NORTH AYRSHIRE COUNCIL 
29 October 2025 
Planning Committee 
Title:    Garnock Valley Local Place Plan 
Purpose:  To advise Members on the preparation and submission of a
Local Place Plan by the Garnock Valley Local Place Plan
Working Group. 
Recommendation:  It is recommended that the Planning Committee: 
1) agrees to the registration of the Local Place Plan for
Garnock Valley submitted by the Garnock Valley Working
Group, and 
2) notes the requirement to take account of the plan in the
preparation of North Ayrshire’s third Local Development Plan
(LDP3). 
1. Executive Summary 
1.1 The Planning (Scotland) Act 2019 introduced a new right for communities to produce
Local Place Plans (LPPs): community-led plans setting out proposals for the
development and use of land and buildings. The aim of LPPs is to enhance
engagement in development planning by empowering communities to play a proactive
role in defining the future of their places. Planning authorities must take account of
registered Local Place Plans when preparing a Local Development Plan. 
1.2 A working group consisting of seven Garnock Valley community groups and some
individual members was set up in the summer of 2023 to prepare a Local Place Plan.
Radio City Association was also involved in part of the process during 2024. 
The seven groups which form the Working Groups are: 
• Beith & District Community Council
• Beith Community Development Trust
• Dalry Community Council
• Dalry Community Development Hub
• Dalry Community Sprots Club
• Garnock Valley Youth Forum
• Kilbirnie & Glengarnock Community Council

Page 2

1.3 The Working Group submitted a Local Place Plan to the North Ayrshire Council on 26
September 2025. It is considered that members of the Garnock Valley Working Group
meet the definition of a ‘community body’ and that the Working Group has complied
with the requirements concerning the form and content of a Local Place Plan; the
steps to be taken before submission; and provided the information required by the
legislation and regulations. Accordingly, North Ayrshire Council as planning authority
should accept the Local Place Plan as valid and proceed to register the plan. 
2. Background 
2.1 The legislative requirements for the preparation, submission and registration of Local
Place Plans are set out in the Town and Country Planning (Scotland) Act 1997 as
amended by the Planning (Scotland) Act 2019 and the Town and Country Planning
(Local Place Plan) (Scotland) Regulations 2021. Local Place Plans are part of the
Scottish Government’s wider work on planning reform and implementation of the 2019
Act, including steps to reduce conflict, improve community engagement and build
public trust in planning matters. They offer the opportunity for a community-led,
collaborative approach to creating great local places. It is vital that local people can
engage meaningfully and have a positive influence in the future planning of
development in their areas. The aim of LPPs is to significantly enhance engagement
in development planning, effectively empowering communities to play a proactive role
in defining the future of their places. 
2.2  The Act and Regulations set out the minimum requirements for of the preparation,
form and content and submission of Local Place Plans. LPPs may be prepared by a
‘Community Body’ defined as a community-controlled body within the definition given
in section 19 of the Community Empowerment (Scotland) Act 2015 or a community
council established in accordance with Part 4 of the Local Government (Scotland) Act
1973. LPPs must set out and map proposals as to the development or use of land and
have regard to certain documents. Prior to submission the community body preparing
the Local Place Plan must prepare an ‘information notice’ for local councillors and
relevant community councils and finally should set out the level and nature of
community support for the plan. 
2.3 Following the preparation of ‘Place Frameworks’ for Kilwinning, Largs and Saltcoats,
supported by the UK Government’s Community Renewal Fund and the Scottish
Government’s Place Based Investment Programme (PBIP), early engagement was
undertaken with community bodies in the Garnock Valley with the view to preparing a
Local Place Plan. Preparation of the Plan was overseen by a Working Group which
was formed in Summer 2023, and support provided by North Ayrshire Council’s
Regeneration and Connected Communities teams and the Planning Service. The
Garnock Valley Working Group submitted a Local Place Plan to the Council for the
Garnock Valley on 26 September 2025. 
Garnock Valley Local Place Plan Proposals 
2.4  A copy of the Local Place Plan for Garnock Valley submitted by the Working Group is
provided at Appendix 1. It is not the role of the planning authority at this point to
assess the proposals contained within the LPP for their planning merit or deliverability,
however, the Plan’s proposals for the development and use of land are summarised at
Appendix 2. A summary of the proposals is as follows:

Page 3

• Renovation, reuse, or redevelopment of key sites across the Garnock Valley with
a focus on community use and town centre living (see Appendix 2: Summary of
Local Place Proposals for site details).
• Retention and enhancement of key buildings across the Garnock Valley (see
Appendix 2: Summary of Local Place Proposals for site details).
• Consider forming Community Hubs at key locations such as St. Margaret’s
Church, Dalry; Beith Astro; Kilbirnie and Glengarnock Library; Walker Hall and
Kilbirnie Job Centre
• Create an Enterprise Hub with retirement living at Geilsland House/ Speirs in
Beith.
• Development package on derelict site within Barmill to incorporate Community
Centre.
• Create masterplan for Beith for future expansion in relation to Housing. 
• Create masterplan for The Cross, Dalry.
• Identify/ prioritise affordable/ specialist housing across the Garnock Valley.
• Re-instate Beith North Railway Station
• Road improvements including implement A737 bypass improvements, improve
pedestrian safety and crossings at various locations. 
• Improve NCN7 connections including reopening Ladeside footbridge.
• Improve and create walking and cycling routes and create linkages between
settlements and key locations including Riverside walkway improvements.
• Create a nature conservation area on land in Kilbirnie.
• Improvements to park and greenspaces
• Extend Clyde Muirshiel Regional Park to include Kilbirnie Loch.
• Create outdoor event space at Lynn Holm, Dalry.
• Create community led arts project at former toilet Bridge Street, Kilbirnie
• Improve water sports facilities at Lochshore. 
Registration 
2.5 When a planning authority receives a Local Place Plan it should acknowledge receipt
of the plan and check it whether it is valid. A valid LPP is one which a) has been
prepared by a Community Body; b) is a proposal as to the development and use of
land; and c) fulfils the legal requirements set out in the 1997 Act and the 2021
Regulations. If these three conditions are met, then the planning authority must accept
the Local Place Plan as valid and proceed to register it. 
2.6 The Planning Service proposes to take a ‘light touch’ approach to the interpretation of
the legislative requirements and has liaised with the Garnock Valley Working Group  
and their consultant to clarify that the submitted LPP meets the requirements of a valid
Local Place Plan. It is adjudged that the Local Place Plan for the Garnock Valley,
submitted by the Garnock Valley Working Group is a valid LPP and should be
registered. 
2.7 Every planning authority must keep a register of Local Place Plans and make publicly
available a map that shows the land to which the Local Place Plans in their register of
Local Place Plans relate. When a valid Local Place Plan is submitted by a community
body, it must be included in the register and the community body that submitted the
plan informed that it has been registered. The register and map must be available for
inspection by the public free of charge at all reasonable hours at an office of the

Page 4

planning authority and on a website maintained for that purpose. North Ayrshire’s
Register of Local Place Plans is available to view at: Local Place Plans. 
Other Local Place Plans 
2.8   In accordance with the legislation, an ‘invitation to prepare a Local Place Plan’ was
published on 19 May 2023 and sent directly to community councils and to community
groups via locality planning partnerships. Community bodies intending to prepare a
Local Place Plan were invited to submit a ‘notice of intention to prepare a Local Place
Plan’ by completing an online form. 
2.9 To date, the Planning Committee has agreed to the registration of five Local Place
Plans: for West Kilbride, Seamill, Portencross submitted by West Kilbride Community
Council; for Stevenston, submitted by Stevenston Community Council; for Largs
submitted by Largs Community Council; for Cumbrae, submitted by Cumbrae
Community Council; and for Fairlie, submitted by Fairlie Community Council. 
2.9 In addition, Skelmorlie Community Council and Skelmorlie Environment Trust have
indicated an interest in jointly preparing a Local Place Plan. 
2.10 The Planning Service will continue to support community bodies seeking to progress a
Local Place Plan on an individual basis, as required or requested. This includes
providing flexibility around the deadline for submitting a Local Place Plan. The
intention is to allow community bodies the time they require to complete and submit a
valid Local Place Plan so that it may be considered in the preparation of North
Ayrshire’s third local development plan. 
3. Proposals 
3.1 It is recommended that the Planning Committee agrees to the registration of a Local
Place Plan for Garnock Valley submitted by the Garnock Valley Working Group and
notes the requirement to take account of the plan in the preparation of North
Ayrshire’s third Local Development Plan (LDP3). 
4. Implications/Socio-economic Duty 
Financial 
4.1  None. 
Human Resources 
4.2  None. 
Legal 
4.3  The legislative requirements for the preparation, submission and registration of Local
Place Plans are set out in the Town and Country Planning (Scotland) Act 1997 as
amended by the Planning (Scotland) Act 2019 and the Town and Country Planning
(Local Place Plan) (Scotland) Regulations 2021. 
Equality/Socio-economic

Page 5

4.4  The Council is required to take account of registered Local Place Plans in the
preparation of North Ayrshire’s third Local Development Plan (LDP3) which will be
subject of an equalities impact assessment and assessment on the impact of the plan
on children. 
Environmental and Sustainability 
4.5  The Council is required to take account of registered Local Place Plans in the
preparation of North Ayrshire’s third Local Development Plan (LDP3) which will be
subject of a Strategic Environmental Assessment and Habitat Regulations Appraisal. 
Key Priorities 
4.6   Communities and Local Democracy are one of four interlinked and interdependent
priorities set out in the Council Plan (2023-28). The preparation of Local Place Plans by
community bodies are a means of enabling local communities to be active in the
preparation of North Ayrshire’s next Local Development Plan and placemaking
approaches.   
Community Wealth Building 
4.7   The plan seeks to put Community Wealth Building and community empowerment into
practice and proposes applying Community Wealth Building principles in construction
projects to benefit local construction industry and create local training & employment
opportunities. 
5. Consultation 
5.1    While there is no legal requirement for a Community Body to engage with the wider
community in the preparation of a Local Place Plan, it is however required to include a
statement setting out its view of the level and nature of support for the Local Place
Plan and the basis on which it has reached that view, including a description of any
consultation in respect of the proposed plan. 
5.2 Extensive community engagement was conducted prior to and during the preparation
of the Garnock Valley Local Place Plan. Stage 1 of the consultation began with
collating existing surveys and consultation from the past ten years to gather
information that was already available, and a survey was delivered to every household
and business in the Garnock Valley during the summer of 2024. Interviews and group
discussions took place with key groups, organisations and businesses such as
Garnock Valley Youth Forum and Garnock Valley Disability Forum. 
5.3 Stage 2 of the consultation process consisted of community events in all the Garnock
Valley settlements with school workshops also carried out. After this a draft plan was
prepared in Spring 2025. Appendix 1: The Garnock Valley Local Place Plan contains
full details and appendices of the consultation work conducted in preparation of the
Garnock Valley Local Place Plan. 
5.4 The Local Place Plan includes a list of acknowledgements from numerous local
community groups as well as individuals.

Page 6

DAVID W. HAMMOND
Executive Director (Communities and Housing) 
For further information please contact Alistair Gemmell, Strategic Planning Manager, on
01294 324021. 
Background Papers
0

Page 7

GARNOCK VALLEY LOCAL PLACE PLAN
June 2025

Page 8

This plan is online at www.ourgarnockvalley.net and bit.ly/GVLPP2025 
Acknowledgments
Preparation of this Local Place Plan was led by a Working Group
of community organisations (see page 9 and logos on right). 
A big thank you to members of the Working Group and to the
wider public who contributed to the Plan.
The work was made possible with financial and staff assistance
from North Ayrshire Council, supported by the Garnock Valley
Local Partnership and many other local organisations, and
facilitated by a consultancy team comprising Austin-Smith:Lord,
Nick Wright Planning, WAVEParticle, Alex Docherty and
Community Enterprise.
In case of enquiry, please contact nick@nickwrightplanning.co.uk
2
members of the Local Place Plan Working Group:
version date: 9th August 2025

Page 9

CONTENTS
BACKGROUND	 p 4
1 Introduction p 5
2 The bigger picture p 14
WHAT WE’RE AIMING FOR	 p 16
3 Our vision for the future p 17
CALLS FOR ACTION	 p 19
4 Action & decision making p 20
5 Town centres p 24
6 Getting about p 27
7 Community life p 31
8 Parks & public space p 35
9 Housing & population p 38
10 Young people p 40
11 Jobs and business p 41
TOWN & VILLAGE PRIORITIES	 p 43
12 Beith p 44
13 Dalry p 47
14 Kilbirnie & Glengarnock p 50
15 Barrmill, Burnhouse & Gateside p 53
MAKING IT HAPPEN	 p 56
16 Implementation p 57
MAPS    	
1 Plan boundary p 6
2 The wider region p 7
3 Key spatial proposals p 18
4 Getting about p 28
5 Beith p 45
6 Dalry p 46
7 Kilbirnie & Glengarnock p 49
8 Barrmill p 51
9 Burnhouse p 52
10  Gateside p 52
APPENDICES    	
1 Planning policy recommendations
2 Facts and figures about the Garnock Valley
3 Audit of previous work
4 Community survey results
5 Town events
6 Village events
7 Schools workshops
8 Draft Plan consultation responses
9 Potential models for community-led delivery organisation
3

Page 10

4
BACKGROUND
Chapter 1	 INTRODUCTION
Chapter 2	 THE BIGGER PICTURE

Page 11

INTRODUCTION
The Garnock Valley is a great place, with a
huge amount to offer residents, businesses,
investors and visitors.
We have historic towns and beautiful
countryside, lochs and hills.  We are close to
the city and the coast.  We have award-
winning community organisations with
hundreds of members who provide excellent
services and facilities.  We have successful
international, national and local businesses,
many of whom are leaders in their fields.  And
we have bags of heritage and pride.  
We also have persistent challenges including
deprivation, the condition of our town
centres, health and wellbeing, and access to
employment and public services.   
We want to be proactive and tackle those
challenges on the front foot.  That’s what this
Plan is for. 
About this Plan
This Plan is the local community’s manifesto
for the Garnock Valley.  It is ambitious.  It is
also entirely feasible.
The key to implementing the Plan will be local
residents, community organisations and the
public and private sectors working together
positively.   That’s because the Plan should be
seen as a shared agenda for the future -
delivering community priorities and public
agendas such as community-wealth-building,
community empowerment and inclusive
growth. Read more in chapters 4 and 16.
Being ambitious, the Plan won’t be
implemented overnight.  It could take 10
years to deliver.  That’s why the Plan focusses
on the big priorities for the whole of the
Garnock Valley, identified through
community engagement (see chapter 2), so
we have clear long term goals but also some
quick wins and flexibility to respond to new
opportunities.
Implementation and funding 
Although there are no funds in place yet, the
Plan will help us get resources.  Think of it as a
manifesto to put the Garnock Valley in a
better position to secure funding, generate
income and influence how budgets are spent. 
Chapters 4 and 16 have more information.
The Garnock Valley today
The area covered by the Plan is shown on
Maps 1a and 1b on the next two pages. 
Administratively, the Plan covers the three
Community Council areas of Beith & District,
Dalry, and Kilbirnie & Glengarnock.  The area
also corresponds with the Garnock Valley
Locality Partnership and North Ayrshire
Council Ward 2 (Garnock Valley).
Our population is almost exactly 20,000
people, around 15% of the North Ayrshire
total.  Most of those live in the our main
towns: 7,100 in Kilbirnie, 5,800 in Beith and
5,300 in Dalry.  More facts and figures can be
seen later in this chapter and in Appendix 2. 
A summary of our strengths, weaknesses,
opportunities and threats is shown on page 8. 
5
1
WHAT MAKES THIS PLAN DIFFERENT?   
• This Plan is the community’s plan based on
our priorities. 
• The local authority has helped to prepare
the Plan and will support its delivery.
• The Plan delivers national priorities locally.
• This Plan brings together previous
community engagement and plans over the
last decade and new community
engagement, giving it extra kudos.  Think of
it is a “plan of plans”.
• This Plan is also a Local Place Plan, a  new
type of plan to influence future planning
policy and guide future development.

Page 12

No embedded text on this page.

Page 13

No embedded text on this page.

Page 14

By way of
context, the
diagram on the
right contains a
summary of the
Garnock
Valley’s current
strengths and
weaknesses,
and future
opportunities
and threats. 
8
DRAFT
FOR COMMENT
Progressive local authority: community wealth-building
Rail & road links to Glasgow city region & Ayrshire coast
Manufacturing & agricultural traditions
Committed community organisations
Improving educational outcomes
Affordable land & property
Good business location 
Local pride & identity
Landscape setting
Availability of businesses premises
Awareness of the Garnock Valley
Health, deprivation and poverty
Visitor facilities / information
Lack of hotels & restaurants
Bus, walking & cycling links
Apathy & negativity
Town centres
Lochshore and Geilsland 
Community wealth building
Green economy: wind/solar power, agriculture
Visitors: nature, history, outdoor activities 
Affordable land & property: commercial & residential
Proximity to Glasgow city region: jobs, education, leisure,
commuting, investment, visitors, airport
Proximity to other economic opportunities: Hunterston
Strategic Development Area, AMIDS, Ayrshire Growth Deal
Climate emergency
Economic uncertainty
Political will and commitment
Low yield on property investment

Page 15

How this Plan was prepared
Preparation of the Plan was overseen by a
Working Group which was formed in Summer
2023, as described below.
The sequence of community engagement
stages to prepare the Plan are described on
subsequent pages.
All community engagement complied with
the National Standards for Community
Engagement and the Scottish Government’s
draft ‘How To’ Guide on Local Place Plans.
Working Group  
The Working Group’s role was to manage
how the Plan was prepared and ensure that it
reflected community aspirations across the
Garnock Valley.  The Working Group has met
monthly since Summer 2023 to plan and
guide the process of community engagement
- the aiming being to make sure that the Plan
recognisably belongs to everybody in the
Garnock Valley.  
The community organisations which are
currently members of the Working Group are
shown on the right.  Radio City Association
(Kilbirnie) was also a member of the Working
Group for part of the process during 2024,
and the Group had two individual members
(local residents).  Support was provided by
North Ayrshire Council.
If you’re interested in joining or supporting
any of these groups to help deliver this Plan,
they would love to hear from you! 
9
Beith & District Community Council covers Beith, Gateside, Barrmill and Burnhouse. 
It meets on the second Tuesday of each month.  Like other Community Councils, it is
the voice of the local community.  More information and contact details on their
Facebook page.
Beith Community Development Trust regenerates local assets to improve community
health, wellbeing, skills and resources.  Volunteer-led with a strong staff base, they
have delivered many significant projects and activities over the years. More
information and contact details on their website.
Dalry Community Development Hub was established in 2014.  It is based in the town
centre community garden and has delivered Lynn Glen path network, sports and arts
activities, and much else besides.  More information and contact details on their
Facebook page and website.
Dalry Community Sports Club was set up to increase access to sports and leisure
opportunities in and around Dalry.  Over the years, it has created new opportunities to
participate in many different sports and improve their health and wellbeing.  More
information and contact details on their Facebook page.
Dalry Community Council was reformed in 2024.  It meets on the last Tuesday of each
month.  Like other Community Councils, it is the voice of the local community.  More
information and contact details on their Facebook page.
Kilbirnie & Glengarnock Community Council meets on the third Monday of each
month.  Like other Community Councils, it is the voice of the local community.  More
information and contact details on their Facebook page.
Garnock Valley Youth Forum aims to make the Garnock Valley better for young
people.  They meet every Wednesday 6-8pm in the Walker Hall in Kilbirnie, and are
supported by North Ayrshire Council’s youth development team.  More information
here; contact details on their Facebook page.
Working Group: community group members

Page 16

Stage 1: Aspirations  
The first foundation of a good plan is work
that’s already been done.  The Garnock Valley
has had lots of surveys, consultations and
plans over the last decade.  They were
brought together in one place, with analysis
of the persistent challenges and local assets
highlighted in that work (see Appendix 3).
To complement that with an up-to-date
picture of community aspirations for the new
Plan, a survey was delivered to every
household and business in the Garnock Valley
in summer 2024.  The results identified clear
priorities.  See page 12 for more information.
Through stages 1 and 2, interviews and group
discussions also took place with young people
(through the Garnock Valley Youth Forum), a
range of local businesses, Garnock Valley
Disability Forum and other organisations, and
visits to community events.
All this created a strong foundation to
explore how to tackle community aspirations.
Stage 2: Priorities
Attention shifted to community events to
share the aspirations revealed in the first
stage and identity priorities for the Plan.  
The main activities were:
• Town events in Kilbirnie, Beith and Dalry
(see page 13).
• Village events in Barrmill/Burnhouse,
Gateside and Glengarnock (see page 13).
• Schools workshops (see Appendix 7).
The Plan does not include every single
aspiration heard from every person as it was
prepared.  If something is in the Plan, it has
been identified as a priority—identified
through the three engagement stages.
Stage 3: Plan
Based on all the information outlined in
sections 1 and 2 of this report, a draft Plan
was prepared in Spring 2025 and shared for
public feedback (online, hard copy and at
community events).  
Appendix 8 explains that consultation
process in more detail.  It also contains
transcriptions of all responses from the local
community, and explanations of how they
influenced the final Plan that you are reading.
The photographs on the next page give a
flavour of the community engagement
activities that helped to prepare the Plan.
10

Page 17

11
750 survey
responses
500 ebulletin
signups
200 people at          
6 town & village
events
50 pupils from        
8 schools

Page 18

Community survey
The community survey was completed by nearly 750 people.  It aimed to
get a sense of community priorities across the Garnock Valley as a whole
and in individual towns and villages, building on all the previous work
undertaken in the previous decade.
Persistent challenges
The survey identified nine persistent challenges which have come up
again and again over the last 10 years, and asked people which should be
priorities for action by scoring each one from 1 (least important) to 5
(most important).  742 people scored the priorities, which gives a sense
of the persistent challenges faced by local communities:
Tackling those challenges
The survey also asked how to tackle those persistent challenges - across
the Garnock Valley as a whole, and within individual towns and villages.
The results are an essential source of information for decision-makers
about the community’s lived experience, as well as clear indicators of
priorities for the actual Plan - as the example graphic on the right shows.  
Similar infographics for each town/village and full transcriptions of
people’s survey responses can be seen in Appendix 4 or online at
www.ourgarnockvalley.net/home/#survey-results. 
12
The survey asked what should be
done to tackle persistent challenges
across the Garnock Valley as a
whole.  622 people commented.  
The Garnock Valley as a whole
This infographic summarises
the responses suggested by
more than 1 person.  A high
resolution version can be
seen in Appendix 4, which
also contains transcriptions
of all responses.

Page 19

Town and village events
The town events in November 2024 and village events in January 2025
were an opportunity for discussion on how to address the priorities that
emerged from previous work and the community survey.
Analysis of all the Stage 1 results identified seven community priorities:
(Housing emerged as a potential additional priority during the events.) 
Various activities took place during the events to ask people how those
those priorities should be addressed, as illustrated on page 11.  To help
people make informed comment, display boards with key facts and
figures about the Garnock Valley were available (see right). 
More information about the local area is available in North Ayrshire
Council’s Garnock Valley Locality Place Profile (to which people were
signposted at the events and from www.garnockvalley.net) and Garnock
Valley Travel Needs Analysis.
Full transcriptions and images of everyone’s suggestions from the town
and village events can be seen in Appendices 4 & 5 and online at
www.garnockvalley.net. Like the community survey results, they are an
essential source of information about lived experience and aspirations
for decision-making in the Garnock Valley. 
13
TOWN CENTRES   How they look and what they offer
GETTING ABOUT  Public transport, walking and cycling  - within the Garnock
Valley and to other places
COMMUNITY LIFE  Better community spaces, shops, cafes and restaurants -
and more events & activities: e.g. sport, crafts, history, family-friendly, music
YOUNG PEOPLE  More opportunities for our young people: work, play and
having their say in the future of their place
ACTION AND DECISION-MAKING  Stronger community action and pride, more
local decision-making, more responsive public services 
PARKS, STREETS AND SPACES  Managing, maintaining and making the most of
what we have - particularly Lochshore, Geilsland and Dalry public park
JOBS AND BUSINESS  Support local business and jobs
Garnock Valley facts & figures 
To inform people’s discussions and input,
information with key facts and figures about the
Garnock Valley was on display at the town &
village events and at www.garnockvalley.net.  
Thumbnails of the panels are shown adjacent. 
High-resolution versions are in Appendix 2.
People were also signposted to more detailed
information in North Ayrshire Council’s Garnock
Valley Locality Place Profile.

Page 20

THE BIGGER PICTURE
Whilst this Plan is rooted in our community’s
aspirations, it also helps to deliver bigger
goals, for North Ayrshire and for Scotland -
the overall aims of national and local policy.  
This is because:
• It is a legal requirement for Local Place
Plans to “have regard to” national and local
planning policy and locality plans.
• If this Plan aligns with overall national and
local policy aims, it is more likely to be
successful in influencing future policy,
investment and public services.
This Plan’s vision, calls for action and
proposals in chapters 3 to 15 have therefore
been framed as tackling community
aspirations and delivering national and local
policy agendas on the ground.  
This chapter provides a brief overview of
those national and local policy agendas.  It
also constitutes the statement required by
Local Place Planning legislation explaining 1
how the Plan has regard to national and local
planning policy and locality plans.
Government priorities 
Government policy priorities that this Plan
delivers at the community level include:
• Community wealth building &
empowerment
• Climate change
• Health & wellbeing
• Sustainable and resilient communities
The vision, calls for action and proposals in
chapters 3 to 15 of this Plan all seek to deliver
those agendas in the Garnock Valley.  The box
below identifies many of the key documents.
Land-use planning & locality planning
As explained on the left, Local Place Plans
must take account of existing national/local
land-use planning policy and Locality Plans.
In terms of land-use planning, this Plan aims
to deliver the national planning agendas of
creating sustainable, liveable and productive
places as expressed in the two parts of the
‘statutory development plan’: 
• National Planning Framework 4 (NPF4,
adopted 2023)
• North Ayrshire Local Development Plan 2
(LDP2, adopted 2019)
The vision, calls for action and proposals in
chapters 3 to 15 of this Plan will create
"sustainable, liveable and productive places”
as defined in the statutory development plan.
This Local Place Plan also reflects the content
of 2023/24 and 2024/25 Garnock Valley
Locality Plans, as required by Local Place
Planning legislation.  The Locality Plans
prioritise moving around, work and
community, and facilities and amenities - all of
which are also prioritised in this Plan.  The
Locality Plans also propose a Place Plan for
the Garnock Valley (this document) to
influence future strategic policy and
investment. 
The Town and Country Planning (Local Place Plans) (Scotland) Regulations 2021, paragraph 5(d)1
14
2
KEY GOVERNMENT PLANS & STRATEGIES
Click on the titles below for more information:
Ayrshire Regional Economic Strategy
NHS Ayrshire and Arran Delivery Plan
National Performance Framework
National Strategy For Economic Transformation
North Ayrshire Community Learning & Development Plan
North Ayrshire Community Wealth Building Strategy
North Ayrshire Council Plan
North Ayrshire Financial Inclusion Strategy
North Ayrshire Regeneration Delivery Plan
North Ayrshire Vacant and Derelict Land Strategy
North Ayrshire Youth Participation & Citizenship Strategy
Safer North Ayrshire Strategy
Sustainable North Ayrshire Strategy

Page 21

The Place Principle 
The Place Principle is, according to the
Scottish Government, “the overarching
context for place-based working in Scotland”.  
The Principle was adopted by the Scottish
Government and the Convention of Scottish
Local Authorities (COSLA) to guide
collaborative working by the public sector,
service providers and communities.  The
panel on the right explains more.
Linked to the Place Principle are the Place &
Wellbeing Outcomes, which provide “a focus
for where place impacts on the wellbeing of
people and planet". 
This Plan seeks to put the Place Principle and
Place & Wellbeing Outcomes into practice in
the Garnock Valley.  We hope that the Plan
and its delivery are recognised as being at the
forefront of the collaborative and holistic
working described by the Place Principle and
the Place & Wellbeing Outcomes. 
Future policy reviews 
Appendix 1 of the Plan contains suggestions
for the next reviews of local and national
planning policy, as required by Local Place
Planning legislation.  
The most imminent of these reviews is the
preparation of North Ayrshire Local
Development Plan 3.  
We trust these suggestions will be taken into
account by national and local government in
their reviews. 
15
Source: Scottish Government             
www.ourplace.scot/about-place/place-principle

Page 22

16
WHAT WE’RE AIMING FOR
Chapter 3	 OUR VISION FOR THE FUTURE

Page 23

OUR VISION FOR THE FUTURE 
17
In 10 years’ time, the Garnock Valley will be a positive,
forward-looking, connected community of towns &
villages which:
• Has a thriving local economy.
• Has active, empowered communities.
• Enables residents to Live Well Locally, with key
daily needs easily accessible in each of our towns
without a car & for people with reduced mobility.
• Is a place of choice to live, invest and visit within
Ayrshire & the West of Scotland, particularly for
young people & families.
• Is at the forefront of tackling climate change and
supports residents to make climate-friendly
lifestyle choices.
• Has good links locally and to opportunities further
afield in Glasgow & other Ayrshire towns.
• Has strong identity & local pride.
Vision
3
Garnock Valley-wide calls to action
ACTION & DECISION MAKING  
Stronger community action and pride, more local
decision-making, more responsive public services 
TOWN CENTRES   
How they look and feel, & what they have to
offer: facilities, services and opportunities
GETTING ABOUT  
Public transport, walking and cycling  - within the
Garnock Valley & to other places, accessible to all
COMMUNITY LIFE  
Better community spaces, services, shops,
restaurants etc - accessible to all, with more
events & activities
PARKS & PUBLIC SPACE  
Managing, maintaining & enhancing our assets -
including Lochshore, Geilsland & Dalry park
HOMES  
Good quality, affordable, sustainable homes for
everybody - existing & new-build
YOUNG PEOPLE 
More opportunities for our young people: work,
play & participating in the future of their place
JOBS & BUSINESS  
Support local business & jobs, modern
manufacturing & the visitor economy
Our vision reflects aspirations expressed through
community engagement, and chimes with government
agendas.  
It builds on our many strengths and opportunities -
including our proximity to Glasgow city region & the
Ayrshire coast, our strong manufacturing heritage, our
lochs, hills & natural resources, and the commitment of
local organisations from all sectors (see pages 7 & 8).
To deliver that vision, this
Plan contains eight
Garnock Valley-wide “calls
to action”.  These are
summarised on the right
and explained in more
detail in chapters 4 to 11. 
Other projects are likely to
emerge during the 10 year
lifetime of the Plan; if they
contribute to the Plan’s
vision, they should be
supported.
The Plan also contains
proposals for each town &
village, showing how the
calls to action should land
on the ground in each
community.  Highlights are
summarised on the next
page, with detailed maps
for each town & village in
chapters 12 to 15.

Page 24

No embedded text on this page.

Page 25

19
CALLS TO ACTION
Chapter 4  ACTION & DECISION MAKING  
Stronger community action and pride, local decision-making,
responsive public services 
Chapter 5  TOWN CENTRES   
How they look and feel, and what they have to offer: more
homes and more facilities
Chapter 6  GETTING ABOUT  
Excellent public transport, walking and cycling  - within the
Garnock Valley and to other places, accessible to all
Chapter 7  COMMUNITY LIFE  
Top quality community spaces, services, shops, restaurants
etc - with more events and activities
Chapter 8  PARKS & OUTDOOR SPACE  
Managing, maintaining and enhancing our parks and the
outdoor spaces for health and wellbeing
Chapter 9  HOUSING & POPULATION  
Good quality, affordable, sustainable homes for everybody -
existing and new-build
Chapter 10  YOUNG PEOPLE 
More opportunities for our young people: work, play and
participating in the future of their place
Chapter 11  JOBS & BUSINESS  
Support local business and jobs, modern manufacturing and
the visitor economy

Page 26

ACTION & DECISION MAKING
Why we need action 
We want and need to put Community Wealth
Building and community empowerment into
practice (see page 14).  That’s because the old
ways of doing things haven’t shifted the dial
on the challenges described in chapter 1.  
Action needs to be community-led, working in
collaboration with authorities - bolstering
local identity, community pride and
empowerment, all of which are important to
us (see survey results on page 12).
What we want to achieve
We need to build capacity, collaboration and
leadership from the ground up.  
Decision-making and action needs to be
community-led and take place in a spirit of
genuine partnership and collaboration
between communities and local authorities.  
More specifically:
• We need to strengthen the ability of
community groups and small businesses to
act, grow and shape their local areas.  This
means fostering collaboration and shared
planning across sectors, laying the
groundwork for long-term community-led
regeneration.
• The community’s capacity to generate
income and disburse resources should be
built up so that we become more reliant on
our own assets such as renewable power
(see Appendix 9). 
• This Plan should guide decisions on public
service delivery and investment in the
Garnock Valley over the next 5-10 years.
• The public sector and community
organisations should work together to
deliver services, with resource allocation,
empowerment and shared decision-
making to match - putting Community
Wealth Building into practice.
On the ground, this would mean:
• Support for the Garnock Valley’s many
smaller community organisations to
deliver this Plan, such as Beith Cultural &
Heritage Society (the Townhouse), Dalry
She Shed & Garnock Valley Mens Shed.
• Bigger local community-led organisations
being encouraged & supported to take on a
bigger role in delivering this Plan &
supporting smaller organisations.
• Creating Community Development Trusts
or equivalents in each town with paid
capacity to deliver this Plan, similar to the
role that Beith Trust already has in Beith.
• Continued support for our three
Community Councils and other
representative groups like Barrmill
Community Association to champion and
deliver this Plan. 
What needs to happen
The rest of this chapter contains specific
actions to make these things happen.  
Specific priorities for each of our towns and
villages are identified in chapters 12-15.
Everybody will need to work together to
make these things happen (see chapter 16),
and we will need to secure support and
resources.  This Plan will help with that.
Appendix 9 contains findings on potential
models for a community-led delivery
organisation, work which was undertaken as
part of preparation of this Local Place Plan.
20
4
Quotes from
survey
responses
(see page 12)
More ways to engage people in
community & shape services
Prioritise funding through
community engagement
Please follow up plans with actions!
Recognising public sector funding/budget
challenges, work together to submit bids for
external funding (and build capacity in the
community to support this).
Create a
guaranteed income
stream, e.g.
community
ownership of
renewable energy
generation

Page 27

4.1 Garnock Valley Community & Business                           
Infrastructure Partnership
What is it?
Establish a structured, resourced programme to build
infrastructure for long-term, community-led change across
the Garnock Valley. The Partnership would support
community groups, social enterprise & small businesses,
recognising the challenges they face & the potential for
mutual support. It should be a strategic partner of North
Ayrshire Council & the Garnock Valley Locality Partnership.
What will it do?
Support smaller organisations:
• Mentoring, governance support, insurance hosting,
funding guidance, venue access
• Shared resources (e.g., communications, finance systems,
volunteer recruitment)
Develop delivery capacity:
• Staffed coordination team to support programme design,
monitoring and reporting
• Facilitate joint delivery of food, employability, well-being
and place-based programmes
• Deliver training for staff and volunteers across the sector
Explore and prototypes new structures:
• Test what a Garnock-wide community-led delivery
organisation could look like in practice (federated vs single
body) - see 4.8 on page 23
• Develop shared values, working agreements and strategic
planning tools
Who would be involved?  
Local community anchor organisations would lead, drawing
on their collective expertise, in partnership with other
existing and emerging community organisations across the
Garnock Valley. 
21
INSPIRATION FROM ELSEWHERE
Kyle of Sutherland Development Trust
Kyle of Sutherland Development Trust works across three Community Council
areas in mid Sutherland.  Since it was formed in 2011, the Trust has secured
over £10 million from investors and windfarm community benefit funds.  
With 16 staff (9.5 full time equivalents), it has delivered several large capital
investment projects and other activities.   Every four years, the Trust secures
core funding from community benefit funding for its staff team and operations.
Projects delivered in partnership with other local organisations include:
• A new business centre in
Ardgay, redeveloping a
derelict hotel and old barn
• Acquisition, refurbishment
and reopening of the
derelict Falls of Shin Visitor
Centre
• The Kyle of Sutherland Hub
- repurposing an old coal
yard by creating a purpose-
built community centre
with gym soft play area,
cafe and community
spaces.
• Acquisition and retention
of Bonar Bridge Post Office
and adjacent house,
retaining existing jobs. 
• Thirteen affordable homes,
in partnership with a local
Housing Association. 
For more detail, see this
independent evaluation
(chapter 4).

Page 28

4.2  Community Group Start-Up Support
Help new and emerging grassroots
organisations get going.
• Governance support, funding advice,
insurance cover, policy templates.
• Training for trustees, directors, committee
members and volunteers.
• Light-touch mentoring programme.
4.3  Micro & Start-Up Business Incubator
Support for small businesses, traders, and
social enterprises.
• Partnership with North Ayrshire Council’s
Business Gateway and Business Growth
Team.
• Training in marketing, finance, digital
presence.
• Affordable space-sharing models in vacant
units.
4.4  Shared Back Office Services
Help groups and businesses focus on delivery,
not admin.
• Pooled access to communications, finance
tools, HR templates, volunteer
recruitment.
• Coordinated volunteer bank for local
projects.
4.5  Training for Change Programme
Valley-wide training programme for staff,
volunteers, and business owners.
• Delivery in partnership with North
Ayrshire Council Community Learning &
Development and training providers.
• E.g: governance, safeguarding, digital,
finance, budgeting, first aid, customer
service, food hygiene etc
• Delivered locally, with low or no cost.
4.6  Community Delivery Pilot Fund
Funding and support for collaborative, local
community-led activity.
• Seed funding for co-designed programmes
(e.g. food, wellbeing, employability).
• Support with programme design, delivery,
and evaluation.
• Coordinated reporting to reduce admin
burden.
4.7  Local Collaborative Commissioning
Test new ways of commissioning services
through community partnerships using
Community Wealth Building principles.
• Co-design and delivery services with
North Ayrshire Council, the Locality
Partnership / Community Planning
Partnership, NHS etc.
• Build delivery capacity amongst local
charitable community-led organisations to
deliver services and invest in the local
community.
• Pilot joint funding arrangements and
shared impact reporting.
22

Page 29

4.8  ‘Garnock Valley Community  
Development Trust’ Model Exploration
Explore the creation of a Garnock Valley-
wide Community Development Trust or
equivalent.
• Test federated vs single-entity models.
• Host workshops, consultations, and study
visits.
• Develop shared values, governance, and
strategic planning tools.
23
INSPIRATION FROM ELSEWHERE
9CC Group, Cumnock & Doon Valley
• Nine Community Councils working
together to receive and disburse
community benefit payments from
local windfarms.
• Launched in 2023 with a single vision
covering all 9 Community Councils
across the Doon Valley.
• £100m over the lifetime of the
windfarms, spent in line with an overall
community-led plan.
• More information at 9ccg.co.uk.
INSPIRATION FROM ELSEWHERE
Point & Sandwick community windfarm
Point & Sandwick Community Trust in the
Western Isles has developed the UK's biggest
community-owned commercial-scale
windfarm - which now produces £900,000 a
year in net income for the local community.   
It has already enabled investment of £2m in
island projects.  Once capital costs have been
repaid, it will enable investment of that
amount every year. 
More information at www.hie.co.uk/
knowledge-library/case-studies/
pointandsandwick/

Page 30

TOWN CENTRES 
Why we need action 
Our town centres in Beith, Dalry and Kilbirnie
are the physical hearts of our communities:
the most accessible points in each town with
history, character, facilities and services.  
But they are in a sorry state with neglect,
dereliction, vacancy and poor choice of
shopping, entertainment and amenities. 
We need to up our game to boost investment,
growth, quality of life, health and wellbeing,
and community pride.
We want to bring new life to our town
centres so that they are the focus of
sustainable local communities, in line with the
Scottish Government’s ‘Town Centre First’
policy (see National Planning Framework 4,
Policy 27) and local living and 20 minute
neighbourhoods guidance.
What we want to achieve
Our vision is of our town centres being
smarter, tidier and thriving places, with more
people living in our town centres, public
services and small businesses.  
Priorities:
• Reduce the amount of vacant and derelict
property, particularly prominent buildings
and sites in each town centre (specific
buildings are identified in chapters 12-14).
• Increase business activity and investment,
particularly small businesses.
• Flexibility for more town centre living:
high quality flats and houses in central,
accessible locations.
• Focus public sector services and
investment to town centres, in line with
the Scottish Government’s Town Centre
First Principle.
• Improve the condition of streets, buildings
and spaces - their look and feel, to make
them more attractive to spend time in and
move around on foot.
What needs to happen
The rest of this chapter contains specific
actions to make these things happen.  They
focus on activating the built environment in
ways that benefit both residents and local
enterprise.  They rely on the skills,
confidence, and collaborative capacity
developed in the previous chapter to ensure
change is rooted in local needs and
community leadership.
Specific priorities for each of our towns and
villages are shown in chapters 12-15.
Everybody will need to work together to
make these things happen (see chapter 16),
and we will need to secure support and
resources.  This Plan will help with that.
24
5
Quotes from survey responses
(see page 12)
compulsory purchase orders on vacant
properties and either returned to community
ownership or developed as social housing
Create a pride in the area by removing empty
and derelict properties from the town centre.
Potential incomers cannot be impressed with
the current state of the towns.
Make the owners of the empty units
accountable for their upkeep. Offer incentives
to businesses to want to invest and set up
shop in the valley
Need shop fronts painted and tidied up. The
Garnock valley is very run down. Beith was a
lovely wee town when we moved here

Page 31

5.1  Town Centre Spring Clean Festival 
Community-led improvement of public spaces and streetscapes.
• Volunteer-led clean-ups in Beith, Dalry, Kilbirnie and Glengarnock.
• Activities include litter picks, planters, signage refresh, painting,
pressure-washing / soft washing buildings.
• Involve schools, men's sheds, gardening groups.
5.2  Shopfront Boost Grants
Small grants for facelifts of shopfronts and public-facing buildings.
• Grants available to active and vacant properties, like the £1.5m CARS
repair scheme in Millport town centre.
• Focus on conservation, good design, and aesthetic uplift.
• Deliver jointly with NAC & Historic Environment Scotland’s Heritage
and Place Programme.
5.3  Vacant to Vibrant Property Reuse Scheme
Turning empty or unloved buildings into community and business assets.
• Live register of vacant buildings with ownership/contact details.
• Support reuse with feasibility studies and small capital grants.
• High level condition reviews of buildings in Conservation Areas.
• Focus on key sites including Walker Hall, Anderson Hotel/Merchants
Yarn, St Margaret's Church, Geilsland House & Estate.
• Explore varying business rates to encourage property reuse.
5.4  Landmark Sites Programme
Strategic focus on key underused or symbolic buildings.
• Bring together partners to create reuse plans.
• Apply for larger capital grants (RCGF, THI, etc.).
• Host public visioning events to co-design future uses.
• Phased approach of feasibility studies leading to capital projects. 
5.5  "Love Garnock Towns" Communications Campaign
A shared identity and PR campaign for all towns.
• Develop brand identity (e.g. "Love Beith", "Love Dalry").
• Launch dedicated website, social media, and print materials.
• Share positive stories, promote projects, and build engagement. 
25
INSPIRATION FROM ELSEWHERE
Vibrant Gala
Galashiels has a population of around 12,000.  A former industrial town,
it shares some challenges with the Garnock Valley - including a town
centre with high levels of vacancy and neglect.  Energise Galashiels Trust,
a community organisation, was established in 2014 to tackle the
situation by creating a more vibrant and welcoming community.  
Since 2020, its energies have focussed on the Vibrant Gala Project, with
support from South of Scotland Enterprise and Scottish Borders Council. 
Individual initiatives have included:
• Marketing Galashiels: Heartland of the Borders with digital support
to enterprises including branding, website and social media.  The
website lists over 125 businesses and attracts 1,500 visitors a month.
• Improvement of 35 town centre properties with grants totalling
£120,000, focussing on long term vacant properties and new &
expanding businesses.
• Galashiels Heartland Awards for local businesses and organisations,
with a popular public vote.
• Tapestry Way
Feasibility
Study and
associated
development
activity to
maximise the
positive
impact of the
Great
Tapestry of
Scotland.
For more
information, visit
this webpage.

Page 32

5.6  Community-Led Cultural & Regeneration Programme
• Gala-style festivals as a route to increased footfall, civic pride and
business income.
• Promote and support cultural re-use of buildings (inspired by
CentreStage, Kilmarnock; see right) — especially key town centre
buildings like Beith Town House and Anderson Hotel, St Margarets
Dalry and the Library opposite, and the Walker Hall in Kilbirnie as
multi use spaces hosting enterprise, hospitality, performance,
learning and/or creative activity.
5.7  Destination Towns
Develop complementary brands/identities for each town based on
authentic local culture and heritage, for residents and visitors, and
working with educational institutions, local businesses and creative
organisations.  The branding/identities could reflect the Garnock
Valley’s agricultural heritage (e.g. local produce and farmers’ markets),
and the industrial, manufacturing, crafts and Rabbie Burns heritage of
the towns:
• Beith: furniture, cabinet making.
• Dalry: weaving, mining, ironworks, brickmaking.
• Kilbirnie and Glengarnock: steelworks, rope making.
This should include creative workshops, mural trails, exhibitions &
markets to showcase local talent, encourage participation & attract
visitors. 
26
INSPIRATION FROM ELSEWHERE
CentreStage, Kilmarnock
Since it opened its doors in 2006, CentreStage has been bringing
people of all ages and backgrounds together through arts activities:
classes, musical theatre, dance, acting, singing, Get Happy community
activities and much more. 
1,200 people get involved in activities every week, bringing joy and
happiness to individual lives - and helping people to fulfil their
potential, improving wellbeing and tackling poverty in the process.  
The team is also out and about in prisons, in care homes and in harder
to reach areas. And it is not just the performance arts that are learned
and honed at CentreStage. Prop-making, lighting, stage management,
reception, hospitality outreach and catering - the list is endless.
As well as supporting people across Kilmarnock and Ayrshire,
CentreStage also plays a big role in the town’s regeneration as a place.  
The former Kilmarnock Academy - a prominent 1.8 hectare vacant site
on the edge of the town centre - has been repurposed into a
multimillion pound ‘neighbourhood’ with a new state-of-the-art
theatre that won Scotland’s Best Theatre 2022.  
The site as a whole is home not only to CentreStage but to other social
enterprises - quite something for two teachers Fiona McKenzie
and Paul Matheson who left the security of their profession in pursuit
of a dream 20 years ago.
INSPIRATION FROM ELSEWHERE
West Kilbride Craft Town
The Craft Town Initiative was born in 1998 to use local arts and crafts
to tackle the 50% vacancy rate in the town centre’s shops.  
Nine empty premises were purchased and turned into studios.  The
Barony Centre opened in 2012 with exhibitions, classes and a cafe. 
New businesses have followed, including shops and a bistro.   
Find out more in the Scottish Town Toolkit, which also tells the stories
of Wigtown Book Town and Kirkcudbrightshire Artists’ Town.

Page 33

GETTING ABOUT
Why we need action 
Transport emerged as the top priority in our
community survey (see page 12 above). 
Better transport will increase access to jobs
and key services like hospitals, help tackle
social isolation, increase footfall in our town
centres, tackle inequality and help each of us
make sustainable transport choices - as the
recent Travel Needs Analysis shows. 
Buses are a lifeline for many of us, but they
don’t provide the services we need - an issue
across Strathclyde.  Beith is particularly
poorly served: the town has no rail link and
the last bus back from Glasgow is at 5:15pm.  
Although we have good trains to Glasgow and
Irvine, our railway stations are not centrally
located and are poorly integrated with buses.  
We want to be able to walk and cycle safely -
for our own health and wellbeing, so we can
move around more cheaply, and so we can do
our bit for climate change.  But pavements are
often in poor condition.  Key links are missing,
such as between Dalry and the rest of the
Garnock Valley, and across the A737 Beith
bypass to the villages.  And over two-thirds of
the National Cycle Network through the
Garnock Valley is on roads with no
segregated provision for cyclists.  
What we want to achieve
Map 34 overleaf shows the network of
connections we are aiming for within and
beyond the Garnock Valley.
Making that happen will mean that:
• People can use public transport to get to
work, study, healthcare and recreation
opportunities in the Garnock Valley and
further afield in Glasgow, Irvine,
Kilmarnock and the Three Towns.
• People can walk and cycle safely within
and between our towns and villages -
including to access daily needs such as
shops, schools and public services.
• We can tackle climate change, inequality,
health & wellbeing and community wealth-
building through less car use. 
What needs to happen
We have already made a good start: the
community-led Garnock Valley Travel Needs
Analysis provides an evidence base about the
improvements and actions needed.
The rest of this chapter contains specific
actions to make these things happen. 
Specific priorities for each of our towns and
villages are identified in chapters 12-15.
Everybody will need to work together to
make these things happen (see chapter 16),
and we will need to secure support and
resources.  This Plan will help with that.
27
6
Quotes from survey responses
(see page 12)
Bus services slowly being removed,
reverse decline. Trains ok but too dear
and don’t run with buses.
More frequent local
bus service that integrates
with rail timetable. Bus
service to and from
Glasgow in the evening
5 mins in the car and over an hour to get a bus to the next town,
with no safe way to walk. No use! The pavement between Beith and
Glengarnock is brilliant. We need more ways to get about.

Page 34

No embedded text on this page.

Page 35

6.1  Community Bus
• Frequent local services linking towns, villages, rail stations, Garnock
Campus, Lochshore and Geilsland.
• Smaller vehicles with disabled access.
• Plenty of similar examples to learn from across Scotland.
• Develop with SPT and the Community Transport Association.
• More details: Garnock Valley Travel Needs Analysis (page 79).
6.2  Bus Improvements
• Timetable updates for existing services, particularly bus/rail
connections at Glengarnock station and access to big employers.
• Additional bus subsidies to provide better routing and timetabling,
e.g. alter bus 337 to Crosshouse Hospital to serve Kilbirnie and Dalry
as well as Beith.
• More details: Garnock Valley Travel Needs Analysis (pages 79-80).
6.3  Real-time Bus Information
• Live bus tracking app.
• More details: Garnock Valley Travel Needs Analysis (page 80).
6.4  Garnock Valley Zonecard
• Investigate Garnock Valley Zone so passengers to travel on bus/rail
services run by different operators under the one ticket.
• More details: Garnock Valley Travel Needs Analysis (page 80).
6.5  Beith North Railway Station
• Reinstate former railway station at bottom of Kings Road, with
walking and cycling connections (see chapter 12, Map 4a).
6.6  A737 Beith Bypass Upgrade
• Implement A737 Beith bypass improvements promoted by Transport
Scotland, including safe pedestrian crossings and junction safety.
• Will improve walking/cycling safety between Beith, Geilsland/Spiers,
Gateside and Barrmill.
• An urgent priority which has been shovel-ready for many years. 
Consider phasing to accelerate its implementation.  
• See also chapter 12, Map 4a.
29
INSPIRATION FROM ELSEWHERE
South Ayrshire             
Community Transport
• Bigger community initiative
covering a larger area
• Multiple modes of transport:
scheduled buses, minibus hire,
excursions, ebikes
• More information at
www.sacommunitytransport.org
• Uses public subsidies previously
directed to commercial operators 
• Another example is Annandale
Community Transport in
Lockerbie, established 1999
INSPIRATION FROM
ELSEWHERE
Black Isle Wee Bus
• Community-led electric
minibus based in Culbokie
on the Black Isle.
• Daytime & evening bookable
service locally & and to
supermarket etc in Dingwall.
• Uses public sector subsidies
previously directed to
commercial operators. 
• Now being expanded to
cover the whole of the Black
Isle as proposed in the Black
Isle Local Place Plan.
• More information here.

Page 36

6.7  Dalry Connections
• Link Dalry with Kilbirnie and Kilwinning with traffic-free cycling/
walking route as shorter rerouting of hilly on-road section of National
Cycle Route 7 (see chapter 12, Maps 5a and 6a).
• Dalry-Saltcoats: reinstate proposals for pedestrian & cyclist provision
in proposals for B714 upgrade.
6.8  Lochshore Connections
• Reopen Ladeside Park footbridge to give access from Kilbirnie.
• Better walking and cycling links to/from Kilbirnie, Glengarnock and
Beith, including signage.
6.9  Towns & Villages Road Safety Programme
• Village and town centres: reduce vehicle speeds and                         
improve pedestrian safety (see chapter 15, Maps 8 and 9).
• Safe walking/cycling routes between Beith and Barrmill/Gateside
(see chapters 12 and 15).
6.10  Parking
• Lack of public parking is a challenge in residential areas, town centres
and railways stations across the Garnock Valley.  It impacts on
emergency & public services and is made worse by poor public
transport.  
• A comprehensive analysis of parking management, public transport
and active travel is needed in each town.
6.11  Cycle Storage
• Secure cycle storage at rail stations, key bus stops, town/village
centres, schools and other hubs like Garnock Campus, Lochshore and
community centres.
6.12  A737 Contingency Plan
• Put in place contingency arrangements for when A737 is closed for
accidents or repairs, to ensure traffic and economic activity still flows.
30
INSPIRATION FROM ELSEWHERE
Broadford & Strath path network, Skye
• Network of paths built up project by
project by Broadford & Strath Community
Development Company since 2000
• Provide safe walking routes off roads for
locals and visitors
• Includes heritage trails involving
restoration of historic pier & links to other
historic sites 
• Latest phase is safe cycle route from Skye
Bridge to Broadford, itself part of larger
Isle of Skye Cycle Network project
• More information at
www.broadfordandstrath.org
INSPIRATION FROM ELSEWHERE
Roadside walking/cycling routes, Islay
• Loch Indaal Way: 2 mile route linking Port Charlotte &
Bruichladdich
• Three Distilleries Way: 3 mile route linking Port Ellen & Ardbeg
• Example for proposed Dalry-Kilbirnie National Cycle Route
realignment; similar to Beith-Glengarnock roadside path

Page 37

COMMUNITY LIFE
Why we need action 
Sense of community is important to us in the
Garnock Valley.  We are proud of our identity
and heritage.
To keep our communities alive and thriving,
we need local services, facilities and
amenities in our towns and villages:
• Indoor and outdoor spaces where we can
meet and do things such as cinema nights,
youth cafes and farmers’ markets.  
• Groups and organisations where we can
do things together and look after each
other, whether we have lived here a long
time or have recently moved here.
• Events and activities to bring us together
and tackle social isolation.  
And we need to make sure that young people
and families opportunities and reasons to
stay here - because they are the future of our
communities.
)
What we want to achieve
• A network of community hubs giving
affordable and good quality space for
community activities in each of our towns
and larger villages.
• More events and activities - things to join
in, watch and participate, including family-
friendly, sports, exercise, music,
performance, crafts, history, learning,
indoor and outdoor, culturally sensitive…
anything that brings people together!
• Retain & enhance local services, facilities
and amenities in each of our towns, in line
with the Scottish Government’s Local
Living / 20 Minute Neighbourhood
guidance.  This should include health &
social care, toilets, libraries, parks,
recreation & community safety. 
• More choice of shops, cafes, restaurants,
accommodation & other services.
• Ultimately, a more active community with
better health and wellbeing outcomes,
more social inclusion and greater
community pride.
What needs to happen
The rest of this chapter contains specific
actions to make these things happen. 
Specific priorities for each of our towns and
villages are identified in chapters 12-15.
This should be read in conjunction with the
actions elsewhere in this Plan which will
support community life, particularly:
• Community action (chapter 4)
• Town centres (chapter 5)
• Parks and public spaces (chapter 8)
• Young people (chapter 10)
Further actions will need to be developed to
deliver the intended changes over the 5-10
year lifetime of the Plan.  
Support and resources will be needed, and we
know it will be challenging to deliver
everything.  Equally, cherry-picking one or
two actions and hoping to achieve success
will not be enough.  A combination of actions
will be needed to deliver positive change, and
others will emerge beyond those listed
overleaf.
Chapter 16 contains more information on
how everyone involved needs to work
together to implement the Plan.
31
7
Quotes from survey responses
(see page 12)
More community activities at an
accessible price for families
Making the area look
better would go a long
way to improving
morale and
encouraging people to
have more pride in their
community
Local farmers
markets, night time events.
Places for teenagers to go,
maybe cafes opening for
kids

Page 38

7.1  Matching Community Activity to Community Spaces
We want to retain and enhance indoor community spaces in Beith, Dalry,
Kilbirnie, Barrmill, Burnhouse, Gateside and Glengarnock—and support
and encourage a range of affordable community activities and events in
each town and village (indoor and outdoor; daytime, evening and
weekend; for different age groups; sport and exercise, arts and crafts,
recreation, biodiversity and learning). 
The way that is done is really important: it must be community-led. 
Existing organisations and venues that are well-positioned to lead
community hub activities need to be supported.  For example:
• Beith: Beith Community Association and Beith Community
Development Trust, with its strong track record of engagement and
delivering projects such as Beith Astro and Geilsland, are well placed
to lead revitalisation of community spaces in Beith.
• Dalry: As an established central point for activity in Dalry, the
Community Development Hub could be further supported to
broaden its reach and impact.  The forthcoming closure of St
Margaret’s Church is an opportunity to consolidate existing spaces
and create a larger central contemporary community space, including
using key buildings around the square.
• Kilbirnie & Glengarnock: With the right support, local community
organisation(s) could co-ordinate and drive improvements in
community facilities and a joined-up programme of activity.
• Barrmill & Gateside: replacement of Community Association’s life-
expired Community Centre will enable it to continue as the
community hub for Barrmill and Burnhouse, potentially also enabling
redevelopment of adjacent prominent derelict land.
(See chapters 12-15 for site-specific information in towns and villages.)
Rather than focusing solely on buildings, it is the activity, energy and
purpose within a space that ultimately builds success—like Kilmarnock’s
CentreStage (see page 26).  By investing incrementally over time in the
people, ideas and programmes that bring places to life, we can allow
activity to lead the way—ultimately creating vibrant, well-used
community spaces that are responsive to local needs and which evolve
organically.  Using this approach, it is the activity and energy of people
that drive the development of place, not the other way around. 
32
INSPIRATION FROM ELSEWHERE
Inverclyde Shed
The Inverclyde Shed is an award-winning
100% volunteer-run grassroots organisation
with the aim of providing spaces for people
to come together, be involved, grow and
share their skills & experiences.  It operates
a workshop in Greenock and growing spaces
in Port Glasgow, Greenock & Gourock.
The Shed reduces social isolation &
loneliness through activities where people
can build genuine lasting friendships,
improve their physical & mental wellbeing,
and develop their capacity to share their
skills and knowledge with others in the
community.
Activities take place all day every day—
making, arts, crafts, sewing, carving, music,
creative writing, gardening, growing spaces,
bee keeping, hydroponics and much more.
The Shed is a registered Scottish Charitable
Incorporated Organisation. When people
join, they are joining a community of over
450 members who work together, take
shared responsibility, and have a say in what
they do.
“I was aware of the Shed, but I didn't realise the
enormous impact it makes for the residents in
this area. I became a member about 9 months
ago when I signed up for the creative writing
class and it's been a fantastic experience. … I'll
be a member for life now.” —Iris Potter
More details: www.inverclydeshed.co.uk

Page 39

7.2  Garnock Campus & Lochshore	
• This Valley-wide facility needs enhanced community access:
# Greater community role in management and programming.
# Bigger range of activities e.g. watersports at Lochshore, leisure
classes.
# Valley-wide public transport & walking/cycling access (see
chapter 6).
7.3  What’s On Garnock Valley	
• Digital diary of events and organisations.
• Start small by using social media.
• Could develop to include digital signage in town centres.
• Complement with contact list of community organisations and
volunteers.
7.4  Tour de Garnock 2027	
• Public ride event from Lochshore to showcase our scenery &
heritage with permanent route signage for the future.
• Link with the Tour de France 2027 Scottish start and build on
the success of  Dalry’s annual Skirt the Skeith road run.
7.5  Local Living
• Retain, provide & enhance key public services in each town,
including health centre, community centre, library, play areas
and green spaces, toilets, childcare and banking hub.
33
INSPIRATION FROM ELSEWHERE
Kilwinning Banking Hub
• Shared banking space on the high
street: counter service operated by
the Post Office with cash
transactions for all major banks
and building societies, access to
bank representatives
• For personal & business customers 
• Enables local access to cash
following closure of bank branches
• Funded by high street banks
through Cash Access UK not-for-
profit company 
• Kilwinning Banking Hub in former
Clydesdale Bank is a local example

Page 40

7.6  Beith Health and Wellbeing Centre	
• Replace existing sub-optimal health centre with new fit-for-
purpose hub; NHS Ayrshire & Arran is awaiting funding.
• Options appraisal needed to consider:
# Refurbishment of existing premises.
# New build on existing site.
# Relocation elsewhere in the town centre.
# Co-location with other services (e.g. community centre, library).
# Re-use existing premises for affordable housing or community
space.
7.7  Action on Mental Health	
• Develop programme to tackle mental health issues and
loneliness, including increased social prescribing and health
advocacy in local hubs. 
7.8  New Scots
• Supporting New Scots to make the Garnock Valley their home,
including access to facilities like swimming pool & gyms in line
with their cultural requirements.
7.9  Community digital infrastructure
• Explore public or community ownership of fibre broadband
networks, public wifi, cloud/data infrastructure, digital
services, AI infrastructure, smart grids etc as a strategic utility.
• The aim is to create a replicable model of energy transition
and economic empowerment.
34
INSPIRATION FROM ELSEWHERE
Renfrew Health & Social Care Centre
• Social Work, 3 GP Practices,
dental practice, NHS services
(physiotherapy, podiatry, speech
& language therapy, learning
disabilities services, District
Nurse & Health Visitor, audiology)
• Award-winning NHS/Council
project
• Catalyst for regeneration of
Renfrew
• An ideal model for Beith— with a
lead role for the local community
like community-owned medical
centre in Fort Augustus?

Page 41

PARKS & OUTDOOR SPACE
Why we need action 
Our parks and outdoor spaces, like our town
centres, are the heart of our communities. 
They are places to meet, recharge our
batteries, and enjoy the outdoors.  They also
have a vital role in making the Garnock Valley
a more attractive place to live by improving
our health, wellbeing, economy and pride. 
But, like our town centres, they need some
tender loving care.
Communities are often best placed to
improve parks and open spaces—as
witnessed by excellent community-led
initiatives in parks in Beith, Dalry, Barrmill,
Gateside and Glengarnock in recent years. 
But they do need support.
Similarly, our wider public realm of streets,
footways, verges and other public spaces
need positive action to tackle worn-out
surfaces, encroaching vegetation,
accumulated litter, damaged drains and so on. 
What we want to achieve
• Maintain and enhance our valued parks
and open spaces identified in chapters
12-15, developing a new community-led
model.  As explained in chapter 4, focus on
people first: better places will  follow.
• Ensure that Beith and Dalry meet Fields in
Trust standards for open space (see North
Ayrshire Open Space Audit 2022, section
5.2).
• Make more of the potential of Geilsland/
Spiers and Lochshore to foster closer
relationships between community,
heritage and nature - and to generate a
new level of recreational and economic
opportunities.
• Smarten up the wider public realm around
the Garnock Valley so that it contributes
positively to the community. 
What needs to happen
The rest of this chapter contains specific
actions to make these things happen. 
Specific priorities for each of our towns and
villages are identified in chapters 12-15.
Further actions will need to be developed to
deliver the intended changes over the 5-10
year lifetime of the Plan.  
Support and resources will be needed, and we
know it will be challenging to deliver
everything.  Equally, cherry-picking one or
two actions and hoping to achieve success
will not be enough.  A combination of actions
will be needed to deliver positive change, and
others will emerge beyond those listed
overleaf.
Chapter 16 contains more information on
how everyone involved needs to work
together to implement the Plan.
35
8
Quotes from survey
responses (see page 12)
Go back to basics and get on top of
keeping the towns well maintained,
somewhere people can be proud to live
and proud to walk through
Clear litter from main roads, thrown by drivers. Not the councils
fault but the litter is shocking across the Garnock valley. Better
education/ fines/ signs encouraging to take litter home.
Better play equipment and
lighting in parks

Page 42

8.1  Dalry Park
• Support selective community acquisition and management of the
public park by Dalry Community Sports Club.
• Extend the public park eastwards towards DSM, including new/
repaired footbridge (see chapter 13).
8.2  Geilsland, Spiers & Lochshore Living Heritage Project
• Reimagine Geilsland Estate / House, Spiers Old School Grounds and
Lochshore Park as a layered site combining heritage, learning,
education and nature-based activity (see chapters 11, 12 & 14).
• Lochshore: must be viewed as a strategic asset for the whole Garnock
Valley.  It must not displace activity from elsewhere in the Garnock
Valley, and existing activities must not be encouraged to move there
from elsewhere in the Valley.  Initiatives at Lochshore must be
implemented in that context, and must cascade benefits out across
the GV as a whole, as originally envisaged.
• Lochshore should be developed as a day-visitor attraction for
Ayrshire, Renfrewshire and Glasgow.  This should include developing
watersports facilities and activities on Kilbirnie Loch with Kilbirnie
Loch Management Group and others.
• These sites have a deep connection to cultural heritage, education
and landscape with great potential for recreation, access to nature,
green employability and training.
• Put in place appropriate signage, wayfinding and PR for people to
easily find Lochshore, Geilsland and Spiers.
8.3  Walking the Valley
• Connect all of these spaces—Spiers, Geilsland, Lochshore, Dalry Park
and more—through storytelling trails, Interpretive Art local guides,
and participatory mapping. Create a network of meaning, memory,
and movement across the Garnock Valley.
• Map/audit rights of way / Core Paths and keep them clear.
36
INSPIRATION FROM ELSEWHERE
Super Slow Way, Lancashire
• Started 2015, shaped by the
local community working
alongside artists
• Supports people with no arts
experience to weave the fabric
of a future cultural landscape along the Leeds & Liverpool Canal using
its rich assets of environment, heritage & community
• Free family friendly activities from canoeing & growing projects to
arts & music - more info at www.superslowway.org.uk
INSPIRATION FROM ELSEWHERE
The Leven Programme, Fife
• Series of connected projects along the River Leven in Fife, from Loch
Leven through Glenrothes to the coast at Leven and Methil 
• All linked to environment, heritage and people 
• Government, businesses & communities working together to deliver
environmental improvements in and around the river, and maximising
the social and economic opportunities the improvements bring
• The Garnock Valley offers an
opportunity to do something at
similar landscape scale but more
community-led 
• Started 2018, runs to 2030
• More information at
www.theleven.org

Page 43

8.4  Festival of Parks and Places
• Host a rolling programme of creative, low-cost events across Dalry
Park, Lochshore, Geilsland / Spiers, and rejuvenated Orr Park in Beith
and Kilbirnie Public Park—tying each event to a seasonal theme and
inviting community co-creation.
• Building on existing activities, organise a programme of community
activities in parks and greenspaces across the Garnock Valley.
8.5  Living Parks & Playable Places
• Bring together local gardeners, artists, families and schools to shape
pockets of activity in each public park—from grow spaces and story
poles to play trails and pop-up repair cafés. Start small and build up.
• Ensure that every community has well maintained and accessible play
parks, greenspace and path networks.  As well as spaces already
mentioned and those shown on the maps in chapters 12-15, priority
areas should include Dalry community garden, Lynn Falls at Dalry, 
Glengarnock, Beith Astro and Place Woodland, Kilbirnie.
8.6  Spring Clean Festival 
• Community-led improvement of public spaces and streetscapes—see
chapter 5 (proposal 5.1)
8.7  Nature Networks 
• Encourage linking up of habitats and greater access to natural
environments.
37
INSPIRATION FROM ELSEWHERE
Zetland Park, Grangemouth
• Community-driven, local authority-
enabled regeneration of the main
public park—led by community group
Friends of Zetland Park with support
from Falkirk Council, £1.2m National
Lottery Heritage Fund grant &
Sustrans
• Capital works included cycling pump
track,  tennis courts, community
orchard, path improvements,
performance space, wildlife pond in
the derelict boating pond, war
memorial and fountain renovations &
heritage-themed play park
• £130k activity programme includes
oral histories, annual science festival,
event days, flag design, sports,
photography, cycling/bike activities &
performing arts

Page 44

HOUSING & POPULATION
Why we need action 
We are a popular place to live, and rightly so.  
Demand for housing in the Garnock Valley is
on the rise.  That’s good: more households
and residents will help sustain and build our
communities and the facilities and services
described in this Plan.  
As we attract more people, we need to:
• Create homes that are affordable for local
people on lower incomes and those with
particular needs, like older people, young
families and disabled people.
• Make sure people have access to the
facilities they need like healthcare, parks
and transport.
• Improve our town centres by redeveloping 
vacant property there into new homes.
• Avoid building on assets which the local
community uses and values, like valued
green spaces.
We must also upgrade existing homes which
are energy inefficient or below tolerable
standard, particularly rented homes and
those on lower Council tax bands.
What we want to achieve
• Build new homes where they encourage
residents to use local facilities and be part
of communities—rather than drive
elsewhere for shopping, work and
recreation by developing away from town
centres next to the A737, for example.
• Use new housing to help deliver other
elements of this Plan, like community
facilities and infrastructure—and prevent
new development without appropriate
supporting infrastructure.
• Offer a mix of tenures and price points in
new housing developments, so that there
are opportunities for existing local
residents to rent or buy.
• More ‘town centre living’ with more
residents and activity in our town centres. 
• Ensure that existing homes are energy-
efficient and up to tolerable standard,
particularly for people on lower incomes.  
• Local residents, especially young people,
should enjoy training and job
opportunities from local development and
construction.
What needs to happen
The rest of this chapter contains specific
actions to make these things happen. 
Beyond a focus on reuse of vacant or derelict
property in town and village centres (priority
sites are identified on the maps in chapters
12-15) and sites already identified in the
Council’s Housing Land Supply 2023-24, we
have only suggested a few potential sites for
new homes.  They will need more technical
work on things like, for example, drainage,
ground conditions, biodiversity and
development viability.
Chapter 16 contains more information on
how everyone involved needs to work
together to implement the Plan.
38
9
Quotes from survey responses
(see page 12)
Vacant shops and
businesses turned into
homes.- support from
the planning
department for this to
happen
You cannot continue to build houses (which is good) without improving
infrastructure, access to GP’s, transport, dentists, schools, town centres,
housing, investment is needed in these areas
“Restore town
centres, keep
lovely facades but
internal new
homes - no need
to demolish,
recycle big time!
Warmer homes
and energy
futures.

Page 45

9.1  Key Sites Programme 
• Redevelop key town and village sites in chapters 12-15 for
affordable or specialist housing 
9.2  Town Centre Living
• In town & village centres, reuse vacant property and tackle
landmark sites (see 5.3 & 5.4)
9.3  Fuel Poverty Programme / Housing Retrofits
• Promote existing home energy initiatives & grants
• Upgrade homes on lower Council Tax bands (esp. if below
tolerable standard) to higher EPC ratings with grants / low-
interest loans & streamlined consenting
• Retrofit existing homes for people who are older, disabled or
in care to live more healthily, affordably and independently
9.4  Community Wealth Building in Construction
• Apply Community Wealth Building principles to benefit local
construction industry and create local training & employment
opportunities
9.5  Community-led Planning Gain
• Ensure that ‘planning gain’ funds linked to new development
give residents access to the community facilities that they
need and support delivery of this Plan, whilst complying with
statutory requirements
9.6 National Planning Policy
• Statements of Community Benefit (required by NPF4 Policy
16b for developments of >50 homes) should contribute to
delivery of this Plan (see Appendix 1, item 5)
• Implementation of NPF4 Policy 16e should require at least
25% of new housing developments to be affordable (see
Appendix 1, item 4)
9.7  Population retention & youth recovery strategy 
• To bring together & complement various initiatives in the Plan
around housing, education and careers 
39
INSPIRATION FROM ELSEWHERE
Chapelpark, Forfar
• Conversion of derelict school
building and site in town centre
into 29 social rented homes—
including new build
• Funded by the local authority and
Scottish Government 
• More detailed information in
www.towntoolkit.scot 
• Example for former Glengarnock
Primary School site and re-use of
town centre derelict buildings
INSPIRATION FROM ELSEWHERE
Hope CoHousing, Orkney
• A community interest company
started by local residents in St
Margarets Hope, Orkney 
• They want to stay in their community
but need adaptable, accessible homes 
• Six community-led homes for older
people are being developed
• The group formed in 2018,
construction due to start shortly
• Supported by a housing trust, Scottish
Government funding & local authority
helping to find land
• More information: hopecohousing.org
& in The Guardian

Page 46

YOUNG PEOPLE
Why we need action 
Our young people are the lifeblood of our
community.  We need to offer them more
opportunities to have a rewarding youth,
remove barriers to their participation in
community life, and ensure they want to stay
in the area when they leave education.
Over 10% of respondents to the community
survey (see page 12) suggested that we need
to do more for our young people.   
What we want to achieve
• Remove barriers to young people’s
participation in community life.
• Support young people to make more of
opportunities available to them locally.
• A dedicated youth space in each town
which young people can call their own and
where they can meet for free.
• A variety of sporting and non-sporting
activities and facilities for young people,
building on local skills and interests.
• Training and work opportunities for young
people leaving school, particularly for
those with fewer academic qualifications.
• Tackle the climate emergency, a particular
concern of young people.
What needs to happen
The actions below should evolve and be
delivered with young people, Garnock Valley
Youth Forum, the Council’s community
learning and development team, schools &
Ayrshire College:
10.1  Planning for Youth
• Deliver youth aspirations through every
element of this Plan, including:
# Getting about (chapter 6)
# Community life (chapter 7)
# Parks and public spaces (chapter 8)
# Jobs and business (chapter 11)
10.2  Youth Spaces
• A dedicated youth space in each town that
young people can call their own: good
quality, equipped and free to access.
• Implement as part of the Community Life
proposals in chapter 5.
• Create a Youth Shed for practical
application of STEM/creative skills such as
carpentry & photography—making things
and sharing skills between age groups. 
10.3  Activity Programmes
• Ensure that there is a good range of youth
activities, especially creative activities in
Dalry and Kilbirnie (e.g. music, arts).
10.4  Youth Forum
• Continue to support Garnock Valley Youth
Forum as a space outwith formal
education for young people to meet and
develop, create opportunities, and speak
on behalf of young people.
• Support equalities, inclusion and
neurodiversity, such as organising LGBT
drop-ins in schools. 
10.5  Partnership Working 
• Ensure good joined-up working &
resourcing across organisations working
with young people in the Garnock Valley,
including NAC education, community
learning and development, & schools.
10.6  Climate Action 
• Actions led by young people to tackle
climate change.  Ideas include an artistic
climate posters trail, wildflower meadow,
conservation groups and edible planters.
40
10
Quotes from survey responses (see page 12)
encourage
young people to
start businesses
to benefit the
local community
Provide more
opportunities for young
people, this needs to be
consistent as often
projects run for a just
short while
More free music &
sports for children to
access everything has
got really expensive for
kids & it shouldn’t be

Page 47

JOBS & BUSINESS
Why we need action 
Traditionally, the Garnock Valley has made
things: iron, steel, bricks, textiles and
furniture, as well as agriculture of course. 
Although manufacturing has suffered
setbacks, we still make things: from steel and
rope to pharmaceuticals, green energy and hi-
tech munitions. 
Our active business sector has willing
entrepreneurs keen to build the local
economy and support communities.  They
enjoy great locational advantages - close to
Glasgow Airport, the Central Belt and
strategic transport links, and much cheaper
land and premises than in Glasgow.  
Being on the doorstep of the Central Belt
with lochs, hills, heritage and good links, we
have potential for a bigger visitor economy.
To make the most of this potential, we need
more land and premises for growing
companies, a skilled and experienced staff
pool, better public transport, and over-
dependency on the A737. 
Our biggest asset is our 20,000 residents and
their potential - with the right support - to
create more jobs and businesses.  Realising
that promise would be putting community
wealth-building (see page 14) into action.
What we want to achieve
• More local enterprises.
• More firms moving to the Garnock Valley.
• Existing businesses expanding and
creating more jobs.
• Better connections between local business
and schools, to give more opportunities to
young people and help recruitment
• Easier for employees to get to work
without a car.
• More day visitors enjoying what the
Garnock Valley has to offer.
• Tap into the potential of the green
economy and digital innovation.
• Deliver the National Strategy For
Economic Transformation locally. 
What needs to happen
The rest of this chapter contains specific
actions to make these things happen. 
Specific priorities for each of our towns and
villages are identified in chapters 12-15.
Further actions will need to be developed to
deliver the intended changes over the 5-10
year lifetime of the Plan.  
Support and resources will be needed, and we
know it will be challenging to deliver
everything.  Equally, cherry-picking one or
two actions and hoping to achieve success
will not be enough.  A combination of actions
will be needed to deliver positive change, and
others will emerge beyond those listed
overleaf.
Chapter 16 contains more information on
how everyone involved needs to work
together to implement the Plan.
41
11
Quotes from survey responses (see page 12)
More free music and sports for children
to access everything has got really
expensive for kids and it shouldn’t be
Better engagement
with education. More
employment
opportunities. Outreach
from FE colleges/
higher education.
invest for the future of the GV. Much has been
spent to improve areas of Irvine, which is great, but
other areas of NA are also in desperate need of the
same level of investment and support for
regeneration
local initiatives
giving 6 months of
employment to gain
vital experience and
qualifications

Page 48

11.1  Local Business Support 
• Community-led support for private/social
enterprises (see chapter 4), including in
town centres (see chapter 5)
11.2  Enterprise Network
• Establish a Garnock Valley enterprise
network / forum, to champion local
businesses and co-ordinate community /
Corporate Social Responsibility activities
• Include manufacturing, green technology,
services and tourism
11.3  Enterprise Ladder
• Identify sites and premises to create a
ladder of accommodation, from small to
large, for private and social enterprises to
grow and locate in the Garnock Valley
• Lochshore Industrial Estate offers good
opportunities for sites and buildings of all
sizes (see Chapter 14)
11.4  Spiers/Lochshore Living Heritage
• Develop employment & training
opportunities for environment/nature
restoration/visitors, with the two sites
working in partnership (see  proposal 8.2)
11.5  Beith Crafts & Skills Centre
• Skills initiative based on Beith’s heritage of
woodwork and cabinet-making
• Could be located in former United
Presbyterian Church on Head Street,
relocating Scout Group to Geilsland or
elsewhere (see Chapter 12)
11.6  Garnock Valley First
• Garnock Valley First procurement initiative
in favour of local suppliers for all Garnock
Valley Locality Partnership partners
11.7  Garnock Valley Pitch Book
• Create Garnock Valley Pitch Book to
target and encourage business investment,
including hotel/hospitality 
11.8  Garnock Valley Transport Improvements
• Transport improvements to help staff get
to work without a car (see chapter 6)
• A737 contingency plan to keep     
economic activity flowing in case                 
of closure (see chapter 6)
11.9  Childcare
• Tackling barriers to childcare providers
across the Garnock Valley, essential to
support parents get work & earn money
11.10  Agriculture
• Recognise the importance of agriculture  
to the Garnock Valley and the challenges
that the farming community faces in terms
of economics, rurality and climate change
• Develop specific initiatives such as local
food procurement supporting Garnock
Valley farmers (as in East Ayrshire for
schools meals) and support for carers in
the agricultural sector.
42
INSPIRATION FROM ELSEWHERE
Kirkconnel & Kelloholm Local Place Plan
This 2023 community-led plan includes
employment initiatives for the community,
local businesses & the public sector, many
similar to our aspirations:
• Realise the training and employment
potential of green energy
• Develop a new skills, learning and
innovation centre
• Develop small workshop/industrial units
• Prepare Upper Nithsdale visitor strategy
More information in the Local Place Plan.
INSPIRATION FROM ELSEWHERE
“Kickstart”: MacTaggart Construction, Dalry
Dalry-based MacTaggart Construction, one
of Scotland’s biggest builders of social
housing, has supported over 100 young
people annually through employment,
education andtraining initiatives since 2018. 
In 2021, McTaggart began the UK
Government Kickstart Scheme to support
young people aged 16-24 to gain a 6-month
paid work placement.
In the first year, 47 young people progressed
to permanent employment or registered
apprenticeships; 11 to college or further
training; and 21 to paid jobs elsewhere using
the skills and training. 19 decided the
industry was not for them and were helped
with further support.
McTaggart’s model shows that the
construction can offer effective training and
development. More information on the
McTaggart website.

Page 49

43
TOWN & VILLAGE PRIORITIES
Chapter 12	 BEITH
Chapter 13	 DALRY
Chapter 14	 KILBIRNIE & GLENGARNOCK
Chapter 15	 BARRMILL, BURNHOUSE & GATESIDE
also refer to overall map in chapter 3

Page 50

BEITH 
Responses to the community survey (see
page 12) offer an insight into people’s
priorities for Beith.  The summary diagram on
the right summarises the responses received
about Beith.  There is a wealth of detail in the
comments themselves, which are transcribed
in Appendix 4.
Together with comments from the town
events and other work outlined in Chapter 1,
this gives a good basis to identify local
proposals to deliver the Plan’s priorities.
Maps 5a and 5b on the next page show local
priorities for Beith, with starting points for
action on the subsequent page.  The
proposals should be read in conjunction with
the Garnock Valley-wide proposals in
chapters 4 to 11, and pedestrian/cycling
connections across the A737 to Barrmill and
Gateside in chapters 8 and 15. 
44
12
Beith
The community survey asked what should be
done to tackle persistent challenges across the
Garnock Valley.  
280 people commented with specific suggestions
for Beith. This infographic summarises the
responses suggested by more than 1 person. 
A high-resolution version of this infographic and
transcriptions of all comments can be seen in
section 4 of  Appendix 4.

Page 51

45

Page 52

BEITH  Starting points Key partners
PRIORITIES FOR RENOVATION / REUSE
• Identify owners of individual sites, then approach to establish and encourage their redevelopment plans, particularly
for community facilities and town centre living
• Work collaboratively on development or marketing packages, including community acquisition and/or use of statutory
powers as appropriate (see chapter 5)
North Ayrshire Council
Landowners
Garnock Valley Locality Partnership 
N Ayrshire Community Planning partners
KEY COMMUNITY FACILITIES
• Health Centre: specify facility requirements for a replacement building, identify potential town centre sites, work up
development proposals for Health Centre and/or shared hub with other community/public services 
• Town House: consider community acquisition
• Library: protect from closure or co-locate with other uses and redevelop for town centre living
• Community Centre: put on sustainable financial footing; refurbish, or relocate & redevelop for town centre living
• Geilsland Estate/House and Spiers: continue to develop as community hub for social and economic activity
North Ayrshire Council
NHS Ayrshire and Arran
community bodies
Garnock Valley Locality Partnership 
N Ayrshire Community Planning partners
PARKS & GREENSPACES
• Parks and green spaces: secure funding for proposed improvements, including new parks / greenspaces shown on map community bodies, North Ayrshire Council
CULTURAL ASSETS: GEILSLAND CREATIVE ENTERPRISE & BEITHCRAFT
• Geilsland Creative Enterprise Hub: new purpose-built enterprise village at Geilsland Estate with rentable units for
businesses, makers, and social enterprises, to support a vibrant creative economy
• BeithCraft Initiative: reimagine Beith's rich woodworking heritage via a community-driven craft programme, providing.
training, workspace & retail opportunities, celebrating traditional skills, & using culture & heritage as economic drivers
• Retirement living at Geilsland Estate to support new enterprise units and renovation of Geilsland House
community bodies
North Ayrshire Council
OTHER ACTIONS
• Masterplan approach to future expansion of Beith.  400 homes are consented with a larger number likely to follow.  A
strategic approach to infrastructure & facilities is needed (including active travel, rail, bus, roads, drainage, greenspace).
• A737 Beith bypass upgrade: implement Transport Scotland scheme
• Bus improvements: pursue recommendations in Garnock Valley Travel Needs Analysis (see chapter 6 of this Plan)
• Walking and cycling: audit existing urban and rural routes, identify priority gaps, improvements & funding
• Extend Conservation Areas (see map);  review Tree Preservation Orders to ensure valuable urban trees are protected
• Protect green belt around Beith as shown on map
Transport Scotland
SPT
North Ayrshire Council
community bodies
Garnock Valley Locality Partnership 
N Ayrshire Community Planning partners
Paths for All
Sustrans
46

Page 53

DALRY
Responses to the community survey (see
page 12) offer an insight into people’s
priorities for Dalry.  The summary diagram on
the right summarises the responses received
about Dalry.  There is a wealth of detail in the
comments themselves, which are transcribed
in Appendix 4.
Together with comments from the town
events and other work outlined in Chapter 1,
this gives a good basis to identify local
proposals to deliver the Plan’s priorities.
Maps 6a and 6b on the next page show local
priorities for Dalry, with starting points for
action on the subsequent page.  The
proposals should be read in conjunction with
the Garnock Valley-wide proposals in 
chapters 4 to 11. 
47
13
Dalry
The community survey asked what should
be done to tackle persistent challenges
across the Garnock Valley.  
158 people commented with specific
suggestions for Dalry. This infographic
summarises the responses suggested by
more than 1 person. 
A high-resolution version of this
infographic and transcriptions of all
comments can be seen in section 4 of 
Appendix 4.

Page 54

No embedded text on this page.

Page 55

DALRY  Starting points Key partners
PRIORITIES FOR REUSE, RENOVATION OR REDEVELOPMENT
• Identify owners of individual sites, approach them to establish and encourage their redevelopment plans, particularly for
community use or town centre living
• Work collaboratively on development or marketing packages, including community acquisition and/or use of statutory
powers as appropriate
• The Cross: masterplan to understand ownership, and generate proposals that match potential uses to available buildings
• St Margaret’s Church and Hall: support community acquisition as a community space
• Former “Graze” at the Den: encourage reuse of this prominent site on the A737
North Ayrshire Council
Landowners
Community bodies
Garnock Valley Locality Partnership 
N Ayrshire Community Planning partners
KEY COMMUNITY FACILITIES
• Sports Hub (public park): enable Community Asset Transfer from North Ayrshire Council
• Library: protect from closure, increase its use as a local community hub
• Community Centre: invest in the building and put on a sustainable financial footing
local community
North Ayrshire Council
Garnock Valley Locality Partnership 
N Ayrshire Community Planning partners
PRIORITY GREENSPACES
• Public Park: support community-led improvements to the park, extension to east, and upgrade connecting footbridge 
• Lynn Holm: continue to upgrade as outdoor event venue
community bodies
landowners
North Ayrshire Council
OTHER ACTIONS
• Cyclepath links to Kilwinning and Kilbirnie (NCN7): progress collaboratively involving local community, Sustrans and
North Ayrshire Council
• Bus and cycle route to Saltcoats: reinstate as part of B714 upgrade proposals
• Path surfacing from River Garnock to Kilwinning Road: prepare specification and costs
community bodies
North Ayrshire Council
Scottish/UK Governments
Garnock Valley Locality Partnership 
N Ayrshire Community Planning partners
Paths for All
Sustrans
SPT
49

Page 56

KILBIRNIE & GLENGARNOCK 
Responses to the community survey (see page 12) offer
an insight into people’s priorities for Kilbirnie.  The
summary diagram on the right summarises the
responses received about Kilbirnie.  There is a wealth of
detail in the comments themselves, which are
transcribed in Appendix 4.
Together with comments from the town events and
other work outlined in Chapter 1, this gives a good basis
to identify local proposals to deliver the Plan’s priorities.
Maps 7a and 7b on the next page show local priorities
for Kilbirnie and Glengarnock, with starting points for
action on the subsequent page.  The proposals should be
read in conjunction with the Garnock Valley-wide
proposals in chapters 4 to 11. 
50
14
Glengarnock (left)    Kilbirnie (right)
The community survey asked what should
be done to tackle persistent challenges
across the Garnock Valley.  
Kilbirnie: 180 people made specific
suggestions, summarised on the right. 
Glengarnock: 23 people made specific
suggestions, summarised on the left.  
Each infographic summarises the responses
suggested by more than 1 person. 
A high-resolution version of this infographic
and transcriptions of all comments can be
seen in section 4 of  Appendix 4.

Page 57

No embedded text on this page.

Page 58

KILBIRNIE & GLENGARNOCK  Starting points Key partners
KEY COMMUNITY FACILITIES
• Library & Job Centre: protect from closure, increase use as a local community hub
• Bridgend Community Centre: retain as a Community Centre, put on sustainable financial footing
• Walker Hall: relocate gym to Community Campus, invest in building as a community hub
local community
North Ayrshire Council
Garnock Valley Locality Partnership 
N Ayrshire Community Planning partners
PRIORITY GREENSPACES
• Public Park: progress proposals in Project Kilbirnie (2017)
• Place Woodland: support community-led activity
• Lochshore: must be viewed as a strategic asset for the whole Garnock Valley.  Lochshore must not displace activity from
elsewhere in the Garnock Valley, and existing activities must not be encouraged to move there from elsewhere in the
Valley.  Initiatives at Lochshore must be implemented in that context, and must cascade benefits out across the GV as a
whole, as originally envisaged (see section 8.2).
• Valefield Park: repair and reopen bridge connecting Kilbirnie with NCN7, Industrial Estate and Lochshore
community bodies
landowners
North Ayrshire Council
Garnock Valley Locality Partnership 
N Ayrshire Community Planning partners
PRIORITIES FOR REUSE OR REDEVELOPMENT
• Identify owners of individual sites, approach them to establish and encourage their redevelopment plans, particularly for
community use or town centre living
• Work collaboratively on development or marketing packages, including community acquisition and/or use of statutory
powers as appropriate
• Former toilet at Bridge St roundabout:  community-led arts project
• Former Glengarnock Primary School site: tidy, temporary use as greenspace or for nature, agree long term future use 
• Lochshore Industrial Estate: develop strategy for ladder of industrial property (small < medium < large premises)
North Ayrshire Council
Landowners
Community bodies
Garnock Valley Locality Partnership 
N Ayrshire Community Planning partners
Scottish Enterprise
OTHER ACTIONS
• Bus improvements: implement recommendations in Garnock Valley Travel Needs Analysis 
• Cyclepath link to Dalry (NCN7): progress collaboratively involving local community, Sustrans and North Ayrshire Council
• Extend Lochshore path network to Beith: identify potential route and potential funding/delivery model 
• Riverside walkway improvements in town centre: prepare specification and costs
• Pedestrian friendly improvements at The Cross: design, specify and cost 
• Extend Clyde Muirshiel Regional Park to include Kilbirnie Loch
community bodies
North Ayrshire Council
Scottish/UK Governments
Garnock Valley Locality Partnership 
N Ayrshire Community Planning partners
Paths for All
Sustrans
SPT
52

Page 59

BARRMILL, GATESIDE & BURNHOUSE
Village events held in Barrmill/Burnhouse,
Gateside and Glengarnock provided insights
into the local priorities for people living there,
to supplement responses to the community
survey (see page 12).  Transcriptions and
summaries of all comments can be seen in
section 4 of Appendix 4.
The maps on this and the next page show
priorities for Barrmill, Burnhouse and
Gateside, with starting points for action on
the stage 55.  (Glengarnock priorities are
included on the Kilbirnie maps in Chapter 14.)
This section should be read in conjunction
with the Garnock Valley-wide proposals in 
chapters 4 to 11, and proposals for links
across the A737 to Beith in chapter 12.
53
15

Page 60

No embedded text on this page.

Page 61

BARRMILL, BURNHOUSE & GATESIDE  Starting points Key partners
BARRMILL
• Road/footway improvements: design, specify and cost
• Walking/cycling routes on old railway lines: design, specify and cost
• Refurbishment of Community Centre: Community Association and North Ayrshire Council continue to work together to
upgrade the buildings and outside space
• Adjacent derelict site: approach owners to encourage their redevelopment plans, work collaboratively on development
package, consider incorporating Community Centre to enable site access and construction of replacement building
local community
North Ayrshire Council
Garnock Valley Locality Partnership 
N Ayrshire Community Planning partners
Paths for All
Sustrans
BURNHOUSE
• Road safety: design, specify and cost improvements with community input North Ayrshire Council
Garnock Valley Locality Partnership
GATESIDE
• Retain school
• Upgrade park and playground: specify and cost improvements with community input
• Footway improvements: specify and cost
• Rural path network: specify and cost with community input
North Ayrshire Council
Landowners
Community bodies
Garnock Valley Locality Partnership 
N Ayrshire Community Planning partners
55

Page 62

56
MAKING IT HAPPEN
Chapter 16	 IMPLEMENTATION

Page 63

IMPLEMENTATION
This Plan is our community’s “to-do” list for
the next 5-10 years.  It’s ambitious.  Not
everything will be achieved—but everything
is possible.  Some things may seem
impossible to deliver now, but circumstances
may change and resources can appear.
Making it happen will take collaborative
effort across the public, private and
community sectors, with everyone working
together for common purpose.
As explained in chapter 1, this Plan is
different.  That means it will need to be
delivered differently too.  This final chapter
explains how.
Delivering national agendas locally
The Plan aims to link community aspirations
and national agendas - and deliver national
agendas locally.  As described in chapter 3,
those agendas include the Place Principle,
National Planning Framework 4 and
Community Wealth Building.
Delivering this Plan delivers those agendas. 
North Ayrshire Council and its Community
Planning Partners have been moving in this
direction for a number of years in their
pioneering work on Community Wealth
Building.   What we suggest is to deepen and
and extend that work, within North Ayrshire
and with national agencies such as the
Scottish Government and Transport Scotland.
Working together
Delivering this Plan cannot be achieved by
local community organisations and Third
Sector alone.  It will rely on:
• The public, private and third sectors
working together, collaboratively, for
common purpose.
• The local community sector being
strengthened and empowered to lead
delivery, as described in chapter 4.
For that reason, we invite North Ayrshire
Council and the Garnock Valley Locality
Partnership to endorse and support delivery
of the Plan.  In working out how to do that,
the basic aims should be to:
• Use the Plan as evidence in designing and
delivering their public services.
• Take every opportunity to support its
implementation. 
• Work with local community organisations
in a spirit of equal partnership.
Immediate actions by North Ayrshire Council
and the Garnock Valley Locality Partnership
could include:
• The Plan should be registered by the
Council as a Local Place Plan for planning
purposes: to steer planning policy, be a
material consideration in determining
planning applications, and to guide
planning activity.
• Garnock Valley Locality Partnership
should approve this Plan, commit to its
implementation, and report publicly every
quarter on how the Partnership has
supported the Plan’s implementation.
• This Plan should be endorsed by the
Council and the Locality Partnership to
guide budgeting, investment and
policymaking in the Garnock Valley over
the 5-10 year lifetime of the Plan.
• Each Council department and Community
Planning Partner should be encouraged
to explain how it aims to support delivery
of the Plan, and then monitor and report
progress regularly through the Locality
Partnership.  
Those suggested actions are entirely
focussed on taking Community Wealth
Building to the next level, and could in due
course be rolled out to other Localities in
57
16

Page 64

North Ayrshire, learning from the Garnock
Valley as a pilot. 
These suggested actions will need to be
considered by the Council and its partners. 
That will involve innovative thinking about
how public resources are used, but it does not
necessarily mean that more resources are
needed.   Members of the Local Place Plan
Working Group (see page 9) are happy to
support those discussions.
Capacity and resources
Capacity and resources will be needed by
everybody who will be involved in delivering
this Plan - public, private and Third sectors.  
The Plan is not simply asking for more
resources.  Instead, the starting points are:
• What can be achieved with what is
already available?  How can existing
budgets and resources be targeted to
deliver the priorities in this Plan?
• What additional resources can be
accessed?  For example from community
income generation, national governments
or other external funders.
Part of the purpose of this Plan is to help
answer those questions and secure whatever
resources are needed for delivering the Plan,
whether they are existing or new.
From the community’s perspective, we need
more capacity and resources to deliver this
Plan.  Work is already underway to create a
development officer post to support delivery
of the Plan.
The Community and Business Infrastructure
Partnership proposed in chapter 4 is also
vital.  Most of our community organisations
are staffed and run by volunteers, which is
not a sustainable model to deliver this Plan.
The public sector will also need resources to
help deliver the Plan.  We hope that the Plan
will help to secure those resources.
Roles and responsibilities
As explained on the previous page, many
different partners need to work together to
make this Plan a reality.  
The local community
• Community Councils are the voices of the
local community across the Garnock
Valley and have key roles liaising with the
local authority and other public bodies.
• Local community organisations, including
members of the Working Group who led
preparation of this Plan (see page 2) and
others, do great work on the ground to
bring people together and deliver projects,
services & activities.  The Plan should help
to guide future activities and secure
resources, so helping to deliver the Plan.
National and local government
Public agencies have a fundamental role in
supporting and delivering many elements of
the Plan, working together with the local
community and with each other - as noted in
the tables in chapters 4 to 15. 
Scottish and UK Governments have a vital
role.  They set policy and resource allocation
for every aspect of this Plan, including:
• Biodiversity and climate change
• Community empowerment
• Housing
• Infrastructure
• Planning
• Transport
It is critical that the Scottish and UK
Governments also use this Plan to influence
their spending and policymaking, and we
hope that North Ayrshire Council will take
every opportunity to seek their support in
implementing the Plan. 
North Ayrshire Council, the Garnock Valley
Locality Partnership and Community
Planning partners also have critical roles:
• Garnock Valley Locality Partnership's
stated role is to support the communities
of the Garnock Valley to help them
do what is needed to tackle the issues that
they have identified as priorities for their
local area - in other words, the content of
this report.  We hope that they and other
North Ayrshire Community Planning
partners will be proactive in delivering and
championing the Plan. 
• North Ayrshire Council has provided vital
support to get the Plan to this stage.  We
hope that support and collaborative way of
working will continue to strengthen as the
Plan is implemented - in relation to
services that the local authority itself
provides and also to champion the Plan
with others.
58

Page 65

Other organisations 
We will need help from many other
organisations to deliver specific elements of
the Plan.  They include:
• Ayrshire Chamber of Commerce
• Ayrshire College 
• Historic Environment Scotland
• Home Energy Scotland 
• Housing Associations
• KA Leisure
• Paths for All
• NHS Ayrshire and Arran
• NatureScot
• renewable energy developers & investors
• Skills Development Scotland
• Strathclyde Partnership for Transport
• North Ayrshire Council
• North Ayrshire Third Sector Interface
• property developers & investors
• Scottish Enterprise
• SEPA
• Scottish Futures Trust
• Scottish Water
• Sustrans
• Transport Scotland
• VisitScotland
We recognise that many of these
organisations, particularly those in the public
and third sectors, will themselves require
resources.  We hope that this Plan helps them
to secure those resources.
We hope that each of the organisations
referred to, plus national and local
government, use the Plan as part of their
evidence base when setting budgets and
reviewing policy.  The Plan is, essentially, a
comprehensive statement of community
aspirations which should be an invaluable
part of their decision-making.  The
community responses in the appendices to
the Plan are a rich source of information
about community aspirations.
We hope that businesses, landowners and
investors use the Plan to inform their
decision-making too.  Whether based locally
in the Garnock Valley or further afield, they
have vital roles in generating jobs, economic
activity and managing land and buildings. 
They will find the Plan a useful source of
information about community aspirations and
to think how they can help deliver the Plan.
Action planning
Every numbered action listed in chapters 4 to
11 should have a custodian to lead and
facilitate its delivery.  Identifying those
custodian for each action should be a priority
for the paid support and community-led
delivery body proposed in chapter 4, working
closely with key partners in the local
community, local authority and Locality
Partnership.
Monitoring & review
Life won’t stand still over the 5-10 year
lifetime of the Plan.  New aspirations and
challenges will appear, and adjustments will
be needed.
To guide how to respond to new challenges or
ideas, the Plan includes an overall vision in
chapter 3 and statements of “what we want
to achieve” for each call-to-action in chapters
4 to 11.  Basically, if a new proposal helps to
deliver the overall vision and one of those
statements, it should be supported.
At some point, the Plan will however will need
to be updated as circumstances change.  The
community-led delivery body proposed in
section 4 should be responsible for
facilitating the Plan’s review.  To guide that
process, we suggest:
• An annual report celebrating what has
been achieved over the previous 12
months in delivering the Plan, which could
usefully be accompanied by community
discussion and networking about the Plan
and its delivery.
• A review of the Plan after 5 years.
Planning policy
This Plan is intended to function as a Local
Place Plan and therefore contains
suggestions that the local community would
like to see supported in the next Local
Development Plan.
Those suggestions are summarised in
Appendix 1, to comply with the requirements 
of Section 14 of the Planning (Scotland) Act
2019 and in line with Scottish Government
Circular 1/2022
59

Page 66

APPENDICES
1	 Planning policy recommendations 
2	 Facts and figures about the Garnock Valley
3	 Audit of previous work
4	 Community survey results
5	 Town events
6	 Village events
7	 Schools workshops 
8	 Draft Plan consultation responses
9	 Potential models for community-led delivery organisation

Page 67

Appendix 1  Planning policy recommendations
Although this Plan is not solely focussed on
statutory land-use planning, it contains a
number of proposals that the local
community would like to see supported in the
next Local Development Plan or tackled
through Development Management.
This appendix summarises actions relating to
land-use planning and reasons for them, as
required by Section 14 of the Planning
(Scotland) Act 2019 & in line with Scottish
Government Circular 1/2022.
Please note that this Appendix only relates to
statutory land-use planning and is not a
complete list of all actions in the Plan.
PROPOSAL REASONS
1 Town Centres First: strengthen the range of policy and implementation actions
to revive our town centres, including the actions outlined in Chapters 5 and 9 and
the maps in Chapters 12-15
To facilitate Local Living and strengthen our town centres, which are
significant for the local community (see Planning Circular 1/2022,
paragraph 43).
2 Vacant and Derelict Property: strengthen policy and delivery actions to tackle
derelict land, including the actions outlined in Chapters 5 and 9 and the maps in
Chapters 12-15
To improve health and wellbeing, improve our environment, and
support sustainable development.
3 Local Living: protect and enhance the community facilities shown on the maps in
Chapters 12-15, and locate development sites so that they are within easy and
safe walking, cycling and/or public transport connectivity to town centres and
community facilities (see Chapters 9 and 12-15)
To facilitate Local Living, and identify locations which are significant
for the local community (see Planning Circular 1/2022, paragraph
43).
4 Affordable Housing Plus: 
• Require that 25% of new housing developments should be affordable in line
with NPF4 Policy 16e; but, if that target cannot be met, then the commuted
sum / financial contribution in lieu of affordable housing should be spent either
on providing affordable homes elsewhere in the Garnock Valley or on delivery
of this Local Place Plan.
• Enhance existing affordable housing policies by encouraging different tenure
types (e.g. shared equity and co-living), low-medium price points, and access
for local, younger, older & disabled people and young families (see Ch 9).
To support delivery of this Plan and sustainable, vibrant local
communities.

Page 68

5 Community Benefits: 
• Reinstate developer contributions policy
• Ensure that ‘planning gain’ funds related to new development give residents
access to the community facilities that they need and support delivery this
Plan, whilst complying with statutory requirements (see Chapter 9)
• Ensure that Statements of Community Benefit (required by NPF4 Policy 16b
for developments of >50 homes) should contribute to delivery of this Plan.
To support delivery of this Plan and sustainable, vibrant local
communities.
6 Beith Expansion Masterplan: take a masterplanned approach to the expansion of
Beith, to identify future housing sites & ensure that active travel links,
greenspace, drainage, public transport and other facilities / infrastructure are co-
ordinate & implemented with residential development (see Chapters 6 & 12)
To support delivery of this Plan and sustainable, vibrant local
communities.
7 Reinstate Beith North Railway Station: identify as a long term aspiration,
including active travel connections from the town to the site of the station, as
part of a masterplanned approach to expansion of Beith (see previous point and
Chapters 6 & 12)
To improve connectivity to Glasgow city region, Ayrshire coastal
towns and other locations.
8 Beith A737 Bypass Upgrade: identify this as a priority delivery project, based on
the land take proposed in Transport Scotland’s 2015 proposals (see Chapters 6
and 12)
To improve road safety and access to community facilities for Local
Living.
9 Conservation Areas and town centre Tree Preservation Orders: review Tree
Preservation Orders to protect key town centre trees, extend Beith
Conservation Area (see Chapter 12), enable building murals
To better protect the built and natural heritage of the town
10 Kilbirnie Cross Placemaking: identify as a location placemaking and pedestrian
safety enhancements (see Chapter 14)
To identify areas significant for the local community (see Planning
Circular 1/2022, paragraph 43), improve public safety, support the
local economy, Local Living and community sustainability.
11 Parks and Public Spaces: protect and enhance our town and village parks as
outlined in Chapters 8 and the maps in Chapters 12-15.  
To identify areas significant for the local community (see Planning
Circular 1/2022, paragraph 43) and support health & wellbeing,
biodiversity, Local Living etc.
12 Community Event Space at Lynn Holm, Dalry: identify as an outdoor community
event space (see Chapter 13)
To identify areas significant for the local community (see Planning
Circular 1/2022, paragraph 43), reflect the established use of the
site, and support health & wellbeing, Local Living etc.

Page 69

13 Enterprise Ladder: identify sites and premises to create a ladder of
accommodation, from small to large, for private and social enterprises to grow
and locate in the Garnock Valley (see Chapter 11)
To support the local economy, Local Living and community
sustainability.
14 The Place Principle and Community Wealth Building: encourage development
proposals to explicitly support implementation of the Place Principle and
Community Wealth Building (see Chapters 3 and 16)
To support delivery of this Plan and creation of sustainable, vibrant
local communities.
15 Vacant and Derelict Land: update the register of sites (at the time of writing, this
was last updated in 2022)
To ensure that sites are correctly designated when planning
applications are submitted, and enable access to funding

Page 70

Appendix 2  Facts and figures about the Garnock Valley
Reproductions of display boards presented at the town and village
events - online at www.ourgarnockvalley.net/s/GV-boards-
challenges.pdf

Page 71

Appendix 3  Audit of previous work
Audit of previous work over the last decade - online at
www.ourgarnockvalley.net/previous

Page 72

Appendix 4  Community survey results
Full report of the community survey and transcriptions of all comments
received - online at www.ourgarnockvalley.net/s/GVLPP-community-
survey-report-Nov-2024.pdf

Page 73

Appendix 5  Town events
Full report of the town events and transcriptions of all comments
received - online at www.ourgarnockvalley.net/s/GVLPP-Nov-2024-
town-events-report.pdf

Page 74

Appendix 6  Village events
Full report of the village events and transcriptions of all comments
received - online at www.ourgarnockvalley.net/s/GVLPP-Jan-2025-
village-events-report.pdf

Page 75

Appendix 7  Schools workshops
Report of the schools workshop held in February 2025 at Garnock
Campus - online at www.ourgarnockvalley.net/s/Our-Garnock-Valley_-
Schools-Workshop-Report_ISS_26th-March-2025.pdf

Page 76

Appendix 8  Draft Plan consultation responses
Report of the public consultation held on the draft Plan in June-July
2025, including transcriptions of all responses and explanations of how
they have influenced the final Plan.  Online at bit.ly/4m5b1xL

Page 77

Appendix 9  Potential models for community-led delivery organisation
Report produced by Community Enterprise during preparation of the
Local Place Plan to initiate discussion about potential models for that
organisation - online at bit.ly/3CT5F7E

Page 78

No embedded text on this page.

Page 79

Summary of Local Place Plan Proposals 
Local Place Plan: Garnock Valley
Submitted by: Beith & District Community Council, Beith Community Development Trust, Dalry Community Council, Dalry Community
Development Hub, Dalry Community Sports Club, Garnock Valley Youth Forum and Kilbirnie and Glengarnock Community Council. 
Submission Date: 26 September 2025
Registration Date: 
Proposals for the development and/or use of specific land and/or buildings: 
Ref Proposal Location  
Renovation/ Reuse or Redevelopment 
- Encourage redevelopment plans particularly for community
use or town centre living. 
Beith
Townhouse, Anderson Hotel, Merchants Yarn, Auld Kirk, Rajas,
Gap site opposite Eglinton Inn, 5 Townhead, Wilson St/ Mitchell St
corner, EU Church, Scout Hall, former respite centre by High
Church, telephone exchange at Kings Road. 
Beith Community Centre and Library (refurbish or relocate. If
relocated use site for town centre living). 
Beith Health Centre (replace/ upgrade) 
Potential future development site at King’s Road, Beith (item 14
page 45 of GV Local Place Plan) 
Dalry 
St. Margaret’s Church, St Margaret’s Church Hall, Kings Arms/
Kings Revolution, Public Halls St. Aitken St, derelict site by New
St carpark on Smith Street, derelict site by Dales of Dalry, derelict
site of Bridgend Mills, derelict site at Sharon St/ James St corner,
derelict site of Lomond Castings, Drakemire 
Former ‘Graze’ at the Den – encourage reuse of prominent site on
A737

Page 80

Ref Proposal Location
Kilbirnie & Glengarnock
Main Street - Gap site 2-4 Main Street, 52 Main St (former bank),
70 –72 Main Street, 86 Main Street (former Art Gallery)
51 –53 Main Street (former shops) and 93 Main Street (former
chip shop) 
Former toilet, Bridge Street (for heritage/ art) 
Stoneyholm Mill 
Unused factory space at W&J Know 
Former Presto site, Townhead 
Derelict site by Wat Memorial Arch, Holmhead 
Kilbirnie Auld Kirk 
Derelict former Glengarnock Primary School site 
Vacant Industrial sites at Lochshore Industrial Estate 
Barmill
Community Centre (renovate or replace) 
Retain & Enhance  Kilbirnie & Glengarnock
Library & Job Centre;
Health Centre;
Community Centres – Bridgend Centre, Walker Hall, Mens Shed
& George Steven Centre;
Garnock Campus (enhance community access & involvement,
reopen cafe) 
Barmill

Page 81

Ref Proposal Location
Barmill Park, Millbar Grove playpark and greenspace at end of
Millbar Grove, Community Centre 
Gateside
Retain school, upgrade playpark and playground 
Community Hub 
Continue to develop as Community Hub. Creative Enterprise Hub
with rentable units for businesses, makers and social enterprises. 
Retirement Living to support new enterprise units. 
St Margaret’s Church, Dalry; 
Beith Astro, 
Dalry Library, 
Kilbirnie and Glengarnock Library, 
Walker Hall (also relocate gym to Community Hub), 
Kilbirnie Job Centre 
Barmill (refurb) 
Geilsland House/ Speirs, Beith 
Derelict Site - Development Package. Consider incorporating
Community Centre 
Barmill  
Masterplan  Beith for future expansion in relation to housing;

Page 82

Ref Proposal Location
The Cross, Dalry 
Affordable/ Specialist Housing  Garnock Valley – no specified area/ location 
Community Garden at Mitchell Street. Potential for affordable
housing. 
Re-Instate Beith North Railway Station  Bottom of King’s Road, Beith 
Implement the A737 Beith Bypass Improvements  Beith 
Reopen Bridge – connect Kilbirnie with NCN7/ Lochshore  Ladeside footbridge & Valefield Park, Kilbirnie  
Pedestrian Safety 
Form pedestrian crossings and junction safety. Make more
pedestrian friendly. 
Priority across all Garnock Valley town and village centres (Page
30 - Action 6.9 of GV LPP). 
Beith 
Geilsland/ Speirs 
Gateside and Barrmill 
The Cross Roundabout, Kilbirnie 
Walking and Cycling

Page 83

Ref Proposal Location 
Beith - Audit existing urban and rural routes, identify gaps to
improve the route network around Beith and create a rural path
network to Barmill, Burnhouse and Gateside 
Extend Lochshore path network to Beith 
Old railway line, Barmill 
B706 MoD junction to Barmill (no footway/ verges, blind bends)
A737 crossing 
Roundabout safer crossing at Barmill 
Create walking/ cycling on disused railways – off road link
between Park & Millbar Grove 
Link to Beith, Kilwinning and Barrhead from Barrmill 
Dalry Re-Route NCR7 
Bus and cycle route Dalry to Saltcoats – reinstate as part B714
upgrade proposals 
Cyclepath Links to Kilwinning and Kilbirnie (NC7) and Kilbirnie/
Glengarnock to Dalry (NCN7). 
Riverside walkway improvements in town centre – Kilbirnie 
Rural path network – Barmill, Burnhouse and Gateside 
Riverside Walkway Improvements  Kilbirnie Town Centre  
A736 pedestrian/ cycle crossing, delivery/ visitor parking, signage,
lower traffic speeds, rural path network 
Burnhouse, Gateside

Page 84

Ref Proposal Location    
Nature Conservation Area  Glebe Road, Beith - undeveloped boggy ground where Planning
Permissions have lapsed, land appears undevelopable. 
Former Glengarnock primary School 
Park/ Greenspaces Improvements/ Upgrades  Dalry
Public Park – upgrade lighting, extend to the North
Lynn Holm – enhance as outdoor event space 
Glengarnock Park 
Gateside 
Kilbirnie
Kilbirnie public park upgrade 
Orr’s Trust Park
Lochshore
Astro/ Bellsdale (drainage)
Community Garden at Community Centre 
Extend Clyde Muirshiel Regional Park to include Kilbirnie Loch  Kilbirnie Loch  
Outdoor Event Venue  Lynn Holm, Dalry  
Community Led Arts Project  Former toilet at Bridge St, Kilbirnie 
Water Sport Facilites  Lochshore