Page 1

ARGYLL AND BUTE COUNCIL 
DEVELOPMENT AND ECONOMIC GROWTH 
PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE 
UPDATE ON RECENT SCOTTISH MINISTERS SECTION 36 NARACHAN WIND FARM
DECISION 
_________________________________________________________________________  
OUR REFERENCE:  20/00212/S36 
ECU REFERENCE:  ECU00001884  
DPEA REFERENCE: WIN-130-6    
CASE DETAIL: ERECTION OF 11 TURBINES OF UP TO 180M TO BLADE TIP AND    
ASSOCIATED INFRASTRUCTURE
SITE ADDRESS: NARACHAN HILL, LAND EAST OF TAYINLOAN    
APPLICANT:  ENERGIEKONTOR UK LTD 
STATUS:   REFUSED BY SCOTTISH MINISTERS ON 8TH MARCH 2024 
_______________________________________________________________________  
1. INTRODUCTION 
1.1 In Scotland, any application to construct or operate an onshore power generating 
station, with an installed capacity of over 50 megawatts (MW) requires the consent of 
Scottish Ministers under Section 36 of the Electricity Act 1989. Any ministerial 
authorisation given includes a ‘deemed planning permission’ and in these   
circumstances there is then no requirement for a planning application to be made to 
the Council as Planning Authority. The Council’s role in this process is one of a 
consultee along with various other consultation bodies. It is open to the Council to 
either support or object to the proposal, and to recommend conditions it would wish 
to see imposed if authorisation is given by the Scottish Government.   
1.2 Argyll & Bute Council did not object to this application, consequently, a Public Inquiry 
was not required on these grounds. However, the Electricity Act provides that where 
the Scottish Ministers are not required to cause a Public Inquiry to be held, if other 
objections have been received, they shall be considered together with all other 
material considerations by the Scottish Ministers with a view to determining 
whether a Public Inquiry should be held. NatureScot, a statutory consultee, 
objected to the proposed development on the basis of the significant adverse 
daytime and night time effects it would have on the  Special Qualities of the North 
Arran National Scenic Area.  The Applicant disagreed that the NSA would be 
compromised.  The Scottish Ministers decided that while the proposed   
Development has the potential to make a valuable contribution to renewable 
energy targets, the importance of the NSA and the desirability of safeguarding its 
character was a significant consideration. Consequently, Ministers considered that it 
was appropriate to cause a Public Inquiry to be held. 
1.3 The Inquiry, which Officers participated in was conducted by a Reporter(s) appointed 
by the Directorate for Planning and Environmental Appeals (14th – 17th March 
2023).

Page 2

1.4 This report summarises the decision made by Scottish Ministers to REFUSE 
Section 36 consent and deemed planning permission for Narachan wind farm. 
2. RECOMMENDATION 
2.1 Members are asked to note the contents of the report. 
3. REPORTERS CONCLUSIONS AND RECOMMENDATION TO SCOTTISH 
MINISTERS          
Reporter’s Conclusions 
3.1 It is clear that there is now increased support within national policy and guidance for 
onshore wind developments in order to meet net zero ambitions and address the 
climate and nature crises.  This proposal would make a valuable contribution towards 
meeting national and UK renewable energy targets, tackling climate change and 
achieving net zero.  In particular, it would assist in the “mission critical” delivery of 
onshore wind towards the Scottish Government’s target of 20 GW of installed 
onshore wind capacity by 2030.  As a proposal having National Development 
status these benefits are of national importance. 
3.2 National policy also gives support to such developments where net economic impact, 
including local and community socio-economic benefits would be maximised.  It is 
predicted that during the construction phase the proposal would have short term, 
minor, beneficial socio-economic effects at the regional and national scale and would 
have minor adverse effects on tourism.  However, no assessment was made of the 
significance of the longer term direct and indirect socio-economic effects and it has not 
been demonstrated that local economic benefits would be maximised. 
3.3 The policy context of NPF4 and OWPS make it clear that larger turbines are to be now 
expected.  While NPF4 gives strong support for onshore wind developments outwith 
National Scenic Areas and recognises that significant landscape and visual impacts 
are to be expected it does not suggest that such effects will always be acceptable. 
3.4 Where impacts are localised and/or appropriate design mitigation has been applied, 
they will generally be considered to be acceptable. 
3.5 The Reporter concluded that there would be significant adverse daytime visual and 
cumulative effects and there would be potential for short term effects on residential 
properties due to construction noise.  These effects would remain even with mitigation 
in place, albeit the construction effects would be short term. 
3.6 The Reporter found that the daytime significant visual and cumulative effects would 
not be sufficient to constitute an evident and material change to the special landscape 
qualities of the North Arran NSA.  However, the Reporter concluded that the effects of 
the aviation lighting as proposed, would have significant adverse effects on the special 
landscape qualities of the North Arran NSA and would compromise the integrity and 
objectives of the designation of the NSA.  The Reporter was not satisfied that the 
applicant’s proposed aviation lighting would mitigate the adverse effects on the NSA. 
3.7 The effects of the wind farm as currently proposed would be neither localised nor 
mitigated.  In order to comply with NPF4 Policy 4 ii) the significant adverse effects on 
the NSA require to be clearly outweighed by social, environmental or economic 
benefits of national importance.

Page 3

3.8 The NSA is a resource of recognised national importance.  NatureScot recommends 
a cautious approach be taken given the uncertainties involved in relation to the 
mitigation of aviation lighting. As the specialist advisors to the Scottish Ministers on 
landscape and natural heritage matters, the Reporter gives weight to NatureScots 
position on that matter. 
3.9 NatureScot places particular importance upon this NSA due to its proximity and 
accessibility to the main centres of population and the combination of high scenic 
quality and wildness which is considered to be unusual in a south of Scotland context. 
While the Reporter acknowledges the high scenic quality of this NSA there is no 
hierarchy of importance that applies to these designated areas.  The proposal requires 
to be considered in terms of its effects upon this particular NSA. 
3.10 In balancing the factors for and against the proposal it is the Reporters conclusion that 
the effects of the proposed aviation lighting would be sufficiently adverse that they 
would outweigh the positive aspects of the proposal, including those of national 
importance.  However, the Reporter is satisfied that the incorporation of an Aircraft 
Detection Lighting Scheme would acceptably mitigate those effects.  Therefore the 
Reporter recommended that consent be granted subject to a suspensive planning 
condition requiring that the aviation lighting to be used at this wind farm shall 
incorporate and utilise an aircraft detection lighting system. 
3.11 The Reporter acknowledged that there could potentially be a delay in obtaining 
approval from the CAA for such aviation lighting.  The Reporter considered that a delay 
in implementing the consent, if granted by Ministers, would be outweighed by the 
importance of protecting the NSA.  Any need to vary the five years commencement 
period is permitted within the terms of the proposed conditions, subject to the approval 
of the Scottish Ministers. 
3.12 Should Ministers disagree with the Reporters findings regarding the requirement for an 
aircraft detection lighting system then it is the Reporters recommendation that consent 
be refused.                                             
Reporters Recommendation to Scottish Ministers 
3.13 The Reporter recommended that consent should be granted under section 36 of the 
Electricity Act 1989 and planning permission should be deemed to be granted under 
section 57 of the Town and Country Planning (Scotland) Act 1997 (as amended), 
subject to the conditions listed in Appendix 1.  Consent may not be granted prior to the 
satisfactory completion of an Appropriate Assessment in relation to the effects of the 
proposal on the Kintyre Goose Roosts Special Protection Area.  
4.0 The Scottish Ministers’ Conclusions 
Reasoned Conclusions on the Environment 
4.1 The Scottish Ministers are satisfied that the EIA Report and its AI 2021, AI 2022 and 
SEI have been produced in accordance with the EIA Regulations, and that the relevant 
procedures regarding publicity and consultation laid down in those Regulations have 
been followed. 
4.2 The Scottish Ministers have fully considered the EIA Report, AI 2021, AI 2022, the 
consultation responses, representations, the findings, conclusions, and 
recommendation of the PI Report and are satisfied that the environmental impacts of

Page 4

the proposed Development have been sufficiently assessed. The Scottish Ministers 
have taken the environmental information into account when reaching their decision. 
4.3 Taking the above assessment into account the Scottish Ministers consider that the 
proposed Development would have significant adverse localised landscape impacts 
and significant visual and cumulative impacts that go beyond localised which cannot 
be mitigated. There are also significant impacts on the SQs of the North Arran NSA as 
a consequence of the proposed Development’s aviation lighting which are not 
mitigated by the currently proposed aviation lighting scheme. 
4.4 The Scottish Ministers are satisfied, having regard to current knowledge and methods 
of assessment, that this reasoned conclusion addresses the likely significant effects of 
the proposed Development on the environment. The Scottish Ministers are satisfied 
that this reasoned conclusion is up to date. 
The Scottish Ministers Determination 
4.5 As set out above, the seriousness of climate change, its potential effects and the 
need  to cut carbon dioxide emissions, remain a priority for the Scottish Ministers. 
Scotland’s  renewable energy and climate change targets, energy policies and 
planning policies  are all relevant considerations when weighing up the proposed 
Development. NPF4,  Scotland’s Energy Strategy and the Onshore Wind Policy 
Statement make it clear that  renewable energy deployment remains a priority of the 
Scottish Government. These  are all matters which should be afforded significant 
weight in favour of the proposed  Development. 
4.6 The Scottish Ministers consider that the proposed Development, if deployed, would 
create net economic benefits and deliver renewable energy benefits that would 
contribute to supporting climate change mitigation and are wholly in accordance with 
Scottish Government’s climate change ambitions. The proposed Development in these 
respects would contribute to sustainable development and this has been taken into 
account when reaching a decision. These benefits however must be considered 
carefully in the context of the negative impacts on the natural environment and whether 
or not, on balance, they are acceptable. 
4.7 The Scottish Ministers acknowledge, in accordance with both NPF4 and the OWPS, 
that meeting our climate ambitions will require a rapid transformation across all 
sectors of our economy and society, however this does not negate the continuing 
requirement to ensure that the right development happens in the right place. 
4.8 The Scottish Ministers, having considered the Application, the EIA Report, AI 2021, 
AI 2022, SEI, consultation responses and public representations alongside the 
Reporter’s considerations and subsequent conclusions, consider that although the 
significant visual impacts of the proposed Development would be overall outweighed 
when balanced against the net economic benefits and the renewable energy benefits
that would be delivered if the proposed Development were to be deployed, the
significant adverse effects on the SQs of the North Arran NSA would not. The Scottish
Ministers do not consider that the social, environmental or economic benefits of the
proposed Development can be construed as significant or nationally important to the
extent that they clearly outweigh the significant adverse effects on the SQs for which
the North Arran NSA has been designated. 
4.9 The Scottish Ministers have carefully considered the option of imposing a suspensive 
condition to secure the installation of an ADLS, prior to construction of the proposed 
Development, but do not find that the evidence provided to date on the matter affords

Page 5

sufficient assurance that either method would be capable of being installed on the 
proposed Development within the next 5 years. As such, taking account of the 
resulting uncertainty on timescales for the deployment of the proposed Development 
if it were to be consented, the Scottish Ministers consider it would not be appropriate 
in this case to impose the suspensive condition proposed by the Reporter to mitigate 
the effects of the proposed Development’s lighting on the SQs of the North Arran 
NSA. 
4.10 This leads the Scottish Ministers to the conclusion that despite the many factors in 
favour of the proposed Development this is not the right Development in the right 
place and the proposed Development is therefore not acceptable overall. 
4.11 The Scottish Ministers therefore consider the Application for consent under Section 
36 of the Electricity Act 1989 for the construction and operation of Narachan Wind 
Farm,  wholly within the planning authority area of Argyll & Bute Council, should be 
refused. 
4.12 The Scottish Ministers' decision is final, subject to the right of any aggrieved person 
to apply to the Court of Session for judicial review. Judicial review is the   
mechanism by which the Court of Session supervises the exercise of administrative 
functions, including how the Scottish Ministers exercise their statutory function to 
determine applications for consent. 
4.13 The Reporters Inquiry Report and Scottish Ministers decision can be viewed on the 
DPEA (Directorate of Planning Environmental Appeals) website at the following 
link:    
Scottish Government - DPEA - Case Details (scotland.gov.uk)    
5.0 IMPLICATIONS 
Policy: None. 
Financial: None.   
Personnel: None    
Equal Opportunities: None 
Author:  Arlene Knox  Date: 29th April 2024 
Fergus Murray 