk management plans. We will also support
schemes to manage flood risk, for instance through natural flood management, managed
coastal realignment, wetland or green infrastructure creation.
Generally, development should avoid locations of flood risk and should not lead to a
significant increase in the flood risk elsewhere. Land raising and elevated buildings will only
be supported in exceptional circumstances, where it is shown to have a neutral or better
impact on flood risk outside the raised area. 
Development proposals should:
o Clearly set out measures to protect against, and manage, flood risk.
o Include sustainable urban drainage systems (SuDS) where surface water is
proposed to be discharged to the water environment, in accordance with the Water
Environment (Controlled Activities) (Scotland) Regulations 2011 as amended.
o Include provision of temporary/construction phase SuDS.
o include appropriate long-term maintenance arrangements.
o Be supported by an appropriate flood risk assessment where at risk of flooding from
any source in medium to high risk areas and for developments in low to medium risk
areas identified in the risk framework (schedule 7).
o Take account of SEPA's flood risk and land use vulnerability guidance (2018) and
any relevant updates to, or replacements of this guidance.   
Detailed Policy 27
Sustainable Transport and Active Travel 
We will support development that:
contributes to an integrated transport network that supports long term sustainability
o reduces inequality by improving the accessibility and connectivity of employment
opportunities and local amenities
o provides safe and convenient sustainable transport options and supports modal shift
to sustainable transport and active travel.
o reduces the need to travel or appropriately mitigates adverse impacts of significant
traffic generation, road safety and air quality, including taking into account the
cumulative impact.
o takes a design-led, collaborative approach to street design to provide safe and
convenient opportunities for integrated sustainable travel in the following order of
priority: pedestrians, people on cycles, people using collective transport (buses,
trains etc.) and people using private transport.
o considers the potential requirements of other infrastructure providers, including
designing for the potential development of district heat networks by for example
incorporating access points into the transport network to allow for future pipe
development or creating channels underneath the road/infrastructure to enable pipe
development with minimal disruption to the networks.
o enables the integration of transport modes and facilitates movement of freight by rail
or water (in preference to road). This would include, for example, the provision of
infrastructure necessary to support positive change in transport technologies, such

Page 9

as charging points for electric vehicles and the safeguarding of disused railway lines
with the reasonable prospect of being used as rail, tram, bus rapid transit or active
travel routes.
o considers the impact on, and seeks to reduce risk to level crossings, including those
located within Ardrossan, Stevenston and Gailes. 
Proposals are expected to include an indication of how new infrastructure or services are to
be delivered and phased, and how and by whom any developer contributions will be made. 
We will take account of:
o the implications of development proposals on traffic, patterns of travel and road
safety.
o Significant traffic generating uses should be sited at locations that are well served by
public transport, subject to parking restraint policies, and supported by measures to
promote the availability of high-quality public transport services. Where this is not
achievable, we may seek the provision of subsidised services until a sustainable
service is achievable.
o the potential vehicle speeds and level of infrastructure provided for the expected
numbers of trips by all modes.
o the relationship between land use and transport and particularly the capacity of the
existing transport network, environmental and operational constraints, and proposed
or committed transport projects.
o committed and proposed projects for the enhancement of North Ayrshire's transport
infrastructure, including improved park and ride provision.
o specific locational needs of rural communities. We recognise that in rural areas we
need to be realistic about the likely viability of public transport services and
innovative solutions such as demand-responsive public transport and small scale
park and ride facilities at nodes on rural bus corridors will be considered.
o The Council's adopted Local Transport Strategy, Core Paths Plan, Town Centre
Parking Strategy and parking requirements.
o The need to mitigate and adapt to climate change with regard to the Climate Change
(Scotland) Act 2009.
o The provision of new and improved links to existing and proposed active travel routes
which are integrated with the wider strategic network, including the National Walking
and Cycling Network, core paths and the Ayrshire Coastal Path.
Developments likely to generate significant additional journeys will be required to be
accompanied by a Transport Assessment, Air Quality Assessment and a Travel Plan. A
Transport Statement will be required for smaller scale developments that will not have a
major impact on the transport network, but are still likely to have an impact at a local level on
the immediate transport network. 
National Development: 
The National Walking and Cycling Network (NWCN) was designated as a national
development within the National Planning Framework (NPF3). This is an ambitious project
which aims to grow Scotland's
network of paths from 6,000 to 8,000 km by 2035. Key routes in North Ayrshire which will
contribute to this network are detailed below. These are being developed in partnership with
Sustrans and Scottish Natural Heritage as lead organisations for the delivery of the NWCN. 
These include the development of an off-road alignment for:

Page 10

o National Cycle Network (NCN) Route 73 (North) between Brodick and Corrie on the
Isle of Arran
o NCN Route 753 between Skelmorlie and Ardrossan
o While not explicitly referenced in NPF3, support will be given to development of an
off-road alignment for NCN Route 7 between Kilwinning and Kilbirnie. 
Detailed Policy 29 - Energy Infrastructure Development 
Policy 29: 
Energy Infrastructure Development 
We will support development proposals for energy infrastructure development, including
wind, solar, tidal, cropping and other renewable sources, where they will contribute
positively to our transition to a low carbon economy and have no unacceptable adverse
environmental impacts, taking into consideration (including cumulatively) the following: 
Environmental
o Communities and individual dwellings - including visual impact, residential amenity,
noise and shadow flicker;
o Water quality;
o Landscape - including avoiding unacceptable adverse impacts on our landscape
designations;
o Effects on the natural heritage - including birds;
o Carbon rich soils including peat;
o Impacts on the historic environment - including scheduled monuments, listed
buildings and their settings. 
Community
o Establishing the use of the site for energy infrastructure development;
o providing a net economic impact - including socio-economic benefits such as
employment, associated business and supply chain opportunities;
o Scale of contribution to renewable energy generation targets;
o Public access - including impact on long distance walking and cycling routes and
scenic routes identified in the National Planning Framework;
o Impacts on tourism and recreation;
o Specific locational opportunities for energy storage/generation. 
Public Safety
o Greenhouse gas emissions;
o Aviation and defence interests and seismological recording;
o Telecommunications and broadcasting installations - particularly ensuring that
transmission links are not compromised; radio telemetry interference and below
ground assets;
o Road traffic and adjacent trunk roads;
o Effects on hydrology, the water environment and flood risk including drinking water
quality and quantity (to both the public and private water supplies);
o Decommissioning of developments - including ancillary infrastructure, and site
restoration and aftercare.

Page 11

Proposals should include redundancy plans which will demonstrate how apparatus will be
timeously removed as reasonably soon as the approved scheme ceases operation. There
may be a requirement for financial bonds to ensure that decommissioning can be achieved.
Taking into consideration the above, proposals for wind turbine developments should
accord with the Spatial Framework (as mapped) and consider the current Landscape
Capacity Study for Wind Farm Development in North Ayrshire. This study will be used as a
point of reference for assessing all wind energy proposals including definitions of what small
to large scale entails. 
Buildings: Low and Zero Carbon Generating Technology 
Proposals for all new buildings will be required to demonstrate that at least 10% of the
current carbon emissions reduction set by Scottish Building Standards will be met through
the installation and operation of low and zero-carbon generating technologies. A statement
will be required to be submitted demonstrating compliance with this requirement. The
percentage will increase at the next review of the local development plan. 
This requirement will not apply to: 
1. Alterations and extensions to buildings 
2. Change of use or conversion of buildings 
3. Ancillary buildings that stand alone and cover an area less than 50 square metres 
4. Buildings which will not be heated or cooled, other than by heating provided solely for
frost protection. 
5. Buildings which have an intended life of less than two years. 
Detailed Policy 31 - Future Proofing for Heat Networks 
Policy 31: 
Future Proofing for Heat Networks 
We will support proposals for the creation or enhancement of district heat networks in as
many locations as possible in North Ayrshire (even where they are initially reliant on
carbon-based fuels if there is potential to convert them to run on renewable or low carbon
sources of heat in the future).
We will seek to identify and safeguard existing and future heat network generation and
distribution infrastructure, including piperuns and pipework within, and to the curtilage of,
new developments. 
Proposals for development that constitute a significant heat source or substantial
development* which would not result in the creation or enhancement of district heat
networks should include: 
i) provision for on-site heat recovery and re-use infrastructure; or
ii) a heat network generation and distribution infrastructure plan (a district heating plan),
taking into account the potential to connect to future heat demand sites; or
iii) demonstrable evidence that district heating or other forms of renewable generation
storage have been explored but are not feasible for technical (proximity, geography,
safety etc) or economic reasons.

Page 12

* 'Substantial' developments consist of urban extensions, large regeneration areas or large
development sites subject to master planning or large mixed use developments and major
sites (50 residential units and above). There is, however, an element of judgment that will
need to be applied here and it might be that some other locations offer significant potential
for heat networks due to their local context, support from the local authority, and 'buy in' from
developers. 
2. Consultations and Representations 
Neighbour notification was undertaken in accordance with statutory requirements, and the
application was advertised in local newspaper. One letter of objection was received, the
points raised in which are summarised below: 
1. The red line boundary of the application site includes land used as the car park for the
neighbouring sporting goods distribution warehouse. 
Response: Following discussion with the applicants and their agent, the red line boundary
has been adjusted so that it only includes the residential development and not any part of
Amer Sport's site.  The site area has been slightly reduced to exclude the route for the
private access which is to be formed independently of the planning application under
permitted development rights. 
2. The proposed residential development would be located close to neighbouring sporting
goods distribution warehouse which could lead to conflict between these two neighbouring
land uses. In particular the sporting goods distribution warehouse operates 24 hours a day
so there could be noise concerns for residents of the proposed development. 
Response: An acoustic barrier would be provided along the boundary between the
proposed residential development and Amer Sports.   
Consultations 
NAC Active Travel and Transportation: Initially objected due to the proposals for houses
to face directly onto Crompton Way with no in-curtilage parking. It was considered that this
would have led to excessive on-street parking on Crompton Way and potential road safety
issues. In addition, it was not considered that the initial internal roads layout complied with
Designing Streets. Following several discussions with the applicants, the above issues were
addressed and the layout amended, and NAC Active Travel and Transportation has
therefore removed the objection. A number of small remaining issues can be addressed at
the Roads Construction Consent phase. 
Response: Changes have since been made to the layout to address the concerns of NAC
Active Travel and Transportation. 
NAC Environmental Health: No objections, however there are reservations with regards to
the impact of the effect of the noise from existing commercial undertakings on the proposed
development. Environmental Health recommend a number of conditions relating to noise,
remediation, contamination and air quality.

Page 13

Response: Such conditions could be applied to any planning permission which may be
granted. 
NAC Flooding: No objections, subject to conditions relating to the surface water drainage
system. 
Response: Such conditions could be applied to any planning permission which may be
granted. 
NAC Education: No objection. The proposal is for 60 units in the catchment of Glebe and St
John Ogilvie primary schools.  It is expected that this would generate up to 19 children and
this is within the capacity of these schools. 
Response: Noted. 
The Coal Authority: No objections, however, recommend an informative be placed on any
planning permission with regards to coal mining hazards. 
Response: Such an informative could be applied to any planning permission which may be
granted. 
Glasgow Prestwick Airport: No objections. 
Response: Noted. 
Scottish Environmental Protection Agency (SEPA): The proposal does not meet the
threshold for SEPA consultation. 
Response: Noted. 
Scottish Water: No objections 
Response: Noted. 
West of Scotland Archaeological Service (WOSAS): The land has previously been
developed and there is therefore unlikely to be significant archaeological remains. No
objection. 
Response: Noted. 
3. Analysis
Strategic Policy 1 (Towns and villages objective) of the LDP states that the Council wants to
provide the right new homes in the right places. Policy 1: New Homes and Maintaining an
Effective Housing Land Supply, of the LDP states that we will in principle support and
promote residential development of the 51 effective housing supply sites shown in
Schedules 2a and 2b of the LDP. The site is part of the North Newmoor Industrial Estate
housing site as listed in Schedule 2b of the LDP. The site has an indicative capacity of 260
units.

Page 14

There have been two consented developments in the North Newmoor site, one of which is
completed (17/00581/PPM) and one of which is being developed (19/00908/PPM). The
proposed development would occupy the final part of the North Newmoor housing site. The
total number of units already consented is 290 and the proposed development would bring
the total number of units in North Newmoor to 350, which would be some 90 units above the
indicative capacity. It is not however considered that the proposed development would be
overdevelopment of the site as the density of the site would be approx. 30 dwellings per
hectare, which is considered to be an acceptable density for a suburban housing site. The
previously consented developments were similarly not considered to be overdevelopment.
The proposed development accords with Policy 1: New Homes and Maintaining an Effective
Housing Land Supply and The Towns and Villages Objective of Strategic Policy 1: Spatial
Strategy. 
Strategic Policy 2: Placemaking states that all development proposals must meet the
qualities of successful places as outlined in the policy. The proposed development
incorporates 6 house types including terraced, semi-detached, and detached houses. All
the houses would have two storeys with gabled roof designs. The housing developments to
the north consist of similar house types with similar finishing materials. The design of the
proposed development is consistent within the immediate context. It is considered
appropriate to attach a condition which would require further details with regards to the
external finishes to ensure the final choice of materials is appropriate for the locality and
contains enough variety to provide visual intertest. 
The development layout consists of a network of small, interconnected blocks which would
promote a pedestrian friendly environment and provide attractive enclosed streetscapes.
The street layout would be similar to the other developments to the north and would create
consistency for the entire North Newmoor development. Unfortunately, whilst the case
officer sought to create a pedestrian link from the proposed development to the
development to the north, this was not agreed by the developer of the site to the north.
Notwithstanding, it is considered that the proposed layout has adequate connectivity with
the surrounding streetscape and would create an environment that is easy to move within
and beyond. The case officer secured design improvements to ensure that the houses on
the perimeter of the development face onto Crompton Way and Arkwright Way. This layout
would ensure that the development aligns with the existing streetscape and provide an
attractive and welcoming frontage to existing streets. 
No significant areas of amenity space have been proposed within the development site
itself. There would be open space at the SuDS basin and over the gas main wayleave.
There would be a small area of amenity space in the north of the development as well as a
playground across the bridge over the A78 approx. 200m from the site. All houses within the
development would have private gardens enclosed by 1.8m high timber fences.  Given this
locational context, the site is considered to be well served for open and amenity spaces. Full
details of landscaping and boundary treatments could be ensured via a planning condition.   
The layout of the site has been designed in order to ensure that the houses would not have
their privacy or access to daylight affected through overlooking or overshadowing from other
properties. An acoustic barrier would be provided along the eastern boundary of the site
with Amer Sports. Full details of the design of this barrier would be required via a planning
condition. All houses would be provided with two parking spaces, the majority of which are
located in-curtilage. Visitor parking would be spread evenly throughout the site.  In

Page 15

conclusion, the proposed development meets with the qualities of successful places and
therefore accords with Strategic Policy 2: Placemaking. 
Policy 2: Regeneration Opportunities, states that we will in principle support and promote
the development of brownfield land within our settlements where that development aligns
with the placemaking policy. The site was formerly occupied by an industrial/warehouse
building however this was demolished some years ago and therefore the site can be
considered as a brownfield site. The North Newmoor area was formerly an industrial estate,
however, with the recent residential development it is now a mixed-use area between
residential and the remaining industrial/warehouse uses. As highlighted above, the
development accords with the placemaking policy, and therefore it also accords with Policy
2: Regeneration Opportunities. 
Policy 22 of the LDP states that development will be required to ensure no unacceptable
adverse impact on the water environment. Development should ensure that appropriately
sized buffer strips are maintained between the built and water environments. Related to this
issue is Policy 23, which deals with flood risk management. Taking both of these polices
together, there are not any watercourses which run through or adjacent to the site, and the
nearest watercourse is the Annick Water approx. 450m to the south of the site. The site is
not considered to be at particular risk of flooding. The proposal includes a SuDS basin in the
northwest concern of the site. Full details of the surface water drainage arrangements can
be ensured via condition. Foul water drainage is proposed to tie in with the existing Scottish
Water sewer at Crompton Way. The development accords with Policies 22 and 23. 
Policy 27 relates to sustainable transport and active travel. The North Newmoor area is
located in between two busy roads (the A78 and B7080). There are footbridges over these
roads on either side, the footbridge to the west providing access towards Irvine town centre
and the footbridge to the east providing access to Bourtreehill and Girdle Toll. In terms of
public transport, the nearest bus stop is 400m away and Irvine train station is about 2km
away. Overall, the site is reasonably well served by public and active travel links, and the
internal design of the site has been reconfigured to enhance access to these linkages for the
convenience of future residents of the area. Two parking spaces have been provided per
dwelling plus additional visitor parking, and this level of parking provision is supported, given
the suburban location. The proposal is considered to accord with Policy 27 Sustainable
Transport and Active Travel. 
Policy 29: Energy Infrastructure Developments, requires that all proposals for new buildings
demonstrate that at least 10% of the current carbon emission reduction targets set by
Scottish Building Standards are met through the use of low or zero carbon generating
technologies. No details have been provided by the applicant to demonstrate how this
requirement will be met. It is considered that a suitably worded condition could ensure that
any development would accord with Policy 29: Energy Infrastructure Developments. 
Policy 31 relates to future proofing for heat networks. The proposed development would
utilise modern building designs which would minimise the energy requirements for heating
through modern insulation. The houses have been oriented to take advantage of solar gain
where possible. The site is not considered to be a suitable candidate for a district heating
system. The proposal accords with Policy 31. 
In conclusion, the proposal is in accordance with the relevant polices of the LDP, and the
development would entail the delivery of the final section of a major housing site, which has

Page 16

been identified and allocated as part of the local development plan process.  Accordingly,
the application is recommended for approval subject to the conditions referred to in this
report. 
4. Full Recommendation 
Approved subject to Conditions 
Reasons for Decision 
Condition 
1. That prior to the commencement of the development hereby approved, the developer
shall provide full details of the proposed finishing materials for the written approval of North
Ayrshire Council as Planning Authority. Thereafter, the development shall progress in
accordance with such details as may be approved. 
Reason
In order to ensure that the finishing materials are high quality and attractive; in the
interest of the visual amenity of the area. 
Condition 
2. That prior to the commencement of the development hereby approved, the developer
shall provide full details of the proposed boundary treatments for the written approval
of North Ayrshire Council as Planning Authority. Thereafter, the development shall
progress in accordance with such details as may be approved. 
Reason
In order to ensure that the appearance of the boundary treatments is acceptable; in
the interest of the visual amenity of the area. 
Condition 
3. That no development shall take place until there has been submitted to and approved
by North Ayrshire Council as Planning Authority a scheme of landscaping, which
shall include details of species, planting densities, soil treatment and aftercare and
shall include indications of all existing trees and hedgerows on the land and details of
any to be retained together with measures for their protection in the course of the
development. 
Reason 
In order to ensure that the site is appropriately landscaped, in the interest of amenity. 
Condition 
4. That all planting, seeding or turfing comprised in the approved details of landscaping
shall be carried out in the first planting season and seeding seasons following the
occupation of the buildings or the completion of the development, whichever is the
sooner; and any trees or plants which, within a period of five years from the
completion of the development die, are removed or become seriously damaged or
diseased shall be replaced in the next planting season with others of a similar size
and species, unless North Ayrshire Council as Planning Authority gives written
consent to any variation.

Page 17

Reason
In order to ensure that the approved landscaping is carried out and maintained, in the
interest of amenity. 
Condition 
5. That prior to the commencement of the development, hereby approved, full details of
the site's surface water drainage system, including the discharge rate, basin
capacity, other temporary storage capacity, water quality treatment measures and
post development flood flow paths shall be submitted for the agreement of North
Ayrshire Council as Planning Authority. Thereafter the agreed details shall be
implemented prior to the completion of the development and maintained thereafter to
the satisfaction of North Ayrshire Council as Planning Authority. 
Reason 
In order to ensure that the development would not lead to flooding. 
Condition 
6. That, prior to the commencement of the development, hereby approved, confirmation
shall be submitted in writing to North Ayrshire Council as Planning Authority and
certified by a suitably qualified person that a surface water drainage system to
manage and treat runoff at the site has been prepared in accordance with the
principles and practices contained in 'The SuDS Manual' (CIRIA report C753,
published November 2015). Thereafter, the certified scheme shall be implemented
prior to the completion of the development and maintained thereafter to the
satisfaction of North Ayrshire Council as Planning Authority. 
Reason 
In order to ensure that the development would not lead to flooding. 
Condition 
7. That prior to the commencement of the development hereby approved, the developer
shall provide full details of the low and zero carbon generating technologies to be
used in the development for the written approval of North Ayrshire Council as
Planning Authority. For the avoidance of doubt, at least 10% of the current carbon
emission reduction targets set by Scottish Building Standards shall be met through
the use of low or zero carbon generating technologies. Thereafter, the development
shall progress in accordance with such details as may be approved. 
Reason 
In recognition of the climate emergency. 
Condition 
8. That prior to the commencement of the development hereby approved, the developer
shall provide full details of the proposed acoustic barrier to be erected between the
development and the Amer Sports warehouse for the written approval of North
Ayrshire Council as Planning Authority. Thereafter, the barrier shall be erected in
accordance with such details as may be approved prior to the first occupation of the
development, and maintained in perpetuity unless otherwise agreed in writing by
North Ayrshire Council as Planning Authority.

Page 18

Reason
In order to ensure that the dwellinghouses hereby approved are not affected by noise
from the neighbouring warehouse; in the interest of amenity. 
Condition 
9. The internal noise level from road traffic during daytime hours (0700-2300 hours) in
any habitable room within any residential property to which this consent relates must
not exceed LAeq 16-hour 35dB. In addition, the internal noise level from road traffic
during night hours (2300-0700 hours) in any habitable room within any residential
property to which this consent relates must not exceed LAeq 8-hour 30dB. If these
levels cannot be achieved with an open window strategy, then alternative means of
ventilation will require to be provided. 
Reason
In order to ensure that the dwellinghouses hereby approved are not affected by road
noise; in the interest of amenity. 
Condition
10. The rated noise level, as defined in BS4142, from any existing or consented
commercial undertakings at the time of consent (excluding noise from fixed plant or
equipment during night hours), must not exceed the background noise level by
5dB(A) or more at the curtilage of any of the proposed dwelling houses. For the
avoidance of doubt, there will be no onus on any existing or consented legitimate
commercial undertaking to modify, amend or curtail their existing procedures or
working arrangements and responsibility for ensuring any occupier of any of the
consented dwellings is not subjected to a statutory noise or dust nuisance in terms of
Section 79 of the Environmental Protection Act 1990 rests with the developer as the
"agent of change". 
Reason
In order to ensure that the dwellinghouses hereby approved are not affected by noise
from commercial undertakings; in the interest of amenity. 
Condition
11. During night hours (2300-0700 hours) the noise from fixed plant and equipment
associated with existing or consented commercial undertakings must not exceed the
levels specified in NR 25 as detailed in BS8233 in any habitable room within any
residential property to which this consent relates. Compliance with this condition
must be met with windows open in a typical manner for ventilation.  For the
avoidance of doubt, there will be no onus on any existing or consented legitimate
commercial undertaking to modify, amend or curtail their existing procedures or
working arrangements and responsibility for ensuring any occupier of any of the
consented dwellings is not subjected to a statutory noise or dust nuisance in terms of
Section 79 of the Environmental Protection Act 1990 rests with the developer as the
"agent of change". 
Reason
In order to ensure that the dwellinghouses hereby approved are not affected by noise
from fixed plant; in the interest of amenity. 
Condition

Page 19

12. That prior to the commencement of the development, the applicants shall finalise the
ground investigation report submitted in support of the application by JPB Reference
Number VG190-18/SAG/MAK Draft Issue and dated December 2021 and submit a
Remediation Strategy. All documentation shall be verified by a suitably qualified
Environmental Consultant and submitted to the satisfaction of North Ayrshire Council
as Planning Authority. On completion of the proposed works written verification,
detailing what was done by way of any remediation, shall also be submitted. 
Reason 
In order to ensure that the site is suitably remediated, in the interest of public health. 
Condition
13. That the presence of any significant unsuspected contamination that becomes
evident during the development of the site shall be brought to the attention of North
Ayrshire Council Environmental Health. Thereafter a suitable investigation strategy
as agreed with North Ayrshire Council shall be implemented and any necessary
remediation works carried out prior to any further development taking place on the
site, all to the satisfaction of North Ayrshire Council as Planning Authority. 
Reason
In order to ensure that any contamination is dealt with is an appropriate manner, in
the interest of public health. 
Condition
14. The applicant must demonstrate that the increased road traffic, generated as a result
of this development, shall not have a detrimental effect on the local air quality or
result in an increase in concentrations of atmospheric pollutants such that statutory
Air Quality Objectives would be exceeded at any location of relevant public exposure. 
Reason
In order to ensure the development would not negatively affect the air quality in the
area, in the interest of public health. 
James Miller 
Chief Planning Officer           
For further information please contact Mr John Mack, on 01294 324794.

Page 20

Appendix 1 – Location Plan           
DO NOT SCALE Reproduced from the Ordnance Survey mapping with the permission of the Controller of Her Majesty’s Stationery
Office © Crown Copyright.  Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings.
North Ayrshire Council Licence Number 100023393.