NORTH AYRSHIRE COUNCIL 
28th August 2024 
Planning Committee 
Locality Garnock Valley
Reference 23/00838/PPM
Application Registered 13th November 2023
Decision Due 13th March 2024
Ward Garnock Valley 
Recommendation Approved subject to Conditions 
Location Site To West of Auldlea Gardens, Beith
Applicant Persimmon Homes & Source LNH Ltd
Proposal Erection of 191 dwellinghouses with associated
infrastructure and landscaping 
1. Description 
Planning permission is sought for the erection of 191 dwellinghouses with associated works
including access, parking, landscaping, open spaces and sustainable drainage (SuDS) on
an allocated greenfield site adjacent to Kings Road within the settlement boundary of Beith.
The site has an area of just under 7 hectares and slopes downhill from east to west towards
Kings Road from a high point of approximately 74m AOD at its eastern boundary to a low
point of 55m AOD in the west, a fall of some 17m across a distance of 280m (a gradient of
6%). The site consists of two agricultural fields bisected by a field ditch. The ditch is edged
with a hedgerow and some trees, although there are gaps in places. The boundary onto
Kings Road is defined by a well maintained hawthorn hedgerow. Access is currently
provided by a field gate from Kings Road. The current land use is agricultural grazing.
To the north of the site is an established woodland corridor known as the Mossneuk Strip,
which is a plantation consisting of coniferous and broadleaved trees some 26m in width.
Beyond the Mossneuk Strip are the estate grounds of Woodside Castle, which comprises a
combination of open grassland and woodland.

Page 2

To the east are the residential areas of Auldlea Gardens and Ash Drive, both at a higher
ground level than the application site. To the south is the old Beith Cemetery, which is
edged by a stone wall varying in height from 3m to 4m. The site is bounded to the
southwest/west by Kings Road and Woodside South Lodge. On the west side of Kings
Road is the detached cottage of Mossneuk and agricultural land which slopes very gradually
downhill towards the west. The Glasgow - Ayr railway line is around 650m to the west, with
Kilbirnie Loch beyond. Beith town centre is accessed from Kings Road and is approximately
800m southeast. 
The proposed development would have a single point of vehicular access from Kings Road
at the low point of the site, midway between the old Beith cemetery and
Mossneuk/Woodside South Lodge. There would also be a separate pedestrian footpath
connection onto the existing pedestrian footway alongside Kings Road at the southwest
corner of the site. 
The site layout would take the form of a series of interconnected streets to the north and
south of the field ditch, which would be retained in its current form. From the entrance at
Kings Road, a street would run in an easterly direction leading towards a street some 200m
in length on a north-south axis. The southern leg of this street would loop around to the east,
bisected by a short connecting road. The northern leg would cross the ditch, the setting of
which would be enhanced as a 'biodiversity corridor'. Within the northern part of the site, a
number of looping streets would be formed on north-south and east-west axes. In total,
there would be two bridges over the ditch. Visitor parking would be provided throughout the
site. 
All houses within the development would have two storeys. A total of 16 house designs (or
'types') are proposed. The housing mix includes 103 detached, 54 semi-detached and 34
terraced homes. Most homes would have either 3 or 4 bedrooms, and 16 would have 2
bedrooms. The proposed housing designs have all been developed by the applicant at their
other recent projects in North Ayrshire. The houses typically have steep roof slopes with
gable ends. Some would have gable features to the front and/or roof canopies over front
doors. The applicant has proposed that external finishes would be finished in a combination
of render and red or buff brick. All roofs would be finished with grey tiles and all homes
would have mono-block driveways. Solar PV panels would be provided on all roofs (and
positioned on the most appropriate slope to maximise daylight/solar gain). Front gardens
would be open plan with rear gardens enclosed with 1.8m high timber fences. 
The development would provide two play areas for children: one for toddlers, the other for
older children. A larger area of grassed open space would be provided at the centre of the
site suitable for ball games. Landscaping would be added to the fringes of the field ditch,
much of which would be overlooked by footpaths from the front of houses. There would be a
landscaped buffer area provided at the boundary with Woodside Lodge as well as planting
throughout the site. A SuDS detention basin would be provided to the south of the access
road at the lowest point in the site. 
The following supporting information was submitted with the application:
- Pre-application Consultation (PAC) Report
- Design and Access Statement
- Planning Statement
- Ecology Report

Page 3

- Flood Risk Assessment
- Tree Report
- Transport Assessment
- Sustainability Statement
- Energy Statement
- Statement on Community Benefit 
In terms of the adopted Local Development Plan (LDP), the application site is within a
General Urban area of Beith and identified in Schedule 2b as a Housing Site anticipated to
become active between 2019-2024 (ref. NA1117), with an indicative capacity of 175 units.
The relevant policies of the LDP to the proposed development are listed below: 
- The Towns and Villages Objective of Strategic Policy 1: Spatial Strategy
- Strategic Policy 2 (Placemaking)
- Policy 1: New Houses and Maintaining an Effective Housing Land Supply
- Policy 15: Landscape and Seascape
- Policy 16: Protection of our Designated Sites
- Policy 18: Forestry, Woodland, Trees and Hedgerows
- Policy 22: Water Environment Quality
- Policy 23: Flood Risk Management
- Policy 27: Sustainable Transport and Active Travel
- Policy 31: Future Proofing for Heat Networks 
National Planning Framework 4 is also relevant to the consideration of the application since
this is part of the development plan. 
2. Consultations and Representations
Neighbour notification was undertaken for the application in accordance with statutory
procedures, which involved 26 letters being sent to all addresses within 20m of the site. The
application was also advertised in a local newspaper, the Ardrossan & Saltcoats Herald. 
A total of 11 representations were received. These consisted of 9 objections, 1 in support
and 1 neutral with comments. The matters raised are summarised and responded to below: 
1. Concerns have been raised about the capacity of the local community to support the
additional population which the proposed development could result in. These concerns
range from getting an appointment at the local health centre/GP surgery and dentist, to
school and nursery places for children. It has been noted that Persimmon themselves
have stated that there is a declining population in Beith (based on census data). As such,
the planning authority should take into consideration whether or not the application can be
granted if that means there is also declining demand for housing against a background of
capacity constraints in health and education services. There is also concern that the
development of the site could lead to degradation of the countryside as a result of
insufficient recreational facilities and waste management. 
Response: The Local Development Plan highlights that the forecasted decline and ageing
of North Ayrshire's population is a key issue which affects the area and that building new
homes is an important response to counter the serious challenges this poses. The Plan
identified that the 2016 population of the Garnock Valley was 20,128 and that the under 18
population had fallen by over 11% since the 2011 census. Whilst the results of the 2022
census have not yet been published in detail, it is known that the population of North
Ayrshire as a whole has continued to decline during the past decade. A falling and ageing
population tends to be associated with a decline in local service provision, less demand for

Page 4

education and youth services and fewer local employment opportunities. Additionally, an
ageing population typically results in increased demand for health and social care services. 
Whilst the population level and its demographics are affected by many factors other than
housebuilding, the Local Development Plan provides sites for up to 4000 new houses
across North Ayrshire during the 2020s. As noted above, the application site is allocated for
housing development. Consultation has been carried out with the local education authority,
who indicated that there is sufficient capacity to serve the proposed development within all
of the schools which serve Beith (see below). In addition, NHS Ayrshire & Arran has
confirmed that an options appraisal for the planned replacement of Beith Health Centre will
now take place. 
The determination of a planning application for a planned housing development on an
allocated site is not contingent on the availability or recruitment of staff to provide health and
social services: the staffing of these services are not land use planning matters and are
outwith the control of the Council as planning authority. 
Accordingly, little or no weight should be attached to these issues in the decision making
process given that the application site has been allocated for housing development since
2014 within the context of a strategic planning policy which seeks to address a declining
population. The population of the Garnock Valley area in particular has declined at a greater
rate than other parts of North Ayrshire. 
With respect to points raised about insufficient recreational opportunities, it is not agreed
that this is the case. The proposed development would provide small areas of open space
for play as well as a number of walking routes. Within reasonable walking distance of the
site (10 minutes), there is a public park which is well equipped with opportunities for play
and recreation. In addition, there are various other sports and community facilities within the
town. The surrounding area provides numerous opportunities for a variety of outdoor
recreation and sporting activities, including Garnock Community Campus, Lochshore Park,
Kilbirnie Loch and Clyde Muirshiel Regional Park. 
Finally, with regard to the point raised about waste management, the housing would be
provided with refuse and recycling bins in accordance with established standards. The
Council also provides bulky goods uplift services for domestic premises and there is a civic
recycling site at Paddockholm Road in nearby Kilbirnie. There is no reason, therefore, to
suggest that the development would lead to an increase in fly-tipping or degradation of the
countryside as a result of insufficient waste management facilities. 
2. The development would result in additional traffic on Kings Road, within the town and
on other rural roads. This would have implications for road safety, congestion and traffic
flow. There are already many parked cars along one side of Kings Road for some of its
length, which can be exacerbated when there are funerals taking place. 
Response: As noted above, the site is allocated for housing development in the adopted
Local Development Plan. As such, it is acknowledged that the proposed development would
result in additional vehicle movements, particularly on Kings Road. This would vary over
time: initially the traffic would be associated with construction, typically involving larger
commercial vehicles and cars/vans used by construction workers. It is anticipated that most,
if not all, construction traffic would require to enter the site from the south (ie. from Beith).
This is due to the constraints associated with the Kerse Road, including the low bridge on
the A760 south of Lochwinnoch and at the tight bends around the railway overbridge
adjacent to Kilbirnie Loch. It is recommended that a Construction Environmental
Management Plan is attached as a condition of planning permission in order to take
construction traffic impacts into account during the course of developing the site. In the

Page 5

longer term, traffic would primarily consist of cars, smaller delivery vehicles and refuse
collection lorries. 
The developer has been made aware of the representations regarding potential impacts on
Kings Road and has met with representatives of the Roads Authority. It is proposed to
extend the 30mph speed limit past the site to reduce vehicle speeds. 
Finally, it should be noted that there is a car park at the cemetery with capacity for around 12
cars. 
3. The initial plan from Persimmon featured a roundabout, but this was later retracted.
The planning authority should consider whether that a roundabout should be reinstated
since it will act as a traffic calming measure and would also serve as a potential public
transport turning point. Within the town, there is currently a very limited bus service to
Glasgow, and also a very poor service to the local train station at Glengarnock. With the
proposed development being built in an area where there is no bus-stop within walking
distance for elderly/infirm people, with Wilson Street being the closest which is 0.6 miles
away uphill. 
Response: A roundabout is not a requirement for a development of the scale proposed and
the roads authority has no objection to a priority junction for the proposed site access
following extensive engagement with the applicant. The existing national speed limit (and
signage) would be relocated beyond the proposed access in order to reduce vehicle speeds
on approach to the site. Kings Road is not utilised by public transport at present and it is not
anticipated that it would be an attractive route for bus services whether or not a roundabout
is provided at the site access. The site is within reasonable walking distance of the nearest
bus stops on the B7049 on the edge of the town centre (15 minutes - approximately 1km
from the centre of the site). The provision of a dedicated bus service is not a requirement for
a planning application of this scale. However, the additional population which the proposed
housing may result in has some potential to increase the demand for improvements to bus
services for Beith. This would be a matter for bus operators to consider. 
4. Better footpath links should be included to allow pedestrians easier access to the
town. This would encourage walking to the local shops, etc and cut down on unneeded car
journeys. Between plot 56-57 a footpath link should be provided to connect to the footpath at
the side of 35 Ash Drive. At plot 50-51 a footpath link should be provided to connect to the
existing path at 31 Auldlea Gardens. 
Response: Discussions have taken place with the applicant regarding the potential for other
footpath connections. However, neither of the suggestions made by the representee were
found to be feasible due to intervening third party land between existing adopted footpaths
and the site. There are also considerable ground level changes proposed on the eastern
edge of the site, which would make such connections impractical. It is considered that, on
balance, the proposed pedestrian connection onto Kings Road from the southwestern
corner of the site would be sufficient for a development of the scale proposed. 
5. Has consideration been given to a feasibility study for opening up the former Beith
North train station which is within walking distance of the site? New housing projects in the
west of Scotland have seen stations such as Royston being developed. Dargavel Village
has also seen the improvements to the railway on the Greenock-Glasgow route. 
Response: Network Rail has no plans for redeveloping the former Beith North Station, which
closed in 1951 and was subsequently dismantled. For comparison, the development of
Dargavel Village at Bishopton will have 4,000 homes once completed, and is served by the
adjoining Bishopton railway station (which existed beforehand). Service levels are a matter

Page 6

for ScotRail and the Council has no control over this. The nearest stations to the site at
Glengarnock and Lochwinnoch are currently served by two trains per hour to/from Glasgow.
There is a regular bus service from Beith to Glengarnock. 
6. The addition of 191 houses will significantly impact on the tranquillity of our
countryside. Furthermore, the introduction of excessive artificial lighting will disrupt the
natural darkness of our surroundings, potentially disturbing local wildlife. Noise impacts are
also of concern. 
Response: The site has been allocated for housing development in the Local Development
Plan since 2014. The site adjoins the town and is not considered to be in an isolated location
nor a sporadic development within the countryside. The use of low power LED street
lighting with full cut-off lamps is standard for all new developments in North Ayrshire with the
aim of reducing glare and light spill beyond the area intended to be lit. It is therefore
considered that street lighting in the development and on Kings Road would be kept to the
minimum possible level for the safety of pedestrians and traffic, in accordance with current
Council policy. It is not considered that the proposed development would result in excessive
nor unacceptable noise generation, either from the housing nor from road traffic. 
7. Impact on climate arising from heating systems. It would surely be better for the
planning authority to insist on ground source heat pumps or even a district heating system. 
Response: In a development of this type and scale, the option for ground source heating is
constrained by cost. There is no reliable source of heat near to the site which could be
utilised for the development of a district heating system. Such systems are better suited to
much larger sites or 'whole town' networks. 
The heat and power systems for the proposed houses would involve a combination of
renewables and other sources supplied from existing networks. The houses would require
to meet high standards of insulation and energy efficiency, all of which would be determined
by the building standards regime rather than through the planning system. This 'fabric first'
approach is intended to reduce the long term environmental impact (and operating costs) of
heating systems. 
Individual householders would have permitted development rights to modify or upgrade
heat and power systems over time as new technologies become more affordable and
available. 
8. Impact on wildlife/nature arising from the development. 
Response: The site is currently used for cattle grazing and has limited biodiversity or habitat
value, other than the hedgerows along the edges of the fields. Sections of hedgerow would
be retained wherever possible. The proposed development would incorporate landscaping
which would be maintained as part of a factoring scheme for the common grounds. It is
recommended that the selection of nature positive species for the landscaping scheme
would be a condition of the planning permission. This would include appropriate riparian
planting along the banks of the watercourse which bisects the site, as well as the retention
of existing hedgerows as far as possible. 
9. RSPB Scotland requests that measures are taken to ensure that swift nest bricks are
incorporated into this proposed development as a biodiversity enhancement. Planning
authorities have a duty under the Nature Conservation (Scotland) Act 2004 to further the
conservation of biodiversity.

Page 7

Response: As part of a wider package of nature positive measures, the applicant is willing to
install swift nest bricks as a condition of planning permission. It is important to note that swift
bricks would be offered to prospective purchasers as an option, and would not be
compulsory. 
10. Impact on flood risk and concerns about sewage overflow in the event of pumping
station failure. The existing water course on the site has a history of causing flooding in the
lower half of the field and in the neighbouring property, with potential implications for the
proposed development. Measures in place to address the current flooding issue, run-off
concerns and the potential failure of the effluent pumping system dedicated to the estate are
not clear. Clarity on responsibility for repairs and the long-term impact on tenants'
obligations is crucial. 
Response: Following the submission of additional information after further investigation,
modelling and studies were carried out by the applicant's consulting engineers, both the
NAC Flooding Officer and SEPA have no objection to the proposed development. This has
been confirmed in revised consultation responses dated 26th March 2024 and 22nd April
2024 respectively. Conditions have been recommended. See below for the responses. 
11. Impact on overlooking of existing housing and adverse impacts on quality of life as a
result of this. Bungalows should be on offer as part of the housing mix especially on the
edges of the site where there is greater potential for overlooking. 
Response: There are two existing houses in the countryside immediately to the west of the
site. One backs on to the application site, the other is across Kings Road, facing towards the
site. The rear of the house which is immediately adjacent would be screened with new tree
planting and landscaping where there is potential for direct overlooking. The house that is
further from the site would be separated by Kings Road, the retained hedgerow and new
planting within the development. Given that this house has its front elevation facing the
public road, it is not considered that the need for more extensive landscape screening is
necessary since its rear elevation would remain private and hidden from public view, as at
present. 
It is acknowledged that the current appearance of the hillside would dramatically change as
a result of the proposed development. Proposed cut and fill operations for the site have
been provided in a detailed plan which indicates that the eastern part of the site (at the top of
the hillside) would be lowered in depth by as much as 2.5m in places, thus reducing the
'crest' of the development when viewed from the west. The existing housing estate to the
east would therefore retain an outlook over the development across the Garnock Valley
towards the Renfrew Heights. 
The southern part of the site would also be lowered by up to 1.8m in places, thus reducing
the visual impact when viewed from the old cemetery to the south. (The cemetery wall
varies between 3m and 4m in height). There would be some land raising particularly around
the western part of the site, the intention of which is to reduce the gradients of the streets,
assist drainage flows, and thus reduce the rate of surface water run-off into the drainage
system. The highest level of SuDS detention basin would not be raised above existing
ground levels, thus reducing the risk of over-topping onto the adjacent land. 
The developer does not offer bungalows as part of their proposed housing mix, and there is
no planning policy requirement for single storey homes. The proposed housing mix would
be consistent with other developments provided by the same developer in North Ayrshire
during recent years.

Page 8

12. Impact of the development on Mossneuk woodland strip to the north of the site
boundary. 
Response: The rear boundaries of the proposed houses adjacent to the Mossneuk
woodland strip would consist of 1.8m fences. It is considered that this type of boundary
would be sufficient to restrict/deter access north of the site. The woodland provides a buffer
between the north of the site and the countryside beyond. The Mossneuk woodland is not
within the control of the applicant and its future management/maintenance is therefore
outwith the scope of the planning application. 
13. Impact of the development on category A listed Woodside House and its setting. A
bund, 3m in height and planted with native trees/shrubs, should be provided within the
northern part of the site to screen the development from the Woodside Estate. 
Response: Woodside House is a category A listed building that is located some 450m
north of the site. It is largely screened by established woodland, including the Mossneuk
woodland strip as well as other pockets of mature woodland and trees. Given the
distance and intervening trees/woodland, it is not considered that the proposed
development would have any adverse impacts on the setting of Woodside House nor any
significant impacts on the wider estate around it. There is no justification for the formation
of a bund along the northern boundary of the site. Landscaping is proposed for other
parts of the site which would enhance the setting of the development. 
Consultations 
NAC Active Travel and Transport - no objection following extensive engagement with the
applicant on the proposed access arrangements, consideration of impacts on Kings Road,
street design and parking matters. 
Response - Noted. 
NAC Education - no objection. The roll projections for the 4 catchment schools (Beith and
St Bridget's PS, Garnock Community Campus and St Matthew's Academy) have been
checked. There appears to be sufficient capacity to accommodate the expected number of
children from this development. 
Response: Noted. 
NAC Environmental Health - no objections to the development. Conditions are
recommended in respect of air quality associated with road traffic; a desk study for potential
contamination on the land; the use of suitable (clean) fill materials in land engineering
operations and for notification to the local authority in the event of unsuspected
contamination being discovered during 
development. Further observations are made in relation to a range of other Environmental
Health matters. 
Response: The above matters could be dealt by the recommended conditions in the event
of planning permission being granted. 
NAC Flooding Officer - On review of the additional information submitted on 13th March
2024, there are no objections subject to conditions. Comments were made regarding
drainage design, including the effects on the ditch within the site in the event of the culvert
below Kings Road being blocked. The outstanding details could be obtained via planning
condition.

Page 9

Response: The above matters could be dealt by the recommended condition in the event of
planning permission being granted.
Scottish Water - no objection. The applicant should be made aware that a consultation
response does not confirm that the proposed development can currently be serviced.
Further comments for are provided on water supply and waste water capacity. It is
highlighted that there is live infrastructure in the proximity of the development area that may
impact on existing Scottish Water assets - a 300mm combined sewer and a 225mm surface
water drain at the edge of the site boundary. The applicant must identify any potential
conflicts with Scottish Water assets and contact the Asset Impact Team for an appraisal of
the proposed development.
Response: An informative note could be added to any planning consent granted instructing
the applicant to contact Scottish Water regarding the matters raised. 
SEPA - On review of additional information submitted on 13th March 2024, there are no
objections to the proposed development on flooding grounds. This follows the submission of
a holding objection dated 12th December 2023, the matters raised in which have been fully
addressed and resolved by the applicants. 
Response: Noted. 
West of Scotland Archaeology Service (WoSAS) - advise that the application site lies in
an area of some archaeological potential based on the presence of recorded sites in the
surrounding landscape. A condition is recommended to require investigation of potential
archaeology below the site in the form of a written scheme of investigation followed by a
programme of archaeological works prior to the initial stages of groundworks. 
Response: Noted. A condition could be attached to investigate the matter as per the
recommendation of WoSAS. 
Beith & District Community Council - no comments. 
3. Analysis 
To accord with the provisions of the Town and Country Planning (Scotland) Act 1997, the
application requires to be determined in accordance with the development plan unless
material considerations indicate otherwise. Each relevant development plan policy is
considered individually below. 
Strategic Policy 1: Spatial Strategy and Policy 1: New Homes and Maintaining an
Effective Housing Land Supply
The Towns and Villages Objective of Strategic Policy 1 (Spatial Strategy) states that, in
principle, the Council will support development proposals within North Ayrshire's towns and
villages that provide the right new homes in the right places. Policy 1 (New Homes and
Maintaining an Effective Housing Land Supply) states that, in principle, the Council will
support and promote residential development of the 51 effective housing supply sites
identified in Schedules 2a and 2b. As noted above, this particular site is listed under
Schedule 2b (ref. NA1117) and has an indicative capacity of 175 units.

Page 10

Whilst the proposed development would have 191 houses, which is 16 greater than the
indicative capacity, at a density of 27.2 per hectare, it is not considered that development
would result in the over-development of the land. As such it is considered that the proposed
development accords with Strategic Policy 1 and Policy 1 of the LDP. 
Strategic Policy 2: Placemaking
The stated purpose of Strategic Policy 2 on Placemaking is to ensure "all development
contributes to making quality places." The policy also seeks to "safeguard, and where
possible enhances environmental quality through the avoidance of adverse environmental
or amenity impacts." 
The proposed development would provide a variety of house designs (16 in total) including
terraced, semi-detached and detached houses. This would add positively to the range and
choice of homes in Beith. All houses within the development would have 2 storeys with
gabled roof designs and a consistent pattern of external finishes throughout the
development. 
It is considered that the development would relate well to the nearby Auldlea Gardens
estate which was completed in 2019 by Laurel Homes, and consists of 2 storey detached
and semi-detached homes of modern design finished with grey roofs and white render.
Auldlea Gardens is sited on higher ground to the east of the application site and would not
experience any adverse privacy or overlooking impacts from the proposed development.
The older (1960s) housing to the southeast of the application site is separated by a common
parking court which is edged with mature hedgerow planting. It is not considered that the
proposed development would have any adverse impacts on the amenity of the existing
housing to the east of the site. 
The two nearest houses to the west of the site, Woodside South Lodge and Mossneuk, date
from the nineteenth century. Woodside South Lodge is a category C listed building and is
situated at the entrance to the driveway leading to Woodside House. The proposed
development includes mounding with landscaping in order to create a buffer between the
new housing and the rear curtilage of Woodside South Lodge. It is considered that the
mounding and planting would have a beneficial effect on the privacy of Woodside South
Lodge. It is considered that the setting of the listed building would be unharmed by the
development, as its front curtilage and principal elevation faces onto the driveway for
Woodside House and away from the application site. Mossneuk, on the opposite side of
Kings Road, is further from the nearest housing proposed within the site and would have its
rear curtilage screened by the house itself. 
A condition could be attached to any grant of planning permission requiring the submission
of finalised details of external finishes in the interests of the amenity of the area. 
The proposed street layout has taken into account the western aspect of the site which
provides outstanding views towards the valley and the Renfrew Heights beyond, thus
enhancing the relationship of the development with its wider landscape setting.
In terms of its functionality, the proposed street layout is considered acceptable. There
would be one access road for vehicles, including pedestrian footways. There would be two
additional pedestrian footpath connections onto Kings Road. The houses along the western
boundary of the site would face toward Kings Road, with an intervening landscaped area
which would create an attractive and welcoming edge to the development on the outskirts of

Page 11

the town. The applicant has stated that existing hedgerows would be retained and
enhanced where possible. 
The proposed layout and boundary treatments would provide each house with a rear garden
area of adequate size and enclosures to ensure that there would be no adverse privacy or
overlooking between residents. Each house would also be provided with in-curtilage parking
to ensure that there would be no adverse parking impacts on the new streets within the
development. In addition, there would be visitor parking spaces distributed throughout the
development. 
The applicant submitted a Statement of Energy and an associated Sustainability Statement
as part of the application to demonstrate the resource efficiency of the proposed
development. Whilst the development would use energy efficient gas fired combi boilers
with integrated flue gas heat recovery for their primary heating system, the Statement of
Energy advises that the development would achieve over 8.5% improvement on the
relevant Scottish Technical Standards (Section 6 Carbon Emission minimum
standards/Section 7 Aspect 1 Silver) and with a 10.17% contribution from low and zero
carbon generating technologies. The site layout has been designed to maximise southwest
and southeast facing aspects with predominantly vertical window proportions.
Approximately
2.5kwp solar (photovoltaic) panels per dwelling have been included in the submitted
scheme, with the potential for householders to increase the number in the future. 
Furthermore, the Statement of Energy highlights the 'fabric first' measures which would be
taken in the design and construction of the housing to maximise energy efficiency.
Measures would include, but are not limited to:
- reducing heat loss through highly insulated building fabric, including limiting the
window sizes;
- reducing thermal (cold) bridging;
- ensuring adequate cross ventilation in association with openable windows to enable
air changing and to prevent overheating in hot weather. 
In addition, the homes would benefit from energy efficient lighting; thermostatically/timer
controlled high efficiency heat and hot water generators (with consideration being given to
several new technologies including air source heat pumps); waste water heat recovery;
extractor fans to provide good internal air quality throughout the year and EV charging
points for every house, as standard. The solar panels alone would, it is estimated, provide
over 14% of the site's energy requirement. All houses would have gabled roof designs
which would maximise the potential space available for solar panels. 
The proposed development would provide a range of internal and outdoor spaces that could
be adapted in the future to meet the needs of the residents. The site would be extensively
landscaped in the interests of amenity and biodiversity. 
It is considered that the site would be well connected for a variety of transport modes. There
would be path connections formed throughout the site as well as links onto the existing
footway on Kings Road. As noted above, Kings Road is within walking distance of many of
the local facilities in Beith. 
Therefore, given the above, it is considered that the proposed development would meet the
relevant requirements of Strategic Policy (Placemaking).

Page 12

Policy 15: Landscape and Seascape
As noted above, the site is located within a local landscape character area. Policy 15 states
that the Council will support development that protects and/or enhances our
landscape/seascape character avoiding unacceptable adverse impacts on our designated
and non-designated landscape area and features. In this particular case, it is noted that the
site is allocated for residential development in the LDP and therefore the principle of the
development of the site for housing has been established, notwithstanding the above
designation. 
As noted above, the site consists of two sloping agricultural fields edged with hawthorn
hedgerows with woodland to the north. The applicant has stated that existing hedgerows
along the boundary of the site would be retained and enhanced where possible. The trees
beyond the north boundary of the site would not be affected by the development. 
The field ditch through the centre of the site would be retained and enhanced with additional
planting to provide ecological and amenity benefits for the site. 
Several areas of open space would be provided, including two equipped play areas for
children as well as a larger area of grass. 
A scheme of landscaping and planting would take place throughout the development,
including new landscaping along the western edge where the site adjoins Kings Road. 
As such, it is not considered that the proposed development would have any significant
adverse impact on the local landscape character area and has been designed in
accordance with Policy 15. 
Policy 16: Protection of our Designated Sites and Policy 18: Forestry, Woodland,
Trees and Hedgerows
In terms of Policies 16 and 18, the site is not subject to any environmental designations of
local or national importance. However, a Preliminary Ecological Assessment (PEA) has
been submitted providing a detailed assessment of the environmental features of the site
and its surroundings, the preparation of which followed desktop and site surveys. 
The findings of the survey indicate that there were no protected species present nor nesting
places, bat roosts, badger setts, etc. The hedgerows on the site are noted as being of
potential importance as a food source for birds, insects and as wildlife corridors. 
The PEA states "with the limitations on habitat as it currently stands, focus can be given to
creating a landscape around and through the development that increases biodiversity
value." It is considered that this would be an appropriate response to the opportunities
which the proposed landscaping scheme provides. Various recommendations have been
made in this respect. Implementation of the recommendations of the PEA could be secured
by condition. With such measures in place, it is considered that the proposed development
would accord with the above policies. 
Policy 22: Water Environment Quality and Policy 23: Flood Risk Management.
Policy 22 states that development will be required to ensure no unacceptable adverse
impact on the water environment. Development should ensure that appropriately sized
buffer strips are maintained between the built and water environments. Related to this issue
is Policy 23, which deals with flood risk management and states that generally development
should avoid locations of flood risk and should not lead to significant increase in the flood

Page 13

risk elsewhere. The site is located outwith the flood risk area defined by NPF4 and the
submitted Flood Risk Assessment finds that the site would be at a very low risk of flooding
from the nearby watercourse at present and in the future. Following initial holding
objections, SEPA and NAC Flooding have no objection to the proposed development
subject to recommended conditions relating to the surface water runoff systems and the
drainage infrastructure. As such, it is considered that the development accords with Policies
22 and 23. 
Policy 27: Sustainable Transport and Active Travel
As noted above under Strategic Policy 2, the site is considered well connected for walking to
the local facilities in Beith and for private car travel. The applicant has prepared a
Sustainability Statement which, among other things, demonstrates the range of existing
local facilities accessible on foot from the site, including bus services. As such, it is
considered that the development accords with Policy 27. 
Policy 31: Future Proofing for Heat Networks
The above policy supports proposals for the creation or enhancement of district heat
networks in as many locations as possible in North Ayrshire. The applicant's Sustainability
Statement notes that the application site is not considered to be a suitable candidate for a
district heating system at present, since there are no existing or proposed heat sources
available nearby (ie. within 1km) which could be utilised for this purpose. 
NPF4
Finally, turning to NPF4, the applicant has provided a statement which appraises the
proposed development against the spatial framework and the relevant national policies. It is
considered that that, in principle, the proposed development accords with the spatial
strategy of NPF4 in that it would provide a new residential development on an allocated site.
NPF4 is broadly in alignment with the LDP in respect of its other strategic policy objectives,
including those tackling the climate and nature crises. 
As noted above, several mitigation and enhancement measures have been recommended
in the submitted PEA including the retention and enhancement of existing hedgerows where
possible. Areas of public open space, landscaping and planting would be provided
throughout the site and a SuDS detention basin provided to mitigate the rate of surface
water run-off in conjunction with other sustainable drainage measures. A condition could be
attached to require the implementation of the PEA recommendations during the
development of the site. This would ensure that the principles set out in NPF4 for nature are
implemented. Similarly, the submitted Sustainability Statement sets out how the proposed
development would utilise low and zero carbon generating technologies to reduce carbon
emissions. Finally, the proposed footpath links onto Kings Road would support active travel
for a variety of purposes. Footpath connections would provide access to both the
countryside and the town, and would thus create opportunities for local living. In summary, it
is considered that the proposed development has considered the climate emergency, would
be 'nature positive' and would accord with NPF4. 
There are no other material considerations. In conclusion, it is considered the proposed
development would accord with the development plan. Accordingly, it is recommended that
planning permission is granted subject to the conditions noted below.
4. Full Recommendation

Page 14

Approved subject to Conditions
Reasons for Decision
Condition
1. That the development hereby approved shall be implemented in accordance with the
submitted plans, drawings and recommendations contained in the application (inclusive of
all associated supporting documentation) unless otherwise indicated below, all to the
satisfaction of North Ayrshire Council as Planning Authority. 
Reason
To secure the implementation of the development in accordance with the supporting
information. 
Condition
2. That prior to the commencement of the development hereby approved, the applicant
shall submit a Construction Environmental Management Plan for the written approval of
North Ayrshire Council as Planning Authority. Thereafter, the development shall be
implemented in accordance with such details as may be approved to the satisfaction of
North Ayrshire Council as Planning Authority. 
Reason
In the interests of environmental protection during the construction phase. 
Condition
3. That no development shall take place until the applicant has secured the
implementation of a programme of archaeological works in accordance with a written
scheme of investigation to be submitted by the applicant, agreed by the West of Scotland
Archaeology Service, and approved by North Ayrshire Council as Planning Authority.
Thereafter, the applicant shall ensure that the programme of archaeological works is fully
implemented and that all recording and recovery of archaeological resources within the
development site is undertaken to the satisfaction of the Planning Authority in agreement
with the West of Scotland Archaeology Service. 
Reason
To ensure any archaeological remains below the ground are investigated and
recorded/recovered before the development commences. 
Condition
4. That prior to the commencement of the development hereby approved, the applicant
shall undertake a desk study of the application site, (including the review of any previous
site investigations) to assess the likelihood of contamination and assist in the design of an
appropriate site investigation and subsequent suitable quantitative risk assessment.
Remediation proposals shall also be presented in relation to any significant findings. All
documentation shall be verified by a suitably qualified Environmental Consultant and
submitted to the satisfaction of North Ayrshire Council as Planning Authority. 
Reason
In the interests of environmental protection prior to and during the construction
phase.

Page 15

Condition
5. That, if there is a requirement to re-use site won material and/or to import material
then the assessment criteria and sampling frequency that would adequately demonstrate its
suitability for use shall be submitted to and approved by North Ayrshire Council as Planning
Authority prior to any material being used. In addition, any fill material to be used in the top
300mm shall also be free from metals, plastic, wood, glass, tarmac, paper, and odours and
in accordance with BS3882:2015 and BS8601:2013. On completion of the works and at a
time and or phasing agreed by the Planning Authority, the developer shall submit a
verification report containing details of the source of the material and appropriate test results
to demonstrate its suitability for use within residential development. 
Reason
In the interests of environmental protection during the construction phase. 
Condition
6. That prior to the commencement of the development hereby approved, the following
additional details shall be submitted for the written approval of North Ayrshire Council as
Planning Authority: 
- the drainage design schedules shall be accompanied with a short summary report
(ie. an explanatory paragraph);
- written confirmation that the predicted flood depths would not prevent vehicular
access and egress to/from the development at times up to and during a 1 in 200 year (plus
climate change) flood event. Flood depths shall be included in the written statement.
- written confirmation that the ditches and open channels shall be adequately
maintained to safeguard against flooding during the lifespan of the development hereby
approved
- a written statement in respect of the design and maintenance of acceptable flood flow
paths, especially from the Kings Road culvert
- a plan showing the exceedance flow paths of the drainage network 
For the avoidance of doubt, the finalised surface water drainage scheme shall accord with
the principles and practices contained in 'The SuDS Manual' (CIRIA report C753, published
November 2015). Thereafter, the details as may be approved shall be implemented prior to
the completion of the development and maintained thereafter to the satisfaction of North
Ayrshire Council as Planning Authority. 
Reason
To ensure that the development would not lead to flooding and in the interests of
sustainable drainage. 
Condition
7. That prior to the commencement of any housebuilding operations, the developer
shall provide full details of the proposed finishing materials to be used for the written
approval of North Ayrshire Council as Planning Authority. Thereafter, the development shall
progress in accordance with such details as may be approved. 
Reason

Page 16

To ensure that the finishing materials are of high quality and attractive in the interest
of the visual amenity of the area. 
Condition
8. That prior to the commencement of any housebuilding operations, the developer
shall provide final details of the boundary treatments for the written approval of North
Ayrshire Council as Planning Authority. Thereafter, the development shall progress in
accordance with such details as may be approved to the satisfaction of North Ayrshire
Council as Planning Authority. 
Reason
To ensure that the boundary treatments are appropriately sited and designed in the
interest of the visual amenity of the area. 
Condition
9. That prior to the commencement of any housebuilding operations, the developer
shall provide details of swift nesting boxes to be installed within the development along with
a method statement for the written approval of North Ayrshire Council as Planning Authority.
Thereafter, the development shall progress in accordance with such details as may be
approved. 
Reason
To provide nesting opportunities for swifts within the development where it is
appropriate to do so. 
Condition
10. That all planting, seeding or turfing comprised in the approved details of landscaping
shall be carried out on a progressive (phase by phase) basis during the first planting season
and seeding seasons following the construction of each phase within the development until
its completion. Any trees, plants or areas of seeding which, within a period of five years from
planting die, are removed or become seriously damaged or diseased shall be replaced in
the next planting season until established, unless North Ayrshire Council as Planning
Authority gives written consent to any variation. 
Reason
To ensure that the approved landscaping is carried out and maintained, in the
interest of amenity and biodiversity. 
Allan Finlayson
Chief Planning Officer 
For further information please contact Mr A Hume Planning Officer on 01294 324318.

Page 17

Appendix 1 – Location Plan 
DO NOT SCALE Reproduced from the Ordnance Survey mapping with the permission of the Controller of His Majesty’s Stationery
Office © Crown Copyright. Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings.
North Ayrshire Council Licence Number AC0000825715.