Democracy Spraffa

2400588PPM - Hunterston Construction Yard Fairlie North Ayrshire

North Ayrshire Council · 23 April 2025
Back to Planning Committee — 23 April 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

NORTH AYRSHIRE COUNCIL 
23rd April 2025                                                                                                                                                            
Planning Committee 
Locality  North Coast and Cumbraes
Reference 24/00588/PPM
Application Registered 27th August 2024
Decision Due 27th December 2024
Ward North Coast 
Recommendation  Approved subject to Conditions 
__________________________________________________________________ 
Location  Hunterston Construction Yard Fairlie North Ayrshire  
Applicant  Bakkafrost Scotland 
Proposal  Creation of a RAS (Recirculated Aquaculture System)
Complex to include all buildings, access roads,
parking, landscaping and other required infrastructure.
___________________________________________________________________ 
1. Description 
Permission is sought for the creation of a Recirculated Aquaculture System (RAS) complex.
This is essentially a complex for the breeding of salmon smolts. 
The proposed site is in the north-east corner of the Hunterston Construction Yard. The total
application site is approx. 6.75ha in area, including an existing access road from the south
and a route between the main part of the site and a jetty to the north-west. The actual
complex itself would be within a roughly rectangular area, some 3.3ha, in the north-west
corner. 
A section of the site to the south is marked a potential future development area but no
specific plans are proposed as part of this application. A separate application (ref:
25/00130/PP) has been submitted to grade that land for future use in association with the
rest of the Construction Yard. 
The RAS complex would be enclosed by a steel weldmesh security fence between 2m and
3m in height. Within the complex would be buildings for the various stages of fish
development. These would be some 12090sqm in footprint, in total, and would be between

Page 2

approx. 10.8m and 12.4m in height. There would be an administrative and education centre
building some 480sqm in footprint and 12.4m in height at the highest point. There would be
various stores and silos for the water, oxygen and other materials required for the process.
These would be between 6m and 7m in height. 
The site would have an internal road, parking and a SUDs retention basin for surface water.
The northern and eastern edges of the site have an extant permission (ref: 23/00606/PP)
'Site preparation works, establishment of compound area and initial groundworks including
landscaping and other required infrastructure.' This application proposes those same
permitted works with the exception of the compound. 
The whole Construction Yard has a lawful use for general industrial purposes (ref:
22/00717/LUE). 
The application falls within the category of "national" development, in terms of The Town
and Country Planning (Hierarchy of Developments) (Scotland) Regulations 2009 and
National Planning Framework (NPF) 4. A pre-application consultation (PAC) was required.
A PAC notice was received 11th September 2023 (ref: 23/00698/PREAPM). 
The proposal was screened in accordance with the Town and Country Planning
(Environmental Impact Assessment) (Scotland) Regulations 2017 on 2nd June 2023 (ref:
23/00330/EIA). 
No EIA was considered to be required. However, the following environmental information
was identified as being necessary and has been submitted as part of the application. 
Preliminary Ecological Appraisal and Baseline Wildlife Surveys 
Identifies that the site itself has negligible conservation value as a man-made site with an
industrial use. Proposals to minimise disturbance to breeding and non-breeding birds are
proposed as are habitat enhancement measures. Approx. 1.7ha of the site is to be retained
as green spaces, including seawall bunds, amenity areas and permeable grassland type
parking areas. An Outline Habitat Management Plan to include coastal grassland, scrub,
wetland, a shorebird roost site, artificial nest sites for birds and measures to deal with
invasive plant species has been included. 
Landscape Visual Appraisal 
This assesses the likely visual impact of the development from various viewpoints including
landscape designations, landmarks and routeways. The appraisal determines that the
impact would likely be moderate to negligible in most views. There would be a moderate
impact on users of the coastal path which passes the site. However, this would be in the
context of the wider industrial area and only for a limited part of the path. 
Noise Impact Assessment 
This assesses the likely noise impact of the development on the basis of 24-hour, 7-day
operation. It concludes that the noise from the operation of the development would be
neutral or slight. 
Archaeological/Heritage Assessment

Page 3

This is a desk-based study of the likely archaeological impacts. It concludes that the site is
made of approx. 5-7m of dumped stone rubble. Therefore, it is considered there is a
negligible chance of any archaeological deposits being disturbed. The proposal may have a
minor adverse impact on the setting of Hunterston House (Category B Listed Building)
although this is some 1.1km distant. 
Ground Investigation Report 
This considers the ground conditions of the site. It sets out the further information that any
developer should consider in terms of engineering of the site and identifies potential
remedial requirements. 
Transport Assessment 
This considers the impacts of the proposal on the local highway network, on and off-site
parking, non-vehicle users and road safety. The document concludes that the proposal is
acceptable in transport terms and would have a negligible impact on transportation. 
Energy Statement 
This sets out the energy efficiency of the proposal. It is considered the proposal would meet
the Scottish Building Standards energy efficiency requirements. Solar PV is identified as a
renewable energy option for the site which could contribute to a 10% increase in energy
efficiency. There would also be electric vehicle charging points within the site. 
Flood Risk Assessment (FRA) 
This sets out the suggested ground level and finished floor levels for the site, when
considered in terms of likely flood risk and climate change. 
The application has also been accompanied by: 
Pre-Application Consultation (PAC) Report, a Planning Statement and an Economic
Report 
The PAC report outlines the public consultation undertaken prior to submission of the
application. Public exhibitions were held in Fairlie, West Kilbride and Millport. 85 people
attended these three events. There was also an online exhibition with 24 views. The public
were generally positive about the proposal particularly in terms of innovation and
employment. Concerns were raised in terms of noise and other environmental impacts, and
it was hoped the relevant information would be submitted as part of the planning application
process. 
The Planning Statement sets out the proposal in the planning context. The Economic
Report sets out the projected economic impact of the development over a 30-year life
period. It considers the construction process could generate 264 FTE jobs whilst the
operation of the development could generate 15 FTE direct jobs and 35 FTE jobs in the
supply chain in North Ayrshire.

Page 4

The site is within the Hunterston Strategic Development Area and a Business and Industry
Employment Location, as identified within the Adopted 2019 North Ayrshire Council Local
Development Plan ("the LDP"). NPF4 identifies Hunterston as a Strategic Asset. The
relevant polices are Strategic Policy 1: The Coastal Objecting, Strategic Policy 2, Strategic
Policy 3, Policy 7, Policy 15, Policy 16, Policy 24 and Policy 31 of the LDP and Policy 1,
Policy 4, Policy 10, Policy 14 and Policy 22 of NPF4. 
The Council approved a development framework for Hunterston PARC, which includes the
construction yard. The development framework is a material consideration for this
application. 
2. Consultations and Representations 
The application was advertised in the local newspaper. One objection was received. 
1. The development will lead to a net loss of development. The site is a large area of open
mosaic habitat on previously developed land, a habitat which is a conservation priority.
Habitats which developed on former industrial land are recognised by ecologists to have an
extremely high conservation value. The ecological value of the site is considered to be very
high due to the proximity to the sea. The proposed replacement works do not compensate
for this loss. 
Response: The application site is not former industrial land. The Construction Yard has a
lawful use for industry (ref: 22/00717/LUE). The landowners have sought to move away
from the permitted marine construction/decommissioning use to other forms of industry.
Permission has been granted to infill the rest of the site and create a new quay wall (ref:
24/00444/PPM.) Permission has also been granted for the reprofiling of the north-eastern
corner of the site (ref: 23/00606/PP.) However, the site has not been abandoned and the
application requires to be considered in the context of the lawful industrial use. The
biodiversity impacts are considered further below. 
2. The information submitted on ecology is considered to be deficient. 
Response: The submitted information is considered to be acceptable for the purposes of
determining the application. Some of the surveys submitted have not been published on the
website as they relate to protected species. NatureScot has been consulted on the proposal
and their response is set out below. NatureScot has been given copies of all the submitted
surveys. 
The following consultation responses were received. 
NAC Active Travel and Transportation (Roads) - No objections. Construction vehicles for
the route should be prohibited from the C26 and local unclassified roads, the B780/B781
and A78 through Fairlie. 
Response: Noted. A Construction Environment Management Plan (CEMP) could be
required by condition. 
NAC Environmental Health - No objections. The rated noise level, as defined in BS4142,
from the operation of the facility must not exceed the background noise level at any existing
or consented noise sensitive property.

Page 5

Response: Noted. Such a condition could be attached to any permission, if granted. 
SEPA - No objection. No flood risk concerns. They consider water compatible
developments of this type to be a relatively low risk. The flood risk to the site is solely of a
coastal nature meaning any loss of flood plain capacity is unlikely to significantly increase
risk elsewhere. Ther is access/egress to higher ground and mitigation through land raising,
without the need for compensatory storage, is acceptable. This is because of vast coastline
and any changes to an area of this size could not cause notable displacement. Support the
minimum finished floor levels of 6.25mAOD. 
Response: Noted. 
NAC Flooding - Initially sought further information related to FFLs. The applicant
responded in respect of FFLs to confirm that they would be 6.4mAOD, 0.15m higher than
the recommended, and 6.0mAOD for ground level, as per the recommendation in the Flood
Risk Assessment. Given this, NAC Flooding are content with respect to levels and
recommends flood resistant construction methods be incorporated into the design. An
evacuation plan to allow the use to be recoverable in the event of a flood should be
prepared. The access route for safe egress in event of flood should be above 5.445mAOD. 
NAC Flooding also initially sought details of potential coastal erosion. The applicant
responded to confirm that they consider the proposal accords with Policy 10 of NPF4. The
landowner is responsible for maintaining the rock armour in a functional state in order to
render the site fit for leasing purposes. NAC Flooding consider maintenance should be
controlled by planning condition. 
Response: It is noted that the FFLs would be above the recommended level, the level of
which has also agreed by SEPA. SEPA are the statutory consultation body in respect to
such matters. The ground level would be 6mAOD which is the recommended level. An
evacuation plan would be a matter for the operator of the site. Details of flood resistant
construction methods could be included in any CEMP. Planning conditions are required to
meet certain tests including being reasonable, enforceable and relevant to planning. A
requirement for ongoing maintenance of the rock armour is not considered to meet those
tests. This would be a private legal matter for which the landowner is ultimately responsible. 
Marine Scotland - No objections. Give advice to the applicant on the information they
would need to provide to get authorisation from Marine Scotland under their licensing
regime. 
Response: Noted. 
Scottish Water - No objections. Give advice to the applicant on the next steps in respect of
a water connection. 
Response: Noted. 
NatureScot (NS) - Initially sought further information relating to pumped seawater. The
applicant provided confirmation that pumped seawater is only to be used to remove excess
heat from the water temperature control system. There would be no crossover of seawater

Page 6

with freshwater. Given this NS are content that there is likely no significant effect on the
Endrick Water SAC and an appropriate assessment is not required. 
The proposal, as shown on the submitted plans, would have no direct impact on the extent
or condition of the SSSI. Any indirect effects from possible works outside the scope of the
planning application would be considered, if required, through a Marine License application.
Further advice is given on marine development and usage, which falls outwith the scope of
this application. 
NS initially also sought further information relating to potential flooding and rock armour
maintenance. The applicant has provided the information and NS noted SEPAs position
with respect to flooding. Based on the information on rock armour maintenance and
provision of flood resilient infrastructure to prevent the release of pollutants the overall
integrity of the SSSI will not be compromised. 
NS welcome the mitigation measures proposed in the Drainage Strategy and also the
proposed mitigation measures relating to water management issues. They provide advice in
relation to potential impacts on Priority Marine Features (PMFs) potential piling noise. NS
recommend that a Habitat Management Plan including the information in the submitted
planning statement and including NS's guidance be prepared. 
Response: The likely no significant effect on the SAC and no direct impact on the SSSI is
noted. 
The works planned in the marine environment do not form part of this planning application
and fall under Marine Scotland's license regime. The applicant has confirmed that concerns
in relation to PMFs, piling and other marine issues will be addressed in the Marine License
application process. 
Fairlie Community Council (FCC) - Neither supports nor objects. Any development in
Hunterston Parc area will impact on the views of the area and will likely detract from the
amenity of the village. Note the likely benefits to animal health in the initial stages of the
fishes' lives. However, concerned thar this development could bring applications for open
pen fish farms in the area. Also concerned over the regulations relating to the movement of
smolts and the operation of vessels in the Clyde. Would like more information on the feed
which will be fed to the fish, and any facility should be monitored and regularly inspected.
FCC would wish for Bakkafrost, or any other user, to become part of the Hunterston Parc
Liaison Committee. 
Response: Noted. The site has a lawful industrial use and is within an industrial allocation as
identified in the development plan. The application is for a RAS complex only, any other
development would have to be considered on its merits should it be proposed. The
movement of vessels and works in the marine environment are not within the scope of
planning and are not material to this application. This is also the case for feed and
inspections. The applicant has expressed their willingness to join the Liaison Committee, as
appropriate, with the landowner (Peel Ports) already a member. 
Office of Nuclear Regulation (ONR) - They are assured that the proposed development
can be accommodated into off-site emergency plans with respect to the Hunterston Power
Stations. Therefore, does no advise against the development.

Page 7

Response: Noted 
3. Analysis 
Strategic Policy 1: The Coastal Objective of the LDP states that in principle support will be
given to a range of development proposals including those that assist to develop and
strengthen the coastal economy and provide jobs to communities. 
Strategic Policy 3: Hunterston Strategic Development of the LDP area states that proposals
for certain industrial uses will be supported at Hunterston Deep Water Port including
renewable generation, manufacture, maintenance and testing; maritime decommissioning
and construction; bulk handling facilities; and other storage, processing and distribution and
light industry facilities which would not undermine the strategic importance and unique asset
of Hunterston as a deep-water port. 
Policy 7: Business and Industry of the LDP states that support will be given in principle to
business and industry uses in identified locations, including Hunterston. 
NPF4 identifies Hunterston, including the Construction Yard, as a Strategic Asset. It states
that the repurposing of Hunterston will be supported. NPF4 identifies certain development
proposals which are to be classified as 'national' in terms of the hierarchy of development.
Such national developments are considered to support the redevelopment and reuse of the
existing strategic asset. Such development supports the national spatial strategy. One of
the developments identified as 'national' is 'Land and buildings for industrial, commercial,
research and development, and training uses.' 
On 1st December 2021, the Planning Committee agreed to approve a development
framework for Hunterston PARC, which includes the construction yard. The development
framework identifies this location as suitable for development. It identifies the site as a
marine yard with scope for industrial development. 
It is considered that the proposed RAS complex is an appropriate industrial use. The land
has a lawful use for general industry. The proposal would support the repurposing of the
Hunterston Construction Yard. The applicant has provided information to suggest the
economic benefits to the local economy through construction and operation. As such the
proposal accords with the principles of Strategic Policy 1, Strategic Policy 3 and Policy 7 of
the LDP and Hunterston Strategic Asset, as identified in NP4, and the development
framework for Hunterston PARC. 
Policy 24: Alignment with Marine Planning of the LDP identifies the application site as part of
the developed coast. Proposals in such areas are acceptable in principle where they align
with marine planning. The Clyde Regional Marine Plan has not been subject to statutory
consultation to date and it is therefore not considered appropriate to be a material
consideration for this proposal. 
Policy 10: Coastal Development of NPF4 states that development proposals in developed
coastal areas will be supported where they do not give rise to further coastal protection
measures being required and it is anticipated to be supportable in the long term.

Page 8

The proposal is for development of an existing industrial yard. SEPA has been consulted
and had no objections including on flooding grounds. It is not expected that further coastal
protection measures would be required. The maintenance of such existing measures would
be a matter for the landowner. It is noted that that the application forms a small part of the
larger Construction Yard for which the landowner has permission to carry out works. As
such the proposal is considered to accord with Policy 24 of the LDP and Policy 10 of NPF4. 
Strategic Policy 2: Placemaking of the LDP sets out the six qualities of a successful place.
The relevant qualities in respect of this development are considered to be 'distinctive,'
'resource efficient,' and 'safe and pleasant.'  Policy 14 of NPF4 is essentially a reiteration of
the six qualities, with the relevant qualities being 'distinctive,' 'sustainable,' and 'pleasant.' 
Policy 15: Landscape and Seascape of the LDP states that, where appropriate,
development should take into consideration its individual and cumulative impacts on
landscape features. 
The physical works proposed comprise a complex of building enclosed by a steel weldmesh
security fence between 2m and 3m in height. The buildings would be for the various stages
of fish development. These would be some 12090sqm in footprint, in total, and would be
between approx. 10.8m and 12.4m in height. There would be an administrative and
education centre building some 480sqm in footprint and 12.4m in height at the highest point.
There would be various stores and silos for the water, oxygen and other materials required
for the process. These would be between 6m and 7m in height. 
The buildings and stores would be industrial in appearance as may be expected for such a
location. The administrative and education centre building, which would be at the northern
end of the complex and therefore closest to views from the sea, would be clad and have
fenestration to provide interest when viewed from distance. This building would also have
an outdoor terrace at second floor level, some 7.5m above ground, which would provide
views from the building to the north and west. The development would only be viewable
from public viewpoints from long distances, including over 1km from the nearest listed
building, and would only be viewable in the context of the industrial landscape of
Hunterston. 
NAC Environmental Health was consulted and have no objection. They state the rated noise
level, as defined in BS4142, from the operation of the facility must not exceed the
background noise level at any existing of consented noise sensitive property. Given that
Hunterston is a strategic development area where other development is consented, and
further proposals expected it is considered such a condition would be appropriate for any
permission. 
NAC Active Travel and Transportation was consulted and has no objections. They advise
that construction vehicles should be prohibited from the C26 and local unclassified roads,
the B780/B781 and A78 through Fairlie. A Construction Environment Management Plan
(CEMP) could be required by condition which could include prohibition of construction
routes. 
Given all the above, the proposal is considered to have no significant impact on landscape
features. The proposal therefore accords with Policy 15 of the LDP. Subject to conditions
relating to construction traffic and noise, and given the distance to any sensitive properties,
it is not considered the proposal gives rise to any significant amenity impacts.

Page 9

Policy 1 of NPF4 states that when considering all development proposals, significant weight
will be given to the global climate and nature crises. 
Policy 16: Protection of Designated Sites of the LDP states that support will be given to
development which would not have an unacceptable adverse effect on designated sites
including nature conservation sites of national significance including SSSIs. Policy 4 of
NPF4, has similar requirements to Policy 16 of the LDP. It states that development which
would affect a SSSI will only be supported where the objectives of the designation and
overall integrity will not be compromised of where any adverse effects are outweighed by
benefits of national importance. 
The development site is adjacent to a SSSI. The applicant has confirmed that seawater from
the Clyde would only be used to remove excess heat from temperature control. Seawater
would not be used in the fish breeding process. NatureScot has confirmed they are content
with this. They do not consider there would be any impact on the SSSI or the Endrick Water
SAC - the Special Area of Conservation is a salmon breeding ground on the eastern side of
Loch Lomond linked to the Clyde. 
The site is a man-made structure with a lawful industrial use. Proposals to minimise
disturbance to breeding and non-breeding birds are proposed as are habitat enhancement
measures. An Outline Habitat Management Plan has been submitted along with
landscaping proposals. This includes wildflower seeding, including a coastal mix, shrubbery
and soft landscaping. The exterior bund would be profiled to provide a roosting area for
birds. A Habitat Management Plan based on that submitted could be required by condition
as could the carrying out of the landscaping. An Ecological Clerk of Works could also be
required to oversee the construction of the development.   
Given this, the proposal it is considered that the proposal accords with Policy 16 of the LDP
and Policy 1 and Policy 4 of NPF4. 
Policy 22 of NPF4 states that development proposals in a flood risk area will only be
supported in certain circumstances including if they are water compatible uses or essential
infrastructures where the location is required for operational reasons. 
The applicant has submitted a Flood Risk Assessment which has been considered by
SEPA. SEPA confirm that they have no flood risk concerns. This is a water compatible
development and there would be no loss of flood plain capacity elsewhere. The FFLs for the
buildings would be above the recommended floor level height and the ground would be over
0.5m higher than recommended. Therefore, there should be safe access and egress in the
event of a predicted flood. 
NAC Flooding expressed concerns about the ongoing maintenance of the rock armour
surrounding the site. However, the existing rock armour does not form part of this
application, and its maintenance would be a matter for the landowner. Details of flood
resistant construction methods could be included in any CEMP 
The proposal is a water compatible use with a location required for operational reasons i.e.
the transport of bred salmon smolts to fish farms on the west coast of Scotland. The
proposal is therefore considered to accord with Policy 22 of NPF4.

Page 10

Policy 31: Future Proofing for Heat Network of the LDP requires all major applications to be
assessed in terms of potential to create a district heat network. 
The proposal would be a for a factory complex on the former construction yard. Whilst the
yard has a lawful industrial use and there is permission to infill, there are no other permitted
schemes to develop the yard, nor are there any existing buildings of facilities. Should other
developments arise it may be possible to create a district heat network. However, it is not
considered feasible at this stage. The proposal accords with Policy 31 of the LDP. 
The proposal is considered to accord with the relevant policies, including the relevant
qualities of a successful place as set out in Strategic Policy 2 of the LDP and Policy 14 of
NPF4, of the development pan. There are no other material considerations to the contrary
and permission can be granted subject to conditions. 
4. Full Recommendation 
Approved subject to Conditions 
Condition 
1. Prior to the commencement of the development, a Construction Environment
Management Plan (CEMP) shall be provided to North Ayrshire Council, as Planning
Authority, for written approval. The CEMP shall include details of flood resilient construction
methods and preclude the use of the C26 and local unclassified roads, the B780/B781 and
A78 through Fairlie as a route for construction vehicles. Thereafter all works are to be
carried out in accordance with any CEMP as may be approved, to the satisfaction of the
Council, as Planning Authority. 
Reason 
To ensure an appropriate construction management plan and to minimise impacts on
the area. 
Condition 
2. Prior to commencement of the development an independent ecological clerk of
works (ECoW) shall be appointed. The contact details, credentials and terms of reference
shall be submitted to the Council, as Planning Authority, for approval. For the avoidance of
doubt, the ECoW will audit the CEMP, and the construction practices contained therein. The
ECoW will have the authority to halt any works not in accordance with the CEMP and report
such incidences to the Council, as Planning Authority. 
Reason 
To ensure proper oversight during the construction process 
Condition 
3. Prior to the commencement of the development, a Habitat Management Plan (HMP)
shall be submitted to North Ayrshire Council, as Planning Authority, for written approval.
The HMP will take cognisance of the outline management plan set out in the Preliminary
Ecological Appraisal dated July 2024, by Atlantic Ecology, and submitted as part of this

Page 11

application, and provide details of the steps to be taken through construction and operation
of the site for the management and enhancement of habitats. 
Reason 
To ensure the proper management of habitats in the interests of the biodiversity of
the site 
Condition 
4. Prior to the commencement of the development, details of landscaping shall be
submitted to North Ayrshire Council, as Planning Authority, for written approval. The details
shall be based on draft drawings LO1 Rev C and LO2 Rev C, submitted as part of this
application, and will include details of all soft landscaping including grasscrete or similar
paving areas and maintenance details. Any details as may be approved shall be carried out
prior to the occupation of the complex or in the first planting season following completion of
the buildings, whichever is soonest. Any landscaping which dies, becomes diseased, is
removed or otherwise fails within 5 years of planting shall be reinstated in the first available
planting season. 
Reason 
To ensure appropriate landscaping of the site in the interest of biodiversity and visual
amenity of the area. 
Condition 
5. That the rated noise level, as defined in BS 4142:2014+A1:2019, from the operation
of the development, as defined by the approved location plan, shall not exceed the
background noise level at the curtilage of any noise sensitive premises existing or
consented as of the date of the permission. 
Reason 
To ensure appropriate noise levels in the interests of amenity. 
Allan Finlayson 
Chief Planning Officer           
For further information please contact Mr Iain Davies  on 01294 324320.